Dewan Rakyat · 18 November 2014

15th Parliament, session 2, meeting 3 · 993 turns · 62,340 words · official PDF ↗ · Digital Hansard ↗

886 of 993 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) presided over the Sitting]

Oral Answers to QuestionsQuestions

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

I would just like to remind everyone that supplementary questions should be put in accordance with the rules of the meeting, which are brief and concise. It would also be good if the answers from the Honourable Minister's side were brief as well. Thank you.

Tiong King SingPDP · GPSBintulu · questionEN

1. Dato' Seri Tiong King Sing [Bintulu] asks the Minister of International Trade and Industry to state the plans and progress of the process of forming an Economic Cooperation Agreement (ECA) for investors and entrepreneurs between Malaysia and Taiwan.

Dato' Sri Mustapa MohamedUMNO · BNMinister of International Trade and Industry · JeliEN

Assalamualaikum warahmatullahi wabarakatuh. Good morning, Mr Speaker, thank you, Honourable Member for Bintulu. This question concerns trade relations between Malaysia and Taiwan, in particular the proposal to sign a trade agreement between Malaysia and Taiwan. In this regard, for the Honourable Member's information, Taiwan is a territory with a population of approximately 23 million people. This is based on per capita income. It is a developed country. Taiwan's per capita income is approximately USD40,000, compared with Malaysia's approximately USD10,000 to USD11,000. So Taiwan is a developed territory, and its economic base is manufacturing, particularly in electrical and electronics. That is a little background on Taiwan. Secondly, Mr Speaker, Malaysia's relations with Taiwan in the economic and trade fields are good, and can be said to be very good. Taiwan was Malaysia's eighth largest trading partner last year. Total bilateral trade between Malaysia and Taiwan increased significantly over the past four-fifths of a decade, namely from approximately RM33 billion in 2009 to RM53 billion in 2013, an increase of 60 per cent. So Taiwan is an eighth largest trading partner. It is an important country, and relations between Malaysia and Taiwan are good. Thirdly, in terms of investment, so far the total investment by Taiwan in Malaysia is worth approximately USD5.4 billion. So whether in trade or investment, economic relations between Malaysia and Taiwan are good. The Government is aware that several countries have already signed free trade agreements. Taiwan and Singapore, and New Zealand for example, have already signed an agreement called ASTEP, not called an FTA. As an example, with Singapore it is called the Agreement between Singapore and the Separate Customs Territory of Taiwan, Penghu, Kinmen and Matsu (ASTEP).

Dato' Sri Mustapa MohamedUMNO · BNMinister of International Trade and Industry · JeliEN

Likewise, New Zealand signed one last year. It is also an ASTEP Agreement. So several governments are aware that several countries have already signed agreements with Taiwan. Mr Speaker, in addressing this issue, the Government is guided by the current policy. Our policy, with permission, is called the One China Policy, whereby we respect China's position that Taiwan is part of the PRC, the People's Republic of China. Therefore, whatever we do is based on the national policy, namely respecting China's national policy, and the Ministry of International Trade and Industry (MITI) always holds discussions and negotiations with Wisma Putra before any action is taken. So one reason why we are cautious in this matter is because we have a One China Policy. In the meantime, I would like to inform the Honourable Member for Bintulu that we are open and always looking for ways in which we can enhance trade and investment relations with Taiwan without compromising the One China Policy. So this is the approach taken by the Government. At present we have not made any decision regarding the proposal made by the Honourable Member for Bintulu. Apart from the policy, with permission, the One China Policy, before we sign any agreement, we must of course conduct a study. A study has indeed been carried out by ASLI and the Chung-Hua Institution for Economic Research, and this study has already produced results. However, what is more important is that we respect the One China Policy practised by the Government at this time. Regarding FTAs, we have an open attitude. We have signed 13 FTAs so far, the latest being with Turkey. So Malaysia has an open approach on the FTA issue because we are a country that depends heavily on external trade. Thank you.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Thank you, Mr Speaker, thank you, Honourable Minister. I understand that we are not very well today, yet have come to answer this question. Thank you. Mr Speaker, we understand that in this issue, the purpose of the ECA is to facilitate bilateral trade and economy between Malaysia and Taiwan.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Tax exemptions attract investors to Malaysia or Malaysia to Taiwan. Enhancing Malaysia-Taiwan economic cooperation. Malaysia, we understand that. We have the One China Policy. I think, if possible, our country must want to send a message to China. We, together with Taiwan, are not talking about the ECA in relation to politics. This has nothing to do with politics. This is about the economy. Our people invest in Taiwan, or Taiwan invests in Malaysia. We must remember that our people, like our students, number about 18,000. Malaysian students are pursuing their studies in Taiwan. I have discussed with male and female students before, and they say they study there. When they return, who will they do business with? They do have connections with Taiwan. This is it: if we do not look at this, we will not reach China, and these people, when they return tomorrow, will all be angry with us. This is how we give opportunities. All male and female students who return will vote for the opposition. Not giving them an opportunity, but China is different. They do not need to vote, they raise their hands. But we must want to look at this matter. If you look until today, many male and female students who return from Taiwan are angry with us. We are not protecting the interests of male and female students or of this young generation. I would like to tell you here that there are agreements signed between Malaysia and Taiwan: 1993, Investment Protection Agreement; 1996, Double Taxation Avoidance Agreement. We have also signed. What is the problem if we seriously consider this ECA for the people of Malaysia, especially our own people. I want to ask a question. Can the ministry take the initiative to hold discussions with China? If China does not agree at all, why is there noise with China now, because China is also now talking with Taiwan. There is also an agreement on economic cooperation together. We just want to resolve the interests of the people.

Dato’ Seri Tiong King SingPDP · GPSBintuluEN

Tell him, if possible, the ministry please, can the ministry take an initiative to hold discussions with the Ministry of Foreign Affairs and China. Not with the Ambassador, but with China itself, how we can achieve a win-win situation in resolving this problem. Thank you.

Thank you, Mr Speaker. Thank you, Honourable Member for Bintulu, for the proposal that we hold discussions with the parties concerned. As I have informed, the main issue is that we have a policy and we respect this policy. In the meantime, we do not close the door to discussion. As I said in my earlier reply, we have held discussions with various parties on how we can address this problem while taking into account the sensitivities relating to the One China Policy, with permission. That is the method we have started, and indeed we have been discussing it since 2011, so it has been three years. There is still no method, and we thank the Honourable Member for Bintulu for the proposal. It is true that many of our students are there, but as I informed earlier, our relations with Taiwan in trade and investment are very good. It is true that if there is a free trade agreement in any region of the world, this will have a positive effect on trade and investment. This is clear from our own experience: we have dealt with 13 agreements and the results have been good. However, in the case of Taiwan, we must respect China, which is our first trading partner between Malaysia and China. So we will try to find a win-win solution. Thank you.

Tuan Sim Tong HimDAP · PRKota MelakaEN

Thank you, Mr Speaker. Honourable Minister, with the ECA, could the Honourable Minister explain in more depth the modus operandi of the win-win situation mentioned earlier, and has a special officer been set up so that we can continue coordination between the two countries?

Mr Speaker, I was not clear about the earlier question. If I understand the Honourable Member for Kota Melaka correctly, the Honourable Member for Kota Melaka wanted to know about the possible agreement concluded by Singapore and New Zealand, possibly with Taiwan. So usually this ECA covers several matters. The first is called trade in goods; the second is services; and the third is investment. These are the usual scope or coverage of an ECA, and of other agreements. However, the main focus at the early stage is trade in goods. That is less difficult. After that, we look at the services sector, which is challenging; and third is the investment sector, which comes at the stage of discussions when any negotiations are held. Next is a more advanced or progressive stage where other matters are discussed, as in the RCEP, the Regional Comprehensive Economic Partnership, and also the TPP. This involves not only the matters I mentioned earlier but also other matters that have no direct connection with trade. Thank you.

Jimmy Wong Sze PhinDAP · PRKota Kinabalu · questionEN

2. Mr Wong Sze Phin @ Jimmy [Kota Kinabalu] asks the Minister of Urban Wellbeing, Housing and Local Government to state whether the Federal Government will allocate funds and cooperate with Kota Kinabalu City Hall (DBKK) to build more parking areas or buildings in Kota Kinabalu City. If so, state the plans and allocations provided.

Datuk Halimah binti Mohd. SadiqueUMNO · BNDeputy Minister of Urban Wellbeing, Housing and Local Government · TenggaraEN

For the information of the Honourable Member for Kota Kinabalu, the Ministry (KPKT), through the local authorities, does provide, and always provides, allocations every year for carrying out small projects at local authorities. This is through matching grants and annual grants. Also to improve various facilities, not only subject to building parking spaces in all local authority areas. This includes the allocations channelled by the ministry to Kota Kinabalu City Hall (DBKK), as raised by the Honourable Member, every year.

Datuk Halimah binti Mohd. SadiqueUMNO · BNDeputy Minister of Urban Wellbeing, Housing and Local Government · TenggaraEN

These allocations will be considered based mainly on applications, especially from Kota Kinabalu City Hall (DBKK), subject to adding more parking spaces. For the information of the Honourable Member for Kota Kinabalu, parking spaces are one of the important elements in a city or any development, whether residential or commercial, because the parking provided plays a role in supporting the functions and activities of that development. For the information of the Honourable Member for Kota Kinabalu, in 2011 the ministry did approve an allocation for building a parking area near the open space at Taman Kingfisher, Honourable Member, in 2011, and in 2014 the ministry received an application for allocation from Kota Kinabalu City Hall to build new parking spaces.

Datuk Halimah binti Mohd. SadiqueUMNO · BNDeputy Minister of Urban Wellbeing, Housing and Local Government · TenggaraEN

I myself went down to look at the proposed parking spaces that Kota Kinabalu City Hall intended to propose. As a result, the ministry has approved the proposal to build an open parking area near Klinik Luyang. Honourable Member knows, right? Near Klinik Kesihatan Luyang, with an allocation of RM468,515. Apart from that, Honourable Member, Kota Kinabalu City Hall is also planning to build a multi-storey car park at Foh Sang, and for the Foh Sang area, a total of 350 to 400 bays will be provided, and the design is being prepared. Most importantly, consultation with residents in the surrounding area must be carried out, and it will be carried out this November before any decision is made to release an allocation for building the parking area concerned. Apart from that, I would also like to inform the Honourable Member for Kota Kinabalu that a five-storey multi-storey car park with 450 bays will be built at the Kampung Air open parking area in the Kota Kinabalu central business district (CBD Area). A multi-storey car park building with 250 bays will be built at the Damai Phase 3 open parking area, with permission. An open parking area at Pekan Menggatal, on existing open land used as parking, with 220 bays is proposed. An open parking area near Dewan Serbaguna Damai, as an addition to the existing parking on open land owned by Kota Kinabalu City Hall, with 60 bays. Thank you, Mr Speaker.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Kota Kinabalu.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Thank you, Honourable Deputy Minister. Mr Speaker, I would like to know whether the ministry provides allocations to DBKK. Earlier I heard only RM400,000 million every year in the important budget. Every year in the budget, if so, please state how much allocation has been given to DBKK and how much DBKK's expenditure estimate is each year? Because the Mayor of Kota Kinabalu claims that DBKK is facing difficulties in launching or building such as vehicle parking buildings in the city area? Because the Federal Government has not yet provided allocations, Honourable Deputy Minister. I would like to know...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, that's enough, Honourable Member.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Why is it late, and what is the mechanism by which the Federal Government provides that allocation to DBKK? I ask for an explanation, Mr Speaker. That's all, thank you.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

You may answer one supplementary question, Honourable Member.

I will answer just one. After this, Honourable Member, you may meet me at the back. I have already answered earlier, Honourable Member. The allocation the ministry approved is RM468,515, not RM468 million. RM468,515 is for building a parking area at Klinik Luyang. I explained from the beginning, Honourable Member, that the ministry has provided assistance, two types of assistance to local authorities. One is matching grants and the other is annual grants. Every year, local authorities must plan for the needs they require. I also said earlier that the ministry will add allocations for any needs required, especially for providing more parking spaces. I have read out the list earlier, Honourable Member, and I hope Honourable Member understands. I did not mention the amount in millions, but I said...

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

So why is the Mayor still complaining that there is not enough money?

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Kota Kinabalu, sit down.

It's alright, it's alright. Sit down first. Later, Honourable Member... Enough, enough. The Mayor said that the allocation is not enough, and revenue collection needs to be diversified. If we rely on collecting revenue through the existing methods, perhaps we will not be able to add to the sources of income for local authorities. That means local authorities need to diversify their financial sources to increase revenue. Apart from that, they can obtain allocations from the ministry. That's all, Honourable Member, thank you, Honourable Member.

Thank you, Mr Speaker. Thank you also to the Honourable Deputy Minister for answering my friend from Kota Kinabalu. Honourable Deputy Minister, the Honourable Member for Kota Kinabalu is actually out of date. He does not know, because he did not do that work, Honourable Deputy Minister. All the parking spaces in KK have already been implemented.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Mr Speaker, this is malicious intent. Tell him to withdraw it, there is no work. Every day he is just a troublemaker.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Putatan, your question.

Is the question correct or not, Honourable Deputy Minister? The Federal Government has already given many allocations to DBKK, according to the projects submitted to the ministry? But the problem is the implementation, Honourable Deputy Minister. Does the Honourable Deputy Minister also monitor the implementation of DBKK, especially the cleanliness of Kota Kinabalu City and the landscape, which are not yet satisfactory, especially in terms of cleanliness. If the Honourable Deputy Minister goes to Kota Kinabalu, in my constituency you can see rubbish floating in the rivers, along the seashores, along the drains, everywhere. Does the Honourable Deputy Minister see this and help...

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

...Mr Speaker, this is not his constituency.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat Kota Kinabalu duduk. You are out of focus, Yang Berhormat.

He does not do his job,

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Putatan, that's enough, Honourable Member.

Mr Speaker, the truth is that he does not do his job. He does not look at where the real problem is.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

We are in Q&A here, Honourable Member. That's enough.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

It is not that I do not do my job, it is the Federation that does not do its job.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Kota Kinabalu, sit down. It is not good like this, Honourable Member. Villagers are watching television now.

Honourable Member for Kota Kinabalu, there is no need to be so fierce, just because you appeared on television this morning. I would like to inform you that earlier, four projects will be carried out by Kota Kinabalu City Hall, for four areas. No, no, Honourable Member, sit, sit. This is not a question-and-answer session.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

[Stands up] But Honourable Deputy Minister, what you, Honourable Deputy Minister, gave, what is this four hundred thousand, what is that?

This Honourable Member has only just been informed, which is why he is only now wanting to react. One word, Honourable Member for Bayan Baru, wanting to react in Parliament. Honourable Member and Mr Speaker, the four projects I mentioned just now. That's enough, that's enough, Honourable Member.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

I'm reacting, then...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

That's enough, Honourable Member.

Enough, enough. If you want to speak, speak during the debate later. The four projects that were mentioned just now, Mr Speaker, total RM50,500,000. Apart from the RM468,515,000 that I mentioned just now. I will not answer the question from the Honourable Member for Putatan at all, because it has no direct connection with car parking. Thank you.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Yes, perhaps a little tense because the Honourable Deputy Minister is wearing red and the Honourable Member for Kota Kinabalu is wearing a red tie. It's red against red. I invite the Honourable Dato' Noraini binti Ahmad.

Noraini binti AhmadUMNO · BNParit Sulong · questionEN

3. Dato' Noraini binti Ahmad [Parit Sulong] asks the Minister of Natural Resources and Environment to state the current status of the achievement of the MYCarbon programme, which targets a 40 per cent reduction in national greenhouse gas emissions by 2020, following the commitment given by the Right Honourable Prime Minister in 2009 at the United Nations Summit on Climate Change.

Dato’ Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

Mr Speaker, for the information of the Honourable Member for Parit Sulong, the Ministry of Natural Resources and Environment, with the cooperation of the United Nations Development Programme (UNDP), is implementing the National GHG Report programme, or National Green House Gasses, known as MYCarbon, to encourage the reporting of GHG emissions by corporate organisations and private companies.

Dato’ Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

This programme was launched on 3 December 2013. The programme is still at the pilot phase, where implementation is ongoing, and to date it has received participation from 26 organisations from various categories such as energy generation, transport, telecommunications, manufacturing and industrial processes, water treatment and services.

Dato’ Dr. James Dawos MamitPBB · BNDeputy Minister of Natural Resources and Environment · MambongEN

The Right Honourable Prime Minister has announced that Malaysia will adopt a conditional voluntary indicator, a conditional volunteer indicator, to reduce carbon intensity based on Gross Domestic Product or GDP by up to 40 per cent by 2020, at the Conference of the Parties Fifteenth or COP 15 of the United Nations Framework Convention on Climate Change in Copenhagen, Denmark, in 2009. While delivering a speech at the Climate Summit 2014 in New York, the Right Honourable Prime Minister announced that the status of the country's achievement of carbon intensity reduction is 33 per cent of the 40 per cent targeted, 33 per cent having been achieved. Various initiatives have been implemented to track the 40 per cent target of carbon intensity based on Gross Domestic Product or GDP by 2020. Incentives to track this target of reducing carbon emission intensity have been implemented, covering three main programmes, namely energy efficiency use, renewable energy and solid waste management. At the same time, the country's forest area must be maintained at a level of at least 50 per cent of the total land area. This is to ensure the continuous absorption and storage of carbon. Accordingly, the ministry has implemented the Plant 26 Million Trees Campaign with the theme Green the Earth, One Citizen One Tree, which was launched simultaneously across the country in conjunction with World Earth Day on 22 April 2010. As of August 2014, Mr Speaker, a total of 62.5 million trees have been planted over an area of 79,379.61 hectares. That is all, thank you.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Thank you very much to the Honourable Deputy Minister and Mr Speaker. Before I bring my supplementary question, I would like to welcome the Village Heads of the Gerik Parliamentary constituency who are seated on the right. Gerik has also got a name. Okay, so my supplementary question arises from the answer given by the Honourable Minister just now. I would like to ask the ministry what challenges the ministry faces in the process of collecting GHG emissions data, and what plans and activities have been drawn up and planned apart from this tree-planting programme to reduce these greenhouse gas emissions, and their achievements so far. Thank you.

Thank you, Honourable Member for Parit Sulong, for the supplementary question, which is very incisive. Mr Speaker, there are indeed many challenges, because when we make calculations and inventories of the programmes implemented, it requires a high level of expertise. Nevertheless, the ministry has already done so before this MYCarbon Project was launched in 2013. Programmes that have already been implemented include the feed-in tariff relating to the use of various sources to generate electricity supply such as biogas, biomass, mini hydro and solar PV or solar photovoltaic. Apart from that, other programmes are the Green Building Index (GBI), recycling, use of biodiesel, Compressed Natural Gas Used or CNG, and the Green Technology Financing Scheme, which indeed exists, Defend Avoidance. After that, transport produces indeed a great deal of greenhouse gases, forest conservation or the preservation of forests, governments to lead by example, government activities. So the reduction in 2013 was in total 52,027,682.69 metric tonnes, the total of this reduction. So this reduction is 33 per cent of 40 per cent. We set a target for reduction in 2020 of 63,020,508.2 metric tonnes. So before 2020 we have already achieved 33 per cent, with only 7 per cent remaining, meaning we need to reduce the remaining 10,992,825.51 metric tonnes. So that is easy for us to achieve by 2020 accordingly. As for the question regarding forest conservation: the forests in our country total 20.3 million hectares. So these forests are what absorb much of the carbon dioxide gas produced in our country. Our country produces 0.64 per cent of the total amount produced by the world, which is 34.5 per cent. So our forests absorb 49 per cent of the carbon dioxide gas produced in our own country each year.

Other countries indeed produce many greenhouse gases, such as China, which produces 9.8 billion metric tonnes, and the United States of America, which produces 15.1 billion metric tonnes. That is all, thank you, Mr Speaker.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Thank you, Mr Speaker. Before that, I hope Mr Speaker will direct the Honourable Member for Bintulu and the Honourable Member for Putrajaya not to make noise in the House. Their voices are too loud.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Yes, the Honourable Member's question.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Honourable Deputy Minister, the main contributor to the greenhouse effect, apart from factories, is also vehicles, and the gases released by air conditioning or air conditioners. The gases used in air conditioners, R22, namely HCFC, are environmentally unfriendly and very easily released into the air when technicians carry out maintenance and when there is a gas leak in air conditioners. This is not only for air conditioners in homes but also for commercial air conditioners that use R134a gas. Both R22 gas and R134a gas are environmentally unfriendly gases.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Yes, a direct question, Honourable Member.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

There is a question. Does the Honourable Deputy Minister intend to, what alternatives are there to replace this R22 gas, this HCFC? Will the ministry use legal means to compel or recycle this R22 gas so that R22 gas can be collected back and recycled, reused for air conditioning? Also...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

One question is enough, Honourable Member.

Tuan Hee Loy SianPKR · PRPetaling Jaya Selatan

Satu lagi...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

One question, Honourable Member, just one question.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Yes, one question. Okay, thank you.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Deputy Minister, answer the Honourable Member's question directly.

Dato' Dr. James Dawos MamitPBB · BNMambongEN

Thank you, Honourable Member for Petaling Jaya Selatan. For the information of this august House, Mr Speaker, CFC gas for air conditioners has already been prohibited and is no longer used. It has long not been used, CFC. Now the one used is HCFC, hydrochlorofluorocarbon. However, under the Montreal Protocol, the HCFC currently used in many parts of the world will also be phased out. It will be phased out and no longer used by 2020. So now the reduction, how much is the reduction, and then by 2020? Now, the Conference of Parties of the Montreal Protocol is taking place in Paris, France, to discuss all these matters. If HCFC is also banned, then another gas that does not cause pollution to the air is HCF, hydrofluorocarbon. In fact, what happens to all these gases that will be banned is similar to CFC. CFC is released at ground level, it rises but not very high, only 10 kilometres into the air, but because of UV, ultraviolet rays, which mix with this CFC, it is broken down into atoms, and these atoms are what rise far into the air and create a hole in the ozone layer in outer space. That is why CFC and HCFC are no longer used, although they are somewhat less, but they will still be banned by 2020. Thank you, Mr Speaker.

Mohd Idris bin JusiPKR · PRBatu Pahat · questionEN

4. Datuk Mohd Idris bin Jusi [Batu Pahat] asks the Minister of Domestic Trade, Co-operatives and Consumerism to state the actions that have been and will be taken to assist rural residents, especially in the Rengit and Senggarang areas in the Batu Pahat Parliamentary constituency, who are facing a double problem of rising prices of daily essential goods and falling prices of village produce.

Dato' Seri Ahmad Bashah bin Md. HanipahDeputy Minister of Domestic Trade, Cooperatives and ConsumerismEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace and greetings of 1Malaysia. Thank you, Mr Speaker, thank you, Honourable Member for Batu Pahat. In answer to the Honourable Member's question, the government takes very seriously the issue of rising prices of essential goods, as it affects the cost of living of the people, especially residents in rural areas and also in the areas concerned, including Rengit and also Senggarang in the Batu Pahat Parliament. Monitoring the prices of the people's essential goods is one of the government's initiatives to detect movements in the prices of goods sold so that they do not burden the people. However, the prices of goods sold in the local market are determined by various factors, especially supply and demand, both domestic and foreign. Therefore, the Rengit and Senggarang areas, where the main agricultural activities are oil palm and coconut, directly face the effects of these factors. The Ministry of Agriculture and Agro-Based Industry has already implemented supply assurance and agro-food distribution initiatives to help address price increases for selected communities more efficiently. For this purpose, the strategy to be taken in the Batu Pahat Parliamentary area is the upgrading and image improvement of the wholesale farmers' market and also the maintenance of existing ones, as well as the establishment of four farmers' collection centres, namely in Rengit, Batu Pahat Tengah, Batu Pahat Utara and Parit Raja. This is the information we obtained from the Ministry of Agriculture and Agro-Based Industry. Apart from helping farmers market and sell their agricultural produce directly, the establishment of farmers' markets and these farmers' collection centres can reduce the role of middlemen and also provide additional market space for the agro-food community to reduce the rise in prices of daily essential goods there. In addition, for the Honourable Member's information, the Ministry of Domestic Trade, Co-operatives and Consumerism (KPDNKK) has carried out enforcement in the Rengit and Senggarang areas in the Batu Pahat Parliament from 1 January 2014 until 15 September last, where a total of 1,579 inspections of premises were carried out, producing three cases, namely one case of price tagging under the Price Control and Anti-Profiteering Act 2011 and two cases under the Weights and Measures Act 1972, with a seizure value of RM78.80, and two cases were compounded with collections totalling RM500, while one other case is still in the process of compounding.

Dato' Seri Ahmad Bashah bin Md. HanipahDeputy Minister of Domestic Trade, Cooperatives and ConsumerismEN

To curb traders from raising the prices of goods arbitrarily, the Ministry of Domestic Trade, Co-operatives and Consumerism (KPDNKK) has implemented and will continue to implement several programmes or monitoring measures, such as enforcement of the law, namely strengthening enforcement actions by intensifying inspections and monitoring. Second, the Price Monitoring Programme. Third, holding the Consumerism Education Programme, and fourth, holding consultation sessions with industry. Therefore, through these measures, the government's intention to address the problem of uncontrolled price increases of goods, as the Honourable Member mentioned just now, especially involving the middle- and low-income groups, can be achieved. This will certainly improve and further enhance the quality of life of the targeted groups so that they can enjoy well-being in life. Thank you.

Datuk Mohd Idris bin JusiPKR · PRBatu PahatEN

Mr Speaker and the Honourable Deputy Minister. Thank you for being very concerned about the people, especially in the areas of the Senggarang State Assembly seat and the Rengit State Assembly seat.

Datuk Mohd Idris bin JusiPKR · PRBatu PahatEN

My supplementary question: when the GST was implemented, a list of goods was mentioned, and the media reported that more than 40 goods would be exempted from GST, with the hope that the prices of those goods would not rise. Mr Speaker, on behalf of the Malaysian people and especially in Rengit or Batu Pahat, we want a guarantee, or can the Honourable Minister and the government give a guarantee that this list will not keep changing. Adding is allowed, reducing is not. As long as GST is implemented, as long as there is the moon and the sun. Second...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

One question, Honourable Member.

Datuk Mohd Idris bin JusiPKR · PRBatu PahatEN

It is related to a guarantee, Mr Speaker. Can Mr Speaker and the Honourable Minister in this august House once again, to curb price increases, ensure that controlled goods exempted from GST, such as sugar, rice and cooking oil, are not arbitrarily raised? They are not subject to GST, but they are raised through other means which the Honourable Minister is well aware of and knows the methods. Mr Speaker, my villagers want to hear the answer to that guarantee. Thank you.

Thank you, Honourable Member for Batu Pahat, for the supplementary question. For the Honourable Member's information, if the Honourable Member asks that the government give a guarantee that the prices of these goods will not change, the guarantee the Honourable Member is asking for is that they do not go up or down, in other words, not change either. So if they have gone up and not down, how can they change? [Laughter] So that is why, Honourable Member, a guarantee to ensure these goods do not change is not possible, because if the price of the goods falls, it has already changed from that price. So, insya-Allah, Honourable Member...

Datuk Mohd Idris bin JusiPKR · PRBatu PahatEN

Mr Speaker, it has never come down.

Insya-Allah, Honourable Member, yesterday I also mentioned enforcement. We already have some one thousand and a few hundred enforcement personnel to ensure that when this GST is implemented, and the addition of enforcement officers, which has been approved by the Cabinet, is close to 500. So, the total is about 2,300 enforcement officers who will ensure that when this GST is implemented next April, the problem mentioned by the Honourable Member will be addressed. We certainly know that this opportunity will be taken by traders who want to make quick or greater profits. However, we will carry out control because we will ensure that prosecution is carried out against any traders who take advantage of the implementation of this GST. Thank you.

Thank you, Mr Speaker. Our inflation figure from January to September 2014 totalled 3.3 per cent. Secondly, we acknowledge the decline in commodity prices, especially rubber, that is occurring at this time, where the government has taken action by providing one-off assistance and introducing a rubber production incentive that will take effect in January 2015. So my question to the Honourable Minister is, what exactly is the form of cooperation and chain with other ministries and also agencies? Firstly, to ensure that we can educate the people and diversify efforts to increase income. Secondly, we can control the supply chain so that we can ensure that the prices of any goods at this time can always be controlled. Thank you, Mr Speaker.

Thank you, Honourable Member from Jasin. For the Honourable Member's information, there is indeed cooperation that we have carried out, especially together with the Ministry of Agriculture and Agro-Based Industry.

This is because the Ministry of Agriculture and Agro-Based Industry and also the Ministry of Domestic Trade, Co-operatives and Consumerism always work together to ensure that daily essential goods sold in markets or in rural areas and also urban areas can be ensured to always follow the prices that have been set. So for that reason, Honourable Member, in the programme together with the Ministry of Agriculture and Agro-Based Industry, we have the Agro Bazar Kedai Rakyat Development Programme and also the product development and branding programme together with the Ministry of Agriculture and Agro-Based Industry. So, this cooperation has in fact produced many farmers' markets and agro bazaar markets, and agro bazaar shops that exist, to help the ministry address the problem of rising prices of daily essential goods, whether in urban or rural areas. Thank you.

[Question No. 5 – Honourable Datuk Datu Nasrun bin Datu Mansur (Silam) absent]

G. Manivannan a/l GowindasamyPKR · PRKapar · questionEN

6. Tuan Manivannan A/L Gowindasamy [Kapar] asks the Prime Minister to state: (a) in detail the list of names, ages, state of birth, family background, and achievements of children who have participated in the Permata Negara Pilot Project since its implementation until today; and (b) what are the short-term and long-term plans of the Permata Negara Pilot Project so that every child in Malaysia can enjoy a complete and quality education, and how the 2014 allocation has been spent accordingly to achieve that objective.

Dato' Seri Shahidan bin KassimPAS · PNMinister in the Prime Minister's Department · ArauEN

Greetings of transformation. In the name of Allah, the Most Gracious, the Most Merciful, Mr Speaker. For the information of the Honourable Members, the Permata Negara Programme began with the Permata Pilot Project from 2007 until 2009. During that period, a total of 14 Permata Negara Child Centres (PAPN) were developed in every state to test the suitability of the Permata curriculum that had been developed in line with the Sure Start curriculum used at the Pen Green Centre, Corby England. This curriculum was subsequently improved by a group of early education experts by taking into account the suitability of the local environment and culture. The objective of developing PAPN in every state is to conduct a pilot trial assessment of the suitability of the PERMATA curriculum for implementation in various states with different ethnicities, customs and local cultures. A study by UPSI and the National Child Development Research Centre in 2007 found that 84 per cent of children in PERMATA Negara achieved good emotional development and formed calm, stable, cheerful and self-confident personalities compared with those who did not follow the PERMATA curriculum. The study also concluded that they were more outstanding than non-PERMATA children, with more than 80 per cent of them achieving pre-science skills, being able to use sentences fully and correctly, being capable of managing themselves, and being friendly and easy to follow instructions.

Dato' Seri Shahidan bin KassimPAS · PNMinister in the Prime Minister's Department · ArauEN

As a result of the successful implementation of the curriculum during this pilot project, from 2009 the government approved the expansion of the Permata Negara Programme through two main phases as follows: Phase 1 from 2009. Application of the national curriculum, the PERMATA curriculum, to kindergartens managed by the government and statutory bodies such as Taska KEMAS, Taska Perpaduan, PAPN, Taska Yayasan Pembangunan Keluarga Terengganu, Taska Tempat Kerja and selected Taska Komuniti. Up to now, a total of 700 kindergartens have come under the Permata Negara Programme.

Dato' Seri Shahidan bin KassimPAS · PNMinister in the Prime Minister's Department · ArauEN

Phase 2 from 2013. Application of this national curriculum has been extended to all kindergartens managed by the private sector, with amendments to the Child Care Centres Act 1984 and the Child Care Centres Regulations 1984. For the information of Mr Speaker, the background of those who may enter the Permata Negara Programme is as follows: (i) children under the age of four; (ii) children from households with a monthly income of less than RM1,500 in rural areas and RM3,000 in suburban areas; (iii) the services of this centre give priority to parents who live or work near the centre, not more than 10 kilometres from the PERMATA centre; and (iv) priority is given to applications from single mothers and parents with a large number of children and dependants. Up to now, the number of children currently following the PERMATA Negara lessons by age is as follows: (i) 2009 - four to five years old, 106 persons; (ii) 2010 - three to four years old, 765 persons; (iii) 2011 - two to three years old, 704 persons; (iv) 2012 - one to two years old, 242 persons; and (v) 2013 - 0 to one year old, namely six babies who are undergoing a trial in Dungun Terengganu; (vi) Overall PERMATA kindergartens, Permata Negara Child Centres, 83 places, 1,823; (vii) Department of Community Development (KEMAS), 414 - 7,775 children; (viii) Department of National Unity and Integration, 41 centres with 883; (ix) Workplace kindergartens (TTK), 98 with a total of 5,113; (x) Terengganu Family Development Foundation, 64 - 2,825. The total is 18,419. Honourable Kapar also requested the list of names, ages, state of birth and family background of children who have followed this PERMATA Programme. Under the Personal Data Protection Act 2010, which prohibits personal data from being used publicly, I am unable to disclose such information as requested by the Honourable Member. Mr Speaker, for future planning, the PERMATA Division is developing a standard and quality assessment instrument named PERMATA Q. The development of this standard and quality monitoring instrument for PERMATA kindergartens is suitable and in line with the philosophy and objectives of the Permata Negara curriculum, and also fulfils and meets the requirements of the Child Care Centres Act 1980 and the TASKA Regulations by the Department of Social Welfare. Thank you.

Thank you, the Honourable Minister. Thank you, Mr Speaker. I am of the view that children are the most important asset of the nation, especially at the early education level, namely under the age of four. My question is whether all levels of society, namely children, poor Malays, Indians, Chinese, Ibans, Kadazans, Dayaks and others, can follow this programme. What is the percentage of these ethnic groups who are following the PERMATA Programme? I follow the PERMATA website. Up to today, the number of students is 1,780 persons. So, what is the percentage of ethnicities following this programme? My second question relates to, Mr Speaker...

Deputy Speaker (Datuk Seri Ronald Kiandee)EN

That is enough, Honourable Member.

Berkaitan, berkaitan...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)

Cukuplah.

Because earlier, Mr Speaker, this is important.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Later, when the Honourable Member raises it, I ask the Honourable Minister to answer only one question.

No, this one is important because when I asked about the background, the Honourable Minister answered earlier with prerequisites. That is different.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Yes, that is enough, Honourable Member.

So, background, background about...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

There have already been two questions in that. Yes, please, the Honourable Minister.

...Children who follow. So, I ask for explanation and clarification. Not the prerequisites that are on the website, Mr Speaker.

Honourable Member, I have already answered the last one. Why I cannot give these figures is a personal matter. But I want to say to the Honourable Member. Among the people who follow this kindergarten are someone named Lee Jun Kwan, someone named Rameshraw A/L Venkatasamaraw, a name Kevin A/L Ramesh. There is a name Angelina Low Yee Peng, Benjamin Below A/L Kenny, Terresa Tanjun anak Samuel. Nuar Adrian Aaron Zawier. So, this is a variety of races and also ethnicities, but I cannot release the names in detail to the Honourable Member. I want to state here firmly that PERMATA consists of various races. We find that the names I have mentioned are examples of names that show they consist of various races and ethnicities in this country. So, whatever the Honourable Member's views, there is no need for wrong perceptions because PERMATA is for the country, for the nation's future.

Thank you, Mr Speaker. Whatever the perceptions and views of my friends over there, PERMATA is still a good programme in this country. My supplementary question is, what are the mechanisms and plans of PERMATA in an effort to build them, and is there indeed a proposal to build PERMATA centres throughout the country, especially in every parliamentary constituency? My question is brief, thank you.

The answer is brief, but before that I want to tell the Honourable Member that there are 15 areas where kindergartens have not yet been established, whether by KEMAS, PERPADUAN or PERMATA. The Honourable Prime Minister is concerned about this matter and has directed that kindergartens be set up in these areas, namely in Padang Serai, Bagan, Bukit Bendera, Jelutong, Bayan Lepas, Kluang, Sembrong, Kota Tinggi, Tebrau, Tanjong Piai, Kepong, Wangsa Maju, Lanang, Selangau, Hulu Rajang. These are the 15 that we will build immediately because there are no kindergartens there, and this matter is important. Although the majority of these areas are opposition areas, we must educate our children so that they become calmer, cheerful and able to become outstanding leaders in the future. The government's aim is to ensure that all 222 Parliamentary constituencies have kindergartens, and after that we will continue to add kindergartens because the PERMATA Kindergarten is important, as the curriculum formed through kindergartens is now being used by the government and the private sector. InshaaAllah.

Koh Nai KwongMCA · BNAlor Gajah · questionEN

7. Datuk Koh Nai Kwong [Alor Gajah] asks the Minister of Urban Wellbeing, Housing and Local Government to state how effective the Safe City Programme has been so far and how many Safe City Programmes have been established.

Datuk Halimah binti Mohd SadiqueUMNO · BNDeputy Minister of Urban Wellbeing, Housing and Local Government · TenggaraEN

Thank you, Honourable Dato' Seri Dr. Mr Speaker, a little long this, Mr Speaker. Thank you to the Honourable Member from the Alor Gajah area. I would like to inform the Honourable Member that under the Government Transformation Programme (GTP), the National Key Results Area (NKRA) on reducing crime, the Ministry of Urban Wellbeing, Housing and Local Government (KPKT), through the Department of Town and Village Planning of Peninsular Malaysia (JPBD), has implemented the Safe City Programme from 2010 until now. For the information of the Honourable Member from Alor Gajah, this Safe City Programme was established on the directive of the Cabinet on 28 January 2004; the Honourable Member and KPKT have already been directed to prepare the Safe City Programme by creating a safer urban environment under the Department of Town and Village Planning. For the information of the Honourable Member, from 2010 until 2012, a total of 1,295 hotspot areas. In 151 local authority areas in Malaysia, the Safe City Programme has been made a standing agenda item in the full council meetings of local authorities. For the information of the Honourable Member also, at the same time, a total of 18,102 street lights have been installed, whether new or upgraded, 2,460 security mirrors, 281 km of guardrails or bollards to separate pedestrian walkways and motor vehicle lanes, three security alarms, 1,165 PDRM security signboards and 34,813 units of locked motorcycle parking have been installed in the hotspot areas that I mentioned earlier.

Datuk Halimah binti Mohd SadiqueUMNO · BNDeputy Minister of Urban Wellbeing, Housing and Local Government · TenggaraEN

Based on the GTP 2012 Annual Report, the street crime index overall was reduced by 35 per cent in 2010, 40 per cent in 2011 and followed by 41 per cent in 2012. Starting from this year 2013, Mr Speaker, under GTP 2.0 the NKRA on reducing crime for the Safe City Programme, a further 64 blackspots have been whitened to enhance the public's perception of safety. Apart from that, all whitening activities and programmes are implemented in an integrated and smart collaboration between government agencies, namely local authorities, PDRM, AADK, the Immigration Department, the Department of Youth and Sports, the Ministry of Women, Family and Community Development and specifically the local community. Overall, Mr Speaker, the perception of safety that has been created in the whitened blackspot areas has increased by 61 per cent compared with 34 per cent before this whitening programme was carried out. Thank you, Mr Speaker.

Datuk Koh Nai KwongMCA · BNAlor GajahEN

Thank you. I also take this opportunity to welcome the presence of the Heads of the Bagan Serai Division UMNO Women's Wing Branches. Welcome to Parliament [Applause] Thank you to Mr Speaker. Thank you also to the Honourable Deputy Minister for his answer just now. My supplementary question is whether the government intends to promote the 15-Step Safe City Book in visual form, namely videos that can be downloaded and shared on media such as YouTube, Facebook, Twitter, Instagram and so on, so that the public obtains complete information about the Safe City Programme mentioned earlier. Thank you.

Thank you to the Honourable Member from Alor Gajah. The Honourable Member's proposal is a very good one and I will take it forward for action by the Department of Town and Village Planning. Thank you, Honourable Member.

Thank you, Honourable Member, Mr Speaker, and thank you, Honourable Deputy Minister. My question is simple and brief, namely in the ministry's study, is a list made showing which town is the least safe and which is the second least safe, the third least safe, the fourth least safe, and conversely the safest towns, which town is the second safest and so on, so that we get a picture and can understand where to focus on the process of implementing the government's aim as the Honourable Deputy Minister informed us earlier. Thank you.

Thank you, Mr Speaker. I would like to inform the Honourable Member from the Tumpat area, yes. In 2010, the implementation of the Safe City Programme measures focused only on 12 local authority hotspot areas, Honourable Member, and it involved four states, namely Kuala Lumpur – one local authority, Selangor has six local authorities, Johor has three local authorities, Penang has two local authorities. Of these 12 hotspot areas, all the necessary measures under the Safe City Programme have been implemented. For the information of the Honourable Member, apart from that, the ministry also implements a safe city monitoring system, namely a system using the Geographic Information System (GIS) and crime mapping, with permission, which is already in operation and can determine additions to GTP 2.0 for 2013 until 2013, apart from the 12 local authorities I mentioned earlier that are in hotspot areas. For 2013 until 2015, Honourable Member, a further 35 initiatives will be carried out in the hotspot areas that have been identified. I will provide information about the existing safe cities that have been put in place. They are located in a District Council, the smallest one, which we did not expect, that is among the local authorities that have been able to implement the Safe City Programme and are in a safe condition according to the level of satisfaction among residents in that urban area. I hope, Mr Speaker, that for 2014 there are 44 blackspot areas that we have identified and will continue. Apart from that, for 2015, Honourable Member, a further RM125 million will be allocated to monitor the Safe City Programme in 50 more local authority areas. Thank you, Honourable Member, for your concern. Thank you.

Teo Nie ChingDAP · PHKulai · questionEN

8. Puan Teo Nie Ching [Kulai] asks the Minister of Home Affairs to state the findings of the investigation into the riot incident involving approximately 800 foreign workers at JCY HDD Technology Sdn. Bhd. factory in Kulai.

Dato Sri Dr. Haji Wan Junaidi Tuanku JaafarPBB · BNDeputy Minister of Home Affairs · SantubongEN

Thank you, Mr Speaker. Mr Speaker, the police are conducting an investigation into the incident that occurred at the factory of the company JCY HDD Technology Sdn. Bhd. in Kulai Jaya, Johor, involving a riot by the company's workers related to palm oil. Report 17182014 is being investigated under section 148 of the Penal Code for rioting among workers. A total of 55 workers involved in the fight were arrested, comprising 52 Nepali nationals, two Bangladeshi nationals and one Vietnamese national. The investigation papers were referred to the Public Prosecutor and the instruction to charge all suspects was issued on 9 September 2014; a total of 15 persons were charged under section 145 of the Penal Code for being directly involved in the fight. All those charged pleaded guilty and were sentenced to 14 months' imprisonment. A total of five persons were charged under section 6(1)(c) of the Immigration Act and a total of 35 persons were deported, returned to their country of origin.

Dato Sri Dr. Haji Wan Junaidi Tuanku JaafarPBB · BNDeputy Minister of Home Affairs · SantubongEN

The police investigation also found that the cause of the incident was due to misunderstanding and lack of understanding among the workers, and there were no elements of misconduct by the employer. The fight also did not involve a total of 500 workers as claimed by the Honourable Member. Thank you, Mr Speaker.

