Dewan Rakyat · 16 November 2016

15th Parliament, session 4, meeting 3 · 988 turns · 70,902 words · official PDF ↗ · Digital Hansard ↗

863 of 988 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) presided over the Sitting]

Oral Answers to QuestionsQuestions

Ahmad Nazlan bin IdrisUMNO · BNJerantut · questionEN

1. Dato' Haji Ahmad Nazlan bin Idris [Jerantut] asked the Minister of Natural Resources and Environment to state whether the ministry is aware that coral reefs are important for the breeding and nursery of marine life, tourist attraction and so on. In this regard, the ministry is requested to explain further the efforts being carried out to restore coral reef areas destroyed by coral bleaching and areas destroyed by human activities.

Datuk Ir. Dr. Haji Hamim bin SamuriUMNO · BNDeputy Minister of Natural Resources and Environment · LedangEN

Mr Speaker, thank you to the Honourable Member for Jerantut. The Honourable Member for Jerantut liked to ask, and here is the answer [Laughter]

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

That is only a half-pantun.

Mr Speaker, efforts to conserve natural resources and the environment are a main agenda that the government always gives attention to through the Ministry of Natural Resources and Environment. To protect marine biodiversity in our country, the government established the Marine Department of Malaysia (JTLM) in 2007 to manage, protect and conserve these marine protected areas. Various initiatives have been implemented, among them providing guidelines, management plans, conservation programmes and so on to ensure the wealth of the nation's marine resources is protected and preserved. The first meeting of the National Biodiversity Council (MBN), chaired by the Honourable Deputy Prime Minister on 22 October 2013, approved the proposal for a coral restoration project on islands throughout the country, presented by this ministry. The coral restoration project on islands throughout the country is part of the efforts to conserve marine biodiversity. This coral restoration project aims to rehabilitate coral reef areas facing damage. At present, the Department of Marine Parks Malaysia is actively taking action to implement the programme. Since the start of this project, a total of 32,498 nubbins have been planted by JTLM in states with islands and marine parks, covering a total area of 2.7 acres. Reports received show that the corals are growing between 0.4 cm and 1.4 cm per month. JTLM has also received a development allocation of RM1.55 million, a little but okay, for the Eleventh Malaysia Plan to continue this project under the scope of restoration and rehabilitation of degraded areas. In addition, JTLM also provides facilities such as buoys, mooring points and so on to reduce the rate of coral reef damage caused by tourism activities.

Enforcement activities are also carried out to control intrusions in the waters of marine park areas by enforcing the Fisheries Act 1985. The Communication, Education and Public Awareness (CEPA) programme is also actively carried out by the department to raise public awareness of the importance of conserving marine biodiversity. That is all. Thank you.

Thank you, Mr Speaker. Thank you to the Honourable Deputy Minister for giving the answer just now. Mr Speaker, the effects of El Niño warming can cause 90 per cent of our coral reefs to be affected. Moreover, when the sea water temperature rises to 31 degrees Celsius for two weeks, it will cause bleaching of our corals. My question is, this issue of coral bleaching, which is still rampant as a result of the rise in sea surface temperature, requires cooperation from various parties. So what is the role of the community and the cooperation of various government agencies in overcoming this coral bleaching issue and in ensuring the sustainability of marine biodiversity in Malaysian waters? Thank you.

Mr Speaker. Thank you to the Honourable Member for Jerantut. Jerantut asks as if he is also an expert. It is quite difficult to answer. But we, I mean we share the sensitivity of this marine biodiversity, whose functions are very great. Of course, Mr Speaker, cooperation from all parties is needed. Therefore, the first step, the important first step being carried out, is public awareness of the understanding, appreciation and functions of marine biodiversity itself, such as being the largest oxygen supplier in the world, the food supply for marine life, and the food source for fish, which is a source of protein for humans. That is understanding that needs to be shared together, and also about its great value to the tourism industry. So regular monitoring continues together. Therefore, there needs to be restoration, as I mentioned earlier, restoration by doing nubbins, that is, coral seeding, in addition to building artificial reefs.

This will restore the ecosystem by regrowing the marine life there. Earlier I mentioned that cooperation from all parties is important if serious bleaching occurs, to a certain degree. Cooperation from all departments is needed, for example MOTAC, the Ministry of Tourism and Culture Malaysia, to stop tourism activities, human activities, in protected areas that have already been damaged, and so on. What is also important, Mr Speaker, is cooperation from all parties, especially the private sector. So I would like to extend many congratulations and thanks especially to the two largest companies, PETRONAS and Malakoff, which together have made coral seeding nubbins on the seabed. For example, at Pulau Besar, Mersing, and also in part in the waters of Terengganu. And most importantly, Mr Speaker, I want to say here that the marine park is a very, very exclusive area. Therefore, the ministry is of the view that the existing Act is not sufficient. So the ministry is amending, is working to obtain agreement from all parties to draft a JTLM Act relating to the conservation and protection of the marine park. That is all. Thank you.

Thank you, Mr Speaker. My supplementary question is, we know that among the causes leading to damage of marine ecosystems is rubbish disposal, especially along the coastline and also in water areas, which causes chemicals or plastic materials to become causes of ecosystem damage. Likewise, oil spills on the surface of the sea. So I would like to know whether studies have been carried out by the ministry? What percentage, under the current situation, of our coral reef ecosystem is still in good condition and what percentage has been damaged? What actions have been taken by the ministry to overcome the causes of coral reef damage in our country? Thank you.

Mr Speaker, the question focuses on what percentage of damage has occurred. I thank you for that concern. I have figures here. So, based on monitoring data over eight years, it was found that the increase in the percentage of live coral cover has risen almost to the level before the coral bleaching phenomenon, namely 49.96 per cent, compared with 45.95 per cent. This means that in terms of damage, it is difficult to measure, but bleaching has occurred at a level that is still somewhat controlled. That is why I mentioned earlier that cooperation from all parties is very important. For example, if an oil spill occurs, under the Department of Environment, we immediately take action, with cooperation from all parties, especially our port authorities, to immediately carry out oil combat, that is the term. That is one of them. So those are among the matters raised, and more or less that is the meaning in terms of figures: damage is difficult to measure, but the situation is still controlled. That is all. Thank you.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Rompin.

Honourable Mr Speaker, once upon a time, artificial reefs were the most effective conventional approach carried out by either the Department of Fisheries or other departments to revive natural corals. However, in recent times we find that this approach, the budget for this, is increasingly absent from the ministry's agenda to build artificial reefs, which not only allow natural corals to grow but also, if built along the coastline, can block illegal trawlers from approaching the coast. In addition, there is also the threat of a type of creature called, in the terms of village folk, tapak sulaiman, which eats coral rocks. It eats coral rocks. What efforts is the government making to overcome this? Once it was a disease and something very worrying when corals were attacked by tapak sulaiman, called, a type of animal. What is the way to overcome this problem? Please.

Mr Speaker, there were two matters just now. Earlier, about the lack of artificial reef projects. Actually, for this, Mr Speaker, the ministry relies more on cooperation from all parties, because whether making nubbins or coral seeding using PVC frames and so on, or artificial reefs using tyres, old boats, it actually does not require a large allocation. We encourage more cooperation or invitations from several large companies such as Malakoff and PETRONAS just now, who have also contributed together, apart from the event, with permission, the Malaysian Fisheries Development Authority (LKIM) and other relevant departments. Many old boats that are no longer used can be turned into artificial reefs. This means that it does not require a very large allocation. As for tapak sulaiman, actually tapak sulaiman, as mentioned by the Honourable Member for Rompin, is also part of marine life that has its own functions. What is important is monitoring by the Department of Marine Parks Malaysia; if, for example, damage to coral reefs occurs due to tapak sulaiman, of course separation work must be done as soon as possible so that it does not damage the coral reefs. It is important that we... we want to monitor at all times, it is difficult, but what is important is that by monitoring, and perhaps also a good approach, we carry out scuba diving activities among interested members of the community to also participate as volunteers in removing the tapak sulaiman. That is all. Thank you.

Mohamad Imran bin Abdul HamidPKR · PRLumut · questionEN

2. Rear Admiral (B) Haji Mohamad Imran bin Abd Hamid [Lumut] asked the Prime Minister to state what Islamic propagation (dakwah) programmes are exposed to Orang Asli preachers throughout Malaysia.

Dato’ Dr. Asyraf Wajdi bin Dato’ DusukiDeputy Minister in the Prime Minister's DepartmentEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Mr Speaker, at present there are many dakwah organisations, whether government or non-government bodies, that play a role in developing the Orang Asli Muslim community.

Dato’ Dr. Asyraf Wajdi bin Dato’ DusukiDeputy Minister in the Prime Minister's DepartmentEN

Among them are the Department of Islamic Development Malaysia (JAKIM), the State Islamic Religious Councils (MAINS), the State Islamic Religious Departments (JAINS) and the Malaysian Islamic Welfare Organisation (PERKIM). Related agencies have planned and organised various programmes to ensure that preachers among the Orang Asli can carry out their dakwah duties with wisdom and effectiveness. The strengthening of dakwah among the Orang Asli Muslim community is implemented by training and educating them in the aspects of education, religion and the inculcation of noble values. In the framework of empowering dakwah programmes for the Orang Asli community by preachers, JAKIM has organised various specific activities and programmes every year, such as the Muzakarah for Orang Asli Community Mobilisers, the Ijtimak for Orang Asli Community Mobilisers, the Convention for Orang Asli Community Mobilisers, discussions on current issues, reinforcement classes on fardu ain and so on. That is all. Thank you.

Mr Speaker, Honourable Deputy Minister, is there no government plan to further empower these Orang Asli so that they can join the mainstream of Malaysian society?

For example, in the aspect of the Islamic religion, we do not see any Orang Asli who are capable of becoming religious officers or becoming imams at district or state level, and at other events such as Quran recitation and the Maulidur Rasul celebration. We do not see Orang Asli being brought forward to show that the government is truly sensitive to the position of Orang Asli, especially those who are Muslim, in Malaysia. Thank you, Mr Speaker.

Thank you, Honourable Member. For the information of the Honourable Member, in fact these strengthening and development programmes for the Orang Asli are carried out in an integrated manner with various government agencies, especially the Department of Orang Asli Development (JAKOA), as well as the State Islamic Religious Councils and the State Islamic Religious Departments. For the information of the Honourable Member, also, in fact today we already have many religious officers from among the Orang Asli themselves, including imams. Only the number, if the Honourable Member wants it, I can provide it in writing. That is all. Thank you.

Dato' Hasbullah bin OsmanUMNO · BNGerikEN

Thank you, Mr Speaker. Honourable Minister, we know that dakwah and also our approach to the Orang Asli community is not new, not just a year or two, but more than 40 to 50 years. What worries us is that the mubaligh under JAKIM, and perhaps their recruitment under the Islamic Religious Council, sometimes come once a month and are gathered at certain times. So in the end, what happens is that the dakwah just now, or this, does not enable the Orang Asli to get close to Islam. Another point: if we have been entering Orang Asli villages for more than 40 years, it is time, more than 40 years, that if there is a surau inside there, we must establish Friday prayers in the Orang Asli villages. So far, have all the Orang Asli villages in this Peninsula established Friday prayers? I ask the government. Thank you.

Thank you, Honourable Member. I very much agree with the suggestion and view of the Honourable Member. Indeed the responsibility for carrying out dakwah and looking after the welfare of the Orang Asli does not rest only on the shoulders of JAKIM or certain bodies alone, as I mentioned just now. We implement it in an integrated manner. We have the Department of Orang Asli Development under the Ministry of Rural and Regional Development. We also have the State Islamic Religious Councils and the State Islamic Religious Departments, which are fully responsible for Islamic religious affairs. In the context of these Orang Asli villages as well, where we have a large number of Orang Asli, in fact we have already established suraus and mosques that are permitted to hold Friday prayers.

Once again, I do not have the figures in hand in terms of statistics, but I can attach them to the Honourable Member after this in writing, because there are indeed suraus in Orang Asli villages where the number of Orang Asli is sufficient for us to hold Friday prayers in their villages. That is all. Thank you.

Koh Nai KwongMCA · BNAlor Gajah · questionEN

3. Datuk Koh Nai Kwong [Alor Gajah] asked the Minister of Tourism and Culture to state whether the ministry plans to provide tourism information at every GoKL bus stop, whose service is provided free of charge and is widely used by foreign tourists.

Datuk Mas Ermieyati binti SamsudinBERSATU · PNDeputy Minister of Tourism and Culture · Masjid TanahEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Mr Speaker. For the Ministry of Tourism and Culture, through its agency Tourism Malaysia, brief information regarding the free GoKL bus service will be included in tourism brochures such as the KL Map and Guide and also Kuala Lumpur Malaysia's Dazzling Capital City in upcoming prints. All information on tourism products throughout Malaysia can be obtained from such tourism brochures published by Tourism Malaysia, of which we have various brochures that can be obtained, placed at tourist information centres along the GoKL bus routes, such as the Malaysia Tourism Centre, namely MATIC, Sultan Abdul Samad Building, and also KL Sentral. In addition to the efforts of this ministry, other parties such as the Kuala Lumpur Tourism Association, the Kuala Lumpur Tourism Board and other bodies are also encouraged and suggested to take this opportunity to distribute information to tourists using this platform. Thank you.

Datuk Koh Nai KwongMCA · BNAlor GajahEN

Thank you, Mr Speaker. I also thank the Honourable Deputy Minister for the very clear and excellent answer. Honourable Minister, it cannot be denied that the GoKL public bus transport has potential and creates a positive impact on the tourism sector. Therefore my supplementary question is whether the ministry will also expand this service to other stops, such as taxis, and places and states with many foreign tourists, for example in the state of Melaka. Thank you.

Datuk Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Thank you, Honourable Member for Alor Gajah. Coming from Alor Gajah, you certainly do not forget to come from the state of Melaka. Surely there is also something for Melaka. As we are well aware, this service, as the Honourable Member for Alor Gajah asked just now, is, meaning this public service, falls under the regulation of the Public Service Commission. But from the perspective of the tourism sector, foreign tourists in particular and also domestic tourists are advised to obtain tourism brochures themselves from tourist centres, from Tourism Malaysia offices, of which there are about 18 throughout the country. In KL alone there are five, and in Melaka we can get them at Jalan Plaza, Melaka, at our office there. This shows that it is indeed not sufficient. Brochures or campaign materials to show attractive places, places that can be visited, or foods that we can distribute, especially for taxi drivers, or not only taxi drivers, becak drivers and so on, or any public transport, can be obtained from Tourism Malaysia offices, whose list is in this campaign book. I can also give it to the Honourable Member shortly for the Honourable Member's information. I think, apart from that, brochures can also be obtained in e-brochure form, which can be downloaded by yourself from www.malaysia.travel. This is part of our efforts to save printing costs. Thank you.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Thank you, Mr Speaker. Mr Speaker, I would like to welcome the pupils from SJK(T) Seaport, Kampung Lindungan, Sunway, who are here with their teacher, Cikgu Morgan. Over there, that side.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Where are you from over here, Honourable Member?

Tuan M. KulasegaranDAP · PHIpoh BaratEN

We don't know yet over here [Laughter]

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)

Okey.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Mr Speaker, I would like to ask about the role played by GoKL. Will it be limited to only a few places, or will it also extend to places such as Gua Tempurung and Ipoh? This is because, as the Honourable Member knows, Ipoh is now the best place to visit and the best place to live. The 6th place in the whole of Asia. I hope the ministry can play a major role. Earlier I had informed the Honourable Deputy Minister that Gua Tempurung is a unique cave, Mr Speaker. I request that Mr Speaker also visit that place. It's a very unique place, more beautiful, and the most beautiful place in the country. I hope certain encouragement will be given for the public to go to Gua Tempurung and Ipoh. The problem we face in Ipoh in particular is the shortage of buses, public buses, even though many of the tourists who come are numerous. Not only from abroad but also from within the country.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

I am also surprised, Mr Speaker. My friends who wanted to go to Ipoh on Friday stayed there, ate and enjoyed themselves there, and on Saturday they went home. But their first complaint was the shortage of buses and so on. What role can the Honourable Member play, and what suggestions can be made so that there will be a win-win position in this matter? Thank you.

Datuk Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Thank you, Honourable Member for Ipoh Barat. For the information of Mr Speaker, through the NBOS initiative, we will work together with JPJ (Road Transport Department), SPAD (Land Public Transport Agency) and Tourism Perak, and this is not only for Ipoh but also applies to other states that are interested in promoting attractive places. Especially for Ipoh Barat, the existence of tourism products such as Gua Tempurung is certainly something we can explore together, and a campaign can be carried out through the NBOS initiative just now. As for the first question, to increase the number of buses, I think that is beyond the authority of the Ministry of Tourism and Culture, but we can also propose that they increase them further so as to provide convenience to tourists who come from abroad and wish to see or experience and explore beautiful places such as those in the Honourable Member's area. For any suggestions, the Honourable Member may meet me, and we will discuss them later at the back. Thank you.

Idris bin AhmadPAS · PNBagan Serai · questionEN

4. Tuan Idris bin Haji Ahmad [Bukit Gantang] asked the Prime Minister to state the total allocation for TV Al Hijrah each year from 2011 to 2015 and the income earned from advertisements broadcast.

Dato' Dr. Asyraf Wajdi bin Dato' DusukiDeputy Minister in the Prime Minister's DepartmentEN

Bismillahi Rahmanir Rahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, TV Al Hijrah was established as a company limited by guarantee, or, with permission, company limited by guarantee, a government company registered under the Companies Act 1965. TV Al Hijrah is fully funded by the government. At the same time, it is permitted to generate its own income through advertisements, sponsorships and other suitable income.

Dato' Dr. Asyraf Wajdi bin Dato' DusukiDeputy Minister in the Prime Minister's DepartmentEN

For the information of the Honourable Members, the total government grants from 2011 to 2015 are as follows: |Year|Amount (RM million)| |----:|---------------:| | 2011| 60| | 2012| 50| | 2013| 74| | 2014| 38| | 2015| 30|<END_TABLE_MARKER> Meanwhile, the total advertising income from 2011 to 2015 is as follows: |Year|Amount (RM)| |----:|----------:| | 2011| 2965162| | 2012| 2627812| | 2013| 7192000| | 2014| 7413000| | 2015| 6864000|<END_TABLE_MARKER> That is all, thank you.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. Since TV Al Hijrah is one of the channels whose role is to introduce, within the context of the fiqh of the arts that conforms with the syariah, advertising is one of the sources for covering the operating costs of TV Al Hijrah. My question is, what steps have been taken by the ministry, or by the Honourable Deputy Minister, or by TV Al Hijrah, to encourage halal companies to promote their products, and at the same time to introduce their products through advertising on TV Al Hijrah? This is because, if we look at the income from TV Al Hijrah's advertising, I feel it is rather small compared with television or other networks, which are expected to earn at most about RM7 million only. So what steps have been taken to encourage companies involved in halal production to advertise on TV Al-Hijrah? Thank you.

Mr Speaker, before that, I would like to take this opportunity to welcome, since earlier too, the visitors from the Nursing Diploma Programme and the Medical Laboratory Technology Diploma Programme, Pusat Perubatan Universiti Malaya... [Applause] Thank you, Honourable Member. In fact, the approach and position of the government in the context of TV Al Hijrah is that TV Al Hijrah should be what I may say, with permission, self-funded or financially self-sufficient. In that context, that is why, if you looked at the projections earlier, there was a drastic decrease from year to year from 2011 to 2015, and even in 2016 and 2017 to come. However, in terms of sponsorship or advertising, we can see that the increase has been very good, and after the restructuring and new approach introduced by TV Al Hijrah, for your information, this year alone until September, advertising has already reached RM10.5 million, an increase of 52 per cent compared with last year. We expect it to reach RM15 million by the end of this year, insya-Allah.

What is our approach in the context of realising the aspiration mentioned by the Honourable Member? In fact, one of the approaches we can see working effectively in obtaining these advertisements is focusing on Bumiputera Muslim SMEs who wish to offer or promote their halal products. This approach is carried out by TV Al Hijrah and is not done by any other TV stations, namely by offering advertisements at as low as RM2,500 only to Bumiputera Muslim entrepreneurs who wish to promote their halal products. This alone has helped them and also TV Al Hijrah, with permission, a win-win situation. From June to October 2016 alone, income from advertisements offered to them, or to the Bumiputera Muslim entrepreneurs I mentioned earlier, has already reached RM3 million. So, perhaps there is a blessing when we help Bumiputera Muslim entrepreneurs with small incomes with as little as RM2,500 only, in the context of also increasing the number of advertisements and the income of TV Al Hijrah. That is all, thank you.

Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. I would like to propose that TV Al Hijrah internationalise this channel by forming joint ventures with channels at the international level and with online networks at the global level, so that at the same time we can showcase our wasatiyyah branding, that is, our Islamic country's approach to the world. Thank you.

Thank you, Mr Speaker. Thank you to my elder brother, the Honourable Member for Kuala Kangsar, whom I think the people of Kuala Kangsar were not wrong to choose to come to this honourable House... [Applause] I think that proposal is very good and will certainly be taken into consideration by TV Al Hijrah, especially since we should promote the Malaysian model in the agenda of uplifting Islam in a wasatiyyah manner, which is well known at the international level. We are not extreme right, or, with permission... [Speaking in Arabic] or being lax in religion... [Speaking in Arabic] In this context, I think that through TV Al Hijrah, with the cooperation and suggestions given earlier, it will be seriously considered by TV Al Hijrah. Thank you.

Noraini binti AhmadUMNO · BNParit Sulong · questionEN

5. Dato' Dr. Noraini binti Ahmad [Parit Sulong] asked the Minister of Home Affairs to state the latest statistics on drug addicts among minors and women since 2009, whether they have increased or decreased, and what factors and steps have been taken to ensure that society does not get caught up in this problem.

Tuan Masir Anak KujatPRS · BNDeputy Minister of Home Affairs · Sri AmanEN

Thank you, Honourable Member for Parit Sulong. Mr Speaker, according to statistics released by the National Drug Information System (AADK), the cumulative total of drug addicts among teenagers aged 18 and below since 2009 to 2016 is 5,882 persons, with the breakdown as follows: | YEAR |TOTAL (PERSONS)| |--------------------|-------------:| | 2009| 332| | 2010| 2141| | 2011| 748| | 2012| 419| | 2013| 405| | 2014| 622| | 2015| 717| |2016 (until August)| 498|<END_TABLE_MARKER>

Tuan Masir Anak KujatPRS · BNDeputy Minister of Home Affairs · Sri AmanEN

The cumulative total of drug addicts among teenagers aged 18 and below from 2009 to 2016 is 5,882 persons, with the breakdown as follows: | YEAR |TOTAL TEENAGE ADDICTS/PERSONS (18 years and below)| |-------------------|----------------------------------------------:| | 2009| 332| | 2010| 2141| | 2011| 748| | 2012| 419| | 2013| 405| | 2014| 622| | 2015| 717| |Until August, 2016| 498|<END_TABLE_MARKER> The cumulative total of female drug addicts from 2009 until 2016 is 4,908 persons, with the breakdown as follows: | YEAR |TOTAL ADDICTS (FEMALE/PERSONS)| |-------------------|----------------------------:| | 2009| 278| | 2010| 580| | 2011| 490| | 2012| 439| | 2013| 668| | 2014| 699| | 2015| 1013| |Until August, 2016| 741|<END_TABLE_MARKER> The statistics for both categories show a trend of decrease and increase every year. Most drug addicts get involved in drug abuse due to the influence of peers, curiosity, and also the search for enjoyment in nightclubs. Recently there has been talk that many women want to get involved with syabu or ice in order to manage their weight. To ensure that society does not get caught up in this problem, especially among school students, various preventive programmes focusing on young people are carried out continuously, as follows: (i) the Program Intelek Asuhan Rohani, which is a drug prevention education programme for primary school pupils; (ii) the Program Sayang Hidup Elak Derita (SHIELD), implemented at secondary school level to raise awareness and strengthen students' self-resilience, namely for those aged between 13 and 18 who are identified as being at high risk of drug abuse; (iii) the Program Sukses Matang, Aktif, Rasional dan Tanggungjawab (SMART), a programme that guides and educates youth to improve their skills, knowledge and awareness of the dangers of drugs and a more positive way of life, in order to produce drug-free youth;

Tuan Masir Anak KujatPRS · BNDeputy Minister of Home Affairs · Sri AmanEN

(iv) we also have a programme with the National Service Training Programme (PLKN) or Latihan Khidmat Negara in Sandakan to ensure that school leavers have skills regarding a healthy lifestyle and practise them in themselves and help others; and (v) the last programme is the Tomorrow's Leader programme, an awareness programme on the dangers and effects of drugs implemented among students of Institutions of Higher Learning in the form of seminars, forums and talks, to provide knowledge, awareness and also skills to university students regarding a healthy lifestyle without drugs.

Dato’ Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Thank you to the Honourable Minister who answered my question. I would also like to take this opportunity to welcome the delegation of PUSPANITA Parlimen Jerantut to the House this morning... [Applause] My supplementary question: I heard the various programmes stated by the Honourable Minister and the original answer. So apart from those programmes, what other aggressive steps will the Ministry of Home Affairs (KDN) take to increase public awareness so that we can jointly tackle this drug problem, especially recurring drug abuse among school pupils and women in Malaysia? Thank you.

Tuan Masir Anak KujatPRS · BNSri AmanEN

Thank you, Honourable Member. On the matter of relapse or recurrence, according to the statistics provided by AADK, there are about 30 per cent of cases every year that recur, including women and school students. Certainly KDN, if we look at this percentage, it is quite high, and we must also hold aggressive public awareness programmes such as television broadcasts, billboards, print media, Facebook, Twitter, Youtube, blogs and websites, as well as face-to-face programmes, namely we have mobile buses to meet customers or those who have used drugs. So certainly these programmes will help reduce cases like those mentioned by the Honourable Member earlier, namely relapse or... [Recording unclear] Occurring with drug abuse in our country.

Tuan Er Teck HwaDAP · PRBakriEN

Thank you, Mr Speaker, for giving me the opportunity. Here I would like to ask the Ministry of Home Affairs whether it is cooperating with the Ministry of Women, Family and Community Development and the Ministry of Education to overcome this problem. Requesting an explanation.

Tuan Masir Anak KujatPRS · BNSri AmanEN

Honourable Bakri, indeed if we have community rehabilitation programmes and so on, we definitely involve the Ministry of Women, Family and Community Development. Certainly, most of them, if we look at one programme we hold, namely Committee Empowerment, we give awareness to the local community so that they are more aware of the drug problem occurring in their respective areas. That is all, thank you.

Mohd Khairuddin bin Aman RazaliPAS · GSKuala Nerus · questionEN

6. Dato' Dr. Mohd. Khairuddin bin Aman Razali [Kuala Nerus] asked the Prime Minister to state the current status of the development project of 11,530 residential units under the FELDA New Generation Housing (PGBF) programme, which has cost over RM1 billion.

Dato' Razali bin IbrahimUMNO · BNDeputy Minister in the Prime Minister's Department · MuarEN

Bismillaahir Rahmaanir Rahiim. Assalamualaikum warahmatullaahi wabarakaatuh. Greetings of peace and 1Malaysia. Mr Speaker, the construction of the FELDA New Generation Housing (PGBF) project for the remaining 11,530 residential units is estimated to involve expenditure of RM899 million. It is a fully financed initiative by selected companies under the Private Funding Initiative, with permission, Private Finance Initiative. FELDA is now at the final stage of finalising the company that will implement the second phase of this PGBF project, and it is expected to begin in early 2017. Thank you.

Thank you, Honourable Minister. This project has been proposed for so long, namely since Budget 2013, and at the initial stage it was proposed at RM1.5 billion. At that time, the Chairman of FELDA enthusiastically answered that it would be completed within four years, not five years. But what we see today, now that 2016 is about to end, I want to know the status of the first phase that is currently ongoing. The earlier projection was, it was said, 120,000. I may need an explanation from the Honourable Deputy Minister. However, what I want to raise is whether there is an issue of weak management or an issue of transparency that has caused it to be neglected for so long and delayed for so long. How many have so far been handed over to the second-generation FELDA children up to now? Thank you.

Dato' Razali bin IbrahimUMNO · BNMuarEN

Thank you, Honourable Member for Kuala Nerus. Mr Chairman, this question is about the second matter, but he wants to ask about the first. So I do not have the full details, but for the first, in terms of handover, we are in the process of handing over to the recipients, the owners. However, we are currently helping them obtain purchase financing from financial institutions. Insya-Allah, we will hand them over by the end of this year. We are discussing with Bank Simpanan Nasional and MBSB because most of these applicants do not have salary slips. So we have to show statements that they receive a continuous, regular income that can repay the loan if the loan is granted. Second, there are many factors that have actually caused the delay. In the first phase, we appointed almost 28 companies as operators of the projects that we have launched. However, some companies were unable to do so for various reasons; I have answered in this House before, and some have already been wound up, winding up. Second, in terms of the process of obtaining land approval, we had to discuss with the state government. This includes the locality, the site location, which requires a rather large amount of funds. Therefore, I do not rule out that financial factors, among other matters, to operate the said amount have somewhat contributed to the delay.

Dato' Razali bin IbrahimUMNO · BNMuarEN

Namun begitu perlu saya nyatakan bahawa dalam kita menguruskan PGBF ini, kita juga ada beberapa inisiatif perumahan sebagai contoh Projek-projek Generasi Warga FELDA. Itu pun kita laksanakan, baru selesai pada tahun 2015. Kita juga ada Sentuhan Kasih di Tenggaroh, di Chini, di Laka Selatan dan kita juga memberi pembiayaan hampir RM1 bilion kepada peneroka yang memohon untuk membuat pinjaman membaik pulih rumah sedia ada. Jadi, keseluruhan ini dijalankan serentak. Saya percaya, kita sedang berusaha dengan kuat untuk kita menyelesaikan urusan PGBF ini. Terima kasih Yang Berhormat.

Tuan Anuar bin Abd. ManapUMNO · BNSekijangEN

Terima kasih Tuan Yang di-Pertua. PGBF ini yang kita tahu adalah memang antara hasrat kerajaan sebenarnya untuk membantu generasi kedua FELDA yang ada di tanah-tanah rancangan ini untuk memiliki rumah masing-masing. Kita tahu juga di kebanyakan kawasan FELDA ini masih terdapat tanah-tanah kosong yang boleh diusahakan untuk didirikan rumah PGBF ini. Walaupun dimaklumkan ada beberapa masalah berkaitan dengan pembinaan projek dan sebagainya, saya ingin mengetahui, baru-baru ini Perdana Menteri yang juga merupakan Menteri FELDA ada memaklumkan tentang Makmal Pemantapan FELDA. Jadi, mungkin minta Yang Berhormat Menteri, bolehkah saya tahu apakah hasil daripada perbincangan dalam Makmal Pemantapan FELDA ini, terutamanya tentang untuk mengurus balik perumahan generasi baru FELDA ini. Terima kasih.

Terima kasih Honourable Sekijang. Makmal ini di peringkat akhir. Pembentangan telah pun kebetulan dibuat semalam yang saya tidak dapat update ke Dewan yang mulia ini. Saya difahamkan pihak pengurusan menerima.

Antara perkara yang dibincangkan dalam Makmal Pemantapan FELDA ini adalah untuk melihat dua perkara utama iaitu mengenai pengurusan hutang peneroka yang menjadi isu sangat besar pada ketika ini. Kedua, mengenai tentang hala tuju perniagaan FELDA di masa akan datang. Saya difahamkan kedua perkara ini telah pun hampir dimuktamadkan dan insya-Allah pengumuman kepada perkara ini akan dibuat oleh Yang Amat Berhormat Perdana Menteri sebaik kita dapat putuskan apakah kaedah-kaedah yang boleh kita beri manfaat yang saya boleh beri jaminan perkara itu nanti bakal menyelesaikan dua perkara yang saya nyatakan tadi. Keduanya, mengenai perumahan dalam makmal tersebut. Saya percaya dalam bajet tahun hadapan, FELDA disediakan RM200 juta mengenai PGBF, itu akan dapat membantu meringankan sedikit tanggungan. Oleh kerana pihak FELDA telah pun membiayai RM500 juta untuk PGBF fasa pertama yang 8,000 unit dan RM200 juta itu sudah tentu dapat membantu. Saya mengucapkan terima kasih kerana sokongan semua pihak dalam mengenal pasti apa juga masalah bagi warga FELDA dalam makmal tersebut sudah menampakkan sedikit jalan keluarnya. Saya percaya kita semua memang mengharapkan PGBF ini dan juga pendapatan, kedudukan warga peneroka terus dapat kita bela. Terima kasih Yang Berhormat.

Shabudin YahayaUMNO · BNTasek Gelugor · questionEN

7. Datuk Shabudin bin Yahaya [Tasek Gelugor] asks the Minister of Science, Technology and Innovation to state what strategies the ministry has taken to develop new companies in the field of Internet of Things (IOT) and Big Data Analytics application development, which now have very great potential in the country's ICT industry.

Datuk Dr. Abu Bakar bin Mohamad DiahUMNO · BNDeputy Minister of Science, Technology and Innovation · Tangga BatuEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Greetings of peace and greetings of 1Malaysia. Thank you to the Honourable Tasek Gelugor, who is interested in this great national mission. Mr Speaker, the Ministry of Science, Technology and Innovation (MOSTI) has developed the National Internet of Things (IoT) Strategic Roadmap, which aims to realise Malaysia's vision as the leading regional hub for IoT development, with the mission of creating a national IoT ecosystem. This is a task that the government has assigned to the Ministry of Science, Technology and Innovation. The main objective is to create an IoT industry which will contribute to the Gross National Income as well as provide commercialisation opportunities for local technology. Through economic initiatives such as the Economic Transformation Program (ETP), the Government Transformation Program (GTP), Digital Malaysia (DM), and Digital Lifestyle Malaysia (DLM), it is expected that Internet of Things technology in Malaysia will record annual revenue of RM9.5 billion within the next five years. This revenue is expected to increase to RM42.5 billion by 2025. For the information of Honourable Members, the Internet of Things is an internet-based system comprising sensors, software and electronic hardware. Meanwhile, Big Data Analytics (BDA) is the development of a computing platform that is specifically focused on the management and analysis of very large volumes of data. IoT and BDA are interrelated because IoT requires large data for processing, and BDA is the platform for processing large data for IoT. They are inter-related with one another. To develop new technology in the field of Internet of Things application development, including Big Data Analytics (BDA), the following are the strategies that have already been considered by MOSTI. First, the catalyst is IoT technology as an industry, by profiling the Malaysian IoT industry landscape, understanding the targets and suppliers, and identifying the existing needs and challenges. All the needs and challenges that are identified will be used in forming the IoT industry ecosystem.

Datuk Dr. Abu Bakar bin Mohamad DiahUMNO · BNDeputy Minister of Science, Technology and Innovation · Tangga BatuEN

Second, development of the IoT-BDA industry and SME programmes, because we also want to involve SMEs in this IoT and BDA, through IoT awareness programmes and the creation of processes for ideas and innovation among SMEs and start-up entrepreneurs in developing IoT and BDA-based applications and solutions. Third, promotion of successful domestic IoT and BDA companies at the international level. Fourth, the use of Open Community Data or Data Komuniti Terbuka through policies on data use and the protection of security and the rights of personal data. Fifth, encouraging data sharing among IT development companies. This is important through the establishment of IoT infrastructure known as Open Community Data, because they must have a community among them called Open Community Data. This community functions as the host for IoT and BDA in Malaysia. Sixth, building laboratories. This is actually very important in developing IoT in Malaysia because this is the main strategy that we need to undertake, namely that we must build laboratories at the national level to help SMEs and start-up entrepreneurs enhance the scale of their innovation and move from prototype scale to commercialisable industrial scale. These labs are very important because they want to do testing and produce prototypes. Finally, enabling them to be trusted by the general public. Seventh, providing a platform for test markets to accelerate the culture of trial products or pilot markets for IoT, BDA, SMEs and start-up entrepreneurs who face financial and branding challenges. This platform aims to provide opportunities for collaboration between new companies and large companies such as multinational corporations, Mr Chairman. That concludes my speech, thank you.

Datuk Shabudin bin YahayaUMNO · BNTasek GelugorEN

Thank you, Mr Speaker. Thank you to the Honourable Minister, who has given such a detailed explanation that helps us, the people of Malaysia, understand. As we are well aware, the Internet of Things, or IoT, is a very sophisticated ICT technology phenomenon, which causes electronic devices to communicate with each other via the internet and so on. Looking at the Honourable Minister's explanation just now, the prospects for the development of this technology are expected to generate revenue of up to RM9.5 billion.

Datuk Shabudin bin YahayaUMNO · BNTasek GelugorEN

It is a very high, very large ICT technology prospect, and if we look at its needs, it is also extremely important because at present it is estimated that only 72.2 per cent of areas can be reached by the internet, in Malaysia I mean. So this shows that this prospect is extremely important and provides very large returns and creates a great many employment opportunities. So my question is, what efforts is the government making to attract more Malaysian companies, especially because if we do not make preparations, this process will be monopolised by international companies and so on. So we hope, I would like to ask the government, what efforts the government has made to attract more Malaysian companies, especially those involved in the fields of innovation, science and technology, to pioneer businesses oriented towards internet-connected objects so that no monopolistic activities occur in the market and instead equal opportunities are created for all parties. Thank you.

Mr Speaker, first of all, when we talk about UCT, we must have a good computer network system. This is something we need to do, namely that the Ministry of Science, through MOSTI, we have our own strengths in promoting IoT on the global stage, because MOSTI has contributed to- this is a strength we have, because before something can be IoT-ed, we must have strengths and what we possess, because we must begin to IoT-ize these products that can communicate with each other by means of our own innovative products. Therefore, the strength that MOSTI has lies in MIMOS, and it is a strength that must become the main attraction for us.

Okay, MIMOS has contributed to- we must record what MIMOS has. MIMOS has contributed to the national ICT industry development agency through the introduction of internet services in Malaysia through the establishment of the National IT Agenda network, the establishment of the Multimedia Super Corridor, the establishment of Cybercity in Malaysia, and the management of domain names through MyDomain. These are our strengths. Encouraging ICT entrepreneurs through the open source master plan initiative as adopted by MAMPU. This is also a strength that we must use to the best of our ability. Technology developed by MIMOS is also a source of pride that has been adopted by many ministries such as the Treasury Department, KPDNKK, the Ministry of Human Resources, MOA, MOH, PERKESO. These are our strengths which we can channel to residents, to our people, and this is another thing: we have filed more than 700 patents. 180 have been approved, of which 15 per cent have been commercialised. From this aspect, this is a strength that MIMOS has which can be introduced, with a value of more than RM1 billion over the last five years. So this is a strength and I am very confident in the abilities we have. I want to explain a little more here. Malaysia can take part in the IoT-based industry because it does so through the manufacturing of goods, hardware manufacturing. We have this and can use it. Design creation or network services, networks or network services, software development, application development and analytics services and services. These are strengths we have that we can develop in the future. Thank you.

Ahmad Baihaki bin AtiqullahPAS · PRKubang Kerian · questionEN

8. Tuan Ahmad Baihaki bin Atiqullah [Kubang Kerian] asks the Minister of Health to state what remedial measures have been taken to overcome the shortage of medicine supply in government hospitals as a result of the budget allocation cuts for the Ministry of Health in 2016.

Dato’ Seri Dr. Hilmi bin YahayaUMNO · BNDeputy Minister of Health · Balik PulauEN

Thank you, Honourable Member from Kubang Kerian, Tuan Ahmad Baihaki. Mr Speaker, this question concerns the shortage of medicines in government hospitals as a result of the budget allocation cuts for the Ministry of Health in 2016. Mr Speaker, I admit that there was a cut of RM380 million from the Ministry of Finance, but after we made an appeal, the Right Honourable Prime Minister has returned it step by step, and now we have received everything back, Mr Speaker. In fact, the medicines, Mr Speaker, we purchase through central contracts and distribute them to hospitals and clinics throughout Malaysia. So there is no problem of medicine shortages. However, the ministry is working to optimise the use of medicines. Indeed, there was wastage before this, Mr Speaker. For example, patients with chronic conditions were given medicines for up to six months. After three months they came back to the clinic, saying their medicine had spoiled or they had moved to Kuala Lumpur, from the village to Kuala Lumpur, leaving the medicine in the village. So they came back to get medicine. So in this way we were wasting a lot. Therefore, in this matter, Mr Speaker, the ministry has issued guidelines to optimise medicine expenditure. (i) cultivating the rational use of medicines, avoiding inappropriate polypharmacy and strengthening control over the supply and use of specialist medicines. Polypharmacy means one illness and three or four medicines being taken. So there is no need for so many; (ii) prioritising the procurement and use of generic medicines over innovator or original medicines;

Dato’ Seri Dr. Hilmi bin YahayaUMNO · BNDeputy Minister of Health · Balik PulauEN

(iii) continuing the practice of supplying medicines for chronic illnesses in stages. The period of follow-up medicine supply should be limited to one month only; (iv) encouraging patients to bring remaining medicine when collecting follow-up medicine at the pharmacy counter. Supply or addition of medicine will be done by topping up against the remaining medicine that is already available. It really does happen, Mr Speaker. For a one-month supply, they do not finish it. So they come back, they have an appointment, come back, and ask for new medicine. Therefore we ensure that they bring the extra medicine to the clinic and it can be topped up on the medicine they already have; (v) encouraging patients to bring medicines they have already taken when they are admitted to a ward. The pharmacy officer will assess the situation and use it if the regimen or medicine still needs to be continued during treatment in the ward; (vi) tightening control over the use of medicines that require approval from the Director-General of Health. Applications for approval from the DG are limited only to life-saving medicines and where there is no other alternative in the KKM drug formulary; and (vii) strengthening the procurement, storage and use of medicines by ensuring that no wastage occurs, Mr Speaker.

Tuan Ahmad Baihaki bin AtiqullahPAS · PRKubang KerianEN

Thank you, and also to the Honourable Minister who has answered. Thank you for the government returning the allocation that was cut, but in 2016 it was cut again in 2017. However, I feel that this cut in allocation should not have happened, especially in critical sectors and services such as hospitals and health. In fact, it should have been increased in line with the rise in cases and costs, as well as patients and the hospital facilities themselves. I am doubtful whether this is also the main reason for the government to raise treatment charges at government hospitals in future. My question is, what is the government's guarantee that the medicines supplied will remain of good quality, especially for Class 3 patients who cannot afford to see specialists by paying in full. Does the government not intend to re-evaluate that cut and apply for additional allocation immediately to ensure the health of these people is not gambled with? Thank you.

Dato’ Seri Dr. Hilmi bin YahayaUMNO · BNBalik PulauEN

Mr Speaker, a correction. For next year, 2017, in the budget we are now discussing, we will receive an additional allocation of RM2 billion, Mr Speaker. That means, I think, it is sufficient for ordinary expenditure, Mr Speaker. In our attempt to save medical costs and medicine costs, currently the cost of generic use compared with innovator or original medicine is roughly fifty-fifty, 50-50 per cent. Last year, we spent RM2.2 billion on medicines alone. This year it has reached RM1.9 billion up to October.

Dato’ Seri Dr. Hilmi bin YahayaUMNO · BNBalik PulauEN

In terms of generic use, it has now reached 60 per cent of the total types of medicine, generic at 60 per cent and innovator or original medicines at 40 per cent. We are continuing efforts to add more generic medicines and reduce original medicines. However, the condition for these generic medicines is that every time we register these medicines, we must check their bioequivalence. That means whether they are the same as the original medicine in terms of their content. If it is lacking, we do not accept it, we do not register it. That means that even though the medicine is generic, its quality is the same as the innovator medicine. We are working on this and also encouraging local production, Mr Speaker. At present, what we get from local sources is 43 per cent and from imports 57 per cent. So we will work to increase local supply further, Mr Speaker.

Dato’ Seri Dr. Hilmi bin YahayaUMNO · BNBalik PulauEN

It is not because of a shortage of funds that we want to raise hospital charges, no. In fact, I have already said in the newspapers that for third class there is no increase of one sen at all; everything stays the same, and only second class and first class go up. The second- and first-class patients affected total only about 30,000 out of an overall total of two million. That means that about 98.5 per cent of patients are not affected at all by this increase in hospital charges. Those who have money, of course, want a more comfortable place, so they themselves choose to stay in second-class or first-class wards. They choose on their own; they are not forced. So there is no question of ordinary patients being treated as stepchildren or anything of that sort, Mr Speaker.

Thank you, Mr Speaker. Honourable Deputy Minister, I would like to ask: the government chose generic medicines because they are seen as more economical. Honourable Deputy Minister, to what extent does the selection of generic medicines reduce costs? May I know how much, how many hundreds of millions, how much cost we can reduce and save each year by using these generic medicines rather than using general drugs or the patented ones?

Dato' Seri Dr. Hilmi bin YahayaUMNO · BNBalik PulauEN

Mr Speaker, part of my answer has in fact already been given, namely that at present the cost we use as an anchor, the purchasing ratio, is 50:50, where 50 per cent is generic and 50 per cent is innovator. That is in terms of cost, Mr Speaker. However, in terms of the list of medicines, 60 per cent of the types of drugs are generic medicines and 40 per cent are innovator or original medicines, which means we have already saved a great deal. We will continue to make efforts to save even more, and we will ensure that the quality of generics is the best; we import the best. In fact, Mr Speaker, abroad there are many different levels of quality for these medicines: first class, second class, first grade, second grade, third grade. So however it is, we choose medicines which, when they come into Malaysia and are registered, we must first check their quality, their bioequivalence, Mr Speaker. If they are the same, we accept them; if they are not the same, we reject them. So in this matter we are also making efforts to further increase the use of generics, and in that way we can save our costs, Mr Speaker.

Budiman bin Mohd ZohdiUMNO · BNSungai Besar · questionEN

9. Tuan Budiman bin Mohd. Zohdi [Sungai Besar] asks the Minister of Education to state what positive effects have been achieved under the Form Six Rebranding Programme, and how this rebranding has managed to dispel the perception that Form 6 is a second choice for those who cannot secure a place at a public university.

Datuk P. Kamalananthan A/L P. PanchanathanMIC · BNDeputy Minister of Education · Hulu SelangorEN

Thank you, Mr Speaker. Thank you, Honourable Member for Sungai Besar. There is no pantun and no poem either; the question will be answered with a reply. I hope it will satisfy your taste.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)

Hebat.

Thank you, Honourable Member for Sungai Besar. Mr Speaker, honourable Members of Parliament, for the information of the Honourable Members, the positive effects of the Form 6 rebranding can be seen in terms of both quantity and quality. In terms of quality, there has been an increase in students registering for Lower Form 6. By way of comparison, in 2015, a total of 51,276 students registered for Lower Form 6, while in 2016, a total of 57,485 students registered for Lower Form 6. In addition, enrolment data show a decrease of 1.35 per cent in the number of students who left Form 6 after registering, for the 2014 to 2015 cohort compared with the 2013 to 2014 cohort. This shows that the number of students who remain in Form 6 after registering is higher than in previous years. This reflects an increased level of public confidence in Form 6 education as a pathway to higher education, as well as an education channel capable of building quality human capital. That is in terms of quantity.

As for the quality aspect, Honourable Member, the introduction of the new modular STPM assessment system, introduced in 2012, raised the STPM cumulative grade point average (PNGK) for 2013 to 2.54 per cent, compared with 2.33 per cent the previous year, an increase of 0.21 per cent. This increase continued until 2014, at 2.62 per cent, and in 2015 at 2.65 per cent. This shows that the rebranding of Form 6 has succeeded in improving the quality of teaching and learning. Traditionally, Honourable Member, Form 6 offers quality pre-university education at a reasonable cost. Through Form 6, opportunities for pre-university education are opened more widely to all eligible students. The STPM certificate obtained by Form 6 students is recognised by Cambridge UK and also by JPA. Recognition from Cambridge UK allows STPM leavers to be admitted to further study at all universities in the country. More proudly, STPM qualifications are also accepted for admission to all universities in Commonwealth countries, such as the University of Cambridge, Oxford University, University of Auckland and other leading universities. For students who do not get the opportunity to continue their studies at university, recognition by JPA enables them to obtain employment opportunities, whether in the public or private sector, with higher salary scales. Thank you, Honourable Member.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

In the Sungai Besar Parliament there is no Form 6 college, but I have often been asked, several times, to visit the Sabak Bernam Parliament, where there is the Tuanku Abdul Rahman Putra Form 6 College. Last month they built an art gallery, and I saw many young talents who could be developed in terms of painting. However, when I had a dialogue with them, they asked about their future, that is, what guarantee they have of pursuing further study at public higher education institutions (IPTA). I would like the ministry to respond: how many, in fact, from the projected improvements and the rebranding that has been carried out? Perhaps there is recent data on what percentage go on to study at IPTA, so that at least this gives more of a rebranding showing that, with Form 6, they also have the chance to enter university. Please go ahead.

Thank you, Mr Speaker. Thank you, Honourable Member for Sungai Besar. I do not deny the capability and ability of Form 6 students in our schools. For the information of the Honourable Member, according to the data we have at present, on average nearly more than 40 per cent of STPM students succeed in pursuing further study at local public universities. This percentage does not include STPM leavers who continue their studies at private higher education institutions (IPTS) and other institutions in the country and abroad.

That means 40 per cent of STPM students go to IPTA; there are still many other STPM leavers who choose other fields and other institutions. For the information of the Honourable Member also, almost all courses offered at IPTA accept these STPM leavers. Therefore, in my view, the employability or future of these STPM students is good, provided they are fully dedicated to ensuring they obtain excellent results and can secure places at IPTA in our country. Thank you, Honourable Member, thank you, Mr Speaker.

