Dewan Rakyat · 2 November 2023
15th Parliament, session 2, meeting 3 · 984 turns · 57,307 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) presided over the Sitting]
Time for Questions to MinistersQuestions
The floor is given to Tuan Lim Guan Eng, the Honourable Member for Bagan.
1. Tuan Lim Guan Eng [Bagan] asks the Minister of Natural Resources, Environment and Climate Change to state regarding the Mengkuang Dam, which has been listed by the National Water Services Commission (SPAN) as one of seven high-risk water dams in Malaysia, by stating the actions that can be taken to overcome the weaknesses, and whether allocations will be provided to help Mengkuang Dam avoid becoming high-risk so that it can carry out its function of ensuring continuous and reliable water supply to consumers in Penang.
The Honourable Minister of Natural Resources, Environment and Climate Change.
Thank you, Mr Speaker, and the Honourable Member for Bagan. The statement issued by SPAN recently is based on the 2022 Water Supply Monitoring Report on dams at high risk. I would like to explain that the Risk Assessment of these dams takes into account the age, level records, and also the water storage of the dams, as well as the total number of water treatment plants in the dam areas. This is not related to the structural safety of the dam itself. That is covered by another report issued by the flying squad, which examines the conditions of the dams in our country. The Sungai Dua Water Treatment Plant (LRA) has a design capacity of 1,228 million litres a day, representing almost 77 per cent of the water supply for the whole of Penang State, because there is a submarine pipe linking Seberang Prai and Penang Island. Water from Mengkuang Dam, which is a strategic dam, will be released when the quality of the Muda River is affected, due to floods or low river water levels during the dry season. To ensure the sustainability of water supply, SPAN has taken the following initiatives: (i) it has drafted nine identified action plans, including strengthening the communication plan among stakeholders, coordination with water supply operators and sewerage, and actions that need to be taken by SPAN. Among them is a review of the memorandum of understanding
among water operators and the existing guidelines. This follows the El Nino phenomenon that we are currently facing; (ii) joint coordination with related agencies such as the Water Supply Division (BBA), the Department of Irrigation and Drainage (JPS), the National Hydraulic Research Institute of Malaysia (NAHRIM), MetMalaysia, state water regulatory bodies, and dam operators on issues of water release and storage in dams; and (iii) systematic management and monitoring of storage as well as the preparation of dam SOPs during the summer or dry season, including the study of inflow forecasting projections, with permission, and dam capacity for more effective water resource management. Mr Speaker, the responsibility for ensuring sustainable water resources is the responsibility of all parties, including the state government. For the information of the Honourable Member, I will conduct a working visit to Mengkuang Dam on 8 November next week to inspect and see for myself the condition and operation of this dam. So, I hope all state governments responsible for water resources will ensure they take proactive measures by controlling land use activities and also pollution, and also that consumers exercise prudence when using water. Thank you.
Supplementary question, the Honourable Member for Bagan.
Thank you, Mr Speaker, and thank you to the Honourable Minister. Given that when the report was issued by SPAN on Mengkuang Dam as one of the high-risk water dams, it has also caused anxiety among the public about water supply, whether it will be disrupted or cut off. What actions should be taken by the ministry, and also BBA Holdings as the operator, to ensure this does not happen, in particular. What is the immediate threat to the water supply? As asked in the original question, will the Federal Government provide allocations to overcome this problem? Finally, Honourable Minister, to prevent the problem of high-risk dams threatening the water supply in the long term, will the government also expedite the water project from Sungai Perak to Penang, so that not only Penang but also the state of Perak will ensure continuous water supply assurance for both states. That is all, thank you.
Thank you, Honourable Member. As we are well aware, the matter of water resources falls under the jurisdiction of state governments, but of course at the level of the Federal Government we want to ensure sufficient water supply for all states within the Federation of Malaysia. We know that, in a situation where water demand is increasing due to population growth and also pressure from climate change, the reality of water transfer, or transfer of water between states, is becoming increasingly necessary. Now we have seen water transfers, with permission, from Pahang to Selangor, water transfer from Johor to Melaka, and water transfer from Kedah to Penang. These are what already exist. In the future, perhaps more of these things will happen, and including what we have been studying all this time, of course between Perak and Penang.
