Dewan Rakyat · 13 November 2014

15th Parliament, session 2, meeting 3 · 612 turns · 36,283 words · official PDF ↗ · Digital Hansard ↗

522 of 612 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Mr Speaker presided over the Sitting]

Oral Answers to QuestionsQuestions

Mohd Zaim bin Abu HasanUMNO · BNParit · questionEN

1. Dato' Haji Mohd Zaim bin Abu Hasan [Parit] asked the Minister of Finance to state the guidelines used for the appointment of Chief Executive Officers in every government-linked company.

Datuk Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera, salam 1Malaysia. Thank you, the Honourable Member for Parit, thank you Mr Speaker. A question on Chief Executive Officers (CEO) in every government-linked company (GLC). Mr Speaker, at present the appointment of Chief Executive Officers (CEO) in every government-owned company or Minister of Finance Incorporated (MKD) is based on several criteria that serve as guidelines, among them the following: (i) possessing at least a first degree in a relevant field; (ii) having specific expertise or industry skills relating to the core operations of the company; (iii) having experience holding a senior or important position in a company; (iv) being charismatic and showing strong leadership and a high sense of responsibility in steering the company; (v) passing the integrity screening of the Malaysian Anti-Corruption Commission (SPRM) to ensure a high level of integrity; and (vi) having a certain attractive personality with a clean and excellent career background. Guidelines relating to the appointment of senior officers, particularly Chief Executive Officers (CEO) in government-linked companies (GLC), are in turn enshrined in the Green Book: Enhancing the Effectiveness of the Board of Directors, published by the Putrajaya Committee for GLC High Performance. Among other things, candidates for the position are selected based on the individual's experience, expertise and ability to steer a GLC. In addition, every GLC CEO is required to have high integrity and to understand the various roles of the government in socio-economic management as social development, economic development, regulator and investor, and to embrace the three main pillars of the GLC transformation programme, namely the foundation of national development, focus on performance, and governance that values shareholders and the management of stakeholders with an interest.

Datuk Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

The appointment process for Chief Executive Officers (CEO) of government-linked companies (GLC) usually takes place through a nomination process at the Nominating Committee at board of directors level. Subsequently, the committee's recommendation will be submitted to the board of directors for endorsement and appointment by the Minister of Finance. At the Nominating Committee level, the committee will carry out screening through various means, including obtaining a comprehensive report on the CEO candidate in terms of professional career, character and record of misconduct from various reliable sources in the industry and talent-search agencies. For certain GLC CEO appointments, additional approval from the Ministry of Finance is also required, depending on special shareholder rights and if it is stipulated in the memorandum and articles of association. Among examples of CEO names that we already know are: CIMB Holdings Group Berhad - Tengku Datuk Zafrul Aziz bin Tengku Abdul Aziz; Malaysia Airlines (MAS) - Encik Ahmad Jauhari Yahya; Telekom Malaysia Berhad - Tan Sri Zamzamzairani Mohd Isa; Tenaga Nasional Berhad (TNB) - Datuk Seri Ir Azman Mohd; Boustead Holding Berhad - Tan Sri Lodin Wok Kamaruddin; Malayan Banking Berhad (Maybank) - Datuk Abdul Farid Alias; Sime Darby Berhad - Tan Sri Mohd Baki Salleh; Khazanah Nasional Holding - Tan Sri Azman Mokhtar; and Petronas - Tan Sri Shamsul Azhar Abbas. Those are examples of the names of GLC and MKD CEOs. There are many other names, Mr Speaker. I am only giving examples. Thank you.

Thank you Mr Speaker, and thank you for the reply from the Honourable Deputy Minister. In ensuring that the objective of the bumiputera economic transformation agenda achieves its goal, I would like to request an explanation from the Honourable Deputy Minister as to how far the KPIs set for the Chief Executive Officers of government-linked companies have succeeded in promoting bumiputera participation in government-linked companies, and how many bumiputera entrepreneurs have been produced, and I also want to know who are the figures or administrators who manage 1MDB. Thank you.

GLCs have certain reports on the achievements of bumiputera entrepreneurs. Last week, the G20 Group, namely the main GLCs, 20 groups, 20 major companies, prepared a complete 32-page report, and that report was published in the mainstream newspapers Berita Harian and also Utusan Malaysia, where we can read the 32-page report on the success of GLCs in developing bumiputera entrepreneurs. GLCs also issued certain reports such as the one I have in my hand, GLC Transformation Programme Progress Review 2014, with permission, and they also issued a report card, with permission, GLC Transformation Programme Report Card June 2014. In it, as an example relating to this bumiputera agenda, there is mention of the Bumiputera Empowerment Agenda (BEA), with permission. Among the matters recorded under it are that they have created 60,666 suppliers with a business value of RM75.1 billion, developed 88 vendors and 380 core companies, the majority of which are bumiputera. If you want more details than that, we can read what has been announced to the public, the 32 pages of their success in implementing the bumiputera agenda in business, which everyone can read.

The second question, 1MDB. Board of Directors - its Chairman, Tan Sri Dato' Seri Lodin Wok Kamaruddin; CEO, Mohd Hazem Abd. Rahman; Datuk Shahrol Azral Ibrahim Halmi, this is one of the Board of Directors members who was before the CEO; then another Board of Directors member, Tan Sri Dato' Paduka Ismee Ismail; another one is Tan Sri Dato' Ong Gim Huat; and another one, Tuan Ashvin J. Valiram. 1MDB also has an Advisory Board. Among its Advisory Board members, there are nine persons. I will read out the names one by one. Chairman: - Dato' Sri Mohd. Najib bin Tun Abdul Razak. Members are: - Tan Sri Dato' Nor Mohamed Yakob; - Tan Sri Dr. Ali Hamsa (Chief Secretary to the Government); - Tan Sri Dr. Mohd Irwan Siregar Abdullah (Secretary General of the Treasury, Ministry of Finance); - Tan Sri Mohd Sidek Hassan (Chairman of Petronas); and There are four persons from abroad, namely: - His Excellency Sheikh Hamad bin Jassim bin Jaber Al-Thani - former Prime Minister and Minister of Foreign Affairs of Qatar; - Mr. Bernard Arnault - Group Chairman and CEO of Louis Vuitton; - His Excellency Khaldoon Khalifa Al-Mubarak - Chairman of Abu Dhabi Executive Affairs Authority, CEO and Managing Director of Mubadala Development Company; and - Mr. Chang Zhenming - Chairman and President of China International Trust and Investment Corporation, City Group of China, which is a conglomerate that is the largest in China. That is 1MDB, Mr Speaker.

Dr. Azman bin IsmailPKR · PHKuala KedahEN

Thank you Mr Speaker. My question concerns GLCs. What is the need for GLCs, and how far and for how long does the government need GLCs? Is there no other mechanism to achieve the aspired objectives? Thank you.

Mr Speaker

Hubungan...

Terdapat...

Mr SpeakerEN

The proposal, Honourable Member, the relationship must be severed, sick.

There are 20 companies under the GLCs, that is one group, for the information of Honourable Members. There is another group, namely 44 Minister of Finance Incorporated companies. So one group is MKD, one group is GLC. Two different ones. These GLCs were previously called G20, which now has 17 groups remaining, and the other one I mentioned earlier is the MKD companies. What is interesting is that 1MDB is not included in the GLCs, and Petronas is not included in the G17 group. This is on the- however, all 17 plus 44 are under the Minister of Finance Incorporated. This will continue because the government from time to time makes large investments, and those investments are for infrastructure that no non-government company or company unrelated to the government is willing to take on because its investment is very high. For example, to implement the MRT, it requires tens of billions of ringgit, and to get returns back from the MRT takes tens of years.

For ordinary companies, it is not possible for them to have that capacity. We are concerned that when they are unable to, in the end the government has to bail out the related companies. One matter I would like to share here is who monitors the CEOs, this is additional information. First, we have a representative of MoF on the Board of Directors; second, we have the Government Investment Companies Division (Bahagian Syarikat Pelaburan Kerajaan) in the Ministry of Finance. One division has many officers who monitor. Then, they must submit reports to the government every quarter and annual reports to the government. Apart from that, they also have specific KPIs. There are two KPIs, one KPI for the CEO himself, and another for the companies they lead. Furthermore, from time to time, the Minister of Finance can summon them and ask about developments. In terms of accountability, I would like to share here as an example that the CEO of MRT resigned, Datuk Wira Azhar Abdul Hamid. He resigned because he took responsibility for the safety issue which resulted in, if I am not mistaken, three deaths during the MRT construction process. Although the Board of Directors rejected it, he has a high sense of accountability, and on 31 December this year he will officially resign. Thank you.

Dato’ Dr. Tan Kee KwongPKR · PRWangsa MajuEN

I ask for a supplementary question because this topic, 1MDB, is very controversial. May I ask the Honourable Deputy Minister?

Mr SpeakerEN

There has been enough raised over the past day or two on this matter, and there is also a motion brought by a Member of Parliament which I am currently considering whether to debate or not. If that is not enough yet, I will allow the Honourable Member.

Dato’ Dr. Tan Kee KwongPKR · PRWangsa MajuEN

Okay, good. Thank you Mr Speaker. Thank you, Deputy Minister...

Mr SpeakerEN

The Honourable Member has not yet answered me. Is that enough or not?

Dato’ Dr. Tan Kee KwongPKR · PRWangsa MajuEN

Not enough yet because...

Mr SpeakerEN

Not enough yet. Please, I want to hear the Honourable Member's argument, whether it is a supplementary question or just wasting time. Please.

Dato’ Dr. Tan Kee KwongPKR · PRWangsa MajuEN

Okay, thank you Mr Speaker. My intention is good because this concerns the country's finances. I would like to ask the Honourable Deputy Minister about this 1MDB matter. Recently, a friend of mine who has experience at the World Bank, Washington DC. His comment was- he said, "Brother, sovereign fund, no other sovereign fund in the world borrows money to invest at such a high interest rate." That was his comment, and I ask for an explanation from the Honourable Deputy Minister concerned. Thank you.

It seems there is no direct relevance to this matter. We have answered about this sovereign fund. The Honourable Member for Wangsa Maju may open the 1MDB website shortly and read in that website the answer on the sovereign fund, why the interest is high and so on. It cannot be compared with another Petronas bond, for example, which has a low interest. This is rather high because its maturity period takes a long time compared with the maturity period of other debts. That is among the matters taken into consideration when determining the tenure or interest imposed on any bond. The Honourable Member may read the detailed explanation. I have also asked 1MDB to respond openly to all the accusations and slanders thrown by various parties, especially the opposition against them. We also plan to bring two Honourable Members, namely the Honourable Member for Petaling Jaya Utara and the Honourable Member for Permatang Pauh, to the Rights and Freedoms Committee because they have misled the House on the facts stated about 1MDB. Not only will the Honourable Member for Pandan bring me to that Committee, but we will also bring the Honourable Member for Permatang Pauh and the Honourable Member for Petaling Jaya Utara to the Committee concerned. Then the method of fighting is correct.

Tan Seng GiawDAP · PRKepong · questionEN

2. Dr. Tan Seng Giaw [Kepong] asked the Minister of Women, Family and Community Development to state the number of women in all major sectors and its objectives. What facilities are provided for women workers who have children?

Datuk Hajah Azizah binti Datuk Seri Panglima Mohd. DunUMNO · BNDeputy Minister of Women, Family and Community Development · BeaufortEN

Thank you, the Honourable Member for Kepong and Mr Speaker. Under the Tenth Malaysia Plan between 2011 and 2015, the government set a target to increase women's participation in the labour force to 55 per cent by 2015. The government's various efforts to provide employment opportunities have borne fruit, as the number of women in the labour force increased from 4.17 million in 2010 to 5.15 million in 2013. The number of women employed over the same period also increased from 4.02 million persons in 2010 to 4.97 million persons in 2013. Based on the Labour Force Survey Report, Department of Statistics Malaysia in 2013, the percentage of women workers out of total workers for each category under the Malaysia Standard Classification of Occupations 2008 is as follows: | Occupational Category |Percentage (%)| |--------------------------------------------------------------------|------------:| | | | |Managers | 22.0| |Professionals | 55.4| |Technicians and associate professionals | 32.7| |Support and clerical workers | 72.9| |Service and sales workers | 48.4| |Skilled agricultural/forestry/fishery workers | 25.3| |Craft and related trades workers | 16.9| |Plant and machine operators and assemblers | 20.9| |Elementary occupations | 33.5|<END_TABLE_MARKER> According to the same report, a total of 2.92 million women worked in the private sector in 2013 compared with a total of 2.80 million women who worked in the private sector in 2012. This shows an increase in the number of women workers in the private sector of 4.4 per cent. Mr Speaker, specifically for the public sector, data from the Public Service Department shows that up to July 2014, the total number of women civil servants in the public service was 644,859 persons, or 55.4 per cent of all civil servants, compared with 2010 when the number of women civil servants was 554,986 persons or 53.4 per cent of all civil servants. At the management and professional level, up to July 2014, the number of women civil servants was 221,592 persons, or 63.1 per cent of all civil servants at management and professional level, compared with 166,931 persons or 60.9 per cent of all civil servants at management and professional level in 2010. Mr Speaker, facilities for women workers who have children. Childcare centres and nursery schools are an important support system that helps women with children remain in the job market. Up to August 2014, a total of 3,414 taska (child care centres) that have been opened have been registered with the Department of Social Welfare (JKM). Meanwhile, 565 daycare centres for children and 231 residential child care centres have also been registered with JKM. In addition, six OKU taska managed by NGOs have been established. To strengthen this support system, the government has implemented various initiatives to encourage employers and taska operators to provide these services. Among these initiatives are:

Datuk Hajah Azizah binti Datuk Seri Panglima Mohd. DunUMNO · BNDeputy Minister of Women, Family and Community Development · BeaufortEN

(i) allocation of a launch grant of RM200,000 to ministries or departments to set up taska at public sector workplaces; (ii) tax exemption of 10 per cent per year for private sector employers on the total cost of constructing or purchasing a building to set up a workplace taska for a period of 10 years; (iii) income tax exemption for a period of five years and industrial building allowance at a rate of 10 per cent per year for taska operators and private child care centres; (iv) incentives for private sector employers through double tax deduction on allowances or subsidies given to employees and maintenance expenses for taska and child care centre facilities; and (v) a specific PERMATA childcare subsidy of RM500 per caregiver. Mr Speaker, flexible work arrangement (FWA) or flexible work arrangements is a facility that can help women workers who have children. Under Budget 2014, employers were proposed to implement flexible work arrangements that provide flexibility in time, place and hours of being at the workplace. This scheme can be implemented in forms such as compressed work week, flexi hours and weekend work. To attract more Malaysian companies to implement flexible work arrangements, training expenses and consultancy fees borne by employers in implementing this scheme are given additional tax deductions under Budget 2014. In addition, the portal flexworklife.my, launched on 8 July 2013, in collaboration between the Department of Women's Development, TalentCorp Malaysia and MyStarJob, serves to display jobs based on flexi jobs, provides a repository of FWA best practices and family-friendly facilities for reference and use by companies, and provides a platform for applying for tax incentives for employers supporting the implementation of FWA. As at 30 October 2014, a total of 374 flexi jobs had been advertised by more than 80 employers, while the number of job applicants was 4,415. Thank you.

Dr. Tan Seng GiawDAP · PRKepongEN

Mr Chairman, supplementary question. Is the ministry willing to spend or contribute more money to create a better environment and conditions for women, especially at the management level? Is that excessive effort in the forthcoming Malaysia Plan?

Thank you, Honourable Member for Kepong, who is so very concerned about the plight of women and champions their cause. We, the government, are indeed very concerned about the development of women in our country, Malaysia, and that is why, as I mentioned just now, we aim to reach 55 per cent female participation in the labour force next year. To that end, we have provided a policy to establish taska (child-care centres) in the workplace.

That is a facility to enable women to continue working, because if there were no place to send their children, women who work would have to leave employment and stop working to look after their children and families. Therefore, next year too, we have allocated another RM10 million in the budget for taska under the National Key Result Area (NKRA). This is a government measure to ensure that many more taska can be set up, so that more women can work. Not only can they work, but they can also remain in employment. Flexi work is also a government effort introduced last year together with TalentCorp to ensure that working women can continue to work.

Women who have worked before have high levels of knowledge, expertise and experience. Those who have temporarily stopped working can return to work through this flexi work programme. This is a government effort that will also be continued in the Eleventh Malaysia Plan to come. InshaaAllah.

Puan Hajah Normala binti Abdul SamadUMNO · BNPasir GudangEN

Thank you, thank you, Mr Speaker, thank you, Honourable Minister. My supplementary question, following the lack of response from private companies, especially to set up nurseries in the workplace, is whether the ministry is prepared to develop a child-care centre within or near industrial and commercial areas to address the problem of women returning to work? Thank you.

Thank you, Honourable Member for Pasir Gudang. Firstly, Mr Speaker, I would like to inform you that there are already private sector parties cooperating in the government's efforts to ensure that women who work in the private sector also receive support, particularly so that their children have a place to be sent. So far, according to our data, we have 26 workplace taska in the private sector. We would like to thank them, the private bodies that have already set up taska at their workplaces. We take this opportunity to call on other departments or private bodies in our country to set up taska at their workplaces. I would like to inform you that so far, Proton has already done so, UniKL staff have already done so, Tenaga Nasional Berhad has already done so, Kolej Mara, Kajang Specialist Hospital, PLUS Malaysia Berhad, SIRIM, Citibank have already set them up, the Companies Commission of Malaysia, the Securities Commission, Sime Darby, TNB, Malayan Banking, Perbadanan Nasional Berhad, Telekom Malaysia Berhad, Felda Holdings, the MARA Professional College Cooperative, the USM Cooperative, Petronas, Tenaga Nasional, all of these have already established taska at the workplace. However, we want even more, and we also hope that those outside there, some who say that, as in industry, they say the place is not suitable for setting up taska at the workplace because it may be dangerous to children and so on. However, we can cooperate with them to set them up outside areas considered dangerous, so that women working in industry can also...

Puan Hajah Normala binti Abdul SamadUMNO · BNPasir GudangEN

Honourable Minister, may I- I, Mr Speaker...

Mr SpeakerEN

Let the Honourable Minister finish answering first, Honourable Member [Laughter]. The first question has not even been fully answered yet, and already there is another answer [Laughter]. Honourable Minister, please.

So that mothers or women who work in industry can also place their children in a safe, registered place, where they can work in good conditions, comfortably and without worry. Our ministry's task is to register and also to help train the carers at these taska, Mr Speaker.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

One more addition.

Mr SpeakerEN

Yes. The women's voice. Please.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Thank you, Mr Speaker. Honourable Minister, I think we have yet to, as people say, exhaust, with permission, the options we have to help working women. Has the ministry looked into the fact that it is not only taska that we need for placing children, since women cannot escape other responsibilities such as cooking and other household chores? In the past, the presence of domestic helpers was very helpful to women. So now, I would like to ask whether the Ministry of Women, Family and Community Development will explore or look for other ways to make it easier for women to hire domestic helpers. At present, if one wants to hire a domestic helper from abroad, it costs at least RM10,000.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Is the ministry aware that many young people hire domestic helpers, for example those from Indonesia who come to Malaysia, and then, after their visit period expires, they remain as illegal immigrants? To change their status to obtain a valid permit or visa, there is no way through the Immigration Department. So perhaps I suggest that we explore this with the Ministry of Home Affairs to give some relaxation to women who wish to hire domestic helpers and do not need to go through these agencies... [House in uproar] Yes, I would like to ask, are we exploring matters other than taska? I ask this because we will never end this problem. Thank you...

[Dewan riuh]

Mr SpeakerEN

Honourable Members, this is about women, and domestic helpers. If there were no domestic helpers, the menfolk would also grumble later [Laughter]. Honourable Minister, please.

Thank you, my friend from Kota Raja. Indeed, as women, we explore everything on how to achieve, especially the 55 per cent female participation in the workforce next year. We have to explore everything. So, thankfully, our ministry has held many discussions and consultations with various other relevant ministries, especially concerning this domestic helper issue. Our ministry, and the Honourable Minister too, has held discussions with the Honourable Minister of Human Resources, for example, to find ways in which we can provide facilities to our working women, as the Honourable Member just mentioned, that the problem we currently face is in obtaining domestic helpers. This is indeed in our planning and in our consultations. Thankfully, thank you, Honourable Member.

Tuan Shabudin bin YahayaUMNO · BNTasek GelugorEN

Honourable Minister, another question, Mr Speaker. Regarding...

Mr SpeakerEN

Honourable Member, do you want me to breach the Standing Orders? Three Honourable Members are already standing.

Tuan Shabudin bin YahayaUMNO · BNTasek GelugorEN

Okay, okay, okay.

Abdul Rahman bin MohamadUMNO · BNLipis · questionEN

3. Dato' Haji Abdul Rahman bin Mohamad [Lipis] asks the Prime Minister to state the efforts to upgrade the online examination system introduced by the Public Service Commission (SPA) to overcome the technical problems involving the server that candidates have experienced difficulty in answering the examination questions.

Datuk Joseph Entulu anak BelaunPRS · BNMinister in the Prime Minister's Department · SelangauEN

Thank you, Mr Speaker, thank you, Honourable Member for Lipis. Mr Speaker, I respectfully seek permission to answer today's question together with the oral question by the Honourable Member for Hulu Rajang on 17 November 2014, as it touches on the same issue, namely the online public service examination system. May I?

Mr SpeakerEN

Yes, please, Honourable Member.

Mr Speaker, for the information of Honourable Members, the government, through the Public Service Commission (SPA), introduced the online examination system starting 30 April 2014. This online examination aims to provide candidates with access to the examination system from any nearby location that has internet access, without having to go to the examination centres designated by SPA, which are usually only open in state capitals or big cities.

SPA made thorough preparations before implementing the online examination system. As a preparatory step, SPA conducted stress tests, or stress tests, on the application system, servers and the entire infrastructure of the system before its implementation. These tests are also carried out continuously. To date, a total of six stress tests on the application system and infrastructure have been carried out to assess the level of maturity of the application system and access. Next, ensuring that the application system and access are at the best possible level before examinations are conducted. Improvements are made from time to time based on the results of these stress tests. SPA also made improvements to the servers and firewall to ensure that candidates sitting the examinations can access them without any problems. The number of virtual servers has been increased to 70 virtual servers capable of accommodating up to 120,000 candidates. Infrastructure improvements to the online examination system have also been made, where all servers have been divided into six clusters, or groups, to ensure optimum server and application performance. Each cluster is installed with one virtual firewall to ensure security and facilitate candidates' access to the examination system. The configuration of the application and servers has been improved to enable the system to accommodate a large number of candidates. In addition, this system also provides redundancy for each virtual firewall to enable high availability, with permission, in handling high simultaneous access from candidates. At the same time, SPA has set up a special ICT technical team at the operations centre every time examination matters are conducted to ensure the examination process runs smoothly. SPA also set up a media and communications team while examination matters are ongoing to answer telephone calls and social media enquiries to assist candidates who make enquiries regarding the examination matters. SPA has also organised special online examination briefing sessions nationwide for candidates who will sit the examinations. These briefings provide guidance on the procedures and use of the online examination system application, as well as information on the computer facilities and suitable internet access that candidates need to prepare to sit this online examination smoothly. SPA does not deny that some problems arose during the early implementation of this online examination. However, as a result of continuous improvements, the SPA online examination has continued to improve. Most recently, three online examinations were conducted, namely the examination for Assistant Officer of Islamic Affairs Grade S27; Photographer Grade B17; and Administrative and Diplomatic Officer Grade M41, and these ran smoothly without any problems. A total of 46,516 candidates successfully sat the examination for the PTD scheme held recently on 1 November last. The examination results were also announced on 3 November through the SPA portal. That is all, thank you.

Thank you, Mr Speaker. I respectfully request to put a supplementary question to the Honourable Minister, although the Minister has answered very well. However, there are several issues I would like to raise. I very much welcome the transformation and changes of SPA in line with the aspirations we have today, and there are just a few matters that SPA should take into account, that the Minister should take into account, because this system can actually save a lot, about RM2.5 million a year according to the information. The thing we need to overcome in this matter is what problems can be resolved concerning residents in the interior, who usually do not have internet access, and it is understood that this examination question is answered from 8 p.m. until 11 p.m. Of course, in small towns such as in the Lipis parliamentary constituency itself, Mr Speaker, most of these cyber centres close at 8 p.m., and at 9 p.m. they are already closed. This is a problem for interior residents.

So, is the Minister planning to hold it during the day, even though we know that in principle the government wants to save time, save leave if people need leave, but in the matter of rural residents, this must also be taken into account. I think the Honourable Member for Hulu Rajang also questioned this, surely a similar question. I was also informed by...

Mr SpeakerEN

Honourable Member, sit down. I have often reminded that supplementary questions must be brief, not argumentative. Why are you mixing in that matter over there? Please, Honourable Member, be brief.

I just want to ask, most of these servers had some problems and candidates could not answer question 'B' recently. What is the government going to do to overcome this problem that has arisen? That is my question, Mr Speaker.

Mr SpeakerEN

Thank you. It would have been good if that were the question from the start. Honourable Minister, please.

