Dewan Rakyat · 24 November 2008
15th Parliament, session 1, meeting 3 · 832 turns · 60,729 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Datuk Ronald Kiandee) presided over the Sitting]
Oral Answers to QuestionsQuestions
1. Dato' Dr. Mohamad Shahrum Osman [Lipis] asked the Minister of Higher Education to state the less encouraging command of English among Malay students even though higher education institutions, especially UiTM, teach in English.
Mr Speaker, I seek permission to answer this question together with Question No. 16 from the Honourable Member for Libaran, which is scheduled for today as well, because it touches on the same issue.
Baik.
For the information of the Honourable Members, the Ministry of Higher Education (KPT) always emphasises the importance of English proficiency among local university graduates regardless of race. Several measures have been taken to improve the standard of English among its students, including: (i) offering English language skills courses suited to improving students' skills in that language. At Universiti Teknologi MARA (UiTM), the English course, namely English for Special Purpose, is, with permission, conducted for two hours a week over two to three semesters for degree students. The UiTM Language Academy is also working to meet the specific demand for English teaching and learning for programmes offered in 24 faculties; (ii) encouraging the use of English in tutorial sessions, the presentation of working papers, the presentation of final-year project papers and other informal learning sessions; (iii) offering English language elective courses as optional courses for students; (iv) encouraging weak students to attend short courses or language clinics during semester breaks; and (v) encouraging co-curricular activities in English, such as holding English weeks or months, debates, public speaking and intellectual discussions conducted in English, the English Language Camp, and several other programmes organised by student associations from time to time. That is all.
Thank you, Mr Speaker. Thank you to the Honourable Deputy Minister. A clear answer. For my part, I see that everything the Honourable Deputy Minister has just described are formal programmes organised by universities for their students. How far they are implemented, we are not sure. This is because these programmes are formal programmes that are already included in the prospectus and so on. So, what I see here is that English has not become a culture among students and lecturers. Before I raised this question, I had asked UiTM students. They said, "True, we study in English, we are taught in English in several subjects, but when in tutorials, lecturers and students are only encouraged to converse in another language, not English." Even in these informal settings they speak in languages other than English. So this has caused it not to become a culture.
Ya, Soalan.
My supplementary question is to what extent this English culture is practised among students and what steps they have taken. For me, if many subjects are taught in English but students still fail, there may be a mistake or a weakness in teaching methods. I seek an answer from the Honourable Deputy Minister.
Mr Speaker, for the information of the Honourable Member, the weakness of UiTM graduates in communicating in English is merely a general perception. It has been found that since the introduction of English-medium teaching programmes at UiTM, not only has the level of mastery of the language improved, but the employability rate of UiTM graduates is among the highest...
Mr Speaker, I thought the question was about culture...
The Honourable Member cannot interrupt like this, Honourable Member.
No, I asked about culture...
Yes, I mention this because, although this is about culture, I see that the culture of speaking English has indeed improved. That is what I wish to answer in terms of what we see now: it is true that the level of English use at UiTM has improved. That is all.
Thank you, Mr Speaker. Honourable Deputy Minister, could we not run a programme like the one we run for students whom we send overseas?
For example to Japan, Korea or Germany, where they are given intensive courses for three to six months so that they can master that language. Why do we not do the same for our university students before they begin the basic course they are supposed to take, starting with mastery of English first?
Mr Speaker, for the information of the Honourable Member, the Ministry of Higher Education (KPT) is indeed attentive and sensitive to the public's expectations regarding the level of English used in public higher education institutions (IPTA) and private higher education institutions (IPTS). We have indeed encouraged, and still encourage, the appointment of more foreign lecturers to teach. In addition, many of the courses being taught in universities are strongly encouraged to adopt English as the medium of instruction, so that
English is used more widely, and in the presentation of students' working papers the KPT also encourages students to use English more. That is all.
2. Tuan Chua Tian Chang [Batu] asked the Minister of Federal Territories to state the important conditions stipulated in the agreement between Kuala Lumpur City Hall (DBKL) on the privatisation of parking charge collection in the Federal Territory of Kuala Lumpur.
In the name of Allah, the Most Gracious, the Most Merciful. Mr Speaker, allow me to begin my answer by explaining the background and rationale for the operation and management of the parking system in the City of Kuala Lumpur. For the information of the Honourable Member for Batu, the management of parking charge collection in the Kuala Lumpur area is carried out by Kuala Lumpur City Hall (DBKL) and is divided into two categories. First, on-street parking, or TLK on street, and second, controlled parking, TLK off street, and both categories are on land owned by DBKL. On-street parking, namely TLK on street, is metered parking with a pay-and-display concept. The electronic parking system (SLKE), in which DBKL rents electronic units from suppliers, and the contract period between DBKL and the operating party for the old metered on-street parking system ended in 1996, and the contract was extended on a month-to-month basis. As for controlled parking, TLK off street, DBKL-owned land plots that have been identified are leased to operators to run parking operations. The appointment for both methods of implementing parking, namely TLK on street and TLK off street, with permission, is through open tender. The method of implementation is leasing and not privatisation as stated by the Honourable Member. For the information of the Honourable Member, the implementation of the Electronic Parking System (SLKE) involves only commercial zones in Kuala Lumpur. The main purpose of implementing SLKE is to make parking management in the City of Kuala Lumpur more efficient and effective. It indirectly overcomes the problem of illegal parking attendants who collect payments unlawfully, the problem of parking monopolies, the problem of double parking and the problem of traffic congestion in parking areas, especially in commercial areas and their surroundings. For the information of the Honourable Member for Batu, as a result of this installation, DBKL has received positive feedback from traders in the commercial zones of Desa Sri Hartamas and Bangsar. They have stated that this implementation has resolved the problem of visitors being unable to find parking in those areas. In addition, it has helped traders in the surrounding commercial areas to grow their respective businesses by attracting more visitors to their shops. It has also effectively limited the dominance of business owners who for a long time monopolised parking areas in commercial zones. Mr Speaker, returning to the earlier question, there are three main parties working together to play a direct role in managing this system, namely Kuala Lumpur City Hall (DBKL), the electronic parking system supplier, and the system operator. Accordingly, DBKL has implemented two different contracts: first, the contract for leasing SLKE from the supplier for installation and maintenance purposes. Second, the contract appointing a company to manage and operate the SLKE facilities. The first contract is the contract for leasing SLKE from the supplier for installation and maintenance purposes. It is a contract entered into between DBKL and the supplier of SLKE machines, who is responsible for supplying, installing and commissioning electronic payment and display machines, with permission, pay and display, to DBKL. Under this contract, four companies were appointed through open tender and allocated areas according to commercial zones. The important conditions are: (i) the supplying company is responsible for supplying, installing and maintaining the machines; (ii) the machines supplied must be usable for paying parking charges using Malaysian coins and may also be upgraded to accept cards; (iii) the system is coordinated with rates and time tariffs as well as payment rates that may change; and the tariff set is 80 sen per hour for the city centre and 50 sen per hour for outside the city centre; (iv) operating days and hours are Monday to Saturday, excluding Sundays and public holidays, and from 7.30 am to 6.00 pm; and (v) if a machine is found not to be operating, the contractor will be fined RM35 a day for each parking bay in the controlled area, and the leasing period is five years. Second, the second contract appoints an operator company for the purpose of managing and operating the SLKE facilities, a contract entered into between DBKL and the operator. He asks for the conditions, so I will read out the conditions to the Honourable Member for Batu.
Under this contract, the operator will lease parking bays from DBKL for the purpose of collecting payment for the electronic parking system charges. Seven companies, each operating seven different zones, have been appointed. The important conditions are: (i) the operator must ensure that all electronic parking system equipment is in operating condition at all times; (ii) the operator is responsible for collecting all transaction data from the system; (iii) the operator pays a monthly rent for the total number of parking bays; (iv) the operator is responsible for ensuring that all facilities related to SLKE operations, such as parking lines, signboards and others, are in good condition; and (v) the operator is responsible for collecting TLK charges at all SLKE machines designated by DBKL.
Honourable Member, please summarise. Summarise, Honourable Member.
If one does not understand the history, it is a bit difficult. If we want to understand why DBKL needs to...
We are in the oral question session, Honourable Member, yes.
In this contract, the operator will lease parking bays from DBKL for the purpose of collecting payment for the electronic parking system charges. Seven companies, each operating seven different zones, have been appointed. The important conditions are: (i) the operator must ensure that all electronic parking system equipment is in operating condition at all times; (ii) the operator is responsible for collecting all transaction data from the system; (iii) the operator pays a monthly rent for the total number of parking bays; (iv) the operator is responsible for ensuring that all facilities related to SLKE operations, such as parking lines, signboards and others, are in good condition; and (v) the operator is responsible for collecting TLK charges at all SLKE machines designated by DBKL.
Terima kasih.
Thank you, Mr Speaker, thank you to the Honourable Minister of Federal Territories for giving such a lengthy answer. Previously I thought only our public transport system was this confused, but it seems the parking system is also very complex.
Yes, the Honourable Member's question.
My question is, first of all, why do we not manage this parking with a uniform system in which the companies assigned to run this parking are given to only a few companies, yet we find that there is wide coverage? The parking problem is in fact a burden on the people. Although the government has already reduced fuel prices many times, if parking keeps increasing and we cannot, in fact, cannot solve the problem. I still want to know what the reason and rationale are for the government to design these parking spaces, and whether this new parking system truly reduces, first of all, the burden on the people.
Second, to reduce traffic congestion, with permission, and also to enable shop owners or landlords near this parking to have good parking access. These are the criteria we should consider before we think about the issue of suppliers and operator tenants. Thank you.
Please answer briefly, Honourable Member.
Thank you, Honourable Member for Batu. The parking system the Honourable Member mentioned just now, I see is not confusing, with permission. It is simple. The parking system operated by Kuala Lumpur City Hall (DBKL) ended in 1994, where the agreement between the operators at that time and also with DBKL was extended from month to month. So, regarding the Honourable Member's question why we do not manage this parking with companies and the reasons, I have already answered earlier. Parking management in the city needs to be operated more efficiently and effectively. There are several matters I mentioned earlier where we have problems with illegal parking attendants. Collecting payments unlawfully, the problem of parking monopolies in commercial areas that resulted in newspaper reports from objections raised by local residents. The problem of double parking and also the problem of traffic congestion, and these operators, Mr Speaker, were appointed through open tender. Thank you.
3. Dato' Shamsul Anuar bin Haji Nasarah [Lenggong] asked the Minister of Tourism to state the ministry's efforts to popularise domestic tourism products throughout the country, especially in Lenggong, which is rich in natural beauty, recreational areas, caves, traditional villages, the Kota Tampan Pre-History Museum and so on. Whether the ministry has a specific allocation to develop and advance areas of this kind.
Mr Speaker, I thank the Honourable Member from Lenggong. The ministry is indeed aware that the Lenggong area has natural beauty, recreational areas, caves, traditional villages and the Kota Tampan Pre-History Museum. In this regard, to enhance the tourist appeal of the Lenggong area, the ministry under the Eighth Malaysia Plan has provided an allocation of RM2.8 million to develop tourism facility buildings
at the Tasik Raban area, namely for the construction of accommodation and other facilities such as restaurants, parking and so on. Under the Ninth Malaysia Plan, an allocation of RM4.45 million has been provided to add more facilities in Lenggong, namely by adding more chalets in the existing complex as well as beautification of the surrounding areas of the complexes. Apart from that, under the Ninth Malaysia Plan, an allocation has also been provided for upgrading programmes, such as upgrading the jetty at the Tasik Raban R&R rest area, allocated RM50,000, upgrading the quarters building as a surau at the Lenggong rest house at RM100,000, and upgrading the pedestrian walkway and wakaf facilities at the Lata Kekabu Recreational Forest, Lenggong, at RM50,000, and this has been fully completed.
I thank the Honourable Minister for the answer just now. For my supplementary question, I congratulate the ministry on its continuous efforts to promote new tourism products and destinations in this country and also abroad. My question is, what approach or method is used by the ministry in our efforts to showcase new tourism products so that they can meet the needs and tastes of tourists, who are always diverse and changing? The point is that we want tourists who come to this country once to come again, because they can see something different each time they visit this country. Thank you.
Mr Speaker, and thank you, the Honourable Member for Lenggong. In fact, the Ministry of Tourism acknowledges that among the challenges of tourism is providing new products so that tourists keep coming back to our country. That is why, from the Ministry of Tourism's perspective, we see that among the potentials we need to strengthen is, for example, the MM2H Programme, which is the second home programme, and we also need to look at developing medical tourism, or Pelancongan Perubatan. We also see that we need to aggressively develop the eco-tourism approach, with permission, that we want to establish. If we compare other countries with our country, we do a lot of what they also do. That is why, for the Ministry of Tourism, the approach to promoting our country needs to be shaped into more aggressive approaches. We cannot deny that other countries are always trying to create approaches that are rather similar to our country's. That is why, if we look at the definition of tourists who keep coming back to our country, they are usually tourists from Singapore. This is because we know and accept the fact that the journey to our country is very short, and they also see that buying food and accommodation in our country is cheaper than in their country. However, for other tourists such as those from ASEAN countries and also from distant countries such as Europe, the United States and also South America, we see that among the approaches we need to strengthen more is towards tourism, eco-tourism, with permission. Likewise, we see that creating facilities, with permission, for conventions and also exhibitions is a good approach. I have been informed by many parties that when tourists come to our country, when they see that our products are attractive and see that our country is peaceful, they are interested in doing business in our country. That is why, for the Ministry of Tourism, we see that the arrival of these tourists needs to be viewed as an asset that will come back. If we look at it in terms of expenditure, our cost to bring tourists compared with their cost to come to the country, their cost of coming to our country is higher and can benefit the world economy. That is all, Mr Speaker.
Thank you, Mr Speaker. I would like to ask this Honourable Minister, for the purpose of popularising local tourism products
tourism products, whether the Honourable Minister agrees that certain roads or certain sites and certain buildings are also historical sites? Likewise, there are certain roads. If he agrees that such a road can be made into a tourist site, does the Honourable Minister also agree that, to popularise that road, multilingual signs should be provided on that road? [Uproar in the House] What is wrong with that? If we agree that roads such as those in Melaka, namely Jonker Street and Helen Street, are indeed historical sites. They are not merely ordinary roads, but historical sites. Does the Honourable Minister agree that it would be better if we provided multilingual signs to promote that road?
Thank you, the Honourable Member for Kota Melaka. I hope the Honourable Member for Kota Melaka does not want to politicise tourism. In fact, if we look at it...
Of course I do not want to politicise it. That is indeed up to...
That is politicising, that is. We know.
Honourable Member, if you ask a question, let me answer it. Be a bit of a gentleman. In fact, Mr Speaker and the Honourable Member for Kota Melaka, the Ministry of Tourism acknowledges that there is a need for tourism facilities and tourist attractions to be provided in certain languages. However, I answered two weeks ago that, from the Ministry of Tourism's perspective, we have what is called ‘papan tanda pelancongan’ (tourism signboards). So, the ‘papan tanda pelancongan’ for the Ministry of Tourism are the best signboards on which to put languages so that tourists understand tourism products. But if we only think that putting the road in various languages will supposedly attract tourists, for me that is a thinking that is so shallow, Honourable Member for Kota Melaka. This is because when a tourist sees a road, they do not understand what that road means. If we put it in various languages, Jalan Alur in Chinese, Indian languages, Arabic, they will not understand. What they understand is the tourism signboard we put up. It is not only the language, the explanation, history and background that they want to see. This is because tourists go to a country and want to know what we offer to attract tourism. So I ask the Honourable Member for Kota Melaka, if we want to talk about signboards, the best option is to place the responsibility with the Ministry of Tourism. Do not let state governments and also state municipal councils try to politicise this on the pretext that it will satisfy tourists.
The Chief Minister is indeed stubborn. He makes everyone's life difficult.
If they want to put it in other languages, in Penang, many tourists come from the state of Siam.
May I have an explanation of the answer?
No need for an explanation.
Honourable Member, go to Patoh, go to Patoh.
Supplementary question, supplementary question.
4. Tuan Saifuddin Nasution bin Ismail [Machang] asked the Minister of Science, Technology and Innovation to state what the 'success stories' are from the government's efforts to establish 'ScienceFund' and 'TechnoFund', which were allocated RM1.2 billion and RM1.5 billion respectively under the Ninth Malaysia Plan (RMK-9).
Thank you, the Honourable Member for Machang. Mr Speaker, the Ministry of Science, Technology and Innovation (MOSTI) is responsible for planning research studies and new technological innovation by ensuring that the nation's mission achieves its objectives. During the Ninth Malaysia Plan (RMK-9) period, the development core focuses on utilising science, technology and innovation as the main driver in enhancing the nation's capacity to acquire and use knowledge and in promoting innovation. Priority will be given to research and development, namely R&D (with permission), that is market-oriented and to increasing the rate of commercialisation of R&D outputs. This differs from the objective under the Eighth Malaysia Plan, where the focus was only on R&D. In line with this, under the Ninth Malaysia Plan, MOSTI has provided science funds, with permission, ScienceFund, and technology development funds, or with permission, TechnoFund, to continue the value chain from research and development to commercialisation. It is informed that the actual allocation for ScienceFund and TechnoFund after the mid-term review of the Ninth Malaysia Plan is RM550 million and RM680 million respectively. This amount differs from the original allocation as raised by the Honourable Member for Machang. Mr Speaker, at present it is still too early to announce success stories for the ScienceFund and TechnoFund programmes, because these programmes were only implemented at the beginning of the Ninth Malaysia Plan, and generally the implementation period of an R&D project takes two or three years. As for ScienceFund, in fact, programmes involving five years, particularly those involving molecular biology, with permission. For the information of all Honourable Members, until November, only eight projects under ScienceFund have been completed out of 2,504 approved projects. Meanwhile, 128 approved TechnoFund projects are still in the process of implementation. The achievements of the eight completed ScienceFund projects include 21 international publications, two copyright registrations at the national level, two awards obtained at the national level, and eight master's graduates produced. Regarding the capacity and success stories, with permission, of the nation's R&D since RMK-8 until now, through funding and the Intensification of Research in Priority Areas, or IRPA, whose structure has been divided into two components, ScienceFund and TechnoFund, 148 projects have been identified as having potential for commercialisation. Of this number, 179 patents have been registered and 53 projects have been commercialised. The total number of international and national publications is 3,557. In addition, a total of 361 awards from within and outside the country have been successfully obtained as recognition of local R&D efforts. In terms of human capital development in the fields of science and technology, IRPA has produced 1,692 master's graduates, of whom 74% are graduates at the master's level, or with permission, master of science, while the remaining 26% are doctoral graduates, or with permission, PhD. Thank you.
Thank you, Mr Speaker, and thank you to the Honourable Minister for the answer. What I understand is that TechnoFund is a fund to help private companies collaborate with local researchers to commercialise R&D outputs. From feedback I have received from the Honourable Minister's researchers, what the ministry
is aware that in managing this fund there are problems in the form of smooth governance and monitoring of fund use to achieve satisfactory results. Specifically, what I mean is that there are situations where grants under TechnoFund have been approved by the ministry, but the researchers working with companies have not received payment or have received it late, and this affects their research work. Although the Honourable Minister mentioned that the budget has been reduced, the RM550 million figure is still significant, and this research did not begin in a vacuum. Long before TechnoFund and ScienceFund were established, research work was already under way. So, can the Honourable Minister explain what technologically advanced products have been produced and funded through this TechnoFund, and name the companies that have commercialised such technologies. Thank you.
Thank you, the Honourable Member for Machang. Mr Speaker, I would like to address what was raised regarding late payments and so on. I would only inform that this matter should not actually exist. If there are any, they are isolated cases, with permission. Every year the ministry processes TechnoFund applications, in particular, for example over the last three years, ScienceFund, and only 2,500 have been approved. This is not a small number, it is very many. For TechnoFund, applications over the last three years were 705, and the number approved was about 170, or 37%. In order to speed up processing, the ministry has improved its practices, and about two years ago it took about six weeks to process from application to approval. At present, we are working to use ICT so that most processing and information for applicants can be obtained online, and our proposal is that we can give feedback to applicants within a period of 21 days, and this is in a trial process according to the ICT systems currently being run. I would like to inform you that there are indeed certain cases, but not many, where perhaps the payment is somewhat late, but that is not a problem on the ministry's side. Often there are internal problems within the company, particularly if shareholders change and certain milestones that we set cannot be fulfilled by the company. This is because before we approve, payment is usually made in three instalments, namely advance, first milestone, second milestone and third milestone. So if there are certain cases, the company or research institution may contact the ministry. As for specific cases, there are far too many companies to touch on. For 2008 alone, for example, there were 151 applicants. For 2008 so far, 73 have been approved, using funds of about RM655,000. The Honourable Member and the suppliers of technology companies that are already in the process of commercialisation in certain sectors. I will only say that it involves no fewer than five clusters, from ICT technology, the technology industry from C2space, and also science core such as metrology, chemistry and so on.
Thank you, Mr Speaker, and thank you to the Honourable Minister. My supplementary question, considering that the allocation has been reduced but is still large for ScienceFund and TechnoFund, is what strategy the ministry has planned, apart from the Ministry of Higher Education, in an effort to strengthen capacity building in the field of R&D at IPTAs, particularly in efforts of cooperation between IPTAs and GLCs as well as IKS, so that the quality of this R&D will continue to be improved from time to time, so that its market is not only at the domestic level but can also be showcased at the international level.
Thank you, the Honourable Member from Arau. In terms of the allocation I mentioned earlier, it indeed reflects
a very significant reduction. The ministry is discussing with the Ministry of Finance to ensure that, despite the significant reduction, R&D programmes, particularly in terms of costs in the area or the focuses that have been put forward, will not be hindered by the reduction. Mostly, for your information, if I give further information, the funds are only sufficient for next year. However, the Ministry of Finance has said it can review other funds, because apart from these two funds, we manage 14 other funds across several types of clusters. There is a possibility we will create internal management to ensure there are no obstacles. In terms of networking with higher education institutions, the ministry, MOSTI, is working together with the Ministry of Higher Education and also other departments or ministries such as the Ministry of Agriculture and the Agro-Based Industry in these discussions. For your information, among the reductions faced is that R&D for agriculture has been returned to the Ministry of Agriculture. So, what remains is the programme for biotechnology that falls under the Agriculture Biotechnology Institute, which is administered by MOSTI. However, we are constantly discussing with other ministries to ensure that human capital and certain training for our researchers will continue. For your information, through the Brain Gain Programme that we sponsor under MOSTI, and also the National Science Fellowship, this year the ministry has doubled sponsorships from 200 to 400 for outstanding Master's and Ph.D. researchers who can be absorbed into overseas programmes. These are among the strategic measures to ensure that human capital and networking continue. Thank you.
5. Dato' Razali bin Haji Ibrahim [Muar] asked the Prime Minister to state: (a) the number of government officers who have applied to take up part-time work since it was announced in June this year; and (b) how the government monitors the performance of these officers so that this part-time work does not affect their productivity when carrying out their main duties as government officers.
Thank you, the Honourable Member. Mr Speaker, based on information gathered by the Public Service Department up to 21 November 2008, a total of 934 government officers have applied to carry out part-time work or outside employment. Of this number, 913 have been given permission by their respective departments to carry out part-time work or outside employment. To monitor the performance of government officers carrying out part-time work so that it does not affect productivity, as government officers, heads of departments are required to ensure that the part-time work carried out meets the rules that have been set, such as: (i) it is not carried out during the officer's working hours and while the officer is required to perform their official duties; (ii) it does not affect the officer's duties and status as a public service officer; and (iii) it does not conflict with the interests of the public service. If there are officers found to have breached any of the above conditions, the permission will be withdrawn. Thank you.
I believe the government's decision to grant permission to this support group of government staff is to enable them to earn additional income. Of the number mentioned earlier, 934 people, it turns out that not many government staff have applied, and we have also been informed that some applications were not permitted or were not approved. The only question here is, why are there not many? Why were some not approved, and what is the effect on the government when it deals in a black-and-white manner with government staff rules on discipline and conduct? This is because we know there are many more who do part-time work without even applying. So, will we take action? Do we want to encourage it? If I may ask, my question is actually what types of part-time work are encouraged that can be done without distraction, do not affect work, and can generate profit? If there are such types of work, I think it would also be good to give them to the unemployed to take part in the types of part-time work done by government staff. Thank you.
Thank you, Honourable Member. So, in fact, the number applied for, as I mentioned just now, was 934, but the number approved was 913. So, that means not many were not approved. Those not approved may not have met the conditions I mentioned earlier. Regarding the work applied for, most of it was work done in line with each person's abilities. For example, if we look at teachers, the permission given was to run tuition classes. Lecturers or doctors, some opened clinics on a part-time basis, and so on. Most of the work done was work suited to each person's profession and did not affect their performance at their own jobs. As for action, we actually need permission in order to protect the interests of the officers concerned. For instance, recently there was an incident in Perak, a robbery at a petrol station, in which a government officer involved, who worked with the Perak Mufti Department, was killed. But fortunately for him, after we asked for a report, it was found that he had obtained permission to work, so that means we will pay him all allowances, and his pension will go directly to him, he gets to enjoy it. This is among the things we do, firstly to protect the interests of those officers themselves. The permission required is not meant to cause hardship or anything of the sort. Thank you.
Thank you, Mr Speaker. Honourable Minister, is the government aware that there may be two reasons why those who take up part-time work do so. The first is that their salary is not enough to support their children. The second is that they may be disappointed because they want to express their feelings, so they take up part-time work. But what I want to ask is whether it may be because of these very senior officers, these seniors such as the KSU, KPSU, and directors, who get extensions too many times, and in the end those below them do not get promoted. When they are not promoted, they do not have enough money. Without enough money, they take up part-time work. Thank you.
Thank you, Honourable Member. So, perhaps among those whom the Honourable Member mentioned, there are such reasons. But if we look at the applications made, most came from officers at the lower levels, not officers at JUSA level, because there are only five JUSA officers. These people are involved in professional work. So, as for other reasons, I cannot be certain, but I am confident that they work to earn more income. There is a possibility, for example with doctors. I think it is also good for us to encourage them to take up side work, rather than those who were educated overseas, as with the problem we face now. We have issued so many scholarships to train doctors.
A further 250 people did not return to serve in our country because the reason was that the income was small. So, if we give these people an opportunity, I think they may be more interested in returning and working in our country. Thank you.
6. Mr Tan Kok Wai [Cheras] asks the Minister of Education to state what strategies and programmes there are to achieve the goal that every citizen receives quality and equitable education, including fulfilling the aspiration of every race to obtain education in their own mother tongue without facing a shortage of places and opportunities to attend school, such as in SRJK Cina and Tamil schools.
Mr Speaker, the government has indeed given a high commitment in providing educational opportunities to children of school age across the various streams.
As an effort to ensure every child goes to school, the government has provided various types of assistance to students, especially students from poor and underprivileged backgrounds across the country. The initiatives implemented by the Ministry of Education Malaysia (KPM) are to ensure that all children who should attend school are registered at school. Among the assistance that has been given are the establishment of the Poor Students Trust Fund (KWAPM), the Textbook Loan Scheme (SPBT), the Supplementary Food Programme, scholarships, hostel facilities assistance, the Tuition Aid Scheme, and the provision of special allowances to all special-needs students. I wish to state here that such assistance is channelled to eligible students regardless of school stream. For the information of the Honourable Members as well, KPM has already implemented the policy of compulsory education at primary school level starting from 2003, as provided under Section 29A of the Education Act 1996. For the information of the Honourable Members, the Ministry of Education Malaysia also provides facilities to support and develop mother-tongue education in schools through various efforts such as building new schools, relocating schools with few students to areas of high population density, and increasing enrolment capacity. The Education Act 1996 guarantees that the mother tongue of the Chinese and Indian communities remains the main medium of instruction in Chinese national-type schools and Tamil national-type schools. Meanwhile, the Education Act provides that Chinese and Tamil languages shall be offered in national schools if there is a request from 15 parents to do so. In line with this, the Ministry of Education has taken steps to make the mother-tongue programme in national schools a success. This includes various explanations and encouragement to parents by schools to allow their children to take up these subjects. Thank you.
Thank you, Mr Speaker. Shortage of development funds and shortage of schools are the main problems, long-standing problems experienced by SJK(C) and SJK(T) for several decades now. I would like to ask the Honourable Deputy Minister, how can SJK(C) and SJK(T) solve their funding shortage when, for example, under the Ninth Malaysia Plan (RMK-9), the total development allocation for SJK(C) and SJK(T) is only 3.5% and 1% respectively of the total development allocation for Chinese and Tamil stream primary schools across the country. This is the smallest allocation. Secondly, for example, a few weeks ago when the Economic Stimulus Package was announced, although an additional RM50 million was given to SJK(C) and SJK(T) schools, but for example across the country there are 1,288 SJK(C),
if calculated on average, this RM50 million is only enough to pay RM29.50 per day for a period of one year only. This is a very small amount of funds and cannot solve the core problems faced by SJK(C) and SJK(T). The second question, regarding schools ...
Just one question, Honourable Member, only one question is enough.
My original question has two parts. Regarding new schools, has anything happened to the government's election promises made to win votes? The construction of six ...
DAP's many promises still have not been fulfilled.
Continue, Honourable Member.
The construction of six new SJK(C). What has happened to them? Because I want to inform Mr Speaker, and also for the information of this House, that in 1999, nine years ago, five new schools were promised by the government. Until now, only four have been completed.
That's enough, Honourable Member.
Fulfil DAP's promises first, then.
What is the problem that takes such a long time to build just a few primary schools? This shows the inequality and injustice ...
Don't make a speech, Honourable Member.
...attitude and policy of the government towards mother-tongue schools? Please answer.
Yes, thank you. The Honourable Deputy Minister, please.
Thank you, Mr Speaker. I wish to say that there is misleading data being presented to the House. Firstly, the Honourable Member says Barisan Nasional's promises were made to win votes, but the Honourable Member is using wrong statistics! This is because up to last year, since 1999, seven new SJK(C) schools have been built, and not four as claimed by the Honourable Member. That is a wrong fact.
He just shoots from the hip. How would he know?
Many were closed anyway.
This is really racial. Big liar.
Honourable Member, let's relax. I am only stating the facts. If the Honourable Member says that what was announced by the Honourable Deputy Prime Minister was divided among 1,288 schools, that is a tactic of the opposition, especially the Honourable Member himself, because that did not happen. In our system, what we have channelled is to schools receiving capital grants. Once again I wish to inform the Honourable Member, for capital-grant schools there are 880 SJK(C), SJK(T) out of a total of 524, of which 374 are SJK(T) capital-grant schools, and one other, 411 mission schools, which have capital-grant status, and there are also 154 government-aided religious schools. This means it crosses religion and race. That is the first point, and the data used, divided by 1,288, is wrong, Honourable Member.
I wish to answer what the Honourable Member asked, namely development funds. Yes, in terms of the Honourable Member making calculations based on development funds, there may be some room that needs to be increased. That is precisely why the Ministry of Education took the initiative from 29 October to 31 October, we held a seminar on the direction of government-aided schools. We invited 157 representatives from the LPS, including Dong Jiao Zhong, and representatives from government-aided religious schools came. We listened to their pleas. In the seminar, which lasted three days and two nights, there were conclusions, and the conclusions were brought by the Honourable Minister to meet the Honourable Minister of Finance. Within four days, an announcement was made of RM200 million for these four types of schools. Honourable Member, this is an initiative from the Ministry of Education Malaysia. What the Honourable Member says, that RMK-9 supposedly gives 3.5% of the total. Honourable Member, in this context I say we do not deny that there is room for us to improve, because in RMK-9 there is only RM100 million for development funds for all types of government-aided schools. So there is already justification for us to improve that. That is why the Honourable Deputy Prime Minister made that announcement, and I hope it is a good start and it will be continued. As for what the Honourable Member says about 3.5%, if we talk about estimates, there are two aspects the Honourable Member must look at. The Operating Budget Estimates (ABM). The Honourable Menteri Besar is here, ask him. If you want to administer a state government, there are two: the Development Budget and the Operating Budget. If we combine both of these, for SJK(C) it comes to 15.5%, not as the Honourable Member takes just one aspect, 3.5% of development funds. That may only be a matter of fact, and that is what I want to tell the Honourable Member: if we speak in this context, it should also be looked at in totality, Honourable Member. Thank you.
Thank you, Honourable Member, Mr Chairman, thank you, Honourable Deputy Minister. I in fact have truly great respect for the Barisan Nasional Government and the Ministry of Education in giving educational opportunities to our children. The opposition, that is their job, they always oppose. Everything is wrong. Mr Speaker, I want to ask the Honourable Deputy Minister, some schools have far too many students, and there are also some that have too few pupils even though the ministry's efforts have already been made.
I would like to ask the ministry how many there are now, among the three types of schools, national schools, Tamil national-type schools and Chinese national-type schools and so on, that consist of schools with too few pupils, and this may affect the opportunities of students because these schools are located in remote places. What immediate steps does the government take to overcome this problem so that learning opportunities can be obtained by all students, our children, in the area. Thank you.
Thank you, Honourable Maran, a good question. If we look at schools with few pupils, the ministry's definition is any enrolment below 150. If we look in the context of SJK(C), SJK(T) or national schools, I can give that figure in writing. But in general, if we want to close schools supposedly because they have few pupils, that means many schools would have to be closed. So we have to be realistic. There are areas where there may only be 100 houses, and the enrolment will never increase beyond 150. Because we must provide educational access to all children, we cannot close schools arbitrarily. So one method used is for areas like an estate that has been around for a long time and is now taken over by foreign workers who have permits. Perhaps now they no longer live there, and their children do not attend school there. So there is one
technique to relocate this SKM to areas with higher population density. That is the technique used. Second, for urban areas. We also see that national secondary schools, SJK(C), SJK(T) too, we see that in these central urban areas, sometimes enrolment in the town centre itself is declining, while for areas adjacent to residential estates it shows rising enrolment. So in this situation, as a short-term solution, we have agreed to build cabin classrooms that are fully equipped, and this is the fastest method, built in one or two weeks, and they can be completed before the school session begins. Thank you, Honourable Member.
7. Mr Billy Abit Joo [Hulu Rajang] asks the Minister of Housing and Local Government to state whether a state of 'glut' exists in Malaysia. If it does, what actions and steps have been taken by the ministry to improve the situation.
Mr Speaker, generally speaking, it can be said that a situation has emerged where supply has exceeded demand in the property market across the country. Based on the Property Market Status Report 2008 issued by the National Property Information Centre (NAPIC) under the Ministry of Finance, for the second quarter of 2008, a total of 4,540 residential units were offered by developers and 1,203 units were sold, recording a sales performance of 26.5%, compared with 11,993 units offered for sale by developers and 2,582 units sold in the same quarter in 2007. From the second quarter of 2007 to the second quarter of 2008, there were 24,151 unsold residential units. The Ministry of Housing and Local Government takes this situation seriously and has joined hands with other government departments and agencies such as the Ministry of Finance and state governments to work to improve the currently sluggish property market prices. Among the steps taken are: (i) reducing stamp duty by 50% on sale and purchase agreements for property valued not exceeding RM250,000; (ii) establishing a fund for the Housing Credit Guarantee Scheme (SJKP) to enable those who do not have complete proof of income to obtain housing loans; (iii) holding property expos across the country to boost activity in the property market; (iv) encouraging developers to reduce the selling prices of their properties or to build more low- and medium-cost houses, because price is still the main determinant in any property transaction; (v) encouraging government officers to use the housing loans they are eligible for to buy property; and (vii) allowing EPF contributors to withdraw part of their contribution savings to buy property.
Thank you, Honourable Minister, for the answer just now. I would also like to know, Honourable Minister, what the uncertain economic effects facing the world now have on homeowners. Like in the United States, the impact has been very negative, to the extent that many have had to sell their homes. What steps are being taken so that the situation in Malaysia remains stable and does not become like that in the United States.
Mr Speaker, I think our country's situation is indeed different from the United States. In America, the subprime mortgage problem, with permission, is the result of excessive lending by certain individuals, so that in the end they could not repay their debts. In our country, this situation is still under control, but if there is a problem where borrowers cannot repay, the ministry consults with the banks so that the repayment period can be relaxed and extended, as is done for government officers. In the past, the repayment period was extended from 25 years to 30 years so that their burden can be eased, that is our proposal.
Thank you, Mr Speaker. My supplementary question is about the impact of the number of houses that cannot be sold. REHDA has requested that the Bumiputera quota allocated but not sold be allowed to be sold to other races, and another request is that the Bumiputera discount be abolished because they say they are suffering losses due to that discount. Will the government accede to this association's requests? Thank you.
Mr Speaker, it must be explained that the Bumiputera quota was in fact created to give Bumiputera an opportunity to own property. Mr Speaker, if there is no demand when a property is put up for sale, there is a mechanism for approval so that the property can be sold on the open market to other races. Sometimes this mechanism is slow, sometimes taking several years or five years, because there is no demand, and the quota cannot be released for sale to other races. This has become a heavy burden on developers. So in such circumstances, the ministry has negotiated with the state government so that this mechanism can be made more effective, so that release can be carried out as quickly as possible if there is no demand from Bumiputera. Apart from that, regarding the Bumiputera discount, REHDA has proposed that, say, for luxury properties priced above half a million or one million, they feel this discount should not be given. However, we still, because this is the right of the state government, are in negotiations with the state government on whether a reasonable agreement can be reached so that the discount can be set at a level at which we can give it to those who truly need this housing, and not give discounts to people who do not need it. We are negotiating with the state government so that a more complete agreement can be reached.
8. Tuan Haji Taib Azamudden bin Md Taib [Baling] asks the Minister of Agriculture and Agro-based Industry to state what efforts the government is making to control the monopolistic attitude of big traders in determining the very high price of fish in the market.
Mr Speaker, it cannot be denied that there is monopoly by big traders in determining fish prices in the market. The government, through the Ministry of Agriculture and Agro-based Industry, has established several measures to help fishermen obtain reasonable prices, especially at the landing level. At the landing complexes and jetties managed by LKIM and the Fishermen's Associations, there are fish marketing projects in which the local Fishermen's Association buys catches at reasonable prices, namely prices comparable to the offers from other buyers. There are several methods of purchasing fish by the Fishermen's Associations, such as open auction, in which the fish are graded according to size and species.
Buyers will compete to offer the highest price. The success of an open auction is influenced by the supply and demand for the fish, where supply is limited and buyers are many. Open auctions have been successfully implemented at PNK Tanjung Dawai and also Kuala Kedah, for example. Another sales system is through the consignment system, with permission, where pelagic fish such as kembung, selar, cencaru and selayang and so on are sent directly to large buyers in major cities, and the price is determined by the buyer. In this case, the role of the ministry is very important to ensure that these types of fish are priced at the supply level, namely at the jetties and complexes. Large buyers will determine the price in the market, and it depends on the costs involved, such as transport, packaging and so on. Apart from that, LKIM is also actively implementing direct fish sales using vehicles such as three-wheeled motorcycles and lorries, which enable fishermen or entrepreneurs to market fish to more distant locations, such as housing estates, farmers' markets, night markets and so on. So far we have 18 entrepreneurs using one-tonne lorries and 25 entrepreneurs using three-wheeled motorcycles in states such as Kedah, Selangor, Kelantan, Pahang, Sarawak and Terengganu. Fishermen's participation in fishermen's market activities, where fishermen market directly to consumers and buyers at suitable fish landing areas. To date there are 15 fishermen's markets throughout the country, including in Kuala Besar, Kota Bharu, Bakun Sarawak and so on. This measure can reduce many intermediaries and middlemen, and the price obtained by fishermen is fairly high, and the fish marketed is fresher. Apart from that, fish that were once sold as fertiliser fish, which fishermen often call mixed fish, can now be processed as 'otoshimi', with permission, namely fish flesh, whose price was previously quite low at 20 sen per kilogram, but has risen to 70 sen per kilogram. This has also increased fishermen's income. We also have the Fishermen Fund Loan Scheme by LKIM, which enables PNK to carry out fish marketing, because fishermen and borrowers must sell their produce to PNK as one of the conditions of the loan. The price offered by PNK is comparable to other buyers. Another method is the use of insulated fish boxes or with a 'food-gradeable' permit, approved by SIRIM and the Ministry of Health, which has been able to maintain the freshness of fish and provide good returns to fishermen. Thank you.