There are several matters, as I have emphasised, that both state governments need to take the initiative to discuss this. The Federal Government is ready to act as facilitator, and I have received indications from both sides of the government that these discussions can begin well, and this was recently voiced at the National Water Council meeting chaired by the Honourable Prime Minister and attended by the MB of Perak himself and also Exco Zairil from the state of Penang. The second matter, as I also mentioned yesterday, is that water tariffs also play an important role, because currently the water sector in Malaysia is not economic, because our tariff is set too low. So there is a lack of investment, pipe replacement and so on. That is why we see the NRW rate still being high in many states. Therefore, as I have said, there is a cross-party consensus in state government discussions for us to review water tariffs in the states, and we in the Federal Government will prepare a Cabinet Paper on this matter in the very near future.
The floor is given to the Honourable Member for Kubang Kerian.
Thank you, Honourable Minister, for the answer given. My question is, if we look at the data available, Penang is among the states that have a fairly high reserve margin, more than 20 per cent, compared with other states that are more critical, such as Selangor, Kelantan and so on. My first question is, how often is Mengkuang Dam actually used, because the government spends a lot, but its usage is very minimal. I understand it is used only once or twice a year. So we compare it with other states, but I am not talking about need. The second is that I need data, perhaps a written reply, on the total number of water supply dams for each state. That can perhaps be a written answer. The third is about the latest status of the Off-River Water Storage (TAPS) Machang, because we know TAPS is a mechanism to overcome problems when there are threats or prolonged drought and pollution of main rivers. Thank you.
Thank you, Honourable Member for Kubang Kerian. Firstly, in terms of Mengkuang Dam or the water supply in Penang as a whole. The core issue is that Penang does not have a large water catchment area, with permission. As a small state, they now rely heavily on the Muda River from Kedah. That is a very major source of supply for the state of Penang, and they have a high population and a rapidly growing industrial sector. So on that basis, there is a need, firstly, for dams such as Mengkuang Dam, but also to diversify water sources for the people of the State of Penang, and the discussions between the State Government of Perak and Penang are important so that the state of Penang can have a better water supply. In terms of operations, in terms of NRW, perhaps also because the state is somewhat small compared with many other places, Penang is at a good level, but in terms of supply it has become very critical. Secondly, earlier it was mentioned about...
Water supply dams by state.
Oh, okay, okay. For that one, I will give a written answer to the Honourable Member, and the last one, the status of TAPS Machang, I will also give in writing to the Honourable Member. That too, I know, is a very important matter because it has two aspects, and this is actually common to many states, namely the problem at the treatment plant level as well as in terms of NRW distribution.
I think it cannot move on just one aspect. If the water supply is insufficient, changing all the pipes is also not worthwhile, but if we only focus on supply and do not replace pipes, then all the money invested in the treatment plants will also be largely wasted, because the water does not reach consumers. The others I will give in writing. Thank you.
Thank you, Honourable Minister.
Sibu.
The Honourable Member may sit. Second oral question. The floor is given to Tuan Shaharizukirnain bin Abd. Kadir, the Honourable Member for Setiu.
2. Tuan Shaharizukirnain bin Abd. Kadir [Setiu] asks the Minister of Health to state the ministry's position regarding the issue of the Pandemic Treaty of the World Health Organization Convention (WHO CA+) and the amendments to the International Health Regulations (IHR 2005), which must be decided whether to be ratified or rejected before 1 December this year.
Thank you, Mr Speaker, thank you to the Honourable Member for Setiu. Mr Speaker, I would like to express my heartfelt thanks to the Honourable Member for Setiu for the question raised today, and I believe this is the best opportunity, Mr Speaker, for the Ministry of Health Malaysia (KKM) to explain to all Honourable Members and the people of Malaysia about this issue. Following the COVID-19 pandemic that struck the whole world in 2019, approximately 6.6 million lives were lost globally. All countries are of the view that it is very important to learn lessons from this COVID-19 pandemic so that action to prevent, protect, control and provide response can be strengthened to face the threat of infectious diseases in the future. During the special session of the World Health Assembly to consider developing a World Health Organization (WHO) convention, agreement or other international instrument on pandemic preparedness and response, with permission, held from 29 November to 1 December 2021, member states together with WHO also agreed as follows. Mr Speaker, with permission, I will read it in English. "To establish in accordance with Rule 41 of its rules of procedure and intergovernmental negotiating body open to all member states and associate members that IMB to draft and negotiate a WHO convention agreement or other international instruments on pandemic prevention, preparedness and response with a view to adoption under Article 19 or under other provisions of the WHO Constitution as may be deemed appropriate by DINB". Next, at the 75th World Health Assembly (WHA) held from 22 to 28 May 2022 which has passed. Member states also agreed to a resolution, namely, with permission, strengthening WHO preparedness for and response to health emergencies, to implement targeted proposed amendments. I emphasise once again, targeted proposed amendments to the International Health Regulations 2005, namely IHR 2005. As a result of WHA 75, all member states together with WHO have agreed to establish two international negotiation platforms, namely, first, the Intergovernmental Negotiating Body, or INB, to produce an international instrument known as WHA CA+ or the Pandemic Agreement. The second is the Working Group on Amendments to the International Health Regulations (WGIHR) to make amendments to IHR 2005, namely the Amendments to IHR 2005. Mr Speaker, so far Malaysia has attended six out of ten sessions
of the INB negotiations, and the seventh negotiation session will be held on 6-10 November 2023. Mr Speaker, I ask for a little more time to answer this question.
