Dewan Rakyat · 7 December 2020

15th Parliament, session 3, meeting 3 · 495 turns · 37,600 words · official PDF ↗ · Digital Hansard ↗

435 of 495 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Mr Speaker presided over the Sitting]

Oral Answers to QuestionsQuestions

Wilson Ugak anak KumbongPRS · GPSHulu Rajang · questionEN

1. Datuk Wilson Ugak anak Kumbong [Hulu Rajang] asked the Minister of Rural Development to state the status of rural infrastructure projects under the ministry, namely rural road projects, electricity supply and water supply, particularly in the Parliamentary constituency of Hulu Rajang and generally in the state of Sarawak.

Datuk Dr. Haji Abd. Latiff bin AhmadUMNO · BNMinister of Rural Development · MersingEN

Thank you Mr Speaker, thank you Honourable Member for Hulu Rajang. For the Eleventh Malaysia Plan, for the state of Sarawak, from 2016 to 2020 under the Eleventh Malaysia Plan, there are a total of 15 projects for rural water supply, of which five have been completed, five are under construction, none are at procurement, one is at design stage and four are at the appointment of consultants stage. Of the 15, Mr Speaker, six are in Hulu Rajang, with three projects in 2016, of which one has been completed and two are under construction. In 2017, one project is under construction. In 2018 there are none, and in 2019 there are two projects, one under construction, which I mentioned earlier under the Eleventh Malaysia Plan, namely BELB in Hulu Rajang, of which four are under construction and one has been completed. For rural water supply in the state of Sarawak, there are 40 projects that are being implemented, with a total cost of RM2.4 billion. Of these 40 projects, 11 have been completed, 13 are at the implementation stage and 16 are at the design stage. Meanwhile for rural roads in Hulu Rajang, in 2017 there was a project to upgrade the road to the agricultural lots of the Bakun resettlement scheme, Sungai Asap. I have already reached Sungai Asap in Sarawak. At the design stage is a project worth RM9 million for the house road from Jalan Juntan to Jalan Melukut, which is 60 kilometres long, and it is at the appointment of consultants stage. The timber road, resettlement to Tegulang Phase 5 in Kapit, is at the design stage with a total of RM61 million. There are two more, namely the timber road to Metalon Phase 6 with a total of RM112 million at the consultant stage. Another road is the access road to SK Lubuk Bayang and Klinik Nanga Sekarok, at the design stage with a total of RM48 million. In total, RM290 million, Mr Speaker. Thank you.

Mr SpeakerEN

Thank you Honourable Member. Supplementary question.

Datuk Wilson Ugak anak KumbongPRS · GPSHulu RajangEN

Thank you Honourable Minister. Not only has he answered, but he has also personally visited the Hulu Rajang constituency. Honourable Minister, I request that you state or guarantee that development across the entire state of Sarawak, Honourable Minister, be implemented equitably starting from Budget 2021. I also request that another road network, namely from Nanga Mujong, Nanga Tiau to Bukit Mabong District, Sungai Tunoh, 70 kilometres long, be included in the list for the Twelfth Malaysia Plan. Thank you Honourable Minister.

Mr SpeakerEN

Thank you Honourable Member. Please proceed.

Mr Speaker, I want to guarantee this, but I dare not guarantee it. The PH Government, the BN Government, after this there may be an election, wallahualam bissawab. However, what has been and is being done by the Federal Government of PN together with the Sarawak State Government, which is also PN, we have a top committee chaired by the Honourable Federal Minister and also the Deputy Chief Minister, Honourable Douglas Unggah, who has also been at the Centre for a long time. This committee operates to ensure that we have a working committee and a technical committee, in which all the Honourable Ministers at the Sarawak state level also attend the meeting, and it is attended by all the Heads of Departments at the Federal level. I am confident that with this cooperation, we will ensure that all matters that cannot be resolved, such as the Bukit Mabong road, will be included in the Twelfth Malaysia Plan. If not in Rolling Plan 1, perhaps we will include it in Rolling Plan 2. Thank you Mr Speaker.

Chow Kon YeowDAP · PHBatu Kawan · questionEN

2. Tuan Chow Kon Yeow [Tanjong] asked the Minister of Housing and Local Government to state whether the Federal Government's approach in ensuring the supply of Affordable Homes (RMM) to all states, including Penang, is adequate, given that the PR1MA programme is no longer being continued now. Provide details of the compensation paid to developers who were unable to continue PR1MA projects due to various factors.

Puan Hajah Zuraida binti KamaruddinPKR · PHMinister of Housing and Local Government · AmpangEN

Bismillahi Rahmani Rahim. Alhamdulillah. Thank you Honourable Member for Tanjong. [Laughter] Thank you. So, for the information of the Honourable Member for Tanjong, at this time the planning for affordable homes for the whole country, we have– in planning from 2018 until now, 30 June 2020, we have planned a total of 546,755 units of housing, of which 193,337 are under construction and 55,496 have been completed and 327,922 are still in planning.

Puan Hajah Zuraida binti KamaruddinPKR · PHMinister of Housing and Local Government · AmpangEN

So, this is to ensure that this is the Federal, state and private level, we bring together. For the information of the Honourable Member for Tanjong, the issue of affordable homes, insya-Allah, we will be able to implement. So far, in the two years from 2018 to 2020, we have achieved nearly 200,000 units of housing, of which 55,000 have been completed, and 150,000 units are currently under construction and insya-Allah will be completed in stages starting from the beginning of 2021. So for PR1MA, indeed our PR1MA has carried out a rationalisation programme, under which in 2016 there was no longer any allocation given to PR1MA. Therefore, the Ministry of Housing and Local Government (KPKT), which now has PR1MA under its purview, with permission, KPKT has carried out a rationalisation programme, in which we have followed the directive from 2018 at that time, for projects below 15 per cent we reviewed again and we stopped these projects. For projects beyond that, we continue construction. Of the 92 projects under PR1MA, 32 projects we stopped, and the rest we continue in stages and we make different plans or models. Whether we migrate the programme to People's Housing Programme (PPR) homes, which also fall under KPKT, whether we undertake joint ventures and change the business model, that is in our existing exercise under PR1MA. To ensure that good land will be more productive, land that is less good we will stop discussions or we are ready to discuss to give compensation, thank you.

Tuan Chow Kon YeowDAP · PHTanjongEN

Thank you. Supplementary question to the Honourable Minister. Can the Honourable Minister tell this House, up to now how many billions of ringgit have been spent on the PR1MA Programme? How many more billions of ringgit need to be spent in order to settle all the debt burdens and responsibilities to developers and buyers of PR1MA housing? Which ministry will finance it?

For the information of the Honourable Member for Tanjong, at this time we have 17 out of 32, with permission, 17 for which we have given compensation based on pre-development, construction costs, interest on delays and so on, totalling RM172 million, while the rest are still under negotiation. So, for these too, we have succeeded in reducing the claims by 30 per cent. So, we have spent RM172 million for 17 pieces of land. So, for the others, we no longer request allocation from the Federal Government to manage the debt and further financing. So, we cut losses, we sell the existing houses, we cover the debt again, and insya-Allah by 2023 we will be able to ensure that all PR1MA debts can be paid, and we will use productive lands to build new houses and carry out migration programmes and also work together with JPN under KPKT, SPNB and so on. This is because the three housing agencies or four housing agencies have been placed under KPKT – PPAM, SPNB, JPN and also PR1MA, which makes it easier for us to cross business models to maximise whatever we have, cut losses and bring back the money. Insya-Allah, thank you.

Mohd Fasiah bin Mohd FakehUMNO · BNSabak Bernam · questionEN

3. Dato' Haji Mohd Fasiah bin Haji Mohd Fakeh [Sabak Bernam] asked the Minister of Higher Education to state the number of graduates who have joined the Economic Recovery Plan (PENJANA) Ministry of Higher Education–Career Advancement Programme (KPT-CAP), state the fields of study and the number of companies that support this programme, and state the number of graduates expected to get employment after completing this programme.

Dato’ Mansor bin OthmanPKR · PHDeputy Minister of Higher Education · Nibong TebalEN

Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera. Thank you Mr Speaker and thank you Honourable Member for Sabak Bernam for raising the question regarding the implementation of the KPT-CAP Programme, which is related to the issue of graduate employability. Mr Speaker, the government has introduced the Economic Recovery Plan (PENJANA) initiative as a stimulus measure to address the current economic situation and to ease the burden borne by the people. There are 40 initiatives worth RM35 billion under PENJANA. Of this amount, the Ministry of Higher Education has been allocated RM100 million for the purpose of enhancing graduate employability under, with permission, the career advancement programme or PENJANA KPT-CAP. Up to 3 December 2020, a total of 87 programmes have been approved for implementation, involving synergy with 154 training provider companies and companies that issue, with permission, letters of commitment as a guarantee of job placement for graduates after training. Based on the number of programmes that have been approved, a total of 7,596 graduates will benefit from them, and of that total, the breakdown by cluster or field of programme is as follows: (i) Place and Train cluster – a total of 6,296 graduates are expected to obtain job placement as soon as they successfully complete their training; (ii) entrepreneurship cluster – 1,010 graduates who successfully complete their training will be offered business financing if they meet the stipulated conditions; and (iii) gig economy cluster – 290 participants will be guided to generate their own income through freelancing as soon as they complete their training. To support the implementation of this KPT-CAP Programme, Mr Speaker, the Ministry of Higher Education has taken the initiative to develop a portal to facilitate graduates and prospective graduates in obtaining information on employment and training, namely the Graduates Reference Hub for Employment and Training (GREaT), with permission. This portal is an information hub for graduate employability that provides various information on employment, entrepreneurship, opportunities for further study, financing, skills upgrading training as well as various career tips to graduates. GREaT is also a platform for graduates to submit proposals or ideas to the government to help graduates improve their employability. That is all, thank you Mr Speaker.

Thank you to Mr Speaker, thank you to the Honourable Deputy Minister who gave the reply just now, and thank you for giving serious attention to graduates across Malaysia. A study has estimated that 2.4 million people will lose their jobs, and graduates are expected to find it very difficult to get employment throughout 2020 to 2021. My supplementary question is, what are the government's measures to ensure that the quality and employability of graduates, as well as the mismatch between the demand by industry and the supply of graduates produced by higher education institutions at present, can be addressed, particularly in the current COVID-19 pandemic situation? That is all, thank you.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

Thank you Mr Speaker, thank you Honourable Member for Sabak Bernam for that supplementary question. To address the issue of graduate employability, I agree with the Honourable Member just now. Indeed this is the issue that has become very big after this COVID-19 pandemic. Several measures have been taken by the ministry. First, as mentioned earlier, with the implementation of KPT-CAP, and secondly, to still remain relevant and competitive in the employability world now. Therefore, we are drafting programmes or policies under IR4.0. The ministry is also planning to implement KPT-PACE. Next, the private higher education institutions (IPTS) themselves, the government has also allocated RM50 million to help graduates from IPTS. In addition, Mr Speaker, there are also several financial assistance programmes that have been introduced for students. Next, there is also an employment implementation programme with the Social Security Organisation (PERKESO), namely the MyFuture Jobs Portal Programme, and also today we are giving special attention to this matter regarding the implementation of the Entrepreneurship Development Programme carried out by the KPT.

Dato’ Mansor bin OthmanPKR · PHNibong TebalEN

Lastly, under this implementation programme there are two programmes being carried out. One with TEKUN Nasional, namely KPT-MEDAC Siswapreneur, and another with the National Entrepreneur Corporation Berhad (PUNB) agency. Thank you Mr Speaker.

Mohamad bin SabuAMANAH · PHKota Raja · questionEN

4. Tuan Haji Mohamad bin Sabu [Kota Raja] asked the Minister of Finance to state the current position of the nation's debt and the ratio of national debt to Gross Domestic Product (KDNK).

Tuan Mohd Shahar bin AbdullahUMNO · BNDeputy Minister of Finance II · Paya BesarEN

Bismillahir Rahmanir Rahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, thank you Honourable Member for Kota Raja. For the information of the Honourable Member, the Federal Government's debt at the end of September 2020 recorded RM874.3 billion or 60.7 per cent of the country's KDNK. However, based on the calculation of statutory limits under Act 275 and Act 637, the ratio of Federal Government debt covering the instruments of Malaysian Government Securities (MGS), Malaysian Government Investment Issues (MGII) and Malaysia Islamic Treasury Bills (MITB) is only 56.6 per cent of KDNK, which is less than the new 60 per cent limit set under Akta 830, Akta Langkah-langkah Sementara Bagi Pembiayaan Penyakit Koronavirus 2019 (COVID-19). Honourable Member, taking into account all existing liabilities, the overall debt and liability exposure of the government is estimated at RM1,257 billion or 87.3 per cent of KDNK at the end of September 2020. For the information of Mr Speaker and Honourable Members, the government is committed to ensuring that the refinancing of Federal Government debt is carried out in an orderly manner according to schedule. In the current crisis situation of the COVID-19 pandemic which is still prolonged, the government will focus earnestly on economic recovery, especially to safeguard the health of the people and support business activities. Once the economy recovers, Honourable Member, the government will re-implement fiscal consolidation measures in an effort to ensure the level of Federal Government debt and liability exposure remains controlled and managed. These measures include broadening the revenue base, strengthening tax administration and compliance, and improving spending efficiency to control the level of the government's fiscal deficit. Therefore, Honourable Member, the government's borrowing needs can be reduced and, in turn, this will control the Federal Government's debt and liability exposure. Thank you Honourable Member.

Tuan Mohamad bin SabuAMANAH · PHKota RajaEN

Mr Speaker, supplementary question. Following the credit downgrade by Fitch Ratings of Malaysia from A to BBB+ as a result of the instability of the current Malaysian Government, is the government proposing again to impose GST on the people next year in order to increase revenue. Thank you.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Thank you, Honourable Member for Kota Raja. Mr Speaker, this question is indeed a very important one, and it is right that the Ministry of Finance provide some explanation in this august House. For the information of the Honourable Member, when Budget 2020 was announced in 2019, we estimated an oil price of only USD60 per barrel at that time, but what happened, due to the COVID-19 pandemic, is that the oil price fell to the level of USD40, and our deficit when we estimated Budget 2020 was within calculation. Our expectation for 2020 was supposed to be a 3.2 per cent fiscal deficit, and when we announced Budget 2020 in 2019, our fiscal deficit was 3.4 per cent. However, returning to the question raised by the Honourable Member, this crisis is not a crisis caused by internal factors or the fundamentals of the economy within the country. What we have established, what we have seen in the improving performance of the elements, does not in fact show a downgrade from A to BBB+ as mentioned by the Honourable Member just now, which is not due to internal economic factors. This is because there are many indicators. For example, Malaysia's position among the most competitive countries in the region is twelfth place in the Doing Business Report. However, returning to the Honourable Member's question on whether we will implement the GST or not, for the information of the Honourable Member, we at the Ministry of Finance are studying various elements, because at this moment, at this time, we are focusing on three things: protecting the health of the people, safeguarding the continuity of the economy, and we want to ensure economic resilience, and reintroducing the GST is not our latest option. We will study all of them. That is why the Honourable Member can see that in the budget announced by the Honourable Minister of Finance, we have focused a great deal on other measures, such as strengthening the enforcement of the MATF or multi-agency task force in order to reduce leakages of national revenue. This is because this too can contribute to national revenue. For the information of the Honourable Member, finally, we are also implementing the way forward, the structural reform measures as the Honourable Member mentioned earlier; we are indeed drafting how we want to expand national revenue, and we will also implement higher governance. This is because for us, what is important is governance. That is why the Honourable Minister of Finance is very committed to us enacting an Act named the Akta Tanggungjawab Fiskal to improve the management and investment of fiscal matters. Thank you, Honourable Member.

Sabri bin AzitPAS · PNJerai · questionEN

5. Tuan Sabri bin Azit [Jerai] asks the Senior Minister of Education to state the continuation of Jawi script, which has been removed at the Sijil Pelajaran Malaysia level, whereas Jawi-related courses are provided at the Institutions of Higher Learning.

Tuan Muslimin bin YahayaBERSATU · PNDeputy Minister of Education II · Sungai BesarEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Thank you, Mr Speaker, and thank you to the Honourable Member for Jerai. For the information of the Honourable Member, at present, the skills of reading and writing Jawi in secondary schools are still given emphasis through the teaching and learning (PDP) of Islamic Education. The use of Jawi script in the textbooks for the subject of Islamic Education from Form One to Form Five also aims to strengthen students' mastery of Jawi. Up to now, the skills of reading and writing Jawi are still tested in the Form 3 Assessment (PT3) in the subject of Islamic Education. Apart from the subject of Islamic Education, the subjects of Islamic Syariah Education and Al-Quran and As-Sunnah Education fully use Jawi, including in examination questions. For the information of the Honourable Member as well, the element of strengthening Jawi among students is implemented through enrichment activities such as developing the Jawi Remedial Module in a simpler and more engaging way for students who have less mastery of Jawi. Some schools implement Jawi Remedial Camps for secondary school students. In addition, there are also schools that organise co-curricular activities to instil students' interest in Jawi. The Ministry of Education Malaysia is confident that the approach used so far is able to sustain the continuation of Jawi script at the secondary school level. Thank you, Mr Speaker.

Tuan Sabri bin AzitPAS · PNJeraiEN

Thank you, Honourable Deputy Minister, for the answer given. Mr Speaker, as we are well aware, the government introduced Jawi script in the Malay Language subject in primary schools in 2019, and this matter has met with opposition from various parties. In my view, learning Jawi script in the Malay Language subject does not affect the ethnic identity of the pupils who learn it. We received information that only 2.9 per cent of the total national-type schools (SJK) agreed to implement the use of Jawi script for Year Four pupils in 2020. For SJK Cina, 2.77 per cent of 1,299 schools agreed with the implementation, while for Sekolah Jenis Kebangsaan Tamil, only 0.2 per cent of 525 schools agreed with the implementation. Accordingly, I would like to know, Mr Speaker, whether the Ministry of Education (KPM) will continue the learning of Jawi script in the Malay Language subject in primary schools. Will the number of pages for learning Jawi script in the Malay Language textbook remain at three pages for 2021? That is all.

Tuan Muslimin bin YahayaBERSATU · PNSungai BesarEN

Mr Speaker, thank you to the Honourable Member for Jerai. Although it is still on Jawi script, it has deviated somewhat from the original question. Nevertheless, I would like to share that we at the Ministry of Education Malaysia follow the Cabinet decision dated 14 August 2019, which decided that the introduction of Jawi script should continue to be implemented in national schools and national-type schools.

Tuan Muslimin bin YahayaBERSATU · PNSungai BesarEN

This is the decision made by the Cabinet, and we at KPM, in principle, simply follow the directive issued by the Cabinet. So, for the information of my friend the Honourable Member for Jerai, in fact, Jawi script, as it is being portrayed – we are not teaching our students to write, nor are we teaching our students to read in relation to Jawi script. We are only in the process of recognition. We do not teach them about alif, ba, ta, the 30 letters, including combining vowels and consonants in Jawi script, but we only provide recognition. For example, I would like to give an example: on our currency there is Jawi script on the back. So, the recognition process, if we look, ladies and gentlemen, in the Jawi script that we introduce to Level Two students, Year Four, beginning in 2020, is only recognition. For example, on our currency, Bank Negara Malaysia and Ringgit Malaysia are written in Jawi script. So, it is a recognition process that they need to learn. So, my friend the Honourable Member for Jerai and the other Members of Parliament, we at KPM respect the decision made by the Cabinet dated 14 August 2019, and for us, Jawi script is part of the art of language, and we want our people to further enrich the heritage, and we hope that knowledge of the art, heritage and history of the Malay language will continue to be passed on to our students. Thank you, Mr Speaker. Thank you, Honourable Member.

Tuan Sabri bin AzitPAS · PNJeraiEN

Thank you, Honourable Minister.

Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah Pantai · questionEN

6. Ahmad Fahmi bin Mohamed Fadzil [Lembah Pantai] asks the Minister of Science, Technology and Innovation to state the current status of the preparation of the COVID-19 vaccine for Malaysia, and when it is expected to begin to be given to the people.

Tuan Khairy Jamaluddin Abu BakarUMNO · BNMinister of Science, Technology and Innovation · RembauEN

Peace be upon you, the mercy and blessings of Allah, and greetings of peace. Mr Speaker, allow me to answer this question together with the questions that have touched on the same issue today from the Honourable Member for Ledang, the Honourable Member for Marang, the Honourable Member for Kota Raja, the Honourable Member for Kuala Kedah, as well as the questions from the Honourable Member for Hang Tuah Jaya and the Honourable Member for Hulu Selangor on 15 December. For the information of the Honourable Members, as announced previously, Malaysia has set a target of 70 per cent of the country's total population for the formation of Herd Immunity under the National Vaccination Plan for the COVID-19 disease. Up to now, Malaysia has signed two agreements that guarantee a vaccine supply of 30 per cent of the country's total population. The first agreement is with the COVAX facility through the Optional Purchase Agreement, signed on 23 November last year, which guarantees a vaccine supply of 10 per cent of the country's population. Meanwhile, the second agreement is an advance purchase agreement with the pharmaceutical company Pfizer, concluded on 24 November, to obtain a vaccine supply of 20 per cent of the country's population. To achieve the remaining balance of the 40 per cent target, the government is still in the process of discussions and negotiations with other pharmaceutical companies developing COVID-19 vaccines. As for the vaccination of the people, the government targets the first quarter of 2021 to obtain the first batch of COVID-19 vaccine supply. It is emphasised that the government will not compromise on the safety and effectiveness of any vaccine. The final decision on the use of any vaccine in Malaysia will only be made after going through the registration and approval process by the National Pharmaceutical Regulatory Division (NPRA) under the Ministry of Health. Thank you.

Mr SpeakerEN

Thank you, Honourable Member. Please proceed with supplementary questions.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Thank you, Mr Speaker. Thank you, Honourable Minister, for the answer. On 4 December last, the newswire Reuters reported that there is a supply chain problem for the pharmaceutical company Pfizer in providing the required amount, their target for the vaccine in 2020. We see here in the government's calculation that Pfizer will provide 20 per cent of the requirement. What are the government's plans if the Pfizer supply chain problem continues into 2021, its impact, and what is the government's preparation, considering that the differences in this vaccine are not only difficult for Malaysians to understand but also in terms of conditions, with permission, such as transport and so on. What are the government's plans, and what is the expected additional cost apart from the RM3 billion that was mentioned previously? Thank you.

Thank you, Honourable Member. I am also aware of the news regarding the problem of the supply chain of the pharmaceutical company Pfizer. However, the same media report states that the problem only affects the supply for the year 2020. As far as I know, what Pfizer has informed us does not affect their supply for next year, which is the supply for the Malaysian government. Nevertheless, if any disruption occurs to the supply chain, that is precisely why Malaysia, like other countries, is taking the approach of acquiring a vaccine portfolio. Not from one company but from various companies, to ensure that we get sufficient supply. If we only get it from one company, that might expose us to the risk of receiving insufficient vaccines. With regard to the ancillary costs, namely the cost of logistics provision and so on, there is an agreement with Pfizer whereby the cost we pay for one vaccine dose covers the transport cost, or the cost of conveyance, which will be paid or borne by Pfizer itself. That depends on the agreements with the different companies. The final cost we are still examining, because certainly it is not only the transport cost but also the storage cost that we will scrutinise, and we will inform you when we have certainty. Thank you.

Robert Lawson ChuatPBB · BNBetong · questionEN

7. Datuk Robert Lawson Chuat [Betong] asks the Minister of Finance to state: (a) what is the total allocation approved for the Long House Loan Scheme from the Federal Government for Sarawak for 2020; and (b) whether the government intends to increase that fund in view of the growing demand from the Sarawak longhouse community for the loan scheme.

Tuan Mohd Shahar bin AbdullahUMNO · BNDeputy Minister of Finance II · Paya BesarEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, the mercy and blessings of Allah, and greetings of peace. Mr Speaker, thank you to the Honourable Member for Betong. For the information of the Honourable Member, in 2020 the Ministry of Finance channelled an allocation totalling RM10 million to the Sarawak State Government to help finance the Sarawak Long House Loan Scheme programme. Up to now, the Federal Government has channelled an allocation totalling RM152.5 million to the Sarawak State Government under this programme, and a total of 8,915 longhouse doors have been successfully built and rehabilitated. For the information of the Honourable Member, any future need to increase the allocation provided to the Sarawak Long House Loan Scheme programme depends on the financial capacity and position of the Federal Government. Nevertheless, Honourable Members, the Federal Government welcomes it if the Sarawak State Government also helps contribute funds to this loan scheme programme, as it is one of the Infrastructure and Socio-Economic Development projects that directly benefit the residents of the state of Sarawak. Thank you, Mr Speaker.

Mr SpeakerEN

Thank you. Supplementary question.

Datuk Robert Lawson ChuatPBB · BNBetongEN

Thank you, Honourable Deputy Minister. How many longhouses have been built or rehabilitated in the Betong Parliamentary constituency for 2020 using the Long House Loan Scheme, considering that rural residents in Sarawak who live in longhouses face difficulties in obtaining loans from financial institutions? Does the government intend to provide this allocation as an annual programme? That is all, thank you.

Mr Speaker

Silakan.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

Mr Speaker, thank you to the Honourable Member for Betong. For the information of Mr Speaker and the Honourable Member for Betong, I arrived in Betong approximately four months ago. I have seen the Betong area, five hours from the city of Kuching. I am confident that what the Honourable Member for Betong has raised is very accurate and is indeed a basic need. That is why in 2020, the Sarawak State Government through the Sarawak Housing Development Corporation (HDC) approved a loan totalling RM10.1 million with a target of new construction and renovation for 340 longhouse doors throughout the state of Sarawak. So, of that total, Honourable Members, a sum of RM414 thousand in loans was approved for the purpose of construction and renovation involving 15 longhouse doors in Sungai Pelandok Paku Sepauh in the Betong Parliamentary constituency. For the information of the Honourable Member, the grant that the government has given since 2006 is a grant, not a loan.

Tuan Mohd Shahar bin AbdullahUMNO · BNPaya BesarEN

That is why, Honourable Member, we take into account the circumstances and financial position of the country. For the information of the Honourable Member, in 2021, the government announced in the Budget the other day that RM10 million is allocated for the state of Sarawak and RM10 million for the state of Sabah. For the information of the Honourable Member, the loan that we impose or— the Federal Government channels allocations in the form of grants, and it is the state government that gives loans to those who have a salary between RM650 and RM3,000. For the information of the Honourable Member, the interest rate imposed on the loan is roughly three per cent, or only about RM65 to RM70 per month that they have to pay. Insya-Allah, Honourable Member, your views, the Ministry of Finance will consider them for the following years. Thank you, Honourable Member.

Yeo Bee YinDAP · PHPuchong · questionEN

8. Puan Yeo Bee Yin [Bakri] asks the Minister of Energy and Natural Resources to state the current status of the transfer of Sabah Electricity Sdn. Bhd. (SESB) from the Federal Government to the Sabah State Government, and whether the Report of the Committee for Planning and Implementation of Electricity Supply and Tariff (JPPPET) for Peninsular Malaysia and Sabah will be published to the public.