Thank you, Mr Speaker, and thank you to the Honourable Deputy Minister. Regarding the answer just given by the Honourable Deputy Minister. My question concerns the SPKR, or the Community Welfare Development Scheme, which the government allocates for an application of RM10 thousand, but when it is done through tender, what actually reaches the fishermen is only within the range of RM5 thousand. So with RM5,000, fishermen are unable to provide higher-quality equipment, and this causes fishermen to bear very high costs. Has the government not considered giving the responsibility directly to the National Federation of Fishermen's Associations, NIKMAT, or the State Fishermen's Associations to take on this responsibility? Likewise, regarding the fish market matter just now, especially during the monsoon season like this. Has LKIM not considered setting up a fish stock scheme, so that fish can be bought from fishermen during non-monsoon periods and marketed at moderate prices during the monsoon, which would at the same time give a position in which our fishermen no longer depend on middlemen. Likewise in Kuala Kedah and elsewhere, the Department of Fisheries does not allow fishermen to use long-tail engines or pole engines, which are cheap, but requires them to use outboard engines, whereas these outboard engines
cost RM8 thousand to RM9 thousand and above. This burdens the fishermen. Requesting an explanation.
Thank you, Honourable Member. Honourable Member, first, the Community Welfare Development Scheme you mentioned falls under the Ministry of Rural Development, and thank you, Honourable Member, for asking whether this can be managed by the fishermen themselves. God willing, Honourable Member, I will bring this matter forward so that it...
Honourable Member, please answer what is related to the original question.
So regarding the monsoon season, earlier I explained to the Honourable Member several interventions, with permission, by the ministry to ensure that fish prices are reasonable. Thank you, Honourable Member, many of the interventions we have carried out have given fairly good returns. As the Honourable Member said just now, for the monsoon season, yes, Honourable Member, we have now provided cold rooms at the jetties and landing sites, where if the purchase price is found to be too low, they are placed into the cold rooms and will be released to give a reasonable price, especially during the monsoon seasons. As for the engines mentioned earlier, where we emphasise the use of outboard engines, we have provided all assistance. Although we emphasise that they must use a certain type of equipment, we have certain funds to help so that they comply with the rules we impose, and funds are provided to help these fishermen. Thank you.
Thank you, Mr Speaker. I was very interested in the answer given by the ministry just now, but I would like to inform you that there are several months, especially in the East Coast area, of rough seas. During this rough sea season, fishermen cannot go to sea, and the problem is that these fishermen will borrow from certain people to finance their living expenses while they cannot go to sea.
Does the government see this as a serious matter that needs assistance for four months or more, because in total, fishermen on the East Coast can only go to sea for four to five months. So for the rest of the time, they cannot go to sea. Furthermore, those who lend this money will buy their produce casually, at whatever price they like. So I want to ask the ministry, is the ministry aware, and what efforts are there to help during the months when fishermen cannot go to sea, especially those we have given boat assistance and so on.
Thank you, Honourable Member. We are indeed aware of the times when they cannot go to sea. That is why I mentioned earlier the facilities provided, such as the cold rooms and so on, so that these can be stored and released to cover current expenses while the sea is rough for up to three or four months. At the same time, we have also established several schemes for these fishermen, such as inland fish farming through aquaculture and so on, where the prices of these fish also obtain a good price in the market. I know that in Terengganu there are several projects that we are carrying out together with the state government as one way to help with the income of these fishermen who cannot go to sea. I also referred earlier, Honourable Member, to the fishermen's fund. Where if they are in debt, especially to certain tauke, they must pay off that debt, and we also have a fishermen's fund so that we
can help with equipment needs. They do not depend on the places where they are in debt, and this is what we are trying to eliminate little by little. We know this is not easy and this has dragged on for so long, but these are several schemes that we have set up. For the information of the Honourable Member, they can discuss with LKIM during times when they cannot repay. As for the taukes and other debts, this is something they must deal with together, and it is here that we also hope that the role of the local fishermen's associations can help ease the burdens mentioned by the Honourable Member just now. Thank you.
I have been informed that the Honourable Member for Pasir Salak was unable to attend for question number nine. [Question No. 9 – Y.B. Dato' Haji Tajuddin Abdul Rahman (Pasir Salak) absent]
10. Datuk Eric E. Majimbun [Sepanggar] asks the Minister of Home Affairs to state the number of foreigners who possess questionable identity cards and the government's action against citizens who have the same identity card numbers.
Mr Speaker, thank you to the Honourable Member for Sepanggar who has submitted this question this morning. For the information of the Honourable Member, so far the National Registration Department does not have statistics on foreigners who possess questionable identity cards. However, from 2004 until June 2008, the National Registration Department has been able to detect 585 fake MyKad through complaints received. Based on these complaints, the National Registration Department has carried out investigations and prosecutions in 429 cases. Meanwhile, the remaining 156 cases are being handled by the Royal Malaysia Police. The matter of obtaining identity card numbers that are the same does not arise. This is because each individual is issued a unique identity number. Cases of the same identity card number only occur when the identity card has been altered. However, the government is indeed serious about the offence of possessing fake identity cards by foreign nationals. Any information or complaints received regarding this will be investigated and immediate action will be taken. That is all, thank you.
Thank you, Mr Speaker, thank you to the Deputy Minister. In the recent election, in March, an owner of an identity card numbered 480213-12-5161. When he came to vote, he was told that according to the registration, the person concerned had passed away and could not vote. The second example is a woman, the owner of a passport registered as DAF018211, a person who holds a passport and has obtained an identity card, MyKad, numbered 661230-12-5430. How can this happen when the person is the holder of a passport? So these are indeed our questions ...
Honourable Member, what passport, Honourable Member?
A foreigner's passport. So this is indeed our problem. How can we prevent foreigners from obtaining identity cards in Malaysia. Thank you.
Thank you, Honourable Member for Sepanggar. According to what was answered just now, the government did not say that foreigners could not possibly obtain MyKad. The MyKad that is in the hands of these foreigners is a MyKad that has been altered. Just now the Honourable Member mentioned two cases.
The first case concerns a citizen who has passed away. The person who went to vote was holding the MyKad of a person who had passed away. This may also be one case of forgery, physically altering the MyKad. When we go to vote during the election, the officers at the polling stations do not have readers. They only compare with the voter registers. Therefore, I believe such cases cannot remain hidden for long. Although foreigners may obtain a fake MyKad by altering the photo on the front of the identity card, the chip in the identity card cannot possibly be forged. If the chip is damaged by irresponsible persons, the National Registration Department has a database at its headquarters, where it can detect whether the person holding the MyKad is genuine or not. For example, if a foreigner holds a forged MyKad, one day it will be detected by enforcement authorities. If the Honourable Member is still confused and wishes to have additional information on this matter, especially the situation in Sabah, perhaps you could meet with us and we can discuss it together with officers so that further explanation can be given to the Honourable Member. That is all, thank you.
Thank you, Mr Speaker. My supplementary question, I would like to know from the ministry, how many people in the Silam area have applied for registration, especially those who are categorised as foreigners. What action has the government taken to address the large number, because we see how local writers assume that many fake ICs are found especially in my constituency, in the Silam parliamentary constituency. Thank you.
Thank you, Honourable Member. I believe the question the Honourable Member asked is quite specific in terms of statistics, namely how many people have applied for MyKad. I am not answering this for now because I do not have the specific information that the Honourable Member requires. In terms of MyKad applications, I believe all Honourable Members are aware that MyKad is only for Malaysian citizens, not for foreigners.
If foreigners wish to apply for MyKad, they must meet the conditions set by the government. That is all, thank you.
Honourable Members.
Mr Speaker, a short question.
Honourable Members, the questions for oral answer for this morning have now come to an end. [The time for Questions for Oral Answer has ended]
Motion to Adjourn the Meeting Under S.O. 18(1) — FDI Outflow on a Large ScaleUrgent matter
Please, Honourable Member.
Merujuk kepada Peraturan Mesyuarat 18(1) dan (2), dengan ini saya ingin mengusulkan supaya Mesyuarat ini ditangguhkan untuk membincangkan perkara tertentu, berkepentingan ramai dan perlu disegerakan. Saya Anwar bin Ibrahim mohon mencadangkan bahawa Dewan ini hendaklah ditangguhkan bagi membolehkan Dewan yang mulia ini membincangkan satu isu tentang laporan terbaru United Nation Conference on Trade and Development World Investment Report 2008 mengenai pengaliran keluar pelaburan asing atau FDI yang mencecah RM38 bilion berbanding kemasukan yang hanya RM29 bilion untuk tahun 2007 menyebabkan negara mengalami aliran bersih pelaburan langsung asing yang negatif sebanyak RM9 bilion. Mr Speaker, in the latest UNCTAD World Investment Report 2008, it was found that Malaysia, although the inflow of foreign direct investment increased to RM29 billion for 2007 compared with RM21 billion in 2006. Namun pengaliran keluar FDI secara besar-besaran mencecah RM38 bilion pada tahun 2007 menyebabkan negara mengalami aliran bersih FDI yang negatif sebanyak RM9 bilion. Fenomena pengaliran keluar FDI secara besar-besaran ini berlaku sejak 2005 dan jika berterusan, akan mengakibatkan negara terus mengalami penguncupan ekonomi, kemerosotan keluaran dalam negara kasar, pengangguran dan pengurangan peluang pekerjaan. Di samping itu, apatah lagi dalam keadaan negara berhadapan dengan krisis kewangan global. Mr Speaker, secara menyeluruh rantau ASEAN mengalami peningkatan kemasukan FDI yang begitu besar mencecah RM209 bilion untuk 2007 berbanding hanya RM116 bilion untuk tahun 2006. Ini bersamaan peningkatan sebanyak 81.9%. Walau bagaimanapun, hanya Malaysia yang mengalami pengaliran keluar FDI melebihi pengaliran masuk menyebabkan negara mengalami aliran bersih FDI yang negatif. Sekiranya fenomena ini tidak ditangani dengan segera, maka negara akan ketinggalan dalam persaingan ekonomi dan pembangunan berbanding dengan negara-negara jirannya. Alasan yang dikemukakan selama ini bahawa kononnya semua negara mengalami masalah tidak tepat kerana kita mengalami satu keadaan yang lebih parah berbanding dengan negara jiran. Atas perkara yang tertentu dan ini melibatkan kepentingan rakyat umum yang perlu disegerakan, maka saya mohon kita mengadakan suatu kerjasama semua pihak untuk membincangkan dan membantu menyelesaikan kemelut besar yang melanda negara. Terima kasih Mr Speaker.
Thank you, Honourable Member. Honourable Members, I have received a Notice of Motion under Standing Order 18(1) from the Honourable Member for Permatang Pauh on Wednesday, 19 November 2008. The text of the Motion is as read out by the Honourable Member just now. In order for this matter to be considered by the Sitting of this House today, I, as Mr Speaker, must be satisfied that the matter raised
(i) that the matter is specific; (ii) that it is of public importance; and
(iii) that it requires urgent attention. I have examined this matter and I find that it is a specific matter and that it is of public importance. However, this matter does not need to be urgently addressed. Therefore, I reject this motion under Standing Order 18(2).
Mr Speaker, I understand that decision and I do not dispute the decision. I only humbly seek Mr Speaker's discretion to allow me to record one matter because it is an urgent issue and if it is not debated and addressed now, it will lead to an even worse economic situation. All countries in the world without exception are taking immediate steps to discuss, formulate, seek consensus and reach agreement, including among the ruling and opposition parties. Therefore, I use this House to continue to request the Honourable Minister of International Trade and Industry to take this issue seriously and not merely record the inflow of money and then bury the facts about the outflow of funds. Therefore, a special session of Members of Parliament from Barisan Nasional and Pakatan Rakyat should rightly be convened to discuss this issue for the sake of the nation's economic interests and the people, especially the problems relating to unemployment and the negative economic impact. Thank you, Mr Speaker.
Thank you. For the information of Honourable Members, the issue raised here has already been explained by the Honourable Minister of International Trade and Industry (MITI) in the House on 30 October 2008, during the winding-up session of the debate on the Supply Bill 2009 at the policy stage. To answer the questions raised by the Honourable Member for Permatang Pauh, the Honourable Member for Kuala Selangor, the Honourable Member for Gombak and the Honourable Member for Selayang. The Honourable Deputy Minister also explained the same issue during the winding-up session at the Committee stage on 20 November 2008. Issues relating to FDI have also been raised before during oral question sessions by the Honourable Member for Taiping, the Honourable Member for Kuala Selangor, the Honourable Member for Bachok and the Honourable Member for Kulai. Therefore, Honourable Members, this issue has in fact already been taken up and addressed by the ministry in this House. Thank you.
Bill — Supply Bill 2009 and Development Estimates Motion 2009 CommitteeBill
The Order of Business is read to resume consideration of the "Supply Bill 2009 and Development Estimates 2009 in the Committee of Supply." [Eleventh Day] The House sits in Committee. [Deputy Speaker (Datuk Ronald Kiandee) in the Chair
The Honourable Minister of the Ministry of Entrepreneur and Cooperative Development is invited to continue the reply.
Bill — Supply Bill 2009 and Development Estimates Motion 2009 Committee — Head B.26 [Schedule] – Head P.26 [Development Estimates 2009] –Bill
Thank you, Mr Chairman. [Deputy Speaker (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar) in the Chair of the Committee] I will continue the winding-up according to the issues or fields that have been raised by Honourable Members. Last Thursday, I already touched on the LPKP as a whole. Today I continue with...
A clarification before continuing. Mr Chairman, last week I was challenged by the Honourable Minister on what, to my knowledge, is the number of types of taxis that exist in this country. The Honourable Minister mentioned three types, namely budget, premium and executive. However, I would like to correct the Honourable Minister. Is the Honourable Minister aware that the types of taxis are more than three? There are four more types of taxis that were not mentioned by the Honourable Minister. How about taxis called family taxis, limousine taxis, LCCT taxis and KLIA taxis? All of these differ from one another. This shows that the Honourable Minister not only lacks awareness but also did not do homework. It is not proper to call me lacking in knowledge of these types of taxis. Therefore, the Honourable Member must apologise to me.
Honourable Member, the opposition always asks the Minister. Last week the Minister asked the opposition whether they knew. Honourable Member, please read the Hansard. I said how many types of taxis there are in the city. Not in the country. How can you, as a Member of Parliament, come to the city if you do not even understand the types of taxis?
That is not doing homework.
He teaches, but he does not do his homeworks.
Who? I asked the question, how many types of taxis are there in the city? What is the Honourable Member talking about in this country, what is this about? Do you not know the difference between the city and the country? The Honourable Member is a representative of the people from the city. What the Honourable Member just said is not the same. No need, Honourable Member, let me continue. I have already answered. He said that until it is not finished, when it is tired he will then do democracy. That is the only work he knows. Mr Chairman, the determination of the rebranding of MARA's image. Regarding the matter that MARA should be strengthened and given additional allocation so that it can implement more effective entrepreneur development programmes...
Tuan Pengerusi...
As proposed by the Honourable Member for Pasir Mas, the Honourable Member for Hulu Terengganu ....
Let him finish first. Sit down.
The Honourable Member for Batu Pahat, the Honourable Member for Labuan and the other Honourable Members, the ministry welcomes the proposals of Honourable Members to enhance the image and elevate the standing of MARA. What about it? The surcharge issue?
Yes, that surcharge. Because the Honourable Minister promised ....
It's all right, Honourable Member, I think I already told the Honourable Member about this surcharge when I wound up the policy debate. Regarding ....
No. That day the Honourable Minister promised to give a reply.
Yes, the answer is the same. As I wound up.
May I ask for clarification? Let me through a little.
Don't... Honourable Member, please.
I made a request to the Honourable Minister to review the surcharge. At least for distances not exceeding 100 kilometres. Such as from Seremban to Kuala Lumpur. There are passengers who depend on these buses every day. If a surcharge is imposed every day, that is unfair to the passengers. So I ask the Honourable Minister's side to review at least the buses between Seremban and Kuala Lumpur. It can be reviewed, do not impose a surcharge on these passengers, that is all. I ask the Honourable Minister to please study it.
Thank you for the Honourable Member's proposal. I have already announced that we will conduct a comprehensive study of these fares. Not only express buses and stopping buses as the Honourable Member just mentioned. We will also carry out a study on taxi fares, school bus fares and minibus fares. So, pending or in the meantime while we make this announcement, we continue with this surcharge. This surcharge is 30%. We are well aware that the bus associations asked for up to 100%. At a minimum they asked for 70%. I have also announced that it is impossible for us to increase it to 70%. So for this 30%, we do not know whether we will increase it by 30% or a little more. We will see this from the overall study, because I have stated that the decision, we already know what percentage we want to increase. However, when there are incentives announced by the government in this new budget for public transport, we have to review what percentage of fare increase we need to raise. So I think I have already answered the Honourable Member the other day. The Honourable Member for Kubang Kerian too, I already answered the other day. So I think, Mr Chairman, may I continue with the new issue. Mr Chairman, in response to the proposals from Honourable Members to increase MARA's allocation, MARA has restructured its vision, direction and strategy to become an institution that is credible and outstanding not only in education but also in entrepreneur development. In the field of education, up to 2008, 40 MARA Junior Science Colleges (MRSM) are in operation and four more MRSM are expected to begin operation in 2009. Regarding the proposals of the Honourable Member for Labuan and the Honourable Member for Dungun that MRSM be developed in Labuan and Dungun, the ministry will consider this under the Tenth Malaysia Plan. The ministry also intends to build 16 more MRSM to further increase the number of MRSM to 60 by 2013, as proposed by the Honourable Member for Hulu Terengganu. For the purpose of elevating MRSM, several MRSM will be made elite MRSM as proposed by the Honourable Member for Batu Pahat, namely MRSM Taiping, MRSM Jasin, and MRSM Pengkalan Chepa.
MARA has also restructured the school curriculum to establish MRSM in the technical and religious fields. For next year's intake, for the first time we will establish MRSM in the religious field and place it in Besut, and in the technical field. In an effort to improve the academic achievement of MRSM students, as the question from the Honourable Member for Pendang, MARA has taken two approaches, namely implementing academic enhancement programmes for students with a focus on weak students, such as PL-teaching, planned revision, drill exercises and extrapolation, and implementing teacher development programmes through observation or supervision of teachers' teaching methods. Regarding the percentage of non-Bumiputera students admitted to MRSM, MARA has allocated a quota of 10% for each non-Bumiputera intake session. In addition, these student admission policies are being strengthened so as to give more opportunities to qualified rural and poor students.
Minta laluan.
Wait a moment. We are well aware that there are about 46,000 students who obtained 5A in UPSR who have bought forms to enter MRSM, and there are about 30,000 people. MRSM can only accommodate about five thousand people. For that reason, we have proposed that the intake of students to MRSM this year be increased for rural students, namely 70% for rural areas and 30% from urban areas. This is because from the results of this latest UPSR we see that students in rural areas, we found that some schools did not get any 5A at all. In Tanjong Karang, Mr Chairman, only about 69 people obtained 5A throughout the Tanjong Karang Parliamentary constituency.
[Bangun]
But in the Klang Valley, school by school we see, there is one school...
[Bangun]
More than 100 people got 5A. Eighty people got 5A. So that is why we will give this equal opportunity to students from rural areas to seize the opportunity to pursue education at the MARA Junior Science College. Regarding the proposal of the Honourable Member for Batu Pahat that clever students be produced, I would like to inform that our national astronaut, Datuk Dr. Sheikh Muszaphar, is a product of, or was produced by, the MARA Junior Science College. So we are proud that MRSM was able to produce the country's first astronaut. Yes, my friend the Honourable Member for Lenggong, please stand first.
Thank you, Honourable Minister. I agree that the ministry should continuously make efforts to maintain the quality and standards of students produced by MARA. Of course our hope from now on is not only one person who can be sent into outer space to be seen as the quality of MARA students. I would just like to ask the Honourable Minister, I also see that there was something done before where students with 4A 1B were also given places. On the grounds that they are poor, outsiders and so on. Is that going to be reviewed so that the standard and quality of excellent students, only 5A, are given the opportunity, because many students with 5A also did not get in. Thank you.
Thank you, Honourable Member. We maintain the minimum requirement of 4A 1B because we want to give opportunities to poor students. As I mentioned earlier, there are students in rural areas, perhaps in Lenggong, in the far corners there, who do not have any 5A at all. At most they get 4A. There is one school where the highest is only 3A. So if students who live in rural areas are given access to learning facilities, then from MRSM records it has been proven that even though ...
[Bangun]
These students are admitted with 4A 1B, and in the end they achieve results that are just as impressive as students admitted on the basis of 5A.
[Bangun]
However, the number that we allocate for 4A 1B is not large. We estimate only 150 people, specifically for the children of poor people in rural areas.
Honourable Member, let me continue a little. There are also poor students in rural areas who get 5A.
Honourable Member, please ask a little at a time, Honourable Member. Give the others a chance to ask, Honourable Member. Do not have a dialogue with the Minister.
Boleh?
[Bangun]
The Honourable Member for Batu Pahat.
There are more at the back, Honourable Member. The Honourable Member for Jerlun.
Thank you, Mr Chairman. I am interested and in fact I agree with what the Honourable Minister mentioned regarding admission, namely the priority given to rural students. However, I would like to know what mechanism and assurance there is that the children of rich people in the city and so on will not be given the opportunity to enter this MRSM, because there is a fear that they have good connections and so on and they can also get in. So, that assurance is actually for admission. I know the number of places is very limited, namely 5,000. So, what is the assurance to ensure that these people do not get that opportunity so that those in rural areas are given attention, and if it happens, will the offer be withdrawn? I want an explanation on this issue.
Give it to the Honourable Member for Jerlun once more. The Honourable Member for Pasir Mas first.
Thank you, Mr Chairman. I strongly agree with the Honourable Minister's answer that the 4A 1B policy should be retained, because if you ask me, I would even agree with 3A 2B. This is because, although we measure by UPSR results of 5A, most students in rural areas, if given the opportunity, can also achieve excellent success. Next, I want to ask the Honourable Minister whether there is a policy to build a Maktab Rendah Sains MARA, one Maktab Rendah Sains MARA for a parliamentary constituency that is considered rural. This is because the demand for admission to Maktab Rendah Sains MARA is so great, while the places are limited. Of the 70% set aside for these rural students, I also want to ask about the percentage for the children of police and army personnel. They too should be considered a priority, as they serve the nation through the army and police, and their salaries are not high. Therefore, their children should also be given the privilege of admission to Maktab Rendah Sains MARA. When I asked earlier whether there is a policy for every rural area, what I know is that Pasir Mas already has land. Therefore, when will the Maktab Rendah Sains MARA project in the Pasir Mas Parliamentary constituency be implemented? That is all, thank you.
Thank you, Mr Speaker. Thank you to the Honourable Minister. We are well aware that the MRSM system is a system that has been very successful in producing our children who are highly accomplished in
all fields. At the same time, we understand that the age range of 12 to 17 is the period in which we can form a good personality and character so as to produce people who are useful to society. Has MARA decided that MRSM should admit students from Form 1 to Form 5, rather than separating them into Forms 1 to 3 and Forms 4 and 5? Second, I was interested in what the Honourable Minister mentioned earlier about MRSM being based on religion. I think this is a very good idea because, as we are well aware, Islam is one of the most scientific religions. So I think the combination of science and religion is an approach that I believe can produce outstanding Bumiputera children in both aspects. Third, I have found that generally in MARA, the directors-general and deputy directors-general come from the Entrepreneur Development Division. I do not deny the contribution made by the Entrepreneur Development Division within the Ministry, but we are also well aware that the Education Division within MARA has also made many contributions that have brought honour to MARA. So, would it not be possible for the Ministry to consider giving priority to those from the Education Division for senior positions in MARA? That is all, thank you.
Thank you, Honourable Members. Firstly, the Honourable Member for Batu Pahat wants a guarantee of 70:30, but the Honourable Member says he wants to guarantee that children of the rich will not be admitted. I think we have conditions for admission. If it is said that there are 30% for urban areas, perhaps 5% or 10% may also slip through. So, the selection process is done through a computer system that has merit-based criteria. MARA also plans, in its intake next year, for Form 1, to take students by holding a second examination, not relying solely on the UPSR. In fact, we have a special examination for entry into Maktab Rendah Sains MARA because applications are so numerous. For intakes for Form 4, we plan not only to hold a one-day interview but perhaps a whole week. We want to gather those who apply so that we can look at them as a whole, not relying solely on academic achievement but also on character and co-curricular activities.
Please explain, Honourable Minister.
Wait, I want to answer these three first. Second, regarding the proposal from the Honourable Member for Pasir Mas, as I stated earlier, we now have 40 MRSM. By 2013, we want to establish up to 60, meaning another 20 will be added. However, if according to the Honourable Member's proposal we are to set up one in every parliamentary constituency, I think I cannot say yes. If it is Pusat Giat MARA, yes, we are able to build one in every parliamentary constituency. We know that to build a Pusat Giat MARA, we only need RM1 million, but building a Maktab Rendah Sains MARA requires a large allocation. Nevertheless, we will continue to give as many students as possible the chance to enter Maktab Rendah Sains MARA. Regarding the Honourable Member's proposal to set one up in Pasir Mas, it is in our budget, but as I stated earlier, its implementation will be carried out in phases. This year, as we have announced, there are six, if I am not mistaken, which we will implement next year. There are three more that we must postpone for now because the budget we received is rather limited.
Just a little, Honourable Minister. Yes, that means 20 more will be built, but I ask that, if possible, the Ministry conduct a study given the very large annual increase in the number of students. So, in the Tenth Malaysia Plan, consideration should be given to establishing Maktab Rendah Sains MARA in rural areas where, by Parliamentary constituency, the Bumiputera voters are not less than 70% to 80%, and for each school, the maximum is 1,000 students. So, I believe the government can consider it. If the Honourable Minister fights for the allocation, we will also give our unwavering support. That is all, thank you.
Thank you, your view will be considered, but let us implement the 60 first by 2013. Third, Honourable Member for Jerlun, thank you very much. This Honourable Member has local standing because he is a product of Maktab Rendah Sains MARA and also Chairman of ANSARA. In this House there are two products of MRSM who will contest the Youth Chief position. One is the Honourable Member for Jerlun, and the other is the Honourable Member for Muar, who is contesting at the Deputy Chief level. So, MRSM has succeeded in producing students who have leadership qualities to become leaders in the future. Regarding the Honourable Member's proposal for intake into Form 1 and Form 3, for Form 1 intake we will continue.
That is why I said earlier, we only take 5,000 for now. This is possible because we have built a new MRSM in Bentong, and we have already obtained it. So, we will continue this system. If we wanted to take all Form 1 students, we would fear there would not be enough places. So, we give the opportunity to Form 1 students and also to school leavers from Form 3, namely those who have passed the PMR. So, for now, we have not changed this policy; we are only increasing the number of students entering Form 1. Regarding the Honourable Member's proposal about the opportunities for DG grade officers, namely groups of teachers, to hold important positions in MARA, we understand that at one time, teachers did hold the position of Director-General of MARA, but after that, many were ordinary administrators. That is why this proposal has been taken into consideration, and I have also asked MARA to give greater opportunities to these DG grade groups, namely among teachers, to be given the chance to hold important positions at headquarters level. So, in our future considerations, if there are important vacancies in several administrative divisions, we will give priority to the DG grade.
Mohon penjelasan.
Honourable Member, I must remind you. Please sit down, Honourable Member, I want to say a little. Just a little. We have debated for 11 days, but we have only finished nine ministries; 18 ministries remain, and we have only eight days left. So, if there are detailed questions that can be raised about a ministry, please go and meet the minister. I apologise, Honourable Member, I am responsible to Parliament for completing the questions for these ministries. We only have seven or eight days left, including today. Please, the earlier one, Honourable Member, you may give.
Just a little. Honourable Minister.
If I have to give to the Honourable Member, I will give to the one at the back first.
[Bangun]
[Bangun]
The question from the people of Sungai Batu and the question from the people of Sungai Batu.
The Honourable Member for Silam.
Thank you, Mr Chairman. Honourable Minister, I know that MRSM's role is very good and it has succeeded in producing many human capital who are the pride of every Malaysian citizen. I would like to request an explanation from the Honourable Minister because we see, in terms of admission of MRSM students for the states of Sabah and Sarawak, given that we know the ethnic backgrounds differ, especially in the states of Sabah and Sarawak. I would ask that we get an explanation regarding the ratio and the rules so that they can be taken seriously by the Ministry, because we do not want the students who will study at MRSM to be imbalanced in ethnic terms in the state of Sabah. Secondly, I also hope that, regarding the subjects taught at MRSM in the state of Sabah, especially, we hope that the racial sensitivities that exist in the state of Sabah can be taken into account, because we do not want to undermine the good relations among the communities in the state of Sabah itself. I would also like to know whether, in the Silam Parliamentary constituency, the Ministry plans to establish this MRSM, and if there is, I would very much welcome it, because we see that in terms of Parliamentary constituencies in rural areas in Sabah, MRSM is still considered new. We hope the Ministry will take care in this matter, because we see that there is still a large rural population in the state of Sabah. I very much hope that the Ministry will take this matter into account for the common good so that the development of education can be implemented comprehensively. Thank you, Honourable Minister.
Thank you, Mr Chairman, thank you, Honourable Minister. Earlier, I heard the policy on admitting students from Form 1. In my view, Form 1 students are in early adolescence, and they feel they still need family life so that family culture, parental affection and so on at home can be maintained. So, what is the Honourable Minister's view on changing this policy so that admission begins from Form 4 onwards, because Form 4 students are usually already teenagers, somewhat more mature, and more focused on learning and so on compared with Form 1. Secondly, I congratulate the Honourable Minister for giving room to the DG grade group to obtain important positions also in management, at headquarters and so on. Is there a policy in MRSM like that of the Ministry of Education Malaysia (KPM), where perhaps there are groups of teachers in MRSM who are not interested in administrative posts but continue teaching, using their teaching expertise, and eventually can rise from perhaps DG41 to JUSA C through promotion as teachers, not by changing to administrators. The same applies at the level of school management and college management. Is there or is there not a policy that allows outstanding principals to be promoted directly to JUSA C as school principals or school administrators, instead of us transferring them to headquarters and so on, and losing the expertise among these teachers and school administrators? Please explain.
Thank you, Honourable Minister, for granting permission. I ask for an explanation because I am confident that the presence of Maktab Rendah Sains MARA has an impact on the local area. My question is, to what extent does the Minister give, or whether that matter is not a policy, so that the advantage goes to local students?
Is it not a policy so that the advantage goes to local students? For example, in Balik Pulau, is admission given, or are there certain percentages for local students, because I think that will have a long-term impact for the local residents. Furthermore, to what extent does the Minister see that MARA itself, although among its students there are Malay Bumiputera, the outlook that will be formed tomorrow is students who are not only strongly Malay-minded but also have a high sense of Malaysian civilisation. Are subjects such as Chinese culture, Chinese language or languages other than Malay also instilled in the syllabus so that what is formed is a spirit that understands the framework of the Malaysian nation. Thank you.
Thank you, Honourable Member...
Honourable Minister, how much longer is the Honourable Minister's estimate?
If there is no disruption, about one hour; if people disrupt, two hours.
Honourable Member, I ask you, Honourable Member. Looking at our timetable, I think we cannot finish, Honourable Member. So, if there are new matters, do not raise them again, do not even answer them. You may answer in writing, Honourable Member.
Okay. Thank you, Honourable Member, thank you, Mr Chairman. The Honourable Member for Silam earlier, we will give the Maktab Rendah Sains MARA in Sabah, we will reserve it for the children of Sabah. Then, construction in Silam is indeed not in the plan. So, if there is an allocation, we can propose to include it in the Tenth Malaysia Plan. Regarding the proposal from the Honourable Member for Lipis, I very much understand what the Honourable Member means, firstly, teachers are the same as KPM teachers. That means if KPM has outstanding teachers, MRSM also has provision for outstanding teacher posts. Regarding Form 1 intake, we are somewhat different from the proposal of the Honourable Member for Jerlun, we will consider it because we must give opportunities to Form 1 students, since when they enter secondary school, the situation is usually quite different. If originally they are taken from Form 1, then we will continue this policy. Next, the Honourable Member for Balik Pulau, we indeed give priority to local students, but at the same time we also receive applications where local people do not want to stay in their own place and ask for MRSM too. So, we will take all these views of the Honourable Members into account.
Regarding the International Baccalaureate (IB) programme, as raised by the Honourable Member for Jempol, MARA is currently implementing this programme at Kolej Mara Bakti and Kolej Mara Seremban. So far, a total of 837 students have followed this programme at both of these education centres. Meanwhile, MARA also plans to develop an international-standard education centre in Iskandar Region, Johor, so that international students can pursue education in Malaysia. This effort is in line with the proposal of the Honourable Member from Jempol to allow the admission of international students at Kolej Mara Banting. At the same time, MARA will also...
Honourable Minister, that is the reverse. I do not agree that it should be opened to international students. This is because even without the involvement of international students, Kolej Mara Banting has become the best IB college in the world in terms of results. So, if we bring international students in there,
it will block the opportunities for students within the country to study there with many more people. So the officer's answer is the reverse.
The Honourable Member proposed that the Banting branch be kept as it is. However, what we want to propose is that when we open another branch of ours in the Iskandar Region, we will open it to international students, while at the same time the quota or number of places that we have given to our people, namely the bumiputera, will not be affected. This is so that our students can compete further with students at the international level. At the same time, MARA will also run a programme for outstanding students to send these outstanding students to top-ten universities across the world. That is why today we are exploring, not only sending medical students. For example, not only in countries that have long been famous in the field of medicine, but also in new countries such as Romania, where we see that one of its universities is 150 years old and has very good medical education facilities. So MARA will explore and will send MARA students to Romania starting next year. Mr Chairman, in strengthening and rebranding entrepreneurial development programmes as a core strategy of MARA, in an effort to produce a trading community from bumiputera entrepreneurs, five main programmes have been implemented by MARA, namely the retail landscape, the techno-entrepreneur landscape, the conversion landscape, the vendor landscape and the IBS or hardware landscape. To date, through RMK-9, MARA has produced as many as 25,080 entrepreneurs, involving an allocation of RM145.7 million. For this purpose too, the ministry welcomes the proposal of the Honourable Member from Pasir Mas that MARA Incorporated be set up to develop entrepreneurs through direct selling. MARA is now drafting a new entrepreneurial development strategy by providing facilities, and not only to strengthen its business premises in rural areas but also to provide business premises in shopping centres in major towns. In this connection, MARA has changed its business concept, such as making MARA's business premises into digital hubs and a women's paradise at Anggerik Mall, Shah Alam. Apart from that, MARA has also drafted an entrepreneurial development strategy through promotion and marketing overseas to penetrate wider markets, such as in China and the Middle East, as well as connecting business networks between entrepreneurs in Malaysia, both at home and abroad. Besides that, MARA's focus is also more concentrated on developing entrepreneurs in new fields such as aerospace, ICT, automotive, biotechnology and also services. Regarding the proposal of the Honourable Member for Baling that the concept of halal teaching be taught by Maktab Sains Rendah Mara, Baling, I would like to inform the Honourable Member that MARA has in fact already set up the Institute of Food Technology in Kepong in developing the halal industry in this country, and in IKM Lenggong, which we will implement, we will also introduce this halal food industry. I also thank the Honourable Member for knowing how to express gratitude to the government that built MRSM in Baling. So, people with knowledge are a little different from people without knowledge. He knows how to say thank you. Thank you, Honourable Member. [House in uproar] If all the opposition were like the Honourable Member for Baling, it would be easy for us to do our work. Meanwhile, in strengthening the management and administration of MARA, as proposed by the Honourable Member for Hulu Terengganu to increase the number of MARA officers, MARA has taken action to increase the number of officers...
The Honourable Minister.
Already praising him, yet still want to stand up?
Ada ilmu.
Just a little. [Laughter]
I thought he had already praised, and he would not stand up, Mr Chairman. But he is standing up anyway.
Can, can I have a little, Honourable Minister?
Ya.
Thank you, Honourable Minister, for the answer given. Only, earlier I was speaking about the halal hub, without denying the efforts that have been and are being made by the ministry. I only perhaps want to ask for greater emphasis, namely these courses or this emphasis, so that we give a capacity to the future, so that students or graduates from here are able to qualify themselves in the position I meant as SIRIM or the standards just now, so that they have expertise and skills. Likewise, later we should have a place for the ministry or the country, a place to receive views and advice to determine whether this halal hub can be adopted or not. I also propose to the ministry regarding ISI. In administration and management, we have ISO standards. However, because we see now that ISI has been around for so long, and coincidentally I was involved at the early stage in drafting the constitution for the Persatuan Pengguna Islam Malaysia, I think ISI, it would be good for the government to give backing to the Persatuan Pengguna Islam so that it can go straight ahead, so that ISI can be marketed in other languages. That means it can be taken to other Islamic countries. So this situation can expand further and be more convincing not only to Muslims in our country but also elsewhere.
Thank you for the views of the Honourable Member. We cannot deny that with the existence of the halal hub or halal food, its market is indeed very wide. That is why the government takes this seriously, and we have set up the Halal Hub Corporation to monitor it. At the same time, MARA will also give priority every time we hold courses, and for any goods and products that we take abroad, we ensure they are halal products. As for the proposal of the Honourable Member regarding ISI, to be founded by the Persatuan Pengguna Islam, God willing, next week I have a meeting together with the Islamic affairs committee. If the Honourable Member wishes to come, there is no problem. The Honourable Member may come to give views in a more closed setting. Mr Chairman, in conclusion, in strengthening and rebranding MARA, the ministry welcomes the proposal of the Honourable Members that MARA's allocation be increased. In this regard, the ministry will apply for consideration from the government on this matter. The next issue, Mr Chairman, is the development of Giat MARA. Regarding the development of Giat MARA, as an institution that provides skills training at the grassroots level, the ministry welcomes the proposal that the allocation for Giat MARA be increased, as proposed by the Honourable Members for Pasir Mas, Lenggong, Labuan and Batang Sadong. For the information of the Honourable Members, to date a total of 206 Giat MARA have been developed throughout the country. The ministry is targeting that one Giat MARA for every Parliament can be established by the end of RMK-10. For now, the allocation approved for one Giat MARA is RM1 million for each Giat MARA. Due to this limited allocation, MARA has had to set up Giat MARA by occupying unused buildings such as old police stations, penghulu offices and others, as well as renting commercial space in designated areas. Regarding the proposal of the Honourable Member for Pasir Mas that the existing dilapidated Giat MARA Pasir Mas be replaced, MARA is aware of this situation and has bought land measuring 9.2 acres for this purpose, and development of Giat MARA in Pasir Mas will be started after the name change process is complete. As for upgrading Giat MARA Labuan as proposed by the Honourable
Labuan, MARA has carried out maintenance on the old hall and plans to add a new building at that Giat MARA in 2009. Regarding the proposal for the construction of a new Giat MARA in rural Simunjan by the Honourable Member for Batang Sadong, MARA has looked at the proposed area and is preparing a working paper for this purpose.
