(Opening)
[Mr Speaker presided over the Sitting]
Oral Answers to QuestionsQuestions
[Question No. 1 – Y.B. Datuk Shabudin bin Yahaya (Tasek Gelugor) not present]
2. Mr Sim Tong Him [Kota Melaka] asked the Minister of Natural Resources and Environment to state the area of the land reclamation project sites that have been approved by the Ministry for the state of Melaka. Do all these land reclamation projects have EIA studies, and do these studies include the impacts on the Benthic Ecosystem?
Thank you Mr Speaker. For the information of the Honourable Member for Kota Melaka, the area of the land reclamation project sites that have been approved by the Ministry of Natural Resources and Environment for the state of Melaka is 2,835 hectares. Through the macro environmental impact assessment, or macro EIA. The macro study for the proposed sea reclamation in Melaka involves several proposed projects and their impacts are seen comprehensively. However, based on monitoring carried out, it was found that only some of the proposed projects stated in the macro EIA study were implemented. For the information of the Honourable Member for Kota Melaka, there are also land reclamation projects in Melaka that have carried out individual EIA studies, including hydraulic studies that must be approved by the Department of Environment and the Department of Irrigation and Drainage before sea reclamation and redevelopment works. The study of the impact on the Benthic Ecosystem is part of the critical EIA study that must be carried out by any proposed land reclamation project. That is all, thank you.
Thank you Mr Speaker and also thank you to the Honourable Minister. Honourable Minister, I agree that this project is still being implemented. I would like to ask the Honourable Minister, so far how much area or estimated area has been reclaimed from the sea, that is the site, how many proposals and how many contractors are involved? However, so far how much has been reclaimed from the sea and how is monitoring or enforcement carried out? I would also like to ask, what about the illegal sale of sea sand that has been extracted from this land reclamation process? What about enforcement? Thank you Honourable Minister.
Thank you Honourable Member for the supplementary question. This project falls under the state government, under the State Economic Planning Unit (UPEN). Even so, enforcement is carried out by the Department of Environment.
The Department of Environment has, in its enforcement, found that developers did not follow the conditions. When they did not follow the conditions, a stop work order was also issued to the project developers so that they must comply with the conditions of the EIA approval there. As to how large an area has been developed, I am not certain, because our ministry did not receive information from the state government on how much is currently being developed. Even so, reclamation activities carried out without following the conditions of the EIA report, the project developer did not obtain approval of the EIA report. In this project, because development work has not yet been carried out, when the macro EIA report was assessed, a stop work order was issued to the developer so that they do not continue development projects that do not comply with the EIA conditions. That is all, thank you.
[Bangun]
Honourable Parit Sulong. It is certainly visible today. [Laughter]
Baju merah.
It is about wearing that red shirt.
Thank you Mr Speaker, I noticed Mr Speaker wearing a red tie this morning.
[Dewan riuh]
So that I am noticed, because the red is visible. Sometimes Honourable Members do not see Mr Speaker sitting up there. [Laughter]
I will go straight to my second supplementary question. So I would like to ask the Honourable Deputy Minister, what are the conditions and guidelines determined by the Ministry, when the Ministry approves any land reclamation project, so that the developers who apply follow the stated guidelines? Thank you.
Thank you Honourable Member from Parit Sulong. For this project, in Melaka there are 25 approval conditions, but the guidelines for conducting the EIA are discussed when the terms of reference and scope of the EIA are presented to the Department of Environment. However, for reclamation projects, what is most important is the hydraulic study. A comprehensive hydraulic study. This is indeed related to the aquatic ecosystem, including as asked by our friend from the Honourable Member for Kota Melaka, namely the benthic zone, Honourable Member. Because the benthic zone is closer to the coastline, but the benthos, or these marine creatures, are under the sea water. So, this is what should be the guideline to ensure that the benthic zone is not damaged so that these creatures will continue to live there because they are among the species that become seafood too, which we can eat. Therefore, these two guidelines are the most important, the first, which I have just mentioned, is a detailed hydraulic study, and the second, the aquatic ecosystem, to see whether marine life there will become extinct later, or be damaged. Thank you.
Mr Speaker.
Sila.
Thank you Mr Speaker. Since the land falls under the jurisdiction of the state government, what is the role of the state government in the approval process for this land reclamation, Honourable Deputy Minister. Thank you.
The jurisdiction of the state government is to approve development of this kind. Therefore this is the responsibility of the jurisdiction
of the state government. The jurisdiction of the Federal Government is to ensure certain conditions for sensitive development such as this, because this development is at sea, reclamation at the coastline is indeed sensitive. Therefore, an EIA must certainly be carried out, and the detailed study I mentioned earlier, namely the hydraulic study, must also be carried out. If not, later a disaster will occur, a landslide has already occurred in the Melaka River because of this project. Therefore, the Department of Environment Melaka has had to issue a stop-work order, so that all these conditions in the EIA approval are followed by the developers. We do not want sediment to occur in the Melaka River. Later it will no longer attract tourists who visit Melaka. That is all, thank you.
3. Datuk Wira Haji Ahmad bin Hamzah [Jasin] asked the Minister of Domestic Trade, Cooperatives and Consumerism to state: (a) the steps to create a comprehensive business environment based on competition law; and (b) how the Ministry views cartel practices, monopolies and collusion in setting prices, which lead to a free market without control and consumers being denied fairer protection.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace and 1Malaysia greetings. Thank you Mr Speaker and thank you to my friend the Honourable Member for Jasin. To answer the question: (a) The introduction of the Competition Act 2010, known as AP 2010 in Malaysia, is a positive step towards the country achieving developed nation status, and also an important step in encouraging the economic transformation of the country on the global economic stage, where enterprises compete to earn maximum profits. Only the effective enforcement of Competition Law will ensure that the free market process and liberalisation being vigorously carried out in the country at present are protected and not affected by negative elements such as cartels to set market prices or the abuse of the dominant power that may be held by an enterprise. The Competition Act is also a form of substantive legislation to regulate commercial business practices in which anti-competitive agreements and the abuse of power in the market are prohibited. Meanwhile, the Competition Commission Act 2010 is an Act that provides powers for the establishment of the Malaysia Competition Commission (MyCC) as well as the source of authority in implementing and also enforcing the Competition Act 2010. (b) Honourable Member, in the era of globalisation, world markets including the market in Malaysia are generally moving towards the concept of a free market without borders. As a result of this free market, the supply and demand for goods and services will determine their own balance in setting prices. However, as a result of the imperfections of this free market, there are some
industry players who take advantage by manipulating the market to gain unreasonable profits. Therefore, the Competition Act 2010 was introduced to take action if market manipulation occurs. The Competition Act 2010 emphasises the importance of industry players competing and moving forward based on the principles of efficiency, and not based on market manipulation, abuse of dominant market position, and control over resources and market chains that oppress and burden competitors and consumers in general. Thank you.
Thank you Mr Speaker, thank you Honourable Deputy Minister. Before this, I would like to welcome our friends from JKK Bukit Gantang, Perak. [Applause] Mr Speaker, it is our important duty to protect the interests of consumers so as to obtain as many quality goods and services as possible and at reasonable prices. Accordingly, at the same time, we are also bound by legislation such as the Competition Act and in line with all regional and international agreements such as our regional and international agreements - AFTA, GATS and also WTO, which in fact provide freedom for all ASEAN domestic products to enter our country without tariffs, but at the same time, we also have to protect the interests of local goods producers who are now competing and taking their first steps, and it is impossible for them to compete with giant markets.
At the same time, it is the government's duty to be able to control and also provide protectionism so that not all goods can be imported. So my question, given this matter, what exactly is the government's action to balance these two matters which are the demands and needs in the market. Furthermore, I would like to ask the Minister, does the government intend to establish a Price Control Commission so that we can ensure that any demands from consumers and suppliers can be addressed together. At the same time, does the government want to create a buffer stock in an effort to ensure that essential goods are always sufficient. Thank you Mr Speaker.
Thank you Honourable Member, a supplementary question on the interests of consumers. It is indeed the government's aim to prioritise the interests of consumers over the interests of entrepreneurs or traders. We also take note of both, because what is important to us is that these traders do not take the opportunity to do something. Setting inappropriate prices on consumers. So for that, we are confident in the Competition Act 2010 and also the Competition Commission Act that we have, for us to take an approach towards all companies so that they do not practise, so that the interests of consumers must be put first. So for that, for example Honourable Member, in our implementation of control under the Competition Act, there are actions that we have taken. For the information of the Honourable Member also, because this Act is a relatively new Act, as the Competition Act came into operation in 2010. We enforced it on 1 January 2012. Within a period of two years, that is from 2012 to 2013, we believe that this Act is still new and it is necessary for us to provide explanation and clarification to everyone, especially traders, regarding the existence of this Act. Because to ensure that price control and also perhaps they want to
take advantage of price increases and so on in order to set or give prices beyond what should happen. So we believe through the existing Act and we may for the time being not intend to establish a Price Control Commission and also buffer stock, because we are confident that the Competition Act 2010 and the Competition Commission Act 2010 are sufficient for the time being. Thank you.
Thank you Mr Speaker and thank you Honourable Deputy Minister. The role played by this Act is very important. We now have the Competition Commission in Malaysia. It is involved with competition, liberalisation and so on. This process is very important as it will bring balance to consumers in this country. Is the government satisfied so far? It is almost two years since the commissioner began playing their role. What is the government's regulation so that it plays the role it was established for, and especially where I understand there is no control over the granting of government contracts, where government contracts are now not hands on, not... but are between a private dealing. Where there is no direct competition and traders are unable to play a role so that the prices offered by contractors are not much lower than what has been agreed. So what is the role played by the government in regulating this commissioner. Thank you.
Thank you Honourable Member. Supplementary question. We are confident and we believe through the Act I mentioned earlier, it includes regulating prices set by companies. So whether through the process of this Competition Act, as in the example I mentioned earlier, up to today we have taken action or given warnings to the companies involved. For example, recently MAS and also AirAsia, where we found that they were holding discussions and agreements between them on prices and so on. That too, action has been taken. First was regarding the increase in airfares. They had discussed increasing it by 10%.
Kontrak-kontrak kerajaan?
There are no government contracts so far. However, we will give attention if there are any. For example in transportation. We have taken action because there were discussions to increase transportation costs between states. That too, we have already taken action. Lastly is Megasteel. That is also because they had discussions to increase the price of supplies and also they planned not to supply steel to small companies but to big contractors. All of this is under our observation. For this reason we obtain this information for the Honourable Member through either complaints from consumers or our own initiative, so that through this Act, we can take action and also possibly other directives that we will take and conduct investigations from time to time. This is so that any actions taken, whether in transportation or manufacturing, that intend to arbitrarily raise prices will be acted upon and further investigated. Thank you.
4. Mr Mohd. Rafizi bin Ramli [Pandan] asked the Prime Minister to state the reasons why the leave for civil servants to perform the Hajj is limited to only 40 days, whereas the period for performing the Hajj under the management of Tabung Haji can reach 45 days. Does the government intend to harmonise Hajj leave up to a maximum of 50 days in line with the period of Hajj managed by Tabung Haji.
Bismillahi Rahmani Rahim. Thank you. Mr Speaker, for the information of the Honourable Members, Hajj leave facilities are a provision of full-pay leave
given to public servants who are Muslim for the purpose of performing the obligatory Hajj. The Hajj leave facility with a maximum period of 40 days provided already covers a reasonable period, namely consisting of the period for performing the obligatory Hajj in Mecca, the preparation period before departure and the rest period after returning. Any period exceeding the 40 days provided, the officer must use rest leave or any leave facilities for which the officer is eligible. This is in line with the decision of the Cabinet Committee on Public Sector Employee Salaries Meeting on 7 September 1983. The 40-day period for the Hajj leave facility is based on 30 days for performing the obligatory Hajj, as well as a five-day preparation period before departure and five days of rest period after returning or still being there. For example, if the officer's flight period is 20 days, then the minimum period the officer may be given Hajj leave is 30 days. If the officer's flight period is 30 days, then the officer is eligible for 40 days of leave. Meanwhile, if the officer's flight period is 40 days, then the Hajj leave eligible is also 40 days. The maximum total period of Hajj leave that can be given to an officer is only 40 days. This matter has been discussed many times. Although the last meeting with the National Joint Council was on 25 April 1994, the period given is still sufficient.
Oleh yang demikian, kemudahan cuti haji sedia ada adalah memadai dan dasar sedia ada dikekalkan. Didapati bahawa tempoh urusan berkaitan haji yang melebihi tempoh 40 hari berlaku berikutan jadual penerbangan yang ditetapkan oleh syarikat penerbangan adalah bergantung kepada jenis-jenis kapal terbang termasuklah yang disewa dan bilangan jemaah haji yang semakin bertambah di mana perkara ini masih dikawal selia oleh Tabung Haji Board (Lembaga Tabung Haji). Dalam menunaikan haji, seseorang itu perlu melalui proses rukun haji dan wajib haji. Rukun haji hendaklah ditunaikan. Sekiranya tidak dilakukan ianya adalah tidak sah. Bagi wajib haji sekiranya ditinggalkan ia adalah berdosa namun hajinya sah tetapi perlu membayar dam.
Terima kasih Yang Berhormat Menteri, Tuan Yang di-Pertua dan Dewan. Keupayaan Tabung Haji mengelolakan urusan ibadah haji dengan baik ini bergantung kepada kekukuhan kewangannya. Tabung Haji ada membuat beberapa pelaburan yang mencecah RM100 juta dengan sebuah syarikat yang bernama Silver Bird Group Berhad yang baru-baru ini pegawai-pegawai kanannya telah dihadapkan ke mahkamah atas tuduhan menyeleweng dana FELDA melalui skim pelaburan yang hampir sama dengan apa yang dimeterai dengan Tabung Haji. Jadi soalan saya kepada Yang Berhormat Menteri apakah asas-asas yang mendorong Tabung Haji memeterai perjanjian pelaburan-pelaburan ini? Apakah prestasi setakat ini? Kenapa melabur di dalam syarikat yang diragui integritinya yang mana pegawai-pegawai kanan syarikat itu telah pun dihadapkan ke mahkamah kerana menyeleweng dana?
Tuan Yang di-Pertua, saya akan menjawab kerana soalan ini tidak berkenaan dengan... Tuan Yang di-Pertua, soalan ini adalah berlainan daripada soalan asal yang ditanya, jadi saya menjawab ini bagi pihak Public Service Department (JPA). Akan tetapi kalau haji kena menteri haji yang menjawab. Jadi saya akan sampaikan maklumat ini kepada Menteri haji untuk menjawab.
Terima kasih Tuan Yang di-Pertua. Terima kasih Yang Berhormat Menteri. Pertamanya saya suka merakamkan setinggi-tinggi terima kasih bagi pihak kerajaan kerana telah memberi banyak faedah dan kebaikan kepada kakitangan kerajaan terutama sekali dalam bab haji ini. Justeru itu berkaitan dengan perkara ini, suka saya menarik perhatian minta pihak Yang Berhormat Menteri juga berbincang membawa kepada pengetahuan Ministry of Human Resources agar perkara yang sama dipanjangkan juga kepada pekerja-pekerja swasta. Ini kerana pekerja swasta ini kalau hendak mengerjakan haji kami menggunakan cuti sendiri. Kalau tidak ada cuti sendiri maknanya kami akan menunaikan haji dalam keadaan cuti tanpa gaji. Ada juga syarikat swasta tidak membenarkan dan mereka tidak dapat menunaikan rukun haji ini.
Saya juga ingin menyambung untuk bertanya adakah kerajaan bercadang untuk mewujudkan sebuah dasar bagi memperuntukkan cuti khas kepada penjawat awam yang ingin melaksanakan aktiviti-aktiviti keagamaan yang tertentu? Itu sahaja. Terima kasih.
Tuan Yang di-Pertua, kerajaan menyokong dan menggalakkan pihak swasta untuk memberi cuti haji tetapi pihak swasta itu kena faham bahawa haji ini kita tidak perlu tempoh 40 hari dan 40 hari ini ialah keistimewaan yang luar biasa yang diberikan oleh kerajaan kepada kaki tangannya. Akan tetapi kita kena maklum bahawa kaki tangan kerajaan ada sejuta lebih jadi ada kemampuan untuk menggantikan tempat jikalau sekiranya orang itu pergi bercuti. Akan tetapi saya tahu swasta ini ada yang kecil dan ada yang besar mengikut kemampuan. Walau bagaimanapun untuk seseorang itu menunaikan haji, dia hanya perlu menunaikan rukun dan juga wajib haji yang kalau ikut perkiraannya kalau wukuf pada 9 hari bulan, kita sampai 8 hari bulan, kita mungkin bertolak pada 7 hari bulan. Itu terpulang kepada Kerajaan Saudi bila yang terakhir kita boleh masuk. Kadang-kadang dia benarkan masuk hanya pada 4 hari bulan. Jadi kalau 4 hari bulan ia memerlukan mungkin 12 hari. Itu maksimum. Kalau biasanya hanya lapan hari. Kalau masuk 8 hari bulan, 9 hari bulan kita wukuf, 10 hari bulan kita berada di Mina. Kita melontar tiga hari, kita balik buat tawaf wida’ dan terus pergi ke Madinah. Selepas itu balik ke Malaysia. Lapan hari mencukupi. Jadi kita menggalakkan pihak swasta melihat bahawa buat haji ini ialah yang paling penting ialah rukun haji. Keduanya wajib haji yang boleh diambil kira dalam tempoh sepuluh sampai 12 hari. Jadi pihak swasta saya rasa boleh berbuat demikian yang mungkin mereka tidak mampu kalau kita bagi 40 hari.
Terima kasih Tuan Yang di-Pertua. Terima kasih juga kepada Yang Berhormat Menteri kerana memberi jawapan persoalan tentang keistimewaan yang diberi dari segi cuti kepada kakitangan walau pun soalan asal daripada Yang Berhormat Pandan kemudiannya diubah kepada yang lain. Akan tetapi saya hendak mengucapkan terima kasih kepada pihak kerajaan dan juga tahniah kepada Tabung Haji. Walau pun dalam keadaan apa sekali pun yang dinyatakan tadi, Tabung Haji berjaya mengekalkan dan menjaga kepentingan pendeposit-pendeposit mereka dengan pulangan yang boleh dikatakan commendable, dengan pulangan dividen 8% yang diberi pada tahun 2012 malahan lebih tinggi daripada kadar fixed deposit dan tabungan-tabungan yang lain. Soalan saya kepada Yang Berhormat Menteri, apakah kerajaan dengan bantuan- bantuan yang dibuat melalui 1MDB yang diberi peluang kepada jemaah-jemaah haji menunaikan daripada kelompok kalangan yang tidak berkemampuan, apakah kerajaan ada perancangan untuk memberi insentif kepada mereka yang terdiri daripada kakitangan-kakitangan bawahan yang telah berkhidmat lama dalam sektor perkhidmatan awam ini untuk membolehkan mereka menunaikan haji? Ini kerana ada kalanya mereka di saat sampai ke umur usia persaraan pun mereka masih belum mampu untuk menunaikan haji, tambahan pula ini merupakan rukun yang kelima. Barangkali inilah antara penghargaan yang kerajaan beri kepada kakitangan awam dan bukannya menganggap kakitangan awam ini macam kucing kurap atau pun anjing sebagaimana yang dikatakan oleh puak-puak tertentu. Terima kasih.
Tuan Yang di-Pertua, ini adalah cadangan yang cukup baik, teramat baik dan kita akan beri perhatian yang sewajarnya. Akan tetapi saya hendak beritahu kepada Yang Berhormat, oleh kerana kekuatan kewangan Tabung Haji yang di antara yang luar biasa, maka pakej muassasah yang mana harganya melampaui RM16,000 tetapi Tabung Haji beri di tahap RM9,980. Makna kata kalau dia tidak ada kekuatan kewangan tidak mungkin Tabung Haji boleh memberi subsidi yang begitu tinggi kepada semua jemaah haji. Inilah suatu yang kita patut bagi tabik hormat kepada Tabung Haji. [Applause] Bagi mereka yang kaya bolehlah mereka ambil pakej Almas yang berjumlah RM145,000, Zamrud sebanyak RM83,000 dan pakej Nilam sebanyak RM41,000. Akan tetapi pakej pegawai kerajaan ini makna kata mereka masih berada di tahap kemampuan. Mungkin kerajaan boleh mempertimbangkan dalam aspek-aspek yang lain seperti Yang Berhormat sebutkan bahawa bagi kerajaan setiap anggotanya termasuk rakyat jelata ialah bertaraf manusia dan tidak bertaraf seperti yang disebutkan oleh pihak-pihak tertentu.
Keduanya Yang Berhormat, kita menggalakkan pihak swasta untuk membuat penajaan atau memberi sedekah untuk orang menunaikan haji bagi mereka yang tidak mampu seperti 1MDB. Mungkin juga Amanah Raya yang mempunyai pelaburan yang cukup besar boleh berbuat demikian dan juga lain-lain pihak. Mereka boleh berbuat demikian dari semasa ke semasa sebab haji ini adalah rukun dan sudah pasti kalau kita laksanakan kita adalah yang terbaik dalam kehidupan kita. Yang Berhormat Pandan baru balik dari Makkah. Pak Haji selamat mendapat haji yang mabrur. Semoga kita sentiasa menjaga perawakan lidah kita supaya sentiasa bertaraf haji... [Applause] Bukan dia seorang tetapi semua sekali. Ramai di sini juga bertaraf haji. Jagalah taraf haji kita dengan menjaga mulut kita. Terima kasih. [Laughter]
5. Dato’ Haji Abdul Rahman bin Haji Mohamad [Lipis] minta Menteri Pendidikan menyatakan: (a) mekanisme kementerian dalam mengatasi kelewatan penempatan graduan Ijazah Sarjana Muda Pendidikan (ISMP) di IPTA dan IPGM ke sekolah semenjak akhir-akhir ini; dan (b) perancangan jangka panjang untuk graduan ini sekiranya tidak ditempatkan di mana-mana sekolah sedangkan mereka ini memiliki Ijazah Sarjana Muda Pendidikan.
Terima kasih Yang Berhormat Lipis atas soalan yang terdiri daripada dua perkara. Tuan Yang di-Pertua, penempatan graduan adalah berdasarkan kepada kekosongan perjawatan yang ada. Apabila bekalan diterima, penempatan akan dilaksanakan mengikut kekosongan perjawatan dan keperluan opsyen. Mulai tahun 2012, pelantikan dan penempatan graduan pendidikan keluaran IPTA dan Institute of Teacher Education (IPG) tidak lagi secara automatik yang mana pelantikan adalah dibuat secara lantikan tetap dan tiada lagi lantikan secara sandaran. Ministry of Education Malaysia (KPM) berpandangan bahawa tidak timbul isu kelewatan dalam penempatan guru baru memandangkan semua graduan pendidikan perlu menjalankan prosedur pelantikan dan penempatan yang telah ditetapkan. Graduan pendidikan yang tamat pengajian dan diperakukan oleh Senat IPTA dan IPG perlu memohon di portal www.jobsmalaysia.gov.com bagi tujuan panggilan temu duga oleh Education Service Commission (SPP). Bakal guru hanya akan ditempatkan ke sekolah-sekolah setelah mereka lulus temu duga dan diperakui oleh pihak SPP. Ini bertujuan untuk memastikan guru-guru yang dilantik berkualiti dan memenuhi Malaysian Teacher Standards. Mereka akan ditempatkan ke sekolah dengan tawaran jawatan Graduate Education Service Officer (PPPS) Gred DG41. Sama seperti jawatan perkhidmatan awam yang lain, pelantikan dan penempatan guru adalah berasaskan kepada kekosongan jawatan dan keperluan opsyen. Untuk maklumat Ahli Yang Berhormat juga, secara umumnya, Ministry of Education Malaysia tidak menjanjikan penempatan kepada graduan Ijazah Sarjana Muda Perguruan IPTA kerana sebahagian besar daripada mereka bukan ditaja oleh Ministry of Education Malaysia dan tiada sebarang ikatan perjanjian dengan pihak Ministry of Education Malaysia. Sekian terima kasih.
Tuan Yang di-Pertua, saya mohon kemukakan soalan tambahan. Sekarang ini, terdapat lebih kurang 4,000 lebih ataupun lebih kurang 4,400 orang graduan Ijazah Sarjana Muda Pendidikan dan lebih kurang 3,500 daripada IPTA yang sedang menunggu penempatan, dianggarkan lebih kurang dalam 8,000 yang masih menunggu penempatan. Kalau kita melihat harapan mereka ini terlalu tinggi untuk mendapatkan pekerjaan sebagai seorang guru kerana mereka ini telah dilatih secukupnya semasa mereka sama ada di maktab perguruan ataupun Sultan Idris Education University (UPSI) dalam jangka masa yang panjang. Sudah pastilah mereka ini tidak mungkin boleh mendapatkan pekerjaan di sektor-sektor lain kerana mereka adalah merupakan graduan
di dalam bidang pendidikan. Kita pula ahli-ahli wakil rakyat ini, Ahli-ahli Yang Berhormat sering kali pergi merasmikan berbagai-bagai program di peringkat sekolah dan ada ketikanya kita menanyakan kepada pihak-pihak sekolah ataupun pengetua dan guru besar terdapat masih banyak keperluan yang diperlukan penempatan seperti yang kita perlu isi di dalam kekosongan tersebut. Saya mohon soalan tambahan, bilakah pelantikan-pelantikan ini, walaupun Menteri menjawab ia bergantung kepada kekosongan tetapi mereka ini ada yang sudah mencecah sehingga setahun yang menunggu untuk ditempatkan di dalam sekolah- sekolah yang mempunyai kekosongan? Soalan saya, bilakah sebenarnya, walaupun tidak ada jaminan, sekurang-kurangnya pihak Kementerian Pendidikan boleh memberi satu jaminan sekurang-kurangnya untuk menentukan bilakah mereka ini boleh dipanggil temu duga dan boleh ditempatkan di dalam tempat kekosongan-kekosongan tersebut? Kita semua juga tahu pihak kementerian mewujudkan program-program latihan perguruan seperti Postgraduate Teaching Course, Postgraduate Teaching Diploma, guru sandaran dan kursus dalam cuti dan sedangkan, kita tahu bahawasanya yang saya sebutkan dua daripada UPSI dan maktab perguruan ini, sudah tentu terlatih. Kenapa kita kadang-kadang menyebabkan lambakan guru yang banyak kerana berdasarkan yang saya nyatakan tadi, kursus-kursus perguruan lepasan sedangkan sebagai contoh, mereka seorang jurutera, mereka seorang arkitek tetapi tidak dapat kerja, masuk, minta dalam lepasan ijazah. Maka, mereka ini yang dapat dahulu daripada mereka yang empat tahun duduk di dalam UPSI dan juga di maktab perguruan. Ini harus dipertimbangkan supaya lambakan ataupun pembaziran tidak berlaku. Soalannya, mohon penjelasan daripada Menteri.
Terima kasih Yang Berhormat Lipis atas soalan tambahan yang berkaitan dengan bila Ministry of Education Malaysia boleh janji. Jadi di sini, saya hendak sampaikan kepada Yang Berhormat bahawa temu duga sedang dijalankan dan semua seramai 6,341 graduan tamat pada bulan Jun dan Ogos termasuk seramai 6,020 GSTT sudah dipanggil untuk temu duga dan akan ditempatkan di bulan Januari pada tahun depan dengan mengambil kira kekosongan jawatan dan keperluan opsyen, keputusan Senat IPTA dan IPGM dan keputusan temu duga oleh Education Service Commission. Berkaitan dengan IPTA, memang Kementerian Pendidikan juga bekerjasama dengan SPP untuk temu duga dijalankan. Apa yang sangat penting di sini, kita mesti memahami bahawa penempatan guru mengambil masa dan ini beroperasi dalam satu proses yang mana kita Ministry of Education Malaysia hendak dapat senarai graduan yang lulus daripada Senat universiti-universiti dan selepas itu, Ministry of Education Malaysia akan serah senarai itu kepada SPP yang mana tanggungjawabnya adalah untuk panggil graduan yang sudah lulus untuk menghadiri temu duga. Paling penting adalah yang mana graduan-graduan tidak boleh sangka bahawa mereka akan diberi penempatan sekiranya mereka tidak lulus temu duga. Memang saya sudah memberi banyak nasihat kepada graduan-graduan apabila mereka berkomunikasi dengan saya melalui Facebook, e-mel atau SMS bahawa apa yang sangat penting adalah mereka sepatutnya menggunakan masa untuk buat persediaan supaya apabila dipanggil untuk menghadiri temu duga, mereka bersedia dan jangan gagal temu duga. Kalau gagal dalam temu duga, ini bermakna mereka hendak menunggu selama enam bulan lagi dan selepas itu ikut prosedur yang mana mereka hendak memohon melalui www.jobsmalaysia.gov.com lagi dan tunggu untuk dipanggil menghadiri temu duga sekiranya ada kekosongan dan perkhidmatan opsyen mereka diperlukan. Sekian terima kasih.
Terima kasih Tuan Yang di-Pertua, Yang Berhormat Menteri. Saya faham kenyataan Yang Berhormat Menteri bahawa kerajaan tidak pernah menjanjikan kerja kepada pemegang Ijazah Sarjana Muda Pendidikan swasta terutamanya daripada IPTS. Cuma, yang mereka kecewa dan yang perlu dijawab oleh kerajaan kelulusan untuk menganjurkan dan menawarkan kursus- kursus ini di IPTS termasuklah yang dimiliki oleh parti-parti di dalam kerajaan, IPTS- IPTS ini perlu melalui proses kelulusan di peringkat Ministry of Higher Education.
Dia juga perlu melalui proses akreditasi dan juga proses oleh PTPTN untuk diberikan pembiayaan. Kita juga perlu ingat bahawa di dalam Malaysia hanya sekolah- sekolah sahaja yang menerima pemegang Ijazah Sarjana Muda Pendidikan untuk pekerjaan. Tidak ada syarikat lain yang akan terima. Jadi, soalan saya kepada Yang Berhormat Menteri kenapakah agensi-agensi di bawah Kementerian Pendidikan masih terus dan sebelum ini terus memberi kelulusan kepada IPTS untuk menawarkan kursus- kursus ini sedangkan Kementerian Pendidikan sendiri tahu bahawa tidak ada tempat yang mencukupi untuk menyerap pelajar-pelajar ini.
Terima kasih atas soalan yang berkaitan dengan kelulusan untuk kursus-kursus yang ditawarkan di IPTS. Bagi saya kursus-kursus yang ditawarkan khasnya yang berkaitan dengan pendidikan diluluskan oleh pihak Ministry of Education Malaysia adalah dimana kita mesti faham bahawa di Malaysia bukan hanya ada IPTA sahaja dan sekolah-sekolah kerajaan tetapi kita juga ada institusi swasta seperti sekolah swasta dan sekolah antarabangsa serta institusi kemahiran yang swasta. Jadi, ini bermakna bahawa pihak graduan yang sudah dilatih atau sudah graduate, dengan izin, dari IPTS, maka mereka ada peluang untuk bekerja di dalam institusi pendidikan yang swasta. Sekian, terima kasih.
Terima kasih Yang di-Pertua yang baik budi memberi ruang kepada Kuala Langat untuk soalan nombor 3. Yang di-Pertua, Yang Berhormat Timbalan Menteri, di samping kita...
[Speaking without using the microphone]
Belum lagi sampai kemuncaknya. Tuan Yang di-Pertua, Yang Berhormat Timbalan Menteri, di samping kita memperkasakan atau pun melihat dari sudut IPTA diberi ruang untuk mereka menjadi pengajar dan juga kelulusan daripada Sarjana Muda Pendidikan, saya dimaklumkan amalan kegunaan guru sandaran masih dilakukan. Tiga, empat tahun mereka bekerja menjadi guru sandaran. Kalau benar, baru soalan saya. Apakah mereka ini juga tidak diberi peluang untuk menjadi guru tetap kerana amalan itu berterusan sehingga empat, lima tahun? Saya mohon kementerian untuk melihat juga kumpulan ini yang menjadi guru sandaran yang melepasi empat, lima tahun itu diberi peluang? Terima kasih Tuan Yang di-Pertua yang budiman. Huh, dahsyat.
Terima kasih Yang Berhormat, ini merupakan satu cadangan dan cadangan diterima dan Ministry of Education Malaysia akan mengkaji cadangan yang dikemukakan oleh Yang Berhormat. Sekian, terima kasih.
Yang dia tidak sebut tadi, siapa yang dahsyat. Diakah, Tuan Yang di-Pertuakah atau Menteri? [Laughter] Jangan bola tanggung Yang Berhormat.
6. Tuan Su Keong Siong [Ipoh Timur] minta Menteri Pendidikan menyatakan jumlah hutang PTPTN yang tertunggak pada masa kini, nyatakan langkah-langkah yang diambil untuk mengatasi masalah ini. Adakah kerajaan mempunyai rancangan untuk menyenaraihitamkan nama pelajar-pelajar yang gagal membayar hutang PTPTN di bawah sistem CCRIS atau C-TOS.
Thank you, Honourable Member for Ipoh Timur. Mr Speaker, as of 30 October 2013, a total of 1,345,894 borrowers were required to make repayments amounting to RM9.7 billion. Of this amount, 900,046 borrowers, or 60%, have made repayments amounting to RM4.87 billion, or 50.4%. Meanwhile, RM4.8 billion is the total arrears owed by 430,148 borrowers who have never made repayments, as well as arrears owed by borrowers who were permitted to pay instalments lower than the actual instalments. Among the measures that have been and will be taken by to resolve this problem are as follows. First, holding customer-friendly programmes. PTPTN has held several activities to bring PTPTN closer to
financing recipients. Among the activities carried out are campaigns and talks at government and private institutions, briefings together with the Agensi Kaunseling dan Pengurusan Kredit (AKPK), Bank Negara, to final-year students at IPTA, and free distribution of personal financial management books. PTPTN has also opened 12 state PTPTN offices, namely PPN Selangor, PPN Perak, PPN Negeri Sembilan, PPN Kelantan, PPN Pulau Pinang, PPN Sarawak, PPN Melaka, PPN Pahang, PPN Terengganu, PPN Sabah, PPN Kedah and Perlis, and PPN Wilayah Persekutuan Kuala Lumpur, Johor. In addition, there are 4 PTPTN branch offices, PPC, namely PPC UTC Perak, UTC Pahang, UTC KL and UTC Kedah, as well as two one stop centres, with permission, namely one stop centre KL Sentral, with permission, and one stop centre, Putrajaya, with permission. The second measure is to establish a responsible officer system, namely PTJ. Beginning 1 December 2012, PTPTN has also established the PTJ system, where each PTPTN officer is assigned to supervise nearly 6,500 PTPTN financing recipients. PTJ will communicate directly with financing recipients regarding repayment questions and also answer every question concerning education financing. They will also carry out monitoring and follow-up actions to constantly update the records of recipients under their respective supervision. The third measure, providing repayment incentives. During the tabling of Budget 2013 on 28 September 2012, the Right Honourable Prime Minister gave incentives to PTPTN borrowers to encourage repayment, such as a 20% discount on the balance for borrowers who settle the debt in one lump sum within a period of one year beginning 1 October 2012. Meanwhile, a 10% discount per year will be given to borrowers who pay their loans consistently according to schedule beginning 1 October 2012.
The fourth measure relates to enforcement action. Enforcement actions such as summonses and blacklisting with the Immigration Department of Malaysia are a last resort to give warning to hardcore borrowers after various reminder measures urging them to start repaying their loans have been ignored. For the information of Honourable Members, blacklisting is carried out after five reminder notices have been sent to the borrower, or 16 months after completion of studies. These actions are taken to raise the level of awareness, understanding and responsibility of the public regarding the need to repay PTPTN loans. Based on existing work procedures, PTPTN has already implemented a flexible approach in recovering loan repayments before blacklisting borrowers. For the information of Honourable Members, so far the government does not intend to implement any action to list the names of borrowers who fail to repay PTPTN debts under the CCRIS or CTOS system. Thank you.
Thank you, Mr Speaker. Blacklisting defaulting borrowers in CCRIS is a very drastic action and it will bring a burden and bad effects to those borrowers. It will also jeopardise the future of... [Interjection] Wait! ...the future of those borrowers. From the answer we received just now from the Honourable Deputy Minister, there are plans, activities and programmes carried out to recover these loans. I can see that, recently, from the statement by the Deputy Minister, out of 132,801 where action has been taken, about 45,000 have taken action to repay. I can see this has produced results in recovering these PTPTN arrears. So my question is, why does the government not step up these efforts, and why must there be a plan or scheme to blacklist in CCRIS. Are not the measures that have been stated by the Honourable Deputy Minister roughly said to be effective, because from the action taken
against those 132,000, roughly 30% have repaid. So why is there a need for action to blacklist in CCRIS and CTOS? My second question, which is another one I wish to ask: has the government carried out any studies or measures to determine whether PTPTN can be abolished, because everyone knows PTPTN is a burden on new graduates. When they graduate, they have PTPTN debts of tens of thousands, and they have to get married, find jobs, and bear the rising cost of living. Those are my questions. Thank you.
Thank you for both questions. The first question relates to the listing of names of borrowers who default on PTPTN debts under the CCRIS or CTOS system. I wish to inform the Honourable Member that the ministry is studying a module, namely Income Contingent Loan Recovery or ICLR, to see its effectiveness if implemented against borrowers who do not repay. This issue, Honourable Member, is in fact related to the integrity of a borrower. The second question relates to whether the ministry has a plan to abolish PTPTN. Here I wish to convey to all Honourable Members, there certainly has been discussion and deliberation. If we abolish PTPTN, we can see several shortcomings. One of them is that if we cancel or abolish PTPTN, this will involve higher taxes being imposed. Second, opportunity cost, with permission, and if the government has to spend billions of ringgit to provide free education, there will be an opportunity cost, and allocations will decrease in other sectors such as development, construction, health, agriculture and others, including tax reductions. Regarding the quality of education, we can look at academic freedom, when education is fully financed by the Federal Government, there will be specific guidelines or regulations that must be complied with by institutions and teaching staff. And this will limit academic freedom or the ability of lecturers to teach what they think is best for students. Excessive dependence on government subsidies in higher education may encourage administrative inefficiency and the quality of courses offered by universities. The next point relates to an attitude of undervaluing education when a person pays for education, whether for themselves or their children, is more involved in the whole education process. When parents pay for their children's education, they expect to get the best value for their money. So in a higher education system, students who pay for all or part of their education are more inclined to value their education compared with those who receive education for free. Paying for one's own education helps students learn to be more responsible and work harder to obtain good grades. Thank you.
May I ask for clarification? Honourable Deputy Minister, just now the Honourable Deputy Minister said that when someone pays for education, they will value it. I think that statement is inaccurate because to value education, one must be given the opportunity and not pay for it. Look, when they have to pay for education when they go abroad, they do not return, in Singapore, in the United States, in Britain, Australia, all do not return. Why? Because there is no opportunity for education here. So that statement is inaccurate. Does the Honourable Deputy Minister agree?
Yang Berhormat, ini adalah Yang Berhormat punya ‘pendapatan’, and you are entitled to your own opinion. Terima kasih [Disampuk]
[Dewan Riuh]
Sorry, my apologies. Opinion, your opinion, with permission. Not "pendapatan" (income). Sorry.
[Bangun]
This is the quality of teachers..
Honourable Member for Mersing. Honourable Member for Segambut, Honourable Member for Segambut.
Aiyo, kasihan.
Mr Speaker, thank you. Supplementary question. PTPTN is a policy that follows the natural order, where we want to see more of our citizens holding higher education degrees from universities, so the government adopted an open policy. More public universities and private universities are encouraged and, at the same time, given loan facilities. Those who excel are given it free because they do not need to pay if they get a first class honours. However, there are also contrary opinions, especially from the opposition, where higher education too should be free of charge or gratis. Therefore, I wish to ask the Honourable Minister, is the contrary proposal from the opposition, which we know the top 10 universities in the world [Interjection] all charge fees, the first ten best universities in the world do charge fees, in the world. I want to ask whether this free education proposal being publicised by the opposition is what has caused the percentage of those who refuse to repay PTPTN loans to increase. Has any study been conducted?
Regarding the study, I have already informed that the discussion process and the process that does not only monitor but also reflects on the implementation of PTPTN are carried out continuously. I can share with the Honourable Member here regarding a discussion and a reflection on the effects if we were to abolish PTPTN. Apart from what I have shared with the Honourable Member regarding the shortcomings, now I wish to share about the effects. If we abolish PTPTN, we will limit access to higher education among poor students. Here we have already found that before PTPTN was implemented, the government was only able to provide scholarships for around 26,000 students a year. In 2012 alone, a total of 209,963 persons succeeded in pursuing higher education sourced from PTPTN financing. In 2012, the government had to provide education financing totalling RM4.2 billion to finance the tuition fees and living costs of students at IPTA and IPTS. This amount does not include the 90% tuition fee subsidy that is currently borne by the government. The government had to write off PTPTN debts totalling RM31.1 billion and carry out refinancing for students who had made loan repayments amounting to RM4.1 billion up to 31 May 2013. This resulted in a lack of resources for financing tuition fees of IPTS students and resulted in a lack of resources to pay the living costs of IPTA and IPTS students. For IPTA students, only around 15% to 30% of PTPTN loans are used to pay tuition fees, while 70% to 80% are used to cover living costs. As for IPTS students, 70% is used for tuition fees and 30% for living costs, and it spurs efforts to achieve the aspiration of making Malaysia a national higher education hub by 2020. So I think students or Malaysians should be grateful that the government has established a PTPTN scheme, especially to help poor students to pursue their studies at IPTA. Thank you.
Mr Speaker, a note from the Honourable Member for Sibuti. We welcome the community leaders and NGOs from the parliamentary constituencies of Sibuti and Bandar Miri, led by Temenggung Haji Abdul Rahman Fadzil. [Applause]
7. Dato' Ir. Haji Nawawi bin Ahmad [Langkawi] asks the Prime Minister to state whether the Ministry has any plans to build NGV stations or to add NGV pumps at existing petrol stations on Langkawi Island.
Thank you, Honourable Member for Langkawi. In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh and peace greetings, 1Malaysia greetings. Mr Speaker, for the information of the House, Petronas currently has a total of 176 stations supplying natural gas for vehicles, or NGV, in Malaysia. NGV is used by more than 57,000 vehicles, including approximately 55,000 taxis, and 93 of these stations are located in Selangor and the Federal Territory, while 10 are located in the state of Kedah. However, at this time Petronas has no plans to open an NGV station on Langkawi Island. This is due to three matters. Firstly, there is no gas pipeline infrastructure to channel natural gas from the Peninsula to Langkawi Island. Secondly, in terms of the station development cost, which is quite high, namely at least RM250 million per station, and thirdly, it is due to the very high subsidy cost. For example, the price of NGV at the pump is 68 sen per litre compared with a cost of RM2.03 per litre. This means Petronas provides a subsidy of RM1.35 per litre, and for 2012, a total of RM600 million has already been spent by Petronas on NGV subsidies. So at this time, there are no plans to expand to Langkawi Island. Thank you.
Thank you, Honourable Minister. I understand that what the Honourable Minister has just informed us is that there are difficulties in terms of infrastructure to bring gas to Langkawi Island. Yet Langkawi Island, as a tourist centre, is very suitable for using gas because it does not produce high carbon dioxide emissions. But for the information of the Honourable Minister, we now already have a ferry called the RORO (roll in roll out) ferry, which can carry lorries, tankers, buses and also cars from Kuala Perlis to Langkawi. If the Honourable Minister says that over there, in Kedah, there are already 10 stations, there must certainly be a centre to take this gas from the state of Kedah. So what is the harm if this tanker travels a little further across the sea for two hours to deliver this gas to Langkawi Island, because in my view, the use of this gas is very important to consumers. Consumers like local people, like others not only in Kedah or in Kuala Lumpur, but we in Langkawi also need low vehicle running costs because if we buy RON95 petrol at RM2.10 per litre, in Langkawi we do not have RON97, we only have RON95.
At the same time, by using NGV, the running cost of a car will be one third cheaper than the cost of petrol. In this way, I can also help taxis in Langkawi to earn more income, and also help the community that uses vehicles in Langkawi to get reduced running costs. Furthermore, I understand that in our country, gas reserves are three times that of oil. What I saw on the internet just now shows 14.67 billion barrels of equivalent oil barrel compared with only 5.46 billion barrels of oil. So this means that in our country we have plenty of gas. If we do not use this gas, who else will use it? So I ask for the answer from the Honourable Minister.
Thank you, Honourable Member for Langkawi. We need to look from the perspective of benefits and also cost benefit analysis, with permission, Mr Speaker. The reason I mentioned earlier is the subsidy cost borne by
Petronas at this time is very high, where based on the rate of RM1.35 per litre borne by Petronas, for 2012 alone it has increased to RM600 million. This is only for 176 stations. So for them, if they expand the number of stations further, it will increase their costs even more. Regarding gas reserves, it is true in terms of the amount of reserves. We have 13.6 billion barrels of oil equivalent, with permission, and this is sufficient for production at a rate of 1,000 million barrels equivalent per day. This is enough for 43 years of our reserves. However, the amount of consumption in our country is higher than our production, and that is precisely why Petronas has now purchased gas from abroad, and we have also built a degasification plan, with permission, located in Melaka. So for that, we need to look at cost benefit, and for now, the cost borne by Petronas of 600 million a year is a cost that we do not wish to increase any further. Thank you.
Thank you to the Mr Speaker, who is wise and esteemed, for giving Bakri the opportunity to ask a supplementary question. Here I wish to ask the Honourable Minister, does the government set a target that every district will have an NGV station? If so, when will the time frame for this target be met? If the target fails to be achieved, who must be held responsible? The company, the government, or lack of demand? Is NGV only provided by Petronas or do other companies also offer NGV? I ask for an explanation and an answer. Thank you, Honourable Minister and Mr Speaker.
Thank you, Honourable Bakri. For the time being, only Petronas supplies NGV at the stations I mentioned earlier, which number 176. Other oil companies are actually not interested in implementing NGV because the subsidised price of NGV is 68 sen per litre. So they simply will not open stations, because for every litre of NGV they sell they would lose RM1.35, since their cost is RM2.03 per litre. Petronas is the same. There comes a point where Petronas can no longer spend more. So these 176 stations have already reached the level of RM600 million a year. So they have no plans to expand further. So what Honourable Bakri mentioned earlier, that there are no plans to extend NGV to every district, is because as long as the NGV price is fixed at 68 sen per litre, there is no such plan. But if market prices apply, the oil companies may well be interested in expanding it. Thank you.
Thank you. This is for the information of the Honourable Members. If I call Honourable Bakri to ask a question, it does not mean that he always calls me "budiman" [Laughter] or the like. I like to call Honourable Bakri because his questions are concise, brief, and free of political sarcasm and cynicism. So sometimes they open our eyes too. I too want to know why NGV is not made available everywhere. That is the reason. It is not because he praised me. [Laughter]
8. Dato' Dr. Nik Mazian Nik Mohamad [Pasir Puteh] asks the Minister of Health to state the number of foreign patients who came to Malaysia to receive treatment here, the number of medical centres they visited, and the estimated revenue for the country.
Mr Speaker, thank you to the Honourable Member for Pasir Puteh. This question concerns medical tourism. Mr Speaker, the health tourism industry is among the service sectors with the potential to propel the country's economic growth. The Ministry of Health Malaysia, through the Malaysia Healthcare Travel Council (MHTC), has planned various initiatives and activities for the industry to make Malaysia one of the most outstanding health tourism hubs in the arena
international. The results are evident in the increasing number of health tourists coming to Malaysia every year. In 2010, the number of health tourists who came was 392,996. In 2010 it increased again to 583,296, and in 2012 to 672,727. This year, up to June, it has already increased to 401,000. Meaning, perhaps our expectation is roughly 800,000 more coming this year. Revenue also, naturally Mr Speaker, has increased: in 2010 it was RM338.7 million, in 2011 RM511 million, and in 2012 RM524 million, and this year it is projected to be around RM630 million, Mr Speaker. The total number of hospitals involved in this health tourism industry is 72 hospitals in all, and the ten main and most outstanding among them are: (i) Alin Hospital in Penang; (ii) Penang Adventist Hospital; (iii) Prince Court Medical Centre; (iv) Gleneagles Kuala Lumpur; (v) LohGuanLye Specialists Centre in Penang; (vi) Mahkota Medical Centre in Melaka; (vii) Gelugor Specialist Centre; (viii) Sime Darby Medical Centre in Subang Jaya; and (ix) Hospital Pakar KPJ.
Supplementary question. Thank you, Mr Speaker. The meaning of the Honourable Deputy Minister's answer is that Malaysia is able, or has the potential, to become a leading health tourism destination in the world, with the backdrop of our country being peaceful and tranquil, with the natural beauty bestowed on us by Allah SWT. In addition, we also have medical health facilities comparable to other countries, particularly in the private sector and also in the government sector. So we observe that most of these visitors come to seek out health centres in the private sector only. In the government sector, perhaps our hospitals are already too crowded and congested, and cannot match the comfort and the health or medical services provided by private hospitals. So I would like to ask: does the government intend to establish or look for, or make, some of our health centres comparable to private health centres, and then promote them to tourists or visitors from abroad who wish to obtain treatment in our country? Secondly, concerning my state of Kelantan, is there promotion also carried out by the Malaysia Healthcare Travel Council to promote health centres in the state of Kelantan? I believe there are some in Kelantan too, and I would like to ask whether promotion of health centres in the state of Kelantan has already been carried out. That is all, thank you.