Thank you, Mr Speaker, thank you, Honourable Member for Lipis, first, for supporting the SPA's efforts to undertake transformation. From my notes here, there are roughly three questions raised. First, regarding the server just now. That problem no longer exists because we have improved or made several additions and also changes to the server system. One of the changes we made is that we use a redundancy or photology system. I am not a technical person, but for any server that cannot accept such a large number of candidates to a particular server, another server will help, or if one server breaks down, another server will help, and it runs well. So now this issue no longer arises. Second, rural candidates. I think this is more perception and not the truth, because there are three pieces of evidence. Two empirical pieces of evidence which, in my view, prove that online examinations are for the benefit of everyone, whether candidates from cities or from rural areas. For example, if we look at the data, and I obtained this data before the complaint issue arose from the public, because I asked SPA to brief me, and a few days later, by coincidence, many people lodged complaints that rural areas could not sit the examination.

The empirical evidence I am referring to is, first, under the conventional system, where our officers go to certain centres carrying examination papers and act as examination invigilators there. In the peninsula previously, of the total number of people called to sit this examination, only 50 per cent actually attended on the day. In Sabah it was 54 per cent, in Sarawak 56 per cent. After this online examination system was created and implemented, in the peninsula, it rose from 50 per cent to 62 per cent. In Sabah it rose from 54 per cent to 68 per cent, in Sarawak from 56 per cent to 65 per cent. Everything went up. Why this increase can be attributed to it is because more candidates from rural areas attended, because in my view, the setting or access or accessibility for people in the cities, whether under the conventional system or the online system, is indeed a constant, roughly the same. But for rural people under the conventional system, I will take Sarawak as an example, regardless of where the candidate comes from, they must go to one of three designated places, whether they go to Miri or Sibu or Kuching, depending on which is nearest to that person. But for this online examination system, people in Limbang and people in Lawas do not need to go to Miri. I do not know about Bekenu, in Sibuti, is the Honourable Member for Sibuti here? Is there internet access? If there is, it means that person does not need to go to Bintulu. People from Kapit or upriver from Kapit do not need to go to Sibu if there is internet access in Kapit.

But under the conventional system, it could only be held in Sibu, Kuching and Miri. I think that is the reason this improvement has come about now that we have implemented the online examination system. Second, if we look at the detailed figures for Sabah and Sarawak, this supports even more what I explained earlier. Sarawak first. Remember, in Sarawak, under the conventional system it was only 56 per cent previously. Now that the online examination system has been implemented, Kuching has risen to 75.5 per cent; Bau - rural (67.9 per cent); Lundu (63.6 per cent); Kota Samarahan (76.6 per cent); Serian (83.1 per cent); Sri Aman (89.6 per cent); Sibu (75.1 per cent); Mukah (82.5 per cent); Sarikei (79.1 per cent); Kapit (82.5 per cent); Bintulu (72.1 per cent); Miri (74.1 per cent); Marudi (50 per cent); Limbang (81.2 per cent); Lawas (78.3 per cent); and Betong (75.8 per cent). What is important here is that, according to the records we obtained and what we detected from the operations room and the SPA movement room during the examinations, none was lower than 56 per cent in these rural areas. This clearly means that the implementation of this online system has been very effective in helping people in rural areas, but there may well be some in rural areas who do not have internet and who may not have gone to places with internet access. However, overall, the effect or impact of implementing this online examination system is very positive. Now, Mr Speaker, the problems that arose in July, if I am not mistaken, July, September, there were three occasions of such problems. We have made improvements and now there are no longer any problems in the online examination system. So, Honourable Member, I do not think I need to answer the other questions one by one. Thank you.

Mr SpeakerEN

Before I call the Honourable Member for Kota Bharu to ask a supplementary question, I want to make a serious comment. I want Honourable Members to show cooperation. It is now nearly one hour, and we have answered only two and a half questions. Time and again I have reminded you not to go round and round when asking supplementary questions, because Standing Order 24 does not allow it. If a Minister is answering, he should answer only the question that has been put. Do not bring in policies, because the fourth question is also important, the fifth question is important, the sixth question is important. Other ministries have also prepared questions. So if Honourable Members still do not understand this, that's fine. Under Standing Order 24(3), I can only allow three, and even that is at my discretion, if I feel the matter is important. However, there are Honourable Members who keep standing up and asking again. I cannot control Honourable Members if everyone does not cooperate. Please remember, this includes Ministers. If answering, specific to the question, do not bring in policy [Applause] Don't just applaud, because after this, Honourable Members will also be involved. I'm very serious on this. Please, Honourable Member for Kota Bharu. Concise, quick.

Dato' Takiyuddin bin HassanPAS · PNKota BharuEN

Thank you, Mr Speaker, thank you for the advice. My question is brief and precise. The Honourable Minister has given a fairly good answer, but it is clear that the online examination system still has not satisfied many parties. I want to ask directly, in other countries that practise this online exam system, they set up online exam centres, online examination centres. Does our government plan to set up such centres? Thank you.

Thank you, Honourable Member for Kota Bharu. Mr Speaker, a centralised system can be set up. Firstly, as in Singapore it is easy, the place is small. Secondly, internet access in our case is rather limited. In Sarawak, for example, in Malaysia, especially in Sarawak, our population is spread across many places and it is not really feasible. If it were placed in just one location, it would be better to go back to the conventional system and centralise it in three locations. In Sarawak, for example, in Kuching, Sibu and Miri. So, at present, we do not yet have a policy to do so. Thank you.

Mr SpeakerEN

If I were the Minister answering that, I would say that because the question requires a yes or no answer, I will just say no. Simple. So, please take note, Ministers, yes, I'm serious. And also to the officers who prepare those answers. This is not about policy questions.

Nik Mohamad Abduh bin Nik Abdul AzizPAS · GSBachok · questionEN

4. Tuan Nik Mohamad Abduh bin Nik Abdul Aziz [Pasir Mas] asked the Minister of Youth and Sports to state the steps to further expand programmes such as Digital Campus 2014 (DC 2014), which are seen as capable of increasing the interest of youth in competing in the technology industry.

Datuk Saravanan A/L MuruganMIC · BNDeputy Minister of Youth and Sports · TapahEN

Thank you, Mr Speaker. Before I answer this question, I would like to inform this august House that the Digital Campus 2014 programme, or DC 2014, is a programme organised by a private company, and the Honourable Minister of Youth and Sports only officiated at this programme; this is not a programme of the Ministry of Youth and Sports.

Datuk Saravanan A/L MuruganMIC · BNDeputy Minister of Youth and Sports · TapahEN

Mr Speaker, for the information of Honourable Members, this ministry always supports technology development programmes, especially those involving youth. The Digital Campus 2014 (DC 2014) programme is organised by a non-profit organisation, non-profit organization, with permission, namely Youth on Unity (Y.O.U), with the support of the Ministry of Youth and Sports (KBS) and the Ministry of Education Malaysia. The programme, held from 3 to 5 October 2014 at the Sunway Pyramid Convention Centre, is a platform where innovation, creativity, digital entertainment and education are brought together under one roof. This programme can expose youth to the creative and innovative industries through interactive and enjoyable educational activities. In addition, the government, through the Ministry of Science, Technology and Innovation (MOSTI) in particular, has implemented various programmes related to the creative industry to attract the interest of youth to get involved in the field of technology. Thank you.

Thank you, Mr Speaker, and thank you, Honourable Deputy Minister. I will try to summarise. Firstly, I fully support this programme even though it is a private sector programme and the government has also supported it. It is a very good link to connect our nation's youth with major players in the global industry in digital technology and robotics. Our issue is that our country has long been exposed to this industry, but our youth still cannot understand or direct their interest in this field. So my question briefly, I am worried it will become long. Does the ministry, does the government have a more integrated, long-term plan among three ministries, the Ministry of Education, the Ministry of Science, Technology and Innovation and the Ministry of Youth and Sports, so that the digital and robotics industry is truly attractive and exposed to our nation's youth so that they will venture into this field as a new source of the nation's economy. Thank you.

Mr Speaker, since the question concerns three ministries and involves policy, the ministry will study it in depth and provide a written answer. However, in terms of action taken by the Ministry of Youth and Sports through the IKBN Sepang Training Centre, the Ministry of Youth and Sports indeed provides early education in robotics programmes to ensure that the young generation keeps pace with the overall digital development of the programme. Thank you.

Tuan Anuar bin Abd. ManapUMNO · BNSekijangEN

Thank you, Mr Speaker. I would like to ask the ministry how the ministry helps NGOs and private companies that are interested in organising programmes that truly have a place in the hearts of young people, such as the Selawat Perdana Programme, IT Fair, Kursus Perkahwinan Perdana, My Kampung My Future and so on, and incorporating such programmes into the youth festival that we organise every year. Thank you.

Mr Speaker, as mentioned by the Honourable Member, the Ministry of Youth and Sports has always provided support and encouragement for programmes that will inspire youth.

The programmes mentioned by the Honourable Member are indeed covered in the Youth Festival Karnival Belia that we organise every year in Putrajaya. Thank you.

Abdul Ghapur bin SallehUMNO · BNKalabakan · questionEN

5. Datuk Seri Panglima Haji Abdul Ghapur bin Haji Salleh [Kalabakan] asked

(a) what are the latest efforts of the ministry in resolving the electricity supply problems that continue to plague the people of Sabah, especially in Tawau; and (b) what time frame has been set to resolve this problem.

Datuk Seri Panglima Dr. Maximus Johnity OngkiliPBS · BNMinister of Energy, Green Technology and Water · Kota MaruduEN

Thank you, Mr Speaker.

Mr SpeakerEN

If the Honourable Member for Kalabakan repeats that, I believe we'll be having teh tarik outside later.

I want to count, count and answer, but Mr Speaker has already said to keep it short, so there is no time to exchange pantun. Mr Speaker, for the information of the honourable House and the Honourable Member for Tawau, several actions have been implemented and planned for short-term and long-term periods to address the problem of electricity supply disruptions in Sabah, including in Tawau. Among the short-term mitigation measures are the transfer of power generating sets from Teluk Ewa to Sabah for the construction of the Kubota Power Station in Tawau, which began operations in July 2013. This was followed by the restoration of the Batu Sapi power generating set in Sandakan for an additional 20 megawatts and the transfer of an 8 megawatt mobile power generating set from Tanjung Aru to Labok, Sandakan. These measures have shown good results, as evidenced by the reduction in the System Average Interruption Duration Index (SAIDI) in Tawau, from 482.62 minutes per consumer per year in 2011 to 422.36 minutes, per customer per year in 2014. For the information of the Honourable Member, the Kimanis Power Station with a capacity of 285 megawatts has also begun operations, where three power generating units have been brought into service in stages. One, on 16 May this year with 95 megawatts, second, on 22 July with 95 megawatts, and most recently on 7 November with 95 megawatts. SESB's grid system has been further strengthened with the 100 megawatt SPR-owned generating set, which began service on 13 August 2014. In addition, the 10 megawatt biomass-based Cash Horse Power Station began service on 5 November last, as I launched last week. The increase in generating capacity will not only reduce electricity supply disruptions caused by capacity shortages, but also reduce disruptions caused by unscheduled shutdowns of power stations, because the operating margin at this time, as I mentioned earlier, is what can be described as moderately high, namely between 200 and 300 megawatts. Although SESB says this is only enough for two and a half years before the margin decreases further. Other generation projects in the planning after 2014 are the Tawau Green Energy Power Station (30 megawatts) based on geothermal resources at Apas Kiri, Tawau, which will begin operations in 2017, the Upper Padas Hydroelectric System (180 megawatts) in 2023, and a main gas-based power station with a capacity of 390 megawatts on the East Coast of Sabah, which will begin service in stages in 2019 and 2020. In addition, the electricity generation system to the East Coast of Sabah will continue to be strengthened by implementing other generation projects. In the Sandakan area, 90 megawatts, Tawau 85 megawatts and Lahad Datu 30 megawatts from 2016 to 2018.

For the short-term plan to overcome electricity supply disruptions, including in Tawau, SESB has been instructed to continue and optimise the reduction of electricity supply disruptions through the Preventive Maintenance Programme and the Scheduled Maintenance Programme. Through these programmes, SESB is required to inspect, maintain and test electrical equipment and the devices used. In addition, other preventive maintenance such as clearing of lines, transmission and distribution must be intensified, because disruptions caused by trees and animals getting caught can be reduced. SESB has also been instructed to replace electrical equipment that has become old, while the installation of lightning arresters should be prioritised so that disruptions caused by natural phenomena such as lightning strikes can be avoided.

Finally, in implementing efforts to improve the electricity supply system in the State of Sabah. The Federal Government has also approved a grant of RM2.3 billion from next year, 2015, to 2020, to implement electricity supply projects that have been identified in Sabah and Labuan, covering generation, transmission and finally distribution. The Cabinet has also approved a special project team to implement the identified projects with the RM2.3 billion grant. Thank you.

Mr SpeakerEN

Please, Honourable Member for Kalabakan, supplementary questions should not be delayed.

Mr Speaker, I am satisfied with the Minister's answer. So, I hope the promises are kept. Thank you.

Barisan Nasional always strives its best to ensure those promises are kept. What is important for Sabah is that, with the RM2.3 billion grant, a special task force will be established. At the same time, a Steering Committee will also be established, as well as a forum in which Honourable Members of Parliament in Sabah will also take part, together with a Monitoring Committee that will continue to operate.

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

Thank you. Honourable Minister, with such large allocations, will they be able to resolve the electricity disruptions in Sabah, especially including in Sandakan, Lahad Datu, and the interior. This is because today these electricity disruptions really are very saddening. Is there a guarantee that there will be no more disruptions after these allocations are realised in the future?

Mr Speaker, we are very confident that with the grant provided by the government, as well as the 285 megawatts and the 100 megawatt SPR that have begun service, the margin is, with permission, will be comfortable for about three years. The issue is the delivery or transmission part and, more importantly, at the district level of the area, namely at the distribution level. So our focus for the grant given is specifically more for the transmission part and also the distribution part. This is because at the distribution zone level, 75 per cent of the cable wires in Sabah are bay wire, not twisted together with a cover. That is the big problem, and among the focuses is replacing these with aerial bundle cable (ABC). The wires used by KKLW in extending the grid were indeed the wires needed. However, previously with less allocation, and with a tariff that had not been reviewed for almost 17 years, second class wire was used. Not even second class, but that is what was used at that time. Whereas in Peninsular Malaysia 90 per cent is all ABC. So with that, we hope disruptions can be reduced from the more than 500 expected this year, I am very confident that next three years we want to hit below 300 all around or 250 with the support of all Honourable Members in this House and Members of Parliament from Sabah. Thank you.

[Question No. 6 – Honourable Member Tuan Ramkarpal Singh A/L Karpal Singh (Bukit Gelugor) absent]

Noor Azmi bin GhazaliUMNO · BNBagan Serai · questionEN

7. Dr. Haji Noor Azmi bin Ghazali [Bagan Serai] asked the Minister of Finance to state how GST can improve the quality of life of low-income families and the benefits to small and medium enterprises (IKS), and what related experiences exist in other countries that have implemented GST.

Datuk Chua Tee YongMCA · BNDeputy Minister of Finance · LabisEN

Greetings of happiness and well-being. Thank you for the question from the Honourable Member for Bagan Serai. Mr Speaker, for the information of Honourable Members, the GST paid by consumers will be collected and will form part of Federal Government revenue. All revenue collected, including GST, will be used for national development purposes. Through the various programmes and projects implemented by the government, the people will receive various benefits that can improve the quality of family life. GST is a consumption tax, so it is also able to generate more stable revenue. This is proven by the fact that more than 160 countries have already implemented it. In fact, through the implementation of GST, for consumers, the government has also provided an additional one-off, with permission, assistance package of RM300 to recipients of the 1Malaysia People's Aid Scheme (SARA). There is also a reduction in the individual income tax rate of one to three percentage points. There is also a restructuring of individual income tax, where the maximum-rate chargeable income is raised from exceeding RM100,000 to exceeding RM400,000. In addition, with the restructuring of income tax, an estimated RM300,000 of individuals paying income tax will be exempted from the requirement to pay income tax. GST, which was implemented on 1 April 2015, will also become more transparent, where the public can contact the Customs Department on the toll-free line, 1-300-888-500, or check the GST portal, gst.custom.gov.my, to obtain confirmation on the status of a business, whether it is registered for GST and eligible to charge GST or not, in terms of traders, especially the IKS industry, particularly those involved in standard rated or zero rated business, with permission. In fact, GST is not a cost to businesses, because businesses that implement GST are entitled to claim back input tax from the government. In addition, the government also provides tax collection and tax refund based on the concept of self-policing and carried out electronically. The government has also provided various assistance packages to IKS, including financial assistance of RM150 million for the purchase of accounting software. The government has also announced a reduction of the tax deduction by 1 per cent, and for secretarial fees and tax filing that are given tax deductions, the limit is set at a maximum of RM5,000 for secretarial fees and a maximum of RM10,000 for tax filing. From the countries that have implemented GST, the experience we have observed is: (i) it is the best formula for increasing national revenue; (ii) it encourages economic sectors, particularly in export activities; (iii) consumers can understand a more transparent tax payment system; and (iv) leakages in the collection of national tax revenue can be reduced. This is because with the implementation of this GST, the government expects that the tax gap, with permission, will be reduced in the long term, and subsequently collection revenue will also be increased and this revenue can be channelled to national development. That is all, thank you.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Thank you, Mr Speaker. When GST is implemented, we acknowledge and accept that there will be some shock, some change and an increase in inflation. The government has already informed us of this, and this is expected inflation, with permission, and it is temporary. Like some people who want to undergo surgery, the doctor tells them that after the operation they must stay in the ward for one month, two weeks in the ICU for sedation, and two weeks in rehab. So it does not mean they cannot have the operation, so there is no need to panic about what we are saying today. So this is expected, what we are afraid of is unexpected inflation.

Mr SpeakerEN

Honourable Member, your question.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

[Laughter] Mr Speaker, my supplementary question is, what is the long-term effect of GST in the context of raising the level of national development, particularly the transformation to become a developed nation, and whether in the long term GST is able to increase the people's income. Thank you, Mr Speaker.

Datuk Chua Tee YongMCA · BNLabisEN

Thank you for the supplementary question raised. First, in terms of expected inflation, with permission, indeed with the implementation of GST, there is indeed an increase in the rate of inflation. This was also announced in Budget 2015 in the speech, where inflation is expected to be between 4 per cent and 5 per cent. However, what is important is that in the implementation of this GST, I wish to reiterate that with the implementation of GST in most countries that have implemented it, it can reduce the tax gap, where until now, with the existing regimes such as sales tax and service tax, many or it can be said businesses or companies that do not register, because until now we only have an estimated seven to 80,000 involved in sales tax and service tax. Therefore, with the addition of revenue, especially by reducing the tax gap, the government has additional income. This will certainly be channelled to development projects. Thank you.

Thank you, Mr Speaker, thank you, Deputy Minister, for mentioning IKS earlier. Although the law actually only requires IKS or companies whose revenue, with permission, is RM500,000 and above to charge GST, there are campaigns in the media saying that companies that do not register for GST and do not charge GST will be discriminated against by other companies. So my question to the Deputy Minister is, what action has the government taken to ensure that companies that are in fact not subject to or not legally obliged to charge GST are not pressured, forced or discriminated against by government departments or other companies into charging GST. Otherwise, they will not be given contracts or will not be given room to obtain business from companies and government departments. Thank you.

Datuk Chua Tee YongMCA · BNLabisEN

Thank you for the supplementary question. In fact, the sales value set at RM500,000, when compared with other countries such as our neighbours Thailand and also the Philippines, our sales value is higher. A sales value of RM500,000 is estimated to result in about 12 per cent to 13 per cent of the total number of traders who need to register. Indeed, in terms of the regulation or the sales value set, businesses with sales value of RM500,000 and above are mandatory, while businesses with RM500,000 and below register only voluntarily. Therefore, we have also instructed Customs officers that traders with a sales value of RM500,000 and below, when they register, we must also inform them that this registration is not mandatory. However, if the Honourable Member for Pandan also has information where there are traders who are being forced, we also hope that it can be forwarded to the Customs Department.

Datuk Chua Tee YongMCA · BNLabisEN

This is because we see this as a serious matter, where it is the decision of the trader whether to register or not if their sales value is RM500,000 and below. That is all, thank you.

Michael Jeyakumar DevarajPSM · PRSungai Siput · questionEN

8. Dr. Michael Jeyakumar Devaraj [Sungai Siput] asks the Minister of Natural Resources and Environment to state whether the Government of Malaysia and the Government of Indonesia accept the statement that a drop in ground water level is among the main causes of peat forest fires in Sumatera and Kalimantan. What concrete steps are being taken by both governments to raise the ground water level again?

Dato' Dr. James Dawot MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

Mr Speaker, for the information of the Honourable Member for Sungai Siput, the Ministry of Natural Resources and Environment is unable to give any view on the situation of the drop in ground water level in Sumatera and Kalimantan, Indonesia, because it is beyond the control of this ministry. However, it cannot be denied that in the dry season, the water level in peat soil shrinks, which causes it to be easily burnt. Peat soil fires can occur either through human activities or spontaneously or spontaneous burning. The Indonesian Government, through the Indonesian Action Plan for Tackling Cross-Border Haze Pollution, or the Indonesia Plan of Action (PoA) in Dealing with Transboundary Haze Pollution, has already implemented peat soil conservation programmes that are suitable for maintaining the water level at the surface of peat soil to prevent fires. In addition, the ministry, through the Department of Environment, has implemented several peat soil conservation programmes in Riau Province, Sumatera, Indonesia, through a memorandum of understanding (MoU) signed with the Indonesian Government in 2008. The purpose of implementing these programmes is to control the shrinkage of water in peat areas through the construction of barriers on peat canals or check dams, which at the same time can prevent peat soil fires during the hot and dry season. That is all, thank you.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

Thank you, Mr Speaker. I would like to know whether the Malaysian Government is also helping in this process to build dams to raise the ground water level again in the affected areas. This is because I understand that the affected areas in Kalimantan and Sumatera are very vast, and if Indonesia's neighbours from Malaysia and other countries can help in this, perhaps the haze problem can be controlled. So I want to know, are we taking part? How many hectares of our area are involved, where Malaysia is involved in this effort?

Dato' Dr. James Dawot MamitPBB · BNMambongEN

Thank you for the supplementary question. Mr Speaker, under the MoU signed in 2008, the Malaysian Government, or the Ministry of Natural Resources and Environment through the Department of Environment, has indeed cooperated with the Indonesian Government to build 'check dams' in Riau. The check dams there are to ensure that the water level in the peat soil is always maintained above the ground, not below it. This is the dry season. Therefore, although this MoU has already ended this year, a new MoU will be made with the Indonesian Government, and I myself also wish to go to Sumatera to study the peat areas there. Because of my research experience in Sarawak over three years, in peat soil, I am confident I can give many more recommendations and advice, whether to our government or to the ministry and to the Indonesian Government.

Dato' Dr. James Dawot MamitPBB · BNMambongEN

In terms of the land area in Indonesia where we have built these check dams, we do not look at the land area. We only build check dams, with the number we have built in Riau being more than 10 check dams that we have helped them build there. That is all, thank you.

Mr SpeakerEN

Thank you, Honourable Member. The question session for oral answers has ended. Today there is no torment for Honourable Members, especially the Honourable Member for Kinabatangan, because there is no motion under Standing Order 12(1). [Time for Questions for Oral Answer ended.]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 CommitteeBill

The Order Paper was read to resume consideration of the "Supply Bill 2015 and Development Estimates 2015 in the Committee of the Whole House". [Fourth Day] [The House sitting in Committee] [Mr Speaker chaired the Committee.]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 Committee — Head B.22 [Schedule] - Head P.22 [Development Estimates 2014] -Bill

Mr ChairmanEN

Minister of Rural and Regional Development, please continue your reply.

Datuk Alexander Nanta LinggiPBB · GPSDeputy Minister of Rural and Regional Development · KapitEN

Thank you, Mr Chairman. Good morning, greetings of peace and greetings of 1Malaysia. I am continuing from where I began yesterday. I stand to answer the questions raised by several Honourable Members who took part in the debate on the Supply Bill 2015 at committee stage relating to the Ministry of Rural and Regional Development (KKLW). [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) chaired the Committee.] As Honourable Members are aware, the Ministry of Rural and Regional Development was allocated a total of RM10.5 billion. For operating expenditure, RM5.982 billion was allocated. Meanwhile, the total allocation for development is RM4.525 billion.

Datuk Alexander Nanta LinggiPBB · GPSDeputy Minister of Rural and Regional Development · KapitEN

A summary of approvals for the Development Projects under the 4th Rolling Plan 2015, RMKe-10, of the Ministry of Rural and Regional Development, according to approvals by the Economic Planning Unit (EPU), is that RM4.52 billion has been given as the development ceiling in this year of 2015. This allocation is for financing 477 projects, namely 59 new projects and 418 continuing projects. Mr Chairman, the ministry is aware of, and gives close attention to, every issue raised by Members of this House relating to the constituencies and communities represented by each Honourable Member.

Datuk Bung Moktar bin RadenUMNO · BNKinabatanganEN

Can the Honourable Minister?

Baru, boleh.

Datuk Bung Moktar bin RadenUMNO · BNKinabatanganEN

Thank you, Mr Chairman. I see that the allocation for this KKLW Ministry is shrinking rather than increasing, whereas this ministry needs a large allocation to be distributed to rural areas. What is even more unfortunate is when, for example, a road is built. After a few years, this road has no allocation for maintenance. So eventually, this road becomes a dead road again. When it becomes a dead road, a new allocation must be requested. Existing roads should have an allocation for maintenance, like the Public Works Department (JKR), like other departments. So I ask the EPU, and the Ministry of Finance, to give an allocation to KKLW for the maintenance of roads so that roads built under KKLW that are damaged later can be repaired. Because if there is none, this road will become a dead road again, and our people will suffer a loss and our country will suffer a loss. Thank you.