I would also like to inform the Honourable Members that if the existing Giat MARA is insufficient, then the ministry has no objection if any of the Honourable Members wish to propose opening a branch of the existing Giat MARA, provided a building or place is available. MARA will provide support, and we will open these branches in each Parliamentary constituency, if in Parliamentary constituencies such as in Sabah and Sarawak, which are very large. I am pleased to draw the attention of the Honourable Members to the performance of Giat MARA as raised by the Honourable Member for Lenggong. To date, Giat MARA has trained as many as 178,190 trainees, of whom 80% of this total have found work with the private sector or SMEs, 13% have become entrepreneurs, 5% have continued their studies at higher levels, and the remaining 2% are still looking for work. In creating more technical entrepreneurs, Giat MARA trainees are now encouraged to become entrepreneurs, as proposed by the Honourable Member from Jempol. Several approaches have been implemented by Giat MARA for this purpose, such as incorporating entrepreneurship knowledge into learning modules and implementing technical entrepreneur programmes, or PUTEK, with an incubator concept. In addition, to increase the number of skill fields or new technologies at Giat MARA, as proposed by the Honourable Member for Kinabatangan, Giat MARA has now sent its teaching staff to learn the latest skills or technologies. This is done to ensure that the skill fields obtained at Giat MARA can meet the needs of industry. To promote the opportunities provided by Giat MARA at the grassroots level, as proposed by the Honourable Member for Arau, especially in schools, Giat MARA has implemented several approaches, namely giving flyers to schools, giving talks on the courses offered and careers, holding publicity in the mass media, sending letters to heads of departments in the districts, and organising the Giat MARA with the People programme. Regarding the admission of youths from southern Thailand to Giat MARA, this is a Malaysian commitment under the bilateral relationship between Malaysia and Thailand, and under this commitment, the instructors also obtain the latest technology
[Bangun]
... from the Thai side, which Malaysia does not have. For the information of the Honourable Member for Arau, this admission...
Tuan Pengerusi.
... does not affect the existing quota in our country. Giat MARA, is it?
Yes, Giat MARA.
Let me finish on Giat MARA, just a little more. I would like to inform this august House that Giat MARA has now been given the responsibility of providing skills training not only to youths who have dropped out and are unemployed, but also focusing on the poor in every Parliamentary constituency under the Giat MARA Income-Generating Training Programme. After they have received this skills training, they will be given equipment and machines free of charge to enable them to start
a business at home first. After the business receives a good response and good market demand, its scale will be expanded, where agencies under the ministry, such as TEKUN and MARA, will provide financing facilities. Up to June 2008, as many as 3,224 poor people have benefited from this through 124 packaged training programmes involving expenditure totalling RM10.47 million. Yes.
Thank you, Mr Chairman, thank you, Honourable Minister. I find that Giat MARA holds innovation competitions every year, and I find that some of the inventions by these trainees are truly amazing and very good. So I want to know to what extent the ministry is making efforts to commercialise the results of these inventions, and if there are any, what evidence there is. That is all, thank you.
Thank you, Honourable Member. Your views have indeed already been discussed by MARA's management. We have indeed seen that recently Giat MARA has won many competitions at the international level, and that is why we have proposed that these inventions must be commercialised. Not merely winning, receiving a trophy and keeping it. We have asked for cooperation from DIDAC to realise what the Honourable Member has just stated.
[Bangun]
Mr Chairman, regarding the financing programme or system that has been widely disputed by the Honourable Members...
Giat MARA, Honourable Member.
Giat MARA again? That's the end of it.
I was intrigued by a report I read that the minister, Mr Chairman, had carried out a pilot project to produce careful drivers from heavy vehicle drivers and bus drivers, and this pilot project was held in Mergong, Kedah. So it was stated here that this pilot project will be looked at, and if there are results it will be expanded. So I want to know a little about what results have been achieved at Giat MARA Mergong, whether they have yielded results to be expanded to other places. That is all, thank you.
Thank you. Because this course is new, I dare not say whether it is successful or not, but God willing we have received support from bus and taxi associations to produce careful drivers, and we have also received offers from several parties that run driving schools to collaborate with them. Mr Chairman, regarding the subsidiary system or this financing programme, which has been raised by the Honourable Members about how difficult it is to obtain financing through financing agencies such as MARA, SME Bank and TEKUN, as raised by the Honourable Member for Batu Pahat, the Honourable Member for Hulu Terengganu, the Honourable Member for Labuan, the Honourable Member for Batang Sadong and also the Honourable Member for Pasir Salak. The ministry has always been concerned about this matter and has taken various steps. Among them are: (i) setting up an appeals committee and a committee for easy financing at ministry level to reconsider failed loan applications; (ii) we have directed that every rejected application must be given reasons and grounds why the application was rejected, so that it is easy for the people to appeal to a higher level;
(iii) holding a second-chance loan scheme and also rehabilitation; (iv) decentralising powers at the grassroots level, such as in the case of TEKUN, where for loans of RM10,000 and below, only TEKUN district officers can approve the application, and for MARA we have decentralised RM20,000 to MARA district officers to make decisions so that the people do not have to wait anxiously on whether their applications are approved or not; (v) setting up a flying squad to monitor agencies on the ministry's instructions in providing financing, where if we receive information from any party, we will go down ourselves or we will call the complainant and the agency concerned to present to us so that we can study and find out why these problems can arise, even though we have directed new policies to provide assistance to borrowers; and (vi) we have held courses to enhance the personal integrity of officers so that they have a helpful attitude to ensure that the delivery system of the financing agencies is more entrepreneur-friendly. Regarding the issue raised by the Honourable Member for Labuan, that entrepreneurs in the sea transport sector be given financing facilities, the ministry through SME Bank can consider this financing but only limited to small and medium-sized sea transport. For large-scale shipping entrepreneurs, loans can be obtained through the Development Bank under the Ministry of Finance (Kementerian Kewangan). Regarding the matter raised by the Honourable Member for Batang Sadong that the short loan repayment period be reviewed, the ministry has indeed extended this period up to 10 years, depending on cash flow projections. In addition, entrepreneurs are also given a grace period of between six to 12 months before starting repayment. Regarding the number of successful entrepreneurs under MARA's financing programme in Batang Sadong, to date as many as 1,223 entrepreneurs have succeeded in the Groom Big Financing Programme, having obtained loans more than once since 2006. Next, the Honourable Member for Silam raised the number of loans given by TEKUN in the Silam Parliament.
For the information of the Honourable Member, up to October 2008, a total of 570 entrepreneurs have received financing loans in the Silam Parliament, involving loans totalling RM2.74 million. To strengthen the delivery system and outreach, TEKUN has now set up business centres as one-stop centres for entrepreneurs to obtain information not only about TEKUN but also about the ministry, in major towns, namely at Plaza Wawasan, Kota Kinabalu, Tasek Gelugor, Penang, and Bandar Tasek Selatan in Kuala Lumpur. Apart from that, mobile van services will also be set up by TEKUN to ensure that the facilities provided can be offered to entrepreneurs with a field-visit strategy. Regarding the allegation of the Honourable Member for Baling that the number of UMNO member numbers is needed in TEKUN applications, this is untrue. If the Honourable Member has any complaints about this matter, please inform me. All we ask is for support from Members of Parliament, community leaders or the Chairmen of MPUD.
Regarding the proposal by the Honourable Member for Lenggong on the need to place TEKUN in branch offices, TEKUN is of the view that the existing number of staff at this district office is adequate for the loans provided. On the issue of TEKUN branch offices operating in UMNO-owned buildings, which was raised by the Honourable Members for Pendang and Titiwangsa, there was a point about TEKUN using UMNO offices. I wish to affirm here that TEKUN offices were rented in UMNO buildings because the rent in those buildings is in some cases provided free of charge, with only electricity and water to be paid. To date, there are 60 TEKUN branch offices operating in UMNO-owned buildings out of 192 branches nationwide.
A quick question. Thank you, Mr Chairman, I would like to ask a question. Just now, the Honourable Minister said that if there were cases where officers or staff asked for an UMNO form to be filled in first in order to be reported, can we be given a number to call to make things easier? Second, if the Honourable Minister said just now that the rent provided by UMNO offices is cheap or perhaps free, would the Honourable Minister consider that if we have the PAS headquarters, we could provide free rent, and free electricity and water as well? Could a TEKUN office be set up at the Markas PAS that we offer? Thank you.
Thank you, Honourable Member. As for being asked to become a UMNO member, if there is such a case, the Honourable Member may write a letter. State the name, who it is and so on, so that we can take action. Complaints made in black and white are easier for us to act on, and we can refer them back to the Honourable Member. However, as for TEKUN offices, I have stated that the existence of TEKUN offices is something we set up in every parliamentary constituency. So, as in my own parliamentary constituency, it is not in an UMNO office but in Tanjung Karang. We rent the Tabung Haji building. However, when the Honourable Member says he wants to use the PAS headquarters, I do not know in which parliamentary constituency PAS has a building. If there is one, it would be at the PAS headquarters, but that is in the Gombak parliamentary constituency. In the Gombak parliamentary constituency, we would use the existing buildings. So, what this means is that if there are no more of these offices in the parliamentary constituencies, then we can consider it. However, the many buildings available are UMNO's; PAS only has its headquarters, but I do not know about buildings. As far as I know, there is no single building that is that large, which is why we use UMNO buildings. On cooperatives. As the Honourable Members are well aware, cooperatives are a socio-economic entity. Cooperatives exist to help their members either to reduce costs, to improve marketing or to create business opportunities for cooperative members. Cooperatives operate independently and are managed democratically to benefit their members. Although the allocation for cooperative development is small, namely only RM10.9 million for the Malaysia Cooperative Commission (SKM) and RM2.6 million for the Malaysian Cooperative College (MKM), this amount can be financed by the cooperative movement itself. This is through the cooperatives' own financial allocation, namely through cooperative contributions of 2% to the Cooperative Education Trust Fund (Kumpulan Wang Amanah Pendidikan Koperasi) and 1% to the Cooperative Development Trust Fund (Wang Amanah Pembangunan Koperasi). In addition, the Cabinet has now decided to finance the emoluments and salaries of MKM staff, whose emoluments have so far been paid using contributions from the cooperative fund I mentioned earlier. With that decision, we are confident that the programmes to develop cooperatives can be enhanced. Besides this, cooperatives also have their own capital. The capital that the cooperative movement has been able to raise amounts to RM8.1 billion and assets worth RM49.7 billion. Indeed, if a larger allocation is given, I believe more cooperative development can be carried out. The Ministry welcomes the support of the Honourable Members for Rompin and Kota Melaka so that cooperatives are mobilised to develop
housing for the people, whether through the development of flats, terrace houses, bungalows and so on. If state governments can give land or sell land at a low price to cooperatives, the construction cost will be lower and the selling price will also be low. For the information of the Honourable Member, the incentive provided by the government at present is only a loan at a low rate of 6%, with a maximum loan of RM10 million to any cooperative wishing to undertake development. Regarding the proposal by the Honourable Member for Tenggara that more assistance be given to the poor, including OKU and single mothers. The Ministry, through SKM, has allocated RM10.9 million for the year 2009, which has taken into account the need for assistance for the poor, OKU and single mothers. OKU cooperatives, single mother cooperatives and cooperatives of the poor are eligible and may apply for this allocation. On the issue raised by the Honourable Member for Telok Intan regarding cooperatives failing to give dividends even though they have been operating for a long time. I would like to remind here that cooperatives are not government entities. They are like a company, except that they are established under the Cooperatives Act, they manage themselves with capital and assets influenced by the cooperative. They have a board of cooperative directors, a board of cooperative enforcement officers, and they appoint their own chairman, treasurer and secretary. Large cooperatives have their own professional management team. So, it is up to the discretion and wisdom of the cooperative board and management to engage in business. Like other private companies, cooperatives that work hard and innovate will make profits and can give high bonuses and dividends to their members. For the information of the Honourable Members, as of October 2008, a total of 177 cooperatives have declared dividends exceeding 10%.
[Bangun]
This shows that cooperatives can succeed if they are matched to the right type of business and if the board of directors is dedicated in managing their cooperatives. Next, the Honourable Members for Arau and Hulu Langat raised the status of the establishment of the Koperasi Bela Rakyat, or Kobera. To date, 17 cooperatives have been registered by us and 90 more are in the registration process. These efforts will be enhanced after obtaining approval from the Cabinet and also from the ministry and other Honourable Members. As for the proposal by the Honourable Member for Kota Melaka that cooperatives be involved in retail. This field is highly competitive because giant companies are also in this field, such as Giant, Tesco, Carrefour and so on. Nevertheless, the Ministry is trying to set up several cooperatives in this field so that cooperatives can increase product output and provide services for local products. Two cooperatives are currently being planned to be set up to establish hypermarkets, one at Jalan Gurney, which is the building raised by the Honourable Member for Titiwangsa, if I am not mistaken, which is said to still not be operating. I have been informed that the building still does not have a CF, Honourable Member. That one we will make into a cooperative.
It has been three years already.
Ya?
Honourable Member for Jasin, please stand first, Honourable Member.
Wait a moment, let me finish this first. The other one is at Pekan Francais Skudai.
For Sabah and Sarawak, efforts are also being actively made to consolidate the chains of sundry shops there. Cooperative groupings in the supermarket sector that function as distribution centres for sundry goods to cooperatives will be implemented, and we have also implemented this in Penang. Okay, please, Honourable Member for Jasin.
Thank you, Mr Chairman, thank you, Honourable Minister. One of the objectives of the Malaysia Cooperative Commission (SKM) is to ensure that all cooperatives are regulated on an ongoing basis and to give the public confidence in the cooperative movement. However, there is something I have found, Honourable Minister, that these cooperatives are charging high interest, up to 10% a year. In addition, they impose various other fees so that borrowers are left with only 81%. This is really burdensome for borrowers, and most of them are government employees. So I feel this has deviated from the original principle on which cooperatives were established. I would like your view on this.
[Bangun]
Thank you, Honourable Member. We are indeed aware that this happens. It happens because these cooperatives borrow money from finance companies and then lend that money to their members. In fact, this kind of concept goes against the Cooperatives Act itself, and we have already given advice to cooperatives carrying out activities that do not benefit their members. This is because their members should benefit, and loans must be given to existing members. However, we understand that there are cooperatives that recruit members by offering certain loans. I think I want to finish. Let me finish on cooperatives first; then the Honourable Member may stand. Perhaps whatever the Honourable Member wants to say, I will say this now.
Actually, Honourable Minister, most of our cooperatives do not take loans from banks but are self-generating. So they should not impose interest and such burdensome fees. Thank you.
Thank you, Mr Chairman. I just want to ask the Honourable Minister about the concept of matching cooperatives with corporations or other entrepreneurs that had previously been planned at the former Ministry of Entrepreneur and Cooperative Development. What is the status of this? Thank you.
Thank you, Honourable Member. We indeed give encouragement for cooperatives to carry out their economic activities just like the private sector. This is because the Honourable Member is also aware that the contribution of cooperatives in our country at present is very low, only 1% to GDP. If we compare with other countries, cooperatives can contribute up to 10%. Therefore, through the Cooperative Consultative Council at national level and at state level, whose members also consist of local entrepreneurs, we often discuss the best way to help cooperatives, and one of the ways is that we must separate the work of the board of directors from management work. Management must be carried out professionally. Therefore, we offer to any cooperative that wishes to take on our students who have been trained to obtain a cooperative diploma at the Malaysian Cooperative College. In addition, we attach them to these cooperatives, and when we have enough holders of cooperative diplomas and also degrees, we have signed an MoU with Universiti Utara Malaysia. I believe that one day cooperatives will be managed like other companies, where the board of directors is separate and management is run professionally. Unlike today, we are aware that there are cooperatives that still mix up the duties of the board of directors with the duties of cooperative management. Mr Chairman, regarding the proposal by the Honourable Member for Arau that a cooperative consortium be established, the Ministry welcomes that proposal. For the information
Honourable Member, this effort is being carried out. Only we do not call it a consortium but a Intermediate Cooperative, which is a cooperative formed from the merger of several primary cooperatives. To date, 65 intermediate-level cooperatives or consolidated cooperatives have been established. The formation of consolidated cooperatives is a strategy used by the Malaysia Cooperative Commission so that cooperatives become larger and are thus able to control the value chain of a business. For this purpose, the government also provides business development encouragement to cooperatives through exposure to business opportunities through business corporations or business matching, value chains, grow big and so on. Regarding the issue raised by the Honourable Member for Silam about cooperatives being registered late, taking as long as two years. It is true that this happened, but after we investigated, we found that the problem arose because the cooperative could not increase its capital as previously required, namely that it could be registered if it had capital of RM20,000. This cooperative had only collected capital of RM100. The cooperative was also given a period of six months to submit registration documents but failed to do so. Many people have believed in the ability of cooperatives to help them, so much so that recently we have found that cooperatives have been misused. Some use the name of a cooperative in order to attract the public. We have found that there are four cooperatives that use the name of a cooperative but in fact are not cooperatives, and these "cooperatives" have succeeded in collecting large funds, and now we are taking legal action in cooperation with Bank Rakyat. At the same time, we also find that certain cooperatives, about eight cooperatives, are under investigation, where they are misusing cooperatives by introducing their cooperatives under a get-rich-quick scheme, which clearly contravenes the Cooperatives Commission Act. Mr Chairman, regarding entrepreneur development. For the information of the Honourable Members, the Ministry's approach to developing entrepreneurs begins with providing loans through TEKUN, with RM50,000, and once they have succeeded as small entrepreneurs. For example, to set up a stall, these entrepreneurs can borrow from MARA if from the stall they want to open a restaurant, where MARA can give loans of up to RM500,000. If these entrepreneurs have succeeded as restaurant entrepreneurs and want to open a bigger hotel, these entrepreneurs are then given the opportunity to borrow under the SME Bank, where the SME Bank can give a maximum loan of RM50 million. So, that is how we create entrepreneurs. From TEKUN's RM50,000, to MARA's RM500,000, and finally SME can give loans of up to RM50 million. Meanwhile, to strengthen the capacity of existing enterprises, various programmes are being implemented by the Ministry through grow big. Promotion domestically and overseas, introduction through mass media, establishment of agents and also marketing centres. Regarding the suggestion by the Honourable Member for Titiwangsa that the Ministry reduce ...
I beg the Honourable Member's leave.
Just a moment, Honourable Member. Let me finish a little more, I am almost done. Regarding the suggestion by the Honourable Member for Titiwangsa that the Ministry reduce the development of junk food products. MECD, through the programme for improving the quality of food and beverage products, or better known as the grow big programme, is only involved in the development of aspects of improvement and quality assurance. Yes, Honourable Member.
Thank you, Honourable Member, Mr Chairman, thank you to the Honourable Minister. We know that the main problem always faced by these entrepreneurs is the market. A very limited market, so much so that sometimes they have to depend solely on the market from the government sector. This is because it is difficult for them to penetrate foreign markets and markets from other races in the free market that exists at
today. So my question to the Honourable Minister is, what efforts does the government have to help these entrepreneurs in creating a secure market for the products they produce, including penetrating international hypermarkets such as Carrefour and also Tesco. Thank you, Honourable Minister.
There is a connection, Honourable Member, there is a connection, by your leave. I would like to congratulate the Honourable Minister because the SDSI held in Melaka this year received an extremely tremendous response. But what I want to propose is that the products of these quality entrepreneurs can in fact only be marketed through retail sales, and I have been informed that their sales this year have multiplied compared with 2007. I want to congratulate them. I would like to propose that at this time, if possible, the Ministry should work together with other ministries such as MITI through MATRADE so that we can invite quality buyers from abroad to witness together the products we exhibit that have quality that we can market overseas. We do not want to just talk, saying our products are great domestically, when in fact our products have potential to be marketed overseas. Thank you.
Thank you, to the Honourable Members from Tenggara and Jasin for their sound views. This is the problem we face. I have always said that if we ask producers in the rural areas, in the many villages, most of them complain. They say there is no market to sell their products. But if we hold dialogue with entrepreneurs at the international level, they in turn complain that they cannot get the products they want. This means that at the international level there is still a shortage of these goods. Products from Malaysia, especially halal products, while in the rural areas the village folk complain that they have no market. So there is a gap here, between the basic producers and the exporters. That is why the measures we implement are, first, we will increase the number of collection centres in rural areas, in the districts, in the hope that production in every district can supply or sell their goods at the collection centres, the collection centres in every district. At the state level too we plan to set up these collection centres in every state and even at the national level. So far we have already tried to establish four places in Penang, Kedah, Terengganu, if I am not mistaken, to serve as collection centres. At the same time we are also trying to set up trading houses overseas, such as those we have started in Dublin and then in Dubai and China, so that the goods we collect at the collection centres in every state can be sent directly to our trading houses overseas. So the efforts made by the Ministry of International Trade and Industry (MITI) seem to have succeeded in promoting our goods, but when people want our goods, we find it difficult to supply them. That is why we hold the SUDSI exhibition every year in Melaka, and as an initial step, the ministry has agreed to purchase 22 lots of buildings near the Melaka Trade Centre, and we want to make this exhibition hall a permanent exhibition, because until now, when we held exhibitions, every state and every country had its products. As soon as the exhibition ended, each one took back their goods and waited another year before we met again. So once we have these buildings, we will give them to every state, and we propose that whatever products are produced by every district should be kept permanently in the buildings we have bought, and our hope is that there it will become a centre for business matching meetings between local producers and also exporters for goods to be sent overseas. Mr Chairman, the Honourable Batang Sadong raised the issue of the status of the marketing cooperation for entrepreneurs' products with GLCs, especially at KLIA. For the information of the Honourable
Members, the ministry and Malaysia Airport Bhd - MAB have cooperated to provide opportunities for entrepreneurs to do business at KLIA and also at LCCT. With regard to the Honourable Member's proposal to set up a KIOSK at the district MARA offices to help small entrepreneurs obtain information and prepare accounts, MARA has already established the Business Community Centre, or bizcom, as a centre for business solutions that provides the information sources needed by entrepreneurs, as well as information on business opportunities through software installed at the bizcom centres. Under the Ninth Malaysia Plan (RMK-9), MARA plans to set up a total of 120 bizcom centres throughout the country. In addition, the ministry has also established entrepreneur guidance centres at national, state and district levels to help entrepreneurs obtain advisory services on entrepreneurship, and the ministry will also continue the entrepreneur outreach efforts that we are carrying out in every district to promote the activities of the Ministry of Entrepreneur and Cooperative Development. Mr Chairman, regarding franchise development, the franchise approach is a strategic approach of the ministry, and the effort is not only to develop more bumiputera entrepreneurs but also to strengthen the capacity of existing entrepreneurs in that direction. Through RMK-9, the ministry targets developing 50 franchisors and 1,000 new franchisees. The ministry, through National Corporation Berhad, has adopted several strategic approaches to attract bumiputera interest in engaging in the franchise business. With regard to the question raised by the Honourable Batu Pahat on several applications to become franchisors in the food sector that were not approved, the ministry, which acts as the registrar of franchise businesses, has also taken action to protect franchisees and ensure maximum checks and assessments are carried out on applications for franchisor registration. For applications from companies that show losses over a period of three years and unfavourable cash flow, these applications will be rejected. For the information of the Honourable Members, as of October 2008, a total of 652 applications to become franchisors have been received by the ministry, and 510 franchise systems have been approved for registration under the Franchise Act 1998.
A brief clarification. Just a little. Earlier I read in an Utusan report, a statement by Francorp Malaysia Bhd saying that the cause was two months without approval, bureaucracy, and thirdly they said their applications were often modified by the relevant parties, and this has caused their current interest in registering as franchisors or franchisees to decline, and this is an obstacle to the development of the franchise sector, thank you. I seek clarification.
I seek clarification, Mr Chairman. This is related to the question raised by the Honourable Batu Pahat as well. I see that in Budget 2009, among the items is increasing the number of competitive and resilient bumiputera entrepreneurs through franchise and vendor development programmes, and based on the performance of activities, the number of companies, in 2007 - 140, 2008 there were 200, 2009 - 200. But Honourable Minister, I just want a little clarification. I see the number of franchisor companies and the corresponding number of vendor companies: in 2007 - 135 vendor companies. However, in 2008 - 30, in 2009 - 30. Does that mean the 135, 30, 30 are companies or what? If they are companies, I wonder why, when in 2007 there were 140 franchisor companies, vendor companies in 2007 were 135, and in 2009 the number is 200 while the number of vendor companies is 130. I also want to know whether there have been any problems like those mentioned by the Honourable Batu Pahat earlier, faced by these franchisor companies as well as vendor companies, and what action is being taken to enhance the capacity of these vendor companies. Thank you, Honourable Minister.
Thank you, Honourable Batu Pahat and Honourable Tenggara. The real experts on franchising, Jerlun, the Chairman of Franchise Malaysia, has his association. For the information, as I said
earlier, according to our records, 73.3% of those who applied under the Franchise Act have been approved, and I have also been informed that since 2007, there are no more franchise registration applications that have been rejected in order to create more new franchisors, especially bumiputera franchisors. So I will investigate the article the Honourable Member mentioned earlier, because the information given to me is that there are no rejections for new applications since 2007. As for what the Honourable Tenggara raised, I am also not very clear about what type of franchisor this is, because franchisors have many categories. Local citizens of Malaysia who grant franchises are called franchisors, foreigners or non-citizens who become franchisors in Malaysia are known as foreign franchisors. Anyone in Malaysia who becomes a franchisee of a foreign franchisor and is permitted to sell franchises to franchisees is known as a master franchisee or master franchise holder. A person who is granted franchise rights, including the master franchise holder or master franchisee in relation to the franchisor, and the sub-franchise holder in relation to the master franchise holder, is known as a franchisee or franchise holder. There is another term called franchisee of a foreign franchisor. So, the Honourable Member raised earlier that I will investigate how these 140 came about, which one it is, whether it is a foreign franchisor or a franchise holder, so I will take note of the information the Honourable Member has raised earlier.
Honourable Minister, it is already past one o'clock. Shall we continue in the afternoon? If you can finish within 10 minutes, I will give the Honourable Member the floor.
I... can we do it in the afternoon? Yes, just a little more.
Alright. The House will resume sitting. [Deputy Speaker (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar)
Honourable Members, the morning session has ended and we will resume at 2.30 in the afternoon. Thank you. The sitting was adjourned at 1.02 in the afternoon. The sitting resumed at 2.30 in the afternoon. [Deputy Speaker (Datuk Ronald Kiandee) presiding
I invite the Honourable Minister to move the motion.
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, I beg to propose: "That pursuant to Standing Order 12(1), the sitting today shall not be suspended until 9.30 tonight. After that, the House shall be adjourned until 10 a.m. on Tuesday, 25 November 2008."
Mr Speaker, I beg to second.
Honourable Members, I now put the question to the House for decision. The question is that the motion as moved be agreed to. The motion was proposed for decision; and agreed to. The House resolved into Committee. [Deputy Speaker (Datuk Ronald Kiandee) presiding
I invite the Honourable Minister to continue.
Thank you, Mr Chairman, I will continue with the issue of vendor development. The ministry is also aware of the importance of vendor development in providing business opportunities and producing more bumiputera entrepreneurs. Therefore, the ministry is intensifying efforts to attract the interest of GLCs. Under the Vendor Development Programme, or PPV, as raised by the Honourable Rompin, so far 13 GLC companies have joined this programme and succeeded in developing 386 vendor companies. Among the measures taken by the ministry to enhance GLC cooperation in developing more vendors is by holding meetings with all GLC companies to discuss vendor development efforts. Second, activating the Vendor Development Programme Coordinating Committee and the Vendor Development Programme Consultative Council in drafting a new strategy for GLC services in developing vendors. The issue of human capital development - for the information of Honourable Members, under RMK-9 the ministry targets to cultivate a total of 1.5 million bumiputera, with focus given to students, youths, graduates and also women. As of June 2008, a total of 179,457 prospective entrepreneurs have been successfully trained by the ministry, with 20,637 of them having succeeded in becoming entrepreneurs. In an effort to cultivate entrepreneurship at the grassroots level, as proposed by the Honourable Pendang and also Jempol, Entrepreneur and School Cooperative Clubs have been implemented at primary and secondary school levels. These involve not only MRSM participation but also schools under the Ministry of Education Malaysia. The ministry encourages every school to have its own cooperative. Assistance is given to these cooperatives with an initial grant of RM5,000 provided. Meanwhile, loans of up to RM50,000 without collateral are also provided under the SKM revolving capital fund. The establishment of entrepreneur clubs as co-curricular activities is also implemented in an effort to cultivate students in schools. Mr Chairman, the last issue is the allocation and role of the state development corporations. I would like to draw the attention of Honourable Members to the question raised by the Honourable Batu Gajah regarding the RM56.2 million allocated to the Perak State Economic Development Corporation, whether it will be channelled directly to PKEN. For the information of the Honourable Member, for the purpose of entrepreneur and cooperative development in the state of Perak, the ministry has entrusted MARA to implement these programmes as approved in the Ninth Malaysia Plan. This is intended to make it easier for the ministry to monitor the programmes concerned, to ensure that all strategic policies planned can be enjoyed right down to the grassroots level.
Regarding PKEN's outstanding debt to the Federal Government amounting to RM139 million, as also raised by the Honourable Batu Gajah, this falls under the jurisdiction of the Ministry of Finance. Next, Honourable...
Seeking clarification. So from the statement made by the Honourable Member, does this mean that the RM56.2 million, the highest amount, will not be channelled directly to the PKNP account? If so, this RM56.2 information should not be in the PKNP details. This will mislead the actual financial statement. The second point is the loans that are still outstanding. The ministry responsible for PKNP cannot arbitrarily state that they will repay, this is not the ministry's business, this is the business of the Ministry of Finance. I asked whether the ministry monitors their finances, this PKNP, to ensure that all allocations are disbursed or that the loans given succeed in developing and encouraging bumiputera entrepreneurs. If so, this target will not be achieved and will be hindered. That is the question.
Thank you, Honourable Member. As I have stated... Earlier the Honourable Ipoh Barat also stood up and asked the same question. The allocation we give, we give to the state of Perak through MARA. MARA will directly carry out the programmes that have been planned, as planned by the Perak State Development Corporation.
This means the allocation should not have been included in the PKNP details. It is included in the MARA account. If so, the allocated money will not be delivered directly to KPNP but through MARA, so why was the allocation not recorded in the MARA details only? I think, Honourable Minister, if you really want to develop bumiputera entrepreneurs, you must abolish the policy that divides bumiputera entrepreneurs.
This is the state Pakatan Rakyat government. Why can the ministry not cooperate with them, with PKNP under this Pakatan Rakyat? Why play politics using another account? Why can't you trust them? The people's choice, this Pakatan Rakyat, to monitor those finances.
Okay, okay, I understand the meaning of the Honourable Member's question. The allocated money, Honourable Member, is for the provision of business premises, infrastructure development and also basic facilities for industrial zones, and for increasing bumiputera asset ownership through property development. If this is our goal, the problem today is the policies made by PKR, for example, they sometimes make policies that are not in line with us. For instance, a 30% quota, some states under PKR say there is no such 30%. They want to open it to everyone. At the same time, there are PKR states like Selangor - the Menteri Besar is also here - I see their manifesto is very impressive. Like this they say people's economy - providing sufficient business premises. This is PKR's promise. Second, providing business guidance to young people and young women, giving encouragement to young people and young women to do business with minimum rent or only having to pay water and electricity for the first two years, and many more things PKR promises. So the promises PKR made to the people during the election, we do not want to get involved, because we see there are promises made, they are impractical promises, purely theory, campaigning during elections. So this is why Barisan Nasional, when we plan, we plan and implement as we have planned. If we give to the Perak State Development Corporation, for example, or Selangor for example, we do not know what kind of programmes they will carry out. So this is why federal money reaches the people through MARA, and we also have our agencies, implementing agencies in every district.
What is important is what the people get. So if the people benefit from business, we give business opportunities, the people are what matter, and we do not want that later, if the Honourable Member says there is a political issue, we give to PKR, then the approach is different. It is federal money, but people say "the cow's milk, the goat gets the credit." This is politics, Honourable Member. So on this matter we have never denied the people's rights, but we want to ensure that the people benefit from the allocations that we have approved.
Honourable Minister, I believe it is not only the ministry or the Honourable Member who wants to ensure that benefits reach the people. We here, Pakatan Rakyat too. So why can't...
Find your own money.
Do not forget, that is not Barisan Nasional's money. [Interjection] The people of the state Pakatan also pay taxes. So all this...
We also give to the people.
...all are bumiputera, why can't they sit down and discuss? What is the problem, and what I am raising is that in this item (Butiran), the Perak State Development Corporation (PKNP) has the highest allocation at RM56.2 million. If it is true that it was not channelled directly to the PKNP account but to MARA, this item does not reflect the actual situation. This is already correct; these five states were given. It seems that, supposedly, they are honoured to give to PKNP, but in fact not directly to the PKNP account. Is this the correct procedure or not? Is this misappropriation, or does it confuse matters, in that the account may not reflect the actual situation when the funds, after being approved, are ultimately channelled to MARA.
Honourable Member, we give MARA government money too. It is not necessarily through the state of Perak. PKNP, that means it is the people's money. Whether given to MARA or not, it is the people's money that benefits. So that is why, firstly, the policies are different.
If that is so...
The policies are different. We say we want to help give business opportunities to bumiputera; certain quotas must be given, but PKR says there is no need. These particular quotas are allocated to bumiputera. In the previous election PKR promised to help the people, to prepare sufficient business premises, to help entrepreneurs, and then also to provide training, and then further guaranteed RM2 thousand a month. These are election sweeteners; Barisan Nasional did not want to be involved. This is because Barisan Nasional is not a party that merely makes promises to blind the people's eyes, which in the end are not fulfilled. So if PKR wants to fulfil its election promises, okay, find the money yourselves. Our money, we channel it to MARA, and what is important is that the people benefit. That is what matters. What matters is that the people benefit.
The Honourable Member still wants to evade. Earlier I stated that if the allocation of RM56.2 million is not channelled directly to the Perak State PKNP account, this item is wrong and must be corrected. If it was truly channelled to MARA, this reflects that there has been an error in this account. That is the question. I do not want to play politics with the Honourable Minister. Barisan Nasional made too many empty promises, which is precisely why it was denied a two-thirds majority in this House.
[Menyampuk]
What I am raising now is...
DAP is the one that makes many promises.
...the RM56.2 million allocation for PKNP, 00108 – I am only saying the Perak State PKNP. If it is not channelled directly to the Perak account,
the Perak State PKNP, this proves there has been an error in the allocation in this item. If it is to be channelled to MARA, put it in the MARA account.
If you are unable, then surrender it, hand the Perak State Government over to Barisan Nasional, and we will govern it again.
Itu persoalannya.
Yes, solve the problem, Honourable Member.
Jawab.
Honourable Minister, let me continue briefly.
[Menyampuk]
Let me continue briefly, Honourable Minister.
Are you going to give way to Jasin? Jasin, Jasin.
This is from experience, is that alright? This is from my own experience, my responsibility regarding PKNM Melaka. In fact, all allocations that we apply for from the ministry, from one figure, whether they are channelled to MARA or to the state development corporation. These allocations are of two kinds: federal allocations, either in the form of loans or in the form of grants. Loans, we have to repay. So whatever item is mentioned in that book covers either MARA or PKNP. He just now actually confused the Honourable Minister. In fact the allocation given to the state of Perak is for PKNP and also for MARA, whether in the form of grants or loans. What I want to say one more thing, Honourable Minister, is that I actually saw that the Honourable Minister has given an explanation for more than a day. I was really very pleased and saw the minister so earnestly introducing various programmes in line with the ministry's strategy to develop bumiputera entrepreneurs. This is in fact in line with the government's wishes under the third pillar of our National Mission, namely addressing socio-economic imbalances. I congratulate this. At least our minister has a target of how many bumiputera entrepreneurs to produce so that we can further narrow the very significant gap, bumiputera equity versus non-bumiputera. Now we only have 19%, Minister. So I would like to propose, if possible, that we do not listen to these matters that are of no consequence. Let us focus on the fundamental matters. [Applause] If we are truly serious about increasing bumiputera equity from now on, I would like to propose, if possible, that the ministry consider this, because if we go by the domestic savings amount, domestic reserve, Malaysia is the highest at 37% compared with America's 0%. Our savings have now reached RM1 trillion. This shows Malaysians are strong savers. So I would like to propose that one way to increase bumiputera equity is to limit ASB shares to RM200 ribu only. Bumiputera have money. Tell them to keep saving until it reaches RM300 ribu. Naturally, our savings will then be greater and our equity will increase. Secondly, I would like to propose, if possible, the fastest way to increase bumiputera equity. Our agencies such as MARA and the Urban Development Authority (UDA) should buy property overhang, houses or shops. Those for bumiputera, we buy.
Then we rent them out, or we rent-to-own, or we wait until bumiputera have the capacity to buy.
Yes, that's enough, Honourable Member.
With this, the quota will not fall and we can defend bumiputera rights. Thirdly, I would like to propose, if possible, to the Honourable Minister...
Sounds like a speech, Honourable Member.
I would like to propose, this is my proposal to the minister, can the minister? Yes, the minister says yes, Mr Chairman. I propose to our agencies, our GLCs that have a lot of money and large savings. Why do we keep so much money? What is the point of waiting for our beautiful accounts? Look for, if possible, buy assets that are important for bumiputera, because by doing so we can naturally raise bumiputera equity. We want to see how much longer before we reach our target and goal of 30% bumiputera ownership? So this is my proposal, Minister. Thank you very much.
Thank you, Honourable Member. This is the difference between theory and practice. He is practical because he was a former Exco who looked after entrepreneurs.
May I interject?
Okay, go on.
The issue is not whether to give or not, it's a issue of wrong reporting sahaja. So if the minister says this will be changed and included in the MARA account, okay, then there is no problem. That is not a very big matter in this effort, but the issue is that once it has been recorded here, the officer concerned must make a report that this will be changed. That is a change to this account. When we approve the budget in this Committee, we also want to know the issue. That is why I did not raise Selangor. Even so, I know that if they did not give it, I would write to the ministry to have it cancelled, so that there is no reporting. Because one of the most important problems for us is that when we approve this budget, this budget is the product of taxes and national income. Therefore, the orderliness of our reporting, especially by the officers who handle this, is important so that it is not questioned. If tomorrow in the consolidated account, this will be questioned, because in tomorrow's audit they will ask whether it was really given or not, that is all. But I think we do not need to talk about this matter, because we believe we can do the work. If the government does not wish to give to the states and give to the people, then give it in the correct way so that there is no leakage and in a way that produces the best results. But we will monitor that on behalf of the people. So if MARA wishes to carry out its work, go ahead. That is not a matter to be discussed. The minister's answer was only that he would not give to certain states because he wants to channel this route to MARA, or this column to MARA entirely. That is all that needs to be debated.
Thank you, Honourable Member from Bandar Tun Razak, who is also the Menteri Besar of Selangor. It has already been explained, and the Most Honourable is also aware, that the one who does not understand, this Honourable Member for Batu Gajah, has never been an Exco, so he also does not know. So that is why...
[Bangun]
Listen first, I want to explain. The issue now is the same as in Selangor. I did receive a letter from the Selangor State Development Corporation (PKNS) requesting an appeal and allocation. So we will see, we will
consider it, because when it is written in there, all this time, even when we were with Barisan Nasional before, we did not give such a lump sum all at once. We gave state by state, because the need was given. I have already said that their need is, for example, to buy business premises. So suppose tomorrow, MARA also identifies premises to buy in Perak, in the state of Selangor. So this money we will use for the benefit of the people of Perak and also for the benefit of the people of the state of Selangor. So the question of our federal money not being given to the people does not arise. This money is federal money that we give to the people, but our method of managing it and our method of buying, as the Honourable Member for Jasin said, thank you very much for helping regarding the Exco. So if, for example, Selangor gets it and Perak wants it, that is from us looking at the reasonableness of the applications made. So that is all, Mr Chairman. I think, Mr Chairman, that is all I wish to convey in the Ministry of Entrepreneur and Cooperative Development (MECD). So I thank the Honourable Members very much who took part in this debate, especially those directly related to the Ministry of Entrepreneur and Cooperative Development. With that, I move the motion. Thank you.