Thank you, Mr Speaker. Actually, the government does have—there are only two centres, namely at UKM Hospital and at Universiti Malaysia Hospital, which are called private wings. This is indeed very popular and one must indeed pay. The rate follows the hospital itself. For now, the government does not intend to add more, because our problem is that we are too congested and there are not enough beds if we were to promote private wings like this. However, only those are mentioned. Actually, Mr Speaker, what we do is promote the overall services in all states, including Sabah and Sarawak, and it is up to the tourists who come whether they wish to choose which one. So we do not restrict where they go. So far, the most popular is in Penang, second Melaka, and third Kuala Lumpur, Mr Speaker.
Thank you, Honourable Members. The question session for Oral Answers has ended. Please proceed. [Time for Questions for Oral Answer has ended]
Motion to Adjourn the Meeting Under S.O. 18(1) — Condemning the espionage by the United States of America, Australia and Singapore that may jeopardise national securityUrgent matter
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh, peace be upon you. Thank you, Mr Speaker. I propose that this august House take note in order to debate a Motion under Standing Order 18(1) to condemn the United States of America, Australia and Singapore for the espionage carried out, which may jeopardise the nation's security. Referring to the revelations of the newspapers Der Spiegel and the Sydney Morning Herald, which reported that intelligence whistleblower Edward Snowden disclosed that intelligence gathering was carried out on Malaysia by the United States Embassy and the Australian High Commission to intercept radio telecommunications and internet information. The irresponsible actions of these countries in spying on the activities of the nation's leaders are an uncivilised act and a challenge to the nation's sovereignty as an independent country. Recently, as reported by the Dutch media, namely NRC Handelsblad, Singapore was also exposed as helping to provide communications access and being a key partner in the 5-Eyes intelligence group led by the United States, for the purpose of recording telephone conversations and monitoring communication networks in Kuala Lumpur and Putrajaya. Furthermore, the Australian media, Fairfax, revealed that Singapore's intelligence was a partner of the Australian electronic intelligence agency, namely the Defence Signals Directorate, with permission, to intercept the South East Asia (SEA), Middle East (ME), Western Euro 3 (WE) cables, which are the longest telecommunications cables in the world and are managed by Singtel, a telecommunications company owned by the Government of Singapore. While we acknowledge the diplomatic relations that have been established between Malaysia and the United States, Australia and Singapore, the main foundation of these relations is mutual trust between countries, which is the core. However, espionage and intelligence activities against each national leadership certainly violate Malaysia as a sovereign and independent nation. Firm actions taken by the leaders of other countries that were exposed as having been subjected to espionage, such as Brazil, Germany and Indonesia, should rightly be emulated by us. The President of Brazil cancelled his official visit to Washington. The Chancellor of Germany, Angela Merkel, issued a strong statement urging President Obama himself to explain the espionage activities against her. The President of Indonesia also demanded an apology from Australia and recalled the Indonesian Ambassador to Australia. Therefore, I am confident that a strong condemnation from this august House is seen as necessary to put pressure on all three countries. We have fallen far behind in terms of foreign policy, if I may say so. Many issues have not been responded to well by us, such as the issues that occurred in Rohingya, the Hamas issue, the Southern Thailand issue, and I think a clear and firm message needs to be conveyed by the people of Malaysia to them. The failure of the government, particularly the Prime
Minister, to adopt a firm stance will allow these uncivilised actions to continue. Thank you, Mr Speaker.
Thank you, Honourable Member. Honourable Members, I have received a notice of a Motion under Standing Order 18(1) from the Honourable Member for Bukit Katil on Friday, 22 November 2013. The text of the Motion is as read out by the Honourable Member just now. In order for this matter to be considered by the House today, I, as Mr Speaker, must be satisfied that the matter
(i) is definite; (ii) is in the public interest; and (iii) requires urgent debate.
(i) the specific condition: this matter is a definite matter; (ii) in the public interest: yes, it is in the public interest; and (iii) it must require urgency to be debated. Honourable Member, I understand that the Ministry of Foreign Affairs summoned the Ambassador of the United States and the Australian High Commissioner on 1 November 2013, and has submitted a Note of Protest to express its disappointment, or in English, "Displeasure of Malaysian" at the allegations. Both embassies have submitted the Note of Protest to their respective capitals and will submit further explanations to the Government of Malaysia. So this means action has already been taken by the Government of Malaysia. Therefore this matter, in my opinion, does not need to be urgently debated, until the order paper is cleared today. Accordingly, I reject the Honourable Member's Motion under Standing Order 18(1). Thank you.
Mr Speaker, I would like to ask for a little clarification on what the Ministry of Foreign Affairs has informed Mr Speaker, that a note has been delivered and the embassies have sent the note to their governments. However, what is the reply from their governments? Until now we do not know. Has their government made a statement requesting...
The answer is in process, Mr Speaker. I have been informed.
...an apology, and to stop any espionage. That is what is very important. If we merely give a Note of Protest, and they receive the Note of Protest but espionage continues and there is no open apology to the Government of Malaysia, that is something that severely undermines the harmony and sovereignty of our country. I ask for clarification from Mr Speaker.
Mr Speaker, in my debate I raised this issue. The reply from the ministry is that they are waiting for confirmation. However, if we follow this Motion, it is an event from which we have obtained much more disclosure. So the issue is, from 1 November to 26 November, that is 26 days, yet we do not see any sense of urgency from the government. That is why we brought this debate. Mr Speaker may consider this, because otherwise this House will fail to put pressure on the executive.
Mr Speaker, with your permission. Actually, Mr Speaker, this issue, two or three weeks ago, I already debated it. I had already raised it, but we were given an explanation that our country practises a different protocol from other countries. Some use force, some display their power, but our approach is different. We were informed that the Ministry of Foreign Affairs is waiting for replies from several countries to which we have sent letters. So we respect the stance of Mr Speaker as our Chairman. Let us not dispute the Honourable Member for Pokok Sena, because if we dispute it, eventually we may drag on to that point. So any decision of the Chairman, I also read in our Standing Orders, is final. Once it is final, it means there is no need to negotiate. That is how it goes. This is not a matter of election campaigning, where we can negotiate, can compromise. This is in the Dewan Rakyat.
The Ministry of Defence says firmness.
Meaning, if we have lost, we have lost. Accept the reality of defeat. Thank you, Mr Speaker.
Terima kasih.
Mr Speaker, this issue is very important, although it has already been raised by the Honourable Member for Kinabatangan, and the government says it is waiting, waiting for feedback from the governments of the countries involved, but what we see is that the actions taken by the government are far too slow. Do we just wait? When we wait, espionage continues. We cannot wait. We must have firm action against these two countries.
Thank you, thank you.
This is right, look, the Honourable Member for Kinabatangan is already wavering, wavering, wavering.
Terima kasih.
Espionage happens everywhere, Mr Speaker, DAP also spies on PAS. It does happen. So it happens. Same, wrong calculation.
Thank you, thank you. Honourable Member, Honourable Member, Honourable Member, Honourable Members. Honourable Member must be aware that when I make a decision, that decision is final and is in accordance with the Standing Orders. And if the Honourable Members also observe my actions over the past five years, when I allowed a motion under 18(1) to be read in the House, and then I rejected it. That means the government must take this seriously. That is why I have done so in certain matters. It does not mean that when I do not allow a matter to be debated, the matter is not important. However, there are motions which I feel waste the time of the House and are made solely for personal purposes and the like. Sorry for saying so, I reject them in chambers. If there are still provisions in the meeting, I reject them from the toilet.
[Ketawa]
But he said only from chambers.
Mr Speaker, I did not ask Mr Speaker to withdraw the decision earlier, I did not ask that. I asked for clarification on whether what the government has provided is merely waiting for information. Is there no further action?
Terima kasih.
I did not ask, I know Mr Speaker is a firm person and Mr Speaker's decision cannot be shaken.
Okey.
That is why we ask the government, it must provide an explanation to Mr Speaker for rejecting it, meaning there must be sufficiently strong reasons. However, if Mr Speaker gives insufficient reasons because insufficient information was provided, this is a weakness on the part of the government.
Thank you, thank you.
That is the reason that has caused Mr Speaker to be compelled to act in such a manner.
Terima kasih.
So that is what I asked for.
Thank you. My explanation is up to that point, Honourable Member. So the government takes note of what was argued by the Honourable Member for Pokok Sena. Secretary, please proceed. Before that, Honourable Minister, the Motion under Standing Order 12(1).
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, the government is always serious and firm in taking any action.
"That pursuant to Standing Order 12(1), the sitting of this House today shall not be suspended until 10.30 pm, and after that the sitting of this House shall be suspended until 10 am on Wednesday, 27 November 2013".
Mr Speaker, I beg to second the motion.
Thank you. Honourable Members, I now put the question to the House for decision. The question is that the motion as moved be agreed to.
[Motion put and agreed to]
Bill — Supply Bill 2014 Second Reading and Development Estimates Motion 2014 CommitteeBill
The Order of the Day was read to resume consideration of the "Supply Bill 2014 and the Development Estimates 2014 in the Committee of Supply." [Seventh Day] [The House resolved itself into Committee] [Mr Speaker presided over the Committee]
Bill — Supply Bill 2014 Second Reading and Development Estimates Motion 2014 Committee — Clause B.29 [Schedule] – Clause P.29 [Development Estimates 2014] –Bill
Head B.29 Operating and Head P.29 Development under the Ministry of Energy, Green Technology and Water are open for debate. Honourable Member for Kapar, please proceed.
Kapar.
This Kapar, if he is in a good mood, he follows the Standing Orders. If he has become a bit angry, he even challenges the Chairman. I saw that video. He asked to be thrown out. Honourable Member for Kapar, please proceed.
Before I begin, Mr Chairman...
Today I see him being okay, Mr Chairman.
I was waiting for him to be not okay today while I was seated. Please proceed.
Mr Chairman, before I begin, with your permission, yesterday Mr Chairman did reprimand the Honourable Member for Shah Alam if he switches to the Ministry of Works. I, sitting here, also feel that way.
I know, I know.
Frustration itu.
Because I have watched the earlier videos. Please proceed.
Thank you, Salam Sejahtera, Good afternoon, vanakam and salam reformasi. Thank you, Mr Chairman, whom I respect, for giving me the opportunity to debate the allocation for the Ministry of Energy, Green Technology and Water.
[Deputy Speaker (Dato' Haji Ismail bin Haji Mohamed Said) chaired the Committee] I would like to draw the attention of Mr Chairman and this august House to the estimated operating expenditure under code 30000 for asset sections. An increase of 1,533%, or roughly 15 times, this year compared with 2013. In 2013, the allocation was 120,000, while for 2014 there is a sharp increase to 1,840,000. I demand an explanation from the ministry. First, the rationale for this sharp increase in allocation. Second, the details of the assets to be purchased. Third, the level of transparency in the purchase of assets and the expenditure of the said data. Mr Chairman, is it changed again, yes? Mr Chairman, I would also like to draw the attention of Mr Chairman and this august House to the estimated development expenditure for the same code. An increase of 206%, namely from RM819,150,300 to RM1,691,926,800. Mr Chairman, of the total funds allocated for development expenditure for this ministry, 86% is for the purchase of assets. So, I once again demand the ministry's explanation on the first point: the rationale for 86% of development expenditure being spent on the purchase of assets. I need an explanation. Second, the details of the assets to be purchased. Third, the level of transparency in the purchase of assets and the expenditure of those funds. Mr Chairman, referring back to the RM1,840,000,000 that will be spent on operating expenditure, it is one-off and is itemised under Supply 070000. Under Supply 070600, RM500 thousand for Developing a Disaster Recovery Centre and Green Data Centre Infrastructure. What is the use of these assets to be purchased? Will these assets reduce and remedy the disasters currently occurring in Malaysia? I also want to demand an explanation of the meaning of Disaster Recovery Centre. Please explain, the disaster nearby here refers to what disaster? What is meant by disaster nearby here? Likewise with Supply 070700 – Upgrading the Network Data Security System amounting to RM400 thousand. What is the use of the assets to be purchased, and I also demand an explanation of the use of this network data security system. Mr Chairman, I now proceed to Supply 010200 - Energy Division. Operating expenditure for energy has decreased from RM5.9 million in 2013 to RM4.8 million in 2014, a reduction of RM1.1 million, an estimated 18.6% cut. The activities under this item aim to coordinate national energy planning and monitor the implementation of related development projects to ensure that these services are supplied in line with the country's socio-economic development needs. I ask the Honourable Minister to explain the rationale for reducing operating expenditure for this item, given that monitoring the implementation of national energy development projects needs to be strengthened. For example, the tragedy of water discharge from the Sultan Abu Bakar Hydroelectric Dam, Cameron Highlands. I ask the Honourable Minister to explain why the government did not take seriously the risk of flooding in Lembah Bertam, which had long been raised by researchers, to the point that four lives were lost in the flood that occurred on 23 October last. The flash flood was caused by the release of water from the Sultan Abu Bakar Hydroelectric Dam, Cameron Highlands, which is operated by TNB.
Mr Chairman, in addition, I ask the Minister to explain what monitoring is carried out by the Federal Government over the 12 dams built by the Sarawak State Government? Is the dam construction site environment researched adequately so that cases like the Cameron Highlands dam will not happen? Were all the Orang Asli in the surrounding area consulted and adequately compensated?
I would like to draw Mr Chairman's attention to the fact that, according to environmental activists, the Bakun and Batang Ai Dams, which are already in operation, do not have a water discharge alarm system to warn downstream residents to evacuate. This will carry risks like the tragedy that occurred in Cameron Highlands. The water released from these dams is estimated to submerge the whole of Sibu Town with a water level of three feet. As also stated by the Director of SUARAM, Datuk Kua Kia Soong, the dam issue is not a Sarawak state issue alone, but involves all Malaysians, because almost all dam construction projects have experienced cost increases over the original contract value, and these construction costs are paid from tax revenue paid by all Malaysians. Mr Chairman, I also want to emphasise that although Sarawak Hidro Sdn. Bhd. or SHSB is owned by the Ministry of Finance, I want to stress here that the monitoring carried out by the Ministry of Energy, Green Technology and Water over the Bakun Dam, since it is their responsibility in coordinating energy planning and monitoring the implementation of related development projects. So I demand an explanation: what monitoring is currently being carried out by the ministry? In addition, I also want to stress that human rights bodies have also stated that the power generation capacity of Batang Ai and Bakun has been excessive and that there is no need to build new dams. Transparency International has also labelled the construction of dams in Sarawak as, "monument of corruption", with permission, and criticised dam construction as an outdated energy supply plan. Datuk Kua also stated that the project to build 12 dams by the Sarawak State Government has caused destruction to the environment, society and economy, especially with construction costs soaring beyond the original costs. However, the Sarawak State Government has affirmed its intention to build more dams to supply more power. With permission, Mr Chairman, based on the issues I have just raised, it must be reminded that the dam issue is not a Sarawak state issue alone. I ask the Federal Government to explain the rationale of the Sarawak State Government for building yet more new dams, given that the two dams already in operation have generated excessive power capacity. What action will the Federal Government take on this issue? Mr Chairman, the issues arising with energy are also...
Yes, Honourable Kapar, wind up.
This has to do with the Rebate Save programme. According to the Minister of Energy, Green Technology and Water, Datuk Seri Panglima Dr. Maximus Johnity Ongkili, he announced that the Rebate Save programme had saved RM64.1 million, but from the text of an email I obtained from the President of the Malaysian Water and Energy Research Association, Saudara Piarapakaran, he has denied that this is true. In his opening he said, this figure is a false figure, that is, this RM64.1 million saving he said is a false figure, for a valid reason that was acknowledged by the ministry's own officers during consultation with this association in 2011. In this text there are also questions raised by this association which read as follows. The association's question to the Minister is: who misled the Honourable Member to mislead Parliament? Please do not remain silent as the ministry has remained silent over the false statement announced by the ministry in 2012 that the government could save RM800 million by replacing all government building lights with LED lights. This silent action is like covering up an elephant carcass with a sieve. Does the ministry often release false numbers to obtain more budget to be implemented every year? This is the text given in the email to me. I demand that the Minister answer the questions from this association. Explain where the RM64.1 million came from through the Rebate Save programme process.
As the winding up and last speaker, Mr Chairman, I would also like to touch on Supply 050000 – Special Programmes. There are two parts. The first is that RM1,700,000 will be spent under Supply 050100 - Overseas Duties. I want to demand why such a large amount of funds has been channelled to this supply? How can this benefit the ministry and every level of Malaysian society by sending officers overseas? I demand an answer to this. Second and last, Mr Chairman, RM11 million has been allocated to the Malaysian Green Technology Corporation. In 2013 it was RM10 million, this year it is RM11 million. I want to know, what is the role of the Malaysian Green Technology Corporation, and how can this body generate funds for the country through green technology? Is a time frame, with permission, a time frame placed on them to generate these funds? I demand that all answers be given orally, even though I am not in the House because I have representatives who will record these answers from the ministry shortly. Thank you. Salam reformasi. Nandri. I apologise, Mr Chairman. There is a problem that I have to leave outside. If, supposing I am not here, I ask the ministry to answer as well, with permission. Thank you.
Okay. I will allow two persons from Barisan Nasional, and two from Pakatan Rakyat. After that the Honourable Minister will reply. Honourable Hulu Rajang. After that Honourable Tebrau. After Honourable Hulu Rajang, Honourable Wangsa Maju.
Thank you, Mr Chairman. I would like to refer to Item 11600 – Water Supply Scheme of Sarawak State.
Keep it short, Honourable Member. Just short.
Yes. I request that the Water Supply Scheme give specific focus to the interior areas of Sarawak, many of which still do not have access to clean and treated water supply. In addition, I want to inform here that the water supply in interior areas is also unstable. For example, burst pipe problems frequently occur at the water pumping station in Kapit District. This is because the pipes are already old and cannot withstand high water pressure. I understand that the old pipes are only six inches in diameter compared with the size to be replaced, which is 12 inches. If a burst pipe occurs, residents cannot use the water source because it is murky and dirty. Meanwhile, in Belaga District, I also request that these pipes be replaced with larger ones because in Belaga there are frequent problems of insufficient pipe capacity to cater for the demand from the growing settlements. In Sungai Asap, 15 longhouses have been connected to the water supply. Many more longhouses are still waiting and requesting to be connected to treated water supply. Therefore, I request that the ministry look into this problem so that the water supply problem can be resolved promptly. That is all, I request support.
Yes, Honourable Gombak.
Thank you, Mr Chairman. I also want to take part in the debate this morning at the level of
the Committee for the Ministry of Energy, Green Technology and Water, with reference to Item 020000 – Pahang to Selangor Raw Water Transfer Project Team, which received an estimated allocation of RM4.3 million in the 2014 Budget.
The water services issue in Selangor state has long been debated at various levels. I am confident that if the Federal Government and the Honourable Minister himself adhere to the principles and spirit of federalism, these disputes can be resolved within the framework of the Constitution and existing laws, for the sake of the people of Selangor state and also the Federal Territories, including Putrajaya. Among the matters still in dispute is the erroneous claim by the ministry and also by SPAN that the treated water reserve is too small. Second, the rate of non-revenue water, or NRW, which has been reduced. Third, the development of Langat 2 Water Treatment Plant. Mr Chairman, I wish to affirm here on behalf of the people of Selangor state that the margin calculated by the Central Government is based on SYABAS's capacity, namely 0.5%, and also that the Central Government and the ministry did not take into account the actual capacity of the water treatment plants, which is at the level of 3.6%. Although we acknowledge that this percentage is still low, if we take into account the ability of several water treatment plants to use an overload approach, it can reach as high as 12.7%. I want to affirm here that, as we are well aware, Selangor state has four companies operating 34 water treatment plants, and the production capacity of these 34 water treatment plants is 4,832 million litres a day. This figure does not take into account the capacity of the plants I mentioned earlier that are operated in overload, that is, exceeding their design capacity, including the Semenyih Water Treatment Plant and the Sungai Langat Water Treatment Plant, which have already been operating in overload for more than 10 years. This aspect can be given consideration if the water shortage issue becomes a debate, and it is expected that with this overload effort the production capacity of the 34 water treatment plants can increase to at least 5,252 million litres a day. The second fact that I want to record in this august House is that the distribution of treated water to consumers throughout Selangor state, the Federal Territory of Kuala Lumpur and Putrajaya is handled by SYABAS. The capacity for distribution of treated water that can be distributed by the system fully operated by SYABAS as of October 2013 was 4,686 million litres a day, whereas the average demand for treated water by SYABAS in October 2013 was only 4,660 million litres a day. Therefore, if we compare the distribution capacity fully operated by SYABAS with the actual demand for treated water, we still have a reserve of 0.5%. However, as I emphasised earlier, if we compare it with the production capacity of the 34 plants, the water supply reserve is 3.6%. This means that the claim that Selangor is experiencing a water shortage crisis is misleading. We affirm that we have a production reserve of 3.6%, but the problem at the distribution level needs attention so that the water that can be produced by these 34 plants reaches consumers. Meanwhile, if we compare it with the capacity of the 34 treatment plants, some of which are operated in overload, the production capacity of treated water is 5,252 million litres a day. Therefore the water supply reserve is 12.7%...
Yes, Honourable Sungai Petani, stand up.
Ya.
Honourable Sungai Petani stands up. Please.
Thank you, Mr Chairman. I would like to ask the Honourable Gombak: with the data the Honourable Gombak has just given, after SYABAS obtained the contract and also permission to distribute this treated water, yet over there many people are still struggling, indeed week after week and month after month, because they do not receive treated water. Is this due to SYABAS's failure to truly see the real problem, or does it have financial problems, or does it simply not care, or what exactly is happening? Yet according to the data the Honourable Gombak just mentioned, the problem is clearly not big except for management problems. So what is the Honourable Gombak's view on this? Thank you, Mr Chairman.
Terima kasih, the Honourable Member for Sungai Petani, yang akan saya hujahkan selepas ini. Saya telah tegaskan tadi, loji rawatan air di negeri Selangor mampu mengeluarkan air terawat sebanyak 4,660 juta liter sehari. Akan tetapi saya hendak kongsi dengan the Honourable Member for Sungai Petani ialah sehingga Oktober 2013 penggunaan sebenar atau yang disebut dalam istilah industri air ini billing consumption ialah hanya 3,067 juta liter sehari. Apa bahasa mudah ialah SYABAS ambil air terawat daripada loji rawatan air di negeri Selangor sebanyak 4,660 juta liter. Sebanyak 4,660 juta liter ini sudah pun masuk dalam paip SYABAS kerana mereka bertanggungjawab sepenuhnya untuk mengagihkan air terawat ini kepada semua pengguna sama ada household atau pun industri. Akan tetapi yang sampai kepada pengguna hanya 3,067 juta liter sehari. Maknanya ada sebanyak 1,605 juta liter sehari yang hilang dalam proses pengagihan air terawat itu yang kita sebut sebagai air tidak berhasil atau pun non-revenue water. Apa sebabnya? Kita boleh hujah, kegagalan SYABAS untuk mengambil tindakan seperti yang terkandung dalam Perjanjian Konsesi untuk membaiki paip-paip dan mengurangkan kadar non-revenue water ini. Mengikut Perjanjian Konsesi yang telah ditandatangani oleh Kerajaan UMNO-Barisan Nasional dengan SYABAS. SYABAS menjanjikan pada tahun 2012, mereka mampu menurunkan NRW ini kepada 19.98%, tetapi sehingga hari ini tidak berlaku. Hari ini kadar air tidak berhasil telah mencecah sebanyak 34.4%. Maknanya bukan ia menurun, semakin banyak CAPEX diberikan semakin tinggi NRW. Akan tetapi alasan yang kita dengar oleh pihak kementerian yang menjadi jurucakap kepada syarikat kroni UMNO mengatakan kerajaan negeri gagal mengeluarkan CAPEX atau pun pembayaran ini kepada pihak SYABAS. Saya hendak nyatakan di sini, SYABAS memerlukan jaminan untuk berbelanja bagi tujuan CAPEX, kononnya untuk baiki paip dan mengurangkan kadar air tidak berhasil. Apa yang menghalang atau pun yang tidak meluluskan ini bukan sahaja Kerajaan Pakatan Rakyat. SYABAS pernah memohon RM3 bilion pada Ogos 2007 ketika Kerajaan Negeri Selangor ditadbir oleh Barisan Nasional. Ketika itu pun kerajaan negeri tidak meluluskan CAPEX sejumlah RM3 bilion ini kerana SYABAS tidak mencerakinkan atau pun memberikan perincian projek-projek mana yang hendak diberikan perhatian.
Kita tidak mahu memberikan open cheque atau pun kelulusan dengan secara terbuka tanpa mengetahui bagaimana perbelanjaan akan dibuat kerana pengalaman yang kita lalui dengan SYABAS, wang yang sepatutnya digunakan untuk baiki paip digunakan untuk buat pejabat, office renovation, membeli kenderaan, elaun yang begitu tinggi dan mewah oleh pemimpin dan pengurusan SYABAS. Maka sudah tentu kerajaan negeri tidak akan memberikan kelulusan sewenang-wenangnya kalau SYABAS gagal memberikan perincian kepada pihak kerajaan negeri bagaimana wang itu akan digunakan. Walau bagaimanapun selepas tahun 2008, kita kena maklum di sini bahawa kelulusan untuk perbelanjaan capex SYABAS telah diambil alih oleh Suruhanjaya Perkhidmatan Air Negara (National Water Services Commission) atau SPAN. Bukan sahaja diletakkan kepada beban tanggungjawab kerajaan negeri. Walaupun kerajaan negeri bersama-sama dengan SPAN akan membincangkan dan menghalusi permintaan SYABAS untuk meluluskan tetapi kelulusan yang akan kita berikan hanya berkisar dan berkaitan dengan
perkhidmatan air, bukan untuk renovation, bukan untuk kenderaan, bukan untuk ubah suai pejabat pengurusan tertinggi SYABAS. Ini yang harus kita maklumkan. Walau bagaimanapun the Honourable Member for Sungai Petani, saya ingin memaklumkan kepada Dewan yang mulia ini sehingga akhir tahun 2012, perbelanjaan capex untuk NRW yang telah diluluskan secara bersama di antara SPAN dengan kerajaan negeri adalah sejumlah RM1.2 bilion. Ini melebihi daripada jumlah yang telah ditandatangani di dalam perjanjian konsesi. Ini kerana dalam perjanjian konsesi di antara kerajaan negeri dengan SYABAS bagi tujuan dan tempoh yang sama jumlahnya hanya RM995 juta. Akan tetapi kita telah memberikan RM1.2 bilion dengan harapan SYABAS dapat mengurangkan kadar air tidak berhasil. Namun sehingga hari ini, apa yang dijanjikan untuk mengurangkan kepada tahap 20% atau pun yang lebih tepat 19.98% telah gagal dicapai tetapi angka yang tercatat hari ini NRW mencecah 34%.
Cukup, the Honourable Member for Gombak, cukuplah, boleh gulung, the Honourable Member for Gombak.
Satu, satu last sekali.
Ya.
Rakyat jelata dimaklumkan bahawa kalau sekiranya Langat 2 tidak disediakan atau pun tidak diteruskan, maka Selangor dan Wilayah Persekutuan akan menjadi masalah yang besar di masa depan. Akan tetapi kalau melihat, dengar penjelasan daripada the Honourable Member for Gombak tadi maknanya priority SYABAS sekarang ini bukanlah Langat 2, priority SYABAS sekarang ini adalah untuk detect, mengenal pasti di mana tempat paip-paip bocor, menyelesaikan masalah itu, saya kira dengan the expenditure ataupun dengan kewangan yang diberikan, saya kira SYABAS mampu melaksanakan daripada ia sibuk hendak buat Langat 2. Apa pandangan the Honourable Member for Gombak tentang ini?
Terima kasih, the Honourable Member for Sungai Petani. Pendirian kerajaan negeri ialah kita bersetuju supaya Langat 2 ini dibangunkan dengan syarat, ianya bersyarat. Penstrukturan industri air di negeri Selangor ini mesti dimuktamadkan terlebih dahulu iaitu semua syarikat konsesi air di negeri Selangor, empat-empat syarikat yang telah diberikan dan diswastakan oleh UMNO dan Barisan Nasional ini mesti menyerahkan industri perkhidmatan air ini kepada kerajaan negeri. Ini adalah akta yang telah diluluskan di Dewan Rakyat ini iaitu Akta Perkhidmatan Industri Air 2006. Tujuan akta ini digubal ialah supaya Kerajaan Pusat dengan regulator yang dibentuk iaitu SPAN boleh mengawal industri perkhidmatan air. Sebelum itu apa yang berlaku ialah sebagai contoh, saya hendak beri contoh di sini. Pada tahun 1995, UMNO Selangor telah meluluskan loji rawatan air ini diswastakan kepada Puncak Niaga. Tahun 1995, loji rawatan air ini adalah aset kerajaan negeri. Ia telah swastakan kepada Puncak Niaga. Maka Puncak Niaga guna loji rawatan air ini untuk merawat air dan oleh sebab mereka yang operate LRA ini, mereka yang menentukan kadar taraf air untuk dijual kepada PUAS. Maka kadarnya tinggi. Apa yang berlaku, PUAS tidak mampu membayar kadar tarif air yang terlalu tinggi menyebabkan PUAS berhutang dengan Puncak Niaga berjumlah RM3 bilion. Maka bila PUAS berhutang RM3 bilion, ia sudah puas hutang, tidak mampu hendak bayar. Pada tahun 2005 sekali lagi UMNO parti yang memperjuangkan Melayu, Islam, rakyat didahulukan, dia swastakan pula PUAS kepada SYABAS. Ini yang berlaku. Maka SYABAS sekarang ini menguasai PUAS, memang 'puas' sungguh dan dia juga menguasai loji rawatan air melalui Puncak Niaga. Maka atas kesedaran inilah Kerajaan Pusat dan Dewan yang mulia ini pada tahun 2006 menggubal akta yang saya sebut tadi, Akta Perkhidmatan Industri Air supaya negeri-negeri lain jangan ikut jejak langkah UMNO Selangor yang menswastakan industri perkhidmatan air kepada syarikat-syarikat swasta.
Cukuplah, cukuplah, Honourable Member.
Sikit lagi, sikit lagi, satu-satu...
Cukuplah ya?
Sikit, sikit lagi.
the Honourable Member for Sepang, cukuplah, cukuplah.
Saya hendak tanya, soalan saya sikit saja.
Sudah panjang sangat sudah bagi masa ini.
Bolehlah sikit saja. Adakah the Honourable Member for Gombak bersetuju dengan saya bahawa dari segi Islam sendiri, air dan elektrik khususnya ialah komoditi yang sepatutnya share oleh semua orang. [Reading a passage of a hadith] yang bermaksud manusia ini berkongsi tiga perkara. [Reading a passage of a hadith] Air, api dan juga padang ragut. Jadi berdasarkan kepada hadis ini bersetuju atau tidak dengan saya, the Honourable Member for Gombak, bahawa benda-benda yang seperti ini tidak seharusnya diswastakan sebab ia adalah keperluan bersama. Maknanya kita patut memikirkan bagaimanakah mereka mendapat menikmati kemudahan asas ini dengan harga yang paling minimum? Terima kasih.
Terima kasih, the Honourable Member for Sepang. Mr Chairman, saya akan gulung. Saya bersetuju dengan the Honourable Member for Sepang bahawa air ini ialah public utility, anugerah yang diturunkan oleh Allah SWT untuk diagihkan, untuk dimanfaatkan untuk semua rakyat secara adil. Sebab itu Kerajaan Negeri Selangor di bawah kepimpinan the Most Honourable Tan Sri Abdul Khalid Ibrahim mewakili Pakatan Rakyat mengambil pendekatan terikat dengan Akta Perkhidmatan Industri Air 2006 dan telah membuat lima kali tawaran kepada syarikat konsesi. Kali yang terakhir pada 21 November yang lalu. Kali ini kita membuat tawaran kepada empat syarikat dengan jumlah RM9.6 bilion. Akan tetapi sehingga hari ini keempat-empat syarikat tidak dijawab kerana di belakang mereka adalah Kerajaan UMNO dan Barisan Nasional. Sepatutnya peranan Kerajaan Pusat, the Honourable Minister, saya hendak minta jaminan Kerajaan Pusat pada tengah hari ini patutnya facilitate, bantu kerajaan negeri supaya membolehkan empat syarikat konsesi ini bersetuju dengan tawaran kerajaan negeri. Semalam, malam tadi saya dengar the Honourable Member for Tanjong Karang dia bangun, oh dia kata ini 'willing seller, willing buyer'. Ini kalau jual udang bolehlah begitu. [Laughter] [Applause] Ini industri perkhidmatan air. The Honourable Minister tidak boleh nafikan bahawa Kerajaan Pusat ada golden shares dalam SYABAS, gunakan golden shares itu untuk persuade dan yakinkan keempat-empat syarikat lepaskan pegangan mereka dan terima tawaran oleh kerajaan negeri sebanyak 9.6 bilion. Ini juga telah diluluskan oleh Jemaah Menteri Kabinet Tuan Pengerusi pada Januari 2008. Jemaah Menteri Kabinet telah meluluskan dan telah membuat keputusan dan telah keluarkan secara bertulis di mana pada Januari pada tahun 2008, Jemaah Menteri Kabinet menyatakan bahawa Kerajaan Negeri Selangor diluluskan untuk mengambil alih Industri Perkhidmatan Air. Kemudian melantik pula Kumpulan Darul Ehsan Berhad (KDEB) sebagai operator kepada Langat 2. Mengapa tidak guna pakai keputusan yang telah dibuat oleh Jemaah Menteri Kabinet?
Bukan baru, sudah lima tahun. Sebagai Menteri, the Honourable Minister bertanggungjawab. Pertama, berpegang kepada Perlembagaan dan akta yang saya nyatakan tadi iaitu Akta Industri Perkhidmatan Air 2006 supaya industri perkhidmatan air ini lebih cekap, lebih efisien. Nyata, di bawah SYABAS dan empat syarikat ini, industri perkhidmatan air membebankan rakyat. Baik, bila saya hendak jawab, saya hendak tegur the Honourable Member for Tanjong Karang, dia kata ini willing seller, willing buyer. Pertama, kita ada golden shares. Keduanya the Honourable Minister, saya minta pengesahan pada pagi ini, tawaran RM9.65 bilion ini adalah yang terkandung dalam perjanjian konsesi yang mana dalam perjanjian itu dinyatakan bahawa 12% pulangan kepada ekuiti. Kita terikat. Kita bukan hendak rampas daripada SYABAS. Kita berlaku adil, kita buat tawaran dan nilai tawaran ini adalah nilai tawaran yang terkandung dalam perjanjian konsesi iaitu 12% pulangan
kepada ekuiti. Ia berjumlah RM9.65 bilion. Maka, tawaran ini adalah tawaran yang termaktub dalam perjanjian. Ketiganya the Honourable Minister, kalau the Honourable Minister gagal untuk menggunakan kuasa golden shares itu, persuade dan meyakinkan empat syarikat, sepatutnya membenarkan kita untuk pergi kepada timbang tara antarabangsa. Kerajaan negeri telah menyatakan secara terbuka, kita akan terima apa juga keputusan timbang tara antarabangsa. Kalau timbang tara antarabangsa menyatakan RM9.65 bilion tidak cukup, kena bayar RM10 bilion. Kami akan bayar RM10 bilion. Kita ada kemampuan, asalkan industri perkhidmatan air ini mesti dikuasai oleh kerajaan negeri yang mewakili rakyat Selangor kerana kita tidak mahu kadar tarif ini ditentukan oleh syarikat-syarikat milik kroni UMNO dan Barisan Nasional. Keduanya, sekiranya timbang tara antarabangsa menyatakan bayaran balik ini lebih rendah daripada RM9.65 bilion, kita di negeri Selangor telah menyatakan, kita akan tetap memakai RM9.65 bilion. Adil atau tidak? Mengapa the Honourable Minister melengah-lengahkan lagi penstrukturan industri air di negeri Selangor? Mengapa the Honourable Minister hendak mempertahankan syarikat dan tidak mempertahankan rakyat? The Honourable Minister bertanggungjawab mempertahankan rakyat, bukan syarikat SYABAS dan empat syarikat konsesi. [Applause] Ini sebab Tuan Pengerusi, syarikat SYABAS menuntut kita hendak bayar RM9.65 bilion kerana itu termaktub dalam perjanjian. Syarikat minta berapa? RM13 bilion! Sedangkan kita hendak ikut perjanjian. Akan tetapi the Honourable Member for Tanjong Karang kata, "Tidak boleh. Kena ikut syarikat". Maknanya, the Honourable Member for Tanjong Karang juga mempertahankan syarikat dan bukan mempertahankan rakyat. [Applause] Oleh sebab itu negeri Selangor kalah kepada UMNO dan Barisan Nasional. Jadi the Honourable Minister, pada tengah hari yang baik ini, the Honourable Minister pun baru dilantik menjadi Menteri, jangan takut dengan the Honourable Member for Tanjong Karang. [Applause] Jangan takut dengan SYABAS. Honourable Member kena takut dengan rakyat dan takut dengan Tuhan. Kalau Honourable Member tidak patuh kepada akta yang telah kita luluskan dalam Dewan, Honourable Member juga melanggar keputusan Jemaah Menteri Kabinet, Honourable Member bertanggungjawab untuk menjawab kepada rakyat di negeri Selangor. Akhirnya Mr Chairman... [Interjection] Ini seorang lagi tauke. Saya berharap, bagi pihak Kerajaan Negeri Selangor dan rakyat Selangor, saya pohon supaya kementerian dapat mengemukakan satu jalan penyelesaian yang adil kepada negeri, rakyat dan juga keempat-empat syarikat konsesi air yang saya katakan tadi tetapi mestilah dalam kerangka Perlembagaan, undang-undang dan juga perjanjian yang telah kita tandatangani di antara kerajaan negeri dan juga Kerajaan Pusat serta keempat-empat syarikat konsesi ini. Jadi saya ucapkan terima kasih dan saya pohon penjelasan yang munasabah dalam perkara ini. Kita berharap pertelingkahan ini dapat dimuktamadkan dalam keadaan yang singkat demi kepentingan rakyat di negeri Selangor. Terima kasih, Mr Chairman.
Oleh kerana panjang sangat, masa tiga kawan lain telah diambil. Selepas the Honourable Member for Tebrau, the Honourable Minister menjawab. Sila, the Honourable Member for Tebrau.
Terima kasih, Mr Chairman. Izinkan saya mengambil kesempatan ini untuk menyentuh beberapa isu yang saya tidak sempat hendak sentuh semasa perbahasan di peringkat Dasar. Jadi, isu-isu yang saya sentuh dalam Kepala B.29 dan P.29 dan butiran yang ada berkaitan termasuklah Butiran 070500, Butiran 20000 dan Butiran 010300. Mr Chairman, saya hendak bertanya sedikit tentang kes-kes usik meter TNB yang Pusat Khidmat Ahli Parlimen sering menerima aduan. Daripada segi ini, beberapa soalan yang saya hendak minta penjelasan ialah selama ini, berapa kes usik meter yang telah dikesan dalam tahun semasa dan berapa kes yang terima hukuman tanpa
mencabar pihak TNB? Berapa kes yang dituduh ke mahkamah dan kadar kejayaan TNB bagi kes-kes yang dibawa ke mahkamah? Saya juga ingin mengambil kesempatan ini untuk bertanya, apakah SOP TNB untuk menangani kes-kes yang disyaki usik meter? Oleh kerana saya pernah terima aduan bahawa apabila pegawai TNB pergi ke premis yang tertentu, tuan punya premis tiada di tempat itu dan dia tunjukkan meter yang sudah dibuka kepada seorang budak yang hanya berusia 13 tahun. Kadang-kadang ditunjukkan kepada orang gaji yang langsung tidak tahu apa yang berlaku. Jadi, adakah ini boleh diterima dan adakah ini boleh menjadi saksi? Saya juga ingin faham, apakah formula yang diguna pakai oleh TNB untuk mengira pampasan ganti rugi yang harus dibayar untuk pihak yang disyaki mengusik meter? Ini kerana kadang-kadang, mereka seolah-olah dengan sewenang-wenangnya membuat kiraan tanpa berasas. Sebenarnya Mr Chairman, ramai daripada pengguna kecil yang diambil tindakan oleh TNB ini, tidak mencabar kepada mahkamah oleh sebab beberapa faktor. Pertamanya ialah jumlah yang dituntut ini bukan besar sangat dan kalau mereka bawa ke mahkamah, kos ke mahkamah lagi tinggi. Keduanya, mereka memang tidak ada resource. Saya juga ingin bertanya, adakah kerajaan menimbangkan untuk menubuhkan satu tribunal untuk membantu pengguna-pengguna kecil ini apabila mereka ada salah faham dengan TNB? Misalnya mereka tidak setuju dengan jumlah pampasan yang dituntut oleh TNB. Mr Chairman, isu kedua yang saya hendak sentuh ialah baru-baru ini, ada syarikat-syarikat yang menawarkan projek memasang solar panel di bumbung rumah untuk dijual balik kuasa elektrik ini kepada TNB dan mendapat pendapatan. Jadi, saya ingin tahu, setakat ini ada berapa buah syarikat yang dibenarkan untuk projek pemasangan solar panel itu untuk dijual balik kepada TNB? Kalau boleh, kalau ada lebih dan tolong, saya minta nama syarikat itu disenaraikan. Keduanya ialah saya juga ingin tahu apakah jangka hayat solar panel itu? Oleh sebab dalam risalah promosi yang mereka hantar, saya pun ada terima, ia kira sampai 20 lebih tahun boleh dapat berapa? Akan tetapi saya khuatir sama ada solar panel ini boleh tahan sehingga 20 lebih tahun atau pun tidak? Juga, saya ingin tahu, adakah kemungkinan TNB membatalkan projek pembelian balik kuasa elektrik itu dan menyebabkan kerugian kepada pihak-pihak yang sudah memasang solar panel itu?
Say after two years, ten years, they say we don't need it, we want to cancel this, we want to cancel the contract. So perhaps those parties who have already installed these cannot get their money back. The cost is not cheap. I see the brochure says more than RM10,000, and also whether there is a possibility that TNB (Tenaga Nasional Berhad) will reduce the rate of payment for the electricity bought back, causing losses to those suppliers, because they will calculate how much they can get in a month, and if that rate is reduced, they may in the end not get what they expected. If this project is something good and can bring benefits to the people, I would like to know whether the government, or banks, or TNB, are willing to provide loans to parties who wish to install. Perhaps because the cost is not cheap, there may be those who are interested but do not have the capacity. Is there a party willing to provide loans? I would also like to ask whether government buildings themselves are ready to install these solar panels as an effective measure by which we can reduce the net payment of this electricity cost? So if this can indeed be implemented, I believe many government buildings can install them and the electricity cost paid will then decrease. Finally, I would like to ask: a few years ago, the government launched the Green Building Programme (Rancangan Bangunan Hijau). So I would like to ask what the success rate of this Green Building Programme has been so far? Thank you, and I respectfully move to support.
Mr Chairman, please help. This is important.
One, two, three. Minister, we will reply at 2.30 pm, yes Minister? Yes, please, the Honourable Member for Kulai. After the Honourable Member for Kulai, the Honourable Member for Jerlun and the Honourable Member for Wangsa Maju.
Thank you, Mr Chairman.
Short ones only. Give the chance to two more friends.
Yes, 10 minutes. Yes, certainly. Thank you, Mr Chairman, for giving us the opportunity. Item 030000 - Water Supply.
With respect to the Honourable Member for Gombak. Please.
So far the Johor State Government has received RM230,000 every month from the state of Melaka, because the state of Johor sells 'muntah' water to the state of Melaka. Although our state of Johor is one of the sellers of 'muntah' water to Melaka, what is very surprising is that the water...
Air mentah.
Raw water, raw, but what I do not understand is that treated water in Johor has a tariff that is higher than the water tariff in the state of Melaka. I will give some examples. For water used for commercial and industrial purposes, the tariff in the state of Johor for the first 35 cubic metres is RM2.60 per cubic metre, but in the state of Melaka, for the first 50 cubic metres the tariff is only RM1.67 per cubic metre. For Johor, for water exceeding the first 35 cubic metres, the tariff is RM2.96 per cubic metre, but in the state of Melaka, the water tariff for 51 cubic metres to 100 cubic metres is only RM1.70. I think that although the state of Johor sells water to the state of Melaka, the people in Melaka can enjoy water services with a lower water tariff. So I think this is very unfair. So I hope that our Minister can help the people of Johor so that we can enjoy water services with a lower water tariff. So I think this is very unfair. So I hope that our Minister can help the people of Johor so that we can enjoy water at a more reasonable tariff. Apart from that, apart from selling raw water to the state of Melaka, the state of Johor also sells raw water to the country of Singapore, but at a different price. The raw water sold to the state of Melaka is priced at 30 sen for every 1,000 gallons, but the raw water we sell to the country of Singapore is priced at 3 sen for every 1,000 gallons. So I think this is a very different tariff or price, because when we sell water to our neighbouring country, the price is far too cheap, and I think this tariff or price has not been reviewed for 52 years. So I know that the Johor State Government has submitted a request to review the price at which we sell raw water to the country of Singapore. So I want to know here whether this ministry, our Minister, will allow and grant this request. The last issue is about electricity tariffs. I think recently we have read in the newspapers that some officials have said that so far our government has given a subsidy of 75% for electricity tariffs, and this subsidy cannot, with permission, sustain any longer. So I want to ask whether our ministry will review these electricity tariffs, and if these electricity tariffs are indeed to be increased, when they will be increased and how much they will be increased? I think, regardless of whether these electricity tariffs will be increased or not, after the implementation of the GST, I think the price we pay for this electricity will
will increase, because so far only the first 200 units of electricity used for domestic or residential purposes are exempted from GST, but for electricity used for industrial or commercial purposes, everything will be subject to GST. So that means after the implementation of GST, the price of electricity will increase by 6%. I want to ask whether our ministry has already carried out a study on what the effect and impact of GST on this electricity price is, and what the effect is on our industries and also our businesses? That is all, thank you, Mr Chairman.
Yes, the Honourable Member for Jerlun.
Thank you, Mr Chairman. Assalamualaikum warahmatullahi wabarakatuh. I am grateful to be able to take part in discussing and debating the Ministry of Energy, Green Technology and Water (KeTTHA). I will take up a very short time. First of all, Head 06500, the Kedah State Water Supply Plan. In the record here, the original estimated total cost of the project is RM158 million. Actual expenditure in 2011 and 2012 was RM32 million. The revised estimate for 2013 was RM18.7 million and the allocation for 2014 is only RM3.5 million. I ask the ministry to explain a little about which project this is? Is it that the Kedah State Government previously, or now, does not want to supply water any more? That is the first. Second, I was also very moved when hearing that several states, such as Pahang supplying water to Selangor, Johor supplying Melaka, Johor supplying Singapore, all have it, even at 3 sen per 1,000 gallons, but it has value. In Kedah we also supply water to Penang and also to Perlis, but supposedly on grounds of history, we cannot make claims.
So, he says, based on the world convention where when two neighbouring states use the same river channel, the state that does not have a water source does not quarrel about paying the state that has the water source. Mr Chairman, Head 11200 - Inter-State Water Transfer. The government has allocated RM155 million. Kedah has three dams. Kedah's dams are indeed used mainly for water supply for paddy. However, we realise that paddy actually does not need that much water. We have three dams, three large dams, namely Ahning, Muda and Pedu, which are used for channelling water to paddy cultivation projects. However, we must realise that these three dams have a catchment area of 1,267 square kilometres, and the storage area - the surface area - is 82 square kilometres. So very large. Then, these dams are able to hold 1.5 billion cubic metres. Whereas we only need 987 million cubic metres each year. So the surplus is what is channelled out through the Muda River all the way to Kuala Muda. So that is what the Penang State Government takes to be its raw water supply. Then, in Kedah we have - after corporatisation, we have Syarikat Air Darul Aman (SADA). However, before SADA was established there was also the State Water Management Board (Lembaga Urus Air Negeri, LUAN) which managed raw water and sold raw water to SADA. Whereas SADA is a subsidiary of the Kedah State Government. It should not have to pay for raw water. So, although we realise that the water at Pedu, at Muda Dam, is needed for paddy, this paddy is for food security. The government and the whole country have instructed us that they need rice from Kedah. We supply nearly 50% now. So, because under food security, we cannot plant anything other than paddy.