Tuan Ali anak BijuBERSATU · PNDeputy Minister of Energy and Natural Resources · SaratokEN

Good morning and greetings of peace. Thank you, Mr Speaker. Thank you, Honourable Bakri. For the Honourable Member's information, the Federal Government is committed to proceeding with the transfer of electricity supply powers and Sabah Electricity (SESB) to the Sabah State Government, and will begin negotiations after obtaining the latest direction on this transfer from the new Sabah State Government administration. For the purpose of the negotiations, a steering committee and a technical committee will be established. The transfer process is expected to take a long time because it involves legal, financial and technical aspects for the Federal Government as well as the Sabah State Government. From the legal aspect, several actions must be carried out before the legal power over electricity supply is given to the Sabah State Government through the gazetting of an order under Article '94C' of the Federal Constitution. Among them are amendments to the Renewable Energy Act 2011 and the Sustainable Energy Development Authority Act 2011 by the Federal Government, the enactment of state laws relating to Sabah's electricity supply, and the determination of the application of federal acts relating to Sabah's electricity supply. From the financial aspect, several matters need to be given attention, especially regarding the sustainability of SESB in providing a viable electricity supply to the people of Sabah. This is because the Sabah State Government must take over responsibility for ensuring the sustainability of SESB after the transfer is carried out. For example, at present, the Federal Government provides an annual subsidy allocation to SESB of around RM700 million a year. This responsibility must be taken over by the Sabah State Government when the power over electricity supply is transferred later. From the technical aspect, the Sabah State Government must prepare for the establishment of a new regulatory body to take over the industry regulatory functions of the electricity supply industry in Sabah from the Energy Commission and the functions of the Sustainable Energy Development Authority (SEDA), before the order under Article 95C of the Federal Constitution is gazetted. Therefore, the transfer of power over Sabah's electricity supply and SESB will only be carried out after all of these, namely after the policy, economic, technical and operational issues and the legislative work timeline have been finalised. The Federal Government expects the transfer process to take at least five years. For the information of the Honourable Member, regarding the second question, the government, through the Energy Commission, will continue the practice of publishing the Generation Development Plan agreed at the Tariff Electricity Supply Planning and Implementation Committee (JPPPET) meeting for Peninsular Malaysia and Sabah to the public after it has been approved by the Cabinet. Thank you.

Puan Yeo Bee YinDAP · PHBakriEN

Thank you, Mr Speaker. Mr Speaker, it is now December, you see. The Ministry of Energy and Natural Resources has to make several decisions, among them, the first is whether the government has decided on the base tariff based on the incentive pays regulation for regulatory period number three. Second is Net Energy Metering, which will also end in December. So, I would like to ask the Honourable Deputy Minister for an explanation: will the decision be taken and will the announcement be made as soon as possible?

Tuan Ali anak BijuBERSATU · PNSaratokEN

Thank you, Honourable Bakri, for the supplementary question. The Ministry expects that the Peninsular Generation Development Plan for the year 2020 will be displayed on the Energy Commission's website in January or February 2021. Thank you.

Puan Yeo Bee YinDAP · PHBakriEN

Mr Speaker, the Honourable Deputy Minister has misunderstood my question. My question concerns regulatory period number three, namely in our planning, in January we will start regulatory period number three. When will the announcement be made? Because industry players are waiting. And also with Net Energy Metering as well. All of these are related to electricity planning such as the JPPPET.

Tuan Ali anak BijuBERSATU · PNSaratokEN

The original question just now concerned the transfer of powers to Sabah. So for the supplementary question, I will answer in written form.

Puan Yeo Bee YinDAP · PHBakriEN

Mr Speaker, this is very important for the electricity industry and also for industry players. They need to know what their base electricity tariff will be, because in December they make plans for their business.

Mr SpeakerEN

Yes, Honourable Member. The Ministry...

Puan Yeo Bee YinDAP · PHBakriEN

And also Net Energy Metering as well. If possible, let us set a target date on which the announcement will be made.

Mr SpeakerEN

Honourable Deputy Minister, you are requested to answer in writing as soon as possible, yes. Thank you.

Zakaria bin Mohd EdrisUMNO · BNLibaran · questionEN

9. Datuk Zakaria bin Mohd. Edris @ Tubau [Libaran] asks the Minister of Science, Technology and Innovation to state what the ministry's efforts are to seize the opportunity in a crisis such as the present to harness technology in terms of creativity and innovation.

Tuan Khairy Jamaluddin Abu BakarUMNO · BNMinister of Science, Technology and Innovation · RembauEN

Mr Speaker, the pandemic that has struck the world has forced all of us to harness technology in daily life. Recognising this importance, the Ministry of Science, Technology and Innovation (MOSTI) has implemented several initiatives in the aspect of promoting innovation and technology development involving stakeholders such as researchers, companies, entrepreneurs, start-ups and businesspeople. Last August, the National Technology and Innovation Sandbox initiative was launched with a fund of RM100 million as a solution-oriented policy plan to accelerate the creation, adoption and commercialisation of high technology and local innovation. Meanwhile, in September, MOSTI introduced the Social Impact Matching Grant amounting to RM10 million to support social enterprise and innovation in bringing solutions to the community, and this was followed by the MYHackathon programme, which focuses on improving digital-based government service delivery systems. These initiatives are a platform to showcase the results of innovation by giving space to the people, youth, start-ups, researchers and companies to jointly create innovative solutions, including in the fields of health, agriculture, manufacturing and government services. As a result, there are several technology-based solutions that have been funded for development or have been applied, such as the IOT emergency mechanical ventilator, semi-ventilator, IOT platform with thermal vision for assisted living, COVID-19 screening booths, farm assisted robot for multi-operation and the MCK 19 delivery robot used in hospitals. Besides that, the government has also established the Digital Economy Task Force (DETF), co-chaired by the Minister of Communications and Multimedia and the Minister of MOSTI. Through this DETF, 15 workstreams have been created that cut across various ministries and agencies for the purpose of coordinating the implementation of various digital economy initiatives, especially initiatives to drive economic recovery that has been severely affected by the COVID-19 pandemic, based on the main pillars of the National Economic Recovery Plan (PENJANA). Thank you.

Thank you, Mr Speaker. Thank you, Honourable Minister. We are well aware that when speaking about science and technology, allow me to touch briefly on STEM, namely science, technology, engineering and mathematics. I understand that this field is not under the purview of MOSTI. However, MOSTI is also one of the parties with a stake in the development of STEM, especially during this COVID-19 period.

My question is that I ask the Honourable Minister to explain how MOSTI can play a role in ensuring the development of this component in order to produce young generations with high skills and in solving these complex problems? What are the government's efforts in propelling the nation to face the challenges of Industry 4.0 and in producing human capital skilled in this field of technology? Thank you, Mr Speaker.

Thank you to the Honourable Member from Libaran for this very important question, as the provision of talent in the STEM field is shared not only by MOSTI but also with other ministries, including the Ministry of Education, the Ministry of Higher Education, the Ministry of Human Resources and others too. Nevertheless, under MOSTI we have the cultivation of STI, or the cultivation of Science, Technology and Innovation, and our main programme in this regard is the National Science Week, which we hold on a large scale. This year we were forced to hold it virtually. Nevertheless, it was still carried out, and under this programme we have the Model Science Development Design Programme, the Virtual Science Challenge, the National Space Challenge, and the total participation this year was 1 million. The total engagement recorded through "view" engagement was 2.7 million, consisting of school students, higher education students, educators, scientists and so on. Apart from that, in the 2021 budget, announced by the Honourable Minister of Finance, two new programmes were announced, the first of which is the "Malaysian Techlympics". This is a national-scale competition in which youths, teenagers, students and researchers will also take part in competitions based on technology and applications such as IoT Robotics, Drones and Artificial Intelligence (AI). Also the announcement of Ruang Reka, namely the Science Space, which we will establish in rural areas and suburban areas to further increase the interest of young people, especially in STEM. Thank you.

William Leong Jee KeenPKR · PHSelayang · questionEN

10. Tuan William Leong Jee Keen [Selayang] asks the Minister of Housing and Local Government to state the reasons why KPKT appointed Local Council Members and Chiefs of Kampung Baru Cina, when both appointments were legally made by the state authority.

Puan Hajah Zuraida binti KamaruddinPKR · PHMinister of Housing and Local Government · AmpangEN

In the name of God, the Most Gracious, the Most Merciful, praise be to God, thank you to the Honourable Member for Selayang. For the Honourable Member for Selayang's information, KPKT did not make any appointment of Local Council Members, so for the Honourable Member for Selayang's information, KPKT appointed Village Development Officers (PKP), and these Village Development Officers carry out coordination duties for all 613 Kampung Baru Cina throughout the country. So, the programmes coordinated by the PKP include the programmes and applications made by the Chiefs of Kampung Baru Cina nationwide according to their respective zones. They have their own zones, and the purpose is to coordinate applications such as: (i) Physical Development Applications, (ii) House Repair Applications, (iii) Special Grant Assistance Programme for residents, especially in these Kampung Baru Cina. The PKP coordinates, in terms of applications for allocations and so on, to obtain approval at the KPKT level. So, because this allocation comes from KPKT. Therefore, most of the programmes implemented are infrastructure programmes, including roads, drains, ditches, lamp posts, pedestrian walkways, walls and plazas. These socio-economic facilities are in terms of physical development. In terms of the House Repair Assistance Programme, it is for repairing houses such as roofs, eaves, ceilings, windows, doors, water pipes, electrical wiring, toilets, bathrooms, staircases, kitchens; these are from the House Repair category. Another is for the management of the special grant through Bank Simpanan Nasional for personal loans. So, this appointment of PKP made by KPKT can be compared to a traditional village having a Village Head and a penghulu. So, are these PKP like penghulu for the Kampung Baru Cina? Thank you.

Tuan William Leong Jee KeenPKR · PHSelayangEN

My supplementary question is why this allocation cannot be channelled to the Village Heads who have been appointed by the state authority? Also, regarding what is called the Federal Council Member, why was this also appointed, when we also have council members who have been appointed by the state authority? Thank you.

I wish to emphasise again that KPKT did not appoint Local Council Members, there is no such post, Honourable Member for Selayang. So the allocation just now, each Village Head is indeed given an allocation of RM100,000 to apply for physical applications and also house repairs. However, the channel is indeed that applications come from the Village Head. Only the coordination is done by the Village Development Officers (PKP), so that is my explanation. Thank you.

Mohd Nizar bin ZakariaUMNO · BNParit · questionEN

11. Dato' Mohd. Nizar bin Haji Zakaria [Parit] asks the Minister of Rural Development to state:- (a) what efforts have been implemented by the ministry to further intensify the marketing of village entrepreneurs' products; and (b) how the ministry will ensure that the efforts implemented will be well received by buyers and consumers in line with the current economic situation.

Dato’ Sri Hj Abdul Rahman bin MohamadUMNO · BNDeputy Minister of Rural Development I · LipisEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Parit. The ministry is always striving to help entrepreneurs to increase marketing through several programmes using various mediums. Firstly, it is online, through a strategic partnership initiative via the Desamall@KPLB platform. This programme helps rural entrepreneurs market their products online through e-commerce platforms such as Lazada, Shopee, eBay, Play Store Mall and GrabMart. As of 30 September 2020, a total of 1,748 rural entrepreneurs have been trained and a total of 21,698 Stock Keeping Units (SKUs) have been uploaded onto the platform by participants of Desamall@KPLB. Next, the ministry has also organised the Village Entrepreneur Carnival online in November and December 2020, eKUD@KPLB. This aims to create buyer awareness of rural entrepreneurs' products that can be purchased online. At the same time, entrepreneurs through physical business premises also continue. One specific business outlet for rural entrepreneurs' products, namely the Rural Business Outlet (RBO), operated by the Ministry of Rural Development (KPLB), began operating at Anggerik Mall, Shah Alam on 2 November 2020. More than 500 types of products from the food, wellness, fashion and craft clusters can be obtained by the public under one roof. Mr Speaker, the ministry assists the marketing of entrepreneurs by opening market access and creating continuous buyer awareness. However, it is the responsibility of the entrepreneurs themselves to take full advantage of this increased awareness to increase sales and gain loyal customers through high-quality products that meet buyers' needs. Thank you, Mr Speaker.

Thank you, Mr Speaker, thank you to the Honourable Deputy Minister. We do acknowledge that our entrepreneurs in rural areas already have certain products, and at the same time, in terms of their markets, the Ministry of Rural Development (KPLB) has indeed provided various forms of facilities, as have other departments or agencies, and this includes especially online, let alone during this COVID-19 period. I would like to ask the Honourable Deputy Minister: among the methods to ensure that village or kampung entrepreneurs' products have quality and consistency is by using machines for the production of their products. So, how does KPLB help entrepreneurs to shift to the use of machines so that their quality, time and also income will continue to improve and increase? Thank you.

Thank you, Mr Speaker. Thank you to the Honourable Member for Parit.

Indeed this question is very interesting, because at the Ministry of Rural Development (KPLB) itself, we have actually implemented programmes through this machinery. Among them is the Rural Entrepreneurship Strengthening Support Programme (SPKLB), in the form of a corporate grant. Where we, the business people, provide 30 per cent of the capital and 70 per cent KPLB will assist through aspects such as the purchase of machines, premises repairs and training. This is indeed what we do, and many have been able to benefit from it. For example, in 2019, a total of 26 entrepreneurs received grant assistance amounting to RM2.02 million. We further assist this grant through more people because, due to COVID-19, we assisted entrepreneurs with a somewhat lower value of RM10,000. However, we were able to help more people, currently a total of 79 people and a total of RM822,218 that we have assisted. Through this, we can also provide loans through the Rural Economic Financing Scheme (SPED) for the purpose of purchasing machines. Among these methods, we have consistent quality and use machines to ensure that KPLB itself can help the entrepreneurs mentioned by the Honourable Member for Parit just now. Thank you, Honourable Member for Parit.

Mr SpeakerEN

Honourable Members, the session for Oral Questions for today has now ended. Thank you, all Honourable Members. [End of Oral Questions session]

Bill — Supply Bill 2021 and Development Estimates Motion 2021 CommitteeBill

The Order of Business was read to resume consideration of the "Supply Bill 2021 and Development Estimates 2021 in the Committee of the Whole House." [Fifth Day] [The House sits in Committee] [Mr Speaker presides over the Committee]

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Mr Chairman, Mr Chairman, the Honourable Member for Padang Serai asks for a little more time because we have been unable to debate for a long time.

Mr ChairmanEN

We have set the time and I will give it as usual. However, Honourable Member for Padang Serai, that was actually the Chief Whip's decision, not mine. Sorry, okay.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Every day we come, we never get the chance to debate. Only five minutes, and even that we could not get. In the constituency, the people are very angry, it is not that they don't notice.

Mr ChairmanEN

I will try. Yes, that is up to the Chief Whip.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Okay, thank you.

Mr ChairmanEN

Thank you. As the first debater, I would like to invite the Honourable Member for Kota Raja. Oh, sorry, sorry...

Tuan Mohamad bin SabuAMANAH · PHKota RajaEN

Mr Chairman, I would like to touch on Item 020000...

Mr ChairmanEN

Sorry, Honourable Member, I have not yet mentioned which Head.

–

Kepala P.27Anggaran Pembangunan 2021

–

Mr ChairmanEN

Honourable Members, Supply Head B.27 and Development Head P.27 under the Ministry of Works are now open for debate. I invite the Honourable Member for Kota Raja. Sorry.

Tuan Mohamad bin SabuAMANAH · PHKota RajaEN

I thought I had already invited him just now. [Laughter]

Mr Chairman

[Ketawa]

Tuan Mohamad bin SabuAMANAH · PHKota RajaEN

Item 024000 – Road Infrastructure Development and Construction Industry Development. My question was answered in writing, concerning the condition of the roads leading to Port Klang, where it was found that 30 per cent of the vehicles using those roads carry overloads. I would like to suggest that it has indeed been done, but that emphasis was placed on the type of asphalt, the type of tar or the type of stone used, for at least a 20-kilometre radius around Port Klang and leading to Port Klang. This is because these heavy vehicles, when they slip even slightly off the road shoulder, will damage the vehicle and damage the road itself. [Deputy Speaker (Dato' Mohd Rashid Hasnon) chaired the Committee] When congestion occurs, drivers usually use Waze or Google, and they look for shortcuts to reach their destinations. Therefore, they use garden roads and housing estate roads that are entirely unsuitable for heavy vehicles to pass through in those areas. Therefore, the ministry should conduct a comprehensive study. I am not asking for it to be completed next week or next year, but a long-term study, especially under the Twelfth Malaysia Plan (RMKe-12), so that sufficient allocation is provided for conducting the study. So that road repairs do not have to be carried out too frequently and cause severe congestion on the way to Port Klang. Whether it is from the direction of Klang, the direction of Kota Raja, or the direction leading to Port Klang from Banting. All three routes carry very many large vehicles, and this is dangerous to the public in that area. Therefore, the standard road that is used needs to be built, at least as I mentioned, or in accordance with the study by the engineers there. I say, at least 20 kilometres around Port Klang should have good concrete roads for smoother travel. This is because Port Klang, as I mentioned just now, is because the world's development is now moving towards the East or Timur, so Port Klang will become the main port in the future and is already competing with Singapore itself. Therefore, the costs borne now for road damage, if that cost were used for research, we could reduce damage in the future. Enforcement also needs to be emphasised now, so that those who use Waze and Google Maps do not look for shortcuts to reach their destinations. They enter village roads that are completely unsuitable for vehicles such as containers and the like. They disturb the gardens and are dangerous to traffic in that area. Therefore, this can be a matter of concern, because Port Klang is the lifeline of the country's development or economy now and in the future. That is my view, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Kota Raja. Now I invite the Honourable Member for Tanjong Manis, five minutes. Is there no Honourable Member for Tanjong Manis? I invite the Honourable Member for Jerantut.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Mr Chairman, for giving me the opportunity to also take part in the debate at the Committee stage for the Ministry of Works (Kementerian Kerja Raya, KKR). I will go directly to Item 020000 – Road Infrastructure Development and Construction Industry Development. I want to focus on Item 020200 – Road Branch. I would like to ask the KKR whether there is any portion of the allocation for maintaining these roads that is given to concession companies to be given directly to G1 class contractors. This is because we have found that there is a practice where these concession companies carry out projects themselves that should have been handed over to G1 class contractors. So, if there is specialisation, this is good for controlling so that the many G1 class contractor companies in these districts receive protection from the government. I would also like to ask the ministry whether the government is prepared, from its allocation, if not all, then part of it, to be distributed directly to the district JKR. This is better and beneficial to the government and also to the implementing contractors. This is because, as we know now, when a particular allocation is passed down to the districts, let us say concession company A receives RM10 million for district road maintenance. They will take an average profit of 15 to 25 per cent. If 20 per cent is taken, the cost is only RM8 million left. Then the implementing company, namely the G1 class, takes another 15 to 25 per cent, we take an average of 20 per cent. Take another 20 per cent, which is RM1.6 million, so what is actually left for the project is only about RM6.4 million. So, of the RM10 million just now, the people's money suffers a great deal of leakage along the way.

Why not, if the government gives it directly to the district JKR. If not all, perhaps part. This is better, more economical and more beneficial to the government. The second point, I want to ask the Ministry of Works under Head 050000 – Special Programmes, whose sub-item is 051100 – Maintenance of Federal Roads in Peninsular Malaysia (Non-Pavement). I want to ask what is the load-bearing limit of the roads throughout Malaysia? This is because, as we see now, there are potholes, patched today, cracked again tomorrow, the day after, and then patched again. We see lorries also carrying fairly heavy loads because the sizes of the lorries differ. So, if we determine their load limit according to the road's endurance, then lorries or vehicles exceeding that load should not be allowed to pass these roads. This is because, when potholed roads are used by large vehicles, it is alright, there is no problem, but for small vehicles, for the people who drive Proton, who drive Perodua, they hit these roads and are thrown about everywhere, causing the cost of repairing their vehicles to be higher. So, if we determine the load limit and ensure there are no vehicles exceeding the load determined for the road's endurance, that is better and more beneficial. Over the same period, it is more beneficial to the government because the repair costs can be saved. I would also like to ask the KKR, recently we learned that the Cabinet has agreed to build our roads from a mixture of cup lump rubber and asphalt, or what is named rubberised road (with permission). How long, I wonder, will the roads that have been allocated be, using the mixture I have just stated? This is because, if this can be increased, at the same time it will increase the capacity of the Ministry of Works to build more durable roads and will also increase the use of natural rubber produced by smallholders throughout Malaysia. Indirectly, it will increase the price of this rubber. So, with the hope that when our roads last a long time, and costs can be saved, we can focus more on the roads that still need to be repaired. There are many more roads, for example in the Jerantut Parliamentary constituency itself, if we look at the Jerantut-Temerloh Road, which is also badly potholed, and the roads from Kuala Krau to Bandar Tun Razak. This causes hardship to the people. So, with the hope that the existing allocation can be continued for the people, rather than being wasted during the implementation stage. Thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Jerantut. Now I invite the Honourable Member for Merbok, followed by the Honourable Member for Setiu.

Thank you, Mr Chairman. I would like to refer directly to Items 050800 and 051000 concerning the repair and maintenance of slopes on Federal Roads in Peninsular Malaysia, and also the maintenance of Federal Roads in Sabah, Sarawak and the Federal Territory of Labuan, where under both of these items the allocation has been removed, that is, nil. I would like to refer to the Audit Report 2018 Series 13, which found that slope inspections had not been carried out for seven years due to a shortage of allocation. Then, the Audit Report also found that slope repair work was carried out on only 497 slopes out of a total of 988 slopes that had collapsed and for which allocation was applied. Meanwhile, for slope prevention work, only 56 slopes, that is 5.9 per cent, compared with a total of 946 slopes targeted. Then the audit review report also found that a company 301524-V was appointed directly through negotiation for a period of three years starting 1 November 2017 until 31 October 2020. The scope of work for this main contractor is to carry out repairs, and the cost of this contractor amounts to RM900 million. However, the actual cost is based on current work requirements. My question is that the audit party also found that the contractor was not capable of carrying out slope prevention work as planned and did not have the capacity to carry out that scope of work. My question is, will the ministry review the performance of that contractor, other than the one appointed, in terms of the contract scope, considering that the contractor's capacity for repair and prevention work will end at the end of 2020. Next, I would like to refer to Item 08250 – Study on Slope Protection/Repair as well. CKC currently still uses slope data updated in 2010. So, with the amount under that item, is it included in this study – which is included in that item. Next, I refer to Item 31000 – Construction of Roads and Bridges amounting to RM384,610,600 million. Is the construction of the Sembeling Jetty Bridge included under this item? Next, Item 51000 – Miscellaneous Construction and Item 90000 – Other Construction. What – I would like to obtain details under those items and to whom the recipients of that allocation are, because the amount is quite high. Finally, Item 81000 – Construction of New Roads (New Projects). I would like to add, as the Honourable Member for Jerantut mentioned, is this allocation inclusive of new roads that use coagulated rubber, namely CMA? Will there be an allocation for building roads using coagulated rubber on a large scale, which will certainly stabilise the rubber price, because if these roads use coagulated rubber, demand for rubber will increase. This is because a study shows that one kilometre of road requires about 4 tonnes of scrap rubber. So, if it is not under this item, is there any item in the KKR allocation that places coagulated rubber or CMA as one of the road surfacing materials. That is all, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Merbok. Now I invite the Honourable Member for Setiu.

Assalamualaikum warahmatullahi wabarakatuh, alhamdulilah [Reciting selawat]. Mr Chairman, referring to Item 030600 – Security Works Branch. There is a study which shows that steel dividers on highways can make an accident worse and can even cause fatal accidents because the dividers cannot absorb the impact. Therefore, the suitability of road dividers must be reviewed to ensure the safety of road users and to minimise injuries to accident victims. For this reason, Mr Chairman, I propose that a comprehensive study be carried out on the use of rolling barrier road dividers, as used in countries with low accident rates such as Sweden and the United Kingdom. Second, Item 050500 – Maintenance and Street Light and Traffic Light Bulbs of Federal Roads. With reference to this item, I would like to touch on the quality of road infrastructure, especially involving the issue of street lights. It cannot be denied that various enforcement measures are implemented by the Royal Malaysia Police (PDRM) to reduce the rate of accidents on the roads, especially during festive seasons. However, problems related to infrastructure need to be given priority, especially street lights that do not work, and there are also roads without light poles. As an example, in the Setiu Parliamentary constituency, the road from Telaga Papan to Bukit Putera, which often leads to fatal accidents because of the dark road. The next item is 051200 – Maintenance of Federal Roads in Peninsular Malaysia. With reference to this item, the maintenance of Federal Roads in Peninsular Malaysia, I request that this allocation be reviewed. This is because the issue of accidents caused by damaged roads, broken roads and potholes is not a new issue. Continuous monitoring is very much needed, and the allocation for district roads is also insufficient, whereas there are many damaged roads, especially during the flood season. The phenomenon of 'air termenung' (stagnant floodwater) or flood water that collects because of the low height of the road, this issue needs to be resolved immediately by raising the level of low roads, especially now that Terengganu is being hit by the northeast monsoon season. Item 050300 – Skills Competition. Based on this item, the allocation in Budget 2021 shows an increase of 30 per cent from the allocation of 2020. Therefore, I request the ministry to provide a clearer explanation about this skills competition, and what the needs and benefits to the people are, to the extent that it requires an allocation of nearly RM2 million.

Item 050800 – Repair and Maintenance of Slopes on Federal Roads in Peninsular Malaysia. Mr Chairman, slopes along roads that are not properly maintained are among the contributing factors to fatal accidents in this country. However, based on Item 050800 – Repair and Maintenance of Slopes on Federal Roads in Peninsular Malaysia, no allocation at all has been provided for that purpose in Budget 2021, compared with RM140 million allocated in Budget 2020. Therefore, I request an explanation from the government as to why this allocation has been removed in Budget 2021? That is all, Mr Chairman, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Setiu. Next, I would like to invite the Honourable Member for Tuaran, followed by the Honourable Member for Pasir Puteh.

Thank you, Mr Chairman. I have submitted a motion under Standing Order 66(9), Mr Chairman, but it was rejected. So, I request that I be given more than five minutes to explain everything. May I, Mr Chairman? Because I have submitted two motions but both were rejected. So, I need to explain why I submitted those motions.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Continue for five minutes first; if additional time is needed, I will later...

Thank you, Mr Chairman. I wish to debate the 2021 Budget at the committee stage on Head P.27 – Ministry of Public Works, referring to Item 90000 – Other Construction; Highways and Bridges in Peninsular Malaysia with an allocation of RM1,029,145,700, together with Item 05100 – Major Roads in Sabah; Highways and Bridges in Sabah with an allocation of RM100. Also Item 08270 – Restoring Roads; or under Highways and Bridges in Sabah, also with an allocation of RM100, and Item 09260 – Road Upgrading (II); under Highways and Bridges in Sarawak with an allocation of RM1,500,200. Mr Chairman, I submitted a notice of motion under Standing Order 66(9) on Thursday to the Secretary of the Dewan Rakyat, to be raised today, namely a proposal that the Ministry of Finance cut RM1 billion from RM3,699,029,800 under Head P.27 – Ministry of Public Works, for Highways and Bridges in Peninsular Malaysia, under Item 90000 – Other Construction, which had been proposed to be allocated RM1,029,145,700. At the same time, I also submitted a notice of motion to reallocate that RM1 billion to the same ministry, namely the Ministry of Public Works under Head P.27, and to put RM500 million into Item 05100 – Major Roads in Sabah; and the remaining RM500 million into Item 09260 – Road Upgrading (II); that is, under Highways and Bridges in Sarawak. However, both motions were rejected by you, Mr Chairman, on technical grounds. I made this proposal after studying the current condition of federal roads in Sabah. Of the 23,718 kilometres of federal roads in Sabah, only 11,857 kilometres, or 50 per cent, are paved, compared with 81 per cent paved in Peninsular Malaysia and 64 per cent in Sarawak. Furthermore, when we look at the condition of federal roads in Sabah, 307 kilometres of paved roads are in poor condition and 306 kilometres are in very poor condition and can no longer be maintained, or unmaintainable. Works such as resurfacing or preservation treatment, minor rehabilitation and major rehabilitation require an allocation totalling RM969 million, namely RM228 million for resurfacing, RM336 million for minor rehabilitation and RM325 million for major rehabilitation. There are two federal roads in Sabah in such a state, namely Teluk Telupid Batu 32 Road and the Kalabakan–Sapulut Road, which have already been declared by the JKR Sabah (Public Works Department Sabah) as roads that can no longer be maintained, or unmaintainable roads. All the structures on these roads are badly damaged and need to be rebuilt. The Ministry of Finance should have given priority in the distribution of allocations to these two roads for reconstruction. Mr Chairman, just imagine, what can JKR Sabah do to tackle, particularly to restore, 617 kilometres of federal roads in Sabah next year, that is in 2021, with an allocation of only RM100? If JKR Sabah does nothing, these roads will surely get worse and may even become completely impassable, especially the Kalabakan–Sapulut Road and the Telupid Batu 32 Road. The likelihood of road accidents on both these roads will surely increase. Because the situation is so urgent, I request that RM1 billion from the Other Construction item in Peninsular Malaysia be cut and transferred to Sabah and Sarawak. Perhaps the Ministry of Finance will also say that Sabah and Sarawak have been given allocations for the Pan Borneo Project packages. However, Mr Chairman, I wish to state in this honourable House that of the 23 Pan Borneo Project packages remaining, I have been informed that only two packages have been listed for implementation in 2021, or have been listed but it is not yet confirmed whether they will be implemented or not. There is no certainty, no commitment, and the remaining 21 packages have not been given any attention by the Ministry of Finance and have not been approved. Therefore, do not even try to raise the issue of Pan Borneo Project allocations if there is no commitment to implement them by providing sufficient allocations that will certainly be carried out. Do not make promises a hundred times only for in the end no allocation to be given. Mr Chairman, I also wish to state in this honourable House about highway projects in Sabah. I have been informed that of the 26 projects proposed, only 15 have been approved, but it is not yet certain whether they will be implemented or not, particularly next year. Mr Chairman, as I stated earlier about the condition of Telupid Batu 32 Road, where there are many potholes that have caused many accidents. The Honourable Member for Beluran, the Honourable Member for Libaran and the Honourable Member for Kinabatangan will surely be more knowledgeable about the condition of this road because the road is located in their areas. The Honourable Member for Beluran will surely also be happy that I have stood up in this honourable House and, in turn, support my motion to cut RM1 billion from the Other Construction item in Peninsular Malaysia. The same goes for the Kalabakan–Sapulut Road, Mr Chairman. The Honourable Member for Pensiangan, Deputy Minister in the Prime Minister's Department (Economic Affairs). The Honourable Member for Kalabakan and the Honourable Member for Tawau will surely support this motion of mine. This is because both these roads need not only rehabilitation but also need to be rebuilt. To my colleagues from Peninsular Malaysia, I seek your support. Do not merely sympathise with the infrastructure situation in Sabah...