Puan Teo Nie ChingDAP · PHKulaiEN

Thank you, Mr Speaker. I think in this case the employer was indeed not found guilty of any offence, but I want to ask. According to the records of the Royal Malaysia Police (PDRM), how many reports have ever been made by foreign workers against their employers, whether they were abused or mistreated, and what action was taken, how many cases were brought to court against employers who abused or mistreated foreign workers? Thank you.

Mr Speaker, this question is specific. The Honourable Member's question as a whole goes beyond this question, so I need to give Notice. Thank you.

Puan Hajah Normala binti Abdul SamadUMNO · BNPasir GudangEN

Thank you, Mr Speaker. My question is, workplace harmony is very closely related to workers' satisfaction and also to surrounding conditions. Accordingly, what guidelines or standing orders have been issued by the ministry to countries that supply workers, which must be signed by the workers and also by employers, to avoid the same thing happening again? That is all, thank you.

Mr Speaker, this question is also off-track. It has gone off course because this question is specific to the riot in Kulai, namely the workers transferred from Tebrau to Kulai. I do not wish to make a full announcement on this case because five cases are still being tried, and the ambassador of that country regarding the five persons charged under section 6(1)(c) is still before the court. Whatever I say here as facts may prejudice- perhaps the court or the sub judice matter for the judiciary later. Thank you.

Ong Ka ChuanMCA · BNTanjong Malim · questionEN

9. Dato' Seri Ong Ka Chuan [Tanjong Malim] asked the Minister of Agriculture and Agro-based Industry to state whether the government has plans to open more Agro Pasaraya across the country to help farmers market their produce quickly, so that consumers can buy fresh agricultural products.

Dato' Haji Tajuddin bin Abdul RahmanUMNO · BNDeputy Minister of Agriculture and Agro-based Industry · Pasir SalakEN

In the name of God, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Greetings of peace, greetings of 1Malaysia. Thank you Mr Speaker, thank you to the Honourable Member from Tanjong Malim. The question was brief and my answer is also brief. He wanted to know how many Agro Pasaraya have been established. We are in the process of construction. Three Agro Pasaraya are nearly completed, and apart from that we have plans until 2020 to build Agro Pasaraya in every state. In addition, there are plans to build 277 Peladang Mart, and another 87 will be built by NEK Mart- the market of the National Fishermen's Association. Thank you.

Dato' Seri Ong Ka ChuanMCA · BNTanjong MalimEN

Thank you Mr Speaker. My supplementary question to the Honourable Deputy Minister is whether the government has plans to negotiate with, for example, highway concessionaires so that recreational and rest areas can be established as agro-marketing places, because for agricultural entrepreneurs, marketing has always been a major problem or a major obstacle. So if we can establish more places where they can market their agricultural produce, I think this would greatly help them. That is all.

Thank you Honourable Member. At present, too, a lot of space has been provided at the R&Rs along the highways, where agricultural produce is sold and is well received by the public.

I notice that every time we stop at an R&R, the buying and selling of agricultural products, agricultural produce, seems to be very good. I think there is no major problem regarding the marketing of this agricultural produce. For now we see that we have farmers' markets, permanent farmers' markets, fishermen's markets and so on, across the country. So what we are doing is in addition to providing marketing access for this agricultural produce.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

Thank you Mr Speaker, thank you Honourable Deputy Minister. Agro Pasaraya was established with the aim of collecting, the collection and distribution of agricultural produce, and also to overcome manipulation by middlemen, and it is not merely about selling fresh goods but also has various items. That is why it is called a supermarket. The only issue that society is facing now is the shortage of ST15 rice supply in the market. I am not sure whether Agro Pasaraya has it or not, whether there is enough or not ST15 rice supply. This is an issue that has dragged on for a long time; to date, 40,000 metric tonnes a month is allocated. So I want to get an explanation: does the government not intend to allocate the ST15 rice quota to this Agro Pasaraya through NAFAS so that it can pack the goods itself for distribution to retailers, not only at Agro Pasaraya but all the way to the villages.

Subsidised rice is not sufficient because the Honourable Member also eats the same [Laughter] Subsidised rice is for the poor, for village people. Not for the Honourable Member. What rice do you test for eating? Only wearing a balun, so we don't know what rice.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

Honourable Member, I do not eat ST15 rice.

Tidak makan?

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

I eat ST10 rice.

Oh! I see. Which rice is that?

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

ST10 rice. It doesn't matter which product, there are various ones, but the issue I asked just now is...

This is smuggled rice from Siam.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

No need to ask again, Honourable Member.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

...Meaning that the rice should be available in the market. Now that rice is not available in the market.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

40,000 metric tonnes are not available in the market.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Pokok Sena, there is no need to follow the style of the Honourable Member for Kota Kinabalu, Honourable Member.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

No, not because he himself did that style. So the Honourable Deputy Minister himself stood up with the style, calling me to also join in his style.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Sit down, Honourable Member.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

That is why I enjoy the style of the Honourable Deputy Minister.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Mr Speaker, the Kota Kinabalu style is good.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Look at that style. That is the wrong style, Honourable Member.

Honourable Member, I was only joking, teasing my friend from over there. What I meant in my message is that the rice is sufficient, but the problem is that its distribution goes to consumers who are not our target, such as foreign migrants and so on, who also buy this rice. As for the sellers, we cannot control the shops that sell this, to whom it is sold. Are we going to wait at the shop?

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

No, the issue is not the sellers. The issue is not foreign migrants.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Pokok Sena. Honourable Member.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

...The issue is the manufacturing company that gets the quota...

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, appearing on TV outside the Standing Orders is not proper, Honourable Member.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

...It is opened, he does something else, sold to make that rice into ST5 and ST10 rice. This is the issue.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

This is outside the Standing Orders.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

This is the issue. It is not the problem of undocumented migrants coming to buy and so on.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Please sit down, Honourable Member. Honourable Member for Pokok Sena, sit down.

Dato' Haji Mahfuz bin OmarAMANAH · PHPokok SenaEN

Some people take the opportunity to get money from thin air.

There are two more minutes. Two minutes left to go on TV [Laughter] No, just now the Honourable Member raised that these rice are not available in the market. That means the supply is not sufficient. I would say the supply is sufficient, 40,000 metric tonnes if I am not mistaken. This amount is sufficient, but the problem is that some villagers and so on cannot get it because the rice has been sold to, for example, foreign migrants, restaurants and so on. So it is not sufficient. So the ministry will look at or impose strict conditions so that shops selling this rice sell it to Malaysians who are entitled to buy it, not to others. And I also want to say about earlier, whether the supply at this Agro Pasaraya is sufficient. The Honourable Member did not hear that, that is the point. How can the question of sufficient or not arise when the supermarket is not even finished [Laughter] If it is finished tomorrow, then we can talk about whether it is sufficient or not. Next time listen carefully, okay. Thank you.

Mohd Hatta bin Md. RamliAMANAH · PHLumut · questionEN

10. Dr. Mohd. Hatta bin Md. Ramli [Kuala Krai] asked the Minister of Plantation Industries and Commodities to state: (i) the measures taken to halt the collapse of rubber prices that is affecting the livelihood of smallholders; and (ii) specific efforts to continuously help smallholders in order to increase their income.

Puan Noriah binti KasnonUMNO · BNDeputy Minister of Plantation Industries and Commodities · Sungai BesarEN

In the name of God, the Most Gracious, the Most Merciful. Thank you Honourable Member for Kuala Krai. Mr Speaker, for the information of the Honourable Member, the price of rubber, like other commodities, depends on demand and supply in the international market.

Puan Noriah binti KasnonUMNO · BNDeputy Minister of Plantation Industries and Commodities · Sungai BesarEN

In this regard, following the sluggish economic growth in major importing countries such as China and the European Union, rubber prices have recorded a downward trend since January 2014.

Puan Noriah binti KasnonUMNO · BNDeputy Minister of Plantation Industries and Commodities · Sungai BesarEN

Malaysia is the sixth largest producer of natural rubber in the world, contributing only 6.7 per cent of the total world supply of natural rubber. Therefore Malaysia cannot alone influence rubber prices in the market. Mr Speaker, in Budget 2015, the government has allocated RM106.4 million to increase the price received by smallholders at the level through the implementation of two main mechanisms, namely: (i) RM6.4 million to implement a price control mechanism at the estate level through the involvement of cooperatives. In this mechanism, cooperatives will buy rubber from smallholders and sell directly to processing mills. With this, the marketing chain will be shortened. [Mr Speaker chaired the Sitting] (ii) An allocation of RM100 million to implement the Production Incentive for Rubber, or IPG, to encourage smallholders to continue tapping when rubber prices are low in the market. In this mechanism the government provides a production incentive of 30 sen per kilogram for scrap rubber with 50 per cent dry rubber content and 90 sen per kilogram for latex. 100 per cent dry rubber content. The implementation of these two mechanisms will help smallholders deal with the impact of the fall in rubber prices on their income. Mr Speaker, internationally Malaysia has proposed a ministerial-level meeting among ANRPC countries, or with permission, the Association of Natural Rubber Producing Countries, in the first quarter of 2015. This aims to discuss policies to balance supply and demand, where ANRPC countries contribute nearly 93 per cent of the world's natural rubber production. In addition, ITRC, or with permission, the International Tripartite Rubber Council, will meet on 20 November this year. ITRC members consist of Malaysia, Indonesia and Thailand. These three countries currently produce nearly 64 per cent of world production. The objective of this meeting is to determine the steps that must be taken by the three countries to curb the fall in rubber prices. Mr Speaker, for question (b) regarding the enquiry on assistance to smallholders. For the information of the Honourable Member, the Ministry of Rural and Regional Development through RISDA plays an important role in helping smallholders. Among the efforts that have been and will be carried out by RISDA to help safeguard the welfare of rubber smallholders and increase their income are as follows: (i) reducing the price of rubber seed and fertiliser; (ii) providing tapping equipment assistance through the Rubber Retention Programme (PPG) and the Rubber Productivity Intensive Scheme (SIPG); (iii) shortening the marketing chain through the Marketing Infrastructure Development Programme; (iv) expanding basic agricultural infrastructure; (v) practising GAP, or with permission, Good Agriculture Practices; (vi) introducing LITS, with permission, Low Intencity Tapping System or Sistem Torehan Kekerapan Terendah; (vii) training new entrepreneurs through entrepreneurship programmes; (viii) promoting additional economic activities; (ix) increasing dividend distribution through RISDA-owned companies; and

Puan Noriah binti KasnonUMNO · BNDeputy Minister of Plantation Industries and Commodities · Sungai BesarEN

(x) implementing the Smallholders' Living Assistance Programme, or SHPK. That is all, thank you Mr Speaker.

Mr SpeakerEN

Honourable Members, the session for questions for oral answer has ended. The Honourable Member for Arau moves a motion under Standing Order 12(1). [The time for Questions for Oral Answer has ended.]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Dato’ Seri Shahidan bin KassimPAS · PNMinister in the Prime Minister's Department · Arau

Tuan

Speaker, I request to proposeEN

"That, pursuant to Standing Order 12(1), today's Sitting shall not be adjourned until 9.30 pm and thereafter the Sitting shall be adjourned until 10 am on Wednesday, 19 November 2014. Thank you."

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

Mr Speaker, I beg to second.

Mr SpeakerEN

Thank you, Honourable Members, I now put the question to the House for decision. The question is that the motion as moved just now be agreed to.

[Motion put for decision; and agreed to]

Mr SpeakerEN

Is the Honourable Member for Pandan present? Is the Honourable Member for Pontian present? Thank you.

Mr SpeakerEN

Honourable Members, on Tuesday, 11 November 2014, I received a Notice of Motion under Standing Order 26(1)(p) from the Honourable Member for Pandan to refer the Honourable Member for Pontian to the Committee of Rights and Privileges. Based on the motion in the notice, in my view the intention of the Honourable Member for Pandan is actually to refer directly to Standing Order 36(12) because the Honourable Member for Pontian is said to have made a misleading statement to the House. In the motion, the Honourable Member for Pandan states that a statement was issued by the Honourable Datuk Haji Ahmad bin Haji Maslan, Deputy Minister of Finance, as Member of Parliament for the constituency of Pontian, which statement was made on 6 November 2016. The statement made by the Honourable Member for Pontian is characterised by the Honourable Member for Pandan as a falsehood and therefore it also misleads the House. Honourable Members, for the purpose of being fair to all parties, I have requested the documents and evidence submitted to me by both of these Honourable Members.

Mr SpeakerEN

Having considered all the evidence before me and in order to satisfy myself that all matters have been taken into account, I have decided that further explanation is required from the Honourable Deputy Minister on the matter. But before that, I will ask the Honourable Member for Pandan to read out the motion. Please proceed.

The original motion that was submitted, is it?

Mr SpeakerEN

Yes, as per the notice.

I don't have it with me.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the microphone]

It wasn't there yesterday. This one is here.

Mr SpeakerEN

Other Honourable Members, please be quiet. This matter is serious.

Thank you Mr Speaker. I will read the motion as follows, okay. That this House has taken note that in the Official Report of the Third Meeting of the Second Session of the Thirteenth Parliament for the date of 6 November 2014, a statement was issued by the Deputy Minister of Finance and Member of Parliament for Pontian, Datuk Haji Ahmad bin Haji Maslan, at 2.40 pm in this honourable House, namely, "I wish to further emphasise that the government only gave a guarantee on the 1MDB sukuk of RM5.8 billion, whereas all 1MDB debt is RM36.25 billion, there is no letter at all. That is all that is guaranteed by the government; for the other loans only RM5.8 billion receives the explicit guarantee of the Malaysian government. Another matter mentioned about the Letter of Support actually does not exist." This is a falsehood and has misled this House, and in accordance with Standing Orders 36(12) and 80A, this conduct is contemptuous of the House and he should have been referred to the Committee of Rights and Privileges for this offence. Thank you Mr Speaker.

Mr SpeakerEN

Please, please continue with your argument, because the Honourable Member has sent documents to me. So if I read those documents to all Honourable Members, it is not proper. Let the Honourable Member explain in detail where the falsehood occurred. Please proceed.

Yes, Mr Speaker, I will start briefly with the background before I argue to the House.

Mr SpeakerEN

About 10-15 minutes.

10-15 minutes, thank you Mr Speaker.

The actual amount of this 1MDB loan, which is a company wholly owned by the Federal Government, needs to be known by the people because it carries financial liabilities for the Federal Government. Because there has been no clear answer, it has attracted public attention. Yesterday and today all mainstream media have had to respond and provide explanations. Even that still has not given the true figure of the actual financial liability faced by the Federal Government. Therefore in this session, Members of the Dewan Rakyat have submitted various questions, especially from the Honourable Member for Petaling Jaya Utara regarding financial liabilities and also the extent of risk that has been taken by the Federal Government. The answers given by the Honourable Deputy Minister of Finance have caused further confusion because the answers given in this House differ from other answers. Therefore, my motion, Mr Speaker, is in fact specific to two matters. First, is it true that the Federal Government has issued a letter of support to holders of the USD3 billion bonds issued by 1MDB?

That is the important point. Firstly, whether or not it is true, a Letter of Support was issued, because that is the question raised by the Honourable Member for Petaling Jaya Utara. The Honourable Member for Petaling Jaya Utara obtained a document whose authenticity could not be confirmed. So the Honourable Deputy Minister was asked whether it is true that a Letter of Support like this was issued. That is the first question the House needs to decide. Second, is it true that the contents of the letter of support state that the Federal Government has a liability to inject funds to meet the responsibilities of 1MDB if 1MDB is unable to pay the bond amounting to USD3 billion. There are only two important questions. Whether or not a letter of support was issued, because this matter has been circulating outside, and second, if there was a letter of support, whether it is true that if 1MDB cannot pay, the ultimate liability will fall on the government. So, Mr Speaker, in my document I have proposed to Mr Speaker that, based on these two matters, Mr Speaker should determine whether the statement of the Honourable Deputy Minister of Finance on 6 November 2014 violated Standing Order 36(12). Four considerations must therefore be taken into account by Mr Speaker and also by the House. First, whether there existed a Letter of Support issued by the Federal Government to the holders of the 1MDB bond whose contents were the same as those read out by the Honourable Member for Petaling Jaya Utara, as recorded on page 53 of the Official Report dated 6 November 2014. Was there or was there not such a letter? The second consideration, Mr Speaker, is whether the Honourable Deputy Minister of Finance knew and was aware of the existence of the letter of support and its contents as stated by the Honourable Member for Petaling Jaya Utara. If he did not know and was not aware, then I do not consider it a violation of the rules because there was no intention. He did not know. So determining whether or not he knew of the existence and contents of the letter is an important consideration that must be taken into account by Mr Speaker and the House. The third consideration is whether the entire debate at that time in the Dewan Rakyat (House of Representatives) on 6 November 2014, between the Honourable Member for Petaling Jaya Utara and the Honourable Deputy Minister, as contained on pages 53 and 54 of the Official Report, referred specifically to the specific letter of support mentioned by the Honourable Member for Petaling Jaya Utara and not to other letters or other guarantees or other matters. This matter is important because my motion refers to the specific letter of support brought by the Honourable Member for Petaling Jaya Utara. It is not a question of whether its meaning is different or its liability is different. The Honourable Member for Petaling Jaya Utara asked a specific question: is there or is there not a letter of support? It was then answered by the Honourable Deputy Minister: there is none. Therefore Mr Speaker needs to determine whether the debate at that time specifically referred to that specific letter of support. The fourth consideration is whether the Honourable Deputy Minister of Finance did indeed deny the existence of the specific letter of support referred to by the Honourable Member for Petaling Jaya Utara, as recorded in the Official Report, page 54. So, to quickly present some evidence, Mr Speaker. The first matter, namely whether a letter of support existed or not: The Edge newspaper, 8 November 2014, two days after the Honourable Deputy Minister denied the existence of the letter of support, reported that the letter of support did indeed exist. On 10 November 2014, Monday, a few days after the Honourable Deputy Minister denied the existence of the letter, I distributed in full the 140-page agreement, which I have also included in the document to Mr Speaker, showing that there is indeed a section in the agreement on the specific letter of support as mentioned by the Honourable Member for Petaling Jaya Utara and reported by The Edge. On 11 November 2014, after The Edge's disclosure, the Honourable Deputy Minister of Finance made a statement acknowledging the existence of that specific Letter of Support, which differed from the denial made in this House.

Then, the report letter was also reported by Radio Televisyen Malaysia (RTM) that the Honourable Deputy Minister of Finance acknowledged that the government did provide a specific report letter. So, the statements of the Honourable Deputy Minister of Finance made after the newspapers and also the Members from Pakatan Rakyat disclosed the USD3 billion bond agreement ultimately acknowledged that the specific letter of support did exist. Evidence for the second matter, Mr Speaker, whether he knew or was aware or not, that the specific letter of support did exist. There are two media statements made by the Honourable Deputy Minister of Finance. One, dated 8 November 2014, and the second, 12 November 2014. I quote the statement dated 8 November 2014, paragraph 4. The Honourable Deputy Minister of Finance said the following: "I also understand that there is a letter of support issued by the Government of Malaysia for the bond amounting to USD3 billion. However, it does not provide an explicit guarantee of the Government of Malaysia." Based on his acknowledgement in his own statement, it confirms that the Honourable Deputy Minister of Finance knew and was aware of the existence of a Letter of Support and its contents as stated by the Honourable Member for Petaling Jaya Utara, and he has not denied it until now. The third matter of evidence: whether the entire debate at that time referred to a specific Letter of Support and not to a guarantee, whether explicit or implicit. In the debate on 6 November, the Honourable Member for Petaling Jaya Utara, to ensure the Honourable Deputy Minister truly knew that he was referring to that specific letter, read out excerpts of the contents of the letter of support. This means that throughout that debate the Honourable Deputy Minister of Finance did not rebut, did not correct, did not deny, but instead continued his argument by denying the existence of the letter whose contents had been specifically read out by the Honourable Member for Petaling Jaya Utara. Therefore, if one checks the Official Report, pages 53 and 54, it is clear that the entire debate on that day revolved around a specific Letter of Support. Hence the Honourable Deputy Minister of Finance should not have diverted attention by saying that the Letter of Support is not a guarantee, because my motion is not about whether it is a guarantee or not under the government act. My motion is whether or not that letter exists, which the Honourable Deputy Minister of Finance denied in this House although he knew and was aware of the existence of that letter.

Lastly, after we have that background, we need to review again whether his conduct in this House was correct. The Deputy Minister of Finance denied the existence of that specific Letter of Support. The House may refer to page 54 of the Official Report. I am sure Mr Speaker has also seen that the Deputy Minister of Finance denied it twice, not once. When asked through an interjection by the Honourable Member for Petaling Jaya Utara, "No Letter of Support?", the Honourable Member for Petaling Jaya Utara asked. The Deputy Minister replied, "There is no letter of any kind. Only this one can answer, RM5.8 billion." Remember, "There is no letter of any kind." Whereas the Honourable Member for Petaling Jaya Utara asked specifically about the Letter of Support, referring to that specific Letter of Support. Subsequently, the Deputy Minister of Finance continued and repeated that statement by saying another thing mentioned about the Letter of Support, which in fact did not exist. These two statements made clearly deny the existence of the letter of support that was mentioned and raised in this House. So Mr Speaker, I want to conclude with the following. The four matters that Mr Speaker must consider in this House, as I have explained in the document I submitted, prove that the Deputy Minister of Finance knew all the facts about the letter of support. At first I thought the Deputy Minister of Finance did not know, perhaps it was hidden from him, so his statement may have been made while he had no information.

However, his statements confirm that he knew all the facts about the letter of support. He also knew that the letter of support existed, and he also understood the specific question asked by the Honourable Member for Petaling Jaya Utara. Yet, he still made two statements that were untrue and contrary to the facts, which he himself eventually acknowledged in his subsequent statements. Taking these matters into account, I respectfully submit that there is a strong basis for the Deputy Minister of Finance to be subject to action in accordance with Standing Order 36(12). Thank you, Mr Speaker, for your consideration [Applause]

Mr SpeakerEN

Honourable Member for Pontian, please. Other Honourable Members, this matter is serious. I will take time to examine everything. Please.

Datuk Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

Assalamualaikum warahmatullahi wabarakatuh, peace greetings, 1Malaysia greetings. Mr Speaker, the matter raised by the Honourable Member for Pandan is based on my statement when answering the question of the Honourable Member for Petaling Jaya Utara during the policy-level winding-up session for the Ministry of Finance on 6 November 2014 regarding the issue of 1Malaysia Development Berhad or 1MDB, as follows. The Hansard excerpt of Thursday, 6 November 2014 which reads... [Reading the excerpt] "I wish to emphasise once again that the government only provided a guarantee for the sukuk by 1MDB amounting to RM5.8 billion. Whereas all 1MDB debts total RM36.25 billion. There is no letter of any kind. That is the only thing guaranteed by the government. There is nothing more than that. Apart from that, 1MDB did not receive guarantees from the government for other loans. Only RM5.8 billion received the explicit guarantee of the Government of Malaysia. Another matter mentioned about the letter of support is in fact non-existent." When I said, Mr Speaker, that there is no letter of support, what I meant was that there is no other letter of support that provides an explicit guarantee of the Government of Malaysia apart from the amount of RM5.8 billion. Until today, I still hold to that statement as true, and I also issued a press statement meeting with reporters dated 8 November 2014, Saturday, at the Ministry of Finance, as the following statement... [Reading the excerpt] "As I explained in Parliament on Thursday, 6 November 2014, the government guarantee issued for 1MDB is only RM5.8 billion. I wish to inform here that there is indeed no letter that carries the meaning of a guarantee greater than that amount. The government has not issued any other guarantee apart from RM5.8 billion for 1MDB or its wholly-owned subsidiaries, including for the USD3 billion bond. As reported in 1MDB's annual report for the financial year ended 2014, a letter was issued as the sole shareholder of 1MDB. Under the terms of that letter, should 1MDB be unable to repay the debt relating to the bond in question, any claims against the government, other than claims against 1MDB, are limited only to the terms stated in that letter and this does not constitute a government guarantee." I also made a three-page press statement at the press conference outside this House on 12 November 2014 to further clarify my earlier statement. The purpose of the two press conferences was to confirm that I had no intention to mislead any party.

Datuk Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

Among other things, in the second press conference I mentioned that there is a Letter of Support issued by the Government of Malaysia for the bond amounting to USD3 billion. However, it does not provide an explicit guarantee of the Government of Malaysia. A Letter of Support means that if 1MDB is unable to pay the loan amounting to USD3 billion, then 1MDB must restructure its assets to repay the debt. In this matter, 1MDB would need to use all its assets amounting to RM51.4 billion to pay the debt valued at USD3 billion. The government is confident that the USD3 billion bond can be paid with assets of a much greater value. Therefore, the government only provided a letter of support, not a letter of guarantee. As of today's record, 1MDB has never failed to settle its debt according to the repayment schedule. The government will only assist if there are further liabilities for the debt that need to be settled by 1MDB should all steps to restructure assets have been taken by 1MDB. I want to explain that an explicit guarantee is bound under the Loan Guarantee (Corporations) Act 1965. A company that is given a guarantee must be gazetted as a Corporation, whereas the letter of support issued in the 1MDB issue to related parties is not bound under that Act and does not need to be gazetted. 1MDB is a company, with permission, a going concern that is competitive and progressing, which means 1MDB will always grow and its company value will always increase. This is proven by the increase in its income by 64 per cent for the year ended 31 March 2014. The matter I stated in this House on 6 November 2014 clearly shows that the government guarantee is only for the loan amounting to RM5.8 billion. This guarantee is bound under the Loan Guarantee (Corporations) Act 1965. Therefore, only the amount of RM5.8 billion is included in the government's contingent liabilities and not added to the USD3 billion. Accordingly, I wish to correct the understanding of my statement in this House dated 6 November 2014 which reads, "There is no letter of any kind. Another matter mentioned about the letter of support is in fact non-existent" by adding the following sentences, "There is no other letter of guarantee of any kind. Another matter mentioned about the letter of support that provides another guarantee is in fact non-existent."

Datuk Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

Mr Speaker, I accept the error of omitting those six words, which caused the misunderstanding.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Ketawa]

I had no intention whatsoever to mislead the House. Truly, what is good comes from God, and what is weak comes from His servant. Apologies and thank you.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Tepuk]

Mr SpeakerEN

Honourable Members. Honourable Members, that is why each time I remind you that when debating, your arguments must be accompanied by accountability, because matters like this will arise. Standing Order 36(12) is not a matter as simple as you think, Honourable Members, because it is related to a Member's integrity. But it has become our culture in this Malaysian Parliament that at the slightest provocation people stand up for 36(12). Whereas 36(12) relates to integrity as an Honourable Member. That is why when I received notice from the Honourable Member for Pandan, I knew what had happened on the 6th of the month because I was the one presiding. I heard everything, I saw all the reactions, I saw the facial expression of the Honourable Member for Petaling Jaya Utara, I saw the answer of the Honourable Member for Pontian. I knew what had happened. Whereas the Honourable Member for Pandan merely read from the Hansard, I know.

Mr SpeakerEN

So I ask the Honourable Member for Pandan for documentary evidence, because I want to know exactly what the Honourable Member for Pandan's argument is. Likewise, I ask the Honourable Member for Pontian as well. From the documents I have, I could make a ruling, but I deliberately did not make a ruling on the documents that are there, because I want to give satisfaction to all Honourable Members as a lesson for everyone. So I invite the Honourable Member for Pandan to argue again, and we will all listen. After that there is a reply from the Honourable Member for Pontian. We will all listen, but the dilemma is mine to decide. However, usually the decisions I make are not all received with an open mind, even though I say the decision is final. If you are not satisfied, move a motion. So once again you have placed me in a dilemma. Even so, we all have our responsibilities. I will carry out my responsibility as fairly as possible. You have all seen it, Honourable Members. Here is my decision. After studying a bundle of documents as thick as this from the Honourable Member for Pandan, which is so detailed, it is as if I were a judge hearing submissions. Then I received a bundle from the Honourable Member for Pontian that is roughly as thick, but still I want to share with what they have done. So, Honourable Members, I take this office seriously, and whatever I say, I will uphold until the end of time. For a Member to be referred to the Committee of Privileges and Liberties, all Honourable Members know there are three criteria that must be met. First, a factual argument that is wrong. When it is realised that the wrong factual argument has not been corrected, and most importantly, from the start of the argument to the end, there is an intention to mislead. Because the rules of this House are based on a statement by a former British Minister. So when we hear all that, do not take into account what documents I have. My decision is that I, who presided at the time of the question-and-answer session, especially when the questions are fired one after another and the one answering sometimes has to answer spontaneously. Perhaps at the time of answering, he had no intention at all. Whether he saw the piles of documents above him or not, wallahualam. However, the press statement mentioned by the Honourable Member for Pontian I have also taken into account, because that material is from him. So when I take all of this into account, even though the view from the other side is that the facts are wrong, I take into account what was said outside the House and so on. Second, whether it was corrected or not, the Honourable Member for Pontian did make a correction afterwards, after several of his members said there was a Letter of Support but it was not mentioned in the House. He himself said that he had no intention whatsoever.

Mr SpeakerEN

Honourable Member, I have not finished yet. He had no intention whatsoever. He had no intention whatsoever to mislead the House. That means he said there were six words that I did not mention at the time because he was being pressed, but when I refer to Standing Order 10(4), Standing Order 10(4) allows Hansard to be corrected by adding sentences, but with the decision of Mr Speaker to permit it. So, taking all of this into account, I am of the view that there is no need to debate it, no need to refer it to anyone, because the Honourable Member has stated that he had no intention at all to mislead the House. However, having said that, as the English say, what this side wanted to say has already been elaborated by the Honourable Member for Pandan. Whatever answer this side gave has also been elaborated by the Honourable Member for Pontian. But I am the one who makes the decision. That is my decision. So I hope this matter is settled, because there was no intention to mislead the House. Thank you.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Tepuk]

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

Mr Speaker, Mr Speaker. Mike, mike, mike.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

I may be able to accept Mr Speaker's view that the Honourable Member for Pontian had no intention to mislead the House, but the statement on that day did mislead the House. He had no intention after stating that he had no intention, but on that day he misled the House even without intent. Misleading without intent is like killing without intent.

Mr SpeakerEN

Please, the Honourable Member for Shah Alam. Other Honourable Members. Please, the Honourable Member for Shah Alam.

Tuan Khalid bin Abd. SamadAMANAH · PHShah AlamEN

Mr Speaker. Thank you, Mr Speaker. I welcome Mr Speaker's decision to adopt a policy of husnudzon, or good faith, towards the Deputy Minister of Finance. Only for me, if the Deputy Minister's error happened only once, where he did not say what he should have said, perhaps I too could share Mr Speaker's good faith. But in this case he left out the core words, twice, and flatly denied a clear and plain question. So I feel, with respect Mr Speaker, that although the decision has been made and I accept it, as for myself, I am doubtful about the true intention of the Deputy Minister of Finance. Thank you.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

As I said just now, killed without intent. He misled without intent. He misled the House without intent. Raping without intent, like that.

Mr SpeakerEN

The Honourable Member for Pokok Sena. Please, the Honourable Member for Sepang. After the Honourable Member for Sepang, the Honourable Member for Petaling Jaya Utara because involved in this. After that I will not accept any more opinions outside the scope that I have explained. Please, the Honourable Member for Sepang.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Okay, thank you to Mr Speaker, thank you to both sides. Just now, when the Minister said there were two guarantees. One that is not subject to the Act. I hope that if I am wrong, you will correct me. I heard the Minister's answer that the RM5.8 billion is an explicit guarantee which is included under the Act, namely the Loan Guarantee (Incorporation of Corporation) Act 1965.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

I want to ask and get an explanation, because if what the Honourable Deputy Minister said earlier is true, that the RM5.8 billion loan is a guarantee subject to the Act, I want to read the Loan Guarantee (Incorporation of Corporation) Act 1965, under section 2, subsection 3...

Mr SpeakerEN

The Honourable Deputy Minister does not need to answer this. Because this is only a side view that I want to entertain. No need to answer. Please...

[Dewan riuh]

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Yes, yes, thank you Mr Speaker. I am not blaming the Minister, no. I actually want to ask, why is it that if we look at section 2, subsection 3, which describes the power to guarantee loans, it states that subject to subsection 4, the Minister shall, as soon as possible after any guarantee under this section is given, lay before the Dewan Rakyat a statement regarding that guarantee together with a copy of the agreement beforehand. I want to ask whether this has been done by the Minister, because it is necessary for this Dewan Rakyat to be presented with that guarantee. Thank you.

Mr Speaker

Sila.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Thank you, Mr Speaker. I would like to thank Tan Sri Speaker for providing the opportunity for this motion to be read in the House, to be spoken, and also for providing the opportunity for the Honourable Deputy Minister and the Honourable Member for Pontian to give further explanation. I think this is a good practice that should be continued, because it will show that nothing is feared by any party, whether the government or the opposition, or even Tan Sri Speaker himself. In this matter I also want to stress that this motion was not brought by my colleague the Honourable Member for Pandan frivolously. This matter was only brought after the debate during the Committee stage, where we once again requested further explanation from the Ministry of Finance, and I debated it that day. However, the questions raised referring to the answer given on 6 November were not given any answer at all. That issue was not brought up. For that reason, the decision was made only to bring the motion on another day, so this motion is brought not because we want to deliberately play games with this matter. This motion is brought because we feel it is important that correct facts are put out in the House. What is said outside the House, anyone can say, but what is said in this House is secret, is seen by all international investors, and this is important in order to respect...

Mr Speaker, may I interrupt?

Mr SpeakerEN

Honourable Members, Honourable Members, sit down, Honourable Member. The Honourable Member for Petaling Jaya first.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

To respect the position of Parliament as the most august sitting in our country. That is all we ask, and I also thank the Honourable Deputy Minister for making the correction and also making the acknowledgement that should be made in this House, and we hope this matter will not happen again.

Mr Speaker

Terima kasih.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

On the issue of whether it is a guarantee or not, we can still debate that. That is fine, but in terms of facts, it must be correct. Thank you [Applause]

Mr SpeakerEN

Thank you. Honourable Members, Honourable Members, this is not a debate. When the Honourable Deputy Minister has replied, it means I have made the ruling. I have made the ruling, but I allowed two or three Honourable Members to stand because that is additional information for me. We do that as a lesson and so on, because if I allowed two or three more Members to stand over there, it would mean debate. It would mean the subject is closed. Secretary, please carry out your duties....

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

That is enough, Tan Sri. Enough, enough, Tan Sri. Enough, I have heard the decision of lying without intent just now [Laughter]

Not allowed, not allowed, not allowed.

Tan Sri Speaker, Tan Sri Speaker...

Datuk Seri Reezal MericanUMNO · BNKepala BatasEN

It must be withdrawn, it must be withdrawn.

Tan Sri Speaker.

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 CommitteeBill

The Order of Business was read to resume consideration of the "Supply Bill 2015 and Development Estimates 2015 in Committee of the whole House". [Sixth Day] [House in Committee] [Mr Speaker chairing the Committee]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 Committee — Head B.27 [Schedule] - Head P.27 [Development Estimates 2014] -Bill

Mr ChairmanEN

Thank you. Head of Supply B.27 and Head of Development P.27 under the Ministry of Works. Please, the Honourable Deputy Minister.

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

Thank you, Tan Sri Chairman. Bismillahir Rahmanir Rahim. First, I would like to take this opportunity to thank the 27 Honourable Members who took part in the debate on the Supply Bill 2015 at the Committee stage for the Ministry of Works. All suggestions, views and criticisms on the issues raised will be given attention and answered as well as possible. Before I answer those issues, allow me to briefly inform you about the 2015 Budget allocation that the Ministry of Works will receive. For the information of Honourable Members, the Ministry of Works will receive a total allocation of RM5.95 billion in 2015. Of that amount, RM2.11 billion is allocated under Vote B.27 Mengurus, and the remaining balance of RM3.84 billion under Item P.27 Pembangunan. To make it easier for Honourable Members to understand, I will divide the Ministry of Works' winding-up answer into five topics as follows: (i) Federal Roads in Peninsular Malaysia; (ii) Federal Road Projects in Sabah and Sarawak; (iii) issues relating to the maintenance of Federal Roads; (iv) toll highway issues including toll compensation; and (v) issues relating to the construction industry and other issues. Tan Sri Chairman, in yesterday's debate, several Honourable Members raised proposals for the construction and upgrading of Federal Roads as follows: (i) the Honourable Member from Parit Sulong asked the government to expedite the construction of the Batu Pahat Second Bridge project;

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

(ii) the Honourable Member from Seputeh requested the construction of a new road connecting Sepang Gold Coast Resort to KLIA; (iii) the Honourable Member from Seputeh also requested the upgrading project of Jalan Industri from Jalan Langat, Klang to Jalan Pelabuhan Barat, from the two existing lanes to a four-lane road; (iv) the Honourable Member from Gerik asked the government to upgrade the main route from Gerik to Jeli and the Gerik to Baling road. For the information of Honourable Members, the Gerik to Baling section was upgraded in 2005; (v) the Honourable Member from Sepang proposed the upgrading project of Jalan Banting to KLIA to Batu Laut be upgraded to a two-way four-lane road; (vi) the Honourable Member from Tanjong asked for consideration of the upgrading project of Jalan Relau to Paya Terubong, Penang, and for the information of Honourable Members, this is a state road and must be applied for through the State Government; (vii) the Honourable Members from Paya Besar and Jerantut raised proposals for the construction of a road to the West Pahang area, namely a new route connecting Jerantut to Kuala Lipis to Cameron Highlands; (viii) the Honourable Member from Lumut applied for the implementation of the following projects: (i) Sultan Yusof Second Bridge, Jalan Teluk Intan to Lumut; (ii) Jalan Segari, Lumut to Changkat Jering-Taiping; (iii) the upgrading project of Federal Road 5 from Sungai Bernam Bridge to the junction of Pekan Sabak Bernam; (ix) the Honourable Member from Pasir Puteh applied for the upgrading project of the main road to Pasir Puteh to Kota Bharu into a two-way four-lane route; (x) the Honourable Member from Sungai Petani raised the New Coastal Road construction project from Teluk Ayer Tawar to Kuala Kedah; and (xi) the Honourable Member from Bayan Baru raised the need for the upgrading project of Jalan Teluk Kumbar to Bayan Lepas. For the information of Honourable Members, these proposed projects have been recorded, checked and will be given attention by this ministry.

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

At present, the Ministry of Works is in the process of identifying lists of new projects to be applied for implementation in the Eleventh Malaysia Plan (RMKe-11), namely from 2016 to 2020. Therefore, I would like to propose that Honourable Members discuss with the state government to ensure the above project proposals are given high priority in the state government's application list under RMKe-11. Mr Chairman, several Honourable Members, including the Honourable Member from Tumpat, the Honourable Member for Kuala Krai, the Honourable Member for Pasir Puteh and the Honourable Member for Setiu, have raised the issue of the need for the East Coast Highway Project phase 3 in the state of Kelantan, LPT3, starting from Kuala Terengganu through Setiu, Besut and then entering the state of Kelantan.

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

For the information of the Honourable Members, the proposed LPT3 Project is indeed included in the government's plans to be implemented in the future. Based on the report of the Peninsular Malaysia Highway Network Development Plan (HNDP) Phase 1, the LPT3 Project has the potential to be implemented through privatisation. The implementation of the East Coast Highway as a whole, involving the states of Pahang, Terengganu and Kelantan, is being carried out in phases. The last phase, which has not yet begun, is LPT3 in Kelantan, and it is expected to begin during the Eleventh Malaysia Plan (RMKe-11). Mr Chairman, the Honourable Member for Tumpat, the Honourable Member for Lipis, and the Honourable Member for Kuala Krai raised the Central Spine Road Project, which involves the alignment from Kota Bharu to Kuala Krai and then onwards to Gua Musang, to Lipis-Raub and also to Bentong. For the information of the Honourable Members, the estimated total cost of building and upgrading the Central Spine Road is RM8.6 billion, namely RM6.6 billion for the Bentong to Kuala Krai alignment and an estimated RM2 billion for the Kota Bharu to Kuala Krai alignment. So far, the government has allocated RM1.4 billion to finance the implementation of the phases that have been approved for this project. In the Tenth Malaysia Plan (RMKe-10), the government's priority is to implement part of package three, namely in the Kuala Lipis area, because this is the area that recorded the highest accident rate compared with the other Central Spine Road alignments. As for the Kota Bharu to Kuala Krai alignment, so far two packages have been approved, namely the Pasir Hor to Kadok and Kadok to Ketereh alignments. The other packages in the Central Spine Road are planned to be implemented in RMKe-11, subject to the government's financial capacity. Mr Chairman, the Honourable Member for Sekijang wishes to know about the duration of the land acquisition freeze for the implementation of a road project. For the information of the Honourable Member, the land freeze under section 4 of the Land Acquisition Act or APT 1960 is intended to carry out a preliminary study to determine the suitability of a particular alignment. The validity period of section 4 is only 12 months from the date the Gazette is declared. If the alignment is found to be suitable, the application plan for land acquisition under section 8 of APT 1960 will be submitted to the Federal Director General of Lands and Mines Department (JKPTG) to be tabled for approval by the State Authority (PBN). If approved by the State Authority (PBN), the section 8 Gazette of the Land Acquisition Act 1960 will be published and the land acquisition process will begin for the implementation of the project. The Honourable Member for Kuala Terengganu requests an explanation on the status of the project to build the Jeram Tok Kong to Bukit Guntong road in Kuala Terengganu, which has been delayed due to land acquisition problems. For the information of the Honourable Member, this matter is being reviewed by the JKR Headquarters since this project is a project of the Terengganu State Government. Mr Chairman, the Honourable Member for Bintulu has raised four proposed road projects as follows: (i) the proposal to upgrade the road from the Ngabau junction, (ii) the proposal to upgrade the road from Tanjung Kidurong to Bintulu Port, (iii) the proposal to build flyovers at Jalan Medan, (iv) the proposal to build flyovers at Simpang Ngabau. For the information of the Honourable Member for Bintulu, the proposals to upgrade the Ngabau junction, to upgrade the road from Jalan Kidurong to Bintulu Port and to build flyovers at Simpang Ngabau were applied for in the Fourth Rolling Plan (RP-4) in 2015 but were not approved. The Ministry of Works will reapply for these projects in RMKe-11 with high priority.

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

Meanwhile, the proposal to build flyovers at Jalan Medan was never applied for by JKR Sarawak before. The Ministry will review the need and priority of this project proposal before we apply for it in RMKe-11. The Honourable Member for Sarikei has also raised the status of four projects as follows: (i) Sungai Siam Bintangor to Tanjong Manis Road; (ii) the proposal for an overtaking lane at kilometre 18 at Sungai Pauh on the Sarikei to Kuching road; (iii) the proposal to upgrade the Jaka Sarikei to Sebangkoi road; and (iv) the proposal for a connecting road from Sarikei to Tanjong Manis. For the information of the Honourable Member for Sarikei, the project to build the road from Sungai Siam Bintangor to Tanjong Manis is a state road and JKR Sarawak will apply under state allocation. As for the Honourable Member's request to build an overtaking lane, it is informed that JKR has implemented an overtaking lane project at kilometre 432 of the Kuching to Miri road, which was completed on 27 July 2013. The location of this overtaking lane is near Sungai Pauh. Regarding the proposal for a connecting road from Sarikei to Tanjong Manis, the Sarawak Planning Authority, better known as SPA, is considering a new alignment, namely the Kampung Seberang-Sarikei Road. Preliminary work for this project, such as land survey and design, is expected to begin in 2015 once SPA's approval is obtained. Mr Chairman, the Honourable Member for Sarikei has also raised the issue of upgrading the road from Pekan Jaka Sarikei to Sebangkoi. That road section is included in the alignment of the Pan Borneo Highway, which will be upgraded by the private sector. However, for the short term, the ministry has already and will continue to improve the road geometry and enhance road safety features on this route under the Safety Programme and black spot, with permission, at Bukit Sebangkoi. The Honourable Member from Tenom has raised the issue of whether the federal road in Tenom is included as an alignment of the Pan-Borneo Highway in Sabah. He also requested that the Padas River Bridge be replaced immediately. For the information of the Honourable Member, the Pan-Borneo alignment in the East Coast area of Sabah will involve the route from Kota Kinabalu to Papar to Beaufort, as well as to Sipitang and onwards to Sindumin, and therefore does not involve Tenom. Nevertheless, the ministry will continue...