Mr Chairman, imagine - 100,000 hectares in Kedah that are planted with paddy at present. Let us say this area is planted with oil palm. If we plant 100,000 hectares of oil palm, with the average rate of fresh fruit bunches, good planting fruit (BTB), at the national average today of 20 tonnes per hectare, we would get an OER, that is, an oil extraction rate, of 18%. At a minimum, Kedah could earn a net of RM5 billion every year. A total of RM5 billion divided by the 55,000 households or families involved with paddy, they could each get RM9,000 a month. That is RM90,000 a year already. Whereas now, when they grow paddy, we get only RM32,000 to date. The target for 2020 is RM48,000. So, in view of Kedah's sacrifice, I want to ask the ministry, what is the ministry's view on the issue of Kedah's raw water supply to Penang, and also Kedah's raw water supply to Perlis? Because in Penang, the water treatment is carried out by a company that makes a profit, that is able to make a profit and pay allowances, pay salaries to workers, staff and so on, whereas the water obtained is free? So, I ask the government and the ministry to review this. If indeed I heard in the newspapers, it is said that the Honourable Menteri Besar of Kedah and the Honourable Chief Minister of Penang cannot sit down, cannot "talk", Penang says, "No talk!", because this is history. He says that from before, we have never paid. So I ask and plead on behalf of the state of Kedah that the ministry, also under the same Head 11200, "Inter-State Water Transfer", which has RM150 million, may perhaps not be in time next year, but for the coming years, consider Kedah's sacrifice. Calculate how much water is used. There is no need to count the water used for paddy in the AEDP area of Kepala Batas, Tasek Gelugor and so on; let us calculate how much raw water the Penang State Government takes, using the large meter at the intake, at the pumping station, and then give it to Kedah. There is no need to give even 3 sen per 1,000 gallons, perhaps 2 sen is enough rather than getting nothing at all. So, this will also help the Kedah State Government to develop a state that has long been known for poverty, because why? Because people associate paddy cultivation with poverty. I respectfully propose, and I support the budget given to this Ministry (KeTTHA). Thank you. Assalamualaikum.
Yes, the Honourable Member for Wangsa Maju.
Thank you, Mr Chairman. Good afternoon and greetings. Under the heading of the Ministry of Energy, Green Technology and Water, I want to touch on two matters, namely, number one, on Tenaga Nasional. This is a very high tariff, regardless of whether it is from Pakatan Rakyat or Barisan Nasional; earlier we heard a comment from the Honourable Member for Tebrau. In some places, TNB's tariffs have risen within two years, some by 100%, some have risen by 200%. Perhaps these are new tariffs already linked to new meters, which use new technology, namely digital. We hear that TNB was forced to appoint four suppliers for these new meters. Parti Keadilan wants an independent audit, because these are high bills involving millions of customers, and it should appoint the 'Energy Commission' to carry out an independent audit, because we have also heard that there is a new scheme, namely a knock-on effect, and we also hear that next year, 2014, TNB wants to raise tariffs again. As a People's Representative in the Federal Territory, we recently received a very high assessment tax, and all costs have also risen. How can the people remain concerned and be able to face the problems that are coming? Number two, Mr Chairman, is related to the calamity at Bertam Valley, Cameron Highlands, on October 23 this year. This is different from
Typhoon Haiyan in the Philippines. Typhoon Haiyan in the Philippines can be said, with permission, to be an act of God. Recently in a country in Eastern Europe, in Latvia, a roof above a supermarket collapsed, and 66 people died. The Prime Minister of that country described this as being categorised as a 'murder case' - murder, but in Bertam Valley, senior TNB staff opened the valve three times, and two died, many were injured, houses were damaged, cars were damaged, and property worth millions was damaged and lost. But if we follow the example of the Honourable Member for Kepong, when he wants to make any announcement, he uses his own jeep, and goes round Kepong with a loudhailer for one hour, and everyone in Kepong knows what he wants, whether it is a ceramah or anything else. So, that is why, what was the reason? TNB answered that they used sirens. But that is a large area. Perhaps people were not at home, were at work. Perhaps people could not hear, but TNB did not take proactive steps. As a representative of Parti Keadilan, we are not satisfied.
Number one, Mr Chairman, TNB should have dismissed the engineer who was in charge. Number two, charge that TNB staff with murder - this is not an act of God, and number three, if we follow the examples of other countries, the Chairman of TNB should have resigned. Thank you.
Mr Chairman, may I be given the opportunity?
[Bangun]
Yes, the Honourable Member for Bayan Baru.
Thank you, Mr Chairman, for giving me the opportunity to debate the issue in the Ministry of Energy, Green Technology and Water, for Purpose B.29, Item 010300 - Green Technology and Water. Just briefly, Minister. I want to know that under the Ministry of Green Technology and Water, the ministry has set up a body called SEDA (Sustainable Energy Development Authority) to promote the use of green technology. Throughout this time it has been full of many problems. I want to know, because people who pay TNB bills are paying subsidised funds (tabung) that are used by SEDA. So I want to know how much funding has been collected by SEDA since the Feed-in Tariff programme was implemented. So far, how much funding has been collected? The second question is, how much has SEDA paid to FiT holders since this programme was implemented? Please state the breakdown between solar, hydro and biomass. We know that solar is now very popular, but hydro and biomass have not received much response. So I want to ask how the ministry will implement more hydro and biomass projects, especially in areas of Sabah and Sarawak, where we have very good potential for small hydro electric generators. I have read about the small hydro programme that has been implemented in Sarawak, where with a small hydro generator they are able to generate electricity for a village in the interior. So we do not need to connect long grids to supply electricity. The third question is, how many FiT holder applications have been approved by SEDA? How much voltage has been used by individual holders? This is because many people want individuals to be able to participate in the FiT solar programme, but usually the quota is not enough for individual holders. On the day applications opened, the quota was exhausted within just one hour. However, there is still a lot of quota for non-individuals, especially companies, that has not been used or has stalled or is unable to deliver. So I think I would like to propose that the Minister give a larger quota to individual holders. The fourth question is, how many solar farms have been built by individual holders? How much voltage has been generated? I understand there is
...rancangan daripada kementerian untuk membuka solar farm di banyak tempat. Akan tetapi saya rasa tidak berapa masuk akal sebab ada projek-projek yang dicadangkan adalah untuk membuka tanah menebangkan pokok-pokok bukan solar farm. Kalau kita objektif adalah untuk promote teknologi hijau satu yang untuk environment, maka tidak wajar kita membuka tanah, menebangkan pokok tetapi bina solar farm. Lebih baik dikekalkan hutan-hutan supaya kita lebih menjaga alam sekitar. Akan tetapi saya juga hendak cadangkan kerana ada potensi-potensi yang besar di tempat-tempat lain seperti katakan kilang-kilang. Di atas bumbung kilang-kilang yang boleh diguna pakai untuk memasang PV, memang solar panel. Walau bagaimanapun kebanyakan kilang mereka menghadapi masalah kerana itu adalah satu capax yang cukup tinggi. Mereka tidak nampak return yang munasabah untuk masa yang terdekat. Jadi mereka tidak ada halangan yang cukup besar terhadap kilang-kilang. Akan tetapi kalau kementerian boleh berbincang dan facilitate satu tabung untuk kurangkan pinjaman loan dengan kaedah faedah yang rendah. Maka saya rasa kita boleh promote solar panel di kawasan-kawasan kilang terutamanya di kawasan- kawasan Bayan Baru. Di mana kilang begitu banyak, saya nampak selalu di atas bumbung mereka tidak ada apa-apa. Kalau semuanya digalakkan untuk memasang solar panel maka mereka boleh menjana electricity yang banyak untuk penggunaan kilang sendiri dan juga untuk menjana tenaga untuk TNB juga. Jadi ini adalah beberapa soalan.
[Bangun]
Ya.
Terima kasih Mr Chairman. Saya hendak tanya pandangan the Honourable Member for Bayan Baru. TNB apabila menghantar bil kepada kita dan sebahagian ada kutipan-kutipan untuk tenaga diperbaharui dicaj kepada kita. Bolehkah the Honourable Member for Bayan Baru bertanya Menteri, yang pertama bagaimana wang ini dikumpulkan? Adakah di bawah kementerian ataupun di bawah dijaga oleh Kementerian Kewangan? Kita hendak tahu berapakah jumlah sekarang ini kutipan yang telah pun dibuat? Itu pertama. Kedua kita Semenanjung dan juga Sabah dan Sarawak dikelilingi oleh laut. Tidakkah kementerian berhajat untuk melihat ombak itu sebagai salah satu alternatif bagaimana kita boleh generatekan kuasa di masa hadapan. Terima kasih.
Terima kasih the Honourable Member for Sungai Petani. Saya minta supaya soalan-soalan the Honourable Member for Sungai Petani dimasukkan dalam ucapan saya. Saya juga ada satu beberapa soalan seperti di Sabah dan Sarawak. Saya selalu dengar bahawa Sarawak memerlukan- tadi the Honourable Member for Kapar kata ada 12 empangan baru totalnya untuk dibina di Sarawak sahaja. Kita sudah ada satu empangan yang besar iaitu Bakun yang paling besar di dunia. Dulu apabila Tun Mahathir ingin membina Bakun dia kata kuasa yang dijanakan oleh Bakun itu cukup besar, terlalu banyak sehinggakan kena disalirkan ke Semenanjung. Sekarang kerajaan pula kata jana kuasa itu tidak cukup dan perlu bina empangan di Baram dan Batang Ai. Itu saya cukup confused. Jadi saya hendak tanya menteri, berapa keperluan, berapa megawatt yang diperlukan di Sarawak untuk in terms of demand, electricity demand di Sarawak? Berapakah tenaga yang dijanakan oleh empangan-empangan? Adakah ia cukup atau tidak cukup? Mengapakah kita perlukan empangan yang baru seperti Baram, Batang Air dan sebagainya? Kita tahu bahawa empangan-empangan ini dia punya life spent tidak panjang hanya lebih kurang 40 tahun sahaja. Selepas itu dia akan menjadi ada mendapan dan efficiency untuk jana elektrik itu akan berkurangan. Maka memang tidak berapa cukup untuk menjana elektrik untuk lepas lebih kurang 40 tahun. Jadi untuk itu, saya sokong apa yang the Honourable Member for Kapar cakap tadi, sebenarnya is not the best way to generate electric melalui empangan and is full of corruption. Kita tebangkan pokok dan merosakkan alam sekitar demi membina empangan, itu tidak munasabah. Saya hendak minta Menteri, adakah kita masih bertegas untuk membina 12 empangan di Sarawak? Dengan kata-kata ini sekian terima kasih Mr Chairman.
Ya mesyuarat bersidang dalam Majlis. Pukul 2.30 petang menteri menjawab ya. Terima kasih. [Majlis Mesyuarat bersidang semula] [Tuan Yang di-Pertua [Dato' Haji Ismail bin Haji Mohamed Said]
Baiklah Ahli-ahli Yang Berhormat mesyuarat ditangguhkan sehingga jam 2.30 petang.
[Mesyuarat ditempohkan pada pukul 1.00 petang]
[Mesyuarat disambung semula pada pukul 2.30 petang]
[Majlis bersidang dalam Jawatankuasa] [Deputy Speaker (Datuk Ronald Kiandee) mempengerusikan
Majlis bersidang dalam Jawatankuasa. Jemput Yang Berhormat Menteri untuk menjawab.
Terima kasih Mr Chairman. Kepada Ahli-ahli Yang Berhormat, pertamanya bagi pihak Kementerian Tenaga, Teknologi Hijau dan Air (KeTTHA) mengalu-alukan Ahli-ahli Yang Berhormat yang telah pun mengambil bahagian untuk membahaskan kepala-kepala peruntukan di bawah P.29 dan B.29 di bawah kementerian ini. Keseluruhannya begitu banyak, 16 orang semuanya yang telah pun membahaskan. Ada yang panjang lebar, ada yang auto point tetapi kebanyakannya memang ada kaitan dengan perkara-perkara di bawah kepala-kepala, butiran di bawah kementerian ini. Untuk perhatian ataupun sebagai ulasan kepada perkara-perkara yang dibangkitkan, saya tidak bercadang untuk menjawab satu persatu kerana banyak perkara yang dibangkitkan adalah berlapis ataupun berkali-kali dibangkitkan. Maka saya akan beri ulasan berasaskan kepada kepala-kepala isu tertentu seperti satunya, mengenai dengan IGEM. Kedua, mengenai dengan tenaga yang boleh diperbaharui ataupun perkara-perkara di bawah MGTC iaitu Malaysia Green Technology Corporation, dan SEDA, dan seterusnya perkara-perkara berkaitan dengan negeri seperti negeri Sarawak, Sabah dan negeri-negeri seperti Johor dan Melaka. Selepas itu, perkara-perkara yang berkaitan dengan tarif, perkara-perkara yang berkaitan dengan kemalangan di Cameron Highlands dan juga metering dengan TNB dan akhirnya nanti perkara-perkara berkaitan dengan bekalan air negeri Selangor kerana itu Ahli-ahli Yang Berhormat banyak menyentuh dan kebanyakannya berisi politik jadi saya mahu beri ulasan dan jawapan yang berasaskan kepada fakta keadaan sebenar, and my saudara, the Honourable Member for Gombak ini kerana banyak yang dibangkitkan tadi daripada segi fakta pun banyak yang boleh dipersoalkan. Barangkali mahu tunggu jadi Menteri Besar baru dapat maklumat yang tepat dan seterusnya...
Ha, itulah jawapan politik. Bagi fakta.
No, no. Nanti akhir-akhir [Ketawa] Yang penting, kita mahu cari penyelesaian kepada keadaan bukan sahaja di Selangor tetapi di seluruh negara kita mahupun daripada segi bekalan air ataupun bekalan elektrik, pembetungan dan seterusnya. Mr Chairman, antara yang telah pun berucap dan membangkitkan beberapa perkara yang banyak adalah semalam. Yang lain ini baru timbul tadi pagi, semalam kita sampai 10.30 malam, saya harap mahu tutup sudah semalam tetapi disambung lagi dengan lima orang, enam orang lagi pagi tadi tetapi the Honourable Member for Hulu Langat,
bekas mantan profesor antaranya pembangkang yang cukup balance dia punya pandangan, dia bekas saintis. Saya pun dahulu duduk sana dekat Bagan sama ini dua penggal, lapan tahun di sana. So pernah duduk sana, sini tiga penggal dan di sana dua penggal, so I know how you feel but I want to say that, the way we deal with this thing, we are very sincere. I want to find a solution…
...Kalau tidak, kena bagi sini.
[Ketawa] Itu lama lagi, belum tahu lagi. Kamu bilang, "Ini kalilah." Lain kali pun belum tahu lagi [Ketawa] Okey, pertamanya berkaitan dengan MGTC. Ada beberapa Ahli Yang Berhormat yang telah pun menyentuh perkara ini. Sejak penubuhan Malaysia Green Technology Corporation atau MGTC pada tahun 2010, pelbagai pencapaian telah dicapai dalam usaha membangunkan bidang teknologi hijau, dan MGTC telah dipertanggungjawabkan untuk merancang dan membangun kerangka dan melaksanakan pelbagai program dan inisiatif teknologi hijau di negara ini, MGTC juga bertindak sebagai pusat rujukan kepada pihak industri daripada segi latihan, keusahawanan, business matching, dan technology transfer dalam usaha memastikan bidang teknologi hijau sebagai pemaju ekonomi negara. Sememangnya banyak program yang telah pun dikendalikan. Annual Report pihak MGTC ini boleh diperoleh, dan saya boleh bekalkan kepada Ahli-ahli Yang Berhormat yang ingin dan minat untuk meneliti lebih terperinci mengenai peranan dan sumbangan. Antaranya ialah untuk memainkan peranan bersama dengan SIRIM dan Jabatan Standard dalam membangun standard-standard dan produk dan perkhidmatan hijau khasnya melibatkan perusahaan kecil dan sederhana menerusi pelaksanaan Program MyHijau dalam meningkatkan daya saing pengeluar dan pembekal tempatan di pasaran tempatan dan juga global dan program antaranya ialah MyHijau Procument, MyHijau Labeling, MyHijau Directory, MyHijau SME dan industri. MGTC juga telah dilantik sebagai industry lead body oleh Jabatan Pembangunan Kemahiran, Kementerian Sumber Manusia untuk membangun modul-modul latihan kemahiran berkaitan teknologi hijau yang akan dibangunkan oleh institusi-institusi latihan kemahiran. Selain daripada itu, MGTC juga telah membangunkan rangka-rangka ataupun framework perbandaran hijau, berlandaskan konsep perbandaran rendah karbon atau low carbon city, dan konsep yang dibangunkan secara kolaborasi dengan Jabatan Perancang Bandar dan Desa itu kini dalam proses pilot, melibatkan empat lokasi iaitu Majlis Perbandaran Hang Tuah Jaya di Melaka, Majlis Perbandaran Miri di Sarawak, Kampus Universiti Malaya, dan kampus utama di SK Skudai, Johor. Seperti mana juga yang dibangkitkan oleh beberapa Ahli Yang Berhormat termasuk the Honourable Member for Parit Sulong dan juga Ahli-ahli Yang Berhormat yang lain ialah berkaitan dengan IGEM iaitu International Green Tech and Eco Product Exhibition and Conference Malaysia.
Untuk makluman Ahli-ahli Yang Berhormat sukacita saya maklumkan bahawa sememangnya program ini sudah adalah tahun yang keempat ia dilaksanakan dan sememangnya pada kali ini dia dianjurkan sekali dengan Global Entrepreneurship Conference Summit sebenarnya dan yang pada mulanya Presiden Amerika Syarikat itu, Tuan Obama dijangka untuk hadir dan akhirnya Secretary Statenya yang telah mewakili dan sedikit sebanyak sebenarnya program itu yang sekali gus dilaksanakan pada tempoh IGM itu dilaksanakan telah pun KPI-KPI yang tertentu. Hanya saya katakan bahawa seperti the Honourable Member for Parit Sulong telah menyentuh bahawa berasas kepada laporan nampaknya ada mengurangkan sikit jumlah business transaction, dengan izin, yang telah pun diperoleh tetapi untuk makluman Ahli-ahli Dewan yang mulia ini, sebenarnya pada tahun kali ini bilangan pengunjung pun hampir sama iaitu 56,552 dan transaksi perniagaan adalah RM466 juta berbanding dengan RM1.3 bilion pada tahun yang lalu. Dari segi booth sebenarnya pun
ada menurun 467 saja disebabkan dua program yang di anjur bersama. Satu, Global Entrepreneurship Conference Summit mereka pun menggunakan space untuk booth tertentu, sekuriti yang tight juga pada waktu itu maka sekali gus dia mengurangkan kehadiran pihak awam. Namun itu satu pengalaman bagi kita dan kita yakin bahawa lahir daripada pengalaman sekali gus menganjur satu program antarabangsa, global. Kita boleh memperkasakan lagi IGM pada masa-masa akan datang. Keseluruhannya KPI adalah tercapai kecuali jumlah transaksi perniagaan tetapi dalam perkara ini pihak MIDA masih lagi meneliti, menyusuli apa-apa juga networking yang telah diadakan sepanjang perkembangan ataupun perjalanan IGM.
The Honourable Minister minta...
Soalan the Honourable Member daripada...
The Honourable Member for Hulu Langat, ya.
Boleh minta sedikit penjelasan contoh potensi daripada pameran itu, apa yang kita buat transfer ke Malaysia ini. Umpamanya katalah dari segi hybrid car, dari segi green technology incinerator ataupun apa-apa yang berkait dengan pameran itulah? Saya rasa banyak pameran yang diadakan.
Sememangnya pada waktu itu 40% daripada semua pameran pun daripada luar daripada dari negara kita dan pada kali yang pertama kita dapat sambutan yang begitu banyak. Bukan saja negara-negara ASEAN tapi negara di Asia. Saya melihat pada waktu itu, inovasi-inovasi dari segi pameran-pameran yang diadakan kebanyakan memanglah berasas kepada green technology dalam bidang power electricity, tenaga, dalam bidang air, dalam bidang pembetungan dan seterusnya kerana itulah tumpuan konferensi tersebut. Daripada saya katakan tadi RM466 juta nilai business transaction yang dijalankan sememangnya ini melibatkan juga teknologi-teknologi daripada buatan Malaysia sendiri dari segi inovasi, kreativiti, power check yang dikeluarkan yang sekali gus bergabung bersama dengan pihak-pihak pelabur daripada luar negara. Kalau Yang Berhormat lebih minat daripada itu saya boleh bekalkan secara bertulis jenis-jenis transaksi yang telah pun berjalan sebagai contoh-contoh tertentu. Tetapi kebanyakannya dalam bidang energy, anything, dengan izin yang pertaining to energy efficiency, penggunaan teknologi dari segi berbagai-bagai jenis LED. Satu daripada teknologi yang menarik dan saya melihat pada waktu itu ialah satu projek yang dari segi IP nya dari Australia, dia tangkap sunlight dan dia punya konsep during the day, dengan izin, tidak harus kita menggunakan tenaga daripada mahupun yang merupakan fosil. Dia tangkap matahari dan dia modify, translate dan magnify dan keluar sebagai lampu seperti ini tapi cahaya daripada langit sahaja. Okey, ini antaranya yang begitu menarik yang pihak kementerian bantu untuk memperluaskan sebagai boleh digunakan di tempat-tempat yang sesuai seperti tempat-tempat pelancongan, single storey houses, dengan izin dan seterusnya. So, saya boleh bekal senarai-senarai tertentu jika Yang Berhormat terus minat. Yang Berhormat daripada Hulu Langat antara mereka yang telah menyentuh perkara nuklear ini dan ada peruntukan sejumlah setengah juta untuk tujuan promosi dan pendedahan. Saya hanya mengatakan di sini berkaitan dengan tenaga berasaskan kepada nuklear, ini masih dalam tajuk perbincangan di peringkat kerajaan. Masih ingat lagi Ahli-ahli Yang Berhormat tiga tahun dulu mantan Menteri KeTTHA pernah juga memberi taklimat bersama dengan Kementerian Sains, Teknologi dan Inovasi (MOSTI) mengenai dengan potensi penjanaan tenaga melalui nuklear. Pada waktu itu, nampaknya sebenarnya dari segi Ahli-ahli Yang Berhormat termasuk Ahli-ahli daripada pembangkang neutral dia punya gambaran bagi pihak kami yang meneliti bahawa ada sambutan yang bukan menyeluruh tetapi yang menggalakkan dan berasaskan kepada kejadian di peringkat Fukushima, maka pihak kerajaan telah memberi tumpuan lebih banyak kepada pendedahan, potensi dan juga apa perkembangan terkini dari R&D dalam bidang keselamatan. Jadi selain daripada itu, belum ada perkembangan yang terbaru. Satu badan di peringkat di Jabatan Perdana Menteri yang disebutkan MNPC telah pun ditubuhkan
untuk terus bersama dengan KeTTHA dan kementerian lain untuk menerajui program-program promosi dan pendedahan. Pada masa yang sama difahamkan perundangan yang perlu jika kita hendak pilih hala tuju untuk membekal sebahagian energy mixed kita daripada sumber tersebut juga telah pun dijalankan dan dalam proses perhatian bagi pihak kerajaan. Ini sememangnya baik dari segi cleanliness, dengan izin, dari segi kos, dari segi sustainability, satu-satunya opsyen yang perlu dipertimbangkan oleh pihak negara walaupun belum ada keputusan muktamad dalam perkara ini. Saya, tiga bulan lalu menghadiri satu seminar antarabangsa di Rusia dan laporan di situ ialah selepas Fukushima, jumlah permohonan dan perancangan projek yang dijalankan oleh pihak negara-negara yang ingin tapping, yang ingin menggunakan sumber ini sebagai tenaga lebih banyak daripada minat tinggi lebih banyak daripada sebelumnya Fukushima terjadi. Perbincangan-perbincangan terkini dan R&D yang dijalankan adalah berasaskan kepada jenis penjanaan tenaga nuklear melalui nuklear sederhana dia punya saiz seperti 200 meg, 300 meg dan bukan yang ribu-ribu meg. Antaranya, misalnya dalam modul yang dikatakan 50 sampai 100 meg yang berasas kepada diangkat dalam baj boleh dipindah daripada kawasan satu kepada kawasan sini. Okey, teknologi ini masih muda tapi dijangka dalam tiga tahun dia akan menjadi amalan dan maka itu pihak kerajaan Malaysia perlu menelitilah walaupun belum ada keputusan dari segi dasar. Saya harap itu memuaskan the Honourable Member for Hulu Langat. Seterusnya saya ingin sentuh apa yang telah dibincangkan dimulai dengan tenaga dan dam, bekalan tenaga dan juga bekalan tenaga di Sarawak dan di Sabah. Dari segi the Honourable Member for Tuaran telah menyentuh beberapa perkara di bawah Butiran di sini, ada di sini. Kalau tidak nanti saya tukar tajuklah. Okey, banyak yang dibincangkan oleh the Honourable Member for Tuaran dan banyak terfokus kepada perkara SESB dan perkara-perkara berkaitan dengan SAIDI dan seterusnya. Saya hanya mengatakan bahawa usaha untuk mengurangkan gangguan kuasa elektrik di Sabah ini adalah satu usaha yang berterusan yang telah diberi perhatian oleh Kerajaan Pusat sebanyak-banyaknya semenjak tiga tahun ini khususnya.
The allocation given to reduce SAIDI, including the RM265 million for next year, is also included in these matters. Before that, cumulatively, some 460 million has been spent over a period of three years to reduce electricity disruptions. This problem in Sabah, Honourable Members, and especially Honourable Members from Sabah, is that we also need to examine the history of the development of the energy sector in Sabah. Although many efforts have already been carried out, in my view, perhaps better coordination and more careful study are very much needed. If we want to reduce, want to resolve SAIDI or reduce SAIDI, reduce these interruptions, we need to handle them from three perspectives of power generation. In terms of generation, in terms of transmission or delivery, and finally distribution. The problem in Sabah at this time is that the building capacity is about 1.2 million megawatts or 1,200 megawatts. The actual capacity, because every day I receive reports from SESB every day, twice a day, how much power is generated today, how much is the margin and so on? I can say that out of the 1.2 megawatts, about 880 is daily usage. Out of a generation of 900 megawatts out of that 1.2 megawatts, today's margin is between merely 30 megawatts, its margin, because of many outages that the IPPs must have under maintenance and so on. So we are talking about 30 or 40 megawatts out of actual generation, for the day is only taking about 4.4 margin. Okay, percentage, but this is the situation. However, with the efforts that have been carried out by the government, especially these three years, SAIDI has fallen from over 2,000 in 2009 to our target this year of 450 minutes, per consumer, per year. I am aware this is still high compared with Peninsular Malaysia, where it is about 60 minutes per consumer per year, and in Sarawak about 120. Our effort is to deal with this, but we have to deal with it at three levels - generation, then transmission and at the same time, distribution. I am saying that next year there will be 385. Almost 400
megawatts will come on stream, with permission, that is 100 from SPR and 300 from Kimanis Power, plus some more renewables. There is 10 megs from biomass and perhaps 5 megawatts from solar. Once it is done, next year we should have, we must have sufficient generation for only three years, three years, and then we have to build. A lot more needs to be done. We need- we need to connect transmission to the Southern Link, from Tawau back to Tenom, to Ulu Padas, to Sipitang and back to KK. The estimate is RM1.2 billion for transmission. Next, we need to deal with distribution. Because the distribution wires in Sabah, 80% are bare uncoated connectors. In Peninsular Malaysia, 85 to 90 are all aerial coated cables (ABC). That is Sabah. Touching trees, indeed there are short trippings. Even a monkey hanging on it trips it, because in the earlier effort at development, of course the allocation was insufficient or inadequate, so it is necessary. This estimate, if we want five years, four years, we want to change, we replace this too, is RM1.2 billion. So, we need to overcome it and the Federal Government- thank you, because Barisan Nasional won again in Sabah with two-thirds. So, this is the time. When if not now? This is the time to make change. However, we also need to be patient step by step. It cannot be completed all at once [Interjection] But I am confident that if everyone cooperates, including from the opposition, and at the same time we reduce wastage, increase energy efficiency, reduce theft, all of these, I am confident that by 2020, we are building a 30% margin like in Peninsular Malaysia now, 32%, 35%, 38% margin. In Sabah it is 5% today and we can do it, except with our government, and we have to cooperate. Yes, the Honourable Member for Kota Kinabalu...
Sandakan.
Eh! Sorry. Sandakan.
Don't just think of Kota Kinabalu, Sandakan is here.
[Dewan riuh]
Yes, Mr Chairman and the Honourable Minister. One problem we face is how the Minister has the law on how to stop this theft by these PTIs, how? Because we learn that such a large amount of power has been stolen by these PTIs. However, from the Honourable Minister's officers, because of this, the PTIs have no documentation. So, the government or SESB cannot charge these PTIs. So, I want to know what steps the Honourable Minister has to stop or prevent this very big problem?
Thank you to the Honourable Member for Sandakan. We are aware of this matter. However, overall, in fact, although there are indeed notable cases of this theft, including by the squatter areas, it is not that high. We estimate less than 3%, but if translated into power, into Ringgit Malaysia, it is still tens of millions. Among the problems is, first, this is the nature of theft. In fact, we cannot blame the SESB officers either. They once showed me a video in which they decided at 10 o'clock and 3 o'clock that several people went and reconnected. On the same day they could also reconnect, this in the squatter areas where there are either PTIs or local people but who are temporarily staying there. Because of the wire, our cable is bare, they do it like cowboy style. They take this wire like this, and they throw it, hang it over there. Hang it there, they can tap the wire, tap the energy already. But this requires cooperation from all parties. One, the local municipal council, that is, the Municipal Council, has to cooperate, then of course SESB officers' surveillance has to be, also has to be carried out, and our society also needs to be exposed to this matter. One, it is dangerous. Two, it is indeed illegal in terms of law. There are also several cases in which action has been taken and so on. I cannot give how many at this time, but I can give in writing to one Honourable Member who also touched on this matter. However, overall it is
compared with Peninsular Malaysia, there is indeed somewhat higher, but in a situation below 3% of theft. However, this we cannot tolerate and we need the cooperation of all parties including the JKKK (Village Development and Security Committee) and JKDB to report when there is evidence that someone has stolen energy through illegal connections and so on. The Honourable Member from Tuaran has also touched on it, indeed the parties involved in SESB management. The overall collection obtained by SESB in terms of tariffs collected is only able to collect 80% of the total operating cost. Even that is with the Central Government paying capital development (CAPEX) which is annual. If next year alone, it is 200-something, 262 million.
Not yet including special projects under SAIDI. At the same time, too, the diesel subsidy last year was RM560 million in Federal Government subsidy. Without that, indeed their income would decline even further, but it is difficult for us to say that this is SESB's fault or a management weakness. For the information of the Honourable Member for Tuaran and others, in fact it is a subsidiary of TNB. TNB determines certain KPIs for SESB management to achieve in terms of income and many other aspects. We at the Ministry, through the Energy Commission (Suruhanjaya Tenaga), also determine several KPIs for them to receive. For your information, for example, I think only recently, after almost six years, the salary scale for SESB was reviewed again, and their salaries compared with statutory bodies in Sabah were indeed very low.
[Bangun]
However, only just, only in the last two or three months, it was passed so that it fits, it was made equivalent to TNB. So this is among them...
Penjelasan.
...And I indeed acknowledge there is still room for improvement, but to blame them, because even there 90% are also local people. The engineers too, most of them are local children and they work hard, but with certain restrictions and the tariff the Honourable Member has touched on. The Honourable Member for Tuaran, closing the debate, said he hoped the tariff would not be increased, but that is among the reasons, the tariff has been almost 22 years without an increase, except in 2011.
The Honourable Member for Tuaran, please stand.
So, because the tariff is low, and the lowest in Malaysia, which is about almost 14% lower than Peninsular Malaysia, and that is also an obstacle to increasing income. We are in a review process, discussing this matter with the state government.
Clarification. Honourable Minister, I am not blaming individuals, the management of SESB actually. I would like to ask whether TNB is satisfied with the Honourable Minister saying he gives KPIs to SESB. Is TNB satisfied as a company listed on the stock exchange with the position of a subsidiary in such a situation, which depends on grants and subsidies from the Federal Government. That is one. Second, if TNB is not satisfied and the situation is indeed like that, will TNB not propose something to change the present situation? For example, can it continue in such a situation, after which we have the challenge of a tariff increase, then in terms of the power purchase agreement with the existing IPPs which indeed cannot be reviewed and so on. Please explain.
For the information of this honourable House, indeed TNB's situation is not easy, because the cumulative advances that TNB has given to SESB now have almost risen to RM1.8 billion to cover the gap in terms of income and in terms of opex
mentioned. So, indeed I don't have to inform you here, but they are open. If there is a bidder who wants to take over, they are indeed open in that situation, but in such a situation, as a state utility that needs to be protected, it is currently still under TNB's care, although TNB has in fact made a proposal for divestment. To be frank with this honourable House, as long as in our view it has not reached a level with high value, it is still in a state of insolvency at this time, able to recover only about 80% of the stated cost there. So it needs help, needs support for the sake of the people of Malaysia in Sabah from the Central Government. So if there are any proposals to submit to our ministry, we are open on this matter. Overall, I say that SESB too is actually in a situation where they have already made changes, in which strategic plans are needed. Also, McKinsey has just been commissioned by TNB and the Energy Commission to conduct an internal study on how else to make improvements in management and also in expanding their income.
[Bangun]
Honourable Member for Putatan, I want to get to the MTAHPI.
Thank you, Mr Chairman. I was actually waiting for the Honourable Minister's answer, although it was answered earlier overall that we cannot solve the problem overnight. I agree. The matter of Sabah's electricity generation is not a small matter. I am aware that the Honourable Minister's task is indeed heavy in overcoming the shortage of electricity generation in Sabah, but what I see, although the Honourable Minister says we cannot do it overnight, looking at the Honourable Minister's movements across Sabah, there are certain programmes that solve the shortage of electricity generation in Sabah. So my question is, has the ministry identified the types of programmes and where they are located and what? Is it through oil plants? Is it through solar? Is it through biomass, and have these places been identified, and have these projects begun to be built or implemented? That is my question, but I am actually waiting for that answer.
Thank you. Last round for...
Repeat the question that was debated, actually.
For the information of Mr Chairman and the Honourable Member for Tuaran, those who have debated matters relating to energy supply in the state of Sabah at this time, for example our diversification in terms of energy mix, we are also acting rapidly. At this time 67% comes from gas, diesel 14%, fuel oil 9%, biomass 4%, hydro 7%, and for the future, as I said earlier, 385 megawatts on stream by next year, and other efforts include Ulu Padas 180 megawatts per stream, 218. If we can kick off the project next year. The proposal of 300 megawatts in Lahad Datu using LNG gas, this matter must be decided within this one month because in terms of cost it is indeed very high. The Honourable Member for Tuaran indeed touched on this matter of coal. If you look carefully, this is the lowest. If 300 megs coal-fired, it is only about 1.2 b. If LNG is about 2.6b, if bring in the gas is about 3.2b. So we are studying these options, especially in terms of coal. Although...
Clarification, Mr Chairman.
...In the state of Sabah, NGOs- those NGOs like the good friend of the Honourable Member for Gombak, Wang Tat, who went around the world and eventually became a politician. So, you know, you just politicise all kinds of issues and not
genuine environmentalist. I'm sorry to pick on him. I know him. Including to take energy generation from coal from Indonesia. We are under the Asian RIP Agreements collaboration.
So, ini lah antara - meanwhile, renewable we will continue to push. Geothermal- they just got their FiT, 30 megawatt. Dari segi biomass, mesti ada kuota yang belum terpakai habis untuk biomass. Pada saat ini, biomass saya katakan tadi, baru empat megawatt pada tahun ini, tapi sebenarnya lebih daripada itulah kalau mahu lihat betul. I think this data is a bit outdated. Dari segi biomass, TSH plus di sana pun dapat 22 megawatt ya, potensi masih banyak tapi it is easy to talk about generating power from biomass. When it comes to acting on it bukan senang, millls are disperse everywhere. KPI for mills manager is to get as much oil, not to get money from the waste. So, it is not so easy tetapi kita welcome, siapa-siapa investors dan juga entrepreneurs yang ingin melabur dalam sektor tersebut. Mengenai dengan jual air ini…
Honourable Member, may I say a little, just one thing on this matter. Okay, regarding whether gas or coal, as just now. It is indeed popular for the people to say that coal, this coal, should not- and recently my friend from Sandakan, from Kota Kinabalu also told me, we pressure the government, do not build coal or anything like that. However, at the same time, when we use gas, we are not told how much subsidy the government must pay for the tariff later, because this gas is much more expensive than coal. So perhaps the Honourable Minister needs to mention this because the people themselves can understand, in terms of our choice, in terms of the energy mix just now. If we, coal, how is it, what is the cost and in terms of government subsidy that must be given, and if gas, how is it? Please explain.
Memang betul juga itu, barangkali dari segi memberi penerangan kepada pihak umum, kita perlu ambil kira elemen subsidi. Dari segi coal ini, arang batu, ia at world price, ia sekadar at world price. It almost reflectively of the cost that TNB level. It almost actually- it's world price, plus some margin for them, you know, but from the gas side, certainly this and also diesel, and so on, it is the subsidy element you know, very much, I don't- no need, I need to analyse a little for the state of Sabah, but certainly at this time, most of them are at 40, and if the market price is 44, 36 I think for MMBTU. So, it is indeed very large. For the people to appreciate their options, they need to be told the real cost of energy. Okay, I think that is enough for the state of Sabah, except that the Honourable Member for Tuaran touched on the Green Technology Council. There is RM1 million allocated for the state, and several Honourable Members also touched on this. This is for the state-level committee of the MTHPI Council. At present there is only one council at the Federal level. We plan, and it has been decided in the recent MTHPI meeting, to establish this committee at the state level. So it will be chaired by the Honourable Menteri Besar and at the same time will involve movements and programmes to promote the use of green technology. Furthermore, it will simultaneously work with the relevant agencies, especially the agencies of the Ministry of Education. The KeTTHA side, as announced in the Budget Speech, has agreed to establish a foundation that we call "Yayasan Hijau Malaysia" or YAHIJAU. The purpose is to work together with the MGTC, namely Malaysia Green Technology Corporation, to create exposure on the use of and green lifestyle among youth, at school level, among women, at grassroots level. This is because we believe that to strengthen the spirit of energy efficiency- switch off the lights, don't throw rubbish, don't waste water, we have to start with the young people. That is the purpose, and it will simultaneously work with the MTHPI at the constituency level.
Ahli Yang Berhormat seterusnya daripada Sarawak telah menyentuh juga mengenai dengan perkara-perkara berkaitan dengan air dan juga berkaitan dengan dam di Sarawak. Seterusnya saya hanya mengatakan di sini bahawa air di negeri Sabah dan Sarawak adalah sebenarnya di bawah jagaan negeri masing-masing. Akta WASIA tidak berkuasa di negeri Sabah dan Sarawak, kerana kedua-dua negeri telah pun dikecualikan. Dari segi bidang kuasa akta WASIA kecuali mereka sendiri setuju dan memohon supaya Akta Pengurusan Perkhidmatan Air itu dipanjangkan kedua-dua negeri. Maka dengan itu peranan Kerajaan Persekutuan dalam kedua-dua negeri adalah sekadar sebagai tempat pinjam duit, almost like that, yang minta pinjaman dan sering kali juga minta perkara seperti dana, grant. Maka kita tidak ada kuasa keseluruhan untuk memantau atau pun menyelaras berkaitan dengan air. Mengenai dengan dam ini atau pun empangan yang disentuh perkara-perkara seperti ini juga, bagi kuasa-kuasa berkaitan dengan empangan di negeri Sarawak, ia sekali gus di bawah bidang kuasa kerajaan negeri. Ini kerana empangan ini ada tiga jenis sekurang-kurangnya iaitu empangan tenaga, empangan untuk air, empangan untuk irrigation. Seperti di Semenanjung juga, kecuali empangan untuk perihal air sebahagiannya empangan yang berkaitan dengan bekalan tenaga, ia di bawah kawalan KeTTHA, kementerian ini. Akan tetapi bagi di negeri Sabah dan Sarawak, ia sekali gus adalah di bawah kuasa negeri masing-masing. Mengenai dengan perkara yang disentuh oleh Yang Berhormat Wangsa Maju, kawan lama kita, tapi dia sudah pergi lari sebelah sana. No way, he said, dan juga beberapa Ahli Yang Berhormat yang lain yang telah pun menyentuh berkaitan dengan perkara empangan di Cameron Highlands, saya telah pun jawab ini dengan panjang lebar, dua kali di Dewan yang mulia ini. Sekali lagi saya mahu menyentuh bahawa dalam apa yang terjadi pada 23 Oktober itu, tindakan-tindakan yang telah dibuat oleh pihak TNB, sebenarnya telah memenuhi SOP yang telah ditetapkan dalam perkara ini. Hanya pada waktu itu hujan yang begitu kuat sekali, dalam dua hari itu, kira-kira 70 milimeter dalam satu hari, dan coverage di sana hanya sekadar untuk satu bulan adalah kira-kira 280 milimeter, berbanding 300. So, you talking about almost berapa, it's very basics, it is almost 30% dalam satu hari air turun pada pertengahan malam 22 hari bulan itu, dan awal 23 Oktober. Dengan itu air begitu cepat meningkat. Seperti mana yang saya katakan…
Yang Berhormat Wangsa Maju Yang Berhormat.
Jangan dulu. Biar saya kasi jelas dulu. …Air meningkat, dan mengikut SOP, apabila ia sampai kepada 3,504, dia mesti activate semua, termasuk makluman kepada pihak polis, kepada pihak bomba dan seterusnya. Sebenarnya ketinggiannya 207 itu, dia sudah pasang siren. Yang Berhormat mengatakan, orang tidur pun macam mahu dengar siren? Sebenarnya itu empangan, kalau Yang Berhormat pernah ke sana, ia tidak juga jauh daripada kawasan pekan kecil di situ, okey tetapi masalahnya sebenarnya, satu air dengan cepat naik; kedua, lumpur yang turun. Masalah di situ tidak ada satu pihak yang boleh dipersalahkan. Satu- hujan kuat dan cepat air naik. Kedua, lumpur daripada upper stream, kerana orang buka tanah, tanpa ikut peraturan, maka lumpur turun saja. Itu satu. Di bawah sana pula, di bawah empangan sana, orang buat rumah di atas sungai- bukan sungai lah, macam parit saja. Akan tetapi kalau hujan kuat, memang ia akan banjir juga.
Sekolah pun ada di sana, sorry to say lah, satu pasar umum pun ada di sana. Banyak bengkel dan bila dikeluarkan sebenarnya mereka lepaskan satu inci sahaja daripada di situ, pada first run itu pun lumpur turun bukan lagi air turun tetapi lumpur turun. Air bertakung lagi di situ menjadikan mangsa yang terjadi. Mengenai cadangan Yang Berhormat Wangsa Maju supaya pegawai-pegawai engineer kita di caj dengan membunuh dan seterusnya saya rasa itu luar biasa dari segi perundangan yang ada di Malaysia. Mereka telah mematuhi SOP yang ada dan
langkah-langkah diambil, namun tidak mencukupi untuk menyelamatkan keadaan waktu itu. Selepas saya lawat di situ, saya telah minta TNB revise itu SOP dan sekarang ini dalam stage bersama dengan Majlis Keselamatan Negara (MKN), kita telah kurangkan kepada 3,000 bukan lagi 3,004 kaki. 3,500 ia masih lagi activate warning system sebelum pun 3,504 according to the previous SOP.
[Berdiri]
So we tell them berdasarkan apa yang perlu dilaksanakan, dan di situ semua pihak perlu dipersalahkan kerana dari segi yang membuka tanah, dari segi enforcement, dari segi enforcement downstream, di bawah kerana mereka semua – saya melihat sekolah pun duduk di situ. Jadi siapa yang dipersalahkan?
Terima kasih.
I think we need to work together to resolve the matter.
Terima kasih Yang Berhormat Menteri, kawan baik. Akan tetapi ini perkara tidak boleh memperkecilkan sebab apa, ini empangan atau dam di Cameron Highlands sudah dibina lebih kurang 30 tahun. Walaupun hujan lebat, apa sebab tidak ambil langkah yang lebih proaktif dan juga saya ingat kalau panggil TNB buat siasatan sendiri memang tidak boleh. Mesti panggil audit dari luar TNB. Terima kasih.
Ya, pihak kita sedar juga dalam perkara ini dan itulah untuk makluman sebagaimana saya bentangkan pernah di Dewan yang mulia ini, minggu lalu bahawa pihak Jabatan Perdana Menteri telah mengarahkan supaya satu badan kawal selia harus ditubuhkan untuk tujuan mengawasi semua empangan di negara kita ini. Ini termasuk dari segi teknikal perspektif seperti dari segi engineering kerana saya katakan tadi kira-kira 30 lebih jumlah empangan. Sebahagian adalah empangan tenaga, empangan air, empangan irrigation. Untuk makluman, kebanyakan mereka ini sudah tua-tua dan perlu diawasi dari engineering dan seterusnya. Jadi perlu satu badan kawal selia. Pihak Kabinet akan mempertimbangkan perkara ini dalam masa yang terdekat kerana PEMANDU telah mengadakan satu lab dan cadangan-cadangan telah pun dibentuk untuk tujuan pengawalan dan juga badan pengawal selia berkaitan dengan empangan-empangan di negara kita hari ini daripada terletak di dalam tangan jabatan-jabatan tertentu yang tidak diselaraskan. Terima kasih. Saya ingin terus maju. Ada beberapa lagi perkara sebelum saya bergerak kemuncak iaitu perihal air di negeri Selangor. Satu lagi perkara yang telah pun...
Yang Berhormat Menteri. Dari sebelah sini depan kawan, Yang Berhormat Bakri hendak tanya satu soalan.
Yang Berhormat Bakri tidak ada ucap.
Tadi tidak sempat, berkenaan TNB. Pendek sahaja, saya hendak minta penjelasan...
Apa yang pendek? You pendekkah, I pendek, you bercakap..
Tidak apa, soalan yang pendek. Yang Berhormat Menteri pun boleh jawab pendek sahaja. Di sini saya ingin meminta penjelasan berhubung, adakah bidang kuasa pemasangan dan penjagaan tiang lampu dibahagikan kepada tiga agensi-agensi iaitu TNB (wait, later, repair), PBT (needed, repair, wait) dan Kementerian Luar Bandar? Adakah TNB mempunyai kuasa muktamad untuk memasang dan membaiki? Pendek sahaja. Minta penjelasan, jawapan.
Entah siapa punya, nomenclature Yang Berhormat Bakri punya kah, you belajar daripada yang jahat-jahat sini. [Laughter] Tidak jahat lah, yang mereng sikit.
Saya pernah menjawab soalan ini bahawa di kawasan perbandaran atau pun di kawasan di mana kuasa itu adalah di bawah kawasan TNB maka sememangnya TNB, tanpa tunggu pun, adalah badan pengawal selia serta juga badan yang menjaga infrastruktur tersebut. Mereka ini dikawal selia oleh satu Regulator Energy Commissions. Luar bandar ini seperti mana yang saya katakan kalau di negeri-negeri yang lain ini adalah kawasan-kawasan yang baru, kawasan-kawasan yang belum lagi mendapat penjanaan dan itulah untuk pembinaan infrastruktur tersebut, ia dilaksanakan oleh pihak Kementerian Kemajuan Luar Bandar dan Wilayah (KKLW). Selepas siap itu baru ia diserahkan kepada pihak TNB atau pun SESB atau SAB kalau di Sarawak. Mereka tidak terlibat untuk membuat apa-apa pembinaan infrastruktur di dalam kawasan yang telah pun menerima penjanaan dan perkhidmatan daripada TNB, SESB atau pun SAB. Kalau ada, normally pernah dikatakan dahulu bahawa local government pun ada kuasa pasang, harus ini tidak wujud. Tidak wujud kerana ia memang kawasan perbandaran adalah di bawah kuasa, bidang perkhidmatan TNB. So kalau ada yang normally sila beritahu sama kita barangkali kuota yang sudah tua. Betul-betul lah belum lagi dikawal selia. Okey. Yang Berhormat Gerik itu adalah perkara yang dibangkit begitu spesifik sekali. Namun maklumat yang saya beri maklum adalah berkaitan dengan SAIDI di kawasan Gerik adalah sebanyak 8.6 minit pengguna satu tahun. Bagi kawasan yang sedang membangun tahap ini adalah setara sebenarnya. Saya katakan tadi kira-kira 60 di seluruh negara sama setaraf dengan UK dan Australia. Demi memperkukuhkan lagi sistem pembekalan elektrik di kawasan Gerik terutama di Pengkalan Hulu. Pihak TNB telah mengambil tindakan-tindakan seperti berikut:- (i) merentang kabel voltan tinggi 11kV dari pencawang pembahagian utama Banding ke pencawang elektrik ke Belum Rainforest dengan kos RM150,000 yang telah disiapkan pada pertengahan November 2013 yang lepas; (ii) memelihara pencawang masuk utama Baling dengan kos RM5.3 juta dan dijangka siap pada bulan Februari 2013; (iii) meningkatkan keupayaan pencawang pembahagian utama Gerik dengan kos RM5.72 juta dan dijangka siap pada bulan Julai 2014; dan (iv) merentang talian voltan 33kV yang kedua dari pencawang masuk utama Baling ke pencawang pengagihan utama Pengkalan Hulu dengan kos RM1.90 juta dan dijangka siap pada bulan Ogos 2014. Saya harap Yang pihak Berhormat Gerik mengambil perhatian dan apa-apa perlu susulan, sila maklumkan kepada pihak kita. Yang Berhormat Paya Besar, minta membantu dalam mengatasi masalah bekalan air di negeri Pahang. Saya maklumkan di sini bahawa sememangnya perkara seperti juga di Selangor nanti, saya akan sentuhkan bahawa perkara-perkara mengenai dengan NRW ini adalah perkara-perkara yang di mana negeri-negeri telah migrate kepada Akta WASIA, maka mereka sebenarnya yang mengendalikan ini. Sememangnya pada tahun yang lalu, belum masuk tahun ini beberapa negeri termasuk negeri Pahang adalah antara negeri yang memang begitu tinggilah daripada negeri saya sendiri seperti negeri Sabah yang melebihi juga... Mana Pahang, ia 53%, 52.9%.