Tuan Pengerusi.

...we must look towards Borneo, but support it with a commitment that Sabah wants to progress...

May I be allowed to pass?

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Continue, Honourable Member for Tuaran.

May I, Honourable Member for Tuaran?

Daripada siapa?

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

The Honourable Member for Libaran.

Libaran, Libaran.

I thought I would give way to the Honourable Member for Libaran because this is his area, Mr Chairman, please.

I ask, when the Warisan Government was in power, during the Warisan Government, did the previous government identify that this road was indeed already damaged and needed to be repaired? What did the previous government in the state of Sabah plan regarding this road? Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Libaran. Please, the Honourable Member for Tuaran.

Thank you, thank you. I do not wish to politicise this issue.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

I ask the Honourable Member for Tuaran to sum up.

Yes. I have already summed up. I do not wish to politicise this issue. The issue is that this road is in bad condition and we must struggle together so that it is rebuilt, Honourable Member for Libaran, do not politicise it. [Applause] We want to solve the problem. So, to my colleagues from Peninsular Malaysia, I seek your support because let us not merely look towards Borneo, but give a commitment that the existing allocations, the existing federal government money, should be distributed to the most...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

May I ask a question?

Yes, Honourable Member for Kinabatangan, please. Minister of JKR.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Honourable Member for Tuaran, I– we are aware that the roads in Sabah are indeed in bad condition and need to be repaired, upgraded and so on. However, will the proposal to cut RM1 billion further improve the quality of these roads? I ask, yes.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Alright, thank you, the Honourable Member for Kinabatangan. Please, the Honourable Member for Tuaran.

Honourable Member for Kinabatangan, actually if we put this RM500 million into rebuilding the Telupid road, Batu 23, which passes through the road to your area, it would surely be resolved. Perhaps the Kalabakan to Sapulut road will also be resolved by being rebuilt.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

[Speaking without using the microphone] ...Don't worry, Honourable Member. We will carry out Pan Borneo next year, all 20 packages.

That is the promise, Honourable Member, but I have already stated just now...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

This is not a promise. I was a Minister there. I know what I did...

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the microphone]

Okay, please. I am together with the Honourable Member...

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

I support the Honourable Member for Kinabatangan.

I am together with the Honourable Member, ensure that everything that has been listed is carried out, because there are 23 packages in total, and so far only two packages have been given.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatangan

Memang sebab banyak masalah politik Yang Berhormat. Akan tetapi I will be there, I know what to do.

Let us stop politicking, let us all fight for Sabah to progress, and Malaysia will also prosper. This is what is certain we will do, and we should not engage in too much politics. We want our country to progress together.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Sabah under the new state government, Sabah will still progress more than other states.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Alright. I ask the Honourable Member for Tuaran, I give you one minute to sum up. One minute.

That is why, Mr Chairman... [Speaking without using the microphone]

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Switch on the microphone, switch on.

That is precisely why, Mr Chairman, I submitted that motion because it is clear. I feel – as a Member of Parliament, as a Sabahan, I feel insulted when an allocation of RM100 is given to repair the roads in Sabah. RM100 for major roads in Sabah. I feel insulted and I feel that the Honourable Member for Kinabatangan also feels insulted. He is the Minister of Public Works for Sabah, how can that be. That is why I said to cut RM1 billion from that Peninsular allocation and give RM500 million to Sabah. Otherwise, Mr Chairman, how long will it be like this in Sabah? We just talk, we want to do... [Inaudible] "Look to Borneo" but we have never implemented it.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Alright, thank you.

Terima kasih.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Tuaran. Now I invite the Honourable Member for Pasir Puteh. Five minutes.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you, Mr Chairman. I wish to continue referring to Item 010200 – Corporate Policy and Management. In the allocation given, although it has decreased slightly compared with 2020, I hold a hope that the distribution for development, especially infrastructure, roads and buildings under the supervision of JKR, is distributed properly and systematically, especially for the state of Kelantan Darul Naim. I fear that the financial projection allocated by JKR is tied to allocations that have been spent before, in a situation where the state of Kelantan has for a long time been treated as a stepchild by the Federal Government. I hope that when a strong and solid alliance is formed, the allocation provided to the state of Kelantan can be increased, because it needs to be seen that the roads in the state of Kelantan are extremely neglected. In Pasir Puteh constituency, if we look, from the start of leaving the state of Terengganu and entering the state of Kelantan, within a distance of less than 10 kilometres, there are seven bridges that are narrower than the road. This narrowness, if there is a clash between two large vehicles, will cause a terrible accident, and before this, there have already been accident after accident. I have mentioned in this honourable House, this is the third time I have mentioned that these bridges need to be enlarged immediately, and new bridges built so that the flow of cars can move in an orderly and proper manner. Second, under Item 030000 – Building Infrastructure Construction. On this issue, I wish to touch on the duties and responsibilities under JKR regarding hospital development under Item 030500 – Health Works Branch. Although it concerns infrastructure, I wish to raise here the need to establish a specialist-standard hospital in the Pasir Puteh area because this need is very urgent. The people of Pasir Puteh have to go to Kota Bharu or go to Kuala Krai, a very long distance. Perhaps the government does not feel it because this burden is borne by the people. However, the costs, whether the family cost to visit, as well as the cost for patients who bear the round trip from Pasir Puteh to specialist hospitals in Terengganu or in Kelantan, it is a very long distance. I think the Pasir Puteh area is a suitable area to build a hospital to serve the surrounding residents and I ask JKR to try to discuss with the Ministry of Health to make these programmes a success. Next, I wish to refer to Item 051200 – Maintenance of Federal Roads in Peninsular Malaysia. I think it is time, from Terengganu, Terengganu here has two lanes for one direction. Entering Kelantan, it becomes one lane. The road from Peninsular Malaysia, whether to enter Kelantan or to go to Thailand, tourists who want to go to Thailand, will notice it very clearly. Leaving the state of Terengganu, entering the state of Kelantan, the road is narrow, the road is not managed well. I think the JKR can look at an allocation to be repaired and expanded to become two lanes one direction from the border at Bukit Yong or the border at Kuala Besut, entering the state of Kelantan Darul Naim. Last is Item 02800 – Repairing, Replacing and Upgrading Roads and Bridges. On this issue, I see especially in the Pasir Puteh district, the bridges are not only smaller than the road, the drainage system is also small, causing floods when the water flow is blocked at the bridges that are almost everywhere, not only in Pasir Puteh but in the state of Kelantan as a whole. So, a sum of allocation, I very much hope, and appeal to the Minister, hopefully. Hah, look! Kelantan's fate is the same as Sabah and Sarawak...

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Pasir Puteh.

So that it is seen properly and in an orderly manner. That is all, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Pasir Puteh. Now I invite the Honourable Member for Kalabakan, followed by the Honourable Member for Bukit Gantang. The Minister will reply at 11.50 am.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Can Beruas be given a chance or not? It has been many times already.

Tuan Teh Kok LimDAP · PHTaiping

Taiping?

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Thank you, Mr Chairman.

Tuan Teh Kok LimDAP · PHTaiping

Taiping ya.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Peace be upon you, and the mercy and blessings of Allah. Indeed, I must agree with the Honourable Member for Tuaran. Sabah is always treated as a stepchild. Hopefully, the Honourable Member for Kinabatangan, who has stated that the 23 Pan Borneo projects will begin next year, will become a reality. Do not promise, promise, which is always not fulfilled. I will begin my debate speech with Item 050000...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Mr Chairman, I have never made a promise. I am not like those leaders who like to make promises.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Thank you, the Honourable Member for Kinabatangan.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

I said, I will keep my word.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Hopefully. But unfortunately, the Tawau–Kalabakan and Sapulut road is not in Pan Borneo. Unfortunately that is so. I will begin my speech...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

It doesn't matter. Just debate.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

With Item 050900 – Maintenance of Federal Roads in Sabah, Sarawak and W.P. Labuan. Mr Chairman, in the Auditor General's Report 2018 Series 2 which was released last April, it was reported regarding weaknesses in the management of paved road maintenance projects in the state of Sabah.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

According to the road condition index, 55.3 per cent of the state roads in Sabah fall within Scale Three and Scale Four. Scale Three is moderate, and Scale Four is poor. This index shows that paved roads in the state of Sabah need more attention in terms of periodic maintenance, particularly the roads in the Kalabakan Parliamentary constituency, which also include the connecting roads in Tawau. In this regard, I ask the Honourable Minister to explain. First, what are the actual challenges and constraints faced by the Federal Ministry of Works (KKR) in the management and implementation of maintenance works for paved roads in Sabah? Second, has the ministry taken the initiative to obtain studies or feedback from the Public Works Department of Sabah (JKR Sabah) regarding the weaknesses in the management of paved road maintenance works in Sabah, as reported in the Auditor General's Report 2018? If not, what is the ministry's planned effort to ensure that all aspects of the implementation of federal and state road maintenance works in Sabah receive balanced attention from KKR, even though state road matters in Sabah are the responsibility of JKR Sabah? Third, what works monitoring will be renewed and improved to ensure that aspects such as budget management and project scheduling can be handled in a more orderly manner, so as to avoid delays and postponement of paved road maintenance works, particularly in the Kalabakan Parliamentary constituency? Fourth, given the separation of scope of responsibility between KKR and JKR Sabah in federal road matters, how can KKR guarantee that each implementation of federal road maintenance works is truly managed in accordance with the original standards, planning and budget by the federal KKR? Fifth, what is the estimated allocation that will be set aside for paved road maintenance works in Kalabakan and Tawau that have been postponed until today? When will the maintenance works be restarted?

Mr Chairman, I would next like to touch on Item 08230 – Bridge Construction, Item 08260 – Upgrading and Rehabilitation of Roads, and Item 08270 – Rehabilitation of Roads. For the information of the Honourable Minister, bridges are very important logistical links for village residents to move about, especially for schoolchildren and schoolteachers. I welcome the multiple-fold increase in the allocation for these items. I ask the Honourable Minister to elaborate on, first, what differences there are in terms of construction materials and construction technology used in each bridge construction work in the areas of Sabah, so as to make every bridge to be built in 2021 stable and safe for all types of vehicles, including bicycles? Second, what form of coordination in bridge construction project management between KKR and JKR Sabah in identifying old bridges and damaged bridges that can be reconstructed, particularly in rural areas? Third, will the bridge construction projects to be allocated under this item include the construction of two-lane bridges to facilitate the movement to and from the village for villagers, especially those with cars and motorcycles?

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Member, please summarise, Honourable Member.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Third, of the 25 parliamentary seats in Sabah, how many parliamentary seats will be focused on for allocation for road upgrading, and what physical factors will be assessed for that purpose? Fourth, does the ministry intend to upgrade existing roads in industrial areas in Sabah to create dedicated roads or special lanes for the movement of heavy lorries, which have so far been the cause of damage to public roads? If so, I ask the Honourable Minister to state the areas involved and the estimated cost of each upgrading work. I would also like to touch on a major project in Kalabakan. If possible, I ask the Honourable Minister to seriously consider the construction of the Serudong-Simanggis CIQ complex, a 40-kilometre highway and government housing. This project can be considered a pioneer in the government's efforts to realise balanced development between regions in Malaysia. The connection of road networks between the regions of Sabah, Sarawak and Kalimantan, which have a population of approximately 25 million people, can indeed create good socio-economics. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Member for Kalabakan. Now I invite the Honourable Member for Bukit Gantang, followed by the Honourable Member for Taiping.

Peace be upon you, and the mercy and blessings of God.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Please, Mr Chairman, before the winding up.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

After this, after this.

Greetings of peace. Mr Chairman, firstly, I would like to touch on the expenditure allocation for 2021 for Code 30000, from RM6.207 billion to RM6.019 billion, where there is a reduction of RM188 million. Will this reduction affect the projects that have already been listed previously, or complete and finish projects that have already been implemented? Will this reduction affect the development of the West Coast Expressway (WCE) Project, which starts from Banting, Selangor to Changkat Jering and the last exit in Perak, in the Bukit Gantang Parliamentary constituency? This project has already been implemented late. As a result, there have been flash floods, mudslides and disruption to residents in traffic. In this budget, does the Ministry of Works have a project completion date and a phased completion plan due to the reduced development budget allocation? This information is important for anticipating local socio-economic developments and preparatory measures. When there is accessibility, as they say, with permission, certainly an area will develop along the exit route from Selangor to Perak that connects towns or small villages. Next, Item 050200 – Minor Bridge Maintenance and Repair, where the allocation for next year remains at RM4 million as in Budget 2020. I feel this allocation is insufficient because many roads need maintenance, as do bridges, due to rain throughout the year. In the Bukit Gantang Parliamentary constituency, on Federal Route FT60 from Pekan Terung towards Beruas, this route is heavily used by heavy vehicles, and there are also many river drainages here, for example Sungai Temelok and Sungai Rotan. The condition of the bridges is seen to be narrow and in need of maintenance, particularly such as bridge guardrails and narrow bridge signs, so that fatal accidents do not occur, especially at night when the road is winding. Next, the last item I would like to touch on is Item 051200 – Maintenance of Federal Roads in Peninsular Malaysia, from RM280 million increased to RM309 million. Firstly, I thank the Ministry of Works for its concern, having acted swiftly on complaints about route FT60 Batu Hampar, Changkat Jering and Larut, Matang in the Bukit Gantang Parliamentary constituency. Maintenance works and resurfacing have been carried out. However, there is still damage that needs to be maintained immediately. Among them, I would like to mention here, first, the Estet Alaga Air Terjun road; second, the Batu 56 Jalan Kuala Kangsar road from the Changkat Jering junction, which is Federal Route 1; third, the Simpang Halt, Taiping road towards Bagan Serai and Air Putih towards Simpang Taiping, Federal Route 1; fourth, the Jelutong, Bukit Gantang road towards Bukit Berapit, Padang Rengas, Federal Route 1. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Member for Bukit Gantang. Now I invite the Honourable Member for Taiping.

Tuan Teh Kok LimDAP · PHTaipingEN

Thank you, Mr Chairman, for the opportunity given to Taiping to debate at the Committee stage of KKR.

Tuan Teh Kok LimDAP · PHTaipingEN

Item 050800 – Repair and Maintenance of Slopes on Federal Roads in Peninsular Malaysia. The allocation was reduced from RM140 million in 2020 to nil in 2021. I ask for an explanation as to why there is no allocation at all for next year? This worries me because the slope along the federal road at Bukit Larut, Taiping has suffered landslides and has been closed to visitors since 9 November 2019 until now. Mr Chairman, by reviewing the answer at the Special Chamber sitting given by the Honourable Minister of Environment and Water on 5 August this year. It was stated that, based on the limited allocation and the existence of other more critical locations that require immediate repair, only four locations were repaired for slopes using the tieback wall method on route A275, Jalan Bukit Larut, Larut, Matang and Selama District, with a work order cost totalling RM2.3 million, and it is expected to be completed on 10 December, in two or three days' time. Mr Chairman, now according to the information I have received, there are still at least four slope landslide locations that are still waiting for allocation from the ministry. Therefore, Taiping respectfully requests the Minister's kind attention to this matter and to allocate a sufficient amount to resolve the landslide problem at Bukit Larut, Taiping. Mr Chairman, the Bukit Larut Recreation Centre is one of the icons of the Taiping Heritage City that won the Top 3 World's Best Sustainable Destination Award 2018. It is important, in order to maintain the sustainability and attractiveness of the recreation centre, that cooperation and support from the Ministry of Works are greatly needed. Followed by Item 040300 – Slope Engineering Branch. With an allocation of RM7.4 million. I ask the Minister for an explanation of the duties of this branch regarding the monitoring of slopes on federal roads, especially the monitoring work schedule on Jalan Persekutuan Bukit Larut, Taiping. Mr Chairman, apart from the slope landslide problem, Jalan Persekutuan Bukit Larut, Taiping, namely route A275, also needs to be upgraded for the comfort and safety of visitors. While waiting for the slope landslide repair work, Taiping requests that under Item 051200 – Maintenance of Federal Roads in Peninsular Malaysia, part of the RM309 million be allocated to Jalan Persekutuan Bukit Larut in Budget 2021. Next, Item 050100 – Overseas Duties, for the year 2020. Faced with the COVID-19 pandemic, I would like to ask how many overseas duties have been postponed and how much of the RM975,000 remains unused? Mr Chairman, lastly, Item 051200 – Maintenance of Federal Roads in Peninsular Malaysia. Under the road maintenance programme, I am moved to raise the unsatisfactory condition of white road lines in many areas, including on the PLUS Highway. This problem will become more critical at night, especially on rainy days. I have received many complaints on this issue, and I respectfully request the ministry's kind cooperation in monitoring this issue more strictly and seriously for the safety of road users. That is all, Taiping awaits the Minister's explanation and good news. Thank you.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Just a moment, please, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Member for Taiping. I will give the last opportunity to the Honourable Member for Kinabatangan. Five minutes.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Thank you, Mr Chairman.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Padang Serai, please. Padang Serai...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatangan

Butiran...

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Tidak sempat.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Kedah state has had absolutely no one since earlier.

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Tidak sempat.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Item 990200 – Maintenance of Federal Roads Throughout Malaysia (Periodic Pavement) throughout Malaysia, and also Item 00700 – Other Construction of Federal Roads and Bridges throughout Malaysia. I would like to draw the Honourable Minister's attention to the fact that the people of Sabah are rather a bit disappointed, with the budget that was tabled earlier, in relation to the construction of the Pan Borneo Highway in Sabah. Although our fellow, the Honourable Member for Tuaran, has stated – I agree that the roads in Sabah are indeed terrible. What is more, they were made even worse by the former Warisan Government. They did nothing to improve the quality of these roads.

Honourable Member, don't play politics, Honourable Member.

Tuan Khalid bin Abd SamadAMANAH · PHShah AlamEN

Thank you, Barisan Nasional, how many decades have you governed the state of Sabah!

[Dewan riuh]

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Withdraw the blame on Warisan, withdraw. Do something! Do something! Do...

[Dewan riuh]

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Sit down, we have already planned. We have already planned, sit down.

Honourable Member, continue. Don't politicise...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

We have planned, sit down. Honourable Member is speaking, I am listening.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Barisan Nasional governed Sabah for 25 years, what did they do?

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatangan

Eh! Yang Berhormat, this is my floor, you sit down! You have no right.

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Ya.

I will sit down.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

You shut up! [Public address system switched off]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Yes. Honourable Member for Kinabatangan, that is my call, now is your floor. Alright, continue.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the public address system]

Mr Chairman (Dato’ Mohd Rashid Hasnon)

Teruskan.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

So I would like to propose to the government that the Sabah State Government intends to see the Pan Borneo Highway in Sabah become a reality. However, if the allocation is only RM460 million for one package, this is not reality, this is really a nightmare.

Tragedy, tragedy. [Speaking without using the public address system]

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

So, I – we intend for the government to allow the Sabah State Government to carry out the entire Pan Borneo Package under PFI.

Saya sokong!

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

This is important to ensure that the people of Sabah enjoy good highways, as enjoyed in other states. I request the ministry and the Minister to bring this to the Cabinet, and decide that the people of Sabah truly thirst for road development and good highways. So far, the Pan Borneo in Sabah has only reached just over 20 per cent, while in Sarawak it has reached 65 per cent. Soft loans and the sukuk proposed were cancelled by Pakatan Harapan and supported by Warisan. This is our problem.

[Ketawa]

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Try to answer, if you are there. Who cancelled the sukuk?

Tuan Khalid bin Abd SamadAMANAH · PHShah AlamEN

Are you joking? Are you making jokes?

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Honourable Member for Shah Alam, you shut up! You have not done anything, so you have gone crazy.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Review, price review. Price review, Dato'. When Warisan was in power, price review.

Tuan Khalid bin Abd SamadAMANAH · PHShah AlamEN

Decades, decades of BN.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

You are crazy for a position. Already lost, so be it.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

...Review, they said it was changed.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

You are a loser. You lost, let them be losers. Don't talk too much, if you want to stand, ask. If you want to debate with me, you can debate with me any time. Don't just talk nonsense.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Member for Kinabatangan, which item? Please.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

The item, Honourable Member for Shah Alam, is nonsense. So that is...

[Dewan riuh]

Tuan Khalid bin Abd SamadAMANAH · PHShah Alam

Dia merepek, Tuan Pengerusi. I don’t know what he is talking about. Butiran pun tidak tahu.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Eh! You shut up! [House in uproar] I want to ask the Minister...

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

He is bertaburan, bertaburan. Not butiran, bertaburan.

Tuan Teh Kok LimDAP · PHTaipingEN

Mr Chairman, don't waste time, Mr Chairman. Just wasting time.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Honourable Member for Sepang, you will fall later, and then it will be difficult again. Prepare the health there, you will fall, Honourable Member. We are dead. Mr Chairman... [Laughter]

Bertaburan lah you ni...

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

The jokes this morning are quite enjoyable...

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

I want to ask to ensure that...

Tuan Khalid bin Abd SamadAMANAH · PHShah AlamEN

Item after item, items... [Laughter]

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

Eh! What is this? Perhaps the Honourable Member for Shah Alam has taken the wrong medicine. [Laughter]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Continue, Honourable Member, continue.

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatangan

Untuk memastikan...

Tuan Khalid bin Abd SamadAMANAH · PHShah AlamEN

Those who don't take medicine like you are the crazy ones. [Laughter]

Dato’ Sri Bung Moktar bin RadinUMNO · BNKinabatanganEN

To ensure that the people of Sabah also enjoy balanced highway development, the Pan Borneo is planned to bring convenience to all the people of the state of Sabah. However, it seems that even by 2040 it will not be completed if it is one year, one package, one year, one package. This is a sign of sinking. So, that is why I, as a representative of the people from Sabah, want to ask. I request that the government consider giving leeway to the state of Sabah to implement the entire Pan Borneo package in Sabah under PFI. Thank you, Mr Chairman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Member for Kinabatangan.

Tuan Baru BianPKR · PHSelangauEN

Mr Chairman, Mr Chairman, Honourable Member for Selangau, Mr Chairman. May I appeal?

This is important, JKR.

Tuan Baru BianPKR · PHSelangauEN

Not a single person from Sarawak is here.

Mr Chairman (Dato' Mohd Rashid Hasnon)

Bagi tidak?

Kasi lah.

Tuan Baru BianPKR · PHSelangauEN

Four minutes. Only four minutes.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

I had already informed earlier that I wished to interject, but now I have given the floor to the Honourable Minister to reply.

Tolong lah.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Sorry. You may just interject.

Dato' Sri Haji Fadillah bin YusofPBB · GPSMinister of Public Works · Petra JayaEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Thank you, Mr Chairman, and thank you to the nine Honourable Members who took part. From Kota Raja, Jerantut, Merbok, Setiu, Tuaran, Pasir Puteh, Kalabakan, who took part in several matters, and this includes Taiping, Bukit Gantang and also Kinabatangan. I will now respond to the question raised by the Honourable Member for Kota Raja. For the information of the Honourable Member for Kota Raja, for the Twelfth Malaysia Plan, we will carry out two studies relating to new surfacing and the basic structure of roads. [Deputy Speaker (Dato' Sri Azalina Othman Said) chaired the Committee] Indeed, we are aware that traffic and the number of heavier vehicles are increasing, where vehicle 'axles' have been approved by the Ministry of Transport for upgrading. We need to review, first and foremost, the condition of our roads, the methods and the materials used, and this also includes bridges. Many have raised matters relating to the maintenance and also the condition of our bridges. This is indeed something we are doing, including improvements to roads and bridges that need to be upgraded so that they can cope with vehicles that are getting bigger, heavier and so on. At the same time, we have also collaborated through our study to introduce what is called way emotion, where we can obtain the actual condition of vehicles passing on the road using the latest technology. At present, if we look at JPJ, heavy vehicles have to enter weighing centres. Now this is no longer necessary. An amount of RM50 million has been approved for the Ministry of Transport, where these weighing devices will be placed on the road, which will be able to measure the weight of traffic on the road. With that, we will be able to obtain more accurate data and we can make better planning in the future. For the Kota Raja area, actually mainly at Port Klang, for 2002 an amount of RM49 million was allocated for the maintenance of roads around Port Klang. The roads involved are FT181, FT180, FT103, FT20, FT02 and also FT3218, namely Jalan Batu Unjur. The scopes carried out were pavement and non-pavement works. Alhamdulillah, the concession company that was appointed completed these works in October last year. For the future, in 2021 we have already approved and obtained allocation to upgrade the third phase of the Pulau Indah Ring Road project. This will be upgraded and, insya-Allah, with this road it will be able to improve the alignment of the areas along Port Klang, because we are aware that this area is very important as it is the main artery of our country's economy. I now turn to the Honourable Member for Jerantut. The Honourable Member for Jerantut asked about Class G1. Is there a specific programme for them? For your information, we have received special allocations, namely the PRIHATIN project and also the PENJANA project, which are specially allocated to G1 and G4. For G1 and G4 under the PENJANA and PRIHATIN projects, a committee has been appointed, where it is given directly to G1 and G4. Meanwhile, the concession companies, under the existing allocation, will manage their projects, and some of them will also be handed over to G1 and G4. For the Honourable Member for Merbok. I can say that I will touch on it in general terms. Many have raised matters relating to road maintenance, and I am aware that this is a fairly big issue. That is why we have given a commitment under the Ministry of Works. One of our commitments is zero pothole. Zero pothole, alhamdulillah, so far we have empowered JD to carry out and check all the work implemented by the concession companies to ensure that all potholes, if they occur on federal roads, must be closed within 24 hours. Patching, temporary resurfacing and permanent resurfacing will be carried out after that. This is to ensure that no accidents occur and the safety of road users can be guaranteed. There are specific requests. I will respond in writing to any allocation requested specifically for local areas or projects. As for slope maintenance, indeed what the Honourable Member for Merbok said earlier is correct: there is one company that was appointed, and their appointment period ended on 31 October 2020. But actually the project they were appointed for was for three years plus two years. So far we have extended it, as approved by the Ministry of Finance, for one more year, on condition that they can only be extended for two years if they achieve a score of 80 per cent. Earlier there was criticism from Audit, and we acknowledge it, and that is why we are looking for ways to ensure that it can be improved. That is why we are only extending it for one year, not two years as provided in the agreement. For your information too, the Honourable Member for Merbok earlier mentioned slopes on the Sandakan-Tawau road and also the Kinabalu-Sandakan road. Insya-Allah, both of these roads have actually been approved with allocations under the First Malaysia Plan, in the first rolling plan in 2021. The Twelfth Malaysia Plan will implement kilometre 58.6 and also kilometre 147.9 of the Kota Kinabalu-Sandakan road. The Honourable Member for Tuaran, perhaps there is a slight misunderstanding when saying that Sabah only received an allocation of RM100. The total allocation for Sabah for 2021 is RM1 billion for Pan Borneo Sabah. Every year it will receive RM1 billion. Another matter is the allocation said to be for...