Nik Mazian bin Nik MohamadPAS · PRPasir Puteh · questionEN

10. Dato’ Dr. Nik Mazian Nik Mohamad [Pasir Puteh] asks the Minister of Women, Family and Community Development to state how many extramarital births there have been since 2010, and what efforts the ministry has made to address this problem.

Datuk Hajah Azizah binti Datuk Seri Panglima Mohd. DunUMNO · BNDeputy Minister of Women, Family and Community Development · BeaufortEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah.

Datuk Hajah Azizah binti Datuk Seri Panglima Mohd. DunUMNO · BNDeputy Minister of Women, Family and Community Development · BeaufortEN

Mr Speaker, thank you. The Ministry of Women, Family and Community Development, through the National Population and Family Development Board, or LPPKN, does not have specific data on extramarital births, cases of baby dumping, underage pregnancy, sexual abuse and out-of-wedlock pregnancy, because LPPKN focuses more on preventive intervention programmes, namely providing knowledge and skills in education, family life and parenting, as well as programmes relating to reproductive health and sexuality for adolescents, families and the community. Based on the definition of the National Registration Department (JPN), extramarital birth refers to the birth of an illegitimate child. Statistics on the number of registrations of illegitimate children from 2010 to 2015 total 323,047 babies. However, in order to address issues relating to adolescents and family matters, LPPKN also refers to data from the Ministry of Health Malaysia (KKM), the Royal Malaysia Police (PDRM) and social agencies concerned with the issue, through reported cases. This also includes cases of adolescents handled at Department of Social Welfare (JKM) institutions and NGOs, as well as adolescents receiving antenatal care at KKM health clinics. According to the Ministry of Health Malaysia, the number of cases of pregnancy among unmarried adolescents from 2012 to 2015 totalled 16,270 persons. Based on statistics on pregnant adolescents from the State Health Departments (JKN) for 2012 to 2015, the statistics for pregnant adolescents in the top three states are:

| STATE | TOTAL (PERSONS) | |--------|-------------:| | Sarawak | 5246 | | Johor | 2427 | | Selangor| 1603 |<END_TABLE_MARKER>

Therefore, the National Reproductive and Social Health Education Policy and Action Plan (PEKERTI) 2009, which was introduced, aims to produce individuals who are knowledgeable and have positive attitudes in the fields of reproductive and social health. The ministry, through the National Population and Family Development Board, has implemented various education programmes to educate and raise awareness among adolescents and parents about extramarital sexual relations and to improve adolescents' knowledge of reproductive health, as follows. These programmes are carried out as both short-term and long-term measures. First, the Kafe@TEEN Adolescent Centre under the LPPKN PEKERTI Programme has set up 16 Kafe@TEEN adolescent centres in 10 states, namely Kedah, Penang, the Federal Territory of Kuala Lumpur, Negeri Sembilan, Melaka, Johor, Pahang, Kelantan, Sarawak and Sabah. The concept of the Kafe@TEEN Adolescent Centre is adolescent-friendly and aims to increase access to information and reproductive health services among adolescents aged 13 to 24 years. Kafe@TEEN Adolescent Centres also offer health services, counselling services, psychological services and other educational programmes. Up to June 2016, a total of 21,233 adolescents had received reproductive health services from Kafe@TEEN. Second, the PEKERTI@PLKN Programme. A total of 1,303 National Service Training Programme (PLKN) trainers were trained in preparation for teaching sessions, and so far, up to 2015, a total of 267,131 PLKN trainees have benefited from this programme. Third, the PEKERTI@Sekolah Programme. At school level, the reproductive and social health education programme, also called PEKERTI, has been carried out for special education students, Standard Six students and Form Three students. A total of 683 teachers were trained from 2012 to 2015. As a result, a total of 10,025 students from 141 schools have benefited from this programme. Fourth, the PEKERTI@Institut Programme. In 2015, the PEKERTI programme was further expanded to community college students through the implementation of the PEKERTI@Institut Pilot Programme. A total of 31 lecturers from 14 community colleges throughout Sabah and Sarawak were involved in the PEKERTI Module Train-the-Trainer Workshop.

Datuk Hajah Azizah binti Datuk Seri Panglima Mohd. DunUMNO · BNDeputy Minister of Women, Family and Community Development · BeaufortEN

As a result, a total of 334 community college students have gained the knowledge and skills to avoid and reduce risky sexual behaviour that may lead to unplanned pregnancy, sexually transmitted diseases and HIV infection. Fifth, PEKERTI@IPGM. LPPKN also collaborated with the Ministry of Education Malaysia through the Malaysian Teacher Education Institute (IPGM) in 2014 to train IPGM lecturers across Malaysia to implement this PEKERTI programme for prospective primary school teachers. Up to October 2015, a total of 2,118 lecturers and prospective physical and health education teachers from 25 IPGM campuses had attended this PEKERTI programme. Sixth, PEKERTI@Komuniti. This educational programme was also expanded in 2014 to cover residents of institutions such as Sekolah Tunas Bakti, Taman Sri Puteri, children's homes, student character-building hostels, fully residential school students, adolescents and parents in the People's Housing Programme (PPR) areas, and community leaders such as Rukun Tetangga. This effort is for early prevention among high-risk groups. Overall, a total of 55 programmes were carried out from 2014 to December 2015, involving 2,257 participants from among adolescents and parents. This year, up to August, 46 programmes involving 2,339 adolescents and 12 programmes involving 736 parents have been implemented. The ministry believes that with all the steps and initiatives undertaken jointly by government agencies, non-governmental organisations (NGOs) and the community and society, we can curb the phenomenon of unhealthy sexual behaviour among adolescents, and thereby curb the increase in cases of babies born out of wedlock in Malaysia, insya-Allah. Thank you.

Thank you, Mr Speaker, thank you to the Honourable Minister for the very lengthy reply and the programmes carried out by the government to address social ills. This is a major problem, and we see here that there are, one could say, far too many, more than 323,000 children born out of wedlock within five years. This also shows that the state of our society, which is free and overly liberal, and free relations between men and women, may be too widespread in our society, to the point that it causes many problems faced by all of us. My question is this: we know that usually things like this relate to what in Islamic terms is zina. Are we afraid to use this word, this word “zina”, that is, sexual relations outside marriage, such that this word should be used more commonly so as to instil fear, especially among all young people?

When we say zina, one knows that the consequence of zina under Islamic law is 100 lashes for those who are unmarried, or for those who are married, the punishment is death. Death. That is in this world. In the hereafter, it is hellfire. It is a major sin. This is something that can instil fear in anyone who wishes to do things that can cause these social problems. So, does the government, in its many programmes, with all their various aspects, instil this understanding in our young people and also in older people? Parents should look after their children so that, “Qu anfusakum waahlikum nara”, “Protect yourselves and your families from the fire of hell”, by raising this awareness. Thank you.

Thank you, Mr Speaker, and thank you also to the Honourable Member for Pasir Puteh. Regarding the use of the word zina, I believe that the Islamic Religious Departments in the states throughout our country certainly have particular courses. Not only for children but also for parents. I believe and am fully confident that this word is indeed used.

On our side, our courses, our PEKERTI courses, also emphasise religious knowledge. One of those included. I believe that this matter is also further emphasised to children who are Muslim, the terms mentioned. However, I would like to ask everyone here not to rely solely on the government to carry out this duty and responsibility. This is because in such matters, it must involve everyone as a whole. Parents are the primary persons to provide education to their children. At community level, at surau level, at mosque level, all of this requires cooperation from the mosque committees, with all their very essence. They must organise such programmes for our society. We have many ustaz; I believe that among them there are also many ustaz and ustazah whom we can work with in tackling this problem. This problem is our shared problem. It transcends our political beliefs. Therefore, it is very important in this effort that we work together to ensure that our children in the future do not get involved in matters that we feel should not happen among our people. However, I would also like to emphasise here that when we mention 300,000 just now, referring to these children born out of wedlock, not all of them are necessarily those born outside marriage. However, because there may be problems regarding the solemnisation of marriages, perhaps abroad and in other places, which do not go through the system that has been established, when they register the marriage, they are then also included as illegitimate. Perhaps we will also study this number. I have also just discussed with officers how we can overcome this problem and obtain a proper definition, Honourable Member and this august House. Thank you.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Yes, the Oral Question and Answer session for this morning is concluded. Under Standing Order 12(1), I invite the Honourable Minister to move the motion. [Time for Questions for Oral Answer has ended]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Thank you, Tuan Yang di-Pertua. I respectfully move to proposeEN

"That, pursuant to Standing Order 12(1), the sitting of the House today shall not be suspended until the debate and decision at the Committee stage on the Ministry of Natural Resources and Environment, the Ministry of Energy, Green Technology and Water and the Ministry of Federal Territories for the Supply Bill 2017 and the Development Expenditure Estimates 2017 are completed, and thereafter the sitting of the House shall be suspended until 10 a.m. on Thursday, 17 November 2016."

Datuk P. Kamalanathan A/L P. PanchanathanMIC · BNDeputy Minister of Education · Hulu SelangorEN

I beg to support.

Deputy Speaker (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Members, I now put the question to the House for decision. The question is that the motion as moved be agreed to.

[Motion put and agreed to]

Bill — Supply Bill 2017 and Development Estimates Motion 2017 CommitteeBill

The Order of the Day was read to resume consideration of the "Supply Bill 2017 and Development Estimates 2017 in the Committee of the whole House" [Sixth Day] [House in Committee] [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) chairs the Committee]

Bill — Supply Bill 2017 and Development Estimates Motion 2017 Committee — Head B.23 [Schedule] - Head P.23 [Development Estimates 2017] -Bill

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Head of Supply B.23 and Head of Development P.23 under the Ministry of Natural Resources and Environment are open for debate. The Honourable Member for Kuala Kangsar.

Thank you, Mr Chairman. I refer to Item 010200 – Natural Resource Management, Item 010300 – Environmental Management, Item 040000 – Minerals and Geosciences, Item 060200 – Environmental Education and Awareness and, finally, Item 090100 – Marine Parks. [Mr Speaker chairs the Committee] Mr Chairman, Malaysia is highly dependent on river water. As much as 90 per cent of Malaysia's water resources originate from river flow. According to the report of the National Water Resources Study 2000/2050 by the National Hydraulic Research Institute of Malaysia (NAHRIM), five states, namely Kedah, Melaka, Perlis, Pulau Pinang and Selangor, are considered vulnerable and have begun to experience river flow deficits since 2010. Compounding the situation is water pollution caused by sewage waste at 47.8 per cent, in addition to changes in rainfall distribution and rising sea levels.

Among the main challenges to water resource management is that Malaysia has a high rate of Non-Revenue Water (NRW). Malaysia's NRW rate is 36.6 per cent. This rate is higher compared with Thailand at 25 per cent, France at 26 per cent and Singapore at five per cent. This NRW loss has caused losses in the production cost of the water industry amounting to RM2.5 billion. I would like to ask the ministry what strategic plans the ministry has to reduce the NRW rate in order to ensure the sustainability of water resources in Malaysia. Now I refer to Item 010300. Malaysia is a country with diverse natural resources. In Malaysia there are about 15,000 species of vascular plants, with about 8,300 species in Peninsular Malaysia and about 12,000 in Sabah and Sarawak. Faunal diversity is reflected in 307 species of mammals, of which 30 species are found only in Malaysia. As hard as it is to admit, the development and progress that Malaysia has achieved, whether we want it or not, the future will be the main enemy of efforts to preserve biodiversity in Malaysia. But that is the reality. The transition from an agricultural country to a developing country that is catching up to become a high-income nation has largely made our biodiversity a trade-off for development. Let us just look at what has happened to our forests. From 2000 to 2012, Malaysia lost 14.4 per cent of its forests, and this rate is worrying. I would like to record my congratulations to the Sarawak State Government for the efforts of the Chief Minister of Sarawak, who has been very active in helping and also in combating illegal logging in the state.

My question is, what is the government's plan to harmonise the vision of sustainable development at federal, state and local government levels to ensure that efforts to manage biodiversity achieve their targets? Item 040000 – Minerals and Geosciences. Mineral resources are an important natural resource in our lives. They are formed through processes that take thousands or millions of years. Mineral resources are the main material basis for social self-reliance and the development of human civilisation. In a presentation titled 'Importance of Establishing Mineral Resource Database - Case Study: China Mineral Resources Potential Assessment Project', several importance points were outlined for having a database on the country's mineral resources. Among them are: (i) developing trends in new energy use and carrying out strategic planning to develop the future mineral resource base; (ii) providing a scientific platform for studying and drafting the country's human resource management strategy and long-term socio-economic growth plans; and (iii) controlling all procedures for the development and use of mineral resources to reduce damage to the environment and the country's mineral resources. In the RMK-11 strategy paper, it has already been acknowledged that information and data to support the management and rehabilitation of natural resources are insufficient. In addition, data on mineral resources and the results of mineral resource studies are kept by various agencies but are not widely disseminated. My question to the ministry, and I would like to ask, is whether the government already has a specific database for storing data on mineral resources? If not, I urge that it be expedited. Second, does Malaysia have sufficient expertise in the field of mineral resource exploitation and study? Next, Item 060200 – Environmental Education and Assessment. One thing we must admit is that as long as humans interact with the environment, environmental issues will exist. This also means that the level of understanding and public awareness of environmental problems is an important factor if we want to bring positive change to the environment in Malaysia.

I would like to congratulate the ministry on its efforts that have placed the country among those that are sensitive to helping with environmental matters. Firstly, environmental education for most schools in the form of integrated campaigns. Since 2005, the National Strategic Plan for Solid Waste Management has been introduced, under which we held the Go Green campaign, namely reduce, reuse and recycle (3R), and plastic-bag-free days. Malaysia also launched a nationwide campaign to plant 26 million trees by 2014. In 2013, Malaysia also joined the Earth Hour campaign, and the response was very good. My question is, how effective are these environmental campaigns organised by the government? I see that they have many benefits but must be further intensified. Second, does the government conduct any studies on the increase in public awareness levels of each campaign that has been implemented? Lastly, Item 090100 - Marine Parks. This year Malaysia opened the largest marine park in the country, namely Taman Tun Mustafa, covering 1 million hectares. It has 250 coral species, around 360 fish species, endangered green turtles and dugongs, as well as primary rainforest, mangrove swamps and seagrass. I feel that our marine parks are constantly facing threats not only from the El Niño phenomenon but also from sedimentation, I may add, mangrove felling and fishing using explosives and cyanide, as well as the rubbish in the sea and algae growth that chokes the growth of coral reefs. If these matters are not controlled, the government's integrated efforts under any plan will not succeed. I would like an explanation from the ministry: what incentives does the ministry have to encourage the efforts of NGOs involved in the rehabilitation or preservation of coral reefs in our marine parks? I have a proposal, which is proposals to act in an integrated manner with countries that are very expert in protecting these marine parks, such as the USA, which is actively working on this with high-resolution satellite imaging, GPS technology, digital maps of Waze, and a coral reef boarding system used to help the ministry's efforts to rehabilitate these coral reef areas. We need to become champions in this effort in the region so that the country's image in environmental matters is excellent. Thank you, I also support.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Bangun]

Mr ChairmanEN

Please. Let the Honourable Member for Bandar Kuching go first. After that, the Honourable Member for Kinabatangan.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

Thank you, Mr Chairman. I would like to speak on Item 040000 – Minerals and Geosciences under Supply B.23. All this time we have understood that mining falls under the jurisdiction of the state, particularly for Sarawak. I have been informed that this year the Department of Mineral and Geoscience has been controlling the export of rocks and also the export of clay from Sarawak, and sand too. Only a week ago, a trader, producer or exporter of clay had chartered a large ship to load and sell clay exports to a country in the UAE. When the ship arrived, customs informed him that he needed to obtain a permit from the Department of Mineral and Geoscience before he could export this clay. Mr Chairman, in the end, due to insufficient time, the clay- this ship was sent back, empty vessel. This is not the only matter- what is more important is that the power to manage the business or sale of minerals and land, these bricks, falls under the power of the Sarawak state. I am very disappointed because for two years the Sarawak State Government has been proclaiming that it wants to defend state rights. The autonomous power of the state over anything under the state's jurisdiction.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

However, we have a Minister from Sarawak who has taken up the post of Minister of the Ministry of Natural Resources and Environment, and the Department of Mineral and Geoscience falls under the Ministry of Natural Resources and Environment. However, although this is a policy that is a violation of state power, he has allowed this policy to be implemented.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

If this policy is extended, then the sale of minerals, rocks, sand and clay from Sarawak will be controlled by a federal government department. This is completely unreasonable and completely inadequate compared with what the Chief Minister of Sarawak has said. I hope that the Honourable Minister of Natural Resources and Environment will not forget that, apart from holding the post of Federal Government Minister, he is also a Sarawakian and must defend the rights and everything enshrined in the Federal Constitution, protect and defend the interests of the state of Sarawak. Do not allow federal government departments to control the business activities, export and management of minerals and natural resources of the state of Sarawak, to the extent that the commercial activities of the people of Sarawak are affected. I think the Honourable Member from 'Sri' Gading, and the Honourable Member for Sri Aman will also- the Honourable Member for Mas Gading, and the Honourable Member for Sri Aman also agree with me on my comments on this matter, and I hope they can convey this message to their colleague, namely the Minister of Natural Resources and Environment. This is so that- let us protect our Sarawak's interest. Do not let the power of the state of Sarawak be compromised. Therefore, I hope that in the reply, the Honourable Minister himself can come and provide an explanation, and an answer as to why this new policy is being implemented this year, after what the Chief Minister, who is his boss, the President of his party, has said, that we want to defend Sarawak's rights. This is not only that a permit must be obtained from the Department of Mineral and Geoscience for the export of clay and rocks alone, but there is also a fee to be charged. A fee of more than RM1 per tonne will be charged on the export of these materials. This is not fair to us Sarawakians and also not fair to the Sarawak State Government. Therefore, I hope the Minister can come himself. Do not let what the Chief Minister said a few months ago, that the MPs in Sarawak, MPs in Parliament are sleeping, go unchallenged, so that Sarawak's rights, Sarawak's privileges...

Eh, take that back, don't accuse like that.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

Sarawak's privileges have been eroded and violated.

Ya betul.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

...by the Federal Government, but they sit in Parliament just sleeping, doing nothing. This is not only sleeping, but he is implementing this policy which erodes and violates the rights of the state of Sarawak. Therefore, I hope the Minister of Natural Resources and Environment, the Honourable Member from Santubong, can come himself to answer this question, so that we can get a more accurate explanation. The second point I want to mention concerns drainage and flood channels. I want to ask, what has happened to the flood mitigation canal project being carried out halfway in the Kuching city area. Kuching city is now frequently hit by floods due to heavy rain. Therefore, I see that there is no allocation under the expenditure items, in the development allocation... [Interjection] Who said it is not necessary? Who said it is not necessary?...

The Honourable Member for Putatan.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

Oh, the Honourable Member for Putatan is the one who said it is not necessary. I think his colleagues from Sarawak will not agree with this. All of this is for the good of Sarawak. That is all, thank you.

Mr ChairmanEN

The Honourable Member for Kinabatangan.

[Bangun]

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Sit down, the Honourable Member for Putatan [Laughter] Thank you, Mr Chairman. Mr Chairman, I would like to touch on several matters, namely river development plans, national water resource development, environmental management, and drainage and flood channels. Mr Chairman, whether we realise it or not, the world we live in today is no longer safe for us to live in. This is because, day by day, it is increasingly eroded and polluted by greedy human hands, who only think of material things and their own interests. They do not realise these actions, Mr Chairman, have repercussions for all the people of our country. The question is, is the ministry ready to face erosion of this kind? What are our steps to prevent it? For example, we have been blessed with various kinds of rivers, the Sarawak River and the Kinabatangan River. These two rivers, Mr Chairman, the Sarawak is the largest river in Malaysia, the Kinabatangan is number two. However, these rivers are being polluted. In Kinabatangan, the Kinabatangan River, which was once 575 kilometres long, was clear, but now it looks like plain Milo. So, I see no plan from the ministry. How is it going to solve this problem? Because this river is a gift entrusted by God to the government, to us, continuously...

There is, but there is no money.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

So- hah, this is a big problem, Honourable Member for Putatan [Laughter] How life is- previously there were many fish and prawns in the Kinabatangan River, now they have decreased. This is because toxic waste from palm oil mills is dumped into the Kinabatangan River. The banks of the Kinabatangan River have been planted with oil palm. There is no action. At one time, perhaps during my Second Term as a Member of Parliament, when the Minister was the Honourable Dato' Azmi Khalid, I brought him to Kinabatangan, we held a roadshow, we felled the oil palms on the riverbanks, but beyond that there has been no further action. So this shows, Mr Chairman, that the next generation of our nation is no longer safe to inhabit this world. The galaxy is nearly eroded and lost. The ozone has thinned and will burn this earth before long. Therefore, I ask the ministry to give me an answer, comprehensive steps that can guarantee that my people in Kinabatangan, their generation's lives are secured, and are not polluted by undesirable pollution. One more point is drainage and flood channels. It is true that I agree with my friend, the Honourable Member for Kuching. Our city now, whenever it rains for one day and one night, will mean the city will be submerged by floods. Development is increasing, roads are increasing, but water drainage is not increasing. Therefore, planning between this ministry and the city councils should be aligned. If it is not aligned, during the monsoon season we may see Kuala Lumpur also submerged one day, and perhaps other cities too. So this is very distressing. Many cities in the world, big cities, but even with heavy rain for two or three nights they do not flood. However, in Kuala Lumpur- this is indeed a problem. When the rain continues, it will continuously cause the city to be submerged by water.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

So, in my view this is a matter that the ministry must treat seriously. Studies: if we do not have expertise in these fields, then we must call in experts from wherever they are to help us solve the problems we face. One more thing, Mr Chairman, namely how the environment will be restored, because after the monsoon rains we will face haze and so on. I see that we already have existing laws that are quite good. However, when implementing those laws we do not get stuck there. We are halfway. We have lost sight of the halfway point. This is because I do not see anyone being charged in court for this pollution. Factories that emit clouds of smoke beyond the limit are not charged. I do not know. I want to know how many operators have been charged and hauled before the courts by government ministries. Otherwise, if we go to China, Mr Chairman, we struggle to breathe. Most cities in China are like that. Because of pollution, perhaps because their population is simply too large, the pollution there is indeed quite severe. Only...

Mr ChairmanEN

The Honourable Member for Kuala Selangor, the Honourable Member. Stand at the back.

Thank you, Mr Chairman. Thank you, the Honourable Member for Kinabatangan. I agree with what the Honourable Member for Kinabatangan has stated, namely on the matter of the environment. Only, I would like to ask the Honourable Member for Kinabatangan's view. I admit that at the level of the Federal Government, we have various laws, but development and pollution continue to occur, as if these laws are not respected and feared. I would like to ask the Honourable Member for Kinabatangan's view: is it that the fines are no longer sufficient, or the enforcement of the laws is not strong, or is it that they seem to disregard the role of the Federal Government because matters relating to land, rivers and so on fall under the state governments? I respectfully seek the Honourable Member for Kinabatangan's view. Thank you, Mr Chairman.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

That is a good question from the Honourable Member for Kuala Selangor. This is exactly why we need coordination between the Federal Government and the state governments. Because their roles almost overlap. So, when something worrying happens, the state government says, "Oh! This is not us, this is the Federal Government." We complain to the agencies, "Oh! This is not our field, this is the state government's field." So here, coordination is truly necessary. Because without coordination, it means the future of our nation's children is not assured. That is why, Mr Chairman, when we visit countries abroad, in Europe for example, we see how they look after their rivers. Their rivers can become recreational centres, and the water is clear. Here in Kuala Lumpur, Mr Chairman, look at the water. The Sungai Kuala Lumpur should be able to be restored, it should be able to be beautified, but we do not focus on that. So, I am not sure whether this falls under this ministry? Under the Ministry of Federal Territories? But the point is, whether it is under the Ministry of Federal Territories or this ministry. They must collaborate and cooperate to improve the quality of water and our riverbanks. Together. Make a Blue Ocean Strategy. Then the people will not keep wondering. The opposition will not attack the government because we manage things well. But if we manage things well, there is no need for the opposition to speak up. We too would be saying that the government has forgotten its responsibility to develop, which is supposed to be their task and role. In my view, a beautiful city is one where its tributaries are preserved. The water is clear and clean, and we can enjoy recreation with peace of mind. But if we go for recreation along riverbanks where the water is unpredictable, that is not good. We are far too stingy in spending to improve the quality of this environment. In my view, that is a truly regrettable matter.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

So, Mr Chairman, although I am not too pleased, I ask that the ministry and any agencies involved cooperate to ensure that the conservation of the environment and the development of our rivers can be improved. Thank you, Mr Chairman.

Mr ChairmanEN

The Honourable Member for Bukit Bintang.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Thank you, Mr Chairman. I refer to Item 050000 – Forestry, under Supply Bill 23, Ministry of Natural Resources and Environment, where a total of RM30,973,800 has been allocated for the 2017 Budget, which is a reduction from the 2016 allocation of RM32,353,200. This means the Forestry Department is forced to restrict reforestation work for the national forestry sector. What more is to be distributed to each state, so the allocation becomes smaller and smaller. In the Federal Territory, in my constituency of Bukit Bintang, there is the Bukit Nanas Forest Reserve. The Bukit Nanas Forest Reserve is the only forest reserve in the world within the city of Kuala Lumpur. This forest reserve, it was first opened in 1906. Its original area was 17.5 hectares, and now only 9.3 hectares remain because it is squeezed by the concrete jungle. This forest area, as I said earlier, is one of the forests that has become the Taman Eko Rimba, a natural primary forest type explored under one terminology, which is always visited by visitors from within the country or from abroad. It is very suitable for relaxing and enjoying the peace and beauty of nature. My colleagues and I, Members of Parliament from Seputeh, Cheras and Segambut, once visited the Taman Eko Rimba Bukit Nanas, and we were informed that only an annual allocation of RM200,000 is given to the Kuala Lumpur Federal Territory Forestry Department to manage the Taman Eko Rimba Bukit Nanas. This is a very small allocation, barely enough to clear a cough on the staircase, whereas this forest park has the potential to be developed more vigorously to attract many tourists to visit there. Because in Kuala Lumpur we lack products for tourism, I feel that developing the Taman Eko Rimba Bukit Nanas could become one of the products to attract more tourists from abroad.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Point of clarification. Thank you, Mr Chairman. The Honourable Member for Bukit Bintang. That day, when all four Members of Parliament for Kuala Lumpur went to visit the Bukit Nanas forest reserve, I only then realised that we have been living in Kuala Lumpur for more than half a century. Only then did we realise, wow! We have a forest reserve in Bukit Bintang, in the heart of our city. I believe none of these honourable Members have ever been to that place, and I think the opening hours for visits to the forest reserve are working hours, it closes at 5.30 in the evening. For me, whoever has time during the day should go and visit that place. So, in my view, if we want to promote the public, especially children, to love the environment, we should make the opening hours later. Perhaps the department concerned should install lights there so that after work, many people can go there to exercise.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I was also surprised when we asked the officer there how much was lacking, because we visited that place. This is because it is said that next year, anyone who wants to enter will have to pay. Meanwhile, for foreigners, foreign tourists must pay RM40 to see the forest, to enter the forest. Who would go? The shortfall is only RM200,000. A sum of RM200,000 is actually the sort of thing that Telekom Malaysia, the many big hotels, Khazanah and so on could easily cover. In fact, the Forestry Department and the ministry should seek donations from these big companies...

Mr ChairmanEN

The Honourable Member for Seputeh, the Honourable Member for Seputeh, the Honourable Member for Seputeh.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

What is the view of the Honourable...

Mr ChairmanEN

Hah, like this.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

...Member for Bukit Bintang on my proposal that we ask the GLCs in the surroundings to support...

He had not drunk that morning. He had not had his morning drink.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

...the forest reserve.

This is not a DAP ceramah, you know.

Mr ChairmanEN

He has completely forgotten the Honourable Member for Bukit Bintang sitting over there.

Tuan Fong Kui LunDAP · PHBukit BintangEN

The Honourable Member for Seputeh, his speech has merged into my speech. Although there are suspension bridges and towers for observing the forest, they are not sufficient. Basic facilities such as improving forest trails, and signboards introducing the tree species within the forest, could attract more tourists to visit. Therefore, I propose that the annual allocation for maintaining and managing this forest reserve, as well as for developing and adding to it, be increased by at least RM1 million. This is because, apart from visiting the Menara Kuala Lumpur, which is next to it, where tourists can view the panorama and scenery of Kuala Lumpur City, tourists can also visit the Taman Eko Rimba Bukit Nanas in one single trip. Mr Chairman, I refer to Item 060000 – Environment, which received an allocation of RM93,622,300, whereas in 2016 the Department of Environment received an allocation of RM122,672,600, meaning the department's allocation was reduced by RM29 million. Then we talk about how the Department of Environment is less effective and not firm in performing its duties and responsibilities. There is an increase in cases of environmental pollution, the disposal of toxic materials into rivers and water sources, whereas the department's annual allocation keeps shrinking. Therefore, how can the enforcement and monitoring division work effectively? In Kuala Lumpur, cases such as nuisance, noise from entertainment centres and smoke from restaurants are often publicised. We are also constantly troubled by open burning in neighbouring Indonesia, which makes our country's air hazy and endangers health. What steps will the ministry take to overcome this problem? The Ajinomoto factory at Jalan Kuchai Lama often emits foul fumes from its factory and pollutes the surrounding air. I would like to ask the Honourable Minister, can the ministry take action against this company, because many complaints have been received from the people living around that area. That is all, thank you.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Wait. The Honourable Member for Bukit Bintang, regarding the Ajinomoto factory, I have asked many times to meet the company's manager, but I have not been given a hearing. Perhaps the ministry...

Go and chat, chat outside, chat over there.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

...can send officers to come and investigate the smell and also what is being discharged into the river and the nearby ponds. What is the view of the Honourable Member for Bukit Bintang?

Mr ChairmanEN

The Honourable Member has five seconds to answer, five seconds.

Tuan Fong Kui LunDAP · PHBukit BintangEN

The Honourable Member for Seputeh, I agree with what the Honourable Member for Seputeh said, asking the ministry to take action on the complaints we have raised. Thank you.

Mr ChairmanEN

The Honourable Member for Kota Samarahan.

Puan Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Thank you, Mr Chairman, for giving me the opportunity to join in the debate at the Committee stage for the Ministry of Natural Resources and Environment. I now move directly to Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. Mr Chairman, the phenomenon of high tides and continuous heavy rain every year in our area often causes floods, both existing floods and also flash floods in residential areas. For the state of Sarawak, especially in the districts of Kuching, Serian and Samarahan, in the first two months of this year we have experienced four floods. Kota Samarahan is a new town that has recorded growth not only in terms of the education industry and commercial centres, but now it is growing rapidly with settlements and housing estates, which have to some extent affected the drainage system, both drains and rivers, causing many flash floods and floods in those areas. Apart from high tides and heavy rain, these floods are also caused by a lack of river maintenance activities and a lack of awareness among the community about the importance of rivers in our efforts to ensure that our town's water system is implemented well and properly. Therefore, I would like to ask the ministry, in our effort to ensure that the flood mitigation system is implemented in this area, what efforts have been carried out by the ministry to ensure or to foster public awareness regarding the issue of river conservation, especially at school, village, district and division levels, so that the sustainability of rivers and the environment in this area continues to be properly preserved. Mr Chairman, a sum of RM250 million has been allocated for the flood-affected areas of Kuching, Sibu and Kota Samarahan. I would like to ask the ministry when this flood mitigation project will begin? How long, or what period, is required to complete this flood mitigation project? I feel that if the flood mitigation project and river maintenance process are arranged very well, God willing, flood conditions in the Samarahan and Kuching areas can be avoided in the future. Likewise, based on Item 16700, I would like to ask the ministry, what is the status of the Urban Drainage programme, namely upgrading the drainage system in the area of SK Jalan Muara Tuang, Taman Uni-Garden in Kampung Tanjung Bundong Phase 3, because this matter was approved this year. Mr Chairman, I would also like to ask what is the status of the programme to upgrade the Sungai Kampung Endap, which every year without fail floods. So that this area can be preserved and the residents can have continuous comfort and well-being.

Puan Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Mr Chairman, next, Item 14500 – Upgrading Infrastructure and Urban Drainage, Flood Mitigation, which allocates RM12.9 million. In relation to this matter, I would like to draw the ministry's attention to the issue of coastal erosion in the Asajaya area. The Asajaya area is a peninsula located in a low-lying position on the edge of the sea, where in the 1980s embankments or barriers were built to prevent water from the sea and rivers from reaching the village areas and also the agricultural areas. At present, the condition of these embankments or barriers is poor and dilapidated, and most of their structures have also begun to loosen. So, many applications have been submitted by us to the ministry. I hope that this year the ministry can take into account the upgrading of the agricultural embankments and the village embankment rings in the area, for the convenience of the villagers. This will ensure that the agricultural areas in the farming areas are preserved, and that the economy of the villagers can be well generated and also obtain good returns for the villagers.

Puan Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Mr Chairman, finally, Item 15100 – Coastal Erosion Prevention. This is also a phenomenon that frequently occurs in coastal and riverside areas. In the Asajaya area, we cannot escape from the phenomenon of river erosion and coastal erosion. That is why I would like to ask the ministry, what is the status of the programme to upgrade the riverbank of Kampung Tambirat, whether it has been notified to us and has received consideration. This village has experienced river erosion for nearly more than 15 years now. Many houses and many agricultural areas have already been carried away by or have followed the river current and disappeared. This not only causes problems for the village residents but also problems for the village economy. That is all, Mr Chairman. Kota Samarahan seeks support. Thank you.

Mr ChairmanEN

The Honourable Member for Kota Raja.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Thank you, Mr Chairman. I would like to touch on several items. First is Item 060000 – Environment. I would like to ask the Honourable Minister about Item 060300 – Monitoring and Enforcement at several locations. First, in Cameron Highlands. We know that in November 2014, there were mudslides and landslides in Kampung Raja, Pekan Ringlet and Lembah Bertam in Cameron Highlands, which resulted in five deaths and then had to- meaning the government had to implement programmes to ensure these mudslides do not happen again. With our allocations reduced, previously for monitoring and enforcement it was RM104 million, nearly RM104 million was allocated. This time only about RM76 million remains. So I would like to ask, will the monitoring and enforcement programme continue to be implemented as planned? I would also like to raise some complaints that the environment in Langkawi, although it has been gazetted as a geopark and so on, still has no control over development in Langkawi. I would like to ask whether the Ministry of Natural Resources and Environment has discussions with LADA so that development that causes environmental destruction, especially to the mangrove forests, is controlled on Pulau Langkawi. I would also like to bring up Item 070000 – Wildlife Protection and National Parks, Item 070100 on conservation. What is the government's action regarding the many monkeys roaming about as semi-urban or suburban areas are developed? We find that these animals roam about and there is no- we understand because their habitat has been encroached upon, but the overflow of these animals enters village areas and even housing estates, even going into houses. My own house has fallen victim to attacks by these monkeys. These monkeys are no longer afraid of humans, especially when they see women. If they see a woman, they pretend not to know. They peek in and then just smile. Sometimes I have to bring a stick, make noise and chase them away from the back or the kitchen of my house. What I worry about is the safety of children when these animals attack. Usually when we complain, the answer is that the Department of Wildlife and National Parks (PERHILITAN) will say we have to call them when the monkey comes. How are we supposed to know when it is coming? What is the government's step, I mean PERHILITAN? Must we wait for children to be preyed upon before we act? There must be an action plan. Do we want to castrate them? Or do we want to put them to sleep? What is the definitive answer? How do other countries do it? So I do not know what this is. I am worried about this matter. Next, on irrigation and drainage. I actually support what the Honourable Member for Kinabatangan said, that our towns are developing but drainage and irrigation are not expanding. Perhaps the way we plan needs to be reviewed. This must have NBOS.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

When everyone talks about NBOS, I feel that the departments do not talk to each other. For example, in agricultural areas. When house lots are developed, when they are developed or their status is changed from agriculture to housing, the only requirement is to build a drain in front of their own lot, there is none for the neighbours. If it is not developed- so when we ask, the answer is that when he develops, he must also provide drainage in front of his house. So this is something I feel has been going on for a long time. If there needs to be a change or amendment in our laws, especially at the Ministry of Housing and Local Government (KPKT), the Irrigation and Drainage Act and so on, drainage, it needs to be looked at. Take villages, especially my area, Kota Raja, which is on the outskirts of the town and is in the process of urbanisation. So when it comes to villages such as Jalan Kebun, Kampung Jawa and so on, when lots are developed, the victims are the lots nearby because he only cares about channelling water from his lot into the drain. When we ask, he says, this has been approved. The planning permission has been approved. I know this is not under the Ministry of Natural Resources and Environment, but the problem of irrigation and drainage needs to be looked at micro-level, holistically. If there is no, as people say, conversation between these ministries, the Ministry of Works, the Ministry of Natural Resources and Environment and also then KPKT, this problem will drag on. This is what we face and I sometimes wonder too. Why is it that all these drainage issues are not concentrated under one ministry so that they are easier to coordinate?

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

I also want to mention- I have a little more. Where was I? On land administration matters, actually. Item 020100 – Estate Management and Distribution Services and Item 020200 – Land Management and Legal Development. I think the National Land Code needs to be reviewed, and the ones who become victims are the village people whose land we know is agricultural land, and to change the status of that land to housing land they must apply and pay fees, and changing this status is not easy. Just to call for a survey already costs thousands, not to mention subdividing lots and so on. In the end the problem is when a piece of land, one acre or two acres, a tiny plot, is shared by siblings and their names are not on the title and so on. When the government wants to take it back for certain purposes, the problem arises there because compensation and so on will only be considered for the names on this title. I know the Minister will also answer that, "Oh! This land is under the state, so the state can change it and so on…" but the state in turn replies, "We are bound by the National Land Code…". So perhaps I feel this problem is understood and known, but what is the ministry's action, because the administration of the National Land Code Act falls under the supervision of the Honourable Minister's ministry. Thank you, Mr Chairman.

Mr ChairmanEN

The Honourable Member for Putatan.

Thank you, Mr Chairman. I actually have many items in my notes. There are 14 in total but I will not touch on all of them. However, before that, I think the most important thing is that this ministry is highly commendable because, from looking at this budget book, many programmes are indeed being implemented by this ministry. Congratulations, including to my friend from Ledang. These are all good experts. We must support this ministry. The programmes listed in this budget are indeed to overcome the phenomenon of global warming that is harming the world. Another concern of mine is that our ozone layer is thinning to a certain extent and perhaps at this time there is a hole heading towards our earth.

So the air we breathe may be toxic, and perhaps our Minister does not know whether there are experts checking the air to see what kinds of poisons and chemicals we inhale every day. We know our seawater is becoming more acidic and it is warming and damaging the coral reefs, and I see…

Clams, clams. Restoration of the reefs is already in the ministry's plan. We also see this matter, especially the water: according to experts, in 100 years the sea level will rise by 10 feet. So this endangers low-lying areas, especially the Pacific Island countries, which will be submerged by water. So our areas in Malaysia, these coastal areas, we must remember them and how we carry out mitigation and adaptation on this matter. Mr Chairman, I would like to refer to the item that mentions eKadaster. There are many items, three eKadaster items. I thank the Federal Government for giving a programme that enables the survey of customary land and native land in the states of Sabah and Sarawak. Thank you. What is not in this item, Honourable Minister, is the survey of Orang Asli land. Can Orang Asli land also be included in this programme so that the Orang Asli community does not fall behind in having land ownership, so that they can obtain land and mortgage that land to develop. This is so they can get funds, capital, as Sabahans say, "pukuk", "pukuk", yes "pukuk". They do not know about "pukuk" to develop the land owned by the Orang Asli. So Mr Chairman, you know about this "pukuk" matter. Especially the lands in resettlement areas, if possible they should be surveyed so they can be gazetted as Orang Asli customary land, and large companies should not be allowed to enter Orang Asli areas and be given ownership of the identified lands. In all places in the Peninsula, Orang Asli places should be identified so that developments, plantations for example, and gigantic companies do not encroach on Orang Asli areas. We can see that the Orang Asli are very scattered. I ask the ministry to look at this matter seriously. Another point is the wildlife protection and national parks, which has many items related to it. I hope there can be collaboration, especially on the development of the Klias peat swamp research area in Sabah. Thank you for giving only RM1 million. If possible, please add a little more, because it is not only to conserve the peat land in Sabah, Honourable Minister, but also the habitat of the birds found in the Klias area, which may be specific and species not found in other areas. This is what I know because I once held power in this area before I became a Member of Parliament. So I feel RM1 million is not enough. If possible, add a little more, and if possible also ask for collaboration from GLCs or private companies to help the government develop Klias agriculture so that it can create a tourism product there. That is it, Minister. Another is the Heart of Borneo (HOB) project of Sabah State. I think its allocation is also insufficient, only RM7 million. For areas similar to this peat land, mangrove planting programmes and suitable species. These are found a lot especially in the Beluran, Sandakan and also Lahad Datu areas. So I hope these areas are not opened up, or filled with soil for developments. Also these areas have a type of large crab that, as you know Mr Chairman, is a crab that can climb coconut trees and eat coconuts. So this is a species that is difficult to find in other places except in Semporna and in Lahad Datu, in Kunak. I have seen this crab - this is a species we should have difficulty finding in other places. I think mangrove planting should be strengthened further, improved and expanded not only in Sabah but throughout our country, Malaysia. This is very important because we also want to see crocodiles. Tourists also like to see crocodiles, Mr Chairman.

Sometimes crocodiles, crocodile meat too, is also favoured by our tourists from China. That is true, Mr Chairman. They always look for crocodile meat. In Putatan they look for crocodile meat in Putatan. I can show you that in Likas there is a market that sells crocodile meat. Not only crocodile meat, this is saltwater crocodile, not land crocodile like the Honourable Member for Kota Melaka [Laughter] [Interjection] The Putatan crocodile is in Parliament. Mr Chairman, the RM63 million for preventing river erosion is not enough. In Putatan the land has already been eroded by water. I request, I have written to the ministry several times on this matter, but what has been given is only gabions, which is not enough. If possible, please dredge the river at Kuala Petagas that is involved, because the extension of the runway of the airport in Kota Kinabalu involved sedimentation of the river at Petagas. So I ask that you please allocate funds. If not, Mr Chairman, Putatan will always be flooded. Every week there are those hit by floods, and all the property of the village people is destroyed. So who is sought after? The Member of Parliament is also sought after during every flash flood, the Member of Parliament who comes down to give aid.

How can there be enough money when the pocket of my pants is already leaking? I hope this matter can help because the Putatan area is low-lying, so besides, sea water is now also starting to rise, sea water may rise, and I got a picture from Putatan that sea water has already overflowed into the paddy areas. What I have done, Honourable Minister, is that I have made my own paddy field, I made a canal, what is it in English. Canal, canal, so we make a channel, we make a channel so that we can plant coconut and pandan. Coconut pandan, apart from paddy and perhaps other types of crops, and this canal, this channel, we can use as a way to transport goods or to carry coconut fruits, apart from transporting them by car for example. That is what I am doing, and this has already been planned for the village people who have paddy fields in my area. I hope this receives assistance, especially for areas that need maintenance of certain drains and drainage channels in this area. This is because the Putatan area is very low, Mr Chairman, as you know, so I hope the Minister himself will come down to Putatan, not far from the airport, only two or three minutes to my house. I will show you, I will bring the Minister to see the real matter, this is the reality. I hope for one more, the last one...

That's the end already.

Don't bother. Flood signal monitoring, if it can be implemented, should also be carried out in the Putatan area. With that, Mr Chairman, I respectfully move my support.

Mr ChairmanEN

The Honourable Member for Kuantan, let the woman go first.

Thank you, Mr Chairman, for allowing me to debate under Head B.23. Allow me to debate Item 060300, namely Environmental Monitoring and Enforcement. I see that the allocation for services and supplies has been cut from RM38.674 million to RM5.687 million. Mr Chairman, this cut by 1.7, 1/7 of the amount given in 2016. This greatly worries me, seeing such a big budget cut for monitoring and enforcement. This is because we know that we have many problems regarding enforcement and monitoring concerning effluent from factories and so on in the rivers. We are aware that several water treatment plants had to be closed due to effluents that we cannot control. So, when there is a budget cut under this monitoring and enforcement item, I request an explanation of how the Honourable Minister plans to ensure that this enforcement can be carried out effectively.

I wish to raise another issue under this enforcement item, concerning banned pesticides. This is the third ministry to which I am raising this issue, namely banned pesticides in Cameron Highlands. Four ministries are involved because raw water falls under the environment portfolio, and enforcement of regulatory banned poisons falls under agriculture. Yesterday I asked the Ministry of Health about drinking water. This is because I referred again to a report in the Iranica Journal of Energy and Environment entitled "Organochlorine Pesticides Residue Level in Surface Water of Cameron Highlands, Malaysia", which was published in 2015. It states that there are banned poisons (OCPs) that have been prohibited since 2002 but are still found in the water catchment area in the rivers, and, most worrying of all, there are traces in drinking water being discussed. The Deputy Minister of Agriculture denied this and said these were old, but the report states that there is new usage. So I ask how this matter is to be monitored, because long term effects will leave a very negative impact on public health. We know Cameron Highlands is a place tourists visit, and also a source of vegetables. There is a new report from experts, or professors, from UKM stating that vegetables too have cases of the banned pesticide. So I ask for an explanation from the Honourable Minister. I wish to refer again to Lynas. I was informed by a reply I received recently from the Honourable Minister that the effluent from the Lynas sedimentation pond goes to the Sungai Balok, and therefore I refer to another journal, reprinted from the Journal of Environmental Information Science. Its title is "Environmental Problem Cause by Rare Earth Refinery Processes in Malaysia, Asian Rare Earth Incident and Lynas Problem", written by Professor Yoshiko Wada. Professor Wada conducted a baseline reading study at the Sungai Balok because the Honourable Minister said that the effluence from Lynas flows into the Sungai Balok. So there is a baseline reading in November 2012, before the Lynas operation began, and a reading in November 2013, one year after the Lynas operation began. Here samples were taken from the mouth of the Sungai Balok, and it was found that there was a very sharp increase in thorium, lead, arsenic and caesium. Thorium was 4 parts per million, 4 parts per million in 2012 before the operation. After one year it was 27 parts per million. Lead was nil at the beginning before the Lynas operation started. One year after, it was 106 parts per million. Arsenic was 11 parts per million at the beginning and 63 parts per million at the end. So there is a full table here showing the effects after one year of operation, Kuala Sungai Balok. At the sediment, sample were taken from the sediments. So this is indeed worrying, because the effluence itself may not be contaminated or may be found safe or according to standards, but when it settles at the river mouth, all the heavy metals may be there. However, since Malaysia stop Lynas coalition, "Save Malaysia Stop Lynas!", an NGO in Kuantan, also wanted to take its own samples, independent sampling according to the set standards, and found that the arsenic level was double. Samples taken on 1 October and 30 October recently were also found twice over that the arsenic level was double the permitted B standard level. This is the permitted allowable amount in the effluent discharge from Lynas, the Lynas plant, from the sedimentation pond. So I ask for the Honourable Minister's explanation on this matter. Within the time remaining, allow me to touch on Item 050100 - Policy and Management, Item 050200 - Forest Operations, and Item 050300 - Forest Development. I also wish to refer to the Environmental Quality Order on prescribed activities for environmental impact assessment, that is, Prescribed Activities for Environmental Impact Assessment 2015. I would like to ask whether the ministry can lower the minimum acreage for logging. This is because it is clear that logging leaves a very negative impact on river water quality and on the environment, and also causes erosion.

The ministry has already lowered the minimum acreage for mining to no minimum acreage. I greatly praise that and I strongly agree with the decision made by the ministry. However, I would like to ask whether the minimum acreage for logging and agriculture can also be lowered. That is, if possible, we should implement EIA strictly. This is because we know that in Cameron Highlands, for example, there have been mudslides caused by uncontrolled agricultural activities. The way they use the reason of changing forest status to plantation is sometimes legal, but not ethical, Honourable Minister. Not ethical. Too much land has been changed in status from forest to plantation, causing floods and so on. So I want an explanation on this matter. Another question I want to ask: when there is illegal logging, what is the best action we should take when illegal logging occurs? Should we rehabilitate the forest as quickly as possible, or use it as a reason to create plantations? This is like what happened in the area of the Menteri Besar of Pahang, as reported in this newspaper... [Shows newspaper cutting] Illegal logging of 376 hectares occurred, and then the Menteri Besar, the State Assemblyman (ADUN) there, immediately used that reason to create plantations for the people because there was illegal logging. I am worried it can be misused. When residents objected, only then did he say he would do an EIA. I want to know what procedure the ministry should take under this item, under this forestry item? What is the appropriate, best practice when such illegal logging occurs? Thank you, Mr Chairman.

Mr ChairmanEN

The Honourable Member for Lenggong.

Thank you, Mr Chairman, for giving me the opportunity to debate the estimates of the Ministry of Natural Resources and Environment at the Committee stage. Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation and Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage under Development Head 23. The phenomenon of big high tides that has hit the country has to some extent affected several states in the country, and this phenomenon of large-scale high tides brings high waves and strong gusts of wind. This is one example of a phenomenon that can cause major floods and affect local communities in terms of loss and damage to property and homes. Among them, we can also see flash floods occurring, for example in the capital city in May last. It also affects main roads, causes traffic congestion, and of course involves losses in terms of property, vehicle damage and so on. Therefore, urban irrigation and drainage, as well as the Flood Mitigation Plan in affected areas, need to be improved and expedited. Therefore, I want an explanation from the Honourable Minister: with such marked changes in weather, do we still use old data from time to time, or do we shift towards preparedness based on today's climate change? Based on the budget highlights for this year, which is 2016, RM730 million has been allocated and approved to implement Flood Mitigation Plan projects across the country. Therefore, can the ministry list the projects that are being and have been implemented? I also take this opportunity, representing the people in my area in Lenggong, to seek information on the Lenggong District Flood Mitigation Plan, which I understand has been approved and whose committee-level meetings have been held several times.