Ini adalah satu sasaran bagi negeri-negeri yang sudah migrate kepada Akta WASIA kita, dan pengurusan sekali gus di bawah pengurusan kerajaan negeri, dan kami sekadar menjadi regulator di dalam perkara ini khususnya di dalam bidang tarif. Akan tetapi sememangnya, saya difahamkan ada satu kajian sedang dijalankan khas untuk negeri Pahang untuk mengatasi masalah berkaitan dengan NRW di peringkat negeri Pahang. Yang Berhormat Tanjong Karang dan sememangnya Yang Berhormat Gombak memberi perhatian khusus kepada perkara-perkara yang berkaitan dengan negeri Selangor yang saya akan ulas sekejap lagi.
The Honourable Member for Bukit Katil spoke about the meter. Sorry, many Honourable Members spoke earlier, so there are some slips here and there. And the Honourable Member for Kulai, the other one. Regarding this metering, I only want to say here that the meters being implemented are, in part, at the first stage, and many complaints have already been received concerning accuracy. I have taken note of this matter and have asked the Energy Commission (Suruhanjaya Tenaga) to analyse all the complaints submitted by customers, including those from several Honourable Members, together with SIRIM. I have also asked them to appoint another expert reference from the universities to examine and provide a full report on whether the meters installed are valid in terms of their accuracy and have met international standards and the standards set by SIRIM. However, there are still far too many complaints. So we will continue to carry out certain investigations. My own interpretation, with permission, they use to make a meter that is not accurate. When the meter is accurate, then the actual energy is reflected. I am aware. Including in Sabah, there was also this, ten years ago, when I was still sitting over there, because a contractor, not SESB, yes, but a contractor said, "Datuk..." At that time I was not yet "Datuk" - "Honourable Member, do you want a fast meter or a slow one?" This is because the contractor, this is not an officer, not SESB officers or technicians, but certain contractors. It seems it could indeed be done. But with the new technology, this new meter, the opportunity, the chance to interfere with the meter, is almost zero. That may also be why, because the meter is more accurate, the picture in terms of cost or actual usage increases, and that is what the complaints are. If there are still specific complaints from the public, I am ready to take this matter to a higher level in terms of resolution. We do not want a meter that malfunctions, that is not correct, but where it has been scientifically proven that it is correct, then we also need to adjust to accepting technology like this. There are also suggestions that we could monitor this meter through cameras and so on. Our side at the Ministry of Energy, Green Technology and Water (KeTTHA) is studying this existing technology, which is used in countries such as Korea. They install the meter together with the camera. There is no need to enter the house or go and disturb. It can be viewed from outside, and it can capture and read, and this will be even more accurate with the existing system. So for the Honourable Member for Gerik, that is my comment on this matter. For those so specific as already touched on by the Honourable Member for Bukit Katil. The Honourable Member for Bukit Katil is a clever person. Regarding the same matter of energy tariffs. For information, indeed the cost of fuel has already increased, and the government's effort to reduce subsidies is an ongoing effort. Regarding energy, there is no final decision yet, although TNB has already suggested that they be considered for a determination in this matter. It has not yet reached the stage where there is a final decision. But the effort to reduce subsidies is also to reflect the cost of capital and also the cost of labour at the utility level. This also needs to be taken into account in studying the existing energy tariffs. But what is important is that the government will ensure that low-income groups continue to be protected so that the existing assistance will continue, and we do not want any increase, if there is one, to result in a decline in the standard of living of those on low incomes. At this time, concessions are given to them. Consumption up to 200 units, and likewise 200 to 300 units, and this group needs to be protected from any increase, if there is one, as requested by the utility. That is all I can answer on that matter because this...
Mr Chairman, the Honourable Minister, a little on this tariff.
The Honourable Member usually does not talk about tariffs [Laughter]
Although approval has not yet been given, TNB has already split, or set up, five bands. So in effect, tariffs have also gone up indirectly. It is true that the first 200 units are okay at 22 sen per kilowatt hour, but after that, up to five, say more than 350 kilowatt hours, multiplied by 45 sen, that is what makes it too high. Thank you.
As I said earlier, as a utility, they can certainly make proposals, but I said earlier that discussions are still ongoing and no final word has been reached until the Minister of Energy, Green Technology and Water makes any announcement, okay? But the request from both SESB and TNB, as you already know, they have applied. So this is under consideration. When the consideration is complete, then it will become final. There is no final decision until a decision is made. The last thing I want to touch on, Mr Chairman, is regarding...
Mr Chairman, one, last. I very much want an explanation regarding the LEO building, how much savings we can get. Is there information or not?
Yes, but not detailed with certain data. I will supply it to the Honourable Member in writing. This is because there is indeed an increase under MGTC and so on, but I need further study beyond that. So far, response is still moderate in this regard, and they want wider incentives to enable those goals to be achieved.
Honourable Minister, thank you, Mr Chairman. I raised specifically non-revenue water (air tanpa hasil), which I think is a fairly significant and important issue for us to address. I have not yet heard the Honourable Minister's specific answer regarding this matter.
Honourable Member for Bukit Katil, I touched somewhat earlier on the position in other states, and indeed this is a matter that our side at KeTTHA wishes to study. Among the states with high levels is Kedah. Kelantan is indeed at 52%, if it's the last quarter. Negeri Sembilan also exceeds the 36% level, Pahang exceeds the 50% level, Sabah and Perlis also exceed 50%, and Selangor is at 3.46%.
I say that for states that have already migrated to wasiah, responsibility for infrastructure at that level lies under the respective state, although they usually apply for allocations for CAPEX as loans from the state governments. For states that have not yet migrated, SPAN controls, and through allocation applications from the states, we only assist. Indeed, this is a source in terms of efficiency of water use that can be tapped emerging locally. In Sabah, which is said at this time to be at a rate of 52%, the amount of treated water, when distributed, half of it does not reach homes. Therefore there is no revenue. So one source to add supply is indeed through replacing certain pipes. But this too we cannot harvest or catch. We can obtain it in a short time, and it requires so much allocation. Second, the process of conversion and so on. In several states, the pipes have no mapping and no central database. Sometimes they are under drains, in the middle of roads and so on. So this is a major work that we are trying to do at KeTTHA level, using technology already used in Korea and other countries, for pipe mapping
to know the exact locations of certain pipes so that efforts to repair pipe conversion can be carried out. I think from next year we hope the focus to reduce NRW, because it's a waste, can begin, based on the government's capacity as well as applications from the states that have applied. For information at this time, I think according to the data I have, only three states are below 25%, namely Johor, Labuan and Pulau Pinang. The rest are all above 34%. So we can indeed harvest, as the Honourable Member for Bukit Katil says. We could harvest a lot more water simply by ensuring that non-revenue water that is lost is reduced, but the financial estimate is indeed very large. In terms of asbestos pipes, it is still a major focus for reducing NRW...
[Bangun]
Honourable Minister, just- I thank you for the answer just now, but I think it's not only KeTTHA that should play a role. I would like to propose to the Honourable Minister and the ministry to study the latest report issued by the Asian Development Bank, which discusses the challenges of reducing non-revenue water. This is because I think NRW is a widespread waste, and there are various proposals that can be implemented without requiring large expenditure, apart from infrastructure problems, so that NRW can be overcome and waste can be prevented. Thank you.
The Honourable Member for Tebrau also stands.
Mr Chairman, earlier I asked about the issues of TNB meter tampering and also regarding solar panels. So if there is no immediate answer, I request at least a written answer.
Detailed information. Overall, I said earlier that in terms of renewable energy operated by SEDA, our aim is that by 2015, renewable energy should reach 6%, and 11% of all energy mix by 2020. At present, SEDA has approved projects that can receive FIT support of about 550 megawatts, and only about 120 megawatts are in operation. For information, solar is over-subscribed, with too many applying for FIT. However, there are two types. One is in the form of a farm. The second type is on buildings, factories or industry, and one for own homes. For own homes, the quota is still available because this is small-scale, and SEDA has obtained three banks ready to finance it if a customer wishes to install solar on their own home. We do double metering. In the day they sell power to TNB or SESB, and at night they use it, and the contract covers what they sell and buy. This is very popular, and we indeed plan to continue this. For industrial buildings, the exact amount I cannot give you because I've just lost my slip here, but I can supply it in writing. As for proceeding with solar farms, we are also cautious, because if we say solar energy is green, but we cut down trees to install solar farms, then maybe the impact is almost zero. We will take note of comments such as just now. Regarding technology and so on, this is still under an open market situation, but for bank financing, I think they determine what model they are ready to finance, and SEDA will test several suppliers, and there is a list we can supply of which suppliers have been tested for the technology they use. Technology is moving very fast in this field. There is a glut, for instance, in China, but if you go for the- we choose the big brands, it shouldn't go wrong. Only efficiency differs, and this is also related to the price of the panels
mentioned. If the Honourable Member or anyone interested, SEDA can give a briefing on the programmes available in terms of solar energy use and the programmes available under the FIT programme...
Honourable Minister, an explanation.
Not yet reached Selangor.
NRW.
Be patient first. I will touch on Selangor later. NRW.
NRW Selangor.
Because Selangor's is not so simple. You do not allow tariffs to rise, so how do you pay for NRW? [Interjection] Johor's water is Pulai, isn't it? This was also touched on by the Honourable Member for Tuaran. He said the area exporting water to other areas does not have to pay. However, that matter is within the state, and the Sabah states' matters are internal because water management is at state level. Likewise, the Honourable Member for Jerlun also touched on water from Kedah that is drawn by the state of Pulau Pinang. He said this should not be free. This is an inter-state matter. The overall view of KeTTHA is that both states should sit down and discuss, and KeTTHA can act as mediator.
But our side does agree that because we look after the river, we must not let it go, so that the water catchment is preserved, and you take water from my river free of charge. I think there is a basis to discuss and determine the rate. This matter has already been applied for during Kedah's time under Pakatan too; the Menteri Besar had applied to the Chief Minister of Pulau Pinang to request payment. Okay, so I think the present State Government of Kedah has a basis to follow up, because this has happened from before. Indeed, some say the Penang Government is using the concept of building values, but reasonable values usually mean being able to bathe, fish, or cross as a means of transport. But if you make money out of water by drawing the water, it is included in what is called reasonable values, if it is under the land ordinance, repairing reserve, and all these things. Okay, so I let you know that both states, because while Kedah was under Pakatan, they had written letters to the Chief Minister of Penang to ask for payment, and KeTTHA can also act as middleman in this matter, even though this is a matter for the state government...
Mr Minister, may I interject briefly. I see that this issue is important. So thank you to the Honourable Minister for saying he can act as middleman, but if possible, that is, give a little first to Kedah. Is the Federal Government holding it, or how? Thank you.
Under the existing act, raw water is under the state when it is treated; then it falls under the distribution act, except if given a concession under that. So we buy legally. I have written to the Most Honourable Chief Minister of Pulau Pinang, and about this matter, we are ready to act as mediator if necessary. The Honourable Member for Kulai, regarding this water to Melaka, is a matter between two states, but keep in mind that the water quality in Johor is not as good as the quality in other states. So treatment costs are high. Okay, most of the- according to scientists who have informed me, treatment costs for Johor water are higher than in other states.
Okay, so when it is sold to Melaka, indeed it may be at a premium price, but it is sold to consumers at a lower price because it is mixed with water treated in Melaka state itself. So it is normal: just Johor water, but mixed with water already filtered by Melaka itself and so on. So is that cost reflective of our cost of treatment? We think that is the actual situation. Regarding the Singapore matter, there is no new proposal yet to review anything, because the agreement still remains as it is. Okay, finally, Mr Chairman...
Request a little explanation.
Sudah habis.
I want to ask the Minister a little. Just now you mentioned the agreement between Johor and the Singapore Government. How long is the period of that agreement? Because so far it is already 52 years, but the rate or price of raw water has still not been reviewed up to now. So I want to ask, until when is that agreement? This is not me; this is actually a request from the Johor State Government. They ask that the Federal Government may review the rate of raw water that we sell to the Singapore Government.
I understand that too, but this agreement is a national-level agreement involving diplomacy. So in discussions from time to time between the Prime Minister of Singapore and the Prime Minister of Malaysia, this has indeed been raised from time to time, but the last time it was raised, I think three years ago, and some arrangement, *dengan izin*, was indeed certified and agreed upon. I think any new matter in this regard must be brought up at the bilateral level because it is not merely between states. So the ministry needs to refer to the highest authority if there is any concern from the people of Johor regarding this matter. Alright, finally I would like to address those with very specific questions and enquiries. I will answer them in writing, and at the same time we will discuss and provide important information, where the briefing is needed, particularly relating to green technology. We are ready to discuss those matters. Alright, regarding Selangor, I know the Honourable Member for Gombak, the Honourable Member for Bukit Katil, the Honourable Member for Hulu Langat, and the Honourable Member for Tanjong Karang have also raised these matters. I want to say here that, to begin with, many of the matters raised by the Honourable Member for Gombak are inaccurate in terms of information, and I would like to correct what I said just now, especially on the matter of water supply and Selangor's water situation. I can acknowledge that it is in a state of crisis. For the Honourable Member's information, I would say here that what was mentioned earlier in terms of information on production, and the claim that the information available is at a rate exceeding 3.5% in terms of margin, is not correct for the current situation. For example, in July, the quota had not yet been reached this time. Okay, in the most recent period, November, production from 34 plants was only 4,395 million max litres, and production from 24 small plants was 273 million mlg, and total demand, or what can be distributed, was 4,686 million max litres. So for 1 November, this is week by week, mostly only a 1% margin, and for 18 November, only a 0.38 margin. This figure was disputed, it was said to be incorrect. This is based on information provided by the treatment plans of those three. Okay, there are four there: SYABAS, Puncak, of course we have ABBAS and SPLASH. ABBAS and SPLASH are partly owned by the Selangor State Government. So the information provided is indeed accurate information, because it is the basic information for claiming payment from SYABAS, and based on that data, I expect it may actually be a bit higher than real, and really, because they want large payments, based on the agreed payment. And SYABAS,
SPLASH – the Selangor State Government holds 30%, and ABBAS is 90% owned by the Selangor State Government.
So, the data they have released is indeed correct, because it is the basis of their claim to request payment from SYABAS. So, I would like to say that the data currently available, which is collected through SPAN and through SYABAS and also those three treatment companies, is accurate and reflects that the water situation in the State of Selangor is critical. So, based on that, I said earlier that, based on the information provided, 833 projects at this time have not been approved for construction because there is not enough water for them to continue construction. At the same time, I am also aware that non-revenue water is at a rate whose figure is likewise 34.6%, which is high.
[Bangun]
Wait, Honourable Member for Gombak. So, based on everything that the Honourable Member for Gombak has mentioned to give the impression of blaming the Federal Government or SYABAS and Puncak Niaga, this is inaccurate, because the actual situation must be taken into account. There are indeed agreements between SYABAS and the Federal Government, as well as with the state government. There are many such agreements. Among them is in terms of tariff increases. The tariff increase should have been implemented in 2009, but the Selangor State Government did not agree, and this is in a court case at the High Court. A review should also have been carried out in 2012, but this has not yet been agreed because of the problems between the state government and SYABAS. So, in this matter, the NRW issue, investment to reduce NRW certainly cannot be implemented. At the same time, SYABAS can only pay 40% or 50% of the water supplied by the other three concessions, including SPLASH, Puncak Niaga and ABASS, because it does not have enough money, because its request, its application for the tariff, has not been approved since 2009. So, this needs to be taken into account, because if we want to blame one party, it is not correct, because in this situation, this is the actual situation: the Selangor state is also equally at fault. That is why I am in this ministry.
[Bangun]
The Prime Minister said, "Max, you see if Selangor got a problem"? I have asked that political matters be set aside, and we need to move away from moderation to resolve this matter. Otherwise, a crisis situation cannot proceed. Feeling that, I have given... A little more, three minutes, and I will give you room. Based on that, our side, Mr Chairman, our side has... and tried to open a new picture to resolve this. I have met all the concessionaires, I have discussed with the Menteri Besar twice to find a solution. Okay, and twice, many more informally.
Okay, may I interject briefly?
Wait, wait. After that, I said the Federal Government, the Cabinet, agreed, okay, we can give it to Selangor if it really wants to take over water, subject to three matters: (i) it must comply with the WASIA Act, which governs water services and management; (ii) willing buyer, willing seller. That means willing buyer, willing seller; we cannot force them. We cannot force them using the Act to cancel their licences, because if we did that, I would have to pick a fight with them, and that would not be correct in terms of industry behaviour; (iii) Langat 2 must operate, because the laying of raw water pipes is already 82% complete overall. Langat 2 should be completed to start treatment next April, but they have become a white elephant. Water is flowing, but Langat 2 has not started operating. Where do you want to send the water? Send the water to the Klang river or where?
Meanwhile, that is the situation. So, with that...
Okey...
Meanwhile, that is the situation. So, with that...
For my part, I ask for an explanation on the issue...
Wait, I will give it to you. After that, the Federal Government made this offer to the state government openly, and we have discussed it. I understand that last week they offered openly to take RM9.6 million for themselves. For the information of the Honourable Member for Gombak, that RM9.6 is not merely equity; RM9.6 includes equity and also includes the value of the infrastructure they own. This is not listed in the agreement, in what is complied with. That value is subject to, including depreciation and so on. So, you have to be accurate in providing information on this matter, because the Federal Government is very sincere in seeking a solution. Even if Selangor were to give a development order to start, but with a margin of less than 1%, even if I accept that percentage, what are you going to do about the 833 projects that have been postponed? It will affect Selangor, the Federal Territories and the whole country. We still have to get mitigation to ensure that, because even if Langat starts, it will take three years before it is completed, and at the same time, this situation is... So, the situation is critical, and if the Selangor state does not wish to cooperate, then the Federal Government has no option but to invoke the powers in that Act to ensure that the national interest and water security in the State of Selangor and the Federal Territory can be guaranteed.
Thank you, Mr Chairman. Since the Honourable Minister gave a lengthy answer, I would also like to be given a little room to seek clarification. The Honourable Minister's answer was more political than providing the actual facts. If we are talking about the development of Langat 2, if we can agree this evening, tomorrow the state government can sign the planning permission to be granted, but the condition is that some core matters that we debate this evening must first be resolved. First, the Honourable Minister stated that the facts I gave were inaccurate, whereas if we refer to the Hansard of my debate this morning, it has not changed. I acknowledge that the capacity for distribution of treated water that can be distributed by the system operated by SYABAS is 4,686 million litres per day. That is the figure the Honourable Minister also used. That is the first point. So, there is no contradiction. I also said in the debate this morning that I acknowledge the margin is still low and needs to be improved. Therefore, we have agreed to propose that treatment plants that have the capacity to use this overload method be allowed to produce treated water, and this has happened at water treatment plants. There are two water treatment plants that have used this overload measure, namely the Sungai Semenyih Water Treatment Plant and the Sungai Langat Treatment Plant, for 10 years. If this is continued, we are confident that the minimum production of treated water will be at least 5,252, which represents 12.7%. Thus, there is no water crisis as raised by the Honourable Minister just now. If we only continue the old method, it is true that the margin is still low. We can use the figure
that we agreed on this morning, which is 3.6%. However, if we continue this overload approach for several plants that have the capacity and ability and whose technical aspects cannot be doubted, then we can increase production to 5,252, representing a 12.7% reserve of treated water supply. That is the first point on which I would like to seek clarification.
Second, once again the figures, Datuk Seri. For the ministry's part, it does not depart from what I stated this morning regarding non-revenue water, or NRW. Datuk Seri stated that only three states recorded NRW rates below 20%, namely Sarawak, Johor and Penang. Remember?... And stated Selangor at 34.6%. The figure I used this morning was 34.4%. Okay, the question I raise is, why has the Federal Government taken no action against SYABAS, which agreed in the concession agreement that by 2012 NRW would be reduced to 19.98%? The ministry must answer. In the concession agreement, SYABAS agreed that by 2012 NRW would be reduced, but it was not reduced, its capacity has exceeded the agreement. However, NRW did not fall; instead it rose to 34.4%. The ministry agreed, the Selangor state also recorded the same figure, but the ministry still kept quiet, still remained an observer, took no action against SYABAS. I want to tell you that if SYABAS had succeeded in reducing NRW to 20% by 2012, there would have been a saving of 663 million litres per day, and with this saving we could meet the demand from the new industries that Datuk Seri mentioned earlier, more than 800 new industries that are waiting for approval from SYABAS to obtain treated water supply. However, SYABAS, with the help and support of the ministry, has prevented these industries from obtaining approval, because this is a political action to punish the Selangor State Government. That is all. If SYABAS were monitored by the ministry under the concession agreement, it must comply and reduce NRW to 19.98%, but this has not happened. Why does the ministry still keep quiet? That is a question that must be answered. So there are two examples I have shown: the facts and figures do not depart from what has been stated by the ministry. That is the second point. Thirdly, Datuk Seri said that because the state government did not allow the tariff increase, this is what happened. However, Datuk Seri and the ministry must remember that one element in the tariff increase is the reduction of NRW. If NRW is not reduced, but instead increased, why should we allow a tariff increase that will burden the people? That too is something Datuk Seri must answer this evening in this august House...
Kedua, sekali lagi angka Datuk Seri, bagi pihak kementerian tidak lari daripada apa yang saya nyatakan pagi tadi tentang kadar air tidak berhasil atau NRW. Datuk Seri menyatakan hanya tiga negeri yang mencatatkan kadar NRW di bawah 20% iaitu Sarawak, Johor, Pulau Pinang. Ingat?... Dan menyatakan Selangor 34.6%. Angka yang saya gunakan pagi tadi 34.4%. Baik, persoalan yang saya bangkitkan, mengapa tidak ada tindakan oleh Kerajaan Pusat terhadap SYABAS yang telah menyatakan persetujuan di dalam perjanjian konsesi iaitu pada tahun 2012, NRW akan diturunkan kepada 19.98%. Kementerian kena jawab. Dalam perjanjian konsesi, SYABAS bersetuju pada tahun 2012 NRW akan diturunkan tetapi bukan tidak diturunkan capaxnya sudah melebihi daripada persetujuan. Akan tetapi NRW tidak turun, malahan meningkat kepada 34.4%. Kementerian setuju, negeri Selangor juga mencatatkan angka yang sama tetapi kementerian masih mendiamkan diri, masih menjadi pemerhati, tidak ada tindakan terhadap SYABAS. Saya hendak beritahu sekiranya SYABAS berjaya menurunkan NRW pada tahun 2012 kepada 20%, berlaku penjimatan sebanyak 663 juta liter sehari, dan dengan penjimatan inilah kita boleh menampung permintaan industri baru yang Datuk Seri sebutkan tadi, lebih 800 industri baru yang sedang menunggu daripada kelulusan daripada SYABAS untuk mendapat bekalan air terawat. Akan tetapi SYABAS dengan mendapat bantuan dan sokongan daripada kementerian telah menghalang industri-industri ini mendapat kelulusan kerana ini adalah tindakan politik bagi menghukum Kerajaan Negeri Selangor. Itu sahaja. Kalau SYABAS dipantau oleh kementerian berdasarkan perjanjian konsesi mesti patuh turunkan NRW kepada 19.98% tetapi tidak berlaku. Mengapa kementerian masih mendiamkan diri? Itu persoalan yang perlu dijawab. Jadi ada dua contoh yang saya menunjukkan, fakta dan angka tidak lari daripada apa yang disebutkan oleh kementerian. Itu yang kedua. Ketiga, Datuk Seri sebut bahawa oleh kerana kerajaan negeri tidak membenarkan kenaikan tarif maka inilah yang berlaku. Akan tetapi Datuk Seri dan kementerian harus ingat, salah satu elemen dalam kenaikan tarif adalah penurunan NRW. Kalau NRW tidak diturunkan, malahan ditingkatkan, mengapa harus kita membenarkan kenaikan tarif yang akan membebankan rakyat? Itu juga Datuk Seri kena jawab pada petang ini di dalam dewan yang mulia ini...
Yes, Honourable Member, this is an interjection. I must ask the Honourable Member to summarise, because we are in an interjection.
So, let me first ask for explanation on those three points. Thank you, Mr Chairman.
If I may, just a little. Just a small point. I feel...
Earlier, the Honourable Member did not speak even though an old friend...
That is correct, but I also want to help the Honourable Minister and help this House. Mr Chairman, I propose that it would be good if, provided I am convinced, I believe in the sincerity of the Honourable Minister when he says he wants to resolve this problem. So what is wrong if the ministry, together with the Menteri Besar and the Selangor State Government, with the Honourable Minister himself leading the ministry's side, and the Menteri Besar of Selangor himself on the Selangor side, invite the Honourable Member for 'Ampang', sorry, the Honourable Member for Gombak, to
join them as well. I believe that if everyone is sincere, this matter can be resolved. Thank you.
Where does the Honourable Member for Gombak want to sit? He wants to wait until he becomes the new Menteri Besar, then it can be resolved [Laughter].
This is the political answer we have heard this evening. I give figures, I give facts, I ask for clarification.
Ya ya.
If I did not give the exact figures, I will give them....
Okey, okey.
However, I gave two examples, and our figures are the same.
Indeed I am giving an explanation, I am giving an explanation.
However, the ministry has failed to explain to the people.
Thank you. Actually we are heading to the Honourable Member from....
The Honourable Member for Indera Mahkota.
...the Honourable Member for Indera Mahkota. That is actually our purpose. On a policy basis and in a transparent manner, we have offered it to the state government. You want to take over water? Yes, subject to this, okay. So, they have accepted it. Thereafter we met, I also met the concessionaires, and indeed the developments have been good on an official basis: the state government has offered the four concessionaires price values that must be complied with. We, the government and the ministry, have also said, "You need to make the offer." This is because the ministry cannot use the Act. It has to be willing buyer, willing seller, but we said we can facilitate, we can talk to them, because if we used anything other than that, it would mean they want me to force them to accept the offer, which is not allowed. We have a golden share. In Sabah only, we do not have a golden share in PUNCAK, we do not have a golden share in ABBAS, no golden share in SPLASH, there...
However, the ministry, the Federal Government, has a golden share in SYABAS.
SYABAS sahaja.
Ya.
In terms of the buyer, but in terms of us, we cannot force the three water treatment companies.
Datuk Seri, the Federal Government has experience with IWK. When IWK was privatised, and then the government took it back, took over and bore the losses, it was able to use golden shares. Why can we not use the same approach in this situation?
In SYABAS we can, but in the three companies that sell water and carry out that treatment, there are none.
Show the sincerity of those golden shares with SYABAS first.
We would have to cancel, or find a reason for a course, find reason for course, that is not allowed. That is why, if you say, on this basis, willing buyer, willing seller, the Federal side, we can facilitate. Okay, I can sit in the discussion, for instance.
Datuk Seri can directly answer the earlier explanation.
After that... Okay.
Apart from WASIA, which can be applied, another thing I mentioned is the decision of the Cabinet. I want to read it here: the Ministry of Energy, Green Technology and Water, through a letter dated 11 February 2008, informed the Selangor State Government that at the Cabinet Meeting on 16 January 2008, it had considered and decided. First, KDEB takes over the operation and maintenance for treatment and supply of water in the State of Selangor, the Federal Territory of Kuala Lumpur and Putrajaya, including the Langat 2 Plant. I am reading the Cabinet decision here...
Ini...
...So that the Selangor State Government cooperates with the ministry and Pengurusan Aset Air Berhad in carrying out the holistic restructuring of water services in the state of Selangor, the Federal Territory of Kuala Lumpur and Putrajaya. KDEB will be the main driver in the new consortium. The Cabinet has already made a decision. Why does the Minister's decision, the Cabinet's decision, not want to be complied with? This was done in January. Why a political decision? This is why the decision was made in January 2008, and in March 2008 UMNO lost. When UMNO lost, the decision of the Cabinet of Ministers was not implemented...
This is because the state government....
Isn't this a political action by the Federal Government against the people of the state of Selangor? Answer that one, Datuk Seri.
The answer is simple. When they want to discuss with the state government...
Sit down, Honourable Member, sit down.
The state government does not want to sit down and discuss, simple. When we raise....
We have already sat down, we have already discussed....
When SYABAS raised the tariff review for 2009, the state government did not...
I have already said, one element for raising the tariff rate must be a reduction in NRW. NRW did not fall, but rose.
Yang Berhormat.
No, no, no...
One at a time, Honourable Member.
If NRW rises, how can we allow a tariff increase?
No, it had already fallen at that time, of course the review did have....
Fallen from what? Give the figures, give the figures...
The Honourable Member for Gombak.
Semakan 28.
Berapa?
It had already reached 28 at that time.
The figure of 28 is still high because...
Yes, that is precisely the review based on...
One at a time, Honourable Member.
This is because in the agreement, I am following the agreement, the concession agreement. Listen first.
But they did not want to discuss...
The Honourable Member cannot debate like this, Honourable Member.
...Until they went to court now.
No, because the concession agreement states it must be reduced to 19.98%.
Yes, it cannot be reduced all at once, the agreement is only one year old.
[Bangun]
What? Stand up, stand up.
Okey I have the floor. Thank you, thank you.
Honourable Minister, what I recall is that when the Selangor State Government won, it promised the people of Selangor that water would be free, because it wanted to give free water. Until now, where is the free water? Now they want to debate, press the Minister. [Interjection] I know, because I have a house in Selangor.
Free water has indeed continued, it has been six years already. What is the problem?
Thank you. Okay, the Honourable Member for Gombak.
Yes, sit down, Honourable Member. The Minister may answer, yes.
Okay, I said earlier that the reduction in water losses is indeed packaged with the tariff. If it does not allow a tariff increase, from where will it generate money to reduce NRW?
Honourable Minister, here there is information...
Honourable Member for Gombak, you cannot do it like this, Honourable Member.
Cukup, cukup.
No, I want to make a clarification...
You cannot do it like this, a clarification must follow the rules, Honourable Member.
I want to ask for permission.
I want to finish, I will give it later. I will give you the opportunity later.
Until the end of 2012...
Honourable Member, sit down, Honourable Member for Gombak.
...High Court at the moment, challenging decision.
Yes, it's all right. I want to give figures, I want to give figures. Until the end of 2012, capex...
Who is this Minister, Honourable Member?
... for NRW has been approved in the amount of RM1.2 billion. It has been given, it was not refused, but our capex was given RM1.2 billion and yet NRW could not be reduced. So how can the ministry defend a company like this?
No. In fact SYABAS has also implemented the NRW project, you see.
Sit down first, Honourable Member.
But the capacity to do that is subject to the tariff review. In 2009 you did not allow it, now in court next week I think the hearing, and then due for another review in 2012, not allowed. So that is why there is none, the Federal has to come and help with this mitigation. So it's not so simple, it's a chicken and the egg. Nobody can be blamed, okay?
Honourable Minister.
Pada saat ini, Selangor if you allowed increase, I believe that they would have implement the NRW towards kadar yang seperti mana dalam perjanjian. That’s why under arbitration di mahkamah. Now anyway, I just finish first. Daripada segi perbincangan seterusnya, kita cukup terbuka. Saya perlu orang bagus juga bah, saya mahu cari penyelesaian. When you talk about RM800 billion project KIV, hotel lima bintang mahu buka tak ada air because there is no margin, how? So I said even if Selangor kasi DO esok, tiga tahun baru siap. Mana mahu cari 1,000 million megawatt per liter?
Mr Chairman, wait.
Just a moment, Honourable Member.
I want to ask for an explanation.
So we have to work together. Pendek kata, kita perlu sit down together because the conclusion from the Government Selangor side is very slow. Saya telah beri maklumat.
Menteri.
First of January, but we have to finish...
Minister, I would like to suggest...
Honourable Minister.
... I cannot invoke the akta.
Minister, I already suggested just now that the Minister and the Menteri Besar and the Honourable Member for Gombak sit down and solve it.
[Dewan riuh]
[Tepuk]
Ya, ya.
Bagilah.
I just complete that one. Actually that is the purpose, after this the offer is closed on the fourth, I am given to understand, and we return. We - I am very open to what has been announced by the Selangor Government.
Honourable Minister.
Dia kata 9.66, okey and then lepas itu dia kata pendapat saya kami katakan Federal will appoint international audit company to do the due diligence, so ada back up dan arbitration
Pohon penjelasan.
...kalau tidak, company tak setuju go arbitration dan Yang Berhormat telah katakan kalau lebih daripada itu bayar, kalau kurang pun bayar is a good offer. Akan tetapi only the volume so all heading di sana, tetapi terlampau lama. For me, no on the Kerajaan Negeri Selangor side tapi on the fourth it would be over there. So mengenai dengan komen tadikan, kasi burst ini loji tak bolehlah Yang Berhormat. I tell you ya, sila duduk dulu Yang Berhormat Gombak.
Sit down a moment, Honourable Member for Gombak.
Over now is Semenyih. Semenyih is overloaded, its capacity in terms of design is 545, today it is 647. It can burst at any time. Langat, 386, it is now at 437. Actually aside from that, Sungai Selangor Phase 1, its design is 950 - 1,013. In terms of this, Selangor Phase 2, 950 million litres a day, 956. In terms of what else? Sungai Batu, 114 million litres, 132 today. In terms of Sungai Labu, Sungai Labu alone and Bukit Nanas have a capacity for bursting.
Minta penjelasan.
No, that's enough. My brother, no, enough. We need to find one million litres per day for the whole supply.
Okay, thank you Honourable Minister. Thank you.
So my advice is that I ask the Selangor State Government to act quickly, I have already given enough facilitation and everything.
Okay. There are two things I want to ask.
Kami mahu duduk tapi come first Januari kalau belum lagi, situasi adalah dalam keadaan krisis then I will have to invoke provision based on National Security section 114.
Don't threaten, please don't threaten.
I know we have to find the solution. Keadaan teruk, keadaan teruk.
Okay, but I want to ask the Honourable Minister. The Honourable Minister said earlier at the start that Selangor, NRW of 34.6%, has been reduced to 28%, it has happened before. I ask the ministry to give when the NRW period fell to 28%, I ask for an explanation. Good, if it is not true, because our records show that there has never been a reduction of Selangor NRW to 28%. If the Honourable Minister fails to give an accurate answer, I propose that the Honourable Minister be referred to the Committee of Privileges. That is the first, wait.
No, no, the exact figure …
Nanti, baru-baru.
Now, the exact figure I don’t have...
Mr Chairman, this is a threat. Not good. Minister, only when the Honourable Member for Gombak becomes Menteri Besar can we negotiate.
[Dewan riuh]
It's not a threat, I am asking. I am asking.
What is this, Honourable Member for Putatan? Why all the noise?
It's not a threat, I am asking, I am asking for an explanation.
[Dewan riuh]
This is a threat, this is a threat. It would be better if the Honourable Member for Gombak waits until he becomes Menteri Besar, then we negotiate later.
I said I am asking for an explanation, I am not asking ...
I said I checked the record, but indeed it was once lower than the present 34.
It was once lower?
Oh yes.
Ha, 33, not 28.
Tak, tak around that lah. I would check the figure, secara bertulis.
Ha, look, it has started. It's already wobbling, it's already wobbling.
Tak, tak. I have to check, saya akan bagi secara bertulis.
There has never been a reduction in NRW. That is why the Minister must answer...
Never from 34? Never.
I ask the Minister to check with the officers behind whether that figure is correct or not, that is the first. Second, the Honourable Minister mentioned this overload that causes danger. Good, the Honourable Minister is also aware that usually when we build water treatment plants, their engineering design allows for over-design to accommodate this overload. That is why in the context of the two treatment plants at Sungai Semenyih and Sungai Langat, although they have not taken overload action for more than 10 years, Alhamdulillah they are safe and we continue monitoring, there is no problem, but I want to tell the Honourable Minister. I propose that if the Honourable Minister disputes the figures I have put forward, I want to propose to the Federal Government whether it agrees or not, that we form an independent consultant to carry out an audit on four matters. First, the capacity of all plants. We have 34 water treatment plants, I tell you the capacity of each plant like this, but the Honourable Minister does not agree. Let us carry out an independent audit. Second, the demand for treated water. SYABAS certainly presents figures that give and favour SYABAS, but let us hold an audit. See how much demand there is from industry and also households in the State of Selangor for treated water. Third, we want to see whether the SYABAS and SPAN projections are correct or not, and fourth, the matter of NRW. Even though the Honourable Minister agrees with my figure that it is around 34%, we want an independent audit that can verify these figures so that we can find a solution. I have already put forward this proposal in the previous session, but there appears to be no sincerity from the ministry in carrying out this effort.
Finally, Honourable Minister, I want to ask for an explanation once again. The Right Honourable Menteri Besar has already made an offer on 21 November, this is the fifth offer. Don't blame the state, we have tried to expedite this process. This time we offer RM9.65 billion and this is not conclusive. If SYABAS does not agree, if the Federal Government, which is the patron of SYABAS, does not agree, we agree to go to International Arbitration, as I have stated just now. So why does the government not try to persuade SYABAS? Use the golden shares.
IWK, the ministry can do that. Why not SYABAS? Why is SYABAS so immune in this context? So I hope the Honourable Minister can give an explanation.
Yes, yes, yes.
Ucapan kedua, ucapan kedua Tuan Pengerusi. Ucapan kedua sudah. Kita ambil perkara yang telah pun disentuh tadi but you knowing overloading is not a good engineering practices. Tapi saya akan, tidak payahlah ada konsultan buat, kita boleh buat estimation. Kalau lah kita boleh burst berapa banyak pun kita burst, how much berapa banyak sebenarnya air tambahan yang kita boleh. Pasti dia hanya boleh kira-kira maybe 30% daripada keperluan sebenarnya. Maybe dia boleh paksa pergi paksa kita punya ke margin 1% atau 2% tapi menjamin untuk 833 projek, tiga tahun akan datang, I don’t know to pray very hard to get the rain to come down. We have to go beyond raking engineering design and satu penyelesaian yang tepat ini, selesai Langat 2 ini, produce the D.O, we can work together then Federal Government maybe we can go and help with other mitigation in the mean time. If you don’t look at other, the pipe, the water 85% saya akan kasi keluar Klang Valley saja, di sungai saja because water is not going anywhere. And talk always ……just because a politic, you know. The Federal Government has been very consistent, we don’t care much about politic, we care more about the people and investment climate in a Klang Valley, Wilayah Persekutuan and the country. High time, which out the side, semua ini. Kita maju ke hadapan.
Datuk Seri, if the ministry can persuade these four concession companies tomorrow, tomorrow they can get the D.O from the Selangor state government. That is our guarantee.
I want to say..
But the ministry must ensure these four concession companies accept the offer made by the state government. If they accept tomorrow morning, by tomorrow evening they get the D.O. That is the guarantee I can give.
Itu, saya boleh beritahu itu Yang Berhormat, you know. Saya katakan it has to be the basic of willing buyer but we can assist. Untuk makluman saya telah jumpa satu persatu mereka. Ada yang dua kali saya jumpa untuk facilitate supaya dengar dua pihak and find solution. Saya mudah- mudahan offer yang telah diberi itu mereka akan pertimbangkan dan pihak kementerian sebagai mewakili kerajaan, will do our best to ensure. Failing that then we have to use the law. Tapi saya inginkanlah ada supaya satu penyelesaian melalui sifat tolak ansur dan moderation. Asingkan perihal politik. Dont’ take - I mean seperti Yang Berhormat Tanjong Karang katakan you know, pakatan no claim. Nah, we are able solved it. It all because of Pakatan. I mean nothing of that should be, we should find the solution yang sebenarnya and tanpa ini then solution can only be political then it will be very sad. So, saya ucapkan terima kasih kepada Tuan Pengerusi. Saya rasa penjelasan yang sejelas-jelasnya. Kerajaan pusat ingin betul mencari penyelesaian mengenai air. We are all sad about situation. Bagi pihak kementerian kami telah teliti ini sebagai crisis situation. We are looking at all kind of options termasuklah D.O keluar esok. What are the options to make sure that there is sufficient untuk tiga tahun akan datang. What did you do then it harder than 33 project dan begitu semua. Jadi jalan yang terbesar, terbaik
is sincere cooperation, and I really thank you because among the Honourable Members from Pakatan, many have clearly been worried about the situation, asked the Federal Government, and we too are worried and we want to find a solution. Thank you to all who took part in the debate on the allocations under Head P.29 and B.29. Anything I did not have time to answer, we can answer later in writing or follow up by SMS with the ministry. That is all, thank you.
Thank you. Honourable Members, the matter is that the sum of RM135,748,000 for Head B.29 under the Ministry of Energy, Green Technology and Water, forming part of the Schedule, is to be agreed. [The question was put and agreed to] [The sum of RM135,748,000 for Head B.29 is ordered to form part of the Schedule]
The matter is that the expenditure of RM1,965,909,400 for Head P.29 mentioned in the Development Estimates for 2014 is to be approved. [The question was put and agreed to. The sum of RM1,965,909,400 for Head P.29 is approved to form part of the Development Estimates 2014]
Bill — Supply Bill 2014 Second Reading and Development Estimates Motion 2014 Committee — Clause B.30 [Schedule] – Clause P.30 [Development Estimates 2014]Bill
Supply Head B.30 and Development Head P.30 under the Ministry of Science, Technology and Innovation are open for debate. The Honourable Member for Hulu Langat.
In the name of Allah, the Most Gracious, the Most Merciful. Thank you, Mr Chairman. I refer to Item 20300 - National Science Centre, whose allocation is valued at RM12.1 million. It has indeed been my interest in creating awareness and increasing the public's interest in science, technology and innovation, but I think it is not enough to rely only on exhibitions, and what other forms are being implemented by the ministry to convey science and technology knowledge. I still propose the use of the electronic fields available now so that it is more effective in disseminating science and technology information, especially on science and society. Based on Item 00604 under Development valued at RM17 million, is there any addition to science centre buildings that will be built, or to upgrade the basic needs within the science centre itself. Item 10200 - Science, Technology and Innovation Policy is valued at RM19.3 million. Does the ministry have a national science and technology policy like the National Automotive Policy or the National Cooperative Policy and others to guide the direction of science and technology, for example in R&D and the commercialisation of their products. What efforts have been implemented to link science and technology activities with benefits to society. In efforts to protect themselves or in terms of their health, in terms of society, community and also the environment. Head 30000, R&D, geoscience technology valued at RM118.9 million. I fully support, and we need to strengthen the development of human capital and intellectual property and be able to generate economic growth. So, the additional R&D allocation of RM5.5 million under 70400 and Item 80300 valued at RM4.5 million listed in the budget, is it also an addition or is there a special focus, a special purpose to further increase R&D. Does the ministry also plan to
to develop new R&D institutions since it was given development allocation under Item 00800 valued at RM220 million.
Also among the major allocations in R&D is the Malaysian Nuclear Agency under Item 030100 totalling almost RM70 million, which aims to generate new products and technology. So I would like to seek a full explanation from the Honourable Minister on the R&D carried out by the Nuclear Agency that can encourage and generate public interest in nuclear technology and its benefits to society. What is the thrust of the R&D to be carried out by the Nuclear Agency, whether according to the Honourable Minister's field ND3 or other fields. So I ask for an explanation. Is there likewise in P.30, under Item 00900, RM20.9 million for development? [Mr Speaker takes the Chair of the Committee] I ask for an explanation, are there any more labs or buildings that will be built under this Nuclear Agency? Under Item 040100 - Atomic Energy Licensing Board (LPTA) valued at RM13.7 million, which I am indeed given to understand is a body to control activities in nuclear technology to harmonise the life of society. So I would like to get an explanation for the knowledge of the House and also the society or the public, what are the activities of LTPA arranged to safeguard the safety of the people. Lastly, the Academy of Sciences Malaysia (ASM), Item 050100 valued at RM8.8 million. Is the Academy of Sciences Malaysia (ASM) a government agency or an NGO, and what is the main role played by ASM or this Academy of Sciences Malaysia in promoting science, technology and innovation activities. That is all, thank you Mr Chairman.
Please, the Honourable Member for Sekijang.
Thank you, Mr Chairman. I want to touch on matters relating to the ministry for Head 010000 - Management, for sub-head 010200 - STI Policy. MOSTI carries out work relating to R&D and among the Science, Technology and Innovation Policy, namely for the first programme relating to management of the ministry and the second activity for the Science, Technology and Innovation Policy, namely STI. Among its objectives is to renew policies and innovation programmes to the national level by ensuring R&D products are commercialised based on community development programmes that are creative and characterised by entrepreneurship. There are various activities involving R&D in MOSTI including in the third activity, namely science services under programme one relating to management. The ministry has made: (i) funding for R&D projects; (ii) provided e-Content funds or the Demonstrator Application Grant Scheme (DAGS); (iii) approved projects under the Science Fund or Techno Fund and also Inno Fund. To manage these services, the ministry estimates that in the management of services of this size in 2013, the amount is RM116 million and is expected to increase by RM243 million in 2014.
My question is how successful the programmes that received this funding have been, and which products have been commercialised by MOSTI as outlined in the objectives of science, technology and innovation policy management. Can the ministry also submit a list of the research currently being carried out jointly, with its funding value and research duration? A list of findings for R&D for 2011 and 2012, a list of R&D programmes that will be completed in 2013 and also 2014, and a list of R&D programmes the ministry hopes to undertake that have not yet been carried out and that can bring benefits especially to the people. For Head 030000 – Science and Technology Research and Development, under Item 030100 – Malaysian Nuclear Agency. In R&D related to science and technology, how has the Malaysian Nuclear Agency performed, particularly in achieving the objective of generating new products and technologies? The Malaysian Nuclear Agency is an agency under MOSTI that carries out science and technology R&D and receives the highest funding, an estimated RM69 million in 2013, compared with Remote Sensing Malaysia's RM31 million, while Angkasa Negara received RM24 million. My question is, what are the outputs or income from the R&D of these agencies for 2011 and 2012, and what constraints did the Malaysian Nuclear Agency face that prevented it from achieving the minimum income ratio of 30% of the annual operating budget through the transfer and commercialisation of this technology? In 2012, the Malaysian Nuclear Agency achieved a ratio of only 20.8%. What will the Malaysian Nuclear Agency do to achieve this 30% objective as planned for 2013 and 2014? For the last one, Mr Chairman, for Head 01100 – MIMOS Berhad. This one is not too technical; it only concerns MIMOS's step in introducing the Kampung WiFi technology. Although this is in fact under the Ministry of Information and Multimedia, I want to touch on it because the Kampung WiFi technology was developed by MIMOS. However, what is happening today is that this technology is seen as not yet reaching the required standard, because we know that several village areas, especially those using this technology, have responded saying there are problems, particularly relating to access speed and also range, which are quite low. So I ask that the ministry monitor whether this MIMOS technology is truly effective and can really help the Kampung WiFi project as intended by the government. Thank you, Mr Chairman.
The Honourable Member for Gopeng.
Thank you, Mr Chairman.
After the Honourable Member for Gopeng, the Honourable Member for Putatan is ready. Please proceed.
For start, I would like to take part in the debate at the Committee stage on the MOSTI Ministry. Indeed, among MOSTI's main objectives is to generate knowledge to lead the new economy through the development of human capital and intellectual property, and the development of science, technology and innovation is critical. It is among the main factors in ensuring sustained economic growth and avoiding the middle income trap. Therefore, the MOSTI ministry plays an important role in adding value to all economic sectors. Unfortunately, when we examine MOSTI's functions, we find that, firstly in terms of allocation, it receives only RM1.35 billion. This is merely 0.5% of the total 2014 budget, which is RM264 billion. If we compare it with the Ministry of Defence, for example, although we are not involved in any war with neighbouring countries, the allocation
for the Ministry of Defence is RM16.1 billion. This means that MOSTI, although it is a fairly important aspect, receives only 8% of the allocation compared with the Ministry of Defence. So, I would like to refer specifically to Head 00800 – Research and Development Programme (R&D). For 2014, an allocation of RM220 million has been provided, and if we look at a report by RD Booz & Company, annual R&D expenditure 2013, which studied the allocation for R&D by international companies, I will only cite one company, which I am sure everyone knows, namely Samsung Electronics.
