Dewan Rakyat · 13 November 2019

15th Parliament, session 2, meeting 3 · 899 turns · 74,798 words · official PDF ↗ · Digital Hansard ↗

827 of 899 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Tuan Nga Kor Ming) presided over the Sitting]

Oral Answers to QuestionsQuestions

Deputy Speaker (Mr Nga Kor Ming)EN

Greetings to all Honourable Members. This Parliamentary session runs for nine weeks. And so far in this session, two Members of this House have fainted inside this august House from exhaustion from their service and had to be rushed to hospital, and the Honourable Temerloh is still in hospital. Therefore, as a caring and compassionate Mr Speaker, I would like to offer a pantun to all Members of the House so that you look after your health, because tonight the Sitting is also expected to run until 10 p.m. Honourable Members, listen carefully. Drowsy eyes, heavy belly; A lazy body, let it grow round; Do sit-ups, lift weights for sport; Live a healthy lifestyle, and your soul will be safe.... [Applause]

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Mr Speaker, good morning, and thank you for the pantun offered. Mr Speaker, a pantun alone is not enough, Mr Speaker...

[Dewan ketawa]

Deputy Speaker (Mr Nga Kor Ming)

Betul.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

I request that medical check-ups be held for all Members of Parliament...

[Dewan riuh]

Deputy Speaker (Mr Nga Kor Ming)EN

There is a Parliamentary Clinic.

Khoo Poay TiongDAP · PHKota Melaka · questionEN

1. Tuan Khoo Poay Tiong [Kota Melaka] asks the Prime Minister to state the measures that have been and are being taken by the Election Commission (SPR) to cleanse the Electoral Roll.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHDeputy Minister in the Prime Minister's Department · SepangEN

Thank you, Mr Speaker. Thank you to my friend from Kota Melaka. We also feel grateful that there is not yet a Speaker who has fainted...

[Dewan Ketawa]

Deputy Speaker (Mr Nga Kor Ming)

Sila, sila.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Mr Speaker, for the information of the Honourable Member...

Dato’ Haji Salim SharifUMNO · BNJempolEN

The one speaking has already fainted earlier - not included.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

The Election Commission of Malaysia (SPR) has set up the Electoral Roll Improvement Policy Committee, which is responsible for conducting a thorough study of issues relating to voter registration matters. This committee will also identify the most suitable and best mechanisms for the SPR to implement for the purpose of updating and cleansing the Electoral Roll, in line with the provisions of the law currently in force. For the information of the Honourable Member, the SPR Taskforce Committee and the National Registration Department (JPN), which was newly established, Honourable Member, have been set up for the purpose of coordinating citizenship information relating to voter registration matters, particularly the implementation of automatic voter registration. In addition, the Committee also looks at issues relating to verification of citizenship information for the purpose of cleansing the Electoral Roll. The SPR also carries out updates to the Electoral Roll from time to time based on Rule 10 and Rule 25 of the Elections (Registration of Electors) Regulations 2002. This includes removing the names of electors who have been verified as deceased, and removing the names of electors who have been verified as having renounced or been deprived of citizenship. For this purpose, the SPR has updated the Electoral Roll by removing the names of deceased electors, covering - in 2017, 139,118, and 117,826 names of electors in 2018. Meanwhile, up to 31 August 2019, 91,154 names of deceased electors have been removed from the Electoral Roll. In addition, Honourable Member, the SPR has also removed the names of electors who have lost citizenship status, involving a total of 11,799 records. Of that total, 4,363 names of electors were removed in 2017, and 3,496 names of electors were removed in 2018. Meanwhile, up to 31 August 2019, 3,940 names of electors who have lost citizenship status have been removed from the Electoral Roll. The updating of the Electoral Roll involving electors who have died and lost citizenship status is based on information received from the National Registration Department (JPN). The SPR also looks into issues in the Electoral Roll such as issues of electors aged 90 years, issues of many electors registered at one address, and issues of retired army and police personnel voting as early voters. The SPR has also carried out various efforts to address issues of electors aged 90 and above, and issues of electors registered at one address, by tracing them on the ground based on their addresses and writing letters to obtain confirmation of their status. The SPR has also worked together with the Royal Malaysia Police and the Malaysian Armed Forces to address the issue of retired army and police personnel voting as early voters. Among the actions taken is updating their locality to the Public Locality within the same Electoral Division, to ensure that they vote as ordinary voters if a General Election or By-election takes place.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Finally, the SPR has also implemented strategic cooperation with departments or agencies, NGOs and political parties, particularly in making improvements to the voter data cleansed by the SPR. Thank you.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Mr Speaker, first of all I would like to congratulate the SPR on its efforts.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

This is also proof that the Pakatan Harapan Government has a high aspiration to ensure there is a clean electoral system. Therefore we can see that the appointments of the new SPR members are all experienced, knowledgeable, very progressive and also responsible. However, to ensure the SPR plays its role well, my first supplementary question is whether the SPR can be given the power to suspend or gantung names that are doubtful, that have problems, or electors with problematic addresses? Can the SPR be given the power to suspend or gantung? For now they have no power. Second, under the Elections Act 1958, under section 9A, where all cases cannot be brought to court relating to voter registration issues. Previously many cases were brought to court to challenge the electoral roll names but were rejected by the court because of section 9A. So, can section 9A be repealed so that we establish a principle of separation of powers? Thank you.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you to my friend for the supplementary question. First, the Honourable Kota Melaka asked whether the SPR can be given the power to gantung. That, Honourable Kota Melaka, requires an in-depth study. Any changes we want to make, Honourable Kota Melaka, require much negotiation with stakeholders, pemegang taruh. So, I think that if the Honourable Kota Melaka has good proposals, the Honourable Kota Melaka feels need to be improved, I think the SPR - I have officers - officers who have come here, are ready to listen and ready to carry out relevant studies to ensure the electoral process in our country runs well. As an example, Honourable Kota Melaka, I say, on the new post just made. That is just an example, of how the SPR and JPN try to ensure this voter data can be prepared in a truly transparent manner. That is just an example. Regarding what the Honourable Kota Melaka said about voter data, once it has been gazetted it cannot be challenged in court. I know, Honourable Kota Melaka, that indeed happened after the Likas election, that is history. Honourable Kota Melaka, that matter is indeed a concern of certain parties. However, Honourable Kota Melaka, I think what happened is that the SPR felt it needed finality, a conclusiveness regarding the voter data. If every time this voter data is questioned, there is no finality, it will cause difficulties for the SPR to do its work. So I think on that basis, the reason why we place a provision of finality in the voter data, with respect, is so that it cannot be challenged. This, Honourable Kota Melaka, is actually common in any law. However, Honourable Kota Melaka, I think if the Honourable Kota Melaka feels that the matter may not contradict democratic principles, this new government is ready to study and accept any opinions. But whether we do it or not, that is a different issue. However, we can accept opinions for us to study. Thank you.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Alright, thank you Mr Speaker. The Chairman of the SPR has stated that the automatic registration system will take time. So, my supplementary question on this matter is, how much allocation is required to develop the automatic voter registration application system? When will this automatic registration be implemented, and how will the SPR ensure that the voter list through this application is transparent, secure and also efficient?

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

That question seems small, but it is a lot.

Deputy Speaker (Mr Nga Kor Ming)EN

Answer concisely and briefly.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Alright, thank you Honourable Parit Sulong. Honourable Parit Sulong, regarding how much the total figure is, I truly cannot give it. I do not have that figure. Honourable Parit Sulong asks how much the cost is, right?

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

However, what I know is that the cost does indeed have a fairly substantive cost. A lot. However, regarding what Honourable Parit Sulong asks as to the total amount, I apologise, I cannot give it. I may obtain it from that - if Honourable Parit Sulong wants me to answer, please give a written answer. Regarding what Honourable Parit Sulong asks, when it will be implemented. I understand, Honourable Parit Sulong, we will try our very best before the 15th General Election. If possible, before the 15th General Election, automatic registration can be implemented. Right now, Honourable Parit Sulong, processes are being carried out to ensure this automatic process and the issue of 18-year-olds and so on can be implemented. Third just now, what was it, Honourable Parit Sulong?

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

How will the SPR ensure that the voter list through this application will be efficient, transparent and also secure? The list.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Alright, thank you Honourable Parit Sulong. That, Honourable Parit Sulong, I think the SPR in this New Malaysia era can do it, God willing. Thank you.

Deputy Speaker (Mr Nga Kor Ming)EN

Yes, thank you Honourable Minister.

Dato' Haji Salim SharifUMNO · BNJempolEN

Mr Speaker, Mr Speaker, just a moment. I would like to add a little.

Deputy Speaker (Mr Nga Kor Ming)EN

Dato’ Hasbullah bin Osman, Honourable Gerik. Please. I know many are keen, but I want to give an opportunity... [Recording unclear]

Hasbullah bin OsmanUMNO · BNGerik · questionEN

2. Dato' Hasbullah bin Osman [Gerik] asks the Minister of Youth and Sports to state the rationale for cutting allocations to youth associations and to state the direction of youth that the Ministry has planned to give a picture of the future of the nation's youth.

Tuan Syed Saddiq bin Syed Abdul RahmanMUDA · PHMinister of Youth and Sports · MuarEN

Thank you, Mr Speaker. The question concerns the rationale for cutting allocations to youth associations, and to state the direction of youth that has been planned by the Ministry of Youth and Sports. For the information of the Honourable Gerik, youth allocations have not been cut but have been coordinated and restructured. The Ministry of Youth and Sports wishes to focus on the implementation of programmes and not only on allocations based on administrative funds. What is the difference? The difference is that now we are focusing on youth organisations implementing programmes at the grassroots level and providing auditable working papers afterwards so that we know in the end the money is channelled to productive matters. If compared with administrative funds alone, where in every district there are six to ten youth organisations and they want their own offices. They also want their own staff. However, in the end, the money that could be shared together ultimately cannot be spent on implementing programmes at the grassroots level. However, to help youth organisations, especially at state and district level, the Ministry of Youth and Sports will provide a discount if they wish to be integrated to use the infrastructure or facilities under the Ministry of Youth and Sports so that they do not need to rent offices outside. At the same time, in terms of officers on duty, they can collaborate more closely with JBSN (National Youth and Sports Department) officers at district level, if compared to appointing their own separate officers. This will ensure that administrative funds, which previously were rather difficult to audit, can in the end be redirected to programme implementation that can be felt by all young people in that village area.

Tuan Syed Saddiq bin Syed Abdul RahmanMUDA · PHMinister of Youth and Sports · MuarEN

Second, we also want to create an incentive system, where for youth organisations, in keeping with current changes, they need to include more female leadership in their leadership system. At the same time, we also want to provide incentives for youth organisations that dare to appoint or select more young people under the age of 30 and integrate them into the administrative structure of the youth organisation. Thereby, the direction next year is where we will negotiate with something like a national-level youth organisation, and provide incentives for those who appoint more women and who also appoint more young people and integrate them into the leadership structure under 30 years old. At the same time, to focus on programme implementation - on a paper-work based basis, if compared to administrative funds alone. Thank you, Mr Speaker.

Thank you, Honourable Minister, for explaining the new direction under the leadership of the Honourable Minister. However, I see that for nearly 60 years our youth has had a very well-planned and organised system, from the National Youth Council, the State Youth Councils, the District Youth Councils at district level, and youth associations, where the most important objectives are, firstly, to create leadership, and secondly, members who are enthusiastic and volunteer.

Based on the answer the Honourable Minister just gave, we have killed a youth organisation that was already alive. There are two youth leaders in this House. One on the Government side, and one on the opposition side, namely the Honourable Dato Saripuddin, former President of the Malaysian Youth Council, and also the Honourable Dato' Dr. Shamsul Anuar bin Nasarah, former President of the Malaysian Youth Council. I appeal and request that the old be continued and the new can be improved. If not, the Honourable Minister will create a history of killing youth associations, whether Malay, Indian, Chinese and so on. I ask that this matter be given consideration. Thank you, Honourable Minister.

Thank you, Honourable Gerik. I agree with the Honourable Gerik's view. We should improve what can be improved and continue the system that has long existed, and how we can simply improve it. Therefore, we have not made a decision to change the leadership of MBM, MBN or MBD at district level, or change their source of authority to yet another new organisation. However, what we are doing is restructuring the way they obtain that funding. Therefore, at the central level, for example, leadership at the central level, administrative funds will still be channelled but according to new incentives. This is where they need to integrate more women and young people under 30 years old. At state and district level, we restructure according to programme implementation. This is because we want to increase or we want to ensure that more programmes are implemented at grassroots level, if compared with appointing officers at district level for each youth organisation or to pay office costs which ultimately are very high. When we see this matter can be translated into programme implementation, it can be felt not only by the leadership of that youth organisation, but felt by all youth in that village area or district. Thank you, Mr Speaker.

Deputy Speaker (Mr Nga Kor Ming)EN

Thank you. There are no second supplementary questions? This is strange indeed. Now I invite Dato' Rosol bin Wahid, Honourable Hulu Terengganu.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Thank you, Mr Speaker. Since Mr Speaker opened with a pantun, I too will open with a pantun. From Barisan Nasional to Pakatan Harapan, Question number three needs an answer. Thank you.

Rosol bin WahidBERSATU · PNHulu Terengganu · questionEN

3. Dato' Rosol bin Wahid [Hulu Terengganu] asks the Prime Minister to state: (a) the current statistics on the intake of one per cent of persons with disabilities (OKU) in the public sector; and (b) measures to further encourage the participation of that group in that sector.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHDeputy Minister in the Prime Minister's Department · SepangEN

Thank you to my friend, the Honourable Member for Hulu Terengganu. Sorry, there is no pantun. I am not good at pantun. Mr Speaker, for the information of the Honourable Member for Hulu Terengganu, statistics from the Public Service Department (JPA) show that as of 30 June 2019, the total number of persons with disabilities (OKU) employed in the public service was 3,686 officers, or 0.29 per cent. Meanwhile, recruitment statistics under the Public Service Commission of Malaysia (SPA) show that in 2019, up to June, 44 persons, or 0.49 per cent of OKU candidates, were appointed to the public service out of a total of 8,924 candidates for permanent appointment. In 2018, out of 13,454 permanent appointments made by the SPA, 114 persons, or 0.85 per cent of OKU candidates, were appointed to the public service. The SPA always makes the target of one per cent employment opportunities in the public service for OKU as stipulated in Service Circular Number 16 of 2010 the basis in all recruitment matters. Nevertheless, the achievement at present depends largely on the willingness of the ministries and departments that receive OKU candidates. For everyone's information, so far, it is the Ministry of Women, Family and Community Development that has achieved 100 per cent. In fact, perhaps slightly more. So, we should congratulate the Ministry of Women, Family and Community Development. For recruitment of candidates to contract posts, ministries and departments have been given the authority in the recruitment of candidates before they are certified to the SPA. The Head of Department, also based on the powers conferred according to the relevant regulations, may identify suitable OKU candidates who are registered with the Department of Social Welfare (JKM) for consideration of appointment. Next, to encourage and facilitate all candidates, job applicants including OKU candidates, the SPA has provided an online job registration system. OKU candidates may fill in SPA Form 8i, on the SPA Portal at any time and anywhere by stating their status and category of disability. Next, Mr Speaker, the SPA has also taken steps regarding the minimum eligibility requirements for OKU candidates. Based on the conditions and appointments stipulated in the service scheme. Here I would like to announce that if there are OKU persons out there, the government has also made a decision to grant exemptions to OKU applicants so that they may be exempted from sitting for the Public Service Entrance Exam (PSEE) as a measure to encourage OKU participation in the public service. In addition, members of the commission from among OKU have also been appointed to sit on the Public Service Commission of Malaysia. In disseminating information and guidance on entering the public service, the SPA always implements Outreach Programmes, including setting up booths at career carnival programmes organised by various parties. In 2018, the SPA carried out as many as 61 Outreach Programmes throughout the country. The achievement of one per cent OKU in the public service depends on all parties involved. The SPA is one of the appointing authorities in the public service. Apart from the SPA, appointments of OKU are also carried out by other Appointing Authorities (PBM). That concludes my reply. Thank you.

Dato' Rosol bin WahidBERSATU · PNHulu TerengganuEN

Thank you, Honourable Minister, for an answer that I feel is quite detailed. However, the aspiration to reach one per cent is still far from what was hoped for. The issue is that perhaps there is social stigma among families in registering their OKU children with the ministry.

Dato' Rosol bin WahidBERSATU · PNHulu TerengganuEN

My question is, does the ministry or the government not intend, or intend, to introduce certain incentives for families who have OKU children to register with the ministry? Second, what is the role of the government in encouraging the private sector and also GLCs to employ OKU workers as a means of achieving the aspiration of one per cent OKU workers in the employment sector? Thank you.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you, Honourable Member for Hulu Terengganu, for that good question. I will answer question two first. For the information of the Honourable Member for Hulu Terengganu, the government indeed has no power to impose any conditions on the private sector. Moreover, the government itself is currently facing difficulties in obtaining the number to reach that one per cent target, except for the ministry I mentioned earlier, the ministry involved with OKU, which is the Ministry of Women, Family and Community Development. This is where, if we look at it, for the information of the Honourable Member for Hulu Terengganu, so far what has happened is that only that ministry appears to be more OKU-friendly. Where, I am informed, if we go to their offices, they are also set up in an OKU-friendly environment. So, I think the private sector probably has a bit of a problem. However, I think the suggestion of the Honourable Member for Hulu Terengganu is very good. I think it may be considered by the government. On the Honourable Member's question...

Dato' Rosol bin WahidBERSATU · PNHulu TerengganuEN

For, Honourable Minister, for GLCs?

Ha?

Dato' Rosol bin WahidBERSATU · PNHulu Terengganu

GLC pusat.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

For GLCs, I think we may be able to discuss it, Honourable Member for Hulu Terengganu. I think that is a good suggestion. I think the government is always open to receiving this suggestion. Although, in fact, Honourable Member for Hulu Terengganu, for the information of the Honourable Member for Hulu Terengganu regarding powers, it falls under the Ministry of Women, Family and Community Development. So this is what I sometimes feel: if there are good suggestions, we must channel them to them. As for the Honourable Member for Hulu Terengganu saying social stigma, this is indeed something that I think is acknowledged by the parties involved. In fact, Honourable Member for Hulu Terengganu, it is not only social stigma; we also face problems in terms of public sensitivity towards the OKU community. If we look at it, I am informed that a study has been carried out to see how these matters can be resolved. So far, Honourable Member for Hulu Terengganu, the country that is quite advanced in resolving the problems of OKU or being more OKU-friendly is Australia. So perhaps we can learn from them on how they are able to address the issues that the Honourable Member for Hulu Terengganu has raised. However, I want to tell the Honourable Member for Hulu Terengganu...

Dato' Rosol bin WahidBERSATU · PNHulu TerengganuEN

What I mean, Honourable Minister, is whether the government intends to provide incentives or allowances to families who register their children with the ministry?

Deputy Speaker (Mr Nga Kor Ming)EN

The Honourable Member for Hulu Terengganu cannot ask like a serial. It never ends.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Regarding the Honourable Member for Hulu Terengganu's incentives, so far I do not have information on why, but the Honourable Member for Hulu Terengganu's questions mostly involve specific ministries. My question is more towards...

Deputy Speaker (Mr Nga Kor Ming)EN

Just answer the others.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

My question is more towards issues involving the public service. That concludes my reply. Thank you.

Deputy Speaker (Mr Nga Kor Ming)EN

Now I invite the Honourable Member for Jempol. Second supplementary question.

Dato’ Haji Salim SharifUMNO · BNJempolEN

Thank you, Mr Speaker. I want to reply with a pantun from the Honourable Member for Hulu Terengganu. It is not really a pantun; I am finishing off the sentence he just said, which goes:

"A boat that has drifted too far can still be paddled back, words that have drifted too far bring their own bad consequences." [Laughter]

My supplementary question: does the government guarantee that the special one per cent quota in the recruitment of persons with disabilities (OKU) as public servants will not be affected following the plan to downsize the public service that is currently being considered by the government? So, based on the SPA's report, so far only 3,800 persons with disabilities have been accepted, representing 0.31 per cent. This shows that 0.6 per cent, not even half of OKU, have been accepted for employment. So, my question is, what are the obstacles faced by the government in achieving the target of one per cent of employees with disabilities in the public sector? Has the government carried out any studies to identify the problems regarding the current industry situation in terms of job supply and issues in the recruitment of persons with disabilities, as well as the difficulties faced by persons with disabilities in entering employment? That concludes my reply. Thank you.

Deputy Speaker (Mr Nga Kor Ming)EN

This is not- please, Honourable Member.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

On the study, there indeed is a study being carried out. Honourable Member, the study is indeed being carried out, but it is still ongoing. I cannot share the findings yet. The Honourable Member said about the aspiration to achieve that one per cent; in fact, Honourable Member, it depends on the willingness of all parties. So far, for the information of the Honourable Member, the ministry that is quite forward-looking and has achieved that target is the Ministry of Women, Family and Community Development. So I think Honourable Member, God willing, the target will not be affected, because the OKU target of one per cent will be in line with the total number of positions. Just now, Honourable Member, if you saw what I said, among the measures we have taken, I announced once again that we are granting exemptions to OKU from sitting for the Public Service Entry Exam. Honourable Member, all this time, from the studies carried out, we found that when this exam existed, many OKU could not get jobs because they did not pass the exam. Now we have decided to exempt them from sitting for the Public Service Entry Exam. This is a major announcement made by the government. I think after this, possibly after this exemption, which I am informed will start after May 2019 and onwards, God willing, we will achieve the target set.

Rohani binti Abdul KarimPBB · BNBatang Lupar · questionEN

4. Dato' Sri Hajah Rohani binti Haji Abdul Karim [Batang Lupar] asked the Minister of Human Resources to state on the changes of the Industrial Revolution 4.0 that need to be continued well, following the unstoppable technological changes in facing the currents of modernity in the international world. Is the government ready to overcome the additional unemployment that is about to happen, and what action will the government take to overcome the Industrial Revolution 4.0?

Tuan M. KulasegaranDAP · PHMinister of Human Resources · Ipoh BaratEN

Thank you, Mr Speaker. The Industrial Revolution 4.0 or IR4.0 is expected to have a very significant impact on the labour market and employment, such as the creation and elimination of jobs, jobs replacement. An increase in labour productivity and an increasingly widespread skills gap. Therefore, the nation's human capital needs to be given relevant skills that always meet the needs of the market and the dynamic economy of the country. In this regard, the Ministry of Human Resources, the Ministry of Education Malaysia and other ministries are working, and a Working Committee on Welfare and Talent Development, Technical Working Groups Skill under the Industrial Revolution 4.0, led by the Ministry of International Trade and Industry, has been set up to overcome this problem.

Tuan M. KulasegaranDAP · PHMinister of Human Resources · Ipoh BaratEN

In line with this, various efforts are being implemented by the Ministry of Human Resources in strengthening human resource competency to identify suitable employment in facing the Industrial Revolution 4.0 through its departments and agencies under it. The measures taken by the Ministry of Human Resources are as follows: (i) providing upskilling and reskilling programmes for workers to enhance self-advancement in adapting to changes in future employment needs, future of jobs as well as an increasingly competitive and dynamic global environment; (ii) holding engagement sessions with the industry together with the relevant departments and agencies to provide a clear picture regarding the Industrial Revolution 4.0; and (iii) expanding citizens' access to training to obtain technical and vocational training and education; To date, there are several institutions carrying out these tasks. As an effort to overcome the unemployment rate, the government has taken the following measures: (i) providing the JobsMalaysia employment service; (ii) organising Job Placement Programmes which include career carnivals, placement through client accounts, open interviews, career programmes in cooperation between agencies and so on. For the period January to June 2019, a total of 20,563 job seekers have successfully obtained income; (iii) establishing a one-stop centre combining agencies such as JobsMalaysia, the Social Security Organisation, Human Resource Development and so on; (iv) implementing the Graduate Enhancement Programme For Employability; (v) strengthening and empowering the National Dual Training System programme; and (vi) implementing the Structured Internship Programme led by the Talent Corporation. Thank you.

Thank you. Supplementary question, Mr Speaker. What is the level of readiness of local employers to make the transition to high technology, namely the use of the digital economy or automation in their respective organisations? How can public awareness or target groups be raised regarding IR 4.0, and how can the new policy, namely Shared Prosperity Vision, be achieved in line with it? Thank you.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Thank you, Mr Speaker. We are carrying out several engagements with employers, informing them of the latest situation regarding IR 4.0. However, what we cannot deny is the report made by the International Labour Organization which says that there is a high possibility that over the next 15 to 25 years this will result in the elimination of about 14 per cent of existing jobs. Moreover, for a very long time. But what is important is that although it is a problem at present, in our view and knowledge, it appears that more job fields will be created. This shows that although IR 4.0 will put strong pressure on existing jobs, automation will at the same time help create more jobs. Like Lazada and Alibaba recently, where billions were sold within a day or two, and more jobs were given such as logistics and so on. That is the view that we believe will resolve and help us face IR 4.0. Thank you.

Thank you, Mr Speaker. Having considered the Honourable Minister's answer and digested what was meant. According to the statistical report from 2016 to 2018, a total of 4,030 graduates have been trained and financial assistance approved amounting to RM76,000,095. At present, 231 graduates are undergoing training, for which financial assistance approved totals RM1.7 million. My question is, what steps will the government take to seriously urge the private sector to continue to be involved in training or through internship programmes between the government and the private sector? Thank you, Mr Speaker.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Thank you. That is a fine question. Honourable Member, in fact, various incentives are provided. Recently, the Ministry of Human Resources itself has signed MoUs with several companies where internships and TVET training are carried out there itself, and internship is one of the long-term programmes by the government. I think in our target to achieve skills among the country's workforce, this is one of the ways, and the Honourable Member will surely know that several MoUs made by the ministry and other ministries show that the aspirations and policy of this initiative will bring great benefits to our workers in this country. At the same time, this will provide a handsome salary, increase productivity and also reduce their productivity costs. Thank you.

Tuan Muslimin bin YahayaBERSATU · PNSungai BesarEN

Mr Speaker, siji, loro, telu, papat, I request the answer to number 5.

Muslimin bin YahayaBERSATU · PNSungai Besar · questionEN

5. Tuan Muslimin bin Yahaya [Sungai Besar] asked the Minister of Water, Land and Natural Resources to state what plans there are to rehabilitate coastal erosion and vulnerability specifically along the west coast of the Peninsula, especially in the Sungai Besar area.

Timbalan Menteri Air, Tanah dan Sumber AsliTengku Zulpuri Shah bin Raja PujiEN

Thank you, Mr Speaker, thank you, Honourable Member for Sungai Besar. Peace be upon you and the mercy and blessings of Allah, greetings of peace. Mr Speaker, the government has approved the Project to Address the Phenomenon of High Tides and Coastal Erosion in Various States to be implemented by the Ministry of Water, Land and Natural Resources through the Drainage and Irrigation Department under the Eleventh Malaysia Plan (RMK-11) with a project cost ceiling of RM200 million. This project aims to address coastal erosion problems throughout Malaysia, including along the west coast of Peninsular Malaysia which also covers the coastal area of Sungai Besar. The implementation of physical works on site will be carried out in stages and is expected to commence in 2020. For the state of Selangor, the areas involved in the proposal to upgrade and build new seawalls are, first, Sabak Bernam; second, Kuala Selangor; third, Klang; and fourth, Kuala Langat. Thank you.

Tuan Muslimin bin YahayaBERSATU · PNSungai BesarEN

Thank you, Mr Speaker, thank you to the Honourable Minister for the answer and thank you for the allocation provided. The forest issue, Honourable Minister, this coastal vulnerability issue has become a main topic, a main concern of the Right Honourable Prime Minister when he spoke at the United Nations General Assembly last July. My question concerns the west coast area, especially in the Sungai Besar, Bagan Datuk, Tanjung Karang and Klang areas, which are within a coastline of 1,300 kilometres and are at very high risk. So my question is, what are the ministry's efforts to provide awareness education to residents of coastal areas, especially fishing families, and does the government intend to introduce a more effective forest management system, given that our forest management system through the Selective Management System (SMS), introduced in 1978, is no longer suitable for use at this time? Thank you, Mr Speaker, thank you to the Honourable Minister.

Thank you, Honourable Member for Sungai Besar. What is meant by forest management is mangrove swamps. Okay, Mr Speaker, according to the budget allocated, most of this budget is only for building seawalls, to address the problem of damaged seawalls. However, the ministry has carried out some CSR work, namely planting mangroves. So this we will reconsider according to the existing budget. Thank you.

I was interested in an article published in Berita Harian last month, entitled, "Coastal erosion is becoming more severe in the Peninsula". The issue of coastal erosion does not only occur in the East Coast states, but also occurs in the West Coast states, for example at Kampung Seri Menanti; Muar, Pantai Puteri; Tanjung Kling and Tanjung Bidara; Alor Gajah. This shows that coastal erosion projects that have swallowed hundreds of millions of ringgit have had little effect in addressing this coastal erosion problem. I would like to ask whether the Federal Government has issued a guideline and enforcement, specifically on development projects in coastal areas to be environmentally friendly, including relocating house sites to new areas far from the coastline?

Thank you, Honourable Member for Setiau. For the information of the Honourable Member for Setiau, I will read out here, the areas on the West Coast that...

Honourable Member for Setiu, not Setiau.

Sorry, Honourable Member for Setiu. Okay, Honourable Member for Setiu, yes. The areas on the West Coast mentioned, which have barriers or areas hit by eroded coastlines, namely: - Perlis at Bukit Putih, Kuala Perlis - highway, and Kuala Perlis. - Penang - Mak Minah, Juru, Bagan Ajam, Pantai Robina, Muara Sungai Kerian and Sungai Batu. - Negeri Sembilan - at Port Dickson. - Kedah - Kampung Tepi Sungai, Pulau Sayak. - Perak - Larut, Matang, Manjung and Hilir Perak. - Selangor - Sabak Bernam, Kuala Selangor, Klang and Kuala Langat. - Melaka - Alai Perdana, Teluk Mas, Pangkalan Balak and Kuala Linggi. - Johor at Batu Pahat and Pontian. The allocation, as I mentioned just now, is RM200 million. For advice or future planning, these coastlines are also involved with local authorities (PBT). However, the Department of Irrigation and Drainage (JPS) or the ministry, we have held many CSR projects for cooperation projects or awareness projects for the people, including what I mentioned just now regarding mangrove swamps. So from time to time the ministry will also hold a People-Friendly Programme to give information or advice or views, that is, educate people, with permission, to give a view that the problem of coastal erosion is not only caused by the waves but is local development. Possibly in terms of perhaps land reclamation in the areas where this will involve the PBT or local authorities, and we will also raise awareness among the authorities and also the people. So through CSR projects, we will provide cooperation to the people or, with permission, educate people. Thank you.

Hasan bin ArifinUMNO · BNRompin · questionEN

6. Dato' Sri Hasan bin Arifin [Rompin] asks the Minister of Economic Affairs to state that there are many complaints among consultants in the oil and gas industry that many still use consultants from abroad and do not give trust and opportunities to local consultants. State how many foreign consultants are still used by PETRONAS, and what their fields and expertise are.

Dato’ Seri Mohamed Azmin bin AliPKR · PHMinister of Economic Affairs · GombakEN

Mr Speaker, for the information of the Honourable Member for Rompin, PETRONAS, as a national oil company established under the Akta Kemajuan Petroleum 1974, is committed to helping advance the local oil and gas industry. PETRONAS's involvement in the upstream and downstream industry is estimated at 75 per cent of the entire industry in the country. For the period January to August 2019, local consultancy firms accounted for more than 60 per cent of the total number of consultancy firms appointed by PETRONAS. For work scopes that are too specific and technical, such as Engineering Procurement, Construction and Commisioning (EPCC), technology proprietary and digital, local expertise is very limited and must be obtained from external sources. For example, deep-sea seismic mapping technology is only owned by global companies, and this expertise is not owned by any local consultant or can be developed in a short time by PETRONAS itself. Furthermore, the work carried out by these foreign consultants requires high capital costs, is high-technology, complex and complicated because the oil and gas fields that exist now are in deep sea and have very high levels of contamination including CO2, sulphur and mercury.

Dato’ Seri Mohamed Azmin bin AliPKR · PHMinister of Economic Affairs · GombakEN

For the information of the Honourable Member, there are only four firms in the world that offer seismic deported acquisition services. PETRONAS appoints consultants or vendors from abroad to ensure the continuity of projects and that critical targets are achieved. To ensure more local vendors and consultants are actively and competitively involved in the oil and gas industry, various efforts, programmes and initiatives continue to be implemented by PETRONAS in cooperation with various ministries and agencies, such as the VDP and VDPx vendor development programmes, VDP Innovation and Technology, the BeyondHome sustainability programme, and the OGSE vendor financing programme or, with permission, Oil and Gas Services and Equipment Petronas. Under the PETRONAS VDP programme, a total of 108 companies have benefited from this, with contract value of approximately RM9 billion as of October 2019. Four bumiputera VDP companies have been listed on the main board of Bursa Malaysia, while 30 VDPs are already operating overseas. Mr Speaker, PETRONAS takes seriously the development of the capacity and capability of these local consultants. For example, when PETRONAS's oil and gas exploration and production activities are in Turkmenistan and Myanmar, local consultants have been involved together because the infrastructure and expertise of those countries are still limited, and this opens up opportunities for local consultants to explore new markets at the international level. Thank you.

Thank you, Honourable Minister. There are complaints among medium-sized companies that the vendor system has been terminated by PETRONAS. Secondly, is the same vendor system implemented by PETRONAS in the oil and gas sector overseas where PETRONAS has an interest in their investments?

For the information of the Honourable Member, this year alone we are continuing this effort by introducing another sustainability programme, namely to find solutions and help local companies in, firstly, ecosystem empowerment. This includes 14 initiatives, among them talent development and employment. Secondly, access to financing. We have Road to Bursa, fiscal incentives, Corporate Integrity Advocacy. These are among the efforts continued by PETRONAS to develop local consultancy companies.

The second question, as I have stated just now, when PETRONAS is given the opportunity to operate overseas, such as in Turkmenistan where PETRONAS has operated in Turkmenistan for 23 years, local consultancy companies are brought in together to be directly involved, and this gives them the opportunity to explore new opportunities not only within Malaysia but also at the international level. These efforts will continue. As I have stated just now, a total of 30 VDP companies among bumiputera have already operated overseas. For example, 17 companies have operated in Asia, eight VDP companies operate in the Middle East, two in North America, one in South America, one in South Africa and one in the United Kingdom. This proves that the vendor programme and initiatives carried out by PETRONAS have succeeded in developing local companies to operate at the international level. Thank you.

Thank you, Mr Speaker, and the Honourable Minister. Perhaps what I asked is a little different, but it is related to PETRONAS because I have no more opportunities. I have previously requested in this House that PETRONAS's annual return be tabled in the House for public knowledge. This is related to this question. Because transparency and integrity of PETRONAS may be related to the negotiations mentioned by the Honourable Minister. When can this PETRONAS annual return be tabled in this House? Thank you.

Mr Speaker, this question has no connection with the original question raised by the Honourable Member for Rompin. However, as a responsible government, I have already given a response to this matter. There is no question of PETRONAS not making a transparent and open presentation. Everything has been audited and we have submitted financial reports every year, and these can be accessed by Members of Parliament and the public. I believe the Honourable Member's proposal, as I have stated before, can be considered to ensure that transparency and accountability remain the main principles in the management of PETRONAS. Thank you.

Rusnah binti AluaiPKR · PHTangga Batu · questionEN

7. Puan Rusnah binti Aluai [Tangga Batu] asks the Minister of Human Resources to state whether the ministry will raise the retirement age to 65 years in the future, a step which is not optimal for the quality and expenditure of management.

Tuan M. KulasegaranDAP · PHMinister of Human Resources · Ipoh BaratEN

Thank you. The proposal to increase the retirement age limit to 65 years is a proposal we have received from NGOs and trade unions in Malaysia. Based on the Akta Umur Persaraan Minimum 2012, which came into force on 1 July 2013 on all private sector employers throughout Malaysia, stating that the minimum retirement age of an employee is when the employee reaches the age of 60 years. This means that an employee can continue working even after exceeding 60 years and also depends on the employment offer by the employer. Therefore, there is no need at this time to raise the retirement age to 65 years because this is the current government's view.

Puan Rusnah binti AluaiPKR · PHTangga BatuEN

Does the ministry have projections of outflows, meaning those retiring, and inflows, the new, of civil servants for the next five to 10 years? With the current retirement age, how many are not, with permission, fit for health reasons?

Tuan M. KulasegaranDAP · PHIpoh BaratEN

I need notice. I do not have those statistical figures. However, I can answer that many of those who retire do not have financial problems, but have health problems and so on. Therefore the projections and views from trade unions and so on are that they should work beyond 60 years.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

However, if we look across the whole world, there are countries that differ. For example in America it is about 65 years of retirement age. In Norway it is between 62 and 75 years. So, there are differences. However, if we have social security pension, it can help them. But not everyone enjoys this at the present time. However, government pensions can help them. The retirement figures and so on, I will provide in writing. Thank you.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Thank you, Mr Speaker. I would like to get an explanation. If we look at the record, among the countries that have succeeded in taking back those who have retired are Singapore and Japan, among the successful countries. Recently, in the last budget, the government offered incentives to private and government bodies that rehire retired workers for light work. I would like an explanation: up to now, what percentage of achievement has been taken advantage of by private agencies to rehire retired workers, those who have retired in the private sectors? Thank you.

Tuan M. KulasegaranDAP · PHIpoh BaratEN

Honourable Member, I will provide that figure in writing. However, what is important is that many of those who have retired and so on, we need to give priority to our young people. That is the first priority. Secondly, if there are vacancies and so on, we have instructed the Talent Corporation to negotiate with NGOs involved with those over 60 years old, so that they too can contribute to our national economy, so that they can also be absorbed in certain specific agencies. This is on condition that they have certain expertise. Because if they have such expertise, it would be a great loss if they simply retire. That is one of the new initiatives made. The current budget is only for graduates who have not worked for one year or more, or women and so on. However, the proposal for these retirees can be considered. Perhaps we need a little more time. Thank you.

Takiyuddin bin HassanPAS · PNKota Bharu · questionEN

8. Dato' Takiyuddin bin Hassan [Kota Bharu] asks the Prime Minister to state: (a) the list of members of the Special Committee on Commutation Study of the Mandatory Death Penalty to be established by the government; and (b) whether religious scholars such as muftis and the religious department are also involved in the establishment of the committee?

Tuan Mohamed Hanipa bin MaidinAMANAH · PHDeputy Minister in the Prime Minister's Department · SepangEN

Thank you to the Honourable Member for Kota Bharu. This question relates to the death penalty, yes. Mr Speaker, for the information of the Honourable Member for Kota Bharu, the government, as of 29 August 2019, has agreed that a Special Committee on the Commutation Study of the Mandatory Death Penalty be established to study comprehensively the sentencing policies, or in English, sentencing policies, to replace the mandatory death penalty with a more appropriate punishment subject to the discretion of the court. The membership composition of this Special Committee consists of experts in the field of law such as former Federal Court Judges, former Senior Federal Counsels, legal practitioners, law lecturers from leading public higher education institutions and research experts. For the information, among the committee members are chaired by Yang Berbahagia Tan Sri Datuk Seri Panglima Richard Malanjum, former Chief Justice of Malaysia; Yang Berbahagia Tan Sri Datin Paduka Zaharah binti Ibrahim, former Chief Judge of Malaya; Encik Edmund Bon Tai Soon from the Malaysian Centre for Constitutionalism and Human Rights, a lawyer; Encik Andrew Khoo Chin Hock from the Malaysian Bar Council, a lawyer; Yang Berbahagia Datin Paduka Zauyah Be binti T. Loth Khan, former officer of the Attorney General's Chambers; Encik Thang Ah Yong, former Senior Officer of the Malaysian Prison Department; Yang Berbahagia Dato' Mah Weng Kwai from the Human Rights Commission of Malaysia (SUHAKAM); Yang Berbahagia Dr Farah Nini binti Dato' Dusuki, Lecturer at Universiti Malaya; Yang Berbahagia Professor Madya Dato' Dr. P. Sundramoorthy, Criminologist at Universiti Sains Malaysia.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHDeputy Minister in the Prime Minister's Department · SepangEN

Mr Speaker, generally, religious scholars such as muftis, such as the State Islamic Religious Departments, are not directly involved in the establishment of this special committee. However, the establishment of this special committee is the government's commitment to ensure that the process of drafting this law is inclusive, holistic and effective by focusing on adequate engagement and outreach sessions. Therefore, the involvement of various levels of society including religious scholars such as muftis and the Islamic Religious Department, and to date this study has been through various platforms and the like- and will be given special attention so that the rights of individuals in expressing views are not sidelined. Accordingly, the proposal for implementing holistic engagement sessions will involve various parties such as state townhall sessions by zone that have already been implemented. Townhall sessions with Members of Parliament- I understand have also been implemented for some parties, perhaps- perhaps not all yet. Online public consultation, expert opinions, focus group discussions with experts, and meetings with families of victims and death row inmates. Thank you.

Dato’ Takiyuddin bin HassanPAS · PNKota BharuEN

Thank you, Mr Speaker. Thank you, Honourable Minister, for the answer. We know that when a criminal case involving death occurs, it cannot be denied that the party certain to suffer loss or damage is the family of the victim. My question is, does the committee established think about some form of compensation or damages to the victim who was killed, as in the Civil Law Act, bereavement, compensation for grief that exists in the current law, at least to ease the burden on them. The second question, when will this proposal be tabled in this Parliament? Thank you.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you to my friend the Honourable Member from Kota Bharu. A good question. Honourable Member, for the information of the Honourable Member about compensation or, in Arabic- diyah, in English called blood money. Honourable Member, I am not sure whether the Honourable Member is aware or not, there is actually a court decision in Muar, by the late Judge Richard Talalla. He once made a decision in that case, he gave compensation. Although there was a punishment, he gave compensation. We do not have a provision in the CPC. Honourable Member, a fairly senior lawyer, named Cik, a lawyer in Muar. He once commented- he also studied Islamic Law. So, I want to say to the Honourable Member about what the Honourable Member said, that is actually also a study taken into account by this committee, on whether we also take law from various jurisdictions, including Islamic law which indeed emphasises matters of diyah and so on. So, all of that will be taken into account in this committee. So, the Honourable Member said about this- the second, I do not remember.

Dato’ Takiyuddin bin HassanPAS · PNKota BharuEN

When will it be tabled in Parliament?

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Okay. I am informed, insya-Allah, for the information of the House, that all of this session will be completed by the end of this year. There is a time frame for it. If there are no obstacles, insya-Allah, it will be tabled next March, insya-Allah. Thank you.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Mr Speaker. Honourable Minister, Setiawangsa would like to ask: is the concept of changing from the mandatory death penalty, where we now give judges a choice depending on the facts of the case, more in line with the spirit of Islam itself? This is because if we look at Islamic law, there is also leeway given to judges, and it is not mandatory as in the existing civil punishments.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you to my friend from Setiawangsa. Indeed, in terms of Islamic law, I agree with the Honourable Member. There are actually three choices for the judge: whether to impose the death penalty, or to release the person outright, or to impose diyah or compensation. This is because it takes into account the- the death penalty is regarded as a family that becomes a grief party, with permission, so of course it involves taking into account the family members. That is from the perspective of Islamic legal philosophy. So, I think Honourable Member, what the Honourable Member said is indeed correct- in Islamic law that matter is indeed taken into account. So, I think that is why, in the committee chaired by Tan Sri Datuk Seri Panglima Richard Malanjum, these matters will be taken into account. This is because we want to ensure that the best law- perhaps one suited to the Malaysian mould- can be established, taking into account many various laws from Islam and also others. Thank you.

Thank you, Mr Speaker. My question is brief. Will this committee also conduct a study on legal practitioners, as well as our judicial institutions, in the context of how they view this law? I mean the areas where misuse or malpractice may occur at the level of the law. One aspect of the legal punishment itself, but what about in terms of empowering the judiciary and legal practitioners in relation to the mandatory death penalty? Thank you.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Honourable Member, as for this committee, it has its term of reference (TOR). If I may touch on it a little. Among their terms of reference are to review and study comprehensively the sentencing policies, or sentencing policies, based on the Cabinet's decision to replace the mandatory death penalty with punishments that are more appropriate and subject to the discretion of the court. To review and also study the implications of the moratorium, the implementation of execution sessions, to hold consultation sessions with various levels of society, and to analyse, project recommendations and reports for the improvement of alternative punishments to the death penalty.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

So those are among the terms of reference. As for what the Honourable Member has raised, it is possible; I am not sure whether this matter will be decided by the committee. However, Honourable Member, in the town hall session, many views were given, and the committee will listen to all of them and take all of them into account. Thank you.

[Question No. 9 – YB Tuan Kesavan A/L Subramaniam (Sungai Siput) was absent]

Abdul Latiff bin Abdul RahmanPAS · PNKuala Krai · questionEN

10. Tuan Abdul Latiff bin Abdul Rahman [Kuala Krai] asked the Minister of Youth and Sports to state: (a) how many youth organisations in Kuala Krai are active and inactive; and (b) what amount of allocations has been disbursed, and what courses can help produce youth leadership.

Tuan Syed Saddiq bin Syed Abdul RahmanMUDA · PHMinister of Youth and Sports · MuarEN

Thank you, Mr Speaker. Up until September 2019, a total of 492 youth organisations in the state of Kelantan were recorded as registered under the Youth Societies and Youth Development Act 2007. This registration involves a total of 47 youth organisations in the district of Kuala Krai, and three youth organisations in the district of Kuala Krai have had their registration cancelled by the Youth Societies Registration Office due to failure to comply with the requirements of section 22, Act 668 relating to the submission of Maklumat Yang Kena Diberi (MYKD).

Tuan Syed Saddiq bin Syed Abdul RahmanMUDA · PHMinister of Youth and Sports · MuarEN

Based on these statistics, 44 youth organisations in the district of Kuala Krai are categorised as still active. With regard to the provision of funds throughout Malaysia through the association fund, RM6.6 million has so far been allocated. Through the Sports Trust Fund, RM23.9 million has been allocated. If we add the amounts together, it is around RM30 million. To ensure that the administration of youth organisations can be improved, the ministry has also channelled assistance of RM3,000, specifically to youth organisations, in helping to implement the National Youth Consultative Council programme at district level in Kuala Krai. This is also related to the implementation of the Organisational Leadership Course (KPO), which aims to train and produce youth leaders among committee members and leadership successors of registered youth organisations. Thank you, Honourable Member.

Thank you, Honourable Minister. My supplementary question is, is there coordination within this ministry in distributing allocations among youth associations, especially after the Honourable Minister established the Youth Power Club (YPC), because at district or sub-district level, district or divisional youth councils already exist. Will the Honourable Minister, with the establishment of this YPC, which is- I am not sure whether it is the closest competitor to the Malaysian Youth Council (MBM), cause the youth to split into groups that are worrying for us? Thank you, Honourable Minister.

Thank you, Honourable Member. There are two matters here. YPC cannot replace MBM because MBM is the umbrella body. YPC is only one of the registered youth organisations. At the same time, all youth organisations must apply for funds according to the implementation of programmes, which will be audited every year. This is like the answer I gave to the second question earlier, where we are moving from an allocation system based on administrative money to programme implementation money. However, administrative money for the central organisation level will continue, because it is indeed needed, but at state and district levels it will be changed to programme implementation. The application method is quite simple. Firstly, we have shortened the time to apply. Previously, applications had to be made at least two months before the matter was approved, but now we are in the process of shortening it to one month. At the same time, it can also be applied for online, with permission, so that all parties can apply in a fairly easy manner. If they have implemented programmes at the grassroots level before, they will be given top priority, but at the same time the SOP has been changed, because we want to bring in non-conventional organisations too, so that they get the opportunity to apply, as well as influential individuals. For example, young people who can represent Malaysia at the international level, but previously could not apply in their individual capacity and had to go through NGOs, which now have a problem with cut money that has to be paid, or the percentage that has to be paid, which in the end was not channelled directly to that individual. Thank you, Honourable Member.

Nik Nazmi bin Nik AhmadPKR · PHSetiawangsa · questionEN

11. Tuan Nik Nazmi bin Nik Ahmad [Setiawangsa] asked the Minister of Human Resources to state: (a) what is the status of the MyAPEC YouthConnect and MyASEAN Internship programmes; and (b) whether the government is prepared to raise this programme to the standard of the VIE International Internship Programme, France.

Dato’ Mahfuz bin Haji OmarAMANAH · PHDeputy Minister of Human Resources · Pokok SenaEN

Thank you, Mr Speaker. Before that, I would like to welcome students from University of Cyberjaya (Cyberjaya University-College of Medical Sciences), numbering 87 people. Welcome.

Deputy Speaker (Mr Nga Kor Ming)EN

Welcome, please proceed.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Mr Speaker, for the information of the House, (a) the status of this programme continues until now, since 2015, and the participation obtained up until now, until 20 September 2019, is 458 young national talents who have joined and benefited through the Talent Mobility Programme, which was rebranded from the programme referred to in the Honourable Member's question just now. With the participation and support of more than 30 ministries, agencies and national industry players, and among them are MITI, Panasonic, BDO, Maybank Berhad, CIMB, AirAsia, Sime Darby, KPMG, UUM, Axiata, Intell, IBM and many more. Up until now, please note that we can only run this programme with Malaysian companies that have operations overseas. This is to give exposure to these young talents on global business thinking so that they are able to compete and be competitive with those who have succeeded at the world level. Regarding the question, (b) Whether we are prepared to raise this programme. We are always open if there is sufficient budget, because until now we are only able to provide return tickets to them and also the process of obtaining visas, which can be assisted by the government. Compared with what France has done in this programme since 2000, there are now already 70,000 participants, with the French Government itself providing allowances for those involved. France now has opened this to talent not only for France and French companies but also from companies in Europe. Thank you.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Honourable Deputy Minister. Setiawangsa takes note of the explanation regarding the success of talent mobility and also some constraints we face in achieving the standard of the VIE International Internship Programme, France. Setiawangsa seeks certainty, considering that we have rebranded this programme; previously it was named MyAPEC YouthConnect and MyASEAN Internship, so will this Talent Mobility Programme be expanded so that it is not limited to only APEC and ASEAN countries? This is because Setiawangsa thinks that in this way our country can gain more benefits from exposing our talents to wider countries.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Alright, thank you, Honourable Setiawangsa, a very good proposal has been put forward so that we can expand it, and indeed, insya-Allah, TalentCorp is always open to the opinions and views of the Honourable Member, and we will always update from time to time to ensure that our talents, the talents we have in our country, will receive wider exposure, insya-Allah.

Thank you, Mr Speaker. I would like to ask the Honourable Deputy Minister.

What benchmarks have been set to ensure this programme contributes to reducing youth unemployment, and how will this programme provide two-way benefits to local industry players, or is it more towards the participation of international companies alone, and what returns will our country obtain? Thank you.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Thank you to the Honourable Member. First of all, with regard to the advantages or benefits of implementing this programme, it is to increase the employability of local graduates with added value in line with the needs of the global talent workforce.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

These are among the things we can do. The second is implementing the Structured Internship Programme (SIP) led by TalentCorp in collaboration with the Ministry of Education, and under this SIP, graduates will get early exposure to the world of work before completing their studies. This is so that they are more competitive and possess skills that meet industry needs, and so far, a total of 76 thousand youths among university students and TVET trainees have benefited from this programme after we further improved these programmes.

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Mr Speaker, may I ask one more question?

Deputy Speaker (Mr Nga Kor Ming)EN

Yes, Honourable Kuala Kangsar. Please.