Thank you, Honourable Member for Kinabatangan. The Ministry warmly welcomes the proposal or suggestion of the Honourable Member for Kinabatangan to the Ministry of Finance that the distribution of allocations, as mentioned by the Honourable Member for Kinabatangan, be distributed in the future to the Ministry of Rural and Regional Development so that the Ministry of Rural and Regional Development can continue maintenance and ensure the quality of roads, especially rural roads that are very much needed by the rural population. Thank you, Honourable Member for Kinabatangan. I shall continue. There are indeed many more infrastructure development projects planned by the ministry, such as rural electricity supply, rural clean water and treated water supply, rural roads, and village connecting roads. The ministry also pays attention to human capital development, entrepreneurship development among rural residents, rural economic capacity programmes, and many more matters relating to the welfare of rural communities in general, including community development programmes for the Orang Asli.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, so that you can manage your time, it would be good if this is finished before 1 o'clock, Honourable Member.

Thank you. I will try. Mr Chairman, allow me to answer on behalf of this KKLW Ministry, which has been debated by 32 Honourable Members during the debate relating to the issue of constituency infrastructure development. Mr Chairman, the government has never marginalised the people in rural areas. However, all Honourable Members must be aware that efforts to complete infrastructure facilities in rural areas are a continuous effort of the government and are implemented in stages and also subject to the allocation given. The Honourable Member for Tebrau, I request that the Ministry of Rural and Regional Development take note of the infrastructure projects in Parlimen Tebrau. For the information of the Honourable Member, the Ministry of Rural and Regional Development has taken note of the issues and problems raised by the Honourable Member for Tebrau.

Therefore, the ministry requests that the Honourable Member for Tebrau submit a list of the infrastructure projects required for consideration by the ministry. The Honourable Member for Lumut asked about the amount of allocation for rural water supply and the amount of allocation for rural electricity supply. For the information of the Honourable Member, for basic rural infrastructure in the state of Perak, RM11 million has been allocated for the Rural Water Supply Programme, and RM24.5 million for the Rural Electricity Supply Programme. On rural roads, the Honourable Member for Tenom requested that the implementation of village roads in the Tenom area be carried out under the Eleventh Malaysia Plan. For the information of the Honourable Member, the application for village roads in the Tenom area will be continued in 2015 in stages, based on priority to the villages as raised by the Honourable Member. Accordingly, the ministry requests the Honourable Member's cooperation to submit a complete application listing the villages involved to the ministry for further investigation by the ministry. Next, the Honourable Member for Kuala Krai also requested village roads in the Kuala Krai area.

For the Honourable Member's information, the ministry will do its best to continue implementing village roads in the Honourable Member's area. As the Honourable Member has informed us, the Honourable Member will submit a list of the village roads involved. The ministry is prepared to consider these projects in 2015 in stages. The Honourable Member for Jerlun has also requested that the implementation of projects be coordinated together with the state government, the Implementation Coordination Unit (ICU), the Public Works Department (JKR) in the Jerlun area, the Muda Agricultural Development Authority (MADA) and so on. For the information of the Honourable Member for Jerlun, in planning the implementation of rural road projects and village connecting roads (JPD), the ministry always involves the state government, JKR, ICU and so on. The lists of projects implemented are also lists of projects according to the state government's priorities. However, the ministry will ensure there is no duplication in the implementation of projects. The Honourable Member for Sibu next requested an allocation so that the road in Kampung Chuhu can be upgraded to prevent the road from being submerged during floods. For the information of the Honourable Member, it is a priority of this ministry to improve the living standards of rural communities, and the ministry takes seriously the problem raised by the Honourable Member for Sibu. Therefore, the ministry will instruct the Sarawak State Branch Department (PCN) and the Sarawak state JKR to carry out an investigation and obtain detailed costs for upgrading the road. The ministry will list the road as one of the projects in the Eleventh Malaysia Plan. However, it is subject to the approval of the Economic Planning Unit (EPU). The Honourable Member for Bintulu has stated that village roads in several longhouse areas in Bintulu are of poor quality, and that within less than a year the roads have been damaged. The Honourable Member also informed us that when applications for resurfacing are not approved, residents have to wait a long time to have the roads resurfaced. For the information of the Honourable Member, every application will go through the same process once approved by the ministry. Contractors are selected through a quotation process, and the contractors have been informed of the road specifications to be built. Factors of soil composition and type also need to be taken into account when road damage occurs, and new methods such as stabilizers may be applied to prevent and reduce road damage in future. Damaged roads can be maintained under the operating budget received every year.

Accordingly, the Honourable Member is requested to submit a list of village roads that are needed and that are damaged and require maintenance. However, this is related to what was suggested by the Honourable Member for Kinabatangan a short while ago. For this purpose, the allocation is quite limited. Therefore, we hope that the Honourable Member for Bintulu and the Honourable Member for Kinabatangan will help so that the ministry obtains more allocation for this purpose, namely road maintenance. Next, the Honourable Member for Lumut asked about the allocation approved for the Rural Roads Programme and roads in the state of Perak. For the information of the Honourable Member, the allocation approved for the Rural Roads Programme and Village Connecting Roads (JPD) in the state of Perak for 2015 is RM39.45 million. Next, the Honourable Member for Limbang requested that the Maritam, Telahak, Bong Abai, Pengkalan Rejab Road Project Phase 4 be continued for 2015. For the information of the Honourable Member for Limbang, the Maritam, Telahak and Bong Abai, Pengkalan Rejab Road Project Phase 4 is not listed in the 2015 projects. However, the application for implementing this project will be submitted to the EPU and the Prime Minister's Department (JPM) to be implemented in the Eleventh Malaysia Plan. However, its implementation is subject to the approval of the EPU and JPM. The position also depends on the current financial situation. The Honourable Member for Seputeh, meanwhile, raised the issue of village roads in Pitas, Kudat. That is far from the Seputeh constituency, yes. For the information of the Honourable Member for Seputeh, an investigation into the complaint about village roads in Pitas, Kudat has been carried out. The report on the investigation has been received by the Ministry of Rural and Regional Development (KKLW) and will be included in the priority list in 2015. However, because the cost of completing the entire road is too high, it has to be carried out in stages, and this effort is not solely the effort of the Honourable Member for Seputeh who raised this matter. Since, of course, the Honourable Member for the area, namely Kudat, has always been working on this too, the Honourable Member for Seputeh should not simply seek credibility for herself, yes. The Honourable Member for Seputeh also requested the ministry's explanation regarding rural road facilities connecting six villages in Pitas to the town centre and facilities. For the information of the Honourable Member, the ministry is very committed to improving infrastructure, especially rural roads throughout the state of Sabah, where RM122,226,250 was allocated for the Rural Roads Programme for 2014, and RM148,835,255 for 2015. For the questions raised, the ministry requests that the Honourable Member submit detailed information on the villages involved so that an investigation can be carried out before the projects are listed under the Eleventh Malaysia Plan.

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, the Honourable Member for Putatan, please rise, Honourable Member.

Thank you, Mr Chairman. I listened carefully to the Honourable Minister's reply regarding the allocation distributed to the states of Sabah and Sarawak. Although the list is very long, as read out by the Honourable Minister, why is it that none of the projects submitted to the EPU have been given an allocation? What is the real problem? Is it not important to implement them? This is because although the allocation is very large, why is it small for the states of Sabah and Sarawak? Honourable Minister, try to explain this to us, the people want to hear...

[Dewan riuh]

[Ketawa]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, why is it like that? Honourable Member, there is no need to say, "Try to give an answer", there is no need to say it like that, Honourable Member [Laughter]

Thank you, Mr Chairman. Mr Chairman, at my level I have no answer to that, because the question is better directed to the party that provides the allocation, that party. So the Ministry of Rural and Regional Development (KKLW) always applies to the Ministry of Finance for approval of all the projects listed by the Economic Planning Unit (EPU), that is how it is. So thank you to the Honourable Member for Putatan for raising this issue so that the party concerned also takes note of the needs of the people in the state of Sabah.

Datuk Raime UnggiUMNO · BNTenom

Tenom.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Tenom, please stand, Honourable Member.

Tenom?

Datuk Raime UnggiUMNO · BNTenom

Belakang.

Datuk Raime UnggiUMNO · BNTenomEN

Thank you, Mr Chairman. Thank you, Honourable Deputy Minister. I really hope that the Ministry of Rural and Regional Development will be given more focus in allocations. This is because we see that the need in the states of Sabah and Sarawak to upgrade this infrastructure is very important.

Datuk Raime UnggiUMNO · BNTenomEN

Regarding the issue answered by the Honourable Deputy Minister concerning road maintenance and rural road construction, I would like to give the ministry my view that the ministry needs to look at the methods for implementing maintenance projects as well as road construction so that these roads can be used over a long period. I give an example, Mr Chairman, the implementation of the upgrading and maintenance project for Kampung Bakuku Road, where the method used by the ministry was soil stabilizer, which I saw at first, I saw that this method was not very good when implemented in rural areas. With this method, the road was not even a year old before it was damaged. At first we saw it was quite acceptable, but because it could not withstand rainy weather, the condition of the road became worse. So, Mr Chairman, I would like to state to the ministry that it should look again at the methods by which road construction and road maintenance can be made more durable. If possible, soil stabilizer methods should not be used for any village roads. Try to find the best road, as I have seen, we already have the Public Works Ministry. We turf, the ministry only needs to state whether it is width or length. This is because it involves high costs. Thank you, Mr Chairman.

Thank you for giving your views and sharing information with the ministry. The ministry is always looking for ways for us to improve. How do we not only implement rural road construction projects, but also see how the roads last long and their quality can be used by the community. If we now know that the use of soil stabilizer may not be suitable because it is not durable, we must look for better products and better methods so that rural road construction can achieve higher quality. So, I will continue. Next, the Honourable Member for Sepang raised that the road too, the road in the Orang Asli village that is damaged is causing village residents difficulty in moving. The same story applies in rural areas throughout our country. For the information of the Honourable Member, every year KKLW also allocates funds and road maintenance for damaged roads under the operating expenditure. If the Honourable Member can submit an application to the ministry so that it can also be listed as a priority for 2015.

The Honourable Member for Paya Besar, meanwhile, requested that existing village roads be upgraded. For the information of the Honourable Member, under the implementation of village road or village connecting road projects, the scope of project implementation is from eight feet to 14 feet in width. If the Honourable Member intends to widen an existing road beyond the scope that has been set, the Honourable Member may apply under the Rural Roads Programme. Accordingly, the Honourable Member is requested to submit a complete application for those roads to be considered and brought up for approval by the EPU and JPM. Next, the Honourable Member for Kota Samarahan requested that the ministry continue implementing infrastructure projects, especially the construction and upgrading of rural roads in the Kota Samarahan area. For the information of the Honourable Member for Kota Samarahan, the ministry is committed to managing the implementation of infrastructure projects, especially the construction and upgrading of roads in rural areas. For the Honourable Member's applications for villages in Kota Samarahan, the ministry will continue to implement those projects based on the list of applications received specifically for the Honourable Member's area. For the information of the Honourable Member, the allocation approved for the state of Sarawak for 2015 for the construction and upgrading of roads totals RM277 million. Now, the Honourable Member for Langkawi requested an allocation for 2015 for rural road projects and JPD as well. Honourable Member for Langkawi, the ministry has taken into account and noted the problems raised by the Honourable Member. Accordingly, the Honourable Member is requested to also submit a complete list of roads to be upgraded for consideration by the ministry. The Honourable Member for Parit requested that roads leading to houses in the Parit Parliamentary constituency be given consideration. The ministry has noted the issue raised by the Honourable Member for Parit. Therefore, the ministry requests that the Honourable Member submit a list of these roads so that the ministry can first carry out a site survey. If they are found to meet the scope, the ministry will consider the application for implementation, subject also to our financial capacity. Lastly, regarding rural roads, is the application from the Honourable Member for Sibuti... [Interruption] Not the Honourable Member for Seputeh, that is over, namely requesting that the ministry continue implementing the project to upgrade village roads in the Sibuti Parliamentary constituency. Honourable Member, I am pleased to inform you that the ministry, through the Village Connecting Road programme, will continue the proposal to upgrade village roads in the Honourable Member's area based on the allocation distribution that has been approved. Now we move on to the topic of Rural Water Supply. Next, Honourable Members have touched on the water supply programme. For the information of Honourable Members, since 2010 until now, a total of RM5.39 billion has been allocated for the rural water supply programme, and 333,000 houses have received clean and treated water supply. The ministry will continue implementing the rural water supply programme throughout the country to ensure that residents in rural areas can enjoy a perfect water supply. For the rural water supply programme, we begin with the Honourable Member from Sik. He requested that the ministry give attention to the water supply restructuring plan prepared by the Darul Aman Water Company (SADA) to overcome water supply problems in areas such as Padang Terap, Sik, Nami, Gulau, including the KEDA plantation in Belatik, which faces the problem of low water pressure. For the information of the Honourable Member, the ministry has noted the water supply problems faced in the areas that the Honourable Member for Sik has mentioned. This application will be examined by the ministry and will be considered subject to the scope of the rural water supply programme implemented by the ministry and also subject to the approved allocation. The Honourable Member for Stampin also stated that several villages or longhouses in Serian that do not support the Barisan Nasional have not been supplied with water tanks, and at the same time, Kampung Padawan at Batu 7, which is located near the town, still has not received a water supply.

For the information of the Honourable Member for Stampin, the list of recipients of 1Malaysia Water Tanks supplied by this ministry is based on the list provided by the Sarawak State Government. For the information of the Honourable Member, the ICU JPM is also involved in the supply of 1Malaysia Water Tanks in Sarawak. However, this ministry will inform the Sarawak State Government of this matter so that appropriate action can be taken. For the information of the Honourable Member for Stampin as well, the Sarawak JKR has informed us that the Batu 7 area is now facing a low water pressure problem, which as a result means that some high areas cannot be supplied with water.

Accordingly, this ministry will investigate this matter and will consider implementing it in the future. However, its implementation depends on the priority list of the state water authority and the allocation approved by the government. Yes, Honourable Member for Stampin.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Thank you, Honourable Member. For the Honourable Member's information, Kampung Padawan, Batu 17 does not have a pipe connected to the main pipe near the main road. Thank you.

Yes, we have taken note. Thank you. Next, the Honourable Member for Sibu informed us about the lack of water in Kampung Rasan, Kampung Bunga Besar, Kampung Bunga Kecil and Kampung Sungai Pinang in the interior of Sibu. For the information of the Honourable Member, the government has allocated a total of RM5 million for the implementation of rural water supply in this area this year. However, until now the project has still not been implemented because of obstruction from local residents. The Honourable Member for Sibu must help, okay. Two dialogue sessions have been held with the village residents, but still no decision or agreement has been reached with some of the residents and landowners to allow water pipes to be connected and laid according to the alignment that has been identified. Accordingly, this ministry will try to obtain the agreement of the residents and landowners in this area so that this project can be implemented immediately and the residents of this area can enjoy clean and treated water supply. Help the Honourable Member for Sibu, okay. The Honourable Member for Jerlun also requested that the ministry review the need to upgrade the water supply system in rural areas, especially the needs or the list that has been submitted by the Darul Aman Water Company (SADA) to overcome problems such as low water pressure, replacement of old pipes and replacement of small pipes. For the information of the Honourable Member for Jerlun, basically the rural water supply programme implemented by the ministry is to provide access to clean and treated water supply to houses that still do not have this facility, through the connection of reticulation pipes. For the purpose of improving the water supply system in an area because of problems such as low water pressure or pipe replacement, the ministry is of the view that it is the responsibility of the state water authority. We can always cooperate with the state water authority. However, the ministry has noted the matter raised by the Honourable Member for Jerlun and will examine the existing methods to overcome water supply problems in the areas as mentioned by the Honourable Member for Jerlun. Next, the Honourable Member for Limbang suggested that the connection of urban and rural water supply from Simpang Ukong to Pekan Mendamit be implemented in 2015 because water shortages often occur during the dry season. For the information of the Honourable Member for Limbang, the ministry has noted this matter and will consider it for implementation in the upcoming Rural Water Supply (BALB) project. However, its implementation depends on the priority list of the state water authority and the allocation approved by the government.

Selain itu, pelaksanaannya juga adalah bergantung kepada kecukupan sumber air terawat sedia ada di kawasan tersebut. The Honourable Member for Langkawi also requested that the ministry reconsider the water supply project involving a village in the Pekan Kuah area because the villagers are still using river water. The Honourable Member for Langkawi, the ministry takes note of the need for clean and treated water supply in the village stated by the Honourable Member. The ministry will consider it based on the priority list of the state water authority and subject to the approved allocation. We recommend that the Honourable Member for Langkawi liaise with the state water authority on this matter. Next, the Honourable Member for Sibuti also requested that treated water supply be implemented in Kampung Batu 8 Lambir, Kampung Opak Bekenu and Kampung Muhibbah Ladang 3. For the information of the Honourable Member, the ministry takes note of the absence of water supply in the three villages concerned and will consider implementing it in the future. However, its implementation is also dependent on the priority list of the state water authority and the allocation approved by the government...

[Bangun]

So, on the matter of Sabah as well, we advise the Honourable Member for Sibuti to liaise with the state water authority to ensure it is listed in the state. Please.

Thank you, Mr Chairman. Honourable Deputy Minister, as the Honourable Deputy Minister said, it will come later. The "later" is uncertain as to the allocation for 2015. If possible, Mr Chairman, I suggest to the Honourable Deputy Minister, may I submit this list through the state government and have it considered for 2015? This is because this area has already been categorised as an urban area too. Thank you.

The answer is yes, please proceed. So before I move on to the next topic, the Honourable Member for Bintulu has raised the issue of the water supply problem in rural areas in the Bintulu area.

[Bangun]

Jadi... [Ketawa]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, the answer is the same, Honourable Member. I have noted the answer, all the same.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

How can it be the same?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Subject to allocation, submit a list, guided by the state priority list...

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

This, Mr Chairman...

Amazing, Mr Chairman, it's as if you can predict the answer. Very good.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

How can it be if the answer is also the same? This is really...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That is the answer from the Honourable Member's ministry.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

This is not acceptable. This we...

Soalan bocor.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Thank you, Mr Chairman, thank you, Honourable Deputy Minister, Bintulu's situation is different. There are pipes in Bintulu, but there is no water. This is a matter of workmanship or technical issue, we ask the ministry to resolve it. If it is not resolved, then we as politicians have to resolve it. Later it will be like the Honourable Member for Kapit too.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Our area also has pipes, but there is no water. This is the issue we want to resolve. This does not depend on how much the allocation is, but it is the implementation...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat...

Implementation.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

If there are pipes, there is hope, Honourable Member.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

There is indeed hope...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

If there are no pipes, there is no hope.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Bintulu's debate must have hope, of course.

[Speaking without using the microphone]

Thank you, Honourable Member for Bintulu. So since Kapit has been mentioned, I feel called upon as the Member of Parliament for Kapit. We do not have a water supply problem in Pekan Kapit now because in March 2013, a new water treatment plant costing RM3 million was completed, as well as the pipe connection cost of RM5 million that has been implemented. So now, the problem has decreased. However, we take note of what was raised by the Honourable Member for Bintulu regarding the problem of no water even though there are pipes in the Bintulu area, and also this project has not been fully completed. For the information of the Honourable Member for Bintulu, officers from the Ministry of Rural and Regional Development and I myself will go down to Bintulu on Monday, the 17th of the month, to visit the Bintulu area and also go directly to the Kampung Asap area in the Upper Rajang area. For the information of the Honourable Member for Bintulu...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Bintulu, please stand, Honourable Member.

[Ketawa] Lagi?

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Yes, thank you, Mr Chairman, thank you, Honourable Deputy Minister. If the ministry takes action, the people will indeed hear it, my area, Bintulu, the people hear it, lots of talk of thank you. But there must be results, do not go around in circles once and come back, it's the same too. This is also what makes us frustrated.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

If that's the case, Honourable Member, I would like to invite the Minister to come to my area.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Yes, but Mr Chairman's permission can be later, it's all right.

Honourable Member for Bintulu, please believe that we will be serious about this matter in order to overcome the problems in the Bintulu area. So, thank you, Honourable Member for Bintulu, for helping. Next... [Interjection] Enough. Enough, that's enough. Rural electricity supply, Mr Chairman. Honourable Members have also raised the issue of rural electricity supply. For the information of Honourable Members, the ministry is always trying to improve electricity supply coverage in all interior areas. The Honourable Member for Sibu has requested that electricity connection be made to Kampung Bunga Besar, Sibu. For the information of the Honourable Member, the electricity connection was approved in 2012. The project costing RM24.8 million and benefiting 268 houses will be completed on 15 December. Okay, Honourable Member for Sibu?

The Honourable Member for Tebrau also requested that the ministry provide electricity facilities to the Orang Asli village of Pasir Salam. The Honourable Member for Tebrau, the ministry takes note and will bring the Honourable Member's request and will ask Tenaga Nasional Berhad to conduct a site survey so that the electricity line connection works to Kampung Pasir Salam can be implemented in 2015. In addition, the ministry also takes note of the suggestions of Honourable Members regarding the need to install street lights in villages. The Honourable Member for Jerlun proposed that the installation of village street lights (LJK) be focused on villages that still do not have this LJK facility. For the information of the Honourable Member for Jerlun, the scope of LJK installation involves installing street lights on existing poles with a quantity not exceeding 30 units per village. The focus of LJK installation in 2015 will be on villages that have not yet been installed with LJK. Specifically for 2015, the state of Kedah has been allocated a quota of 4,500 LJK units to be installed. The list of villages to be installed with LJK will be finalised by the Kedah State Development Office according to the state government's priorities. Next, the Honourable Member for Sibu and the Honourable Member for Bintulu have requested that village street lights be installed immediately in the interior areas of Sarawak so that village residents fully benefit. For the information of Honourable Members, the ministry is aware that village street lights are a major need for rural communities to carry out activities at night. Accordingly, the installation of LJK in 2015 in the state of Sarawak will continue. In 2015, the ministry plans to install 6,300 LJK units throughout the state of Sarawak at an estimated cost of RM5 million. The installation works will be carried out by Sarawak Energy Berhad (SEB) and are scheduled to begin in February 2015 and are expected to be completed in December 2015.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Thank you, Mr Chairman, thank you, Honourable Deputy Minister. Thank you to the Honourable Deputy Minister, the ministry has allocated funds to install lights in villages or longhouses. I want to ask this question, does the government review its lights, its bulbs, can they be made a little brighter or not? This is because now there are places that have been installed, if we lose our shoes we also have difficulty seeing them. That must be reviewed again regarding the brightness, with permission, can it or not? Can or can't we review it again?

Tuan Julian Tan Kok PingDAP · PRStampinEN

Honourable Deputy Minister, with permission. There is a suggestion.

Is that the Honourable Member for Stampin?

Tuan Julian Tan Kok PingDAP · PRStampin

Ya. Cadangan.

I am the Honourable Member for Bintulu and the Honourable Member for Sibu, the Honourable Member for Stampin.

Tuan Julian Tan Kok PingDAP · PRStampinEN

A suggestion regarding the lights.

Okay, just a little.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Regarding those lights, I would like to suggest to the Minister that they use the LED type. Perhaps it will save costs and be brighter as requested.

Okay, we will see, with our recommendation of which is the best we will use. So, this is subject to us having to do a study, but that's true. I agree, there is no point in having lights if they are not bright. The distribution of the quantity of LJK installations will be finalised by the Ministry of Rural Development Sarawak (KPLB), namely regarding Sarawak just now, according to the state priority list.

If the Honourable Member for Bintulu wants a few units in Bintulu, please make a list and send it to the state government as well so that it is included in the list. If I look at it a little, it seems like he is feeling called upon.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

No, this is one word...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

No need to mention Bintulu.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

No need to mention Bintulu, one can also stand up. Thank you, Mr Chairman, thank you, Honourable Deputy Minister. But do not let us submit lists, later all the ordinary backbenchers' representatives will be queuing at the back, not prioritised, especially whenever they implement, they go and install in all the Ministers' areas first... [Interjection] This we have experienced many times. Ask this, we in Sarawak also have many, right? Our backbenchers are usually last priority. Do you agree or not, Mr Chairman?

Tuan Julian Tan Kok PingDAP · PRStampin

Pembangkang begitulah.

Pembangkang...

Okay, this is a serious matter and we will ensure that lists from Members of Parliament and representatives who put the people first should be given priority. Thank you, Honourable Member for Bintulu, for reminding the ministry on this matter. Next, the Honourable Member for Lumut requested that LJK installation be continued in the state of Perak in 2015. For the information of the Honourable Member for Lumut, LJK installation will be continued throughout the country in 2015, especially for the state of Perak. A total of 6,000 village street lights will be installed, also starting in February 2015, and the LJK installation works will be carried out by Tenaga Nasional Berhad (TNB) for Peninsular Malaysia. The Honourable Member for Paya Besar also requested that LJK installation take into account the actual need for street lights in districts and villages. For the information of the Honourable Member for Paya Besar, the list of LJK installations in each state in Peninsular Malaysia is finalised by the State Development Office ICU and also the Prime Minister's Department (JPM) after taking into account the state government's planning at the district level. For the states of Sabah and Sarawak, the installation list is finalised by the Ministry of Rural Development Sabah and also KPLB in Sarawak. Accordingly, I would like to inform the Honourable Member that indeed all LJK lists that have been installed have been scrutinised and agreed by the state government. This is important, the state government. The Honourable Member for Gerik requested that LJK be installed taking into account the needs and views of the village head and district office, and that LJK maintenance works be taken seriously so that all LJK function and benefit village residents. For the Honourable Member for Gerik, all LJK installation locations in villages are determined by the village head or the district office.