The R&D expenditure allocation for Samsung alone in one year amounts to USD10.4 billion. This means that the allocation we provide in the MOSTI ministry, which totals RM220 million, compared with the allocation by one company alone, namely Samsung, is 150 times the allocation we provide. If we compare it with the entire MOSTI ministry's allocation, Samsung alone has an R&D allocation that is 25 times greater. This shows that the allocation and emphasis on R&D in Malaysia is quite lacking from the government public sector side. If we look at the private sector side, it is even more lacking. So, we may need to study other approaches if we want to encourage R&D activities, especially at the private sector level. For example, if we look at the United States, average R&D expenditure is about 3.5% of a company's revenue. So, if we want to require companies listed on the Kuala Lumpur Stock Exchange, for example, to have allocations for human resources and CSR, for instance, can we consider stipulating that every company listed on Bursa Saham Kuala Lumpur must allocate part of its revenue to R&D? This is merely a suggestion which I hope can be considered. The problem is not only a lack of funds, but when we look at the agencies under MOSTI, there is indeed an overlapping role, particularly with agencies under other ministries. I will give examples. Under MOSTI there is the Malaysian Innovation Foundation, the National Innovation Centre and so on, and under MOSTI there are funds such as ScienceFund, TechnoFund, InnoFund, there is the Biotech Commercialisation Fund, and there is the Technology Acquisition Fund. But we see that under the Multimedia Development Corporation, there is the Innovation, Research and Development Fund, and there is the MSC Malaysian Status Funding. Under the Ministry of Finance, the Honourable Prime Minister has just announced MaGIC, which is the creative global Malaysia. There is Malaysian Venture Capital Management Bhd under the Ministry of Finance, and there is also Cradle Fund Sendirian Berhad, also under the Ministry of Finance. Under MITI, there is the Service Sector Fund, there is the Automation and Modernisation Fund, and there are Market Development Grants. This means that we see the funds scattered between MITI, the Ministry of Finance and MOSTI, even though their functions are somewhat overlapping. I hope that perhaps the ministry, especially when the so-called objective based budgeting is expanded to all ministries, this matter will be looked into so that these overlaps must be harmonised and such situations do not occur. I am sure that any entrepreneur who wants to invest or apply for these funds would have to conduct a study and an in-depth research so that they know which fund to go to and which agency they need to approach. So, under Item 02100 – Commercialization of R&D Fund (CRDF). This CRDF is a fund to commercialise technology originating from local technology, and the allocation for this project is RM180 million, and for 2014 it is RM23.6 million. Listen, RM180 million for the entire project, but I want to raise once again a scandal involving RM280 million, which I raised at the Policy stage and to this day there has been no answer. The scandal I refer to concerns InventQjaya. Coincidentally, this problem was raised by the Honourable Member for Rembau, who is now
a Minister, in 2009. I have conducted a check and I am sure that to this day there has been no answer. I would like to repeat once again that InventQjaya is a joint venture company between the Government of Malaysia and a scientist from the United States. The scientist is named Dr. Sadeg Mustafa Faris. He was invited to Malaysia by former Prime Minister Tun Dr. Mahathir Mohamad. The purpose was that the company was established to research, develop and commercialise technology-based patents in Malaysia. Indeed, he was supposed to be a scientist, an expert. So, an allocation of RM437 million was approved, of which RM228 million was disbursed in 2002. Indeed, that money was channelled to the InventQjaya company. That money then disappeared. That is why I say this Dr. Sadeg Mustafa Faris is not an expert scientist but an expert in money laundering. Perhaps he is an expert in black holes. Once the money went in, it went into that black hole and was completely lost. Thereafter, InventQjaya closed down and Dr. Sadeg Mustafa Faris was charged in court under the Anti-Money Laundering Act. There was indeed a court decision to sell any existing assets of InventQjaya to pay off the debt, but to this day, not a single sen has been recovered. This is because if we look at the Federal Government Financial Statement 2012, the debt that should be claimed under InventQjaya amounts to RM280 million. To this day, not a single sen has been received. So I request this time, I hope to get a thorough answer on this issue. Under Item 010300 – Science Services. We know biotech is an important field for us to continue advancing the economy. However, a specific problem I want to raise is because I have encountered problems with students and biotechnology graduates. While they were studying at university, there was indeed some exposure to the biotech field. However, after graduating, when they want to gain experience in the field, we see that in the private sector it is rare and difficult to obtain employment. So, if they want to gain experience in biotechnology to develop experience and so on, they depend on government agencies, but unfortunately, government agencies under BIOTEK, for example, also cannot provide full training for these students. So I hope the ministry can look into this matter. Under Head 020200 – Meteorology. I want to raise this specifically because we know weather forecasts are important. Ideally, if we have accurate weather forecasts, we can know when it will rain, how many inches and so on.
So, unfortunately, if we look at what happened, there was the tragedy where the dam had to be opened at Lembah Bertam in Cameron Highlands. Indeed, we see there was a failure perhaps in implementation or in terms of the weather forecast. If the party making the weather forecast could provide an accurate forecast perhaps a week before, they could give an early warning to the party managing the dam so that they could release water much earlier than what was scheduled. So I request an answer from the ministry regarding this issue. What is the role of the party making these weather forecasts in issues such as the dam at Lembah Bertam in Cameron Highlands? So these are several issues I have raised, and I request attention. Thank you.
The Honourable Member for Putatan.
Thank you, Mr Chairman. Although there are clearly many items here, I will only touch on one item which I think is quite important, namely under Development Purpose 30, Supply 61300 – Technology Park Malaysia, where I see an allocation of only RM2.7 million. What I mean, Mr Chairman, is that there is Technology Park Sabah and Sarawak under the MITI items when I debated. But I did not receive an answer from MITI because this falls under the jurisdiction of MOSTI.
What I said in that debate is whether the management of Technology Park Malaysia will be the same as the management of Technology Park Sabah and Sarawak. We have already thanked the Honourable Prime Minister for providing allocation to set up a Technology Park in Sabah. It may be located in Tambunan or Keningau, not yet certain. However, the allocation is already available. What I am saying here is, particularly for Sabah, because there is a wealth of treasures, among the richest, based on natural resources that may be located at the foothills of Mount Trusmadi and also the Crocker Range, where there are parks with virgin forest status, and we see the need to find ways to make discoveries about our wealth from original resources, namely in the form of food, for example grains or fruits, as well as leaves from our native trees in Sabah and Sarawak. Secondly, perhaps in the form of herbs, drugs, pharmaceuticals and much more, as mentioned in the recent statement by a university professor from USM, where we strengthen technologies not only in the fields of study and education, but also in agriculture. When we look at this Technology Park, we may obtain cooperation from foreign R&D companies, such as from Britain, namely 'Scope International' from the United Kingdom, 'Havest Group Noveyet Zink Fisco', Lotus Engeenering, 'Stamepeutic' Reseach India and many more, and those originating from our own country such as 'Patimas, Axiatic Centre for Genome'. What is wrong with inviting players from China, from Japan, from Taiwan as well? Recently, we visited Tenom together with the Member of Parliament for Tenom, bringing a representative of Taiwan to Tenom to see cocoa cultivation in Tenom. We invited him to have cooperation between these two countries to advance agriculture, for example, if China or Taiwan could enlarge apples, bigger than those produced in Europe, America or Australia, why not enlarge our cocoa fruit so that the cocoa beans can be multiplied to become one fruit, one kilo per cocoa bean. This is a step that is considered to increase cocoa production in our country if that can be done. Moreover, during that visit we also looked at Research & Development in fields related to our biodiversity, especially in biotech. If this existed, as stated in the item for Purpose 02100, namely the Commercialisation of R&D Fund or CRDF, which has been allocated only RM26.6 million, we see this as an opportunity for us to create an effort to enhance our scientists and experts from universities to conduct studies so as to increase the number of people qualifying for PhDs, namely in publication, released last October week. This is a statement by Professor Datuk Dr. Omar Osman of Universiti Sains Malaysia, where Malaysia is expected to increase the number of PhD graduates to 500 every year. I know the Honourable Minister is also a professor. So I am sure the Honourable Minister is aware of the objective or direction we have to increase the number of those who make a discovery that we can commercialise. One question I shared with the Honourable Member for Gopeng earlier, regarding this CRDF, Commercialisation of R&D Fund, is that we do not see our giant companies helping or providing funds or contributions to the ministries to set up funds for R&D in this country. So I want to see that this is too dependent on allocations provided by the Ministry of Finance, and I also ask for an explanation from the ministry as to whether there is a very convincing working paper, with the ministry's permission, that truly needs to be transparent towards increasing R&D in this country?
We want to know what kinds of high-quality discoveries the ministry has made or produced through the agencies under this ministry. And we want to produce, not only in human capital and human capital development, but also products of a quality that can penetrate the global market. I ask the ministry: if we have products that have penetrated the market with high-quality results, have those patents been obtained? Lastly, Mr Chairman, the matter of, although it is not in this Item, namely the Malaysia Innovation Foundation or YIM, in which we have involved our youth women, and I also see YIM's efforts at school level, where to my knowledge 100 schools have been identified to find or give results to innovations in each school. What I see is only the written results, but we do not see the quality of these results produced at school level. We also want to know, the Innovation Clubs at school level, how the ministry, does the ministry provide the appropriate allocation to schools for the clubs in each school that have been identified by the ministry? So I see here that there is no Item allocated at all, and I ask for an explanation from the ministry on how the ministry helps these school-level clubs to create awareness, awareness programmes, for our young people, especially school students and also youth women through youth associations, so that they increase or become involved in the field of innovation in our country. Lastly, this is not the last, I forgot earlier. Item for purpose 01600 – Cyber Security Malaysia. This is a field that I was not aware is also under the ministry, and I understand that this is MyCert statistics that provide, to provide emergency response to computer security related to emergency as well as assistant to handling incident such as computer abuses, hacking, attempt and others information security breaches seperti espionage, with permission. So I ask for an explanation from the ministry: does the ministry, the answer or reaction of the ministry, to the matter that is being much publicised by the opposition that espionage is also carried out through ICT and electronic devices? Is the ministry aware, or is this also within the ministry's jurisdiction, to see where our weaknesses and strengths are in the field of Cyber Security? So that is all, Mr Chairman. I thank the Honourable Deputy Minister for listening, she is a Professor, and also thank Mr Chairman for patiently listening to a speech that is not so great. Thank you, I beg to support.
The Honourable Member for Batu.
Thank you, Mr Chairman. I want to continue from the Honourable Member for Putatan on Item 01600 – Cyber Security Malaysia. I welcome the Honourable Member for Putatan, who also shows concern for the sovereignty of the nation. In this debate I urge the Ministry of Science, Technology and Innovation (MOSTI) to give an audit of what has been done by Cyber Security to ensure our national sovereignty is well protected, and that there is no intrusion by major powers, whether the United States, Australia or Singapore, using the existing facilities to spy on the nation's leaders or any other espionage activities. We hope for an explanation from the ministry, a report from Cyber Security, on what steps have been taken to protect our country? Second, under the heading 00800 – Research and Development (R&D) Programme. Earlier we discussed ScienceFund and InnoFund. Firstly,
I would like to get a list from 2011 to 2012, as far as I know in 2013 applications were still being received. Which groups and who have received support from this ScienceFund? And what is their effectiveness in translating this fund to increase productivity? As mentioned earlier by the Honourable Member for Gopeng, our average investment in R&D is only 0.6 of GDP. We want to see, what are we investing in R&D? Not only is it low, but we also want to see, whether what we invest in this can be translated to increase our GDP growth? I am not yet sure, MOSTI should carry out a proper audit so that we can see that not only are we increasing the financial fund for these research projects, but that it really contributes to an increase in the nation's GDP. On the InnoFund issue too, we find that InnoFund gives RM500,000 to companies, and RM50,000 to individuals. For such a small amount of money, I do not see how it will help an innovation that will have a big impact. That is why I hope MOSTI can give an explanation of how the funds that have been distributed through InnoFund, what has happened, and which companies or individuals have received them and how this fund has helped them? We need a more accurate report so that we can improve and strengthen this fund. We have seen that there is a shortage of funds given to R&D, but I think it is not only the amount that is important, but the effectiveness with which these funds are brought to benefit is equally important. Then, under the issue of 040000 – Licensing and Control. I want to raise an issue that has been much debated, namely the Lynas issue. On 2 July this year, Lynas submitted a plan for its permanent disposal facility to MOSTI to obtain approval. I want to know, what is the status of this application? Whether it has been approved or not, and until today the residents of Kuantan or the residents around Gebeng still do not know exactly where the disposal facility is located.
Is this a secret, or has it not yet received a decision from MOSTI? Finally, on the same issue, Lynas. The Honourable Minister once stated that the Lynas plant is safe like a soy sauce factory. According to the Vice President and also the Managing Director of Lynas Malaysia Sdn. Bhd., namely Datuk Mashal Ahmad, the radioactive reading levels of Lynas will always be displayed and are now at a safe level. It is said to be displayed in the plant and also online. I want to know, where can we monitor these radioactive readings online? Are these readings only said to be displayed in the plant, or were promised by Datuk Mashal Ahmad, the Managing Director of Lynas, to say these readings are transparent and the public can know? I want confirmation. Can this data be accessed by the public? With that, I want to end, and thank you.
Please, the one at the back there. The Honourable Member for Bakri.
Terima kasih.
No need to praise me any more, Honourable Member [Laughter]
Yes, I will just continue.
Yes, go on [Laughter]
I want to give an opportunity to our- I am speaking. I refer to Item B.29, Items 070300 and 080300 – Science and Technology Research and Development. Here I want to ask for an explanation. Up to now, how many scientists are there in this country, considering by field of expertise, the number of local scientists from other countries as well as the total number of foreign scientists
by country. What is the ministry's latest target regarding the number of scientists? Up to now, has it achieved the target? If not, why? Does the government provide incentives or facilities to local and foreign scientists as a way of encouraging them to continue exploring the fields of science and technology in this country? Thank you.
Thank you. Please, the Honourable Member for Rasah.
Thank you, Mr Chairman. Mr Chairman, I actually only want to refer to one matter, under Item 030300 – National Space Agency (ANGKASA) and also Item 01200 – National Space Agency (ANGKASA). Mr Chairman, as we are aware, in the expenditure that was tabled last month, we can see that the sugar subsidy has been abolished. Various steps by the government to increase income, especially implementing the UFD taxation system to increase government revenue and also to ease the burden of the government. However, here I only want to refer to one matter where the National Space Agency has been allocated RM100 million. I want to get an explanation from the ministry. Does this allocation also include the Second National Angkasawan Programme? This is because previously I asked a question about the latest developments and also the estimated expenditure that the government will spend on the Second National Angkasawan Programme, but at that time, I did not get an answer from the ministry about how much the cost would actually be spent. At that time, I still remember that the Honourable Deputy Minister gave an explanation. Many experiments have been carried out at the space station, but I only want to get an explanation from the ministry. In fact, earlier we also know that many countries have sent their astronauts into outer space and many studies or many experiments have been done by them. I want to get an explanation from the ministry. Are the experiments we conduct in outer space duplicating, or are they the same as experiments previously conducted by foreign countries? Thirdly, I asked that question in the media controlled by Barisan Nasional, Utusan and also RTM, which have said that I belittled the National Angkasawan Programme. I want to emphasise here that as a people's representative or as an ordinary citizen, we have the right to know about a big project carried out by the government. This is because I see here that if RM100 million is spent on the National Angkasawan Programme, if we divide it among poor families, say each family could get RM3,600 a year, more than 30,000 poor families could receive assistance if we allocate RM100 million. Likewise, if we give BR1M of RM650 a year as a one-off, more than 180,000 individuals could receive BR1M assistance. Here, because ordinary people will think that, say we only send one astronaut into outer space, what is the benefit or what is the actual benefit that is gained by all Malaysians.
Asking to interject. Thank you, Honourable Member for Rasah. Do you agree? What is your view on the experiments we carry out? Can we outsource them to other countries so that we do not need to send them, we enjoy it ourselves to save on experiment costs? Thank you.
Yes, include the speech or question of the Honourable Member for Stampin into my speech. So I ask the ministry to give an explanation because many are wondering whether the experiments we carry out are duplicating, or whether the experiments we carry out in
outer space are a new experiment and truly capable of bringing benefits to our country. Lastly, yesterday we heard debates from both sides about roads in our country. Indeed they are not very durable. I also want to request the ministry, if there are sufficient allocations, to send a team or several teams of scientists to study how we can build roads that are more durable at a lower cost. I think that is more important and also brings more benefit to our country...
Mohon penjelasan.
Ya, sila.
Thank you, Honourable Member for Rasah, and thank you, Mr Chairman. Regarding roads and the technology of building roads. I want to ask the Honourable Member for Rasah and ask for his view on a highway that has just been completed in Kuala Lumpur, namely the Duta-Ulu Klang Expressway (DUKE). A road which, by my measure, 60% of it is elevated. Elevated and about 4% on land, but this elevated part, which should have been built with simple technology because of concrete and so on, can certainly be levelled, unlike what the Honourable Member for Parit Sulong raised the other day regarding roads built on peat land that can become wavy.
However, a highway built with concrete, I think DUKE is one of the worst built highways. I invite Mr Chairman to try DUKE and experience for yourself a very bumpy road. It is built on elevated concrete. That means there is no question of sinking or subsidence, but that is what happens. So how is such an expensive highway, which is indeed important, built with very, very low technology that can be dangerous? I ask what the view of the Honourable Member for Rasah is. Thank you, Mr Chairman.
Thank you, Honourable Member. I think for many of our projects, if a stadium can collapse, anything can happen. So MOSTI indeed plays a very important role to ensure that whether roads, buildings or everything in our country are in good and controlled condition. Lastly, I only want to emphasise once again that I am not opposing the National Angkasawan Programme, but I only hope that the government or the ministry..
Honourable Member for Rasah, may I?
Ya.
Thank you, Honourable Member for Rasah. Regarding this angkasawan programme, I do agree with the Honourable Member for Rasah. We in Malaysia do not have a base. We do not have rockets. We do not have all the equipment that is available. Our technical capacity is not there. So if we want to send an astronaut into space, I think it is not at this time. The money that has been collected should be better used for other matters, not for experiments. The experiments we carry out have been carried out by other countries. There is no need for us to repeat them. Those experiments are not so important. I think it wastes time and wastes the people's money. What is important is to use that money for other matters and not for the astronaut. Unless you have all the equipment. You have rockets. You have all the technical capacity to send. Okay, I have no problem, but no, none of us have it, we only want to hitch a ride. Hitch. That is the problem.
Lastly, I would like to hope that the ministry..
Honourable Member for Rasah, may I interject briefly? Thank you, Honourable Member for Rasah, Mr Chairman. In my view the Honourable Member for Rasah should be proud of the national astronaut because he is a local son from Rasah. Is the Honourable Member for Rasah angry because he did not vote for the Honourable Member for Rasah during the election, or I do not know where he voted. But on research, Mr Chairman, in fact if we look at research by earlier scientists like Einstein, he did not do one study and it was immediately used at that time. So these are the things that will be used in the future. That is the purpose of research. It is named research and development. Thank you.
Thank you, Honourable Member for Kuala Kangsar, but I want to emphasise that I never said it was not so proud. Lastly, I only hope that the ministry, if possible, please explain in detail, because after our astronaut returned from outer space, I think many programmes have been attended, many talks or lectures have been organised, but at present I think our students in primary and secondary schools, and also at university level, rarely see reading materials or research results that we obtain from outer space. Thank you.
Thank you. The Honourable Minister is ready to reply after the Honourable Member for Stampin. Please, the Honourable Member for Stampin.
Thank you, Mr Chairman. Thank you, Honourable Member.
After the Honourable Member for Sungai Petani. Please.
Thank you. Item 030000, Item 030200, namely Remote Sensing Malaysia, and Item 030300 – ANGKASA. I agree with the Honourable Sekijang that the question is: what has RSM's performance been since receiving the allocation given in 2013? I also have still not received an answer from the ministry to the question I raised. What was requested is a detailed answer and the ministry's action, and not a ministry answer that seems intended to avoid the case involving ARSM, with permission, Malaysian Remote Sensing Agency (ARSM) with PNAS, the company Pan Northern Air Services Sdn. Bhd. The answer I received from the ministry is shorter than the question I put forward. So this is not detailed. In March 2009, PNAS sued the Director-General of ARSM and two others to claim arrears and compensation totalling RM112 million, on the ground that they breached the contract for the MACRES Airborne Remote Sensing programme. Besides the head of ARSM, the plaintiff also named MOSTI as the second defendant and the Government of Malaysia as the third defendant. Clearly, we cannot let the case simply end there. My question has still not been answered. Why could such a case happen? Is it because of the incompetent ARSM officers involved, especially the Director of ARSM? What action has the government taken? Who is responsible? That is the second question. Why were so many contracts awarded to a company owned by only two people? I am puzzled as to what the background and competence of that company are. Was the tender open? Were there no other companies? The total value of the projects was about RM143 million over ten years. Third question, RM88 million in compensation. I understand it was only settled at the Arbitration Court, with permission, or Mahkamah Timbang Cara, Yang
Berhormat. So what did we get after paying the RM88 million compensation, Honourable Member? It was simply settled. Pocket ATM million. Easy. Fourth question, given that RSM is also involved in the Malaysian Satellite Programme, which must be taken seriously, especially because it involves so much allocation, and the government must ensure competent officers, especially those at management level. As with the launch of RazakSAT 1 satellite in 2009, which failed when it was put into orbit, involving a total allocation of RM142 million, and RazakSAT 2 will involve an allocation of RM271.9 million. Even within two years, that allocation was raised from RM200 million by RM71 million. This does not include the whole satellite programme we have, including TiungSAT-1 and TiungSAT-2, CHIPSat, InnoSAT, as well as long-term operating costs and technology transfer costs. If all of these are not monitored, they have the potential to lead to waste of hundreds of millions because of incompetent management. My hope, Honourable Member, is to see our satellite programme succeed without any unnecessary waste. Just imagine why the government wastes millions of ringgit to tackle the brain drain problem when the main issue is the ministry itself? Why are lucrative projects always given to agencies whose management is not competent? What is the rate of success, with permission. Is our current culture one where waste and misappropriation constantly occur in the name of science and technology, in the name of defence, in the name of technology transfer, as in the case the Honourable Gopeng mentioned just now. Innoque happened. So Mr Chairman, just imagine, for example, with this RM88 million, how many internationally standard research projects we could bring if it were given to universities and companies of calibre? Yet I receive many complaints from researchers, scientists and professors that many of their internationally standard research projects do not get sufficient allocation. Even that is not much. How many Masters students, with permission, or PhD students could we offer scholarships to with this RM88 million? About 880 students. That is why I have stated that it is strange that the government talks about brain drain and spends so much money to solve brain drain issues, when, with permission, a culture of corruption, cronyism and rent-seeking activities is causing our brightest minds to leave Malaysia because they are fed up.
These intelligent people are not ignorant. That is why, for them, it is better to go to countries where their abilities can be valued. Mr Chairman, with permission, we don't have the environment and the ecosystem that appeal to this type of people, with permission. That is the main reason, in my view, that our universities' standing has dropped and they do not even reach the top 100 universities in the world, with permission. Thank you.
The Honourable Sungai Petani. After that, the Minister will wind up.
Thank you, Mr Chairman. I want to touch on just three matters. First, regarding Item 020300 – National Science Centre. I want to know who our customers are, and I know that many school students are also our customers who visit the Science Centre. I want to know the figure for last year, 2013, and whether this figure has increased compared with the previous year? Second, in addition to these students coming, does MOSTI also go down to see how our schools are, especially the students taking science in schools? The condition of their labs, although this falls under the Ministry of Education's purview, does MOSTI realise that the condition of our labs is getting worse by the day? There are labs with only half the capacity that they should have
that they should have. So how do we develop a Science Centre when, after they become motivated and return to school, the equipment is not sufficient? So there seems to be no synchronisation there. So my question is how many visitors do we have? Second, does MOSTI have any programme to visit schools to see the condition of our science facilities there? Second, I also join my fellow Members of Parliament in speaking about Item 030300, namely the National Space Agency, and at the same time Item 012200, namely the National Space Agency. The issue here, and I want to know, is that when we send our astronauts into space, I want to know how much was spent from the people's money, the national money, and how much we received in sponsorships? We were informed that there are also parties who provided sponsorship for our astronauts to launch. We want to know what the actual expenditure using national funds was and what results we obtained after our astronauts returned. Have these results been detailed and communicated to the public? Then we want to know what's next, because the expenditure to be given after this is RM100 million. So it is a big sum. We are proud of the Malaysian son who may go again, but we want to know what this RM100 million is for, because it is a large sum. The Honourable Kuala Krai, please.
The Honourable Sungai Petani, just briefly. I was interested in what the Honourable Sungai Petani mentioned regarding the results of several studies, Mr Chairman, carried out while our astronauts were in outer space, among them the ability of a spinning top, if I am not mistaken, in the space region, and others. This has been going on for a long time. I think it has been several years. So we were informed earlier that within six months, the results of the research carried out by our astronauts would be communicated. So, is the Honourable Sungai Petani not interested in finding out and demanding that it be disclosed? Thank you.
Mr Chairman, of course the people have been waiting very patiently, in fact for a long time, since we welcomed our astronaut home as a hero. I am certainly, as a Malaysian son, happy to see a Malaysian son pass a very great test. In the end he was also able to join other astronauts going into orbit, but the question now is that of course we are using the people's money. When we use the people's money, of course we want to know what the results are, and what the final outcome is, that can help the people improve their lives? Of course we do it not because we want to have fun, nor because we want fame, nor because others can do it, we do it. Surely we have objectives. It is impossible that the government, especially government officers, would advise the government to do something without clear objectives. I think our government officers are among the best in the world. So surely they will also advise the government to do something beneficial and not merely to gain fame. So a large sum, RM100 million, we want to know in detail what benefits the people will specifically get? Will bringing this programme into outer space again give us a project that can provide a more luxurious and more perfect life for the people? That is what we want to know. Next, Mr Chairman, I return to the Academy of Sciences Malaysia, Item 050000. I want to ask MOSTI for an explanation: how do we make use of the research that this academy has already completed? Is it displayed, or can individuals or companies use these findings or research results to improve conditions? Perhaps with these findings we can also help, for example, implement better roads, or zoom in on local authorities (PBT). Through the existing research, will MOSTI advise PBTs on how to reduce electricity bill
consumption, how better street lighting can be introduced, or how water losses can actually be reduced? Now imagine, let's discuss pipes: how do millions of gallons of treated water simply get lost? Doesn't MOSTI think there should be a group of people thinking about how to detect when water is lost, where the source of the loss is, and how it gets lost? With this research, I think it is very important for the people that we do research which in the end becomes merely academic material but does not give immediate returns to the people. So I want to know whether these research findings are displayed or publicised, or where they can be commercialised if they provide benefits, business in this trace. So that is all, Mr Chairman, thank you, and I thank MOSTI.
The Honourable Minister, please.
Bismillahi Rahmani Rahim, Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you to the nine Honourable Members who have joined this debate, and through three interjections I will answer one by one. Most of them were encouraging suggestions, but there were also some that showed the Honourable Members' misunderstanding of research and development. Let me explain clearly. Research, if we want to understand it, means we do something to improve life, to improve ways of living, but at the very end, the research may or may not succeed, because if our research succeeds, that is no longer called research. That is called production, manufacturing. We spend money on research to do something we do not know, which we anticipate, and sometimes it happens and sometimes it does not. That is what research means.
If we do something and it goes straight to success, that is simply called a factory. That is not under MOSTI. This must be clear. [Applause]. Yes, I will ask one by one. The second one, about the Astronaut Programme, I have already answered. However, the RM100 million, please look again, is under the Astronaut Programme or the RazakSAT-2 Programme. I do not recall saying that day, when answering the question, that the programme had just been brought up, that we are conducting a study, collecting a lot of information, and only then are we thinking about how, whether we want to send a second Astronaut Programme. The RM100 million is for the RazakSAT-2 Programme, for which we have already received an allocation of RM271.1 million, of which RM100 million will be spent next year. This is clear.
[Bangun]
Wait, let me answer further. I have not answered yet, and the Honourable Member has already stood up. I want to take them one by one. Don't worry.
Pasal penyelidikan.
Yes, I can answer.
This is about MOSTI's functions.
Yes, I will answer.
I think this is the core issue.
Yes, I will answer... [House noisy]
Soal penyelidikan.
I said I will answer. I am well versed in this field, don't worry. Earlier, there were Members of Parliament, there was an Honourable Member over there
over there saying the money is not enough, some Honourable Members said the money is sufficient, some said we are short, some said we have too much. In fact, MOSTI's role is for research and development and for commercialising innovative products. This is our work. But we must look at the fact that, for an advanced country, the allocation for research is 2% of GDP. This is what most advanced countries do. Only under MOSTI is it said to be 0.5% of the allocation. However, in fact, much of the allocation is also channelled through other ministries through their own fields. Under the Ministry of Finance there is Cradle, there is DSKM, there is MDeC. Under the Ministry of Agriculture there are some, under the Ministry of Defence there are some. All ministries have specialised in research in their own fields. The Barisan Nasional Government is excellent at division of labour. It understands what is being done, and in the end, our allocation is 1.72 of GDP. We target that by 2020 we will achieve 2% of GDP, equal to the rate spent by an advanced country. This is what we have done. That is money from MOSTI alone, from my ministry. But there are many more ministries to which we channel funds, because these are research fields under their purview. It is not that MOSTI wants to do all these things, because for road building, as mentioned earlier, there is research under other ministries. However, if they ask us for money, there is no problem, we also give. This is because the private sector was mentioned earlier. The private sector actually contributes much research to the country, but it does not go through MOSTI. It goes directly to research institutes. How can we track it? They give it to research institutes, do they not give it to us? We are not an agency to control "how much do you want to give? You want to give?" This is not MOSTI's job. MOSTI's job is to channel government money to research institutes, whether universities, private institutions or public ones, to which we give. This is money allocated under MOSTI. I know there are many more private entities contributing to research institutions. They do not need to report to MOSTI. They can give directly to universities. They can give to FRIM, or to RII, or give to UiTM, they can give directly. That is not the case here. So, if the money is counted as private-sector contribution, it may already exceed the 2% that an advanced country must allocate. Please. I have not finished speaking yet. This is only the introduction. It has not even started yet, but you already want to ask questions. I have no problem.
Thank you, Honourable Deputy Minister, thank you, Mr Chairman. This is about MOSTI's functions, the core issue, because if we discuss research issues, there are two aspects to research. First, basic science research, basic sciences, where research is conducted to find knowledge, establish knowledge. For example, in quantum physics and so on, in basic sciences. This is not related to applied science. So, one aspect of research is research for, as the Honourable Minister said earlier, improving living conditions. So, what is MOSTI's stance and priority? This is the core issue. Does MOSTI play a role in basic science research, or applied science, or both? I think this is the core issue MOSTI needs to answer. Thank you.
Sekali lagi...
A little, a little. Same.
Silakan.
I refer to what the Honourable Deputy Minister said just now. Say 0.6% is only the fund for MOSTI. This...
I did not say that... [Speaking without using the loudspeaker] I did not say...
Sebab mengikut...
I did not say 0.6% is from my data. What I responded with was 0.5% just now, from... That is not my data.
Ya.
The Honourable Batu must look carefully.
Okay. If I may take this answer from a former Minister who has now moved to the Ministry of Energy, Green Technology and Water, who once answered, saying - This was at a forum at the World Bank. In total, research and investment for Malaysia is 0.6%. So, I want to obtain, is that 0.6% only for MOSTI or in total?
...0.6% of that comes from MOSTI alone, not from the total. That is from the Honourable Minister. Okay, once again, during that interjection, I say again, I have not yet answered, and you have already interjected. In fact, we have a lot of research money. The Honourable Member said it is called the Fundamental Research Grant Scheme (FRGS). That is not under MOSTI's control. That is not under MOSTI's control; it is placed under the universities. They have already handed it over to the universities. They give it among the university research through the University Research Centre. It is called the Fundamental Research Grant Scheme (FRGS). We are a commercialisation fund. After that, if the Fundamental Research Grant has shown that the product will become..., we put in more money, so that in the end it can be commercialised.
So, how do we commercialise the 'Space Programme' with what we spend on the astronaut? How do we commercialise that? Is it commercialising people only, or any products that we will obtain? This is important because this is no longer a research programme to commercialise patterns, to commercialise applied science. This is basic science research.
[Laughter] I want to answer, I will answer later. He said I sent him to school. But Honourable Member, let me tell you, did you read or not, what the Ministry of Science, Technology and Innovation (MOSTI) is? What is the Ministry of Science, Technology and Innovation (MOSTI)? The role of the Ministry of Science, Technology and Innovation (MOSTI) includes technology; science and technology, including the promotion of science, also falls under MOSTI's jurisdiction. The promotion of the fields of science and technology is also under the management of MOSTI. Okay, I will begin my answer. I hope there will be no more disruption to me. Just now the Honourable Member for Hulu Langat talked about whether we do not have a science and technology policy. In fact, we have one policy. Honourable Member, usually your questions are sharp questions. I like the Honourable Member's questions. I know because the Honourable Member is an expert in radioactivity, but did not give advice to friends about Lynas' programme, but never mind. The Science, Technology and Innovation Policy was approved by the government in March 2013. Therefore, what we do, called DSTIM, was formulated to ensure that science and technology continue to be the foundation of the nation and become the key component and focus of the national transformation agenda. This means that what we do is in line with the National Science, Technology and Innovation Policy. That is the first point, Honourable Member. Regarding the role of STI, in 2013 alone, there were 24 programmes to promote and cultivate science. We actually have studies. We really want, if possible, to reach two million students every year with these science promotion efforts.
Now our report has almost reached that target. In fact, this has already been carried out, so MOSTI is very active in this field. Not only do we have the National Science Centre, but we also move to schools. If there are areas of the Honourable Member that request this programme, God willing we will go down to the schools. Almost every day we are fully booked if you look at the exhibitions here and there. We bring all the agencies under MOSTI, 23 of them, to promote the fields of science and technology, and the results are very effective. That is why the Honourable Member for Sungai Petani said earlier regarding science, that in fact the culture of science and innovation is very flourishing in Malaysia. If we look, many activities are reported almost every day in the newspapers: schools' successes in making exhibitions, creating things. Sometimes their standard exceeds that of schools in developed countries. But our problem is that we never recognise the abilities that our own children have done. That is why I said that in fact in Malaysia the culture of education is very well developed. We have no doubt, and our lecturers do research. If we want to give money, earlier some Members of Parliament said I have lecturers who are shouting for money, the money is not enough. I must be clear, yes? In fact, when they apply to MOSTI, MOSTI never decides how much to give, how much, how much, we do not decide, Honourable Member. We send this matter to an evaluation panel consisting of professors and scientists in Malaysia. They will carry out the evaluation, they will read, they will carry out the evaluation, then they call the person to make a presentation. After the presentation, if a second evaluation is needed, they will call for a second evaluation. After that, usually, if we simply give what is requested, some get it that way, but if it is like that, the person is not an expert. So they carry out the evaluation, then they recommend to MOSTI, and only then does MOSTI give the money. MOSTI's job is to give money once the evaluation panel has approved what is needed. MOSTI never decides how much to give. This means they carry out their own evaluation, they recommend to MOSTI, and until now the money at MOSTI still remains even though it is almost the end of the year. We have money, but the research must be research that can be world-class, must be of a standard that can be commercialised, must have– just now the Honourable Member asked because that thing could happen. So for that reason, we are not worried about that culture, because this is a very good culture of education in Malaysia. So in fact I know his problem, he has a little bit. His problem is that after this product has been researched and they want to commercialise it, there is a gap, there is a gap, that is a little bit of a problem. That is why when I entered the ministry, I made this approach, because in the newspapers there was a question in the House. I said that by 2020 I want to commercialise 360 products. I want to announce, if possible, the ministry wants to announce it and we will announce it, and next year it will be called Malaysia Commercialisation Year (MCY). Where we will, that is, we will continue to look at these products for commercialisation. In fact, even so, if we think about it, it is not that bad. In the Malaysia Plan, the tenth...
pergi turun ke sekolah-sekolah. Hampir setiap hari kita fully booked kalau pergi tengok di sana dan sini membuat pameran. Kita bawa semua agensi di bawah Ministry of Science, Technology and Innovation (MOSTI), 23 ini untuk membuat penggalakan bidang sains dan teknologi dan hasilnya sangat berkesan. Itu fasalnya Honourable Sungai Petani kata tadi berkenaan dengan sains itu sebenarnya budaya sains dan inovasi sangat subur di Malaysia. Kalau kita tengok banyak aktiviti hampir setiap hari dilaporkan di surat khabar kejayaan sekolah membuat pameran itu, mencipta itu. Kadang-kadang standardnya melebihi daripada sekolah-sekolah negara maju. Akan tetapi kita punya masalah dia kita tidak pernah mengiktiraf kebolehan yang kita lakukan oleh anak-anak bangsa kita sendiri. Itu fasalnya saya kata kita sebenarnya di Malaysia ini budaya pendidikan sangat berkembang subur. Kita tidak ada ragu dan pensyarah kita buat penyelidikan. Kalau hendak bagi duit tadi ada wakil rakyat kata saya ada pensyarah yang menjerit-jerit hendak duit, duit tidak cukup. Saya kena jelas ya? Sebenarnya apabila dia apply kepada MOSTI, MOSTI ini dia tidak pernah decide hendak bagi berapa, berapa, berapa kita tidak decide Yang Berhormat. Kita akan hantar perkara ini kepada panel penilai yang terdiri daripada profesor-profesor dan saintis yang ada di Malaysia. Mereka akan buat penilaian, mereka akan baca, mereka akan buat penilaian lepas itu mereka panggil orang ini buat presentation. Selepas buat presentation, kalau perlu penilaian kedua mereka akan panggil untuk penilaian yang kedua. Selepas itu barulah mereka selalunya ini kalau kita bagi terus apa yang diminta ialah ada yang dapat begitu, tetapi kalau macam itu tidak pakarlah orangnya. Jadi mereka buat penilaian selepas itu dia rekomen kepada MOSTI dan barulah MOSTI bagi duit. MOSTI punya kerja bagi duit apabila panel penilai sudah meluluskan apa yang perlu. MOSTI tidak pernah decide pun berapa hendak bagi. Maknanya mereka membuat penilaian mereka sendiri, mereka rekomen ke MOSTI dan sampai sekarang wang di MOSTI masih ada lagi walaupun sudah hampir ke hujung tahun. Kita ada wang tetapi penyelidikan itu mesti penyelidikan yang boleh bertaraf dunia, mesti bertaraf yang boleh dikomersialkan, mesti ada– tadi Yang Berhormat tanya kerana benda itu boleh berlaku. Jadi untuk itu kita tidak ada risau tentang budaya itu kerana ini adalah budaya pendidikan sangat baik di Malaysia. Jadi sebenarnya memang saya tahu dia punya masalah, dia ada sedikit. Masalah dia, produk ini lepas dia buat penyelidikan hendak komersial itu ada gap, ada gap, itu ada masalah sedikit. Itu fasalnya bila saya masuk kepada kementerian saya membuat pendekatan itu fasal dalam surat khabar ada satu pertanyaan Dewan. Saya kata sampai tahun 2020 saya hendak komersialkan 360 produk. Saya hendak isytiharkan kalau boleh kementerian hendak isytiharkan kita akan isytiharkan dan tahun depan adalah dipanggil Malaysia Commercialisation Year (MCY). Di mana kita akan buat maknanya kita akan terus melihat produk ini untuk dikomersialkan. Sebenarnya walaupun begitu tidaklah berapa kalau kita hendak rasakan bukanlah teruk sangat. Dalam Eleventh Malaysia Plan...
I want to interject a little.
Timbalan Menteri.
Ini commercialisation.
I have not yet spoken about commercialisation, wait a moment, I will give you the floor later.
The facts given are interesting because I have an answer to this earlier.
Never mind, I will explain again, it is interesting.
I want to ask for a little clarification.
No, I can give you something even more interesting if you want.
For this one, this one.
Okey.
I put forward a question asking the government to list research in the medical field whose results were successfully marketed and commercialised for the benefit of the people of Malaysia over the past five years. This is medical, indeed. The answer is that within the past five years there was one project that was successfully marketed, a project named Projek Megat Terapi. This Megat too, it is also because God gave it, God's creation. Only one in five years. So, out of 22 research results, only one could be commercialised. Where does this leave us?
That is what I wanted to explain earlier, did I not say earlier there is a problem at the end, yes? Did I not say so earlier? I do not know which report that is from, I do not know if it is from MOSTI or not?
This answer is not from this Minister.
Bukan.
I asked the Prime Minister.
I do not know, if I did not issue that form, the answer would not be like that, right? In fact, that is what I said earlier, that is our problem. This research does not have any problems at all, okay, we fund it well. When it reaches the end, who can be blamed, because this must involve cooperation with the private sector. It has not never happened. If we look at the Ninth Malaysia Plan, I will repeat it. We spent RM2.9 billion on this research in the Ninth Malaysia Plan. Patents alone, let us not talk about patents, projects commercialised, 311, alhamdulillah, that is quite good. That was for the Ninth Malaysia Plan. For the Tenth Malaysia Plan, the latest, up to the end of September, when we have spent RM498 million, this means 29 products have been commercialised. There is indeed a problem there, because our people, when they want to commercialise these in-house products, feel it is difficult. It is easier to buy goods from China, it is easier to sell. It is easier to import goods. That is why the Prime Minister said that to achieve a developed nation by 2020, we must become a country that sells technology or produces technology, not a country that merely consumes technology. This means there must be entrepreneurs who can commercialise R&D products. That is why in this budget the Prime Minister announced another new body, a one-stop centre to commercialise products called MaGIC, which is placed under the Ministry of Finance, not under MOSTI. The Honourable Member for Hulu Langat talked about MIMOS.
I, in fact, I was interested in what the Minister said and I agree with what was said. Only my question is, we want to get an explanation to list the projects that have been given funds. We want to know, in principle we know, but which projects have received this funding and what has happened to them? A little more, the concept of R&D. R&D means it can be commercialised, R&D is not discovering new knowledge. R&D is that we research so that a new product can be marketed. If we have invested in R&D and after that it is said that this product cannot be marketed, that means it defeats the purpose of doing R&D.
The Honourable Member for Batu still needs to read more about research. What was said is not quite correct. You can read it again. This is because what must be commercialised in R&D does not necessarily have to be commercialised. When it becomes innovation, innovation, if it is not, it becomes copyright, invention; if there is no innovation, it does not need to be commercialised, that is called - but if it is to be commercialised, there must be innovation. This means that if the result has innovation, it needs to be commercialised; if not, it becomes an invention, no problem. The Honourable Member can read more. There is a lot more information the Honourable Member can read. Never mind, Honourable Member. I am not unwilling to give you the list, but there is too much, Honourable Member.
The Honourable Member for Batu, look at me. Yes, I will read this out. I am not unwilling to give it, Honourable Member, but this list is too long, Honourable Member. For ScienceFund alone under the Ninth Malaysia Plan – 2,834 recipients, for Biotech – 25 recipients, ScienceFund – 10 recipients, TechnoFund – 286 recipients, InnoFund – 365 recipients, CRDF – 154 recipients, TF TechnologyFund – 32 recipients, agro biotech R&D – 41 recipients, genomic – 25 recipients, pharmaceutical – 35 recipients. Many thousands. For projects this year alone, we have already approved more than 1,700, but if the Honourable Member wants, I can give it.
May I get this list?
Yes, there is no problem, Honourable Member. We have a good record. MOSTI has a very good record of listing these things, there is no problem because we have our...
Tulislah.
Yes, yes, there is no problem, Honourable Member, there is no problem. There is no problem because we do have records of that, because every government money that is disbursed, we monitor well. We cannot play around with that matter.
Up to 2013, Honourable Member for Hulu Langat, MIMOS has produced 50 research lab proofs of concept, 19 technology platforms, more than 30 solution products, and MIMOS technology recipients have succeeded in generating RM398.83 million from the commercialisation of MIMOS technology products. Alhamdulillah, that is quite acceptable, though it is small, right, but it is something rather than nothing at all, right. The Honourable Member for Hulu Langat also asked about the National Science Centre, which the RM17 million only has a building, it has been a while. That is only the money we requested, RM17 million, but we have proposed, in fact some states have proposed to request this, under consideration. Melaka also requested to set up a science centre, and Terengganu also offered us a building to be built, but we are considering it. God willing, if I table the budget for next year, I hope the Honourable Member for Hulu Langat can agree with me that we can build a new building. Regarding LPPA. LPPA, Honourable Member, does not do research. The Licensing Board, as the Honourable Member knows, its duties are established under Act 304. I know the Honourable Member is active and can memorise this Act, which was passed by Parliament in April 1984, has carried out the following activities to ensure the well-being and safety of the public. Carrying out licensing activities for companies dealing with radiation. This is its duty. Carrying out and enforcing by conducting routine, periodic and surprise inspections of licence holders, conducting radiological and environmental monitoring of premises holding licences under Act 304. So I clearly remember the Honourable Member on this, that it does not do research, it only regulates. The Nuclear Agency is also regulated by it. The Honourable Member for Hulu Langat also asked about, this is not the Honourable Member for Hulu Langat. This one got mixed up just now, but never mind, the Nuclear Agency. The Honourable Member asked me about the Nuclear Agency, I think the Honourable Member is even more knowledgeable about this Nuclear Agency. In fact, Honourable Member, we want to become a society called 'nuclear ready'. This means our research is aimed at making us nuclear ready. Who knows, if we make a decision tomorrow to change to nuclear as a source of energy, we are prepared. So we will not be belittled by others. So what has happened at the Nuclear Agency is that we are conducting research towards that, and the money we requested is to replace equipment that we have not replaced for a long time with new equipment, so that it is seen to be more sophisticated and can produce good results in terms of research. I think I do not need to go on at length about that. Just now the Honourable Member for Sekijang said the InventQjaya investment was not... no? That one is the Honourable Member for Gopeng, yes? The Honourable Member for Gopeng, InventQjaya is actually ultimately not under me, it is under the Prime Minister's Department through the Ministry of Finance, which has
negotiations, that is at the court stage. That one I cannot answer because I checked just now, throughout my time in the ministry, the word "InventQjaya" has never appeared in my ministry. So I cannot answer that properly, because it is not within my jurisdiction, I apologise, Honourable Member. Yes...
Minister, a moment, please.
Silakan.
Just now I wanted to return to this issue of nuclear ready. I once received a report from MOSTI that about 200-plus sites had once been earmarked as potential sites for nuclear power plant construction, but unfortunately, because these places were not notified, and many housing and other developments have taken place, and many of these sites are now no longer suitable. I want to get clarification: are we also nuclear ready in preparing sites, because we know these plants are quite sensitive if not identified properly, perhaps there will be new controversies. I want to get clarification, whether this remains or not?
Thank you, Honourable Member. The Honourable Member for Batu is someone who looks ahead. In fact, we have no intention. Our nuclear activity right now is only at the research stage. What we have is only for research. We are also not categorised as a nuclear country, because our production is one..., when it is under two- what unit is it, I have forgotten? If that one, it is not counted as a nuclear country. So we have never had any intention. I also do not know where this 200 came from, just as I do not know how the 400,000 Bangla voters came about
[Dewan riuh]
I also do not really know, so I also know about that 200.
Minister, we have had this before, before the Minister- in the previous term. There was a dialogue by MOSTI, where we were informed by MOSTI that there were such preparations. The Minister must check the records again, this dialogue took place. In the previous term, we were informed that in the near future- two, three years, we will launch, preparing a nuclear electricity generation plant, so the Honourable Minister cannot deny the ministry's own records.
I know the capabilities of the Malaysian Nuclear Agency (Nuklear Malaysia), I know what capabilities it has, I know. I know the details of that matter, and so far there is no proposal. Don't worry. It's like there is no proposal to bring 400,000 Bangladeshis to Malaysia. Okay, Honourable Sekijang
[Dewan riuh]
Don't be angry, this afternoon don't be too tense. Don't be angry! Okay, Honourable Sekijang asked me- Actually, for the e-content fund, we have not offered it since the Ninth Malaysia Plan, we have stopped doing e-content. For the Ninth Malaysia Plan, actually a total of 97 projects were approved for this e-content fund, which earlier produced a total of 115 IPRs, comprising 11 copyrights, and 104 trademarks that we successfully obtained. The total amount that we have spent is RM109.12 million. Honourable Sekijang also asked me about MIMOS. Actually MIMOS built a wireless access solution, with permission, called a wireless access point for the Kampung WiFi project. The problem of access speed for village areas is related to the backhaul. Usually this backhaul uses satellite, ADHL or 3G, or these services are operated by Telco companies. The system is good but it is the Telcos that cause the problem. Honourable Gopeng- sorry for being a bit late, but I was helping out in many places earlier. So actually, Honourable Gopeng, your first question earlier was about the weather forecast. Is that right, Honourable? I received an answer from this officer, and I know that department is under my ministry. He said heavy rain in Cameron Highlands, this is technical- is due to convective activity. Rain forecasts are only produced by convective clouds, also called convective, and cannot be issued a week or more in advance
because the lifespan of such clouds is only a matter of a few hours. This answer is wrong. He said the cloud cannot be seen, can only be detected a few hours...
[Bangun]
Wait, let me finish this sentence, then the Honourable Member can interject. This differs from the weather during the monsoon season or the Northeast Monsoon, where the arrival of the monsoon in this monsoon search is due to widespread heavy rain that can be forecast three to seven days before the event. The name itself is a forecast. The name is a forecast, it is not something that is correct, the name is a forecast, so it means we have to accept this because the name is a forecast. If not, then soothsayers would also have to be consulted to find out whether it will rain or not, but the name is a forecast. Alright, please, Honourable Member.