As for the WGIHR negotiations, Malaysia has attended five out of eight negotiation sessions, and the sixth negotiation session will be held on 7 to 8 December this year. For the information of Mr Speaker, the INB and WGIHR negotiation sessions are still and will continue to be held until all negotiations are concluded in April next year, 2024. The draft WHO CA+ Pandemic Agreement and the said IHR 2005 amendments will be presented to WHA77 in May 2024, next year as well, for the consideration and approval of member states. Therefore, in answering the question of the Honourable Member for Setiu, I would like to inform that the position of the Malaysian Government regarding the new WHO CA+ instrument and the IHR 2005 amendments will not be decided for ratification or rejection before 1 December 2023. So, that is not true, yes, that allegation. As for WHO CA+ under Article 19 of the WHO Constitution, member states are given the opportunity to join, namely opt in to this new instrument, expected in May 2024, as I have informed just now. Until now, I would also like to emphasise once again that negotiations for the preparation of the WHO CA+ INB document are still at an early stage. No decision will be given until everything is agreed. Nothing is agreed until everything is agreed. Mr Speaker, for international-level negotiations, Malaysia is in the group that fights for the right of equality, namely the group of equity together with 28 other member states. This group of equity emphasises its position to fight for a new instrument that is fair, namely equitable, balanced, and robust. This is based on the experience of the COVID-19 pandemic, which caused many deaths, unexpected economic losses, disruption of movement, and injustice in the distribution and products of medicine such as vaccines, diagnostic equipment and other medicines. The group of equity, including Malaysia, will once again voice this group's position at the 7th WHO CA+ meeting to be held on 6 to 10 November 2023 this year. At the national level, Mr Speaker, KKM is currently actively conducting an engagement process with 12 agencies or ministries to examine the IHR 2005 amendments and WHO CA+, and the 12 agencies involved in this engagement process I would like to mention, are several ministries involved, namely the Ministry of Agriculture and Food Security, the Ministry of Science, Technology and Innovation, the Ministry of Finance, the Ministry of Foreign Affairs, the Ministry of Women, Family and Community Development, the Ministry of Transport, the Ministry of Domestic Trade and Cost of Living, the Ministry of Natural Resources, Environment and also Climate Change, the Ministry of Investment, Trade and Industry, the Attorney General's Chambers, the National Security Council, the Prime Minister's Department and also NADMA. So, we are not making decisions alone. In addition, two committees have been set up to examine the position of the Malaysian Government on this issue. These two committees are also made up of the 12 agencies or ministries I mentioned earlier, and the decisions made by these two committees will be brought to the Cabinet Meeting to be finalised. Mr Speaker, Malaysia's position on this issue is very clear. Firstly, the sovereignty and autonomy of the country must not be violated by any party. Any formulation in international law must not conflict with the Federal Constitution, must safeguard the sovereignty of the country, the powers of the Malay Rulers and also the powers of the Yang di-Pertuan Agong, and must not violate the human rights and freedoms of the people... [Applause]
Secondly, Malaysia upholds the principles of justice and solidarity in global health governance. Malaysia is of the view that it is important for developed countries to help developing countries with the resources they have. The distribution of resources must be fair and equitable. Thirdly, Malaysia's participation in these negotiations is driven by the goal of building a stronger and more sustainable health care system. Malaysia recognises the need to develop robust cooperation capacity and coordination among industries to enhance preparedness for any future outbreak. We do not know when the outbreaks will come. It may happen one year from now, or two years from now, we do not know. This approach aims to ensure that health resources are fair and accessible at the global level, contributing to a stronger health care system. Fourthly, the ministry prioritises transparency in conveying accurate information to the public. Public awareness campaigns and activities promoting a clear understanding of the processes taking place in the INB and WHR to the public can be seen through openness in the negotiations and the availability of information on the WHO website. Mr Speaker, to conclude my reply, for this question I once again wish to emphasise that the Unity Government will not, under any circumstances, compromise on any decision that contradicts the Federal Constitution... [Applause] The government is committed to safeguarding the sovereignty of the nation, the powers of the Malay Rulers and the powers of the Yang di-Pertuan Agong. On this occasion I would like to request the cooperation of all Honourable Members, including Honourable Setiu, yes, to stand together with the government on this issue in order to explain the current situation regarding this matter to all Malaysians. To all Malaysians out there, I also request that you do not be deceived by fake news that is widely spread on social media. That is all, thank you.