Honourable Members, the question is that the sum of RM2,342,153,400 for Purpose B.26 under the Ministry of Entrepreneur and Cooperative Development, forming part of the Schedule, shall be agreed to. The question was put and agreed to. The sum of RM2,342,153,400 for Purpose B.26 is ordered to form part of the Schedule.
The question is that the expenditure of RM1,423,377,800 for Purpose P.26 mentioned in the Development Estimates for 2009 shall be approved. The question was put and agreed to. The sum of RM1,423,377,800 for Purpose P.26 is approved as part of the 2009 Development Estimates.
Motion — Sitting Hours and Business Exempted from Standing Orders — Head B.27 [Schedule] – Head P.27 [Development Estimates 2009] –Motion
Supply Head B.27 and Development Head P.27 under the Ministry of Works are open for debate. The Honourable Member for Serian.
Thank you, Mr Chairman. I wish to touch on Item 06260 – Road Upgrading (I) Sarawak, Item 09260 – Road Upgrading (II) Sarawak, Item 09600 – Road Upgrading (III) Sarawak. Mr Chairman, what I want to raise here is a road known as Jalan Mentong. Jalang Mentong was built in the early 1970s. So the length of this road is 30 kilometres. The problem here, Mr Chairman, is that out of the total length of 30 kilometres, only 18 kilometres have so far been tarred or asphalted. This means 12 kilometres still need to be tarred. So Mr Chairman, I ask through the allocation specifically distributed and allocated for the state of Sarawak in this year 2009, so that this road can be included using this allocation. Next I want to touch on Item 09280 – Construction of Sarawak Roads and Item 09800 – Sarawak Road Construction. Mr Chairman, the Sarawak State Government through the State Planning Unit, namely the Sarawak State Planning Unit (Unit Perancang Negeri Sarawak), through the Public Works Department (JKR), has submitted or listed a road in the Serian Parliamentary constituency, namely the roads called Jalan Terbat - Muara Ahi - Mapu.
Mr Chairman, in the original approved list, namely the projects to be implemented in the Ninth Malaysia Plan, this road, Jalan Terbat - Muara Ahi - Mapu, was indeed included. However, what is sad is that when the mid term review or half-term study was approved, this road went missing, it was missing. So Mr Chairman, I ask...
Missing from the list?
Missing from the list, missing, it was missing from the list. So this is missing in action. So this, Mr Chairman, when the villagers hear this, the people in my Parliamentary constituency, especially the villages that use this road, are very disappointed, because in fact at the end of the road, the length of this road is actually only 7.5 kilometres.
What is strange, Mr Chairman, is that road: Jalan Terbat - Muara Ahi - Mapu. At the end of that road there is a road called Jalan Dahak. I use the word strange because Jalan Daha at the end of that road, 5.3 kilometres long, has actually been asphalted, almost like a highway. So the problem here, with your permission, Mr Chairman, is that although the end section of the road has been asphalted, the middle section is like a road, if I may use, is equivalent to logging track, where it becomes muddy in the monsoon season and dusty in the dry season. So that is all, Mr Chairman, that I wish to bring to this august House, in the hope that the Honourable Deputy Minister...
Pasir Mas has already stood up, Honourable Member.
Yes. In the hope that this road, namely Jalan Terbat - Muara Ahi - Makpuk, which has gone missing from the list in this Mid-Term Review, can be seen and reinstated. Thank you.
Thank you, Honourable Member, Mr Chairman. B.27 and P.27 02800 - Repair, Replacement and Upgrading of Roads and Bridges. I want to ask the ministry about the performance of the Sultan Yahya Petra Bridge, which is to be widened by four lanes. In the last sitting of the Dewan Rakyat, I raised this matter and I want to know about its performance. At that time I mentioned the price of RM142 million, which I said was expensive, and this project was done by direct negotiation. However, I did not know that it went as far as KB Mall, that there is a flyover, which I think, if that is the situation, then surely the price... I have asked after and made investigations; it is fairly reasonable. However, the implementation of this project was delayed because, as I understand it, of the problem of rising iron prices due to the recent increase in petrol prices, and the contractor has applied for an additional allocation of RM60 million. Is it right or not, wallahualam, I am asking whether it is correct and whether this matter will be considered. We know that many contractors have asked for the contract prices signed before the earlier petrol price increase to be reviewed. However, I also remind the ministry that many contractors have bought raw materials, including iron, before the petrol price increase. So when petrol prices rise, I hope no party takes advantage, where materials that have already been bought all side before the petrol price increase are considered and given additional allocation by the government. Unless these construction materials have not yet been bought, but after the petrol price increase the prices of these construction materials have risen, in which case it is up to the government to consider them properly. I give my full support so that projects important for the interest of the people are not delayed. The second point, Mr Chairman, I want to raise the bridge in Kelantan too, namely the Pasir Mas Salur Bridge. This is a bridge built
after the Sultan Yahya Bridge in 1986. At that time I first became a Member of the Dewan Rakyat in the First Term...
Barisan Nasional. [Interjection]
Barisan Nasional, that's right. This project was the result of efforts by the former Deputy Prime Minister, the late Yang Amat Berbahagia Tun Abdul Ghaffar Baba. I still remember that I worked to obtain this project through the goodwill of the late Yang Amat Berbahagia Tun Abdul Ghaffar Baba. This bridge is also a two-lane bridge, and we know that in Kelantan the traffic congestion, only God knows. Whether it is the rainy season or festive seasons, or not rainy and no festivals, the traffic congestion problem in Pasir Mas, in Kota Bharu and around Kelantan, is very troublesome. So the need for a bridge...
May I ask for clarification?
This Sabahan has nothing to do with Kelantan; does it have something to do with the Kelantanese people?
Thank you, Honourable Member. I sympathise with the situation faced by the Honourable Member. My question is, what causes this congestion that cannot be overcome? Is it due to human factors or natural factors, or other factors, which perhaps today I think the Honourable Member can raise with the government and the ministry so that the problem the Honourable Member faces can be resolved. Thank you.
Semua masalah Yang Berhormat boleh diselesaikan kalau kita ada political will, with respect, ada kemahuan dan Kelantan ini tanahnya lapang. Walaupun selalunya banjir tetapi kalau ada perancangan, kesungguhan pertolongan Kerajaan Pusat, saya rasa boleh diatasi. Lebih cepat lagi kalau saya jadi Menteri Besar Kelantan, insya-Allah itu lebih cepat. Mr Chairman, saya hendak sebut tadi masalah Jambatan Pasir Mas Salur ini juga perlu diperbesarkan dan dijadikan empat lorong bagi membantu mengatasi masalah kesesakan lalu lintas ini. Jambatan ini belum lagi dinamakan apa-apa nama jambatan, yang dipanggil Jambatan Pasir Mas Salur agak panjang. Maka untuk itu, saya ingin mencadangkan kepada pihak Public Works Department (JKR) memberi nama kepada jambatan ini iaitu nama Jambatan Tun Abdul Ghaffar Baba bagi mengenang jasa sumbangan dan peranan yang dibuat oleh bekas Timbalan Perdana Menteri yang banyak juga di Kelantan. Jambatan ini adalah hasil daripada usaha beliau, waktu itu tidak ada peruntukan maka beliau bersungguh-sungguh sehingga jambatan ini menjadi kenyataan dan saya cadangkan ianya dinamakan Jambatan Tun Abdul Ghaffar bin Baba. Manakala jambatan yang ketiga iaitu Jambatan Duli Yang Maha Mulia Sultan Ismail Putra Kelantan iaitu Jambatan Tendong yang dibuat baru-baru ini sudah pun siap, cantik dan digunakan oleh rakyat. Cuma tinggal lagi saya dapati susah sangat kah pihak JKR hendak letakkan nama buat papan tanda yang cantik, tugu di seberang Salor, di seberang Pasir Mas, dinamakan Jambatan Sultan Ismail Putra. Nama tidak ada, bila nama tidak ada jambatan ini Mr Chairman orang dok panggil ini jambatan Honourable Ibrahim Ali ini yang saya pening ini. Jadi saya hendak pastikan nama ini betul-betul sebab jambatan ini sudah pun dinamakan dengan cara rasmi, nama ke bawah Duli Yang Maha Mulia Sultan Kelantan Darul Naim dan Duli Yang Maha Mulia Tuanku sendiri rasmi. Tetapi sampai sekarang saya tengok belum ada lagi tanda yang diletak di sebelah Salor ataupun di sebelah Tendong. Saya harap perkara ini dipercepatkan. Mr Chairman, satu lagi ini jambatan juga. Oleh kerana saya katakan kesesakan lalu lintas, saya tidak boleh bayangkan lima, enam, tujuh tahun akan datang. Sebelum ini ada satu lagi jambatan yang paling penting yang sepatutnya dibuat iaitu di antara Kampung Laut dan juga ke Tambatan Diraja yang sudah diletak batu asas beberapa tahun yang lalu tetapi sekarang tidak dapat dilaksanakan oleh kerana kerajaan negeri tidak mampu. Saya harap jambatan ini dimasukkan dalam senarai pembangunan Tenth Malaysia Plan nanti ataupun kalau boleh ditimbang untuk tahun hadapan kalau dikira projek East Coast Corridor di antara yang penting ialah jambatan ini saya kira sebab dia boleh tambah nilai kepada usaha untuk menarik pelancong di Kelantan. Sebab kalau jambatan ini
dibuat dengan begitu indah sedikit ia boleh menceriakan Sungai Kelantan dan satu hari nanti kita akan tengok kapal-kapal kecil Cruise masuk ke Sungai Kelantan seperti di Nil River.
Itu pun kalau saya jadi MB jugalah, saya bergurau sahaja Mr Chairman, itu tambahan-tambahan. [Ketawa] Cuma tinggal lagi jambatan ini penting, saya serius, jambatan ini amat penting dan kosnya saya percaya ianya tidak banyak dan boleh membantu menghuraikan masalah kesesakan lalu lintas, Kota Bharu ke Tumpat, Jambatan Sultan Yahya Kota Bharu ke Pengkalan Kubor, Tendong di Pasir Mas ke Salor dan jambatan di Salor pula dijadikan dua lorong ini. Insya-Allah ia akan mengubah bentuk landskap bandar Kota Bharu dan Kelantan, insya-Allah Mr Chairman. Jadi selain daripada itu, akhir sekali Mr Chairman saya nak menyebut masalah pembinaan, juga Upgrading of Road - 028000 seperti saya sebutkan tadi. Saya nak tanya bila jalan, saya difahamkan tanah-tanah sudah pun diambil iaitu jalan dari Tanah Merah sampai ke Cabang Empat Pasir Pekan yang telah menjadi jalan JKR. Jalan ini sangat penting, inilah jalan laluan ke negara Thailand pun. Jalan yang paling mustahak tetapi sampai sekarang masih lagi dua lorong, bengkak-bengkok, banyak yang rosak dan belum lagi dinaikkan taraf. Yang saya difahamkan, tanah-tanah sudah pun diambil, yang saya harap dapat dipercepatkan. Begitu juga jalan dari Jambatan Tendong merentasi ke Tendong sampai ke Meranti dan sampai ke Tumpat, ia juga sepatutnya diperbesarkan. Jadi itu sahaja Mr Chairman, saya berharap mendapat jawapan daripada ...
[Bangun]
Ini semua dah bangun, belum habis lagi, duduk dulu. [Ketawa] Jadi Mr Chairman, terima kasih, saya harap dapat jawapan dari pihak kementerian. Terima kasih.
Terima kasih Mr Chairman, sedikit sahaja. Saya pun hampir-hampir sama dengan the Honourable Member for Pasir Mas. Dia membincangkan soal traffic jam, soal jambatan. Saya membawa masalah saya ini, kalau saya tidak silap semenjak saya jadi wakil rakyat tahun 1999 sehingga hari ini belum juga masalah ini selesai. Mr Chairman, saya hari ini terlampau baguslah, kalau tidak saya ingat saya akan cakap apa yang perlu saya cakap. Sebab saya tidak tahan dengan pertanyaan-pertanyaan yang dikemukakan oleh rakyat saya. Setiap kali saya balik kawasan, mereka tanya bila kerajaan nak bina Jalan Tongod – Pinanga. Saya boleh tunjukkan gambar kepada Mr Chairman bagaimana bentuk gambar jalan ini pada ketika ini dalam keadaan tengkujuh, hujan lebat. Hari ini antara kampung dengan kampung tidak boleh berhubung disebabkan hujan lebat dan dijangka banjir.
Saya pernah lalu jalan itu Yang Berhormat.
Ya, saya meminta kerajaan supaya rasional ke arah melihat bagaimana pembangunan jalan raya baru ini diwujudkan. Jangan ada unsur-unsur diskriminasi. Di bandar, mereka berbicara tentang melebarkan jalan. Di Kinabatangan saya berbicara tentang jalan yang tidak ada. Kenapa tidak dinaiktarafkan sejak sekian lama? Apakah sebab mereka orang kampung dan keperluan mereka tidak ada? Sedangkan jalan raya ini mengeluarkan hasil mahsul kelapa sawit, kayu balak dan sebagainya tetapi tidak ada perhatian langsung. [Tepuk] Saya minta kerajaan, kementerian ini memutuskan kalau kita mahu memerintah lagi negara ini, bantu orang luar bandar. [Tepuk] Kalau tidak bermakna orang lain akan memerintah. Apa masalah? Bukan berbilion-bilion, cuma sedikit sahaja kalau dibandingkan
dengan cadangan Jambatan Pulau Pinang berbilion-bilion, high speed broadband, berbilion-bilion. Ini tidak banyak tetapi tidak juga boleh diadakan.
Yang Berhormat, tadi Yang Berhormat cakap hari ini baik hati. [Ketawa]
Saya kadang-kadang tekanan perasaan ini Yang Berhormat Mr Chairman, membuat saya lebih emosi sedikit. Saya meminta, saya bercakap tentang jalan ini sahaja.
Itu paling baiklah itu.
Saya tidak mahu cakap soal-soal lain sebab saya mahu Kementerian Kerja Raya, menteri yang baru, dia tidak ada hari ini, dia punya timbalan sahaja dihantar. Dia, saya difahamkan masih lagi berada di Sabah tetapi saya kata, "Yang Berhormat pergi tengoklah jalan raya saya, jangan tengok jalan raya yang dekat-dekat bandar sahaja". Dia ketawa-ketawa pula. Saya merayu, saya meminta, saya memohon kerajaan melaksanakan jalan raya ini mulai tahun hadapan. Saya tidak mahu dengar JKR membuat alasan nak buat survey, nak buat apa. Kalau nak buat survey awal-awallah, tahun 1999 saya sudah cakap, saya sudah bersuara soal jalan ini. Kenapa tidak ada survey awal? Kenapa tidak dilaksanakan awal, bajetnya dan sebagainya. Ini yang menghairankan saya dan saya terus terang, saya tidak senang hati dan rakyat saya tidak senang hati.
Keluar Barisan.
Keluar Barisan jauh sekali, bukan masuk pembangkang boleh jalan ini siap. Itu persoalan bodoh! Soalan bodoh dapat jawapan bodohlah. Saya yakin, saya percaya bahawa kerajaan ini berkemampuan, cuma mungkin ada masalah dalam peringkat kementerian. Jadi kalau ada masalah, kalau perlu diganti, ganti sahaja. Kalau Menteri tidak kerja, ganti Menteri, kalau KSU tidak kerja, ganti KSU. Bukan susah. [Tepuk] Itu sahaja.
[Bangun]
Ya, the Honourable Member for Padang Besar, badan pun besar.
[Ketawa] Mr Chairman, saya hendak tanya the Honourable Member for Kinabatangan. Bukankah sebenarnya Yang Berhormat bahawa antara pelancong asing dari Eropah terbanyak sekali antaranya melawat kawasan Yang Berhormat. Di situlah banyaknya, di situlah pelaburannya, di situlah apa segala perbelanjaannya. Lebih baik buat jalan di Kinabatangan daripada kita belanja buat hospital, jalan besar-besar macam Yang Berhormat Pokok Sena itu dan orangnya tak undi kerajaan juga. Jadi nak tanya Yang Berhormat, betul ke tidak saya kata?
Rasa saya inilah, [Ketawa] kerajaan kita ini terlampau bagus, dia sudah tahu tempat pembangkang tidak boleh menang pun, dia bagi juga. Kelantan tetap kalah, berbilion-bilion dia bagi. Saya pun hairan, apa punya kerajaan terlampau baik hati. Seharusnya kita identify lah mana-mana negeri yang memerlukan peruntukan lebih-lebih lagi negeri memihak kerajaan, mendatangkan hasil keuntungan dalam industri pelancongan. Kenapa tidak diberi peruntukan? Jalan raya yang bagus boleh mendatangkan banyak wang pelabur-pelabur daripada luar.
[Bangun]
Yang Berhormat Padang Serai minta jalan Yang Berhormat.
Ini apa ini?
Terima kasih Mr Chairman, terima kasih the Honourable Member for Kinabatangan. Saya cukup sedih bila the Honourable Member for Kinabatangan mengatakan rintihan dan tangisan Kinabatangan. Saya percaya menteri tidak dengar. Jadi the Honourable Member for Kinabatangan, saya syorkanlah seperti kata the Honourable Member for Padang
Besar tadi, di kawasan-kawasan yang dimenangi pembangkang banyak jalan-jalan raya dan pembangunan dilakukan. Beralih saja ke sini, tukar, datang ke sini.
[Ketawa]
Apa punya soalan, tak ada standard langsung.
Itu tidak ada soalan, dia main politik, politik cetek saya tidak mahu layan. Kita politik lebih tinggi classnya. [Ketawa] Mr Chairman, cuma satu yang terakhir saya meminta pegawai-pegawai, mana pegawai yang ada di sini? Catat apa yang saya hujah pada hari ini, kemukakan kepada Menteri, kepada Secretary-General (KSU), kepada pengarah-pengarah sama ada JKR di Kuala Lumpur atau JKR di negeri Sabah. Saya berkehendakkan Jalan Tongod - Pinanga ini dilaksanakan dengan apa cara sekalipun. Jangan ada tangguh-tangguh sebab saya sudah cukup bersabar, berpuluh tahun saya bersabar. Hari ini kesabaran saya sudah tidak tahan lagi. Saya cakap terang-terang, mana-mana pegawai yang hadir pada hari ini, anda semua bertanggungjawab untuk membawa perkara ini kepada pihak atasan. Kalau tidak anda semua turut berdosa kepada Allah SWT, kalau dia orang Islam.
Kalau tidak rakyat akan menghukum kita. Itu saja. Jadi pastikan tahun akan datang saya tidak mahu bicara lagi soal jalan ini sebab saya sudah bicara dalam Hansard dan ia boleh dicheck, berpuluh-puluh kali saya bicara. Cukuplah kali ini. Saya mahu perkara ini diselesaikan. Terima kasih Mr Chairman.
Terima kasih Mr Chairman. Perbahasan kini saya hendak tumpu khususnya ke Pulau Pinang. Saya ingin berhujah berhubung dengan Bekalan B.27 dan P.27 Butiran 02500 - Peruntukan Baikpulih Jalan di Pulau Pinang. Peruntukan bagi tahun ini telah kurang hampir RM14 juta iaitu RM4.5 juta kurang berbanding dengan tahun 2008 iaitu RM18 juta. Soalannya, mengapa potong perbelanjaan tahun ini untuk peruntukan ini? Saya harap bukan fasal pembangkang menang di Pulau Pinanglah. Saya juga ingin menarik perhatian kepada Butiran 202800 iaitu Membaiki, Mengganti dan Menaikkan Taraf Jalan dan Jambatan. Adakah kerajaan sedar bahawa ada jalan yang penting yang terbengkalai iaitu Jalan Teluk Kumbar ke Balik Pulau dan kontrak ini juga telah diberi kepada satu kontraktor wibawa tetapi terbengkalai. Sudah agak lama perkara itu telah berlaku. Saya minta kalau boleh kerajaan memberi perhatian dan kontrakkan semula supaya jalan ini siap sebab ia jadi satu masalah dan bahaya kepada penduduk-penduduk di Balik Pulau dan juga di Telok Kumbar yang menggunakan jalan itu. Selain daripada itu, jalan di Queensbay dan Kostal Highway yang amat menyedihkan yang dibuat melalui kontraktor yang besar. Di mana kita lihat bahawa jalan itu bila dibuat tidak ditambak dengan baik, tidak di level dengan baik, jalan itu berombak-ombak, beberapa kemalangan telah berlaku dan menganiaya rakyat Pulau Pinang. Ini memberikan gambaran negatif sebab jalan ini digunakan oleh ramai pelancong-pelancong yang menggunakan jalan lapangan terbang. Lagi satu isu saya minta penjelasan dari Yang Berhormat Menteri ialah tentang Projek PORR iaitu Penang Outer Ring. Mula-mula dengar jadi, selepas itu tidak jadi, lepas itu jadi, tidak jadi. Saya pun tidak tahu keputusan yang sebenar. Akan tetapi yang penting ialah Pulau Pinang perlu Penang Altering Road ini sebab jambatan yang ada sekarang ini pelebarannya akan siap pada tahun depan dan kita percaya ramai lagi trafik akan ke Pulau Pinang. Jambatan kedua pun targetnya untuk siap tahun 2012. Kalau jalan disposal tidak ada di Pulau Pinang, ia akan menjadi satu masalah yang besar dan akan menyusahkan rakyat Pulau Pinang. Malah isu Pulau Pinang sebagai hub Northern Corridor akan jadi gagal.
Akhir sekali Mr Chairman saya hendak sentuh tentang tol di Sungai Nyior di Butterworth. Tol ini sepatutnya tidak perlu. Dia charge 50 sen. Akan tetapi apabila you charge tol ini, bermaksud untuk menyenangkan pengguna. Akan tetapi sebenarnya tol ini menjadi masalah kepada rakyat tempatan. Ia menjadi satu masalah kepada trafik sebab trafiknya sangkut selalu dan kita bubuh tol ini untuk menyenangkan. Akan tetapi oleh sebab terlalu sesak, saya mintalah kerajaan kaji semula dan kalau boleh berhentikanlah tol di Sungai Nyior ini. Bukan sesak sangat pun 50 sen saja. Ini akan memberi kesenangan kepada rakyat di Butterworth. Terima kasih. Itu saja Mr Chairman.
Terima kasih Mr Chairman. Saya ingin menyentuh satu perkara merujuk kepada Butiran 010300 mengenai Pembinaan Sebuah Poliklinik Baru di Taman Universiti Skudai di kawasan saya. Mr Chairman, terlebih dahulu saya hendak mengucapkan tahniah dan terima kasih kepada Ministry of Health Malaysia kerana telah meluluskan Projek Pembinaan Poliklinik Taman Universiti dalam jawapan lisan tiga tahun yang lepas, menurut jawapan yang diberikan pada tahun yang lepas, projek ini telah diserahkan kepada pihak JKR. Akan tetapi sehingga sekarang, projek ini masih belum dimulakan. Mr Chairman, sebanyak 80% penduduk dari Skudai dan Gelang Patah adalah golongan bawahan. Mereka menghadapi masalah yang sulit kerana hanya terdapat sebuah poliklinik di Skudai untuk menerima perkhidmatan rawatan. Mereka terpaksa lama menunggu giliran kerana pesakit yang datang meminta rawatan adalah ramai. Poliklinik ini adalah berlokasi di dua buah rumah kedai yang telah digunakan selama 20 tahun. Bangunan poliklinik adalah lama dan berkeadaan buruk. Kemudahan yang sedia ada adalah kurang dan tidak sempurna. Mengikut kajian, terdapat 250 hingga 300 orang pesakit yang meminta perkhidmatan rawatan di poliklinik ini tiap-tiap hari. Maka, bilakah Kementerian JKR dapat menjalankan projek ini? Mr Chairman, saya ingin mengambil kesempatan ini memberi desakan kepada pihak JKR supaya dapat menunaikan perjanjian mereka dengan membina poliklinik di Skudai dan kawasan saya secepat mungkin. Dengan ini saya menyokong.
Terima kasih Mr Chairman. Saya akan dengan ringkasnya merujuk kepada Butiran 060500. Sebelum ini pada bulan Mei yang lalu, Yang Berhormat Menteri ada memberitahu dalam Dewan ini bahawa telah ada satu jawatankuasa untuk membuat satu kajian. Di mana akan berunding dengan konsesi-konsesi tol untuk melihat sama ada boleh diturunkan harga tol. Saya hendak tahu bolehkah pihak kementerian memberi sesalinan hasil keputusan kajian tersebut? Di mana sebelum ini ada dimaklumkan dan dilaporkan bahawa pihak kementerian akan melihat dan mengkaji dalam aspek unjuran trafik dan kutipan tol yang diterima oleh konsesi ini dan sama ada dari aspek itu kadar kenaikan trafik, kutipan tol meningkat sama ada boleh diturunkan charge tol kepada pengguna. Saya pohon pihak Menteri boleh memberi dan membentangkan laporan tersebut. Biar kita bersama-sama melihat hasil kajian tersebut. Apakah benar konsesi-konsesi ini sepanjang masa ini mengalami kerugian? Kita tidak payah melihat dalam laporan bahawa PLUS Expressway di mana mengaut keuntungan RM1.1 bilion sebelum cukai. Jadi, apabila orang ramai memohon dikurangkan kadar tol tersebut apabila harga barangan dan minyak naik, kita selalu mendengar suara-suara menyatakan bahawa pihak kerajaan perlu membayar pampasan. Jadi, saya berharap dengan mengumumkan atau memberi sesalinan hasil keputusan kajian oleh kementerian itu, kita semua tahu apa keadaan kedudukan kewangan sebenar konsesi-konsesi ini. Ini perkara pertama. Perkara kedua adalah berkenaan baru-baru ini pada minggu lepas diumumkan bahawa PLUS telah memutuskan menjalankan kononnya corporate social responsibility dengan mengurangkan atau memberi diskaun sebanyak 10% mulai tahun depan apabila pengguna menggunakan lebuh raya itu dari jam 12 tengah malam hingga 7 pagi.
I would like to know whether the ministry has conducted a study. Is traveling at that time a safe period, because we have heard that many associations and organisations are still dissatisfied with the discount that has been given? The discount given by this concessionaire appears to be more for the benefit of the concessionaire, because we read that the reason given is to distribute traffic, with permission. Encouraging the public to use electronic tags. Those are the two reasons given. In my view, the discount given is more of a window dressing only, with permission. If it were truly corporate social responsibility, it would give more thought to the interests of users. Is it safe?
Thank you, Mr Chairman. I would like to ask for an explanation from the Honourable Member for Batu Gajah. Is the Honourable Member for Batu Gajah aware that the concession agreements granted to PLUS are highly lopsided? They are contracts that have given greater advantage to the concessionaire, and as a result the ones who lose are the people, the ordinary public. Does the Honourable Member agree that these contracts should be reviewed? If it can be set aside, does the Honourable Member agree?
Thank you, the Honourable Member for Batu Gajah. Briefly, referring to the same details. Does the Honourable Member know that the RM180 million allocated as a One-Off for this provision is a provision in preparation for reducing the toll rate, but compensation is given by the government, or is this compensation money the same as in previous years? But last year it appears blank here, it was allocated as in previous years to the concessionaire.
I think both questions raised by the Honourable Member for Telok Intan and the Honourable Member for Petaling Jaya Utara need to be answered by the ministry. Let there be sincerity in what we are about to approve, the RM180 million compensation. What is its purpose? What is the reason? This needs to be accountable; the ministry needs to be accountable. All this time, I find it very strange, Mr Chairman. Why does the ministry, which has all the expertise, and can find individuals with various expertise, produce a contract that is so detrimental to users, detrimental to the people? The Minister said the other day that there is no room for cancelling the toll collection or reducing the toll charge. It depends on the concessionaire. There is no clause that allows the ministry to do so. Why is that so? Why is it so weak in the aspect of preparing a contract in which both parties, or the users, are not harmed in this way? So I return to the earlier question, corporate social responsibility. When I read the announcement made by PLUS that it would give that discount, the first thing that came to my mind was whether it is safe, especially for women to travel at that time? Is it safe? Also, at that time, is it not from 12.00 midnight to 7.00 in the morning that most heavy vehicles use those tolls, those highways?
Mr Chairman, I would like to ask the Honourable Member for Batu Gajah, in view of what the Honourable Member for Batu Gajah has stated, does the Honourable Member agree or share my view that, I think, the PAC should investigate this matter?
If the Chairman of the PAC were here, he could freely disclose everything, and we would support him. Not only this case, the Pempena case is also under the Ministry of Tourism. So the ministry also said when answering the question from the Honourable Member for Puchong LDP. The traffic congestion is extremely severe. I challenge the Minister to ask for the NPE near Pantai Ekspres NPE. Make it toll-free for just one week. Exempt the toll, and we will see that when there is no toll collection, the traffic will not all pass through only one route. Spread the toll burden. Via the NPE it is RM3.20. From Puchong via IOI over there
toll is RM1.60, and up to Jalan Bangsa it is RM4.80. That is very burdensome. This, I am very sure the Honourable Member for Batu Pahat must support. Let us see....
Earlier you said you only wanted to speak a little, briefly. Now it has been 30 minutes.
Why worry, Honourable Member for Batu Pahat? This is in the interest of the people. Mr Chairman, if we can take up this challenge and exempt the toll. Give just one example, the NPE, for one week. Let us see the traffic flow. I hope, this is not a small matter. The toll payment has been burdening the people for some time now. So I request that the ministry give a good answer and explain this matter. That is all, thank you.
[Bangun]
Thank you, Mr Chairman. I also wish to debate the matter of Maksud B.27 beginning with Item 040700 - Environment and Energy Efficiency Branch. Regarding a road that is being built in my own area, Jalan Jitra-Kodiang, which is still under construction. It was found that there are problems related to the drainage system. Where, before this road was built, whenever there was heavy rain, water was always channelled properly into the rivers and no flooding or pooling occurred. However, recently, whenever there is heavy rain, areas that should not be flooded have become flooded, and even the mosques and suraus have been affected by this water. So I request, firstly, that the Environment and Energy Efficiency Branch item focus on the matter of water flow so that such problems do not happen again. Also for that road, Jalan Jitra-Kodiang, its drains should be built adequately so that water can be channelled to the rivers on the other side, so that there is no further pooling and flooding in that area. Secondly, regarding Item 030200 - Aerodrome and Maritime Branch. This is in turn related to the airstrip at Pulau Layang-Layang under the Federal Territory of Labuan. I find that the number of tourists to the island has increased, as a result of advertising done all over the world. More and more tourists who enjoy diving are visiting Pulau Layang-Layang. I would like to know whether the ministry intends to upgrade this airstrip so that aircraft larger than the Skyvan and Twin Otter, with permission, currently in use, can be upgraded to aircraft such as the Fokker 50 and so on.
In this way, of course, we will be able to bring tourists from Kota Kinabalu or from Labuan itself to the island, and at the same time increase tourism on the island. Lastly, Item 060500 - Toll Compensation Payment, where I wish to touch on Smart Tag and Touch'n Go. We find that both these facilities help users of these toll roads, and I would like to ask whether the ministry intends to increase the number of Smart Tag and Touch'nGo lanes to facilitate the movement of vehicles on these toll highways. That is all, thank you.
Thank you, Mr Chairman. To the Honourable Minister and all the Honourable Members, I too wish to join in debating in this Ministry of Works some issues involving the cooperation of all parties in ensuring that our roads can accommodate the very rapid development of the car industry.
I wish to give a little view, because it is relevant. When we talk about traffic congestion and roads that can no longer accommodate the congestion, we must refer that problem to the development of the car industry, which today, if counted as the total industry, its volume has risen to nearly 500,000 units by the end of this year. My question is not about the cars, my question is how the ministry, in the business sector under Item 03000, can coordinate with the developments that exist, so that all planning in road development can be coordinated and this ministry can keep up with the roads we see today in big cities such as Penang and Kuala Lumpur in particular, where we face severe congestion problems. I will take one example, if we look at the road in Penang from the town of Bayan Lepas to Telok Kumbar. Earlier, the Honourable Member for Bayan Baru mentioned the Telok Kumbar to Balik Pulau project which today has been abandoned. But worse than that, from the town of Bayan Lepas to reach the Simpang Tiga Permatang Damar Laut junction, we face a narrow road, a bottleneck. At that time we see that it causes very severe congestion because people who want to go to Telok Kumbar, Sungai Batu and those who follow the road to Balik Pulau through that road have to go through traffic jams that sometimes take nearly an hour or two hours for us to pass. So, I propose that in planning roads in our country, there must be an integrated plan involving the Ministry of Transport, because the Ministry of Works only provides infrastructure. But if the Ministry of Transport does not have a policy on the improvement of the car industry, roads and so on, this will cause problems for the ministry in carrying out its projects. Second, I would like to ask under Item 0500 - Road Maintenance Management, I find many complaints from users which I think are not the fault of the Public Works Department (JKR), but involve other agencies, for example TNB, the Drainage and Irrigation Department, local authorities and the Water Board. This is because when they dig up the road for some reason that forces them to dig up these roads, it is then left as it is. Sometimes they only place an iron stake that we cannot see at night, and it endangers users. So, is there a mechanism by JKR in maintaining all of this? If they must dig, there must be a form that can guarantee safety, and perhaps we need to propose a committee to deal with this digging so that we can provide sufficient safety to road users. I think the problem of safety has been repeated several times because of failure to coordinate with TNB, local authorities or the Water Board and so on. Finally, involving Parit Buntar, which is under Item 21000 in P.27 - New Projects. Parit Buntar is part of the Twin Track Railway Project area, which involves two railway gates in the town of Parit Buntar. I would like to ask the ministry, whether the flyover and overpass project in the town of Parit Buntar is included in the new project allocation or whether it has not yet been approved, because if the twin track railway is completed without this flyover and overpass, we will face very severe traffic problems. So, with these three issues that I have raised, I request that the ministry provide an explanation. That is all, thank you.
Thank you, Mr Chairman. I refer to Item 61000 - Road Upgrading Works. Firstly, I would like to ask why the project to widen and upgrade the road from the town of Simpang Kampung Awah to the central town of Jengka, which has been declared as
Bandar Tun Haji Abdul Razak and continues to the Jengka 8 junction, although it was listed in the Ninth Malaysia Plan list at number 18, has been dropped. In the budget presentation and debates every year, I have raised that this road should be upgraded and also widened. This is because the population of Jengka town, which was originally 5,000, is now nearly 30,000. This road has become congested, narrow, and besides that, the road shoulders have also collapsed in many places, endangering road safety. I request that the construction of this road be expedited. In addition, from the junction in front of Jengka 18 to Jengka 23, Jengka 22 and Jengka 21 and continuing to the Jengka 13 junction, I also request that it be upgraded to provide comfort and safety to road users. This is because this road is not only connected to the town of Kampung Awah but also continues to connect to the Gunung Senyum Forest Recreation Park, which is a tourist place in our country. The second matter concerns the road built by the state JKR. I would like to ask why roads such as Jalan Seberang Temerloh to Rumpun Makmor, Jalan Bangau Tanjong to Kuala Kerdau and Jalan Jendalok have not been upgraded since the 1990s, and the repair works are only small works that do not provide comfort to road users on these three roads. The third matter concerns the construction of new roads and bridges. I thank the ministry because Route 98, or Simpang Empat Songsang to Jerantut, has been upgraded and also widened. However, what surprises me is that although the road has been widened, the original bridges have not been widened. When reaching the bridge section, the road becomes narrow and will endanger the safety of road users. Many people have fallen into the river, namely at Sungai Krau Bridge and Sungai Seboi Bridge. I have raised this several times in this honourable House.
Fourthly, the main roads in Jengka town, as a result of the closure of the Jengka Regional Development Authority (KEJORA). I see that the roads in Jengka town have not been maintained for a long time, are potholed, rutted and endanger health, and what is the role of the JKR Jengka Branch in not upgrading or repairing the roads in Jengka town. Next, fifthly, regarding the cleaning of R&R and also toll plazas, including toilets and suraus. I request that these works be looked into so that local contractors and residents can be given due attention in obtaining the cleaning work and also the work of looking after the toll plazas and R&R. Finally, I sympathise with my colleagues including the Honourable Member for Kuala Krai, who is not present, who asked me to mention why the road from Bentong to Raub is still undulating and not repaired. From Raub to Lipis and Lipis to Gua Musang, this road is extremely bad, especially during festive seasons and school holidays. If the journey is only two hours, when conditions are bad it will take five hours, and some take up to eight hours to reach Kota Bharu. Thank you, Mr Chairman.
Thank you, Mr Chairman. I wish to touch on Item 050800 concerning Federal Building Management in Sabah, especially in Kota Kinabalu near UMS. Since these buildings were occupied by federal departments, we can see that all this time they have been repairing these buildings, even though they were only occupied about three years ago. We have never seen the repairs being done perfectly.
What is the actual reason that, although the Occupation Certificate (OC) has been issued for these buildings, unfortunately we can still see many of these buildings being repaired. Therefore, what we are asking is how these buildings can be occupied when they have not yet been declared safe for occupation. Secondly, we see that bridges, especially in the Sepanggar area, are quite dilapidated and still have no alternative bridge. For example, the bridge crossing the Likas River to Taman Kingfisher, where there is only one bridge channel. If this bridge collapses, all the people in that area will be stranded and unable to... Moreover, the area there has a hospital. So what we are asking is for its construction to be expedited, but until now, although we have applied for some time, the construction of this bridge still has not been carried out. Another matter concerns roads, under Item 08600 – Road Upgrading Projects, where two days ago the Minister himself announced that a total of RM17 billion will be allocated to Sabah to repair and also build roads within 30 kilometres around the big city of Kota Kinabalu in Sabah. Can this really be planned, and have we started this planning? This is because usually when we hear of these allocations, unfortunately we do not see how they can plan, whereas JKR, both at the federal level and the state JKR, appears to be somewhat sluggish in carrying out all these projects. So, with this, that is all.
Thank you, Mr Chairman. Honourable Deputy Minister, I would like to refer to 09600 – Road Upgrading (3). Mr Chairman, I would like to raise a matter that has been left behind for a long time, namely the North-South Highway, which should have run from Padang Besar to Johor Bahru. However, a wrong decision made at that time caused this highway to be diverted to Bukit Kayu Hitam to Johor Bahru. So, as a result of the construction of that highway, we see that Padang Besar, the constituency of Dato' Seri Azmi bin Khalid himself, has fallen behind by more than 10 years compared with the development of the border at Bukit Kayu Hitam, as a result of that wrong decision. So I humbly ask the ministry to review it. At present there is already a one-way road from Padang Besar to Pauh, and it also leads directly into the Bukit Kayu Hitam highway. This road should be upgraded immediately, because, to ensure that, due to the congestion in container handling that is happening at Bukit Kayu Hitam now, these companies are shifting their attention to Padang Besar. However, the problem now is that the absence of this highway link means they face a congested situation in establishing an e-land clearance depot, or depoh perlepasan darat, which is expected to bring the best outcome in terms of economic growth at the border, especially in the development cooperation of the regional corridor as planned by the government. So, in this matter, we hope that in this planning this matter will be included, to ensure that Padang Besar can breathe again and can be implemented with the advantage, with permission, of the existing railway that we see. Then it can be planned carefully and developed at a speedy pace. Next, Mr Chairman, secondly, I would like to raise the roads that have been awarded to Class A contractors. So, according to the JKR's own planning, 10% if I am not mistaken, of these projects is given to Class F contractors with direct payment proposed. So, we request that it not be done through the main contractor involved in the project, to ensure that the
Class F contractors are not cheated in terms of payment. We hope the JKR will carry out proper monitoring so that Class F contractors, whom we know have limited capacity, mostly in financial terms, who only wait for direct payment made by the JKR to these Class F contractors. So, so far, how far has the progress achieved been, as a result of the government's intention or aim to distribute a portion of the large allocation, whether through direct negotiation or tender, that has been awarded to these Class A contractors, given a fairly balanced opportunity to Class F contractors to be involved in the construction of larger projects? Thank you, Mr Chairman.