Thank you, Honourable Deputy Minister, and thank you, Mr Chairman. On this matter of rain, I still remember there is rain due to convective activity, rain due to monsoon. That is different- but if we say, for example, that weather forecasts for convective rain are not accurate except a few hours before, this means that every day when we talk about weather forecasts, except during the monsoon period, everything is inaccurate. What we can predict is perhaps two hours, three hours, we cannot predict- okay, tomorrow Wednesday, will it be a rainy day or a non-rainy day. So I think this is an astonishing matter. I hope the Honourable Deputy Minister can explain to what extent...
[Dewan riuh]
The accuracy of weather forecasts in Malaysia. That's my question.
I have already said so. It is a forecast, isn't it? A forecast. I cannot not. Okay, the officer is also competent, he says the accuracy for one day's forecast is 80% to 85%, as he says. Previously there was a case, I have forgotten the case in the US. A person read the meteorological forecast, but I have not verified it, but this is a newspaper I read. He said that when the meteorological forecast said it would not rain that day, he went out, then it rained, so he sued, but the court said this is a forecast. [Laughter] Like a lottery number forecast, whatever forecast. Must we do like that? Perhaps, but that is what is called a forecast, right? This one I understand. I apologise. But it is a forecast. If soothsayers are also called forecasters, right? So I think [Laughter] that too is a forecast. I enjoy the word forecast, in English they sometimes say prediction or something? Okay, Honourable Putatan. I really like this question from Honourable Putatan. When I first entered Parliament I was interested in this Honourable Putatan. Until now I just follow him. His questions sometimes leak, sometimes they don't leak. He asked about the management of TPM. For your information, MOSTI once applied for the development of technology parks in Sabah and Sarawak under the Ninth Malaysia Plan, but this application was not approved. Therefore the management of TPM under MOSTI is not the same as the management of the technology parks in Sabah and Sarawak that exist now. Yes, that is not ours. It is a coincidental same name. We have Technology Park Malaysia, TPM Sdn. Bhd., a company under the Ministry of Finance. That one is truly a technology park, a science park, right? That one is different, this Technology Park is the name of a company whose purpose is to commercialise products. This is under TPM. So actually, Honourable Putatan, I also discussed this with my officer. I said why not also build a technology park in Sabah and Sarawak. As it happens, the Honourable Minister also comes from over there, right? So I think he spoke to me about this matter, God willing we will consider these matters, but Technology Park Malaysia is not the technology park that exists there. A technology park like the one in Bukit Jalil, we will build in Sabah and Sarawak. That one we will consider.
Honourable Minister, I ask for this explanation. Because the one who announced the Sabah technology park was
the Honourable Minister of MOSTI himself. At one time when the current Honourable Minister was at the Ministry of Energy, Green Technology and Water, he made the announcement. So how is that? So when I asked about the technology parks in Sabah and Sarawak, MITI said this is under MOSTI. So please say which one is correct.
Okay, okay. Actually, Honourable, when I first held the position of Deputy Minister I was also confused about this, but now I am clear. Actually, when we say technology park, the one under MOSTI is Technology Park Malaysia. This is the one people often get confused about. The technology park that is meant to be built in Sabah and Sarawak is a technology park, a science park, in which there are industries and so on and so forth. That one is called a technology park. This is Technology Park Malaysia. The company name under MOSTI, under the Ministry of Finance. So that is where the confusion arises, because that technology park is for building a science park like when we want to build housing. There is a housing estate, this is an industrial estate. So whatever the case, they already tried to request it, they said in 2009 it did not materialise. However, God willing, I can look at what happens after this and I will inform Honourable Putatan. God willing, if I have the authority to give that matter, I will give priority in that field. As for the biotechnology graduates just now, someone told me about biotechnology graduates, right? Actually, the ones who are not working, who is that just now, is there? Honourable Gopeng or what? The one who asked me about unemployed graduates just now. Yes, Honourable, right? Honourable, actually I admit this has happened to some extent. When we first started, everyone wanted to study biotechnology. I think about 10 years ago, that's right. So at that time universities were racing, I was working at a university at that time. Many universities wanted to set up biotechnology faculties. Yes, many. I admit that at that time I was Head of Department at Universiti Sains Malaysia. Then I saw that when many had graduated, we had a bit of a problem. Because we seemed not to be ready with those companies, as they could not work with private companies because there were not many. Even if there were, only one or two. So this is not MOSTI's responsibility, but MOSTI is working towards that. So actually through BiotechCorp we have been very active. We have also been able to include funds. I have seen in that allocation and we also recognise what we do, we give grants to them, and these companies must be companies registered with BioNexus. If I am not mistaken, there are now 22 BioNexus companies in our country. So all of them work in the BioNexus companies. At Biotech itself there are not many, because we do not do research in that field, but I see Biotech...
[Bangun]
Just a moment Honourable, let me finish this quickly, Honourable. Actually, with the existence of Biotech, BiotechCorp, we encourage many investments to come in the field of biotechnology, we initiate, we make collaborations, and thank God, but how many can we employ? However, God willing, many of them we have already, we have taken them in to work, but not under MOSTI, from companies under the BioNexus companies, where MOSTI is responsible for creating or giving clarification to the companies concerned. I give the Honourable Sungai Petani a moment.
Honourable Kuala Krai, Kuala Krai. Thank you Honourable Deputy Minister, thank you Mr Chairman. The Minister mentioned just now that at that time, 10 years or more ago, higher education institutions raced to offer biotech courses. I think this racing was actually caused by government policy to enhance biotechnology in our country because we were seen to be moving in that direction. So our IPTs took the initiative to provide space for this knowledge to be taught. Thus many of our students took it.
Like in the 1990s when we talked about ICT as the flagship that we promoted back then, so many took ICT. Thank God ICT has grown and provided employment space for our children. However, this biotech that was raised just now was initiated by the government, but no opportunity was provided for them to work. I am concerned that most of those who graduate will ultimately have no other way but to teach biology in schools. It is not that it cannot be done, but it would be meaningless compared to what the government originally intended. Thank you. What is the Honourable Deputy Minister's view?
Thank you Honourable Deputy Minister. I share the opinion of Honourable Kuala Krai just now. Because we know that when we have undergraduates of calibre, who have received training in biotechnology, it is a waste when they cannot pursue their careers in biotechnology. However, I appreciate all the efforts made so far. But I feel that what has been done so far is still not enough to solve the problem of the many graduates in biotechnology who are still unemployed, who are doing sales, who are doing work unrelated to biotechnology. Coincidentally, I do agree that biotechnology is a field that is so important, that has such potential for our country. But we have failed to make use of the advantages that we have. Thank you.
Actually I did not say, I do not like the word failed. Actually we have to look at this as not solely the government's responsibility. The government has provided funds, we have spent money, we set up BiotechCorp. We see in the north there is Kulim Hi-Tech Park. In Melaka there is also, many in Melaka. Actually we have tried to do it, and we return to the point that sometimes we should not look at only one side. We look at the other side too. Our people, sometimes products produced by us, they also do not really look at them. That is another problem. When I said promotion. If this is a biotech product that comes from Malaysia, that one, thank God, can be used. But sometimes products we produce, Malaysians do not want to buy them. So how is that to be done, how can a business be expanded? However, the government has carried out its duties as well as possible. With BiotechCorp, we also set up spin-off companies, we give grants for all research. We also continue to find BioNexus companies, and this is the role of the government, and the government has done its best. It is up to the private sector to take up the challenge that the government has laid out. Okay, Honourable Batu just now. Is he no longer here?
Ada.
He is here, he is here, I did not notice, sorry, sorry. I did not see him because he was busy chatting over there earlier. Okay..
Honourable Minister..
Ya?
Saya punya...
Yayasan Inovasikah?
Not finished yet?
Not finished, not finished yet, sorry, I made a mistake looking at this. For the Innovation Foundation just now. Actually the Malaysian Innovation Foundation (Yayasan Inovasi Malaysia) this..
[Bangun]
Honourable Member, let me answer briefly first, then I will give way.
[Speaking without microphone]
Apa dia?
Want to go back again to the matter of biotechnology.
Okey, boleh.
Ringkas sahajalah.
[Dewan riuh]
He is giving way. Eh, who is the Speaker? Who is the Speaker?
[Dewan riuh]
Whose floor is this? Come on, Honourable Deputy Minister, Honourable Deputy Minister. [Interjection] I want to quote the Deputy Minister's words, that the Deputy Minister does not like the word 'gagal'. But that word exists in the dictionary, for a reason.
[Dewan riuh]
Because sometimes failure is indeed what results. I think the government must admit that after making efforts and presenting a vision that Malaysia is a country rich in biodiversity, and once predicted that the market for the products of this biotechnology would reach billions. I cannot remember the exact amount that was mentioned earlier. However, that potential could not be realised, and this government....
Honourable Minister, Honourable Shah Alam is only taking attendance. That has already been answered earlier. [Laughter] It is unfair to us who have been waiting here.
When did he answer? Earlier he talked about not liking things that fail.
Honourable Shah Alam has only just arrived. Just arrived, no need to answer. He is wasting my time, I want to hear the answer from the Honourable Minister.
Teach him about meeting rules. [Laughter] He has been a Member of Parliament many times, still has not learned.
He is only taking attendance.
I came in this morning, Honourable Putatan. If you want to take attendance, you don't need to come at all. So I think the government must admit there were mistakes, there were shortcomings and it has failed. When we admit that, then we will think again. Do not just wash your hands of it. Because I see in Malaysia, under Barisan Nasional, many visions that were originally put forward, after that when they were not successful, were left to rot. As an example, heavy industry, heavy industries, PERWAJA wanted to make steel and so on, in the end the country lost and suffered losses of billions. On the automotive industry, until today Proton has failed. On the Multimedia Super Corridor, Cyberjaya is still there, half of it is like a haunted town. The same goes for biodiversity. The potential is indeed there. So the government should have considered where it went wrong and what needs to be done to ensure that this technology and this field can be developed so that graduates from these universities can be used and benefited from. Admit the failure. That is the very beginning. Admit your mistakes, admit where you went wrong. Admit where you failed. Then you come out with a new plan. But do not wash your hands afterwards and blame the people or say the people do not want to buy Malaysian products. Blame the private sector, the private sector does not want to do this, does not want to do that and so on. Yet investment has been hundreds of millions, if not billions. What is the Honourable Minister's view?
Saya ingat...
Not going to answer?
First admit that the 40,000 Bangladeshis never existed. I think, Honourable, to admit it, did those 40,000 who came as phantom voters exist or not? Admit that first.
Yes, I think the Honourable Deputy Minister also did not follow the debate earlier.
Tak, tak...
tak, tak, I go back to the fourty thousand bangla tadi. Saya...
No, no, earlier...
[Speaking without microphone]
Yes, Honourable Shah Alam and Honourable Deputy Minister. Honourable Shah Alam, Honourable Deputy Minister! I, cannot be like this. No need, no need to answer. The one who answers, Honourable Deputy Minister, Deputy Minister, I am speaking with the microphone off. The one who answers is the Honourable Deputy Minister, Honourable Shah Alam, sit down.
Okay, I will answer, I will answer.
Don't bring up things that have nothing to do with it.
Yes, yes, yes.
To the Honourable Deputy Minister, do not raise issues that have nothing to do with it.
Yes, please. Still have more?
Okey.
Panjang lagi?
I can go on for long or keep it short, whichever you prefer. No problem at all. [Laughter]
Honourable Deputy Minister, if the Deputy Minister thinks a short answer is sufficient, then please keep it short.
Okay, all right. In that case I will keep it short. Regarding the Malaysia Innovation Foundation (Yayasan Inovasi Malaysia) just now. The Malaysia Innovation Foundation is an agency; it does not fall under that allocation. The Malaysia Innovation Foundation was established to encourage grassroots innovation. In other words, its work is to dig up the innovations of the people. It goes to the villages, it goes to the universities, it goes everywhere to obtain these innovations, and it publicises them and gives them publicity, and it hopes that these innovative products, after they are fine-tuned a little technically, can then be commercialised. If the Honourable Member for Putatan has time, he can come with me later. We can look at the exhibition space of the Malaysia Innovation Foundation located in Cyberjaya. [Interjection] Have you seen it? Have you got it? Okay, good. That is part of what we are doing. Okay, is the Honourable Member leaving already? Okay, thank you. [Laughter] Okay, the Honourable Member for Batu just now, if I am not mistaken, the Honourable Member for Batu asked me the most important question, did he not, about the radioactive display just now? He can get it under three options. The first, he can do it at the Gopeng Police Station. The second, in front of the entrance of Lynas. It is online, www. .... I will check, he gave it to me here, I forgot just now where it is. Can you write it down for me again? www. What was it? It's gone from here. He gave it to me just now, but I made a mistake, I don't know where I put it. Okay, www.aelb.gov.my. Yes, you can get it there, www.aelb.gov.my. The readings can be viewed directly by the public right at the entrance of Lynas and at the Kuantan IPD if they want to read them directly. We have them under this week.
The Honourable Member also spoke about the PDF. In fact, he has already submitted the PDF, we are drawing up a plan, and we have never allowed the PDF to be done outside the Lynas area. It must be within this area. He has submitted it and we have not, we are still doing the evaluation, but not outside the Lynas area. As for the Honourable Member rebuking me about the soy sauce factory, the actual story is as follows, Honourable Member. Just now the Honourable Member also heard it, listen carefully, it went onto YouTube, but I admit I said it, I said the following. Honourable Member, listen carefully. You read it again, okay? About the newspaper that spun it, and I am glad it has already spun it. I said that he, I came, I said he asked Lynas. I said, the Lynas factory is safe, like the soy sauce factory, as others have said. I did not say I said it. But that sentence was not used in the newspaper. However, I was glad anyway. That factory is indeed safe, because that factory really is safe and has met everything that is required under the act we require. So that factory is safe, and if I were to talk about these experts. The story is, I am not a radioactive expert, but I have an agency under me that covers all that. Praise be to God, I am satisfied, and I say that factory is a safe factory. So, that matter, if we look at it, even outsiders agree with us that we have high expertise in that field. I think the Honourable Member for Hulu Langat can agree with me. It has happened, two or three of our people. One, Professor Dato' Dr. Nor Ramli Muslim, was once Deputy Director General and Head of the Department of Technical Assistance and Corporation of the International Atomic Energy Agency (IAEA) from 1986 to 1992. We have already been referred to in the atomic field. Second, now Dr. Dato' Daud Mohamad, from January 2011 until now, Deputy Director General, Head of Department of Nuclear Science and Application of the International Atomic Energy Agency, who is still serving and is the person who advised me on expertise regarding Lynas. Yang Mulia Dato' Raja Abdul Aziz bin Raja Adnan, who will be retiring soon. He was the Director General of the Atomic Energy Licensing Board. He started in January 2004. He will become Special Advisor to the Director General for Policy Coordination and Implementation at the International Atomic Energy Agency. Meaning we have been given the responsibility to carry out that matter. As for the Honourable Member for Bakri just now. The Honourable Member for Bakri, I will summarise any of the other ones. The Honourable Member for Bakri, is he not here? Is he here? Okay.
As for research engineers now, the total number of research scientists and research engineers for natural science is 26,563, engineering and technology 22,071, medical and health sciences 8,580, agricultural science 3,412, social science 8,909, and humanities 4,217, bringing the total to 73,752 persons. I am giving this off the cuff, but the current number of scientists per 10,000 employed in Malaysia to date is 58.2, and by 2020 we want to reach 72. That means we have another seven years, God willing, we will reach it with the programmes we have. As for the commercialisation of the product just now, the Honourable Member for Hulu Langat, I have already explained. As for the Honourable Member for Stampin. The Honourable Member for Stampin, I think I want to listen to what the Chairman says. I want to be a good people's representative, actually. That is why I come every day to hear what they say. Honourable Member, I have actually already answered your question in the oral question. You were present for that question. So, since the matter has already been resolved, and I see the Honourable Member also had that clipping and showed it to me when I was answering earlier, I think that was the answer, even though it was only one page. A lengthy answer is not necessarily accurate, but a one-page answer can also be an accurate answer...
[Bangun]
Honourable Member, I have already answered that question on behalf of Remote Sensing Malaysia. Yes? I don't think...
There is no need, Honourable Member, to go on at length. That is all I answered. Whatever the Honourable Member says, that is my answer, because this matter has been settled through arbitration.
I do not agree, Honourable Deputy Minister. May I interject briefly?
That is up to the Honourable Member. There is no need. I think that is all my answer.
Who is responsible? Mr Chairman...
Honourable Member for Stampin. I must ask the Honourable Deputy Minister...
No need. I think I have answered that question many times. There is no need, Honourable Member. Alright, I will continue with the other answers.
What is the use of me asking a question in Parliament if the Honourable Deputy Minister does not want to answer? Mr Chairman...
No, no. That question has already been answered in the question.
My question is who is responsible for the RM88 million that went missing? Mr Chairman, the Honourable Deputy Minister cannot answer.
In that answer, of course, if MOSTI is responsible...
My question, my question is who is responsible?
Honourable Member for Stampin, Honourable Member for Stampin.
It is not that we did not answer that question. I have already answered that. I have already answered that under MOSTI.
Jadi?
Of course our ministry is responsible for that matter, and that matter has been settled through...
Why did that happen?
It has been settled through arbitration. If we continued with that product, we could have incurred a bigger loss of more than RM300 million. So we had to end the matters explained in the answer, and so we brought it. He sued us, and then we took it to arbitration and we paid RM80 million.
Why were we sued?
Of course MOSTI must be responsible for the matter, but this matter has already been settled. That is why it does not appear in the audit report, because we gave a good answer and that matter no longer causes a crisis.
Mr Chairman, Mr Chairman, my question is who is responsible and why it happened.
Honourable Member for Stampin, Honourable Member for Stampin. Honourable Member, please refer to Standing Order 37(1)(b), which explains that when someone is answering, interjections are not permitted without their consent.
I understand, Mr Chairman, but the Honourable Deputy Minister is not answering my question. What is the use of me
asking a question if the Honourable Deputy Minister does not want to answer in this august House?
I have answered the question from among the questions that exist.
How many times?
Honourable Member has even shown me and said, oh, this is a one-page question only. A question that is one file does not necessarily have an answer.
May I read the Honourable Deputy Minister's answer, please?
That answer is already available.
That is RM88 million in compensation, but my question is why did this happen? Who is responsible?
Yes, I have already said earlier that this allocation is under the Ministry of MOSTI. Of course MOSTI will be responsible, but we have already explained why that matter happened in the answer.
There is no explanation of why it happened. Only RM88 million in compensation.
Okay, I will answer. That means our ministry is responsible. That is the answer he wants.
Why did it happen?
Ya?
Why did it happen?
Mungkin...
Surely RM88 million did not just disappear?
This is not a disappearance. As I said, this is a procedure we must carry out. Because a failure occurred there, we could not continue. If we continued, we would have incurred a loss and had to pay RM330 million. Therefore, we stopped that work and he sued us, and we settled it.
Is this due to incompetence on the part of the Director of RSM?
The problem is that the matter was not viable at that time. So I think I will stop there, Mr Chairman. I think there is still a lot I need to answer. I will answer the written questions. The Honourable Member for Sungai Petani just now, I see he is not here either. So I think that is all my answer. I thank all Honourable Members who have cooperated well, and I hope we can advance the nation's science for the future. That is all, peace be upon you and the mercy and blessings of God.
Thank you, Honourable Deputy Minister. Honourable Members, the question is that the sum of RM734,791,000 for Purpose B.30 under the Ministry of Science, Technology and Innovation to form part of the Schedule be approved. [Question put and agreed to] [The sum of RM734,791,000 for Purpose B.30 ordered to form part of the Schedule]
The question is that the expenditure of RM618,476,000 for Purpose P.30, mentioned in the Development Estimates for the year 2014, be approved. [Question put and agreed to] [The sum of RM618,476,000 for Purpose P.30 approved as part of the 2014 Development Estimates]
Bill — Supply Bill 2014 Second Reading and Development Estimates Motion 2014 Committee — Clause B.43 [Schedule] - Clause P.43 [Development Estimates 2014]Bill
Supply Head B.43 and Development Head P.43 under the Ministry of Urban Well-being, Housing and Local Government are open for debate.
The Honourable Member for Lenggong.
Thank you, Mr Chairman. I thank you for being given the opportunity to debate at the committee stage for the Ministry of Urban Well-being, Housing and Local Government. I wish to refer to B.43 08000 – Malaysia Fire and Rescue Department (Bomba dan Penyelamat Malaysia). Firstly, I would like to congratulate the ministry, the Honourable Minister and the government for making early preparations. I read the media statement earlier that towards the end of this year, many civil servants and many people are on leave, but the leave of Bomba staff and officers has been frozen as preparation for the possibility of natural disasters, especially floods, during the end of this year. I thank the ministry, which always pays attention to the welfare and problems of the people, and this is certainly evidence of how a responsible government makes early preparations to ensure that the difficulties the people are expected to face can be addressed in advance. That is why I record my congratulations and thanks to our Bomba personnel who sacrifice their time by preparing themselves to help in facing such problems. That is why I think the ministry must take steps to look at matters related to the welfare of Bomba staff so that the services they provide can be better, with improvements that I believe are always being carried out by the ministry. I take this opportunity, I think what I have said also involves Gerik as well, because we are neighbours, the same municipal council area. Honourable Minister, in my Parliamentary constituency and also near Gerik, development is increasing, needs are growing, the population is large, and land is available, and that is why I ask the ministry to pay attention and, if possible, approve the upgrading of the fire station in Gerik. Land is available in my Parliamentary constituency at Kampung Padang Kunyit to enable a large fire station with greater services to be built. Besides that, since there are many villages across the river in my area, villages that are quite difficult to serve through the regular Bomba service. That is why I hope these villages, for example in my area at Kampung Beng, Luat, Chepor, Bukit Sapi and so on, the villages across the Perak River where, if a fire occurs, it is very difficult for Bomba to reach the location, let alone when we mention settlements of the Orang Asli.
I know Bomba has volunteer fire teams, but these volunteer fire teams are mostly set up in new villages. I hope, the Minister is a young man, he understands, and I think the time has come for us to expand these volunteer fire teams to also be placed in traditional villages, in the villages I mentioned earlier, so that our services to assist and rescue can be improved. The second point I want to mention here is P.43 Item 04000 – Urban Poverty Eradication Programme. Because today the situation is changing, although we know that various initiatives we undertake to increase people's income, the reality, which we also know and the government also understands, is the need to expand contribution and assistance programmes for urban poor groups. I hope the programmes carried out before will be increased. Apart from focusing on large urban areas, I hope small areas such as my constituency, Lenggong, will also be given main attention, because in those areas there are also groups in need of attention in overcoming poverty, such as housing, rental housing, assistance programmes and so on. The last point, briefly. Item 02101, Item 02102 and Item 02104 – National Landscape. Honourable Minister, I ask for the Honourable Minister's help to carry out a project to beautify this urban area. Because my area is the Lenggong Valley World Heritage Site, and now after the declaration, it is visited by many foreign tourists, including researchers from all over the world. I hope, I request the Honourable Minister's help to allocate financial funds that can help improve landscape facilities in the buffer zone of this World Heritage Site, most of which are within the municipal council area, so that the area can be beautified with good landscaping. I hope the Honourable Minister can help. For that purpose, I believe the local municipal council in my area has already submitted an official application to the ministry. I ask that this be given attention so that it can make the area a beautiful place, and of course it will help. Besides beautifying the area, it can increase the attendance of many tourists and certainly help increase the country's income. I think that is all, Honourable Minister, and thank you, Mr Chairman.
The Honourable Member for Sepang.
Thank you, Mr Chairman. I wish to debate Item 030000 concerning the Home Buyers Claims Tribunal. Next, I will debate briefly on Item 040000 – National Housing. Firstly, regarding the Claims Tribunal. Based on this report, it is stated that the filing cases, the cases filed at this Tribunal in 2012, amounted to 3,193 cases. However, in 2013 it fell to 1,100 cases, and it is projected that in 2014 it will rise again to 4,200 cases. My first question, Honourable Minister, why did this decrease in case filings occur? Is it because of technical problems or the like? I ask the Minister to explain. Secondly, Honourable Minister, I think that in terms of public awareness of the existence of this Tribunal and its functions, it may still not be comprehensive. I hope the Minister's side can do something to create awareness, especially among home buyers, of the existence of this Tribunal. This is because with the existence of this Tribunal, it can to some extent reduce bureaucracy if one goes to court, as well as costs.
Only one more point, Honourable Minister. I think, as with the Consumer Tribunal, when this Tribunal exists, the problem that usually arises is after the decision is made, when any party that is dissatisfied will file a judicial review. If we look at cases involving this Tribunal, usually the buyer can be said to be the weaker party against the developer, who may have stronger financial resources. So, we will face ....versus ..... like this. So I wish to propose that, if necessary, there should be legislation to set a cap, meaning in terms of the cost of filing this judicial review. I believe that when we go to this Consumer Tribunal, there is no cost element. However, when we bring a case to court, it is assumed the consumer loses and wants to challenge the Tribunal's decision in court through judicial review, the issue is the issue of cost. They have to engage a lawyer, and if they lose, they will have to pay costs that may be high and so on. So, I hope the ministry can think about how we can– We want to close the door on judicial review, which may be difficult because the decision may also contain errors. However, the worry about costs sometimes causes them to be unable to get a defence and so on. That is the first point, Minister. Secondly, regarding the issue of National Housing. According to this report, the People's Housing Projects that were completed in 2012 amounted to three projects, 2013 seven projects, and in 2014 nine projects are projected. I want to focus on the Sepang District or Sepang Parliamentary constituency. The first question, Minister, how many People's Housing Projects have been built in the Sepang Parliamentary constituency? That is the first. Secondly, how many has the government built, and how many have been completed or will be completed and so on? Thirdly, how many housing projects in the Sepang District have been abandoned, and what steps have been taken by the ministry to resolve this issue? Thirdly, more specifically, Minister, regarding the issue of land subsidence at Taman Indah KLIA involving 44 houses. They came to me to make a complaint, and I saw many documents and correspondence sent to the relevant parties. So, I hope the Minister can look into this issue because they have already bought the houses, but the houses have experienced land subsidence. Therefore, they are very worried about safety. I hope this issue can be resolved. Usually when we send letters, there is some follow-up, they come and patch things up, and after that it happens again. I see there is no comprehensive solution that satisfies these buyers. So I hope the Minister can look into this matter and find a formula for a solution. Next, Minister, there is another issue that I think is important and has also become major news in the media regarding the case of – Although this case involves outside Sepang, the issue involves a principle that I think the Minister needs to explain. Regarding the issue of several houses, buyers at Taman Suria Permai, Taiping, involving– This case is a classic case in which the buyers become the victims. For the information of Parliament, in this case, the buyers had already bought houses from the developer, namely KS Properties. After purchase, they paid the house price, and some had completed the purchase, but what happened was that the developer borrowed money from the bank, namely Maybank, and charged all the buyers' land to the bank. This I think there is– I will explain later. When this happened, eventually we know the developer failed to repay the debt, and the debt was classified as non-performing loans (NPL), and finally, the bank sold the NPL to a foreign company, namely Gale Force Sdn. Bhd., a foreign debt collection agency, with permission.
In the end, this foreign company wants to obtain the houses. So this is a situation that truly brings oppression to the buyers. They have bought the houses and paid in full, the developer charged them without their knowledge. The bank then sold the NPL, and in the end, they are the ones who become the victims, to the point of what was reported in BH, how the oppression is such that the water was cut off, and TNB cut off the electricity. After that, when they went to court, with only one letter, not from a court order, only one letter from the Deputy
Registrar of the High Court Taiping, Raja Shahrin Anuar Raja Baniamin, requesting that the party carry out that action. So this has raised a major issue. I feel this issue arose because of weaknesses in the Housing Development Act, where we know that in the relevant Act, this S&P or sale and purchase agreement, is statutory in nature. In other words, this sale and purchase agreement is not an agreement where the buyer and seller can simply agree on terms as they please. This is an agreement that has been stipulated. Once it has been stipulated, it contains several loopholes, with permission. I hope the Honourable Minister's side will take serious note of this issue. Among its weaknesses is that there is no provision that prevents the developer from charging the entire land. This means the buyer pays the developer, the developer charges the land, and it can charge the whole land, and when it does not pay. What is better is that before selling, they can charge, and after selling, they can charge several times. They can take out loans several times. So there are weaknesses in the law and also in the S&P. So I hope that the ministry, if necessary, we legislate a law to amend it, do it. What is important now is that the buyers must be protected. They should not experience a nightmare, like this, with permission. They have bought houses, have paid, have lived there for a long time, and suddenly the land is to be auctioned by an outside company. What is surprising is how Bank Negara could approve this? This is because this report states how what was done is contrary to BAFIA. So these are all issues that should not have happened. So I hope the ministry can take serious note of this matter because we do not want this to happen again. So I hope for an explanation and also intervention from the ministry regarding this matter. Finally, Honourable Minister, regarding the owner group. I feel the Honourable Minister certainly– I did not say the government. The government may also be thinking about this matter, but I feel that even though we set it for those with incomes of RM3,000 and below, the government will offer to build affordable houses at a price of RM42,000 and so on. But what we are worried about, Honourable Minister, is with the current living situation, with the increase in building materials, especially the price of cement. Perhaps after this there will be GST, goods prices will rise, inflation, and when water tariffs are implemented, electricity tariffs will be raised, meaning the cost of living keeps increasing over time. So at that time, even if they buy, we worry they will not be able to, with permission, service the loan. So we hope a mechanism can be created so that an affordable house is not only something they can buy but they will not feel worried when they buy the house. That house will not be auctioned if they cannot pay. So I wish to propose to the Honourable Minister that if possible, we adopt the system made by the Singapore Government regarding the SDB housing. Here I wish to share with Parliament how the Singapore Government, among other things, solved the housing problem in their country, where the SDB was established since 1960 to, among other things, solve this housing problem. We know that in Singapore now, the SDB has succeeded in solving this housing problem. What is stated here is that among the efforts for the Singapore Government to give people the opportunity to own these houses, firstly they have the hire-purchase concept just now. For example, they are allowed to rent for several years, and after several years, priority is given to these tenants to own the houses, by looking at their income. Why? When their income– meaning each person is different. Their income will be assessed in terms of the amount of loan repayment. I want to read it out here. Among them he said, the SDB sells flats to existing tenants at a discounted rate with a price of 100% financing. That is the first step taken. Meaning they sell flats to tenants. The tenant rents and after that is sold at a discount with 100% financing. That is the first.
Then the SDB will also buy back three-room flats from the open market to sell at subsidised prices to families with an income of less than SGD1,500 at that time. The subsidy is SGD50,000 for each three-room flat. After that, the sale of four-room flats with a slightly smaller floor area and simpler finishing, tenants who apply for four-room flats under the flat registration system are given an early head start of six months compared with non-tenants in the allocation of flats. The condition for this is that the tenants must be first-time buyers and have occupied the rented flat for at least five years. After that, the rent-to-own scheme will allow families with low monthly incomes between SGD800 and SGD1,500 to first rent and then later buy the flat. So I think this hire-purchase scheme is a very viable scheme because, just as for people who cannot afford to buy vehicles, with this rent-to-buy scheme they can more easily own vehicles. So I hope this rent-to-buy scheme can perhaps be introduced or expanded within the housing industry. That is what I wish to convey, and I hope that the Honourable Minister, in the policy-level speech, I asked the Honourable Minister about the issue of the Taman Dengkil flats, the Taman Permata flats. The Honourable Minister said there is already light at the end of the tunnel. Now I want to ask the Honourable Minister, is that light really already there? What is the latest that has been agreed upon by the Federal Government and state government regarding the construction of houses to be given to the residents of those flats? I hope the Honourable Minister can answer this matter. Thank you, Mr Chairman. Thank you, Honourable Minister.
Yes, the Honourable Member for Titiwangsa.
Thank you, Mr Chairman. I wish to debate Item B.43, Item 020300. In this item there is the licence of moneylenders. I wish to ask the Honourable Minister that in the report we see, it is expected that 1,500 licences will be renewed in the coming year, 2014. It is expected to be renewed. I wish to ask the Honourable Minister, so far how many cases of fraud through these licensed moneylenders are there, and are there cases categorised as extortion while collecting loans that have been given? This is because generally nowadays I see that many of these lenders use these legitimate licences but run businesses like loan sharks, using violence to collect these moneys and not using the normal collection processes carried out by banks or finance companies. Secondly, I also want to ask the Honourable Minister's side. Does the ministry have the expertise to monitor and carry out enforcement against holders of these licences?
This is because, as we know, at the bank level, Bank Negara is very efficient in monitoring these banks, in terms of monitoring according to the guidelines that have been set. However, for cases of these moneylending licences, generally most of them are companies that do not have staff like those in banks. So, I want to know, how is this monitoring carried out, does the ministry obtain guidance from Bank Negara Malaysia? Thirdly, I also want to know, what is the maximum amount of interest that can be charged by these moneylending companies? Will their licences be revoked if they breach the rules that have been set? One more matter, I also wish to refer to Item 090000 under sub-Item 090100, namely National Solid Waste Management. I see the allocation that
...the allocation is this large. However, I would like to ask the Honourable Minister about the government's proposal to build an incinerator that will be introduced in our country. Although somewhat late, I believe the incinerator is a very necessary solid waste disposal technology if we want to move towards becoming a developed nation. If we look at the many comments and complaints we receive from local NGOs, they are rather less trusting of this incinerator. So, I would like to propose to the Honourable Minister: could a portion of the budget be allocated to bring these NGOs to countries such as Singapore, Korea, Taiwan, Japan and also European countries to see how they operate these incinerators? Some of these incinerators are located in residential areas. It could avoid the transportation of waste as we do today, where we have to take waste from the transfer station at Taman Beringin 50 kilometres to Bukit Tagar. So, with these incinerators, if we can bring NGOs, community groups or community leaders to see how these operations are carried out in developed countries, it will certainly reduce the misunderstanding or pressure from society as a whole in an area where the incinerator will be built. Next, Item 130100, I see there is a one-off payment of RM35.5 million. I am not quite sure, but this is a payment to the operator of the disposal facility at the Taman Beringin transfer station. If I am not mistaken, Taman Beringin is operated by Kuala Lumpur City Hall (DBKL). Is this payment part of the allocation given by the Ministry of Housing and Local Government (KPKT) to DBKL to cover the costs incurred by DBKL? I would also like to ask about Item 04000 – Urban Poverty Eradication Programme, amounting to RM55.1 million. Could the ministry tell me what kind of assistance is given to the urban community to eradicate urban poverty? Does it involve free rent, or PPR flats for those who are eligible? Finally, I would like to refer to Item 01513 – Owner-Occupied Public Housing Programme. As we know, today, especially in the Federal Territory area, some PPR flats have been offered to owners or tenants to purchase at a price of RM35,000, whereas I understand that building one PPR unit costs RM160,000. So, I would like to propose to the ministry that the policy of placing in a PPR block some who rent and some who own the property has, in my experience, generally been difficult to manage in terms of collecting service charges from the owners. So, I would like to propose to the Honourable Minister: can we not look at these PPR flats by dividing them into two categories? The first category is PPR flats purely for rental. Second, the government finds land, and this land is fully subsidised for the private sector, which is invited to build these PPR flats, but the PPR flats built are sold directly to anyone or those who are eligible to buy at a price of RM100,000, RM170,000, RM180,000 or below RM200,000, with the cost of the land subsidised by the government. Compared with what the government does today, the land is the government's, the building is the government's, and then it is sold at RM35,000. Then we mix people who own homes and those who do not. So, I ask, if possible, for a policy that differentiates this government assistance in terms of helping urban people in particular to obtain homes to own. Thank you, Mr Chairman.
[Bangun]
Yes, the Honourable Member for Seputeh.
Thank you, Mr Chairman. I would like to refer to Item 050100 – Local Government. Mr Chairman, we know that local government is very powerful because it determines the rate of taxes, whether projects are approved or not, and also urban and rural planning. If we look at the state government, we have the Menteri Besar, followed by the Exco. If we look at local government in a state, where the YDP or Mayor is, if we look at it, the YDP or Mayor is like the Menteri Besar of a small state, and the councillors are in fact the Exco of a small government. And here I feel rather regretful that in our current system, these local government officers are all in one closed service. So, if they are appointed, they are paid as an officer in one Local Council, so they will stay there forever. If such an officer has expertise and potential or is indeed a clever scholar, he still remains in that local government and cannot be transferred, perhaps to a ministry or any other agency, unless they can be loaned out. Under the Selangor State Government, we once tried, we gave a variety of experiences to officers at director level in local government, and we tried to transfer officers from the Subang Jaya Municipal Council to the Sepang Municipal Council, and from PJ to Klang and so on. However, under the law, it should not be done. And we once tried to transfer a director-level officer, wanting to transfer him from PJ to Klang. Then he refused to go, because he felt this was a demotion for him. In fact, this was not the intention of the state government. Subsequently, the officer brought this case to court, and he won in court, because if he is paid by one Local Council – let's say MPPJ, he will remain there forever.
We face this problem because if an officer has been in one position for decades, he has his own network. So he becomes like a 'king' in one field, and everyone is forced to – we say 'kautau' to him. If he is a good director and a good officer, there is no problem, because everyone is comfortable. But if the officer has problems in terms of attitude and so on, he stays forever and it will be very difficult to transfer him. He has to remain there in one local government. In fact, I once proposed in this House when the Honourable Minister was still a backbencher, and he also agreed with me via SMS. The Honourable Minister, who once agreed with me privately, can we look at whether we can change the structure of our government officers, where all of us are under one pool of officers like PTD officers, and they can be transferred so that they also gain different experiences in other local councils? If someone is good, perhaps the ministry would want to take him as a senior officer in a ministry. I think this way would be easier for the state government and we can also make good use of the expertise of an officer who serves in that local government. This is a proposal after I observed how local government in the state of Selangor operates. So I really hope that the ministry can look at and study this proposal. Second is the calculation of the door tax. We know that now in Kuala Lumpur there is an uproar because DBKL wants to carry out an annual valuation of all these properties, which has not been done for 21 years, and now everyone in Kuala Lumpur will be in an uproar. The Honourable Minister of Federal Territories is pitied; every day he is asked by reporters, and every day different statements come out. Sometimes they contradict the Mayor of Kuala Lumpur, sometimes other officers speak of other matters, and we are rather confused as to what the next episode will be.
We feel the reason it happened is that DBKL, if it could, would raise the door tax only slightly, just a few percent. However, under the Local Government Act, the door tax calculation rate is indeed fixed and there is no other room for DBKL to make adjustments. So now we see that in some areas the door tax has risen by a few percent, so everyone cries out to the Minister and to our people's representatives. I feel that perhaps the time has come for the ministry to look at the calculation of this door tax. Perhaps we could give the first and second proposals, namely giving room to local government to make justifications or, if they want to raise the door tax, to have other room and methods, not only at the rate or method that is currently enshrined in our law. I ask the ministry to look into this matter. The third issue is in terms of construction projects. Now we have the commercial category, the residential category and the industrial category. In Subang Jaya we are now facing a problem where a hotel wants to be expanded by building several more blocks, but the method is that it wants to sell hotel rooms. Actually it should be allowed. In other countries it is permitted, where the hotel rooms can be sold and we can buy them, and then they are handed back to the hotel management, and we as investors may perhaps at the end of the year gain profits like service apartments. Now the problem with this project is that it is a hotel and wants to expand it, but they applied to the ministry under the service apartment category, so we have a problem. If it is a hotel, we know that not much parking space is needed because the people who come only stay for one or two nights, by taxi or perhaps by tour bus. But if it is turned into service apartments where they are students, doctors or professionals, they like to live where hotel rooms are turned into studio apartments, so there is a problem. Perhaps if they are a married couple, two cars will come in. So the hotel in Subang Jaya is already facing roads that are too congested. When two or three cars enter the car park and there is not enough space, there will be an uproar. Then when residents make noise, the case is now brought to court. Therefore my proposal is that the ministry perhaps should study this: if now we have a trend where hotels can be sold, hotel rooms can also be sold, perhaps we should create a new category for hotels where they can be sold to the public, and car parking for projects like this should be increased further. I ask the ministry to look at this issue because such issues have become a very serious tension in Subang Jaya between residents' associations, the hotel and MPAJ (Ampang Jaya Municipal Council). If we want to avoid such uproar occurring, as long as the ministry amends the existing regulations for these developers, I think if not, cases like this will continue to happen either in Kuala Lumpur or in other places in Selangor, so there will be more uproar in this respect. Thank you.
The Honourable Member for Gerik.
Thank you, Mr Chairman. I would like to discuss P.43 and B.43, namely firstly the Development and Implementation Head under KPKT. Firstly, it concerns the paved roads within the district council areas. I ask that there be no waste, where sometimes we see perhaps surplus money, early in the year the road is paved, and at the end of the year the same road is repaved in the district council areas. However, I thank the government because until today, it can be said that in the areas of Gerik District Council and Pangkalan Hulu District Council, the garden areas and also the areas within the district councils, the allocation for good roads is available, only there are still some gaps that are reduced, I ask that in
under Item 020100 and also Item 00100, allocations be increased for roads in Pangkalan Hulu District Council and also Gerik District Council. Likewise, I feel that in the areas of Gerik District Council and also Pangkalan Hulu District Council, footpaths need to be built, because the secondary and primary schools, whether in the small districts in Gerik District Council or Pangkalan Hulu District Council, are near gardens and also towns. If we build footpaths, it can provide comfort to students who walk home or in areas surrounding schools and also garden areas. The second matter I want to look at is Item 020400 – Urban Wellbeing. I ask that allocations for the Azam Bandar be increased further, where assistance to the hardcore poor residents in the areas of Gerik District Council and Pangkalan Hulu District Council is increased. I prefer to propose that for those who are poor and who have run a business, we give Azam Bandar assistance such as hand-pushed carts or equipment that can transform them from urban poor perhaps into the middle class. At the very least, the first grant we help with should be increased for more people, whether involving all races, Malay, Chinese, Indian, perhaps those living in towns, including Orang Asli and also Siamese.
The next matter I want to look at is housing, Item 01513 and also 040100. I propose that the ministry reviews the state government land that we have reserved as low-cost housing areas. Directly we look at these existing areas and develop them. Otherwise, if they are not developed when we first proposed that low-cost housing be built, because as in my own Parliament, house prices have soared. Even at the border, shophouses at RM400,000, RM500,000 and the lowest residential houses at RM200,000, how can rural residents afford to buy? Eventually, outsiders are the ones who buy these houses. I am of the view that we have several plots reserved for building low-cost houses. I am afraid that, if the federal side does not look for allocations to develop these houses, eventually the state government may privatise the land that has been reserved to other private parties, who will eventually change the title from low-cost housing to middle-cost housing, medium-cost housing or even higher-cost housing. Because sometimes those who obtain these projects think more about profit and not about the good of the people, especially in rural areas. At the same time I would also like to refer to P.43 Item 31000 and also 050200. I thank the ministry because it has established JKKK in the Kampung Baru Cina area, which has long had a village head and a JKKK. Meanwhile, in new housing estate areas it is understood that there will be JKKKP, which can help us with management at the level of the many gardens that are being developed. What is important for the JKKK is that I am confident the federal side has recognised them with official stamps replacing the village head. However, JKKKP, the Residents' Security Committee, is a new thing. Therefore it is hoped that the ministry must give recognition to garden chairmen so that they have a stamp, and the stamp can be accepted by schools and anyone else for confirmation to them representing the residents of the gardens concerned. Other matters, I am sure this time the residents' committee has allowances for the Chairman and the committee, and I am confident the ministry will also provide management assistance for residents' associations, to ensure alignment with villages, in rural areas, in villages where we have village heads, in garden areas where we have garden chairmen who have the status of village heads. My hope is that this matter can help planning and also all
...that we want to do for the Ministry of Housing and also other matters under the management of the Federal Government. At the same time I also want to discuss the item 060100 on National Landscape. The only thing is that we see the government spending a great deal, not only in my parliamentary constituency but throughout the country, on landscaping in the areas of the district councils, municipal councils and city halls. What seems rather strange is that sometimes, in less than a year, the trees that were planted are replaced again and dug up. We plant the red coconut palms carefully, and when we look the following year, they plant other trees. In the end we see the government wasting money. So this is what the ministry, together with the state government authorities, must look at, so that money is not wasted, but what matters is that we want to see beautiful landscaping in the areas of the district councils, municipal councils and city halls. I am confident that if we jointly monitor this matter, the large amount of money just now, we can help for other things, for other development. Roads may be even better, bridges. In fact, in the areas of these district councils there are various problems that arise. Today we see why the people within the areas of the district councils, municipal councils and city halls oppose the Barisan Nasional Government. This means that this is where we must look at the key, that if we can resolve not 100%, but at least 60% or 70% in all three of the district councils, municipal councils and city halls, I am confident that for the fourteenth PRU, the residents just now may shift to support the Barisan Nasional Government. Next, I also want to discuss, namely regarding item 00100 and item 070200, which is Town and Country Planning. I would like to ask the ministry: when we have proposed an area and the town planners have agreed to make a plan, suddenly at the district level a different plan is made for the area that was already agreed. Is there not an Act or a law that says if we declare an area to be an industrial area, then in that area we must develop industry. If we say that area is to be developed for housing, then we develop housing. If we say we want to make that area an agricultural area, we develop agriculture. I do not know much about the law in this respect, so I ask for an explanation from the ministry through the town and country planners, and we hope for one more thing: that the ministry will help, in that when we invite the town planners at district level to discuss planning for new areas, they give their cooperation to ensure that planning is according to what we want.
Yes, Honourable Gerik.
Ya?
Ya.
Meanwhile, I also want to discuss item 08000 together with P.43 item 01513, namely the fire station in Gerik town. Today the fire station in Gerik town is somewhat in the middle of the town, small, and causes congestion within Bandar Gerik itself. I share with the Lenggong section in the Lenggong Parliament, where in fact there is a piece of land at Padang Kunyit, almost, if I am not mistaken, 20 acres or 10 acres. In fact, this land was acquired when I was studying in Form Two in 1971. Several times the government promised to build a new fire station, until I became a Member of Parliament, and still I do not see any development of a fire station. Allegedly five years ago it was said there was an allocation, but it was taken away to Taiping. I hope this time, as just now Honourable Lenggong also requested, I also request. At the time of that acquisition, I was teaching the Member of Parliament for Lenggong. What form was he in then, right? He still does not know, until our hair turns from black to white, I wonder if a new fire station that does not cause congestion will ever exist in the
middle of Bandar Gerik. So that is among what I wish to speak on. Hereby Honourable Gerik supports the allocation under the Ministry of Local Government.
Honourable Sungai Siput.
Thank you, Mr Chairman. I have several points. First, under item 010200 regarding low-cost flats. At present, the management of low-cost flats is still unsatisfactory. Now there are many problems faced by the committees in collecting money. Because the money collected is not very large, perhaps RM30 a month, it is difficult for them to go to court to force those who do not pay. That would incur a much higher cost. When a minority do not pay and are left alone, others see why he does not pay, why should I pay? He also stops. Many of these low-cost flats have the problem that they do not get money, they cannot manage the management, and these flats become like, with permission, urban slums.
It is dirty and not painted, corridor lights do not function and the lifts are not repaired. A big problem. So I would like to suggest to the Ministry of Housing and Local Government that the method used in Singapore, where local authorities are given the responsibility of maintenance, may perhaps be adopted for our flats where the units are valued at RM100,000 and below. For high-cost flats, namely apartments, we can let them maintain as now, but for low-cost ones we must make an approach where these are maintained by the local authority there. When one local authority looks after 10 to 15, it also has economy of scale, because one accountant and one office can look after all fifteen. So I hope this will be studied, and perhaps we can also make room to set up a residents' committee. So they are given the opportunity to give feedback. Could have the feedback system? So I think this should be studied, because now in the big cities we have many low-cost flats that have become urban slums, and this brings social problems to us. Second is item 010500 – Law. Here I want to touch on one issue of the poor group in our cities. They have built their houses, but the land is not their own. It is private land, private land. In English they are called, with permission, ground tenants, tenants of land. Own house but rented land. So usually what happens when development reaches there, the land is bought by a developer and he chases these people away even though they have been there for 30 or 50 years, they must be evicted. There are many like this in Sungai Siput and in Ipoh. Ground tenants are many, and then, up to now there is absolutely no protection under the law. When someone buys that land, he gets the full right. Even though the ground tenants have been there for 30 or 40 years, they are simply evicted. So I want to request that under the law under this section, a review of the National Land Code be made, and to see whether we can include conditions that can protect the situation of ground tenants, namely these land tenants, when their land is bought by another party and developed. I also want the Ministry of Housing and Local Government to study whether we can take over? Can local government, as in Sungai Siput, have a village, namely Kampung Kapor in Karai? Where there are 150 families, all of whom are ground tenants. There are four blocks of land owned by private parties, and these families have all built their houses. Can the government allocate a fund to help the state government take over this land, or acquisition of this land, and sell it. Collect RM150 from the residents there, collect premiums from them, and pay the five owners of the land. So we will keep them on that land, give them titles there, because the Minister himself said we have RM1.7 million people without houses. If people like this we also make homeless, we must also find houses for them.
