Dewan Rakyat · 30 November 2009
15th Parliament, session 2, meeting 3 · 721 turns · 63,237 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar) presided over the Sitting]
Oral Answers to QuestionsQuestions
1. Datuk Bung Moktar bin Radin [Kinabatangan] asked the Minister of Transport to state the proposals for adding flight schedules among the airlines AirAsia, MAS and MASwings, particularly for the Kota Kinabalu – Sandakan area, Sabah.
Bismillaahir Rahmaanir Rahiim. Assalamualaikum warrahmatullaahi wabarakaatuh. Mr Speaker, thank you to the Honourable Member for Kinabatangan for the Honourable Member's concern about issues and the interests of the people. For the information of the Honourable Member, so far Malaysia Airlines and AirAsia operate 28 flights a week, namely MAS with 14 flights a week and AirAsia also 14 flights a week, or an average of 4 flights a day. However, if there are indications that there is an increase in terms of the passenger market volume, MAS and AirAsia are always ready to give consideration. So far, for 3 months, namely August to October 2009, the average load factor for MAS is 63 per cent and for AirAsia is 59 per cent. It is also informed that after the process of rationalising domestic services, and as commercial airlines, their decisions are subject to market indicators or actual market demand. However, as an alternative, this flight route also provides Rural Air Services or RAS services using turboprop aircraft of the ATR and Fokker 50 types operated by MASwings, with a flight frequency of 28 times a week or an average of 4 flights a day, for the convenience of residents in Sandakan and the surrounding areas. This means there is a total of 56 flights a week, or 8 times a day, for the KK-Sandakan-KK route, including the addition made on 1 July 2009. Thank you.
Thank you, Mr Speaker, and the Honourable Deputy Minister. I have no doubt about the commitment of the two airlines, MAS and AirAsia. What is in question is that the government has granted permission to these two airlines to operate and compete openly, but this does not mean they may also compete by setting schedules according to their own preferences. They must look at the needs of consumers. The needs of customers must be given priority. For example, the flights of MAS and AirAsia – Kota Kinabalu–Sandakan. When MAS sets its schedule at 7.30 am, AirAsia sets it at 7 am. MAS sets its schedule at 12.55 noon, AirAsia at 1 pm. Between the morning and noon there are no flights, and the same applies to the afternoon. Between 10 am and 1 pm there are no flights. Between 1 pm and 5 pm, during that time there are no flights.
So, this is what really worries passengers in between... this is only what I have said about Kota Kinabalu and Sandakan. We do not know about other destinations, which may be similar. So, this causes inconvenience to passengers because they have to follow the schedule set without any choice.
Yes, the Honourable Member's question.
The question is whether the government and the ministry intend to call on these two airlines to revisit their flight schedules so as to provide convenience to passengers and customers in the future? Thank you.
Thank you to the Honourable Member for Kinabatangan for that remark. For the information of the Honourable Member, in fact there are 8 flights operating every day between Kota Kinabalu–Sandakan and also Sandakan–Kota Kinabalu. It is true that Malaysia Airlines and also AirAsia fly at almost the same times every day, namely at 7.10 am for MAS to Sandakan and AirAsia at 7.05 am, while at noon at 12.40 pm and AirAsia at 1.10 pm. However, I would like to explain here to the Honourable Member that in fact MASwings has provided the first service at 8 am, the second flight at 3 pm, the third flight at 6.15 pm and the fourth flight at 7.50 pm. The Honourable Member's allegation is indeed something with a basis, but there are also reasons provided. Based on that, in fact the decision of airlines to operate flights at a certain time for a certain route depends on the following factors:
(i) analysis of the commercial demand of the passenger market, namely where the selected flight times are based on peak periods with high passenger volumes in a day; (ii) in and out connectivity with other flights within the airline's network, whether domestic and international; and (iii) MAS and AirAsia airlines always ensure optimal and efficient use of aircraft, and in determining their schedules they use those considerations. However, Honourable Member, the ministry will convey the Honourable Member's remark to them, if there is an opportunity to improve the schedule.
Yes, Kota Melaka wants to ask about this Sandakan matter? Please, Honourable Member.
Thank you, Mr Speaker. The Batu Berendam Airport in the state of Melaka has been upgraded so that Boeing 737 and also Airbus A320 aircraft can land, and since Melaka is also a tourism state, just like the states of Sabah and Sarawak. To bring these three states closer together, has the ministry conducted a study on the need for destinations between the states of Sabah and Sarawak to be established from the state of Melaka? Thank you.
Thank you, Honourable Member...
Honourable Deputy Minister, do you have the option to answer or not? This is actually a question on the aircraft runway.
This matter is a specific question, but I would like to say here that the Ministry of Transport will study it at all times and also look at whether there are market opportunities, particularly for companies wishing to operate, whether Firefly Company and also other companies. They may conduct studies to do so. [Question No. 2 – Honourable Member Tuan Chua Tian Chang (Batu) was absent]
3. Datuk Seri Azalina binti Othman Said [Pengerang] asked the Minister of Youth and Sports to state regarding the concept of "1 Belia 1Malaysia" and whether the government intends to continue providing empowerment assistance to youth associations in 2009.
Thank you, Honourable Member. For the Honourable Member's information, the concept of "1 Belia 1Malaysia" is an initiative to produce a generation of youth who are united, have integrity, high morals, and the capability to build a more peaceful, progressive, safe and prosperous nation that is competitive in meeting global challenges. This concept also aims to strengthen the spirit of unity and cooperative ties among youth of various races in this country, in support of the aspiration of the 1Malaysia initiative, based on the Supremacy of the Federal Constitution and the Principles of the Rukun Negara. For the Honourable Member's information, in 2009 the ministry still continues to provide empowerment assistance to registered youth associations or organisations, and the ministry also provides assistance in the form of implementing the activities of youth associations or organisations and implementing leadership and organisational management training programmes for youth organisations. That is all, thank you.
Honourable Deputy Minister, my next question is that if we look at the total of 26 million Malaysians, about 11 million Malaysians under the age of 40 can be categorised as youth. Therefore, if we look at the number of youth associations in our country, there are 6,950 associations and the total membership is 1.9 million. My question to the Honourable Deputy Minister is, in implementing the 1Malaysia initiative through the "1 Belia 1Malaysia" concept, does this not place greater emphasis on expenditure for the empowerment of youth associations being given priority, rather than expenditure on physical developments under the ministry? For example, the construction of Rakan Muda Complexes and sports complexes. Thank you.
Thank you to the Honourable Member. It is true that when we take into account the entire population, the youth are very numerous. So, for empowerment, one way to help, especially our youth, is to attract their interest, especially to youth associations or organisations to carry out activities for the good of the youth. So at present, the rate of empowerment assistance for youth organisations, and contributions from the Ministry of Youth and Sports, have been given to village-level youth associations: if successfully applied for, they will be given about RM3,000; district-level youth associations RM4,000. For state-level youth associations or District Youth Councils RM5,000; national-level youth associations or State Youth Councils RM10,000. For the ministry, it is not only using various methods or programmes to attract our youth to take part in various activities, which is why various programmes, including the ministry, have introduced "1 Komuniti 1 Persatuan" to attract more youth to take part. It is true that the Ministry of Youth and Sports is striving to obtain more funds so as to provide assistance to youth.
However, this does not necessarily meet the needs, because the funds are limited, but for associations, they must strive to obtain those funds. That is also one way to shape our youth for a more brilliant future and to manage associations better. So, apart from that, regarding facilities. I am of the view that if we provide funds for youth to carry out activities, we should also provide various facilities or places so that they have a place to carry out activities. That is also important for the ministry. That is all, thank you.
Thank you, Mr Speaker. Ten years ago, the government spent millions of ringgit in proclaiming and empowering youth and their associations through the Rakan Muda Campaign, and the results went nowhere. So our teenagers and youth are increasingly in a worse social state today, and youth associations are becoming increasingly sluggish, especially as the problem of Mat Rempit has still not been resolved to this day. The closeness of youth associations is unclear, inter-racial youth programmes are rarely implemented, and what is the Minister's assurance that this "1 Belia 1Malaysia" will not become mere rhetoric and a waste of the people's money. Thank you.
That is not true, Honourable Member. The ministry always takes care regarding youth associations. What must be remembered is that the youth referred to, or under the ministry, are those from 15 years old upwards and up to 40 years old, meaning there are still many other reasons why our youth have problems, not solely dependent on the Ministry of Youth and Sports. The Ministry of Youth and Sports has indeed taken various steps, the "1 Belia 1Malaysia" concept so far, and that is why I say the government does not want to leave anyone behind. So youth or youth associations must play a role, including the Honourable Member, so that the programmes implemented by the ministry are well received. If there are weaknesses, please inform the ministry. We understand this problem has happened before, but what is important is that we hope our youth, regardless of race, can benefit, and the ministry has focused on three main elements to educate youth, for example:- (i) leadership; (ii) skills; and (iii) entrepreneurship.
So, we hope that the expenditure that the Honourable Member referred to, we indeed use it as well as we can. So, we hope to get help, especially from all parties. That is all, thank you.
4. Tuan Tan Tee Beng [Nibong Tebal] asked the Minister of Home Affairs to state how many Malaysian citizens still hold red identity cards. Can the ministry provide a current figure by state breakdown?
Thank you, Mr Speaker. I thank the Honourable Member for Nibong Tebal for submitting the question. For the information of the Honourable Member and also the august House, the red identity card is issued to a person who is not a Malaysian citizen but who is permanently resident in Malaysia. The number of those holding red identity cards as of September 2009 totals 374,500 persons. For holders of red identity cards who were born in Malaysia, their number is 64,731 persons, and the breakdown by state is as follows:
| State |Number (Persons)| |----------------|-------------:| |Sabah | 12000| |Selangor | 11307| |Perak | 6589| |Johor | 5509| |W.P Kuala Lumpur| 4906| |Kedah | 2822| |Pulau Pinang | 2209| |Pahang | 1981| |Negeri Sembilan | 1947| |Kelantan | 1295| |Melaka | 789| |Sarawak | 771| |W.P Labuan | 653| |Perlis | 326| |Terengganu | 307| |W.P Putrajaya | 17| |Others | 11303| |Total | 64731|<END_TABLE_MARKER>
Thank you, Honourable Minister.
Honourable Member for Nibong Tebal. You need to wait a moment, Honourable Member.
Okay, all right, all right. Thank you. I thought only one person would ask. Okay, thank you to the Honourable Deputy Minister. My supplementary question is whether the government has new methods or a more complete or advanced system to make it easier for the people when applying for a new IC within a shorter time, and also to provide facilities for those who do not have sufficiently complete or supporting documents, especially for children who are about to enter school, and also the Indian community in rural areas and estates. Here I would also like to ask the ministry whether we will once again face a case, an incident that occurred in September this year, when a person whose identity card was blue, an elderly citizen, was only completed and received after he had passed away. This is my question, thank you.
Thank you, Mr Speaker. In the context of the red identity card, Mr Speaker, we issue it to permanent residents, and once they have obtained a permanent resident certificate, there is no problem for the National Registration Department to issue this red card. As for the issuance of the red card, we do not have a large backlog to issue this red card, because it is only aimed at permanent residents, Honourable Member. So, in terms of the system we have, I think the system we have made for the issuance of the red card is a quick and easy system to issue. Thank you.
Thank you, Mr Speaker. I thank the ministry for its answer regarding the people holding this red card, which totals 12,000. So, there is one specific question that I will ask the ministry. This is a person of Chinese descent but he is considered a person who has long lived in Sabah. I know this person lives alone. His name is Wong Teck Ming, who has several children.
One of his children named Joane Wong Yen Szi, who is studying at school, aged 15, received a letter from the ministry through letter MKDN/2-MHEDN Jilid 4 stating that his child is not eligible to become a Malaysian citizen. When this student applied to renew his passport, he had a blue identity card. His birth certificate number is 322/94 dated 120894, aged 15 years. I am very surprised. I met at my house...
Ask your question, Honourable Member. Honourable Member, your question. Her question.
Because this is a specific matter.
I know it is specific; it should be concise and specific.
So, I ask why the ministry rejected this application when this child has a blue identity card. The other child is still a Malaysian citizen. I request an explanation of why this happened? So, perhaps many more people are facing problems like this.
Thank you, Mr Speaker. From the question asked by the Honourable Member for Putatan, it focuses on the issuance of Malaysian citizenship certificates. It is not related to the identity card problem. So, however, regarding the problem of the case that has been stated by the Honourable Member, as there is no information available to me, I will meet to obtain certain reference numbers from the Honourable Member, and I myself will ensure that I obtain the problems faced by this applicant. However, I would like to state with regard to citizenship that it is not automatically granted by the government, it is a matter of the government's discretion. Thank you. [Question No. 5 – Honourable Member Tuan William @ Nyallau Anak Badak [Lubok Antu] was absent]
6. Tuan Haji Mohsin Fadzli bin Haji Samsuri [Bagan Serai] asked the Minister of Science, Technology and Innovation to state: (a) the number of disabilities that have occurred among workers and residents around the Bandar Baru Bangi area near the Nuclear Energy Centre; and (b) the form of guarantees and allowances for workers at the centre.
Thank you, Mr Speaker. Waalaikumussalam warahmatullaahi wabarakaatuh and Happy Eid al-Adha. Mr Speaker, in answering the parts of the question: (a) I will focus or broaden this question in the context of activities related to the Malaysian Nuclear Agency, because the question is rather general. So, for the information of the Honourable Members, there has been no case of disability among residents around Bandar Baru Bangi or workers at the Malaysian Nuclear Agency that has been reported by the Ministry of Health Malaysia (KKM) as a result of the agency's activities. The activities at the Malaysian Nuclear Agency have been proven not to have any negative effect either on the health of the surrounding residents or on environmental well-being.
This evidence is based on the results of environmental monitoring that has been carried out continuously since before the agency's facilities began operating in 1982. The monitoring covers the analysis of the content of radioactive material in samples of air, water, soil and vegetation in the surrounding area, including throughout the Bandar Baru Bangi area.
The results of this monitoring have proven that there has been no increase in the content of radioactive material in the surrounding area compared with the situation before the Malaysian Nuclear Agency began operating. To ensure public safety and environmental well-being, all research facilities at the Malaysian Nuclear Agency are equipped with equipment such as air filters and facilities for treating liquid and solid radioactive waste to prevent any release of radioactive material into the surrounding area. Since the agency began operating, all liquid and solid radioactive waste has been treated and stored within the agency's own complex and has not been released outside the complex. All safety measures at the Malaysian Nuclear Agency, including those for the safety of workers, members of the public and the environment, are constantly monitored through the agency's own internal audit system and also by the relevant national regulatory agencies, especially the Atomic Energy Licensing Board and the Department of Occupational Safety and Health. Audits, or with permission, peer reviews of the agency's operational safety by the relevant international agencies, especially the International Atomic Energy Agency, are also carried out from time to time. Peer reviews by experts from regional countries have also been carried out under the framework of the Forum for Nuclear Cooperation in Asia, or FNCA. All safety measures at the Malaysian Nuclear Agency are also necessary to meet the country's obligations under various regional and international nuclear treaties, conventions and agreements, including the Southeast Asia Nuclear-Weapon-Free Zone Treaty, which also covers the safety aspects of nuclear activities to avoid negative effects on neighbouring countries. As for the question; (b) Mr Speaker, Nuclear Malaysia provides the usual guarantees and allowances to government employees. Although some of the agency's staff who are defined as radiation workers, with permission, radiation workers, are eligible to receive an additional 14 days of leave per year. For staff who carry out the duties of operators of the research nuclear reactors located at the agency, a special eligibility allowance of RM150 a month is given, because all reactor operators must undergo additional special training conducted by the agency itself before being permitted to operate the research reactors.
To ensure there is no negative effect on their respective health, all staff of the Malaysian Nuclear Agency who are defined as radiation workers undergo regular health examinations. These medical examinations focus on aspects specific to identifying any effects of radiation, or radiation, on the blood cells and bodies of the staff concerned, and no negative effects have been found so far. Thank you, Mr Speaker.
Thank you for the reply just now by the Deputy Minister. It certainly sounds nice when we hear the assurances that have been given. True, if we look at the assurances given, various methods have been put in place, but what I want to remind everyone is that radioactive radiation, we find, will involve the chromosomes and genes, and the chromosomes will be affected, and we find that these genes and chromosomes will take time, not today. If we plant bananas or plant peanuts, immediately within three months, or if we plant bananas for nine months, we will know the effect, but for humans. We will find that when the genes or chromosomes later become damaged, they will lead to Down syndrome, and do we want to see, if we observe how far the existing studies go, that the effect takes a long time. That is, if we observe its effects, especially in schools, if we observe, if a child is seven years away, only then will we see the disability.
Honourable Member, the question, Honourable Member.
Yes, that's right. Indeed that is our question, I want to share it.
I know, Honourable Member.
Yes, yes. So, what I want to state a little is that only after seven years will we know how his IQ turns out, all of it. So, what was provided by the Deputy Minister... [House in uproar]
Be patient first. Patience, patience, just a moment. Just a little.
Give me a chance, lah.
Just give me a little chance.
Yes, give me the opportunity.
Yes, this is the question coming out now. Okay, the government said there was nothing. Right, we want to know how far the couples who worked earlier have offspring, how many offspring they have. Sometimes we notice that because of the damaged chromosomes, that is, they are infertile, infertility. Okay, okay, the term mandul. So how many offspring are there.
That's enough, Honourable Member. Minister, please answer.
Okay, thank you.
If I didn't laugh, didn't smile, it wouldn't be funny, Honourable Member.
Thank you, Mr Speaker. Honourable Member for Bagan Serai, I am also not quite sure about the question, what you want to ask, but if it relates to research...
No need, Honourable Member. If you're not sure, no need to answer, Honourable Member.
[Laughter] I will just say that from the registry we received from the Ministry of Health, namely the 2006 data, if we look at Selangor alone, the number of cancer cases registered was only 170 people across all hospitals in Selangor, and if it is connected with what was said earlier, it is caused by many things not only related to many factors that cause cancer. In terms of diet, our way of life. It is not only caused by what was referred to. Perhaps what is linked to the activities of the Nuclear Agency, nothing has been proven so far from the reports we have received from the Ministry of Health. So the study mentioned, unless supported by facts, perhaps we can answer more specifically to what was raised by the Honourable Member for Bagan Serai. Thank you.
Honourable Member, the question just now was actually good. It was asked whether a comparative study was done between people working inside the surrounding area and the entire Malaysian population, the differences, the effect of certain specific diseases. Honourable Member for Lipis, please.
Thank you, Mr Speaker. Honourable Deputy Minister. So if we look at Chernobyl, until now it has become a forest, if one may say a ghost town in Russia. In America, I read that their scientists or nuclear energy centre dug into a mountain to store, with permission, radioactive waste and so on, inside that mountain, and until now there has been no new study or finding on how to recover this waste or treat this waste. So, my question is, how far have the studies or study findings been carried out by the Atomic Energy or Nuclear Malaysia to treat the waste stored, the radioactive waste stored, which is said to be stored in Bangi itself in containers. We are worried that if it leaks there will be problems, including me, because I live near Bangi. That is all, thank you.
Thank you, Honourable Member for Lipis. Mr Speaker, allow me first of all to explain in terms of monitoring. We have two ministries or agencies that are related. One, the Nuclear Agency or Malaysian Nuclear Agency, and the other, the Atomic Energy Licensing Board, where monitoring by the Atomic Energy Licensing Board, they will carry out monitoring every four months, whether regularly or by spot check, of the nuclear agency involving their nuclear activities, including storage and storage, as we well know, there is a lot of equipment related to nuclear, including medical equipment and so on, and when that is stored, over time it will naturally disappear once the equipment is finished. Therefore there is no longer any radiation effect. Another is what is called real-time monitoring using the environmental radiation monitoring system, or ERMS, with permission. We have this equipment to monitor in real time and it will be done online to alert our relevant agencies to the occurrence of an unusual radiation release, outside our existing base data. These devices are located in Kudat, in Sri Aman, at Nuclear Malaysia itself, in Johor Baru, Kuantan and the closest one at Cuping. Not "cuping" as in near the ear, mind you, Cuping near Perlis.
So that is what we have. What I mean is we already have the equipment to monitor in real time, whether there is a radiation leak or not. What we do is monitor. If there is a leak, then action will be taken to treat and also action to rescue.
As for what was suggested, including by Mr Speaker, regarding the study, God willing we will initiate what was proposed just now, so that we conduct a study on the internal, external and comparison of what was just mentioned. Thank you.
7. Mr Chua Tee Yong [Labis] asks the Minister of Foreign Affairs to state how many Malaysians have migrated overseas each month from March 2008 to August 2009 and the overall comparison with the year 2007.
Mr Speaker, I thank the Honourable Member for Labis for the question raised. The total number of Malaysians who migrated overseas for the period March 2008 to August 2009 across the sea was 304,358 people. Meanwhile, for the year 2007, the total number of Malaysians who migrated was 139,696 people. Among the factors of migration are educational factors, economic factors such as working and doing business, and social factors such as following a partner. However, these statistics are only based on the number registered with Malaysian missions abroad. That is all.
Thank you, Deputy Minister, for the answer given. This clearly shows that in terms of migration from 2007 until now, it has increased sharply. Is one of the reasons for migration also due to the problem of political instability that occurred after March 2008? Besides that, in terms of economic and social factors, what steps has the government taken to resolve this problem given that brain drain is happening? This is because most of those who migrate have high knowledge or good financial positions. That is all, thank you.
Thank you, Mr Speaker. Actually, international migration, or international migration, we can see that some are long-term, medium-term and short-term. For the long-term and medium-term, the information I gave is 304,358 people. Actually, Mr Speaker, there are several main factors that show an increase compared with 2008. Actually, if we look at this year, for example, migration to countries such as Australia and the UK has increased very sharply because so many Malaysians want to go out and study in those countries. So, educational opportunities in those countries are one of the pulling factors from there. Besides that, perhaps some follow their partners, perhaps their husband or wife there, then they obtain PR in another country and migrate there. Due to political factors, perhaps I or the ministry consider it a rather small figure, Mr Speaker. So, that is all. That is all.
Thank you, Mr Speaker. Let me continue a little, Mr Speaker. This issue has been discussed for too long, the issue of migration and what was mentioned earlier as brain drain. The Deputy Minister did not mention the profile of the number who left or migrated, 304,358 people, the latest figure for 2008 to 2009. That profile needs to be clarified because we want to know, really. Whatever factors were mentioned earlier, it is certainly multi-factorial, and what the Honourable Member said just now is something that needs to be examined more carefully. The question is, we are not only facing fund outflow today with local investors not wanting to invest here, we are also facing this brain out flow. My supplementary question is, what concrete steps are there to prevent brain out flow from happening as it did recently in November last, Mr Speaker, the state of Penang lost USD3 billion in investment because, among other things, investors did not want to come in because Penang could not provide 1,000 engineers. This is something very important, Mr Speaker, and we are talking about a high-income economy, and our people are migrating in such large numbers. Thank you.
Alright, Honourable Member.
Thank you, Mr Speaker. Actually, out of the 304,000 people who are overseas, about 50,000 are students. If we look, indeed so many have gone out to countries such as Australia, the UK and so on to work there. We cannot deny it. However, if we look at MOSTI, that is the Ministry of Science, Technology and Innovation, and also the Ministry of Human Resources, they have also arranged several programmes to bring people back through the Brain Gain Programme and also programmes to call Malaysians back to Malaysia, Mr Speaker. Regarding investment in the state of Penang as mentioned by the Honourable Member, it is true that investment in Penang has fallen very sharply. I believe this requires skills to bring in investors from foreign countries. So, this is the weakness of that state. We can look at that...
Deputy Minister, Deputy Minister...
...The weakness of the state if compared with...
...Because it was given because of...
...Pelaburan...
...Skill engineers and not because of other matters. Deputy Minister, I want to emphasise...
Its weakness, DAP is the one governing, lah.
...Don't mislead the house. Please.
When we mention engineers or these experts, these all at once include the expertise of the state. We need to look at how it was before and now, and why now so many are migrating to other states or leaving Malaysia. Mr Speaker, that is all. [Question No. 8 – Hon. Dr. Lo' Lo' binti Mohamad Ghazali (Titiwangsa) absent]
9. Datuk Seri Dr. Fong Chan Onn [Alor Gajah] asks the Minister of Health to state that several countries, including China, Australia and the United States, have succeeded in developing and distributing vaccines for H1N1. Does the Ministry carry out research in this country to produce the vaccine itself. If not, when will the Ministry work together with those countries so that Malaysia can obtain this vaccine.
Bismillaahir Rahmaanir Rahim. Thank you, Mr Speaker, thank you to the Honourable Member for Alor Gajah for the question raised. Mr Speaker, to tackle the H1N1 2009 pandemic that is currently occurring, the Influenza AH1N1 vaccine is very much needed. However, producing the vaccine in a short time can only be done by existing vaccine manufacturers. At present, only a few international vaccine manufacturers can produce vaccines in large quantities. Mr Speaker, the Ministry of Health has already worked together with an international vaccine manufacturer, namely GlaxoSmithKline (GSK), which operates in London, to obtain the vaccine. The government has already placed an order to obtain 400,000 doses of H1N1 vaccine at a total price of RM14 million. The first batch of H1N1 vaccine, totalling 46,000 doses, has already arrived in Malaysia in November 2009.
It is expected by the end of 2009 that the total supply of vaccines to be received will be 78,000 doses. Meanwhile, the remaining amount is expected to be obtained in January 2010.
This vaccine will be given to frontline staff who are directly involved in patient management and also national security. It will also be given to high-risk groups, namely diabetes patients, children and pregnant women. The Ministry of Health is aware that vaccines are a key measure for preventing the occurrence of infectious diseases. Therefore, the government has already set up a government-linked company or GLC, with permission, under the Ministry of Finance known as Ninebio. Once it is able to operate smoothly, this company is expected to be able to conduct research and produce vaccines for use in Malaysia and also in the region. Although Malaysia is not yet able to produce vaccines at this time, the Institute for Medical Research has been and is currently conducting research on the genetics of the AH1N1 influenza virus. This research is important for detecting any mutations that occur and can also be used to produce vaccines. Thank you.
Thank you, Mr Speaker. Thank you to the Honourable Deputy Minister for that reply. My question concerns the way the Ministry of Health is handling this H1N1 phenomenon. H1N1 has been around for a long time, and we see other countries, especially countries where at one time H1N1 was very serious, such as Mexico, the United States and also Australia. They now assume this phenomenon is a common health phenomenon. Especially Melbourne, Australia, which at one time was assumed to be the capital of H1N1. When we go to Melbourne we see that they do not mention the matter at all. In the newspapers no one mentions the matter. They assume it is an ordinary matter. Recently Tiger Woods went there to play golf and thousands of people followed him. The restaurants were full, the hotels were all full, and they returned with nothing happening. My question is: is that handling correct or not? When we enter KLIA, we are reminded that everyone is being monitored. Can the Ministry of Health cooperate with the Ministry of Tourism to state that the phenomenon in Malaysia is common, everyone is smart. We invite them to come here, don't worry. If there is any problem, we can handle it. Is this measure better or not? Thank you.
Thank you, Honourable Member, for the question raised. For the Honourable Member's information, in fact the way our country is handling the AH1N1 influenza is among the countries that can be categorised as one of those that manage this influenza in an excellent manner, Honourable Member. This is because, for the Honourable Member's information, up to 22 November 2009, a total of 622,482 cases of AH1N1 influenza have been reported throughout the world, and more than 200 countries are involved, with a death toll of 7,826 deaths. This number is 18 per cent higher than the previous week, and 75,000 cases, or 95 per cent of cases, have been reported in the Eastern Mediterranean region. The figure I mentioned of 18 per cent was reported in the European region, Honourable Member. So this shows a very high upward trend compared with the AH1N1 influenza cases in our own country. That is, in our country, up to 29 November only 12,192 cases have been reported and the death rate remains at 77 persons, that is less than 1 per cent. So, Honourable Member, what I am trying to state here is that our methods and practices, especially those of the Ministry of Health, are the best. Although we show that the trend of cases has declined in our country. However, what is certain is that the AH1N1 influenza is still active throughout the world, especially in the areas I mentioned earlier. So if we adopt an attitude of complacency and do not give reminders or guidance to our society, we will certainly experience problems like those that have occurred in other countries. So, Honourable Member, in terms of cooperation between the Ministry of Health and the Ministry of Tourism, in fact both ministries often hold discussions, and we have also issued advice to foreign tourists.
Although we place emphasis on the measures that need to be taken to deal with this influenza. However, at the same time we also provide some guidance to tourists and state that this country is among the safe countries to visit. Thank you.
Mr Speaker, a supplementary question. Can the Honourable Member explain, in comparison with Singapore, because the vaccine is more widely used in Singapore compared with Malaysia. Also, why did we appoint Ninebio to make this vaccine? Is this firm the most suitable and most capable to do so? Isn't it the case that when Ninebio is making the vaccine two or three years from now, we will have vaccines for H1N2 and H1N3 that have already changed, because of the peculiarity of this virus, as it can change from time to time. Can the Honourable Member state who will be given these 400,000 doses of the vaccine, apart from the 46,000 doses currently given to frontline staff?
Thank you to the Honourable Member for Kepong for the question extended just now. Honourable Member, for your information, why the government, or specifically the Ministry of Health. Ninebio is a GLC company that was set up specifically to conduct research and produce vaccines for use in Malaysia and also in the region. Ninebio is a company which, once it operates, will be able to carry out research on the genetics of the influenza A H1N1 virus and also new viruses. For the Honourable Member's information, research is important. In the effort to produce any vaccine, it is important to identify or detect any form of mutation that occurs. The results of the said influenza and the said mutation can be used to produce vaccines to treat new diseases or influenzas. For the Honourable Member's information also, up to 26 November 2009, a total of 4,333 frontline personnel have been given this H1N1 vaccine injection.
I will provide a breakdown by state if the Honourable Member requires it. However, as I said just now, apart from frontline teams, those who will receive priority in terms of obtaining these viruses are those at high risk, namely diabetes patients, children under the age of five and pregnant women. For the Honourable Member's information also, the administration of the vaccine to pregnant women, the H1N1 vaccine, is safe if we give it to women who are pregnant. So, Honourable Member, in principle, the government has taken measures whereby if the total of 400,000 doses is insufficient, we will be ready to make further orders according to the current situation. Thank you, Honourable Member.
Mr Speaker, a question. The safety of the vaccine was reported yesterday. Canada has its dangers, it was reported.
Honourable Member, I know, Honourable Member. We want to lower the publicity on this H1N1 matter a little, Honourable Member. In fact, I have held many discussions with experts in Malaysia and also in Australia on how we deal with too much publicity for individuals.
This vaccine was reported to be dangerous, yesterday.
Honourable Member, that is no longer necessary.
Malaysian news came out about its dangers in Canada.
10. Tuan Abdullah Sani bin Abdul Hamid [Kuala Langat] asked the Minister of Human Resources to state what is the effectiveness of the amendment to section 30 of the Akta Perusahaan 1967 which limits workers' compensation.
Thank you, Mr Speaker. I will answer the question raised by the Honourable Member, which I have answered several times before. Mr Speaker...
Honourable Member, I remind you that if you have been given an old answer, remember not to change it unless there are new facts, Honourable Member. Otherwise the Honourable Member will fall foul of Standing Order 36(12)... [Laughter]
Yes, Mr Speaker. Amendments to the Akta Perhubungan Perusahaan were made and enforced in February 2008. The amendments were made to improve certain provisions and add several new provisions and schedules, based on the suitability and needs of the current industrial relations environment in this country. One of the provisions involved is Section 30, which relates to awards of the Industrial Court. The amendment made was by inserting subsection 6A, under section 30, providing that in making an award, the Industrial Court is not bound by any request made by any disputing party and may also include in the award any matter that is deemed necessary and appropriate to settle the industrial dispute or a claim for reinstatement under subsection 23. In the Second Schedule of the Act, the Industrial Court, when issuing an award in a claim for reinstatement where back wages are to be paid, must not exceed 24 months of the last wages from the date of dismissal of the worker. In addition, back-wage awards for workers dismissed during the probationary period are also limited to 12 months of the worker's last wages. This practice has already been adopted by the Industrial Court in issuing awards before this through a practice note from 1987. In addition, this amendment has also taken into account fairness and welfare for both parties, namely workers and employers. Furthermore, the payment of back wages has also been practised in other countries, for example in the United Kingdom. Back-wage payments for cases of dismissal amount to six and a half months up to 13 months of wages. For Australia, back-wage payments do not exceed six months as compensation in place of reinstatement of the worker. Overall, the amendment to section 30 is intended to ensure that the process of reinstatement cases is resolved within 24 months from the date the appellant makes a representation until the Industrial Court issues an award. Thank you.
Thank you, Mr Speaker. I listened to the Honourable Minister's explanation regarding the amendment, in comparison with foreign countries such as Australia, Europe and Asian countries. The process under section 30, Mr Speaker, must go through section 20, file, the unfair dismissal section, then subsection 20(3), where the Honourable Minister says it is justified or not justified. If not justified, it goes to the High Court. Back and forth to the Industrial Court, then back to the High Court. An employer who is dissatisfied goes to the Court of Appeal. More dissatisfied, goes to the Federal Court. My question is, are there seven levels that must be gone through to reach the Federal Court? If it takes seven to eight years, this places a burden on the 24-month compensation payment. In Australia, they go direct. We have industrial relations processes that we have to go through. My question to the Honourable Minister is, does taking seven to eight years satisfactorily please the Ministry of Human Resources? Thank you.
Thank you, Honourable Member, and thank you, Mr Speaker. Indeed this matter is not something that pleases us. One of the issues that will be emphasised in the forthcoming Tenth Malaysia Plan is to review the existing processes in the Industrial Relations Act so that we can shorten the time taken, as far as possible, to resolve cases within 24 months. If that can be achieved, the disputes that exist at present regarding this amendment will not arise. Thank you.
Section 30, Honourable Sri Gading.
Assalamualaikum warahmatullahi wabarakaatuh. Happy Eid al-Adha. Minal aidil wal faizin wal makbulin, kullu 'aamin wa antum bikhair. Mr Speaker, a supplementary question. P. Ramlee once said, "trading in people is more profitable than trading in camels." I would like to offer congratulations and thanks to the Honourable Prime Minister for his statement directly freezing foreign workers from Bangladesh. However, I would like to ask the Honourable Minister, the Honourable Minister is one of the dedicated Ministers. What punishment has ever been imposed on agents who mistreat Bangladeshi workers who come to Malaysia but have no jobs, so that they are left stranded without food, without money and so on. What punishment has ever been imposed on wicked agents like these? Thank you, Mr Speaker.
Thank you, Mr Speaker. This indeed goes beyond section 30. Nevertheless, this issue is one handled by the Immigration authorities, where if an agent brings a worker from a foreign country, first, apart from the outsourcing companies that have now been frozen and whose activities have been controlled. Second, there must be a certain specific employer before a foreign worker can be brought into our country. If they bring someone by falsifying documents, and thereby show that there is an employer but ultimately there is no employer, they can be taken action against under the Immigration Act, and this is beyond the jurisdiction of my ministry. Nevertheless, there are cases where there is indeed evidence that this offence has occurred. The Immigration authorities have taken action against them. Thank you.
11. Dato' Shamsul Anuar bin Haji Nasarah [Lenggong] asked the Minister of Youth and Sports to state: (a) what are the latest measures to advance football in the country and is there a proposal for the national football team to be managed by the private sector or government-linked companies; and (b) how much has the government spent on sports activities compared with activities or youth activities in this country.
Thank you, Honourable Member, and thank you, Mr Speaker. Several measures to advance football have been implemented in stages through the cooperation of the Ministry of Youth and Sports, the Ministry of Education Malaysia, the Ministry of Higher Education and the Football Association of Malaysia (FAM). The Ministry of Education Malaysia, which plays a major role in providing grassroots football players, has already established the Education Minister's Cup Football League and the KPM-FAM Cup Football League, which aim to form national under-14 and under-17 teams, in addition to the continuing role of the Malaysian School Sports Council in organising the national under-12 football competition.
For the Honourable Member's information, the Football Association of Malaysia is also currently making efforts to place some young national players to play in leagues overseas, particularly in Indonesia. This is because the Indonesian Football Association has allowed every team in the Indonesian league to register three players from ASEAN countries, and these players are not categorised as foreign players. Therefore, this opportunity is hoped to be fully utilised by national football players to gain experience of Indonesian football style and have the opportunity to play in front of hundreds of supporters in that country. Besides that, FAM also encourages other bodies, especially the private sector, to hold football player development programmes such as the TV3-produced Soccer Kids programme or to set up private football academies such as the Arsenal, Brazil and Chelsea football academies. For the Honourable Member's information, the approach taken by the government is to strengthen and further reinforce cooperation in the planning and implementation of programmes carried out by FAM. An cooperation agreement between the National Sports Council and the Football Association of Malaysia was also signed to place the management of the Harimau Muda team, namely the under-19 team, under the National Sports Council of Malaysia on 24 March 2009. The ministry also always supports the Football Association of Malaysia in attracting the interest of the private sector and also government-linked companies to contribute funds in efforts to develop the national football programme as a whole. For the answer to part (b), for the Honourable Member's information, for sports activities, including high-performance sports in 2008, the ministry allocated RM88.72 million, while allocations for youth development amounted to RM79.272 million throughout 2008. Thank you.
Thank you, Mr Speaker. Many of the measures mentioned by the Deputy Minister regarding the development of national football have indeed been carried out, but it seems they have not yet been achieved and successful as the hopes of the people and football fans as a whole. The ministry must really do it in a more organised manner. I want to push that matter further, but I want to focus on the development of youth. Does the ministry have any intention to modify the various programmes and activities, whether Rakan Muda or any other programme, to meet the interests and tastes of the young generation, which has changed, is no longer the same and is increasingly different. Then, I would also like to ask for comments from the ministry. We have Yo!, for example, a supplement from Utusan Malaysia. In the past all of it was youth stories, but today it has also included sports stories for the young generation. Moreover, in daily newspapers too, there is a lot of sports news rather than youth news. My question is, what percentage of focus does the ministry give, whether in the work of the Minister, the work of the Deputy Minister, or the work of officers, to youth development compared with sports development? In line with what the ministry says, the Ministry of Youth and Sports, youth is placed first. I ask the Minister for comment.
Thank you, Honourable Member. The Ministry of Youth and Sports (KBS) has always adopted an open attitude, reaches out to youth and also listens to the voice of youth. So, in my view, whether it is the programmes provided or planned by the ministry, whether it is Rakan Muda, KBS always looks at, studies and takes care of the needs and also the tastes of youth. For that reason, the Ministry of Youth and Sports always reviews these existing programmes from time to time to suit those needs.
As for the percentage of time and energy devoted to the activities that KBS focuses on, in truth KBS focuses fully on all of these, including youth and sports, because both elements are important for the development of the nation's youth. If the Honourable Member takes note, sports programmes, including Sports for All, are also one of the programmes that have been introduced very widely to all the people in our country. In my view, this is also an effort of the ministry. Apart from sports, the ministry strengthens the needs of our youth so that all or both of what I have said can benefit our youth in this country. Thank you.
Thank you. I would like to ask the Honourable Deputy Minister. Promoting football is certainly not an easy matter. We all know, Mr Speaker, that football players, football coaches, state football teams and state football associations are all facing financial problems. Recently I was informed that every state team or club wishing to take part in the Piala Malaysia must deposit as much as RM2.5 million, failing which they cannot take part in any cup competition, including the Piala Malaysia in future. The Kelantan team, Mr Speaker, the Kelantan Warriors, who have succeeded in reaching the final this time. The Honourable Member for Sri Gading, Johor, apparently does not know how to play football. At present they are facing difficulties in obtaining the deposit, and even asked the Kelantan State Government to write a letter as a guarantee, and the Kelantan Government reportedly refused to issue the guarantee letter to enable the KAFA Kelantan team to take part in the Piala FA. So, how can the Ministry of Youth and Sports help and look into this problem that can hamper the progress of football in our country? Besides that, my second question is, does the ministry intend to intervene by introducing a condition, namely that every football team competing in the Piala Malaysia must come from the sons of its own state. It can no longer be imported from abroad, that is indeed not the case, but it also cannot be from one state to another. It must be from among the people of the state concerned. I believe that in this way, it will further boost support for the state teams that compete. Thank you, that is all.
Thank you, Honourable Member. I have noted the Honourable Member's concern. For the Honourable Member's information, in football, FAM is a national sports association and the ministry can only hold discussions, but cannot intervene in the affairs of FAM. In fact, FAM itself obtains sponsorship or resources from private companies or GLCs. For example, FAM receives sponsorship from Telekom Malaysia of RM9.3 million every year, RTM RM6 million, Genting Berhad RM800 thousand, Sime Darby RM500 thousand, 100Plus RM200 thousand. Meanwhile the ministry also gives assistance to them of RM300 thousand.