Thank you, Mr Chairman. I would like to touch on B.27 Ministry of Works relating to 010100 and 030300. Firstly, I would like to ask for an explanation from the ministry: how many companies or projects have already been decided by the Tender Board but the letter of award has still not been issued? [Deputy Speaker (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar) chaired the Committee] Yet I understand that the LOA should be issued 5 days after the Board of Tender makes its decision. Therefore the LOA must be issued, and I understand that there is a delay and slowness in issuing the letter of award. So I would like to ask what the problem and its cause are, and what bureaucratic red tape is causing the delay? This is because, in my view, when the LOA is issued late, it means the project starts late. When the project starts late in a situation where the country is facing this economic crisis, we cannot contribute to stimulating the economy for our country. So I ask for that explanation. Is this connected with the problem raised by the Honourable Member for Arau earlier, a little. Is it related to the 10% condition for Class F contractors, which causes slowness, as if the ministry has to wait for these Class A contractors to come and meet the ministry first. Then, make a pledge of the companies that have already been selected by the ministry beforehand. Whereas previously we saw that Class F companies were chosen by the Class A contractors themselves, who determined which companies they felt had the ability, expertise and skill to carry out these projects. So if this is the cause, namely that Class F contractors have to wait for Class A contractors to come and see the ministry and so on, this causes delay. So I feel it is not right. That means in the current economic crisis situation. So I ask for an explanation from the Honourable Minister. Next, the second point relates to the government's decision to implement the IBS system, which is like a prefabricated, easy assembly approach with the IBS system pattern. In my view, the government's primary purpose is to reduce the workforce, especially foreign workers, as stated in the Treasury Circular Letter No. 7 Year 2008. However, I see that this aim has not been achieved and instead has caused difficulties and losses for contractors who have worked conventionally all this time. This is because IBS vendors also employ foreign workers. If we go and visit these IBS vendors, many of their workers are foreign workers. So the aim of reducing human labour, especially foreign workers, has not been achieved. Meanwhile, contractors who implement projects conventionally suffer losses in terms of equipment they had owned previously, which cannot be used because the majority, namely 70% of the total project, must be given to vendors.
So in my view, something that should not happen so hastily as this, changing from the conventional system to IBS. This is a reason for me that it is a very big loss, not only for the Class A contractor itself, but also for other class contractors, including Class F. This is because we will not allow Class F to remain at that level only. Now, for example, as I said, 70% goes to vendors. That leaves 30%. The government's condition says 10% goes to Class F. So only 20% remains for the contractor who does the main work to carry out the project. So what profit will be obtained? I am also informed that IBS is also expensive in terms of cost, namely an increase in cost of between 15% and 20% more than the conventional system used previously. So I ask that because it not only harms the main Class A contractor just now, but also Class F. I am saying that we also want Class F to make progress so that they can rise to bigger classes. However, if they only do ordinary work, because heavy construction is all handed over to vendors. So what does Class F do? They do light work that brings little benefit. So the ones who suffer losses are Class F, and most Class F contractors are bumiputera. UMNO keeps talking about bumiputera, bumiputera, bumiputera, but does not look at the interests of bumiputera contractors. Is there? Please...
Thank you, Mr Chairman, and also the Honourable Member for Pokok Sena. The Honourable Member for Pokok Sena mentioned that the IBS system is about 15% more expensive than the conventional one, more or less. Could you please explain a little, how can it be 15% more expensive? Could you explain a little, how the costing can turn out that way?
Yes, it would be lengthy if I were to give a briefing. It must be done through a foreign programme. This is because, among other reasons, these vendors are dominated by only a few companies. If we look at the CIDB website, they are registered with CIDB. There are only 50 IBS suppliers, only 50 vendors. Of those 50 vendors, that means 10 are big vendors. Most of them are not bumiputera vendors. Moreover, I am informed that some of these vendors are companies owned by foreign interests. So in my view, of course there is no competition in terms of that. That means they can set whatever price. If you want to take it, take it. If you don't want to, what other option does the contractor have? But for the main contractors who themselves carry out the project from the beginning, the heavy construction, then of course they can think about how to reduce their own costs. So if you want the other briefings, I will tell you later.
Mr Chairman, the reason I asked this question of the Honourable Member for Pokok Sena is that I was told. Whether right or wrong, the government proposes the IBS system because it is cheaper, while the Honourable Member says it is more expensive. That is what I asked just now. How did he make that calculation? Is it the government that is right or the Honourable Member who is right? So who is right, we have to look at the costing.
Ya, ya.
You cannot say there are so many companies, so many companies. The number of companies does not determine costing. Yes, please answer.
Wait for the government to answer. Alright, thank you to the Honourable Member for Pasir Salak. So, I want to state here that this is a loss. Firstly, as I mentioned earlier, to Class F. They cannot progress. They keep doing work that is not heavy construction. They do grass-cutting work and so on. So we just leave them sitting there. They do not rise in rank, they do not rise in grade. So in my view, this is something that should not be done. Moreover, I say that even the Class A contractors themselves do not have the expertise and skill in implementing IBS construction. This is
the reason: when they take it from the vendor, they have to assemble it, they have to use other technology. So they do not have the expertise and skill. This means that we will certainly not get a project implementation that is truly good and sound, to ensure that something bad does not happen after the building or whatever it is is completed by the contractor himself. So I also want to ask the government for an explanation: to what extent is CIDB providing courses to these Class A contractors on implementing IBS? Whereas... [Interruption]
Honourable Member, one more minute.
Yes, whereas CIDB collects a levy of 0.025% of the project value. I do not see that anything has been implemented to provide briefings and courses to Class A contractors. Then, I also want to ask about 010300 – Federal Building Maintenance. I ask how many federal buildings there are across the country and how many projects or contractor companies have been given contracts to maintain federal buildings across the country.
Next, 060500 – Toll Compensation. Does the government intend to review the toll compensation, when we want to avoid toll increases, and then the agreement ends up imposing a condition that the government must pay compensation to the concession company? So, does the government intend to review it again, because this is detrimental to the people, and the insufficient incentive or rebate offered by PLUS and ELITE recently, namely 10%. In my view, this is something that does not bring a great benefit to consumers, because of the 800,000 highway users, only 10% use it at night. Of that 10%, according to the Ministry of Works, based on a study conducted, most of the accidents or collisions on highways happen among that 10%.
The Honourable Member's time is up.
So in my view, it should be provided at all times with a rebate for all types of vehicles, including freight lorries, because this helps reduce the cost of goods, most of which are transported by lorry to reach their destinations. Thank you.
[Bangun]
Thank you, Mr Chairman. There are several matters that I want to touch on. Firstly, I want to ask, after I looked at Items 10000 and 20000, there is no item for the management of the Malaysian Highway Authority (LLM) and also CIDB. Have LLM or CIDB already been privatised, or how is it? Secondly, Mr Chairman, I also want to ask, under the same items, about the management of JKR and the management of KKR regarding the distribution of projects, because I notice that many of the same contractors receive many projects. So, if they still practise the tender and evaluation process using the traditional, conventional method, or there is already a new method, because the old method makes it very easy to collude with contractors. If the BPR (Malaysian Anti-Corruption Commission) wants to learn from me how collusion with contractors can be carried out, they can come and see me. Thirdly, Mr Chairman, this one perhaps I have an interest in. On the same matter also...
What interest does the Honourable Member have?
As a consulting engineer, many have complained to us that this should be raised in this Parliament, namely the process of approving the agreement documents for civil engineering consultants and others involved in project supervision work. It takes so long that by the time the project is completed, the agreement is still not signed. The project is complete, the consultants, architects, or engineers have not yet received payment for supervising a project. It has two components. One, payment to consultants for design work, and two, for supervision. The supervision one is usually later. This one is usually delayed, and sometimes simply left behind. Mr Chairman, I would like to congratulate JKR for having set up a branch called the Maintenance Engineering Branch. Only I want to add one matter that JKR should always keep an eye on: in recent times, flash floods have hit many parts of the country. After examination, most flash floods are caused by drains along JKR roadsides that are maintained, not that they are not maintained, but they are not perfect. I understand that the basic role of these drains is to lower the water level on the road so that it does not damage the road surface. I understand that, but at the same time these drains now have a major role in channelling...
Tuan Pengerusi.
... water coming from the surrounding areas to be channelled...
Tuan Pengerusi.
...to the JPS drain (Department of Irrigation and Drainage).
Point of order.
Yes, Honourable Member for Ledang, sit down first.
Sudah pula.
Mr Chairman, earlier the Honourable Member for Ledang said that he has a pecuniary interest. I would like to refer to 35(6). I feel that the pecuniary interest the Honourable Member for Ledang spoke of is relevant, in that he is, if I am not mistaken, a consulting expert. Therefore he cannot touch on that matter. I humbly request that it be expunged from the record.
Mr Chairman, I want to ask...
Sit down first. I am speaking to the Honourable Member. That is what I asked the Honourable Member for Ledang just now. I asked the Honourable Member for Ledang again what kind of interest the Honourable Member mentioned just now. Is this type of interest the Honourable Member has as a consultant who has done projects or advised the government, or specifically relating to what the Honourable Member raised just now.
For Mr Chairman's information, I raised this matter based on the experiences of many. I have received many complaints...
No, that is not it, Honourable Member.
...by coincidence...
Where is the benefit or interest of the Honourable Member?
The benefit is because I am also a consulting engineer, that is all.
Itu sahaja?
Yes, that is all.
It has no connection with the project that was raised.
It is the same as if a doctor for this disease spoke about...
Honourable Member, I am the one asking the Honourable Member.
Ya?
There is no connection with the project the Honourable Member just raised?
No, no.
No? So it is alright, Honourable Member. There is no connection.
No, I heard the Honourable Member say there are unpaid fees. It seems there is an interest, then.
No, Honourable Member. He...
This is very clear, because if there is such an interest, it is very serious.
Honourable Member, I understand the Honourable Member.
This cannot be allowed. If the Honourable Member says it, I believe it is up to him. If that is true...
Honourable Member, Honourable Member. I understand the Honourable Member. If a lawyer advises any company, and he says there is an interest, they discuss another company, there will be no connection with the Honourable Member at all. The project must be the right one that was raised. If he talks about PLUS's adviser, and he raises the matter of PLUS, that has a connection with the Honourable Member. Okay, please, Honourable Member for Ledang.
I will continue on the drains just now. The drains along this roadside also channel water into the large drains maintained by JPS. If JPS drains are efficient and effective, but these JKR drains are coincidentally also used to channel water, and during the flood season many flash floods occur, this can also harm the whole area. I would also like to extend my highest thanks to JKR, because my earlier complaint about the damage to the Jalan Bukit Kangkar to Tangkak toll road is being repaired using CIPR, or Cold In-Place Recycling. Mr Chairman, I ask JKR to closely monitor this repair process, because as far as I know, along this road that I travel every day, failure is caused more by the strength or compaction (with permission) of the existing sub-grade, rather than the road base (with permission) or crusher run (with permission). So I ask JKR to examine this carefully so that the same problem does not recur.
Finally, Mr Chairman, I would also like to ask the Ministry of Works or JKR to review Item 19000 - Engineering Research and Development
with a very small amount of only RM2 million. Firstly, why so small when we are moving towards upgrading JKR technically and in other respects. Secondly, what achievements have there been all this time since this branch was established. Thank you. I support.
Thank you, Mr Chairman. At the debate stage for the Ministry of Works, I seek to raise Item 81000 - New Road Construction/New Projects. The matter I refer to is the road from Kuala Krai to Wakaf Che Yeh, Kota Bharu. When the Right Honourable Prime Minister launched the East Coast Corridor and while tabling the Ninth Malaysia Plan, among the main projects in Kelantan that were announced was a new road from Kuala Krai to Kota Bharu, with an estimated distance of around 70 km. My check of this year's estimates under the Ministry of Works does not show anything about this matter. Of course I want to raise the question: what has become of the fate of this road? Does the government intend to proceed or not? In the homework I did on this proposed project, there are two proposals: either to retain the existing alignment or alignment (jajaran lama), or to start a new alignment with four interchanges, which also passes through the Machang area between UiTM Machang and Bandar Machang. So the question I want to raise is: if it is implemented, will the new alignment or the old alignment be used? This is because if the new alignment is used, the main towns will certainly be bypassed (with permission) and this will to some extent affect the economic development of the towns. However, if the new alignment is to be implemented, can it truly solve the congestion problem? As to whether it is appropriate or not to proceed, I think we have no difference of opinion, because the Prime Minister has made several announcements during his visits to Kelantan. Since this road is a main route, if one wants to travel from Kota Bharu to Kuala Lumpur, one will pass through Kota Bharu, Ketereh, Machang, Kuala Krai and then onward to Gua Musang. Secondly, regarding this project, how does the government intend to finance it?
I would like a little explanation before moving on to financing.
Ya, sila.
Thank you, Mr Chairman, and thank you to the Honourable Member for Machang. I would like to seek clarification from the Honourable Member for Machang, because the Honourable Member for Machang said he had done his homework. This new road, which has been approved, will start from Kuala Krai, go through Machang and then on to Kota Bharu. I have heard some reports that the section from Machang to Kota Bharu will be implemented first, while Kuala Krai-Machang will be postponed. Does the Honourable Member for Machang agree if I say that the travel problem from Kuala Lumpur to Kota Bharu has its bottleneck between Machang and Kuala Krai, not between Machang and Kota Bharu? This is because from Machang there are many dispersal roads, roads that lead to Kota Bharu with many junctions for access. However, from Kuala Krai to Machang there is only one main road. So, even if there are phases in the construction of this road, does the Honourable Member for Machang agree if I say that the Kuala Krai to Machang phase should be prioritised to disperse some of the vehicles from Kuala Lumpur-Kota Bharu and vice versa. Thank you.
Thank you, my friend from Kuala Krai. Mr Chairman, there is no doubt that in terms of importance and priority, the route between Kuala Krai and Machang must be given special attention, because that is where traffic slows (with permission) during the festive season. Congestion will occur from Kuala Krai all the way to Kota Bharu over a distance of around 70 km. So, the question is: how does the government intend to proceed with financing this project? Will it be government funding or PFI funding? Thirdly, what I want to raise, still under the same road, is that I have previously raised in this august House whether its design is single lane or double lane, two lanes going and two lanes returning. At that time, the Minister of Works' response was that, because the government would make decisions under the Ninth Malaysia Plan, certain projects would be downsized. The minister's answer to me then was that this project might proceed but with one lane going and one lane returning. This affects the smoothness of traffic and I consider this a fundamental matter. I ask the ministry to provide an explanation. Fourthly, I have received information that if this project proceeds, it will be carried out through direct negotiation with Konsortium Logistik Berhad. It is reported that a letter of intent has already been issued by the government because this company succeeded in obtaining bank support. If the government intends to proceed with this project through deferred payment with funds of RM2 billion which they have obtained. Tabung Haji holds 10% in it, in addition to individual holdings in this project. However, even if Konsortium Logistik ultimately obtains this project, I ask the ministry not to relinquish its responsibility entirely, especially in determining the participation of local contractors. At the very least, if the Kuala Krai to Machang route is allocated to local contractors, while Machang to Kota Bharu can be continued by the said consortium. The development of the four interchanges at Keroh, at Machang and beyond can be started first. This is because the state government has no problem in terms of cooperation in land acquisition if it is needed. That is under Item 81000. The last point, Mr Chairman, is that when I drive from Machang to Kuala Lumpur, I notice that this aspect relates to Item 08500 - Road Safety Project. There are several routes considered fatal routes (laluan maut) because of the high number of accidents, fatal accidents I mean. From Kuala Krai to Gua Musang, if I check the Ministry of Works website, it is clearly stated there at kilometre 128 to 130, kilometre 150 to 152, kilometre 154 to 156 and several others. There are five main points. If the Ministry of Works acknowledges that these are areas of fatal accidents, I notice there is one aspect that has been neglected there, namely adequate signboards, when we are approaching or nearing these fatal routes. I suggest that more visible road signs (with permission) be installed at these locations. Likewise in the area from Machang to Kota Bharu. Based on the current route, Mr Chairman, kilometre 29, kilometre 34 and kilometre 59 are areas identified by the Ministry of Works as dangerous routes. Again, the issue is adequate signboards. I understand that aspects of road accidents, apart from driver behaviour and mechanical faults, also involve road design. Since this falls under Item 08500, I seek to present or raise a proposal that more easily visible road signs be installed.
The Honourable Member has one more minute. Okay, thank you, Honourable Member.
Clarification. Just a little on the matter of - just a little, Honourable Member...
Your time is up, Honourable Member, your time is up. If I give the Honourable Member, I will not let him answer again.
Terima kasih.
Thank you, Mr Chairman. I raise two matters. For the information of the Deputy Minister who is following this debate, I thank you very much.
Your time is up, Honourable Member.
I also hope for a more comprehensive reply so that we can jointly fulfil our responsibilities, especially in terms of providing better infrastructure for the convenience of the general public. Thank you, Mr Chairman.
[Bangun]
Pontian?
Patience, patience. Sit down. [Laughter] Thank you, Mr Chairman, for allowing me to also debate at the committee stage on Head 27 for development 27. I will touch on just two or three matters in a brief manner, namely P.27 - Items 08200, 08230, 11800, 11803. They relate to developments in the Putatan Parliamentary constituency, and I have no intention of extending beyond that. Mr Chairman, for the information of the Honourable Deputy Minister, I have also raised the same matter before, that the Putatan area is the gateway into Malaysia, into our country. The second largest gateway is the Kota Kinabalu International Airport, and as far as I know, the Honourable Deputy Minister also has the Kuching International Airport. Yes, it is the same, yes. The Honourable Member understands this matter. So far there have indeed been efforts by the government through the Ministry of Works to improve, beautify and enhance the Putatan area. So, thank you for the project to widen the road from Jalan Kepayan to Petagas, which is already being implemented and indeed looks very nice. Now, what problem was raised during the last election, Mr Chairman, which has indeed become something that the people, residents and voters in the Putatan area keep voicing, is that the traffic congestion on that road still persists. Especially the road traffic from Kota Kinabalu heading to the same place, namely the Petagas Bridge, Honourable Deputy Minister. That is where it becomes a bottleneck. So people who use this road curse, Mr Chairman. They curse the Member of Parliament, not the government. Why was this not raised with the ministry? So I hope the Deputy Minister will help, because although the private sector's efforts under BOT to build this multi-level road are being implemented, it has stopped just at the riverside. So this river, this narrow bridge, becomes the bottleneck. So my question is, I hope the ministry can look at this matter seriously, because if it is not addressed promptly, it will become anger among the people. So perhaps in the coming election, I hope that the people's satisfaction with our government will not change. I once asked a question at the first meeting of this session, whether there is an alternative road that the government will plan? This is because in the planning of that area there is indeed a road that will be built, a road reserve by the sea. So the answer so far is that there is no government plan yet. So I hope that answer can be developed into a fairly significant, functional approach so that this can be implemented
The reason given in the replies was that there is an alternative road, namely the old road. There too, there is traffic congestion during peak hours. So I hope this road that will connect to the state of Sarawak, called the Pan Borneo Highway. I have already criticised the designers, the people who design this road. Look at the Pan Borneo Highway, it is a highway, but within a distance of 100 metres, I do not know how many hundreds of road junctions there are on this Pan Borneo Highway. Because this road runs parallel with the railway (landasan kereta api) that is now being built, this becomes a major problem, because I understand the railway line will be fenced. So what about the junctions leading to villages, to business places, commercial places and so on? So I hope the ministry can look at this matter with an appropriate design. This is because at that location, Honourable Deputy Minister, there are also schools where schoolchildren will cross the road. So there is only one place with a footbridge, which is opposite Kampung Pitagas, but in Putatan, in the town of Pekan Putatan, there is no place for the public to cross. So I hope this can be looked at, and also that the design of this road includes a U-turn in front of places where many people gather, the busy market places where people congregate, and cars park along the edge of this highway. This makes the road narrower. So my suggestion is that the ministry go down to the ground, that the Honourable Minister and Deputy Minister go down to the ground to see the problems faced by the community there, so that this road might be widened and a suitable parallel road built. From the Petagas Bridge to Kem Lokawi, or also building an alternative road from this main road through the village, coming out at Kem Lokawi. That is a proposal I have already put forward, because there are only small roads that will be implemented like flyovers. So I think the ministry must look at this if we want to take to heart the comfort of the public in this area. This is used by drivers from Papar, from Beaufort, in Sipitang, in Sarawak, in Limbang. All drivers from Sarawak use only this one road. So I hope the ministry can look at this matter seriously. So I will not repeat this matter again, because if the Honourable Member for Kinabatangan is already angry that his request was ignored, then I too do not intend not to bring this matter up. But I will press, press, press until the ministry is sick of my pressing. I will do this if there is no action. I will do it again and bring it and bring it until you are sick of it. So I hope government officials can take this matter seriously. One more matter, Mr Chairman, regarding the item I touched on earlier, namely 11800...
Honourable Member, you have one more minute, Honourable Member.
Can that one minute be doubled, once? This is a request.
Be brief, Honourable Member. Is this the short one you mentioned earlier?
Yes. 11800 - Repair and Renovation of District Offices. Because Putatan is a new district, having only just been announced, this district office must be assisted. Because the amount of RM6,500,088 is rather small, I seek an explanation from the ministry on where this money will be spent. If possible, please spend a little to enlarge the Putatan District Office, because it is too small.
So this Member of Parliament operates his office from his own home. I ask the ministry to look at this matter so that the space of the Putatan District Office is enlarged, because it is too small. I think the Putatan District Office is the smallest in this country, and I hope the ministry can go down to the ground to see the problems faced by officers, especially federal officers. With that, I thank you, Mr Chairman, for giving me the opportunity. Thank you.
The Honourable Member for Puchong.
Thank you, Mr Chairman. Mr Chairman, allow me to refer to B.27 - 060500 and I will also refer to P.27 - 08500. Firstly, I would like to ask about the agreements made with the concessionaires for highways. Mr Chairman, what is clear is that when concessionaires build highways, they use a lot of land. So, the government does enter into or carry out a process in which land is taken back, acquisition is done, for the purpose of enabling those highways to be built. Apart from that, there are many costs involved that should be taken into account in the process by which an agreement is drafted with the concessionaire company. Here I see that for the Puchong area, there is the LDP agreement, the Damansara-Puchong Highway, for a period of about 30 years. What is clear here is that the government only last week, the Minister agreed, the government does not have any power under the existing agreements to ensure two things. One, that traffic conditions are usually controlled, and two, with regard to tolls. I want to ask here, why was it possible for an agreement for 30 years in which a concession company was permitted, and I read from the figures given to me by the ministry, RM15 billion. Did we agree to sign an agreement with a third party without us obtaining any power to control traffic, to control tolls, and furthermore, why was the agreement not regulated under the OSA Act. Is this not a situation in which that Act is used to protect the conditions in the agreement. What if there are elements of corruption, corruption in those contracts. 30 years given to a third party. A company permitted to make billions, but the government has absolutely no power to exercise control. I want to know whether the government is now willing to accept that all these agreements in the past were a mistake on the part of the government, that is one, and what about the contracts or agreements in the future. Is the government prepared to conduct a study to ensure that agreements of this kind, which only serve the interests of the third party, the toll party. Agreements such as these should include conditions that enable the government to ensure that these toll parties cannot do as they like, it's there. Will any safeguards be included in agreements in the future. This is also regarding...
May I ask for clarification?
Yes, thank you.
Thank you, Mr Chairman, thank you, Honourable Puchong. I would like to ask the Honourable Member, apart from our country Malaysia, which implements privatised highway projects and collects tolls to recover the very large investment by companies that handle the construction of these roads, apart from Malaysia, which the Honourable Member has described as having many problems with controlling traffic, and cannot control in terms of excessively high collection and so on. Are you aware, I believe perhaps the Honourable Member also knows that in other countries too there are projects like this, namely tolls and highways. From a little experience when I went abroad,
I found that these tolls and also highways built like this cannot, cannot...
Summarise it, Honourable Member, he only has 10 minutes, Honourable Member.
... cannot guarantee freedom from traffic congestion, and they also take a long time to recover that investment. Otherwise, how could investment be made for the comfort of the people. Are you aware that this also happens in other countries?
Thank you, Honourable Pasir Salak, for that question. I agree that other countries also have systems in which collections are made for the use of roads, especially highways and so on, but it seems that here it is like this. Let us look at Puchong, we do not need to go far. My parliamentary constituency, where alternative routes exist where the existing roads could previously be used by people who do not wish to pay tolls. Previously they were public roads, public roads such as Jalan Puchong, for example, those are public roads. Especially in other countries, before a toll road project is carried out, the government requires and ensures that alternative routes are available so that if the people feel burdened by toll payments, they can use these alternative routes. But in Puchong, there are none. All roads to Puchong, all, pass through toll roads. I ask here, I agree with development, fair enough. What about the people in their own country who were supposed to have public roads, which previously, when they bought houses, were stated as public roads, and now there are tolls. We have no choice. What should we do? Here I state the failure of the government to ensure that the people are not pressured by toll projects of this kind. I want to ask here, why can we not have agreements with more conditions that allow the government to take action. Here I want to ask the next question, Mr Chairman, whether the concessionaire, especially in Puchong, will increase tolls again in the near future. I hear that they will, and I want to hear directly from the ministry whether the ministry knows and I also want to know to what extent these tolls will be raised. Does the government have any power to ensure that these tolls are not raised to a level at which the people cannot pay. Does the government admit defeat, apologise, 20 to 30 years we have sold your land, sold your roads, we cannot do anything. This government must be responsible... [Applause] There, Mr Chairman, we ask questions also regarding alternative routes. Mr Chairman, we do not need to go far, look at the situation in Putrajaya, I have stated it several times. Why is there no toll on the major road there? Why does Puchong, which has three major roads, all have tolls? So this question we must ask. When the government makes an assessment, why is there not one body that looks at all of this? If there are to be tolls, two tolls across the whole country, okay. Why Puchong, why is Puchong oppressed? Perhaps because the Deputy Minister does not live in Puchong, does not know. You come and live there, I will pay your one month's rent and your family's. You can experience how it is to pay tolls every day.
Don't want, don't want, want?
One more minute, Honourable Member.
Satu minit?
One minute, please.
Not yet started... [Laughter] If possible, in the manner of questions. I move on, Mr Chairman, to P.27 08500 - Issue
Security. Here I think there is a new issue that has not been mentioned by anyone before. I want to ask the Honourable Deputy Minister, what about police and ambulance vehicles? Are police and ambulance vehicles also required to pay tolls? That is an issue that I think is an important issue, especially in emergency situations. What about a special lane for the Police and also for Ambulances, is there or not? The agreement clearly states, and I will receive this agreement in January, so the answer given must be accurate. Is a provision made in the agreement for... I want to ask a question, is a specific provision made for the police, ambulances and also the fire brigade. Mr Chairman..
The Honourable Member's time is up already.
Finally. Regarding the issue of safety on highways. Mr Chairman, recently I learned that there have been several serious accidents on roads, especially on the North-South Highway Project. The problem is that there is not enough time for an ambulance or the police to arrive, which results in death and serious injury, perhaps in half an hour to maybe even an hour. I want to ask here, does the government in those agreements make a specific provision whereby safety facilities must be provided by those concessionaires, not relying on the government, for example, ambulances from government hospitals and so on. Are there conditions stating that the highway operators, especially on the North-South Highway because the place is remote, ambulance helicopters and so on, is any provision made to generate safety in that regard. Mr Chairman, there is no time left. Thank you.
The Honourable Member has already spoken for more than one minute. The Honourable Member for Sibuti spoke three weeks ago.
Thank you, Mr Chairman. I would like to also take part in the debate in the Committee of Supply 2009, Item 09270 - Repair and Resurfacing of Roads. First of all, I thank the government for completing the coastal road in the village outside the town of Miri, straight to Tanjung Batu, Bintulu, which was completed in 2007, where the former Minister of Works officiated a bridge on that road and said "Ayoyo, this road is slippery like ice cream"... [Laughter] Because of the words uttered by the former minister concerned, all vehicles from the Bintulu division to Miri used that road and also opened the way for farmers around such roads, bringing their produce to the town and small towns of Bekenu and Niah, and also heavy vehicles such as timber lorries, lorries carrying heavy loads, stone and containers used that road. So the old road from Bintulu to Miri is very rarely used. Therefore, at present, within a year, that road has become like ocean waves, where the vehicles using it have frequently been in accidents and need to be repaired. The loss of life due to the road being like waves is not less than ten fatalities, and not less than 30 serious accidents. Therefore, I request the Ministry of Works to increase the allocation, where in this allocation, only about RM1.6 billion is allocated to the state of Sarawak. If possible, because the road from Kuching to our area needs to be repaired and resurfaced again. Therefore, we also request that the ministry repair the river banks along
this road route, because soil erosion is also occurring and this road, on the coastal road not far from the South China Sea, has approached this road about 30 meters, the road needs to be protected as quickly as possible. We are afraid of losing this road within a year or two because of the monsoon rains. Secondly, I want to touch on 09240 - Inspection and Repair of Bridges. On the old Miri-Bintulu road, about 400 kilometres, there are two bridges in my constituency, Sibuti, the Sibuti Bridge and the Suai Bridge, which were built about 30 years ago. I suggest to the ministry that these bridges be inspected. Let it not happen that something occurs to heavy vehicles crossing these bridges, and only then we take action, which will cause hardship for residents along that road to cross from one side of the river to the other side area. This is very important because it is in this area that there is extensive cultivation of oil palm, which uses land transport. I return to roads, repairing and resurfacing roads as before. We request the ministry to provide an allocation to the Public Works Department (JKR) Miri division to expedite the repair of these roads, because the relevant party, when we met with the JKR Miri, they stated that they have not yet received an allocation to repair or resurface the roads I mentioned earlier. I also appeal to the ministry, we in rural areas must not be left behind. Help us, please help us, so that the products we obtain from agriculture, fisheries and others can be marketed to towns such as the small town of Bekenu, and the small town of Niah and onward to Miri. This is because tourists from nearby cities such as Bandar Seri Begawan, Brunei, often come to that area to buy agricultural products and visit their families who are in the Sibuti area. In closing, I hope the ministry does not waste the hopes of rural people to obtain good roads like those in the towns. Thank you.
Thank you, Mr Chairman. I refer to Item 08260 – Upgrading and Rehabilitation of New Projects and 08600 – Road Upgrading Project. Once again I want to ask a question that has been raised many times, namely why no new roads have been built in Tawau under the Eighth Malaysia Plan and the Ninth Malaysia Plan. I have previously spoken on this problem in Parliament and also raised questions about upgrading to widen Jalan Sin Onn in Parliament before, but I am very dissatisfied with the written reply from the Ministry of Works (KKR), supposedly no need to answer this question because the matter has been handed over to the state government. I think it is not difficult to answer. We only want to know whether it will be implemented or not. It seems the ministry is very keen to pass off its responsibility for this problem to another party. Does this mean that under both the Eighth and Ninth Malaysia Plans there is no allocation at all given by the ministry to Tawau through Sabah to upgrade existing roads or build new roads. Does this mean that for this 10-year period the people of Tawau depend on the state government to build or upgrade roads? Mr Chairman, I ask this important question on behalf of the people of Tawau who voted me to Parliament and are certainly entitled to know why no new roads have been built over the past 10 years although there have been many proposals submitted by the Public Works Department (JKR) in Tawau. Do not tell me that the proposals documented by the professional staff of the Tawau Ministry of Works seemed to fall on deaf ears or that perhaps there are many other mega projects. Do not forget, there are also many 'white elephant' projects in
other locations in Malaysia that should be given more attention and allocation by the ministry. Mr Chairman, for the information of the House, the Kalabakan-Sepilok road is not in the Tawau area but in the Kalabakan area. What the people of Tawau want is to build a new road or upgrade as an access road within a distance of eight to 10 kilometres from the Tawau town centre to reduce traffic congestion. I hope the ministry does not treat the foot when the head is aching... [Laughter] For the information of the Chairman, the tax collection from Tawau is the second highest in Sabah and Tawau is the third largest city in Sabah. Tawau should be given priority in the mainstream of national development in terms of infrastructure development, especially roads. We deserve better treatment than this, Mr Chairman. Road development will bring better communication between people and more efficient transport of goods for the trade sector, which will certainly help develop Tawau as a regional centre both for trade and tourism. The ministry may be able to save some of the allocation for building roads in Tawau, for now, but that is only for the short term, whereas in the long term Tawau will suffer great losses because it does not have sufficient road infrastructure to seek big profits, regional centre development, trade and tourism. Therefore, I appeal to the minister to review the decision to neglect roads in Tawau previously. Do not save a little now and lose big later. I have also submitted an urgent and high-priority proposal in Tawau, namely to build or upgrade to widen Jalan Sin Onn, especially at the front of SJKC Hing Hwa and Pasar Sin Onn, and surrounded by five housing estates with 40 thousand people using that road. I have obtained information from the minister who is now visiting Sabah, that an allocation of RM17 billion will be given to develop Sabah, but what would be wrong with widening just 1 kilometre of Jalan Sin Onn, which may need an allocation of only about RM1 million to RM1.1 million. Here I also appeal to the ministry, please list the roads to be built or upgraded from that RM17 ribu so that the people of Sabah are told of any proposals that will be carried out. There is also a proposal to build two pedestrian overhead bridges for the safety of school pupils, although Lahad Datu is a smaller town compared with Tawau, yet there are pedestrian overhead bridges for students in Lahad Datu, but Tawau has absolutely no pedestrian overhead bridges. I would like to press once again that the minister or ministry state specifically when the above projects will be implemented. Thus, that is all, thank you.
Talks a lot.
I will only take two minutes, Mr Chairman.
‘Ranom’.
Alhamdulillah.
Tenomkah Ranau?
Tenom.
Tenom, Tenom, my apologies.
Praise be to God. Thank you, Mr Chairman. I would also like to raise two or three matters at this Committee stage, namely under Item 08230 – Construction of Bridges (New Projects).
The first concerns the bridge from Kampung Nantanduan to the Sabah State Agricultural Park. I note that at one time the Public Works Department (JKR) carried out a study and also drew up a plan to build a bridge linking to the Agricultural Park, but Mr Chairman, up to today the project has still not been implemented. The same applies to the bridge at Kampung Peal, linking Peal Seberang. I have been informed by the Public Works Department that the proposal to build a bridge between Kampung Peal and Peal Seberang will be implemented, because we see that Kampung Peal and several surrounding villages are located in the small district of Kemabong. I believe and am confident that once the bridge linking Peal and Peal Seberang is completed, it will make it easier for villagers to deal with the central administrative centre, because these villages are located in the small district of Kemabong. Mr Chairman, likewise there is the upgrading of the Kampung Ponotomon bridge. I note that the JKR has upgraded the road to Kampung Mandalon and several bridges have been upgraded, but unfortunately at Kampung Ponotomon the bridge is still in the condition of an old bridge, a Bailey bridge.
So several bridges have been built and only one bridge remains that has not been upgraded. I hope the ministry can look into this matter so that it can be upgraded. Mr Chairman, the second matter concerns Item 08600 – Road Upgrading Project. I have repeatedly raised this in several previous sittings of Parliament, namely concerning the upgrading of the Ulu Tomani road, which involves several villages, namely Kampung Bakuku, Tinura, Mangunsop, Melutut and other villages. Also the upgrading of the Kampung Tilis road, which we see as the main roads used by villagers as their access routes to transport their agricultural produce to the town. The road is currently in gravel condition. So I hope the ministry can upgrade these roads, because they are very important to the villages concerned, especially for children going to school. During the rainy season these children find it difficult to get to school because the road conditions are so bad and slippery. Mr Chairman, I would like to express a thousand thanks to the Honourable Minister, who during his recent visit announced an additional allocation of RM17 billion. I would like to ask, Mr Chairman, that the ministry of the Honourable Minister, in using this RM17 billion allocation, I hope that some of the infrastructure in the Tenom Parliamentary constituency can be upgraded as I said earlier, namely roads and bridges, because in Sabah we see that most roads are still in a dilapidated and bad condition. There are many more roads that are still in red-soil condition. Mr Chairman, I would also like to ask the ministry about giving priority to projects in Sabah, especially in interior areas such as my constituency. I would like to know what mechanism the ministry uses to coordinate with the JKR at the state government to coordinate and give priority to the main projects to be implemented, especially in the coming budget or in the Ninth Malaysia Plan. I think that is all, Mr Chairman. Thank you. I beg to support.
In the name of Allah, the Most Gracious, the Most Merciful, peace and blessings of Allah be upon you. Thank you, Mr Chairman, for allowing the debate at the Ministry of Works level this afternoon. I refer to Items 08600, 087000, 08800 and 092300. Mr Chairman, for the information of this honourable House, during the debate in this House, I thank the ministry for answering all the matters I raised, especially those in the Jerai area, through the ministry's written replies. Recently I mentioned matters related to
safety features. When we enter the Jerai area, we find a very narrow bridge built in the 1970s. Two weeks ago, when I returned to the constituency, I found that guard rails and road barriers had already been installed to ensure safety, even though the ministry's reply said there was no allocation of RM200,000 to build two bridges in my constituency, which are still the bridges built in the 1970s, whose roads have already been upgraded. Thank you for that reply, but it is an obligation for us and for all of us to keep questioning matters relating to public works development in the Jerai area. As for the upgrading project involving the Gurun–Sik Highway, I understand I have mentioned several times in this honourable House the matter of U-turns. Yesterday I visited a friend of ours who was involved in an accident because this road was not managed properly, and the local community had to open private roads, thereby compromising the safety of road users, because the JKR or the ministry did not take into account the people's demand to request a short-cut road, since usually, decades ago, the people used this road to go to town and to school. When the highway was built, the people naturally had difficulty because they had to take a long detour and turn back. So the people chose to take the road, to cut through or open their own routes, resulting in accidents and so on. I request the ministry to review this matter. Second, on the same highway, also under the project of Iswada Sdn. Bhd., I have met the officer two or three times regarding the entry and exit slip roads leading into the village. I understand they still use an approach with a rather steep road, whether descending or ascending to the highway that has been built, which is causing accidents to increase. We ask the company, with the insistence of the ministry, that the entry and exit slip roads must follow a safer design, because the road has already been upgraded to a highway, so vehicles pass at very high speeds. Then I also mentioned the matter of Item 09270, with the bridge, building a footbridge, Item 09200, a footbridge built in 2002. Up to now it has not been used by either primary or secondary schools, because it is far from the primary school and far from the secondary school. Although in my view they built it to be at the midpoint between the primary school and the secondary school, neither has been used by secondary school students, who go to school by motorcycle, while primary school pupils find it difficult to climb such high stairs, so that eventually I found the footbridge has become a white elephant, not used by any party. Then regarding the issue of the drains or stormwater channels built for the new highway at Jeniang, it was found that the company did not manage it properly, causing flash floods. Every time it rains, the town of Jeniang, the route to Sik, faces flash floods because the drains are not cleaned properly and the old drains are still being used, with a rather narrow capacity, causing water to overflow onto the road and accidents to occur and so on. So I request the ministry to look at public works development, major roads and main roads throughout the Jerai Parliamentary constituency, as well as the Gurun to Sik highway route, so that their rehabilitation is expedited because of the accidents and so on. Thank you.
Thank you, Mr Chairman, for giving me the opportunity to take part in debating the items at the Committee stage. I will move on to several items concerning roads in Sarawak. Item 09230 – Bridges, Item 09280 – Construction of Roads, Item 09800 – Road Construction, Item 09260 – Road Upgrading (II). I would like to ask the ministry about several roads in the Kanowit Parliamentary constituency, which are known to have been included in the plans of the Eighth Malaysia Plan and the Ninth Malaysia Plan, but so far most of these roads have shown no sign that they will be built.