Before starting LJK installation, TNB will refer to leaders at village level. For the information of the Honourable Member for Grik as well, all LJK installed will become TNB assets and the operating and maintenance costs of LJK are funded by the government on an ongoing basis. If there is damage to LJK, the ministry requests that the Village Head or village residents contact the number 15454 for Peninsular Malaysia, for repair action by TNB within three days. The Honourable Member for Kuala Selangor and the Honourable Member for Pasir Gudang requested that LJK installation be expedited and that installation locations be referred to the Office of the Member of Parliament first. For the information of the Honourable Member, the list of LJK installations is coordinated by the State Development Office ICU, JPM as I mentioned earlier, which takes into account the state government's priority list and local political leaders. The views of the Member of Parliament and State Assemblyman will be obtained before LJK installation is carried out.

The Honourable Member for Sibuti requested that LJK installation in villages be intensified to benefit all village residents. For the information of the Honourable Member for Sibuti, the ministry takes note of the suggestion of the Honourable Member for Sibuti and will ensure that villages eligible for LJK facilities are provided in 2015. Debate, LJK. Desa Lestari issue. The Honourable Member for Lenggong requested KKLW to focus on Kampung Desa Lestari. For the information of the Honourable Member, the allocation for Desa Lestari in 2015 amounts to RM26 million. A total of 13 Desa Lestari villages will be developed in 2015. Apart from economic development projects, KKLW also implements support programmes such as training, leadership, entrepreneurship and rural product promotion programmes. So before I stray too far, I would like to return slightly to the suggestion of the Honourable Member for Stampin. So, the Honourable Member for Stampin, the LJK specification is in line with his requirement of 70 watts set by Sarawak Energy Berhad. Therefore, the suggestion is for brighter installation. So, the issue of Perumahan Bantuan Rakyat (PBR). The Honourable Member for Jerantut requested the total number of new construction and refurbishment projects throughout the country, especially in the Jerantut Parliamentary constituency. For the information of the Honourable Member, during the Tenth Malaysia Plan period until October 2014, a total of 52,228 housing units have been built or refurbished throughout the country. Of this amount, a total of 2,490 units have been built or refurbished in the state of Pahang. Meanwhile, for the Jerantut Parliamentary constituency, a total of 225 housing units have been built and refurbished at a cost of RM3.3 million. The issue of the Orang Asli community. Mr Chairman, the next issue that arises is the issue of the Orang Asli community. The Honourable Member for Gerik requested an explanation on the measures to overcome student dropout among the Orang Asli. For the information of the Honourable Member, the ministry through the Department of Orang Asli Development (JAKOA) has implemented various measures to overcome the dropout problem by holding various programmes and educational incentive assistance schemes as follows: (i) provision of transport facilities to school funded by JAKOA; (ii) provision of pocket money incentives to secondary school students at the rate of RM2 per student per day; (iii) payment of school fees; (iv) holding courses and seminars on mindset change for parents and students; (v) the Orang Asli and Indigenous Adult Class Programme (KEDAP) for Orang Asli parents to create awareness of the importance of education; and (vi) building special hostels for secondary school students, especially in districts lacking hostels. For the information of the Honourable Member, the department's responsibility is only to provide student welfare matters. Matters relating to academic achievement levels are the responsibility of the Ministry of Education Malaysia. The Honourable Member for Kapar touched on the planned allocation of RM46.43 million in 2015. For the information of the Honourable Member, the ministry will implement programmes focusing on improving the standard of living of the Orang Asli. The allocation of RM46.43 million will be divided into programmes as follows: (i) Quality of Life Programme amounting to RM20 million; (ii) Tok Batin Allowance Programme, Orang Asli JKKK amounting to RM5.76 million;

(iii) Patient Aid Financing Programme amounting to RM4.76 million; and (iv) Human Capital Enhancement Programme amounting to RM15.9 million. Next, the Honourable Member for Pasir Gudang also raised the Orang Asli Human Capital Programme. For the information of the Honourable Member, JAKOA (Department of Orang Asli Development) has implemented Human Capital programmes, among them: (i) a KEDAP programme providing Kelas Dewasa Asli Peribumi (Indigenous Adult Classes) for Orang Asli parents, to raise educational awareness among them; (ii) organising various courses and mind seminars for community leaders, parents, youth, young women and school students; (iii) the Program Latihan Kemahiran dan Kerjaya (PLKK) (Skills and Career Training Programme), enabling youth and young women to take short-, medium- and long-term training courses, including SKM 1 and SKM 2 skills certificates, so that they keep pace with the job market; (iv) the Pusat Intelek Pelajar Orang Asli (PIPOA) (Orang Asli Student Intellectual Centre), which produces Orang Asli students who excel academically and in character; and (v) the JAKOA Paya Bukur Training Centre, which produces highly skilled garment-making trainees for the purpose of gaining employment and opening their own market. The Honourable Member for Gerik raised the need for roads in Orang Asli villages in the Gerik Parliamentary constituency and also raised the problem of treated water supply. For the information of the Honourable Member for Gerik, JAKOA has actively implemented basic infrastructure projects in Orang Asli villages from 2012 until now, including the provision of village road facilities. The ministry aims to resolve problems relating to basic facilities in Orang Asli villages by the end of 2017. The Honourable Member's request will be given due consideration in the implementation of the 2015 projects, as there is an application proposed by the Honourable Member. Regarding the treated water supply problem that was raised, JAKOA has identified the problem faced, and efforts to address the problem are being undertaken and resolved. The Honourable Member for Parit requested consideration for the construction of PBR (Projek Bantuan Rumah, Housing Assistance Project) houses in Orang Asli villages in the Parit Parliamentary constituency. For the information of the Honourable Member for Parit, the Honourable Member's request will be considered in the implementation for 2015. JAKOA will identify the applicants involved and will give priority to the poor and the hardcore poor who have families and are in dire need. The Honourable Member for Batu Gajah asked about the number of management and professional officers and implementers among Orang Asli in the public service.

For the information of the Honourable Member, based on EIS data from the HRMIS database, as of 11 April 2014, prepared by the Database and Information Management Sector, Information Management Division, Public Service Department, the number of management and professional officers among Orang Asli in the public service is 107 persons, while the implementer group numbers 1,469 persons. The Honourable Member for Batu Gajah also asked about the granting of land to Orang Asli communities under the Tenth Malaysia Plan. For the information of the Honourable Member, JAKOA does not have the power to grant land ownership because the administration of land falls under the jurisdiction of the state government.

However, Orang Asli rights to land have been clarified through the gazettement of Orang Asli land under sections 6 and 7 of the Akta Orang Asli and under section 62 of the Kanun Tanah Negara, through collective land ownership. To date, a total of 31,480.4 hectares of land has been gazetted for the use of Orang Asli communities. The Honourable Member for Batu Gajah also raised the measures taken by the government to improve the economy of the Orang Asli and to expand infrastructure in Orang Asli villages. For the information of the Honourable Member, JAKOA has already implemented integrated development in Orang Asli villages through settlement under the Rancangan Perkumpulan Semula (RPS) (Regrouping Scheme), combining basic infrastructure development with viable economic development projects. Programmes such as this have continued to the present and have been improved. It is the ministry's KKLW (Ministry of Rural and Regional Development) intention to ensure that this integrated programme is implemented successfully and brings great benefit to Orang Asli communities. The Honourable Member for Paya Besar asked about the number of Orang Asli graduates. For the information of the Honourable Member, for local study from 2006 to 2013, there were 270 students in matriculation/certificate, 730 students in diploma and 507 students in bachelor's degree. Meanwhile, for overseas study under degree programmes, there were 11 bachelor's, nine master's and two PhD students. From 2006 to 2013, a total of 1,507 Orang Asli students were offered places to pursue higher education locally. Meanwhile, a total of 22 Orang Asli students pursued education overseas from 2011 to 2013 within three years. These students pursued studies at various levels, namely certificate, diploma, master's and PhD. The Honourable Member for Paya Besar requested that the government reorganise Orang Asli villages in the Paya Besar Parliamentary constituency as model villages. For the information of the Honourable Member, JAKOA takes the proposal of the Honourable Member on the reorganisation of Orang Asli villages in the Paya Besar Parliamentary constituency very seriously. However, JAKOA must view this matter in a broader context. Overall, Orang Asli villages must be developed, including the Orang Asli villages in the Paya Besar Parliamentary constituency. So, nothing will be left out. The Honourable Member for Sepang stated that deaths have occurred in Orang Asli villages but transport facilities for this problem are not very satisfactory. Yes, Honourable Member for Sepang?

[Bangun]

Wait a moment, wait. I haven't finished. For the information of the Honourable Member for Sepang, JAKOA always prioritises the welfare of the Orang Asli. This is one of the functions of this department through the Orang Asli Training and Welfare Section. JAKOA also assists the Ministry of Health in facilitating Orang Asli health matters through logistical support such as transport and transit houses. JAKOA acts according to needs and will always be ready at any time to meet any requirements and improve services from time to time. Please.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you, Mr Chairman, thank you, Honourable Deputy Minister. Honourable Deputy Minister, my question is more specific. I am referring to the specific Orang Asli village of Kampung Banjar. In that village, it is quite far to go to the clinic and so on. So I propose that, if there is none yet, and what I know is they say there is none anymore, a mobile clinic be provided on a regular basis, perhaps once every two weeks or once a week, to provide health services to the residents there. I mention the name of the village, Honourable Deputy Minister. I ask that the Honourable Deputy Minister perhaps contact the officers to investigate this matter, as the road leading to that village is indeed very poor. So, I ask that the Honourable Deputy Minister take action. I also asked about my not being allowed to enter Orang Asli villages to give qurban meat. So I ask the Honourable Deputy Minister to answer this as well.

Thank you, Honourable Member for Sepang. The officer is in the House and has taken note of what the Honourable Member for Sepang has just said.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

A written reply would also be fine. A written reply would also be fine.

Yes, okay. We will convey the explanation in writing. The Honourable Member for Sepang also stated that Kampung Bukit Raja is very poor in terms of road standard. For the information of the Honourable Member, the Orang Asli village of Bukit Raja is a village involved in a negotiation process between the village residents and the Selangor State Development Corporation, where this settlement has been proposed to be relocated to an area suitable to the wishes of the residents. The Honourable Member for Sepang also stated that leaders were prevented from carrying out programmes in Orang Asli villages. For the information of the Honourable Member, JAKOA always encourages every government agency, politician, private sector and NGO to hold programmes that...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

That's BN politicians, Pakatan...

Can benefit the development of the Orang Asli. However, permission to carry out this programme in Orang Asli settlements must be obtained from JAKOA, because JAKOA needs to know...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

He knows, he knows, Honourable Deputy Minister. He knows. For the information of the Honourable Deputy Minister, the cows have already arrived. The cows are already in that village. When we want to slaughter them, we cannot. It is not allowed. So I want to say, Honourable Deputy Minister, please investigate this matter, and I hope the Honourable Deputy Minister will intervene so that this does not happen, because the Orang Asli are also our citizens. So we hope that political matters, these restrictions, must be removed. This is an old era. I ask the Honourable Deputy Minister to...

Does Sepang have Orang Asli?

That's the key, Honourable Member for Sepang, politics must be removed. If one goes into the village to help the Orang Asli, I think JAKOA has no problem.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Please help, Honourable Deputy Minister. That is why I say we should bring cows. We want to help give these cows to the Orang Asli.

But the words from the Honourable Member himself, politics must be removed. Entering to help the Orang Asli, JAKOA...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

It is not that politics must be removed. Politics of obstruction, politics of discrimination, must be removed. Not politics. The Honourable Deputy Minister must understand that term.

Okay, understood. Thank you, Honourable Member for Sepang. We will take note.

Puan Teresa Kok Suh SimDAP · PHSeputeh

[Bangun]

The Honourable Member for Seputeh has no Orang Asli.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Honourable Deputy Minister, please give a reply on that investigation. The party investigating the matter, please give me the answer later.

The answer is in the Hansard.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

No, I mean the restriction. The Honourable Deputy Minister may ask the Department of Orang Asli Development why it happened, and then inform me. Can? Thank you.

Yes. Thank you. The Honourable Member for Pasir Gudang informed that there is an unresolved land problem in Orang Asli villages in the Pasir Gudang Parliamentary constituency which has been taken by developers. For the information of the Honourable Member, JAKOA will always act as a facilitator to resolve Orang Asli land issues through negotiation with the state authorities, and the power over land administration is the power of the state government, Honourable Member for Pasir Gudang.

The Honourable Member for Seputeh stated that JAKOA gives assistance only to Orang Asli who are Muslim. For the information of the Honourable Member for Seputeh, JAKOA provides assistance to all Orang Asli who need it, according to needs and the available allocations, without discriminating on the basis of religious belief. Clear, yes.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I would like to interject.

Okey, duduk.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Yes, Honourable Deputy Minister, you may...

Tuan...

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Could you please investigate what was broadcast on Al-Jazeera, which shows that if Orang Asli do not embrace Islam, their houses are not as good compared with those who have already embraced Islam. This is not what I am saying, this happened in Pahang. This is what I received from the Al-Jazeera programme.

Okay, we will take note of it.

Honourable Minister, Mr Chairman...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Jerantut.

Jerantut. Thank you, Honourable Mr Chairman. As a Pahang person representing Pahang and the Jerantut Parliamentary constituency, there are indeed many Orang Asli settlements. What the Honourable Member for Seputeh said, if there is a Minister, perhaps it is an isolated case. I challenge the Honourable Member for Seputeh, please come to Jerantut to see for yourself. There is indeed no discrimination on religion, whether for Muslims or non-Muslims. Do not just make accusations. That is all, Honourable Minister.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I am not accusing any party, but this is what was broadcast in an international TV programme. So, I think this is...

This is not right, Mr Chairman.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

It is very important for the government to conduct an investigation. Later, I will convey this programme to the Honourable Deputy Minister.

The Honourable Member for Jerantut was not asking the Honourable Member for Seputeh.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Yes, do not let him challenge me. I do not need to be challenged. I am only showing it and asking the government to investigate.

Okay, we will take note, yes. The issue of the Rural Transformation Centre (RTC). Mr Chairman, next, the issue of RTCs in rural areas is raised. The question raised by the Honourable Member for Kuala Selangor concerns the proposal to establish an RTC in Kuala Selangor. For the information of the Honourable Member, so far the Ministry of Rural and Regional Development (KKLW) has not received any suitable proposed RTC location from the state government and the Economic Planning Unit (EPU) for the implementation of the Selangor RTC, yes. The ministry leading the RTC will carry out an assessment and visit the proposed locations that have the potential to be made into an RTC before a decision is made.

Therefore, the ministry will consider the Honourable Member's proposal if a suitable development location can be identified and it is in a strategic area to benefit rural residents in that state. The Honourable Member for Jerantut also proposed establishing an RTC in Kuala Tahan, Jerantut, Pahang. For the information of the Honourable Member, at present the ministry's policy is one RTC in each state in Peninsular Malaysia, two RTCs in Sarawak and two RTCs in Sabah. For the state of Pahang, the RTC that has been operating is at Kuala Pahang, Pekan. This RTC will benefit residents within a 100-kilometre radius from the RTC centre. The Ministry of Rural and Regional Development (KKLW) is in the process of strengthening this RTC to benefit all residents in the state of Pahang. The proposal of the Honourable Member for Jerantut is very good and will be considered in the 2016 plan, the forthcoming Eleventh Malaysia Plan. The Honourable Member for Lenggong stated that the mini RTC is a good programme and it is hoped that a mini RTC can be built in the Lenggong area, with the proposed site at the former fish processing centre that is no longer active in that area. For the information of the Honourable Member, the transformation of Medan Infodesa (MID) into a mini RTC has added to its original functions as a village internet centre, which aimed to bridge the digital divide between urban and rural areas, into a programme that improves the socio-economic standard of living of the local community. The mini RTC now serves as a one-stop centre for various services for the convenience of rural residents through eight initiatives, including ICT training, village skills training, collaboration with government and private agencies, 1Malaysia information kiosks, registered bank agents, cyber cafes, volunteer programmes and an IKS population collection centre. Under the Tenth Malaysia Plan, the ministry has not been allocated funds for building new mini RTCs and will instead focus on initiatives to strengthen existing mini RTCs to improve the socio-economy of rural residents and, at the same time, make rural areas productive, progressive and competitive. The Honourable Member for Kapar raised the planning of mini RTCs in 2015. For the information of the Honourable Member, the mini RTC, formerly known as Medan Infodesa as mentioned earlier, plans to carry out various activities in line with the aim of its establishment. The issue relating to KEMAS. The Honourable Member for Jerantut, the Honourable Member for Paya Besar, the Honourable Member for Jerlun and the Honourable Member for Sepang raised matters concerning career advancement remuneration, the status of KEMAS contract staff and the shortage of KEMAS staff. For the information of the Honourable Member for Jerantut and the other Honourable Members who touched on the same matter, KEMAS contract staff receive the same remuneration as permanent KEMAS staff. This includes the public service permanent allowances, fixed housing allowance, cost-of-living assistance according to grade, post and place of posting respectively. For the information of the Honourable Member for Paya Besar, the KEMAS management always strives to assist KEMAS Tabika and Taska teachers in improving professionalism and career advancement. In this regard, KEMAS management has sent KEMAS teachers who are not qualified for a diploma to attend Teaching Certificate courses at KOPEDA College, Shah Alam, Selangor since 2013. In addition, KEMAS management has sent KEMAS teachers who are eligible to take diploma programmes at Universiti Pendidikan Sultan Idris, Institut Perguruan Malaysia and Kolej Ketengah. Up to now, a total of...

Datuk Shabudin bin YahayaUMNO · BNTasek GelugorEN

Honourable Minister...

1,876 KEMAS teachers...

Datuk Shabudin bin YahayaUMNO · BNTasek GelugorEN

Honourable Minister...

Have obtained diplomas, while another 1,510 are currently pursuing diploma studies at those institutions. KEMAS management also provides in-service courses for KEMAS teachers to attend in order to enhance their career capabilities.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, the Honourable Member for Tasek Gelugor rises.

Datuk Shabudin bin YahayaUMNO · BNTasek GelugorEN

Honourable Minister, I would like to seek clarification from the Honourable Minister regarding the courses that have been provided to community developers. Previously, KKLW or KEMAS offered courses conducted through a joint venture with several universities for the teachers concerned to obtain diplomas, and they paid all the course costs themselves. But I want to know whether the teachers concerned have been absorbed into permanent posts with diploma salary grades, because they say that previously they were not admitted into the relevant scheme. Thank you.

With regard to the further clarification of what the Honourable Member raised just now, we will provide a written explanation, but there is also an explanation here, yes, as I have not yet finished. For the information of the Honourable Member for Sepang, the management of the Community Development Department (KEMAS) is in the process of applying for an upgrade of the grades of KEMAS contract staff through a reorganisation, a restructuring of the KEMAS structure. This application has been submitted to the Public Service Department (JPA). The matter is being considered by the government, yes.

For the information of the Honourable Member for Sepang as well, the recruitment of KEMAS staff is carried out from time to time based on the allocations provided. As of now, a total of 17,251 KEMAS contract staff and 884 permanent staff are serving with KEMAS. KEMAS is also training 344 community development officers for kindergartens and childcare centres to fill the shortage of KEMAS kindergarten and childcare teachers. KEMAS is also advertising community development officer positions across various disciplines to fill staff shortages in the Parliamentary constituencies and State Legislative Assembly constituencies throughout Malaysia. The Honourable Member for Stampin, the Honourable Member for Tenom and the Honourable Member for Kota Samarahan raised the matter of dilapidated KEMAS kindergartens. The delay in the construction of the KEMAS kindergarten in Tenom and the construction of the KEMAS Training Centre in Kota Samarahan. For the information of the Honourable Member for Stampin, KEMAS understands that there are many dilapidated kindergartens and childcare centres that require maintenance, and similarly almost all KEMAS buildings across the country require the same maintenance. However, annual maintenance is carried out based on the allocations approved for the current year. For example, for the year 2015, only RM2.5 million was provided to maintain 60 kindergartens and childcare centres under the development allocation, and RM5.5 million for 187 kindergarten and childcare maintenance projects under the operating allocation. Given this shortage of allocation, the projects to be maintained will be selected based on urgent need and priority. For the application from the Honourable Member for Stampin, KEMAS will carry out a review and justification to be forwarded to obtain allocation from the central agency if it is badly needed. For the information of the Honourable Member for Tenom, the construction of the KEMAS Kindergarten at Kampung Melalap, Tenom is being carried out by the Federal Land Consolidation and Rehabilitation Authority (FELCRA). The procurement process for building the Kampung Melalap, Tenom kindergarten has been carried out since the beginning of this year. However, it was delayed because the proposed construction cost exceeded the ceiling or ceiling limit, which is RM600,000. So the ceiling limit is RM450,000. The construction work for the KEMAS kindergarten is expected to be awarded at the end of this month. For the information of the Honourable Member for Kota Samarahan, as for the construction of the KEMAS Training Centre in Kota Samarahan, the land works and fencing of the area were carried out from the beginning of 2014 and completed in October 2014 at a cost of RM2.3 million. This is for land acquisition, yes. The construction of the training centre has been included in the planning of the Eleventh Malaysia Plan. The Honourable Member for Sepang also raised the issue of KEMAS kindergarten children who have a weak command of reading, writing and counting skills. For the information of the Honourable Member, KEMAS has implemented the National Preschool Standard Curriculum (KSPK), which is coordinated by the Ministry of Education.

Therefore, the co-curriculum and KEMAS kindergartens follow the National Education Policy and KSPK. The concept applied is learning through play. Most children in KEMAS kindergartens are five years old. Meanwhile, most six-year-old children enter preschool under the Ministry of Education. Based on the KEMAS study in 2013, children who had studied at KEMAS kindergartens up to October 2013 were found to be 63 per cent able to recognise letters and syllables and able to read simple sentences. KEMAS is also making efforts to improve this achievement. In addition, KEMAS plans to enhance the co-curriculum for Islamic studies among children who are Muslim. Mr Chairman, the next issue concerns an agency under the ministry's purview, namely the Majlis Amanah Rakyat (MARA). The Honourable Member for Bagan Serai, the Honourable Member for Pasir Puteh, and the Honourable Member for Sepang have raised the issue of establishing new MRSM in their respective areas. The Honourable Member for Parit Sulong raised the issue of establishing fee-paying MRSM. The Honourable Member for Parit Sulong also raised the issue of building MARA business premises on vacant land adjacent to MRSM Batu Pahat. The Honourable Member for Gerik also proposed the construction of business premises near MRSM Gerik, and the Honourable Member for Jerantut also proposed the construction of MARA business premises in Jerantut for rural entrepreneurs. The proposal to build MARA business premises in Labuan was also raised by the Honourable Member for Labuan. The Honourable Member for Jerlun raised the issue of MARA-sponsored students at Alliance University, AUCMS, while the Honourable Member for Kota Raja raised the issue of medical students following the joint programme with Universiti Sumatera Utara (USU) who still have not received a score. A proposal for the youth entrepreneur development programme implemented by MARA was raised by the Honourable Member for Sungai Petani. The Honourable Member for Parit Sulong also proposed that GIATMARA Batu Pahat be relocated to a new, more strategic location, while the Honourable Member for Sibuti proposed additional new courses in pastry or sewing at GIATMARA Sibuti. The Honourable Member for Lenggong proposed that KKTM Lenggong be made a branch of Universiti Kuala Lumpur (UNIKL). As for the proposal to establish new MRSM, requested by the Honourable Members who raised the issue, MARA will carry out a detailed study and consider establishing new MRSM in the area in the future. As for the proposal to implement fee-paying MRSM, it is indeed in MARA's plans to establish fee-paying MRSM using the existing MRSM learning modules. However, MARA is in the process of updating the existing modules and at the same time, MARA, through its subsidiary, is conducting further studies on the proposal to implement fee-paying MARA Junior Science College (MRSM). The Honourable Member for Kota Raja, as for the issue of MARA-sponsored students at...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, how many more Honourable Members are there? You may answer in writing, Honourable Member.

Ten more minutes.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

You may write it, Honourable Member, the last one.

I can indeed write it if I am instructed by Mr Chairman, because we want to answer in detail to give...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, less the queue lah, Honourable Member.

Okay, okay. In that case, I apologise to all the Honourable Members whom the ministry did not have time to respond to and explain the issues raised.

Rest assured, the ministry will send written explanations and answers to all matters not yet answered, and also those that the Honourable Members requested for more thorough explanation while I was answering just now. With that, I once again thank Mr Chairman very much. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Members, the question is that the sum of RM5,982,302,200 for Vote B.22 under the Ministry of Rural and Regional Development forming part of the Schedule be agreed to. [The question was proposed, and agreed to] [The sum of RM5,982,302,200 for Vote B.22 was ordered to form part of the Schedule]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The question is that the expenditure of RM4,525,462,700 for Vote P.22 mentioned in the Development Estimates for 2015 be approved. [The question was proposed, and agreed to] [The sum of RM4,525,462,700 for Vote P.22 was approved as part of the Development Estimates 2015]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The House resumed as the House of Meeting. [The House of Meeting resumed] [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) presided

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Members, this sitting is adjourned until 2.30 p.m. this afternoon.

[The meeting was suspended at 1.01 p.m.]

[The meeting resumed at 2.30 p.m.]