So I think can we keep them there by using an allocation, collect from them, pay back to the landowners, and keep them as a heritage village. I hope if this can be tried in Sungai Siput, very welcome, because this is a beautiful village there. The third issue I want to raise is under item 040000 – National Housing. In the budget presentation, the Prime Minister mentioned the My Home Scheme, where a, with permission, Private Affordable Ownership Scheme, where a subsidy of RM30,000 will be given to private parties to build each housing unit there, and these houses must be sold at an affordable price of RM45,000 and above, and 10,000 units are proposed for next year. In Sungai Siput, I am compiling a list of people who do not have houses. These are squatters. We call them urban settlers. People like this are ground tenants, yes, tenants of land. People who rent houses in housing estates and people who have bought houses but have lost the house. It was repossessed and auctioned by the bank. There are more than 200 families who need houses. So I request, if these 10,000 proposed, can 200 houses be built in Sungai Siput? There is a lot of government land, there are acres of government land that can be used. Can we do a pilot project there to build houses, but I request that we must sell these houses only to those who do not have houses. They cannot be speculated on. We must make a list, see who really does not have a house, and sell to them at a lower price. The fourth issue I want to raise is under item 070000 under Town and Country Planning. The issue of flash floods, yes. This incident is happening more frequently and more seriously in our cities, and it is closely related to our pattern of development. Forest areas or agricultural areas can hold much more rainwater. When rain falls on a forest area or in an estate, the amount of water entering the drains and flowing to the rivers in the first six hours is much less. It may be only 25%, because the rainwater will seep into the soil and be stored in lakes, ponds and swamp land. However, when development takes place, all the land is cemented. All the ponds are filled. So the ratio of water falling on land that enters drains and rivers becomes 80% or 90%. That is the cause of flash floods. I know the Ministry of Housing and Local Government has issued a paper stating how housing estates must provide playing fields, for example, that can hold water during rain. They must maintain pond areas. But does this happen? Is anyone monitoring every area? Are the steps recommended by the ministry followed? So I hope this ministry can do spot checks in several urban areas to see whether developers comply with these steps? If not, we will be flooded. Last, I want to bring this to local government, yes, item 050100. I want to ask the ministry to review our method of privatising local government duties to contractors. As in Sungai Siput, yes, we have privatised rubbish collection, drain cleaning and grass cutting, all privatised. The reason given is that it is more efficient and will reduce costs for the government. However, based on my experience in Sungai Siput, the housing estates do not do it. For a year they do not clean the drains. We have to phone and complain before the drains are cleaned. So this is an issue that I think we must review. Is this truly a way to save costs for the government, or has it become a way to make profit for a few contractors who are close to the local government authorities? So I hope this will be studied. Last, there is the issue of local government elections, because if we have local government elections, the local authority will be much more responsive to the residents there, and if the government does not want to make it 100% elected, perhaps out of the 24 seats we can open 16 seats for election. Only eight others we can appoint. So we still have control. We can include professional people. So I hope this will be studied. Thank you.
Yes, Honourable Labuan.
Thank you, Mr Chairman. Labuan has just a little for item 0151301600 – People's Owned Housing Programme and People's Rental Housing Programme.
In Labuan, although it is developing rapidly, in fact the demand, with permission, for affordable housing is indeed very high. Recently it was announced that affordable housing will be allocated more than RM10 thousand for Labuan. Of this RM10 thousand, in fact, more than half is for the category needed, namely people's rental housing and cheap people's housing, although perhaps some of it is affordable housing below RM250,000. So, considering that Labuan lacks land and its land is expensive, I would like to request the ministry to provide an adequate budget for the purpose of purchasing land for both the people's owned housing programme and this people's rental housing programme. In Labuan, in fact, we also have four water villages with dense populations and also several squatter areas. In these water village areas, this may also be due to the culture that has existed until now, where one house is occupied by three or more families. Perhaps in the olden days it could be tolerated, with permission, by the occupants or families and children. However, at present, with the demand, with permission, higher living standards and it has become something burdensome. Where I myself, as a people's representative, have repeatedly received visits and requests from several families living in one house who have had to move immediately because of fights that could no longer be controlled. They come very emotionally, and this case is in fact not an isolated case, but it seems like a phenomenon that really needs to be addressed. So I think the same thing also happens in the water house areas in Sabah. I think, the Honourable Minister would not find it difficult to understand. So, the need for people's rental housing is indeed very important so that we can move families with these problems to these people's houses. At the same time, Labuan also needs more systematic solid waste management. So, it is hoped that an adequate budget will also be allocated. It has indeed already been under discussion all this time to privatise solid waste management in Labuan. It is hoped it can be implemented in 2014 this year. Apart from that, I just want to express thanks to the ministry that has approved the construction of a fire station which is long overdue in Labuan, a related fire station, which is better prepared to deal with chemical or oil and gas fires. I hope a budget will also be allocated for training because it is a new mechanism for them to implement this fire fighting programme. If possible, since Labuan has the environment or oil and gas industry already in place, it can also be used as a training ground for fire programmes for that industry. Since many of these industries are developing in other areas around Labuan such as Sipitang and Kimanis, this will to some extent contribute to Labuan's economy. Likewise with other programmes that have been implemented in Labuan, although the local government in Labuan is not under KPKT, KPKT has also implemented various programmes including rat eradication and so on. Thank you. Accordingly, Honourable Labuan begs to support.
Yes, Honourable Bukit Gantang.
Assalamualaikum warahmatullahi taala wabarakatuh dan salam sejahtera. Thank you, Mr Chairman. I will debate B.43 Item 100100, namely the Institute of Housing and Local Government Training (ILPKT). I hope this institute will be made a centre for training members of Local Government Councils, especially so that their quality as members can be improved. For those already in place, they should be upgraded in terms of knowledge and also in terms of their capability as members of Local Government Councils, which we regard as an important institution in a government that practises the democratic system. Thus, we hope that the members of these Councils will not be people who are merely ignorant of their function as a check and balance in a state government, particularly in the administration under local government. Above all, we want Council members to protect the rights of, and voice the concerns of, the taxpayers who fall under the administration of this local government. That is one. Second, concerning B.43 Item 080500 on Fire Safety. So, when the tragedy occurred on 31 October, namely six flat units in Kampung Kerinchi that were burned, that was all a matter of fate, but we hope that among the things that should happen is that - indeed, the fire that broke out in that area did face difficulties, even though there were already 11 members among the fire engine crews to put out the fire on the 17th floor of the Kampung Kerinchi flats. In my view, the ministry needs to increase these, because if I am not mistaken there are four, according to the record I saw on the portal, while the fire brigade has 14, namely the Air Unit based in Subang. My only question is, is that unit only for fires that occur on aircraft, or also for houses, such as the flats and condominiums found around the city in particular, and also in other places with high-rise flats in big cities, which cannot be reached by the fire engine's ordinary ladder?
This needs to be considered so that the fire brigade has trained firefighting teams to deal with fires in skyscrapers here. Likewise, we hope that in the context of today, with regard to training for fire brigade personnel, especially in handling cases arising from radioactive material, biological agents, chemicals and explosive materials, the extent to which they need to be given training from time to time, because the causes of fire today do not only come from ordinary fire, so training is needed, and the improvement of this must be present among fire brigade personnel. I once saw with my own eyes, in what happened in my Parliamentary area, at that time we saw, God knows best, perhaps because it had not been used for a long time, whether this fire equipment, or that equipment had broken, I am not sure. How many times was it switched on, and then the pipe outlet opened, then opened again. So I feel that what I hope for is that this is something that must not happen in other places, because we are worried that this will cost lives and property. Finally, I want to ask the Honourable Minister about what indicators or yardsticks are used to decide where to place a fire station? Considering that in my Parliamentary area, when it is close to the Trong State Assembly area, it is quite far. If there, they only rely on the Taiping Fire Station and the fire stations around Manjong, in the Manjong district over there. That is why I hope that, if possible, the Honourable Minister can look at and survey the placement of a small fire station near Trong to cover the Trong district and also near Batu 9 and Batu 8 in the Bukit Gantang Parliamentary district. That is all, thank you.
Yes, the Honourable Member for Kuala Kangsar.
Thank you, Mr Chairman. I would like to ask about Item 070000 – 070300 relating to Town Planning. Mr Chairman, if we look at developing a project, whether housing or projects related to tourism, we see that many new methods need to be considered. I request the ministry to review the planning guidelines and also the building guidelines, namely the Uniform Building By-Laws, because if we look back, we see that some of those matters are indeed no longer practical. For example, if we look at the row of housing construction, such as terrace houses, there is a requirement to provide a setback of 10 feet to 15 feet depending on the local government. Actually, this area is no longer a necessary area, because basically in the past it was as if this was to give access to the fire brigade in case of fire or emergency. So, if we abolish examples like this, perhaps we can get more housing density within one acre. If we look at the back lane or the rear pathways, in fact they have become a dumping ground for rubbish, a place where people store old items, and also an access route for trespassers. So I feel that simply providing drainage and a rear boundary facing the neighbour is sufficient. Furthermore, removing or eliminating what happens in the back lane should no longer be a problem for housing schemes. Likewise with guidance on setbacks for plans and planning proposals for developing tourism buildings, for example. We want to build houses right up to- above the water, on the beach fringe, on the water's edge or on the banks of rivers, seas and lakes. Because of constraints and planning that require a setback of many chains, hundreds of feet, this matter needs to be reviewed so that there is flexibility for us to apply for permission in our planning, so that things that have been practised in other countries can be implemented for planning or development like this. Thus there has been development at the edge, on the lake shore, at the riverside, and even on the sea. This has also been implemented by two or three local government areas. Because of pressure or political will, this has happened, and I hope this matter can be seen as comprehensive, with coordination, uniformity and flexibility in our undertaking of matters that can develop and also shape tourism and such buildings so that they can be implemented in our country. The role of the ministry to cooperate with the local authorities that approve these development projects needs to be looked at, and it should go hand in hand with the ministry so that these matters can be carried out and we can implement the projects I mentioned earlier. That is all, thank you.
The Honourable Member for Serdang.
Thank you, Mr Chairman. I would like to refer to B.43 Item 090000 – National Solid Waste Management, or National Solid Waste Management, with permission, under management expenditure. The amount allocated is RM497.5 million for the year 2014. The amount to handle this solid waste is very large and will increase every year, because the rate of solid waste generation in Malaysia is rising. In 2012, the solid waste that had to be managed was approximately 33,000 tonnes every day. In 2005, it was only 19 tonnes every day. Unfortunately, at the same time, the ministry has failed to
carry out the task of increasing the recycling rate to a satisfactory level, with permission. Our country's recycling rate was only 5% in 2005 and rose to 9.7% in 2012. If we want to make a comparison, the recycling rate in our neighbouring country, Singapore, has exceeded 50% at present. In some places in developed countries such as San Francisco, the recycling rate has reached 75%. I would like to get an explanation from the Honourable Minister: what is the reason for the failure to raise our recycling rate to the level of developed countries? I would also like the Honourable Minister to tell this honourable House: what is the general plan to increase our country's recycling rate and what target is to be achieved? At the same time, I would also like to ask the Honourable Minister whether this zero waste policy, with permission, is a target to be achieved by the ministry, especially in urban areas, where economy of scale to reduce solid waste to zero is easier to achieve, as is being planned by cities in developed countries such as San Francisco. At the same time, I would also like to ask, what is the use of the allocation given for the public awareness campaign for Solid Waste Management under Item 140700? Is this allocation used to raise public awareness of recycling, or will this allocation be used for propaganda to build an incinerator in Taman Beringin, Kepong? One of the consequences of the government's failure to increase our country's recycling rate is the pressure to build more landfills to dispose of rubbish. Furthermore, the ministry has once again planned to build an incinerator plant beside the transfer station site in Taman Beringin, Kepong. I would like to remind this honourable House that in 2003 the government proposed to build an incinerator plant in Broga, Semenyih. However, this plan was cancelled in 2006 due to strong objections from the residents there.
At the same time, compensation was also paid to the Japanese company Ibara Corp., which was initially given the contract to build an incinerator in Broga, Semenyih. I would like to ask the Honourable Minister for an explanation as to whether the proposal to build an incinerator plant in Taman Beringin complies with the conditions set by the Department of Town and Country Planning, which require that the location of a large-scale incinerator site be built at the boundary of a development area or outside a development, with a minimum distance from the development focus area of at least a 50 kilometre radius. Taman Beringin in Kepong is indeed a place with a dense population. So, why is an incinerator plant still being proposed there? The Honourable Minister announced in Parliament on 12 November 2013 that an open tender would be carried out in December and would be open to all technologies and not only incinerators. I would like the Honourable Minister to confirm that the incinerator is only one of the options for addressing the solid waste problem in our country, and particularly in Taman Beringin in Kepong. At a briefing given by the Director of the Solid Waste Management Department, Dr. Nadzri Yahaya, to the residents of Taman Beringin in Kepong, he gave an assurance that all tenders or bids received by the ministry for the Taman Beringin area would be published openly to all members of the public to evaluate and study. I want a guarantee from the Honourable Minister that what was promised by Dr. Nadzri Yahaya will also be implemented by the ministry, namely to make public, with permission, all the tenders for all the technologies proposed or bid for by certain companies in Taman Beringin, Kepong. I hope the Honourable Minister can answer my questions. Thank you.
Yes, the Honourable Member for Jerantut.
Thank you, Mr Chairman. Firstly, I would like to congratulate the ministry for bringing many changes to this ministry, especially in sustaining the needs of the people. However, I would like to touch on several matters under this ministry. Firstly, regarding the matters under Head 010200 concerning scrutiny of housing areas that do not comply with the directives that have been determined. For example, the provision of adequate open space, additional requirements such as playing fields, and for some areas where the housing is adjacent. New areas adjacent to existing areas, sometimes developers share existing roads. So, with more detailed supervision carried out by the local authorities, it will be able to guarantee that the requirements that should be provided are fulfilled. The second matter is about Head 040100 – National Housing. I hope this provision can be extended to areas in the town of Jerantut in particular, because the price of houses in the town of Jerantut is now rising so sharply, including shophouses, to the point that the price of some shophouses approaches the price of shophouses in big cities. This includes houses that may not be affordable to buyers with low incomes in the town of Jerantut. With the existence of government housing projects in this town, to some extent it will be able to control the price increases currently taking place. Mr Chairman, the second matter is that I would like to touch on Head 080300 – The need for a fairly reasonable fire station in Jerantut, because it suits the very rapid development of the town. So the condition of the fire station that exists in Jerantut now is very deserving of new development together with facilities that suit those needs. This is because, for the information of the Honourable Minister, the Jerantut Fire Station also covers the needs of the town of Kuala Krau, which is in your own area, Mr Chairman. The distance is approximately 30 kilometres. So, with standard, uniform and adequate needs for the Jerantut Fire Station, certainly the measures to overcome or save property and lives when a fire occurs can be addressed better and faster. Next, I would like to touch on urban wellbeing, namely items 141100 and 141300 concerning NRKA, 1AZAM Bandar and the Kios Programme. I hope this provision can also be expanded to Jerantut, as the town of Jerantut also has residents or communities with low incomes, and with this programme brought to Jerantut, God willing, it can overcome urban poverty in the town of Jerantut. So Mr Chairman, that is all from the Parliament of Jerantut. I request to support.
Yes, the Honourable Member for Bayan Baru. Are there many more? One, two, three, four, five and six. Each one may have five minutes, yes.
Thank you, Mr Chairman. I would like to thank the Honourable Minister and the Honourable Deputy Minister for being willing to sit here to listen to the debate, and this is a good example. I would like to begin with B.43 Head 040100 – National Housing. We know that until now the Ministry of Urban Wellbeing, Housing and Local Government has been the leader in building low-cost houses and also PPR flats in areas. However, its task has now been taken over by PR1MA, a body under the Prime Minister's Department (JPM). That is why I feel that it is
Something is not right. Although this is partly about policy, I feel the Minister of Urban Wellbeing, Housing and Local Government should be brought into the Cabinet and try to get back from PR1MA, because we do not want many committees. It confuses the people. I want to tell you that now, with the existence of PR1MA, people have to register with PR1MA to buy PR1MA houses. Basically, the Ministry of Urban Wellbeing, Housing and Local Government (KPKT), under the Housing Department, already has a list of people who need housing. There is already one list. Previously, with PPR, state governments or local authorities already had registration, a list of residents who need housing. Now there is PR1MA, and people who registered earlier with the Housing Department can now get houses. So it is confusing. There are many lists. Many people have to register two or three times, and some who registered long ago did not get a house while those who had just registered did. So I feel that, if possible, the Minister of Urban Wellbeing, Housing and Local Government should try to discuss with the Cabinet so that PR1MA is placed under the Ministry of Urban Wellbeing, Housing and Local Government.
The second issue is PP1M, which is a very good programme. If we look everywhere in urban areas such as Pulau Pinang, Kuala Lumpur, Selangor and so on, many low-cost houses, PPR flats or medium-cost houses are now in a dilapidated state. As the Honourable Member for Sungai Siput said, there is urban slump in many places because people cannot afford maintenance costs. When their paint has faded, when their water tanks have leaked, they do not have enough maintenance money to repair them, even though we have introduced maintenance costs. But the general character of Malaysians, which sometimes I also feel is inadequate, is that they are willing to pay for ASTRO and are willing to pay for all sorts of things, but they are not willing to pay RM35 or RM45 in maintenance costs.
However, this is the reality on the ground, where many people are unwilling to pay maintenance costs, and in the end, when something big happens or a tank rusts or leaks, they cannot pay and have to look for a Member of Parliament to help them. With the existence of TP1M, I feel TP1M can help. However, I noticed that earlier the KPKT announced that there was RM500 million for TP1M. But when I asked the Honourable Minister recently, on 24 September 2013, the Honourable Minister replied that up to 31 August 2013, the estimated TP1M allocation was RM40 million. I noticed that there are 13 projects in Johor, 8 projects in Melaka, 13 projects in Perak, 4 projects in Pulau Pinang, 1 project in Kedah, and 64 projects in the Federal Territory of Kuala Lumpur. The total estimated cost allocation is RM40 million. When we asked the Minister, the Minister said the allocation had been exhausted for 2013. So this is a doubt. Where is the RM500 million that was promised? Why only RM40 million? I want to inform the Minister that in Pulau Pinang we have 114 projects. In the Bayan Baru area alone, 18 projects were submitted. Among the 114 projects in Pulau Pinang and across Malaysia, I think there may be 1,000 projects. Why stop at only RM40 million? Why not use the RM500 million allocation? The people are in a very difficult situation now. Flats, and I think people are willing to pay 30% or 10% of the amount from GMB. No problem. But I ask the Honourable Minister for an explanation: what are the criteria? This is because when I asked about the criteria, the Honourable Minister answered, saying the housing must have been occupied for more than 10 years, GMB has sufficient funds, the damage to the building is to shared property, and it endangers the safety and comfort of the occupants. This is a generated answer. When 114 projects from Pulau Pinang and 18 projects from Bayan Baru are sent to KPKT, who gets them and who does not? Who is the priority? Is it first come, first served, or is it based on looking at the
circumstances? I do not really understand and I feel doubtful and suspicious. Why did the Federal Territory get 64 projects? Why did Kedah get one project and why did Pulau Pinang get only four projects? In fact, Pulau Pinang has a great many strata low-cost buildings or low-cost houses. So I ask the Honourable Minister, if possible, not to sideline or step-motherly treat Pulau Pinang, especially Bayan Baru. Because we are trying to help the Minister too. KOMTAR also wants, if possible, that the Honourable Member spend the RM500 million that is already in the fund. Use it for the sake of the people. Another issue concerns JPP, or the Residents' Representative Committee. When the Honourable Minister answered me at the policy level, the Minister did not deny that this JPP is in the form of counsellors who try to act as intermediaries to obtain views from the people to be channelled to ministry officers. They will be appointed. So all the features that the Minister has stated are indeed like Federal Counsellors, very much like a Federal Councillor. So I do not dispute it, but I feel that when the Minister responded to reporters, saying this new initiative is the result of feedback during the last GE13, which showed that most urban residents do not clearly understand the government's programmes and policies. I feel the problem with this JPP is that we have too many committees. Usually, when there is a problem, okay, set up a committee. An allocation of RM63 million, a very large amount of money. A redundancy. If we already have Councillors, let the power be given to the Councillors. Let them do the work.
The Honourable Member for Bayan Baru.
Give them the allocation if they do not do the work, but give them a bigger allocation so they can carry out the work well. Now, if we hold meetings, I want to say, there are usually many meetings. Every day the Honourable Minister has to attend meetings. So when we are Members of Parliament, Councillors and Ministers, all our time is spent only on meetings. However, if we reduce unnecessary committees, we can have more time to focus on solving problems, problem solving that requires instructions from Members of Parliament. It requires instructions from Councillors. Solve problems on the ground, fewer meetings. So this is, in my view, something that is really not needed. If possible, we want the Ministry of Urban Wellbeing, Housing and Local Government to be more effective. We should have local government elections. That is the ultimate. If Councillors are elected by the people, they will work hard because they want to win in the next election. They can have authority because they are elected by the people. So if we always appoint people, then appoint them, okay, JPP will later appoint UMNO divisional committee members, MCA divisional committee members. Those are just political appointees. At the end of the day, they are beholden to the political master, not beholden to the people. So the issue now is to return the power to the people. Give power to the people. Choose the Councillors.
Ya, cukuplah.
So this will make the government effective. Then the people will support Barisan Nasional again if local government holds local government elections. Finally, Mr Chairman, I want to raise the issue of the new Strata Act. This is the voice of the COB officers. They feel the problem of seizure. There is a provision to seize people who do not pay maintenance fees under the new Strata Title Act. However, the guidelines have not yet been set by KPKT to create a procedure, an SOP, on how they can seize houses whose owners do not pay maintenance fees.
The Honourable Member for Bayan Baru, that's enough.
Last, last. Just one minute. The last item is Item 090100 – National Solid Waste Management. On the recycling rate just now, I support the Honourable Member for Serdang that the recycling rate is far too low. I want to tell you now that the Honourable Member for Serdang earlier mentioned San Fransisco.
I lived in San Fransisco for six years. So I want to tell you how the people of San Fransisco do recycling. Every week they are provided with four bins. One bin for newspaper and paper, one bin for bottles and cans, the third bin for garbage, and the fourth bin for yard waste. So every week they send different recyclables to collect all four bins. So every Monday you just put your bin out at the roadside. They will collect all four bins.
Honourable Member, you have been speaking for a very long time, Honourable Member.
Yes, okay. So this is something that has succeeded. I think, and I want to propose to KPKT, if possible, to implement recycling because it is very important. If we can reduce and increase the recycling rate, then solid waste will be reduced. With those words, thank you very much.
The Honourable Member for Pasir Gudang
Thank you, Mr Chairman. I would like to touch on Item 020000 – Policy and Development and sub-heading 024400 – Urban Wellbeing. I take this opportunity to request the ministry's kind assistance to review the role of this JMB under urban wellbeing, because wherever there is a JMB, its role can be concluded as a failure, because residents do not pay what they should pay, causing the area to eventually become dirty and neglected. So it would be better if this problem were returned to the municipal councils with certain methods so that the areas will appear clean and well maintained. Under Item 050000 – Local Government and sub-item 050200 – Village Development. There are still many villages in my area. From Pasir Gudang, we have about 11 more villages which we certainly wish to preserve, because we do not want that one day, perhaps 10 years from now, when our children grow up, they will not know what a village atmosphere is like. So with the remaining villages that exist, we hope the ministry can cooperate to find the best way, together with the state government, so that these villages can be preserved, and the facilities within these villages are expedited in construction, whether in terms of roads, drainage and also basic facilities. Many villages are still experiencing this internet disruption problem. Under Item 070000 – Town and Village Planning, 070200 – Development Plans. We hope that with the plans made, whenever a new housing estate is built, the local government will take the initiative. I often hear that the usual answer given is that it is the responsibility of the state government, but as the local government, we should be able to give directions to the councils when a development is carried out. For example, if there is a very large housing estate, one to be built with hundreds or thousands of houses. So please follow the examples of foreign countries.
Make sure the developer provides basic facilities so that those facilities do not revert to the government. Among them are facilities such as suraus, their own mosques, and also schools, which are very important. If we follow Thailand, when an area is developed, the developer is even required to build hospitals, but their prices are not skyrocketing. In my area, people in the industry have said this before, but houses have now reached nearly RM1 million. Who is going to buy them? The land is Malaysian land, but those who come to live there are Singaporeans in large numbers. Is this fair to our own citizens? Next, under Item 080000 – Fire and Rescue Department of Malaysia (Bomba), sub-item 080200 – Training. We know that the problem of fires is a disaster; we do not know when it will happen. So I would like to propose that the ministry, with the establishment of a Residents' Committee, and now what is called JPP, create a volunteer force to prevent or fight fires, and that courses be given to this committee, to those who are interested, so that if the Bomba is late, they can do something. But it must be remembered that when these volunteer firefighters are established, the ministry must also look at the insurance problem. If there is no insurance, if an accident occurs, it will fall back on their families. Under the heading 110000 – Solid Waste and Public Cleansing Management Corporation (PPSPPA), 110100. Many people are quite dissatisfied with the monopoly carried out by SWM. Its service is very poor. Rubbish is not collected as frequently in the area where I lived before, even though they still use the same contractor, but there is no direct monitoring under the council. Previously, rubbish was collected almost every day. In certain areas now, it is collected once a week, sometimes twice if you are lucky. This has become a complaint among local residents. Under Item 130000 – New Policy, 130800 – Annual Salary Increment. I would like to propose that the ministry give appropriate increments to our fire officers, because I hear many complaints about their duties being quite dangerous, but the salaries they receive are not commensurate with the work they carry out. Finally, I would like to propose under 01513 – Owned People's Housing Programme. I request that the People's Housing Programme be built in my area so that we can help them with incomes below RM3,000, because of the excessively high house prices in the Parliament of Pasir Gudang. That is all I wish to convey. Please give it due attention, and I, Pasir Gudang, support it. Thank you.
The Honourable Member for Petaling Jaya Selatan.
Thank you, Mr Chairman. I would like to refer to 020000 – Policy and Development. Here I want to raise the concept of build-then-sell, which I had already brought up during my first term. At that time, it was a different minister, not the Honourable Member for Kota Belud from MCA, who had made a promise. He said this policy would be introduced, and he gave a time frame. If I am not mistaken, by 2015 it would achieve at least 30% of this concept. The current sell-then-build concept has indeed caused problems because we are experiencing many problems of abandoned houses and projects that developers have failed to complete.
So, I have already raised this concept in Parliament, where we are not saying that 100% of the costs must be borne by developers. No. The government needs to consider carefully, introducing this concept, namely build first, then sell, where we collect 10% on a 10:90 ratio, so as to encourage developers to build first, to prevent abandoned projects, and to prevent these developers from running away or going bankrupt. This is what has been introduced in many countries such as Thailand, New Zealand and Australia; many countries have already introduced this concept.
But Malaysia is still using the problem we have now, which is the concept of selling first and collecting money before building. Many projects that were built only halfway, where the developer went bankrupt, could not be carried out. So, I want to know from the Honourable Minister to give a time frame. Don't just say it is a problem and that developers do not cooperate, while we do not give any incentives at all. In terms of taxes, we do not give any. I think the ministry needs to look at this matter seriously. In introducing this concept, we could selectively choose some developers to carry it out so that we can implement it as quickly as possible. I want to know about this concept. At present, in 2013, how many developers in Malaysia have implemented the build-then-sell concept? What percentage? If we say we want to reach 30% by 2015, I do not think that is possible. If we do not implement it now, we will not be able to reach this level. So, I also want to know, because of this sell-then-build concept, many abandoned houses have appeared in Malaysia. There are still many abandoned houses and abandoned projects that cannot be completed or carried on. In my constituency, there are two abandoned projects. They have not been completed for more than 10 years. We wait and wait, and until now they have not moved again. First, at PJS 1 in Taman Petaling Utama, Block E. This project began in 2003; now it is 2013. That is 10 years already. Problems still arise because the buyers still have to pay bank interest. They do not get their houses; these are low-cost houses. It seems the developer has no interest in implementing and continuing this project. Block E, Taman Petaling Utama PJS1. Second, Villaria Apartment at PJS 5, next to my constituency. It is under Kelana Jaya but beside PJS 2. If I am not mistaken, it has been 15 years and this apartment project is still there but not completed. It is about 70% complete. So, I want to ask, does this ministry intend to, and when will it carry out and restore these two abandoned projects in my constituency? I want to refer to the second matter, namely Item 080000 – Fire and Rescue Department of Malaysia. I have indeed praised the Jalan Penchala, PJ fire station because they are so quick and so efficient in saving property and lives during fires. I do praise them, but they face a very big problem in my constituency. When they arrive at the scene, the water pressure at the fire hydrant is very poor, there is no water. Imagine them trying to put out a fire using water from the drain. So, the fire hydrants are not being maintained. I have already raised this earlier at Taman Dato' Harun. That is one area, but there is also PJ Old Town Seksyen 1 and Seksyen 2, where fires have occurred twice. There was no water. They face water problems. The fire hydrants are not maintained. So, I hope KPKT can carry out this work to ensure that the existing fire hydrants are regulated and well looked after. Ensure adequate water pressure so that if a fire breaks out, we can put it out as effectively as possible. I also want to raise the third matter, namely Item 01604 – Repair and Maintenance. The maintenance problem in low-cost apartments and flats. In my constituency, especially in Taman Medan, many low-cost apartments face problems where many residents do not pay maintenance and many houses are rented out to foreigners. They do not live there, so the foreigners do not pay maintenance, and there is the problem where lifts are not serviced or maintained, and there are lift breakdowns in many low-cost apartments, as well as problems with broken sewage systems, rubbish not collected, insufficient parking spaces, and also the problem of them renting to foreigners that I raised just now. I want to ask the Honourable Minister about the matter of maintenance. Maintenance was mentioned earlier by the Honourable Member for Bayan Baru, that in these low-cost apartments we really cannot count on the JMB. The JMB members have no experience; they only focus on their daily work every day. They are among the low-income group. Do not expect them to be able to organise the JMB properly. No. They have no experience at all. They carry out this JMB work on a voluntary basis. If they
are low-income, with income not exceeding RM1,500, imagine how they are supposed to collect maintenance. So, there is a law that allows these cases to be brought to court, but court cases are a very slow process. The COB also does not function. The COB has no experience at all in carrying out the work. In MPPJ especially, the COB is not located at MPPJ. Its office is rented in another building. The COB officer in charge has no experience at all.
Honourable Member, you may finish, finish.
How can we help residents who live in these low-cost flats? So, I want to ask, I think it is time for the government to amend the law and ensure that residents who live in these low-cost flats really do pay maintenance so that lift maintenance can be carried out. Otherwise, every time a lift breaks down, it becomes the responsibility of the state government, the local government, and also the Federal Government, which must allocate funds to repair these broken lifts. So, I think that is all. Thank you.
Honourable Member, I propose that the debate be closed at 9 o'clock and that the Honourable Minister be given one and a half hours to reply.
Ten minutes is not enough.
For those who do not get the chance to speak, I am sorry, Honourable Member. Honourable Member for Sik.
Thank you, Mr Chairman. I want to touch on Item B.43 080400 – Fire Operations and Rescue, Item B.43 31000 – Procurement of Vehicles, Helicopters and Fire Equipment. Do not include helicopters. In my constituency, there is one fire station with one large fire engine, a Scania type. If we look at Sik Parliament, there are indeed some large roads, but there are more village areas consisting of mini tar roads and small bridges.
Many fires occur, but the fire sites are deep inside, and the large Scania vehicle cannot reach the accident site. This causes the fires to be unable to be saved. Therefore, I suggest to the ministry and to the Minister to provide smaller vehicles, such as pickups fully equipped with fire-fighting equipment. This is so that they can reach the fire sites and the fires can be saved. Mr Chairman, I think that is all from me.
Honourable Member for Mersing, you may continue.
Honourable Member for Mersing again.
No, you only have two minutes, Honourable Member.
One minute only. Mr Chairman, thank you for this injury time, but there is still time for nasi Arab. This is Item 050000 – Local Government. I want to say a little about the mamak shops, Mr Chairman. We want to become a developed country, but these mamak shops are open 24 hours, there is no control, and they have mushroomed. So the issue is that there is no developed country or neighbouring country in ASEAN that has
food outlets open until 24 hours. I see that these eating areas are a gathering point for young people. I understand that after the EPL, they watch football, and after watching football, they 'mengeteh' (have tea), but at the same time this shows an unhealthy hangout place. It is also a place where petty criminals relax for a while while waiting for their targets. So I request, although I know that the Federal Government, KPKT, does not have full powers, it is under the jurisdiction of the state government. However, in the Coordinating Committee meeting with the states, if possible, it would be good if we limit it, perhaps only until 2 a.m.? This is so that there is time for operators to clean the premises, so that the dining areas appear clean, and so that we can maintain the crime prevention elements. That is all, thank you.
Honourable Member for Batu Gajah.
Thank you, Mr Chairman, for giving me the opportunity to debate Item B.43 under Item 010000. I have two local issues. First, I have received complaints from several residents of Taman Menglembu Impiana Adril. They complained that they bought houses in 2002 and when they bought these houses, it was found that there was a lot of damage to the walls, roof and so on. This problem was informed to the developer, but the developer did not take sufficient initiative, only doing small repairs. They did not solve the problem, and the problem continues until today. Now, today, some of the people involved in this problem have to spend thousands of ringgit to carry out restoration work. This has become a problem for them. They have made complaints about this matter to the Ipoh City Council (MBI), and no action has been taken. They have also made complaints to the Ministry of Urban Wellbeing, Housing and Local Government (KPKT) and still have not received any feedback. They were only asked to provide evidence, photographs and so on. Everything has been sent to the ministry, but up to today, no action has been taken. So, this may not be the only problem, not the only housing estate facing such a problem. But I am sure there are many more housing areas experiencing similar problems. What is the remedy for victims like this when the developer has finished building and the CF has been issued to them to occupy the houses, there is damage that has not been completed, not repaired, and the problem continues. This is the first problem. The second is related to Item 020100 – Project Development and Implementation. The problem is roughly the same, namely at Taman Lembah Permai, Batu Gajah. A housing project by Juta More Sdn. Bhd. This project began about 10 years ago, around 2002. The project has started, people have bought, but until today they still have not received their houses. What is strange is that they have obtained loans from banks, and the banks have finished paying the housing developer, and every month they have to pay instalments to the bank. They have not received the houses, they have to pay instalments to the bank, and they do not have houses, so they have to continue renting. So this has become a burden on the house buyers in Taman Lembah Permai. They came to meet me, they complained to me and asked that this matter be brought to the ministry to resolve the problem as quickly as possible. They have also made complaints to various parties, and until today they have still not received any feedback. Next, regarding Item 080000, namely the Fire and Rescue Department of Malaysia. I have one issue, related to the Fire and Rescue Department of Malaysia Training Centre being built in the Batu Gajah Parliamentary constituency. I want to obtain some information about this project from the Minister. When will this project be completed? How many people will be trained at this training centre per period? What is the total construction cost for this project?
How will this project benefit Batu Gajah and its surroundings? What is the area of land that will be used for this project? Finally, I also want to touch on Item 050100 regarding Local Government. I strongly agree with what the Honourable Member for Sungai Siput said regarding privatising some of the work carried out by Local Government. Especially the work of cleaning drains, cutting grass, collecting rubbish and so on. Do we really see the actual benefit when this work is privatised? This is because in my constituency, I know there are big problems after these projects were privatised. I found that the work cannot be done properly. There are many times we see long grass, complaints are made to representatives, to the State Assemblyman and the Member of Parliament. When drains are blocked, people call the Member of Parliament's office to complain about blocked drains. When rubbish is not collected, the State Assemblyman's office and the Member of Parliament's office become the victims. We have to listen to all these problems, and when we tell the Council about these problems, they say, "Oh! We will contact the contractor." The contractor then takes even longer to solve these small problems. So I also request that the privatisation policy for projects like cleaning drains, cutting grass, collecting rubbish, building roads and small works like these be reviewed. Is it necessary or not, or is it better if it is maintained by the government itself? That is all, thank you.
[Bangun]
[Bangun]
[Bangun]
Yes, just the Honourable Member for Setiu, the Honourable Member for Bakri and the Honourable Member for Silam. Five minutes for each Honourable Member. The Honourable Member for Setiu.
Thank you, Mr Chairman. I want to touch on only a few matters. The first, 030000 – Housing Buyers' Claims Tribunal. I support the amount set, RM4.4 million, and this is a simple, cheap and also quick way. However, I find that there are allegations that claims for the type of damage, namely technical claims, are less popular because the process takes quite a long time. This is because on the tribunal side, the number of engineers responsible for carrying out inspections and so on is limited. So my question is, to what extent is the truth of these allegations, and if there are, what are the steps to overcome this problem. The second is regarding 050200 – Village Development. I also support approximately RM15.2 million. This is necessary so that basic infrastructure and social facilities in villages are provided to ensure the well-being of the people. So, facilities provided indirectly will help to boost their socioeconomics. So I suggest that villages be upgraded in line with the government's aspiration to make Malaysia a truly developed nation by 2020. So I want to touch a little on the supply of treated piped water. The percentage is increasing from year to year, and so is the electricity supply, also increasing. So I suggest that coverage be further increased in terms of water supply, electricity, road facilities and also including broadband services. Third, I want to touch on 040000 – National Housing. I also support approximately RM29.1 million. So the scenario in Malaysia today is that developers prefer to build luxury houses rather than affordable houses. This is driven by an attitude of prioritising profit alone. So medium-cost houses that are built do not meet the proper quality standards. So according to the findings of the International Real Estate Federation, the rate of increase in income is around 10% per year, while
the value of property increases by 20% per year. So some of these developers sell in bulk to investors. This will cause speculation and so on regarding prices. So house prices in urban areas are much more expensive compared to rural areas. So I suggest that land in urban areas and land in strategic locations owned by the government be partly set aside for the development of medium-cost housing to meet the increasing demand for houses. I also see that the measures proposed by Pakatan Rakyat look attractive when we look at them, but if studied in depth, perhaps many people are not aware that the soaring house prices in Selangor are due to the state government's action of imposing an additional charge of 30% on every house completed by developers in Selangor, based on the Town and Country Planning Act 1976, namely the Development Charge Rules 2010. So this development charge imposed by the Selangor State Government on developers when completing any project is among the causes of the sharp increase in house prices in that state. We can see this if we browse the internet, we can see at http://www.hmetro.com.my, the article "caj 30% lonjak harga rumah". So we can also refer to the Selangor State Government Gazette dated 25 November 2010.
Honourable Member, you may finish.
There is a little more. Then low-income people in this state are also increasingly desperate to own a home of their own when the government, this is a matter concerning Penang. According to a newspaper report dated 3 June 2012, affordable housing in Penang should have been RM42,000 but was set at RM72,000. This troubles the people, and there are also some who have questioned the promises Pakatan Rakyat made in building their future, when their promises to resolve the problems of the residents of Kampung Buah Pala, well, that is known to the public. After the 2008 General Election (PRU), nothing was fulfilled. This really touches the feelings of the government. That is why the government is called upon to resolve the problem.
Mr Chairman, what does this KPKT (Ministry of Urban Wellbeing, Housing and Local Government) have to do with this? I want to ask.
Never mind, the Minister will answer all the Honourable Members.
Housing, yes? Okay, that is all, Mr Chairman.
The Honourable Bakri, followed by the Honourable Silam. The Minister can answer after that, yes.
Never mind, the Minister can answer now.
Thank you, Mr Chairman, for giving Bakri the opportunity. I refer to Supply Motion 43, Item 020000 – Policy and Development. At present, the "biawak" swimming pool complex in Muar has been demolished. What is the government's plan for the area, who issued the order and gave the permission to demolish the "biawak" swimming pool complex? Who was awarded the development tender for the area, the value of the project, and the completion date of the project? Is there any development plan around the complex involving the golf course area and the rest house complex? If so, what development projects are planned and what is their value? Which company was awarded the tender and when is the completion date of all the development projects in the area? Is there currently a guideline prohibiting the construction
of buildings exceeding six storeys in Bandar Muar? If so, what is the rationale for this guideline being introduced? And finally, I want to commend the Minister and Deputy Minister for taking the trouble to sit in the House to answer our questions. That is all, thank you.
The Honourable Silam.
Thank you, Mr Chairman. I would like to touch on Supply Motion B.43 under Item 040100, namely National Housing. Recently, Mr Chairman, the housing problem in my area has become very serious, especially after ESSCOM announced that several water village settlements will be demolished, and this calls upon the National Housing Department to take action in cooperation with ESSCOM. So I appeal to the ministry that when these houses are demolished, if possible, do not move them to another place; build them in the same area so that it does not cause difficulties for the residents there. This area is within the town, and if it is built well, it will become a housing area that is very attractive to tourists as well as to local residents. We must also know that the residents who live in these water village houses are local people; originally they were local people, but later on PTI came and lived with them. So it is unfair if we make life difficult for these local residents just because of these PTI or illegal immigrants. I suggest that the security forces take action to expel these illegal immigrant residents so that they do not disturb these water village areas. I would also like to touch on Item 08000, namely the Fire and Rescue Department of Malaysia (Bomba).
In Lahad Datu or in my constituency of Silam, there are only two fire stations. One in Lahad Datu and one in Kunak. But we must understand that the Silam Parliamentary constituency is bigger than the state of Selangor. So, these two fire stations are insufficient; in fact Lahad Datu itself needs two fire stations. However, in Tungkuk there is not even a single fire station. So, I suggest to the ministry that, if possible, consideration be given to adding one more fire station in Tungkuk. Mr Chairman, I would also like to touch on Item 020400, namely Urban Wellbeing. I somewhat differ in opinion with the Honourable Bayan Baru regarding the residents' representative committees. In fact, in my area such residents' committees are very much needed, because in housing areas there is no representation, there is no committee that pays attention to the problems in the housing estates. Unlike in the villages where we have JKKK that pay attention to the state of development in the area. So, that is why in the housing estates in my area in Lahad Datu, problems such as clogged drains and damaged roads cannot be voiced, because there is no representation. So, I fully agree with this ministry that these residents' representative committees be implemented. Only I am somewhat disappointed, because I was informed that only 148 zones have been identified across the whole country, whereas in my area there are many housing estates that need these residents' representative committees. So, I suggest to this ministry that, if possible, these residents' representative committees be increased, not only in the big cities but also in housing estates, so that the interests of residents in these housing estates can be protected and their problems can be overcome. That is all, thank you.
Yes, please, the Honourable Minister.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I extend my thousand thanks to the Honourable Members who took part in the debate at the Committee stage of the Ministry of Urban Wellbeing, Housing and Local Government. I begin with the Honourable Lenggong. I thank the Honourable Lenggong, who recognised the Fire and Rescue Department of Malaysia, which has given recognition, not only recognition but also words of thanks. This is what the members of the Fire and Rescue Department of Malaysia welcome, when every day they struggle against all kinds of disasters with their lives at stake, and words of support like this are what they have been waiting for. The Honourable Lenggong also asked about assistance for the urban poor in Lenggong. I ask the Honourable Lenggong to submit the names of poor residents to the Lenggong District Council so that they can be considered for such assistance. Mr Chairman, I have studied the many speeches made earlier, and most of them were in the form of suggestions, views and also applications for projects. So, I will try to keep this answer short so that we can move on to issues more relevant to our debate tonight. The Honourable Lenggong also asked about the beautification project of the Lenggong town, that KPKT help the Municipal Council... I cannot read this.
Yes, continue as it is...
District Council, the Lenggong District Council.
The core point, regarding the proposal to improve the landscape of the Lenggong Valley project, is that it will be given attention by KPKT through the National Landscape Department, taking into account the existing natural resources and local technical requirements. However, the implementation will depend on the allocation available in 2014, but I will give consideration because, as mentioned earlier, this is a heritage area. That I will put forward, the heritage park.
Terima kasih.
The Honourable Lenggong also asked for the Lenggong Fire Station to be upgraded and for a fire station to be built at Kampung Kunyit. The Lenggong Fire and Rescue Station was built in 1964, older than the Honourable Member. [Interjection] The Department has applied for an upgrading project for the Lenggong Fire and Rescue Station in the fourth rolling plan for 2015, at a cost of RM3 million for 2015. At present, the Kampung Kunyit area falls under the care of the Gerik Fire and Rescue Station. Gerik is 2.9 kilometres away, with a response time of approximately five minutes.
The Honourable Minister.
The Department sets several criteria before building a fire station, namely the level of risk, the response time or respond time, population density and strategic needs. I have said 2015, Honourable Member. No need any more. Otherwise I will withdraw it. [Laughter]
Not the Honourable Member, I meant two places. In Pekan Gerik, the fire station needs upgrading, as mentioned by...
[Speaking without using the microphone]
But never mind, the details can come later.
Never mind, Honourable Member. I will give you the details later. I have to be quick because I only have about an hour. Then the Honourable Lenggong again asked once more that volunteer fire teams be expanded in traditional villages. The policy for establishing volunteer fire teams (PBS) is for areas that are outside or far from the respond time set by the Department, and which have a low fire risk, in place of establishing a fire station. The Department has no objection to traditional villages setting up PBS. The Department will provide assistance in terms of training, personal protective clothing and equipment, as well as fire engines. At present there are a total of 316 active Volunteer Fire Teams (PBS) with a membership of 12,389 people, and they have been registered with the Registrar of Societies (ROS). So, I welcome the traditional villages. That is Lenggong. Then the Honourable Sepang. The case of Taman Suria Permai, Taiping, which was mentioned earlier, where the houses were completed and occupied but the developer was in debt and did not settle the bank loan, so the houses were auctioned by a third party, namely Gale Force, who purchased the NPL or non-performing loan from the bank. This issue is about the sale of NPLs or non-performing loans by Gale Force, a buyer of NPLs from the bank. This is an issue for Bank Negara and the Ministry of Finance, Honourable Member, and it has already been answered by the Ministry of Finance on behalf of Bank Negara Malaysia in the Dewan Rakyat in the previous session. In this case the developer has been wound up and the developer has also passed away. The lawyer who handled the S&P between the developer and the buyer has also passed away. So, this case involved cash purchases, with the permission of the House, where after payment the lawyer and developer did not obtain a letter of disclaimer or redemption letter so that the title to the house could be released and charged to the bank. This case was brought to the High Court and Gale Force obtained a judgment to auction the house. However, as I said earlier, this falls under the jurisdiction of the Ministry of Finance because it is related to Bank Negara, Honourable Member.
Honourable Minister, may I clarify a little? Thank you, Honourable Minister. I think the Honourable Minister has two aspects. One, from the aspect of Bank Negara, but I think to prevent such incidents from happening again in the future, because in the case of buyers, they are wronged since they have paid the price of the house, but the mistake of the developer in not paying the bank caused their houses to be auctioned. So, the question is, I want to ask the Honourable Minister, how do we prevent such incidents from happening again? So, that is why I said earlier, and if the Honourable Minister really saw what I said just now, I said among other things, legal weaknesses in terms of the sale and purchase agreement, where there are always loopholes that allow developers to charge the whole land to the bank. So, I hope there will be an effort from the ministry to find a solution to this so that it does not happen again. What has already happened has happened, but to prevent it from happening again, I think the Ministry of Urban Wellbeing, Housing and Local Government can take the initiative to study this matter. Study it as a case study so that we can improve and protect consumer rights. Thank you.
Thank you, Honourable Member. As I said earlier, this purchase was a cash purchase, not involving a financing loan, where after payment, the lawyer and developer did not obtain a letter of disclaimer. So, however, whatever weaknesses the Honourable Member mentioned just now, I will note them and we will look into them. The Honourable Sepang also asked how many PPR units have been built in the Sepang Parliamentary constituency. For the Honourable Member's information, until now KPKT has not implemented any PPR projects in the Sepang Parliamentary constituency. Not yet. That is my answer.
The Honourable Member asked about abandoned projects in the Sepang area. There are two abandoned projects in the Sepang area, namely Taman Topaz, Dengkil, which is being rehabilitated, Honourable Member. It is nearly complete, and is expected to receive the CFO in December 2013. Topping up government allocations, the government will allocate approximately RM7 million to resolve the problem of abandoned houses, the abandoned project at Taman Topaz in Dengkil, Honourable Member. The second is at Taman Kenanga, Salak Tinggi, which is being rehabilitated by the rescue developer, NCT United, and is expected to be completed in April 2014. The Honourable Member spoke about the service loan, so that affordable houses are not auctioned, and cited Singapore as the best model, namely hire purchase. Loans are given to those who are eligible based on the buyer's financial capacity, and buyers need to maintain this capacity through prudent financial management. Failure to manage personal finances is among the causes of houses being auctioned. This matter must be managed by the buyer himself, because the government can only provide houses, but managing financing is the individual's own responsibility, Honourable Member. Now we move on to the Housing Buyers' Claims Tribunal, which was asked about by the Honourable Sepang earlier, who stated that the number of case filings at the tribunal has decreased: in 2012 there were 3,163 cases, while in 2013 only 1,660 cases were filed at the tribunal. For the Honourable Member's information, the reduction in cases may be due to buyers being satisfied with the quality of the houses they purchased. For 2013, up to 26 November 2013, a total of 1,743 cases have been filed at the tribunal. Of that total, 1,274 cases have been successfully resolved, while the remainder are still undergoing hearings at the tribunal. Nevertheless, the tribunal has taken the initiative by holding promotional programmes through mass media and distribution of brochures, as well as participating in property exhibitions to raise public awareness of the tribunal's functions. In addition, through the Blue Ocean Strategy, the tribunal has also established cooperation with government agencies and has opened mobile counters and on-site counters at UTC Perak, UTC Melaka, and a counter at DBKL on Wednesdays in the third week of every month to make it easier for the public to deal with the tribunal. Earlier the Honourable Sepang also asked about the issue that public awareness is not yet comprehensive regarding...