On this matter too, I want to request that the ministry, especially at district level, in the district drainage department offices, review the methods and ways of widening rivers. This is because, from my experience as a people's representative, the same method has been used since long ago, causing rivers to get bigger and involving the acquisition of individuals' land and so on. This creates objections, and therefore, is this the only method? Is there no other method? Every time they dig the river, bury it, and then it is covered again. Dig again, bury, covered again. Repeated work, the same money is spent, yet the problem still is not solved. So I hope this matter will be studied. It happened in my Parliamentary area and I ask that this matter be examined by the relevant departments so that every ringgit we allocate truly has a major impact, especially in solving the problems and issues of the people. Next, how does the ministry tackle the problem of irrigation in urban areas? Is there cooperation with other ministries, especially to overcome flash flood issues and so on, which I understand cost a very large amount of money? Next, Item 060000 – Environment and Item 060200 – Environmental Education and Assessment. We also know that the rapid development, especially in Malaysia, through the increasing growth of ecology and the expanding urbanisation process across the country over the last few decades, has brought about marked changes in the physical environment as well as in people. This situation arises when some of us do not give proper consideration to the conservation and preservation of the environment in implementing every development project, as should be entrusted by the government, and ultimately causes things that should not have happened. How does the ministry examine and take into account such matters, so that every development project built does not affect the ecosystem and the environment? Following on from that, I also think the aspect of environmental management and education has become an important field in life today, given that many issues and environmental crises are hotly discussed and become topics of conversation, especially on social media and so on. Likewise, air pollution, river pollution, noise and so on have a significant impact. Among them, of course, they threaten human health, damage property, and also threaten plants and animals. For example, when there is a haze issue, for instance. It has been 18 years, if I am not mistaken, since this happened, and it results from open burning by our own society, or burning done by neighbouring countries, which causes many effects in schools and throughout the country and affects the people as a whole. Therefore, to what extent is the ministry playing a role in ensuring that the problem of open burning no longer occurs and affects the country, especially burning done by our neighbouring country. Apart from that, awareness also needs to be fostered by every level of society in caring for and appreciating the existing environment. Every development project implemented should be required of developers to replant trees in the development area. This is to ensure greenery and the environment are preserved in the developed areas. I also want to know from the ministry, how and how much specific funding is given to NGOs or community organisations in efforts to enhance programmes to raise awareness in the field of the environment, and especially to involve awareness campaigns for the public. This is because I see that the involvement of NGOs and community organisations can help the ministry in facing such issues. In addition, I also want to ask that the ministry increase the number of these recycling centres, especially in rural areas, as one of the efforts to raise awareness of recyclable goods and the use of green technology, especially in the industrial sector, to reduce maintenance costs and prevent pollution from occurring. I think that is all, Mr Chairman. Thank you.

Mr ChairmanEN

Thank you. Honourable Members, the House resumes sitting as the House. [The House resumes sitting] [Mr Speaker presided over the sitting]

Mr SpeakerEN

Honourable Members, the sitting is now suspended and will resume at 2.30 p.m. Thank you.

[The sitting was suspended at 1.00 p.m.]

[The sitting resumed at 2.30 p.m.]

Mr SpeakerEN

[The House sits in Committee] [Deputy Speaker (Datuk Seri Dr. Ronald Kiandee) presided over the Committee]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

This one, does he want to debate this? The Honourable Member for Nibong Tebal.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

Assalammualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I would like to thank you for giving me the space to take part in the Committee-stage debate on the Ministry of Natural Resources and Environment. I wish to debate Item 02301 - e-Tanah Project, Mr Chairman. First of all, I would like to congratulate the ministry for taking the initiative and effort to establish this e-Tanah project to modernise land administration by using computerisation to provide the best service to the people in the various transactions of land administration management. I understand through the e-Tanah project portal that the pilot e-Tanah project began in Penang and was launched in 2007. As far as I know, Mr Chairman, this project started as a pilot project carried out by Universiti Sains Malaysia in the late 1970s, in 1979 and the early 1980s, when at that stage all data collection and system building, especially the QRAS or Quit Rent Administrative System, was carried out to provide good service for efforts to collect revenue or land tax. However, the others, such as ALIS or Alienated Land Information System, which covers the application for ownership and the registration of land ownership, subdivision, boundary division and land condition variation, estate management and other branches or land management units, had not yet been completed at that time. However, after 2007 this programme was finally completed, and I understand it was implemented with various sophisticated systems. My question here, Mr Chairman, is: I would like to know, perhaps it took quite a long time from 1979 or the 80s until 2007 to implement, or to complete this project fully. Although I understand that the basic collection data for building this system was already completed nearly a dozen years ago, for building a complete system. Therefore, Mr Chairman, I would like to ask what cost is involved in implementing this project or programme, especially involving system development, computers and all equipment, as well as staff training involved to make this programme a success?

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

Next, Mr Chairman, to what extent can this system help the administration of land matters in aspects such as registration, disposal, strata title, transfer permission, charges and various transactions related to land? Likewise with the application aspect, how can this computer system help, especially for applications for government land or condition variation or estate land management? Will the time taken to approve these applications be shortened, or can it be implemented more effectively? Next, Mr Chairman, after this system is built and successfully implemented across the states of this country, is this system capable of carrying out various analyses of land data, and also supplying data or easy retrieval of data to become input or provide information to customers faster and more easily? For example, if we want to know the pattern of land ownership, for instance, what is the current pattern of land ownership in the Federal Territory? Or the total of abandoned land across the country, for example. That is in terms of making data retrieval easier or conducting analysis on questions raised for planning purposes and the formulation of land policy. Next, Mr Chairman, in connection with this system, perhaps also under Item 020100, which concerns the Inheritance Management and Distribution Services. I hope that if this system has already been built well, the distribution of inheritance cases across the country, especially those involving two or three generations or three or four generations, if land administration can provide facilities to residents, especially for small estates for people in rural areas who have to go through various rather difficult processes to settle these land inheritance cases. This is quite important because when these lands are to be developed or to be taken back by the government, the compensation to be given to them will face major problems and become a difficulty for the common people. So, I hope the ministry, through the modernisation process of land administration, can help residents, especially for small estate cases, so that they can resolve the issue of inheritance distribution. That is all, Mr Chairman. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Jasin.

Thank you, Mr Chairman. I will be brief in discussing Head B.23 and P.23.

I wish to extend my warmest congratulations to the ministry, although it receives a slightly lower allocation next year compared with 2016. However, the allocation obtained for 2017 actually exceeds the allocation made for 2015. So I now move on to Item 060200 – Education and Environmental Assessment. Second, Item 03304 – National Geospatial Data Infrastructure, and then to Item 11800 – National Geohazard Study. Mr Chairman, we can see at this time the effects of the El Nino phenomenon affecting our country. We are actually facing disasters continuously. From the beginning of 2016 until October 2016, we can see a very significant decline in the production of all, the planting or the output of our commodities, especially palm oil and rubber. We can see a very significant decline, cumulatively, of 24.3 per cent for palm oil and likewise for rubber. At this time, for palm oil alone, 500,000 smallholders depend on palm oil for their livelihood. Likewise for rubber, 300,000 smallholders depend on rubber output for their livelihood.

Although at this time the prices of both commodities, thank God, have risen significantly, smallholders are indeed smiling broadly, but at the same time they are facing a very significant decline in yields due to the El Nino that has struck. Once, Mr Chairman, when we faced excessively hot weather, whatever fertilising we did, the uptake by the trees had to stop because there was no water. Likewise, when heavy rain fell in large amounts, the rival or pollination was disrupted. So my question to the ministry is, has the ministry carried out any investigation as to how long this El Nino phenomenon will continue to affect us? I cannot blame the government because this is the cycle of nature, the work of God, because this is a phenomenon we have to face. However, we would like, if possible, to inform the whole community so that not only do we prepare, but we must also adopt good manufacturing or planting practice (GMP – good manufacturing or planting practice). At this time, many of our planting schedules have actually been disrupted. First, replanting and also other plantings. Next, I move on to environmental education and environmental assessment. As we know, environmental education is a process of education about the environment through the environment and also for the environment. This process is for understanding as an interaction between humans and the environment, and how we can manage the problems occurring around us, so that whatever the nation's goal of building a society that is sensitive, possesses accurate knowledge, skills and values, and we truly understand the importance of the environment around us. So I want to ask the ministry, based on the amount of allocation that has been provided, how many social or formal and non-formal education programmes there are, especially since we want to see that our children at school have environmental subjects instilled, so that they can assess or appreciate the blessings of God around us, which are very beautiful at this time, and it is our responsibility to ensure that our environment can be not only managed but also cared for perfectly. Next, I move on...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Kuala Selangor, please stand, Honourable Member.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Kuala Selangor.

Thank you, Mr Chairman, thank you, Honourable Jasin. I strongly agree with the emphasis of Honourable Jasin on awareness of environmental care, including from the exposure of environmental care and its introduction at the early childhood level. Does Honourable Jasin agree that when mentioning the care of the environment, it is not only about enforcement of the law but also the appreciation of the importance of protecting the environment? So in Honourable Jasin's view, in my opinion, as we are moving towards a digital-based economy, of course the matter of protecting the environment cannot be focused only on the government; the private sector and society must always be reminded to protect the environment. Thank you, Mr Chairman.

Thank you to my friend from Kuala Selangor, the digital economy is very, very important. This is indeed the nation's hope for applying knowledge to all levels of society. Anyway, Mr Chairman, I wish to extend my warmest congratulations to the ministry. Both the Minister and the Deputy Minister are examples of leaders who are truly caring, who go to the ground and see for themselves the problems we face.

I recall once there was the problem of flash floods affecting my area. I simply called the Honourable Deputy Minister, and the next day he came down and saw for himself, and thank God, at this time the flood mitigation project in my area has been approved but not yet implemented. However, I ask that it be implemented quickly if possible. Let us show the people, let us prove to the people that our government is truly a responsible government, one that truly wants to see whatever problems faced by the people overcome together. Likewise, the problems occurring with natural disasters. Floods here and there, storms. I observed that both the Minister and the Deputy Minister went down to the ground to show their involvement. Indeed, I saw that day the Minister and Deputy Minister went out to sea to see the project to be implemented in the state of Melaka for a deep-sea port project. Next, I move on to infrastructure and the national geospatial data. Among the objectives of establishing the national geospatial infrastructure is to assist the sharing of information among agencies by providing sophisticated and up-to-date information technology infrastructure so that the dissemination of information is updated and accurate. However, with the suspension of our budget from RM11.5 million, now down to RM6.4 million, will the R&D operations for this data network be affected, as this is one of the most important networks, and how does the ministry view this budget reduction, whether we can strengthen the geospatial database infrastructure. Likewise, this includes what my friend from Kuala Selangor mentioned earlier about the digital economy. Finally, I move on to Item 11800 – National Geohazard Study. Among the causes of geohazards that frequently occur in our country: we have no continuous heavy rain. We also have development on floodplains, followed by geological factors, as well as slope and weather conditions, and also extreme heat. With the increase from RM1.8 million to RM3.2 million for this national geohazard study, how much will we actually spend on studies in the ministry's planning, and I would also ask the ministry to state how it intends to elevate this study to the international level for the country and for other countries that have the same climate and weather as ours. So, my time is running out, and finally, Item 080000 – Irrigation and Drainage. I would like to ask that this department be strengthened at the state level, because every time we apply for allocations, not only for upgrading all rivers and drains, we find that there is a reduction. Thank you. I support.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Bachok.

Thank you, Mr Chairman, and I would like to touch on several items, namely Item 010000 and Item 060000. I would like to refer to the report of Sahabat Alam Malaysia (SAM), which claims that Malaysia appears to be lagging in using the international financial assistance provided by the Green Climate Fund or GCF, with permission. Many other developing countries have already submitted proposals for financial allocations to this GCF.

My question is, what proposals and what allocations have been made by Malaysia as evidence of commitment to the Paris Agreement? Countries such as Vietnam, for example, have had their applications approved by the GCF with USD29.75 million to strengthen the resilience of coastal communities exposed to the impacts of climate change. Why are efforts to address climate change still being postponed by our government in Malaysia, because we have not obtained certainty regarding proposals from the government, whether in the form of readiness grants or project proposals? I also request that the reasons for this delay and the lateness of action be stated, because this is very important, since we have fallen behind countries such as Cambodia, Vietnam and also Laos, whereas due to climate change, the floods of 2014 for example caused very large losses. Millions of ringgit in losses were borne, especially in the agricultural sector. For example, in Kelantan, the estimated loss resulting from these weather changes, the loss was estimated at RM105 million. I request an official estimate of the losses from the government regarding this heatwave, because the people have felt its effects and have had to install air-conditioners, pay more for electricity, and some even have to sleep using many fans in one room. Bathing for longer periods frequently and drinking more. So there also needs to be an explanation from the ministry regarding all the risks and costs that the people have to bear. I also request that the direct and indirect impacts on the people's lives from this heatwave be stated. Furthermore, I would also like to touch on the Special Programme, Item 140100 – Overseas Duty Travel. A sum of RM2,343,600 will be spent in 2017 for overseas duty travel. It should bring worthwhile returns to the people in efforts to address climate change. I request that the specific returns to the people from these overseas duties be stated. Likewise, the Special Programme, Item 140200 – Emoluments for Contract Staff. I would like to ask, why is it necessary to have emoluments expenditure for contract staff of RM946,800 in 2017, when it was not in the estimate for 2016? What specific tasks are so essential that it is necessary to hire contract staff who must be paid emoluments of nearly RM1 million? Would the existing staff not be sufficient to bear the additional workload, if any? That is all I wish to touch on. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Lipis. Before four o'clock, we will stop the debate for this ministry, Honourable Member, yes.

Thank you, Mr Chairman, for allowing me to take part in debating the Supply Bill 2017 under the Ministry of Natural Resources and Environment. I would like to refer to Item 050000, which has been allocated more than RM30 million, namely under Forestry. I mention forestry because the State Government of Pahang still has much forest. On that basis, I wish to mention it so that it can be supervised very well, to be well protected. Earlier I listened to the arguments of Honourable Kuantan, who mentioned several forest areas, and I, too, in the Lipis Parliamentary constituency, certainly want to mention the matter of forestry, because it involves the environment, which can guarantee stability in several respects, particularly ensuring that the forest is well maintained and that water is well supplied.

Now, as Honourable Jasin said earlier, we are facing an El Nino that is very significant in March–April, if I am not mistaken, and it causes the water to become very dry, causing the rivers to become very shallow. Therefore, in the constituency of Lipis, there is involvement, a water crisis has occurred due to this El Nino. So here I mention the matter of forests. We often hear of cases of uncontrolled logging, logging that is sometimes licensed, sometimes done illegally. I once saw, circulated virally on Facebook by certain NGOs, pictures taken from the air showing many areas that have been illegally opened up, and this is one of the causes of the water crisis. Here I wish to mention that between March and May a very significant water crisis occurred, and one of its causes was this logging that I mentioned. That is why I request that the ministry manage this in an orderly manner. I also agree with what Honourable Kuantan, if I am not mistaken, said: do not simply hand the answer over to the state alone; the Federal Government must take the initiative to ensure that areas like this are tightly controlled. I give some examples. We should have an SOP, that is standard of procedure, with permission. We protect these areas. What is that standard? Certainly we have made a bill on forests, but in this matter, we may see many weaknesses. Perhaps due to enforcement, including the forestry office itself, including enforcement from PTG and so on. So this must be strengthened to ensure these things do not happen. I mention this matter: the water crisis occurred because these catchment areas were not controlled either. Although there are many catchment areas in Lipis, because some of these catchment areas are not controlled, the water has dried up. This caused us to be disrupted for months, with water being quite scarce. So I hope that the state government and also, with the cooperation of the Federal Government, can control the forest situation so that we can protect the environment. I make this connection because the Federal Government should think about how to place the proceeds from this logging or mining. I see that many states, especially Pahang, Perak, Selangor and so on, the state revenue depends on forestry resources themselves. Can the Federal Government discuss this matter: these specific areas should be gazetted. These catchment areas should be gazetted, and as compensation, the Federal Government must make payments to the State Government of Pahang or to the state governments that need it. If this does not happen, I believe the situation of forest control will not be properly addressed. So I ask that if enforcement is lacking, we add to it. If equipment is lacking, we add to it. If machinery is lacking, we add to it. Do not simply place this matter on the shoulders of inadequacy for us to carry out our duties. If control is necessary by helicopter, then we control by helicopter, because we want to control this environment well.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Sekijang, please stand, Honourable Member.

Tuan Anuar bin Abd. ManapUMNO · BNSekijangEN

Thank you, Mr Chairman, thank you to Honourable Lipis for giving way. Just a little. I would like to seek the views of Honourable Lipis regarding this enforcement. Apart from the relevant officers who have the authority to carry out this enforcement, do you agree, Honourable Lipis, if we also involve the NGOs that exist, especially those we know care for the environment? They may be involved to assist if there is any forest encroachment and so on; they can pass information directly to the government through our enforcement officers. What is Honourable Lipis's view?

Thank you, Honourable Lipis. I strongly agree, and I include the speech of Honourable Sekijang in my speech text, because I say this in that way since we see, from the whole, I praise the attitude of the NGOs who do this. They have carried out at least as a form of accountability to the government itself, one of the NGOs led by Professor Maketab himself, and one led by Puan Sri Sharifah Naina, if I am not mistaken, if I have the name wrong, then I am wrong. Meaning they have carried out, these NGOs have carried out, a look at how to protect the environment. I strongly agree.

Puan Sri Sabrina, Honourable Lipis.

Puan Sri Sharifah Sabrina, yes, thank you, Honourable Kuantan, for correcting it, because I thought it was only Tanah Aina...

[Dewan ketawa]

That is indeed its name, Tanah Aina, correct, Honourable Kuantan?

[Mengangguk]

Honourable Kuantan nodded to indicate that it is correct. So I strongly agree. That is why sometimes we have to look at this matter, look at these NGOs, we must actually help these NGOs so that we can control the environment. I make this connection because we actually have problems. Landslides and so on, illegal opening of land, illegal mines and so on. I also want to touch on the protection of forests since yesterday we debated very intensely on the ECRL, that is, the East Coast Rail Link, which we debated very intensely. I see that its involvement is about hundreds of kilometres, 660 kilometres if I am not mistaken. It will certainly create a scramble, perhaps a scramble for timber itself, because these routes involve areas that, if I heard from yesterday's speech that I did not have time for, I stood up four times yesterday and could not speak.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Does it pass through Lipis, Honourable Member?

It does not pass through Lipis, Honourable Member.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

It does not pass through, oh.

However, I cannot relate it to the environment, because the ECRL is not included in the route details. I only relate it to environmental protection, because it involves cutting, slopes and so on, involving logging, and possibly several other things on the face of the earth. That will also be taken up by certain parties, perhaps robustly, perhaps cowboy-style, perhaps in a disorderly way, in ways that can damage the environment itself. So this needs attention. I hope the Ministry of Natural Resources and Environment will pay attention to this ECRL project so that it does not affect us in the state of Pahang. We certainly want development, we very much agree, and it does not matter if the government spends several billion. We want the East Coast to develop, as it has been left behind for a long time. But in this matter, let us not do things that leave such matters behind. If possible, these alignments should invite Members of Parliament so that we can at least give our views. If we cannot give views on the alignment, we can give views on the protection of the environment itself. The TV has shown red. Thank you to the Honourable Mr Chairman. I beg to support.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, thank you, Honourable Member. The Honourable Member for Bukit Gantang.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Assalamualaikum warahmatullahi wabarakatuh. Good afternoon, thank you to the Honourable Mr Chairman. I wish to debate Item 060000 – Environment. Humans are increasing, while land is becoming smaller. So certainly the sea becomes the target for reclamation. Therefore, when such things happen, we see the impact of land reclamation to create land for human habitation, which ultimately: (i) we can see the impact on species habitats and ecosystem processes will be disrupted; (ii) the negative impact on the growth of marine resources, especially fish; (iii) the impact on the socio-economy of the people, especially on fishermen's catches; (iv) the impact on fish supply when their fishing grounds are disturbed; (v) the impact on hydraulic changes, namely changes in water currents, which become faster; (vi) the impact of hydrodynamics, namely changes when waves at the coastline and their effects on the coast and shoreline, with faster water flows; and (vii) the negative impact along the coastline, especially erosion and pollution that occur. So here I would like to propose several matters that need attention. First, a proposal to members of the National Physical Planning Council, especially the representatives of the Ministry of Natural Resources and Environment, to re-evaluate the limits of land reclamation and the limits of development in coastal areas as listed in Schedules 1 and 2 of Kualiti Alam Sekitar 2015, so that the participation of local residents and experts can always be included in the decision-making process before coastal reclamation works are approved through an environmental impact assessment. Second, a proposal to members of the National Physical Planning Council, especially to the representatives of the Ministry of Natural Resources and Environment, to establish additional conditions, with stricter approval for sea reclamation for the formation of man-made islands based on international standards. For example, the location of man-made islands formed from sea reclamation may not be carried out within a certain distance, especially in locations close to residential areas, fishing villages, public beaches, economic centres and tourism. The third proposal is to make mandatory the use of zero-pollution technology or methods in every sea reclamation activity. For example, the use of TSHD or trailing suction hopper dredgers, including the use of containment booms and silt curtains to prevent silt from flowing into the open sea. Fourth, that the National Physical Planning Council should gazette more sensitive areas, protection areas and environmental conservation areas so that the losses that have occurred so far can be returned to our children to inherit. Fifth, to make sustainable development mandatory along the coastline. I ask the government to tighten the approval process further and increase enforcement activities for all coastal reclamation activities.

Honourable Mr Chairman.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

As an example, coastal reclamation activities that may affect mangrove forests.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kuala Selangor, please stand, Honourable Member.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Just a small interruption, please.

[Laughter] Thank you, Mr Chairman, and thank you, Honourable Member for Bukit Gantang. I was very interested when the Honourable Member for Bukit Gantang raised this matter, especially in the context of protecting livelihoods and also fishermen. I would like to ask the Honourable Member for Bukit Gantang, who is very knowledgeable in religion. What is the Honourable Member for Bukit Gantang's view from the perspective of religious law, for example when the Penang State Government now wants to continue carrying out sea reclamation in particular, wanting to create islands in fishing areas, including, I understand, in Batu Maung and also in Balik Pulau. I would like to ask for the Honourable Member for Bukit Gantang's view on this. Thank you.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Thank you, Mr Chairman.

Tuan Sim Tong HimDAP · PRKota MelakaEN

This includes Johor and Melaka too.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Yes, that is why the law does not recognise whether a state is governed by the opposition or the government; it must be applied equally. Thank you. Seventh, the number of approvals should be reduced or brought to zero, including increasing redevelopment activities, increasing patrol activities, and heavier penalties for offenders. Eighth, to tighten approvals for sea reclamation activities in the country and also similar activities by the neighbouring country, Singapore in particular, if they are found to be able to affect the socio-economy of the people and the environment in this country. Therefore, a control mechanism needs to be established so as not to allow any land produced from sea reclamation to be made foreign-owned. Mr Chairman, the second issue is Item 050000 – Forestry. The replanting of mangrove forests must be activated in the area around Kuala Sepetang, which has long mangrove forests where there are flora and fauna. It brings good benefits. First, we know it can be a coastal protector against erosion and the threat of tsunami, especially in the northern parts of Kedah, Perlis and Perak. Second, a location for the protection of several species of flora and fauna such as shrimp and fish. Third, an important site for birds to nest, migrate to find food and build nests. Fourth, a proposal to increase the area of mangrove forest by five per cent every year throughout the country's five-year plan. Item 080000 – Irrigation and Drainage. This past Monday, 14 November. My constituency of Bukit Gantang-Terengganu has not yet flooded, Kelantan has not yet flooded, but my area has already flooded. Thirty families in Kampung Simpang Halt and also 13 families in Kampung Jelapang had to be relocated. When heavy rain causes the Sungai Jebong to overflow because heavy rain from Taiping wants to flow into the sea towards my area, residents in my Parliament suffer. The same is true in Kuala Sepetang. Although recently we did gotong-royong together with local residents to make embankments with sandbags, we still see the water overflowing. The efforts we made. However, the water is too high, so the embankments we built could not hold back the water.

Tuan Idris bin Haji AhmadPAS · PNBukit GantangEN

Therefore, we hope that because most of the rivers in my area were built about 30 years ago, when the water capacity was perhaps small, the population was not large, there were not many housing estates, and the population was not dense, we hope that maintenance of these river areas will be activated. Usually when we ask the Drainage and Irrigation Department (JPS), they mention that there is no budget. So I ask that this matter be given attention. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Sibuti.

Thank you, Mr Chairman. I will go straight to Item 15100 – Prevention of Coastal Erosion, and Item 15300 – Dredging of River Mouths. I would like to draw the ministry's attention to the problems occurring in the Sibuti Parliamentary area regarding critical coastal erosion that requires action from the responsible parties concerning erosion occurring in the Muslim cemetery area in Kampung Kuala Bekam, which is nearly reaching the sea. Last month, the people of Bekam complained that land erosion has caused the area near Kuala Bekam to sink and made it difficult for fishing boats to go out to catch fish. Here I would like to state two problems that need attention, namely I ask for an allocation to build a coastal erosion barrier for the cemetery area of about RM100,000. Also, to be able to carry out a small-scale river mouth dredging project so that fishermen in the area can go out to sea and return to catch fish. The budget is not large, namely RM200,000. Besides that, previously Kampung Kuala Sibuti also received a coastal erosion barrier project, but that project still needs to be upgraded and enhanced as the area is a main fishing area. The impact of uncontrolled coastal erosion will cause damage to property, especially houses near the sea and beach, and the place where boats unload fish, which are also very badly affected at present. I support the government's efforts to protect the coast from erosion because I am very worried about the current situation where our beautiful and attractive beaches are also getting smaller. These beaches also have the potential to increase the income of the people through tourism and family recreation. Mr Chairman, Item 16700 – Flood Mitigation and Urban Drainage Plan. Here I would also like to raise the problem of flooding and drainage in the Miri City area, which is close to the Sibuti Parliamentary area, regarding the frequent occurrence of flash floods when heavy rain falls continuously for one hour, two hours. For example, my residential area has a population of nearly 3,000 people in Kampung Luak and the surrounding housing needs a flood mitigation and drainage plan because the existing one needs to be upgraded so that the outflow of water and the flow of drains are not affected when it rains. Likewise in the Piasau Jaya area, which needs drainage system upgrading since the existing drainage was built around the 1980s and is increasingly dilapidated. Mr Chairman, Item 15000 – Minor Works by JPS, Various States. One of the primary schools in the Bekenu area, namely SK Kampung Hangus, frequently floods regardless of heavy rain or high tide, where water in the area will flood because of drainage. The area is close to the main coastal road. I ask that the ministry, through the Drainage and Irrigation Department, come down and provide some allocation to overcome this problem.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Lipis, please stand. Honourable Member.

Okay. Thank you.

Thank you, Mr Chairman, and thank you to the Honourable Member for Sibuti. Actually, I was earlier in the middle of a point but did not have time to mention it. I really agree that the Drainage and Irrigation Department should study the entire area, not just Sibuti. In my area, sometimes these flash floods are caused by rivers and drains that have not been cleaned for many years. So, does the Honourable Member for Sibuti agree that a specific plan should be made by the Drainage and Irrigation Department so that every Parliament has a good drainage system that can reduce flooding? Finally, Mr Chairman, I would like to welcome the teachers and the District Education Office (PPD) from the Lipis Parliamentary area... [Applause]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Your constituents, Honourable Member.

There's a catch, there's a catch here.

Yes, Mr Chairman, I am adding the speech of the Honourable Member for Lipis to my speech.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Does the welcoming part go in too, Honourable Member?

Yes, welcoming. I really agree that the Drainage and Irrigation Department is there to assist the entire areas of Members of Parliament. Please provide sufficient allocation for this department. Likewise, I would like to bring up a problem from the Tuai Rumah Panjang in my area, namely Rumah Langgi, which may collapse at any time because the erosion of his house is getting worse even though several steps have been taken. I hope the ministry will take care of this matter. I request that minor drainage works be carried out for the Kampung 'Lajoie' area, and that repairs and upgrading of drainage be done for the Pekan Batu Niah area, which is developing rapidly and is feared to experience flash floods because the existing drainage can no longer cope with development that has grown two or three times over and is also expected to be hit by floods. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Parit Buntar.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Thank you, Mr Chairman. I have several matters that I would like to raise with the Ministry of Natural Resources and Environment. Three matters, namely first, on forest management involving mangrove forests, second on climate change, and third, if there is time, on the level of river quality in Malaysia. Mr Chairman, regarding forest management involving mangrove forests, 35 per cent of the world's mangrove forests are disappearing today. A total of 50 per cent of that comes from the Philippines, India and also Vietnam, as well as South America. The extinction of mangrove forests is happening faster than the extinction of tropical forests. This figure is very worrying, as my colleagues have already expressed regarding the benefits of mangrove forests, which are very much needed today. Among the main causes is aquaculture activity. This seems to be a trend today based on the government's policy to increase aquaculture. It largely involves mangrove forest areas or api-api forests. I would like to ask, to what extent does the ministry work with this aquaculture policy in the Ministry of Agriculture, so that in balancing the needs of that policy, it does not lead to the encroachment of mangrove forests, which I myself in the Parit Buntar Parliamentary area, especially in the Bagan Tiang area, am experiencing the same problem.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Because the clearing of mangrove forests for areas that have been prepared for prawn farming and so on, they have encroached deep into the mangrove forest areas. From a long-term perspective, this could cause problems. There is no buffer zone if a tsunami occurs, as well as the effects on the ecological life within the ecological system there. So, I hope the Honourable Minister can give an answer so that aquaculture policy and the policy to conserve these mangrove forests can be synergised, so that we do not take any risks in making these two policies. It also involves state government policy, actually, because we know that on this land the Federal Government has no power. The states have the power. To what extent can the Federal Government control the states so that they do not encroach on our need to conserve these mangrove forests? My question is, what are the ministry's targets, specifically government policy, to ensure how much mangrove forest we need to have and how to protect and conserve the mangrove forests along the coastline from being continually wiped out? What makes the situation worse, Mr Chairman, is what we today call climate change, or weather change. Earlier, mention was made of weather change, which has involved global warming, sometimes called global heating. I would like to ask, in the management of environmental resources, the rise in global warming involves a rise in sea levels, and this worsens the situation. In some places mangrove forests are submerged because of this rise in sea levels. What is the government doing to follow these developments so that some measures are taken to tackle this issue? This includes fisheries policy, so that the Honourable Minister of Natural Resources and Environment should not just talk about protecting mangrove forests. But the Ministry of Agriculture and Fisheries says we want to expand aquaculture. In the end, these two policies cannot be combined to achieve a win-win situation. I also want to know, in the budget we have today, which has been cut a great deal, is the government also, because of the lack of budget, placing the problem of mangrove forests as the last priority in determining allocations and policies? I now turn to Item 010300 – Environmental Management, and Item 010200 – Natural Resources Management concerning climate change policy. I want to ask the ministry, there are two approaches today. The afterthought approach. Afterthought means that when something happens, we think about how to solve the effects of climate change. That is one way of thinking. One way of thinking is careful planning. That means, in the planning that is carried out, there is already an estimate of the effects on climate change. Climate change is a reality. It is not something we regard as, "Oh, it's not important. It hasn't happened to our country yet." I feel we cannot have that mindset, because in the past they tried to avoid climate change. But today the approach to facing this problem is that they accept climate change as a reality. Therefore, my question is, to what extent has the government's planning been done in a planned way, not as an afterthought, after something has happened in relation to climate change? This takes into account what the government's estimates are regarding the climate change that forms the basis of planning. What are they? Water resource planning, coastal planning, swamp planning, wildlife planning and fisheries planning. My question is, what instructions have been issued to the states so that policy to tackle climate change or weather change can truly be implemented in the planning, by looking at the implications for the matters that I have mentioned earlier? If not, I fear we will be facing climate change as an afterthought. We will be the ones left behind in the current developments of climate change policy.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

The Honourable Member for Parit Buntar.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kuala Krai, please stand up, Honourable Member.

Dato' Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

I only have two minutes left.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Only half a minute.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

I won't allow that.

Dato' Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Never mind, let my friend give way.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Ya, sila.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

I just want to ask the Honourable Member for Parit Buntar a little. Thank you, Mr Chairman. With the change in the United States and its policy that seems to reject some efforts such as the Paris Agreement, what preparations would be needed for Malaysia before it affects us? This is because every new policy will be tied to our trade policy and our foreign policy with the United States. Thank you.

Dato' Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

That one you must ask Donald Trump [Laughter] because he said he wants to cancel the Paris Agreement. I have no capacity to answer that. Nevertheless, I think Donald Trump will have to face the hard reality of all the campaigns he wants to carry out. This includes our issues. Thank you, Honourable Member for Kuala Krai. I want to ask how, apart from the issue of climate change, the balance of climate change can also be achieved by conserving forests. Here in Malaysia, according to the report from 2000 to 2012, our country lost 14.4 per cent of its forest, covering 47,278 square kilometres. An area larger than Denmark. So, this is something we must take seriously. I want to ask the ministry, how far is the target of 50 per cent? There is a target we agreed at the Rio de Janeiro agreement in 1992, that 50 per cent of forest areas must be conserved. How far have we achieved that target? Finally, my question concerns the Coral Triangle Initiative, which involves several countries in this region, to conserve the sea and also the effects of coral reefs being increasingly wiped out. So I hope the ministry can give a sound view and not give this answer, "we leave it to this ministry", no. This is what I want, the climate change policy that must be included in planning the natural resources we have in our country. That is all, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Sabak Bernam.

Thank you to Mr Chairman. I want to touch on several items, and I will summarise and combine them because several arguments have been presented by some of our colleagues earlier. First, Item 050300 – Forestry; second, Item 0700100 – Wildlife; and third, Item 0800010 – Irrigation and Drainage. I want to touch on Item 050300 concerning forest development. I want to raise the issue of the oil palm plantation project in Sungai Tengah Utara, namely in the Tebuk Mendeling area, which is being developed by a state government-owned company of Selangor. The Honourable Member for Gombak is also here, perhaps you can listen to the problem I am conveying.

This project involves the felling of mangrove forest trees over an area of approximately 200 acres. As a result of the felling of trees and mangrove trees, severe erosion has occurred, where at the Bernam River a riverbank collapse took place in the area concerned, which is described as the worst in the history of my time in the Sabak Bernam Parliament. This is because at this time residents in the area have been displaced as a result of the high tide just now, and the housing area of the PPRT houses in that area has been flooded. Now it is found that about 70 people from 15 houses have been submerged. Mr Chairman, I say this because it has happened repeatedly. In these few months it has happened six times, and three times residents in the area have been displaced. This project, at its initial stage within three or four years ago, we proposed to the State Government not to do it, because we know that in that area we understand that the 200-acre area is an embankment, riverbank or reserve area where many wild animals, including monkeys, pigs and other animals, as well as birds, are found. Mr Chairman, this project has been located in the Sungai Air Tawar riverbank area and in the Tebuk Mendeling area for the past year. As a result of the surrounding area experiencing flooding, including the PPRT Kampung Sungai Tengah Utara, it has not only caused flooding in the surrounding area but also affected habitats such as monkeys and pigs, and even bears have entered the village area. As a result, now in the Sabak Bernam Parliamentary constituency, thousands of monkeys and pigs are attacking the village areas. So it has not only caused flooding, and this is what affects the source of income, because the coconut areas, plantation areas, as a result of these two animals, including monkeys and pigs, have caused losses among farmers, which has also caused a decline in income. The State Government's actions, which continue to be firm, the Honourable Member for Gombak has already left, I wanted to ask earlier.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

He cannot answer, Honourable Member. He will not answer in Parliament, Honourable Member.

Yes, so that he hears the problem. This is not a political problem whether opposition or government party, because I thank the State Government whose exco came yesterday. He came and we from BN also came to help, but the problem is the cause I mentioned earlier. The State Government's actions also continue to be firm in carrying on this oil palm plantation project, which supposedly will provide employment opportunities for local residents. However, it is very disappointing because in reality the jobs are going to foreign workers. At the initial stage, this 200-acre forest area should have been given to the people in the Sungai Tengah area, in the Sabak Bernam Parliamentary constituency, or to the people of the state of Selangor, but its status was changed and it was privatised to the PKPS Negeri Selangor company, of which many of the workers are Indonesians. So the people in the surrounding area of Sabak Bernam can only watch. Mr Chairman, I want to obtain an explanation from the government, especially the Ministry of Natural Resources and Environment, on what action will be taken against the Selangor State Government which has carried out the felling of forest and mangrove trees without taking into account the environmental effects. So I would ask the lawyers sitting over there, especially the Honourable Member for Kapar and others who are in the Selangor State Government, to help the people of Selangor who are facing hardship as a result of the felling of mangrove trees, and before long the floods and the animals that came out just now. Can we sue the Selangor State Government? Meanwhile, is the Selangor State Government ready to provide compensation to the farmers whose incomes have been affected as a result of the clearing of the mangrove forest, and I see that these farmers' incomes have been affected by nearly 80 per cent.

This is because the coconut trees, banana trees and various other trees in the Sabak Bernam Parliamentary constituency are now being attacked by many monkeys, and we have tried very hard. I myself, as a Member of Parliament, have bought many cages and also equipment to eliminate them, including shooting pigs, but they still keep coming.

So I hope, including from the Federal Government and the state government, that we will work together to solve this problem.

[Bangun]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Mersing, please stand, Honourable Member.

Datuk Dr. Abd. Latiff AhmadUMNO · BNMersingEN

The Honourable Member for Sabak Bernam.

Datuk Dr. Abd. Latiff AhmadUMNO · BNMersingEN

Thank you, Mr Chairman. Mersing also has problems, these two problems, people are strong with monkeys. Mersing has a lot of forest, many forest reserves. Thank you to the Department of Wildlife and National Parks (PERHILITAN) for focusing on this. I think the work of the Department of Wildlife and National Parks (PERHILITAN) is only halfway done. The Honourable Member has bought cages, I have also bought cages, but they still remain numerous. I wonder, how can this be solved?

This is the problem I mentioned earlier. In the past, the elders of Sabak Bernam already gave advice to this state government. Do not fell forest trees, do not carry out development projects involving oil palm plantations. We even went down in large numbers, but they were stubborn and went ahead anyway. As a result, the people in the Sabak Bernam Parliamentary constituency are facing the problem I mentioned earlier. I hope that the Federal Government and also the state government can resolve this matter quickly. This is because I see the problems faced by the people there, especially the communities who are very poor. If this matter can be resolved, God willing, I think the plantations in the Sabak Bernam Parliamentary constituency, which consist of the coconut trees mentioned earlier, as well as the oil palm estates and so on, can be overcome. Mr Chairman, I want to convey several points, especially about these mangroves. In the short time I have, I want to mention why mangrove wood is important. Firstly, mangroves affect the movement of air, or strong winds that blow from the direction of the sea.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Time is up, Honourable Member.

So mangroves block the movement of these winds. The mangroves are all gone, so I will take my leave, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kapar.

Thank you, Mr Chairman. I begin with Item 060200, and I want to link this item with sea reclamation, also known as coastal reclamation, which is an activity involving the encroachment of part of the sea area with fill materials such as stone, sand and soil to obtain new land area, the basic land... land. My question is, how many projects are being carried out throughout Malaysia that involve this sea reclamation throughout Malaysia?

Secondly, do these projects involve cooperation with the government, or are they carried out by the private sector? If they are carried out by the private sector, will they be classified as private ownership? Thirdly, what is the government's rationale for granting permission for land reclamation to be carried out across the whole of Malaysia? I, in principle, Honourable Minister, am not fond of this kind of situation, even though it is always rationalised as a development. However, I'm going to go to basic, I feel that is a space for God, so I feel we are defying the power of God, and I do not agree with any land reclamation. So I demand a careful explanation from the Honourable Minister shortly. Returning to Item 060300 concerning mangrove trees. Many have touched on mangrove trees. I only want to touch on a few problems that exist. Earlier my fellow party member over there did not have time to finish. However, I want to pick out the problem faced by mangrove trees, which are commercialised. I am not interested only in Selangor, Honourable Minister. I want the law to be enforced across the whole of Malaysia. The felling of mangrove trees should not only be reduced, if possible abolished altogether, we need them. In several previous discussions in this honourable House, when I faced the Honourable Minister, I said that the felling of mangrove trees would expose us to the risk of tsunami and various other issues that could result in things such as flooding and so on. I repeat once more that mangrove trees are the single greatest force that can prevent tsunami, there is no other force. So, I repeat once again, I am of the view that a law needs to be updated so that even this commercialisation is examined and refined by the ministry. Secondly, the illegal cutting of mangrove trees along the coastline. What then is the ministry's control to manage this situation? I understand that when I conducted a survey and investigation in the coastal areas, I was informed that these mangrove trees are sent to Indonesia because this wood is indeed strong and can be used to build houses and so on, it is very strong. So if indeed illegal logging or cutting activities are being carried out on these mangrove trees, I want to know to what extent this is happening? Does the government have any statistics to prove that the illegal cutting of this mangrove wood really exists? I need an explanation. Thirdly, Honourable Minister, regarding these mangrove trees, as usual, in several ministries recently I have made several proposals. Some proposals were accepted by this ministry, including my proposal. But before that, we face the problem of muddy land where there are changes in tides, high tide water, tidal areas. This area is not suitable for the growth of mangrove seedlings, but this area needs mangrove trees, that is the implication. So, from several studies I have carried out, to overcome the problem in these tidal areas, a unique seed germination method known as viviparity needs to be used. I understand the Federal Government and the ministry have indeed done this before, I was informed. However, I need an explanation from the Honourable Minister on whether this method is indeed being used, and how far this method is having an effect, especially in areas experiencing tidal water and so on. I think my fellow member earlier from the Honourable Member for Sabak Bernam, his area is also tidal, my area is also tidal. So if this method is adopted, I think several areas can be saved. The Honourable Minister said the other day that growing these mangrove trees and so on takes several years. This is a unique natural method that needs to be studied, but the involvement of the ministry must exist and the ministry's role must be there for this method to be adopted. So I need an explanation for all three parts mentioned earlier.

Lastly, Honourable Minister, regarding Item 140300. This concerns the International Conservation Programme for the Giant Panda. Honourable Minister, on 27 January 2016 a delegation from China known as the State Forestry Administration or SFA visited Malaysia.

They came to hold discussions with the Government of Malaysia regarding the review of the International Giant Panda Conservation Cooperation Agreement. So, this means the initial agreement has room to be reviewed again. So I need an explanation from the Honourable Minister on what review has been carried out? What discussions have taken place? Has this review been accepted and sealed, and at the same time, I see almost... Before I continue, yes, Honourable Member.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Honourable Member for Kapar, I want to refer to the earlier remark by the Honourable Member for Sabak Bernam that the state government had approved 200 acres of mangrove land for oil palm planting. I think after I checked with the Exco, there is no situation where the state of Selangor has approved the planting of oil palm. I think the Honourable Member for Sabak Bernam must give a clear explanation on this matter. Otherwise I think the Minister also cannot answer this question.

Yes, thank you, Honourable Member. I think the Honourable Member for Sabak Bernam can interject later and explain his stand. For me, Mr Chairman, please do not play politics with these mangrove trees. Selangor, Penang, Kelantan, Terengganu, if we are hit by a tsunami, Malaysia is destroyed. That's it. So don't play politics with this. I am very committed. Therefore I ask the Honourable Minister to bring a law. Abolish it across the whole of Malaysia. I don't care, I don't mind. Commercialise mangrove trees, at the expense of our country, no way. That's what I mean. I will continue on the pandas just now. I'd forget and it would be difficult later. Pandas, Honourable Minister, we bring pandas, we have commercialised the panda industry since 2014. Its operation, the profit for our country apart from diplomatic relations with the country of China. Time is up, thank you Mr Chairman and thank you Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Tanjong Manis. Then the Honourable Minister may reply.

Datuk Hajah Norah Abd. RahmanPBB · BNTanjong ManisEN

Thank you, Mr Chairman. Peace be upon you and the mercy and blessings of God. Tanjong Manis is a very challenging area, a delta region where Tanjong Manis very much needs cooperation with the Ministry of Environment to make a major plan, especially for the people who are outside, in the interior areas. The embankments that have been damaged for so long in the area, especially at Pulau Bruit where there are 11 villages and 11,000 residents living there, where now an extraordinarily unusual phenomenon of very high tides has been experienced and has damaged the embankments and the parameter embankment in the paddy field areas at Paloh, Kedang, Berangan, Stalun, Sebayang in the District of Tanjong Manis and throughout the Pulau Bruit area of the Daro district. Many areas where sea water has entered the paddy fields and damaged existing crops. Under Item 070000, just like my friend the Honourable Member for Sabak Bernam, the issue of wild animals such as wild boars and monkeys has damaged paddy, fruit and vegetable crops. So we are very worried because these animals have reached the houses in the villages and have entered the kitchens and wreaked havoc in the kitchens. We fear for the safety of our children in the villages because they may be very hungry. So they have reached the houses in the villages.

Datuk Hajah Norah Abd. RahmanPBB · BNTanjong ManisEN

Item 060300 – Supervision and Enforcement. Likewise, the felling of mangrove trees, especially in the New Town of Tanjong Manis and also in the Paloh area. A plan from the ministry together with the State Government of Sarawak should be looked at more seriously because, considering this area is a delta area, planning for enforcement against the theft of mangrove wood is very serious and is not being viewed properly because this area is very far from the town. So I very much hope the ministry can look at it as a whole, especially for the Tanjong Manis area. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, please, Honourable Minister.

Datuk Ir. Dr. Haji Hamim bin SamuriUMNO · BNDeputy Minister of Natural Resources and Environment · LedangEN

Peace be upon you and the mercy and blessings of God. Thank you, Mr Chairman. Firstly, Mr Chairman, I would like to express my millions of thanks to all the Honourable Members who have taken part. There are 19 of them in total, excluding three interjections, and if I took five minutes to answer each Honourable Member, perhaps one hour would not be enough. So I will try to answer as many as I can, or those that are important and not repeated, and for the rest, if I am unable due to time constraints, I will answer in writing. So I thank you once again. Firstly, the Honourable Member from Kuala Kangsar. Many matters were raised, but I will try to address the earlier and more general ones, namely the effectiveness of the Environmental Awareness Campaign that has been carried out. I think this is good because many people need to be involved and need to understand environmental awareness, because recently on 28 October, we held the National Environment Day in Kuching, Sarawak, which was the culmination of all the days that we celebrate at the level of the Ministry of Natural Resources and Environment, and the Honourable Minister has emphasised that the celebration day for the Ministry of Natural Resources and Environment is National Environment Day. Previously it was called Environment Week, now it is called National Environment Day because it has a very significant approach in which all Malaysians have been invited to take part in that day so that the impact on the responsibility to accept all policies, including responsibility for the environment, can reach all Malaysians, therefore this is the first time National Environment Day has been held simultaneously across the country. That means it was also held in every state. So that is among the matters I answer generally regarding the Environmental Awareness Campaign. This is the responsibility of all parties and not only this ministry. It also involves other ministries. Therefore, I think I also appeal for all Honourable Members to be involved so that together we can make the public or their people aware and involved in the Environmental Campaign. A study to assess the level of public awareness of the campaigns carried out. This, in my view, is too subjective. However, from the feedback that we have received from the public, even today, today, it can be said that all, it can be said there are nearly more than 20 Honourable Members who have managed to speak. I saw earlier that all of them were very sensitive and even more understanding of the need to protect the environment, the need to fulfil responsibilities, the need about what we should do in future and so on, about weather changes, extreme climate change at this time due to global warming and so on.

Datuk Ir. Dr. Haji Hamim bin SamuriUMNO · BNDeputy Minister of Natural Resources and Environment · LedangEN

I think that is sufficient to show that in fact, even if there were no campaign, the people are already aware of environmental protection, only the question now is how we can instil awareness and understanding, and the spirit for the people to participate in accepting responsibility or together protecting the environment. So that is the general matter I wanted to mention first, Mr Chairman. The Honourable Member from Kuala Kangsar also asked about managing water resources to reduce the problem of NRW or water shortage. NRE through NAHRIM has carried out further studies on the impact of climate change on the nation's water resources, where this study provides a database of climate change projections that can help KeTTHA in planning to implement mitigation programmes to tackle non-revenue water. Although this does not necessarily relate only to clean water supply, this relates to rainwater that falls on the surface of the Malaysian earth and ultimately is wasted in tackling NRW in the management of treated water supply. [Mr Speaker presides over the Committee] To manage water resources and overcome water shortages, the government has approved the Water Balance Programme or National Water Balance Study or NAWABS, and the government has approved RM50 million in the Eleventh Malaysia Plan. Regarding the database, the Honourable Member from Kuala Kangsar also asked about a complete mineral database. If there is none, also whether Malaysia has sufficient experts for sustainable mineral development. The Ministry of NRE through the Minerals and Geoscience Department has developed a mineral and geoscience data centre and information system under the Ninth Malaysia Plan as a data bank centre to collect, store and disseminate data and information related to the nation's minerals and geosciences. MINGEOSIS is an abbreviation for "mineral geoscience" information, also called MINGEOSIS. It consists of eight databases and four GIS applications related to GMG activities including minerals. The mineral data serves as a guide and reference for GMG in making comprehensive plans towards sustainable national mineral management. At present Malaysia has expertise in the field of mining engineering to ensure mineral development is carried out sustainably. However, the expertise available in Malaysia needs to be enhanced in line with the progress of mining technology and the processing of mineral products. In this regard, various efforts are being carried out, including strategic collaboration between NRE, universities and skills training institutions in Malaysia. Mr Chairman, the Honourable Member for Bandar Kuching asked about- just now the Honourable Member for Bandar Kuching asked the Honourable Minister to answer himself, right. Okay, based on sub-article 77(1), the Federal Constitution empowers the Central Government or the Federal Government to make laws as provided for each matter in the Ninth Schedule, Federal List under item 8(j), the power to export and import minerals and mineral ores falls under the jurisdiction of the Federation. In this matter it is clear that the power to manage matters relating to the export of minerals and mineral ores is under the Federation. This applies in all states, not only in the state of Sarawak. For the information of the Honourable Member, the power to process, approve and issue export permits or EP for minerals and rock materials is based on the Second Schedule under the Customs (Prohibition of Export) (Amendment) (No.2) Order 2007, Customs Act 1967. That power was transferred from the Ministry of International Trade and Industry (MITI) to NRE with effect from 21 December 2007.