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

[The House sat in Committee] [Deputy Speaker (Datuk Haji Ismail bin Haji Mohamed Said) presided over the Committee]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 Committee — Head B.23 [Schedule] - Head P.23 [Development Estimates 2015] -Bill

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The Ministry of Natural Resources and Environment is open for debate. Yes, the Honourable Member for Silam.

Thank you, Mr Chairman. I wish to touch on one matter, namely Supply Vote 23 of the Ministry of Natural Resources and Environment, Item 16700.

Mr Chairman, the flood mitigation project, or the master plan for flood mitigation for the Lahad Datu division, was approved in 2000, and the project covers three rivers, namely the Pancuran River, the Tabanak River and the Sapagaya River. All three rivers flow out to the town of Lahad Datu. Previously, every time it rained for two or three hours, flash floods would occur in all these areas. After the flood mitigation project that began in 2004 was implemented, the Tabanak River and Pancuran River projects were completed, and after that, flooding no longer occurred along the Tabanak and Pancuran Rivers. Unfortunately, until today, the flood mitigation project for the Sapagaya River has not yet been implemented. This project, Mr Chairman, is worth RM220 million and it has many packages. As I have said, the Tabanak River package and the Pancuran River package have been completed and flash floods no longer occur. Unfortunately, as I said earlier, the Sapagaya River has still not been implemented until today. So every time it rains, flash floods occur. Mosques, village houses, roads, everything cannot be used because the water rises. Mr Chairman, I earnestly appeal to the relevant ministry, especially the Ministry of Natural Resources and Environment, that this project be implemented as soon as possible because it causes many problems when it rains and flash floods occur, so villagers cannot go out to town and cannot work. Residents who work in offices also cannot, because the roads have been inundated by overflowing river water. I observe that this flooding occurs because in the upper reaches of the river there was much rainforest that was cleared to plant oil palm. So when that happens, erosion occurs and this erosion enters the river, and so the river has become shallow. I can testify that 10 years, 20 years ago, this river was very deep and wide, but it has narrowed and its water has become shallow. Therefore, when there are flash floods, the water rises and overflows. So I appeal to this ministry to expedite this project, and the Sabah Water and Drainage Department has also written to this ministry to request allocation so that this project can be implemented as soon as possible. Another river, the Segama River, is actually the second longest in Sabah, after the Kinabatangan River, and this river flows across the Lahad Datu District. So when flooding occurs, the areas north of Lahad Datu are submerged by water, and this happens every year. Sometimes it happens twice a year, sometimes three times a year. So I ask this ministry to conduct a study on how this flooding can be reduced or, if possible, eliminated. So I really appeal to this ministry to implement the third package, namely Kampung Sapagaya under the Lahad Datu Flood Mitigation Project, and also to study how flash floods in the Segama River can be contained. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Hulu Langat.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Assalamualaikum warahmatullahi wabarakatuh. Mr Chairman, Head B.23 and P.23, Item 10300 – Environmental Management, which has the objectives of environmental protection and conservation, management of water resources and drainage, and sharing and use of geospatial data. Mr Chairman, to what extent does the ministry play a role in controlling water catchment areas so that they are not encroached upon for development? I ask for an explanation of the series of water catchment areas that have been outlined. Second, I very much hope for an explanation regarding the uses and benefits of geospatial data and the steps for its implementation. Third, referring to Item 16700, Head P.23 – Flood Mitigation Scheme. I would like an explanation of the flood mitigation scheme for the Sungai Serai, Hulu Langat, which has taken quite a long time.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

What are the obstacles and when will it be completed? Is the ministry not worried about the possibility of flooding in the current monsoon season?

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Fourth, Item 040000 – Minerals and Geosciences. I am interested in obtaining an explanation: does our country still have many minerals after we have successfully mined tin ore in Selangor and Perak, iron ore in Terengganu, and gold in Pahang? In the latest study, what minerals have been discovered, giving several examples of potential locations? Referring to Item 060200 – Environmental Education and Assessment and Item 060300 – Monitoring and Enforcement. What methods has the ministry implemented to provide effective awareness to the public regarding environmental care? I ask for a detailed explanation of the Geographical Information System (GIS) application system used for environmental management. Referring to enforcement, what success has been achieved in efforts to prevent forest encroachment that ultimately changes the ecosystem, as has happened in Cameron Highlands and Lojing? Item 080000 – Irrigation and Drainage. The ministry spends large sums of money to clean and deepen rivers. Based on observations I have obtained, the cause of shallow rivers and serious sedimentation is rampant development and developers not following the prescribed rules, namely not building functioning silt traps, and rampant deforestation, or in other words without considering environmental conservation and thinking about the occurrence of flash floods. Therefore, can the ministry, through the Irrigation and Drainage Department, issue warnings or take action and claim compensation from the developers involved for the funds for river cleaning and dredging in future. Item 130000 – Forest Research Institute Malaysia (FRIM). To what extent is FRIM's contribution in improving forest management in Malaysia, given that forests play an important role in absorbing CO2, namely 638 metric tonnes of CO2 equivalent per hectare, in reducing the carbon footprint in this country and also in controlling climate change. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Hulu Rajang.

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Thank you, Mr Chairman. I refer directly to 15000 – Minor Works of the JPS Various States. I wish to draw the ministry's attention to the drainage system along the road from Pekan Kapit to Jalan Selirik, which often experiences flooding whenever there is heavy rain. This happens because there is no well-managed drainage system, as this drain is only a drain dug with hoes since long ago. I request that the RM6 million allocation be increased, because the need to build a monsoon drain, with respect, is the final solution to the flood problem. Next, Mr Chairman, I would like to refer to Item 16700 – Flood Mitigation Scheme (RTB) and Urban Drainage. Please provide drainage for rural areas if this allocation is only given to urban areas. The very large sum of RM659 million, I think, if given a little to the problems along Pekan Kapit to Jalan Selirik as I have stated earlier, could at the same time prevent overflowing floods. I ask the ministry to consider my request. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Serdang.

Dr. Ong Kian MingDAP · PHSerdangEN

Thank you, Mr Chairman, for giving me the opportunity to debate the Ministry of Natural Resources and Environment. I would like to refer to the Enforcement Item and also to the Department of Environment, which has been allocated RM106 million. I would like to raise several issues which I hope the ministry can clarify. The first is the privatisation of the contract to assess and also enforce the sources of air pollution, which was given to a company called AMDS. This was also raised in the Auditor General's Report, in which one of the criticisms made by the Auditor General was that this third party, or the company carrying out this enforcement, has the right not to display or provide details about air pollution caused by certain parties. I believe the Auditor General raised an issue where the contract is said not to favour the government but to help the concessionaire company conceal important information. So I want to ask the ministry: why, even though the Department of Environment is given a large allocation and there are more than 1,000 civil servants working at the Department of Environment, the contract to assess or enforce air pollution is given to a privatised company? Another issue I want to raise is enforcement at two locations. I hope the ministry can clarify. One place is the Waste Transfer Station, with permission, at Taman Beringin, Kepong, where I and residents went to carry out measurement of the water sampling in the area outside the leachate treatment plant, with permission, and we sent the results and the water sampling results to the Department of Environment for action, because the pollution there is indeed serious. However, for now, although the Department of Environment has sent me a letter to give assurance that action will be taken against Alam Flora and also the party managing this leachate treatment plant, on 1 November, when residents in the area went to visit the site, the same pollution was still there. The third issue on which I want an explanation from the ministry concerns the data on pollution or effluent discharged by factories around Peninsular Malaysia. In my constituency of Balakong, there have been several occasions when the water treatment plant had to be shut down because of water pollution. I and the Selangor State Government have asked the Selangor State Department of Environment to provide data on water pollution by factories in the Sungai Langat area so that the Kajang Municipal Council can take appropriate action. However, unfortunately, the Selangor State Department of Environment said that this data is OSA, or secret. I think this is absolutely unacceptable because this pollution has caused hundreds of thousands of people not to have water supply in the Balakong area and also in Hulu Langat, and if such things continue to happen, Putrajaya may also be affected, because there may be many more factories discharging effluent into Sungai Semenyih and so on, causing water pollution at the Semenyih Water Treatment Plant, which supplies water to Bangi, Kajang and also Putrajaya. The last issue I want to raise is the environmental impact assessment for the Forest City near Gelang Patah in Johor, where previously the Deputy Minister said that a DEIA was not necessary for land reclamation, with permission, at that site because the land reclamation was less than 50 hectares. However, when my colleagues from Johor visited this site, the land reclamation was indeed very large. According to the plans also displayed by the developer, namely Country Garden, many units have been sold on this reclaimed land, which I am certain is more than 50 acres. There was also The Edge newspaper which reported that this land reclamation would affect the position of Port Tanjung Pelepas (PTP), which may cause ships to be unable to enter the area.

Dr. Ong Kian MingDAP · PHSerdangEN

So I think this issue is indeed serious. I think the ministry needs to give a detailed answer, and I hope that the ministry can also arrange an official visit together with the Members of Parliament or State Assembly Members for the places I have mentioned earlier, so that it can assess whether all the water, air and land reclamation pollution follows the guidelines or conditions that have been set by the ministry and the Department of Environment. That is all. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Jelebu.

Thank you, Honourable Mr Chairman. I have two matters to raise relating to the Ministry of Natural Resources and Environment under heading B.23, Item 080000 - Irrigation and Drainage. The first is the issue of legal jurisdiction under the Drainage and Irrigation Department, because there is a case in my constituency of Jelebu, namely at Kampung Hosapa Titi, where a river crosses a piece of privately owned land, and the river has already been diverted to a new course by the landowner concerned. This has caused a bottleneck which produces flash floods in the upstream area of the river. So I want an explanation from the ministry: does the ministry or this Drainage and Irrigation Department have the jurisdiction to restore the river to its original course? This is because the landowner concerned does not want to return it to the original river, although I understand that the department has the authority to impose a fine. In my view, imposing a fine does not solve the problem. The problem is that we want to put the river back, which flows across privately owned land diverted by the landowner, in order to solve the problem of water flow not being blocked, which has been identified as the cause of flash floods in the Kampung Hosapa Titi area. So I ask the department for an explanation: does it have the authority to return the river to its original position? If it does, why has it not been used to resolve the case or issue of flash floods in the Kampung Hosapa Titi area caused by the river diversion made by the landowner concerned because they wanted the land to be more attractive and more perfect? That is the first. The second concerns flash floods also under the same heading and item, namely in an area of Kampung Baru Ladang Jelebu, Taman Sri Kenaboi and the surrounding areas in the Jelebu Parliamentary constituency, where this area is identified as a place that often experiences flash floods during the rainy seasons, especially towards the end of the year. So I ask the department to carry out a specific study on the causes and reasons. This has been raised many times, asking the technical department to sit down and carry out a study, because the surrounding areas are now developing. The existing rivers and drains can no longer cope with flooding during heavy rainy seasons or towards the end of the year. Therefore, I respectfully ask the Drainage and Irrigation Department to carry out a detailed technical study and propose its solution, one for all, with permission, Mr Chairman, so that residents in the areas of Kampung Baru Ladang Jelebu, Taman Sri Kenaboi, MRSM, Taman Chempedak and so on are no longer in a worrying situation every time the monsoon season or the end of the year arrives. So those are the only two matters on which I seek an explanation, cooperation and attention from the ministry and the relevant departments in particular. Thank you, Mr Chairman.

Thank you, Mr Chairman. I merely wish to draw attention to Item 16700 - Flood Mitigation Plan, which originally was to cost RM4.6 billion.

This is a heading that is constantly raised by Honourable Members, especially the Honourable Member for Rantau Panjang, who frequently experiences floods. Therefore, next year, this continuation project will be paid with a value of RM893,232,400. Accordingly, I would like to obtain information from the Honourable Minister so that he can inform this meeting, which projects will be paid with that amount, and whether the project that is often raised by the Honourable Member for Rantau Panjang is included in the list of projects to be implemented in 2015? Thank you.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

Thank you, Mr Chairman. I am also here to debate in the Committee, the Ministry of Natural Resources and Environment under Head B.23, Item 02000 - Land Management and Legislation, which is allocated RM201 million. I only want to ask KPTD, how much is the total of forest reserves across the country? Then, how much of the forest reserves have been converted into government land? So far, I ask the ministry to be able to clarify these matters. Under Item 030000 - Survey and Mapping, it is the same. I see that when land is granted to the people in every area, the residents' committee usually has to look for a paid surveyor, but we see that a large allocation is provided under the Department of Survey and Mapping amounting to RM274 million. Is there no surveyor from the Department of Survey and Mapping who can come to assist the Land Offices at state level? I also want to speak about the heading Head 040000 - Minerals and Geosciences. One thing I see is the tin mining carried out at Kelian Intan, where the JMG has been entrusted with looking after the mining area. The question is, when control is needed because of mining that is said to pollute rivers, when explanations are given by the JMG, it is said that only two officers are looking after the whole state of Perak. I hope I can get an explanation from the government so that it adds more officers under the GMG so that control over ore mining, especially those operating at Kelian Intan, can be increased, because the people have complained that many fish have died in the river when it is said that chemicals have been channelled into the river. However, in reality, when I looked at the site, it is not a matter of chemicals; in fact, river control is not being managed properly, because when the mining operators were asked, in the non-rainy season, the fish did not die, but when the rainy season comes, then the fish die. This shows that drainage is not being managed well; when rain comes, it causes sediment and silt in the river to scatter, which may cause fish to die and also maggots to appear. This is because we know that chemicals are produced when sand and soil break down in contact with water, and perhaps the mining operator's control over the ponds that should exist, three to four levels, is not managed well. Perhaps lime is not being spread on the water that comes out of the mine, causing its pH to perhaps fall below 3, and what is produced is acid which can cause fish to die.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

I also want to speak on 050000 – Forestry, which is allocated RM33 million. I would like to ask the ministry how much of the forest reserves in the state of Perak have been excluded, the amount that has already been removed from the forest reserves? And how is the management of the forest done? It was reported that trees were replanted, but I seem to see- yes, we do not know the reason in the forest, because I believe that in the Gerik Parliamentary constituency is among the largest forest reserves in the state of Perak. If it is not managed well, we are worried that in the future the Upper Perak area will lack timber trees that can provide a source of income for the state of Perak.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

At the same time, how does the forestry authority control the forest when we know that in several forest reserves at Royal Belum and Temenggor, the precious aloeswood is stolen not only by professional thieves within the country but perhaps also from abroad, such as Thailand, Vietnam and various others. Therefore, I ask the Forestry side to explain that matter. At the same time, I also want to speak on heading 060000 – Environment, which is allocated more than RM123 million. In terms of the environment, it is how the environment department helps to monitor pollution caused by development across the whole country. Is that pollution controlled by the government merely through reports? Does the environment department itself visit factories, visit development sites, visit mining sites, or visit any place said to have no control over pollution, which causes the people to face the pollution problems that occur? So I ask the ministry to clarify that matter. I also want to speak on heading 070000 – Environmental Protection and National Parks. In the Royal Belum area, we know the oldest forest in the world. I want to ask the PERHILITAN and the government, to what extent does the government monitor and assist with illegal hunting to kill elephants to obtain ivory? Likewise, illegal hunting to kill tigers in the Royal Belum area. At the same time, I thank the ministry for building a flyover road from Kelantan to Gerik, where a road is provided for animals to cross in the Royal Belum area, especially for elephants to cross: above, cars pass over, and below, elephants can pass through. It is now under construction. I hope that the project undertaken by the ministry will succeed in ensuring that all animals in the Royal Belum area pass through the crossing. Perhaps the outside world does not know, but at least I think if it succeeds, tomorrow we can see with the naked eye elephants passing through, following the existing route. Likewise tigers and other animals in the Royal Belum area. At the same time, I sincerely hope for cooperation between the state government and the ministry to ensure that an elephant sanctuary can be developed in the Royal Belum area, next to the Royal Belum area. Likewise, the state park that has made arrangements to set up a tiger sanctuary within the Royal Belum area, because in this world it is understood that there are only five places for tiger sanctuaries. One of them may be built in Royal Belum, and I sincerely hope that the Federal Government and the state government together with the State Park in Royal Belum can make the tiger sanctuary area in Royal Belum a success. I understand that there are more than 150 Malayan tigers, but what worries me most is illegal hunting from abroad, because there is a group among us who are very interested in eating tiger soup. This is because they say that eating tiger soup can strengthen one's inner energy. I myself am not sure about that matter.

Dr. Ong Kian MingDAP · PHSerdangEN

Can the Honourable Member add a little more?

Boleh.

Dr. Ong Kian MingDAP · PHSerdang

Tuan Pengerusi?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya sila.

Dr. Ong Kian MingDAP · PHSerdangEN

Thank you, the Honourable Member for Gerik. I indeed agree with what the Honourable Member has proposed and asked. I myself recently stayed at the Royal Belum Resort, and I think it is a first class resort and should be promoted more so that everyone knows, not only within the country but also abroad, that Royal Belum indeed has many attractions that can be enjoyed. I want to ask the Honourable Member whether he agrees that not only must illegal hunting be closely monitored by the ministry, but at the same time illegal smuggling must also be monitored well.

Dr. Ong Kian MingDAP · PHSerdangEN

Because if this illegal smuggling is not monitored well, I think irresponsible people will use Malaysia as a transit point to capture such animals and then export them, or kill them and then export them to other countries. Thank you.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

Thank you, the Honourable Member for Serdang. I am very aware of that matter, because when arrests are made, sometimes pangolins amount to two or three large lorries. However, I understand the pangolins may come from Thailand. Only, what the Honourable Member for Serdang meant earlier is that this is a major smuggling route. Likewise with aloeswood, and likewise with pangolins, monkeys are also smuggled through there. So we very much hope that the government will pay attention, and I do not want Royal Belum to become a major smuggling route between two countries, which is where we need to focus attention. Thank you. Then I want to speak on 080000 – Irrigation and Drainage...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Gerik, the Honourable Member for Gerik. Time is up.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

One more point.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ringkas.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

That is drainage and waterways. We know the world is now changing in terms of weather, and there is a great deal of rain: flash floods, mud floods and ordinary floods occur. I ask the ministry to make a planning study across the whole country so that these floods that exist now... if we do not carry out a planning study and then prepare a flood mitigation budget, I believe that highland areas and lowland areas that until now have had no floods and no flash floods will incur greater expenditure in the future. What is wrong with the Ministry of Natural Resources and Environment studying places that have never flooded, to draw up a development plan to study how river deepening and the granting of sand licences, not merely for profit but most importantly to deepen again the channels that exist, can be done. Where we look today, only today do we realise. When I was small, I was shocked why licences to extract sand were given along the whole river mouth; now there are none. When we look at the flash floods that exist today, only then do we see that one of the purposes of giving sand licences to operators was to deepen the rivers. So among the places that received severe impact when this rain fell is Pekan Gerik, which until now has rarely experienced flash floods. This is because although the flood lasted only an hour, it caused destruction and damage to the people, to the public. Regardless of buildings in the village, regardless of terrace houses and bungalows. Therefore I propose that, I hope the ministry carries out a study and considers the best allocation. If we merely want to carry out a study, it requires high expenditure. So with that, thank you. I support the allocation for the Ministry of Natural Resources and Environment. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Sungai Siput.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

Yes, thank you, Mr Chairman. I have four points. The first is under Item 010300.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

I see the Honourable Member for Sungai Siput said just this much.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

But not much written down.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

Item 010300 – Haze Problem. I want to ask, how much allocation is there in the Ministry of Natural Resources and Environment to tackle this issue? This is because I see the important problem, because the important thing is the lowering of groundwater (ground water) in Kalimantan and Sumatra, because the Indonesian Government has built irrigation canals to use that area for agriculture. But it has gone too far and the water level has dropped down. This is a major cause and this must be addressed. But the area involved is so vast. So perhaps we need to help Indonesia in this matter. So, I hope our government saves a bit of money in this. This is because it is a big problem; we get haze several times a year and it brings several types of dangerous chemicals to us. The particles are so small and we can breathe them into the lungs and this affects our health. So I think the people of Malaysia will not question the government as to why we spend money on this matter. I hope…

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Seek a little clarification.

Dr. Michael Jeyakumar DevarajPSM · PRSungai Siput

Okey.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Mr Chairman. I want to seek clarification from the Honourable Member for Sungai Siput and also from the Minister that this morning the Minister answered, saying there is an MoU to build small dams to retain the water level and water table in peat areas. But the problem is that although we have plans to build these dams with the Indonesian Government, the area involved is too large. How can the government- I ask the Minister, if possible, to explain how these projects can solve the peat fire problem. Because if we build a dam in one area, another place will burn. So how, and how many dams do we need to build? Thank you.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

Yes, thank you, the Honourable Member for Bayan Baru. I think we have to build many dams. For a river, we have to build these dams every five kilometres or more often, looking at the gradient. But these dams can also be made into mini-hydro projects that can bring benefits to the people there. So I hope we take this seriously, and if we do not address the root cause, because that root cause cannot be solved, we cannot solve the haze problem. The second issue I want to raise is with Lynas. I want to ask, how much solid waste from Lynas has been released until now? Where is it stored? What are the proposals regarding this radioactive solid waste? Previously we heard there was a proposal to send it back to the mine in Australia. Will that be done? But I really hope they do not spread it everywhere in Pahang, to use for building roads or houses. Please do not do that. This is because there is no level below which radioactivity is not dangerous. It is dangerous. Even at low levels it is dangerous. Making roads with it, I think that is not good for our people. So I hope we do not do that. The third issue, Item 080000 – Irrigation and Drainage. Will the Ministry of Natural Resources and Environment carry out a study on the impact of the raw water transfer scheme from the Pahang River to Selangor? I read on the net that the rate is estimated at 1.9 billion litres a day. What percentage of the water in the Pahang River is this? These 1.9 billion litres per day. What percentage is this during the season, what percentage in the dry season, and if the impact is significant, is there a possibility of salination, meaning seawater entering the downstream of the Pahang River? What is the impact on the fishing industry? What is the impact on fish breeding areas? What is the impact on the water supply for Pekan? So all of these, has this been studied? This is because you are releasing such a huge amount. So has this been studied or not, or are we going to do it and then say, oh no, there is a salination problem.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

Last of all, under Item 060300 – Enforcement. I want to ask, how much carbon dioxide is emitted in Malaysia a year? What is our output? What percentage comes from electricity generation? If we compare coal with other hydrocarbons, how many tonnes of carbon dioxide per megawatt are emitted through coal-based generation? We want to know that. Another thing, what percentage of cars, lorries and other vehicles, and what is the government's master plan to reduce our carbon footprint? Okay, thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Jerantut. Touch on Kuala Krau a little, the Honourable Member for Jerantut.

Thank you, Mr Chairman, for the opportunity given to me to take part in the debate on the Ministry of Natural Resources and Environment. I want to speak on Item B.23, on the environment, namely Item 060300 – Enforcement on the Environment. Recently we were shocked by the mud flood in Cameron Highlands, and yesterday news reports stated that Bandar Kajang was submerged by floods. Both of these incidents are caused by human attitudes, through greed to seek wealth for oneself, which in the end brings disaster upon us. I want to invite all Honourable Members today to think about why this has happened. Destruction of the environment is increasingly occurring, sometimes right before our own eyes. We do not want to place the blame for this solely on this ministry, because they too have made every effort to safeguard the interests of our natural heritage. But looking at recent developments, river pollution is becoming more serious today. If we look at Pahang itself, particularly in the Parlimen Jerantut, Lipis, Kuala Krau up to Temerloh, the water of the Pahang River, which at one time was clear, has today turned into the colour of teh tarik. Come to Jerantut, Lipis and Kuala Krau bringing only sugar, and you can get free teh tarik. What is the cause? What are the weaknesses that cause this to happen? Do we not have enough officers to monitor or act to overcome and save our environment? Do we not have enough sophisticated equipment to overcome it? Have our officers' integrity declined? So I propose to this ministry that if there is not enough allocation, please apply for more. Let us buy sophisticated equipment so that monitoring can be carried out more effectively. Do not have any more excuses. When they want to monitor, they cannot see the area to be monitored because of a lack of equipment. We have been independent for a long time, so surely we do not have an allocation to enable this...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Jerantut. The Honourable Member for Jerantut.

Yes, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

It would be good for enforcement officers to be provided with monitoring motorboats on the water.

Yes, including speedboats, jet skis and so on, specifically on the Pahang River, because recently…

Just a moment, the Honourable Member for Bukit Katil, yes. This is because recently, if we look at the Pahang River, there have been efforts to deepen the river because there is already far too much sand, including within Mr Chairman's own area. When this sand is dredged, it causes the strength of the riverbank to become weaker. This is also a new problem. So we are doing the same work throughout the year. Please, the Honourable Member for Bukit Katil.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Thank you, Mr Chairman. The Honourable Member for Jerantut raised earlier, at the initial stage, the issue that struck Cameron Highlands.

I want to ask the Honourable Member for Jerantut that, following this terrible incident, the Menteri Besar of Pahang recently made a statement calling on the Malaysian Anti-Corruption Commission (SPRM) to investigate corruption and abuse of power, particularly regarding the widespread issue of illegal land clearing. The most shocking thing is that the Menteri Besar of Pahang himself stated that among the most problematic matters are that the Land and Mines Office and the Forestry Department do not have sufficient staff, and besides that do not have financial allocations to tackle whatever problems occur in these highland areas. Does the Honourable Member for Jerantut agree or not that we propose to the ministry that it take this matter seriously and ensure that such terrible incidents that shame us do not happen again?

Thank you, the Honourable Member for Bukit Katil.

Dato’ Othman bin AzizUMNO · BNJerlunEN

Add a little on the same matter. Mr Chairman, the Honourable Member for Jerantut...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Jerlun, not yet invited. Please.

