Future Plans for Park Connector Networks

Parliament of Singapore Β· 3 October 2022

Official Report, 3 October 2022, Vol 95, Issue 69 Β· Open in the reader (summaries, search, filters)

44

Mr Christopher de Souza asked the Minister for National Development (a) what are the future plans for our park connector networks (PCNs); and (b) whether the PCNs can increase in number and length so as to provide more options to residents to exercise near green spaces or along water bodies like canals.

Mr Desmond Lee: Our park connectors are located near to green spaces, along water bodies and provide recreational opportunities for Singaporeans to exercise and explore outdoor spaces. Some examples include the Changi Bay Park Connector and Alexandra Park Connector. Over the years, we have been expanding our park connector network. To date, there are about 370 kilometres (km) of park connectors islandwide, and the National Parks Board (NParks) aims to increase the length of park connectors to 500 km by 2030.

We are also establishing a 360-km island-wide network of recreational routes across Singapore, comprising park connectors and trails. For example, the first phase of the Round Island Route was opened in January 2022, providing a 75-km recreational connection along the Eastern coastline, from Rower's Bay to Berlayer Creek. When completed, these island-wide recreational routes will provide more opportunities for Singaporeans to walk and cycle in natural spaces for longer distances.

Besides providing opportunities for nature-based recreation, our park connectors and island-wide routes also help to enhance ecological connectivity between natural habitats, strengthening Singapore's ecological resilience as we transform into a City in Nature. Together, these efforts contribute to our goal of enabling all households to be within a 10-minute walk from a park by 2030.

Source: Singapore Parliament Official Report (Hansard) for 3 October 2022. Republished on SGParliament.