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Thank you, Mr Speaker. Honourable Minister, I would like to ask about the Perdana Corporate Fellow programme implemented under the management of the Ministry of Youth and Sports; the Minister is here. It appears able to add value to government-linked companies in terms of recruiting knowledgeable and insightful young talent, with permission, in terms of leadership. My question is, through the specific allocation in Budget 2020, will the ministry collaborate with the Ministry of Youth and Sports to identify potential young people from that programme to be absorbed as Administrative and Diplomatic Officers (PTD) in ministries, or placed in the offices of chief executives of multinational corporate companies in the country? Thank you.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

That is why in my answer earlier, we have already mentioned that we are working together with the various ministries involved in this cooperation and collaboration, and insya-Allah we will work together from time to time, including with the Ministry of Youth and Sports, to see where the best needs are for us to provide to our talents, insya-Allah.

Wan Hassan bin Mohd RamliPAS · PNDungun · questionEN

12. Tuan Haji Wan Hassan bin Mohd Ramli [Dungun] asked the Minister of Economic Affairs to state what steps the government is taking to narrow the gap between rich and poor states and the incomes of rural and urban residents, as outlined in the Shared Prosperity Vision.

Dato’ Seri Mohamed Azmin bin AliPKR · PHMinister of Economic Affairs · GombakEN

Mr Speaker, for the information of the Honourable Dungun, the government's focus is on ensuring balanced development is implemented across regions and states. It is important to ensure that every level of society can enjoy fair and equitable development, and that the well-being of all citizens is guaranteed based on the concept of shared prosperity, or, with permission, shared prosperity. The Shared Prosperity Vision (WKB) is a national agenda that will guide the country's direction more holistically for the period 2021 to 2030, to make Malaysia a country that continues to develop sustainably with equitable and fair economic distribution, inclusive across income groups, ethnicities, regions and supply chains.

Dato’ Seri Mohamed Azmin bin AliPKR · PHMinister of Economic Affairs · GombakEN

The implementation of WKB will be translated over a 10-year period in the Twelfth Malaysia Plan and the Thirteenth Malaysia Plan. The aim of WKB is to provide a decent standard of living, or, with permission, decent standard of living, to all Malaysians by 2030, by focusing on efforts to address wealth and income gaps across regions, including states, as well as rural and urban residents. This is important so that less developed states and groups of residents who have been left behind can be brought along in the nation's progress, their fate is protected and their economic capacity is strengthened. The second objective in WKB, namely addressing wealth and income gaps, focuses efforts on narrowing economic gaps between income classes, ethnicities, regions and supply chains. To address the economic gap between income groups, the government's focus is on creating high-value economic activities and high-income jobs that contribute to efforts to narrow the economic gap between income groups. In the context of the gap between regions, including states and urban and rural areas, the government is aware that the economic distribution gap in these areas is widening. Therefore, under the sixth strategic pillar of WKB, namely Regional Inclusiveness, economic hotspot mapping, with permission, economic hotspots, will be carried out to identify areas with potential as centres of sustainable economic activity. The selection of strategies for each designated location is based on the strengths and uniqueness of that area. Under the second strategic pillar, 15 key economic growth activity proposals have been identified. Among them are the digital economy and smart agriculture to expand and further invigorate economic activity across regions and states. [Mr Speaker took the Chair] Mr Speaker, the government is confident and believes that the government's efforts to narrow the development gap across regions and states, as well as between rural and urban residents, will be achieved through the implementation of this WKB. The related policies, strategies and action plans are being actively drafted by the Ministry of Economic Affairs and will be tabled in the Twelfth Malaysia Plan next year. Thank you.

Thank you, Mr Speaker, and thank you to the Honourable Minister for the answer given. We have gone through four national vision policies. The first was the New Economic Policy, then the National Development Policy, then the National Vision Policy which involved the last one, Vision 2020. So, is there already a record and also databases to be a priority for the Honourable Minister in making an assessment to resolve the gap between states and also the people in urban and rural areas? Thank you, Mr Speaker.

Thank you, Honourable Dungun. We are aware that the country has introduced several policies to develop Malaysia, as mentioned earlier: the New Economic Policy, the National Development Policy and Vision 2020. However, whatever vision or policy is presented, it is a projection and a plan for a set period of time. Unfortunately, we find that the aims and goals of Vision 2020 could not be achieved within the year ahead. Nevertheless, we also acknowledge that several achievements have been made throughout the implementation period of the policies we have just analysed. Therefore, to ensure that the Government's intention and the people's aspiration to see the wealth and prosperity of the nation shared fairly and equitably, we must revise or review these projections and set a new target by 2030, ensuring that rural development is given priority, because after 60 years of our nation's independence, we still see levels of poverty that need attention in several areas, not only in states but also at the district level.

Sometimes within a state, there is also a large gap between one district and another that needs attention. Therefore, among the goals I outlined earlier, we are not only looking at efforts to narrow the gap between state and state, but also between rural and urban areas, between district and district, between region and region, and also the income gap. The figures mentioned by the Honourable Dungun earlier, we do have. Therefore, based on these figures and the achievements we have made, we need to review again so that the WKB aspiration can be achieved within the stipulated period. We are confident that this time, within 10 years, this goal can be implemented with the participation and response of the people. As mentioned by the Right Honourable Prime Minister, there is no point in offering a good policy if it does not receive participation from all stakeholders in the country, including the people and the business community. So, I hope this policy can be implemented immediately. Tomorrow I will meet with the senior government officers at the Federal and state levels, because members of the civil service are a very important stakeholder, the backbone of the government, in ensuring that this policy can be translated into programmes and initiatives throughout the country.

So I believe that tomorrow morning's meeting with government officers at the Federal and state levels, arranged by the Federal Government, can provide clarity, and we can collectively work together to develop the nation and bring prosperity to all. Thank you.

Thank you, Mr Speaker. To achieve this Shared Prosperity Vision policy, has the Government conducted a study on how to balance economic development between regions, and also between urban and rural areas? Earlier, the Honourable Member mentioned the participation of all the parties involved, which includes target groups and stakeholders. Apart from the government officers at the Federal and state levels, what further action will be taken to enable those who are the target group, especially in rural areas, to also have their views and participation taken into account? Thank you.

Thank you, Honourable Beaufort. I welcome the proposal given by the Honourable Member. As I stated at the outset, among the steps we will take is to translate the WKB into the implementation of the Twelfth Malaysia Plan, which we will table in Parliament at the end of next year. To table the Twelfth Malaysia Plan, we have begun a consultation session with stakeholders not only at the Federal level but also at the state level, including civil society, the business community and also those among minority groups, so that this feedback can be incorporated into the Twelfth Malaysia Plan, in line with the aspiration and goals of the WKB. Previously, the five-year Malaysia plan was usually formulated at the Federal level. However, I have taken the stance of obtaining input from state leadership, including states not under the administration of Pakatan Harapan. This is because I feel that state governments have their own list of priorities to share with the Federal Government, so that the implementation of these projects and programmes can run smoothly and in an orderly manner, to bring welfare to the people in the states concerned. Thank you.

Datuk Dr. Jeffrey KitinganSTAR · GRSKeningauEN

Mr Speaker.

Mr SpeakerEN

Thank you, Honourable Minister...

Mr Speaker, may I ask one supplementary question?

Mr Speaker

Baiklah, silakan.

Thank you, Mr Speaker. Honourable Minister, what specific obstacles has the ministry identified for the Government in implementing programmes to bridge this poverty gap so that they can be achieved? What major projects have been identified that have a significant impact on the people, so that the people have more employment opportunities in our country? Thank you, Mr Speaker.

Thank you, Honourable Kuala Krau. I believe the Honourable Kuala Krau is also aware that among today's global challenges is the approach of new technologies, which demands that we, especially the younger generation, quickly embrace these technologies and translate them into our efforts to increase productivity and output for the country and also for their respective families. If we still adopt old approaches and use traditional methods, we will fall far behind in competition at the regional and global levels. This is among our challenges, which is why the Government, in Budget 2020, allocated a very large sum to train our children in the TVET field and to hone their talents and abilities, so that these young people who are more inclined towards these new technologies can quickly meet the demands of industry and the global economy today. The second challenge is how we can develop a society that wants to see these new approaches to increasing productivity expedited. Among the steps we have taken is to hold direct discussions with FELDA settlers, FELCRA participants and RISDA smallholders, because they are among the most important groups that have contributed to the country's economy in the past, in the commodity industry, especially rubber and oil palm. Our proposal is whether these settlers and participants wish to remain at their existing level, or whether the new generation of FELDA, FELCRA and RISDA is ready to embrace new technologies to manage their estates. If this understanding can be reached, I believe all parties will obtain better results and increase their respective productivity. I believe that with the initiatives we have introduced under the WKB, including the Twelfth Malaysia Plan, we can meet the goals we hope for, God willing. Thank you.

Mr SpeakerEN

Thank you, Honourable Minister. That concludes the Oral Question session. Next, the motion under Standing Order 12(1). [Time for Oral Questions has ended]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Datuk Liew Vui KeongWARISANMinister in the Prime Minister's Department · Batu SapiEN

Mr Speaker, I beg to move: "That, pursuant to Standing Order 12(1), the sitting of the House today shall not be adjourned until the motion of the Minister in the Prime Minister's Department at No. 1 on the Order Paper has been fully debated and decided, and during the Committee stage of the Ministry of Water, Land and Natural Resources and the Ministry of Rural Development for the Appropriation Bill 2020 and the Development Expenditure Estimates 2020, and thereafter the sitting of the House shall be adjourned until 10 a.m. on Thursday, 14 November 2019."

Tuan Mohamed Hanipa bin MaidinAMANAH · PHDeputy Minister in the Prime Minister's Department · Sepang

Saya menyokong.

Mr SpeakerEN

Honourable Members, I now put the question to the House for decision. The question is that the motion as moved just now be agreed to.

[Motion moved and agreed to]

Minister's Motion in the Prime Minister's Department under S.O. 27(3) — Extension of Date for Tabling of Statement by the Special Select Committee to Consider the Independent Police Complaints and Misconduct Commission Bill 2019Bill

Datuk Liew Vui KeongWARISANMinister in the Prime Minister's Department · Batu SapiEN

Thank you, Mr Speaker.

Speaker. Mr Speaker, I request to proposeEN

"That this House resolves that the Select Committee on Scrutiny of Bills, pursuant to the resolution made by the House on Monday, 7 October 2019, shall scrutinise the Police Misconduct Independent Complaints Commission Bill 2019 and present a report containing proposed improvements to the said Bill to this House no later than 18 November this year; "That the Select Committee on Scrutiny of Bills requires more time to enable this Committee to examine the matters of public concern more thoroughly and in greater depth before preparing and presenting its report to this House; and "That the House resolves to extend the date for this Select Committee to present a report containing proposed improvements to the said Bill to this House no later than Monday, 25 November 2019." Mr Speaker, I beg to move.

Mr SpeakerEN

Seconded? Is there a seconder?

Tuan Mohamed Hanipa bin MaidinAMANAH · PHDeputy Minister in the Prime Minister's Department · Sepang

Saya menyokong.

Mr SpeakerEN

Honourable Members, I now put the question to the House for decision. The question is that the motion as moved by the Honourable Minister in the Prime Minister's Department under item 1 just now be agreed to.

[Motion moved and agreed to]

Bill — Supply Bill 2020 and Development Estimates Motion 2020 CommitteeBill

The Order Paper was read to resume consideration of the "Appropriation Bill 2020 and Development Estimates 2020 in the Committee of Supply of the House." [Sixth Day]

[The House resolved into Committee] [Mr Speaker presided over the Committee]

Mr ChairmanEN

As usual, Honourable Members, I wish to inform you that today the debate at the Committee stage on the Appropriation Bill 2020 is for the Ministry of Water, Land and Natural Resources and the Ministry of Rural Development, two ministries. The time limit for debate at the Committee stage of this Appropriation Bill 2020 is likewise, as usual, limited to 10 minutes only for each Honourable Member to debate. Subject to time, we will reduce it to five minutes if there are too many people wishing to debate. Thank you. The time allocated for the Honourable Minister to reply is also, as usual, within 60 minutes.

Bill — Supply Bill 2020 and Development Estimates Motion 2020 Committee — Head B.23 [Schedule] - Head P.23 [Development Estimates 2020] -Bill

Mr ChairmanEN

Supply Head B.23 and Development Head P.23 under the Ministry of Water, Land and Natural Resources are open for debate. I invite the Honourable Rembau.

Thank you, Mr Chairman. I touch on Development Head, Item 030000 – Forest and Biodiversity Management. Under the previous government, we established the Central Forest Spine – CSF Master Plan in 2005 to form a protected forest network connected through the establishment of 10 ecological corridors for the conservation and restoration of wildlife biodiversity and the environment. This is very much needed given that the total forest area in Peninsular Malaysia has decreased significantly, and the CSF is also a water catchment centre for more than 90 per cent of the population in Peninsular Malaysia. Moreover, we see thousands of wildlife killed while crossing highways, which is why we established these ecological corridors. We also established the National Biodiversity Policy – National Biodiversity Plan for 2016–2025. I would like to ask the Honourable Minister, what is the current progress of the Central Forest Spine Master Plan, as well as the National Biodiversity Plan? This is because the issue of deaths of various wildlife, especially due to accidents on highways, is increasingly being reported. In addition, the Inspector-General of Police last month issued a statement that there are prominent persons, VVIPs, who are masterminds and are involved in wildlife poaching activities. I congratulate the Department of Wildlife and National Parks (PERHILITAN) and the police because recently, in Operation Bersepadu Khazanah, as many as 47 illegal poachers were arrested. I also take note that the Minister previously stated that the Wildlife Conservation Act 2010 will be amended to address the problem of illegal poaching by introducing mandatory prison sentences. So, I would like to ask the Honourable Minister, when is the amendment to the Act expected to be made? How confident is the ministry that this amendment will truly curb the problem that exists at present? And also, what are the enforcement plans, similar to the success of Operation Bersepadu Khazanah, to ensure that these illegal poachers, especially those coming from abroad, can be taken action against, together with the syndicates and such groups?

Item for the purpose of Item 040000 – Water Development. Last September, the Honourable Minister announced that the new water tariff rates in all states would be announced at the end of this year after obtaining approval from the Cabinet. The determination of these new rates is through the water tariff mechanism, namely the Tariff Setting Mechanism – TSM, implemented by SPAN, the National Water Services Commission, involving proposed increases of between 6 sen and 71 sen for every thousand litres of consumption. Has the proposed increase received the final decision from the Cabinet? If the Cabinet has agreed, what is the final tariff rate set for each state according to domestic and industrial types of consumption? What is certain is that we are very much looking forward to this water tariff increase, and we want to know whether a final decision has been made by the Cabinet. Item for the purpose of Item 020200 – Malaysia Survey and Mapping. At present, Malaysia has finalised its maritime boundary and international waters spanning 3,990 kilometres. However, this measurement and mapping only involve Malaysia's boundaries with other countries. At present, Malaysia still does not have a finalised maritime boundary or inter-state waters within Malaysia. This is also the reason used by the Federal Government when the payment of oil royalties for several states could not be fulfilled. Previously, the Honourable Minister of Economic Affairs stated that oil royalty payments from 10 oil production fields would not be paid to Kelantan, Terengganu and Pahang as long as the Government has not been able to determine the demarcation of waters between the three states concerned. This is a statement from the Honourable Minister of Economic Affairs. Following that, does the ministry have any plans to carry out mapping of water boundaries in the near future to overcome the existing issue, so that matters relating to the claim for royalties can be fully resolved? I believe that a continuing issue will only cause the same matters to keep recurring in the future, as if there is no end to this royalty issue. I hope that one of the reasons given, namely the water boundary between states, can be resolved, and perhaps the Honourable Minister can provide an explanation on this matter. International land boundaries. For the international land boundaries with which Malaysia directly borders Brunei, Indonesia and Thailand, a total of 74 per cent or 2,431 kilometres out of the overall 3,257 kilometres of land length has been successfully finalised. The remainder, which is around 826 kilometres involving nine areas, is still in the process of negotiation due to territorial claims between the countries concerned. The Government needs to finalise these international boundaries immediately, because they involve security factors and also jurisdiction issues, with permission, enforcement and related agencies, including matters relating to immigration, intrusion and monitoring of smuggling activities. Has the ministry established a timeline to resolve the overlapping claims between the countries involved, and are there any land territories that require Malaysia and the countries involved to settle these claims at the Permanent Court of Arbitration, as we have brought several cases of overlapping territories in our sea and maritime areas? Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, Honourable Rembau. Now I invite the Honourable Bandar Kuching. Please proceed.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

Thank you, Mr Chairman. I will not take up much time, I only have a few matters. First, I would like to touch on Item 14500 – Upgrading Urban Infrastructure and Drainage, Flood Mitigation, and Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

I actually want to ask about the status of the PSLB Project on the Sarawak River. I would like to thank the ministry for allocating RM150 million for this mitigation project involving nine areas within the Kuching City Council area. However, I would like to ask again about the existing timeline, because I have been told – I have met the DID and was given a briefing in which they said that this month, November 2019, a consultant appointment process would be completed. So I would like to ask, has that appointment been made? In addition, the plan and design work, survey work, and land acquisition, all will be carried out starting next year until March 2021. Only after that can the physical work be carried out. I would like to ask, can this process be expedited? What steps can the ministry take to ensure that there are no further delays. Do not, do not, do not, do not delay, because the people of Sarawak in my area have been waiting for this project to address the chronic flash-flood problem, including at the Sarawak General Hospital. We all know that the PSLB project cannot solve all the flash-flood problems in Kuching City, and what is more needed is to complete the RTB project throughout Kuching City. I am informed there are still six kilometres of river that must undergo this mitigation project.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

So I hope that perhaps in the next Malaysia Plan, allocations can be further increased to cover places such as Happy Valley, Desa Wira, Sungai Maong Kanan and Sungai Maong Kiri, which will help the Laksamana Cheng Ho area and also Iris Garden. Thank you. Besides that, Item 29000 – Sarawak Water Supply Scheme. I see here there is an increase of about RM40 million through loans. So I would like to ask in detail: how will this allocation be carried out? Which places have been identified for this project? Also, how is the collaboration with the state government to identify the issues that need to be addressed and the places where this project should be carried out? That is all, thank you.

Mr ChairmanEN

Thank you, Honourable Member for Bandar Kuching. Now I invite the Honourable Member for Kubang Kerian.

Dato' Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman, for the opportunity to take part in the Budget debate at the Committee stage for the Ministry of Water, Land and Natural Resources. I would like to refer directly to Item 030000 – Forest Management and Biodiversity. Mr Chairman, I would like to seek clarification from the Ministry regarding the annual logging quota for Permanent Reserved Forests in Peninsular Malaysia. Based on that logging quota, I ask the Ministry to explain the logging limits that have been carried out by states across Malaysia during the RMKe-11 period. I also want to seek clarification regarding states that have succeeded in maintaining the MS ISO 9001 certification. Here I would like to record my appreciation and congratulations to the Kelantan State Government in particular, which has succeeded in controlling the forest logging limit as allocated. If we look at the reports we have, it is found that Kelantan has succeeded in controlling forest logging within the permitted limit. Therefore, perhaps we could get an explanation regarding all states that have succeeded in following the forest logging standard limits that have been set. Secondly, Item 040000 – Water Development. I would like to get details on the statistics of each state that is experiencing problems with the treated water supply reserve margin. We find that we have large water reserves. What I mentioned in the debate yesterday, for example, concerns the Kenyir Dam, which has a very large water resource that is not utilised to the maximum possible.

Dato' Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

I think a mechanism needs to be examined or found on how we can utilise such a large water resource. Whether we can sell it to foreign countries, including Singapore and other neighbouring countries, or we utilise such a large amount of water ourselves. At the same time, we find the issue of several states facing flood problems. I think perhaps I should once again request the Ministry to seriously consider the flood issue occurring in Kelantan. Many times in this House we have put forward proposals that a feasibility study be expedited for building water dams in Kelantan to store water, particularly in the Sungai Lebir. I think that if we go by the study, it could solve almost half of the flood problems occurring in Kelantan. Mr Chairman, I also want to refer to the issue concerning Item 030400 – Forest Research Institute Malaysia (FRIM). We would like to get an explanation: up to now, how much forest has been logged and replanted? Because if we look, the Permanent Reserved Forests in Malaysia, as mentioned by several Honourable Members such as the Honourable Member for Rembau and others just now, most of our forests have already been logged. There needs to be control over this forest logging, and action must be taken against any state that violates the logging limit. At the same time, states that already have reserves, for example Pahang, Kelantan and Terengganu, have national park reserves which mean they cannot extract forest produce because their areas have been gazetted as forest or national parks. My question is: what is the Federal Government's mechanism for compensating states that cannot extract produce because they are gazetted as national parks? I think Kelantan, Pahang and Terengganu are among the states that have lost many sources of revenue because of these national park reserves. Mr Chairman, I also want to refer to Item 030200 – Wildlife Protection and National Parks. Recently the nation was shocked by an arrest incident by the Forest Rangers. Thirty people who went in, they had picnicked in a forest area in Jerantut. Their vehicles were seized and they were charged because they did not have a permit to enter. I welcome that action, but we must remember that at the same time, our people are now facing the problem of having no comfortable recreational areas, and they go- the ones arrested were villagers living in the surrounding area. They went with their families to picnic in the forest area where the waterfalls and river water are clear. What we find is that outside, the problem is big. We cannot find clear water. They only picnic in that area. We admit that to pay for a permit, a vehicle entering is charged RM100, and each person is charged, I understand, RM10 per person. This becomes a burden for them to get a permit just to enter, picnic, bathe and then leave, but they were stopped. I think a space should be given to our people from Kuala Lumpur, from the cities, who sometimes go with their families to picnic in areas that are indeed forest reserves, we admit. That is why it is the clean water source that still remains. I also want to refer to Item 08601 – Planting of Mangroves and Suitable Species along the Coastline (JPSM). I think a mechanism or an Act needs to be made so that mangrove forests are indeed made into areas that may not be logged at all, especially in coastal areas. Apart from controlling the issue of erosion, it also controls the issue of the security of the nation's defence line. We regret that in some coastal areas, mangrove forests have been cleared and turned into recreational fields, golf courses and so on, and we find that this has become a threat to the nation's biodiversity. I also want to refer to Item 20000 – Kelantan State Water Supply Scheme. I see in this report that in 2019, RM8.7 million was allocated, but in 2020 only RM1 million.

Dato' Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

A very large reduction, whereas the issue occurring in Kelantan is this water problem that is often raised. I think this budget needs to be looked at again so that a mechanism can be found to give priority to states facing water problems and so on. I also want to refer to Item 15400 – Environmentally Friendly Drainage River Management Scheme. In particular, the Kubang Kerian area: in my monitoring, I found that many rivers have already been overgrown with trees, the river water is not flowing, and it becomes a problem when the monsoon season comes. In relation to this scheme, I see that there is a need for the Irrigation and Drainage Department to pay attention to the main rivers, where more and more trees are growing by the day, and there is a need for these rivers to be cleaned.

Dato' Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Mr Chairman, one thing that also surprised me in this report is the difference for some states regarding the State Water Supply Scheme. For example, the state of Terengganu, in 2019 was allocated RM300 thousand but next year it is zero. Several states are zero, including Sarawak. And this I think is one- I find it strange because Sarawak also faces water problems. Sabah and Sarawak face serious water problems, but the allocation given to the state water supply is non-existent, zero. Compared with 2019, RM80 million was allocated. Mr Chairman, finally, I also want to touch on the matter of control over- Item 040100 – Water Management. Regarding the major issue occurring in every state, we find the major cause is water that is not sold, which requires a large allocation. I refer to the case in Kelantan. Many old pipes need to be replaced. Indeed the state cannot afford to allocate such a large amount, and an allocation needs to be considered to replace the old pipes so that leakage and water wastage can be curbed, and residents receive a proper water supply. Mr Chairman, I think those are some of the matters I wanted to raise. Thank you.

Mr ChairmanEN

Thank you, Honourable Member for Kubang Kerian. Now I invite the Honourable Member for Segamat.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

Thank you, Mr Chairman. Referring to Supply Resolution 23, Item 020100 Federal Director General of Lands and Mines Department (JKPTG). Where I find there is an increase of almost RM30 million. I congratulate them. But at the same time I would also like to ask the Honourable Minister in particular about flood mitigation projects. I find that there is insufficient funding for Sungai Siput in Jementah, Segamat. I hope it will be included in the Twelfth Malaysia Plan, Rolling Plan 1. Item 020200 – Malaysia Survey and Mapping. I find- I also welcome the increase of almost RM30 million. However, is it adequate, because I find that sometimes projects such as- sometimes school developments are delayed because the Survey and Mapping Department is busy and so on, which means sometimes it takes more than a year, almost two years, for them to survey the land itself. For example, the Jementah, Sungai Muar National-Type Chinese School Project, where the Ministry has already bought four acres of land and has already approved it and so on. However, we are waiting for the department concerned to carry out its responsibilities. I hope the Honourable Minister himself will pay some attention to this, to ask the department concerned in the state of Johor to speed it up. Regarding Item 020400 - Irrigation and Drainage. This is about the flood problem. I would like to take this opportunity to also thank the Honourable Minister because the state JPS has already approved almost RM1 million to solve the problem of drains passing through rivers. If it is not done, it can only be used during the time of- water polo games only.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

However, thank you because after a long time the Honourable Minister has approved through the state JPS. What is good I say is good, and what must be improved, I will say must be improved. Item 14500 - Urban Infrastructure and Drainage Upgrading, Flood Mitigation. What I read regarding the earlier matter, I also take this opportunity- and I also heard a lot from the Honourable Member for Rantau Panjang, and our relatives from Kelantan. They have a big problem. I am confident that the Honourable Minister will also bring this matter together with the RTS problem in Sungai Siput, Segamat just now. Item 15300 - River Mouth Dredging. Here I want to touch a little on the licences issued by the Ministry, where I hope this will be done fairly, openly and also with transparency to avoid slander from third parties, from the emergence of corruption, abuse of power or favouritism and so on. We must set an example to everyone. Item 16700 - Flood Mitigation Scheme (RTB) and Urban Drainage. I have also touched on this earlier. Item 06400 - Johor State Water Supply Scheme. I find- depending on the estimate of past projects, at this time only RM50 million is given- I think perhaps because the project is nearly complete and so on. Or in the final phase. However, I want to record that this increase is one that is like almost- very very small. At the same time I also want to record for the people of Johor that as the Member of Parliament for Segamat, I do not agree for the Ministry to raise water tariffs for the state of Johor because at present the state of Johor pays the highest, almost RM1.60. So if it is for an increase for the state of Johor, then it is requested that other states also be brought to the same level. The Honourable Minister himself stated in the MQT yesterday- at length that the Singapore Government buys water cheaply, it buys from Johor, surely Johor should not pay so much. So, I think as a Johorean it is my responsibility to bring this to the Ministry so that the Ministry will think deeply before making a decision on an increase. I am confident the Honourable Member for Ayer Hitam will also agree, we are both Johoreans, it is our responsibility to fight for the rights of the people of the state of Johor. The water problem also- we find, for example, in the village of Kampung Paya, Gelang Cincin and so on, which falls under the DUN Buluh Kasap. We find that often during the monsoon season it floods. However, during festive seasons such as Hari Raya, there is no water, so it has to be supplied. This has not only happened now, it has been almost 20 years that it has been happening, and there is also a madrasah where we find there has been no water up until now, it must be provided. So, I appeal to the Honourable Minister to make an out-of-the-box think, on how we can solve this problem. This is because I am confident it is only a matter of thinking power and also commitment to solve the problem. This is because the Kampung Paya treatment plant will be completed soon, although this is behind schedule...

[Bangun]

Dato' Seri Dr. SantharaPKR · PHSegamatEN

I give way to the Honourable Member for Pendang.

Tuan Haji Awang bin HashimPAS · PNPendangEN

Thank you, Mr Chairman, and thank you, Honourable Member for Segamat. Just now, regarding the water that we supply to Singapore from Johor. So, we want to ask the Ministry concerned. Can the state of Johor only sell water to Singapore for Singapore's use? We do not need to buy it back, for us- for the use of the state of Johor, we process it ourselves, we build that processing facility and we sell it. This will be able to reduce somewhat our savings in terms of water use and we can also reduce the outflow of payment money. This is because we buy water from Singapore, the water that we process in Singapore is bought back. Why do we not process it ourselves for our own use? That is all, I seek views.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

I ask that it be included as part of my speech. It is a good proposal. But unfortunately the previous government, when we had the opportunity to correct this contract in the 80s, did not do so. I do not know why they did not do it, but I do not want- I will leave it to the Honourable Minister to answer...

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

May I ask for clarification, Honourable Member?

Dato' Seri Dr. SantharaPKR · PHSegamatEN

Yes, Honourable Member for Ayer Hitam.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Honourable Member, as far as I know, in 1987, at that time under the Fourth Prime Minister, namely the Right Honourable Langkawi, and it was he who made the decision not- okay, to raise the rate. So what is the Honourable Member's view and explanation, because the Fourth PM is also the Seventh PM. Thank you.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

That is God's gift- the Fourth PM, the Seventh PM, the best for Malaysia. However, at the same time, at that time the Fourth PM made the decision as Chairman of Barisan Nasional. The purpose was after discussion with the Cabinet, which was mostly the Barisan Nasional Cabinet. However, at present, when he is the Prime Minister and also the Chairman of Pakatan Harapan, sitting together with the Pakatan Harapan Cabinet, the way of thinking is to solve the problem...

[Dewan riuh]

Dato' Seri Dr. SantharaPKR · PHSegamatEN

What is good we refine. I do not blame- what is good we refine...

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Honourable Member, look at what the Singapore Parliament said, all of it was done by the Right Honourable Langkawi, okay. It is he who must be questioned. Legally too, that period has already lapsed. Okay, thank you.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

Honourable Member for Ayer Hitam, I understand, we both like...

The Honourable Member for Ayer Hitam should contest over there.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

We both like Singapore, but at the same time, although I am a strong supporter of Singapore, I say many good things, look at Singapore, education and so on, but on this water issue, I am confident Singapore must be reasonable, because when there is a lopsided agreement, sometimes although they hold the upper position, they must understand the interests of the Johor people, and so on, they must think again, but it is not wrong. Many agreements in corporations, sometimes when we take over, the agreement already exists. So we must discuss. There are some that can be challenged in court, but if they cannot be challenged in court, then we must discuss, we must persuade. These are merit matters, and perhaps there are some where we give and we receive back.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

This is a political technique. I am sure the Honourable Langkawi is an expert in this field, so I will not touch on it. I will leave it to the Honourable Minister himself to answer. It is not fair. He is the Honourable Minister, so surely I cannot answer on his behalf, but since..

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Okay, okay, okay.

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

Thank you. I would therefore like to thank the Chairman for giving me the opportunity to take part in the debate at this Committee stage. I am returning 1 minute 20 seconds. Thank you.

Mr ChairmanEN

Thank you, Honourable Segamat. Next I invite the Honourable Kota Tinggi. Please.

Cool, cool, cool, Honourable Segamat, cool. Always cool, but today is a little different. Thank you, Mr Chairman...

Dato’ Haji Salim SharifUMNO · BNJempolEN

Mah, fix your tudung a little, Mah. Tudung, tudung...

I ask my colleagues to please not disturb me... I would like to refer to the Honourable Minister. Thank you. Today the Honourable Minister has come, and I have indeed been waiting for the Honourable Minister. I would like to refer to Item 06400. I also do not know under which item to place this, Honourable Minister. So I see the Johor State Water Supply Scheme. The Honourable Minister fully understands the problem I want to raise. So, Mr Chairman, I would like to inform you that this is the problem of water supply disruption experienced in my area. It involves three schemes, three FELDA schemes in the Lok Heng Cluster, three FELDA schemes in the Waha Cluster, two FELDA schemes in the Aping Cluster, and nineteen villages, Honourable Minister. The issue is the Lok Heng water treatment plant, the raw water intake at Sungai Sedili Kecil, which has 4,004 consumer accounts. The state government has built three tube wells, but they only reach 0.9 mmld, million metres per day, whereas the actual requirement is 6 mmld. What I hope for, the issue that follows, is that there are two water plants, Honourable Minister. The Chairman of SPAN has already come down. I thank the Honourable Member from the Klang area, because the Chairman of SPAN has come down, and I believe the Honourable Minister has instructed him to come down and look at this issue, and he has indeed come down. So there are two water plants involved. The Lok Heng water plant supplies water to the Lok Heng FELDA Cluster and affects 4,004 consumer accounts, which I mentioned to the Honourable Minister just now. Meanwhile, the Sungai Gembut water plant supplies water to FELDA Aping Barat, Aping Timur, Kampung Gembut Cina, Bandar Seri Perani, Sedili Kecil, Kampung Mawai, Kampung Gembut, Kampung Sayang and Kampung Teluk, and it affects a total of 6,041 consumer accounts. Recently, Honourable Minister, as I mentioned earlier, the state government allocated approximately RM500 thousand to build three tube wells at FELDA Lok Heng Selatan, but it is not sufficient for the needs it requires. So I hope, Mr Chairman, that the Honourable Minister can help me, Honourable Minister. I pity my people. This problem has apparently existed for a long time. I am new in this area, and this problem has been prolonged, that is the first point. Secondly, Mr Chairman, regarding Item 14500, Flood Mitigation in Bandar Kota Tinggi. This concerns the problem of flash floods that always occur at Batu Tiga Jalan Mawai, at Batu Satu Jalan Mawai, and at Taman Aman Jalan Lukut. The cause is the shallowness of Sungai Pemandi. Sungai Pemandi is shallow, and when this happens it causes a large flow of water over the road. For this too, I humbly ask the Honourable Minister to help me. Next, Mr Chairman, Item 13500, Dredging of River Mouths. My issue, Honourable Minister, is that the mouth of Sungai Sedili Besar ends in the South China Sea, and this river is also a main route for the movement in and out of not only sea fishermen but also vessels of enforcement agencies such as LKIM, APMM and so on. So what I hope from the Honourable Minister is that this river can be assisted in being managed so that its upstream area will indirectly facilitate the movement of my sea fishermen and also the enforcement agencies I mentioned earlier. Finally, Mr Chairman...

[Dewan riuh]

I have another 5 minutes. Item 14500, Upgrading of Urban Infrastructure and Drainage for Flood Mitigation. I thank the ministry for having built a dam in 2013 near the PUB water plant at Kampung Panti, but it has caused the frequency of flash floods to increase every time there is a high tide, and furthermore Kota Tinggi is abundant in rainwater whenever it rains heavily.

This area is frequently hit by floods, for example at Jalan Niaga Utama, which houses many traders in the Muafakat Kota Tinggi stalls and so on, and also at the traffic light junction. So I hope the Honourable Minister can help me to build, perhaps, an automatic floodgate, an automatic tidal gate, at Sungai Bang and also at Pam Sam located at Jalan Niaga. I thank you, Mr Chairman. That is me. Thank you, Honourable Minister.

Mr ChairmanEN

Thank you, Honourable Kota Tinggi. Now I invite the Honourable Kota Kinabalu, who submitted a request earlier.

Tuan Chan Foong HinDAP · PHKota KinabaluEN

Thank you, Mr Chairman. I would like to refer to Item 13400, Water Resources Development, Item 14500, Upgrading of Urban Infrastructure and Drainage for Flood Mitigation, and Item 14600, Pre-Feasibility Study. For the items above, I would like to raise the proposals to build a dam in Tawau and a dam in Papar. These two dam proposals are water resource development projects proposed in Sabah. The question now is, is the construction of dams necessary? In my view, it depends on the situation and needs. The government should build dams if the situation of water supply continuity is very problematic. For example, in Tawau, I strongly agree that a dam should be built because in the dry season the river water level is very low, to the extent that water rationing is necessary, but during the monsoon season the river water is too much, overflowing the riverbanks and causing floods in the Bandar Tawau area. This is a rather extreme situation, and here I would like to urge the government to expedite the construction of a water dam at Gudang Empat in Tawau, Cinta Mata, to resolve two problems, namely the flood problem and the water shortage faced by the areas around the Tawau District, including Bandar Tawau, Palong and Apas. During the monsoon season, flash floods frequently occur due to two main factors, namely heavy rain coinciding with high tide from the river, causing the water level to rise. Many victims of these flash floods, including those that occurred in Kalabakan. Meanwhile, in the dry season, I have been informed that the water supply in the Tawau District during the dry season is as low as 16 million litres a day, which does not include water theft. I have been informed that in the dry season, residents of the Tawau District have no other choice but to take part in water rationing activities, which sometimes last between five and seven days, due to the river water level dropping to 0.8 litres. Three short-term solutions have been proposed for the government to consider, namely to build a 5 million litre tank with the Ranggu and Quoin Hill pumps respectively, and a 2 million litre tank with a shared pump 10. However, these are only short-term solutions. For the long term for Bandar Tawau, a dam for water storage purposes is very much needed so that it can not only store additional rainwater during the monsoon season, but the water stored can also be used during the dry season. I ask the Federal Government to expedite the development process for the construction of the Cinta Mata Dam in Tawau. Mr Chairman, regarding the Papar Dam, although it is located in my friend's area in Papar, it also affects water consumers in Kota Kinabalu. I would like to raise the concern of the people regarding its construction. One professor, Professor Dr. Felix Tongkul, a geologist from the Faculty of Science and Natural Resources, Universiti Malaysia Sabah, has proposed that a Direct Water Intake Reservoir is a cheaper and more practical solution.

Tuan Chan Foong HinDAP · PHKota KinabaluEN

It requires direct intake of water from the river and storing it in a reservoir on higher ground. He said the cost of building the reservoir is only a small fraction of the RM3 billion price to build a new dam in Papar. At the same time, it will not destroy the geological diversity around it. The proposed dam project at Kaiduan, Papar, 36 kilometres from Kota Kinabalu, was initially postponed in 2015 after receiving strong objections from a special group of Orang Asli and Sabah's environment, but this project has been revived under the new Sabah State Government.

Tuan Chan Foong HinDAP · PHKota KinabaluEN

Now, to ensure sufficient water supply for the growing population in the West Coast of Sabah, including Kota Kinabalu, over the next 30 years. This project was initially identified as the Kaiduan Dam, but was renamed the Papar Dam Hydro Electric Project by the new Sabah Government, which will cost RM3 billion to build the dam. The proposed location is at Kampung Mondoringin in a remote area of Ulu Papar, the largest water catchment area in this state, spanning the Penampang and Papar districts. Nevertheless, I have been informed that the rainfall in the Ulu Papar area is among the highest in Sabah, with more than 3,000 millimetres per year. Besides that, Professor Tongur also claims that the dam may cause micro earthquakes caused by additional water pressure, which will not only harm plants but also the population nearby. So, the need for a dam in that area becomes a question. According to a report from The Edge Markets, two companies, Vizione Holdings Bhd. (VHB), and Pembinaan Maju Cemerlang Sdn. Berhad (PMCSB) have been shortlisted by the Sabah Water Department to design and build the Papar Dam, which is estimated to be worth around RM2 billion. According to the same report, both companies have received letters of intent jointly from the Sabah Water Department. The Minister of Infrastructure Development, Datuk Peter Anthony, recently said that the state government could borrow from Putrajaya to build this dam or consider public-private partnership efforts to raise funds. The Papar Dam is expected to be able to supply water needs to Kota Kinabalu and the West Coast of Sabah for the next 30 years, or sometimes for the next 50 years. So, my question to the Honourable Minister is, what is the Federal Government's position on the construction of this Papar Dam? Support or not? Next, will the Federal Government provide a direct grant or a loan after considering the Sabah Government's application for the construction of this Papar Dam? Mr Chairman, still under Item 16700, Local Flood Plan (RTB) and Urban Drainage. I found that the allocation has been increased from RM387 million this year...

Datuk Dr. Jeffrey KitinganSTAR · GRSKeningauEN

Honourable Kota Kinabalu?

Tuan Chan Foong HinDAP · PHKota Kinabalu

Ya.

Mr ChairmanEN

Honourable Keningau.

Datuk Dr. Jeffrey KitinganSTAR · GRSKeningauEN

Does the Honourable Kota Kinabalu oppose or support this Kaiduan Dam?

Tuan Chan Foong HinDAP · PHKota KinabaluEN

I have not stated whether I support or oppose it. What is important is, what is the Federal Government's position on the construction? I will continue, on the Local Flood Plan. I ask the Federal Government to provide a lot of land to solve the problem of frequent floods in the Kota Kinabalu, Penampang and Sepanggar areas, which is said to require RM3 billion, according to the Honourable Minister of Agriculture and Food Industries in Sabah, Datuk Junz Wong.

Tuan Chan Foong HinDAP · PHKota KinabaluEN

In addition, I also ask that the flash floods that frequently occur in Tawau also receive attention from the ministry, so that land is also provided to solve the flood problem in Tawau. Mr Chairman, finally I would like to refer to Item 020100, Department of the Director-General of Federal Land and Mines (JKPTG). On this matter, I would like to ask the Honourable Minister about the status of the application for funds by the Labuan Port Authority. The investment of these funds is for a 99-year lease of federal land under Lot 7079, Taulis 207536052, Bandar Labuan, for the purpose of the operations of the Labuan Port Authority at Dermaga Merdeka or Liberty Wharf. For the Honourable Minister's information, the Labuan Port Authority is fully responsible for any operation of private ports and jetties following its establishment on 31 January 2017 through the Bintulu Port Authority Function Expansion Order 2017. The application was made through a letter dated 6 September 2018. However, until now the land title has not yet been issued. At present, the Labuan Port Authority is still leasing Lot 7079 from the Federal Land Commissioner, and the lease of the land will expire next year on 31 October 2020. Now, the Labuan Port Authority is in the process of an RFP to appoint an operator for Dermaga Merdeka or Liberty Wharf. I hope that the land title can be issued in the name of the Labuan Port Authority as soon as possible. That is all, thank you.

Mr ChairmanEN

Thank you, Honourable Kota Kinabalu. After this, Honourable Keningau, followed by Honourable Rasah, then Honourable Setiu, Honourable Jelutong and Honourable Kuala Kangsar.

Datuk Dr. Jeffrey KitinganSTAR · GRSKeningauEN

Thank you, Mr Chairman. I would like to bring this House to several items, namely first, Item 040400, Sewerage Services with an allocation of RM23.8 million. I would like to ask whether this amount covers the construction of a sewerage system in the village at Batak, Tambunan, in my area. This is because the area identified and proposed for this, which is within the village, is paddy fields. It is on the banks of a large river and is not suitable. For me, if this is chosen as the sewerage location, firstly, villagers will lose their paddy fields. This is an area close to the village settlement, namely the villages. Secondly, if there is a flood, Sungai Pagalan is often inundated. This sewerage system may be damaged and pollution will occur from Tambunan all the way to the sea through several districts, namely the Keningau District, Tenom District, Beaufort District, Sipitang District. For me this is not suitable. I ask that this sewerage project be postponed until we obtain a more suitable location. Secondly, Item 02703, Mapping under the Department of Survey and Mapping Malaysia, where the allocation is RM62 million. I would like to ask whether this budget includes expenditure for surveying and mapping of native customary lands, or Native Customary Land Rights, in Sabah. If not, I humbly ask that an allocation be provided for the mapping of native customary lands in Sabah. Mr Chairman, thirdly, I would like to refer to Item 28000 on the Sabah water supply scheme. The budget allocated is RM48,050,000. However, only RM50,000 is allocated directly and the rest is for loans. I think this is not appropriate, not ngam, we say not ngam, why is it lent? Why is it not given directly? Because, if we lend this allocation, when the money lent is collected from Sabah and lent back to Sabah, Sabah will pay its own money back. So that is why I say not ngam, not appropriate. Therefore, those who owe Sabah are the Central Government.

Datuk Dr. Jeffrey KitinganSTAR · GRSKeningauEN

Not less than RM500 billion so far. I ask that, if it is considered, all of this RM48 million allocation be given directly. That is all. That's it. Thank you.

Mr ChairmanEN

Thank you, Honourable Keningau. Now I invite the Honourable Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Chairman, for the opportunity given to me this afternoon. There are a few matters I wish to raise concerning the Ministry of Water, Land and Natural Resources (KATS). Firstly, I congratulate this ministry for receiving an allocation, especially an allocation for development. I see that it has increased from RM2.8 billion to RM3.5 billion in 2020. That is an increase of more than 20 per cent. I hope that with this high increase in the development allocation, it can help bring benefits to all Malaysians. So, I will touch on some details under the development allocation only. Firstly, under the heading JPS or the Drainage and Irrigation Department (JPS). I see that a very large allocation of almost RM1 billion has been given, with certain breakdowns under Item 16700 under the Flood Mitigation Plan (RTB) and Urban Drainage. Last year it was RM445 million and next year it is RM443 million. Almost the same. I would like to ask, how is the allocation to the Flood Mitigation Plan distributed? This is because in my own area the Sungai Linggi runs through, and this year too there have been several overflows from the Sungai Linggi during heavy rain, causing floods. I understand that under RMKe-12, RM100 million was allocated for the fifth phase of the Flood Mitigation Plan for the Sungai Linggi. However, for next year, which is the fifth year or the last year under RMKe-11, is there any allocation from this RM443 million given to the Flood Mitigation Plan on the Sungai Linggi, especially one involving the Parlimen Rasah? This is because this area has many villages and also housing areas on the banks of the Sungai Linggi. So I seek an answer from the Honourable Minister. The second detail I wish to raise is regarding the Negeri Sembilan Water Supply Plan under Item 21000. As a son of Negeri Sembilan, I thank the government because in 2019 it was only RM200,000, but I see that this time a total of RM20 million has been allocated to the Negeri Sembilan Water Supply Plan. Thank you, because Negeri Sembilan is a small state. Syarikat Air Negeri Sembilan is also in a financial situation that needs an injection of funds from the Federal Government. I am very confident and believe that this allocation is very useful and very meaningful for improving the development and distribution of clean water in Negeri Sembilan. However, I would like to ask how this RM20 million will be disbursed? Whether it will be channelled directly to the water company or through the state government, because the water company is under the state government. Is this RM20 million specifically earmarked for certain programmes or uses only, or is the RM20 million a grant or fund to the water company? It is up to Syarikat Air Negeri Sembilan to use it according to the plan laid down by the board of directors of the water company. I seek an explanation from the Honourable Minister. Also regarding water, under Item 30000 under the heading Inter-State Water Conveyance. I see that a total of RM50 million has been allocated for this year. This is more or less the same as the previous year. I would like to ask, because by its heading it involves more than one state.

Tuan Cha Kee ChinDAP · PHRasahEN

Because this year an agreement or memorandum of understanding was signed between the Negeri Sembilan State Government and the Melaka State Government, under which the Negeri Sembilan State Government will, under certain conditions, supply water to the state of Melaka. I would like to ask, is some part of this RM50 million used for facilities such as pipeline preparation and so on involving Negeri Sembilan and Melaka? Next, regarding water also under Item 95000, namely National NRW. This is one of the matters that I think is very important. It is not only something that needs attention, but it is also a practice for us to avoid or reduce the wastage of treated clean water that can be used. I see that the target for next year is the same as the previous year, namely 31 per cent compared with what was achieved in 2018, which was 35.7 per cent. I would like to ask, I see there is an increase and a very high increase in the allocation. In 2018 only RM6 million was used, in 2019 RM131 million was allocated, and for this budget RM365 million has been allocated. A sudden increase, which is growing, and certainly if the allocation increases so much, the expectations and targets should also increase. So I would like to ask, is there a specific plan, a comprehensive plan for the whole country regarding the government's efforts to reduce the NRW percentage? Out of this RM365 million, what is its distribution, if any, to Negeri Sembilan, because Negeri Sembilan is also among the states with a high NRW of 32 per cent, especially in rural areas. So I would like to ask, is there any allocation for Negeri Sembilan? I would also like to ask, under this RM365 million allocated, what are the key factors, or main factors, such as pipe replacement and so on? Because many of these contribute to NRW. It is not only leaking pipes but also old meters that fail to function properly, or cases of illegal pipe connections, which people call water theft, and so on, causing losses. So I would like to ask, what is the ministry's plan? The last matter I wish to raise this afternoon is under Item 80000 under the heading National Sewerage Project. I see that this year an allocation of RM1.24 billion has been given. I believe it is related to development to upgrade sewerage systems. However, I would like to ask, why such a high allocation has been given for two consecutive years compared with the actual cost used in 2018, which was only RM432 million? Given that IWK itself is a consortium with the status to collect payments from consumers, why is such a large allocation, more than RM1.2 billion, given? Is there a justification or a special plan to solve the many outstanding problems? Because I see that there is still a lot of effort needed to upgrade the sewerage systems. Is this allocation used for that purpose? That is all from me. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, the Honourable Member for Rasah. Now I invite the Honourable Member for Setiu.

Peace be upon you and the mercy and blessings of God. Mr Chairman, I would like to touch on Item 030000 – Forest Management and Biodiversity. Where the allocation for 2019 is RM162 million and the allocation for 2020 is RM182 million. Regarding Item 030000 – Forest Management and Biodiversity, I would like to ask about the increase in allocation for 2020. Is it to add to the number of international programmes that have been implemented, such as biodiversity restoration and permanent forest, and to what extent are the effectiveness of these programmes in raising public awareness at an early stage to protect this biodiversity?

Apart from that, what drastic measures has the government prepared in tackling the issue of illegal logging? What are the government's initiatives in rehabilitating forest areas that have been destroyed due to this illegal logging? Secondly, Item 030200 – Wildlife Protection and National Parks. The allocation for 2019 is RM77.4 million and the allocation for 2020 is RM88.9 million.

This item, namely Wildlife Protection and National Parks, the 2020 allocation has increased by approximately RM11.5 million. According to the World Economic Forum, Malaysia has a world-class road network. This matter is very commendable. However, from the perspective of wildlife conservation, they experience habitat fragmentation, where they are trapped in small habitats and surrounded by infrastructure such as roads. This leads to cases of deaths of wild animals such as the Malayan tiger, bears, the Sumatran serow and so on, caused by road accidents. What are the government's short-term and long-term plans in tackling this issue? And what steps has the government taken to foster a conservation spirit among the public towards wildlife? Likewise, regarding the issue of wildlife being shot dead, such as the case of the Borneo pygmy elephant that was shot dead recently, and to what extent the government's efforts are in protecting wildlife from threats such as illegal poaching as well as viral infections, such as the case of the Malayan tiger species, Awang Besul, recently. Please explain. Thirdly, Item 050500 - e-Tanah System for the Federal Territory of Kuala Lumpur where...

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Honourable Member for Setiu, excuse me, may I pass?

Mr Chairman

Ya, silakan.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Another issue that has occurred is the threat to livestock posed by these monkeys. It has become a serious threat today, and we find that most farmers complain about the problem of monkeys released in village areas becoming a threat. Perhaps the Honourable Member for Setiu can see this as one of the matters that needs attention from the government. Thank you.

Can you include it in my speech. I request that the speech of the Honourable Member for Kubang Kerian be included in my speech, where not only monkeys need to be looked after, but also lutong as well. Mr Chairman...

Dato’ Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Honourable Member, not just monkeys, lutong, but they too must...

They, they [Laughter]

Dato’ Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Pigs, pigs – babi.

Pigs. Oh! This is a new language, Terengganu people do not understand [Laughter]. Mr Chairman, the implementation of the e-Tanah system at 100 per cent, so far it has only been implemented in the Federal Territory of Kuala Lumpur. Is it that with the removal of the allocation under this item, where the allocation for 2019 was RM12.9 million but for the 2020 allocation there is no allocation at all? Has the removal of the allocation under this item been transferred to other items? If so, under which items? If not, it is impossible for a newly implemented system not to require any allocation. Please explain. Next, Item 030200, Pre-Feasibility Study. In 2019 there was no allocation, but in 2020 the allocation is RM5 million. Next, under this item, RM5 million is allocated. However, in the previous year there was no allocation at all. I would like to request details from the government regarding this item.