Dato’ Othman bin AzizUMNO · BNJerlunEN

Thank you. We see that every year, every time, incidents like this happen. Okay, now people are talking so loudly about Cameron Highlands. The issue is that we are puzzled as to who holds the power. Power, of course, is understood to cover forests, rivers and water. That is state power. But when incidents like the landslides, mud floods and so on happen, people blame the Federal Government. So, where is the role of the Ministry of Natural Resources and Environment? Even if, as the Honourable Member for Bukit Katil said earlier, the Menteri Besar of Pahang asked the SPRM to investigate, an investigation can be carried out. The issue is that the damage has been done. That is the issue. Surely when we drive to Cameron Highlands, drive to Lojing, we see that illegal land clearing is indeed going on right in front of us. The terraces that have been made are very nice. So we are puzzled, which party should close their eyes, or who deliberately closes their eyes, until a mud flood happens, until people die and so on, and only then do we want to act. Even if we act, we can at least arrest whoever is involved. The problem is that to replant even one tree takes 50 years, 60 years, up to 100 years. That is the issue. So, where is the Honourable Member for Jerantut's view on the dividing line of this power, the power that exists. Thank you.

Thank you, the Honourable Member for Jerlun. That is why I said earlier that the problem that exists cannot be placed solely on the government or the Ministry of Natural Resources and Environment. All levels of society, private individuals, the State Government, the Federal Government, and the various government agencies involved must together bear responsibility. We return again to integrity. I questioned earlier whether our integrity today has increasingly declined because of the rush to seek wealth for oneself, and we forget the environment. It is similar to the concept in Cameron Highlands. At one time, Cameron Highlands was not a centre for growing vegetables; it was a resort. But because of seeing the greater wealth, it was changed indirectly.

In terms of enforcement, we also cannot blame the State Government alone; there may be faults in enforcement too. I would not agree with the Honourable Member for Jerlun that all the hills have been cut and yet why is it so slow. All of us. The media too, when they see just a little, should immediately magnify this issue so that everyone opens their eyes before it happens. Today it has happened, and everyone wants to take part. We make advertisements saying we will crack down on illegal immigrants, then do nothing, and in the end the illegal immigrants have fled God knows where. This is our style. Three months after this, everything goes quiet. We wait for another incident before everyone gathers again. So, Mr Chairman, I want to bring up the second matter, namely B.23 040000 – Minerals and Geosciences. Under 040200, river pollution due to industrial waste and mining. Again. If in the Pahang River now, as I said earlier, the water is like teh tarik, it increases the operating cost of water purification. I am informed that when I visited the water supply plant in Jerantut, previously the reading, in terms of sediment content in the Pahang River, was around 400 or below, causing the average cost of water purification to be about RM30,000 a month. Today the concentration has already increased to 1,200, and the latest reading is more than 3,000, as a result of the floods from Cameron Highlands and the miners taking the opportunity to release their holding ponds into the Pahang River. In the end, the entire plants along the Pahang River from Lipis, Jerantut and Temerloh had to be shut down. In the end, consumers feel the impact. So I ask, through this allocation given, once again, if we do not have sophisticated allocations and sophisticated equipment, let us buy them. If there are not enough officers, we add more. If our officers lack integrity, let us send them to any of the existing centres to enhance their integrity so that a greater catastrophe does not befall us. This is because we are sure that if in Pahang the pollution may be due to mining and logging, but in other places, in Kuala Lumpur for example, it may be factory waste that causes this pollution. Not after this, ministry. If there is not enough power, ask for power so that whatever form of pollution this is, we can overcome it. I also ask the Department of Minerals and Geosciences, when carrying out monitoring or taking samples for water quality, not to take them based on office hours, especially for the Pahang River. After rain, the flood waste and sediment is released. But if we do it on a normal day that is not the right time, then surely the sampling we take will not be accurate. Regarding the matter...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Terakhirnya.

Insya-Allah, the last one, Mr Chairman. B.23, Item 08000 – Flood Mitigation and Urban Drainage Scheme. Today people living in towns feel unsafe everywhere when the rainy season comes. In Kuala Lumpur, in Kajang, in Kuantan. We who live in these small towns feel safe. Why has all this happened? Perhaps this is due to a weakness in our planning. Secondly, it is a weakness in our own attitudes, which are irresponsible, and also the monitoring by the Drainage and Irrigation Department, which does not give the real emphasis, or we are not given sufficient allocation, which causes the small rivers in the towns to flood when heavy rain falls for a long period. So this is also not exempt in Bandar Jerantut, Mr Chairman, which will be threatened by floods if the Sungai Betong as it is now is not given additional allocation for rehabilitation works on this river and for straightening the river flow. So I request, Mr Chairman, that a little allocation be given to improve the flow of the Sungai Betong in Jerantut. Lastly, Mr Chairman, namely the protection of wildlife...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

He has "last", "final" and "the very last".

I want to record my thanks for providing the allocation for Jerantut for the purpose of preventing elephants from entering villages. This is important, Mr Chairman, because they can also enter the Kuala Krau area, and Kuala Krau too will be threatened by elephants if this allocation is not given. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Also no additional time. Yes, the Honourable Member for Parit Buntar.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Just a moment, Honourable Member for Parit Buntar. I want to ascertain how many more people wish to speak. Seventeen people. I propose that the Honourable Minister begin replying at 4 p.m. Could it be five minutes, please? Five minutes, is that all right?

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit Buntar

Bismillah.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

InshaaAllah. Honourable Member for Parit Buntar.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Thank you, Mr Chairman. I only want to touch on 060300 under the heading Enforcement and Monitoring. The same matter has been repeated several times by colleagues regarding the incident that took place in Cameron Highlands. The incident in Cameron Highlands teaches us, as Members of Parliament sitting here, to discuss the most important issue. Indeed, we agree that we do not want to blame any party, but there is one major issue that we must discuss here, namely first, the level of enforcement and also what is called good environmental governance. So I feel this raises various questions. For example, the Department of Environment is responsible for ensuring that the Environmental Quality Act 1974 is enforced. Likewise, the Department of Environment ensures the guidelines for what is called highland land, how to manage highland land.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Likewise, the Department of Environment plays a role in advising the District Office and the Land Office. In fact, all of that already has its guidelines. But why does the impact of the ineffectiveness of everything mentioned just now still occur? Why does it still happen? I see that this problem depends largely on how other agencies, such as the Department of Agriculture and the Agro-based Industry, behave. We can tell that in Cameron Highlands, what is called extreme farming has been carried out to the point of having no mercy on the land at all. How could a big department not manage or not coordinate with the Environment side, to the point that the opening up of these illegal lands happens in a manner that cannot be controlled? It is not only today, Mr Chairman, but this matter has been highlighted since the year...

Bertahun.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

For years since 1998, 1999, 2000 and 2001. But why does this matter still drag on? The same goes for the state government. Although we do not blame the state government, the land belongs to the state government. How is enforcement over these lands, which were cleared without any control or monitoring, when all the conditions for opening agricultural land have been laid out? Indeed, a study shows that 80 per cent of those cultivating illegal farms in Cameron Highlands exceed the permitted steep-slope limit, which is 25 per cent and above. How could this happen?

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

After that, the water quality is polluted because they use fertiliser waste discharged into the rivers, to the extent that there are E. coli elements, [Interjection], which can cause danger to humans. So I am surprised why there is no good governance, including the Royal Malaysia Police (PDRM), the police and the immigration department? It is said there are 36,000 illegal immigrant workers there. In my view...

Ramai itu...

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

36,000 people, that is not a small number. In my view, the issue is that we cannot be too apologetic. We say we are not blaming the Federal government, we are not blaming the state government, this is our responsibility. Yes, it is indeed our responsibility. But who is enforcing it? I want to ask the Honourable Minister, how many Department of Environment enforcement officers are playing this role? How is their cooperation with the PDRM? I am given to understand that in 2007 to 2008 there were several arrests made, only six people were detained for encroaching on illegal lands under the Forestry Act Department. Can we imagine, with what has happened today, how weak the enforcement by the Department of Environment is, when only six people were detained in 2007 and 2008? It cannot be that a mudslide happened and people died - only six people were detained in 2007 and 2008? I want to know, how many more were detained? I ask that these people be brought to court. If they are guilty, it must be told to the people. This is what caused everything that happened in Cameron Highlands. This is not- this is the tip of the iceberg, with permission. There are many more problems in other places that we will find later when the issue is here - it is not that there is no policy, the issue here is the effectiveness of what is called environmental governance. I ask the Honourable Minister and the Honourable Deputy Minister, as people who are firm on this issue, how do we coordinate with the other ministries? The Ministry of Home Affairs, the Ministry of Agriculture and Agro-based Industry, the state government, the Forestry Department, and the District and Land Offices. So I ask, how far has the enforcement carried out so far been effective up to this moment? Because I think the government has spent millions of ringgit to ensure projects on high slopes and environmental projects. How many trees have been planted to cover up the illegal logging that has happened, Honourable Minister? I ask for one answer. I am given to understand that last year the Honourable Deputy Minister for Natural Resources gave an answer. He said there is a project to replant trees to cover up the logging that has taken place and the agriculture that has taken place.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

The allocation is approved, but I want to know...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Member for Parit Buntar.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Yes. How many trees have been planted to restore the balance of the environment? Finally, I ask for one more matter, which happens in my constituency, under Head P.23, Item 08601, namely Planting of Mangrove Trees and Suitable Species on the Coastline. I want to know today that encroachment on mangrove areas or mangrove forests is rampant, where in my own place, I have met with the District Office, and how shrimp farmers use this land to make their shrimp ponds. This has caused a violation or encroachment on the tobacco forest. I want to ask how the Federal government can coordinate with the state government regarding this land so that land is gazetted as a Mangrove Forest Reserve? This is because along the coastline from Tanjung Piandang, Kuala Kurau up to Kuala Gula, rampant encroachment has taken place by entrepreneurs for economic interests. But they forget that this will undermine the Mangrove Forest Reserve. I ask and request an explanation. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, I see the Honourable Member for Bintulu. Please.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Thank you, Mr Chairman...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Only five minutes.

Terpandang untuk...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

There is no collusion, is there?

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

There is indeed collusion. Mr Chairman, thank you for giving me the opportunity to debate the debate on the Ministry of Natural Resources and Environment. I do not know about this Ministry. The other day I asked about floods. Now I want to touch on floods and other matters. Now I want to touch on Item 15200, Item 15300 and Item 16700. For Item 15200, I see that we have- I see that we have an allocation of RM110 million prepared to repair, beautify, clean and treat river water and infrastructure. We indeed see a large allocation. In my constituency, I know the Ministry has no allocation. People from the villages and from the longhouses ask me, "Why do our rivers have no allocation for cleaning? Before there was, now there is none?" Give them the chance to do gotong-royong, every longhouse, however much we give, ask them to clean up. What is most troubling, if we go to Bintulu and look at the river there, there are so many rubbish bins. I also do not know how the Drainage and Irrigation Department, or how we look after these rivers so that rubbish bins are not seen all around? Why is there no cleaning? We see there is an allocation but...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Are they rubbish bins or rubbish?

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Rubbish bins, but it's all rubbish too. All kinds of things are in that river. This is collusion. I want to ask the Honourable Deputy Minister, when will this allocation be ready for Bintulu? Only then can we clean that river. When can we start cleaning the river? I want to touch on Item 15300. Mr Chairman, I have received this answer many times. They say they do not dredge or deepen the river mouths. Earlier I asked why we have an allocation ready? The answer given to me was, "Their river mouth is not your responsibility. The Malaysian Marine Department is responsible for it." I have asked many times where that river mouth goes? Ask for it to be deepened. It has been many times, but apparently the department is not interested. I do not know what the problem is. I have raised it many times.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

If the river mouths are not deepened, then the maritime boats cannot go out when the tide is low, and the fishermen cannot go out either, they can only go in. This is why the people are angry. I do not know whether officers from the Drainage Department, or the Ministry, or the EPU, cannot hear the voice in this august House. I do not know why we cannot take this matter seriously? I have been through four terms on this issue, asking for the river mouths to be deepened. We have met many times, but I see the Ministry is not taking this matter seriously at all.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, one more minute.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

And also... Yes?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

One more minute.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

How can that be, it has not reached it yet. This is the people's problem and must be raised, otherwise it will be like Kuala Krau too, it must be deepened too, otherwise Mr Chairman's area will also flood.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, one minute.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Yes, I now want to move on to the matter of floods. Item 16700 - Flood Mitigation Plan (RTB) and Urban Drainage. I hope the Honourable Deputy Minister listens carefully. Last Saturday, I was scolded by the women thoroughly. Once after 8 p.m. and once at 1.30 a.m. This flood is not an act of God, this is a human-created flood. I asked the Honourable Deputy Minister that day, my allocation was not debated. Sarawak, a state, has only RM20 million, but it has not even reached that. Yes, only RM17 million, RM20 million has not been reached. Why is the Ministry not taking this matter seriously? I asked the female officer sitting there, if our houses flood, what do we do?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Why is that, Honourable Member for Bintulu? Why ask the women, and not the men?

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Eh? Earlier it was because of washing, many women were washing. This is why they are angry, their hearts are hot with me... [Interjection] This is why I say this is a serious matter. Why is it so difficult to deepen the Sebiew River? I suggest that if it rains like today, if another hour passes, there will certainly be a flood again. Come, officers, come down to the field with me and see how the people curse us. Several times I have already said, ask for it. If we cannot get RM20 million this year, then give RM3 million or RM5 million.

Tuan Lim Lip EngDAP · PHSegambutEN

Honourable Member for Bintulu, you may interject.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Give me the chance first, don't...

Tuan Lim Lip EngDAP · PHSegambut

Mencelah.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

You have nothing to do with Bintulu, so don't make a noise. [Laughter] Why can't they give it? How many times have I asked about this item? The other day we gave RM500,000, look, they have already dredged... [Interjection] They have dredged a little. Some gardens that did not flood are less now, other gardens still flood. That is why it must be in the whole Sebiew River. I have already said, there is siltation, it must be deepened. Does this officer not think, or did he go to school, where does he keep his brain? If we just build embankments, it is no use if the river is not deepened. How many times have we asked? The people are angry with us. During polling day, we said the Barisan Nasional would help, but after getting the votes, they forgot the people's problems. This is why we give the opportunity to the opposition. Do you understand or not? I am asking the EPU, use your brain a bit. This is important, if the people flood, we have to pay compensation again, we have to pay consolation money again, and the people will not say thank you to us. The people hate us even more. We give RM500 or RM1,000, what can people buy? Buy underwear or buy a sofa.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Member for Bintulu, that's enough.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

This is indeed collusion, Mr Chairman. I ask the ministry to answer whether the problem of Bintulu and the Sebiew River can be solved? If there is no proper answer, this time I will surely fight. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Member for Kota Kinabalu... [Interjection] Don't get angry, don't get angry.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

There is an important issue, Mr Chairman. Thank you, Mr Chairman. Referring to forestry, Head P.23 under Item 10804 - Heart of Borneo (HOB) Project for Sabah State, which will be allocated RM1.8 million in 2015. Mr Chairman, the Sabah Forestry Department (JPS) only celebrated its 100th anniversary this week, and its Director, Datuk Sam Mannan, has requested an allocation from the Federal Government through this ministry. It is said that 860,000 hectares of forest reserves have obtained Forest Management Certification. The target in the future is 1.1 million hectares in total in Sabah under the Heart of Borneo Project. I ask the Honourable Minister to take seriously several issues involving forest management under JPS. Last Sunday, the Daily Express newspaper in Sabah issued a statement titled, "Former manager files suit against Sabah Foundation Group". A former environmental manager, a subsidiary of Sabah Foundation Group. Rakyat Berjaya Sdn. Bhd. (RBJ) has filed a suit against three senior staff of Sabah Foundation Group for asking him to go to another section relating to the report on the death of 14 Borneo Pygmy elephants in the Gunung Rara Forest Reserve last year. This is a serious control. The Member of Parliament for Kalabakan once asked for an investigation to be carried out into illegal logging activities in the Gunung Rara Forest Reserve near Tawau following the incident of the death of 14 elephants in the area earlier last year. It is quite clear that the habitat of the animals was affected by illegal logging, and at the same time this became the cause of the death of the elephants. Preliminary investigation shows that all the elephants in question died from poisoning, poison. It is not difficult to investigate where the elephants died. Who is the contractor near that site? Who is the supplier of the poison, the contractor and so on? The death of the Borneo Pygmy elephants is very sad in the effort to preserve the environment and wildlife in Sabah. Not only that, but it raises various questions in the hearts of the people. Why was no detailed investigation carried out? Especially why illegal logging activities that still occur in Sabah cannot be curbed and dealt with at all? Mr Chairman, I urge, I call on the government, but there has been no direct action from the Sabah State Forestry Department, which should act as the guardian or protector of all forest reserves in this state. The Director of JPS, Datuk Sam Mannan, claims that the rate of illegal logging is at its lowest level in history. How can we believe his statement with the mysterious elephant death cases, and the same logging at the geothermal power plant site that is rampant? Mr Chairman, another serious issue. Perhaps this is the first time in world history that oil palm plantations are not planted on plantation land but inside forest reserves, Mr Chairman. Why can oil palm be classified as a forest reserve? Is this logical, Mr Chairman? Are there differences in the guidelines or the definition of forest reserves of the ministry between the Sabah Forestry Department? This is indeed happening now. I give an example, Berita Wawasan Sdn. Bhd is a wholly owned subsidiary of Innoprise Corporation, where Datuk Sam is also one of the board members. It obtained approval from the Sabah State Forestry Department to cultivate 82,000 hectares in the Sabah Foundation concession area since 2004. All 82,000 hectares of this land are located in the Gunung Rara Forest Reserve, Kalabakan, right in the Heart of Borneo.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

According to the arguments of the Forestry Department - okay, let me skip a bit. With the implementation of the Roundtable Sustainable Palm Oil (RSPO), an international standard to ensure the palm oil industry is managed sustainably, I am worried that the oil produced...

Datuk Dr. Marcus MojigohUPKO · BNPutatan

Boleh?

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Oil produced from Benta Wawasan this...

Yang Berhormat...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Member for Putatan, go ahead.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

Cannot, cannot, no time, short.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Tiada masa.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

Honourable Member for Kota Kinabalu.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Benta Wawasan this cannot be certified...

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

...I was interested in the explanation of the Honourable Member for Kota Kinabalu about forestry in Sabah.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Under the RSPO

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

I want to correct...

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Because palm oil...

Datuk Dr. Marcus MojigohUPKO · BNPutatan

...Boleh?

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota Kinabalu

Nanti, nanti...

Datuk Dr. Marcus MojigohUPKO · BNPutatan

Saya perbetulkan...

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

Hey-hey, wait, I am asking for that time.

Datuk Dr. Marcus MojigohUPKO · BNPutatanEN

...That is why it confuses the House.

...How does it confuse the House?

Datuk Dr. Marcus MojigohUPKO · BNPutatan

Boleh?

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

Okay, okay, give me one second, ha... [Looking at the wall clock in the Chamber] Cannot, cannot... [Chamber in uproar] With the implementation of the Roundtable Sustainable Palm Oil (RSPO), an...

Tuan Julian Tan Kok PingDAP · PRStampinEN

Honourable Member for Putatan, please sit down.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Of Benta Wawasan this cannot be certified under the RSPO because the palm oil is produced from forest reserves. This will have a negative impact on the reputation of the Sabah palm oil industry, where our palm oil products may be boycotted...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, time is up.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Or Datuk Sam Mannan wins...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Masa cukup.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...Will Datuk Sam Mannan take responsibility for these losses? I ask Datuk Sam Mannan to resign because of these scandals...

[Dewan riuh]

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

Apart from that, I was also told that while the state government gazettes more plantation land as forest reserves in the name of conserving forests, at the same time many forest reserves have been converted into oil palm plantations. Is this not contradictory, and a dual-system? I believe the forestry department uses such dirty tactics to enrich certain companies by gazetting forest reserves to them.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

Meanwhile, the government uses the reason of forest conservation to seize the land of poor farmers and make it a forest reserve, Mr Chairman. This is very serious...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Member for Kota Kinabalu, that's enough.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...This is very serious. The government must- since this problem is very serious, it must give an explanation. Mr Chairman, this is serious, let me take one second...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

How can- hey, hey, to the Speaker like this. Enough, sit down.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

...A little more, one more minute.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Cukup, cukup.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota Kinabalu

...Adalah...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Please sit down, Honourable Member.

Tuan Wong Sze Phin @ Jimmy WongDAP · PRKota KinabaluEN

[Speaking without using the loudspeaker]

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Member, please sit down. I invite the Honourable Member for Sik. Yes.

Assalamualaikum, thank you, Mr Chairman. I would like to continue to touch on Item 13900 and also Item 16700. For the Sik parliamentary constituency, flood incidents often occur involving Sungai Ceper when continuous heavy rain falls in the upper reaches of the river, caused by several factors such as the narrow and shallow river regime, the winding river regime, obstructions in the river, and back flow from Sungai Ceper downstream. Apart from that, the problem of bank collapse, overflow of water entering private crops that damage structures and crops, as well as sewage from village residential houses discharged directly into the river, also contribute to the problem of the river flow being blocked. These floods also affect residential areas and paddy field agricultural areas around Kampung Kemelong in Pekan Sik as far as Kampung Tanjung Besar in Pekan Batu Lima, with damage that has to be borne each time a flood occurs. Every year, these flash floods occur two to three times when heavy rain falls. The residential houses located across the river face the problem of cut-off access roads from the village area to the main road of Sik, Gurun. Therefore, Mr Chairman, to overcome the problems raised, my constituency requests the Honourable Minister to approve the allocation under Item 16700 for the Urban Stormwater Management and Flood Mitigation project, to carry out widening, deepening and straightening works on Sungai Ceper over a length of 20 kilometres, and also to allocate under Item 13900 – Flood Warning and Control Plan so that the implementing agency under the Ministry of Natural Resources and Environment (KASA) can install several flood warning equipment that can detect floods early at Sungai Ceper, so as to help the residents around take safety measures earlier. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Here, do I give the floor to the Honourable Member for Pokok Sena or the Honourable Member for Bukit Gantang?

Datuk Mohd Idris bin JusiPKR · PRBatu Pahat

[Bangun]

Tuan Er Teck HwaDAP · PRBakri

[Bangun]

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Bukit Gantang first lah.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Member for Bukit Gantang? Please, Honourable Member for Bukit Gantang.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Assalamualaikum and thank you to Mr Chairman. I want to speak about P.23, Item 15400, namely the Environmentally Friendly River Drainage Management Plan. I want to touch on something in my area, a tributary whose name is- its spelling- J-a-n-g-e-e [Spelling the word] at Kampung Dew. There is a habitat area for fireflies there bordering the Bagan Serai Parliamentary constituency, and now we can see how- I went there, rode a sampan to see how the condition of the fireflies, which have already been disturbed, because the area is among the greatest firefly areas apart from the one in Kuala Selangor. One reason is that there is a prawn pond there. I am also puzzled how a prawn pond was given to a cooperative owned by some UMNO leaders in the Bukit Gantang area, not far from the prawn pond, where at night lights are installed there. If it is based on that, it disturbs the life of the fireflies, and these fireflies are also dangerous, especially they will damage the flora and fauna there. Therefore, I hope the ministry will take care regarding this, and how an investigation must be done. How can that pond operate so close to the firefly area in this Sungai Jangee just now. Secondly, regarding- referring to B.23, Item 60000, we ask that NGOs be made clients of the Ministry of Natural Resources and Environment. It is strange, indeed, the ministry should make one of its clients NGOs that fight for natural resources and the environment. If we look at the Ministry of Women, one of its clients is non-governmental organisations (NGOs). The ministry that should cooperate well with environmental NGOs, such as Sahabat Alam, Persatuan Pengguna Pulau Pinang, and the Association of Nature Lovers around Malaysia, which have contributed greatly to protecting this environment, should not be like this. Suddenly, when we look at the budget report and the clients of this ministry, there are none, namely regarding the absence of any NGO as one of the clients. Thirdly, everything that needs attention, namely the budget relating to water, management- regarding the budget related to natural resources and the environment, P.23, Item 15000, namely the JPS allocation should indeed be given a lot. Usually we face floods, including in the area of Kuala Krau perhaps and the whole- hold on, a little, a bit more.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

I need extra time...

Tuan Idris bin Haji AhmadPAS · PNBukit Gantang

Apa nama...

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

This is because we always go and meet JPS, and among the answers is that the budget is insufficient. Therefore we hope, this year it is suddenly reduced rather than increased. Previously we saw the allocation was RM15 million, and this year it is suddenly reduced by RM13.5 million only. It should be increased because the population is growing and there are more and more rivers. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

I already promised earlier that at 4 pm the Honourable Minister would reply, so it's fine to interject.

Dato’ Ikmal Hisham bin Abdul AzizBERSATU · PNTanah MerahEN

Give Tanah Merah the last chance. Can Tanah Merah be last?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Minister, can the Honourable Minister take one hour to reply?

Dato’ Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · Mambong

Boleh, boleh.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, okay. Please, please. Honourable Member for Sibuti. At 4.30 pm, the Honourable Minister will reply.