Tuan Chong Chieng JenDAP · PHBandar Kuching

[Bangun]

There is no explanation.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

Thank you, Honourable Deputy Minister. What I mentioned is for the export of clay and also stone from Sarawak. Up until last year, these exporters only needed to obtain a permit from the Land and Survey Department of the state of Sarawak. So after having a permit from the Land and Survey Department, they could export clay, stone and other minerals. However, it is only starting this year that the Federal Government through the Minerals and Geoscience Department has implemented a new policy whereby all mineral exports must first obtain a permit from the Minerals and Geoscience Department and also a fee will be charged on these exported materials. My question is why there is such a policy change where the Federal Government wants to interfere in the management of minerals and natural resources in the state of Sarawak. In the Constitution too, management of minerals in Sarawak is under state jurisdiction. This includes sales and exports too. What is the reason for a change in policy?

Mr Chairman, for this early stage, I may be able to answer like this, the exact answer will await from the back. However, at this early stage I may say this, the possibility is the need at the international level, particularly in verifying that a mineral that is exported is really the mineral referred to in the declaration. Meanwhile, the Minerals and Geoscience Department is only at the Central level. I understand it is not in Sarawak but the more precise answer may await from the back. For what is not there, I will postpone first, where the Honourable Member is not there in this. I am not saying the Honourable Member is not there, I am just postponing it first, perhaps at a later time. The answer for the Honourable Member for Bandar Kuching, from now on do not ask again, we can discuss later. From the answer I have received, there is no new policy. Indeed the Federal Government manages the export of minerals. However, we will discuss later.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

Honourable Deputy Minister. This is an important matter, this is a matter concerning state powers and Federal powers.

We will discuss it later.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

We cannot discuss it outside. This must be discussed here.

I do not want to confuse the House but to control...

Tuan Chong Chieng JenDAP · PHBandar Kuching

Yang Berhormat Timbalan Menteri unsure of the answer, is it?

I have received an answer, I will give it later.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

Because, according to what was done previously, there was no intervention by the Department of Mineral and Geoscience (JMG) in the export of minerals, especially the export of clay, ball clay and therefore stone. Why is there now? Is it because the Federal Government no longer has money, wants to collect more taxes? Is this it?... [Interjection] This is not a malicious assumption. Can you give an answer?

Never mind, we take note. I did not take any notes on the accusations just now because the Honourable Member for Bandar Kuching always says that. Thank you.

Tuan Chong Chieng JenDAP · PHBandar KuchingEN

No. This matter is important.

Never mind, okay. The Honourable Member for Kota Samarahan asked about the structure of the seawall. For information, an allocation of RM1 million was approved under P.23, Item 15100, which is a coastal erosion project in various states. The tender advertisement was issued on 30 November 2016. Regarding the phenomenon of big high tides and so on, I think this is a global issue and a single-country issue. However, in the Samarahan Division, a plan to rehabilitate the corridor of the Batang Sadong River in Pekan Simunjan, Batang Sadong River Basin, Samarahan Division, amounting to RM15.5 million under the Eleventh Malaysia Plan (RMK-11), was approved. Likewise regarding the RTB Kuching. Both of you asked earlier. The RTB Kuching has been approved with a total cost of RM150 million to overcome flooding in Bandar Kuching, Integrated River Basin Development (PLSB) Sungai Sarawak - in 2016, RM1.2 million. In 2017, RM5 million. The contractor has already been appointed - this is a design and build contractor, yes. The design work is expected to begin early next year.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Honourable Minister, may I ask?

Puan Rubiah binti Haji WangPBB · GPSKota SamarahanEN

The Honourable Deputy Minister.

Tuan Julian Tan Kok PingDAP · PRStampinEN

From Stampin, Sarawak. Thank you, Honourable Member. I am interested in the answer the Honourable Deputy Minister gave earlier regarding flood mitigation in the Kuching area. I want to ask the Honourable Deputy Minister, what is the current status of that project the Honourable Deputy Minister mentioned just now? Thank you. The status of completion.

The status is the process of appointing the contractor. The design will begin early next year. That means it will only begin next year. That is the status at the Department of Irrigation and Drainage (JPS) level. That means it has not started. It starts this year; early next year the design will begin, and this is the appointment of a contractor on a design and build basis.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Does that mean it will only begin next year?

Tuan Julian Tan Kok PingDAP · PRStampin

Bulan berapa? Because tahun depan can be April, May...

April 2017.

Tuan Julian Tan Kok PingDAP · PRStampinEN

April 2017. Once it begins, when is completion expected?

Tuan Julian Tan Kok PingDAP · PRStampinEN

Because RM150 million is a lot. When is completion expected? Thank you, Honourable Member.

This is progressively; I cannot estimate when it will be completed as it depends on the design and so on...

Tuan Julian Tan Kok PingDAP · PRStampinEN

May I request a detailed written answer?

Kita cuba.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Cannot just try, this is important. Floods cannot be treated as a trial.

Tuan Julian Tan Kok PingDAP · PRStampinEN

May I ask for a detailed written answer on when completion is expected...

Tuan Julian Tan Kok PingDAP · PRStampin

Sepanjang tahun.

Okay, thank you. The Honourable Member for Kinabatangan...

Puan Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Honourable Deputy Minister, may I have a little clarification. Regarding the improvement of the urban drainage system just now. I have raised two places, namely the system at SK Jalan Mara Tuang and Taman Uni Garden, which have also been informed, actually to be implemented this year. That is why I want to know the status, whether it is either carried over to next year?

Thank you, Honourable Member for Kota Samarahan. I do not have an answer yet; if I have, I will give it, if not, I will give a written answer. The Honourable Member for Kinabatangan asked about the coastal urban areas that will be submerged. This is related to climate change. For the information of the Honourable Member for Kinabatangan, as I mentioned earlier, NAHRIM is carrying out further studies on the phenomenon of high tides and also the impact of climate change on sea-level rise along the coast. The expected outcome of this study is to provide projected maximum sea-level rise data for several areas, about 22 areas, based on altimeter satellite data. It will also provide risk maps of the impact of sea-level rise for major coastal towns. This data will help agencies, especially JPS and also NADMA, to prepare and implement mitigation plans and also help local authorities (PBT) for development planning. As we are well aware, actually this is related to- it is difficult to make an accurate projection, but the study is being carried out by the ministry, especially JPS including NAHRIM, on the actual impact, especially the projection of sea-level rise due to global warming. As I mentioned before, this extreme climate change not only causes sea levels to rise due to global warming and so on, but also causes the magnitude of waves to change, not only in the size or strength of the waves but also in direction. That is why if we look at some coastlines that are severely eroded, mangrove trees are also eroded...

Dato’ Sri Bung Moktar bin RadenUMNO · BNKinabatangan

[Bangun]

Honourable Member for Kinabatangan, just a moment. Mangrove trees are not only destroyed because they were felled earlier due to past commercial activities, but also because of coastal erosion caused by changes in wave magnitude as a result of global warming and also...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

A brief explanation. Thank you, Mr Chairman. We do not deny that this may be beyond our expectation and control. However, look at how Taiwan, that country already knows that it will always face typhoon winds that hit its cities, its country. So it designed its buildings to be typhoon-resistant. The typhoon hits but the buildings do not collapse. So why do we not look at how they structure their buildings so that they can face typhoons whatever they are, so the cost of damage is very small. So perhaps we can learn from such technology. We already know there are such elements. So what preparations do we have, what readiness do we have to face situations where the magnitude is uncertain, high tides that cannot be predicted. We should have a long-term plan toward early prevention so that undesirable damage does not occur. Thank you.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

The Honourable Deputy Minister.

Just a moment, thank you.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

I want to continue a little from the Honourable Member for Kinabatangan. I support the views of the Honourable Member for Kinabatangan. That is, in my speech earlier, I mentioned careful planning, taking climate change into account. That is what it means. Do not, when it has already happened, then we become busy; after that we do something in the next planning, we do not have that consideration.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

So that is what is meant, which I think is what we asked, that there be that consideration. Do not take action only after it has happened. Thank you, Honourable Member for Kinabatangan.

Thank you, Honourable Member for Kinabatangan and also the Honourable Member for Parit Buntar. Yes, I do not deny it. That is why I said earlier, a detailed study, perhaps Honourable Members find it difficult to accept- the so-called "study", yes. But because the climate change in the world has occurred in a not-so-long period. In the past perhaps people did not mind. Only now are we extremely cautious in facing the issues of global warming and climate change. I said earlier, that is, our side is conducting an accurate study on the projection of the impact of global warming, climate change and so on, so that we can make not only a policy but also accurate preparation, including what in engineering we call increasing the factor of safety, with permission, and so on. That is in the RTB and so on. That is among them. If we talk about river banks and sea walls, now JPS has submitted a proposed plan to raise all the existing banks along the sea and rivers, which requires expenditure of about RM1 billion, that is an example, that is among them. It is not just one matter, there are many.

How do we face what was mentioned earlier, that coral reefs may be damaged, which are a major supplier of oxygen to the world. So, there are many matters that we are conducting detailed studies on to obtain an accurate projection. That is precisely why the Honourable Minister is now overseas, most recently in Marrakesh, so that we can exchange views and experiences together, and there climate experts are gathered, we share experiences, information and so on so that we can also make accurate projections in the future, but not for very long, Mr Chairman. Mr Chairman, to the Honourable Member for Kinabatangan once again, I will answer in writing regarding the pollution by palm oil mills in the Kinabatangan River because the answer is too long. The Honourable Member for Bukit Bintang, also regarding the Ajinomoto odour pollution, I will answer in writing because this is far more specific. Oh! He is not here. Sorry. The Honourable Member for Bukit Bintang is also not here? Never mind, I...

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Me. Me. I am here.

I will answer in writing, you may share it.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

No. Two in one. Me, two constituencies asked one, actually two questions.

Never mind, I will answer in writing later, you may share it.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Like this, there is no need to answer all of them, in writing to everyone.

Can it be like that? Because it is very long. May I? Never mind about...

[Speaking without using the microphone]

Puan Teresa Kok Suh SimDAP · PHSeputeh

Yalah.

About- okay, I will answer just one about...

Puan Teresa Kok Suh SimDAP · PHSeputehEN

...Bukit Nanas Forest. I promised to cut it short.

The Forest at Bukit Nanas is carrying out the upgrading of the Forestry Department Peninsular Malaysia (JPSM) information centre at Bukit Nanas, Kuala Lumpur, into an Interactive Natural History Gallery to enhance educational communication and public awareness, at a cost of approximately RM450,000. Meanwhile, in 2016, JPSM allocated RM300,000 to develop the Kuala Lumpur Bukit Nanas Eco-Forest Park. In 2017, a total of RM1 million has been allocated. For now, visits to the Kuala Lumpur Eco-Forest Park are still maintained from 7 am to 7 pm. The department has taken note of the proposal to extend the visiting hours, taking into account visitor safety factors. No entrance fee is charged to visitors to the Kuala Lumpur Eco-Forest Park at this time. The entrance fee rate raised by the Honourable Member is still at the study stage.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I suggest there should be no charge. Otherwise, even fewer people will want to enter your jungle forest. They will go to the shopping malls.

Noted. Mr Chairman, the Honourable Member asked about monkey conflicts. This is the result of biodiversity instability, as we know. However, what I said here is that up to now I have discussed with the Department of Wildlife and National Parks (PERHILITAN), which is expert on monkeys, monkey populations and so on, there is still no effective solution. Still none. For now, what can be done is to hold integrated operations together with other agencies such as the Malaysian People's Volunteer Corps (RELA) and JKK to reduce the monkey population through a relocation programme.

Datuk Dr. Abd. Latiff AhmadUMNO · BNMersingEN

Honourable Minister. Mr Chairman, does the ministry have a network and conduct studies with any experts at universities to study this matter? If so, Honourable Minister, could you state who they are, those who are experts in monkey matters? I am sure such experts are not in this House.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Honourable Minister, Mr Chairman, allow me to ask. Thank you, Mr Chairman, and the Honourable Minister, regarding these monkeys and macaques. In conversation with my friends, I said there is a technique to trap these monkeys, namely by setting up a cage that is one-way. If the monkey enters it, it cannot get out. Only now, the problem is that it is not in general knowledge, and then with whom do we contact. I think this is not a problem only in Kota Raja, other friends say. Other friends have also raised the same matter. So we need to have a plan. I recall since 2008, when I was here, the monkey problem has been raised again and again. Surely in these six, seven years there has been no planning. It is very sad because the ministry exists.

Thank you, the Honourable Member for Mersing and the Honourable Member for Kota Raja. Actually the issue that...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

This, Mr Chairman. There is indeed another monkey species, namely the proboscis monkey. It is found in Kinabatangan. I see that those who like to conduct this research are from Japan and China. I do not know whether there are any Malaysian teams doing the research. This species is rather unusual, Mr Chairman. Its group is about 40 to 50 animals. Not more. In it, if there are 50, 49 are female, only one male. So, its nose is big but it is unusual. So, if its offspring is born male, he will fight with his father. Whoever loses must step down. Only one lord. Not more. So, perhaps it can be studied. Perhaps there is some medicine behind this group that we may obtain from research. Thank you.

Thank you, Mr Chairman. Thank you, the Honourable Member for Mersing, the Honourable Member for Kota Raja and the Honourable Member for Kinabatangan.

Actually, I want to admit that my constituency also faces the same situation, which is why I dare to say that the ministry, the Department of Wildlife and National Parks (PERHILITAN), does not yet have an effective technique or method. However, PERHILITAN is working together with experts at home and abroad, especially academics, to study the best way. This is because it relates to disturbance of their habitat. The Honourable Member for Kota Raja also raised the problem of floods in towns. I want to say this, I agree with the view of the Honourable Member for Kota Raja just now, namely there must be coordination in facing and solving the flood problem, especially flash floods. If floods occur, next time it is easier for us to predict. Moreover, the effects of climate or climate change are very extreme at this time. That is why, Mr Chairman, and the Honourable Member for Kota Raja and perhaps also other Honourable Members who have raised it. I want to say here that the ministry views this as a very serious matter. JPS already has various regulations, guidelines and so on, which I mentioned here, for example the Malaysia Stormwater Management Manual (MASMA) and many more guidelines that have been issued to the states. Many guidelines have been issued to PBT and so on. However, they have not been effective. Why are they not effective? This is because they are not a law. That means they have not been legislated. Therefore, Mr Chairman, the Ministry of Natural Resources and Environment (KASA) has completed drafting the National Water Resources Bill, which is now being circulated throughout the country. That means we have met all state governments except two, is that right? The ones we have not met are Selangor and Sabah. We are still waiting for a suitable date. This is because we are of the view that if this bill, which is a template that can be adopted throughout the country and whose power lies 100 per cent with the states.

I think it is easy for all guidelines or regulations that have been issued and prepared by JPS, in particular, to be enforced in the states. Because the Water Resources Bill is important to support the implementation of the National Water Resources Policy. Many are also confused about national water resources, but I want to explain here, this is only national water resources. That means from the water that falls from the sky until it reaches the intake weir (muka sauk) or water intake, the water treatment system. From the water intake or intake weir, the water treatment system until it reaches the kitchen of the house or any factory and so on, that is not under this bill. This bill is only related to water resources. We believe that if this bill can be implemented, all coordination relating to the drainage system, relating to the stormwater management manual introduced by JPS and others. Including the National Water Balance Management System mentioned earlier, for the purpose of storing water on the earth's surface and so on, not in the sea, can be managed perfectly. So if the Honourable Member mentioned coordination, actually I think this is the tool, or in colloquial terms, the medicine for all the problems as mentioned by the Honourable Member for Kinabatangan, the Honourable Member for Kota Raja and a few earlier, the Honourable Member for Lipis and many others mentioned this, regarding coordination.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Honourable Minister. I want to ask, if possible, that the draft be given to us earlier. This is because sometimes when it reaches this table, the time is too short because we also need to consult with local government and so on. Sometimes government to government, but we who sit on the ground, the actual thing. The main problem I see is that when the drainage system's jurisdiction is held by three ministries, namely the Ministry of Natural Resources and Environment through its JPS, the Public Works Department (JKR), and also the local authorities (PBT). So each one often quarrels over whose drain this is, whose monsoon drain this is that must bear this. So that is the issue.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

So recently I was told that actually he does not even have a master plan for all the drainage in the area. So this is the matter. The thing is simple, but I really hope the law to be brought in is correct. I think it is not an amendment, Honourable Member. It is a new law, and it must be given sufficient time for us all to study it carefully. Thank you.

Thank you, Honourable Member. There are two matters. First, for this bill, we are conducting engagement, with permission, with many parties. Second, we are also tabling it in all state governments, including Penang and Kelantan. The states that have not yet, only Selangor and also Sabah. That means we are involving everyone. The Honourable Member just now mentioned the need for it to be tabled too, the need also for the Honourable Members to be informed. As this is still at the draft stage, before we finalise it, we will try to get in touch with the Honourable Members, whoever is interested, to obtain more precise feedback. That is all, thank you. Honourable Member, there is something I want to skip because...

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Don't skip much...

Because I am looking left and right. So okay, never mind. Honourable Putatan, actually many matters were raised by Honourable Putatan just now. I noted several matters just now. If I am not mistaken, I had about 15 or 10. If I am not mistaken, yes. 1, 2, 3, 4, 5, 6, close to 20 like this. Because most of the matters raised by Honourable Putatan are too technical [Laughter] more of local problems, I admit to Honourable Putatan that I have not yet fulfilled my promise to Honourable Putatan to visit Putatan. So I will go to Putatan after the Dewan Negara session ends to assist Honourable Putatan. That is all, thank you. Honourable Kota Raja, regarding the matter of the land-conditions conversion just now, I will answer in writing, yes, because it is too technical. Honourable Lenggong, I think I have already answered in general about coordination. Just now Honourable Lenggong was not here, but he did mention a perception that JPS uses old designs, as if there is no new innovation for drainage systems and so on. However, I want to stress here that many new innovations have been produced by JPS engineers despite facing several challenges. For example, among them is river training. I myself did not really understand what river training was before, but actually river training is where we shape, we try to shape the river flow so that it does not quickly accumulate silt or soil sediment at the river mouth that is bent, that is one of them. That is called river training. There are several others, and by coincidence tomorrow is JPS Innovation Day. If you are willing, you may come. Honourable Kota Raja spoke about controlling the preservation of mangrove forests in Langkawi. This is a matter that, in my view, is very serious in Langkawi. The issue is, first, as I said just now, because of strong waves. But in Sungai Kilim it is because of the speed of tourist boats, and this has actually already been reported to- if it concerns tourist boats, we have reported it to the Ministry of Transport to take action. But what is important is that there, awareness of mangrove tree conservation is very high among the fishermen. Because the fishermen there are very concerned, and they once met me, they said they are worried that these mangrove trees will be destroyed by disturbance and so on, especially by tourist boats, because this can affect the food of marine life, especially fish. So their awareness is very high. However, the mangrove planting programme is under way throughout the country. The details have not yet reached my desk. If there are any, I will mention them. Details about the Mangrove Tree Planting Programme throughout the country. God willing, it includes Langkawi.

Dr. Siti Mariah binti MahmudPAS · PRKota RajaEN

Sorry, thank you, Mr Chairman. Honourable Minister, can we not have an act to prevent development in mangrove areas and along these coastlines? That means it is something everyone has mentioned, but we need courage here so that this matter does not depend on the local authority or the state, land rights and so on. If Parliament can pass this, I think the Honourable Minister's headache will not be so bad, God willing, the future will not be so terrible in terms of mangrove control.

Thank you, Honourable Kota Raja. I want to inform here that practically all the acts under the Ministry of Natural Resources and Environmental Sustainability (NRES) are already obsolete. I can say all of them. Those that we have amended, there are several acts, strata title, the act for land in the past, the FRIM Act and so on. Others are in the process of either being amended in full or amended in part, in line with current climate change and also the need for us to protect the environment and natural resources more seriously. That is for the Honourable Member's information.

Honourable Kuantan, we have noted the proposal to convert clearing areas into people's plantations. Regarding illegal logging, it is actually the same as what I mentioned just now, everything falls under the state government. However, we have a Land Council, which also includes the nationwide forest agenda. Almost all state governments have agreed to accept a resolution that there is a certain quota for the felling of forest trees. Therefore, until now forested areas in Malaysia, especially Peninsular Malaysia, I say Peninsular Malaysia first, others I may answer if it is Sabah and Sarawak, they are separate. For example, in Peninsular Malaysia, the total forest area is 5.86 million hectares. What I want to stress here is that the important thing is that we maintain the quota. That means we do not reduce it. Our commitment is that the land of Malaysia remains with 55 per cent, not less than 55 per cent, covered by forest trees. That is the policy, including whether Permanent Forest Reserves, production forests, protection forests, national parks, including land owned by the government. That policy remains. This has already been agreed under the National Land Council, which includes the agenda for addressing forest issues. That is all, thank you.

Thank you, Honourable Deputy Minister. So what was said just now, that we maintain 55 per cent of forest and the quota for forest trees. But the problem arises, Honourable Deputy Minister, when approvals are given one after another and before the trees have had a chance to grow, the parcel next to it has already been approved. So in the end, it becomes one big jigsaw that the trees never had time to grow into. So perhaps that is what I meant, so that we can control it, Honourable Deputy Minister. Another thing I am worried about is when these forest plantations are under the pretext of making forest plantations, but then they are abandoned. After all the timber is taken, then it is abandoned, the forest plantation never materialises. I only obtained this information after I debated just now. Somebody sent me this. List of maps of damaged forest reserves in Pahang, which shows that the damaged forest reserves in Pahang total 90,069 hectares. Damaged forest reserves. Below this includes Temerloh and Bentong. Bentong, yes, 10,776 hectares of damaged forest reserves. Here it is written Kemasul Forest, Kemasul Forest Reserve. What I know is that Kemasul Forest Reserve is in Bentong, and I know that about 6,000 hectares were meant to be people's plantations but have been abandoned for several years. After all the timber was taken, then abandoned, not even planted with forest plantation trees. So this is what I think is a loophole being misused, perhaps by state government parties. But what can we do? As a ministry, what can be seen? Which aspect of the law can we look at? For example, in the bauxite issue, we know that bauxite licences are issued by the state government. However, the exploration licence is issued by the ministry, and it is the ministry that is responsible for the moratorium. Like that.

How do we find a way, to save this in a situation where the state government does not pay any respect at all to the preservation, or deforestation is happening so ruthlessly? Thank you.

Continuing a little, Honourable Member. Briefly only. Thank you, Honourable Member. Just now the Honourable Deputy Minister said 55 per cent covers everything. I want to know, of this 55 per cent, what percentage is Permanent Forest Reserve, out of the 55 percent? Thank you.

Look, Permanent Forest Reserves in Peninsular Malaysia are 4.93 million hectares, which comprise 83.9 per cent of the total forest in Peninsular Malaysia. Yes, whether permanent production forest reserves or permanent protection forest reserves. This does not include national parks for wildlife, for bird sanctuaries, and also does not include government land or privately owned land that has forest in it. Understood? So to answer the Honourable Kuantan just now, it is like this. Any changes that occur, there are reports. Those reports are what we table and discuss, usually in the National Land Council under that forest agenda. That means we are not querying, but so that we can all be alert, so that at least what is done at state government level does not affect the nationwide forest policy, because our purpose is to protect forest biodiversity at national level. That is what I mean. As for the Honourable Kuantan, he also asked about...

Yang Berhormat.

Can the ministry, Mr Chairman, can the Federal Government not make a policy so that it pays compensation to the state government, and not open forests at all. That means forests that we think do not need to be opened, should not be opened. Because, from a legal point of view, I do not see that the Federal Government has the power to restrain a state government from opening them, whereas state governments have their own financial resources. So if a policy is made, that means the Federal Government pays the value. Say 10,000 acres should not be opened, this is its money, give it to the state government. If it is to be opened, let the Federal Government arrange it in terms of the opening. We are also worried that uncontrolled logging could affect rivers, the environment and water catchment areas. Perhaps one day there will be a disaster, a worrying situation. We hope the Federal Government will bring this matter to the National Land Council so as to provide allocation for paying compensation to the state governments. Thank you.

Thank you, Honourable Rompin. Actually, this is one of the matters that the ministry has been considering earlier, including several views from parties including the Honourable Johor Bahru, that a Trust Fund be set up for us. This is one of the proposals for us to have a large fund in which all Malaysians have an interest and can apply for the proposal from Honourable Rompin just now. That means we contrast it with the amount.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit Buntar

[Bangun]

This is an example. Say a state needs RM1 million instead of cutting trees, it may be replaced with an existing trust fund or from an allocation provided at Federal level. This is a possibility we are currently considering. Only it has not yet reached a point where we can conclude it.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Honourable Deputy Minister, Mr Chairman. I think the Honourable Deputy Minister may refer to the Kedah State Government, because in the past there really was a model agreement during the time of the late Tan Sri Azizan Razak.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Before that, the Kedah State Government was supposed to be promised compensation so that it would not cut the area said to be a water catchment area there. But unfortunately, when the late Tan Sri Azizan was Menteri Besar at that time, I myself once brought this issue to the attention of the Honourable Minister and Deputy Minister, the Federal Government did not fulfil its promise to give compensation to the state of Kedah. I once raised this issue during the previous session. So I think it is not right to study which thing already exists, the policy already exists, only as Honourable Rompin proposed, I very much agree there must be compensation if we want to ask that state not to cut trees on the ground of protecting the 52 per cent that the 55 per cent refers to, with permission, yes, there must be some compensation to the state. But if it is said they are only now going to study, I think that is not right, the policy already exists.

Look, what is not provided with compensation by the Federal Government is the issue of opening forest areas for the purpose of income and so on. But all of this, we are actually considering so that we can make a more holistic proposal. After that, I want to mention here that the National Water Resources Bill is very important because it may also include something that may be a bit of a trigger for some states, some states, yes, not all, or some parties, we say, who are still worried about ensuring that water catchment areas are not disturbed. This is among the things we are trying to involve in the National Water Resources Bill. Honourable Kuantan also touched on the sediment pond from Lynas, found to contain heavy metals that have been found to increase from the baseline. Look, Honourable Kuantan, I have two matters. First of all, I say the ministry is responsible overall, we are only the feeder, it is MOSTI under the AELB. I do not intend to answer in detail because I do not want to contradict, with permission, the answer that will be given by MOSTI in writing later. However, I have received an assurance from MOSTI and also from Lynas to invite the Honourable Member and also other colleagues, regardless of where from, to visit the factory together, inside and out. I was informed by Lynas that they can bring along any experts from around the world or any journalists or any reporters into the area or outside areas so that we can survey together, see together how far the differences of opinion can be discussed together and understand together the actual situation. That is my answer and I will not elaborate further.

Honourable Deputy Minister. Thank you, Mr Chairman. Honourable Deputy Minister, MOSTI clearly does not want to and will not answer about the effluent from the sedimentation pond because they say it is under the regulatory control of the Department of Environment. So MOSTI really will not answer. Since last year I have raised the issue of effluent from the sedimentation pond. MOSTI says it is under the Department of Environment. So it means MOSTI will not answer, so it is indeed under enforcement. That is why I am asking the Honourable Deputy Minister again to respond to this matter. I am not unwilling to go to Lynas. We know Lynas's PR exercise. We also know that MOSTI, from before until now, has always talked about radiation, and dozens, hundreds of times if I have voiced it, that it is about radioactive waste management. The Honourable Minister of MOSTI himself said, "There is no PDF so far, recycling is also unclear." Yesterday I asked about Lynas not paying the AELB. The Honourable Minister has already made a decision before I debate again, and will give a written answer. So how, Honourable Deputy Minister? Want to pass it like a ball?

Puan Teresa Kok Suh SimDAP · PHSeputehEN

[Speaking without using the loudspeaker]

So even if we enter Lynas, they will say the same thing, it is safe because the radiation is at this level, this level, this level. They will not answer how the PDF is, they will not answer the recycling issues, they will not answer about the RSF, its lining, it can leach into the ground. They will not answer.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Betul!

That is why we say...

Okay, what is that, okay.

...We are tired, but I have to voice it.

Thank you, too long [Laughter] Okay.

That is why I ask the Honourable Minister to answer this matter, the matter of effluent from the sedimentation pond.

Okay Mr Chairman, I will answer the question on the sediment pond, but I hope there will be no further questions on this. After this, if you are still not satisfied, let us go to the site together. The answer is based on the effluent reporting submitted by Lynas in October 2016, which is very recent. Through the Online Environmental Reporting (OER), all parameters released as treated effluent are fully compliant. Sediment samples found to contain heavy metals that have increased from the baseline may be due to the long-term cumulative effects of other non-specific discharge sources, okay. Under the Environmental Radiation Monitoring Programme (ERMP), which is operated by Lynas as the operator and enforced by AELB, the study related to sediment falls under AELB, including sampling. [Laughter] I hope there are no more questions, yes. If you are still not satisfied, this is the answer I have, okay. If you are still not satisfied, I offer that we go together to the site. No problem, yes. Okay.

I will follow up with the Honourable Deputy Minister. Thank you.

Okay. Only three minutes left, Mr Chairman. [Laughter]

Puan Teresa Kok Suh SimDAP · PHSeputehEN

[Speaking without using the microphone]

Because I promised, I will follow the instruction of Mr Chairman.

The banned pesticides, Honourable Deputy Minister. Banned pesticides, Cameron Highlands.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Ya.

That is not yet. Is it? If I do not answer, I will give a written reply. Perhaps there is more below [Laughter]. Further below, okay. Because I do not want to exceed one hour, as I have promised the House. I want to go to the matter that, look…

Panda belum.

Apa dia?

Panda belum.

Panda? I will answer Panda in writing.

Okay Mr Chairman, I think I will answer the rest in writing because it would not be fair to choose one by one, right?

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Honourable Deputy Minister…

Tidak adil.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Honourable Deputy Minister.

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

The Honourable Member for Sabak Bernam just now…

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

The Honourable Member for Sabak Bernam just now said that the mangrove forest reserve in Selangor was felled. Is there an answer?

I do not yet have an answer, I still do not have an answer. As for the state matter, there was no time to send a drone yet. [Laughter]

Tuan Hee Loy SianPKR · PRPetaling Jaya SelatanEN

Yes, the Honourable Deputy Minister must deny the accusation because the state of Selangor has no plan at all to fell mangrove trees.

Okay, okay, noted. I promise, I will answer in writing. Mr Chairman, that is all I can answer. For the rest, I will answer in writing. I thank all the Honourable Members who have taken part. That is all, thank you. Wassalamualaikum warahmatullahi wabarakatuh.

Mr ChairmanEN

Thank you. I see that the problems that arose were before the questions raised by the Honourable Members during the debate. Even before they were answered, there were Honourable Members, not just some but many Honourable Members, who stood up to raise yet another problem. That is why not all could be answered. Nevertheless, thank you, Honourable Members. Honourable Members, the question is that the sum of RM864,050,600 for Purpose B.23 under the Ministry of Natural Resources and Environment, which forms part of the Schedule, be agreed to. [The question was put and agreed to] [The sum of RM864,050,600 for Purpose B.23 is ordered to form part of the Schedule]

Mr ChairmanEN

The question is that the expenditure of RM1,593,645,000 for Purpose P.23 stated in the Development Estimates for the year 2017 be approved. [The question was put and agreed to] [The sum of RM1,593,645,000 for Purpose P.23 is approved to form part of the 2017 Development Estimates]

Bill — Supply Bill 2017 and Development Estimates Motion 2017 Committee — Clause B.29 [Schedule] - Clause P.29 [Development Estimates 2017] –Bill

Mr ChairmanEN

Supply Head B.29 and Development Head P.29 under the Ministry of Energy, Green Technology and Water are open for debate.

Mr ChairmanEN

I see the Honourable Member for Pokok Sena first, because of his position on the tree... [House laughs] Please, the Honourable Member for Pokok Sena.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Thank you, Mr Chairman, you are kind, even though Mr Chairman is under the tree, but because Mr Chairman always looks up, you will surely see the people sitting on the tree, God willing. Thank you, Mr Chairman. I wish to take part on B.29, which is the Ministry of Energy, Green Technology and Water, touching on Item 010200 – Energy, Green Technology and Special Projects Sabah Electricity Supply. However, what I want to focus on is energy related to the issue that has arisen, causing anxiety and dissatisfaction among 8.5 million electricity users of TNB regarding TNB's new billing system programme, TNB BCRM, or the new bill, which has been implemented by TNB and is seen as causing various problems of perception as well as fear, worry and so on. So I see that this is due to TNB not conducting an extensive and comprehensive campaign or explanation to TNB customers about the change or transition from the old billing system to the new bill. Moreover, the explanation regarding the change of account number from 14 digits to 12 digits has also not been comprehensively informed. Although TNB has explained that it is at the back of the bill, because it was not comprehensively informed, rumours in the electronic media especially, have caused the people not to be aware, and some assume that when they pay through this online system, bank transfers and so on, they are still paying on the old account number. So, some have informed us that when the next bill came, there were still arrears. So these are their worries. So I want to get an explanation, why did TNB, before implementing this new billing system, not conduct proper campaigns to inform the public and the people, especially TNB customers? Then, I also want to get an explanation from TNB about the problem of delayed bills that still exists until now. Until when will this situation be rectified and when will they be able to receive bills within the proper period as determined? This is because to avoid receiving a bill after two or three months, making the bill large. When the bill is large, their ability to pay it, because this money, when people have money in this high cost of living situation, they will spend on what is needed first. When the bill does not arrive, the money will be used to spend on other things. The concern is that when the bill arrives, the payment period causes us to be late. So the worry is that the electricity will be cut off. So I ask for a guarantee from the government that there is a period after this delayed bill is received, that period must be reasonable. It cannot be a period like usual, after which disconnection action will come. Next, Mr Chairman, I also want to get an explanation from the ministry, from the government, about which company won the tender to prepare TNB's new bill? I also want to get a list of successful projects carried out by that company previously. This is very important because, for me, if the company that won this tender is a company that has proven success in projects done before, I think there would be no problem like we have faced over the past few months until now. So I want to ask for the name of that company and what total cost TNB spent to prepare the latest billing system, as well as the benefits that users will obtain from this system? Because I think I am worried that the cost prepared by TNB will be high, but the benefit to users cannot be seen in terms of a cheaper bill, meaning there is profit, rebates and so on.

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Will the government provide rebates for the several problems that arose previously, to show that TNB is so considerate towards consumers? Because of the hardship of consumers, we will give rebates. Because of the hardship from the bill issues that arose, then with this change, TNB will give certain rebates to consumers for the hardships experienced by consumers or TNB customers, who number 8.5 million people. So this is what I want to get from the government, especially from the Minister responsible for TNB. I also hope that the government can look at the issue that consumers of TNB, TNB customers, are hoping for, which is not merely a new system, a new billing and so on, they want the best service and also the cheapest. Meaning the bill borne by them, for the poor and the needy, they are unable to bear it in the current increasing cost of living. So I hope that, meaning TNB should think more about how to reduce the electricity bill costs that must be borne by them, not merely— not that I do not agree, but not just merely to change to a new billing system. So I ask, and I also want to get, who is the project manager for TNB's new billing system, which has placed such great hope on the new system? Some parties are of the view that TNB should have used the old system until the new system was truly stable before the old billing system was totally terminated. So, not yet stable, suddenly we have already used it. Is the new system, which is still not stable, already being used? So this is something that is not appropriate. And has the government or TNB conducted a pilot project first to test the effectiveness of this new billing system? In my view, this is what TNB should have done. So I thank you, Mr Chairman. I seek an explanation from the Honourable Minister.

Mr ChairmanEN

The Honourable Member for Putatan.

Thank you, Mr Chairman. I have only two or three matters, Mr Chairman. One is for Purpose B.29, Item 050200 – Malaysian Green Technology Corporation (MGTC). The other two are for Purpose P.29, Item 03200 – Sabah Electricity Sdn. Bhd. (SESB), and Purpose P.29, Item 11400 – Sabah Water Supply Scheme.

Okay, the Honourable Minister himself is listening here. This matter has often been brought up in this august House, Mr Chairman. I want to repeat, the systems that supposedly we already have plans to build, the Malaysian Go Green system, our buildings, Mr Chairman, do not need much energy anymore to buy fuel or generate power. We must have the use of solar, glass and beautiful landscaping, which are very sophisticated, like those found in developed countries, Honourable Minister, as I have seen. I want to ask the Honourable Minister now. How many buildings have we built in Malaysia? What are the benefits in terms of cost, for example, and living comfort, saving electricity or water, where there are buildings where we can catch rainwater, which can be treated to be used for gardens or our parks. Or we encourage the local authorities (PBT) to create water reservoirs, reducing areas that are often hit by floods, for example. So, have programmes like this been explored by the ministry, which has been mentioned several times before? We see Malaysians waiting, where in fact this plan has been established.

Honourable Minister, another matter I mentioned earlier, which concerns electricity in Sabah. The people of Sabah have indeed been said to be one- complaining. The word is, complaining about the ministry. Previously, when the former Honourable Minister who looked after this ministry, promised that within two or three months, everything would be resolved. The Honourable Minister also recently made a statement in the newspaper, that soon we will resolve the electricity problem in Sabah. Honourable Minister, I want to ask what and where are the plans that can solve the frequent blackout problem in Sabah? The people want to hear with certainty. Not like the Honourable Member for Seputeh, who came to Sabah and misled the people of Sabah. Deliberately wanting to smear the government, but our government is indeed caring. I have confidence because the Honourable Minister himself is from the state of Sabah. He indeed has a sincere heart and intention to create a comfortable atmosphere for...

Puan Teresa Kok Suh SimDAP · PHSeputeh

[Bangun]

Why are you standing? Do you want to interject?

Puan Teresa Kok Suh SimDAP · PHSeputeh

Ya.

Okey.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Honourable Member, do you actually mean that this Honourable Minister from Sabah has done nothing for the people in Sabah? That is why the Sabah State Government banned me from entering so that I would not raise the complaints of the people.

This Honourable Member for Seputeh is always very negative and pessimistic. He is a person who— there is no person in the state of Sabah who is not concerned about the state of Sabah. Honourable Member for Seputeh, I ask the Honourable Member for Seputeh himself, is the Honourable Member for Seputeh, who is from the Seputeh constituency, not attached to his own constituency? Is he or isn't he? If the Honourable Member for Seputeh does not feel that way, surely the Honourable Minister does not feel for the state of Sabah. So indeed the Honourable Minister intends to create a comfortable atmosphere for the state of Sabah. One more thing, the billing system. I agree with the Honourable Member for Pokok Sena. Many people say that the price of electricity provided by this billing system has increased. Many. So this is also a problem and I hope the Honourable Minister can explain to the people why suddenly the electricity bill has increased. From the old billing system until now, about 30 percent, 40 percent higher than usual. I do not know why, perhaps the management of that system is different. Also the water supply problem. The water supply, if we look at what the Honourable Minister has said, and what has been made viral on social media. Sometimes they deliberately show pipes that are the colour of Milo. I do not know if it is deliberate. Perhaps it is the work of the opposition. Perhaps it is the work of the opposition trying to smear the water system in Sabah.

If that is not correct, Honourable Minister, I ask the Honourable Minister to look into it so that this matter is corrected, if it is correct. Especially the water in Ranau.

[Bangun]

Just recently in Ranau, I see all the water pipes in Ranau are misty, the people of Sabah say "kabut", Honourable Minister. I understand the Honourable Minister understands this is "kabut". So— what is this, Honourable Member for Batu? Batu has no problem. Only we have a problem.

Honourable Member for Putatan, this misty water cannot be the fault of the opposition.

Puan Teresa Kok Suh SimDAP · PHSeputeh

[Menyampuk]

I want an explanation from the Honourable Member for Putatan, what evidence does the Honourable Member for Putatan have to show that there is interference from the opposition?

Okey, okey.

It is not the opposition who chose the Sabah Water Department, the hundreds of millions, billions, that are owned by the Honourable Member for Batu or anyone else.

Datuk Dr. Ewon EbinUPKO · BNRanau

[Bangun]

If that is indeed evidence, please give clarification.

Thank you, Honourable Member for Batu. Yes, Honourable Member for Ranau?

Datuk Dr. Ewon EbinUPKO · BNRanauEN

Okay, thank you, Honourable Member for Putatan. Thank you, Mr Chairman. Does the Honourable Member for Putatan agree that in the state of Sabah, about 70 percent of the villages there already have pipes? Only the water supply is sometimes not yet available. So does the Honourable Member agree that the ministry should do its best for the areas, especially in rural Sabah, so that they can get clean water supply? Because at present, Mr Chairman, there are still many people there who use gravity water pipes. So another matter mentioned by the Honourable Member for Putatan just now is about the water that looks like Milo. That usually happens during the rainy season, mud flood, but now there is none anymore.

Thank you, my friend the Honourable Member for Batu. Honourable Member for Batu, I cannot answer. Let the Honourable Minister answer. What I said just now is not an accusation but perhaps the opposition's game. There is a possibility that some there deliberately smear. Okay. The problem in Ranau...

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

May I intervene on Sabah?

The Honourable Member for Ranau is correct.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Hello? Honourable Member for Putatan. Honourable Member for Putatan. May I intervene?

Perhaps there is a leakage problem. Perhaps there is a tank contamination problem. That is what we must look at, and whether the people want to hear an explanation or not...

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Honourable Member for Putatan, may Sabahans intervene?

Wait, wait. Let me finish first. Later I will give you a chance. Perhaps this NRW is also too high in the state of Sabah. So with the allocation of RM132 million, Honourable Minister, I hope the NRW problem can be resolved. Yes, Honourable Member for Kota Kinabalu. You want to say something?

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Thank you, Honourable Member for Putatan. Thank you, Mr Chairman. I want to ask about the status of the power station in Lahad Datu... [Recording unclear] Power station. What is the position now? Second, we must also not forget Tawau. That is one what you called it, another I know, there is one more power station. That is using heat to generate power in Tawau. What is its status now?

Thank you, the Honourable Member for Kota Kinabalu. My time is up. Later the Honourable Minister can answer. With those words, Mr Chairman, I beg to support. Because actually there are still many other matters, but the Honourable Member for Kota Kinabalu is disturbing.

Mr ChairmanEN

The Honourable Member for Parit Buntar.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Thank you, Mr Chairman. I have only one item on which I wish to seek an explanation from the Minister, namely Item 050000 – Special Programmes, under Item 050200 – Malaysian Green Technology Corporation (MGTC). My first question is this: from 2010 to 2016, since it was launched, the Government estimated that it would end in 2017 with a total financial approval of RM3.5 billion. So it is proper for Members of Parliament to be given an explanation, first, on the status of this Malaysian Green Technology Corporation, in terms of how many companies have applied for this scheme. I have also been informed that every company eligible to apply for this scheme must first obtain what is called a Green Project Certificate, and only then is it eligible to apply. My question, Mr Chairman, is firstly, how many companies have applied based on the eligibility of the GPC in question? Or how many companies have a Green Project Certificate but their applications were not approved? Thirdly, I want to know the companies that are given priority, namely energy, water, waste management, as well as buildings and transportation. I want to know, across all those segments, how many companies have been accepted or had their applications approved under this scheme for the categories I have mentioned. Those are my questions on the Malaysian Green Technology Corporation. Since, as far as I am still in this House, Mr Chairman, the country's great aspiration towards green technology has been allocated a large budget. So it is proper for us to know how far green technology has achieved and how we are going to handle a problem where, at the same time, we want to encourage green technology but the cost of building green technology itself is very high. So, how can the Government provide encouragement apart from giving this green technology scheme? How about the costs involved in environmentally friendly, green buildings? This includes how architectural firms are also given an incentive to design such environmentally friendly buildings. Is there also— I still remember my question, Mr Chairman. I asked the Minister, and the Minister replied that government buildings would be given priority in implementing this technology. I want to know now, what percentage of government buildings have truly complied with the green technology standards in terms of water and energy savings, and in terms of other technologies adopted? This is because if the Government has succeeded in showing a model example of green technology in terms of its environment and buildings, I also wish to request the Minister that green technology be extended to private companies by providing certain incentives, so as to encourage them to apply green technology, for example tax deductions or tax credits when a company uses this green technology. So, I hope the Minister can give an answer. I do not want to hear a written reply, because I think 2010 to 2016 is a long period given for us to evaluate, since it will end in 2017. When it ends, or when we reach the financial approval of RM3.5 billion, we want to see where this money has gone. Has green technology truly been able to be applied in our country? Because we already know this ministry was established to make our needs a content of becoming a nation able to face energy issues, which among other reasons is to minimise degradation to the environment, to reduce the impact or effects on the environment. The second is to achieve zero or low greenhouse gas emissions.

Dato’ Dr. Mujahid bin Yusof RawaAMANAH · PHParit BuntarEN

Third, safe for use and improve the environment of all forms of life, conserve energy and natural resources, and finally, promotes the use of renewable resources. Has all of this been achieved? If not, why not? And in an economic situation that we are all well aware of, to what extent has priority been given so that all these objectives and criteria can be achieved in implementing the national green policy.

Mr ChairmanEN

The Honourable Member for Bandar Tun Razak.

Bismillahir Rahmanir Rahim. Mr Chairman, I wish to take part in the discussion on item P.29 in the Budget 2017 and Item 010000 – Governance, Item 010100 – Administration, Item 09100 – Selangor State Water Supply Scheme, and Item 11200 – Inter-State Water Transfer. All these matters are related to the first, the implementation of the Water Services Industry Act 2006 or Act 655, and also cover the roles of the Ministry of Energy, Green Technology and Water, SPAN, PAAB, the Ministry of Finance and the Selangor State Government. Mr Chairman, the people of Selangor thank the Federal Government for providing financial support amounting to RM9.65 billion for the Selangor State Government to take over all the shares in the water concessions in Selangor, namely ABASS, Puncak Niaga, SYABAS and SPLASH. These concessions cover the management and operation of treated water, not only in Selangor and Kuala Lumpur but also in Putrajaya. I have also submitted a Parliamentary question PR1343L7653, in which Bandar Tun Razak requested that the Minister of Energy, Green Technology and Water state all the terms and conditions of the agreement between the Selangor State Government and Perbadanan Aset Air Berhad in the restructuring of the state water industry, and the impact on that agreement should the total takeover amount exceed RM9.65 billion. That matter has already been answered by the Honourable Minister, but what is important is that I wish to state in that answer that the total cost of restructuring the water supply industry of Selangor, the Federal Territories and Putrajaya, including the financing of the takeover of all the equity and liabilities of the four concession companies in Selangor, as well as the Federal Government's debt under the Selangor State Government, will affect the adjustment of water tariffs, the water lease rental of Selangor to Pengurusan Aset Air Berhad (PAAB), and the assets to be charged to PAAB. What is clear is that the higher the takeover price, the greater the impact on the increase in water tariffs and lease rentals to PAAB.

[Deputy Speaker (Dato' Sri Haji Ismail bin Haji Mohamed Said) chaired the Committee] It is expected that, according to the Honourable Minister's answer, the total takeover amount will exceed RM9.65 billion. This is because there are some liabilities of the concession companies that were not listed previously, as well as additions to the value of the takeover of Syarikat Pengeluaran Air Selangor, SPLASH, by Air Selangor, which have not yet been finalised. Mr Chairman, therefore, for the welfare of the people of Selangor, the Federal Territories and Putrajaya, this takeover must be at a reasonable price and must not burden the people, the water consumers, who number more than 5 million residents. I believe the Federal Government is acting fairly, while the concessions do not suffer losses from the purchase of the assets and equity of the concession companies. However, the Federal Government and the Selangor State Government must also act fairly towards the people of Selangor, Kuala Lumpur and Putrajaya, by not burdening the people when they receive the additional costs of taking over the concession assets. If so, the increase will result in higher water prices for the people.

Therefore, the Federal Government and the state government must uphold the value in that agreement, namely RM9.65 billion. I also note that there are rumours that the state government is accepting a further increase in payments to SPLASH beyond what was promised in that agreement. What was offered was equity of RM250 million and liabilities of RM1,584 million, totalling RM1,834 million. The dividends already taken by SPLASH amount to RM725 million, with capital of only RM400 million. The total sum is RM2,559 million. With the value offered, SPLASH has already obtained excessive profits. Yet they are being paid at an even higher price. The impact will burden the people of Selangor for the next 30 years. Mr Chairman, the issue haunting the people of Malaysia is that the terms of privatisation, whose profits are heavily weighted in favour of the concession holders.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

The Honourable Member for Sungai Besar.

This includes the privatisation of electricity, highways, hospital construction and many more. So the calculation...

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai Besar

Tidak nampak.

...According to the study, the profits are lopsided.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Two people have stood up, interested. Which one?