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

May the Honourable Member interject?

Please proceed, the Honourable Member for Kinabatangan.

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

We have been told about the Pan-Borneo Road Project. So I would also like to ask whether the Pan-Borneo will also pass through Kota Kinabalu- andakan and to Tawau? This is because the road today is really in very bad condition. It is full of potholes; going to Sandakan-Kota Kinabalu takes five to six hours. So perhaps with the upgrading of this Pan-Borneo road, it may take three and a half hours. Does the Pan-Borneo include the Kota Kinabalu-Sandakan stretch itself? If not, why not?

Thank you, the Honourable Member for Kinabatangan. To answer the question raised, yes, it is indeed included, Honourable Member.

Tuan Pengerusi.

For the information of the Honourable Member, let me answer first, and after this I will give the floor to the Honourable Member for Libaran to continue.

For the information of the Honourable Member, the Kota Kinabalu to Sandakan road is a priority, where Ranau-Sandakan and Sandakan to Tawau are among the three roads that will be given the highest priority for implementation. If the Pan-Borneo Project can be implemented, whether in its conventional approach or with agreement at government level in the privatisation process, Honourable Member. Thank you. The Honourable Member for Libaran.

Datuk Juslie bin Haji AjirolUMNO · BNLibaranEN

Thank you, Mr Chairman, thank you, the Honourable Deputy Minister. I understand the Pan-Borneo is being implemented next year, so I would like to know whether there is an alignment, namely the Libaran cross-link. I understand that the first phase has been approved, which involves four phases, namely phases two, three and four, which have not yet received approval. So, I would like to know whether the Libaran cross-link alignment is included in the Pan-Borneo phase itself, because this road is very important, for traffic in and out not only of Libaran but also in and out of Sandakan city and onwards to the major towns in the state of Sabah. Thank you.

Thank you, the Honourable Member for Libaran. I would like to inform you that this road is not included in the Pan-Borneo alignment, Honourable Member, but it is one of the projects that will be implemented and is a priority at the ministry level. I will give a detailed explanation on the road information provided by the Honourable Member just now.

Mr Chairman, Kuala Kangsar.

Datuk Raime UnggiUMNO · BNTenomEN

Mr Chairman, Tenom.

Mr Chairman

Manakah satu?

The Honourable Member for Tenom. After that, the Honourable Member for Kuala Kangsar.

Datuk Raime UnggiUMNO · BNTenomEN

Thank you, Mr Chairman. Just now the Honourable Deputy Minister stated the alignments that have been included in the Pan-Borneo alignment...

Datuk Bung Moktar bin RadinUMNO · BNKinabatanganEN

Tenom is not included, lah, sorry lah.

Datuk Raime UnggiUMNO · BNTenomEN

There is something I want to tell the Honourable Deputy Minister, the Honourable Member for Kinabatangan. So, it is also unfair if the Pan-Borneo only goes to Sandakan. We must also have something in the interior areas. So, I ask the Honourable Deputy Minister, what about the alignment if Tenom is not included in the Pan-Borneo alignment? What about the roads to the interior areas? There are three parliamentary constituencies in the interior: Tenom, Keningau and also Pensiangan. If we follow the alignment from the constituency of the Honourable Member for Papar to Keningau, Keningau to Pensiangan, Pensiangan to Tawau, will this alignment also become a main alignment in the implementation of the Pan-Borneo to be carried out next year?

As for that question, yes, Honourable Member. That is part of the Pan-Borneo alignment that will be implemented. However, although Tenom is not included in the plan, for your information, Honourable Member, the ministry and also the Sabah State Public Works Department are giving special focus to the roads that were raised by the Honourable Member yesterday, including the roads affected by the recent floods. For your information, our team from the ministry is now in the state of Sabah and will visit your area to obtain more information so that we can ensure the areas raised by the Honourable Member can be implemented immediately. The Honourable Member for Kuala Kangsar.

Thank you, Mr Chairman, thank you, the Honourable Deputy Minister. I want to touch on this Pan Borneo because I see it as a large-scale project, a mega project with a length of 2,300 km and an allocation of RM27 billion. I would like to ask the Honourable Deputy Minister whether the ministry is looking at studies on the use of rubberised roads, the term rubberised roads meaning using rubber product outputs in their components for use in this Pan Borneo Highway? This is because, if we look at it, it can stabilise the price of rubber and also strengthen the price of rubber. If there is no technical or commercial study, I hope the ministry can use this study to give this opportunity to rubber or rubber products because it is on a large scale. It has economies of scale that we can use, because most of what I know is that studies have already been done but were not used because the roads, or the construction of these roads, were considered not to have a large economic scale that could absorb the cost if the use of rubber roads is high. Thank you.

Thank you to the Honourable Member for Kuala Kangsar. I am pleased to inform the Honourable Member that this matter was raised by the Honourable Member for Sekijang and I will answer it shortly. Please be patient, I will inform you afterwards. Mr Chairman, the Honourable Member for Limbang requested the government to replace the old bridges located on the federal road in the state of Sarawak. For the information of the Honourable Members, the Old Bridge Rehabilitation Programme on the Pan Borneo Road in Sarawak will be absorbed to be implemented by the private company that will build the Pan Borneo Highway for the Sarawak alignment. The Honourable Member from Seputeh has also raised the issue of the proposed project to build and upgrade the Belaga to Bakun road in Sarawak. I know the Honourable Member often visits the state of Sarawak. For your information, that road has the status of a state road, Honourable Member, namely it is under the jurisdiction of the Sarawak State Government. Mr Chairman, the Honourable Member...

Puan Teresa Kok Suh SimDAP · PHSeputehEN

May I ask for an explanation? So what this means is that the road from Bakun to Belaga, which is like a roller coaster, was built by our army. I actually heard from the Member of Parliament for Rajang that it would be upgraded by JKR. So, this is not true? So, all this depends on the Sarawak State Government whether it wants to upgrade it or not. Correct?

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Honourable Deputy Minister, actually this is the Hulu Rajang area. The Honourable Member for Seputeh went to my area to see the situation.

Oh! He did not go at all.

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Or perhaps he just wants to disturb me. Thank you, Mr Chairman. Actually, Honourable Deputy Minister, that road is not the Bakun Road. The Honourable Member for Seputeh does not know. Actually, the Simpang Menjawah to Pekan Belaga road was built by the Ministry of Defence, the Projek Jiwa Murni. That is the actual situation. So I have asked the Honourable Minister during the briefing, and the state government and the Ministry of Works, to cooperate to cooperate to upgrade that road. That is all, actually.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

[Speaking without using the microphone]

Thank you to the Honourable Member for Hulu Rajang who has helped me. The Honourable Member gave the wrong alignment, Honourable Member. It was not my fault. So, I will provide the Honourable Member with a written reply. The Honourable Member for Seputeh did not go to Bakun at all...

[Dewan riuh]

Datuk Rozman bin IsliUMNO · BNLabuanEN

Honourable Member, a little, Honourable Member.

Mr ChairmanEN

The Honourable Member for Labuan.

The Honourable Member for Labuan.

Datuk Rozman bin IsliUMNO · BNLabuanEN

Thank you, Honourable Deputy Minister. In Borneo there are states such as Sarawak and Sabah, but there is also actually the Federal Territory of Labuan, which is also located in Borneo.

Mr ChairmanEN

Oh! Is that so, Honourable Member?

Datuk Rozman bin IsliUMNO · BNLabuanEN

[Laughter] That is why you always have to be told, then you remember.

Mr ChairmanEN

I did not notice at all [Laughter] Please.

Datuk Rozman bin IsliUMNO · BNLabuanEN

So, the Pan-Borneo would be more complete or perfect if it were also connected directly to Labuan. So, I hope that if it has not been budgeted, we help to find a budget. If not, this 2015 is in the first rolling plan of RMKe-11. Yesterday I tried to debate the Committee of Supply of this ministry but did not have time and was asked to interject. So, at the same time, I would like to ask about three roads that are very critical and top priority in Labuan, namely the Ranca-Ranca Industrial Area to Kina Benua Road, the Kina Benua to Taman Pearl Road, and the Tanjung Teras to Nagalang Tanjung Aru Road. I just want to ask whether there is an allocation for 2015. Thank you.

Thank you, the Honourable Member for Labuan. If I do not have time to answer during this session, inshaaAllah I will answer in writing regarding the status of all three roads raised.

Thank you, Mr Chairman. Mr Chairman, the Honourable Member for Bayan Baru has raised the issue of the allocation for the maintenance of federal roads being much reduced and lower in 2015, namely RM610 million compared with RM1.06 billion in 2014. For the information of the Honourable Member, this is indeed acknowledged because the ministry's original application was higher than the amount approved. However, the 2015 allocation will be used optimally to implement road maintenance programmes throughout the country. The Honourable Members for Sekijang, Jerantut and Bintulu...

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Deputy Minister, a little, please. Mr Chairman, may I interject?

Mr ChairmanEN

The Honourable Member for Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Clarification, please. Honourable Deputy Minister, we already know that with the original allocation last year of more than RM1 billion, roads throughout Malaysia are already in a terrible condition, with potholes, puddles and very inadequate maintenance, a poor state of roads. Now with a 63 per cent reduction, a very sharp drop, how can we maintain roads throughout Malaysia, when there are still so many roads, the same or perhaps even longer? So, this is bad planning, not taking into account the actual situation. This is not creative accounting, down, down, no. This is the reality on the ground: maintaining roads requires money. If there is no money, there is no maintenance. If there is no money, you cannot fill up the potholes; this is the real fact. The Minister has to fight for more allocation. I ask for an explanation.

Thank you, my friend the Honourable Member for Bayan Baru. Actually, Honourable Member, although only RM610 million has been allocated to this ministry for road maintenance compared with RM1.06 billion in 2014, for your information, this does not prevent the ministry from applying for an addition to that allocation at mid-year, and I ask the Honourable Member for Bayan Baru to support the ministry on this issue.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

One more question.

This is because the Honourable Member himself has informed us that this is a necessity, and I am confident and believe that the Barisan Nasional Government is very concerned about this matter.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Just one more question. Thank you, Mr Chairman. We have no problem if it helps to request more allocation, but I want to ask the Honourable Deputy Minister. Is there a reason we are paying too much, RM458 million, for tolls? This is because the allocation of RM458 million for toll compensation has caused the allocation for road maintenance to fall. Because we cannot see that, because the money- we can see that the decrease is roughly equal to- the money is roughly equal to the compensation to the tolls. Was the road maintenance allocation used to pay the toll companies? I request an explanation from the Honourable Deputy Minister.

Thank you, Honourable Member, for raising this issue. Honourable Member, although the allocation has been provided for toll compensation, the Government has still not made a decision on this matter. So, in answer to the Honourable Member's question, it is true that an allocation has been provided under this budget for toll compensation, and compensation, as we know, has increased almost every year. However, at the same time, we also look at the Government's concern over the cost of living of the people, which we may also need to examine carefully. But allow me to answer this toll issue later, Honourable Member, because there are indeed questions raised under this toll issue.

Datuk Jumat bin Haji IdrisUMNO · BNSepanggarEN

The Honourable Deputy Minister.

Mr Chairman, I request to continue...

Datuk Jumat bin Haji IdrisUMNO · BNSepanggar

Mohon mencelah.

Yes, the Honourable Member for Sepanggar.

Datuk Jumat bin Haji IdrisUMNO · BNSepanggarEN

Thank you, Honourable Deputy Minister, and thank you, Mr Chairman. The Government has agreed to implement the Pan Borneo Highway valued at RM27 billion, but does the Government not see the very severe congestion problem in the Sepanggar area and also in Kota Kinabalu? Last year I still remember the Honourable Minister of the Public Works Department (JKR) stating that the KK Outer Ring Road would be implemented in 2015. However, it does not appear at all in the 2015 plan. So, has the Government or JKR gone blind, not seeing the need to solve the traffic congestion problem within the city of Kota Kinabalu? Thank you.

Although the Honourable Member has raised an issue that is not under our item, allow me also, Mr Chairman, to inform the Honourable Member. Among the projects to be implemented to help reduce congestion at the same time, apart from the one mentioned for Sandakan, the Triple Beam Bypass, the Ministry has also approved the project to build and upgrade the Kota Kinabalu Cross-City Road, which involves the construction of two grade-separated interchanges and the upgrading of six roads to six two-way lanes spanning 6.3 kilometres. For the Honourable Member's information, the price negotiation has been endorsed and is now awaiting approval to finalise the price from the Ministry of Finance.

Datuk Jumat bin Haji IdrisUMNO · BNSepanggarEN

The Honourable Deputy Minister.

Further answers will...

Datuk Jumat bin Haji IdrisUMNO · BNSepanggarEN

Honourable Member, that is a different route, that Cross-City Road, that is different from Kota Kinabalu, that is outside. This KK Outer Ring Road covers the coastal route area which needs to be expedited because this is a protocol road and so on. This Cross-City Road is a route to residential areas and also the Penampang area. I know this because a company has made a proposal, so JKR- please answer on the alignment of this KK Outer Ring Road, when it will be implemented.

Honourable Member, Honourable Member.

Datuk Jumat bin Haji IdrisUMNO · BNSepanggarEN

The Minister promised last year in the winding-up.

Okay, allow me also to give the Honourable Member a written reply because the Honourable Member did not debate yesterday. This is a rather short notice. Allow me to answer the Honourable Member in writing. Mr Chairman,

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Mr Chairman, may I have the floor.

Honourable Members from Sekijang, Jerantut- is the Honourable Member from KK, batu bersurat, related?

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Yes, I just request a little explanation. This is about the flyovers on the road in Kota Kinabalu. Earlier we said there would be two flyovers built in Kota Kinabalu. I understand both of these flyovers will be built this year or in the future. However, I do not see in the budget where there is an allocation, with permission. So, I request an explanation: when will these flyovers be built? That is all, thank you to Mr Chairman.

Thank you, Member of Parliament from Kota Kinabalu. Honourable Member, as I said earlier, the price negotiation has been endorsed at the level of the Procurement Board in the Ministry and it is now awaiting finalisation of the price from the Ministry of Finance. Mr Chairman, the Honourable Members from Sekijang, Jerantut and Bintulu have raised the matter of the unsatisfactory quality of road surfacing by the concessionaires. For the information of the Honourable Members, the quality of road surfacing must comply with the standards and specifications set by the JKR Road Technical Directives that have been drafted and adapted to international standards such as British Standard or BS. In addition, JKR also carries out quality audits on the surfacing works carried out by the concession companies. If there is any non-compliance, JKR will issue a warning in the form of an NCR, namely Non Compliance Report, including deduction of payment. To ensure road quality remains at a high level, much maintenance work is carried out using better technology. Repair work does not only use ordinary surfacing methods, but now much repair work uses better technology such as Cold in-Place Recycling, with permission, or CIPR, and uses better mixture materials such as Stone Mastic Asphalt (SMA), Porous Mastic Asphalt or PMA, with permission.

Mr Chairman, I wish to...

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Honourable Deputy Minister, Honourable Deputy Minister.

...To answer the questions raised by the Honourable Member, allow me to finish first, Honourable Member.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

A little on the quality of roads mentioned by the Honourable Deputy Minister. Just a little, Mr Chairman. I am rather impressed with the quality standards mentioned by the Honourable Deputy Minister and the regulations and also the fines imposed, but what was raised by my fellow Honourable Members is the reality on those roads. The quality is not there. Is it only of quality for a week after it is built and while it is audited, and after that it becomes damaged? This happens on almost all roads. If we compare with the beautiful roads abroad, I feel as if we do not have a real standard measure. So how do we reconcile between the standards mentioned by the Honourable Deputy Minister and what actually happens on those roads? Is there collusion somewhere, or what?

To answer the question raised by the Honourable Member, the Ministry is actually very serious about this matter, and that is why in this regard we do not compromise in giving warnings to the concessionaires, especially on NCRs or non-compliance reports. We implement the process of payment deduction, Honourable Member, if the concessionaire does not meet the standards that have been set. So action is indeed taken, and continuously we engage or we inform the concessionaires to look at the quality of maintenance carried out. This involves not only our junior officers but also up to our top management, including the Honourable Minister who often goes down to the ground to ensure this is implemented. Mr Chairman, Honourable Member...

Honourable Deputy Minister, may I request a moment.

...From the Honourable Members for Lipis and the Honourable Member for Tenom.

Honourable Deputy Minister, may I request...

Forgive me, Honourable Member. Allow me just a moment to finish first. The Honourable Members from Lipis and the Honourable Member for Tenom have raised the issue of slope maintenance on the main roads in their respective areas. For information, the roads involved have been recorded and will be investigated by the JKR Slope Engineering Branch. Over to my friend, the Honourable Member for Penampang.

Thank you, Honourable Deputy Minister, Mr Chairman. May I request that the Honourable Deputy Minister's officers examine the size of the drains or road drains being built on the new road between Penampang and Kinarut; the drain size is rather small and dangerous if flooding happens again. Moreover, the culverts being built at Dambai Bridge, Penampang and also at Kg. Limbanak. The culverts are rather small and there is a possibility that when the water rises, flooding may occur again. Thank you.

Thank you, Honourable Member for Penampang, for the information. I will ask JKR Sabah to look into this situation and then provide a report to the Ministry. Thank you, Honourable Member.

Datuk Raime UnggiUMNO · BNTenom

[Bangun]

To my friend the Honourable Member for Labuan, I have received information on all three projects that were raised, namely Jalan Taman Pearl, Jalan Kekinabena and Jalan Nagalang. Honourable Member, these three roads that were applied for did not pass for implementation in the fourth rolling plan of the Tenth Malaysia Plan. Nevertheless, the Ministry will reapply for these projects to be included in the Eleventh Malaysia Plan, for the information of the Honourable Member for Labuan.

Datuk Raime UnggiUMNO · BNTenom

Tuan Pengerusi.

Tuan Pengerusi...

Datuk Raime UnggiUMNO · BNTenomEN

The Honourable Deputy Minister.

The Honourable Member from Ampang, after that the Honourable Member for Tenom.

Thank you, Mr Chairman, and thank you, Honourable Deputy Minister. I just want to raise the issue of slope development brought up earlier by the Honourable Member for Penampang.

Several times in this House I have requested that JKR establish a slope development division, because slope development has become an important development, especially in my area, the Ampang Parliamentary constituency, particularly in the Bukit Antarabangsa State Constituency. So, where there was the landslide tragedy in 2008. I think the time has come for the Ministry of Works (Kementerian Kerja Raya, KKR) to form a slope development division so that it can be monitored more closely and become a one-stop centre, because at present, if there is a disaster at slope locations, many agencies are blamed. IKRAM lah, SYABAS lah and so on. So the time has come, if with the formation of this division specifically, we can increase land value, the value of land and development in these slope areas, as has been done in Hong Kong and other countries with many slopes whose development is very advanced and very valuable, and this brings income to the country. So I request that in the upcoming plan, KKR consider this matter. Thank you.

Thank you, Honourable Member for Ampang, for the question raised. The Honourable Member for Penampang earlier brought up a different issue. The issue the Honourable Member raised is for the Honourable Member for Lipis and the Honourable Member for Tenom, Honourable Member. In fact, we already have a Slope Engineering Branch in JKR. So that helps to answer the questions and all reports.

May I say a little. I understand there is a branch, but I request that it be upgraded to a division because when a branch's scope of work is not extensive, its scope of work is small. So we want the Ministry to play a bigger role in overall development on the hill slopes or development on slopes.

Thank you to the Honourable Member. InshaaAllah, the Honourable Member's proposal will be considered.

Datuk Raime UnggiUMNO · BNTenom

Tenom.

The Honourable Member for Tenom.

Datuk Raime UnggiUMNO · BNTenomEN

Thank you, Mr Chairman. Regarding this slope repair, Honourable Deputy Minister, I think the Honourable Deputy Minister's answer that a study is needed is not suitable. If possible, I request that the Ministry take action immediately because we have already reported it in this august House. There is no need to make a study, because the problem we have raised, especially when I debated at the committee stage yesterday, stated that there are slopes on the main roads, these federal roads. I think in the district these details already exist, this problem already exists, there are already working papers as well. What remains is for us to request JKR and the Ministry to give priority to repairs, moreover, Honourable Deputy Minister, the road I mentioned earlier has been there for a long time and its concession was implemented by, if I am not mistaken, yesterday I mentioned two companies, namely Globinaco and Lintasan Resources. They are responsible for repairing the condition of the road, whether road collapses or slopes. So I think, Honourable Deputy Minister, I request that this action be taken immediately. This problem has actually been around for years. When we raise this problem in district development meetings, we get the same answer as today. So I request that the Ministry give attention to federal roads, especially in my area, so that they can be given attention. This problem is our problem and this road is a main road. Thank you, Mr Chairman.

Thank you, Honourable Member for Tenom. I understand the situation that has occurred very well, Honourable Member. InshaaAllah, not only will we investigate this matter, but we will also take action immediately, Honourable Member. That is our commitment. Mr Chairman, the Honourable Members from Lenggong, the Honourable Member for Jerantut, the Honourable Member for Gerik and the Honourable Member for Parit have raised the issue of specific roads, including bridges that were damaged by the flood disaster.

For the information of the Honourable Members, JKR will carry out an inspection audit of the affected road routes. However, JKR headquarters has set up a Disaster Management Centre related to road infrastructure that was damaged by floods. Therefore, follow-up action will be taken based on the records obtained through that system. The Honourable Member from Sekijang, the Honourable Member for Gerik and my friend the Honourable Member from Kuala Kangsar also raised this issue, proposing that rubber material be used to build roads. The Government is indeed aware of environmentally friendly technology in road construction, such as the use of natural rubber in the road construction industry. This technology has been widely used in foreign countries such as Thailand. For the information of the Honourable Member, in fact rubber technology as an asphalt mixture for building roads has already been implemented in this country, namely on the 50-kilometre KLIA Perimeter Road. Therefore, it is not a new matter in road construction in this country, where it is subject to the suitability of a project. Mr Chairman...

Mr ChairmanEN

Honourable Deputy Minister, you may continue later.

Dato' Fauzi bin Abdul RahmanPKR · PRIndera MahkotaEN

Mr Chairman, Indera Mahkota. I want to take this opportunity because in the previous session I raised the problem of the road connecting Indera Mahkota to LPT, and I requested the Honourable Minister to come and see it. I want to put in record, after the Honourable Minister came, I thought that road had been resolved. I want to put on record my thousands of thanks to the Ministry.

Mr ChairmanEN

Thank you. Continue later with arguments in the middle of the day. Honourable Members, the House resumes sitting as Majlis Mesyuarat. [Majlis Mesyuarat resumed] [Mr Speaker presided over the Mesyuarat]

Mr SpeakerEN

Honourable Members, this sitting is adjourned until 2.30 p.m. this afternoon.

[The sitting was suspended at 1.02 p.m.]

[The sitting resumed at 2.30 p.m.]

Mr SpeakerEN

[The House sat in Committee] [Deputy Speaker (Dato' Haji Ismail bin Haji Mohamed Said) presided over the Committee]

Mr Chairman (Dato' Haji Ismail bin Haji Mohamed Said)EN

Yes, please, Honourable Deputy Minister. Can it be within half an hour?

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

InshaaAllah, if there is no interruption, less than that, Honourable Member.

Mr Chairman (Dato' Haji Ismail bin Haji Mohamed Said)EN

Yes, please. We have two more ministries to settle today.

Thank you, Honourable Member, Mr Chairman.

The Honourable Member for Bayan Baru and Petaling Jaya Selatan wishes to know the list of highways involved in toll compensation in 2015. For the information of the House, there are 20 highways expected to be involved in the postponement of toll rate increases next year. The list of these highways is as follows: (i) Ampang-Kuala Lumpur Elevated Highway (AKLEH); (ii) Kuala Lumpur West Traffic Dispersal Highway (SPRINT); (iii) New Pantai Expressway (NPE); (iv) Kajang Ring Road Traffic Dispersal Highway (SILK); (v) Stormwater Management and Road Tunnel (SMART); (vi) South Klang Valley Expressway (SKVE); (vii) Sungai Besi Highway (Besraya); (viii) Senai-Desaru Expressway (SDE); (ix) Butterworth Outer Ring Road (BORR); (x) Guthrie Corridor Expressway (GCE); (xi) Kajang-Seremban Highway (LEKAS); (xii) Duta-Ulu Kelang Expressway (DUKE); (xiii) Kuala Lumpur-Putrajaya Expressway (MEX); (xiv) Damansara-Puchong Expressway (LDP); (xv) North Klang Straits Bypass (NNKSB); (xvi) East Coast Expressway 1 (LPT1); (xvii) Kuala Lumpur-Karak Expressway (KLK); (xviii) Cheras-Kajang Expressway (Grand Saga); (xix) Kuala Lumpur-Kuala Selangor Expressway (LATAR); and (xx) Kemuning-Shah Alam Expressway (LKSA). Of the 20 highways, a total of 17 highways will receive toll compensation in 2015, while the remaining three highways will receive compensation in 2016. The estimated compensation involved for 2015 for the 17 highways is RM558.69 million. The allocation approved for the Ministry of Works for the purpose of compensation payments is RM458 million. Additional allocation for this toll compensation will be applied for in mid-2015. To answer the Honourable Member for Sepang, the allocation for the toll compensation payments has been provided through government allocations under the Ministry of Works. These compensation payments are made based on the compensation calculation formula that has been determined in each respective concession agreement. The actual amount of toll compensation payments will be determined after the traffic verification process carried out by the Malaysian Highway Authority (LLM). With regard to the issue raised by the Honourable Member for Kulai and Sepang, namely that all highway concession agreements be disclosed to the public, for the information of the Honourable Member, under the law, the concept of agreements involves the aspect of confidentiality where the consent of both parties is required before an agreement can be disclosed. Some of the highway concession agreements in question can in fact be accessed at the Ministry of Works Library subject to certain conditions. Honourable Members who are interested in viewing the concession agreements may refer to the Ministry of Works for further action. Mr Chairman, the Honourable Member for Jerlun and Sepang...

Mr Chairman (Dato' Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Beruas rises.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Thank you, Mr Chairman. Because the public does not know about the agreements signed between the government and the highway operators, we sometimes wonder what the government's policy is. Take for example the state of Perak, where the North-South Expressway has two interchanges that are very close to each other, only five kilometres apart, namely the interchange entering Bandar Baru Parit Buntar, and recently the highway operator will build another interchange near Alor Pongsu, which is also only five kilometres from the other. However, in the state of Perak, the residents of Kampar have for a long time requested that an interchange be built for Bandar Kampar, which has a university, namely UTAR, and the nearest interchange is dozens of kilometres away.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

So sometimes we wonder. If possible, please give an explanation. Is it policy, or has the government determined how many kilometres apart each location must be, or as long as there are towns, these highway authorities and operators must build an interchange, with permission? Can we get an explanation?

Okay, Honourable Member, earlier I touched on the matter of concession agreements, yes. The Honourable Member has raised a case that is rather specific. So I need notice in order to answer in writing or later, if there is an opportunity.

Mr Chairman (Dato' Haji Ismail bin Haji Mohamed Said)EN

Yes, this is a new matter, in writing is fine.

Yes, me. Thank you, Mr Chairman. The Honourable Member for Jerlun and Sepang has raised the issue relating to concession agreements and the improvement aspects involved. For the information of the House, the construction of highways through private sector initiatives will in fact allow more highway infrastructure to be built in a shorter period of time without involving government allocations. This means that government development allocations can be used to build more social facilities and other public infrastructure. The rationale for privatising tolled highways is to provide alternative facilities to users based on the concept of user principal, with permission, where users will benefit from the services paid for, for more comfortable and safer journeys. For the information of the Honourable Member, the principle of privatising tolled highways in this country is closely linked to the distribution of risk to be borne by the government and also by the concession bidder. Accordingly, to ensure that the interests of the government and the public are always protected, the government has improved the clauses in the latest highway concession agreements. For example, toll rate increases are no longer made automatically, but are subject to government approval, where toll rate increases must go through a specific screening process such as an audit of income or revenue and actual traffic volume compared to projections.

Puan Teo Nie ChingDAP · PHKulai

[Bangun]

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Kulai rises. May I?... Yes, please.

Puan Teo Nie ChingDAP · PHKulaiEN

Thank you, Mr Chairman. Honourable Deputy Minister, my question is about the concession agreements. Earlier the Honourable Deputy Minister mentioned that if we want to disclose these concession agreements, we must obtain permission from both parties. So, I would like to ask about the agreement for the EDL Highway, is the Honourable Deputy Minister saying that the concession company, namely MRCB, they do not, they refuse to disclose the agreement between MRCB and also the government. If not, why is there any difficulty for the government in disclosing the agreement for EDL? That is my first question. The second question concerns the concession agreements placed in the Ministry of Works Library. I think if they can already be placed there, the public can also go to the library to refer to the agreements. Can we do one more stage? Can we upload these agreements onto a website so that the public do not need to go to the Ministry of Works Library. They can also access the agreements at home.

Thank you, Honourable Member for Kulai. Regarding the matter raised by the Honourable Member for Kulai, in this matter, we cannot use a general statement, with permission, to state anything about an agreement or concession that involves a specific concession, Honourable Member. I am not saying that this is EDL or that the government has certain reasons why this agreement is not disclosed and so on.

Some concession companies choose to disclose their terms and conditions, and as I mentioned earlier, these can be obtained at the Ministry of Works Library itself. The public, meaning the public can obtain access, Honourable Member. We do not prevent it, in fact if the Honourable Member and other colleagues wish to go to the ministry, we welcome you, Honourable Member. There is no problem and there are no matters that we want to hide from the Honourable Member. If I may touch on it once more, there is an agreement between both parties, Honourable Member. This concerns confidentiality, which is the legal right of the concession party and also the government party. So for these terms to be disclosed, the consent of both parties is required for us to go through this process, Honourable Member. As for the second question earlier, Honourable Member, if I may ask the Honourable Member to state it once more, the second one.

Puan Teo Nie ChingDAP · PHKulaiEN

Earlier the Honourable Deputy Minister mentioned that there are several concession agreements placed in the library. I have only one suggestion. I suggest that they be uploaded to the internet, to a website, so that like residents in Johor, in KK, Sabah and Sarawak, they do not need to come to KL to refer to the concession agreements. They can simply use that website because I think the present government also wants to make our bureaucracy more efficient, does it not?

Okay, thank you. Up to now this information can be obtained at the ministry level. We are not planning it yet, Honourable Member, yes. Again I mention this to respect the legal rights of the concession party. Thank you, Mr Chairman. I will continue with the answer, namely that in addition, several new clauses have also been included in the latest concession agreements, such as the stipulation of level of service and exit clause. The level of service clause stipulates that the level of highway service must be enhanced in line with the increase in traffic volume. This includes the addition of the number of highway lanes when traffic has reached a certain capacity level as stated in the concession agreement. As for the exit clause, it stipulates that the highway concession period will be terminated earlier than the actual period if the concession company has achieved an internal rate of return (IRR), with permission, earlier, in other words, early termination, with permission. Mr Chairman, the Honourable Member for Kulai has raised the issue of the imposition or application of tolls on the Eastern Dispersal Link (EDL) Johor Bahru. The government certainly takes this matter very seriously, Honourable Member, regarding the costs borne by the people of Johor Bahru who commute to Singapore and vice versa. Accordingly, the government is studying other options, with permission, that may be considered to reduce the burden borne by the users concerned. This includes proposals to improve public transport aspects at Johor Causeway. A detailed study on this matter is being carried out by the Ministry of Transport. Mr Chairman, regarding toll rates and their relation to highway construction costs. For the information of the Honourable Member for Kulai, in general the determination of toll rates is made based on factors including construction costs, operation and maintenance costs, loan repayments, concession period, expected traffic flow and internal rate of return (IRR). For the information of the Honourable Member, on average most concession companies spend 90 per cent of toll collections on operations, maintenance and loan repayments...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Jasin rises.

Allow me to finish, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Datuk Rosnah binti Haji Abd. Rashid ShirlinUMNO · BNDeputy Minister of Works · PaparEN

Meanwhile, only about 10 per cent of the toll revenue obtained by the concession company will be distributed to shareholders as returns on their investment. Please, the Honourable Member for Jasin.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Thank you, Mr Chairman, thank you, Honourable Minister. Earlier the Honourable Minister mentioned, raised the matter of serious traffic flow. So, Melaka, as an outstanding tourist state, faces a very serious traffic congestion problem, especially on weekends and during festive days. Melaka has already submitted a proposal to the ministry for an inner ring road to be established. Not only can we solve the congestion problem, but this inner ring road can also accommodate any volume of traffic. At the same time it will give tourists the opportunity to continue seeing the beauty of the state of Melaka. So I want to see, I want to hear from the Honourable Minister, to what extent the proposal that has been made by this state government has been considered by the ministry? Thank you, Honourable Minister.

Thank you, Honourable Member for Jasin. Again this is a new matter. Allow me to answer in writing.

Dato’ Othman bin AzizUMNO · BNJerlunEN

The Honourable Minister...

Mr Chairman, the Honourable Member for Jerlun...

Dato’ Othman bin AzizUMNO · BNJerlunEN

Jerlun, a brief interjection. Yesterday I raised the matter of the RM458 million toll compensation. I asked that the highways involved and also the focus traffic be stated. I also proposed that the highway users involved should be informed. For example, users of the highway, say AKLEH, have been subsidised by the government two sen per kilometre, for example, because they enjoy compensation payments. Because today, as we are all aware, when we want to build highways, people do not complain, people are happy, people clap hands, proud, happy and so on. But when toll rates are revised, everyone complains, especially the opposition. So I ask that the LLM and the concession company may write on the back of that receipt, "You have been subsidised two or three sen per kilometre for using this highway through compensation payments by the Federal Government". Thank you.

Thank you, Honourable Member for Jerlun, for the proposal. For the information of the Honourable Member for Jerlun, earlier I announced the highways, 20 in total. I will also provide the Honourable Member with a written answer regarding traffic focus and subsequently the costs. The Honourable Member has made a very good proposal. It will be considered, the LLM is in support. InshaAllah we will consider the proposal properly.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Honourable Minister, just a moment, only a brief clarification from the Honourable Minister.

Dato’ Ngeh Koo HamDAP · PHBeruas

[Bangun]

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, two are standing. Which one? The Honourable Member for Bayan Baru?

Dato’ Ngeh Koo HamDAP · PHBeruas

Beruas.

The Honourable Member for Bayan Baru, followed by the Honourable Member for Beruas, yes. Okay.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Mr Chairman, thank you, Honourable Minister. I was interested in the proposal from the Honourable Member for Jerlun that it should be written to thank the government for subsidising the toll.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

But the problem is that the government is using money from the federal road maintenance fund to subsidise tolls.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Okay, this is a very big problem. Why do I say that? Because in the 2014 Budget, RM1.07 billion was allocated for the maintenance of federal roads in Sabah, Sarawak, Labuan and also Peninsular Malaysia. Total RM1.07 billion. But next year the federal road maintenance fund has dropped by 43 per cent, which is equivalent to RM459 million. Where did that RM459 million go? It went to toll compensation payments, namely RM458 million, roughly RM459 million. So, we are using money from the federal road maintenance fund for toll compensation. So, I am surprised, if we want to subsidise tolls, but in reality the federal roads will become terrible. Potholes, puddles, maintenance, everything cannot function because there is less money, down RM459 million, which goes to the concession companies. These concession companies are all companies that seek profit.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Member for Bayan Baru, this is an interjection, not a speech.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

I ask that if the ministry wants to pay toll compensation, it should take it from elsewhere, ask from the Ministry of Finance. Do not use the Federal Road Maintenance Fund. I ask, if possible, that the Honourable Deputy Minister explain. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The question is simple, is it true that money from the federal road maintenance fund is used for toll compensation? That is all. It will not take even half a minute.

That is not true, Honourable Member. Actually that is not the case...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

I hope the Honourable Deputy Minister will conclude by 3 o'clock.

InshaAllah, Honourable Member. However, I want to explain. But first I want to thank the Honourable Member for Bayan Baru for understanding this issue. This is what I want to say, that our government listens to the pulse of the people. That is why when the issue of toll increases was trumpeted and politicised by some of the Honourable Member's colleagues, the thinking of our people was clearly swayed by this issue. If the Honourable Member can play a role in helping us at the government level to explain that when we have to pay compensation, of course this will involve a large amount. However, this is done by the government because it understands the issue on the ground, where there are some of our people who cannot afford or feel burdened by the increase in toll prices. So, if this issue can be explained well, I am confident and believe the government will also take the best action for the welfare of the people. InshaAllah.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

The Honourable Deputy Minister...

Dato’ Ngeh Koo HamDAP · PHBeruas

[Bangun]

Puan Teo Nie ChingDAP · PHKulai

[Bangun]

I have several issues that need to be clarified and I only have seven minutes.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Just one statement, 30 seconds. Thank you, Mr Chairman. Earlier the Honourable Member for Jerlun proposed that it be recorded on the toll receipt that the people must thank the government for paying compensation to the highway operators. In fact, in my view, a more accurate point is that the government must apologise to the people for using the people's money to pay compensation to the highway operators because of the lopsided agreements that were signed by the government.

I think the government does not need to apologise because the money saved will return to the people, Honourable Member. The one who should apologise is the Honourable Member for misrepresenting the statements and misrepresenting the situation. I think the most appropriate apology is from the Honourable Member himself. So Mr Chairman, I want...

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Mr Chairman, a little more...

...Continue, because I do not have time and many of our colleagues here are waiting for an answer from me myself.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Just a little, I want to give a small suggestion.

I would like to ask Mr Chairman, if possible?

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Mr Chairman, Bagan Serai. Just 30 seconds.

There are still several issues.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

There is no need for clarification.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Thank you Mr Chairman, thank you Deputy Minister. This is about traffic congestion, especially at toll plazas. I see that at the toll highways that everyone uses, when we open two lanes, three lanes or four lanes, the number of cars increases, the congestion also increases, and sometimes it even causes accidents. One suggestion I would like to give to the government is that everyone be required to use SmartTAG, because no matter what, whoever is on the toll must pay. Movement will become slow and sometimes accidents happen. So, using SmartTAG is a wiser and better way so that work runs more smoothly. This is one suggestion, thank you.

Thank you, Honourable Member. This matter has indeed been implemented on several highways or several of our toll plazas. Thank you, Honourable Member, for the suggestion put forward. I shall continue with this announcement. For the information of the Honourable Member for Kulai, the issue of objections to the toll determination of the EDL Highway has been brought to court by way of a writ of summons at the High Court of Johor Bahru, number 21 CVC 2408/2014. Therefore I shall not elaborate further on this matter. The Honourable Member for Kulai also raised the matter of the status of the construction of the Seri Kembangan interchange to the MEX Highway. For the Honourable Member's knowledge, the interchange will benefit residents in the Sri Kembangan area and surrounding areas, where it will help the smooth flow of traffic in the area, particularly at Jalan Putra Permai B16. Accordingly, the traffic congestion problem in the Seri Kembangan area is expected to decrease when the project to build the new interchange connecting the area to the MEX Highway is completed at the end of 2015. The Honourable Member for Petaling Jaya Selatan raised the matter of the status of the 12-month period for the concession company KIDEX Sdn. Bhd. to fulfil the conditions precedent, which ended on 14 November 2014. For the Honourable Member's information, the government has approved an extension of three more months to the concession company to fulfil the conditions precedent, with permission, namely until 14 February 2014. The extension of the period to fulfil these conditions precedent is made in accordance with the provisions of the KIDEX concession agreement.

The Honourable Member from Petaling Jaya Selatan also raised the issue of the alleged conflict of interest of Yang Berbahagia Tan Sri Harinarayan Govindaswamy as a Board Member of the Malaysian Highway Authority (LLM) and also a Board Member of the company KIDEX Sdn. Bhd. For the Honourable Member's information, Yang Berbahagia Tan Sri Harinarayan Govindaswamy was a Board Member of the Malaysian Highway Authority from 1997 to 2008. Meanwhile, the concession agreement for the KIDEX Highway was signed on 15 November 2013. For the Honourable Member's information as well, the approval of the KIDEX Highway project was deliberated through a Public-Private Partnership Committee meeting at the Public-Private Partnership Unit, Prime Minister's Department, and not at this ministry or the Malaysian Highway Authority. The Honourable Member from Tanjong raised the issue of the status of the Penang Outer Ring Road (PORR) project, which has been postponed since 2007. For the Honourable Member's information, this project will not be implemented through privatisation. Mr Chairman, the Honourable Member from Bayan Baru...

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Honourable Deputy Minister, regarding that KIDEX matter.

Mr Chairman, with permission?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Ringkas sahaja.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Just briefly. I would like to ask the Honourable Minister: if within these three months KIDEX still cannot submit their report and also cannot hold a Public Hearing, that is, Pendengaran Awam. That means, generally, all the residents of Petaling Jaya object to this KIDEX project. If based on the outcome of the Public Hearing no, will the government grant permission to approve this KIDEX? Thank you.

Thank you, Honourable Member for Petaling Jaya Selatan, for raising this question and also raising the additional question. For the Honourable Member's information, it is true that the public hearing has not yet been carried out by the MBPJ, that is, the Petaling Jaya City Council (Majlis Bandaraya Petaling Jaya). At the same time, the MBPJ, Honourable Member, has appointed Tetuan MDS Consultant to evaluate the traffic study that was carried out by KIDEX's traffic consultant. Accordingly, the three-month extension is actually justified, Honourable Member, taking into account the ongoing engagement, with permission, that is being carried out by KIDEX. At the same time, I would like to inform the Honourable Member that the Say No To KIDEX group held a meeting with the Honourable Minister of Works on 3 July last. Based on that meeting, the group has or needs to submit their report regarding their objection to the construction of the KIDEX Highway. The Honourable Member said everything, so we cannot take that word at face value. So we ask this group to do and make their report on their objection regarding the construction of KIDEX itself. For the Honourable Member's information, on 3 November 2014, the group informed us that the report had only just been completed and was ready to discuss with the ministry and the Malaysian Highway Authority. Therefore, the ministry feels that the three-month extension is necessary for us to examine the relevant reports, Honourable Member. Apart from that, Honourable Member, I would also like to inform you that although the public hearing has not been held, engagement with bodies including residents' associations has been carried out extensively. Allow me to give examples such as the Residence Association Melur, Mawar, Gugusan Dedap, Matahari in Taman Kelana Indah, in the flats. A lot of engagement has been carried out to explain KIDEX itself. Don't say we did not engage, and this engagement has been carried out continuously from August until November.