Finally, Item 10300 - Development of Technology for the Use of Training Timber for Forest Fire Prevention. Up to now, how far has the development of this technology progressed in preventing forest fires? Please explain, Honourable Minister. Thank you, Mr Chairman... [Reciting a short prayer] Wassalamualaikum warahmatullahi wabarakatuh.

Mr ChairmanEN

And upon you peace. Thank you, the Honourable Member for Setiu. Now I invite the Honourable Member for Jelutong.

Thank you, Mr Chairman. I rise to debate, and before I refer to the items, I would like to record my highest appreciation to the Honourable Minister and also the JPS staff, especially in Penang, who have made a visit to the Jelutong area, particularly in the Datuk Keramat area, in the Sungai Pinang area, which often experiences flood problems. I refer to Item 139000 - Flood Control and Warning System Plan and I would like to ask whether the ministry intends to further enhance flood warning signals, the installation of any mechanism in the area, where we see areas such as Jalan P. Ramlee, Kampung Makam, Jalan Counter Hall, Jalan Maklum and Kampung Rawa in the Sungai Pinang State Assembly seat constantly experience flood problems. I would like to urge the Honourable Minister to give attention, in addition to the flood mitigation projects that have already been planned, whether as an immediate step, flood warning signals can be installed in these areas. At the same time, I would also like to refer to Item 16100 - Flood Mitigation Plan and Urban Drainage and ask the Honourable Minister whether there are plans to build or carry out sea embankment projects. I ask this because I have read an article in Matchable South-East Asia, published by The Center for Governance and Political Studies, which confirms that- we see, generally, we know that the North Pole and South Pole, due to the rise, with respect, of world temperatures, are beginning to melt and this is causing sea levels to rise further. This article states that nine locations in Malaysia may sink within 30 years. The locations stated in this article are Alor Setar becoming an island. This is stated in this article. Along the area from Parit Buntar to Taiping will no longer be visible due to rising sea levels. The North-South Highway will sink, Bagan Datuk, Teluk Intan, Kuala Selangor will disappear, Port Klang will sink, Shah Alam will shrink and KLIA will be located on the coast. This is a matter that somewhat worries me. Penang is not isolated. Penang often experiences flood problems. So I would like to ask the ministry, whether there is any major plan to implement flood mitigation measures. In addition to flood mitigation projects, enlarging rivers, dredging rivers and so on, is there any plan to build sea embankment projects? This is because there are also suggestions or views stating that these sea embankment projects can to some extent control the inflow of water when sea water levels rise. At the same time, when there is heavy rain, these embankment projects can control the occurrence of floods. I will hand over a copy of this article published by the Center for Governance and Political Studies. At the same time, I also urge the ministry to refer to Item 260000 - Penang State Water Supply Plan. In Penang, I thank you because so far we have not practised any water rationing.

However, I would like to draw the attention of the Honourable Minister to the three dams in Penang, namely Empangan Air Hitam, Empangan Bukit Mertajam and Empangan Bukit Damba, which are located in the Parlimen Jelutong area, and ask whether there are any plans to further improve the facilities there so that we do not overly request and, with respect, overly take water from Kedah or from the state of Perak. However, I would like to ask the Honourable Minister whether there are any plans to further improve the facilities here?

Finally, I would like to thank the Honourable Minister for the announcement made recently that the planned flood mitigation works at Sungai Pinang will begin next year. Hopefully, with the implementation of these flood mitigation projects, the flood incidents in Kedah, in Penang, in Jelutong will become history, and the people in the Jelutong area will no longer have to endure the floods that have occurred since about 11 to 15 years ago. I request to support, and I thank you for the opportunity given.

Mr ChairmanEN

Thank you, the Honourable Member for Jelutong. Now I invite the Honourable Member for Kuala Kangsar.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

The Honourable Member for Kuala Kangsar is not in the House.

Mr ChairmanEN

Oh, not there? Alright, in that case, I invite the Honourable Member for Bagan Serai.

Thank you, Mr Chairman.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Mr Chairman, please swap.

Mr ChairmanEN

Alright, alright. We will give the opportunity to this side now, yes.

That side first, yes?

Mr ChairmanEN

I have already put my name down. That's the problem.

I've already started. Already started.

Mr ChairmanEN

According to the list, next on this side...

No one there, is it?

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Parit Sulong can too. Parit Sulong is on that list.

Mr Chairman

Ya, ya.

Tuan P. PrabakaranPKR · PHBatuEN

Mr Chairman, Batu is there too.

Just let Bagan Serai go ahead.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Ah, the Honourable Member for Kuala Kangsar has arrived.

Mr ChairmanEN

Yes, the Honourable Member for Kuala Kangsar. Please go ahead.

Mr Chairman, on this side as well, Mr Chairman. GPS, there has been none until now.

Mr ChairmanEN

GPS, I have only just received the list. I have already included it. It is already there.

Don't forget Papar.

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Excuse me, Mr Chairman. I thought it would be a long time. I am coming from outside. I have gone straight to Item 15000 – Minor Works by the Department of Irrigation and Drainage (JPS), Various States. I ask the Honourable Minister to state why the ministry has reduced this allocation so significantly, by almost RM22 million compared with last year? When many areas, especially in the Kuala Kangsar Parliamentary constituency, need the attention of JPS, especially in drainage and sewerage works in village areas. How can an allocation of RM100 thousand really be sufficient to meet all the needs in the areas that truly face the problem of unmanaged drainage, particularly those that often suffer flash floods in my area? For the Kuala Kangsar Parliamentary constituency, there are several problems that Kuala Kangsar asks the Honourable Minister to focus on and give attention to in the provision of allocations. First, maintenance and deepening of problematic rivers, as well as maintenance and upgrading of a systematic drainage system to overcome flash floods. Second, the development of a hot spring pool at Kampung Ara Panjang in the state constituency of Manong. Next, the flash floods that constantly occur at Kampung Rambai Tujuh in the state constituency of Bukit Chandan, and the flash floods at Kampung Jeliang in the state constituency of Manong, and finally the flash floods in housing estates that are currently being maintained by the local authorities (PBT). Next, I will go straight to Item 15400 – Environmentally Friendly River and Drainage Management Plan. There is an increase of more than RM168 million for this allocation. I ask the Honourable Minister to state what the priorities for drainage management will be, and where? Honourable Minister, the Perak River alignment that flows through and divides the Kuala Kangsar Parliamentary constituency, which once attracted water sports enthusiasts as well as the flora and fauna of aquatic life, is now no longer very attractive for tourists to come and hold water sports there, because the riverbed of the Perak River in the Royal Town of Kuala Kangsar has become shallow and silted up, and accumulates sediment, which is no longer conducive to these activities. I ask the Honourable Minister to state whether the Honourable Minister intends to reconsider my proposal to restore the Perak River in this area so that it becomes a water sports centre again, a famous river, and a transport route that can be developed for river cruises, with permission, all the way to Bagan Datok? What efforts will be made to ensure that cleanliness or pollution does not recur, and that the decline in the water quality index status of all rivers in this country does not recur, especially at stations upstream and downstream of illegal rubbish dump sites? I now move to Item 16900 – Research and Development. Honourable Minister, please elaborate, what research is being undertaken to ensure that our water resources are guaranteed and of good quality? Currently, Malaysia uses only about three per cent of groundwater resources, and the target for total groundwater use is set at 20 per cent, once there is specific legislation for the use of groundwater resources. Is there any research effort to ensure that we can use more than 20 per cent of groundwater resources, given the urgent needs across the country at certain times? Also, is research being done to identify how long these resources can last? Apart from groundwater resources, does the Honourable Minister intend to take initiatives in seawater desalination, which is among the alternative methods identified that can ensure sufficient water resources, especially in states that often experience water supply shortages? For example, Singapore has experienced a shortage of water supply and has adopted seawater desalination as an alternative source of raw water, where 25 per cent of Singapore's water needs are now met. I now move to Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. In the Kuala Kangsar Parliamentary constituency, we need infrastructure that will solve the flood problem that has not been resolved for a long time.

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

With an allocation of RM443 million for the year 2020, how will the ministry utilise that allocation for the purpose of regulating every flood mitigation project across the country that will be implemented? Does this reduction in allocation mean that flood mitigation projects in areas that often experience floods will be disrupted or affected? Out of that allocation, how much will be earmarked for preliminary research before the commencement of each mitigation project? I now move straight to Item 15100 – Coastal Erosion Prevention. Honourable Minister, the topography of the Peninsula is exposed to the open sea and the monsoon winds that bring large waves and environmentally unfriendly development. I ask the Honourable Minister to state what form of erosion prevention is the most effective and will be implemented, and how long the durability of erosion prevention is for each beach? Also, what is the estimated allocation for the installation of erosion barriers near fishing villages? Perhaps the time has come for a coastal zone management policy to be established. I also ask the Honourable Minister for a brief explanation: is the study conducted by Rutgers University USA recently, which states that Malaysia's major cities will be below sea level by 2050 under their study entitled New Elevation Data Triple Estimates of Global Vulnerability to Sea-Level Rise and Coastal Flooding, accurate? What steps will the government take to save against this possibility? I now move to Item 08601 – Planting of Mangrove Trees and Suitable Species on Coastlines (JPSM). Here, the allocation for 2019 and 2020 is estimated, with the allocation stated for planting 6.6 million trees. I ask the Honourable Minister to explain, from where was the surplus allocation obtained for planting those 6.6 million trees? With an allocation of RM2 million, how many more mangrove trees will be planted in 2020? Also, what is the actual cost of planting mangrove trees according to the area of coastline? That is all, Mr Chairman. Thank you.

Mr ChairmanEN

Thank you, the Honourable Member for Kuala Kangsar. How many more speakers from PH are there? The Honourable Member for Bagan Serai, I have already included. The Honourable Member for Padang Serai is already there.

Puan June Leow Hsiad HuiPKR · PHHulu Selangor

Hulu Selangor.

Mr ChairmanEN

The Honourable Member for Hulu Selangor.

Tuan P. PrabakaranPKR · PHBatu

Batu.

Merbok.

Ledang.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Now the BN side.

Mr ChairmanEN

The BN already has a list.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Yes, the BN already has a list.

Mr ChairmanEN

The Honourable Member for Merbok, the Honourable Member for Batu, yes, anyone else?

Ledang as well, Mr Chairman.

Mr ChairmanEN

Already there, already there. Oh yes, the Honourable Member for Ledang. Okay. Alright, I will read out the list that is available now. The Honourable Member for Bagan Serai will continue at 2.30 later. The Honourable Member for Paya Besar, the Honourable Member for Sibuti, the Honourable Member for Parit Sulong, the Honourable Member for Papar, the Honourable Member for Kemaman, the Honourable Member for Hulu Selangor, the Honourable Member for Tanjong Manis, the Honourable Member for Merbok, the Honourable Member for Jerantut, the Honourable Member for Batu, the Honourable Member for Bachok, the Honourable Member for Ledang, and so on, follow the BN list, yes.

Tuan Karupaiya A/L MutusamiPKR · PHPadang SeraiEN

Mr Chairman, Padang Serai?

Mr ChairmanEN

The Honourable Member for Bagan Serai is here, yes, yes. The Honourable Member for Bagan Serai is here... [Interjection] Both are here. The Honourable Member for Padang Serai and the Honourable Member for Bagan Serai are both here [Laughter].

Limbang. Limbang has also just submitted, Mr Chairman. Limbang has just been added.

Mr ChairmanEN

The Honourable Member for Limbang has just come in, yes? Okay. The Honourable Member for Petaling Jaya.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

It's only the name that is serai (lemongrass); there is no lemongrass at all.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Is this fragrant lemongrass or what kind of lemongrass?

Tuan Noor Amin bin AhmadPKR · PHKangarEN

The Honourable Member for Beaufort also wanted to come in, but he is not in the House.

Mr ChairmanEN

Later, yes. The Honourable Member for Limbang, the Honourable Member for Sandakan.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

I have heard twice now that you keep supporting the Honourable Member for Beaufort. Is there something going on? [Laughter]

Dato’ Haji Salim SharifUMNO · BNJempolEN

Time is up.

Mr ChairmanEN

The Honourable Member for Kinabatangan wants to speak? Not on the list? Okay, we will fill it in later, yes. The Majlis resumes sitting as the Majlis Mesyuarat. [The Majlis Mesyuarat resumed sitting] [Mr Speaker presided over the Mesyuarat]

Dato’ Haji Salim SharifUMNO · BNJempolEN

Has the Honourable Member for Jelutong already spoken, the Honourable Member for Jelutong? Today is quite a good day, isn't it? Good, good.

Mr SpeakerEN

Alright, the Majlis will break for lunch and continue at 2.30 p.m. Thank you.

[The sitting was suspended at 1.01 p.m.]

[The sitting resumed at 2.30 p.m.]

Mr SpeakerEN

[Deputy Speaker (Dato' Mohd Rashid Hasnon) presided over the sitting] [The House sat in Committee] [Deputy Speaker (Dato' Mohd Rashid Hasnon) presided over the

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Members, I now invite the Honourable Member for Bagan Serai to continue the debate.

Thank you, Mr Chairman. Bismilahir Rahmanir Rahim. Head B.23, Item 030000 – Forest and Biodiversity Management, Item 030200 – Wildlife Protection and National Parks. I would like to ask the ministry: to what extent is the government prepared to strengthen the National Biodiversity Centre (NBC) towards making it the Natural History Museum (NHM)?

Who are the individuals in this NHM team, and what are their criteria, so that it truly becomes a success for our government? This is the first point. Will the government further strengthen education and awareness programmes more aggressively? Thus, by recognising individuals who are active or NGOs, for example the Malaysian Nature Society (MNS), which is active in this aspect. Fourthly, are we prepared to increase the monitoring of wildlife protection to avoid conflict between humans and wildlife, and also these illegal hunters? Will the government increase research and development, and especially funds for competent researchers? I would like to ask the ministry to what extent the state governments have heeded the call of the Federal Government? In the conservation of wildlife habitats such as the Central Forest Spine, with an appropriate area so that wildlife have sufficient space to roam. We have not heard of animals being killed by vehicles or animals attacking people. This is what we are worried about. Another matter is the critical tiger population in Malaysia, said to be fewer than 200. I would like to know exactly how many there are; has a study been conducted? How many are in Belum-Temengor? How many are in Taman Negara, Terengganu, Johor and so on? Mr Chairman, Item 14500, namely upgrading urban infrastructure and drainage and flood mitigation. I want to talk about the flooding that has occurred in Bagan Serai. This flooding in Bagan Serai has become an annual event. When the rainy season persists, and when the sea tide is high, the water collides, and so a flood occurs that just sits there. It stays in the middle and does not leave. So this has become a matter that is a cry of the people in the Bagan Serai Parliamentary constituency. If we look at the RTB, the RTB has been completed. The RTB that was given earlier has been completed. Why? Firstly, the drained water cannot get out of the paddy fields. We heard recently that the paddy fields are submerged, the rice fields are submerged. The water cannot get out because the river water level is high due to high tide and also due to continuous rain. Rain upstream. So these are matters that touch on people. Of course the action taken by JPS is to mobilise these mobile pumps. Good. But the pumps that move in Bagan Serai, I see, seem insufficient. I have previously proposed that if there are not enough, we borrow from Larut Matang because many areas are affected. Secondly, reduce the discharge of water from Tasik Bukit Merah. If the water is high, there is a risk to the lake, to that dam lake. That is why the engineers are very careful in releasing water, but at the same time they are worried about the flooding that is happening today. The long-term project, this is in fact the real demand. In the RMK-11, Rolling Plan Keempat – 2019/2021, it has been stated that the RTB of Sungai Kurau, Sungai Sama Gagah and Sungai Beriah should be upgraded. Upgrade the banks, for example from Tasik Bukit Merah to Padang Lalang. Upgrade the banks at Sungai Beriah and Sungai Sama Gagah. Upgrade the control gate structures, bank protection, and also carry out rehabilitation dredging of existing drainage. Likewise, the demand is to establish high-capacity pumps. Permanent pumps. If it is always like this, I stated the other day that if it is an annual event, for example at the Temporary Relocation Centre (PPS) at Sekolah Kebangsaan Changkat Lobak, there is not enough infrastructure. There is no open hall, and not enough toilets. I propose that a Permanent Relocation Centre (PPK) be built. Use the teachers' quarters that are not used, so that those affected, who recently were flooded for up to 15 days. More than two weeks residing there. So these are things that need to be looked at. One aspect is for flood victims, one aspect is the RTB. The upgrading that we are asking for, hopefully Bagan Serai will get it. Mr Chairman, Item 15200 – Improving, Beautifying, Cleaning and Treating River Water. I want to bring up this story: recently, during the Merdeka season, we in the Kerian District organised a programme that was held for the first time in history, namely a river trip along the Sungai Kurau. I have never had this opportunity. 21 boats, 80 participants travelled for about two hours and more. From the Kuala Kurau Marine Jetty to Kampung Padang Lalang, looking – oh, it turns out this river is beautiful. I did not see any rubbish or dirt.

Only, I noticed that it would be good if these rivers were looked at and made into an eco-tourism centre like those in other countries. In Vietnam, where we went to see, the Mekong River has all kinds of tourist centres.

So fishermen going out to sea is dangerous, but if they bring these tourists it is not dangerous, and this becomes a source of income and employment for them. This is a source of livelihood for them. This can attract many more tourists to the Kerian District area or especially the Bagan Serai Parliamentary constituency. So, the river I want to talk about, Sungai Kurau, is actually a historic river. In the time of the British colonialists, it was a trading centre; ships came in, I am told. I read in history that the ships, as the story goes, brought sugarcane and coconuts to be exported. These products were exported to foreign countries in the past, this is the story of the past. So this historical storytelling can also become something good for tourism in Bagan Serai. Another thing, we must remember migratory birds. This is a natural airport, migratory birds from north to south. Local birds can be seen while we travel along this Sungai Kurau. Besides that, we can also see crocodiles, but the crocodiles in Sungai Kurau are good crocodiles. Good crocodiles, not like some of the others, what is it?

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

Sebelah sana.

The other side? On that side, what kind of crocodile?

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

Land crocodile .....

Land crocodile? I don't know, later the Honourable Member for Jelutong can explain. I say good crocodiles because wherever there are crocodiles, there are giant freshwater prawns. So this is the best. I would also like to say that alongside this, we can tell the public or tourists about the Banjar community in Bagan Serai, which is famous and renowned for its history, its culture, its food and so on. Perhaps we can also build a floating market like other places. I am not proposing anything other than Pulau Orang Utan in the Bagan Serai Parliamentary constituency, and apart from Kuala Gula, a bird sanctuary. It would be good if these existing rivers were made into rivers, because this river, the first time I travelled it, was truly beautiful and lovely. If possible, the Minister or Deputy Minister, please come to the Bagai Serai Parliamentary constituency and see for yourselves what the Sungai Kurau is like. The distance I travelled that day was 58 kilometres. So I thank Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Bagan Serai. Now I invite the Honourable Member for Pengkalan Chepa, seven minutes, because there are more than 23 others still.

Ustaz Haji Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Thank you, Mr Chairman. Bismillahi Rahmani Rahim. I will continue with Item 020400. Floods cannot be avoided, but the risk of disaster can be managed. First, I would like to ask about the National Flood Forecasting and Warning Programme (PRABN). A study by the Department of Irrigation and Drainage Malaysia (JPS) found that about 10 per cent of the country's land area is flood-prone, and can affect about 4.9 million residents, with property losses exceeding RM900 million a year. Existing data shows that PRABN is being implemented in phases and is still not fully completed. I would like to ask when PRABN is expected to function properly, and whether it can provide sufficient lead time for agencies and residents to act earlier to face flood disasters.

Ustaz Haji Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

In addition, if floods occur in the capital, is this system also able to provide warnings effectively and efficiently? What is the cost allocated to develop this system by phase? Second, we understand that the cost required to manage disasters is quite high, and this is a constraint faced by the government. However, the existing drainage system needs to be reviewed. It is possible that the drainage system developed about 20 years ago is not the same as our situation today. With the increase in population and high drainage pressure, I therefore also suggest that a sum of allocation be channelled to implement guidelines and development plans to make our cities resilient to flood disasters.

Next, Item 15200 – Improving, Beautifying, Cleansing and Treating River Water and Infrastructure (MASMA). Mr Chairman, I am interested in the initiative taken by the Dutch side to develop the Room For The River system after the country was hit by floods in 1993 and 1995. The Netherlands invested billions of euros in that system because a large part of its area is at a level exposed to flooding. I therefore want to ask whether the ministry has adapted this system, because it can not only reduce the risk of flood disasters but also conserve river sustainability.

Furthermore, statistics revealed by a lecturer at the School of Social, Environmental and Development Studies, Faculty of Social Sciences and Humanities, National University of Malaysia (UKM), show that more than 80 per cent of rivers in major cities can be considered dead due to increasing industrial waste pollution. The Department of Environment (JAS) placed Johor, the state with the most polluted rivers, in 2017. I therefore want an explanation of the allocation made under this item: how the allocation is distributed, and what the government's annual target is for restoring severely polluted river systems.

Next, Item 040100 – Water Management. Mr Chairman, the Honourable Minister's answer yesterday in the Dewan Rakyat was that Malaysia has the right to review the price of water supplied to Singapore, even though Singapore claims Malaysia lost that right after failing to negotiate in 1987 and 2012. I am of the view that all representatives agree that the selling price of raw water to Singapore, at three sen per thousand gallons, is very unreasonable. I propose that the ministry table a White Paper in the Dewan Rakyat on the 1962 Water Agreement issue and the efforts made by Malaysia to recover the water price. Since the agreement will expire in 2061, a lot of expenditure has to be spent for that purpose. Therefore, what is the ministry's road map to ensure both countries can sit down and discuss this issue in the near future...

May I ask for clarification.

Ustaz Haji Ahmad Marzuk bin ShaaryPAS · PNPengkalan Chepa

Ya sila.

Thank you, Mr Chairman. I am interested in what the Honourable Member said regarding the water supply issue. I ask for the Honourable Member's view: if we look at the items shown in this book, the government's estimated expenditure, where the Kelantan Water Supply Plan, for example, is allocated RM1 million with a loan of RM12.6 million. The issue now is that some states are given loans, and some are given in the form of grants, and I have previously learned that loans are charged interest at two per cent. So what is the Honourable Member's view, because other states, for example Penang, receive an allocation of RM33 million. So what is the Honourable Member's view? We request that an explanation be given on how consideration is given among states, and if we look from the perspective of the total loans given, it is not balanced, while the government's policy is to create a balanced environment between regions.

So states should ideally be given allocations not in the form of loans. So what is the Honourable Member's view on this issue?

Ustaz Haji Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

In my view, I very much agree that the said loan amount be converted into grants, and as a tribute from the Honourable Minister to the state of Kelantan, which has recognised the Honourable Member, I congratulate him on the DJMK award from the state of Kelantan. Next, Item 050300 - International Giant Panda Conservation Programme. The International Cooperation Agreement on Giant Panda Conservation was signed by the Government of Malaysia and the Republic of China in 2012. The panda pair arrived in Malaysia in 2014 and were placed at the National Zoo for a period of 10 years. From that time, the Government of Malaysia must provide an allocation of RM1 million every year to pay the fee to be contributed to the Giant Panda Conservation Fund. Besides being a symbol of friendship and prosperity, the Giant Panda is also said to be a national tourist attraction and indirectly increases the confidence of investors from China to continue investing in Malaysia. The issue is how far the Giant Panda is still a diplomatic and trade symbol between Malaysia and China five years after it was established, and how much cost has been borne by the government for this International Conservation Programme throughout its operation? Mr Chairman, that is all, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Pengkalan Chepa. Now I invite the Honourable Member for Padang Serai, followed by the Honourable Member for Paya Besar.

Tuan Karupaiya A/L MutusamiPKR · PHPadang SeraiEN

Thank you, Mr Chairman. Next, I go to Item 030300 – what is the Federal Government's plan to ensure that the garis perpaduan (unity guidelines) are complied with and meet international standards.

Tuan Karupaiya A/L MutusamiPKR · PHPadang SeraiEN

Second, what is the Federal Government's plan to ensure our forestry is not threatened by biological threats and "biologism"? What action will the Federal Government take if biological threats occur? The next item is 030100. What is the Federal Government's plan to ensure that the National Forestry Policy and the National Forestry Act, if made into regulatory guidelines, address logging and illegal hunting issues? Second, what intervention measures can the Federal Government take if illegal hunting becomes rampant? Third, what punitive measures will be taken against parties found guilty of logging or illegal hunting within the purview of the Ministry of Water, Land and Natural Resources? Next, Item 030000. So far, what are the achievements of the Forest Research Institute Malaysia (FRIM) in establishing strategic cooperation between local and international agencies? Second, regarding the suggestion to use FRIM to generate income from tourism, how does the ministry intend to commercialise FRIM, especially in advancing research? Next, Item 040100. Please explain what plans there are to stop and manage water pipes that have expired and become a problem in the Padang Serai area. Often pipes burst and there is no water pressure; the pipes, one could say, when repaired and the water is turned on, the other pipe bursts again. There are so many problems because the pipes have rotted, and there is no allocation from the state government this time. In this allocation, I hope the Honourable Minister will make a small allocation for Kedah, especially the Parlimen Padang Serai.

Tuan Karupaiya A/L MutusamiPKR · PHPadang SeraiEN

According to the 2050 Study, will there be a water problem in the Kulim district? Therefore, Padang Serai proposes building a dam to them at the Sungai Kob area. When we build one dam, two problems are solved: (i) the water reservoir can be secured; and (ii) floods can be prevented. I hope the ministry takes note, because the population in my area will increase month by month, and many residents from the Penang side are migrating to my area and buying houses there, so by 2050 I think a major problem will be faced by the Kulim district. Therefore, I thank you. That is all.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Please, the Honourable Member for Paya Besar, followed by the Honourable Member for Sibuti, and then the Honourable Member for Parit Sulung.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatulallahi wabarakatuh. Thank you, Mr Chairman. Before I begin the debate on the Ministry of Water, Land and Natural Resources, I would like to welcome the students and NGO members from Universiti Malaya Lembah Pantai Kuala Lumpur and from the state of Johor, Bidadari Selatan. Welcome to Parliament.

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Selamat datang.

May I interject?

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

You haven't even started yet, what do you want to interject about?

About the students of Universiti Malaya.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

It has no connection with the item.

Is it allowed just because they were welcomed?

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Baik.

Thank you. I want to ask the Honourable Member for Paya Besar, do you know whether these Universiti Malaya students are still going hungry, facing financial problems?

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Please, the Honourable Member for Paya Besar.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

What's the connection? Ask Lembah Pantai. Lembah Pantai is here.

I thought the Honourable Member for Kuala Krau and I would debate at the Committee stage of the Ministry of Education later. Mr Chairman, I want to touch on several items relating to Parlimen Paya Besar and involving national matters. Firstly, Item 13900 involving the Flood Control and Flood Warning Programme. I thank the Department of Irrigation and Drainage (JPS) Pahang State for establishing a signal system to inform the public about the danger of floods when expected in five or eight hours. But the problem, Honourable Minister, is why no technical notification has been given to the public, especially the urban community of Sungai Lembing and the community of Kampung Batu 6 Nadak Sungai Lembing. Why? Because JPS has set up this system, Honourable Minister, but has not informed the public. This awareness programme is very important so that they know the siren is to indicate danger.

I also want to touch, Mr Chairman, on Item 15000 – Minor Works of JPS Various States. Why? I see a very large reduction, Honourable Minister, namely from RM22 million to RM100 thousand. The Paya Besar area of the Honourable Minister is, as the Honourable Member for Bagan Serai mentioned earlier, an area with an annual event, namely floods. Every year floods occur. So why is JPS not allocated a sufficient amount of money to repair drains and drainage, especially in Parlimen Paya Besar? I also want to touch on Item 16700 – Urban Flood Mitigation and Drainage Plan. I want to know the latest status regarding the second package for the construction of flood prevention walls for Sungai Pandan and Sungai Kuantan at Bukit Rangin. I see the allocation already exists under the Eleventh Malaysia Plan, with just one year left to finish, Honourable Minister, but there are still no signs. Last year the Honourable Minister's answer was at the design stage; I want to know the latest status, which should be stated to me. I also want to touch on Item 22000 – Pahang State Water Supply Plan. I thank the Honourable Deputy Minister from Pahang, who is also here listening to this debate. Why was the Pahang State Government not given a financial allocation directly for this year? It was only given RM27 million in the form of a loan. The Honourable Minister of Economic Affairs came to Pahang to make an announcement, and the people of Pahang were happy and pleased because approximately RM2.41 billion was allocated in the Eleventh Malaysia Plan. Relating to water, 173 for a balancing tank with a capacity of RM106 million in the Gebeng industrial area, and in the area of the Honourable Deputy Minister, namely water supply disruption in Raub. So I want to see where the allocation is in the Pahang State Water Supply Plan. Is it kept in one item that I don't know about? I hope the Honourable Minister will please answer. Why? These four items are closely related to me and the people of Pahang, and I earnestly request an answer from the Honourable Minister. I also want to touch, Mr Chairman, on several matters at the national level. Item 030200 – Wildlife Protection and National Parks. Universiti Sains Malaysia, Mr Chairman, has conducted a study in 2017 stating that species such as monkeys, wild boars, elephants, pandan civets and macaques are among the species whose forest populations are decreasing by the day. I want to know what the ministry's efforts are to protect these wildlife species so that they do not record high deaths, because if this is what we do, we will lose forest populations. We must follow how Japan does it. The Pakatan Harapan government really likes Japan, so look at what Japan does. Japan carries out an Artificial Feeding Program and a Habitual Improvement Programme, with permission. So I really hope these matters can be coordinated so that we can save forest wildlife. I also want to touch on the item under Ministerial Meeting Tiger Range Countries. Why? I am sure this morning the Honourable Member for Rembau mentioned how many Members of Parliament had raised the International Union for Conservation of Nature (IUCN), and I am worried, Honourable Minister, that for example tigers are sold for RM620 thousand up to RM1 million, and these hunters dare to risk their lives, dare to be punished, but they are more attracted to the sales amount because the sales amount is considered profit, whereas they forget that the forest treasure should be saved. I also touch on the Honourable Minister. The final minutes concern the EU. I am sure that on the government side and the opposition side we are very sensitive when it comes to the palm oil industry.

I am sure the Honourable Minister understands very well, and all the Honourable Members in this august House understand very well. The EU rejects our palm oil industry or palm products because of logging and because of orang utans, but I do not see under Item 030000 – Forest and Biodiversity Management that this can curb the matter.

This is because what is happening today is that WWF has conducted a study on the shortage of orang utans in the eastern Sabah area, in the Kelambar and also Tabin areas. These are all matters that this ministry should take care of, and it should take a sufficient allocation, as the Honourable Member for Arau often mentions. If there is not a sufficient allocation, we support it being increased so that we can save the forest and correct the matter at the international level, and ultimately this EU issue will save the surplus oil stock in our country. Mr Chairman, there is one matter I want to touch on, namely NRW Nasional...

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Be quicker, time is up.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

I understand. Please allow me a little.

Mr Chairman (Dato' Mohd Rashid Hasnon)

Baik, silakan.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

One minute, thank you. I really hope, Honourable Minister. This is a matter that worries me, Honourable Minister. I am sure this is one of the ministries where, when debating, there are two figures, namely the Honourable Minister and the Honourable Deputy Minister. Congratulations, because I rarely see a ministry where there is a Minister but no Deputy Minister. But this is a ministry that I regard highly. That is why I really hope the service delivery system of this ministry must be corrected. I take the example of NRW Nasional, which has been allocated RM1.9 billion in the Eleventh Malaysia Plan. But what disappoints me, Honourable Minister, when I look at the Audit Report 2018, is that actual expenditure up to 31 December 2018, Mr Chairman, is only RM6.3 million, that is 0.33 per cent. The Honourable Minister came to Gebeng to make a press statement that at the end of the Eleventh Malaysia Plan we will reduce NRW to 31 per cent. But expenditure is only 0.33 per cent. There is still 99.67 per cent of the RM1.9 billion allocation of the Eleventh Malaysia Plan unused. I want to know, Honourable Minister, if we need to restructure agencies, then we restructure agencies. This is because I really hope that under the leadership of the Honourable Minister we can solve the NRW problem. If possible, please look at Parlimen Paya Besar regarding this NRW, which is very large. I agree, Mr Chairman, that the water agreement with Singapore must be made, but allow me to give a small suggestion, Honourable Minister. We have been friends with Singapore for a long time; we are its second-largest trading partner after China. We also had a trade surplus of approximately RM32 billion in 2018 when comparing imports and exports. Let us discuss nicely and not use force, because we have international law. Thank you, Mr Chairman, thank you, Honourable Minister.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Paya Besar. Now I invite the Honourable Member for Sibuti.

Thank you, Mr Chairman. I will go straight to P.23, Item 10100 – Wildlife Conservation and International Forestry Cooperation Projects, Sarawak. The Parlimen Sibuti under the Eleventh Malaysia Plan was approved for the construction or establishment of the Sibuti Wildlife Sanctuary with a value of RM2 million. Here I see the allocation provided — I see that the RM2 million allocation cannot be seen in the establishment of the Sibuti Wildlife Sanctuary. I also wish to seek an explanation on this matter since the Sibuti Wildlife Sanctuary is very important. Many wildlife captures in northern Sarawak have to be brought about 1,000 kilometres to Kuching when we want to rescue the wildlife. Therefore we need this Wildlife Sanctuary, with permission, in northern Sarawak. Next, I go to Item 15000 – Minor Works, Department of Irrigation and Drainage (JPS), Various States.

I see the allocation last year was RM22 million and this year only RM100 thousand. I would like to obtain an answer as to why there is such a sharp decrease in the allocation, and my understanding is that these minor works are usually river-cleaning projects. If we look at areas in the state of Sarawak, especially, many river-cleaning projects are needed by residents, especially in the villages and also in the longhouse areas. This is to ensure that their rivers are clean and also not clogged, since at this time much oil palm planting is causing longhouse and village areas to flood due to unclean rivers. Regarding Item 15100 – Coastal Erosion Prevention. Sarawak is one of the largest states and also has a very long coastline. I also wish to ask the Minister whether there is a project for the Parlimen Sibuti constituency for the year 2020, especially for the problem of river erosion at Pantai Tusan, Pantai Bakam, Kuala Sibuti and also Kuala Niah. Given that these areas are suffering severe erosion and are also burdening the fishermen. Apart from that, I would like to mention Item 15300 – Dredging of River Mouths. I would like to ask the ministry, what is the status of the proposal to dredge the Kuala Sungai Miri. Given that this project has been promised many times by the previous government and also the current government. This is because this river mouth needs to be deepened so that the shipping industry can be implemented. Apart from that, what form do the small projects to dredge river mouths in the Parlimen Sibuti constituency for the year 2020 take. I also hope that Pantai Bakam and also Pantai Bungai in Parlimen Sibuti will be listed in the 2020 projects. Apart from that, I would like to mention Item 050300 – Giant Panda International Conservation Programme. Thank you. Last year the Honourable Minister was in the House. This year too the Honourable Minister is in the House. I will mention the same matter regarding this Panda Conservation. This pair of pandas has been in Malaysia for five years and we have also allocated a large budget to care for this panda family. One baby panda has been returned. I also wish to ask the government, what are the results of the conservation that we have obtained from caring for these pandas? If this pair of pandas gives birth to a new baby, will the government name this baby panda using a local name or a name with Malaysian elements? Given that I see the names given to the two baby pandas that were born do not reflect the relations between Malaysia and also China. Apart from that, this may be an easy matter. Given that these pandas only live in Kuala Lumpur and not all Malaysians can enjoy and also see these baby pandas, does the government have a plan to display these pandas in regions such as Sabah and Sarawak? This would allow citizens who cannot travel to Kuala Lumpur to see and also enjoy this panda family. This is what I want to raise regarding the baby pandas. I would like to ask about Item 050400 – Star Rating, which has newly been established with RM1 million. What is meant by this RM1 million? Finally, regarding Item 02801 – Marking, Measurement and Maintenance of International Boundaries Project. Last year I saw there was a specific allocation to survey the Malaysia and Brunei border. I also want to raise again whether this allocation has been utilised, and also whether the government has obtained a final decision on the boundary between Brunei and Malaysia? For me this involves interests, given that the leaders of the previous government handed over Block L and also Block M, which have high oil content, to Brunei. Once again I ask. Once again I ask, will the government reclaim those blocks to be returned to the government. That is all, Mr Chairman. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Sibuti. Now I invite Honourable Papar first, followed by Honourable Parit Sulong. Please, Honourable Papar.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. In strengthening the management of water, land and natural resources in a sustainable manner for the well-being of the nation, the government has allocated a development budget of RM3.5 billion, whereas the previous year it was RM2.82 billion. This shows the new government's concern for the problems faced by the people. Item 15300, which is for dredging river mouths, has been allocated RM135.79 million. This budget is very much needed, especially in the state of Sabah, where in areas such as P.175 Papar, river mouths that are shallow need dredging. Yesterday, I received complaints from fishermen of Kampung Benoni, the place where I was born and raised, that they cannot go to sea to catch fish due to the shallow river mouth. This river mouth is shallow not because it was not dredged, but because the contractor who dredged it at that time was inexperienced. What I want to suggest here is let us look for experienced contractors so that such things do not happen. Today we dredge, tomorrow the river mouth will be shallow again. So what I want is for the ministry to give a directive that when we select contractors, we choose experienced contractors so that this does not happen twice. It is true that P.175 Papar has many shallow river mouth problems. This is always voiced by the village fishermen concerned when the water recedes; sometimes these fishermen cannot go to sea, as happened to the fishermen of Kampung Benoni a week ago, due to being unable to pass the shallow river mouth. The river mouths I am referring to are the mouth of the Papar River, the mouth of the Kinarut River, the mouth of the Benoni River, the mouth of the Kimanis River, the mouth of the Pengalat Besar and Bundusan River, the mouth of the Kinarut River and the mouth of the Beringis River. With the allocation available, I request the distribution of this allocation so that dredging of shallow river mouths can be carried out when needed. This requires regular monitoring so that all work can be carried out well. I also want to ask how the licence to dredge these river mouths is granted to applicants, in order to give opportunities to other applicants so that this work is not monopolised by one or two contractors only. Item 15400 – Environmentally Friendly Drainage River Management Plan has been allocated RM175 million this year, compared with RM69.9 million the previous year. This shows the government is indeed attentive to the problems of the people. So I propose, with the allocation available, that we strengthen the Papar River, where we can generate the economy and trading activities that can bring benefits and continuity to the Papar residents. It also gives potential for domestic and foreign tourism. All tourism activities can also be carried out along this Papar River, but it requires good and perfect infrastructure such as repairs to collapsing riverbanks so that we can bring foreign tourists to come to Papar. The Papar River will be more prominent when part of the waterfront project can be implemented by the government. Water sports events and other activities can also be held, and this will attract even more visitors to the town of Papar. Item 16700 – Flood Retention and Drainage Plan, allocated RM443.92 million. Many villages near towns and townships that experience flash floods every time it rains, and likewise many villages in the interior will receive the same fate. Imagine what will happen to the goods inside our homes when flash floods occur. These flash floods happen because of drainage that does not exist or is not systematic, due to the lack of allocation or funds to build and maintain drains and gutters to smoothen the flow of water during rain.

Recently I visited several flood-hit villages to see the condition of the victims and to give contributions to build and maintain drains and gutters to smoothen the flow of water. Imagine, as a people's representative, if we often face these flash floods, how much contribution we would have to hand out. In a year, we need a lot of contributions. So I request the ministry to give some funds so that we can carry out all the drainage problems faced by the people. So with this, that is all, and I support this budget.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Papar. Now I invite Honourable Parit Sulong, followed by Honourable Hulu Selangor, then Honourable Tanjong Manis and Honourable Merbok.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman. For the purpose of B.23 Item 020400 – Drainage and Waterways, and for the purpose of P.23 Item 15000 – Minor Works, Department of Irrigation and Drainage (JPS), Various States. A safe drainage system is important in our efforts to reduce the problem of flash floods. For my parliamentary area, U-shape concrete was approved in 2014 but its construction is only on one side of the road. So I want to request that the construction of this U-shape concrete be continued along the route from the Batu Pahat Bridge up to Semerah. My question to the ministry, when will this project be continued and extended? Next, I want to raise an issue regarding drain cleaning at Parit Jayus 4, Mukim 18, Sri Medan. My question to the ministry is whether the ministry will continue the work of deepening the drain involving the alignment in Sri Medan, namely from the town of Parit Sulong towards the Batu Pahat River, considering that previously the work of deepening the drain was only done halfway, involving only part of the alignment at the Sungai Kiri junction.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Parit Sulong parliamentary area, Honourable Minister, is an area that is often hit by floods. Therefore, is there any planning by JPS in steps to rehabilitate irrigation and drainage infrastructure in Batu Pahat, especially in the Parit Sulong area, comprehensively? Not just piecemeal. For the purpose of P.23, Item 13900 – Flood Control and Warning System Plan. I was once informed that the ministry at that time would implement the Environmentally Friendly Drainage Master Plan (PISMA) for the purpose of preparation or readiness to face the threat of flash floods around Jalan Rugayah, Batu Pahat. So my question regarding this matter is, what is the status of the preparation of PISMA for the Batu Pahat District area? To what extent has it been used as a guideline for the local authorities in tackling the problem of flash floods around the Batu Pahat area? Next, my related question is how the cooperation carried out by the ministry through JPS together with the Batu Pahat PBT to ensure that this drainage problem can be addressed more consistently and avoided in stages? Is there any planning or development plan to control floods in areas that have the potential to flood and that often flood within the Batu Pahat area, especially for the Parit Sulong parliamentary area and also the Batu Pahat parliamentary area as well? Because we are neighbours and we are adjacent. For the purpose of P.23, Item 02803 – Establishment of Utility Mapping System. The establishment of utility maps is very important. Its purpose is that it- in carrying out development projects and so on. So my question to the ministry is, how does the ministry assess its importance, and is there a plan to establish utility maps across all rural areas, especially in the Parit Sulong parliamentary area? Will the ministry allocate a sum of funds to help the two PBTs located in the Parit Sulong parliamentary area, namely the Batu Pahat Municipal Council and the Yong Peng District Council, to develop these utility maps?

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Next, Item 08100 – Herbal Product Development Centre. Is there any cooperation between the ministry and the Ministry of Health in conveying information to the public about the benefits of this country's natural herbal products? How does the ministry convey and inform the people of the list of herbal products that are safe to use? The next question is, how will the ministry or the Herbal Technology Centre (HTC) act as a dynamic herbal production centre that will become a replacement for traditional herbal products that, until now, remain the choice of society? Lastly is Item 08601 – Planting of Mangrove Trees and Suitable Species at Coastal Shorelines (Forestry Department of Peninsular Malaysia, JPSM). For this item, I want to ask for more attention from the ministry because I have mentioned this matter many times in this august House. In my area, there is an area called Teluk Wawasan, and Teluk Wawasan has mangrove trees that are more than 100 years old. However, this area has not received attention either in the form of conservation or preservation. I see it as one of the very valuable natural ecosystems that we must preserve. It is not easy to find plants that are more than 100 years old. It should be gazetted as a mangrove reserve area like a forest reserve. So my question to the ministry is, has there been any effort by the ministry to help develop and preserve the mangrove reserve area in the Parit Sulong parliamentary area? In this area there is also an old jetty. Perhaps the ministry could visit the site and see how it can be potentially developed into a mini recreational or ecological area that indirectly can give general knowledge to the community visiting the area. These are among the matters I can raise in this debate, Mr Chairman. Thank you very much.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Parit Sulong. Now I invite Honourable Hulu Selangor. I will start with five minutes because many others have requested to write in to debate. Please, Honourable Hulu Selangor.

Puan June Leow Hsiad HuiPKR · PHHulu SelangorEN

Thank you, Mr Chairman. Before I begin my debate, I would like to welcome students of the Bachelor of Laws from the International Islamic University Malaysia (UIAM) from Gombak... [Applause]

Mr Chairman (Dato' Mohd Rashid Hasnon)

Selamat datang.

Puan June Leow Hsiad HuiPKR · PHHulu SelangorEN

Thank you, Mr Chairman. I will go straight to the Supply Head B.23 Item 060200 – Maintenance and Repair. What categories of applications are there under this allocation? How can one apply for this allocation? I propose that a fixed allocation be provided to carry out periodic maintenance of facilities under the ministry. Item 050000 – Special Programmes. Does the ministry not have any special conservation programmes, particularly for wildlife in Malaysia? I request that the ministry focus on wildlife such as tigers and tapirs that are increasingly becoming extinct in our country. Moving on to Development Head P.23 Item 07100 – PERHILITAN (Department of Wildlife and National Parks), which received an allocation of RM53 million. In Hulu Selangor, there is a Sungai Dusun Wildlife Conservation Centre that is increasingly dilapidated. Applications to upgrade the wildlife enclosure buildings, upgrade the pre-release enclosures, the problems of electrical wiring and air conditioning, the leaking piping system, as well as staff quarters also need to be upgraded. The application has been raised, but until now it still has not received an allocation.

Puan June Leow Hsiad HuiPKR · PHHulu SelangorEN

Moreover, the vehicles used to rescue wildlife are also dilapidated. This is very disappointing because this centre is very important for protecting wildlife such as the tapir, which is now threatened with extinction. The tapir is also an icon of the Hulu Selangor district. I request the ministry to come down to the ground and visit to see the problems at this centre for itself. If upgrading can be carried out, Hulu Selangor is confident it can make this centre one of the tourist attractions, which would indirectly boost the local economy. For Item 14200 – Structural Rehabilitation, I would like to obtain information: what type of rehabilitation will be carried out and what will it be used for under this allocation? Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation, as well as Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. Through these items, it seems to be only for towns. What about RTB for rural areas? In Hulu Selangor in 2012, there was a major flood caused by the Sungai Batang Kali basin, when the flood embankment burst and was damaged. More than 1,000 houses and residents were badly affected by this major flood. Property damage exceeded RM50 million. Applications to repair and upgrade have been submitted, but until now there has been no action. I request the ministry to prioritise this application to reduce the impact if another major flood occurs in this area. Next, Item 15000 – Minor Works, JPS (Department of Irrigation and Drainage), Various States. It is suggested that this allocation also be used for periodic cleaning works at river areas and RTB. I request that periodic maintenance be given priority because in Hulu Selangor flash floods often occur due to clogged drains. I request the ministry to look into this issue. Finally, Item 15400 – Environmentally Friendly Drainage River Management Plan. It is seen that the allocation for this item has increased by RM106 million. What is the government's plan for this allocation? Does this plan also involve the Hulu Selangor area? The Felda Sungai Tengi Selatan area often faces extremely low water pressure, especially during the festive season.

Puan June Leow Hsiad HuiPKR · PHHulu SelangorEN

I request the ministry to resolve the problem that has existed here for a long time. On behalf of the people of Hulu Selangor, I would like to invite the Honourable Minister to visit Hulu Selangor. With that, thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Hulu Selangor. Now I invite the Honourable Member for Tanjong Manis, followed by the Honourable Member for Merbok, the Honourable Member for Jerantut, and the Honourable Member for Batu. Please proceed.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Thank you, Mr Chairman. I will go straight to Item 15000 – Minor Works, JPS, Various States. From RM22 million in 2019 to RM100 thousand. I hope the Honourable Minister can review this amount because there is a lot of minor work carried out by JPS, such as repairing damaged embankments caused by coastal damage, which requires allocation to repair those embankments. Item 15100 – Prevention of Coastal Erosion. A sum of RM3.5 million for 2020, this is an increase from 2019. So, as I wish to follow up on my oral question the other day, perhaps the Honourable Minister could reconsider or give consideration to the two villages I mentioned, namely Kampung Sebako and Kampung Paloh, which are experiencing severe coastal erosion. Item 15300 – Dredging of River Mouths. The problem in my constituency and in other areas of Sarawak is that dredging of river mouths is rarely carried out. When a monsoon occurs, rivers become shallow due to the movement of sand in coastal areas.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

This makes it difficult for fishermen to return from the sea after catching fish. So, many have to wait until high tide before they can enter the river. Therefore, we request the ministry to pay attention to dredging several rivers in my area, such as Sungai Sebako, Sungai Penibung, Sungai Betanak, Sungai Penipah, Sungai Salah Kecil, Sungai Tekijong and Sungai Beruit. They are facing the problem of shallow river mouths, Honourable Minister. Item 14600....

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Member, excuse me, I ask that this video be shown with the full face of the Honourable Member for Tanjong Manis... [Mr Chairman refers to the display on the TV screen] Ah, now he's handsome…

[Dewan ketawa]

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

What a waste, what a waste, what a waste.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Continue, Honourable Member for Tanjong Manis.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

Have to ask for extra time.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

The people can see now.

Tuan Yusuf bin Abd WahabPBB · GPSTanjong ManisEN

[Laughter] Further items: Item 14600 – Pre-feasibility Studies. I tried to look in other items to see whether studies like the ones I mentioned, the NCES study or the Integrated Shoreline Management Plan (ISMP) study, are included in the pre-feasibility studies that have an allocation of RM5 million. So this is an opportunity for us to carry out a study, perhaps specifically for the state of Sarawak, especially an NCES or ISMP study, where we can give priority to coastal areas experiencing severe erosion. So perhaps it can be included in this budget. For further items: Item 29000 – Sarawak Water Supply Plan. According to the data I have, in 2019 there was RM80.9 million, but in 2020 there is no allocation at all; instead, there is a loan amounting to RM123.203 million. So, I would like an explanation from the Honourable Minister as to why there is no allocation for 2020, and instead a loan is given to the state of Sarawak. Finally, Item 95000 – National NRW. So, we hope there will be some allocation for the state of Sarawak because many of our pipes are old and we are experiencing leakages here and there. So, we have an allocation of RM365 million – so it is a large amount. We hope there is some for the state of Sarawak, especially for the Tanjong Manis area. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Tanjong Manis. Now I invite the Honourable Member for Merbok.

Thank you, Mr Chairman. I will go straight to Item 13400 – National Water Resources Development. I just want to ask the ministry about its position on rainwater harvesting systems, and how far the ministry's efforts have gone in making them an alternative water source, because it is understood that guidelines already exist from NAHRIM and also NADMA, and there are studies showing that this system has high reliability as well as return on capital (ROC), with permission, which is actually worthwhile in the short term. Next, I move on to Item 15000 – Minor Works, JPS, Various States. I have witnessed a very significant reduction from RM22 million in 2019 to RM100 thousand. So, I request an explanation as to why this very significant reduction has occurred, because in fact flash floods and so on often occur in these areas simply due to clogging and also sedimentation where maintenance has not been carried out. When we ask at the District Action Meeting, the common reason we hear is a lack of allocation. So, I request the ministry to look into this issue.

Next, I move on to Item 15100 – Prevention of Coastal Erosion. This is also one of the matters I have raised before, namely Tanjung Dawai. Tanjung Dawai is experiencing serious erosion along the entire Tanjung Dawai coastline, so I request the ministry to say whether this budget includes the Tanjung Dawai area too, because Tanjung Dawai is one of the areas with potential as a tourist destination. Finally, Item 16700 – Flood Mitigation Plan. I would like to ask about the status of the RTB applications for Sungai Petani and Sungai Bongkok. Although it is not within the Parliamentary constituency, it still has a slight impact on the Merbok Parliamentary constituency because it is in a nearby area. This is really the last one, yes. Item 06500 – Kedah State Water Supply Plan, which, it is understood, last year was allocated approximately RM1.7 billion, but in this budget book, for 2020 it appears blank. I request an explanation from the Honourable Minister. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Merbok. Now I invite the Honourable Member for Jerantut, followed by the Honourable Member for Batu, then the Honourable Member for Bachok and the Honourable Member for Ledang.