Thank you, Mr Chairman, and thank you, the Honourable Member for Bandar Tun Razak. Just a little, Honourable Member. Mr Chairman, I was surprised by what the Honourable Member for Bandar Tun Razak stated regarding the concept of concessions and also this principle. I want to ask the Honourable Member for Bandar Tun Razak. I read the letter sent by the Honourable Member for Bandar Tun Razak to the Honourable Member for Marang on this issue. In the view of the Honourable Member for Bandar Tun Razak, is it because the Honourable Member for Bandar Tun Razak wanted to uphold the principle of protecting the people of Selangor that the Honourable Member for Bandar Tun Razak was removed from being the Menteri Besar of Selangor? Thank you, Mr Chairman.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

I would like to make a small addition, Honourable Member for Bandar Tun Razak, if I may. Okay, regarding the difference from this RM9.65 billion, there is an additional RM2.7 billion. This financing, based on the Honourable Member for Bandar Tun Razak's experience, who will actually finance the excess over the amount requested by SPLASH? That is all.

Whether I become Menteri Besar or not is not a question for me, but I wish to pursue this because I want to show that the profit calculations for the privatisations that I have studied extensively are weighted in favour of the concessions. This means the concessions gain excessive profits, which is permitted, but if the concessions make a loss, that loss is borne by the government through a bailout. So this means the concession parties do not lose at all, and that is precisely why the concession owners are willing to buy with large bonuses to agents to obtain contracts. So, Mr Chairman, I am of the view that this matter must be resolved, and the restructuring of the Selangor water industry is an example of how this solution can be implemented. Mr Chairman, in the case of water, the government allowed a bulk service rate, that is, a bulk service rate implemented for the concession, which permits charging rates that generate very high profit margins, and through this bulk service rate the profit margin is 70 per cent. Although the water price was maintained by the Selangor State Government, SPLASH imposed sales that maintained the price. I wish to inform this House that of every 100 cubic litres of water produced by SPLASH, only 70 cubic litres can be sold because 30 cubic litres are already lost, yet the people of Selangor and the people of the Federal Territories have to pay 100 per cent.

Therefore, it will be the Selangor State Government that raises water tariffs later. I understand that although we now have the power to review this bulk service rate, the Selangor State Government still allows this price to continue, and I request the Honourable Minister that SPAN and PAAB do not allow this high bulk service rate to continue, because this margin is very high, causing SPLASH to be able to demand a high price. The question is, why did PAAB and SPAN allow this to happen? The people of Selangor want an answer. Honourable Minister, finally I request an explanation regarding the additional payment of another RM1 billion, because this payment will have an impact that will burden the people of Selangor. The matter of allowing this bulk service rate to not be continued any further. Honourable Minister, as the Honourable Member for Putatan who has a people's spirit, together with the Federal Government you must show a greater spirit than the Selangor State Government, namely by not raising these water tariffs. Thank you.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Finished, yes. Please, the Honourable Member for Jasin.

Thank you, Mr Chairman, for giving me the opportunity to take part. Firstly, as we are all aware, at this time the people are very anxious. Prices of goods are rising everywhere. Recently goods have risen again, but I hope that TNB, we do not increase tariffs. However, if possible, we should increase our rebate.

Now we give RM20.00. If possible, with the very large profits made by TNB, we should increase our rebate to RM30.00. If we can do this, we can prove that the Government is very caring, especially as we can help the low-income groups, and we can together ensure that the people also share in the profits that TNB has made all this time. Secondly, we see many street lights. There are places that still do not have lights, but ideally TNB, as one of the agencies that monopolise energy distribution, should, if possible, carry out CSR and ensure these street lights can be installed. At the same time, we understand that local authorities will bear all the bills, but what is certain is that the cost of installing these street lights is financed by TNB. And thirdly, we hope that TNB, as a caring agency, can, if possible, carry out CSR, in particular giving allocations to the Parliamentary bodies for repairing the houses of the poor. Furthermore, for any houses that still need rewiring, because those houses, especially wooden houses, we fear may face various undesirable situations. So we hope that, through the Electricity Supply Industry Trust Account, we can ensure that we are able to help those who are most in need. Next, I go to Item 07400 – Melaka Water Supply Scheme. Secondly, Item 95000 – National NRW, Item 00100 – Energy Efficiency and Renewable Energy Programme, and finally 03202 – Energy Transmission and Distribution. Mr Chairman, the state of Melaka, in fact, we request, if possible, that the ministry provide grants to help all water operators in the state in an effort to reduce NRW. At present, the allocation for Capital Expenditure (CAPEX) projects under PAAB considers this work to fall under the category of maintenance expenditure (OPEX). Efforts to reduce NRW are one of the SPAN KPIs that must be achieved by every state water operator. Unfortunately, the Ministry of Energy, Green Technology and Water (KeTTHA) or the ministry and PAAB do not provide any allocation at all to ensure this effort is achieved.

Keduanya, kita mohon kalau boleh pihak kementerian membantu negeri-negeri yang mempunyai warta defisit seperti negeri Melaka. Dalam perundingan kita antara kerajaan-kerajaan negeri yang berjiran bagi membekalkan air mentah dalam kuantiti yang mencukupi dan harga yang munasabah seperti contoh permintaan Melaka kepada negeri Johor. Kalau negeri Johor boleh membekalkan air dengan begitu harga yang murah kepada Kerajaan Singapura, saya yakin mereka juga tidak ada masalah untuk membuat perkara yang sama untuk negeri Melaka. Seterusnya, kita juga memohon pihak kementerian, kalau boleh kita mohon operator-operator air negeri seperti negeri Melaka dalam kita membuat kajian dan juga pelaksanaan modenisasi Sistem Bekalan Air Negeri terutama dalam kaedah kita untuk merawat air. Ini memandangkan isu kualiti air mentah semakin meruncing dan juga kritikal sejak akhir-akhir ini kerana kebanyakan daripada loji-loji air yang menggunakan kaedah rawatan air secara konvensional di mana ia tidak berkesan dalam usaha kita untuk memproses air yang semakin tercemar sekarang. Seterusnya adalah diharapkan supaya pihak kementerian perlu memainkan peranan dalam menyelaraskan piawaian sumber air mentah yang terletak dalam kawasan-kawasan tadahan air. Buat masa ini, kita dapati tiada pihak yang khusus yang menguatkuasakan piawaian dan terdapat piawaian-piawaian yang sebenarnya tidak menepati kehendak piawaian air mentah kementerian, waktu Kementerian Kesihatan Malaysia pada ketika ini. Contohnya, macam kita buat pelepasan air buangan dari kolam yang melebihi daripada piawaian Kementerian Kesihatan Malaysia. Seterusnya kita juga memohon pihak kementerian supaya dapat membantu dalam pelaksanaan amalan hijau di loji-loji air melalui sektor ataupun dasar hijau kementerian. Dalam masa yang sama kita berharap juga pihak kementerian supaya membantu kerajaan negeri dan membangunkan sumber-sumber air mentah yang baru dan juga yang mempunyai potensi seperti air bawah tanah dan juga penyulingan air laut memandangkan permintaan air semakin bertambah ekoran daripada pembangunan negeri Melaka yang begitu pesat sekali pada ketika ini. Apatah lagi kita bakal mendapat pelaburan yang cukup banyak daripada negeri China, jadi kita berharap semoga keperluan air ini dapat diatasi. Terakhirnya, saya mohon kalau boleh pihak kementerian dapat membantu menyelesaikan isu tarif elektrik TNB, memandangkan industri air dan TNB ini memainkan peranan yang sama dalam memberikan perkhidmatan kepada orang ramai. Akan tetapi apa yang terjadi pada ketika ini, pihak air negeri Melaka dikenakan tarif seperti kadar industri. Jadi kita berharap kalau kadar dapat dikurangkan. Kita yakin kedua-dua industri dapat memainkan peranan yang sama dan memberikan perkhidmatan yang paling terbaik sekali kepada rakyat. Terakhirnya Mr Chairman, saya ingin mengucapkan setinggi-tinggi tahniah kepada pihak kementerian yang akan memperkenalkan satu sistem pengebilan baru TNB. Hanya soalan saya kepada pihak kementerian, adakah pihak kementerian telah membuat kajian, penyiasatan tentang apakah sebenarnya akibat daripada pengenalan sistem pengebilan ini. Kalau ini perkara yang cukup efisyen, kita sangat menyokong bahkan kalau boleh pada ketika ini apa yang dihadapi oleh rakyat, pihak TNB sebenarnya membuat pengebilan yang berlarutan, kadangkala sampai dua bulan, tiga bulan kadang-kadang. Jadi, membebankan rakyat apabila dapat bil, kita tengok dia pun terperanjat nanti dan saya takut nanti dia pun tidak mempunyai keupayaan untuk membayar melainkan kalau pihak TNB membenarkan mereka membuat pembayaran secara ansuran. Saya ingin menyokong. Terima kasih Mr Chairman.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Ramai ya sebab kita minta the Honourable Minister menjawab pukul 6.30 petang. Bermakna daripada pukul 5 hingga 6.30, satu jam setengah dapat kita debate. Kalau boleh singkat-singkatkan ya. Honourable Member for Seputeh, 5 minit. Ya, sila.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Terima kasih, Mr Chairman. Saya tidak akan panjang ucapan saya. Saya sebenarnya setuju dengan Honourable Member for Pokok Sena dan juga tadi the Honourable Member yang ucapan tadi berkenaan dengan sistem pengebilan baru TNB, yang mana saya juga terima aduan daripada orang ramai.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Saya hendak tanya syarikat mana yang memenangi tender untuk menyediakan sistem bil baru untuk TNB ini dan bolehkah the Honourable Minister menyenaraikan kejayaan projek-projek lepas, oleh syarikat ini untuk to justify kenapakah syarikat ini dilantik dan juga kos yang dibelanjakan oleh TNB untuk sistem pengebilan baru ini kerana ia mendatangkan banyak rintihan, sungutan daripada orang ramai. Kenapakah TNB tidak melancarkan satu kempen penerangan yang menyeluruh kepada orang ramai khususnya mereka yang duduk di luar bandar kerana ramai tidak sedia tentang sistem baru ini dan tidak jelas. Mereka yang sentiasa mengadu ke Pejabat Wakil Rakyat. Mr Chairman, saya hendak juga sentuh sedikit tentang 03200 – Sabah Electricity Sdn. Bhd. kerana apa yang disebutkan oleh Honourable Member for Putatan tadi yang kata tentang air di Sabah itu macam coklat dan Menteri adalah dari negeri Sabah.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Saya duduk sini, ini mengingatkan saya tentang kes skandal di pejabat Water Department in Sabah yang mana mengikut laporan akhbar ialah sebanyak RM114 juta diserbu oleh Malaysian Anti-Corruption Commission (SPRM) daripada Pengarah dan Timbalan Pengarah pejabat Jabatan Air Negeri Sabah ini. Jadi saya lihat di bawah butiran ini di mana kerajaan memperuntukkan RM2,455 juta untuk Jabatan Air Negeri Sabah itu. Saya nak tanya sebenarnya, adakah ia makan kepada peruntukan daripada Kerajaan Pusat dan juga apakah ada apa-apa kaitan dengan di bawah kementerian ini? Saya juga ingin tanya tentang perkhidmatan pembetungan di bawah Item 040000 di mana banyak projek− saya nak menghargailah penambahbaikan pembetungan ini diadakan tetapi kita lihat kalau di Klang Valley saya lihat ada banyak tempat menyebabkan kesesakan trafik. Adakah projek ini dapat dipercepatkan lagi? Ini kerana banyak jalan yang utama macam di PJ, macam di beberapa buah tempat di Jalan Ipoh dan kawasan saya ini, ia menyumbang kepada kesesakan trafik. Jadi adakah kementerian, bolehkah minta pihak kontraktor mempercepatkan penambahbaikan pembetungan ini supaya ia tidak menyumbang kepada kesesakan trafik? Saya juga lihat bajet untuk tahun depan ini berbanding dengan tahun ini, di bawah perkhidmatan pembetungan telah ada pengurangan sebanyak RM4 bilion. Jadi, adakah yang pengurangan peruntukan ini akan menjejaskan ataupun akan menyebabkan kerja penambahbaikan pembetungan ini dilambatkan lagi? Sekian, terima kasih.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Ya, tidak sampai lima minit. Ya, the Honourable Member for Parit Sulong.

Dato’ Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Terima kasih saya ucapkan kepada Mr Chairman. Saya terus sahaja kepada butiran. Pertamanya Item 010000 – Tadbir Urus. Saya tengok dalam maklumat yang diberikan kepada kita semua, ada sasaran untuk tahun 2017, sasaran sebanyak sepuluh forum dan juga bengkel dan ada juga sasaran ataupun anggaran sebanyak 510 promosi publisiti untuk menjaga imej dan mempromosi dasar dan juga program dan aktiviti kementerian. Jadinya berdasarkan kepada ini, saya hendak bertanya kepada pihak kementerian. Siapakah strategic international partner, with permission kepada pihak kementerian dalam menganjurkan semua program untuk tahun 2017 ini? Seterusnya untuk Item 00107 – Projek Teknologi Hijau. Berlaku pengurangan peruntukan daripada RM11.99 juta pada tahun 2016 kepada RM9.46 juta sebagai anggaran tahun 2017. Jadi sehubungan dengan itu, saya hendak bertanya mengenai adakah projek pembangunan teknologi hijau di Malaysia ini akan terjejas berikutan daripada kekurangan peruntukan ini? Keduanya, saya hendak minta penjelasan daripada pihak kementerian mengenai adakah kementerian bercadang untuk melaksanakan pembinaan premis berdasarkan mesra alam ataupun, with permission, eco-friendly dan penggunaan tenaga elektrik yang minimum, sejajar dengan pembangunan sosioekonomi dan meningkatkan kesedaran masyarakat terhadap teknologi hijau?

Dato’ Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Seterusnya Mr Chairman, Item 00100 – Program Kecekapan Tenaga dan Tenaga Diperbaharui. Akan tetapi dalam ini saya tengok ada peningkatan dari tahun 2016 dan anggaran pada tahun 2017. Jadinya melalui penambahan peruntukan ini, saya cuma nak bertanya kepada pihak kementerian, apakah perancangan dan juga langkah proaktif dalam mengorientasikan semula industri-industri sedia ada untuk mempraktikkan amalan teknologi hijau ini serta mempergiatkan? Adakah juga kementerian akan mempergiatkan strategi pembangunan dan penyelidikan dalam teknologi hijau ke arah pengkomersialan bagi pasaran tempatan terutamanya di kawasan-kawasan luar bandar seperti kawasan Parlimen Parit Sulong? Seterusnya yang terakhir ialah Item 00100 iaitu Program Kecekapan Tenaga dan Tenaga Diperbaharui juga di bawah tajuk ataupun butiran yang sama. Baru-baru ini di US ada seorang technopreneur yang bernama Elon Musk yang telah memperkenalkan serta mengkomersialkan produk-produk yang menggunakan teknologi hijau serta tenaga boleh diperbaharui seperti kereta Tesla serta bumbung solar. Sehubungan dengan itu, saya hendak bertanya kepada pihak kementerian, sebagai sebuah negara yang menerima pancaran cahaya matahari selama enam jam sehari serta peningkatan peruntukan daripada RM26 juta kepada RM32 juta, adakah pihak kementerian mempunyai apa-apa cadangan untuk menjadi Tesla South East Asia, with permission untuk menjadikan Malaysia ini sebagai hab tenaga boleh diperbaharui terutamanya dalam bidang tenaga solar. Seterusnya, adakah pihak kementerian boleh mencapai matlamat yang diletakkan oleh United Nations dalam Sustainable Development Goals ataupun SDG, nombor 7- iaitu dengan izin, “...ensure access to affordable, reliable, sustainable and modern energy for all.” Terima kasih.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Ya, tidak sampai 5 minit, 4 minit saja. The Honourable Member for Kota Kinabalu.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Terima kasih Mr Chairman. Pertama sekali, berapakah peruntukan yang diberikan kepada Sabah untuk bekalan elektrik dan air pada tahun 2016 dan 2017, Minister?... [Interjection] Di bawah Item 010200 dan 03200, bolehkah kementerian memberikan jaminan supaya SAIDI di Sabah boleh diturunkan ke tahap yang sama seperti di Semenanjung? Bagi pastikan satu masa, lima tahun atau sepuluh tahun. Ini kerana masalah bekalan elektrik di Sabah masih berada di tahap yang tidak memuaskan. Mr Chairman, saya ingin tahu, apakah perkembangan atau status Empangan Tawau. Projek Tawau Dam ini sudah dirancang lebih tiga puluh tahun yang lalu, dari zaman PPS lagi. Kos untuk pembinaan Tawau Dam ini juga semakin tinggi. Masalah krisis air di Tawau juga semakin serius. Saya masih lagi ingat lagi Menteri ada bagi jawapan bila saya tanya, “Bila empangan akan dibina?”. Jadi Menteri ada jawab kata, bulan Jun itu sudah ditender. Jadi saya ingin tanya, sudahkah projek ini ditender? Saya juga mahu tanya the Honourable Minister kerana the Honourable Minister kata duit RM400 juta itu sudah disalurkan kepada Kerajaan Sabah. Jadi, betulkah sudah disalurkan kepada Sabah? Ini pinjaman. Di Semporna pula Mr Chairman, bekalan air selalu terputus dan peniaga terpaksa membeli air pada harga yang tinggi untuk menampung keperluan air yang kritikal. Sebetulnya Mr Chairman, selalu masa bila ramai pelancong, masa itu air putus, berkali-kali macam ini...

[Dewan riuh]

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Jadi saya- ya, ngam-ngam lah musim itu dia makan...

Suspense Oh! Suspense.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Cari makan punya hal ini. Jadi, pelancongan di sana tiap-tiap minggu hanya dapat dua hari air, lagi lima hari kena beli air. Jadi macam mana ini? Satu tempat yang banyak potensi untuk pelancong tetapi jabatan air, potong angsa sebelum dia lahirkan telur. Jadi saya haraplah MACC dan Menteri siasat, adakah makan duit di sana, jual air?

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Ya, the Honourable Member for Julau bangun.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Nanti dahulu. Di sini saya ingin tahu juga, adakah...

Kasilah, Honourable Member for Kota Kinabalu. Takutlah.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

...Berkaitan menjual air ini jadi sebahagian dari program kementerian untuk memberikan air kepada peniaga orang yang ramai? Adakah harga air yang dijual kepada peniaga ini berpatutan? Masalah ini juga berlaku di Pulau Banggi. Kenapa Jabatan Air Semporna tidak selesaikan masalah ini secepat mungkin? Adakah pegawai-pegawai Jabatan Air Semporna bekerjasama dengan pihak lain untuk mendapatkan keuntungan? Saya minta kementerian siasat. Begitu juga dengan Malaysian Anti-Corruption Commission (SPRM). Saya bagi satu contoh yang bagus. Apabila saya lawat Sarawak, saya nampak bahawa di Jabatan Air, banyak lori tersedia di Jabatan Air. Apabila tiada air, terus hantar. Kerana apa? Kerana Sabah tidak ada Jabatan Air...

Eh, Selangor macam mana Selangor? Selangor boleh buat itu macam kah? Boleh hantar air kah Selangor?

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Ya, saya sedikit lagi. Mr Chairman, adakah ini seperti skandal water gate di Jabatan Air Sabah di mana 60 peratus peruntukan Kerajaan Persekutuan masuk ke dalam poket pegawai rasuah?

Selangor sudah selesai kah Selangor?

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Kes rasuah Jabatan Air Sabah ini amat memalukan. Daripada RM3.3 bilion peruntukan Kerajaan Persekutuan, 60 peratus masuk dalam poket pegawai yang rasuah. Ini ada RM2.2 bilion. Akan tetapi cari balik hanya RM120 million.

Masa sudah habis. Masa sudah habis.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Yang Berhormat, mana itu RM1.8 bilion, mana? Masuk poket? Adakah masuk poket the Honourable Minister atau officer number one di Sabah?

Selangor pun tidak ada airlah. Itu kerajaan negeri...

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Apakah pandangan the Honourable Minister dalam hal ini? Sekian, terima kasih.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Sungai Besar.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

Izinkan Sungai Besar ambil bahagian dalam perbahasan peringkat Jawatankuasa Kementerian Tenaga, Teknologi Hijau dan Air (KeTTHA) berkaitan isu air. Butiran akan saya perincikan. Di Selangor, alhamdulillah, kita ada air percuma. Namun, apa maknanya air percuma kalau tidak ada air terutama di Semenyih? Apa maknanya air percuma kalau Kajang dengan Puchong pun banjir? Saya akan rujuk kepada Item 020000 – Pasukan Projek Penyaluran Air Mentah Pahang ke Selangor, Item 09100 – Rancangan Bekalan Air Negeri Selangor, Item 11200 – Penyaluran Air Antara Negeri.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

Mula-mula kita beri gula-gula air percuma, akhirnya air naik juga. Ini kisah Langat 2. Akhirnya sejumlah 1,890 juta liter air mentah akan disalurkan dari Pahang ke Selangor. Masuk ikut terowong, keluar Empangan Kelau, Muka Sauk dan akhirnya dirawat di Loji Langat 2. Kenapa Langat 2 ini penting? Semenjak tahun 2000, ia telah dipersetujui tetapi sehingga kini, Langat 2 masih lagi belum siap. Maklumat yang kita perolehi dijangka siap tahun 2017. Marilah kita berdoa dan berusaha. Persoalannya, kenapakah Langat 2 masih belum siap? Apakah faktor-faktor yang menyebabkan yang menyumbang kepada kelewatan ini? Jadi bersetujukah pihak kerajaan, kajian dibuat oleh KeTTHA merujuk jika Langat 2 tidak siap, kita akan berhadapan dengan risiko masalah bekalan air di Lembah Klang? Dalam pembinaan Langat 2, sebanyak RM3.935 bilion kos yang akan digunakan dalam penyaluran air antara negeri. Ini boleh dilihat dalam Item 11200. Mengapakah Langat 2 ini penting? Langat 2 ini penting kerana ia akan memberi kemudahan kepada 8.18 juta orang. Selangor sahaja sekarang ada 6.31 juta, Kuala Lumpur ada 1.77 juta, Putrajaya kita ada hampir 100,000 orang. Mengapakah Langat 2 ini penting? Kerana penggunaan air domestik Selangor, Kuala Lumpur dan Putrajaya menggunakan air yang paling tinggi di Malaysia. Rekod SPAN menunjukkan rizab margin 0 peratus di Selangor. Apa maknanya? Maknanya sekiranya terdapat kemarau panjang, Selangor akan menghadapi masalah. Apa persoalan yang saya hendak sebutkan? Langat 2 dijangka akan siap pada tahun 2017. Dalam masa yang sama pula, saya difahamkan akan ada Loji Labuhan Dagang dan Semenyih 2 sebanyak RM800 juta. Ini disebut oleh Menteri Besar baru-baru ini. Persoalannya, Labuhan Dagang siap, Langat 2 siap, tidakkah ini akhirnya akan menyebabkan pembaziran berlaku? Kerana, saya hendak merujuk kepada perkara apa? Saya hendak merujuk kepada kalaulah RM800 juta itu digunakan untuk melihat kepada NR water, baik pulih, soal paip yang usang, karat- dan, adakah feasibility studies sudah dibuat terhadap pembinaan Labuhan Dagang ini? Ini pohon penjelasan daripada peringkat pihak kementerian. Di Selangor ini ada angka popular. Ambil alih keseluruhan RM9.65 bilion. Ini disebut di peringkat awal. Kemudian disebut lagi Syarikat Pengeluar Air Sungai Selangor (SPLASH) di peringkat asalnya RM250 juta, kemudian harga negotiation yang memohon kepada RM2.7 bilion. Saya bertanya kepada pihak kerajaan, peningkatan RM250 juta kepada RM2.7 bilion ini, siapakah sebenarnya yang membiayai? Kerajaan Pusat kah, kerajaan negeri kah, ataupun siapakah entiti-entiti yang terlibat dalam perkara ini? Sebagai MP yang bertanggungjawab, saya akan berhenti sebelum lima minit masa yang diberikan. Terima kasih.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Ya, the Honourable Member for Bukit Katil.

Terima kasih Mr Chairman. Saya hendak mulakan dengan mengungkapkan Item 11200 – Penyaluran Air Antara Negeri dan juga Item 07400 – Rancangan Bekalan Air Negeri Melaka. Bulan lepas, Mr Chairman, negeri Melaka menghadapi masalah kekurangan bekalan air terutamanya yang menarik ialah di kawasan tadahan. Ada tempat di mana hujan lebat tetapi ada di kawasan tadahan tidak ada hujan. Justeru, kita saksikan catuan air hampir sahaja dilakukan di negeri Melaka pada bulan yang lalu. Saya ingin tanya kepada kementerian, adakah the Honourable Minister sedar bahawa sebenarnya permintaan air di negeri Melaka sekarang ini telah pun mencecah 500 juta liter sehari? Untuk sistem perbekalan air yang ada sekarang ini, the Honourable Minister, dijangkakan hanya sehingga tahun 2017.

If nothing is done, we will face a water problem. As happened at the Durian Tunggal Dam from 1991 until 1992, we witnessed how the dam ran dry and caused a water problem for 600,000 residents of the state of Melaka. We do not want what happened in Pahang, where recently the Tengku Mahkota of Pahang had to issue a royal command for the State Government of Pahang to resolve the problem and pay serious attention to the cut-off of water supply in several districts. So I want to begin with that, because I think in the state of Melaka we must surely have various strategies. I would like to ask the ministry whether there has been a more detailed discussion between the Federal Government and the state government, at the very least to ensure that the main dam, namely the Durian Tunggal Dam, has more effective ways to ensure that the water supply is not cut off in the times to come? Second, Mr Chairman, concerns the water tariff. I would like to inform the Honourable Minister, and I believe I have often raised this matter in debates in past years, namely the free water kiosk service provided by myself to the people in the Bukit Katil area. We have seen tariff increases which I think are unreasonable.

For example, when the supply of free filtered drinking water was provided, initially a charge of RM1.65 sen per cubic metre was imposed in 2014. Then the rate rose to RM4.00 per cubic metre. We have already written to the ministry to ensure there is a discussion on why this tariff has increased. Now, for the Honourable Minister's information, it has increased to RM7.00 per cubic metre. So, when we bring it to discussion, and we have already held discussions, it becomes like a football. At one moment they say it is SPAN, at another it is Syarikat Air Melaka. So, I would like to inform the Honourable Minister that these free water kiosks actually help the people in my own constituency because they certainly provide a little convenience. We are also well aware of how recently the Honourable Minister said that mineral water is far more expensive than petrol. So, when a group provides free water, please do not burden them with such high tariffs, when we seemingly have no basis. I discussed with the Ministry of Health, for example. The Ministry of Health waived for us the permit and imposed extra payments on us because we provide it free of charge. But I also hope the Ministry of Energy, Green Technology and Water (KeTTHA) can have a bit of compassion and give us some facilities. Because if we calculate, and I think the current situation is difficult, people take water there, and in one month we have to pay RM700 to RM800, and we have no source of income, Honourable Minister. Unless we have a source of income, it's okay. We have no source of income. We really give it, and I have three or four machines within my Parliamentary constituency. So, just imagine, Honourable Minister, how much I have to bear this huge amount in order to serve the people. So, I ask that it be waived. We are not asking to be paid back, but at the very least for the future, we hope this matter can be studied so that RM7.00, which according to the information I received is only given to machines that are charged, but why is the free one being charged? So I hope these issues can be given firm attention by the Honourable Minister. Thank you.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Sekijang.

Tuan Anuar bin Abd. ManapUMNO · BNSekijangEN

Thank you, Mr Chairman. I go straight to Item 06400 – Johor State Water Supply Scheme; involving an allocation of RM34.5 million.

Tuan Anuar bin Abd. ManapUMNO · BNSekijangEN

The water supply problem in Johor is also seen to be increasingly urgent, caused by the decline of water resources in several rivers and also water catchment areas. This is proven when, a few months ago, we saw several districts and areas in the state of Johor having to be supplied with water through intermittent water supply. Therefore, I would like to thank the Federal Government for taking the right action and decision through the Eleventh Malaysia Plan to overcome the water problem in the state of Johor, namely by approving the Congok Dam Upgrading Project in Mersing while awaiting the Kahang Dam in Kluang, which is expected to be completed by the middle of next year. I seek cooperation from the ministry, if possible, that the Kahang Dam can be completed by the middle of next year. At the same time, I hope the Federal Government can fulfil the application for an allocation of RM180 million from the Johor State Government for the construction of the Meda Dam in Muar. There is an urgent need because this dam will function to prevent salt water from entering the Muar River during high tide. I would also like to ask the ministry about the latest developments of the Iskandar Malaysia Raw Water Transfer Project (PAMIM), which is planned jointly between the Federal Government and also the state government. Next, Item 03202 – Transmission and Distribution (Energy); involving an allocation of RM15 million. I would like to touch on TNB. We know that several Honourable Members have already mentioned matters relating to TNB, including the new intake system. I would like to obtain an explanation from the ministry: what is the rationale behind the change to this new system? To what extent has TNB explained to consumers the problems and implications arising from this matter? Has TNB conducted any early briefing programmes before this? Although it is said that notices have been issued, we know there are still consumers who are rather burdened by the issue of two-month bills. I would also like to obtain certainty: is there any refund that TNB has had to make as a result of the error in the payment amount recorded in the bill that consumers had to bear? For those whose monthly bills were previously under RM20, as we know, were not charged any payment, but when the new two-month system bill arrives and it becomes perhaps close to RM40, are they also charged by TNB? Lastly, Item 00100 – Energy Efficiency and Renewable Energy Programme. I recall that in RMKe-11, we emphasised energy efficiency and renewable energy. Only I would like to ask the ministry, there are several projects related to solar energy carried out in the state of Johor. It is said they face difficulties in being approved because some parties, including from the Public Works Department (JKR) itself, cannot approve the projects concerned because they are not within their field. So, has the ministry cooperated with other ministries, especially this Ministry of Works, to ensure that JKR technicians, when projects involving solar energy are concerned, can assist in the approval of these projects, especially projects that are people-friendly? So, that is all, Mr Chairman. I am also like the others, I want to speak for less than 5 minutes. Thank you and I support.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Hulu Langat.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Thank you, Mr Chairman. In the name of Allah, the Most Gracious, the Most Merciful. I refer to Item B.29 – Item 020000 – Pahang to Selangor Raw Water Transfer Project Team amounting to RM2.95 million. This amount is rather small.

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

So my question is, will this small amount be used for the transfer of water from Pahang, or is the infrastructure already complete, merely waiting for Langat 2 to be completed? Thank you, Sungai Besar, for giving confidence that Langat 2 is important. I would like to refer to Item 040000 – Sewerage Services. Amounting to RM19.15 million. Surely this RM19.15 million cannot be used for infrastructure, but can this value be used to manage the contractors who carry out the installation of sewers and the construction of treatment plants? This may be linked to P.29 Item 80000 – National Sewerage Project amounting to RM510.7 million. Will this be used for the installation of pipes and also the construction of treatment plants? I would like to seek the goodwill of the Honourable Minister to explain the success of the centralised sewerage system that has already been completed in our country. Mr Chairman, Item 00100 – Energy Efficiency and Renewable Energy Programme; amounting to RM32.65 million. What savings have been generated from government buildings as a result of the energy efficiency practices that have already been carried out? If it has yielded good, positive results, then I propose that it be extended to state government buildings, private buildings and individuals. How much savings have been generated from Federal Government buildings that have already been fitted with solar cells or photovoltaic cells, or to what extent has the net metering programme achieved success? Can it also be extended to state government buildings?

Dr. Che Rosli bin Che MatPAS · PRHulu LangatEN

Lastly, Item 050200 – Malaysian Green Technology Corporation (MGTC) located in Bangi, but perhaps I may not have the opportunity to visit this building or this office. So I would like to obtain an explanation of their success in continuing what was discussed by the Honourable Member for Parit Buntar. Likewise P.29, Item 001007 – Green Technology Project amounting to RM9.47 million. What form of green technology project will be developed to realise a green nation? Thank you.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Sik.

Thank you, Mr Chairman. I have a few points, just a little, namely I go straight to Item 06500 – Kedah State Water Supply Scheme. I want information and an answer from the Minister. If the Minister does not have time, the Minister may answer in writing, a written reply. In my constituency there are two dams: first, the Gubir Dam for hydroelectric power generation. Second, the Beris Dam for drinking water supply. The first dam, namely the Gubir Dam, covers three districts. I understand that they depend on electricity supply from that dam, namely the districts of Sik, Baling and also Padang Terap. I want to know to which areas the electricity generated by the Gubir Dam is sent, apart from these three areas. I also want to know, because of the increasing use of electrical energy from time to time, what the government's plans are to increase the electricity generation capacity from the hydroelectric power of this dam. I also want to know what the current capacity limit is and the level of safety and resilience of this dam, and how often maintenance is carried out by the authority concerned. The second dam, namely the Beris Dam. The catchment area for Beris Lake is approximately 120 square kilometres and has a maximum water level height during high water of 86.4 metres and a normal level of approximately 84 metres. I want to know whether this catchment area is truly guaranteed and will not be disturbed forever? Second, I also want to know in detail how many million litres of water per day are supplied by Beris Lake for drinking. In detail too, I want to know to which areas this water is supplied?

Apart from that, the sources of water supply, I also want to know: I am informed that Beris Lake supplies water outside the Sik Parliamentary constituency. I also want to know, within the Sik Parliamentary constituency, from which water sources does Sik obtain its water supply? That is all my speech and my questions to the Minister. I say thank you very much.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Kuantan.

Thank you, Mr Chairman. Item 030000, namely water supply. Mr Chairman, Honourable Minister, I want to begin by saying, "I have a dream." I have a dream, that one day we open the water from the tap and we can drink from the water in that tap. If we go to European countries this is not an unusual matter, and even in Singapore we can get that. But I am aware that this situation is still far off for our country Malaysia, given that we still have areas that do not yet have a water supply. Our water treatment plants are also not able to treat anything other than the normal treatment for turbidity and E. coli and so on. We are not yet able to filter heavy metals. Nevertheless, Mr Chairman, while we reach the level where our water treatment plants are able to clean all pollution in our raw water, our water sources. I want to hear what plans and programmes the KeTTHA ministry has to ensure that our drinking water is truly guaranteed to be safe. We are threatened, we are menaced by all kinds of pollutants from industrial effluent, which has caused water treatment plants in Selangor, for example, to be shut down several times, and also bauxite in Kuantan, where a report in the Journal of Medical Science states that there is a potential hazard of contamination to the drinking water. I also raised the issue of banned pesticides in drinking water in Cameron Highlands, which I have already given to the Honourable Minister an abstract paper, its working paper, the published paper, the abstract of the published paper. I have raised this issue in four ministries, this is the fourth ministry to which I have raised this issue. Thank you, Mr Chairman, for giving me the opportunity, because I want to hear from all four ministries, how these four ministries that test the water at the tap, that look after the plants, that look after regulation at the start, that test in the rivers and so on, the raw water test, the raw water parameters. Fourth, these ministries each seem to operate in isolation. I am concerned about this matter, who will take responsibility? Who will ensure that this pollution, this contamination, banned pesticides or heavy metals and so on do not enter our drinking water? Considering the development taking place in our country at the same time, we are still far from reaching the status where we can drink, where we can be confident to drink water from our tap water. So, what is the action in the meantime, what are the measures to ensure that even though it is below the safe level, but cumulatively, it has an effect on public health? If these banned, prohibited pesticides continue to be taken up even though below the hazardous level, there is still a long-term effect. So, I seek an explanation from the Honourable Minister. Second, Item 08100 concerning the Pahang State Water Supply Scheme. I seek an explanation from the Honourable Minister regarding the RM78.55 million allocated as a loan to the Pahang State Water Supply Scheme, for what purpose. This is because I want to know what it is going to be used for, since the state of Pahang is the state with the highest non-revenue water (NRW). We are at, we are at the level of 59.90 per cent, Mr Chairman, in our state. We are suffering very high losses. This is 23 per cent higher than the national average in terms of non-revenue water. We also have more than 8,000 kilometres of pipes that need to be replaced and keep bursting. Always the people of Pahang face situations where our water pipes burst, underground water pipes burst. So I seek the explanation of the Honourable Minister, whether that loan is to replace pipes or for what. If not, how can the ministry help the state of Pahang? Thank you.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Pasir Gudang.

Puan Hajah Normala binti Abdul SamadUMNO · BNPasir GudangEN

Thank you, Mr Chairman, for giving me the space to join this debate. I would like to touch on Item 06400 – Johor State Water Supply. As the ministry is well aware, Johor is now a state that is growing in progress along with the development of Progressive Johor brought about by the Most Honourable Datuk Menteri Besar. With RAPID and IRDA projects that are getting bigger by the day in their jurisdiction. I would like to ask the ministry, as was also known earlier, Johor has experienced water rationing problems. In my area there are water rationing problems, and ultimately this has caused anger among local residents. When it rains, water does not enter the catchment area, causing a phenomenon where it rains but the catchment area still has no water. So we do not want this to happen again. So, what are the ministry's plans within the existing budget to expedite the addition or the possibility of new areas identified for water catchment, in order to avoid the same problem recurring.

Puan Hajah Normala binti Abdul SamadUMNO · BNPasir GudangEN

Given the present population density and only the existing water catchment areas, I believe this matter will not be sufficient to meet demand over the long term. Tanjung Langsat is developing rapidly and its industrial areas are growing larger. There are factories such as steel factory here. They use raw water in very large quantities. Petronas at Rapid is the same. So, what are the Ministry's plans? I believe it is already appropriate, and time, for us to plan ahead to overcome this problem. Next, I also want to ask the Ministry, Mr Chairman, what plans or assistance there are for the people in terms of electricity supply, where, as we are well aware, our electricity bills also include GST. So, how, as a basic necessity, does the Ministry intend to discuss with the Ministry of Finance to ensure that exemptions are given on these utility bills, so that electricity is not subject to GST? In several respects too, solar energy is seen as a system that can help. So, what incentives has the Ministry provided to companies? It is understood that it is not easy, but I believe there is very advanced technology from other countries that can be brought to our country to help reduce the burden of dependence on existing electricity supply. Next, I also want to request the Ministry to study carefully each time there is a change in the system used. I thank TNB (Tenaga Nasional Berhad) in my constituency because they took the initiative to explain the position when bills change and so on, causing bills to be late and explaining why there are double charges. But we must identify problems early, inform the people so that it does not create anger, and ask whether this need is so necessary that it causes confusion among the people for a while and spends a lot of money when we have other needs to reduce the existing problems in our country. That is all, Mr Chairman, that I wish to convey. Thank you for this opportunity, and I very much hope that Johor is given due attention. I hereby support.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Stampin.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Thank you, Mr Chairman, thank you very much. I will go straight to Item 00100 – Energy Efficiency and Renewable Energy Programme, and Item 00107 – Green Technology Project. I am very interested in these items, so there are several points I wish to seek confirmation on and questions regarding these items. Number one, the increase in allocation from RM26 million in 2016 to RM32.65 million in 2017, which is an increase of RM6.5 million. Since these are new programmes, I ask the Ministry to list in detail the programmes that were carried out in 2016, the amount of allocation used for each programme, the objectives, and the conclusions on those programmes. Number two, for 2017, that is the increase of RM6.5 million to RM32.5 million, likewise, the same as above, that is, request a list in detail for every programme carried out, list the programmes that involve research and the purpose of such research. I strongly agree with this initiative in this item, considering that the current direction of the world is towards renewable energy and efficient use of electrical energy. My question number one: what initiatives does the Ministry have for implementing it and for encouraging it so that it can be achieved, promoted and assimilated into our society? Perhaps the programmes in question already have such objectives. If so, I would like to know their effectiveness based on implementation in 2016. Number two, what guidelines exist, or if there are limitations, for ordinary people like us who want to install solar panels or wind generators at their homes, where their electricity consumption is generated by such systems. Can they sell back electricity as is found in many developed countries, or can they power up, with permission, their house entirely using such methods? As far as I know, there is now a sell-back tariff, with permission, which has a limit. If this is true, then that would be an obstacle to us advancing the use of renewable energy, and again, if that is correct, an effort between ministries is needed so that amendments are made so that such regulations are not made an obstacle to the development of the use of renewable energy, with permission. What I am concerned about is that such regulations will ultimately be made a cash cow for big companies and not intended to advance or accelerate the use of renewable energy among the common people. So I hope the Ministry can provide confirmation. For everyone's information, an American private company, as raised by the Honourable Member for Parit Sulong, namely SolarCity, has launched its solar tiles recently, where the roof looks normal but can in fact generate electricity, and the surplus electricity can be stored in the wall, which is also their new product, also a type of battery. The electricity stored in this wall can also be used by Tesla cars that run on 100 percent electricity. So my next question, number three: I also understand that such technology has very wide applications, not only in terms of installation flexibility but also cost, which is a solution in rural areas where, until now, electricity supply is still awaited, especially in Sarawak, my constituency. So my question is, which programmes can contribute to addressing the shortcomings stated above. Last question, the next one may involve other ministries. So, I ask for the Ministry's explanation on the use of cars or any type of vehicle that runs on 100 percent electricity. What regulations exist and what efforts does the government make to ensure that existing regulations will not be made an obstacle to the development of such technology.

Tuan Julian Tan Kok PingDAP · PRStampinEN

I raise this issue because, for example, if we have entrepreneurs who develop vehicles that run on 100 percent electricity, or as raised by the Honourable Member for Sekijang, perhaps in terms of the size of a bicycle or motorcycle, or even the size of a car, they will face outdated existing regulations that hinder our entrepreneurs from developing this technology. This may also include 100 percent electric-powered flying machines. Mr Chairman, the development of such new technology is like a newborn baby whose growth is often stunted, not because there are no innovators or entrepreneurs, but because of outdated regulations, or regulations that exist merely to protect the interests of big companies. That is why we often see the United States having breakthroughs, with permission, in technology, because the United States Government is always willing to evolve to accommodate the use of new technology in its society. Thank you.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Kuala Selangor.

Thank you, Mr Chairman, for giving me the space and opportunity to also take part in debating P.29 – Ministry of Energy, Green Technology and Water. Mr Chairman, I want to refer to Item 09100 – Selangor Water Supply Scheme. I want to ask the Ministry, as we are well aware, that Langat 2 is expected to be operational in 2017. I want to ask the Ministry, is it true that it still cannot be operational in 2017 because there are certain constraints that the contractor companies must face? This is because of my concern, Mr Chairman, that the population density in Selangor is increasing. I have also been informed by the Kuala Selangor District Office that in the Kuala Selangor Parliamentary constituency itself, housing development, especially by giant companies, is also increasing. So, I want to ask, if Langat 2 is not completed within the stipulated time period, what would be the danger, especially for consumers or the people in the state of Selangor. Secondly, I have also been informed in the budget speech of the Honourable Menteri Besar of Selangor that there is a sum of money allocated, namely RM778 million, in an effort to overcome the delay in construction of Langat 2, which can be used as a mitigation process.

I want to ask the Honourable Minister. I was outside when it was presented or stated by several Members of Parliament just now. The Federal Government has allocated a total of RM3.65 billion to build Langat 2. So, in terms of its rationale, Mr Chairman? Why is it necessary for an allocation of RM778 million to be presented in the Selangor State Budget 2017? This is a question that must be considered, whether the government's role is to send an audit, or whether there are certain matters being attempted, whether they are truly relevant or whether they can be linked to using or wasting the people's money. So I think this is important, Mr Chairman, because the water issue is very important as it causes suffering, especially the perception of investors and also the community in this state of Selangor. I also want to ask, Mr Chairman, when Langat 2 is said to be delayed, for example. What is the impact on the economic development of the Federal Government? Could it also further hamper the economic development of the Federal Government, especially in the Klang Valley and, in addition, the branding of Malaysia's image, especially for tourists who come to Kuala Lumpur?

That is why I feel it is important, Mr Chairman, for the Ministry to help clarify, because until today concern has arisen among the people, especially in my Parliament, when water rationing has occurred and is happening in my Parliamentary constituency. Mr Chairman, lastly, Item 00107, namely the Green Technology Project. I want to ask the Honourable Minister about the government's plans, especially to create a green technology culture among the people, and even more especially the government's role in ensuring that as a country develops, environmental protection elements using this green technology can standardise and also create stability in terms of the ecosystem of society in a country. That is all, Mr Chairman. The Honourable Member for Kuala Selangor supports.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Sungai Siput.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

Thank you, Mr Chairman. I want to focus on only one item, namely Item P.29, 00100 – Energy Efficiency and Renewable Energy Programme. I think the Ministry of Energy, Green Technology and Water must accept that the strategy relying on feed-in tariff to build our capacity in TBB has failed. This is because we heard from the answer earlier this year, number 239, to the MP for Kampar that until the end of the year, 31 December last year, only 330 megawatts were obtained from TBB, whereas the total generation in Peninsular Malaysia is 21,000 megawatts. So what we currently have from TBB, from renewable energy, is only 1.6 percent of our total capacity. This means we now rely on commercial benefits for private parties to do this work. I think the government must act more seriously regarding building our capacity in TBB because this will reduce carbon dioxide emissions into the air. However, it seems we are only doing window dressing just to show the world that we have a programme but it is not effective. At the same time, we know that carbon dioxide emissions per megawatt-hour of energy generated are far higher for coal compared with gas or oil. However, the government now has a plan to increase electricity generation from coal, from eight gigawatts last year, that is 2015, to 12 gigawatts in 2020. So, we're increasing the most polluting method of electricity generation this. I think if we are serious, we can try - TNB must do it, the government must do it. We must place solar panels perhaps on all the dams used for hydro plants. This is being done in Singapore. I just saw a news article saying this last month in The Star. It says, "Singapore, the world's largest floating solar photovoltaic cell test-bed measuring one hectare is going to be launched by the Minister of Environment and Water Resources". So it says they use this at Tengeh Reservoir in Tuas. So we also have several dams that we use to generate electricity. It will be very useful. It is easy because we can transmit all the lines there. So we have solar cells there too. We can save, we can reduce expenditure and we can use that. Another initiative we can take is, we can make it compulsory for all government buildings, namely schools, hospitals, offices, to use solar on their roofs. As in France, this is made into a law, all commercial buildings, all hotels must have half of their roofs fitted with solar panels. But before we impose this on the private sector, it is better if the government itself does it on schools and in hospitals, everywhere.

Dr. Michael Jeyakumar DevarajPSM · PRSungai SiputEN

I think we are now ready to spend RM20 billion on the nuclear programme from the estimate. Why can we not spend ten percent of that cost on TBB? The government must take this and make it a government effort, and not simply privatise it, because it seems the strategy is only window dressing. It is not effective at all. So I hope the Ministry will study the government's own strategy to build capacity in TBB. Thank you, Mr Chairman.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Langkawi.

Dato’ Ir. Nawawi bin AhmadUMNO · BNLangkawiEN

Thank you, Mr Chairman. I wish to debate Item 00107, and Item 06500. Item 00107 – Green Technology Project. Last year, Langkawi was announced by the Prime Minister to become a Low Carbon Island by 2030, with its launch last year. So, of course, Langkawi will become a special project. Apart from tourism, the Low Carbon Island will also attract tourists to come to Langkawi with its pleasant air and cheerful atmosphere and so on. For this reason, I want to ask the Ministry what initiatives and projects will be carried out on Pulau Langkawi to realise the government's goal, especially that of the Honourable Prime Minister, to make Langkawi a Low Carbon Island by 2030, and what is the amount of budget allocated for next year to achieve that goal? I would be very pleased if the Ministry could make Langkawi a pilot project to make electric vehicles a success, as was stated by my colleagues earlier. This is because Pulau Langkawi is a small island with an area slightly less than Singapore. Certainly it can be used to install chargers and so on within a short distance. It will have a very good impact if all cars, taxis and so on in Langkawi are converted to electric vehicles. In a short time, it will certainly become a special attraction for tourists who come to Pulau Langkawi. Second, Item 06500 − Kedah State Water Supply, allocated RM100 million in 2017. I want to ask the Honourable Minister and the Ministry, what plans have been made by the government to ensure that the water supply on Pulau Langkawi will not be affected in the near future? This is because I have been informed that the capacity of the water supply in Langkawi has only two years left, that is in 2017 and 2018, before the supply and demand graphs meet in 2018. We are worried that this situation will cause the tourism and hotel development in Langkawi to be stunted due to insufficient water supply.

Dato’ Ir. Nawawi bin AhmadUMNO · BNLangkawiEN

For this reason, as I have been informed, there are plans to increase the amount of water supply to Pulau Langkawi. However, I humbly request that the Ministry and the Honourable Minister provide a correct and prompt final decision, because this project will certainly take a long time to lay a submarine water pipe from Kuala Perlis to Pulau Langkawi. Currently we have one large water pipe of 50 MLD, that is 50 million litres a day, and the government may possibly add another water pipe. However, this project must be given urgent emphasis because I am worried, as a people's representative on this island, that we will face a shortage of water supply, which will cause many tourists to run away from coming to Pulau Langkawi.

Dato’ Ir. Nawawi bin AhmadUMNO · BNLangkawiEN

The goal of LADA (Langkawi Development Authority), that is our government's goal, is to increase tourist arrivals in Langkawi from 3.6 million today to five million in the next few years. Therefore, basic necessities such as water and electricity supply are very much needed and must be given high attention. Thank you.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Sandakan. After the Honourable Member for Sandakan, the Honourable Member for Lipis, and after that the Honourable Minister may reply.

