Dewan Rakyat · 24 November 2010

15th Parliament, session 3, meeting 3 · 814 turns · 49,306 words · official PDF ↗ · Digital Hansard ↗

701 of 814 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Datuk Ronald Kiandee) chaired the Meeting]

Oral Answers to QuestionsQuestions

Alexander Nanta LinggiPBB · GPSKapit · questionEN

1. Datuk Alexander Nanta Linggi [Kapit] asked the Prime Minister to state the extent to which the NKRA and GTP have been implemented. Please explain what problems or obstacles have been encountered in efforts to implement them.

Tan Sri Dr. Koh Tsu KoonMinister in the Prime Minister's DepartmentEN

Mr Speaker, greetings of 1Malaysia to you as well. Since it was launched in January this year, it has been coordinated and driven by, with permission, the Performance Management and Delivery Unit (PEMANDU) under the Prime Minister's Department, and it has been actively pursued by all the relevant ministries and agencies. The Government Transformation Programme (GTP) has produced many positive effects for the six National Key Result Areas (NKRA), as has often been reported through the mass media. In general, guided by the commitment to prioritise achievement so that the people come first based on the 1Malaysia concept, the GTP has also produced improvements, changes and reforms to our public service, as I will summarise briefly. First, the GTP has further enhanced the culture of excellence through the use of performance management methods such as Key Performance Indicators (KPI) and Delivery Labs (LAB), which have been proven effective and productive. Now more civil servants have become more aware and more committed to performance so as to bring about large and meaningful results for the people. The pursuit of excellence, or, with permission, the pursuit of excellence, has been intensified through competitive ranking processes: all police stations under the NKRA reducing crime, and all schools under the NKRA raising the quality of education; those at the top level are rewarded and recognised. Meanwhile, those at the lower level are given assistance and encouragement to improve their respective performance. Second, the lab method has successfully broken down barriers and built bridges of closer cooperation and coordination among the relevant ministries and agencies. For example, under the NKRA to improve the quality of life of low-income households, which is led by the Ministry of Women, Family and Community Development and assisted by the Implementation Coordination Unit (ICU), several other ministries have cooperated to implement the 1Azam scheme to further enhance the economic capacity of poor household members, where the Ministry of Human Resources manages 1Azam

Tan Sri Dr. Koh Tsu KoonMinister in the Prime Minister's DepartmentEN

Kerja. The Ministry of Agriculture and Agro-based Industry, 1Azam Tani and so on. Third, this focused and cooperative approach is the result of a very thorough driving and monitoring process in which every Minister leading an NKRA chairs weekly meetings at their own ministry level. PEMANDU, meanwhile, holds weekly meetings to help resolve management problems that arise, and the Honourable Deputy Prime Minister himself chairs the Delivery Task Force (DTF) for each NKRA every month. Fourth, the GTP has also taken into account the views and feedback of the people through participation in the labs, open days and also in the implementation process. For example, the NKRA to reduce crime not only mobilises more police personnel to high-risk areas but also RELA and JPA members who are trained to carry out patrols alongside police personnel, as well as voluntary patrol schemes in areas of neighbourhood associations (rukun tetangga). As a result, the crime rate has fallen by 16% overall and street crime, including snatch theft, has fallen by 37%.

Tan Sri Dr. Koh Tsu KoonMinister in the Prime Minister's DepartmentEN

Mr Speaker, in addition to the six NKRA, the GTP also implements what is known as the ministerial KRA and NKPI for all Ministers. Therefore the GTP is indeed the largest government transformation effort ever implemented by any government, because of the involvement of so many agencies and so many civil servants. It has indeed faced some initial problems, or teething problems, in the first year, such as coordination between agencies that is still not sufficiently tight in certain projects, databases that are still not fully perfect, the level of internalisation among civil servants that is still not uniform because the GTP requires changes in mindset and work relationships, and in addition there are common implementation problems, for example land acquisition, resettlement of the squatters involved and so on. However, the government is confident that these problems and shortcomings can be overcome and the GTP will certainly succeed. Thank you.

Thank you, Mr Speaker. Thank you to the Honourable Minister for a long and comprehensive answer, though it was not brief at all. Mr Speaker, regarding this GTP, the Government Transformation Programme, in my view this GTP should be implemented covering all governments, namely the Federal Government and state governments. Can the Honourable Minister explain or list the names of the states that have complied and given the best cooperation in implementing this programme, and which states have not. What about the states governed by opposition parties? Do they cooperate with us in this programme? Regarding the NKRA, there are several projects that are very much needed by the people, such as roads for example in my constituency in Kapit, linking Bandar Kapit, Bandar Song, Bandar Kanowit and also going all the way to Sibu, as I have often mentioned in this House. It was announced that projects under the NKRA programme would be implemented, but now we have not yet seen anything with regard to the status of its implementation at the grassroots

level. Perhaps this is rather specific, I ask for an explanation in writing, later. My question is whether all the projects said to be in the NKRA programme have a date or period set for their completion – dateline for the completion of the project under NKRA. Because overall the people very much welcome and accept the 1Malaysia concept, 'rakyat didahulukan, pencapaian diutamakan'. That is all, thank you.

Thank you, Honourable Kapit. For the first question, I would like to explain here that almost all state governments have cooperated, especially state governments under Barisan Nasional. It is therefore in the interest of state governments, under whichever party, to cooperate with the Federal Government to make the GTP programme a success. For the second question, the specific projects at the grassroots level have indeed been identified, but their implementation will take time. For example, most of the projects for this year 2010 have been identified and included in the 2010 budget. Because the NKRA labs were held at the end of 2009, there are also some new projects that were not in time to be included in Budget 2010 but have been included in the supplementary budget 2010, which was also approved by this august House. For the year 2011, the projects have indeed been included in the 2011 Budget and further for 2012. In fact we have taken a three-year period as the first phase to implement these six NKRA under the GTP. Thank you.

Puan Chong EngDAP · PRBukit MertajamEN

Thank you, Mr Speaker. The NKRA and also the National Transformation Plan, I think it must also cover women in this country. However, I do not know whether in this NKRA, wherever it is, it also includes women as an index of measurement to determine whether this transformation includes women. Is Gender Mainstreaming also used as an index, and if not, how can we measure that this transformation does not sideline women, who at present are already left behind. So, I ask for an explanation.

Thank you, Honourable Bukit Mertajam. I do not agree that women have been sidelined in our country. I really do not agree because the Honourable Member herself sits at the front. In several professions, for example teaching, more than 65% are indeed women. Likewise, students at institutions of higher learning are mostly female students. This is a good sign which is indeed welcome. For the GTP, it indeed takes everything into account based on the 1Malaysia concept, where we have very clearly stated that inclusiveness is a main principle and commitment, namely that we do not want to neglect any group, whether ethnic, cultural, religious or gender. Therefore, under the NKRA, to improve low-income households, attention has indeed been given to developing women entrepreneurs through a special programme run by the Honourable Minister concerned. Therefore, Honourable Bukit

Mertajam need not be worried, but what is needed is to give full support to make this programme a success. Thank you.

Teo Nie ChingDAP · PHKulai · questionEN

2. Puan Teo Nie Ching [Serdang] asked the Minister of Housing and Local Government to state whether the ministry intends to amend the law to give greater powers to the Joint Management Body (JMB) or the Management Committee to collect maintenance charges that are owed.

Datuk Seri Panglima Haji Lajim bin Haji UkinUMNO · BNDeputy Minister of Housing and Local Government · BeaufortEN

Mr Speaker, for the information of Honourable Members, the Ministry of Housing and Local Government is of the view that the existing legal provisions under the Building and Common Property (Maintenance and Management) Act 2007 [Act 663] are adequate for the purpose of collecting maintenance charges and arrears. These powers are provided under section 32 of Act 663 and section 33 of Act 663. Under section 32 of Act 663, the Joint Management Body (JMB) has already been given the power to collect outstanding maintenance charges by issuing a demand notice to the parcel owner. If the parcel owner does not make payment within 14 days of the period of the notice given, the JMB may take court action against the parcel owners concerned. Apart from that, section 33 of Act 663 also gives power to the JMB to apply for assistance from the Building Commissioner (Pesuruhjaya Bangunan) or COB to issue a payment notice and take action to seize movable property against parcel owners who still do not make payment. The movable property of a defaulting owner may be sold by public auction to cover the arrears of the parcel owner's charges. Thank you.

Puan Teo Nie ChingDAP · PHSerdangEN

Thank you, Deputy Speaker. My supplementary question. I disagree somewhat with the Deputy Minister because I think nowadays every day or every week we can see news where there are apartment owners who do not pay their maintenance fees, until TNB or SYABAS come to cut off water and electricity. I understand that under the current law, JMBs have power to take legal action against those who do not pay. However, I want to ask here, if the JMB cannot collect the maintenance fees from house owners, then how do they have the financial capacity to bring that person to court. I also want to ask, although there is already a law here, up until today does the ministry have a record of how many people have been brought to court under this section. If there are none or not many people who have been brought to court under this section, it means this section is less effective. So, I ask the ministry to please pay attention to this issue because I think many people living in apartments and condominiums now pay but they are troubled because many others still do not pay. That is all, thank you.

Thank you, Honourable Serdang. Before I answer the Honourable Member's supplementary question, may the Honourable Member give a direction on how to solve this problem. If the Honourable Member can give a direction, we will also make efforts or take action as in the Honourable Member's argument. The winding-up of the Honourable Member...

Puan Teo Nie ChingDAP · PHSerdangEN

In that case let me be the government then.

[Ketawa]

Deputy Speaker (Datuk Ronald Kiandee)

Yang Berhormat.

You join Barisan Nasional lah, then can become government.

Itu bukan you punya floor, my floor.

Deputy Speaker (Datuk Ronald Kiandee)EN

Others, don't interfere, Honourable Member. Sit down.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

I have a suggestion.

No... No... No.

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Ipoh Barat.

I ask that if opposition Members can also give good input to the ministry, there is no problem.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

We always give input.

It’s no problem.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

No, no. I can give a suggestion Yang Berhormat Timbalan Menteri.

Deputy Speaker (Datuk Ronald Kiandee)EN

Yang Berhormat, Yang Berhormat.

No, no. Please, please!

Dato’ Ngeh Koo HamDAP · PHBeruasEN

One best way...

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Honourable Member, when the Honourable Deputy Minister asks...

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Ipoh Barat.

Tuan M. KulasegaranDAP · PHIpoh Barat

Memberi pandangan, when he asked for opinion, kita boleh bagi.

Honourable Ipoh Barat or others...

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Beruas, please sit down, Honourable Member.

I asked whether there is any party from the Honourable Member for Serdang...

Tuan M. KulasegaranDAP · PHIpoh Barat

[Menyampuk]

There is also a suggestion to overcome this problem, what problem? However, the JMBs were actually established under Act 33, 32, 33, 663 and the JMB has powers. However, cutting off water and electricity is within their area of authority. For the Honourable Member's information, in 2009 and 2010, 235 persons have already been brought to court. Action has been taken and we will await the outcome of the trial regarding those who failed to pay the rent of these parcels. These are the steps we have taken, and for the Honourable Member's information, those who do not pay are actually, first, people who deliberately do not pay. Second, I also do not blame parcel owners because the JMB service is not good. It is true that we received complaints from 2009, 10,640 complaints that we received, and in 2010 from January until 30 June, we received 7,174 complaints received by the ministry. We have forwarded them to the JMBs concerned to take action. Thank you.

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Putatan.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Thank you, Deputy Speaker. This is because this is the kind of question I have been waiting for.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Menyampuk]

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Honourable Ipoh Barat, please let him/her.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Give the answer to the Deputy Minister.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Don't waste time. First, I would like to thank the ministry for its efforts, which is work that is not easy to carry out. Congratulations to the ministry. I would like to ask about a case where a similar management corporation has not fulfilled its role and duties as a management corporation. This has been reported by TV3 and involves Tuan Karam Singh too, my constituency. So, I want to know what the role of the central ministry is regarding what has happened if there are offences involving this management corporation at the state level in Sabah. This is because at the state level there are its own laws. So, this is a national issue and an issue of the SPNB project which indirectly involves the ministry from the Centre. This is a management or management at housing level that is not carrying out its duties as expected. This is because there are many complaints, especially that these terrace houses are cracked, the grass is not cut, rubbish is not collected, there is no fencing and so on. The residents there... [Interjection] Be a little quiet, otherwise the Honourable Minister will not hear. If you want to speak, stand up, I will give way.

[Ketawa]

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Honourable Ipoh Barat, be quiet. So I ask for an explanation from the ministry, what is the role of the central ministry if there is a failure by the state government. I want to know because I hope my voters who brought this matter to the central ministry. Please explain.

Nampaknya...

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Taman, Taman Ketiau.

It seems the Honourable Putatan also wants to ask.

[Interjection] I have asked, I want to ask then.

Actually, there are two differences between the JMB and the MC. The MC refers to buildings that have strata title. So for these provisions, the MC will elect its committee at the housing level itself and determine the actions and also the charges that must be imposed on those who will live in that area. So if the ministry receives complaints, we will forward them to the MC and also to the state, the local authority to take action. So, under section 663 also and under 32 and 33, section 663, Act 663 also has powers over the MC. If the Honourable Member receives complaints from the residents – which estate?

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Taman Ketiau, Putatan, and I have handed over that report to the Honourable Minister, the ministry itself.

However, before it reaches me, pass it to the state level first, because the management at state level is also accountable to the state or the relevant ministry. Thank you.

Azalina binti Othman SaidUMNO · BNPengerang · questionEN

3. Dato' Sri Azalina Dato' Othman Said [Pengerang] asked the Minister of Home Affairs to state the measures taken regarding the issue of foreign immigrants who are increasingly flooding this country, causing various problems such as crime and social issues, and whether the government practises a policy of equality in employment between local residents and foreign immigrants.

Dato’ Lee Chee LeongMCA · BNDeputy Minister of Home Affairs II · KamparEN

Deputy Speaker, thank you to the Honourable Pengerang for raising the question. Allow me to answer this question together with the question by the Honourable Bukit Bintang dated 25 November 2010, question number 39, and the question by the Honourable Ampang dated 14 December 2010, question number 18. This is because those questions concern the same matter.

Deputy Speaker (Datuk Ronald Kiandee)EN

Very well, Honourable Member.

Dato’ Lee Chee LeongMCA · BNKamparEN

For the information of the Honourable Members, the government has identified that the presence of foreign nationals in Malaysia is generally based on the following purposes of entry. First, entering Malaysia legally for social visits, such as for tourism and to visit relatives who are in this country, and entering Malaysia legally for the purpose of working. Mr Speaker, Malaysia welcomes the arrival of foreign nationals visiting this country. Accordingly, no drastic measures can be taken by the ministry to address the entry of legal foreign nationals into this country. In line with the country's policies

Dato’ Lee Chee LeongMCA · BNKamparEN

such as the Tourism Policy, which makes the country a regional education hub and promotes tourism, health and others. Nevertheless, among the government's efforts to control the presence of foreign nationals, and being aware of social ills and crime, it has implemented integrated enforcement operations between the Royal Malaysia Police, the Immigration Department of Malaysia, the Malaysian People's Volunteer Corps and local authorities on an ongoing basis to detect, arrest, prosecute and deport foreign nationals who violate the provisions of the country's laws.

Dato’ Lee Chee LeongMCA · BNKamparEN

In this regard, the Immigration Department of Malaysia has carried out a total of 4,748 operations up to September 2010. During the same period, a total of 25,553 arrests were made. With regard to the question raised by the Honourable Member for Pengerang, namely whether the government practises a policy of equality in services between local residents and foreign immigrants: the government does indeed practise a policy of inequality in certain services, such as hospitalisation services, where foreign workers are charged certain fees. Another example is in terms of employment opportunities for permanent posts in the public service, which are reserved only for Malaysian citizens. However, in matters relating to security, the government does not differentiate between citizens and non-citizens. Any person who commits an offence in the country will be dealt with without discrimination based on citizenship status. Thank you.

Thank you, Honourable Member for Kampar. My next question is: to what extent has the Ministry taken measures to control the entry of foreign immigrants who misuse visit passes to work in our country? Thank you.

Dato’ Lee Chee LeongMCA · BNKamparEN

Mr Speaker, for the information of the Honourable Member, the Immigration Department of Malaysia has a mechanism to control the entry of foreign immigrants who misuse visit passes issued for work in this country. Firstly, foreign immigrants who have been issued any pass but misuse that pass: if caught, they will be charged, convicted and deported, and that information will be entered into the suspect list system which can be accessed by immigration officers at the entry points. Secondly, regarding the re-entry into Malaysia of the Temporary Work Visit Pass (PLKS) holders, every foreign worker is given a cooling-off period of 3 months. That is all, thank you.

Deputy Speaker, (Datuk Ronald Kiandee)EN

Honourable Member for Tawau.

Tuan Mohamed Azmin AliPKR · PHGombakEN

Both are BN, how is this?

Deputy Speaker (Datuk Ronald Kiandee)

BEBAS lah.

Datuk Chua Soon BuiSAPP · BNTawau

Soalan tambahan.

Datuk Raime UnggiUMNO · BNTenomEN

That one is BEBAS lah.

Tuan Mohamed Azmin AliPKR · PHGombakEN

I stood up first, Mr Speaker. I stood up first.

Deputy Speaker (Datuk Ronald Kiandee)EN

No, Honourable Member.

Datuk Raime UnggiUMNO · BNTenomEN

Action lah, action.

Tuan Khairy JamaluddinUMNO · BNRembauEN

He is BEBAS. This one just won the Deputy President post. Just won.

Tuan Mohamed Azmin AliPKR · PHGombakEN

I stood up first.

Tuan Khairy JamaluddinUMNO · BNRembau

Please, respect The Speaker.

Tuan Mohamed Azmin AliPKR · PHGombakEN

The Honourable Member for Rembau is far away.

Tuan Khairy JamaluddinUMNO · BNRembauEN

Deputy President, please sit down for a moment.

Tuan Mohamed Azmin AliPKR · PHGombakEN

Mr Speaker, I have stood up three times, Mr Speaker.

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Member, please sit down, Honourable Member.

Dato’ Lilah bin YasinUMNO · BNJempolEN

Only now do we know he is not qualified to be Deputy.

Datuk Chua Soon BuiSAPP · BNTawauEN

Thank you, Mr Speaker.

Deputy Speaker (Datuk Ronald Kiandee)EN

Yes, please, Honourable Member for Tawau.

You are standing in front, can you see behind? The Honourable Member for Tawau at the back stood up first.

Tuan Mohamed Azmin AliPKR · PHGombakEN

Mr Speaker, point of order. [House in uproar]

Datuk Abd. Rahman BakriUMNO · BNSabak BernamEN

Judging by the style, not fit to be a leader like this.

Don't create problems!

Tuan Mohamed Azmin AliPKR · PHGombakEN

Under the Standing Orders, the first Honourable Member whom Mr Speaker sees should be given priority.

Deputy Speaker (Datuk Ronald Kiandee)EN

Yes, the one Mr Speaker saw.

Tuan Mohamed Azmin AliPKR · PHGombakEN

Mr Speaker, can you not see me? I am the closest to Mr Speaker. The Honourable Member for Tawau is far away.

Deputy Speaker (Datuk Ronald Kiandee)EN

That's enough, Honourable Member.

Dato’ Lilah bin YasinUMNO · BNJempolEN

Perhaps Mr Speaker is short-sighted up close.

Deputy Speaker (Datuk Ronald Kiandee)EN

I think this matter... Please, Honourable Member for Tawau.

Datuk Chua Soon BuiSAPP · BNTawauEN

Yes, thank you. Mr Speaker, supplementary question. Although with some of the actions promised and taken by the Ministry previously, we have not been able to see a very effective impact, because many undocumented foreign immigrants still slip through the border, especially in Sabah. How does the government intend to control and tackle the entry of undocumented immigrants who enter

Datuk Chua Soon BuiSAPP · BNTawauEN

the country illegally? What drastic or effective control measures are there to prevent the entry of these groups? What is the outcome of the laboratory research on undocumented foreign immigrants in Sabah? Thank you.

Dato’ Lee Chee LeongMCA · BNKamparEN

Mr Speaker, to tackle the illegal entry of foreign nationals, the measures taken include tightening controls and inspections at the country's entry points. Secondly, increasing surveillance along the country's coastal waters, namely in areas that have been identified as landing and entry points for PATI (undocumented immigrants). This is done with the cooperation of the Marine Police, the Royal Malaysian Navy and the Malaysian Maritime Enforcement Agency (MMEA). However, this is not an easy matter given the country's very large land and sea borders. Regarding the question on the laboratory for PATI in Sabah, Mr Speaker, the Cabinet Committee on Foreign Workers and Illegal Immigrants has decided to hold a foreign management laboratory, including the state of Sabah, which was held this year. Through this laboratory, several initiatives have been proposed, which are steps towards managing the presence of foreign nationals in Malaysia more effectively. Thank you.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Thank you, Mr Speaker. Supplementary question. Mr Speaker, Kuala Lumpur now appears to be tainted by the arrival of foreign immigrants from places such as Myanmar, Vietnam, Africa and others, to the point where city folk are afraid to go out of their homes at night in some places, because they like to fight, get drunk and so on. On holidays, they loiter at KLCC and complexes like a gang. I would like to ask, why has the ministry not taken action or monitoring to ensure that they do not tarnish the good name of our country? Has the ministry set up a special unit to monitor that these foreign immigrants do not frighten tourists or legal foreign immigrants, and that local people are not tarnished or intimidated by them, so that they do not come out to the complexes because they hang around there in large groups like a gang? I ask for an explanation from the Honourable Deputy Minister. Thank you.

Dato’ Lee Chee LeongMCA · BNKamparEN

Mr Speaker, the government does indeed have a mechanism to control foreign immigrants. As I answered earlier, the Cabinet Committee on Foreign Workers and Illegal Immigrants has decided on a foreign nationals management laboratory this year. Through this laboratory, several initiatives have been proposed, which are steps to manage and monitor the presence of foreign nationals in Malaysia more effectively.

Dato’ Lee Chee LeongMCA · BNKamparEN

The measures that have been considered include: (i) private higher education institutions (IPTS) must report all changes concerning each foreign student in terms of place of study, course followed, student failures, student residence, and carry out monitoring of their movements; (ii) employers are required to report foreign workers who abscond and whose work permits have expired;

Dato’ Lee Chee LeongMCA · BNKamparEN

(iii) increasing the frequency of enforcement operations in hot spot areas to reduce the smuggling activities of data by foreign nationals; (iv) employers must give priority to recruiting local citizens for work before employing foreign workers; (v) registering school leavers with Job Malaysia. (vi) increasing fines for offences of violating pass conditions under regulation 39(b) of the Immigration Regulations 1963 from RM1,000 up to RM50,000; (vii) strengthening the computerised systems used as monitoring systems as follows:- (i) one passengers screen system; (ii) non-citizen tracking system; (iii) introducing a non-citizen recruitment exchange system; and (iv) fourthly, improving the Immigration Department of Malaysia's system.

Wan Abdul Rahim bin Wan AbdullahPAS · PRKota Bharu · questionEN

4. Dato' Haji Wan Abd. Rahim Wan Abdullah [Kota Bharu] asks the Minister of Plantation Industries and Commodities to state the number of smallholders of rubber and oil palm across the country, and the value of output they contribute to GDP compared with the estate sector.

Dato’ Hamzah bin ZainudinBERSATU · PNDeputy Minister of Industry, Plantation and Commodities I · LarutEN

Thank you, Mr Speaker. In 2009, the number of rubber smallholders was 400,493 persons with a total area of 827,061 hectares. The rubber commodity as a whole contributed RM5,667 million, or 1.08% of gross domestic product (GDP). Out of the RM5,667 million, the contribution of rubber smallholders to GDP was RM1,638 million or 0.31%. The number of oil palm smallholders in 2009, on the other hand, was 354,612 persons with a total area of 1,225,113 hectares. The oil palm commodity as a whole contributed RM16,682 million, or 3.2% of GDP. Out of RM16,682 million, the contribution of smallholders to GDP was RM3,180 million or 0.61%. Thank you.

Mr Speaker, such a large number of smallholders make very significant contributions, especially rubber smallholders, and some of them depend on workers who come from Thailand, particularly in the northern states. The relationship between the people of northern Malaysia and Thailand has been established for a very long time, in socio-economic and family terms and so on. In the 1950s, many workers from Kelantan, Kedah, Perlis and Perak migrated to tap rubber on the Thai side, and now, during this season of such high rubber prices, many workers from Thailand come to tap rubber on the Kelantan side and in the northern states. In the past, the government allowed

these workers to use visit passes, and once they entered they were permitted to be present in Kelantan and Malaysia for one month. However, now the immigration authorities have restricted that entry from one month to only 14 days. The government should allow and extend it from one month to three months. So, is the ministry aware that this action by the immigration authorities limits the need for manpower and also creates difficulties for the parties concerned who want to come and help work tapping rubber on this Malaysian side? Thank you.

Dato’ Hamzah bin ZainudinBERSATU · PNLarutEN

Thank you, Honourable Member. What the Honourable Member has raised actually falls under the purview of another ministry. However, I would like to tell the Honourable Member that what we want to help is smallholders, because for their benefit, we provide various new technologies, and they can use local youths whom we are now teaching, giving them training to produce better output. Therefore, because of the social problems in our country, we are trying to reduce the use of foreign workers in the country, so this problem does not really arise, Honourable Member. Thank you.

Tuan Khairy JamaluddinUMNO · BNRembauEN

Thank you, Mr Speaker. First of all, I would like to extend my congratulations to my friend, the Honourable Member for Gombak, for being crowned Deputy President. I could not wait to ask my question earlier, to test his power.

Tahniah...

[Speaking without using the microphone]

Tuan Khairy JamaluddinUMNO · BNRembauEN

A question to the Deputy Minister. I congratulate the government's efforts to safeguard the interests of smallholders and to increase their output. One of the government's proposals is to establish clustered estates. So my question is, how effective is the clustered estate programme, which in my view is only practically effective when planting takes place in one place and in a newly opened area? What other approaches are there to help those who are not included in clustered estates, including cooperative methods and so on? Thank you.

Dato’ Hamzah bin ZainudinBERSATU · PNLarutEN

Thank you, Honourable Member for Rembau. What is the difference between the Chief of the Barisan Nasional Youth and the deputy president? [Laughter] [House in uproar]

Tuan Mohamed Azmin AliPKR · PHGombakEN

I could not ask a question.

Dato’ Hamzah bin ZainudinBERSATU · PNLarutEN

Okay. [House in uproar]

[Speaking without using the microphone]

Dato’ Hamzah bin ZainudinBERSATU · PNLarutEN

Mr Speaker, what the Honourable Member for Rembau has raised is something we are indeed carrying out. The government does want to help in various ways to provide assistance to smallholders. Through the clustered estate programme, which is a new programme for us, it makes things easier in terms of their productivity, so that when output is produced, it can be assisted more easily in terms of its production. For those who cannot join this clustered estate programme, the government also helps in another way, namely

Dato’ Hamzah bin ZainudinBERSATU · PNLarutEN

through agencies located near the area. So it is not a problem for smallholders. If they want assistance from the government, they can look at the government agencies near them in that area. Thank you.

Matulidi bin JusohUMNO · BNDungun · questionEN

5. Tuan Matulidi Jusoh [Dungun] asks the Minister of Domestic Trade, Cooperatives and Consumerism to state whether the government intends to expand the 1Parlimen 1Koperasi (One Parliament One Cooperative) programme for controlled goods wholesalers in all parliamentary constituencies, to ensure that controlled goods can be distributed throughout the country.

Dato’ Tan Lian HoeGERAKAN · BNDeputy Minister of Home Affairs, Cooperatives and Consumerism I · GerikEN

Thank you, Mr Speaker, and thank you to the Honourable Member for Dungun for raising this question.

Dato’ Tan Lian HoeGERAKAN · BNDeputy Minister of Home Affairs, Cooperatives and Consumerism I · GerikEN

Greetings of peace and 1Malaysia greetings. Mr Speaker, in order to stabilise the prices and supply of goods, especially controlled goods, the government has indeed agreed to expand the 1Parlimen 1Koperasi programme for wholesale and retail of controlled goods in all parliamentary constituencies, to ensure that controlled goods can be distributed throughout the country. Thank you.

Tuan Matulidi JusohUMNO · BNDungunEN

Thank you, Honourable Deputy Minister, for the answer given earlier, and I congratulate and commend the government for taking proactive steps to ensure that controlled goods can be distributed throughout the length and breadth of the country, including rural areas. My supplementary question: what measures does the government take to ensure that wholesalers and distributors of these goods do not manipulate prices or arbitrarily raise the prices of goods, so that prices remain at the set level, even in rural areas? In the context of encouraging the establishment of wholesale cooperatives by parliamentary constituency, to what extent has the government succeeded in implementing this 1Koperasi 1Komuniti (One Cooperative One Community) programme to support the wholesale cooperative programme by parliamentary constituency?

Dato’ Tan Lian HoeGERAKAN · BNGerikEN

Thank you, Honourable Member for Dungun. To ensure that the supply of these controlled goods reaches rural areas at the prices set by the government, the Ministry of Domestic Trade, Cooperatives and Consumerism (KPDNKK) has already started a cooperative programme as wholesalers beginning this year, namely 2010, and it is being implemented in stages, state by state first. So far, it can be said that every state except Johor already has wholesale cooperatives. We will implement it before reaching the parliamentary level first. So far, up to 23 November 2010, KPDNKK has received a total of 76 applications from cooperatives interested in becoming wholesalers of controlled goods, although 34 applications have been approved wholesale licences and 11 applications we have rejected, and the remaining 31 applications are still under review based on the set criteria. This is because we know that, to ensure that these cooperatives are able to distribute, they must meet several criteria that we have looked at, the first being ensuring that the cooperative has a strong financial position. This is because we know that most controlled goods involve cash purchases.

Dato’ Tan Lian HoeGERAKAN · BNGerikEN

To ensure supply, then – we will look at cooperatives that have cash flow, and good records and financial management, to avoid supply disruption arising from a lack of capital at wholesaler level to obtain supplies from factories. Likewise, we will look at transport facilities and storage warehouses. These transport and storage facilities are very important so that the cooperative has these facilities to deliver controlled goods quickly. Likewise, we will look at their core business, where the core business of the cooperative is proposed to be taken into account in approving applications, where a cooperative that runs a retail business and has existing economic activity, as well as those who genuinely want to run a wholesale business, are proposed to be considered. To ensure that controlled goods are not manipulated, the ministry from time to time carries out monitoring through price monitoring officers and also our enforcement officers. In this regard, we also wish to inform that the public and consumers themselves must also cooperate with the government by reporting to the ministry if there is any manipulation among wholesalers. Thank you.

Tuan Abdullah Sani Abdul HamidPKR · PHKuala LangatEN

Thank you, Mr Speaker. Focus on the controlled goods question. Supplementary question. Subsidy smuggling activities of late are extremely worrying. The losses recorded are also not a figure that can be taken lightly. Sources from KPDNKK show that 10 cases involving misuse of fishermen's subsidised diesel were recorded, involving the seizure of 58,449 million litres of diesel worth RM73,000. The question is, what steps have been taken by the ministry to tackle these illegal activities seriously? [House in uproar]

Dato’ Tan Lian HoeGERAKAN · BNGerikEN

Okay. Thank you, Honourable Member, for this supplementary question. The government indeed takes the abuse of subsidies given to the people seriously. Therefore, the government, through the Ministry of Domestic Trade, Cooperatives and Consumerism (KPDNKK), has in fact been monitoring from time to time and has also carried out various seizures against irresponsible parties, where many goods have been seized, whether diesel or sugar. The sugar is usually smuggled out of our country. Recently, it is not surprising that we were shocked by diesel abuse. The KPDNKK, together with the Malaysian Anti-Corruption Commission (SPRM), in fact went down and carried out seizures and arrests of these irresponsible groups. We will continue to monitor this matter from time to time so that it does not happen. That is all, thank you.

Fuziah binti SallehPKR · PHKuantan · questionEN

6. Puan Fuziah Salleh [Kuantan] asks the Prime Minister to state whether the government is aware that, based on the 2009 Global Corruption Barometer Survey by Transparency International, the perception of Malaysians towards corruption in political parties is quite severe, whereas according to the 2009 Annual Report of the Malaysian Anti-Corruption Commission, only 15 members of political parties face prosecution.

Datuk Liew Vui KeongWARISANDeputy Minister in the Prime Minister's Department · SandakanEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Kuantan for this question.

Datuk Liew Vui KeongWARISANDeputy Minister in the Prime Minister's Department · SandakanEN

Mr Speaker, the findings of the Global Corruption Barometer Survey 2009 are based on the views of the public on the phenomenon of corruption in political parties in their respective countries. Meanwhile, the prosecution of 15 members of political parties by the Malaysian Anti-Corruption Commission (SPRM) in court is based on complaints received and evidence obtained during investigations. For the information of the Honourable Member for Kuantan, perception is not necessarily reality. Perception is largely shaped by current factors that are not clear and accurate. Meanwhile, the reality of SPRM's actions is based on the principles of law. That is all, thank you.

Puan Fuziah SallehPKR · PHKuantanEN

Thank you, Honourable Deputy Minister. The answer received seems to suggest that in reality there is no corruption and that it is only a perception. I would like to ask the Honourable Deputy Minister: this perception has in fact been formed based on several factors. In the same survey, when Malaysians were asked whether the government was effective or not in combating corruption, 67% of Malaysians said that the government was not effective in combating corruption, compared with the Indonesian Government. Indonesians said that of the Indonesian Government, 74% of them are confident that it is effective in tackling corruption. Also in Singapore, 96% of the people are confident that the government is effective in tackling corruption.

Puan Fuziah SallehPKR · PHKuantanEN

Perception is formed, with the permission of Mr Speaker, through experience, interaction and context that make people confident that corruption is high. So, it seems there is some denial or refusal here. I would like to ask the Honourable Deputy Minister. In Indonesia, there is asset disclosure by SBY and all candidates in elections. Perhaps with asset disclosure, and without fear, the Right Honourable Prime Minister and all leaders of Barisan Nasional would make asset disclosures. Is that what causes the perception of the Malaysian people to fall, and makes them feel that the government is not sincere in tackling this corruption? Please answer, Honourable Deputy Minister.