Whom did I see first, the Honourable Member for Kuala Krau or the Honourable Member for Jerantut? Noticed.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

The Honourable Member for Kuala Krau is among those at the back.

Which face did I see first? The Honourable Member for Jerantut or the Honourable Member for Kuala Krau?

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Ikut giliran.

Thank you, Mr Chairman.

If we go by these rules, the Honourable Member was noticed first. Noticed the Honourable Member for Kuala Krau...

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Noticed the Honourable Member for Jerantut.

Thank you, Mr Chairman, for giving me the opportunity to join in the Committee Stage. Just briefly, firstly about Item 030000 – Forest and Biodiversity Management. I refer to Item 030100 – Forestry, Peninsular Malaysia. We all know that forests are important to the sustainability of our lives. However, I would like to ask the Honourable Minister how much forest land in our country has still not been logged – the latest figures, not those from two or three years ago. If possible, the latest, and what steps have been taken by the Federal Government together with the state governments in helping state governments that have gazetted these gazetted forest reserves for certain purposes. This is because they have left these forests, and these forests have not been developed, so the state inevitably suffers a shortfall in revenue. So, is there any finding from the Federal Government on helping state governments to overcome the revenue shortfall experienced by the states? Taking the example of the state of Pahang. The state of Pahang has given an area of 4,343 square kilometres of the Taman Negara area in Jerantut, Pahang. This forest cannot be developed and cannot generate revenue. So 4,000 square kilometres is a large area. Moreover, the state government under the leadership of the Honourable Menteri Besar, Dato' Sri Wan Rosdy, has also gazetted 258,992 acres as rainwater catchment areas. This again has a major impact on state government revenue.

So if there is any assistance that can be given in a specific form to overcome this revenue shortfall, it would be the best step, indirectly encouraging state governments to conserve the forests in their states to ensure that this continuous water supply does not diminish. This is because we see that the lands – most of these lands are logged and developed, so the catchment areas become reduced. So, this land issue is indeed under the jurisdiction of the state government, I know, but perhaps with good cooperation, we may be able to overcome the problem of water catchment areas. The Honourable Member for Kuala Krau looks like he is about to stand up.

May I, Mr Chairman?

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Two and a half minutes more. Please.

Okay, thank you, the Honourable Member for Jerantut. The Honourable Member for Jerantut mentioned forest reserve land, but I would also like to remind the Honourable Member for Jerantut not to forget Malay reserve land, which is now said to have been reduced to only 12 per cent of Malay reserve land. I hope that, just as the Honourable Member of Parliament for Tambun fought to ensure this Malay reserve land can be retained, this is the wisest step taken by the Honourable Menteri Besar of Perak. I would also like to remind the Honourable Minister to remind the Menteri Besar of each state that this Malay reserve land is actually protected or safeguarded under Article 89 of the Federal Constitution. So, if Malay reserve land is taken for other development, it must be replaced immediately. If it is not replaced, it is not allowed. So, I hope the Honourable Minister can ensure that this Malay reserve land is not arbitrarily taken for development purposes if there is no replacement. I request the Honourable Minister also to state the area of Malay reserve land at state level that has not been replaced under the Federal Constitution. Thank you. Although that is a state matter, under the Federal Constitution you may answer.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Give you the chance, go ahead and speak.

Thank you, Mr Chairman. Please record that as my speech. Mr Chairman, I would like to touch on Item 030200 - Wildlife Protection and National Parks. Today we often hear about conflicts between animals and humans. So we see wildlife increasingly threatened, and indirectly it also threatens human life, both in terms of safety and in terms of the economy. If we look at the increase in wildlife deaths, it has risen. For example, in 2015 there were 6,258 cases; in 2017 it rose to 7,451. So, I would like to ask what the government's plans are in its serious efforts to protect these wild animals? Perhaps the government could propose to state governments the establishment of mini conservation centres to house certain animals. For example, in my area now, there is a conflict of wild elephant attacks on humans. So, I request, if there is an opportunity, that the Honourable Minister or the Honourable Deputy Minister come and visit the Jerantut Parliamentary areas themselves, which are now haunted by wild elephant attacks. One more thing I would like to touch on, Mr Chairman, just briefly. The day before yesterday, my colleague the Honourable Member for Kubang Kerian touched on the threat of monkeys or macaques – the local term here is kera and beruk – which are now really disturbing village folk. They cannot even grow crops, and they cannot even keep chickens and ducks because they cause so much disruption. So, the Department of Wildlife and National Parks (PERHILITAN) has taken action, but that action may be short-term. What is the government's solution to help these village farmers? Are we serious about overcoming the problem of monkey attacks in these villages?

Perhaps the Honourable Minister does not have very clear information, but it is indeed serious, and it really threatens most villages. So, Mr Chairman, thank you very much.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Jerantut. Now I invite the Honourable Member for Batu.

Tuan P. PrabakaranPKR · PHBatuEN

Thank you, Mr Chairman, and congratulations and well done to the Honourable Minister and the Honourable Deputy Minister who are also present. I will go straight to Item 020100 - Federal Land and Mines Commissioner's Department (JKPTG). Regarding government land under the administration of the Land and Mines Office, I see that it is necessary for the ministry to review the lands that have been granted premium leasehold rights, also known as TOL land, to companies that have long been established in an area. This matter has become a source of public dispute, and we at the People's Service Centre, Batu Division, frequently receive reports from residents in certain areas. This is because there are some parties who misuse the land to carry out unhealthy activities, and when these activities take place, they cause many impacts on the surrounding residents, for example air pollution, noise pollution and also water pollution. Lands that should be green areas or green land have also been granted premium leasehold rights to companies or any interested bodies. Here, I do not agree when the interests of the people are set aside. Therefore, my suggestion is that the ministry kindly review the status of lands that are to be granted leases, because the gap and scope of community needs are no longer the same as before. I also wish to record my request that this matter be resolved in the near future so that the community in the areas concerned can once again enjoy comfort and safety for themselves and their families. Item 020400 - Agricultural Irrigation and Drainage. I see that it is necessary for the Department of Irrigation and Drainage (JPS) to give me an answer as to why the water catchment pond, the Nanyang pond in Taman Wahyu, has come to resemble a rubbish disposal site. This is not the first time I have raised this issue in this honourable House. The surface of the water catchment pond is covered with rubbish, and this condition has persisted for a long period. The health of residents is certainly threatened by dengue and Aedes. For additional information, the developers in the surrounding area have helped the Department of Irrigation and Drainage carry out cleaning because the developers are worried that their development value will fall. So, I hope the ministry will be more attentive to this issue. Annex 15000 - Minor Works of JPS Across States. Meanwhile, when looking at the allocation given to JPS for Annex 15000 in 2019, the allocation given was RM22 million. Why was the estimated allocation for 2020 reduced to only RM100,000? This matter will directly disrupt the minor works of JPS. Item 80000 - National Sewerage Project. Wishing to know the status of the sewage treatment plant project in Kampung Batu Muda, which until now, as an elected representative, I have not known the status of, because I heard that the ministry has made an MACC (Malaysian Anti-Corruption Commission, SPRM) report on the project. If this is true, I would like an explanation from the Honourable Minister. I would also like to take this opportunity to obtain certainty from the ministry regarding what action the Federal Government will take after the Pakatan Harapan Government inherited old problems, such as problems in the Orang Asli or Indigenous village areas. The problem I am raising is what action the Federal Government will take regarding the water tanks that have been installed, and the piping system has also been completed, but the water supply is still not received by residents. For example, this problem can be seen in Kampung Air Pasir, Kampung Peta and Kampung Punan in Johor. I seek an explanation, thank you.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Batu. Now I invite the Honourable Member for Bachok, followed by the Honourable Member for Ledang, then the Honourable Member for Limbang and thereafter the Honourable Member for Petaling Jaya. The Honourable Member for Bachok, please.

Thank you, Mr Chairman. Peace be upon you, and the mercy and blessings of God. I will go straight to Item 030100 - Forestry of Peninsular Malaysia. First, I would like to congratulate the government on the increase in allocation to the Ministry of Water, Land and Natural Resources, namely RM1.3 billion for operating expenditure while RM3.5 billion is for development expenditure. I think this is a good development, showing seriousness towards the aspects of preservation and conservation of water, land and natural resources that are important to the ecological balance of the country. Under this Item, I would like to touch on several matters. First, regarding the forest area of this country, which still meets the commitment under the Rio Earth Summit 1992, with an estimated 18 million hectares of land covered by forest, comprising 55.3 per cent of the total, compared with the stated commitment of 50 per cent forest cover. Here I would like to obtain an explanation from the government regarding the steps that have been taken to continue the aspects of forest preservation and conservation.

To what extent has close cooperation been carried out together with the State Governments to ensure compliance with sustainable forest management practices and the replanting of forests that have undergone degradation and logging. I also want to ask about the demand for recreational development and eco-tourism, which is also important to ensure that forest conservation takes place sustainably, besides helping the management of forest landscapes. Next, in 2018, the Kelantan State Government gazetted part of the Permanent Reserved Forest (HSK) as a Water Catchment Forest, making it cover 20.97 per cent of the Permanent Reserved Forest, namely 128.6 thousand hectares of the total HSK. I would like to obtain an answer on what percentage of Water Catchment Forest there is across the whole country at present, and whether the ministry holds bilateral discussions with state governments so that more Water Catchment Forests are gazetted in their respective states. Item 030200 - Protection of Wild Forests, Wildlife and National Parks. I note an increase of nearly RM11 million for this item. As we are well aware, the problem of wildlife extinction occurring in our country today is increasingly serious, despite enforcement and the attention given by the responsible parties. The extinction of wild animals such as the Malayan tiger, the Borneo Pygmy elephant, the sun bear and the Sumatran rhinoceros and various other species continues to occur, driven by factors of illegal hunting and also forest destruction. I would like to ask what the latest total number of wildlife species in this country is, and what drastic steps the ministry will take to address the factor of rampant illegal hunting, as well as the factor of forest destruction that is occurring. When will the National Forestry Act 1984 and the Wildlife Conservation Act 2010 be amended to ensure heavier penalties for illegal hunters who are rampant at present. Next, Item 08600 - Sustainable Forest Management. I would like to obtain information on the total hectares of logging in the Permanent Reserved Forest carried out in production forest areas. How many licences have been issued for the period January until October this year, and how many hectares of illegal logging have occurred within the HSK area.

Likewise, logging outside the HSK that is intended for land development and undergoes complete clear-felling. How many hectares of land have been used for logging activities, and to what extent is the government's control to ensure that logging outside this HSK obtains approval of an Environmental Impact Assessment (EIA).

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

30 seconds left.

Next, Item 20000 - Kelantan State Water Supply Scheme. I note an increase in allocation under the item Kelantan State Water Supply Scheme from RM8.8 million in 2019 to RM13.6 million. Therefore, I would like to ask about the planning of the Treated Water Plan, especially in the State of Kelantan. Does this allocation also detail the planning to ensure treated water supply is distributed to the Kelantan State Government. I also want to obtain an explanation from the State Government regarding the water supply sources of Kelantan at present. To what extent is the threat of a shortage of water supply resources that the State of Kelantan may face, and if it exists, what is the ministry's plan to overcome this problem. I request one more, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Sila.

Item 020000 - Water, Geology and Land Management. I would like to request an explanation from the State Government regarding Malay Reserve Land. Up to 2017, the estimated Malay reserve land area was 4.3 million hectares or 33.3 per cent. Although the area has increased, it has still not reached the percentage rate set by the will of the Malay Rulers, namely 50 per cent. I think this percentage rate can be achieved if all parties comply with the State Malay Reserve Enactment and the Federal Constitution. Based on the use or revocation of the status of Malay reserve land, it should be replaced in accordance with the same type and area. If there is no replacement, then the use or revocation of that status is invalid. I want to obtain details of how much Malay reserve land has had its status revoked under the Land Acquisition Act 1960 and the applications of the state authority, and if it has been revoked, how much has been replaced. Thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Bachok. Now I invite the Honourable Member for Ledang.

Thank you, Mr Chairman. Peace be upon you, and the mercy and blessings of God. I have five matters I wish to touch on. First, Item 020400 - Irrigation and Drainage. I find that there is a slight increase in the 2020 Budget to RM8 million additional from RM100 million to RM108 million. However, on this matter I want to raise the issue of drain maintenance, where in Johor State there are indeed many drains, and I think also in Kedah, perhaps in Perak and elsewhere. So I hope this matter can receive attention because in the Budget this year the allocation given is RM2.5 million whereas the application was RM5 million. They only received half of the allocation they had applied for. Therefore this causes drain maintenance work to be infrequent, and sometimes perhaps only once or twice a year, causing many of our drains to look like forest and possibly causing the risk of flooding. So I have proposed to JPS that at least there should be scheduled notification to village heads, penghulu, state assemblymen (ADUN), so that they know when this work will be carried out and it can be monitored. I also propose that we perhaps review the maintenance contracts, to see what method can allow this to be carried out more frequently without involving excessive costs. I also want to propose that this allocation be given according to the area of drains and also the risk of flooding.

The second matter is Item 150000 regarding minor works of JPS. I think this has been raised by the Honourable Member for Kuala Kangsar this morning as well, namely that the allocation has been reduced greatly from RM22 million to only RM100 thousand. I want to raise this matter because it is related to the issue of water supply disruption linked to electricity supply disruption in my area at the end of September. The disruption caused thousands to be affected for three days, and this disruption was found to be due to the absence of generator set supply at the water pump house. So when that happened, they had to wait for a long period, and only after electricity returned could water be supplied again to the affected areas. So I ask that there be allocation perhaps for the provision of generator sets so that all these pump houses, if there is an electricity disruption, will trigger the water supply again. Thirdly is regarding Item 060200 - Maintenance and Repair. This concerns the maintenance of jetties along the riverbanks of the Muar River, especially for Kampung Rawang, Kampung Berlemang, Kampung Kolam, Kampung Teluk Kemang and also Kampung Pantai Layang, where most of these jetties were previously built and developed by JPS but now they are abandoned and in fact many of these jetties can no longer be used. So, I seek the attention of the ministry to look into maintenance. Fourthly, Item 040100 on water management. I have previously raised in this honourable House the issue of treated water supply for Sekolah Kebangsaan Puteri Ledang, where this school is located not far from Pekan Sagil, about four to five kilometres, but they have all this time received untreated water from Gunung Ledang. Previously this water was clean, but now there is indeed a pollution problem, so it needs a treated water supply. So I inform the ministry that SAJ (Johor Water Company) has in fact offered to supply water as a CSR project, but I ask to know what the progress of this project is. Lastly, Item 07100 - PERHILITAN (Department of Wildlife and National Parks). This has also been raised by several Honourable Members earlier regarding the issue of pest animals. While we want to ensure that these endangered species are protected and also ensure they are preserved, we also have a problem with pest animals that may have left their areas because they have been encroached upon by humans.

Thus, they have entered human areas, into crops and plantations. Indeed, I have received a report that there are monkeys eating lamps. No longer just eating crops, but eating lamps. As if they no longer have food. So, what action will PERHILITAN and other agencies take to resolve this problem thoroughly? So that there is a complete solution that we can also carry out well, and it does not recur. The Honourable Member for Kepong asks for the floor...

Tuan Lim Lip EngDAP · PHKepongEN

Yes, yes, I would like to add a question.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Briefly, please.

Tuan Lim Lip EngDAP · PHKepongEN

Yes, brief. This concerns Item 030100, totalling RM32 million. I would like the ministry to explain, in Kuala Lumpur, what allocation there is under this item? Specifically Hutan Bukit Nanas? Thank you.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Kepong. Please, the Honourable Member for Ledang.

Actually that was the last one, Mr Chairman. Thank you. I have raised the five items just now.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Alright, thank you, the Honourable Member for Ledang. Now I invite the Honourable Member for Limbang, followed by the Honourable Member for Petaling Jaya, the Honourable Member for Gerik, the Honourable Member for Sandakan and the Honourable Member for Arau.

Datuk Ugak anak KumbongPRS · GPSHulu RajangEN

Can I later ask for Hulu Rajang a little? Can? Two minutes?

Thank you, Mr Chairman. I will go straight to B.23, Item 020400 - Irrigation and Drainage. I would like to touch on the river conservation programme. So, for Limbang, I have discussed with JPS at least RM1 million for next year. RM1 million is needed to clean the rivers under the river conservation programme for the Limbang Parliament. Second, I go straight to P.23, Item 15300 - Dredging of River Mouths. So, this story is about dredging the mouth of the Limbang River. This programme has actually been around for a long time, to dredge the Limbang River mouth which is now getting shallower. Many more- I mean it affects the whole river, Honourable Minister. If it is at the back, along the river, now it is getting shallower. Previously, because of the EIA because the river mouth is affected by the Brunei... So, they requested for EIA and the EIA has been completed. Just that, because of decisions the EIA report lapsed. So, we are informed that the JPS Sarawak has requested an exemption to do the EIA again, that will take time again. So, its status at this time, I am informed the project for dredging the Limbang river mouth is now awaiting the decision of JPS Malaysia for tender and the cost is RM10 million. So, I want to know what its status is now? [Deputy Speaker (Tuan Nga Kor Ming) chairs the Committee] At least we know, because people ask when, when, when. This story has been around for a long time, which actually came from the previous government. Next is P.23, Item 16700 - Flood Mitigation Plan (RTB) and Urban Drainage. At this time I am also informed that the Limbang River has a flood mitigation programme for the Limbang River because it is also related to the siltation of the Limbang river mouth which is causing frequent flooding now. All the villages along the river, now when the tide is high, it is very high, it has reached the floor. This is in the town itself. So, I am informed the allocation ceiling for the flood mitigation of the Limbang River is RM21.67 million and is reportedly at the study stage. So, I want to ask the ministry here, what is the status of this study? At what stage and when will it be implemented in- and when are you going to complete the study and when do we start the flood mitigation works? That is all, Mr Chairman. Thank you.

Deputy Speaker (Mr Nga Kor Ming)EN

Thank you, the Honourable Member for Limbang. Now I invite the Honourable Member for Petaling Jaya. I hope everyone will keep to time because there are 41 Members of Parliament who are interested in debating, and the Honourable Minister will wind up at 5 o'clock in the afternoon. The Honourable Member for Petaling Jaya, please.

Puan Maria Chin binti AbdullahPKR · PHPetaling JayaEN

Okay, thank you, Mr Chairman. Referring to Item 15200 - Improving, Beautifying, Cleaning and Treating River Water and Infrastructure. The problem of river pollution due to illegal rubbish dumping, which is increasingly rampant in Malaysia, is very worrying. Not only because it has undermined the quality of the environment, but also because it has affected the ecosystem and the lives of residents living nearby.

Puan Maria Chin binti AbdullahPKR · PHPetaling JayaEN

I will use the rivers in my constituency, Petaling Jaya, as an example. Two incidents occurred last July. Several hundred dead fish were found in Sungai Kayu Ara as a result of river pollution activities carried out along that area. Second, as reported by Sinar Harian in a video, several lorries full of construction waste were dumping rubbish illegally into Sungai Klang around PJS 3, Taman Medan. Several reports were made but failed to stop the dumping of rubbish into the river. It was found that the action taken had no effect at all on this illegal activity. Therefore, I would like to ask how far enforcement action and the formulation of more effective laws have been taken against the dumping of rubbish into rivers? What steps have been taken by the ministry to ensure that there is continuous monitoring of this activity? Besides that, how are the provisions made here to protect our rivers from illegal rubbish dumping? Item 16700 – Rancangan Tambatan Banjir (RTB) and Urban Drainage. I have several questions. The first is, can the ministry state the latest status of the development of the integrated system for weather and flood forecasting as well as early flood warning? What about the implementation of the Flood Mitigation Projects? Besides that, how many Flood Mitigation Projects have been approved and completed so far? In areas of Petaling Jaya such as Jalan Universiti, TTDI Jaya, U2 and other places in the Petaling Jaya district, flash floods are expected to occur. So, what appropriate action will the government take to ensure that flash flood disasters do not recur during this monsoon season? Will the government review the existing irrigation and drainage systems in order to further upgrade them into a more effective and perfect system, including the proposed construction of more flood retention systems to accommodate the quantity of rainwater? Thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Petaling Jaya. Now I invite Honourable Gerik. After that, Honourable Sandakan.

Thank you, Mr Chairman. Under Supply Motion 23, Item 020200 – Survey and Mapping Malaysia. I seek the ministry's cooperation, since this is a state matter, but at the ministry level we must ask for help regarding incorrect land measurement, mostly in rural areas. If we look at the original plans, some houses are located in Plan B, but if we want to correct them again it requires expenditure. This is why I ask, if possible, that the ministry provide a budget to correct the measurements of the relevant lots. Item 020300 – Minerals and Geoscience. I would like to ask the ministry, especially about mineral water coming out of Johor and also Pahang, which we know has had contamination issues recently. Many people on the ground have mentioned the possibility that chemical substances have entered, so people are rather worried about buying mineral water produced in the states of Johor and Pahang. The second point under minerals: I ask how the Federal Government can sit together with the state governments, given that today we see sand being exported in large quantities from within the country, whether bought by foreign countries.

So, this will also have an impact on pollution within the country. Likewise with mines, where in my own area of Gerik, in Hulu Perak, tin mines are visibly causing pollution. How can the Federal side and the state cooperate?

Next, Item 020400 – Drainage and Irrigation. I would like to ask about the flood mitigation approval in Gerik, whose ceiling of RM200,000 was approved last year. So far, what is the position when the flash flood recently occurred? It has caused considerable worry among residents in the Gerik Parliamentary constituency. Item 030100 – Peninsular Malaysia Forestry. I would like to propose that the Federal Government cooperate with the state to gazette catchment areas that have not been gazetted. This is where the large timber areas are. So if we can gazette them, it will save the rivers from being polluted, especially in rural areas. I would also like to ask under this timber item. How much is the agreed quota between the Federal Government and the states each year? I understand there is a quota for timber that can be extracted in every state except Perlis, which has no timber. However, Perak and Pahang have quotas. If there were no quotas, it would cause each of these states to extract more timber, which becomes a source of state revenue, but it would damage the future of our states. The next item, 030200 – Wildlife Protection. I would like to ask the ministry: once upon a time, there were Sumatran rhinoceros in the Royal Belum area. But today it is understood they have become extinct. What action will we take to re-establish these extinct Sumatran rhinoceros? Perhaps we could take seeds from Africa and make the Royal Belum area have Sumatran rhinoceros again. The next item, 030400 – FRIM. I would like to say thank you...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatangan

Boleh celah?

Boleh.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Yes, Honourable Gerik. Perhaps the Honourable Gerik heard earlier that the Honourable Ledang stated that monkeys eat lamps. So, could the Honourable Gerik also inform the House that since this new government, all sorts of things have happened. The Sumatran rhinoceros are no longer here and the monkeys are also hungry. Not only humans are hungry, animals are hungry too, during this government. The lutong are even hungrier.

Mr Chairman (Tuan Nga Kor Ming)EN

Does the Honourable Kinabatangan have Sumatran rhinoceros?

That's right, Honourable Kinabatangan. If we look at recent years, it is rather strange. All sorts of things. Lutong eating bananas is normal, but if lutong go and eat glass, that is quite worrying. Mr Chairman, I would like to thank the ministry for choosing my area for the Bunga Padma Project, or, as I would say in English, which sometimes twists my tongue, between FRIM and FGV. However, I do not know how far its progress has gone. But I am very proud. I know that in the Gerik Parliamentary constituency there are more than five or six species of Bunga Padma that we can compete with on the world stage, because once upon a time the Gerik area was in fact a Bunga Padma area. So I thank FRIM and also FGV very much for providing about five acres of land. If it succeeds, I ask that they make an advertisement so that people can come to Gerik to see how the Rafflesia flower looks. This one I also find difficult to say.

Mr Chairman (Tuan Nga Kor Ming)

Rafflesia.

Bunga Pakma is the village term. In the past, this Bunga Padma was cooked to shrink the womb of women who had given birth. We used this Bunga Pakma. So, one last item: Item 80000 – National Sewerage Project. I see that the people have to pay the sewerage bill every month, but the sewerage service is questionable. Perhaps the Honourable Minister could explain so that there is no noise among the grassroots about sewerage. Thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Gerik. Now I invite Honourable Sandakan. After that, Honourable Arau.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Speaker. I would like to raise two issues in my debate today. First of all, I would like to refer to page 235, Item 2800 under the Sabah Water Supply Scheme, and also Item 9500 under National NRW, where the estimate for 2020 increased from RM131 million to RM365 million. I would like to ask the ministry, how much of this estimate will be spent in Sabah to reduce non-revenue water (NRW), with permission, which is so high in Sabah, where the NRW figure for 2018 for all of Malaysia was 35 percent and Sabah's NRW was as high as 52 percent. For the information of the Honourable Minister, one of the main facts behind the high NRW in Sabah is that there are still many pipes that are obsolete and still operating from the old days until now. These pipes often leak, which causes disruption of water supply and directly contributes to the high increase in NRW. There are 19 percent, or 227 kilometres out of a total of 1,200 kilometres of pipes in Sandakan, that have exceeded 20 years of age. It is time for these pipes, especially those that frequently burst and leak, to be replaced. In addition, the 900 MM transmission pipe from the Bukit Garam Kinabatangan water treatment plant delivers approximately 52 million litres a day to Sandakan. This pipe began operating in 1988. Some of these pipes were laid through areas that were formerly oil palm plantations. As time passed and after reaching 30 years of operation, the surroundings of the pipes laid in this area have begun to be overgrown with bushes and become swampy, and are not easily accessible by vehicle. It is feared that this pipe has leaks that cannot be detected and contribute to the high NRW. Therefore, relocating this pipe route is a necessity to avoid undesirable matters such as prolonged leakage and wastage, and to facilitate monitoring and inspection work. The problem of water shortage in Sandakan, Sabah, is a problem that has long burdened the people. It not only disrupts the well-being of the people but also causes Sabah to lag far behind the Peninsula. It also directly affects economic development because of the lack of confidence among foreign investors to invest in Sandakan. Two months ago, the record for water supply cuts was three to four days continuously. Hence, I want to firmly emphasise that the Honourable Minister examine the NRW issue in Sabah and allocate sufficient funding to reduce NRW to a lower level. Second, I would like to refer to page 232, Item 10804 – Heart of Borneo (HoB) Programme for the State of Sabah, where RM5.7 million has been allocated for 2020. Based on the figures stated, RM5.72 million and RM5.23 million were allocated for this programme in 2018 and also in 2019. Therefore, I would like to ask the Honourable Minister, considering that the Heart of Borneo initiative agreement was signed in 2007 between Malaysia, Indonesia and Brunei. What results have been achieved from this initiative so far? How can this initiative benefit Sabah and Malaysia as a whole? Thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Sandakan. Now I invite Honourable Arau. After that, Honourable Nibong Tebal.

Thank you, Mr Chairman, the honourable one, the future Secretary-General of DAP.

Mr Chairman (Tuan Nga Kor Ming)EN

The future President of UMNO.

First of all. Hah! President of UMNO, God willing. First of all, Item 020200 – Survey and Mapping Malaysia Unit. I ask that an answer be given regarding the status of Pulau Brasmana.

When I was little, Pulau Brasmana was part of Malaysia, part of Perlis. When I grew up, I saw that suddenly the island went in and out of the Thai area. So, in remembrance of the name Brasmana, we built a hotel and named it Hotel Brasmana. So we ask that, regarding the agreement that is used, is it accurate that Pulau Brasmana and Bukit Putih are located in Thailand? Bukit Putih is in Malaysia, but we see there are several places where Thai territory was included in Malaysia. For example, at Bukit Kuancu, Bukit Kencana in Padang Besar, the temple belongs to Thailand, but- the temple is Malaysia's but it is considered Thai territory because there is an exchange agreement, exchange, exchange and so on. If mapping can be exchanged, exchanged like that, then I ask that Brasmana be included under Perlis. The second is Item 31000 – Perlis State Water Supply Scheme. Perlis is the state with the highest non-revenue water, at 63 percent. Kelantan 49 percent, Kedah 48 percent, and the national average is 35 percent. Perlis 63 percent. We are given an allocation of RM14 million, which I think is insufficient. So I earnestly appeal to the Honourable Member to increase it to RM28 million. Third, Honourable Member, is regarding forestry. Forestry, for the Honourable Member's knowledge, Malaysia carried out a tree-planting campaign of 26 million trees, carried out on 22 April 2010. Until 2012, the record seen on Google shows that we had planted 15 million trees. So, I want to ask, what is the status of that campaign now? I would like to suggest to the Honourable Member that you will be known throughout the world after this that we set a target of one million acres. Honourable Member, if it is one million acres, if we plant rubber trees, we get 180 to 200 trees per acre, forest rubber, yes. So, we get 180 million trees. If we plant other trees, perhaps around 100 trees, but for the existing forest areas, the timber we get is about 10 trees per acre. If it is one million acres, we get 10 million, but we set a target of 100 million. For 100 million, we need to obtain an area of one million acres. Honourable Member, this is not an impossible matter. We once gave land to a businessman in Sarawak of about one million acres, and he has produced several Members of Parliament here who succeeded, and their success was because they also had plantations of one million acres in the state concerned.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Honourable Arau, briefly.

So I propose that the government set a target of one million acres of timber area, and we will set a target perhaps of five years or 10 years or six years to achieve it, yes.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Honourable Kubang Kerian, briefly.

Then the next is FRIM. Honourable Member, I propose that...

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Honourable Arau.

...One FRIM for one Parliament. Because nobody dares to steal from the FRIM area. If there is one FRIM for one Parliament, it would be very nice, because FRIM in Malaysia is among the best in the world. Yes, Honourable Kubang Kerian.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

I ask for a little comment from the Honourable Arau regarding the entry of timber brought into Malaysia which has become a threat to our forests. For example, acacia mangium, which was brought in and later became a threat to our forests. Perhaps this matter can be looked into. Thank you.

Honourable Minister, please look into it. This is among my speech points. Put it into this most outstanding speech.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir Salak

[Ketawa]

Then, under emoluments for contract staff, RM1.3 million. Honourable Member, I propose that we establish contract rangers. Because the rangers we have now, some of them when we recruited them were young and strong, but now that they are older, they are less strong. Except for a few people in Malaysia who are still strong in their later years, such as the Prime Minister, here and there and so on. So, we ask for an increase in emoluments for contract staff. Then the next one, Honourable Member, is regarding the JPS. Honourable Member, you hold on to my slogan, yes. Cheaper to take care of health than to take care of illness, Mr Chairman. Taking care of health may only cost RM1, but when one is sick, it is thousands. The same goes for the JPS. It is cheaper to look after water resources than to go and carry out flood mitigation. Flood mitigation costs RM2 billion but still does not guarantee that floods will not occur, but if we look after water resources with RM2 billion, one whole country can be safe because the water resources will ensure that floods do not occur. Why? We must remember, if water resources are not looked after, this is what will happen. Then, last of all, Honourable Member. The last one, there is no item. This is the final one. The first, I protest about the five-minute, three-minute cases, Honourable Member. Never. Previously, Honourable Member was here, and I was there. I was the Parliamentary Minister, I gave the widest possible space.

Dato’ Dr. Xavier JayakumarPKR · PHMinister of Water, Land and Natural Resources · Kuala LangatEN

No item, how do I answer this?

The last one. No need to answer, Honourable Member. Then the second, I protest against the Election Commission (SPR) because it made rules that even PH finds difficult, and we also find it difficult. Lastly, Honourable Member- this must be said, yes. Honourable Member, today is the saddest day in the world for me. Why? The Most Honourable Langkawi is a person respected as a respected Prime Minister, but today he no longer has the support of DAP. Since DAP has not taken action against Ronnie Liew...

What item, what item?

...So we see...

Stop talking nonsense. That's enough.

Dato’ Dr. Xavier JayakumarPKR · PHMinister of Water, Land and Natural Resources · Kuala LangatEN

This item is not included, Mr Chairman...

Mr Chairman (Tuan Nga Kor Ming)EN

When the Honourable Arau talks nonsense, it is to relieve the feeling- staying up late, but that will not be recorded in Hansard. The Honourable Minister does not need to answer. Please.

Honourable Member, before I bring up P.M. 36(12), Honourable Member should be careful. The last time, perhaps DAP is taking revenge because BERSATU did not take action against Peja. So, did not take action... [Microphone switched off]

Mr Chairman (Tuan Nga Kor Ming)EN

Honourable Arau, what does this have to do with the Ministry of Water, Land and Natural Resources? Where is the Standing Order on that matter? No need to answer that. Thank you, Honourable Arau. Now I invite the Honourable Nibong Tebal. Thank you, Honourable Arau.

So this means what has happened is no longer genuine. Yes, thank you.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

Honourable Arau, that is enough, Honourable Arau.

Shut up you.

Mr Chairman (Tuan Nga Kor Ming)EN

Please, Honourable Nibong Tebal.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

Thank you, Mr Chairman. I would like to begin with Item 020100 – Department of the Director General of Federal Land and Mines (JKPTG)...

Dato’ Haji Salim SharifUMNO · BNJempolEN

Honourable Member looks healthy, yes, Honourable Member. Okay, okay. Alhamdulillah.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

...which has been allocated RM96.26 million. Among the main duties or main functions of JKPTG is to manage the distribution of small estate matters. I want to touch on this matter together with Item 050500 – e-Tanah System of the Federal Territory and Item 02301 – e-Tanah Project, which has been allocated RM26 million. Mr Chairman, this e-Tanah system was established in the early 1980s with the main aim of modernising land administration through computerisation of land administration, with permission, in order to produce efficient administration to provide the best service to the people. So my question here, Mr Chairman, after about 30 years since this system was implemented, what is the capability and readiness of this system to, first, generate important land data for the purposes of planning and implementing programmes, specifically on three matters. The first is small estate land. These lands often haunt our society in rural areas especially, and likewise in urban areas too, when for several generations the problem of estate matters cannot be resolved. So if the e-Tanah system is capable of generating the status or distribution of these estate lands, then the ministry or JKPTG can look for ways to address this issue so that it can be resolved as quickly as possible. This indeed haunts our residents in interior areas. The second concerns data on waqf land. We understand that this land issue is a state government issue, but if JKPTG can coordinate and harmonise the generation of data through this e-Tanah system, then we can obtain detailed information, initial information, for the purpose of planning development on waqf lands, which has been a major issue that we have discussed in this House for a long time. That is the second. Likewise, the third concerns issues of abandoned land. We have often raised this question through the Ministry of Agriculture, about what we are going to do with abandoned land.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

However, we do not have complete data on the status of this land. Where it is, who owns it, how large it is. But I believe that if the e-Tanah system can generate this data for the use of other departments and ministries, then our task of planning and implementing programmes for the benefit of the people can be carried out promptly. That is the first. The second, Mr Chairman, I would like to touch on Item 15300 – Dredging of River Mouths, with an allocation of RM135.8 million, a fairly large allocation. I would like to express my thanks and appreciation to the ministry for being so concerned about this matter. The issue of dredging river mouths is indeed a very important issue for coastal fishermen in particular. They cannot go out to sea, and cannot return at the times they wish.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

They have to depend on the water situation. Only when the tide is high can they go out or come back. So this is a very urgent issue for protecting the interests of fishermen, and I would like to request the ministry to give attention to my area in Nibong Tebal, namely Sungai Changkat in the DUN Jawi, Nibong Tebal. The third, Mr Chairman, concerns Item 11900 – National Groundwater Resources Study. An allocation of RM23.1 million. So I would like an explanation from the ministry on what projects are being implemented or planned for implementation for the benefit of the people under this heading, in the national groundwater resources study. Is the ministry now also trying, in its R&D, to find alternative materials or alternative sources to conventional sources? For example, obtaining water from the atmosphere, such as technology from Spain, for example. This has already been implemented in India and in several other places. I believe that if this technology can be implemented, then we can solve water supply problems especially in interior areas of Sarawak and also in Sabah, which have so far only relied on blue drums. The next, Mr Chairman, concerns the Water Supply heading, Item 06400 to Item 31000, which has been allocated a very large sum, RM451.4 million, which includes grants as well as loans. In this aspect, water supply plans to states throughout the country. Could the ministry give me some explanation, especially on the plan for water supply in the state of Penang...

Tuan Sabri bin AzitPAS · PNJerai

Sikit sahaja...

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

...That is all, thank you.

Tuan Sabri bin AzitPAS · PNJeraiEN

Eh, is it over already?

Mr Chairman (Tuan Nga Kor Ming)EN

It is finished. Now I invite the Honourable Maran, followed by the Honourable Jeli. Please.

Thank you, Mr Chairman, for giving me the opportunity to debate the Supply of the Ministry of Water, Land and Natural Resources. I want to touch on several matters concerning this ministry's budget. The first is the Flood Control and Warning System Programme, Urban Infrastructure and Drainage Upgrading, Flood Mitigation and several others. For the information of the House, we are well aware that floods are a disaster that occurs every year in our country, and Maran is no exception, because Maran lies on the edge of the Pahang River and many areas are affected by this flood disaster. During the floods of 2016 and 2017, a total of 10,432 people were affected in Pahang due to this disaster, and the total losses recorded also exceeded RM13 million. Moreover, these losses were not only suffered by the public but also involved government agencies, including the property of JPSD. If I am not mistaken, the total losses involving public property belonging to the Department of Irrigation and Drainage during that flood amounted to RM40 million. Mr Chairman and the Honourable Minister, I request that some attention be given to the application for flood mitigation projects in Maran, where although floods do not occur with water rising across the whole Pahang River, whenever heavy rain falls, flash floods will occur, and they occur every year. That is why we have already submitted an application for an allocation to the ministry totalling RM25 million. Perhaps in stages, with permission, in phases. I also understand that perhaps the Ministry of Economic Affairs has in principle agreed to approve this allocation. I ask for the goodwill of the Honourable Minister for the future of the people in this area, to approve the allocation for this flood mitigation.

Mr Chairman, the second is Item 020300 – Minerals and Geosciences. As was mentioned by several of our colleagues in this House just now, regarding the supply or sale of mineral water that is widespread throughout the country, and these bottled waters sometimes come in various brands. I do not know, which is why I ask for an explanation from the ministry. What are the categories of these waters? What I know, and what most of us know, is that this water can be drunk. When buying at shops the price may differ, whether half a kilo or so on. What we commonly see is that it is identified by the bottle cap. Some have white caps, said to be of low quality. The second is green bottle caps, better than the white ones, and the third is blue caps. These have higher quality. So I ask that the government or ministry inform us, what is actually the difference between these mineral waters being produced and whether they are safe for use, because for suppliers, they have no problem. As long as they can get money from producing this water, they will produce it. I would also like to know how many licences have been issued to companies that produce mineral water and bottled water, because we are worried that if they are not closely monitored, they will abuse this opportunity and only gain profit. In the end the public will get sick or be harmed by this production...

Dato’ Haji Salim SharifUMNO · BNJempolEN

Just a moment, Honourable Maran. I want to add something about the water just now. Just now mineral water, another water that is the most expensive is oxygen water. Is it controlled together with the mineral water that was mentioned and its quality just now? What is the view of the Honourable Maran?

Thank you, Honourable Jempol. I know because when I speak, he usually must be behind me because he wants to appear on TV...

[Dewan ketawa]

I ask the Honourable Minister to include this as well. If possible, there are other waters that have categories...

Dato’ Haji Salim SharifUMNO · BNJempolEN

Eat this, friend.

...So tell all of us. We do not want what was recently viralled saying the water source is from a cemetery. Ha! This, we are not accusing anyone, but we do not want that later, because this company actually did not extract water from that source, but because of the incorrect viral post, the company's name becomes tarnished. Last...

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Honourable Maran, just a little before the final part.

Kubang Kerian, Kubang Kerian.

Ha! Okay, please, Honourable Kubang Kerian.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

A comment in relation to- now, recently, there are too many companies producing these water filters, and the control mechanism for these companies. To what extent are they truly as advertised, or are the people becoming victims of companies that produce water filters that are actually of poor quality but are advertised, and the people are affected by this issue.

Thank you, Honourable Kubang Kerian. I ask the Minister to also include this proposal, and we ask that the government examine how licences are granted, what filtration quality is produced, and whether it is safe for the people to use.

Mr Chairman (Tuan Nga Kor Ming)EN

This falls under the Ministry of Consumer Affairs, not under the Ministry of Natural Resources and Land [Laughter] It's alright, please go ahead.

[Laughter] Because he wants to bring out the water, Mr Chairman. Then last, Mr Chairman, 040000 – Water Development. I request, I think in many Parliamentary constituencies, there are still places facing water supply problems, because firstly the pipes are too old. In Pahang alone, if I am not mistaken, according to information provided by the ministry, roughly 12 thousand kilometres from Pahang to London if we connect the pipes, that is the replacement requirement for piped water in Pahang.

Mr Chairman (Tuan Nga Kor Ming)EN

Honourable Maran, time is very jealous.

I request that the ministry give attention to the water supply in Chenor Seberang, namely in Bukit Kertau, which supplies water along the whole of Chenor Seberang. Second, the water supply in FELDA areas, which frequently occurs, especially FELDA Jengka 7. Thank you, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Maran. Now I invite the Honourable Jeli, followed by the Honourable Kuala Krau.

Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Mr Chairman. I have six matters. First, Item 030000 – Forest Management and Biodiversity. I want to ask about education for the people of Malaysia, school children and the general public so that they love the forest, love the rivers, plant trees. Is this included in this allocation? If not, whether corporations contribute, is the ministry planning to encourage large corporate sectors to contribute to efforts for the people of Malaysia to love rivers and love forests. The second is P.08600 – Peninsular Forest Management. In Jeli, there is a programme by the district office, namely urban forest. This area is small, only 7 acres, after obtaining cooperation from the Forestry Department. I request that cooperation be continued so that it can be made into a recreational area that attracts visitors to this area. Third, P.07100 – PERHILITAN, RM53.6 million. This relates to monkeys, wild boars, elephants, tigers. Alhamdulillah, tigers are no longer a problem in Jeli, previously they were. Elephants are a major issue. The issue is related to staff and allocation. There is a new method in the budget and we say thank you. This is an important problem. In Tanjong Piai too, I am informed there is a threat from monkeys. For example, wild boars are common, and elephants. So this involves damage to rubber plantations, fruit and oil palm. To what extent can this new method reduce conflict between humans and animals, and to what extent can it curb the problems faced by farmers. Fourth, Mr Chairman, RTB – P.16200. The Golok River in Kelantan passes through Jeli, Tanah Merah, Pasir Mas and ultimately Tumpat. So some sections of the riverbank have already been strengthened. So we want to know, we know there is a plan for this RTB. To what extent its progress has reached and whether it will cover certain areas in the four districts mentioned, namely in the four Districts of Jeli, Tanah Merah, Pasir Mas and Tumpat. To what extent is the RM443 million allocation, how much is allocated for the Golok River. In my area, I request consideration for the Lanas River and also the Lakota area that is always flooded. The two rivers cause problems because of the rate of five or six times a year when there is heavy rain. Because the rivers are shallow, whether the allocation under P.15000 for small JPS works can be used to repair these small rivers. Furthermore, regarding NRW which was much discussed by Honourable Members, RM365 million. We want to know for how long, how many years are required to enable the government to address the NRW problem.

Just now the Honourable Arau said Perlis is number one, 63 per cent, Kelantan is also high at nearly 50 per cent, its NRW is high. RM365 million across the whole country, when can this problem be solved? This is the main problem in Sabah, Pahang and elsewhere. For Kelantan, I want to know when the NRW problem can be solved so that the water supply problem can be reduced. So Mr Chairman, that is all. Thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Jeli. Honourable Kuala Krau, please. After that, Honourable Hulu Terengganu.

Thank you, Mr Chairman. I would like to refer to Item 020100 – Department of the Director General of Federal Land and Mines (JKPTG). We know that this land includes land under state governments and also land gazetted under JKPTG. I ask the Honourable Minister to state how large is the land under JKPTG. What development plans will be carried out on those lands, especially for the state of Pahang. Just now while I was making an interjection on the speech of the Honourable Jerantut, I mentioned Malay reserve land. I also ask for an answer from the Honourable Minister so that Malay reserve land can be maintained at the level of 50 per cent. Now only 12 per cent remains. We must refer to Article 89 of the Federal Constitution so that matters concerning this Malay reserve land can be preserved. Next, regarding Item 040100 – Water Management. I ask the Honourable Minister to state how much debt state governments owe to the Federal Government regarding water supply projects. Specifically for Item 22000 – Water Supply Debt for the state of Pahang, which is RM2.2 billion. I believe with the Federal Government's intention to hand over water management to Pengurusan Paip Air Berhad, so that this debt can be written off. Likewise regarding the role of the Pahang State Government in building these public low-cost housing projects. Many among the residents in these houses do not pay water bills. We also hope the Federal Government can consider this matter. Likewise the next matter, regarding the allocation or debt of RM200 million when Pahang, or Youth and Sports, organised SUKMA in 2012, so that the burden of this RM200 million debt can be written off. Likewise regarding the RM40 million expenditure borne by the state government for repair works on water, water pipes and also treatment plants resulting from floods. Next, I want to know the estimated project amount of RM767 million but the actual expenditure in 2018 was only RM6.628 million. Now it was revised in 2019 to RM4.500 million but has been cancelled. So I ask the Honourable Minister to answer, what is the reason this has happened. Thank you, Mr Chairman.

Tuan Sabri bin AzitPAS · PNJeraiEN

Brief interjection, Honourable Jerai.

Mr Chairman (Tuan Nga Kor Ming)EN

That's finished. Yes, Honourable Member, now I invite the Honourable Hulu Terengganu, followed by the Honourable Kemaman. Please.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Thank you, Mr Chairman. I will go straight to what I wish to state in this Committee, namely Supply 23, Item 030200 – Wildlife and National Parks Protection, together with P.07100 – Department of Wildlife and National Parks (PERHILITAN). As many Honourable Members have raised, concerning crop pests, namely monkeys, wild boars, elephants and others.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Since Hulu Terengganu is an agricultural area, these are major pests that are currently plaguing the farmers. So we hope that an action under this ministry will be taken to overcome this problem. What I wish to propose to the ministry is that subsidies be provided for traps for monkeys, as well as macaques and so on, to ease or to eradicate these crop pests, because with these traps, God willing, we are confident this problem can be resolved. Next, Mr Chairman, I move on to Supply 23, Item 16700 – Flood Mitigation and Urban Drainage Programme, together with Item 020400 – Irrigation and Drainage.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

What I am raising here is that in Hulu Terengganu there is a retention pond located at Kampung Paya Besar Kuala Berang, which has been in existence for more than five years and requires maintenance and repairs. It is hoped that the ministry can provide a sufficient budget to overcome the problem or to resolve the condition of this long-standing retention pond, because it is very important for the surrounding community in overcoming flood problems. Before this retention pond was built, flooding here would last for a week as water stagnated, but with this pond, it can reduce the duration of flooding in the area. Then, another quite critical issue is the restoration of the Sungai Telemong riverbank at Kampung Tok Imam Lapar, where the riverbank has eroded, which eventually may cause the bridge connecting this village to be cut off, and this is very worrying because the bridge is used by many residents, especially schoolchildren and workers. So, it is hoped that sufficient allocation will be given the proper attention to ensure this bridge does not collapse or that the river does not erode, and that this can be resolved. Then, another at Taman Jaya, Kuala Berang, namely riverbank erosion that is very critical, where I have seen what has happened: much of the land there has washed away, and in the end the landowners only have the land titles left. The land is no longer there. So this also requires a process or project to ensure this riverbank does not erode. Then, finally, Development 23, Item 25000 – Terengganu Water Supply Programme, for which only RM900 thousand has been allocated for this year, although there is an increase. However, what I would like to request here is: what projects has the ministry planned for the Water Supply Programme for the State of Terengganu? That is all, Mr Chairman, thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Hulu Terengganu. Now I invite the Honourable Member for Kemaman. After that, the Honourable Member for Beaufort.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Peace be upon you, the mercy and blessings of God, and greetings of peace. Firstly, I extend a thousand thanks to Mr Chairman for giving me the opportunity to join in the debate at the Committee stage of the Ministry of Water, Land and Natural Resources. Firstly, I would like to touch on Item 15000 – Minor Works of the Department of Irrigation and Drainage (JPS) Various States and 15300 – River Mouth Dredging. I would like to voice the aspiration or issue in my Parliamentary constituency of Kemaman, namely the Kemaman River, which is becoming increasingly shallow, making it difficult for fishing boat activities to catch fish and for government agency vessels to carry out their duties. Therefore, I request the attention of the Minister and the ministry to deepen the course of the Kemaman River, since the river is the main route in and out for fishing boats and also government agency vessels.

Tuan Che Alias bin HamidPAS · PNKemamanEN

Next, Item 16700 – Flood Tambatan Plan (RTB) and Urban Drainage. Firstly, I would like to bring up the issue relating to the flood tambatan project in the Parliamentary constituency of Kemaman, in the Kemaman area, which I have previously mentioned in this Parliament. Therefore, I would like to know the latest status of the development progress of the integrated river basin flood tambatan project in Kemaman, and when this project is expected to be completed? Secondly, with regard to the allocation received under the Flood Tambatan Plan, which is RM443.9 million. I would also like to know the latest plans and projects implemented in the State of Terengganu, particularly across all areas of the State of Terengganu, given the flood situation that always occurs towards the end of every year. Next, Mr Chairman, I refer to Item 030000 – Forest and Biodiversity Management and Item 030100 – Peninsular Malaysia Forestry. Every year, the tropical rainforests of our country are destroyed due to rampant logging activities and unsustainable development, which causes threats to humans and the environment. I have great hope that with the allocation received for forest and biodiversity management, encroachment into gazetted and protected forests can be addressed comprehensively without compromise. I would like to know to what extent the government, together with the cooperation of state governments, is committed to ensuring that the forest areas of our country continue to be protected and maintained with 50 per cent forest cover. I understand that the Honourable Minister will issue a guideline concerning the jurisdiction of state governments in managing uncontrolled logging activities and the extraction of forest produce in each respective state. Therefore, to what extent has the guideline that has been issued achieved more sustainable and more enduring forest management? Mr Chairman, I refer to Item 08600 – Sustainable Forest Management. I understand that the Forestry Department of Peninsular Malaysia (JPSM) has targeted five million hectares as permanent forest reserve in Peninsular Malaysia by 2020. Therefore, I would like to know what initiatives and what programmes are being implemented in an effort to achieve that target? Next, with reference to Item 030200 – Wildlife and National Parks Protection. I seek an explanation from the Minister on the strict action taken against those, whether local or foreign citizens, who are involved in illegal hunting and also the smuggling of wild animals, which is increasingly worrying to us. We see wildlife populations increasingly threatened, especially endangered species, notably the Malayan tiger and the Borneo pygmy elephant, which face extremely severe conflict and threats from inhumane humans. I would like to know, according to research, how many of these animal species there are in our country's forests to date? Next, Item 070100 – PERHILITAN, where the allocation received is seen to have decreased, namely by RM6.1 million, whereas the function of PERHILITAN plays a major role in protecting and preserving protected areas from extinction. Therefore, I would like to know the programmes and activities for managing protected areas, and at the same time strengthening the function of PERHILITAN in line with the national biodiversity policy that exists. Finally, I would like to touch on Item 2500 – Terengganu State Water Supply Programme. I see that the water supply allocation for the State of Terengganu has been cut by up to RM300 thousand. Accordingly, I seek an explanation from the Honourable Minister as to why the allocation that should have been given to Terengganu has been cut. That is all, thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Kemaman. Now I invite the Honourable Member for Beaufort. After that, the Honourable Member for Masjid Tanah and the Honourable Member for Batu Kawan. Please.