Honourable Member, if they already receive all kinds of sponsorship, surely the ministry cannot interfere in FAM. What is the job of the Ministry of Youth and Sports?
I have already said that we can give advice or hold discussions. If we intervene in the affairs of FAM, what we must bear in mind is that FIFA is a system in which, if the government intervenes, it will become an issue to the point that it can be suspended. This is something that will happen. So, I indeed agree with the Honourable Member, the government will look for a way to discuss and find an appropriate method to overcome the problem raised by the Honourable Member just now. Thank you. [Question No. 12 – YB. Tuan Mohd. Yusmadi bin Mohd. Yusoff (Balik Pulau) was absent] [Question No. 13 – YB. Datuk Sapawi bin Haji Ahmad (Sipitang) was absent]
14. Tuan Azan Ismail [Indera Mahkota] asks the Minister of Youth and Sports to state what is the rationale for setting a target of one gold medal at the upcoming Olympic Games in London with an allocated cost of RM16 million, and what form of preparation has been made and which fields may be the main hope.
Thank you, Mr Speaker, and thank you, Honourable Member. For the Honourable Member's information, the Ministry of Youth and Sports has launched the Route to London 2012 Programme, which is a specific programme for preparing athletes towards the London 2012 Olympic Games. In fact, four sports that have the potential to win medals, namely badminton, cycling, archery and diving, have been selected to take part in this programme with a total cost of RM16 million for a period of four years, from 2009 to 2012. The estimated cost covers athletes' training allowances, training equipment, training locally and abroad, as well as expenses for competitions locally and overseas. Through this programme, athletes will also take part more frequently in international-level competitions so that they can identify their strengths and weaknesses compared with athletes of other countries, such as at the Asian and world championships. The rationale for setting the target of one gold medal is based on the recent performance and achievements of several athletes who have the potential to win the country's first gold medal at the London 2012 Olympic Games, especially our national badminton athlete, Datuk Lee Chong Wei, who won the silver medal at the Beijing 2008 Olympic Games and currently maintains the number one world ranking, as well as the recent achievements of cycling at the world level, particularly Mohd. Azizul Hasni Awang, who was crowned overall champion of the World Cup in the 2008 and 2009 editions. Thank you.
Thank you, Mr Speaker. I too hope that at least several of our sports can be present or contested at the 2012 Olympics. My supplementary question is, if we look back, there was a time when our football achievements also entered the competition level at the Olympic level, that was a history of the past. I would like to ask the Honourable Deputy Minister, is the target of setting an award of RM1 million per medal the basic measure for such achievement. What if, for fields that we never expected or dreamt of winning a medal, will the same reward also be allocated to them? Thank you.
Thank you, Honourable Member. In fact, to receive RM1 million when winning or obtaining first place or the championship, this has been approved by the Cabinet Committee on Sports, where the Olympic Games is the only international sport in the world and this is the only incentive. We hope that with this incentive or RM1 million, it can encourage especially our national athletes to achieve even more what has been determined by the ministry. Apart from receiving RM1 million, in fact those who obtain the championship or the RM1 million will also receive a monthly reward of RM5,000 as a welfare benefit for athletes who have succeeded in bringing honour to our country. Thank you. [Question No. 15 – YB. Datuk Nur Jazlan bin Tan Sri Mohamed (Pulai) was absent] [Question No. 16 – YB. Puan Teresa Kok Suh Sim (Seputeh) was absent]
17. Datuk Hajah Norah binti Abd. Rahman [Tanjong Manis] asks the Minister of Health to state: (a) whether the ministry intends to eradicate malnutrition in the Tanjong Manis area, which is very significant; and
(b) whether the ministry is aware that this situation has existed for a long time.
Thank you, Mr Speaker, and thank you to the Honourable Member for Tanjong Manis for the question raised. Mr Speaker, the Ministry of Health has always taken seriously the incidence of malnutrition, or KZM, in the Tanjong Manis area of the Mukah division. Data collected by the Ministry of Health through the Health Informatics Centre in 2008 found that 14.8 per cent of children under the age of 5 in the Mukah division, Sarawak, suffer from malnutrition, namely being underweight. In 2007, as many as 17 per cent or 29 children in the Tanjong Manis area suffered from being underweight and this has decreased to 7 per cent, namely 13 children, in September 2009. Children who suffer from being underweight are given treatment as needed, including routine health care such as immunisation, deworming, treatment for illnesses, nutrition and health counselling and home visits. Underweight cases are a priority at health clinics, where children who suffer from being underweight must come to the clinic every month until they recover. In addition, these children are also given assistance with full cream milk powder and multivitamins as needed. For children from the hardcore poor families, they are given basic food assistance including rice, anchovies, cooking oil, biscuits, full cream milk powder and multivitamins every month through the Malnourished Children Rehabilitation Programme. Honourable Member, the ministry is very much aware and always strives to overcome the problem of malnutrition. However, the causes of malnutrition are varied, including socio-economic and cultural factors. Therefore, cooperation from other agencies is needed, especially in improving the socio-economic status and human capacity of the community in this area. Thank you.
Thank you, Mr Speaker, and thank you, Honourable Deputy Minister. I do not agree with the data given by the Deputy Minister. Sorry, not for any other reason, but firstly, when the Ministry of Health goes to the field, it does not go to the whole Tanjong Manis area. Mostly, I understand the challenge is quite difficult to reach Tanjong Manis. For ordinary people, if they want to go out using the express boat, the fare is more than RM1,800, which is quite expensive, and I understand that. For government officers to go to the field, if their allowance is only RM250, they certainly will not go. So, to say this fact is 14 per cent, I think it is 40 per cent, Deputy Minister. So this is quite significant and I have discussed this matter many times...
Honourable Member, the time is short, yes.
...with the Chief Minister of Sarawak and he is very worried. So we want to know, what is the long-term programme and will the ministry go down fully and look into this problem. In terms of not only malnutrition but also worms, worms in the eyes because the water is quite dirty. So we request the ministry to answer.
Thank you to the Honourable Member for Tanjong Manis. If the Honourable Member does not agree with the statement that has been given, I also do not agree with the question raised by the Honourable Member.
Because the fact, whether the ministry or the health personnel did not go down, is not true, Honourable Member. This is because, according to our data in Tanjong Manis, we have four health clinics and we have data where the number of child attendances from 2007 until 2009, the total recorded, was 48 persons identified who are under five years old and who received assistance, and those under five years old have severe KBB problems, namely 11 persons in 2007 and decreasing to three persons in September 2009. At the Rejang Health Clinic, the number of attendances or children receiving assistance from 28 persons in 2007 increased to 63 persons in 2009. Likewise at KK Tanjung Manis, or Tanjung Manis Health Clinic, 57 persons were recorded in 2007 and 54 persons in 2009. KK Paloh, 41 persons in 2007 and in 2009 recorded 25 persons. Overall, Honourable Member, the children who have benefited from food assistance, namely children under five years old in terms of weight-for-age from 2007 until September 2009, were 174 in 2007, 219 in 2008 and 183 in 2009. So the fact regarding whether the health personnel at these health clinics did not go down, Honourable Member, is not true, but I do not deny that an integrated effort needs to be implemented. Of course, Honourable Member, as the Member of Parliament for Tanjung Manis, we also welcome that we can implement an integrated plan to help the community, especially children under five years old, so that they receive proper food assistance. For the Honourable Member's information too, the Malnourished Children Rehabilitation Programme was established since June 1989, in line with the government's efforts to eradicate poverty among the poorest groups. Initially this programme was an immediate strategy to enable 12,000 children who had been identified as suffering from malnutrition through the National Nutrition Surveillance System, or SPKK. An allocation of RM12 million was approved at that time to enable about 12,000 children who had been identified as suffering from malnutrition in severe and also moderate conditions. This allocation, Honourable Member, was improved by RM6.8 million in 2007, and an additional allocation under the new 2008 policy of RM3.5 million was obtained starting from 2008 to cover...
Honourable Member, please summarise, Honourable Member.
...the increase in food prices and the rise in the poverty line. Efforts to improve the situation from time to time are also taken by the Ministry of Health to tackle this malnutrition problem. Thank you, Mr Speaker.
Thank you, Honourable Member. If there are other matters, Honourable Member for Tanjung Manis, please resolve them outside, Honourable Member. It is now 11.34 am, Honourable Member... [House in uproar]. Honourable Members, the oral question session has ended for this morning. I am informed that the Honourable Minister in the Prime Minister's Department has a motion. [Time for Questions for Oral Answer has ended]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, I beg to propose: "That, pursuant to Standing Order 12(1), the sitting of the House today shall not be adjourned until 10.30 pm tonight and after that the sitting shall be adjourned until 10 am, Tuesday, 1 December 2009".
Mr Speaker, I beg to second.
Honourable Members, I now put the question to the House for decision. The question is that the motion as just moved be agreed to. The motion was put and agreed to.
Bill — Supply Bill 2010 and Development Estimates Motion 2010 CommitteeBill
The Order of the Day was read to resume consideration of the "Supply Bill 2010 and Development Estimates 2010 in the Committee of the Whole House." [Eighth Day] The House resolved into Committee. [Deputy Speaker (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar) chaired the Committee]
Bill — Supply Bill 2010 and Development Estimates Motion 2010 Committee — Head B.25 [Schedule] – Head P.25 [Development Estimates 2010] –Bill
Head of Supply B.25 and Head of Development P.25 under the Ministry of Domestic Trade, Co-operatives and Consumerism, the Minister is asked to continue the reply.
Thank you, Mr Chairman. Before the sitting was adjourned last week, I had already answered the question raised by the Honourable Member for Kuala Krau regarding the shares of Bank Rakyat. Allow me to continue with my answers. Only, to Honourable Members I would like to inform that the answers I will give are based on the issues raised and not in the order of the speeches of the Honourable Members.
Accordingly, if there is anything not yet mentioned, perhaps it may be mentioned at a later stage, according to the issues raised. Several Honourable Members spoke and mentioned matters on cooperatives. The Honourable Members for Pasir Mas, Batang Sadong, Arau, Teluk Intan, Kuala Krau and Hulu Langat. All of them raised several issues on problems of cooperatives and so on. The Honourable Member for Batang Sadong, for example, wanted to know the number of cooperatives throughout Malaysia and also in Sarawak. For the Honourable Member's information, a total of 7,076 cooperatives have been established in Malaysia as of 18 November 2009, with a total membership of 6.65 million people, with a total of shares or fees of RM8.9 billion, total assets of RM1.2 billion and total turnover of RM6.19 billion. As for the position of cooperatives in Sarawak, the situation is as follows: the number of cooperatives is 538, total membership 415,100, total shares or fees RM115.7 million, total assets RM266.1 million and total turnover RM49 million. The Honourable Member for Kuala Krau, the Honourable Member for Hulu Langat and the Honourable Member for Batang Sadong also raised the matter of the performance of Koperasi Bela Rakyat (KOBERA). For the information of the House, the current position of KOBERA is as follows: KOBERA that has been registered is 168 out of the total of 576 State Legislative Assembly seats throughout the country, and at the establishment stage 362.
In reply to the Honourable Kuala Krau, who wished to know the total number of KOBERA in Pahang. I wish to inform the House that three KOBERA have already been registered in Pahang, and in their establishment there are 18 in total. The Honourable Batang Sadong also wished to know about the performance of KOBERA in Sarawak. I wish to inform the House that, so far, 12 KOBERA have been established and have been registered, with 27 in the process of being established.
Honourable Minister, may I ask for an explanation?
Ya.
Thank you, Honourable Minister. I can see that some of the cooperatives in our country are far too small. Is there any effort by the Ministry to merge these cooperatives so that they become one larger cooperative, with greater paid-up capital, and their businesses will also earn greater profits? I would also like to request an explanation from the Honourable Minister. When a cooperative is profitable, when its profits are large, is it the Ministry's policy to limit the dividends given to shareholders? What is wrong with giving freedom, if the cooperative is active, earns large profits, and the dividends are left to the cooperative to give to its shareholders without limit, as long as they make a profit? Thank you.
Thank you. Actually, I was going to come to that matter. However, since it has been raised, I will answer it. Several Honourable Members, including the Honourable Member for Pasir Mas and the Honourable Arau, for example, raised the need for cooperatives to be merged and so on. As we know, the number of cooperatives is large. Accordingly, the networks created by cooperatives are also very large. We see that cooperatives have a bright future. However, because their businesses are small-scale and they compete among themselves, in the end they are unable to grow and so on.
That is why, on the part of SKM and the Ministry, we have set a clearer direction so that cooperatives can be moved from being entities for the social welfare of members to becoming larger business entities, becoming more successful business entities. Today, although there are 7,000 cooperatives, for example, only around 3 per cent are large-scale cooperatives with turnover exceeding RM5 million a year. The rest are small-scale cooperatives whose turnover is RM250,000 a year. So, aware of these matters, SKM has finally undertaken several ways to develop these cooperatives. Among them is what was mentioned by the Honourable Jempol, and likewise by the Honourable Pasir Mas and the Honourable Arau, who proposed that these cooperatives be merged to become large-scale cooperatives. I wish to inform the House that this matter is being acted upon by the Ministry and SKM. For example, we will begin with discussions on merging credit cooperatives. At present there are more than 500 credit cooperatives carrying on their credit businesses by providing loans to members and so on. So, at the initial stage, I wish to inform the House that on 8 December 2009, we will gather these credit cooperatives to discuss whether it is possible to form a merger among these credit cooperatives, with the ultimate aim of the Ministry being to establish more cooperative banks. Today there are two cooperative banks, namely Bank Rakyat and Bank Persatuan. We propose that with the creation of this merger of credit cooperatives, we may be able to establish one or even two more banks. Likewise with cooperatives carrying on retail businesses and so on. I agree with the view of the Honourable Pasir Mas, for example, who proposed that retail cooperatives be established so that we can make them large cooperatives to set up supermarkets and so on.
Thank you, Mr Chairman. This concerns establishing more cooperative banks. Does the Honourable Minister recall that we once had a bank, the Central Co-operative Bank, Bank Pusat Kerjasama Koperasi? However, because of discriminatory government policies and practices, this cooperative bank can be said to have gone bankrupt, because the government had a policy of giving leniency on loans of money from that cooperative, where the money was given to UMNO Division Chiefs. Most of them did not repay. Therefore, it went bankrupt. What will the government do so that these matters do not happen? We will help the shareholders in CCB to be repaid that money, and such things will not happen again.
The Honourable Ipoh Barat is familiar with such baseless accusations. So I do not need to answer, because that is the habit of the Honourable Ipoh Barat.
[Menyampuk]
I wish to say. Wait, Honourable Member. I wish to say that the matter of government interference and so on does not, I think, arise. The matter of giving to UMNO and so on does not arise. Bank Rakyat, I would like to give an example, is a cooperative bank established from the merger of eleven small credit cooperatives at that time. Today, Bank Rakyat is a bank that has made a name for itself and is the largest Islamic banking institution in our country. Bank Rakyat's income this year is higher than that of other commercial banks. This shows that a cooperative bank can also progress if it is managed well.
As for other banks, I think many other finance companies that were not managed well eventually died off. That is a normal occurrence in the business field, and one cannot blame the government and so on for being involved in bankrupting those cooperative banks. I think that is an ill-founded assumption. So, I apologise, Honourable Ipoh Barat. Find more rational facts for me to answer.
[Bangun]
I want to move on to... Yes.
Thank you to Mr Chairman. Thank you and to the Honourable Minister. I would like to seek some views from the Ministry regarding the appointment of Board of Directors members in all cooperatives in our country. To what extent is monitoring carried out to ensure that the appointment of Board of Directors members or ALP consists of those who truly have business vision and comply with the law, and what action has the government taken so far against Board of Directors members who misconduct themselves? So, if my friend from Ipoh Barat says that the UMNO Division Chief, whoever it is, as a human being sometimes holds this financial position and sometimes forgets himself. It is not only the UMNO Division Chief; the PKR Division Chief is the same. This is a human issue. It is not about this. So, what is the Honourable Minister's view on the control carried out by the government over Board of Directors members who deviate from their duties, responsibilities and trust given by cooperative members?
[Bangun]
But a slightly different issue. Regarding cooperatives. Will the Honourable Minister answer first or...
Ya.
[Laughter] Thank you, Mr Chairman. I want to raise the matter of the reason the Honourable Minister mentioned earlier, the fairly large volume of transactions generated by cooperatives. If only 6.6 million cooperative members across the whole country can generate up to RM6.19 billion in turnover for a year, that is relatively quite small compared with the total value of shares offered, RM8.9 billion. That is a very large amount of shares.
I would like to ask perhaps for the Honourable Minister's view, because it has been raised many times among the countries of the world, in the Scandinavian countries, cooperatives are the largest economic engine for empowering the economy in those countries. They generate more than 30 per cent of GDP in those countries. Compared with us, various incentives are given, and this year we know the government has proposed a new package on tax treatment for cooperatives. Is there any particular strategic plan the Ministry proposes to bring in to uplift the position of these cooperatives? Considering the number of members involved is so large, and the total of shares is, I think, among the highest in the in-house issues issued in our country, RM18.9 billion. Is there a particular plan to be undertaken, dedicated to uplifting these cooperatives to a higher value or much higher than their present position? Thank you.
Thank you, Honourable Arau. Indeed, in terms of the board of directors and so on, after being appointed to the Board of Directors, they are required to attend administrative courses, financial administration courses and so on, to ensure they are truly capable of carrying out their duties as Board of Directors members and so on. Such courses are usually organised by the Malaysian Cooperative College (MKM) and also by ANGKASA itself.
In terms of action, indeed many actions have been taken against Board of Directors members who misconduct themselves, including cooperatives that misconduct themselves. As I have answered several times in this House, there are actions such as suspension, the suspension of cooperatives, and the action of dissolving cooperatives. As for the Board of Directors, for example, the action of dismissing Board of Directors members is always taken when we detect misconduct and so on. So, there is no problem in terms of Board of Directors members who misconduct themselves and are not subject to action. We constantly monitor this matter. Regarding the Honourable Indera Mahkota, I agree that there are many things we can do with these cooperatives. Their number is very large and their members are very numerous, but why is their contribution to national income so small? I would like to inform the Honourable Indera Mahkota that, at present, the contribution of cooperatives to the national GDP is very small, at only 1 per cent. We are targeting 2012 or 2013, when the contribution will be 4 per cent. So, several things will be done to uplift the dignity of these cooperatives. As I mentioned earlier, merging small cooperatives into larger cooperatives so that they are able to compete with larger companies. Likewise with the Mentor Mentee Programme, where large cooperatives can help small cooperatives. The Ministry also helps to establish business matching, or a business matching chain, between cooperatives and cooperatives. Likewise, the Ministry will help to establish a value chain, because, as we know, the activities of cooperatives are diverse. So, we can establish a value chain among these cooperatives that is suitable according to their business activities. Likewise with the system, we will establish a vendor system that will produce more franchisees and franchisors among cooperatives. For example, one major franchise that we are currently establishing is through Ar-Rahnu X'Change under Bank Rakyat, where SKM and Bank Rakyat allocate capital funds, and likewise PNS will allocate capital funds of RM20 million to help establish Ar-Rahnu X'Change among these cooperatives. So, I wish to inform the House that indeed there is a target of SKM...
Honourable Minister.
To create larger and viable cooperatives to help increase the national income. I would like to refer to...
Honourable Sekijang, Honourable Member.
Honourable Sekijang?
Yes, thank you, Mr Chairman, and thank you, Honourable Minister. I was interested in what the Honourable Minister said earlier regarding these Board of Directors members who were dismissed. So, I would like to know what the effect is on cooperatives when a Board of Directors member or manager is dismissed within the near future? Sometimes we find that the same person also joins another cooperative and becomes a member of another board of directors. So, is there any monitoring carried out by the Ministry of those who are involved in this dismissal? Thank you.
Honourable Member, we will monitor that matter. Any board member who is subject to action, dismissed and so on because of misconduct in financial irregularities, we will try to ensure that they do not become members of the board of another cooperative. We will constantly monitor this matter. I would like to answer the question raised by the Honourable Hulu Langat regarding the repayment performance of the SKM Revolving Capital Fund Loan. I would like to inform the House that the Revolving Capital Fund is a special fund established by the government to help cooperatives.
This is the government's social responsibility towards cooperatives, because under normal circumstances, cooperatives would not receive financing facilities from banks or financial institutions. I would like to inform the House that the total loans issued up to today amount to RM334.1 million, and the repayments received by cooperatives up to now amount to RM100.5 million. The Honourable Hulu Langat also raised the current status of the University Cooperative Federation Berhad, or GAKUB. GAKUB was established to help university cooperatives supply essential goods in universities in bulk, with the hope of obtaining supplies at better prices. However, this effort did not succeed. At present, the position of GAKUB is weak and no business activities are being carried out. Mr Chairman, the Honourable Hulu Langat also raised the issue of 'One District One Industry'. I would like to inform the House that SDSI, that is 'One District One Industry', is a national programme spearheaded by the Implementation Coordination Unit (ICU) in the Prime Minister's Department. Cooperatives are included in this programme and under cooperatives, it is named One Region One Industry, or SAWARI. Up to now, SKM has produced 20 district-level cooperatives producing various products. For example, the production of belacan through a cooperative in Papar, Sabah; the production of snacks or keropok through a cooperative in Pasar Parit Raja, Batu Pahat; traditional kuih through cooperatives in Melaka and Negeri Sembilan; batik in Kelantan and so on. The Honourable Batang Sadong wished to know about the categories of successful and outstanding cooperatives that can be emulated. The most successful category of cooperatives is Credit and Banking Cooperatives. As much as 68 per cent of business value is generated by cooperatives in this category. The second largest category is Consumer Cooperatives. As many as 3,447 cooperatives are involved in this field.
In the index of the 100 largest cooperatives evaluated, most of them consist of credit banking cooperatives and also plantation cooperatives. The Honourable Arau asked what steps have been taken by SKM to overcome the problem of misconduct by ANGKASA. The ANGKASA issue arose because of allegations of misconduct by the former Chairman of ANGKASA, namely Royal Professor Ungku Aziz, as a result of their internal turmoil. SKM had carried out an investigation into ANGKASA in April 2008 and found that no cases of financial misconduct had occurred. SKM's findings are as follows: (i) the removal of the Chairman of ANGKASA was not in line with the by-laws; (ii) expenditure for the meetings held was too high and this matter has also been reported to the police for investigation. To resolve the internal issue, namely the issue of by-laws and so on, SKM has taken action by directing ANGKASA to hold an annual general meeting under SKM's supervision on 10 January 2009, in line with the requirements of their by-laws. The Honourable Arau wished to know the extent of SKM's role in strengthening cooperatives. In this regard, SKM implements two strengthening programmes, namely strengthening cooperative governance through the programme of inspection, enforcement, and advisory and guidance services. Secondly, opening business opportunities and business expansion. I have already answered this matter when answering the question from the Honourable Indera Mahkota earlier, namely the programmes on how to uplift these cooperatives...
[Bangun]
Honourable Telok Intan, Honourable Arau.
Thank you, Mr Chairman, and thank you, Honourable Minister. I am satisfied with the answer on ANGKASA, that there was no misconduct. Only we would like to know here, most small cooperatives or cooperatives involving government staff and so on are mostly led by those who have already entered retirement. This means that in terms of innovation and competitiveness, they can be said to be already weak or no longer able to create a situation in which they can adapt to the new environment of the innovation economy that we are going through now. So, to ensure that these Board of Directors members receive guidance, direction and governance as the Honourable Minister raised earlier, we need advisory officers and cooperative officers, whether at state and district level and so on, who are assigned or placed with those who have knowledge of this governance, including not only obtaining courses within the country, we should also send them for exposure overseas, such as to countries that are advanced in cooperatives like the Netherlands, where a large part of its GDP is dominated by cooperatives. So, what action will the government take to ensure this matter can run smoothly so that we ensure these small cooperatives do not become merely enjoyable participation? Participation that is not serious to them, so that we feel our participation gains a good importance in our country.
Thank you, Honourable Arau. Regarding exposure and so on, apart from what I mentioned earlier, I agree that we can provide more exposure to them, especially overseas and so on. Indeed, on the part of the Malaysian Cooperative Commission (SKM), not only SKM but also through ANGKASA and so on, many overseas visits have been carried out to expose these cooperative members or cooperative leaders so that they can understand and also learn from large cooperatives abroad. However, as we know, overseas visits usually involve large sums of money and so on. Sometimes these are the constraints faced by those cooperatives. Regarding the involvement of cooperatives, such as the smaller cooperatives that are more serious about business and so on, I have also mentioned earlier that large cooperatives have been directed to help small cooperatives in carrying out their businesses, and I understand that when a cooperative is small, obtaining the best possible management may be rather difficult because of capital and so on. So that is why we are strengthening the mentor-mentee programme, so that large cooperatives can guide small cooperatives that do not have the financial capacity and so on.
[Bangun]
Koperasi?
Sila.
Thank you, Mr Chairman. In connection with the reply of the Honourable Minister just now, and following the question of the Honourable Arau, I have observed that there are cooperatives that were once giants, MOCCIS for example, giants, in which government officers bought shares, but which are led by people who have been there far too long. Moreover, they have retired for a very long time. Eventually the performance of MOCCIS got worse and worse, and it is observed that it is not only these people; the board of directors is occupied by former senior officers, so that whenever there is no attendance at meetings, the same people are still on the board. Does the level of the Minister, the commission, or the Minister have the power to advise this board, even though they have been re-elected, but because they have been there for so long, they stay on and others too do not dare to disturb these old people because they are the KSU, the KSN and so on?
As a result, investment in this cooperative is getting smaller, and I am told there is a MOCCIS that... the Honourable Member also knows the fate of MOCCIS now. So, my question is about the role of the power of the Minister and also this commission to enter and advise cooperatives like this, which were once giants but eventually have shrunk. Thank you, Mr Chairman.
Honourable Member, in matters of cooperatives, the freedom of members to decide their leadership is given greater priority. If we look at ANGKASA itself, it once faced the same issue, namely being led by a Yang di-Pertua ANGKASA for a very long time, until eventually the members made a decision to change that leadership. So, on the part of SKM, perhaps, I am also not clear about this matter, but I think that as an advisor, perhaps we can do so, but to force the board of directors to be changed and so on, I think that would already be interfering in matters permitted by law for each cooperative. However, I agree with the view of the Honourable Member that sometimes when someone has been there for too long, ideas become too stale. He has run out of ideas. So, we will give attention to this matter, and I will ask SKM to list how many cooperatives have been led by a board member for a very long time, exceeding five or ten years and so on. Insya-Allah, I will look into this matter. The Honourable Member for Telok Intan asked about the Bandar Raya Cooperative, which does not pay dividends. For the information of the Honourable Member, dividends are only paid if the cooperative makes a profit. However, according to the latest audited Financial Statement of Koperasi Pekerja Bandar Raya Berhad, as at 30 June 2008, this cooperative suffered a loss of RM166,936, and the loss in 2007 also amounted to RM2687. Since there was no profit, there were no dividends. Several Honourable Members asked about the Malaysian Cooperative College (MKM). To answer the question from the Honourable Member for Hulu Langat regarding the number of diploma-level graduates produced by the Malaysian Cooperative College, or MKM. I am pleased to inform that up to April 2009, MKM has produced 345 graduates of the Diploma in Cooperative Management, which has been recognised by the Malaysian Qualifications Agency (MQA) since 2000.
The Diploma in Cooperative Management programme was started in 1991 with a three-year diploma programme, and the tuition fee charged is RM4,500 for cooperative members and RM5,500 for non-cooperative members. The number of students between June 2007 and 2010 is 34, from 2008 to 2011 is 83, and from 2009 to 2010 is 140. So the total is 527. I would like to move on to another issue, namely the issue of the Companies Commission of Malaysia (SSM). The Honourable Member for Kuala Krau asked about the role of SSM in disseminating information to help local entrepreneurs. I would like to inform that SSM offers mobile counter programmes, circuit counter programmes, cooperation with business associations, holding dialogues, talks and so on, providing information online, carrying out promotional activities through print and electronic media, and holding training programmes for local entrepreneurs. Mr Chairman, many Honourable Members raised issues involving hypermarkets. Among them were the Honourable Member from Parit Sulong, the Honourable Member from Pasir Salak, the Honourable Member from Sungai Petani, and also the Honourable Member from Kepong. To the Honourable Member for Parit Sulong and the Honourable Member for Pasir Salak, I would like to explain the role of the ministry in helping bumiputera IKS expand the marketing of their goods in foreign hypermarkets in the country. For the information of Honourable Members, so far, on average, about 7 per cent of the products found in foreign hypermarkets in our country are bumiputera IKS products.
The hypermarkets I am referring to are Giant, Carrefour, Tesco and Jusco. Although the number is small, namely 7 per cent, the total in terms of SKU - Store Keeping Unit is significant. IKS products that have been listed permanently in these four hypermarkets and foreign supermarkets reach 10,000 SKUs. So, although in terms of percentage it is only 7 per cent, that is 7 per cent of a very large total. Therefore, in terms of the number of SKUs, it reaches the level of 10,000 SKUs. Those are bumiputera IKS products, but if we look at local products, including bumiputera and non-bumiputera products sold in hypermarkets, it reaches 80 per cent. Within that 80 per cent is included the 7 per cent of bumiputera IKS, so for local products or Malaysian products, it is 80 per cent. The ministry is of the view that the suggestion of the Honourable Member for Pasir Salak that the ministry ask enforcement officers to monitor the supply of bumiputera IKS products in hypermarkets and supermarkets is a very good proposal, and the ministry will direct price monitoring officers to monitor not only prices but also supply, the quantity of IKS products, and the position of bumiputera IKS products in these foreign and local supermarkets. The ministry has established strategic cooperation with hypermarkets and supermarkets to help market bumiputera IKS products. These foreign hypermarkets are bound by the guidelines on foreign participation in distributive trade in Malaysia of 2004. Under these guidelines, foreign hypermarkets and supermarkets are in fact required to achieve 30 per cent permanent display of bumiputera IKS products compared with the total of all products. This achievement has indeed not yet been reached, and we admit it, but the increase is happening little by little. Therefore, the ministry is very serious about monitoring this achievement, and several discussions have already been held between bumiputera IKS representatives and these foreign hypermarkets.
Minta Penjelasan.
Oh!
Thank you, Mr Chairman. Honourable Member, I am saddened to see that our IKS have to market their products through farmers' markets, at stalls, on five-foot ways, whereas we are in a shift towards strengthening these bumiputera entrepreneurs to a level where they become commercial. So, by when, I wonder, can the ministry ensure that the results of IKS products can be marketed in hypermarkets, not only in our country but also abroad through agencies under the ministry and so on, and no longer depend on farmers' markets, under the umbrella of farmers' markets, at stalls, and on five-foot ways, because I have received complaints that they cannot expand their efforts because there is no proper marketing managed by the government. What are the next steps?
Thank you, Honourable Member. In fact, the marketing of IKS, which is entrusted to the Ministry of Domestic Trade, Cooperatives and Consumerism, is only for listing in hypermarkets. The rest falls under the jurisdiction and responsibility of MITI - Ministry of International Trade and Industry. On behalf of the ministry, we take responsibility for marketing these IKS products in hypermarkets. So, for that, the initial stage is to identify the problems faced by bumiputera IKS in marketing in these hypermarkets. Several issues raised by bumiputera IKS, for example in terms of payment, credit term, which for a long time has been imposed by hypermarkets on bumiputera, up to 60 days, 90 days, and 120 days. For that reason, I said just now that at this initial stage, I myself have chaired several meetings to bring together IKS entrepreneurs and hypermarket representatives. First, we resolve the problem of credit term, with your permission, which has been there for a long time, and today the side..., no problem, I will give way. I will give both of them. I remember. Honourable Member for Indera Mahkota and also the Honourable Member for Putatan.
I have finished answering, I will call you. For example, we resolve the credit term, it was agreed that it is no longer 90 days but 30 days. That is the first. Second, there are too many hidden fees, or hidden charges, with your permission. Usually when they deliver, they are told that only a few fees should be paid, but when they come to collect the proceeds from sales, suddenly when the voucher is issued, several deductions have been made without their knowledge. In the end they do not make a profit. So this eventually makes bumiputera IKS unable to cope. They say they cannot cope because they have no capital and cannot wait 90 days because there are too many hidden charges, so they are unable to run their business.
This matter we resolve because there will be no more hidden charges imposed. Whatever charges are imposed must be clarified when signing the agreement. So, we have resolved several related issues.
[Bangun]
However, problems arose regarding branding, packaging, and bottling, which sometimes did not reach the standards that should be achieved. So, to overcome this problem, the ministry held business matching sessions, in which we selected products that have quality that has already reached the standards, for example, products that have already succeeded in being exported abroad. It is impossible that when MITI has already taken them abroad, suddenly domestic hypermarkets say they are not eligible. If they are already able to penetrate overseas markets, they are certainly eligible to sell their goods domestically. So, in the end, we call whichever ones we consider qualified, goods that have quality, and we hold a programme we call the Business Matching programme, in which we invite hypermarket operators and bumiputera IKS to sit together and discuss the matters I mentioned earlier and place orders for the goods needed. That is domestically. For overseas, I am answering the question of the Honourable Member for Kinabatangan. The Honourable Member for Kinabatangan's question was long, but the question was short, and the answer is long. For overseas, we hold a joint programme with hypermarkets abroad, which we call the Taste of Malaysia programme, in which we cooperate with hypermarkets, whether or not those hypermarkets have branches in our country. The Taste of Malaysia (TOM) programme has been carried out since 2005, and seven programmes have been held. Up to today, I am informed, 1,305 SKUs involving 108 suppliers, their goods have been listed at Giant Singapura, Giant Indonesia and Welcome Hong Kong. For the nearest timeframe, namely 3 to 5 December, the Taste of Malaysia programme will be held in Dubai, UAE. So, those are, Honourable Member for Kinabatangan, several programmes that we carry out to hold matching or business matching between bumiputera IKS and hypermarkets, whether domestic or overseas. I give the floor to the Honourable Member for Indera Mahkota and the Honourable Member for Putatan.
Thank you, Mr Chairman. Indeed, the answers from all of them just now, I actually understand that the Minister wants to explain the justification for the target of 30 per cent listing of IKS products in hypermarkets. That is to say, in the matter of the local market controlled or held by hypermarkets just now. That target is indeed good, and I understand the Honourable Minister has said that so far the achievement is still far from that target. I too wish to discuss whether the Honourable Minister's ministry has a strategic plan to achieve this, 30 per cent.
Given the reasons provided, with the existence of hidden costs and so on, it appears like manipulation or oppression of the industry or of the players in our IKS. The government has indeed provided many initiatives. Recently, through Ekuinas, there was also a move to bring the same interest to IKS. I would like to ask the Honourable Minister's view. Indeed, these hypermarkets have been established for a long time and they have received many facilities. Discussions on this matter have been long and lengthy, many sessions have been held on this matter. It seems the same thing still happens. I think there may be another hidden matter that does not make these hypermarkets feel there is an interest in gaining or in bringing IKS along to succeed, not just to be listed, as was said earlier, manipulation of the credit terms set so that we are not successful in surviving. Perhaps hypermarkets could be required, for products that are present or to reach this 30 per cent, we could require them to open a small share or equity in the IKS company whose products are offered, or require the hypermarket to hold perhaps 5 per cent, 10 per cent or 15 per cent of the equity of the IKS whose products are in their supermarkets. They also become equity holders in that IKS. Since they have been receiving the facilities given by the government, provided by the Honourable Minister's own ministry, if that has happened, what is wrong with binding them to also be stakeholders in that IKS company? In this way, they will feel the responsibility is bound by legal binding, which means they cannot feel that the IKS is merely represented by its products being in their supermarkets, but the equity of the company is also held and it becomes the responsibility of the hypermarket company to succeed together in marketing each other's products. Otherwise, both of them will lose. In this way only, benefits can be gained together or risks can also be shared together if we require this matter. Thank you.
Thank you, Mr Chairman. I would like to ask the Honourable Minister, whether aware or not, that there are efforts not only carried out by IKS, but also small-scale industries called 'bracket industry' for bumiputera groups that make one product or two products sold through websites. What is the role of the ministry towards entrepreneurs such as the following? Although matchmaking was touched on by the Honourable Minister just now through MITI, through business chambers and so on, what I know, Honourable Minister, is that these small-scale entrepreneurs through IKS have promoted their products through websites, and I understand that the income from these efforts can be marketed internationally. So, my question to the Honourable Minister is, does the ministry monitor the quality of products produced by these entrepreneurs? If so, how many of these entrepreneurs who certainly do not sell these products to hypermarkets, but sell through websites? So, I think they can earn greater profits than struggling to market their products to local hypermarkets. Are these products not of the same quality as products in hypermarkets, or vice versa? So, my question, I ask for an explanation from the ministry: does the ministry monitor the actions of these entrepreneurs who quietly do so at village level, but through websites?
Honourable Member for Indera Mahkota, actually I think the Honourable Member is aware that the matter of manipulation that I just mentioned has been resolved, and in fact it may not have been manipulation, but a slight misunderstanding, with your permission, between bumiputera IKS and the hypermarkets.
In terms of conditions, for hypermarkets taking equity in bumiputera IKS, I think this is not in line with the policy the government has made. In fact, we are trying to restrain hypermarkets from dominating all retail business in this country, and that is why we have guidelines. At present we do not allow hypermarkets, for example, to open their businesses in small towns, so that they do not dominate the distribution and retail market..
The Honourable Minister...
Wait...
Whether we realise it or not, if we do not make regulations like that, then even informally they have in fact already dominated IKS products. Compared with our formal approach, where we announce and allow them to hold equity, in fact they have indirectly already held equity in IKS products without our realising it, or perhaps we do realise it but feel, we got nothing to do about it, with permission. How so?
I do not agree. Because if we look at today, in fact if that is what we allow, I think in the end all trade, distribution and retail will eventually be dominated by foreigners such as these hypermarkets. They have such huge capital, and if we allow them to take over equity in all the small shops, they will have interests, all bumiputera IKS will be allowed to have interests, and eventually all the interests in this country will have their hands, clearly, in every business that exists. Because they themselves are now trying to get us to allow them to open convenience stores or general stores, for example 7-Eleven. This is so that they can go to every town in the country. If we allow it, it means the interests of foreign hypermarkets will be across the whole country, including small towns, not just Kuantan, a big town; even Bera will have these hypermarkets through their networks, through their convenience stores and so on. Nevertheless, today we still want to protect the interests of bumiputera, the interests of these bumiputera IKS and the interests of small companies in the country. That is why we still adhere to the original guidelines, so that is why we do not allow it. It is true that if we could open up to IKS, any IKS products that are considered viable, they will take control of them, they will be there, but in terms of the guidelines we still do not allow it. I think the Ministry of International Trade and Industry (MITI) itself also has this policy, namely that for these IKS, we do not allow foreign equity to be given an opening within bumiputera IKS. I think this is the guideline issued by the government, including MITI and so on, to protect the interests of bumiputera. I think we can do it, by having hypermarkets allow bumiputera IKS goods to be marketed in their hypermarkets. That is in fact one thing the government does to ensure their products can be marketed. That is why I said earlier that there are now 10,000 SKUs in our country and we will add more to the 30 per cent just now, perhaps up to 20,000-30,000 and so on. However, it will take quite a long time. Moreover, the percentage just now, if we are talking about percentages, if the goods in hypermarkets increase, then that percentage will certainly become smaller. If the products in hypermarkets increase a great deal, the percentage will become smaller. Nevertheless, we do not take this matter as an obstacle and we will continue to add these products.
[Bangun]
Thank you, Honourable Member, and thank you, Mr Chairman. Honourable Member, I see that there is a loophole in our system, namely that hypermarket licences are issued by the government and the ministry.
Why not certain terms to protect these local IKS, required to be compulsory or mandatory, namely that they may not impose any conditions that could confuse, which is why suspicions arise that there are elements of manipulation imposed by hypermarkets on our IKS, so that we cannot develop in a balanced way. Therefore, does this ministry intend to look at the existing systems, namely to change them, namely if necessary to enact a new act, enact a new act to protect our local IKS. This is so that they are able to market or sell their products to hypermarkets without overly strict conditions, such as 30-day payment. Why 30 days? This is because for these small entrepreneurs, 30 days means they still have to borrow from SME Bank and of course there is interest to be paid. Why not, the moment the goods or products are delivered, they must be paid. These hypermarkets are billionaires, they have money. Why, when buying goods from outside their country, can they buy in millions, but for RM20,000-RM30,000 they have to create a 30-day term? I think the Honourable Member, as a new Minister in this ministry, should make a change. Look at which acts and regulations are seen to undermine the development of IKS below, and change them. The Honourable Member needs to have the courage to break a tradition so that we see our IKS grow and our country become developed. We cannot stay in the old position like this, with only what exists, so that we have to negotiate with the other hypermarkets...
