LORONG BUANG KOK AND LORONG CHENG LIM (Metalling of farmways)
Parliament of Singapore · 21 March 1979 · 4th Parliament
Official Report, 21 March 1979, Vol 38, Issue 13 · Open in the reader (summaries, search, filters)
2
Mr Ng Kah Ting asked the Minister for National Development when all the farmways in Lorong Buang Kok and Lorong Cheng Lim will be metalled.
The Minister for National Development (Mr Teh Cheang Wan): Mr Speaker, Sir, some of the farmways in Lorong Buang Kok and Lorong Cheng Lim have already been metalled. As the cost of metalling the farmways is substantial, it is planned to complete the work in phases over the next two years.
Source: Singapore Parliament Official Report (Hansard) for 21 March 1979. Republished on SGParliament.