Honourable Setiu, supplementary question.
Thank you for the detailed reply given by the Minister. My question is, does the government intend to explain the details of the amendments proposed by the ministry to the WHO in the near future?
Thank you. As I have answered earlier, Mr Speaker, this information can clearly be obtained openly on the WHO website. I have no problem, perhaps some people do not understand because it is written in English, yes, Mr Speaker. The Ministry of Health (KKM) can play a role in translation, and we will make the answers, perhaps on matters related to the IHR, more understandable and easy, insya-Allah. I have also in fact issued several statements from my own side as Minister and also as Director-General, yes, and have also made videos, yes, and it is also in Bahasa Malaysia, Mr Speaker. Setiu and perhaps other colleagues can check and review our answers on this IHR. Thank you.
Honourable Tampin, please proceed.
Thank you, Deputy Speaker. As explained by the Honourable Minister, I find that the main objective of the agreement is very good, namely to strengthen the world's resilience against future pandemics. I have no doubt anymore because we— the amendments will not undermine the sovereignty of the nation.
I would like to request that the Honourable Minister explain briefly the advantages or benefits that the national health system and the people will obtain from the agreement. Another matter, Honourable Minister, I agree earlier that the ministry may be able to produce infographics or other means for us to disseminate the answers to address the issues that have gone viral, so that the public gets the real information. Thank you, Deputy Speaker.
The Honourable Minister.
Thank you, Honourable Tampin. Actually, we need to understand, yes, because the WHO— Malaysia is among the 194 countries that have been together in the WHO since 1958, Mr Speaker. Malaysia is now the host of the Global Service Centre which is currently located in Cyberjaya, yes, and we have entered into an agreement for 15 years to come. Actually, we have quite a big and wide interest and role in this WHO, yes. To ensure, for example, as I have already mentioned some matters in my earlier reply. Among others, we can also obtain expert training examples from the WHO because there are 194 countries, and there is a lot of experience that we can share together, in addition to benefits or other interests. We are also a member of the executive board, with respect, Mr Speaker, and this is the highest governing body in the WHO.
Actually, it is not that the WHO gives everything, for us to implement whatever they do, but we play a role in providing the best input also from the perspective of our country to them. That will be taken into account. So for me, actually there is no question of— What I mean is we are compromising, for example, our national sovereignty in the WHO and so on. Because there are interests from the health perspective at the global level that are also for Malaysia. Thank you.
Thank you, Honourable Minister. Next, I invite Tuan Chiew Choon Man, the Honourable Member for Miri.
3. Tuan Chiew Choon Man [Miri] asks the Minister of Communications and Digital to state what immediate action is being taken to address the issue of naked towers in Sarawak so that the problem of insufficient Internet access and communications network services no longer arises.
The Honourable Minister.