[Bangun]
There is no need to negotiate, because this is our authority to impose conditions on them, not for them to impose conditions on us. So this is what I urge, and the Honourable Member must do it to ensure that these IKS below develop and progress, and not "scratch in the morning, eat in the morning; scratch in the evening, not knowing what to eat at night." Thank you.
Let me continue briefly, Minister, and thank you, Mr Chairman. I also feel compelled because I discussed this matter in the recent debate, when I interjected on the Honourable Member for Sungai Petani. Minister, if possible, this House should receive an open explanation: has the ministry really thought through this whole matter? If I may term it, with permission, "thinking through with the end in mind." What I mean is that when we have opened this country and integrated it into a liberalisation agenda that is bigger than this, this is the consequence, Mr Chairman, this is the consequence. Right now we are receiving all the consequences of that liberalisation. I do not say it is negative or that it is something wrong. But what I am very worried about, Mr Chairman, is that we have not thought about this matter with a thinking-through mindset, which in other words should have been put in place. I have often mentioned the competition act, the Anti-Trust Law, which would be able to prevent the matters raised by the other Honourable Members earlier. So if we do not do this, Mr Chairman, I am very worried, because it is not only IKS, we are also talking about an entire retail sector. Some time ago, a former Prime Minister spoke about how bumiputera should be propelled in the retail sector. Today I read a little from the Malay Chamber of Commerce: 12,000 bumiputera small retailers are now in difficulty and 480 are about to be auctioned. So I cannot yet imagine what the end of this scenario will be if we do not introduce and establish that competition act.
There must be this competition law. This involves everything all at once, not retail-retail, thinking in small retail terms like this, Mr Chairman. When one MP stands up, we also respond like that. It cannot be piecemeal like this. This House wants the ministry and the Minister to think about this whole matter in a thinking-through way, its entire business process and its supply chain. Hypermarkets may exist, but let them operate in the big towns.
However, even Kuala Selangor now already has a Tesco. So we cannot imagine how many small shops will close in that area. So I am very worried about all this, which is why I often raise it like this. The West has gone through this episode and scenario. So we need to learn too. So I am very worried because in the West there is no longer any such law or Competition Act, the Competition Law, Anti-Trust Law, which prevents the marginalisation of IKS and retailers, not only bumiputera but all of them, Chinese and Indians alike. Therefore I ask that this matter be dealt with thoroughly with a more comprehensive mindset than what we are witnessing now. Thank you, Mr Chairman, thank you, Minister.
Thank you, Mr Chairman, thank you, the Honourable Minister. I also wish to share with my colleagues regarding IKS, the suppliers to these hypermarkets. If the policy is made on a bill-to-bill basis, with your permission, Mr Chairman, we would have no problem, because these IKS have difficulty in turning over capital. However, what is practised by the hypermarkets here is that they set payment policies of 30, 60 and 90 days. That means if the policy is set at 90 days, more than 30 days, 30 days is already difficult. However, whether or not we can discuss it, the government should discuss with the hypermarkets so that the bill-to-bill basis becomes a more suitable method. Once the delivery is made, the collection for delivery has been done. I think that cycle can be carried out, because if we do not do it like this, in this sector of retailing and wholesaling, it is too widespread. Sometimes it is controlled as if it were a cartel that governs the situation, which causes difficulties for bumiputera IKS if we want to raise their capacity. Goods are placed in sections and corners that in fact do not attract customers' attention. Several colleagues have raised this matter, so that is why we ask that, in a situation where we are able and still in control, as my colleague the Honourable Member for Kuala Selangor pointed out, let us carry out closer monitoring of this problem...
Enforcement - the same, a little?
[Bangun]
Still long, Honourable Member, still long?
Mr Chairman, I can shorten it.
About 15 minutes is fine, until 1 o'clock.
If it's 15 minutes, no.
Tidak boleh.
There are several other issues. The important issue raised is direct sales.
Okay, please, Honourable Bakri.
Thank you, Mr Chairman, thank you, Minister. I wish to move to another topic.
[Bangun]
For the Minister's information, this is an important problem because The Star newspaper carried this SMS fraud issue in its headline yesterday, 28 November 2009.
Isu apa?
SMS.
I will answer that later. This is the hypermarket one first. The Honourable Member for Indera Mahkota.
Okey.
Okay, just briefly, Mr Chairman, following the Honourable Member for Kuala Selangor and also the Minister, who answered earlier regarding the problem of working capital and the capacity of IKS. I want to ask the Honourable Minister's view: are we aware that at this stage, products from foreign countries, especially China, 70 per cent of the domination of these products comes from IKS-based products, in terms of toys, hardware, goods that are easily found including stationery and so on. 70 per cent are dominating our market and all of them are IKS-based. One interesting point here: last year we were also told that the Chinese government decided to make a massive withdrawal of its deposits from the World Bank, withdrawing nearly USD2 trillion, because its purpose, it was said, was better. They invest in and develop the small and medium industry sector in their own country. In a situation where they have already dominated 70 per cent of these product areas in our country, they still use power and large injections of capital to generate even greater domination of IKS across the world, perhaps. But do we have a standard of policy taste from the ministry that could at least be close to or equal to this scale? Yet last year we dissolved the ministry specifically responsible for looking after the position of IKS, and we distributed this role among several ministries. There is MITI, there is the Honourable Minister's ministry, under the Ministry of Rural and Regional Development. Does this show that, rather than gathering energy and resources to develop IKS, we are chopping off, dividing and shrinking our scale even further? How, then, are we going to achieve a policy strong enough to expand this IKS? Thank you.
The proposals from the Honourable Member for Kinabatangan, the Honourable Member for Arau and colleagues to tighten the conditions for hypermarkets. Firstly, we need to realise that hypermarkets are a business entity. We need to know that first. They are not social welfare and so on. We need to know that first. They are business companies, so of course, apart from social contribution, their CSR and responsibility, they also have other aims such as profit and so on. We must understand that. I would like to inform you that the conditions imposed by our government, the Ministry of Domestic Trade, Cooperatives and Consumerism (KPDNKK), on hypermarkets are, I am informed, the strictest when compared with the conditions imposed by other ASEAN countries on these hypermarkets. Hypermarkets are foreign investors, foreign investors, and they look for a country that is friendly to such foreign investment. We are seen as the least friendly country to these foreign investors. However, I agree with the Honourable Member for Kepong, actually, that we should look at these hypermarkets in a bigger picture. I also agree with the view of the Honourable Member for Kuala Selangor, that we need to see hypermarket investment within the big picture, in a wider perspective. Not focused on just one issue, but the bigger issue. We see that the Honourable Member for Kepong also gave that view and I agree. We need to look at the contribution, for example, of hypermarkets to the country as a whole. The effects of the presence of hypermarkets, for example, on employment opportunities: nearly 50,000 job opportunities are created, for example. That is one matter. Secondly, in terms of consumers, for example, they can make choices by buying goods more cheaply compared with other places. The competition created by hypermarkets, although it is uneven competition because they have bigger capital, at least puts pressure on the traders who have monopolised their areas until now with high prices. They have to bring prices down.
Usually local supermarket retailers, retailers generally, make their own decisions on determining prices, but with the presence of hypermarkets in their areas, they have no choice but to lower prices and so on. This benefits consumers in the surrounding areas, if we look at it from the consumers' side. Retailers, for example, village retailers, usually buy goods from wholesalers. Because they buy goods from wholesalers in small products, for example ten bottles of soy sauce, for the wholesaler to deliver to their areas, they have to pay high prices even though they buy from wholesalers. I am informed that with the presence of hypermarkets, it is cheaper for them to buy these goods at hypermarkets because they buy small quantities compared with buying from the wholesalers who have been distributing these goods to them all this while. For local retailers too, the arrival of hypermarkets in their areas will benefit them in obtaining cheap goods, because all this while they have seemingly been oppressed by the wholesalers who act as middlemen. All this while we have spoken of middlemen who oppress wholesalers in the villages; they buy from wholesalers who come with lorries and so on, are oppressed, and the prices are high. But today, because of the competition from hypermarkets, they can buy in small quantities and at low prices from hypermarkets, and avoid the wholesalers who have all this while oppressed them and acted as middlemen. We also look at the wider context, from the aspect of the environment, from the aspect of value, land and so on, which will appreciate (with permission), which will increase in value as a result of the construction of hypermarkets and so on. We look at it on a large scale and a small scale. On a small scale, we only look at the importance of hypermarkets in helping bumiputera small and medium industries (IKS). I want to state that for the matter of bumiputera IKS, their businesses do not depend solely on hypermarkets, but there are many other matters which I believe the MITI, for example, has many programmes implemented to help bumiputera IKS, with SMIDEC, SME Corp. Malaysia, and so on, under MITI. Many opportunities have been created by MITI through MATRADE, for example, to go overseas and so on. These are only part of the Government's efforts. This is to answer the question of the Honourable Indera Mahkota earlier: part of the Government's efforts to help bumiputera IKS, MARA for example, under the Ministry of Rural and Regional Development, has various programmes to help these bumiputera IKS. However, I do not in any way deny how important this ministry is in developing bumiputera IKS. That is why I said earlier that some matters restrict bumiputera IKS goods from entering hypermarkets, because the manipulation mentioned earlier, we have already resolved. There is no longer a 30-day credit term for my colleague the Honourable Arau, who said 30 days is so long. The Honourable Kinabatangan as well, such a long period, it should be COD (cash on delivery): when goods are delivered, pay cash immediately. This matter I have to... Yes?
[Menyampuk
Alright. That is one of the proposals I can raise, which I can bring to hypermarkets. We will continue to impose conditions, which is why I want to inform this House that the ministry, for example, has been under pressure from hypermarkets to add more hypermarkets throughout the country. From a ratio of 250,000, they asked for it to be reduced to 100,000, and asked that they be allowed to open convenience stores throughout the country, and that they be allowed to franchise hypermarket businesses throughout the country. These are their demands, and so far the ministry still remains firm on the original policy, which is that it is not relaxed, and the conditions remain strict.
Although we are regarded as the country with the strictest conditions on hypermarkets, we still hold on to these conditions. However, I would like to state that for how long, this is the question mark, big question mark that we must have. For how long can we maintain protective policies like this? How long..., 10 years from now, five years from now, or 20 years from now? Will we continue with this protective policy to protect bumiputera interests? Or do we develop bumiputera to produce quality products, to produce products with good branding, with permission, to produce good packaging quality, to have good bottling, and when consignments are delivered, to be consistent in their delivery? Are we moving towards this, or will we continue to depend on these quotas so that we end up as a group that is unable to compete when one day we have to open our market to the world?
Thank you, Honourable Minister, Mr Chairman. I have studied the Minister's debate, which is very good, and I can also state that the Minister has a good command of the issues being addressed. Only what we mentioned at the beginning, neither this House nor my friends who argued earlier, reject the importance of opening the country to liberalisation. That is the reality of the world today: we have to compete and open to the market and a free market economy, and the Minister also spoke about the hidden forces or the hidden hand that... market forces, which will ultimately be good for consumers, the public and the people. We understand all that, but let us not fail to know the importance of avoiding its harm. Perhaps the Minister knows this too, but it has not been presented yet. The interest for the time being is what we want, all of this is considered FDI too, all of this is considered foreign investment too, yes. But we also know that in the end they will repatriate the profits out. Therefore, if I may say so, what was meant earlier is that while we... This matter is very important for stimulating and boosting our economy, what is needed is not protection but also, in the West, foreign countries too, developed countries also have a Competition Act. The Anti-Trust Law, that policy needs to exist to prevent, because here there is the hidden hand, which is called the invisible hand, market forces sometimes have distortions or harms. I think the Minister understands this, but please try to balance that argument so that this matter can be studied better and more comprehensively. Thank you.
Thank you, I indeed forgot earlier. Actually, it was in my reply to the interjection from Kuala Selangor regarding the Competition Act. In fact, the Competition Act is ready, whether it will be tabled as early as possible in this session for the first reading, or at the latest in the next session in March for the first reading. Indeed, in the Competition Act, we have included protections, both in terms of cartels, that is, we will not allow the use of dominant power to determine prices through cartels as mentioned. Likewise with monopolies. We will also not allow monopolies, this Act will curb monopolies. Because we know that monopolies cause prices to be determined, dominant power creates cartels and establishes a certain price. We know this is what will burden consumers and so on. We fully understand this matter, which is why this Act has been completed. It is now at the Attorney General's Chambers at the final stage (legal scrubbing). This is at the final stage, God willing, if permitted, once completed it will be presented again to the Cabinet, and if it obtains Cabinet approval, we will table it in this session. If this session is the first reading, the second reading will be presented in the next session. So I would like to continue, if permitted by Mr Chairman.
[Speaking without using the loudspeaker]
Okay, the answer from the Honourable Putatan earlier, that indeed we do not have... The Honourable Putatan mentioned monitoring of products sold through the internet. So far the ministry has not monitored the sale of products sold through the internet and so on; so far there is none. However, we will amend our consumer act and we will make a regulation regarding products bought through the internet, for this e-commerce. For every sale, clearer regulations will be issued through regulations later. This is what the ministry answers, and so far there is nothing more. Thank you.
The Honourable Minister may resume this evening.
Thank you. The House resumed sitting [Mr Speaker in the Chair]
Honourable Members, we shall suspend the sitting until 2.30 p.m., thank you. The sitting was suspended at 1.01 p.m. The sitting resumed at 2.30 p.m. The House is in Committee. [Deputy Speaker (Datuk Ronald Kiandee) in the Chair
I invite the Honourable Minister to continue the reply.
Thank you, Mr Chairman. Allow me to move on to another topic.
Just a moment, Honourable Member, there is an announcement. Honourable Members, I welcome the presence in this august House of Honorable Robert Smith, President of the Legislative Council and Joint President of the CPA Victoria Branch, Australia... [Applause] I hope his presence in this House will further strengthen relations between Malaysia and Australia... [Applause] Yes, the Honourable Minister, please.
Thank you, Mr Chairman. I wish to move on to another topic apart from hypermarkets, as we have been on that topic for a long time. The Honourable Kuala Krai proposed that the ministry establish a permanent distribution centre or expo centre for local goods, as implemented by MITI. As the Honourable Member stated, the distribution centre, namely the Malaysia Export Exhibition Centre, has already been implemented by MATRADE under that ministry. As for organising expos, local authorities play a role in issuing permits and so on to organisers. So for the ministry at this time, the ministry does not intend to establish a permanent expo centre for expos of SMI goods or local products.
However, the ministry, through the Buy Malaysian Goods Campaign, continues to carry out campaigns to promote Malaysian-made goods. The Honourable Batang Sadong asked how to join the Small Entrepreneur Guarantee Scheme (SJUK). For the Honourable Member's information, this scheme is implemented by two agencies: by TEKUN Nasional under the Ministry of Agro-Based Industry (KPIAT), and also under the Council of Trust for the People (MARA) under the Ministry of Rural and Regional Development (KKLW), while for the Bumiputera Technopreneur Programme, it is implemented by MARA. The Honourable Member also wishes to obtain clarification on the Trade and Consumerism Training Programme. For the Honourable Member's information, it is divided into four categories: (i) the Consumerism Training Programme implemented by the consumerism division of the Ministry of Domestic Trade, Cooperatives and Consumerism (KPDNKK) and all state offices; (ii) the Intellectual Property Training Programme implemented by MIPO or the Malaysian Intellectual Property Corporation; (iii) the Train and Work Programme, open to school leavers, diploma and degree holders; and (iv) the Enforcement Training Programme, reserved for enforcement officers only. Mr Chairman, many Honourable Members raised the issue of direct selling. The Honourable Pasir Mas wanted to know the number of direct selling companies and the percentage of local ownership compared with foreign ownership. At present, there are 705 direct selling companies by category as follows:- (i) multi-level marketing, 457; (ii) single level, 179; (iii) single-level mail order, 32; and (iv) mail order, 37. Of this total, more than 90 per cent are locally owned while 10 per cent are foreign owned. He also wanted information on local companies that can be used as examples and can be considered successful and so on. I will give just a few examples. Among local companies that can be considered successful and can be used as examples are CNI, Zhulian Marketing Sdn. Bhd., Gamat Emas Sdn. Bhd., DXN Marketing Sdn. Bhd. and others. Meanwhile, foreign-interest companies with foreign equity are as follows, namely Avon Cosmetic, Amway, Cosway and also Shaklee Sdn. Bhd. As for the Direct Sales Act, there are indeed some weaknesses. Therefore, the ministry intends to amend the Direct Sales Act 1993 by including broader clauses on Pyramid Schemes. The Act is being amended because it was found that the existing Act has gaps and cannot take effective action against fraud carried out over the internet.
Apart from that, enforcement aspects are also being tightened to impose higher penalties on those who promote pyramid schemes. In addition, the definition of direct selling will be amended in line with current developments; with this new definition, direct selling business or promotion or internet fraud can be monitored and action taken. The amendment to the Direct Sales Act is expected to be tabled in Parliament in March 2010 for the first reading.
From the aspect of public awareness, KPDNKK constantly conducts roadshows on consumerism and disseminates information to the public through participation in expos such as Unit Trust Week and Consumer Day. Apart from that, KPDNKK will also issue a special supplement on direct selling in newspapers in the second week of December 2009...
Minister, may I ask a little about direct selling? Thank you, Mr Chairman and the Honourable Minister. Earlier it was said there are weaknesses in our Act regarding direct selling in the form of pyramid schemes. I would like to ask the Minister that now, indeed, it is not only direct selling that has involved property such as those building condominiums or resorts using methods such as recruit membership and charging payment for membership, after which members are promised they will get these apartments according to the payment schemes, but this project has absolutely not taken off. I would like to ask the Honourable Minister, say in recent years, how many companies or syndicates have been subject to action? I have mentioned several direct selling companies whose intention is to defraud their members or buyers, which is already clear, and police reports have been lodged and investigations have been carried out, but still no action is seen against those involved. May I know how many companies have been subject to action in recent years? Thank you.
For the information of the Honourable Kota Melaka, during the period from January to October 2009, a total of 138 complaints were received relating to direct selling licensing. Meanwhile, direct selling malpractices amounted to 503 complaints received by us. Regarding the action that can be taken, I can only tell you about the action that can be taken under the Direct Sales Act. Most of the companies carrying out business as mentioned by the Honourable Member earlier are mostly companies that are not registered under the Direct Sales Act. Under section 4 of the Direct Sales Act, the action that can be taken against traders carrying out direct selling without a licence is a penalty of RM100 thousand for individuals and RM250 thousand for companies, and three years' imprisonment for those who operate it. So as for the total number of actions taken so far, I will obtain that information and give it to the Honourable Member, because I do not have the statistics at this time.
Thank you, Mr Chairman, I would like to add a little, which is the mobile wallet I mentioned earlier and one of the ways companies that claim to have Multimedia Super Coridor (MSC) status, wanting to obtain their status, which is also a direct selling matter that has been investigated by Bukit Aman. I would like to know the developments on the direct selling of this company, which I recall has been quiet for almost a year with no developments on this investigation. Thank you.
May I continue a little, Honourable Member? Earlier the Honourable Member mentioned that at present only the laws under section 4 can be used to take action against those who commit malpractices in direct selling businesses. So I ask the Honourable Member whether the Government intends to review the law under section 4 and, if it is still insufficient and needs to be tightened and penalties increased. Apart from that, is the Honourable Member aware that much of the malpractice in direct selling companies is perhaps by unregistered ones, linked to the Cepat Kaya Scheme. This is the biggest problem, whereby they use the direct selling method but collect money from villagers using certain agents, and many have already suffered, including even the intellectuals who have been cheated because they want to get rich and get money quickly. So if this is not addressed quickly, it will continue to burden, and the victims will be the innocent villagers.
So I ask the Ministry to think about how to take truly serious action to punish these irresponsible people, because the current methods, of which there are many, have caused the burden I mentioned just now. Thank you.
Thank you, Honourable Pasir Mas. I agree, and the Ministry will indeed amend the Direct Sales Act, because we acknowledge that there are several weaknesses and gaps in the Act, which ultimately give these irresponsible people the opportunity to carry out these immoral activities. We plan to table it in Parliament next year. To answer the question from the Honourable Kota Melaka earlier, about the mobile wallet, it is indeed unlicensed and action is now being taken by Bank Negara Malaysia. As for its status, I am trying to obtain it from Bank Negara Malaysia and will give it to the Honourable Member in writing. To help the public, to make them aware of the dangers of multilevel marketing schemes, pyramid systems and so on, apart from issuing a special supplement in the newspapers this December in which we will list the registered companies, so that they can make comparisons if any agents come to see them, they can tell whether the company is registered or not by looking at the supplement that will be issued later. In addition, the Ministry will also set up a special line, a special telephone line, so that those who doubt the companies that come to meet them can obtain certainty as to whether the company is registered or not, and what the company's status is, by using the infoline or hotline that the Ministry will set up. Thus, anyone who wants an explanation about the agent who has approached them can contact the Ministry directly. This is one of the ways the Ministry can help the public, as the Honourable Pasir Mas said, namely that people in rural areas are often cheated by irresponsible and unregistered direct sales agents and multilevel agents. Mr Chairman, I would like to refer to the question raised by PJ Selatan about Island Red Café. For your information, Island Red Cafe is not a company registered under the Direct Sales Act. It is an investment company based on a vested-interest scheme, and it is registered under the Companies Commission of Malaysia.
At present, SSM, the Companies Commission of Malaysia, is conducting an investigation under the Companies Act because it is offering an invalid investment scheme in the form of a vested-interest scheme to the public. Any company that wishes to offer a vested-interest scheme to the public must first register that scheme with SSM, the Companies Commission of Malaysia. If the method of offering is in the form of multilevel marketing, the company must obtain a licence under the Direct Sales Scheme. The Ministry found that Island Red Cafe is also running a franchise business and collecting franchise fees. This act is also an offence because the company is not registered under sections 6 and 37 of the Franchise Act 1998. Then, the Ministry has in fact already warned Island Red Cafe and ordered that the franchise fees collected be refunded. I have also been informed that Island Red Cafe is also under investigation.
Pendek sahaja.
Honourable Petaling Jaya Utara, okay.
Regarding Island Red Cafe, because we have also received complaints, has the Ministry taken action to freeze the assets of the owners or operators of Island Red Cafe?
This is because, usually, although an investigation is carried out, it takes too long, and these owners or their operators have already fled with the money invested by the public. Thank you.
I did indeed want to answer that question, but if I say that action will be taken to freeze their accounts, they can cipher the money immediately. So, let me answer the Honourable Petaling Jaya Utara individually. I do not want this to become a reason for them to cipher, with permission, the money. Thank you. I now move on to the matter raised by the Honourable Labuan. The Honourable Labuan is not here. Regarding the issue of the shortage of RON-97 supply in Labuan. For your information, the Ministry has indeed already directed all oil companies to provide at least one RON-97 pump at each of their petrol stations. At present we find, I have been informed, that of the six petrol stations in Labuan, only one petrol station sells RON-97. Therefore, the Ministry will take action to direct other companies too to provide RON-97 pumps at their respective petrol pumps. On the issue of sugar, this issue was raised by the Honourable Indera Mahkota, on whether the government is looking for a substitute sugar to replace the existing sugar, which has a high glucose content and is also harmful to health. With reference to that proposal, the Ministry is currently cooperating with MARDI and the Ministry of Health to study the suitability of a sugar substitute to replace ordinary white sugar, to ensure there are no side effects that could harm consumers. So, Honourable Indera Mahkota, we are indeed studying the matter. However, it must obtain views from the Ministry of Health and so on. The Honourable Tenom informed that in the Tenom district there is a clear shortage of KPDNKK officers, especially enforcement officers, and proposed that an office be established in Tenom and so on. We have been informed that the Tenom district falls under the care of the PDNKK branch office in Keningau. Up to today there are 16 officers at the PDNKK office in Keningau, and of those 16, 14 are enforcement officers. At present, the Ministry has no plan to open a new branch in Tenom, because it is of the view that the PDNKK office is still able to bear the existing workload. However, if there is a need in the future, this matter can be proposed to the government. On the issue of piracy and copyright. The Honourable Telok Intan raised the use of price tags and whether the enforcement division carries out monitoring and inspection of business premises on a regular basis and not unexpectedly. The same matter was raised by the Honourable Tenom. I am pleased to inform that monitoring and inspection by enforcement officers is a core duty, with permission, for every PDNKK office anywhere in the state or district. As a result of inspections throughout the country from January until 31 October 2009, a total of 1,020,629 business premises were inspected and 591 cases related to offences under the Price Control Act 1946 were detected. Of these, 98 cases were offences of not placing price tags, that is, a breach of the Price Control Order 1993, and compound amounting to RM77,250 was collected for 190 cases of offences under the Price Control Act 1946. The Price Control (Price Marking by Retail Sellers) Order 1993 requires retail sellers to place price tags on goods to be offered or sold. If there is no price tag on the goods, a compound may be imposed on OKK, that is, orang kena kompaun, at a maximum of RM7,500, while the court fine shall not exceed RM15,000 or imprisonment not exceeding two years or both. For corporations, the fine shall not exceed RM25,000.
If there are business premises that do not place price tags on goods offered for sale, they may make a complaint and channel the information to the toll-free line or by SMS, or they may lodge a complaint at the nearby Ministry office. The Honourable Langkawi raised the issue of how far the Ministry's enforcement action against the smuggling of petrol and diesel at the border goes. For your information, the Ministry always carries out inspections of licence holders who handle controlled petrol and diesel goods. The Ministry always works together with other government agencies such as UPP (Unit Pencegah Penyeludupan), the Customs Department, the Malaysian Maritime Enforcement Agency (APMM) and also the Marine Police from time to time. As a result of integrated action carried out from January to November 2009, 80 cases involving diesel have been acted upon, with seizures valued at RM321,728. As for the Honourable Langkawi's proposal that the use of nanotech be continued, I am pleased to inform that this nanotech programme is indeed ongoing.
Honourable Minister, may I interject.
Ya.
With permission. Honourable Minister, regarding nanotech, I understand that some years ago, a company called Teras Kimia Sdn. Bhd. was given work for monitoring and enforcement with the Ministry regarding diesel that is tagged. Does that company still carry out that work, or has another company been given the opportunity, and what expenditure has the Ministry incurred to overcome the problem of diesel sales, including diesel, with permission, on the high seas, where diesel is sold to parties, I believe, to fishermen in Thailand as well. Has this problem been overcome, and to what extent has the Ministry's achievement been so far? Thank you.
For your information, Teras Kimia is still being given the role of operating this nanotech programme so far. As for expenditure, I do not have a clear answer. If I am not mistaken, it is RM114 million a year, if I am not mistaken. If there is an error, I will inform you. The effect, as I mentioned just now, is that arrests continue to be made against subsidised diesel oil that contains nanotech, and it is easier to detect because of the difference in colour between the nanotech-marked and unmarked oil. So, if oil marked with nanotech is found outside our national waters, that means the oil is smuggled oil. Let me correct myself, RM117 million. The Honourable Indera Mahkota raised the issue of whether the Ministry has taken into account the situation of the Consumer Price Index (IHP) before raising any petrol price, to reduce the effect of the increase in the prices of goods, especially during the festive season. The Ministry is indeed aware of this matter, and simulations of the effect of oil price increases on the IHP were indeed carried out. However, I know what the Honourable Indera Mahkota means, namely whether the increase in oil prices on 1 September last year had an effect on the Consumer Price Index. I would like to inform that there was no increase in the Consumer Price Index because goods sold in our country are transported using vehicles that run on diesel. Up to today, the price of diesel has remained as usual and there has been no increase. So, that is why there has been no increase. Moreover, during the festive season, namely the recent Hari Raya Puasa, the government implemented a festive season price control scheme by imposing ceiling prices on 17 items used during the festive season. I would like to share these statistics with all of us, for the Consumer Price Index for the period January to October 2009, it shows an increase of only 0.6 per cent.
For September 2009, that is after Ron95 petrol was introduced, the Consumer Price Index between September and October, over that one month, rose by only 0.1 per cent, which is too small, as if no increase had occurred. Several Members of Parliament raised the issue of intellectual property. It was raised by the Honourable Indera Mahkota, the Honourable Tenom and also the Honourable Balik Pulau. I would like to thank the Honourable Members for their attention to intellectual property, particularly the role of the Ministry through the Intellectual Property Corporation of Malaysia or MyIPO, and also the enforcement division. However, as I explained earlier, the national innovation ecosystem covers the aspects of promotion, creation, protection and commercialisation. While the main role of KPDNKK is to provide protection, ministries such as MOSTI, the Intellectual Property Court, the police, customs, the Ministry of Education and the Ministry of Higher Education are also responsible for ensuring a conducive intellectual property environment. The Ministry does not deny that tackling intellectual property rights, including pirated products, is a major challenge for all countries, especially developing countries such as Malaysia. Up to 30 April 2009, a total of 12 countries had been listed as priority watch list countries and a total of 33 countries had been listed as watch list countries, including Malaysia. Several developed countries such as Finland, Italy and Norway were also listed under the Watch List of the US Special 301 Report, with permission. Technological advancement has in fact enabled products to be copied at lower cost, produced with higher quality and distributed more quickly and widely, including through downloading via the internet. With continuous enforcement, Malaysia, which was once placed on the priority watch list in the US Special 301 list, with permission, has successfully moved down to the watch list category in 2002. I would also like to draw the Honourable Member's attention to the fact that the focus of US Special 301 is on enforcement issues. As a developing country, we also need to ensure that the national intellectual property agenda takes into account the development perspective. Therefore, I would like to invite the Honourable Members not to raise only the negative findings of US Special 301, because the report also recognises the government's commitment and achievements in relation to intellectual property enforcement. Enforcement action under the Copyright Act 1987 against the sale of pirated materials is continuously carried out by KPDNKK's enforcement officers. For the period 1 January 2009 to 31 October 2009, the enforcement division has taken action in 444 cases with seizures valued at RM6.2 million. Of that total, 5 cases were fined in court with a value of RM29,900, while 439 cases are still under investigation. Enforcement action against counterfeit goods is taken under the Trade Descriptions Act 1972. I would like to state that, in enforcing action under the Trade Descriptions Act 1972, the enforcement division faces several constraints in the prosecution process, because to prosecute sellers of counterfeit goods, the owner of the trademark must prove their right, or as the owner of the trading rights or the representative of the owner of the trading rights. So, to the Honourable Tenom, I would like to inform that our action is not periodic, and the enforcement division will continue the actions that should be taken to curb abuses of this Copyright Act, namely the sale of illegal DVDs, VCDs, computer software and so on. As I said earlier, there are also weaknesses in the Copyright Act. So, the Ministry will make amendments to the Copyright Act. At the same time, the Ministry is also in the process of amending several acts related to copyright, such as the Patents Act 1983, the Trade Marks Act and several other related acts. All of these, we propose and plan to table in Parliament next year.
Apart from enforcement action, several Members of Parliament proposed that more awareness programmes be organised to make the public aware of this copyright.
Programme kesedaran (awareness programmes) are indeed always held, and among the awareness programmes carried out, for example every year on 26 April, the National Intellectual Property Day is held, which coincides with World Intellectual Property Day. The Intellectual Property Day Expo 2009, for example, gave special focus to intellectual property products such as traditional knowledge, genetic resources and others. At the international level too, Malaysia has received recognition from the World Intellectual Property Organization, or MyPO. Mr Chairman, the Honourable Member for Tenom also proposed that a reward scheme be established for informants, up to the arrest of those who violate the law under this Copyright Act. The MDTCC has indeed established a reward scheme, or payment of a consolation sum, for informants under the KPDNKK Secret Service Fund. Rewards will be given to any person who provides information relating to the activities of piracy and also includes the misuse of subsidised diesel and other subsidised goods. The value of the capture reward given is based on the quantity of goods produced from the complaint of the informant. In this regard, I call on all parties to provide information to the ministry to help the ministry carry out our responsibilities. The Honourable Member for Ledang suggested that the Consumer Protection Act 1999 be amended to protect consumers more effectively, especially from misleading advertisements. For the information of the House, the Consumer Protection Act 1999 is currently being studied by the ministry and is at the final stage of drafting before it is sent to the Attorney General's Chambers. It is expected that the amendment to this Act will be tabled in the Dewan Rakyat sitting in March 2010. The Consumer Protection Act 1999 has provisions to protect consumers from misleading advertisements under sections 10, 11, 12, 13, 14 and 15. The amendment to the Consumer Protection Act will later take into account the establishment of a special advertising monitoring committee to regulate the form of advertisements that mislead consumers proactively. The Consumer Protection Act 1999 was also amended in 2007 to provide protection to consumers who conduct transactions electronically. This means that electronic transactions will be protected by the Consumer Protection Act in the same way as non-electronic transactions. However, the ministry will hold, will establish, a regulation or a special regulation that will be issued relating to transactions using this electronic method. The Honourable Member for Kepong raised the issue of unethical trade practices, such as the pharmacy business. At present, Section 2(2)(f) of the Consumer Protection Act 1999 states that this Act does not apply to health care services provided or to be provided by health care professionals or by health care facilities. It falls under the National Pharmaceutical Bureau, an agency under the Ministry of Health. The Honourable Member for Telok Intan asked about the steps taken by the ministry to make the public aware of excessive sugar consumption by Malaysians. In principle, the ministry is indeed aware that sugar consumption by Malaysians is very worrying. At the same time, the government's subsidy burden to maintain sugar at its current price is also very large.
In this regard, the ministry, with the cooperation of the Penang Consumers Association and with the support of the Ministry of Health, will launch an awareness campaign on the dangers of sugar consumption, namely the Reduce Sugar Intake Campaign on 1 December 2009. So I very much hope that our campaign will receive the support of all the Honourable Members. The Honourable Member for Telok Intan also raised the problem of housing developers who do not return deposits. For the information of the Honourable Member, the problem of housing developers falls under the purview of the Ministry of Housing and Local Government, and claims must be filed with the Home Buyers Claims Tribunal. The Honourable Member for Balik Pulau, raising the extent of consumer knowledge...
Penjelasan.
Ya, ya.
Thank you, Honourable Minister and Mr Chairman. My question or the clarification I need is not about deposits, but about the awards given by the Home Buyers Claims Tribunal. When the tribunal gives an award to the claimant, there are developers who do not respect the award and make no payment, but instead they default and refuse to pay. What is the ministry's action from the perspective of consumer rights against these developers?
As I mentioned, the Ministry of Housing and Local Government has its own special tribunal on housing. As for the Tribunal for Consumer Claims, TTPM, it can only hear cases relating to claims for the return of booking deposits or advance instalment payments for buying a house, that is all. All other issues fall under the Housing Tribunal under the Ministry of Housing and Local Government. The Honourable Member for Balik Pulau asked about the extent of consumer awareness among Malaysians. For everyone's information, based on the consumer profile study conducted in 2009, the level of consumer awareness in Malaysia is at a rate of 58 per cent. The level of consumer awareness for urban residents is 61.3 per cent, while in rural areas it is 57.41 per cent. The Honourable Member for Bakri raised the issue of SMS. The Honourable Member for Bakri raised the issue of whether the ministry intends to include health services as matters that can be acted upon by the KPDNKK. In principle, the Consumer Protection Act 1999 excludes the application of this Act to matters involving professionals or health care goods and services under sections 2 and 19. Okay, Honourable Member for Bakri? As for our health, we cannot, that falls under the Ministry of Health. As for professionals, for example lawyers and so on, they have their own Acts, therefore they do not fall under this ministry.
The Honourable Member for Sungai Siput raised the issue of insurance company fraud. I would like to inform the House that issues relating to insurance fall under the purview of Bank Negara Malaysia, which also does not fall under this. The Honourable Member for Kuala Krai proposed that all supermarkets not supply plastic bags to consumers. For the information of the House, the ministry previously implemented a campaign to reduce plastic bags in cooperation with a supermarket in 2008. Recently, another supermarket in Malaysia has also carried out the same campaign. The Honourable Member for Pasir Salak, the Honourable Member for Parit Sulong and the Honourable Member for Petaling Jaya Selatan raised issues relating to franchising in Malaysia. For the information of the House, the ministry's plan is to produce 1,000 franchisees and 100 franchisors for the RMK-9. As of 6 October 2009, a total of 388 franchise systems across various sectors have been registered under the Franchise Act 1998. Meanwhile, 3,698 franchisees have been produced from these franchisors.
The number of local franchise companies that have been assisted by the ministry up to 26 October 2009 is as follows: (i) the Local Franchise Development Programme for bumiputera, 22; (ii) the Franchise Development Scheme, 13 bumiputera and 11 non-bumiputera; (iii) loan financing by PNS to 423 franchisees. The total loan amount to franchisees is RM100.5 million; (iv) the loan amount to franchisors is RM22.41 million. At present, there are several foreign franchise systems brought into Malaysia by companies from Singapore. This matter was raised by the Honourable Member for Pasir Salak. Singapore companies take the opportunity to obtain territorial rights to these foreign franchise systems by becoming master franchisees for them and controlling territorial rights in the Asian region. These Singapore companies register foreign franchisors in Malaysia because Malaysia is the only country in this region that has the Franchise Act 1998. After these foreign franchisors are registered, they will become master franchisees for the above purpose and increase the value of subsidiary companies for listing on the Singapore Stock Exchange. The Honourable Member for Pasir Mas, the Honourable Member for Telok Intan and the Honourable Member for Batang Sadong raised issues relating to Price Monitoring Officers. It is informed that at present there are 1,464 price monitors whose contracts will end on 31 March 2010. The ministry is applying to the Cabinet to agree to extend the contracts of these Price Monitoring Officers. Regarding the proposal that they be absorbed as permanent officers, I very much agree with and support the proposal. However, it is up to the JPA and also the SPA. Several Members also asked about the objective of establishing these Price Monitoring Officers. Price Monitoring Officers serve as the eyes and ears of the ministry to improve the monitoring of the supply and prices of goods throughout the country, including rural and interior areas. The PPH, that is the Price Monitoring Officers, also help to increase the level of compliance of traders with the Acts and regulations under the ministry's regulatory control, such as the use of price tags and the determination of weighing and measuring equipment. Regular and continuous monitoring by the PPH is able to prevent traders from arbitrarily raising the prices of goods. The PPH prepares weekly and monthly reports as well as brief study reports on issues of supply and prices of goods. These reports will be a reference for the ministry in formulating policies on prices and so on. Information on the prices of goods monitored daily at hypermarkets, supermarkets and wet markets can be referred to by consumers under the price watch portal to compare prices before going shopping. In regard to the issue raised by the Honourable Member for Batang Sadong, whether the ministry is aware of the increase in rice prices and the question of whether the PPH informs the ministry. I am pleased to inform you that the PPH indeed always informs us. However, regarding the determination of the selling price of rice, it falls under the purview of the Ministry of Agriculture and Agro-based Industry. So, Honourable Members, once again I extend my utmost thanks. I kept my promise to Mr Chairman to end my reply before 3.30. So, four minutes before 3.30. Finished. So, thank you once again. God willing, anything that has been overlooked and not answered just now was not intentional, and I will provide a written answer.
For any requests for statistical answers that cannot be given directly, they will also be answered in writing and so on. With the hope that the questions raised will give the ministry room to improve the duties and responsibilities of the KPDNKK. Thank you. Assalamualaikum warahmatullaahi wabarakaatuh. Selamat Hari Raya Adiladha.
Honourable Members, the question is that the sum of RM376,575,600 for Head B.25 under the Ministry of Domestic Trade, Cooperatives and Consumerism, thus forming part of the Schedule, be agreed to. The question was put, and it was agreed to. The sum of RM376,575,600 for Head B.25 is ordered to form part of the Schedule.
The question is that the expenditure of RM51,725,000 for Head P.25 mentioned in the Development Estimates for the year 2010 be approved. The question was put, and it was agreed to. The sum of RM51,725,000 for Head P.25 is approved as part of the 2010 Development Estimates.
Bill — Supply Bill 2010 and Development Estimates Motion 2010 Committee — Head B.27 [Schedule] – Head P.27 [Development Estimates 2010] -Bill
Supply Head B.27 and Development Head P.27 under the Ministry of Works are open for debate. The Honourable Member for Ledang.
Thank you, Mr Chairman. I will take part briefly, going straight to Item 010000. Firstly, I would like to congratulate the ministry for having contributed much to the country from before independence until now. I have some matters, Mr Chairman, to ask about the current role of the JKR, which is a department. Most importantly, as the engineering adviser to the government or to the country. However, at this time I want to ask about the skills training programme for JKR staff, especially those who come from various fields. There are many fields, Mr Chairman, I see here. From civil, electrical, mechanical, slopes and architecture, all sorts. Whereas I see that the allocation for JKR training, if we look at B.27, Item 60500, is only RM8 million. I want to ask, is this RM8 million for buildings or for skills programmes?
Because previously I once raised the matter that IKRAM, or the Institut Kemahiran Kerja Raya, had been sold. Now it has become IKRAM University. I also received information that JKR staff lack training and lack opportunities to upgrade their skills, whereas the current role of JKR is very high in terms of engineering to continue jointly developing the country. So, Mr Chairman, I ask that this skill become an important matter for JKR. Although JKR has contributed much all this time, recently, many buildings that have been constructed have been questioned by all parties. Some have collapsed, some have cracked and so on.