Datuk Liew Vui KeongWARISANSandakanEN

Thank you to the Honourable Member for Kuantan. Mr Speaker, I agree with the view of the Honourable Member for Kuantan that this perception is formed from experience. So, what is the public's perception of Pakatan Rakyat recently, where the PKR elections were shown to be full of so much cheating, one allegation. What is it? [Applause] [House in uproar]

Puan Fuziah SallehPKR · PHKuantanEN

Mr Speaker, I ask the Honourable Deputy Minister to answer the question, not to deviate and answer something else. [House in uproar]

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Is there no answer? [House in uproar]

Puan Fuziah SallehPKR · PHKuantanEN

Please answer the question.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the loudspeaker]

Tuan M. KulasegaranDAP · PHIpoh BaratEN

If there is no answer, just sit down. [House in uproar]

Datuk Liew Vui KeongWARISANSandakanEN

But that is the public's perception of Pakatan Rakyat, right or not? [House in uproar] However, I think the Honourable Member for Kuantan has only taken factors that can insult this Barisan Nasional government. If the Honourable Member

Datuk Liew Vui KeongWARISANSandakanEN

looks at the factors in the Global Corruption Barometer survey, which also took into account other sectors or organisations, where political parties are among five other organisations. The other sectors are Parliament, the business private sector, the media, civil servants, and the judiciary. The Honourable Member only chose Malaysia compared with Indonesia, where political parties in Indonesia are only 11% for corruption. But the Honourable Member did not show this august House that in Indonesia, Parliament...

Puan Fuziah SallehPKR · PHKuantanEN

Honourable Deputy Minister, my question concerns political parties...

Speaker (Datuk Ronald Kiandee)

Yang Berhormat.

Puan Fuziah SallehPKR · PHKuantanEN

Read the question, political parties!

Datuk Liew Vui KeongWARISANSandakanEN

Yes, okay. Parliament is 47%, but Mr Speaker, Malaysia is only 4% compared with Indonesia. So, there are other countries, Honourable Member for Kuantan, such as India, Thailand, South Korea, where their percentages are very much higher than Malaysia, namely 58%, 54%, and 38%. Malaysia is only 42%. For the Parliament sector, as I stated earlier, in Malaysia it is only 4% compared to Indonesia, which is 47%. So, this is one perception, is a game or perception, how people look at you and us. The Honourable Member for Kuantan did not inform this august House that this barometer survey was conducted from 15 to 18 February 2009. Before the Barisan Nasional government led by the Right Honourable Dato' Sri Mohd. Najib introduced the concept of NKRA, where the government has fought this corruption as a major pillar in our country. So, this one, it has not being taken into consideration. Honourable Member for Kuantan, please provide accurate information to this august House, yes. [House in uproar]

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

[Laughter] Thank you, Mr Speaker. If according to my opinion and understanding, the question of the Honourable Member from Kuantan... [Laughter] The Honourable Member hopes that SPRM takes drastic and resolute action to eradicate corruption among politicians. [Interjection] Because of this question, I would like to ask the Honourable Deputy Minister. What about the sand-theft corruption in Selangor? [House in uproar] Involving politicians, Selangor state Exco? If this can add to the number of 15, I hope SPRM takes resolute action. What is the opinion of the Honourable Minister? [Applause] [House in uproar]

Datuk Liew Vui KeongWARISANSandakanEN

Thank you to the Honourable Member for Sri Gading. Mr Speaker, I have already answered in this august House that SPRM has charged two of the six persons who were investigated in the sand-theft case. The allegation by a politician, the Honourable Member for Kuantan, cannot be used as a barometer. Therefore, we need to understand that when an accused person, especially a politician, is charged to answer a matter in court. They are usually able to obtain the services of well-known defence lawyers in Malaysia to defend them. So, if they are found not guilty, this does not mean that SPRM has not carried out its duties. This shows that their defence lawyers are usually, probably one of the best and they have to win the cases as defence counsel for their client.

Datuk Liew Vui KeongWARISANSandakanEN

So, defeat in cases involving politicians cannot be used as a barometer to censure SPRM. SPRM has in fact carried out its duties without choosing colour. They are colour blind and they will proceed with any charge against anyone who has violated the law in these corruption cases. That is all, thank you.

Ismail bin Mohamed SaidUMNO · BNKuala Krau · questionEN

7. Dato' Haji Ismail bin Mohamed Said [Kuala Krau] asks the Minister of Education to state what laws can be used against the misuse of the Malay language, such as the use of rojak language by radio announcers, advertisements on radio or television or on signboards.

Datuk Dr. Wee Ka SiongMCA · BNDeputy Minister of Education I · Ayer HitamEN

Thank you, Mr Speaker. Provisions on the use of the Malay language are contained in several laws and regulations currently in force in our country. In addition to Article 152 of the Federal Constitution, there is the National Language Act 1963 and 1967, namely Act 32, which is the principal law. Provisions on language use are also contained in various specific regulations in their respective fields and sectors. Among such laws are the Communications and Multimedia Act 1998, the Content Code 2003 (Kod Kandungan Penyiaran 2003), the Film Censorship Guidelines 2010, the Advertisements By-Laws, the Guidelines for Business Premises Signboards 2005, the Guidelines for the Planning of Outdoor Signboards 2009 and others. The government always takes steps to encourage the use of good and correct Malay through the existing laws. Apart from that, the government has also published guidebooks and language guides, provided language advisory services, provided special language registration, carried out monitoring, reprimands, and others. Thus, the government hopes to provide adequate education so that the people can use good and correct Malay in daily affairs. Indirectly, this step will be able to control the misuse of the Malay language, such as the use of rojak language by radio announcers, advertisements on radio or television or on signboards. That is all, thank you.

Thank you to Mr Speaker and the Honourable Deputy Minister. The Malay language has been guaranteed under the Malaysian Constitution, Article 152. The Honourable Deputy Minister has mentioned many acts and also laws that aim to guarantee the use of the Malay language in our daily lives. Nevertheless, we see that recently, society, including local authorities (PBT) and government agencies, government-linked companies (GLC), and in government meetings of any kind, have tended to use English.

For example, some time ago we mentioned in this House that the word 'Presint' in Putrajaya should be changed, and the government replied that we would change it, but now it still has not been changed. Recently, we had a little dispute with Indonesia, and we have been using many words from Indonesia. The term for car park has been changed to 'parkir'. This is something embarrassing for us. Has Japan become backward with its Japanese language? Has China become backward with its Chinese language? Why do we Malays not use the Malay language in our country, especially for us to achieve success in the fields of science and technology in our country?

Quebec in Canada uses English and French, and 130 million people have used this French in their daily lives.

Tuan Khalid Abd. SamadAMANAH · PHShah Alam

Soalan, soalan!

My question... the Honourable Member for Shah Alam is jealous, is he? My question is when exactly the government intends to really enforce the existing laws, or whether the government wants to establish a specific law to guarantee the use of the Malay language, as was reprimanded by the Right Honourable Deputy Prime Minister, and recently there was a forum organised by Berita Harian Sdn. Bhd, GAPENA and also PERSKOM and the Department of Information Malaysia (Jabatan Penerangan Malaysia). So my question is when the Malay language will really be guaranteed in daily life, especially in the fields of science and technology. Thank you.

Datuk Dr. Wee Ka SiongMCA · BNAyer HitamEN

Thank you, Honourable Member for Kuala Krau. For the information of the Honourable Member, the Institute of Language and Literature (Dewan Bahasa dan Pustaka) bears a heavy responsibility, namely that in terms of the correct and good use of language, it must be coordinated by Dewan Bahasa dan Pustaka, and I acknowledge that previously there were demands from various parties that we take legal action to sue those who do not use the language properly. For the information of this august House, amendments to the Dewan Bahasa dan Pustaka Act 1959 have indeed been proposed and are still not finalised at the Cabinet level. What needs to be done, apart from focusing on enforcement laws, what is better is that we guide the relevant institutions or stakeholders, especially in the financial industry, so that they are also involved in the same matter of using good language. So that is why we have stipulated that Dewan Bahasa dan Pustaka take the initiative to hold discussions with Bank Negara. We have a very good network so that every bank, not only do we monitor the use of the language, but at the same time we give prizes to those who use it well. That is one initiative. Secondly, I acknowledge that previously its implementation was chaotic. Indeed, in terms of public perception, people say we need to do something. That is why the government's commitment is there. The Right Honourable Deputy Prime Minister will chair a committee, namely a meeting to be held on 30 November, which is the establishment of the National Language Implementation Committee, and I think with this mechanism, whatever problems there are in terms of language use, whatever issues raised by the Honourable Member, we can formulate, find a formula, a method, and that is why we are working hard to correct what is not right. As an example, previously in this House we mentioned 'infotainment'. Now it is no longer used because Dewan Bahasa dan Pustaka felt we could use 'inforia'. That is our genuine language. Another example is TV3, which previously used 'Sure Heboh'. Now it has been changed on the advice of Dewan Bahasa dan Pustaka and it uses a word more to our taste, namely 'Jom Heboh'. These are the two best examples. Thank you, Mr Speaker.

Thank you, Mr Speaker. To the Honourable Deputy Minister, first of all I convey

congratulations. The Honourable Deputy Minister's use of the Malay language is very perfect. I am proud. However, our discussion this morning is about rojak language, market language and haphazard language. We acknowledge that this has reached a serious stage. Live TV broadcasts, for example reality programmes, entertainment programmes, and interactions between artists and fans, are spoiled because of language. I followed the live broadcast of the men's singles badminton final at the Asian Games - Lin Dan versus Chong Wei. The commentator, watched by millions of Malaysians, said: "Lin Dan serve tinggi ke belakang, lob ke belakang oleh Chong Wei, drop oleh Lin Dan, net oleh Chong Wei, net oleh Lin Dan, ke belakang oleh Chong Wei, keluar ke base line". How much rojak language is that. That is serious and it is watched by millions of people. It means the commentator, the most basic one sent - is that commentary in Malay or English, rojak language or haphazard language? That is the reality if we observe. So, I think the Honourable Deputy Minister's answer was indeed satisfying. I do not disagree on that point. The issue is still an issue of enforcement of the National Language Act 1967. I have studied it, perhaps there is no provision, unless I am wrong, the Honourable Deputy Minister may correct me. Is there a provision under the heading of enforcement against misuse of language under the National Language Act 1967? If indeed there is none, does the ministry intend to amend it, because even where a clear provision exists, violations still occur. This morning in the Federal Court, which is the highest court, the judge made a decision that a judge may use, may write judgments in either Malay or English, even though Section 8 of the National Language Act states that all court proceedings, whether arguments by lawyers or defence counsel or written judgments by judges of the Federal Court, Court of Appeal, High Court or courts below must be in the National Language, and this is the language whose dignity is guaranteed under Article 153 of the Federal Constitution. However, this morning's judgment clearly flouts this section, Honourable Deputy Minister. This means that not only have we not resolved the problem of rojak language, but we have also failed to enforce what is already clear in the national language act. Please, I request the Honourable Deputy Minister's comment.

Datuk Dr. Wee Ka SiongMCA · BNAyer HitamEN

Thank you, Honourable Member. Actually, as a Member of Parliament I do not interfere in the affairs of another pillar, namely on legislation, because I respect that pillar. I think that is the first point. Second, regarding what the Honourable Member asked me about sports commentators, actually I agree with the Honourable Member, but we need to see that sometimes the language used is the language or jargon of the sport itself. If they say 'short' (pendek), if we are already accustomed to that term, it is not a problem. So, I think the time has come for us to consider that if we want to uphold the national language even in sports, we must use language that is a term understood by everyone and is a term used universally. I agree with that, because that is our hope for the establishment of the National Language Implementation Committee chaired by the Right Honourable Prime Minister. We will see what scope can be used as terms of reference, what can be improved in terms of implementing our national language, and we will do it.

Datuk Dr. Wee Ka SiongMCA · BNAyer HitamEN

The second point, Honourable Member: what the Honourable Member just said about the use of this language. Before that, we must think about the best way to take action against those who do not use it properly. That is why I have repeatedly said here, since yesterday, that there is indeed pressure to take action. But in drafting or making any decision, we must look at its implications. How would we do it if an event involves foreign investors? What must we do? Everything must be refined before any action is taken, so that we do not get trapped in that situation. We agree that we need to encourage the proper use of the Malay language, but at the same time we should not bind ourselves so that we cannot do anything. In terms of promotion, as one example, Bank Negara requires all forms to be in two languages. That is a start. That is a good start. In the past, we thought financial institutions definitely could not use English, and that at least bilingual use was a way for us to uphold our national language. That is one example. We take note of what the Honourable Member has conveyed, and we will look for methods when this committee is formed. Thank you.

Ooi Chuan AunDAP · PRJelutong · questionEN

8. Mr Jeff Ooi Chuan Aun [Jelutong] asks the Minister of Transport to state complete details of the number of take-off and touch-down movements and the passenger traffic recorded at the KLIA, LCCT Sepang, Penang, Kuching and Kota Kinabalu airports from 2007 to the present. What are the upgrading plans for all these airports under the Tenth Malaysia Plan?

Datuk Abdul Rahim bin BakriUMNO · BNDeputy Minister of Transport I · KudatEN

Mr Speaker, for the information of the Honourable Members, the following is the data on the number of aircraft take-off and landing movements and total traffic from 2007 to June 2010, that is, for three and a half years: | Airport | Aircraft Take-off & Landing Movements | Passenger Traffic | |-----------------------|----------------------------------------:|---------------:| |KLIA | 740657| 99798305| |KLIA I / Main Terminal| 446211| 61689523| |LCCT / KLIA II | 294446| 38108782| |LTA Penang | 132498| 11855151| |LTA Kuching | 131650| 11846631| |LTA Kota Kinabalu | 182394| 16544971|<END_TABLE_MARKER> For the information of the Honourable Members, the Ministry of Transport has indeed planned to continue the upgrading project of Kuching International Airport and Kota Kinabalu International Airport under the Tenth Malaysia Plan, while under the Second Economic Stimulus Package it covers the upgrading works of Penang International Airport and the construction of all LCCTs at KLIA II. Thank you.

Tuan Jeff Ooi Chuan AunDAP · PRJelutongEN

Mr Speaker, allow me to welcome the arrival and also the visit of a group of residents from Kampung Balik Pulau, Penang. [Applause] Thank you, Mr Speaker, thank you, Deputy Minister. Congratulations, Malaysia, for managing to record so many landings and take-offs, as well as the increasing number of passengers. I also take from the Minister of Transport's announcement the other day, last week, which said that many international airports in Malaysia have shown an increase in double-digit figures. Congratulations, Malaysia. I think the Deputy Minister will agree with me that this phenomenon of increasing passengers landing at and departing from airports in Malaysia is due to two factors, among others. The first factor is Malaysia's commitment to the Open Sky Policy, or Polisi Langit Terbuka. The second is the very active encouragement and contribution as a catalyst from the industry arising from low-cost airlines such as AirAsia, Firefly and so on. If Malaysia is bound by the open sky policy, why has AirAsia X not been allowed to fly to Sydney from Kuala Lumpur until today? If AirAsia X could fly from Kuala Lumpur to Sydney and back, surely passengers and tourists would increase even more and bring many blessings to our country. Regarding the upgrading of the airports mentioned by the Minister just now, I want to ask when an LCCT will be built in Penang, when KLIA already has LCCT I and Sabah too already has its LCCT, and if we look at Penang International Airport, it is an LTA that is extremely rapid in terms of movements and take-offs and landings. When will the Penang LCCT be built, and is it true that the rumours say the operation...

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Member, I know there are Penang people above you, but the question is far too long. [House in uproar]

Tuan Jeff Ooi Chuan AunDAP · PRJelutongEN

The operation of Penang International Airport will be handed over to the Syed Mokhtar Al-Bukhari Group, because Penang Port will also be given to Syed Mokhtar. So, is that a model to be made a twin, so that the seaport and the airport will be given to such a group which has shown its success at Skudai International Airport and also at Tanjung Pelepas Port? Thank you.

Thank you, Mr Speaker, thank you, Honourable Member. The Honourable Member's question is very long, but I want to state here that the Malaysian Government is indeed committed to the Open Sky Policy. Regarding the Honourable Member's question on the building of an LCCT in Penang, so far what we are doing is upgrading Penang International Airport with an allocation of RM250 million, and the works have proceeded smoothly. So far, these works have achieved progress of 34.24%, and this expansion will allow use not only by premier airlines but also by low-cost airlines. Regarding what the Honourable Member asked about the takeover by the Syarikat Syed Mokhtar Group, I have no information on this and I do not know whether there is any such proposal.

Regarding the flights to Sydney, I would like to state here that many of the routes AirAsia wants to explore are routes that have been developed for so long by Malaysia Airlines. Therefore, although we take competition into account, at the same time we must also take into account that AirAsia itself has many routes that we have handed over to them which they have not yet used. So, we made that decision based on economic considerations for both airlines.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Thank you, Mr Speaker. The Honourable Member for Jelutong only asked about Penang, but what has happened at Penang Airport is the result of the efforts of the Barisan Nasional Government. [House in uproar] Likewise, the excellent RapidPenang in Penang is the contribution of the Barisan Nasional Government. [House in uproar]

Tuan Mohd. Yusmadi Mohd. YusofPKR · PRBalik PulauEN

Mr Speaker, that is the Bayan Lepas person. Don't deceive the people of Bayan Lepas.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Okay. I want to ask, Mr Speaker, he mentioned the LCCT Sepang, KLIA ...

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

What did the Pakatan Government contribute? [House in uproar]

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

I asked about airports.

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Member, Honourable Member.

Tuan Khalid Abd. SamadAMANAH · PHShah AlamEN

That is why the people rejected BN in Penang, yes.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

I asked about – after this I don't know yet. I want to ask about Batu Berendam Airport, which may be in the Deputy Minister's information because I am confident it can contribute to the development and economy of the regions of North Johor, Melaka and Negeri Sembilan, which are far from the Southern Region and the West Coast. So, what are the Ministry of Transport's plans to maximise the use of Batu Berendam Airport, so that it provides facilities for the residents in the area to commute, and makes it one of the hubs of the southern region besides Melaka, so that it is easier for me, a person from Ledang at the back, to commute to Penang and so on. Thank you.

Mr Speaker, thank you, Honourable Member. We indeed intend to see Batu Berendam Airport, Melaka, reach an increasingly higher level of development from time to time, and that is why we have many incentives given not only to Melaka but to all secondary airports, so that many flights from abroad can operate directly or fly directly to airports of this kind.

Therefore, recently, in a meeting held in the Economic Council chaired by the Prime Minister, the government agreed to reduce the PSC, or passenger service charge, for all secondary airports including Batu Berendam Airport, Melaka, by lowering the PSC rate to a low level of RM26. This is one of the incentives used to encourage the use of secondary airports and also to increase frequency to destinations, and is an incentive given to

companies, not only local companies but also foreign companies. Besides that, there are many more incentives and promotions implemented to make the airports in this country succeed. Thank you.

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Members, the oral question-and-answer session has ended. [The time for Questions for Oral Answer has ended]

Motion — Time of Meeting and Business Exempted from Standing Orders Deputy Minister in the Prime Minister's Department [Datuk Liew VuiMotion

Keong]: Thank you, Mr Speaker, I respectfully move: "That, pursuant to Standing Order 12(1), the sitting of the House today shall not be adjourned until 7.30 pm and thereafter the sitting of the House shall be adjourned until 10.00 am on Thursday, 25 November 2010."

Dato' Yong Khoon SengSUPP · BNDeputy Minister of Works · StampinEN

Mr Speaker, I respectfully second.

Deputy Speaker (Datuk Ronald Kiandee)EN

Honourable Members, I now put the question to the House for decision. The question is that the motion as moved just now be agreed to. [Motion put for decision; and agreed to]

Bill — Supply Bill 2011 and Development Estimates Motion 2011 CommitteeBill

The Order of the Day was read to resume consideration of the "Supply Bill 2011 and Development Estimates 2011 in the Committee of Supply of the House" [Sixth Day] The House sat in Committee. [Deputy Speaker (Datuk Ronald Kiandee) chaired the Committee]

Bill — Supply Bill 2011 and Development Estimates Motion 2011 Committee — Head B. 22 [Schedule] – Head P. 22 [Development Estimates 2011] –Bill

Mr Chairman (Datuk Ronald Kiandee)EN

I invite the Honourable Minister of Rural and Regional Development to reply.

Dato' Haji Hasan bin MalekUMNO · BNDeputy Minister of Rural and Regional Development I · Kuala PilahEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, greetings of peace and greetings of 1Malaysia. Honourable Chairman, first of all, on behalf of the Ministry of Rural and Regional Development (KKLW), I wish to extend my heartfelt thanks to the Honourable Members who took part in the debate on the 2011 Supply at the Committee stage, which touched on matters relating to the Ministry of Rural and Regional Development. A total of 28 Honourable Members took part in this debate. [Deputy Speaker (Datuk Dr. Wan Junaidi bin Tuanku Jaafar) chaired the Committee] The Ministry of Rural and Regional Development (KKLW) was allocated a total of RM7.9 billion in 2011. This allocation is 40.8% higher compared to the 2010 allocation, which totalled RM4.9 billion. This increase in allocation shows the high commitment of the Barisan Nasional Government in efforts to develop rural areas. Of the 2010 allocation of RM4.9 billion, up to 12 November 2010, KKLW had spent RM3.38 billion, or 67.1%. The Ministry is confident of increasing expenditure performance to 97.1%, considering that most projects, especially NKRA projects, have been completed and are now in the payment process. The 97.1% performance for 2010 will enable KKLW to achieve Ninth Malaysia Plan expenditure performance of 95% of its total allocation, that is RM18.3 billion. This high performance reflects the government's sincerity in ensuring that the people come first and achievements are prioritised. The major part of KKLW's 2011 allocation is to implement NKRA basic rural infrastructure projects, that is RM6.463 billion or 81.8% of the 2011 allocation. Of the RM7 billion just now, RM6 billion is for NKRA projects. To ensure that the 2011 NKRA projects are completed on schedule and fully spent, the Ministry has completed the appointment of consultants, procurement matters and land acquisition in 2010. Before entering 2011, we had already started these works in terms of planning, land acquisition and so on. Therefore, on behalf of the Ministry, I personally am very moved by the grievances and the very high hopes, especially from the Honourable Member for Sri Gading and the Honourable Member for Kinabatangan, whose concern, as I see it, is also the concern of the Ministry. Insya-Allah, based on the performance of 2010, I am quite confident that, insya-Allah, the Ministry will try to reduce this poverty rate. I admit there are some matters that need emphasis, and with the cooperation and support of the Honourable Members, insya-Allah we will try to work on all of these, by the grace of Allah SWT, insya-Allah we will strive for them.

Tuan Mohd. Yusmadi Mohd. YusoffPKR · PRBalik PulauEN

Honourable Deputy Minister, just a little on the land acquisition mentioned earlier. Honourable Deputy Minister, I request an explanation, considering that you have received an increased allocation this year and just stated a high commitment. My specific explanation regarding land acquisition

Tuan Mohd. Yusmadi Mohd. YusoffPKR · PRBalik PulauEN

just now, because in Balik Pulau there is an extremely critical issue in the name of rural development, in the name of rural development, because Balik Pulau is rural. I request an explanation from the Honourable Deputy Minister: whether there are funds approved that we are debating now for critical needs, because in the name of development, people are being evicted, people who have received notices from the court. It is true that it is due to purchases by the private sector, but the direct consequence is on the welfare of the local community. I feel that if the Deputy Minister, with the commitment just now, I think the Deputy Minister will see this issue as an urgent issue that needs to be addressed immediately, especially for me in the Balik Pulau Parliamentary constituency. I request an explanation.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you, Honourable Member, friend from Balik Pulau. We are very sincere, clearly, meaning that the allocation just now will all try to solve the critical problems the Honourable Member mentioned. This is where we need information from the Honourable Member and also support from the state government, this is important because land matters are actually matters for the state government. If they delay, and there are many examples at this time, this will not allow the Ministry to implement projects like what was mentioned in Balik Pulau just now. If there is support and cooperation, insya-Allah we will implement them, because our side sees that we put the people first. So, we can discuss outside later on what kind of help is needed.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Mr Chairman, the Honourable Member for Jerai, the Honourable Member for Padang Terap and the Honourable Member for Kuala Krai touched on the issue of the allocation totalling RM300 million under the SPKR item. The Ministry records its thanks, okay, the introduction just now, yes. The Honourable Member for Kalabakan is invited.

I am the Member of Parliament for Kalabakan, coming from Sabah. We do not deny that billions have been given by the government, but how is this, Mr Chairman? This newspaper says "40% of Malaysia poor in Sabah", 40% poverty, the poorest in the country.

Mr Chairman, in Batu Sapi – masya-Allah, we see it very clearly. We say the PKR candidate fell, we say it's a show. However, in Sarawak, the personal assistant of the Home Minister fell – the bridge collapsed. Where has all this billions gone, Mr Chairman? [Applause] Can we deny this, Mr Chairman? [Showing a newspaper clipping] If Mr Chairman permits, I will read it.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Member for Kalabakan, it is not the Minister's assistant but the Home Minister. The Deputy Speaker also fell too.

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

Deputy Speaker... [Laughter]

Dengan izin Tuan Pengerusi, saya baca, “It was shocking to learn from the just released World Bank’s 2010 Malaysian Economic Monitor that Sabah has about 10% of the Malaysian population...” – penduduk Sabah

adalah 10% daripada penduduk negara. “But more than 40% of all poor people in Malaysia live in Sabah.” Kita mahu tolak ini – ke mana kita hendak tolak?

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

It can no longer be denied.

Reject BN to the sea.

This is problematic. So we – billions, we thank the Prime Minister. However, we ask that the implementation be monitored, because in Sabah and Sarawak, there are people in rural areas who still defecate in the forest – there are still no toilets in every house, no communal toilets in every residential area. So where...

Air minum.

There is no water, there is no electricity. Mr Chairman, if we talk about development, surely if we think about the billions I raised in my speech, I said Sabah received RM12.5 billion for 2011, where has the money gone? So, we ask that the Ministry and the Minister of Rural Development be serious about eradicating poverty in Sabah and Sarawak. Perhaps in Peninsular Malaysia there is already a shortage of poor people, so focus on Sabah and Sarawak.

Tuan Haji Mohd. Abdul Wahid bin EndutPAS · PRKuala TerengganuEN

There are even more in Terengganu.

So we ask that an explanation be given – a real explanation and not a charade. Thank you.

Tuan Haji Mohd. Abdul Wahid bin EndutPAS · PRKuala TerengganuEN

In Sabah and Sarawak bridges collapse; in Terengganu even stadiums can collapse, mosques can collapse too.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you, that has nothing to do with this issue. I agree with the Honourable Member for Kalabakan earlier about poverty in Sabah and Sarawak. That is precisely why I want to mention – if you refer back to the allocations of the Ministry of Rural Development that I mentioned just now, RM7.9 billion, most of it falls under the NKRA. This NKRA focuses on Sabah and Sarawak. If I were to read it out from here, it is clear that our leaders today are listening, watching and seeking solutions. God willing, out of these billions that we have mentioned, some will go to the people of Kalabakan, to the people of Kinabatangan and to others too. Therefore, I see that our projects or performance in 2010, which is 97.1% as mentioned earlier, already prove that some of it has been started. We do not have Aladdin's lamp – rub it here and tomorrow everything will be done. No, it is not possible. But we proceed in stages and so on. Therefore...

Tuan Khalid Abd.SamadAMANAH · PHShah Alam

Timbalan Menteri...

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

This is still long.

Tuan Khalid Abd.SamadAMANAH · PHShah AlamEN

This is not Aladdin's lamp. It is not that we want it tomorrow; we are asking for it today.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

I think the Honourable Member for Shah Alam, there is no need...

Tuan Khalid Abd. SamadAMANAH · PHShah AlamEN

It has been 54 years, Deputy Minister, this is not something new. We are not asking for something magical – it has been 45 years. Every year it is the same – promises of millions, hundreds of millions, billions, but in the end the problem remains the same, as stated by the Honourable Member for Kalabakan. We are not asking for magic. We are asking for a responsible and transparent method of implementation. We cannot blame government officers and say the government has done it, the money has gone, but this is the implementation. The government is responsible for ensuring that the implementation achieves its objectives. It cannot wash its hands of it. The buck stops there – with the Cabinet, not with the government officers. Let us not wash our hands of it so easily.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

I did not mention anything about government officers at all. What is important is that it must...

Tuan Khalid Abd.SamadAMANAH · PHShah AlamEN

Never mind, I want to say it. Why? Because often, that is the excuse. He says delivery...

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

I am saying all this with the permission of Allah SWT. The matter of ministries, the matter of the government...

Tuan Khalid Abd. SamadAMANAH · PHShah AlamEN

Let us not blame Allah SWT for our failures.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Let me answer first.

Tuan Khalid Abd. SamadAMANAH · PHShah AlamEN

Let us not look for excuses. The fact is, we must acknowledge our weaknesses.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Has the Honourable Member for Shah Alam ever not...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Member, although at the committee stage we relax the rules, there must still be as much discipline as possible. Thank you, Honourable Member.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

So, I must respond again. Did you not realise – I am the same too. My village too used to bathe with well water, drink river water and so on, and light with kerosene lamps. But look at today. The same goes for Shah Alam, Johor and so on. The improvement has been gradual. In the end, this is the situation. The same goes for what I mentioned in Sabah and Sarawak. That means we acknowledge there are shortcomings. Nevertheless, we intend – we want to start from the 2010 performance that shows this. God willing, in 2011 we will improve and add more. Therefore, our emphasis and focus is on Sabah and Sarawak.

Tuan Azan IsmailPKR · PRIndera Mahkota

Penjelasan.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

If I were to read out all these allocations, it is clear to all of us that we are indeed focusing on this because this is part of the allocations that we will use.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

May I ask a little? Thank you.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

We are only just starting, Honourable Member.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Give me some encouragement, give me some encouragement. Thank you, Mr Chairman. My question is brief. I want to move away from what was raised by the Honourable Member for Shah Alam and friends earlier, but it is still a rather important matter for us. The government promised, the government said that within four years from now,

Tuan Azan IsmailPKR · PRIndera MahkotaEN

the people of Malaysia will have high incomes under the plan that the Honourable Member mentioned earlier. Only four years left. But the Honourable Member for Kalabakan said that most of the poor people of Malaysia are in Sabah and Sarawak – Sabah in particular, and this is acknowledged. Two or three days ago, the government acknowledged that the highest poverty rate in Malaysia is in Sabah, and that per capita income in Sabah, where most people are, is below RM10,000 a year. I want to ask the Honourable Deputy Minister, does the Honourable Deputy Minister believe or not that, with this plan within these four years, we can lift the majority of the people of Sabah who are severely left behind from this RM10,000 per capita to RM38,000? I want to hear how the NKRA will be carried out within these four years? Thank you.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

That was just the introduction. I think I will mention it in my subsequent answers, Honourable Member. We already have plans to raise the high incomes of the people and so on through the New Economic Model, which has been implemented today and planned, and God willing, it will begin. Likewise, regarding FELDA and RISDA, we are merging them because we want to carry out mega projects. This too, in my view, is towards that. That means we must be patient – for that purpose. For us, we are confident. God willing, if there is support from all parties, this can be implemented, including in Indera Mahkota.

Tuan N. GobalakrishnanPKR · PRPadang Serai

[Bangun]

Honourable Deputy Minister, just a little, Honourable Deputy Minister.

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

Just a little, Deputy Minister.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

This will not end at this rate.

Just a little, just a little.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Here, I give it to my friend, the Honourable Member for Padang Serai.

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

Thank you, Mr Chairman, thank you, Honourable Deputy Minister. Padang Serai is in Kedah, not Sabah. Honourable Deputy Minister, we all understand that every time there is a budget, billions are spent. After 45 years of Sabah receiving billions, billions, billions, billions, I am sure that less than 50% of what is injected into the development of the state of Sabah has succeeded. So, can the Honourable Deputy Minister give some explanation regarding – of the RM7.9 billion injected this time, what percentage will be channelled to Sabah and what is the Deputy Minister's estimate – can you give an explanation of what percentage could succeed? This is because I believe that, previously over 45 years, certainly less than 50% succeeded.

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

If 100% of what is injected succeeds, it means there will be no houses without electricity, no people drinking dirty water, no bridges collapsing. So, this time, what percentage does the Minister hope will reach the people and development will be implemented?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay, Honourable Member for Padang Serai. Actually, for a specific question on what percentage for that purpose, I need a little time because I have to calculate and so on. [Laughter]

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

But from the allocations we have, it is clear that most of it is for infrastructure development in Sabah and Sarawak. If I were to read it out it would be too long, Honourable Member, but in my view, I am quite confident that, God willing, if there is support from all parties, these plans can be implemented perfectly.

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

The Minister should estimate roughly what percentage. I believe not 100%.

Dato’ Haji Hasan bin MalekUMNO · BNKuala Pilah

Saya ingat...

Tuan N. GobalakrishnanPKR · PRPadang SeraiEN

Perhaps 70% or less than 50%. That is all, the Minister's own estimate after decades of experience in politics and also as a Member of Parliament. Roughly what percentage is the estimate?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay. Based on 2010, we achieved 97.1%. So, in the future, I am very confident that more than 90% can be implemented, God willing. If you understand. [Laughter] Okay.

Tuan Khalid Abd. SamadAMANAH · PHShah Alam

[Bangun]

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Mr Chairman, the Honourable Member for Jerai, Padang Terap and the Honourable Member for Kuala Krai touched on the issue of the allocation totalling RM300 million...

Tuan Khalid Abd. SamadAMANAH · PHShah AlamEN

Deputy Minister, Deputy Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Under the SPKR item. The Ministry records its thanks...

Tuan Khalid Abd. SamadAMANAH · PHShah Alam

Timbalan Menteri.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Wait, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

On the suggestion and proposal of the Honourable Member. However, the RM300 million allocation under the 2011 Budget, SPKR has been earmarked...

Tuan Khalid Abd. SamadAMANAH · PHShah Alam

Timbalan Menteri.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

To finance the implementation of the Housing Assistance Programme (PBR) for the poor and the hardcore poor in rural areas across the country. The Ministry also plans to distribute a total of RM1.9 million to finance the implementation.

Tuan Khalid Abd. SamadAMANAH · PHShah Alam

Timbalan Menteri.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

A total of 80 new house construction and renovation projects for the Padang Terap Parliamentary constituency, and RM1.2 million will be distributed to implement PBR projects in the Kuala Krai Parliamentary constituency. It is clear to us that regardless of the area – opposition or government, Barisan Nasional or not, we help because for us the people come first. So, the accusations by the Honourable Member are not valid. I deny them completely. All I ask is for support from all parties.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Member, the Honourable Member for Shah Alam, Honourable Member?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Yes? I think there is no need. I would just be wasting my time. [Laughter]

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)

Yang Berhormat.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Because this was raised previously by...

Tuan Khalid bin Abd. SamadAMANAH · PHShah Alam

Tuan Pengerusi.

Tuan Speaker.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

I am only giving it to those who have voiced...

Tuan Pengerusi.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

I am only giving an answer to those who raised it in the Committee. The Honourable Member for Shah Alam was not even at this Committee stage. Today he is deliberately trying to disrupt me.

Tuan Khalid Abd. SamadAMANAH · PHShah Alam

Sedikit sahaja.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Sorry. Let's talk outside then. The Honourable Member for Kota Belud asked...