Honourable Minister, regarding the tribunal just now, I raised the matter that if they are not satisfied, they file for judicial review.
Apa dia?
When there is a judicial review by a party, and what I am worried about now is when a judicial review is made, the issue of cost, whereas in the housing tribunal there is no cost. So I hope the Honourable Minister may consider how we can keep a certain fixed price. If they file, and even if they lose, they would only have to pay a cost that has been determined. It's a... cost, not the cost of the judge's dispersion, which may be high and so on. I hope the Honourable Minister can look into this matter relating to this tribunal. Thank you.
Honourable Member, I agree with the Honourable Member. We must continue efforts to see how to help those involved in the judicial review just now. That proposal will be considered. It is in the form of a proposal and we will think about it later. Okay, for...
Honourable Minister, Taman Indah KLIA, regarding the subsidence of 44 houses.
I have not received the information. But if possible, I will allow officers to look at the garden, but this is specifically, Honourable Member. I think if...
No, if the Honourable Minister cannot give an answer, I ask the Honourable Minister to answer in writing.
Yes, may I give a written reply? I just want to bring to the Honourable Member's attention the matter of Dengkil, this Taman Permata. For the Honourable Member's information, at present the land has been provided by the Selangor State Government, as I said the other day. The only problem we have is determining whether they will buy houses on the new land that we will build. My officers have met with the State Secretary (SUK) of the state government, and they have thought of the best way to relocate them to this new area. However, the question now is whether they are able or need to buy these new houses or not. So this is still under discussion, Honourable Member. That is why I said just now, there's a light at the end of the tunnel, for this issue, with permission. The Honourable Member for Titiwangsa. The Honourable Member for Titiwangsa asked whether the Ministry of Housing and Local Government (KPKT) has the expertise to enforce the law on licensed moneylenders. For the Honourable Member's information, to enforce the law, namely the Moneylenders Act 1951 or Act 400, the ministry has police officers in establishment posts from the Royal Malaysia Police (PDRM), in addition to civil servants. They are placed within my ministry. In addition to the civil servants appointed as Moneylenders Inspectors, their standard operating procedure, or SOP, is as stipulated in [Act 400]. For the Honourable Member's information, just now the Honourable Member mentioned whether threats and so on had occurred. For the Honourable Member's information, the number and type of complaints against moneylenders from January to December 2013, I have the statistics here. For all states, the complaints received regarding threats are only nine, Honourable Member. The largest number is complaints or offences of not submitting, or late submission, of their transaction records to the ministry, at 673. So, looking at these statistics, Honourable Member, I think threats within the scope of licensed moneylending are not that serious, and so far there have been no convictions for complaints of threats. The Honourable Member for Titiwangsa also asked whether guidance was obtained from Bank Negara Malaysia on this issue? For the Honourable Member's information, [Act 400] is under the full regulatory control of the ministry. Therefore, no assistance or guidance has been received from Bank Negara Malaysia. The Honourable Member also asked what the maximum lending rate is? For the information of the Honourable Member for Titiwangsa, section 17A(1) of [Act 400] provides that licensed moneylenders may charge an interest rate not exceeding 12% per annum for secured loans and an interest rate not exceeding 18% per annum for unsecured loans. A breach of the provisions under this section, if convicted, will result in the licensed moneylender being fined not exceeding RM20,000 or imprisoned for not exceeding 18 months, or both. The Honourable Member for Titiwangsa also asked about the types of aid for the urban poor. For the Honourable Member's information, the urban poor aid includes, among others, house-building aid of RM40,000 per unit, rental aid of RM1,488 per year, house-repair aid, entrepreneurship and skills training programmes, hawker kiosks at RM15,000 per unit, and also the food basket programme, or provision of food baskets worth RM80 a month. The Honourable Member for Titiwangsa also mentioned incinerators, where she proposed that the NGOs be taken to developed countries such as Singapore, Taiwan, Japan and Europe to see how these incinerators can operate better and be located within the metropolitan areas of their cities.
big cities. For the Honourable Member's information, we have indeed discussed within our ministry bringing several NGO leaders on our visits to the countries the Honourable Member mentioned, so that they can see for themselves how these incinerators are safely built and managed in urban areas and even in the centres of their cities. The next question from the Honourable Member for Titiwangsa is about RM35 million for facility transportation at Taman Beringin. She asked what exactly this RM35 million is? If it is a tipping fee, is this money to be channelled through DBKL, Honourable Member? That is what was asked just now. So this RM35 million includes payments for other facilities besides Taman Beringin.
If the Honourable Member looks, it is indeed somewhat misleading, but if the Honourable Member looks at the item heading, what we actually mean is payment for other facilities such as landfills and transfer stations, amounting to RM34 million, and the rest is for tipping fees at several disposal sites. It is not necessarily at the Taman Beringin transfer station, with the Honourable Member's permission.
The Honourable Member for Seputeh, the Honourable Member.
I would like to ask for an explanation. The Honourable Member for Titiwangsa supports placing the incinerator in the Kepong area because it is not in her area. That day the residents who opposed the incinerator marched several kilometres to Parliament, made a noise there, and the Member of Parliament for Kepong and others were under great pressure. Yes, the Honourable Member may say, I myself have met and seen incinerators in Japan and anywhere else around residential areas. But local people do not believe it can happen in Malaysia, and they also do not want to see lorries carrying rubbish coming from afar to their settlements. They cannot imagine how it could happen.
[Bangun]
The Honourable Member for Titiwangsa. Wait a moment, Honourable Member for Titiwangsa.
Terima kasih.
Bring it to Titiwangsa lah.
Honourable Member, just a moment, Honourable Member, I will...
The Honourable Member for Titiwangsa, move over there.
Not allowed, Honourable Member, ask me lah.
[Ketawa]
Honourable Minister, I see that Taman Beringin is actually a place where today that area is used as a transfer station. If I am not mistaken, Taman Beringin is also a closed landfill site. If we look at Korea, in Seoul, I once visited a place that used a closed landfill site to build an incinerator. I think it would be good if the Honourable Minister brought this Honourable Member for Seputeh to visit this place. If my constituency had a place like this, 30 acres in size like Taman Beringin, I think I would allow the government to build an incinerator there.
Tentukanlah...
[Bangun]
Honourable Member, I...
Tukarlah.
Thank you, Honourable Member.
Just a moment, Honourable Member for Batu.
The Honourable Member for Seputeh does not know the area.
I think if we are talking about the incinerator, we can debate it when I reply, Honourable Member for Serdang.
[Bangun]
But, I want to tell the Honourable Member for Seputeh, I think the Honourable Member for Seputeh has not yet visited that transfer station. If not, the Honourable Member would know that, first, the transfer station was supposed to have a capacity of 1,700 tonnes a day, but now it operates at a capacity of 2,400 tonnes, Honourable Member. Whether the incinerator is there or not, 2,400 tonnes of rubbish, solid waste, will go there to be compacted and taken to Bukit Tagar. So, now your fact, I think this is part of our problem, when many who want to comment on this issue do not know in detail what the issue we are discussing actually is.
A little explanation, Honourable Minister, just an explanation, just an explanation, an explanation...
Just a moment, both of them, I agree with the Honourable Member for Titiwangsa, this site has been gazetted for waste disposal. At first there was indeed a landfill there, then we closed it, safely. After that we built a transfer station.
[Bangun]
[Bangun]
For the Honourable Member's information, the transfer station smells much worse than an incinerator. I once went to that transfer station, Honourable Member. I think the Honourable Member has never been there.
Honourable Minister...
If I went to the transfer station, Honourable Member, I would have to shut my mouth.
Penjelasan
Honourable Minister...
Firstly, as I said just now, the capacity is exceeded. So they sometimes have to pile the rubbish in open areas, which causes the residential area there to suffer an extremely foul smell. Now, if an incinerator or a waste-to-energy plant is built, we will be able to dispose of the rubbish at that very time. No need to send it to Bukit Tagar any more.
The Honourable Minister's explanation, an explanation.
Bolehkah? I’ll come to you when..
This is about the question of the Honourable Member for Titiwangsa, this is a question about the Honourable Member for Titiwangsa, just a moment.
Ya.
Please sit down, Honourable Member for Seputeh, Honourable Member for Batu.
Because the Honourable Member for Titiwangsa asked about payment to the operators of the disposal facility and transfer station at Taman Beringin, JPSPM, this Item 30100 amounts to RM35.5 million. So, from the description given under this item, it is indeed payment to Taman Beringin only, not to other places. I would like to ask the Honourable Minister whether this is a tipping fee payment or whether it is a payment to prepare this site for a waste-to-thermal plant that is being planned. Thank you.
Honourable Minister, yes, thank you. Taman Beringin is my constituency. That is why I think the residents there have for a long time asked that the transfer station no longer be located there. However, an incinerator will not solve the problem, because the history of Taman Beringin is that it was on the outskirts of the city 20 or 30 years ago. But now, Taman Beringin is a densely populated place and also has the potential for many more houses. So, that is why I think the government has not justified what the more effective options are for solving the problem.
I want to add just a little more.
No need, Honourable Member for Seputeh, you have said plenty already, this is not your constituency.
Just a little, Honourable Minister.
Honourable Member for Seputeh, there's no need, Honourable Member for Seputeh.
The name of the ministry already shows the Ministry of Urban Wellbeing (KESBAN). So, for the sake of the well-being of residents in Kuala Lumpur and the harmony of our society, it is better to move the incinerator to another place. Move it to a place in that area that is not so densely populated.
Honourable Member, first I want to answer the Honourable Member for Serdang. I do not know whether the Malay language of the Honourable Member or my language, we read the same. For the Honourable Member who just said payment to the operators of the disposal facility and the Taman Beringin construction station. It is not the same, that is not a disposal site, those are transfer stations, so the scope is that we also pay tipping fees to disposal sites throughout the country. So, is that clear, yes? This is not some biotical, an evil agenda of the government to take RM35 million to promote the incinerator that the Honourable Member accused just now. So, it is clear. Secondly, Honourable Member, this question concerns both the Honourable Member for Seputeh and the Honourable Member for Batu together. This is urban wellbeing, the well-being of the people, who are these people? Are only the residents of Taman Beringin the people? The Honourable Member must remember, the Honourable Member comes from a Member of Parliament from Kuala Lumpur, yes, the Federal Territory. I have said before. If we speak of urban well-being, in my view the residents of Taman Beringin have every right to object, but at the same time the government must look at millions of Kuala Lumpur residents who are also citizens and who need the protection of our government. So, we have a problem here. We have a problem. Of course, if the Honourable Member for Batu said just now that if they want to place it somewhere else, it can be done, it certainly can. But there are other considerations, and the other consideration, Honourable Member, is cost, it's cost. If we can afford it, if the local authorities and the people, we have just proposed an increase in assessment, for example. Okay, you have a problem with the contempt, fine. But the fact of the matter is, we are reluctant to pay any fees to the government, we have seen this trend. So if the people do not want to share this cost with the government, we will face what happened in Italy, Honourable Member. We will have a problem later.
That is why even now, the 1,700 tonnes at Taman Beringin, actually I want to tell the Honourable Member, we can solve that smell problem, because the incinerator or waste-to-energy plant that we will build there will have a negative pressure chamber. What does that mean, Honourable Member? When rubbish is piled there, the air does not come out, it will suck in the air as part of the, with the Honourable Member's permission, as part of the process of waste disposal, the burning of rubbish. The air is drawn inside. Now, when we go to the Taman Beringin transfer station, I mean the MP for Kepong is not here, if we go there and stand there, you will faint if you are not used to it. But if there is an incinerator or whatever technology we use there, we will ensure it's a negative chamber. I was just in Singapore two weeks ago with my senior officers, I went to the incinerator in Tuas, I stood in front of that incinerator, Mr Chairman, I did not even smell anything, I did not smell anything.
I just stood there, the only smell of rubbish was when they were washing and cleaning the lorries that had dumped the rubbish. Other than that, no stink. There is no smell because of the negative chamber. So, if we think in terms of urban well-being, with this incinerator, Honourable Member, it will provide comfort to the residents there because the smell will no longer come out. So, this is– I have this problem, Honourable Member. If the Honourable Member really thinks about urban well-being, be with us on this one. Yes, do not over-politicise it and do not overly inflame people's feelings, and I simply cannot think only about Taman Beringin. As the responsible Minister, I think about the residents of Seputeh, the residents of Batu, of Titiwangsa, all the millions of residents of Kuala Lumpur whom we have to look after, yes. So we are trying our best.
[Dewan riuh]
The Honourable Member for Seputeh, Seputeh again. Local authority officers are a closed service. The Honourable Member was once an Exco for Local Government. The local authority services fall under the jurisdiction of local government. So…
The Honourable Member for Seputeh does not know, Honourable Minister. Not working that day.
Just now my friend, my deputy, stood here and said why is the Honourable Member for Seputeh asking when this is the jurisdiction of the Selangor state. So, let us start with the Selangor state to open the service of these local authority officers..
Honourable Minister, that is why the Honourable Member was not made Exco, because of work that day.
Not so, Honourable Member. Honourable Member, this is under the Act, but what I think is that we must look at the civil service in total. Let us look, this is not only happening in Selangor, our whole country also faces the same problem. So, I would like to propose that the ministry carry out a study together with the JPA...
[Dewan riuh]
So it is not wrong, I...
This Honourable Member for Seputeh just talks, does not do the work either. That is why he was not made Exco now.
This one does not know what you are saying.
Honourable Member, we will propose ways, but as the Honourable Member knows, this is under the jurisdiction of the state government...
The Honourable Member for Lenggong, when did you become Minister? When did you become Minister, Honourable Member for Lenggong?
The Honourable Member for Gerik. The need for a fire station in the Kampung Padang Kunyit area, I did answer earlier, yes, to the Honourable Member for Lenggong. Then, matters relating to land are under the jurisdiction of the state government, Honourable Member, once again. The others are proposals and also
applications. So, while I thank the Honourable Gerik most sincerely for giving the ministry very good views, I will ensure that the Honourable Member's information, suggestions and applications are given attention. I am also close to the Honourable Member. So if there are any problems, you may come and see me. Honourable Sungai Siput, the study on – on what? Land leasing. Is the Honourable Member here? What was the name again, ground tenancy. Ground tenancy, yes. Firstly, this requires a study of the National Land Code 1965. The study of the National Land Code 1965 falls under the purview of the Ministry of Natural Resources and Environment. But I think it is, one point that is quite interesting too, and just now the Honourable Member said 200 for the MyHome housing. I actually like the Honourable Member a lot. He is not like the Honourable Seputeh. The Honourable Member stands up like a gentleman and speaks well, unlike the Honourable Seputeh who sometimes just... [Laughter] So Honourable Member, if I may, if there are suggestions, let us ask the developers in the Honourable Member's area to apply for funds under this MyHome, God willing. We will look into it and I will give due consideration to the Honourable Member's application. As was said just now, several local authority services have been privatised and should not have been, because the quality of service is not good. Honourable Member, the Solid Waste and Public Cleansing Management Act 2007 [Act 672] has not been adopted in the state of Perak. Not yet. What is happening is that the local authorities in Perak either carry out solid waste and public cleansing management services on their own or through their own subcontractors. In states such as Johor, Melaka, Negeri Sembilan, Kuala Lumpur, Putrajaya, Kedah and Perlis, the privatisation carried out by KPKT has shown better services than before privatisation. So we may think, we are thinking of holding discussions once again with the state of Perak to bring this Act to Perak, and hopefully with uniformity later, God willing, we will consider the best services. Honourable Labuan, hopes that sufficient budget is allocated for solid waste management and asks for solid waste management to be privatised. Now this one asks for privatisation. At this time, KPKT has indeed provided financial allocations to Labuan to further improve the quality of solid waste services. Among them is for purchasing vehicles and equipment, as well as assistance to buy land for disposal sites, Honourable Member. The Honourable Labuan has also asked for PPR flats to be rented in Labuan. In principle, the government has agreed to build a PPR project in Labuan, which will commence implementation next year, for the Honourable Member's information. For the project of the Headquarters of the Fire and Rescue Department of Malaysia (JBPM) in the Federal Territory of Labuan and the new fire station in Labuan requested by the Honourable Labuan, the department has approved the project for the JBPM Federal Territory of Labuan Headquarters at Rancha-Rancha in the third Rolling Plan for 2013, with a project cost of RM23.2 million. The components of this project involve the construction of an administration building, fire station, state logistics store, engineering workshop, multipurpose hall, staff quarters and a marine base to speed up response time if a fire occurs in waters. For the Honourable Bukit Gantang, the function of the Fire Air Unit and fire helicopters that was asked about, in high-rise buildings, that is high rise buildings, with permission, indeed have firefighting systems within those buildings as required under the Uniform Building By-Laws (UBBL) such as: (i) wet riser; (ii) dry riser; and (iii) hose reel and others. The firefighting strategy for high-rise buildings is through internal firefighting, in which fire personnel will enter the building and use the existing systems to fight the fire.
The Honourable Bukit Gantang also asked for training for fire personnel in handling incidents involving hazardous, radioactive chemicals and explosions. Honourable Member, the Fire and Rescue Department of Malaysia has set up a special team in every state, namely the HAZMAT Team, which is equipped with HAZMAT vehicles fully equipped with tools to handle incidents involving hazardous, biological and radioactive chemicals. This special team is indeed trained continuously to ensure the competence level of the personnel, and HAZMAT training is conducted by foreign and local expert personnel. The Honourable Bukit Gantang also asked about the role and function of fire helicopters. For the Honourable Member's information, among the functions and uses of fire helicopters are rescue, logistics transport, aerial surveillance, extinguishing forest and peat fires, and also humanitarian flights. During the fire incident at the Kampung Kerinchi flats, the use of a helicopter was not suitable because the rotation of the helicopter blades would cause the fire to spread faster due to the wind and also downwash. At that time, there was no need for aerial rescue operations to be carried out. I would also like to thank the Honourable Lembah Pantai, who wrote on Twitter to me, praising the effectiveness of the Fire and Rescue Department in the Kampung Kerinchi incident. This is slightly better than the Honourable Seputeh. [Laughter] The Honourable Lembah Pantai, she knows that if she says this, she sends an SMS, she tweets to me.
[Dewan riuh]
Okay, Honourable Bayan Baru...
Honourable Minister, are you best friends forever (BFF) with the Honourable Lembah Pantai? BFF? [Laughter]
I thought there were still PKR members who wanted to leave the party.
The Honourable Bayan Baru asked about the difference between PPR and PR1MA. For the Honourable Member's information, PPR is implemented to provide homes for low-income groups, namely household incomes below RM2,500 a month. PR1MA, on the other hand, is implemented for people in the middle-income group, between RM3,000 and RM7,000 a month. At present, there is no proposal to place PR1MA under KPKT. It is a different, too different market, with permission Mr Chairman.
[Bangun]
Although I understand what the Honourable Member has just said, our Prime Minister's Department (JPM) has so far only looked at low cost and has had no problems in terms of coordination, because I have chaired a Coordination Meeting between JPM, PR1MA, SPNB, UKAS and all state government agencies that build houses, these affordable houses, in one meeting. In the recent Prime Minister's Budget speech, there is a National Housing Council which will examine more closely matters that go beyond, that cross ministry boundaries, such as Bank Negara and also the banking system.
Honourable Minister, a little.
Make it short.
Thank you, Honourable Minister.
Thank you, Honourable Minister. I am not confused about PR1MA and PPR. I sincerely hope that, if possible, PR1MA is placed under the Ministry of Urban Wellbeing, Housing and Local Government, so that the Honourable Minister does not need to attend too many ministry meetings, so that all housing problems can be resolved under the Ministry of Urban Wellbeing, Housing and Local Government. I would like to support the Honourable Minister in obtaining power. This is openly. Okay, openly.
[Ketawa]
The problem is I am taking a power from the Honourable Minister of Finance. So, Honourable Member, thank you for your support, but for the time being, as we have just informed, there is still no proposal to place PR1MA under the Ministry of Urban Wellbeing, Housing and Local Government. I understand what the Honourable Member is saying. Later, we will also bring up these emerging issues at the National Housing Council. The Honourable Member also spoke about the issue of JPP in urban areas. I have answered this issue many times, not only in this august House but also in the media regarding this JPP. I wish to stress once again that JPP is different from the status of councillors or the local authority itself. Your local authority, Honourable Member, is a corporate body and a legal entity, and is an enforcement agency and also collects or imposes taxes. The function of JPP is only to help residents in a community to be actively involved in their areas. Honourable Member, please think of this as a way for us to get closer and to provide urban wellbeing. When urban wellbeing, this portfolio, was placed in my ministry, we thought about how to provide the best services for urban residents. Currently, 70% of Malaysians live in urban areas. The Federal Government has far more services than the state governments and local authorities in local authority areas. Hospitals, police, schools, almost all of them fall under the purview of the Federal Government. So we want to give urban residents an opportunity to discuss and hold meetings with the Heads of Federal Departments, which at present they do not have the opportunity to do, for example, to ask the Heads of Federal Departments. For example, as in a township or in a condominium building. We have joint management bodies, but they are established under the ROS (Registrar of Societies) and they do not have executive power or authority to summon the heads of departments to attend their meetings. This is the missing link, Honourable Member. So that is why I said just now that JPP is to complement. To complement the duties of the local authorities. I would like to inform the Honourable Member once again. The task of providing services to urban residents and building urban areas to provide this wellbeing is not the exclusive property of local authorities and state governments. The Federal Government also has the right to be there to develop urban areas, equally important as the state governments and local authorities. That is the basis for the establishment of this JPP. So let us not think too much. I know the Honourable Member will say, why not give it to the local authorities? It is not easy, Honourable Member. If the Honourable Member only thinks of local authorities with strong finances, that may be a good method. But the majority of the 148 local authorities in this country, firstly, have problems. Even paying salaries is a problem. Paying salaries is a problem. In terms of expertise, there is none. They do not even have enough technicians. Many kinds of problems. So the way is to provide a new platform that has authority, that has the power to bring the people in urban areas closer to the Federal Government or Federal Departments. No more than that, Honourable Member. Do not twist this to say that this is a way for us to engage in continuous politics.
Thank you, Honourable Minister. I am not trying to politicise this, because what I said is what the Honourable Minister himself quoted, because the Honourable Minister said that in the 13th General Election people did not support Barisan Nasional. That is why JPP must be established. So I want to ask the Honourable Minister, now, the issue is that officers cannot meet with residents. I do not agree with that, because officers should meet with residents. If there is a township and an RA wants to meet with an officer, they write a letter and they can hold a resident dialogue. This is the duty of officers, and Members of Parliament can also help to facilitate. So my question is, why do we create another bureaucracy where political appointments are made and then they become an intermediary. Not necessary. The Member of Parliament can do that work, this is the duty of the Member of Parliament. If the Member of Parliament cannot, councillors can also
write to the ministry. I am sure the ministry will send officers to meet them.
Okay. Thank you, Honourable Member.
Last point, last point. If the ministry truly wants to help the people, then give – we know that there are local authorities that do not have sufficient finances. Give block grants. Give money to the local authorities. Strengthen and consolidate the local authorities. This is the spirit of decentralisation. This is the spirit of federalism. This is what we want, Honourable Minister. Do not centralise all power in Putrajaya. Return power to the states and return power to the local authorities.
[Menyampuk]
Okay. One at a time, Honourable Member. Honourable Member, once again, Honourable Member, although you deny that this is a political issue, from the tone and also the approach of the Honourable Member, I think there is concern. Once again I would like to give an assurance to the Honourable Member that we in Barisan Nasional, the Federal Government, are sincere. Remember, we give. The Honourable Member just said to give allocations to local authorities. We have spent RM300 million to be given to local authorities every year. RM300 million is not a small sum, Honourable Member. We have never run away from our responsibility to help local authorities. We have problems and I want to tell the Honourable Member. Just now you said that supposedly why are powers centralised to the Federal Government. I want to tell you if we talk about politics. How many times, with permission Mr Chairman. How many times have local authorities and state government leaders in opposition-held states thanked and told the people there that these allocations come from the Federal Government. How many? You talk about separation of power, you want to talk about fairness. [Interjection] It is not and you are not being fair. The majority of local authorities in areas represented by the opposition do not give an inch of recognition to the Federal Government. That is the main problem. So if you want to be fair...
Honourable Minister, Honourable Minister.
Honourable Member, wait. Wait, Honourable Member. I will give you a chance. Wait. If we want to be fair, you must also say, with permission, that the Federal Government helps. We build roads, we collect rubbish. We do many things, Honourable Member. But I can tell you, we do not get recognition from this government. So give us the opportunity, the Federal Government, to approach the people there, not because we are Barisan Nasional but because the services in urban areas, I think 70% of them are provided by Federal Government agencies. As simple as that.
Thank you, Honourable Minister. So, Honourable Minister...
So, Honourable Member, there is no need to make such a fuss about this issue.
Ya, sikit respond tentang isu ini. This is the problem dengan Kerajaan Barisan Nasional sebab you expect rakyat berterima kasih. You expect people to but we have to know. Kita kena tahu bahawa duit itu adalah daripada rakyat.
[Dewan riuh]
[Interjection] The people pay taxes. So if we carry out our duties well, especially in urban areas, the people have very good information.
Yang Berhormat.
They can know who is spending on that. But the core issue is that we cannot ask people for thanks.
Honourable Member, that is not a matter of thanks, Honourable Member. I did not say we must be thanked.
This is the government's responsibility.
I only said recognition. The problem now with the opposition is that it is not only about recognition. They say the Federal Government under Barisan Nasional has never thought about them in the cities. That's more problem.
Akan tetapi...
I want to tell you, I am not saying thank you.
But people in the cities pay the most taxes.
One at a time, Honourable Member.
No, no, no. Wait, wait.
Honourable Bayan Baru, sit down first, Honourable Member.
But we question that people in rural areas need services.
Tidak apalah.
True. But we want those people who pay taxes to be given reasonable services.
That's right. This is what is reasonable.
So let us not have a sentiment that people must thank us because we give.
Honourable Bayan Baru.
Okay, Honourable Member.
[Dewan riuh]
This is not the issue. In terms of democracy, we must respect the decision of the people.
Honourable Bayan Baru.
Thank you, Honourable Member, Mr Chairman. This is the end of my argument on this JPP. I am also tired of repeating myself like this. I want to tell Mr Chairman, actually we have heard many of their arguments. In this House, in the newspapers, in ceramah.
I will ask only one thing. They say this JPP takes over the powers of local authorities and so on. Until now I do not know which provision in the Federal Constitution or which law this JPP takes powers from local authorities. Not one of them has shown me a constitutional provision. So I raise my case. Honourable Member, recycling rate too low.
Has Barisan Nasional ever thanked the Pakatan Rakyat State Government?
I did not say thank you. I never said thank you just now. I only said give recognition.
Yes, so why can we here thank Barisan Nasional?
Sometimes they give MARRIS allocations. After that they use MARRIS money for other things. I know.
We are ten players. We contribute most states in the country.
I know what is going on in Selangor, Honourable Member. Honourable Member, MARRIS is also used for other things. Anyway, Honourable Member, recycling rate too low. What time does my time end, Honourable Member?
10.30 malam.
Oh, 10.30 p.m. Thank you, Mr Chairman.
Half an hour more. You may continue for another 15 minutes.
The Honourable Member for Bayan Baru also said something about the recycling rate. This recycling rate is too low. Honourable Member, if that sentence is used – who was it just now, Honourable Member? Oh, the Honourable Member for Serdang just said it. The start of this sentence is "the government has failed." Actually, Honourable Member, the issue of recycling is not only the government's responsibility. The residents. No matter how much money you spent, with permission, even hundreds of millions, if residents do not want to change, whatever government is placed here, that rate will increase.
[Bangun]
So it's a misconception. If you say it is a failure, it is because we have spent a lot of money and carried out many activities to ensure that our recycling can be raised to a more reasonable rate. So in 2020, if I am not mistaken, we estimated 22%. Now it is about 10%. A little less than 10%. In 2020, about 22%.
Minta penjelasan.
You want to ask about recycling too?
Yes, indeed. Who first?
The Honourable Member for Serdang first.
Let me go first. May I ask...
I first.
The Honourable Member for Batu first, Honourable Member.
I agree that recycling – I do not want to say it has failed, because we have not yet implemented it. I still remember that in 2006 there should have been a deadline to ensure that all waste collection areas, namely household disposable solid waste, were separated according to what can be recycled, and that we no longer throw everything into the same bin. If that is implemented first, then we can speak of disposal through incineration. Otherwise, people's habit is that everything gets mixed up. What can be recycled and what cannot goes in to be burned. So I think that is the first step that should have been implemented, but the government has not yet begun to implement this. In all other countries, there is already separation of this waste according to the material we throw away. I would like to get a comment: is the government still committed to dividing out the garbage?
I want to add, I want to add.
Yes, we are committed. We are committed to separating this garbage, or this waste management, from its source, from the house. Honourable Member, we have many other constraints. To say the government must do that, I also agree. I would probably – I might be the Minister who would be most grateful if we were able to do it, but we have other constraints. Other constraints, Honourable Member, in terms of budget. In terms of ability and voluntariness, or willingness, of residents to pay for these services. All of this
requires more lorries. Are we willing too? Are we, as residents in this urban area, able or willing to pay? Of course we say the government should do everything, but the government also has limited finances. That is why there are areas where we have done it, Honourable Member. Not everything we have not done. There are some that we have done, but to say all of Malaysia, I am the first to say we can no longer manage solid waste like this. However, that does not negate the issue of the need to establish an incinerator or waste-to-energy plan in Taman Beringin. Honourable Member for Serdang.
Just now the Honourable Member for Titiwangsa proposed bringing a delegation of NGOs to a place that implements incinerators. Why did he not propose bringing a delegation to review, for example, the policies in San Francisco or Singapore in terms of raising recycling rates? Why are Singaporeans so very different from Malaysians, when they can recycle up to 50% or 60%? Why can a city like Kuala Lumpur not do it – let me elaborate a little. This is because when I lived in the United States, in a small place, Durham, North Carolina, where Duke University is, the local government provided the space and convenience for recycling, as the Honourable Member for Bayan Baru said. That government provided different bins so that we can separate waste at source, but we do not see what the Ministry of Housing and Local Government (KPKT) provides in terms of sorting to make it easier to recycle.
Honourable Member, I myself also lived in America, Honourable Member. San Francisco – I was there for five years. Same as us. You six years, I five years.
Why didn't you learn?
We are from the same kampung, right, Honourable Minister?
However, the Honourable Member only sees the big difference between San Francisco and Salak Tinggi or Jerantut, sorry, which is the culture and also the type of food or waste that is thrown away. We have curry. We have there, dry. Mostly dry. So there are a lot of problems. I am with you, Honourable Member, but you must also, when we want to improve this service...
[Bangun]
All from the USA, Honourable Member.
The Honourable Member for Seputeh, sit down first. I cannot see the Honourable Member for Serdang.
I'm not Serdang.
USA, everyone stand up.
I cannot get my line of sight. Sit down first, Honourable Member. Ha, that's the Honourable Member for Serdang, he can be seen. Wait a moment, Honourable Member, yes. Afterwards. I want to tell you, you know it's all about culture. As for the Singaporean, come on, Honourable Member, I too have only just visited Singapore, but although we can look at Singapore in terms of policy, to see Singapore as an example that we can apply in our country, you know it is not possible.
[Bangun]
Thank you, Honourable Member. Since returning from this sick leave, this is the first time I can speak.
Thank you, Honourable Member for Baling.
Honourable Member, I want to ask the Honourable Minister: do you agree with me that if we look at this happy night in this august House, over there the opposition parties are very much saying, supposedly, that we are not grateful to the Barisan Nasional people, all sorts of things, but at the same time, the Honourable Member for Jelutong called someone a mangy cat? Who?
[Dewan riuh]
Then he was rebuked by the Honourable Member for Nibong Tebal, who told him to withdraw it.
Seriously. Come on...
[Bangun]
Honourable Member for Baling, you said follow here... Please don't make it political.
They themselves are not grateful. They themselves want to catch the mangy cat. Today, because of them... supposedly... Don't stage a charade!
Yes! We're talking about recycling, why is he talking about this?
The Honourable Member for Jelutong, wanting to shame us here, supposedly.
[Dewan riuh]
Wanting to be a hero, wanting to defend the people!
Balik, balik.
Mr Chairman, poor him, he has just come back. Just come back. Never mind, forgive him.
Do you agree, Honourable Member?
Mr Chairman, if those words came from the Chairman of Lembaga Tabung Haji, I would agree. [Laughter] I very much agree, because Lembaga Tabung Haji, they are good people.
Honourable Minister.
The Honourable Member for Jerlun.
Terima kasih.
The Honourable Member for Jerlun, Honourable Member.
Thank you, Honourable Minister. On the same subject, the recycling problem, all of it, just now the Honourable Minister spoke about the problem of societal culture. We are aware, I think most people, especially in the towns, let alone in rural areas, see that when it comes to the duty of collecting rubbish, managing rubbish, the local authorities (PBT) and workers, whether from E-Idaman, Alam Flora and so on. The people say that making rubbish is our job. So, to what extent does the ministry plan, in terms of educating the public, and the budget, to create awareness that caring for cleanliness is a shared responsibility? If there is no rubbish, then the work of PBT workers would decrease and the budget could be used for other work. Please comment.
Saya setuju.
Same point. Briefly.
That is why I said, Honourable Member, that the issue of recycling cannot be dumped on the government's shoulders.
It's all about the individual, Honourable Member. It's all about our culture. I want to say here that because in our country the rubbish is rather wet with curry, with all sorts of things, we also have a problem, we have to...
tambah lori yang berbeza dan sebagainya. Semua ini kos. It is all about cost. Jadi kita kena imbangkan semuanya. Semua kita kena hendak yang baik boleh tetapi are we willing to pay for it? That’s all. The bottom ...
[Bangun]
I am the Minister, briefly.
Just a moment, Honourable Member, let me finish speaking, just a moment. But the main point is whether we are able, capable or willing to pay for the services we want? That is the bottom line. If the government is asked to pay, that is also possible, but what is the other side? The other side is fewer hospitals, we will not have enough roads and various other things. This is the consideration that we in Barisan Nasional, this Federal Government, think about every day. The other side only wants, but we are the zero something.
I, I...
Briefly, Honourable Member.
Yes, very brief. I do not want to politicise politics. I want to debate and propose that the government, whether Barisan Nasional or anyone else, take effective steps to save the environment. I listened attentively just now. You mentioned Korea and Japan having incinerators, but when it comes to the habits of the Malaysian people, we say it is not necessary to follow the Koreans, to follow the Japanese. We have a shared responsibility to shape a new culture so that we can together take responsibility. For me, it is not wrong if we together want to start this recycling culture. Let me propose my suggestion: we divide into two simple divisions. One is to separate organic from inorganic. Let the private sector collect the inorganic back, because they will profit from recycling. We can give the government what is to be burned or made into fertiliser, then take only the organic. So if this can be done, we will reduce it, and I am especially concerned about the incinerator. Items that we want to make into glass or plastic are all put into what will be burned. That will not only cause pollution, but also waste very precious resources. Thank you.
Honourable Minister, do you agree or not, Honourable Minister, that recycling culture can actually be practised when we have incinerator technology? I say so because when our country uses incinerators, indirectly we have two levels of segregation of the waste. First, in homes. Second, if any house does not do segregation, but when it reaches the transfer station that has an incinerator, then automatically that technology separates these items, because it raises the calorific value to obtain more electricity power. So indirectly, when this separation is done at the incinerator level, over the years this culture reaches residential homes. I see in Korea, it took 22 years to cultivate the culture of distinguishing their waste between what can be recycled and what is thrown away.
Yang Berhormat Titiwangsa, I think is opposite. Ada pembahagian dan pengasingan dahulu, baru ada incinerator. I think this is not the other way round.
No, no.
There is technology, a lot of technology, Honourable Member. Honourable Member, what the Honourable Member for Titiwangsa said also has some truth, because in Semenyih, for example, there are materials separations. The Honourable Member says it is incinerator. So it is two different technologies. Both are right, but I tend to believing Honourable Member for Titiwangsa this... [Laughter]
Honourable Member, again. I want to give one example in Putrajaya. In Putrajaya, not everywhere has this recycling system. There are areas that we call communal bins, at local central places. [Interjection] Local recycling centres. That means we have to throw away the rubbish, we go, start the car engine and go there. Throw away oil, throw away paper, throw away all sorts of things there. It is separation. How many are doing it? Nobody. We only talk. So, the question now, the bottom line is: work with the government, my dear friends from the opposition side, work...
May I give one example? Look at that cafeteria. Drink a little plain water, then throw that cup into the dustbin.
I agree we..
Look! What culture? Did the Honourable Member for Arau hear? Starting from the Minister, let our cafeteria do it first.
Okay, Honourable Member for Bayan Baru. I want to move on a little. I think – I am again a little disappointed, Honourable Member, because sometimes if this issue is not answered in Parliament, eventually it will become a problem at the DAP ceramahs held every night in Penang. Honourable Member said that the allocation of RM40 million for TP1M is insufficient and asked KPKT to consider the application from the Honourable Member for Bayan Baru to continue the TP1M application. Then, Honourable Member said that earlier, I myself had said that RM500 million had been allocated for TP1Malaysia. So the insinuation the Honourable Member just made is: what happened to the RM500 million? Why only RM40 million? But if the Honourable Member carefully scrutinises the answer, the Honourable Member will understand that the RM500 million that was mentioned is for the RMKe-10 allocation between 2011 and 2015. So don't make insinuations that we are making money disappear and so on. So in fact, the government allocated a total of RM500 million for the implementation of the TP1M project and also this Housing Maintenance Programme throughout RMKe-10. It is not even TP1M. Sorry, it is PPP. I did not say that the RM500 million was for TP1Malaysia. That is the Housing Maintenance Project (PPP). So, get the facts right, Honourable Member. Next, I want to go to the Honourable Member for Serdang. Has the Honourable Member for Serdang already answered?
International bid. Will that information be published openly?
Oh! Yes. For the Honourable Member's information, there are also those who say the Honourable Member, in a press statement, said that my Director-General has misled the Minister. Actually, the person who is confused is the Honourable Member himself... [Laughter] The Minister is not confused, the Minister is very focused on his work. We know what we are doing, yes. My Director-General is among the best. So, this is your Director-General, Honourable Member..
That's his word, not my word.
Yes, yes, I know, but the Honourable Member spins it out of context. That's normal. I want to tell the Honourable Member, actually it is true that we first thought about incinerators. Incineration is one of the technologies that can be adopted. But this incinerator, Honourable Member, just now you mentioned Broga. There are many differences. In the past, we did that, there was objection, so we did not do it. Now, we have learned from several weaknesses in the Broga Project. First, we want the technology adopted to be a mature technology, one that has been used for decades by countries all over the world. Second, it must be value for money. There is no point in using a technology if the cost is too high. Third, environmentally friendly. Three things, three matters. So, when I talk about incinerators, it is because we think it is the best. But when we held a meeting called a Problem Solving Meeting between the Right Honourable Prime Minister and me as Minister,
because the Right Honourable Prime Minister, Mr Chairman, is very focused. There is a problem, we meet for 10 minutes, you must convince the Prime Minister. This is the Honourable Member for Pekan. You do not have to say hello, good morning Sir, no nothing. Sit down, tell him, solve the problem. So in that Problem Solving Meeting, we took an approach to be more transparent, as the Honourable Member wants. We open the technology to all companies that wish to provide technology from all over the world. So, once we – this tender is an international tender, an open international tender that will be advertised, and will display all the data the Honourable Member wants. You know, Honourable Member, we do not want, as I said, we want the best for the people and residents of Kuala Lumpur. So, that is my answer. Other Honourable Members, there are 10 minutes left.
The Honourable Member for Jerantut asked about open spaces in Jerantut. The Government, through the National Physical Planning Council, has stipulated that every 1,000 residents in our country should have two hectares of open space. In this regard, the local planning authority needs to ensure that 10% of the land proposed for development is gazetted as open space, which must then be gazetted by the state government and developed according to its purpose, namely public recreation. Under the Tenth Malaysia Plan, the government will assist local authorities (PBT) to develop contiguous open spaces in urban areas, in line with the long-term plan of the Ministry of Urban Wellbeing, Housing and Local Government. The Honourable Member also mentioned applying for the Program Azam Bandar in Jerantut. I take note, Honourable Member, that this is part of the representations that were made earlier in the form of requests. The Honourable Member for Kuala Kangsar said that certain matters in the planning guidelines and the Uniform Building By-Laws (UBBL), such as those concerning back lanes and setbacks, are not practical and need to have flexibility and uniformity. We understand and take note of that, Honourable Member, and the Uniform Building By-Laws are dynamic and are constantly reviewed from time to time to take into account current needs and demands. I think the Honourable Member has already raised this two or three times. If possible, Honourable Member, please give me an official letter on this issue and we will bring it to the National Council for Local Government (MNKT). On the flash flood issue, Honourable Member for Kuala Kangsar: the provision of retention ponds is a condition outlined by the Drainage and Irrigation Department (JPS), the purpose of which is to control the potential for flash floods in an area. The size of a retention pond depends on the scale of a development, and these conditions will be imposed on a development by JPS and PBT before the plan approval is issued. This is enshrined under section 21 of the Akta Perancangan Bandar dan Desa, under which planning permission must be obtained from the PBT before carrying out any development and construction. The Honourable Member for Pasir Gudang is not satisfied with the services provided by South West Management. I also cannot read this, Mr Chairman, whether...
[Menyampuk]
[Ketawa]
The Honourable Minister has not yet answered the 50 km issue.
Yes, yes, Honourable Member, I apologise. Thank you for the Honourable Member's views. Returning to the incinerator in Taman Beringin. The Honourable Member just said that the requirement from the Department of Town and Country Planning is that the 50 km rule must be observed. For the Honourable Member's information, that requirement is no longer applied. The Department of Town and Country Planning
Peninsular Malaysia has in fact already lowered, and has removed that requirement from their website. That was the old requirement. Now we rely on the Department of Environment (JAS). The Department of Environment says that if they find, not us, the Department of Environment finds that an incinerator or waste-to-energy plant, although close to residential housing, is safe, then it can be approved.
But can I still find that requirement on the website of the Department of Town and Country Planning?
No, no. We have already said it may be the old one, but we have discussed it. This is my official answer to the Honourable Member, okay. You don't have to read the website. You take it from the horse's mouth, with the Honourable Member's permission. I am telling you that the requirement is no longer applied, and I agree that if there is time later, Honourable Member, if you go on holiday at the end of this year, go to Tokyo. Look closely at the incinerator there. Now, the Honourable Member for Petaling Jaya Selatan, abandoned projects. From 2009 to 31 October 2013, 136 abandoned projects have been completed and successfully rehabilitated. A total of 44 projects are being rehabilitated and 25 projects are at the initial planning stage. Regarding the two abandoned projects in PJS 1 and PJS 2, the information from the Honourable Member for Petaling Jaya Selatan just now was not very clear. I ask the Honourable Member to forward the information to KPKT for further investigation, and a written response will be provided.
Honourable Minister, I already told you just now.
Yes, it was not very clear to them.
Jelas.
No, mungkin dia tidak tangkap. Never mind, I deduct or we go to the Hansard ya.
Okey.
But I promise, I promise we will give the Honourable Member written information. Besides, it is too specific, Honourable Member. You should know this, it's your second term already. Mr Chairman, five more minutes, okay.
The Honourable Member may finish.
Okay. I just want to say a thousand thanks. As for the others, they are only suggestions...
On the matter of the build-then-sell concept.
Okay, build and sell. Honourable Member, I have just read here. At present, there are several developers who are using the build-then-sell concept. This includes several GLCs. Most countries apply the build-then-sell concept in line with the sell-then-buy concept, just like in Malaysia, which is sell-and-build. Developers are less interested in the BTS concept, or build-first-then-sell, because it requires very high financing from banks and their own companies. KPKT is still looking for the best method for implementing the BTS concept. Nevertheless, I understand that the Minister before me had promised that this concept would be introduced in 2015. However, Honourable Member, the situation is rather dynamic. One of the reasons we have the problem of exorbitant house prices is that the supply of houses, whether from large or small housing developers, is insufficient. I have one concern only, Honourable Member. Although I understand the Honourable Member's wishes, I am concerned that if we use this build-first-then-sell concept, the problem will be that the small housing developers will shut shop. They will not be able to obtain bridging funds or financing funds. The
big ones like GLCs and the large developers may be able to survive in that situation. So, what will happen is that in small towns and medium-small and medium-large towns, they will not be able to build houses under this concept. But we have time, Honourable Member. I think we have another year to think about it together, but it has many more dynamics. It's not just about what you said just now, these housing developers will manipulate it and run away. That is one aspect of this issue. There are many more aspects that we have to think about together. So, Honourable Member...
[Bangun]
Honourable Member for Seputeh, yes. Yes, what is it, Honourable Member for Seputeh?
[Dewan riuh]
Yes. That hotel. The calculation of the door tax. Both of them here, FT Malaysia, they are also very concerned.
No, later on. Honourable Member, later about the door tax after this...
That is DBKL. He doesn't know, this Minister of KPKT.
This is the Ministry of Federal Territories, the Honourable Member can ask him. I was only answering about the housing licence for the Swiss Hotel just now. The housing licence and advertising and sales permit that have been issued to Dorsett. You mentioned the hotel just now?
[Menyampuk]
I didn't mention it, later. Dorsett Hotel Swiss. Based on the planning permission and development plan approved by the Subang Jaya Municipal Council (MPSJ). In the planning permission and development plan, MPSJ did not impose any restriction that the Swiss Hotel could not be sold. Therefore, the licence and permit were issued by MPSJ.
At that time the Honourable Member for Seputeh was an Exco. He was an Exco at that time, he was an Exco.
So, perhaps the Honourable Member was an Exco at that time.
At that time he was an Exco. The Honourable Member for Seputeh was an Exco at that time.
The Swiss Hotel can be sold, for example the Swiss Hotel at Four Seasons, St Regis and West Residences. W Residences, I am afraid I might get it wrong. W Residences, it could be West, okay, with planning permission and a development plan approved by the PBT. However, the licence and sales permit for Dorsett Hotel Swiss have been hung or suspended until the court's decision is obtained by MPSJ. That is my answer, Honourable Member.
I asked the Councillors of MPSJ. Later, Honourable Minister. The Councillors of MPSJ asked me to ask the Honourable Member why what MPSJ approved was a hotel. To build another hotel. However, the ministry gave them a licence to operate service apartments. This is what has caused them problems.
It's all right, Honourable Member. Later I will look into it. There is an answer here and it's very specific. I cannot answer you and I don't want to misquote. Mr Chairman, because this involves big names, hotels, and we do not want to give a bad impression to these companies until I get the correct information. In closing, as for the others, if there is still...
Mersing.
Oh, Mersing. Oh yes, Mersing. Where is the Honourable Member for Mersing? This is the most important because it concerns our culture. He
asked that the mamak shops that open 24 hours be closed at 2 a.m. [Laughter] These mamak shops, Mr Chairman, are part of our culture and an icon of urban life. I don't know whether this is a proposal that urban residents would accept, but the ministry's answer here is that under the law on trade, business and industry, the PBT may set the operating hours of business premises. Generally, food premises open until 10 p.m. If they wish to open 24 hours, approval from the PBT must be obtained. So, we cannot make a blanket service. In closing, as for the others, I ask that I may answer in writing. I just want to bring one fact, Mr Chairman, I want to say - I am very proud that recently my ministry, the Ministry of KPKT, has received recognition, obtaining the MS 1900:2005 Syariah Compliance certificate. The ministry is Shariah-compliant.
Like Tabung Haji.
Like Tabung Haji. But the difference here is a little uniqueness of KPKT: the officer who really ensured that the MS (Malaysian Standard) could be complied with is one of my officers who is Hindu and not a Muslim. Not Hindu and not Muslim, I mean. Indians and non-Muslims. I express a thousand thanks for his commitment to ensuring my ministry is Shariah-compliant, and on behalf of the KSU, my Deputy who is present today, who today...
Thank you to the Honourable Member for Baling.
Those present here today, together with us, we express a thousand thanks to that officer for giving KPKT such a beautiful name. Thank you.
Congratulations, Honourable Minister, congratulations, Honourable Minister.
Thank you, Honourable Member. It is not finished yet. Honourable Members, the question is that the sum of RM2,371,345,000 for Purpose B.43 under the Ministry of Urban Wellbeing, Housing and Local Government, forming part of the Schedule, be agreed to. [Question put and agreed to] [Sum of RM2,371,345,000 for Purpose B.43 ordered to form part of the Schedule]
The question is that the expenditure of RM1,543,239,400 for Purpose P.43 mentioned in the Development Estimates for 2014 be approved. [Question put and agreed to] [Sum of RM1,543,239,400 for Purpose P.43 approved as part of the 2014 Development Estimates] [The Assembly resumed sitting] [The Deputy Speaker (Datuk Ronald Kiandee) presided
Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Wednesday, 27 November 2013.
[The House adjourned at 10.33 p.m.]