Thank you, Mr Chairman. Regarding Head P.29, Item 03200 on SESB, which is allocated RM245 million and a loan of RM82 million. Mr Chairman, I think Sandakan has also grown tired of repeatedly raising the problem of electricity disruptions in Sandakan, but each time we raise it, we do not see any improvement. Although the Honourable Minister mentioned that SAIDI has increased, I think these statistics are meaningless if the electricity supply is constantly interrupted. The people of Sandakan have already faced such a situation for more than 10 years, yet until now the situation does not seem to have improved. Mr Chairman, according to the reply from the Honourable Minister last year, the Honourable said that before September this year, 30 megawatts would be sent to Lahad Datu, and there would also be two sets of 30-30 expected to operate in open cycle first, to be temporarily used by Sandakan and East Coast. However, here I do not know how this is? Has it been installed? If so, why is there still no improvement in the situation? Mr Chairman, the Honourable Minister also made a promise that the Economic Council would decide to build a base station at East Coast powered by gas. I do not know whether this has been fulfilled? However, I heard in the speech of Honourable Pekan that a plant would be built in Sandakan, but I do not know when this can be fulfilled. So perhaps the Honourable Minister can give a slightly more detailed explanation. Please note, is it 103 megawatts that will be built in Sandakan or where is the additional capacity for East Coast? When will it be launched, and when will this plant be completed? This is important because the people of Sandakan are already extremely hard-pressed. So there is one more thing, Mr Chairman, I want to ask, I hope the Honourable Minister has an answer regarding the capital contribution. The capital contribution in Sabah and in Peninsular Malaysia differs greatly. I also raised this in the previous Parliament and the Honourable Minister said that this capital contribution would be reduced within two months. Because, now in Sabah, the contribution to pay SESB for developers in Sabah, in Sabah it is RM3,300 to RM8,000 per house, but in Peninsular Malaysia the contribution is only RM250 to RM2,000. So, I hope the Honourable Minister can give an answer after this. One more thing about this theft: we learn that this year, SESB has already lost RM64 million. So I hope the Honourable Minister will take a step to eliminate this theft. Otherwise, it is very, very unfair. Whatever has been stolen, used by this PTI or whoever the thief is, but what the thief has stolen should have been used for the people of Sabah or Sandakan or anywhere, not used, but the thief uses everything that should be for us in Sabah. So Mr Chairman, I thank you for giving me the opportunity. Thank you.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, Honourable Lipis.

Thank you to Mr Chairman for allowing me to debate the Appropriation Bill 2017 at the Committee stage under the Ministry of Energy, Green Technology and Water. I go to Item 020100 – Pahang to Selangor Raw Water Transfer Project Team. I actually wish to record congratulations to the Pahang State Government for not choosing to supply water to states such as Selangor, the Federal Territory of Kuala Lumpur and Putrajaya. This means that the state of Pahang did not choose to supply this water. I am very confident that the Federal Government will not marginalise the Pahang State Government, which has already sacrificed much in this matter. I think it is fitting: "The monkey in the forest is nursed, while the child at home is neglected." Under the study of the National Hydraulic Research Institute of Malaysia or NAHRIM, Selangor is in a very dangerous position because it will face the worst water shortage after this if this problem is not resolved.

I relate this in this matter...

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Honourable Kota Tinggi stands.

Honourable Lipis, can it be just 30 seconds?

Sekejap, sekejap.

Thank you, Mr Chairman, thank you Honourable Lipis. I, regarding the water to Selangor just now and Item 09100. I want to ask the Honourable Minister, during the water acquisition of SYABAS, Puncak Niaga and the ABASS Consortium, the Federal Government through PAAB has given a 100 per cent loan to the Selangor State Government to pay for shares in those three companies. So my question, perhaps Honourable Lipis can extend it, is that when we hear that the Selangor State Government wants to pay RM2.9 billion or RM2.7 billion to SPLASH, does the Federal Government plan to finance a 100 per cent loan to the Selangor State Government to pay SPLASH? Thank you.

Thank you to Honourable Kota Tinggi. I think that should be answered by the Honourable Minister and partly included in my speech. I want to ask the ministry, what is the root problem of raw water in the state of Pahang? Is it due to the continuing matters arising from this Selangor water supply? Is the Sementa River polluted? And as the answer from the PAIP management of the Pahang state, it says no. But I want to get confirmation from the Honourable Minister's side. I want to go to Item 08100 – Pahang Water Supply Scheme, whose allocation is RM78.5 million.

I am of the view that such a budget will not be able to solve the problems of the whole state of Pahang, although I record my thanks, at least it can. Because I say so, my concern only involves the calculation from the Pahang State Water Corporation, Lipis District. The Lipis district mukim includes a small part of Cameron Highlands, one DUN. This means that we have already reached more than RM200 million for repairs. Here it means the total distribution is across 11 districts or 14 Parliamentary constituencies. Perhaps Kuala Krau also has water problems, Jerantut has water problems...

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)

Ya.

...Raub also has water problems.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Honourable Lipis, can you propose to the Federal Government to write off the Pahang State Government's debt on water supply?

Yes, I was actually about to get to that point. I ask that the ministry write off the debt that the Pahang State Government has, and this is one of the...

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

On the goodwill and agreement to sell water to Selangor state.

Yes Mr Chairman, include it in my speech, that is Mr Chairman's speech. Because of this, we have sacrificed a great deal...

Dato’ Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Kedah should also have its debt written off, for selling water to Perlis.

The Federal Government really must consider this matter because we have helped a great deal in that regard. So, if Pahang had not sacrificed, then the three states I mentioned just now could be affected very seriously. I also want to mention the matter of- because of the very short time given, 5 minutes, with 26 seconds remaining. I want to ask about the Jelai Hydroelectric Project, Cameron Highlands. This is one of the causes of the water problem in Lipis, where three rivers from the Jelai River, starting with the Telung River, Lemoi River, and Bertang River, which were channelled to the Cameron Highlands hydroelectric plant, causing the Lipis water to recede so that water cannot be supplied to Lipis. So, because of the very stingy time allotted to us, 5 minutes, we cannot debate any longer, so thank you to Mr Speaker.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, I invite the Honourable Minister to begin the reply. Many issues for the Honourable Minister, 21 persons.

Datuk Seri Panglima Dr. Maximus Johnity OngkiliPBS · BNMinister of Energy, Green Technology and Water · Kota MaruduEN

Thank you, Mr Chairman. Greetings of respect to everyone on behalf of the ministry to the Honourable Members who have taken part in the debate at the Committee stage for Head P.29, and B.29. As Mr Chairman has also recorded, there were 21 persons, all of the Honourable Members who took part in the debate at the Committee stage. Providing explanations or questions regarding matters under the jurisdiction of this ministry, namely concerning energy, green technology, and water supply as well as sewerage. I see that if I were to answer everything, I think it would exceed one hour. So, I ask Mr Chairman, so I will take the- because, some of the points are repetitive, overlapping with others. So, perhaps it is best that I take the main points and for those that cannot be answered for the other Honourable Members, I will provide them in writing or give a briefing at the ministry on the detailed matters, especially those requiring data. All right, Honourable Member for Parit Buntar began by raising several matters, especially the status of the green technology financing scheme. For the information of the Honourable Member, as said, from 2010 until 2016 this year, the programme we call green technology financing or the green technology financing scheme has actually received very tremendous response. In total, RM2.83 billion out of the RM3.5 billion allocated has been used. Until- this is for companies that wish to invest in the green technology sector. What they need to do is obtain a green certificate. With that, they can obtain loans from banks that have been designated and there they can get a discount or interest of around 2 per cent from there.

Datuk Seri Panglima Dr. Maximus Johnity OngkiliPBS · BNMinister of Energy, Green Technology and Water · Kota MaruduEN

So far, 534 applications have been given green certification, and of these, 249 projects have obtained financing from financial institutions totalling RM2.83 billion. If we follow the energy sector, 199 projects, RM2.32 billion. Waste and water - RM442 million. Buildings, three projects - RM14.6 million and transport, five projects, namely RM40.2 million. To some extent, this programme has actually helped to encourage the private sector to get involved in the green technology sector. Although, a little bit biased, with permission, towards the energy sector by- it relates to renewable energy, namely in the biomass sector, in the biogas sector, in the solar sector, in the mini or micro hydro sector. Initially, take-up in the GTFS was very weak, but in the early years, these recent years, it has become an attraction for companies to obtain these facilities. Next, regarding green incentives, incentive green invest, for example the incentive green investment tax allowance (GITA), income tax exemption (ITE) which were announced by the Prime Minister since the Budget 2014 speech, aimed at encouraging SMEs in the use and production of green products and services. So, this is always available and that is basically the overall picture. Just now, I think I went off track directly to the Honourable Member who said that it is just window dressing regarding the government's actions in relation to its role in advancing the green technology sector. I say that there is no Honourable Member for Sungai Siput, yes, who raised this matter about the FIT and said just now that it had not succeeded. Actually, for the overall total, around 100 megawatts from all those sectors have been approved under the FIT scheme. Yes, it is true, only at this moment those that have reached COD have successfully injected about 310 megawatts into the grid. However, overall, the issue here is that the interest was so high, to the point that we cannot finance all the applications that have been applied for. Starting next year, it seems likely that we will not offer FIT for solar PV anymore and that is why we open it for open bidding. Name your price and a total of RM200 per year for solar PV for open bidding, 50 in Sabah, so 250. Next four years 1,000 megawatts without using any subsidy money from the feed-in-tariff. This reflects the successes of this programme.

Datuk Seri Panglima Dr. Maximus Johnity OngkiliPBS · BNMinister of Energy, Green Technology and Water · Kota MaruduEN

Indeed, as touched on by the Honourable Member for Sekijang just now, where he said we should encourage renewable energy so that all parties are involved in installing it at home and so on. That is accurate to the situation and for the information of the Honourable Member for Sekijang, starting next year we have decided to have net metering of 100 megawatts a year for savings in the coming year. Net metering means where it is open to install solar PV on the roof of houses, on factories and used for oneself and the surplus you sell to TNB or SESB. At this moment there is no obstacle for anyone, as long as it is in low kilowatt form for oneself to install at home or on the farm, subject to the total kilowatts available. So, these are among the initiatives to encourage the public to get involved in renewable energy generation without using subsidy finance such as FIT. The FIT every year, we only collect 1.6 per cent every month from our electricity bills for those who exceed 300 kilowatt hours. So, it does not involve low-income people and we see that if initially the Renewable Energy Act was formed with the intention of two per cent, but at this moment, with the cost of living situation and so on, we think that is reasonable. At this moment, to provide encouragement and we must move out of the FIT bond and eventually move towards a situation where it is open to all parties, except perhaps next year and two years later for biogas and biomass. This is because biogas, investment in this sector, especially in agriculture, is not yet sufficient. Where at this moment POME, or gas output from the mills, of around 200 palm oil mills in our country.

Datuk Seri Panglima Dr. Maximus Johnity OngkiliPBS · BNMinister of Energy, Green Technology and Water · Kota MaruduEN

Mainly- which is more than 33 per cent, 33 times more polluting than CO2 and that is still open for biogas application to be used for energy generation or other products. That is all for the Honourable Member for Parit 'Bunting' and I also answer together with the others.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Honourable Parit Buntar.

'Puntar' or 'Buntar', 'Bunting'?

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)

Buntar.

Buntar, lah. That is Pulau Bunting. Oh! Is that different? Pulau Bunting in Kedah. An island that cannot bear young [Laughter] Okay. Next, Honourable Member for Putatan- a Sabahan, I am well aware of what has been touched on and repeatedly touched on. The same goes for the Honourable Member for Sandakan and the Honourable Member for Kota Kinabalu, namely regarding matters of energy generation and concerning SESB in the state of Sabah. As well as matters related to water supply. First, I want to touch on water supply in our country, only in Peninsular Malaysia and to Labuan, it is under Act 655 or WSIA. This also depends on whether they have migrated to this Act or not yet, and there are still four states that have not. Sabah and Sarawak do not subscribe to this Act. Therefore, they have their own regulations and also legislation at the state level in Sabah and Sarawak. So, Federal Government, with permission, has no power at all in respect of the supplier of water and management of water in both states. Nevertheless, Honourable Members, the Federal Government continues to help from the aspect of the policy determined by the state. From the aspect of implementation, the state carries it out. So, when they ask the Federal for help, it is mostly 80 per cent in the form of grants or loans. A loan form for water development. A little in the form of grants. So, in terms of management of all that, whatever happens to the water department is a state matter. It has nothing to do with us. They apply for money for development, we check through the EPU whether there is a basis or not, we give a loan. However, the cabinet has decided recently that with the case in Sabah, it is not enough to simply- when they apply, we check all their specifications and budget and just release the money. It remains until the time comes, the Federal says that the use of that money must be monitored as thoroughly as possible so that disbursement of money should be subject to KPIs and so on. Okay. Honourable Member for Putatan.

So, there is no connection with the water department, then...

Yes. Honourable Minister. I agree, Honourable Minister. No need to answer about solar, Honourable Minister, because that is a matter within state government jurisdiction. It has nothing to do with this august House. That was deliberately done by the Honourable Member for Kota Kinabalu. Provocative. So, I support the Honourable Minister. Honourable Minister, I think my constituents are listening to our debate, the people of Sabah. So, I ask for a little assurance from the Honourable Minister. How many biomass plants and existence of IPPs are there in the state of Sabah? So, the people want to know whether there is a sincere plan by the Federal Government to really address the frequent electricity disruptions in Sabah. If the Honourable Minister could give how many IPPs are being listed, and when can they be completed?

Also raised by the Honourable Member for Sandakan and so on. I want to touch on SAIDI first. This Honourable Member is not Batu Sumpah. So it is good to sit down first, Honourable Member... [The House laughs] That can be answered later by the other Honourable Minister.

In terms of SAIDI, actually the situation in the state of Sabah is with the assistance of the Federal Government. I mean strictly, if it is true, Sabah and Sarawak, except Sabah, Sarawak operates under delegated power. It is not under the Federal Government. Maybe the Minister gave them power 20 years ago to run their own electric affairs, but we follow the standards. Sabah with SESB, so it is under the Federation, Akta Bekalan Elektrik Federal. If we look carefully at these three years, starting with the former Honourable Minister Peter Chin, at the time on stage he said he would resign if SAIDI did not touch 700, because at that time, with permission, incidentally, SAIDI was 1,200 minutes, per consumer. So, the Federal Government, although SESB is owned by TNB, it is not owned by the government, and SESB is 20 percent state, still the Federal Government, especially when I came in, you know. We got 2.3 billion to help that SESB. Of course, rural areas are under the Ministry of Rural and Regional Development, but in urban areas it should be under the utility. If TNB in the Peninsula, it has no assistance whatsoever as grants. None. Only in Sabah is this special, Honourable Member for Kota Kinabalu. So, we must learn to be thankful, we are doing everything. When I came in, SAIDI was still 450, and today our target this year is 250, with a little help from 'heaven', you know, hopefully we can, because sometimes suddenly there is a major problem or tripping. Actually I can show you, SAIDI in the United States is 240, Australia is 260, and the Peninsula, of course, 60 for the Peninsula. Putrajaya almost zero, Singapore three minutes per consumer. So, wait a moment. We have done a lot. However, as before, the problem in the state of Sabah, Mr Chairman, is that there has been no tariff increase for 22 years.

So, the wire too is mostly 70 percent bare wire, there is no 'celana' wire, bare. Not the ABC aerial bundled wire. This is among the costing items- this SAIDI distribution level. We want to calculate SAIDI, we want to calculate whether one generation is enough or not. Two, transmission- penghantaran, exporting the power. Third is the distribution level, which is high at this moment in terms of SAIDI. However, for Kota Kinabalu, for example, it is okay. Kota Kinabalu up to this month, September, is 164 so far, on an annualised basis it should be 209. If nothing major happens and so on. The Honourable Member for Sandakan last year was 407; our prediction this year should be below 400. So far it is 300, and by October it is 330. So, for the other years, if the investment given by the Federal Government begins to show, first, adding capacity; second, improving and monitoring transmission; and third, changing connectors, installing new, new PMs and so on. I am quite confident to the Honourable Members here that within the next 12 months in particular, the impact of the RM2.3 billion given by the Federal Government as grants to the state of Sabah will be felt. However, we know there are still sectors that are still experiencing disruptions. Tawau, for example, has decreased so far, in October, to 149, last year 615 minutes. However, even though it has decreased, when I went down to the ground three weeks ago, the number of incidents occurring has gone up, up; the total minutes decreased, but perhaps within 10 minutes, three times. So, it makes people angry. So we have instructed SESB, and they have a new programme, a special one for the Honourable Members of the state of Sabah- the 150 SAIDI project for next year.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Two who stood up, the Honourable Member for Kudat and the Honourable Member for Sandakan.

[Bangun]

The 150 SAIDI project, and TNB is sending 60 of its engineers to Sabah, specifically to all areas, to help our SESB engineers. Change all connectors, change the bare wire, and the impact should be visible, with permission, within the next six to ten months.

Thank you, the Honourable Minister concerned..

Eh, why does this look like P. Ramlee... [The Honourable Member for Kudat puts on black sunglasses] Too bright...

[Dewan Ketawa]

Shah Rukh Khan.

Thank you, the Honourable Minister, and the Honourable Member for Kota Marudu too. I was interested in what was said regarding SAIDI, but in relation to this SAIDI too, there is one problem that always occurs, occasionally occurs in the state of Sabah, but it also affects consumers, namely power surges. Power surges have caused many problems for consumers, and I myself have experienced power surges twice, and this caused a lot of damage to electrical and electronic goods, televisions, refrigerators and many other equipment. When we make claims to SESB, up to today there has been no action and nothing they can provide, even though the losses amount to thousands of Ringgit. So if someone like me cannot get anything, what more others, right. So I think this matter needs to be purified again. Regarding the matter of consumers' rights, because if there is no action from SESB, this will also become a major problem and issue. Thank you.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, I want to get certainty. The Honourable Member for Kudat, because of health, wearing that kind of thing.

Health, Mr Chairman.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Because I worry it will become a fashion in the House...

[Dewan Ketawa]

Okay, thank you, the Honourable Member for Kudat. All of us are aware of this, and that is the responsibility of the Ministry and the Energy Commission. We have discussed with SESB that although SAIDI has decreased, for example in Tawau, the incidents of disruption have increased, for example shock duration, with permission, and power surges can happen every 10 minutes, three times it happens, and complaints are indeed constantly received.

[Bangun]

There are processes that are determined on how compensation can be applied for, but I myself am aware that the process is not easy either. We have to prove that because of the disruption- we have to make a police report, because with that, if the Honourable Member for Putatan's wind cooler is damaged, he says [Laughter] So it must be proven that it was exactly at that minute and hour, only then can it be considered. So the process is indeed very complicated, we are examining it - otherwise there is progression in the Act for purposes like this, but we acknowledge the process is very difficult for ordinary people. If it is a factory it is easy because it is large, its usage at certain hours must be recorded. But at home, maybe it is under 300 kilowatt hours, and to say my rice cooker was damaged, it is very difficult to provide proof. We need to refine it. The Honourable Member for Kota Kinabalu, that is enough, later Batu Sumpah is a different matter.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

This is not Batu Sumpah. This is the electricity base. Okay, thank you, Mr Chairman. Thank you, Minister. Okay, perhaps as I feel, this SAIDI in the hands of the new Minister is somewhat better. However, what really matters is that Kota Kinabalu has many disruptions, perhaps there should be action. So I hope- these 60 engineers should resolve this SAIDI so that it goes down below 100.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

The capital, if electricity disruptions- this really embarrasses us. So I hope that in line with- Kuala Lumpur, down to below 100, during the Minister's time before we finish our Minister [Laughter] Second, I want to ask about the status of this geothermal in Tawau because recently, not long ago, the Minister had one [Laughter] Answer..

It is in the answer.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

And also the liquid fire gas station in Lahad Datu, several years ago already. Okay, its status.

Okay, for the information of the Honourable Member from Kota Kinabalu who is really interested in Tawau too- is he going to move constituency in the future, afraid already ah? Wants to go to Tawau...

[Dewan Ketawa]

He is a Tawau person, has he been there before..

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

A Sabahan. Anywhere.

His activist went to [Laughter] [Interjection] He went earlier on a hunger strike, didn't eat for one week, ah, but after that, that day he just ate and ate [Laughter]

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

That is not right, he went one week without food and then there was electricity. Every day the lights go out...

[Dewan Ketawa]

Only two and a half days after he was counted, he immediately fell ill and was admitted to hospital. Okay, one matter related to that is the dam in Tawau, water, and at the same time related to the matter that the Honourable Member has touched upon. This project was originally applied for as a water supply project.

After that, the state government applied for additional allocation to make it a flood mitigation project too. Okay. So this is the problem, sometimes the state has submitted the application, the EPU (Economic Planning Unit) has approved it based on the specs that follow. After that, it is not only Sabah, other states are also like that. After that, they said they want to add allocation because they want flood mitigation, add RM200 million. Okay. Want to go back to engineering, want to go to value management again and certain processes. So I can only say, that is the reason. After that, we added RM220 million, they said GST again. Want to ask for exemption from GST or add allocation to cover GST, with permission. So, with that. It is in the final stage of value management. Twice back to value engineering, twice back to value management. So don't be angry.

Tuan Wong Sze Phin @ JimmyDAP · PRKota Kinabalu

[Bangun]

The Honourable Member from Tawau, my anger. This is among the states that often do this unfortunately. So I am quite confident we can finish it as soon as possible so that the tender, this loan is not from the Federal Government, it is not provided by the Federal Government but the state will call the tender later. Later you, the Honourable Member can ask in the State Legislative Assembly about this matter. Okay. That is enough. [Mr Speaker (Datuk Seri Dr. Ronald Kiandee) presiding

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Hello! Honourable Minister. Sorry.

What Hello! Hello?

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Honourable Minister, this is the Water Department under the President of PPS, you know. Our President. So what is the problem? You want to replace him in the future? So if because of this addition, flood mitigation two years. Add GST again, two years. What is this? What game? Are we playing kuntau? So I do not want kuntau, kuntau...

[Dewan riuh]

The process that must be followed, lah. Aiyah.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Just give the RM200 million flood mitigation to finish the water first. Finish the water first. No more GST, no more mitigation. Finish the water first, yes. No more playing kuntau over there.

Only two times- that too is wrong.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Don't say any more. Don't talk so much any more.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Finish it. It has been 30 years. Why are the promises not kept? Aiyaa. Good if ....

No. We do keep promises. Only the legislative process, you know, must follow the legislative process.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

How long does the process take? GST told the Prime Minister...

Cukup, cukup.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat.

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

If GST does not pay, direct the Honourable Minister to pay, okay?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kota Kinabalu.

...With GST, okay?

Tuan Wong Sze Phin @ JimmyDAP · PRKota KinabaluEN

Slow, this is slow.

Okay. So it's alright. Regarding the geothermal, this is a private project, it receives support from the feed-in tariff. They have finished drilling, now drilling for the production well. Okay? We have annouced to the world that based on the research conducted, Malaysia will become number 17 in the world with geothermal- 37 megawatts has been approved. We hope that within the period when the production well drilling is completed, eventually the plant can be set up. So no waste of money. It is not a government project. This is a private project but it gets assistance through the feed-in tariff in terms of its tariff. That's all. Okay, I think that is enough on Sabah matters because much of what is related has already been touched upon.

Tuan Pengerusi.

The Honourable Member for Putatan has been touched upon.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Ya.

Honourable Minister, Sabah still has many more.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Want to give way, Honourable Member?

Enough, enough. That's enough, that's enough.

No, no, no. There is one matter that is very important.

What is it- the capital contribution?

Yes. That contribution which the Honourable Minister promised two months ago. So there must be an answer given to us. How much has been reduced?

Okay, actually our Ministry has already discussed it. I have instructed SESB to examine this matter. One thing we cannot compare, we cannot compare with the capital contribution in the Peninsula because in the Peninsula, when the capital contribution issue arises, it has already been included in the development cost within the zone by TNB. So although it is low, actually people are paying for it through the process when the town planning was first done, okay? But in Sabah, because when we begin to explore an area, and your factory is the only one there, the Honourable Member's factory, the only one there, no one else, that is where the issue lies. You have to bear the full cost because there is no one else next to you who is there. So I have discussed, I have instructed the Energy Commission so that a reasonable tariff or a reasonable formula can be formulated. Unfortunately, when the first proposal was made, the Sabah State Housing Association said it was not yet satisfactory, and that is why it is still under review by the project party once again. I hope that in the near term, early next year, we can inform you. In the meantime, we have told them, SESB, not to impose the existing formula they use, which sometimes makes 200 into 2,000, for one hotel room. So we are updating these proposals. I will try to call back the Sabah State Housing Association to negotiate on this matter. Okay, that is enough.

Yes, one more, Mr Chairman. Honourable Minister, earlier I asked about a plant that was mentioned by the Most Honourable Member for Pekan, who said there are 1,300 megawatts. Where is the location? When will it be launched and when will it be completed?

Okay. That is in the list here. For the information of the Honourable Members, this is a 1,300 megawatt plant to replace first the proposed plant based on coal, which was opposed by many people. After that, the proposal was to place the plant in Tawau, okay, using liquefied petroleum. So when we studied that, the cost for RGT, you know, was very expensive, and the only one who would benefit later from Kimanis would be the ships that transport the liquefied petroleum gas. So the latest decision made by the Energy and Economic Council and agreed by the state government two years ago is that the plant should be built at POIC in Sandakan. We take the gas from Tuaran all the way to Sandakan. This will help towns such as Tuaran, Kota Belud, such as Kota Marudu. Maybe we can tap the gas, pass through Pitas, go straight to Beluran and draw directly to POIC. Then later, only then draw the pipeline towards Lahad Datu and Sandakan. We believe this is an investment. Later a special announcement will be made by the Federal Government on this matter, the pipeline has already been signed in Beijing ten days ago. So the beginning is next year, that plant, and it is expected to be completed in 2019. Okay. Our hope is that the gas from the gas pipeline from Tuaran is not delayed in terms of land acquisition and so on. So this will become a base plant for Sandakan, and because at this moment we import 220 megawatts from Kimanis through the 275 kV transmission. So what is expected is that within that three-year period, demand will increase to around 350 megawatts. So we will monitor this together, and from Sandakan, then improve the transmission, draw it to Lahad Datu and finally draw it to Tawau. Okay.

So later there will be- altogether the cost is in the billions. Details are being worked out later. Okay, that is enough. The Honourable Member for Seputeh has something there.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I want to touch on just a little. Earlier the Honourable Minister said that the Sabah Water Supply Department is under the state government.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

So, the two directors who were investigated by the Malaysian Anti-Corruption Commission (SPRM), are they Federal officers, or are their salaries paid by the state government?

State officers.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

State officers? But I read that for next year, the ministry is giving a loan of RM132 million to that department.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

But cash, gold, handbags, everything was found in that house, RM114 million. So will the ministry also investigate…

Part of that, his wife bought with her own savings, you know? So, don't simply attack. Leave it to the investigating authorities lah, don't raise it because this is under prosecution. Okay? Last, not last, but I want to touch on four Honourable Members who raised matters about the water supply in Selangor, especially the Honourable Member for Bandar Tun Razak, who did not finish his task because Pakatan threw him out too. If he were still there, things would be a bit easier [Laughter]. Okay, as the Honourable Member already knows, in our master agreement the takeover is RM9.65 billion, but that is indeed subject to the evaluation review of four concessionaires. At that time it was settled except for SPLASH, okay? Except for SPLASH. When the Honourable Member for Bandar Tun Razak was Menteri Besar, the state government proposed and offered to SPLASH, even though before that they had also offered billions, up to RM1.8 billion even. But in the final offer given, the state government gave only RM250 million. So, that is why, in finalising the agreement and restructuring for the other three entities, SPLASH has been removed. True, the master agreement at RM9.65 billion, because RM250 million only, this SPLASH. The principle from the beginning is willing buyer, willing seller. The Federal is not directly involved in the negotiations.

Wait, wait. Just a moment, Honourable Member. Is the Honourable Member from the Federal Territories? Not Selangor? The Federal Government is not directly involved in discussing the value. This is among "willing buyer willing seller". When you have decided, discuss with that entity or concessionaire and agree, and then you come to us at the Federal under Akta 655, which I control through SPAN, then we look at the restructuring, then we see how much the Federal can bear, how much it can help through the asset, like what has been done in six other states. When PAAB then takes over the asset, if you give the asset to PAAB, PAAB takes over all your loans, and after that PAAB gives it back to the state operator to list, because then its burden is lighter, especially if there are private bank interest rates. So, that is the approach. As far as finalising the matter of SPLASH, we on the Federal side are waiting for the determination of the value agreed between these two parties.

But, in the estimate made by Rashid Hussain International Bank, it says the pricing should be between RM2.4 billion and RM3.2 billion, based on, for example, I have here the Audited Account of SPLASH 2016 and Audited Accounts of Gamuda 2015... [Showing relevant document] This is as a guide at the Federal level. Given much dispute, so according to this, between RM3 billion. This is an international listed company and its pricing is open to the public. Of course the Honourable former MB says they are only worth RM250 million plus maybe receivables of another RM1.8 million lah, like that. Because that letter, the Honourable Member's own letter, I also received from friends. So, from the Federal side, we are waiting because we are not involved in the pricing agreement. However, in order to defend that value so that the Federal can accept it, the Cabinet has appointed an international valuer again to check, to go through whether Rashid Hussain's estimation is accurate, acceptable or not. As long as that is not finished, the restructuring process continues, and only then will the Federal Government determine how much we can help in terms of loans, in terms of PAAB as done before. So, another matter that was touched on earlier was that the tariff is high, if... Indeed the SPAN side is our regulator. I wish to inform this august House that determining tariffs is not the Federal's role. Tariffs are determined by the operators at state level, and these operators are almost all state government companies. They will determine the tariff, then they come to us, SPAN, for us to evaluate whether your tariff is reasonable or not, whether the return exceeds or does not exceed. So, the Centre is not involved in determining how much the tariff is. That is for the state, based on the business plan made by the state government according to their capability. So, this is the problem in other states like Pahang, they do not want to migrate. I answered the Pahang side earlier. They do not want to migrate to WSIA, Akta 655, because the tariff there has not been revised in 22 years. Indeed there are many loans, many loans, because they do not want to migrate. They say, take my loans first, then I will migrate. Usually you migrate bringing the loans together, and then the Centre says which can be included and which cannot. The Honourable Member for PJ Utara.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Ampang.

The Honourable Member for Ampang.

Ampang. Thank you, Mr Chairman, thank you, Honourable Minister. I just want to seek clarification from the Minister, because earlier several Honourable Members over there raised points that I feel are not accurate and not true, including the Honourable Member for Bandar Tun Razak, yes. So, what was said earlier, as far as I know, is that the restructuring agreement has not yet ended. Only, at the Federal Government level, they are still asking for a six-month extension to carry out an independent valuation, whereas the Selangor State Government already began an independent evaluation last year. I also want to stress here that if the price mentioned, RM9.65 billion, is based on the RM250 million said by the Honourable Member for Bandar Tun Razak, and asked the Menteri Besar, the Honourable Member for Gombak, to give an explanation, but did not go to the Selangor State Legislative Assembly to seek an explanation and bring this issue here, I was also informed that in June 2009, the Honourable Member for Bandar Tun Razak wrote a letter offering SPLASH RM2.97 billion at that time. So, because there is a difference in price and so on, it is impossible for us to get the approximate answer given by the Minister in the written reply, RM9.65 billion. I also want to ask the Honourable Minister about what some Members earlier said, that water in Selangor is not sufficient and so on, and asked for loans and so on. Other states are also the same, not only Selangor.

So, those who did not sign the WSIA may not get this facility, but those who signed the WSIA get this facility. With that, I also want to ask the Honourable Minister, is it true what was said by, if I am not mistaken, the Honourable Member for Kota Tinggi or the Honourable Member for Kuala Selangor, that the grant loan of RM3 billion from the Federal Government must be audited because the state government has allocated RM800 million? The RM800 million is for the mitigation plan for Semenyih 2 and Labuhan Dagang. What was given or taken from the Federal is for Langat 2. These are two different matters. So, do not bring wrong information into this House if we do not know the actual facts. So I ask the Honourable Minister to confirm what I have said so that it is not spread around and false things are not fabricated about the Selangor State Government. This is the work of Barisan Nasional...

[Dewan riuh]

Okay, the Honourable Member for Ampang.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai Besar

Boleh?

It seems the Honourable Member for Ampang is defending…

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

Honourable Minister, can you add a little?

Menteri.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai Besar

Menteri, Menteri.

Wait, wait, wait.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

Honourable Minister, Sungai Besar, can you add a little? Just a little.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Want to give way, Honourable Minister?

What was touched on earlier was indeed in terms of the Dagang dam being internal to Selangor, okay. The matter of Langat is included in that agreement, the master agreement. So, indeed the maximum under that agreement is 9.65. But that is based on the state government's evaluation at that time that only 250 for equity to SPLASH. I will give the opportunity to the Honourable Member for Bandar Tun Razak.

Honourable Minister, Mr Chairman, I only want to correct what was stated in my letter dated 2.6.2009. The Honourable Minister knows there were four offers made: the first offer, the second offer, the third offer. The first offer was rejected. The second offer, two people agreed, two people rejected, and PAAB said everything must be rejected. That is how this negotiation was, and the value I put forward was based on the negotiations at that time. Finally, at the fourth offer, then we wrote down all those offers. Do not use the rejected offers to say they can be applied, because they cannot. Who taught such a way of negotiating?...

[Dewan riuh]

No, I said the Honourable Minister also knows, it cannot. Okay, but I request the Honourable Member, because the people of Selangor, including the Honourable Member from Ampang, always ask that the price of water not be raised because it helps the people. So, if we let it be raised and do not protest and give reasons why it cannot be raised, that means we are not doing our duty. So, there is no need to fight for the interests of the people, rather let the corporate sector gain more profit.

Okay, that's enough, next month I'll pass the responsibility on to you too...

Okey, baiklah.

Okay, I ask for a bit of clarification.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, want to give way again, Honourable Member?

I have one more, after that I will stop.

I want to ask the Minister, yes.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Just a moment, just a moment, the Honourable Member for Bandar Tun Razak has not finished yet, Honourable Member. He has not finished yet, Honourable Member.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

Honourable Minister, Honourable Minister. Honourable Member for Sungai Besar, give the Honourable Member for Sungai Besar one chance as well.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

One at a time, one at a time, Honourable Members.

The Honourable Member for Sungai Besar.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, the Honourable Member for Sungai Besar.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

I am puzzled why the Honourable Member for Ampang does not allow this issue to be raised in this House. Because when we argued, what did we start with? The details we put forward at the early stage, whether by me, the Honourable Member for Bandar Tun Razak, or the Honourable Member for Kuala Selangor just now, were the matter of Item 11200 – Inter-State Water Transfer; Item 09100 – Selangor State Water Supply Plan. That means there is no reason why we cannot bring this issue into this august House. [Applause] That is the first. Second, I am also puzzled, Honourable Member for Ampang, if you want to defend your boss you must think twice. There are four people in this House of the same kind: the Honourable Member for Sungai Besar, the Honourable Member for Bandar Tun Razak, the Honourable Member for Permatang Pauh and also the Honourable Member for Gombak. If he is here, it means he is somewhere else. If he is not here, it means he is somewhere else. That is what it means. Anyway, I want the Honourable Minister, I ask for clarification. My mathematics, I just want to ask the simplest thing. First you said agreed to RM9.65 billion, then it is said that now you agree to an additional RM2.7 billion. So, RM12.35 billion. The question is, who is going to finance this RM12.35 billion? Is it entirely the Federal Government, or the state government, or who? I ask for a clear explanation on that.

Okay, as I touched on earlier, willing buyer, willing seller between Selangor and the entities. So, in the end it is the Selangor Government that pays the full payment, because it wants to take over the company. Only after that does it come to the Federal under the Act to ask for help with the loan matter. That is where, in the end, we will decide how much loan can be granted through PAM, because that is for them to finance. They hand over the land at whatever value was agreed, and we will decide whether it is 100 percent or so. But in the end, it is the state that takes over.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

Yes, on the matter of willing seller, willing buyer, we agree. That means this is a good business. First willing seller, willing buyer, child with child, then they meet the Federal Government and ask the father instead.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

So, where does this additional amount come from? Is it entirely, or what percentage, will the state government ultimately bear and the Federal Government bear? Because I want to say one simple thing: if the Federal Government ultimately gives the loan...

The Honourable Member for Sungai Besar.

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

...They talk morning, afternoon, day and night about GST. Is this money ultimately money from GST, which they themselves did not receive morning, afternoon, day and night?

I have said it clearly earlier, Mr Chairman, "willing buyer, willing seller". The Selangor State Government buys the company, in accordance with the Act, and after that it buys, and it applies for a loan from PAM. It must give the assets to us, and in the end, indeed the people will pay, because Selangor is the one giving it.

Honourable Minister, I have only one.

Last, last. Can this be done?

I raise, Honourable Minister, I raise the issue that causes the company to want to get higher payment is because it thinks it will get continuous profit. So, that is why I have shown the way the state government, together with SPAD and PAAB, determines the bulk service rate, meaning that the bulk service rate will no longer be so profitable for the company. That is why I asked that question. So, if it receives income of only 8 percent, whereas now it gets 40 to 60 percent, no wonder it asks for more money. So, Selangor is responsible for determining that excessive profit is no longer given. This is what I, why do we allow this element of leakage to happen?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, Honourable Minister.

Actually, what I said is that this matter is between the state of Selangor and the asset owner. So, let us leave it to them, and the Federal will decide when it is finalised between them.

No, no, Honourable Minister. The Honourable Minister also has a responsibility. Because Selangor owes the people's money, the nation's money. Selangor is in debt. Meaning it is not debt to the Federal Government but to the people, the nation, which provided that loan.

So, if the Federal Government sees Selangor acting unfairly, allowing excessive profit, SPAD and PAAB are also responsible. Tomorrow, if excessive profits are given, how will it be repaid to the government? That is our question...

Yes, correct. But all of this will be subject to the Selangor Water business plan when they can finalise the takeover of SPLASH. But the Federal Government...

A business plan that harms the people of Selangor.

We cannot take notice as long as they have not finalised the value. That's it.

I want to remind you, a business plan that harms the people of Selangor is a bad business plan.

So, if the government is not happy, so...

That, the Selangor State Government must answer later, or Ampang. Okay, I think that's enough, I think there are many more matters, Honourable Member, that's enough.

I understand this, Honourable Minister. I listened carefully, earlier the Honourable Minister mentioned this is between the company holding the assets and Selangor. That means the Federal Government has no role in determining the price, whether it is more than RM200 million, or RM2 billion, or what? That is the decision of the Selangor State Government.

But I heard earlier, the meaning from the Honourable Member for Sungai Besar, the Honourable Member for Bandar Tun Razak and also the Honourable Member for Kuala Selangor, asking whether the Minister is of the view that this price should also be evaluated by the Federal Government, by the ministry, so that Selangor supposedly cannot abuse its power or offer too high. Is this the role of the ministry in the Federal Government's negotiations with Selangor? Of course this matter is determined...

Yes, the Honourable Member for Batu. Honourable Member for Batu, I have already answered earlier that the Federal Government...

The Federal Government has decided to obtain a review or evaluation of the evaluation carried out by Rashid Husin International. So within a period of one month, we hope that an opinion from the level of— one of the four big accounting firms, and we will use directly...

But the Federal Government is still in negotiations. Get the independent evaluation to get the final price...

Of course, Minister...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Follow the rules, Honourable Member.

Not yet final.

Sedikit sahaja.

Tidak. That is why kami tidak mahu terima apa yang penilaian yang diterima antara entiti dengan pihak Kerajaan Negeri Selangor. Pusat pun bertanggungjawab, so kita lantik satu international valuer to have second opinion on the pricing…

So, Honourable Minister, just a little.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

One at a time. One at a time, Honourable Member.

I think that's enough, Honourable Member.

Just one sentence.

That's enough. Enough, enough.

With this conclusion, I want to get the meaning: the Minister and the Selangor State Government will bear this collective decision, and defend this so that the people of Malaysia and also Selangor are protected. The meaning is that if the agreement is made, no party can abuse this process to give huge profits to any concession company. Is this true or not?

In the end, willing buyer, willing seller, that is the Selangor state with the entity...

Tuan Budiman bin Mohd ZohdiUMNO · BNSungai BesarEN

I think, Honourable Minister, the Honourable Member for Batu is trying to confuse us.

Yes. But the Federal Government also plays a role, right? It is because just now the Minister also said, the Minister said the Minister is now asking for another six months' time period for...

To find an evaluation to get a final price, the final agreed price. That is also the role of the Federal Government. I also want to ask the Honourable Minister...

Let me correct that, that is not right. Federal is not...

It's alright. The Honourable Minister will answer later. I want to ask again. Let me finish first.

Based on the discussions between the Federal Government and Selangor, because of the date for finalising the master agreement, the restructuring has already "limpas" (slipped through), as the Sarawakians say. What is "limpas"?... [Interjection] Yes, lapsed.

Already expired. Okay.

Already lapsed. So, therefore, both parties said that since SPLASH has not yet finalised, they have agreed to extend it by six months, to allow Selangor and the entities to finalise their prices.

I also want to ask, during the negotiations and so on, KeTTHA (Ministry of Energy, Green Technology and Water) was also informed that during the earlier negotiations with the other concessionaires, an inducement was made to Puncak Niaga worth RM577 million in the form of a return of non-water assets. Does the Honourable Minister know about the negotiations and deal made at that time?

I think that needs to look at...

At that time, RM577 million was used for non-water investment.

This matter needs to refer to what agreement was finalised between the Selangor State Government...

No. I just want to ask whether KeTTHA knew or not at that time?

Need to refer back to the agreement, lah.

Doesn't KeTTHA remember the agreement?

What's important is just the value.

Did KeTTHA know or not? Did KeTTHA know or not?...

[Dewan riuh]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

One at a time, Honourable Members...

[Dewan riuh]

I'm just asking whether KeTTHA knew or not. That's all.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

One at a time, Honourable Members. One at a time, Honourable Members.

Yes. I am asking the Minister. I am asking whether the Minister knew or not, but the Minister said he wants to refer to...

If that is in the agreement...

Takkan, this question is very simple cannot answer on the spot. Terima kasih.

No. If it is not in the agreement, then nothing was informed to the Federal Government.

I am asking whether it was known or not. But just now the Minister said he wants to check...

I said just now that if it is not in the agreement between the two parties, that is all the Federal Government holds.

I am asking whether it was known about...

[Dewan riuh]

No agreement, no knowledge [Laughter]

Thank you, Honourable Member.

Okay, that's enough. Air Selangor, I think the rest, wait until the Selangor State Government can finalise it. The Honourable Member for Parit Sulong, on this matter, as I said just now, the six-month extension is for finalising the other agreements, including final pricing, examining the lists of assets to be handed over to PAAB (Pengurusan Aset Air Berhad), and for Selangor to finalise with SPLASH and Air Selangor regarding the licence from SPAN (Suruhanjaya Perkhidmatan Air Negara) once they have agreed on the price. After that, only then will the Federal Government consider the extent to which PAAB can help in terms of loans to Air Selangor. As for the Honourable Member for Parit Sulong's question on whether the reduction in the green technology development budget allocation will cause green technology development to be affected, we believe that although there is a slight reduction there, most of it relates to the allocation not provided for IGM next year, because there is a new approach to the implementation of IGM, which we have already implemented for six years, and so there is new income. So, no allocation has yet been determined for IGM for 2017, but the new approach is to privatise the process among several parties that we have begun to identify. That is the reason for the reduction in the green technology programme, but it should not necessarily have an impact on the programmes that have already been planned. Likewise, I think renewable energy, I have already touched on earlier. Net metering too, I have already said, this is an opportunity for Malaysians: 100 megawatts a year for anyone to apply to install solar PV at their homes and use it for their own needs. Only if there is a surplus is it sold to the grid. So, this simultaneously involves the people in solar farming in their own areas. Earlier, regarding the metering issue raised by several Honourable Members, the metering issue being carried out by TNB. I say here, we have given explanations to many parties. Actually, this matter is not new. Many promotions and distributions of information were held before it started. However, I, on behalf of the ministry and also the Energy Commission, as well as from the information of Honourable Members, acknowledge that not enough information was given to the public beforehand. However, it is certain that in terms of feedback saying the billing is not right and so on, this will actually be more accurate. The new meters and all the new billing processes will be easier. In this way, consumers can manage their own energy use.

It is expected that within these two months, all the machinery at TNB should be restored so that, at the latest, it will bill according to the actual date. So there should be no confusion or fear that the new billing is not accurate or precise. This is because indeed, if some say that previously it was a little, not so much. Indeed, the new billing system will be more accurate. So in one way or another, with permission, there may also have been an improvement in the previous mechanism, and then the earlier meters, the old meters and so on. So, it has become more efficient. But at the same time, consumers can see their own usage through their handphones and so on, and we can manage our own demand for usage at the residential, home or office level.

Okay, next, the Honourable Member from Jasin has touched on......

Dato' Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

The Honourable Minister.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

I want to give way to the Honourable Member for Pokok Sena.

I already answered earlier; perhaps the Honourable Member went out.

Dato' Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Yes, yes. A little more. I want to congratulate the Honourable Minister today for daring to make the statement that PBS will back off from BN. That is a brave statement. Good, good.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

It is not related, Honourable Member, to the Honourable Member's points.

Dato' Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

That is praise, because politics is brave to attract support, to withdraw from BN.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Don't be swayed by the incitement, Honourable Minister.

Hasutan, hasutan.

Dato' Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Good. Earlier I asked for the name of the company that won the tender to prepare this new billing system and its qualifications, and the total expenditure, the cost incurred by TNB to prepare this new billing system. The second thing I also asked earlier: when the bill comes, for example two months at once, in my view TNB should provide a rebate, because these consumers who cannot afford it want to pay all at once, which is quite burdensome for them. If our bill is paid late, TNB usually punishes consumers. It is TNB that delivered the bill late. So it should not be that consumers cannot punish TNB, consumers still have to pay. So there should be some accommodation, by giving a little relief in the form of a rebate to consumers.

A little earlier. However, this late issue will be adjusted later, with permission, in the following month. However, there is indeed some burden because suddenly it is a two-month bill or one and a half months, but it will be adjusted next month. If there is a problem, TNB says you may renegotiate with their service centre to discuss this matter, and I think for those who really struggle, especially those below 40, negotiation can be made with TNB regarding the matter where the bill is larger, so that they are unwilling to pay that month. Later I will return to the matter of...

Dato' Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

That company just now.

The company later. Okay, earlier I think the Honourable Member for Stampin, I have answered too much, especially the earlier one. The Honourable Member Tuan Anuar bin Abd. Manap.....

[Speaking without using loudspeaker]

Honourable Member for Jasin, Honourable Member for Bandar Tun Razak, Honourable Member for Bukit Katil already, Honourable Member for Hulu Langat not yet. The Honourable Member for Hulu Langat is my friend. No need to answer, he will accept it, we can discuss outside...

Tuan Julian Tan Kok PingDAP · PRStampin

[Bangun]

Dato' Haji Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

That company just now.

Yes, yes, there is, there is.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Honourable Minister, I need a written answer for the programmes and projects for 2016, and in detail.

This programme is too long.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Written answer, yes.

Honourable Member for Jasin, indeed you are always interested in this matter. I have answered part of it. If it is about asking for rebates, for these two years we have given rebates, because our estimate in terms of calculating the prices of input materials such as coal and gas is indeed lower than what we had expected, since we determine tariffs for three years. And that is why we have given the pass-through of the ICP process, imbalance pass-through: if prices rise, they rise, but if prices fall, they fall. So, we have given a rebate of 2.25 sen in the first year, and in the year that has just ended, 1.52 sen per kilowatt hour. Regarding TNB's role, for CSR, I understand there are two concepts: individual lamp installation applied for and charged at RM10 a month, included in the bills of applicants, subsidised application costs. What is applied for by the municipal council, this cost is borne by the municipal council. The installation of government-financed street light projects is under KKLW (Kementerian Kemajuan Luar Bandar dan Wilayah, Ministry of Rural and Regional Development). We will try to raise this matter with TNB later. For wiring applications for rural houses in the state of Sabah, there is a scheme known as the Assistant Rural Wiring Scheme (ARWS), since 2011, created under the NKRA, Rural Basic Infrastructure of KKLW, and this scheme involves installing wiring for two lamps and one socket at a rate of RM510 per unit. Now a total of 3,382 houses have been completed for installation. I think this programme, if in the Peninsula it has not yet been implemented, but for Sabah it has already begun. Honourable Member for Sandakan, Honourable Member for Putatan, I have answered everything earlier. Honourable Member for Kota Kinabalu. Yes.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Honourable Minister, Mr Chairman, Stampin is also rural for Sarawak, for the existing programmes, if they are the same.

I understand that, for the information of the Honourable Member for Stampin, energy matters in Sarawak are directly under the Sarawak State Government, acting under delegated powers to the Sarawak State Minister of Infrastructure. So, I understand they have their own programme in terms of helping with wiring for those who are unable to...

Tuan Julian Tan Kok PingDAP · PRStampinEN

Thank you, Honourable Minister.

I will check and clarify, yes.

Tuan Julian Tan Kok PingDAP · PRStampinEN

But my question is not about wiring, but about green technology application in rural Sarawak, such as solar panels and electricity supply. So I think this is under the Honourable Minister's ministry. Thank you.

It should be, but for the information of the Honourable Member for Stampin, since the power over energy management is at the state level in Sarawak, if the IT feeder tariff does not function in the State of Sarawak, they do not contribute to that 1.6 per cent. However, we understand they have their own programme in terms of greening and use of renewable energy. But on the incentives made by the state government and by us at the Federal level, it is merely to monitor the programmes conducted by SAD there.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Thank you, Honourable Member. I accept the Honourable Member's answer. That is one of my questions, but one more question, namely the use of solar power in rural areas, which has nothing to do with Sarawak Energy.

Yes, that is under KKLW. If it is in rural areas under the KKLW ministry, or the Ministry of Rural and Regional Development, okay.

Tuan Julian Tan Kok PingDAP · PRStampinEN

I mean, I want to ask for confirmation, I mean from all the programmes...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Follow the proper procedure, Honourable Member. Don't do it like that.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Okay. Later I will, if possible.