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Honourable Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The number of PBR houses to be built in the Kota Belud Parliamentary constituency in 2011. The Ministry plans to allocate a total of 217 PBR projects in the Kota Belud area with an estimated cost of RM6.2 million for 2011. As for the issue of the high cost of electricity supply connection, the Ministry is doing its best to overcome this problem through providing an extreme cost of RM4,000 for each housing unit. That is for Kota Belud. The Honourable Member for Sibu raised the issue of PBR house construction in the Sibu Parliamentary constituency, which received houses of poor quality and not comparable to the price of RM40,000 per house because it was carried out by subcontractors. The construction of PBR houses is based on the standard plan provided by the Ministry, its implementation is regulated by the Sarawak Rural Development Ministry and monitored by the Sibu Residency and District Office. Therefore, the Ministry will investigate this matter and will take further follow-up action for Sibu.

A little, Minister. On housing, Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member from Tenom raised – Let me resolve this housing issue.

Yes, thank you.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Tenom raised the issue of PBR houses in the Tenom area. It was informed that in 2010, Giat MARA implemented three house renovation projects in Tenom and the implementation of these projects has been informed to the District Office. House renovation projects are based on the need to repair the condition of damaged or dilapidated houses and are not subject to the standard specifications of new house construction projects. Regarding the issue of the Local Community Development Programme (PPMS) Perlop, as raised by the Honourable Member for Sungai Siput, the Ministry will gradually equip PPMS Perlop with economic projects to provide additional benefits to PPMS participants. A total of 16 projects

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

economic projects costing RM110 thousand have been implemented at PPMS Perlop to generate additional income together with this PPMS. Regarding the issue of employment opportunities for residents of Kampung Asap affected by the Bakun Dam development project, this matter falls under the jurisdiction of the Sarawak State Government. The Ministry will obtain further information from the state government on this matter. Honourable Member for Balik Pulau, please.

Yes. Minister, earlier the Minister said that the Minister will implement this based on information from the ministry. But in this same House, and according to my information on the ground, at the district office and related ministries, there are no statistics or data on home ownership. It was said earlier that PPRT would be built, and for me, if there is no such data and you prove me wrong, we do not even have a shred of evidence on home ownership so far among Malaysian citizens, let alone in rural areas. Therefore, most programmes, there is a paper by Professor Goh Ban Lee, from USM, a housing expert – sometimes he says supply exceeds demand. So, when looking at that study, the information is not available at the ministry level. So, I seek an explanation from the Minister, where did the information mentioned earlier come from, because when I checked at the district office there was none. So, I feel that if we spend without accurate data, how can we make accurate assessments of improvement or decline? I feel our expenditure will be wasted and this matter is critical, especially the housing issue. Minister, I seek an explanation.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Balik Pulau just now said critical, yes. That is difficult. [Laughter] So, for the information of the Honourable Member for Balik Pulau, the Ministry actually implements these projects based on requests from the grassroots made through the mukim, through the penghulu to the district office, discussed by a focus group and so on and then escalated to the ICU and so on. This data does exist, and based on this we are able to implement the housing projects mentioned earlier. If there are shortcomings here and there, please tell us. Not only in this House, it would be good to inform me personally so that we can investigate where the need can be met and so on. We are ready to help. Whether from Balik Pulau or from the opposition or not from the opposition, we will help, God willing. Community Empowerment and InfoDesa. The Honourable Member for Putatan raised the issue of the increase in allowances for the JKK Chairman and village heads and whether the RM156 million allocation approved is sufficient to pay the allowances. The Cabinet on 1 March 2006 – this specifically for Sabah – approved the harmonisation of village head allowances at the rate of RM450 a month. Accordingly, for the time being, the allocation disbursed to the Sabah State Government is for payment to village heads whose list has been approved by the Sabah Native Affairs Office. This means that payment of additional allowances is also for village heads. However, if there is a need, the Sabah State Government may submit it to the Ministry for further consideration. The allocation of RM156 million approved was based on the calculation of the old rate. Therefore, taking into account the new announcement where the increase is doubled, it is insufficient, and it is estimated that about RM167.5 million more is required.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Parit Sulong requested an explanation on the Village ICT Training Module. The Village ICT Training Module is divided into two: the first module, Village Computer Literacy, which focuses on basic computer use such as operating computers in Windows, Microsoft Word and Excel, internet use and the use of open systems, Open Office. The second module is Computer Skills Training, which focuses on ICT skills courses such as computer maintenance and repair, video and photo editing, development of blogs and websites and computer network operation or networking.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

This means village ICT training is not only for games. Regarding the question from the Honourable Member for Lipis on why there is no allocation for the community empowerment and InfoDesa division in 2011. For the information of the Honourable Member, the Ministry is working to apply for new allocations from the central agency. The Honourable Member for Hulu Terengganu also asked about the development planning of the Vision Power Movement (GDW). The Vision Power Movement is a continuous movement implemented by various departments or agencies under the Ministry. Allocations are not directly provided under any specific item or activity. GDW is an effort to empower village residents with three main powers towards developing well-being families, namely human capital power, economic power and market power. Among the programmes implemented indirectly to achieve the GDW concept are the provision of road network facilities to facilitate economic activities, learning facilities for both pre-school and adult groups which will enhance human capital capacity, and business facilities managed by agencies under the Ministry. Economic empowerment. Honourable Member for Kota Raja. Not present here. Raised the issue of government efforts in encouraging rural residents to grow vegetables such as the Bumi Hijau Programme. The Ministry is indeed very supportive of efforts to increase rural residents' income through various economic activities including agricultural projects such as vegetable cultivation under the Bumi Hijau Programme. However, in fact the Bumi Hijau Programme is under the responsibility of the Ministry of Agriculture and Agro-based Industry. We assist and cooperate. Land and Regional Development. The Honourable Members for Padang Terap, Beruas, Sungai Siput and Hulu Terengganu raised the issue regarding programmes implemented by the agencies RISDA and FELCRA. To assist landowners who do not have titles, as raised by the Honourable Member for Padang Terap, RISDA provides land premium assistance for boundary survey work, planting boundary stones and premium payments. This incentive is only given to prospective landowners who agree to join group replanting projects, subject to a maximum approval of 4.04 hectares, that is 10 acres for each participant. Based on applications received in 2010, a total of RM46,175 has been paid to eligible participants covering an area of 40 hectares with 18 participants. Honourable Member for Beruas

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Questioned the issue that the allocation for replanting is insufficient, whereas the government collects cess from smallholders. The replanting cess rate collected is 9.92 sen per kilogram for rubber exported and for domestic use. The total collection is in the region of RM60 million a year. However, the expenditure to cover the Replanting Programme is RM200 million a year. Of this amount, the government has contributed 70% through government grants and the remaining 30% is covered by cess money. Replanting assistance payments are made in instalments to ensure that the replanted estates succeed. Given that the cost of replanting development is increasing, the government has approved an increase in the replanting assistance rate, effective 1 September 2010. The replanting assistance rate for rubber-to-rubber has been raised to RM9,230 per hectare for Peninsular Malaysia, RM14,000 per hectare for Sabah and RM13,500 per hectare for Sarawak. This new rate has been able to overcome the problem of rising replanting costs. Whatever leads to the economic improvement of our rural people, we will try to help. This is an increase from the matter of this replanting assistance.

[Bangun]

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Just a moment. The average number of replanting applications received is 45,000 hectares a year, whereas the existing allocation can only finance 20,000 hectares a year for rubber and 10,000 hectares for oil palm. The Honourable Member for Kapit.

Thank you, Honourable Deputy Minister. This Replanting Programme concerns oil palm in Sarawak. In my view in Sarawak, we do not yet need assistance for replanting for smallholders. This is because smallholders in Sarawak only entered this field a few years ago. So, the oil palm trees they have have not yet reached the age at which they need to be replaced and replanted. Therefore, is the ministry considering other ways to help oil palm smallholders in Sarawak? Because for replanting, we must not be left behind in government or ministry assistance in this field. Can assistance be given by the government through this ministry to oil palm smallholders in Sarawak?

Tuan Haji Mohd Nor OthmanUMNO · BNHulu TerengganuEN

Honourable Deputy Minister, the same matter. Thank you, Honourable Deputy Minister. In my Parliamentary constituency, landowners who were unable to cultivate their land have handed it over to the Rubber Industry Smallholders Development Authority (RISDA) and some to the Federal Land Consolidation and Rehabilitation Authority (FELCRA) for development. When RISDA or FELCRA develop it, we find that over a very long period, smallholders hope that the land will yield produce and they will receive returns and get their land back. However, what is happening now is that the debts borne from their land developed by RISDA or FELCRA are too high, so they are unable to redeem them, and this causes smallholders to feel that their land seems to be about to be owned by FELCRA or RISDA. Thank you.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

In answer to the question of the Honourable Member for Kapit just now, we indeed know and understand that in Sarawak RISDA has only just entered, and the question of replanting does not arise. However, although the purpose of that allocation does not exist, our side does provide other assistance. For example, in terms of payment for land for boundary survey work, for planting boundary stones, premium payments and so on. This means there is no replanting, but there is other assistance that we can channel. What is important is that if the people there plan to carry out projects such as oil palm, rubber and so on, we have assistance for that purpose. I see that Kapit is among the Parliaments that have led the Oil Palm and Rubber Planting Programme through the projects we have mentioned earlier. The Honourable Member for Hulu Terengganu is similarly situated. That means, what was mentioned earlier about payment...

Tuan Haji Mohd. Nor OthmanUMNO · BNHulu TerengganuEN

The costs financed by RISDA and FELCRA are too high, causing the debt for developing the land to be more expensive than the actual value of the land, so that farmers feel that they have lost their land.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Hulu Terengganu, the RISDA programmes implemented usually involve the participants themselves. This is because in the projects undertaken by RISDA, we bring the participants together to sit, discuss and implement what should be done or carried out to make the estate a success. Therefore, if there are problems in terms of price increases and so on, they can be reported to me and we will try to help in whatever way and so on. So, however, what is important is that the information must be conveyed to that committee. There is a committee that has been set up. RISDA assists and so on. Regarding the status of the investigation into RISDA's investment of RM400 million in the construction of a golf course, RISDA has in fact never been involved in any golf course development investment.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Hulu Terengganu raised the issue of estates developed by RISDA and FELCRA...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

May I ask for an explanation?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Over 30 years it was found. Ha! The Honourable Member for Beruas.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

With regard to that RM400 million, has it not been reported about six or seven years ago, where people did not receive RISDA replanting assistance, and the main reason given was that the money disappeared because it had been invested in suspicious circumstances. The Beruas MP at that time, Tun Lim Keng Yeik, who was the Minister responsible at that time, explained why the replanting money could not be given to the people. So, I want to get an explanation on this matter because it has been reported in the media, and also the question I raised: RISDA is at fault, so why are smallholders being blamed when RISDA has no money for replanting? They cultivated with their own money first, then because they had already planted before RISDA had funds to help them, they were penalised, not given initial assistance, the first second phase, which they funded with their own money. Why could this happen?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Beruas, he is concerned about the problems in his area with RISDA. In fact, I am only answering what the Honourable Member raised, which is the matter of the golf course development. In our records, RISDA was not involved in matters relating to the development of that golf course. Full stop. As for the others, the Honourable Member can provide information...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

That RM400 million is what went missing. That is why it was RISDA's money for smallholders to replant.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay, I recall this issue as one separate issue. If possible, I want information from the Honourable Member for Beruas so that I can take action and see where the mistake was.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

This is an old issue. [The House is in uproar]

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

I know, but to me...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

I want to know what action has been taken? This is a statement that has been known to the public for six or seven years. People already know.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

It doesn't matter. I want to...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Action against the officers. Now the issue is not that this money cannot be recovered. The action taken against the officers so that new officers will not make the same mistake, using RISDA's money for...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Okay, Honourable Member.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Another issue: why did RISDA not provide replanting assistance because RISDA had no money, and smallholders also used their own money first to replant.

Dato’ Haji Hasan bin MalekUMNO · BNKuala Pilah

Okey.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Minister, sit down first. I want to say a little. I would like to draw the attention of all Honourable Members, including the Minister, it does not matter, this House is all ours. Under Standing Order 35. Let me read it. "A Member who wishes to speak shall rise in his place and when called by the Chairman shall stand and address his speech to the Chairman." That includes the Minister.

Dato’ Ngeh Koo HamDAP · PHBeruas

Minta maaf.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

So, if we... It is not just one Honourable Member. If we face the person asking, we naturally invite his reply. So, our interaction is wrong according to the rules. Honourable Member, please.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

In that case, I apologise to Beruas.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Mr Chairman, I will only discuss or answer the question raised by the Honourable Member for Beruas, namely the issue...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Yes, the answer is directed to me, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Yes, Honourable Member, I agree with the Honourable Mr Chairman. I accept it. For that answer, I think I need information and can give it to me after this

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

so that I can then see what the problem with that is. But do not later – if there is none, I will sue the Honourable Member. [Laughter] The Honourable Member for Hulu Terengganu raised the issue of the estate mentioned earlier that was developed by RISDA and FELCRA for 30 years, it was found that the debt is still not settled and wants to know when it can be returned to the villagers. The FELCRA Berhad policy has never prevented the return of developed projects, provided that participants settle the development cost debts that were spent first. As for RISDA, land that has been developed and managed by RISDA as a mini estate for 30 years ago has had its debts written off with RISDA only. This is because the assistance at that time was insufficient and was financed using government loans. RISDA has settled. It is the government's side that is still not settled.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Has not answered the question.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Jerai, the Honourable Member for Kuala Selangor and the Honourable...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Mr Speaker, my question earlier.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Batang Sadong asked about the activities...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaaf.ar)EN

Let him finish first, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Under the Mega Rural Leap Programme (PLMLB)...

Dato’ Ngeh Koo HamDAP · PHBeruas

Pasal RISDA...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

No. Wait for him to finish his outline first, then ask.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

I want to ask about RISDA. The rural issue is finished. I want to ask about RISDA.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Yes, Honourable Member. There is no problem with that.

Dato’ Ngeh Koo HamDAP · PHBeruas

Okey.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

This is an integrated and comprehensive holistic programme, which has a two-pronged objective, namely eradicating rural poverty through increasing income. In addition to developing backward, remote and neglected areas by integrating three main components, namely the economic component, plantation estates such as rubber and oil palm. The second component, the physical component such as houses, roads, water and electricity supply, and third, the human capital component such as entrepreneurship courses, training and skills, and mindset change courses. Under the Ninth Malaysia Plan, a total of RM196 million was allocated under this programme for the implementation of 10 agropolitan projects under PLMLB, the mega leap just mentioned, and the implementation of these projects will be continued in the Tenth Malaysia Plan with an allocation totalling RM109 million. The main criteria for selecting the location of agropolitan projects under PLMLB are: (i) the number of hardcore poor rural household heads in the district or state being high; and

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

(ii) the readiness of the state government to provide land for the development purpose of this project. Accordingly, for the time being there is no agropolitan project under PLMLB that will be implemented in Kuala Selangor. However, the Honourable Member's views will be considered in future if the criteria are met and there is sufficient allocation.

Dato’ Ngeh Koo HamDAP · PHBeruas

[Bangun]

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

The Honourable Member for Beruas, please stand, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Sri Aman wished to include the existing paddy cultivation component around the Batang Lupar Agropolitan Project area. This project focuses only on main commodity crops such as rubber or oil palm on an area of 1,595 hectares, implemented by FELCRA Berhad as the implementing agency. The Ministry focuses on oil palm and rubber commodity cultivation in the implementation of agropolitan projects under the Mega Rural Leap Programme (PLMLB) given the stable market price, and this should guarantee sustainable and secure returns to project participants. With the area approved by the state government, the Batang Lupar Agropolitan Project, Sri Aman, is expected to benefit 319 participants in the Sri Aman division. The Honourable Member for Padang Terap and the Honourable Member for Jerai raised the issue of KEDA. For the Honourable Member's information, the land area under KEDA's control is 1,861 hectares. The KEDA life extension status system has received positive feedback from both the Federal Government and the state government. Three representatives of the state government have been appointed to the KEDA Board of Directors, namely the State Secretary of Kedah, the State Director of Lands and Mines of Kedah and the State Rural Exco of Kedah. With the appointment of these state government representatives, issues arising with KEDA, especially those involving state government jurisdiction such as land issues, have been able to be discussed and resolved. With regard to the issue of ownership...

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang Terap

Tuan Pengerusi.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Land ownership titles, houses of KEDA participants. I will come back later. KEDA has applied to the land and district office to grant land ownership titles to KEDA participants and some of these applications are still in process at the land and district office. There are also land ownership titles still not settled following arrears of house rental payments by KEDA participants that have not yet been settled. There is a problem there. According to current practice, Members of Parliament are indeed involved in the planning of KEDA projects, which will be called for discussion from time to time according to needs and project applications. The Honourable Member for Padang Terap.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Thank you Mr Chairman, thank you Honourable Deputy Minister. Firstly, my question relates to the status of appointments.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Has the Federal Government confirmed the extension of the KEDA agreement, which was supposed to end next year, has it already

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

confirmed the appointment of all three state government representatives as mentioned by the Honourable Deputy Minister. Secondly, regarding the status of the houses occupied by KEDA participants just now, for example at KEDA Kampung Bagan there is confusion there. The participants have raised with me the actual status of the house price, when they will get ownership titles, and at the early stage some of them paid, some did not pay, and they received new information that there will be an increase in the price of those houses. So this confusion arises. I give the example of Kampung Bagan just now. I ask the ministry to look into this matter. Thank you.

Dato' Ngeh Koo HamDAP · PHBeruas

[Bangun]

Mr Chairman (Datuk Dr. Wan Junaidi Tuanku Jaafar)EN

Honourable Member, I think the Honourable Member for Beruas has stood up twice.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

No, I have already gone far with this, Honourable Member.

Dato' Ngeh Koo HamDAP · PHBeruas

Sebab tadi you, kalau boleh you jawab, you jawab. Kalau tidak boleh.

Mr Chairman (Datuk Dr. Wan Junaidi Tuanku Jaafar)EN

Don't be like that, Honourable Member, your time is up.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Okay. Won't you answer my question?

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Padang Terap. The question regarding KEDA just now, in fact the appointments have already been made, agreed upon and have already started, and moreover they have already carried out their responsibilities as Board Members representing the state government or the Federal Government, it has already been operating. For the matter concerning the status of houses at Kampung Bagan specifically, I need information so that I can help the Honourable Member to overcome that confusion and so on. So if there is confusion, many people will lose out. Therefore I need a notice and, God willing, we will help. The Honourable Member for Beruas.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Thank you. The question I raised in my speech earlier about RISDA has not yet been answered, namely why smallholders were penalised or fined for replanting with their own money when RISDA at that time had no money? So, will this policy continue, or if possible I suggest to the government that if smallholders whom we say work hard, have their own initiative, and use their own money to replant, then when the money arrives, their expenditure should be reinvested, with respect. Can this policy be made, because it is not fair to those who take the initiative to replant with their own money?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

I have already mentioned earlier that I was answering the issue raised by the Honourable Member regarding the golf course. I have already answered that. So the issue raised by the Honourable Member for Beruas just now is rather different. I need information from you, provide complete information and I will look into this matter.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Honourable Member, this issue is in my speech.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

It does not matter, it is not in my answer. Sorry.

Dato' Ngeh Koo HamDAP · PHBeruasEN

If the officers did not write it down, I will show the Hansard that I did raise this issue.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

If so, I will look again at the issue raised by the Honourable Member for Beruas and we will try to find a way to resolve it.

Dato' Ngeh Koo HamDAP · PHBeruas

Terima kasih.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you. Are you satisfied?

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang Terap

Tuan Pengerusi.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Sri Aman raised the issue of agricultural roads on the rubber estates of the Sarawak Land Development Board (LKTS) that are not properly maintained. For the Honourable Member's information, LKTS only implements the Mini Oil Palm Estate Programme. The scope of this programme covers aspects of commodity planting and the provision of estate infrastructure such as the construction and maintenance of agricultural roads.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Honourable Deputy Minister.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Therefore, the allocation provided is RM3.8 million, which will be used for this purpose. The Honourable Member for Hulu Terengganu, meanwhile, requests that...

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Deputy Minister, can you give me a little?

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

The Honourable Member for Padang Terap.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Padang Terap, back to you.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Thank you, Mr Chairman. Following on from the question of the Honourable Member for Beruas just now, I raised in my debate the question of whether the ministry intends to give small planters who do not have land titles an opportunity. If possible, could a programme be reintroduced, such as one in which the premium is paid by the Federal Government at the initial stage, so that small planters who do not have land titles can eventually be absorbed as RISDA participants and receive the facilities provided by the ministry. I asked in my debate yesterday.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you, the Honourable Member for Padang Terap. For the ministry and the government, as long as this provides convenience, comfort and ease to our people, we will consider it. So the issue raised by the Honourable Member just now, I will look at again, and we will try to find a way for us to pay the premium first, and after that we will distribute it, God willing, we will work on it. The Honourable Member for Hulu Terengganu requested that the management of individual boats operating at Tasik Kenyir not be taken over by KETENGAH management when Tasik Kenyir is declared a tax-free area. The ministry will ensure that KETENGAH takes this matter into account in the development planning for Tasik Kenyir as soon as it is declared a tax-free area, God willing. Mr Chairman, the development of infrastructure, utilities and social amenities, its first programme being the village road programme. The Honourable Member for Kapit and the Honourable Member for Kuala Krai requested that the implementation of village road projects be increased. For the information of the Honourable Member, and in 2010,

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

the ministry implemented seven village road projects in the Kapit Parliamentary constituency involving an allocation of RM0.45 million, while for the Kuala Krai Parliamentary constituency there were four village road projects involving a total cost of RM0.67 million. All these projects are in the construction process and are expected to be completed in early December 2010. For 2011, the distribution of projects will be made according to the allocation and needs approved.

[Bangun]

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Kapit. I still have a lot more to answer, Mr Chairman. A little, okay.

Mr Chairman (Datuk Dr. Wan Junaidi Tuanku Jaafar)EN

Summarise, Honourable Member, there is no need to narrate the background.

Yes, this is also necessary, Mr Speaker, because otherwise it won't get through. This village road project is really needed in my constituency of Kapit, because the Kapit area is downstream from Bakun. So recently, now that there is a slight dry spell and now they are also trying to fill the Bakun dam, we in Kapit have a shortage of flowing water. Because of that, the residents of the longhouses along the tributaries, we are short of water. So our journeys, which usually use water, are now extremely difficult and troublesome. We need this village road project, and Mr Chairman, my request is whether in 2011 the budget we are discussing can be allocated a bit more, not just a little more, but much more to the Kapit area. That is all I wanted to say, and I ask that it not be a matter of decimals of millions; we want millions. Can the Honourable Minister give a guarantee? Thank you.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

I think it would be best for the Honourable Member to ask the Members of Parliament about the proportional distribution of needs and requirements. Otherwise, some will get and some will not get. Please, Honourable Member.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

God willing, we will give attention to the request from the Honourable Member for Kapit, because I did mention earlier that it is based on needs and also on the allocation available. The Honourable Member for Jerai, the Honourable Member for Sri Aman, the Honourable Member for Sibu and the Honourable Member for Padang Terap have raised the issue of roads built and upgraded being completed quickly with good quality. I am also like the Honourable Member for Kapit just now. The construction specifications for rural roads are based on the standards set by JKR, namely R1, R2 and R3. For road repair work, the allocation is channelled by the Ministry of Finance through the programme Malaysia Road Registration Information System, with permission, or MARIS, to the state governments. Therefore the Honourable Member may apply for the repair of these roads to their respective state governments. With reference to several applications for rural roads by the Honourable Member for Rembau, the Honourable Member for Lipis, the Honourable Member for Lubok Antu and the Honourable Member for Paya Besar, these applications will be listed under the Tenth Malaysia Plan and will be considered by the ministry based on the allocation received and urgent needs. We emphasise this strongly.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Deputy Minister. Mr Chairman.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Padang Terap.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

I have also listed them. I request that the ministry look into this, because in the list of answers given by the Honourable Deputy Minister, Padang Terap was not mentioned for that repair. Thank you.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay, thank you. We will include Padang Terap as well.

Tuan Mohd. Nasir bin ZakariaPAS · PRPadang TerapEN

Thank you, Honourable Deputy Minister.

Dato' Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Parit Sulong requested that the ministry inform the latest status of the implementation of the Parit Laman-Kangkar Merlimau Bridge Project, Johor. For the information of the Honourable Member, at this time the process of re-evaluating the tender is being carried out by JKR, and the project implementation is expected to begin in early 2011. We can monitor it together.

Dato' Noraini binti AhmadUMNO · BNParit SulongEN

Mr Chairman, may I ask a little?

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Please summarise. The Minister has already told you, his answer is long enough.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Yes. Thank you, Mr Chairman, and thank you also for what the Deputy Minister said just now. Only I want to know why, when it was tendered the other day, the contractor selected did not want to implement the project that had been given. I am surprised how this tender was opened and how this contractor was selected, because if he is not able to implement it, why did he enter the tender? Because this will make things difficult for the villagers. We, especially I as the people's representative and the village residents, were told early, and it has been made a local issue by irresponsible groups. Thank you very much.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

That's it. When it comes to development, talking is easy, but when it comes to implementing, there are all sorts of obstacles we have to face. However, on technical matters and tender matters, it is indeed carried out transparently. Nevertheless, it could not be carried on, so we have to re-tender. Although this matter has already been carried out, God willing, it will begin to be implemented early next year. If the Honourable Member still faces any problems, God willing, invite me and I can meet the residents there to show how concerned the Honourable Member for Parit Sulong is for the people there, so that they do not blame the Honourable Member. Thank you. Rural electricity supply. The Honourable Member for Sri Aman, the Honourable Member for Rembau, the Honourable Member for Paya Besar, the Honourable Member for Padang Terap, the Honourable Member for Putatan, the Honourable Member for Kota Belud, Lubok Antu, the Honourable Member for Parit Sulong, the Honourable Member for Kapit, the Honourable Member for Batang Sadong, the Honourable Member for Hulu Rajang, the Honourable Member for Tenom, the Honourable Member for Sibuti have touched on rural electricity supply. The government, within the National Key Result Area (NKRA) period beginning in 2010 until 2012, has targeted achieving electricity supply coverage of up to 90% in the state of Sarawak. To achieve this target, a total of 77,800 additional houses will be connected to 24-hour electricity supply in the state of Sarawak, including in the Parliamentary constituency of Sri

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Aman. Specifically for the Sri Aman Parliamentary constituency, in 2011 the ministry will begin construction work on the main intake substation, or PMU, Lacau. Sri Aman, which will be the catalyst for the extension of electricity supply to Sri Aman – Lacau – Sri Aman, will be completed at the end of 2012 and is expected to resolve the problem of electricity supply drops in Sri Aman. The ministry also implements BELB projects...

Datuk Dr. Marcus MojigohUPKO · BNPutatan

[Bangun]

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Alternative systems in interior areas that are not accessible by the grid line.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Excuse me, please let me pass.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

In 2011, the ministry plans to implement the BELB project, a hybrid solar station in Bario, Sarawak, involving 11 villages, with a total cost of RM80 million. The project is expected to begin in February 2011 after the procurement process is completed by the ministry. The Honourable Member's friend for Putatan.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Thank you, Honourable Member...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Yes, be brief, Honourable Member. If possible, I would like the Honourable Deputy Minister to finish this answer by 1.00. Yes, please, Honourable Member.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Thank you, Mr Chairman. This is a question about rural electricity supply. I have touched on one Rural Electricity Supply Project that has been implemented by the ministry. This is not in my constituency, but in an area I visited during my outreach programme in Kampung Motomou, Ulu Apin-apin, which is not far from the Pensiangan constituency. I understand that the electricity poles and wiring have already been installed. I saw that they were built two years ago. Unfortunately, however, the connection from house to house has not yet been carried out. What is the ministry's problem with the houses where the residents are still waiting for the next action from the ministry? What is the actual problem?

Datuk Siringan GubatUPKO · BNRanauEN

Can you add a little more?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Putatan. I think there was an answer from me.

Datuk Siringan GubatUPKO · BNRanauEN

The Honourable Deputy Minister...

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Based on the ministry's check, I have never been there, but according to the ministry's check, all BELB projects implemented by the ministry have been completed, have begun operating, and village residents have received electricity supply. Regarding the issue of electricity poles in Kampung Motomou, Keningau raised by the Honourable Member, the ministry will check this matter again with Sabah Electricity Sdn. Bhd. (SESB), because there were also connections of electricity supply to villages or additional houses made by SESB itself. If this matter is true, the ministry will ask SESB to take immediate action so that the lines that have been built can begin to function and village residents can enjoy electricity supply. That is the situation today. I will look into it, and let us try to go together to this area, Honourable Member. God willing, we will try.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Regarding the suggestion of the Honourable Member for Rembau that the BELB programme guideline, which stipulates that only 30% of new settlement areas that have been inhabited be connected to electricity supply, be changed. The BELB programme guideline stipulates that 30% of residents in new settlement areas must build their houses before being connected to electricity supply. This matter is to prevent the structural facilities built from being damaged, because the houses are not built by the landowners. However, separate consideration, case by case, will be made for approval after taking into account the prospects of the developer of the settlement area concerned, God willing. The Honourable Member for Padang Terap touched on an explanation of the ministry's strategy to connect electricity supply to remote areas where the number is very small. The BELB programme is implemented through two methods, namely grid line connection and supply sources from the state electricity authority, namely Tenaga Nasional Berhad in Peninsular Malaysia. For interior areas that are inaccessible and not economical to connect using the grid line, electricity supply will be provided using alternative methods such as hybrid solar and micro-hydro systems that have been proven effective and are accepted by the state electricity authority. The Honourable Member for Putatan, I have already mentioned it earlier. The Honourable Member for Kota Belud also proposed that the ministry supply water pump lights to interior village areas that cannot be connected to 24-hour electricity supply in the near future. The ministry plans to resolve the issue of electricity supply to interior areas nationwide holistically. To achieve this target, implementation of projects is being increased either through grid line connection or by using alternative systems such as hybrid solar or micro-hydro, as I mentioned. Accordingly, the ministry cannot consider the Honourable Member's proposal to supply water pump lights to interior villages because this matter is outside the scope of the Rural Electricity Supply (BELB) programme. However, the ministry will from time to time explore the potential of new alternative technologies to provide electricity supply to all residents in interior areas. The Honourable Member for Lubok Antu wishes to obtain an explanation from the ministry regarding the implementation of the BELB project in Lubok Antu, which involved a right of way issue from SALCRA being cancelled without first referring to the Member of Parliament in the area concerned. For the information of the Honourable Member, the implementation of the BELB project in Lubok Antu which involved the right of way problem from SALCRA was not cancelled but postponed to 2011. This decision was made after SALCRA did not allow the felling of oil palm trees on their estate. Discussions with SALCRA, SEB and the Sarawak Public Amenities Ministry (KKA) were held in September 2010, and SALCRA emphasised that it could not allow the felling of approximately 2,000 oil palm trees for the implementation of the BELB project. This is one of the obstacles I mentioned earlier in developing rural areas. As a result of discussions with SEB and KKA, the ministry postponed the implementation of this project to 2011 and will use underground cables to reduce the number of oil palm trees to be felled. The ministry expects that the project implementation will begin in May 2011 and will be completed in December 2012.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Kapit also requested an explanation from the ministry as to whether the Kapit area can be connected to the grid line in the near future. With reference to the plans of Sarawak Energy Berhad (SEB), the 132kV transmission line from Sini Lajau to Kapit is expected to be completed at the end of 2014. If this intermediate line is completed by SEB, the ministry expects that most of the villages in Kapit will be able to be connected to electricity supply using the grid line. For villages that are too far in the interior, the ministry will continue implementing the alternative BELB programme using micro-hydro systems in potential areas. Regarding the Honourable Member's proposal that the ministry connect electricity supply from generator sets installed at schools, it is informed that this matter was discussed with the Ministry of Education Malaysia (KPM) on 15 September 2009.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Based on feedback received from KPM, it was found that this proposal could not be continued because the generating capacity of the installed generator sets could not meet the electricity demand of village residents. Accordingly, the ministry also cannot consider this proposal and will continue implementing the BELB project to connect electricity supply to interior areas that still do not have electricity supply. The Honourable Member for Batang Sadong, also not in the House, raised the issue of several villages in his Parliamentary constituency that have not received electricity supply even though the poles and electricity lines have been completed. The entire BELB project – the Honourable Member for Batang Sadong, he is not here, so I have skipped him. The Honourable Member for Hulu Rajang has requested that the ministry consider connecting supply from Bakun to the resettlement area of Kampung Asap, Hulu Rajang. Is the Honourable Member for Hulu Rajang here?

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

He is not here, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Not here, I'll skip him. The Honourable Member for Tenom raised the issue that there are still six villages – is the Honourable Member for Tenom here? Not here either, I'll skip him.

Datuk Raime UnggiUMNO · BNTenom

Ada.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

The Honourable Member for Tenom is here, Honourable Member.

Datuk Raime UnggiUMNO · BNTenomEN

Over here, Honourable Deputy Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Oh! Sorry.

Datuk Raime UnggiUMNO · BNTenomEN

Are you listening to this?

Dato’ Haji Hasan bin MalekUMNO · BNKuala Pilah

Minta maaf.

Datuk Raime UnggiUMNO · BNTenom

Okey.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Tenom raised the issue that there are still six villages in Rundum that have not been connected to electricity supply. The priority list of BELB projects in the state of Sabah was finalised by the Sabah Rural Development Ministry and SESB after taking into account the electricity supply capacity in a particular

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

area. The connection of electricity supply in the Rundum, Tenom area could not be implemented in 2010 and 2011 because of the issue of load drop from the SESB main line specifically for the Tenom Parliamentary constituency. A total of RM18 million has been allocated for the implementation of 35 projects in the Tenom Parliamentary constituency. Project implementation is expected to begin in January 2011 and is expected to be completed in 2012, God willing. Regarding the proposal for the implementation of the project...

Datuk Raime UnggiUMNO · BNTenomEN

Thank you, Honourable Deputy Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala Pilah

Ya?

