Peak Period Reversible Traffic Lanes
Parliament of Singapore · 8 April 2013
Official Report, 8 April 2013, Vol 90, Issue 17 · Open in the reader (summaries, search, filters)
21
Mr Alex Yam asked the Minister for Transport with the announcement of reversible traffic lanes for peak periods on the KJE, which stretches will be considered for the scheme.
Mr Lui Tuck Yew: LTA has engaged a consultant to study stretches of the KJE and PIE (near Jurong) that are suitable for reversible flow lanes. The study is still ongoing.