Explanations have also been given to the Human Rights Commission of Malaysia (SUHAKAM) on 21 July and 28 October, as well as to companies operating along the route, including Access REIT, CIMB, Digital Mall, Natural Wellness, Dutch Lady, British American Tobacco and many more, Honourable Member. If I were to mention them all here, we may not have much time. Apart from that, Honourable Member, I think, considering that this is what has become the right of the highway, that is, this extension of period, we are waiting, and I have already explained the justification for why we need to give this period to them. Mr Chairman, I seek permission to continue. Mr Chairman, the Honourable Member from Bayan Baru requested statistics on accidents at construction sites recorded by CIDB. For the Honourable Member's information, accidents at construction sites fall under the jurisdiction of the Department of Occupational Safety and Health (DOSH), Ministry of Human Resources. However, based on CIDB records, there were 60 accident incidents at construction sites recorded for the period between October 2012 and October 2014. Of the 60 accident incidents, the total number of deaths was 42 persons, of whom 28 were foreign workers and the rest were local workers. To improve the level of safety and health at construction sites, the ministry has amended Act 520, the Construction Industry Development Board (CIDB) Act, to increase the obligations and responsibilities of contractors, whether during or after construction. The registration of construction personnel, which requires them to possess a valid green card, is also being enforced. Various courses and training on safety have also been organised to increase awareness, understanding and knowledge, not only among construction workers but also employers. Construction projects are also encouraged to undergo safety assessment through the Safety & Health Assessment System in Construction, or, with permission, SHASSIC. Apart from that, Mr Chairman, the ministry has also set up an expert committee chaired by the Chief Executive of CIDB to study improvements in the construction industry. For the information of the Honourable Members, the recommendations of this expert committee, or expert panel, have been approved by the Cabinet. At present, action is being taken in stages, including drafting related acts, such as the CIDB Act, the Occupational Safety Act and so on, as part of our efforts to improve safety aspects.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Deputy Minister.

Mr Chairman, the Honourable Member from Bayan Baru also asked for an explanation on the issue of the decline. Not much more, Mr Chairman, only two pages left. The decline in the number of local contractors involved in the implementation of projects overseas. For the Honourable Member's information, in 2013, 9 contractors handled contracts overseas valued at USD624 million. As of October 2014, only 3 contractors handled six projects valued at USD76 million. The reduction in this number is due to local contractors being more interested in participating in projects within the country, which have increased rapidly through the implementation of various projects under economic programmes, such as the Economic Transformation Programme (ETP), Public-Private Partnership (PPP) and the Regional Economic Corridor Development. The Honourable Member from Limbang raised the matter of the new JKR training centre. For the Honourable Member's information, the JKR training centre is still at the construction stage. Work is in progress at the site to the extent of 12 per cent. For the Honourable Member's information, this project can accommodate 650 course participants at any one time, and 450 dormitory rooms are provided for officers attending courses. This centre will be completed on 29 August 2016 and can accommodate all technical participants throughout Malaysia.

The Honourable Member from Setiu raised the issue of the safety of school corridor design following accident cases involving students, particularly primary school pupils. For the Honourable Member's information, the JKR has designed school corridors with handrails at a height of 1,200 millimetres compared with 900 millimetres as required by the Uniform Building By-Laws (UBBL). This case is isolated and rarely occurs. The Honourable Member from Sungai Petani raised the issue regarding the maintenance of teachers' quarters. For the Honourable Member's information, all teachers' quarters fall under the jurisdiction of the Ministry of Education. The ministry will channel allocations to the Public Works Department (JKR) for maintenance work and for work carried out by the Ministry of Education. The JKR carries out the work based on work orders from that ministry.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Honourable Deputy Minister.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

That's enough, Honourable Member for Bayan Baru.

Menguji- sorry, we can have coffee after this, Honourable Member. I will try to answer the questions raised. The professional architect examination tests the level of readiness. This is to answer the issue raised by the Honourable Member for Parit regarding senior architects at the JKR who have not received recognition as professional architects. For the information of the Honourable Member for Parit, the professional architect examination tests the level of readiness of an architect in carrying out his duties. This is because, upon passing the examination, he is eligible to register as a professional architect and thereby has the authority to verify the level of integrity in terms of the safety and health of buildings constructed in Malaysia. This is for the protection of the public interest. Accordingly, all architects, including those at the JKR, must comply with the above conditions, because registration with the Board of Architects Malaysia does not look at how long or where they have served as a condition for becoming a professional architect.

Mr Chairman, that is all the explanations I can give on the issues raised during the debate. Once again I thank all the Honourable Members who have submitted questions and raised issues relating to the Ministry of Works. This ministry will take note of and act upon the matters that have been raised. Any questions not answered in time will be noted and followed up. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Thank you, Minister. Now the Minister and the Honourable Minister smile, and the Honourable Member for Tenggara also smiles cheerfully today. All right, Honourable Member, the question is that the sum of RM2,112,630,000 for Head B.27 under the Ministry of Works forming part of the Schedule be agreed to. [The question was put and agreed to] [The sum of RM2,112,630,000 for Head B.27 was ordered to form part of the Schedule]

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The question is that the expenditure of RM3,838,177,500 for Head P.27 stated in the Development Estimates for 2015 be approved. [The question was put and agreed to] [The sum of RM3,838,177,500 for Head P.27 was approved as part of the Development Estimates 2015]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 Committee — Head B.60 [Schedule] - Head P.60 [Development Estimates 2015] -Bill

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Ministry of Defence. Supply Head B.60 and Development Head P.60 under the Ministry of Defence are open for debate. Yes, Honourable Member for Pokok Sena- 10 minutes, yes, Honourable Member for Pokok Sena.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Yes. Thank you, Honourable Minister. I wish to touch on B.60, firstly Item 010000 - Defence Administration. I would like an explanation from the government regarding the position of the Chief of Defence Force (Panglima Angkatan Tentera) who has already reached the age of 60, but I understand he has been extended and continued his duties for a period of two years. So what special qualities does he have that led the government to agree to extend his service by another two years? Because if I look at what happened in the operation at Lahad Datu, I do not see where his special qualities and brilliance as Chief of Defence Force lie, where in facing intruders numbering about 200 people we deployed our battalions with armoured cars, tanks and so on, yet it did not show any ability and efficiency on his part as someone at the top in arranging and organising a good strategy for the security and defence of our country. So I want to get an explanation of what special qualities, advantages and brilliance he has that led the government to extend him for another two years? Then I also want an explanation of the cost of renovating the official residence of the Chief of Defence Force at Jalan Belami behind the Palace, and what the total amount is. Although it is an official residence, whoever becomes the commander will live there, but what is the need to renovate it to such a large extent, and I also want to know the actual cost of the renovation? What renovation needs have already been carried out and done, and from which allocation was it used from the Ministry of Defence account? I also want an explanation of how many military personnel are on duty there, coming and going and so on? I understand it is quite a large number, which I think is not proportionate for guarding just one family, although it is important for a commander and so on, but I want a clearer explanation. Second, I wish to touch on Item 030000 - Land Defence. I want an explanation from the government about the location of the Seven Brigade Complex at Skudai Camp, Johor. I asked in the question of 8 October last, when the project would be completed? I was answered that the project had been cancelled due to the failure of the developer company to complete it. The termination of the privatisation agreement was issued on 11 April 2011. So the issue is, how much loss must we bear as a result of cancelling this project? I think I have raised this matter before, based on the report made in the PAC, in the Public Accounts Committee, on the failure of this project which took such a long time, and the agreement based on a land swap, that is, land exchange and so on. I understand that the company has mortgaged the land obtained by him from other camps, including, if I am not mistaken, Kem Majidi, which was mortgaged to Malaysia Building Society. Although initially it was not allowed, because the Ministry of Finance gave confirmation and certification that it was recognised as a financial institution, it was then mortgaged. So I want to ask for an explanation, what is the status of that mortgage? Was the mortgage fully mortgaged, and did he get money, if I am not mistaken RM400 million to RM500 million, which the company obtained from this mortgage? So what action is being taken?

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

First, what about the land? Has it been recovered by the government? How, and what actions are being taken so that we can recover all the losses we have had to bear, and what action is being taken against the company? Finally, Mr Chairman, Item 040000 - Maritime Defence, which concerns the navy. I want an explanation from the government regarding the construction of the training ships TLDM Gagah Samudera and Teguh Samudera. Gagah Samudera was already launched by the wife of the Honourable Prime Minister, on 14 December 2012. Teguh Samudera was launched by Tun Dr. Siti Hasmah on 27 February 2013 at the NGV Tech Sendirian Berhad shipyard in Sijangkang. I am informed that this training ship is 75.9 metres long, designed in cooperation between NGV Tech and Daewoo Shipbuilding and Marine Engineering from South Korea. This is the first TLDM training ship of frigate size and able to provide more effective advanced training. I am also informed that Gagah Samudera was supposed to be handed over to TLDM in May 2013 at Lumut. The original contract was worth RM296 million for both ships, and RM1,148 million for each one. It is understood that both ships have still not been handed over to TLDM. We cannot make use of those ships. I am also informed that NGV Tech is also experiencing financial problems to the point that it is unable to do so. This is why it cannot complete the ship, and it is understood that the main financier for this project, Maybank, is in the process of recovering its loans, and as a result, the ship... I am informed that Maybank wants to hold on to, to withhold, this ship because the borrower cannot pay, NGV cannot pay. So, I want an explanation of what the status of this ship is. What is the status of NGV Tech now? Is the government, that is the Ministry of Defence (MINDEF) through TLDM, in the process of issuing a new tender to another company to complete this ship? What is the total additional cost that has to be borne by the government?

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

I thank you. If I am not present during the winding-up later, I apologise because I have another matter. You may reply to me in writing, but preferably give a clearer answer, because others also want to know, as this is a very big issue. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, thank you. Honourable Bagan Serai.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Thank you, Mr Chairman. I refer to B.60. The item to be discussed is 090500 - Maintenance and Equipment for Air Space Defence, where the allocation estimated for next year is RM36.4 million, compared with no allocation given last year. Although it is one-off, in relation to several cases involving the security of the national airspace, it is given priority by the ministry. The government takes seriously the cases that have occurred involving Malaysia's airspace. Mr Chairman, the Royal Malaysian Air Force was established in 1998 as the Federation of Malaya Air Force, but its history can be traced much earlier with the establishment of the Malayan Volunteer Air Force or the Malayan Auxiliary Air Force, with permission, as a branch of the British Royal Air Force during the British colonial period. When the Federation of Malaysia was established in September 1963, the name of this force was changed to the Royal Malaysian Air Force.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Malaysia's air defence system has been severely criticised by foreign media in relation to the loss of the MAS aircraft MH370, which at that time was on a flight from Kuala Lumpur to Beijing, China, last March. Various speculations and criticisms have been made about national defence, for example, that Malaysia's radar was said to be unable to identify the location of the aircraft at that time, even though it was said to still be circling in our airspace. The mystery of this disappearance has given rise to various speculations, and several countries have extended a hand to help the country in the search and rescue mission, with permission, that has been carried out. Initially, the search mission began in the South China Sea and eventually turned back through Malaysian airspace to the Indian Ocean, and this joint effort should be commended because it shows the close friendship maintained with the countries concerned. Nevertheless, the country can no longer rely entirely on foreign countries if such cases occur in the future. I would like to request the ministry to state the existing assets and equipment for safeguarding Malaysia's airspace, and whether this equipment is maintained according to the set schedule, and to what extent this existing equipment is able to control this airspace, because technological advancement today can change everything. So overall, the efforts made by the government should be praised, because in times of such tragedy, the capability of the Government of Malaysia to generate international support for the search and rescue mission is tested. Such international support could not be obtained without the firm standing of Malaysia's diplomatic affairs. This incident also illustrates a slight weakness in defence, because the military was said to have been able to detect MH370 changing its flight heading but did not take any positive action. There is still room and opportunity to improve the security level of Malaysia's airspace, and whatever efforts have been made must be praised. Mr Chairman, thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The Honourable Lumut.

Yes, thank you, Mr Chairman. In discussing or debating the Ministry of Defence under B.60, P.60, the Ministry of Defence was allocated RM17.7 billion in 2015, compared with RM16 billion this year. In this regard, I would like to refer to item 020000, namely Services and Supplies, for which RM6.5 billion has been allocated. I hope the ministry will be able to manage this allocation well so that it can bring the operational readiness of the Malaysian Armed Forces (ATM) assets to a level of more than 90 per cent on standby. Furthermore, it can improve the security level of the national border, particularly on the East Coast of Sabah bordering the Philippines. The people no longer wish to tolerate any kidnapping incidents. Two kidnappings before this are enough. Therefore, I hope the Malaysian Armed Forces will strengthen operations to monitor the area more seriously so that terrorists do not slip in from the Philippines and intrusions can be curbed. So far, we see no visible increase in operations. Therefore, we want to know what the plans of the Malaysian Armed Forces are. Mr Chairman, returning to the allocation given, I would like to remind the ministry to control expenditure tightly, particularly in the procurement of spare parts outside contracts, which are easily manipulated in price to multiply several times over, as in the case of the procurement of magnetrons that I raised at the policy stage previously. Indeed, according to my examination, the procurement of magnetrons was not an emergency procurement, because the application was made on 26 February 2014 and supplied on 14 October 2014. This was a normal supply.

Mr Chairman, in order to control procurement prices so that they become more reasonable, I propose here that a price-checking cell be established within the spare parts procurement organisations in the logistics organisations of the Army, the Royal Malaysian Navy and the Royal Malaysian Air Force. This is because price checks are currently easily obtained through Google search, and manufacturing firms are also listed. It is easy to implement. If this is done, I am confident that excessive leakage can be reduced. Mr Chairman, in terms of asset maintenance work, I hope every asset of the Malaysian Armed Forces can be completed according to the stipulated completion date. From my experience in TLDM in the past, it has been proven that most ships undergoing maintenance constantly experience delays in completion dates. I hope the ministry can ask Bousted Naval Shipyard to improve its capabilities, and TLDM should change its maintenance policies and approach. Following on from that, the ministry is requested to report how many assets of the Army, the Royal Malaysian Navy and the Royal Malaysian Air Force experienced delays in maintenance completion dates during 2013 and 2014, and to state the reasons as well. Mr Chairman, in dealing with this maintenance activity, and also to reduce leakage and corruption, I would like to propose that the ministry provide a client room on the ground floor so as not to encourage contractors or the ministry's clients from meeting officers in their offices. This method has been practised by the Ministry of Finance itself. I congratulate the Ministry of Finance. Mr Chairman, next, in terms of training, I would like to seek an explanation from the Ministry of Defence as to why the Army had to carry out a gunnery exercise for an armoured car squadron requiring a long journey from Sungai Petani to Gemas in the month of Ramadan, when the security situation of the country today is not threatened. As a result of that long journey, an accident occurred which caused two personnel to die and two personnel to be injured. It is hoped that responsibility for this incident will be taken by the new Chief of the Armed Forces, whose service has been extended for two years, for failing to plan carefully. Mr Chairman, in terms of operations, I ask the ministry not to be too busy with the problem of the disappearance of MH370, because surely it is not in the southern Indian Ocean, but rather focus on the assets of the Malaysian Armed Forces themselves. Does the Minister not know that the operation of ATM assets is reported to be declining? If this is true, please report it to this House so that specific follow-up action can be taken by Members of the House. The House may wish to know how many TLDM ships, Air Force aircraft, Army tanks and other ATM assets are in full operation. Mr Chairman or Datuk Chairman, on the matter of these operations, I also request an explanation from the ministry as to why TLDM sailed the CB90 boat from Kota Kinabalu to Layang-Layang Island to the point of nearly sinking or being lost.

Why was this boat not transported using a carrier vessel, since it is known that the CB90, or CB90 boat, is unable to withstand rough seas and long distances? It seems TLDM has forgotten the incident of the sinking and loss of KD Sri Perak during a voyage to Labuan in 1982. Mr Chairman, on this occasion I also request that the ministry focus on improving the infrastructure of the dilapidated camps throughout the country. Please inform us of the ministry's plans in this matter. Mr Chairman, allow me here to inform the House that Operation Fajar by TLDM in the Gulf of Aden has succeeded in saving lives and national property worth billions of ringgit. Did Mr Chairman know that once, a TLDM personnel in this operation saved a kidnapping victim by personally handing over USD3 million in cash to the kidnappers or Somali pirates, and thus managed to rescue the kidnapped person? The question now is what gifts or allowances have been given by the government to them?

In this regard, I would like to recommend that they be awarded RM100,000 each in cash as a token of the government's appreciation for their sacrifice. This is because, while on duty, they were separated from their families and had to fast and celebrate Hari Raya in the Arabian Sea in the Gulf of Aden. Likewise, ATM personnel on front-line duty protecting the nation's sovereignty, such as at Layang-Layang Island, Mantanani Reef, Siput Reef, Perahu Reef, Jarak Island and Perak Island, are paid an allowance of RM100 a day. Considering the hardship, difficulties and suffering they experience while carrying out their duties, the same applies to the personnel involved in Operation East Coast Sabah. Mr Chairman, regarding human resource management, we request that the ministry give attention to other ranks so that they are not burdened with tasks piled one upon another as a result of the multiskilling method practised. Whereas their trade or expertise allowance is paid for only one trade. In this regard, I ask the ministry to look into this matter. The ministry is also requested, and it is also proposed, that the Al-Hafiz allowance for KAGAT personnel be introduced, as in other trades within the corps such as signals, electrical engineers and armour engineers and others who are paid allowances. For non-pensioned veterans, I hope a one-off payment of RM500 will be given in 2015, because they see fishermen, farmers, rubber tappers and oil palm planters receiving special treatment from the government in the form of monthly allowances. Why not them? Mr Chairman, on another matter, I would like to seek an explanation of how the Veterans Affairs Department incurred a loss of RM12 million by paying pensions to people who had died. Whereas those who receive pensions, those who were pensioned in the twentieth century, receive a different pension from those who are pensioned in the twenty-first century. In this regard, we request the ministry to make efforts to harmonise these differences. Mr Chairman, referring to Item 30000, RM3.6 billion has been allocated for payments for asset procurement projects under the Tenth Malaysia Plan that are ongoing. I ask the ministry to provide details of the payments to be made. For example, what will happen to the project for two TLDM training ships that was mentioned by the Honourable Pokok Sena, since their builder, NGV Tech, has gone bankrupt. Also the armoured car project by Deftech, worth billions of ringgit, more than RM2 billion, for 257 units. What is its status, whether it has been supplied on schedule or otherwise? Likewise with the procurement project for Super Kruger helicopters by the Royal Malaysian Air Force. What is its status? Whether all those helicopters have been supplied or otherwise? Also other projects in the procurement process, most of which are experiencing delays, unlike the corvette procurement project from Germany in 1982. It was delivered on the stipulated time because at that time the project head was led by former Navy Chief Tan Sri Abu Bakar Jamal, or Captain Bakar at that time. He was a firm person who could not be influenced by top management of the dockyard when facing problems in ship construction. He was firm and always stood with his staff in all of his staff's decisions. I hope it can be made an example for the good of the Ministry of Defence and the Government of Malaysia, as well as the people of Malaysia. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Labuan.

Datuk Rozman bin IsliUMNO · BNLabuanEN

Thank you, Mr Chairman. I would like to put forward several questions and proposals for Item 080500 – Air Defence; Item 090500 – Maintenance and Equipment for Air Space Defence; and also Item 006000 – Air Force Equipment.

Datuk Rozman bin IsliUMNO · BNLabuanEN

I thank the Ministry of Defence for deciding to return the Hawk Squadron to Labuan starting in 2015, or which has already started a few weeks ago. My question is, how large is the squadron, half or full, that will be moved to Labuan? Please explain or give some detail regarding the economic impact that Labuan will benefit from as a result of that decision. As we are well aware, for the navy, the naval base has already been moved from Labuan to Sepanggar, but whatever the case, Labuan has the largest shipyard, in fact, Labuan Shipyard Engineering, in Malaysia's East. So my question is, can the Ministry of Defence consider giving Labuan Shipyard an opportunity by allocating part of the maintenance or shipbuilding work, which would also ensure the continuity and improvement of Labuan Shipyard's capabilities, which is also part of national defence? Considering that it is the only large shipyard in East Malaysia. For the Army: Labuan, as an air force base, supports ESSCOM from the rear, and at this time we are facing greater challenges or threats. Should the Army also refill the areas that have the Army's existing assets in Labuan, to station at least one company in Labuan? To ensure that the assets in Labuan will continue to be protected in the event of a threat. Labuan is certainly a target whenever there is a threat, as happened in Tanduo recently. In fact, in Labuan we are aware of the tense situation, Labuan Airport has had to be guarded entirely. However, the strength on the ground in Labuan is too small. Next, regarding something I wanted to say while at the Ministry of Tourism but did not have the chance, and which is also related to the Ministry of Defence. In Labuan, every year, a Memorial Day is held, where Labuan has the Memorial Park, or the largest World War 2 cemetery in Malaysia, which every year is visited by senior officials of embassies and also military personnel from Australia, India, Bangladesh, Pakistan, Britain and others.

Datuk Rozman bin IsliUMNO · BNLabuanEN

So, is the Ministry of Defence prepared to make this a bigger event by inviting a larger number of soldiers from Australia and other interested parties who wish to celebrate on a larger scale, as is held in Australia, Anzac Day and so on, where it would contribute to the tourism industry in Labuan. Lastly, regarding Item 060000. Here it is only Supply, but what I want to raise here is about holding the National Service Training Programme in Labuan. In Labuan, we have an island that is equipped with adequate infrastructure, with open halls, accommodation and so on, which is not being used at the moment, and I see that it is very suitable to be made into a National Service Training Centre, as it is an island close to Labuan. It is only a five-minute boat ride, and it would be the only National Service Training Centre located on a small island. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The names submitted have not stood up, yes. Honourable Kluang.

Tuan Liew Chin TongDAP · PHKluangEN

Thank you, Mr Chairman. I want to touch on the details regarding defence administration and also the National Service Training Programme. The most important point I want to raise is that we need a defence policy for the 21st century and not for the Cold War era. I think we have not yet moved out of the policy framework established within the Cold War framework.

Tuan Liew Chin TongDAP · PHKluangEN

What I want to raise is that, first, in terms of defence administration, the open defence policy announced in 2010, the document states that a policy review will be carried out within a period of several years and will be announced and communicated to the people. I ask the ministry, if possible, to bring the issue or the process of formulating this policy to Parliament through a select committee, or at least provide an update or Parliamentary papers or a Parliamentary white paper to inform Parliament of what follow-up or action has been taken on the Defence Policy announced in 2010. The current threat analysis is indeed problematic, I think, given that we failed to deal with the Sulu threat from the beginning. I ask that, if possible, we be informed of what work, task or assignment is being carried out by defence intelligence. It has been said that defence intelligence focuses on domestic politics and not external intelligence, and I think Members of Parliament need to be given the opportunity to understand how the government, or how the Ministry of Defence, especially defence intelligence, handles intelligence issues. According to the information I have received, the army stations three divisions in the Peninsula but only one division in Sabah and Sarawak. Moreover, no fighter aircraft squadron is permanently stationed in Sabah and Sarawak. When the Lahad Datu tragedy occurred, the security forces had to arrange the movement of troops from the Peninsula to Sabah. This further reflects the defence deployment arrangements that remain from the Cold War era, and we need a new policy where, I think, if possible, 50-50, where 50 per cent of the Army is in the Peninsula and 50 per cent of the Army is in Sabah and Sarawak. I hope this can be considered and that this is within the new defence policy framework that we need. We need a new risk assessment and threat assessment in which the threat is not on land but at sea. The threat is not only in the Peninsula but actually also in Sabah and Sarawak. The threat in Sabah and Sarawak is more important and must be addressed with more deployment in Sabah and Sarawak. I think our focus on the Army, which receives two-thirds of the financial resources in the budget, in the estimates, while the Navy and the Air Force are not given the resources they need, I think this must change. Another 50-50, where we must at least give 50 per cent to the Air Force and the Navy together. If possible, focus more resources on the Air Force and the Navy because risks and threats have changed. Risks and threats are no longer in terms of land but in terms of sea, and these risks are international risks, where we already understand that the risks in the South China Sea really require a new approach. Also, the threat in Sabah, where ESSCOM was established, also requires new thinking. I think ESSCOM has been established for more than a year. A new approach is also needed. I ask the Ministry of Defence, if possible, to comment: in the view of the Ministry of Defence, is it better for everything to be placed under the Ministry of Defence, with other forces, civilians or the police, regarded as support forces? Also, if possible, I think ESSCOM would be better placed under the Ministry of Defence and not under the PMD. If it is placed under the PMD, it cannot, there is no, no single person or one division, one ministry or one force that focuses and is responsible, usually in situations where no one takes the most important responsibility, so there is overlap, and some do not take responsibility. My view is that, if possible, ESSCOM should be placed under the Ministry of Defence and the police and other divisions made supporting agencies. I hope this proposal can gain support from friends on that side. Finally, I want to discuss the issue of the National Service Training Programme. For Members of Parliament present here, before 2008 there was actually a Select Committee on the National Service Training Programme. However, that Select Committee did not complete its tasks and the 2008 general election was announced. After that, there has been no review or re-evaluation involving Members of Parliament.

Tuan Liew Chin TongDAP · PHKluangEN

I think the time has come. It has been ten years since National Service was launched, and we need a review, a re-evaluation, in which we, Members of Parliament, are given the opportunity to hold hearings so that the public can give their views on whether we will continue National Service in this format, or whether we will continue National Service in another format, or whether we will abolish National Service.

Tuan Liew Chin TongDAP · PHKluangEN

I think the ministry must at least be prepared to listen to the views of the people and not continue this programme without taking into account the views of various parties, especially from Members of Parliament and also the views of the outside community. With that, I say thank you.

Thank you to the Honourable Member, Mr Chairman. I record my thanks for being given the opportunity to debate Head of Supply 60 – Ministry of Defence; Item 010000 – Defence Administration; and Item 010200, namely Logistics. We are indeed a small country, but perhaps we have the capability to match other countries outside, where expenditure on defence equipment is among the lowest in the region. For us to continue buying military equipment based solely on Western technology is indeed very costly. Continuous purchases of this equipment over the long term are very detrimental, and because of our expenditure constraints, we cannot buy in large quantities. Therefore we cannot, and do not need to, develop our national defence industry. We actually have considerable purchasing power and a very large military demand. Indonesia and Thailand are among the two major powers in this region. Perhaps we can work towards a regional technology and military manufacturing centre together with other ASEAN countries. Our country's problems may also be the same as the problems of other countries. If we regional countries can sit at the same table to discuss what can be worked on together, it becomes a very important and very good factor. I propose that Malaysia become the main initiator of this plan. ASEAN demand, if combined collectively or ASEAN as a whole, is very large. It would produce a large-scale economic effect that would only reduce our costs, between which industrial cooperation in defence manufacturing can be carried out. Regional experts can be shared together, research and development (R&D) units can be strengthened together, and funds can be pooled together. These funds can be grown through fund management, for example where each participating member contributes a sum of money. We and our regional partners need to be more creative in maximising returns for the member countries. Continuously buying military equipment over a long period is not a good thing. If Malaysia wants to move alone, we will not be able to move fast because of the constraints we have. We need to move and work regionally, sharing experiences with these regional funds. I want to go to Item 010100 – Defence Administration and Policy. Among Malaysia's advantages, if we compare ourselves with other populous countries, Malaysia actually has the strength to enlarge its armed forces. Perhaps we cannot match Thailand or Indonesia in terms of military personnel, but we can still maximise the number of our military personnel. I request that a study be conducted on the ratio of Malaysia's population to the number of military personnel. Is our ratio in Malaysia among the maximum? I actually see that we have the advantage to increase our military personnel further. Recently, many social ills have been committed by young people. Rather than having no direction in life, it is better for us to promote and instil them into the armed forces. We need to be more aggressive in carrying out this promotion.

Mr Chairman, I want to go to Item 060000 – National Service Training Programme; Item 060100 – Management; and Item 060200, namely Training, combined together. Perhaps what the Honourable Kluang just mentioned can be taken as a lesson, and we can review the National Service Programme which is implemented with the aim of achieving the following objectives: (i) to raise the spirit of patriotism among the young generation; (ii) to foster racial unity and national integration; (iii) to shape positive character through noble values; (iv) to foster the spirit of volunteerism; and (v) to produce a younger generation that is more energetic, intelligent and full of self-confidence. Based on the objectives to be achieved, the question here is, can this programme instil noble values in the identity of our country's society, because at present we see, especially on social media platforms, that many, especially young people in our society, criticise and use vulgar language. Does the ministry intend to make it compulsory for all young people to join this National Service Camp, because this National Service Camp can nurture a spirit of love for the homeland through the modules that have been instilled in this programme, which indirectly can become a foundation for building identity. Furthermore, the structure of this National Service Training: 20 per cent is basic military training covering aspects of leadership, self-resilience, confidence, development and so on. Some 40 per cent involves national elements covering national history and so on, 40 per cent involves community service elements covering recreational activities, community service centres and so on. The positive aspect to be seen in the implementation of this National Service Training is that it takes place in a cheerful atmosphere, does not stress classroom learning activities, is more recreational in nature, can encourage healthy activities, and can foster unity through interaction among races, as well as broaden national knowledge through elements of history and so on. I humbly request the good offices of this Ministry of Defence to increase the number of training camps for these National Service Training Centres. As I have stated earlier, we are indeed exposed to many things. Especially as we see on social media, it no longer appears as it used to, such as love for the country. Today they criticise as they please, and what worries us more regarding these criticisms is that the criticisms are unconstructive. So we are very worried. Mr Chairman, I humbly support, thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The Honourable Temerloh.

Tuan Nasrudin bin HassanPAS · PRTemerlohEN

Bismillahir Rahmanir Rahim. Thank you, Mr Chairman, for giving me a small opportunity to take part in this debate, and my reference is to Item 040400 – Operations; under Head of Supply 60, Item 040000 – Maritime Defence. If we look at the estimated allocation stated here, it is RM465 million. In connection with maritime defence operations, what I want to raise here is the question of how effective these maritime defence operations are, since recently we obtained data explaining how the security of our national waters has been affected. Particularly in the Straits of Malacca and also the South China Sea, because at least attacks and also robberies on commercial vessels have occurred, to the extent that the losses have reached millions of Ringgit Malaysia.

Tuan Nasrudin bin HassanPAS · PRTemerlohEN

For example, I note that a Japanese vessel carrying a cargo of RM5 million worth of diesel was robbed in the waters off Pulau Ketam in April 2014. Then in June, the commercial vessel MTAI Maru was also robbed in the north-eastern area of Sedili, Johor. A month ago, a robbery took place involving the oil cargo ship MT Oriental Daily in the waters of the South China Sea. All of these are believed to be the result of attacks and threats from pirates who are still rampant in our national waters. So, the security issue in the country's waters, particularly in the Straits of Malacca and also the South China Sea, is something that is indeed of general concern, especially among regional countries involving Malaysia, Indonesia and also Singapore, as well as at the international level. So for this reason, Mr Chairman, we know that Malaysia has also actually been involved in trilateral maritime cooperation, which we see through the TTEG mechanism and also mechanisms involving larger member cooperation involving coastal countries in our region. It also involves international shipping routes close to our country. So for this reason, I want to see how the Maritime Enforcement Agency, namely the Malaysian Maritime Enforcement Agency (APMM), for example, then the Royal Malaysian Navy, and also the Marine Police and also the Marine Operations Force (PGM).

Tuan Nasrudin bin HassanPAS · PRTemerlohEN

Where I feel that these agencies must show the extent of the strength or capacity they possess to eradicate dangerous pirate activities in our national waters recently, because we are very worried in connection with national sovereignty. Mr Chairman, especially when there are changes in maritime security control cooperation involving multilateral arrangements in our country. For example, the involvement of the International Maritime Organization (IMO) after 11 September, which most of the world's security observers are discussing, namely how the involvement of the International Maritime Organization relates to the issue of sovereignty in our country. [The Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) chaired the Committee] Is this really a security control in our country, controlling sovereignty in our country, or at the same time, consciously or not, has it become an entry point for outside parties, especially military forces from other countries, foreign countries entering our country through this IMO cooperation. So, the Malaysian Government must also, at the same time, I ask at the end of this brief speech, to provide a convincing explanation of the current level of security of our country's waters. How effective is the maritime cooperation that has been carried out, and to what extent has it actually succeeded in curbing the dominance and also the rampant pirate activities in our national waters. Once again regarding the IMO, I hope a clear picture can be given of what the real role of the IMO is in helping the security and sovereignty of our country. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Sungai Petani. Look for BN, BN does not want to stand up. Former [Laughter] Yes, the Honourable Member.

Dato' Johari bin AbdulPKR · PHSungai PetaniEN

Thank you, Mr Chairman. I want to begin with Item 010000 – Defence Administration; in particular Item 010100 – Defence Administration and Policy.

Dato' Johari bin AbdulPKR · PHSungai PetaniEN

I would like to ask the Honourable Minister. Recently, someone came to see me with a police report, and it was rather alarming. The issue in this police report is an ordinary one: a car collision. But when they went to the police station, one of those involved, named Lai Xiao Sin, produced a Malaysian identity card. When asked about his occupation, he said he served in the Singapore army. So, in this police report, he states that he works with the Singapore army. Therefore, I would like to ask the ministry: is the ministry aware that possibly, because he says in the report given to me, one of these drivers stated that many of his friends are still Malaysian citizens because they also hold Malaysian identity cards and have not surrendered their identity cards and citizenship, but many serve with Singapore's Ministry of Defence. I would like to ask whether this is an isolated case or whether indeed many Malaysian citizens still hold Malaysian citizenship but serve as soldiers in Singapore. Mr Chairman, I am worried that we do not know how many there are. If the number is large, this could pose a threat to the country because Malaysian citizens are serving in the armed forces. If he worked at a factory, or a furniture factory, that would be a different matter, but when it involves the military, this is extremely serious. So, I request an investigation. I do not intend to give the details here, but inshaaAllah I will give the details to the Honourable Minister shortly.

Next, Mr Chairman, regarding Item 060000 – National Service Training. I have often raised the issue of this national service because we have spent more than RM6 billion, Mr Chairman. RM6,000 million or more since we started this training on 16 February 2004. This is indeed a large sum, and I would like to know whether any research has been carried out on our products. Have they truly achieved the goal of character building and strengthening patriotic spirit? A large amount has been invested in young people around the age of 18, both men and women. In my constituency, I see, I do not know about other areas, that it has not had any effect or impact, not only on the country but on themselves as well. So, if this national service training is really to be continued, I propose, as was also raised by the Honourable Member for Kluang, that there must be a review. If we really want to continue, I suggest why not simply introduce National Service to them. That is, this has been done by other countries, including Singapore, South Korea and many more. If we truly care for our young people who are facing social problems now. Young people who leave SPM, the situation is indeed chaotic now. Recently in Setapak, 20 young people who wanted to rob a handphone, killed their friends, and threw them into a pond. What is this? It is better that we send these young people to National Service. Let them join the army for two years. We teach them properly, not only academics but also military practicals. At the very least, we spend money, we spend funds to train them, but what is certain is that we obtain a good reserve. They can join the reserve in our armed forces, they can use weapons, and most importantly, we can instil the element of discipline in them.

Mr Chairman, any person who is 18 years old and has to join the army, let alone a six-month recruit, I am confident and believe they will have a different character. That is, if he joins at the age of 18, and serves in the military for two years, he leaves at the age of 20. So, he has already passed the stage of mischief, the teenage years. So, when he reaches 20, he enters the job market or continues his studies at college and university, and the government and the people will have secured the position where the teenage years that often trouble them are concerned. Sometimes we see that parents cannot control these children because of the internet and the various exposures they have nowadays. So, I request and propose to the ministry to review whether the module we have now, by sending our children for only three months of national service training on which we spend so much, is this programme worthwhile.

Dato' Johari bin AbdulPKR · PHSungai PetaniEN

The last item, Mr Chairman, is regarding Item 090000 – One-Off. I propose that our armed forces personnel who are not pensioned, some who left after 18, did not get to receive a pension for certain reasons, be considered. Indeed, we are willing to state that they left by their own choice, but we must also realise that although it was their own choice, there are certain other reasons that caused them to leave. So, I propose that the government may continue the one-off payment as we give it to fishermen now and to other parties. This is because these former soldiers have served for so long, with full dedication. Because they are not pensioned, I feel their contributions should not be forgotten. There should be a budget allocated to them every year in the form of a one-off payment. That is all from me, Mr Chairman, thank you very much.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Stampin.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Thank you, Mr Chairman. Items 30000, 50000, 80000 and 90000. Mr Chairman, I would like to take this opportunity to raise two matters. The first aspect is the need for the ministry to maintain the training of our armed forces in facing national crises, where in the current global situation, such crises may occur not only at any time but also in situations beyond our expectations. Mr Chairman, in the current global situation, especially after the 9/11 tragedy, with permission, as well as the global tragedies that followed, most countries have already taken action in facing any crisis that may befall their country. Mr Chairman, the MH370 tragedy is a tragedy that saddens us. I would like to confirm that we do not mind that the government always stands with the families and staff of MH370. I raise this case because it is a case in which all of us, including the ministry, must take sufficient care and attention so that such a tragedy can be avoided in the future. This matter is raised because the MH370 tragedy occurred in the post-9/11 era, with permission, and from the aspect of the aviation world and the Air Force, the failure of the ATC, that is, the Air Traffic Controller, and the Air Force to act immediately shows there was a failure, and indeed not only a failure but a breach of protocol occurred on both sides. This view is also agreed by an aviation expert, with permission, Desmond Ross in Australia. This matter was also raised by me together with the Honourable Member for Bukit Mertajam in the month this occurred. This tragedy also shows that our armed forces were not prepared to face crises beyond expectation that could endanger the people. When MH lost contact with ATC, the military should already have been on high alert and operating, cooperating with ATC, because in the aviation world, MH's failure to re-establish contact for 17 minutes is as good as forever. What is very worrying is that MH was actually detected on radar for hours, but there was no action by our Royal Malaysian Air Force (TUDM) to intercept, with permission, even though the situation should already have been on high alert. The question is, has there been any post-9/11 training for our armed forces? Does this not also show a breach of protocol on both sides, ATC and TUDM, or perhaps even more surprisingly, that no protocol existed? If it existed, what was that protocol, so that we can examine it to prevent this from happening again? Mr Chairman, this matter is critical, and I feel the ministry should issue a detailed report on the failure of both TUDM and ATC to observe protocol. If not, Mr Chairman, I do not want foreign media to report it first, or for it to be made into a documentary, and this will damage the good name of our country.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Imagine if such a tragedy happens again and, due to the same failure, the aircraft is used as it was in 9/11. Mr Chairman, MH370 must be made a lesson for us, and action must be taken immediately, right away, in terms of maintenance, where the capability and effectiveness of our armed forces in facing crises must be examined.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Bukit Mertajam.

Tuan Sim Chee KeongDAP · PHBukit MertajamEN

Thank you, Mr Chairman. Does the Honourable Member for Stampin agree that if I say the ministry or government should issue, publish and table a post-mortem report, especially on the failure of the response SOP to the detection of MH370 by military radar, in this Parliament. Thank you.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Mr Chairman, I strongly agree with the view of the Honourable Member for Bukit Mertajam to issue a report so that we can table it in the august House to prevent this situation, and hopefully it will not happen in the future. Please include it in my speech. The second case I would like to raise is the view of the Honourable Minister on my proposal to hold real-time exercises, with permission, for our soldiers to further improve our military performance in facing unexpected situations. This is the point, the second matter I would like to raise. Mr Chairman, Sarawak is a vast state with a long border. There are many illegal crossing routes as well. Criminals may also take advantage, and have already taken advantage, to commit crimes in Sarawak and cross the border before being detected. So I propose that our armed forces conduct real-time exercises, and carry out joint missions with the police and immigration to overcome the problem of illegal border crossings. This is also a golden opportunity for our soldiers to learn to use the sophisticated equipment obtained by the ministry, as mentioned by the Honourable Member for Lumut. Mr Chairman, in the same vein, since the people of Sarawak have been waiting for the upgrading of the Pan Borneo trunk road to a highway, with permission, many unfortunately have died on that road. Many could have been saved if they were air flown, with permission, to hospital immediately within one hour. I have also raised this case with the Ministry of Health, where we need at least one high-capability helicopter that can withstand weather conditions, which Sarawak's hospitals currently do not have. The helicopters used are not only incapable and unable to operate in bad weather, but also when visibility, with permission, is poor. Mr Chairman, with the same proposal, I propose that TUDM take this opportunity to hold real-time 24/7 red alert ready status exercises, with permission, where they can cooperate with hospitals so that TUDM can use sophisticated helicopters that can operate even in bad weather conditions. To address the needs of Sarawak's hospitals, where there is at least one emergency case requiring air lift, with permission. As raised by the Honourable Member for Kluang, this also enables TUDM to have a force that is always ready to act 24/7 in Sarawak. With this, I request that my suggestions and criticisms be received with an open heart. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Setiawangsa.

Dato' Ahmad Fauzi ZahariUMNO · BNSetiawangsa

Tuan Pengerusi...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Just a moment, Honourable Member, at 5 p.m. later we will conclude the debate for the ministry.

Dato' Ahmad Fauzi ZahariUMNO · BNSetiawangsaEN

I only want to focus on this national service. I have raised the issue of national service in this House several times. As we know, 500,000 young people, especially those who finish Form 5 every year, but every year only 100,000 of them are selected to join this national service. This shows we have a good programme, but it is not comprehensive. I welcome the statement by the Ministry of Youth and Sports that it will discuss with the Ministry of Defence how to rebrand or improve this national service, which has been running for ten years. I would like to propose once again in this House, to give justice to all 500,000 of our young students who leave Form 5 every year. I would like to propose that national service courses or co-curricular activities be integrated into schools. This means that during school holidays, mid-year and end-of-year, they are used for them to undertake national service courses.

Dato' Ahmad Fauzi ZahariUMNO · BNSetiawangsaEN

I would like to propose a mechanism to make it compulsory for these 500,000 people who leave Form 5 to also participate in National Service. If it is not made compulsory, I am also confident that this National Service, although it has been ten years, will not be able to achieve its objectives. That is all, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Tumpat.

Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

This is the Foreign Ministry, isn't it?

Mr Chairman, just briefly. Firstly, I would like to thank you for giving me the opportunity to debate at the Committee stage for the Ministry of Defence, in which I want to focus on Item 020000, specifically Item 020300 – Training. Before that, I would like to support what was mentioned by the Honourable Member for Temerloh about the intrusion into our seas and the role of various agencies in this country. Our seas are very important, Mr Chairman, because nearly 50 per cent of the country's revenue in this budget comes from oil and gas found in our oceans, and our country is very careful in safeguarding this oil and gas, but we are worried that our waters may be compromised by the lack of expertise and good service from these various agencies. We are so protective of our sea resources that the petroleum royalties are not given to the State of Kelantan, but if we do not safeguard them properly, they may be intruded upon by foreign elements. I also support what was mentioned by the Honourable Member for Stampin about MH370. I would like to know from the Honourable Minister what lessons have been learnt from the failure, especially of our Air Force, to trace it to its end, if there is an end to MH370. What I want to touch on under the Item I mentioned earlier, Mr Chairman, is related to joint training between the Malaysian armed forces and the armed forces of other countries. As we see, every year the Malaysian armed forces hold joint exercises with the armed forces of foreign countries. For example this year, according to the report, we are holding joint exercises with the United States Army. It took place around September according to what I could find, in Kelantan and at about the same time in Sabah. The exercise in Sabah reportedly involved 285 United States soldiers and 500 Malaysian soldiers. Meanwhile, the one in Kelantan, Terengganu, the East Coast involved 500 United States soldiers, which was described as an annual joint exercise, it is an annual affairs named Keris Strike.