Honourable Member, a brief explanation.

Dato' Sri Haji Fadillah bin YusofPBB · GPSPetra JayaEN

Let me be, I have not yet answered. How can I ask for an explanation? Let me answer first.

But I am referring to the details....

Dato' Sri Haji Fadillah bin YusofPBB · GPSPetra JayaEN

Let me answer first.

...that, Honourable Member.

Dato' Sri Haji Fadillah bin YusofPBB · GPSPetra JayaEN

Let me answer first.

Mr Chairman (Dato' Sri Azalina Othman Said)EN

Honourable Member for Tuaran.

Bagi penjelasan.

Mr Chairman (Dato' Sri Azalina Othman Said)EN

Honourable Member for Tuaran, let the Honourable Minister answer first. Please proceed.

Dato' Sri Haji Fadillah bin YusofPBB · GPSPetra JayaEN

The Member of Parliament for Tuaran stated that only a token amount of RM100 was allocated. For the information of the Member of Parliament for Tuaran, under Item 05100, development purpose 27, Ministry of Works, in the Budget 2021 proposal book, indeed this RM100 was allocated. But this is actually specifically for only one project, namely upgrading the road from Donggongon to Papar (SPUR) Phases 2 and 3, where this project has so far only reached 90 per cent because there are variation orders. With the variation orders, it is expected that it will not be completed by 31 December 2020. That is why we have to allocate that RM100 so that next year, when the variation order is approved by MOF, the allocation can be disbursed to pay any payments. This means there will be an additional allocation to complete this specific project. As for the whole of Sabah's roads, if we look at the allocation under Item 05100, Major Roads in Sabah, an amount of RM1.18 billion has actually been allocated. The Honourable Member may look at Item 82000: RM1 billion is for Pan Borneo, and RM100 million is proposed for roads and other items in the state of Sabah. Among them are the Item for Building New Roads under item 08230, Upgrading Roads – 08260, Narrow and Dilapidated Bridge Replacement Programme – 02800, and Slope Repair Programme – 08250.

Dato' Sri Haji Fadillah bin YusofPBB · GPSPetra JayaEN

For maintenance in the state of Sabah, an amount of RM80 million is allocated for the coming year. This is for pavement supplies and also non-pavement works. So, that is my response, Honourable Member for Tuaran.

The Honourable Member requests an explanation: the RM80 million is not stated under any item and does not appear in this estimate. So, where is that RM80 million? Secondly, in terms of restoring roads, that means resurfacing, rehabilitating roads and so on. It is clear here, an allocation of RM100 under Item 08270 – Restoring Roads. So, this is the explanation we are requesting. Why RM100? Can the Honourable Member tell us that there are indeed some that are being carried out and applied for but have not yet received the money, such as the Donggongon road earlier. That is the – This is because we are very worried, Honourable Member. Roads with potholes, such as the Honourable Member for Kinabatangan also agreed earlier. Jalan Telupid for example, Mile 32 in Sandakan, is full of potholes, there have indeed been accidents, and it really cannot be rehabilitated anymore and needs to be rebuilt. Estimate– I have been informed by JKR Sabah that it has already been prepared to build all of this, but the allocation is not provided here, only RM100 is given, Honourable Member.

The RM100 I mentioned earlier is only specifically for the Papar-Donggongon project that I referred to. For the information of all of us, actually in the planning...

RM100, Honourable Member, one item for restoring roads, Item 08270, is also RM100, and the other, major roads in Sabah, is also RM100. There are two RM100 items, Honourable Member. So which one is the Donggongon-Papar one? Item 05100 or Item 08270, which one is the Donggongon-Papar road, Honourable Member?

I already said earlier, Donggongon-Papar is under Item 05100, which was provided for the project to upgrade the Donggongon-Papar road, Item 05100. That is what was allocated, that is why...

However, Honourable Member, that is a Pan Borneo project, and the Pan Borneo project has already been allocated funds.

No, no, sit down first. It has the Donggongon-Papar road first under a specific project. It is not only Pan Borneo, because the Pan Borneo referred to is only a total of 35 packages that were announced earlier. The Donggongon-Papar road is a project under the development allocation, not under the Pan Borneo Project, which is why there are VOs and so on that we have to resolve. Many problems arose at the site, whether relocation of utilities and so on. That is why we have prepared this allocation of RM100, so that it can be carried over to 2021.

Honourable Member, I have a specific question. This concerns the Berungis Roundabout-Mengkabong Roundabout road. It has indeed been approved and is to be implemented, but there is a dispute between the state government and the Federal Government over whether the road is to be handed over to the Federation or not. However, the allocation has indeed been made earlier and it is indeed to be appointed for implementation. I would like to know whether such projects will be provided with allocations or how it will be. Thank you.

Mr Chairman, I will answer specifically because this is a specific question and I need notice.

Tuan Teh Kok LimDAP · PHTaipingEN

Honourable Minister.

Regarding the method for...

Tuan Teh Kok LimDAP · PHTaipingEN

Honourable Member, Taiping.

Wait, let me finish first, Honourable Member for Tuaran. Regarding the Pan Borneo Sabah Project, 35 packages for phase 1 were approved under the previous Barisan Nasional government. Of the total 35 packages, when the government changed to Pakatan Harapan, it was decided that the implementation method through PDP was cancelled. Where PDP was cancelled, there were previously two financing methods for Pan Borneo Sabah and Sarawak. Firstly, through the development fund method from the government. Secondly, through the DanaInfra loan. For Sabah, DanaInfra has already been cancelled. Therefore, it was only decided to implement 20 packages out of the 35 packages that had been approved. Of those 20 packages, 15 have already been tendered, one was cancelled and terminated due to the contractor's inability to carry out the work and will be re-tendered. Another has already been approved under this 2021 package, namely the Serusop to Pituru route. So, altogether 16 out of the 20 approved, 16 will be implemented. In response to what was said by the Honourable Member for Kinabatangan and also the Honourable Member for Kalabakan, who requested that it be completed, we are prepared to discuss with the new Sabah State Government regarding the new implementation method. Whether it can be implemented through PMI and so on, we have to discuss and look at the government's financial position. If DanaInfra had not been cancelled, insya-Allah these 35 packages would have been implemented. For Sabah as a whole, the plan is three packages. The first package is 35, and the others are actually still many more that we need to implement to complete the whole of Pan Borneo in Sabah. We will discuss with the Sabah State Government how the way forward is, insya-Allah, for us to implement this Pan Borneo Sabah.

Okay, Honourable Member, last question. Does the Honourable Member agree that in this expenditure estimate there is a lack of transparency in how the allocations are distributed. There is no sincerity at the Ministry of Finance level. I also feel sorry for the Honourable Member as Minister of Works, how to distribute and resolve the various problems in Sabah. However, when the Honourable Member answers, it cannot reflect what is in this estimate because there is no sincerity, it is not transparent. We do not know the RM100 allocation for the Donggongon-Papar road and so on. Then we wonder again, the road conditions really need maintenance but have already been declared by JKR Sabah as unmaintainable, cannot be maintained anymore because they need to be rebuilt. It is not stated here. This should be given priority in terms of allocation. Does the Honourable Member agree on this matter? Indeed we, Members of Parliament in Sabah, want to support and help the Honourable Member to obtain a greater allocation from the Ministry of Finance for your ministry. Thank you.

Mr Chairman, my time is up. Am I given time to answer?

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Honourable Minister.

Tuan Teh Kok LimDAP · PHTaipingEN

Honourable Minister.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Honourable Minister, answer just this, and then Honourable Minister, wrap up.

Actually there are still many other Honourable Members whom I have not yet...

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Please give the answers in writing because I still have many things to finish, for all ministries.

Alright, Mr Chairman.

Tuan Teh Kok LimDAP · PHTaipingEN

Honourable Minister, Taiping requests a written answer.

Ya, ya.

Tuan Teh Kok LimDAP · PHTaipingEN

Okay, thank you.

How many more do I have to answer? Later in writing, I will explain to the Honourable Member for Tuaran all the allocations of the concerns raised earlier...

Honourable Minister.

As we are well aware, we have to distribute based on what has been approved, and this approval is based on requests at the state level. The Central Agency will assess the priorities of the projects to be implemented and approved in all aspects, including maintenance and so on. However, because of the time, Mr Chairman, I will give a written answer to all who have raised the issues debated earlier. I think the answer to all...

Honourable Minister, if possible, a little, related to the earlier frozen rubber or CMA...

Mr Chairman (Dato’ Sri Azalina Othman Said)

Yang Berhormat.

This is because it involves, if we can..

For rubber, we have indeed been discussing with the Ministry of Plantation Industries and Commodities. There is indeed an MoU cooperation between JKR and the Malaysian Rubber Board (LGM). Several pilot projects have already been implemented in terms of new projects and also maintenance. Insya-Allah, a workshop between LGM and JKR and several experts will sit to finalise the report. What is the direction in terms of using this cup lump method? Will it bring more benefits, or is its strength the same as the conventional position at present? Insya-Allah, we will submit the report to the Cabinet at the end of this year, and next year we will know the direction, to what extent cup lump can be used.

However, for rubber alone there are actually three. There is crumb rubber, there is latex used, and also cup lump. There has indeed been a study to do both of these things for cup lump. The report is already available. Insya-Allah, it will be finalised. Mr Chairman, thank you.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Honourable Minister, just a little. Honourable Minister, just a little. I did not have the chance to debate earlier. I would like to ask a little.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Thank you, Honourable Minister.

Sorry. I am done, Mr Chairman. So, I say thank you. I will give a written answer to everyone involved. Thank you.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Just a little. I did not have the chance to debate earlier. So, I have to ask a little.

Deputy Speaker (Dato’ Sri Azalina Othman Said)EN

Honourable Member, please sit down, Honourable Member. Thank you. Honourable Members, the question is that the sum of RM1,260,407,200 for Head B.27, Operating Expenditure Estimates 2021, forming part of the Schedule, be approved. [Question put and agreed to] [Head B.27 ordered to form part of the Schedule]

Mr ChairmanEN

The question is that the expenditure under Head P.27, Development Expenditure Estimates 2021, be approved. [Question put and agreed to] [Head P.27 forms part of the Estimates]

–

Kepala P.28Anggaran Pembangunan 2021

–

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Supply Head B.28 and Development Head P.28 under the Ministry of Transport are open for debate. 15 minutes. Sorry, 45 minutes, then the Honourable Minister has 15 minutes. There are 10 Members on my side who do not support the government and six supporters of the government, and we will try our best to complete everything within 45 minutes. So, all Honourable Members, I ask and pray with full hope that you please keep to the five-minute time limit given. Honourable Member for Seremban, please proceed.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, Mr Chairman. I will try to keep to the time allocated. Firstly, Mr Chairman, I would like to refer to Item 010200 - Maritime. I maintain my position that the government's decision to revoke the cabotage exemption for submarine cable repair work is a wrong decision, a decision that harms the country in terms of strategic interest and has a very negative impact on the efforts of the Government of Malaysia and of the country to develop the digital economy sector in our nation. We know that the digital economy is a very important agenda for sustaining economic continuity in our country. I would like to refer to a report from a government agency which states that, I quote, Mr Chairman. 'Impact of revocation of cabotage exemption to the Malaysian digital economy and foreign investment'. One paragraph reads as follows, 'As a result of the cabotage exemption in 2019, several OTTs including Facebook and Google have landed new cables into Malaysia and continue to plan to do so. It is understood that such plan are now under review and that at least two cables plans for Malaysia landing are now potentially being rerouted to Singapore resulting in the direct loose of FDI and harping for Malaysia.' The conclusion in this report has four pages. I will read it. 'Submarine cable and data centre investment by OTT content provides represent components of the digital infrastructure necessary for Malaysia to support the digital economy and for IR plans. This submarines cable invesment must be kept fully operational and be restored quickly in the event of submarine cable failures. Malaysia currently does have not sufficient capacity of cable repair ships to support the necessary capacity and capability of submarine cables invested by the OTT content providers. The revocation represents a barrier for the restoration of submarine cable failures and indirectly indicate Malaysia's effort to attract foreign investment into the country.' Mr Chairman, this report was not stated by me. This report is from a government agency under the Ministry of Communications and Multimedia, namely the Malaysian Digital Economy Corporation (MDEC). Honourable Ayer Hitam, I think you know who its chairman is. The chairman of MDEC is Datuk Rais Hussin, a strong supporter of the Most Honourable Pagoh, the chairman or strategy director of the former BERSATU party, a right-hand man of the Honourable Pagoh. He has expressed this view in a report, and the Honourable Minister responsible is behind it. I know that many agencies and many ministries do not agree with the decision of this Ministry of Transport. This is because it has a negative impact on the country's competitiveness in terms of attracting foreign investment. The Honourable Gombak, who is in this august House, I think he also does not agree. The Honourable Indera Mahkota also does not agree, the Honourable Rembau, and the Ministry of Science and Technology also does not agree. But why is the Honourable Ayer Hitam so adamant in maintaining a position that is entirely detrimental to the country, even though the decision seems to be only to protect the interests of one company. Not the interests of the country. [Applause] The Honourable Pekan may also agree with this view. This is not in the interest of the country. So, I ask that the Honourable Ayer Hitam take a position in the interest of the country by revoking this intention and maintaining the position of granting a cabotage exemption for one sector only. It does not harm the country's shipping sector. Only one sector, namely submarine cable repair. Due to time constraints, Mr Chairman, there are two or three matters I will raise quickly, namely 031600 - Monthly Pass Incentive which is only allocated RM115 million in this budget book. However, the announcement by the Honourable Minister of Finance was RM300 million, and RM300 million is indeed needed to ensure that MY30 runs, because every user or customer who uses MY30 needs a subsidy of RM170. However, only RM115 million has been allocated. Next, I would also like to ask the Honourable Minister regarding the Southern VEP of RM6 million, what is its purpose? Also the northern foreign vehicle permit and road charge operations, is that the Northern VEP, which takes an expenditure of RM10.6 million? I would like to ask the Honourable Minister, has the Northern VEP been implemented? If it has been implemented, which company is responsible? Finally, for code 60000 - Urban Public Transport. The allocation for 2020 was only RM13 million but next year it has been increased to RM521 million. A very sudden increase. I would like to ask, what are the projects under urban public transport. Thank you.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Honourable Kuala Krai.

Bismillaahir rahmaanir rahiim. Thank you, Mr Chairman. I would like to touch on Item 020300 - Road Transport. The Road Transport Department (JPJ) is one of the agencies that is very much needed in resolving matters such as vehicle tax, licence renewal and so on. I propose that a counter be set up for the people of Kuala Krai. The people of Kuala Krai currently have to go to Machang, a distance of about 30 kilometres, or to Gua Musang, which is 110 kilometres away, to settle related matters. In addition, the time needed to settle matters requires a long time. I am informed that some have to wait up to three hours. Mr Chairman, referring to the same item. I propose that the government hold a major promotion for those who have summonses exceeding 10 years. It may be possible to reduce them by up to 90 per cent to attract these groups to pay. If this promotion succeeds, the benefit will be enjoyed by both parties, namely the users who can settle their outstanding summonses and of course the government, because it can increase national revenue compared with summonses that remain hanging. I would also like to ask, are there any guidelines for cyclists who use main roads? What is the government's plan to make them safer and not disrupt motor vehicles? I would also like to obtain information, are GrabFood motorcycle riders given courses or are they only selected by the company? Does the government have a proposal to provide special courses for them so that their riding is more orderly and safer for themselves and also for other road users? Mr Chairman, I would like to touch on Item 030400 - Uneconomic Train Subsidy (KTMB). There is an increase. Congratulations to the Honourable Minister, an increase of over RM62 million. The Train To Dabong phenomenon, which has made the Dabong district the focus of all of Kelantan, and indeed the whole country. Every weekend, five additional carriages are added to accommodate these domestic tourists to Dabong, especially during the COVID-19 pandemic period and this restricted movement.

I propose to KTMB that it hold wider promotions to raise users' interest in using train services to other routes, including to Kuala Krai station or so on. This is because there are also places here that can attract tourists. For example, hold lucky draws, mystery prizes and so on. The prizes could be made of replicas of trains, train engines or so on. This promotion aims to increase the use of trains as one of the public transport options, while also boosting the domestic tourism sector. Mr Chairman, I would like to touch on Item 030500 – Public Level Crossing. I would like to ask about the road crossing rent within estate areas, paid to estate management, which has risen sharply compared with before, causing the estates to close roads to users because of the very high increase in rent. This closure means the route cannot be used to cross to the other side, because there are many existing village areas that have been there for a long time. I am informed this issue only occurs in the East Coast states. Referring to the same item, what is the status of residents living on railway land? Is it true that there are agents who collect rent from residents on behalf of the Railway Assets Corporation (RAC)? This causes land rent to become expensive because it has to go through middlemen. I am informed this issue only happens in Kuala Krai. Is that true? I seek an explanation from the Honourable Minister. Mr Chairman, Item 020100 – Land Public Transport Agency. What is the government's plan to help taxi drivers whose business is getting sluggish, especially in the state of Kelantan? Is there any special assistance? An example I can mention here is free tyre assistance and so on for taxi drivers. Most of these taxi drivers are among retirees. Military pensioners or others who have to work to earn a living. The last item, Mr Chairman, is Item 020600 – Civil Aviation Authority. My question is whether the government does not intend to hold discussions with civil aviation companies to introduce passenger takaful as an alternative to conventional insurance for users who take civil aviation flights? I feel that the time has come for users to be given a choice, as with car and motorcycle insurance. I am confident that Muslim users will choose takaful because it is in accordance with the syariah. Thank you, Mr Chairman.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Thank you. Honourable Ledang.

Thank you, Mr Chairman. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace to the Honourable Minister and my fellow Members of this House whom I respect. I wish to focus more on development expenditure because in the expenditure or Budget 2021, I see there is an increase from the 2020 estimate of RM1.85 billion to RM4.17 billion. Therefore, I would like to touch on several matters relating to development. The first is Item 01600 – Purchase of KTMB Rolling Stock. In the expenditure that has been shown, there is an increase from RM164 million to RM340 million. I seek an explanation from the Honourable Minister. Why is the allocation for this item quite large? This is because, as reported, KTMB wants to acquire rolling stock without using government funds. That is, KTMB is said to want to implement a private financing initiative financing model, an open tender scheme to the private sector. So what is the reason this item is large in amount? The second is regarding Item 00900 – Enhancing KTMB's Capabilities. In the expenditure for 2021, there is a reduction from RM3.49 billion to RM2.62 billion. I seek an explanation from the Minister regarding the justification for reducing this allocation. We are well aware that the government is also currently bearing KTMB's funding gap with an allocation of RM150 million. However, I ask the government to re-examine the allocation for KTMB. I am informed that the government has had to release a large allocation given KTMB's financial situation, which is said to be critical due to COVID-19. I would like to propose that the government establish a specific plan to address KTMB's financial problems, considering the government is releasing large allocations for KTMB so that we can strengthen KTMB's services and at the same time help the people. The third matter is regarding Item 60000 – Urban Public Transport. Earlier, the Honourable Seremban also mentioned the details regarding this item because there is a large increase in allocation from RM13 million to RM521 million. I would like to ask, is rural public transport not being given attention? This is because this is urban public transport, but is rural public transport not being given attention? This is because there is no item in the ministry's estimates regarding rural public transport. I have experience. I have taken the Bas Muafakat Johor, which is under the state. I see there are many benefits, so there should also be allocation given to rural public transport, especially to help people facing transport problems. Furthermore, I would also like to ask, does this allocation include allocation for the development of e-hailing public transport? I would like the Minister to explain the government's position on the issue that has been raised to me regarding the wrongful termination of e-hailing drivers by e-hailing companies. This has happened, for the Honourable Minister's information. Since they do not have a specific medium for drivers to bring this problem forward, and there are no legal action efforts, and indeed legal action would incur costs, what avenue is there for them to obtain redress? The next matter is Item 031400 – Temporary Financial Assistance Programme for Stop-and-Go Buses. There is a reduction in this allocation from RM98 million to RM80 million. Although I see the amount of this reduction is not significant, are these not among the groups that need government support assistance in operational recovery? I seek an explanation from the Honourable Minister. And the last is Item 031500 – Stop-and-Go Bus Service Transformation Programme. There is no addition or reduction. This allocation appears to be the same. So, I seek an explanation from the Minister as well. Is the allocation for this programme sufficient given there is no addition to the allocation? Is the government considering expanding this transformation programme to bus services, including for rural areas? I am also from a rural area. Ledang is a rural area. Will this service be provided for rural areas that also have many residents? Thank you, Mr Chairman.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

Honourable Jelebu.

Thank you, Mr Chairman. I would like to touch on Item 031300 – Contract Staff Emoluments of SPAD. Among the earliest actions taken by the previous Pakatan Harapan Government was to abolish or dissolve the Land Public Transport Commission (SPAD). In June, SPAD was dissolved and replaced with APAD or the Land Public Transport Agency. Nearly three years after SPAD was abolished, the emoluments of SPAD contract staff are still in the operating expenditure of the Ministry of Transport. Moreover, the allocation given in 2021 has increased by more than RM15 million. My question, I would like to ask the ministry, why has there been an increase in this item? Who are the SPAD contract staff involved and what is the total number of them involved? What is the actual status of the abolition of SPAD? Has it been 100 per cent completed or is it still in a periodic abolition period? Of the total, Mr Chairman, the number of SPAD staff involved, those who were there before, how many staff were absorbed into APAD and how many staff had their services terminated? What was the actual cost incurred in the process of converting SPAD to APAD? Mr Chairman, Item 040600 – MH17 National Trial. A brief note on the MH17 national trial. The total allocation is RM23.320 million. Six years since the MH17 tragedy shook the nation. The Malaysia Airlines aircraft on its way from Amsterdam to Malaysia was shot down on 17 July 2014 in the conflict-torn areas of Ukraine and Russia.

The question I want to raise is, I would like to ask the ministry, what is the latest development in the investigation and trial of the MH17 case and to what extent has Malaysia been given the opportunity to play a role in this investigation and prosecution? There are several allegations stating that the Russian Government has tried to interfere in this case by using its veto power in the UN to thwart and disrupt the investigation process. To what extent is this allegation true? Also, how is the relationship between the Malaysian Government and Russia after this case occurred, and how has the Ministry of Foreign Affairs, particularly Wisma Putra, played a role in helping this case?

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Jelebu, a little. Batu Kawan here.

Sedikit sahaja.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

It is up to the Honourable Jelebu whether to give time or not.

Puan Kasthuriraani a/p PattoDAP · PHBatu Kawan

Sedikit sahaja.

Not much time. Please...

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

On the same issue, Honourable Member.

Wait, wait. Let me finish first.

Puan Kasthuriraani a/p PattoDAP · PHBatu Kawan

Baik.

Item 050200 – Procurement of Enforcement Equipment. Mr Chairman, under this Item, only RM500,000 is allocated for enforcement or enforcement officers. I want to explain how much can actually be approved with such a small allocation. I would like to propose to the ministry that all enforcement officers of the Ministry of Transport and the Road Transport Department (JPJ) be equipped with bodycams, as many enforcement officers in Western countries are. This is because, Mr Chairman, bodycams can serve as a reference when there are allegations from netizens or the public questioning cases involving the integrity of enforcement officers. Item 60000 – Urban Public Transport. Mr Chairman, the allocation under this Item is RM521 million. I want to raise several complaints from tour bus operators and excursion bus operators who are under very serious economic pressure now because they have loans and repayment periods with credit centres that are not covered by the moratorium allowed by the government. So I would like to ask, what action will the ministry take to help them? That is, if possible, I suggest that their loans be transferred from the credit centres to SMEs, for example, under another ministry. Or is there a plan by the Ministry of Transport to collaborate to restructure or harmonise their loans in order to help ease the economic pressure faced by these bus operators, Mr Chairman?

Sedikit, sedikit.

Yes, the Honourable Member for Jempol. Quickly, quickly.

Dato’ Haji Salim SharifUMNO · BNJempolEN

Thank you, the Honourable Member for Jelebu. I would like to ask the Honourable Member for Jelebu: does the ministry intend to introduce a monthly cost-of-living allowance of RM500 for taxi and rental car drivers throughout the country, including Sabah and Sarawak? This is because they have been severely affected. Previously, during the PENJANA package, 33,000 taxi, rental car and tourism drivers received RM600. Secondly, those who borrowed cars from credit companies are also directly involved in this matter. What is the Honourable Member's view?

Mr Chairman, it is included in the text of my speech. Finally, Mr Chairman, I would like to touch on Item 020600 – Malaysian Civil Aviation Authority. For the record, Mr Chairman, AirAsia has terminated 10 per cent of its staff out of 24,000 employees. Malindo has also terminated around 2,200 of its staff. My question to the ministry is, what form of assistance or measures has the ministry taken to ensure the welfare of those who have been dismissed from these airlines so that they can continue their lives? This is because many of them are young people who no longer have a source of income. Secondly, Mr Chairman, has every form of compensation they are entitled to been implemented, fulfilled and settled by the companies concerned? Thank you, Mr Chairman.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

The Honourable Member for Sepang.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you, Mr Chairman. I will go straight to Item 031400 – Temporary Stage Bus Assistance Fund Programme (ISBSF). We know that in this allocation there is a reduction of RM18 million, from RM98 million to only RM80 million. I would like to ask the Honourable Minister. We know that stage bus companies were already finding it difficult even before COVID-19 because of heavy competition from e-hailing, LRT and so on. So now, with the reduction of allocation to them, does the Honourable Minister feel this is a form of persecution against them? Because if we look, for example, at the Harian Metro report of 28 January 2020, "Stage bus services in Kelantan paralysed". In a coincidental situation in Kelantan, the Kelantan State Government can raise the salaries of the Exco members there, while stage bus companies are paralysed. So how does the Honourable Minister feel when it is reduced to this RM80 million, will they not suffer?

Dr. Maszlee bin MalikBERSATU · PHSimpang RenggamEN

The Honourable Member for Sepang.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok Sena

[Bangun]

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Please, the Honourable Member for Pokok Sena.

Dato’ Mahfuz bin Haji OmarAMANAH · PHPokok SenaEN

Honourable Member, I would like to ask you this: what is the connection between the stage bus fund being paralysed and the salary increases for State Assemblymen and Exco members in the state of Kelantan? [Applause] What does the Honourable Member have to do with linking these? Later they will curse me. Later they will say, one bottle makes you drunk, and then they say three. [Laughter]

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

[Laughter] I will adopt his speech as my speech.

Dr. Maszlee bin MalikBERSATU · PHSimpang RenggamEN

The Honourable Member for Sepang, may I interrupt?

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

However, I think the connection is like this. In a situation where people are struggling, why are some people's salaries going up? That is all, actually.

Dr. Maszlee bin MalikBERSATU · PHSimpang RenggamEN

The Honourable Member for Sepang.

Siapa?

Dr. Maszlee bin MalikBERSATU · PHSimpang RenggamEN

I give way to the Honourable Member for Simpang Renggam.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

The Honourable Member for Simpang Renggam, please.

Dr. Maszlee bin MalikBERSATU · PHSimpang RenggamEN

Okay, thank you, the Honourable Member for Sepang. Mr Chairman, regarding the stage bus operators who are facing problems, I would also like to draw the ministry's attention to another group facing problems during this pandemic, namely rental car and taxi operators. I have had the chance to meet with rental car associations and the like, especially those in towns, villages and rural areas. They are greatly affected. So they have asked that it be conveyed to the ministry that one-off incentives be arranged for them, as given to fishermen and other parties. That is the first. Secondly, they also ask that joint efforts be made between the Ministry of Transport and the Ministry of Tourism, as tourism is now promoting local tourism, so that joint efforts with taxi and rental car operators can be made so that incentives can be given to those who are so squeezed at this time. Thank you, the Honourable Member for Sepang.