Thank you, Mr Chairman. I will go straight to Item 28000 – Sabah State Water Supply Programme. I would like to ask the ministry whether it has monitored the new Beaufort treatment plant, which, up until now, still causes problems for the people in my area. It has become a grievance and anger of the people towards the government because water sometimes is available and sometimes is not, and it is said that this plant cannot supply water to our pipes throughout the whole Beaufort District. Therefore, I ask the ministry to look at this matter seriously because this is a serious problem for the people within the Beaufort Parliamentary constituency. Likewise with the Limbawang plant, which supplies water to the Kuala Penyu District, which is also within the Beaufort Parliamentary constituency, is problematic from time to time; sometimes there is no water supply in the Kuala Penyu District for days, in the Menumbok Small District. So, I ask the ministry also to monitor whether there is a need to further upgrade this plant, and please help provide an allocation so that the problems of the people can be resolved as well as possible, and once and for all, as the English say, with permission.

I would also like to refer to Item 15000 – Minor Works of JPS, which I see has been reduced, with only RM100,000 allocated. I feel this will affect the programmes for cleaning rivers and drains, which often cause problems for the people. Sudden floods occur because of rain and so on, because these drains are already dirty and filled with grass, and require regular cleaning. So if the allocation has already been reduced, this will cause problems for the Klias River, the Tangulian River and other rivers and drains within the Beaufort Parliamentary constituency. So, I request that the ministry look at this again. Item 15100 – Coastal Erosion Prevention. I also ask that a comprehensive study be carried out on the beaches in our country, Malaysia, including in my own area. Among the beaches involved are Pantai Mempakul, Pantai Menumpang, Pantai Tinambak, Linsuk and Selikuh, as well as Mansud within the Beaufort Parliamentary constituency, which are now experiencing coastal erosion. It is not only the loss of economic livelihood but also their homes, which are now in a state that I feel is worrying, and there will be no place for them to live if this erosion gets worse. Therefore, I ask that the ministry look at, study and help us to resolve this problem, perhaps by building embankments and so on so that this erosion does not get worse. I also want to refer lastly to Item 02801 – International Boundary Marking, Measurement and Maintenance Project. I would like to ask whether the Department of Survey and Mapping Malaysia (JUPEM) has come to Tanjung Klias in Menumbok, which I understand is the westernmost location in Malaysia. Has mapping been done? If so, because we want to develop this area as another tourist attraction in the Beaufort Parliamentary constituency. I really hope that JUPEM can carry out this mapping. Thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Beaufort. The Honourable Member for Masjid Tanah.

Thank you, Mr Chairman. I wish to mention four items.

The first item under Item 15100, namely Coastal Erosion Prevention, and I would like to extend a thousand thanks to the state government for having provided urgent allocations for coastal erosion at Kampung KK Kuala Sungai Baru, Pengkalan Balak and also Kampung Tanjung Dahan recently. However, I would like to give a pantun for the Honourable Minister:

Pergi berkempen di DUN Kukup; Kerajaan negeri bagi, tapi tidak cukup.

Went campaigning in the Kukup State Legislative Assembly seat (DUN); The state government gave, but it was not enough.

Therefore I request the attention of the Honourable Minister to provide an allocation from the Federal government to help prevent this coastal erosion, in which Kampung Balik Batu, Teluk Gong, Kampung Tengah have not been included. I really hope because they want to build coastal protection structures which may threaten residents of Masjid Tanah who live close to the beach. I really hope that the Honourable Minister can consider this allocation to look at and zoom back in specifically. Next, I would like to move on to Item P.16700 – Flood Mitigation Plan. JPS Melaka has applied for RM30 million for a flood mitigation project in Masjid Tanah to address the Masjid Tanah Ria area, which today they already call not Masjid Tanah Ria but 'Masjid Tanah Duka'. Because every year, three or four times, there is flooding, and this is also to address the sewerage problem that has existed for a long time and cannot accommodate the increasingly large volume of water due to the many developments within the Lendu state legislative assembly (DUN) area. So, we need it urgently because there is an allocation that has come down in the Alor Gajah District, reportedly RM30 million, but that is in the Alor Gajah Parliamentary constituency, not Masjid Tanah. So, I really hope that it can also be considered for the Flood Mitigation Plan in the Masjid Tanah Parliamentary constituency, because otherwise, every time a flood occurs, the clean-up costs that we need will also be very high. Next, I would like to touch on Item 15300 – River Mouth Dredging. I also hope that the construction of the embankment in the rivers, namely at the river mouth of Kuala Sungai Baru, can be expedited. Otherwise, sand will hinder the fishing boats from going out to sea. This is because if they want to go out to sea they have to wait, they have to go down early first and place the boats in the middle of the sea, only then can they get into the river and to the beach, because otherwise it will be difficult when the water is shallow. The same goes for sand-dredging activities. I really hope that the ministry will look into how these activities have already affected the river mouth, making it shallow and causing sediment in the water to rise and mud from the upper river to increasingly move towards the middle. So, I hope it can look at and also give attention to this matter because when sand-dredging activities occur, the things I have mentioned happen and ultimately cause the yield from the river to decrease. Next, I would like to mention Item 030000 – Forest Management and also Biodiversity. Sub-items 030100 and also 030200, and I would like to ask about the increase in allocation that has occurred. Does this mean an increase in funds given to agencies to strengthen enforcement to control illegal hunting activities? As was mentioned by the Honourable Members' colleagues earlier, they spoke about the Malayan tiger, which has become extinct, and likewise the Kertam, namely the Sumatran rhinoceros, which has already passed away due to illegal hunting and also other matters that have occurred. I would like to ask whether we are giving to the wildlife authorities and also the NGOs involved and also the enforcement agencies so that they can together tackle and help with illegal hunting and so on, because they face various challenges. So I would like to ask what about public awareness campaigns on this problem and for Malaysian society to also together appreciate conservation and its preservation. Next, I would like to draw the attention of the Honourable Minister to a problem that occurs near Masjid Tanah. Like other friends, we not only have the problem of monkeys, macaques, but we also face the problem of 'beliau'.

There are too many 'beliau' near Masjid Tanah destroying crops. There are too many wild boars destroying crops, the fences of villagers, all belongings, entering houses and so on. That is how they ask for help from RELA (People's Volunteer Corps), but then they get shot at in an inhumane manner. So, how do we overcome this problem? So I really hope, because in Melaka too there are a great many complaints. A total of 716 complaints, these are the ones that complained, those that did not complain we do not know, and 253 complaints came from the Alor Gajah District. Lastly, I would like to ask, I want to take response from the ministry regarding the state government's proposal, regarding the long-term plan to gazette part of the 4,000 hectares of water catchment area that was previously plantation land, oil palm and so on, to be made into a permanent forest as a new habitat for these animals. Can it be realised? Thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Masjid Tanah. The Honourable Member for Batu Kawan, after that the Honourable Member for Putatan.

Puan Kasthuriraani A/P PattoDAP · PHBatu KawanEN

Thank you, Mr Chairman, for the opportunity for Batu Kawan to debate this Ministry of Water, Land and Natural Resources (KATS). I will begin with Item 040100 – Water Management. I would like to know here, what is the ministry's plan to provide a storm catchment area, with permission, in the SPS and SPT Districts, given that the Batu Kawan Parliamentary constituency has two districts, namely in Perai, Bukit Tengah or in Bukit Tambun. Following under the same item, my question is when the project for deepening and dredging the Sungai Junjung Mati in the SPT District, and the bank stabilisation works for Sungai Junjung in Permatang Tinggi, will be carried out by the ministry. When also will the works to upgrade the siphon at Kampung Bukit Kecil Juru, as well as the works to upgrade the channel of Sungai Junjung Mati beside the Rex factory, all in the SPT District, be carried out by the ministry. As this is based on the state Drainage and Irrigation Department (JPS) report, but I would like to know what timeframe is required by the JPS under the Honourable Member's ministry to implement these projects. Second, is Item 14500 – Upgrading of Urban Drainage and Flood Mitigation Infrastructure. Mr Chairman, I would also like to ask about the projects to upgrade the rivers that pass through the Perai State Constituency, the Bukit Tengah State Constituency and the Bukit Tambun State Constituency. For example, the Perai and Sungai Juru and Sungai Junjung rivers that pass through Kampung Main Road, Chang Yin Fatt, Taman Emas, Kampung Nanas, Kampung Dop, Kampung Jawa, Kampung Tok Panjang, Kampung Kebun Sirih, Juru Estet, Taman Mangga and Taman Pinang, Kampung Tersusun, Taman Sentul, Taman Sentul Jaya, Kampung Sekolah, Taman Merak, Ladang Valdor, Kampung Baru and Sungai Bakap.

Puan Kasthuriraani A/P PattoDAP · PHBatu KawanEN

How many projects have been applied for by the Penang JPS (Drainage and Irrigation Department) for river deepening and upgrading works and flood mitigation in the Bukit Tambun State Constituency for the year 2020, and also in the Bukit Tengah and Prai State Constituencies? I would like to know this, given that several areas in the Batu Kawan Parliamentary constituency are below sea level, so that when there is heavy rain for a short period, those areas will flood quickly. Next, I refer to Item 08601 – Planting of Mangroves and Suitable Species on the Coastal Shoreline. I would like to know how many areas in the state of Penang have been earmarked for mangrove planting projects and suitable species, and whether Batu Kawan is included in this plan? If not, I request that Batu Kawan be included together with Pulau Aman. I refer to Item 07100 – PERHILITAN. Together with the other Honourable Members, the Batu Kawan area is also not spared from threats from our other friends, wild boars in the Pulau Aman and Kampung Baru areas, and also monkeys in Batu Kawan.

Puan Kasthuriraani A/P PattoDAP · PHBatu KawanEN

At the same time, I would like to know PERHILITAN's plan to visit the Sungai Prai to conduct a survey of the bird and fish species found there, given that the area is close to industrial areas. There are several factories that release their waste materials into the Sungai Prai, which, according to what the elderly people there say, has caused many species of crabs, fish and other creatures that once existed but today no longer exist or are considered extinct. So, I would like to know whether PERHILITAN will come, if so, with permission, I will be very happy to host a visit by PERHILITAN. Mr Chairman, I would like to state in this august House our appreciation to the JPS and all the NADMA (National Disaster Management Agency) teams for the floods that struck Penang a few weeks ago, and in particular I would like to highlight here a problem with the Indah Water Treatment Plant in Taman Sejati. A site visit by SPAN (National Water Services Commission), led by the Honourable Charles together with his team, as well as with the Penang State Government Executive Councillors, the Honourable Zairil and the Honourable Phee Boon Poh, together with the local State Assemblymen, has examined the issue of waste materials from the commercial site next to the residential area of Taman Sejati. The problem is that the Indah Water sewage treatment plant is shared by the residential area and the commercial area. This project was approved during the previous government and unfortunately had to be implemented as the budget had been allocated, the project has gone ahead, but today we have to tackle the problems resulting from the decisions made by the previous government. However, I would like to express my thanks for the commitment of the agencies under the Honourable Member's ministry, especially SPAN and also JPS, because a decision or a solution has been reached; if successful in that area, this pilot project, then I hope the ministry can adapt this approach. Work hand in hand with KPKT (Ministry of Housing and Local Government) to ensure that local authorities (PBT) use these guidelines if commercial areas share a sewage treatment plant or an Indah Water Treatment Plant with residential areas. With this, I conclude, thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Batu Kawan. Please, the Honourable Member for Putatan.

Thank you, Mr Chairman. I have only one. I will go straight to Item 15300 – Dredging of River Mouths. There is a fish landing centre at Pasir Putih in my constituency, P.173 Putatan. There are indeed 300 registered fishermen in this area who use the fish landing centre located here. The problem is that when the water recedes, the fishermen's boats are stranded one kilometre away from this fish landing centre, causing the fishermen to have to carry their fish catch that far. The solution is that the mouth of this small river needs to be deepened and breakwaters built on the left and right so that the deepened river mouth can last for several months. For the information of the Drainage and Irrigation Department, this area is indeed served. However, when it is deepened today, it can only last for a certain period, sometimes only one month, because it will be closed again by the sand carried by the waves. Therefore, the breakwaters on the left and right are necessary. That is all. I request that the ministry approve my application to deepen the river mouth and build these breakwaters. It is only a small river mouth for the convenience of fishermen in landing their fish catch. Thank you, that is all.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you. Very well, Honourable Members. A total of 40 Honourable Members have taken part in the Committee Stage debate under the Ministry of Water, Land and Natural Resources. Now I invite the Honourable Minister to reply. The time allocated, I understand the Honourable Minister has an engagement overseas. How many minutes? 45 minutes?

Dato’ Dr. Xavier JayakumarPKR · PHMinister of Water, Land and Natural Resources · Kuala LangatEN

More than one hour.

Mr Chairman (Tuan Nga Kor Ming)EN

One hour, yes, for those who do not have time, written replies may be provided. Please, Honourable Member.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Thank you, Mr Chairman. First, allow me to record my highest thanks to the government which has approved a total of RM4.776 billion for the Ministry of Water, Land and Natural Resources. This total covers an operating expenditure allocation of RM1.276 billion and a development allocation of RM3.5 billion. The development and operating budgets of the ministry for 2020 have increased by 23.72 per cent and 8.5 per cent respectively compared with 2019. This shows the commitment and earnestness of the new Malaysian government administration in managing issues related to the nation's water, land and natural resources. For the information of this august House, the ministry also records its thanks for the concern of the 40 Honourable Members who have debated issues under the Ministry of Water, Land and Natural Resources throughout the debate on the Supply Bill 2020. Before I begin answering the issues raised, allow me to express my thanks and highest appreciation to the Ministry of Finance, especially to the Honourable Minister of Finance, who during the 2020 Budget speech provided an additional allocation under the Ministry of Finance for the purpose of achieving the objectives and strategies of this ministry. Among them is RM48 million to conserve the integrity of forests and natural biodiversity, namely matching grants, and to support the Central Forest Spine and Heart of Borneo initiatives, and also RM15 million for the Malaysian Conservation Alliance for Tigers (MYCAT), the Sepilok Orang Utan Conservation Centre and also other NGOs. RM20 million to appoint rangers from among retired soldiers and the local Orang Asli community. This is to ensure that the integrity of the forests and natural biodiversity are preserved as the heritage of the nation's future generations. The ministry has held discussions with the Ministry of Finance so that the allocation is channelled to this ministry, and to ensure that the allocation channelled to NGOs achieves the set objectives. The ministry will also establish terms of reference, with permission, in term of reference, control mechanisms and other necessary matters to ensure this allocation is used as intended by the government. Mr Chairman, I will compile several questions and queries that have been raised by the Honourable Member on the issues of water, floods, river mouths and also what is said to be coastal erosion and so on. I will summarise all of these in one reply, Mr Chairman. On the issue of water, I would like to tell all Honourable Members that we have long-term plans and short-term plans regarding the water issue in our country.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

However, this water issue is not uniform across all states. Some states have sufficient water resources, namely raw water, but there are also states that will be stressed in the coming year, within two years and so on. However, what we know, Honourable Members, is that if we do not take action now, if we do not do something now, within 10 years from now, we will face a major water problem in our country. Therefore, the ministry has made an overall plan in which we focus on each state according to its capacity so that we can implement their respective programmes, from Perlis to Johor, Sabah and Sarawak. The major problem in our country is Non-Revenue Water (NRW). The average I know of in the country is nearly 35 per cent. However, some states mostly exceed 40 per cent. The highest is the state of Perlis with 67 per cent NRW. That means that if 100 MLD leaves the water treatment plant, 67 per cent is lost in the ground. Our losses are huge.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Therefore, the ministry will give priority to reducing NRW overall. We have our plan, and now the ministry is in the process of tendering several packages in all states, including Perlis, Perak, Pahang, Kelantan, Sabah, Sarawak and other states, for us to tackle this problem. I have made an assumption...

Honourable Minister, may I? Yes. Mr Chairman, I would like to ask the Honourable Minister whether this is aid or a loan for us to reduce this NRW rate.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

For this NRW, it is not a loan, it is a grant from the government. So, we have, and now we want to change meters, we will replace pipes in certain areas. However, all this we must obtain cooperation from each state. Each state has private water companies and they must cooperate. The state of Kelantan, Johor and Penang have come to meet me. So, I will now work with the state of Pahang, which has met me many times. Not only the Honourable Members who are here, but the Right Honourable Menteri Besar has met me many times regarding the water issue in the state of Pahang. We have a long-term plan (long term) in the state of Pahang. However, Pahang also has problems in the water industry and its water company. We must understand and we must acknowledge that there are problems, and we must overcome these problems as quickly as possible in the future. However, for the respective states, I would like to say this. The water industry requires very high capex, very high capex for us to rehabilitate, upgrade and also build new water treatment plants and water systems in each state.

Tuan Sabri bin AzitPAS · PNJeraiEN

Honourable Minister.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

However, the problem is...

Tuan Sabri bin AzitPAS · PNJerai

Jerai, Jerai.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Let me finish first. However, the problem is that, because there are insufficient funds from the respective states, and the water companies in the respective states do not have unforeseen allocations to lay pipes for NRW or to build new ones and so on. They depend on the centre for us to help them overcome this problem. However, that is why we in the ministry have already started the process where this TSM – I think we must understand the TSM issue, the water tariffs we have now. This capex is large now, what we spend now is expenditure at the present time, but these tariffs we have were set 20 years ago. How will the water companies in the respective states use the current tariffs for their development or to upgrade the existing systems in each state? Therefore, through my ministry, I have started these discussions with the tariff setting mechanism so that we reach an understanding that it is now time for us to raise water tariffs in the country and for all states to go along together. Because, if there is no increase in water tariffs in each state, we cannot upgrade the water systems in our country. Some states do not have raw water and must buy from other states. For example now, Selangor buys water from Pahang, the problem is solved, the problem is solved. However, now we want to see whether there is another water project from Perak that will be sold or will be shared with Perak and Penang to upgrade water in the water system in the respective states. The state of Johor, if we do not do something within the next two years, there will be major stressed water because there is insufficient raw water in the state of Johor. This is a major problem that we face. The state of Kelantan, there are several areas with insufficient water. The Kelantan State Executive Councillor came to meet me and we agreed to reach a little understanding where we will build water treatment plants called mini-LRA in the state of Kelantan to increase the water supply in the state of Kelantan. However, the problem in the state of Kelantan is that it only uses underground water, it does not use water from rivers. So, that is why we must have a hybrid project where we use river water and at the same time, we will also use underground water.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Therefore, in the immediate term under this RMK-12, we will start to use underground water in several states as well. For example, in the state of Johor it must be done. In the state of Kedah, it must use underground water, Pahang need not, because there is surface water. Perak need not because there is surface water, but Selangor we must do it. In Kelantan we must adopt the hybrid approach, underground water and river water must be used to overcome the problem. In Kelantan recently we have approved the construction of a dam in Gua Musang...

Sibu, Sibu here.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Honourable Minister, may I ask a little?

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

North of Gua Musang. Yes.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Thank you, Honourable Minister. I would like to ask, although a solution from the hybrid angle has just been made, the most important thing is the very old pipes that are already dilapidated in Kelantan. So, when is the timeframe set by the Honourable Minister's ministry to resolve the pipe issue?

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

We have started, now we are in the tender process. There are two packages or three packages in Kelantan where we have started to replace pipes, replace meters and so on in the areas. However, this cannot be resolved within one or two years. If we have a target where we want to reduce NRW from 31 per cent to 25 per cent, this will take more than five years for us to do. Remember, Honourable Member, if we want to reduce NRW by just one per cent across the whole country, we have to spend almost RM1 billion to reduce NRW by one per cent. This is the only major burden on the government to make high capex with the raw water we have.

Sibu here, Sibu here. May I ask the Honourable Minister about the water supply plant or water pump from Sibu to supply raw water to Tanjong Manis - SCORE. Is this project– is its funding from the Federal Government or from the state government? How is a project like this monitored, because now the project is facing problems. This is because initially it used underground water, but that was not successful, not successful because the underground water is too dirty to be processed and contains ammonia.

If the water has no ammonia, it cannot be processed to become water for drinking. So, what is the status of this project now? I ask for an explanation from the Honourable Minister.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I will not be able to answer specifically on that project, but I will give some information on the issue of underground water.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang Kerian

Tuan Pengerusi.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Before we take water from underground, we must carry out a comprehensive study of the whole area: how much volume we have, what reserves we have underground. We must know first before we take water from underground and which areas have underground water. This must be studied first. After that, when we take water from underground, we must know how much we need to take. Because, for the issue of underground water, we must have recharge. Without recharge to underground water, we cannot simply take sufficient water from any place we choose. That is causing problems in areas such as Jakarta or California now, where there is sinking of the plate because much water has already been taken from underground. So, there is now a system adopted by countries such as Denmark and Holland, where we carry out a study first.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

That is why the government has now carried out a study for the state of Johor and the state of Kedah, where we will map the whole state: how the underground water is, what its volume is, where it is located. We will use the expertise of Japan with this 4D survey to obtain the complete picture. Only after that will we take water from underground.

As far as I understand, there are only two projects like this to bring underground water, but both projects were not successful. One in Sibu, at Sungai Sadit.

Dato’ Dr. Xavier JayakumarPKR · PHKuala Langat

Let me check about Sibu and I will get back to you in specific term, okay?

The Honourable Minister.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

I want– at the end of the earlier answer, I would like to get reconfirmation on the construction of a water reservoir in Upper Kelantan or in Gua Musang at Sungai Lebir or so on. I am not very clear. I ask for an explanation on the earlier issue. It was said it is already in the project.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Yes, it has been approved by the Cabinet recently for a project in the north of Gua Musang at Neggiri, if I am not mistaken, that is its name. The dam has already been approved, but I understand that it is not only for generating electricity of up to 300 megawatts, but it must also be carried out as flood mitigation in that area. So, this is a big project that will take some time for us to implement, but it has already been approved.

Tuan Sabri bin AzitPAS · PNJeraiEN

Honourable Minister, with regard to the water supply in the state of Kedah, the five water plants in Kedah that are to be built and upgraded, to what extent has the implementation of those projects been carried out?

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Those projects have now been tendered by SADA for implementation. That is with a rate of– there is a loan, but for the long term, we will settle it by giving grants if they start with the construction first. In Langkawi too, we have ensured that the project implemented in Langkawi uses a hybrid of underground water and river water. This will be used in Langkawi. So, this is the situation in our country. Therefore, I hope the Honourable Members will agree with me and support the position in the ministry, where the tariff setting mechanism for this water price, we must look at it from the angle of building new projects in the states and we want to give assistance to water companies in the states to do so. I can promise the Honourable Members, in accordance with the rules and what we have discussed, and what we have prepared, that SPAN will oversee these water companies, where we will regulate their profit. This water system is not for profit. This is something we must do for the people. So, we must regulate the profit in these companies. So, regardless of whoever the companies are that want to come to start this industry, they must follow the rules that we have set. The priority that we mentioned is that we will standardise the profits in these companies, and we will scrutinise the salaries of the CEOs or directors of these companies, how they are, and we will monitor because these companies carry out their duties in a fair system and also a lean and clean company that we will have in each state.

The Honourable Minister.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

However, at the same time...

Just a little on water tariffs. I actually sympathise when the Honourable Minister says that we need to increase water tariffs, but I think when we say we want to raise water tariffs, it will invite perception or anger from the people, I think, because it has never been increased.

However, what mechanism does the government intend to bring so that the people truly understand? For example, let us look at the latest revision: for the state of Pahang, I think it was 1983; for Perlis, 1996; and for Terengganu, 1997. That means it has indeed been a long time. However, domestic water use for households is around RM14 to RM17. It is very different compared with buying a pack of cigarettes. I think it is more expensive per day, yes. And also, we buy coffee at popular cafés. So, that is what I want to ask: what is this mechanism? So that we here too, when we have a new policy or want to raise water tariffs, it can be accepted openly by all parties. Thank you.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

A little addition, Honourable Minister. What I propose is that, if possible, we should not waste water before raising water tariffs. At present, we waste a lot of water in areas where pipes burst here and there. So, if we raise the price again, the people will be angry. So, if possible, let us solve this problem first and then raise the water tariff. Otherwise, it will become a burden on the people. That is all my view.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

That is the view of the Honourable Padang Serai. However, overall, I think we must understand what standard this water industry is at. If we want to upgrade it, we want to make it better, and we want to ensure that there is water in the pipes 24 hours a day and 365 days a year, we must spend money. This water we must pay for. If your handphone runs out of credit, you can immediately pay RM25, you can pay RM30, no problem, but when I say we want to raise the water price by 30 sen, 20 sen for the first band, which we say is the maximum you will pay for one family of four people using this water, is RM15, RM20 a month.

Tuan Karupaiya A/L MutusamiPKR · PHPadang SeraiEN

No, Honourable Minister.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

That is why I say that SPAN will monitor the companies concerned. The problem here is the perception that people have now: leaks here, leaks there, water cut for three days and so on. I understand. This issue has existed for a long time. We are inheriting the old system we have, but to overcome this problem, we must start with a new, clean slate. I ask all Honourable Members to tell the residents in their constituencies this. If we do not spend, if we do not make improvements– it is not that we do not repair the leaking pipes and NRW. We are focusing on NRW at the same time. However, if the water companies in their respective states can set aside their allocation by five percent or six percent of what they collect and use in their respective areas over a period of 10 years, this problem can be solved.

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

Thank you for the explanation. From my experience as a corporate person, what the Honourable Minister says is indeed correct, if I were a corporate person.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

What kind of corporate person are you, Honourable Member?

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

However, now I am a politician, so I need to think beyond profit, where there is social responsibility. I want to focus my question, Honourable Minister, on the state of Johor. Its water tariff is among the highest in Malaysia.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Did I say Johor will raise the water tariff?

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

May I take this as meaning it will not be increased? Thank you.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Did I say no? So, do not be afraid of Johor, lah. Oh! This means I take it the way Indians say, when someone is silent it means they agree... [Speaks in Tamil] With permission.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

That is what the Honourable Member said.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

I take it that way. Thank you... [House laughs]

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

...That is why I have made a decision in the ministry, because we look at the WASIA Act now. The WASIA Act was established in 2000, it has been nearly more than 20 years since the WASIA Act existed. The WASIA Act is good, we established the WASIA Act because we want to have a check and balance on the water companies in the states. Now, after more than 20 years, we see that the issue in the states is expenditure, there is not enough funding to be spent in the water industry in the water companies. Therefore, I want to return to the WASIA Act, where we will look at how we can help the states below without increasing their debts to the companies as PAB or their debts. The problem in the state water companies is that when their debts rise, the repayment from the company to PAB and so on is high. Therefore, we always have to raise the water tariff for them to balance with the existing business plan. If that business plan cannot be applied, we must adopt a higher water tariff mechanism or we must spend more and give liabilities to the state water companies. Therefore, we must find a new way, namely where we say that the private companies concerned can enter into this matter- this is only a proposal, now we will study it carefully, in depth. Where they will come, we will– like SPAN will determine that those who come, we regulate their profit margin, a small one- it does not put a burden on the state water company but it sells water to the state water company at a rate determined by the ministry and SPAN. In this way they have no burden to repay large debts, and we ensure the water industry is sufficient in every state. So, that is my answer for the state, on water, because I have other matters that I want to include.

Mr Chairman, may I, Chairman, may the Minister? I touched on the state of Pahang, the debt and the burden...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Yes, we have settled the rural areas. We have settled the rural area debts.

Including the debt during SUKMA...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

You must ask the Minister of Finance. That is not my problem. You ask the Minister of Finance.

Ustaz Haji Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

What about Kelantan, Minister?

A little on the water issue, Minister. We understand the Honourable Minister's concern is the cost that has to be given to water operators. However, what worries our people, including the Honourable Segamat, the Honourable Padang Serai and also me, is the percentage increase from the current price. If it is now about 52 sen, and the Philippines is RM2, and I understand Singapore is RM4 for every first 1,000 litres. So, what is the estimated percentage that the government will set for this water price, so that the public and also the people's representatives do not get headaches explaining it to the people, and so that we can help this Minister. Whether it rises above RM4, or RM2, RM3 and so on. Thank you, Honourable Minister.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I can give the Honourable Member an assurance. When we carry out a study, we have three bands, where we say first band, second band and third band. If you are under the third band and you use far too much water in the house, the price is certainly higher than band one. However, 60 percent of consumers are in the first band. The increase in the first band is very low, I can say very low, because it is not the whole. There is band one, two and three. It depends on consumers in each household, how much water is used. Do not wash the car every day, lah, no need. That will determine that the reasonable water price we will give.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

The issue of floods– many Honourable Members have raised the issue of floods in their respective areas. This issue of floods– I received an answer from my officers. The average increase in tariffs under the tariff setting mechanism (TSM) is between 7 sen and 71 sen per 1,000 litres.

Tuan Pengerusi,

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I want to go into floods...

Just one question. Mr Chairman, if electricity bills are exempted for applicants or those listed under eKasih. When this water supply tariff is increased, is it also taken into account that eKasih recipients, the eKasih group, will be exempted from paying the bill? Perhaps water bills at the rate of RM20 and below need not be paid by those on the eKasih list.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Honourable Member, that depends on the state water company. We do not make that decision. The ministry will not make that decision. That decision is under the state, the state's responsibility. Can the state bear for– say these B40 households registered under eKasih, they need not pay for 20 cubic millimetres of water, no need to pay. That depends on each state's budget. We will not interfere in that issue. The issue of floods. This issue of floods is now increasing. It is increasing because we have phenomena such as climate change and so on. This climate change is truly in front of us, we cannot run away from it. So, I ask all Honourable Members here. We must hold programmes in our respective areas on the issue of climate change, because these floods will always occur. I cannot promise here that when there is flooding, we can lower certain areas. The problem with floods is that it occurs in certain areas, other areas and other regions. The rain that falls is sometimes extremely heavy in those areas. So, that is why I think we, as people's representatives, must understand the issue of climate change and we must carry out education in the schools in our respective areas. Because these floods are related to coastal erosion. These floods are also related to river mouths and the ways we often request to dredge river mouths and so on. Once we clean out one river mouth, we spend RM100 thousand to RM500 thousand. I can ensure the Honourable Members that after six months, it is back to the situation as before. This is the situation for the river mouths we have. Two matters. One, the big waves that pull sand into the river mouths. Number two, each state must hold a meeting with the Menteri Besar and the Exco in the states on the use of forests in their respective states. The current situation is that if we go to any river in our state, the colour of the river shows that we have large sedimentation in those rivers. These big rivers are not the colour they used to be. Why? Because there is major erosion upstream. Earlier, a Honourable Member asked me about the SOP that I have prepared by JPSM, the Department of Irrigation and Drainage Malaysia (JPSM), for us to release areas where logging and so on can take place. That SOP exists. Will states follow that SOP? That is up to each state. I cannot tie that SOP to the situation below, where they will certainly follow the SOP. There is none. The Honourable Member understands, this land issue is a state issue. If the Honourable Member agrees for me to make changes to the Akta Tanah Negara, that is a constitutional reform. Agree or not agree?

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

If we agree, we in the Ministry and also the Government will have more power to determine how these forests we have are conserved and preserved forever. If the Honourable Members agree in Parliament, we can take it, but I must obtain the support of Tuanku in the respective states. So, this is not going to happen. So, let's not go there. But I remind the Honourable Members that you are accountable to the residents in your constituencies.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Hold dialogue with the Menteri Besar and Exco of your respective states to ensure that the forests in your respective states are protected and do not open excessively large areas for logging and so on. It has to stop. This is important for us...

A little, Honourable Minister. I am moved when the Honourable Minister wants that power. In my view, if it does not become a problem, there is no problem. Only, in terms of comparing rivers, I agree. Large rivers like those in the state of Pahang, one of the sources of pollution is logging areas. But how can the Ministry's existing powers be enhanced in terms of monitoring and enforcement of rivers, which are indeed within the Ministry's jurisdiction? For example, Sungai Kim Kim in Johor, whose source of pollution to the river is— perhaps with the powers the Ministry has, it could help. Yet Sungai Kim Kim has no logging area at all. So, what is the Honourable Minister's answer apart from...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Sungai Kim Kim is under MESTECC, not under the Ministry of Water, Land and Natural Resources. It is under the DOE. I do not have the power...

I understand, Honourable Member.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I do not have the power.

I understand, but what I mean is, if possible, we should pool river management powers. Pollution in rivers must be under this Ministry's jurisdiction because this is where the rivers are. Other pollution may be under MESTECC's powers.

Dato’ Dr. Xavier JayakumarPKR · PHKuala Langat

Yang Berhormat.

...Relating to water.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Wait, wait. Honourable Member, that too would require amending the Act, okay. Rivers are also under the states and not under the Federation. All rivers are under the states. Many powers are under the states. Honourable Members, I request that we hold a meeting with the Menteri Besar and Exco. Bring the questions that have been thrown at me here, take them back to them and tell them that we must do something together to ensure that the climate and also our future will reach that treasure.

Dr. Azman bin IsmailPKR · PHKuala KedahEN

Honourable Minister...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

So, I want to return to— I apologise, I have to finish because I have government business overseas.

Dr. Azman bin IsmailPKR · PHKuala Kedah

Sedikit sahaja.

Dato’ Dr. Xavier JayakumarPKR · PHKuala Langat

So, saya kena- I have to take a flight after this, so please. Bagi saya habiskan ya.

Dr. Azman bin IsmailPKR · PHKuala KedahEN

One minute, Honourable Minister. One minute.

Dato’ Dr. Xavier JayakumarPKR · PHKuala Langat

Ya.

Dr. Azman bin IsmailPKR · PHKuala KedahEN

Thank you, Mr Chairman, thank you, Honourable Minister. On rivers and also on forests, I understand this is a sensitive issue and also a state issue. But when we discuss forests, for example, at the palm oil delegations abroad the data does exist. The problem is that the data is not the same as what was mentioned by the Right Honourable Prime Minister regarding our total forest area, for example. So, there must be close cooperation between the various ministries, multiple ministerial effort, one. Second, there must be people who speak with every state government so that they always adhere to what has been agreed regarding forests and plantations and so on. Thank you.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Thank you. Indeed, we now have three ministries working together to ensure that we adhere to the statement we made in 1992 at Rio, that we ensure 50 per cent of the land across the country will be gazetted as permanent forest. Now the figure we have is 55.43 per cent of our country is permanent forest. But apart from that forest, HHSK and so on, that is the need of each state. Every year we issue several hectares for logging licences and so on. Therefore, I think we must reach an understanding that we need to cooperate with JPSM. We must ensure that these areas that we will release are not included in water catchment areas. That is important for us to follow. I am pleased and glad to state here that several states have agreed with the Ministry and have also gazetted certain hectares of land, such as the states of Kedah, Terengganu, Kelantan and Perak, which have agreed to keep several hectares under what is called the water catchment category for the future. So, I extend my thousand thanks to everyone.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Honourable Minister...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Floods. Yes, yes, yes.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

I congratulate the Honourable Minister on his view regarding several states whose forest reserves are gazetted as national parks. The question I raise is the extent of compensation paid by the Federal Government for the sacrifice of state governments whose revenue cannot be collected because of the reserve for national parks, thank you.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

This year, Honourable Member, we have made payments to every state with allocations determined by the Minister of Finance. Where we ask each state to guarantee and give us several hectares to be gazetted. Following that, the value of each hectare will be assessed. For example, this year, up until 30 April 2019, the water catchment compensation debts are as follows. Kedah RM1.8 billion, Johor RM334 million and Kelantan RM800– all in all, these are for every state for which we have made allocations that we have begun to give. This year there is already RM60 million that we have given to all the states...

Pahang, Pahang, Honourable Minister. The state of Pahang.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

If it concerns these figures, I do not want to state wrong figures, so it is better I give the Honourable Member the details in writing, as well as how many hectares have been gazetted and what value has been given to each state. But the overall amount is RM60 million that has been allocated and has already been given to the respective states. But this year. Next year we have more, but we must cooperate. Where the states must determine that the range of hectares to be given is larger, and we can see which method we can use. At the same time, to increase income within the respective states, we can use areas of national parks, certain areas within permanent forest reserves, for ecotourism. Now people are ready to pay big dollars to stay in the forest. They like to stay in the forest. For three nights, four nights, they are willing to pay up to USD1,000 for one day. There are people, there is a need that we can utilise in the respective states. I hear that Kelantan has a waterfall that is the tallest in Southeast Asia. That area can be developed with certain people who will come and bring funds to invest in that area; the state must agree on this issue. Many Honourable Members have raised the issue of requesting clarification on Item 15000 – Small Works of JPS, Various States. Where in 2019 the allocation was RM22 million but only RM100 thousand for 2020. The answer, Honourable Members, is that in the Eleventh Malaysia Plan the approved project cost for Item 15000 – Small Works of JPS, Various States is RM100 million.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

However, expenditure for 2016, 2017, 2018 and 2019 has reached the approved project cost. This means the allocation ceiling has been exhausted. To ensure the item remains in the application for additional project cost ceilings, and additional allocations can be made in 2020, a token of RM100 thousand has been placed under this item. The allocation requirement for 2020 will be applied for during the future supplementary allocation session. So, do not worry, in March I will apply. I know many here have already asked me to look into this issue. I will request a reasonable amount from the Ministry of Finance in the budget in the third month to come.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Another issue raised by many Honourable Members is the forests and wildlife in our constituencies. The Central Forest Spine is the only one that we must cherish and preserve as our national heritage. I call the Central Forest Spine the Tiger Corridor, from north to south. There are three areas of the Central Forest Spine concerned, from the South, namely Endau-Rompin, the National Park, and also the forests in Perak and Kedah. Okay, never mind. But what we see is that some certain areas within this Central Forest Spine have been used and given by the respective state governments to be developed as plantations in certain areas. This is what we have seen as results in the Central Forest Spine. So, through JPSM we have already begun to replant areas where the land is still under state government or Federal Government. But there are many areas where titles have been issued to private companies, which means we cannot enter that area because it is not our land. If we want to do something where we want to establish the Central Forest Spine with contiguousness, we must buy that land and plant trees on it. Therefore, I think we will start in certain areas where we hold the power to do so. I want to tell these Honourable Members that planting forest trees is not easy. We plant them for one hectare, and look after them for three years. We must plant, then we must ensure the trees grow to three or four metres in height. After that, leave the trees and they can become large trees. But before that we must control, we must fertilise, we must monitor the situation. For one hectare for us to plant forest trees, our expenditure is about RM48 thousand for three years. The allocation from the government for the Eleventh Malaysia Plan is RM150 million, where we have planted several thousand hectares, but half of that allocation must be used to regulate the trees we have planted. Three years after we have planted, in the fourth and fifth years, that allocation will be used to ensure the areas we have planted become forest for the future. Here I request cooperation from the state governments, corporations and also private companies to join us in this programme where we will plant one million trees for the future, in the next two or three years. I ask for everyone's cooperation so that we can make this project a success in the area. And also wildlife. Wildlife is an issue we have already raised earlier in this august House. I have— we have also conducted a survey which will be ready next year, and from that survey we will obtain up-to-date data on wild animals in our forests across the country. But at present, the Malayan Tiger Conservation Programme continues. Last night, with the cooperation of AirAsia, we presented one aircraft where they painted the Malayan Tiger, with 'Save the Malayan Tiger', and if you board that aircraft, all the writing throughout the aircraft is about the Malaysian Tiger. I thank AirAsia and also Tan Sri Tony Fernandes, who spent more than RM1 million to bring awareness of the Malayan Tiger to the general public in our country. Yes, Honourable Member for Arau.

Honourable Member, just a little. I ask to turn back a little because I see my notes here, that on 22 April 2010 we ran a campaign of 26 million trees to match 26 million population. Our achievement, with permission...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

What year was that?

The year 2010. On 22 April 2010, in conjunction with World Forest Day, we planted 26 million trees, and then we achieved 50 million. A total of 50 million. So, if the Honourable Member proposes one million trees, I think that is far too low. I propose that we launch 33 million trees, the same as the population of Malaysia. [Mr Speaker takes the Chair of the Committee] I want to tell the Honourable Member, I am among those who can help for free without taking any name, discreetly through NGOs to assist at least one-third of these 33 million, I will give a contribution through NGOs.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Thank you, it has entered the Hansard. So, I will hold firmly to what you have said.

It has entered the Hansard, and I want to launch 30 million, I will broadcast at least 10 million, but there is no need to mention names. I don't need, I don't need a name.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Thank you, Honourable Member for Arau. Thank you, Honourable Member for Arau.

Then this matter— the Malayan Tiger tag just now. How he condemned it, then like...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

We will plant, okay. Honourable Member for Arau, let me finish first. We will plant 100 million trees in the next five years.

100 million trees, is it? Okay. I fully support it, but the form— I want to tell the Honourable Member. I have experience because I am a former Menteri Besar. I planted trees within three years, I could achieve about 20 to 23 feet. So, why are these trees tall? There is a technique, because trees are living things; there is a technique that enables them to grow up quickly and fast. The Honourable Member can, and now, I am planting, previously I planted as Menteri Besar, a total of 86. Now the Perlis State Government is harvesting the trees I planted.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Okay. Thank you, Honourable Member for Arau.

Mr ChairmanEN

Honourable Member for Arau, the Minister must continue. Otherwise, the aircraft will be left behind.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I also want to answer the question that was raised...

Mr Chairman, this is about trees, right? You answer other matters about this Ministry. Trees are a key factor.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

...What is the status of the National Biological Diversity Policy or DKBK. The DKBK was launched in February 2016..

Sorry Honourable Member, about the paper tiger just now. About the Prime Minister, the paper tiger just now, the Honourable Member mentioned...

[Dewan riuh]

Mr ChairmanEN

Honourable Member for Arau, the Honourable Minister has to leave early today.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

This DKBK was launched in February 2016. Its policy has 17 targets covering aspects of biodiversity such as forestry, protected areas, access to and benefit-sharing of biological resources, and mobilisation of related resources and funds. This Ministry is in the process of preparing the Sixth National Report to the Convention on Biological Diversity (CBD), which will assess the 17 targets of the DKBK. The DKBK review process will be carried out in 2020. With the question of when the Wildlife Conservation Act 2010 [Act 716] will be amended? The draft amendment to Act 716 has been completed and was brought to the Cabinet on 8 November 2019. This draft amendment will be brought to the Attorney General's Chambers for review before being tabled in Parliament, and I hope we can table this bill in March next year. Amendments to this Act include an increase in the fine rate from a maximum fine of RM500 thousand to RM1 million, and also an increase in the maximum prison sentence from 10 years to 15 years. This measure is expected to be effective in efforts to prevent wildlife crime. What is the Ministry's enforcement plan to prevent illegal poaching? The Ministry will continue Operasi Bersepadu Khazanah with the cooperation of the PDRM, the Forestry Department Peninsular Malaysia and NGOs, which was launched on 3 September 2019 to combat illegal poachers regardless of whether they are VIPs or foreigners. At present, OBK is seen to be very effective in combating illegal poachers, with 47 arrests between September and November 2019.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

The highest fine that has been imposed by the court on offenders of this wildlife is RM1.56 million and 18 years' imprisonment. This Ministry is also working together with the International Police, or INTERPOL, to combat cross-border crime in the country. For the Honourable Member for Kubang Kerian, who has already asked about the legal mechanism to ensure mangrove trees cannot be felled. I want to say that the issue of mangrove trees not being felled, but we also have a problem with mangroves. Although many Honourable Members say we will start planting these mangroves, we have already started with these mangrove plantings. The problem is that it is not an easy task. The waves in these areas we must take care of. If we do not stop the waves coming from the sea in the areas where we have planted those small mangrove trees, all the trees will be destroyed. We must ensure that the wave breakers, which we say we must build first before planting mangrove trees in the area, have been carried out by JPSM (Forestry Department of Peninsular Malaysia) in several areas and places in Peninsular Malaysia. The Honourable Member for Kuala Kangsar has asked for an explanation regarding the planting of 66 million mangrove trees, the allocation expenditure of RM2 million in 2020, and the estimated cost of planting mangrove trees per hectare. Mr Chairman, for Item 08601 – Planting of Mangrove Trees and Suitable Species at Coastlines, it began in 2005. Since the implementation of this programme until 2018, an area of 2,873.99 hectares has been successfully planted with 6.6 million trees of various species. In 2020, an allocation of RM2 million covers planting and maintenance activities as well as the organisation of public awareness campaigns. The cost of planting mangrove trees and suitable species is RM12,500 per hectare. I will give a brief explanation in response to the question raised by the Honourable Member for Kubang Kerian regarding the felling quota for the states of Peninsular Malaysia for the RMKe-11.

Dato’ Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

I thought a written reply would be fine.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Okay, I will give it in writing, that is better. The Honourable Member for Setiu has also asked about the tree issue, so I will provide it in writing. Okay.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

The Honourable Member for Bachok asked me what is the total area of water catchment forests across the country. For the information of the Honourable Member, section 10(1)(e) of the National Forestry Act 1984 [Act 313], which has been adopted by all states in Peninsular Malaysia, provides that the state authority, through a notification in the Gazette, classifies permanent forest reserves as water catchment forests in order to maintain their function as a source of the nation's water supply. The Ministry, through the Forestry Department of Peninsular Malaysia, monitors the gazettement status of water catchment forest areas within the Permanent Forest Estate (HSK) and reports that status at the meeting of the National Land Council (MTN). Up to 31 December 2018, a total area of 809,823 hectares within the HSK had been gazetted as water catchment forest. Measures taken to maintain forest cover are periodic forest management, amendments to the National Forestry Act 1984 and the Annual Allowable Cut (CTT). The Honourable Member for Jelutong has also asked about the effects of rising sea levels and the submergence of major towns in Malaysia. I think this answer is easy because with climate change, we must ensure that we work together with all ministries and agencies, where recently the Right Honourable Prime Minister launched the Sustainable Development Goals, and we as Honourable Members must hold programmes in our respective areas to ensure that these Sustainable Development Goals will be achieved by 2030. With that, we will ensure that the sea level does not rise, and what we have been told from the existing reports is that by 2050 some coastal areas will disappear with rising sea levels. That is an assumption, but if we work together to ensure that the temperature rise is not more than 1.5 degrees or does not reach five degrees, we can say these areas are safe. But if we do nothing at all, Perlis will lose much to the sea that rises, and coastal areas will be affected too.

Honourable Member, very good. This information shows at the same time that some Members of Parliament will lose their constituencies because their towns have already sunk. Okay, that is good. This report is an early warning to most areas that are urban areas, so many of these urban constituencies are PH people. Thank you...

[Dewan riuh]

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I think the Honourable Member for Arau will lose his Parliament seat, that is...

[Dewan ketawa]

Tuan Cha Kee ChinDAP · PHRasahEN

I support it, Honourable Minister... [House in uproar]

Mr ChairmanEN

[Laughter] Alright, Honourable Minister.

Honourable Member, regarding the issue of the increase, although our time is up, I thank you for the answer given. However, the news I read earlier was very shocking because its headline says, "Nine Malaysian Cities That Could Be Submerged When Sea Levels Rise In 2050". So, I am really worried and hope that with the answer given, we will be able to overcome this problem. I thank you for the feedback given.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Finally, I want to talk about one issue regarding e-Tanah only. This e-Tanah has been implemented with the cooperation of the Ministry of Water, Land and Natural Resources, and now e-Tanah has been implemented 100 per cent in the Federal Territory. I urge all Honourable Members to visit the PTG Offices in the Federal Territory to look carefully at how this e-Tanah is implemented. I have been told that in the Federal Territory after e-Tanah was implemented, a 100 per cent increase in online revenue collected by PTG has been seen. So, I ask that we hold a programme for Perak. We will hold programmes for other states, and I hope these states will agree with the Federal Government to hold this e-Tanah programme in their respective states to be processed and launched.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

Another matter is that we will make changes to the Act whereby inherited land and also land that has been gazetted and so on, we have a new mechanism through which we will try to resolve this problem. We understand that this problem is because the land is small and many people are interested in buying this land, so we must give power to one officer to determine if that is a majority agreement, to resolve this problem, we will follow it. We will bring that to Parliament to make changes to the e-Tanah Act. Mr Chairman, I have finished.

Tuan Pengerusi.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I will answer the others in writing.

Mr Chairman, I seek the certainty of the Honourable Minister about what I mentioned regarding the Department of the Director General of Lands and Mines (JKPTG) on lands under this title that are to be developed. I request a written reply, and also regarding the issue of Malay reserve land, I request a written reply so that it protects...

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

I can summarise. I can summarise my answer about lands owned by the Federal Government under JKPTG. Indeed we have a lot of land under JKPTG, but these lands have already been handed over to the respective ministries. It is the responsibility of the ministry to develop these lands, but there is a provision given in this situation whereby within a period of five years, if any ministry does not develop these lands, it must be returned to PTP.

Dato’ Dr. Xavier JayakumarPKR · PHKuala LangatEN

After that, we will give this land to any ministry for development thereafter. That is the method we have. However, I will give a written answer to the Honourable Member on Malay reserve land.

Okay, Honourable Minister. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, Honourable Minister. Alright, the next question is that the sum of RM1,276,283,000 for Purpose B.23, under the Ministry of Water, Land and Natural Resources, forming part of the Schedule, shall be agreed to. [Question put and agreed to] [The sum of RM1,276,283,000 for Purpose B.23 ordered to form part of the Schedule]

Mr ChairmanEN

The question is that the expenditure of RM3,500,450,000 for Purpose P.23 mentioned in the Development Estimates 2020 shall be approved. [Question put and agreed to] [The sum of RM3,500,450,000 for Purpose P.23 approved as part of the Development Estimates 2020] Thank you all. Now we move on to the Ministry of Rural Development.

Bill — Supply Bill 2020 and Development Estimates Motion 2020 Committee — Head B.22 [Schedule] - Head P.22 [Development Estimates 2020] -Bill

Mr ChairmanEN

Supply Head B.22 and Development Head P.22 under the Ministry of Rural Development are open for debate. I have prepared a short list of these. It seems there are more debaters this time. So, we have to limit each to five minutes.

It is alright, even five minutes.

Tujuh, tujuh.