Later I will, later I will.

Tuan Julian Tan Kok PingDAP · PRStampinEN

Yes, in terms of all these programmes, it means Sarawak is not included, the listed programmes, projects and programmes of RM32 million in 2017. It means this programme does not include Sarawak.

If it is a grant, it does not go directly to the State of Sarawak. However, in terms of policy, we always discuss with their side, and where appropriate, such as, even sewage for example, which is actually under the Sarawak State Government, we help. If it is mostly in the form of loans, then with loans. For details, okay, we will discuss later. For the Honourable Member for Pokok Sena and also the other Honourable Members just now, the company operating BCRM is one of the largest companies in the world using the SAP system, and the cost involved, as understood through TNB, is RM180 million starting in 2014.

This programme, this metering system, has been carried out with others in the world, such as in France and Singapore. So, the company's track record of success, they also operate in France and Singapore. Honourable Member-Honourable Member, I think I have covered most of what I touched on. So, whatever matters I could not touch on, especially those involving data...

Honourable Member for Kuantan, Honourable Member for Kuantan, Honourable Minister.

Oh! The Honourable Member for Kuantan. The Honourable Member for Kuantan has also had coffee with us many times [Laughter]. Previously this Honourable Member often pestered me when I was Minister of Science about Lynas, but to be fair, she is quite an objective person. On the matter of tests or investigations to ensure the quality of water produced at our plant, or before it enters this plant, there are procedures and operating systems and operating processes that have been set. Indeed, for SPAN and for us as regulator, we process and distribute water, apparently with the operator. So, we have to take the water quality as given in the river, although monitoring is also carried out by EIA and certain operators.

Regarding pollution, especially in terms of pesticides, I agree with the Honourable Member for Kuantan that although there is no test before the water enters the plant, samples are taken. When we operators also have chemists in all those plants. Before entering and after exiting, sampling is also done. Apart from that, the health side, the Ministry of Health, takes samples from time to time, not only when there are complaints such as smell complaints and so on. However, we are well aware that, I think, there needs to be a comprehensive system involving all parties to conduct supervision and also monitoring in terms of water quality in rivers before it enters the plant, because when near the plant, our officers and technicians say the smell exceeds what is set, or if chemical analysis is carried out and we shut the plant, it is too late already. 10,000 people already will not get water for the next 48 hours...

I'll be brief, Honourable Minister.

...I acknowledge this. This is not a new approach, involving other ministries, state governments and also local governments, so that our forecasting and supervision are more organised and more comprehensive, as is done in countries such as Korea and Japan. Yes, Honourable Member.

Thank you, Honourable Minister. I'll be brief, Honourable Minister. I have asked about the states that are water operators facing, firstly, water deficit. Secondly, our efforts to reduce NRW. Thirdly, modernisation for water, because we face similar problems to the states facing water deficit. Thank you.

Okey, betul.

[Bangun] .

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member for Kuantan, please stand up, Honourable Member.

May I, Honourable Minister, may I respond a little.

It's 7.30, let's close.

Yang Berhormat Menteri, saya tidak mahu isu ini jadi macam ‘Bangau oh Bangau’. Dalam isu pencemaran racun terlarang banned pesticide di Cameron Highlands, saya mengambil inisiatif untuk berbahas di empat kementerian di peringkat Jawatankuasa. Setiap kementerian mengatakan seperti yang tadi Yang Berhormat Menteri kata, “You take whatever is in the raw water”. Menteri Kesihatan kata, mereka “Take what comes out, we just test what comes out”. Timbalan Menteri Pertanian pula kata, “There is no such thing” dan kemudian Menteri NRE tadi tidak sempat jawab. Dengan pengurangan bajet untuk mengawal selia kualiti air, itu menjadi isu besar pada saya. Jadi I mean we are putting this issue in front of us. Isu yang amat penting kerana ia melibatkan racun terlarang dalam air minuman dan juga air sungai, air minuman, water catchment, all the levels ini. Jadi Yang Berhormat Menteri kata “Perlu ada satu cara kaedah lain untuk menangani” but who want take the lead, who want take the responsibility? In the mean time, we continue to be poisoned? I mean this is an issue that has to be addressed and I have not seen all four ministries push, push sana dan ini bukan isu air sahaja, banyak isu. Kita hanya jaga kita punya domain. I do not think we can continue to be like this, Yang Berhormat Menteri.

Okay, thank you for the Honourable Member's comments and concern.

Never mind, I will take the lead with the relevant ministries to discuss at Cabinet level how to coordinate this matter because this is everyone's domain but no man single task, okay. Last two matters, just a little. With NRW, starting next year, the Federal Government is aware that it is not good enough to give state governments loans to build dams and reticulation systems, but only 50 percent of the water reaches homes in this one. It has already been proposed for that purpose. So, indeed, if it brings in states that have migrated to WSIA, non-revenue water, if it is CAPEX, it is under PAM. If not, it is OPEX, and most operators, although we determine in the business plan how much they must invest and by what percentage they must bring down NRW, most of them, because they do not review tariffs, cannot achieve that target. Based on that, next year the Federal Government has allocated RM500 million as grants to the six states with the highest NRW. After that, another RM500 million based on KPI for the other states. You bring down NRW by 1 percent, okay, we pay 50 percent of what you have spent. We reimburse you for what you have spent. So this is in the process of implementation, and hopefully this will increase the reserve margin in areas that are badly affected and at the same time force operators to take on the role of reducing NRW on a dollar-to-dollar basis reimbursement. Finally, the issue in Johor, indeed between Johor and Melaka, which have such moderate margins in terms of, and the subject of reliability is subject to whether there is rain or not. The Central Government, together with lead with our ministry as well as SPAN, is in discussion with Johor especially on actions that need to be expedited, including new piping projects and also the dam at Sedili. I think the problem in Johor, Mr Chairman, is the same as in other states. There are dams, but dams are poorly maintained by the state because, say, a water dam, on the water, is under us or the operator, but the water catchment is under the state. At the dams, oil palm or papaya planted is only up to 50 feet from the dam bank. So, this is the major overhaul in this matter, to ensure water becomes truly a basic commodity that must be supplied to the people with actual quality, as the Honourable Member for Kuantan said, "turn on the tap and can drink." At home too, turn on the tap and can drink too. We drink it, but there is a filter lah. So, indeed we want to move towards the level of, which is said to be standard 9000 if in other states. I think that concludes it, Honourable Member for Seputeh. Thank you all..

Puan Teresa Kok Suh SimDAP · PHSeputehEN

[Speaking without using the loudspeaker]

I have already discussed green technology earlier. The Honourable Member for Langkawi too, I can answer in writing later.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Yes, so you have finished, Honourable Member?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Thank you, Honourable Member.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Honourable Minister, I want to ask one question regarding the territory because...

[Dewan riuh]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

That's it, that's it, Honourable Member.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

No, no, there is a connection. The territory here has no allocation to the Federal Territory, but I read a news report from BERNAMA which...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

This is a new issue, Honourable Member. Has it been debated earlier?

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Water, water. No, I want to ask.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

New issue, Honourable Member. Meet the Minister after this, meet the Minister.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Under whom is this? Because the Minister for Federal Territories went to do the ground breaking at a company for a water storage controlling system…

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)

Yang Berhormat.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

...But there is a bill which supposedly will be tabled by the Honourable Minister. So under whom is this? There is tube well construction. There are 1,200 tube wells to be built in Kuala Lumpur. So whose man's land is this? Yours or the Federal Territory's?

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Member, new issue, Honourable Member, no need to answer. You can answer in writing.

Later we'll talk over kopi tarik.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Honourable Members, the question is that the sum of RM98,660,000 for Matter B.29 under the Ministry of Energy, Green Technology and Water forming part of the Schedule be agreed to. [Question proposed, and agreed to] [The sum of RM98,660,000 for Matter B.29 ordered to form part of the Schedule]

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The question is that the expenditure of RM1,576,068,800 for Matter P.29 mentioned in the Development Estimates for 2017 be approved. [Question proposed, and agreed to] [The sum of RM1,576,068,800 for Matter P.29 approved as part of the Development Estimates 2017]

Bill — Supply Bill 2017 and Development Estimates Motion 2017 Committee — Clause B.32 [Schedule] - Clause P.32 [Development Estimates 2017] -Bill

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Supply Head B.32 and Development Head P.32 under the Ministry of Federal Territories are open for debate. Yes, the Honourable Member for Lembah Pantai.

Puan Nurul Izzah binti AnwarPKR · PHLembah PantaiEN

Thank you, Mr Chairman, for giving me the opportunity once again to take part in the debate. On Supply B.32, under Item 050000 – DBKL and also sub-item 050100. Mr Chairman, I touch on the issue of the project in Bukit Gasing because the allocation for DBKL has been cut from RM28 million to RM9 million, that is, by 67.8 percent. I touch on the Bukit Gasing project because there is a project involving 149 residential units and a three-storey villa near Taman Gasing Indah. I was informed that residents went through the objection process via the Rule 5 process under DBKL, but what I am worried about is that nearly 99 percent of all objection processes carried out by residents usually reach a dead end.

Puan Nurul Izzah binti AnwarPKR · PHLembah PantaiEN

So I respectfully request the kind assistance of the Deputy Minister. In this week alone, a project approved by the Mayor of Kuala Lumpur is at risk of landslides, and residents are still waiting for eight items of the report on the technical study of this project, but they still have not been submitted by DBKL and also by the developer. We want DBKL to be firm with developers, do not appear to be giving these developers more and better treatment than residents. Firstly, the geological survey report, structure report in studying the physical condition of the housing project, land slope report, geohazard mitigation of safety of the community in the neighbourhood, geohazard mitigation, DBKL Technical Report from the department and traffic impact assessment including hydrological report. So I bring this on behalf of the residents because the proposed housing project is located on a very high, very steep slope and is classified as a critical slope. Strangely, in 1996, DBKL, especially the Mayor, did not approve the Taman Gasing housing project, which at that time was said to be unsuitable for high areas or hill slopes, and it was decided that all land cutting in this area was not permitted. I also bring up the mudslide incidents that have occurred from time to time, including those causing property damage and losses. This matter got worse on 8 May 2016, when Taman Gasing Indah witnessed a mudslide incident which resulted in the road having to be cleaned by the residents themselves, although later assisted by a DBKL agency. What we want is for DBKL to carry out its responsibility, which is to force developers, when development on hill slopes takes place, to be rejected. I think this is quite important, and I raise it: why was there a difference between 1996 and ten years later? Did the hill slope suddenly get permitted for development? On 13 November 2016, that is three days ago, again water from the project flowed rapidly until it filled the roads around Taman Gasing Indah. I will hand it over to the Deputy Minister because, to me, this is the clearest evidence that this project must be reviewed and cancelled by DBKL for the safety of the public, and all eight reports must be provided. Residents are also worried about their safety. In addition, with the issue of when development projects take place, it is difficult for them to exit in the direction of Kampung Pasir, Pantai Dalam and Petaling Jaya, which are already congested. So the problem is circular, not focused only on one particular place. Good, next Mr Chairman, I refer to Budget 2017, and I hope that when I bring it up in Parliament, please, Deputy Minister, I am sure the Deputy Minister is committed and able to give clear directives to the Mayor. What is the use of having a Minister if they cannot ensure that projects on slopes and hill slopes are stopped when they endanger local residents? Lembah Pantai Parliament, Mr Chairman, only received RM32 million to rehabilitate water drainage. When it was approved, flash floods still occur, and although I thank you, I hope to be given the latest status report on why we still cannot address it, when there is already an estimate from the Honourable Deputy Minister as to when flash floods will occur. Titiwangsa, I want to lodge a complaint here. Why did Titiwangsa Parliament, with roughly the same number of voters as Lembah Pantai, receive RM111 million? Lembah Pantai only received RM32 million, Mr Chairman. Imagine, RM111 million compared with RM32 million. In Lembah Pantai there are many more disparities. So in my view there must be a rationale for why it is favoured in areas, especially Barisan Nasional areas, and reduced in areas held by the opposition, although previously many changes were made. So for me, distribution and equitable development in allocating funds to Parliamentary constituencies in Kuala Lumpur is important. We were already denied the Implementation Coordination Unit fund of RM5 million, which was given to the Barisan Nasional representative. The answer in Parliament was, because this is the Prime Minister's money, he may give it to whoever he likes, even though we are also people's representatives.

Puan Nurul Izzah binti AnwarPKR · PHLembah PantaiEN

So for me, when there is a clear disparity, I hope the Mayor and also the Minister will ratify it. I also want to state here that I have repeatedly requested reports from the Mayor. For example, the tender report, the pros and cons of why the Federal Territory Foundation was given a project to profit from parking charges. We were promised a report in black and white, but until now I have not been given that report. Second, the rationalisation of DBKL. Why are some zones exempted, some zones delayed, and some zones given increased parking charges? For me, it is not sufficient. We were informed that the Cabinet has met, the Cabinet has decided, so we feel this area and that area are exempted. I hope this also helps our tasks when the rationalisation is given clearly. I also want to raise here, on behalf of the Minister, I hope... because so far, whenever I submit complaints, the Deputy Minister seems more considerate than the Minister lah. So I want to note, I was shocked... [Interjection] Yes, many of us feel the Deputy Minister is better than being the Minister, but never mind, that is our opinion, right [Laughter] Perhaps he is not busy...

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Don't let the Minister and Deputy Minister fight, okay [Laughter]

Puan Nurul Izzah binti AnwarPKR · PHLembah PantaiEN

No, Mr Chairman. This time I am truly sincere. So far there are many simple tasks that I want to work on with the Deputy Minister. I want to note, I objected to some work... I went to the Seri Sentosa area two Fridays ago and I was very shocked. Sorry, last Friday. Why? Development works were taking place by the contractor Binastra Ablebuild Sdn Bhd. I have already given the letter.

Puan Nurul Izzah binti AnwarPKR · PHLembah PantaiEN

However, I want to inform this House, imagine, the contractor under the DBKL permit was approved to carry out work from 10 pm to 5 am. I was shocked because this is the first time residents nearby have had to face loud noise, including cranes, and the main electrical cable they use is shared with the residents' area. It is said they got approval from TNB although the letter was not attached. Electrical cables are also exposed to the public, and what I worry about is that the main crane was above the main area populated by the residents. I was very shocked because, in my view, when development takes place, first and foremost it must be equipped with safety green netting to ensure that the development zone does not endanger the safety of residents. So I saw it myself, and when DBKL gave approval, it went on until 5 am. Who else can say anything? We made complaints, but to be fair, Mr Chairman, and also Honourable Deputy Minister, the damage has been done. Of course I can go there, we make complaints. But I think, yes, please ask the Honourable Minister, whenever any development project takes place, except in places with no residents, you have to exercise the strictest level of rules, with permission. I do not think this is something acceptable, and at that time residents were so angry. So the developer agreed to postpone it for a day or two. But at the same time, the DBKL approval is still in their hands. They say, whatever you say, we have a permit. No matter how angry you are, we hold the permit. So I really request, I have already mentioned the company name, Honourable Deputy Minister. I am waiting and anticipating with full hope. Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Setiawangsa.

Dato’ Ahmad Fauzi ZahariUMNO · BNSetiawangsaEN

Mr Chairman, I want to inform you that the Honourable Minister and the Honourable Deputy Minister for Federal Territories are both considerate. They work together well. I have no problem with either of them. First, I want to bring up Supply B.32, Item 020100 – Federal Territories Sports Council. At SUKMA 17 in Sarawak, the Federal Territories came fourth with 126 medals – 44 gold medals, 44 silver medals and 42 bronze medals. This year the allocation is only RM7 million for SUKMA 18 in 2018; we only put in RM7 million. I want to ask, with this RM7 million, what is it hoped to achieve? Does the Federal Territories Ministry have a target to raise the overall medal tally or our position from number 4 to a higher number? I also want to know about the incentives given to the athletes who were seriously involved in the SUKMA 17 event held in Sarawak recently. Currently, there are eight sports associations under the Federal Territories Sports Council, 28 sports associations under the Kuala Lumpur Sports Council, 19 under the Labuan Sports Council and seven sports associations under the Putrajaya Sports Council. How does the ministry divide the allocation given to these three territories? What criteria are used to ensure that the allocation is fair and equitable? If we look at the calendar of the Federal Territories Sports Council, focus is given to four sports, namely cycling, archery, athletics and tenpin bowling. I want to ask whether this is limited to these four, or whether the Federal Territories Ministry intends to diversify sports activities in the 2017 calendar. I want to refer to 050100. This is the allocation for Dewan Bandaraya Kuala Lumpur (DBKL), which has been reduced from RM28 million to only RM9 million, a reduction of RM19 million. I want to know why there is such a marked reduction in the allocation from the Federal Territories Ministry to Dewan Bandaraya Kuala Lumpur. Next, on 1 February 2016, Dewan Bandaraya Kuala Lumpur carried out the Jom Bayar Saman campaign, setting a flat rate of RM30 and RM50 for traffic offenders involving cars and motorcycles. My problem with these annual programmes, giving discounts, is that it will give the impression that they do not have to pay now. They only need to accumulate all the compounds every year and pay only once a year, because they know they will be given a discount. I only hope that these kinds of programmes should be one-off and not held every year. I want to know how much outstanding DBKL summons remain uncollected. Is there cooperation between DBKL, the Royal Malaysia Police and the Road Transport Department to ensure these offenders settle their debts? Item 03000 – Market Business Complexes. I understand that many business complexes and markets are now filled with people from outside, such as Bangladesh, Nepal, Myanmar, Indonesia and so on. I want to know how many local business licences have been cancelled or withdrawn for the offence of allowing foreign citizens to run businesses on the premises. Finally, Item 08000 regarding river rehabilitation. I want to know the current status of the River of Life project. I understand that it roughly appears not to be moving. However, I think it is progressing continuously. But I want to know what the current percentage of completion of this project is?

Dato’ Ahmad Fauzi ZahariUMNO · BNSetiawangsaEN

There are 43 rivers, or 9 per cent of the rivers in this country, that are polluted, with most of them located in urban areas. Most of the polluting materials come from various sources, including sewage water, industrial and commercial premises, and the small volume of flow due to the very extensive paved areas. I want to know from the Ministry of Federal Territories, which rivers in Kuala Lumpur have been classified as critical in terms of pollution level? What steps is the ministry taking to clean up these rivers? Has cooperation been undertaken now with the Ministry of Environment and various other agencies to ensure these rivers are always in good condition? How many individuals or companies have been subject to action because they were identified as the source of river pollution in Kuala Lumpur? Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Cheras.

Tuan Tan Kok WaiDAP · PHCherasEN

Thank you, Mr Chairman. Under Item 010000 - Progress and Development Management. Under this item I would like to refer to an announcement made by the Honourable Minister last week regarding the matter raised earlier by the Honourable Member for Seputeh, namely the proposal or decision that has been made to establish a special Water Management Department for Kuala Lumpur, which will be formed to manage water for households and industry in the capital city and Putrajaya. The Honourable Minister of Federal Territories also announced that a company named Air Simpanan Sendirian Berhad, or ASI, has been appointed by the ministry to implement a system called the Water Storage and Controlling System, or WSCS, which aims to store rainwater that will be processed into clean water for distribution to residents. Mr Speaker, I understand further that this ASI company will become a concession body, a concession business company given a period of 25 years to run its business. I do not intend to examine the details such as the functions and other aspects of this WSCS system.

Tuan Tan Kok WaiDAP · PHCherasEN

However, what I want to tell Mr Chairman is that this matter has already caused feelings of unease and also suspicion among the public, city folk who suspect there is a hidden agenda, or hidden agenda, in the system, in the plan to privatise the water supply in Kuala Lumpur. Although the Honourable Minister gave a reason that this proposal is because water disruptions often occur in Kuala Lumpur, this is something that usually happens in every state and in every area, including Selangor or Kuala Lumpur. However, the Honourable Minister also blamed the Langat 2 water treatment plant for being delayed in its preparation, and water disruptions being the main reason for setting up a body that is independent from what is currently managed by Selangor, for the Federal Territories as well. This appears to be a business venture, a collusion between the Ministry of Federal Territories and also a private company to reap huge profits. Although the ASI company is said to spend RM2.4 billion to implement this system, Mr Chairman, I want to refer to what has been reported, that to ensure the company's business is viable.

Tuan Tan Kok WaiDAP · PHCherasEN

This company intends to acquire lands that will be used as storage sites, or water storage sites, in several high-value areas, namely Taman Tugu, land area 26.7 hectares; Bandar Malaysia 197 hectares; Tun Razak Exchange, 34.4 hectares; Kwasa Damansara, 943 hectares; Bangsar Junction, 8 hectares; and Jalan Conlay, 2.8 hectares. The total area of all these areas combined exceeds 1,200 hectares, and if we take into account that 100 hectares is equivalent to 1 square kilometre. This is a very large area of land. For example, TRX, I understand that currently each square foot of land there is worth RM3,000. If the 34.4 hectares of land were given to this company, it would bring billions of Ringgit in profit. If all the land requested were obtained by it, this would amount to tens of billions. Therefore, the expenditure or financing that it will be charged, only RM2.0 billion, is a small amount. I hope the government does not make the water disruptions in Selangor and Kuala Lumpur a scapegoat to give it a reason to privatise the water supply in Kuala Lumpur. There is no need for it, and once this plan becomes a fact, water tariffs are also something that consumers in the Federal Territories are worried about. I would also like to raise one matter here. There are two DBKL (Kuala Lumpur City Hall) departments, namely the Mechanical Engineering Department and the Health Department, which will be relocated because the land on which both buildings the departments currently occupy has already been sold to a UMNO crony company, but the buyer of the land will not provide compensation to rebuild these two departmental buildings. I want to ask the Honourable Minister, what is the cost to redevelop these two departments, where is the location of these two departments, and when will this relocation take place? Regarding the land at Batu 3 1/2 Jalan Cheras, where Jakel has bought land belonging to DBKL. This land was sold about four years ago, but Jakel has only paid a 10 per cent deposit. DBKL still allows the site to remain empty and it appears no planning has been carried out. What is the reason? Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Labuan.

Datuk Rozman bin IsliUMNO · BNLabuanEN

Thank you, Mr Chairman. I will go straight to Item 020100 - Federal Territories Sports Council. Honourable Minister, as we are well aware, the Labuan Sports Council (MSL), which had previously been at state level, because of the consolidation process of the Federal Territories Sports Council has no staff or secretariat. However, it is still needed because Labuan is far from the Federal Territory of Kuala Lumpur where MHWP is based, and many associations in Labuan have expressed dissatisfaction. So I would like to ask here whether the allocation of RM7 million can be provided so that the Labuan Sports Council can still function, at least with the status of a District Sports Council or under MHWP. To assist MHWP in development programmes, the MSL, of which I am the Chairman, could be given empowerment to manage programmes or coordinate sports development programmes involving sports associations in Labuan.

Datuk Rozman bin IsliUMNO · BNLabuanEN

Next, Item 030100 - Labuan Corporation. We can see here a reduction of about RM10 million. That is a lot, Honourable Minister, for Labuan, which has only RM49 million all this time, and the loss of about RM10 million is about 20 per cent. So I want to know why it has been reduced, when in fact we need an increase. For the Honourable Minister's information, in Labuan there are indeed many departments under other ministries that carry out various tasks.

Datuk Rozman bin IsliUMNO · BNLabuanEN

However, most of them are allocated insufficient funds to handle maintenance, drainage and various other things. Usually they will refer to or request assistance from the Labuan Corporation. So with this reduction, the Labuan Corporation will certainly find it increasingly difficult to provide assistance to them. So I request clarification. Next, I wish to ask about Item 02000 - Roads and Bridges, RM85 million. Will Labuan receive a share of that amount? Likewise Item 02500 - Socio-Economic Development Programme, which is only one million. How much will be channelled to Labuan? The development shown here totals over RM202 million. What are these developments? Please list them, including the RM37,700,000. What will start to be implemented? Anyway, thank you for the large development this time compared with previous years, please provide the list. Finally, Item 090600 - Discount on passenger ferry fares, RM11 million. I would like to ask whether, if we feel it is necessary, it can be changed to other purposes, especially for socio-economic development and also for the development of the tourism industry. Considering the local economic situation, or domestic economy of Labuan, is now in a very bad state, to the point that we feel we are facing an economic crisis. Because Labuan depends too heavily on the oil and gas industry, many have slipped into poverty due to loss of employment. Many have left Labuan, including those who were previously transient residents of Labuan's oil and gas sector, causing many businesses in Labuan to shut down and others to be in the process of closing. So, can the RM11 million passenger ferry discount budget be changed for the purpose of socio-economic development and also tourism industry development? Given that the budget for the Labuan Corporation's management or supply has been reduced by RM10 million, part of which is for the Tourism Department, whose budget is actually far too small, not even reaching two million. Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Batu.

Thank you, Mr Chairman. Briefly, I hope within enough time. First, under Head 010000 - Federal Territories Progress and Development Management. I want to know that recently we have witnessed a lot of land in the Federal Territories being privatised. I want to get a list of how many lots of land have been sold since 2013? What are the conditions of these sales, and procedurally at the DBKL level or the ministry or the Minister or Deputy Minister who approved the sale of the land? I also want to know, what is the process of social accountability towards the peasant and squatter residents who live on the land sold by this government? Whether their need to obtain housing in that area in the same place can be satisfied under the terms of this sale. This is what the Honourable Member for Cheras mentioned earlier. For land that has been sold by them, we also receive many complaints from hawkers there who feel they have been marginalised and have not been given replacement trader spaces. This is one very serious matter given the difficult economic situation. Traders who have established themselves in the Federal Territories, if they are evicted from Kuala Lumpur, it is very difficult for them to continue their livelihood. Second, under Item 020000 - Federal Territories Sports Council. I want an explanation that the football field at Jalan Jujur in Bandar Tun Razak has been said, this relates to land sales, to have been sold to build a condominium. We know these condominiums are for which class, which level of residents? Whether those who are poor can afford them, and what is the compensation for residents in that area?

We have received complaints from many residents that development in Kuala Lumpur is increasingly marginalising recreational areas and green areas. In the long term, this will create many social problems and also loss of historical values in these football field areas. They cannot be defended and will be replaced with a concrete jungle, which will ultimately cause not only social problems but also climate change that threatens the earth's ecology. Then under Item 06000 - Kampong Bharu Corporation and Development. I want an explanation that the management of Kampong Bharu has once been highlighted as an example for the development of Malay reserve land areas.

Several years ago, when he was Minister, Raja Nong Chik promised that several villages in the Batu area, namely Kampung Padang Balang, Kampung Chubadak and others, would be gazetted as heritage villages. However, until today there is no news of what has happened, and the facilities and infrastructure in these Malay reserve land villages are getting worse, and we do not see any commitment to improve the facilities in this area. Then I also want to ask about the sale of Malay reserve land in the Kuala Lumpur City area. I have received several complaints because in Malay reserve land, it is jointly owned and there are many different names on the land title, and sometimes foreigners, especially Indonesians, have succeeded in buying land and changing the names on the title. Because their names resemble those of locals, there are certain cases that were overlooked or caused by negligence of officers who allowed Indonesian citizens to begin owning and buying Malay reserve land. Then I also want an explanation of how we can overcome this. Under Item 02500 - Socio-Economic Development Programme. I see this with a very small budget. However, in the current situation with the increasingly serious pressures of life due to the economic downturn, what more effective plans are there to overcome the problems of life for city folk? I also want to join in what was raised by the Honourable Member for Lembah Pantai regarding permission to carry out work until late at night. In the Batu area, also in Taman Wahyu, there are contractors who work until 3 am to 4 am. In brief, I also want an explanation under Item 050000 - Kuala Lumpur City Hall. There are reports stating that 80 per cent of Building Plan Development Orders that have been approved and also given large discounts, but more than half of these developments are not implemented. I want to know whether DBKL has become the reason why many developers do not continue development even though DOs have been obtained, and what is the way we overcome it? This is what I also have to raise, the issue that I have repeatedly raised in the housing areas that were promised. Now there is further delay, and I want, for the record, what is the government's way to overcome when a promised project faces delays? This is what I mean by the YTL development area in Sentul. Finally, in my own area again, under DBKL. The road leading to Batu Caves has seen many projects approved. I want to know, what is the total density and number of units that have been approved along the road from Sentul Raya to Batu Caves and the surrounding development? What is DBKL's way to overcome traffic congestion if all these developments are completed, and traffic jams are an issue that must be considered before it becomes serious? Thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Kuala Krai.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Thank you. We want to make Kuala Krai a Federal Territory, yes? [Laughter] Thank you, Mr Chairman.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

Does the Honourable Member intend to change constituency for the next election?

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

It seems you already know, right... [Laughter] No, I am speaking as Chairman of AMANAH Wilayah. So I am responsible for issues in this Federal Territory. Just briefly, Mr Chairman. First, Item 050000 – Kuala Lumpur City Hall (DBKL). Regarding roads, we are watching rapid development at the junction at Bulatan Pekeliling in the Federal Territory. Originally I assumed the purpose of the development was to disperse the traffic on Jalan Tun Razak so that it would not burden the Pekeliling roundabout for drivers wishing to enter the Setapak area. However, it seems the project is actually the second phase of the Duta-Ulu Klang Expressway, or DUKE. That is to say, from Jalan Tun Razak, those wishing to enter DUKE can use this new junction and go straight to the area in Sentul over there. That is to say, we also cannot disperse the roundabout for people who want to enter Jalan Ulu Klang via Setapak. That is actually the bottleneck occurring around that area, namely at Jalan Pahang Barat heading to Ulu Klang. So I think, if possible, it is not too late for DBKL to discuss whether the diversion could also come down to this Jalan Pahang so that the traffic can be dispersed and not gather at the Pekeliling roundabout. That is the first point. Second, I would like to touch on the Kampong Bharu Development Corporation (Perbadanan Pembangunan Kampong Bharu). I have been informed that there is a construction project for apartments in Kampong Bharu on Jalan Raja Muda Abdul Aziz. If I am not mistaken, the Minister can correct me, it will be developed by UDA, and this development in Kampong Bharu, Mr Chairman, is a 70-storey apartment. A 70-storey apartment in Kampong Bharu. Well, commercially it is very profitable for the developer, but for Kampong Bharu, which is a sedentary area, a Malay village area whose road infrastructure and traffic dispersal are close to the very busy Jalan Tun Razak, if this project really goes ahead, what preparations has DBKL made to ensure that the very high density that will arise from the construction of this 70-storey apartment block will not affect the overall traffic in Kampong Bharu and the surrounding areas? I think building such a very tall building may be an idea to highlight an iconic building or landmark, but I think it is very unsuitable in Kampong Bharu, which, in my view, if I may say, is like the old village in Melaka, Kampung Morten, which has been developed beautifully. Perhaps Kampong Bharu could take lessons from that, instead of placing a development which I think may involve adverse effects. Across the road from that building there are already sky apartments and so on that are expensive, and I think if that is the form that will also be built later, then it will not be affordable for the people of Kampong Bharu today. Next, Mr Chairman, I would like to touch on Item 090400 – NKEA – Greater KL/KV (EPP 7: Iconic Places).

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

So, this ministry is also responsible for preserving, perhaps maintaining, building iconic places such as monuments, for example, or buildings that can attract the attention of people who come to Kuala Lumpur and can become an itinerary for our tourists. There is a small monument that was built in the 1960s, designed by an art laureate, namely Datuk Syed Ahmad Jamal, in the Kuala Lumpur area, known as Arca Puncak Purnama, which was built to commemorate or remember the event of the human landing on the moon in the 1960s, which DBKL said last July could no longer be repaired or restored. Yes, perhaps it is shabby, but is it not the responsibility of the authorities who wish to look after these iconic places to see it as a historical artefact that has existed and can attract the interest of the public, visitors and so on?

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

However, it was demolished, and this has given rise to various implications, not merely for the family of the late Datuk Syed Ahmad Jamal, but for art lovers, as a tribute to what our national art laureate did. So I want to ask this ministry: what is the ministry's policy in looking after these iconic places so that they are preserved? So Mr Chairman, that is all, thank you.

Mr Chairman (Datuk Seri Dr. Ronald Kiandee)EN

The Honourable Member for Bukit Bintang.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Thank you, Mr Chairman. I refer to Item 050000 – Kuala Lumpur City Hall (DBKL) and also Item 04000 – Social, Recreational and Public Amenity Projects in Kuala Lumpur. Mr Chairman, I take a serious view of the issue of corruption in DBKL, as occurred when an executive director of DBKL was charged with corruption amounting to millions of ringgit. This is the tip of the iceberg, with permission, in this corruption case. The Ministry of Federal Territories, the Malaysian Anti-Corruption Commission (SPRM) and DBKL itself must establish an effective mechanism to eradicate corrupt practices in this DBKL. At every level in every department. Mr Chairman, I would also like to express thanks and appreciation to the Honourable Minister of Federal Territories for successfully settling the claims for compensation and indemnity for the buyers of the Plaza Rakyat units, which had been left abandoned for almost 20 years. But this case has been resolved by the Honourable Minister, and the buyers appreciate and thank the Honourable Minister. I hope this project can be developed smoothly, because the Plaza Rakyat project should not become an eyesore in Kuala Lumpur. Mr Chairman, regarding the traffic congestion in Kuala Lumpur, which causes great hardship to the city's residents in Kuala Lumpur. I hope the ministry must have a master plan to address public transport in Kuala Lumpur. Apart from the LRT, MRT or rail, buses play a very important role in resolving or overcoming the traffic congestion problem occurring in Kuala Lumpur. Every day we can see that the main roads in Kuala Lumpur are very congested. I hope there is a master plan working with the Land Public Transport Agency (SPAD) on how to overcome the congestion in Kuala Lumpur. Mr Chairman, regarding the approval of projects, as my colleague said earlier, multi-storey buildings of dozens of floors approved by DBKL have become a problem. I have received many complaints from residents in the Bukit Bintang area, especially in Brickfields. One Kondominium Scott Villa project on Jalan Scott Brickfield received strong objections from residents in that area because on this small plot of land, only 5,000 square feet, a building of 30 storeys was approved, a building that could be said to become a fire hazard, with permission, and traffic in that area will increase. I hope DBKL must take action. Although this project was approved by DBKL, the plans have not yet been submitted for approval at DBKL. I hope the fire brigade in particular will ensure that the lanes entering this building must comply with the regulations or conditions stipulated by DBKL. To ensure that, if a fire occurs, lives will not be lost. I would also like to refer to DBKL regarding the forest at Bukit Nanas. I hope DBKL can allocate funds to upgrade this area because it is a site that can attract many tourists to visit this place. This is because in the Kuala Lumpur area, apart from Menara Kuala Lumpur, the Kuala Lumpur Forest Reserve is one of the sites that can attract more foreign tourists to visit. Mr Chairman, one matter I would also like to raise here is the allocation for the constituencies of Members of Parliament in the Federal Territory.

Tuan Fong Kui LunDAP · PHBukit BintangEN

For constituencies won by Barisan Nasional, especially Titiwangsa or Setiawangsa, they receive allocations. However, in constituencies won by the opposition, such as Bukit Bintang, Seputeh, Cheras, Wangsa Maju and Kepong, they do not receive anything at all because these allocations are all given to the component parties of Barisan Nasional. I hope justice should be given to all Members of Parliament in the constituencies. Whether they are from the government or the opposition, we should receive an allocation for our respective constituencies. Finally, I would also like to raise the matter of water, which was mentioned earlier by the Member of Parliament for Cheras. A study must be carried out to review whether it may cause losses to the residents of the city of Kuala Lumpur. [The Deputy Speaker (Dato' Sri Haji Ismail bin Haji Mohamed Said) chaired the Committee]

Tuan Fong Kui LunDAP · PHBukit BintangEN

I hope there will be a study and also dialogue with stakeholders in Kuala Lumpur to ensure this project does not place a burden on the city's residents. That is all, thank you.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Sungai Petani.

Dato’ Johari bin AbdulPKR · PHSungai PetaniEN

Thank you, Mr Chairman, and welcome.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Thank you. Did the Honourable Member for Seputeh agree earlier, or not, to the Motion until it is completed? Please go ahead.

Dato’ Johari bin AbdulPKR · PHSungai PetaniEN

Alright, thank you, Mr Chairman. I have only two matters. Item 050000 – Kuala Lumpur City Hall. I recently, Mr Chairman, hosted a group of businesspeople and several MPs from Korea. So I brought them around Kuala Lumpur City. I was happy to be their host. However, the issue I want to ask about, Mr Chairman, is this: what action does the City Hall or the ministry take when it sees that there are shops, privately owned shops, I think private-lah, perhaps, that have been unoccupied for years in the city, left to become a jungle? The inside of the shops has become a jungle. For example, a shop near Hospital Kuala Lumpur and the main road to Jalan Tunku Abdul Rahman. So I looked, I think it has been about 30 years, and there are many more shops like this that are unoccupied but not maintained, and eventually they become a real eyesore. I am worried that it becomes a building, a place for all kinds of diseases, not only rats— The Honourable Deputy Minister of Health is here. Rats, Aedes mosquitoes, and also places used by drug addicts. So does the City Hall have the power to take action against these shops? If we look closely, there are shops where the plants inside the shop are higher than the roof has risen. So this gives a bad image, and I think there must be immediate action for that. The second issue, Mr Chairman, concerns Item 060000 – Kampong Bharu Development Corporation. So these guests, after they were in Singapore, they stopped by in Melaka. They were very excited, Mr Chairman, when they entered Melaka City. They went to Kampung Morten and they said how magnificent this village in Melaka is. When they saw the new development, they could also see the beauty of the old village. I understand there is a major problem in Kampong Bharu, there are landowners who do not want to move, but I am also confident that the people's representative there, our Honourable Minister of Finance, can discuss it.

Dato’ Johari bin AbdulPKR · PHSungai PetaniEN

If they do not want to move, some action must be taken. This is because when we came from Singapore, entered Melaka, and when we entered Kuala Lumpur, looking up and seeing the Twin Towers, he said it was magnificent. But after the Twin Towers, he invited me to eat nasi lemak, and I came through Kampong Bharu, and he said, "What is this place?" I did not know how to say it, I did not know what to say. Saying it is not a village, not like a village, saying- what should I say? What is this actually? It is so messy, with all sorts of things happening inside and no characteristics at all. Finally he said, "This is a Malay area?" So what do I say? I said, "Yes, there were once upon a time we had Malays here. But now there's a lot Indonesian here." So what do I want to say? Nothing at all, because behind it are the Twin Towers. Surrounded by development. Suddenly a group of people named Kampong Bharu Malay is not cared for, not managed. Surely for decades we could not solve this problem. Therefore I say, if they are stubborn, that is fine, but what harm is there if the government really sits down with them and upgrades them- keep them, that is fine, if they do not want to move out, keep them. But if we can convert Kampung Morten into a tourist attraction, can we not do this? I am sure the Honourable Deputy Minister and the Minister and also the Minister of Finance are more capable than the Chief Minister of Melaka, I believe. With their financial position and also their mental and inner strength. So I think something must be done, because I- yes, although I was born in Kedah, I grew up in Kuala Lumpur. From growing up in Kuala Lumpur, the Honourable Minister of Federal Territories even lived in front of my house in Kampong Bharu before he became a Minister. When he was doing business, his father did business too, I knew his father. Surely it is not that extreme? So it must happen, it must happen. So I think by this I ask earnestly that this is not- we cannot sweep the problem under the carpet, we cannot. Because every year millions of tourists come, and these tourists will certainly go to the Twin Towers. When they go up the Twin Towers and look down, Honourable Deputy Minister, oh, how shameful for us. Truly shameful. So- and when asked, "Is this a Malay area?" I have no answer to it. Once I said I had no answer. I am ashamed to nod, and ashamed to shake my head. So I think, Mr Chairman, something must be done. There must be will power and political power. Political will, not political power, political will. I will support, I will promise, my friends on this side will give support so that we act fairly towards the owners and residents in Kampong Bharu. I think, thank you Mr Chairman.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Kuala Selangor. The Honourable Member for Kuala Selangor, the Honourable Member for Kepong...

Puan Teresa Kok Suh SimDAP · PHSeputeh

Seputeh.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Seputeh. There are three more, briefly please. Go ahead.

Thank you, Mr Chairman, for allowing me to also join the debate on B.32 Ministry of Federal Territories. I will only be brief. Firstly, Item 010400 – Planning and Development. I would like to congratulate the Ministry of Federal Territories, especially the Honourable Minister of Federal Territories and the Honourable Deputy Minister of Federal Territories, on the joint venture project between DBKL and the developer Pancaran Nilai Sendirian Berhad, namely the Federal Territory Affordable Home (RUMAWIP), built on a site of 0.74 hectares, which has now begun to be occupied by buyers. I understand, Mr Chairman, that these homes are 850 square feet and sold at a price of RM299,000, 900 units in total, and it is an affordable housing initiative so that people in the city can own their own homes. I see this as one of the factors that can also encourage ownership, particularly in the capital city.

I also give praise because the Federal Territory Affordable Home model is among the best formulas for overcoming the problem of home ownership in the capital city and may perhaps be expanded across the whole country.

[Speaking without using the microphone]

Also included in the Setiawangsa constituency. Mr Chairman, I would like to refer to Item 010500. \ Mr Chairman, when one enters Kuala Lumpur, the situation today is different from 10 years ago. Added to this are the various unique and up-to-date landscape designs and structures, and the sculptures in the form of cartoon characters created by Datuk Lat at 11 different locations along Jalan Melaka, Jalan Gereja and Jalan Raja Chulan, which have beautified Kuala Lumpur. Apart from that, I also see Kuala Lumpur decorated with the phrases "Allahuakbar" and "Lailahaillallah". A good initiative to transform the atmosphere of Kuala Lumpur. I also see that the DBKL, currently under the supervision of the ministry, is increasingly active in tackling the problem of prostitution around Kuala Lumpur, especially around Bukit Bintang. This I also see as one of the factors that will change the landscape of Kuala Lumpur in the future. Lastly, regarding prudent financial governance, this has also been shown when an allocation of RM958.01 million from the 2016 Budget was used to carry out the mission of enhancing the welfare of city residents and has successfully increased- I am informed that the latest statistics show 25 million tourists visited Kuala Lumpur. This is a very good shift. I see this as also one of the matters that should be considered so that Kuala Lumpur will continue to be a destination, especially for international tourists. In addition, I also see that water is a very important element and a necessity in life. Therefore, I also see that the ministry has taken an initiative to implement a self-managed water storage management project to ensure long-term water supply.

Is this project being undertaken to overcome the water shortage problem, especially in the state of Selangor? So I think Kuala Lumpur has taken a precautionary step and wants to solve the water problem, especially at the level of the Federal Territory itself. Lastly, Mr Chairman, the Honourable Member for Kuala Selangor supports.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Kepong.

Dr. Tan Seng GiawDAP · PRKepongEN

Mr Chairman, briefly on Item 010000; Item 040000; and Item 050000. Earlier, the Honourable Member for Sungai Petani, I also took note, because in these 34 years, whenever there is a project for Kampung Baru, it could not be continued; that is the problem. However, we hope that this time it can be developed in an orderly manner. But it seems the allocation now, RM1.2 billion, is reduced by more than RM100 million, especially for Kuala Lumpur City Hall (DBKL), reduced so drastically from RM28 million to RM9 million. That is what I fear, that many projects cannot be continued because there is no money here. Nevertheless, I hope the Honourable Minister and his Deputy can answer how we can continue them. There are many matters I want to mention. Earlier, we gave the Honourable Member for Seputeh the opportunity to speak.

Dr. Tan Seng GiawDAP · PRKepongEN

First, in Putrajaya and Kuala Lumpur, could the ministry study all signboards, whether for Setiawangsa; sometimes we cannot see them very well, sometimes the direction is wrong, especially with us wanting to rename the roads after all the Sultans, now there are. However, I hope the responsible parties at the City Hall can ensure all signboards are meaningful, that is all. Then, with the shortfall of more than RM100 million, how can we continue with maintenance and so on, for example the projects being carried out? Sometimes we see maintenance is lacking, perhaps staff are insufficient. For example, the private housing project now shared by DBKL at Taman Metropolitan Kepong, which is very popular and liked by people, especially as the number of people going to the park increases. However, with that delat housing project, sometimes we can hear noise, even late at night. I believe DBKL has conditions: if it is late at night, at midnight, how can work continue? We cannot; those sounds will disturb people.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

What if it is late at night in the House?

Dr. Tan Seng GiawDAP · PRKepongEN

It's noisy too, noisy. Mr Chairman is really furious then [Laughter]. That is about maintenance, including the parks; we wait to see how the projects...

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Honourable Member for Kepong, Thursday night is fine, but on Friday night the Honourable Member for Bukit Gantang has already gone home by this time.

Dr. Tan Seng GiawDAP · PRKepongEN

Is that so? Oh! That Honourable Member for Bukit Gantang? That is our problem too. That is the maintenance problem of these parks; we wait for the Taman Rimba Tugu Negara project. I hope the allocated money is used well and the contractors awarded are accurate and effective, not to cronies. We give contractors who can truly carry out the task so that we can create an eco city, which is indeed in the policy of the City Hall to make an eco city. I agree, because just now the Honourable Member for Setiawangsa said, with our river life, how is it now? We don't hear much. There is publicity, indeed there is propaganda, but with billions of ringgit poured into projects to revive the rivers around, we hope these projects can be successful so our rivers are indeed clean. Dirty, polluted rivers; the Honourable Member for Putatan is the same. With this, lastly, there are many matters we want to raise but time does not permit. Just lastly, with the projects being carried out, indeed in Kepong there are many sewerage projects. There is also the MRT project and the problem of traffic congestion with the lack of allocation for the City Hall: how can they improve ways to manage traffic in the Federal Territory, including in Kepong, Bukit Bintang, Seputeh and Cheras? All our areas in Kepong and Setiawangsa are also bad. That is why we hope the ministry can explain to us, with the shortage of allocation, how maintenance work, parks and roads can be carried out effectively. That concludes, thank you.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, the Honourable Member for Seputeh. After the Honourable Member for Seputeh, the Honourable Minister will reply.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Thank you, Mr Chairman. First of all, I must express my regret that the Honourable Minister of Federal Territories is not present to wind up our debate tonight... [Interjection]

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Ministry of Federal Territories, it only looks after Kuala Lumpur, Labuan and Putrajaya, not much work. What does he do? Where does he go? Always sends the Deputy Minister as representative, poor thing. To be like a span. He has to hear all the complaints and criticisms against his ministry, but we know...

Which item? Which item?

Puan Teresa Kok Suh SimDAP · PHSeputehEN

...His power is not the Minister's power.

Which item? Which item?

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Here I want to refer to Item 010100 – Office of the Minister; and also Item 010200 – Office of the Deputy Minister. The Office of the Minister gets an allocation of RM1.6 million, but the Office of the Deputy Minister only RM685,000, a difference of RM1 million. So I propose we change this: let the Office of the Deputy Minister get an allocation of RM1.6 million, and for the Minister who often does not attend and does not reply to our debate, RM600,000 is enough.

Dato’ Ahmad Fauzi ZahariUMNO · BNSetiawangsaEN

Don't knock too hard.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

That Deputy Minister seems to agree.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Yes, yes. He will agree, he is smiling. Wah! Shining. Mr Chairman, here I actually want to ask too. I see the Putrajaya Corporation gets, although the allocation is reduced by RM63 million, only RM95 million; but if we look at Kuala Lumpur City Hall, Item 050000, DBKL only gets RM9 million. I don't understand. What I know is the Putrajaya Corporation is the landlord, right? It builds all the office buildings for all the ministries, then collects rent. DBKL has to spend so much allocation to build roads, build drains and so on.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Why only RM9 million, but the Putrajaya Corporation, which is the landlord collecting rent, can get RM95 million in allocation from the ministry? That is what I don't understand, such a big difference. Here I actually want to ask, about what I asked the Honourable Minister earlier: the Ministry of Energy, Green Technology and Water did not want to answer, and I see his ministry's budget also did not mention it. But we see why the Ministry of Federal Territories went to do a ground breaking ceremony with the price- on the water storage controlling system project. A pilot project worth RM2.4 billion, and he said afterwards, "Oh! Under Kuala Lumpur there is a water body"- a water corporation. Perhaps we mention SYABAS lah, like SYABAS in Selangor. Here, this is a BERNAMA news report. He said, with your permission, "we will sign a 25 year contract with ASI, Air Simpanan Sendirian Berhad to enable company to become the concessionaire to manage the project." Then the Director of ASI, Air Simpanan Sendirian Berhad said that the company will use tube wells to store rain water and natural water as well as filtering the water through a membrane system. The first phase will be completed by the end of 2018 and will build 20 tube wells, and then, in the next 10 years, throughout Kuala Lumpur, 1,200 tube wells, you know. Wow! What was mentioned is not in the budget. I actually want to ask: under whose jurisdiction is this? Because I raised this, and the Honourable Member for Cheras raised this, because it was done by the Honourable Minister of Federal Territories. Is this a form of privatisation of water supply? Is the Federal Government now going to follow the wrong step, the mistake like the privatisation of water in Selangor? Previously in Selangor, under- after Pakatan Rakyat became the government in 2008, it was so difficult for us to buy back the water supply company, SYABAS, and there were many problems in the past few years, and I see now the Central Government will take the wrong step to privatise water supply in Kuala Lumpur.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

This is a 25-year contract. How can this be done by the Ministry of Federal Territories? In this BERNAMA report, he said, "Oh! There is a bill to be tabled by the Minister of Energy, Green Technology and Water." So, I am rather confused. What is the role of the Ministry of Federal Territories earlier in terms of water supply here in Kuala Lumpur? Will we, the Kuala Lumpur residents, in the future have to pay a higher water price than Selangor? I really don't understand why all this has happened in such a hurry without any form of consultation with the people's representatives and no briefing given to NGOs, association representatives and stakeholders. Do we, as water users and residents of Kuala Lumpur, agree? There is no consultation at all. Actually, if we talk about a few years ago, let us look at the Ministry of Federal Territories. If anything the Honourable Minister of Federal Territories wants people to remember, we will remember, "Oh! When he became Honourable Minister he changed the main roads." Eight main roads. Now we are also confused. All these roads are under the names of Sultans. That is one. Second, we see what he will be remembered for in history is that he sold so many plots of land, as mentioned by the Honourable Member for Batu, Cheras and others. Much land has been sold to private parties. If we remember and want to remind what the Honourable Minister of Federal Territories has done, we will remember that roadside parking was also privatised. This is the contribution of the Federal Territories, the achievement of the Minister of Federal Territories to city residents- the city centre of Kuala Lumpur. This is really not proper. I see that- I feel it is so difficult when I mix with- when we make petition objections, objecting to the privatisation of roadside parking under Kuala Lumpur City Hall. Many grumble, many feel angry, and now the Most Honourable Member for Pekan went and signed many contracts with China. When I travelled in China two months ago, I read the newspaper in Chengdu: when the government wanted to raise the ticket price for trains, it was only raised by two Renminbi, meaning perhaps RM1 in our money. They do have hearing. This is a communist country. They have hearing. But when DBKL, when the Ministry of Federal Territories wants to privatise roadside parking, they never asked us. There was never any hearing, and the Mayor went and said, "Oh! The feedback is very good. Everyone likes privatisation, wants to pay higher parking fees."