One is the Hulu Macan to Hulu Poi road, which every time we are briefed by the Resident's Office or the District Office, is already in the plan and allocation has already been given. Also the Rascom Naungun to Rascom Jugau road, which, if I am not mistaken, has an allocation of RM50 million, but now its construction has stopped. I recall that perhaps only about 11 kilometres have been done, while the remaining perhaps 17 or 20 kilometres still need to be built as quickly as possible, because this is a very long road that provides access to hundreds of longhouses in Hulu Sungai Ngemah. Another road that is controversial now, and very much talked about in my constituency in the Kanowit Parliament, is the Poi to Ngungun road. This is the road that was supposed to be built in 2007, but in 2008 it lost its allocation, as I was told by the JKR. This road may be in the region of 17 kilometres with an allocation of RM35 million. Not so much, but I understand that the allocation no longer exists. Although compensation for the land, fruit trees and crops has already been paid, construction has not yet begun. Another very critical project is the bridge across the Kanowit River to link the Majau road to Poi. This too has been allocated in the region of RM30 million, as I understand, but this bridge has still not been built. I would like an explanation from the ministry as to when construction of all these projects will begin. Another issue that is often raised, which I saw recently, is very disappointing. I returned from the Bakun area last week, and the Bakun road is a federal road from Bintulu to the Bakun Dam. Looking there, the road is now very bad, full of potholes, and it is well known to the public that this is due to timber lorries that are very heavy using this road. If we look at these lorries, they do not have registration numbers. I would like to ask the ministry whether these lorries are permitted to use the Bakun road, because it is very dangerous and causes a lot of damage to this road, which causes discomfort to us in using the road. I would like a clear explanation from the ministry, so that if they should not be using these roads, in fact these timber companies have their own roads that are not tarred. But perhaps they take the opportunity to use the Bakun road, which is nice and already tarred and gives them more comfort in transporting timber to the camps. So I think that is all I wish to raise on this occasion. Thank you.
Thank you, Mr Chairman. I would like to join in debating Head B.27 – Ministry of Works. Before mentioning its items, I note that this ministry is experiencing a very drastic reduction in allocation. For 2009, the total allocation is about 40% less than the previous year. I would like to know the rationale for this reduction, because this important infrastructure development drives the economy in non-main towns. Under Item 61000, many economic activities will become difficult or are expected to be disrupted as a result of the reduction in allocation for the construction of new roads, including new projects, which will experience a multiple reduction in allocation compared with the previous year. Likewise, new road projects worth more than RM1 billion will be cut to 50% for next year. I expect this drastic reduction to result in stagnation of activities at the grassroots level. However, I am worried that those who will bear the adverse effects of the reduction in these projects are the federal roads that cross rural areas, interior villages and kampung. I give the example of the construction of the four-lane road from Taiping to Banting in Selangor, which has been delayed because of developers or contractors who are unable to provide funds to implement this project. If it is true that the project mentioned
is to become the West Coast Highway Project and is also hoped to be extended to Melaka by crossing the coast of Negeri Sembilan, then that project will certainly also be delayed. The development process of almost a quarter of the region covering the West Coast will continue to remain in the old rut because of the delay of this project in the future. Within the west coast coastal region there are at least various major and important economic areas such as Port Klang, the tourist area of Port Dickson, KLIA and Melaka itself, which are located within the west coast region. Mr Chairman, the strengths that exist on the West Coast, which in my view have not yet been sufficiently explored and developed as major economic activities, include small ports where traditional trading takes place between Malaysia and Indonesia through barter trade. Small and medium-scale import and export activities, such as timber products and agricultural produce, are economic activities that contribute to the income of the community and economic development in several parts of the west coast. I would like to mention briefly a stalled project, where the shortage of allocation will result in this project not being implemented, such as the upgrading project from Jalan Sepang to Bukit Pelanduk, Negeri Sembilan. Although this issue has been raised in the State Legislative Assembly, the reply was that there was no allocation from the Federal Government under the Ninth Malaysia Plan, even though this project had been reported under the Eighth Malaysia Plan. There are also projects that need to be mentioned, for example the bridge construction that has been abandoned because the contractor could not continue due to finances, particularly the project at Semerah, Muar, as informed to me by my friends. To complete this project, allocation or expenditure equal to that of the original project is needed to continue so that these bridges can be completed. Also the upgrading project from Sepang to Bukit Pelanduk that I mentioned earlier, and also the road upgrading project from Pasir Panjang, Negeri Sembilan to Linggi, which was supposed to be completed this year. So far only 50% has been completed, covering only 22 kilometres, which will result in delays, and it was found that the contractor, Hata Jaya Timur, has run short of funds to complete it and has applied for surplus allocation to complete this road. So Mr Chairman, the shortage of allocation for this ministry has resulted in several projects being stalled, and I request that this amount be increased, especially so that leakages and corruption cannot take place. I hope the ministry will give a clear indication of whether it is prepared to provide sufficient funds so that these projects are completed in the expected year. Thank you.
Thank you, Mr Chairman. I would like to touch on Item 08500, which is the Road Safety Project. I raise the Batu Pahat – Ayer Hitam road, which has now become a two-lane route. However, the Batu Pahat – Ayer Hitam route is a road with kampung and drains on both sides, which poses some safety problems, because the two-lane Batu Pahat – Ayer Hitam road actually has no divider. So when a car from the left wants to turn right, collisions often occur, because cars using these two lanes are fast. So for that reason, I understand that there was an allocation approved earlier but up to now it has not been implemented. I do not know the cause or what the problem is, but what I understand is that it is because of a contractor problem. However, the frequent accidents that occur create a problem, because on both sides are villages, which in Johor are well known for drains; the villages are called all sorts of drain names.
So cars come out from the left and right. If this problem is not resolved, especially at night, when they want to come out from the left and turn into the right while cars are travelling fast because the road has two lanes, this is very dangerous. That is why I hope this matter can be given immediate and urgent attention. The second matter is the problem of this bridge, namely 31000 - Construction of Roads and Bridges (New Project). I hope the application has already been submitted many times, namely the bridge at Senggarang, mainly for the route from Parit Karjo, the Parit Karjo junction. Because this bridge is high, people wanting to exit from the Parit Karjo route cannot see cars coming from the road ahead because the bridge is too high. [Deputy Speaker (Datuk Ronald Kiandee) chaired the Committee] So an application has been made for the road in front of Parit Karjo, the junction at this bridge, to be raised so that we can see cars coming from the front. So I hope this matter can be expedited, because this is a problem that is not only related to the matter I mentioned earlier, namely 08500, which is Road Safety. This is because the system is what causes it to need attention so that road accidents like these do not happen. Another matter that should be given attention here is the road between Batu Pahat and Pontian. We hope that under the same heading and the same item, because the road between kilometre 125 and 116 on route FT005, from Kelichap to Kores, is a hilly and winding road. So it is hoped that the government can give attention to straightening this road, because this road is a busy road, mainly the route from Batu Pahat to Pontian via the inner road. So when this road is hilly and winding, many accidents occur, and that is why we propose that the route from kilometre 125 to 116 - FT005 be straightened. Finally, I would like to touch briefly on Item 060500 – Toll Compensation Payments. I have great sympathy for my friend from Puchong earlier, regarding the problem of there being no alternative route. I agree that perhaps this matter should be given attention, and what is more important to me is the matter of this toll discount. I hope that this toll discount should apply to all routes, not just certain routes. Finally, if we look at comments from the public, it is clear that this discount is more of a cosmetic measure, namely at certain times. So it would be better for us to make it 24 hours. [Applause] Otherwise, people say this is cosmetic and has no benefit at all. So I hope this can be given attention, namely for all routes, and not only at certain times. Mr Chairman, thank you.
Thank you, Mr Chairman, I will be brief. The first matter: Item 81000 – Opening of an Access Road from the SILK Highway through Phase 7 Bukit Mewah is a request from residents of eight housing areas in Bukit Mewah. This is because they have to use a long route and must pass through the Bukit Kajang Toll at a toll rate of RM1 to return to their respective taman, over a distance of 8 to 10km, and it takes at least 15 minutes. Currently only an exit road can be used by the residents in the surrounding area, and this problem has persisted for 12 years. With the access road opened, residents of Bukit Mewah can save on petrol expenses estimated at RM3 and do not need to pay RM1 in tolls. So RM4 can be saved in one day. With the opening of this road, the traffic congestion that often occurs on Jalan Bukit can also be reduced, especially in front of the Kajang Commuter Station, which often experiences congestion at peak hours. I have been informed by MPKJ that the Ministry of Works (KKR) has rejected the proposal to open the access road. I am here requesting an explanation from the Honourable Minister as to why the proposal to open the access road was
rejected. This is because the comfort of residents must be prioritised and not the profits of concession companies. The second issue is also regarding the construction of the SILK Highway. The construction of the SILK Highway has caused residents of Taman Kajang Utama to have to take an extra 4km each time they enter and exit their taman. A tunnel was agreed to by a former Minister of Works when he officiated the operation of the SILK Highway in June 2004. However, after four years, the tunnel has still not been built because it has not yet received an allocation from the EPU. As a government that is sincere, the ministry should ensure that all promises made by a minister or former minister are fulfilled. I would like to ask what efforts or steps will be taken by the Minister now to ensure that the tunnel will be built as soon as possible. The third matter concerns Federal Route 3215 under Item 60000. Mr Chairman, Federal Route 3215 was gazetted in 1996 and published in the Gazette in the same year. However, after 12 years, this Federal Route still has not changed. This road is indeed substandard, and for the most part there are no street lights and no signboards that are followed. Why has this road not been upgraded all this time? There is a very serious traffic congestion problem, the road surface is uneven, and the road signs are not followed. I ask for the Minister's explanation: when will this Federal Route be upgraded? The final matter concerns Jalan Utama Serdang Raya under Item 20000. Jalan Utama Serdang Raya is a road that is very congested. As an effort to overcome the traffic congestion on Jalan Utama Serdang Raya, a multi-level junction is being built near Wisma SSP. However, the construction work on the junction has been halted for a long time. I would like to request an explanation from the Minister as to why the construction of the junction was halted and when the construction of the multi-level junction will be completed? That is all, thank you.
Thank you, Mr Chairman. Thank you, Mr Chairman, for giving me the opportunity to take part in the debate at the Committee stage. I refer to Item 09800 - Construction of Highways. Mr Chairman, here we can see a very large amount, namely RM1.3 billion for road construction. But we always see that in rural areas, nothing has yet been built. For example, in the Bintulu area or in Kapit. Later I will convey the Jalan Machan - Jalan Pesisiran Kuala Tatau to Supai. The government has promised since 2002. In 2005 we promised that, yes, in the Ninth Malaysia Plan we would tender and build. Now, today I have been informed that although 10 kilometres have already been approved with an allocation of RM30 million, nothing has been done yet. Whether it will proceed or not, or whether it will be withdrawn. When I asked officers, not one of them knew. Only Allah SWT knows. Today I want to ask whether this road will be built or not? We, Barisan Nasional and the Ministry of Works, will fulfil or not fulfil the matter of this area by the sea. Now they want to travel to Bintulu and return by boat. Now it is the end-of-year season, the waves are very strong. How many times have they already had accidents at sea? It is as if we are showing the people that the Ministry of Works does not want to pay attention. Does not want to take this matter seriously. As if we are taking people's lives lightly and treating them as a joke. Why have we approved it, but until today I have been informed that he said pending SPA approval. If we really want to wait for SPA approval, that is why the federal government must want to discuss and expedite this together with the Sarawak State Government to resolve this problem. Do not let the people become victims and the people become noisy. We act as if we do not know. How long will it be like this, with our attitude like this, Mr Chairman? When can we solve the people's problems if we
just pretend not to know? Very soon we will enter the Tenth Malaysia Plan. How many times has the Eighth Malaysia Plan already shifted to the Ninth Malaysia Plan? Very soon will we move to the Tenth Malaysia Plan? The same as Jalan Ulu Pandang. Jalan Ulu Pandang, I am informed, is already a strength road; we have just approved the first stage one. For first stage one, it was approved at RM15 million. But when will it be built? Only Allah SWT also knows. When the Public Works Department (JKR) is asked, they say there is still no plan. So, I want to know when JKR will be truly serious. These two roads are for Bintulu, namely Jalan Pesisiran Kuala Tatau to Serupai and Jalan Ulu Pandang. If they cannot be built, why can they not be built? I want to know the reason why they cannot be built. So I want to take this opportunity to raise this problem. I think my Sabah, the Member of Parliament for Kapit, is also very saddened. How many times has the road from Sibu to Kapit been debated? He has debated it dozens of times. I used to live there, now I have moved here, and this problem still has not been resolved. I do not know what the problem is. Why can it not be done? If we had the vision of Tun Abdul Razak in the 1970s, he went to Kapit by helicopter. But now, if we wait for the next Prime Minister, tomorrow he will become Prime Minister, and if he wants to go to Kapit he will also want to use a helicopter before he can go. The same road as... We are not making any change. So, what is the problem, with permission? Why do we just put Kapit aside?
There is no money.
Ha?
There is no money.
Why is there money to build other roads, but no money for the Sibu to Kapit road? This is what I always ask. Do not let the Honourable Minister's constituency roads all be built nicely. Hey! Other Members of Parliament's constituencies have no money!
There is no money.
We want roads too, don't we?
The Honourable Member for Kapit. Yes, please, Honourable Member.
Thank you, Honourable Member for Bintulu. I feel moved because Kapit has been mentioned several times, and Mr Chairman, indeed this matter is as the Honourable Member for Bintulu raised earlier. We feel rather uncertain why an area like Kapit has still not been able to obtain such an important road, and Kapit has still not been able to build it. For 40 years, that is a very long time, because Kapit is a place that is very significant in the formation of our nation as Malaysia. That is history and fact. So, the people of Kapit very much hope that our government will take great care of this matter. I initially did not intend to take part in the debate at this Committee stage because at the policy stage earlier I had already debated and received a written reply from this ministry. So indeed it is stated in this reply all the items that were proposed in the Ninth Malaysia Plan, which I understand in this reply were initially approved, and finally this reply states that they were dropped again from this Ninth Malaysia Plan. But he wants to convince me by saying that we can apply again under the Ninth Malaysia Plan. Now I feel that if one day, a friend advised me by saying, 'Alex, do not threaten the government.' I am not threatening, but now I feel that perhaps we have been threatening our voters all this time. How many times have we won elections? Often. We have never lost. When during the campaign we did not get support, we said vote for the government,
vote for Barisan Nasional, and vote for us so that we can bring or provide development that is so important, like this.
Yes, Honourable Member.
We still did not get it, and we postpone it to the Tenth Malaysia Plan, perhaps the Eleventh, and perhaps I will not say it like the Honourable Member for Bintulu. Only God knows when we will get it, but please do not wait too long. Thank you, Honourable Member for Bintulu, for giving me the opportunity. Mr Chairman, I will not stand up to debate. That is enough.
Thank you, Honourable Member for Kapit. Mr Chairman, I am indeed saddened to hear the speech delivered in this august House. I take his speech into my own debate. I hope the Ministry of Works must be aware that there are places that already have roads and have already produced results. But every day they want to upgrade. If that is the case, it would be better to make that highway become a runway. We every day want to upgrade. There are areas with no roads at all, but every day they say there is no allocation, Mr Chairman, this is what happens. I do not know whether these officers from the Ministry of Works do not understand or what, because I do not understand. There are ministries where I can see there are already results, but still they upgrade, results again. Not even one year has passed, and we can see upgrading again. Once again, a result is produced.
I do not know whether these officers do not go to the field, or the Permanent Secretary, for example, wants to go to Kapit but is afraid of getting lost, or he does not want to go, he does not dare. Perhaps this area is too far outside his area, so he does not want to go. That is why he postponed the project. This is just what we think. The people also think like that, perhaps. If not, they cannot see why until today we still cannot build. How many more decades will we keep promising? We must want to see, if there is an emergency, if people have an emergency and want to go to Sibu General Hospital, how can they go? If they take a boat downstream, how many hours will it take? At least 6, 7 hours, 15 hours. Not even sure they can arrive, no. If they do arrive, they may already be dead halfway. So why are we making things so difficult? We have heard this matter so many times. The Member of Parliament for Kapit debates, debates, debates. No matter how many times he debates, it is still the same. The work moves from one Malaysia Plan to the next Malaysia Plan. I hope that this time perhaps the Honourable Deputy Minister can answer and give an accurate reply. Do not say it is going round in circles again, say that Kapit's road will move into the Tenth Malaysia Plan. I do not know whether these officers from the Public Works Department are here or not, I do not know the officers of the Public Works Department. Do not let the Honourable Deputy Minister be so busy that, when the officers are gone or forgotten, the people's representatives become the victims. I hope this matter is taken seriously. Mr Chairman, I hope the Ministry of Works this time will give a final answer. Do not let the same issue come up again in the next session. We keep debating the same issue. If it continues like this, we will not solve this problem even by Vision 2020. Can you, Honourable Deputy Minister? Thank you, Mr Chairman.
[Bangun]
Thank you, Mr Chairman. I also want to show what was raised by the Honourable Member for Telok Kemang earlier, regarding the ministry's expenditure on development, which is almost half less than the allocation over the four consecutive years before this. So what is the cause of why this ministry is given such a much smaller allocation? Because the works of the JKR are among the sources of income for most of our contractors in Malaysia, and if half of the expenditure before this were reduced, it would mean perhaps half of our contractors will lose
...or if all of them got jobs that paid half of what they earned in previous years. So we request an explanation on that matter. Next, the Honourable Member for Machang raised the new Kuala Krai-Kota Bharu road. I wish to express my support for the call that this road be expedited and given priority, because it is a trunk road, with permission, that is important as it connects the East Coast, Kelantan in particular, with the states on the West Coast. If we have a good, beautiful new Simpang Pulai-Lojing-Gua Musang road that has additional allocation, it will not help development in Kelantan if the connecting road, that is between Kuala Krai and Kota Bharu, is not given attention. So we ask for it to be expedited, and if it is not, and only a promise of a single-lane two-way road is given, that will not solve the congestion problem, with permission, at certain times throughout the year.
Mr Chairman, there is a stretch of road between Gua Musang and Kuala Krai that is a death trap, with accidents involving loss of life almost every month, namely at the four-way junction at Laloh and Lata Rek. Lata Rek is a very beautiful waterfall area that attracts domestic and foreign tourists to visit it. So this four-way junction is indeed a death junction, and I am not sure whether an application has been made before, but I was informed that none has been made. So I would like to propose that a grade-separated junction be built at this junction, because a grade-separated junction would solve the accident problem, as the road in this section is straight. Drivers do drive fast, and the rate of people crossing from Lata Rek to Laloh who use this junction is indeed high, because it connects two areas, one a village settlement and the other a place with shops. So this is indeed a death zone that needs attention.
Likewise, at several places along the Gua Musang-Kuala Krai Highway, it is hoped that the Public Works Department (JKR) or the ministry will focus on painting thick yellow lines so that we can remind drivers about several dangerous areas on this road, at Peria and also several other settlement areas. This is also requested urgently, and I am confident the cost is not large for the ministry to give attention to. One more request made in the series of speeches before this, for the consideration of the ministry, is a bridge between a place called Kandek and Kampung Biak, which, at its longest, would be a bridge of about 200 metres. If this bridge were built, it could connect Dabong with Tanah Merah over a very short distance, which would be a new connecting road if this bridge were provided. I am confident that for a 200-metre length, the cost, although I do not have an estimate here, I was informed is about RM18 million to RM20 million, which is not a heavy matter for this ministry to implement.
Finally, on behalf of the people of Kuala Krai, we thank them profusely for the series of road repairs carried out following the great floods of 2005, namely between Gua Musang and Kuala Krai, where there were two places, but one place is still in the process of repair. Meanwhile, in Dabong, nothing has been done yet. So for what has been implemented, we give thanks, but for the convenience of the public, we ask that the others be expedited. That was the last half, actually. I would like to ask...
Not finished yet, Honourable Member? Not finished yet.
It's like playing badminton.
Lastly, regarding 18400 - Federal Holiday Homes in Peninsular Malaysia, RM19 million is provided for the holiday home development programme. We want to know where these holiday homes are proposed to be located, and we ask for an explanation of who will be able to...
use them. Whether only ministry staff, or whether they will be opened to the public. I hope attention will be given to this question, and I also support the other requests, especially those from my colleagues in Sarawak and Sabah earlier. Thank you, Mr Chairman.
[Bangun]
There are still many more. Honourable Members, this is the ministry with the greatest involvement of Members of Parliament. So far, 27 Members of Parliament have debated this ministry. I am well aware that many more wish to speak, but we are short of time, and I will allow three more Honourable Members to take part in the debate on this ministry. After that, I will call the Honourable Deputy Minister to respond. I give the floor to the Honourable Member for Pasir Salak.
Thank you, Mr Chairman, and thank you to all my colleagues. I would also like to take this opportunity to debate under Item 00600 and also Item 81000. First of all, I would like to extend congratulations and commendations to the government, which has made such a large allocation to build roads throughout our country. Although some colleagues have raised shortcomings here and there, it cannot be denied that our government has, to date, succeeded in building new roads and also improving old roads for the sake of the people. If we travel here and there, whether in towns or in rural areas, we will see evidence of this success, which we cannot deny. However, I would also like to call on the government to give attention to areas that are still left behind, such as in Sabah and Sarawak, and in the Peninsula, which still have some pockets: in villages, in mukims and districts that need roads built so that they too can enjoy facilities like others in developed areas.
Mr Chairman, I would like to take this opportunity to raise one or two matters relating to my constituency, namely a road whose project launch was already officiated by the former Most Honourable Menteri Besar of Perak; with the kompang drums, the mango blossoms and so on. That is the road from the town of Ayer Kuning to the Ayer Kuning Organised Village, and continuing to Kampung Makmur Sungai Galah, Kampung Gajah. Its launch has been officiated. However, I understand that the construction of this road has stopped, and we do not know why. I feel compelled to raise this matter because it affects children who go to school. They face problems because this road is not complete; when it rains heavily, it becomes muddy and slippery. Bicycles and motorcycles cannot pass easily along that road in its current condition. So, I ask the government, because this project has already been launched, please implement it as planned.
Play the kompang again!
Insya-Allah. Another road is from the town of Chenderong Balai. From the village of Chenderong Balai through Kampung Pengkalan Daun, continuing to Kampung Makmor Sungai Galah, Kampung Gajah. There are two roads there; this one, too, according to information I obtained when I was a State Assemblyman earlier, had an allocation. It was made a project to be implemented. It is rumoured that even today this project has not been implemented. I do not know the reason, and I hope the government and the ministry can look into this matter.
Another matter is related to the construction of a new bridge. In my constituency at Kampung Gajah, which is an area in Pasir Salak, there is a bridge from Kampung Gajah on the right bank of the Perak River to the left bank of the Perak River. There is only one bridge. This bridge was built, I think, almost 30 years ago. Many accidents occur, especially during festive seasons, when a great many cars from town cross this narrow bridge. So, I request the government either to widen this bridge or to build a new bridge, like the plan for a second Penang bridge. We in Kampung Gajah might be able to do one, but not one that large, a small one. Perhaps the cost would not be that great, but it could become a very good infrastructure facility for the ordinary people in my constituency. Those are some matters connected with my constituency, Mr Chairman. I would also like to touch on the construction of these new roads and also the improvement of roads in general. In my observation, the quality of our roads is rather regrettable. I have also received information that our friends, these contractors, sometimes take very large and excessive profits, to the extent that quality has to be compromised when building these roads. It is also compromised when it is carried out by as many as two, three or even four "sub-sub soi". First sub, then sub again, and eventually "sub-sub soi". What is left, then? So, if a road is worth RM500,000, and more than half of it goes to sub-subcontractors, then only half remains to be utilised in terms of its materials and also its labour. What is more important is that the materials are compromised – it's being compromised! Building roads just to build roads, and we find that this quality is not only compromised on roads in district areas far from big cities... Please.
Thank you, Mr Chairman. Thank you, my friend the Honourable Member for Pasir Salak. When I heard the Honourable Member's argument about these "sub-sub soi" – actually it is "sub-sub sai". So, I would like...
Honourable Member, what does "sub soi, sub sai" mean?
"Sub soi" is water, "sai" is finished. [Laughter]
What language is that, Honourable Member?
I think that is market language. Not Chinese language but market language. I request an explanation regarding the matter of these sub-subcontractors. So, what actually happens, I request an explanation, this also involves the implementing officers and supervising officers who may be compromising the construction standards. So, would the Honourable Member agree that there should be strict monitoring by the ministry so that this should not happen – the standards for road construction, for example. This can be monitored and enforced by certain people from the ministry. I ask for a little explanation from the Honourable Member.
Thank you. Mr Chairman, I certainly agree. What happens at the lower level, we hope, can be monitored, namely at the level of technicians and engineers. Sometimes payments are received and certified by technicians or engineers without going to check whether the work that has been done is according to the specifications or according to the approved standards.
This happens especially, I want to say, on the PLB roads and the JPS roads in plantations, and there are many like that, including roads under the JKR ministry. I strongly agree that monitoring should be tightened by the officers concerned.
Mr Chairman, so in Kuala Lumpur it is also like that, in Damansara Heights, Bukit Damansara. I find that roads leading to various housing estates and residential areas are also like that, and sometimes I am puzzled how roads in villages are better than roads in Kuala Lumpur. In housing estates around the city it is also like that. So this means the contractors who carry out road repairs and road construction in Kuala Lumpur also need to be monitored so that their quality, that is to say, the money spent by the government is worth it. We are not against traders or contractors making a profit. I think a 30% profit is reasonable, but if it reaches 60%, that is already not right, yes. If it is 30% and then the main contractor gives the sub-work to subcontractors who do it for 10% or 12%, it's okay, fair, with permission. But do not let it reach 60%, where some people just hold a licence. They have a licence to obtain contracts, and then they give it to subcontractors. Licence holders who supposedly act as main contractors take profits of 20% or 30%, and this is what causes the quality of our roads to be compromised. I do not want to open the story of this highway. In the past, too, I heard, back in the old days, not in Pak Lah's time, not in Dato' Najib's time, not in this Finance Minister's time, in the old days. I heard amazing stories. One package, whoever wants to get a package has to bring certain allocations. So this is an extra cost to the road that is built. I am not surprised the cost might be how much for a highway? Twelve billion? But the actual cost, with permission, may not be RM12 billion, maybe less, much less than that.
Wind up, Honourable Member, wind up.
So, we do not want this to happen. Yes, in this era Barisan Nasional now under the leadership of Pak Lah and in the era of the leadership of Dato' Najib, we mean a government that uses the people's money, every sen we make sure is used in the best way. No one says there is leakage, there is no wastage and so on. If we use this with sufficient allocation, there is no reason why Sabah does not get roads, there is no reason why Sarawak does not get roads, there is no reason why other villages are still left behind, including in Pokok Sena, including wherever else Machang is, including anywhere at all. I think there is enough money to develop roads and other roads for our people. Thank you, I ask for support.
Thank you, Mr Chairman. I would like to take this opportunity, briefly, to state some matters that may have been raised before for the Hulu Langat area. I wish to refer to P.27 under head 02800 amounting to RM86.3 million, 30000 – Building New Bridges RM25 million, 31000 – Building Roads, New Bridges RM67.8 million, 6000 – Upgrading Roads RM155.9 million, 61000 – Upgrading Roads RM389 million, 70000, namely the Beautification of Roads Project RM93.3 million. Mr Chairman, I have raised matters about these roads some time ago, but the Honourable Minister replied that roads under local authorities (PBT) must apply to the state government. What I want to raise today is all federal roads. The first is Jalan Dusun Tua from Batu 9 to Batu 18, which was damaged by floods and is also used by heavy vehicles, heavy lorries. So, I hope that with the allocation available just now, it can be upgraded and repaired. Likewise, the same road is too narrow, causing congestion especially at the town of Batu 14. I hope the government can upgrade it, namely by widening the road a little. Second, the road from Kajang to Beranang, which is narrow and small, although some parts of the road have been widened, becomes congested again when it meets several small bridges, namely at Rinching and at Beranang. Therefore, based on the upgrading allocations just now, for example under 31000, we hope that part of the funds can be allocated to build several bridges or widen the bridges on this federal road.
On the same road, the third matter is that there is severe congestion between the LEKAS Highway exit towards Broga, which passes through Taman Desa Mewah, Paling Jaya, and the town of Semenyih, which needs to be widened. I understand from the JKR that an allocation has already been made, but until now the road has not been widened. On the same road, I also understand there is already a plan or design to build a footbridge across the congested road in the town of Semenyih, for children to cross to the national school, but until now it has not been built. Then, fourthly, I also understand the LEKAS Highway has already planned to build an exit to Bandar Tasik Kesuma. So, after the exit to the Bangi/Semenyih road, I would like to ask the Honourable Minister when this exit can be built, considering the severe congestion between the LEKAS exit to Broga. So, that is all, thank you.
Thank you, Mr Chairman. I too will speak briefly, only wanting to touch on head 60000, namely Upgrading Roads and Routes. Mr Chairman, in my constituency there are two signboards that have been erected by the district JKR to upgrade roads: the first to Kampung Tengah, Segamat, and the second from Kampung Tengah to Kampung Tugu Tiga. These signboards were erected, I think, almost a year ago, but in terms of implementation action, they have not moved at all, there is no progress, Mr Chairman. So, I see this matter as if these signboards are trying to deceive the eyes of the people, and the people ask me, what exactly is the purpose of these signboards that have been erected, whether this project will really be implemented, or whether they are merely for display.
So I have contacted the district JKR (Public Works Department), and they told me that the allocation originally made was withdrawn without any reason. This certainly gives a poor impression of the government's image and of JKR itself, because after the signboard was erected for such a long time, in the end no project was carried out. So here I wish to appeal to, or indeed beg, JKR that this project be continued this year or early next year, so that it does not become, as I said earlier, merely something for display. I also want to know what has actually happened to cause this situation. Thank you, Mr Chairman.
Thank you, Mr Chairman. First of all, I would like to thank the 29 Honourable Members who have raised several matters within the portfolio of the Ministry of Works (KKR), which we are debating in the Budget Committee 2009. I would like to inform the Honourable Members that the Ministry of Works' allocation for this budget under P.27 totals RM2.589 billion, covering 532 projects. Most of what the Honourable Members have raised concerns projects that their constituencies have applied for. Moreover, many of these projects fall under the jurisdiction of the state governments. These are not included in the Ministry of Works' budget. However, I will try to answer. If I can answer all the questions from all the Honourable Members. If I cannot answer fully, we will reply to the Honourable Members in writing. I am following the list of questions. Number one is the Honourable Member for Serian. For the information of the Honourable Member for Serian, Jalan Terabat, Morahi, has in fact already been applied for and allocated under what is said to be the RM1 billion announced by the Right Honourable Prime Minister during his visit to Sarawak. I will look into what has happened to this project. I do not have further details.
I see the Honourable Member for Pasir Mas has already returned. However, I want to inform him that he raised several bridges. In fact, for Jambatan Yahya Petra, the contract commenced on 16 June 2007 and the completion date was 12 December 2009. Due to problems with land acquisition and an increase in the prices of construction materials, an extension of one year was granted to the contractor. Therefore, the latest completion date is 12 November 2010. After taking the extension of time into account, the physical progress is 19% compared with the planned 6%. Just now the Honourable Member stated that the price was raised to RM60 million; this does not arise and does not exist. As for another bridge not yet named, Jambatan Sultan Ismail, we will apply whether this is determined and will be implemented before this year ends. Other matters concern Pasir Mas. However, I will answer in writing. I will not take up much time. To the Honourable Member for Kinabatangan, I would like to inform the Honourable Member that today the Honourable Minister of Works is still in Sabah, and during the Honourable Minister's visit to Sabah up to today, he has approved a feasibility study for a new alignment from Tongod, Pinangah, Keningau. This study will be carried out as quickly as possible once consultants are appointed, and the estimated cost of the study is expected to be RM5 million. Implementation of this project will begin in 2009. The Honourable Member for Bayan Baru asked why Jalan Queensbay, Bayan Baru, Pulau Pinang is undulating, and in fact we have already provided an allocation of RM5 million to address the undulating problem of this road, and it will be implemented next year. The Honourable Member for Bayan Baru also raised the upgrading project for Jalan Teluk Kumbar, Balik Pulau, Pulau Pinang. This is a project for which we have a Monitoring Committee, of which I am the chairman, known as the 'Sick Project'. In this committee, we have decided that this project will be re-tendered so that it can be implemented for the people.
Honourable Member, the Honourable Member for Labuan wishes to pass.
Excuse me, I need to pass. Thank you, Mr Chairman, and thank you, Honourable Deputy Minister. Regarding road upgrading, as was mentioned just now, I would like to interject briefly. Regarding a road upgrading in Pulau Labuan, namely a road between Jalan Pohon Batu Simpang Tamu and Pancur Hitam. The project was already awarded to one of the companies from PJ Selangor named Pertama Makmur Sdn. Bhd. on 15 December 2006 and was expected to be completed on 15 December 2008, which should have been completed next month.
The problem is that this project has not progressed much until today; all that we see is site clearing, whereas, if we calculate, the project should have been completed on 15 December 2008. As we can see from the expenditure that was allocated in 2006-2007, the actual expenditure was RM12,508,621 million. This means I think that if the actual financial expenditure has already been spent, why until today has only site clearing been carried out, and why the monitoring by JKR up to now shows the project is not moving? Second, what I understand is that the contractor applied for mutual termination, with permission. Is mutual termination permitted under the contract, and if it is not permitted, will the project be re-tendered through open tender? I think the contractor brought in from Petaling Jaya Selangor has indeed obtained many projects in Labuan, but almost most of the projects carried out, most were delayed or late. So he is not a very good and solid contractor. I think if Class A contractors in Labuan were given the opportunity, I believe they could also carry out the work better than the contractor who was given the project. For 2009, only RM26,500 remains as the estimate. So...
Mr Chairman, who is answering this question? Is this the answer, or is it an answer provided by the ministry?
No, what we see here, Honourable Deputy Minister, is an allocation that has been made. Has part of this allocation already been spent, when the project is still only at site clearing, while the people of Labuan are hoping the road will be completed properly? What is the method of monitoring this contractor? Thank you.
Yes, that is enough, Honourable Member.
Let me add a little, Honourable Deputy Minister. Jasin. The Honourable Deputy Minister mentioned just now about the sick project of which the Honourable Deputy Minister is the chairman. This may be because we made mistakes in selecting contractors, but at the same time we must not forget that the Ministry of Works in fact receives a very large operating and development allocation totalling RM3.9 billion. So this large allocation to ministries often does not achieve its target because of weaknesses in management and also in our delivery system, especially in project implementation and also in payment. I would like to know what the target achievement percentage of the ministry is for 2009. After that, what is the performance of the implementation of KKR projects in 2008 compared with the allocation we provided? So much of this allocation is not received by people there, not received by people here. So how much surplus do we have? Whose mistake is it, and what is our achievement percentage? Thank you.
Honourable Deputy Minister.
Yes, Honourable Member for Kota Melaka.
Thank you, Mr Chairman...
Mr Chairman, I...
Jawab dahulu.
I will forget to answer later.
Okay, all right, I will wait.
There are too many. So for that project I need details. Give me the details so that I can investigate. What was just said about the ministry's performance last year, in fact, if we look at the ministry's performance, it is second best in the whole nation. We are second best, achieving up to 96% of all projects implemented.
Honourable Deputy Minister, if that is so, I congratulate you, but I have received many complaints that many contractors have not yet received payment. That means if payment has not been made, our performance must be low.
Mr Chairman, in fact, if the Honourable Member can differentiate, sometimes projects are not under the Ministry of Works. That is the problem. Perhaps it is under the Ministry of Education, these schools, or the Ministry of Health, namely hospitals. Sick hospitals, not sick buildings. Sick schools, they bring to our ministry. We become patient specialists for the projects.
Honourable Deputy Minister, if I may continue a little. May I? In fact, at this time, if it is about building construction, whichever ministry does it, people will still blame JKR...
Betul.
...because JKR has expertise. So I would like to propose that, if possible, for any development, whichever ministry implements it, monitoring and inspection should be carried out by JKR. Apart from them having expert staff, JKR in fact has
authority. What happens at this time is that many projects face problems because ministries do not allow JKR engineers to carry out monitoring. Allegedly, it is 100% under the control of that ministry. What is the Honourable Deputy Minister's view?
I agree with the Honourable Member, because our Ministry of Works has 800 professional experts and staff totalling 15,000. We are capable of carrying out all infrastructure development in our country. I will continue, because there is a lot of this.
May I ask you to pass?
Oh yes. Briefly, please.
Thank you. Thank you, Mr Chairman, and also the Honourable Deputy Minister. I would like to ask briefly about what is said to be maintenance and upgrading, or work for maintenance. I understand that in the past JKR gave contracts to contractors to carry out repair or upgrading work on federal roads under JKR, and these were given as one-year contracts, and their performance or work could be controlled. Is the Honourable Deputy Minister aware that in Melaka, JKR has given to one company a 15-year contract in one go to carry out upgrading and also repair or maintenance for roads in Melaka? I see that if we give such a very long contract, what methods can we use to control this company, and we also do not give opportunities to other companies to participate or obtain contracts. If this company is unable to carry out this work, as the Honourable Member from Pasir Salak said, it will subcontract to others. How can good work be obtained if it is subcontracted to two or three contractors? That is why I ask for an explanation from the Honourable Deputy Minister.
Honourable Deputy Minister, a short addition.
Ya.
Thank you, Mr Chairman. As I stated earlier regarding the road project in Labuan. That road project has not only failed but can be said to be paralysed, which should have been completed in December 2008, but until now, not even 25% has been carried out by that contractor. So what is the government's action, that it has waited for almost two years, and until now there has been no decision given by the government, because what we see is that money has already been spent in such a way, and we also hope to know what steps the government will take so that the road project can be completed. If we calculate, it is impossible to be completed on time, but what action will be taken against that contractor so that in the future other contractors will not be like the contractors who carried out that project. Thank you.
Mr Chairman, thank you, Honourable Member. Earlier, I said that if I could be given the details, I heard just now that there was indeed a problem there. Perhaps it is a service line problem. Give me the details, and I will investigate. Can I? Here I cannot resolve it.
I will give the details.
Okay, I cannot resolve anything here. Okay, thank you. The Honourable Member for Bayan Baru also...
Excuse me, I need to pass. To help the Honourable Member for Labuan.
This case will come...
[Interjection] Not Putatan's. What was raised by...
Honourable Member, he is not giving way to you. Sit down again.
I will answer what was raised by the Honourable Member for Putatan later. The Penang Outer Ring Road project, its status is still under consideration by the Economic Planning Unit. For the Butterworth Outer Ring Road, the toll at Sungai Nyior, we have not yet been able to abolish this toll because we are bound by the concession agreement. If we abolish the toll, they may face problems in repaying their loans. The Honourable Member for Gelang Patah, regarding Klinik Kesihatan Taman Universiti Skudai. This project was already tendered on 19 November this year, and the construction date may begin in December and will be completed on 3 June 2010. The Honourable Member for Batu Gajah, the report of the study on the toll rate is a study made by several people on this committee. I cannot confirm whether it can be displayed or given to everyone, but in my opinion, the concession agreement, the government has already declassified it and it may be removed from the OSA restriction next January. Perhaps everything in this concession contract, we can look into it. This agreement between several committee members, perhaps the Honourable Member can write to the concessionaire, to request it. We are only part of the agreement.