At the same time, when other incidents occur, such as bridge collapses, even though they were not built by JKR, JKR will always become the main adviser or main reference expert on the problems that arise. Mr Chairman, I want to focus on Item 30100 – Road Branch. I am more specific because, in my view, roads are important. I need to mention that if we travel or drive vehicles from the north to the south, all the way to Sabah and Sarawak, if we compare JKR roads with highways, the difference is very far. Very far apart, Mr Chairman, JKR roads and highways. The difference is very marked. So I want to ask the JKR. When will the standard or condition, if I say standard, Mr Chairman, perhaps it is not very clear, but the condition of JKR roads will at least be nearly the same as highways in terms of their signboards, in terms of their drainage system, in terms of gradients and so on. I also want to propose, Mr Chairman, that protocol roads be increased or multiplied. In my area, Mr Chairman, I humbly request that the JKR consider a protocol road between Tangkak town and Sungai Mati. From Tangkak toll to Tangkak town and from Tangkak toll to Muar town. The meaning of 'protocol road', Mr Chairman, is a road whose condition is very comfortable. Not only is the road beautiful, the drainage system is beautiful, there is landscaping, there are clear and adequate signboards, there is complete road furniture. The drainage system can also accommodate, Mr Chairman. It can accommodate a large volume of water. Sometimes when we deal with JKR, they often say that the roadside drain is for channelling water produced by the JKR road itself, whereas in the current situation, Mr Chairman, roadside drains are not merely for JKR roads but also to accommodate water produced and discharged from the surrounding areas. From JPS drains and so on. In the end, the JKR roadside drains are not big enough and are not sufficient to accommodate the water that has to be taken from the surrounding areas and can cause flooding. That means, the function of JKR drains is not only for JKR roads but also to accommodate the large amount of water that falls from rain and so on in the surrounding areas. Mr Chairman, I also want to raise the matter of development. I want to ask about the development of the four-lane road from Segamat to Tangkak. I only want to ask about the status, because this project has already been officiated, its groundbreaking ceremony performed by a former Prime Minister two years ago, but until now we are still waiting for developments on these roads. Mr Chairman, I also want to refer to...
The Honourable Member for Ledang, the Honourable Member for Ledang.
The Honourable Member for Jasin rises, Honourable Member.
Can it be just one minute? One minute.
One minute, just one minute. Mr Chairman and the Honourable Member for Ledang, thank you. Earlier the Honourable Member for Ledang mentioned the marked difference between roads maintained by highways and ordinary roads. Highways have beautiful roads because PLUS highways impose charges, or we have to pay tolls, but for ordinary roads, all cars and motorcycles are subject to road tax. Is this money collected by the government or handed over to the JKR to maintain roads? Or is it the Honourable Member's proposal, a former person from JKR, a former engineer from JKR. Perhaps we could impose a fee to ensure that all roads other than highways are more beautiful, because we find their maintenance is very weak.
Apart from having JKR, we have regulatory and maintenance agencies. We also have municipal councils, but we still find roads that are damaged and not well maintained. Thank you.
Mr Chairman, thank you, Honourable Member for Jasin. Actually, we are still waiting on what plan is more effective than the JKR's. That is why I raised the matter. This may include the matters raised by the Honourable Member for Jasin just now. Mr Chairman, I would also like to raise a matter that happens often at the grassroots level, namely JKR carrying out projects, no matter what kind of project, especially road projects, including village road projects entrusted by the Ministry of Rural and Regional Development. The problem is that the district JKR and contractors do not even give greetings. Giving greetings means meeting local leaders. At the very least, meet the village head. I want to go in. The contractor wants to build the road and so on. Suddenly the villagers are startled. "This road, which project is this? From where? From JKR...oh, JKR did it!" Because there are roads, Mr Chairman, due to limited allocations, one road may need to be expedited and so on. Mr Chairman, I have already given the signal. I want to move on to one more matter, Mr Chairman, namely that I am raising again the compensation paid to the contractor who built the Jambatan Bengkok project replacing Tambak Johor. I would like to ask about the details of that compensation. How can RM200 million arise? What factors caused this compensation of RM200 million to become so large, and I think there must be complete details of how this RM200 million figure arose? The same matter, Mr Chairman, the Honourable Member for Johor Bahru once raised that a bridge or facility for pedestrians costs only RM5 million. Mr Chairman, RM5 million. This should be the top priority rather than compensation whose figure, in my view, is too large, Mr Chairman. Finally, Mr Chairman, I would also like to raise Item 60700 – Toll Compensation Payment. This year the toll compensation payment is estimated at RM394 million, whereas, Mr Chairman, if we refer to the latest report, PLUS's profit, the profit of the PLUS Express Highway, up to September is RM1.106 billion. So, it seems like a kontra, Mr Chairman. It seems like a kontra. This requires an explanation from JKR so that JKR can provide accurate information to the public. Mr Chairman, that is all. I beg to support.
The Honourable Member for Bagan Serai.
Thank you, Mr Chairman. This time, what I wish to put forward is under 050000 – Management Sector, namely under 050100 – Maintenance Engineering Branch. We find that the maintenance and control of drains along the federal road at Teluk Medan, Sungai Gedong, Kampung Makmor in Kuala Kurau, Kedai Dua, Jalan Banjar in the Parliamentary constituency of Bagan Serai.
We find that the drains around the road just now are indeed overgrown and not cleaned at all. As a result, we find that water does not flow. Under such conditions, it causes flooding and water is constantly stagnant. Please! If we observe, because the water does not flow, it causes flooding or water constantly stagnates in the area, in front of their houses. Thus, I find that poverty is getting worse for these people. What I hope from the authorities concerned is, please clean up those areas, and let us ensure that the water there always flows.
In addition, I also suggest that a guideline be provided for residents on building culverts in those drains so that they do not obstruct any water drainage. What we observe is that not a single guideline is given to the villagers. The villagers do as they please. They want a culvert of two feet or three feet, and they just build it. In other words, when it rains a little, flooding occurs. Then they complain to the Honourable Member asking for help. Besides that, under Item 050700, what is the function of that board that it needs to fill as many as 150 posts? Would it not be better for this function to be entrusted to the State Government through a new arrangement based on the concept of decentralisation? For the second, namely Item 10001, what are the details of the projects that have been implemented or will be privatised, considering the very large financial amount of RM12 million allocated for the year 2010? That is all, thank you.
[Bangun]
The Honourable Member for Lenggong.
Bismillaahir Rahmaanir Rahiim. Thank you, Mr Chairman. I would like to touch on Item 02800 – Repair/Replacement and Upgrading of Roads and Bridges. Recently, the flood problems that hit the whole country were very serious, and most of them also occurred because of problems with bridges and roads that were not very suitable. This also happened in my area in Lenggong, where almost the entire area affected by this flood problem stemmed from the poor condition of the bridges, and in the end, caused more than 4,000 people in the area to face problems. Therefore, I request an explanation and immediate action from the Public Works Department and the Ministry of Works, because this problem has been raised several times at the Development Meeting and has already been included in the upcoming Tenth Malaysia Plan, namely the Kampung Sumpitan bridge, the bridge at Kampung Chain, Kampung Bor, Banggol Belimbing, the bridge near the Kota Tampan public housing, two bridges at Kampung Taman Air, and the bridge at Tasek Raban. All these bridges are in a position that is already highly unsuitable, and we were informed by the Public Works Department that the cost involved is almost RM18 million. I hope this matter is given attention and immediate action by the Ministry of Works, because if the prolonged rain happens again, causing these bridges to fail, the flood problem will not be resolved. Item 61000 – Road Upgrading (New Projects). I would like to inform the House that there is a KKTM construction project under MARA, Ministry of Rural and Regional Development, that is currently under construction. Because this project is large and there is still no road in the area, which at present is only connected by a village road, I request that a road be built from the junction after the Jambatan Raja Nazrin Shah entering Kampung Cherakuh be given consideration and priority. Once this project is completed, of course the use of that road will be very busy, and certainly the existing village road will no longer be suitable for use. Also at the same place, touching on Item 02000 – Traffic Congestion Alleviation Scheme. I also ask the Public Works Department, this matter has actually been reported and I understand it is within the knowledge and action of the JKR at district level, where the need to install traffic lights in this area must take into account future needs and the busy traffic conditions in the area. Therefore, right after the Jambatan Raja Nazrin Shah, the entrance junction to this KTM construction area should be fitted with traffic lights to ensure the safety of users in the area.
This is because traffic accidents often occur due to the absence of traffic lights in the area. Next is Item 89000 – Land Recovery for Road/Bridge Projects and 09290 – Land Compensation Payment. Many areas and lands taken over by the Ministry of Works, whether for development projects or road construction, are in fact not supervised or monitored by the Public Works Department, to the extent that those areas are encroached upon by certain groups and parties. I request that JKR take action near the second Lenggong bridge at Kampung Luat, where the land has been encroached upon by a certain political party that uses it for political purposes. Of course, if this area is encroached upon and continues to be used, it will become a reference point, and certainly other parties will also encroach on any JKR land that is not controlled and managed properly. Therefore, I request that action be taken on this matter. Besides that, regarding Item 91000 – Contractor Course and Advisory Programme, I request that the ministry implement courses, whether for new contractors or Class F contractors who are carrying out duties today, because many development projects implemented by them as implementing contractors do not carry out projects according to the required standards and specifications, and in the end, the projects fail and also cause problems. When problems occur, in the end it will blame the people's representatives again. Therefore, I request that attention be given to Class F contractors so that they truly become contractors who are capable of carrying out all the responsibilities entrusted to them to the best of their ability. This is important for protecting the image of every project implemented. I think that is all I want to say here. Thank you.
The Honourable Member for Kepong.
Mr Chairman, briefly on Item 040000 – Specialist Sector. Here, Mr Chairman, I want to raise it once again because I was helped by the Honourable Member for Pokok Sena, the angkasa tree or the sena tree... [Interjection] That is indeed the angkasa tree, is it not?... [Laughter] It is a little shorter, "Sena," because that looks...
So I raise two matters because the people of Kepong and those who use the MRR2, the footbridge, including the Honourable Member for Pokok Sena, can see there is a net. That net is green, it has nothing to do with PAS, but it is green. I have raised it in this House before because, under this specialist sector, the JKR allowed the use of carbon fibre. This carbon fibre originates from Germany, and Germany is a country with a temperate climate. If it has a temperate climate compared to a tropical country, a hot country like Malaysia with lots of rain. Can this carbon fibre be durable? Perhaps not, because we saw last year there were cracks and three fibres had already fallen from pillar 28. Here I want the government to answer whether this carbon fibre can withstand the tropical climate, especially the current climate change. I do not understand, we have experts here, and within this specialist sector there are various ones, who tell us they want to ensure the effectiveness of technical expertise services as well as technical advisory services in the enhancement of development, design for the implementation of infrastructure and building projects so that they can be carried out perfectly, based on the specifications and standards set, at an economical cost and within the time agreed by the client. Here there is also something strange, when they want to ensure this technical matter, this technical advice and technical expertise can save money, can be implemented well, and I have also looked at Kuala Dipang.
On that bridge, when two or three people jump there, it collapses. So I do not know how this specialist sector, this four-expert programme acting as advisers, how it advises the contractors and so on. Likewise with the stadium in Kuala Terengganu. Fortunately, it collapsed when there was no event...
[Speaking without using the microphone]
Oh, yes. Fortunately there was no programme, because if there had been a programme I would also be afraid there would be severely injured customers. Here we are spending more than RM200 million, the MRR2 also cost more than RM200 million, why is our expertise not sufficient? Perhaps it is related to whether there are open tenders or closed tenders. Previously I saw that tenders do exist, and even if they are opened, they are opened in a closed manner...
Merapu!
What nonsense again? That Kuala Dipang is nonsense going into the river... [Laughter]
Honourable Member for Kepong, may I have your way, Honourable Member?
If you have to talk nonsense like that, it cannot be helped, it is probably best.
Honourable Member for Kuala Krau, please stand, Honourable Member.
Honourable Member for Kepong, may I have your way.
No, there is not enough time.
Within 10 minutes.
Will you give way or not?
Not enough time.
At Kuala Dipang it was not two or three people who jumped, it was more than three people, misleading this House, the facts are not correct, this is nonsense.
He is indeed a bit of a kurau, that is how it is. Perhaps there are many kurau fish in Kuala Krau... [Laughter] Here I hope the Honourable Member can answer correctly how we can resolve this, because even though there is a guarantee, when they carry out projects such as the MRR2 and other projects, there is also a 100-year plan. Indeed, I am also quite happy with 100 years, but two or three years and it is already cracked. So 100 years does not seem to reach that far. If we always have that green net, ordinary people can see how it is, whether it is safe or not. Can we improve the situation so that people cannot see that there is always a net there, for how long will we keep installing nets there? This really frightens people. When they hear about the Kuala Dipang bridge, which is a suspension bridge, they say, how about our bridge then? When they hear about the Kuala Terengganu Stadium, how is that, eh? So I hope the JKR can ensure there is confidence in our expertise in all matters. That is all, thank you.
[Bangun]
[Bangun]
Thank you, Mr Chairman. I would like to touch on Item 08230 regarding Bridge Construction.
In the last session, I received information from the JKR that they would build a bridge at Kampung Nantaduan or Simpangan, which I think the construction of this bridge is very important, especially to facilitate residents and also to make it easier for tourists to come to the Sabah Agricultural Park, where I think the difficulty all this time has been that we have to take a very long route to reach the agricultural park...
[Menyampuk]
Beluran? Mr Chairman, I think the Honourable Chairman's area is also in need of a bridge in the Beluran area. Likewise with 08600 regarding the Road Upgrading Project. I thank the JKR because in the previous Malaysia Plan they built two major roads connecting my Parliamentary area, namely the construction of the Kemabong-Sipitang road and also the construction of the Keningau – Kimanis road. These have given many benefits to us, especially in my area, where both roads have made it easier, particularly for farmers and small planters, to market their agricultural produce. On the Kemabong-Sipitang road, agricultural produce can easily be marketed to the state of Brunei Darussalam. If I am not mistaken, it also reaches Labuan and Lawas. Likewise with the use of the Kimanis-Keningau road, which can further improve the time we take to travel to Kota Kinabalu. However, Mr Chairman, what I wish to put forward here is the problem during the construction of both roads. I see that the condition of those roads is very steep, to the extent that to this day I think many accidents have occurred due to the imbalance of the very steep roads. At one time, I saw that the steepness could endanger especially small vehicles and also heavy vehicles. I would also like to share with Mr Chairman, who has also been to my district and to Keningau, he also complained when Mr Chairman rode a motorcycle. At one point he felt afraid to go down because the road was so steep.
I ask the ministry to look at these problems again so that they do not have a long-term impact, especially on vehicle users. Likewise, I hope these studies can be carried out so that the roads in Sabah are improved, because we see that Sabah's terrain is mountainous. I hope these studies can be carried out so that they can help road users. Lastly, Mr Chairman, Item 11803 – Government Buildings – Repair and Renovation of District/Land Office, Sabah. In our district, in the interior, the administrative building for the Federal Government is currently in the district of Keningau, in the Keningau Parliamentary constituency. What I see is that today this building is very old, and I think it needs upgrading works to provide more effective services to our community, especially in relation to the administration of the Federal Government. I would like to propose to the ministry that, in the future, when it plans and builds government buildings, it looks at and plans so that these buildings can accommodate departments that can be under one roof, which I think could be known as a one-stop centre. As in my area, if residents wish to deal with the Registration Department, they have to travel very far. Likewise, when the public wishes to obtain services from the Education Department, they have to go here and there. So I propose that the ministry look into this matter, and this will help our people, especially our rural community, to obtain the best services from our government. That is all, Mr Chairman, thank you.
[Bangun]
[Bangun]
The Honourable Member for Pokok Sena.
Thank you, Mr Chairman, for giving me the opportunity to also debate B.27 – Ministry of Works. I would like to touch on Item 050200 – Complex Project Management Branch. There are two issues in this matter. Firstly, it relates to the Kuala Terengganu Stadium Complex that collapsed earlier. The issue I want to raise is the extent of the Ministry of Works' role in the construction at the early stage and also in the repair and rehabilitation that will be carried out later. Although I know that previously I did not hear that the ministry had a clear role in construction projects because state government projects were under special funds, namely ex-gratia funds (wang ihsan). This is what caused the wang ihsan, when given to UMNO Barisan Nasional, to be completely collapsed. The stadium collapsed, the mosque also collapsed. This is the result of misuse and embezzlement. The issue, Mr Chairman, is that recently a statement was made by the Minister of Youth and Sports saying that the Cabinet had made a decision to issue a directive for approval that the repair must be expedited. The contractor responsible must be given the responsibility of repairing it and also bearing the cost. The issue I want to raise here is firstly that I have not yet heard, and there has been no disclosure by the government, of a comprehensive study report on the issues that caused the collapse. What was tabled in the Cabinet recently was only the preliminary report of JKR, and I think that preliminary report cannot identify what the real problem was that caused the collapse. So how could the Cabinet make a decision in this matter to the extent of directing that the repair be expedited and carried out by the original contractor involved, when I have been informed that all three contractors involved in the construction of the stadium in Terengganu had no experience, including no experience in space frame technology, which is related to the issue that caused this collapse? So how when... Firstly, we do not have a complete report and I believe that the report from the consultant. Has..., I want to ask, has the ministry or the government itself obtained a complete report from the consulting engineer appointed by the state government, namely a consulting engineer with experience in our country relating to this space frame technology, namely Ove Arup. A consulting engineer named Ove Arup. So this should be the one used because this is a consultant with experience in space frame technology. Therefore I am surprised how the Cabinet could make a decision when there is no complete report? Secondly, that responsibility was also given to a contractor with no work experience. So they were told to do something that, because of their lack of experience, caused the stadium to turn out that way. Because it was not properly examined, the technology to be used ultimately led to the collapse. Then those without experience were given the responsibility of repairing the stadium without a complete report identifying the causes of the collapse. So although I am informed that among the causes is the design issue, similar to MRR2, the problem there was design. So the design problem also has not yet been concretely identified in terms of what the actual design problem was in this space frame technology. I ask for an explanation of how, and what is the role of JKR in advising the government, especially the Cabinet? Do not yet direct repairs; let us first hear the comprehensive Ove Arup report.
Now it seems that the Cabinet made the decision and the Ministry of Works also remained silent and agreed, when this expertise exists. It is the Ministry of Works that was never consulted before in the construction of this stadium. So for that reason I ask for an explanation of how the Ministry of Works views this matter. Secondly, regarding the construction of the MATRADE Convention Centre complex, which I am informed that recently the Honourable Prime Minister directed that on the 17th day of the month an early signing programme be held with Naza TTDI, which is very urgent, carried out by the government. So what I want to raise here are two issues. What is the need for this convention centre project, because I am informed that JKR was given the responsibility to prepare the documents, and the preparation of the documents must all be done by JKR. Although this is a direct negotiation project, which was a decision made at an earlier stage by the Ministry of Finance. However, JKR was only given the instruction to implement it in terms of documents to ensure the letter that I am informed has already been submitted, the letter of intent, and the government's statement of requirements to Naza TTDI have also been stated. But the issue is, can JKR not give advice? Firstly, advice to the government that our country does not need yet another convention centre complex. We already have the Putrajaya International Convention Centre (PICC), for example, which I believe is hardly used in a year, yet its maintenance costs are very high. Likewise, we have The Mines, we have Langkawi and so on. Then we have KLCC. So why do we need another, when the Minister of MITI recently answered that this is a tourist attraction? Surely we would not build a building merely to attract tourists just to see a building, when we spend so enormously, and its maintenance has to be borne by the people's money.
The second issue is why we are giving it to NAZA? Although the government says NAZA offers this building for free, in exchange the government gives a very large piece of land. So, for me, why to NAZA? Why not hold an open tender? Perhaps if we say it is a necessity, perhaps in my view there are other companies that could give a better offer. Not only could a convention centre be built, but perhaps there are other things that could be given to the government and also to the country by obtaining such a large parcel of land. In my view that land could be utilised more widely. Yet it obtains a very handsome price compared with the construction cost of this convention centre of only about RM628 million. Yet it obtains greater profit. If it is RM350 per square foot, if it is RM500 per square foot of land in that area, then of course the handsome profit is just from the land that has been granted to it. So, the issue, Mr Chairman, is why to NAZA? Why not hold an open tender that should allow us to obtain a greater profit? I wish to emphasise that from the perspective of the need for a convention centre, I do not see any reasonable need for us to build yet another convention centre that consumes such a huge expense. Then we are forced to hand over land that is so valuable, precious, in an area with very high land values. Although the government said recently RM72 per square foot, I also cannot accept RM72 per square foot in the Jalan Duta area. So, it is clearly evident that the government does not have a clear plan to look at the whole picture. Then Item 060700 – Toll Compensation Payments. I want to ask here, what is the position regarding the privatisation of the tolls to other companies or whether the government intends to take them over?
[Deputy Speaker (Datuk Dr. Haji Wan Junaidi Tuanku Jaafar) chaired the Committee] Recently an herbal company, Asas Herba, has submitted an offer that is generally seen as giving a good offer to consumers. So, how is the government going to overcome this problem? I am not in agreement with Asas Herba, but if the government agrees to take over, that would be better. If the government wants to privatise, the government should hold an open tender not only to one herbal company, Asas Herba, but to other companies whose offers may be better. Secondly, is there any study to re-evaluate the toll rates? That is, between low-cc cars and high-cc cars. I feel this is not fair. This is not fair. Even a Kancil 850cc has such a toll rate, and a Mercedes or BMW 7 Series has the same toll rate, yet the Kancil has helped the government reduce fuel subsidies. Meanwhile, cars with large cc, they have received more fuel price subsidies because they consume more fuel. So, for me, it is high time for the government to review the position of toll payment costs between small-cc and large-cc cars. Finally, Mr Chairman, P.27 Item 18100 – Workers' Houses/Federal Residential Quarters. In relation to the quarters, government residential houses maintained by JKR. I want to get an explanation, how does the government supervise this in terms of maintenance costs? I want to show an example that at Jalan Bukit Tunku, for instance, there are about ten quarters for officers that are not occupied by anyone. Yet we carry out maintenance; there is security, there is a guard who provides security there, but these are not occupied. Yet the Honourable Prime Minister announced on 6 September 2009 recently, RM28 million allocated to build new JKR quarters. This is for various workers. However, I want to say that we build new ones, then the old ones for senior officers we do not utilise. That is just at Jalan Bukit Tunku. So, I want to get an explanation of how many quarters or residential houses for officers, senior and junior officers, are not occupied, yet we have to bear their maintenance costs; what is the total amount we have had to bear all this time? That is all, thank you.
[Bangun]
The Honourable Member for Serian.
Thank you, Mr Chairman, for giving me the opportunity to debate the Motion of Supply B.27 and P.27 under the Ministry of Works. I refer to Item 09280 – Road Construction. Next, Item 09800 – Highway Construction. Mr Chairman, if we go to Kuching, to Serian, we definitely have to pass through the road called Kuching-Serian Road or Jalan Kuching-Serian. The stretch or section from Kuching to Batu 10 is very good because it is a dual carriageway. Likewise, the stretch from Batu 15, namely Seratau, to Bandar Serian, my area, the road is very good, a dual carriageway, complete with lights.
Is it just as good as what there is in Sarawak, Honourable Member, is it?
Ya?
As good as what there is in Sarawak?
Yes. So, Mr Chairman, what I want to raise in this August House is the section or stretch between Pekan Batu 10 and Kampung Seratau, with permission, to us it is like a bottleneck. The route from Serian to Kuching up to Seratau is quite good, quite fine, because it is a dual carriageway, a two-way route. However, upon reaching the place called Seratau, it is terrible. It is very narrow because there is only one lane. We travel, and that section is only five miles or nine kilometres long. Mr Chairman, my question is, why must this bottleneck occur? I believe the people have complained enough. The people really hope that the stretch between Kampung Seratau, namely Batu 15 to Batu 10, can be widened and improved by building a two-way road or dual carriageway. That is about the Serian Road, the section called the section from Batu 10 to Batu 15. Next, Mr Chairman, Jalan Mentung. Jalan Mentung was built in the early 1970s. Its length is 35 kilometres. This road is used by no fewer than 30 villages. The length of the road is 35 kilometres. 17 kilometres have been tarred. 18 kilometres more have not yet been tarred. Thus, not only during the monsoon season, but even during the dry season it is quite difficult for ordinary vehicles, except four-wheel-drive vehicles, to pass along this road.
So I ask the ministry, please look into this stretch of road, with permission. Because as I mentioned just now, it will benefit not only two or three villages but 30 villages or longhouses. Next, Mr Chairman, Jalan Mapu-Terbat, this is also a very funny case, with permission. Jalan Mapu-Terbat is only 7 kilometres long. What happens, Mr Chairman, is that from the town or market of Tebakang to Kampung Bunan. The road is 23 kilometres long, the road has been tarred very well, but the stretch called Jalan Mapu-Terbat is only 7 kilometres and is very bad. During the monsoon season, no vehicle can pass, including four-wheel-drive vehicles, but at the far end, the part called, the road called Daha, is 5 kilometres long and resembles a highway, so this is what is strange, Mr Chairman. Go to Daha Kisau, the road is good up to Bunan, the Terbat Muara Ahi junction, after that the stretch is only 7 kilometres long, very bad, no vehicle can pass, including four-wheel-drive vehicles, during the monsoon season, but at the end of that road for 5 kilometres, as I mentioned just now, it resembles a highway. Honourable Deputy Minister, please look into this seriously. And finally, Mr Chairman, I want to bring to this August House the condition of bridges. I believe that although it may fall under the jurisdiction of the Ministry of Rural and Regional Development, because most of these bridges are is already most of it in lapidated condition, with permission, I ask the ministry to look at the condition of rural bridges, especially in the Serian Parliamentary constituency, so that bridges that are almost on the verge of collapse can be replaced with bridges, especially concrete bridges. With that, Mr Chairman, that is all, I support.
[Bangun]
The Honourable Member for Klang.
Thank you, Mr Chairman, and the Honourable Minister, if present in Parliament. I want to raise two issues. The first issue is under Item 31000, this concerns the construction of new bridges and roads.
Specifically, I would like to raise the delay in building the Third Klang Bridge, or Third Klang Bridge. This project was approved by the Economic Planning Unit on 7 January 2008 with an estimated cost of RM10 million, and the Minister of Public Works (JKR) at that time officially launched the construction of this bridge a few days before the general election last year, but until today there has been no construction since the launch by the Honourable Minister last year. My questions are, when will construction of the Third Klang Bridge resume and why has construction been postponed until now. The next question is why the allocation under the RM67 billion Economic Stimulus Package, namely the first and second economic packages, has not been used to start construction of this bridge. The second issue relates to Item 010000, which concerns the management of the Ministry of Works (Kementerian Kerja Raya), and the issue I wish to raise is the report on the landslide at Bukit Antarabangsa. My question is why this report is still under the Akta Rahsia Rasmi or OSA, and when the government intends to classify this report in the interest and safety of the people. There is speculation among the public and also in the local media that the government does not wish, I repeat does not wish, to classify this landslide report at Bukit Antarabangsa, in order to protect certain water companies and water contractors. I hope the Honourable Minister will give an explanation on this matter. Newspaper reports state that the critical factors that caused the collapse at Bukit Antarabangsa were leaking water pipes and active pipelines in abandoned houses which increased the water content in the soil in the slope area concerned. My question is, will the government, including the National Water Services Commission (SPAN), take legal action against the firms that are directly or indirectly responsible for the deaths of four Malaysians and property damage estimated at millions of ringgit? Thank you.
[Bangun]
The Honourable Member for Jempol.
Thank you Mr Chairman. Purpose P.27 Ministry of Works (Kementerian Kerja Raya), Item 61000 - Upgrading of Roads (New Projects). I extend my thanks to the government which has completed the construction of the Bukit Putus Road, which has connected East Negeri Sembilan with West Negeri Sembilan well. However, when this road is used, there is severe congestion in the Terachi area. Although cars can travel smoothly on Bukit Putus, as soon as they pass the original old road, one lane in Kampung Terachi has caused congestion all the way to Jempol. I propose to the government that the road from Terachi be upgraded to four lanes all the way to Bandar Seri Jempol, because those who use this route are some of the residents of Pahang, namely the Karak area, some from Kuantan and some from Gemas, going straight to Segamat. So if the government can develop this four-lane road all the way to Bandar Seri Jempol, the volume of vehicles can be divided into three sections and this will certainly help to further boost the economy in the East Negeri Sembilan area. Apart from that, there is a very beautiful location at the summit of the Bukit Putus route. I also propose that the government allocate part of this funding to build an R&R with rest facilities, restaurants and places where people can view the beauty of Bukit Putus, where one can see a very beautiful phenomenon at the summit, and this will also provide facilities for the tourism sector.
Apart from that, I noticed that for the first time I received a report of tremors in Kuala Pilah. Previously I had never heard of Negeri Sembilan being affected by volcanic tremors and the like, but a concern has arisen in my heart because one of the bridges built on the new Bukit Putus route is among the highest bridges in Southeast Asia. So, it is very high. I do not know the condition of the pillars on this new bridge.
If possible, please carry out monitoring now as well, so that a report can be given when the Minister replies later, because that is the route used by the Member of Parliament for Jempol to travel back and forth. I am worried that a by-election may occur if such an undesirable thing happens. Mr Chairman, I have come to see how important it is for JKR to upgrade the roads in FELDA areas. In the past, not many people in FELDA owned or were able to afford cars, but when the prices of rubber and palm oil commodities soared and the government's success in providing good guarantees to the FELDA settler community, I have seen the ability of the FELDA settler community to buy cars. Moreover, their children are very clever and intelligent. Some have become professionals who certainly have the means to buy cars, and today we can see very severe congestion. JKR roads in the FELDA clusters. I am confident and believe that if this study can be carried out and this allocation can be given, it will solve the problem, especially on the road involving FELDA Pasir Besar to Keratong Highway, and from Keratong Highway to the FELDA Hilir cluster, which are locations with very severe congestion. Mr Chairman, I would also like to touch on Item 060700 – Toll Compensation Payments. I am also puzzled to see that when travelling on the highway from the South to the North up to Kuala Lumpur, there are Toll-Free Zones. In Ipoh there is also a Toll-Free Zone. In Penang there is also a Toll-Free Zone. However, when reaching Seremban, it is neglected. There is no Toll-Free Zone. This therefore limits our efforts to develop Seremban more rapidly because it involves costs, and the people do not have freedom to use the area because every route they take they have to pay tolls. Therefore, I would like to get an explanation as to why Seremban has been treated this way? Mr Chairman, I also see that the North-South Expressway is getting more crowded. Every lane, even after the government upgraded it to three lanes on the left and three lanes on the right, is full, especially at weekends, because the current tendency of our people is to like going back to the kampung. They visit their families and spend time with their families in the kampung. Moreover, during festive seasons such as Hari Raya Aidilfitri, Aidiladha, and so on, the congestion becomes even more severe, to the extent that there is no room for us to see cars to pass. So I think it is time for the government to consider how to overcome this problem. If it is not possible to build four more lanes, I think perhaps it is difficult, or the government could consider adding another layer. On top of this highway, build another new highway layer with tolls. So those who can afford it can use this upper layer, and with a somewhat higher fee they can pass, but they will not encounter the severe traffic jams like the route below. The Honourable Minister should think about this with wise officers. I am only making a suggestion, but the people's complaints are very heavy right now that this highway needs a new way of thinking to overcome this congestion. Mr Chairman, Item 02000 – Traffic Congestion Relief Scheme. Bandar Bahau is among the locations visited by the 35 FELDA Settlement Schemes, which have a monthly income of not less than RM40 million. They spend in Bandar Bahau, and Bandar Bahau is now jammed. Moreover, part of the traffic of large lorries enters Bahau town because there is no alternative. They are forced to pass even though it is congested, they have to pass anyway.
I would like to ask the ministry for an explanation as to where the Bahau Bypass money went. In the past I saw that in previous Malaysia Plans there was an allocation for building the Bahau Bypass. So if this money can be found again, perhaps it can be given under this allocation. Build the Bahau Bypass, so that some vehicles do not need to enter Bahau town. They can be diverted to other locations to continue their journey without adding to the congestion in Bahau town. I also ask for an explanation from the Honourable Minister regarding 21000 – Construction of Grade-Separated Interchanges (New Projects). I thank the ministry for building the grade-separated interchange from the Port Dickson route to Rasah and in front of Tunku Jaafar Hospital. However, after Tunku Jaafar Hospital, it only goes as far as there. Yet if it were extended a little further, to the front of KGV Secondary School, this route could be split into two. Some could enter Seremban, and some could go to Jelebu and Jempol. Only then can we separate the traffic. However, because it stops in front of Tuanku Jaafar Hospital, it causes very severe congestion in that area. This is a loss. Only a few routes that can be connected through this Grade-Separated Interchange Programme can solve the problem, but when the ministry, through JKR, does not implement it, it has caused difficulties for the people. Mr Chairman, I would also like to touch on Item 11800 – Repair and Renovation of District/Land Offices. In the state capital of Seremban there is the Negeri Wisma Complex to house Negeri Sembilan departments. Next to it is the Wisma Persekutuan. This Wisma Persekutuan is very old, and now, because we have a large number of federal employees, it is unable to meet the needs of our staff. What is the harm in using part of this allocation for renovations to add comfort for our officers at Wisma Persekutuan Seremban, Negeri Sembilan, in order to further improve the performance of our officers in the future. Finally, Mr Chairman, regarding 040100 – Architecture Branch. I see a very great loss to the country in terms of tourism, because some of these tourists come to our country to look at building design architecture. Malaysia has a foundation of architecture or building design of states that have their own distinct identity. However, I see that the large allocation to build large buildings in our country cannot be used as well as possible by translating this beautiful architecture into the design of the building. In the end our buildings are not beautiful either. Even in Kuala Lumpur the buildings are not beautiful. In my kampung, too, it is not beautiful when they build a big hospital without the identity of Negeri Sembilan, with no curved roofs, which tourists cannot see at all. This is a loss. So if this continues in the future, I would remind that in terms of design we will suffer losses not only in terms of construction but also to the tourism sector, which is a very large source of revenue for our country. Thank you very much, Mr Chairman.
[Bangun]
The Honourable Member for Pasir Mas.
Thank you Mr Chairman. I refer to B.27, 00600 – New Roads. I would like to ask about a project named Pasir Mas Bypass Phase 1, for which, if I am not mistaken, the contract was awarded three years ago, and it still has not been implemented.
This project, if I am not mistaken, is 5 kilometres long and was offered to Citra Bina Sdn Bhd at a value of RM29 million through a build and design tender. I understand this company tried to sell this project to several companies by placing a very high commission, so that until now it has not been implemented. I also want to ask whether the practice of build and design tenders still continues. This is because build and design tenders, Mr Chairman, are wasteful, especially they oppress contractors, as they have to do the design, they use consultants, architects, QS and the like, and only one company gets it, while they spend a great deal of money paying consultants to take part in this build and design tender. Is this concept still practised, and has it been found to be a wasteful approach that does not benefit contractors, whether bumiputera or not, but still uses this build and design tender concept? Mr Chairman, I would also like to refer to Item 02800 – Repair/Replacement and Upgrading of Roads and Bridges. Firstly, I would like to ask about the progress of the four-lane upgrading project of the Sultan Yahya Petra Bridge in Kelantan, where previously a company was offered to implement this project, and I understand it was sold to Red Land. I heard Red Land then sold this project to another company. I understand it is based in Sarawak. Is it true or not? I would like to ask for confirmation. I see this project is being implemented, but I would like to ask how much the cost is. Has the cost increased? This is because those who got this project earlier, I observe, perhaps they have become well-off, perhaps they have already received commissions, but the project is not completed, and has the government borne higher costs in implementing this project? This includes not only the four lanes but also the bypass all the way to KB Mall, which is the main road in Kota Bharu. So I would like to ask about the status and detailed information relating to this bridge, because it has become a complaint of the people of Kelantan and it also involves the credibility of the implementing agency, because of the many bad stories that have been spread. Therefore, I hope this matter can be explained. Secondly, under the same heading and item, the Pasir Mas-Salor Bridge. I would like to ask, previously I made a proposal that this bridge be upgraded to four lanes, including providing a bypass or flyover to relieve congestion, and in the answer during the last session, the previous Minister of Works replied that this project would be implemented in the Tenth Malaysia Plan. So I would like to know whether it is really included in the Tenth Malaysia Plan to upgrade the Pasir Mas-Salor bridge to four lanes, including the flyover I mentioned just now, all the way to Bandar Baru Pasir Mas, so that it can help overcome traffic. Furthermore, I would also like to ask under the same item, when will the road from Tanah Merah to Bulatan Lemang in Pasir Mas be upgraded to four lanes? I understand the federal road has already been upgraded, and what I know now is that the highway has already started from Gerik to Tanah Merah, but from Tanah Merah to Pasir Mas it is still the old road, and it has become congested and dangerous, and I have seen many accidents happening there all this time. So, will it be upgraded to four lanes, and when will it be implemented? Likewise, the road from Bulatan Lemang to Bandar Pasir Mas and onward to Bulatan Pasir Pekan in Tumpat, which should also have been implemented as a four-lane road long ago. Mr Chairman, I would next like to refer to Item 70000 - Road Beautification Projects. I would like to ask the ministry, I have received information that federal roads and our highways use tar or bitumen at an off-spec level, namely a low quality standard and not of the quality claimed to meet the quality standard imported from Singapore.
Is this true? This matter could cause accidents and high maintenance costs, and it uses a considerable amount of the people's money. The use of this type of bitumen was practised in the era of the former Minister of Works, Dato' Samy Vellu. All sorts of allegations and claims have arisen that those who used this bitumen had links with certain parties, including a former Minister. Is it true or not? If it is true, I ask that it be investigated, because it involves considerable costs. Is this the real cause of road accidents, because the tar or bitumen I mentioned just now does not meet the standard that should be used in road construction? I ask that this matter be investigated. Apart from that, Mr Chairman, I also want to refer to Item 09230 – Bridges. I want to ask, who is responsible at the Public Works Department (JKR)? If in the city I see flyovers or bridges that have become dirty. All sorts of posters are pasted up, all sorts of pictures, especially advertisements for selling medicine, "this medicine, that medicine." Under the bridges and at the junctions. I also see that these do not give beauty in terms of the environment, and I hope the JKR will tackle this matter, or look at it from the angle of law or enforcement, so that all these places are ensured free of posters like these. Likewise, as I said just now about the posters on these roads, Mr Chairman, the road surfaces also need to be made properly, because not only lorries, cars and motorcycles pass over them, but now people are even pasting pictures on the road surface, as at the DAP Perak Convention yesterday. At the entrance of the DAP Perak Convention Hall, I saw in The Star today on page 8, in Sinar Harian on the front page, and in Malaysia Insiders, that among DAP leaders there were those who stepped on pictures of representatives who had switched parties, namely the Honourable Kapten Jamal and the Honourable Kapten Osman, which I consider a very rude, impolite and irresponsible act. Where is the principle of human rights that has always been talked about? Mr Chairman, that is all I wish to say. And finally, B.27 – JKR Management. Item 010300. I want to ask, in the reply of the Minister of Works to me on 9 November, Monday last, there was an answer from me asking about the implementation of Projects of the Ninth Malaysia Plan in Kelantan, which total 28 projects entrusted to the JKR under P.27, and I received the answer that ten projects have been completed. Seven projects are under construction, one project is in procurement, and the remaining ten projects that have not yet been implemented are now at the preliminary stage, such as design implementation and land acquisition. So for these ten, seven under construction, one project at the construction stage, and the ten that have not yet been implemented, which I referred to just now, I ask for detailed information. What are the projects? What is the total amount? Where are they? If there is no time to answer now, Mr Chairman, I specifically ask for a written reply. That is all, Mr Chairman, thank you.
Yes, the Honourable Member for Putatan.
Thank you, Mr Chairman, for allowing me to also debate the Ministry of Works in relation to the Development purpose, P.27. I want to touch on matters related to the state of Sabah.
As time does not permit, starting from Item 08200 – Grade-Separated Junction Projects, 08230 – Construction of Bridges (New Projects), 08250 – Study on Slope Protection/Repair, 08260 – Upgrading and Rehabilitation of Roads (New Projects), 08270 – Rehabilitation of Roads, 08500 – Road Safety Projects, 08600 – Road Upgrading Projects, and 08800 – Construction of Roads (II). I have grouped all these items together with matters such as the allocations provided in this estimates book, which total RM185,810,160. If we look at it, Mr Chairman, it is really pitiful.