Mr ChairmanEN

Seven? Alright, let us start with seven, but I think we have to reduce. Alright, let us see how the situation is. I invite the Honourable Member for Beluran to begin the debate. Please proceed.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Thank you, Mr Chairman. I refer to several items under this Ministry, namely Item 02300 – Rural Roads, Item 02003 regarding water supply for Sabah and Item 01703 regarding electricity supply for the state of Sabah. Mr Chairman, yesterday I referred to the Berita Harian news report yesterday, with the headline stating that residents walk eight hours to the main road. It was said that residents of Kampung Sugut walk eight hours to reach the main road due to the absence of a good access road. It involves several villages such as Kampung Mangkasulap, Kampung Nakadong, Kampung Tagapalang, Minsusurat, Mantub, Waigon and so on, to reach the main road at Kampung Gana heading to Kota Marudu. I am not shy to say that this news is true, although slightly exaggerated on the number of population involved, it was said 2,000 but a little bit exaggerated. However, the matter of the road is a correct, true news report and it happened in my Parliamentary area. I am also not shy to say that Parlimen Beluran, Daerah Beluran is among the districts recorded as having a two-digit poverty incidence, 12.1 per cent. That is a fact. I am also not shy to say that there are 1,182 heads of households (KIR) who are classified in the category of hardcore poor in the Beluran Parliamentary area and 1,070 KIR categorised as poor. So between hardcore poor and poor, more than 2,200 heads of households are recorded. That is a fact. Therefore, when referring to the 2020 Budget under the item Rural Roads. I would like to know from the RM880 million listed in the schedule of items of this Ministry, to what extent will the roads in my area be given attention and allocation through this allocation? This includes Jalan Nangoh Meliau, Telupid, Jalan Sapi Menduring, Jalan Lumau Kapuran Telupid, Jalan Sualok Lidung Beluran, construction of a road connecting a bridge to link Jalan Kampung Ansuan and Kampung Berayong, construction of a bridge to link Kampung Tebidong-Bidong with Kampung Perancangan, Jalan Lingkabau Mangkasulap, Jalan Kabuluh Tanjung Nipis, Jalan Golong Pinangkau, Jalan Tangkarason Bawang, Jalan Matanggal Kinadaan, Jalan Lubang Buaya Paitan, Jalan Kampung Monopod, Sugut. How much will be given from the RM880 million allocation for this Ministry for village road projects next year? For rural electricity supply. Rural electricity supply for Sabah, Item 02003, RM350 million is allocated next year. For Sabah alone, RM350 million. Therefore I would like to know how much will be given to Beluran, and whether these villages will have electricity supply. Kampung Rungus Beluran, this matter I have already told the Honourable Minister. There are poles in this village, there are cables, but there is no electricity connection because the transformer has a slight problem, and the problem was conveyed to the Honourable Minister when the Honourable Minister visited Kampung Paitan in my Parliamentary area two months ago. So, I would like to know rural electricity supply, whether Kampung Rungus will receive an allocation from this item. Likewise Kampung Abuan Paitan, Kampung Keniogon Sugut, Kampung Obah Paitan, Kampung Timpus, Kampung Alongai, Kampung Matanggal Baru, Kampung Melalin, Kampung Bebagu, Kampung Monopod, Kampung Bukit Besi, Kampung Pinuanakan, Kampung Kolapis Seberang, Kampung Lubuk Dungun Beluran. How much? Okay, Item 01703 - Rural Water Supply Sabah is allocated RM216 million. A water plant, whether a plant will be built for Mukim Lingkabau, Mukim Ulu Labuk Kopuron, whether the water supply problem in Kampung Ulu Labuk involving Kampung Kopuron will receive an overflow allocation. Whether Kampung Pulau Jambongan will receive an overflow, whether Kampung Sungai Sugut will receive an overflow from the RM216 million Ringgit allocation.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

So Mr Chairman, Beluran needs allocation assistance specifically for the state of Sabah. If distribution is made as before, surely Beluran will continue to be left behind from the currents of change and development desired by the people. I am worried that after the report of the Eleventh Malaysia Plan, Beluran will again be recorded as among the districts in Sabah that still record a two-digit poverty incidence. So, I ask that the beginning of the 2020 Budget next year be given more attention to the problems of electricity, water and village roads. I am confident that not all of these villages will receive an allocation, and that the problems will be resolved, but I believe that the ministry under this new government will focus more on Parliamentary areas recorded as having high poverty incidence. Therefore more attention, if the previous distribution- that is why I ask that the method of distributing future allocations must be changed and attention given to villages with high poverty. That is all, Mr Chairman. I beg to move.

Mr ChairmanEN

Thank you, Honourable Member for Beluran. Now I invite the Honourable Member for Kuala Kangsar.

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Thank you, Mr Chairman. I will go straight to the statement of the Honourable Minister that this budget will focus on programmes that have a direct impact on rural communities, especially village roads and the housing projects for the poorest people. I have several specific questions for my constituency, the Kuala Kangsar Parliamentary area. Item 02400 – Village Connectivity Roads. I ask the Honourable Minister to state how much allocation for village roads in the Kuala Kangsar Parliamentary area has been applied for for so long.

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Next, Item 050400 – Operation and Maintenance Cost of Village Street Lights. As the Honourable Minister stated last week, a total of 60 thousand village street lights will be supplied. The Ministry of Rural Development over these two years, compared with an allocation of only 10 thousand street lights previously. The Ministry of Energy, Science, Technology, Environment and Climate Change (MESTECC) will add 15 thousand street lights of the diode type, LED light emitters, making the total 25 thousand. It is understood that the ministry has also obtained allocation approval from the Prime Minister involving 35 thousand street lights recently, making a total of 60 thousand street lights for this year and next year. My question is, are the 25 thousand LED street lights approved by MESTECC and the 35 thousand street lights approved by the Prime Minister of the same type. Second, what is the estimated cost of maintaining the existing village street lights, especially in villages in Kuala Kangsar Parliament? Third, which ministry agency is involved and responsible for the installation work of these street lights, and what form of regulation will be carried out to ensure that the newly installed street lights truly function continuously? I now move to Item 030000 - Rural Economic Empowerment, Item 030100 - Village Entrepreneur Development. My question is, does the reduction of RM364 thousand for this allocation mean the ministry is no longer interested in promoting village entrepreneurs' products? How will the ministry create continuity for the Rural Development Hope Plan 2018-2023 launched last October, which includes the strategy of developing a conducive business environment through reducing the budget for village entrepreneur development?

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Ahead of Visit Malaysia Year 2020, how can the allocation under this item help batik and handicraft entrepreneurs who run their businesses in village areas located at the tourist destinations of choice in the country, such as in Terengganu and Kelantan? The Income Enhancement Programme (PPP), a mentor concept. To date, more than 500 people have benefited from it. What is the ministry's target for 2020? How much is the specific allocation for the Rural to Global Programme implemented to help market the products of village entrepreneurs to the global market? I move on to Item 04000 - Human Capital Development and Education, Item 040300 - Community Development (KEMAS). How can this reduction in the allocation for KEMAS improve the quality of early childhood education services to be on par with private paid kindergartens? How much is the specific allocation for each Taman Asuhan Kanak-kanak (Taska) in the states? Secondly, for each Taman Bimbingan Kanak-kanak (Tabika) in the states? And how much is the specific allocation for skills education that women in my area have been eagerly awaiting, because in the BN era it was proven successful? (i) cookery centres; (ii) sewing centres; (iii) handicraft classes; (iv) personal grooming classes; (v) family welfare education; and (vi) computer literacy centres. What form of improvements will be implemented specifically for the KEMAS Skills Academy, which offers full-time courses at skills certificate level consisting of the Malaysia Skills Certificate and the Malaysia Skills Diploma? What is the ministry's plan to ensure that skills-based education in the field of sewing has its education module quality enhanced? Will there be job placements for them in the fashion and design field, which is increasingly lucrative? Will the allocation for KEMAS be fully utilised by the ministry in recruiting new teaching staff who are not only experienced, but also have experience in the fields offered by the KEMAS Skills Academy? Item 03020 - Public Welfare. Public welfare is very closely linked to the issue of rural-to-urban migration, because welfare must be viewed in the context of economic capacity to provide returns to the people, and because of the limited economic opportunities in rural areas, migration to the cities becomes the choice of young people seeking employment. My question is, how can this increase in allocation offer new opportunities to rural communities in the employment sector? Secondly, which industries are seen as having potential to be developed in rural areas so that rural employment, with permission, can be created? What form of synergy is implemented by the ministry together with the Ministry of Economic Affairs in efforts to uplift the people through digital economic development, which is expected to adopt 5G Technology and artificial intelligence, with permission? Item 030300 - Majlis Amanah Rakyat (MARA), UNI Klinik. Many are interested, Honourable Minister. How much is the specific allocation to develop UNI Klinik for 2020 and up to October 2019, and how many UNI Klinik have been successfully registered? Secondly, how much is allocated for the Professional Entrepreneur Development Programme (PROSPEK) in the implementation of UNI Klinik? What is the target number of professional medical entrepreneurs who will operate these UNI Klinik? What is the expenditure cost for one entrepreneurship seminar and training, and secondly, for business consultation?

Datin Mastura binti Mohd YazidUMNO · BNKuala KangsarEN

Which agency or company operates the PROSPEK entrepreneurship seminars and training for the implementation of this UNI Klinik, how much loan is available for doctors who have completed housemanship to start a UNI Klinik, and what specific criteria must they have to qualify to operate this UNI Klinik? Lastly, Mr Chairman, Item 00602 - Maktab Rendah Sains MARA. A reduction in the allocation of more than RM16 million raises questions about the government's seriousness in producing bumiputera children educated through MRSM. How can this reduction in allocation ensure that the quality of MRSM education is on par with SBP schools and private secondary educational institutions, and what form of reform can be implemented in the MRSM education system in 2020? Secondly, will the allocation for MRSM be specifically set aside to increase the number of MRSM offering the Entrepreneurial Science programme, which at present is taught only at MRSM IMTIAZ, KETENGAH, the pioneer MRSM for that programme? If so, what is the estimated allocation for that purpose? With global TVET education gaining increasing acceptance, does the ministry intend to make all MRSM in this country into Technical MRSM offering technical education, which currently exists only at MRSM Bentong? Lastly, how much is the specific allocation for the purpose of adding MRSM teachers, especially teachers skilled in teaching Entrepreneurial Science, technical subjects and IGSE, and what is the distribution of the allocation for MRSM Bitara, MRSM Tun Ghafar Baba, MRSM Taiping, MRSM Pengkalan Chepa and regular MRSM? State the distribution of their allocation differences, and state the planning for both types of MRSM based on the allocation differences. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, Honourable Kuala Kangsar. Now I invite the Honourable Beaufort.

Thank you, Mr Chairman. I shall begin directly with Item 02300 - Rural Roads, whose allocation has been increased. I thank the government. I request that under this allocation, Phase 2 of the upgrading of Jalan Sangkabok, Tanjung Aru, in my area be carried out. Jalan Menumpang Tenambak in Kuala Penyu District must also be carried out, as must Jalan Selagun Satu and Jalan Kampung Muhibah in Beaufort, because all of these are projects needed by the people. Jalan Kampung Muhibah in particular was personally visited by the Honourable Minister recently, and it must be shown that our government is so caring toward the people. Furthermore, I also refer to 050500 - Rural Basic Infrastructure. I see that its allocation has increased. So I want to know how much has been allocated for the state of Sabah. I also request that, in efforts to provide this basic infrastructure, coordination be carried out so that the infrastructure projects implemented meet the needs of the people. I request that the roads I have mentioned be carried out: Kampung Menanjung, Kampung Jimpangah and Kampung Siantan in Beaufort District. The suspension bridge needed at Kampung Halogilat, I also request be granted approval. I also request that a new suspension bridge for Kampung Kinamam in Beaufort be carried out. I also refer to Item 030200 - Public Welfare. I want to know the types of programmes implemented under this item. Who is the ministry's target group, and what results or outcome, with permission, are expected from this programme? I would like to propose that the ministry, through the agency closest to the people, namely KEMAS, identify poor families in the villages and implement holistic programmes that can change their lives. For example, after we build PPRT houses for them, if their children cannot afford to be sent to school, have no clean clothes and so on, then we must also help them.

If the mother has no job, she is trained to acquire a skill, to earn income from that skill, and to continue her life, so that what is implemented truly changes their fortunes. I also wish to refer to Item 030100 – Rural Entrepreneur Development. I see here that the allocation for 2020 has been reduced compared with 2019. I want to know how many rural entrepreneurs have been developed so far and what the ministry's target is for 2020. Does the ministry intend to add many more and identify new groups of entrepreneurs for us to develop? Has the type of venture or business to be developed by the ministry for our entrepreneurs in rural areas been identified? How many women are targeted, and how many young people are we targeting? This is because both of these groups are important. Women are those who work hard. Likewise young people; we do not want them to migrate to the cities because they have no jobs. Whereas if we help them holistically, they will be able to carry out their projects and efforts in the villages without migrating, they can continue their lives, and they can also become successful people. Moving on to Item 00611 – GIATMARA Programme. I see RM24,500,000 is allocated. I request that GIATMARA Limbawang and GIATMARA Beaufort in my area be upgraded, with permission, and that the programmes at GIATMARA also be improved, so that its graduates are able to start businesses or ventures that can provide them with economic resources that change their fortunes. I want to see rural children who attend GIATMARA become successful entrepreneurs. This is because I see that they have ability and they work hard, but if we remain on the old track, in the old rut, and what is taught is always the same old thing, then we will not be able to make these people succeed. Therefore, it must suit current demands and the latest technology. There needs to be cooperation between KPLB and other ministries, such as the Ministry of Communications and Multimedia, so that they use the internet, online business and so on. Also, invite designers for sewing and clothing, well-known designers in our country Malaysia, to assist and educate them in clothing design and the latest designs. I see that certain brands also use designs from ethnic groups, which can be marketed to the international level. So here we can make use of, as in our state of Sabah, which has so many ethnic groups whose clothing designs are so beautiful. But if it is left in the old rut, it will surely only be for certain people or certain races. However, if its designs are improved, its reka bentuk, then it can be marketed to the international level. These children who study at this GIATMARA centre are the ones who will receive the benefit or advantage from the government's efforts to produce many more entrepreneurs from among rural people, especially from among our young people, whom we want to achieve success. So, I request that the ministry look at this seriously. Do not remain in the old rut, but look far, beyond our boundaries, beyond the ministry, so that what we implement today will bring the best benefit to our people, especially to our children in rural areas. Thank you.

Mr ChairmanEN

Thank you, Honourable Beaufort. Now I invite the Honourable Arau. Please proceed.

Thank you, Mr Chairman. The first is Item 020400 – Land and Regional Development under Supply Purposes, yes. Mr Chairman, when we introduced regional development in the past, before that we introduced IADP under the Ministry of Agriculture. After IADP, regional development emerged. After IADP, regional development was established. But Perlis lost IADP, and lost it. There is nothing left. We have risen many times in this Parliament. When I was a Member of Parliament, when others were Members of Parliament, we rose many times, and the Honourable Kangar will support me, the Honourable Padang Besar will support me with great vigour, so that regional development is established in the state of Perlis. Agreed? Thank you. Secondly, Mr Chairman, concerning Item 040300 – Community Development (KEMAS). As the Honourable Kuala Kangsar said earlier, we wondered why the allocation was reduced. These are the questions we want to raise regarding KEMAS. Firstly, what are the reasons and obstacles faced by the Department of Community Development (KEMAS) that have resulted in a lower allocation than before? What is the ministry's strategic plan for carrying out all the activities and programmes under KEMAS when the allocation given has not been reduced? Is the reduction in the allocation to KEMAS due to the government feeling that the agenda brought by KEMAS does not help the government very much in achieving the agenda of upgrading the socio-economic status of rural communities? And to what extent can the rebranding of 500 Taman Bimbingan Kanak-kanak under KEMAS's management be implemented properly if the allocation given in Budget 2020 is reduced from before? Likewise, I want to ask, does the ministry agree with the proposal to appoint KEMAS teachers from among youths or graduates who are still unemployed until now, to become KEMAS assistant teachers? In this KEMAS, Mr Chairman, there are also other programmes. In the past, KEMAS introduced, the ministry introduced, the One Village One Product programme, developed together as was done in Thailand, namely OTOP Thailand, One Tambon One Product in Thailand. We see that One Tambon One Product, One Village One Product in Thailand succeeded, Mr Chairman. We feel their success is shown, firstly, by the fact that the products were exported to Malaysia. Secondly, Thai people who came to Malaysia and traded with great vigour throughout the country brought One Tambon One Product items from Thailand here. Our people not only cannot market our products outward, but within Malaysia too, many of our One Village One Product initiatives are gradually disappearing. This is because the strength of our campaigns lies in the launch. When the launch ends, the campaign simply passes. Sometimes when we hold a launch, we give prizes to successful entrepreneurs. So successful entrepreneurs are announced and given prizes, but when the following year we no longer provide allocations, that entrepreneur not only fails but also disappears from the sight of the market and from our minds. So this should not be allowed to happen. Let us look at what is happening in this best neighbouring country; we should take its example and lessons. Then— I do not want to speak at length, because I will hold to my stance, because I was protested against during five minutes, seven minutes and three minutes. As a sign of protest, I will not attend Parliament tomorrow, and I will return my allowance to the government and also to the people, my daily allowance, because I will not be attending Parliament. It is the first time I am voluntarily not attending Parliament, because I am dissatisfied with what has happened.

Secondly, I am dissatisfied because the Election Commission (SPR) has introduced rules in Tanjong Piai. And lastly, I am dissatisfied because our beloved Prime Minister is suddenly not supported by DAP, as if no action is being taken against Ronnie Liew.

Mr ChairmanEN

Which item is this, Honourable Member?...

[Dewan riuh]

Mr Chairman, I still have time. I cannot be disturbed so severely. The next is regarding Item 051200 – Village Community Management Committee (MPKK) Allowance. This allowance has been reduced. Previously we gave RM1,000; now only RM500 remains, but now they want to introduce a Federal MPKK. Eh! Come on man, this is not a trivial matter. Because Pakatan Harapan is the people's hope in this new government to bring reform. If it is found that what we have done is lacking, correct it. If you want to say that what we did is useless and not right, then, because you all are old products, including the Chairman acting as judge, old products now living in a new era.

I am also a product of the older era, now living in a new age. This is something that has happened, and there may be shortcomings. In my time there were no scholarships, but people still became great people, as they do today. But nowadays there are scholarships and loans. So do not say that the old is useless, because all our parents are people of the old era, and we have become fathers to our own children. So we must remember not to bring up the old. For the new, we want to do this, so that the people can see there is hope that this new government can bring change with greatness. But suddenly the MPKK, which was running well, if they say they want to take this, they do not want to take political people. Now why do they want to take political people, who belong to the same political party? Yet in the villages, there are PH people in the kampung, four or five people who lost against the branch chiefs, and afterwards became PH. Now they want to appoint them as chairmen, as committee members. Appoint them, before you were appointed, there is no problem. But we must remember they are not qualified, not capable, have never conducted a meeting, have never been anything. So if this government is truly great, appoint the capable people who are there now. Why must the name Persekutuan be changed? Look at our friends from Sabah and Sarawak, they are hurt. The word Persekutuan is used in Sabah and Sarawak. What, are state governments useless that they must mention Persekutuan? If you truly want to administer, administer directly, there is no problem. You use Persekutuan, administer from here. It is impossible for it to happen without help from the states. So I ask that this MPKK be retained, do not later want to diminish it.

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

[Speaking without using the loudspeaker]

Is the Honourable Segamat standing up to ask a question or to make a speech?

Berucap.

I want to speak, wait. The Honourable Member has not finished yet, with respect, sit down. Sit, sit.

Mr ChairmanEN

It's finished now, Honourable Arau.

Disturbing me, I am pointing to Mr Chairman. So we want this MPKK to be retained. I ask that the current officers of the Community Development Department (KEMAS) give attention to the development of tadika and tabika kindergartens. Secondly, give attention to economic development. Do not let them also be involved in jointly punishing anyone who has ever supported Barisan Nasional. Whoever wants to support PH is immediately given grand labels.

This government, I want to tell Mr Chairman, will not take long, because we see what they are doing now...

Mr ChairmanEN

Thank you, thank you.

...It is more about taking revenge. Mr Chairman, revenge. Not bringing reform, but taking revenge.

Mr ChairmanEN

Yes, as I mentioned just now, this is Item P. 165.

Last item, last item.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

We are already angry.

Mr Chairman

Cukuplah, cukup.

This government must become a government that has hope, and not a government that takes revenge. Although today I am soft-hearted seeing Mr Chairman's face so kind, I hold to the principle of my promise that I am not attending Parliament because of the protests I mentioned earlier, namely first, the Election Commission (SPR) in Tanjong Piai; second, the Prime Minister whom we love is not supported by DAP; and third, the five-minute Parliamentary rule. Thank you.

Mr ChairmanEN

So from Arau, we move to Kangar, please.

Tuan Noor Amin bin AhmadPKR · PHKangarEN

Thank you, Mr Chairman. I take part in the debate on the expenditure details for the Ministry of Rural Development. This is because I have always held that in moving towards the Wawasan Kemakmuran Bersama agenda, the Ministry of Rural Development should become a main ministry that ought to be given additional allocations. However, I realise that today I am informed that roughly 80 per cent of Malaysians have migrated to live in urban areas. So we must think of a way to make rural areas 'seksi' again, meaning people like living in rural areas, and people want a higher-quality life in rural areas. So I want to touch on Head 030000 – Rural Economic Empowerment, in the specific item 030100 – Village Entrepreneur Development. I see the ministry's targets have increased but the allocation has decreased, from RM2.048 million earlier to RM1.684 million. So how will the ministry ensure its targets can be achieved with this reduced allocation? What programmes will be carried out under this allocation? Item 040000 – Human Capital Development and Education, under the breakdown 040200 – Village Communities, amounting to RM4.6 million. I see in the outcomes that one of the aims of the Ministry of Rural Development is to bridge the digital divide. I would like to suggest to the ministry that we in rural areas do not have much land. So community centres are sometimes not used optimally. So what about rural schools, which do not have many facilities, where many schools do not even have computers? So rather than doing it separately, it would actually be better, as people say, for training related to digital matters to be done in cooperation with schools. So we also encourage parents to be close to schools, and children who have fallen behind in their studies can be made familiar with school. Item 050000 – Special Programmes. I see under the breakdown 050500 – Rural Basic Infrastructure. Firstly, I want to make a comment: if possible, let us use Bahasa Melayu. Rural basic infrastructure is not so hard to translate: infrastruktur kemudahan asas luar bandar. The allocation that has increased is quite large, from RM14.49 million to RM35.6 million. So what kind of basic infrastructure is this, because we also read that there are other allocations for roads, we have other allocations for lights and so on. Only, I see that from all these breakdowns, nothing specifically mentions house repairs, although that is the biggest and what is most often done every year.

Tuan Noor Amin bin AhmadPKR · PHKangarEN

I also note that under the Ministry of Economic Affairs, there was previously also an allocation for rural development of RM20 million. That is under Head 00121. So what is the difference between this allocation and the allocation under the Ministry of Economic Affairs? Item 030200 – Community Welfare Scheme. So perhaps house repairs may be placed under this scheme. So I ask for consideration that assistance for house repairs should not be rigid. This is because in many applications before this, we see that one of the conditions is that the applicant must be included in the list of those on eKasih. Yet those on the eKasih list do not necessarily need house repairs. Some people's houses are already in good condition but they need assistance in another form. Some people are already fine in other respects, but their houses are very dilapidated and in bad condition, yet they cannot do anything to repair these houses because they are not on the list. So this needs to be reviewed so that the assistance we give is accurately targeted at those it is meant for. Next, regarding MARA, 00602 – MRSM, RM27.9 million. I believe MARA should work closely with the Ministry of Education Malaysia. I have previously debated the need for fully residential schools to take in more students from the B40, and these students are of course mostly from rural areas. So I think MARA should be the one leading, at the forefront, in narrowing the rich-poor gap in education. Item 00604 – IKM and also 00611 – GIATMARA. Earlier, in the policy debate, I mentioned many projects in the state of Perlis that were delayed, late, not completed, and had to change contractors. Among the main reasons they gave is that there were not enough workers. I believe our training institutes have produced many semi-skilled and skilled workers. So I hope that our graduates from the training institutes under MARA can be matched, or we can align them with industry needs. It is a pity we produce many graduates who, as I said earlier, are semi-skilled and skilled, but they end up doing other work, while many government projects are delayed, postponed, late and not completed due to lack of workers. Next, 00614 – MARA Business Buildings. I have gone to several MARA buildings, and I see that most of these MARA buildings are rather dull. So what are the ministry's steps? What is the first cause? Next, what are the ministry's steps to revive these areas? I see that MARA's chain is excellent. If entrepreneurs have training, have financing, and we have ready premises, but why does it seem to work in silos, as if there is no linkage between all these things, causing– our investment in these buildings is not cheap, these buildings were built at quite a large cost, but they do not give returns commensurate with our investment. In time, like other buildings, they depreciate, so these buildings are also no longer attractive. In the end we have to spend money to maintain and upkeep these buildings, but unfortunately we have not been able to produce great entrepreneurs whom we have trained and to whom we have given financing and so on. Next, 01700 – Rural Electricity Supply and also 02000 – Rural Water Supply. I see that for Peninsular Malaysia, first, 01701 – Peninsular Malaysia for electricity supply, the allocation is very different compared with Sabah and Sarawak. I see that Sabah and Sarawak are given tremendous priority. First, I congratulate you, but please do not assume that the problem in Peninsular Malaysia has been resolved. Regarding water, I hope that priority can be given. Earlier, during the debate, my colleague the Honourable Arau also mentioned, and I have already mentioned it twice, which is why I did not stand up, about the problem of non-revenue water in Perlis, which is now 63 per cent, the highest in Malaysia. I have already said thank you, because I was informed that last year the government allocated RM107 million for water alone in Perlis. But I hope this problem can be resolved quickly.

Tuan Noor Amin bin AhmadPKR · PHKangarEN

So rural water supply should be given priority to areas that often have problems, especially water problems, because in many cases when water is a problem, it is not only a matter of supply but also a matter of disease. If we do not provide clean, good water, disease arises, and so we spend more. We supposedly save by delaying repairs, but we increase costs in terms of health aspects.

Tuan Noor Amin bin AhmadPKR · PHKangarEN

Finally, 02404 – Mega Rural Boost Programme. I want to ask, what is mega about it if the allocation is only RM11.3 million? So, if possible, could the ministry please explain. That is all, thank you, Mr Chairman. I beg to support.

Mr ChairmanEN

Thank you, Honourable Kangar. Now I invite the Honourable Sik.

Assalamualaikum warahmatullaahi wabarakaatuh. Thank you, Mr Chairman. Thank you, Honourable Minister. I shall proceed directly to the debate on Item 020700 – Kedah Regional Development Authority (KEDA). I would like to obtain the ministry's response on several matters relating to this item. First, what is the current total number of KEDA officers, both permanent and contract? Is there a balance in the recruitment of officers relative to the size of the area and the population that must be served? KEDA operates across 89 per cent of the entire state of Kedah. Second, what forms of training and entrepreneurship programmes have been implemented, how has community participation been, and to what extent have they achieved the expected targets? Likewise, the community rehabilitation programme that targets special groups, whether single mothers, senior citizens or orphans. What programmes have been carried out for these groups, particularly to increase their social mobility so that they can escape the shackles of poverty? Next, I would like to ask about the major projects currently being carried out under KEDA, particularly in the District of Sik. I also request detailed information on premises or buildings under KEDA's supervision that are unused or are failed projects, whether SME Centres, shophouses and so on. Next, Honourable Minister, Item 040200 – Village Communities. I would like the ministry's explanation on the programmes that have been implemented to increase the capacity of village communities. What plans were drawn up for 2020? To what extent has collaboration been carried out with other agencies such as the National Anti-Drugs Agency (AADK), particularly in the campaign to prevent drugs, which is so serious in the villages at this time? Likewise what is happening in the District of Sik over there. Apart from that, I would also like to ask about the ministry's collaboration with the Ministry of Education in addressing the dropout of students in rural areas. Many students in rural areas, especially in Sik too, cannot continue their studies due to financial hardship and so on. So, what educational awareness programmes have been carried out to overcome this problem? Next, Item 00602 – MRSM / Science College MARA. I would like an explanation on the status of the construction of MRSM Sik based on the MRSM Ulul Albab Programme, which incorporates the concept of integrating pure science and tahfiz. This project was approved by the previous government under MARA several years ago, but this project has still not started until today. My question is, when will this project begin? What obstacles have caused the failure to start this project? Regarding the status of complementary infrastructure, such as water supply, internet network and so on. To what extent has the development of this infrastructure been initiated by the ministry?

Next, Item 02004 – Alternative Water Supply. I would also like to touch on, in relation to this, the Rural Clean Water Supply Project, particularly in the District of Sik, concerning obtaining a source of clean water from natural sources, namely from hills or existing tributaries. The issue here is the lack of a good piping system and water storage tanks to channel the water for use by local residents. This source is very good to develop because the water source already exists, only additional allocation needs to be considered by the ministry to meet the water needs of the Sik area and other districts too. Therefore, I would like to ask whether a special fund has already been set up to resolve this problem? Next, finally, Item 03200 – Community Welfare Scheme, which is an allocation of more than RM280 million. So, I request the details of this scheme. Will the project for rehabilitating and repairing the houses of poor residents or those hit by disasters also be included in this scheme? In the District of Sik itself, in Bandar Baru Beris Jaya. Although it is named a town, it is actually a resettlement of residents who were relocated due to the construction of a dam, Empangan Beris. There are more than 600 houses there. I have sent a letter to the ministry asking for help to repair 90 houses that were damaged by a storm several years ago. However, until today this project— I mean, the repair of these houses has still not been carried out. These housing units were actually built by the ministry itself more than 10 years ago. So, I ask that this specific project be looked at seriously by the ministry to repair these affected houses. So, that is all, Mr Chairman. Thank you, Honourable Minister.

Mr ChairmanEN

Thank you, Honourable Sik. Next, Honourable Segamat, please proceed.

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

Thank you, Mr Chairman. Referring to Item 030100 – Rural Entrepreneur Development. I would like to ask, what is the focus if this programme is implemented in Segamat District? Because Segamat is said to be a hub for agriculture and also meat. So, I would like to know what projects and how much will be implemented, if any? Item 030200 – Community Welfare. I would like to ask, will programmes of this kind be held in Segamat District, Segamat Parliamentary constituency? So, my office can also help, or we can cooperate in the programme or, we bear the cost together. Item 05300 – Rural Community Centre (PKD). We also find that there are many things in my area that need to be developed. Some are dilapidated and so on. So, I also sent a letter to the ministry on 19 May but up till now have not received any explanation. Regarding Item 050400 – Operating and Maintenance Costs of Village Street Lights. I say it is good that there is an increase of almost more than RM10 million, but many of the street lights requested in my area still have not been provided. This is also included in the letter that was sent to the Minister's Office. Item 050900 – Maintenance and Repair of KEMAS Buildings. I want to refer to a specific one, namely the KEMAS Kindergarten in Kampung Paya Jakas. It has been confirmed by the Fire and Rescue Department (Bomba) as unsafe, but the children are still studying there. So, I hope the ministry will do something because the building is unsafe, dilapidated and so on. If anything happens later, we will be blamed. [Deputy Speaker (Dato' Mohd Rashid Hasnon) chaired the Meeting]

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

As a Member of Parliament, I wish to bring this to the Honourable Minister, because that is not all. So, we know there is a serious problem because of legal matters and so on. Regarding Item 00100 – Skills Education. I would also like to ask, what kind of skills will be provided? Will this be skills together with TVET, or short-term skills? Regarding Item 02000 – Rural Water Supply. In the Segamat Parliamentary constituency, in the State Assembly seat of Buloh Kasap, there are still places such as Kampung Gelang Cincin and so on that have serious water problems, and there is also a tahfiz school that has had no water until now. So, it is not only in Sabah and Sarawak, but also in Peninsular Malaysia, and even in Segamat, the district administrative town. Item 02300 – Rural Roads. I congratulate you, there is a lot of improvement and so on. So, I hope these roads will be built again. Item 02400 – Village Connectivity Roads. RM120 million for the year 2020, I congratulate you. So, I also hope that village roads will be given attention, especially in my area. Item 02503 – Rural Economic Development. This is something good although it is only RM20 million, I would like to know what the focus is? What is the direction and how will it be implemented? How can Parliamentary offices like ours cooperate with the ministry? Another matter I want to ask is with reference to the letter I sent to the ministry dated 11 April 2019. I would like to read out that for village connectivity roads, we have 16 applications that have been submitted through the district office amounting to RM3.29 million. Number two is Rural Roads (JLB), 21 projects still pending amounting to RM1.97 million.

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

Third, Item 02000 – Rural Water Supply (BALB), 11 projects in the Segamat Parliamentary district, RM8.92 million, these still have not been carried out. Fourth, Item 01700 – Rural Electricity Supply (BELB), RM1.3 million, and finally village street lights, four projects that have been applied for, RM310 thousand. All of them total RM15,770,000, and these are programmes and projects that have been applied for through the district office and the Johor State Government, but up till now they still have not been implemented. Moreover, I have written a letter but have not received any reply until now. If it were the previous government, I would understand, but this is a reform government, so it should have already been answered or I would have assumed it had already been included. I hope the ministry, the Honourable Deputy Minister, will take this matter seriously because the Honourable Deputy Minister, this matter is very important. I am a Member of Parliament from rural areas. This has been under BN for more than 61 years, 35 years under MIC, but if the MIC President had been there, they could have solved the problem. However, if this is not provided, they will blame me, it is rather different. I ask the Honourable Deputy Minister to refer to this and try to solve this problem. As I have only two minutes left, I will continue to read out, for example, the Village Connectivity Project to upgrade the road 'Tongkeng Gelugor – Jementah' RM50 thousand, village connectivity road, build road – 400 metres. I have listed them one by one, Honourable Deputy Minister, I have listed them one by one. I have made it easier for the ministry to give justification, to cooperate with the district office and so on. So I sincerely hope that this ministry will take the needs of rural communities seriously. This is a very important matter for me because if we do not implement these projects, then we are not being fair to the Malay Muslim community in rural areas, because we reduce their mobility to go out to work, earn a living and so on. If we want to narrow this income gap, then we must provide them with basic things.

Dato’ Seri Dr. SantharaPKR · PHSegamatEN

Things like roads, road mobility, street lights, they are not asking for BMWs, Honourable Deputy Minister, they are asking for ordinary things. Things that we should give attention to. So I sincerely hope, this is my third time speaking, and I hope I do not have to speak once more because I feel pressured. I feel pressured but I hold my emotions, I speak softly but with burning passion, Honourable Deputy Minister, this burning. Honourable Deputy Minister, in love, eye meets eye and heart meets heart. However, as the people's representative, I hope that when the Honourable Deputy Minister looks at me, that smile means the Honourable Deputy Minister will give serious attention. What we are asking for is only RM16 million, compared with the money earlier which was already billions. It would be good if this could be explained this year. That is all, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Segamat. Now I invite the Honourable Member for Paya Besar, followed by the Honourable Member for Keningau, followed by the Honourable Member for Padang Serai, then the Honourable Member for Limbang, then the Honourable Member for Jeli. Please, the Honourable Member for Paya Besar.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Mr Chairman, thank you to the Honourable Deputy Minister and the government officers who are working hard. I see outside just now some were standing, some were sitting. But most importantly this afternoon, I want to raise several matters, Mr Chairman, relating to this ministry, relating to Item 03000 – Rural Economic Empowerment. This is because I still believe and am confident that most of the Honourable Members who have debated have raised issues involving their areas, and Paya Besar Parliament is also a rural area, and I consider that the Ministry of Rural Development is a very important ministry in ensuring that the aspiration of the Pakatan Harapan Government to implement Shared Prosperity Vision can be achieved better. However, I am somewhat offended when I see that Budget 2020 does not seem to give a clear reflection of the direction of the Pakatan Harapan Government. This is why, in Item 03000 – Rural Economic Empowerment, I must state here that the Honourable Deputy Minister, we should no longer be talking about SMIs. We should be talking for rural communities about something bigger, something more large-scale, not small scales anymore. This is because the migration that was mentioned by my fellow Honourable Members just now is a problem, not a rather small problem but a rather big problem. Although the Department of Statistics, Mr Chairman, carried out a survey in 2018 stating that migration among 32 million Malaysians is only 1.6 per cent. But do not look at this figure as one that does not seem to show that there is migration of young people to big cities. This is because why? We see countries that were previously under us, such as Singapore, when it separated from Malaysia, it developed villages. It created an organised settlement. It considered that these villages must be developed so that near the villages there would be another employment opportunity for local talent. But it has already happened in Malaysia, how we developed Kampung Baru, how we developed Kampung Kerinchi, how we developed Kuala Lumpur, but it did not happen in Paya Besar. It did not happen in the parliamentary areas that are described as rural areas. Do we just want to see something merely as data but not look at it fully? This is because I want to refer to the Migration Survey Report carried out by DOSM. Roughly 24.3 per cent of those who migrate do so because of careers, but if we can create local economies, if we strengthen local economies, I am confident it will provide a good opportunity.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Japan developed villages that previously were strong in agriculture. Today they develop tourism. I want to tell the Honourable Deputy Minister, the Paya Besar area has more than 15 rural tourism areas that should be developed but have been neglected, perhaps because I think Paya Besar is not Kuantan. But the name Kuantan is bigger than the name Paya Besar, perhaps because of district factors. However, I want to tell this august House, I sincerely hope the officers at the ministry, the Honourable Deputy Minister himself and the Honourable Minister must look at Paya Besar as a rural area that we should develop as an ecotourism area. Secondly, Mr Chairman, I want to refer to Item 02000 concerning Infrastructure and Basic Amenities Development. I am confident and believe that once we have a good economic system, infrastructure and basic amenities must be in good condition. Sungai Lembing town, Honourable Deputy Minister, is a former mining area that was once very great, closed down, and today has become a centre of attention for people there. However, there is a problem, Honourable Deputy Minister, namely the water issue. I raised it in the Special Chamber Meeting the other day on 29 October regarding the water supply problem in the town of Sungai Lembing and in the village of Bukit Kuin. I remind you this falls under the Ministry of Water, Land and Natural Resources (KATS), but the Cabinet made a decision on 15 October 2019 stating that all rural water supply be handed over to the Honourable Minister's ministry. I hope the Honourable Deputy Minister will please ensure that the water supply, especially in Bukit Kuin and the town of Sungai Lembing, can be resolved as quickly as possible so that I, next year, the Honourable Deputy Minister does not have to raise this matter again. This is why? When there is no water supply in the town of Sungai Lembing, Honourable Deputy Minister, it will hamper local economic growth, namely the tourism economy. There are many chalets, hotels, but in the end when they go there there is no water, and it will damage the Mosque to Mosque Campaign. Finally, Mr Chairman, I want to touch on Item 04000 – Human Capital and Education Development. I am confident many Honourable Members have debated the quality of KEMAS Kindergartens compared with many private kindergartens or tadika, or those under the Ministry of Education. But the most important thing is how we are going to empower these KEMAS Kindergartens so that they become the first choice again for rural people and urban people. I am confident that if we can produce good teachers, good teachers do not simply come with quality alone. Their salary payment system and their scheme system must also be improved. This is why, Honourable Deputy Minister, if we want good teacher quality, but the scheme is rather poor, I worry that not many people will come forward to become teachers in KEMAS Kindergartens.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Finally, Mr Chairman, I want to touch on Item 050400. This is something, Mr Chairman, that I feel must be resolved by the ministry concerning the operating costs of street lights. What is happening today is that a former chairman of JKK is almost at the stage of being sued by TNB, because when he built and offered himself to be the nominee, the project was in Kampung FELDA Bukit Goh involving 15 street lights, and in the end the bills were put under the name not of the JKK chairman but of an individual. I really hope the Honourable Minister will please help. Now he no longer even has the position. In the end he has had to bear the debt, electricity bills reaching RM50,000. So I really hope it can be resolved by the Ministry of Rural Development. Thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Paya Besar. Now I invite the Honourable Member for Keningau.

Thank you, Mr Chairman. I have five matters to raise here. First, I would like to refer to page 210, Item 20000 – Services and Supplies, where the overall allocation has decreased compared with last year's allocation, and I do not see why, when the government has a programme to reduce the development gap between urban and rural areas. Perhaps the Honourable Deputy Minister can explain this. Second, the issue of Item 020000 – Rural Infrastructure and Basic Facilities. There is an increase in this allocation, but there is no specific allocation for the development of the Sabah and Sarawak regions as there is for the states in the Peninsula, and I would like to know why. Is this because the Regional Development Authority in Sabah and Sarawak does not exist? Yet even though it does not exist, can the development allocation not be channelled through the State Economic Planning Unit of each state? Third, I would like to refer to Item 030000 – Rural Economic Empowerment, specifically Item 030100 – Village Entrepreneur Development and 030200 – Public Welfare. Usually this rural development prioritises basic needs such as electricity, water, roads and so on, and all of these are good for rural areas, but in the end electricity bills must be paid, water bills must be paid, car petrol must be paid, and if the economy and the people's income do not change, they will become poorer. Therefore, in my constituency I have considered a mechanism to help these rural communities improve their economy and income through a system that I have named the Rural Micro Business System (RMBS), which will provide an organisation or system in which all rural communities will become participants in developing and advancing their land in terms of agriculture, and this system will help in terms of processing and marketing. However, this system requires assistance from the government, and this is where these allocations may be channelled through the implementation of this system, namely RMBS, and I request that the RMBS system be accepted as a mechanism to help the rural economy, especially in my constituency in Keningau. I would also like to refer to Item 040000 – Human Capital Development and Education, which has an allocation of RM156 million, and here Sabah does not have a channel to obtain this allocation. Therefore, I would like to propose that the People Development Foundation (Yayasan Pembangunan Insan), which already exists, be able to take part in this programme to apply for the allocation and carry out human capital training to ensure the success of the Village Entrepreneurship Programme through the RMBS that I have just mentioned. Fifth, with reference to Item 01700 – Rural Electricity Supply. First of all, Items 01702, 01703 and 01707 concerning rural electricity supply as well as street lights. I would like to know whether this allocation has been committed through projects that have been awarded or based on applications and needs in each area. I would also like to ask what type of electricity supply it is, whether through generator power, mini hydro or simply electricity connection? Likewise for Rural Water Supply under Item 02000, where it is not stated how and by what means this water supply will be provided, whether by gravity, sewerage, dams or through pipe connections? I would also like to ask what the difference is between rural roads and village connectivity roads, since the villages are also in rural areas. So, in an effort to provide these rural roads, I request that the ministry look at the specific needs in rural areas to open up land in areas that have no roads.

In Tambunan alone, we have 25,000 acres of grazing land that is not cultivated, and most of this land has no road. Likewise, undeveloped land that has not been developed, which has the potential to generate new income and economy in the villages, but has no access, no roads leading to that land.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Your time is up, Honourable Keningau.

Therefore, I ask that this be given attention. That is all, thank you.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Keningau. I now invite Honourable Padang Serai, followed by Honourable Limbang, Honourable Jeli, Honourable Parit Sulong, Honourable Hulu Terengganu and Honourable Pasir Mas.

Don't forget Papar.

Ledang isn't here?

Tuan Karupaiya A/L MutusamiPKR · PHPadang SeraiEN

Thank you, Mr Chairman, for giving Padang Serai the opportunity to debate at the Committee stage. Next, Item 010400 – Information Management. What are the Federal Government's proposals to ensure that connectivity, in terms of internet and even more so broadband internet, can be strengthened in rural areas? Can the Federal Government provide a detailed cost of such supply, and which rural areas will be given priority? Next, Item 020000 – Rural Infrastructure and Basic Facilities. As Member of Parliament for Padang Serai, I ask the Ministry of Rural Development to provide a more detailed explanation of the infrastructure development plan together with the Kedah Regional Development Authority. My constituency consists of villages, and I ask the ministry to pay serious attention, as most of these villages have drains and roads that are not very safe. I hope that serious attention will be given. Next, what is the Ministry of Rural Development's plan for major upgrading in Kedah, for example the Kulim Hi-Tech to Baling road, which should be made into two lanes to resolve the issue of traffic congestion? Third, what are the main basic facilities that the Ministry of Rural Development will allocate to coordinate connectivity between towns such as Kulim and rural areas? Next, Item 030000 – Rural Economic Empowerment. What is the Federal Government's plan to encourage village entrepreneurs to implement Industrial Revolution 4.0? Second, entrepreneurs in the country face many obstacles, including a lack of capital to start entrepreneurship. What is the Federal Government's plan to help address this issue? Third, in terms of business development programmes, what is the strategy or evidence showing that programmes like this are effective in helping village entrepreneurs? I thank and congratulate the ministry and also the Honourable Minister and the Honourable Deputy Minister who have been willing to frequently visit the ground even though we are far behind, and I also hope they come a second time and resolve the problems. Next, Mr Chairman, I support. Thank you.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Padang Serai. Now I invite Honourable Limbang.

Thank you, Mr Chairman. Just a few points tonight, Mr Chairman. One is Supply Bill 22, Item 050900 – Maintenance and Repair of Community Development Department (KEMAS) Buildings. So, in Limbang there is only one KEMAS office, but there are many KEMAS kindergartens, some of which are rented, some in longhouses, and some in ordinary hut-style houses. Previously, to be frank, we have helped a lot personally through the service centre. We hope— I am confident that the KEMAS officers in Limbang, we have worked closely together for the sake of our children. So, it doesn't matter which division. So, I would like to raise that we also want to help, but only within our capacity, there is a limit. So, another one is the item— you can get the list actually, whatever is needed, I mean in full from the KEMAS officer in Limbang. Next is Item 051100 – Equipment and Facilities for KEMAS Kindergartens and Childcare Centres. For the information of the Honourable Minister, sometimes we from the service centre help, to the extent that at one time we helped buy a refrigerator for the children for their food in these rural areas. So, also the same things, I ask, if possible, Honourable Minister, please request the full list of whatever is lacking in equipment and so on. Some of them are indeed very dilapidated, but we try our very best, Honourable Minister, with permission, to help also before this. Next is P.22, Item 00611 – GIATMARA Programme. During the policy stage I also asked about this on that day. It's not that, Honourable Minister, just that this matter has been quiet for a long time. What is the status of the construction of this new GIATMARA? I repeat this at this Committee stage. Regarding that land, it is very nice, in a new town area, it is a good place lah. It is not that the land provided is a site that people say is difficult or not good, but it's a very nice place. A beautiful area and a new town. I hope the state government has prepared it and I hope the premium has been paid, so that no land problem arises. We hope that now, for the Honourable Minister's information, previously he knew that GiatMARA was sharing with the old Resident's Office. I also raised before here the dilapidated condition, but I know that there has indeed been maintenance work done since I raised it here. Actually, it is the only skills training centre in the Limbang Parliament. Also, we don't want to miss this, we love GiatMARA, it really produces our children who have skills. If possible, add courses, at this time I know there is only welding and air conditioner there. If the GiatMARA complex that has been approved can be built, we can do more. Next is P.22, Item 01702 concerning rural electricity supply in Sarawak. Again, Honourable Minister, during the policy stage I also stated that day about the Jampong longhouse. Just that there is a recent request, can the Honourable Minister, before Christmas this year, that is an expensive request, Honourable Minister. If possible, please consider it, it is true that for some years in the past they used generators. Since the matter is there, that day I asked a little, if it can be arranged before Christmas this year, that will be a very good Christmas present for the whole longhouse at Jampong. Next is P.22, Item 02300 – Rural Roads. At this time, the road is at phase four. Telahak, Meritam, Bong Abai, Pengkalan Rejab road phase four. There is indeed work activity, but that is from our observation, it seems there may be a delay, Honourable Minister. So, it's not that, this concern has a reason, phase two is still left unfinished, and the Honourable Minister's answer that day was that phase two will be implemented by the phase four contractor once they finish that. However, hopefully from observation. So the question is, I would also like to know what the actual progress on the site is. In their records, what is the actual progress? I see there is also a bridge, that bridge too, I see that we, the people on the site, Honourable Minister, it seems perhaps— I am very sure they are delayed there. Please, if possible, speed it up so that phase two can also be implemented afterwards.

I think that is all, Honourable Minister. I hope that with these details at this Committee stage, we will receive good news from the ministry. Thank you, Mr Chairman.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Limbang. Please, I invite Honourable Jeli.

Thank you, Mr Chairman. Firstly, the Ministry of Rural Development (KPLB), we are well aware its role is very large in improving grassroots socio-economic status, especially in the context of the Shared Prosperity Vision introduced by the government. It is an important ministry in advancing the structure and economic position of villagers. Therefore, we congratulate all officers and the Minister and we hope that efforts will be redoubled.

First, P.22, Item 02300 – Rural Roads. Congratulations for the allocation being increased to 880, while Village Connectivity Roads was reduced to 120. So, two matters. The first is, we want to ensure the quality of these roads is good, as we are aware that some contractors, sometimes just a few months after completion, the roads already have potholes. So, in this regard I want to know, from the allocation for rural roads and also village connectivity roads, whether part is allocated for new roads and part for road repairs. Because we find that old roads, which perhaps due to insufficient maintenance, need to be patched again where there are potholes. We find that in these villages, much of this happens perhaps due to a lack of allocation previously. Second, Item 020600 – Southern Kelantan Development Authority (KESEDAR) and Development Item 03900. KESEDAR has played a major role in developing Southern Kelantan, towns such as Gua Musang, Kuala Krai, and also Jeli. To a certain extent, KESEDAR's role is very large, and we congratulate it through infrastructure. So, previously in this area it was oil palm, rubber and fruit. Does the government plan to review this rural development model, including modern agriculture? Perhaps Musang King, durian, livestock, we are aware that we face a very large import bill and food security is a major problem. So, how should KESEDAR, with permission, align its role to ensure that it transforms into a dynamic organisation capable of generating new income for village communities? The livestock sector, for example, promises fairly good returns, as does cash crops, and we want to know how KESEDAR can help ensure the country can reduce its import bill. I want to know whether, after KESEDAR has been established for such a long time, the government plans to conduct an impact study on how KESEDAR has reduced poverty rates, how KESEDAR has developed towns and so on? In this regard, I call for, compared with Gua Musang for example, Jeli is a little left behind. Are there plans to build several buildings to enable a new growth centre in Jeli? That relates to KESEDAR. Third, relating to KEMAS. Item 050700 – Emoluments of KEMAS Permanent Staff and also Item 050090 – Maintenance and Repair of Community Development Department (KEMAS) Buildings. KEMAS has played a major role in educating our children, but we know there is competition from pre-schools, which have taken many of these students. We know KEMAS has made appropriate adjustments. I want to know how the curriculum is aligned with current needs, making students more open-minded, more competent, of noble character, in religion and culture, all of it, because we know the school system is being radically changed, so likewise especially for students, our children who are under six years old, because at age six KEMAS faces competition from pre-schools.