[Bangun]
Honourable Deputy Minister. I am very shocked by that answer. If I am not mistaken, in May or June, when the minister was in the House, we were given the impression that there would be a good rate as a result of the committee's study findings. We were asked to wait, the Minister said to wait. The Ministry has already set up a committee. Now the Honourable Deputy Minister says it seems no longer important because the concession contract terms document will be declassified. I think the findings of the committee's study are very important because there we will get very important information: traffic projections, toll collection for each toll plaza, financial management by these concessionaires. If there are already such contract terms, why set up the committee at all? Now there is the establishment of a committee by the ministry, which shows there is an important role that can be played. There must be very important information, because we were agitated about the possibility of toll reductions once the committee was set up. Today we only hear about a discount. We cannot force the toll plaza concessionaire to give a discount from 12 midnight to 7 am starting 1 January. So, the accountable person has said there will be a result. Inform the House what important points were found from the committee's findings.
Thank you, Mr Chairman.
Honourable Deputy Minister. For my part, I would like to thank PLUS for reducing the toll rates. This is because I have visited many states and many foreign countries. Recently I had to go to America, and I saw that our tolls are the cheapest and the best. However, what I want to say here now is about these highway concession companies, which are not patriotic at all. At least PLUS has reduced its price. Why do these concession companies not reduce their prices in this situation where we are facing difficult times? Secondly, I want to ask the Honourable Deputy Minister. In Jasin we have a toll that was financed by a developer company; it bore all the expenses, RM40 million it spent. It built the road, it built the toll so that its land would develop. However,
what we see is that the road does not follow JKR specifications. Now the road is destroyed. JKR patches it, patches it again and again. So, our cars have been damaged, and people do not want to come near Jasin. I want to ask for the views of JKR, what necessary action should we take for the Jasin toll?
Okay, regarding this Jasin toll, I will inform the LLM to carry out a review, and we will see how the road can be repaired. Regarding the Honourable Member for Batu Gajah, what the Honourable Minister answered the other day was that we have already set up a committee to conduct a study for a decision to be taken by the Cabinet. The decision has been given. The first decision is that the concession agreement is declassified, and regarding the toll prices, we have seen that a decision has been made where PLUS has given a discount. Perhaps this cannot satisfy everyone, but it is a beginning. I hope the Honourable Member will understand. The concession company also has responsibilities, to pay its loans and also to maintain the roads. Everything needs to be done.
Honourable Deputy Minister, the Deputy Minister is like a voice representing these concessionaires.
Eh! No, no.
So sympathetic to the concessionaires, at all times when the contract has favoured the concessionaires.
Don't, don't say it like that.
Not like that?
No. Don't say it like that.
He has no such intention, Honourable Member. Please, Honourable Member for Batu.
[Speaking without using the loudspeaker]
That is not nice, don't say it like that.
Thank you, Mr Chairman. Honourable Deputy Minister, I just want to raise the issue of the classification of that agreement. It is only so that the public can know what the contents of the agreement are, but for the government, that is not the issue. What the public is now waiting for is how the agreement with this concessionaire can be changed so that the people are not burdened with high tolls. In fact, we do not need to wait for this classification to know the contents of this agreement, because these contents are already known to the people and already known to many Members of Parliament here. Only now we cannot use these contents publicly because of the OSA. What we must have in front of us is how we can get an agreement that is not biased towards the government and not biased towards the taxpayers. That is the issue, and this classification will not change the reality of this one-sided agreement. So what we want to know is, what are the next steps the government will take, considering that the terms of the agreement are very unfavourable to the people? What is the government's proposal to take action to reduce the burden on the people? Thank you.
Mr Chairman, thank you to the Honourable Member for Batu. This is a request to which I have not yet been able to respond on behalf of the government. Okay, we take note of what the Honourable Member for Batu has said. The Honourable Member for Jerlun has touched a lot on the subject of projects...
Sorry, yes. Honourable Deputy Minister, I am surprised, sorry. I want to ask about another issue that I raised, which has been fully answered...
Honourable Deputy Minister, I asked for the floor earlier but it was not given, yet with the Honourable Member for Batu Gajah standing up again and again. He should not be given another chance. He has already stood up many times.
The Honourable Member for Putatan.
Yes. Give the chance to the Honourable Deputy Minister to finish the winding-up.
Just now, Honourable Deputy Minister, I wanted to ask whether the issue I raised has been resolved? For the discount by PLUS, was any study done on whether it is safe to travel from 12 midnight to 7 a.m.? Was any study done, whether it is safe for users? Will all that be answered?
We will take this to study whether it is correct or not. If I answer now, it is also useless. It will not satisfy.
Honourable Deputy Minister, the people outside are in fact very dissatisfied with what is supposedly corporate social responsibility.
Betul.
So the answer cannot be delayed any longer. Was a study done or not? Traveling at midnight hours, is it safe?
Honourable Member, you asked just now, one minute, three minutes again. How can I say yes, there is. There isn't yet, is it not?
Please answer in writing, Honourable Member.
Yes, we will do it in writing. Let me give it to Putatan first, otherwise he will be angry with me.
He is already angry, Honourable Member. Yes, please, Honourable Member.
Thank you, Mr Chairman, thank you, my friend. That's right. Do not let the Honourable Member for Batu Gajah keep on asking, his question is different from what he debated earlier.
Honourable Member, your question, Honourable Member.
My question is the important one.
He is jealous. [Laughter]
[Laughter] Honourable Member for Shah Alam, what are you doing looking back like this? Is it not following the meeting rules? I am looking at this with the Chairman.
[Menyampuk] [Ketawa]
Honourable Deputy Minister, my earlier question, the one asked because it has gone too far in front of us. My earlier question was about projects that cannot be completed within the stipulated time. So, are you aware or not that a matter raised by my friend from Pasir Salak, namely about the subcontractors who may not be able to complete these projects because of the shortage of allocation caused by the percentage that has been taken and deducted repeatedly.
The Honourable Member for Putatan.
So my question is, does your ministry intend to review the law so that when a project contract is awarded, it cannot be subcontracted.
Honourable Member, this issue was raised by the Honourable Member for Pasir Salak and has not yet been answered.
No, no. This is not included.
Not yet answered by the Honourable Deputy Minister.
This extends to the Honourable Member for Labuan's issue.
The issue of the Honourable Member for Labuan has been answered by the Honourable Deputy Minister. It is a specific matter and he is requested to submit the details to the ministry.
The Honourable Member for Pasir Salak did not ask this question.
The Honourable Member for Pasir Salak has not yet been answered by the Honourable Deputy Minister. Following the new sequence, Honourable Member...
But he did not ask, he did not ask earlier, did he?
...Honourable Member is the seventh Honourable Member out of the 29 Honourable Members who have spoken earlier, Honourable Member. Still far, far down. Not yet, yes.
Okey.
[Bangun]
Yes, continue, Honourable Minister. No one needs to respond to the Honourable Member for Putatan. Yes, Honourable Member for Shah Alam.
Thank you, Honourable Deputy Minister, Mr Chairman. I think that with the answer given just now to the question raised by the Honourable Member for Batu Gajah, the conclusion we can draw is that no study was done on the implications of encouraging many people to drive after 12 midnight in order to get the rebate or discount. This means the decision was made without conducting a study, and I would like, if possible, the Honourable Deputy Minister to confirm whether that is so. Should a study not have been done first? Then only submit a proposal, and this shows to me, indeed there is none, although the Honourable Member for Putatan congratulated and thanked. Oh! Was it not the Honourable Member for Putatan just now? Who was it, there is another Honourable Member.
The Honourable Member for Jasin.
The Honourable Member for Jasin. In fact, the reality is that it is very regrettable. We want toll rates, if we look at places like Shah Alam, where the toll plaza has become multi-layered. When it is multi-layered, it means the traffic flow, the number of vehicles, exceeds the original design and the original projection. So it means the traffic flow and the number of cars are larger and greater, and if that is so, then why can this government not give a serious discount, one that is truly caring, truly intended to be given so that it can be enjoyed. This is his question, fine. Thank you.
Thank you, Honourable Member for Shah Alam. In fact, I am not on this committee. Perhaps I do not know whether a study was done or not. This is the actual fact.
Honourable Member, Honourable Member.
Does the Honourable Member want to give way? The Honourable Member for Pokok Sena, yes, please, Honourable Member for Pokok Sena.
Yes, I will give way to the Honourable Member for Pokok Sena.
Good. Thank you, Mr Chairman, thank you, Honourable Minister. There is a statement made by a traffic and transportation expert from the School of Housing, Building and Planning, USM.
Here it is stated that the results of the study done by USM show that the accident rate at night is high, and people are worried that many will use the roads at night after 12 o'clock, so accidents will occur and robbery cases will also occur. Yesterday, if I am not mistaken, I read that an agency under the Ministry of Works also conducted a study showing that indeed a high accident rate occurs at night. So for me, the decision to give a 10% rebate only after 12.00 midnight does not provide great benefit to users, and on the contrary, 90 other users use the roads before 12.00 midnight. [The Deputy Yang di-Pertua (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar) chaired the Committee] Only 10%, if we go by the study, of the 800,000 vehicles in use, only 10% use after 12 midnight. So I think the government did not carefully consider the results of that study and merely gave a rebate or discount of just 10%. For me, this does not benefit users, and on the contrary, I agree with my colleague the Honourable Member for Batu Gajah that it seems the government is more pro-company, pro-corporations, pro to the people.
Honourable Deputy Minister, the Honourable Deputy Minister's answer is not in the committee, therefore not knowing whether a study was done or not, the answer is totally unacceptable. Even though the Honourable Deputy Minister is sincere. This information must be readily available because the discount given was only just announced. If one does not know such important information, whether a study was done or not, and there have been many objections and dissatisfaction raised by the public and associations, Honourable Member, Honourable Member still does not take note of this, which shows the Honourable Deputy Minister, sorry, is negligent in responsibilities. That is the most basic thing. If this side asks whether a study was done or not, and the Honourable Member says he does not know, that is completely unacceptable. Finally, just one last question: is the Honourable Member satisfied with the 10% discount? That is easy. I hope you can answer.
The Honourable Member for Pokok Sena just now, thank you for the proposal just now, his opinion, and the Honourable Member for Batu Gajah, if we speak the truth, even being sincere is wrong. Indeed I am not satisfied with the 10% rebate. I myself also pay tolls. The Honourable Member for Puchong also invited...
Tuan Pengerusi...
I also pay tolls, every day, every week I return to Kuching, I pay tolls, I also pay.
So what percentage discount should it be? What can be done so that we can together reduce the burden of these toll payments? The
Honourable Member, the Deputy Minister is a Deputy Minister in the ministry, surely can do something.
Mr Chairman, thank you, Mr Chairman, thank you, Honourable Deputy Minister. Regarding this toll issue, I think we do not need to politicise this matter. Honourable Member for Batu Gajah, I have already asked in my newspaper, I have already asked the ministry to review it again. I have already raised this matter a few days ago. What else, wasting time with pro, pra, pro, pra. Do we want political mileage? Let them answer what should be answered, what the people's problems are. Regarding tolls, I think from Barisan Nasional we have already asked about this matter and requested a review again, that is all, I hope that is enough, Mr Chairman. No need to politicise this matter, does he want to get tomorrow morning's newspaper, show to the people, I have already asked about this matter. We have already asked, no need to do pro, pra, pro, pra, what for? There is no result. Did you read the newspaper a few days ago, I have already asked. On this matter, I say as Barisan Nasional, I do not agree if from 12.00 midnight until tomorrow morning until 7.00, we do not agree, that is all.
You shut up, you talk but there is no result at all. [Laughter]
Mr Chairman, may I ask a question?
May I come in?
Honourable Member, just look...
Hurry up, Honourable Member for Puchong.
The Minister said two, Honourable Members said 10.
There is one question...
Mr Chairman, I will continue. Later the Honourable Member for Puchong will have his turn, and I will answer.
Give the Deputy Minister a chance to answer first. If there is nothing new, do not answer; the Deputy Minister need not answer new matters if they were not raised in the debate earlier.
The Honourable Member for Jerlun said something about the congestion at toll plazas, it is true that we will add lanes for Touch 'n Go and Smart Tag electronic payment. The development of the Pulau Layang-Layang aircraft runway on Pulau Layang-Layang. This is under the Ministry of Federal Territories, and now we will extend this runway from 1,067 metres to 1,637 metres. It was done in 2003 with a total cost of RM34,86 million. The Honourable Member for Parit Buntar...
Mohon...
Just read it, the others answer in writing.
Terima kasih...
Request for clarification. Thank you, Mr Chairman, thank you, Honourable Deputy Minister. Just now I asked about the aircraft runway on Pulau Layang-Layang. That is not about extending it, but upgrading it so that the F50 aircraft can use it. That means it requires wind sockets, lights, and also fire engine supplies to be upgraded. The second of my questions is about the Jitra-Kodiang road, how is it? Thank you.
Thank you, Mr Chairman, thank you, Honourable Member. I will answer in writing. I want to finish tonight. The Honourable Member for Kuala Krau, namely the rest area at the toll plaza, by the MPD for cleaning the R&R in the MTD area, it will be given to local contractors, priority will be given. Maintenance of roads in the Kuala Krau area, we, the concession companies, also carry out patrols, and if there is damage and potholes, they will take action.
The Honourable Member from Sepanggar, on the other hand, raised the matter of resurfacing 5,500 kilometres of roads in Sabah. The Minister recently announced it in Sabah, I do not yet have the details, and we will give it in writing. The main damage to the main building, the tiles, walls, wall tiles of government buildings, I will look into it, this is a building project. The Honourable Member from Arau proposed a road that will connect Padang Besar to Bukit Kayu Hitam. The Economic Planning Unit, Prime Minister's Department, let me finish this first.
No need to disturb the Honourable Member, we follow those debating, he answers according to that only.
Has it passed already? I will finish this and then I will go.
Mr Chairman, earlier I had debated about Kuala Krau..
This is Arau, is it not? Arau, Honourable Member.
Up to the end of this year, we have already spent RM25 million involving 150 contractors in the Arau area. I am giving it to him because I have just finished...
Thank you, Mr Chairman, thank you, Honourable Deputy Minister, I apologise, I was a little late entering while the Deputy Minister was answering about Kuala Krau. About the widening of the junction road to Kampung Awah and also to Jengka Lapan and also up to the Gunung Senyum Tourist Centre. This road is very dangerous, its slopes have many collapses. I ask for the view of the Honourable Deputy Minister on this road that needs upgrading. The second thing, I also mentioned the construction of roads, the widening of roads has been carried out, but the construction or widening of bridges has not been done, causing the safety of users, some of whom have veered into rivers and so on. This is what I ask for an answer from the Honourable Deputy Minister. Thank you, Mr Chairman.
Mr Chairman, thank you, Honourable Member. In fact, I had already said earlier that I will answer in writing that the roads have been widened, the bridges have not yet been widened or enlarged. This one we will take note of. The Honourable Member for Arau also spoke about Class F contractors, taking contracts from main contractors. We have already implemented a new method where for projects totalling RM10 million and above, they must give 10% to Class F contractors. Distributed, allocated to all Class F contractors who have been recognised by CIDB, not just any, and these contractors are local contractors where the project is held. Every Class F contractor is given projects totalling RM200 thousand and below, and payment will go directly to the subcontractors, no longer through the contractor. We know that much has happened where subcontractors did not receive payment. The Honourable Member for Pokok Sena has also touched on the matter of IBS. This is one component, one
development of the construction industry where the government has set that all contract work, building work in government contracts, will use 70% IBS. In fact, if we use IBS with this system, the industrialised building system, properly, it reduces time, productivity, and I do not know where the Honourable Member got a detail that it may be more expensive, but in our study, we know it will be cheaper.
Thank you, Mr Chairman, and thank you, the Honourable Deputy Minister. I will take one example of an IBS project implemented under the Ministry of Education. The Ministry of Education had earlier implemented IBS projects for the construction of additional blocks as well as new schools. For example, one project for the zone in the state of Selangor and the Federal Territory was awarded 45 additional buildings and five new school buildings to a single company in Ibuzawa, at a cost, I want to mention, of RM850 million. If I look at one school, namely Sekolah Menengah Kebangsaan Datuk Ibrahim Yaakob, Batu 5, Jalan Ipoh, its cost was RM5 million. If this is a new school, then for five schools that is RM25 million, which means the rest was only for additional buildings. So the total cost under IBS under this Ministry of Education, where the Ministry of Works is the monitor of the implementation of this project, means spending RM850 million and giving it only to one contractor company, Ibuzawa. We do not know whose company it is, whose firm it is, or who has interests in Ibuzawa. So there are two issues. In this context, I say that the first is that it was given to one company. Can the Public Works Department (JKR) agree that the Ministry of Education's decision is the best one, when it could have been distributed to many more contractors in our country? The second is the question of price. I say this because I am basing myself on evidence that RM850 million is, to me, a very high cost. I ask for an explanation.
Thank you, the Honourable Member. In fact, during the IBS roadshow the government has already decided that it will use 70%. Perhaps earlier, because the Honourable Member knows this, it was only 50%, and he has not yet used it up to 70%. At present we have 119 manufacturers producing IBS components. There is no monopoly here: 119, and 895 contractors who are active in implementing IBS. Many contractors also carry out work using IBS, and we will develop more Bumiputera manufacturers to support the implementation of this policy. However, I may not be able to answer the figures just now; I have only just heard them.
Thank you, Mr Chairman. Recently, on 12 November, there was a programme with the Minister, the Minister of Works. I was informed that there were 160 complaints received by SMS, all of them related to IBS, dissatisfaction and problems associated with IBS. So what action has the ministry taken in response to the 162 complaints received by SMS in the recent Bersama Menteri programme, relating to IBS?
All these SMS messages, if they were sent to that TV show, Bersama Menteri, the CIDB (Construction Industry Development Board) examines all these complaints. I hope they will take action. The Honourable Member for Ledang asked whether the CIDB is being privatised or not. The CIDB is a board under the Ministry of Works, and it is wholly controlled by the government and is a statutory body, and it also serves as a financing service, where all its budget is borne entirely from the CIDB's income. The Honourable Member for Ledang also asked whether the LLM will be privatised or not. For the information of the Honourable Members, the Malaysian Highway Authority (LLM) is a statutory body established under the Lembaga Lebuhraya Malaysia (Perbadanan) Act
1980. No operating expenditure allocation has been provided to the LLM, since the LLM is a self-financing agency. As for other matters raised by the Honourable Member for Ledang, we will reply in writing. The Honourable Member for Machang raised the status of the Kuala Krai - Kota Bharu road in Kelantan. For the information of the Honourable Member, this project will proceed by direct negotiation, with 58% - 20% for Bumiputera contractors from Kelantan and 22% for open Bumiputera. The alignment to be built will follow the new alignment, except in the area near Kota Bharu where a multi-storey structure will be built. Multi-level junctions will be built at the intersections with existing roads. This project will be fully financed by the government. The scope is still under discussion with central agencies, namely the Economic Planning Unit (UPE), the Prime Minister's Department (JPM) and the Ministry of Finance, as to whether it will be two or four lanes, and this has not yet been determined. Furthermore, regarding the deadly stretch of the Kuala Krai-Gua Musang road and the installation of signboards, in fact we have added signboards. When did the Honourable Member go? Did they not add signboards?
Coincidentally, I have not passed through there yet, the Honourable Member. I drove from Machang to Kuala Lumpur.
They have added them recently. If they have not added them, tell us.
Wait, Machang, they have added them.
Next week is also fine. I also go back to my constituency every week.
Look and see whether they have added them or not.
Deputy Speaker too. All of us go back to Sarawak every week. We will set about preparing a design for destination signboards and clearer directions.
Honourable Minister, may I? Just briefly, regarding the Kuala Krai to Kota Bharu road. Thank you, Honourable Minister, for answering almost everything I raised. The matter is quite clear. Only, when is the preliminary work expected to be carried out while the decision at the level of the Economic Planning Unit (EPU) and the ministry is being made? When, I wonder? So it is easier when I face the people in my constituency. I can explain this matter clearly. Please provide a little explanation. Thank you.
Honourable Member for Machang, there is no record of when. I cannot answer. We will give it in writing. The officer will provide it. The Honourable Member for Putatan has already come out, and cannot wait any longer.
Putatan is still there.
Masih ada?
[Bangun]
Oh yes, yes. Traffic at the Petagas Bridge. This matter in Putatan is similar to my constituency in Stampin, where we have an airport, Kuching Airport in Stampin, KK Airport in Putatan, and there are also flyovers. Likewise, there is the Kenyalang Flyover in Kuching, BDC, and I understand what this area needs because of traffic congestion. For the Honourable Member, we will build it under the Jalan Kepayang upgrading project, Phase 1B, which only started in October. Has it started? The pile-driving work has already begun. This bridge is an addition to the two existing bridges and is expected to be completed by the end of 2009.
Mr Chairman, Honourable Minister, I am amazed, and proud, at the ministry's answer that what was answered just now is what I had already said is being implemented. That is not the real answer. So I hope the government officers who take notes when we debate in this august House will provide answers that inspire confidence in this House. Do not answer merely so that the minister can answer. Give a clear and specific answer. What I asked during my debate just now was about the continuation from the Petagas Bridge to Lokawi Camp, not from Kepayan to Petagas. I think officers should be close to the minister so that the minister can answer correctly, with an answer that inspires confidence. The answer just now did not address what was raised. I already said thank you because this is being implemented. What I raised, Mr Chairman, is the continuation where the bottleneck is on the bridge from the Petagas Bridge to Lokawi Camp, not from Kepayan to Petagas. That is being implemented. Thank you for implementing the project from Kepayan.
Honourable Member for Putatan, in fact the officer said this is the third bridge, so does it go right to the coast?
Never mind, the Honourable Member for Putatan also raised the matter of the Putatan District Office listed for upgrading. We will consider it next year for the Tenth Malaysia Plan. The Putatan District Office may be brought into the Tenth Malaysia Plan.
Mr Chairman, very well, Honourable Deputy Minister, I will write to the Honourable Deputy Minister so as to get a written answer.
Yes, thank you.
Do not bother to answer again, Honourable Member for Putatan, we will send a letter.
Okay, the Honourable Member for Puchong, who has been waiting a long time because his turn was indeed number 16. Earlier, when I was answering the Honourable Member for Batu Gajah, the concession agreement is no longer protected under the OSA (Official Secrets Act); it was declassified from January 2009. The new concession agreement, namely there are new clauses that can overcome problems such as profit sharing and the toll review mechanism. This is new; the old one had none of these, and others, to safeguard the interests of the government and the people.
Thank you, Honourable Deputy Minister, thank you, Mr Chairman. Honourable Deputy Minister, my question is simple. From the Honourable Deputy Minister's own admission, just now or two weeks ago, for the existing concessions the government has no power to reduce toll prices, and the government also has no power to interfere in matters concerning traffic. Now the Honourable Deputy Minister says that for the new concessions that will come, there are specific provisions and clauses included to overcome this problem. The question I want to ask is this: does the government now acknowledge that all the agreements signed before this have become agreements that are lopsided in favour of the concessionaires, as a result of which the government cannot do anything at all to help or overcome the problems of those who not only have to pay tolls now but will have to pay tolls for the next 20 years. That is my first question. My second question is this. We are Parliament, Honourable Deputy Minister, we are Parliament. If there is an agreement that, clearly by the ministry's own admission, is lopsided and burdens residents or the people,
as Parliament, should we not draft a law or regulation that can help the people of Malaysia? This is Parliament. I do not accept, we cannot accept, that one ministry would come to Parliament and tell us, "Sorry, we cannot do anything for the next 20 years", that is not acceptable. If we in Parliament cannot change it, who can change it? Who will bear the burden for the next 20 years? Honourable Deputy Minister, this is a sincere question. I want to know, everyone in Puchong wants to know, everyone across Malaysia wants to know, why the government could enter into an agreement that harms the people, but now comes to Parliament and says we cannot do anything, yet "don't worry, the new contracts will have those safety conditions". Please give an answer. Thank you.
Honourable Deputy Minister, let me just continue. For example, this concession company PLUS, PLUS was taken over by the government. So what problem is there for the government to change the specific clauses that clearly appear to be disadvantageous to the government and to the people? So what is the problem? That company belongs to the government, the government took it over.
Thank you, Honourable Member for Puchong and Honourable Member for Pokok Sena. What has already been signed cannot be changed now, except through drastic action.
May I ask what that drastic action is? That is important.
Discuss it with the Minister, Honourable Member.
I will discuss it with the Minister, I cannot answer.
But Mr Chairman, this concerns the people of Malaysia, public interest. Recently we read in the newspapers, it said 10% from 12.00 midnight to 7.00 o'clock, we bring good news and so on, and when we come here we want to ask about it, the whole country wants to know. It is not just a discussion between me and the Honourable Deputy Minister. I know the Honourable Deputy Minister is a good sport, I can discuss with him at any time, but this is not a private matter between the two of us. This is a matter that must be debated in this august House. This is the purpose of this House, this is the purpose of Parliament, we must come here to ask questions and the Minister must answer. We cannot come to Parliament and say, "I don't know, I am not on the committee, I did not bring any file at all, sorry, my officer also doesn't know any of the questions." That is all we are hearing, dengan izin (with permission). If that is so, I think the Minister should resign and give the opportunity to people who are capable to bring these issues in Parliament and answer our questions. That is becoming the situation, every question is "I don't know". So here the Honourable Deputy Minister himself said drastic action, I want to know what drastic action the Honourable Deputy Minister himself just mentioned? Thank you.
What actually is it, if we want to change an entire agreement, there must be drastic action, otherwise how can it be changed?
This is an answer, Mr Chairman, that all of us cannot understand. You said there is drastic action, tell us? What is this drastic action? Is there action, is it drastic, how do we know? Surely you cannot say "drastic action" and then not give an answer, you really don't know. You simply bash my question with "I don't know". Honourable Deputy Minister, please tell us, I think we want to know especially in the Puchong area, what is the situation there?
We will talk outside? [Ketawa]
Does he want to talk outside? Okay, I will tell the people of Puchong, we will talk outside, no problem. I do not understand, Mr Chairman, what is happening to Malaysia? What is happening to our government? A clear question cannot be answered? What is this? What are we doing here? There is no power, everything has no power, then there is a committee, but if you are not in the committee you cannot answer. I want to know how many people from the ministry are there? Where are the answers?
Answer in writing, answer in writing.
Write what? Write, write, write everything. Why should we come to Parliament then? It would be better not to come to Parliament, just write.
Betul juga.
Mr Chairman, I will continue...
Some people agree.
Sorry, Mr Chairman, sorry, Honourable Deputy Minister.
From now on I will not give way anymore.
Perhaps we can postpone up to here, so that the Honourable Minister can arrive, and we can start with other ministries.
Not possible, Honourable Member, because we have already partly debated this. If there is a problem, I think it must be resolved between the Honourable Members and the Honourable Deputy Minister.
But to resolve it, there must be information to enable us to say approve it, Mr Chairman.
I understand what the Honourable Member...
I think the Honourable Minister, what matter could be more important than the business of Parliament? The Minister should be present. This is the allocation for this ministry. The Minister of Works must be present.
I also think we should have a little sympathy for the Deputy Minister. But the Minister should be present, Mr Chairman, so that this allocation can be approved.
Mr Chairman, I will proceed with my answer for the Honourable Member for Seputeh. It is...
If possible, Mr Chairman, only one issue, if possible, Deputy Minister, a clear issue. Regarding B.27, Honourable Deputy Minister, I raised an issue there. It is stated there, dengan izin, and it is written here that toll compensation payments, the Honourable Member mentioned RM180 million under item 060500. I just want to know, what is that payment for? Thank you, Mr Chairman, thank you, Honourable Member.
Honourable Member for Puchong, in fact this is compensation for not raising tolls for the other concessions. Every five years in our concessions, the concession companies are allowed to raise tolls. Otherwise the government will pay compensation. This amount is for several concession companies.
Honourable Member, can I get a breakdown? If not, perhaps we would like a written answer?
A written answer is possible.
Thank you, thank you, Honourable Member.
Excuse me, Deputy Minister, may I pass? Thank you, Mr Chairman, and also the Honourable Deputy Minister. I would like to ask the Honourable Minister for an explanation, arising from the onslaught from our friends on that side regarding what action the government can take. Could the Honourable Minister make an effort so that after this we can discuss, the ministry can discuss other steps that can be taken to help the people in this matter of the toll that has been mentioned. One step that has been taken, namely as announced, is the granting of a rebate or discount for late-night hours, and that is not a proposal that is perfect or flawless. The Barisan Nasional side itself has stated earlier, from the Chief of BNBBC, that we feel this is a proposal that is not very practical in terms of achieving the goal of helping the people. It would be better to give a discount or rebate for cars or traffic that pass during the day so that the people can benefit. That is the step that I think the ministry should consider, the request from this side. [Interjection] Apart from that, please take into account, I feel, the concessionaire companies. Perhaps when they were first given the concession, they also did not anticipate that traffic would be so heavy. Today I think there are about six million cars on the road. Every year it increases by about 600,000. So the collections made by the concessionaire companies may have multiplied many times over what was projected when they obtained this project. Therefore, even though we cannot drastically change this agreement, I believe there are other ways in which these companies can help the people by easing their burden, there certainly are. Why must they make profits of billions of ringgit every year? There is no need. There is no need to make billions of ringgit in profit. Help the people. Be content with a profit of a few million, RM100 million, RM200 million or RM300 million, that is enough, there is no need for billions. So I hope the Honourable Deputy Minister will kindly, if you cannot give an answer here as requested by the Honourable Member for Puchong and also the Honourable Member for Batu Gajah, I hope that after this the ministry can discuss and bring it back to us so that we can hear what proposals there are. Thank you.
Let me add a little to what the Honourable Deputy Minister has said on the same matter. This compensation cost of RM180 million is for maintaining 1,800 kilometres of highway. I would like to ask whether the maintenance cost may be high, and whether the government is carrying out monitoring. We want to know, because this will burden the people. Perhaps they have included the salaries of their high-ranking officers. This is what we want to know, why this is the people's money. Thank you, Honourable Deputy Minister.
Mr Chairman, I have taken note of the proposals from the Honourable Member for Pasir Salak and the Honourable Member for Jasin. Thank you, those proposals we have taken note of and we will give a written reply. This is a new matter. Finally, since time has already run out, I will answer the Honourable Member for Serdang. For the information of Honourable Members, the use of the entrance at Bukit Mewah, Kajang will result in a leakage of traffic from the SILK Highway. If it is opened, the government will have to pay compensation for the leakage that is experienced. The second point raised by the Honourable Member for Serdang concerns this tunnel, underpass, with permission. The government has submitted an appeal to the EPU to consider the construction of the tunnel or underpass, with permission. However, up to today the ministry has still not received any feedback regarding this matter. Mr Chairman, since time does not permit...
Requesting an explanation. Many thanks. Thank you, Deputy Minister. I know you have not yet received feedback from that unit, but how much longer do we have to wait? It has been four years since the former minister who promised the
residents of Kajang Utama that a tunnel would be built. Must we wait until the 13th General Election or when? When can the ministry fulfil that promise?
Mr Chairman, the issue raised by Kanowit has still not been answered.
Honourable Member for Serdang, we will do the follow-up. Actually, we also do not know. If the government says next year, one year, if it still is not achieved, it will be terrible. We will try as quickly as possible with the follow-up work. Honourable Member for Kanowit, I will give a written answer regarding the rural roads in Sarawak. I have the details but they are not in my hands. I will answer in writing. Mr Chairman, I...
Mr Chairman, earlier there was a question I asked, it's alright if you cannot give it now, please give it in writing. It concerns the maintenance of Federal buildings throughout Malaysia. How many buildings and how many companies.
It really needs details and notice, because we have already privatised the maintenance of buildings and roads throughout the country, and we need to give time for me to make the details. That is all, Mr Chairman.
Honourable Members, the question is that the sum of RM1,388,326,700 for Head B.27 under the Ministry of Works be made part of the Schedule, be agreed to. The question was put, and it was agreed to. The sum of RM1,388,326,700 for Head B.27 is ordered to form part of the Schedule.
The question is that the expenditure of RM2,589,953,200 for Head P.27 mentioned in the Development Estimates for the year 2009 be approved. The question was put, and it was agreed to. The sum of RM2,589,953,200 for Head P.27 is approved as part of the Development Estimates 2009.
If you don't agree, Honourable Member, the road will not be built. Build a little, that's enough, don't refuse to build everything. Something small is better than nothing at all, Honourable Member. Honourable Member, you agree with what I said, right? Agreed.
Motion — Sitting Hours and Business Exempted from Standing Orders — Head B.28 [Schedule] – Head P.28 [Development Estimates 2009] –Motion
Supply Head B.28 and Development Head P.28 under the Ministry of Transport are open for debate.
Thank you, Mr Chairman, for giving me the opportunity to also debate in the Committee stage speech. For Supply Head B.28 of the Ministry of Transport, namely Item 020000 – Sea Transport Peninsular Malaysia, Item 020300 – Marine and Port Affairs, Item 020400 – Navigation Safety.
Some months ago, two tanker ships belonging to the Malaysian company MISC were seized by pirates in the waters of the Gulf of Aden, Somalia, while sailing through that area. We see that piracy activity, which is increasingly rampant in the Gulf of Aden, has caused ship owners to be forced to shift their routes to the Cape of Good Hope in South Africa, even though it involves greater costs and expenses and a longer route. According to the International Maritime Bureau, 94 ships were attacked and 38 of them were seized by pirates since January. According to experts, if this situation continues it will increase insurance premium payments, and insurance companies may refuse to cover ships that pass through the area, or raise their insurance premiums. This is keenly felt by ships carrying valuable cargo such as oil and so on. So if we look at the Cape Hope route, for a ship it takes 5 to 15 days, depending on the destination and the speed of the ship. The cost is around USD6,000, which is about RM21,000. This is common for ships, and usually depends on the size. Not long ago, the Joint War Committee of Underwriters, or JWCU, based in London, classified the Straits of Malacca as a war risk zone and a terrorist zone, which not long ago was clearly displayed in international media. This creates the assumption that the zone in the Straits of Malacca is an unsafe zone. Confusion arises when the international community considers piracy and robbery at sea cases as terrorist activity that disrupts international trade. Whereas these incidents are very isolated cases and do not affect the security of any country. By classifying the Straits of Malacca as a danger zone, insurance companies also either refuse to cover ships that pass through the Straits of Malacca or increase their insurance premiums. My question is, how does the ministry ensure that our shipping companies are protected from becoming victims of these insurance companies. Given that the insurance cost will indirectly be borne by consumers. The second question is, what security features have been implemented by the ministry for shipping companies to follow so that they do not become easy targets, especially among the pirates operating in the areas I mentioned earlier. So how successful is the Enforcement of the International Ship and Port Facility Security Code, namely ISPS, as recommended by the International Maritime Organization to the local shipping community, local security control and port enforcement, in our efforts to guarantee the security of our ships and ports. So far, do all our ports have port facility security officers, or PFSOs, who are trained and able to handle all the matters I have mentioned. Thank you.
Mr Chairman, I would like to refer to Item 010600 – Land Transport. Mr Chairman, about two weeks ago I was told by the Minister of Transport that the government has cancelled the privatisation of e-kesihatan, which was a get-rich-quick scheme scandal that happened in this very ministry. The e-Kesihatan was supposed to be implemented on 1 October last year after Supreme Systems Sdn. Bhd. signed an agreement with the government on 3 September. However, the aftermath of what should not have been done by the government in implementing this scheme is that it was cancelled by the government. We were told recently that Supreme Systems has filed a court action against the government claiming a sum of 'RM1.3 million' as compensation for cancelling this scheme, the compensation suffered by Supreme Systems.
I would like to ask the Honourable Minister who is not in this House whether...
There is, there is, there is.
I don't see him, he isn't here. This is a lesson that the government must learn, a matter that must be learned, not a major mistake but a wrongful act by the government. This scheme should never have arisen at all, but because of decisions favouring cronies made by the Road Transport Department (JPJ), a scandal occurred. The government is facing a claim of such enormous size. If the government loses in court, the losses and burden will be borne by the people themselves. The people will become the victims if this case is won by Supreme Systems. I would like to ask the Honourable Minister whether, why this matter could happen, and I understand that senior officers who colluded with Supreme Systems are still serving in the ministry.
Some of them have even been promoted. What is the reason this happened, and was a full investigation carried out all this time to determine why this happened and why there has been no punitive action against any party or senior government officers involved in approving this scheme. Because as far as I know, the former Minister of Transport made a statement that he was not aware of the approval of this e-Kesihatan by JPJ. I would also like to ask whether it is true that the MMA, or Malaysian Medical Association, namely Persatuan Perubatan Malaysia, was ever invited to give inputs and also proposals to make this health scheme a success. Is it true that an application was submitted by Koperasi Doktor Malaysia, which had once drafted a plan similar to what was introduced by Supreme Systems as the e-Kesihatan blueprint. I want to raise this here: is it true that the e-Kesihatan scheme that was supposed to be implemented by Supreme Systems is a blueprint that was actually designed by Koperasi Doktor Malaysia. This is because some parties have expressed their dissatisfaction, since indeed Koperasi Doktor Malaysia had once proposed that they be the ones permitted to implement this scheme, as they are a body that is highly professional and expert in that field. Thank you.
Yes, Honourable Member from... The one in front, the front one. That one in front.
Thank you, Mr Chairman, and the Honourable Minister. I do not see the Honourable Minister now. Ah, sorry. The Honourable Minister is over there. My discussion here raises issues related to Item 020300. Mr Chairman and Honourable Minister, the two busiest ports in Malaysia, the very busiest, are located in my area, namely in Klang. They are Westport and Northport, whose location is at the end of Klang. Klang town and Port Klang may have already undergone development. However, the development strategy that we witness today is not organised. It is not an organised city. So, the question in front of us, with permission, Mr Chairman, is how to make Klang and Port Klang a world renowned sea port city. A world renowned sea port city. To produce a good long-term plan, the Ministry of Transport must cooperate with the port authority and together with terminal operators, shipping and logistics companies. Moreover, the ministry needs to cooperate with the Klang Municipal Council, the local community and also with the NGOs in Klang to produce a comprehensive plan to develop Port Klang as a World Renowned Sea Port. I
propose that the Ministry of Transport set up a working committee involving all these parties to form Klang and Port Klang into a world port city on a par with Seattle, Rotterdam, Yokohama and Copenhagen. For the information of the Honourable Minister, West Word now has a status equal to or even higher in performance than Rotterdam. However, when we go to Port Klang, we see empty land over there without development. So I believe the time has come for us to develop Port Klang as A World Renowned Sea Port City. That is all, thank you.
Thank you, Mr Chairman, for giving me the opportunity to debate on this matter of the Ministry of Transport. Firstly, I would like to touch on road safety, namely Item 08000. Mr Chairman, day after day we see road accidents occurring, which causes concern to our Ministry, so much so that it has introduced several measures to prevent and overcome this problem. What I want to draw Mr Chairman's attention to are some of the measures introduced to reduce road accidents. Firstly, I find that the sincerity of the government and the ministry in implementing these matters is questionable. Sometimes I feel it is done on a try and error basis, with permission, by way of experiment. Previously, when lorries were involved in many accidents, lorries were introduced to be fitted with a bell, which rings when the vehicle moves fast. Then that also did not work. I do not know what has become of that matter now. Secondly, regarding the installation of cameras along the roads. I find that these cameras are no longer functioning now. Then buses had accidents. An attempt was made to introduce black boxes, supposedly to record the journey of the vehicle, and now I do not know what has happened with that matter. I find that the introduction of these measures seems to be a proposal put forward by interested parties, especially suppliers of those goods. But accidents still happen. The ones who benefit are the suppliers, and it becomes a laughing stock among road users. Finally, there was the introduction of rear seat belts in vehicles. Although safety was trumpeted through the use of seat belts, I do not know how true the use of these rear seat belts really is. What is important is that the suppliers have already profited from what was implemented, and strangely, the introduction was also not uniform. Indeed, according to the Minister's speech, vehicles registered before 1 January 1995 may not be enforced. This shows that it seems to be a try and error experiment to supposedly ensure safety. So I want to know how far the measures taken will continue or whether they will be stopped arbitrarily. Secondly, I would like to draw attention to land transport, namely Driver Testing and Licensing, which is Item 060400. I find that the way we issue driving licences has been given a monopoly to several companies in certain places, where I find that previously driving schools had to depend on the big driving schools and they merely tag along. We had hoped that with these big driving schools there would be better service, but I find that the cost of obtaining a driving licence is too high, up to RM1,200 to get a Class D vehicle licence, and this burdens those who take the test. So, I hope this matter receives attention so that this monopoly policy can be abolished and
more opportunities are given to entrepreneurs to operate driving schools. Thank you.