Malaysia also holds annual exercises with the five countries with which we have the mutual defence arrangement, namely the Five Power Defence Arrangements with Australia, Singapore, New Zealand and the United Kingdom, which this year is called Exercise Shield 2014. It is also expected, according to reports, and I would like to know from the Honourable Minister, whether it has been implemented, that is, are we also planning to hold joint exercises with the Royal Malaysian Navy and China? This is an interesting development, and I would like to know from the Honourable Minister and the ministry what are the benefits and advantages that we can gain from these joint exercises? Is it necessarily beneficial to us, or do we also consider that perhaps the outcome is not as such, that the gains are not for our country but for the countries with which we hold joint exercises? The reason is that they may very much want to be with us only to defend their own interests, while our interests, we ourselves cannot obtain any benefit from that exercise. So, I want to ask, is that an advantage to us? Secondly, I want to ask, if we can hold joint exercises with the United States armed forces, the Singapore, Australian, New Zealand, United Kingdom armed forces and so on, do we also plan to hold joint exercises with, for example, Indonesia as a large neighbouring country with a strong army, or with distant countries? If we can hold them with Australia, New Zealand, the United States and the United Kingdom, why not with countries like Turkey, for example, from which we have bought military equipment? Why don't we hold joint exercises with them as well, so that we can learn from the experience of a country with great military strength, Turkey, which can rival the European countries and which in its history was able to rival the world powers of that time. So, those are the questions I wish to raise. Next, visits by foreign armed forces, especially by foreign naval ships. Does the Government of Malaysia intend to have certain policies and guidelines, for example, we of course want to allow foreign military ships to visit, but foreign ships, for example those carrying nuclear weapons, we want to bar from visiting Malaysia, because we do not want our country and the Southeast Asian region to become a place where nuclear weapons are present, for example. Like New Zealand, which has such a policy, Mr Chairman: since 1987 there has been an Act that makes New Zealand a nuclear free zone. Naval ships or the like that are armed, and even those that are nuclear-powered, are not permitted to approach within 20 nautical miles of the land or soil of New Zealand. Do we want to have that policy, because since around 1970 we have had a policy called the Zone of Peace, Freedom and Neutrality (ZOPFAN) for the Southeast Asian region? So, I hope this will be taken into consideration by us, so that we protect our country, our region, our land, from being threatened by enemies who, even in the form of cooperation, certainly have their own intentions. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Jerlun.

Dato’ Othman bin AzizUMNO · BNJerlunEN

Thank you, Mr Chairman, for the opportunity given to me to take part in the debate on the special budget presentation for the Ministry of Defence. I refer to B.60 Item 010100 relating to administration and defence policy, which receives an allocation of RM541 million. Among the objectives under this heading is ensuring the welfare of Malaysian Armed Forces (ATM) veterans and their families. We are aware that 13,791 former ATM veterans are currently receiving the ATM Veterans Welfare Assistance Scheme, and I think this figure is the same as in 2014. We are aware that all these veterans have already served the nation greatly and sacrificed much during the 1970s and 1980s, when there were still many issues closely related to bandits and so on.

Dato’ Othman bin AzizUMNO · BNJerlunEN

This is especially so because the Army had to be deployed to carry out various operations in places that were under threat. We are aware that many of their welfare needs involve them still seeking suitable housing, whether low-cost housing or, if any, for example in rural areas, where they decided to retire and remain in their parents' homes as before, and they also need to repair houses, build new houses and so on. So I want to ask the ministry, do these individuals under the ATM Veterans Welfare Assistance Scheme receive a green light or special attention from the ministry, or perhaps under the Ministry of Rural and Regional Development (KKLW) and so on? This is because we see that many of them have suffered permanent injuries, for example from booby traps and so on, and today their lives are rather marginalised and may even be destitute. So of course we are aware that previously there were some among them who had gone through various transitional courses while waiting to retire. Perhaps some of them are now also involved in small businesses, among them perhaps those who have succeeded in small and medium industries, but because some were previously working in workshops and in engineering and so on, but due to government policy, the policy of the Ministry of Works, the Class 'F' licences have been closed, so they no longer have the room and so on to obtain those licences.

Dato’ Othman bin AzizUMNO · BNJerlunEN

So, does the Ministry of Defence intend, I think it could discuss with the Ministry of Works, to reopen the opportunities for these veterans to be considered for Class 'F' approval and so on according to their respective skills. We also often hear that many of them apply for taxi permits and so on. However, perhaps on certain grounds these individuals still have not obtained those permits and have to rent permits from people who have already succeeded. So, of course we very much hope that, although there is indeed a policy to care for their welfare, the government will further strengthen the Malaysian Armed Forces Veterans Association (PBTM) and also the Army Veterans Association and so on. So, we want the ministry to give specific focus to these individuals according to what is appropriate for each of them. Next, Mr Chairman, regarding B.60, Item 060000 relating to the National Service Training Programme (PLKN), which receives an allocation of RM612 million, as many of your fellow Honourable Members have already raised. We are aware that this is supposedly a measure to give exposure to young people, especially those who have completed the SPM, to attend courses to strengthen identity, understand the nation's history, and thereby enhance love and affection for the country, and of course to instil affection among the various races. However, we have heard a story that a study was carried out which found that 500 or 600 of these trainees were unable to speak Bahasa Malaysia. So this is a shock, so perhaps this subject needs to be included in the training modules, because we want every citizen, especially young people, to be able to speak Bahasa Malaysia confidently and well, because that is one of the tools for communicating to strengthen affection among the races in our country. Apart from that, I understand that previously an alumni, or something like an association or club, was set up among former PLKN trainees. So, how effective is this club, and to what extent can the energy of more than 500,000 people each year be mobilised again to continue to be part of the mainstream of national development?

Dato’ Othman bin AzizUMNO · BNJerlunEN

Because we do not want, although in our time perhaps there was no concept of National Service Training and so on, we were still able to remain in the mainstream alongside other communities. However, we are worried that if we downplay this matter, our young people will certainly lose their way from time to time. Next, Mr Chairman, regarding the Wataniah soldiers, we just want to know what the government's policy is at present, whether it intends to increase intake among the public to be involved in Wataniah training and so on? Because today I rarely see Wataniah platoons, especially in Parliamentary constituencies. So, what is the government's plan for the future to involve more of the public who have no understanding at all of military activities or training, but who could be imbued through these Wataniah activities in the future? Sekian, thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Jelebu.

Thank you, Mr Chairman. I also take part in the debate at the Committee stage on B.60, Item 030000, Item 030200 and Item 030300. Mr Chairman, first of all, regarding the 8x8 armoured vehicle programme undertaken by the government with a company, which at one time was reported to have over 260 units for the government or the armed forces. So, I request the ministry to inform us of the progress of this project. Has it been completed? How much has been paid, and how effective is this 8x8 APC to our defence system or our army? That is the first. Secondly, I want to touch on a camp in my area, the Kongkoi Army Camp. I have been informed that it has already been turned into a training centre for students of the National Defence University. So, I would like to request an explanation from the ministry: what are the actual plans of the ministry or the National Defence University for the camp or army area at Kongkoi? Are there plans to upgrade it into a university campus, or only for certain training? However, I suggest that the university or the ministry consider making it a campus of the National Defence University because of its strategic location and facilities for relevant military training.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Can the Honourable Member for Jelebu ask for a brief clarification?

Ya, sila.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

The Honourable Member for Kuala Krai. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

It seems like there is no opportunity to speak, this.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

[Laughter] No, this is related to what the Honourable Member for Jelebu mentioned, namely the Kongkoi Camp which belongs to the Ministry of Defence but, I am informed, has been handed over to the National Defence University of Malaysia (UPNM). I have received information that this camp has not actually been certified in terms of fitness for use by the army. So, is it appropriate and safe if it is handed over to the National Defence University for use by its students who are attending courses? This is because it may expose them to danger. I raised this argument during the debate at the policy stage, that an incident has occurred: a police report was lodged because a student died during training at that camp, which at the time used equipment that was not recognised or certified as safe. So this is a very serious matter. So, does the Honourable Member for Jelebu know about this matter, and can the Ministry of Defence explain it or not? Thank you.

Thank you, Honourable Member. I also want to be informed about the Kongkoi Camp, because I do not know its developments. However, I can see from afar that the Kongkoi Camp has undergone a process of rehabilitation and upgrading in terms of physical structure, buildings and so on. However, I cannot confirm the facilities inside it, and I think the Ministry of Defence or through the National Defence University may have information for us to share together in this august House. So, lastly, what I think is important is that in the matter of defence, we as a government should take the lead over our enemies, or those who may threaten the country, earlier, one or two steps ahead of them.

Whose role is this? This is the role of the intelligence unit. We want the ministry to explain to what extent the human intelligence of the army is effective? This is because intelligence should, in fact, be able to anticipate. So, I mention this because in the case of the intrusion at Lahad Datu, we cannot wait for the country to be invaded before we learn that the enemy is already inside the country. However, the intelligence unit is a very important component within the country, especially in the defence system of the Ministry of Defence, because they should be able to provide early information to our defence system about threats that will come in the near future, and this enables us to defend the country earlier than we otherwise would. Therefore, I want to know from the ministry: how strong is the intelligence unit within the armed forces? How are the trainings, what is the situation now, do they have trained and sufficiently capable personnel? I want to propose that, because this intelligence unit is an important asset, those who have already retired should be continuously engaged as a support group or reinforcement for this intelligence unit, so that it becomes the most important unit and a unit that can inform our defence about the actions and threats that are coming. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kepong next, all these PAS members. Many Menteri Luar from this PAS.

Tuan Idris bin Haji AhmadPAS · PNBukit Gantang

Pertahanan, Pertahanan.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Oh! Ministers of Defence, many. The Honourable Member for Kepong next is one from PAS; later we will call the Minister to reply.

Dr. Tan Seng GiawDAP · PRKepongEN

Mr Chairman, briefly only. 050000 – Air Space Defence. Mr Chairman, yes, now we have the fighter aircraft Sukhoi Su-30MKM, Boeing F/A 18 Hornet, Mikoyan MiG-29, BAE Hawk and Northrop F-5, that is recognition. I want to know from the ministry, to what extent will all five types of aircraft be replaced? This is because we know some of them are no longer very suitable for the present time, as some are already dilapidated. If we want to replace them, what is the ministry's plan to acquire new fighter aircraft? Next, regarding our air defence system, that is our army's main radar defence and the commercial radar, which is not the main one, radios commercial. So far I see that the government has already disclosed raw data from our system, and normally we cannot do that because this will compromise national security. This is because of the MH370 tragedy, we cannot avoid it. To what extent is the ministry improving this situation, because our mistake has already had an impact. Sekian, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Let us give it to the Honourable Member for Bukit Gantang, okay. That's enough, Honourable Member. He's on the other side, he's on the other side.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Assalamualaikum and thank you, Mr Chairman. I want to speak on B.60 – 050000 Air Defence. So, I want to ask for an explanation regarding the aviation upgrade project for 27 Nuri helicopters and 14 C-130 aircraft, which was reported to have been awarded to AIROD Sdn. Bhd. in January 2014. Is it true that eight units of the C-130s out of 14, meaning only six units can be upgraded, and 20 units out of 27 cannot be upgraded? I request an explanation: why was this project awarded to the company AIROD by direct negotiation, and what is the cost of this project? What are the steps to upgrade the 27 Nuri helicopters and 14 C-130 aircraft, is this more economical? Is it a wise step, especially from the aspect of national security? Why has the government not tried to buy new aircraft? The second issue is that I want to obtain an explanation regarding the Network Centric Operation (NCO) project that was awarded to SAPURA in March 2012. My question is, what is the cost of that project? I have been informed that the project should have been completed within 12 months from the date of the Letter of Acceptance (SST). Until now, is it true that the delay is due to SAPURA's inability to implement it, to the point that the user, namely the army, is dissatisfied? This is because more than two years after the project was awarded, it still fails to submit a solution. Sekian, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That's enough, Honourable Member. It's alright, the sequence has already arrived. No need, that's enough, Honourable Member, okay. Other ministries then, Honourable Member, okay. Thank you, Honourable Member. Yes, please, Honourable Minister.

Datuk Abdul Rahim bin BakriUMNO · BNDeputy Minister of Defence · KudatEN

Thank you to the Honourable Members who took part in the debate at the Committee stage on the Ministry of Defence. We thank you very much and will take note of any proposals put forward to improve the governance of the Ministry of Defence. On any sensitive matter that could compromise our national defence, we will not answer, and the Honourable Members must understand this.

Honourable Members, several issues were raised by Honourable Members a little while ago, and the most popular issue was raised by several Honourable Members concerning national service. Several Honourable Members who took part in the debate, such as the Honourable Member for Sungai Petani, the Honourable Member for Setiawangsa, the Honourable Member for Lipis and also the Honourable Member for Kluang, raised matters relating to national service. As Honourable Members are well aware, the national service training carried out in this country is a unique national service training, which is not the same as what has been implemented in other countries such as Singapore or Taiwan, because it is a military conscript. When we established national service in 2004, it had four main objectives: (i) to build the identity of our young people; (ii) to create a spirit of patriotism; (iii) to create racial integration among the trainees;

Datuk Abdul Rahim bin BakriUMNO · BNDeputy Minister of Defence · KudatEN

(iv) furthermore, to enable them to become Malaysian citizens with a spirit of volunteerism.

Datuk Abdul Rahim bin BakriUMNO · BNDeputy Minister of Defence · KudatEN

As I have often explained in this honourable House, these objectives have indeed been achieved to some extent, based on the studies that have been carried out. In 2010, Universiti Kebangsaan Malaysia conducted a study on this national service. From the results of that study, more than 80 per cent of the study showed that it gave positive signs for our young people. Likewise, in 2013, another study was carried out by Universiti Malaysia Perlis, looking at the aspect of patriotism, and this too showed very large positive signs, exceeding 80 per cent, that we obtained from the results of that study. Therefore, although we have spent, as stated earlier, roughly almost RM6 billion, I believe that even though the expenditure is so large, it is an expenditure that provides benefits to our young generation, because at this time we have already trained almost 800,000 of our young people. Indeed, we cannot train all of them because of financial constraints. The programme we have provided at present has also involved a very large expenditure. If we implement what has been proposed, namely a national service military conscript, it will have a very large financial impact on our country. If we are prepared to spend that much, perhaps we can consider it, and that is why, after ten years of PLKN operating, we have already taken one step. The Ministry of Defence has already discussed this at ministry level and has already decided to hold a programme called the PLKN Transformation Programme, and some agreements have already been made, namely to bring PLKN into a laboratory, which is a laboratory to be run by PEMANDU. From that laboratory, of course, we will be able to get a lot of input. In addition, we will also hold many consultations or public consultations with members of the public, whether parents or NGOs, as well as camp operators and the stakeholders involved, because we consider that this programme is one that has a major impact on the people and the future of our country, especially our young people. Of course, input from the community is important. This is because it will give us a good conclusion and enable us to run a programme that truly benefits the community and especially the young people we train. Honourable Member, please.

Dato’ Johari bin AbdulPKR · PHSungai PetaniEN

Thank you, Mr Chairman. I would like to ask the Honourable Minister whether the research or study carried out on former trainees of the National Service Training Programme was conducted immediately after they completed the programme, or whether the study was conducted after they had undergone the training for one or two years? If we ask those who have just come out of the camp, of course they will say okay. However, if we look at them returning to society, I am not convinced that there is any major change in them, because it is three months, Mr Chairman. These children are sent for three months; in the first month they are only just acclimatising, in the second month they are only just learning the curriculum. By the time, after three months, I think they go home, and they forget, just like that. Therefore, with this large amount of money, I think we must- review it. What we asked for, review it again, because RM6 billion, RM6,000 million, is a very large sum. I have observed, and what I am sure of, is that the children come home happy because they get equipment. They get shoes, they get boots and uniforms, and they are happy about that. However, I do not expect the knowledge they gain to remain, to be able to, not only give strength to themselves, let alone contribute to society. What we have asked for, can the ministry really take the time to review this curriculum again?

Dato’ Johari bin AbdulPKR · PHSungai PetaniEN

Is three months suitable for us to change the way of thinking of these 18-year-old children, when they have already been in school for such a long time? But can we, in those three months, change the way they think and act? Thank you, Mr Chairman.

May I add a little, Honourable Minister? Mr Chairman, thank you Mr Chairman, thank you Honourable Deputy Minister. I heard earlier that 800,000 students have taken this course. What I want to ask is, how many have received permission to go to the National Service Training Programme but refused? The number of students who have refused, and for certain reasons refused to go to the National Service Training Programme, that is the first. Second, what prerequisites have we set for selecting these students? Have any prerequisites been set by the ministry? How is the interaction with schools when selecting these students to attend the National Service Training Programme? Thank you, Honourable Minister.

Supplementary, Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Dungun, Honourable Member. Yes, please, Honourable Member.

From the efforts that have been made by the National Service Training Programme, as mentioned, one of the achievements sought is to enhance the elements of volunteerism among these trainees after they have completed their training period. Can the Honourable Minister mention examples of the efforts in volunteerism that have been taken so that we can see how we should properly combine their energy when there is a need for the importance of that volunteerism? For example, during the major floods in the country that occurred in Kuantan, in Kemaman and in Dungun, we did not see this aspect. It should have been given attention to the importance of some of those volunteer efforts. Thank you, Mr Chairman.

Thank you, Honourable Member. The Honourable Member for Sungai Petani raised matters about this training a little while ago. As I said, we are in the process of carrying out a transformation that will be implemented in the near future. So, in this transformation process, of course, all the views of stakeholders will be taken into account to ensure that the National Service Training Programme to be implemented, at least for the next decade, is a National Service Training Programme that will be able to provide benefits to our young people and our generation in the future. Regarding volunteerism, I would like to state here that as an offshoot of this PLKN, we have also prepared a National Service Volunteer Brigade Programme, in which trainees who have completed and who have become Alumni of this National Service Training Programme will be gathered in the National Service Volunteer Brigade (BSKN) Programme, and they will be trained in several projects and programmes that are carried out. For example, to carry out community work, to get involved in managing flood disasters or any emergency that occurs. We also - for example, in the Sukan Malaysia that was held in Perlis recently, BSKN contributed more than 1,000 volunteers to assist in that programme. We also, from time to time, prepare them. We have no fewer than 150,000 BSKN members who can be mobilised at any time to provide assistance. So if there is a need in the future, the Honourable Member may contact us and also PLKN or BSKN to obtain that service. As I explained, I also wanted to answer earlier that those who are selected are selected at random.

They are selected based on births of 500,000 a year, and when they are selected at random, they will be asked to attend PLKN. If they have to face examinations or continue their studies, they must apply to obtain a deferment.

Usually we have no problem giving deferments, because we realise that afterwards they will be allowed to rejoin after the deferment is granted. The Honourable Member for Jerlun raised matters relating to the welfare of veterans of the Malaysian Armed Forces. For the Honourable Member's information, there are in fact two agencies that have been established by the government to look after the welfare of veterans of the Malaysian Armed Forces, namely the Veterans Affairs Department (JHEV) and the other is the Ex-Services Affairs Corporation (PERHEBAT). The Veterans Affairs Department (JHEV) is responsible for managing pensions, health assistance, educational assistance for children and housing for veterans. Every year we allocate roughly, if I am not mistaken, 200 houses each year allocated to be built for soldiers who do not have houses and who have dilapidated houses, and we provide them through a project called jiwa murni, namely building houses and also repairing soldiers' houses. We also provide assistance to those affected by disasters, and some assistance is also provided by the Ex-Servicemen Associations or Veterans Associations, which are also very attentive and provide assistance to their members. Meanwhile, PERHEBAT is responsible for providing skills or training to soldiers who will retire and also those who have already retired. This is intended to provide them with reskilling or re-skilling so that when they leave the workforce or complete their contracts, whether 13 years or 21 years, they can obtain careers in other places or start businesses. Recently, the government has allocated an amount of money to PERHEBAT to improve services to these retired soldiers. The Honourable Member for Tumpat raised the issue of training...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Honourable Minister....

In relation to housing.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Member for Sepang.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you, Honourable Minister, thank you Mr Chairman. I would like to ask the Honourable Minister, what steps have been taken regarding what was raised in the National Audit Report relating to the management of funds and records relating to pensions involving the Malaysian Armed Forces, where it is stated that, overall, the records data that are not updated are incomplete, differing, repeated, inactive, inaccurate, of doubtful authenticity, and the absence of record coordination may cause pension payments to be made to pensioners and improper payment to occur? So I would like to ask the Honourable Minister, how could this situation happen? As with voter data, there are voters who have not been entered into it. So what are this ministry's steps to solve this problem? I would also like to ask, in the National Audit Report it also states that although they have provided that assistance and they show houses where these ex-soldiers, who are so dilapidated, show the condition of their lives is very bad. So although they have served the country, with the assistance given, they cannot be lifted out of the poverty line. So I would like to ask what steps the ministry will take? Thank you.

Dr. Lee Boon ChyePKR · PHGopengEN

Continuation, Honourable Minister...

Mr Chairman (Datuk Seri Dr.Ronald Kiandee)EN

Want to give way to the Honourable Member?

Dr. Lee Boon ChyePKR · PHGopengEN

Regarding pensions.

Relating to housing.

Dr. Lee Boon ChyePKR · PHGopeng

Pencen.

Perumahan.

Mr Chairman (Datuk Seri Dr.Ronald Kiandee)EN

Honourable Member for Dungun.

Yes. Thank you, Mr Chairman. If we look at the housing provided, as stated in the Honourable Minister's reply a little while ago, specifically for veterans of the Malaysian Armed Forces (ATM), the construction of houses is one matter. The second matter is how some of these pensioners of the Malaysian Armed Forces do not have land on which housing can be built for them. So part of the rights that should be obtained after retirement is to obtain the right to a housing lot. I do not know about other states, but in the state of Terengganu it is sometimes difficult for them to obtain even when applied for collectively. So I hope attention will be given to this very important and critical issue of housing after they retire from service in the Malaysian Armed Forces, because we must remember the saying of the Prophet SAW... [Reciting a fragment of hadith] which means, you are helped and supported by the weak among you, and some of them, when they retire, whether they are pensioned or not, have major problems with housing for their families and themselves. Thank you, Mr Chairman.

Terima kasih.

Dr. Lee Boon ChyePKR · PHGopengEN

Regarding veterans' pensions.

I will answer first, otherwise I will not be able to answer all of them. Honourable Member, regarding the housing lots for soldiers, I want to answer that indeed the Armed Forces Council Order (PERMAT) has already been established, but the land issue involves the state government. Therefore, if any state government wishes to help, it is welcomed. Perhaps the Kelantan State Government can also help, the Selangor State Government can also help and the Sabah State Government can also help. However, this depends on the supply of land. It is not easy for us to obtain a supply of land as before. However, we always want to strive to provide assistance to our military veterans, and if there are state governments that are prepared to help us, we are ready to facilitate. The Honourable Member for Sepang raised the matter of pensions. Indeed, the National Audit Report has explained that there is a slight problem with pension payments. This is because everything originates from the problem that heirs of deceased persons did not inform JHEV about the death of the pensioner, and the heirs also did not report the death, which caused the National Registration Department to have no record of the death of that person. So this is closely related to payment using EFT, because we have two types of pension payment used to pay pensioners, namely the first, through a bank, where anyone can come to the bank to get the pension, that is, they come, they sign and get the payment. The other is payment through Electronic Fund Transfer (EFT). So Electronic Fund Transfer, although it is efficient, has a problem, namely that the money is credited directly to the account of the pension recipient. But the problem here is that when he dies, sometimes the heir does not inform that the recipient of the pension has died. However, if it is paid to the widow, it is not a problem, even though it is a posthumous pension. Finally, it is a posthumous pension and that amount is not different and not a loss, because it is still paid to the legitimate beneficiary.

However- nevertheless we have discussed and taken note of the remarks of the Audit Department, and some mitigation actions have already been taken, for example to send letters for recovery of over-payments of pension to the heirs or relatives, and also by way of encouraging them to use the service as before, that is, they themselves come to the bank to claim the pension. We may consider whether to discontinue the use of this EFT in the future. That will be discussed...

Sedikit, sedikit.

Although this is a matter that will cause complications, I think more and more people are retiring. This will create problems for the Veterans Affairs Department (JHEV) because sometimes communication is an issue. When they do not report to the National Registration Department, we cannot detect whether a person has died or not. However, for the Honourable Member's information, the figure that was mentioned earlier of 12 million, the actual figure that we should collect from this repayment is only approximately 2.8 million.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Just briefly. I want to ask the Honourable Minister. Thank you, Minister, thank you, Mr Chairman. If it is true that there is a problem in terms of collection, and the audit even says there are overpayments, that is our concern. As the Minister said earlier, if the payment does go to a widow and she is entitled to a pension, there is no problem. My first question, Minister, is this. I can accept a written reply, no problem. What exactly is the overpayment, especially last year? Perhaps this year, if there is any. How much is the overpayment? Secondly, if this problem really exists, I think there must be a mechanism that we need to put in place to at least minimise it, if it cannot be eliminated, to the smallest extent possible. This is because we are afraid this money will be used by people who should not receive it. So this involves the people's money too. We therefore hope there must be a proper and effective mechanism. I am worried that if this happens in the Ministry of Defence, it is not impossible that it also happens in other institutions. So if we add up all these overpayments, there would be quite a lot. This is a matter that must be taken seriously by the ministry. Thank you.

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Deputy Minister, Hulu Rajang.

Yes, thank you for that remark, and we take note of it. As I explained earlier, various mitigation measures are being drawn up because this has already been pointed out by the audit side. I believe the Veterans Affairs Department will take steps that can resolve this problem. If it cannot be resolved 100 per cent, it can at least be reduced. The Honourable Member for Tumpat ....

Dr. Lee Boon ChyePKR · PHGopeng

[Bangun]

Tuan Wilson Ugak anak KumbongPRS · GPSHulu Rajang

[Bangun]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Gopeng and the Honourable Member for Hulu Rajang. Yes, the Honourable Member for Gopeng.

Dr. Lee Boon ChyePKR · PHGopengEN

The veterans' pensions just now. Thank you, Mr Chairman. This is specifically about those veterans' pensions. As it happens, I have raised this question before, and the Honourable Member for Arau had just come in and did not answer at that time. Up to today I have not received the written reply I was hoping for. But the Minister is here and can answer this. Because we see a significant difference between veterans of the past and veterans of the present in terms of pension receipt, even though they ended their service at the same rank. Those who have just retired and ended their service receive double the pension compared with those who ended their service perhaps 20 years ago.

Dr. Lee Boon ChyePKR · PHGopengEN

So will the ministry harmonise the new veterans and the old veterans in terms of pension recipients? Thank you.

Thank you, Honourable Member. This indeed happens not only among military personnel but can be said to apply to the entire public service. Those who are on pension, Members of Parliament too, the people who retired earlier and those who will retire in the future are not the same. So if we want to carry out this exercise, we would have to do it across the whole public service. That means it would cost a very large sum, Honourable Member. So indeed, a general with three stars in the 1960s may have a pension equal only to that of a lieutenant colonel or a colonel. We do acknowledge that this happens, but to conduct such a large exercise would involve a very large cost. Honourable Member...

Tuan Wilson Ugak anak KumbongPRS · GPSHulu Rajang

[Bangun]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Hulu Rajang, Honourable Member.

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Hulu Rajang, Honourable Member. Thank you, Deputy Minister, thank you, Mr Chairman. Regarding housing for the Malaysian Armed Forces Veterans Association in my area, Honourable Member, the constituency of Hulu Rajang or P215 Kapit, we have more than 1,000 veterans of the armed forces, and they have defended our country, Honourable Deputy Minister. So every time I am invited to officiate at their annual general meetings, they have complained to me that, to provide housing for them now, they are 60 years old, 70 years old. For my own part, I hope you will look on them with pity too. The land is already there, Deputy Minister. So I respectfully request, if possible, that the Minister in the Prime Minister's Department who is here should bring in the PR1MA Housing Scheme to help them in Kapit. They have a very large area of land. So I respectfully ask the Ministry of Defence to look at this more thoroughly and provide so that they can get assistance from our government. Repay the favour, Honourable Member, these people defended our country. Thank you.

The Honourable Member himself is well aware that the Barisan Nasional Government is a government that has always been deeply concerned about the welfare of military personnel who have sacrificed their lives to defend the sovereignty of our country and also the security of our country, especially when there were threats to our country's security in past decades. However, I would also suggest that, apart from the initiatives that can be undertaken by the Ministry of Defence through the housing project we provide for former soldiers, which is 200 units a year, it is indeed not sufficient. We want additional allocations so that more people can benefit. But one of the initiatives that can be undertaken is that perhaps the Honourable Member could liaise with SPNB to take certain steps. Apart from that, there is also an annual PPRT allocation given to district offices. That is also one of them. But the most important thing is that we can also help them through the Projek Jiwa Murni. Projek Jiwa Murni is a project provided by the Malaysian Armed Forces to help build or repair dilapidated houses, and perhaps with the help of Honourable Members, it can provide assistance to them. In my own constituency, I have repaired about 100 houses of poor people in my area, dilapidated houses, using Projek Jiwa Murni. So that is one approach that can be taken to provide assistance to them. The Honourable Member for Tumpat raised the matter of training conducted between members of the Malaysian Armed Forces and foreign armed forces. As I would like to inform, the Malaysian Armed Forces always conduct exercises to enhance professionalism among our military personnel.

For example, the latest is KRIS STRIKE, or what was carried out together with US PACOM, or United States Pacific Command, which was held in Kelantan. In fact this is one of the exercises conducted, namely the human disaster relief exercise. This will certainly benefit our armed forces and also both sides. Training with FPDA, for example, with Britain, Singapore, New Zealand and Australia, which are our partners in the FPDA, is also always held, and all these exercises are conducted based on the Memorandum of Understanding that we signed between both sides, so that when these exercises are carried out, they are organised training with neighbouring countries too. We also hold exercises from time to time. Because in this way it will not only benefit the enhancement of the capabilities of our military personnel, but most importantly it will also create what we call military diplomacy. It will forge friendship among personnel and of course it will reduce all tensions between one country and another. The Honourable Member for Temerloh, regarding the issue of piracy in the Straits of Malacca and also in the South China Sea.

For the Honourable Member's information, piracy is indeed an issue that we must address, and the Royal Malaysian Navy together with the Malaysian Maritime Enforcement Agency (APMM) and the Marine Police will always work together to protect our security interests. As we know, the Straits of Malacca is protected by the littoral states, which are the three countries that have interests in the Straits of Malacca, namely Malaysia, Indonesia and Singapore. So these three littoral states work together to ensure the Straits of Malacca route is always in a safe condition, although occasionally there are piracy threats, and these piracy threats sometimes involve certain groups, and we always work together to overcome them. Apart from that, the Honourable Member raised matters relating to the IMO. For the Honourable Member's information, the International Maritime Organisation is an international organisation responsible for being the regulator of the maritime sector across the world. They are responsible not only for ensuring safety but also security for waters, and cooperation from the IMO, which is headquartered in London, is something we often welcome, although in fact the IMO falls under the Ministry of Transport. They work more closely with the Ministry of Transport, but in issues relating to safety and security, we always work together to help and resolve them. The Honourable Member for Kluang raised the matter of the imbalance in the strength of army formations in the Peninsula, Sabah and Sarawak. For the Honourable Member's information, as someone who originates from Sabah, I too would like to see an increase in defence capacity not only in the Peninsula but also in Sabah and Sarawak, following recent developments in the defence domain today, and several new threats that exist, especially in the South China Sea and also the Sulu Sea, which is a matter we must pay attention to. Therefore, in the recent budget, the Prime Minister announced several new initiatives, namely to reinforce our fighter jet squadron, the Hawk, which will be returned to Labuan. As for the details of whether it will be a full squadron or half, I will inform the Honourable Member for Labuan later, and it means to protect our airspace. Apart from that, I would also like to inform that in Sepanggar we also have a Naval Base, and in Kuching we have a headquarters base of the Army.

We will also upgrade the Brigade in Sabah to a division, and we will reinforce the formation of several more battalions in the East Coast area, particularly as announced by the Prime Minister, there will be one more battalion that will be sent to the East Coast in the very near future. These are the initiatives. We acknowledge that changes in threats have occurred. In the past, threats were concentrated largely in the Peninsula because of the Communist threat, but today the threat has shifted, especially to Sabah and to some extent to Sarawak, but we must take the necessary steps to ensure that these threats can be overcome perfectly. The Honourable Member for Kluang also raised- PLKN, I have already answered this, Honourable Member. The Honourable Member for Sungai Petani raised the matter of giving a one-off payment to former soldiers who are not on pension. As the Honourable Member is well aware, some time ago we already gave a one-off payment to our military personnel, not fewer than 80,000 people, who benefited, with an allocation of more than RM80 million that we gave, namely RM1,000 per person. This is a good proposal and we will consider it. If the government has the financial capacity, it will not be a problem, because we also take note of the problems of military personnel who are not on pension and who have given their services to the country. The Honourable Member for Jelebu raised a particular issue, namely the issue relating to the AV8 or 8x8 armoured vehicle project, which I wish to state here: the 8x8 project implemented by the government is a replacement project for several armoured vehicles of the Malaysian Armed Forces that have become very obsolete, which were purchased in 1983, that is 27 years ago. Therefore, after almost 27 or 28 years, we must acquire a better vehicle in line with current needs, and for that reason the government has bought, or requested, that the company that has been appointed, namely the Malaysia-Turkey consortium, which is a consortium involving FNSS and DEFTECH, supply 257 units at a cost of RM7.55 billion, which has been implemented. It is expected that this year we will be able to receive at least 12 units of the AV8 that have been ordered. The Honourable Member for Kepong raised the matter of replacement, or how far the fighter aircraft that we will replace, especially the MiG-19, the MiG aircraft that we own which have exceeded more than 20 years and need to be replaced. Indeed, the government through TUDM plans to end the operation of the MiG-29 fighter aircraft, which should have ended in December 2015, and the F-5E/F aircraft in 2014. However, for the time being, we have not yet made a decision because, although there is indeed a need, it involves a large cost, and we plan to buy MRCA, or Multi-Role Combat Aircraft, to replace the MiG aircraft that we feel must indeed be replaced. The Honourable Member for Lipis made a proposal on the need to hold defence industry cooperation among ASEAN countries. For the Honourable Member's information, defence cooperation among ASEAN countries has indeed already been established through what is called the ASEAN Defence Industry Collaboration, which is a platform to enable ASEAN countries to share experience and knowledge in these defence industry fields. Although there are still constraints and challenges because it involves each country's defence, it is hoped that this cooperation can become a platform that advances the regional defence industry without having to depend entirely on Foreign Organizational Equipment Manufactured (FOEM). So, indeed we promote this cooperation because we regard it as cooperation that will benefit our country.

[Deputy Speaker (Datuk Haji Ismail bin Haji Mohamed Said) chaired the Committee]

That will be able to give value for money to the development of our defence industry. Honourable Lumut has raised many issues. He is a retired member of the armed forces and is concerned about several matters relating to the Ministry of Defence (MinDef). We thank him very much for his several criticisms and reminders. On certain matters we may share the same view regarding those needs. For example, he has asked us to enhance and strengthen the operations of the Malaysian Armed Forces in the East Coast of Sabah. For the Honourable Member's information, as I explained earlier, the government's MinDef does indeed have a defence component in ESSCOM. This is because ESSCOM is a body established involving several other agencies such as the Royal Malaysia Police (PDRM), the Malaysian Maritime Enforcement Agency (APMM), and the defence component, namely from the Malaysian Armed Forces. However, in this new budget the Prime Minister has also announced that there are several new initiatives beyond what I have stated earlier, namely to return the Hawk Squadron aircraft to Labuan. We will also add one battalion in the near future in the East Coast. Apart from that, several other initiatives, namely forward basing and sea-basing, which we have already planned to implement with the assistance of Petronas. One of the features or characteristics of this forward basing is to set up a platform at sea, particularly in areas we consider hot spot areas, and we place it at the border using a platform provided by Petronas. It will be equipped with facilities not only for troops but we will also provide assets such as interceptor boats with a surveillance system. We will also provide helicopter services so that responses to these actions, violence or intrusions can be carried out more effectively. Apart from that, we have also provided mobile sea-basing, namely by providing the vessel KD Bunga Mas Lima at the border area, and it has been implemented. These are among the initiatives that will be added from time to time based on needs. This is because at the initial stage when we established ESSCOM, it was to deal with intrusions. However, it appears that what is happening now is more of trans-border crime or intrusions for the purpose of kidnapping, which is a security threat. Therefore, we have to take various steps to arrange the movement of our assets and also our battalion personnel so that they become a deterrent to parties who try to take advantage of a situation that appears open for them to commit crimes. Therefore, we work together with all parties, particularly with other agencies, so that we can always ensure our national borders are well guarded. Honourable Lumut also raised a good proposal, namely concerning price checks in the procurement of spare parts within the logistics organisation of the Army, TLDM and TUDM to prevent leakage. Indeed, Honourable Member, the government, particularly MinDef, does not want to compromise on issues relating to leakage. This is because we also want to see that what we do will provide value for money to the government.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Jasin, please stand.

Just a moment, Honourable Member. Within the ministry itself we have already set up an Integrity and Governance Committee. Some proposals of the Governance Committee, namely the Integrity Department, will be made a guideline to ensure that every procurement meets and complies with good governance. This is because we do not want it to have an impact on waste or undesirable corrupt activities. Please go ahead.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Jasin.

Thank you, Mr Chairman, thank you, Honourable Minister. The Minister mentioned ESSCOM just now. What is the form of the SOP for the military regarding any shooting action or shoot on sight against these intruders? Thank you.

Thank you, Honourable Member. Regarding this shoot on sight, I cannot answer it off the cuff; I will inform the Honourable Member later. This is because, as we are well aware, shoot on sight is indeed something I consider effective, but there are also other issues that we must consider. However, what I want to state here is that the role of the Malaysian Armed Forces is a complement to the services of PDRM and APMM, where PDRM and APMM are the personnel responsible for security matters. So if the threat is of a security nature, they are the ones who will handle it, because they have arresting power, whereas our army has no arresting power. Even if we make an arrest, we must hand it over to the police because our duties are different. Our duty is to protect the sovereignty of the nation, which is why in the ESSCOM structure itself we have placed a police officer as commander. This is because the jurisdiction relating to security is closer to the responsibilities of the police, APMM and also the Marine Police. However, if the situation is escalating and there is a need to do so, they will do it. Honourable Lumut has...

Mr Chairman, Minister.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, please, Honourable Sandakan.

Thank you, Mr Chairman. So, I want to know from the Minister, the Minister always argues that it is only defence. So, does the government have any intention or any steps to attack? We cannot always just wait here; the people who come in will later want to capture our people, then we go and look for them, pay ransom and so on. We must have a step to resolve this situation, which is so bad, especially in Sabah. Have we discussed with our counterpart, like the Philippine government, how we can eliminate a threat to us? We do not want to always just wait here. Every day they want to frighten our people, the situation is like this.

As the Honourable Member, I too want this matter to be resolved at least, because it will affect not only the security of the state of Sabah but also affect the economy in the long term. However, in matters of safeguarding the security and sovereignty of the nation, we must give full trust to our personnel. The policies carried out are certainly aimed at protecting us. What has been done so far has, to some extent, already shown results.

Not only were we able to kill the intruders during Ops Daulat in the past, but we were also able to curb kidnapping activities. New initiatives such as imposing curfew orders in certain areas have had a positive impact. I hope that we take a role, not just leave it 100 per cent to our security and defence personnel. All of us must be responsible because security is a shared responsibility. We must also ensure that all leaders at the village level, grassroots, are able to provide good intelligence information to security personnel. That is why in my own area, I have empowered all village heads and JKK chairmen to liaise directly with ESSCOM if they see any forms of threats that could affect our security.

Let me continue first. Honourable Lumut has— let me continue again. To ensure spare parts procurement is carried out according to government procedures, MinDef does conduct monitoring and auditing from time to time by the Audit and Investigation Division and the Inspectorate Branch to ensure that the prices of spare parts obtained are according to current and reasonable market prices. I want to state here to the Honourable Member that we will not tolerate any actions that could tarnish the good name or integrity, particularly under the Ministry of Defence. That is why, in every meeting or discussion, this matter is emphasised, particularly by my minister and also all ministry staff. Honourable Lumut also raised matters relating to maintenance projects, raising the issue of delays in completing maintenance projects carried out by companies appointed. As an example is the vessel NGV Tech. NGV Tech is a project that has encountered some problems, and I have received information that this project has now been liquidated. The party that requested the project to be liquidated was Maybank, and it has been handled with the stakeholders involved because it involves many stakeholders in this project, particularly Maybank. If it can be resolved in the near future, we will take appropriate action to ensure that MinDef's interests in this project are not compromised.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Minister, how much longer?

A little more.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, please, please.

6 o'clock. For example, the contract service life extension program for KD Kasturi and KD Lekir, where Boustead Naval Shipyard has been charged LAD amounting to RM42.9 million. So, we do not compromise with any of these delays. Whoever is involved in projects involving MinDef will be dealt with according to the rules and laws that have been established. The Honourable Member also proposed a special guest room at MinDef for contractors' business. For the Honourable Member's information, indeed a special guest room at MinDef on the lower floor has been provided, and a lounge area is also provided in the foyer on the lower floor. Both these places can be used for contractors' business with ministry officers to limit the movement of guests in the office. As I said earlier, the Governance and Integrity Committee will also advise the ministry on the need to take necessary steps to enhance integrity at ministry level. For the Honourable Member's information, this year we have once again been given a 5 star rating by the government, and this shows that the Ministry of Defence is well managed. The Honourable Member also raised the matter of the Armoured Car Squadron that travelled from Sungai Petani to Gemas during the month of Ramadan. For the Honourable Member's information, this training indeed involves officers and military personnel, regardless of whether it is in a regular month or the month of Ramadan. This is because, as we know, our military personnel must have a high level of readiness in any circumstances. This is because if a war occurs, it does not take into account whether it is during the month of Ramadan or not. What happened, for example the attacks that occurred in Gaza, shows that the attacks occurred during the month of Ramadan. Therefore, when they were given that task, they were responsible for conducting training at that time. So, the Honourable Member also raised matters relating to the CB90 that went missing for two days from Kota Kinabalu to Layang-layang.

For the Honourable Member's information, indeed at the time this incident occurred, the weather was in a very bad condition. In Sabah at that time there was very heavy rain and similarly very bad weather because there were also influences of typhoon winds from neighbouring countries. When the voyage was made, the CB90 was indeed capable of operating well and had been carefully inspected, but unfortunately, due to the weather conditions and the very high waves at that time, they lost contact with KD Paus, which had escorted the CB90. The CB90 is indeed commonly used in reef operations because they need this boat in operational areas, whether operations at Layang-layang Reef, Peninjau Reef and also Ubi Reef, because it can be used to intercept if there are elements of intrusion into our territory. Regarding the use of the transport vessel that was proposed by the Honourable Member, it is a good proposal but it is not very economical because this transport vessel must be chartered at a fairly high transport cost and because the size of the boat is also fairly large. The Honourable Member also raised matters relating to efforts to improve the infrastructure of camps that have become outdated in several areas. For the Honourable Member's information, from 2011 to 2016, the government indeed planned 9 Army Care Projects, of which two projects have been completed and seven projects are under construction. The completed projects are in Miri, Sarawak and Senawang, Negeri Sembilan. Meanwhile, the projects under implementation are at Seberang Takir Terengganu, Lok Kawi, Sabah, Sandakan, Sabah, Mentakab, Pahang, Sibu, Sarawak, Oran, Perlis and Jeli, Kelantan. The total amount for these Army Care Projects is RM459,750,777, and the government will continue the projects under the Army Care Program subject to the allocations approved by the government. The Honourable Member also proposed giving a reward of RM100,000 to personnel involved in Operasi Fajar. Indeed, MinDef will study the justification of this. This is a proposal, but it depends on the government's decision and capacity. Finally, we must ask the Ministry of Finance whether it will be approved or not, which is something we must consider. However, as I have often stated, these military personnel have duties in sensitive places. This is something we must appreciate. Indeed, if salaries are calculated, they are not very reasonable, but because of their dedication to defending the interests of the nation, whether inside or outside the country, they are always ready to serve wherever it may be.