Regarding Item 050090 - Maintenance and Repair of Buildings of the Community Development Department (KEMAS). Like many other Honourable Members, we know that several of these KEMAS buildings are dilapidated. If a school is a dilapidated school, so is the KEMAS building. Has KEMAS carried out a study? I am sure it has, on the dilapidated buildings, and what is the plan? Is the RM9.5 million enough to repair and maintain KEMAS buildings? Next, MRSM in particular, the maintenance under Item 00602 - Maktab Rendah/Kolej Sains MARA. The allocation of RM27 million, we hope, will be enough to maintain the schools, and we hope this allocation will be increased further because, if the schools are not maintained properly, then one day we will face problems, perhaps buildings will collapse, for example, if the maintenance allocation is insufficient. Next, regarding water supply, the Honourable Deputy Minister is aware that he has already been to Jeli and to several other areas. We need alternative water and rural water supply, and I hope special attention will be given, because in Kelantan, especially in Jeli, Air Kelantan is unable to solve the water problem, but there are gravity water sources, hill water, and also water from underground, and we hope the allocation is sufficient to help rural areas. Finally, Mr Chairman, I suggest that this may be more relevant to the Ministry of Finance. This is because some of these Items are too general. That is why we ask whether there is an allocation for our area, our state. For example, village street lights: we do not know how many thousands there are, so there are not many questions in this Parliament. For example, regarding allocations for states, if every ministry at this end has allocations for states. Previously there were allegations that certain states had no allocations, when in fact there were quite a lot. So, we hope that in presenting this book, you will be a little more detailed, for example, how many kilometres of roads, and where, roughly, even if not across the whole country, perhaps in Peninsular Malaysia, Sabah and Sarawak, how many street lights there are. And also, in connection with all this, for example Item 030200 - Community Welfare Development, I think, RM280 million. Are these, for example, houses for the poor? So we must describe this object accurately. So if it is general, we are left wondering here, which wastes time. So if it is stated precisely that this is building houses for the poor, then we will not have so many questions. So those are some of the general points, and I hope the government will take note. This book needs to be presented to Members of Parliament and needs to be detailed a little. We understand that if it is too detailed, the book will be thick. However, I am confident this view can be taken into account so that we do not raise too many questions. Thank you, Mr Chairman.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Jeli. Now I invite the Honourable Parit Sulong. I will call afterwards the Honourable Hulu Terengganu, the Honourable Pasir Mas, the Honourable Putatan, then the Honourable Sibuti and the Honourable Rasah.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Thank you, Mr Chairman. I will go straight to Item 00611 - GIATMARA Programme. My question to the ministry is, does the ministry intend to add courses offered at GIATMARA centres? I will give an example: in Johor there are 26 GIATMARA centres, and one of them is located in the Parit Sulong Parliamentary constituency. In Parit Sulong, only three course clusters are offered compared with the 12 course clusters available overall. So, my question to MARA is, does MARA have any intention to increase the number of courses offered so that the local community has more choices? In Parit Sulong, the course clusters offered only cover the computer and technology cluster, the electronics cluster and the transport cluster. So I feel the ministry should increase the number of courses offered, for example perhaps the culinary cluster, whose offering may be very suitable considering that the Parit Sulong Parliamentary constituency is an area well known for SMIs.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Then I also want to propose that the early childhood education course under the hospitality cluster be expanded to all existing GIATMARA centres, because it is a necessity in the country today to provide more education on early childhood education and training. This is because I found that the early childhood education course is only offered at one GIATMARA centre, namely in Petaling Jaya. So, is there any proposal to expand this course? This is because one day we will still have a major shortage of registered caregivers at centres, so the demand for this course will certainly be very urgent. Item 040300 - Community Development (KEMAS). So far my question is, what reforms have been implemented on KEMAS Tadika so that this government-run kindergarten can be seen to be able to compete with the flood of private tabika that are sprouting like mushrooms after the rain. So, the feedback I received from my parents is that KEMAS Tadika is still far behind when compared with the private kindergartens available, such as Real Kids, Smart Reader, Little Caliph, Brainy Bunch, and all these kindergartens use the phonics method to teach children to read, whereas Tabika KEMAS still uses the old system, namely the spelling method. So, I want to cite a case study from a journal published by Professor Diane, author of the book Why Our Children Can't Read, and Dr Robert Logan, author of the book The Alphabet Effect. They state that the spelling method is no longer relevant to teach children today, and children who learn to read through the phonics method have been proven to master reading skills faster than through the spelling method.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Therefore, my question to the ministry is, why does TABIKA KEMAS still use this old method? Will TABIKA KEMAS change the learning system in KEMAS tadika? Item 040100 – Rural Development Institute (INFRA). Does the ministry have plans to open INFRA branches in every state? At present, I see there are only three INFRA branches. In Peninsular Malaysia there is one in Kajang, one in Sabah and one in Sarawak. I want to propose that the ministry open INFRA branches in every state, because I see that many facilities provided by INFRA may be usable for the economic development of local communities. Item 050400 – Operating and Maintenance Costs of Village Street Lights. On this item, I want to raise the issue of village street lights in the Parit Sulong Parliamentary constituency. The Parit Sulong Parliamentary constituency has six mukims, and it has a network of 220 villages, but its street lights are indeed irregular, there are still some that need- because the roads are too long and there are definitely not enough lights. So, I want to give examples such as Kampung Sri Wangi, Kampung Parit Karjan, Kampung Pedada Kuning, Kampung Sri Jasa right up to Bukit Sri Wangi, which are very dark. Sometimes the risk is when we have to collide with pigs that wander about in the middle of the night...

[Speaking without using the loudspeaker]

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Ha, with him. Him with him. [Laughter] So, I ask that additional street lights be provided in the Parit Sulong Parliamentary constituency. There have even been accidents, cases ending up in the emergency room and everything. Next, to Item 030100 – Rural Entrepreneur Development. I have noticed that the allocation for this item, since Pakatan Harapan took over the government, has been decreasing. For example, in the last Budget 2019, the government cut the Rural Entrepreneur Development budget from RM2.4 million to RM2 million. This year, Budget 2020, once again the government cut from RM2 million last year to RM1.6 million for the whole country. In my view, this amount is very small compared with the Parliamentary constituencies. For example, the people in my area are very dependent on village industries. In fact, various assistance must be channelled down by us, from the government.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

So, my question to the Minister is why there is a reduction in terms of this allocation? What allocation, then, is set aside for the Parit Sulong Parliamentary constituency in terms of this rural entrepreneur development? That is all, and I hope what I have raised receives feedback from the ministry, and I hope the Honourable Deputy Minister can answer the questions I have raised. Thank you very much, Honourable Mr Chairman.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Parit Sulong. Now I invite the Honourable Hulu Terengganu.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman, for giving me the opportunity and chance to debate under the Committee of the Ministry of Rural Development. Honourable Mr Chairman, I will go straight to Supply Purpose 22, Item 020500, together with Development Purpose 22, Item 03800 - KETENGAH. Honourable Mr Chairman, in Hulu Terengganu, the largest water catchment area is Tasik Kenyir, which lies within the KETENGAH area. What has happened in the Tasik Kenyir area is that there is a hotel that is being built. My question: up to today, what is the status of the construction of the hotel built by Syarikat Bina Puri up to now? I understand it is in a state of being ill. Then, within the Tasik Kenyir area there is also a water theme park that operated for, I think, less than a year, and today it has been closed. My question is, why was it closed? When will it operate again? This is because this water theme park was an attraction for tourists to Tasik Kenyir. Then at Tasik Kenyir there are also a bird park, a butterfly park, an orchid park and a herbal park, which I understand are in a state of being alive but reluctant to die. So, explanation is needed from the ministry: why did this happen, and what actions can be taken to revive these projects, which I understand cost millions of Ringgit? Apart from that, Mr Chairman, under this Head there is also a customs housing estate containing approximately 72 units, all of which are already completed but are like a white elephant project. So, what action will the ministry take to utilise these buildings so they do not remain abandoned? This is because they are all completed. So, I appeal to the government to look at or find a way to use or fill these houses, which I understand, up to today, only five units are being used. Next, also at Tasik Kenyir, there is a project, a duty-free island at Pulau Bayas, which seems to have been abandoned, and it cost more than RM300 million. However, the question is, what is the ministry's plan to continue the project that has been built? Will it stop there? Or what other plans are there? The duty-free shops currently operating are only under one canopy, and their condition is also alive but reluctant to die. Mr Chairman, I move to Development Purpose 22, namely Item 00602 – Maktab Rendah/Kolej Sains MARA. What I want to question here is MRSM Ketengah, which I understand has already been closed. Why was it closed? What action will the ministry take to relocate the students who were studying there, and what was the cause of the closure? Finally, Mr Chairman, Supply Purpose P.22 Item 02001, namely rural water supply. In the Hulu Terengganu area, there are still 22 villages consisting of 600 families who still do not have adequate water supply.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

The villages are Kampung Pelam, Kampung Paya Dadih, Kampung Tanjung Baru, Kampung Gerdung, Kampung Binjai Kertas, Kampung Matang, and many more comprising 22 villages. So, we hope that with the allocation, even though it has been reduced from RM207.8 million to RM111 million, these villages will not be neglected. This is because, in keeping with Hulu Terengganu being a rural area and in line with the name of this ministry, I hope the ministry can give special attention to development, especially in supplying water to these rural areas. That is all, Mr Chairman. Thank you.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, Honourable Hulu Terengganu. Now I invite the Honourable Pasir Mas. Please proceed.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I will go straight to Item 051200 – Allowance for the Village Community Management Council (MPKK). I want to question why the ministry introduced the Federal Village Community Management Council (MPKKP) in 2020? Yet the MPKK in the state of Kelantan and in opposition-led states in particular has already been running very well. In fact, the statement regarding this MPKKP has already been issued at party level. In Kelantan, by Pakatan Harapan Kelantan. So, I feel it is rather improper that a statement of a government administrative nature is issued by a party first, and uses the excuse as if this MPKK is used for political purposes. Whereas this MPKK has already been operating very well in these opposition states. So, when the MPKKP is established, where the allowance from the government is paid only to MPKKP, I predict that a new controversy will arise at the level of the states administered by the opposition. So, the best course for the opposition states, I propose that this MPKK simply be maintained as it is administered today, and there is no need to create a government within a government. This is because in the past, Pakatan Harapan often, when campaigning, we often criticised the acts or activities of creating a government within a government. When this MPKKP is established, it will certainly become a government within a government in a new form.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Item 020600 – South Kelantan Development Authority (KESEDAR). I request the Honourable Minister to state the form of an Islamic-oriented approach in the management, planning and implementation involving KESEDAR, as has been stated in the KESEDAR Roadmap 2014-2030. I request the Honourable Minister to state the status and performance of the key Kelantan economic project initiatives, especially involving the medium-term phase 2016-2020, and their impact on the community. Item 030300 – Council of Trust for the Indigenous People (MARA). I request the Honourable Minister to state the position regarding the memorandum of understanding between MARA Corporation Sdn. Berhad, MARA Corp and Lynas Malaysia Sdn. Bhd. to establish cooperation in several key projects including attracting downstream industries and customers to Malaysia. Is it true that the MOU between MARA Corp. and Lynas was made without the approval of the MARA council? Item 02300 – Rural Roads. The allocation for 2020 is RM880.6 million compared with 2019, RM787.1 million. I want to know how much allocation has been given to the state of Kelantan and especially my Parliament in Pasir Mas. This is because I am often approached by various parties to approve allocations for building roads, and the RM100 thousand for opposition Members of Parliament is certainly not enough to approve rural roads. So I want to know how much allocation has already been distributed in 2019 to the state of Kelantan under these rural roads, especially in the Pasir Mas Parliamentary constituency, because we are not treated the same as Pakatan Harapan Members of Parliament.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Yesterday I heard from the Honourable Member for Segamat that the Honourable Member for Kota Melaka could approve allocations of hundreds of thousands, but we could only see the application letters without being able to do anything. This is because we did not know what rural roads and allocations came to our Parliament. Item 00400 – Early Childhood Education. I welcome the increase of RM6.68 million in 2020 compared with RM2.055 million in 2019. However, I would like to raise a question. In 2018 the expenditure was only RM99 thousand. Less than RM1,000 from RM100 thousand. What exactly is under this expenditure of only RM99,000 in 2018. If it relates to the curriculum of KEMAS kindergartens, I would like to repeat what the Honourable Member for Parit Sulong said earlier, that is whether there has been no study of the education syllabus of KEMAS kindergartens, a review so that it can compete, sit on the same level and stand on the same height as other private kindergartens. So we do not want this educational institution to receive attacks like primary schools that were attacked with the distribution of deviant comics, banned comics. We can see that this agenda is the agenda of certain parties to attack educational institutions and we do not want children at KEMAS kindergarten level to also receive the same attacks. Therefore, a syllabus that is more oriented towards unity, teaching them to form unity and also teaching them how to interact. Today the challenges of smartphones and so on are very many in the growth of children. So in the teaching and learning process in shaping the development of a student at this KEMAS kindergarten, we want this syllabus to be more oriented towards how to build social skills for interacting with other people. Next, Item 030100 – Rural Entrepreneur Development. Why did it drop from RM24.04 million in 2019 to RM1.68 million in 2020? A drop of almost half a million. Is this amount sufficient to develop rural entrepreneurs throughout the country? I want to know how much of the 2019 allocation that dropped went to opposition states, especially Kelantan. In fact, the rural entrepreneur allocation should empower rural entrepreneurs more, as mentioned earlier by the Honourable Member for Kangar. How about migration from the village to the city. I see that it is not impossible for us to create a scenario where urban youths return to the villages. This is because, to generate income, to generate earnings in the villages is already sufficient. If we have land of about two acres, for example, we can use it for fertigation crops and so on. In Pasir Mas, for example, if the Honourable Minister wants the most delicious budu in Kelantan, it is in Pasir Mas. Likewise, it is well known for the manufacturing of weapons, parang and so on. Youths in Pasir Mas have once been champions internationally in weapon craftsmanship. Likewise with other projects or enterprises, keropok and also sambal daging, or what is called serunding, are also available. So, I see that if we empower these activities, it is not impossible that someday we can create a scenario where urban youths return to the villages. Next, MARA Junior Science College (Maktab Rendah Sains MARA, MRSM), Item 00602. I want to know how many MRSM Ulul Albab there are and how many huffaz who have graduated after memorising the Quran have been produced by MRSM Ulul Albab, which I see is a very good curriculum in forming huffaz who can have knowledge that interacts with contemporary knowledge and also memorise the Quran at the same time. I want that data. Thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Pasir Mas. Now I invite the Honourable Member for Putatan. He has asked to begin with five minutes.

Thank you, Mr Chairman. I go straight to Item 00611 – GIATMARA Programme. Here we see there is RM24,500,000. For the information of the Honourable Minister, in my area there is a GIATMARA centre building that still rents a village hall in the kampung, in the middle of a housing estate. So I request that the ministry assess my application so that a GIATMARA centre can be established. I can provide land through the district council. For the information of the Honourable Deputy Minister, one of the students from the GIATMARA centre in my area has made a name, bringing honour to Malaysia when he became champion in air-conditioning engineering in Europe in 2014, from my area, P.173 – Putatan. I request to obtain a new building. Second, I want to speak about public welfare, but here there is only RM2 million. This is because in my area I face a problem, perhaps in Malaysia only Putatan faces such a problem. Why? In the Putatan Parliamentary constituency there are three flood mitigation projects under construction. All of them are within RM50 million across the villages. So I can attach it later when I meet the Honourable Deputy Minister. My village, this area too, is traversed by the Pan Borneo. So there are four major projects passing through the small Putatan area. So the existing PPRT area, the PPR area provided, 500 units, cannot accommodate the village residents involved in the eviction because of these four mega projects. So I have discussed with the district office, the district office is ready although my place is in the city, land is very expensive, but the district office is ready to provide a plot of land for the PPRT cluster programme. We will apply for as much as possible so that we can house the residents in my area who are involved in the eviction because of this project. That is what I request. Third, I need the attention of the Honourable Deputy Minister on contractor-driven projects. Referring to Item 02300 – Rural Roads worth RM880 million. Honourable Deputy Minister, recently I faced a problem where an allocation of a project came down to the district office without my knowledge, but was applied for through the correct procedure. The problem is, this is what we call a contractor-driven project. This proposal did not go through the Member of Parliament. So what happened is that the approved project is not benefiting the people. The hanging bridge that is about to collapse needed to be built, but what was built was a bridge that needed painting. So the road that needed to be built to benefit 500 residents was instead built as a road that is merely patched for 50 residents, because this is what we call a contractor-driven project.

I request that the ministry in future, for Federal projects whether village roads or PPRT, we know the procedure goes through the district office, but there must be confirmation from the Parliamentary people's representative. That is very important because we are the ones who face the people.

Papar. Papar would like to ask for an intervention.

Yes, please. Please.

Yes, in Papar too there are problems like those the Honourable Member for Putatan– the problems in Putatan. So I want the ministry to take a good solution so that Members of Parliament who apply for those works know that these projects have been approved. What happens is that when approval exists but we Members of Parliament know nothing of what is actually happening. So, such matters, if one thinks about it, are sometimes not good for development in our places. Thank you.

That is all. I request the speech of the Honourable Member for Papar...

The Honourable Member for Putatan, the Honourable Member for Putatan. Like the Honourable Member for Papar just now, I also ask that in matters like this we Members of Parliament, as people's representatives in the area, also be informed about these matters and asked for confirmation from us so that problems do not arise, so that the projects that come really meet the needs of the people in our areas.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Putatan.

I request that the speeches of both from Papar and Beaufort be included in my application. That is all, I support.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Putatan. Now I invite the Honourable Member for Sibuti, followed by the Honourable Member for Rasah, then the Honourable Member for Kota Tinggi, then the Honourable Member for Tenom.

Thank you, Mr Chairman. I go straight to Item 050500 – Rural Basic Infrastructure, where we see an increase from RM14 million to RM35 million. I would like to know the details, what can be obtained for rural basic infrastructure for the state of Sarawak and especially for the Sibuti Parliamentary constituency? What forms of projects can be channelled into this rural basic infrastructure? I also go straight to P.22, namely 01700/01702 – Rural Electricity Supply/Sarawak, where the government continues the allocation for rural electricity supply projects. I want to get the details for the Sibuti Parliamentary constituency, considering that in the Sibuti Parliamentary constituency there is more focus on the last mile activity, namely connecting electricity to longhouses and villages that have not yet been included in the project. I also want to know what is the policy of the ministry for projects for new longhouses or longhouses that have split to establish a new longhouse? Are they eligible to obtain rural electricity supply projects? Considering that the area already has a grid or has been handed over to Sarawak Energy Berhad. I also want to get the details for Item 02000 – Rural Water Supply. Where there are many applications and also the Sarawak State Government is carrying out rural water supply activities. What are the cooperative measures carried out by KPLB and also by JBALB in Sarawak? I also want to know what is the status of the applications of residents in Kampung Tukau Jaya in the DUN Lambir area, that is the Sibuti Parliamentary constituency, whether they have sent applications to the ministry. Apart from that, what are the measures of the ministry concerned regarding rural electricity supply and also rural water supply? When can the government release complete data? What percentage more of electricity and water projects are needed by the state of Sarawak? I also go straight to Item 01707 – New Installation of Village Street Lights. I want to get the details, how much has been obtained for the state of Sarawak? Can these projects be applied for by the Sibuti Parliamentary constituency, especially for the roads leading into villages and also longhouses? I also want to go to Item 03200 – Community Welfare Development Scheme. Where there is a large allocation of RM280 million. In this scheme I also learned that PPRT house projects and repairs are included in this RM280 million. I want to propose to the government, I have received an answer from the Minister that in 2018 only two PPRT units were built in the Sibuti Parliamentary constituency.

I also do not know how my friends in the government, how much quota is given to each Parliamentary constituency? Does the government have a proposal or plan so that this PPRT programme can also be applied for by longhouse residents and also for the repair of longhouses? This is important considering that the structure of these houses is not like houses in the villages. Where if we only repair one door of a longhouse, this will affect the residents or neighbours in that longhouse. So, I am of the view that the ministry should formulate an idea or a plan to help the scheme of repairing longhouses and also enable these dilapidated longhouses to be built through the PPRT Programme. Apart from that, I want to touch on Item 051100 – Equipment and Fittings for KEMAS Nursery/Kindergarten. Although there was a change of government, we still built KEMAS kindergartens to ensure the early childhood education of our children is guaranteed. In the Sibuti Parliamentary constituency, I think there are nearly five new KEMAS kindergartens. However, we need cooperation with the ministry to complete the equipment, and it is also not fair for us to build a kindergarten, complete the kindergarten, and in the end, if we use the method used by the Minister of Education, state that what we built is a gift from the Federal Government. This is unfair. It is better for us to cooperate, we build, whether the ministry builds KEMAS kindergartens, we provide equipment, or the existing KEMAS kindergartens are completed, the government or KEMAS can be given complete equipment for the development of these early-phase children. I think that is all, Mr Chairman. I thank you for being given the opportunity.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Sibuti. Now I invite the Honourable Member for Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Chairman, for the opportunity given. My friends think Rasah is only an urban area, but in fact part of it is rural, Mr Chairman. Therefore, for the Honourable Deputy Minister, I have 24 MPKK under the Rasah Parliamentary constituency, far more than Ipoh Timur, more than Taiping. Therefore, the first thing I want to mention is Item 051200 – Village Community Management Council (MPKK) Allowance. Mr Chairman, I see there is a slight reduction. Last year, at the 2019 Budget level, there was RM231 million allocated for this item, but this time it is reduced by RM10 million to only RM221 million. Under 40000 – Fixed Payments and Charges. The title is allowance. I want to ask, is this indeed the allowance for the Chairman and Secretary of the MPKK, namely the fixed allowance which, if I am not mistaken, is RM500 and RM300 respectively, and also the meeting allowance for the 11 committee members only, or does it include the RM10 thousand grant that is given? Because I myself, I see that apart from Item 051200 – Village Community Management Council (MPKK) Allowance, I do not see any other item in this book, whether under the meaning of Supply or the meaning of Development for the Ministry of Rural Development, regarding the RM10 thousand that this year has been distributed to MPKK after applications, with each submitting a programme proposal paper in their respective kampung areas. I do not see that matter. For me, that grant is important because that grant is what will bring MPKK to life, what enables MPKK to become an important grassroots committee, especially in states like my place in Negeri Sembilan, which can convey information or all programmes from the government quickly and accurately to the community at the grassroots, especially in the villages. It is very important. Because in my own area there are 24 villages, 24 MPKK under the Ministry of Rural Development. So, I request an explanation and I request, if possible, that the RM10 thousand grant, which in 2019 was RM10 thousand, next year there should be an increase.

Tuan Cha Kee ChinDAP · PHRasahEN

If not RM20 thousand, at least RM15,000, there should be an increase so that there are more, and more lively, various programmes planned at village level. So, I request an explanation from the Honourable Deputy Minister. The second thing I want to mention regarding MPKK is also how about the allocation for improving infrastructure at village level. When we talk about development, we want development that is equitable, especially for rural areas. As we know, it lags behind urban areas. Therefore, work to upgrade or improve infrastructure at village level is very important. Whether roads, drains, or village halls, these are among the essentials. For the information of this august House, I myself have allocated from my PMR allocation to repair, if I am not mistaken, 13 or 14 village halls operated by MPKK this year. So, I hope that if next year it can be directly obtained from the ministry, then my allocation as a Member of Parliament can be used for other purposes for the benefit of the local community. The second point, under Item 02001, under the heading Rural Water Supply, Peninsular. I see RM111 million allocated. I want to ask how this allocation is distributed, whether it is distributed to each District Office or directly to MPKK or KEMAS or any agency involved in the distribution of such allocation in the Peninsula. Because in my area, I mention the name of the village, Kampung Lambar, there are some residents who still have not received clean water supply because there is no pipeline to channel clean water to their respective houses. So, I request attention to this matter. Last point...

[Speaking without using the microphone]

Tuan Cha Kee ChinDAP · PHRasahEN

Kampung Lambar, yes, the one with MPKK. Okay. Next, the last one under Item 02300 – Rural Roads. I see RM880 million allocated under this heading. So, I would like to ask- how to apply if MPKK wants to make an application to repair rural roads. This is because I see many villages facing problems that need to benefit from this large allocation- which agency is responsible and the method of application. Whether it applies directly to the Development Office in each state or to the respective district office. That is all my question, thank you Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Rasah. Now I invite the Honourable Kota Tinggi.

Thank you, Mr Chairman. I have several matters I wish to raise, and some of the matters I wish to raise, the Honourable Minister already raised last year. So, I hope that in this 2020 Budget there will be good news. If not, I will have to bring it up again next year, and I will have to bring it up again next year. That is, provided the Pakatan Harapan Government is still in place. If the Pakatan Harapan Government is no longer there, I would not need to raise it again because the BN Government will do it. Mr Chairman, referring to Item 02403 – Integrated Area Development Programme. I have already raised this with the Honourable Deputy Minister regarding this application, namely that previously I requested 80 units, but I also discussed with the Honourable Minister at that time, who said that the ministry had no allocation. So, this time I would like to apply for only 20 units of PPRT houses in Taman Sinar on land area of 10 acres. The District Office has also built six units 10 years ago.

This is because we know that the allocation for PPRT housing comes from the KPLB allocation. So, if the Honourable Deputy Minister can help me, as a result of last year's problem, build only 20 PPRT houses, that is the first. Second, this I have also raised before, rebuild the Jabatan Kampung Teluk Tanjung Sedili bridge which connects five villages, Kampung Semayung Perepat, Teluk Padang, with a population of 3,745. Honourable Deputy Minister, this bridge is just waiting to collapse. It is already cracked, already broken, just waiting to collapse. So, I hope it does not cause problems. Building this bridge is not very expensive, just slightly under RM3 million. So, I hope it can be completed next year. I have also raised this matter last year. Under Item 02000 – Rural Water Supply, Item 02001 - Peninsula. I request a new water supply at Kampung Baru Batu 15 Jalan Mersing, Kota Tinggi. This village has no water at all, the same as Rasah. I also pity Rasah, and they take their water from the river. I ask the Honourable Deputy Minister to resolve the matter I raised last year for next year's Budget. For this matter too, I have also applied under Item 01701 – Peninsula, Item 01700 – Rural Electricity Supply. There are 10 villages, and I have already sent a letter to the Honourable Minister on 17 March 2019. I think I need not mention the list of villages, I ask the Honourable Minister to please refer back to the letter I have sent to the Honourable KPLB Minister. Next, Mr Chairman, Item 020800 – Southeast Johor Development Authority (KEJORA). KEJORA has built, Honourable Deputy Minister, 177 house lots in Bandar Perani. It built 100 units, then in 1986 built another 43 units in 1987, and there remain 34 units. So, perhaps the Honourable Deputy Minister can complete the remaining 34 for the children in the Bandar Perani area. Finally, Mr Chairman, under Item 02400 – Village Connectivity Roads. I request that a new Jalan Sepakat be built from Kampung Singapura to Taman Sinar, a new road at Kampung Sedili Kecil, and there are nine villages whose roads need to be upgraded. The main roads of Kampung Padang, Kampung Simpang, Kampung Seri Paya, Kampung Teluk, Jalan Muafakat, Kampung Singapura, Kampung Mawai, Kampung Jalan Bahagia, Kampung Singapura again, Jalan Senangin, Kampung Sedili Kecil and Kampung Sayang. So, I hope that hopefully the Honourable Deputy Minister can give me an extraordinary answer after I have constantly raised it since last year. Thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Kota Tinggi. Now I invite the Honourable Tenom, followed by the Honourable Setiu, then the Honourable Lembah Pantai, then the Honourable Hulu Rajang and then the Honourable Papar. Please.

Puan Noorita binti SualDAP · PHTenomEN

Thank you, Mr Chairman. In my debate I will mention several items, namely Item 050500 – Operating and Maintenance Costs of Village Street Lights, Item 01700 – Rural Electricity Supply in Sabah, Item 02003 – Rural Water Supply in Sabah, Item 02300 – Rural Roads together with Item 02400 – Village Connectivity Roads. Mr Chairman, I thank the government because Sabah usually receives the highest allocation in rural areas, especially involving electricity supply, clean water supply, and village and kampung connectivity roads. However, what I want to emphasise here is that the parliamentary area, with an area as large as 2,238 square kilometres, still has many needs, basic infrastructure facilities that need to be built, repaired and given attention. For the information of the House, based on information from SSB, there are still about 603 villages with an estimated 19,761 houses across the whole state of Sabah that still do not have electricity supply. I am informed that there are still about 36 villages involving 774 houses that still do not have electricity supply within Tenom District itself.

Puan Noorita binti SualDAP · PHTenomEN

I would like to ask the ministry, through the allocation of RM216 million for rural electricity supply in Sabah in the 2020 Budget, how much has been channelled to the Tenom parliamentary area. Interior residents have the right to the best basic facilities so that they do not feel marginalised, although village residents can use generators, kerosene, candles and so on, but I ask that this matter be given serious attention. Mr Chairman, besides electricity supply, the need for water supply is also very urgent in my parliamentary area. In the 2020 Budget, rural water supply in Sabah was allocated RM350 million compared with RM295 million in the 2019 Budget. The allocation has increased and I hope that development programmes and projects for upgrading and new projects for water supply in Tenom must be implemented immediately. As in Pekan Kemabung, Tenom, imagine, with an area covering 1,182 square kilometres involving 109 villages in five mukims, there is only one water treatment plant, namely the Kemabong Water Plant.

Puan Noorita binti SualDAP · PHTenomEN

This plant at present cannot cope with the need for treated water supply across the whole Pekan Kemabong area because of insufficient capacity and water pressure, and water supply often gets cut off, especially in Kampung Pal, Kampung Cinta Mata, Kampung Kenaboi, Kampung Saga, Kampung Monotomon and many other villages involved. So, I would like to propose that the ministry can add water treatment plants in the Tenom parliamentary area, especially in the small district area of Kemabong. I also want to ask the ministry what is the status of the Senagang Water Plant upgrading project up to today. Is it still going ahead? Mr Chairman, I also want to touch on village roads. There are still many areas in Tenom District whose roads are gravel and laterite. I hope that through the RM120 million allocation under village connectivity roads and rural roads, it can also be channelled to the Tenom parliamentary area. Tenom also has several tourist areas, and indeed I want to propose that rural road allocations also be channelled to the category of rural tourism roads that will be established and are being developed in the state of Sabah, including within Tenom district. If possible, this allocation can maintain or upgrade roads to rural tourist areas. Such planning is important because most roads connecting tourism centres run by rural communities will further improve the local socioeconomic status. So far, we are well aware of road categories such as agricultural roads, council roads and village roads, but there are no rural or village tourism roads. So, I request that the government consider this matter with the existing allocation because such an initiative is a good idea in helping local people. Finally, under Item 05000 – Sabah Land Development Board. I would once again like to ask the ministry whether the application for infrastructure development funds by SLDB for the coffee planting project in Kampung Kabintaluan, Tenom, is included in the ministry's expenditure estimates in the 2020 Budget. I ask that the ministry pay attention to this matter because this project is expected to help at least 602 households and subsequently resolve the shortage of coffee bean supply currently faced by coffee traders in Tenom district in the future. That is all, thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Tenom. Now I invite the Honourable Setiu. After that, the Honourable Lembah Pantai.

Assalamualaikum warahmatullahi wabarakatuh. Mr Chairman, I go to Item 00602 – (MRSM) Maktab Rendah Sains MARA. So I request that one MRSM be built in Setiu, considering that Setiu does not yet have this MRSM.

Second, Item 02300 – Rural Roads. There are still many rural road problems that are troubling the people of Setiu. I will mention several examples. One narrow road from Kampung Banggol Setor to the Sungai Tong national pineapple plantation, where this road becomes an alternative road for several villages when flooding occurs. Third, the dilapidated bridge from Kampung Ladang Fikri to Kampung Pak Ba, which bridge was found to be already cracked and there is concern it will collapse and fall down if it is not repaired immediately. Fourth, the road to the RTB Bukit Gerebar resettlement area in the Permaisuri State Constituency, where signboards have been erected since 2017 but it has not yet been built up to now. Fifth, the flood bypass road to Kampung Bukit as an alternative road for village residents during the flood season. Sixth, Tok Nandung Bridge, which I have already mentioned in the budget debate last year, namely a narrow and small bridge that often submerges during the flood season. So I hope this bridge project must be built immediately because residents often get trapped during the flood season. They have no other bridge except this one. To further boost the economic activity of Setiu residents, before the general election (PRU) it was once proposed to build a road from Kampung Banggol to Kampung Bukit Kecil, but up to now there has been no development on whether this road project will proceed or not. I seek the explanation of the Honourable Minister. Next, Item 051200 – MPKK Allowance. In 2019, an allocation of RM231 million, in 2020 RM221.8 million. My question is, what is the justification for the proposed establishment of MPKKP in Terengganu when the Cabinet meeting on 27 June 2018 decided that MPKK falls under the jurisdiction of the state government. On 1 July 2018, Terengganu was the first state to complete the appointment of MPKK. Recently the Menteri Besar of Terengganu agreed to the proposal from KPLB or the Ministry of Rural Development to appoint five AJKs from among Pakatan Harapan members to sit on MPKK in every village, but up to now they still have not submitted those names. That means Terengganu follows the procedure and conditions and any request from KPLB. However, at the same time, as announced recently, the government will also continue to establish this MPKKP. With the establishment of this MPKKP, will the allowances for the four highest MPKK positions and other allowances no longer be channelled to MPKK? Is the government aware that the establishment of this MPKKP disrupts the harmony of society and the village? Will the RM10 thousand grant no longer be channelled to MPKK when this MPKKP is established? Next, Item 02008 – Rural Water Supply. The rural water issue still has not been resolved. There are still many places in interior areas, especially in Setiu, that still use underground water wells because there is no main pipe installation in their areas. Finally, Mr Chairman, Item 00500 – Community Activity Centre. There are still MPKK that do not have a village hall facility. There are village halls but they are dilapidated and they do not have equipment such as laptops, computers and others. Some village halls were built on privately owned land and need to be acquired by repossession. Some village halls are used for KEMAS Kindergarten. One more thing, Mr Chairman, Item 01707 – New Installation of Village Street Lights. There are still many villages without street lights. I hope that locations at bends classified as dangerous bends, deadly bends that may lead to accidents must be given priority in the installation of these new street lights. That is all, Mr Chairman, aquluqauli haza astaghfirullahal azim liwalakum. Wassalamualaikum warahmatullah wabarakatuh.

Deputy Speaker (Mr Nga Kor Ming)EN

Thank you, Honourable Setiu. Now I invite the Honourable Lembah Pantai. After that, the Honourable Hulu Rajang.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Thank you, Mr Chairman. I would like to also join in on Supply 22, Item 030300 – Council of Trust for the Indigenous People (MARA), specifically regarding business premises owned by MARA. My proposal for the Honourable Minister to give consideration is because in Kuala Lumpur there are also many rural folk who have migrated to Kuala Lumpur to seek better opportunities. If there were more business premises owned by MARA that could be operated, such as the one that is helped, for example Rosyam Mart, where I understand the rent given is quite low, and if there were several more business premises within the Kuala Lumpur area including in the Lembah Pantai area, perhaps more rural folk who have migrated to Kuala Lumpur could be helped. I would like to touch on Item 050900 – Maintenance and Repair of KEMAS Buildings as well as Item 051100 – Equipment and Facilities for KEMAS Tabika/Taska. I see that many- quite a number of premises for KEMAS Tabika and Taska are not only in the Lembah Pantai area but in many areas of the PPR housing estates throughout the Federal Territory of Kuala Lumpur, in various conditions. Some are good, some are less so, under the stilts, and many have problems.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

I visited one area, the PPR Sri Pantai, for example, where there are walkways, and it has, for example, pipes under the floor. If there is a leak, all sorts of things come down, yes, things fall onto the heads of the children. We do not want this to happen. I ask for consideration to help repair whatever should be repaired, especially in the PPR areas. I see that the Honourable Minister is responsible for Item 00400 – Early Childhood Education. I understand that many of the children who come out of the Tabika KEMAS programme have, with permission, yes, a very high literacy rate. In Lembah Pantai, I understand that out of roughly 300 who come out each year, the literacy rate is almost 97 per cent. Unfortunately, somehow, something gets lost when they enter Standard 1, Standard 2 and so on; their literacy rate drops. I am not sure why. Perhaps if there were a programme that could help, so that the achievements reached at the Tabika level are not lost when they enter primary school. Perhaps this can be considered between the ministry and other parties. I received a view from one of our friends in this House regarding Development Purpose 22, Item 00602 – MARA Junior Science College/MARA Science College. Although at this time I am perhaps not sure whether there is a policy that is specifically devoted to or prioritises children from rural areas. If so, I ask the Honourable Minister and also the ministry to consider that urban children, especially from the B40 group as I mentioned earlier, many of whom have migrated to Kuala Lumpur, should not be sidelined in their opportunity to enter MRSM, if indeed such a change has occurred. I wish to touch on Item 01700 – Rural Electricity Supply and Item 02000 – Rural Water Supply. I understand from the Honourable Minister that the large expenditure, if added together, is almost RM1.3 billion. I ask for views on whether this amount, how can be stretch the rakyat seringgit in these projects, given that we are now about to enter 2020 yet we are still talking about rural electricity supply and we are still talking about rural water supply. Is the way we implement these projects problematic, and can a different approach be pursued? For example, if one of the problems is in terms of contracts and the JKR, for instance. Can we reduce the profit margin costs so that we can ensure more can be built to benefit more houses in rural areas, so that the people's money is spent more prudently. That is all for now, thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Member for Lembah Pantai. The Honourable Member for Hulu Rajang, followed by the Honourable Member for Papar.

Datuk Ugak anak KumbongPRS · GPSHulu RajangEN

Thank you, Mr Chairman. I go straight to Item 02300 – Rural Roads. As a rural Member of Parliament, and most of those present today, this afternoon, I think, are from rural areas, I go straight to the point. I ask the ministry to build a road from Nanga Mujong to Nanga Gat, which is the area of my longhouse, Honourable Deputy Minister. Recently I raised Jalan Tegulang, Jalan Metalun and Jalan Rumah Juntan in Sungai Sut, so that, if possible, the ministry reviews them again and increases the allocation to build those roads. Apart from that, I now turn to the matter of human capital development, and I hope that if the ministry can build one MARA Skills Institute (IKM) for the population of the Hulu Rajang Parliamentary constituency, and Item 00604, one in Asap if possible, and a second in the district of Bukit Mabong, Mr Chairman. Mr Chairman, apart from that, I also wish to refer to Item 040300 – Community Development (KEMAS) and Item 05900 – Maintenance and Repair of KEMAS Buildings. For the information of Mr Chairman and also the Ministry of Rural Development, the KEMAS offices in villages in Hulu Rajang are very pitiful. Indeed, their offices are in small spaces and even under longhouses now. We are using allocations from our service centre. Apart from that, Honourable Deputy Minister, we know that if the situation, the conditions, are not very good, KEMAS officers also do not function well, and the places where they work and carry out activities for the community are also not conducive. So it is even more saddening that the allowance for community development assistants, namely assistants, teachers or KEMAS kindergartens, is only RM500 a month. So they have been asked to tell the ministry and WhatsApp me. So these people are among those responsible for educating the nation's future generation, and their allowance is very, very low, Honourable Minister. So it is pitiful to see them get up early in the morning, educate the children, return late, and only receive a minimum wage of RM500 a month. This is very unfair. So I ask, I hope their salaries can be raised to the current minimum wage level. Therefore. Thank you, Mr Chairman.

Deputy Speaker (Mr Nga Kor Ming)EN

Thank you, Honourable Member for Hulu Rajang. Please, the Honourable Member for Papar.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. The Ministry of Rural Development has been allocated RM5.23 billion to lead rural progress, although last year's budget totalled RM5.42. Item B.22, Item 030000 – Rural Economic Empowerment, was allocated RM1.38 compared with RM1.29 the previous year. This means there is an increase that we should be proud of. Item 030300 – Council of Trust for the People (Majlis Amanah Rakyat, MARA) was allocated RM1.37 billion compared with RM1.29 billion the previous year. This increase will help MARA run its operations in an orderly manner. In Kinarut there is an MRSM school. I understand this school is under MARA. With such a large allocation, I plead that the MRSM Kinarut school be given a larger distribution of funds, given the many school needs that have not yet been provided and implemented. I combine Item 01703 – Rural Electricity Supply together with Item 02003 – Rural Water Supply. Rural water supply has been allocated RM350 million compared with RM203.3 million the previous year. This is an increase of RM147 million or RM72 million. Thank you for the increase in allocation provided. Sabah will be able to fulfil, to some extent, the promises made for the welfare of the people.

The Ministry of Rural Development (KPLB) Sabah targets that all rural villages in Sabah will enjoy clean water and electricity supply facilities by 2035. In P.175 there are indeed many villages that do not yet have water and electricity supply at this time. I will not mention these villages again, as I have often mentioned them. There are also villages on the outskirts of towns that do not have water and electricity supply. With the consistent funds provided by the government, I am indeed optimistic that KPLB Sabah's target will be achieved. If rural electricity and water supply can be implemented, it means many residents of Sabah can enjoy the development that has been promised all this time until the change of government. What I wish to request for them is that the relevant government agencies must be lenient and not too strict when there are among these village residents who cannot settle their electricity bills or water bills, for the first reason, which is poverty. Second is the distance to the place where they pay these bills. This is because of the poor roads that do not allow vehicles to travel back and forth to their places. The imperfect condition of the roads to rural villages has also caused many vehicles to be unwilling to come and travel to these villages.

Item 02300 – Rural Roads was allocated RM880.6 million compared with RM787.1 million previously. This increase shows the government's commitment to the people. Of this amount, how much will be distributed to the state of Sabah? This is because the state of Sabah is very large and hilly. Sabah indeed does not have perfect roads, especially rural roads. We will see that many rural roads are not maintained regularly. This causes many roads to be pitted and uneven. Item 0200 – Village Connecting Roads. This is allocated RM120 million. Of this amount, how much will be distributed to the state of Sabah? This is because there are still many village connecting roads that have not been implemented due to a lack of funds for the intended development. Item 03200 – Community Welfare Development Scheme. The government has allocated RM280 million compared with RM217 million. Of this amount, how much will be distributed to the state of Sabah, given that Sabah is a state far behind in development compared with states in the Peninsula? With the allocation provided, we will be able to improve the welfare of rural communities comprehensively. I would like to know what community welfare development is intended, and I hope for clarification from the ministry so that applications can be made after this. Thank you. I support this Budget.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Member for Papar. Next, the Honourable Member for Lenggong is not in the House, so now I invite the Honourable Member for Ledang. Before the Honourable Member for Ledang, I intend for the Honourable Deputy Minister to begin winding up at 9.15 pm, and the 45 minutes that were not enough will be for written replies. The Honourable Member for Ledang, please.

Mr Chairman, may I request that you call a few more names so that I can make sure whether I have the opportunity to debate tonight or not.

Mr Chairman (Tuan Nga Kor Ming)EN

Yes, actually I very much wanted to give the opportunity to the Honourable Member for Tumpat, but time is very jealous. Perhaps we can wait; we can write a letter to the Honourable Minister for a written reply. There are about five more Honourable Members. I am actually now, if the Honourable Member for Ledang- I announce. The Honourable Member for Ledang, the Honourable Member for Kota Samarahan, the Honourable Member for Ipoh Timur, the Honourable Member for Dungun and the last, the Honourable Member for Cameron Highlands. Please.

Thank you, Mr Chairman. I wish to refer to Item 051200 – Allowances (Village Community Management Council (MPKK)). I was actually searching for where there is an item relating to grants to MPKK. Perhaps this is where the item is, because in terms of MPKK, it is an important institution as an intermediary to the grassroots. Therefore, I want to see how far the status of grants to MPKK has progressed. How much has been approved and implemented by state? How are these grants monitored? Next, how do the quality of leadership and management of MPKK differ compared with the JKK in the past? I also hope the ministry can help the village heads of MPKK, particularly to facilitate the application process for obtaining these grants, apart from preparing village profiles, but I also believe they need help so that it reaches residents or the community. Second is regarding Item 00400 – KEMAS (Early Childhood Education), because early childhood education is quite important, involving a total of 227,267 children aged four to six years. There are 509 taska and 10,966 tabika. This means it is a large number and must be given attention. So I want to ask, how many of the teachers or educators in KEMAS have a Diploma in Early Childhood Education or a degree. How does the ministry view raising the quality of teaching and learning, and how will this be in line with the preschool syllabus, and also keep pace with the rapid growth of technology, Industry 4.0. The third and last is regarding Item 050300 – Village Community Centre (PKD). As announced last October, this is a rebranding of RTC and mini RTC, and the RTCs in Melaka, Pahang, Johor, Kedah and Terengganu remain under KPLB, which has been rebranded. So I think it is important, because when rebranded, it was stated that they will become digital villages, activity centres, women's empowerment programmes and so on. In Johor, it was stated there are as many as 24 PKD. So, my question is, how far has the PKD been established in reality, the performance of PKD service delivery, and when, and what is the plan for PKD in the North Johor area, especially what I have seen for a long time, which is somewhat sidelined, somewhat separated from the assistance or needs that could be provided by the mini RTC formerly, or UTC or others. I hope these services can be provided because they are very, very helpful to residents, especially senior citizens and persons with disabilities who do not have easy transport to reach the mini RTC. In my neighbouring constituency of Tangkak, Johor, they have to go to Sungai Rambai in Melaka or to Bandar Melaka. So I hope this matter can be considered by the ministry. Thank you, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Member for Ledang. The Honourable Member for Kota Samarahan, please.

Puan Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you, Mr Chairman. I go straight to the first item, Item B.050900 – Maintenance and Repair of KEMAS Buildings. I wish to draw the attention of the ministry or the Honourable Deputy Minister to KEMAS buildings, especially KEMAS kindergartens that are in dilapidated and dangerous condition, and some that are in the status of sharing premises. Therefore, in 2020, we see a significant increase in the allocation for the purpose of this item. Therefore, I want to request the status of progress of the application for upgrading of the kindergarten, namely Tadika KEMAS Serpan Ulu, which is still sharing premises in a surau. Tadika Kampung Baru, dilapidated, and the number of children is large. Tadika Kampung Tanjung Parang, dangerous and dilapidated. Tadika Kampung Sindang Baru, dilapidated and with many pupils. Tadika Kampung Tanjong Apong, dilapidated and dangerous.

Puan Rubiah binti WangPBB · GPSKota SamarahanEN

Tadika Kampung Jawa Semenggok and also Tadika Kampung Sidanu. These are applications that have been around a long time, waiting in the queue, they say, and our hope is that in the 2020 allocation they can be considered. For the second item, Item P.00900 – Sarawak Rural Development Institute located in Kota Samarahan. We would like to inform you that the establishment of INFRA in our area has truly helped greatly in promoting rural community development, especially in increasing knowledge and skills in terms of leadership and also changes in attitudes in rural communities. However, I want to request the Honourable Deputy Minister to inform us of the programmes, namely human capital development programmes, skills programmes, leadership programmes, attitude change programmes implemented throughout 2020. Who are the targets and how can we obtain the services or programmes organised by INFRA in question.

Puan Rubiah binti WangPBB · GPSKota SamarahanEN

Next, Development Purpose P.22 Item 02404 – Rural Mega Surge Programme, Item 02503 – Rural Economic Development, Item 02600 – Community Economic Development and Item 03200 – Community Welfare Development Scheme. All the programmes displayed in these items are intended to improve rural development, especially in terms of economic development, infrastructure and also social development in villages. We would like to inform you that these programmes have indeed had much impact, especially in the development of those villages. However, I wish to request clarification from the Honourable Deputy Minister regarding the method of implementation, which was also mentioned by Sabah just now, in Sarawak, previously in terms of planning, implementation, monitoring and also impact studies were carried out by the district officer. This is because the district office leads the focus group for implementing integrated community development programmes or rural villages. However, recently, proposals no longer go through the district office, because the district office will always deal with stakeholders, especially community heads, especially the implementing agencies of KPLB in question. Next, Mr Chairman, Item 01700 – Rural Electricity Supply, Item 02002 – Sarawak Rural Water Supply. I request details from the ministry regarding the allocation for development projects for the state of Sarawak and also details for the Kota Samarahan Parliamentary constituency. Next, Item 02300 – Rural Roads. I also request details from the ministry about the roads approved under this item, including details for Kota Samarahan. Thank you, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you. Now I invite the Honourable Member for Ipoh Timur.

Mr Chairman, Maran. We have been waiting since the morning. Give me a bit of a chance.

Mr Chairman (Tuan Nga Kor Ming)EN

This ministry only begins after Maghrib.

With your permission, Mr Chairman. Before, we got to speak in the morning.

Mr Chairman (Tuan Nga Kor Ming)EN

We give the opportunity to the members...

Later, yes? Okay, thank you very much, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Please, the Honourable Member for Ipoh Timur.

Tuan Wong Kah WohDAP · PHIpoh TimorEN

Thank you, Mr Chairman. Mr Chairman, I would like to touch on Item 051200 – Village Community Management Council (MPKK) Allowance (Elaun Majlis Pengurusan Komuniti Kampung (MPKK)), which I wish to raise here: whether the Ministry intends to reconsider the age limit for village heads and MPKK chairmen in particular, which I understand was previously set at 60 years. In my constituency there are also two chairmen who are over 60, and I understand that they will not be given this MPKK allowance if the appointments are made. I believe many would agree that if we wish to appoint MPKK chairmen who are experienced and who are also able to serve the people, this age limit should be reconsidered. The second item is Item 01707 – New Installation of Village Street Lights. I note that the Minister has on several occasions previously announced the installation of 10,000 village street lights of the LED type, and that after that announcement this figure was increased to 60,000 LED street lights within two years, after MESTECC and also the Prime Minister's Department (JPM) each provided allocations to assist. I would like to ask here why the estimate for 2020 stated in this Item 01707 is RM10 million. However, when compared with the announcements made by the Minister previously, it is RM83 million a year. I would like an explanation from the Minister or the Deputy Minister as to why these two figures are not the same. I also wish to request that when the installation of these LED street lights is carried out in the Ipoh Timur area, where I have 11 traditional villages, a fair distribution be given to the villages under the Ipoh Timur area, including Kampung Pengkalan Gate, Kampung Pengkalan Pegoh, Kampung Pengkalan Tin, Kampung Sri Kinta and so on. The last item I wish to touch on tonight is Item 02403 – Integrated Area Development Programme amounting to RM46.5 million. Mr Chairman, in the traditional villages under the Ipoh Timur area, three of them, namely Kampung Seri Kinta, Kampung Pasir Puteh and Kampung Pasir Puteh Tambahan, did indeed experience very serious flash flood problems a decade ago, and the most recent occurrence was two weeks ago. Among the causes we have found are the lack of a good drainage and channel system and the problem of land reclamation at mining pools which is not well controlled. I request that the Ministry also be able to provide assistance to these traditional villages to resolve the flash flood problem, especially in the several villages that I have just raised. The Honourable Member for Sandakan wishes to interject. Is there none?... [Interjection] Okay, yes, yes. Please.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, the Honourable Member for Ipoh Timur, and thank you, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Yes, this is a tag team.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

I only want to raise one issue, namely on page 215, Items 00100 to 00600 under Community Development (KEMAS). I would like to congratulate the government for focusing on skills education and early education. Early childhood education is a very important sector for the community, especially for the B40 group. In the meantime, I would like to urge the Ministry to consider the establishment of KEMAS kindergartens (tabika KEMAS) in the People's Housing Programme (PPR) in the Sandakan area, such as PPR Mesra, which is inhabited by about 1,000 families, to meet the demand. Thank you. [Laughter]

Tuan Wong Kah WohDAP · PHIpoh TimorEN

Okay. Okay, thank you, the Honourable Member from Sandakan.

Mr Chairman (Tuan Nga Kor Ming)EN

That is why, friends, do not borrow time.

Tuan Wong Kah WohDAP · PHIpoh TimorEN

I will borrow one minute. [Laughter]

Mr Chairman (Tuan Nga Kor Ming)

Sila.

Tuan Wong Kah WohDAP · PHIpoh TimorEN

Thank you. That is all from me. Thank you, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Ipoh Timur, for keeping to time. Now I invite the Honourable Member for Dungun. Please.

Thank you, Mr Chairman, for allowing me to take part in the debate on the Ministry of Rural Development at the Committee stage. I will only focus on Item 03800 – Central Terengganu Development Board (KETENGAH) with an allocation of RM42,666,000. Looking at the Act of Parliament that approved the powers of the corporation established under the Central Terengganu Development Board in 1973, combined with the amendment in 1993, and with the addition of the Tasik Kenyir development area, the area of KETENGAH totals 653,075 hectares, which is approximately one-half of the area of the state of Terengganu, covering the interior districts of Dungun, Kemaman, Hulu Terengganu and also the Tasik Kenyir development area. Therefore, in the period of Budget 2020 allocated to this Ministry for the development of KETENGAH, which is nearly 47 years, I would like to ask the Minister: has the development of the interior areas involving economy, agriculture, industry and commerce been successfully established based on the objectives of its establishment?

Second, the construction of housing to meet the needs and requirements for shelter. How much is under construction and the expected completion dates of the projects, if any, and of upcoming housing projects. Third, there are five towns under the administration and management of KETENGAH, namely Bandar Baharu Cheneh, Bandar Seri Bandi, Bandar KETENGAH Jaya, Bandar Bukit Besi and also Bandar EMBS. However, since the opening of the East Coast Expressway 2 (LPT2), namely, these towns mentioned, because they are located on the Jabor–Jerangau road, have no longer become the main route, and problems have arisen in terms of development progress in the towns mentioned. So what is the study on planning to rehabilitate the economic and social conditions of the five towns mentioned? With the increase in population in the five towns developed by KETENGAH over nearly 40 years, what is the Ministry's role in efforts to raise the economic standard of residents by bringing in factories and investment opportunities that can be benefited by residents in the KETENGAH Region? It is also understood that there will be new, more competitive towns built. Can the Minister state the studies that have been carried out for the purpose of constructing these new towns, which are placed under the new competitive towns? Likewise, my request is that, because in the management involving the authorities...

Mr Chairman (Tuan Nga Kor Ming)EN

The Honourable Member for Dungun, the Honourable Member for Maran wishes to interject. Yes.

Ya, sila.

Mr Chairman (Tuan Nga Kor Ming)EN

Please, the Honourable Member for Maran.