The allocation for the state of Sabah is only RM185 million. How large its area is, yet the road projects in the state of Sabah have not been well maintained. If this is the allocation given, then the people of Sabah will be crying, Mr Chairman. The largest allocation within this allocation consists of Item 08260, namely Upgrading and Rehabilitation of Roads, amounting to RM100 million. Many roads need to be repaired and many more roads need to be built, Mr Chairman. Among the items I mentioned earlier, first, bridges need to be built in the state of Sabah. Collapsed roads need to be repaired. Is this allocation sufficient? Certainly not. Certainly not. I touch on the roads in my constituency, Mr Chairman, which were not built and designed by the builder, but designed and built by the contractor who implemented the road project between Jalan Kepayan and the Sungai Petagas Bridge. Unfortunately, Mr Chairman, the widening of the Petagas Bridge road was obstructed because the contractor could not continue the project as compensation to the houses involved was paid only up to RM50,000 per house. This is believed to be a decision of the Sabah State Government Cabinet. As this project is under design and build, why were these compensation prices not given due consideration? Why was this project approved without giving adequate reward or compensation to the people involved? So this has resulted in delays in the implementation of the road, and until now it has not been able to proceed. Honourable Minister, there is a proposal that I have listed, namely that some alternative roads not pass through... The answer last week regarding the Pan Borneo Highway. What the Honourable Minister answered was, when will the Pan Borneo be implemented? However, the Honourable Minister touched on the road to Pita, Kalabakan and Sandakan. What I meant at that time was the connection between the state capital of Sabah, Kota Kinabalu, to Brunei Darussalam and then onward to Kuching. That, I understand, is what the Pan Borneo means. So that answer was unsatisfactory. I hope the Minister can correct this statement if I am mistaken. The Pan Borneo does not mean the road to Kalabakan, Tawau or Kudat. So, what I touched on is the alternative road, Honourable Minister, because traffic congestion now occurs in front of the Kota Kinabalu Airport. During peak hours, if I may say so, that is where the traffic jams are. That is where people curse and get angry with the government. Why has this not been implemented? Meanwhile, I have already raised this matter several times in this august House, that the widening of that road should continue from Sungai Petagas or near the bypass interchange near the KKIA, which is the Kota Kinabalu International Airport, if I may say so, and continue to Taman Sabindo, then to Kem Lok Kawi. That is where the congestion through the town of Putatan occurs. Several kilometres, Honourable Minister. I hope the Honourable Minister can take this matter seriously, or if possible, provide sufficient allocation for the alternative road, namely what I understand about the old road from Donggongan or Penampang to Papar, this project has already been awarded, if I may say so, to several contractors. I have heard, but it has not yet been implemented. This is an allocation that has been provided under the Ninth Malaysia Plan. When will this project begin? I hear the award has also been offered to several contractors, but there is no sign of implementation yet. This RMK-9 period is nearly over, but it still has not appeared, Honourable Minister. Another road I mentioned earlier is the alternative road from the coastal road of Tanjung Aru. The Tanjung Aru hotel area beside the airport goes straight to Jalan Sabindo via the sea. That is one alternative road to avoid traffic congestion in front of the Kota Kinabalu Airport.
I hope that the items I have listed and proposed to be implemented in this RMK-10 period can be given sufficient allocation by the ministry so that this can ease the road users who use this road to Papar, Beaufort, Sindumin, Sarawak, Setampin from Kota Kinabalu. I hope this can be implemented, Honourable Minister. One more matter: the collapsed road that crosses from Jalan Kampung Duvanzon to Kampung Kadazun and Penampang collapsed in April 2008. Several times posters were displayed shouting that the representatives were asleep, not wanting to do anything about the collapsed road. It was closed by the JKR because it could not be passed, for the sake of the safety of road users. However, I was stubborn, and I placed half a brick at the side of the road so that villagers could pass along it.
Otherwise, road users would have to use several kilometres, about 10 kilometres in total, to reach their destinations, yes. So I used a small allocation to place the stones so that small cars could pass. Until now we have pressed the JKR, but the answer was like this: "a soil study was carried out in mid-2008," and I asked again earlier this year. "The soil study is not yet complete." I understand that a contractor has already been offered, but the contractor offered could not carry out the repair of the collapsed road because the BQ was insufficient. So I hope the ministry can look at this matter. Although this road may be under the jurisdiction of the state government, I hope the Federal Government can look at this matter, because it is related to our people, and it is the Malaysian government that is blamed, as well as the Barisan Nasional representatives... [Laughter] The opposition does not matter, because they do not make noise; the opposition is only clever at... [Uproar in the House] twisting matters and blaming the government so as to gain votes from the words of the opposition, which go round and round...
[Speaking without using the loudspeaker]
So I hope the Minister... [Uproar in the House] That is the opposition, they know. I hope the Minister can look at this matter seriously before the opposition takes the opportunity to confuse the people. Thank you.
Yes, the Honourable Member for Telok Kemang.
Thank you, Mr Chairman...
Those who have talked a lot while seated need not talk much any more.
Mr Chairman, I mean Items 81000, 60000 and 61000 concerning the Construction of New Roads, Upgrading of Roads and Routes, as well as Upgrading of Roads (New Projects). I will raise again the matter of the construction of the new road, namely the Seremban–Port Dickson Highway, whose direct negotiation for this project was implemented on a design and build basis in 2003. It should have been completed two years ago, but the period was extended, and the new period given was up to December 2009. However, so far only 66 per cent has been completed, and I have been informed that the ministry has already issued a notice to terminate the contract. I have also been informed that the contractor has appealed and the ministry is considering the appeal, but the decision has not yet been communicated. I ask the ministry to provide an explanation regarding the status of this project, because this project has been stalled for so long and has even resulted in deaths because safety aspects were not taken seriously.
I hope the ministry can provide further explanation, because this is related to two highways nearby. Must there be a by-election in Linggi before this road is continued? I also bring up Item 060500 concerning the JKR Training Allocation of RM8,000,000. This means an expenditure of at least RM650,000 a month. I ask the ministry to explain what form of training will be carried out that requires such a large expenditure. Will this training improve the work performance of workers, or the competence and performance of JKR staff? I also raise the matter of Workers' Quarters/Federal Residential Houses, 18100, whose allocation is only RM17 million. I only want to know the ministry's plan to build more workers' quarters, because what exists now are houses that were built a long time ago and have only one room. This is the concept of government housing that was made 20 to 30 years ago. So I ask for an explanation. I also want to raise the matter of Item 40000 – Fixed Grants and Charges, which has been raised regarding Toll Compensation Payments. An amount of RM394,000,000, but is this related to the reduction of the allocation for development, from 2008, in 2009 by 40 per cent was reduced. In 2010, another 20 per cent was reduced. What is the burden of paying this toll compensation? According to the PLUS Report, in 2008 an amount of RM731 million was received from PLUS from the government. According to this report, RM190 million in 2009 and an allocation of RM396 million in 2010. Is this compensation causing the development allocation to the Ministry of Works to decrease every year? There is also an allocation regarding training experts, namely an increase from 2009 from RM87 million to RM95.7 million, which is Item 040000. For this expert sector, can it help the ministry to provide the experts needed, especially for projects that are being and will be implemented, because recently many things have happened, perhaps due to negligence. I am not accusing the ministry; perhaps this is due to reasons caused by the contractors responsible for carrying out the works. For example, in the landslide project at Bukit Antarabangsa, one of the causes was the lack of maintenance and damage to the drainage system in the area, slope failure and the surrounding area.
This may be the negligence of the developer in carrying out the works as required in the approval by the relevant authority. However, it is the responsibility of the ministry to ensure that such conditions are followed and complied with, so that what happened will not be repeated in future. Under Item 050700 – JKR South Kelantan Development Authority (KESEDAR). This results in expenditure requiring 150 posts. So I do not understand, can the ministry please explain? Why is it necessary to have so many staff in this authority who only monitor or carry out duties in one state in Kelantan? Why is this not centralised, if I may say so, to the state concerned? Next, Item 31000 – Construction of Roads and Bridges (New Projects) and also Item 60000 – Upgrading of Roads and Routes. Once again I request that the ministry consider the exit slip road from the North–South Expressway leading into Seremban from Senawang, which until today remains, even though the highway has been upgraded, but the old toll booths only have two tolls for one route. This causes congestion every morning and evening, and I ask that the ministry take appropriate action as necessary to avoid the problems that arise for those who will exit to the Seremban–Port Dickson Highway. Finally, Mr Chairman, concerning... That is all I can convey this time. Thank you.
Yes, the Honourable Member for Lipis.
Thank you, Mr Chairman. For the Supply and Development Purposes 27 – Ministry of Works (KKR). Firstly, I want to touch on Item 010100 – KKR Top Management. I seek an explanation from the ministry. What is meant by KKR top management? I see that in the supply purposes of other ministries there is no item for top management for the other ministries. Only this ministry has it, so I seek an explanation on this matter. Secondly, Item 030600 – Education and Higher Education Works Branch. If we look at the Ninth Malaysia Plan, it is nearing its end. Next year is the final year, after which comes the Tenth Malaysia Plan. I seek an explanation from the ministry: how many secondary schools and primary schools were able to be built during these four years of the plan? How many projects were completed ahead of schedule? How many school projects were built according to schedule? How many projects were not on schedule, were left behind, and were sick projects, and why did these situations occur? Next is Item 060500 – JKR Training Allocation. Here too I seek an explanation: where are the training sessions conducted? What is the connection between this training programme and IKRAM, which I see was formerly a branch of the Ministry of Works? What is its connection with a university called Kolej Universiti Infrastruktur Malaysia? I think the national one in Bangi, the two of them sit side by side. Is it part of this ministry or is it separate? How might the training be privatised or outsourced to IKRAM and so on? I say this because I believe IKRAM was given by the government for one purpose, namely as a training centre for staff or officers, especially in the Public Works Department (JKR) or in the Ministry of Works itself, in addition to other staff related to the fields of engineering and technical work. Next is Item 00600 – New Roads, and I also include Item 00700 – Construction of Other Federal Roads and Bridges. Firstly, I want to draw attention to Federal Route 8 from Bentong to Kuala Krai via Raub, Kuala Lipis, Gua Musang, until Kuala Krai. This road from Bentong to Kuala Lipis has been widened, but from Kuala Lipis to Gua Musang the road is still very bad, where there is no road shoulder, and this sometimes causes accidents and so on. Although there is now repair work worth RM80 million that has been allocated to repair the road on Federal Route 8 from Kampung Relong, Kuala Lipis to Gua Musang, I see it is very small, and I do not know which phase the places being repaired and started are in. Work was done at places with many logging trucks. Perhaps because logging trucks can bring income to contractors, and so, they prioritise those places. However, places that should be repaired, such as the uphill and downhill sections, have not been touched at all. These dangerous places. Work is done in easy places that are not necessary. So I seek an explanation from the ministry: how far can this road on Federal Route 8 be built further, especially in that area? Likewise, during festive seasons, the road becomes congested because of the town routes of Bentong and Raub. These are two towns that cannot be avoided so far. Just yesterday I myself, who usually takes two hours from Kuala Lipis to Kuala Lumpur, took more than four hours to return to Kuala Lumpur because of congestion on this road. I was stuck in Bentong town and also in Raub town. So, the announcement made by the Honourable Prime Minister through his earlier budget said that roads would be built. Will it follow the same route, or will a new alignment be made for this road?
Likewise, I want to mention the Route 64 road from Benta to Raub, which has been allocated RM50 million, but until now I do not see the works... I was informed in this House that RM50 million was allocated, but until now I do not see any work to repair the road. So I seek an explanation on this matter. Likewise with Federal Route 8, apart from that, the slopes that have not yet been rehabilitated between Benta and Kuala Lipis are very dangerous. Each time I pass there, I look up at the hill and wonder when these landslides will crash into the cars passing by.
So, here I seek an explanation: when will the slope on Route 8 be repaired? Apart from that, I also request that the government and the ministry consider building a bridge. If possible, in Mukim Jengka 1, Kuala Lipis, across the Jelai River, because along the 80 km from Kuala Lipis to Raub via the alternative route of Kuala Lipis, Kerambit, Tembeling and Jerantut, there is not a single bridge crossing the river, and as a result, development on the other side of the Jelai River cannot be carried out. I once applied to KKLW and discussed with KKLW officers, and they said that because the cost of the bridge is high, it may be better to apply to other ministries. So, I request that the Ministry of Works consider a bridge, ideally at Kampung 'Gemenchur', in the middle there, to ensure there is a bridge for the residents and anyone who passes along that road, and they can use the bridge at Kampung 'Gemenchur'. Next is 18100 – Workers' Housing/Federal Residential Houses. In Lipis, Mr Chairman, there are many old houses because it was the former state capital of Pahang. There are many houses, and I believe these houses should be repaired, and some cannot be repaired anymore. However, in my view, if these houses can be maintained and repaired, the housing problem for officers who come to serve in Lipis or who wish to transfer to Lipis would not be a problem. So, currently, because housing is very limited in Lipis and prices are very high, some government officers, when asked to transfer to Lipis, refuse because there is no house. However, if these government houses are repaired, it would enable these officers to live comfortably in the existing government houses. Next is 11800 – Repair and Renovation of District/Land Office. In my view, in Lipis the District and Land Office is an old state secretary's office building that was abandoned and became the district and land office. Until now, there is no shared building or new district land office built in Lipis. So, I once saw that land had been cleared at Bandar Baru Kuala Lipis that was said to be for a new land office, but until now only the site has been completed. They said it was already in the Ninth Malaysia Plan, but until now, even at the end, there is nothing yet. I seek an explanation on this matter. The next is 91000 – Contractor Course and Advisory Services Programme. This is important in my view for the ministry to give serious attention to this matter, because, in my opinion, many of our contractors in Classes 'F', 'E', 'D', 'C', 'B', 'A', particularly many from Class 'F', should be upgraded and given attention, given courses so that they can move up. If there are contractors in Class 'F' who really do not want to move up.
This is not under JKR, Honourable Member, this PKK.
This PKK is under JKR.
Under JKR?
Yes, it has already been transferred.
I thought it was under that ministry, Entrepreneur Development.
That entrepreneur one has been transferred.
Please, Honourable Member.
So, what I mean is, I say this because there are too many projects in Class 'F', which causes them not to want to move out of Class 'F'. If possible, increase opportunities for Class 'E', 'D' and so on so that they can be upgraded. So, they remain there because of opportunities. When I asked why they do not upgrade from Class 'E' and so on, they said the number of projects is not enough, there are none. Sometimes they do not get even one in a year. Yet some in Class 'F' regret, after being upgraded, now wanting to move down a class and so on. So, I hope this will be given attention so that there is a process of building these contractors, and not just placing them there. We should also give attention to contractors...
One minute left, Honourable Member.
Yes. Causing their projects to be affected. I was shocked when I heard that they are subcontracting. When they subcontract to foreigners, foreigners from Indonesia become the contractors. They get projects and give them to these Indonesian foreigners. I was also shocked. I hope the ministry will give attention to this matter so that it does not happen, because the purpose of establishing Class F, in my view, is as a class for our contractors to learn, and after that they move up to other classes.
That is all, Honourable Member.
Finally, I want to look at Jalan Lojing, this is the last one, namely the Simpang Pulai–Lojing–Gua Musang–Kuala Berang road. In my view, from Simpang Pulai to Gua Musang has been completed, but from Gua Musang to Kuala Berang some parts are not completed and are cut off. I hope this road can be expedited because it can shorten the route for residents from Kuala Lumpur to Kuala Terengganu and so on. In my view, it can also boost the economy and so on. So, that is all, I support. Thank you.
[Bangun]
Yes, Honourable Jerai.
Thank you, Mr Chairman, and thank you to the Ministry of Works. I refer to Item 60000 – Road and Route Upgrading, 61000 – Road Upgrading (New Projects), 70000 – Road Beautification Projects and 08500 – Road Safety Projects. Mr Chairman, as is well known, federal roads in the Jerai Parliamentary constituency run from Bidung to Kota Sarang Semut, which is the main road since Kedah was formed. What is disappointing to users is that these roads are rarely repaired. So I request the company Belati Wangsa and the ministry to... How much is the cost for 1 km? This is because the roads are getting worse by the day. It causes accidents and so on. Next, I refer to the highway built by the company Iswada Sdn. Bhd., namely the road from Pekan Gurun to Jeniang. I have already spoken several times to that company and together with the contractor went to the site. The first issue is the U-turn that has not been opened to this day.
This causes village folk to have to open their own routes, which has a very dangerous effect on users and also on the safety of children crossing to school. Second, the slope is quite steep because this highway is higher than the roofs of the village houses. Apart from floods and so on, the slope is very steep, so I request the ministry to review it and take immediate action to facilitate entry and exit for villagers around the highway route, namely from Jeniang to Gurun. Next, also in front of Perwaja Steel, the Perwaja factory, yesterday there was another accident. The highway built connecting to Gurun–Jeniang, first of all the issue is the U-turn that was built, which is quite dangerous for those users because the junction is rather confusing, especially for drivers who are newly passing through the area. Of course accidents will happen. This includes the street lights that are absent at night, dark, which has a bad effect on drivers.
Next, Item 060700 – Toll Compensation Payments. This is also a toll matter: when we use it, we certainly need comfort and so on. Just now I came from Kedah. When I reached Jelapang, I found that barriers had been erected for new construction. Imagine today, the first day back at work after the Hari Raya Adha holiday, so we request PLUS and the ministry's cooperation that if construction is to be carried out, they should look at public holidays or days that are not congested, so that prolonged congestion on the highway does not occur. This causes delays and so on. So we request the ministry to review tolls from time to time, not increasing but decreasing, looking at current needs and the people who have to bear very high costs. So finally, I request the ministry to expedite and review roads that are slow to act in restoring them, especially the main roads throughout the Jerai Parliamentary constituency, so that allocations are speeded up and can be used well. Because my area is a padi field area, within six or seven months cracks and so on will occur. The factor is the soil. So I request the Ministry of Works to monitor this process quickly so that it can provide convenience to highway users. Thank you, Mr Chairman.
Yes, Honourable Limbang.
Thank you, Mr Chairman. I want to touch on Item 050100, namely the Maintenance Engineering Branch. While we wait for what was announced by the Minister of Works the other day regarding widening the Federal Road, the main route one from Long Sematan to Lawas, there are still many Federal Roads at present that require maintenance, especially in the Miri–Bintulu area and also from Bintulu to Sibu. Many road surfaces at present are in a bad condition and very dangerous for vehicles, and I feel the government should allocate funds and ensure that the road maintenance concessionaires do their work as well as possible. Likewise, specifically for my own area, I very much hope the government has reached the point of resurfacing the Federal Road in the Limbang district, namely from Pekan Limbang to the Brunei border, a distance of 42 kilometres. There at present, the road already has many, with permission, depressions that need or must be levelled, because it is dangerous for vehicles, and the surface itself has begun to crack because the premix is already old and must be re-laid.
In addition, the road from Pekan Limbang towards Temburong, a distance of 14 kilometres, is likewise, because at present that road is winding, an old road, but it has been taken over by the federal government to become a Federal Road. [Mr Speaker presides over the Committee] It also, from its original state, with permission, has an undulating surface, and it is hoped that the government through the concession can level this road surface, but not along the whole road, only at certain stretches along the 14 kilometres. For this road of 56 kilometres from border to border, there are many other things such as road lines that have faded, depressions here and there, and many signboards that are damaged and missing and need additions to make it easy for road users, especially newcomers. In addition, apart from the road itself, the slopes along the Federal Road in the Limbang area, especially the slope at kilometre eleven on the road to Brunei, have for a long time, from 2005 until now, not yet been repaired. I know there has been temporary repair, but it requires a more detailed study. I also found that the government has indeed appointed a Public Works Institute to conduct and carry out studies, but I feel this is rather slow. If possible, please expedite this study, because accidents have already happened at kilometre 11, many times. I also want to touch on Items 00700 and 31000, namely Construction of Other Federal Roads and Bridges. It is simply the hope of us in Sarawak, Sabah and also the people of neighbouring countries that the government can allocate funds to build a bridge over the Pendaruan River, which has not yet been built, that is the only missing link along the Federal Road in East Malaysia. So with the presence of that bridge, the Pan-Borneo Highway will finally become a road that is truly smooth to use. I also want to touch on the slopes earlier, because there are also slopes along the road from Kuching to Lundu, to Sematan that need the government's attention. I think this is a matter of delay in terms of preparing documentation and also investigation. So I hope that whatever is requested here can be given attention for the sake of road user safety. Thank you.
Please, Honourable Sungai Petani.
Thank you, Mr Chairman. I wish to take part in Head B.27 by mentioning only three matters. Item 050000 - Management Sector. I want to know from the ministry about the Federal roads maintained by Melati Wangsa. What kind of company is Melati Wangsa? Because recently, when a road in Sungai Petani was damaged by heavy rain, it was damaged. I called them to repair it. They said, "You have to go and see Melati Wangsa". The Public Works Department (JKR) said, "Go and see Melati Wangsa." Melati Wangsa came and looked at the road and said, "We can only repair it bit by bit. The excess rights, because it is within... that's it, you have to call JKR." So I also felt that something was not right. So I want to know, what is the role of Melati Wangsa? I have been informed that they are to take over the maintenance of Federal Roads. From Perlis, perhaps, down to Johor Bahru, we might guess. But the question now is, how, what is their actual role? If there is damage, how is it to be dealt with? So sometimes, even Members of Parliament do not know this. When damage occurs, do we call JKR or call Melati Wangsa? We do not know now. So I ask that the ministry inform this House what their role is, what their duties are, and what responsibilities they are supposed to carry out. Second, Mr Chairman, I would also suggest that the ministry look at the names of these highways. If village folk want to come and they call us, "I want to go to Haji So-and-so's house. Please give the directions." We would say, "Enter BKE, exit and enter DUKE, then enter KESAS. From KESAS go straight to PLUS."
I think it is difficult, I suppose. What harm would there be in changing these names and replacing them with numbers? Take Highway 48, exit straight and enter Highway 36, then find Highway 26, stop near the mosque. So village folk can easily remember, Mr Chairman, instead of DUKE, DKE, PLUS, KESAS, and then LITRAK. So Mr Chairman, we feel they could put KESAS or something, but if possible make it easier for the people to remember, because when we are driving and looking for KESAS, where is it, DUKE, which way, we are afraid of accidents, Mr Chairman. But if we put big numbers, like in Los Angeles, Highway 48, and we know that we should not stray far from 48, then after that 37 becomes easier. I propose that the ministry look into this matter so as to make it easier for the people, because there are more and more highways now. So even remembering all these names, I think it is difficult, lah, "I suppose".' Next, Mr Chairman, is Item 040000 – Specialist Sector. IKRAM is indeed an institution that receives respect, but sometimes the reports from IKRAM are very slow, for example when IKRAM was entrusted with carrying out a survey and also preparing the report on the collapse at Bukit Antarabangsa. The people waited a long time for this report. I think the time has come for IKRAM to tighten up a little. If there are not enough staff, they should say so; if there is not enough equipment, they must say so, so that we can all help IKRAM together. So what is causing some of the reports from IKRAM to be so slow? I feel the time has come for IKRAM to live up to this great name so that it continues to receive recognition and respect from the general public. Thank you, Mr Chairman.
Earlier, the Honourable Member for Ampang stood up, but I gave the floor to the women Members first. Please, the Honourable Member for Ampang; after that I will return to BN because no women have been given the opportunity.
Good, Mr Chairman is fair.
Thank you, Mr Chairman. I would like to touch on Item 040000 – Specialist Sector, where I want to mention here, in one reply given by the Minister to the Honourable Member for Gombak on 9 November regarding the National Slope Master Plan. There is a discrepancy between the information provided by the Minister and that of the Director of the Slope Engineering Branch, where this report was completed in January 2008, whereas the Minister in his reply said the report was only completed in December 2008. So because of this discrepancy in information or facts, it is clear to us that this report should have been completed in January 2008, and therefore the landslide at Bukit Antarabangsa occurred in December 2008. So this raises a question mark, a question mark for the residents of Bukit Antarabangsa, that the Minister was not responsible in monitoring the landslide case at Bukit Antarabangsa. Here, if indeed the Minister made a statement that was untrue, then I think the Minister should be brought before the Parliamentary Select Committee for this irresponsible statement. Secondly, Mr Chairman, regarding the allocation of RM70 million to strengthen Bukit Antarabangsa after the landslide in December 2008 last year. So for this RM70 million allocation, I want to know what progress has been made, because when I went on a visit to the site at Bukit Antarabangsa, I found that the work being carried out was not as promised or reported. Among the matters that should be done and carried out by the slope branch under the Ministry of Works (KKR) is to identify locations whose physical condition resembles the landslide area, and embankment slopes. This slope branch should also identify ways to rehabilitate the damaged drainage system and upgrade the small drains throughout the Bukit Antarabangsa area. It should also install an underground subsoil drainage system in areas with water seepage and high groundwater content.
Fourthly, it should also install detection and monitoring devices in high-risk areas. Fifthly, it should also carry out a complete study and monitoring of existing slopes that have shown signs of cracking; immediate preventive action and periodic monitoring must be carried out. Sixthly, a water pipe system on slope areas should not be buried underground; seventhly, water drain systems and sewage pipe systems in slope areas must be inspected and periodically maintained to prevent and detect early any leakage. So these are among the matters that were recommended by the Technical Committee on the Bukit Antarabangsa Landslide Study. I want to know what the status of progress is on the work that has been done to strengthen and rehabilitate the situation at Bukit Antarabangsa. Next, Mr Chairman, I also wish to question what obstacles exist for the Minister's side in classifying the investigation report...
[Speaking without using the microphone]
...the Bukit Antarabangsa landslide. If there is nothing to hide, then I think this matter should be settled. It should be made a public document so that residents can get justice; the residents of Bukit Antarabangsa should be able to obtain this report so they know how to manage their lives, whether they should stay there or take steps to move elsewhere for their own safety. So the Minister's side should not beat about the bush on this matter by saying that perhaps if requested it can be given, and given only to the 14 persons involved and so on. I think this is an unprofessional action, an action that is not open on the part of the ministry. Next, Mr Chairman, among the causes of the landslide at Bukit Antarabangsa, the main factor was the leakage of water pipes from the active water pipeline along the route of the abandoned houses, which increased the groundwater content in the area of slope failure. So what action will the ministry take to ensure that the abandoned housing project on the hill is managed, whether it should be demolished or what further action should be taken? That must also be done in order to protect the safety of the residents of Bukit Antarabangsa. Next, Mr Chairman, I wish to touch on Item 31000 – Road and Bridge Construction (New Projects), Item 41000 – Road Feasibility Studies (New Projects), Item 51000 – Miscellaneous Construction (New Projects), Item 60000 – Road and Route Upgrading and Item 61000 – Road Upgrading (New Projects), which keep talking about good roads, repaired roads, possible upgrading of roads and so on. I also want to ask here whether the ministry has made any plans or action plan to repair and upgrade the roads in the Ampang Town area, which for 20 to 30 years have suffered congestion problems, from the old days until now without any change at all. So I ask the Minister to please review the roads in the Ampang area and correct the road system so that traffic there does not suffer such severe congestion. And how does the ministry also take into account, when building new roads or upgrading roads, the road shoulders that are fully equipped with railings, which is one of the plans of general response budgeting; taking into account the safety of women and children in the middle of the road, so that roads with railings will hopefully prevent snatch theft, robbery and such incidents, and reduce such occurrences.
Street lights should also be increased, and increased not only at posts but make sure they are lit at night especially. Yes, that is all, Mr Chairman, that I wished to convey. Thank you.
Okay, I will give the floor to the Honourable Member for Sri Gading. After that, the Honourable Member for Labuan on the island matter. After that I will give the floor to the Honourable Member for Kota Raja.
Assalamualaikum Mr Chairman. In debating Head B.27 and P.27 of the Ministry of Works, in fact, our Ministry of Works is one of the good ministries, Mr Chairman, one of the ministries that has merit. Alhamdulillah, our roads are among the best roads in this world, in Malaysia. All the work of JKR, although there are some small weaknesses there. I also see the Minister's work is quite impressive, he is young. I want to speak first, Mr Chairman, on 02000 – Traffic Congestion Relief Scheme. As the Honourable Member for Teluk Kemang said earlier. I also do not know, Mr Chairman, what ghost is sitting at the junction to exit Port Dickson to go to Kuala Lumpur. This is because, Mr Chairman, we were stuck in a jam from Ayer Keroh yesterday all the way to Kuala Lumpur, four hours, Mr Chairman. Fortunately I am a healthy type of person, Mr Chairman. If it were the type who needs to relieve themselves, those with such illnesses would surely die. The congestion was not caused by any accident or anything, because from long ago, Mr Chairman, I have noted this, I have already raised this matter during the time of the previous Minister of Works. The President of MIC, who is he? Mr Chairman knows him, a friend of Mr Chairman...
The former Member of Parliament for Sungai Siput.
Yes, the former Member of Parliament for Sungai Siput. I started being a Member of Parliament, Mr Chairman, whenever we passed there it was jammed, whenever we passed there it was jammed, whenever we passed there it was jammed. I do not know, perhaps there is a ghost there, what is waiting there. I also said yesterday, if there is a ghost, I will slap its face. Let it run away from there, right? But this one, I do not know. So, how is JKR's... What is the reason, Mr Chairman? It is terrible, Mr Chairman, four hours on the expressway. My friend yesterday, the Honourable Member for Arau, from Arau to KL, 12 hours. He said that on normal days, Arau to KL, return from Arau to KL, going to Penang only takes 12 hours. This is terrible, Mr Chairman. Please, JKR, even if only once in a while. As P. Ramlee said, "kadang-kadang" (sometimes), but such occasional occurrences are torturous for us. It is different in Kepong; Kepong is in a city, it does not experience this. That is one matter, Mr Chairman. Second, 10001 - Highway Privatisation Project (PBT). I have been approached by several highway contractors. They said their works have all been terminated. Many of the small highway maintenance works of PLUS should be given to Bumiputera contractors, but that has ended. I have been informed, Mr Chairman, and I do not want to tell lies here. They said it is because it is monopolised by a contractor from Korea. I do not know whether it is true or not, wallahu'alam. So, this small project of RM70,000, RM30,000 to earn a living is monopolised by one company, related to highway safety. Please check it a little, this is the Minister's work, check it. If it is really so, please, please. Small Bumiputera contractors also want to live, Mr Chairman. So, I am afraid there is some inside play. The Highway Authority should look into it a bit, do not just mind your own business. Look a little at the fate of the small Bumiputera contractors who maintain the highways, Mr Chairman. That is the second matter. Third, what is the real story, Mr Chairman? I have raised this matter here before, Mr Chairman, also during the time of the Minister, my friend Mr Chairman, the Member of Parliament from Sungai Siput.
I said that the time has come when we cannot depend solely on the North-South Expressway. Cars are increasing, vehicles are increasing. It will become a torment for highway users. So it should be broken down, is that the right word for my speech? Divided, do not concentrate in one place. So, I propose first building a coastal highway. A coastal highway, from where the split would be, Teluk Anson? Entering Port Dickson, passing through Perak, and then straight to Melaka. Melaka to Muar, Muar-Batu Pahat. Batu Pahat-Johor Bahru. I have been speaking about this for how many years now. I have looked at it, but I do not know whether JKR has made any plans or not. I do not know, Mr Chairman, how JKR plans. Is money first available and then planned, or is it planned first and then funds are sought? That I do not know, Mr Chairman. If Mr Chairman knows, Mr Chairman can answer. I can sit down immediately. What I mean is, is money available and then planned, or planned and then funds sought. But in my view, surely the clever people in JKR plan first, make the proposals first, make their estimates, and then apply for finance. In my view, perhaps that is how it is. Wallahu'alam. Plan, plan. Dreaming, Mr Chairman. JKR too must dream a lot, dreams that serve a purpose, to overcome traffic congestion on roads, because sometimes roads cannot keep pace with the rate of increase in vehicles in our country. Yes, the country is prosperous, Mr Chairman, the Barisan Nasional governs. If we relied on PAS, PKR, DAP, we certainly could not be prosperous. So, our government is one that truly cares for the welfare of the people, and that is why the people are prosperous. Prosperous people can buy cars, and cars go on the roads. That is all, Mr Chairman. Thank you very much.
Thank you. The Honourable Member for Labuan, after that the Honourable Member for Kota Raja. After the Honourable Member for Kota Raja, I will give the floor to the Honourable Member for Tuaran.
Thank you, Mr Chairman, for giving me the opportunity to debate the Supply Bill 2010, Head B.27 and P.27. I will be brief, Mr Chairman. Revolving around the Federal Territory of Labuan. I wish to look at Item 050500 - JKR Federal Territory of Labuan. Although we in Labuan have a very sophisticated JKR Office, we also do not know in depth what long-term plans have been arranged by the ministry regarding the development of the Federal Territory of Labuan through its agency, namely the JKR agency in the Federal Territory of Labuan itself. This is because what we see at present is that development is not very brisk, and it is hoped that long-term planning will be able to develop further. The island that was declared a Federal Territory is the only Federal Territory in the Sabah and Sarawak region.
The second is Item 61000 - Road Upgrading (New Projects). Of the allocation of RM370.9 million allocated for this road upgrading, will some of it be used to resume the abandoned project in the Federal Territory of Labuan, namely the road between Tamu junction and Pancur Hitam or Batu? This project was previously implemented by a company from Peninsular Malaysia, and its value at that time was approximately RM52 million, and eventually it failed to be implemented, to the extent that they submitted an application for mutual termination, with respect, between the contractor and JKR. This project, until now, I think, for more than two years, has still not been implemented. What worries the people of Labuan, Mr Chairman, is that this is the only main road that connects the town and the Pohon Batu or Pancur Hitam areas, because originally the road was only a single carriageway, whose upgrading should have been made into a dual carriageway. So, if we look at it, this is the only dual carriageway road in Labuan.
However, that has been rather late and very disappointing for the people of Labuan. Even now, the street lights that should be lit at night cannot be installed, possibly because of the underground cable connection, which should already have been done as site clearing, so it still cannot be carried out. So, what are the government's steps, or those of the Public Works Department (JKR) of the Ministry of Works? When will this tender or project be carried out? Let us not, I mean the people of Labuan, be disappointed once again, when the road that was long awaited, and which in fact burdens the people because of this unfinished road, causes traffic congestion, especially when we want to go to the two secondary schools in the Tamu area. So, I hope that the government, with the allocation available in 2010, can carry out this project to resume it, because it has been neglected for too long. The next matter is when we look at maintenance on the roads in Labuan. As I understand it, this maintenance is carried out by one company, Syarikat Lintasan, if I am not mistaken. This happens in Sabah as well as in Labuan. What we see them doing is not that impressive, even though it seems to have been privatised. It is no longer JKR that carries out the maintenance, but a contractor appointed by JKR. If I am not mistaken, it will hold a concession for a very long time, between five and ten years. I am not certain, because this is between Lintasan and JKR. So, will the concession given to Lintasan continue or go on indefinitely? Or when will its contract be terminated? If possible in future, even if there is an appointment of a contractor for road maintenance, whether in Labuan or in Sabah, I hope it will be opened up or put to an open tender concept. Do not appoint just one person, so that I feel what has been done in Labuan is not that impressive, because sometimes the roads in Labuan are uneven, and even when maintenance is carried out, it takes a long time. So, is this what is called a capable contractor, who seems to have been appointed without open tender? Usually, if we want to appoint, if the contractor is good, at the very least they should be able to show their performance or capability in repairing or maintaining the roads. So, I hope the ministry can look into this matter. I hope that when we make appointments without tender, we choose the best. Let it not be that once we appoint them, they seem not to do the work themselves but subcontract it to others. So, I hope the ministry can look into this matter and that the problems occurring in Labuan can be resolved. Thank you.
The Honourable Member for Kota Raja, please.
Thank you, Mr Chairman, for giving me the opportunity. I would like to touch on Item 27, 050100. I would like to ask the minister: at Batu Empat, Jalan Kampung Jawa, there is a quarters that has been abandoned for a long time, left derelict and overgrown with undergrowth. I have received information that these are JKR quarters. I feel it is a waste, because when some of the people have no homes, how is it that these JKR quarters are not maintained and cannot be used? Secondly, I would like to ask about Item 27, 060700 concerning Toll Compensation Payments. I would like to know what is the cumulative total of toll compensation payments that have been paid to toll concession companies since the first payment or compensation was made? I also request this amount in detail by year and to which concession companies the payments were made. I would also like to know what is the status of the government's plan to buy back the toll concession companies, especially the North-South Expressway Project?
Mr Chairman, I would like to touch on P.27, 02800. In Selangor, I have been told that the maintenance of roads across the whole state of Selangor has been given to the contractor Roadcare (M) Sdn. Bhd. I have also been told how the payment is made: if there is no objection, meaning that they have not done the work, such as no complaints or reports accompanied by photos, for example if there is a road that has not been patched or repaired, then automatically they will make a claim and the state JKR will make the payment. I feel that Malaysians have not yet reached the stage of closely examining and inspecting roads and making complaints. I have been told that only two or three engineers are assigned to monitor the whole state of Selangor. This is something I feel they cannot possibly do, and indeed the condition of the roads, especially in Klang and in my area, is very bad. The road shoulders, along with the road, seem to have a sudden drop. If we ride a bicycle or motorcycle along the edge of the road, we may slip and fall. Secondly, under the same topic, I have found that sometimes traffic lights are hit by these big lorries, especially when they try to make a U-turn. Who is responsible for this damage? This is because, usually, within a few months they are replaced with new ones. So, are these lorries or heavy vehicles taken action against? Or are they required to provide a bond or deposit and so on? Then, the bond or deposit is taken after they have carelessly hit these utilities. Finally, Mr Chairman, P.27 - 61000 concerning road upgrading. I would like to ask the minister: when will Jalan Bukit Kemuning be upgraded? I was told last year that this project was actually under the Ninth Malaysia Plan, but had to be postponed, and at that time the minister gave an assurance that in the Tenth Malaysia Plan, the upgrading of Jalan Bukit Kemuning would be carried out. I also pass along this road almost every day, and this road is very bad. Moreover, the JKR drains on both sides of this road are not well maintained, and the drains are small.
Usually when heavy rain falls, flash floods easily occur on Jalan Bukit Kemuning. Secondly, on the same matter, Jalan Bukit Kemuning actually connects to the Bukit Kemuning roundabout, and at this roundabout it meets another road, namely Jalan Kebun. This road is also only a two-lane road. When will this road be upgraded to four lanes, because this road is very busy and there are many factories on the left and right of both roads I have mentioned. Thank you.
The Honourable Member for Tuaran, after the Honourable Member for Tuaran, the Honourable Member for Bandar Kuching, and after that the Honourable Member for Kuala Krau.
Thank you, Mr Chairman. I will be brief, Mr Chairman. Firstly, I would like to record that when discussing the items in this budget, it is directly related to the responsibilities under the Federal Public Works Department (JKR). However, every year the Federal Government gives, or allocates, a road grant to JKR Sabah. This is provided for in the Constitution. So I am of the view that, directly or indirectly, the Federal JKR should also pay attention to the situation in Sabah. Mr Chairman, I would like to touch on Item 08230 – Construction of New Bridges, 08260 – Upgrading and Rehabilitation of Roads, 08270 – Rehabilitation of Roads, and also 08600 – Pembangkang embinaan Jalan-Jalan. I think these are new roads. Mr Chairman, I would like to draw the ministry's attention to the construction of new bridges, where I see an increase in allocation from RM22 million this year to RM39 million in 2010. I would like to draw attention to the fact that in Sabah there are still many bridges in the form of Bailey Bridges, including one bridge in my constituency, namely Pekan Tuaran, where the bridge connecting the town to the other side of the road is still a Bailey Bridge.