Thank you, Mr Chairman. I want to debate B.23, Item 15000, Item 15200 and Item 15100 relating to cleaning and beautifying rivers. In my area of Sibuti, most rivers are surrounded by oil palm plantations. So, the flow of all palm waste, from fertiliser residues and whatever else, will flow into the rivers. So river cleaning is necessary, because most aquatic life in the rivers, such as prawns, fish and so on, obtained by inland fishermen, such as by casting nets and fishing prawns, will be eaten by their families, and the school children will eat what remains of what these fishermen obtained. What we fear is that if the river cannot be cleaned, the food becomes toxic in our children's bodies, so all kinds of diseases will harm our children at school later. Therefore, river cleaning in my area, such as in Kampung Bekam, Kampung Bekenu, and the surrounding areas, really needs to be done by JPS so that the rivers are always clean. Why is this allocation of more than RM1 million, and also the allocation for cleaning rivers at JPS, RM13 million, cannot be channelled to departments to help us? Previously, the Ministry of Natural Resources and Environment approved river cleaning for our rivers in 2012, but that allocation has not yet been released. We hope what was promised can be carried out in 2015 coming up. [The Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) chaired the Committee] Coastal erosion. Just a little more, Mr Chairman. Erosion of the coastal road, the coastline from Bekam to Tanjung Bunga, now needs large stones in cages to prevent beach erosion, so that the beautiful beaches do not damage the coastal roads from Miri city to Bekenu and Niah. That's all, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

I need to check first who has spoken and who has not yet. Yes, Honourable Member for Pokok Sena.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, did someone call the Honourable Member for Raub earlier?

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok Sena

Tidak, tidak.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Not yet? Okay.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

B.23 - Ministry of Natural Resources and Environment. Item 050000 – Forestry, and Item 060000 – Environment.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Earlier, PAS spoke. Never mind, continue, Honourable Member.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Already called, Mr Chairman, cannot withdraw [Laughter]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes. No, the Honourable Member should have told me, given me the info.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Yes, yes. Okay. I wish to rise regarding the incident that happened in Cameron Highlands recently. Based on the statement of the Right Honourable Deputy Prime Minister, who said that a thorough investigation will be carried out if there is any element of corruption involving individuals with interests in the illegal clearing in the hill resort concerned. "We are not worried", said the Deputy Prime Minister, "If they are proven to be the masterminds in this case, we have to take action. It doesn't matter whether they are protected by politicians, palace people or people from Singapore. There is no forgiveness for them." So, I was rather shocked by the statement of the Right Honourable Deputy Prime Minister. I think that the statement was not based on assumption, there must be hints of information conveyed to him, moreover when he mentioned the involvement of Singaporeans, foreign citizens who seem to be giving protection to certain parties, making it difficult for the forestry authorities and also the state authorities to take action against them. I believe that certainly the ministry, especially in this forestry division, has information. So that is why I want to ask for an explanation from the ministry, to what extent the Deputy Prime Minister's statement proves that this is what has become the difficulty for the ministry, the government, the Forestry Department in enforcing rules and laws to prevent illegal clearing from happening again. For me, Mr Chairman, certainly sometimes they bring letters from certain parties or calling, telephone calls, to the forestry enforcement division, which causes them not to be able to take action against these illegal settlers. So that is why I request, because this statement is very serious as it was said by the Deputy Prime Minister, namely, "Protection from politicians, palace people and Singaporeans". This is quite a heavy statement when three parties, namely politicians, palace people and also foreigners. So, I request...

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Honourable Member for Pokok Sena.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok Sena

Ya.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala Krai

Tuan Pengerusi.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Ya.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

I think he brought that letter, but the letter is not a guarantee [Laughter] Not a guarantee, that letter is only support but not a guarantee. Like the Deputy Finance Minister said.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok Sena

[Ketawa]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, that's out of the item.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok Sena

Ya?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Keluar Butiran.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

No, not out of order.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That interjection is out of the item.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Yes [Laughter] It's alright. So that is why I think an explanation from the government is necessary. Second, also related to the environment, namely related to the report of the Auditor General's Report on the privatisation programme for air quality monitoring and environmental data management given to a joint venture company between a local company and a company from Canada, named as Syarikat Alam Sekitar (ASMA). Alam sekitar, finally got asthma [Laughter] This company itself has problems.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

So I want to get an explanation because from this audit report it is said that the review certificate from the Attorney General's Chambers found that there are terms in the concession agreement between the government and ASMA that are not favourable and do not protect the government's interests, involving aspects such as data security, subcontracting, integrity, transparency, relations between parties, and the imposition of penalties. Whereas the amount the government has paid to ASMA through this concession agreement made for a period of 20 years is RM329.10 million. So I want certainty about who advised the ministry in preparing the terms of the agreement, which were finally said by the Attorney General's Chambers to be not favourable to the government. This is because I understand that usually there must be representatives from the Attorney General's Chambers, legal advisers at the ministry or at the department, and so on.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

So in the preparation of this agreement, this shows- another thing shows that agreements that are very unfavourable, for example the PLUS highway agreement and so on, which really are not favourable to the government and also not favourable to the people. This is the same because the government's interest is the people's interest. So I request an explanation of what has been mentioned in the latest Audit Report that has been tabled to us. Lastly, Item 080000...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, you have already, five minutes only.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Lastly, 080000 – Irrigation and Drainage. I want to get an explanation from the government, especially regarding the project of deepening rivers, particularly the river from Padang Terap to the Pokok Sena area, down to Alor Setar and so on. So far, how many times has this river deepening programme been carried out and the floods continue until now? I am very worried if heavy rain floods happen at Padang Terap. I phoned my friend, the Honourable Deputy Minister; if he says there is flood, I will wait, because the water will flow down to the Pokok Sena area. So I want to ask, especially recently, in villages located on the riverbank or near the river, they often face problems when floods hit their areas during the heavy rain season. Also, lately, this is the last point on this matter...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, there are still many Honourable Members.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

That is, to what extent the government and the ministry cooperate or coordinate with local authorities (PBT), especially because the floods now are no longer only in villages but in urban areas and housing estates. It seems to me the irrigation and drainage master plan can no longer be used. If, because of development projects, too many housing estates have been built which cause water not to be able to flow out, and I see that many PBTs, the Deputy Minister in charge of PBT is also here, many PBTs that do not take these issues into account at all when approving housing projects, for example. I myself experienced it in the housing area where I live. Meaning, we buy, but where do we read the plan? Nobody who buys a house reads the plan. Even architects themselves, they buy a house and do not read the plan. The Honourable Deputy Minister too, if he buys a house, does not read the plan, but when we sit down, suddenly the drainage water cannot flow out. So to what extent does this ministry look at it from the perspective of the master plan? I see this master plan is no longer relevant, it is outdated, and a new master plan needs to be made to ensure it suits the very rapid housing projects. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes. Thank you, Honourable Member. Honourable Member for Tanah Merah.

Dato' Ikmal Hisham bin Abdul AzizBERSATU · PNTanah MerahEN

Finally, thank you. Thank you, Mr Chairman. Here I also wish to take the opportunity of the five-minute slot, inshaaAllah, if there is time during the debate, to touch on item 060000 – Environment, relating to item 060300 – Monitoring and Enforcement. I know many have already raised this, but I also want to touch on it. I know that recently we were shocked for the second time in two years by the tragedy of landslides and mudflows in Cameron Highlands. I will address it from a different angle. Whether we like it or not, we must acknowledge that all of this happened because of human greed, which has damaged the environment as it pleases. Before I elaborate further on tragedies such as the one in Jerantut and others, I would like to remind us of the words of Allah SWT in Surah Al-Anbiya, Verse 31, which means, "And We have placed in the earth firm mountains lest it should shake with them, and We have made in it broad pathways so that they may be guided." Allah SWT also says in Surah An-Naba', Verse 67, which means, "Have We not made the earth a resting place, and the mountains as pegs?" The facts contained in these verses are indeed consistent with modern geological science, which recognises the importance of hills and mountains as pegs, or stabilisers, of the earth against any shaking from landslides and earthquakes. In addition, the new focus of scientists in the fields of geology and earth studies has also found that hills and mountains indeed have roots that extend much deeper into the earth than their peaks. This was explained by Raymond Siever, a world-renowned earth scientist. The vast earth has various major components that complement the arrangement of this universe. Among the components that are important to the existence of this world is the form of the earth's surface, with its hills and mountains. It cannot be denied that the existence of hills and mountains around the world has specific functions for the stability of nature. Among the functions of all hills and mountains is to stabilise the earth against any shaking. In fact, it is not only in Cameron Highlands; in Kelantan, in the Lojing area of Gua Musang, hills are also completely quarried. For this reason, earth scientists and geologists recommend that hills and mountains not be disturbed in order to protect the stability of the natural ecosystem. The incidents that occurred in Cameron Highlands and several similar areas before this are proof of human craving for the functions of hills and mountains. Our eagerness to pursue development and carry out projects without regard to the arrangement of the natural ecosystem has invited various natural disasters. I acknowledge that the government, through the Ministry of Natural Resources and Environment and the local authorities, has set specific guidelines that must be complied with regarding development projects in high-risk highland areas. This measure aims to ensure the well-being of nature and the sustainability of humankind. However, unfortunately, we are often negligent until eventually we invite disaster. The same is true of what happened in Cameron Highlands recently. The greed and negligence in ensuring that the environment is not destroyed arbitrarily for commercial purposes were ignored. Imagine us being exposed to the facts of how serious illegal land clearing occurred in the highlands, causing the environment to be severely affected, just as happened in Lojing in Gua Musang, Kelantan. Therefore, I wish to urge the Ministry of Natural Resources and Environment, on this occasion, to truly take seriously what has happened in Cameron Highlands and also the highland areas elsewhere. Now is not the time to adopt the attitude of "only tilting the head after being hit," because what Cameron Highlands has experienced has put its residents in danger.

Dato' Ikmal Hisham bin Abdul AzizBERSATU · PNTanah MerahEN

Therefore, stricter enforcement must be carried out to ensure that those who carry out illegal land clearing are punished to the fullest extent. We must take such land clearing seriously because these are the destructive creatures who will destroy the environment. Caning, I repeat, caning, as proposed by many parties including the Malaysian Anti-Corruption Commission (SPRM), must be seriously considered. I urge the Ministry of Natural Resources and Environment to bring the existing amendments to the Attorney General's Chambers for review. Mr Chairman, I support caning any Member of Parliament who does not follow the rules. [Laughter] We cannot allow illegal land clearing anywhere, one that is started by Honourable Shah Alam, sorry. For that reason, integrated operations to eradicate this practice must also be conducted from time to time. I am confident that if inspections and enforcement are carried out thoroughly at all times, many more illegal land clearings can be detected. Mr Chairman, I would like to touch on item 050300 – Forest Development. I urge the Ministry of Natural Resources and Environment to ensure that the Forestry Department throughout the country is more efficient and proactive in carrying out enforcement so that logging does not occur on a widespread scale. We are often exposed to how those who obtain permits to cut trees and timber permits often violate the permits given by logging beyond the permitted areas. For example, in Kelantan, I hope the state government, my representative Pasir Putih, please, do not give logging permits at will without control. There are companies that were given ten hectares but logged 20 hectares. Have compassion for the many areas from Gua Musang, Kuala Krai, including Tanah Merah, such as the State Assembly seat of Gua Ipoh, my area, where nearly 2,000 residents still drink river water, flowing water, as Honourable Jerantut said earlier, the water has become muddy, it has become "teh tarik", it is no longer suitable. In other areas there may be treated water, but village residents still drink water from the rivers. So I hope enforcement can be taken.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Can you finish, Honourable Member?

Dato' Ikmal Hisham bin Abdul AzizBERSATU · PNTanah MerahEN

Okay, I will make it short. I do not intend to make accusations or slander, but it is often linked to the lack of integrity of a handful of officers and staff of the Forestry Department who collude with parties that violate the law. Therefore, it would not be an excessive action if an investigation is also carried out to ensure that no officers or staff of the Forestry Department are ready to do so. If there are, take immediate action before it is too late.

Dato' Ikmal Hisham bin Abdul AzizBERSATU · PNTanah MerahEN

Mr Chairman, I wish to conclude this debate by reminding everyone that environmental issues are not trivial. Land clearing is not a minor issue, and cutting trees without permission is not an isolated matter. With the power that is held and through the provisions of the law, then use it to the best possible effect. Therefore, remember that when hills and mountains are increasingly stripped and quarried for development and commercial purposes, the stability of the land will be threatened and more natural disasters such as earthquakes, tremors and landslides will occur. Finally, this is in line with the wrath of Allah in His words in Surah Al-Rum, Verse 41, which means, "Corruption has appeared on land and sea because of what the hands of people have earned, so that He may let them taste part of what they have done that they might return." Thank you. Tanah Merah supports.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Raub.

Thank you, Mr Chairman. Ministry of Natural Resources and Environment, Head B.23, item 050000 / 050200 – Forest Operations. This year, 2014, once again Cameron Highlands has made the news and publicity, with permission, for the wrong reason. In 2013, a dam burst resulting in property damage and loss of life. This year too, mudflows and flash floods resulted in destruction of property and loss of life. So I see under this forest operations head, the 2014 Budget is RM12.2 million. This time it has gone down. So I want to know how we read the ministry's seriousness in monitoring to ensure forest resources in Peninsular Malaysia are managed, conserved and developed so that timber and services are produced continuously and stability is maintained. So according to research by botanists, one mature tree can absorb and hold 40 gallons of water. Imagine how many thousands of trees have been stripped in the Cameron Highlands area, which caused water to rush and surge into the lowlands to destroy property and take the lives of people there. So I request that the ministry take more serious attention to work together with the state government to monitor illegal logging that is carried out on a widespread scale. We heard earlier how the Honourable Pokok Sena described the warnings and statements issued by the Honourable Deputy Prime Minister, and I also received an SMS from a person claiming to be the Menteri Besar of Pahang, saying that in the matter of forest logging his hands are tied, he cannot do anything. So it seems to me that there is a greater power restraining the Menteri Besar from implementing policies to protect our forests. So we must help the Honourable Menteri Besar in his seriousness to protect the nation's treasure, namely, what is particular, with permission, protecting our forests. In 2004, when I was in the Pahang State Legislative Assembly on that side, I proposed to our state government that we ban the felling, collection and extraction of forest trees by the private sector, except that the felling and collection of timber and logs be carried out by contractors appointed by the state government. In that way we bring all forest products to a bounded area, and we place the timber there. Everyone in the logging industry can buy timber there, and we help the state government so that it does not lose out. Earlier we heard of someone given an area of 10 hectares who logged 1,000 hectares. So if the private sector is prohibited and banned from logging, we can reduce illegal logging and theft activities, and when all industries involved in the logging and timber industry buy logs from the bounded area, they pay tax at that time and the government can maximise tax collection. So once again I call on the ministry to take seriously the appeal from the person who claims to be the Menteri Besar, read together with the statement issued by our Honourable Deputy Prime Minister, and help my state government, Pahang, to preserve the nation's forest treasures. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Parit.

Thank you, Mr Chairman. I refer to the water flow and drainage, head 14800/14900. I wish to inform that in my area there are about 3,000 acres of paddy fields and there are five irrigation schemes, namely Bota Kiri, Kampung Aji, Bota Lambur, Parit Senin, Lambur Kiri. The problem is that water cannot be channelled to the paddy fields. This situation occurs because of the drop in the water level of the Perak River below the minimum operating level of the pumps, which has caused the planting schedule to be affected and forced to be postponed because the existing pumps cannot operate as usual as they are below the minimum operating level of the pumps that should be.

The Department of Irrigation and Drainage (JPS) has been forced to supply mobile pumps to ensure water supply to farmers, and the department has to bear additional costs for the operation and maintenance of these pumps. The causes or problems that are often faced are: (i) the existing pump system was built before the hydroelectric dams in Upper Perak were built, and when completed the minimum operating level of the pumps had changed; (ii) water could not be supplied to farmers according to the proper schedule because the existing pumps could not operate as they were below the minimum operating level of the pumps; (iii) JPS has been forced to bear additional costs for the operation and maintenance of the mobile pumps installed to ensure water reaches the farmers; and (iv) farmers have had to bear losses because the paddy planting schedule had to be postponed. For that purpose, I propose the following: (i) upgrading the existing pumps as I mentioned earlier, namely lowering the intake of the existing pump house and replacing the existing pump system; and (ii) building a weir or inflatable rubber dam at the last downstream intake, namely at Teluk Seno, to raise the water level in the Perak River. Mr Chairman, this problem actually occurs often, especially in 2014, and the people or farmers constantly raise this matter. So I hope that with the replacement and improvement of the existing pump system, inshaaAllah the government's efforts to increase farmers' yields to at least seven tonnes per acre can be implemented. So Mr Chairman, I ask JPS or the ministry to give attention to the grievances and appeals of the people of Parit who have borne heavy impacts all this time. Thank you.

Mr Chairman (Datuk Seri Ronald Kiandee)EN

The Honourable Member for Sungai Petani, after that the Honourable Minister will respond. Less than five minutes, Honourable Member.

Dato' Johari bin AbdulPKR · PHSungai PetaniEN

Thank you, Mr Chairman. I only want to raise two matters. Firstly, regarding what the Honourable Pokok Sena raised earlier. If we look at flash floods now, not only are there flash floods in areas outside the town, but also many flash floods occur within town areas. So the question now is, to what extent is the ministry cooperating with the Ministry of Urban Wellbeing, Housing and Local Government to discuss how a regulation can be drafted for all local authorities (PBT), so that any new development must follow new methods and also new regulations.

Dato' Johari bin AbdulPKR · PHSungai PetaniEN

If we look at developed countries, before urban areas are allowed to be developed, they have either large drains or large water retention areas. So all water coming out of these residential areas will be channelled to these large drains. Look at Los Angeles earlier, Dubai, Hamburg, they all have them, but our state does not. When a development order is submitted and a development order is approved by the PBT, then it only takes care of a very minimal area for the discharge of its water.

Dato' Johari bin AbdulPKR · PHSungai PetaniEN

In the end, every one of these residential areas discharges water to a place which is actually on the road, that is the final story. On the road, this becomes a drain. Like in Sungai Petani, there is a place, Mr Chairman, named Taman Keranji. Next to Taman Keranji is Taman Keladi. Taman Keladi, JPS built a large pond. This pond is intended to arrest all the water around it, but when there is no connection of drains to channel water into this pond, eventually the road returns, the road becomes a river. So in the end when it rains, not only is there flooding, but the road will also be damaged. Finally, Mr Chairman, in this one minute, I want to look at the environment as well. We want to ask the ministry, is the current haze a locally manufactured haze or are we importing it? Because I see that open burning is currently rampant. Recently we saw it in the KLIA and KLIA 2 areas, openly, even though there are parties who say they are working on it. But there was also a time when the former Prime Minister sent our fire brigade team to help Indonesia for days. They went to help them, but when we are on fire, the fire brigade cannot do anything. So Mr Chairman, leaving one. That is one example. I also want to know, how many more PBTs are still dealing with and solving the rubbish problem through open burning? Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Thank you, Honourable Member, please, Honourable Minister. The Honourable Minister may manage the reply until 5.30 pm, Honourable Member.

Dato' Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

Mr Chairman, I extend my thousand thanks to our colleagues who touched on many issues related to the Ministry of Natural Resources and Environment. If I were on that side, I would touch on much more...

[Dewan Riuh]

Dato' Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

Perkara-perkara dan isu-isu yang seharusnya ditangani oleh kerajaan. Memang betul Ahli-ahli Yang Berhormat. Pertamanya, Honourable Member Silam, yang menyebut rancangan tebatan banjir di kawasan beliau, mana yang sudah boleh dibuat, mana yang belum dibuat. Kalau kita tengok peruntukan untuk rancangan tebatan banjir di Sabah RM20 juta untuk tahun 2015. Bayangkan RM20 juta untuk apa, cukupkah tidak cukup? Oleh itu, Ministry of Natural Resources and Environment melalui Department of Environment sememangnya menyampaikan senarai projek-projek ke EPU untuk kelulusan. Jadi yang diberi kepada kita macam inilah. Sama ada ia mencukupi atau tidak mencukupi, itu memang susah sangat sebab kita perlu menggunakan peruntukan yang sedia ada. Oleh itu Honourable Member Silam, saya amat prihatinlah kepada Honourable Member Silam yang menyentuh rancangan tebatan banjir di kawasannya. The Honourable Member for Hulu Langat menyentuh mengawal tadahan air. Sememangnya kawasan tadahan air amat penting kepada kita. Kalau kita yang pertamanya, tidak mewartakan kawasan tadahan air di satu lembangan sungai, maka sungai itu kita boleh guarantee ya ia akan tercemar. Oleh itu, mewartakan ini amatlah penting supaya pembangunan tidak dibuat di kawasan tadahan air. Maka yang disebut tentang maklumat geo special ataupun geospatial data ini adalah penting untuk kita. Geospatial ini kementerian mendapatkannya sama ada dari Remote Sensing Department ataupun kita memperolehnya dengan membeli dari luar negara yang data geospatial ini ataupun maklumat geospatial. Ini satu perkara yang saya ingin memaklumkan amat penting untuk pembangunan negara dan untuk pelbagai aktiviti-aktiviti yang tidak diluluskan oleh kerajaan kerana ini kita nampak gambar dari atas seperti Geographical Information System (GIS) ataupun gambaran remote sensing dan sebagainya. The Honourable Member for Hulu Langat juga...

Tuan Er Teck HwaDAP · PRBakriEN

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Bakri is standing up, Honourable Member.

Tuan Er Teck HwaDAP · PRBakriEN

Honourable Deputy Minister. Bakri wants to ask a question regarding water retention.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Wait, wait. I have not got to that yet, Honourable Bakri.

Tuan Er Teck HwaDAP · PRBakriEN

Bakri did not get to ask a question, he made a speech. He wants to ask a question.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

He wants to ask a question, what is it?

Tuan Er Teck HwaDAP · PRBakriEN

Okay, thank you Mr Chairman and Honourable Deputy Minister for giving Bakri the opportunity to ask a question. Here I want to ask the Honourable Minister, referring to whether what was stated by the Deputy Prime Minister on 21 October 2014 at the 9th National Water Resources Council Meeting, that RM9.3 billion is needed to solve the flash flood problem in 102 towns and villages throughout the country. I ask the Honourable Minister to explain how much of the allocation has already been used...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That's like debating, Honourable Member.

Tuan Er Teck HwaDAP · PRBakriEN

No, I am asking a question.

Okey.

Tuan Er Teck HwaDAP · PRBakriEN

...For the purpose of the flood prevention plan that is needed.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Many of our friends earlier touched on this matter. When I arrive, I will mention how much allocation is needed and the research studies that have already been done by JPS?

Tuan Khalid bin Abd. SamadAMANAH · PHShah Alam

[Bangun]

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Mr Chairman, Mr Chairman. A brief clarification. Honourable Minister.

Manakah?

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

The Honourable Member for Hulu Langat.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

The Honourable Member for Hulu Langat. This is not yet the Honourable Member for Hulu Langat.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

No, regarding the geospatial just now, why do we have to depend on foreign countries? We don't have our own facilities? Thank you.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Honourable Member, because of this geospatial, geospatial information and geospatial technology. Our satellite up there does not exist and is not efficient enough to take pictures using a hyper spectral camera. Because what we need now is also in 3D form, 3 Dimension, pictures or images in 3 Dimension. Therefore, we also need to buy from foreign countries such as from SPOT. Now SPOT belongs to France. Its resolution is 1.5 metres now.

Tuan Julian Tan Kok PingDAP · PRStampin

[Bangun]

Dato' Dr. James Dawos MamitPBB · BNMambongEN

So this gives the most detailed image in this matter.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Honourable Minister, may I ask about the Honourable Minister's satellite.

Siapakah itu?

Tuan Julian Tan Kok PingDAP · PRStampin

Stampin.

Okey.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Just now the Honourable Minister said we need satellites, special satellites. Why is it that our RazakSAT 2 and number 1, the satellite that was launched, has an ordinary camera? Would it not be better to launch a satellite with a sensor that can detect what the Honourable Minister needs to use? Thank you, Mr Chairman.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Our RazakSAT satellite can also take pictures of areas that...

Tuan Julian Tan Kok PingDAP · PRStampin

Sudah gagal.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

...Large. The resolution is not very detailed. What we want for planning now is a detailed resolution. If it can take an image from above, 1.5 square metres, we can even see our house toilet.

Tuan Julian Tan Kok PingDAP · PRStampinEN

I agree. So let us just cancel the RazakSAT programme.

Dr. Ong Kian MingDAP · PHSerdangEN

Better to use Google Earth, Minister.

Don't tell us to say cancel. That is what helps us. If the government's money is plentiful, we would do even more than that. This is because we follow the development and progress that the world makes, we follow it. But this is an allocation; if we have the money, we do it, we do everything. Next, the Honourable Member for Hulu Langat also touched on minerals and geoscience.

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

Honourable Minister, earlier the Minister mentioned the matter of water catchment areas, how important they are and that they need to be gazetted and so on.

Why, when I mentioned it earlier, did you not stand up?

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

I wanted to come in, but others had already stood up. I stood up earlier but did not get the chance. We don't know if there is a time limit. Is there a time limit?

Ask Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Do you want to give way, Honourable Member?

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

I just want to know, to what extent has the mapping and gazetting of these water catchment areas been and is being carried out?

This is indeed carried out by the states because this is the states' responsibility. Every state has its own water resources council. So this is their own responsibility. However, there are also states that do not do it. So if they do not do it, under the law. If there is legislation that requires us to gazette, then we gazette the water catchment areas.

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

So the overall monitoring is not carried out by the Federal Government. If there are states that do it, alhamdulillah. Then the Centre sees it and the Centre considers, good, the state has done it. So, so far in our whole country, according to the monitoring carried out by the Federal Government, to what extent have these water catchment areas been identified and already gazetted or already gazetted, and protected from development projects? Is it an ongoing process or has it already been identified and all the data is complete? What is the status now?