Tuan Mohamed Hanipa bin MaidinAMANAH · PHSepangEN

Thank you, the Honourable Member for Simpang Renggam. I ask that his speech be made part of my speech. For the information of the Honourable Minister of Transport, the official portal of APAD, the Land Public Transport Agency, regarding these stage buses, states: "Established to improve the quality of bus services and encourage the public to use buses as an effective mode of transport". So, Honourable Member, I would like to ask: by reducing this assistance, can we achieve the objectives outlined in this official portal? I think, Honourable Member, that stage bus transport really is suffering. Not only these buses, but now generally all bus companies, school buses, tour buses, generally all of them are facing problems. So with regard to these stage buses, they face the biggest problems. So I hope, Honourable Member, if possible, I do not know whether it can be increased or not, but something must be done to help stage bus operators because they really are facing problems, Honourable Member. They will meet the Member of Parliament to ask how they can be helped. So I hope the Honourable Member will show greater concern for the plight of these people. That is all, thank you.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

The Honourable Member for Sibuti.

Thank you, Mr Chairman. I will move directly to Supply Bill 28, Item 010200 – Maritime. I want to raise the issue and complaints from Sarawak concerning Malaysia Shipping Notice (MSN) 16/2020, which states that single hull single bottom tanker ships registered under the Malaysian flag are not permitted to carry oil as cargo regardless of the age of the ship.

Industry players such as the Sarawak Association of Marine Industries (SAMIN) and the Sabah Shipowners Association have expressed concern over 119 ships under the association that are affected, since the government has imposed a ban on single hull, single bottom ships carrying cargo, especially oil, in rivers and coastal areas. I hope the ministry will state a view or position to grant exemption to these shipping industry players because they carry cargo supplies for the needs of the community, especially oil supplies, and are also involved in the palm oil industry. Apart from that, I would like to move on to the development item, which is Development Bill 28, Item 60000 – Urban Public Transport. A few years ago, starting from 2017, the Sarawak State Government, the Honourable Chief Minister of Sarawak expressed the wish for Sarawak to develop a rail-based public transport system or LRT. The Sarawak government decided to develop ART as the technology to be adopted. Nevertheless, I feel the Federal Government has not given specific focus to helping the Sarawak State Government in developing rail public transport in Sarawak. Nevertheless, I have checked under the constitutional provisions under Article 74 and also the Ninth Schedule, List 10(b), which states that the development of railways falls under the powers of the Federal Government. The Honourable Minister has full power to decide on the development and research of these railways, with permission, in Sarawak, under the powers provided by the Railway Act 1991 under section 1(1). Hereby I request that the government, through the large allocation I see under this urban transport item, enable the Federal Government to help the Sarawak State Government by sharing, to some extent, information or technologies, and also by providing allocation to add to the allocation provided by the state government. This will further enhance the public transport industry across the country, and I hope that with this Item 60000 it will not focus only on urban public transport or be too Kuala Lumpur-centric. I hope this budget allocation can be channelled to urban and rural public transport development as was said by the Honourable Member for Ledang. Apart from that, I also agree with the view of the Honourable Member for Jempol regarding Item 031400 – Temporary Stage Bus Assistance Fund Programme (ISBSF). I have received many complaints from taxi drivers and rental van drivers from rural areas about the need for the government to provide at least a one-off assistance in the 2021 Budget. As the Honourable Member for Simpang Renggam said just now. Many of those who have only recently bought these rental vans have to bear the burden of paying monthly instalments for these buses or rental vans. Therefore, I once again urge the government to consider providing a one-off assistance to these taxi drivers. Lastly, it concerns Item 031500 – Stage Bus Service Transformation Programme (SBST). An allocation of RM48 million is provided. Nevertheless, I want to ask about the statement by the Honourable Minister of Finance regarding support for hydrogen buses in Sarawak. Can this allocation be used to help develop hydrogen gas in Sarawak? That is all, thank you, Mr Chairman.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

The Honourable Member for Kalabakan.

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Thank you, Mr Chairman. I would like to touch on Item 020400 – Sabah Commercial Vehicle Licensing Board. Last July, police personnel from the Kalabakan Police Station and Company B of the 14th Battalion arrested 11 undocumented migrants who were transported by a school van via a rat trail route. The migrants, who did not have personal registration documents, were suspected to have been transported from an oil palm estate in Kalabakan, and two local citizens were arrested. The involvement of the two school van drivers is feared to have stemmed from the pressure of their lives in seeking financial resources. Following this incident, my question is: what form of monitoring is being and will be carried out by the Sabah Commercial Vehicle Licensing Board (LPKP Sabah) in curbing the activity of trafficking undocumented migrants, which is certainly masterminded by certain parties who take advantage of the hardships of licensed school bus operators and drivers? With the existence of the Recalibration Plan for Undocumented Foreign Workers (PATI), which allows them to work in the plantation and construction sectors, what enforcement strategy does LPKP Sabah have to prevent any form of invisible mobility of undocumented migrants who do not follow the specific procedures set by that Recalibration Plan for Undocumented Foreign Workers (PATI) to work on oil palm and rubber estates throughout Sabah? What form of integrated enforcement between LPKP Sabah and ESSCOM and other local enforcement agencies will be emphasised in preventing the involvement of operators and drivers of passenger vehicles such as factory vans used by certain parties, especially estate towkays, to transport PATI from the maritime border? In addition to the Prihatin National Assistance (BPN) of RM600 that benefited about 350 bus drivers in Sabah, what is LPKP's plan for 2021 to ensure that school closures and the gloom in the tourism sector due to COVID-19 do not become the end of the livelihood of public vehicle drivers, especially school vans and tour buses? Furthermore, I would like to touch on Item 031200 – Maintenance of the AwAS System. Since the Automatic Awareness Safety (AwAS) System was first introduced during the Barisan Nasional administration, not a single AwAS camera has been installed on Sabah's roads. As admitted by the former Minister of Transport, the Honourable Member for Seremban, the cost of installing one AwAS camera is estimated at around RM250 thousand. No new AwAS camera installation was carried out during the Pakatan Harapan Government. The MOT agreement during the Barisan Nasional era with the company selected for AwAS installation works is doubtful. Does the reduction of RM1.04 million in that allocation mean the existing AwAS cameras will be reduced? If yes, does the ministry intend to install AwAS cameras on urban roads in Sabah, especially those where accidents are frequently recorded? If not, what technological system will the ministry implement to establish an automatic traffic monitor like AwAS on urban roads in Sabah? Who will audit every maintenance work of the AwAS cameras? What assurance does the ministry have that the audit carried out by that party is truly continuous and not influenced by the Honourable Minister, the Honourable Deputy Minister or any influential party? How is the selection or appointment of maintenance implementers or contractors made, and what selection processes must be undergone by any contractor who wishes to take on maintenance work? Next, I would like to touch on Item 01400 – Sabah State Railway Repair Project. The increase in allocation of RM13 million compared to 2020 is due to the major floods in Sabah last June, when the railway route from Tenom to Halogilat was temporarily closed due to severe track damage. There was a plan by the Warisan-led Sabah State Government at that time to build a railway route from Kota Kinabalu to Kudat. What form of railway track improvements in Sabah will be implemented in 2021? Especially in enhancing safety and operational efficiency so that track damage like that which occurred during the major floods in mid last year does not happen again? What is the ministry's strategic plan to make the existing railway system in Sabah capable of operating not only to carry passengers but also cargo, especially manufactured products that face difficulties being transported by land transport? What form of support will the ministry give to make the construction of the Kota Kinabalu to Kudat railway, as previously proposed by the Sabah State Government, a success?

Tuan Ma’mun bin SulaimanWARISANKalabakanEN

Will the ministry use the allocation under this Item to carry out a feasibility study before any Sabah railway track construction project is started? Thank you.

Mr Chairman (Dato’ Sri Azalina Othman Said)EN

The Honourable Member for Rompin.

Thank you, Mr Chairman. I wish to raise Head 06000 – Repair and Construction of Jetties on islands and also at river mouths. We find that on islands, jetties are a very important means of transport. This is not only for the general public but also for tourists who come to the islands, especially in my constituency of Pulau Tioman. I would like to know the status of the projects that had been approved earlier and were in the tender process but were cancelled when the Pakatan Harapan government came to power, namely the construction of a jetty at Kampung Salang, Pulau Tioman, the repair of the jetty at Kampung Juara, and the construction of a jetty at Kampung Mukut. For Pulau Tioman, the tourism industry is very important to the Pulau Tioman community. So, without the construction of jetties that meet good standards, it may endanger not only the local community but also the tourists. There have been several occasions when tourists have had their feet trapped, or other incidents have occurred, due to the very poor maintenance of jetties. [Deputy Speaker (Dato' Mohd Rashid Hasnon) chaired the Committee] I propose that all jetties on islands throughout the country should be coordinated, and all of them should be placed under the Marine Department. There should not be state jetties or district council jetties, as the ability of states to maintain jetties is indeed limited. If the construction of all jetties were placed under the supervision of the Marine Department, it would make it easier for the Ministry of Transport to make allocations for maintenance every year. If we look at next year, only RM16 million has been allocated to maintain jetties across Peninsular Malaysia. Imagine how many hundreds of jetties there are in the whole country! A sum of RM16 million is a very, very small allocation when compared with the existence of all the jetties. On Pulau Tioman alone there are five jetties, and this excludes Pulau Rawa and several other islands. Secondly is the coordination of sea transport ticket fares. I would like to know whether there is some form of control or some form of rate set by the government. That means ferry operators cannot arbitrarily set prices for jetty transport, for sea transport. It must be approved either by the Marine Department or the Ministry of Transport in determining fares. For example, from Mersing to Pulau Tioman, what is the rate; from Tanjong Gemok to Pulau Tioman, what is the rate. It must be fixed, in line with certain rates, such as to Langkawi and so on. So I hope these ticket fares must always be under the control of the Marine Department or the Ministry of Transport itself. That is all I wish to raise under Head 06000. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Rompin. Now I invite the Honourable Tanjong. Please, Honourable Tanjong.

Tuan Chow Kon YeowDAP · PHTanjongEN

Thank you, Honourable Mr Chairman. I wish to touch on B.28 – Land Public Transport Agency, specifically in relation to the Bayan Lepas LRT project, of which the Honourable Minister is also aware. I would like to express thanks for the conditional approval for the Komtar to Bayan Lepas International Airport alignment. However, there are still several technical issues to be finalised. What is the national public transport policy today? Perhaps the Honourable Minister could answer in relation to the Federal Government's responsibility to finance rail projects, as we see that many rail projects in the Klang Valley are financed or supported by the Federal Government. However, in the state of Penang, the Bayan Lepas LRT project is not financed by the Federal Government. I would like to know from the Honourable Minister, what are the conditions for enabling the Federal Government to finance the project in question? What is the ministry's position on the state government's application to implement this project under the Twelfth Malaysia Plan (RMKe-12), which has been raised many times in stakeholder engagements between the state government and the federal ministries? Moreover, in relation to the state government's application for the Federal Government's support to allow the state government to obtain loans or issue bonds for the purpose of bridging finance for this project, it has not been supported by the Federal Government. On one hand the Federal Government does not finance, but on the other hand it does not give support to the state government to finance by itself through bridging finance, as well as the reclamation of islands in the southern part of Penang. So I hope the Honourable Minister can also give an answer to this issue. Another issue, Mr Chairman, is P.28 Head 60000 – Urban Public Transport. I see that the Penang state ferry service is also a type of urban public transport. We are well aware that the Federal Government has decided that the ferry service will be taken over by Penang Port Sdn. Bhd. Thank you, Honourable Minister, for having met with the state government and also for requiring the Penang Port Commission and Penang Port Sdn. Bhd. to engage with the state government on the latest developments of the plan for a new ferry service to replace the existing ferries. For the information of the House, the parties concerned have already given notice and a briefing to the state government last week, and the issue raised is that the iconic ferry will be discontinued and replaced by catamarans only, with no room for vehicles as before. So this will create a major issue, in that vehicles that currently use the ferry will have to use the Penang Bridge. Only motorcycles and trishaws are permitted in the transport service that will be implemented starting mid-2022.

Tuan Chow Kon YeowDAP · PHTanjongEN

So I hope the Honourable Minister will re-evaluate and allow the ferry as before to be rebuilt anew, so that vehicles that use the ferry can use the new ferry that will be ordered by the ministry or Penang Port Sdn. Bhd. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Tanjong. Honourable Member, I now invite the Honourable Minister to reply for 15 minutes. Please, Honourable Minister of Transport.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNMinister of Transport · Ayer HitamEN

Thank you, Mr Chairman. Thank you to the nine Honourable Members, and three others who interjected during the debate, on the scope and expenditure of the Ministry of Transport. For the information of the august House, the Ministry of Transport Malaysia has been entrusted to continue to be the catalyst of national development by empowering transport systems for the land, air and maritime sectors, based on technology. Therefore, through Budget 2021, MOT was allocated a budget of RM6.052 billion, covering operating expenditure amounting to approximately RM1.877 billion or 31 per cent and development expenditure amounting to approximately RM4.175 billion or 69 per cent of total expenditure. The allocation approved in Budget 2021 increased by 67.5 per cent compared with Budget 2020, which amounted to RM3.614 billion. For operating expenditure, the approved allocation increased by 6.7 per cent, from RM1.758 billion to RM1.877 billion. Meanwhile, development expenditure increased by 125 per cent, from RM1.855 billion to RM4.174 billion. MOT believes the increase in Budget 2020, MOT, is to be in line with the National Transport Policy 2019–2030 which has been launched, which becomes the cornerstone of sustainable and efficient transport development. Pillar two of the National Transport Policy is to optimise development, build and maintain network service infrastructure to maximise efficiency, aiming to create multimodal transport network facilities and strengthen the maintenance regime for transport infrastructure. Under operating expenditure, approximately RM729 million or 38.8 per cent is allocated for the operation of MOT agencies and also the implementation of subsidies. Some RM597 million or 31.8 per cent is for services and supplies. Approximately RM547 million or 29.2 per cent is for payment of emoluments, and the remaining balance is used for the purchase of assets and other payments such as taxes and so on. A total of RM514 million or 27.4 per cent of the overall MOT operating allocation has been allocated for public transport subsidies covering land, rail and air public transport, among them the Rural Service Subsidy (RAS) and the Uneconomic Train Subsidy (TTE), as raised by the Honourable Kuala Krai. This subsidy aims to ensure connectivity between urban areas and rural areas to improve accessibility and mobility, with the permission of the people, and also as a catalyst for the socio-economic activities of the nation. MOT listens to the grievances and hardships of the people facing the increasingly challenging cost of living. Public transport subsidies are also aimed at reducing the burden of living costs borne by the people by ensuring transport services continue to be provided in areas that are not profitable for operating companies, through the implementation of the Uneconomic Train (TTE) totalling RM45 million. The Interim Stop-Bus Support Fund (ISBSF) programme totalling RM80 million. The Stop-Bus Service Transformation (SBST) programme totalling RM48 million. Unlimited monthly pass incentives My100 and My50 totalling RM115 million. The Skypark Link train service totalling RM15 million and the Pas Mutiara for northern residents totalling RM2 million. Under development expenditure, the ministry ensures the objectives of the Budget 2021 strategy will be achieved, namely the objectives of people's well-being, business continuity and economic resilience. Specifically for development projects in the First Rolling Plan (RP1) of 2021 of the Twelfth Malaysia Plan, the ministry has received an allocation of RM4.175 billion. The allocation is for the implementation of a total of 78 development projects covering 20 new projects and 58 continuing projects. A sum of RM766 million or 18.35 per cent has been allocated for 20 new projects, and RM3.409 billion or 81.65 per cent is allocated for 58 continuing projects, to ensure all development projects that are planned and ongoing can be implemented within the stipulated period. Through this allocation, the development of transport infrastructure can be continued, in particular providing an efficient and effective public transport system. The people will get to use transport services that are comfortable and reliable for all transport sectors, namely land, air and maritime. Accordingly, the development expenditure allocation under this ministry of RM4.175 billion is divided into eight categories as follows: First, rail projects were allocated the highest, namely RM3.21 billion or 76.9 per cent, for the implementation of rail projects covering rehabilitation and strengthening works for the East Coast Railway Line, enhancing the capacity of KTMB, the Sabah State Railway Repair Project and the purchase of KTMB rolling stock. Urban public transport raised by the Honourable Seremban and several other Honourable Members, allocated RM521 million or 12.48 per cent, is for infrastructure construction works such as the RTS Link which has just been signed with Singapore, namely an allocation of RM500 million for next year, and in addition the remaining 21 per cent is for the provision of park and ride facilities that provide comfort to public transport users, a project which is ongoing. Air transport projects allocated RM195 million are for construction and upgrading works for airport infrastructure as well as the development and upgrading of air traffic control and management, communications and radar systems. Maritime transport projects were allocated RM148.5 million for dredging works for shipping channels, repair works, construction of Marine Department of Malaysia jetties, repair and construction of office complexes and equipment systems for the Marine Department of Malaysia. So, as raised by the Honourable Rompin just now, where the allocation for us to maintain jetties is only RM16 million, and in addition one of the largest components is dredging. I give an example: at Kuala Perlis we allocated RM17 million for dredging works because of siltation. Otherwise that jetty cannot be used. Likewise at the Kuala Kedah jetty with RM19 million, at Lumut with RM50 million and – RM39 million, and in Sarawak RM50 million. These are among the dredging works that we need to carry out because of the very frequent siltation. Fifth, the buildings and administration of the Ministry of Transport were allocated RM55.8 million to cover development payments of the ministry and agencies. The road development project was allocated RM25 million to upgrade or build offices, equipment and computerisation systems for the Public Transport Department and the Road Transport Department (JPJ). Engineering research and development was allocated RM18 million for the proposed high speed weight emotion user project for automatic and continuous vehicle data collection and enforcement against overloading offences for heavy vehicles across various states.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNMinister of Transport · Ayer HitamEN

Industrial Collaboration Programme (ICP) Management Unit (IMU), Ministry of Transport, allocated RM1.2 million. The Ministry of Transport will identify methods to expedite the implementation of continuing projects and ensure new projects can be implemented next year. To answer the issues raised by the Honourable Members, I will do so one by one. The Honourable Seremban raised the RCVEP, namely in the northern part. For the information of the Honourable Member, the Cabinet has decided that for the Northern Zone, we introduce it but it will not be done by direct negotiation. It will be done through an open RFP tender. So, the planning and implementation work will be carried out next year, and this is the allocation provided for us to begin the RCVEP at the northern level. As for the allocation of RM6 million for the RCVEP phase one southern, it is for the purchase of RFID tags for VEP, namely the registration of VEP for Singapore vehicles. The Honourable Kuala Krai, meanwhile, raised the CAAM. Consultation on passenger takaful for air passengers.

Tuan Loke Siew FookDAP · PHSerembanEN

Honourable Member. Mr Chairman.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Just a moment. Whether passengers take up takaful or conventional insurance is the decision of the passenger themselves. The government encourages all passengers to contribute to or purchase insurance according to their ability and the type of coverage required.

Tuan Loke Siew FookDAP · PHSerembanEN

There is a question I raised that has not yet been answered.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Just a moment, just a moment. I am not– because this one is different, I will answer within the Head first, and at some other time I will answer the others. The Honourable Jelebu raised the matter of MH17. Because in the Head we have RM23.32 million for the ongoing trial case. For the information of this August House, we have borne 30 per cent of the cost of the trial, amounting to RM23 million. We want to ensure that whoever is guilty will be charged in court. The court process is still ongoing, and initially the Dutch authorities conducted the investigation through the Dutch Safety Board for the technical aspects and then the JIT for the criminal elements. Both of these are in fact in the court process. Our purpose in spending this cost is because this is a Malaysian aircraft. We want to ensure that those who committed this offence will be brought before the courts of justice.

Tuan Pengerusi.

Kemudian...

Honourable Minister, may I have a moment, Honourable?

Boleh.

Honourable Minister, just regarding MH17 earlier, I would like to ask for the ministry's explanation on the expenditure of this RM23.320 million, Honourable Minister, what is it for? Secondly, Honourable Minister, one moment, because earlier you had explained about SPAD. Is there any plan by your ministry to exempt the PUSPAKOM, GDV and licence fees for e-hailing drivers? They have lost almost 80 per cent of their income, Honourable. If the ministry could help those involved, e-hailing and so on, to be given PUSPAKOM, GDV and so on for free. Thank you, Honourable.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Just a moment, Honourable. I have not reached that one yet, Honourable.

Dr. Maszlee bin MalikBERSATU · PHSimpang RenggamEN

Honourable Minister. Just like the e-hailing issue earlier, I also bring up the issue of taxi drivers and rental car drivers. Thank you.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Honourable, this is still lengthy. I am trying to answer earlier about MH17 in the Netherlands. So, this is APAD in Malaysia, settle this matter, RM23 million, this is for legal and court costs. As I said, 30 per cent is borne by Malaysia, and this is the cost that should be borne by Malaysia. That is the allocation for next year for this purpose. The Honourable Member also raised the question of how we can help public transport operators or operators. We try our best, first we fight for them to receive a one-off assistance. Initially only taxi drivers received RM600 and then we expanded it to e-hailing drivers, who also received RM500, and we gave it to everyone. After that, we also heard appeals from bus drivers, school buses and so on. We have also given all of these as one-off payments. There were appeals, made through Members of Parliament, that it be given monthly like for fishermen. I think this matter needs to be raised with the Ministry of Finance. So, it is not for the ministry to be able to give such amounts. This is because we have other means, such as how can the Ministry of Transport help? We have passed a COVID law, whereby we allow these vehicles to be converted to carry goods. There is no problem. So, not only carrying passengers but as a transport that can carry goods to lighten their burden. That is not a problem. So, in terms of PUSPAKOM inspections, it is a body that has been given a concession. So, if they want to do it on a CSR basis, I have no problem with that.

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

However, this is...

Yang Berhormat.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

...between PUSPAKOM and the e-hailing side.

Honourable Member, regarding PUSPAKOM fees, GDV and so on, and PSV licence fees and so on. Although concessions have been given, I suggest that the ministry formulate a policy so that those involved in e-hailing and similar services are granted exemptions, Honourable Member. This is because it is an issue that affects many of them.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Thank you, Honourable Member.

Terima kasih.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

I would like to announce that, for this Covid period, I am extending the age limit of public service vehicles automatically by one year. What does this mean? Previously, once a vehicle reached 10 years of age, it could no longer be used; now it can be extended by one year. We will see how the situation develops; this is one example. Otherwise, they would have to change their vehicles, and they do not have the money. So this is within the capacity of the ministry; it is the power we have to extend their age limit. Previously, it was subject to stricter inspection, but at least we are extending the age limit to help them. I think many taxi operators understand, and I must inform the Honourable Members about the summonses just now. In fact, many may not know that we gave a 70 per cent discount for two months. We extended it twice. So, it seems the response has been good. Why did we do this? I have already informed this august House. Previously, I found that there were 300,000 people whose summonses they could not pay. They said, "I want to deliver food, but my application for GrabFood was not allowed; my licence cannot be renewed." Seeing this situation during the MCO, it's alright, we give them 70 per cent off. Previously, they had to pay a summons of RM500; now it is only RM150. They pay it, and they can make a living. So, on that basis, we help. So, in difficult circumstances, we help them, we give them relief. The Honourable Member asked for 10 per cent, which is a 95 per cent discount; that has never been done before. However, if there are certain urgent cases, we will discuss how to help, but each case must be considered on its own merits. Except, if the case has been brought to court, that is not possible. So, I think in this situation, we are ready to help; we listen to their cries, but let there be a genuine case for us to help every public transport operator in this matter.

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister, a little.

Honourable Minister, just a little more.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Honourable Minister.

Regarding the bus operators just now.

Tuan Karupaiya a/l MutusamiPKR · PHPadang Serai

Saman, saman.

Tour bus operators. Tourism bus operators who are involved with the loan credit just now.

Okey.

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

I ask the Honourable Member– patience is part of faith. Let me read quickly, so that we understand.

I am being patient, alright. [Laughter]

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister, the e-hailing issue.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Okay, Honourable Member.

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister, a little... [Loudspeaker switched off]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Minister, my– time is up, do you need extra time? Five more minutes. I can give you more time.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

Honourable Minister, regarding summonses, a little more, please.

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister, a little on e-hailing.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

It's alright. If the Honourable Member– I am not running away; afterwards, whenever, you can look for me.

Tuan Karupaiya a/l MutusamiPKR · PHPadang Serai

Bukan apa...

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

I just want to read out those who debated...

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister, regarding...

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

...if no answer is given, it is not right.

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

...e-hailing companies that run their business without business licences. They are robbing the legitimate money of legal e-hailing companies. So, as we saw last year, JPJ (Road Transport Department) arrested one company...

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Honourable Member, this was not raised in the debate, but I understand, Honourable Member.

Puan Kasthuriraani a/p PattoDAP · PHBatu Kawan

Yes.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

For e-hailing companies that commit such offences, we are taking action. Recently, action was taken in the northern region, in Kuantan; we have already taken action against these companies. This is very important...

Puan Kasthuriraani a/p PattoDAP · PHBatu KawanEN

Honourable Minister, preventive measures; I want to know the preventive measures. Because JPJ indeed sets up road blocks and they try to...

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Wait, wait. Let me finish, Honourable Member. I want to finish this.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

I ask that the Minister first finish his answer.

Okey.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Batu Kawan and the Honourable Member for Padang Serai, please wait, Honourable Member.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

The Honourable Member for Ledang raised the matter of RTS, which I have already mentioned. Just now, the matter of wrongful termination was said to be something that can be referred to the Ministry of Human Resources. There is already a precedent now, and that case was brought to court. Then the Honourable Member for Ledang also raised the same point, and the answer I gave to the Honourable Member for Seremban applies. Next, the emoluments of SPAD contract staff: the contract extension from 1 January 2021 to 31 December 2022, for two years, for the 596 staff involved. Then the Honourable Member for Jelebu also asked about cases. These cases have already been discussed just now, the Dutch case. Why was the ISBSF allocation reduced? It was formulated based on the performance of claims and payments to the operating company, or operator, of ISBSF from 2019 to 2020. This means the trend is decreasing. So, when discussed with the Ministry of Finance, it is a trend, and we use that projection to give claims based on what we have projected. Then there is the prohibition on single hull and single bottom vessels. I am pleased to inform the Honourable Member for Sibuti that this matter has been resolved. Yes, that is true. When there was a circular from MSN 16, it restricted us so that we could not prevent oil pollution problems in areas such as the Straits of Malacca and others. We must avoid that. Therefore, we have long used the double hull, double bottom method so that the collision does not leak directly and the oil does not spill. Therefore, that principle is what we want to uphold so that there is no pollution. I would like to inform the Honourable Member that the Sarawak Minister of Transport did discuss this with me. They also have the State Merchant Shipping Ordinance. So when I heard their statement, they said most rivers carry diesel. However, what we want to avoid is high grade oil. That is what causes the most pollution. So a decision has been made. Discussions have been held, namely that for Sarawak, on the rivers used for transporting these goods, there is no problem. However, it cannot be done at the port hub, namely at Bintulu. In the open sea, we do not allow it. Likewise the Straits of Malacca, the South China Sea, all of these are not allowed. As for river transport areas, it is limited to diesel, and also to those delivering food and essential goods. That is not a problem. So, this matter has been cleared. The Honourable Member for Kalabakan earlier mentioned LPKP, monitoring PATI. I want to say, if any operator has obtained a licence from APAD Sabah and they are involved in human trafficking, that licence can be revoked. If there are elements of crime, we can take action immediately and ask the police to investigate. I think this is a very direct matter; there is no problem. Another matter raised by the Honourable Member is regarding Penang, which the Most Honourable Chief Minister raised just now. I want to tell the Most Honourable Chief Minister that, as a policy, we welcome the state government discussing with UPE (Economic Planning Unit) and also the relevant authorities regarding the use of DE or development allocations. So I think the state government has held discussions. Once approved by UPE, it will be handed over to our ministry as a technical ministry. Whether it is PFI or whether funds are used through DE or any other means, there is no problem. We are the implementing agency. So that is not a problem. Regarding these bonds, I think the Honourable Minister of Finance answered the other day about the bonds requested by the state government. I will not repeat. Finally, the Honourable Member asked about ferry services. As I have discussed with the Most Honourable Chief Minister, the ferries we have now are 47 years old. Even finding spare parts is no longer possible. So we have to use catamarans. This too was decided in 2019, during the time when the Honourable Member for Bagan was Minister of Finance, that we would use catamarans. So I want to inform the Honourable Member that the number of passengers using the ferry service is 1.5 million passengers a year, of which 1.2 million are people, and only under 200,000 are cars. So I think in this matter, since we already have the first and second bridges, this issue can be eased through the existing system. That's all. To the Honourable Members, there are many more issues that I cannot relate one by one...

