Evaluating Feasibility of Bus Rapid Transit System in Tuas South
Parliament of Singapore · 9 September 2026
Official Report, 9 September 2026, Vol 96, Issue 36 · Open in the reader (summaries, search, filters)
Mr Chua Kheng Wee Louis asked the Minister for Transport regarding the feasibility study for a Bus Rapid Transit (BRT) system at Tuas South (a) what are the criteria and timeline used to evaluate the BRT's feasibility; (b) whether similar medium-capacity systems, such as trams, have been considered; and (c) what is the intended passenger capacity of conventional and tram-like BRT systems being studied.
Mr Jeffrey Siow: The viability of a Bus Rapid Transit (BRT) system for Tuas South will be determined based on projected public transport ridership, land and infrastructure requirements of the system, and its impact on existing traffic. As part of the feasibility study, we will look at different vehicle types to determine the optimal system design.
We are considering BRT systems because they are potentially more economical, flexible and faster to implement than rail or tram systems, which require dedicated infrastructure, such as tracks and signalling.
Source: Singapore Parliament Official Report (Hansard) for 9 September 2026. Republished on SGParliament.