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Seremban rises.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Yes. The Honourable Member for Seremban, please.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, Mr Chairman. Thank you, Honourable Member for Seputeh. Honourable Member for Seputeh, last week I went to the Seputeh area in Sri Petaling for dinner. After dinner, I saw there is a project to build a condominium of more than 30 storeys in the middle of the Sri Petaling business centre. Sri Petaling is already known as a place that is extremely congested and has no parking. I want to ask: did the Honourable Member object to Kuala Lumpur City Hall? Is it an SOP in Kuala Lumpur City Hall that no traffic impact assessment is carried out before a project is approved?

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Thank you, Honourable Member for Seremban. I have objected several times, objected, but this one is an achievement of the Honourable Minister of Federal Territories. He shut the ears. He does not hear, does not want to see, because he does not sit there. But that is my area. The Seputeh area will be renamed Sri Petaling. A very congested area. Aiyo! Who wants to go there? I feel very worried. That is why I objected. Now we see that Kuala Lumpur City Hall approves all projects of 30 storeys and above, even 40-plus storeys are approved by Kuala Lumpur City Hall. There is no density control. I often raise that we- I see the Honourable Minister will say, "Oh! You Seputeh, you are anti-development" and so on. No, now our place is so congested: no train, no LRT, not passing through many areas.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

But approving such high-density projects. This is the problem. I believe Mr Chairman also supports me. I feel Kuala Lumpur has become not a world-class city, a world terrible city that the world will remember. I don't know how the Honourable Deputy Minister will reply to debates like this. That is why I propose increasing his allocation, because he does all the work. Thank you.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Please, the Honourable Minister.

Dato’ Dr. Loga Bala Mohan A/L JaganathanDeputy Minister of Federal Territories,EN

Thank you, Mr Chairman. Thank you to the Honourable Members who debated earlier in the Committee stage. For the questions raised in the earlier debate: Honourable Member for Lembah Pantai, development in Bukit Gasing. The layout of this area was approved since 1972, again for 171 bungalow units. The road infrastructure system that has been completed only builds; development has not been implemented. Recently, an amended plan was received for additional units and is subject to kaedah lima. No final approval has yet been given and it is still at the consideration stage only. Honourable Member for Lembah Pantai, the development allocation in Lembah Pantai is RM35 million and Titiwangsa RM102 million. Why do BN areas receive more? Distribution of allocation is according to current needs. In fact, the largest allocation was given to the Bukit Bintang area, RM301 million. Again, earlier I heard the Honourable Member for Bukit Bintang say there is no allocation. Bukit Bintang received RM301 million. Segambut RM148 million.

Tuan Fong Kui LunDAP · PHBukit BintangEN

I did not mention allocation. I understand there is RM320 million for Bukit Bintang in the budget dialogue with the Mayor.

Bandar Tun Razak RM68 million. Batu RM63 million, Seputeh RM43 million, Cheras RM41 million, Lembah Pantai RM35 million, Kepong RM32 million, Wangsa Maju RM28 million, Titiwangsa RM102 million, Setiawangsa RM73 million.

What else do you want?

Honourable Member for Lembah Pantai. Project approval for Sri Sentosa: operating hours from 10 pm to 5 am, security level low, open cables not covered. Approval for overtime work...

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Minister, abang has arrived...

[Dewan ketawa]

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Baling has arrived.

Approval for overtime work was given because the requirements of the construction system on site did not allow work to be stopped, as this would affect the stability and safety of the building structure being constructed. This involves cerucuk works, piling, and transfer bin and transfer slab works. However, the permission until 5 am has expired, and this construction site is only permitted to work until 12 midnight. Cranes and safety nets are constantly monitored by DOSH or JKKP, and contractors are not allowed to go beyond the permitted distance. Works lifting construction materials are also not permitted to go outside the alignment approved by DOSH or JKKP.

Berkaitan caj tempat letak kereta yang tidak seragam. Ada kawasan dikenakan caj dan ada kawasan yang dikecualikan. Untuk makluman Ahli Yang Berhormat, kawasan yang dikenakan caj tempat letak kereta adalah di kawasan-kawasan komersial manakala kawasan-kawasan perumahan tidak dikenakan caj tempat letak kereta. Terdapat juga jalan atau kawasan yang tidak dikenakan caj tempat letak kereta adalah jalan belum diisytiharkan sebagai jalan awam, masih di dalam tanggungan pemaju. Kontrak di antara DBKL dan pihak Yayasan Wilayah Persekutuan adalah untuk tempoh tujuh tahun bermula dari 2015 hingga 2022. Pihak Yayasan Wilayah Persekutuan dilantik sebagai kontraktor untuk aktiviti tempat letak kereta disebabkan mereka menawarkan perkhidmatan dan pulangan yang lebih baik berbanding pihak yang lain. Pulangan minima sebanyak RM600,000 sebulan dapat digunakan untuk menampung aktiviti CSR di Kuala Lumpur.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Boleh tanya?

Duduklah. Nanti saya datang you punya bahagianlah.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Bukan, tentang parkir ini.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Boleh ya.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Terima kasih, Honourable Deputy Minister. Pernahkah Honourable Deputy Minister guna parking itu sendiri dan sekarang apa berlaku ialah ramai yang merungut? Macam di Petaling Jaya dan tempat lain, kalau seseorang dia mahu letak kereta, satu jam setengah, jadi kalau satu jam adalah RM1 yang setengah jam dia letak 50 sen sahaja. Akan tetapi dalam parking mesin yang baru ini, tidak boleh. Kalau dia hendak park satu jam setengah, dia terpaksa bayar parking untuk dua jam. Jadi ini ramai rasa tidak adillah. Jadi adakah pihak kementerian boleh mengarah yang concessionaire itu betulkan dia punya collection system supaya ramai orang tidak perlu bayar begitu banyak. Kenapakah itu waktu pengutipan parkir pada 7.30 pagi sampai 6 petang dan hari Sabtu, sepatutnya semua orang tidak kerja, pun kena bayar parking? Ini saya rasa sangat tidak adil. Bolehkah ini juga dibetulkan?

Honourable Member for Seputeh, saya ambil maklumlah. Nanti saya akan bagi jawapan. Honourable Member for Lembah Pantai, caj tempat letak kereta bermeter. Kadar caj parking telah pun diturunkan pada 1 November 2016 dengan mengambil kira maklum balas pengguna dan orang awam. Penurunan adalah seperti berikut- kawasan perancangan pusat bagi kadar yang sebelumnya ialah RM2 bagi satu jam pertama, kadar baru ialah RM1.50 bagi satu jam pertama dan sebahagian daripadanya iaitu penurunan 50 sen sejam. Bagi kadar sebelumnya, RM3 pada jam kedua dan berikutan kadar baru RM2.50 bagi jam kedua dan berikutnya ialah penurunan 50 sen sejam. Kawasan di luar kawasan perancangan pusat beraktiviti tinggi. Kadar yang sebelumnya ialah RM1.50 bagi tiap-tiap satu jam, dan sebahagian daripadanya telah diturunkan kepada RM1 tiap-tiap satu jam, ataupun sebahagian daripadanya iaitu penurunan sebanyak 50 sen sejam.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Ya, Honourable Member for Bukit Bintang, bangun.

Bagi habis boleh Yang Berhormat? Saya baca ini selepas itu.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Tentang ini parking punya.

Ya, parking juga. Kawasan di luar kawasan perancangan pusat, kadar yang sebelumnya ialah RM1 bagi tiap-tiap satu jam atau sebahagian daripadanya telah diturunkan kepada 80 sen bagi tiap-tiap satu jam atau sebahagian daripadanya ialah penurunan sebanyak 20 sen bagi tiap-tiap satu jam atau sebahagian daripadanya. Silakan Yang Berhormat.

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)

Ya. sila.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Terima kasih, Mr Chairman, terima kasih Honourable Deputy Minister. Adakah Yang Berhormat sedar bahawa caj yang diparking dulu ialah 80 sen satu jam? Ini makna bertambah 250 peratus. Ini satu penganiayaan kepada pengguna di kota ini. Adakah kementerian akan menurunkan lebih daripada RM2 sehingga RM1 atau RM1.50? Minta penjelasan.

Honourable Member for Bukit Bintang...

Mr Chairman (Dato’ Sri Haji Ismail bin Haji Mohamed Said)

Ya, sila.

Tuan Tan Kok WaiDAP · PHCherasEN

Terima kasih, Mr Chairman. Saya ingin tanya Honourable Deputy Minister, mengapakah Yayasan Wilayah Persekutuan yang dipengerusikan oleh Yang Berhormat Menteri sendiri mendapatkan konsesi penswastaan semua petak parkir milik DBKL di Kuala Lumpur? Ini merupakan satu kronisme yang diamalkan, yang tidak patut berlaku. Kedua, jika Yayasan Wilayah Persekutuan tidak berkemampuan untuk menguruskan parkir-parkir yang berjumlah melebihi 46,000 petak di Kuala Lumpur ini, mengapakah ia ingin mendapatkan konsesi dan selepas itu kemudiannya outsource kepada sebuah syarikat untuk menguruskan sistem parkir ini? Terima kasih.

Honourable Member for Bukit Bintang. Untuk makluman Honourable Member for Bukit Bintang, caj parking yang dikenakan ini dinaikkan selepas 22 bukan tiap-tiap tahun naik. Kadang-kadang di tempat lain dia akan naik dalam tiap-tiap dua tahun, tiga tahun. Akan tetapi di Kuala Lumpur, kali yang terakhir dinaikkan caj parkir ini adalah pada tahun 1994. Sekarang adalah 2016. Kita juga melihat kepada kekangan-kekangan kesesakan lalu lintas sedia ada. Oleh itu kita pada masa ini, kementerian merasakan bahawa ini adalah caj parkir yang berpatutan. Untuk makluman Honourable Member for Cheras berkenaan dengan kenapa Yayasan Wilayah Persekutuan diberikan konsesi di mana Yang Berhormat Menteri mempengerusikan. Yayasan Wilayah Persekutuan ini merupakan satu pertubuhan yang menguruskan kebajikan dan kemajuan rakyat di Kuala Lumpur dan dipengerusikan oleh Yang Berhormat Menteri untuk memastikan segala pendapatan daripada yayasan ini disalurkan kepada rakyat melalui apa keperluan-keperluan mereka. Konsesi ini diberi dengan smart partnership di mana is a win-win situation di mana DBKL tidak akan lagi rugi daripada segi memberi konsesi parkir kepada individu-individu. Di mana sebelum ini kita dapati, bila kita beri kontrak ini secara individu, DBKL rugi. Tiap-tiap tahun terpaksa membiayai lagi kontraktor-kontraktor atas pembiayaan mereka. Pada masa sekarang, setelah diberi konsesi ini kepada Yayasan Wilayah Persekutuan, DBKL mendapat keuntungan RM600,000 tiap-tiap bulan. Beza dia, dia akan dapat RM2.4 juta dan dia akan dapatlah pulangan untuk membantu di DBKL. Pada masa yang sama, Yayasan Wilayah Persekutuan juga akan dapat keuntungan. Seterusnya saya pergi kepada Honourable Member for Setiawangsa.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Boleh saya tambah sedikit? Kalau Yang Berhormat hendak tanya kenapakah Barisan Nasional selalu hilang sokongan daripada pengundi di pusat bandar Kuala Lumpur ialah kerana tindakan DBKL macam ini, naikkan harga parkir. Sekarang penguat kuasa begitu rajin pergi issued kompaun kepada kita semua. Ini yang menyebabkan- dan kita tahu rakyat sudah semakin miskin kerana kemelesetan ekonomi. Ini yang menyebabkan rakyat susah, yang menyebabkan mereka menyertai perhimpunan BERSIH dan menolak Barisan Nasional. Kalau Barisan Nasional hendak menang lagi di kawasan-kawasan seperti ini, janganlah laksanakan perkara yang parkir yang begitu menyusahkan rakyat ini.

Dato’ Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Itu sebab Honourable Member for Seputeh kuat menghasut itu.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Mesti ada bahan untuk bagi saya untuk hasut. Ini adalah bahan yang saya boleh guna untuk hasutlah.

Penghasut.

Honourable Member for Seputeh, sudah banyak kali saya bilang pada Yang Berhormat. Apabila berhujah, tolonglah profesional. Jangan kenakan orang secara individu, tidak baik. Saya akan jawab soalan. Apa yang dilaksanakan oleh DBKL atau Ministry of Federal Territories telah mengambil pertimbangan banyak isu. Apabila Yang Berhormat berbahas, Yang Berhormat timbulkan isu kesesakan lalu lintas, isu penambahan pembangunan. Kalau semua ini tidak dilaksanakan, macam mana kita hendak bangunkan Kuala Lumpur? Kuala Lumpur akan jadi stagnant, Yang Berhormat. Oleh itu, kita gunakanlah kaedah-kaedah yang sedia ada untuk membantu. Kalau rakyat yang mengikut- undang-undang, dia tidak akan di-clamp, dia tidak akan dapat saman. You have to follow the law. There's nothing wrong in following the law. Itu sahaja yang boleh saya katakan. Seterusnya saya pergi kepada Honourable Member for Setiawangsa. Status peratusan River of Life, tahap pencemaran di sungai oleh beberapa buah syarikat yang dikenakan tindakan dan kerjasama dengan NRE. Status terkini projek River of Life telah mencapai 62.2 peratus berbanding dengan 63.5 peratus yang dijadualkan. Ketika ini, status semasa kualiti sungai adalah berada di kelas tiga dengan kualiti indeks air iaitu 69.0, peningkatan daripada 50.0 iaitu kelas empat dan kelas lima sebelum River of Life dimulakan. Ministry of Federal Territories juga memantau tindakan-tindakan yang diambil oleh Department of Environment melalui River Cleaning Committee di bawah Drainage and Irrigation Department terhadap syarikat atau individu yang mencemarkan sungai. Ministry of Federal Territories menjalinkan kerjasama erat dengan 29 buah agensi termasuk Water and Drainage Department, Sewerage Services Department dan lain-lain bagi memastikan Projek River of Life berjaya mencapai kelas 2B menjelang tahun 2020. Yang Berhormat Setiawangsa bertanya apakah program-program yang dilaksanakan oleh MSWP dengan peruntukan RM7 juta, Malaysia Games (SUKMA) 2018 di Perak. Petunjuk prestasi KPI dan sasaran Federal Territories Sports Council (MSWP) adalah di tempat ketiga terbaik dengan sasaran pingat yang lebih baik daripada pencapaian di SUKMA Sarawak iaitu sebanyak 40 emas, 44 perak dan 40 gangsa. Peruntukan yang diluluskan sebanyak RM7.871 juta akan digunakan bagi program persediaan dan pembangunan atlet. Program-program yang dirancang merangkumi program latihan berterusan sama ada dalam dan luar negara. Selain itu, program seperti klinik dan kursus spesifik sukan dan sains sukan akan diperbanyakkan untuk mencari bakat-bakat baru dalam sukan yang berkaitan. Elaun atlet dan jurulatih juga sedang dikaji semula. Berdasarkan kadar semasa dan berpandukan prestasi atlet dan jurulatih yang terlibat bagi SUKMA Sarawak 2016, sebanyak RM539,800 telah diberikan kepada atlet dan jurulatih yang memenangi pingat sebagai insentif dan penghargaan kepada mereka. Sebanyak RM5,000 diberikan kepada pemenang pingat emas, RM1,500 bagi pemenang pingat perak dan RM1,000 kepada pemenang pingat gangsa. Federal Territories Sports Council (MSWP) juga sedang merancang dan mengkaji semula bantuan yang disalurkan kepada badan sukan yang berkaitan supaya bantuan yang disalurkan dimanfaatkan sepenuhnya. Walau bagaimanapun, Federal Territories Sports Council (MSWP) menjangkakan peruntukan yang lebih besar perlu disalurkan kepada badan sukan di Wilayah Persekutuan memandangkan kebanyakan pusat dan kemudahan sukan sedang dinaik taraf dan digunakan oleh atlet kebangsaan sebagai persediaan SEA Games 2017.

Seterusnya, notis trafik yang tertunggak. DBKL mempunyai sebanyak 5.4 juta notis tertunggak. Daripada jumlah tersebut, sebanyak 2,085,553 telah dibayar dengan kutipan sebanyak RM75,200,130 dan selainnya diproses ke mahkamah. Sebanyak 40,000 lebih notis dibatalkan atas sebab kematian, alamat tidak dapat dikesan dan lain-lain. DBKL juga mengadakan beberapa siri kempen dengan memberi kadar bayaran kompaun khas sempena sambutan Federal Territory Day dan Enforcement Officers' Day kerana mengambil kira kadar ekonomi semasa dan memberi peluang untuk orang yang dikenakan notis menyelesaikan dengan kadar khas. Walau bagaimanapun, bagi mereka yang gagal membuat bayaran, DBKL meneruskan tindakan untuk bawa mereka ke mahkamah. Persoalan mengenai penurunan peruntukan DBKL. Agihan jumlah peruntukan ditetapkan oleh Ministry of Finance. Antara asas yang diambil kira adalah kedudukan kewangan DBKL yang telah berupaya untuk berdiri sendiri dan tidak perlu bergantung kepada kewangan Federal Government. Batal lesen warga asing beroperasi. DBKL tidak melesenkan penjaja asing di mana-mana pasar atau pusat penjaja di Kuala Lumpur. Semenjak tahun 2012 sehingga tahun 2016, DBKL telah mengambil 23,553 tindakan sita penjaja asing. Selain itu, DBKL telah membatalkan 544 lesen warga tempatan yang melibatkan penggunaan warga asing dalam tempoh lima tahun tersebut. DBKL telah menubuhkan task force tindakan warga asing bersama Immigration Department of Malaysia bagi membendung isu warga asing. Pencemaran sungai. DBKL telah mensyaratkan semua premis makanan memasang perangkap sisa minyak atau grease trap untuk mengelakkan pencemaran sungai dari sisa minyak, grease. Sebanyak 10 buah kadang lembu telah dikenal pasti sebagai punca pencemaran sungai. Notis telah dikeluarkan supaya berhenti beroperasi dan berpindah. Sehingga kini, dua buah kandang telah mematuhi notis dan selebihnya diberikan tempoh sehingga hujung tahun untuk berpindah. Honourable Member for Cheras membangkitkan isu penubuhan Kuala Lumpur Water Management Department. Buat masa ini, Kuala Lumpur bergantung harap sepenuhnya daripada Selangor State Government melalui SYABAS yang kini Air Selangor. Tujuan penubuhan Federal Territory Water Management Department adalah sebagai pihak berkuasa air negeri untuk menguruskan sumber air dan bekalan air sendiri dengan kerjasama Ministry of Energy, Green Technology and Water (KeTTHA). Projek rintis water storage controlling ini merupakan inisiatif Syarikat Air Simpanan Sdn Bhd (ASI). Projek ini dibiayai sepenuhnya oleh syarikat di atas tanah milik DBKL secara pajakan dalam tempoh tiga tahun sahaja. Pembangunan water storage tubes ini hanya mengguna pakai underground sedalam 40 hingga 60 meter yang dapat menyimpan air sebanyak satu million liter sehari. Manakala permukaan tanah boleh digunakan untuk tujuan lain-lain pembangunan.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Minta penjelasan.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Ya, Honourable Member for Seputeh bangun lagi.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Minta penjelasan.

Datuk Halimah binti Mohd. SadiqueUMNO · BNDeputy Minister of Urban Wellbeing, Housing and Local Government · TenggaraEN

Apalah Honourable Member for Seputeh ini.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Honourable Deputy Minister, sebenarnya ini adalah apa yang kami bimbang. Ini kerana di Kuala Lumpur kita lihat ada banyak bangunan yang tinggi dan juga semakin banyak bangunan yang dengan high density di semua tempat, banyak tanah di pusat bandar telah pun dijual, sekarang mahu pergi korek lagi buat tube well. Saya rasa ini akan mengakibatkan ketidakstabilan tanah kerana bila- saya masih ingat bila terowong- SMART Tunnel dibuat dalam beberapa tahun itu, banyak pangsapuri termasuk di kawasan saya, dia punya dinding retak kerana bila yang di bawah itu terowong yang begitu dalam dikorek, ia akan mengakibatkan ketidakstabilan bangunan-bangunan di persekitaran. So this is what we worry and saya rasa ini perlu kajian yang lebih rapi. Jangan sign agreement dengan mereka begitu sahaja. Ini kerana kalau tidak, kalau ada bangunan tumbang, kalau ada lebih bangunan yang pangsapuri itu retak, saya rasa yang pihak DBKL, kementerian tidak dapat menanggung kesilapan yang begitu besar ini.

Saya ambil maklum, Honourable Member.

[Dewan ketawa]

Tuan Tan Kok WaiDAP · PHCherasEN

Honourable Deputy Minister.

Tuan Tan Kok WaiDAP · PHCherasEN

Terima kasih, Honourable Deputy Minister. Honourable Deputy Minister belum jawab dengan jelasnya apakah sebabnya sebuah Kuala Lumpur Water Management Department yang harus dibentuk. Kedua, menurut Honourable Deputy Minister, jabatan ini dibentukkan kerana sering berlakunya gangguan air di Kuala Lumpur tetapi baru-baru ini gangguan air bukan disebabkan oleh kekurangan bekalan tetapi pencemaran air sungai-sungai yang dicemarkan disebabkan oleh pihak UMNO yang telah sabotaj.

Tuan Tan Kok WaiDAP · PHCherasEN

The Most Honourable Menteri Besar of Selangor telah buat laporan kepada polis. Tunggulah siasatan polis. Di luar mencemar sungai, di sini jangan melakukan pencemaran bunyi...

[Dewan ketawa]

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Ya, betul, betul, betul... [Applause] [House in uproar]

Tuan Tan Kok WaiDAP · PHCherasEN

Satu perkara lagi saya minta penjelasan sebab Honourable Deputy Minister sendiri berkata satu rang undang-undang kena dibentangkan dalam Dewan ini untuk membolehkan Kuala Lumpur Water Department ini ditubuhkan. Akan tetapi Honourable Deputy Minister sendiri mengakui, kementerian yang akan membentangkan rang undang-undang iaitu Ministry of Energy, Green Technology and Water tidak bersetuju sepenuhnya dengan cadangan pembentukan Kuala Lumpur Water Department. Apakah pendapat, apakah perselisihan pendapat oleh Ministry of Energy, Green Technology and Water itu.

Honourable Member, Honourable Member ini merupakan seorang peguam, takkan akta-akta yang dikenakan di Dewan ini tidak tahu pula, mesti ada prosedur dia. Kita masih dalam perbincangan. Tidak ada apa yang dikatakan oleh Honourable Member berkenaan bahawa tidak ada sefahaman, tidak disetujui ini tidak betul. Kita dalam taraf perundingan Honourable Member. It is in discussion. So in discussion there will be disagreements until we are certain that we will present it to the Dewan. Kerja untuk menyampaikan bill undang-undang itu adalah di bawah tangan KeTTHA, bukan di bawah tangan Ministry of Federal Territories. Seperti negeri Selangor juga, walaupun KeTTHA yang jaga air tetapi Selangor yang bising... [Disampuk] Saya teruskan Honourable Member.

Tidak tahu jaga air.

Tanah dijual kepada Jakel. Oh! Tapi ada lagi satu soalan, kan? Soalan pertama kata kenapa sebabnya. Sebabnya kita di Kuala Lumpur ataupun di Wilayah Persekutuan berasa kita perlu menyelia air kita sendiri. Kita perlukan satu jabatan untuk menyelia or control our own water. We need to find our own water source before we have problems. That is one of the reasons why we are looking at having our own Water Department dengan izin, Mr Chairman. Jelas, tanah yang dijual kepada Jakel tetapi tiada aktiviti pembangunan dijalankan. Untuk makluman Ahli Yang Berhormat Cheras, pihak Jakel dan DBKL telah memindah aktiviti Bazar Larut Malam di tapak dan masih berbincang dengan baki seramai tujuh penjaja medan selera untuk berpindah dari tapak terbabit. Untuk makluman Ahli Yang Berhormat, velodrom masih wujud di tapak dan masih digunakan untuk venue latihan bagi Federal Territory Cycling Association dan pasukan negara sehingga SEA Games. Berapa lot tanah telah dijual sehingga 2013 dan apakah prosedurnya. Sebanyak 79 lot tanah yang telah terlibat dengan penjualan kepada pihak pemaju semenjak tahun 2013.

The sale procedure is carried out through a committee chaired by the Honourable Minister of Federal Territories. Residents at the land sale site who are squatters will be offered rental accommodation in PPR flats around the Federal Territories. There are also residents who will be offered the purchase of low-cost houses at RM42,000 per unit, either at the site concerned or at any project in a nearby area. For development that involves existing shophouses, they will be offered replacement units that are more comfortable. Okay, the Honourable Member for Labuan.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Explanation on that. Thank you, Mr Chairman. Thank you, Honourable Deputy Minister. Were the lands sold by the Ministry of Federal Territories (KWP) sold through open tender or negotiated tender? I ask for an explanation from the Honourable Deputy Minister.

Some were sold through open tender and some were sold through negotiated tender. Next, I go to the Honourable Member for Labuan. Is the Honourable Member for Labuan here? Okay, the status of the Sports Council. For the information of the Honourable Member, the Labuan Sports Council still exists and is placed under the regulation of Perbadanan Labuan, not abolished. All assistance to sports bodies and sports development programmes in Labuan continues as usual through the Federal Territories Sports Council. Projects — the list of projects under the road and department items. For the road plan and department items, EPU has approved the upgrading project of the access road to the Bukit Kalam disposal site, Labuan, as a new project. Apart from that, there are two continuation projects that are actively being implemented, namely the upgrading project of the road from Pohon Batu, Simpang Tamu to Panchor Hitam and the construction of the coastal road from Pantai Badai to Tanjung Aru. Fares: 50 percent of passengers, amounting to RM11 million. For the information of the Honourable Member for Labuan, the RM11 million allocation approved is for a subsidy of a 50 percent discount for passengers entering and leaving Labuan. The purpose of the subsidy is to ease the burden of fare costs for passengers travelling back and forth to Labuan. This has also directly encouraged arrivals of local tourists, especially from the mainland of Sabah and Sarawak. Regarding the Honourable Member for Labuan's proposed question on whether this RM11 million allocation can be changed for socio-economic development purposes and the development of the tourism industry in the Federal Territory of Labuan, in fact the 50 percent fare subsidy for passengers also indirectly boosts the socio-economic development of residents through the movement in and out of the Federal Territory of Labuan. The allocation channelled for socio-economic programmes to Perbadanan Labuan was from RM1 million to be allocated in 2017. Throughout 2016, the ministry allocated 20 percent of the allocation received for socio-economic programmes to Perbadanan Labuan. For 2017, the same rate is expected to be allocated for socio-economic programmes. Is the Honourable Member for Batu not here?

Tidak adalah.

Okay, I will give a written reply. Mr Chairman, since the Honourable Member is not here, may I give it in writing?

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)

Ya, sila...

[Dewan riuh]

Setuju.

The Honourable Member for Batu is not here, okay. Now we move on to the Honourable Member for Kuala Krai.

The Honourable Member for Kuala Krai is not here either.

The Honourable Member for Kuala Krai is not here?

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

The Honourable Member for Kuala Krai is here.

Oh, he is here, hidden behind that.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Here! Here, here.

The Honourable Member for Kuala Krai is here.

Hidden, could not see. Iconic places. The main objective of EPP 7. Iconic places is to make Kuala Lumpur a global city by transforming existing attractions and building new attractions. Among the projects that have been and are being implemented: conserving Masjid Jamek Kuala Lumpur, upgrading Medan Pasar, upgrading the Jejak Warisan trail in Kuala Lumpur. The Ministry of Federal Territories, together with DBKL, is striving to preserve heritage areas with local cultural character to ensure the areas become iconic tourist attractions in Kuala Lumpur. To the Honourable Member for Kuala Krai, the traffic diversion on Jalan Pahang: the construction of the DUKE Phase 2 Highway, which is currently under construction, will divert traffic from Jalan Tun Razak to Jalan Sentul to reduce congestion at the Pahang roundabout at present. Kuala Krai iconic places. For the information of the Honourable Member for Kuala Krai, the Puncak Purnama sculpture was a sculpture sponsored by a company that has since gone bankrupt. However, DBKL took the initiative to carry out repairs but was sued by the artist. Subsequently, DBKL paid a sum of compensation to the artist, and it became a DBKL-liability sculpture that is dilapidated. It could not be repaired any further and became an eyesore. Therefore, it was demolished. The Honourable Member for Kuala Krai, further...

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Honourable Minister...

Yes. Wait, wait, Honourable Member for Kuala Krai.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Okay, finish everything.

Okay, let me finish, I am answering further. The Honourable Member for Kuala Krai, the process of building UDA Legasi in Kampung Bharu and the 70-storey building. The Kampung Bharu development plan has been prepared to establish that this Kampung Bharu development can accommodate high intensity. The government allowed the development intensity of Kampung Bharu together with the development intensity at KLCC to provide a commensurate return to the owners of Kampung Bharu land, who are layered with a fairly large number in Kampung Bharu. To accommodate the city intensity, the development entities specified here, such as the 70-storey development and the UDA Legasi development at 40 storeys high, the government has committed to providing infrastructure facilities for access roads and connections to DUKE known as DUKE 2, Kampung Bharu RAMP, and access roads from the AKLEH highway. In addition to this network, another proposal to reduce traffic, namely through public transport, an MRT station is being built in Kampung Bharu alongside the existing LRT station, which will also be supported by a train proposal that is in the study stage. A study by the consultant appointed to identify the upgrading of this infrastructure can accommodate this high intensity. The Honourable Member for Cheras has already gone home, no need to answer, there is one answer.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Honourable Minister, a brief request for an explanation, Mr Chairman.

Mr Chairman (Dato' Sri Haji Ismail Haji Mohamed Said)

Sila, sila.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Regarding the iconic places just now, indeed if DBKL, which is responsible for preserving these places, lets them become, with permission, dilapidated or look shabby.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

That is one way if we want to remove them, but if we want to preserve them, of course we strive to obtain allocations and so on. So I do not see why we would let something we consider iconic be left as it is. If that is the case, I am afraid that other buildings such as mosques, if left alone, eventually look shabby and we demolish them as well. That is about iconic places. About the traffic reduction road...

Honourable Member, Honourable Member, may I answer the iconic places first.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Please, Honourable Minister.

If the Honourable Member paid attention to my earlier answer, I stated that what happened to the iconic place the Honourable Member raised is different from iconic places elsewhere. This place was operated by a private company, and then we took over when it went bankrupt. When we took it over, we had already been sued by the artist who made the Puncak Purnama sculpture. After that, when it was returned to us to carry out work there, it had been left for too long, the time was too long, and we could not restore the place. But at other places we have maintained the iconic places well... [Interjection] There is no reason for the Honourable Member to say we will neglect or abandon them, no. We do carry out our duties; sometimes we are involved in processes or in something that cannot be avoided, or we cannot save it due to weather conditions, due to time conditions and so on, Honourable Member. Please, Honourable Member.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Yes, I will not ask why DBKL was sued by his family.

You want an answer: he was sued because that drawing or sculpture is the artist's creativity, and he held it to the company, therefore he sued.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala Krai

Saman sebab?

Saman fasal dia own the trademark of the things.

Ha! Listen to that.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Wait, there is another story. Never mind, let us move on, there is another story. I wanted to ask earlier about the drainage system at DUKE just now. My question is whether DBKL cannot at this stage, although rather late, apply for the DUKE phase two development to also include drainage towards Jalan Pahang. That is what I asked, if possible.

Honourable Member, I answered earlier, I did indeed answer yes, it will be carried out.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

That is Jalan Sentul, he said just now.

No, no. That is exactly the answer I gave earlier. Indeed, Honourable Member, I said DUKE is what will help to take traffic out of the Pahang roundabout. Moreover, we actually say this DUKE will take traffic from Jalan Tun Razak to Jalan Sentul.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Yes, that is Jalan Sentul, not involving Jalan Pahang.

Without involving the Pahang roundabout, without involving the Pahang roundabout. That is the DUKE 2 plan we already have.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Okay, I have no contention, Honourable Minister...

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

People take the Jalan Pahang roundabout to go to Jalan Pahang. So they will come down from Jalan Tun Razak, I mean from Jalan Tun Razak, two-way into DUKE and come down to Jalan Pahang, they will miss the roundabout. So this roundabout can go to the hospital, okay. Can go back towards PWTC, not to Jalan Pahang, because if we leave Jalan Pahang from the roundabout, it will definitely become a bottleneck. That is what...

Okay, I understand, Honourable Member, I take note.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Good. Thank you.

We can talk, Honourable Member, after this.

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

Certainly, of course we can.

May I continue, Honourable Member?

Dr. Mohd. Hatta bin Md. RamliAMANAH · PHKuala KraiEN

There is one more matter regarding the development of Kampung Bharu. It is expected that MRT line 2, which will be under one of the Kampung Bharu projects, namely project M101 if I am not mistaken, yes, the 70-storey one with its ferris wheel, will be completed at the earliest in 2021, whereas MO1, not MO1, yes, M101, yes, it has MO1 and M101, will be completed within three years after launch, which is around 2019. So, what is the guarantee that the gap period between these two projects will not cause Kampung Bharu to become congested with the additional high-intensity residents mentioned earlier? Including, if I am not mistaken, in the introduction of this project, there are 600 for local buyers, 300 for international buyers, 300 units for foreign buyers, 96 luxury residence units, all of these are for the people of Kampung Bharu. I would like to congratulate, are the foreign buyers from Kampung Bharu, yes? So, how do we bridge the gap between the MRT completion so that we can accommodate the traffic that will increase.

Yes, Honourable Member for Kuala Krai. Of course we will study and see how traffic dispersal can be implemented to ensure congestion does not occur. I now go to the Honourable Member for Bukit Bintang. The Honourable Member for Bukit Bintang is not here. Okay, thank you. No need to answer. I now go to the Honourable Member for Sungai Petani.

Ada, ada.

Honourable Member for Sungai Petani, dilapidated buildings in Kuala Lumpur. Dilapidated houses and shops in Kuala Lumpur are undergoing redevelopment. Many applications to develop dilapidated houses and shops have been received, and in the near future, these houses and shops will be replaced by new buildings under the redevelopment concept. DBKL's action on these houses and shops is to close the premises with solid walls so that the public cannot enter the houses and shops concerned. This is being done in stages, prioritising protocol roads. Honourable Member for Sungai Petani, do you have more? The Honourable Member for Sungai Petani regarding the redevelopment of Kampung Baharu, not as beautiful as Kampung Morten in Melaka. In the context of Kampung Bharu's development, the government established Perbadanan Pembangunan Kampung Bharu in September 2012. In line with this establishment, PKB has taken action to re-plan the development of Kampung Bharu to make Kampung Bharu an icon as a prosperous, modern, liveable Malay settlement, and through the provision of a detailed and sustainable master plan.

It is expected that the overall development of Kampung Bharu will accommodate and produce a prosperous urban settlement in a garden totalling 77,000 by 2035. The main pillar of this plan is to make Kampung Bharu a centre of Malay culture and a new enclave of economic activity for Kuala Lumpur. This plan also places emphasis on Malay-Islamic design and architecture. The detailed action plan for Kampung Bharu has also identified a site of 40 acres as the Kampung Bharu urban centre area. This area will accommodate a commercial and cultural complex, housing, offices, hotels, as well as a handicraft centre and a complete Malay food restaurant with centralised parking to cater for the needs of this development. This Kampung Bharu urban centre will be connected to the KLCC area through multi-level pedestrian walkways across AKLEH and the Klang River. Based on the engagement carried out, the issue being resolved is estate and faraid. The government is resolving this problem together with Amanah Raya Berhad. Once this problem can be resolved, redevelopment in Kampung Bharu will be easy to implement to achieve the targets of the detailed master plan that has been set. I think what remains is the Honourable Member for Kepong. Is the Honourable Member for Kepong here? The Honourable Member for Kepong is here. Honourable Member for Kepong, insufficient allocation for traffic congestion management in Kuala Lumpur. Although the allocation for the Ministry of Federal Territories and DBKL has been reduced, the Federal Territories traffic task force has taken a strategic collaborative approach and NBOS together with other government agencies such as PDRM, the Federal Territories Education Department, SPAD, and local communities to jointly resolve traffic congestion in the city centre. Taman Tugu, ROL Project. The development project of Taman Tugu is a project for the conservation and preservation of natural forest, which will be conceptualised around education, family and community and responsible recreational activities under corporate social responsibility (CSR) by Khazanah Nasional Berhad. The procurement and implementation process of this project will be fully carried out by Khazanah Nasional Berhad. The Ministry of Federal Territories will monitor the implementation of this project comprehensively to ensure it is implemented to the objectives set by the government.

Dr. Tan Seng GiawDAP · PRKepongEN

Briefly, Mr Chairman. What I mean by this shortage of allocation is not only for traffic, for monitoring, maintenance of drains, roads, work sites and so on, because there is not enough money. Perhaps there are not enough staff either.

Honourable Member for Kepong, I did understand the earlier question, but in the answer given it was limited to traffic. However, DBKL itself has an allocation to coordinate everything the Honourable Member for Kepong mentioned earlier. I now go to the Honourable Member for Seputeh.

Sudah balik.

The Honourable Member for Seputeh has returned.

Yes, the Honourable Member for Seputeh has returned.

Puan Teresa Kok Suh SimDAP · PHSeputeh

Mana balik.

Okay, Honourable Member for Seputeh. Firstly, Honourable Member for Seputeh, I want to inform the Honourable Member for Seputeh that the Honourable Minister of Federal Territories only in this term did not attend the policy and committee sessions. Previously, every time the winding-up for the Ministry of Federal Territories was carried out by the Honourable Minister himself. This is the first time the Minister did not attend because he was not very well. I hope the Honourable Member for Seputeh will not use this reason to say he did not come and so on.

Yes. Bad assumptions.

This is the first time. Whoever I have been able to give cooperation to, the Honourable Members, the opposition Members in Kuala Lumpur, is under the instruction of the Honourable Minister himself. Therefore, I indeed take his instruction and work to ensure all the people of Kuala Lumpur are prosperous and cheerful.

Ha, listen to that...

[Dewan tepuk]

Honourable Member for Seputeh, regarding parking in development projects. The parking issue is indeed a key requirement that must be complied with before consideration and approval of a project. Congestion arises when users do not want to use existing parking but prefer to park along the roadside in double parking. Why does Perbadanan Putrajaya receive RM95 million and DBKL only RM9 million? The RM95 million allocation for Perbadanan Putrajaya is for maintaining Putrajaya, covering maintenance of roads, drainage systems, public facility buildings such as community complexes, payment of utility bills and also building rentals. In fact, the RM95 million provided is not sufficient for the overall maintenance of Putrajaya, which totals RM180 million, where Perbadanan Putrajaya has to cover the shortfall to ensure the well-being of Putrajaya residents is not affected. Water Storage Controlling System by Syarikat Air Simpanan Sdn. Bhd. (ASI), why the National Water Resources Bill is related to KWP. I have already answered this question, Honourable Member, so I need not repeat it, okay? Agreed?

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

Yes, yes. Agreed.

Okay. Thank you. The Honourable Member for Kuala Selangor, the Honourable Member for Kuala Selangor is not here. Okay, thank you, Mr Chairman. I have finished winding up on the policy.

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Yes, thank you, Honourable Member. The question is that the sum of RM240,763,900 for Head B.32 under the Ministry of Federal Territories be made part of the Schedule. [Question put and agreed to] [The sum of RM240,763,900 for Head B.32 is ordered to be part of the Schedule]

Mr Chairman (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

The question is that the expenditure of RM920,685,600 for Head P.32 mentioned in the Development Estimates for 2017 be approved. [Question put and agreed to] [The sum of RM920,685,600 for Head P.32 is approved as part of the Development Estimates 2017] [The Assembly resumed sitting] [Deputy Speaker (Dato' Sri Haji Ismail bin Haji Mohamed Said)

Deputy Speaker (Dato' Sri Haji Ismail bin Haji Mohamed Said)EN

Very well, Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Thursday, 17 November 2016.

[The House adjourned at 10.50 p.m.]

Special ChamberSpecial Chamber

[Deputy Speaker (Dato' Sri Haji Ismail bin Haji Mohamed Said) presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Status of Multi-Storey Car Park at KTM SerdangSpecial Chamber

Dr. Ong Kian MingDAP · PHSerdangEN

Thank you, Mr Speaker.

The title of my speech is the multi-storey car park at KTM Serdang which has yet to be opened for public use and the preparation of the 'lay by' at KTM Serdang.

The multi-storey car park project at KTM Serdang was announced in May 2011 and was expected to be completed in August 2012. However, the company appointed to implement this project was unable to complete it due to cash flow problems. Therefore, the project was simply abandoned for three years.

When I raised this question in Parliament to the Minister of Transport, I received a reply on 11 March 2014 that a new contractor had been appointed by Perbadanan Aset Kereta Api (RAC) on 27 February 2014 and the project was estimated to be completed on 16 March 2015.

However, until today, that is 15 November, although the multi-storey car park appears to have been completed and the electricity supply is already in place, it has not yet been opened for public use. Due to the delay in completing this project and the traffic conditions outside KTM Serdang getting worse by the day, motorcyclists are forced to use the five-foot way as a parking place.

I ask the Minister to explain why this project has still not been completed and when this multi-storey car park will be opened for public use? At the same time, I ask the Minister for an explanation on when the 'lay by' project at KTM Serdang will be completed so that taxi drivers who are currently parking their cars at the bus stop can use the 'lay by' being built to reduce traffic congestion outside KTM Serdang. That is all, thank you.

Datuk Ab. Aziz bin KaprawiUMNO · BNDeputy Minister of Transport · Sri GadingEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of peace and 1Malaysia greetings.

Mr Speaker, for the information of the Honourable Member, the multi-storey car park building at the KTM Serdang station is expected to be opened to the public before February 2017. This multi-storey car park project at the Serdang Commuter Station was completed on 16 September 2015 except for the permanent electricity supply works from Tenaga Nasional Berhad (TNB).

This delay is also due to the complexity of the installation works of electricity supply cables to the compact substation at the project site.

On 1 September 2016, the permanent electricity supply was provided to this building and the testing and commissioning of the Mechanical & Electrical system was completed on 10 October 2016.

Physically, the multi-storey car park building has been fully completed by the contractor. The project consultant is in the process of obtaining approval support for the building plan (PB) and the Certificate of Completion and Compliance (CCC) from the Subang Jaya Municipal Council (MPSJ) before this car park can be opened for public use. The Subang Jaya Municipal Council (MPSJ), through the one-stop centre (OSC) meeting dated 11 October 2016, has approved the building plan conditionally. Therefore, the expected approval of this CCC is at the end of January 2017 and this multi-storey car park building is expected to be opened to the public before the end of February 2017.

The 'Lay By' project, also known as the Parkway Drop Zone project in front of the Serdang Commuter Station, is for the convenience of picking up and dropping off passengers for bus, taxi and public vehicle services. This project has achieved a current work progress of 33 per cent and is expected to be fully completed in July 2017. Thank you.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Allocation for Autism TaskaSpecial Chamber

Thank you, Mr Speaker.

Mr Speaker, Taska Autisme Sibu is the first autism childcare centre established in the state of Sarawak under a government initiative and has been operating since January 2014. According to the President of the Sibu Autism Association, approximately 300,000 people have autism among the 30 million population in Malaysia. This is equivalent to one per cent of the country's population. The establishment of autism childcare centres is seen as a new alternative as the need for them is now increasingly urgent. This is the best approach for families who have children suffering from autism.

I have been informed by the operator of Taska Autisme that there are currently 13 caregivers or teachers for 21 children at the centre. Previously, 30 children were sent to Taska Autisme, although the number of caregivers or teachers remained constant. This means that caregivers or teachers cannot be dismissed when the number of children decreases and be rehired when the number of children increases.

According to the conditions set by the ministry, caregivers or teachers may only be paid RM800 to RM1,000 without the Employees Provident Fund (KWSP). It is unreasonable that the ministry itself encourages childcare operators not to pay KWSP for caregivers/teachers working at Taska Autisme. All caregivers cannot be regarded as volunteers (volunteer) because they have been given specific training to provide perfect and quality childcare services.

The ratio of caregivers to children stipulated by the ministry is 1:10. This is unlikely to be achieved because the children at Taska Autisme are special children. The ratio that can be achieved is 1:3. I was also informed that the expenditure required to manage the childcare centre is RM25,000 to RM30,000 every month. However, the allocation disbursed is insufficient. So, I was informed that Taska Autisme may face closure because the operator can no longer afford the insufficient management costs and has difficulty meeting all the conditions set by the ministry.

Although their intentions are noble, the terms of the agreement and the conditions set make it difficult for Taska Autisme to operate and provide services without breaching the agreement or violating the law. I would like to suggest here that the ministry consider or review applications for childcare management on a case-to-case basis. The Sibu Autistic Association currently manages two autism childcare centres, namely Taska Autisme Sibu and Pusat Agape. Taska Autisme Sibu is supported by the government, while the childcare centre at Pusat Agape is funded by public fundraising from food festivals and public donations.

I would like an explanation from the ministry as to whether it will continue to provide allocations to Taska Autisme and also to the Sibu Autistic Association, which often faces financial problems.

I sincerely hope that the government can continue to provide support and distribution of allocations so that Taska Autisme can continue to operate for the benefit of autistic children and also their families.

That is all, thank you.

Deputy Minister of Women, Family and

Thank you, Mr Speaker, and thank you, Honourable Member for Lanang.

In line with the announcement of Budget 2013 on 28 September 2012, the government agreed to implement a pilot project of Taska OKU for six categories of persons with disabilities (OKU) children, covering Down syndrome, autism, visual, hearing, physical and learning disabilities.

It is hoped that the establishment of Taska OKU will provide space and opportunities for children with disabilities and ease the burden on low-income families to obtain quality early childhood care and education. The objectives of establishing Taska OKU are:

(i) to help parents, guardians and OKU children obtain services suited to the disability they face, while at the same time the needs for early childhood education and development can be met; and

(ii) to help reduce the burden on parents or guardians of OKU children, especially low-income parents or guardians, to obtain perfect and quality care for their OKU children.

To ensure that every child in Malaysia receives quality care, a minimum childcare standard has been developed. The control of the minimum childcare standard is based on the Akta Taman Asuhan Kanak-kanak 1984 (Pindaan) 2007 and the Peraturan-peraturan Taman Asuhan Kanak-kanak 2012. It aims to guarantee quality childcare services. The concept of Taska OKU is:

(i) Taska OKU is an approach that focuses on families who have OKU children; and

(ii) Taska OKU is based on the participation of NGOs, parents, children, government agencies, private bodies and the local community.

As of June 2016, Taska Autisme Sibu operates with 21 children, six caregivers and three therapists (jurupulih).

Since its establishment in 2013, the centre has received grant allocations as follows:

(i) the construction and maintenance costs for Taska OKU amounted to RM500,000, comprising a one-off launch grant of RM200,000 for establishment and an operating grant of RM300,000 a year for maintenance, which were given in 2013;

(ii) in 2014, Taska Autisme Sibu received RM240,000 for operating costs and in 2015 RM26,900 because there was still a remaining surplus balance that was not spent. Meanwhile, for 2016, an allocation of RM239,568 has been approved. Overall, a total of RM990,711.34 has been allocated to Taska Autisme Sibu since 2013; and

(iii) the Sarawak State Department of Social Welfare (JKMNS) informed that the grants approved were only for Taska Autisme Sibu and not for the NGO Pusat Agape. Therefore, the Sarawak State Department of Social Welfare has advised Pusat Agape to apply for administrative grants or ration grants to cover the centre's management expenses.

The Department of Social Welfare (JKM) is of the view that the allocation distributed to the operators of Taska OKU is based on the ratio of the number of children to the number of caregivers as stipulated in the Akta Taman Asuhan Kanak-kanak 1984 (Pindaan) 2007 and the Peraturan-peraturan Taman Asuhan Kanak-kanak 2012. Thank you.

Deputy Speaker (Dato’ Sri Haji Ismail bin Haji Mohamed Said)EN

Thank you, Honourable Minister. Alright, Honourable Members, today's Special Chamber sitting is adjourned until 2.30 p.m. on Thursday, 17 November 2016.

[The Special Chamber was adjourned at 2.48 p.m.]