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Give it in writing.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

So I will give it in writing. I thank all the Honourable Members who took part in the debate.

Tuan Karupaiya a/l MutusamiPKR · PHPadang SeraiEN

A little, a little, Honourable Minister. It involves summonses.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

That is all, thank you.

Tuan Karupaiya a/l MutusamiPKR · PHPadang Serai

Saman, saman.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Minister. Time is up for this debate. Honourable Members, the question is that the sum of RM1,877,499,100 for Head B.28, Operating Expenditure Estimates 2021, forming part of the Schedule, be agreed to. [The question was put for decision]

Tuan Loke Siew FookDAP · PHSerembanEN

Mr Chairman, I stand to ask for a division because the Honourable Minister did not answer the question. [More than 15 Members stood to request a division]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Alright, thank you. Honourable Members, since more than 15 Members have stood requesting a division, in accordance with Standing Order 46(4), I order that a division be held now. Secretary, please ring the bell for two minutes. [Bell rung]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Members, before I suspend this House, I would like to name who is in which block, the vote counters and the observers. Block A – the vote counter is the Honourable Member for Kota Bharu, the observer is the Honourable Member for Tanjong Malim. Block B – the Honourable Member for Rembau, the observer is the Honourable Member for Batu Gajah. Block C – the vote counter is the Honourable Member for Tasek Gelugor, the observer is the Honourable Member for Kangar. Block D1 – the vote counter is the Honourable Member for Arau, the observer is the Honourable Member for Hulu Langat. Block D2 – the vote counter is the Honourable Member for Kluang, the observer is the Honourable Member for Sabak Bernam. Block E1 – the vote counter is the Honourable Member for Muar, the observer is the Honourable Member for Pasir Mas. Block E2 – the vote counter is the Honourable Member for Lumut, the observer is the Honourable Member for Jempol. Block F – the vote counter is the Honourable Member for Permatang Pauh, the observer is the Honourable Member for Pontian, and Block G – the vote counter is the Honourable Member for Sungai Petani, the observer is the Honourable Member for Sibuti. Honourable Members, as per the ruling made on 5 November 2020, I suspend the sitting of the House for 10 minutes.

[The sitting was suspended at 1.40 pm]

[The sitting resumed at 1.50 pm]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

[Mr Speaker chaired the Committee]

Mr ChairmanEN

I invite the chief vote counters to take their respective positions. I also invite the observers to vote first before observing at the designated chief vote counters' positions. Honourable Members who are observers are requested to vote now. If everyone is ready, the vote is now taken.

[The House divided]

Mr Chairman

[Pengundian dijalankan]

Mr ChairmanEN

Honourable Members, the result of the vote is as follows: For 109. [Applause]. Against 94. [Applause]. Absent 17.

Bill — Supply Bill 2021 and Development Estimates Motion 2021 Committee — Members Who Agree:Bill

1. Honourable Tan Sri Muhyiddin bin Mohd Yassin (Pagoh) 2. Honourable Dato' Seri Mohamed Azmin bin Ali (Gombak) 3. Honourable Dato' Sri Ismail Sabri bin Yaakob (Bera) 4. Honourable Dato' Sri Haji Fadillah bin Yusof (Petrajaya) 5. Honourable Dato' Takiyuddin bin Hassan (Kota Bharu) 6. Honourable Dato' Seri Hamzah bin Zainudin (Larut) 7. Honourable Datuk Seri M. Saravanan (Tapah) 8. Honourable Datuk Seri Mohd Redzuan bin Yusof (Alor Gajah) 9. Honourable Datuk Seri Dr. Ronald Kiandee (Beluran) 10. Honourable Puan Zuraida binti Kamaruddin (Ampang) 11. Honourable Datuk Dr. Haji Abd. Latiff bin Ahmad (Mersing) 12. Honourable Tan Sri Datuk Seri Panglima Haji Annuar bin Haji Musa (Ketereh) 13. Honourable Dato' Sri Reezal Merican bin Naina Merican (Kepala Batas) 14. Honourable Dato' Dr. Shamsul Anuar bin Nasarah (Lenggong) 15. Honourable Dato' Sri Hajah Nancy Shukri (Batang Sadong) 16. Honourable Dato Sri Alexander Nanta Linggi (Kapit) 17. Honourable Dato' Sri Dr. Wan Junaidi bin Tuanku Jaafar (Santubong) 18. Honourable Dato' Dr. Mohd Khairuddin bin Aman Razali (Kuala Nerus) 19. Honourable Dato' Sri Ikmal Hisham bin Abdul Aziz (Tanah Merah) 20. Honourable Dato' Dr. Haji Noor Azmi bin Ghazali (Bagan Serai) 21. Honourable Datuk Abd. Rahim bin Bakri (Kudat) 22. Honourable Dato' Sri Dr. Haji Ismail bin Haji Mohamed Said (Kuala Krau) 23. Honourable Tuan Jonathan bin Yasin (Ranau) 24. Honourable Dato' Mohd Rashid bin Hasnon (Batu Pahat) 25. Honourable Dato' Sri Azalina Othman Said (Pengerang) 26. Honourable Datuk Seri Ir. Dr. Wee Ka Siong (Ayer Hitam) 27. Honourable Datuk Seri Panglima Dr.Maximus Johnity Ongkili (Kota Marudu) 28. Honourable Datuk Seri Rina binti Mohd Harun (Titiwangsa) 29. Honourable Dato' Sri Mustapa bin Mohamed (Jeli) 30. Honourable Dato' Tuan Ibrahim bin Tuan Man (Kubang Kerian) 31. Honourable Dato' Saifuddin Abdullah (Indera Mahkota) 32. Honourable Dato' Dr. Noraini Ahmad (Parit Sulong) 33. Honourable Datuk Seri Dr. Adham bin Baba (Tenggara) 34. Honourable Tuan Khairy Jamaluddin Abu Bakar (Rembau) 35. Honourable Dato' Seri Hishammuddin bin Tun Hussein (Sembrong) 36. Honourable Datuk Halimah binti Mohamed Sadique (Kota Tinggi) 37. Honourable Dato’ Eddin Syazlee bin Shith (Kuala Pilah) 38. Honourable Dato' Kamarudin Jaffar (Bandar Tun Razak) 39. Honourable Tuan Muslimin bin Yahaya (Sungai Besar) 40. Honourable Datuk Wira Hajah Mas Ermieyati binti Hj. Samsudin (Masjid Tanah) 41. Honourable Dato' Seri Dr. Santhara (Segamat) 42. Honourable Dato' Mansor Othman (Nibong Tebal) 43. Honourable Tuan Ali bin Biju (Saratok) 44. Honourable Tuan Willie Anak Mongin (Puncak Borneo) 45. Honourable Dato' Rosol bin Wahid (Hulu Terengganu) 46. Honourable Datin Mastura binti Mohd Yazid (Kuala Kangsar) 47. Honourable Datuk Haji Shabudin bin Yahaya (Tasek Gelugor) 48. Honourable Dato' Sri Haji Abdul Rahman bin Mohamad (Lipis) 49. Honourable Dato' Sri Dr. Haji Ismail bin Haji Abd Muttalib (Maran) 50. Honourable Tuan Mohd Shahar bin Abdullah (Paya Besar) 51. Honourable Dato' Hajah Hanifah Hajar Taib (Mukah) 52. Honourable Datuk Seri Haji Ahmad bin Hamzah (Jasin) 53. Honourable Datuk Zahidi bin Zainul Abidin (Padang Besar) 54. Honourable Dato' Henry Sum Agong (Lawas) 55. Honourable Datuk Aaron Ago Dagang (Kanowit) 56. Honourable Tuan Haji Hasbi bin Haji Habibollah (Limbang) 57. Honourable Tuan Arthur Joseph Kurup (Pensiangan) 58. Honourable Dato’ Hajah Siti Zailah binti Mohd Yusoff (Rantau Panjang) 59. Honourable Tuan Ahmad Marzuk bin Shaary (Pengkalan Chepa) 60. Honourable Dato' Haji Che Abdullah bin Mat Nawi. (Tumpat) 61. Honourable Tuan Haji Awang bin Hashim (Pendang) 62. Honourable Tuan Haji Ahmad Amzad bin Mohamed @ Hashim (Kuala Terengganu) 63. Honourable Dato’ Sri Dr. Wee Jeck Seng (Tanjung Piai) 64. Honourable Datuk Dr. Jeffrey Gapari Kitingan (Keningau) 65. Honourable Tuan Che Alias bin Hamid (Kemaman) 66. Honourable Tuan Shaharizukirnain bin Abd Kadir (Setiu) 67. Honourable Tuan Lukanisman bin Awang Sauni (Sibuti) 68. Honourable Tuan Haji Ahmad Johnie bin Zawawi (Igan) 69. Honourable Dato' Sri Hasan bin Arifin (Rompin) 70. Honourable Dato' Seri Mohamed Nazri bin Abdul Aziz (Padang Rengas) 71. Honourable Tuan Sabri bin Azit (Jerai) 72. Honourable Tuan Ahmad Tarmizi bin Sulaiman (Sik) 73. Honourable Tuan Haji Yamani Hafez bin Musa (Sipitang) 74. Honourable Tuan Yusuf bin Abd Wahab (Tanjong Manis) 75. Honourable Puan Rubiah binti Wang (Kota Samarahan) 76. Honourable Dato' Syed Abu Hussin bin Hafiz Syed Abdul Fasal (Bukit Gantang) 77. Honourable Datuk Mohamad bin Alamin (Kimanis) 78. Honourable Tuan Ramli Bin Dato’ Mohd Nor (Cameron Highlands) 79. Honourable Tuan Jugah Ak Muyang @ Tambat (Lubok Antu) 80. Honourable Tuan Anyi Ngau (Baram) 81. Honourable Dato' Seri Dr. Ahmad Zahid bin Hamidi (Bagan Datuk) 82. Honourable Dato’ Seri Ahmad Faizal bin Azumu (Tambun) 83. Honourable Dato' Seri Haji Abdul Hadi Awang (Marang) 84. Honourable Dato' Seri Dr. Shahidan bin Kassim (Arau) 85. Honourable Dato' Sri (Dr.) Richard Riot anak Jaem (Serian) 86. Honourable Dato' Seri Mahdzir bin Khalid (Padang Terap) 87. Honourable Datuk Seri Tengku Adnan bin Tengku Mansor (Putrajaya) 88. Honourable Tan Sri Noh bin Haji Omar (Tanjong Karang) 89. Honourable Tuan Nik Mohamad Abduh bin Nik Abdul Aziz (Bachok) 90. Honourable Dr. Nik Muhammad Zawawi bin Haji Salleh (Pasir Puteh) 91. Honourable Dato' Seri Tiong King Sing (Bintulu) 92. Honourable Dato' Sri Bung Moktar bin Radin (Kinabatangan) 93. Honourable Dato' Seri Haji Idris bin Jusoh (Besut) 94. Honourable Datuk Seri Haji Ahmad bin Haji Maslan (Pontian) 95. Honourable Dato' Sri Hajah Rohani binti Abdul Karim (Batang Lupar) 96. Honourable Datuk Ahmad Jazlan bin Yaakub (Machang) 97. Honourable Datuk Seri Panglima Abdul Azeez bin Abdul Rahim (Baling) 98. Honourable Tuan Ahmad Fadhli bin Shaari (Pasir Mas) 99. Honourable Tuan Haji Wan Hassan bin Mohd Ramli (Dungun) 100. Honourable Tuan Abdul Latiff bin Abdul Rahman (Kuala Krai) 101. Honourable Dato' Hajah Azizah binti Mohd Dun (Beaufort) 102. Honourable Datuk Wilson Ugak Anak Kumbong (Hulu Rajang) 103. Honourable Dato' Haji Mohd Fasiah bin Mohd Fakeh (Sabak Bernam) 104. Honourable Dato' Haji Jalaluddin bin Alias (Jelebu) 105. Honourable Dato' Haji Salim bin Sharif @ Mohd Sharif (Jempol) 106. Honourable Dato' Mohd Nizar bin Haji Zakaria (Parit) 107. Honourable Datuk Zakaria bin Mohd Edris (Libaran) 108. Honourable Dato' Haji Ahmad Nazlan bin Idris (Jerantut) 109. Honourable Datuk Robert Lawson Chuat (Betong)

Bill — Supply Bill 2021 and Development Estimates Motion 2021 Committee — Members Who Disagree:Bill

1. Honourable Tuan Kesavan a/l Subramaniam (Sungai Siput) 2. Honourable Tuan Sanisvara Nethaji Rayer a/l Rajaji (Jelutong) 3. Honourable Puan Wong Shu Qi (Kluang) 4. Honourable Dr. Kelvin Yii Lee Wuen (Bandar Kuching) 5. Honourable Tuan Steven Choong Shiau Yoon (Tebrau) 6. Honourable Puan Vivian Wong Shir Yee (Sandakan) 7. Honourable Puan Hajah Natrah Binti Ismail (Sekijang) 8. Honourable Puan Rusnah Binti Aluai (Tangga Batu) 9. Honourable Tuan Cha Kee Chin (Rasah) 10. Honourable Tuan Teh Kok Lim (Taiping) 11. Honourable Puan Noorita Binti Sual (Tenom) 12. Honourable Tuan Baru Bian (Selangau) 13. Honourable Dr. Maszlee bin Malik (Simpang Renggam) 14. Honourable Tuan Syed Saddiq bin Syed Abdul Rahman (Muar) 15. Honourable Dato' Wira Haji Amiruddin bin Haji Hamzah (Kubang Pasu) 16. Honourable Datuk Dr. Shahruddin Bin Md. Salleh (Sri Gading) 17. Honourable Tuan Su Keong Siong (Kampar) 18. Honourable Dr. Azman bin Ismail (Kuala Kedah) 19. Honourable Tuan Sim Chee Keong (Bukit Mertajam) 20. Honourable Tuan Chan Ming Kai (Alor Setar) 21. Honourable Datuk Haji Hasanuddin bin Mohd Yunus (Hulu Langat) 22. Honourable Tuan Syed Ibrahim bin Syed Noh (Ledang) 23. Honourable Puan Kasthuriraani a/p Patto (Batu Kawan) 24. Honourable Tuan Nik Nazmi bin Nik Ahmad (Setiawangsa) 25. Honourable Tuan Wong Kah Woh (Ipoh Timur) 26. Honourable Tuan Larry Soon @ Larry Sng Wei Shien (Julau) 27. Honourable Datuk Wira Dr. Mohd Hatta bin Md Ramli (Lumut) 28. Honourable Tuan Khoo Poay Tiong (Kota Melaka) 29. Honourable Tuan Charles Anthony Santiago (Klang) 30. Honourable Tuan Sim Tze Tzin (Bayan Baru) 31. Honourable Puan Hannah Yeoh Tseow Suan (Segambut) 32. Honourable Datuk Seri Dr. Haji Dzulkefly bin Ahmad (Kuala Selangor) 33. Honourable Tuan Muhammad Bakhtiar bin Wan Chik (Balik Pulau) 34. Honourable Tuan Chan Foong Hin (Kota Kinabalu) 35. Honourable Puan June Leow Hsiad Hui (Hulu Selangor) 36. Honourable Tuan Wong Hon Wai (Bukit Bendera) 37. Honourable Tuan Hassan bin Abdul Karim (Pasir Gudang) 38. Honourable Tuan Oscar Ling Chai Yew (Sibu) 39. Honourable Tuan Noor Amin bin Ahmad (Kangar) 40. Honourable Datuk Dr. Hasan bin Bahrom (Tampin) 41. Honourable Tuan Wong Tack (Bentong) 42. Honourable Puan Maria Chin binti Abdullah (Petaling Jaya) 43. Honourable Tuan Awang Husaini bin Sahari (Putatan) 44. Honourable Tuan Mordi anak Bimol (Mas Gading) 45. Honourable Tuan Prabakaran a/l M. Parameswaran (Batu) 46. Honourable Tuan Pang Hok Liong (Labis) 47. Honourable Datuk Wira Haji Mohd Anuar Mohd Tahir (Temerloh) 48. Honourable Tuan Wong Ling Biu (Sarikei) 49. Honourable Tuan Karupaiya a/l Mutusami (Padang Serai) 50. Honourable Tuan Tan Kok Wai (Cheras) 51. Honourable Dato' Seri Dr. Wan Azizah binti Wan Ismail (Pandan) 52. Honourable Puan Nurul Izzah binti Anwar (Permatang Pauh) 53. Honourable Tuan Chow Kon Yeow (Tanjong) 54. Honourable Tuan M. Kulasegaran (Ipoh Barat) 55. Honourable Datin Paduka Dr. Tan Yee Kew (Wangsa Maju) 56. Honourable Puan Teresa Kok Suh Sim (Seputeh) 57. Honourable Dr. Lee Boon Chye (Gopeng) 58. Honourable Datuk Seri Dr. Mujahid bin Yusof Rawa (Parit Buntar) 59. Honourable Tuan William Leong Jee Keen (Selayang) 60. Honourable Tuan Loke Siew Fook (Seremban) 61. Honourable Dato' Haji Mahfuz bin Haji Omar (Pokok Sena) 62. Honourable Puan Alice Lau Kiong Yieng (Lanang) 63. Honourable Dato' Abdullah Sani bin Abdul Hamid (Kapar) 64. Honourable Tuan Ong Kian Ming (Bangi) 65. Honourable Tuan Wong Chen (Subang) 66. Honourable Puan Yeo Bee Yin (Bakri) 67. Honourable Puan Nor Azrina binti Surip (Merbok) 68. Honourable Tuan Lim Lip Eng (Kepong) 69. Honourable Dato' Seri Anwar bin Ibrahim (Port Dickson) 70. Honourable Tuan Haji Mohamad bin Sabu (Kota Raja) 71. Honourable Tuan Lim Guan Eng (Bagan) 72. Honourable Tuan Lim Kit Siang (Iskandar Puteri) 73. Honourable Datuk Seri Saifuddin Nasution bin Ismail (Kulim Bandar Baharu) 74. Honourable Datuk Seri Haji Salahuddin bin Ayub (Pulai) 75. Honourable Tuan Gobind Singh Deo (Puchong) 76. Honourable Dato’ Dr. Xavier Jayakumar a/l Arulanandam (Kuala Langat) 77. Honourable Tuan Fong Kui Lun (Bukit Bintang) 78. Honourable Dato' Johari bin Abdul (Sungai Petani) 79. Honourable Tuan Chang Lih Kang (Tanjong Malim) 80. Honourable Tuan Nga Kor Ming (Teluk Intan) 81. Honourable Tuan Chong Chieng Jen (Stampin) 82. Honourable Tuan Akmal Nasrullah bin Mohd Nasir (Johor Bahru) 83. Honourable Puan Fuziah binti Salleh (Kuantan) 84. Honourable Tuan Khalid bin Abd. Samad (Shah Alam) 85. Honourable Tuan Tony Pua Kiam Wee (Damansara) 86. Honourable Dr. Michael Teo Yu Keng (Miri) 87. Honourable Tengku Zulpuri Shah bin Raja Puji (Raub) 88. Honourable Puan Teo Nie Ching (Kulai) 89. Honourable Datuk Seri Shamsul Iskandar @Yusre bin Mohd Akin (Hang Tuah Jaya) 90. Honourable Dato' Ngeh Koo Ham (Beruas) 91. Honourable Tuan Ahmad Fahmi bin Mohamed Fadzil (Lembah Pantai) 92. Honourable Tuan Mohamed Hanipa bin Maidin (Sepang) 93. Honourable Datuk Seri Panglima Wilfred Madius Tangau (Tuaran) 94. Honourable Tuan Sivakumar a/l Varatharaju Naidu (Batu Gajah)

Bill — Supply Bill 2021 and Development Estimates Motion 2021 Committee — Members Absent:Bill

1. Honourable Dato' Sri Mohd Najib bin Tun Haji Abdul Razak (Pekan) 2. Honourable Tengku Razaleigh Hamzah (Gua Musang) 3. Honourable Dato' Sri Haji Tajuddin bin Abdul Rahman (Pasir Salak) 4. Honourable Tuan Haji Ahmad bin Hassan (Papar) 5. Honourable Datuk Rozman bin Isli (Labuan) 6. Honourable Dato' Masir Kujat (Sri Aman) 7. Honourable Tun Dr. Mahathir bin Mohamad (Langkawi) 8. Honourable Dato' Seri Utama Haji Mukhriz Tun Dr. Mahathir (Jerlun) 9. Honourable Tuan Ramkarpal Singh a/l Karpal Singh (Bukit Gelugor) 10. Honourable Datuk Christina Liew Chin Jin (Tawau) 11. Honourable Datuk Mohamaddin bin Ketapi (Lahad Datu) 12. Honourable Puan Isnaraissah Munirah binti Majilis @ Farkharudy (Kota Belud) 13. Honourable Tuan Ma'mun bin Sulaiman (Kalabakan) 14. Honourable Datuk Ignatius Darell Leiking (Penampang) 15. Honourable Tuan R. Sivarasa (Sungai Buloh) 16. Honourable Datuk Seri Panglima Haji Mohd Shafie bin Haji Apdal (Semporna) 17. Honourable Datuk Mohd Azis bin Jamman (Sepanggar) [Question agreed to] [Head B.28 ordered to form part of the Schedule]

Mr ChairmanEN

Honourable Members, the next question is that the expenditure under Head P.28 Development Expenditure Estimates 2021 be approved. [Question put for decision, and agreed to] [Head P.28 forms part of the Estimates]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Dato' Takiyuddin bin HassanPAS · PNMinister in the Prime Minister's Department (Parliament and Law) · Kota BharuEN

' Honourable Mr Speaker; "Notwithstanding the earlier Motion under Standing Order 12(1), namely on Thursday, 5 November 2020, and in accordance with Standing Order 12(1), Mr Speaker, I move that today's Sitting shall not be adjourned until the Committee stage of the Ministry of Science, Technology and Innovation debate on the Supply Bill 2021 and the Development Estimates Motion has been completed and decided, and after that the House shall adjourn until 10.00 a.m. on Tuesday, 8 December 2020". Thank you.

Puan Hajah Zuraida binti KamaruddinPKR · PHMinister of Housing and Local Government · AmpangEN

Mr Speaker, I beg to second.

Mr SpeakerEN

Thank you. Honourable Members, I now put the question to the House for decision. The question is that the motion as moved be agreed to.

[Motion put for decision; and agreed to]

–

Kepala P.30Anggaran Pembangunan 2021

–

Mr ChairmanEN

Honourable Members, Supply Head B.30 and Development Head P.30 under the Ministry of Science, Technology and Innovation are now open for debate. We begin with the Honourable Member for Selayang. Please proceed.

Tuan William Leong Jee KeenPKR · PHSelayangEN

Thank you, Mr Chairman. I begin with Item 00800 - Research and Development Programme R&D, Item 83000 - Malaysian Industry-Government Group for High Technology (MIGHT) and Item 09000 - Various Equity Injections. The first matter I wish to raise is the implementation of the Science, Technology and Innovation Policy, which is not holistic. I agree with the statement made by the Honourable Minister at the Malaysian Digitalization Forum on 6 October that among the biggest problems is that the implementation of science, technology and innovation in Malaysia is not holistic, and this needs to be improved. In 2018, there were 81 national policies, of which 56 concerned science, technology and innovation, with 458 agencies involved. As has been said, there will be no silos, and this has become a big problem, because we want one ministry and one agency that can monitor and be involved holistically so that we do not have policies that are implemented in an overlapping or conflicting manner. The second matter is that if we look at the National Survey of Research and Development Malaysia 2019, we indeed have many challenges to face. If we look at GERD, or Gross Expenditure on R&D, in 2018 it was RM15 billion. This is a shortfall of RM2.6 billion compared with 2016, when the total was RM17 billion. BERD, or Business Expenditure R&D, also shows a shortfall compared with RM10 billion in 2016. If we look at the NSTIP target, that GERD should be two per cent of GDP, we are far from our objective, and we want to take measures quickly because this is a dynamic situation if we want to increase our competitiveness. If we look at GERD, the expenditure of countries in Asia.

Tuan William Leong Jee KeenPKR · PHSelayangEN

The GERD for China is 2.1 per cent, Japan 32 per cent, Taiwan 33 per cent and South Korea 46 per cent. If we also compare with Singapore, with patents registered at the European Patent Office (EPO) for 2018, Malaysia registered 33 patents and Singapore 44 patents. For the USPTO, Malaysia registered 239 and Singapore 1,071. When we compare Singapore with us, we are far behind. Among the problems of R&D in Malaysia, large companies outsource their R&D to companies in other countries. Second, R&D is usually done by the parent company or holding company, and many holding companies have also moved to other countries. So, this is a big challenge, and I hope the ministry can take steps to encourage more R&D, so that our companies carry out R&D here. The third and final point concerns startups with large injections of funds. Attention needs to be given to startups from the beginning, not just at the commercialisation stage. This requires a change of mindset, that a project failing to achieve success is not a failure. It is a process to achieve it, and banks, venture capital and NGO financing lenders should also encourage this change of mindset. If we do not start with the mindset for startups that there is money that we say is to be burnt, this is an important process if we want to develop technology, science and innovation to enhance our competitiveness. Thank you.

Mr ChairmanEN

Thank you, the Honourable Member. Please, the Honourable Dungun.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman, for allowing me to debate at the Committee stage of the Ministry of Science, Technology and Innovation (MOSTI). Item 020200 – STI Culturalisation. I welcome the allocation provided under the STI Culturalisation Programme of RM5.03 million to produce human capital that is not only knowledgeable but also highly skilled, in line with the needs of the country by 2050. As is well known, the STI Culturalisation Programme is a very important programme to attract interest and foster public awareness of the culturalisation of Science, Technology, Innovation and Economics (STIE) in all aspects of daily life. The STI Culturalisation Programme, organised with the cooperation of various parties, whether government agencies, state governments, non-governmental organisations (NGOs), institutions of higher learning or schools, should be further strengthened. Therefore, to what extent is the culturalisation of innovation and creativity involving all levels of society being enhanced through the implementation of programmes and activities guided by Science, Technology and Innovation (STI), and will new programmes or activities be established? In this item, I also want to know whether programmes such as the National Science Week, the MOSTI Open Day and the STIE Carnival will be continued next year or carried out in the new normal following the COVID-19 pandemic. Items 020300 and 020400 – National Planetarium and also the National Science Centre (PSN). Thank you for the allocation to the National Planetarium of RM6.2 million, which plays a very important role in raising public awareness of the importance of the field of space science. Besides taking the first step in bringing Malaysia into the field of astronomy and space science. Therefore I want the government to explain, where will this allocation be channelled? What programmes or initiatives will be implemented to strengthen the world of science and space outer space, besides increasing the culturalisation of science, technology and innovation among students? Furthermore, what steps will the ministry take in future to attract schools, especially in interior or rural areas, to visit the National Planetarium and the National Science Centre? Informal learning in the world of science and technology will, to some extent, encourage the participation and interest of those students. I also want to touch on the issue of the subjects of Science, Technology, Engineering and Mathematics (STEM) among our students, which has still not reached the target. As everyone knows, this matter needs to be given serious emphasis, requiring the preparedness of all parties in facing global developments and the Industrial Revolution 4.0. Therefore, what efforts and strategies are being implemented by the ministry not only to culturalise but also to encourage more students, especially rural students, to enter the STEM field? Because of the efforts to achieve the aims and activities implemented to produce national scientists, there must certainly be a need for earnest efforts to ensure that existing STEM graduates can move towards making the field of astronomy and space science a success and produce many scientists among them in our country. Next, relating to the interest of Bumiputera students in science and pure science is very low. Many students from Peninsular Malaysia, Sabah and Sarawak do not register in science and pure science fields, although this learning aspect is important to produce national scientists. So I want to get an explanation. What efforts are there to attract Bumiputera students, from Peninsular Malaysia, Sabah and Sarawak, to join in the effort to produce national scientists through science and pure science? Thank you, Mr Chairman.