Datuk Raime UnggiUMNO · BNTenom

Terima kasih.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

You're welcome. Regarding the proposal to implement the Rural Electricity Supply (BELB) project using solar systems, it is informed that from 1995 to 2010 the Ministry of Rural and Regional Development (Kementerian Kemajuan Luar Bandar dan Wilayah, KKLW) installed a total of 3,155 solar photovoltaic systems involving 75 villages in the state of Sabah. All these systems are maintained regularly by KKLW and users receive four to six hours of supply a day free of charge. Where can you find a government like this? Starting in 2004, KKLW in turn implemented hybrid solar systems throughout the country. Relatively speaking, this system is better than solar photovoltaic systems because it is able to supply electricity for 24 hours. Hybrid solar systems involve a combination of energy generation and solar energy, battery storage and generator sets. To date the ministry has implemented nine hybrid solar projects in Sabah worth RM102.5 million, involving 22 villages, and has been able to benefit 1,863 houses. Some of them are possibly in the Honourable Member's own area. The ministry plans to continue implementing hybrid solar projects in the state of Sabah in the future in an effort to improve quality of life and supply in rural areas. Honourable Member for Sibuti, are you here? Okay. Raising the issue of frequent electricity supply disruptions in his area. For the Honourable Member's information, the issue of frequent electricity supply disruptions in Sibuti falls under the responsibility of Sarawak Energy Berhad. The ministry will forward this matter to SEB for further action. Thank you for your concern. Village street lights. Regarding the proposal raised by the Honourable Members for Rembau, Paya Besar, Parit Sulong and Batang Sadong, it is informed that the village street light installation programme was decided by the Cabinet meeting dated 2 August 2000. The implementation of this project is on a one-off basis, carried out in stages, involving the installation of a maximum of 10 lamps in a village throughout the country, and the operating and maintenance costs are borne continuously by the government.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

I want to ask a little.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Rational... Wait a moment. The rationale for the Village Street Light (LJK) project is to brighten the coverage area so that economic, social and recreational activities can be carried out at night comfortably and safely. They are installed on existing electricity poles, such as in front of community halls, places of worship and at road junctions.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The list of LJK installed by the ministry is finalised at state level by the State Development Office (Pejabat Pembangunan Negeri, PPN) after being discussed and coordinated with the District Office. All LJK installed by TNB are from the list that has been coordinated and finalised at state level by PPN. That means the ministry cannot be blamed. Regarding the proposal that the quantity of LJK installed depends on...

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Mr Chairman, I want to ask about street lights.

Dato’ Haji Hasan bin MalekUMNO · BNKuala Pilah

Nanti sekejap.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

That is already another topic, Honourable Deputy Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Wait, let me finish a little. This is about street lights. Regarding the proposal that... Even the women are impatient, yes. Regarding the proposal that the quantity of LJK installed depends on the size of the village, the ministry will study and examine this proposal for consideration in the future. If there is a need and it is appropriate, the ministry will consider making slight changes to the LJK programme in the future. Please go ahead.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman, and thank you also to the Honourable Deputy Minister. Just now the Honourable Deputy Minister said that the procedure is 10 street lamps for one village. However, our problem now may be a policy made perhaps 10 to 20 years ago. Now a village has become very many satellite villages, and these satellite villages are big. I give an example in my area: the main village alone is seven kilometres, and it is further divided by a major road. There is Kampung Bintang Laut, Kampung Bintang Darat, for example. After that, there are satellite villages two to three kilometres long, full of residents and closely packed. When only one village, the main village alone, receives it, what about the satellite villages? Therefore I propose that, in my speech during the Committee debate the other day, consideration be given to ensuring these satellite villages are also taken into account to receive the 10 village street lights for each satellite village. I have discussed with the District Office... Mr Chairman, this is brief only.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Member, do not speak any further, Honourable Member. I would like to ask the Honourable Deputy Minister to finish by 1.00 p.m., Honourable Member.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Okay. I hope this will receive attention from the Honourable Deputy Minister regarding the proposals I have given just now. Thank you.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay! Insya-Allah, the ministry will give serious consideration to the proposal from the Honourable Member for Parit Sulong. Now we move on to Rural Water Supply (Bekalan Air Luar Bandar, BALB). The Honourable Member for Hulu Rajang applied for the supply to be – is the Honourable Member for Hulu Rajang here? Not here, is that right? I will go straight to the next. The Honourable Member for Paya Besar raised the issue of water supply– The Honourable Member for Paya Besar is always in the House – raising the issue of water supply in Kampung Permatang Badak Baru, which still uses water supply from a pond. For the Honourable Member's information, according to the ministry's list, the proposed water supply project is in Kampung Baru Yahya Sheikh, Permatang Badak, with an estimated cost totalling

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

RM300,000. Its implementation is in 2011 and 2012, and it will be carried out. The Honourable Member for Padang Terap. Oh! He is not here, is that right? Okay, I will go to another. The Honourable Member for Rembau? Ha! Friend is here. The Honourable Member for Rembau applied for clean water supply in the Rembau Parliamentary constituency to be considered. The ministry takes note of the Honourable Member's application and will be considered under the implementation for 2011 and 2012. Insya-Allah, we will consider it. Congratulations to all of them. The Honourable Member for Kuala Krai raised– The Honourable Member for Kuala Krai? Not here, is that right? I will go to another. The Honourable Member for Kota Belud? Not here. The Honourable Member for Bintulu? Not here either. The Honourable Member for Sri Aman? Not here, is that right? Okay. The Honourable Member for Kuala Selangor? Not here. Ha, if he is not here, I cannot do anything– if he wants the answer tomorrow, he can come and see me, I will supply it. The Honourable Member for Batang Sadong? Also not here. The Honourable Member for Kapit?

[Bangun]

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Regarding the application of the Honourable Member for Kapit for the installation and use of water pipe replacement for connection from the Kapit water treatment plant, for the Honourable Member's information, pipe replacement is outside the scope of the BALB programme and can be applied directly to the Ministry of Energy, Green Technology and Water (Kementerian Tenaga, Teknologi Hijau dan Air, KeTTHA), not to our ministry. You may apply to KeTTHA, yes. As for the alternative water supply issue, to be upgraded as the supply has been damaged, the alternative water supply in the Kapit Parliamentary constituency for 2011-2012 is 40 projects with an estimated cost of RM3 million, for Kapit. Social Amenities Programme, the Honourable Member for Beruas. Has he left? Oh! He wanted to ask a question just now? Okay. The Honourable Member for Silam, the Honourable Member for Batang Sadong, the Honourable Member for Hulu Rajang and the Honourable Member for Sibuti raised that there are still many social amenity needs in their respective Parliamentary constituencies and applied for the allocation for the Social Amenities Programme (PAMS) to be increased to meet these needs.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The ministry is aware that there are still many social amenity facilities needed in rural areas, particularly in rural areas of Sabah and Sarawak. Therefore, the ministry will try to fulfil the wishes of the Honourable Members. Majlis Amanah Rakyat (MARA). The Honourable Member for Tenom raised the issue of the construction of a Giat MARA in Tenom. I myself have also gone to take a look together with the Honourable Member for Tenom himself. For the Honourable Member's information, the allocation to implement Giat MARA Tenom will be made as soon as the change of land-use conditions by the Department of the Director-General of Lands and Mines Putrajaya is completed. There is a land problem here – once it is completed, we will implement it, because the money allocation is already available at MARA. At present, the Giat MARA is operating temporarily since May 2002 in the building of the Murut Cultural Centre. I myself have gone to see the place. For the time being it is fine, but for– what we visited just now has to be resolved first. In this connection I need the assistance of the Honourable Member for Tenom so that it can be referred back, this land matter with the District Office and so on. However, according to my report during the visit, the Pejabat Panah said there was no problem. However, this is what I mentioned just now, the problems we face. Insya-Allah, we will rearrange it again.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Honourable Member – thank you for that concern. The Honourable Member for Putatan raised the issue of how graduates of Giat MARA training can obtain Grade F contractor licences and the Business Financing Programme for Giat MARA training graduates. For the Honourable Member's information, the management of Giat MARA always assists Giat MARA training graduates who have the potential to become entrepreneurs or contractors by providing guidance and advisory services, and submitting their applications to the PKK (Pusat Khidmat Kontraktor, Contractors Services Centre) and the CIDB under the supervision of the Ministry of Works (Kementerian Kerja Raya) to obtain Grade F contractor licences. We have courses, yes. For the Honourable Member's information also...

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Honourable Deputy Minister.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

...MARA indeed provides business financing facilities to Giat MARA training graduates who are interested in venturing into business. Honourable Member for Putatan.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Yes. Mr Chairman, I respect the Honourable Deputy Minister's answer regarding the ministry's concern for trainees who have already been trained. But unfortunately, what actually happens, Honourable Deputy Minister, is that many of those who have been trained find it difficult to obtain licences. This is the complaint of those who have been trained. No one who has applied has ever obtained an F licence until now. This is because the Grade F licence has been frozen. So, is there an effort by the ministry to give these people an opportunity so that we can produce more entrepreneurs at the grassroots level, especially in agriculture-based produce? What is happening now is that we speak nicely here, Honourable Deputy Minister, but what happens is that the people hear the answers but it seems it is not really so.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you, Mr Chairman, for the Honourable Member for Putatan's concern about the licence just now. In fact, the matter of the Grade F contractor licence is under the supervision of the Ministry of Works, whether through the PKK or the CIDB. We will raise this and inform the ministry concerned so that it is seen as a need of our young people to register. I support the views of the Honourable Member just now and will help. The Honourable Member for Batang Sadong is not here. The Honourable Member for Sibuti is always here – it is fine, he is already well, he is healthy – good. The Honourable Member for Sibuti urged MARA to speed up the establishment of Giat MARA in Sibuti. Under the Tenth Malaysia Plan, the establishment of Giat MARA Sibuti has been approved an allocation of RM1.191 million. Giat MARA will begin operating promptly. Alhamdulillah, good news for Sibuti. The Honourable Member for Rembau proposed that the number of MARA Junior Science Colleges (Maktab Rendah Sains MARA, MRSM) Ulul Albab be increased, especially in Rembau. The ministry takes note of this proposal and will make detailed planning to expand the Ulul Albab programme in the future. Thank you, Honourable Member for Rembau. We know, it is not only MRSM but there are also other bodies organising that interactive course, and insya-Allah, we will give special attention to the Honourable Member's own wish in Rembau. Regarding the application for the construction of an MRSM and a MARA Arcade in Labuan, MARA will carry out a detailed study on the matter. The Honourable Member for Hulu Terengganu raised the issue of the MARA building in Pekan Ajil which has been completed for two years but is still not operating. For the information of the Honourable Member, the building is still not fully completed because there are defects. In connection

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

with that, MARA has appointed a third party to repair the defects and it is expected to be completed at the end of this year. As I mentioned just now, these are small problems but we cannot develop it. Insya-Allah, it will be completed at the end of this year, Honourable Member. If it is completed tomorrow, call me to officiate. The Honourable Members for Rembau and Padang Terap raised the issue of business loan approval offer letters being issued but payment being received late by borrowers. The delay in payment to new applicants has been overcome for the short term when the government channelled additional allocations totalling RM100 million through the Economic Stimulus Package (PRE) and RM60 million through the Public Transport Fund, compared to the RM300 million approved under the Ninth Malaysia Plan. MARA also uses loan repayment collections to meet the increase in MARA financing applications, and has issued a letter of undertaking to every new applicant to inform them that there will be a delay in financing if MARA financing is approved. Must be patient. The Honourable Member for Padang Terap – no longer here, still outside. The Honourable Member for Rembau and the Honourable Member for Lipis requested clarification on the scope or focus of the fields of study provided under the Higher Education Loan Fund (HELP III), the level of loan repayment after completion of studies for the target group of HELP III fund recipients, and the return of investment from the RM57.4 million allocated. For the Honourable Member's information, HELP III is a Government-to-Government (G2G) programme between the Malaysian government and Japan, where allocations are channelled to MARA and the MARA Student Foundation (Yayasan Pelajar MARA) as implementing agents. This programme is very good because it focuses on science and mechanical, technical and electronic engineering studies at degree, master's and PhD levels. Under this programme, students are fully sponsored and no repayment is charged to students who complete their studies. As for the target group for the HELP III programme, it is outstanding SPM (Sijil Pelajaran Malaysia) leavers. ROI for this programme: the country will obtain a highly prudent workforce in the fields of science and engineering. We will try to make the Honourable Member's hope a success.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Member, there are three minutes left, can you manage?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

We have to finish this. If not, Mr Chairman will scold us. I ask for permission. The Honourable Member for Kinabatangan – he is not here, I will skip him. The Honourable Member for Kota Raja, also not here. The Honourable Member for Kuala Selangor... [Interjection] Oh! The Honourable Member for Kota Raja is here. The Honourable Member for Kota Raja raised the issue regarding KEMAS staff who have diploma and degree-level education and a study on the achievement of children who can read before entering Year One in national schools. KEMAS diploma-level workforce is 25.7%, mainly in early childhood education. The need for this manpower is based on current needs, and KEMAS cannot appoint based on the large number of highly qualified workers who have no jobs in rural areas. The assessment of the ability of tabika children to master reading, writing and counting is carried out three times a year. The final assessment of children is made at the end of the year to see their ability to master the 4M (reading, writing, counting and reasoning). The refresher training programme during the year-end school holidays

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

is held so that they are ready to enter Year One in national schools. The Honourable Member for Kuala Selangor, not here. The Honourable Member for Hulu Terengganu raised the issue of when KEMAS will appoint a district KEMAS officer, a post that has been vacant for a long time and whose responsibilities are now carried out by a senior supervisor. At present, the planning to fill this post and other KEMAS posts is being carried out by applying for approval of the appointment from the Public Service Commission. Must be patient too, Honourable Member for Hulu Terengganu.

Tuan Haji Mohd. Nor OthmanUMNO · BNHulu Terengganu

Tuan Pengerusi.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

A few seconds left, Honourable Member.

Tuan Haji Mohd. Nor OthmanUMNO · BNHulu TerengganuEN

I think there is no need to wait for this JPA because it fills vacancies in existing posts, not for these new posts. Just send the officers, fill them. The problem is, they do not want to send them. That is all. Thank you.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The problem is that we have to request from the salary allocation and so on. The posts exist but there is no allocation for that purpose. That means the allocation for that, for allowances and so on. Tomorrow – and insya-Allah, this will be implemented early next year, Honourable Member.

Tuan Haji Mohd. Nor OthmanUMNO · BNHulu TerengganuEN

Okay, but there was one before.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

This includes Hulu Terengganu, we will supply, insya-Allah. Orang Asli affairs – Mr Chairman, I ask for permission because this... The Honourable Member for Sungai Siput raised whether the department...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Member, if it is not finished, I have to stop here too, Honourable Member. I am not able to continue in this afternoon session.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay. The others, Honourable Member – on this matter, Orang Asli affairs, and then I ask for permission, if it is not possible, I will stop and I will reply in writing to the Honourable Member for Sungai Siput and also the Honourable Members who...

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Can the Honourable Member finish in a few minutes?

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

A little more, Mr Chairman.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

No, no. Tell me, and I will know later.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

The Honourable Member for Beruas and the Honourable Member for Paya Besar also raised it. So, I will give it in writing.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

I think we will continue this afternoon.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

There may be many more things to ask.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

What can we do, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala Pilah

Okey, insya-Allah.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Because the Honourable Member who takes interruptions from people, then he must answer.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Okay, God willing, I will continue.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

But do not be late. We are already behind schedule, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Yes, I understand.

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Please, Honourable Member.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you, Mr Chairman. Can I continue?

Mr Chairman (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

No, continue after lunch.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

Thank you, Mr Chairman. [The House resumed sitting] [Deputy Speaker (Datuk Dr. Wan Junaidi bin Tuanku Jaafar) chaired the Sitting]

Deputy Speaker (Datuk Dr. Wan Junaidi bin Tuanku Jaafar)EN

Honourable Members, the morning session has been adjourned and the House will resume sitting at 2.30 pm later. [The sitting was suspended at 1.01 pm] [The sitting resumed at 2.30 pm] [The House sat in Committee] [Deputy Speaker (Datuk Ronald Kiandee) chaired

Mr Chairman (Datuk Ronald Kiandee)EN

I invite the Honourable Deputy Minister to continue with the reply.

Dato’ Haji Hasan bin MalekUMNO · BNDeputy Minister of Rural and Regional Development I · Kuala PilahEN

Thank you, Mr Chairman. I am continuing my reply, which should have been completed before 1.00 pm earlier but was not permitted. So, I will continue. The topic I will present is related to Orang Asli affairs. I see that the Honourable Member for Sungai Siput is not here. Is the Honourable Member for Sungai Siput here? Okay. The Honourable Member for Sungai Siput raised whether the department has any plans to hand over the management of estates or plantations to the Orang Asli community, where at present the plantations are managed by the agencies RISDA and FELCRA. For the information of the Honourable Member, it is the aim of the Department of Orang Asli Affairs that plantations which have been developed or are currently managed by agencies will be handed over to the Orang Asli community through the JKKK or Orang Asli Cooperatives after a mature period. As examples, there are plantations such as at RPS Kemar; RPS Legap; PSK Chenain, Kuala Kangsar; RPS Ulu Kinta; Bukit Dugang, Selangor; and TSK Tenggalong, Rompin, which have been fully handed over to the Orang Asli community. However, the capacity of the Orang Asli community is

Dato’ Haji Hasan bin MalekUMNO · BNDeputy Minister of Rural and Regional Development I · Kuala PilahEN

an important aspect that must be considered by the department and ministry before a plantation is handed over, including obtaining the consent of the Orang Asli community involved as plantation participants. The Honourable Member for Sungai Siput also proposed that every Orang Asli family be given land titles of two acres to six acres. However, this issue is not favoured by Orang Asli NGOs such as Jaringan Orang Asal Se-Malaysia. For them, the area given is not large enough without taking into account the interests of future generations. The Honourable Member for Beruas, meanwhile, proposed the granting of individual land titles and plantations to the Orang Asli as one way for the Orang Asli to obtain a stable income. This Ministry, through the Department of Orang Asli Affairs, has intensified efforts by establishing the Policy on Land Ownership and Development for the Orang Asli as approved by the National Land Council on 4 December 2010. This is to realise the aspiration for land ownership and improved quality of life among the Orang Asli community. However, on 17 March 2010, a small number of Orang Asli community members objected to this policy. Nevertheless, based on feedback from the road show briefing sessions to the Orang Asli community, this policy needs to be reviewed by taking into account the views and proposals of Orang Asli NGOs, Orang Asli intellectuals, Tok Batin and the Village Development and Security Committees of the Orang Asli villages themselves. The Department of Orang Asli Affairs has also held meetings between the Honourable Menteri Besar and the Honourable Minister of Rural and Regional Development to discuss and refine the demands of the Orang Asli community. The states in which these were held include Johor, Pahang, Negeri Sembilan and Perak. Accordingly, this matter will be refined in a meeting with the relevant agencies before this policy paper is tabled at State Government Council meetings in the respective states. Next, it will be tabled at the Cabinet meeting before being presented to the National Land Council meeting in 2011. That means it is within our attention. The Honourable Member for Beruas - is he not here, yes? The Honourable Member for Paya Besar asked about allocations given to the Paya Besar Parliamentary constituency, including the Housing Assistance Programme (PBR). In 2010, the Department of Orang Asli Affairs allocated RM475 thousand for the construction of roads and culverts in Kampung Sungai Mas. Meanwhile, in 2010 as well, RM674 thousand was channelled through the Housing Assistance Programme (PBR) to Kampung Sungai Mas and Kampung Bukit Bangkung, involving 18 new housing units and 12 units for renovation, as follows: (i) Kampung Sungai Mas - nine new units built and six units renovated; and (ii) Kampung Bukit Bangkung – nine new units built and six units renovated. This PBR will continue to be implemented in 2011 involving eligible poor and hardcore poor groups. Lastly, Mr Chairman, I record my appreciation and thanks for the concern...

Datuk Billy Abit JooPRS · BNHulu RajangEN

Thank you, Mr Chairman. I would like to request the good offices of the Honourable Deputy Minister to touch on the matter about Hulu Rajang that I raised the other day.

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

I apologise, the Honourable Member for Hulu Rajang is not in my notes here. It is alright, God willing, I

Dato’ Haji Hasan bin MalekUMNO · BNKuala PilahEN

will check again and I will give a written reply to the Honourable Member. Thank you for that concern, God willing. So, lastly Mr Chairman, I record my appreciation and thanks for the concern and proposals of the Honourable Members on the issues of the Ministry of Rural and Regional Development in the Supply Debate 2011 at the Committee Stage. Thank you.

Mr Chairman (Datuk Ronald Kiandee)EN

Thank you. Honourable Members, the question is that the sum of RM4,425,054,000 for Purpose B.22 under the Ministry of Rural and Regional Development forms part of the Schedule shall be agreed to. [The question was put and resolved in the affirmative, and agreed to. [The sum of RM4,425,054,000 for Purpose B.22 was ordered to form part of the Schedule]

Mr Chairman (Datuk Ronald Kiandee)EN

The question is that the expenditure of RM7,931,121,000 for Purpose P.22 mentioned in the Development Estimates for 2011 shall be approved. [The question was put and resolved, and agreed to] [The sum of RM7,931,121,000 for Purpose P.22 was approved to form part of the Development Estimates 2011]

Bill — Supply Bill 2011 and Development Estimates Motion 2011 Committee — Head B.23 [Schedule] – Head P.23 [Development Estimates 2011] –Bill

Mr Chairman (Datuk Ronald Kiandee)EN

Supply Head B.23 and Development Head P.23 under the Ministry of Natural Resources and Environment are open for debate. The Honourable Member for Jempol.

Dato’ Lilah bin YasinUMNO · BNJempolEN

Thank you, Mr Chairman. Allow me to take part in debating the Ministry of Natural Resources and Environment, beginning with 050000 - Forestry. Mr Chairman, I request the ministry to act very firmly in relation to the conservation of water catchment areas. Today, water catchment areas are very important for supplying drinking water and also for supplying clean water to the people. Nevertheless, because of uncontrolled forest destruction or uncontrolled logging, a large part of our water sources have already been polluted.

Dato’ Lilah bin YasinUMNO · BNJempolEN

Sometimes these water sources also simply stop flowing, and this is a very dangerous threat to us in supplying clean water sources in the future, moreover the treatment costs for water from increasingly polluted rivers also rise, and this burdens the people in the future. Therefore, can this ministry draft a more orderly system so that it can control, or that these water catchment areas are completely stopped from logging, so as to ensure these water sources are safer and more sustainable, so that they can endure in the times to come. Every time we debate this issue, the answer that will be given is that logging is under the authority of the

Dato’ Lilah bin YasinUMNO · BNJempolEN

state government, but if the ministry does not have a specific and firmer plan together with the state government, I am confident and believe this will create problems for the country in the future. Mr Chairman, referring to the matter of Item 12000 - Forest Research Institute Malaysia (FRIM). I would like to ask the ministry whether a plan has been made by the ministry to conserve and also maintain the Sungai Penchala permanent forest reserve, Port Dickson, Negeri Sembilan. This is because I understand this forest is a very important treasure for our university students, especially for doing PhDs in the field of Forestry Research, because of this forest's uniqueness, but recently I have seen that due to development problems and lack of awareness it has begun to be threatened. So, I am confident and believe that through this ministry, something important must be done to conserve and maintain this forest, as a research site for our students in the future to enable them to be more successful in their respective fields, and this has no equal and cannot be replaced by any other area in Malaysia, including in the region of this Asian side. I understand this is an important reference in forestry research. I would like to ask, what efforts can be made by FRIM or can be made by the ministry, which is more important, to ensure this important research site will remain in the future. Second, related to this, is there a study done by FRIM on the types of forest trees suitable for planting in our forest recreation parks in the country. Today this forest recreation tourism is very popular and it provides very good returns to our country, because this tourism industry provides returns of up to RM54 billion to our country. Therefore, we can certainly offer a better and more attractive form of tourism that can be offered to forest recreation enthusiasts who travel within our country. Apart from that, can FRIM determine safe trees to be planted in our forest recreation areas? We can see that part of them, the number of standing trees in forest recreation areas is decreasing more and more, and if this is left, these areas will certainly no longer be attractive in the future. What types of trees are suitable and safe, especially since these forest recreation areas are also used as camping sites? We do not want trees that are unsafe or not strong to be planted, as they will threaten the safety of enthusiasts who use these areas for their camping activities, so that they are more beautiful and also informative for our tourists. Mr Chairman, in connection with this, I can also see that our country's landscape also requires studies that FRIM can play a role in to jointly evaluate and study what types of teak trees are suitable for planting in national landscape areas. Today, if we allow trees that are not sturdy and not durable, they threaten the safety of the people in our country. How many cars are destroyed when storms occur, these non-durable trees planted in landscape areas that are also used as places for parking cars, especially in big cities like Kuala Lumpur. I think FRIM can play its role in conducting research on what, with planning, we want to make the city a city in a forest

Dato’ Lilah bin YasinUMNO · BNJempolEN

and when we make our city a forest city, a suitable tree or suitable type must be considered for planting, not only as a safe place, but also as a good source of oxygen for city folk to live in the future. Mr Chairman, I can see that our highways also have many open areas. Can FRIM play a role in conducting research so that we can plant these teak trees in the surroundings of the North-South Expressway and so on, in order to make our highways more beautiful, and at the same time we plant durable and safe trees, and in the future we bequeath to our children, grandchildren and great-grandchildren, which trees will eventually become a source of income for our country. Imagine 100 to 200 years from now, these teak trees we nurture becoming a major source of income for our country. Mr Chairman, item 09000 - Marine Park. Port Dickson is a major tourist destination of the country, and there is also a marine park in Port Dickson. I would like to ask the ministry how much allocation has been provided to help Port Dickson to protect the treasures in this sea, because many scuba and deep-sea diving enthusiasts provide information on how important it is for us to protect, conserve and upgrade the marine park in Port Dickson so that it not only becomes a destination for visitors on this coastal area, spacious, attractive and comfortable, but the Port Dickson Marine Park must also be given good contributions. Accordingly, I can also see how important it is for us to develop and plan so that the area can be further improved in terms of facilities in the future. Item 08000 concerns irrigation and also drainage. Today, Mr Chairman, the ministry through the Drainage and Irrigation Department has already completed the Batu Kikir Drainage Master Plan, Jempol, Negeri Sembilan, in an effort to overcome the flood problems in that area. I would like to ask how much allocation has been approved to develop it, because once the master plan is completed it must be provided with allocations to enable this development to be implemented. I am confident and believe that with the allocation we are debating now, it can be given to resolve the flash flood problems that occur in that area, and will provide better comfort to the residents who live there. Second, I would like to know from the ministry, how much allocation has been provided for the Sungai Dalam Taman Project.

Dato’ Lilah bin YasinUMNO · BNJempolEN

Today I do not see any significant impact when the ministry does not focus on one particular area. I propose to the ministry that we focus on where rivers passing through towns or rivers passing through small townships are given attention so that we can enhance the river-in-park project, so that rivers flowing through towns are not seen for their dirtiness, are not seen for the problems that arise. But instead we upgrade them so they become a comfortable park that we can use as a recreational place for our society, especially in urban areas. If it can be upgraded well, with perfect activities held, I think the rivers in our towns, like in these big cities, could also be like the cities

Dato’ Lilah bin YasinUMNO · BNJempolEN

major tourist destinations such as Venice, which can offer a large number of tourists in the future. Today, when there is no focus, the allocations provided by this ministry are scattered like that, but there is no single place that we can show the results of. Therefore, I propose that the ministry instruct the responsible officers to be more focused and to concentrate on single locations so that the results can be seen better. The third matter, in connection with that, is about coastal erosion. As I mentioned earlier, very many visitors come to tour the Port Dickson area. However, today, although the ministry has already upgraded the Port Dickson beach, there are still several locations that require allocations so that these rocky beaches can be upgraded by enhancing the beach to be wider and longer, to add more visitors to hold activities in the Port Dickson beach area. Developing beaches to meet the needs of tourists is an important activity carried out by any country in this world that offers its beaches for tourism activities. It is not a natural action but based on planning and also high financial and technological resources. They reclaim land, they bring sand, they add to the existing sand and increase the quantity or total area so that tourists can hold activities. Item 040000 concerns minerals and also geosciences. I would like to get information from the Honourable Minister's ministry, what are the results of the groundwater studies that have already been carried out by the Honourable Minister's ministry? What mineral contents are present in our groundwater, suitable for us to drink, suitable for our health? Is the total amount of this water enough if we use it as a source of drinking water, can it meet the needs of all Malaysians? Mr Chairman...

Mr Chairman (Datuk Ronald Kiandee)EN

The Honourable Member. Can you finish, Honourable Member?

Dato’ Lilah bin YasinUMNO · BNJempolEN

Yes, Mr Chairman. I would also like to ask the ministry to look into this: there are many of our people who often take mineral water from the riverbank. For example, along the riverbank at Bukit Putus, Negeri Sembilan, and the riverbank at Bukit Tangga, Jelebu. Water comes out from the hill, and our people bring bottles and tanks in rows, take the water and drink it. Has the Honourable Member's ministry carried out a study on its content? Is it safe for our people to drink? I also do not know why people queue at Bukit Putus like that. When I asked, he said, "Dato', this water is good for curing knee pain." [Laughter] So, how true is the theory that these villagers hold? However, before it becomes a major problem for our people in the future, it would be good for the Honourable Member's ministry, which is responsible in this field, to study the mineral content. Officially declare this answer to the people: that the water at this location is safe to drink, or, if our study shows it is not safe, give notice that the water is not safe to drink. Thank you, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Kubang Kerian.

Tuan Salahuddin Haji AyubAMANAH · PHKubang KerianEN

Thank you, Mr Chairman. I will not take long; there are only three matters on which I want an explanation from the ministry concerned, namely the Ministry of Natural Resources and Environment. First, Mr Chairman, under Item 020000 and also 020300 on the coordination and operation of land. I have read about the roles under this heading, including the management of land administration that is also related, and it clearly mentions the Continental Shelf Act. Here, once again, I want to raise the question: is this Honourable Member's ministry taking seriously the management and administration of this Continental Shelf Act, which certainly has a connection with the issue of claims? Today it is a claim on petroleum, tomorrow there may be more claims, which I think are related to the Petroleum Development Act, 144, pioneered by the Honourable Gua Musang. So I feel that with the clear role of this ministry, which specifically mentions this management, it should also include how the Continental Shelf Act is applied. Then, how is it taken into account in ensuring that an agreement or any exploration, whether for petroleum or other mineral resources, complies with and does not conflict, particularly with the Petroleum Development Act, 144, which was developed in 1974. Here I want to give an explanation: can the Honourable Member tell this august House that when the government decided not to pay, or to deny, petroleum royalties to the Kelantan State Government, the ministry "negotiated" and took into account the views, particularly for me, when the government argued by linking it to the Continental Shelf Act? That is the first point. Second, regarding Item 030000, which is also related to survey and mapping. The issue here is that I want to draw the attention of this august House and seek an explanation from the Honourable Member's ministry. Recently the Limbang issue arose, and there are two blocks that were previously operated by Petronas, Block 'L' and Block 'M', which were then returned to the Brunei government. Does this also involve mapping? Has the national plan changed? This certainly involves the other neighbouring blocks, which are indeed in their position. If Block 'L' and Block 'M' have changed, then what is the situation of our government's jurisdiction, particularly what has been entrusted to Petronas under the Petroleum Development Act 144? This is because I think that if there is further exploration or more oil and gas areas are discovered around that area, it is certain that once Block 'L' and Block 'M' have been handed back to the Brunei Government, it will also involve the mapping issue arising from the return of Block 'L' and Block 'M' to the Brunei Government. Likewise, I want to know whether there has been an up-to-date mapping since the International Court gave Pulau Batu Putih to the Singapore Government. This also involves the issue of waters, an issue that concerns sovereignty, where Tubir Selatan is said to belong to us, and whether there is an up-to-date map on this issue?

Tuan Salahuddin Haji AyubAMANAH · PHKubang KerianEN

This is because I am very worried when I see that the victory in favour of Singapore is also linked to the issue of land reclamation or reclamation work by the Singapore government, whether in the south or in the north, involving the Straits of Johor and the Straits of Tebrau, where I think the sea reclamation work will certainly create a new boundary. I want to get an explanation: is there not a new, up-to-date map of the actual boundary of the waters between Johor and Singapore? Likewise, regarding our victory at Pulau Sipadan recently, which I also think involves other nearby islands. I will also raise confusion if there is no new mapping resulting from that victory, which I am confident and believe the Indonesian Government will always be alert and sensitive to matters like this. I hope we do not become like North Korea and South Korea, yes. Today it has begun, each side bringing out its advanced weapons. Finally, I also want to get an explanation about Item 04000 - Minerals and Geosciences. Our country is rich in these mineral resources, but I have yet to find a Malaysian brand. If the salt in the Dead Sea, or the Dead Sea in Jordan, produces various international products, especially in the cosmetics field. Salt and its products that are created. Our country's mineral resources are no less in quality. However, when we travel abroad, I have never found a mineral water. Here at the pharmacies and at 7-Eleven, sometimes we buy a mineral water for as much as RM7.00, said to contain very high oxygen content. However, since independence, has our country, under one ministry now, produced any product abroad under a Malaysian brand that comes from our minerals or mineral water? So, I want an explanation so that it receives the attention of all of us. Thank you, Mr Chairman.

Tuan Salahuddin Haji AyubAMANAH · PHKubang KerianEN

Honourable Batang Sadong...

Mr Chairman (Datuk Ronald Kiandee)EN

Thank you, Mr Chairman.

Puan Hajah Nancy ShukriPBB · GPSBatang SadongEN

Mr Chairman, choose Batang, yes.

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

It's all right. For this afternoon, let the women have the chance first.

Puan Hajah Nancy ShukriPBB · GPSBatang SadongEN

Yes, that's right, Honourable Member.

Mr Chairman (Datuk Ronald Kiandee)EN

I want to refer to Item 140800 concerning Irrigation and Drainage (JPS). Here I want to highlight the rural areas, where many still need drainage for the flow of water. Apart from preventing floods, it also aims to preserve the environment so that it is clean and orderly. So, I want to ask the ministry: how much is the allocation for irrigation and drainage for the state of Sarawak for this year, 2011, so that we too can enjoy this need to help our areas that are frequently and repeatedly hit by floods? Next, Item 060200 - Environmental Education and Assessment. Mr Chairman, I have observed that Environmental Education and Assessment is, I think, a smart investment if we allocate our funds to provide education to NGOs. This is because I have found that if these NGOs are given education in conservation and assessment

Puan Hajah Nancy ShukriPBB · GPSBatang SadongEN

of the environment, then our country can save a lot of our allocation for managing conservation and environmental assessment. This is because NGO members are ordinary people, and they will indirectly practise it at home and in the places where they work or wherever they are involved. So, I hope the ministry will take note of this matter so that we can move towards a group that can truly benefit our country. Apart from that, I also want to refer to Item 140700, namely the Department of Wildlife and National Parks (PERHILITAN). Here I want to request the ministry to study the wildlife laws so that the penalties for wildlife smuggling offences can be further tightened. I think the latest case involving Anson Wong, where he was only jailed for six months and fined RM190,000 for illegal snake export with a permit, is, I think, a very light punishment for a case like this. So, I hope the ministry will look at this matter seriously and give priority to amending the law on this matter. Next is Item 09800 – Sarawak Forestry and Botany Research Centre. I want to know from the ministry what kind of research is being carried out by the research centre in Sarawak and what the ministry's plans are to strengthen the discovery of natural resources in Sarawak? This is because Sarawak has many natural resources that we may not yet have explored, Mr Chairman. So, I want to know whether we can use this opportunity to promote them in the state of Sarawak. Finally, Item 16700, namely the Flood Mitigation Plan (RTB) and Urban Drainage. Mr Chairman, we all realise that this world is getting older day by day, just like us, as a result of global warming and also climate change, with permission. The challenges we face are getting higher and more difficult to overcome. So, areas exposed like my constituency, Mr Chairman, are exposed to Benak… with permission. So, my question is: how much is the allocation for this Flood Mitigation programme so that we can plan, since it is already in the plan and also in the proposal we have submitted to overcome or minimise the flood problems we face, because the erosion in the area is so severe. So, I want to know whether our plan or proposal has been included in the upcoming plan so that we can explain to the people of the area, because too many people are asking what our situation is. We are afraid we will be said to be one of the areas that is 'the sinking town'. So, I hope the ministry will help in overcoming this problem so that we can together plan how to control this flood. So, with that, I thank you, Mr Chairman.