Thank you, Mr Chairman. I will once again touch on only one or two matters, referring to Head 090400, namely Land Transport with RM53.9 million, 00900 - Enhancing the Capacity of KTM RM1.85 billion and 01600 - Purchase of Rolling Stock within RM310 million. Mr Chairman, I would like to refer to public transport facilities, with permission, such as buses and trains, but which are not integrated. So I would like to invite, if the Honourable Prime Minister has gone down to the ground and used public transport, that the staff or officers of the Ministry of Transport also go down to the ground to see the problems faced by the people because our public transport system is not integrated. I will give an example in my area, for instance at the Kajang station and also the UKM Bangi station. The Kajang station is located more than 1.5 kilometres from Bandar Kajang, and there is no public transport to enter the Kajang town. So passengers have to walk a long way. Imagine if the weather is rainy or too hot, so how are those who have to walk a long way going to fare. That is also why from the UKM Bangi station to the Kajang stop it is the same, whereas the bus stop, for example in Kajang, is in the proper town centre, and likewise the UKM area is about two kilometres from the Commuter station. So I request that the ministry review and establish, with permission, a commuting system, namely public transport that connects one mode of transport, for instance between bus and train. If we refer to other countries, we see transport systems abroad, for instance in the UK, where from the bus we may go down underground to get the underground train and so on. But our places are far apart. Mr Chairman, secondly, I would like to get an explanation regarding 01600, the Purchase of Rolling Stock worth RM310 million. Perhaps I am not very clear on that, so I would like to ask the ministry. Then finally, 100100 Assistance Services worth RM103.4 million. So I request an explanation of what form these transport assistances take. Does it include, for example, patrol cars and so on. I request an explanation. Thank you, Mr Chairman.
[Bangun]
Thank you, Mr Chairman. I also wish to debate Supply Head 28, beginning with Item 100500 - Road Safety. We are aware that the number of heavy vehicles such as lorries and so on using the north and south highways is increasing every day. Certainly within the next five to ten years the number of these vehicles will also increase considerably and will to some extent affect traffic safety on these highways. I would like to know whether the ministry, in the Ministry of Transport's five-year strategic plan, has a plan on how to address the problem of road safety, considering the number of these heavy vehicles is increasing every year. We are also aware that every year, especially during the festive season of Hari Raya and so on, very many accidents that take lives occur, and this is very, very heart-rending. I see on television very many advertisements for motorcycles and cars, and there are also advertisements for oil and lubricants that actually use the elements of speed or fastness to advertise their products. This certainly has a bad effect on consumers and buyers, where they are attracted to these products because of speed. Yet we know that it is precisely this speed that kills. So I would like to know whether the
ministry intends to discuss with the Ministry of Information so that there are clearer guidelines on these advertisements, so that these advertisements do not affect safety on the roads. Besides that, I would like to touch on Item 00800 Project to Rehabilitate and Strengthen the Railway Tracks, where I see up there it mentions the project REL/LRT/ERL. As far as I know, Mr Chairman, ERL is a private company. So I would like to know why the ministry, that is the government, has an allocation of as much as RM619 million to rehabilitate and strengthen railway tracks operated by a private party. I need an explanation on this matter. Item 01300, on the other hand, is the Project to Integrate the LRT, STAR and PUTRA Stations, where the estimated project cost is RM1 million. I find that this is an important matter, where the use of the LRT will certainly increase if integration between these systems is improved. I think perhaps the sum of RM1 million is not sufficient for this purpose. I want an explanation from the ministry on this matter. The next item, 03600 - Dredging Works of small river mouths at ports in Peninsular Malaysia. I find that the problem of sedimentation at small river mouths, such as in my own area Kuala Jerlun, Kuala Sanglang, Kuala Kerpan, is a problem for users, especially the fishermen there, where when the water there becomes shallower they need that area or the waters around those river mouths to be dredged. So I hope the ministry will give attention to this problem. Besides that, Item 13000 - Construction and Upgrading of Airport Infrastructure. I raised the same matter earlier with the Ministry of Works and I was informed by the Honourable Deputy Minister earlier that this is a matter for the Federal Territory of Labuan, but I want to touch on it once more, whether the ministry intends to upgrade the airstrip at Pulau Layang-Layang so that larger aircraft, namely the F50, can use it with equipment such as fire engines, wind socks, lights and so on.
This will certainly help the island to increase the number of tourists who visit Pulau Layang-Layang for the purpose of diving. Finally, Item 40000 - Upgrading and Development of the Air Traffic Control/Management/Communication/Radar System. This is also related to the question I raised earlier regarding Pulau Layang-Layang. That is all. Thank you, Mr Chairman.
Mr Chairman, I also wish to take part in the debate at the Committee stage, namely for Supply Head 28. I would like to refer to Item 00206 and I ask the Honourable Deputy Minister, if the matter I raise goes slightly beyond this item, please give me the opportunity, because I have checked and found that the problem I want to raise is not quite precise. This, if permitted. In Melaka, the old railway line from Tampin to Melaka has been discontinued for decades, and I was also informed by the ministry that there is no plan to provide its service (service) from Tampin to Melaka. Recently, the land owned by KTMB has been given to the state government. Through the state government it was handed over to companies to develop the land alongside this old railway line by KTMB. Along this old line there are hundreds of squatters who have lived there for decades, and their permits, which were recently not renewed, ... I would like to request the views and explanation of the Honourable Deputy Minister: when KTMB handed over the land to the state government, did it take into consideration these squatter residents. Was it stipulated that any
development project, they be given the opportunity to participate so that they will not have to move out, or whether there is a programme to pay compensation to them so that they can move to another place to continue their lives. I have received complaints from residents on the old KTMB railway line. They appeal to the ministry that if the ministry can impose a condition that any development project on the land of the old KTMB railway line must also take into account the interests of the residents who have lived there for decades. That is all, Mr Chairman. I hope the Honourable Deputy Minister can give a little answer.
Thank you, Mr Chairman. Honourable Deputy Minister, I thank you for allowing me to join in debating Supply Head 28. I would like to refer to Item 010000 - Assistance Services, Item 010400 - Maritime, and Item 03000 - Sea Transport in Sabah. Regarding the first item mentioned earlier, I would like to ask the ministry what services have been implemented in the state of Sabah. Specifically, if we look at my Parliamentary area, it faces the Sulu Sea and is indeed suitable in terms of fisheries and marine activities. So, I ask what has been done by the ministry in terms of updating the administration and management for the activities of the Marine Department in the Silam Parliamentary area. Next, in terms of maritime, I was informed earlier that Silam would be made a Maritime office for the East Coast area because its site has already been prepared there. I support this proposal because we want to see how we can train youths or workers who are interested in the maritime field, because the suitability of the bay that exists in the Silam Parliamentary area has long been identified and is very suitable. So, it is good because this will be able to provide employment opportunities to young people in the East Coast area of Sabah, covering from the Silam area itself to the Kalabakan area. For the sea transport item as well, I see that although there is a Marine Department in the Silam Parliamentary area, especially in Lahad Datu, its management is not very orderly. I also do not see their role. So, I propose to the ministry that it take the initiative to establish a suitable jetty to see the role of the Marine Department itself in that area. We know that my own area is indeed heavily involved with sea boats. So, if we make efforts to improve in this respect, it can also bring revenue to the ministry itself. In addition, Item 030300 - Seafarers' Affairs. I see how the welfare of the boat operators in my Parliamentary area, who, as we see, are not very exposed in terms of safety factors. Perhaps apart from those who traditionally engage in fisheries and so on, but we see in terms of tourism activities themselves, if linked to the Marine Department under this Ministry of Transport, they can be developed in terms of the basic facilities available in the Silam Parliamentary area, which will certainly allow us to increase the income of the fishermen or seafarers involved in this motorised activity. Besides that, in terms of navigational safety, I see that the night navigation light markers in the Silam Parliamentary area are still rather lacking. I propose that the ministry take the initiative to add to and further improve the safety standard for seafarers. At its peak, Lahad Datu Port, especially in the 1970s, had many large ships anchoring, especially when they took timber logs itself. So, now we want to develop it again and we hope the ministry can provide basic facilities related to the safety of the seafarers themselves.
One more item touches on road safety. Because the Silam Parliamentary area is located between the east and west links for the state of Sabah, I find that large vehicles such as tankers are often involved in road accidents in the hilly Silam Parliamentary area. We hope the ministry will establish an entry point from the Kinabatangan area to Silam and from the Tawau area to Silam itself. In terms of the schedule for heavy vehicles or large trailers, this needs to be arranged to reduce the rate of road accidents, and at the same time it can control the volume of traffic entering.
We do not want, because I did not have the opportunity earlier, and the Ministry of Works in terms of level, to improve the road system in the Silam Parliamentary area, but I hope the Ministry of Transport can discuss with the Ministry of Works, especially in terms of arranging the entry schedule or traffic movement, especially those involving these large vehicles. Then, Item 090300, namely Air Transport, I would like to ask the ministry about the construction of the Lahad Datu airport. I hope that in this Ninth Malaysia Plan we can implement it, and I have been informed that in a short while the ministry may come to my Parliamentary area for activities, whether a launch or a groundbreaking. I have not yet been able to know the actual details, but I thank the ministry very much, and hopefully with the establishment, especially the construction of this new airport, it will further expand economic activity in the Silam Parliamentary area. This will add to the entry points besides Sandakan, Tawau and Silam itself, and especially Lahad Datu will become the main focus for the new air route. Perhaps once this new airport is in place, I will propose to the government that there be direct flights from Lahad Datu to Kuala Lumpur to reduce the red tape or transport problems themselves, because at present we often face issues with aircraft that are cancelled at the last minute and so on. [The Deputy Speaker (Datuk Ronald Kiandee) chaired the Committee] So, I hope the ministry will give attention to this matter, and thank you also because the new TR700 aircraft is the only flight used through the Lahad Datu and Kota Kinabalu area, because the volume of passengers coming to Lahad Datu and going back has increased. So, we hope that perhaps in terms of the construction of this new airport it will further increase the rate of tourist arrivals to the East Coast area of Sabah. Thank you, Mr Chairman.
Thank you, Mr Chairman. I would like to join in touching on matters concerning this ministry, namely the Eighth Programme of the Ministry of Road Safety. It is stated here that the number of schools for the Road Safety Programme is more than 7,600 schools conducting road safety education. I would like to ask the ministry what exactly is being taught and what is the effect of this road safety education, because it is given to school students. If there were success, certainly we would not see a group of young people who are still in school or who have just left school becoming drivers or motorcycle riders who create a major problem on our roads, namely these mat rempit youths. If they were given awareness and they felt the price and value of their lives, as we should have educated them, certainly this matter would not occur or could be resolved. This is because we see other solutions being implemented, such as enforcement of roadblocks and also no small number of arrests
...pun mengurangkan kerenah daripada kumpulan mat rempit ini. So I would like an explanation from the ministry as to which ministry is actually responsible for educating them. In this matter too, we have a group of people who find it very difficult to accept changes in behaviour while driving or while in a vehicle. For example, the wearing of seat belts by the driver and front-seat passengers, and now we have extended this to passengers in the rear seats. If enforcement at the front has not been very successful, what is the ministry's hope for the implementation or the compulsory wearing of seat belts in the rear seats? If we look in some countries, when we drive alongside another car in which the occupants are not wearing seat belts, all the other vehicles will look disdainfully at any driver or passenger who is not wearing a seat belt. We see this practised either in Australia or Great Britain. So, awareness is so high that it creates a feeling of unease, shame and even fear among any party who deliberately or forgetfully fails to follow this law. However, in our context in Malaysia, it seems there is no sense of responsibility towards oneself and the safety of passengers in this practice. So, where have we gone wrong in building awareness and knowledge among our population in Malaysia, especially starting at the school level? I saw an advertisement on seat belt wearing for rear-seat passengers on our television. I think, in terms of the advertisement, it is good, it has had an impact there, in our hearts, but does the ministry make an assessment as to whether there has been some change in terms of attitude and also attitude or behaviour after these advertisements have been carried out for some time? Otherwise we will see the amount of money allocated for the campaign or for this road safety, Item B.28, amounting to RM12.5 million, will become wasted. So, we hope that studies will be carried out to evaluate the effectiveness of these educational programmes. Next, I would like to ask about enhancing the capacity of KTMB amounting to RM1.85 billion. This is a large sum which I think is allocated to extend the double tracking system, perhaps. This possibility may be explained by the minister. I would like to ask in terms of enhancing the capacity of KTM in general. Our railway system began even before independence. The route from north to south and branching east at Gemas is the result of construction before independence. This is pre-independence, meaning it is very old, the British era. The era when our country was not yet advanced, but we were able to provide a railway system that was so long, yes. We are also not sure where we obtained the financial capacity to build that system, but that was the system then, and now the possibility is that only additions are made in the Klang Valley, as contained in this paper. My question is, in terms of strengthening this capacity, has there been no thought, for a medium and long-term period, on how to make a bypass route to the east that does not necessarily have to go down to the south first, but branches off, for example, at Mentakab to go directly to the Klang Valley? This is so that the journey from my constituency in Kuala Krai to Kuala Lumpur does not take as long as nine to 12 hours. Perhaps five to six hours would be better, easier and more profitable for us, including also transporting the natural resources found on the East Coast to the West Coast, including to Port Klang. So, has a study been carried out on the improvement of this infrastructure, which I think, if not now, must be pursued in the future.
In addition, in terms of the expansion of the LRT routes in the Klang Valley. We see that there are indeed plans to add routes. So we would like an explanation from the ministry. Apart from the existing networks, namely STAR and PUTRA, are there any other plans, especially by these two companies or other companies established to add routes so that the presence of the LRT can truly help the movement of our population in a more meaningful way, as in
some advanced countries. The existence of such a system facilitates movement to the extent that it can reduce costs and also time for movement, compared with us, who already have one but which is not yet sophisticated enough. So I would like to ask the ministry whether there is in the ministry's plan to carry out a study and subsequently build such infrastructure. Thank you, Mr Chairman.
Thank you, Mr Chairman. I do not have many matters, just a few. Firstly, Item 10000 Supplies and 20000 together, concerning a project, namely the Marina Project at Sungai Muar, which was completed two years ago but until now has not yet begun operations. So I would like to ask when this project can operate? Secondly, Item 80000 - Road Safety. I welcome the suggestion from the Honourable Member for Kuala Krai just now, which touched on road safety education. However, I would like to extend or lengthen that question. What steps are being taken by the Road Transport Department (JPJ) and by the Road Safety Council itself towards school pupils or students who ride or drive motorcycles without a licence or without complete road tax. In other words, Mr Chairman, if we talk about education, yet at the same time we encourage these school pupils or students to ride motorcycles without a licence and so on. In fact, we have already been educating them from the beginning not to respect road traffic laws. If from the beginning we do not monitor them or we let it be, I mean the education just now must also include cooperation with the school. If possible, enforcement must also reach into the schools. This is because these pupils or students, when they leave school later, will already be accustomed to breaking road traffic laws. Meaning they will continue to break road traffic laws forever. Secondly, Mr Chairman, the same matter also concerns the speed limits on highways, the North–South Expressway and so on. I would not propose a speed limit higher than 110 kilometres. However, what I want to emphasise here is the slowest speed limit, because there are vehicles driving on the highway with a speed limit of 110 kilometres per hour, but they are driving at 60 kilometres per hour. This is dangerous to other vehicles. On a three-lane road, they drive not only in the outer lane, but also in the middle lane at a dangerous speed, extremely slow, namely 60 or 70 kilometres per hour. Mr Chairman, is there a plan from the ministry regarding this speed limit? I mean the slowest speed permitted on our highways as is happening in foreign countries at the international level. Finally, Mr Chairman, regarding dredging works. Head 3600 Development. I would like to ask and know, so far or up to now, what is the progress of the dredging works at the Sungai Muar estuary? Whether they have been completed, and if they have been completed, whether all the problems relating to fishermen who have to face mud and so on have been resolved or not yet. But what I want to know further is the progress of the Sungai Muar dredging works up to now. That is all, thank you.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I stand to debate several items contained in the budget that has been tabled, namely Items 060400, 090400, 00200, 00800, 01300. Mr Chairman, firstly regarding 060400, namely Driving Tests and Licensing. So I would like to draw the attention of this august House. What is happening now is in rural areas, concerning licences for drivers who are already of an older age, and some of them do not have the ability to take part
in the written test. Sometimes even after two or three attempts they still do not pass. I express my thousand thanks to the Ministry of Transport which conducts bulk tests to give licences to these people. From the L licence up to the full licence, so that they can drive on the road. So I hope the ministry will add more of such programmes. Secondly, I would also like to draw attention, as was mentioned by the Honourable Member for Ledang, concerning school children or pupils, especially secondary school students, who drive without a licence. We feel there needs to be a mechanism on how, alongside educating them in safety, road rules and so on, they can go to school without disturbing their parents' work. Perhaps a temporary licence and so on. Next, regarding Item 090400 on bus stations. I would like to draw the attention of the ministry, namely in Padang Terap, concerning the bus station at Pekan Kuala Nerang. Until now it has still not been completed. I ask the ministry to give some attention. The next items, relating to 00200, 00800, 01300, which I believe relate to KTM, LRT, rail repairs, integration projects, LRT stations and so on. In the Ninth Malaysia Plan, I see that a great many allocations have been provided for all of those mentioned above. However, I would like to draw attention to what is the main basis of the government in allocating the budget to proposed mega projects and the addition of the existing LRT network. So that we also identify the areas that have or... or whether the ministry only looks at areas that have potential for additional users. But those without potential are not included. Do they, or does the ministry, only take into account the expected increase in LRT users alone, or the expected additional users of the existing LRT, or the population density in a residential area, without also considering how the LRT or public transport network must also reach the rather isolated areas, or those quite far away in the villages and so on. This is because they also need a public transport network. Regarding the addition to the existing LRT network, what is the estimated cost of the project? How is it financed? Is it 100% through issuing bonds or debt alone? Before the mega projects mentioned are implemented, I think it would be better for the government to inform this august House of the latest and previous operational and financial performance of the companies operating PUTRA, STAR, and KL Monorail. Now the KL Monorail has been taken over by the government through Syarikat Prasarana Nasional Berhad (SPNB). Is the latest rail service company, which was taken over after operating under a privatisation concept and failed to settle its long-term loans to Bank Pembangunan Malaysia Berhad?
This House should also know what the financial performance of Syarikat Prasarana Nasional Berhad is, especially the latest total of bond debts in the SPNB books. For your information, the assets and also liabilities, including the debt obligations of Putera, Star and Kuala Lumpur Monorail, have been taken over by the government through SPNB, and the operations of the LRT and monorail have been handed over to the same entity to continue its operations. Lastly, I also want to raise what fare structure will be proposed once the project planned by the government just now has been built. So we expect that the proposed fare structure will be based on being people-friendly, not the full cost recovery concept implemented under the privatisation concept, and a not-too-high profit margin imposed by the operating companies. Another matter I want to touch on is 00900, which enhances the capacity of KTM, which I am confident is also included in the allocation of the Ninth Malaysia Plan, namely
relating to the twin-track project from Ipoh to Padang Besar involving 30 kilometres. So this budget is quite large, and what is recorded in the development of Maksud 28 is about RM1.8 billion, but what we understand is about RM12 billion allocated, as reported in the Bursa Malaysia announcement on 25 July 2008, where we were informed that this company will implement this project with the design and build concept. So this may have been partly answered. We hope the government will consider a concept that is more government-friendly in providing allocations, and if we look, if it is carried out as design and build, this requires the government's commitment in providing allocations every year. So a budget of about RM2.5 billion a year to be paid to this contractor is quite a high rate, and I also want to raise why it is not implemented under PFI, which the government mentioned previously, which, if we look, if implemented under PFI, this concept covers design and build, then the government injects finance and so on. Thus, we would obtain this project more safely than being given in the form mentioned in this august House previously, in the form of direct negotiation, namely the design and build concept, and given by direct negotiation to Gamuda MMC. So I think that is all, Mr Chairman, my debate at the Committee stage for the Ministry of Transport. Thank you.
Thank you. In page 681, Item 01500, among the projects cancelled in this Ministry of Transport is the monorail project in Penang. I would like to ask, there are various companies that have made proposals regarding a monorail in Johor Bahru. What is the ministry's view on the plan to build a monorail in Johor Bahru? Will that be continued or will it receive the same fate as the Penang monorail. Next is Item 020300 - Maritime and Port Affairs. Pontian has a long coastline of 40 kilometres, and there is a small town in Pontian called Benut. Historically, Benut was a well-known barter trade port at one time in the past, and I understand that the Ministry of Transport has written a letter to allow a company to develop a barter trade port in Benut. To what extent can that matter be implemented and what assistance can be given by the Ministry of Transport to establish barter trade in Benut. Next, regarding road safety which has been much touched upon by other Honourable Members. How does our national road accident rate compare with neighbouring countries? Is our country worse compared with neighbouring countries, and the main fatal accidents are motorcycle accidents. What is the best formula to overcome this? What about awareness campaigns in terms of speed limits, in terms of the proper wearing of crash helmets, in terms of bright clothing, reflective light? Have those matters been fully implemented, and what about the proposal for motorcycle lanes on roads throughout the country? What is the plan made by the government with the Public Works Department? To what extent will that plan be implemented and to what extent will it be implemented at the places identified as deadly roads in this country? Next is regarding enhancing the capacity of KTM. RM1.8 billion is a large figure, and we want to ask how is KTMB's performance now? What forms of reform are planned with this RM1.8 billion? I would like to ask about one item, namely 01600 - Purchase of KTMB Rolling Stock amounting to RM310 million. What is the method of purchasing this rolling stock? Is it through open tender, open international tender, and which countries do we want to obtain the technology of this rolling stock from? Is it from Japan, Germany or South Korea which is cheaper? What is the method? I seek an explanation from the ministry. I think that is all I want to ask. Thank you.
Honourable Member for Ledang, just now page 373, Item 010000 – Assistance Services. Mr Chairman, what is important here regarding our transport policy is, among others, the safety of sea transport, enhancing efforts, enforcing shipping safety standards and passenger safety, search and rescue capability, and the provision of equipment for implementing the Global Maritime Distress and Safety System. Mr Chairman, here I want to mention piracy at sea. The Straits of Malacca shipping lane: within the 300 kilometres of the Straits of Malacca, every year 50,000 ships pass through this strait, which is one of the busiest in the world. However, unfortunately, the Straits of Malacca has, throughout its history, often been subject to pirate attacks. Records exist from centuries ago, since the 14th century, and also from the Malacca Sultanate and so on, and even now there are still up to 50 pirate attacks every year. At one point there were even more than that, 40% of pirate attacks, that was 2004. 40% of pirate attacks occurred in the straits, and we must remember that in the world, every year, there are up to 276 recorded pirate attack cases. Recently in the Gulf of Aden, Somalia, giant pirate attacks have increased, and here I want to ask the ministry what steps have been taken, for example by the Federation of Asian Shop Earnest.
He did set up a new system, the Information Sharing Centre (ISC). That is one of the systems established jointly by 14 countries in this Asian region. What has happened with this Information Sharing Centre (ISC)? For this year, what is our forecast regarding the number of pirate attack cases in the Straits of Malacca? Here I would also like to touch on this because in our Ministry of Transport, we must ensure the safety of ships at sea, whether in the strait, the Gulf of Aden or in the Somali Sea, that is where we are.
[Menyampuk]
Whatever the problem, whoever else. The Honourable Member for Batu Pahat. What is the problem with the Honourable Member for Batu Pahat, he speaks after the house has been completed. Yes, you are always like that. The piracy problem in the Straits of Malacca is close to Batu Pahat, not far, not far.
Honourable Member, confine it to the Straits of Malacca, don't go to Somalia, it's too far.
Yes, yes. Want to...
Somalia is too far. The Straits of Malacca is fine.
Is Somalia included?
You already mentioned Somalia just now, you've already started mentioning it.
Somalia, it is indeed part of this problem, because although we must, not only the Ministry of Transport, the Ministry of Foreign Affairs and so on are indeed involved. However, Mr Chairman, the latest is that not only Malaysian ships are affected. MISC has two ships, namely Bunga Melati II and Bunga Melati V, which have been seized by pirates in the Gulf of Aden. Both of these in the Gulf of Aden in August this year. Then, because we paid ransom money, the Chairman of MISC does not want us to mention the amount paid. There is news of USD4 million. I don't know how much, but Tan Sri Hassan Merican gets angry if we mention the amount paid. He is afraid it will become an incentive for pirates or an encouragement for these pirates. Look, Malaysia can pay ransom of up to USD4 billion. We can launch more attacks. That's why he is afraid.
However, I do not know what amount was paid as ransom for Bunga Melati II and V. Here, in that area so far, this year there are 64 ships that have been seized and some are still being held. The latest is the super oil tanker Sirius Star from Saudi Arabia, carrying crude oil worth up to 65 million pounds. The ransom demanded by these pirates was 16 million pounds.
Permission to pass, Honourable Member.
The Honourable Member for Arau asks for way, Honourable Member.
The Honourable Member for Arau?
Ya.
There are no pirates in Arau.
Arau indeed has no pirates, but it is close to Acheh, where there are a few here and there.
Achehkah?
Ya, sedikit.
Selat Melaka.
Thank you, Mr Chairman, thank you to my friend from Kepong. I would like to ask the Honourable Member's views regarding the current world security system. When the Honourable Member raises the issue of shipping safety in the Gulf of Aden, and also in the Straits of Malacca, which is already considered unsafe. This is because the problem reflects that countries near the Gulf or the Straits of Malacca appear to be less capable of handling security matters, which should be handled according to the Justice of the Peace rules that we believe in, that we adhere to, that we hold to now. What is the Honourable Member's view on this matter?
The Honourable Member for Arau today has some good views too. That can be accepted. Sometimes there is also good. We accept what is good.
Yes, two more minutes, Honourable Member.
Ya?
Two more minutes.
He is being a bit naughty today. [Laughter]
Penjelasan.
Baik, baik.
About the ransom, just now it was mentioned up to USD4 million in ransom. It appears that the Malaysian Government, even through MISC, is so easily able to pay so much money when pirates demand a ransom. But with the Malaysian people, our government is rather hard-pressed. Even reducing the price of petrol is difficult. Does the Honourable Member agree that we too should be kidnapping any government leaders?
But we practise the rule of law. That is why there are some restrictions, but paying pirates is indeed easier. Paying the people is a bit more difficult.
Honourable Member, one more minute, Honourable Member.
There is still much more to say.
Ten minutes are already up.
If that's the case, then it would be better for us to become terrorists.
No, we do not want terrorists, whether from Arau or from Batu Pahat or from anywhere else, we cannot accept that. We hope all of Malaysia can live in a state of peace, tranquillity and so on. There is no need to use violence or other bad things. Mr Chairman,
Yes, wind up, Honourable Member, finish up, Honourable Member.
I am about to wind up. Here I want to ask the ministry what steps have been taken, apart from the ships of the Royal Malaysian Navy, and what steps are being taken apart from our navy, and also the multinational anti-terrorism force. Has the United Nations indeed been involved? We hope Malaysia will take steps to bring this matter to the United Nations, because we need cooperation from various countries to eliminate pirates in Somalia, which is at war. Although in Arau there is a small war from time to time, the war in Somalia is indeed fierce.
Ya.
The war in Arau is only about becoming Menteri Besar.
For your information, many of my small fishermen have also been kidnapped by pirates, there have been several cases. True.
Di Arau?
In the Arau Parliamentary constituency. Small fishermen, only small sea.
By whose doing?
This is no joke, this is true, Honourable Member for Kepong.
I did not know either, I think this is the first time.
Yes, finish up, Honourable Member.
Finish up, yes. I hope the Honourable Member, the ministry can give an accurate, proper and precise answer, in the process of this august House.
Thank you, Mr Chairman, for giving me the opportunity to join in the debate on Item 060000 – Land Transport.
In my constituency of Sibuti, land transport is only available in the Miri City Parliamentary constituency, P219. So for vehicles or land transport to my constituency, it takes one hour from Bandar Miri to the small town of Bekenu, and another hour to the small town of Batu Niah. It is in this area that land transport is needed to carry passengers from the plantations and estates, and for them to conduct business with the small offices in my constituency. Therefore, I apply for 060100 – Office Management. If possible, please extend or open up to my constituency in Sibuti, in the small town of Bekenu or in the small town of Batu Niah. This is so that offices for registering licences or registering their vehicles can be managed conveniently. Because
vehicles to carry passengers from one area to another are very slow to arrive and charge very expensive fares to them. This is because rural residents do not have their own vehicles and they have to go to the small Bekenu office, which is run by the Post Office with only one officer, and sometimes that office cannot carry out its duties because of system down. This is because of the frequent electricity cuts in that area, since my constituency is small, just a small town. Far from the city. So therefore, if possible, the Ministry of Transport should open a small office in my constituency to register vehicles and motor licences there. Another matter is 060400 – Testing and Licensing of Drivers. I apply for it to be extended to that small town, where we could also open a driving class, because to learn to drive there is only one place in the Parliamentary constituency of 219, in the area near Kuala Beram. It is too far and too expensive for rural people and residents to take part or to obtain a driving licence or to train to obtain that licence. I also feel this is the time to bring to the ministry's attention that P218 Sibuti is a new area, where only a small office run by the district office has become various offices. A registration office, a licensing office, a vehicle payment office and so on. Therefore, can the ministry extend or expand their office in the P218 Sibuti area, placed in the small town of Bekenu or in the small town of Batu Niah. With this office in place, the frequent movement of heavy vehicles such as buses carrying passengers to this area will not open opportunities for the "bas sapu" and "teksi sapu" touts to profit from rural residents. Therefore, I once again appeal that the ministry give us, in the P218 Sibuti area, an opportunity. Thank you.
Honourable Member, I will call two more Members of Parliament after this, then I will ask the Minister to reply. The Honourable Member for Pokok Sena.
Thank you, Mr Chairman. I would like to touch on Item P218 – Ministry of Transport, namely 010400 – Maritime and 020000 – Sea Transport. Regarding sea transport, namely boats or ferries from Kuala Kedah and also from Kuala Perlis to Langkawi. I see that there is a problem when there is an increase in boat fares from Kuala Kedah and also from Kuala Perlis to Langkawi. For me, this is a rather heavy increase. Right now it is RM23 from Kuala Kedah, from Kuala Perlis I did not notice how much. But for me, this is something very, very high, because the cost, if tourists, especially domestic tourists, want to go to Langkawi, they have to spend a very large amount of money. One-way fare, and then over there they have to rent a car. So this is something when we want to encourage domestic tourists. So surely this should be considered between this ministry and also with the Ministry of Tourism in an effort to encourage tourism to Langkawi itself. Likewise with the discount of only RM3 given to Langkawi residents, I think it is rather too small given the very high cost now. So for that reason, I think the fare should have been reduced already, because the price of oil has come down and they do not need the high cost in terms of fuel to operate their boats or ferries. Then I would also like to touch on 060600 – Law Enforcement. Regarding tinted windows, I see that there is still no final word. So far I have not seen, although the Minister, if I am not mistaken, has made several statements that the ministry will make a final decision
on the position of these tinted windows, what percentage of darkness may be used, because this is a problem for vehicle owners. They go to a shop to have tinted windows fitted, the shop says it is allowed. When they buy a new car and fit tinted windows, it is said to be allowed, but in the end we face problems with JPJ and also the police in terms of legal action. I ask the government for a final decision so that the problem that car users have been waiting for can be resolved. Moreover, for some cars imported from abroad, especially cars like the recon, for example, they come with windows that are dark, which sometimes do not meet the requirements of the law in Malaysia. So once again I ask for a final decision on law enforcement regarding tinted windows. Finally, 080000 – Road Safety. Earlier we already touched on this at the level of the Ministry of Works regarding road accidents, as done by the Malaysian Institute of Road Safety Research (MIROS), which states that there are very many accidents, a very large number at night. Night-time travel from 12 midnight onwards.
So there is a conflict between the decision of the Ministry of Works and these concession companies to reduce the 10% rebate from the original toll price, and there is a worry that people will wait until night to travel, whereas at night it is human nature that sometimes they get sleepy and so on. This will certainly increase road accidents. What I find problematic is how the Ministry of Works cannot see that there is a study that has already been done by MIROS, which is a government agency itself under the Ministry of Transport. It should have been coordinated. That means before the decision to be made for the 10% rebate, its effects should have been examined, as I said earlier, that the study done at USM is also the same, which was done by MIROS, states that there are very large numbers of accidents, and the Minister of Transport himself made a statement asking PLUS and the Ministry of Works to re-study the rebate. We want that study to be carried out so that the people or users of this highway can benefit from the reduction of the rebate. For that reason, we propose that the rebate be not only for night, but throughout the day, which of course can be utilised by more users. However, on this issue of safety, it seems there is no coordination, and I would like to propose that matters relating to toll fares and safety should be placed under one single ministry. So tolls should be placed under the Ministry of Works, and safety should be placed here. So I also cannot understand how this information cannot be coordinated so that a decision like the one I mentioned earlier can be known in advance by the Ministry of Works. So I hope that the study mentioned by MIROS can be taken up by the government, and I ask the Ministry of Transport to make a stronger push, because this is a road safety problem, and at the same time the Ministry of Transport should ask the government and support all of us so that the rebate is not only from 12.00 midnight to 7.00 am, but for 24 hours for all types of vehicles. Thank you.
Honourable Member, I apologise, I cannot give to everyone. I can only call one, the others may interject as appropriate. I invite the Honourable Member for Jasin.
Thank you, Mr Chairman, I have waited a long time, Mr Chairman. Firstly, I want to discuss Item 010400 – Maritime. The Straits of Malacca is in fact the busiest shipping route in the world. To ensure the safety of all ships, the ministry should indeed cooperate with other ministries, whether the Ministry of Defence, to ensure that this shipping route is safe. So far we would like
inform that the Straits of Malacca is the safest strait in the world. Although we do not have, as Honourable Kepong just mentioned, an ISC that can link the enforcement officers of the navy, the army and other agencies such as the Customs Department, the Fisheries Department, the Immigration Department and so on, what I actually propose is that the government set up a monitoring system, namely an Information Sharing System among all enforcement officers, so that swift action can be taken if there is any possibility of an incident. So far we have only been informed of two incidents, and even those occurred after the ship had anchored, when pirates came. So, for the ships that have sailed so far in 2008, there have been no cases. Both occurred here in Melaka because of the very busy shipping lanes; all we get is the pollution. We hope the ministry will carry out monitoring to ensure that all ships using the Straits of Malacca do not discharge sludge or do sludge discharging at sea, and if there is any incident, because a collision occurred some time ago, we hope the ministry will take swift action to ensure that it does not affect the coastal areas, and even the fishermen. Secondly, under Item 08000, namely Ports. In the past, during the Melaka Sultanate, the port of Melaka was famous across the world as the Venice of the East. At present, we also have ports, but they are backward ports, ports that are neglected by the Port Klang Authority, which oversees all ports. When I was in Melaka, I brought several foreign investors who wanted to invest heavily in Melaka and who needed port facilities, but when they saw the Tanjung Beruas Port, they ran away. This is because the port at Tanjung Beruas has at this time been privatised to a company which has let Tanjung Beruas become a very neglected place, and it is hoped that the ministry will take over and redevelop the Tanjung Beruas Port so that it can generate income for Negeri Melaka. Next, I go to Air Transport - 010500. The Batu Berendam runway will be enlarged and will be completed by the end of 2010. At present only Fokker aircraft can land, and we hope that in future the 737 and subsequent Boeing aircraft will be able to land at Batu Berendam airport; at the very least, the government, if possible, should make the Batu Berendam runway a cargo hub as well as a passenger runway. Next, for land transport 010600, enforcement must be stepped up so that all types of land transport, such as school buses, factory buses and vans, must really comply with safety standards.
Penjelasan.
Sila.
Thank you Mr Chairman, thank you Honourable Jasin. Regarding the problem of land transport just now, and the mention of school buses, I would like to ask for Jasin's views and perhaps the ministry's, because the problem now is that students who ride motorcycles and so on are involved, when in fact they want to go to school but there are no public facilities. I want to bring up my own area, like Maran, Sungai Jerik, where there is none, and so on; there are no bus facilities. I ask that we propose to the ministry that it conduct a study on where and what needs there are for this land transport, not only in the towns. I think Jasin, in the towns there are already very impressive bridges, roads built in multiple layers, above and below ground, and so on, there are already quite a lot, but in the rural areas they are left behind, even though we receive very strong support from the rural areas. So I ask the ministry, please, Honourable Jasin, my view is this: ask the ministry to conduct a study on what we need to do to ensure that this land transport, especially public facilities, is provided in the ka-kawasan luar bandar or the small town areas. Thank you.
Thank you, my friend the Honourable Maran, I very much agree. If possible, include it in the speech text now to ensure the safety of our children and our passengers. If not, if we only talk about improving our system, it will not be achieved. What is happening at this time is that school buses and factory buses are in a state that is really very sad. They have nothing, I think if we check properly they do not meet safety standards for passengers. We do not count the cost, the cost is actually secondary. But what is important now is safety and services that are truly of quality. Next, the government announced an allocation of RM4 billion to "improve" the transport system in our country. I request that, if possible, it not be centred in Kuala Lumpur only but also give attention to Melaka.
Speaking of safety problems, I want to mention the problem of... Thank you Mr Chairman, road safety. Now accidents are happening constantly, even though we have provided education and so on, accidents are rampant. In the past we had a Road Safety Council, where at the central level, state level and district level, I notice that now, Mr Chairman and also Honourable Jasin, attention to these districts has decreased a little because sometimes we only hold programmes seasonally. What is wrong with us proposing to release allocations? Money can be found, Mr Chairman, but the lives lost, our society cannot find. Perhaps this opposition likes people to die, I do not want that. What is wrong with us finding money and giving it to the districts and also to the Parliament, except for the opposition; we hold programmes, I am ready. [Laughter] [Applause] We, Barisan Nasional, are ready to do it. Thank you, I ask Honourable Jasin for his views.
Honourable Member, please wind up.
Thank you Mr Chairman, before I finish, I would like to express my thanks...
Why, does the opposition not pay tax?
I would like to thank Mr Chairman, who was very fair, even though I waited many times, Mr Chairman gave me the opportunity. Finally, I want to say one last thing, namely 08000 - Road Safety. The accident index keeps rising; areas where accidents often occur we consider to be death zones. What actually is the government's integrated action, not only by the Ministry of Transport, but also the Police and other ministries, so that they hold a consultation to ensure that these areas called death zones become safe areas. Every time we have festive days, all kinds of accidents occur. I feel I have a lot more to say, Mr Chairman, but I respect the time. Thank you, Mr Chairman.
Thank you Honourable Member. The Honourable Minister will reply after the oral question-and-answer session tomorrow. The House resumes its sitting. [Deputy Speaker (Datuk Ronald Kiandee) presiding
Honourable Members, the sitting of this House is adjourned until 10.00 a.m. on Tuesday, 25 November 2008. The House was adjourned at 9.32 p.m.