I think, Mr Chairman, I agree with the Honourable Member's view on the construction of this new town.

However, with the construction of new towns, what is the proposal to build KEMAS offices that are beneficial to the community as a whole? So, I would also like to propose that the Honourable Member include my proposal, where I, in Maran, need a new building for KEMAS, which we have submitted previously. I would like to take Maran as an example to be brought into the new town proposed by the Honourable Member. Please.

Mr Chairman (Tuan Nga Kor Ming)EN

Please, the Honourable Member for Dungun.

Thank you, the Honourable Member for Maran. Put it in the speech. God willing, it needs the Minister's answer. [Laughter] Then, finally, Mr Chairman, since part of the areas within the KETENGAH Region involve the upstream and interior areas of Kemaman, Dungun, Hulu Terengganu and also Tasik Kenyir. I request that there be coordination with the local authorities. Since it does not involve the operating areas of Dungun Municipal Council, Kemaman Municipal Council and also Hulu Terengganu District Council, there needs to be a coordination for the interest of the KETENGAH Region for the convenience of residents, such as waste management involving road cleanliness and others. I request that attention be given. Thank you, Mr Chairman.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Dungun. Now I invite the Honourable Member for Cameron Highlands to close the debate. Please.

Tuan Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Thank you, Mr Chairman. I will go straight to the items. Item 01700, namely Rural Electricity Supply. Thanks are extended to the government for increasing the allocation under this item for next year. In Expenditure 2019, the KPLB targeted 96 per cent of village areas in Malaysia to have access to 24-hour electricity supply. Has this target been achieved this year and what percentage is it, and what percentage is targeted by the Ministry for next year in terms of access to electricity supply, especially in the Orang Asli village settlements, particularly in the Cameron Higlands Parliamentary constituency and the whole country. Apart from that, I would like to know how many rural electricity supply projects in the Orang Asli village settlements have been approved by the Ministry, how many projects have been fully completed, and how many are still delayed. What are the reasons these projects are still delayed? Furthermore, what is the estimated total of rural electricity supply projects for 2020 that will be implemented by the Ministry, especially in the Orang Asli village settlements? I hope the Minister can give greater attention to the Orang Asli community because electricity supply has become a basic necessity for us in this country. The second item, Item 02000 – Rural Water Supply. About RM587 million will be allocated for rural water supply projects, with RM470 million of it channelled to Sabah and Sarawak. The KPLB has targeted 95 per cent of rural areas in Malaysia to have access to treated water supply in 2020. The issue of replacing old water pipes, which causes leakage and disruption of water supply, is very evident in the state of Pahang, especially in the Cameron Highlands Parliamentary constituency, namely in Bukit Kulit, Kuala Lipis. What action will be taken to improve this situation? A study by the United Nations found that some Orang Asli communities in this country still do not receive clean water supply and still depend on natural sources such as rivers. Most Orang Asli communities still depend on rivers as a water source, whether transported by bottles or through systems connected to the central grid with limited water, especially in the interior areas. So, what solutions will the Ministry take to overcome this issue, especially in the Cameron Highlands Parliamentary constituency and the whole country?

Tuan Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Third, in terms of achievements under the Tenth Malaysia Plan (RMKe-10) and towards the Eleventh Malaysia Plan (RMKe-11), a total of 142,056 houses have benefited from the rural electricity supply projects. Next, for Item 02300 – Rural Roads and Item 02400 – Village Connecting Roads. A total of RM1 billion has been allocated to build rural roads and village connecting roads. With the focus given to Sabah and Sarawak, Sabah receives RM326 million, while RM224 million goes to Sarawak. The problem of roads to connect Orang Asli villages is not a new issue. Potholed, narrow and damaged roads are a common sight when entering the remote Orang Asli villages in the interior. How much is allocated to build new roads and repair these damaged roads? Rural roads are very important for the growth of the rural economy, where many products can be taken out for sale. Roads also facilitate communication and other important facilities, especially health and education services. In the 2020 Budget, there is an increase in the allocation for this item. What is the Ministry's plan to achieve the target of 94 per cent of villages having access to rural connecting roads, especially those yet to be completed and especially in the villages of Orang Asli areas? I hope the Minister can give greater attention, and I hope we can cooperate for the good of the Orang Asli community so that we can provide road facilities to them, especially in the Cameron Highlands area and the whole area in general. Finally, Item 030000 relating to rural economic capacity. For Item 030100 – Village Entrepreneur Development, the allocation for this item in 2020 is reduced by RM364 thousand. What is the rationale for the government reducing the allocation for village entrepreneur development next year, and what strategy will the Ministry use to ensure the outcome performance of the programme can be achieved next year? Besides that, I would also like to know what is the poverty level of the Orang Asli community in Malaysia, and what is the average household income of the Orang Asli community in this country? Lastly, what development programmes will the Ministry implement especially for the Orang Asli community in 2020, and what improvement methods can be carried out to enhance their socio-economy? That is all, thank you.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, the Honourable Member for Cameron Highlands.

Mr Chairman, may I seek permission.

Mr Chairman (Tuan Nga Kor Ming)

Ya.

Mr Chairman (Tuan Nga Kor Ming)EN

I know usually...

I feel sorry for my villagers. The Minister is ready. If the Minister is willing to wait... [Recording unclear]

Mr Chairman (Tuan Nga Kor Ming)EN

Actually there are many interruptions. When I sit down, both sides are also the same.

Mr Chairman (Tuan Nga Kor Ming)EN

Whether just a little or at the very end.

I actually, Mr Chairman...

Mr Chairman (Tuan Nga Kor Ming)EN

But I think that is enough. Alright, Honourable Members. The Committee stage debate for the Ministry of Rural Development has ended.

Mr Chairman (Tuan Nga Kor Ming)EN

Now I invite the Honourable Deputy Minister to respond. The time is 45 minutes. The Honourable Deputy Minister only needs to answer those who are still in the House; for those who are not in the House, please provide written answers. Please, Honourable Deputy Minister.

Tuan Sivarasa RasiahPKR · PHDeputy Minister of Rural Development · Sungai BulohEN

Thank you, Mr Chairman, for allowing me to begin the winding-up debate, responding to the issues and questions raised by the Honourable Members who spoke earlier. I want to begin by recording my thanks to the 33 Honourable Members who gave their views in the short time allocated, which was five minutes. All the views were sound and the questions posed were good. For the 45 minutes allocated, I answer, and it is clear, Mr Chairman, that it is not enough to answer one by one the notes that have been sent to me by the officers of the Ministry of Rural Development (KPLB); there are nearly 100 pages of notes... [Laughter]

Mr Chairman (Tuan Nga Kor Ming)EN

I know, it is indeed as thick as a thesis.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

...that were sent just now. I will use an approach of answering according to the important topics. Many questions relating to specific areas we will answer in writing. However, I will give an assurance that whatever cannot be answered orally here will indeed be answered in writing. So, I would like to begin by making several observations on the allocation for the KPLB as a whole. Because there are views regarding a lack in certain respects and so on, I want to emphasise here that for the year 2020, the Ministry of Rural Development has received a budget that is roughly the same. If we add up the Operating budget and the Development budget, the KPLB has received for 2020 RM8.414 billion. This is slightly more than what was distributed last year by the MOF, which was RM8.413 billion. There are indeed changes between the amounts allocated for operating and development, but overall that is the budget. So, there is no significant reduction and so on. Now allow me to begin with— I will touch on the topic of infrastructure first. Infrastructure was touched on by the largest number of Honourable Members just now, including several from Sabah, namely the Honourable Member for Beluran, the Honourable Member for Beaufort, the Honourable Member for Keningau, the Honourable Member for Putatan and the Honourable Member for Papar from Sabah, and then the Honourable Member for Limbang and the Honourable Member for Sibuti from Sarawak, and the rest are from Peninsular Malaysia. Generally, Mr Chairman, I think all the Honourable Members who attend this honourable House will agree that in Malaysia we still have a big gap in terms of infrastructure levels between Sabah, Sarawak and Peninsular Malaysia. This has been acknowledged by the Right Honourable Prime Minister himself in his Malaysia Day speech in Kota Kinabalu last year and in Kuching this year, and this is the gap that we must correct. Therefore, we can clearly see from this year's budget that Sabah has received the largest allocation of all states in Malaysia. If we add up Sabah and Sarawak, it is more than half of the infrastructure budget distributed to the states in an effort to improve the situation that has been explained earlier by several Honourable Members. We know the situation there, but that is the situation we have inherited from 60 years of rule by the Barisan Nasional Government. This is now the challenge we face, and we cannot correct the absence of roads, the situation of treated water, the absence of electricity supply in hundreds, perhaps thousands, of villages in Sabah and Sarawak in one or two years. We need time as well, but indeed we will give the appropriate focus to this challenge to ensure that the gap that exists must be corrected. We cannot accept the large gap between the infrastructure we see in Peninsular Malaysia and the infrastructure we see in Sabah and Sarawak. The issue is...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

The Honourable Minister.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Let me finish first.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Yes, just a moment, Honourable Member.

Tuan Sivarasa RasiahPKR · PHSungai Buloh

Sila.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Oleh sebab itu, pengakuan dan keterangan tersebut perlu mendorong kementerian untuk mengambil langkah-langkah yang extraordinary. Kalau langkah biasa seperti yang dibuat oleh kerajaan yang lalu, ia akan terus melebarkan jurang perbezaan. Oleh sebab itu, langkah-langkah yang luar daripada biasa, kebiasaan yang diambil oleh kerajaan harus dilakukan. Pendekatan-pendekatan harus diambil oleh kementerian sekarang ini untuk mengurangkan jurang perbezaan yang amat ketara antara luar bandar di Sabah dan juga antara luar bandar berbanding dengan luar bandar di Semenanjung dan di Sarawak. Saya yakin Yang Berhormat Menteri, Yang Berhormat Timbalan Menteri peka dan sensitif akan keperluan baharu ini. Terima kasih.

Sedikit Honourable Minister. Sedikit sahaja.

Tuan Sivarasa RasiahPKR · PHSungai Buloh

Sila.

Tadi saya setuju dengan pandangan Honourable Lembah Pantai sekiranya kaedah yang sebelum ini tidak memuaskan, cuba cari kaedah yang baharu. Kami dapat menerima sekiranya perjalanan pembangunan ini diteruskan. Saya juga bimbang dengan pandangan daripada MP Putatan, berkenaan tentang contract driven ini. Di Sarawak berlaku, kita bimbang ada individu yang menghantar cadangan-cadangan kontrak dan tiba-tiba jalan dibina. Di kawasan saya berlaku pada tahun ini. Di Sarawak juga, kalau di tempat saya sendiri selepas tahun 2009 baru kita nampak jalan-jalan dan air dipasang. Sehinggakan tempat kelahiran wakil-wakil rakyat pun, mereka membesar tanpa elektrik, baru tahun 2010 menerima elektrik dan air. Kita kena accelerate pembangunan di Sabah dan Sarawak dan juga saya menyokong pandangan Honourable Beluran.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Baik saya terima pandangan yang dilontarkan tadi oleh Honourable Beluran dan juga Honourable Sibuti. Saya secara ringkas, saya hendak sebut kita masih ada beberapa cabaran. Cabaran yang pertama ialah memang apa-apa pembangunan di Sabah dan Sarawak mesti dilakukan dengan kerjasama kerajaan negeri. Itu merupakan satu cabaran dari segi agensi-agensi, jabatan-jabatan dan semua yang terlibat daripada atas ke bawah. Kedua ialah kos. Kos yang saya nampak yang digunakan dulu untuk prasarana air sebagai contoh dan elektrik. Elektrik maksud saya inilah grid electricity, air juga grid air daripada paip utama dan sebagainya, memang sangat tinggi. Itulah merupakan satu cabaran yang sangat besar. Oleh sebab dengan bajet-bajet yang sedia ada, memang akan ambil masa yang sangat panjang untuk Sabah dan Sarawak di bawa kepada tahap yang ada di Semenanjung. Secara ringkasnya, kita kena lihat kepada alternatif. Kita tidak boleh lengkapkan semua infrastruktur air, elektrik dan jalan di Sabah dan Sarawak dengan kos yang digunakan sekarang. Isu pelaksanaan sistem alternatif untuk elektrik dan air di Sabah dan Sarawak bagi saya akan merupakan satu cara untuk selesaikan masalah ini untuk beberapa kawasan yang perlukan air terawat dan elektrik 24 jam dan sebagainya. Akan tetapi dengan model-model yang digunakan dulu yang saya lihat pada lima, 10 tahun sebelum ini oleh kerajaan lama, kos alternatif pun sangat tinggi, ini yang problem. Benchmark, dengan izin, yang digunakan sebagai contoh untuk air terawat. Sistem air dipanjangkan kepada rumah kampung di KPLB ialah RM100 ribu dan RM120 ribu se rumah. Bayangkan, itulah kosnya dan kos yang serupa untuk elektrik. Dengan kos begitu, mungkin ada kawasan yang di Sabah dan Sarawak mungkin akan tunggu 20 hingga 30 tahun untuk menerima air yang terawat dan electricity 24 jam (bekalan elektrik 24 jam) dengan tahap itu.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Kita sekarang tidak ada pilihan. Kita terpaksa mencari pembekal dan teknologi yang sesuai dengan kos yang jauh lebih rendah daripada itu untuk sampai ke tahap itu. Jadi, itulah cabaran dia. Memang masalah yang disebut tadi oleh Honourable Putatan tentang kontraktor driven- pembangunan juga memang satu masalah.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Akan tetapi kos yang saya nampak ialah halangan-halangan yang apa yang jadi cabaran dan halangan yang besar ialah kos. Itu termasuk juga kos membina jalan. Kos yang saya nampak dari yang digunakan oleh JKR sebagai contohnya borang- BQ, dengan kos yang sedia ada itu memang juga terlalu tinggi. Kalau kita hendak akan belanja sebagai contoh untuk jalan yang spesifikasi R1, R1 is a basic road di kampung 4.5 meter lebar dan kita akan belanja sebagai contoh RM1.5 juta, RM2.5 juta untuk setiap kilometer. Tidak akan kita dapat membina jalan-jalan yang perlu di Sabah dan Sarawak. Kita perlu cari teknologi yang lain juga dan inilah cabaran yang kita menghadapi. Honourable Lembah Pantai.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Terima kasih Honourable Deputy Minister.

Honourable Tuan Pengerusi, saya mohon pertimbangan daripada Tuan Pengerusi sekiranya boleh membenarkan Honourable Minister menjawab soalan-soalan yang kami bangkitkan dalam perbahasan tadi. Jadi, kalau ada masa mungkin Honourable Minister boleh lah bagi laluan kepada Honourable Lembah Pantai kah- atau sesiapa, untuk soalan-soalan tambahan.

Tuan Sivarasa RasiahPKR · PHSungai Buloh

Baik.

Kalau tidak kejung kita menunggu di sini. Terima kasih Tuan Pengerusi.

Ringkas.

Mr Chairman (Tuan Nga Kor Ming)EN

Tadi saya sudah cadangkan kepada Honourable Deputy Minister. Tidak payah jawab mereka yang tidak ada dalam Dewan ini. Jawab sahaja mereka yang masih setia bersama kita dalam Dewan ini boleh Honourable.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Saya masih di sini.

Mr Chairman (Tuan Nga Kor Ming)EN

Yang lain kita bagi jawapan bertulis...

[Dewan Tepuk]

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Ringkas. Tadi Honourable Minister sebut...

Mr Chairman (Tuan Nga Kor Ming)EN

Honourable Kota Tinggi puas hati ya.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Honourable Minister ada sebut ....

Terima kasih Tuan Pengerusi.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

...Sebagai contoh untuk membina jalan di kawasan di negeri Sarawak R1, lebar 4.5 meter mungkin RM1.5 juta, RM2.5 juta satu kilometer jangkaan dia. Tadi Honourable Deputy Minister ada sebut untuk bina paip air ke rumah- rumah contohnya di Sarawak kosnya adalah mungkin RM100,00 serumah, satu rumah ya. Kalau ini adalah inflated cost, pada perkiraan kementerian apakah sebenarnya sepatutnya kos? What is the estimated cost it should be? Oleh sebab kita hendak tahu siapa, who has been profiteering daripada kos-kos yang tinggi ini?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Okey, secara ringkas kos-kos jalan untuk membina jalan- jalan boleh ada julat yang besar daripada satu juta kilometer sampai RM8 juta, RM10 juta, RM12 juta sekilometer. Ada dua jalan saya ada nampak kos RM8 juta dan sebagainya. So, itulah tadi masalah dia. Untuk air, itu satu benchmark ya di Sabah dan Sarawak akan tetapi bagi sayalah ini perlu dikurangkan menggunakan teknologi dan cara procurement yang lebih efisien. Itu cara yang mungkin kita boleh gunakan.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Akan tetapi saya hendak Tuan Pengerusi, oleh sebab ada ramai yang telah bertanya beberapa permohonan termasuk Honourable Kota Tinggi kita sudah ambil nota terperinci dengan semua permohonan. Jadi, saya bagi aku janji ini setiap permohonan memang kita tidak ada- saya tidak boleh jawab di sini, permohonan sekian-sekian telah diluluskan memang tidak boleh. Akan tetapi kita sudah dengar dan memang saya boleh kata di sini setiap permohonan itu akan diberi pertimbangan dengan sewajarnya ya dan jawapan akan diberikan. So, itu memang kita akan buat. Yang juga ada kategori Ahli-ahli Honourable telah tanya tentang beberapa projek-projek yang telah dipohon dahulu sama ada telah diluluskan atau tidak, itu pun kita akan jawab secara bertulis..

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Yang ketiga ialah kategori projek yang sudah diluluskan dan dalam proses pelaksanaan dan ada pertanyaan mereka, apakah status projek sekarang?

Honourable, Tuan Pengerusi.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Oleh sebab kalau saya pergi setiap persatu untuk setiap kawasan saya rasa itu akan buang masa untuk ramai lagi yang menunggu.

Mr Chairman (Tuan Nga Kor Ming)

Tepat sekali.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Lebih baik kita tumpu pada isu-isu yang besar isu-isu yang merangkumi lebih kawasan.

Faham, sedikit sahaja Tuan Pengerusi, sedikit Honourable Deputy Minister. Projek-projek yang dimohon akan tetapi belum diluluskan. Saya tidak sempat diberi bercakap oleh Tuan Pengerusi. Cuma saya hendak timbulkan iaitu Kompleks KEMAS di Maran ini. Bangunan sekarang ini kayu sudah lama sudah Honourable Deputy Minister. Jadi kita telah kemukakan peruntukan pembangunan pada kerajaan dahulu dan juga sekarang yang ini pun saya sudah kemukakan lagi. Akan tetapi setakat ini belum ada respons. Jadi saya minta supaya kalau rasa hendak minta KEMAS ini membantu kerajaan dan membantu rakyat maka saya minta supaya kerajaan mengusahakan mendapatkan peruntukan bagi membina bangunan baharu KEMAS Parlimen Maran. Terima kasih banyak.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Tuan Pengerusi, itulah jawapan saya secara umum tentang isu prasarana dahulu dan sekali lagi saya sebutlah setiap permohonan itu, setiap pertanyaan itu kita akan bagi jawapan yang spesifik pada projek yang di mana di kawasan-kawasan berikutan. Saya beralih sekarang kepada KEMAS oleh sebab masa pun sudah lalu. Jadi berkaitan dengan KEMAS, Department of Community Development (Jabatan Kemajuan Masyarakat, KEMAS) ini, beberapa isu dibangkitkan oleh beberapa Honourable Members. Satu ialah tentang beberapa soalan yang dibangkitkan tentang apa kementerian sekarang buat untuk kemajuan KEMAS secara satu institusi khususnya ramai yang sentuh tentang keadaan bangunan. Ada juga persoalan tentang kurikulum dan guru-guru dan sebagainya. Ministry of Rural Development (Kementerian Pembangunan Luar Bandar, KPLB) sentiasa peka tentang isu-isu ini dan sekarang usaha-usaha yang berterusan dibuat untuk memastikan tahap guru-guru itu dikekalkan dan diperbaik. Sebagai contoh, usaha kita sekarang dalam proses untuk memastikan guru-guru kita mesti ada kelayakan minimum iaitu diploma Pendidikan Awal Kanak-kanak itu satu syarat yang wajib dan usaha untuk membantu mereka yang tidak ada diploma itu untuk belajar dan lulus diploma itu memang ialah satu program yang sentiasa dilaksanakan dan inilah satu komitmen oleh kementerian bahawa tahap guru-guru ini memang kita akan sentiasa menambahbaikkan. Berkaitan dengan, begitu juga dengan kurikulum. Kita mungkin tidak boleh bersaing 100 peratus dengan tahap tabika-tabika swasta ya. Untuk tabika swasta ibu bapa terpaksa bayar mungkin RM400 seorang kanak-kanak-kanak-kanak setiap bulan dan sebagainya. Di KEMAS kita tidak minta duit begitu besar akan tetapi memang kita tahu juga, kita mesti deliver, dengan izin, satu produk yang baik. Kita tidak mahu tabika yang diuruskan oleh kerajaan. Akan tetapi dengan kurikulum yang dinampak macam kuno atau tidak setaraf dengan tabika-tabika swasta.

Honourable, Tuan Pengerusi.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Jadi, kurikulum selalu dikaji semula dan sekarang kita ada usaha spesifik untuk memastikan dengan Program Science, Technology, Robotics, Engineering, Arts & Mathematics (STREAM) bahawa penumpuan pada Sains dan Teknologi dan Matematik yang sangat penting dalam dunia sekarang ini, dunia moden, diberi keutamaan dan kita mula di peringkat KEMAS juga, peringkat Tabika. Jadi, kita ada program yang khusus untuk itu dan juga ada program-program yang khusus untuk- sebagai contoh untuk memastikan kanak-kanak kita dapat pendedahan dan kemahiran dalam bahasa Inggeris sebagai satu bahasa yang cukup penting. Memang mereka mesti menguasai Bahasa Malaysia- Bahasa Kebangsaan...

Honourable Minister taska ya, tabika.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Akan tetapi tumpuan kepada bahasa Inggeris. Soalan tentang Taska.

Terima kasih. Saya memang antara tajuk yang hendak saya sebutkan tadi akan tetapi tidak diberi ruang. Terima kasih kerana Tuan Pengerusi masih lagi memberi ruang kepada saya. Di dalam kementerian dalam kerajaan kita, kita ada beberapa taska ataupun tabika yang dikendalikan oleh kerajaan termasuk KEMAS, PERPADUAN, dan lain-lain. Sudah tentulah majoriti Tabika Perpaduan, KEMAS ini di luar bandar. Ada juga di bandar dan swasta yang lain.

Jadi, apakah usaha kerajaan sekarang, kementerian untuk menyelaraskan supaya dari segi kurikulumnya, dari segi pendidikannya, subjek-subjeknya dan lain-lain dapat diselaraskan. Kita tidak mahu- mungkin KEMAS, oleh sebab sebuah kementerian yang besar dia mendapat faedah lebih besar daripada mungkin Perpaduan. Jadi, apa usaha kerajaan untuk menyelaraskan perkara-perkara ini? Terima kasih.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Dari segi penyelarasan kurikulum secara asas, basic curriculum, dengan izin, semua tabika termasuk KEMAS, Perpaduan dan sebagainya, termasuk yang dikendalikan oleh Ministry of Education Malaysia (Kementerian Pendidikan Malaysia), semua menggunakan Kurikulum yang sama. Kurikulum itu disediakan oleh Kementerian Pendidikan Malaysia dan diwajibkan oleh semua tabika termasuk tabika swasta juga. Itulah kurikulum yang digunakan oleh KEMAS juga. Akan tetapi, memang kita ada membuat penambahan yang kita anggap sesuai untuk keadaan di kawasan-kawasan luar bandar. Inilah penambahbaikan yang dibuat oleh kita sendiri. Dari segi standardization itu, dengan izin, tidak ada apa-apa isu. Berbalik kepada kualiti guru-guru, mereka ialah di dalam skim, tahap dia dalam kerajaan ialah Penolong Pegawai Pembangunan atau Pemaju Masyarakat Gred S29. Gaji juga merupakan syarat-syarat yang ditetapkan oleh kerajaan. Jadi itu yang berkaitan dengan guru dan kurikulum juga. Isu yang dibangkitkan oleh ramai...

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Honourable Deputy Minister, boleh sedikit?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

...Ahli-ahli Honourable. Biar saya habiskan point ini dahulu.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Point guru ini.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Oleh ramai Ahli-ahli Honourable ialah berkaitan dengan bangunan...

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Bangunan sudah terlebih Honourable Deputy Minister. Saya hendak pergi guru boleh?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Biar saya habiskan jawapan ini dahulu. Jadi, memang ini kita terima sebagai satu realiti. Ada banyak premis di dalam keadaan usang ataupun uzur yang memerlukan renovation dan sebagainya. Saya minta kerjasama daripada- memang yang terlalu usang atau uzur, sila beritahu pada kementerian secara secepat mungkin dan itu akan diberi keutamaan dari segi kegunaan bajet kita...

Honourable Deputy Minister.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

...Untuk memastikan prasarana atau bangunan KEMAS...

Pohon mencelah sedikit.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

...Adalah yang terbaik.

Sedikit sahaja.

Tuan Sivarasa RasiahPKR · PHSungai Buloh

Let me finish the point first then I will come back to you.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya Besar

You already finish that point.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

So, ini yang saya hendak sebut, kita tahu keadaan ini memang wujud, bajet yang disediakan untuk tahun ini daripada apa yang kita lihat di sini adalah sebanyak RM9.5 juta, saya terima itu tidak cukup. Anggaran saya secara peribadi ialah kita perlukan lebih kurang sebanyak RM100 juta untuk repair ataupun buat bangunan baru untuk semua bangunan. Pastikan semua bangunan KEMAS kita adalah di dalam keadaan yang baik di seluruh negara. Akan tetapi itu akan mengambil masa sedikitlah. Kita kena rujuk balik kepada Ministry of Finance (Kementerian Kewangan) untuk peruntukkan lebih besar. Saya bagi Honourable Putatan dahulu dan selepas itu Honourable Segamat.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya Besar

Paya Besar?

Baik, terima kasih...

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Paya Besar selepas itu ya.

Honourable Minister...

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the microphone]

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Honourable Paya Besar dahulu.

Mr Chairman (Tuan Nga Kor Ming)EN

Honourable Paya Besar.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Terima kasih Honourable Deputy Minister. Saya hendak merujuk kepada guru yang disebut oleh Honourable Deputy Minister tadi, S29 kalau tidak salah saya. Saya cuma hendak tanya, saya dimaklumkan KEMAS ada seramai 17,905 orang kakitangan, yang tetap hanya seramai 851 orang, seramai 9,798 petugas kontrak dan service ini adalah sementara kontrak tetap. Jadi, apa nasib mereka ini Honourable Deputy Minister? Jikalau kita hendak anak-anak kita diajar dengan kaedah yang lebih baik, kita kena bantu guru ini terlebih dahulu, kenapa? Ini kerana gurulah yang akan mengubah nasib anak- anak.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Baik. Isu sama ada guru-guru atau pemaju masyarakat yang kita ada di tabika berhak untuk mendapat jawatan tetap itu. Kita ada dasar yang dibuat oleh kerajaan dahulu, dasar itu ialah selepas berkhidmat selama 15 tahun sebagai pegawai kontrak mereka berhak memohon dan diluluskan sebagai kakitangan tetap. Saya difahamkan ramai, kita akan bagi jumlah kakitangan kalau perlu dalam secara bertulis berapa ramai sudah di tukar daripada status kontrak kepada tetap.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Ini bermakna jaminan pihak KPLB selepas 15 tahun akan diletakkan sebagai tetap?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Mereka berhak, kita tidak jamin tukar secara automatik, mereka berhak memohon.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Bermakna masih pegang dasar yang lama? Masih pegang dasar yang lama?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Ya, dasar itu kekal.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya Besar

Terima kasih.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Dasar itu belum tukar, tidak ada apa-apa perubahan kepada dasar itu. Itu yang saya boleh sebutkan di sini. Honourable Putatan dan Honourable Segamat.

Terima kasih Honourable Deputy Minister. To be more specific, apa yang saya utarakan tadi yang dikongsi oleh Honourable Samarahan, Honourable Sibuti, Honourable Beaufort dan Honourable Papar tadi bersangkut paut dengan apa yang diutarakan tadi oleh Honourable Deputy Minister tentang bangunan yang usang, jambatan yang usang, jalan raya yang perlu dibaiki. Apa yang saya utarakan tadi itu apabila ada kontraktor, dia mempunyai hubungan dengan pejabat daerah, membuat permohonan terus kepada pegawai di kementerian tanpa melalui Ahli Parlimen. Ini yang saya cakap kontraktor different project. Jadi, kadang-kadang permohonan mereka ini, permohonan yang lebih fokus kepada keuntungan and not benefiting the rakyat. Ini yang merosakkan negara, merosakkan janji kita, merosakkan kepercayaan rakyat kepada kita. Ini yang- jadi kalau yang tadi itu yang memberi repot kepada Honourable Deputy Minister, kadang-kadang boleh ditukar. Itu yang kami kongsikan tadi, terima kasih.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Kita ambil perhatian. Sila Honourable Segamat.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

Honourable Deputy Minister, since the ministry has received only RM9 million, compared with the RM100 million it wanted. But since I sit over here I am gentle; over there they are a bit rougher. Still, there is only RM9 million, so I will make a suggestion. For example, the building I mentioned just now, the KEMAS building at Paya Jakas, has been declared unsafe by the fire department (BOMBA). To rebuild it would cost RM1 million. This is RM9 million, which means that giving RM1 million to Segamat would be unfair to the others. So I want to suggest that we think outside the box. Ten metres from the KEMAS building is the Sekolah Rendah Kebangsaan Paya Jakas, which has an additional building that only needs refurbishment. Perhaps it would cost about RM80,000 to RM90,000. Would KEMAS be willing to work with the Ministry of Education Malaysia to renovate the building, repair the roof and so on, and then rent it from the school until the Honourable Deputy Minister's ministry has the money to build a new one?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Mr Chairman, for specific cases we are ready to sit down and discuss them. We cannot give a "yes" or "no" answer in this situation. But I do see that there is merit in them, and we are ready to consider them. So, on the KEMAS matter, Mr Chairman, the views and questions were raised by Honourable Kuala Kangsar, Honourable Beaufort, Honourable Arau, Honourable Segambut, Honourable Paya Besar, Honourable Limbang, Honourable Jeli and Honourable Sibuti, and this is my reply to the important points they raised.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

[Spoke without using the loudspeaker]

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Sorry, Honourable Segamat, I apologise.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

Segamat became Segambut.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

I apologise, Honourable Segamat. So, that is what relates to the KEMAS matter. Now I move on to the MPKK matter raised by Honourable Rasah, Honourable Pasir Mas, Honourable Arau and also Honourable Setiu. If I am not mistaken, Honourable Setiu also raised it. Yes, Honourable Setiu. Honourable Pasir Mas and Honourable Setiu questioned why the MPKKP is now- and also Honourable Arau raised why the Federal Government has now decided to set up the MPKKP in five states governed by the opposition, namely Kelantan, Terengganu, Pahang, Perlis and also Sarawak. This issue was raised in the debate and in my winding-up at the policy stage, and I will just briefly, I do not want to repeat all the points I made at that stage. I repeat them here, for the record of this august House and the Committee now sitting.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

This decision was made at the Cabinet level and not only at the level of the Ministry of Rural Development. This decision was made after our efforts over more than one year since the change of government in May 2018.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

We have tried the MPKK system in these states, but we have seen that we have faced great difficulties, challenges and obstacles in ensuring that complete information on the Federal Government's programmes and policies, and also the programmes that specifically, with permission, deliver benefits to the people, reaches them. All of this we have had problems delivering, with permission, to deliver benefits to the people in these five states. For example, just in Sarawak, not in other states. In Sarawak in October last year, the State Government of Sarawak went so far that the State Secretary issued a written instruction through a circular that members of the JKKK, a term still used there, are completely prohibited from attending programmes organised by Members of Parliament from the Pakatan Harapan government or Pakatan Harapan State Assemblymen. That is why, after considering all these factors, the Cabinet decided that we need a new channel and new body, and therefore the decision to set up the MPKKP was taken.

Puan Rubiah binti WangPBB · GPSKota SamarahanEN

Honourable Deputy Minister, may I interrupt?

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Let me finish my reply first and after that I will give you the floor. There was also a question about the allowances that are now paid to the existing MPKK. We are not disturbing the appointment of the MPKK who have been appointed by the state governments in these five states I mentioned. For example, in the state of Sarawak, the appointment of Tuai Rumah and Ketua Kaum appointed under certain laws in the state of Sarawak is not disturbed or touched. On that we are clear. The responsibility for paying any allowances to the existing MPKK lies with the state government that appointed them. We leave that to the state government: whether or not to pay is the decision of the state government, and that is the state government's responsibility. What the Federal Government will do is set up a new body from 1 January, the Federal MPKK, and any allowances or financial benefits given to the MPKK will be the responsibility of the Federal Government. Honourable Kota Samarahan.

Puan Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you, Honourable Deputy Minister. This also concerns the MPKK in Sarawak. For the information of the Honourable Deputy Minister, the establishment of the MPKK has indeed not affected the JKKK, but on our side, the establishment of the MPKK in every village has already confused the people, because, for the information of the Honourable Deputy Minister, the appointment of KKKM has been under the Ordinance Act of the state government under the local authority, and under the appointment of village leaders, it has already been agreed that the JKKK be established. Automatically, in terms of its roles and responsibilities, it is to ensure the development, administration and management of the village, and the JKKK is not only to ensure village administration but also to monitor development and also disseminate the policies and government policies, whether Federal or state. So far we have had no problem, Mr Chairman. Only, perhaps there is a misunderstanding here regarding the circular notified to the village leaders and Ketua Kaum. The circular does not refer to the JKKK, but the circular refers to the Ketua Kaum, who are informed that if there are programmes focusing on the state, meaning development, meaning priorities must be implemented, priorities must be given by the Ketua Kaum and village leaders. In terms of notifying policies and government policies within these two years, the JKKK has had no problem; indeed, other agencies such as RTM, the Department of Information and KRT also took part in disseminating state and Federal Government policies, development and programmes to the community, and there was no problem. But when the MPKK and the JKKK exist, the overlapping of functions and objectives occurs. That is, in terms of the functions and objectives carried out by these two NGOs, they overlap and can cause confusion and division in the village concerned.

Puan Rubiah binti WangPBB · GPSKota SamarahanEN

So, we request that the Federal Government consider holding direct discussions with the Sarawak State Government and other state governments to ensure that the implementation of the MPKK or JKKK can be carried out properly for rural community development.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Mr Chairman, I continue. With respect to Honourable Kota Samarahan, we disagree somewhat with the view just given. For the Federal Government, we have seen it, and I will give an example: that circular, I have it, and it is very clear that it takes a stance that we cannot accept. We have asked for that circular to be withdrawn. The reply given at that time was that the prohibitory circular was issued prohibiting- for all of us, Ketua Kaum, Tuai Rumah and JKKK, from attending programmes of People's Representatives, Members of Parliament and State Assemblymen from Pakatan Harapan. So, that is very extreme, and it was said at that time that it was issued because the Federal Government had suspended the payment of allowances. The suspension of allowance payments was in fact made for all states, not only Sarawak, and by coincidence it was extended last October until now; but in that same month the circular was issued. So, this shows that the situation is not suitable for continuing with the existing structures. For the Pakatan Harapan Government it is very important that information and benefits about welfare programmes, all Federal Government programmes, must be delivered to and enjoyed by the people throughout Malaysia, including these five states. So, that is the reason for it.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Honourable Deputy Minister, I request an explanation.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Let me finish my point first. And this is not a new phenomenon. The MPKKP has in fact existed since 2008, when it was set up by the previous government in Selangor, in Penang, in Kelantan and so on. So we cannot say, "Oh, that never existed before, and this is something new that will divide the village," and so on. It is an old phenomenon, and now we have no choice but to implement it. Honourable Pasir Mas, please.

Tuan Ahmad Fadhli bin ShaariPAS · PNPasir MasEN

Thank you, Honourable Deputy Minister. I want to ask two of my doubts. When the Honourable Deputy Minister spoke about the circular issued by the Sarawak Government, did the same issue arise in Kelantan, Pahang, Perlis and Terengganu? If it did not arise, then why suddenly the MPKKP? And I was interested when the Honourable Deputy Minister mentioned that it had actually existed since as far back as 2008. Does the Honourable Deputy Minister agree that the government today is merely continuing a policy that was already continued before, which is claimed to be unfair in creating a government within a government? Thank you, Honourable Deputy Minister.

Briefly, Honourable Deputy Minister. I used the same argument regarding introducing the JKKP in Selangor in my previous speech, and the problem that happened in Sarawak arose when a case from Bandar Kuching invited village leaders, and from that the problem escalated, and the government is said to have issued a circular, and what happened was a panic action between the Federal Government and the state government, when the government kept saying there would be a cut in allowances. And I also think that recently the Honourable Minister of KPKT and the Honourable Minister of Environment came to Sarawak and were also attended by village leaders, and the directive was issued by the District Officer; we still have discretion. I also see- I accept, and I thank the Minister who often comes to Sarawak. However, what is the role of the responsible Minister, the Minister of KPLB, who came to Sarawak only to meet the Chief Minister but did not discuss matters of this kind? The MPKK is viewed in a different context in Sarawak. In Kelantan perhaps it is in the villages, but we have longhouses, longhouses where one or two systems have been created. That is what is of concern. Do we have the good intention to sit together to discuss the establishment of the MPKKP?

I will not, because of what happened in Sarawak, Kelantan and Pahang were affected in receiving grants. What happened in Sarawak is that all MPKK were promised to receive RM10 thousand. Will this payment be automatic? This too needs to be explained. I do not want the MPKK that is being set up to keep waiting for this promised grant.

Mr Chairman (Tuan Nga Kor Ming)EN

Please, Honourable Member.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Thank you, Mr Chairman. Returning to the point raised by Honourable Pasir Mas just now. I agree that the circular only applies in Sarawak; there was no similar circular issued by the Kelantan State Government, for example. The situation in each state is not the same, and we accept that, but the basic point is the same: we have tried for more than one year, not only the Federal Government, since the change of government last year in May. We have gone straight to what was done before, which is to set up the MPKKP directly. We have given opportunities. We have tried for more than one year to see whether the structure can function for all parties. But what we found is that it did not work. Therefore, we have made a decision, and as I said just now, this decision was made not only at the ministry level but also at the Cabinet level. Everyone has sat down and discussed it, and this is the decision, namely that we will set up the MPKKP. On the point also mentioned by Honourable Sibuti, we have tried to negotiate. Last year, after the circular was issued by the Sarawak State Government, I myself, we pleaded with them to withdraw it, but until now it has not been withdrawn. So, we do not say there was no negotiation at the higher levels. I myself have met the relevant Minister and so on. The Minister of KPLB has also raised this issue, but we could not resolve it. Therefore, we have made that decision to implement it. Regarding the grant issue that was raised, as I said just now, we leave it to the state government to provide any financial facilities to the body appointed by the state government. However, any financial assistance from the Federal Government will now be channelled to the body appointed by the Federal Government, namely the MPKKP in these five states. Mr Chairman, I said just now that I had finished with the infrastructure issue, but I want to mention one specific infrastructure issue raised by Honourable Jeli, Honourable Parit Sulong, Honourable Setiu, Honourable Kuala Kangsar and also Honourable Paya Besar, namely about village street lights, so that I can answer their questions. I would like to confirm that the allocation for Village Street Lights (LJK) for the year 2020 is in...

Honourable Chairman, Honourable Minister, including Kota Tinggi just now.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Okay, I will include Kota Tinggi.

Please mention Kota Tinggi, yes. Thank you.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

Honourable, include Segamat too. This was missed.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

Segamat too, okay. We have an allocation from the Ministry of Energy, Science, Technology, Environment and Climate Change (MESTECC), which was mentioned earlier, for 20,000 units, and from the Minister of Rural Development (KPLB) for 35,000 units, and a large portion of these are the yellow HPSV ones, and there are also LED ones. The cost asked about by Honourable Kuala Kangsar is about 2,600 per unit. The implementing agency in Peninsular Malaysia is TNB, in Sabah it is SESB, and in Sarawak it is SEB. We will try to deliver to each parliamentary constituency 200 village street lights per Parliament. That is our target now for implementation.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

The issue raised by Honourable Paya Besar regarding Village Street Lights (LJK) for FELDA areas. Sorry, I must say here that the area is no longer under the purview of KPLB. FELDA is now managed by the Ministry of Economic Affairs. So, any budget for LJK must be sought there.

Mr Chairman (Tuan Nga Kor Ming)EN

Honourable Member, please wind up.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

So, our allocation will only be delivered to non-FELDA areas. So, since the time is already...

Mr Chairman (Tuan Nga Kor Ming)EN

Time is indeed up.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

I have reached my time limit. For other topics I will reply in writing, Mr Chairman, and for any specific questions to the areas concerned, we will give written answers.

Dato' Seri Dr. SantharaPKR · PHSegamat

[Bangun]

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

With that, I once again thank all the views and suggestions raised by the Honourable Members just now. I thank you, and also the Chairman. I see Honourable Segamat still wants to stand. Let us give way.

Mr Chairman (Tuan Nga Kor Ming)EN

He is indeed very fiery.

Dato' Seri Dr. SantharaPKR · PHSegamatEN

I ask that the written reply be provided, but please set a time limit. Because I do not want to wait until next year's budget. There are some things I requested last year that I still did not receive. Thank you.

Tuan Sivarasa RasiahPKR · PHSungai Buloh

Baik, baik.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya Besar

Setuju, setuju

Tuan Cha Kee ChinDAP · PHRasahEN

If possible, next week.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

I agree with that.

Tuan Sivarasa RasiahPKR · PHSungai BulohEN

The written reply will be delivered before the end of the meeting.

Dato’ Dr. Noraini AhmadUMNO · BNParit SulongEN

Before the end of this meeting.

Tuan Ramli bin Dato' Mohd NorUMNO · BNCameron HighlandsEN

I invite the Honourable Deputy Minister.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Mr Chairman, so far we have only received written replies from the Ministry of Health. The other ministries do not have them yet, Honourable.

Tuan Ramli bin Dato' Mohd NorUMNO · BNCameron HighlandsEN

I invite the Honourable...

Mr Chairman (Tuan Nga Kor Ming)EN

In fact the Deputy Minister of Rural Development has already- we say that what is good should be made an example, and what is bad we should make a boundary. From the Honourable Deputy Minister's reply, this is a good example, where the written reply will be supplied before the end of this session's meeting. Congratulations and well done. I hope the other ministries will do the same.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Next week, Mr Chairman. It is already outdated; they only received it in December.

Mr Chairman (Tuan Nga Kor Ming)EN

Thank you, Honourable Minister. Right, Honourable Members, the question is that the sum of RM3,191,709,400 for Head B.22, under the Ministry of Rural Development, forming part of the Schedule, be agreed to. [Question put and agreed to] [Sum of RM3,191,709,400 for Head B.22 ordered to form part of the Schedule]

Mr Chairman (Tuan Nga Kor Ming)EN

The question is that the expenditure of RM5,223,826,000 for Head P.22 mentioned in the Development Estimates 2020 be approved. [Question put and agreed to] [Sum of RM5,223,826,000 for Head P.22 approved as part of the Development Estimates 2020] [The Council resumed sitting] [Deputy Speaker (Tuan Nga Kor Ming) in the Chair]

Deputy Speaker (Mr Nga Kor Ming)EN

Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Thursday, 14 November 2019.

[The House adjourned at 10.09 p.m.]

Special ChamberSpecial Chamber

[Mr Speaker presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Rare DiseasesSpecial Chamber

Thank you, Mr Speaker.

Thank you also to the Deputy Minister of Health for kindly coming to answer my question regarding rare diseases.

Mr Speaker, I would like to record my highest appreciation to the Ministry of Health Malaysia (KKM) for the establishment of the National Rare Diseases Committee on 10 July 2019. This Committee can act as a driving agent to highlight the issues and challenges faced by rare disease patients, especially children. When will the Ministry of Health Malaysia plan to set up the long-overdue national registry for rare diseases so that we can know the current situation in this modern era?

There are many constraints for rare diseases, such as lack of funding, lack of access to medical care, and the absence of specialists and therapies for rare diseases, despite the developments and awareness of this matter in Malaysia. Therefore, what are KKM's short-term and long-term plans to address these problems and other related challenges? Will the National Rare Disease Policy introduced recently be one of the mediums to overcome the challenges mentioned. Thank you.

Dr. Lee Boon ChyePKR · PHDeputy Minister of Health · GopengEN

Thank you, Mr Speaker, and thank you to the Honourable Member for Batu Gajah.

The Ministry of Health Malaysia (KKM) has always paid attention and shown great concern in ensuring that every rare disease patient receives complete treatment in order to reduce the burden on the patients' families. Following that, the Ministry of Health Malaysia has developed the National Framework for Rare Disease, with permission, to establish a Governance Committee to integrate the management of rare disease patients in Malaysia. It is a comprehensive and holistic effort that also covers health education advocacy for the public, screening and diagnosis of patients.

In addition, it will also strengthen prenatal diagnosis and newborn screening, clinical management, referral systems, data collection and research related to rare diseases. In this Governance Committee, it is also joined by various stakeholders related to the management of rare disease patients in Malaysia, such as the Ministry of Women, Family and Community Development, the Department of Social Welfare Malaysia, the Ministry of Education and so on.

In terms of the short-term plan under this framework, it is to determine the definition of rare diseases in Malaysia. Besides that, this framework will also help strengthen the governance of rare disease services by strengthening laboratories, formulating policies and strategies related to the procurement and accessibility of orphan drugs and orphan products in Malaysia, where we may provide a pathway, faster access for orphan products. Meanwhile, the short-term plan of this framework will be able to strengthen advocacy and health education related to rare diseases.

As for the long-term plan, KKM intends to establish a registry related to rare diseases to collect and analyse data for the purpose of development and monitoring of patients' health in evaluating the clinical management programmes carried out. The Ministry of Health Malaysia also encourages research and development in fields related to rare diseases, and collaborates with insurance companies to protect patients with rare diseases. That is all, thank you.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Prioritise Domestic Agricultural ProductsSpecial Chamber

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Thank you, Mr Speaker.

According to the statistics of the Federal Agricultural Marketing Authority (FAMA), the value of fruit and vegetable imports in 2018 was RM8.5 billion, and we are overly dependent on China, Thailand, Australia, India and Africa. Statistics issued by the Department of Agriculture say that in 2018, 585 thousand metric tonnes of fruit were imported, while vegetables amounted to 1.49 million metric tonnes. Meanwhile, statistics for the third quarter of 2018 show that the agro-food sector contributed only 3.4 per cent to the gross domestic product (GDP).

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

I am of the view that cultivation of local vegetables and fruits has the potential to yield greater returns not only for the country but also for smallholders. Therefore, I urge the government to:

(i) Expedite the 18 strategies and 51 initiatives contained in the ministry's direction, especially in the production of local vegetables and fruits.

(ii) At the same time, the ministry must always go down to the ground and hear for itself the views or voices of smallholders before making any decision or government policy. Their views are more sincere and genuine for the common benefit, especially in rural economic development.

(iii) Furthermore, residents in the Yong Peng area often complain about the lack of a strategic location to trade or market their agricultural produce. It is hoped that a centre for collection and distribution of agricultural produce can be set up to meet the aspirations and needs of the people of Yong Peng.

As is known, Ayer Hitam and Yong Peng are famous for the production of fruits such as watermelon, pomelo (limau besar) and also vegetables. In fact, this area is the largest producer of local vegetables after Cameron Highlands. Therefore, the ministry is urged to give serious attention to this area in order to achieve the nation's aspiration to prioritise Malaysian products not only for the local market but also to penetrate the international market. That is all, thank you.

Tuan Sim Tze TzinPKR · PHDeputy Minister of Agriculture and Agro-based Industry · Bayan BaruEN

Thank you, Mr Speaker, and thank you to the Honourable Member for Ayer Hitam.

As an open economy, the trade of agricultural and food materials will continue to play an important role in the country's economic growth.

It is indeed acknowledged that the country imports a lot of food materials, namely 70 per cent for vegetables and 35 per cent for fruits. However, 78 per cent of the vegetables imported earlier and also 64 per cent of the fruits imported earlier are vegetables and fruits of temperate climate (tempered food). So, those that are not suitable to be planted in Malaysia are such as onions, potatoes, carrots, apples, mandarin oranges and grapes.

In 2018, the value of imports of the agro-food sector decreased slightly to RM5.1 billion compared with RM51.3 billion in 2017, a reduction of 2.3 per cent of GDP. For the second quarter of 2019, the agro-food sector also showed a slight increase, namely 3.5 per cent compared with 3.4 per cent in the third quarter of 2018.

For the information of the Honourable Member, all 18 strategies and 51 initiatives stated in the Direction Document of the Ministry of Agriculture and Agro-based Industry, Priorities and Strategies 2019 to 2020 are being actively implemented by the ministry.

Regarding the production of local vegetables and fruits, which is placed under Direction 3, Strategy 1, Initiative 3, generating income through the Rakyat Agriculture Project (PPR). The achievement status is as follows:

(i) The target for the second quarter in terms of fruits is RM1.13 billion.

The achievement is RM1.15 billion, exceeding the target by 2 per cent, i.e. 102 per cent;

(ii) Vegetables, the target is RM984.2 million, the achievement is RM886.9 million, i.e. 90 per cent.

As the ministry responsible for looking after the welfare of farmers, the ministry's staff always go down to the ground to hear the voices of farmers who run small-scale agricultural projects. For example, under the Department of Agriculture, district agriculture officers, crop extension agents and agro-based industry extension agents carry out scheduled visits to farmers. A total of 207,555 farmers were visited throughout 2018 through agricultural services and extension.

Meanwhile, as of June 2019, a total of 97,361 farmers or projects have been visited through the same programme. In addition, the ministry itself, including the Minister, Deputy Ministers and top management, also often holds ground visits and

Tuan Sim Tze TzinPKR · PHDeputy Minister of Agriculture and Agro-based Industry · Bayan BaruEN

dialogue sessions with farmers to understand the issues and problems faced and to obtain their views on the ministry's programmes and plans. In the Honourable Member's area, I have gone down twice, as the Honourable Member knows, in the Honourable Member's own area.

The Yong Peng district is indeed well known as a centre for fruit collection in Johor given its strategic location. At present, there are 10 private collection centres operating in this area. Besides that, there is also a seasonal fruit sales site supervised by the Yong Peng District Council, at Jalan Ayer Hitam, Labis.

For the information of the Honourable Member, FAMA once established a collection centre in this area in 2010. However, it did not receive a good response because farmers preferred to market their produce to private middlemen. Nevertheless, the ministry has noted the proposal from the Honourable Member for Ayer Hitam that the government set up a centre for collection and distribution of agricultural produce in the Yong Peng area and will give due consideration to the proposal.

Continuous efforts to strengthen and expand the export market for Malaysian fresh agricultural products will continue to be implemented through participation in trade exhibitions, trade missions and promotional programmes in collaboration with Malaysian embassies overseas. For 2019, promotional programmes for major fruits such as pineapple, MD2, durian, watermelon and starfruit have already been arranged. Among the overseas locations involved are Japan, China, Hong Kong, France and Italy.

As for market access, we are negotiating with other countries such as South Korea, Taiwan, Australia and so on to open larger markets for Malaysian fruits and agricultural products. That is all, thank you.

Mr SpeakerEN

Thank you, the Honourable Minister. Honourable Members, the Special Chamber sitting today is adjourned until 2.30 pm on Thursday, 14 November 2019.

[Special Chamber adjourned at 2.47 pm]