Puan Hajah Nancy ShukriPBB · GPSBatang SadongEN

Honourable Bakri.

Mr Chairman (Datuk Ronald Kiandee)EN

Mr Chairman, I would like to touch on Item 060000 relating to the Results of the Environmental Quality Study at the New Rubbish Disposal Site in Pagoh. The statement by the Honourable Menteri Besar of Johor that the Bukit Bakri rubbish disposal site will be closed in stages starting in June 2010. It will be fully closed in 2011 and replaced with a new rubbish disposal site in Pagoh.

Tuan Er Teck HwaDAP · PRBakriEN

Then, the Councillor of MPM stated that the closure of the Bukit Bakri rubbish disposal site in stages can only be carried out in November 2010. This is because the results of the environmental study at the new rubbish disposal site in Pagoh have not yet been obtained. Furthermore, there is a statement by the PBT that as long as the results of the environmental quality study of the new rubbish disposal site have not been obtained, the old rubbish disposal site will only be closed by half.

Tuan Er Teck HwaDAP · PRBakriEN

Can the Honourable Minister give an explanation that the delay in the results of the environmental quality study at the new rubbish disposal site in Pagoh has slowed the timetable for closing the old rubbish disposal site at Bukit Bakri, as stated by the PBT Muar? Thank you.

Tuan Er Teck HwaDAP · PRBakriEN

Honourable Kinabatangan.

Mr Chairman (Datuk Ronald Kiandee)EN

Thank you, Mr Chairman. I need just a short moment, only a little. Thank you, Mr Chairman. I only want to touch on several items, namely in relation to the ministry's plans for flood prevention in the Kinabatangan area. I want to know how much allocation has actually been provided, because we know that this month, up until January, are the months of the northeast monsoon. The rain does not stop. So, if there is, I want to know how much allocation is provided for the Kinabatangan flood mitigation. Secondly, I also want to know whether the ministry intends to deepen the river mouth at Kampung Tanjung Aru. This is because I have asked for this allocation to deepen the river mouth, since when the water is very low at low tide, the fishing boats cannot enter or leave, and this affects their economic activities. So I ask the ministry to give attention and provide a special allocation for this request, because it affects the village community of about 700 houses and some 6,000 residents there, who are affected because when the river mouth is at low tide their boats cannot pass, as the land is overflowing. So I ask the ministry to give me the appropriate attention on this matter. Thank you, Mr Chairman.

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

Honourable Pokok Sena.

Mr Chairman (Datuk Ronald Kiandee)EN

Thank you, Mr Chairman. I want to touch on B.23 130400 – Environment and also 130600 – Irrigation and Drainage. This relates to the issue of floods in Kedah, particularly in my constituency and the surrounding areas. I want to get an explanation from the ministry on the question of irrigation and drainage: to what extent is monitoring carried out on projects implemented by other parties, particularly by other ministries, to ensure that the irrigation and drainage system is provided as well as possible and in accordance with the requirements set by JPS itself. This is because I see that several projects, particularly the project relating to the Durian Burung highway, took place before the recent flood, when a flood occurred in the Kampung Kejai area in my constituency, on the border with

Dato' Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Thank you, Mr Chairman. I wish to touch on B.23 130400 – Environment and also 130600 – Irrigation and Drainage. This relates to the issue of flooding in Kedah, particularly in my area and the surrounding areas. I would like an explanation from the ministry on the matter of irrigation and drainage: to what extent is monitoring carried out on projects implemented by other parties, particularly by other ministries, to ensure that the irrigation and drainage system is provided as well as possible and in accordance with the requirements set by the Department of Irrigation and Drainage (JPS) itself. This is because I see that several projects, particularly those relating to the Durian Burung highway, were carried out before the recent flood, when a flood occurred in the Kampung Kejai area in my constituency, bordering with

Dato' Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Padang Terap. They have never been flooded, but as a result of heavy rain for two consecutive days within a period of three months, they have been flooded three times in that area. So when I went to visit and check, and I reported to the JKR (Public Works Department) itself, especially to the Minister, it was finally found that it was caused by the drainage, namely the culvert, which was not built wide enough. That made the flow of water unable to run as well as it did before the construction project of the Durian Burung Highway. Once it was identified and modified, and a wider culvert was added, the area no longer experienced flooding, but this year alone they have been flooded with water three times, suffering damage, losses and so on. So I want to ask the Honourable Minister: how does your ministry, especially the JPS (Drainage and Irrigation Department), monitor the projects carried out by other ministries, including the JKR and also the Ministry of Transport in the implementation of the double track (landasan berkembar) for the Malayan Railway (KTM), because of the recent floods that occurred in areas close to the double track around Alor Setar in the Parliamentary constituency of Pokok Sena, where they have lived for almost 40 years in a residential area. They have never been flooded. The flood of 2005 was a big flood, but they were never flooded there, whereas this time they were flooded because I went to visit, I went down to the ground. I went down to the ground, I went through the flooded areas. Some people did not even go, they went to their evacuation centres and just made noise. They complained about this and that, saying that people did not help and so on. I went down myself. [House in uproar] I went down myself and saw that indeed their area is located very close to the double track area, and I found that the drainage was far too small, and when the residents there took the initiative themselves to dig out and modify the culvert, only then did the water recede quickly. But after that, the contractor who built the double track went and buried it again. So this problem that occurred shows that I do not see any monitoring done by the JPS to ensure that every project must comply with the condition of providing reasonable drainage space so that they can avoid flooding. In addition, such areas also face the problem of vibration after this, because the temporary track is too close to their houses. Vibration that can cause cracks, which is why I say that the residential areas nearby are very affected by projects that are not supervised properly, especially by the JPS, to ensure this matter of drainage. Finally, I want to ask about P.13900 – Flood Warning and Control System Programme. I do not know what has been done to ensure that immediate warnings can be given to residents, for example in areas like those I mentioned, where they were so panicked in the end because there was no warning, and suddenly the water rose into their houses. There were elderly people who could not be rescued in time, children and so on. So I ask what has been done in the state of Kedah in particular. Likewise, regarding flood mitigation in the state of Kedah, how many flood mitigation projects have been carried out in the state of Kedah? Finally, there is 15300 – Dredging of River Mouths. I want to know about dredging river mouths and deepening rivers. In my area, I was informed that among the causes of the flooding is that

Dato' Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

the river from Padang Terap to Bukit Pinang and all the way to Jitra can no longer accommodate its width and depth, and it needs to be dredged, whether widened or especially deepened. So I want to ask when these projects can be implemented, and what is most important, I want to know to what extent the government will monitor the contractors who are given the projects to deepen this river, to ensure that they dredge to the internal dimensions that are really needed. What mechanism is there? Because I have been observing that all this time, there are contractors who get projects to dredge rivers, deepen rivers or deepen drains and so on, but they dredge without reaching the level that is required. Not reaching the level that is required. So I do not know whether the department or the ministry of the Honourable Minister carries out monitoring, because I see that with the modern technology available today, if we use the system, especially the JPS system for example, we can conduct an audit to ensure how much soil has been removed, and we will find that the contractor is indeed doing the work properly. So I ask the Honourable Minister for an explanation.

Mr Chairman (Datuk Ronald Kiandee)EN

The Honourable Member for Putatan.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Thank you, Mr Chairman. This ministry is indeed the one of interest. First of all, I would like to touch on the matter that the allocation given to this ministry has fallen by more than half compared with the budget allocation last year. So I do not know what the reason is, because what we see in the details of P.23 here, the allocation for JUPEM (Department of Survey and Mapping Malaysia), Mr Chairman, is only RM15 million with three items, namely 02801, 02804 and 02806.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Three items under JUPEM, a department that is most important to me. Because it determines the direction of our country as a developed nation and one that will become a high-income nation. So when we plan any kind of planning throughout our country, we need information, we need correct information. We have such sophisticated technology, but unfortunately, for the project of boundary demarcation, measurement and maintenance of international boundaries, there is only RM4.5 million. We are experiencing problems with international boundaries, our maritime boundaries, which have been tested by several of our neighbouring countries, including Singapore, Indonesia and so on. We have not even touched on the issue of our boundary with the Philippines. So, when we raise the question of our international maritime boundaries, the answer that is always given is that it depends on diplomatic relations between neighbouring countries and our country, that is the only answer we always hear. So I hope once and for all, with respect, that our maritime boundaries must be resolved. We do not want our officers to keep arresting fishermen from neighbouring countries who enter our country. We must know where our boundaries are, and our neighbouring countries must know where the agreed boundaries are. So we do not want next time for our islands to be taken by others too. So, I hope especially for our boundaries, the maritime boundary between Malaysia and the Philippines. We emphasise this, and I hope this ministry can give emphasis

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

to this maritime boundary matter, and this matter must be looked at by the Ministry of Finance. Mr Chairman, regarding e-Kadaster, I think the state of Penang has already implemented it. Unfortunately, for the states of Sabah and Sarawak, it has not even started yet. Land matters are indeed important for our country's economy. If it is not about land planning, information that refines land transactions in our country. If we want to plan any land, we have to spend several days to obtain information. We have technology, we have ICT, but unfortunately we cannot get that information through what we have in our information system. We have to go to government offices to obtain information. Why can Google obtain it directly? Why is it that our country, which should be easy, we already have technology, we already have information held within our departments. Why can we not provide this information to the public, with respect. The same goes for the enhancement of the local area network and wide area network, LAN and WAN. This has not yet been strengthened, only RM1.5 million has been allocated. That is not enough! We say we are a developed nation, but this is just playing around. So this is very important for our planning, Mr Chairman. But it has already been approved, yet what I see here is that the allocation is insufficient. It seems that this is just not right, not right. So I turn to Item 10804 – Heart of Borneo (HOB) Project, Sabah State, with an allocation of only RM2 million. This is a major plan proposed by the Sabah State Government, and it needs assistance from the federal government, because this is a good effort to promote these two states, Sabah and Sarawak. What can RM2 million do? Perhaps it can only cut timber and clear the area. What can we do with RM2 million? The cost of determining the location is already very high, what can RM2 million do? So when we look at the allocation given to Karambunai, eco-nature tourism, with RM3 billion. This is an area where we can enhance the image of our country, that we show, that we portray that we preserve nature in Borneo or in Malaysia to countries that wish to visit our country. So an allocation of RM2 million is indeed not enough. I hope the ministry can review it, because the allocation is only enough for the cost of setting up the place itself. Clearing has not been included, identification has not yet been known. So what is this? So I hope that with such a small allocation we cannot expect much from what is in this budget. Mr Chairman, what is most important is Item 15200 – Improving, Beautifying, Cleaning and Treating River Water and Infrastructure (MASMA), which is allocated only RM52 million. I want to know from the ministry, how many rivers have been cleaned? How many have been preserved throughout our country? If the Honourable Member for Pokok Sena says there is a project carried out by a contractor, I do not know which river, but in Sabah I do not know whether there are any rivers that have been done. In my own area I obtained an allocation of RM200,000 to clear the area of just one village. That is indeed not enough, and I think that allocation came from the Ministry of Agriculture and Agro-based Industry, and included the Ministry of Rural and Regional Development and so on. When we look at what is happening, we have applied for a master plan, namely flood mitigation for the Putatan area. Unfortunately, in the Eighth Malaysia Plan we had put it forward, in the Ninth Malaysia Plan we

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

put it forward, but unfortunately, in the Tenth Malaysia Plan and the Eleventh Malaysia Plan this may not be implemented because there is no allocation specifically given for the same purpose. So when we look at a briefing held in the city of Kota Kinabalu, flood mitigation throughout the Kota Kinabalu and Putatan areas, we have seen it with a very high amount, involving all rivers being built with concrete. That is not the way. We protect the environment, Honourable Minister, our environment is not what we make with concrete. Because if we build with concrete, what about the aquatic species in those rivers? We are actually destroying the environment. If that is the case with the minds of the consultants. Everything focuses on the number of projects, how many projects will be implemented, that is not what I mean. What we want are clean rivers, orderly rivers, no flooding, and flood mitigation carried out with good design. Do not have many tidal gates that cause flash floods because they are clogged with rubbish there. Flood mitigation, tidal gates are only small, when the rain is heavy?

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

What the Honourable Member for Pokok Sena said is correct, the culverts are small. When contractors clean the grass on the riverbanks, the grass and rubbish all go into the river, and this causes blockage.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Member, I apologise, Honourable Member, your 10 minutes are up.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

May I ask for one or two more minutes, the last point. So I hope the ministry can look at this, in cooperation with the local authorities (PBT) and so on, so that our rivers are not clogged. Mr Chairman, Item 15300 – Dredging of River Mouths. Likewise, contractors who are identified. When dredging these river mouths, what is dredged is simply dumped aside. When the tide comes in, the soil that was dredged flows back into the river. So this is useless, it wastes the people's money, it has no use. Two or three months later, the problem still persists, fishing boats cannot enter the river mouths. So I hope that the monitoring of these contractors must be monitored. That is all, Mr Chairman. I do accept, I am a disciplined person. If Mr Chairman tells me to stop, I will stop. Thank you.

Mr Chairman (Datuk Ronald Kiandee)EN

Sometimes, Honourable Member, you don't stop either, today only you stopped. [Laughter]

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

The Honourable Member for Indera Mahkota.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Thank you, Mr Chairman. The first thing I want to mention under Supply Purpose 23, namely Item 090000 – Marine Parks. I am not sure, and at the same time I want to ask the ministry, has the ministry already administered and established an Act to protect our marine parks as a proposal? I do not remember, and from the checks I made, I did not find any law to control and administer our marine parks

Tuan Azan IsmailPKR · PRIndera MahkotaEN

as I found a proposal to implement the National Marine Park Protection Act, I am not sure. I request an explanation. If there is, what are the functions of the departments assigned to administer it? If there is not, I think we need to study the possibility, taking into account several recent incidents that occurred this year, especially those that drew much attention. Half of the world's society has observed that a racial riot almost broke out in the Gulf of Mexico due to an oil spill from a ship in those waters, which eventually blamed some of the residents living along the coast of the Gulf of Mexico, where the Government of the United States had to intervene to provide explanations and end this dispute. This matter could also arise, and there is no good solution. So far, several cases of oil spills have destroyed much marine life, which in turn will damage coral reef resources and so on, which should be under management for the protection of marine life or the national marine park, which we acknowledge today as an important treasure and one of the few remaining in the world in our country. Under Supply Purpose Development, I want to ask the ministry about Item 2301, namely the e-Tanah project. Mr Chairman, e-Tanah has been presented, mentioned and debated for several years. I want to raise the matter of e-Tanah because in the previous debate, the Minister in the Prime Minister's Department in charge of Islamic affairs raised an issue regarding wakaf land, which was said to be worth almost RM42 billion in its current condition, and is expected to increase to a much higher amount when revaluation of property value takes place throughout the country. The field of information management regarding these wakaf lands will not become complete and will not be perfect at all if it is not supported by electronic information that should have been properly developed under the e-Tanah project. I want to know, what is the current position or status of this e-Tanah project? While the answer is being given later, I hope we may be allowed to interject to present some information and recent incidents regarding the e-Tanah project which have caused chaos in land information management. This is also supported by several issues or reports at state level where there has been confusion in providing up-to-date information on land ownership. Mr Chairman, I also want to touch briefly on PERHILITAN (Department of Wildlife and National Parks). I want to ask the ministry specifically, is it true that the overall estimated project under the PERHILITAN management that we have named totals only RM800 million for five years? I want certainty on that for now. That is, whether it is correct or not. I do not intend to present evidence at this time, because the PERHILITAN topic is one that in my view needs to be explained first before we put forward anything reasonable later. Finally, I want to touch on the Flood Mitigation Plan (RTB) under Item 16700. I want to ask the ministry about a report that was presented, including on the ministry's website, which states that the total budget for this flood mitigation project is worth RM11.3 billion. This year alone, expenditure of nearly RM1 billion is proposed, and it is stated here, directly, that this expenditure requires an additional RM1.166 billion

Tuan Azan IsmailPKR · PRIndera MahkotaEN

and bringing the total spent on this flood mitigation project to RM5.16 billion. However, looking at the situation or the event that traditionally occurs every year, this year it is the turn of Kedah and Perlis in the north to receive the consequences of this natural disaster. I want to know the justification for spending nearly RM6 billion, the product of which is floods every year – we doubt, fail, with permission, and take turns. One time the south, sometimes the north, sometimes the east, and before long it will be the area where I am, in Pahang, and we are preparing to face this situation. But before that, I want to know, is it true as reported that the total expenditure or planned expenditure for this flood mitigation project is RM11 billion, and that what has been allocated and spent so far is nearly RM6 billion? Thank you, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Pasir Salak. You have ten minutes, Honourable Member.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Thank you. It will be brief, Mr Chairman. I want to refer to the beautification of rivers under Item 15200, namely referring to the Perak River. I am from Perak and my constituency, Pasir Salak, is also Kampung Gajah. In my observation, if a good plan is made for this Perak River, it will bring various benefits. Firstly, it will overcome the flood problem. Secondly, the land on the riverbanks can be developed into beautiful and cheerful settlements and provide opportunities for residents to obtain areas to build settlements or houses that are very much needed at that time.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

So I would like to propose to the ministry that it carry out planning through a coordinated effort, with permission, with other ministries that are related to settlement and related to housing. This ministry cannot move separately if it wants to develop river areas, because there is overlap between one another. I believe that if several ministries or agencies related to this matter combine, sufficient allocations or large allocations may be obtained to be utilised or used to make this project a success.

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Member, Honourable Lenggong, stand up.

Yang Berhormat...

‘Lenggong’ boleh.

Thank you, Mr Chairman. I was interested in the Honourable Pasir Salak mentioning the Perak River just now. In fact, even if I had the chance to speak, I would have wanted to touch on this matter. But it is a little different because in my constituency, among the causes of floods is that the level of the Sungai

Perak has already become higher than ordinary rivers, which causes the flow of water to be unable to exit into the Perak River. Therefore, whether or not the Honourable Pasir Salak agrees, if we ask that the ministry not only conduct a study but also expedite a project to deepen the Perak River. Along with deepening it and making embankments to beautify it for the settlements just now. That means two in one or three in one. We solve the people's problems and we make it an attractive tourist area because this matter is urgently needed. Whatever we do – dredging rivers, river deepening – usually cannot solve the flood problem because the Perak River itself cannot have its water flow into the Perak River. Thank you, Honourable Pasir Salak.

Dato' Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Thank you, Honourable Lenggong. I cannot say I agree because only the Minister can agree. I am not a Minister. [Laughter] But I can give views, I can support. Agree, I have no more power. [Laughter]

Style like the Minister just now. Because the way of listening is like a Minister.

Dato' Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Mr Chairman, apart from that, the benefit of this river can also be used as an alternative communication – an alternative link from the road. In the past we also used the river to travel here and there using boats, using sampans and so on. But let us not belittle the system of using this transport. It can be restored if implemented in a modern way and using new technology. In Melaka too we see the Melaka River. The Melaka River used to be dirty, nobody came. But today the Melaka River has become clean and is used by tourists from around the world who come to Melaka. So, this is an example where the government can develop a river and the economic and social benefits to the community and to the people as a whole. Another thing, Mr Chairman, is regarding drainage. I find there is overlap between the local government and this ministry regarding, for example, the position of maintaining the drains that function as drainage for places or areas concerned, including in small towns and so on. I find the drains today are very repulsive, very dirty and smell foul. Not only do they damage the environment and affect the scenery and also our feelings. When in such a condition, we look at it and we experience its not very pleasant smell. We also find many restaurants and stalls where we eat food with an unpleasant smell. So, there are drains and drainage channels that for dozens of years cannot be cleaned. I am also surprised why it has become like this? The drains have been clogged for years and years and nobody seems to care, with permission, whether it is local government, or local council or maybe also the ministry. If they function and are responsible for the drainage, why can such a thing happen? We are ashamed in front of tourists, we are ashamed of ourselves too. It seems as if the people of Malaysia are dirty. Are the people of Malaysia dirty? A people who already have a knowledgeable, knowledgeable, highly cultured society. But we find our environmental condition like this, as if we are in a third-world country. Zimbabwe is a third country. The actual fact is we are already coming to a first country, a developed country. I pity seeing a condition like this.

Dato' Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Why do the leaders who steer all this work not see it? Do they not notice in appointing their members, heads of department – let them be people who know about cleanliness. Who like cleanliness. If the head of department is also dirty, how can he clean the area in his place? The same goes for the Council Presidents – deviate a little from this ministry. The Council President, who sits in that area every day, does he not see it? Or does he really like such a condition? I feel sad and sometimes want to invite everyone to do gotong-royong every week. But we, as Members of Parliament, are so busy, how can we do it? [Laughter] True. Another thing, regarding the paddy field areas. This is the last one, the final one. Mr Chairman, drainage – it is also under the JPS in the paddy field areas, agriculture and so on. Likewise, the overgrown bushes that were formerly drainage ditches that became the source of drainage have silted up and water can no longer flow. So how did it happen? With permission, do not tell me it takes hundreds or millions of money to clean drains like these. I see on the sides of these ditches and drains, overgrown bushes. Whether the grass is cut after it has grown taller than a person. This is happening! Why is it happening like this? The reason is that the people assigned the task of cutting this grass are paid very low. RM3, RM5, who wants to do this RM3, RM5 work for one day? Pay a good, reasonable wage, and many will certainly want to do cleaning work in this area. Only then will the paddy field area be beautiful. If it is beautiful, many tourists will also want to come and the people can also live in a cheerful, prosperous condition. I ask the ministry not only for money, allocations, budget and so on, but also in terms of our commitment to the environment, to river cleanliness, to overall development. That is all. I support, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Kota Raja.

Thank you, Mr Chairman. I would like to bring up Item 060300 – Monitoring and Enforcement under the heading Environment. I would like to ask the ministry about the parties responsible for approving highland development. To my knowledge, development of highland 3,000 feet and above requires approval from the Highland Development Committee at the JPM and also EIA approval, and for those below 3,000 feet in altitude and below 500 acres, approval is also from the Department of Environment. The gap is development below 500 acres and below 3,000 feet in height. So, for developments in areas like this, who monitors and enforces environmental protection and compliance with the highland development guidelines. I think with no efficient monitoring and enforcement from the Department of Environment, developments, especially for agriculture in the highlands, are very sad. Perhaps the Honourable Members who on the way to Galas recently passed through the Lojing Highlands area, and we saw how highland development for vegetable cultivation is very disheartening. In fact I see the level of river pollution is so severe because the water has turned like milky tea.

The main point is I do not want this matter to be politicised or to take the opportunity to point fingers at the Kelantan State Government, because the Kelantan State Government has the Lojing Highlands Committee with its approval, and its committee members consist of representatives from all the ministries involved and the departments involved. The problem is a problem of enforcement and monitoring. So, how and what has the Department of Environment done? How many companies or how many developers have been charged under offences involving environmental pollution? This is because we do not want to see such a beautiful area. I am not anti-development. We need to develop the highlands but we need to develop them in a way that does not pollute the environment. So, we hope that the Department of Environment, which in fact has the power, has the authority to monitor and enforce, not the state government. So, what steps has the Department of Environment taken to enforce or charge developers or companies or planters who have violated the guidelines set by the DOE itself. So, how many companies have been charged? I want to know, so far how many of these developers or plantation companies have not submitted EIA reports? What enforcement and monitoring problems have occurred in the Lojing Highlands? I want to mention that not only the Lojing Highlands have problems, in Cameron Highlands this matter has long been raised to the point that the air or weather in Cameron Highlands is no longer as cool as before. Recently we also saw how logging that is said to have occurred at the upper Rajang River covered an area as large as Singapore. How can these matters happen outside without action by the Department of Environment. Mr Chairman, I would also like to bring up 060200 regarding Environmental Education and Assessment. I feel that environmental education this...

Datuk Billy Abit JooPRS · BNHulu Rajang

Tuan Pengerusi.

Is not adequate and not sufficient.

Datuk Billy Abit JooPRS · BNHulu RajangEN

I want to ask, a little clarification.

Mr Chairman (Datuk Ronald Kiandee)EN

Want to give way, Honourable Member?

I apologise.

Datuk Billy Abit JooPRS · BNHulu Rajang

Hulu Rajang.

Oh! [Laughter] Can Hulu Rajang bring it later? I have several points. Sorry.

Datuk Billy Abit JooPRS · BNHulu RajangEN

There is a little correction.

Datuk Billy Abit JooPRS · BNHulu Rajang

The biomass clearing in Bakun is actually 500 hectares (15 kilometer radius) sahaja. The catchments area is the size of Singapore. Bukan seperti yang disebut dalam The Star itu hari. That was wrong, okay.

Thank you, Honourable Hulu Rajang. Anyway, if it results in logs stranded for kilometres in the Rajang River, that is also a matter that remains a question to the people of Malaysia.

I continue. Environmental education and assessment – what are our efforts to systematically include environmental education in our education system. We can talk about life skills and so on, but environmental education now, perhaps as also discussed, is said to be productive health education or sex education, which has become so important because it causes our country's environment perhaps not yet to have reached a critical level but it will reach that level. So, what is the cooperation between the Ministry of Natural Resources and Environment and the Ministry of Education in formalising, with permission, formalising environmental education in our education system. We cannot just rely on NGOs alone to carry out environmental education. If we wait, one day it may become too late and our children and grandchildren – if we now inherit rivers the colour of milky tea or cappuccino, perhaps our children will inherit a river that is not only like thick black coffee, but also will smell like, as Kedahans say, like acak. Do you know acak? That is household sewage in villages that does not enter the drains, like the drains mentioned by the Honourable Member from Pasir Salak just now. So, we do not want it to reach that level. I think there is much we can do in environmental education and I do not need to detail or elaborate here because that one topic alone can take an hour or two hours. So, it must be included in the formal education system. Finally, Mr Chairman, Development Purpose 23, Item 16700 – Urban Flood Mitigation and Drainage Plan. I represent the Klang district and this Klang area is not only lower than sea level, but because of its rapid development, causes old areas that have been developed to be prone to flooding even when rain is not heavy and rain falls over a short period. When new development areas develop, new areas or new housing estates, new developments follow the plans or conditions that have been set by their respective local authorities. However, with the expansion of this development area, we find that the drainage is insufficient because the drains of new housing areas still connect to old drainage channels. There is no increase in large drainage channels or drains and when heavy rain falls, naturally the low-lying areas and old villages are flooded and the people bear enormous losses. So, I think we have applied for our area to have a new drainage system and I would like to ask, whether this allocation includes a drainage system for the Klang district. Thank you, Mr Chairman.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

Wah, there are many. I give way to the Honourable Parit Sulong.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman, for giving me the opportunity. There are only two matters. So, if there is much more time later, perhaps it can be given to the Barisan Nasional Member of Parliament here. [Laughter]

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

The first one, Development Purpose 23, Item 15300 – Dredging of River Mouths. So, I would like to request the ministry to

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

...provide a list of river mouth dredging projects in the Parit Sulong area for 2011. I also want to know the effects of these river mouth dredging projects, especially on the Sungai Batu Pahat, Sungai Simpang Kiri and Sungai Simpang Kanan, on solving the flood problem, especially the flash flood issue and the Temenung flood incidents in the Parit Sulong area, particularly in the DUN Sri Medan. I also want to request an explanation of how we can guarantee or ensure that the river mouths that have been dredged do not become shallow again in a short time? Next, on Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. I also want to refer again to the problem of flash floods in the Parit Sulong area. For the information of Mr Chairman, the flood problem in Parit Sulong often occurs in my area. This year alone there have been two flash floods around the Parit Sulong Parliamentary constituency, particularly in several villages such as Kampung Parit Kuda, Kampung Air Putih, Kampung Sejagong up to Sungai Kepoh, which caused these areas to be completely cut off for several hours because the roads could not be passed. I understand that these flash floods do not have as great an impact compared with other floods. However, flash floods in my area should be given proper attention, considering that these flash floods are quite frequent. They occur mainly due to the unpredictable weather now and also because of the topographical factors of the area itself, which is low-lying and easily holds water when flooding occurs. I observe that these flash floods are getting worse, especially when floods occur at times when the sea or river water is at high tide. This condition causes the flood water to be unable to flow out more quickly into the sea. Among the causes I have identified, which may be given attention by the ministry, is what was also raised earlier by many of my fellow Members of Parliament. Among the causes we observe that worsen flash floods especially are clogged drains and gutters. Although my constituency Parit Sulong certainly has many drains, Mr Chairman. However, I observe that these drains are clogged not because of rubbish but because much grass is not cut, not maintained, or not cleaned properly. Perhaps because of financial constraints. Therefore, I want to know how much the budget is for upgrading and also maintaining this drainage system for 2011, for my Parliamentary constituency? I also want to know how much budget has been allocated to tackle the flash flood issue in this area, and I hope it will receive immediate attention. I also would like to propose to the ministry that this allocation be increased, not only to reduce the flash flood problem in my area but also across the whole country. Thank you very much.

Mr Chairman (Datuk Ronald Kiandee)EN

Yes, we give women another turn. The Honourable Member for Tawau. [Laughter]

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

Talking among themselves.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

If it's like this, we might as well change clothes. [House in uproar]

Datuk Chua Soon BuiSAPP · BNTawau

Terima kasih.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Mr Chairman, we'll change clothes after this.

Mr Chairman (Datuk Ronald Kiandee)EN

We give women a turn, and then it's noisy.

Datuk Chua Soon BuiSAPP · BNTawauEN

Thank you, I convey my thanks to Mr Chairman.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

They're all the same.

Datuk Chua Soon BuiSAPP · BNTawauEN

To show respect for the women in this august House. I will refer to Purpose B. 23, Item 060000. I would like to congratulate and commend the ministry on its credibility in rejecting the DEIA report, which lacked credibility, for the proposed coal-fired power plant at Kampung Sinakut, Felda Sahabat and Lahad Datu. That was a wise decision and I would like to know how much the DEIA report cost and who paid for that cost? What is the ministry's action plan regarding the rejection of the proposal to build the coal-fired power plant, because the ministry and the government have received strong objections from the public, particularly the NGO Alam Sekitar Sabah and individuals such as Encik Wong Tack, Puan Cynthia Ong and their committee members? What is the recommendation on the proposed coal-fired power plant to the Ministry of Energy, Green Technology and Water? Secondly, I would like to know the functions and effectiveness of the enzymes used in mud balls to clean and upgrade the water quality in ponds, rivers, seas and so on. Does the ministry plan to encourage such actions or ways to upgrade water quality? I also refer to P. 23, Item 140800. Mr Chairman, the people of Tawau continue to suffer because of the flood situation in both areas of Sin Onn and Apas, covering at least 30,000 residential houses, which has become worse in recent months with two very serious floods. It is really unacceptable when these residential houses are flooded, even though the proposal by the Drainage and Irrigation Department (JPS) regarding widening and changing the flow direction of the Sungai Tawau has been submitted many times before. This has become an alarming matter in Tawau, and more residential houses will be affected if the Sungai Tawau widening plan is not implemented as quickly as possible. I would like to know whether the ministry has received project proposals from JPS Tawau or JPS Sabah that are essential for the people of Tawau? Why has that project not been given priority? What is the reason the project has not been implemented? If the government is serious about the 1Malaysia concept, People First, Performance Now, it should fulfil all its promises to the people of Tawau. The people are sad, disappointed and angry. What will the government do regarding the alarming problem in Tawau? With that, thank you.

Mr Chairman (Datuk Ronald Kiandee)EN

The Honourable Member for Gelang Patah.

Dato' Samsul Anuar NasarahUMNO · BNLenggongEN

Women again. [Laughter] [House in uproar]

Puan Tan Ah EngMCA · BNGelang PatahEN

Thank you, Mr Chairman.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Okay, we change skirts. The Honourable Member for Tenom, we change skirts.

Tuan Pengerusi.

Puan Tan Ah EngMCA · BNGelang PatahEN

Mr Chairman, I have one matter regarding Item 060300 – Monitoring and Enforcement. One matter I want to raise concerns the monitoring of river pollution in my area. Last week, 200 families of residents of the Kampung Nelayan Sungai Melayu Gelang Patah came to meet me to raise the problems they are facing. For the information of Mr Chairman, a Coastal Highway construction project has begun, involving two areas, namely the Gelang Patah and Pulai Parliamentary constituencies. During my visit with the residents, it was found that the negligence of the main contractor, Kota Selat Tebrau Sdn. Bhd., has caused reduced fish catches and affected the livelihoods of the fishermen.

Puan Tan Ah EngMCA · BNGelang PatahEN

The development project has also caused river pollution because of the mud that is spreading more widely at the river mouth. In addition, I also received a complaint from residents that the developer of Taman Amira is also one of the causes of river pollution because it is discharging sewage into the river. Therefore, I humbly ask the Honourable Minister to take action and carry out an investigation into the case and provide assistance to the affected fishermen. Thank you.

Mr Chairman (Datuk Ronald Kiandee)EN

The Honourable Member for Bukit Katil.

Datuk Md. Sirat AbuUMNO · BNBukit KatilEN

Thank you, Mr Chairman.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

That's because of the glare. [Laughter]

Dato' Shamsul Anuar NasarahUMNO · BNLenggongEN

Melaka is not flooded.

Datuk Md. Sirat AbuUMNO · BNBukit KatilEN

I refer to Item 16700 - Flood Mitigation Plan (RTB) and Urban Drainage. This covers most of my Parliamentary constituency of Bukit Katil and part of it is within the Kota Melaka area. Under the earlier flood mitigation plan in my area, the Federal Government agreed to allocate RM128 million to overcome the flash flood problem in the urban area. However, until today only RM50 million has been paid and we still face many flash flood problems, and I understand the balance of RM78 million has been withdrawn. So, this is rather regrettable, and it should be expedited so that the flash flood problem in this urban and tourist area does not affect tourism activities. So, if possible, I ask the JPS and UPU officers to come down to the ground. Do not only ask the people's representatives to come down to the ground, because before cancelling or withdrawing, come and look first. Do not wait until tomorrow when there is a major flood like in Kedah and then hundreds of millions more are needed before the RM78 million is released again. So we think RM78 million is not much

Datuk Md. Sirat AbuUMNO · BNBukit KatilEN

anymore. If possible, it should be expedited so that the flash flood problem in this area can be overcome quickly and the tourism development programme in the state of Melaka can be continued properly. Thank you.