So I hope and I request the ministry and also the Federal Public Works Department (JKR) to take action to replace this bridge, because it is outdated, and because it connects a town. I would also like to touch on one matter, where I see that when a bridge project like this is built, it is not planned completely. I mean, Mr Chairman, let me give an example. The new bridge at Tuaran, when it was built, did not take into account the effect of flooding upstream of this bridge, because the waterway has been blocked. Before the road was built, when floods occurred and water overflowed beyond the riverbanks, it flowed straight out to sea. However, when the road was built, the water is now backed up and only the river itself serves as the waterway. The result is that the villages upstream are now frequently hit by floods. So I have researched this project and I see that there should have been a culvert beside this bridge so that the water would flow straight to the sea, but this was not done. What is happening now is that the government has had to build a diversion drain to channel the excess water when floods occur. So, Mr Chairman, what I mean is that when a project like this is carried out in the future, all these aspects must be taken into account. Now, several areas, including the town of Temparuli, have projects that cannot be placed in one location because of new flooding caused by a road project. Mr Chairman, I would also like to touch on the allocation under 08260. I see that all these items have been given decreasing allocations. For example, Mr Chairman, 08260, from RM148 million next year, is only allocated RM100 million. That is Upgrading and Rehabilitation of Roads, which is a new project, whereas in speeches and in what was promised by the Right Honourable Prime Minister, Sabah is to be given special attention. But this is not reflected in allocations such as these JKR allocations. Likewise, Rehabilitation of Roads from RM21 million this year to only RM1 million next year. This does not at all reflect what has been promised. Likewise, I see Item 08500 falling from RM35 million this year to RM26 million next year. Likewise, New Road Construction from RM1.5 million to RM1 million. So I would like to ask the ministry whether there is still no need to rehabilitate, upgrade and build new roads in Sabah. When we look at it as "under ground" people in Sabah, the situation is worse compared with the roads in other states. Mr Chairman, I would also like to draw the ministry's attention to the road from Kota Kinabalu to Tuaran. Every time it rains, it is flooded. Not everyone sees that every time there is a flood, so the Tuaran section, Kota Kinabalu, at Inanam, often floods. I am of the view that this should not be happening now. I would like to ask who is responsible, whether JKR, JPS (Drainage and Irrigation Department) or so on? But there is no correlated effort, there is no combined effort from the relevant parties, even to this day. We ourselves, I believe, Mr Chairman, have also been stranded here because of floods. Why has it been left for so long until now? There have also been cases where women giving birth were sent to Hospital Kota Kinabalu and had to sleep in the middle of the road. This should not be happening now. Now there is an alternative route through UMS, but there too it floods, Mr Chairman. Some sections also flood. So I ask the ministry, once and for all, please find a way to solve this problem. Apart from that, one more matter I want to draw attention to, as my final point, Mr Chairman: roads in Sabah have been privatised for maintenance. State roads to one company, federal roads to one company, and what we observe is that the maintenance is only for cutting grass and branches on the sides of the roads, which nearly collide. Mr Chairman, I once parked my car in the middle of the road, I stood behind a pickup truck, I shouted, and I could hold the branch of a tree in the middle of the road. So I took a photo and I took the opportunity to send it to the Minister. I investigated why this happened. As it turns out, the terms of the contract signed between JKR and the contractor is only to cut grass three metres from the road shoulder.
It does not address cutting trees that have over-grown on the road. So I ask the Federal JKR to come down to the ground and see. Please contact me. I will bring it to the state roads and federal roads. This is very shameful. I have already alerted JKR Sabah, and this is because the contract was signed in that way. Then, related to this contract, Mr Chairman, JKR in Sabah no longer has staff, it is said, because the roads have been privatised, so there is no longer any need to add staff or labour force. There are district engineers who have only five to seven workers, with one grader, one shovel and one case machinery. So areas like Tuaran, Mr Chairman, are very large.
If the machinery is needed in an area like Kiulu, for example when there is a landslide near Tamparuli, it takes one week before they come down. I asked who is responsible for the trees. Nobody knows. So, at the bends that we know in Sabah, Mr Chairman, there are detours, yes. There you can see trees meeting above the road. So I ask for help. Even if JKR Sabah does not have sufficient capacity, I ask the Federal JKR to assist JKR Sabah. That is all, Mr Chairman. Thank you.
The Honourable Member for Bandar Kuching.
Thank you, Mr Chairman. I would like to refer to the details regarding the allocation set aside for Sarawak. I welcome the allocation of a total of RM355 million set aside for upgrading and building roads and bridges in Sarawak. I would like to ask how effectively this allocation will be used to upgrade and build roads and bridges in Sarawak? I would like to refer to a report in The Star, front page news in The Star yesterday, which I will quote here. What was said is "MACC investigations showed that only 40 per cent of the money set aside by the government were spent on the projects. The remaining 60 per cent were said to have been 'leaked elsewhere'." There is also a report from Datuk Zakaria Jaafar, who is the Deputy Commissioner of MACC Sarawak, who said, "He claimed that the misappropriation of funds took place between 2002 and last year, adding that MACC investigations showed that only 40 per cent of the money allocated by the government were spent on the projects. He, however, did not disclose what the projects were or which part of Sarawak the projects were being carried out. He noted that the projects involved infrastructure constructions for roads, housing schemes and mosques, among other things." Mr Chairman, if what the Deputy Commissioner of MACC said is true, today we are allocating a total of RM355 million for the construction and upgrading of roads and bridges in Sarawak. That means 40 per cent of this RM355 million will be used for the intended purpose. Only RM150 million will be allocated for the purpose that we approve here today. Therefore I would like to ask the Honourable Minister of Works: although MACC officers and MACC do not want to disclose who and which projects have been misappropriated or which projects have had leakages, I think the ministry must be responsible to this House to explain which projects? Which contractors were involved in this leakage? Before we can proceed to approve...
May I give way a little?
Later, after I finish my sentence. Before we can approve the allocation of as much as RM355 million, because all of this is the people's money. We do not want the leakages that happened before to continue again next year. Yes, please, the Honourable Member for Putatan.
Thank you, Mr Chairman. Thank you, my friend the Honourable Member for Bandar Kuching. I would like to ask the Honourable Member for a little explanation. When the Honourable Member debated the establishment of the MACC during the debate on the MACC motion, you repeatedly objected at that time. Now, where is the Honourable Member's statement of agreement? The MACC's statement now, or the government's?
The question is not whether I agree or do not agree. This is a statement made by the MACC, and the MACC under the Barisan Nasional Government, which did...
Honourable Member, Honourable Member for Bandar Kuching, please sit down for a moment. I am the Honourable Member. Sometimes if I do not reprimand someone, it does not mean I agree with what is being argued. I am tired of reprimanding. I have listened to the arguments of the other Honourable Members just now and they were all specific: which road, where to, which diversion and so on. This is because at the Committee stage everything is specific. The MACC officer in Kuching, Sarawak did not even say which road. The more than RM300 million that the Honourable Member mentioned was not said where either. It is as if we are debating policy again now. Can the Honourable Member be specific so that we do not waste time. Do not keep debating matters that should be debated at the policy stage. All Honourable Members already understand this. Please.
Yes, I understand, Mr Chairman, but this is a statement relating to the Public Works Department (JKR).
Honourable Member, Honourable Member, I know it is a statement if the Honourable Member says so. However, it should not be argued at the Committee stage, because that is the Standing Orders.
Yes, I know. Mr Chairman, Mr Chairman.
Honourable Member wants to argue with me again.
Mr Chairman, I accept the reprimand.
Please, okay, continue to another matter.
However, Mr Chairman, what we want to know is which contractors are involved, so that after we approve this allocation, it is not the same contractors who take the contract and repeatedly repeat the leakage that MACC has found. I would like to refer to the misappropriation in road maintenance, the maintenance of roads in Sarawak. This is because a 15-year concession was given to the company CMS Roads Sdn. Bhd. for the maintenance of roads totalling 4,600 kilometres in Sarawak. The award of this contract, which is for a full 15 years, was granted without going through an open tender process. Is the contractor CMS Roads Sdn. Bhd. involved in the leakage referred to by MACC? If it is involved in that case, the Ministry of Works should review the contract before continuing to allocate funds to them.
Do not say that because this company CMS Roads Sdn. Bhd. is owned by family members of the Chief Minister of Sarawak, therefore no investigation is carried out. I refer to the allocation for building bridges. Also in Sarawak, a contract to build more than 300 bridges. A contract to build more than 300 bridges was awarded, given to a company, Titanium Management Sdn. Bhd., which is owned by another son of the Chief Minister of Sarawak.
Yang Berhormat.
Ya.
Honourable Member, may the Honourable Member sit down for a moment?
Tanpa tender.
Honourable Member, please sit down. Sit down for a moment. Debate of this kind, firstly, violates the Standing Orders because this policy stage must be concluded. Secondly, even at the policy stage, when we look at the Standing Orders, under imputation of improper motives, this too is not permitted. Nevertheless, because this is the culture of the Malaysian Parliament, sometimes I just allow it. It does not necessarily follow that because he did not hold an open tender, he has broken the law. It does not necessarily follow that because he gave it to someone's family, that means he has broken the law. So, insinuation in debate like this, all of it is imputation of improper motives. According to the Standing Orders, when an Honourable Member has evidence that there is misappropriation, move a motion that there is misappropriation. Sometimes this leads to disputes, quarrels and commotion on matters like this.
Ya.
So, if the Honourable Member thinks there is wrongdoing there, make a motion. If not, I will stop the Honourable Member because this is wasting time.
Mr Chairman, imputation of improper motives is not permitted. An accusation of imputed improper motives is not permitted if this imputation is directed at a Member of Parliament, but the Chief Minister of Sarawak...
Honourable Member for Bandar Kuching, Honourable Member for Bandar Kuching.
...is not a Member of Parliament in this House.
Honourable Member for Bandar Kuching, Honourable Member for Bandar Kuching, do you want to argue with me again? According to the Standing Orders, when the Chairman says that is so, then that is so. Do you want more? If not, I will ask the Honourable Member to stop.
Tuan Pengerusi...
What, do you want to teach me again?
....The Honourable Prime Minister has said that he will practise a culture of open tender.
Yang Berhormat.
Oleh itu...
Honourable Member for Bandar Kuching, please sit down and the Honourable Member need not speak any further.
No! Mr Chairman.
Honourable Member, Honourable Member. If the Honourable Member does not comply with my instruction, I will ask the Honourable Member to leave under my authority.
No, Mr Chairman. Mr Chairman, may Mr Chairman listen to an explanation.
Honourable Member, please sit down. Because I have reprimanded the Honourable Member many times already, but he defies me and wastes time.
There is no defiance! I want to...
Please, Honourable Member for Kuala Krau.
Thank you, Mr Chairman. I would like to refer to 050000 – Management Sector. We know that this road has roads at state level, federal level and also expressways. I want to know, in terms of management and allocation under this ministry, how much allocation will be channelled to the JKR of the State of Pahang next year. I also want to know, under this management sector, there was previously a FELDA JKR. As the Honourable Jempol has put forward, the FELDA roads, as a result of development and existing infrastructure facilities, and also the income of settlers and settlers' children who have now grown up and work in other places. However, when they return to their respective areas, whether during the festive season or returning for some reason, this causes the roads in FELDA areas to become congested. I request that if the FELDA JKR has been abolished, these FELDA roads must be taken over by the state JKR or the federal JKR with sufficient allocations. One more matter concerning the management sector. I see that roads in our country, especially in the state of Pahang and also in Kelantan and Terengganu, have been handed over for maintenance to a concession company, Roadcare. Recently I had the chance to go home for the festive season to Kota Bharu, and I saw that the road from Gua Musang to Kuala Krai was very bad due to heavy rain, and the road was full of potholes. Many vehicles encountered or suffered damage or punctured tyres, and a journey that should take four hours took ten to eleven hours from Temerloh to Kota Bharu. From Kuala Lumpur, I think it is even worse, because it will pass through the Bentong town, which is congested, Raub town and also Lipis town. As the Honourable Lipis has said just now, it may take fifteen to sixteen hours. I would like to ask this ministry, how much allocation is there for the project to widen the road from Gua Musang to Kuala Krai, that is, the road widening project, and when will this project be implemented? One more matter concerning this Roadcare, a company that has been entrusted with maintaining the roads. I only want to ask how much allocation has been provided to this concession company? This is because I see that when there are problems or damage and emergencies, Roadcare will act swiftly to repair the road. However, when asked why it sometimes cannot be carried out immediately, it is because the allocation given to this concession company is limited, and I request that this concession company maintain and also upgrade the roads, including grass-cutting work, that the road shoulders are maintained, and that additional allocations can be given so that the public can use the road in safe conditions. One more matter, I would like to refer to 02800 – Repairing/Replacing and Upgrading Roads and Bridges. I thank the government because Route 98, from Simpang Empat Songsang to Jerantut, has completed its road widening. However, I am rather puzzled because there are projects to upgrade roads and widen roads, but there is no allocation to replace or widen bridges. When reaching certain bridges on Route 98, for example the bridge spanning the Krau River and also the Seboi River in Kuala Mai, the bridge is narrow and this often causes accidents. This is because before that, both lanes of the road were wide, but upon reaching the bridge, the bridge is narrow and can cause road accidents. I request that this Public Works Department be able to replace and also build new bridges for both bridges on this Route 98. One more matter, concerning 61000 – Upgrading of Roads (New Projects). I have spoken many times, both in this House and at every meeting with this ministry, requesting that the road be upgraded from the Kampung Awah junction, also in the Maran Parliamentary constituency, through Bandar Jengka, the Kuala Krau Parliamentary constituency, all the way to the Jengka 8 junction, which is in the Jerantut Parliamentary constituency, all of which pass through roads inside FELDA that need to be upgraded and widened.
This is because, as I stated earlier, from Kampung Awah or from Maran, it should only take half an hour to reach Bandar Jengka, but under certain conditions, during the festive season or when there are broken-down vehicles, it takes almost an hour and a half to reach Bandar Jengka. One more matter, concerning the upgrading of the FELDA Jengka 23, FELDA Jengka 22, FELDA Jengka 21 roads right through to FELDA Jengka 13 and onwards to the Bandar Jengka town centre. The same matter as well. However, Mr Chairman, I am rather puzzled when we apply, it is said there is no allocation. I agree with the Honourable Sri Gading.
When there is allocation, it is said there is no technical report. So I think when a technical report is made by the JKR Maran District, which has recommended that the widening of the road from Kampung Awah to the Jengka 8 junction, passing through Bandar Jengka which has been declared Bandar Tun Razak, a sum of RM49 million can be implemented in 2010. Also, the technical report for FELDA Jengka 23, 22, 21 and 13, a sum of RM20 million can also be implemented. One more matter concerning the construction of new roads after the completion of the Kuala Krau Bridge, which totals RM60 million, which has been approved and is under construction, and God willing can be used in February two years from now. Thank you to the government, but once this bridge is completed, there must be a project or road widening either on this side or that side after the Kuala Krau Bridge. Therefore, I request that an allocation of RM10 million from the Jengka 24 junction to the Jengka 21 junction be connected to Bandar Jengka so that this can also be implemented. Finally, Mr Chairman, concerning this East Coast Expressway under Item 70000 – Road Beautification Projects. I am puzzled because many times it has been mentioned by colleagues in this state of Pahang, the Member of Parliament for Maran, Paya Besar and so on, but we see that the East Coast Expressway is undulating and accidents occur very frequently, causing loss of life, especially I mention between after the Pahang River to the Chenor junction and up to Maran, the road is very undulating, especially in front of the JPJ Weighing Station. I hope this can be expedited for repair. Finally, concerning the construction of new schools and other constructions, I would like to ask about the monitoring of the construction of national schools and also secondary schools in the Kuala Krau Parliamentary constituency. I thank you because every school in my area has received a new block of buildings. However, I would like to look at the abandoned project, that is, the Kerdau National Secondary School in terms of the construction of its hostel. Thank you, Mr Chairman.
Please, Honourable Member for Kuala Selangor. After that, Honourable Member for Maran, and after that who is behind the Honourable Member for Kuala Selangor?
Petaling Jaya Selatan.
Okay, that one. After that, Honourable Silam.
Thank you, Mr Chairman. I will take as short a time as possible to speak on the items under Purpose P.27, Items 60000 and 70000 relating to Upgrading of Roads and Routes and also Road Beautification Projects. Overall, these are related to the interests of my people in Kuala Selangor. There are no major matters, because they have already been debated by my other Honourable colleagues. Firstly, in connection with the pedestrian overhead bridges found along the Kuala Selangor-Klang road, which do not have facilities for cyclists and motorcyclists to cross the road, especially those used by school pupils, Mr Chairman. For example at the overhead bridge of Sekolah Kebangsaan Jeram and also at SRA Sungai Sembilang, which have a divider or road separator.
Before more accidents occur, I hope the ministry will pay attention and take swift action to provide pedestrian overhead bridges for the convenience of cyclists and motorcyclists there as well. Secondly, the request for street lights at the JPJ weighing station area, Batu 22, Jalan Kepong-Kuala Selangor. There are village areas on the left and right of the road, and many fatal accidents have occurred, especially at night. The cause is simple, Mr Chairman, because this area is dark. The JKR Kuala Selangor has carried out a study and has also put forward a proposal to the Centre to apply for allocation, but until now there is still no response. I hope this matter will be given attention by the ministry urgently. Thirdly, the need for traffic lights at the entrance junction to Puncak Alam. The absence of traffic lights at this junction has resulted in frequent road accidents. This problem has been raised with the JKR Kuala Selangor but until now there is still no action. Finally, Mr Chairman, the Rantau Panjang Bridge in Bestari Jaya, the JKR Kuala Selangor has reported that this bridge is no longer stable and is only suitable for use by light vehicles. A conflict has arisen when the JKR took action to install barriers to restrict the use of the bridge to light vehicles. This route is the main road used by bus operators to carry students of Sekolah Kebangsaan Rantau Panjang and Sekolah Menengah Rantau Panjang from the Kampung Berjuntai Bestari area, Ladang Sungai Tinggi, Ladang Minyak, Ladang Mary and also Ladang Bukit Pagar. The JKR Kuala Selangor has recommended the construction of a new bridge but there is still no action. I hope Mr Chairman that all these matters will be given attention by the ministry. Thank you.
Please, Honourable Member for Maran.
Thank you, Mr Chairman, for giving me the opportunity to debate the supply for the Public Works Department, Ministry of Works. The first is Item 31000 – Construction of Roads and Bridges (New Projects). I would like to add a little to what the Honourable Kuala Krau has mentioned, that the condition of the East Coast Expressway is extremely bad now. I can say I pass through this road every week. If the Honourable Kuala Krau only goes as far as Temerloh, I go all the way to Maran and Kuantan. This matter has been raised by me several times since the previous Minister, but it seems the condition has still not been restored, and this undulating condition is extremely severe, extremely bad now. As mentioned by my friends earlier, many accidents have occurred, and I think we as citizens, I myself as a Member of Parliament and indeed a regular user of this area, really feel disappointed with the situation that has arisen. I urge the government and this ministry to take very serious action to ensure this road or this expressway can be repaired. We are forced to pay high tolls, with no reduction in tolls, but the road we use is extremely poor in quality. So I want to ask this ministry, how much has the government spent so far since this expressway was built? Up to now repairs are continuously being carried out, and certainly the expenditure to maintain this road or repair this expressway is higher than the actual construction cost. I want to know so that we do not give work to these irresponsible contractors, as mentioned by several of our colleagues, carrying out work that in fact does not provide restoration, but may cause even worse damage to this expressway. I urge the government and the ministry to pay attention and resolve the problem of this expressway so that it can be used safely by users from the East Coast all the way to Kuala Lumpur.
Mr Chairman, the second of which is Item 70000 – Beautification of Roads Project. I request this because I have raised this matter several times with the government and the ministry. The first is the Temerloh, Maran and Kuantan road. I request this because this is an old road. Although there is a highway, the existing road is still used by many vehicles, especially by those on low incomes and lorries that use this road at all times, and they seldom use the highway because they have to pay tolls and so on. So I ask that the government give attention to this road and be able to repair or widen it, because it is used by residents in the surrounding area, who are mostly from rural villages, including schoolchildren and so on.
So accidents that take lives frequently occur because of the narrow road, which of course is not only a loss to the government and society, but also a loss to our country because of the loss of citizens who may be of quality for the future of the nation. The second is regarding Jalan Kuala Bera, Chenor and Paloh Hinai. In the past this road was under the control of DARA, a regional agency that has been closed down by the government. For that reason I call once again on the ministry, through the Ministry of Works and the Ministry of Rural and Regional Development, to revive the role of DARA, the Pahang National Development Board, because this agency has been the one responsible all this time. Previously this road was quite good, but recently, because it was handed over entirely to the Public Works Department (JKR), its maintenance has been poor. I propose asking the government to upgrade this road because this road is very important, connecting Bera, Kuala Bera, Chenor and also Pekan. It is a shortcut or direct route that serves many FELDA areas, traditional villages and so on, and its status needs to be upgraded. Thirdly, Mr Chairman, is Item 91000 – Contractor Training and Advisory Programme. I thank the Ministry of Works for providing many job opportunities to our contractors, but I do not want to see us pay too little attention, or simply give up the responsibility of carrying out these projects to our contractors, some of whom are indeed irresponsible, only interested in profit but not carrying out the work well. So I want to ask the government or the ministry how many programmes have been run by the government and this ministry to guide, train or raise awareness among these contractors, so that the projects they obtain and carry out are not merely for financial gain or profit, but are their social responsibility, which is paid for by the government. Ultimately, the benefits should be enjoyed by the community or users. So I also want to know how many contractors have so far been subject to action as a result of their failures. We can see it; I need not mention them one by one. Many projects are good in planning, but when it comes to implementation they are very disappointing. In the end, they not only cause losses to us but also cause accidents and misfortune to the public. So I want to know how many contractors have been subject to action as a result of their negligence, causing these projects to fail, be damaged or be left unfinished and so on. Finally, Mr Chairman, is government housing. In the past, the Ministry of Works put forward an agency responsible for the maintenance, construction and so on of these government houses, under Item 18100. I want to know how many government housing units, or quarters units, with permission, for government staff, that are placed under the Ministry of Works up to today.
I have observed that recently, because government officers have obtained housing loan facilities, housing allowances and so on, which are good allocations for them, they have built their own homes, and many of these government houses are not well maintained. I want to know from the ministry how many government houses have been left abandoned, because in my constituency there are also houses of several agencies that are also placed under the Ministry of Works or the Public Works Department, which are not properly maintained by the government. This will certainly be a loss to our country. I propose that, if possible, these houses be repaired. In the districts, if we repair them and we have NGOs or voluntary bodies, non-governmental bodies that play a role for the community, helping to develop the community and so on, which do not have the offices they need, and sometimes loiter or take shelter at taxi stands and so on, what is wrong with the government repairing these houses a little and giving them to these voluntary bodies so that they can help us, the government, in mobilising and developing the community and so on? So, Mr Chairman, that is all, and I request to support. Thank you very much.
[Bangun]
Okay, the Honourable Member for Petaling Jaya Selatan, followed by the Honourable Member for Silam, and then the Honourable Member for Serdang.
Tuan Pengerusi.
Be patient and wait, your turn will come too, God willing. I will finish at 10.30 tonight... [Laughter]
There are three matters I want to touch on here. First, regarding supply item 60000 – Upgrading of Roads and Routes. I wish to refer to the construction and upgrading of the road at Batu 8 Jalan Klang Lama, from PJS 5 connecting to Subang Jaya, that is, after Plaza Tol NPE, PJS 2. This road has been under construction for years, and I understand that the JKR has already changed several contractors. Up to now, the construction and upgrading of the road is still not completed. I want to know what the main problem faced by the JKR is, such that this project has not been completed for years. I also want to know when this road can be fully completed. Has the ministry taken any action against the contractors who failed to complete this road? How much was the additional cost given to the new contractor appointed compared with the old contractor? Second, supply item 02000 – Traffic Congestion Reduction Scheme. I also want to request a concrete explanation regarding traffic congestion at toll plazas such as at Sprint Highway, the Seksyen 17 toll plaza near Jalan Damansara, and also traffic congestion at the LDP Toll Plaza near Sunway and also Sri Damansara, and also the Plaza Tol Lebuhraya Utara-Selatan, Damansara toll. The congestion is very noticeable before entering the toll and also after passing through the toll. An immediate solution is needed because toll payers have to waste money, time, energy, petrol costs and emotional distress and so on. All of this can affect a person's work performance. This congestion occurs every working day and is also recurring every year. I am raising this matter again because the answer given by the Honourable Minister during the policy debate the other day was very unsatisfactory. I want to know the nearest solution to overcome the problem of traffic congestion at these tolls. Lastly, regarding item 060700 – Toll Compensation Payments. I request the Honourable Minister to provide a detailed explanation of toll compensation payments given to each toll concession company in this country. Also regarding the closure of the toll at NPE, the PJS 2 toll plaza heading to Kuala Lumpur.
I want to know the total amount of compensation that has been paid to the New Pantai Express Highway toll concession company. When will the government announce the results of the study on toll concession companies in this country, whether they will be taken over entirely by the government or taken over by private companies? The people have been waiting for almost one year for this study. I hope the government can announce the results of the study as soon as possible. Thank you.
Thank you, Mr Chairman, for inviting me to also take part in debating the Supply Bill 27 and Development 27. I wish to touch on several items that refer specifically to the state of Sabah. Mr Chairman, when we look at the total allocation given by this Ministry of Works to the state of Sabah, I agree with my fellow Members of Parliament from the state of Sabah that this allocation is indeed insufficient because of the large geographical area of the state of Sabah. When we look further, the government's supporters' capacity now is indeed considered that Sabah is, with permission, a fixed deposit, a strong supporter of the Barisan Nasional Government. Therefore, I hope that this ministry will give attention, consider or review, by increasing the allocation given to the state of Sabah.
The item I wish to touch on here, Mr Chairman, is 08230 – Construction of Bridges (New Project). I want to ask the ministry about a bridge at Kampung Batu Lapan near the Segama River that is dilapidated and dangerous to the local residents. So I hope the ministry can give attention by replacing this dilapidated bridge with a good bridge that can be used by vehicles, especially the villagers in the Segama zone. [The Deputy Speaker (Datuk Ronald Kiandee) took the Chair of the Committee] Next, I want to touch on Item 08250 – Study on Slope Protection/Repair. I refer to the road connection linking the east and west coasts, especially through the Silam Parliamentary constituency, starting from Jalan Gunung Silam to the Tingkayu area. I have found that the slopes in that area, Mr Chairman, are not in very good condition. I request the ministry to allocate funds, and I also want to know that, if the Federal JKR does not provide a specific allocation, please explain to me how we can repair and study the structural condition of the slopes along the road between Gunung Silam and Tingkayu. Because its condition is very winding and zigzagging, it creates a dangerous situation for road users in that area. Next, Mr Chairman, I want to touch on Item 08260 – Upgrading and Rehabilitation of Roads (New Project). I want to ask the ministry: I see many roads, especially in the Segama village area and the Ulu Tungku area. Specifically, Jalan Patitung in Kampung Batu Lapan, Jalan Kampung Ulu Segama, Tawairi and Pendising, which the ministry should pay attention to. This is because I understand that these roads are under the maintenance of the Public Works Department. So I hope the ministry can take action to provide a specific allocation so that they can be repaired urgently. This is because the condition of the roads I mentioned earlier has not been upgraded for approximately more than 20 years. I very much request that the ministry pay attention to this matter, and I also want to propose that, because we find that roads in Sabah have also been handed over in terms of their maintenance to the private sector.
Technically, I request that this ministry send teams to survey certain road areas, because their specifics are not very clear. So I hope the ministry can plan the best for the residents in that area. Regarding Jalan Kuala Teguri and Ulu Teguri, which I have already raised in this august House recently, I request that the ministry carry out the construction project urgently by upgrading it. I also ask about the construction of new roads, namely the answer I received from the ministry about widening the road connecting Lahad Datu to Bandar Tawau and from Lahad Datu towards Sandakan. I want to ask the ministry when this road project will be started by the ministry? This is because complaints from the local residents are being brought to me, as their people's representative, day after day. So I hope the ministry can take urgent and appropriate action to enable it, because the ministry should have given me an answer that they would resolve it by way of measurement or inspection of the area. Starting from June and July last year, but up to now there are still no signs of when it will be built. I also touch on the item to build this road, namely Jalan Kampung Pangi in the Kunak district. I also understand that the management of the road connecting Kampung Pangi and Kunak town is under the maintenance of the Public Works Department. So I hope and want to know from the ministry what action has been taken by the ministry in resolving the road problem at Kampung Pangi? This is because recently the villagers made a statement in the newspapers about the road problems I have mentioned earlier. Mr Chairman, I want to touch on Item 12203 – Sabah, Buildings in the state of Sabah in particular. I want to ask the ministry: there are several building blocks, namely at Sekolah Menengah Teknik Lahad Datu and at Sekolah Kebangsaan Pekan Lahad Datu. Where the flats for teachers to live are under the care of the Public Works Department. However, the problem is that until today these buildings are actually not occupied by the people who live there because the condition is not safe. Yet they have still not been fully demolished. Whereas their structures are in poor condition and dangerous to the residents or users of both schools. I want to know from the ministry what planning has been done by the ministry for these teachers' flats? Will the ministry replace them with new flats? Because I see that they are indeed very dangerous. So I request that the ministry take this action urgently. Finally, Mr Chairman, regarding these buildings as well, when we look at the effectiveness of the delivery system, with permission, I find that the government's federal departmental agencies in the east coast area, especially in my constituency, are in a scattered condition and really not good in terms of providing services to the people or residents nearby. I hope the ministry can take the initiative to establish a Wisma Persekutuan in the Silam Parliamentary constituency. Because in terms of its location, it is between the northern and eastern roads, and although in future plans we know there are new roads to be built, I hope that a building for the benefit and convenience of the local residents can be considered by the ministry to be built in the Silam Parliamentary constituency for the welfare of the people in the surrounding areas and especially in my constituency. Thank you, Mr Chairman.
The Honourable Member for Serdang.
Thank you, Mr Chairman. I want to touch on several matters. Firstly, under Item 060700 – Toll Compensation Payments. I want to ask because among the eleven gifts to the people, announced by the Most Honourable Prime Minister to mark 100 days since he assumed the office of Prime Minister, one of the policies or gifts is that a discount of 20 per cent will be given to toll users for 80 times a month.
However, at the time he announced this new policy, there were indeed no complete details. So now, I would like to take this opportunity to ask: since 1 September until now, how many road users have been eligible to enjoy this toll discount? Also, because I feel the criterion of 80 times a month is too high. If the Federal Government wants our people to be able to benefit from this good policy, I think we should lower the 80-times-a-month criterion to 40 times or even 20 times a month. I think this would be more meaningful. The second question about this good policy is, I would like to ask here, who will pay for this 20 per cent discount? Will it be the concession company that pays for this 20 per cent discount, or will the Federal Government ultimately pay the concession company for this 20 per cent discount? If it is the Federal Government that pays for this 20 per cent discount, I think this is really meaningless. This is merely a policy to placate the people. This is because there is no difference whether the toll users pay themselves or the toll users pay tax to the Federal Government and the Federal Government then pays the concession company. So, I think if it is the Federal Government that pays for this 20 per cent discount, this policy is nothing but a fraud. The second topic I wish to touch on is Item 60000 – Upgrading of Roads and Routes. There is a project being carried out in Serdang, namely the Project to Upgrade the Junction of Jalan Serdang Raya/Jalan Puchong-Sungai Besi. This project began in 2006, but until now the project has not yet been completed. I have been informed by the contractor that this project will only be completed perhaps in June next year. So I would like to ask here, why is it that this project, which was supposed to take two years, now requires such a long period of three and a half years? This is because, in these three and a half years, road users have suffered hardship, as every morning and evening, traffic jams frequently occur there. The traffic congestion there is very serious. So I would like to ask, what is the reason the project's timeframe has been extended many times? I also want to ask here because I have been informed by the contractor for this project that one of the reasons the project's timeframe was extended is that there were problems with the design of this junction. The contractor informed me that the design initially made by the consultant or architect was totally unusable. So the contractor itself must appoint a new consultant or architect to make a new design so that they can carry out this project. So I would like to ask, is this indeed one of the causes that delayed this project? If this is a correct reason, a true reason, I would like to ask why the JKR (Public Works Department) initially used a design that was totally unusable? How much money have we paid to the first consultant for the first design? This is because I feel that if the design was totally unusable, yet we had to pay for their services, this is very unfair to the people of Serdang. Also, for my second question, I would like to ask about this project: how much allocation has been provided by the Federal Government for this project? Has the Federal Government provided an allocation of RM19 million for this project?
This is because I was informed by the contractor that the value of this project is only RM14 million. If what I was informed is correct, that means there is a balance of RM5 million. I would like to ask, how does the ministry plan to use that RM5 million? Could this RM5 million be used to upgrade Jalan Serdang Raya, because that road is indeed now facing a very serious traffic congestion problem. Another matter I wish to touch on under this item is the route of Federal Road 3215, or the Sri Kembangan main road. The Sri Kembangan main road was declared and gazetted as a federal road in 1996. However, after 13 years until now, this road is still substandard, not meeting the standards for a federal road. Some sections of the road have no street lights. Some sections have no signboards. The road surface is also uneven. So I would like to ask, when can the ministry upgrade the Sri Kembangan main road so that it becomes a true federal road? Not as it is now, where it only bears the name of a federal road but is in fact just a substandard road. That is all. Thank you, Mr Chairman.
The Honourable Member for Batang Sadong.
Thank you, Mr Chairman. I would like to focus on Item 09280 – Construction of Roads. I would like to ask the ministry about roads that have no street lights. In my constituency there are several roads without street lights, and they are very dangerous to pass through, especially at night when returning from the area. What I would like to propose here is that, at the very least, if the roads have no lights, we should install cat's eyes, with permission, or reflectors. Secondly, Item 040100 – Architectural Branch. I have received a lot of feedback, with permission, or information from the public, especially from persons with disabilities (OKU) and also from those who have reached senior citizen age. They state that public buildings are not OKU-friendly for them. For example, the ERL or LRT stations are too far for them to walk to reach the place where they board the train. So, I hope the ministry will take this problem into account. Earlier, I think a colleague over there touched on gender sensitivity in terms of construction. So, if possible, we ask the ministry to show more concern this time, so that we take into account OKU, children and also those in the senior citizen group. Thirdly, I would like to ask again under 06260 – Road Upgrading. There are several roads in the Simunjan area that have been approved. Many have asked me, when will they begin? Among the roads is a proposal to upgrade the road from Simunjan town to the ferry terminal at Batang Sadong, a length of 19 kilometres. This road is very much needed and very many residents use this road. Its users come from Kuching and various places to enter the Simunjan area as well as the Batang Lupar area, which is the area of our Honourable Deputy Minister of Agriculture. So, this road has been built for only 3 kilometres, while the road entering Simunjan has not yet been built.
It is very much needed and accidents have occurred on this road several times. So I hope the ministry can build it as soon as possible. Among the roads included are the upgrading of the Samarahan road, Kampung Ensengei Hulu, Kampung Sebuyau, Kampung Lubok Bunting, and also the upgrading of Jalan Kepayang, the road to Kampung Kedumpai, Simunjan, and the upgrading of Jalan Sungai Lingkau, Simunjan, and many more that have been approved. So I hope the ministry will pay attention to this matter, because this is already a promise from the government to the people, and these complaints have been raised to us several times.
I also see that several reports submitted to various government agencies touch on the same matter, so I hope we take swift action on this issue. Next, I would like to touch on Item 09230, namely Bridges. My question here is whether the Batang Sadong bridge will be built, and if it will be built, when it will be built, because those involved there, the houses located there, have asked me when construction will begin. Finally, Mr Chairman, regarding Class 'F' that was frozen under Item 040400, many contractors under this Class 'F' have appealed that, at least in the eastern state over there, Class 'F' be reopened. This is because not many people are there and they need business through this Class 'F'. I think that is all, Mr Chairman. Thank you for giving me this opportunity.
The Honourable Member for Bukit Gantang.
Thank you, Mr Chairman. I would like to go straight to Item 80000, concerning the road from the Changkat Jering toll junction to Pekan Terong and from Terong to Pantai Remis to go to the Port of Lumut. When will the ministry plan to straighten that road, because it is now very congested, used by road users travelling from Penang directly to the Port of Lumut. Item 08500, concerning Road Safety. I would also like to state that the road recently built by the ministry, which was completed almost a year ago, between Bota Kanan through Titi Gantung and continuing to Pekan Air Tawar, currently has a road divider placed along the entire road, which causes users to have to follow the rules by making U-turns in order to go to school, to the mosque or to petrol stations, even though the mosque is close to their houses but is located on the other side of the road. So I propose that this road divider be provided with a reasonable passage so that these people can use the passage without having to travel far to make a U-turn to go to the mosque or to those places. Thirdly, I would like to touch on Item 12200, concerning the Shared-Use Building (Bangunan Gunasama) allocated a sum of RM95 million. I understand the government has already signed shared-use building management agreements with no fewer than five large concession companies. I want to know how long the agreement was signed for, when it will end, and also the value of the contract. I understand that in the northern region, including the state of Sabah, was given to a consortium company, and we also do not know what criteria the ministry used to select the concession companies and grant such a long management period, understood to be between ten years, after it ended in 2012 perhaps, and then proposed to be extended by another five years. So I would like to ask why such an arrangement. For the southern zone, including the State of Sarawak, a company called Ambang Wira Sdn. Bhd. was appointed, and they too, and I also want to know what criteria the ministry used to give such a long contract to that company. At the same time, a company called Building Lindungan was given a concession for managing shared-use buildings on the East Coast, namely in Terengganu and also Kelantan, and they too received a fairly long concession period. So if possible, I also want to know the contract value of each of these concession companies. But unfortunately, Mr Chairman, the same arrangement was not applied to the central zone, which covers Kuala Lumpur, although Item 122000 does not include Kuala Lumpur, but of course it includes Putrajaya. Why was the same method not used by the ministry, indeed until today most packages in Putrajaya. I understand that the management of every aspect of these shared-use buildings is broken up, with permission, piecemeal.
So is this method more beneficial to the government, or more beneficial to private parties, since the contract can be split into various aspects, for example the technical engineering, building management, landscaping, cleaning and so on. Compared with the method I mentioned earlier, where one concession company is handed the entire management in full to just one company. So the method used by the ministry in Putrajaya, in particular, is that the management aspects are broken up according to the expertise of each. I also want to know whether this gives benefit to the government or advantage in terms of the management itself. Unfortunately, I also understand that several shared-use buildings located at Jalan Duta, Petaling Jaya and also on Jalan Salahuddin, these three government shared-use buildings have still not been decided upon, as to who will manage the buildings. So for that, I also want to know, if an open tender were conducted and the method I mentioned, the single-company monopoly method, were not used, we want to know why these three places, where shared-use buildings are located at Jalan Duta, Petaling Jaya and also on Jalan Salahuddin, why has this still not been decided? I understand that a company called Chulia Maintenance Sdn. Bhd., which has links with UMNO Youth (Pemuda UMNO). So if this is true, I would like to obtain confirmation whether it is true, because several companies, particularly Bumiputera companies, have tried their utmost to enter to submit tenders or quotations for these three shared-use buildings in Kuala Lumpur, yet it was offered, or may be offered, to one company at a much higher price than the companies that submitted tenders, in the range of 800,000 a month. However, the proposed company, I would like to get confirmation whether it is true that Chulia Maintenance Sdn. Bhd. has links with UMNO Youth, and how much its value would be if it were eligible. So we want to know, based on that eligibility, what the contract value is and how long the contract period is? Mr Chairman, I would also like to state regarding several buildings that collapsed under the ministry's care, during the period from 2008 to 2009, it is understood that buildings that collapsed, especially in Terengganu, involving a stadium that could only be used for one year. Subsequently, the building's roof collapsed, so I would like to know what exactly the ministry has done to ensure that the company carries out repair works without the government having to provide any financing for those repair works. The same applies to the case of a mosque whose roof collapsed at Kampung Batu Puteh in Kerteh, Kemaman, amounting to RM2.11 million.
So I would like to know whether Syarikat Tegak Wibawa Sdn. Bhd., which has already been ordered to rebuild the roof, will also finance the total cost of that construction. What is heartbreaking, Mr Chairman, regarding the hanging bridge that occurred in Kampar which caused three students to be killed and die, because it was assumed that the bridge had been gifted or donated to the school. However, I feel that at district level, of course the Public Works Department (JKR) under the Ministry of Works has its representatives in any District Action Committee meetings, and of course in the committee that sits almost every week, matters such as this can be detected earlier. So for that, I would also like to know, perhaps it is not under the care of the Ministry of Works, but to prevent such a situation from happening in the future, it is recommended that under the District Action Committee, district engineers and also those who are responsible under the care of the JKR must ask each head of department whether there are any gifts from any departments or private companies involving public use, and these must also be taken up by the Ministry of Works.
So, I recommend that the Public Works Department also take this up, and if the cost is financed by any party as a gift, then the JKR must also pay attention to ensuring that those projects comply with the standards set by the Public Works Department or the Ministry of Works. Thank you.
[Bangun]
The Honourable Member for Lawas.