Thank you, Mr Speaker. Thank you, Honourable Member. Mr Speaker, the issue of naked towers, or towers without 4G or Internet services, which has long been raised in the state of Sarawak, has finally found a solution by the Federal Government through the Malaysian Communications and Multimedia Commission (MCMC). The SMART 600 Project involves the construction and operation of 600 telecommunications towers by a company owned by the Sarawak State Government, namely the tower operator, with a capital expenditure of more than RM1 billion for all these towers, fully financed by the Sarawak State Government. However, the locations of these SMART 600 towers are situated in interior areas where commercial returns are very limited, to the extent that mobile service providers find it difficult to reach a commercial agreement with the
tower operator for the provision of 4G services. This in turn has become the cause of the emergence of naked towers in the state of Sarawak. To ensure that 4G services can be provided to local communities in those areas promptly and to take into account the investment made by the Sarawak State Government, in principle the Federal Government, and the main mobile service providers namely CelcomDigi, Maxis, U Mobile, TM Tech and YTL Communications, have agreed to share the costs payable to the tower operator. For information, the financing from the Federal Government and the mobile service providers involves a total amount not exceeding RM207 million, namely RM119.4 million by the Federal Government through MCMC and the Ministry of Finance, and RM87.3 million by the mobile service providers for the towers concerned for a period of three years starting from 2024 until 2026. After that period, the mobile service providers will fully bear the cost of payments to the tower operator. A total of 3,000 interior and rural areas have been identified and will benefit under this initiative. With this initiative, it will end the issue of naked towers that has dragged on since 2019 in Sarawak. The operation of these towers for the provision of 4G services will be phased and will commence as early as January 2024. If not, even earlier than that. Apart from that, 4G services at the SMART 600 towers will also be provided by all five mobile service providers involved in this sharing model, namely CelcomDigi, Maxis, U Mobile, TM Tech and YTL Communications, thereby giving users more choices. The implementation of this initiative is also part of the JENDELA plan which targets the provision of 100 per cent Internet coverage in populated areas by the end of 2025, as well as becoming a catalyst and opening up digital economic activity opportunities among residents in the rural and interior areas of the state of Sarawak. That is all, thank you.
Honourable Member for Miri, supplementary question.
Thank you to the Minister for the initiative that will be taken for the benefit of the people of Sarawak. This has shown the concern of the Federal Government towards the people of Sarawak. My next question is, what about the towers that were built under the initiatives of the Sarawak Multimedia Authority (SMA) and the Sarawak Digital Economy Corporation (SDEC) previously that could not operate? I request the Minister to state the overall commitment of the Federal Government in terms of finance in helping to improve connectivity coverage and the provision of quality Internet services, as well as the benefits that can be enjoyed by the people of Sarawak after the National Digital Connectivity Plan (JENDELA) project is fully completed.
The Honourable Minister.
Thank you, Honourable Member. A very good question. My earlier reply covered the 600 towers under SMART 600 that are being implemented by SMA and SDEC. At the same time, the government, through MCMC, also manages a number of towers under the JENDELA programme, which, I am pleased to inform, in Sarawak so far based on the information I have, in total there are— For the state of Sarawak, 192 towers that are being or have been built by MCMC. I am pleased to inform that one of the things we have seen that delays the operation of these towers is issues involving sometimes land issues and electricity supply issues. Insya-Allah, today at 2.30 pm, we will hold a— we will table a paper at the National Council for Local Government to
initiate discussions with all Menteri Besar and state governments, including the Ministers and the relevant Exco members, to try to resolve this in bulk. I would also like to take this opportunity to inform that, out of all the towers, there are 594 towers that have been completed out of 1,661 towers under the JENDELA programme across the whole country, not only in the state of Sarawak, of which there are 196 waiting a long time for fibre installation. We are informed that the installation of towers takes nine months, Mr Speaker. Meanwhile, fibre installation takes another nine months. So, the duration is quite long. This causes people to misunderstand, seeing that there are towers in the village but no line. So, I have instructed that the 196 towers across the country that are to be fitted with fibre, given that the time is quite long, we ask for microwave equipment to be installed urgently, which takes less than three months, so that the line benefits can be enjoyed by residents whose towers have been completed in their areas. So, this has been instructed and insya-Allah MCMC will coordinate. Thank you.
Honourable Kapar, please proceed.
Thank you, Mr Speaker. I also refer to the original question earlier from Miri, and I am combining it with the JENDELA project under the ministry. So if combined, what percentage of Internet access will be provided to all those who need it in Sarawak, especially in schools? So, I want to know what their achievement is, especially in schools.
The Honourable Minister.
Yes, thank you, Mr Speaker. So basically, our effort is as I mentioned earlier, under the JENDELA programme, to ensure 100 per cent of populated areas get Internet access by 2025. Among the challenges I mentioned earlier are whether towers that were completed long ago but are not on-air, with respect, or problems involving land issues and electricity supply issues. So our intention, our objective, is not only for the state of Sarawak, but for all populated areas to get 100 per cent Internet access by 2025. This is very important because— it is important that I explain the definition of populated areas. Under the reporting by MCMC, we follow the definition given by the International Telecommunication Union (ITU), in which populated areas only involve areas where there are people. What this means is, among these populated areas, there are often areas where there are roads, but there are no residents. In such places, the Internet line is not good.