Mr Chairman (Datuk Ronald Kiandee)EN

The Honourable Member for Hulu Langat.

Dr. Che Rosli Che MatPAS · PRHulu LangatEN

Thank you, Mr Chairman. Referring to P.23 Item 020300 - Land Coordination and Operations valued at RM139.7 million. Previously I was given to understand that land matters are only under the respective state governments, but alhamdulillah the government has allocated RM139.7 million. How is this to be distributed to the land offices and districts of each state? I request an explanation for that. Secondly, referring to Item 020400 - Special Task Force allocated RM27.5 million. So what is the nature of the duties and responsibilities of this task force? Is it to monitor and expedite the settlement of land ownership or only to ensure that the government's land acquisition runs smoothly? Referring to Item 040400 - Mineral Research. I am interested to know the potential of new minerals in our country, for example white gold, uranium and so on, and what is the latest modern method used to determine the types of minerals in our earth. Referring to B.23, Item 80000 - Irrigation and Drainage valued at RM79.1 million, and Head P.23, Item 15200 To Beautify, Improve, Clean and Rehabilitate Rivers and Infrastructure (MASMA) valued at RM52.2 million, and Item 16700 - Flood Mitigation Plan (RTB) and Urban Drainage valued at RM1.16 billion. I want an explanation of how far the rivers included in the polluted category, for example the Juru, can be cleaned and the shallow ones deepened. What about the progress of flood mitigation for rivers that are always exposed to flood problems, as mentioned by the Honourable Member for Kota Melaka just now. So, I want an explanation of how the Hulu Langat river in my Parliamentary constituency is progressing. Referring to Head P.23, Item 80600 Sustainable Forest Management (JPSM) and Item 09400 - Infrastructure, Modification and Other Facilities (JPSM). What kind of work and programmes are being implemented in protecting the forests, especially gazetted forests and the habitats within them. For Item 09000 - Forest Plantation Development. Why is it allocated such a small amount, only RM210,000, when the explanation by the Honourable Deputy Minister in the policy speech earlier mentioned that there is allocation to be lent to entrepreneurs who wish to undertake forest plantations. So I want an explanation, thank you.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Members, I think it is enough, let us end the debate at 5 pm later. I invite the Honourable Member for Sri Gading.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Mr Chairman, I will summarise, Mr Chairman. First, P.23 Item 07100 - PERHILITAN, wildlife protection. This is about the long-tailed macaque monkeys in my villages, Mr Chairman. This is serious, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Yes, continue, Honourable Member.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Seriously, people in the villages can no longer farm, Mr Speaker, because of the disturbance from the monkeys, whose habitat and natural resources we have disturbed. This is true, these creatures are also God's creatures, Mr Chairman, these monkeys, their food sources are gone. Because of hunger, Mr Chairman, they fight. Even humans with reason, when their stomachs are empty because of hunger, can kill each other. This Mr Chairman also understands.

Mr Chairman (Datuk Ronald Kiandee)EN

Yes, I understand. The Honourable Member has an area in Sandakan where they feed the monkeys and then invite tourists to come, as a source of income.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

That is a clever group, but in my area there are no tourists who want to come and watch monkeys eating, Mr Chairman, none. [Laughter] So, these monkeys, because of hunger - humans with reason can also fight because of hunger, Mr Chairman, let alone monkeys who have no reason. They go to the villages, Mr Chairman, wherever there are banana trees they attack, wherever there are pineapple plants they attack, wherever there are rose apple trees they attack, wherever there are rambutan trees they attack. They are not evil, they want to fill their stomachs. We complain to PERHILITAN, is my pronunciation correct? My friends were talking about it, Mr Chairman, because I find it very hard to pronounce this word, Mr Chairman. PERHILITAN.

Tuan Haji Salleh KalbiUMNO · BNSilamEN

Silam, may I? Thank you, my friend the Honourable Member for Sri Gading, thank you Mr Chairman. I want to ask the opinion of the Honourable Member for Sri Gading on whether he agrees that the reason PERHILITAN is indeed rarely given attention by the ministry.

Tuan Haji Salleh KalbiUMNO · BNSilamEN

Does the Honourable Member agree that, since these monkeys can also contribute to a source of income, especially for rural communities, this department should introduce a suitable bill to perhaps train these monkeys so they are suitable and have potential, if any suitable co-curricular activities are introduced. [Laughter] So does the Honourable Member for Sri Gading agree? [Laughter]

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Well, what the Honourable Silam said, I refer to the Minister. [Laughter] You answer, Minister. [Laughter] So, let me ask, apart from being shot, captured, shot, captured, is there any other effort? Apart from being captured, shot, captured, shot, what other effort is there? Perhaps food is provided? Isolated in one place, food is given there. We must not be cruel to the creatures whose area we have encroached upon. They have nowhere to eat - Honourable Dato' Jeli, welcome back safely from performing the pilgrimage, a blessed hajj. This is important, this is also to earn merit, Dato'. I don't know what? If it's a matter of capture and kill, capture and kill, shoot, shoot, please don't. They are not troubling our...

Dato’ Lilah bin YasinUMNO · BNJempol

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Member Jempol, please stand, Honourable Member.

Dato’ Lilah bin YasinUMNO · BNJempolEN

Honourable Member for Sri Gading, may I say this. We don't shoot, but we propose setting traps for PERHILITAN department officers. The PERHILITAN officers too... [Laughter]

Capture the officers. [Laughter]

Dato’ Lilah bin YasinUMNO · BNJempolEN

Not capture the officers, capture these monkeys and baboons. We propose this, but the answer to us is that they have no allocation to set traps. Can the Honourable Member propose to the Honourable Minister to approve an allocation for traps and then add officers, because their workload has increased.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Thank you, Honourable Member Jempol. I also hand this over to the Honourable Minister. Yes, if this is one view, we are not oppressing God's creatures. They are already here, we capture and kill, capture and kill. Allah... I cannot manage, Mr Chairman. Then our officers are also very limited. Even PERHILITAN, that is one thing. The allocation here is actually not quite enough, as if we are not serious. Like, just for show. I am not accusing, but as if not very serious. If there is an elephant tomorrow, move the elephant. That is big news in the newspapers. If a tiger escapes, it becomes a big story. These are every day, that is one thing. Second, like Parit Sulong, earlier Parit Sulong already raised this. This is flood mitigation in Batu Pahat. Flood mitigation, if RM1.1 billion for the whole country - Batu Pahat alone for flood mitigation, which I understand needs RM1.9 billion. Yes, but if the whole country in 2011 has only RM1.1 billion, do not forget, these flood matters are matters of human life in Malaysia. For example, flash floods, sometimes not because the river has not been dredged, but because there are also matters related to JKR. JKR culverts do not allow water to flow to the other side, so there is a flash flood here. Is there any cooperation from this ministry with JKR? Later the question, like I take the example in my area last week, to dig that would cost RM20 million. JPS has no money, JKR says it has no allocation. This means the flash flood problem will recur every time it rains for three hours. I don't know how. So I hope matters like these, flash floods and also dredging river mouths. Indeed, the river mouth - river mouths are often buried. Indeed, they are often dredged, Mr Chairman. [Laughter] So that it can flow, Mr Chairman, they must be dredged often, Mr Chairman. But if the allocation... [Laughter] I don't mean anything by it, Mr Chairman, we are both clean, speaking straight.

Mr Chairman (Datuk Ronald Kiandee)

Ya.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

So, please add more to these allocations, Mr Chairman, it is not enough. So Mr Chairman, I will give a chance to my other friends. I support this ministry, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Yes. Thank you.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

There are too many from this ministry, BN Members stand up. Let us give BN a few more, Honourable Member, yes. I call the Honourable Member for Paya Besar.

Dato’ Abdul Manan IsmailUMNO · BNPaya BesarEN

Thank you, Mr Chairman. In ditches, marshes, rivers. [Laughter] Regarding P.23 Item 140800 -

Dato’ Abdul Manan IsmailUMNO · BNPaya BesarEN

Irrigation and Drainage. There are three villages in the Paya Besar area, particularly the State Assembly constituency of Pancing, that are frequently hit by floods: Kampung Pancing, Kampung Permatang Badak and Kampung Pandan. The issue raised, or what encourages floods to occur, is the measures that have not been maintained systematically. This is because I have observed that the Department of Irrigation and Drainage (JPS) takes two years to maintain the existing drains. I do not deny that the JPS is now maintaining the large drains, particularly from the Taman Tas area all the way to Kampung Sri Bulat. These large drains are currently under maintenance. However, what about the small drains that need to be maintained, because it is these drains that cause floods in the areas I mentioned earlier. If we review it, the cost of maintaining these drains is not equal to the cost the government incurs to finance flood victims. Item 16700 - Flood Mitigation and Urban Drainage Plan. I want to get certainty from the ministry on whether the flood mitigation works at Sungai Isap and also at Kampung Pandan have been fully completed. Because if both of these flood mitigation works are not completed, I believe that this year, when a major flood is forecast around Kuantan, many more villages will be affected by these floods. So, I have been informed that RM27 million has already been spent on the construction of flood mitigation at Sungai Isap and RM9 million at Kampung Pandan. I do not know whether they have been fully completed or are still under construction. Item 15300 - Dredging of River Mouths. I would like to draw the ministry's attention to Sungai Kuala Kenau, which is now shallow. This is because the sand in the river has become level with the riverbank. So, if it rains non-stop for four hours, the town of Sungai Lembing will flood. Once upon a time, I think in 2002 or 2003, the government appointed a contractor to dredge this river. However, since the contractor found that extracting ore was more profitable than dredging sand, they misused the contract that had been provided. Nevertheless, the government has already terminated this contract. In addition, I also ask the Department of Environment to monitor the logging activities in Sungai Lembing, because the logging debris carried away by the water of Sungai Kuala Kenau has caused all three bridges over the river to be severely damaged. Thank you, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Pendang.

Thank you, Mr Chairman. There are only three items that I will present this evening. Firstly, Item 130600 – Irrigation and Drainage (JPS). So, I want to ask the ministry because this matter has already been raised by me with the state government, but the state government said they had no knowledge regarding the Noak Dam in my area, namely in Pendang. In fact, the residents' land has already been surveyed, the land has been studied for land clearing, and tests have been conducted on the strength of the land, supposedly because a dam would be built in my area, referred to as the Noak Dam. This Noak Dam is the result of the Beris Dam

whose drainage will be channelled through the Noak Dam and joined to the Pendang district area. The state government has indeed wanted to obtain an explanation from the JPS, but perhaps until now the JPS has not yet submitted any details regarding this Noak Dam. In fact, the district office itself has not received certainty on whether it will be implemented or not, because there has been no discussion between the JPS and the District Office in Pendang. It must be understood that Kedah currently has no fewer than four dams, namely the Muda Dam, Pedu Dam, Ahning Dam and also the Beris Dam. So, with the existence of the Noak Dam, I think most areas in the state of Kedah will be filled with dams. Although we know it is one of the ways to increase water drainage to paddy fields. However, with so many dams there may be problems in the future, as had to be done at the Timah Tasoh Dam in the state of Perlis recently. So I hope the JPS can provide the clearest possible explanation regarding this Noak Dam. Likewise, I would like to know what cooperation exists between the JPS and MADA?

Dato’ Seri Haji Azmi KhalidUMNO · BNPadang BesarEN

I want to ask a little.

Minta maaf.

Dato’ Seri Haji Azmi KhalidUMNO · BNPadang BesarEN

Mr Chairman, pardon me, I want to ask a little about the Timah Tasoh Dam in my area. So what is the problem? Please give a little explanation. Thank you.

I think the Honourable Padang Besar also knows that the Most Honourable Menteri Besar of Perlis himself has said that when the dam has excess water, they have to release the water. So, I am worried about the four dams in the state of Kedah, afraid that the release of water during heavy rain will cause flash floods in low-lying areas near the dams.

Dato’ Seri Haji Azmi KhalidUMNO · BNPadang Besar

Minta maaf.

Do not say too much, Honourable, just a little.

Dato’ Seri Haji Azmi KhalidUMNO · BNPadang BesarEN

Mr Chairman, I ask for a little explanation. Whether or not the Honourable Member knows, all dams in such areas, all of them, when in Kedah it is also the same, all including Batu Pahat are also the same. So when the water is above the safe level, it must release water, and the area below will be flooded. It is the same in Kedah too, much of the flooding is caused by the release of water. So it is not that it will happen, but it has already happened in Kedah, whether or not the Honourable Member knows?

That is indeed what we are worried about for the times to come, yes. So, continuing regarding the cooperation between the JPS and MADA. I hope the JPS can also provide information or communicate more frequently with MADA. This is because when we ask MADA, MADA also does not know that another dam called the Noak Dam mentioned earlier will be established.

Secondly, regarding Item 15200 – Improving, Beautifying, Cleaning and Treating River Water and MASMA Infrastructure. I would like to know whether the ministry has taken any action or received any feedback from what has been done at Sungai Juru using Effective Microorganisms (EM) to clean the river water in Sungai Juru, carried out by the Penang state government. Sometimes we see that in rivers in Japan, this EM method is widely used to clean rivers. Can this technique not be used by us, at least in two to three rivers, so that we can obtain results from this EM process? Then, thirdly and lastly, Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. We know that the current unpredictable climate can cause the water level in the sea to rise. This means low-lying areas in our country, especially along the coastlines, may be submerged. We have read from the internet that many areas around the world, including in our country, will face flood problems perhaps 20 to 30 years from now. So, I want to ask the ministry, does the ministry have any preparations in this regard? And which areas may be involved with this rise in sea water, causing them to be exposed to flood problems when this global warming occurs? Thank you, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Sabak Bernam.

Datuk Abd. Rahman BakriUMNO · BNSabak BernamEN

It looks a little dazzling. [Laughter] Thank you, Mr Chairman. Sabak Bernam also wishes to take part in this ministry. Sabak Bernam wishes to take part in the Purpose P.23 Item 15100 – Coastal Erosion Prevention. For the information of Mr Chairman and Members of the House, recently I was informed by the Department of Irrigation and Drainage of the Sabak Bernam district that the allocation to prevent coastal erosion at Pantai Bagan Sungai Lang has been withdrawn. I also do not understand why, because we as Members of Parliament understand from officers at the higher level that coastal erosion is very critical in these three villages, especially in Bagan Sungai Lang, Bagan Beting Kepah and Bagan Sekendi at Pantai Kampung Sekendi. If we do not act quickly on this coastal erosion, I am afraid that these villages will flood, because the sea level is higher than the ground level in the residential areas here. Likewise, we hope that the previous allocation given in the amount of RM500,000, we also ask and hope for the technical staff of the Department of Irrigation and Drainage to do it properly. Because what we see now, what has been done has already collapsed at Pantai Sungai Lang. I do not know where the mistake lies. So, this will waste the government's money. So, I hope that in the Tenth Malaysia Plan, I hope coastal erosion will be given priority in the Sabak Bernam Parliament, especially Bagan Sungai Lang, Bagan Beting Kepah and also Bagan Sekendi. Secondly, I draw attention to Item 15300 – Dredging of River Mouths. We understand that this Sabak Bernam Parliament is indeed surrounded by rivers and coastal fishermen. So for years these fishermen have complained that when they are told there is not enough money, little money, but when we hear in this House, billions for projects here and there.

Datuk Abd. Rahman BakriUMNO · BNSabak BernamEN

So it is not anger, just a little hurt. Please give a little to our fishermen to dredge the river mouths, particularly at Bagan Beting Kepah, Bagan Sungai Lang and Bagan Sungai Burung. Next, Item 07100 – PERHILITAN, the Department of Wildlife and National Parks (PERHILITAN). This is the same as the Honourable Sri Gading just now. In my Parliament, we are experiencing a problem with the flood of monkeys and also wild boars in my Parliament. I do not know the reason before, they said they crossed the Perak River from Perak. I do not know whether this is the Honourable Tambun, right or wrong. So, this will disturb the farmers in Sabak Bernam Parliament where their main products such as coconuts, bananas and maize are eaten a lot by these monkeys and also wild boars. So, I also ask what steps the government can take to reduce this problem. If it is only shooting every year, we have already been doing this shooting, and if we also want to shoot, I hope the government provides a larger allocation to buy bullets, because villagers do not have much money to buy bullets. Buy from PERHILITAN, give free bullets, shooting is fine. Secondly, if we want to make these traps, we also do not know where to dispose of them, or whether the government or the ministry has a proposal to create one example of a "Monkey Village", for example in Pontian? [Interjection] Oh, not? [Laughter] In Bukit Katil? So these monkeys we take there, borne by the ministry, "This is an example of a Monkey Village" from the monkeys brought from other villages. Tourism, then, and a monkey industry too. I also do not know whether it can or cannot be done, wallahualam.

Datuk Abd. Rahman BakriUMNO · BNSabak BernamEN

But what is important is that we want to see the problem of monkeys and wild boars reduced. If it cannot be fully solved, at least it can be reduced for the welfare of the farmers there. So, gentlemen, that is all my speech, Mr Chairman. Thank you.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Ledang.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Thank you, Mr Chairman. I have only one item under B.23 which is Item 110000 – National Hydraulic Research Institute of Malaysia (NAHRIM). I want to ask, so far, what form of advice has been given by NAHRIM to the ministry, particularly regarding current rainfall distribution? This also includes the severe flood incident in 2006, and then recently it happened again in the north. In 2006 in Johor, in Pahang and in Kedah a little, and recently in Kedah and also in Perlis and Penang. I am confident that there are new indicators or the latest data that can be collected and subsequently used as important facts or important inputs for flood mitigation preparations in the future. That data is necessary. So far, what is the latest data that has been collected by NAHRIM to be presented to the ministry and subsequently become important data on the probability of floods occurring in the future that can actually be prevented? What further actions can be proposed by NAHRIM to the ministry so that flood mitigation problems are not only built in such a way but – not necessarily at a high cost.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Mr Chairman, it is also related to global warming, where we are well aware that temperatures have increased by 1.1 degrees Celsius over the past 50 years and, at the same time, have raised sea levels by 1.25 mm every year. This is related to what the Honourable Sri Gading and the Honourable Parit Sulong mentioned earlier, where sea levels are rising while this disrupts or affects the river drainage mentioned earlier, which at certain times is lower compared with the sea level. This means, Mr Chairman, these are fields for which we need an explanation from NAHRIM so that whatever planning we do in the future can be done accurately. If it enters my area, Mr Chairman, which is also related to the Muar River, it is related to Sekijang. The river is long, it is related. From the Muar River downstream all the way upstream to Sekijang, even to Negeri Sembilan. I heard recently that there is a big project. So, we want to know, so far...

[Bangun]

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Yes, please go ahead, Honourable Sekijang. May I, Mr Chairman? Just briefly, give one minute.

Mr Chairman (Datuk Ronald Kiandee)

Ya.

Thank you, Mr Chairman. Thank you, my friend from Ledang. Just now the Honourable Ledang mentioned Sekijang. Yes, I have also been informed that flood mitigation for the Muar River basin, which starts from Muar through Ledang, through Pagoh up to the Segamat district, I have been informed has been allocated RM1.2 billion, and the district of the Minister of Human Resources received more than RM200 million, I have been informed. I have also been informed that in my area, where a village named Kampung Jawa, will be divided and separated into two, namely a new drain will be built when this allocation arrives. So, I see this matter only on paper, which has been shown to me, but in terms of implementing it – although flood mitigation is good for everyone, but to implement this, I ask this ministry to look at the important interests there, especially the land of the villagers, the mosque, the cemetery and the school involved as well. This is because I see that the map taken is an aerial photograph and not of what is actually on the ground. From the air, of course rubber trees are visible, but inside there may be cemeteries and so on, which will involve the local people there. So I ask that the ministry or the department involved should discuss first with certain parties, especially from the people's representatives and also with the district officer, so that it does not create a tense atmosphere when it is to be implemented. This is because I see that when such a map is made, it is immediately implemented without informing the people. What is the opinion of the Honourable Ledang?

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Thank you, Honourable Sekijang. It is up to the Honourable Minister too, because if my boss can answer, but the Honourable Minister is the one who holds the power. That is what was said, I only want to ask about the latest progress. Finally, Mr Chairman, just now the Honourable Putatan, an expert doctor in the field of land surveying, mentioned concrete drains. So I want to ask about the advice of NAHRIM to the ministry regarding

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

these concrete drains, which may disrupt aquatic life, habitats and so on. Can these concrete drains be built in rivers or drains, or are there certain areas that, for example, involve strong currents and so on? I think this is related to our expert, the Honourable Putatan, so that later we can have a clearer and more explicit solution from NAHRIM and the ministry. Let there be no unclear assumptions, for example – this one can have a concrete drain, this one cannot have a concrete drain, and so on. That is all, thank you. I support.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Bangun]

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Kota Melaka.

Tuan Sim Tong HimDAP · PRKota MelakaEN

Thank you, Mr Chairman. I also want to debate only two items under B.23. But first, I want to support the Honourable Member from Bukit Katil, who is... [Interjection] Yes, I support the request or the debate from the Honourable Member...

Mr Chairman (Datuk Ronald Kiandee)EN

Yes, both from Melaka, Honourable Member.

Tuan Sim Tong HimDAP · PRKota MelakaEN

Yes, fellow Member from Melaka. We are well aware that flash floods in the city of Melaka are very severe and very serious, and that the allocation approved for Melaka for a project to prevent flash floods in Melaka City is RM128 million. I would like to ask the Honourable Minister, is it true? This is because the statement by the Yang Amat Berhormat Chief Minister of Melaka says that the balance of the allocation not yet disbursed to the state of Melaka has been cancelled and transferred to the 10th Malaysia Plan (RMKe-10). In the 9th Malaysia Plan (RMKe-9), this RM128 million should have been approved. This is very unfair, because the Melaka State Government really needs this allocation to complete or continue the project to prevent flash floods in the city of Melaka. I hope to get an answer. I would like to refer to Item 050100, namely Forestry Policy and Management. Mr Chairman, in Melaka forest reserves are indeed very scarce because Melaka is a small state, and forest reserves have had to make way for other development projects. With the limited forest reserves we have, I would like to ask the ministry about the enforcement and management of these forest reserves, because I have received several complaints and reports from residents in several places.

Tuan Sim Tong HimDAP · PRKota MelakaEN

First, the forest reserve at Bukit Senggeh. I understand that a company, Anggerik Aktif Sdn. Bhd., has bought a sand mine, and in my hand I have a letter from the Land and Mines Office (PTG) Melaka to the Melaka state forest officer, stating that the approval by the state Exco was for an area of only 13 hectares for this company to carry out sand mining. However, I understand that from February 2008, the area mined has been 30 hectares up to today. I would like to ask the ministry whether an investigation has been carried out and what the findings are, with permission. Another matter is at Terong: has the forest reserve there been gazetted as a recreational forest? I also have photographs showing that within this recreational forest, sand mining is still being carried out, and that we have spent a great deal of money developing this recreational forest,

Tuan Sim Tong HimDAP · PRKota MelakaEN

and local residents have told me that these projects have been built but then left alone. Has the management of the ministry or the Forestry Department carried out an investigation, and what are the findings or results of this investigation? I would also like to refer to Item 15100, namely preventing coastal erosion. Coastal erosion in Melaka in the 1990s was said to be in a very severe condition, but the Melaka Government has offered 18 companies the opportunity to carry out sea reclamation projects along the coast. Now I think more than 1,000 hectares have been involved in projects that have been implemented, although some are still ongoing. I would like to ask the ministry whether it is required that companies carrying out these sea reclamation projects must build breakwaters? If not, after these projects are handed over, perhaps some of them to the state government, we will have to spend a great deal of money to build breakwaters. Therefore, I would like to get an answer from the Honourable Minister, and these are only my two items that I wish to raise. Thank you, Mr Chairman.

Mr Chairman (Datuk Ronald Kiandee)EN

Honourable Members, I can only call the Honourable Member for Lenggong, and after that the Honourable Member for Langkawi, and then I will ask the Minister to reply after that. Please, Honourable Member.

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

Thank you, Mr Chairman. Item 191000 – Marine Parks. I support the firm action of the ministry to implement strict enforcement, which will be carried out next year by the National Marine Parks Department to protect coral reefs, which are a treasure of great value to the country. What I have observed before is that enforcement in marine parks has been carried out at the macro level, namely general offences such as fishing or anchoring on coral reefs. I think the time has come for micro-level enforcement to be carried out on offences such as stepping on or breaking coral, which should also be subject to action because these are also offences under the law. For that reason I propose that, for monitoring purposes, we instruct the enforcement officers we appoint to carry out diving activities to the sea bed to detect these offences, and therefore I would like to ask how many of our enforcement personnel hold diving licences and are able to dive to see the offences being committed. Next, how many marine parks have been gazetted, covering an area of approximately 2,000 square kilometres, located in Kedah, Terengganu, Pahang, Johor and Labuan? I also request the Minister's answer on how many tourists, whether from within or outside the country, have visited our marine parks. Turning to Item 153000 on river mouths. Once again I repeat, as I did when I interrupted the Honourable Member for Pasir Salak a moment ago, I request that the ministry, through the Drainage and Irrigation Department, carry out a detailed study and deepen...

[Bangun]

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

Just a moment, Honourable Member for Sekijang. The rivers of Perak, because they are the source of

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

the floods occurring now, because the river flow cannot flow into the Perak River, causing water to stagnate and eventually causing floods, and at this moment my area is also facing flood problems that are also caused by this problem. And in relation to that matter, just a moment, Honourable Member for Sekijang. I ask the Honourable Minister for an explanation of the proposal we have submitted for the Flood Mitigation Project...

[Bangun]

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

Small District of Lenggong, involving rivers such as the Lenggong River, Nerok River and Ketapang River, because this area has had floods three times this week alone, and it requires ....

Mr Chairman (Datuk Ronald Kiandee)EN

Let me pass, Honourable Member.

Untuk...

Lipis also wants to pass.

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

Please, Honourable Member for Sekijang.

Thank you, Mr Chairman, and thank you to my friend the Honourable Member for Lenggong. I would like to refer to dredging these river mouths. Mr Chairman, this item only provides for dredging river mouths, but the river itself has never been dredged, Mr Chairman. Of course, if the river has been dredged, it reaches the mouth. So I also ask that, apart from the river mouth being dredged, the entire length of the river and the places that also need to be dredged and cleaned be treated, so that it does not reach the river mouth or the sea, and when it has reached there, as people say, we only take action at the very end, when the cost has already become high, Mr Chairman. What is the opinion of the Honourable Member for Lenggong, because this has happened to the Muar River, which runs through my constituency? I ask for the Honourable Member's opinion.

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

I agree very much that it should be included in my speech. I ask the Honourable Member for Lipis...

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

A little, Honourable Member for Lipis?

A little. I have just received an SMS from my constituency: flash floods. Five houses are badly submerged, and 20 houses have been entered by water. I see that the river is actually a small river, but I think the river has never been cleaned and has never been taken into account, which is why this area has been hit by flash floods for the first time. So I ask the ministry to give attention not only to the big rivers but also to the small tributaries, because the effects of these floods are that the villagers have begun to get angry. What is the Honourable Member's view?

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

I agree with the view of the Honourable Member for Lipis just now, Mr Chairman, because it relates to the same matter of flash floods. I request that the ministry, through the JPS, be allocated with

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

emergency funds, so that when flash floods occur in my area, embankments break, rivers burst their banks, houses are damaged, and when we want to carry out rapid recovery the budget is insufficient, because there is no budget.

[Menyampuk]

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

That is why this emergency budget needs to be expedited, because it involves the problems of the people, which need to be expedited. I extend a welcome back to the Minister of Works from the Holy Land. However, I would also like to take the opportunity, since I mentioned flood mitigation earlier. I have four bridges that are indeed the cause of this flood problem. That is why I request that the Ministry of Natural Resources and Environment and also the JKR (Public Works Department) cooperate to look at the bridges at Sumpitan, Kampung Chain, Kota Tampan, and also the Bailey Bridge at Kota Tampan, which has not been replaced for years since last year, and which is the cause of the blockage of water flow. This water affects 2,000 residents there, and I could lose many votes, Mr Chairman.

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

I would like to move on. Earlier I was talking about monkeys; now I want to talk about elephants. This is my popular topic. I request this, because I am not only wanting to solve the elephant problem in my constituency, but also want to help the Honourable Member for Jeli. I ask the ministry, because these elephants are so numerous that we cannot shoot them, and they are causing problems for the people. What is wrong with Hutan Belum—sorry if the Honourable Member for Gerik gets angry—we make it an elephant sanctuary, a place for elephants to live. We will not only solve the problem of elephants disturbing people, but also use it as a tourism product. This can be done. I believe that if this is done, it can solve many problems in places such as Lenggong, Gerik, Jeli, Dungun and so on, because these are the surrounding areas, and indeed even if we build tall buildings there, people will still be angry. This is because their rubber and oil palm plantations are destroyed by elephants, so their income is affected, let alone the fact that rubber prices are high.

So, in Lipis, Mr Chairman, in Lipis too the elephant problem is a major problem, because almost every month elephants come and go on rampages, and many oil palm plantations are destroyed in particular. This is because perhaps some people just laugh at these elephants, but we should think about it: recently there was an oil palm planter who said that after three years his palms were mature, and then eight acres were completely lost. After that, because we cannot shoot these elephants, is there or is there not compensation that can be paid to those who suffer losses because of these elephants? If not, then please take those elephants to Hutan Belum.

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

I agree that compensation should be considered, because much destruction has already occurred. Although RISDA and FELCRA carry out rehabilitation, the debts are borne by the participants. This is an issue that angers the people. On that matter also, I ask the ministry to study land clearing projects, whether by FELCRA, FELDA or other departments. When the forest is opened, require each project to include safety elements. Build electric fences, with the costs borne by the relevant departments or agencies, so that they are not borne by the ministry. If a project goes to another ministry, that ministry bears the problems. This also needs to be taken into account.

Dato’ Shamsul Anuar NasarahUMNO · BNLenggongEN

One more thing I ask for, for the budget too, this emergency budget. Some departments, in my constituency in Perak, this year only planned to relocate 10 elephants. Suddenly that year, there were 20 elephants causing damage. Only 10 could be relocated, and the others could not be relocated because there was no budget. The process of obtaining that money is like building a bridge too. The forest has already been destroyed, and to request a project takes time. So these are matters that must be considered. For that reason I ask the ministry to examine this matter, and I also request, and we have already forwarded to the ministry, an additional budget. I thank the ministry very much for having implemented 37 kilometres of electric fencing. However, I request an additional RM3.3 million for additional elephant fencing at Tawai, in the villages all the way to Hutan Belum, so that the surroundings of my constituency can be fenced and many problems can be resolved. This will certainly be something that brings joy to the people of our country and is in line with our concept "Rakyat didahulukan." I believe that if the ministry can help with this matter, then I hope the problems of the people can be solved. Thank you.

Thank you, Mr Chairman. I have three matters, relating to Item 130600 – Irrigation and Drainage (JPS). Regarding Kuala Cenang or Sungai Cenang, because the Sungai Cenang is too narrow, it caused flooding in 2008, in August. However, this year there was no flooding in Langkawi; it only occurred in the Kedah mainland and in Perlis. The question is, during the flood of 2008, I was told by a JPS engineer that there was an allocation for next year to carry out the enlargement of the sluice gate located at Kuala Cenang. This is because the sluice gate is already old and leaking. It leaked because of the tsunami in 2004. [Mr Speaker presides over the Committee] So, until today, not a single action has been taken by the JPS. What has happened to what the JPS engineer mentioned? I hope the ministry can examine this matter and then build it. I think it is RM2 million or RM3 million, as I understand. A small figure indeed, but it involves many who are affected, namely about 300 houses that had to be evacuated during the 2008 flood, involving 2,000 residents. Secondly, related to Item 090000 – Marine Parks, relating to the sea. I am still doubtful about the answer given during question time the other day. I am still doubtful because I hope this matter can truly be monitored by the ministry, namely the marine parks such as Pulau Payar, Pulau Lembu and Pulau Kaca, which attract tourists. It can be said that 10,000 tourists come to these islands every month, involving 120,000 tourists to Pulau Kaca, Pulau Payar and Pulau Lembu. I hope this matter can be monitored by the ministry so that it does not happen – the facilities can be looked after and, thereafter, breaching of coral reefs can be avoided. Furthermore, I am still doubtful about the air pollution occurring in the Teluk Yu and Ewa areas in relation to the cement factory that has been built. I am still doubtful even though the Honourable Minister has said that monitoring has been carried out, but there is still

dust settling on the roofs of houses and in certain areas. I think this matter must be given serious attention by the ministry, because dust problems are all health problems. Of course, if the health of residents is polluted or related issues arise, then we in Langkawi certainly depend on tourists, and tourists will certainly not come. That is, for me, the three points I wish to raise today. Thank you, Mr Chairman.

Mr ChairmanEN

The Honourable Minister, please.

Tan Sri Datuk Seri Panglima Joseph KurupPBRS · BNDeputy Minister of Natural Resources and Environment · PensianganEN

Thank you, Mr Chairman. First of all, I would like to thank all the Honourable Members who have given views and proposals on matters touching on the scope of my ministry during the debate on the Supply Bill 2011 at the Committee stage in this honourable House. Without wasting time, Mr Chairman, I will proceed directly to answer the doubts and criticisms of the Honourable Members. The first is the Honourable Member for Jempol. The Honourable Member for Jempol proposed that my ministry design a system that can protect water sources. Indeed, Honourable Member, my ministry has several ways to protect water sources. We here have approximately 11 ways for us to protect water. For example, I touched on implementing the 1Negeri 1Sungai Programme to conserve and restore rivers and their surrounding areas that have been polluted or damaged to their original condition.

Tan Sri Datuk Seri Panglima Joseph KurupPBRS · BNDeputy Minister of Natural Resources and Environment · PensianganEN

However, to further strengthen, Mr Chairman, the government is aware that, given the reality of water resource conservation, several ministries and government agencies have set up the Water Resources Management Committee (Water Quality and Quantity) to manage efforts to safeguard water resources. Among the steps taken by the ministry are those I have just mentioned. The members of this Committee are chaired by the Ministry of Energy, Green Technology and Water (KeTTHA). Next...

Dato’ Haji Lilah YasinUMNO · BNJempolEN

May I ask for an explanation about water sources, Honourable Member? There is confusion among our officers about the interpretation of water catchment areas and water source areas. Water catchment areas can indeed have their logging relaxed. If possible, selective logging is even better. However, I am thinking about how important it is that water sources do not run out of river supply, so we enforce that these water source areas are not permitted any logging at all. Today, how many of our water sources no longer have any water supply because of forest destruction and logging? If we allow this to continue, it means that our national heritage will be exhausted in the future in providing clean water to our children.