Thank you, Mr Chairman. I would like to raise several matters under B.27. Item 06260 – Road Upgrading (I); Item 09260 – Road Upgrading (II); Item 09600 – Road Upgrading (III), under road upgrading in Sarawak. Mr Chairman, on the Lebuh Raya Pan Borneo in my constituency in Lawas, there are several areas of road erosion, and as a result the road cannot be fully used. Only part of it is usable, namely one lane for vehicles both going and coming, opposite direction, with permission. This matter has been left for so long; the erosion has existed for not less than two years. So when asked, the reason given was that there is no allocation. Until today, the road erosion in particular between Lawas and Merapok has not been repaired or upgraded. I ask the ministry to instruct the Public Works Department (JKR) to carry out repairs or upgrade this road as quickly as possible. Besides that, there are also several dangerous areas on the highway for traffic, particularly for road users. Many accidents occur there because of the sharp and tight bends, and also the hill that was not levelled during the construction of the road, and up to now the hill remains high, so cars travelling there cannot see, particularly the oncoming car, with permission. So collisions occur on the hill. This has resulted in several deaths. So I would also like to ask here when this unsuitable road, or road that does not follow this standard, can be properly implemented. I recall that at one District Action Committee meeting, a police officer asked the JKR of that time about this poor road. The statement the police officer made at that time was, with permission, "The worst engineering", he said. This is what the police officer said. This illustrates how very bad the condition of the road is, to be described as the worst engineering, with permission. So here I ask that, with the allocation next year for road upgrading, this situation be rectified to prevent accidents on that road. Next, Mr Chairman, Item 09280 – Building Roads. Not long ago, approval was announced to build a new road to Bakalalan from the Bakalalan road. So here I ask how much allocation is available and when the implementation of this road, namely the road to Bakalalan, will begin. The next item is 09230 – Bridges. The highway mentioned earlier in my constituency in Lawas has a bridge at Sungai Pengalih. This bridge is a single-lane iron bridge built under the Colombo Plan long ago. The bridge is already old and there are cracks and damage; repairs have been made, but its condition is poor. So I ask here whether the bridge will be implemented under next year's allocation, because with the bridge's present condition, cracked and damaged, I feel it will not last long. Therefore the ministry should give its full attention to the implementation of this bridge. So, Mr Chairman, that is all. Thank you, I beg to support.
[Bangun]
Honourable Kota Kinabalu.
Thank you, Mr Chairman. In Sabah there is a saying that is true, with permission, "if you want to see the worst road condition in Malaysia, come to Sabah". In Kota Kinabalu, it is difficult to find a flat road. The Tuaran Road from kilometre 9 to kilometre 15 needs resurfacing. It has been almost five years with no action taken. The master plan for sewerage, the master plan in Kota Kinabalu, has been spoiled. Many good roads are being dug up here and there. So the Federal Road is already damaged, almost impossible to restore. This all needs resurfacing, and the Sapulut to Kalabakan road, 120 kilometres, needs asphalt because this road currently uses gravel.
This is very dangerous for small cars and heavy vehicles. Many accidents have already happened on this road. I want to ask the ministry: how much allocation from these items is there for upgrading roads in Sabah? This is because I see my colleague from Sabah, the allocation seems very small. It is not enough to do all these roads. So, I will be frank, can the ministry add 50 per cent to this estimate? Thank you.
[Bangun]
Honourable Ranau.
Thank you, Mr Chairman. I refer directly to Item 80000, the role of the Public Works Department (JKR), including engineering fields, road construction, and so on. Before I proceed to touch on something specific, with permission, I would like to express my many thanks to the Ministry of Works (KKR) for working to improve the condition of the highway from Pekan Tamparuli to Pekan Ranau after I raised the condition of that highway in the previous sitting. There has been at least some improvement, although much more effort still needs to be made to ensure a better and satisfactory standard. Mr Chairman, I would like to touch on a bend on the highway at Kilometre 22 of the Ranau-Tamparuli Road, along the West Coast to East Coast Sabah Highway, which Mr Chairman yourself also uses to go to...
Ya.
...Sandakan. This bend is too narrow, sharp, and dangerous. Moreover, travelling from Tamparuli to Ranau, it is steep. I myself, Mr Chairman, was involved in an accident at this bend not long ago, just last year. According to the report of the Ranau Police, many accidents have already occurred at this bend. To be specific, Mr Chairman, the Kilometre 22 bend on the Ranau-Tamparuli Road is near the junction to the entrance to Taman Kinabalu. Accidents still continue at the bend I am referring to, Mr Chairman. This is because at this moment, I have just returned from my constituency and red and white ribbons have been put up along the bend on the road, showing that this bend, or this place, is dangerous to road users, and below it is steep and dangerous. Actually, Mr Chairman, I have brought this matter to the ministry through an oral question in the recent sitting, and I was told that the ministry has no plan to reduce this bend because the place is hilly and land collapse may occur. I do not really accept these explanations or reasons, and I am not convinced that the ministry lacks the capacity or expertise to reduce this bend. This is because we do not want accidents at this bend to keep increasing. If in future accidents happen again and lives are lost, will the ministry be responsible for this matter?
Mr Chairman, I would like to appeal, or request, action and seriousness from the ministry, particularly on this matter, to take measures that reduce this dangerous bend. I believe and am quite confident that we have the expertise of road engineers and skilled consultants from the ministry and also from the private sector to do something so that this problem can be contained, improved, or resolved. Mr Chairman, if I may, I believe in the beliefs of my ancestors about this place. My ancestors were in fact of head hunters' descent, with permission. This bend can be regarded as a bend or place that is haunted. There is also the Honourable Member from Sri Gading... [Interjection] referring to a big ghost at a place on a road in the Peninsula. Perhaps there is something like a ghost there too. Likewise, if we follow the beliefs of people who believe in feng shui, this place's feng shui is indeed not good. However, actually, Mr Chairman, the matter is not whether this place is haunted or this bend has a ghost and bad feng shui, but that this bend is indeed very dangerous. Because it is narrow, when vehicle users drive fast, especially coming down from Tamparuli, they will easily lose control to the side. That is why I was involved in this accident, because vehicles coming from Tamparuli "makan jalan", as we say in Sabah.
At the very least, this bend should be reduced, and there is no reason why the ministry has no capacity, no allocation, and no staff or engineers who can do something to help reduce this bend. Another matter on which I want an explanation from the ministry, Mr Chairman, concerns the highway in front of SMK Tamparuli. Perhaps Mr Chairman yourself also knows of this situation, namely that there are two lanes on one side and two lanes on the other side. However, now it has been made only one lane instead of two lanes, reduced to just one lane. So this complicates road users and is very dangerous. I myself travel at night because I sometimes use this road with two lanes. However, now there is only one lane. On one side one lane, and on the other side also just one lane. I do not know why this road was made like that, with only one lane. One lane on this highway is not suitable in my opinion, Mr Chairman. I want an explanation from the Honourable Minister of Works. If it is only temporary, when will it be restored to its former condition, as it was before. At the very least, the problem of having to pass through only one lane will go away.
Yes. May I wind up, Honourable Member?
Ha?
Gulung.
Yes. Okay. Just a little more, Mr Chairman. Actually, Mr Chairman, those are all the matters I wanted to raise, and I seek the explanation and answer from the ministry concerned. That is all, thank you.
Honourable Member, I will close the debate at 8 pm later, or I will call two more Members so that the ministry is given two hours and twenty minutes to reply. I would like to call the Honourable Member for Kota Melaka, followed by the Honourable Member for Sekijang, and then the Minister will reply.
Thank you, Mr Chairman. Mr Chairman, I would like to refer to several items, namely Item 040000 – Specialist Sector. Item 040500 – Structural and Bridge Civil Engineering Branch, and also in Item 010000 – KKR Management. Development, namely Item 010300. This may also be related to Item 89000 – Land Acquisition for Road/Bridge Projects. Mr Chairman, there is only one specific matter I want to bring to this House, namely the proposal of the Melaka State Government for a mega project, namely the construction of a bridge from Melaka to Dumai, Indonesia, whose construction cost is said to be worth USD12.5 billion, which is only the part to be built by Malaysia, our country, but not including the part that will connect, to be built by the Indonesian state. Mr Chairman, according to my question in this House, the ministry in its reply stated that in 2007 an application was made and was rejected. At that time, the applicant was asked to carry out a feasibility study, but it stopped at that point. Recently, another application came from Straits of Malacca Partners. What I am worried about, or what the people, especially from Melaka, are worried about, in the Melaka State Legislative Assembly recently, is that a motion to cancel this project, tabled by my fellow colleague, the State Assemblyman (ADUN) for Ayer Keroh, Melaka, was rejected, that is, it failed to cancel the project, and therefore an impression was given that this project will go ahead. In The Star press statement it is very clear that the Most Honourable Chief Minister of Melaka said the project had been notified to the Federal Government and there is a strong possibility that this project will go ahead, and also in the debate it was said that the President of China, Hu Jintao, agreed with this project from his smile. Because this motion was rejected in the State Legislative Assembly and there is still no announcement from the Federal side, this gives an impression that this project will go ahead. I have also received several calls from friends asking whether this project will be built at the place mentioned, and if so, they will invest and buy land around this project. This is because it is said that if the project begins, property tender prices around it will rise, and they will invest because they believe that if there is this project, there will certainly be ancillary projects or 'link' in roads and so on. In the reply, I understand that at the early stage, government agencies considered this project not viable. If it was not viable at the early stage, has a period or time limit been given to the applicant, namely Straits of Malacca Partners? Is there a time limit for them to complete studies such as the feasibility study or other studies that the ministry needs to take into account? I understand that this project will involve several agencies, including Public Works, and I have two or three questions to ask, namely what is the status of this project, part of which will be built by the Indonesian state? Until today I have not seen any concrete communication from Indonesia about agreement or what agreement exists between Malaysia and Indonesia. This is because even the length of the bridge is not yet certain. First it was announced that the Malaysian section is 48 kilometres, then it was said to be 50 kilometres. Recently, the statement by the Most Honourable said 37 kilometres. I am also not sure how long the bridge is, as well as the part our country must build, and the 79 kilometres to be built by Indonesia, what is its cost?
Are they able or do they agree to this construction? If not, let us not confuse them, especially investors. They do not know whether to put in capital or invest in the areas concerned.
That is why I hope that, if possible, this ministry will give a time limit and within a certain period announce whether this project is viable and will be supported by the Federal Government or rejected, so that we will not confuse investors and the public at the same time. I certainly regard this as a mega project that we cannot simply leave alone, with permission, because the passage of time, Mr Chairman, will cause somebody to become a victim, because of the absence of a precise stance or precise decision by the ministry. I hope that in the consideration of the Honourable Minister or the Honourable Deputy Minister, a more precise answer can be given, because according to the written reply I received, I consider it is not enough to convince. That is all, Mr Chairman, and thank you.
[Bangun]
Mr Chairman, I request your leave, Mr Chairman, in a few minutes.
Honourable Sekijang.
Earlier, Tan Sri had promised...
I have a note, Honourable Member, never mind, the Honourable Member may interject later and enter the debate.
Mr Chairman, I stand up at every opportunity given, I ask for leave for a few minutes.
Honourable Member, I call the Honourable Member for Sekijang. I have made my decision, Honourable Member.
Thank you, Mr Chairman. I will be brief and concise. I wish to touch on Item 010200 and I will combine it with Item 030100. The first matter I wish to raise here concerns the project to raise or upgrade the road to prevent flooding, from Kampung Tengah road to Kampung Tungku Tiga, Segamat District, which falls within my Parliamentary constituency. Mr Chairman, this project's signboards were erected more than two years ago, and the date and the contractor have already been set. However, to this day, of the two signboards that were erected, one has already fallen and the other is being eaten by termites, yet the project still cannot be carried out. When I asked about this project, they said that this is a state allocation and there is no provision for it. Nevertheless, Mr Chairman, for me and for the people, when the PWD (JKR) signboard is erected, whether the allocation comes from the state or from the Federation, what matters to them is that the project is carried out. I request that this project be continued and carried out by whatever means, so that we are not said to be deceiving the people. When we have erected the boards and by the time the boards have rotted, and then we say there is no allocation, this becomes a problem for us as people's representatives, who are the place of enquiries and the focus of the people. The second matter I wish to state here, Mr Chairman, is that the former Minister of Works had approved an allocation of RM500 thousand for me, especially in the FELDA area, where many drains and gutters need to be built because water from the road overflows into the homes of the settlers. So, until today, I still have not received this allocation, although I believe that I and the district engineer have already prepared the working paper and sent it to the state government and then to the Federal Government. Until today, today is 30 November, and the new year will soon arrive. This matter has also been communicated to the people and the areas that were to receive the project, but it has still not materialised.
So, we should not say we will give, but when there is a change of Minister and so on, we then try to avoid and set this matter aside. I request that urgent action be taken on this matter, so that before the end of this year, what has been promised will become a reality. Thank you, Mr Chairman.
Honourable Minister.
Mr Chairman, may I ask for an explanation: while we sit in the House, from morning until night, and stand many times, we still cannot speak. What is the use of us sitting in the House?... [House in uproar]
Yang Berhormat...
Actually only two people are left. I think the Deputy Minister is a clever, good and fine person; he can certainly give two more people the chance to speak. This is because I feel the Deputy Minister is a clever, good and fine person...
Honourable Member, thank you, Honourable Member.
...Because we have prepared speeches, but Mr Chairman does not allow us to speak, so this is truly a loss to all the people of Malaysia... [House in uproar]
Honourable Member, okay, please sit down, Honourable Member.
As in Bakri, I have brought an example...
Please sit down, Honourable Member.
This is because of the problem in Bakri, the Muar bypass road. I want to call on the Honourable Deputy Minister to respond, this is a serious problem, not a trifling matter... [Laughter]
Honourable Member, many in this House wish to speak in the same situation as you, but we are working within a time constraint; we cannot debate all day. We also cannot debate every ministry; according to the record I have, I have already given you two ministries. My colleagues have also given you the opportunity to speak, so do not feel that because you could not speak on this Ministry of Works, this Parliament has been unjust to you. For your information, not being able to speak is a challenge for Members of Parliament. I was like that too in the past; my seat used to be where the Honourable Member for Seremban sits. The same goes for you: we cannot speak and debate on every ministry, and many others, and on this side too, some have stood up. The Honourable Member for Parit has been standing since this morning but still could not get a chance. Many Honourable Members, so I apologise. I am giving two sessions of 22 minutes for the Minister to respond. Any Honourable Member may interject, and whichever is suitable to the sketch you raised earlier may come in and interject on a suitable topic. Do not, Honourable Member, go in and speak to shift to another subject, as happened in the previous ministry. Look for a suitable place, and the Honourable Member may interject on a topic that matches the matter being answered by the Honourable Minister. That is all, Honourable Member, thank you very much, and please, Honourable Minister, proceed to respond.
Mr Chairman, I have one request: from now on, each person should speak for five minutes only, please. Give the opportunity to other Honourable Members to speak.
That's enough, Honourable Member, enough, Honourable Member. Thank you, Honourable Member.
Thank you, this is just my suggestion.
Please, Honourable Minister.
Thank you, Mr Chairman. I wish to record my thanks to 36 Honourable Members. Actually it is 35, plus one, the Honourable Member for Jasin, who tagged on to the reply of the Honourable Member for Ledang. There are 36 Honourable Members who graciously shared their views and proposals and touched on the scope of duties and responsibilities of the Ministry of Works when debating the 2010 Budget at the Dewan Rakyat Committee stage for the Ministry of Works.
Among the Honourable Members who put forward proposals and questions were the Honourable Member for Ledang, including the Honourable Member for Jasin, the Honourable Member for Bagan Serai, the Honourable Member for Lenggong, the Honourable Member for Kepong, the Honourable Member for Tenom, the Honourable Member for Pokok Sena, the Honourable Member for Serian, the Honourable Member for Klang, the Honourable Member for Jempol, the Honourable Member for Pasir Mas, the Honourable Member for Putatan, the Honourable Member for Telok Kemang, the Honourable Member for Lipis, the Honourable Member for Jerai, the Honourable Member for Limbang, the Honourable Member for Sungai Petani, the Honourable Member for Ampang, the Honourable Member for Sri Gading, the Honourable Member for Labuan, the Honourable Member for Kota Raja, the Honourable Member for Tuaran, the Honourable Member for Bandar Kuching, the Honourable Member for Kuala Krau, the Honourable Member for Kuala Selangor, the Honourable Member for Marang, the Honourable Member for Petaling Jaya Selatan, the Honourable Member for Silam, the Honourable Member for Serdang, the Honourable Member for Batang Sadong, the Honourable Member for Bukit Gantang, the Honourable Member for Lawas, the Honourable Member for Kota Kinabalu, the Honourable Member for Ranau, the Honourable Member for Kota Melaka and the Honourable Member for Sekijang. I will try to answer and give explanations on the matters raised by the Honourable Members. Overall, if I may summarise, the issues that interested the Honourable Members relating to the Ministry include the status of proposals, implementation and maintenance of Federal Roads, payment of toll compensation to highway concession companies, safety of buildings and infrastructure, and finally, safety and repair of slopes. Mr Chairman, for the information of Honourable Members, allow me also to begin this speech by reporting the overall performance of the Ministry of Works in 2009, particularly within the Ninth Malaysia Plan in general. As announced by the Honourable Minister of Finance when he tabled the 2010 Budget, the Ministry of Works was proposed an allocation of RM3.25 billion for 2010, namely RM1.49 billion for operating expenditure and RM2.03 billion for development expenditure. Meanwhile, the overall development allocation ceiling for the Ministry of Works under the Ninth Malaysia Plan is RM23.1 billion, the second highest after the Prime Minister's Department. To date, the Ministry of Works has completed 269 projects, and 301 projects are under construction. Meanwhile, nine other projects are at the planning stage. A total of RM17.2 billion, or 76.1 per cent of the ceiling allocation from the RMK-9, has been spent to ensure that projects of importance to the people are implemented according to the set plan. Mr Chairman, I will now try to answer. The Honourable Member for Pokok Sena is just smiling... [Laughter] The Honourable Member for Ledang asked about the justification for compensation payments for the crooked bridge project from Johor Bahru to Singapore.
In fact, a claims committee at the Public Works Department (JKR) level has been set up to examine compensation claims from Syarikat Gerbang Perdana Sdn. Bhd. arising from the Government's decision to cancel the implementation of the project to build a bridge from Johor Bahru to Singapore. The compensation certified by the committee and agreed to by the Cabinet covers the following payments: works already carried out, extended-time payments arising from the postponement of works, and damages. The Honourable Member for Ledang also touched on the matter of modifying, widening and upgrading the road in Segamat, Tangkak, Johor. For the information of the Honourable Member, the design will be completed under the Ninth Malaysia Plan.
Excuse me, please. Just briefly, Mr Chairman, I only want detailed information on that matter. Earlier I was only informed of two items, namely extended time and also others. However, perhaps the Honourable Deputy Minister can prepare in writing more complete details beyond what the Honourable Deputy Minister mentioned earlier. Thank you.
Okay. Honourable Member, I have the entire officers of the Ministry here; they have noted it down and will provide the required information in writing. Perhaps it is in here, which I have not yet read.
Honourable Deputy Minister.
Honourable Member for Jasin, please stand, Honourable Member.
Thank you, Mr Chairman, thank you, Honourable Deputy Minister. I did not get a chance to speak, but I want to ask the Honourable Deputy Minister: when mention was made of the implementation of the new Tangkak to Segamat road, I want to say thank you to the Government because in the Second Stimulus Package, it approved the construction of a road from Tangkak to Ayer Keroh via Jasin. Part of this road is a new road, a cross-link from Ayer Keroh to Bandar Jasin with the aim of further enhancing development there. Part of it is from Jasin to Tangkak to upgrade the existing road. However, I have been informed that at this point the drawing has been completed and implementation is in the tender process, but the alignment of the road that was supposed to be upgraded to prevent flooding has been changed. This has worried the residents of the villages, especially since the road that was supposed to be built for the upgrade would prevent many detours and also the frequent flooding that already occurs there. So I would like to request, if possible, that I may receive a written reply. Thank you.
Thank you. I will provide a written reply, because the Honourable Member for Jasin's turn is not recorded here. The Honourable Member for Jasin proposed that tolls be imposed so that maintenance of Federal Roads would be better than that of highways. Highways are alternative roads to Federal Roads and other roads. Therefore, it is not appropriate to impose additional taxes or tolls on road users merely to ensure their maintenance is better than that of highways. For the information of Honourable Members. What problem is this?
May I stand again. What I actually meant is that I made a comparison: why are these two roads, between the roads maintained by the highway operators, which are beautiful and the best, because we pay, while the roads maintained by the JKR are far behind. Is it because the collection from road tax is insufficient for the Government to upgrade existing roads? Secondly, we want to know whether the Government will review the highway agreements with the existing concessionaires, because every year prices will continue to rise and users will be charged more. Thank you.
Okay, I have information here from B.27, which is the Operating Expenditure Budget. If every year we have RM400 to RM600 million to carry out road maintenance work, we can use this money to... The amount is not sufficient today, and we know this money is for maintaining 16,000 km of federal roads. Therefore, roads compared with highways, of course, the standard is somewhat different. The Honourable Member for Bagan Serai also mentioned the weak maintenance of drains and gutters that causes flooding in federal road areas. I do not know which road that was, there is no answer here, but we take note. The Honourable Member from Klang asked why the implementation of the third Klang bridge construction project was not financed under the economic stimulus package. For the information of the Honourable Member, this Ministry is aware of the importance of building the third bridge in Klang city to reduce traffic congestion. However, this project could not be implemented under the economic stimulus package because its construction period exceeds 24 months, as stipulated in the Malaysia Plan Package. This project also could not be implemented under the Ninth Malaysia Plan because the allocation is insufficient. Nevertheless, the proposal for this project will be resubmitted to the central agency for consideration of its implementation in the Tenth Malaysia Plan. The Honourable Member for Lenggong also said that flooding occurs because of bridges and culverts on both sides of the road. The Ministry has identified that there are many old roads whose hydraulic capacity of culverts and bridges does not meet current requirements, based on a study carried out in 2008. As a result of the study, a total of RM208 million is estimated to be needed, involving 169 locations, to build culverts, drainage, raise road levels and build new bridges on federal roads with hydraulic capacity in accordance with current conditions. The Ministry has planned to settle the project...
Excuse me, Minister.
Wait. Let me finish this first. The road-level raising programme covers the scope of raising existing road levels, building culverts and building new bridges in phases. To date, the Ministry has completed RM20 million worth of road-level raising projects in 2007, RM40 million was completed in 2008, while another RM20 million was completed in 2009. The Ministry will continue this programme in 2010 and under the Tenth Malaysia Plan to ensure that all locations are addressed so that the impact of floods can be reduced.
Mr Chairman, Honourable Minister, thank you. In fact, this morning, or rather this afternoon, I raised two issues. One concerns the third Klang bridge, and in fact on 7 January 2008, the ground was broken. The project was launched not only by the Minister of Works at that time, but also by the Sultan of Selangor. This shows that an allocation or provision has been made. The question now is, why, two years later, is there still no development in that project? So, in fact, is this a way for the Federal Government to neglect the State Government of Selangor and the people of Selangor, because they support Pakatan Rakyat? That is one. Second, the issue I raised concerns the report on the Bukit Antarabangsa landslide. This is an issue that has been discussed very intensely not only in Bukit Antarabangsa but also among the people of the state of Selangor. Is the Federal Government or the JKR waiting for this report to be classified? What is the Minister waiting for? Is this not an issue of importance to the people and also to the safety of the people, especially the residents of Bukit Antarabangsa?
Moreover, four people have died as a result of this landslide, and there must be an explanation, why did this happen? Is the government concealing certain water-related contractors who did work there? The report issued says that, due to the negligence of these companies, the collapse occurred. I request an explanation.
Mr Chairman, regarding the third bridge, in fact the allocation is insufficient, the ceiling is not enough and we have to postpone. Regarding the Bukit Antarabangsa report, I will touch on it later.
Honourable Minister, if there is not enough allocation, why did you break ground and launch the project? This is a way to distort the facts to the people, especially two or three days before the election.
[Laughter] I cannot answer. Honourable...
Honourable Member for Selayang, please stand, Honourable Member. Honourable Member for Selayang, to the front.
Oh, ya.
Honourable Deputy Minister, regarding the reason that allocations are insufficient, we in this august House have approved a stimulus package of RM67 billion, which is very large. Although we have a budget tabled in this session and also the stimulus package, we still hear that the government still does not have sufficient allocations. In my constituency of Selayang, there is also a project to widen the highway from the toll to the town of Rawang, which was listed in the Ninth Malaysia Plan (RMK-9), but after the election we were told that this project has no allocation and will be carried out in the Tenth Malaysia Plan (RMK-10).
My question is, why can we not use this RM67 billion stimulus package to allocate funds to the projects in Rawang and projects like the one the Honourable Member from Klang mentioned?
Mr Chairman, I have already answered earlier. The stimulus package, in fact, is for carrying out projects on a fast-track basis. If we build a bridge, that takes more than 24 months; it does not help to raise economic activity within that programme. That is the reason.
Actually, I was told by JKR contractors that this project can be completed in less than two years. Therefore it can be included in the economic stimulus package. But unfortunately it was not. So, this becomes a question of whether this is a way to treat as "step-children" the voters who voted for Pakatan Rakyat? That is the problem now.
We do not politicise projects. There is no... [Applause] The Honourable Member for Tenom asked for an explanation on the construction of a bridge in Tenom under item 08230. We have planned, in the programme to replace Sabah's state bridges, to build three bridges in the districts of Tenom and Tuaran, including the Nandatuan Bridge in Tenom. The design is being implemented under the Tenth Malaysia Plan. The Honourable Member for Tenom also asked for an explanation on the steep road conditions for the Kemabong, Sipitang and Keningau, Kimanis projects. These projects were implemented under the Eighth Malaysia Plan and completed under the Ninth Malaysia Plan. The Ministry is aware that these roads pass through mountainous areas. For mountain roads, mountain road, the permitted gradient does not exceed 12 per cent. Nevertheless, the Ministry is aware that the road gradient exceeds the standard in some sections. The Ministry will carry out a study to identify steep areas in the Tenth Malaysia Plan. The Ministry of Works is also organising a programme to repair the steep sections. The Honourable Member for Pasir Mas asked for the status of the Sultan Yahya Petra Bridge Project.
For the information of Honourable Members, the project to build the Second Sultan Yahya Petra Bridge was tendered on 28 July 2006, while the site handover was on 18 June 2007. The original completion date of the project according to the contract was 17 December 2009. However, the implementation of this project has been delayed, and the project is scheduled for completion on 10 February 2011. For the information of Honourable Members also, the actual physical progress at site is 32.8 per cent, compared with the schedule of 36.4 per cent. The project has been delayed by 32 days up to today's date.
The Honourable Member for Jempol requested that the Ministry of Works provide R&R facilities on Jalan Bukit Putus to enable many people to enjoy the scenery around Bukit Putus. For the information of Honourable Members, the Ministry of Works has already listed an integrated study to identify R&R locations along federal roads under the Tenth Malaysia Plan. Nevertheless, the construction of these R&Rs will fall under three authorities, namely the state, the local authority and the private sector.
The Honourable Member for Jempol also asked for an explanation of the latest status of the Seremban-Port Dickson Highway Project. Earlier, the Honourable Member for Telok Kemang also asked the same. For the information of Honourable Members, the project to build a new road from the Seremban-Port Dickson Highway, Federal Route 5 at Pasir Panjang, and to upgrade Federal Route 5 from Pasir Panjang to Linggi, Negeri Sembilan Section 1, had its site handed over on 14 February 2005. The contractual completion date was 12 August 2007. However, the project was delayed and rescheduled for completion on 1 December 2009. Nevertheless, the Ministry of Works is of the view that the project is still problematic to complete according to the new schedule. Therefore, a notice of termination of contract was issued on 1 October 2009 to the original contractor. For the time being, a new subcontractor has been appointed to complete the works not yet done by the original contractor, and monitoring is being carried out within the period of liquidated and a certain damages, with permission.
The Honourable Member for Lipis asked for an explanation of the Simpang Pulai-Lojing road project. For the information of Honourable Members, the Simpang Pulai-Lojing Gua Musang, Kuala Berang project is the construction of a new road and the upgrading of roads traversing four states, namely Perak, Pahang, Kelantan and Terengganu. The total length of the project is 318 kilometres. Implementation of this project has been divided into ten packages. For the time being, only Package 9 and Package 7c cannot be implemented because the approved allocation is insufficient. However, the proposal to implement both these packages is a priority for this Ministry and is being submitted to the Central Agency for consideration in the Tenth Malaysia Plan.
The Honourable Member for Lipis requested that a bridge across the Sungai Jelai, Kuala Lipis, be built under the Ministry of Works. For the information of Honourable Members, to implement the construction of this bridge, the Ministry requires a detailed study before any implementation can be carried out, given that there is no development on any river.
The Honourable Member for Lipis also requested an explanation regarding the allocation of RM50 million approved to upgrade the Benta to Raub road. For the information of Honourable Members, the approved allocation of RM50 million is to repair eight bridges and dangerous schools along the route from Benta to Jerantut. For the time being, the current status of the construction of those eight bridges is that five bridges have been tendered, while the remaining three bridges are at the design stage.
The Honourable Member for Kota Raja asked about the status of the upgrading project from Bulatan Bukit Kemuning to the Taman Sri Muda junction. The project to upgrade the road from Bulatan Bukit Kemuning to the Taman Sri Muda junction has been included in the list of projects to be implemented in the Tenth Malaysia Plan. However, its implementation is subject to approval by the central agency.
The Honourable Member for Limbang asked for an explanation on the construction of the Sungai Pandaruan bridge. In fact, I have answered several times in question sessions. Now we have entered the Tenth Malaysia Plan, and JKR Sarawak is preparing the scope and cost of the project to be used before the application is made.
The Honourable Member for Lipis asked about the status of upgrading Federal Route 8 from Kampung Relong to Gua Musang, Kelantan. For information, this stage is divided into eight segments, and the implementation status of these segments is as follows. Segments one to four, six and eight: preliminary design work has been completed. Segment seven: detailed design work has been completed. The fifth segment is under construction. As for the scope of the Federal Route 8 upgrading project, it will be implemented under the East Coast Economic Region, or ECER. However, its implementation is subject to the allocation approved by the Prime Minister's Department (JPM).
The Honourable Member for Bandar Kuching asked for an explanation regarding the report in The Star newspaper that 60 per cent of allocations for Sarawak projects has been misappropriated. For the information of Honourable Members, regarding the allegation by the MACC or SPRM that 60 per cent of Sarawak's allocation has been misappropriated, the Ministry still does not have detailed information on whether it involves Federal Government allocations or state government allocations. Nevertheless, the Ministry of Works will investigate the matter. Happy ya... [Laughter]
The Honourable Member for Bandar Kuching again asked for an explanation regarding the contracts for maintenance of state roads given to CMS Roads Sdn. Bhd. and Titanium Sendirian Berhad. For the information of Honourable Members regarding the contracts awarded to CMS Roads Sdn. Bhd. and Titanium Sdn. Bhd. for maintenance work on state roads, the contracts are funded by state government allocations and not by the Federal Government. The Ministry is not directly involved in these contracts. Happy, double happiness... [Laughter]
The Honourable Member for Tuaran requested that the Bailey bridges in the state of Sabah be replaced with new bridges. For the information of the Honourable Member, there is a project to replace old bridges in the interior of Sabah under the Ninth Malaysia Plan. There are also 45 bridges that have been completed, and 12 bridges have been carried forward to the Tenth Malaysia Plan. The Ministry will propose replacing the Bailey bridge in the Tuaran district.
The Honourable Member for Tuaran also asked for an explanation of why, in the Tenth Malaysia Plan, the planned bridge construction does not cover waterways or areas that cause flooding. For the information of Honourable Members, the Ministry has taken note of the matter and will instruct JKR Sabah to investigate. I will answer the other questions raised by the Honourable Member for Tuaran in writing. I apologise that I cannot answer them one by one, because then I will not be able to answer other people's questions, right?
The Honourable Member for Silam also asked about the dilapidated bridge in Silam. We have taken note and will include it in the Tenth Malaysia Plan, as well as the slopes in the Batu Silam area. We have taken note of the matter and will ask JKR Sabah to investigate. I will answer the other questions in writing, because there are many, a whole book here; two hours would not be enough to finish.
The Honourable Member for Silam also asked about the dual carriageway, two-way, namely Jalan Lahad Datu, Jalan Silam, Jalan Segama: when will it begin? For the information of the Honourable Member, it is under the special allocation of RM1 billion for the state of Sabah under the purview of the Prime Minister's Department. This project has been tendered and is awaiting the decision of the Tender Board.
The Honourable Member for Limbang asked for an explanation regarding the slopes in Limbang and from Kuching to Lundu and Sematan.
The Ministry will investigate and seek additional allocation to repair the slopes on the Federal Road in Limbang and also the Federal Road from Kuching to Lundu and Sematan.
The Honourable Member for Serian asked for an explanation regarding the road and bridge upgrading works in the Serian division. Most of the roads are under state jurisdiction and not under the supervision of the Ministry. However, the Ministry has looked into this and found that the project will be applied for through the Ministry of Rural and Regional Development.
The Honourable Member for Limbang asked about the poor condition of the road surface of federal roads in his area. I will answer in writing. The Honourable Member for Tuaran, who spoke about tree branches overhanging the road that have not been cut, will also be answered. We will investigate this matter because it falls under road maintenance.
For the information of the Honourable Member for Labuan, the selection of the concession company to maintain federal roads was made by the Privatisation Division, Economic Planning Unit of the Prime Minister's Department, and is now known as the Public-Private Partnership Unit (UKAS). The Ministry of Works, assisted by JKR Wilayah Persekutuan Labuan, functions as the monitoring agency to ensure that the concessionaire carries out the maintenance works included in the scope of the contract and that they are carried out according to the specifications set. The concession period for Lintasan Resources Sdn. Bhd. runs from 2003 until 2018, that is 15 years, as stipulated in the agreement contract.
The Honourable Member for Labuan also asked when the project to upgrade the Simpang Tamu to Pancur Hitam road, or Simpang Tamu, will be resumed. This project was cancelled by mutual termination in December 2008. For the information of the Honourable Member, JKR needs to redo the design in its entirety, a total redesign, with permission. The design has been completed. The project is expected to be re-tendered in early 2010...
[Bangun]
Honourable Member for Serian, I will answer the missing lane roads you mentioned just now. Honourable Member for Putatan, the riverside road along Pantai Tanjung Aru to avoid traffic congestion. In fact, we have already included it in the Tenth Malaysia Plan. The cost of this project will reach RM300 million. This is because it involves land reclamation. Honourable Member for Jempol, the upgrading of the road from Terachi to Bandar Baru Seri Jempol into four lanes, I will give in writing. The Honourable Member for Putatan asked for the embankment at KM 1 of Jalan Duvanson-Kotiduvan, Penampang to be repaired. It is funded by the State Government. Honourable Member for Limbang, Sungai Pandaruan bridge, done! The Honourable Member for Putatan then asked for an explanation regarding house compensation payments for the Traffic Improvement and Management Scheme along Jalan Kepayan-Kota Kinabalu. For your information, the compensation offered falls under the jurisdiction of the State Government, namely the Government of the State of Sabah. For your information, Honourable Member, the 60-year leasehold period has ended for all the land involved. If we follow the procedure, the Sabah State Government does not need to pay any compensation. Nevertheless, the Sabah State Authority has offered RM50,000 for each house, and the Ministry understands that this matter is still at the negotiation stage. The Honourable Member for Putatan asked for an explanation that the allocation of RM185 million for next year's plan is insufficient. In fact, in P.27 these are indeed development projects under the Ninth Malaysia Plan. We have now entered the fourth year, the end of RMK-9. Therefore, the projects have decreased and the allocation has also decreased for two consecutive years.
Honourable Member for Putatan, regarding the Pan Borneo Highway. It's okay, I can answer in writing. I will answer several issues raised by the Honourable Member for Putatan in writing. The Honourable Member for Jempol further requested the Bahau Bypass: when will the government build the Bahau Bypass? For the information of Honourable Members, the Ministry of Works, through the review of the Road Network Development Plan, has identified the Bahau Bypass Project as a high priority and it is proposed for implementation in the Tenth Malaysia Plan. The Honourable Member for Kota Raja asked about the payment method to the Roadcare concession company. The Honourable Member asked whether, if there are no complaints, payment can be made. For the information of Honourable Members, payment to the concession company Roadcare (M) Sdn. Bhd., which is responsible for maintaining federal roads in the central and east zones of Peninsular Malaysia, namely Selangor, Pahang, Terengganu and Kelantan, is made after the works completed are verified. The verification task is carried out by JKR staff in the Federal Road Maintenance Management Unit.
Honourable Deputy Minister, may I interject here? The reality, Honourable Deputy Minister, is that the state JKR staff are insufficient to verify whether all these projects or all this maintenance has been carried out. What they are relying on, actually, mereka bergantung kepada claims. If there is no objection or complaint from other parties saying that these works have not taken place, usually they will just sign and approve those claims.
Mr Chairman, thank you, Honourable Member. We will look into this matter. The Honourable Member for Kuala Krau asked how much road maintenance allocation there is for JKR Pahang for the year 2010, and how much road maintenance allocation there is for Roadcare for the year 2010. This is related to the Honourable Member for Kota Raja. That is indeed the central zone. The allocation for road maintenance in 2010 is currently being examined by the Ministry. In general, RM2 million is proposed to be allocated for the maintenance of federal roads in the state of Pahang. The proposed allocation for the maintenance of federal roads under the responsibility of Roadcare (M) Sdn. Bhd., meanwhile, is RM110 million, covering routine maintenance works and emergency works. The Honourable Member for Lipis...
Mr Chairman, may I interject? Thank you to the Honourable Deputy Minister for giving an answer on road maintenance. However, my question also covers how much allocation there is for state JKR to build new roads in the state of Pahang? Thank you.
Thank you, Honourable Member for Kuala Krau. This information is not in my hands. I will give it in writing.
Honourable Member, how much longer do you have, Honourable Member?
What time is it now? 9..., it will finish at 10.30, can we?
If we agree, all the written answers can be done, Honourable Member.
Yes, okay. Well, I am tired too.
[Ketawa]
After the answer to Kuala Krau.
Honourable Deputy Minister, please answer the question on the landslide at Bukit Antarabangsa.
I agree. I suggest answering in writing.
Honourable Member, these four Honourable Members standing here, what is the matter, Honourable Member?
Mr Chairman, perhaps for those MPs who are present, they can answer here. The MPs who are not here have already gone home; they will give written answers.
Honourable Member for Kuala Krau?
I agree that the answer to the Honourable Member for Kuala Krau is also given in this House.
Ha, that Honourable Member for Ledang, what is the matter?
I agree that it be answered in writing.
Honourable Member, make a choice. Answer in writing, or name the proposal: say who is in the House. Answer only if they are here; if not, don't bother.
I still have many. I think it is better that I give the answers in writing, especially those I know...
Regarding the issue of the landslide report, at the time in Parliament, right?
Okey.
Written answers, all written answers.
Okay. This is the last one I'll give. The others I will give in writing. This one I give to the Honourable Member for Klang, concerning the landslide at Bukit Antarabangsa, and the same request is also from the Honourable Member for Ampang. For the information of Honourable Members, the Ministry of Works (KKR) has carried out a study of the landslide incident at Bukit Antarabangsa, and the report was presented to the Cabinet on 19 August 2009 and was submitted on 14 September 2009. The Cabinet decided that the study report be classified under the Akta Rahsia Rasmi. Regarding the reclassification of the report under the Akta Rahsia Rasmi, the Ministry of Works will study this matter, and the results of this study will then be presented to the Cabinet for a decision. This answer also responds to the question from the Honourable Member for Ampang.
Honourable Deputy Minister, may I have the floor on this issue. Actually I do not understand why the government must consider the issue of this report, because what I found from the newspapers is that the government gave an assurance to the residents of Bukit Antarabangsa that a copy would be given to them after the report was released, that is one. Second, this is not an issue to be kept at home or kept in the Cabinet room, because this is to guarantee the interests and safety of the people in Selangor and also across the whole country. So, I think that by making this secret, under the OSA, it is totally unreasonable, because this is contrary to the concept of 1Malaysia which emphasises the rights of the people, as expressed by the Right Honourable Prime Minister. So, does this mean that the interests of the people are not given importance by the government?...
Tuan Pengerusi.
Deputy Minister, a short interruption.
Four people have died and millions of ringgit in money have been lost.
Mr Chairman, actually this has already been presented to the Cabinet. If we want to declassify it, we have to go back to the Cabinet. We cannot make this decision laterally.
Yes, does the Honourable Member for Ampang want to ask a question on the same matter?
Yes, it's the same thing.
What is preventing the Deputy Minister from making the report a public document, because it has nothing to do with national security. It concerns the interests of the people of Bukit Antarabangsa. They want certainty on whether they should stay there, continue living there, or must move. That is all that is needed.
Yes, alright Honourable Member. I understand the questions from the Honourable Member for Klang and also the Honourable Member for Ampang, but the issue is that the decision was made by the Cabinet. Unless that decision is changed or dissolved again, the Deputy Minister cannot answer that question, Honourable Member.
We need to go back to the Cabinet so that it...
He has promised to bring this matter back to the ministry, and we have to wait for the answer.
Kabinet. Ya.
So, to clarify a little. The Deputy Minister agrees to bring this case back to the Cabinet to make a decision?
Yes, that I agree. We will take advice from the legal advisers and we need to return to the Cabinet, the Cabinet Committee, because this was already released from there, declassified. To declassify it we need to...
Yes, the Honourable Member has understood it. The question raised here is whether the Honourable Member agrees to bring this matter back to the Minister to review before it is taken to the Cabinet. That is the question that has been raised.