Honourable Member, some have already been identified and some have already been gazetted. However, this process is ongoing. What is important is that it is ongoing so that rampant development does not happen and is not controlled anywhere. So this is what relates to land development and so on. Okay, Honourable Member?

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

How many percent would you say, currently? Now? What percentage has been completed? What percentage is still needed? Which states have done it? Which states have not? Can the Minister provide it in writing? Thank you.

Okay, if the Honourable Member wants it in writing, because these are statistics, specific figures, I will provide it in writing. Remember this, Honourable Member?

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

Thank you. I don't expect you to answer now, because this matter is all figures, figures. Thank you.

Yes, state the figures now, how can I remember many figures? Thank you, Honourable Member. Next, the Honourable Member for Hulu Langat who touched on new minerals. The new minerals, in fact, the metallic minerals that have been identified in our country are indeed 22 metallic minerals in total. Not metallic minerals, there are 21 that have been identified. Whether they are new or not, we have nothing new. Only the 22 metallic minerals, and the 21 non-metallic minerals, are those that have been identified. However, the mining industry for metallic minerals depends on the quantity of minerals in an area. Whether it is economically feasible or not? So, that is how it is. Also, the environmental research that was raised by...

Dr. Che Rosli bin Che MatPAS · PRHulu Langat

Tuan Pengerusi.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Hulu Langat is standing.

Yes, the Honourable Member for Hulu Langat.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Add a little, Honourable Minister. Is it true that I was informed that gold and uranium can be found in Kelantan? Thank you.

Gold and uranium. Gold is indeed present in Kelantan, but it has not been mined yet because its reserve is small. So economic feasibility is perhaps low. However, uranium has not been confirmed yet. Uranium has not been confirmed yet because uranium is in small amounts, traces indeed exist in the old retailing tin mines. This is monazite. These are indeed only traces. So those are only traces that are not dangerous and need not be used, the amount is too small. Environmental research. This is a method for environmental protection. Environmental research is indeed continued and carried out by the Department of Environment. What is important is that our environment is changing, Mr Chairman. Therefore, this research is very necessary. We want to know what impact development carried out in an area has. For example, look at Kuala Lumpur, where the environmental quality is, whether it is high or low? Therefore, if development is too rapid, then our environmental quality in terms of air quality indeed declines. In hot weather, when we walk on the road, anywhere, because there are too many vehicles, we get short of breath. Even though our hearts are healthy, we do not have heart disease, but we are short of breath. This is because of ozone. This is what makes us short of breath. Ozone is also what causes severe air pollution.

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Putatan, Honourable Minister.

Okay, the Honourable Member for Putatan, please.

Thank you, Mr Chairman. On the matter of climate change, global warming. What the Honourable Member raised is the situation in cities, the emission of carbon dioxide from factories and from vehicles.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, we have not yet reached that issue, Honourable Member.

This is leading to this. Research on climate. So, what about the review or research on coral bleaching in Malaysia, Pulau Batam and so on? Changes in weather that cause sea levels to rise and many of our plants on our coasts have already been damaged. So, what efforts is the government making to replant the trees that should protect our coastline? So, if we look at my area Mr Chairman, many of the lands along the coast have already been damaged by wave battering and so on. How far has the government progressed in the details the Honourable Member mentioned earlier?

Tuan Julian Tan Kok PingDAP · PRStampinEN

This is related to the Honourable Member for Putatan. Research, Honourable Minister. Can?

This is environmental research.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Environmental. Research. This is related to the Honourable Member for Putatan.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Do you give way, Honourable Member?

Tuan Julian Tan Kok PingDAP · PRStampinEN

Can, right? Just a moment, only 30 seconds. Can? Speak yes...

15 saat.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Okay, can. Thank you, Honourable Minister.

Dato’ Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

I am looking at this clock from now, 15 seconds.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Yes, now [Laughter]. I want to ask for the views of the Honourable Minister. Referring to research papers and studies by international scientific experts, I want to ask for views: has this global phenomenon reached the point where it cannot be avoided? So, if a drastic action is not implemented by the ministry, flood incidents will certainly get worse year after year. This is clear from what happened in Kuantan, Johor, and, Honourable Member, our area, Kuching. It is getting worse in areas such as Batu Kawah, Tabuan Desa, Tabuan Jaya and Stakan and many more. So, in a response from the Honourable Minister that the flood mitigation incident, with permission, will only be completed in 2017. This is too long. By then Bintulu may already be submerged. As a temporary solution, I suggest working with the Municipal Council, and if possible pressing them to deepen and upgrade the drains, where in some areas in our area drains have not been maintained for 20 years. So I ask for the views of the Honourable Minister, what is the Honourable Minister's view on the global warming study that has reached a point where it cannot be avoided? Thank you, Honourable Minister.

Thank you to both of these friends, the Honourable Member for Putatan and the Honourable Member for Stampin. Global warming, climate change, indeed cannot be reversed anymore, with permission. Even if we do nothing, we return to the stone age, no cars, no logging of forests and so on, it cannot be reversed anymore. It will keep rising and peak as a plateau, and only after 200 years can it decline, climate change and global warming. So, therefore, what we need to do in our country is the process of adaptation and mitigation. Because it is not only our country doing it. Our country only produces 0.6 per cent of green house gases. But China produces 28 per cent and the United States 15.5 per cent every year. So, this is what happens. It is not our country that does it, because air does not need a passport. It crosses borders, goes everywhere. So, this is the cause. This is because if global warming happens now, imagine by 2050.

Experts have already estimated that the sea level will rise by not less than 50 centimetres. But it will be more, not less than 50 centimetres. By 2050, because the rate of temperature increase in temperate countries is 5.6 degrees Celsius. Imagine in winter, when the temperature is 0, but with 5.6 degrees Celsius, the temperature will rise to that, 5.6 degrees Celsius. So, it gets hotter. When it gets hot, imagine near the North Pole, all the ice will become liquid. That is what makes the sea level rise. So, this is true. The coastal areas of the Honourable Member for Putatan will be submerged. Many areas will be submerged by 2050. Even now, some islands have already lost 10 per cent of their land to the rising sea level. So, what we do also with the flood mitigation plan is only temporary. But by 2050, in the 21st century, if there is even more rain, the sea level has already risen. Is the flood mitigation plan we have done enough? So, all of this is only temporary. Because as long as developed countries do not reduce the emission of green house gases into the air, this is the state of the world, including our country, Honourable Member.

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, the Honourable Member for Batu is standing, Honourable Member.

Next. Why did the Honourable Member for Batu not speak earlier, and now wants to stand up?

This is only to respond...

Kuala Nerus, Honourable Minister?

Hendak tanya...

The Honourable Member for Batu, your question?

The question is, if we hear from the Honourable Minister, it seems all these efforts are in vain. But in fact we are part of the panel to control global climate change. If the government takes this attitude, nothing will change. Then, what is the use of us still trying? Moreover, if the Honourable Minister says this only because of the green gas that has been emitted by developed countries, it is not necessarily so, because Asian countries are also responsible for a large part of contributing to this climate change. Thank you.

Thank you, Honourable Member.

Honourable Minister...

That is why every year, the world gathers together to discuss at the Conference of Parties on climate change. This year, it will be held in Peru in December. Until now, we have been based on the Kyoto Protocol. But the Kyoto Protocol ended in 2012 because developed countries in Annex 1 did not want to accept the Kyoto Protocol. So, we have lost that. So, how else can it be continued? Another proposal from the country of France, this is another protocol. Combining developing countries like us with developed countries. But I have not yet seen this draft. I also cannot comment. Nevertheless, the next steps of adaptation and mitigation in our country, we continue to carry them out. Reducing the emission of green house gases.

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kuala Nerus is standing, Honourable Member.

Honourable Minister, the issue of coastal erosion, Kuala Nerus.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Depan, depan Yang Berhormat. Right in front of you.

Silakan.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Do you give way to the Honourable Member?

Okay, thank you, Honourable Minister. The issue of coastal erosion just now, at my place in Tok Jembal. I have raised it in previous debates, and the Honourable Minister answered the issue rather briefly. What arises is that the coastal erosion occurring in Tok Jembal is due to land extension caused by the expansion of Sultan Mahmud Airport. The issue has been going on for a long time, and the latest effect mentioned recently is that a device belonging to Universiti Malaysia Terengganu on the side of Tok Jembal Beach just now has been damaged and collapsed due to coastal erosion. The issue that arises is that the solution the government has so far used is rock embankments, whose effect causes erosion to the area in front of it, the next area. It does not solve the problem. This issue has continued for a very long time, even though the government has started embankments from 2011 to 2014, and the problem is still not solved. So, I want to know, what is the best solution for the government for this issue? I have previously proposed using the concept of sand or soil embankments dredged from the sea, as applied in Corrinna for example, which only needs five months to solve the problem. However, we are nearly five years into the problem at Tok Jembal Beach. Thank you, Honourable Minister.

Thank you, Honourable Member, for raising that issue. We humans only think about developments for ourselves. However, the problem is that one development here will have a negative impact in another area. Coastal erosion, we make drawings, we build retaining walls and so on. We are merely shifting the problem to another area because of the literal wave or the direction of the waves, their course, and this will change when we do something physical like that, Honourable Member. I have seen, studied and researched this.

Honourable Deputy Minister, that is why the proposal we made does not use rock, but uses dredged sand to extend the beach, as done in Australia for example. That is an old proposal. It is not me who gave this proposal; this proposal was made by experts at Universiti Malaysia Terengganu themselves who have done research in this field.

This too, Honourable Member, however we build seawalls, we are only shifting the problem to another place as well. But we also do it whether using sand or soil. It can be used. What I said earlier was for the short term. Bigger problems will occur later due to this climate change. That is the problem...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat...

Sorry, Honourable Deputy Minister. I think it is a long-term study, because if sand is used as embankment to extend the beach, enlarging the beach, erosion will not occur in another place. It will save other places; this study has been done. The Honourable Deputy Minister's answer referred to the effect that would arise from using rock embankments. What I proposed is using sand embankments, enlarging the beach so that the beach can be used as a new recreational area. That is the proposal that was made.

I know that. There are other areas; in Rio there are even larger sand embankments. Why does erosion occur in Rio? Copacabana Beach. So we should not hope that it will not happen; it will continue to happen. As I said earlier, possibly 10 years, 20 years and so on, where our children and grandchildren are concerned. Therefore, sustainable development is very important, which we must continue to uphold. This is what we do, we really do it. What we do is temporary for our current generation. But for the generations to come, I do feel sorry for them. So this is a problem, Honourable Member. But thank you for raising the issue, I know. Next, this is still in Hulu Langat. This touches on the Forest Research Institute Malaysia (FRIM). What is the contribution of FRIM to forest development and forest management? In fact, the current forest management system is the result of FRIM research done long ago. Even so, there must be an international organisation, the International Tropical Timber Organization. This also creates a different system because changes keep happening. So our country adopts what has been studied and researched by FRIM and also what has been done by the International Tropical Timber Organization (ITTO), so that forest management in our country will continue to be sustainable or sustainable. The Honourable Member for Hulu Rajang touched on the drainage system in Kapit. The drainage system is the responsibility of Kapit Municipal Council, Honourable Member. However, Kapit Municipal Council also needs to liaise with our ministry so that we can help in the form of advice or in the form of physical projects if existing allocations are available, Honourable Member. Next, from the Honourable Member for Serdang, who touched on enforcement because of the source of this pollution. Enforcement is indeed carried out if pollution of rivers is done by the Department of Environment (JAS). However, even so, I often discuss with the Department of Environment; they say staff are still insufficient. So their enforcement anywhere only takes place during the day. But at night, as colleagues have mentioned, who dumps polluted materials into rivers, so this requires many more staff...

Dr. Ong Kian MingDAP · PHSerdangEN

Honourable Deputy Minister, Honourable Deputy Minister...

Mr Chairman (Datuk Seri Dr.Ronald Kiandee)EN

Honourable Member, not like that, Honourable Member. Do you want me to give way, Honourable Member?

Dr. Ong Kian MingDAP · PHSerdangEN

Serdang. I am the one who asked the question.

Mr Chairman (Datuk Seri Dr.Ronald Kiandee)EN

The Honourable Member for Serdang.

Yalah.

Dr. Ong Kian MingDAP · PHSerdangEN

Okay, Mr Chairman. Earlier I asked several specific questions about enforcement regarding the Taman Beringin Leacheat Treatment Plant, and I have also received a reply from the Department of Environment (JAS). However, when I sent people there, indeed no action had been taken. I hope the Honourable Deputy Minister can give a specific answer, not a general answer. Thank you.

The Honourable Member mentioned environmental enforcement just now. This is what I touched on. If the Honourable Member mentions Taman Beringin...

Dr. Ong Kian MingDAP · PHSerdangEN

Yes, yes, there is. I gave specific examples of Taman Beringin and also Forest City in Johor near Gelang Patah.

Mr Chairman (Datuk Seri Dr.Ronald Kiandee)

You cannot demand answer like that Yang Berhormat.

Okay, Taman Beringin, but I am following the Honourable Member's listing. The Honourable Member also mentioned air pollution. It is given to a private company to determine whether it is polluted or not. This is the company ASMA. So, it is this company that makes and measures air pollution in our country, and the information obtained is channelled to the Department of Environment (JAS) so that during haze, this information can be obtained by anyone who wants to know by calling the Department of Environment. Apart from that, the Department of Environment also issues this information in newspapers during haze. Next...

Dr. Ong Kian MingDAP · PHSerdangEN

Honourable Deputy Minister, I would like to add this from the Auditor General's Report, it is not me who said it, where this agreement between ASMA and the government is concerned. The Auditor General's Report says that Article 13.21 requires ASMA and the government to keep confidential the details of the agreement on data, records and reports generated from knowledge of outside parties. This article benefits ASMA more because there are implications of protection for ASMA from being examined by third parties in terms of procedures, mechanisms of use, applications, data, costs, prices and efficiency. So what the Deputy Minister said is not true, because ASMA can say, "Okay, this is something that is kept confidential and cannot be given to the general public." I think that is a statement that misleads this House. Thank you.

Honourable Member, I said earlier that the information is sent to the Department of Environment, and after that the Department of Environment, whoever requests information such as air quality, it is the Department of Environment that provides it. This is because ASMA is a contractor to the Department of Environment. It has been 15 years; next year the contract will end in May next year. So, it is not misleading. ASMA cannot provide it, but the Department of Environment can provide information on this air quality to the public.

Next, the waste transfer centre. The Honourable Member for Serdang also mentioned earlier that the water quality there is indeed polluted. This means the Leachate Treatment Plant is not efficient. Is it possible that it is not suitable if the water discharged into whatever it is, a lake or river, Honourable Member?

Dr. Ong Kian MingDAP · PHSerdang

Sungai.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

River. If it is discharged into a river, the Leachate Treatment Plant is indeed not yet efficient enough to treat sewage water from those discharged wastes, solid wastes. What needs to be done is make it more efficient. I have designed for Kuching, the Kuching Waste Management Park plan; it is below VOD, below 20, meaning that is 'A' standard. Therefore, what is important is the design of the Leachate Treatment Plant, how it needs to be built. With that, I will also discuss with the Department of Environment (JAS) to examine the pollution at that waste transfer station, Honourable Member. Apart from that...

Dr. Ong Kian MingDAP · PHSerdangEN

Honourable Minister, a suggestion. I hope the Honourable Minister can discuss with the Ministry of Urban Wellbeing, Housing and Local Government, and also local government, so that the Leachate Treatment Plant at Taman Beringin can be improved, because this is under the Solid Waste Management Department (JPSPM). Thank you.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

That is easy, I can discuss with them. In fact, the former Director-General of the Solid Waste Management Department often discussed with me how to design and so on. Okay, Honourable Member, I will discuss with them. The Honourable Member also touched on the EIA for land reconnection, this is in Johor. I answered first that if it is less than 50 hectares, an EIA is not required under the EIA Order. However, the Director-General has the power for project proponents to conduct an EIA. Therefore, that project has already been stopped and the EIA has already been done. However, when the EIA had already been done, this is the DEIA, the detailed EIA, the EIA review panel said the data or information obtained from the field is still insufficient.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Therefore, they were given, the EIA consultant was given one more month to obtain the important data to complete this EIA report. This is being done now, Honourable Member, because the Director-General of the Department of Environment (JAS) has the power, the Department of Environment has the power to direct that the EIA be carried out further.

Dr. Ong Kian MingDAP · PHSerdangEN

Thank you, Minister, but...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Serdang.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Honourable Member, I said the EIA has already been done. Now the project has already been stopped before the EIA was completed.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Just a moment, Honourable Member. I have to reprimand the Honourable Member for Serdang because the Honourable Member interjected without following the rules. Never mind, Honourable Member, stand up first, then I will ask the Minister whether to give way or not.

Dr. Ong Kian MingDAP · PHSerdangEN

Okay, just a little.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

If we do it that way, we proceed smoothly and do not break the rules.

Dr. Ong Kian MingDAP · PHSerdangEN

Alright, thank you, Mr Chairman. Just a little, Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Do you want to give way, Honourable Member?

Dr. Ong Kian MingDAP · PHSerdangEN

Just one minute.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, so giving way means keeping quiet.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

I have already answered this a little...

Dr. Ong Kian MingDAP · PHSerdangEN

No, I would like to give a brief explanation because what I was told is that the developer is now reclaiming land in that area, while the DEIA has not yet been approved. So, will the ministry take any action, including prosecuting this developer under the Akta Kualiti Alam Sekeliling 1974 because this land reclamation is being carried out? That is all, Minister's explanation. Thank you.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Those activities have already been stopped, Honourable Member. This afternoon at 2.30 pm, there was a meeting related to this, specifically for this. So, an instruction to stop development activities there, Honourable Member. The Honourable Member for Jelebu touched on the jurisdiction of the Department of Environment (JAS) for various rivers, for various river conservation, including the river at Sungai Hosapa, is that the correct pronunciation? Yes, correct. Sungai Hosapa, because the owner of that land has already diverted the river flow through his land. The Department of Irrigation and Drainage (JPS) has no legal power, but the state government has power. The state government has power for matters like this, moving or diverting rivers. So if JPS gives advice to the state government, any department or local authority (PBT), then the PBT should take action on that. This is because such matters, sometimes people's land diverting river flow can cause bottlenecks and subsequently cause floods if there is heavy rain. So, this is indeed a bad thing. So, we do not want flash floods to happen like what happened at Kampung Paya Baru, Ladang, Jelebu. Next, also the flash floods that require technical study. This has already been done, Honourable Member. Flash floods, like Honourable Bakri just now, I still remember, which required RM3 billion. No, Honourable Member, our estimate is RM9 billion, JPS estimate. So this is what is needed, like the flash floods in Kajang yesterday. So in Kajang, those in Kajang may be relieved because the flash floods in Kajang will be given allocation to do what is needed so that flash floods do not happen again. So this is what is important.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Across the country, RM9 billion is needed. But how long will it take us to do this so that flash floods no longer occur? Therefore, JPS will cooperate with PBT and state governments. Next, the Honourable Member for Lumut. The Honourable Member for Lumut mentioned this RTB, which is more than RM800 million. So the project is indeed for flood mitigation, whether within this flood mitigation plan. Flood mitigation plans whether they require building banks on river banks or need to build channels or other drains.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan Serai

Sedikit Menteri.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

That is indeed needed, there are places that need it. For example, in Rantau Panjang, but the allocation is not yet sufficient to do that. This is because Sungai Golok, when there is heavy rain during the monsoon, the flow of water from upstream is 500 'cubic' through only one channel. Therefore, if we divide the 500 'cubic' using other drains, then perhaps floods will not continue to occur, there will be no overflow on the riverbanks.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Third, retention ponds. Retention ponds need to be built so that rainwater or flood water is retained in the retention pond, and there we place pumps, a pump house with pumps there. If the water reaches a certain level, the first pump below will operate. This operates automatically and pumps the water out to the second and third pumps. So, these are three methodologies to tackle floods.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan Serai

[Bangun]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Bagan Serai, please stand, Honourable Member.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Minister, Bagan Serai.

Okey, silakan.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Thank you so much. Thank you, Mr Chairman, thank you, Deputy Minister. I would like to ask about the current status and effectiveness of the flood mitigation plan in Kerian, Perak. This is because two weeks ago there was flooding, and floods now occur frequently. The flooding has not been like the flooding at the end of the 1990s, where there were major floods and thousands of people had to be evacuated, but flooding still occurs. During my recent visit, I saw that the floodgate was not functioning very well, and I saw that there were areas with siltation in the flood mitigation works. So, this is the question I want to ask, what is its status now? The promise was for full completion in 2015, will this happen and what is the government's action? Thank you.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Thank you, Honourable Member. This flood mitigation plan in Sungai Kerian will be continued in 2015. It is in the 2015 project list. So, it is hoped that it can be completed in 2015 so that floods no longer occur there. Even though flooding occurs, because there is already a flood mitigation plan or flood mitigation structure, it does not overflow into the area. Next, the Honourable Member for Gerik. The Honourable Member for Gerik touched on permanent forest reserves in Malaysia, permanent forest reserves that have already been degazetted. Gazetting a permanent forest reserve is the responsibility of the state government, and degazetting forest reserves from areas that have been gazetted is also the responsibility of the state government. So, the Central Forestry Department or the Forestry Department Peninsular Malaysia assists in terms of advice on whether they need to be degazetted or not. So far, approximately five million hectares of permanent forest reserves in Peninsular Malaysia. Apart from that, the Ministry of Natural Resources and Environment also has a project called Forest Spine. We are always discussing with state governments to preserve forests in our country by creating a Forest Spine, that is, forests in one state, forests in other states, we see whether they are in one connection or not, whether they can be connected. All of that is for conservation, Honourable Member.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Next, the Honourable Member for Gerik also touched on surveying and mapping. Surveying and mapping is to help the states. Indeed, the Department of Survey and Mapping Malaysia (JUPEM) helps states with various advice and apart from that, does surveying work too if requested or applied for by state governments.

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Putatan, please stand, Honourable Member.

Thank you, Mr Chairman. The matter raised by the Honourable Member has indeed had a specific allocation for state governments to survey land since long ago. This is under the item KADASTER. The item the Honourable Member touched on just now, I am waiting for this P.02804 – eKADASTER, which the Honourable Member touched on just now. The problem, Mr Chairman, is that we have applied to the Kota Kinabalu Survey and Mapping Department (Jabatan Ukur dan Pemetaan Kota Kinabalu), and the Sarawak Survey and Mapping Department (Jabatan Ukur dan Pemetaan Sarawak) has also applied for an allocation each year to be channelled to state governments to survey approved land, which helps state governments survey private land, especially village land in Beluran. Perhaps in Keningau too, in Suk and Pensiangan, there is land that has not yet been surveyed. However, the allocation given is insufficient. Can the Honourable Member, if possible, look into this a little so as to help, so that the surveying of this land can be carried out as quickly as possible? Can the Honourable Member?

Dato' Dr. James Dawos MamitPBB · BNMambongEN

We will help the state government in this matter. That is why we established eKADASTER, so that we have records and information, the most important data, and what needs to be resolved, we will resolve as quickly as possible through eKADASTER. Next, the Honourable Member for Gerik also touched on tin ore mining, where there are only two enforcement officers in Perak. I will discuss with the Department of Mineral and Geoscience (JMG) to examine this matter, whether two enforcement officers are sufficient or not. This is because tin ore mining anywhere should be monitored and well looked after so that improper activities are not carried out by miners. Tin ore mining at Kelian Intan which caused river pollution did occur. I agree with the Honourable Member's view. This is because during the rainy season, whatever is stored on the land at the mining site will flow into the river. So the chemicals used for this mining will flow into the river, and so river pollution indeed occurs. Therefore, if this mining area had had an EIA done beforehand, mitigation measures should indeed have been in place. If no EIA was done, there were no mitigation measures. Therefore, enforcement and monitoring are needed in this matter.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, can you finish within 10 minutes, or do you want to answer in writing?

Dato' Dr. James Dawos MamitPBB · BNMambongEN

For the others, I will answer in writing, Honourable Member.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Thank you, Honourable Member.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Mr Chairman, may I pass, Mr Chairman.

Laluan lagi?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, the others may answer in writing, Honourable Member.

Written answers? Written answers, Kapar. Can, Mr Chairman?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes. Can answer in writing, Honourable Member.

Ya, boleh?

Boleh.

I just- may I, Mr Chairman?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Done, it's finished.

Jawapan bertulis?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

For the others, already answered in writing, Honourable Member.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

It's already 5.30 pm. Okay, for the others I haven't answered yet, written answers.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, thank you, Honourable Member.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Only up to the Honourable Member for Gerik can I answer. Written answers later will include a list of projects in the Honourable Member's constituency.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Honourable Minister, may I have one minute?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Kota Kinabalu, please sit down, Honourable Member. Honourable Members, the problem is that the sum of RM1,101,875,500 for Purpose B.23 under the Ministry of Natural Resources and Environment (Kementerian Sumber Asli dan Alam Sekitar) forming part of the Schedule must be agreed to. [The question was put for decision, and agreed to] [The sum of RM1,101,875,500 for Purpose B.23 was ordered to form part of the Schedule]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The question is that the expenditure of RM1,584,203,700 for Purpose P.23 mentioned in the Development Estimates for 2014 be approved. [The question was put for decision, and agreed to] [The sum of RM1,584,203,700 for Purpose P.23 was approved as part of the Development Estimates 2014] [The Assembly reconvened] [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) presiding

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Members, today's sitting of the House is adjourned until 10 am on Monday, 17 November 2014.

[The House was adjourned at 5.32 pm.]