Thank you, Honourable Member. There is no confusion. Previously, this catchment area was gazetted, and after it was gazetted as a water catchment, logging was strictly prohibited there. We will monitor to ensure that no logging is carried out in areas that have been gazetted as water catchments. That is indeed the measure we have taken.

Next, Honourable Jempol also asked about research on tree species that are suitable and safe for Forest Recreation Parks. Specifically, no research has been carried out because the area of the Forest Recreation Parks has not been planted with landscape trees, as these areas are already overgrown with existing forest trees. If there are idle spaces that can be utilised, we will endeavour to plant suitable timber on that land. Next, Honourable Jempol also asked about the allocation for the maintenance of the Marine Park in Port Dickson. Port Dickson does not have a Marine Park; instead, it has two areas known as fishery prohibition areas under the purview of the Ministry of Primary Industries. The allocation of the Ministry of Natural Resources and Environment is only for the maintenance of marine parks that have been gazetted as Marine Parks. He also asked about the River Project in parks. For the information of the Honourable Members, there is no special project for river projects in parks. However, the government has provided an allocation for the 1Negeri 1Sungai programme, in which the selected rivers are located within towns. In the Tenth Malaysia Plan, the initial allocation provided for this purpose is a total of RM176 million. Next, Honourable Jempol also asked about the River project. For the information of the Honourable Members, the rivers involved in the 1Negeri dan 1Sungai Programme are approximately 13 rivers, including the Perlis River, Sungai Petani, Sungai Penang, Kinta in Perak, Sungai Penchala, Selangor, Sungai Temiang in Negeri Sembilan, Sungai Melaka, Sungai Skudai in Johor, Sungai Galing in Pahang, Sungai Pengkalan Chepa, Sungai Hiliran in Terengganu, Sungai Miri in Sarawak, and Sungai Papar in Sabah. These are indeed the rivers involved in the 1Negeri 1Sungai Programme. Honourable Jempol also asked about the government's Jempol Master Plan, and how much allocation was given to the Jempol area. For the information of the Honourable Members, the study of the Jempol Master Plan is financed by the Negeri Sembilan State Government, and there is no allocation for that area. However, the government always assists state governments. Next, Honourable Jempol also asked about coastal erosion in Port Dickson. The government is always concerned about the problem of coastal erosion, including in the Port Dickson area. However, no allocation has been provided. Nevertheless, the government always endeavours to propose measures so that the problem can be overcome. Honourable Jempol also asked about the results of the study on groundwater and its use as drinking water. For the information of the Honourable Members, the study on groundwater has been and is being carried out by the Department of Minerals and Geoscience. The results of the study show that the mineral content of the water is suitable for drinking. As a result of this study, groundwater sources have been developed and used as supply together with surface water and as an alternative water supply in areas where piped water supply is not available. Groundwater has also been used in Perlis, Kedah, Kelantan, Terengganu, Selangor, Sabah, and Sarawak. Honourable Jempol also asked about mineral water flowing out of riverbanks. With regard to mineral water flowing out of riverbanks, so far the ministry has not carried out any study simply because it is not the ministry's responsibility. However, the ministry will also study this matter. Still, Honourable Jempol, he asked about plans to preserve and maintain the Sungai Menyala Forest Reserve, Port Dickson, for the purposes of learning and research.

For the information of the Honourable Member, the Sungai Menyala Forest Reserve has been gazetted as a Permanent Forest Reserve for the purposes of research, learning, and recreation. In addition, for the information of the Honourable Member, this area has also been designated as a seed production area. So, after that, we of course look after this area. Next, the Honourable Member for Kubang Kerian asked about the Continental Shelf Act and also the Petroleum Act, whether, in terms of their administration, they would conflict. For the information of the Honourable Members, the Continental Shelf Act only concerns the position of the continental shelf and a country's claims to its rights over the continental shelf. The Continental Shelf Act clearly states that any matter concerning petroleum must refer to the Petroleum Development Act and not the Continental Shelf Act.

Therefore, all the issues raised by the Honourable Member concerning petroleum fall under the Petroleum Development Act, and there is no conflict with the provisions on petroleum rights in the Continental Shelf Act. The Honourable Member for Kubang Kerian also asked about local mineral products that use the Malaysia brand for the international market. I believe the Honourable Member knows that the local mineral used to produce international products is tin ore. It is used to make pewter-based decorative items. A well-known brand used is Royal Selangor Pewter. As for well-known mineral water brands such as Spritzer and Cactus, those that are currently available are exported. The Honourable Member for Kubang Kerian also asked about mapping around Batu Putih Tubir Selatan. For the information of the Honourable Member, JUPEM, through the Technical Committee that has been established, is discussing through a series of meetings with Singapore and has agreed to carry out joint hydrographic surveys after a memorandum of understanding is signed between the two countries, and will hold a meeting in November 2011. The Honourable Member for Kubang Kerian also asked...

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Honourable Deputy Minister, I seek clarification. If I am not mistaken, I heard just now that our country, through JUPEM and Singapore, is only focusing on hydrographic surveying. The question raised by the Honourable Member for Kubang Kerian is about maritime boundary, which we must determine, not hydrography. Hydrography only determines the depth of the sea, whereas what we want is maritime delimitation. That is what I am seeking clarification on. remind

The first topic they face, which they are focusing on for carrying out mapping, is hydrography first. I said just now that they are holding discussions between the two countries, and perhaps these are the second topics to be discussed, concerning maritime matters. The Honourable Member for Kubang Kerian also asked whether the national boundary had changed, causing Block F to be handed over to Brunei. Regrettably, this issue is not under the jurisdiction of my ministry; it is under the Ministry of Foreign Affairs. So, the Honourable Member may not be asking the right question. The Honourable Bakri asked about a new solid waste disposal site in Pagoh, Muar, Johor. For the information of the Honourable Member, the Ministry of Housing and Local Government is preparing an EIA study, but the Department of Environment has not yet received

the request, has not yet received the report. Therefore, the local authority is still using the existing site. However, the Department of Environment will assist in expediting the process of approving this EIA report once it is submitted to the Department of Environment. The Honourable Batang Sadong questioned whether NGOs should be given environmental education because they are members of the public who will be responsible for protecting the environment in any place. For the information of the Honourable Member, the Honourable Batang Sadong is not present. If the Honourable Batang Sadong is not here, there is no need for me to answer, Mr Chairman. No need to answer? I think there is no need to answer because there is still much more that I want to touch on here. Is the Honourable Putatan present? The Honourable Putatan asked about flooding in Sungai Putatan in the Putatan area. He asked whether there is an allocation or not to carry out certain works. However, regrettably, there is no allocation for 2011. Nevertheless, the ministry has carried out various works. There are also some works that...

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Honourable Deputy Minister, I seek clarification. Seeking clarification. At about 1.30 earlier, Honourable Deputy Minister, it was shown that Sungai Petagas had been encroached upon by a company called Global Upline, and some houses were swept away due to erosion, caused by river construction works from the airport to Petagas. I think the Honourable Deputy Minister should also, if possible, see what has happened. So, are there any actions or efforts by the ministry to ensure that erosion damage to riverbanks does not occur when there are government projects? This has sparked anger among the people of Putatan towards the Barisan Nasional government. It is true that the Barisan Nasional government is carrying out good development, but it should not reach the point where people become angry. So, I seek some clarification from the ministry on what role it plays when it sees the people injured as a result of the construction of a bridge operated by a company in Kota Kinabalu. It was only at 1.30, on TV3 earlier.

Thank you. As the Honourable Member from Putatan, I also believe that the Honourable Member has a responsibility to ensure that the bridge construction work is carried out properly and does not cause damage to anything. However, if the riverbank has been damaged by floods, we have no objection to carrying out a study. If it really needs repair, then we will try to obtain an allocation. The Honourable Putatan also asked about three projects approved for JUPEM, such as mapping, surveying, maintenance of international boundaries, and also the e-Kadaster network system. For the information of the Honourable Member, JUPEM implements projects in stages. We cannot carry them out all at once. I would be lying if I said that we could obtain allocations for all the work that lies before us and then carry out all of it. So, it is orderly if we do it in stages, but rest assured, we are trying our best so that these matters can be fully implemented later.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

I seek clarification from the Honourable Deputy Minister.

Cukuplah, cukuplah.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Have the officers from JUPEM requested sufficient allocation to implement, where we see what is happening between us and our neighbouring countries, where international boundaries are very important to us. So, have the officers from JUPEM prepared sufficient allocation to overcome the problem of our international boundaries, and also the matter of the second point, which is that we will lead the country towards becoming a developed and high-income nation, which results in important information when we plan development involving this land. That information, the geospartial system, is very important for planning our country's economy, Honourable Deputy Minister.

Mr Chairman, my friend here is a surveyor. So perhaps he can tell me what has been done, but in terms of land permits, that allocation. Every year we do our utmost to provide certain foundations and, according to our capacity, to carry out that work in the coming year. We try our very best to obtain allocations to carry out the works touched on by the Honourable Member just now. However, sometimes when we request funds from the Ministry of Finance, they are also limited because this is not the only work we do; there is a lot of other work we can do. [Interjection] The Honourable Putatan also asked about the total number of rivers maintained across the country. In 2010, the number of rivers maintained across the country was 390 rivers, and the allocation spent was a total of RM25.5 million. The Honourable Kinabatangan asked – oh, I do not need to answer this, they are not here. Is the Honourable Pokok Sena present? [Interjection]

The question is about what design is implemented by the Department of Irrigation and Drainage. The design of tidal gates: most of the tidal gates I have seen are not effective and are not provided with overflow; everything is jammed. Air can still enter, and salt water can still enter. This is wasting of public funds, with permission, not effective. I have evidence of this; in my area, there is one that we implemented last year. High tide still enters – same level, with permission.

Be fierce, Honourable Putatan.

Yes, you must ask the engineer why this has happened. Is the Honourable Pokok Sena present?

Yes, he has gone to have tea.

The Honourable Pokok Sena is not here, so there is no need to answer.

Having tea, having tea...

Is the Honourable Indera Mahkota here?

Tuan Azan IsmailPKR · PRIndera Mahkota

Ada, ada.

Yes, yes, yes...

Okay. The Honourable Indera Mahkota asked whether the Ministry of Natural Resources and Environment has an Act to administer and protect the National Marine Park. My ministry does not yet have a National Marine Park Act. At present

the Ministry of Natural Resources and Environment uses the Fisheries Act 1985, from Section 41 to Section 45, for the purpose of administering and protecting marine parks. The Honourable Indera Mahkota also asked about the functions of marine parks. I would like to list here only the important functions, namely: (i) protecting marine biodiversity for the purpose of maintaining the ecosystem; (ii) enhancing and maintaining marine habitats that are facing extinction; (iii) conserving and conducting research on marine flora and fauna; (iv) enforcing regulatory acts related to the management and development of marine parks; (v) conserving marine resources and the impact of tourism, and balancing with the rate of carrying capacity; and (vi) planning, implementing and developing education and public awareness programmes on marine life. The Honourable Indera Mahkota also asked about the value of waqf land, which may be worth RM42 billion, and which may increase if the waqf land records are updated through the e-Tanah project. He also asked, what is the status of the e-Tanah projects currently being implemented? He is of the view that the system has been slow in providing up-to-date land information. For the information of the Honourable Member, the e-Tanah project is one of the electronic government (e-Government) applications monitored by MAMPU with the goal of improving the government service delivery system. The e-Tanah project was first implemented on an apprentice basis in Penang in 2005 and was extended to Negeri Sembilan and Melaka starting December 2008. The objectives of the e-Tanah system are to improve efficiency, integrity and transparency in the delivery system, establish a single database, target land, and reduce bureaucratic red tape. In terms of the progress of the e-Tanah project implementation in Penang, it has been adopted in all land offices and in the Office of the Director of Lands and Mines Penang. By using this system, it was found that the quality of land administration services has improved, and land transfer transactions can be completed within one day. Revenue collection has increased, and online collection has successfully collected a total of RM960 million from 1 October 2007 to 4 October 2010.

Tuan Azan IsmailPKR · PRIndera Mahkota

[Bangun]

Mr ChairmanEN

Please, Honourable Indera Mahkota.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Thank you, Mr Chairman. Among the purposes and intent of my raising the matter of the progress of this e-Tanah project is, firstly, as I mentioned earlier, because there is concern about overlapping or duplication of information for cases involving waqf lands, which I am certain of – coincidentally, the former Prime Minister is in the House. He also raised concerns about the face value of lands under waqf status, which we should resolve electronically under the e-Tanah project. Not only that, Honourable Deputy Minister, there are also several cases I have studied which also involve lands under

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Hindu Joint Family ownership. The status of Hindu Joint Family that cannot be determined, for which the relevant department only gives answers because the implementation and application process of e-Tanah is still ongoing. For that reason, I ask about the progress or development of the implementation of e-Tanah, because this item is in Question P.23 about the amount and so on, which still cannot be fully applied. If that is so, it means we still face the problem of providing up-to-date data or information if any problem arises regarding ownership. This is especially, in my opinion, for lands under waqf status, which are very complicated to give identity or classification to, because e-Tanah is still in an imperfect state. I think that is what was meant and acknowledged by the Honourable Deputy Minister. In addition to this, I would like to ask when, approximately, will the e-Tanah system be fully completed or applied, or its services offered to our society and people? Thank you.

Thank you, Honourable Member. I admit that when we started this project, the collection of data was a major problem, and there was duplication of the data. However, from time to time we are correcting it. The ministry has taken steps by carrying out data cleansing work, updating strata title data, and strengthening the development model and enforcement. We have also asked the contractor carrying out the work to also be responsible for maintenance, implementation and data population until December 2011.

As to the question of when this e-tanah system can be implemented nationwide as a whole, I cannot give an assurance here as to when, because in two states, namely Melaka and Negeri Sembilan, the data concerned are still being obtained. The Honourable Member for Pasir Salak asked about the dirty drainage and sewerage systems in towns. For the information of the Honourable Members, the ministry has prepared an environmentally friendly drainage manual, and it is the responsibility of the local authorities (PBT) to implement it in order to establish a good drainage system. In other words, my ministry has prepared certain plans, and ideally, the local authorities should take these as guidelines so that drainage problems can be reduced. The Honourable Member for Pasir Salak also asked about the upgrading of rivers and the beautification of the Sungai Perak. No allocation has been provided for the dredging of the Sungai Perak, but the cooperation of various agencies is needed to beautify the Sungai Perak in question. The Honourable Member for Parit Sulong asked about the allocation for dredging work at the estuary of the Sungai Batu Pahat. So far, there is no allocation for this dredging work, but a study on the master plan for flood mitigation in the Sungai Batu Pahat basin was carried out by the Department of Irrigation and Drainage (JPS) and was completed in 2009. The main objective of this study was to identify measures to overcome flooding in the Sungai Batu Pahat basin, including the Parliamentary constituency of Parit Sulong. In the study, several methods were proposed which can directly and indirectly overcome the problems in the Parit Sulong area. Any questions?

Mr ChairmanEN

Honourable Member for Indera Mahkota, please.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Thank you, Mr Chairman. I just want to make sure. I have another question that I raised earlier concerning flood mitigation, namely the total amount that was ever mentioned or proposed and approved compared with the latest amount spent on flood mitigation projects. I am not sure whether the Honourable Deputy Minister will answer or has the data for my question earlier. I want to know. Thank you.

I will answer in writing, Honourable Member. Is the Honourable Member for Kota Raja present? The Honourable Member for Kota Raja asked how much the allocation is for flood mitigation projects in the Klang district. No allocation has been approved for the year 2011. However, the government will pay due attention in overcoming this problem. We will make an appeal...

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

May I ask the Honourable Deputy Minister? Does this mean there is no allocation this year, or is it postponed to next year? Or is it only ad hoc patch work here and there, with permission, because that does not solve the problem. Is there or is there not any at all? How is it?

Does the Honourable Member mean for the year 2011?

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

If not for the year 2011 in this budget, is it for the year 2012? How is it?

For the year 2011 there is no allocation.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

So, does that mean an application has been made by the relevant department?

There certainly is. We have made – after the first service was made and rejected, we also made an appeal to the relevant party to consider it further. However, there is no guarantee whether we can obtain that funding or not, because this is subject to the Ministry of Finance taking other ministries into account. The Honourable Member for Kota Raja also asked who monitors highlands below 3,000 feet and less than 50 hectares in area, and how many developers have been prosecuted by the Department of Environment (JAS) for those who pollute the environment by violating the highland development guidelines. For the information of the Honourable Member, the development of these areas is under the administration of the local authorities and the state. A highland development guideline has been prepared by the Ministry of Housing and Local Government, in cooperation with the Ministry of Natural Resources and Environment, to assist the local authorities in granting approval for highland development. As I said earlier, my ministry has also formulated a guideline for local governments to grant approval for the development of highland. So, in fact, this power lies under the power of the PBT. The Honourable Member for Kota Raja also asked about the efforts of the Ministry of Natural Resources and Environment in formalising environmental education in the national official education system. At present, Honourable Member, there is a committee comprising the Ministry of Education

Malaysia, World Wide Fund for Nature, the Department of Environment, Universiti Putra Malaysia and also Universiti Malaya, as well as school principals, to prepare an environmental education module in the subjects of Science, Geography, Bahasa Melayu and English, and it will be implemented first in four schools as a pilot, namely in Johor, Kuala Lumpur, Kedah and Pahang. Under marine education, the Ministry of Natural Resources and Environment has cooperated with the Ministry of Education, where the marine environmental education module has been approved by the Ministry of Education for use under the co-curriculum of Kelab Pencinta Alam and Pengakap Laut.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Honourable Member, I would like to return briefly to... I mentioned earlier, for example, at Tanah Tinggi Lojing, there is development that causes environmental pollution and soil erosion. So, just now the Honourable Member answered for land below 3,000 feet and 500 acres. What about the developments that exist now, where even at a glance as we pass by, Honourable Member, the development is indeed uncontrolled? So where is the role of JAS? Thank you.

Mr Chairman, regarding the developments that exist now, which may have violated the rules imposed by the government, this is actually being studied. We are studying what else we can do – not what brings benefit to the people, but what can overcome the problems we are facing now.

Now we have a guideline that sets out how high we can develop, and how far we can develop moderately and where. What level of land we can develop fully. All of these actually require an EIA, and from the EIA study it will impose certain conditions.

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Clarification. Ledang. May I, Mr Chairman?

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Thank you, Mr Chairman, thank you, Honourable Deputy Minister. I wish to follow up on what the Honourable Member for Kota Raja said just now. I see, Mr Chairman, that this JAS, the Department of Environment, has no teeth. Although there is a certain act, I see that when it involves development in a particular area, JAS is more of a reference point only. For example, when the PBT wants to develop an area, JAS is only referred to in order to state whether it agrees or not, whether it is possible or not, and so on. But whether it agrees or not, for example JAS agrees to a development on condition of such-and-such an EIA, what action should be taken, and so on, but at the implementation level, it is the PBT that implements it. And the PBT seems not to fulfil JAS's requirements. So I want to ask here, perhaps if we are serious about this environment, can the Department of Environment sue and take direct action against the PBT so that the PBT does not implement a project developed by the developer, which they approve but which violates the Environmental Act that has been in place for so long? Can JAS sue the PBT? Sue, for example, the PBT in Kelantan, sue the PBT of the state of Selangor, sue the PBT in other places.

PBT Johor.

Honourable Member, I think it is not right for the Honourable Member for Ledang to say that JAS only goes as far as approving or approving jointly. JAS has the grounds to sue. The enforcement power that the state government does not have. Since this concerns the Department of Environment, and this power does not lie with the state government. It only lies with the Department of Environment.

Yes, I agree. What about this Honourable Member for Ledang.

Thank you. This too, when we carry out our duties in a matter, we must refer to the Constitution as well. If the Constitution says that this is the power of the PBT, then we leave it to the PBT to do its best. But within the EIA, within the EIA conditions that we impose, the EIA also has the power to take action against the parties responsible for doing something wrong. However, as far as I know, correct me if I'm wrong. I think perhaps there is no provision for JAS to take action or to sue this PBT.

I think it is not suing the PBT but the developer. It is not true to say that the Department of Environment has no power. But perhaps the problem is the manpower problem of the enforcement officers of the Department of Environment. For example, in Kelantan, how many enforcement officers are there in the state of Kelantan? So perhaps the enforcement problem is a manpower problem from the Department of Environment itself? Requesting clarification.

Thank you, Honourable Member. Whatever we try to do to enforce the conditions that we impose in the EIA. But sometimes we also hope that the developers will be responsible. It is not good for us to keep coming to that place telling them to carry out work. This too depends on the developers to be responsible. But since we informed the developer that it had violated the EIA conditions, we did not hesitate to take action. This is what we actually do. With regard to the staff, we admit that we do not have 100% staff to look after something. But we have staff that can be said to be reasonable for carrying out certain duties, so that as far as possible, the developers concerned can know to follow the conditions imposed in the EIA. The Honourable Member for Bukit Katil asked about flash floods in Melaka. How much is the allocation, whether any allocation has been given. Likewise, what I want to say here is that no allocation has been provided for the year 2011. However, the ministry is always trying to overcome this problem, but the cooperation of the state government is also needed for this purpose. Sometimes the state government has certain allocations to overcome drainage problems, floods and so on. However, in Melaka, in fact, we have allocated a lot to carry out work to overcome floods in Melaka. But what the Honourable Member referred to just now is whether there is an allocation to overcome the flash floods. That is what I said just now, that no allocation has been provided.

Datuk Md. Sirat AbuUMNO · BNBukit KatilEN

Honourable Deputy Minister, may I... Bukit Katil. This allocation has been approved at RM128 million. What has been paid is RM50 million. Another RM78 million has not been paid. That is what

Datuk Md. Sirat AbuUMNO · BNBukit KatilEN

I asked. So why was the RM78 million withdrawn, when this flood mitigation project is not yet completed. That is what I asked.

I will answer later. I will check whether it is correct that it must be withdrawn or not. Second, I will check what the reasons are for the withdrawal, if it is indeed withdrawn. The Honourable Member for Tawau asked about the allocation approved for 2011 for the Tawau district. There is also no allocation for 2011 for the Tawau flood mitigation project. However, the JPS has resubmitted it to the ministry for consideration and implementation in 2011. I have been informed that the Sabah State Government will allocate approximately RM1 million to carry out a study and the work related to it in 2011. Then in 2012 approximately RM3 million will be allocated. The Honourable Member for Tawau also asked in relation to the charcoal power plant in Lahad Datu, Sabah, what the cost of the EIA report is and who bears that cost. What is the ministry's next action on TNB regarding this project. For the Honourable Member's knowledge, the ministry has no information on the cost of the EIA study for the Lahad Datu charcoal power plant, because it was carried out only by the developer, which is TNB. The EIA study report was not approved by the Department of Environment because it did not meet the requirements of the EIA regulations.

The developer was informed on 18 August 2010, but until now TNB has not yet resubmitted any new EIA report for the project. The Honourable Member for Tawau and Pendang asked about the effectiveness of effective microorganisms. The use of effective microorganisms has improved river water quality in the short term. Its implementation now involves rivers under the 1Sungai dan 1Negeri Programme. Its use is effective for initial treatment in holding ponds before being discharged into rivers. Mr Chairman, the Honourable Member for Sri Gading and others also asked about the issue of floods. The Honourable Member for Sri Gading is not here? [Interjection] The Honourable Member for Sri Gading is here. [Laughter] He asked about the issue of floods and sufficient allocation, raised by the other Honourable Members. The Department of Drainage and Irrigation has indeed planned to implement the Flood Mitigation Plan (RTB) throughout the country. However, RTB projects are implemented in areas where the allocation has been approved. The Honourable Member for Sri Gading also asked what other efforts...

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Honourable Deputy Minister and Mr Chairman, before moving on to the second question. When we had the major flood in 2006, the whole country was busy, from the top leadership right down to the bottom. "We must overcome floods, we must do flood mitigation, we must deepen the rivers, we must widen the rivers." As soon as it was over, Honourable Deputy Minister, that story disappeared. The heat from just now, gone. I do not blame the Ministry of Natural Resources and Environment, and I actually want to thank the JPS, the JPS officers in the Batu Pahat district who worked very hard, Honourable Deputy Minister. During floods, they worked 24 hours. I express my thanks and congratulations.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

I do not blame the Honourable Deputy Minister's ministry, but I want to touch on other ministries. If we are not serious about this matter, these things will recur. Tomorrow it will be hot again, rise again, become intense again, fervent again! As soon as the floods are over, that's it. This is our problem in Malaysia, Honourable Deputy Minister. Thank you, Honourable Deputy Minister.

Thank you, Honourable Member, touching on seriousness, our seriousness, indeed we are serious about overcoming this flood problem. We have made certain plans because nowadays our weather is unpredictable all of a sudden. Perhaps flash floods may occur. So, we are in fact very serious looking after this problem. But the main problem is whether we can obtain the allocation or not to carry out that work. Thank you, Honourable Member.

Dato' Samsul Anuar NasarahUMNO · BNLenggongEN

Honourable Deputy Minister. Regarding this flood.

Dato' Samsul Anuar NasarahUMNO · BNLenggongEN

I think the ministry must be serious about this allocation because if there is no large allocation to overcome the flood problem, it will cause destruction of public infrastructure, economic projects, public property and, in the end, will destroy much of what the government has built before. What harm is there in our focusing on this matter? We have the technology, if we can detect tsunamis. I believe the ministry too must move forward to look at and anticipate matters that will happen so that destruction does not occur. In Kedah, not only must the property in homes be moved, but also school property and village halls. Isn't much destroyed? Therefore, by whatever means, the ministry needs to submit to the government to seek a budget. If not, many things we have done all this time will be destroyed in the blink of an eye. Therefore, I ask the ministry to be serious about this matter. This is not a joke, Honourable Deputy Minister, because this involves national planning and the problems of the people.

Thank you, we will take note of that. As I said just now, we are indeed serious about overcoming this problem.

Dato' Mahfuz bin Haji OmarAMANAH · PHPokok Sena

[Bangun]

I think that is enough. It is taking time.

Dato' Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

A brief clarification. My question just now, I did not have time. I had a meeting just now, I apologise. Mr Chairman, I want to ask for clarification from the Honourable Member, whether the ministry prepares a comprehensive master plan to look at all sides, coordination with other ministries to look at this flood problem. Otherwise, as my friends mentioned just now, we only talk too much, "tremble-tremble" when the situation befalls us, but after that we do not do anything. This is because it will have economic impacts. For example, in Alor Setar, the airport was closed for a week. Then the repair process will take place after this. If it happens in residential areas, it will affect the decline in market value

Dato' Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

property because people no longer want to buy in those areas. They say, "This is a flood area, why should we buy?" So this has a big impact, and then every year we will spend money, aid, this and that, and so on. It would be better for us to prepare a comprehensive master plan to look at all angles, as I mentioned earlier. The drainage problems and the projects carried out by other ministries and so on must be taken into account. So, I fear that the Honourable Member's ministry will focus on the flood problem while other ministries just carry out projects. It does not consider the drainage problem. So, I think this needs to be looked at comprehensively.

I agree with the Honourable Member, but in fact we have certain plans to study the whole matter. We are constantly renewing our approach. One of them is the integrated approach relating to river basin management. We are studying all of that: what the causes are, timber logging and so on, the causes of pollution and so on. We take all of this into account. So, one of the studies that has been completed is in Johor, and we are taking this as a pilot for other river basins. That is a new approach that we are taking to reduce our flood problem. The Honourable Sri Gading also asked about what other efforts are being carried out apart from the operations to catch and shoot the monkeys that are causing problems. I strongly agree with the opinion of the Honourable Sri Gading, who said do not just catch and shoot. We have to find a way to overcome this problem. However, for the information of the Honourable Members, apart from operations to catch and shoot dead the problematic monkeys, the Department of Wildlife and National Parks (PERHILITAN) is also carrying out a sterilisation programme to reduce the breeding rate of these monkeys. The Department of Wildlife and National Parks (PERHILITAN) has been given a special allocation to manage wildlife nuisance problems, especially monkeys, amounting to RM5 million under the Tenth Malaysia Plan. We are providing allocations to overcome the problems of these naughty animals. Proposals for additional staff have been made

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

The Honourable Deputy Minister.

However, its implementation has been frozen by the government first.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

The Honourable Deputy Minister. [Laughter] This evening it's alright, Mr Chairman, can we...

Mr Chairman

Sila, sila.

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Want to sterilise these monkeys, Mr Chairman. [Laughter]

[Speaking without using the loudspeaker]

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

Just now you said a monkey sterilisation programme. That means every male monkey must be caught. [Laughter] I don't know how, or whether sterilisation is only for the female monkeys

Datuk Haji Mohamad bin Haji AzizUMNO · BNSri GadingEN

only? I don't know. If it's fine, then there's no need, Mr Chairman, okay lah.

That will be the last resort if they're going to use it, if there are these troublesome monkeys, to shoot them or knock them on the head. We are looking for other ways, other methods, so that they can be relocated to another place if possible, and so that they are chased away and do not enter the villages to invade the orchards of our farmers. Mr Chairman, the Honourable Member for Hulu Langat asked about the development plan for forest plantations. For the information of the Honourable Members, the allocation applied for is for the agroforestry and forest rehabilitation projects through activities of planting and conserving forest tree species, herbal trees and also commercial agricultural trees, as well as planned efforts to conserve the productivity of forest areas, especially poor and hidden forest areas. The implementation of this project will emphasise two matters: the involvement of local communities and the conservation and maintenance of abandoned and degraded areas. The Honourable Member for Hulu Langat also asked about the Land Coordination and Operations Details under head 020300 amounting to RM137 million, and how it is distributed to state land offices. He also asked about Details 020400 concerning the Special Task Force, and what the functions of this special task force are in the states. For the information of the Honourable Member, Details 020300 concerning Land Coordination and Operations amounting to RM137 million are payments of land taxes collected by the Federal Government to the state governments and operations for land coordination and enforcement. As for the Details under 020400 for the Special Task Force, it is for the purpose of paying salaries, emoluments and administrative matters of this special task force which is stationed in the states to assist the land offices in expediting land administration matters such as registration of applications and other matters, as well as collection of tax arrears at the land offices. Mr Chairman, there is much more that I may not have answered here, but I can only get a few questions here, namely the Honourable Member for Gelang Patah and also the Honourable Member for Sabak Bernam and others, so I request that...

Ir. Haji Hamim bin SamuriUMNO · BNLedangEN

Mr Chairman, I apologise, but regarding the Honourable Member for Ledang, it is important, about the Malaysian Hydraulic Research Institute, it is very important.

I will answer in writing later. It is better that I answer in writing. The Honourable Member for Gelang Patah raised the issue of river pollution at Kuala Sungai due to the construction of the Coastal Highway, which affects the income of fishermen. He also raised the issue of the developer of Taman Amira discharging sewage that pollutes the river, and asked the ministry to investigate and take action. The Department of Environment has actually carried out an investigation and an investigation paper has been prepared to take legal action against the developer of the project. Secondly, the Department of Environment will carry out an investigation and take action if the law is breached, in answer to the second question just now. As for the Honourable Member for Sabak Bernam, he asked how the government overcomes the problems of monkey and wild boar nuisance that

often destroy agricultural crops. The Department of Wildlife and National Parks (PERHILITAN) has been allocated a total of RM5 million for wildlife conflict management under the Tenth Malaysia Plan. This includes the management of monkey and wild boar conflicts in Sabak Bernam, and this is also to answer the question from the Honourable Sri Gading just now regarding the measures we use to reduce this problem: (i) catch and relocate (ii) shoot dead, we give licences to hunt wild boar (iii) sterilisation of monkeys as I said just now (iv) integrated operations between agencies, and after that, chase away by shooting. The Honourable Member for Sabak Bernam also asked about coastal erosion in the Sabak Bernam area. Mr Chairman, the Department of Environment has plans, but our problem concerns the allocation, which has not yet received approval. Nevertheless, the Drainage and Irrigation Department (JPS) will reapply for that allocation. Mr Chairman, I think that is as far as I can answer at this time, but for the Honourable Members whose questions I did not have time to answer, I will answer them in writing. Thank you.

Mr ChairmanEN

Honourable Members, the question is that the sum of RM916,924,000 for Head B.23 under the Ministry of Natural Resources and Environment, forming part of the Schedule, be agreed to. [Question put and agreed to] [The sum of RM916,924,000 for Head B.23 ordered to form part of the Schedule]

Mr ChairmanEN

The question is that the expenditure of RM1,413,471,300 for Head P.23 mentioned in the Development Estimates for 2011 be approved. [Question put and agreed to] [The sum of RM1,413,471,300 for Head P.23 approved to form part of the 2011 Development Estimates]

Bill — Supply Bill 2011 and Development Estimates Motion 2011 Committee — Head B.24 [Schedule] – Head P.24 [Development Estimates 2011] –Bill

Mr ChairmanEN

Supply Head B.24 and Development Head P.24 under the Ministry of International Trade and Industry are open for debate.

Mr ChairmanEN

The Honourable Member for Jasin, please.

Thank you, Mr Chairman, for giving me the opportunity to take part. Firstly, I note that the Ministry of International Trade and Industry was allocated for operating and development expenditure for 2011 totalling RM1.2 billion, compared with the operating and development allocation given for 2010 of RM2.8 billion. There is a difference of about RM1.6 billion. So I also want to ask whether this allocation is sufficient for our efforts in attracting

investment for this ministry. Next, I go to Details 090300 and Details 100800 of the Small and Medium Enterprise Corporation (SME Corp. Malaysia). The issue of slow processes for obtaining approval for financing, and the shortage of experts in SME Bank to assess financing applications, especially those involving small and medium enterprise companies, that is, SMEs, need immediate attention. This is because the failure to obtain financing from SME Bank, which we have raised in various places, should be seriously addressed, considering that it may affect the government's efforts to stimulate domestic investment.