Puan Yeo Bee YinDAP · PHBakriEN

Thank you, Mr Chairman. Mr Chairman, first of all Bakri wants to refer to Item 09000 – Miscellaneous Equity Injections. I have observed that for 2020 the revised estimate is RM14.1 million. In fact, what was allocated for 2020 under the Miscellaneous Equity Injections item previously was RM68 million for 2020. Bakri wants to know, to get an explanation of what changes have occurred and the expenditure so far by agency under the same item for 2020. For 2021, I ask the ministry to provide a breakdown of this RM85 million allocation by agencies under MOSTI, such as Cradle, Kumpulan Modal Perdana, MAVCAP, MTDC, MDEC and others. What is the ministry's strategy to optimise financing? Previously, the Cabinet meeting on 21 August 2019 approved that the financing activities for technology commercialisation would be managed by only three agencies. Specifically for financing through grants, equity and loans. Financing through grants will be managed only by Cradle Fund, equity financing will be carried out by MAVCAP through a fund of funds structure, and the direct granting of loans will be implemented by MDV.

Puan Yeo Bee YinDAP · PHBakriEN

Will this policy be continued? I see now that MIGHT, MDEC and MAGIC have also been moved under MOSTI. What steps has the ministry taken to avoid overlapping functions between agencies and to improve efficiency so that the startup technology ecosystem can be strengthened from time to time? Mr Chairman, under the same item Bakri also wants to raise again the issue of cabotage, but from the aspect of startup technology and also the high-tech industry. As we know, the Ministry of Transport withdrew the cabotage exemption for foreign-registered vessels carrying out maintenance of undersea cables. Under this cabotage policy, it is reported that cable maintenance will take up to 27 days. This is very worrying. How can digital and communication-based startup companies grow and develop if the quality of the internet cannot even be guaranteed? There are also reports that Tech Giants are reviewing their investments in Malaysia. The uncertainty and instability of the Tech Giants in Malaysia will have a very negative impact on the overall digital industry development ecosystem, and startup companies will also be affected. Besides that, Bakri is also concerned that this cabotage issue will affect the implementation of the fund of funds model for equity injections. The fund of funds model aims to attract experienced private venture capital companies that have large supply chain and market networks to jointly invest and manage government equity investments in order to improve ROI. The cabotage issue clearly is not friendly to high technology companies. This will send a very negative signal not only to technology startups but also to private venture capital companies that we want to attract to participate in the fund of funds initiated by the Government of Malaysia. Bakri wants to know, what is the view and stance of the ministry, whether MOSTI also agrees on this cabotage issue? This is because it will have very negative implications, and I know that if all the issues I have raised are not answered shortly, I hope the Honourable Minister can answer this issue. This is because earlier the Honourable Minister of Transport was afraid to answer this cabotage issue. Next, Mr Chairman, I would also like to refer to Item 010100 – General Administration. Bakri wants to know what improvements the ministry will make for 2021 to increase the efficiency and performance of the ministry. Will the ministry still use the Intelligent Analysis Evaluation and Real-time Solutions system or i-ALERT, which was launched in February 2020? It is an online system to manage, monitor and measure the performance of the ministry's initiatives, and can be accessed via mobile phone by the ministry's officers to improve the efficiency of monitoring the implementation of initiatives. This was in fact an initiative of Datuk KSU. Bakri wants to know the effectiveness of this system after nine months of use by the ministry and what improvements will be made for 2021. Bakri also wants to refer to Item 020400 – National Science Centre. It seems there is a reduction in allocation of RM5 million and I want to know what the government's explanation is for where this reduction is. Next, Item 020500 – Academy of Sciences Malaysia. Bakri wants to know what the developments in the implementation of i-Connect and also the Malaysia Open Science Platform (MOSP), which was launched by MSN on 7 November 2019, are. What are the plans for 2021? Finally, Bakri also wants to refer to Item 030600 – Malaysian Space Agency. I want to know what the developments and progress of remote sensing satellites are. Will the Cabinet memorandum of 14 August 2019 that was approved by the Pakatan Harapan Government be continued, in which the development of remote sensing satellites will be implemented through the concept of a constellation of satellites. What is the target date for implementing this initiative if this initiative or project will be continued. That is all I want to raise. Thank you.

Mr ChairmanEN

Thank you, the Honourable Member. The Honourable Sibuti.

Thank you, Mr Chairman. Sibuti will go on to Item 020000 – STI Planning and Culturalisation. Item 020200 – STI Culturalisation. Here I would like to raise several issues regarding what is happening in the state of Sarawak concerning STI culturalisation. Next year, the Sarawak State Government, through the Ministry of Science and Technology in Sarawak, will provide Raspberry Pi, which is a gadget or micro-computer, to students and children in schools. A total of 10,000 Raspberry Pi will be provided. However, I look at this matter from the perspective of what steps forward the ministry will take to help the state of Sarawak in providing professional services or creating educators to help support the distribution of these Raspberry Pi in Sarawak. This is because these Raspberry Pi can be used to create various small projects and will also inspire children in this STI field. Besides that, most science programmes in Malaysia are too focused on urban-centred programmes. I hope that for 2021 the allocation provided will be distributed to states or areas in rural regions so that we can popularise science, technology and innovation to all our children in Malaysia. Besides that, I would also like to ask the minister about Item 010100 – General Administration. Not all state governments have a ministry or Exco for Science and Technology. Does the government intend to form a committee or council or encourage all states in Malaysia to establish an Exco and also a Ministry of Science and Technology to accelerate, with permission, the development of science and technology at the state level. Besides that, there is one issue that I have often raised before, regarding the item on technology development and STI services, namely Item 030300 – Chemistry Malaysia or the Chemistry Department of Malaysia. The issue of there being no identity cards in Sabah and also Sarawak still persists. In Sarawak there are issues where children still do not have identity cards and these children have been abandoned by their parents. Therefore, a solution, with permission, has been proposed by the JPN for them to undergo DNA tests. However, such tests are very expensive. I also hope the government can consider and offer a package to facilitate these DNA tests. However, when these DNA test results have been issued, the JPN does not adopt those results even though the results were issued by the Chemistry Department of Malaysia itself. Therefore, this is quite troublesome, especially for rural residents who come to the towns. For example, in the case of Sibuti, they have to go to the nearest laboratory in Bintulu, which also incurs costs, but the result obtained is that they fail to prove, even though the tests come from the parents or the siblings themselves. 100 per cent matching. Besides that, I would like to know about Item 00800 – Research and Development (R&D) Programme. What are the details and what forms of R&D are being focused on for 2021. Also besides that, I would like to look at Item 830000 – Malaysia Industry Government Group of High Technology (MIGHT). This is an agency concerning technology foresight. I would like to ask the ministry what its views are on the development of the hydrogen industry or hydrogen technology being pursued by the Sarawak State Government. Will the government or at the level of the Ministry of Science, Technology and Innovation provide assistance or support for that effort.

Also, finally, concerning Item 006004 – National Science Centre (PSN). Given that the involvement and participation of students in the science stream in Sarawak is rather worrying. What are the ministry's future steps to encourage the participation or involvement of students to again develop an interest in this science stream? That is all, thank you.

Mr ChairmanEN

Thank you. The Honourable Kuala Selangor.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, Mr Chairman. First of all, I would like to record that the minister of the ministry we are discussing is responsible for, among other things, driving the creation of wealth for the country and for the people, generating new knowledge and at the same time driving economic growth, especially in the new growth area, with permission. Certainly, in doing so, the ministry will be centred on increasing productivity and ultimately will see higher incomes for workers. Mr Chairman, I now proceed to Item 040000 – Special Programmes, especially Item 040300 – MIMOS Berhad, with an allocation of RM35 million under the head of grants and fixed charges, 40 thousand, which we can see there. MIMOS as the Institute of Microelectronic Systems. I want to ask the Minister about the decline in the contribution of the electrical and electronic sector to GDP, which was previously in the region of 30 per cent and has fallen to less than 20 per cent, if I am not mistaken. We observe that this is partly due to MIMOS no longer focusing on the heartbeat, the strategic core for driving the semiconductor or microelectronics sector. Instead it has shifted to the area of IT, which has already been driven by MDEC and others. So I want to ask, does this trend also mean that MIMOS is no longer interested in strengthening wafer fabrication technology, which would ultimately produce integrated circuit (IC) chips, microchips and so on, which are the heartbeat of the semiconductor and microelectronics industry.

May I interject, the Honourable Kuala Selangor?

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Please, the Honourable Tuaran. Interested, are you?

Thank you, Mr Chairman. Thank you, the Honourable Kuala Selangor. Are you aware that within MIMOS there are more than a thousand IPs that have been produced by MIMOS over this period? Would the Honourable Member also like to ask the Minister, what steps are being taken to commercialise all the IPs that have been produced over this period? Are those IPs still relevant up to today, because those IPs were made a long time ago? Thank you.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, my friend, the Honourable Member for Tuaran. Include this in my speech as well. It is one very important and relevant matter that the Minister must answer. I will continue, Mr Chairman. On the same matter, I want to stress how important it is for MIMOS to return to strengthen this industry, because the E and E sector was once a major contributor to GDP. But the decline clearly shows that we have ended up only doing OEM work or contract assembly. This is because we have placed too little emphasis on the wafer fabrication technology needed for design, which would allow us to produce products and services with higher value added or added value. At the same time, Mr Chairman, I come to SilTerra Malaysia Sdn Bhd, which is wholly owned by Khazanah. A semiconductor wafer foundry operator, it is now in dispute over whether Khazanah should sell it. When the Honourable Member for Langkawi created this, or promoted this, or initiated this, it was one of the pillars of industrialisation, semiconductor industries and so on. But today it is trapped in losses that have lasted for several years, and today it is about to be sold to several foreign interests, Taiwan, Germany and so on. There are also local enthusiasts. What is important for me to stress is that if this is about the only local champion that is struggling in losses today, will the ministry still sell it? This is among the last remaining technologies we have to drive the semiconductor and electronics industry, Mr Chairman. It would be very unfortunate if we continue to mortgage and sell what was once our pride. I would also like to go a little further, Mr Chairman, on matters that I have not found about this vaccine, which the MOSTI does not have either. The MITI does not have it either, and the MOH does not have it either. Yet we often hear announcements and reports, including announcements about the purchase mentioned by the Honourable Member for Pagoh, the Prime Minister, who said that the purchase of vaccines from Pfizer is 12.8 million doses, and will involve administering the vaccine to 6.4 million people, or 20 per cent of the population. If we compare this with the purchase of the COVAC vaccine, which was supposed to be WHO's recommendation, it was only 10 per cent. But for this private manufacturer, Pfizer, which requires storage similar to the winter in Antarctica, minus 70 or 80 degrees Celsius. So, I want to know. We need more transparency in the procurement and distribution processes. Recently there was an announcement that MYEG was given the sole distributor or exclusive sole agent to distribute the vaccine from China, which, if I am not mistaken, is also from Pfizer, and this has become a crisis, a confusion, a question mark and an issue in managing procurement, managing acquisition, and in connection with this vaccine, which is very uncontrolled. I ask the Minister of MOSTI to explain all of this, which is a question mark that continues to trouble the people. RM2 billion was spent on Pfizer and another RM1 billion will be used for its storage, minus 70 or 80 degrees Celsius. In other words, RM3 billion allocated has already been consumed, and I do not know where it is in this 2021 Budget Expenditure Estimates. Mr Chairman, there are many other matters I wish to mention, but within the five minutes I can present, that is all. Thank you once again.

Mr ChairmanEN

Thank you, the Honourable Member for Kuala Selangor. The Honourable Member for Jerai is invited.

Tuan Sabri bin AzitPAS · PNJeraiEN

Peace be upon you, and the mercy and blessings of God. Mr Chairman, I will go straight to Item 020200 – Inculcation of STI. The allocation is RM5,031,600. Among its aims is to inculcate science and innovation in urban and rural communities. I congratulate the ministry on its efforts to inculcate STI in society. In this regard, I seek clarification from the Honourable Minister. With such an allocation, will its impact be felt by all levels of society throughout the country through programmes such as Turun Padang and Minggu Sains Negara? Next, Item 020500 – Academy of Sciences Malaysia. RM12 million is allocated. Looking at the functions of this item, its only function is to help increase technology in Malaysia's industrial sector. In connection with this, the housing sector in the country is increasingly rising in price in the market. More and more low-income people are unable to buy houses that are expensive.

Tuan Sabri bin AzitPAS · PNJeraiEN

Therefore, through the Academy of Sciences Malaysia with this function, I propose that technology in the housing sector be developed so that the technology produced can reduce the cost of housing, enabling people to own homes at affordable prices. Lastly, Item 040400 – Malaysia Global Innovation and Creativity Centre (MaGIC), with RM20 million allocated. I would like clarification from the Honourable Minister on whether the innovation and creativity programme includes research into producing drones for farmers. In other words, the Honourable Minister's ministry could collaborate with the Ministry of Agriculture and Food Industries so that padi farmers, mostly in the north of the country, and B40 groups can use locally made drones. With the RM20 million allocation, I believe research on drones can be allocated sufficiently. Likewise with innovation to make it easier for students, with innovative programmes created by MOSTI, to what extent are students able to benefit from the innovations and creativity of the ministry, especially in helping students' teaching and learning processes? That is all, Mr Chairman. Thank you.

Mr ChairmanEN

Thank you, the Honourable Member for Jerai. The Honourable Member for Pasir Gudang, please.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you, Mr Chairman. Pasir Gudang also wishes to debate the Ministry of Science, Technology and Innovation with reference to Item 040000 Programme 040700 – Malaysian Industry-Government Group for High Technology (MIGHT). I would like to ask the Honourable Minister's side: the 2021 estimate of RM10 million, for what project will it be used? I ask this with good intentions, because I view the Ministry of Science, Technology and Innovation as very important for our country's future, to become a high-technology, advanced nation. Next, regarding MIGHT, Item 83000 – Development Purpose 30 Estimate for 2021 is allocated RM40 million. I also ask for clarification on what project the RM40 million allocation is for. Regarding high technology, Mr Chairman, I want to draw the Honourable Minister's attention to the fact that I represent Pasir Gudang, a major industrial centre in the south of the Peninsula, an industrial area that is important to our national economy. However, the industries in Pasir Gudang, which have existed for more than four decades, are mostly not high-technology industries but industries that are not environmentally friendly and are hazardous. Everyone knows that air pollution earlier last year affected thousands of schoolchildren and members of the public. Likewise the pollution of Sungai Kim Kim through the discharge of these toxic substances. So this is why it is time, we do not want these hazardous factories, such as petrochemical industries, for example. Pasir Gudang now has a population of more than half a million people and has been elevated to a city. So perhaps this ministry can assist the government by carrying out studies and efforts so that high-technology industries that are environmentally friendly, that are green, can help ensure that in the future we have a sustainable situation in our industrial areas. In connection with this high-technology industry too, I want to ask the Honourable Minister whether it is related to vaccine production. We assumed our country should have become a developed nation by 2020, but when the COVID-19 pandemic occurred, it seems we still depend on vaccines produced by the United States, Europe, Russia and China. So perhaps this should be considered in the future. The MOSTI may have carried out this effort, I am not sure, namely collaboration and cooperation with our universities, of which there are many in our country. But how long will we remain only consumers of vaccines? So perhaps this ministry should focus on the role of universities so that each university, if the university is named University of Science, truly becomes a University of Science with innovation. If the university is agricultural, even though it has been changed to Universiti Putra, it should carry out agricultural technology innovation producing paddy seeds. Until now this issue is still being debated. So that is it, Mr Chairman, I truly hope the government will give a greater allocation to this ministry in the future. This is a very important ministry. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, the Honourable Member for Pasir Gudang. The Honourable Member for Kimanis, please.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Peace be upon you, and the mercy and blessings of God. Thank you, Mr Chairman. I refer to the head of Item 040500 – National Institute of Biotechnology Malaysia (NIBM), allocated RM30 million. But like my other colleagues, I am looking for specific items that discuss COVID-19, but I am confident that COVID-19 may be discussed under this Item 040500. Mr Chairman, Sabah has recorded more than 20,000 positive cases, the highest in Malaysia, and has stated that it needs urgent allocations to deal with the health crisis happening in the state, and today we are discussing vaccines. Mr Chairman, I hope there is something good for the state of Sabah. We know that in Sabah there are 24 government hospitals and 300 government health clinics throughout Sabah. Yet they still cannot fully meet the needs of the people of Sabah. The official doctor ratio, this is a very important fact, the official doctor-to-population ratio in Sabah is 1:856. One doctor for every 856 residents. Why do I raise this fact, Mr Chairman? I hope that the vaccines that will arrive in our country, this long-awaited arrival, are like the moon falling into one's lap, like waiting for the bride to arrive, because this is what the people and everyone have been longing for. I hope that of the 30 per cent that is said will be provided to the entire population of Malaysia, 10 per cent will be supplied by COVAX and 20 per cent by Pfizer. I would like to ask the Honourable Minister, what percentage and how will the COVID-19 vaccine be distributed to the state of Sabah? We know Sabah is the most affected, among the worst hit by COVID-19. Secondly, regarding this distribution, like the Honourable Member for Kuala Selangor earlier, I also touched on the procurement process. How will it be implemented? We know that perhaps several suppliers or distributors will be appointed. For Sabah, I ask that it also be given a quota for distributors or suppliers from Sabah. Do not let it be monopolised by suppliers and distributors from Peninsular Malaysia. This is so that delivery can be accelerated. Sabah is a very large state, so if there are suppliers within the state of Sabah itself, I am confident they can reach every corner of the state of Sabah. Mr Chairman, I also want to touch on the matter of vaccine brands. I know vaccines are created overseas and there may not yet be a trademark or brand considered suitable for use in this country. However, perhaps the ministry can study whether we can use our own brand, even though this is not our product, we are only marketing someone else's product.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

However, when it reaches the market in our country, how can we ensure that the vaccine distributed in Malaysia is only distributed in Malaysia and may not be suitable for distribution in any other country? So, can negotiations be conducted by the ministry with the parties involved on how we can at least have an identity for the vaccine marketed in Malaysia? So perhaps this should be considered by the MOSTI ministry. Mr Speaker, I also hope that when vaccines are available on the market, 30 per cent for the first round and another 40 per cent, it is said, for the second round. So this will be discussed with pharmaceutical companies and so on, and I ask that this portion be distributed evenly. Do not focus only on Peninsular Malaysia, but Sabah and Sarawak must also be given the opportunity to participate in the vaccine distribution industry. Hopefully this effort can be beneficial and achieve its target, that the vaccines truly reach their intended recipients, especially frontliners today who are exposed to all kinds of risks. So we want not only frontliners but also ordinary citizens to be given vaccines. However, infants― I know earlier there were some facts, infants aged 12 years will not be given the vaccine. But will they be given something at least similar to this COVID-19 vaccine? So that is all, Mr Chairman. Thank you. Peace be upon you, and the mercy and blessings of God.

Mr ChairmanEN

Waalaikumussalam. Thank you. The Honourable Member for Bandar Kuching, please.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

Thank you, Mr Chairman. I will continue to touch on Item 020100, Item 030100, Item 030200 and also the vaccine issue that many of my friends have raised. I actually welcome the news that the government has signed an agreement with the company Pfizer to purchase 12.8 million doses of the COVID-19 vaccine. However, I do hope the government will be transparent about its plans, especially in terms of the logistics distribution mechanism for equity, to ensure that all citizens, regardless of background and demographics, receive the vaccine. Also, awareness campaigns or educational, with permission, to ensure fewer fake news, misinformation, confusion and also doubt or hesitancy, with permission. This Pfizer agreement, as we have already been told many times today, will cover 20 per cent of our population and also COVAX 10 per cent. So this morning I heard the Honourable Minister's answer that the government intends to achieve this 70 per cent. However, I would like to ask, what is the progress of negotiations with other companies? There is a company where there is a last-stage negotiation, and the importance of the time frame in which we target to achieve that herd immunity. I also received news that the company MyEG in Malaysia has signed a contract with a vaccine company in China, Anhui Zhifei Longcom Biopharmaceutical. Since then, the effect has been that MyEG shares have risen by 13.26 per cent, the highest since May 2018. So the issue is that MyEG is not a pharma company or a logistics company. So, on what basis, with permission, did this company obtain that tender? Is track record unimportant, or can any company, in any field, obtain this vaccine tender? For me, this should not have happened. Besides that, Honourable Minister, I would like to ask that― just now the Honourable Minister explained that the company Pfizer will handle the shipment distribution, and that the distribution is due to the expertise in ultra-cold storage required. However, I would like to ask, does this involve direct distribution to the end targeted users, including in rural areas, or only distribution to some central location or urban areas or even towns only? We know that because of the tropical climate in our country and also the demographics, especially in the interior areas of Sabah, Sarawak and also Peninsular Malaysia, it will make distribution of this vaccine difficult. Do we have sufficient ultra-freezing facilities in those areas? I know that in our market we have ultra-freezers such as the TSX Series Ultra-Low Freezer, and perhaps the government plans to rent them. However, I would like to ask, will that cost be borne by the company Pfizer or by our government? Actually, this model also has its weaknesses. Do we have enough for distribution throughout the country? First, the freezer does not have a trigger alarm monitoring service. Second, how will the freezer function in interior areas where the electricity supply is unstable and intermittent? Some have to rely on generators. Can the freezer be connected to a generator? How can we monitor the temperature at every step, every steps of the cold storage? How about when we send the vaccine to village areas? Ride a Hilux, or a boat, or a timber trail? How can we monitor the temperature at every step of the cold storage? If we really want to rent this freezer, how many will be rented? How many for Sarawak, and how many for the whole country? We know that although the understanding is that the first batch will be given to front liners and perhaps the high-risk generation, we must remember there are also many front liners in the interior areas. We do not want the vaccine to be lysed and then not effective in this user, because we have analysts who expect that almost five to 20 per cent of this Pfizer vaccine, with permission, could be rendered ineffective due to inadequate storage conditions. We also know that this vaccine is a two-dose regimen, where the first injection is followed, after three weeks, by the second injection. How does the government plan to help them, especially elderly people living in interior areas, to come back to receive the second injection? If it is stored in interior areas, how is it being kept in this interior area? The vaccine. We do not want them to receive the first dose and not return for the second dose, after which the required antibody titre will not have been induced. So, another very important issue. I hope the government will start right now, actually starting communication and awareness campaigns on the importance of this vaccine to avoid confusion, misinformation and hesitancy. We have to counter pseudoscience or anti-vaccine arguments, which may increase, because doubt or hesitancy will affect the effectiveness of the vaccine distribution. Mr Chairman, this is the last issue. The US and UK have clearly stated that this is the most difficult vaccination campaign in their history, because of the importance of this vaccine and the expertise required. With permission, clocks start well before you receive the product. Therefore, I hope the government will discuss this matter clearly and in detail. The national vaccine roadmap that is drawn up should receive feedback from all relevant stakeholders, including health bodies, both public and private, and even Members of Parliament from both sides, so that there is a whole society approach, a joint collaboration to ensure this vaccine is distributed to those who need it. That is all. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, the Honourable Member for Bandar Kuching. Lastly, the Honourable Member for Arau. Please proceed.

Thank you, Mr Chairman. I want to discuss only one topic in a short time, namely under Item 00800 – Research and Development Programme. We know that in 2020 RM20 million was allocated, and next year the government has increased it to RM98 million. We welcome the government's efforts to provide the COVID-19 vaccine free of charge to the people when it is obtained later. 1 The question that arises here is that we hear this vaccine has gone through the proper laboratory process and has been tested, but we also hear information that in the first stage of the trial, 80 per cent succeeded. This means that if there are 10 people, eight succeeded and two did not succeed, more or less like that. So now it has certainly gone through a process until perhaps 100 per cent success. However, I would like to ask, is it possible that when it is introduced in Malaysia, we conduct another test for Malaysians? Perhaps Malaysians are not the same, there are all kinds. We are not the same, yes. Like we have things in which we are different from other people. So perhaps there is a connection between human nature and the medicine to be tested. Will we conduct a second test when it comes here? Or do we accept directly what we will receive later? I support my friends that we can rebrand this, perhaps there is a problem, but if it can be done, all the better. Only, we are afraid that later there will be― it is certain to happen that people will sell fake medicines and so on. So, what are the government's steps to face this matter? Because, many good things that the government does must have efforts made by certain parties to take advantage, such as fake medicines.

Let us take EPF as an example. EPF has already been given more than what we asked for. For example, we asked for 4.2 million contributors. However, the government gave more than eight million, indeed the government gave to everyone. However, because of the fake news or false reports that were issued, it is difficult to withdraw from EPF and so on. This is what I want to announce, that if Malaysians find it difficult to withdraw their contributions, if they really find it difficult, I will offer my office, PN BBC, to provide services to those who find it hard to obtain the service of withdrawing money from EPF. Likewise for this medicine, but we cannot become a person or body to do something beyond what the government has determined. Make sure there is no one who tries to make fake medicine and afterwards sells it on the black market at a certain price until it causes problems. The government must really control this matter down to its roots so that no one takes advantage when this medicine, this vaccine, is introduced, sorry. The main point that I want to debate here is that there is an anti-vaccine group, also known as anti-vax groups, among which exists, which is very worrying. In the latest study by a global research company based in the UK, UGARF, as many as 82 per cent of Malaysians are ready to be vaccinated, compared with only 18 per cent who refuse this vaccine. The challenge of dealing with anti-vaccine groups is not an easy matter, and it is also faced by other countries in the world. For example, France also faces problems in convincing anti-vaccine groups to take the COVID-19 vaccine, because based on a survey conducted by the newspaper Le Journal du Dimanche last weekend, only 40 per cent of the country's people plan to obtain the vaccine. In America, meanwhile, they...

Tuan Sabri bin AzitPAS · PNJeraiEN

Great, the Honourable Member for Arau.

[Speaking without using the loudspeaker]

Yes? Oh! Thank you, thank you. My French is indeed not correct. But I said it because nobody corrected me, so it became so, right? Le Journal du Dimanche, I don't know, I hope it is correct. In the US, meanwhile, 58 per cent of the population has recorded that they refuse and doubt the effectiveness of this vaccine. So, what has the government done so that this anti-vaccine group does not emerge in this country? Because we know that with this vaccine, our aim is to create herd immunity, that is, when people who are vaccinated succeed in becoming a shield for people who are not vaccinated. Usually people say this topic need not be mentioned, but this is already a movement, because we are easily influenced by thinking on social media and so on. When we see that there are Americans, as many as 51 per cent, who do not want to be vaccinated, and in France only 48 per cent want to be vaccinated. So in Malaysia 18 per cent have already stated that they do not want to be vaccinated. What is the effect on society if there is such thinking? Even though other Malaysians say, "Leave them alone, they do not want the vaccine, it is their own business". But we must remember, it has an effect, between people who do not want vaccines and people who want to be vaccinated. So this ministry has been given sufficient allocation, and certainly its young Minister is able to mobilise this ministry at an extraordinary level, which can place us as a country on the world stage in the field of science and technology. Thank you. I fully support it, and I thank my friends from the other side who supported it so strongly. This government will continue to be supported even though there is a small problem in Perak, but what is important is that at the Federal level this government remains a strong and stable government. It cannot be challenged any more. Finally, one more thing, Honourable Minister, I ask that...

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Time is up, the Honourable Member for Arau.

...a study be made of the effects of this COVID-19. In terms of human thinking, how does it affect humans in terms of thinking, life pressure and so on? Thank you very much.

Mr Chairman (Dato' Mohd Rashid Hasnon)EN

Thank you, the Honourable Member for Arau. Now, Honourable Members, I would like to invite the Honourable Minister to respond, for 15 minutes.

