Improving Existing Poor-quality Cycling Paths

Parliament of Singapore · 26 September 2025

Official Report, 26 September 2025, Vol 96, Issue 6 · Open in the reader (summaries, search, filters)

71

Mr Patrick Tay Teck Guan asked the Acting Minister for Transport whether the Ministry has any plans to review and improve existing poor-quality cycling paths that are disjointed, blocked or too narrow, to enhance the safety and viability of cycling, especially in respect of cycling paths that run parallel to footpaths.

Mr Jeffrey Siow: As a starting point, the Land Transport Authority (LTA) always aims to build cycling paths that are connected, wide and segregated. However, this is not always possible for various reasons. Some gaps in connectivity are temporary, because LTA is building cycling paths in stages and many gaps will be closed over time.

There are also cycling paths built in the Housing and Development Board (HDB) towns that do not meet the current guidelines today, as they carry the old typology. These are grey cycling paths, and some are narrower than the current standard, red-coated cycling paths that are 2 metres wide. LTA has progressively upgraded these grey cycling paths and are continuing to work on the upgrades. In other cases, the paths are narrower than ideal due to the lack of space, such as where we need to avoid mature trees.

Where paths cannot be widened further, LTA works with relevant agencies to implement safety measures, such as installing convex mirrors at locations with line-of-sight issues, speed regulating strips and trimming of overgrown hedges that narrow the paths. For cycling paths beside pedestrian-only paths, path marking and signs are used to guide users to stay on their respective paths.

Source: Singapore Parliament Official Report (Hansard) for 26 September 2025. Republished on SGParliament.