Saya setuju.
Mr Chairman, Honourable Deputy Minister, under the OSA, which is the Official Secret Act, there is room, there are clauses which state that the Minister concerned may declassify. You don't have to go back to the Cabinet. The Minister concerned may declassify this document. So, with what the Honourable Deputy Minister has said, it should not be, because four people have died, they are dead. So, we have to be responsible to them.
I will bring this back to the Minister and the Minister will bring it to the Cabinet.
Tomorrow morning the Minister can declassify it, Honourable Deputy Minister. Tomorrow morning he can, even now he can declassify it.
Honourable Member, I think that's enough. I know well how a ministry takes action. So the Deputy Minister is also not able to make a decision tonight.
Yes, I cannot do it.
So the undertaking from the Deputy Minister, that he will bring it back to the Minister, is enough for me.
Okay, that is what I did not have time to answer, and I will answer in writing. Thank you.
The Honourable Member for Serdang, the Honourable Member for Serdang... [House in uproar]
Isu tol.
Deputy Minister, how long have we been waiting for an answer.
Mr Chairman, I can understand this if road issues have not been upgraded, such specific issues can be given in writing because they concern roads in certain areas. But issues that involve everyone across the whole country should be answered in Parliament. Otherwise the Deputy Minister could answer everything orally and there would be no need to come to Parliament. I think that is unfair. We are waiting in Parliament, we are here to listen to the Deputy Minister's answers so that we get explanations. If there is no explanation, why did we come out, and why do we return to Parliament at this time?
I ask for the goodwill of the Deputy Minister, because I know the Deputy Minister must also be tired, but the Deputy Minister only needs to come to Parliament today and answer today's questions. We Members of Parliament, however, have to come here and wait until 10.30 at night every day. I think that if the Deputy Minister is tired, we Members of Parliament are also tired, but we wait here because we consider the Deputy Minister's answer to be important. So I hope the Deputy Minister can also regard our questions as important questions and give an answer, because we have been waiting here for a long time.
The Honourable Deputy Minister.
Only about the toll. I ask for an answer, an oral answer, about the toll.
Has the Honourable Deputy Minister finished or...
Yes, I have finished.
Sudah habis?
Mr Chairman, I heard just now that the Honourable Deputy Minister gave an assurance to this Parliament that he will refer the issue of the landslide report at Bukit Antarabangsa to the Minister and report to Parliament before 12 noon tomorrow.
I cannot set such a time.
When, Honourable Member?
No, we will...
Or give a date?
Honourable Member, I think we cannot push, set a day and so on.
[Speaking without using the microphone]
Has the Honourable Minister finished? Said to be winding up just now.
Mr Chairman, just a suggestion.
Sudah jawab.
[Speaking without using the microphone]
The list of tolls is long; I have to give it in writing. Because this is toll compensation for us to raise tolls, there are 21 concessions, and we need to do it in writing. I will answer.
My question is direct. I want to ask whether the 20 per cent discount will be paid by the Federal Government or paid by the concession company? That is all, one short answer.
Okay, easy. This is indeed a social responsibility of these concessions. They give 20 per cent, bearing it themselves; the government does nothing.
The government does not pay?
Tidak bayar.
It's up to the concession owner to pay.
Deputy Minister, even if you are giving a written answer, it must be given to everyone here, because not only the people who gave speeches ask for other answers, but also those who are interested in the matter have no opportunity to ask, or have already asked and do not want to ask again. We too must get answers.
Honourable Minister, we have not finished with the landslide report. When can the ministry give a definite decision, when we will hear, yes or no?
Honourable Member, he has already told you just now, Honourable Member. He cannot set a day.
But he is the Deputy Minister.
No, Honourable Member. I hear you, Honourable Member. We cannot force someone to answer and give a decision which in the end he cannot set. So this becomes a big problem. So let it be with his determination that he will refer it to the Minister, and let the decision be made by the ministry.
I understand, Mr Chairman, but I think this is telephoning with the Minister...
It is indeed important, Honourable Member. Everything is important, Honourable Member. I consider what happened at Bukit Antarabangsa to be very important.
Mr Chairman, I will ask just a little.
The Minister has sat down, Honourable Member. He said he has finished.
It's alright, the Minister should listen a little, Minister.
Honourable Member, he has said he has finished.
We just want to know a little, Mr Chairman.
Yang Berhormat...
If he has made a determination...
If everyone stands up like this, the Minister says he has finished....
...What is the mechanism for us to know that he has got an answer to give to us, we only want to know that. After he has asked, discussed, when can we know how?
I have no answer to that question. So, Honourable Member...
Yang Berhormat...
The Minister has sat down, he said that is the only winding-up he can make. Where is the answer that he has not yet answered...
Mr Chairman, can we in the House know...
It is not me who is answering, Honourable Member.
No, one question only for Mr Chairman. Can we know where the Minister is? The question is, if the Minister were here he could give an answer now regarding what was raised by the Honourable Member for Klang. Where is the Minister? Are we not going to use bureaucracy? We raise that the Minister is not here, the Deputy Minister is here. The Deputy Minister cannot answer, says he will contact the Minister.
Alright, alright Honourable Member. I will answer that question.
This is the Committee stage.
I can answer that question, Honourable Member. We are Parliament, Honourable Member. I am not speaking on behalf of the Minister, so I am answering on behalf of Parliament. If the government sends a Deputy Minister here, I say the Deputy Minister should answer. Moreover, our rules state that whether it is a Parliamentary Secretary or a Deputy Minister, both are called Minister. The meaning is the same. So I have no answer as to why the Minister did not come. So we have to accept the fact that we in Parliament do not give executive directions, just as the executive should not give directions to us. So this is a basic concept. So this basic concept we must respect and understand deeply, Honourable Member, the separation of powers. So that is all, Honourable Member, thank you. If there is any doubt, you may contact the Minister in writing.
Before that, will the Minister give a written answer to everyone?
I cannot answer that on behalf of the ministry either, Honourable Member.
Honourable Members, the question is that the sum of RM1,490,643,000 for Head B.27 under the Ministry of Works (KKR), which forms part of the Schedule, be agreed to. The question was proposed for decision and agreed to. The sum of RM1,490,643,000 for Head B.27 was ordered to form part of the Schedule.
The question is that the expenditure of RM2,029,727,000 for Head P.27 mentioned in the Development Estimates for 2010 be approved. The question was proposed for decision and agreed to. The sum of RM2,029,727,000 for Head P.27 was approved to form part of the Development Estimates 2010.
Honourable Member, if we do not want roads to be built after this, then Honourable Member should not agree. Honourable Member should not complain next year that there are no roads, it's easy... [Applause]
Bill — Supply Bill 2010 and Development Estimates Motion 2010 Committee — Head B.28 [Schedule] - Head P.28 [Development Estimates 2010] -Bill
Supply Head B.28 and Development Head P.28 under the Ministry of Transport are open for debate.
[Bangun]
Yes, the Honourable Member for Kuala Krau.
Thank you, Mr Chairman. I wish to refer to Item 060000 - Land Transport, that is, referring to Item 060200 - Registration and Licensing of Motor Vehicles. So I thank the ministry and the government for only requiring a renewal of motorcycle licences at RM2. However, the problem is that when meeting with the insurance companies, the insurance companies have tried to identify whether these motorcycles are new or are less than five years old. Those that are more than five years old are generally ones that insurance companies do not want to insure. This becomes a major problem for rural communities, village folk with low incomes. Although they only pay RM2 for the motorcycle licence or road tax, they have to choose and search for which insurance company will insure them so that their motorcycles can get road tax. Therefore I request that the ministry ensure that all insurance companies do not take into account whether the motorcycle is new, but when inspected and found to be sufficiently complete and safe to use on the road, the road tax may be issued by the Road Transport Department (JPJ). Secondly, regarding Item 070000 - Railways. I want to know the consequences of the recent flood problems in the East Coast, where our trains can only reach Manik Urai and do not reach Kota Bharu, Kelantan and beyond. This means there are still railway tracks located in low-lying areas that require works to raise the level of the railway tracks, especially for trains to the East Coast. This is because the roads have been cut off, and trains also cannot be used as they are submerged by water. Secondly, regarding the railway. I want to know when the railway station for Kuala Krau will be restored; previously these trains stopped from Kuala Lumpur to Gemas, Gemas to Mentakab, and Mentakab stopped at Kuala Krau. But eventually these trains no longer stop in the town of Kuala Krau but stop at the railway station in Jerantut. I request that the ministry restore this railway transport facility to the residents of the town of Kuala Krau. Thirdly, the issue regarding railways, namely when the government, which was previously pressured by the government, will build railway tracks from Kuala Lumpur via Kuantan, Kuantan to Kuala Terengganu and Kuala Terengganu straight to Kota Bharu. When will the construction of these railway tracks begin? If it is to begin, how much allocation has been provided for the construction of railway tracks to the East Coast through the new alignment? Fourthly, regarding air transport, namely Item 100200 - Air Transport. I want to know whether the ministry has examined the fares charged by the AirAsia company? This is because at times the fare, for example to KL-LCCT, KL-Kota Bharu, at times the fare for one person is RM141. At other times it reaches more than RM300. Why is this happening? Is it because it follows demand, that if many passengers who need air transport use AirAsia aircraft, AirAsia will suddenly raise fares? This is different from MAS, which sets prices whether passengers are few or many. Fifthly, the issue of Item 100400 – Road Safety. I congratulate the Road Safety Department (JKJR) because it is always going down to the ground in the state of Pahang, going to schools to hold seminars, talks and also road safety campaigns. This department also supplies helmets to rural residents. Also during the festive season it gives donations of traditional cakes and food for breaking the fast. Only I want to know, since the Road Safety Department was established, has this department conducted an in-depth, careful study? Why is it that in terms of road accidents, our numbers keep increasing even though the Royal Malaysia Police carry out Ops Sikap during festive seasons? But it seems road accidents are increasing both on highways and on Federal roads. When these statistics are released, it appears road accidents are increasing more on Federal roads. Therefore I request that the ministry carry out an in-depth study. Is it because of the attitude of the public? Or is it because of cooperation with the JKR (Public Works Department) for repairs and so on? Thank you, Mr Chairman.
Yes, the Honourable Member for Rantau Panjang. Sorry, Honourable Member.
Thank you, Mr Chairman, for also giving me the opportunity to debate at the Committee stage under the Ministry of Transport. I wish to touch on Item 070000 – Railways, which relates to the Kereta Api Tanah Melayu, which we see from the allocation that has been given. I want an explanation, namely why the dilapidated coaches still operating on the East Coast have still not been completed, I think.
Thank you, Mr Chairman, for also giving me the opportunity to debate at the Committee stage under the Ministry of Transport. I would like to touch on Item 070000 – Railways, which relates to the Malayan Railway (KTM), as we find from the allocation that has been given. I would like an explanation as to why the dilapidated coaches still operating on the east coast, which I believe are still not yet completed at present.
I have been informed for a year, yet not a single coach has been completed for the east coast. To what extent have the ministry's efforts been made to ensure that the railway tracks, especially those affected by flooding, will be rehabilitated? Also, to ensure that in future the main transport route to the east coast, this railway, is not disrupted. Next, I would also like to know about the award of the contract to the company MKRC, which we want to know about. Why was this company chosen when it had previously failed in rehabilitating the railway? As with the first tender, 50 sets valued at RM170 million, it failed but was still given the next contract. This matter will certainly result in waste of the people's money and the country's money. So I want an explanation: why was the same company, which had been proven to have failed and to be ineffective, still given the opportunity to obtain this contract? Next, I want to know whether it is true, as the information we received says, that the railway station headquarters will be given to the company YTL? Why will the headquarters and building of Kereta Api Tanah Melayu Berhad be given to this company? Is this not a historic building that is very important to our country? So why did this happen, and what agreement was made? I also want an explanation regarding 080000 – Road Safety. During the festive season, we all know how many road accident cases occur. What programmes has the government implemented, apart from campaigns, to ensure these accidents are reduced? Because we find that among the causes of road accidents is the excessive number of bends. So what efforts have been made by the Ministry of Works and the Ministry of Transport to ensure that roads built are prioritised for the safety of passengers? Likewise, what studies have been done on the effect of rear seat belt usage? Although regulations have been made by the government, to what extent has compliance had an effect on passenger safety? Likewise, I also want an explanation on the safety of motorcyclists. We find that among the main victims causing many accidents are motorcyclists. So what strategies has the ministry made to reduce the risk of accidents involving motorcyclists in future? I also want an explanation regarding the wearing of crash helmets, on which we find many issues raised by ordinary people who are dissatisfied, when the government does not allow the wearing of a turban by those who do not wear a crash helmet, but for Sikhs who wear turbans, a concession is given. So I have received many complaints from the people about this matter. How is it that Muslims who wear turbans are not allowed and are subject to action, while Sikh riders may wear their turbans? So why has this happened, as if there is a double standard in road safety law? This is an important matter, especially when it involves religion. So I want an explanation: this matter should be re-evaluated by the ministry, especially as it involves the interests and safety of the people.
Next, I would like to touch on the issue of Item 050000 – Air Transport. I would like an explanation. When will the enlargement of Pengkalan Chepa Airport in Kelantan be carried out? Complaints we have received from customers, where many passengers are dissatisfied because the prayer rooms are too cramped, namely those in the terminal building itself, which are very small and unable to accommodate passengers who will continue their journey. [Mr Speaker is chairing the Committee]
This causes many passengers to feel irritated. So, I would like an explanation. Did the government, in constructing this airport terminal, not consider the capacity or needs for prayer spaces? Especially for states with large Muslim populations, certainly one of the main problems, with very limited time, is the very limited use of prayer rooms. So I hope this matter will be considered by the ministry in future, so that the welfare or needs of these customers or passengers are taken into account. I would also like an explanation regarding the port needs on the east coast. Among the main reasons why industry has not developed much on the east coast, especially in Kelantan, Terengganu and so on, is that they are far from port facilities. So we want to ask the government to give special consideration in future. It is not enough to have Kuantan Port, Johor Port or Port Klang, which are quite far, which results in costs, especially regarding relations with countries in the east, where the port on the Kelantan coast would certainly be closer and cheaper. So I would like to request the goodwill of the ministry to consider a special port for the state of Kelantan in future. That is all for now. Thank you, Mr Chairman.
Has the Honourable Member for Ledang not yet spoken today? The Honourable Member for Tenom is here, the Honourable Member for Silam is here, the Honourable Member for Labuan is here. Please. Please, the Honourable Member for Ledang. I remember. I remember who has already debated. Please.
Thank you, Mr Chairman.
If possible, the Honourable Member may also submit the debate in writing... [Laughter] Later the Honourable Minister will reply in writing.
I want to... [Laughter]
Sila.
Mr Chairman, I will go straight to Item 020000 – Marine Transport of Peninsular Malaysia. Although previously, Mr Chairman, Ledang and Muar were one district, now they have been split into two. Nevertheless, there is one project, namely the Marina Bay Project, Mr Chairman. The Marina Bay Project was completed almost three years ago, Mr Chairman. In Sabah, I think it has already started operating. But it seems that in Muar, up until now, it has not been used. Not under-utilised, but simply not used at all, the Marina Bay Project, valued at RM50 million, Mr Chairman. So that project is beautiful and eye-catching, but up until now it has not been used. So Mr Chairman, I humbly ask that the ministry clarify why this project seems to be a white elephant? Not used. If there are technical matters that may become problems and constraints to the use or implementation of this project in future, what actions has the ministry taken or will take to ensure that this project valued at RM50 million can eventually be fully used and become one of the attractions not only for tourists but also for other industries to come to Ledang and also Muar? Secondly, Mr Chairman, Item 050000 – Air Transport. Mr Chairman, it seems that air transport now using FireFly has begun to become popular. So for residents in the areas of North Johor, Ledang, Muar and Segamat, who have been waiting and waiting, although outside the Johor area, perhaps the Honourable Member for Bukit Katil would like to hear this, when will Batu Berendam Airport finally become a reality and be able to receive FireFly flight services, and subsequently provide maximum services to the people of North Johor, Melaka and South Negeri Sembilan?
Next, Mr Chairman, Item 070000 – Railways. Mr Chairman, there needs to be an explanation regarding a memorandum of dissatisfaction from the Kesatuan Pekerja-pekerja Kereta Api Tanah Melayu, which expresses their unease towards the ETS plan, or Electric Train Service, which has been made a subsidiary of KTMB. They are worried that if ETS is made a subsidiary, then all the interests or pride of KTMB will be lost, because they fear the function of KTMB will be reduced since, in their view, ETS is the main contributor or is an important service to KTMB itself. So Mr Chairman, there needs to be an explanation to the public, because this union has already sent memoranda, letters and so on to all parties, including Members of Parliament. Finally, Mr Chairman, I do not want to say much. Regarding road safety. Mr Chairman, perhaps the speed limit on this highway, which was briefly planned to be raised to 120 kmph, was later reverted to 110 kmph. However, what is more serious, Mr Chairman, is that because the highway from Seremban to Ayer Keroh has already become six lanes, I think that for road safety purposes the ministry should reconsider restoring the speed limit of the highway from Alor Gajah to Ayer Keroh to 110 kmph. Not like now, 90 kmph. I think in the present situation, many people are committing offences by breaking that speed limit, which is not logical at all given the condition of the highway, which is already at a level where vehicles can run up to 200 kmph. Imagine and compare 200 kmph with 90 kmph. At least 110 kmph, Mr Chairman. Mr Chairman, that is all from me and I support. Thank you.
Does the Honourable Member for Kepong wish to speak? The Honourable Member for Kepong. Okay, go ahead. Please.
This is about... This estimate of expenditure is thick. It is indeed thick. Regarding Item 080000 – Road Safety, Item 070000 – Railways, and Item 060000 – Land Transport. Here, I want to raise the matter of road safety. It seems that during the festive season, including Aidilfitri and also Aidiladha recently. Yesterday, was it not? Yesterday was Aidiladha, the big festival.
We see that the number of road accidents, even on ordinary roads, is no less. Every year we find more than 6,000 people killed in Malaysia, and more than 50 per cent of them are youths. Although we have Ops Sikap and so on, it is not very effective. In this programme we want to foster awareness and skills among vehicle users and road users to be disciplined in order to reduce the rate of vehicle accidents, deaths and losses resulting from accidents, and so on. Here I see that the awareness and skills of vehicle users have not improved. If we use the roads, we can see that the awareness is still lacking. I hope we can enhance this awareness. Regarding the Land Public Transport Commission (Suruhanjaya Pengangkutan Awam Darat, SPAD), I do not see that this body is able to carry out its work. Perhaps the ministry takes time to establish this commission, but the most important thing, for example, is in the Klang Valley and also in Kuala Lumpur. I see that the number of cars entering our city is still high. This means that less than 20 per cent of people entering Kuala Lumpur still do not use public transport, while more than 80 per cent still use their own cars. This certainly shows that the ministry's function must be improved to encourage more users to enter Kuala Lumpur through commuter, LRT, monorail and Rapid KL. Since Rapid KL in September, there has been a revamp and route changes, although the licences issued by the board have nothing to do with the ministry, but coordination, perhaps through the commission, must be improved.
We see that the revamp, changes or exchange of Rapid KL routes have affected many users. I hope the ministry can take note. Regarding railways and commuters, commuter services must be studied. I see there is a station at Taman Kepong, and not far from Taman Kepong station there is Kepong Central station. Not far, and at Kepong Central we certainly see there is a problem because there is MRR2 and traffic congestion there. Kepong Central station is located there, and I am puzzled as to why it was placed there? I hope the ministry can study how we can improve the services, although I am saddened because our railway track project from Rawang to Ipoh has caused controversy. I will not speak at length about the railway track because we in the PAC will study and investigate why this controversy over the railway track has arisen? Thank you.
The Honourable Member for Tenom. After the Honourable Member for Tenom, the Honourable Member for Petaling Jaya Selatan.
Thank you, Mr Chairman. I wish to debate Item 01400 concerning the Sabah State Railway Rehabilitation Project. Mr Chairman, Sabah also has a railway, for the information of the Honourable Member for Kuala Krau. Mr Chairman, I thank the government, which has so far provided such a large allocation to upgrade the railway in the state of Sabah, which has cost hundreds of millions. We see that when the government upgrades the Sabah state railway, it brings many benefits, especially to the areas involved such as my constituency in Tenom. My area is among the last stations where the railway stops. It starts from Tanjung Aru all the way to Tenom. However, Mr Chairman, I see that this problem is frequently raised, whether in the last Parliament sitting or previously, where the upgrading work on the Sabah state railway has often been problematic. Recently, as we know in this august House, we were informed that the contractors implementing these projects have been fined. But Mr Chairman, up until today I see that nothing has happened. I do not know which is untouchable, whether the contractors are truly serious in tackling this problem or the ministry itself, because I see that the work has been set in motion for a long time. If I am not mistaken, since before I became a people's representative, this matter has been going on for a long time, so we understand. Initially we were given briefings on the problems faced, but until today, although the company or contractor has been fined, the upgrading work is still delayed. I would like to know from the ministry what are the main reasons why this problem has remained outstanding? Is it because of allocation? Is it because of planning errors by the ministry, or is it negligence on the part of the contractor in carrying out the work? We see that today about 1.2 million tourists come to Sabah, generating approximately RM1.4 billion in 2006, and about 1.6 million came to Sabah, generating RM2 billion in 2009. Nearly two million people came. At the very least, when the upgrading of this railway is done, it is also one of the tourism products, firstly for rural areas, because in my area there are also places that can be visited by tourists who come to my place.
Mr Chairman, as I said earlier, I want to know what drastic action the ministry will take regarding this problem, because it has also been reported in the newspapers, such as the mobile raft trolley reported in the local press. We do not want all of this to happen, because we see that the history, or the railway service in the state of Sabah, is one of the historical legacies dating from the British period. So, as I said earlier, we hope the ministry will study this and take serious action to address this problem. I see that the affected areas, such as Pangie, Halorgilat and Rayoh, always hope that this railway service can be upgraded, because in these villages the railway is the only means of transport for them to get to Tenom town. Mr Chairman, imagine if something happened to them, a serious illness, or a villager who needs to give birth and must be taken to Tenom town. Would it not be miserable, would it not be terrible, Mr Chairman? So, I hope this matter will not happen again, and that the ministry will truly be able to address this problem. Mr Chairman, on one more matter, namely Item 060800 - Sabah Road Transport. This too is a problem that has yet to be resolved, Mr Chairman. I have raised the problem of PUSPAKOM many times, especially for us in the interior areas. The only PUSPAKOM in the district of Keningau, Mr Chairman, while the districts of Tenom, Nabawan, Kemabong, Sok and also Tambunan are feeders to the PUSPAKOM services in the interior areas. In the previous session too, I often mentioned how necessary it is for PUSPAKOM services to be deployed to the areas I have mentioned, because we see that most of the residents, or small planters in these areas, need PUSPAKOM services to inspect their vehicles. How difficult it is when vehicle owners have to go to great trouble to come to the district of Keningau. From my area alone, it is about 40 kilometres or more. Imagine the return trip, Mr Chairman. Not only do they have to spend more on petrol. Sometimes when they queue, the PUSPAKOM is full, and they have to go back and carry out the inspection on another day. So, we want, Mr Chairman, as I raised in the previous session, that the ministry also provide a mobile PUSPAKOM. If I am not mistaken, Mr Chairman, in the last term too, we heard the reply from either the Deputy Minister or the Minister, if I am not mistaken, at that time, who answered that a mobile PUSPAKOM would be provided. So, I greatly welcome that suggestion, but until today the mobile unit is not visible, the tyres are not visible, the trailer is not visible, what has happened to this? A problem. Is it because they are busy managing other matters, or because they are not managing the problems raised by us as people's representatives? We do not want this to happen, because the need for this PUSPAKOM is very important. First, it may help small planters or vehicle owners reduce their costs. Another point, Mr Chairman, recently I thanked the new Deputy Minister of Transport. When he was chosen and appointed to the post of Deputy Minister of Transport, the Honourable Member for Kudat immediately came down to my area, and at that time I raised only this PUSPAKOM problem, and he himself gave a strong commitment. I had written a letter to the Honourable Deputy Minister, and the Deputy Minister has done the work. The Deputy Minister has implemented the work.
What is unfortunate, Mr Chairman, is that I have obtained my own reply from the PUSPAKOM authorities in the state of Sabah, and they have decided to hold PUSPAKOM services in my area on a regular basis, whether once every three months, every four months or every six months, and they have asked the district administration, namely the district office, to find a site that can be used as a station when PUSPAKOM carries out its services. Unfortunately, Mr Chairman, although the district administration, the district office, has identified an inspection site as proposed, as was informed to me by the District Officer that at the Murut Cultural Centre there is a large area that can be used as a PUSPAKOM service centre, until today I have not seen it. This matter was announced by the District Officer that PUSPAKOM would come. Wait and wait, wait and wait, not even a trace of them is seen, Mr Chairman. This is very disappointing to us...
Request for clarification, the Honourable Member for Tenom.
Wait a moment, wait a moment. So, I see whether the ministry or the department itself is truly sensitive to the problems raised by us as representatives of the people. We do not want such matters to become a burden to us. Indeed, I believe and am confident that our government today truly gives a high commitment to the people, as in the slogan we hear, “Rakyat Didahulukan, Pencapaian Diutamakan.” We want all of this to be achieved better, Mr Chairman.
[Bangun]
Ya.
Thank you, the Honourable Member for Tenom. The weakness in the services provided by PUSPAKOM, I feel, exists not only in the Tenom area. Earlier I listened to the speech of the Honourable Member for Tenom, which clearly shows that although the public pays for PUSPAKOM services, PUSPAKOM does not give importance or priority to its services. Does the Honourable Member agree that the time has come when the vehicle inspection required by this government should not be monopolised by PUSPAKOM alone? Look at telecommunications companies: when there is competition, the public receives better services and cheaper charges. The problem with PUSPAKOM is because of monopoly. Does the Honourable Member agree that the time has come for us to abolish the monopoly, as proposed to the government?
Mr Chairman, I would like to interject. I would like to offer a little view and ask for the opinion of the Honourable Member from Tenom regarding PUSPAKOM. What is the view of the Honourable Member for Tenom, together with the view expressed by the Honourable Member for Batu Gajah? Could there come a time when the government, or the Ministry of Transport itself, realises that the monopoly and exclusive policy for PUSPAKOM has in fact already contradicted the government's policy to liberalise the services sector. That is, we know that the Prime Minister and the government under the new Prime Minister's leadership have announced the intention to liberalise and open up more space for the national services sector. One services sector in this country is workshop services and vehicle inspection, but the policy under which PUSPAKOM monopolises and holds exclusive power over this service in fact today contradicts the government's own policy. What is the Honourable Member's view?
Thank you, the Honourable Member for Johor Bahru, and also the Honourable Member. Indeed, I too feel that the views given by both Honourable Members are very suitable to our situation today. We want to create healthy competition, because we experience various problems when one party, one department, or especially PUSPAKOM, feels that they are already in a state that is known, if agreed, as a comfort, in a comfortable situation, comfort zone, without taking into account the interests of the people. This is the problem. So, Mr Chairman, I propose, taking into account the views of the Honourable Members just now, that the time has come for us to establish another one whose function is more or less the same, because we see that the purpose for which PUSPAKOM was established was not to burden the people. Moreover, Mr Chairman, if we look at my place in Keningau, I have made several visits. The waiting area, Mr Chairman, is even worse than the waiting area at a hospital, or worse than a taxi waiting area. It is very dilapidated and disappointing. How long has this situation existed? It has often been raised not only by me, but perhaps also by other Honourable Members. Therefore, I consider and agree with the views put forward by the Honourable Members just now, that the ministry, if possible, should create one more network, because we want competition that can help the rural community. Rural communities who own vehicles, for them, are an important asset. They use vehicles to transport agricultural produce. As an example, Mr Chairman, I often receive complaints from small planters who use their vehicles to transport agricultural produce. At one time, Mr Chairman, they earned only a small income after deducting petrol costs, tyre costs, small repairs, and including the cost of taking the vehicle to Puspakom. So, I hope the ministry will take drastic action, or a better study, a study carried out to restructure the role that the government has given to Puspakom. In the past we often heard about the problem of cut cars (kereta potong). But to what extent has this problem been overcome? It still happens, and how costly it is, Mr Chairman, if some of us buy without realising that the car is a cut car. We want all these problems to be overcome and for stricter action to be taken, because we do not want the purpose for which Puspakom was established to be solely for the interests of perhaps one person, the interests of third, fourth, fifth, sixth parties. So, Mr Chairman, I hope that for whatever matters I have raised, the ministry can take drastic, good and quick action, as demanded in the slogan of our leader, the Right Honourable Prime Minister, “Rakyat Didahulukan, Pencapaian Diutamakan.” Thus, Mr Chairman, I respectfully move support. Thank you.
[Bangun]
Yes, the Honourable Member for Petaling Jaya Selatan.
Thank you, Mr Chairman.
After the Honourable Member for Petaling Jaya Selatan, the Honourable Member for Johor Bahru.
There is only one matter I wish to touch on here. Item 010500 - Air Transport. I wish to refer to the operations of the AirAsia airline service. This is because some of its operations change suddenly, or without proper early notice, and this becomes a problem for passengers.
For example, the flight to Tien Jien, China, which began in April 2009, was cancelled temporarily from November 2009 to February 2010 on the ground of bad and cold weather there. The problem is that at the beginning, AirAsia made no official announcement and only announced it on Facebook. This case was reported in the newspapers. Why did AirAsia not make an official announcement about the cancellation of the flight to Tien Jien? Also, on the ground of bad weather, I think dirahsia, located in north China, is colder than China itself. This is not logical, because the suspension of the flight is for a period of three months. Has AirAsia used the aircraft for Tien Jien in place of flights to other places that are more profitable? Is the flight to Tien Jien less profitable? What compensation has been given to passengers who bought tickets for Tien Jien early on? AirAsia is also careless in providing a menu for passengers. Many food and drinks requested are not in the menu list, on the excuse that stock has run out. Most obviously, sometimes there is no mineral water, and passengers have to buy other drinks. How can a passenger who wants to take medicine do so without mineral water? On board the aircraft, passengers seem to be forced to buy food or drinks that do not suit their taste, because the choice of meals is limited. I suggest that AirAsia could follow in the footsteps of MAS by providing free warm water to passengers. Passengers should not have to pay RM4 to get one mineral water. I also want to know how AirAsia is working to improve its flight schedule, because many of its flights do not keep to the set time. Many flights are often late, by half an hour to one hour. How can this issue be improved? With regard to the existing LCCT airport, how does the ministry overcome the congestion problem at the LCCT airport, because the new LCCT airport will only be completed after two years. Within these two years, can the existing LCCT airport accommodate the increasing number of passengers? I think not, because the present situation is very serious. I hope the ministry can take drastic steps to overcome this problem. Thank you.
The Honourable Member for Johor Bahru, please. After Johor Bahru, Petaling Jaya Utara.
Thank you, Mr Chairman. I wish to continue from where the Honourable Member for Tenom left off, concerning Road Safety – Item 080000, which is specific to PUSPAKOM, but more to the matter of implementing the policy that the government has determined, namely in terms of an attitude and approach that I feel the Ministry of Transport should demonstrate in implementing the policies set by the government. It may be argued that our criticism of PUSPAKOM touches on policy. However, in my view, and I believe my colleagues agree, if a monopoly has been implemented for so long, it has already entered the implementation stage, and certainly more so when the government itself has stated that there must be a change in the government's own approach, not towards prioritising companies and investors but moving towards prioritising customers and the people. Here, PUSPAKOM, with its contract or its monopoly situation which has been extended by another five years, is an action that clearly contradicts the concept of competition and an open economy, and the liberalised state of the national services sector, and certainly it is an action, a situation, that we cannot simply allow to continue.
So even though this PUSPAKOM contract has been extended, I hope the Ministry of Transport will take into account the situation, where it runs contrary to the government's own policy, namely that service sectors such as workshops and vehicle inspection services should be used, since there already exists a capacity that is established and very widespread throughout this country. I believe a network of workshops could carry out inspections to ensure the safety of vehicles on the roads. Unfortunately, the same attitude is also visible at the Ministry of Transport. So, I myself asked a question about the jetties and ferry terminals built by the government, where these sea transport terminals are public facilities, but the Ministry of Transport's attitude is a very strange one. The Ministry of Transport is willing to spend government money, willing to incur losses and to spend government funds to control and maintain these public facilities, without considering a situation in which they allow excessive numbers of users, according to existing demand, from among ferry and boat operators. In fact, the government could earn profits, earn excessive income, to maintain these basic facilities. My question relating to the matter of the ferry terminal in the state of Johor, eventually at that time, if I am not mistaken, the answer was that the Ministry of Transport was considering and looking at how to grant approval to more than just one company permitted by the Ministry of Transport. Once again this reflects a way of thinking and an attitude that wants to give exclusive status to one particular company, whereas other operators are willing to take business risks by investing money to buy ferries worth millions of ringgit and are willing to compete among themselves. But because of the attitude of the Ministry of Transport in handling the responsibilities placed under this ministry, it is more inclined towards creating monopolies and exclusive companies for certain companies. They would rather not earn income and spend the people's money, the government's money, on maintaining these public facilities. Instead, if they opened up space for other ferry and boat operators to use the public facilities provided by this government, they would obtain returns that could reduce the burden on the government itself in maintaining these facilities. So, the attitude we see today, Mr Chairman, is that although it has been announced that the government at policy level wants to see this service sector liberalised and opened up to bring more competition so that customers and the people benefit, the Ministry of Transport's attitude seems to remain trapped in the past. I hope the Deputy Minister and also the ministry's officers can take serious action, which is truly sincere in following the policy, in implementing the policy that has been announced and put forward by our Prime Minister and this new government. Apart from that, Mr Chairman, I see the same attitude at KTM. I have been the Member of Parliament for Johor Bahru since 2004 and since then I have seen that there is a problem in terms of leadership attitude in KTM. They are willing to maintain the KTM line from Tambak to Tanjung Pagar in Singapore, which is in a foreign country, maintaining that line very well indeed, but on the other hand, the KTM line from Tambak Johor northwards has been left to become forest and scrub and has eventually become a den for drug addicts. In other people's country, we are willing to maintain our line because the foreign government decides and asks us to appoint contractors to maintain the KTM line well, but in our own state we say, "Ah, there is no one who will correct us." So, as a Member of Parliament, I have organised gotong-royong work to clean up the KTM line within the Johor Bahru Parliamentary constituency.
However, when I carried out this gotong-royong work to clean up the line, KTM said they would appoint contractors. So there also arose a press statement from the KTM Manager in Kuala Lumpur stating that in fact there was no problem, that the KTM line in Johor Bahru was clean, and that it was only because high-ranking officers do not like to go down to the ground, do not like to accept facts, and still have the attitude of a colonial mentality. I cannot accept this definition, unfortunately, because when we were colonised in the past, it was the colonial authorities who kept the KTM line clean.
At that time, one could play football, and the KTM line in Johor Bahru could be used for recreation. However, since we became independent, our attitude has not become more caring and loving towards the country or towards the people, but on the contrary has become more backward, to the point of allowing our own wealth in our own country to be left neglected like that. So, I hope the Honourable Deputy Minister will give a little reprimand or convey views to our new chairman who has become Chairman of KTM. In addition, Honourable Deputy Minister, if possible please also convey views to the ministry and to KTM, that there are lines that are our wealth, please take care of them as well as possible. So, that is all...
Interjection, Honourable Member, just a little, just a little. Regarding KTM before the Johor Bahru Member withdraws. I would like to ask for the opinion of the Honourable Member for Johor Bahru. Thank you, Mr Chairman. Regarding the attitude of companies under the government's GLCs, GLICs and so on. So, does this show a situation of not being serious or of a diligent work spirit, which should be displayed by the staff of companies under the government, including KTM, even because they feel that if they make losses, the government will give an injection or bailout to those companies? So, is it this culture that has caused what has happened that the Honourable Member described earlier?
Mr Chairman, I think the question of profit and loss is one that does not greatly affect the work of cleaning the line, or cleaning the toilets, or cleaning the stations, or cleaning or maintaining trains and other property. A loss remains a loss, but while making a loss, let it show an attitude of valuing or appreciating the assets owned by a company such as KTM or a corporation such as KTM. This is what is really the problem. I think if we all can accept that a company or enterprise such as KTM may make losses for certain reasons, because of conditions and technology that are not suitable, and so on, and the needs that raise the cost of capital expenditure, with your permission, Mr Chairman. However, in terms of the mentality and attitude we expect, which exists in the approach of officers who already hold high positions and are given high responsibilities, who are already exposed to various conferences, exposed to visit after visit, yet it still does not appear that protecting assets and property in the best possible condition is a responsibility that can be achieved even if our company makes losses, even if the corporation makes losses, even if the enterprise has to be borne by the government. So, that is why I think what is important is not that we announce a nice, perfect policy, but what is important is the willingness of our officers, those entrusted with responsibility, to do a little more, to change their way of thinking, to place a high value on and appreciate government property or corporation property or company property that has been entrusted to them in this field. I hope, Mr Chairman, that our colleague who is the Deputy Minister will be able to convey the feelings of Members of this House, not only from the government party, the ruling party, but also from the opposition, that we are deeply saddened by an attitude that is so far behind, by practising exclusivity that encourages monopoly.
In addition, they also continue to not place high value and price on the assets owned by government companies and corporations. Thank you, Mr Chairman.
I call the Honourable Member for Petaling Jaya Utara.
Thank you, Mr Chairman.
How long, Honourable Member? Because you just have five minutes. Can 10 minutes be finished? If 10 minutes can be finished, I can use the power under Standing Order 12.
15 boleh?
15 minutes is out of the question. Otherwise, you need tomorrow five minutes…, no use.
Continue tomorrow. Okay...?
10 minutes, yes.
Ya.
Or else continue tomorrow.
I cuba lah.
Okey, sila.
I'll try, yes. Quickly, then. Okay, first, there are only three matters I want to raise in the Ministry of Transport. The first concerns Development Purpose 28 - Study on Enhancing Existing Infrastructure. The matter concerned is the LRT Ampang line, which will be extended to Sri Petaling and Putra Heights, and the Kelana Jaya line, which will be extended from Subang Jaya, also going to Putra Heights. I would like to know what the current progress of this project is, and in the budget that I have examined and tried to find in detail, I did not get any information regarding this project or any specific expenditure for this project in 2010. So, I do not know whether this project will be maintained, such that in 2012 it will certainly be commissioned and ready to run, or whether this project will be postponed once again to future years, because if no money has been allocated to carry out this project, then there is certainly no money for this project to proceed. I know that it is now at the public feedback stage, and the public feedback on the line, the places provided for the route, have been displayed in several places including DBKL, MPPJ and other places. However, in my area there are residents who have already received notices. Residents who have received notices that their land and their houses will be taken over by the government for this project extending the LRT line to the places I mentioned just now. Suppose consultation has not finished, has not been completed, and this line has not been finalised, its route has not been finalised, why has the government already taken steps to acquire the land concerned? I find it puzzling, because my residents in the Taman Mega Mas area have already complained to me about why this has happened before the line has been finalised. I would also like to know whether local authorities, including MPPJ and MBSJ, will be consulted regarding the road alignment that will be involved in this matter. This is because I understand there is also an exchange of state road alignment to be made by Syarikat Prasarana Negara, which as far as I know has not yet been approved by the local authorities. So, what consultations will be carried out by the government and also the local authorities.
I want to ask about a slightly broader matter, regarding a single fund, RM35 billion, which was announced by the former Right Honourable Prime Minister last year to maintain the public transport system in Malaysia. RM35 billion was announced and it became a headline in our newspapers. I have read carefully once again, the Ministry of Transport, the Ministry of Finance, the Prime Minister's Department, and I do not see anywhere any amount close to the RM35 billion that was used from 2009 until 2014. If divided, even on average, each year there would be at least about RM5.8 billion. However, the problem is that in this year's budget, as far as I can calculate, and as far as I can see, not even RM1 billion has been allocated to upgrade the public transport system, including the railway system, commuters, LRT, buses and so on. I do not see the amount exceeding RM1 billion. So, I want to ask where the RM35 billion that the government promised in last year's budget has gone. Has this RM35 billion disappeared, or has it been converted to other matters, or does it still exist but has not yet been used? Oh, it is already 10.30. Let me finish public transportation first. Finally, for public transportation, the Cheras to Kota Damansara line. This matter was also announced by the government about one or two years ago. What will happen to this project, because for now there seems to be no progress and it will not be carried out by the government. So, this is my question on this matter regarding public transport. Mr Chairman, may we continue tomorrow?
Okay, so you have another, say, 5 minutes. I know he wants to look for more ideas tonight... [Laughter] The House resumed [Mr Speaker in the Chair]
Honourable Members, the House is adjourned until 10 am on Tuesday, 1 December 2009. Thank you. The House was adjourned at 10.32 pm.