So we must give praise to them. For example, I have visited several sensitive areas such as Layang-layang Reef, Ubi Reef, Peninjau Reef and also Pulau Perak. I personally saw their condition, and it is a fairly sensitive area, and the incentive payment given is also not that much, namely paid at only about RM8 a day. Nevertheless, this incentive payment needs to be studied, and I also ask that perhaps this matter can be considered by the Ministry of Finance, but this exercise must involve a comprehensive exercise. The Honourable Member also raised matters relating to other ranks personnel, so that their duties are not burdened based on the multi skilling method practised. For the Honourable Member's information, the multi skilling referred to is the value addition of skills for a personnel so that they can carry out their duties more perfectly and successfully. When they obtain this multi skilling, they are also paid salaries in a higher band, namely Band 4 and Band 5, and in addition it can also improve the efficiency and quality of personnel skills towards accreditation of academic qualifications at diploma and degree level thereafter. Nevertheless, for the purpose of job assignments, LLP personnel only carry out specific tasks in one area of expertise as a whole. The Honourable Member also proposed an Al-Hafiz allowance for KAGAT personnel.

For the information of the Honourable Member, the Malaysian Armed Forces (ATM) has indeed considered the merits of this proposal to create an Al-Hafiz allowance for the 19 existing KAGAT personnel. However, this is because the proposed Al-Hafiz does not yet exist in the public service. Nevertheless, with effect from 1 January 2013, the Kagat Service Scheme under the FZ Scheme has been upgraded to the ATM Service Scheme 2013, which provides salary increases under the ZA Scheme or various entry qualifications. The Honourable Member also proposed that non-pensioned veterans be given a one-off payment, which I have already answered earlier. The Honourable Member also raised matters relating to pensions earlier. The Honourable Member also raised the request for the ministry to coordinate differences in rates. I have already answered this a short while ago. The Honourable Member for Labuan raised the issue of the Hawks Squadron returning to Labuan. This is an initiative for reinforcement of forces in Sabah and Sarawak. Of course, it will have a good security impact, and its economic impact will also bring some benefit to Labuan, because Labuan will not only gain additional personnel there but will also provide assurance to investors, particularly in oil and gas, which is centred in Labuan. The Honourable Member raised the matter of commercial maintenance, the maintenance of Royal Malaysian Navy (TLDM) vessels at Labuan Shipyard. We will take note of this matter, and the Honourable Member may submit it to us for consideration. The Honourable Member also raised the need to establish an army presence in Labuan. At one time, the army was stationed in Labuan but was later moved elsewhere. However, to protect those assets, we have already provided a military police presence there, but we will also take note of the Honourable Member's views. I will bring this matter to the attention of the Malaysian Army (TDM) so that it can consider whether there is a need to provide at least one battalion in Labuan, particularly within the army forces. The Honourable Member also raised matters relating to the Allied Forces Memorial Park. There is indeed a memorial park in Labuan involving the Allied Forces that took part in World War II, and it is visited by all the countries involved. In the future, we may also wish to be part of the initiatives undertaken to promote this site. The Honourable Member for Setiawangsa, I have already answered earlier. The Honourable Member for Kepong, I have already answered. Okay, the Honourable Member for Kluang raised the matter of national defence policy. Indeed, I have also already answered this earlier, that we are already in the fourth dimension of the Malaysian Armed Forces, that the threats occurring today are different from those of the past. We are constantly making transformations or improvements by looking at the forms of threats that exist. So I think that is all; I have answered most of the questions raised. If there are matters I have not answered, I may answer them in writing. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Members, the question is that the sum of RM14,144,796,800 for Purpose B.60 under the Ministry of Defence, forming part of the Schedule, be agreed to. [Question put, and agreed to.] [The sum of RM14,144,796,800 for Purpose B.60 ordered to form part of the Schedule.]

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The question is that the expenditure of RM3,618,221,600 for Purpose P.60, as stated in the Development Estimates for 2015, be approved. [Question put, and agreed to.]

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

[The sum of RM3,618,221,600 for Purpose P.60 approved to form part of the Development Estimates 2015.]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 Committee — Clause B.29 [Schedule] - Clause P.29 [Development Estimates 2015] -Bill

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Ministry of Energy, Green Technology and Water. Supply Heads B.29 and Development Heads P.29 under the Ministry of Energy, Green Technology and Water are open for debate. The Honourable Member for Simpang Renggam.

Tuan Liang Teck MengGERAKAN · BNSimpang RenggamEN

Thank you, Mr Chairman. I wish to raise just one matter, under Item 06400 – Johor State Water Supply Scheme. Mr Chairman, I would like to draw the ministry's attention to the water supply problem that has occurred for years in my constituency, particularly in Renggam and Layang-layang. The problem is the water supply disruption that occurs during periods of high water demand, such as during the Chinese New Year or Hari Raya festive seasons, when many people working outside the Simpang Renggam area return to their villages. In fact, I wrote a letter to SPAN earlier this year, and I would like to quote and read the feedback from SPAN, which reads as follows: "As stated in the Honourable Member's letter, the water supply disruption in Pekan Layang-layang is caused by a reduction in water output from the Sembrong Barat Water Treatment Plant. Because Pekan Layang-layang is located at the end of the water supply system, water supply disruptions will occur particularly during periods of high water demand if the plant's output is less than 60 million litres per day. As the Honourable Member is aware, the Sembrong Barat Water Treatment Plant is operated by Southern Water Corporation (SWC) under a concession agreement that will expire in June 2014. As part of the handover process, the Johor State Government has appointed consultants to carry out a study to ensure how output can be increased up to the design capacity. If output can be increased to the original design of 80 million litres per day, the plant will be able to supply sufficient water for the residents of Layang-layang, especially during the festive seasons and at times of high water demand."

Tuan Liang Teck MengGERAKAN · BNSimpang RenggamEN

SPAN understands that SAJ will send tanker lorry assistance to consumers each time a water supply disruption occurs in the Layang Layang area. Accordingly, SPAN will monitor this matter and cooperate with SAJH to minimise the difficulties faced by the residents of Layang Layang. Because the state of Johor is among the states that have moved to the financing regime of Pengurusan Aset Air Berhad (PAAB), SAJH has been and will continue to receive PAAB financing to carry out CAPEX works, including upgrading works for the water treatment plants under their operation. SPAN will properly consider SAJH's applications in providing adequate water supply infrastructure in the state of Johor generally and the Kluang district in particular. Mr Chairman, I understand that in June this month, SAJH has already taken over from Southern Water Corporation. This means SAJH is now not only a distributor but also a producer of treated water. I would also like to know the current status and what plans exist to upgrade the capacity of the water treatment plant from 60 million litres per day to 80 million litres per day. I request a reply from the ministry. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Petaling Jaya Utara.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Thank you, Mr Chairman. I only want to raise the issue of Item 010200, energy administration issues. Recently we have all come to know that 1MDB has focused its attention on the energy industry, where in 2012 and 2013, 1MDB took over several independent power producer (IPP) companies in the market, including Tanjong Energy for RM8.5 million, Genting Sanyen for RM2.3 billion, and also Gima Energy. Because 1MDB did not have sufficient capital, it sought or obtained very large loans to finance all its acquisition work. This includes overseas loans by 1MDB Energy of RM5 billion and 1MDB Energy (Langat) of RM5.1 billion. Powertech Investment Holding, local loans of RM1.67 billion, and also 1MDB Energy (Langat), local loans of RM607 million. All these loans total more than RM17 billion. There may be even more loans that have been granted, including RM800 million in loans guaranteed by the government. RM800 million had a government guarantee, that is not wrong, which was used to take over local companies in this industry. This has resulted in a situation where the government's previous policies in the energy sector, particularly the administration of independent power producers, were modified to assist 1MDB. First, the concessions that have been taken over by 1MDB, such as Tanjong Energy and Genting Sanyen, have very short remaining tenures, which are about to expire. They paid a high cost, therefore the ministry was forced to extend these concessions, although in principle this extension should have required a fresh open tender. That is the first point. Second, in recent two or three years there has been an improvement from the ministry's side following the establishment of the Energy Commission in our country. This is a good thing. The improvement is in what way? There are open tenders. There are open tenders so that all independent power producers wishing to take part in the energy sector in Malaysia must tender openly, submit bids to obtain contracts or concessions from the government. This is a good thing because it can lower the tariffs charged to Tenaga Nasional Berhad, which in turn lowers the tariffs charged to the people of Malaysia. The problem is, when it came to the tender for Project 3B, 1MDB intervened. This is not RM3 billion, this is 3B. Project 3B is a coal-fired power plant worth approximately RM11 billion. The tariff offered by 1MDB was 25.65 sen per kilowatt hour. The bid submitted by YTL was 25.23 sen per kilowatt hour. Clearly, the bid from the YTL Consortium was lower than the bid from 1MDB. However, the contract was awarded to 1MDB. The problem is, when it was asked why a higher price was given the contract, the ministry said YTL was not qualified, that it had been disqualified on the technology used. However, this was not told to YTL before the decision was made or before bids were submitted. In The Edge newspaper it was clearly published that YTL had negotiated with the ministry before its bid was submitted, asking whether this technology would be used and whether it would be acceptable. The reply from the ministry's technical committee was yes, it could be accepted. However, after using this technology to achieve a lower tariff, now the ministry says no, cannot, cannot use it. This is despite the recommendation of the ministry's own technical committee that YTL was the best proposal to be offered for Project 3B. So, as a result, although 1MDB offered a higher tariff, it obtained the contract to supply energy to Tenaga Nasional Berhad in this project at a higher tariff. That is not enough. 1MDB, because of its very large debt, not only large debt, the interest charged is very high, commission fees and expenditure used by the government side, record high, the highest in the world. I have mentioned this before. No need to say it again.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Because of the very high burden on 1MDB, even though the concession period has been extended, even though an open tender contract was offered to the 1MDB company, even though its price is not the lowest, this RM11 billion tender is not enough. Not enough how, must we hold another open tender? It seems the ministry's mind has changed. Don't waste time holding another open tender, let's go straight to direct negotiation. The first direct negotiation was a slightly smaller contract, a 50 megawatt solar power plant. Solar energy, solar power, 50 watts in Kedah. There was a question raised by my colleague, the Honourable Member from Serdang. The Honourable Member for Serdang is not here, but I have his question. He asked the Honourable Minister why the 50 megawatt solar farm project was given to 1MDB through direct negotiation, given that there are many other Malaysian companies with a better track record than 1MDB in building and managing solar farms. Honourable Members, the answer given by the Honourable Minister's office was as follows.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

The 50 megawatt solar power plant project given to 1MDB through direct negotiation is a pilot project that will serve as a benchmark for assessing the effectiveness of building large-capacity solar power plants. However, awarding this directly must also comply with existing regulations, where the government's interests are protected based on certain stipulated conditions. But what is important is that the effectiveness of this pilot project will be a starting point that opens opportunities for other solar power producers to compete in the open tender process to be carried out later. So, the answer given by the Honourable Minister's office is that we hold direct negotiations first so that an open tender can be carried out. Not very reasonable. If we want to do a pilot project, we should ask for proposals from all parties with experience, give the best proposal, and the ministry chooses the best. Why in this matter did the ministry decide on direct negotiation? Not only that, this has also contradicted the government's previous policy of establishing the Sustainable Energy Development Authority (SEDA) to protect and stimulate the renewable energy industry. They have been sidelined. They were given quotas to allocate to companies of 10 megawatts, 20 megawatts, but when 1MDB came, everything done previously was of no use. Just give 50 megawatts straight away. But 50 megawatts is too small, not enough. The profit is still not large enough. Then in August recently, a new offer was given to the 1MDB company. Another power plant of 2,000 megawatts located in Melaka was offered through direct negotiation to 1MDB. What I find a little strange is, what's the urgency? Why the rush? Because the project located in Melaka is actually only needed in 2021. This is according to the ministry's own master plan. This plant is only needed in 2021. Why the rush now to offer it through direct negotiation to 1MDB? I asked the Honourable Minister, and the Honourable Minister replied. In the Honourable Minister's reply, the Honourable Minister said it had to be done because 1MDB has sufficient expertise. It is not only 1MDB that has expertise, other companies do too. I asked again, what tariff will be charged? If there is direct negotiation there must be a tariff that has already been fixed. The Honourable Minister said the tariff has not been fixed. The way the ministry is doing it now, offer the contract first, we will discuss the tariff later. Who will lose? The people will lose, because whatever tariff is discussed after the contract is offered will certainly benefit 1MDB...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Petaling Jaya Utara.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya Utara

Cepatnya.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

11 minit.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Oh! 11 minutes. Not 15 minutes.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

10 minit.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Not 15 minutes.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Bukan.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Sorry, I will try to finish quickly.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Sila, sila.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Okay, and now, okay, I will finish. Now not only has the contract for 2,000 megawatts in Melaka already been offered, but news has just come out that, at the end of September or early October, two power generation plants will be given to 1MDB in Sabah. One, a 4,000 megawatt gas turbine in Lahad Datu or Sandakan. The other, a 780 megawatt hydro system in Ulu Padas, has already been offered through direct negotiation. Was there negotiation or no negotiation? I don't know, but it has already been offered to 1MDB. I would also like to quote a media statement from SESB, Sabah Electric, in the Malaysian Reserve, which directly denies that they knew nothing at all about the participation, the participation of the energy industry by 1MDB in Sabah. SESB unaware of 1MDB plan in Sabah power sector. Sabah companies also seem to have been sidelined in their interests. So, I ask that the government answer why 1MDB is given such excellent privileges. Privileged access, direct negotiation, straight contract. The tariff does not even need to be discussed anymore. The agreement with our energy [sector] will be made later; we give the contract first. These are the two most important things. Number one, to help 1MDB's IPO, because if 1MDB MLG does not IPO, is not listed on Bursa Malaysia to raise the money reported, about RM10 billion, they may go bankrupt, become insolvent, because they do not have enough money to pay their debts. They urgently need this RM10 billion, and the government is trying as much as possible, without handing cash directly to 1MDB, to give lucrative contracts to 1MDB to save the company. Number two, to show that 1MDB is still viable, still has excessive profits. When 1MDB takes over these independent power producers, there is a high premium, and if these companies cannot, 1MDB cannot show profits in the future, this premium must be written off. If this premium is billions of ringgit, RM2 billion to RM3 billion, and must be written off, it will be shown in 1MDB's financial statements that a huge loss has occurred. So, to avoid 1MDB having to write off this premium, contracts must be given hastily to 1MDB so that when the financial statements come out, the loss is only RM675 million. Not more than RM1 billion even. Is this the government's new policy in the energy sector? What was good before has been lost. All the improvements that we achieved and were very happy about are gone. Now we have turned back to the era when all IPP contracts were lucratively given to certain parties through direct negotiation. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Parit Sulong.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Honourable Mr Chairman. I would like to go straight to Item 050200, Malaysian Green Technology Corporation. I support the government's aspiration to make Malaysia a green technology hub by 2020 and then to make the community, and subsequently the community, a green community or green community by 2030. In this regard, I have learnt that GreenTech Malaysia targets 50 approved green technology projects with an investment value reaching RM1 billion this year. Therefore, my question to the ministry is, so far, how effective is the GreenTech centre in promoting green technology in our country? Next, have the programmes implemented by GreenTech Corporation been carried out in an effort to achieve the targets set earlier?

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Then, how does GreenTech Corporation involve the private sector so that they will take a more active initiative to participate in all the programmes planned by this GreenTech Corporation? And so far, what are the latest developments of the Green Malaysia Plan 2030, which is the flagship project of GreenTech Corporation? For this item, my last question is what efforts have been made to involve the public in making the Green Malaysia Plan programmes a success, considering that the participation of the public, as we know and believe, is very important to work together in making any programme organised by the ministry and also the government a success.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Next, Mr Chairman, I move on to Item 060100 – International GreenTech & Eco Products Exhibition & Conference Malaysia 2015 (IGEM 2015). I would like to congratulate the organisers of IGEM recently, which was attended by 600 participants from various sectors, presenting leading green technology experts from across the country to share their research, views and contributions to drive the growth of the country's green industry in October last year. I have several questions on this matter. My question is what efforts have been made by the ministry to foster cooperation between Malaysia and foreign countries, especially internationally, to promote the use of these green and environmentally friendly products? I also ask the ministry to inform us what is the rate of participation of local entrepreneurs in this exhibition? This is because there were 600 participants just now, so of this number, what is the total participation of local entrepreneurs, and what kind of assistance can be given to these local companies in an effort to encourage them to participate in such international conventions or exhibitions if it is held again? Also, I would like the ministry to state what are the main focus sectors of IGEM? Does it intend to further expand the focus of these fields? Also, what steps have been taken by the ministry to make the products displayed at this exhibition commercialised, not just mere exhibits? So they can become products that are truly useful for human life. Next, my last item is Item 060200, which is MyHIJAU. The question is short, just one. I only want to know what criteria have been set by the ministry as a condition of eligibility for any company to use the MyHIJAU logo? That is all, Mr Chairman. Thank you very much.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Selayang.

Tuan William Leong Jee KeenPKR · PHSelayangEN

Thank you, Mr Chairman. The first point is Item 010300 – Green Technology and Water and Item 050200 – Malaysian Green Technology Corporation. My question is that the government has long encouraged green technology and green building construction, but until today, we see that not many green buildings have been built. My view is that there is less demand from buyers and the public, and that is why developers, architects, suppliers, consultants and so on do not build green buildings. The reason is due to a lack of awareness and education among the public about the benefits and importance of green technology in protecting our environment. My question is, what are the plans by the government and the ministry to raise awareness? The second point is Item 050300 – Electricity Bill Subsidy and Item 03202 – Transmission and Distribution (Energy).

Tuan William Leong Jee KeenPKR · PHSelayangEN

First, I agree with what Honourable Petaling Jaya Utara said about 1MDB and the extension of PPAs to two companies, namely Tanjong and also Genting. My question is, what is actually the capacity needed by TNB for our country? This is because at first, when IPPs were made 15 years ago as a temporary step to give TNB the opportunity to build plants to generate electricity, but today we see that the PPAs have been extended. Second, why use first-generation IPPs with old technology when the government itself announced in the RMKe-10 that the country would build plants that, with permission, are said to be cost efficient and sustainable? If so, why are we using IPPs with old technology? My third question is, will the government set the price of natural gas that Petronas will sell to Tanjong, Genting, 1MDB and so on? This is because this is a special price. Previously the selling price was RM6.40 for market prices, and for the non-power sector it was RM11.32. From 1997 until 31 December 2013, the profits foregone by Petronas due to the special price given to IPPs totalled RM199.9 billion. If the government sets Petronas to sell natural gas to IPPs, especially to 1MDB, which we know will be listed and Goldman Sachs will sell shares to the whole world, that means foreigners will benefit from this. My question is, why are we giving this benefit to foreigners? I now move to Item 06400 to Item 11600. This is water supply to all states. Up to today, we know that NRW is 36.6 per cent. The amount of water lost per day is 5.69 billion. So it is more than 53 days' worth of water for the whole of Perlis that is lost in one day. We know that the government had given the former SYABAS concession to replace and substitute the old pipes made of asbestos cement, but this could not be done. Today we know that with an agreement to buy the concession, I would like to ask the ministry to provide an explanation: how many pipes have been replaced by SYABAS in Selangor? This is because the government had given soft loans to SYABAS to do it, and we know this was not done, and today Selangor wants to buy back the concession from SYABAS at such a high price, but we see that the NRW problem has not been overcome. This also applies across the whole country; the amount expected to replace all these old pipes is RM20 billion. Indeed, state governments are unable to do so, all states in Malaysia. If we do not overcome it, and if the government is indeed going to build several new plants such as Loji Rawatan Langat 2, this will be wasteful if we do not overcome the NRW. Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Jelebu.

Thank you, Mr Chairman. I also wish to take part in debating Purpose B.29 under Item 07800, namely the Negeri Sembilan Water Supply Plan, specifically the Triang Water Supply Scheme Project. So, the Triang Water Supply Scheme has been launched or planned since 2004, and in 2009 its Minister at the time, Dato' Peter, stated that the Triang Water Supply Project would be completed and operational in 2010 and 2012. Unfortunately, until now the project is still not completed. In October 2013, I raised a question on the status of this matter in the same House. The Minister stated that the project, which was 98 per cent complete at that time, would be fully completed by the end of 2013, that was the expectation. So, I want certainty on the status of this project: has it been fully completed and is it operational? This is because the Triang Water Project is important to Negeri Sembilan, especially for the supply of clean water in the areas of Seremban, Nilai and Rasah.

So, the raw water to be brought from the Triang Dam programme is taken to the centre or water treatment plant at Ngoi-Ngoi near Seremban to be processed as treated water, and it can supply more than 500 million litres of water per day. Therefore it is very important to Negeri Sembilan to ensure a clean and sufficient water supply at all times. My question to the ministry is, when will the Triang Water Project be fully completed and when will it begin operating? I know it is almost completed in its entirety, but when will it operate, that is my question to the ministry. What is the total cost of the Triang Dam water project? Next, I would like to ask the ministry for an explanation as well. When the Triang Dam water project is completed, what will be the status of these assets? Will they be handed over to the state government, namely Syarikat Air Negeri Sembilan (SAINS), or will they be administered directly by the ministry or the Federal Government? If these assets are handed over to SAINS or the Negeri Sembilan Government, that is, if water is managed by Syarikat Air Negeri Sembilan, will it be a form of grant, or will it be a financing and loan from the state government to the Federal Government? So these are two or three points on which I request further explanation from this ministry. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Parit Buntar.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Thank you. Mr Chairman, I have only two items on which I would like to get an explanation, namely under Item 050200 under the heading Special Programmes. I would like to get information from the Malaysian Green Technology Corporation's perspective: to what extent is the human capital development policy related to green technology? What I mean is, to what extent are universities, together with the Ministry of Education, providing space for students to pursue studies in the field of green technology? This is because we are concerned that when the Green Technology Policy is fully implemented, there may be a shortage of manpower in terms of human capital that should include human resources, and the Ministry of Education, taking into account how to meet this human capital need in terms of academics and also the production of students who are skilled in this field. This also includes the current level, namely those whom we can upgrade according to the suitability of green technology needs, so that the gap in providing complete human capital development today needs to be improved. I want to know to what extent the programmes for training to build knowledge about green technology are. This also includes research. How about research, and this may also be linked to the private sector helping the research field, because we know green technology is fundamentally a research field, as there are still many areas that need to be explored according to the environment, needs and capacity that we have. As my other colleagues also touched on the level of awareness, I would like to request an explanation of the extent to which the ministry has a form of standard benchmarks, stating that if by 2030 we want Malaysia to be a totally green country, what is the benchmark from today for us to state that we are moving towards that goal? I have not yet received an explanation from where I read or searched for, the benchmarks showing that overseas there are standards that we must achieve from now until the target year. Likewise, I and my other colleagues also support the development of green technology, which is environmentally friendly. However, my question that I asked the Minister is, to what extent has this implementation been carried out at government level first? What percentage is actually implementing not just green buildings but also in terms of work culture, is it also an environmentally friendly work culture? Then Item 06000 under the heading One-off. I also, like Honourable Parit Sulong, under 060100 – International Green Technology & Eco Products Exhibition & Conference Malaysia 2015 (IGEM 2015).

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

I would like to get an overview as well: in the exhibition, what is the value of industry transactions in terms of its achievements? That is one. Second, how is the public's response to this exhibition, apart from industry? Finally, Mr Chairman, I would like to touch on Item 060200, namely the state-level programme of the Green Technology and Climate Change Council (MTHPI). There is a conflict that is repeatedly raised. Although at the Federal level we have a clear policy, to what extent can state-level authority balance the needs of these Green Technology Policy requirements at state level? This also includes issues such as illegal logging, for example. This also involves the issue that I touched on regarding the floods in Cameron Highlands. This is because we see the conflict in terms of who will grant approval for projects in these places at state level. Then at the level of the district councils.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Now, when we talk about dealing with climate change, climate change today, the world has changed to no longer rejecting climate change but adapting to climate change, because we cannot escape from climate change. However, if these policies do not address the reality of this situation, then this is where we see the inconsistency between what the Federal wants and what the state wants. So, I ask for an explanation: to what extent has the effectiveness of the Green Technology and Climate Change Council at state level achieved an approach first, what we agreed on, and to what extent has implementation been carried out? One of the biggest problems is enforcement, which is still weak at state and also district level. With that, I thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Bagan Serai.

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Mr Chairman. I refer to Head 050000 – Special Programmes, Item 050300 – Electricity Bill Subsidy. Electricity is a basic necessity; everyone needs electricity, yes. Rich, poor, old, young, of whatever race. I cannot imagine what it would be like without electricity. What would happen to our schools, and how would people pray at the mosque? What about hospitals? And in our own homes, what would the situation be without electricity, to the extent that many houses today sleep every day with air-conditioning? If there were no electricity, how could people sleep, to that extent? So, regarding this electricity tariff, we saw an increase in electricity prices earlier in the year due to the rise in fuel prices. 85 per cent of the cost of generating electricity is actually the cost of fuel such as diesel and imported coal, whose prices have gone up. The provision of electricity causes maintenance costs to keep rising higher and higher. For example, there must be maintenance of new cables, and also of cables that are stolen, and cables are also damaged when disasters occur such as floods, fires, road accidents and so on. TNB needs to build many new transformers and new distribution stations and build new power generation because industry is now growing, housing is increasing, and consumption is increasing. So, we thank the government very much for continuing to provide this rebate. I see that this electricity subsidy, which provides a rebate of RM20, means that bills below RM20 do not need to be paid. This has been in place since 2010. However, I look here, and I do not really understand here; the estimate for 2014 is absent. The estimate for 2015 is RM150 million. So, I would like to get an explanation here as well. This rebate is said to be given until 31 December, 2014. So, what happens after this? What happens after this? Will it be stopped, reduced, or why is it not increased?

Dr. Haji Noor Azmi bin GhazaliUMNO · BNBagan SeraiEN

Or why is it not increased, because next year there will be changes and new shocks, such as the GST and so on. So, Mr Chairman, I also want to know how many people actually use current of RM20 and below? Or are there only empty houses at RM20 and below? Now, in the present situation. So, how many people in this country use RM20 and below? How large is the total rebate? The total rebate that has been given. For example, last year, from 2010 until now. What are the determining factors for increasing, reducing or stopping the rebate being given? This is because we already know. As I mentioned earlier, electricity is a basic necessity, and an increase in electricity will shock the entire population. So, I hope the government will be more considerate and continue its good efforts in giving rebates to the people. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Sandakan.

Thank you, Mr Chairman. I wish to refer to Head P.29 under Item 03200 – Sabah Electricity Sdn. Bhd. (SESB). Mr Chairman, in the Tenth Malaysia Plan (RMKe-10) from 2011 to 2015, the government approved an estimated allocation of RM2.4 billion to SESB under the same item. However, reading this budget is very disappointing. From 2011 to 2013, the allocation given to SESB was RM67 million. In 2014, RM113 million was allocated. In Budget 2015, the government will allocate RM111 million to SESB. Overall, although the government's target was RM2.4 billion, in the end not even RM300 million was allocated. I want to know why the RM2.4 billion approved in the Tenth Malaysia Plan was not fully utilised. According to the government's KPIs, should not all allocations that have been planned be fully utilised? It is clear that in RMKe-10, the allocation given to SESB was used to no more than 15 per cent of that RM2.4 billion. This shows that the government's administration, which is so inefficient and ineffective, has completely disappointed all the people of Sabah. I would like to know why this happened. Has this plan been stopped or cancelled? I hope this is not one of the proofs showing that the Federal Government has neglected the development of the state of Sabah. Mr Chairman, in this context, while Sabah is experiencing an increase in electricity tariffs, it seems that Tenaga Nasional Berhad (TNB) is not providing assistance, and now the Federal Government has also failed to allocate what was planned in the Tenth Malaysia Plan. This has oppressed the people of Sabah, and, no wonder, with respect, Sabah is so poor, and my constituency of Sandakan still faces electricity disruptions every day. I hope these questions will be given a detailed explanation. Mr Chairman, regarding SESB, I feel very disappointed, while the people of Sabah constantly experience electricity disruptions. Now, the performance of electricity supply to consumers is very unsatisfactory. Unfortunately, too, according to this budget book, the number of electricity interruptions, or citing, in Sabah has increased from 423 minutes per consumer in 2013 to 700 minutes in 2014. Yet SESB still raised electricity tariffs by as much as 16.9 per cent in January 2014. This means that it is the highest tariff increase compared with the whole country. This is totally unreasonable. Let us not forget that Sabah is an oil-producing state, so rich in natural resources, which has contributed subsidies to the IPPs. Yet now we are experiencing this hardship. This is truly a laughing-stock in the whole world, given SESB's terrible performance. SESB still has the face to ask for an increase in electricity tariffs in Sabah.

This not only angers the people of Sabah, but is also robbery in Sabah. In addition, I have received complaints that SESB has started collecting excessive deposits in Sabah. According to complaints, not only has this definition been raised, but it is still increasing and requiring even more deposits. This certainly worries the people of Sabah. The problem is, why collect this deposit repeatedly? If consumers do not pay their SESB bills, surely the company will cut off the service? However, I was surprised, according to the answer of the Honourable Minister, that one of the factors for the inadequate electricity supply in Sabah is electricity theft. Most cases involve the PTI group. Because PTI do not have valid documents, SESB said it cannot take action. I certainly do not agree, and I hope SESB will establish a rule to deal with this problem. Mr Chairman, SESB is a subsidiary under TNB, which holds 80 per cent of the shares, and TNB, having recorded huge profits, should have a responsibility towards SESB to help it in all aspects. According to TNB's Financial Report, in 2010, TNB recorded a profit of RM3 billion, and this profit has continued from 2011, 2012, 2013 until 2014. Most recently, in 2013, TNB recorded a profit of RM4.6 billion, while in 2014 TNB is expected to record a profit of RM6.1 billion. This happened after the tariff increase earlier this year. Despite the huge profits every year, the government still tells TNB to raise tariffs to burden the people. This is totally unacceptable, and I regard the Barisan Nasional Government, this slogan must be changed to: the people are burdened, cronies are prioritised. I wish to stress here that TNB is not...

Honourable Member for Sandakan, may you give way a little, Honourable Member for Sandakan. Just a brief interruption.

I have no time, sorry, yes. I wish to stress here that TNB is not a private company like any other. It is a company with a natural monopoly and it is burdensome. One, it is the most basic necessity for all the people. It has a social responsibility. Basic facilities such as...

Honourable Member for Sandakan, that is what I meant earlier. I almost agree with the Honourable Member for Sandakan just now.

Yes, you just agree, we can talk about it later. Basic facilities such as electricity supply are the duty of the government, even though TNB does not make a profit, it must supply basic facilities to the people. Now, TNB has obtained such huge profits, yet still wants to raise electricity tariffs. This is totally irresponsible and immoral. If TNB is unable to manage SESB and cannot help the people of Sabah, I propose here that the management rights of SESB be returned to Sabah. Mr Chairman, I would also like to touch a little on 1MDB. Earlier... [Interjection] Be patient. My colleague, the Honourable Member for Petaling Jaya Utara, has already touched on it in great detail, but here two units proposed to be built in Sabah. Here, we hope the government and the relevant Minister do not agree that this highly scandalous company should be taken over in Sabah to build this plant. We hope that these two plants cannot be implemented by open tender, and that priority is given to local Sabah contractors. This is what we hope, and apart from that I would like to know whether the plant to generate hydroelectric power is so large? This will take over the land involved, NCR land or village land in Sabah. This too we must study carefully. Another thing, we hope the government must ensure that the EIA study complies with these conditions. So, I hope all these will be done. Mr Chairman, before I end, I want to question the construction of the Tawau Geothermal Power Plant, which has attracted criticism because logging activities were found taking place at the site.

The Honourable Member for Kalabakan once raised the issue of illegal logging in Tawau, but there were lorries after lorries of timber removed from the first-class permanent forest reserve, that's all. Since last year, the timber was supposedly the result of clearing the site for the Geothermal and Green Energy (TGE) plant project. According to the latest estimate disclosed by the government, a total of 429 hectares of forest was felled for the construction of the plant. For the information of this honourable House, the Director of the Sabah Forestry Department, Datuk Sam Mannan, previously claimed that logging was carried out to clear the area for building roads. However, as much as 80 per cent of road construction was completed by August 2013. According to the official website of Green Energy, why is there still so much timber found on the Tawau roads? What is most interesting is that, based on the Companies Commission of Malaysia (SSM), it was found that the majority shareholder in Green Energy is the Chief of UMNO Youth for the Sipitang Division, Yamani Hafez…

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Sandakan.

...That is, the son of the Chief Minister of Sabah at the time the company was established, which was granted the power of renewable energy is very...

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

That's enough, Honourable Member.

Just a little more. It is very clear that this company has no experience in operating in the power sector. Is it indeed related to illegal logging under the pretext of constructing a power plant? Therefore, not only must the Malaysian Anti-Corruption Commission (SPRM) investigate this matter, I also demand that now is the time for the Federal Minister to intervene. The Honourable Minister of Green Technology, Energy and Water must explain to the people what the status of the project's development is. Is the project viable to carry out? All excessive logging from the construction site must be stopped immediately, and if the company concerned is guilty, we must bring them to justice. I do hope that the Tawau Geothermal Power Plant can be built in Tawau and in Sabah, my home, but I oppose any rampant logging that uses site construction as an excuse. With that, I thank you. End.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Tanjong Karang.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

Thank you, Mr Chairman, for allowing me to take part in this debate. I wish to touch on Item 09100 – Selangor State Water Supply Scheme. I would like to ask for an explanation from the ministry, there are two issues: first, the restructuring of water in Selangor, and second, the construction of Langat 2 Plant. First, regarding the restructuring of water in Selangor, I want to get an explanation on whether the agreement has been signed between the concessionaires and the Selangor State Government.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

If I am not mistaken, there are four concession companies supplying water in Selangor, and one of them I have forgotten, SPLASH perhaps. I want to ask, have all four of these companies agreed to sign the agreement? What is the difference between the agreement that was signed by the former Menteri Besar of Selangor, Tan Sri Khalid Ibrahim, before he was removed as Menteri Besar? An agreement has been made, is that agreement valid or not? Valid or not?

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

I want to ask, when the new Menteri Besar, the Honourable Member for Gombak, the Menteri Besar, was appointed, was a new agreement signed? If this new Menteri Besar has made a new agreement, are its terms different from the terms of the agreement signed by the former Menteri Besar? I follow these developments and understand that the Member of Parliament for Gombak, who is the Menteri Besar, has also requested that the ministry disclose the terms of this agreement, and whether the ministry has agreed to the proposal from the Menteri Besar of Selangor? If the ministry says it does not agree, why? If this agreement was signed, I do not know. So, has this second agreement been signed, in which the ministry has agreed to the wishes of this Menteri Besar of Selangor that the terms of this agreement be disclosed to the public? So, if the ministry does not disclose this agreement, how can the new Menteri Besar sign with the ministry? This is because we are well aware that one of the reasons why the former Menteri Besar of Selangor was removed was the water issue. This is because the opposition parties, the PKR in particular in the state of Selangor, did not agree with the agreement that had been signed, and moreover, in the last sitting of the Selangor State Legislative Assembly (DUN Selangor), a motion was tabled in the Selangor State Legislative Assembly, I believe by the State Assemblyman (ADUN) for Kampung Tunku, urging the state government to reject and review the terms of the water agreement and water rationing that had been made by this former Menteri Besar. So my question is, has a new agreement been made with the new Menteri Besar, and have these terms been changed? If a new agreement has been made with the new Menteri Besar without any disclosure to the public, without changing the terms of the agreement, it clearly shows that the Pakatan Rakyat in the state of Selangor is just playing politics, just looking for an excuse to reject the former old Menteri Besar...

[Dewan riuh]

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

If you are not sure, do not accuse Pakatan Rakyat. Sure or not, sure or not?

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

I am asking. Honourable Member, wait. I am asking the Minister...

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

If you are not sure, do not blame Pakatan Rakyat, PKR.

Honourable Member for Tanjong Karang...

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

This is the opposition. I am asking the Minister, let the Minister answer. If the Minister says not yet, then not yet. If the Minister says yes, I challenge the Honourable Member to resign, can you? I want to ask, if the Minister answers that an agreement has been signed between the ministry and the new Menteri Besar, I want to challenge what action the Honourable Member will take.

Tuan Hee Loy SianPKR · PRPetaling Jaya Selatan

Kalau tidak?

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

I am asking the Minister, why are you interrupting, Honourable Member?

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

If not, the Honourable Member for Tanjong Karang should resign.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

We want to hear the Minister's answer.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

[Laughter] What is this? If you want to debate, go back to the Selangor State Legislative Assembly (DUN Selangor) and debate there, do not debate here.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

This Member of Parliament again does not understand manners. I am reading the details of the Selangor water supply. This is indeed our special item in Parliament, what is the use of this debate? You don't understand, Honourable Member? This is about the Selangor water supply because it is in Item 09100. Are you so stupid that you don't understand? You have no manners. If you don't know, then don't interrupt.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

When you get a little bit hurt, you jump up and try to interrupt without any direction. Read it, I am speaking from the scope of the item. Honourable Member, have you read this book? If you have not read it, then go home. If you only want to create trouble...

[Dewan riuh]

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

Please calm down a little. If you want to interrupt, Mr Chairman, you want to interrupt on an item without even reading it. I am speaking based on Item 09100, the title of which is the Selangor Water Supply Scheme. Is it wrong for me to speak about water supply for the state of Selangor? I want to ask. This person doesn't understand, don't interrupt. Just standing up without following the rules. Newly become a Member of Parliament, wanting to interrupt aimlessly. Alright, I want to ask. This is my question, let the Honourable Minister answer. Jumping about what issue? If he says he has already answered, I have already drawn my conclusion earlier. If not yet signed, okay. If not yet signed, I want to ask the ministry... [Interjection] What? I want to ask the ministry. If not yet signed, I want to ask the ministry whether the ministry will disclose the terms of the agreement as requested by the new Menteri Besar. That is my question. Okay, the second... [Interjection] That's because you didn't listen. I said two issues, Air Selangor has two issues. One is the restructuring of water supply; the second concerns Loji Langat 2. These are two matters. If you don't understand, don't talk. If you don't understand, sit quietly. Don't interrupt. Now I want to go to the Loji Air Langat 2. The Honourable Member must understand, two different things. Loji Langat 2. I want to ask the status...

[Dewan riuh]

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

What's all this noise? Stand up. Stand up. Okay, I'll sit down. Whoever wants to stand, speak. I'll give way. Now you know. If you're talking, you shut up, don't disturb. This is a bit... what are you jumping about? Don't be noisy, show some respect. Want to speak? Okay, you stand up and speak. Stand up.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Tanjong Karang, your time is up.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

No, I want to continue. The second issue...

[Dewan riuh]

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

What? What kind of behaviour is this?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

The second issue.

Datuk Seri Haji Noh bin OmarUMNO · BNTanjong KarangEN

The second issue. I want to ask about the status of the construction of Loji Langat 2. Has construction of Loji Langat 2 begun, and have all the approvals, if I am not mistaken nearly 15 to 16 approvals that must be obtained from the state government, been obtained, and has this project begun? If it has begun, what is the percentage of progress? Also regarding Loji Langat 2, I want to ask whether the tunnel that has been built from Pahang to Hulu Langat has been completed? If it has been completed, when will the water supply be carried through this tunnel? When is it expected to be completed? For example, if work on Loji Langat 2 has already started, when will Loji Langat 2 be commenced? While waiting for Loji Langat 2 to be completed, which may take three or four years, what is the status of the tunnel, which may already be completed, for supplying water from Pahang? Are there other steps, is there a Plan B, so that water from the Pahang supply will continue to be brought in and can benefit the people of the state of Selangor? Thank you. Even that, you don't understand.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Hulu Langat.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Thank you, Mr Chairman. Referring to B.29 Item 010200 – Energy. I very much hope for an explanation regarding coal-fired power plants in connection with environmental protection. Is it true that clean coal technology, with respect, used at the Tanjung Bin and Manjung Power Plants is far better in terms of environmental conservation compared with the coal power plant at Pelabuhan Klang? I request an explanation of the government's plan to use carbon capture and storage in energy generation.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Item 29 follows what the Honourable Tanjong Karang mentioned earlier: Item 020000 – Pahang to Selangor Raw Water Transfer Project Team, and P.29, Item 09100 – Selangor Water Supply Scheme, and Item 11200 – Inter-State Water Transfer. We know that the MoU between the Federal Government and the state of Selangor, and the agreement on restructuring Selangor's water supply, were signed recently.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

So the people of Selangor, Kuala Lumpur and Putrajaya hope that both governments can disclose the important details in the MoU and the agreement on this water to the public. What is the obstacle if it is not permitted? The people also want an explanation, as mentioned by the Honourable Tanjong Karang earlier, on the status of the construction of Langat 2. What is the estimated total expenditure for building the tunnel and the Langat 2 water treatment plant? Likewise, I understand that before Langat 2 is completed, water from Pahang will continue to be brought into the Langat River. Item 29, Item 40100 – Sewerage Services. I would like an explanation of how many sewage treatment plants have been built along the Langat River, and also how many plants are being rehabilitated? I ask this question because several times we have faced the problem of high ammonia levels in the Langat River, causing the water treatment plant at Batu 11, Cheras to be unable to operate. Is there no enforcement or monitoring, causing these sewage plants to discharge their sewage before it is properly processed into the Langat River? I request an explanation. Next, Item 50300 – Electricity Bill Subsidy, which previously was limited to consumers using less than RM20. Because electricity tariffs have increased, to what extent has this programme succeeded, and to what extent have the people benefited? That is all, thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Lipis. Still many more? Three, six. Okay. Three on the right, three on the left. After that the Honourable Minister will reply. Yes.

Thank you, Mr Chairman. I go to Item 030000 – Water Supply and Item 030100 – Headquarters. I want to touch on these items concerning water supply problems. Many colleagues have touched on the problem of water and also the problem with TNB. However, in my view, TNB in my area provides a very good supply. However, it is connected to water supply problems because occasionally, once every two or three months, the electricity supply is cut off, and the problem will arise for the water supply. When the electricity supply is cut off, it takes nearly three days to restore water to certain destinations. Mr Chairman, I want to touch on this because many things have happened in the area of my Parliamentary constituency which have caused several villages to frequently experience water supply problems. Some of the villages have been cut off from water for as long as two or three weeks. In my view, this is also connected to problems with water sources. Some are caused by water sources affected by mines, because heavy rain causes erosion to enter the rivers, making the rivers so dirty that the water supply has to be cut off because the water cannot be treated. In my view, to help the community in the Lipis Parliamentary constituency, I humbly request the good offices of the ministry to help so that these water plants can be upgraded and improved. These spot areas are indeed very numerous; estimated at up to 100 million for the water supply in Lipis alone. However, the most prominent spots, where water problems often occur and which the ministry can resolve, are villages from Kerambit and Relai, all the way to Mela. These water plants are old water plants that cannot supply the growing population.