So, one of the things we basically want to do is, insya-Allah, we will start with a proof of concept, with respect, in the state of Melaka, where the basic principle is that wherever there is a road, there is Internet. This involves a small cost, discussions and agreement with state governments, including, insya-Allah later, with the state of Sarawak, so that we can resolve...
Minister, but 2025 is not far away.
Betul.
So, we hear from our friends from Sarawak, yes, I agree. Indeed these are populated places, that is why I focused just now on schools. Schools, yes, that is why they are important for developing Sarawak. So, is 2025 realistic for Sarawak?
Insya-Allah, insya-Allah, yes. So, among the matters we will pursue apart from JENDELA under MCMC, we have the Point of Presence Project which is being implemented under the KKD. This involves schools in interior areas and there is a very large number. I do not have that figure, but I will reply in writing to the Honourable Kapar and also to the Honourable Miri on the number of schools in their respective areas. However, I would like to explain to all Honourable Members that in the dossier prepared by MCMC for their respective areas, it is stated how many JENDELA towers and how many Point of Presence Projects involve how many schools. This information has been provided to Honourable Members in the dossier prepared by MCMC. If it has not yet been received, I have asked for it to be given to Honourable Members.
Together with its due date. Jerai, Jerai.
Yes, we ask for it before 2025, insya-Allah, yes.
Thank you, Honourable Minister. Honourable Members, the session for Ministers' Question Time today has now ended. Thank you, Honourable Member. [End of Ministers' Question Time session]
Oral QuestionsQuestions
We now begin the oral questions. I invite Tuan Cha Kee Chin, the Honourable Member for Rasah.
Thank you, Dato' Mr Speaker. My question is my first question.
1. Tuan Cha Kee Chin [Rasah] asks the Minister of Domestic Trade and Cost of Living to state whether the ministry will increase the quota of 60,000 metric tonnes of subsidised packet cooking oil, which has been implemented since 2016, given that the retail market constantly faces supply shortages and causes hardship to domestic consumers and micro and small traders. Provide an explanation of the ministry's decision/stand.
The Honourable Minister.
Bismillahi Rahmani Rahim. Thank you, Dato' Mr Speaker. Thank you to the Honourable Rasah for that question. In line with the Madani Budget 2024, the government is now focusing on subsidy targeting strategies. Subsidised packet cooking oil is no exception. Dato' Mr Speaker, as is known, the proposed addition of quota will lead to an increase in costs for the implementation of the Cooking Oil Price Stabilisation Scheme, or COSS. The implementation cost may also increase sharply in line with the movement of crude palm oil (CPO) prices. Therefore, the proposed addition of quota needs to
to be refined not only at the KPDN level but also jointly with other relevant ministries such as the Ministry of Economy and the Ministry of Finance, to ensure that any increase in quota does not have a negative impact on the government's financial position. To address the shortage of supply, the ministry has taken seven steps, including, first, continuing the policy of prohibiting all export of packeted cooking oil under the Supply Control (Export Prohibition) Regulations with effect from 1 August, which began on 1 August 2022, to ensure there is no leakage of subsidised packeted cooking oil to neighbouring countries. Second, enhancing the monitoring of supply of subsidised packeted cooking oil through the use of the ECOSS system. The ECOSS system records cooking oil sales transactions at various levels, including refineries, packaging companies, wholesalers and retailers, into one central database. This enables the ministry to monitor the distribution of subsidised packeted cooking oil in the market in real time and more effectively. Third, upgrading the ECOSS system to enhance the capabilities of the existing system, controlling sales of subsidised packeted cooking oil at the retail level so that sales are only permitted to the target group through the use of personal identification documents. The upgrading works are expected to be completed by mid-2024, Mr Speaker. Fourth, studying the distribution of packers according to population in each zone, repackers, with permission, and preventing sales of subsidised packeted cooking oil from leaving the designated zones. Designating zones will facilitate monitoring by enforcement officers and curb the occurrence of leakage. To ensure compliance with the zone designation directive, any sale of subsidised packeted cooking oil by packaging companies outside their designated zones, subsidy claims will not be accepted by the ECOSS system. Fifth, making regulations under the Supply Control Act 1961 to determine the recipients of the subsidy benefit for this packeted cooking oil in line with subsidy targeting. The sixth, a little more, Mr Speaker. Sixth, studying proposals for price adjustment, considering that the retail selling price of subsidised packeted cooking oil at RM2.50 per kilogram is very low. It is even lower than the price of used cooking oil, which is RM3.80 per kilogram, and also compared with bottled cooking oil, which is RM6.90 per kilogram, the ceiling price at present. As for number seven, to ensure the distribution of subsidised packeted cooking oil is orderly, the KPDN is also carrying out an internal audit. At the KPDN level, the full internal audit report will be completed in the first quarter of 2024, and the findings and results of this audit are important as a guide for improving the implementation mechanism and ensuring that the distribution of subsidised packeted cooking oil meets the actual needs of the target group. That concludes my reply, thank you, Mr Speaker.