Tuan Khairy Jamaluddin Abu BakarUMNO · BNMinister of Science, Technology and Innovation · RembauEN

Thank you, Honourable Chairman. I record my thanks to all the Honourable Members who have also participated in the debate at the Committee stage for the Ministry of Science, Technology and Innovation (MOSTI). I will try to answer all of them, and if I cannot answer all, I request to answer in writing. I first go to the Honourable Member for Selayang. We have taken note regarding the decline in gross expenditure on R&D and also business expenditure on R&D. Therefore, under our new policy we are targeting an increase in gross expenditure on R&D from a total of 1.04 per cent to a total of 3.5 per cent. Business expenditure on R&D is increased from a total of 43.9 per cent to 70 per cent by 2030, with various initiatives and also incentives given to increase that expenditure. Meanwhile, experimental development research is increased from 24.5 per cent to 50 per cent by 2025. This will certainly further increase the rate of commercialisation of Malaysia's technology. Regarding the policy that does not exist, too many silos and not being seen holistically, that is why we have now restructured the agencies under MOSTI, including technology financing agencies, which is the matter raised by the Honourable Member for Bakri earlier, and also agencies related to technology commercialisation. We must ensure that the agencies under MOSTI do not overlap in terms of technology commercialisation. Therefore, at present I am looking at efforts to ensure that these agencies can be realigned so that we can have one technology commercialisation agency that is not siloed, that does not overlap, a fit-for-purpose technology commercialisation agency, with permission. To manage the challenge and focus on R&D for critical areas that have been identified in our national development plan. I also wish to inform the Honourable Member for Selayang that, of course, under start-up companies, we do not only encourage them to have a mentality that cannot fail, because failure is a common matter, especially at the early stage. Therefore, for financing these technology companies we have two approaches. One approach is on a commercial basis, and this is financing done by agency companies such as MAVCAP. Where, as the Honourable Member for Bakri had earlier started, we focus on equity investment through a fund-of-funds model. However, this is not the only way we invest. We invest also not just for commercial purposes, with permission, but also for strategic purposes. Therefore there is an agency such as MTDC, which perhaps does not take the fund-of-funds approach but takes a direct equity approach, to ensure that these early companies, although we want them to succeed, failure is not regarded as something that stops them from trying again. I now go to the Honourable Member for Bakri, who needs details on the reduction of the PSN allocation. Beginning in 2021, PSN is given its own item, compared with previous years when the PSN allocation was channelled and combined with the Planetarium Negara. The PSN allocation for 2021 has increased for both development and operating allocations. The development allocation of PSN has increased by 7.5 per cent, from a total of RM6 million to a total of RM13.5 million. Regarding MOSP, we have trained a total of 50 data scientists and data curators, and the target is to train another 150 data scientists and data curators. The MOSP programme will continue, and now the data sharing guidelines are being finalised and will begin to be used in the first quarter of 2021. MOSP, this platform is expected to be completed in May 2021, and the platform is expected to be fully completed in October 2021. This platform is being developed in collaboration with the agency MIMOS. Regarding i-Alert, it has been replaced by a Power BI system with the same module but improved with a dashboard using big data analytics.

Tuan Khairy Jamaluddin Abu BakarUMNO · BNMinister of Science, Technology and Innovation · RembauEN

Regarding I-Connect, we have appointed four neutral entities to act as custodians of four economic platforms, namely halal for the Halal Development Corporation for Industry 4.0, Nano Malaysia for Fintech in Islamic Finance (INCEIF) under Bank Negara Malaysia, and another one for health and wellness. We will begin establishing foundation industry members for each platform and will begin opening broadcast research in the first quarter of 2021. It is expected that in 2021, four to five projects will be started. The Honourable Member for Bakri also raised the matter of MYSA – the Satellite Remote Sensing Programme, and the programme proposed earlier will be continued. We propose that this year an open RFP will be issued for us to receive proposals from the private industry, and these proposals are for a Malaysian Remote Sensing Satellite to be developed that will join an international constellation. Regarding the cabotage issue raised by the Honourable Member for Bakri. I too have raised the matters that the Honourable Member for Bakri has raised in the Cabinet Meeting, which were noted by the Ministry of Transport, and a procedure is being drafted which can – firstly, give opportunities to the local industry. But at the same time, it will not jeopardise the time needed to carry out the improvement work on the submarine cables.

Puan Yeo Bee YinDAP · PHBakri

Tuan Pengerusi...

I still have a lot more, the Honourable Member for Bakri. Just a little.

Puan Yeo Bee YinDAP · PHBakriEN

However, the challenge facing us now, Honourable Minister, is the confidence of big tech - this giant tech already - they don't have confidence because this issue was not discussed with them and we made this decision. I want one - whether the Minister can discuss again with the Minister of Transport to change or amend this cabotage issue, or whether this is already final.

Thank you, Honourable Bakri. This matter is still being discussed, and we will also engage international companies to convey the decision of the Government of Malaysia in due course. Honourable Sibuti raised the matter of the hydrogen economy. I am pleased to inform you that we are developing a technology road map to mainstream initiatives and projects related to hydrogen technology, providing a direction for the hydrogen economy in terms of new generation and storage technologies. This includes R&D at university level, including the Sarawak hydrogen project and partnership with PETRONAS. NanoMalaysia's hydrogen generation technology and the potential for PETRONAS to enter the blue hydrogen market in Peninsular Malaysia. We project the potential impact of this hydrogen economy on GDP to be USD2 billion by 2025, and it is a sector that we will make a focus sector in the Twelfth Malaysia Plan later. Honourable Sibuti also raised the issue of the National Registration Department (JPN) and the Chemistry Department. The Chemistry Department of Sabah and Sarawak is ready to provide DNA analysis services. Our consumable costs are being negotiated with JPN so that they are not too high for those who wish to request DNA analysis. I am aware that at JPN Sabah and also at several other places, they do not follow sampling procedures, and this matter we will try to resolve as raised by Honourable Sibuti just now. Honourable Dungun, Honourable Jerai, and Honourable Sibuti raised the STI Culture Programme, the National Science Centre (PSN) and the National Planetarium. Among the ministry's initiatives is upgrading the infrastructure and also the infostructure of the National Science Centre, covering facility development, improvement of educational programmes and upgrading of exhibitions. This effort aims to make STEM-based learning more attractive through informal approaches, more interactive and informative science learning, thereby providing double comfort and enjoyment to students. PSN also promotes STEM through the organisation of competitions at national level. Among the competitions that have been organised are the robotics competition, the national remote-control jet competition and also the national tinkering challenge. The ministry, through the PSN Outreach Unit, has also been actively moving throughout Malaysia to carry out Outreach Programmes to promote STEM in schools. The Outreach Programmes run by the National Science Centre are systematically organised by zone throughout Malaysia. For the information of Honourable Dungun, National Science Week - COVID-19 did not hinder science culture activities. We have carried out, for example, the National Science Competition virtually this year, and it still received participation from 1,024 school teams. Honourable Hulu Selangor...

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Kuala Selangor, Kuala Selangor.

Honourable Kuala Selangor, sorry, Honourable Kuala Selangor raised the issue of Silterra and also the issue of – I agree with Honourable Kuala Selangor that semiconductors or integrated circuits have become the backbone of our economic development for the future. Firstly, I would like to inform Honourable Kuala Selangor that the Cabinet is preparing a joint memorandum by the Ministry of Science, Technology and Innovation (MOSTI), the Ministry of International Trade and Industry, and the Ministry of Finance so that we can take a national interest position before a decision is made regarding the future of Silterra. So Khazanah Nasional has been informed that before any decision is made regarding Silterra, it must first be discussed at Cabinet level so that a national interest decision is made regarding the future of Silterra. Honourable Kuala Selangor and also Honourable Bandar Kuching, Honourable Kimanis, and Honourable Arau have raised the issue of vaccines. I would like to take a little time to explain. There is still much more, but I will go to this matter and after that to Honourable Pasir Gudang. Insya-Allah, after that I will wind up. Firstly, regarding this allocation of RM3 billion. I admit that the sum of RM3 billion cannot be found in the expenditure estimates under this item because it will be tabled under the COVID-19 Trust Fund, as announced by the Honourable Minister of Finance. So this RM3 billion will come from the special fund for COVID-19. Regarding the issue raised by Honourable Kuala Selangor and also Honourable Bandar Kuching concerning the announcements made by private companies. I would like to explain here, and the Honourable Minister of Health is also on my left, that this announcement is an announcement regarding private sector cooperation. It has nothing to do with government procurement. Any company may negotiate with international companies to become their agent, to become their distributor and so on. We cannot control whether they make a commercial arrangement with companies or vaccine manufacturers abroad. However, if they do not obtain approval from, for example, Clinical Research Malaysia, they cannot conduct clinical trials here. If they do not obtain approval from the NPRA under the KKM, they cannot bring vaccines into Malaysia. So on behalf of the Government, MOSTI and the Ministry of Health Malaysia, we cannot prevent these companies, which in fact have no direct connection with medicine, with logistics and so on. They may be trying to pivot to other industries, they make private commercial deals with companies at international level. However, I would like to inform the investor market in Malaysia that this announcement does not mean that they have obtained government procurement. Government procurement so far is only with COVAX, 10 percent of the population, and Pfizer, 20 percent of the population, which was done directly with Pfizer without any middleman or third party being used. Honourable Kuala Selangor.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, Honourable Minister. I congratulate you on your commitment to ensuring that the interests of the nation and the people on the Silterra issue just now are pursued until we can thoroughly resolve it well.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

As for the point raised by the Honourable Minister just now, I fully understand it. It is a transaction involving the private sector, and that is outside the interest of MOH. However, is the Honourable Minister prepared to ensure, for the sake of the interests and welfare of the people, that the price can be capped at – there shouldn't be any exorbitant, with respect, excessive prices, because that is where what is called profiteering takes place, Honourable Minister. That is one point I want to emphasise. Please ask the Honourable Minister to explain. Pfizer just now was G2G. That is also – how can that be, was it a Cabinet decision? Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Kuala Selangor.

Dr. Kelvin Yii Lee WuenDAP · PHBandar Kuching

Tambah sedikit.

Honourable Bandar Kuching.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

I just want to ask, I understand this is certainly not that. I mean private negotiation, but is the ministry planning to – how to monitor the quality of the whole distribution chain even though the company MyEG has no track record? Does the ministry have a mechanism to monitor and ensure that the quality that reaches the end user is maintained? That is all, thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Bandar Kuching. Please.

Berkenaan dengan...

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Minister, how many more minutes do you want? Three minutes, four minutes?

Five minutes if possible.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Five minutes. Alright. Five more minutes.

Regarding the price, Honourable Kuala Selangor. So far, according to our negotiations, we are negotiating directly with the company. So, government to business (G2B), I suppose, and the price is an ex-factory price. The price given by the company and there are no additional prices. If it is necessary in terms of logistics, transport and so on, like the example of Pfizer that I have already mentioned, the price covers delivery but does not cover storage cost, that is another matter. However, perhaps after this there will be negotiations and we will get a price, but that price does not include logistics, does not include...

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Sorry Honourable Minister, the RM2 billion does not include logistics and storage?

RM3 bilion you mean?

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

No, what was mentioned is RM2 billion inclusive of one thing. That one is the storage.

No, No, no, RM3 billion is the overall total.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala Selangor

Betul.

And we are trying, within that overall total, to take everything into account. Procurement includes storage and includes transportation. So far we are still within that target.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Only for Pfizer?

No, no. Not Pfizer, all of them.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

My question, Honourable Minister, is that I found, for Pfizer alone, that its commitment is RM2 billion for vaccines and RM1 billion for logistics and storage. Is that true? That is according to reports.

This is a statement that went viral today, which supposedly was made in the name of Honourable Gua Musang. He said the procurement price of Pfizer reached USD2 billion. Storage for everything reached USD1 billion. I can categorically state in the Dewan Rakyat that this is baseless and not true at all. [Applause] I cannot state the actual procurement price with Pfizer because it is under NDA. This is a common matter, Honourable Kuala Selangor also knows. When you enter into a non-disclosure agreement. However, our agreement with Pfizer and also with COVAX is still well within our reach of RM3 billion for 70 percent of the population. That is what I can inform you. Regarding what was raised by Honourable Bandar Kuching just now concerning quality and so on. Everyone who wants to register their vaccines in Malaysia must go through the NPRA. Every company that wants to take part in any part of vaccine manufacturing must also obtain approval from the NPRA. They must obtain approval from good management practice and so on. Because there are vaccine manufacturers, for example from China, who are interested in coming here not only to sell, but to carry out the bottling process. What is called fill and finish. That also requires regulatory approval before it can be implemented.

Dr. Kelvin Yii Lee WuenDAP · PHBandar KuchingEN

My issue is not production or manufacturers. I know there are criteria required, but distribution. If it is given to the company MyEG, which has no track record, will they be able to keep the quality that is required? That is all, thank you.

That is why distribution is also a matter that receives regulatory attention. We will not give it to any company that does not have distribution capacity that can maintain the stability of the vaccine.

[Speaking without using the loudspeaker]

Yes, but we do not know, they may make investments, I am not sure. They make commercial agreements and it is up to those companies. Perhaps they will make investments, perhaps they will form a JV or cooperation with companies that are commonly involved in transportation of vaccines. I say here that, yes, I know, companies that have no connection at all are also trying to take part in vaccines. Myself and the Honourable Minister of Health, we stand firm on regulatory approval, that is first. Second, but if there is an effort from that company to obtain expertise, that is up to them. But we must make sure that quality and safety are assured. That, I guarantee to you.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Last point, Minister...

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Only 45 seconds.

Datuk Seri Dr. Haji Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Last one. Last, yes. This is Pfizer. The price given to us is in the category that they are low and middle-income countries (MICs), therefore the price is 10 per dose more or less – does not RM19.50 tier pricing. Is this true? This is something I want to raise for the Honourable Minister to explain.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Kuala Selangor.

Yes, thank you, Honourable Kuala Selangor. Honourable Kuala Selangor, I cannot state the details. However, it is indeed true that Pfizer has tier-based pricing. We are in a tier that, in the view of the Government of Malaysia, is acceptable. That is what I can say. That is all the time available, Mr Chairman, and I will answer the rest in writing with full details. Thank you.

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Thank you, Honourable Minister of Science, Technology and Innovation. Honourable Members, the question is that the sum of RM510,195,600 for Head B.30, Operating Expenditure Estimates 2021, be made part of the Schedule. [Question put and agreed to] [Head B.30 became part of the Schedule]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

The question is that the expenditure under Head P.30, Development Expenditure Estimates 2021, be approved. [Question put and agreed to] [Head P.30 became part of the Estimates] [The House resumed] [Deputy Speaker (Dato' Mohd Rashid Hasnon) chaired the Meeting]

Mr Chairman (Dato’ Mohd Rashid Hasnon)EN

Honourable Members, the sitting of the House today is adjourned until tomorrow at 10.00 am, Tuesday, 8 December 2020. Thank you, Honourable Members.

[The House was adjourned at 3.28 pm]

Special ChamberSpecial Chamber

[Mr Speaker presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Addition of Bachelor's Degree Programme at Universiti Malaysia Sabah (UMS) Sandakan CampusSpecial Chamber

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Speaker. Honourable Minister, I would like to draw the Honourable Minister's attention to the urgent need to offer more undergraduate programmes at Universiti Malaysia Sabah (UMS), Sandakan campus.

In 2006, UMS established the Faculty of Sustainable Agriculture at its Sandakan campus, located in Sungai Batang. However, so far it offers only 3 undergraduate programmes, namely Crop Production, Horticulture and Landscaping, and Live Stock Production.

According to statistics from the Ministry of Education Malaysia (KPM) obtained in 2019, only 398 students were studying at UMS Sandakan campus, even though the UMS Sandakan campus can accommodate 1,000 students at one time. The limited choice of programmes at the Sandakan campus has indeed made it difficult to meet the aspirations of students who are qualified to pursue university education.

Therefore, I would like to propose that the ministry increase the number of programmes offered at the Sandakan campus by moving the Faculty of Science and Natural Resources from the Kota Kinabalu campus to the Sandakan campus. The postgraduate programmes currently offered by the Faculty of Science and Natural Resources include:

(i) Conservation Biology;

(ii) Aquaculture;

(iii) Marine Science;

(iv) International Tropical Forestry;

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

(v) Park Management & Recreation;

(vi) Agroforestry;

(vii) Wood Technology & Industry;

(viii) Environmental Science; and

(ix) Biotechnology.

Mr Speaker, by moving the Faculty of Science and Natural Resources, which offers 9 additional postgraduate programmes as listed above, to the Sandakan campus, we can not only overcome the limited postgraduate programmes available in Sandakan, but also complement the specific sectors in Sandakan that meet the country's strategic needs. For example, the headquarters of the Sabah Forestry Department is located in Sandakan, and various forest research facilities have been established at Sepilok, Imbak Canyon and Deramakot Forest Reserve.

In addition, Sandakan's well-known nature conservation culture through the Sepilok Orangutan Rehabilitation Centre, Borneo Sun Bear Conservation Centre, Rainforest Discovery Centre, Selingan Turtle Islands Park and Kinabatangan Wildlife Sanctuary, all the above programmes will complement Sandakan.

Therefore, I sincerely urge the Honourable Minister of Higher Education to implement the above proposal to move the Faculty of Science and Natural Resources to the Sandakan campus as a strategic step to develop and nurture world-class graduates in the fields of science and natural resources for Malaysia. Thank you.

Mr SpeakerEN

Thank you. The Honourable Minister may proceed.

Dato’ Dr. Noraini AhmadUMNO · BNMinister of Higher Education · Parit SulongEN

Thank you, Mr Speaker. The Ministry of Higher Education (KPT) would like to extend its heartfelt thanks to the Honourable Member for Sandakan for the concern shown towards issues related to higher education.

As the Honourable Member is well aware, human capital is among the most important components in driving economic growth and the development of a nation. To achieve the goal of becoming a developed nation, the people need to be equipped with knowledge, skills and competencies so that they can make meaningful contributions.

In this context, it is clear that the role of KPT is critical

Dato’ Dr. Noraini AhmadUMNO · BNMinister of Higher Education · Parit SulongEN

in shaping and producing human capital that is knowledgeable and highly skilled, in line with the needs of the nation. In carrying out this responsibility, apart from regulating private higher education institutions (IPTS), KPT also provides access to quality higher education through the offering of academic and skills programmes at 20 public universities, 36 polytechnics and 104 community colleges throughout the country.

In the state of Sabah alone, a total of 12 higher education institutions (IPT), including three polytechnics and eight community colleges, have been provided to meet higher education needs, especially for local communities. Meanwhile, in the Sandakan District, a total of three IPTs, comprising the UMS Branch Campus, one polytechnic and one community college, have been provided.

At present, the Faculty of Sustainable Agriculture (FPL) at the UMS Sandakan Branch Campus offers nine programmes at undergraduate and postgraduate levels. A total of three bachelor's degree programmes are offered at undergraduate level, while four master's degree programmes and two doctoral programmes are offered at postgraduate level.

As of November 2020, a total of 396 students are studying at the campus, 86 per cent or 341 are undergraduates and 14 per cent or 55 are postgraduates. Regarding the Honourable Member's proposal to move the Faculty of Science and Natural Resources from the UMS Main Campus to the UMS Sandakan Branch Campus, several factors need to be and will be studied first before any decision can be made so that the quality of education is not affected. Among them are:

(i) the Bachelor of Aquaculture and Bachelor of Marine Science programmes have been offered at the main campus since 2000 and have complete learning support facilities at the Borneo Marine Research Institute, such as fish farms, aquariums, a marine museum, laboratories and incubators, as well as support systems from the industry in the surrounding area;

Dato’ Dr. Noraini AhmadUMNO · BNMinister of Higher Education · Parit SulongEN

(ii) the capability and competency of teaching staff at the Sandakan Branch Campus, who require skills training to conduct teaching and learning (PdP) sessions for the new programmes;

(iii) the availability of facilities such as laboratories and lecture halls to accommodate the needs of students for the new programmes that will be offered; and

Dato’ Dr. Noraini AhmadUMNO · BNMinister of Higher Education · Parit SulongEN

(iv) good internet access capability to support students' PdP sessions.

UMS is also currently finalising the offering of two more academic programmes through the Faculty of Sustainable Agriculture, namely the Bachelor of Agrotourism with Honours and the Diploma in Agriculture.

Meanwhile, as medium and long-term strategies, UMS is also restructuring the study programmes offered by taking into account the IR4.0 elements, the need for precision farming, industry involvement, the National Agriculture Policy and the direction of the Sabah State Agriculture Policy 2017-2026. Thank you.

Mr SpeakerEN

Thank you, Honourable Minister.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — RM50 million maintenance allocation for SJKC and SJKT respectivelySpecial Chamber

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Speaker. Thank you also to the Honourable Deputy Minister of Education II, who is present this afternoon to answer my question. Today, allow me to raise an issue related to the maintenance allocation of RM50 million each for Chinese national-type schools (SJKC) and Tamil national-type schools (SJKT).

On 16 November 2020, my Oral Question (No. 43) was answered and a reply was given. Based on the reply provided by the Ministry of Education, several follow-up questions have arisen.

I request the Honourable Deputy Minister to provide answers to the following matters:

(i) please list the names of the SJKC and SJKT schools that have received this maintenance allocation and the amount received by each school, as well as the date the school received it. Perhaps it can be done in writing because there are hundreds of schools, I know. Later it will be difficult for the Honourable Deputy Minister to mention all of them;

(ii) what are the criteria, factors or considerations of the Ministry of Education when considering applications from schools;

Tuan Cha Kee ChinDAP · PHRasahEN

(iii) why the number of SJKC and SJKT schools receiving allocations under this purpose has decreased significantly compared with previous years;

(iv) what types of assistance have been or will be channelled by the Ministry of Education to other schools that failed to receive allocations under this heading;

(v) whether the Ministry of Education is of the view that this amount is adequate or otherwise for SJKC and SJKT; and

(vi) what is the commitment of the Federal Government and the Ministry of Education that this allocation with the same amount will be channelled in 2021, because this question was submitted before the announcement by the Honourable Minister of Education.

Thank you, Mr Speaker.

Mr SpeakerEN

Thank you. The Honourable Deputy Minister may proceed.

Dato’ Dr Mah Hang SoonDeputy Minister of Education IEN

Thank you to the Honourable Member for Rasah, Tuan Cha Kee Chin. Mr Speaker, the Ministry of Education Malaysia (KPM) always strives to provide complete facilities and amenities to all schools regardless of stream, to create a conducive learning environment for all students, including Chinese national-type schools and Tamil national-type schools.

For the information of the Honourable Members, in 2020, KPM was approved a maintenance allocation of RM800 million, including RM50 million for the maintenance of Chinese national-type schools (SJKC) and RM50 million for the maintenance of Tamil national-type schools (SJKT). However, a total of RM223.3 million of the overall allocation was placed under a withholding warrant by the Ministry of Finance.

Therefore, the current distribution of the maintenance allocation is RM46.57 million for SJKC and RM46.41 million for SJKT. The details are as follows:

Dato’ Dr Mah Hang SoonDeputy Minister of Education IEN

(i) 311 SJKC with government school status amounting to RM26.91 million;

(ii) 291 SJKC with government-aided school status amounting to RM19.66 million;

(iii) 118 SJKT with government school status amounting to RM7.66 million; and

(iv) 221 SJKT with government-aided school status amounting to RM38.75 million.

I also wish to refer to the KPM's reply to the Oral Question on 16 November 2020 regarding the same matter. It was informed that the channelling of the maintenance allocation totalling RM89.67 million to SJKC and SJKT was before taking into account the withholding warrant by the Ministry of Finance.

For the information of the Honourable Members, KPM has also received an allocation of RM100 million under the 2020 Economic Stimulus Package (PRE).

This allocation is to improve the level of hygiene of teachers and students, such as the procurement of body temperature scanners, hand sanitisers and hand-washing soap, as well as minor maintenance of schools across the country following the outbreak of the COVID-19 pandemic.

In considering maintenance allocation applications from all government schools and government-aided schools, KPM uses General Circular No. 2/2012, Procedures for the Management of Government Immovable Assets, as the main reference. Channelling is carried out based on scope, namely only involving the maintenance of immovable assets, the level of damage and the actual repair cost reported. The number of schools in 2020 decreased due to the allocation restrictions imposed on KPM. In addition, the number of allocations is distributed according to priority and the actual needs of schools.

Apart from maintenance allocations, KPM also provides assistance to all government-aided schools (SBK) in the form of payment of emoluments for teachers and support group members appointed by the government, as well as payment of utility bills, namely electricity, water and sewerage, with a total not exceeding RM5,000 based on actual monthly bills.

Apart from that, KPM also provides allocations for Security Control Services, Building and Compound Cleaning Services and Cooked Food Supply Services to all government schools and government-aided schools.

Dato’ Dr Mah Hang SoonDeputy Minister of Education IEN

For the information of the Honourable Members, the allocation KPM has received thus far is certainly insufficient to carry out comprehensive maintenance across all 10,223 schools under KPM's supervision. However, KPM has made efforts to maintain schools that truly need it or require maintenance and repair. Maintenance and repair are carried out according to priority, namely based on the level of damage.

KPM is committed to ensuring that all schools are in a safe and comfortable condition for use by all students and education personnel. Therefore, starting in 2021, KPM will fully use the Education Management Information System (EMIS) to record damage and maintenance needs in all government schools and government-aided schools. Through this approach, KPM will be able to ensure that maintenance allocations are channelled to schools that need them based on the level of damage and actual repair costs.

For the information of the Honourable Members, a total of RM800 million has been allocated for the maintenance of schools and educational institutions under the administration of the Ministry of Education (KPM). KPM is also fully responsible for managing the distribution of the allocation. Under the Education Act 1996, it is the government's responsibility to fully maintain government schools. At the same time, the government may provide contributions of assistance to government-aided schools.

Relatively speaking, the maintenance allocation received is quite limited based on the number of schools and educational institutions under KPM's administration. Hence, it needs to be distributed carefully, thoroughly and prudently to ensure optimal impact. Of the overall allocation of RM800 million, the breakdown of distribution is as follows:

(i) RM620 million for the maintenance of schools under KPM's administration;

(ii) RM30 million for critical additional allocation;

(iii) RM50 million for the maintenance of educational institutions under KPM's administration;

(iv) RM50 million for slope repair; and

(v) RM50 million for upgrading or building open halls.

Dato’ Dr Mah Hang SoonDeputy Minister of Education IEN

Regarding the distribution of the maintenance allocation, KPM uses a formula that takes into account the number and type of schools, whether under the government school category or government-aided school category, in distributing allocations for 2021. The basis of calculation is based on the average of the RM620 million allocation for 10,223 schools, which is RM60,648 per school.

The ceiling allocation for government-aided schools is calculated based on 90 per cent of the said average multiplied by the number of 1,930 government-aided schools. This makes the ceiling allocation for government-aided schools RM105.34 million.

Meanwhile, the ceiling allocation for 8,293 government schools is based on the maintenance allocation for schools of RM620 million minus the ceiling for government-aided schools. This makes the ceiling allocation for government schools RM514.66 million.

Therefore, based on this formula, Mr Speaker, the ceiling allocations by school type are as follows:

(i) RM477.48 million for primary and secondary schools with government school status, including fully residential schools and vocational colleges;

(ii) RM1.2 million for primary and secondary schools with government-aided school status;

(iii) RM74.07 million for Chinese national-type schools with government school and government-aided school status;

(iv) RM29.98 million for Tamil national-type schools with government school and government-aided school status;

(v) RM20.94 million for mission schools with government school and government-aided school status;

(vi) RM4.11 million for conforming schools with government school and government-aided school status; and

(vii) RM12.23 million for government-aided religious schools.

For the information of the Honourable Members, KPM is aware that there are school types that receive a lower ceiling allocation compared with others. To that end, RM30 million out of the RM750 million maintenance allocation for schools and educational institutions is specifically set aside to cover any critical maintenance needs for school types whose ceiling allocation is RM30 million and below. Thank you.

Dato’ Dr Mah Hang SoonDeputy Minister of Education IEN

Thank you, Honourable Deputy Minister.

Mr SpeakerEN

Thank you, Honourable Deputy Minister.

Honourable Members all, with that, the debate session under the Motion on Matters of Governance pursuant to Standing Order 17 today is concluded. Accordingly, today's Special Chamber Sitting is adjourned until 12.00 noon on Tuesday, 8 December 2020.

Assalammualaikum.

[The Special Chamber was adjourned at 12.24 p.m.]