In fact, this issue was raised at the National SME Development Council Meeting chaired personally by the Right Honourable Prime Minister. So, my question is whether the ministry intends to hold discussions with the top management of Bank Negara Malaysia as soon as possible so that we can address the financing issues, especially those involving small and medium enterprise companies. This is because most SME applications come from the middle and lower groups and are from the bumiputera community, especially from rural areas. Next, I would like to ask, what is the main reason these applications were rejected or were unsuccessful, and what form of guidance has been given by SME Bank so that we can help these entrepreneurs in preparing working papers? Next, what exactly is the total amount and percentage of loans that have been approved by race? This is because we find that only a group of entrepreneurs benefit from these loans. Next, has the total amount of these loans been fully disbursed up to now, or are we facing a shortage of allocation, and what is our strategy for 2011. Next, I go to Details 030500, the Free Trade Agreement (FTA) Negotiating Coordination Policy. As an export-oriented country, because this sector has contributed a great deal to the economic growth of the country. I would like to extend my highest congratulations on the government's efforts to continue to conclude many agreements with FTA trading partners from various countries. However, my question is, what exactly is the ministry's effort in realising the monitoring of compliance, or with permission, compliance obligations of the FTA by Malaysia and FTA trading partners, and we want to study what the actual effects and impacts would be of implementing this FTA on Malaysia. Secondly, what exactly are the results of the FTA negotiations with the EU, America, Australia, India, Japan and China. To what extent is the national interest being protected. Are the value of our exports and imports comparable and acceptable to foreign countries in the AFTA negotiations. Thirdly, I would like to ask what exactly is the total number of issues still outstanding and that cannot be agreed upon by, firstly, the United States, and the negotiations cannot continue. Is this issue related to security and also the welfare of the people, such as patents, food labelling of genetically modified foods, workers' rights and others. I would also like to request further explanation on the Malaysia-US FTA, namely regarding the five issues we often discuss, which are: (i) our farmers are not affected by the FTA, especially those related to rice and tobacco;

(ii) the people do not lose their jobs. This is actually an issue for foreign investors; (iii) the price of medicines does not rise sharply, the patent issue; (iv) the FTA will not give special status to American companies; and, (v) the basic facilities sector is always given protection. I suggest that the content of the discussions we have with America be announced, and that room be opened for public opinion, especially if possible we provide feedback at any meetings with industrial players or NGOs, so that we are able to protect the interests of the country. Next, I go to Details 050000 - Malaysian Industrial Development Authority (MIDA). This is actually an issue relating to the corporatisation of the Malaysian Industrial Development Authority (MIDA), which became the Investment Development Authority in the 2011 Budget tabled by the Right Honourable Prime Minister. So I want to ask to what extent the government is confident that our steps to corporatise MIDA, which we expect will bring success in our efforts to attract foreign investors. I would also like to ask what exactly was the value of the contribution of the manufacturing sector for the first quarter of 2010 compared with the same period in 2009. I would also like to ask what exactly was the value of the contribution of selected sectors for the first three quarters of 2009 compared with 2010, below. Since these questions should be presented to the government so that we can provide clear information, especially to the opposition who often criticise the government's efforts. The government has tried very hard to attract investment, but it has been belittled by the opposition. So I request that, if possible, the government provide details, especially on issues relating to transport equipment, and then on food manufacturing, industrial chemicals. After that, semiconductors and other electronic components, and also rubber-based products. I also request to ask the number of projects that we approved in 2009 and 2010 and when they were implemented? What exactly is the total number of jobs that will be created? We also want to request a breakdown by management category. After that, technical, supervisory and also skilled workers. We want, if possible, to provide details so that we can see to what extent these investors are providing employment opportunities to local children. In addition to FDI, which we indeed expected, and which has indeed declined compared with previous years because of the world economic crisis, we want to see the government give attention to DDI. This is because we, as Malaysians, are confident that we always pour out our wholehearted loyalty, and if possible we want to see the government always give attention, and whatever incentives we give to foreign investors, we should give the same incentives to local investors because they have proven they will not run away under any circumstances.

I request that, if possible, we provide details on the amount of DDI investment, its breakdown by basic metal products, electrical and electronics, and others. I also want to ask about the status and progress achieved in the government's committed efforts to carry out agricultural transformation to make it a modern and advanced sector, in our efforts to promote the country as an international halal hub, and the progress achieved by the Halal Hub Development Corporation. Is Malaysia also promoting the Malaysian halal standard as a benchmark for international standards for our halal products. For the first three years of 2010, what exactly was the total number of approved R&D projects and the investment value that we have approved under the pioneer status incentive, investment tax allowance, and we want, if possible, selected industries to be listed in the R&D approvals.

I mention this figure of investment because I read an article two days ago in an English-language newspaper. I do not know whether this figure is correct and whether the state government, the Honourable Chief Minister of the State, can provide details or announce the total investment up to August 2010. This news was published in a newspaper dated 23 November 2010. I request permission from Mr Chairman to read it out - it says, "Penang attracts RM2.53 billion investments up to August." As far as I know, usually the one who announces the total investments for each stage is the Honourable Minister of MITI. How could the Honourable Chief Minister of Penang mention this? Is this total correct or not? Or is this a political gimmick?

Tuan Jeff Ooi Chuan AunDAP · PRJelutong

Minta mencelah.

Sila.

Mr Chairman

Ya.

Tuan Jeff Ooi Chuan AunDAP · PRJelutongEN

What was actually said was figures that were published and also channelled through MITI to the state government. That's all.

Mr ChairmanEN

The Honourable Member for Jasin. Your time, time.

Habis?

Mr Chairman

Sila teruskan.

Last one. Since my time is up, I also cannot answer, let the Honourable Minister answer. But what I know...

Mr ChairmanEN

You may respond to the Honourable Minister, you may say so, Honourable Member.

Boleh ya?

Mr Chairman

Boleh, sila.

But what was said here, which I understand, is that the Honourable Minister of MITI will announce it only by stages. Perhaps the first phase or the second phase. But it was said here the first eight months, and after that it mentioned the state of Selangor as well. What relation is there

Penang with the state of Selangor? It makes a distinction between state and state. So that is why I want to ask the Honourable Minister, let the Honourable Minister answer whether it is proper or not for a state leader to announce the total investment of his state and also of other states? Thank you, Mr Chairman. I wish to support.

Mr ChairmanEN

Thank you. The Honourable Member for Lembah Pantai, please. Please.

Puan Nurul Izzah AnwarPKR · PHLembah PantaiEN

Thank you, Mr Chairman, for the opportunity for me to take part in the debate at the Committee of Supply stage on B.24. I will go straight to Item 030000 – International Trade and also Item 100200 – Investment and Trade Promotion Programme. I will not speak long. Referring to the World Investment Report 2010 issued by the United Nations. Although it has been mentioned many times, I think this issue is very, very important, and I request that the ministry give an open view on this proposal. Where the total foreign direct investment (FDI) recorded a sharp investment in 2009. Total FDI fell by RM19.04 billion compared with RM23.47 billion in 2008, which is rather embarrassing for Malaysia when compared with regional countries such as Thailand and Indonesia, which did not see their FDI shrink so badly. I think if Thailand lost RM14.24 billion, while Indonesia's was RM8.32 billion, that reflects a decline. However, in terms of total outflow, our figure also declined in 2009, where outward FDI was more than inward. This fall recorded the worst history in 15 years, and I think of course we are also aware that it has a long-term effect on foreign investors and their confidence, especially investors from regional countries – Asia itself. I request an explanation from the ministry on the main factors behind the shrinkage of FDI. I think earlier the Honourable Deputy Minister stated a reason which, in my view, is not reasonable, that criticism by the opposition about the weaknesses of the country has created fear among foreign investors. I am aware and I am confident that foreign investors are not so easily deceived by propaganda, thus proving the truth of such criticism. It is not merely our responsibility to inform the truth domestically, but it must also be in line with what we say abroad. In this borderless world, information can be obtained directly from the Hansard on the Parliament website. There is no need to wait for speeches in other countries. Foreign investors are more sophisticated, more complex and more sophisticated than us, with respect. So I request a more solid and rational answer. Perhaps do not be too emotional, because this is an important issue, and I think the level of the country's success in attracting FDI is a success shared together by opposition Members of Parliament. I only want to refer to the Citibank report in the monthly outlook, Mr Chairman. August 2010 – the most serious FDI shrinkage, perhaps I have already mentioned it, but the main issue raised is about the hourly wage in Malaysia for workers, which is roughly twice as high compared with China. We indeed have no other choice but to change the existing economic framework. We are no longer, and cannot continue to be, a low-wage economy, with respect, as described or explained by the NEAC previously, and we need to move towards a high-income nation.

Puan Nurul Izzah AnwarPKR · PHLembah PantaiEN

I just want to mention the NEAC report, the need to implement the New Economic Model, where the key is in building confidence, with respect. So I am very worried when this New Economic Model proposal… Part II should have been published together with the ETP announcement, which was postponed to 3 December this year. I think the ministry has a very important role to also examine, because earlier the IMD – World Competitiveness Yearbook report was mentioned. The Honourable Deputy Minister said that we are indeed good in the top ten. However, I feel there needs to be readiness to find the correlation between the IMD ranking and the reality of attracting or receiving foreign investment. This is because, for example, China is ranked only number 18, behind us, but its FDI attraction rate is better. So sometimes we cannot conclude whether success in the IMD is already sufficient; perhaps there is no correlation between FDI and IMD. I ask for an explanation on this matter. I was also intrigued by the statement of the Honourable Deputy Minister of International Trade and Industry (MITI), who wants to make Malaysia a base for products and raw materials before they are exported to other countries. I would like to ask, if it is true that the ministry is committed to implementing this system, which country is the main target, objective or model as the pioneer for the module introduced? What are the attractive factors that the ministry thinks Malaysia can implement to make us a successful product base? Apart from making Malaysia a product base in particular, what is the ministry's policy or strategy in efforts to increase Malaysia's FDI again? Also, specifically related – Mr Chairman, I will not be long. Specifically I still want to mention, what is the target timeframe for implementing the eight strategic initiatives for the New Economic Model? Among them are revitalising the private sector, building a quality workforce, moving towards transparent, market-friendly non-discriminatory policies based on merit and need, no longer based on skin colour. So what steps have been taken by the ministry to ensure that the NEAC recommendations are implemented, because we need a form of consistency and a good relationship or cooperation between the ministry's strategy, the government's strategy and the NEAC's proposals. That is all, thank you, Mr Chairman. That is all.

Mr ChairmanEN

Yes, Honourable Pasir Salak.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Thank you, Mr Chairman. I would like to refer to Item 020000 – Strategic Planning, namely to draw attention and at the same time to ask a question to the Honourable Minister. Does the strategic planning strategy take into account that – actually, as we move towards becoming a developed nation, we also cannot but emphasise the importance of the industrialised sector (industrialized sector). If we look at developed countries in the world, the first world economy, with respect, they are industrialised economies. So for Malaysia, I find that the restructuring of our economy places emphasis on the service sector. The service sector is emphasised and will be developed. Emphasis on the industrial sector seems to be considered important, but it is not publicised with such a high commitment.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

I am worried that we will become a consumer nation forever. If we continue to be a consumer nation, we will become a country that depends or is dependent on other countries' economies. If we want to buy military equipment, for example, we have to buy from other countries. If we want to buy transport equipment, we have to buy from other countries. So this is economically detrimental, where foreign exchange flows out of the country in large amounts. This is because demand for such products – industrialised products, intermediate products, with respect – is large. We must also become a producing nation at some point if we want to be a strong country economically. Another point about this strategic planning, I also want to ask the Honourable Minister, to what extent does our government give emphasis to equitable distribution of investment, with respect? This is because we see that most of the projects implemented by FDI or domestic investment, with respect, are concentrated in certain areas such as the Klang Valley, Pulau Pinang, or only in big towns. This is not very good for the country's economic growth. If we want to see this country become a developed nation, I think investment development projects, whether foreign or local, need to be brought to new areas in rural regions which currently are not short of basic infrastructure facilities, whether in terms of the supply of basic water and electricity needed by manufacturing, or in terms of good road transport. There is no problem with access to ports because transportation costs are not so high with good roads and highways of very high quality today. So, I think the government's strategic planning in industrial development needs to be brought to rural areas, where it will provide employment opportunities for rural residents. Today we see many young people, single mothers and also members of rural communities who are unemployed and have no jobs. Apart from that, some work only part-time or what is called semi-employed or under-employment, with respect. Their time is not fully used productively because there are no job opportunities. Moreover, not only is there no job opportunity – because there are no economic, manufacturing or industrial projects brought in, there are no spin-offs from such projects that provide opportunities for them to become entrepreneurs – small entrepreneurs, small traders. That is the side effect or what is called the multiplier effect, with respect, on rural communities. But this does not happen; it is only concentrated in the towns. From the government's side, it is also not very beneficial. From the political side it is also not beneficial, because those who live in the towns, no matter how much progress is brought, they seem not to appreciate it very much, not very – if I use the word 'grateful', the opposition gets angry – "Why must you ask the people whether they are grateful or not?" However, they should be grateful for what the government has done. So for that reason, I think rural residents are strong supporters of the government. Strong supporters of the government today and before, whom the opposition tried to shake with various methods. We know, they are our supporters and we need to win back their support with employment opportunities, business opportunities and so on.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Mr Chairman, apart from that, I would like to touch on the role of our international trade commissioners abroad. What is their role actually? Do not be beautiful only on paper – supposedly the international trade commissioners are to promote our trade abroad, promote products, attract investment, but in fact – to what extent has the government evaluated their performance and achievements in helping us to promote our products?

Datuk Abd. Rahman DahlanUMNO · BNKota Belud

[Bangun]

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

I would like to ask the Honourable Minister, why are our rural products, which can help the rural economy – we have many rural products. Do not underestimate, do not belittle, that rural areas do not have rural products. Perhaps there are no products...

Datuk Abd. Rahman DahlanUMNO · BNKota BeludEN

Honourable Pasir Salak.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Perhaps in terms of quality they need to be improved. That too we can do if we have planning and commitment in that regard. But unfortunately, wherever I see we go abroad – travelling or attending any event abroad, we do not look. We do not look.

Mr ChairmanEN

Honourable Pasir Salak, Honourable Kota Belud is standing behind.

Datuk Abd. Rahman DahlanUMNO · BNKota BeludEN

About the foreign trade commissioners just now.

Okey.

Datuk Abd. Rahman DahlanUMNO · BNKota BeludEN

Thank you Honourable Pasir Salak, thank you Mr Chairman. Honourable, I would like to ask for the Honourable Member's view on the quality of promotion carried out by the government at the World Expo in Shanghai. I once attended this expo, Mr Chairman, and I was very disappointed because the standard quality of trade promotion in the Malaysia Pavilion was very disappointing.

Datuk Abd. Rahman DahlanUMNO · BNKota BeludEN

Moreover, I ask the Honourable Member's view, as far as I know, the theme of the World Expo in Shanghai was "21st Century", with respect. What the countries that wanted to showcase their products about their country did was based on what might happen in the 21st century. But what happened at the Malaysia Pavilion, Honourable, was that we still showed, for example, how to make batik using a canting, not using robots or machines and so on, and many static exhibits, whereas other countries had exhibits with IT, digital and so on. So my question to the Honourable Member is, is this what the Honourable Member was worried about just now, about the role of MATRADE, MIDA, the Trade Commissioner, with respect, in these foreign countries, who are not helping the government in achieving the government's objective of promoting the government. Please explain, thank you.

Mr ChairmanEN

Honourable Pasir Salak, please respond briefly, Honourable, because time does not permit.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Yes, thank you Mr Chairman. I did not have the opportunity to go to the expo in China because I could not afford it [Laughter]. MITI did not even choose me to be sent there,

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

but never mind, that is my fate. Laughter] However, I am someone who is committed to the struggle....

Datuk Abd. Rahman DahlanUMNO · BNKota BeludEN

[Speaking without using the loudspeaker]

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Promotion, and I think I agree with the Honourable Member for Kota Kinabalu just now...

Datuk Abd. Rahman DahlanUMNO · BNKota Belud

Kota Belud.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Honourable Kota Belud, sorry, because at the back I cannot see the writing. So this is the problem, namely what our officers do, do not do it carelessly. I may – the Minister will be angry that this is mentioned, but we have to admit and accept, if you want to improve, with respect, our weaknesses. I went to New York,

[Speaking without using the loudspeaker]

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Went to New York first.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Menyampuk]

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

That New York trip was when the government was in power...

[Menyampuk]

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Chosen, chosen, Dato' Nazri sent [me]. [Laughter] The Minister in the Prime Minister's Department to attend the UNGA, so I went. However, I did not forget to bring my wife too. [Laughter] So I saw that when I visited the Trade Commissioner's office it was silent and lonely, there was nothing, nothing.

Datuk Abd. Rahman DahlanUMNO · BNKota BeludEN

There was nobody at all.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Nothing, and this is happening all over the place. If indeed they can challenge our arguments, what is the evidence of their success that they bring? Show the results of their work...

Datuk Abd. Rahman DahlanUMNO · BNKota Belud

KPI.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Where are the KPIs? And do not get angry if you are reprimanded like this, do not try to straighten a wet thread. I want to give this reminder, perhaps there will be an answer that I made a statement that is not pleasant to hear. I hope the Minister today, the new Minister of the Ministry of Domestic Trade, a leader who works hard, is committed, of high calibre and highly qualified, will surely be able to make a difference. This is what I hope for from our Trade Commissioners today, so that they really... If they are not qualified, return and replace them with others. Many other officers who can, can be trained and given training first, do not just send them off. The KPIs must be there. We talk about KPIs, NKRA, but do not just put them on paper. The Minister's NKRAs are good, the achievements are high, the KPIs are fulfilled, but what about the officers? What kind of officers? I want to ask, what kind of officers? A Minister cannot do a job alone; he needs support from officers. This is the question, I apologise – perhaps because I was not taken to China. [Laughter]

Mr ChairmanEN

The question, Honourable Pasir Salak, the question is time.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

The question is time, so I will end with one more, Mr Chairman, if possible, one more, if there is interest, for example, opportunities for entrepreneurs, businesspeople and especially us, who are just learning to walk and crawl, namely the bumiputera community. They do not get to America, Europe, Japan and Korea. They do not know the opportunities of agencies, franchises from those countries. Manufacturers from those countries, they do not know, and even if they know, they cannot get there, there is no connection, there is no capability, how do we give them the opportunity to obtain business, franchises, international agencies, which we can see in shopping complexes, in many trade centres, monopolised by the same towkays, rich people, big companies, from the past until now. Where is the opportunity for new entrepreneurs? Why not MITI? MITI should take the role of finding manufacturers, producers and holding a match-making exercise to help so that there are new opportunities. If there is a car franchise agency, for example, do not just go to that same company, back to that same company. I do not want to mention the name of that company here, back to that same towkay. Why are there no other new towkays who can be educated, developed and obtain franchises, agency importation rights, assembly rights, distribution rights, all the rights, why is this not happening?

[Speaking without using the loudspeaker]

Sudah lama, it is all alright. It is not all right.

Mr ChairmanEN

Honourable Pasir Salak, other MPs also have the right to speak.

Siapa?

Mr Chairman

Masa.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

I will wind up. I place high hopes on the new Minister. If there is no change, we are saddened. When again, which other Minister can we hope for...

Honourable Pasir Salak, perhaps.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

Which other Minister can we hope for? Past achievements have been like that.

[Speaking without using the loudspeaker]

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

That is the achievement: when we reprimand, when we give opinions, wah! Brushed aside! As if we are stupid, do not know how to speak, do not know how, do not understand in terms of policy, planning, business. This is what makes me angry. For example, in terms of the car AP.

Mr ChairmanEN

Honourable Pasir Salak, do not let me get angry too.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

No. [Laughter] Mr Chairman, do not get angry with me, I am sitting...

Mr Chairman

Itulah itu.

[Ketawa]

Mr Chairman

You’re also brushed aside my comments.

Ya...

Mr Chairman

Terima kasih.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

As for that, I will excuse it. Ask the Minister to do something innovative and creative, as the Prime Minister mentioned. New strategy, new thinking, think out of the box. Bold, being bold, bold, where is the bold.

Mr Chairman

[Ketawa]

Think big, where is the big?

Mr ChairmanEN

Honourable Pasir Salak, 'bald ball' or bold.

Dato’ Haji Tajuddin Abdul RahmanUMNO · BNPasir SalakEN

That is all, thank you. [Laughter]

You seem to be just wanting to taunt the Minister.

Mr ChairmanEN

Please, Honourable Indera Mahkota.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Thank you, Mr Chairman, and thank you also to Honourable Pasir Salak for being amused.

[Speaking without using the microphone]

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Thank you. I too will not take much time. I will try to take a brief time for a few matters that I consider important. First, regarding the items under Supply Purpose 30200, namely Economic and Trade Relations, which in turn leads to the Simple Secretariat Impact as in 30600. Mr Chairman, we understand that in the latest or final negotiations that reached consensus, several agreements have been finalised, and among them mentioned a few days ago, and reports say that negotiations to avoid double taxation, namely the Double Taxation Agreement, with permission, have been finalised, including those delayed for several years, such as the agreement with the United States of America and also with China, which have been delayed for so long. I want to know the developments in detail: what areas we have managed to finalise.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

This is because there is no exclusivity, with permission, for the whole of those double taxation promotion agreements, which also means that recently, the ministry under the Prime Minister proposed in the budget a few weeks ago that 300 import tax items be abolished immediately. I have previously asked the ministry how much the estimated loss of revenue or reduction in revenue would be if we exempt import duties on 300 types of goods. I received a written reply saying it would be only RM240 million. This means the estimated amount is only 0.22%, not even half a per cent of total import duties, RM2.1 billion. Can this estimate be said to have been carefully made? I am worried because the position of our import duties also puts pressure on efforts to increase national revenue through the taxation system, whether direct or indirect. I happened to get access to read a recent report on countries around ASEAN that are competing to attract foreign investment by offering tax exemption facilities, including import taxes and duties. At the same time, our country has proposed and also implemented many incentives that seem as if we want to

Tuan Azan IsmailPKR · PRIndera MahkotaEN

provide free services to foreign investors. What is important in my view for us to consider together is that we have long offered or provided tax investment allowances. I want to ask, up until now, what is the value or estimated value that we have offered to foreign investors in the form of tax investment allowances, because we have given them at least for the last five years. Because we are facing the FDI problem as mentioned by Honourable Lembah Pantai and our other colleagues, I want to know what amount we estimate we have given to foreign investors. Because they are seen as not appreciative, as Honourable Pasir Salak said, even though they have been given those services or good treatment, they still leave and are not interested in coming to invest in our country, especially in the last two or three years. Apart from that, the reinvestment allowance, which is indeed the highest interest of foreign investors in entering a country. This is because this reinvestment allowance can be averaged over a period of up to 10 years. We have indeed offered this to them. The reinvestment allowance can be distributed over accounting periods so that they seem not to need to pay direct tax at all. This is because the offset or deduction from the reinvestment tax allowance, and they are quite expert in distributing it by quarter respectively so that the tax they pay is almost minimal. Apart from that, what they also like is the capital allowance, or the way they examine the angle, where the capital allowance can also reduce the tax they should pay or that is imposed on them. We have one more that we are offering now, the services plant allowance, which also touches on investment in the green industry sector to promote measures to enhance industries related to the green industry, national policy. I also want to know, what is our estimate for 2011 that we offered or that was grabbed or obtained by these foreign investors? The last allowance, which is also very much liked by foreign investors, is the transfer of technology allowance, with permission, where the calculation at this time is that we open it and allow it based on a report recorded by them, sent to the relevant ministry. We are not tightening in terms of the chronological description of this report because we want to encourage investment participation in this technology transfer. I want to ask, what are the latest developments? Even if there are no statistics, it does not matter. What are the methods or latest developments in handling the allowances that we have offered to foreign investors? Because the problems of FDI and DDI are considered two main problems that worry us because of the decline. Whatever reports there are, that is not important, but what is important is that this problem is a real one. This is a real situation, with permission. We ourselves admit that we are facing a trap. Our country is facing the problem of the middle and low income trap. This is indeed a main worry. I also share that worry because the government has worked hard to provide understanding about the ETP, GTP, NKRA and so on. Indeed, this implies, indeed we recognise that this is the problem we are facing now and we want to try to correct it. I, on behalf of my colleagues on this side, also strive. Insya-Allah, we have no intention to worsen the situation, but we together share this position, beginning with the government already recognising the problem, and I hope this is among the matters given serious attention

Tuan Azan IsmailPKR · PRIndera MahkotaEN

not just to answer by saying we are the ones being wronged and so on, or for example, saying the Leader of the Opposition alone succeeded in destroying the foreign investment that should have come in. That is not reasonable at all, and that does not bring any benefit or solve any problem. So, I hope that matter becomes the focus this time. Under the same heading, the same matter, I want to ask the ministry, what steps are proposed to be taken after this? Because we have let go of a rather golden opportunity, we became the main leader among the early initiatives pioneering the way to develop Islamic banking products or Islamic financial products that we pioneered. We are among the countries that pioneered these products, including the aim of encouraging foreign investors in banking to enter our country. We liberalised our financial subsector, most concentrated on Islamic finance or Islamic banking products. But unfortunately today, Mr Chairman, the United Kingdom has seized this opportunity and succeeded in seizing this opportunity to become the first country at the top in terms of exploiting and leading transactions of an Islamic financial or Islamic banking nature. Followed by our neighbour Singapore, Taiwan, Korea, and I do not know Malaysia's position, which number, I do not know. Perhaps the Honourable Minister has this data. I want to ask, since we have missed this golden opportunity, is there a plan for us to restore this situation? I feel it is not fair because we are among the countries that pioneered this product, and in the end we have fallen behind and become just followers. It is not reasonable at all, and I think I am not exaggerating if I say that as a Member of Parliament, even though I am on the opposition side, I feel ashamed. I feel ashamed because this is our product. We should be able to dominate. Once again, because the former Chairman of the OIC is still in the House, I intend that we make efforts to improve Malaysia's position from some unknown number, at least we are among the highest on the chart, as people say, respecting the chair that was once recognised, Malaysia as chairman of Islamic countries, and we try to climb this ladder to the top, if possible, or some of the top, because from the perspective of its status, there are also good ones.

Tuan Azan IsmailPKR · PRIndera MahkotaEN

Second, because we are struggling with the FDI problem or the domestic growth problem which is also a concern for us, I think we should not let this opportunity go, Mr Chairman, because the latest valuation contributed by this product exceeds USD2 trillion. This is the latest report in the FORBES magazine. We want to hold an exhibition, actually a seminar, which we proposed in this budget under Item 100300, Mr Chairman. Under Item 100300, we have a proposal to organise the FORBES Global CEO Conference 2011 – it is in the ministry's proposal. However, should we not take into account this opportunity, which, by the look of it, if we let it be, we will miss out. I am very interested to know from the Honourable Minister, what are our proposals for the nearest term or the coming few years? Last year we proposed and we together approved several incentives that are very good regarding our proposal to give exemption on the issuance of bonds or sukuk of Islamic financial nature. Last year too we have

Tuan Azan IsmailPKR · PRIndera MahkotaEN

amended several acts involving the Labuan Offshore Financial Services Act. There are six acts that we have passed for the specific purpose of encouraging sukuk investment in our country. But we have failed – sorry, I do not want to use the word failed. But we do not see any improvement that should have come with the offers we gave, the facilities and so on that were welcomed by outside investors into our country, which is important for the benefit our country gains. In my view, this is a variable I cannot find. Where exactly is the missing link between these matters? Surely the Honourable Minister knows better, and therefore, I ask for an explanation so that at least I can gain knowledge to share with all colleagues so that this matter does not become a very complicated question for us to examine together in the future. Last matter, Mr Chairman. I hope the role of MIDA under Item 050000, with several new allocations, including this year and last year, which if combined exceed RM400 million that we have given. Surely today or tomorrow, I would like to hear some of the latest comments regarding MIDA. What new strategy is to be played? Thank you very much, Mr Chairman.

[Bangun]

Mr Chairman

Sila.

Thank you, Mr Chairman. First, I would like to also participate in debating Item 080000 – the Small and Medium Enterprise Corporation Malaysia (SME Corp. Malaysia). Second, I congratulate the Honourable Minister and Deputy Minister who have diligently worked to uplift trade and industry, especially in our country, to achieve the aim of increasing GDP (KDNK) in our country. Mr Chairman, I would like to know, what package can stimulate exports of small and medium enterprises (PKS) that penetrate new markets to continue the momentum of positive trade growth? Has MITI (Ministry of International Trade and Industry) identified rural entrepreneurs who are capable of exporting their products to the international level? If we look today, many entrepreneurs in our country, especially those in rural areas, have their products. We can also see that these small entrepreneurs also have the desire to compete at the international level. Perhaps originally on a small scale with loans that have already been given, and eventually, these entrepreneurs have succeeded. However, perhaps to achieve space for them to compete at the international level is something they cannot own. I hope MITI can give focus so that we can produce many entrepreneurs, especially those in rural areas, to be uplifted – and I am also very confident they are indeed capable. However, that path must be helped by us with certain briefings or meetings. We can also see – as I said earlier, that our products are indeed very plentiful and very good, but the exposures

as motivation or stimulation for these PKS entrepreneurs in rural areas. I would like to ask, to what extent is MITI making efforts to expedite the current free trade agreement (FTA) negotiations and reduce non-tariff barriers to ensure that this goal will be achieved? This is important because at this time, the slow recovery in the global economy may affect Malaysia's trade performance in line with many other countries. Therefore, I am of the view that – trade is also expected to slow, but markets continue to grow and should be expanded. To maintain steady trade growth, I would like to ask how much MITI's focus is on rural areas that can help increase GDP (KDNK) in our country? I have been informed that Malaysia's total trade this year is expected to increase by 18% to approximately RM1.16 trillion. This figure is the same as that recorded two years ago. This projection is based on total trade showing good expansion for the first nine months of this year. So I would also like to know, how are the schemes to improve training for PKS, especially those in rural areas, along with the promotion fund to help PKS better? This is because, as I said earlier, the hope of rural communities, especially these small entrepreneurs, is that they indeed want to improve their income and also their products, which they have, not merely to be sold within our country, but they are also very interested in being able to compete at the international level and so on. I also want to ask, how does MATRADE identify credible PKS entrepreneurs? Does MITI itself have a database for PKS entrepreneurs, especially in ensuring that our local entrepreneurs are able to compete at the international level? I suggest that MITI should complete the data that exists in our country. Our entrepreneurs can be gathered and they can be exposed to exposures so that there is spirit or stimulation for them to improve their products.

However, basically all this information must be conveyed as clearly as possible to them, and I am sure and believe that MITI's capacity to uplift PKS, especially those in rural areas in our country, can indeed be planned, and Insya-Allah, I am sure and believe that this effort will also complement income, especially for those in rural areas, and we will also feel proud of our products that will be found throughout the length and breadth of our country. So Mr Chairman, thank you.

Mr ChairmanEN

Yes, please, Bandar Kuching.

Tuan Chong Cheing JenDAP · PHBandar KuchingEN

Thank you, Mr Chairman. I would like to refer to Item 050000 - Malaysian Industrial Development Authority (MIDA). We all know the report from the World Investment Report 2010 that our country's FDI has fallen by 81% from RM23.47 billion in 2008 to RM4.43 billion in 2009.

Tuan Chong Cheing JenDAP · PHBandar KuchingEN

However, I have one question. I want to know how that figure was obtained, because I read in a newspaper report that in 2009, FDI to Sarawak alone reached RM5.9 billion. So I would like to know whether there is any difference between the figure given by the Honourable Deputy Minister of International Trade and Industry (MITI) and the figure in the World Investment Report 2010, which says that FDI for Malaysia as a whole in 2009 was only RM4.43 billion, yet for Sarawak alone we reached RM5.9 billion. That is my first question. The second issue I want to raise is that Sarawak has been attracting the largest FDI in our country for several consecutive years now. I am somewhat concerned about this trend, because the FDI coming into Sarawak is for investment in aluminium smelting plants and silicon smelting plants only, and we have read many reports that the smelting plant industry has brought pollution to our environment. This year, in October, we read from Hungary about a leak that occurred at an aluminium smelting plant in Hungary, in which a village was destroyed, and the toxic waste released from that aluminium smelting plant will seriously harm their people over the long term. I would like to know what precautionary measures have been introduced for investors who come to Sarawak to invest in building aluminium smelting plants. I would also like to quote a report from Hornbill Unleashed, which was reported this November: "Since September 2009, 27 native family living in Rumah Bangsang long house in Sungai Belenggang here have been suffering for a mysterious illness which they believed of originating from aluminium smelting plant about 300 meter from their home. Explaining the mysterious illness, Tuai Rumah Bangsang said the community has been experiencing all sorts of health problems such as breeding, difficulty coughing as skin diseases since the construction of the smelting plan. The air here now has a stinking smell and the rain water which we collect and use for drinking is turning black. The environment is also suffering, all the fish in near by rivers and pond are gone, paddy and fruit trees cannot bear fruits and our vegetable cannot grow. Evenly surrounding secondary forests are dying and the smelting plant is silent killer". Was an environmental impact study carried out before the aluminium smelting plant was built at that location? It is not only one aluminium smelting plant in Sarawak; it is from press matter, and now the company Rio Tinto will work together with CMS to build another, even larger aluminium smelting plant in Sarawak at SCORE, and it is a significant FDI figure. Therefore, I am worried whether the government is only focusing on figures, statistics, GDP and FDI figures, and has turned a blind eye to the environmental impact on the people of Sarawak. The government simply invites them in to invest, and Rio Tinto, which has now negotiated for lower electricity tariffs, has a track record that is not very good this year, and there is a report that its employees were convicted in a court in China for bribery, and that is what was reported. "Rio Tinto was not charged in court but is announcing it's verdict Monday the court is essentially excuse the company of using stolen information to harm Chinese economy interest causing Chinese steel mills and additional USD150 millions last a year a long.

Tuan Chong Cheing JenDAP · PHBandar KuchingEN

Therefore, it seems that the foreign investor, namely Rio Tinto, does not really have a genuine intention to develop and help our country, but is merely profit-oriented. So I would like to know whether a study, or a survey, has been carried out on the environmental impact of the smelting plant that is to be built in Sarawak. Secondly, what effect will our country experience, because what is being discussed now between Rio Tinto and CMS with SESCO Sdn. Bhd., Sarawak's electricity supplier, is an arrangement to attract them to come in and invest in building the smelting plant. The electricity tariff given to them is extremely low, at about 10 sen per unit only. Whereas domestic industries in Sarawak are now paying 30 sen per unit. What is so special about the joint venture between Rio Tinto and CMS that they can enjoy electricity at such a cheap rate, 10 sen per unit?

Tuan Chong Cheing JenDAP · PHBandar KuchingEN

However, domestic tariff consumers in Sarawak pay about 30% sen per unit. Industries in Sarawak are also paying 30 sen per unit now. Therefore, I hope the government will not only want good GDP and FDI figures while neglecting what our own people have experienced. If the government can give or sell electricity to Rio Tinto or the Aluminium Smelting Plant at such a low price, it is not impossible for SESCO to also supply electricity to domestic industries and local industries at the same price, so that our own industries can enjoy cheaper electricity and obtain even higher profits. Therefore, I will conclude. The last point concerns the Cabotage Policy, under which foreign ships are not allowed to enter ports in Sarawak or in other states. They may only go to Port Klang. When will the government implement this policy? This is because it has contributed to higher prices of goods in Sabah and Sarawak, and it has increased transport costs. That is all, thank you.

Mr ChairmanEN

Thank you. The House resumed sitting. [Mr Speaker in the Chair]

Mr SpeakerEN

Honourable Members, the House is adjourned until 10.00 a.m. on Thursday, 25 November 2010. The House was adjourned at 7.32 p.m.