Supplementary question from Honourable Rasah.
Thank you, Mr Speaker. Thank you, Honourable Deputy Minister, for the answer given. Based on the reasons of the seven steps outlined by the Honourable Deputy Minister, it seems the government still maintains its position of retaining the quota of 60,000 metric tonnes per month. Only I would like to suggest this: the Special Select Committee of Parliament once discussed this matter with the KPDN. I seek the government's view on whether it is proposed to increase by 10,000 metric tonnes per month to meet market demand. Not only domestic, including micro traders, for which I have information that it has reached 30,000 metric tonnes per month, consumption by micro traders. One more addition, Honourable Deputy Minister, I have received news from a source that there is an additional 5,000 metric tonnes quota per month that
began at the end of 2022, but this matter has never been officially mentioned by any officer or management of the KPDN. I seek confirmation from the Honourable Deputy Minister in this august House. Is the unrecorded addition of 5,000 metric tonnes of packeted cooking oil in the local market true or otherwise? Thank you, Mr Speaker.
Please proceed, Honourable Deputy Minister.
Thank you, Honourable Rasah. Mr Speaker, as we know, the official quota issued by the government today is 10,000 metric tonnes a month, and to add another 10,000 metric tonnes, we, the government today, as I said earlier, are focusing on subsidy targeting. If we can implement this subsidy targeting through the seven steps I mentioned earlier, according to our calculation, that additional 10,000 may not be needed at this time if we truly implement subsidy targeting. Because at present it is a bulk subsidy, it can be sold anywhere, anyone can buy it. So we are in the subsidy targeting step. Regarding the second part of the earlier question, I repeat my answer, step number seven just now, that the ministry is currently carrying out an internal audit, where in the first quarter of 2024 we will have the findings from that internal audit. I hope at that time Honourable Rasah, perhaps we can get an answer to the second question. I cannot answer today. Thank you, Honourable Member.
Please proceed, Honourable Jerlun.
Before that, Mr Speaker, I welcome the observers from Jerlun who are following today's sitting... [Applause] Regarding my supplementary question, concerning the issue of packeted subsidised cooking oil. I see there is some concern among consumers, including among micro entrepreneurs, regarding the adequacy of supply of cooking oil. Although efforts have been made by the government with the seven steps, mainly to carry out identification through ID as was stated by the Honourable Deputy Minister.
There will be leakage in that. This leakage may be caused by parties trying to make profits, as happened with rice, the issue of the other day. Packeted subsidised cooking oil can be converted into industrial cooking oil, from plastic packets into plastic containers which can be sold at a higher price. My question is, what efforts can the ministry carry out in the near term while awaiting the implementation of the proposed ID? Second, what mechanism can enforcement authorities use to ensure there is no more leakage of consumer goods among the public, as happened with the rice issue. As has been stated, these cartels still exist in the form of monopolies over consumer goods of the public. That concludes my question, thank you.
Honourable Minister.