So in my view, I ask the ministry to help upgrade these water plants, since these water plants are very old, and this includes the Merapoh area, the Jerangsang area, and several other areas, for which I may formally write a letter to the Honourable Minister. Too many areas need help, including the teacher training college itself, which frequently has its water supply cut off. I humbly request the good offices of the Honourable Minister so that this matter can be overcome, because in their view it is extremely critical, and there may be many other areas. I am not sure about your area, Mr Chairman, because I was informed that water in Pahang becomes even more noticeable during festive seasons. I hereby request that certain parties, including the relevant ministries, look into the rivers within the Lipis Parliamentary constituency, for example where mud flooding from Cameron Highlands itself causes groundwater to rise, so that water supply has to be cut off because it cannot be cleaned by the Pahang state water authority. I request that funds be allocated urgently to help redevelop the pipe system in the Lipis Parliamentary constituency, because it greatly affects these matters. I humbly request, Mr Chairman, support for this supply.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Bayan Baru. Five minutes, yes.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Mr Chairman, for giving me the opportunity. My question is very brief. I want to refer to Item 10300 – Penang State Water Supply Scheme. For information, the state of Penang now wants to buy water from the state of Perak, from the Perak River. This is the Inter-State Water Transfer Project that we want to involve. Usually, in terms of inter-state water transfer, it involves raw water. If we look at what happened for the state of Selangor, buying raw water from Pahang, it involves raw water. From Johor to Singapore also involves raw water. So for the state of Penang, with rapid development and rising water demand, we need new sources of water, namely from the state of Perak, the Perak River. However, this project should have been carried out last year. But until now, 2014, it is already one year late, and there is still no progress. In fact this project will take six years, and we expect that water demand for the state of Penang will not be sufficient by 2020. So we are short of time; if we do not start the Inter-State Water Transfer project, the state of Penang will face water problems like those in the state of Selangor now. However, the main problem is the reluctance of the state of Perak. In fact the state of Perak wants to sell treated water to Penang. This is something unreasonable, because I have argued earlier that inter-state water transfer involves raw water, not treated water. When the state of Perak wants to sell treated water to Penang, it wants a premium charge. This will make the cost of water too high. From a technical standpoint, if water from the state of Perak is treated in the state of Perak and then transferred to Penang, that also does not make sense, because it will lose a fairly high level of non-revenue water. So this does not make sense.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

So we ask the Ministry of Energy, Green Technology and Water (KeTTHA) as the Federal authority to intervene, to step in and bring both parties together to reach an agreement. Until now we have tried to contact the ministry, but there has not been sufficient progress. However, we see that for the state of Selangor, such as Langat 2 and also the Pahang to Selangor inter-state transfer project, the ministry is active. But in Penang it appears passive. The ministry has no desire.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

So is this a double standard by the ministry? We want, if possible, the Minister to come down actively, bring the two parties to discuss, set a price, and let this inter-state water transfer happen, because this involves three million residents in Penang. That is all from me. Thank you, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Hulu Rajang. Five minutes, brief.

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Thank you, Mr Chairman, who is kind and wise, Mr Chairman.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Terima kasih.

Tuan Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

I will briefly refer to Item 11600 – Sarawak State Water Supply Scheme. Sungai Asap, which is very renowned and located in the Parliamentary area of Hulu Rajang, is a resettlement area that houses the residents affected by the construction of the Bakun Hydroelectric Dam, Mr Chairman. However, after the residents had lived there for 15 years, and the Bakun Dam had been completed and become a mega project, the main power generator, I think it is not even a main source of income for the country. Residents in Sungai Asap still face the problem of water supply that is cut off every time, and poor water quality due to oil palm plantation activities along the Sungai Koyan, which is located here now. Therefore, I humbly request the good offices of the ministry to allocate a sum of funds to consider or to build a new water plant to supply treated water to residents in the Sungai Asap area as a token of thanks to the local residents for their sacrifices all this time. That is all, thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Honourable Petaling Jaya Selatan. Also five minutes.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Thank you, Mr Chairman. Brief only, Item 80000 – National Sewerage Project. I want to refer to a project under the KeTTHA ministry along Jalan Gasing, Petaling Jaya. The project being carried out is an integrated sewerage system between Seksyen 5 and Seksyen 9, where this project has also been running for a very long time, but this project seems very slow. This is because Jalan Gasing is a two-way road. Because of this project, one lane had to be closed and it has become only one lane. Because the work is slow, usually in the morning and evening, this road is always jammed, with traffic congestion occurring all along Jalan Gasing. I want to ask the Honourable Minister, when will this project be completed? I also want to ask the Minister, especially about these projects at night, when no work is done at night and there are no lights at all for this project, causing many road accidents, especially at night because it is dark. So, I hope the Minister can call on the contractor concerned to install lights along that road, especially at this contract site. Secondly, also about the integrated sewerage project that will be carried out in the Taman Medan and also Taman Dato' Harun areas. I have also been informed that this new project will be carried out next year. Until now we do not know about this project; we do not want it to be like the earlier project along Jalan Gasing, with no dialogue and no notice to residents about this project.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Although this project is from the federal government, the Council is also responsible for looking after this project so that local residents understand its purpose, safety, and the roads being occupied, which will cause traffic congestion. So I want to ask when this project will begin? The integrated sewerage system project to be carried out in Taman Medan and Taman Dato' Harun in the PJS2, PJS3 and also PJS1 areas. When will the dialogue and meeting be held, especially involving the contractor and also parties from KeTTHA and also the Petaling Jaya City Council (MBPJ)? Thank you.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, after the Honourable Putatan, the Honourable Ipoh Timur, the Honourable Tebrau, and finally the Honourable Klang. After that, the Minister will reply.

Tuan Er Teck HwaDAP · PRBakriEN

Including Bakri, five minutes only.

Thank you, Mr Chairman. I thank you for giving me the opportunity to also debate under the Ministry of Energy, Green Technology and Water, which has been allocated RM2.9 billion.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Five minutes, yes, Honourable Putatan.

I will go straight to it, Mr Chairman. Although I have been given an answer on the SAIDI question in Sabah, where SAIDI has already increased to 700 last year from 424 to 700 SAIDI, which is quite terrible, the Minister's answer is already there. I hope this ministry can truly give assurance that SAIDI can be reduced within a limited time, because that was the Minister's promise when answering my question last week. Honourable Minister, I want to touch on Item 030000 – Water Supply, which has been allocated RM34.2 million. I want to ask the Honourable Minister specifically for the state of Sabah. Is the Honourable Minister aware that NRW in the state of Sabah, especially in Kota Kinabalu, is very bad? There is still nothing showing any progress or improvement regarding this NRW. This is due to much that is said to be, one, wasteful or irresponsible use. Also, the leakage of old pipes. Old pipes that have not yet been replaced, even though some new ones were made through the Ministry of Rural Development, but within the urban area there are still many old pipes that need to be replaced. Two or three years ago, the ministry promised to do something to overcome the NRW problem. However, until now, no improvement is visible on NRW, particularly in my area in Kota Kinabalu in Pantai Barat. I want to ask the Minister, do you have statistics on water usage, showing the division between factories, industry, and how much is used for what is not counted as public use and so on? What percentage, what proportion, is consumed by humans themselves?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Putatan.

This is important. Honourable Deputy Minister, Mr Chairman's constituency, I think, also has NRW there... [Interjection] So I don't know, perhaps there is no problem in Mr Chairman's area. So I hope that through Item 11400 – State Water Supply Scheme, the development portion, namely a proposed dam at Ulu Penampang, at Ulu Papar, has it already happened? There were objections from residents, where the area would be flooded and there is no plan at all to relocate and resettle the residents affected by the dam.

Until now there has been no news at all. So what is the outcome that has already been disseminated in the media, publicly announced by the state government, publicly announced by the Federal Minister at some point, that until now has not happened? Has it already happened?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

Yes, thank you, Honourable Putatan.

Within these 10 years, Mr Chairman, within the next 10 years, Kota Kinabalu will face problems with a shortage of water supply. If this is not addressed quickly, our problem, perhaps we will be wiped out, rejected by the people. I ask the Honourable Deputy Minister to answer this with a confidence that will reassure the people, especially in Kota Kinabalu.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Terima kasih.

That's enough. Any more?

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)

Cukup.

Terima kasih.

Mr Chairman (Datuk Haji Ismail bin Haji Mohamed Said)EN

I invite the Honourable Ipoh Timur.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Thank you, Mr Chairman. I am entering Item 010200 – Energy. Mr Chairman, the issue I wish to raise here concerns the issue of the calculation of TNB electricity bills, where TNB claims under-charging, or situations where TNB claims that the meter has been tampered with or altered by the consumer. In such situations, consumers have absolutely no method or means to ensure that the amount of under-charging calculated by TNB is accurate, reasonable and fair. [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) chaired the Committee] We often receive complaints from members of the public who say that they have received notices to pay thousands of ringgit by TNB on allegations of under-charging or meters that did not record the correct readings. Most of them feel dissatisfied because TNB's actions are seen as biased and not in accordance with existing law. Mr Chairman, under section 37(1) of the Electricity Supply Act 1990, which provides that an offence where a person is found, with your permission I read, "A person who tampers with or adjusts any installation that likely to cause danger to human life shall be guilty of an offence punishable with a fine not exceeding one hundred thousand ringgit or jail term of not exceeding three years or both…" Furthermore, under section 37(3) it provides that, "A person who dishonestly abstracts electricity, consumes electricity, uses electricity, alters the index of any meter or prevents such meter or instrument from duly recording the output of consumption of the electricity shall also be guilty of an offence…" Likewise, it may be fined not exceeding RM100,000 or jail term of three years or both. Mr Chairman, meanwhile under section 38, which is important, the Electricity Supply Act 1990 provides that if TNB finds evidence that an offence has been committed under section 37(1), 37(3) and 37(14), TNB may give 24 hours' notice to cut off the electricity supply if the consumer fails to comply with the notice. Furthermore, under section 38(5) of the Electricity Supply Act 1990 it is very clear that any consumer who fails to pay the amount stated in the notice issued by TNB under section 37, TNB may take civil legal action to recover the amount of loss from that consumer.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Mr Chairman, although the provisions under sections 37 and 38 are very clear on how TNB may bring criminal charges and recover the money or the amount of electricity usage alleged to be under-charged, TNB does not comply with those provisions. TNB should bring criminal charges under section 37 before taking civil action against consumers to recover the money alleged to be under-charged. Most TNB incidents directly charge consumers under section 38 to recover money, and take civil action. Usually TNB does not bring criminal charges under section 37 to prove that the consumer has committed a criminal offence before taking civil action to recover the under-charged amount, because TNB knows it is difficult to prove any tampering or alteration of TNB's meters.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, you may, Honourable Member.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Just a little. TNB's action causes problems for consumers because it forces consumers to pay money to TNB without TNB needing to prove that the consumer has committed an offence under section 37(1) or section 37(3). With your permission, Mr Chairman, this causes consumers to be arm twisted, with permission, to pay those notices. Otherwise their meters will be cut, their electricity supply will be cut off. Therefore, Mr Chairman, I propose that TNB should take action to prove the consumer's offence first before taking civil action to recover the money. It is fairer, because if in court a person commits an offence, he is brought before the court, but in TNB's case there is none at all. So, I call on the government to review these provisions and enact clear legislation so that there is no confusion over the powers or actions that TNB may take in these cases.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That's enough, Honourable Member.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Finally, Mr Chairman, I hope the government will ensure that TNB officers who often do not comply with or follow the SOP in arresting consumers alleged to be under-charged or to have tampered with meters, establish a fixed SOP so that everyone knows how TNB is to enforce or resolve this problem. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Tebrau. After the Honourable Tebrau, the Honourable Klang, and after that the Honourable Deputy Minister will answer.

Tuan Er Tech HwaDAP · PRBakriEN

Mr Chairman, later please [give the floor to] Honourable Bakri.

Tuan Khoo Soo SeangMCA · BNTebrauEN

Thank you, Mr Chairman. I am touching on Item 06400 – Johor State Water Supply Scheme, and what I want to ask is regarding the Rainwater Harvesting System. I want to ask the ministry whether the ministry has identified the effectiveness in terms of saving water use and environmental protection with the Rainwater Harvesting System. If it is found to be effective, will the ministry encourage the private sector and also the government to install the Rainwater Harvesting System, and what incentives will be provided? Will government buildings take the initiative to install the Rainwater Harvesting System, and I also think that schools are among the institutions that use a lot of water and schools are also places that provide education. So do we want to encourage schools, especially newly built schools and those to be built, to install the Rainwater Harvesting System, because this not only can save the school and the government, but also provides good education to school children.

Tuan Khoo Soo SeangMCA · BNTebrauEN

I also want to ask, what incentives does the government provide for R&D work on water saving and recycling projects and related projects. Second, is regarding strata ownership. So far flats are strata-titled. Therefore they use water and energy payments at commercial rates, and therefore poor people living in flats still have to pay water and electricity bills that are more expensive than the domestic rate.

Tuan Khoo Soo SeangMCA · BNTebrauEN

So, what is the government's plan to ensure that each unit in these flats is allowed to install its own meter. So that they can get water and electricity supply at the domestic rate. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Klang.

Dato' Ikmal Hisham bin Abdul AzizBERSATU · PNTanah MerahEN

Can the Honourable Tanah Merah have four minutes after this?

Tuan Er Teck HwaDAP · PRBakriEN

Mr Chairman, only three minutes, Honourable Bakri.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

I cannot, Honourable Member. The Deputy Speaker has already made a decision, so we must abide by the decision that has been made. However, you may share time; Honourable Bakri may share.

I will raise several issues related to Item 020100 – Pahang to Selangor Raw Water Transfer Project Team, including Langat 2. Mr Chairman, I would like to propose that a monitoring body be established to oversee and monitor all expenditure, including the tender process for the Pahang to Selangor raw water transfer project and Langat 2. This is a major project worth RM5 billion. This body could be made up of the MACC, Transparency International, professional bodies including the National Water Services Commission (SPAN). This proposal is made to overcome leakage, corruption, direct negotiation or direct tender in the management of this project. Yesterday, the Chairman of the PAC, the Honourable Pulai, said that as much as RM200 million was wasted on the purchase of an incinerator because of direct negotiation. He said the ministry concerned approved unproven incinerator technology without carrying out any due diligence. This is a serious accusation Mr Chairman and there may be elements of corruption and abuse of power. Before that we found that the construction cost of KLIA2 rose from RM1.7 billion to RM4 billion and until today there has been no acceptable explanation to the people why the construction cost increased by more than 200 per cent. What is clear is that the increase in costs, leakage and direct negotiation will burden the people through high taxes and also high charges. So, in order to avoid burdening the people, in the personal interest of the ministry to establish one oversight body. This oversight body can be used by the government to inform the public of the development in the implementation of this agreement. In my answer last week, the Honourable Minister said that indeed there is a committee to monitor Langat 2 co-chaired by the Honourable Minister and also the Menteri Besar of Selangor. However, I want to tell the Honourable Minister that this committee is a management committee. What I propose is a committee whose specific aim is to reduce wastage, leakage, corruption and abuse of power. With this strategic approach we can prevent the Langat 2 Project worth RM5 billion from becoming RM10 billion in two or three years' time.

I hope that in the interest of the people, the ministry and the government will accept this proposal. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Minister, please.

Dato' Seri Mahdzir KhalidUMNO · BNDeputy Minister of Energy, Green Technology and Water · Padang TerapEN

Assalamualaikum warahmatullahi wabarakatuh and good afternoon. Mr Chairman, Honourable Members, first of all, on behalf of the Ministry of Energy, Green Technology and Water (KeTTHA), I would like to record my appreciation and thanks to all Honourable Members from the government and also the opposition who took part in the debate on the Supply Bill 2015 for KeTTHA. As Mr Chairman and Honourable Members are aware, there are only three components in this Ministry of Energy, namely the energy sector, the water sector and the green technology sector. I noticed earlier that many Honourable Members touched on all three sectors, the water sector, the energy sector and also the green technology sector. So, allow me to say a little here regarding the Honourable Member from Simpang Renggam, who raised the matter of water supply in Johor state. Allow me to inform you that Johor is indeed one of the states that has carried out a migration of water between the water company and also PAAB. The water company in Johor is operated by Syarikat Air Johor (SAJ). So, as the Honourable Member for Simpang Renggam said, the current position of the upgrading works at the Sembrong Barat water treatment plant is from 60 million litres a day to 80 million litres to overcome disruption. The design capacity of the Sembrong water treatment plant is 80 million litres. However, at this time the plant can only treat and produce 60 million litres of treated water. Operation below the design capacity is due to problems with the water source from the Sembrong Barat Dam. The Johor State Government has appointed consultants to carry out a study to resolve this problem. In addition, to ensure long-term treated water supply to the Kluang district, the government is implementing the construction of the Kahang Dam and also the Kahang Water Treatment Plant, which is expected to be completed in 2017.

Datuk Liang Teck MengGERAKAN · BNSimpang Renggam

Minta mencelah.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Simpang Renggam, please stand, Honourable Member.

Datuk Liang Teck MengGERAKAN · BNSimpang RenggamEN

Mr Chairman, the water supply problem in Layang-layang and Simpang Renggam has been going on for a very long time. From now until 2017, residents must wait another three years. So, I just want to know, is there no intention or plan that is really meant to increase the capacity of the water treatment plant at Sembrong Barat? Thank you.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

As I mentioned earlier, the Johor State Government has appointed consultants to review how to increase the capacity from 60 mld to 80 mld. I expect the state government to be able to resolve this matter. Honourable Mr Chairman, I would like to mention here that in matters relating to water supply, this applies to all states, not only Johor, because matters relating to water, especially raw water, fall under the control of the state government. Of the Peninsula, where water is placed under the WASIA Act, some states have already migrated to the Federation and some have not. I can mention here that those which have already migrated to the Federation are Johor, Melaka, Negeri Sembilan, Perak, Pulau Pinang and also Perlis. Negeri Kelantan is now at the final stage of finalising the agreement. Negeri Terengganu, Kedah are at the stage of consultation meetings, and also the state of Pahang. Meanwhile Selangor is in the migration process, once they have finished signing between the state government and the water concession in the state of Selangor.

Dato' Seri Mahdzir KhalidUMNO · BNPadang Terap

Keduanya...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Bakri, please stand, Honourable Member.

Dato' Seri Mahdzir KhalidUMNO · BNPadang Terap

Ya.

Tuan Er Teck HwaDAP · PRBakriEN

Honourable Deputy Minister, may I have the opportunity for Bakri to ask one question about water supply in Johor? Okay. Thank you, Mr Chairman, and thank you, Honourable Deputy Minister, for giving Bakri the opportunity. Here I want to ask the Honourable Deputy Minister, I want to obtain the ministry's explanation regarding the sodium standard for treated water supply adopted by our country. In the ministry's reply it only stated the national water supply standard and the WHO standard for chloride content, but did not state the sodium standard. The answer given to me is also misleading because it did not publish the reading results for that period. Instead, only the readings from 14 March to 23 March 2014 were given. Moreover, based on the reply letter from the Muar District Health Office, it also shows that chloride reading levels were severely affected starting on 10 March and 11 March 2014. Why did they wait until 14 March 2014 to begin more frequent testing? I ask for an explanation from the Honourable Deputy Minister. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, very polite of you, Honourable Bakri.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Mr Chairman, thank you to the Honourable Bakri. The Honourable Bakri is one of the Members of Parliament who frequently raises problems involving the Muar area. So, not only in the House, outside the House too he met me, asked me and told me. I think the way, the method he has used, is the best, Honourable Bakri. Only I cannot answer that because it is rather technical. So, let me answer in writing. Mr Chairman, I think I will finish with water first. After that we will move on to the energy matter raised by the Honourable Petaling Jaya Utara. So, apart from that, there is also a question raised by the Honourable Lipis regarding the water supply in Lipis. For the information of the Honourable Lipis, an allocation of RM15 million has been made for the Lipis water supply as a loan under the Tenth Malaysia Plan. For the purpose of pipe replacement, the government has allocated RM35.3 million under the Non-Revenue Water (NRW) Programme, with permission, Kuala Lipis District, under the Tenth Malaysia Plan. KeTTHA (Ministry of Energy, Green Technology and Water), the ministry is ready to consider the new project proposal to be submitted by the Honourable Member to the government. At the same time, we also hope that the Pahang State Government can expedite the restructuring of the water services industry structure so that the financing for the upgrading of water treatment plants and distribution systems is funded by Pengurusan Aset Air Berhad (Water Asset Management Berhad). That concerns Lipis. Then, the third point concerns the Honourable Tanjong Karang, also regarding water supply that is related to Klang as well. I would like to inform the Honourable Tanjong Karang that the construction of the Langat 2 Water Treatment Plant, as of the end of October 2014 for package 2A, which has been awarded to the contractor, the construction of the Langat 2 Water Treatment Plant Phase 1, the overall percentage of progress is 1.54 per cent. At present, earthworks are being carried out. The approvals that need to be obtained from the state government, such as approval for private land, drainage systems, road upgrading, and also approval for the release of a small portion of forest reserve, and other approvals that are being finalised to be submitted to local councils such as Ampang Jaya Municipal Council, Subang Jaya Municipal Council and DBKL (Kuala Lumpur City Hall). Those are among the approvals.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

However, the state government has granted planning permission, and Kajang Municipal Council has given permission to enter the site and thereby carry out the Langat 2 Water Treatment Plant Project there. This is related to the agreement of the state government with the Federal Government, where an agreement, an agreement, has been signed by the Federal Government and the state government. In the components of the agreement, with the consent of the Federal Government and also the state government, are two components. One, the state government asked that the water concession be handed over to the state of Selangor, and the Federal Government asked that this Langat 2 Water Treatment Plant Project be allowed to proceed. So, those are just two matters. I think what we are talking about regarding disclosed or not disclosed, can it be disclosed? Can people know? I think those are only the two matters in that agreement. If we say this, it seems as though there is something secret, something that wants to be concealed. So, I think that...

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya Utara

[Bangun]

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Just a moment, Honourable Petaling Jaya Utara. Let me finish briefly. So, on that matter, what we are doing now, which the Federal Government did before the Pakatan Rakyat government in the state of Selangor, is that there was an agreement between Selangor and Pahang to transfer raw water. Eventually, when they agreed, the Federal Government took the initiative. On the Pahang side we built the Klau Dam, also called the Semantan intake, where there is a pumping house that pumps. Then there is a tunnel, and then on the Selangor side is where the Langat 2 Water Treatment Plant is located. After the plant, there are further lines, distribution that will be carried out. This is a process that is under way. That is in relation to the matter concerning

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Lipis and the Honourable Petaling Jaya Utara stand up.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

The Honourable Petaling Jaya Utara.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Petaling Jaya Utara.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Briefly, Honourable Deputy Minister. I accept that the answer given, that the agreement is only regarding the takeover of the water company and also the grant of permission to build the Langat 2 Water Treatment Plant. If that is all, and there are no matters that need to be examined or detailed, why can this agreement not be disclosed openly, classify the contract? Why must it still be concealed by using the Official Secrets Act? That is number one. Number two, in this matter we already know that Syarikat Puncak Niaga and also SYABAS have signed the agreement with the Selangor State Government. As for ABBAS, there is no problem because it is a subsidiary of the Selangor State Government. We know there is a problem with the company SPLASH. If SPLASH does not sign the agreement with the Selangor State Government, in the agreement, will the Federal Government, in keeping with the spirit we know of in the Federal Government agreement, use the Water Services Industry Act (WASIA), Article 114 or Article 119, to force or take over SPLASH by force? Thank you, Honourable Deputy Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Lipis and Klang stand up. Honourable Minister.

Dato' Seri Mahdzir KhalidUMNO · BNPadang Terap

Ada lagi?

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Yes, Honourable Lipis.

Thank you, Mr Chairman. I have just a small question for the Deputy Minister concerning that dam. Can the water supply from the state of Pahang provide assurance, particularly for Raub, when we supply water to Langat, is there assurance that the water in Pahang is sufficient, because we know the water problem in Pahang is quite serious too, particularly in Lipis and Raub.

I know Lipis and Raub are rather serious, for the factors I mentioned earlier. I wish to thank the Deputy Minister who answered earlier, who has provided a small allocation although I know it is not sufficient, but at least the black spot areas can be resolved. Thank you.

Thank you, Mr Chairman. Honourable Deputy Minister, actually if we look at newspaper coverage regarding the Selangor water agreement issue, we find there are two aspects to that agreement. One aspect is that the responsibility of the Selangor State Government is to take the land or land approval and also to provide development orders through the local authorities (PBT), that is all. However, if we raise the issue of cost, the technology to be used, the tender process and so on, the Selangor State Government has absolutely no responsibility or no involvement in the project itself. So, this clearly means that the Selangor State Government has become a second class citizen in this agreement. The Minister the other day also said that he did not challenge me, he said he would keep silent on this matter when I raised this issue during the policy debate. However, the issue I raised just now, which is related to the way the agreement was made, was to set up a monitoring body so that this RM5 billion project does not become RM10 billion. So I believe now the Federal Government must make a decision, a resolution to set up, or to formulate such a council so that leakage, corruption and so on can be eliminated or reduced. I ask for views and explanation.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Honourable Petaling Jaya Utara and Honourable Klang, I think both of you already know the answers to both, but you keep asking questions. So, the first question about this Lipis matter: we give assurance to the good state of Pahang, which supplies water to Selangor, that Pahang's water supply will not be affected. So, returning to the account in this matter, I wish to inform here that in that committee, that committee between the federal and the state, with permission, the Minister and the Menteri Besar become joint chairmen, and after that senior officers of the ministry and also officers at state level who are related to water supply are placed there, including the state secretary. So they can see. This is because, Mr Chairman, the tender was made earlier, the tender was made a long time ago. Then after a long time, only then did the Selangor State Government agree to give way to Langat 2. So when the Selangor State Government gave way to Langat 2, only then was the tender awarded to the company concerned. After that, only then did we proceed, only then did we come to the agreement made between the state government and the Federal Government. I am confident, Honourable Member, that this special committee, which will be co-chaired, can also monitor the entire project. We do not need a special committee because these projects can be evaluated by representatives of the state government and also representatives of the Federal Government. This is because now we already know how many lines, how large a pipe to be brought from Langat 2 to the state of Selangor, to Kuala Lumpur. How much, we already know, the quantity has been provided by the consultants. The water supply project, its cost too we already know, and that is the price that will be used until completion in 2017. Furthermore, here...

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong Karang

[Bangun]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Tanjong Karang, Honourable Member.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

I wish to ask. I raised this in my earlier speech. The Honourable Deputy Minister said that the agreement was signed between the Federal Government and the state government. May I know, who represented the state government? My earlier question was, is this agreement with the new Menteri Besar? Has it been signed by the new Menteri Besar, because this state government has two Menteri Besar... [Interjection]

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

I wish to ask. I wish to ask...

[Dewan riuh]

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

This shows he is afraid, shaking, because the former Menteri Besar was sacked, one of the reasons being precisely the water issue. So I wish to ask whether the agreement with the new Menteri Besar has been made or not, firstly. If it was indeed made with the new Menteri Besar, how, how can the Honourable Klang say Selangor can become a second class citizen? If it is to make Selangor a second class citizen, it must be because the new Menteri Besar had it signed. Earlier he said he would study it. So I wish to ask, if it is true the new Menteri Besar has signed, has he changed the terms of the agreement that was signed by the former Menteri Besar? That is what I want to know...

[Dewan riuh]

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Patience, patience, Selangor folk.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, this is not the Selangor State Legislative Assembly, Honourable Member. [Laughter]

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Honourable Mr Chairman...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Honourable Tanjong Karang, remember this is the House...

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

I think the agreement between the state government and the Federal Government was signed by Honourable Tan Sri Khalid as Menteri Besar. After that, the new Menteri Besar of Selangor agreed to and endorsed the agreement, only then did he permit...

[Dewan riuh]

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Listen first. So that is precisely why Puncak Niaga and SYABAS could sign. If the Most Honourable new Menteri Besar did not agree, SYABAS and Puncak Niaga could not sign the agreement with Kumpulan Darul Ehsan.

Honourable Deputy Minister, there is a slight error. Not completely agree, but there are issues related to cost, technology and so on, but overall he agrees.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Overall, meaning the Menteri Besar agreed. If there are perhaps one or two matters, but overall the Menteri Besar agreed.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Let me explain this further, he says this Deputy Minister...

Honourable Tanjong Karang, the state assembly sitting is next week.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Yes, who? Who is interjecting?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Others, do not interfere, he is interrupting one person.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Stand up if you want to ask properly, do not interject.

What else needs to be explained? What, Honourable Tanjong Karang? The Minister has already made that clear. This is a waste of time.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

I wish to ask.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Klang.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Is there not another reason, because this issue is important. When the new Menteri Besar said he wanted the disclosure...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Honourable Tanjong Karang wants to become Menteri Besar?

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Earlier too the Honourable Klang admitted it. Honourable Klang, I am a son of Selangor. The Honourable Klang admitted today that the people of Selangor have become second class citizens. If this Menteri Besar truly fights for the sons of Selangor, why can he bless and agree to the agreement that was signed by the former Menteri Besar? This is shameful...

[Dewan riuh]

Honourable Tanjong Karang, Honourable Tanjong Karang...

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

The Honourable Member himself said...

[Dewan riuh]

The Honourable Gombak has come to defend himself. Do not go too far here now that the Honourable Gombak has come.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Klang, Honourable Kapar, sit down.

Just want to make noise...

[Dewan riuh]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, sit down, Honourable Member.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Why can the Menteri Besar bless it? If the Menteri Besar did not bless it, fine, disclose the agreement.

Be patient first, not entirely...

[Dewan riuh]

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

These are all bootlickers.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Others sit down, Honourable Member. Only the Honourable Tanjong Karang is speaking, others sit down, Honourable Member.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

This is not an agreement...

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

The Honourable Klang said Selangor is a second class citizen. I am a Selangor person, this is shameful. I ask for it to be withdrawn.

This is UMNO second class citizen, this is. [Laughter]

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Why insult the sons of Selangor? What is the insult? I ask for it to be withdrawn. This one is not a son of Selangor. The Honourable Member is from Johor. This one is not a son of Selangor. This Johor person, do not talk so much. I am a son of Selangor.

When the Honourable Gombak has discussed it, then the sons of Selangor! Those who are making noise here, what for?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Sit down, Honourable Member. Others sit down, Honourable Member. Honourable Klang, Honourable Kapar, sit down, Honourable Member.

Honourable Tanjong Karang, sit down first.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Why not do anything?

Genuine sons of Selangor, do not play around!

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Not allowed, Honourable Member.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

This is an insult.

Do not play around, go back. Go back, do not interfere. Go back and sit quietly, do not interfere. You are a disgrace to Selangor.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

The new Menteri Besar has blessed the water agreement. Now the Honourable Klang claims that saying Selangor is a second class citizen shows that he is insulting the new Menteri Besar.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Minister..

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

This is why Barisan Nasional did not win in Selangor.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Sit down, Honourable Member. Others may not interject. Only one person may interject.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Pity the Member of Parliament for Tanjong Karang, there is no...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, Honourable Member.

This is a waste of time.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

No one wants to help, have pity. Sit down, go back.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Sit down, Honourable Member, sit. Honourable Kapar, sit down, Honourable Kapar...

[Dewan riuh]

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Demanding to disclose what agreement?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Tanjong Karang...

Genuine sons of Selangor, do not look for trouble.

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

Honourable Klang, it is an insult to the people of Selangor to say Selangor is a second class citizen.

This is a waste of time, Mr Chairman!

Datuk Seri Haji Noh bin Haji OmarUMNO · BNTanjong KarangEN

...And insulting the Menteri Besar of Selangor.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, sit down, Honourable Member. Please proceed, Honourable Minister. Honourable Kapar, sit down, Honourable Kapar. Honourable Minister.

Ha, thank you. See you again.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Kapar, sit down.

Ha, sit, sit.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, Honourable Minister.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Are shrimps included in this agreement?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, Honourable Member.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Finished already, finished already?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Habis sudah.

Dato' Seri Mahdzir KhalidUMNO · BNPadang Terap

Saya dalam...

Honourable Minister, an explanation. I have heard the explanation from the Honourable Minister regarding the monitoring system. The Honourable Minister said that the joint committee between the Honourable Minister and between the Minister and also the Selangor Menteri Besar...

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

That is the Honourable Klang's proposal, that one. Your proposal. Now we already have a committee. We do not need...

I have a problem with that answer because we find the same answer was given when they were building KLIA2. But now we see KLIA2 RM1.7 billion has risen to RM4 billion.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

We are now about to complete it, Honourable Member.

So, therefore, would it perhaps be appropriate...

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Not appropriate. Not necessary, not necessary.

Tidak perlu?

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

It is not necessary now, I want to tell the Honourable Member, for example, the tunnel has reached 98.5 per cent. It is not as if only 0.15 per cent remains. What is truly not yet under construction is only Langat 2.

What I know is that the Langat 2 contract was only awarded for parcel 1 to parcel 7, but there are about 20 parcels.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

We have tendered, but the pipeline is not yet complete. To send to Shah Alam, to wherever, the tender is not yet complete. A committee can look at that together. The Menteri Besar is there as chairman together with the Minister. Can look. There is no problem. I think it is not necessary, Honourable Member. We have wasted time on one topic which I consider important, but I see the way we are handling it, until the Honourable Member himself says we in Selangor are all second class, have pity. Because there are many more people from other states here.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Honourable Minister, may I have just a little?

Dato' Seri Mahdzir KhalidUMNO · BNPadang Terap

Ya, boleh.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Can the Honourable Minister repeat, from the perspective of the cost of the tunnel as well as the construction of Langat 2. Thank you.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Saya minta masa sedikitlah sebab yang ini figure. Nanti minta tolong pegawai bagi. Jadi saya ingat kes yang berkaitan dengan kita di Selangor dan juga Pahang ini pembinaan air mentah pada kita, kita anggap bahawa ia boleh diselesaikan dengan cara yang terbaik dan kita sebenarnya mencari jalan penyelesaian dengan cara yang terbaik. Untuk tujuan the Honourable Member for Tanjong Karang bangkit tadi, apa hendak buat sementara Langat 2 tidak siap, terowong sudah siap. Kita sekarang sedang membina sebuah terowong dari terowong itu kita membina satu saluran air sejauh 1.5 kilometer ke Sungai Langat. Maknanya pada hujung bulan ini the Honourable Member inshaaAllah kita boleh guna 1.5 kilometer air itu kita lepaskan masuk dalam Sungai Langat. Jadi maknanya kita hendak tambahkan air mentah dalam Sungai Langat dan ini kita buat kerana kita sedar bahawa hari ini waktu kita sedang dalam this august House ini di Sungai Selangor memang air telah meningkat. Hari ini telah mencapai 55 peratus daripada asalnya dalam 35 peratus. Maknanya kenaikan dalam lebih kurang 20 peratus. Akan tetapi kita bimbang sekiranya Januari, Februari, Mac ini kalau tidak ada hujan dan kalau kita pakai kapasiti macam biasa sebab untuk Selangor, untuk Kuala Lumpur dan untuk Putrajaya kita menggunakan lebih daripada enam bilion MLD satu hari dan kita ada dekat dua million, dengan izin, pengguna ataupun customer kepada bekalan air di sini. Jadi sudah tentulah kapasiti yang digunakan itu akan kita haraplah bahawa kita boleh bertahan sampai ke tahun hadapan tanpa ada apa-apa masalah catuan kepada tiga buah wilayah ini Selangor, Kuala Lumpur dan juga Putrajaya. Saya hendak beralih ke Pulau Pinang. Berhubung dengan kes air mentah di negeri Perak. Saya hendak maklum di sini bahawa air mentah ini sememangnya di bawah kerajaan negeri-negeri yang ada di Malaysia ini dan negeri Perak dan negeri Pulau Pinang hendaklah membuat perundingan. Kalau ada apa-apa perundingan itu yang datang kita di peringkat kementerian boleh membantu. Maknanya kena mula dahulu antara Pulau Pinang dan Perak untuk berbincang bagaimana saluran air mentah boleh dibawa dari Perak ke Pulau Pinang sebab...

Tuan Sim Tze TzinPKR · PHBayan Baru

[Bangun]

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Sekejap the Honourable Member. Sebab Pulau Pinang juga ada mengambil air dari Kedah. Ambil air dari Kedah tetapi dalam kes Kedah, sepanjang Sungai Muda itu daripada hulunya upstream dengan izin, sampailah ke Pulau Pinang lebih kurang 50 lebih kilometer. Akan tetapi sempadan antara Kedah dan Pulau Pinang itu ada lebih kurang 10 kilometer. So, the Honourable Chief Minister of Penang sebut bahawa kita ambil air mentah itu daripada sebelah dengan Pulau Pinang sebab katanya sempadan Kedah itu di tengah-tengah Sungai Muda itu. Jadi saya ulang balik the Right Honourable Chief Minister of Penang sebut bahawa dia mengambil atas International Water Protocol. Katanya mana-mana negeri atau mana-mana negara yang ada sempadan di tengah-tengah itu di situlah boleh menjadi common river dengan izin. Akan tetapi dalam kes Kedah...

Tuan Sim Tze TzinPKR · PHBayan Baru

[Bangun]

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Saya habiskan Kedah. Dalam kes Kedah, Kedahlah yang menjaga upstream water catchments area, empangan dijaga oleh negeri Kedah tapi sampai hari ini Kedah tidak mendapat satu sen pun bayaran dari Pulau Pinang. Atas ihsan pun tidak ada untuk jaga water catchments area. Jadi dalam kes Perak dengan Pulau Pinang, eloklah kalau Pulau Pinang dan Perak duduk dahulu berbincang dan kalau ada formula yang dibawa, kita di kementerian boleh membantu. Ada Yang Berhormat hendak bangkit?

Tuan Sim Tze TzinPKR · PHBayan Baru

Penjelasan.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Mr Chairman, saya rasa the Honourable Minister jangan divert attention. Kita fokus ke Pulau Pinang dengan Perak. Jangan melibatkan Kedah. Kedah ini isu sudah selesai. Sekarang apa yang berlaku...

[Dewan riuh]

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Diamlah. Tidak ada kena-mengena dengan kawasan you. Isu sebenar sekarang Kerajaan Negeri Pulau Pinang telah berunding dengan Kerajaan Negeri Perak, sudah lama ada perbincangan. Sudah berbincang lama tapi sekarang telah menemui buntu jalan...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Jalan buntu the Honourable Member.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Jalan buntu. Jadi itu sebab kita minta kementerian step in untuk menyelesaikan masalah ini. Ini kerana Perak mahu jual treated water, Penang mahu raw water. Perundingan tidak boleh berjalan lagi. Jadi, sebab itu kementerian kena masuk bagi tahu Perak bahawa interstate water transfer harus melibatkan raw water, air mentah. Jadi minta the Honourable Minister jalankan tugas the Honourable Minister ya.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Isu yang sama.

Dato' Seri Mahdzir KhalidUMNO · BNPadang Terap

Saya ingat....

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Boleh saya tanya bersama dengan isu sama supaya dapat dijawab dengan serentak. Terima kasih Mr Chairman. Apa yang telah dinyatakan tadi, Perak telah mengumumkan bahawa Perak hanya akan menjual air yang dirawat ke Pulau Pinang. Masalahnya ialah, bagi saya, tidak ada semangat 1Malaysia ini di Malaysia yang sentiasa dilaung-laungkan oleh Perdana Menteri kerana dalam tahun 2008, apabila Pakatan Rakyat memerintah negeri Perak, secara prinsip kita sudah bersedia untuk menjual air mentah kepada negeri Pulau Pinang dan juga Selangor. Pada masa kini, masalah di Perak ialah semua air yang berlebihan- kita memang di negeri Perak mempunyai banyak air yang jernih, bersih dan berlebihan. Hanya mengalir ke laut sahaja, sia-sia sahaja. Tidak ada pun apa-apa loji yang dibuat untuk merawat, menjual air kepada orang lain, melainkan kepada negeri Pulau Pinang dan Selangor. Jadi semangat 1Malaysia ini tidak ada. Saya berharap the Honourable Minister dapat menolong dalam isu ini supaya kita rakyat Malaysia menikmati kurnia Tuhan kepada kita air bersih dan janganlah disia-siakan, disalurkan ke lautan besar itu. Terima kasih.

The Honourable Deputy Minister, the Honourable Member for Kuala Kangsar hendak menjawab isu berkaitan yang sama.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Menyampuk]

Menjawab. Ini isu air di Perak dan Selangor, kemungkinan Kerajaan Negeri Perak dia khuatir takut pengalaman yang di Selangor itu takut berulang kepada negeri Pulau Pinang dan mungkin kita khuatir juga Pulau Pinang hendak air free. They want to get the best tapi tidak runding secara gentleman. Jadi mungkinkah perkara ini, kekhuatiran Kerajaan Negeri Perak untuk bekalan...

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Ini niat jahat ini. Ini niat jahat. Kita sudah kata hendak beli. Belilah.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Bayan Baru, duduk the Honourable Member.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Bukan hendak free water. Apa lah the Honourable Member for Kuala Kangsar ini.

The Honourable Deputy Minister, kita lihat pengalaman di Selangor, kemungkinan Kerajaan Negeri Perak khuatir perkara ini akan berulang lagi.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Khuatir apa? Kita sudah kata beli, bayar dengan duit.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Bayan Baru, duduk.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

The Honourable Member for Kuala Kangsar jangan mengelirukan. Duduklah.

Tuan Ng Wei AikDAP · PRTanjongEN

Kita bukan perompak.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Tidak boleh macam itu, the Honourable Member.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

The Honourable Member, tidak payah menjerit perompak semua.

Dato' Wira Othman bin AbdulUMNO · BNPendangEN

Mr Chairman, dia guna perkataan perompak, Mr Chairman. The Honourable Member itu, perompak.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Saya sudah tegur the Honourable Member, sudah tegur.

Dato' Wira Othman bin AbdulUMNO · BNPendangEN

Dia gunakan perkataan perompak itu.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the loudspeaker]

Dato' Wira Othman bin AbdulUMNO · BNPendangEN

Eh! Tarik balik perkataan perompak itu.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the loudspeaker]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Tanjong...

Tuan Ng Wei AikDAP · PRTanjongEN

Kita bukan perompak.

Tengok.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Tanjong...

Tuan Ng Wei AikDAP · PRTanjongEN

Saya hendak ulang di sini, kita bukan perompak.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Apakah ini the Honourable Member for Tanjong?

Dato' Wira Othman bin AbdulUMNO · BNPendangEN

Agaknya dia sudah gila. Mr Chairman, the Honourable Deputy Minister, tadi the Honourable Member for Beruas cakap bab tidak ada semangat 1Malaysia. Pulau Pinang tidak mahu bayar harga air ke Kedah, apakah itu semangat 1Malaysia?

Dato’ Ngeh Koo HamDAP · PHBeruas

[Bangun]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Tidak boleh macam itu. The Honourable Member tidak perlu hendak jawab. Yang jawab the Honourable Minister, the Honourable Member.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Pembetulan. Itu tadi tidak kata.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yang menjawab the Honourable Minister.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Sejak tahun 2008, memang Penang bersedia untuk membayar untuk air mentah. Memang bersedia... [Interjection] Pay for kepada Perak. Itu satu kenyataan yang tidak betul. Saya hendak jelaskan...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Biar the Honourable Minister jawab.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Memang dalam perbincangan dengan Selangor dan Pulau Pinang, hendak dijualkan air mentah.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

The Honourable Member, saya pun tidak tahu hendak jawab yang mana satu sudah. Banyak sangat. Akan tetapi macam inilah, cerita Pulau Pinang dan Perak ini, cerita mahu kahwinlah. Jadi mahu kahwin ini, kita baik-baik dulu, kita minang- minang baik-baik dulu tapi kalau kita bergaduh daripada awal, memang kita tidak dapat. Jadi elok kalau Pulau Pinang dan Perak duduk sekali, bincang lagi sebab the Right Honourable Chief Minister of Penang ada bagi tahu kata dia tulis surat kepada negeri Perak minta air mentah dan the Right Honourable Menteri Besar Perak pun bagi tahu dia ada menerima surat dari Ketua Menteri Pulau Pinang, tapi sehingga waktu itulah, saya tidak tahu selepas itu. Sehingga kita berjumpa itu di Putrajaya, kedua-dua orang itu, dia orang belum duduk berbincang antara Setiausaha Kerajaan Negeri Perak dengan Setiausaha Kerajaan Negeri Pulau Pinang belum duduk. Yang cakap itu hanya dalam surat khabar. Cakap dalam surat khabar bagi tahu semua tapi yang technical team tidak duduk betul- betul. Ini kerana saya tanya, waktu itu kita ada mesyuarat Majlis Air Negara, the Right Honourable Chief Minister of Penang pun ada, MB Perak pun ada. Jadi saya katakan kepada Ketua Menteri dan MB, lebih baiklah kalau SS Penang dan SS Perak datang dan duduk mesyuarat dan lepas itu baru dapat resolusi itu, baru itu boleh masuk. Sekarang ini just surat-menyurat macam itu saja. Jadi saya haraplah ini dapat diselesaikan di peringkat dua buah negeri ini.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Akan tetapi the Honourable Minister, Mr Chairman, the Honourable Minister boleh panggil mesyuarat kan? Jadi, the Honourable Minister lah step in.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Tidak boleh. Dengar, air mentah hak negeri. Jadi, biar negeri yang minta.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Tak, tak, mediator. Kita minta the Honourable Minister masuk sebagai mediator. Kalau the Honourable Minister boleh masuk mediator Pahang dengan Selangor, apakah pasal double standard Penang dengan Selangor tidak boleh buat?

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

No, no. Selangor dan Pahang the Honourable Member, dalam Selangor dan Pahang, mereka telah bersetuju dulu. Selangor dan Pahang telah bersetuju, baru Federal masuk waktu itu. Okey?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Sudah jelas the Honourable Member. Yang itu jelas.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Okey, saya ingat kalau kita ulang-ulang pun yang itu juga.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Saya terus pergi tadi daripada the Honourable Member for Petaling Jaya Utara tanya tadi pasal harga- itulah, gaduh sampai hilang dah. Kos terowong RM1.3 bilion. Langat II RM993 million. Itulah dua yang ditanya tadi. Okey, saya terus pergi yang seterusnya mengenai dengan Sabah. The Honourable Member for Putatan, suka saya memaklumkan the Honourable Member, saya ingat the Honourable Member ada dalam rekod itu bahawa kita untuk Sabah dan Sarawak, untuk bekalan air, Kerajaan Pusat menghantar peruntukan itu kepada kerajaan negeri di bawah JKR air negeri. Begitu juga di Sarawak. Jadi maknanya semua procurement tender, projek yang hendak ditentukan, ditentukan di peringkat JKR air negeri. Macam tahun hadapan 2015, sejumlah lebih daripada RM300 juta yang akan dihantar ke Sabah. Jadi saya kira bahawa the Honourable Member, kita sebagai di peringkat kementerian boleh membantu sahaja tapi urusan set projek, mana hendak buat satu itu, dibuat di peringkat negeri.

Terima kasih Mr Chairman. Saya rasa kalau saya tidak silap the Honourable Minister, the Honourable Minister sendiri telah pun turun juga di bawah soal Kaiduan catchment ini yang mana ada bantahan daripada penduduk-penduduk yang mana berjumlah 200 buah rumah di Kaiduan dan tiada rancangan. Saya rasa the Honourable Minister sedar ini, Menteri dari Persekutuan sedar bahawa rancangan itu haruslah diambil kira penempatan itu terlebih dahulu sebelum diumumkan supaya orang-orang tidak begitu terkejut dengan cadangan untuk membina satu empangan di Kaiduan. Ini diperlukan sebab dalam masa 10 tahun kita agak kekurangan air ini termasuk kawasan rumah Mr Chairman itu, mungkin dalam masa 10 tahun kita tidak cukup air. Tidak adakah perancangan yang terdekat ini untuk menangani masalah NRW ini? Ini saya rasa bukan sahaja tanggungjawab kerajaan negeri tapi juga Kerajaan Pusat pun perlu membantu kerajaan negeri soal NRW ini yang telah pun dijawab oleh the Honourable Minister semasa menjawab peringkat dasar dulu. Jadi ini saya rasa the Honourable Minister harus sedar juga ini. Bukan kita serahkan kepada kerajaan negeri saja.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Untuk Empangan Kaiduan itu saya bersetuju dengan the Honourable Member for Putatan bahawa sebenarnya kita kena tengok secara holistik. Maknanya kita kena buat penyelesaian juga kepada penduduk-penduduk yang ada, yang tinggal di situ dan serentak dengan design empangan.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Jadi, saya ambil maklum the Honourable Member dan saya akan bawa sekali lagi dalam jawatankuasa berhubung dengan pemindahan penduduk, itu pada saya penting. Keduanya, fasal NRW tadi, saya hendak maklumkan kepada the Honourable Member bahawa di kawasan Kota Kinabalu, untuk penggantian paip-paip lama, diperuntukkan sebanyak RM78 juta pada tahun depan. Terima kasih... [Interjection] Itu termasuk Putatan, termasuk Putatan 'bah'. Okey, yang seterusnya Mr Chairman, saya pergi kepada hal yang dibangkitkan oleh the Honourable Member for Parit Buntar yang ada kaitan di sini iaitu mengenai dengan green technology dan ada kaitan dengan kehidupan manusia pada masa yang akan datang, yang ada kaitan juga dengan yang dibangkitkan oleh the Honourable Member for Parit Sulong yang berkaitan dengan Malaysian Green Technology Corporation dan juga Dasar Teknologi Hijau. Jadi sukalah saya sebut di sini bahawa dalam program yang berkaitan dengan kesedaran mengenai dengan green technology ini ada dua buah komponen. Satunya ialah green technology, dengan izin dan satu lagi ialah green growth, dengan izin. Jadi dalam usaha ini, dalam usaha memahami, memberi kefahaman kepada masyarakat berhubung dengan pentingnya masa depan daripada segi green technology ataupun kehidupan hijau ini, kementerian telah mengambil beberapa daya inisiatif. Pertamanya, kementerian sendiri menubuhkan Malaysian Green Technology Corporation iaitu sebuah agensi kerajaan yang untuk melihat secara keseluruhan apakah yang boleh kita lakukan yang berkaitan dengan green technology ini termasuklah hal yang berkaitan dengan tenaga yang boleh diperbaharui atau renewable energy, dengan izin. Kemudian, EE ataupun Electric Energy Efficiency, dengan izin, kemudian, EV ataupun Electric Vehicle, dengan izin dan juga komponen-komponen lain yang kesemuanya itu boleh memberi kehidupan, kesejahteraan kepada manusia sejagat pada masa yang akan datang.

Dato' Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Dalam hal ini, the Ministry of Energy, Green Technology and Water (KeTTHA) bekerjasama dengan the Ministry of Education untuk memasukkan environmental sustainable development di dalam syllabus dan juga subjek di peringkat sekolah. Elemen-elemen teknologi hijau seperti tenaga yang boleh diperbaharui, kecekapan tenaga dan produk eko dengan kerajaan telah jadikan subjek kredit di peringkat universiti khususnya dalam bidang yang ada kaitan dengan alam sekitar, reka bentuk dan juga arkitek. KeTTHA juga bekerjasama dengan Department of Skills Development, Ministry of Human Resources di dalam membangunkan modul latihan yang berkaitan dengan teknologi. Pada masa yang sama juga, sepertimana the Honourable Member sedia maklum bahawa the Right Honourable Prime Minister dalam persidangan di Copenhagen pada tahun 2009 telah mencadangkan sasaran lebih kurang 40 peratus pengurangan intensiti pelepasan karbon berbanding dengan paras 2005. Jadi, Malaysia telah berusaha melalui kementerian dan juga agensi-agensi yang lain, bukan sahaja di KeTTHA tetapi di kementerian-kementerian lain juga untuk memberi satu sasaran yang boleh disasarkan sepertimana yang telah ditetapkan. Usaha-usaha ini akan diteruskan dalam banyak sektor dan banyak komponen tetapi yang paling penting saya bersetuju dengan the Honourable Member for Parit Buntar bahawa kita juga hendaklah sedia untuk melahirkan tenaga-tenaga yang mahir dalam teknologi hijau. Jadi salah satu daripada komponen untuk melahirkan kumpulan yang cekap dalam teknologi hijau ini kita juga bekerjasama dengan agensi atau institut di luar negara bagi memastikan bahawa ada penyertaan kita dalam apa juga bentuk pengajian yang berkaitan dengan teknologi hijau. Pada masa yang sama kita juga menggalakkan pengusaha-pengusaha tempatan menyertai program-program yang ada kaitan dengan hijau.

Tuan Er Teck HwaDAP · PRBakri

[Bangun]

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Seterusnya yang sama juga the Honourable Member for Parit Sulong dan juga the Honourable Member for Parit Buntar ...

[Bangun]

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Bercakap pasal IGEM. IGEM ini adalah salah satu daripada usaha kerajaan sebagai flagship yang telah dimulai pada tahun 2010, menganjurkan satu pameran dan juga persidangan untuk memberi peluang kepada ahli-ahli perniagaan dalam negeri dan luar negeri membawa produk-produk masing-masing. Suka saya sebut di sini bahawa IGEM yang baru berlangsung pada bulan Oktober, kita telah membawa 357 buah syarikat dan organisasi tempatan iaitu sebanyak 71 peratus dan 29 peratus adalah daripada syarikat-syarikat luar negara daripada 21 buah negara dan penyertaan keseluruhannya 616 booths pameran. Pengunjung yang datang ke IGEM sebanyak 49,812 orang daripada keseluruhan yang direkodkan di situ adalah dari 52 buah negara dan paling ramai adalah rakyat kita, rakyat tempatan.

Tuan Er Teck HwaDAP · PRBakri

[Bangun]

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Transaksi jumlah perniagaan di situ RM1.9 bilion dan ada tujuh memorandum of understanding yang telah pun kita dapat tandatangan. Tahun hadapan, IGEM 2015 akan diadakan pada 9 September hingga 12 September 2015 juga di KL Convention Center. Akhir itu mengenai dengan ...

Tuan Er Teck HwaDAP · PRBakriEN

Honourable Deputy Minister, before it ends. Give the Honourable Member Bakri the opportunity to ask one question, because earlier he was unable to ask a question.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Okay. It's not over yet.

Tuan Er Teck HwaDAP · PRBakriEN

[Laughter] Okay. Thank you, PhD Datuk Seri, Mr Chairman, and... [Interjection] The Deputy Minister gave the opportunity to the Honourable Bakri...

[Dewan riuh]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat.

Tuan Er Teck HwaDAP · PRBakriEN

Here I want to ask the Deputy Minister one important question.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, although he is polite and good, he must ask about the topic that the Honourable Deputy Minister is clarifying, yes, Honourable Member.

Tuan Er Teck HwaDAP · PRBakriEN

Certainly. About energy and technology. I ask the Deputy Minister to provide statistics relating to the number of homeowners who have applied for the installation of photovoltaic solar (PV) panels, and how many households have joined this programme? Please provide this figure broken down by state and by the kilowatts generated. According to news reports a few days ago, a fraud syndicate has used schemes related to renewable energy, including electricity saving cards and fake Feed-in Approval Holder certificates. It is believed that hundreds of victims have been cheated by these fraud schemes. I have also been informed that under this FiT scheme, the Feed-in Approval Holder licence with permit, or FiAH, is only granted to a few specific companies. I ask the Deputy Minister to explain why the FiAH licence is not open to all companies that wish to take part in this scheme? So far, FiT applicants have had to wait a long time to obtain the FiT quota. One of the causes is that only a few FiAHs are permitted to carry out installations. By opening licence applications to companies interested in this field, it would not only prevent fraud but also give small-capital companies the opportunity to contribute in this field, the green energy field. Finally, I ask the Deputy Minister to provide the revenue collected from the additional 1 per cent charge on electricity consumers for the Renewable Energy (RE) Fund from 2012 until now. Please give an explanation and an answer. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, the answer should be written, Honourable Member.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

The detailed figures, Honourable Member, I want to give them in writing, because every house would have to be counted from Johor all the way to Perlis. However, I can tell the Honourable Member that this fraud does exist. Last week I was in Penang. This fraud happened: they pretended that SEDA was organising a seminar on how to obtain the quota of kilowatt hours, 12 kilowatt hours, 7 kilowatts, 10 kilowatt hours. They held it in a hotel, there was SEDA's logo put up, and then there were 1Malaysia - Malay, Chinese, Indian. The Malay was said to be a government officer, because it is customary to say so. The Malay was said to be a government officer, so the Malay would speak as a government officer. The Chinese one would act as the service provider, and after that there was also one lawyer. The Indian was the lawyer. So, three were there. The Malay would say, "This is the government, SEDA does this and that," and then the Chinese one would say he is the service provider and can install however many, at what price per kilowatt hour. The Indian would say, "I can sign the agreement." In the report given now, about RM500,000 has been collected from the public. The latest case was in Bukit Mertajam. I do not know which hotel, but a hotel in Bukit Mertajam. So, there was a person who brought me in Seberang Perai, who showed how his cheque receipt was paid to- This matter has become a police case and the police are investigating the action taken. Finally, before moving on to the other energy, I want to inform the Honourable Member for Parit Sulong about this MyHIJAU. Currently there are 3 scheme developers that have joined the MyHIJAU programme: the SIRIM Eco Investment Scheme, which is based on ISO14000 criteria, then the Energy Efficient Labour Scheme by the Energy Commission, and thirdly the Water Efficient Product Scheme under the National Water Services Commission (SPAN). Based on fluoride as the main criterion. Products that receive certification recognition under these three schemes are eligible to use the MyHIJAU logo. That is about green technology, and finally on green technology...

Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Jelebu, please stand, Honourable Member.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Ya, ya.

Thank you, Mr Chairman. I want to ask, perhaps when the Honourable Minister answered earlier I was not in the House, has my question been answered about the Triang water project in Negeri Sembilan, in Jelebu?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

I did not answer earlier. I thought there was none earlier, I did not answer.

Terima kasih.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

This needs to be looked up. If we cannot find it, we will just give a written answer. Oh, he has gone to the toilet. We cannot find it, wait a moment, I cannot find it. Later we will find it and answer. There is, they did give an answer earlier, but I have too many matters, so maybe I put it in the wrong place. So, let us move on to the energy sector, finally. So, there are many related matters here, there is this, Jelebu is here. This is Jelebu. Status of the Triang water supply project. Status of project progress as at 31 October 2014 is 98 per cent, and it is expected to be fully completed in 2015. The total cost of the Triang water supply project is RM488 million. The water supply system consisting of the dam, treatment plant and distribution system, the dam component is handed over to the state government, taking into account the resources under the state government's jurisdiction. The treatment plant and distribution system are handed over to PAAB, the treatment plant and distribution system are handed over to PAAB and operated by SAINS. That's all.

I want to ask a little, Mr Chairman, Honourable Minister. I received the same answer a year ago, on 1 October 2013 - also 98 per cent, with only 2 per cent left. May I know what the reason is that these 2 per cent truly cannot be resolved, 98 per cent can be completed, but the 2 per cent cannot be completed. I know there are 5 packages in the overall project. This has no relation. So, I ask for an explanation, why is this 2 per cent so difficult? If the assistance of the Honourable Member for Jelebu is needed, I am ready to help resolve it, if it involves villagers and so on. This is important, Honourable Minister, it has been a year with the answer 98 per cent. I fear this answer is not correct. Thank you.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

I want to ask the officials to prepare a report, I will answer the Honourable Member shortly. Tonight we will answer, no need to wait if there is anything that needs to be done. Ill-intentioned. Okay, let us go to the energy sector. Oh, there is more, Tebrau. Do we still want to answer about this rainwater matter? Okay, let us answer a little, there is more. This is about the rainwater harvesting system. This matter has been included as one of the conditions in medium-cost housing projects, bungalows, under the Uniform Building By-Laws under the supervision of the Ministry of Housing and Local Government. KeTTHA encourages the application of rainwater harvesting systems as it reduces dependence on treated water consumption and supports green initiatives and technology and green buildings. On the government's side, in Putrajaya six ministries have been proposed for this initial stage, including the KeTTHA building and the Parliament building, with the purpose of using this rainwater for landscaping and also for watering plants. That is what the government has done so far, but we encourage it to be fully used by the private sector and also government agencies. For the energy sector, I think the 1MDB question has been answered largely by the Prime Minister's Department... [Interjection] Wait a moment, I have not finished speaking. So, on the matter of projects. First, regarding 3B, the Honourable Member for Petaling Jaya Utara mentioned earlier about rejecting YTL. So, here I would like to mention that the award of this project was given to 1Malaysia Development Berhad based on the following factors. First, YTL did not comply with the technical criteria set out in 42 or in phase 2 of the RFP document, which specified the steam generator or boiler. The manufacturer of the steam generator was permitted by the technical committee for the 3B bid on the basis that the temperature offered in the bid must not exceed the existing temperature and the manufacturer. What YTL offered was an unproven technology temperature, namely a higher temperature.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Therefore, the government's decision to offer the project to 1MDB was correct, because 1MDB offered the package as required. Then, regarding the award of the 2,000 megawatt power generation project, it had to be made now to 1MDB even though the plant construction period, as the Honourable Member mentioned earlier, is 4 years from now.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

This is because the new transmission line that can export 2,000 megawatts from this location needs almost six years to be completed. Without the new transmission line, this 2,000 megawatt power plant cannot begin operations. Okay, that is my answer, Honourable Member.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

I do not think I want to go into details. I only have one question, the core question, which is why was the policy of open tender changed back to direct negotiation? Direct negotiation, done hastily. Nobody knew the project would be offered, and then news came out that it had been offered to 1MDB. After that, the ministry replied that although it had been offered, the date and all conditions had not yet been set. Why was the offer made before negotiations were carried out?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Honourable Member, 1MDB is a government company. I must - When I say Honourable Member, you laugh. This is because when the name 1MDB is mentioned, a very negative perception is created. We cannot do it like that, Honourable Member. Because, please believe that 1MDB is a government company. Whatever is in it, of course it is related to tariffs, related to anything, which in the end we know will not lead to a burden on the people. We know this, because when the word 1MDB is mentioned, there seems to be a stigma that can seemingly affect, can give a very wrong, very bad picture. So, I ask that we adopt a good mindset. Back to the tender, open tender, selective tender, open tender and direct nego. In my view, Honourable Member, that is in terms of what we say in terms of regulations. The regulations do allow it, it is just whether the government chooses to do it at that time. Not all of them we go through, what we do is on direct nego. There is still selective tender, there is still open tender, and there is still what we do through pre-Q for certain projects. So the question now is, the government has given this project to 1MDB and 1MDB must complete this programme according to the schedule that has been set. Does any Honourable Member want to...? That is fine, that is enough. I also understand the Honourable Member for PJU is not yet satisfied, but I think...

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

Honourable Minister, indeed I am not satisfied, but I do not want to prolong this matter.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Thank you. Then, secondly, I want to raise the matter concerning the Honourable Member for Sandakan. The Honourable Member for Sandakan raised the matter concerning the plant. Another matter raised by the Honourable Member for PJU earlier, let me explain to the Honourable Member that the 1MDB statement regarding Sandakan and Tawau is a statement from 1MDB. Only a statement from 1MDB. Up to now, up to today, the ministry has only just decided, how many megawatts in Sandakan? We have decided how many megawatts in Sandakan and how many megawatts in Tawau. We have not appointed any contractor or any developer to develop the IPP again, Honourable Member. That is a valid statement issued by the KeTTHA ministry.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

I just want to make a clarification.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Ya.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

So, basically the 780 megawatt hydro programme and another 400 megawatt gas turbine have indeed not yet been awarded to any party, and can the Minister explain what method, what way...

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

The figure the Honourable Member mentioned is also not correct.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

It's all right. What I read...

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Okey, okey.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

What I read. I only want confirmation from the ministry.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Okey.

Tuan Tony Pua Kiam WeeDAP · PHPetaling Jaya UtaraEN

No offer has been made by the ministry. That is number one. What method will be used to offer the contract?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

First, regarding the 700 megawatts and the 400 megawatts, let me inform you that for Sabah we do not need 1,100 megawatts more. There is no need, because we have just completed the Kimanis Power Plant and the SPR Power Plant at Kimanis, 400 megawatts. It has just begun operating. Only what we want now is on the East Coast of Sabah, in Sandakan, in Tawau and also in Lahad Datu. The packages to be offered to Sandakan, Lahad Datu and Tawau, and also the hydro which will be given about 180 megawatts, the whole of that I will inform the Honourable Member later, because I also cannot yet confirm how the government will proceed in future. So there is, if I am not mistaken, approximately 60 megawatts in Tawau, 30 megawatts in Lahad Datu and 90 megawatts in Sandakan.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, if you are not sure, there is no need, Honourable Member.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Ya.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

They will quote that.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Good. Okay. Then I want to talk about Sandakan. The Honourable Member for Sandakan said earlier that the Honourable Member for Sandakan used the word 'robbers' for SESB. I think it is not very appropriate. Even if angry, do not use the word robbers, use another word, because when you say robbers, it is as if SESB is very wicked. So for SESB for Sandakan. First, I want to mention here the projects for next year, 2015 to 2020. So there is already a list, Honourable Member, which has been released, including in Sandakan. I can give the Honourable Member a guarantee that next year, these projects will be tendered. Then we will give them to the winners to carry out the projects, especially those related to SAIDI. There is a budget that has been set for SAIDI in the state of Sabah.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, is there more, Honourable Member?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

A little more. A little.

Mr Chairman, regarding that SAIDI, can the Honourable Minister explain why SAIDI this year is higher than last year? The Honourable Minister, who always promised that we want to reduce SAIDI so as to supply electricity to us, but SAIDI this year has reached the level of 700, when last year it was just over 400. So how is that?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

KeTTHA - Yes, yes...

Every day, just for your information, if the Honourable Minister is not in Sabah, passing through Sandakan every day, Sandakan must have electricity disruptions.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

I am aware, Honourable Member, I am aware of that matter. Firstly, the Honourable Member mentioned earlier about- now from Kolopis Penampang there is a transmission line at the Crocker Range, in the mountains going up to Ranau, down to Telupid. Kolopis - sorry. From Kolopis going to Sandakan, to Segaliut in Sandakan, it is about more than 400 kilometres, and it only carries 100 megawatts. Now we are upgrading Segaliut in Sandakan to 200 megawatts.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

At the same time, that is why there is a problem on the East Coast, because if only 100 megawatts can cross the, with respect, Crocker Range, it cannot. The Honourable Datuk Seri, Member of Parliament for Beluran, will not get it, and there are still places that truly do not have electricity supply. So in Sandakan, from Segaliut we will bring it to Seguntur and we will also bring it to Nangoh.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Nangoh.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Nangoh. So the meaning is to bring that, but we still do not have enough. We also have to build power plants in Sandakan, in Tawau and in Lahad Datu as additional capacity. Okay?

One more thing I want to ask. It is as if Sandakan reduces its power because the IPPs there, often they do not take up duty at full capacity. Like at Libaran, we have about 60 megawatts. However, we have learnt that often only one or two engines run, only 30 or so. So how is it that these IPPs often break down, as if there are no penalties, or are these IPPs given leniency? It seems they are hesitant to repair their engines. That is the problem.

Okay. I have noted what the Honourable Member said. Okay, then the last point from the Honourable Member concerns geothermal. Geothermal is one of the components of renewable energy. Within renewable energy there is solar, there is biogas, there is biomass, there is wind turbine, there is wave energy and also geothermal. Geothermal already exists in Indonesia and in New Zealand because they have many volcanic lava flows. However, when studies were done, Tawau in Sabah also has potential, not just potential, it is indeed feasible to build geothermal in Tawau. So a company has submitted an application to the government to start a project called the Geothermal Power Plant at Apas Kiri, Tawau. It now complies with all applicable rules and laws. The company has been directed by the state government to build a plant construction site at the company's own cost, called Tawau Green, where all the timber logs the Honourable Member mentioned earlier were removed and subsequently auctioned by the Sabah State Forestry Department. The logs were taken and auctioned by the Sabah State Forestry Department. The Tawau Green company did not receive any reward or profit from the process of extracting timber logs from the Geothermal Power Plant site at Apas Kiri, Tawau. That is my answer. Finally, the Honourable Member...

Mr Chairman, one more question. So this geothermal plan, when can it start? So we have, this has already been raised for several years, you know, but when can this project actually run smoothly? If the feasibility study is already done, so when can it start?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

It has already started, Honourable Member.

Sudah start?

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

It has started, on the ground it has started, it has started. The Honourable Member can visit Tawau later. If not, the two of us can go and visit. The Honourable Member for Ipoh Timur, regarding the action taken by TNB to address cases of meter tampering and proposals for improving the existing SOP. TNB has already taken action against offences relating to meter tampering cases under sections 37 and 38 of the Electricity Supply Act 1990. For meter tampering cases, TNB has implemented improvements to the relevant existing SOP, which were approved by the Energy Commission on 1 June 2014. These improvements have taken into account the interests of both parties, namely consumers and licence holders. Among the improvements implemented is a more prudent approach, namely issuing a notice of meter inspection and testing to consumers. Apart from that, consumers may also obtain a meter inspection report from the licence holder. That is the answer from...

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Although the Honourable Deputy Minister has said that a guideline was issued on 1 June, last week there was still a case in Ipoh where a TNB officer climbed over the fence and simply replaced the meter. Why can this still happen when the Energy Commission has already issued a guideline? So that is why I wish to stand up here: TNB, despite having a guideline, does not follow it at all. I hope the government will take this issue seriously. Many people are affected. Not only in Ipoh, but everywhere in Malaysia. Thank you.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Only in Ipoh, everywhere in Malaysia, that is just a statement. [Laughter] That is just a statement in Malaysia. Okay, we will take note of what the Honourable Member has said and bring it to TNB. So, Honourable Member Mr Chairman, I once again...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Regarding this meter tampering, because in the session... - Thank you, Mr Chairman. In the previous session, the Honourable Minister stated that about 1 per cent, roughly 1 per cent of the new meters installed were defective. So the problem now, as the Honourable Member for Ipoh Timur said, is that many people are receiving notices claiming theft. This is not because of my own matter; my service centre in Pantai Remis, a new building, from the start until now, we have never tampered with anything, and suddenly we receive a letter saying we tampered with the meter. I was also shocked. Therefore, I want the government, if possible, to investigate this issue so that there must definitely be a notice given before the meter- most likely it is because TNB workers tampered with it and then accuse us. That is the problem.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Honourable Member, who would believe the claim of not tampering? Who would believe now the claim of not tampering? So now, if we accuse here, accuse there, it is also difficult...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

What I mean is that to be fair, both parties must have...

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Yes, just say it.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

When the meter was opened.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

If there is tampering, under section 37, TNB must prosecute and prove the tampering. Not like now, where they just issue a notice and ask consumers to pay. That is unfair.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Yes, there are cases where there was indeed real tampering.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

If there was tampering, we support TNB, we do not accuse them. That we do not...

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

There is more tampering than non-tampering. A lot of tampering.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

What is being said is that now, suddenly a notice is received, with no evidence of tampering or modification, and one has to pay. That is the problem.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, Honourable Member, that is enough, Honourable Member.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Never mind, never mind. If there was tampering, we will take action; if there was no tampering, we will not take action.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Honourable Deputy Minister...

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Now, whether tampered or not, the meter is replaced and then a notice is received. That is what is causing the problem now.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Never mind, never mind, Honourable Member. That may be an isolated case, not everyone.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Not isolated, many cases.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Tidak apa.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Not isolated, there are many such cases.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, please finish, Honourable Minister.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Mr Chairman, perhaps the Honourable Minister may not be aware that I, as the State Assemblyman (ADUN) for Sitiawan, have received complaints that during the installation of new meters, TNB workers asked for RM500 each, and then they themselves tampered with the meter before it was installed. So for...

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

That should be reported. If they have asked for money, report it.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, send the report, Honourable Member, send the report to the Honourable Minister.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Hantar laporanlah.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

There are many cases because there is a scheme. What I mean is, TNB must also be responsible for its own workers.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

No need. I think even if the Honourable Member brings it into the House, it will not be settled if it involves individuals or involves constituencies. If there is a list, bring it first, report those first. Rather than shouting here about one or two cases, but it has become like a... We make noise here, actually we go to the policy, it is okay. But this is not a policy, this is a matter relating to the technicians below. So it seems as if we want to blame, our perception is that we want to blame TNB. I think that is not quite right. Not right.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, Honourable Member, please finish, Honourable Member.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

No, we are asking for an explanation. We are not trying to blame TNB.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang Terap

Ini, ini more on...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, that is enough, Honourable Member for Ipoh Timur.

That is just an isolated case.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

TNB says it has the right. How can that be? We are not trying to blame TNB, but the enforcement method. If there is theft or tampering, then indeed those are criminals.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Honourable Member, please sit down.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Ipoh Timur, that is enough, Honourable Member.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Honourable Member, I myself, I myself have my own perception of the Honourable Member for Ipoh Timur. When the Honourable Member for Ipoh Timur speaks, I may or may not accept it because I already have a stigma about the Honourable Member for Ipoh Timur. That is all, very simple.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

Perception. Now let us say evidence.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, that is enough, Honourable Member.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

As for evidence that there was indeed tampering, I support TNB taking action, but under section 37 it is clear why action was not taken.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Bring the report, bring the case. That is enough. Let the Honourable Minister finish. Please finish.

Tuan Ng Wei AikDAP · PRTanjongEN

So TNB is not professional.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

If there is evidence, bring it. If you have evidence, bring it.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

No, the Deputy Minister must understand...

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Thank you to...

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Honourable Minister...

Honourable Minister, share a little more before the Honourable Minister...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Cukuplah.

Tuan Su Keong SiongDAP · PHIpoh TimorEN

This involves a lot of...

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Before the Honourable Minister finishes....

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That is enough, Honourable Member.

Honourable Minister...

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

The clean coal technology I asked about earlier, at Tanjung Bin and Manjung.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Written, Honourable Member.

Kuala Kangsar wants to ask.

One, before the Honourable Minister closes. I did not have the opportunity earlier.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That is under you, Mr Chairman.

Thank you, Honourable Minister and Mr Chairman. Earlier, the Honourable Member for Sandakan did not give me the opportunity to interject about TNB's recent profit of around RM6 billion. I congratulate TNB for providing such high-quality supply to the people and also to industry. So my question is, will TNB provide CSR to the people, especially to Parliament, and also to the people's economy that has been put forward by the government, so that TNB, together with the people, can carry out the agenda? So I hope the Honourable Minister can help TNB provide CSR to us. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Written answer, Honourable Minister.

Tuan Ng Wei AikDAP · PRTanjongEN

[Speaking without using the microphone]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Is there some problem, Honourable Member for Tanjong? Please, don't be like that, Honourable Member for Tanjong.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

A Member asked, please don't be angry, Honourable Member for Tanjong. This is Parliament.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, Parliament. Don't be like that.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

We cannot be emotional. We must stay steady. We may be angry, but we must still stay steady [Laughter]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That is enough, Honourable Member for Tanjong, please sit down.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

For the Honourable Member for Hulu Langat regarding this Clean Coal Technology, I am happy to state that indeed at Tanjung Bin and Manjung, their carbon emission technology and the plant there use what is called modern FGD, whereby pollution that can cause acid rain can be avoided. In terms of carbon emissions, the plants at Tanjung Bin and Manjung have nearly reduced carbon emission rates per unit generated by 12-15 compared with the Kapar plant. That is the answer. The others have further answers here and can be answered in writing, Honourable Member, they are here. So Mr Chairman, I thank everyone...

[Bangun]

Mr Chairman (Datuk Seri Dr.Ronald Kiandee)EN

That is enough, Honourable Member.

The CSR just now, when the energy sector made a profit of RM6 billion.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

Insya-Allah, we can see, Honourable Member. So thank you, be patient, Honourable Member, the Honourable Member can stay until 9.30 pm.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

There are other ministries coming in, Honourable Member.

Dato’ Seri Mahdzir KhalidUMNO · BNPadang TerapEN

I will just be brief, everyone wants to go home. I know that. Thank you, Mr Chairman. Thank you to all Honourable Members who took part, from the government side and also from the opposition side, who have discussed much related to the KeTTHA ministry. So I thank you very much for the debate just now.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Thank you, Honourable Member. Honourable Members, the question is that the sum of RM280,970,000 for Purpose B.29 under the Ministry of Energy, Green Technology and Water (KeTTHA) form part of the Schedule be agreed to. [Question put and agreed to] [The sum of RM280,970,000 for Purpose B.29 ordered to form part of the Schedule]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The question is that the expenditure of RM2,585,567,600 for Purpose P.29 mentioned in the Development Estimates for the year 2015 be approved. [Question put and agreed to.] [The sum of RM2,585,567,600 for Purpose P.29 approved as part of the 2015 Development Estimates]

Bill — Supply Bill 2015 Second Reading and Development Estimates Motion 2015 Committee — Head B.47 [Schedule] - Head P.47 [Development Estimates 2015] -Bill

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Supply Head B.47 and Development Head P.47 under the Ministry of Communications and Multimedia are open for debate. The Honourable Member for Parit Sulong.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Thank you, Honourable Member for Putatan, please sit down. This is brief.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Putatan, please sit down.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Just one, this Item 33000 concerning MDeC. I only want to ask MDeC what action it has taken and what it will do, because last year, in the budget announced by the Right Honourable Prime Minister for 2014, there was a programme called Get Malaysian Business Online which provided assistance or special allocation to online entrepreneurs of RM1,000 to each entrepreneur. This programme is indeed very encouraging. So I want to ask the ministry, because of the absence of this special allocation, and now the percentage of those directly involved in online business is increasing every day.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

So I want to ask the ministry what other action has been taken by the ministry in an effort to help entrepreneurs doing online business. Next, I also want to ask the ministry what new approach has been taken by the ministry besides helping online entrepreneurs in general. I also want to ask the ministry, does the ministry have a specific programme to help entrepreneurs related to IT, namely women entrepreneurs from among women? What kinds of programmes are arranged by MDeC? Next, I also want to ask whether MDeC has conducted a study on the effectiveness of all the programmes arranged under MDeC in helping entrepreneurs, especially I want to ask about the effectiveness of the programmes or assistance that has been given by MDeC to online entrepreneurs under the GMBO programme. Finally- I heard people talking, a loud noise, on my left and right.

He is interested in that.

Dato’ Noraini binti AhmadUMNO · BNParit SulongEN

Next, Mr Chairman, I also want to ask whether the ministry has also conducted a study on the impact of online business in Malaysia as a result of the ministry's assistance, especially the assistance given by MDeC to these entrepreneurs. Thank you very much.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Rasah.

Tuan Teo Kok SeongDAP · PRRasahEN

Thank you, Mr Chairman. I refer to Item 060000 – Special Affairs Services (JASA). Mr Chairman, here I wish to draw the attention of this august House that recently we found that as many as 46 JASA officers in Negeri Sembilan have applied to become Assistant Registrars of Voters, and I refer to the allocation provided to JASA, namely RM21,718,100 for next year. Here I want to ask whether there is a strong possibility that the income of JASA officers in Negeri Sembilan is insufficient. I also want to ask, in fact, how many officers in JASA, regardless of senior officers or officers throughout Malaysia, how many of them are political appointees? Because we have also noticed that when Pakatan Rakyat held programmes, held ceramahs, we saw that there were people or parties who hid at the side, filming and taking notes. I want to ask the ministry, in fact the work of JASA officers clearly overlaps with the Special Branch of the PDRM. At the same time, if this government is saving administrative costs, this overlapping work should not happen, and I request the ministry to give an answer and explanation in this august House. The second point, I refer to Item 090100, namely BERNAMA. On 13 November, BERNAMA issued a report stating that the Ministry of Education was reported to be planning to conduct a study to end vernacular schools on 13 November. On 14 November, BERNAMA issued a press statement that BERNAMA apologised for the mistake and misunderstanding in that report. I feel that BERNAMA is a very important news source in this country and should report news prudently. Regarding the issue of ending vernacular education, it is indeed viewed seriously and it is not something to be spread so carelessly as untrue news. I feel sympathy for the Second Minister of Education, because after the BERNAMA report on 13 November stating that the government would study closing vernacular schools, he, the Honourable Second Minister of Education II, was attacked by his own friends from MCA.

Tuan Teo Kok SeongDAP · PRRasahEN

Here I request BERNAMA to explain what action has been taken against the parties who made this irresponsible report? That is all from me, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Putatan.

The Honourable Member for Seputeh, there will be an opportunity later. After me, perhaps Mr Chairman will give it. Thank you, Mr Chairman. I will only be brief, there are 20 items within the time... [Interjection] Development Head P.47 Item 06000 – Construction of District Information Office Building; Item 06111 – Development of the Bernama TV System; Item 30000 – Emergency Call Service Project (PPK); Item 31000 – Broadband Project; Item 33000 – Multimedia Development Corporation (MDeC); Item 34000 – MYNIC Berhad; and Item 45000 – Information Technology Development. If possible, let me finish. I will try. Mr Chairman, the ministry's intention to allocate for the construction of this district development office is greatly welcomed, because if we look at the situation of information offices in all districts, especially for the states of Sabah and Sarawak, they are really very much needed, Mr Chairman. I hope, although with the amount of only RM5 million, this may not be sufficient. So I have already looked at this matter on a macro level; this must be strengthened further so that explanation and information to the grassroots people is more frequent and better compared with what is happening now. This is very important because what happens and is spread on social media is very viral, as played up by the Honourable Member for Seputeh and the opposition, all of them. So, we must explain...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Tenom rise, the Honourable Member for Putatan,

Datuk Raime UnggiUMNO · BNTenomEN

Honourable Putatan, may I interject briefly.

Baru mukadimah.

Datuk Raime UnggiUMNO · BNTenom

Mahu menyokong.

Okey, okey

Datuk Raime UnggiUMNO · BNTenomEN

Thank you. Honourable Putatan must give his own. Thank you, Mr Chairman. Do you agree, Honourable Putatan, that if Honourable Putatan said just now that our information offices' buildings need to be upgraded or renovated, as well as the equipment in the information offices. For example, in Sabah and Sarawak we need new four-wheel vehicles. If I look at Tenom as an example, it is pitiful, the four-wheel vehicles break down every day. So we ask that the ministry also look at the facilities, especially for us in Sabah and Sarawak, so that information services can reach all the corners of the villages, especially in Sabah and Sarawak, where the roads are really terrible. Do you agree, Honourable Member Putatan?

Agree 102 per cent. Put it in my speech. I hope the Honourable Minister can respond to the speech of the Honourable Tenom just now. So, that is the only thing we need to deal with, where we see the opposition's game very active on social media criticising the government. So we must go down to the grassroots to clarify what actually happened so that our people are not confused.

So, regarding vehicles, equipment and office tools, please give a little to Sabah and Sarawak, Honourable Minister. Don't be too stingy. Don't give second-hand ones. If second-hand cars are always given, we are disappointed. Don't make us disappointed. Second-hand items should not be sent to Sabah. This is very important. Mr Chairman, the role of BERNAMA TV is greatly welcomed, because this is the media's effort towards rural areas. But the problem is that sometimes we cannot receive television broadcasts, which should also reach rural areas. The problem we have is that our broadband is insufficient; sometimes there is no coverage in rural areas. Even areas near the towns sometimes have no coverage. I humbly request the Honourable Minister's side to improve broadband services. Briefly, regarding MYNIC, Malaysia Network Information Centre Berhad, which was incorporated in 2006 under the Ministry of Science, Technology and Innovation (MOSTI). So we see the role of MYNIC. I want to know, how many were registered under this company? Although it is only eight classes, we want to know how many registered locally? The allocation totalling RM6.2 million is for what? I think this is a Berhad company, so why does this ministry give an allocation to a company? Is this company owned by the government? I expect an explanation there, because we do not want other companies to ask why this one company was given an allocation and why another company of the same kind was not given one. So which is right, and which is not right? I ask for a little explanation on that. On IT development, I ask the ministry to also bring these programmes down to the district level so that these programmes are strengthened and expanded. Not just at the state level or in the towns only; if possible, to the village corners. Run programmes on what the government is doing, government policies, for example programmes to be implemented in certain places for the benefit of all the people. This is very important because sometimes young people no longer read newspapers, no longer watch television...

Mr Chairman (Datuk Seri Ronald Kiandee)EN

You may wind up, Honourable Member.

...But constantly playing with their handphones and so on.

[Speaking without using the microphone]

Mr Chairman, who asked me to wind up?

Mr Chairman (Datuk Seri Ronald Kiandee)EN

Yes, finish up, Honourable Member.

I think it's the Speaker over there. This is apek's Speaker [Laughter]. There is also apek's Speaker here, Honourable Minister. But never mind, since I heard Mr Chairman's voice just now telling me to wind up, I will wind up and I ask to support. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Ronald Kiandee)EN

There is one more minute. Yes, Honourable Beruas.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Thank you, Mr Chairman. There is only one matter I want to raise under Item 030000 – Communications. We certainly intend to have the best communication system, but unfortunately, cable theft is a very serious matter, at least in my constituency. In Ayer Tawar, Taman Dinding and Taman Semarak Jaya, there has been no telephone or internet service for a month because the cables have been stolen. Almost all of Setiawan now also has no telephone or internet line, because the stolen cables are difficult to reinstall as it is now the rainy season.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

So the problem is, the police are indeed not effective in this matter. I don't think it is that they cannot be effective. If they can act as they did to close all the gambling machine shops recently, after the IGP gave the order, we can see the effect: almost all the gambling machine shops have been closed. If the government can use intelligence, the special branch, then we need not follow these opposition politicians. Reduce some and use the other half of this manpower to gather intelligence on who stole these cables. I am sure it will reduce this problem. But what is important regarding the Ministry of Communications and Multimedia, I want to raise one matter. I learned from internal information at Telekom that they are also fed up with the old method. They have proposed that fiber optic be used instead of copper cable, because of copper cable theft: thieves can sell it at a good price, and that is why the theft keeps recurring. I want to ask, it is understood that because Telekom wants to use fiber optic, there is objection from a group of politicians regarding the use of this fiber optic. Is it because it will cause losses to cronies or suppliers linked with UMNO-Barisan Nasional, so that the plan has been abandoned?... [The House is noisy] I want an explanation. It is understood that since the beginning of 2014 the plan had been drawn up, but was stopped because of objections from certain parties. I want to know whether this is true, and I want an answer. That's all, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Lenggong.

Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Continue tomorrow, Honourable Member.

Continue tomorrow. [The sitting resumed] [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) presiding

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Members, the sitting of the House today is adjourned until 10 a.m., Wednesday, 19 November 2014. Thank you.

[The House adjourned at 9.32 p.m.]