Thank you, Honourable Jerlun. Mr Speaker, I explained earlier that one of the steps is to monitor the supply of subsidised packeted cooking oil using the ECOSS system, where through the ECOSS system we can know the supply chain of cooking oil from
the refinery, oil mill to repacker, to wholesaler and to retailer. This is the existing ECOSS system. So we monitor. If anywhere we find that packeted cooking oil is in a place where it should not be, we will be able to trace, with permission, Mr Speaker. Where it came from, which repacker, through which wholesaler. So that is what we are doing, Honourable Jerlun, and then we will upgrade it right down to the retailer. First the refinery, repacker, wholesaler, retailer. We want to add to consumers. So when the database of consumers eligible to receive subsidies is received from PADU in November. We can begin to see how the PADU database of consumers eligible to receive subsidies can be entered into the ECOSS system to add consumers. So from refinery, repacker, wholesaler, retailer, consumer. These are among the steps we will take to ensure there is no leakage, Mr Speaker.
A brief clarification. Earlier, reference was made to consumers. What I meant is micro entrepreneurs, because they trade every day. That concludes my reply.
Honourable Member, I think the Minister has already answered. Sit down.
...regarding consumers. Consumers are general. But if these entrepreneurs, they are specific.
Honourable Member, point of order. I also cannot force the Minister to answer, yes. Next, I invite Komander Nordin bin Ahmad Ismail TLDM (B) to speak.
Mr Speaker, before that, Kuala Kedah, Kuala Kedah. Allow me to welcome the farming community from PPK Kuala Sungai, the Parliamentary constituency of Kuala Kedah, led by Brother Basir bin Haji Ahmad and Brother Azizi bin Abdullah to follow the sitting this time. That concludes my remarks, thank you. [Applause]
Thank you, Mr Speaker. Breakfast in the morning is bread, Eating bread with kaya, Assalamualaikum, Honourable Deputy Minister, my question is number two.
2. Komander Nordin bin Ahmad Ismail TLDM (B) [Lumut] asks the Minister of Defence to state the future plans of the Ministry of Defence for seabed mapping works by the National Hydrographic Centre (PHN), even though the Royal Malaysian Navy (TLDM) had already decommissioned KD Mutiara in 2018.
Honourable Minister. Bread already in the morning.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and Salam Sejahtera. Mr Speaker, thank you to the Honourable Member for Lumut for the question raised. The Royal Malaysian Navy (TLDM), through the Pusat Hidrografi Nasional Malaysia (PHM), carries out seabed mapping using KD Perantau.
In addition to that. TLDM also carries out surveying using two leased vessels through a hydrographic survey services contract inclusive of support facilities for a period of three years from 1 January 2022 until 31 December 2024. For short-term planning, TLDM hopes to continue the vessel leasing contract to achieve the additional target of 108,000 square kilometres at depths between 50 and 100 metres. To that end, TLDM will continue the leasing contract for two survey vessels and one Autonomous Surface Vehicle (ASVs), which is expected to take four years and three months for areas at that depth as mentioned just now within Malaysian maritime waters. In addition, for depths of 0 to 50 metres, TLDM is in the process of procuring a hydrographic survey services contract involving the leasing of 2 Survey Motor Launches and two ASVs. This contract targets mapping of 14,000 square kilometres per year, or 42,000 square kilometres over a three-year period. For the long-term plan, TLDM plans to procure one hydrographic vessel under the Thirteenth Malaysia Plan, and this planning has taken into account the operational direction and replacement of KD Perantau, which is expected to become obsolete in 2030, after more than 30 years of service. In addition, PHM also plans to acquire four Survey Motor Launches under the Thirteenth and Fourteenth Malaysia Plans. That is the answer.
Supplementary question from Honourable Lumut.
Thank you, Honourable Member. Honourable Minister, we are well aware of the planning of the 15-5 programme. In that programme, there are only five classes of vessels. I seek clarification on whether this hydrographic vessel of TLDM is not included in that plan. I seek clarification.
YB Menteri.
For the information of the Honourable Member for Lumut, in fact, if we look at this hydrographic vessel according to the TLDM model. Although we know those classes are largely related to vessels such as LCS, LMS, our submarines, in fact we also include our hydrographic vessel in that 15-5 as part of that classification. However, how it is classified, we will leave it to TLDM itself to determine. That is all.
Please proceed, Honourable Shah Alam.
Thank you, Mr Speaker. Hydrographic surveying is important because it involves technical matters of the nation's maritime zone delimitation, marine scientific research, hydraulic studies for coastal development and also covers tourism. My question is, throughout the seabed mapping work carried out by TLDM, what discoveries have been achieved in mapping Malaysian waters? Thank you.
Honourable Minister.
Thank you to the Honourable Shah Alam for the question raised. We know that the main purpose for us to carry out seabed mapping, Mr Speaker, is three aspects which we usually give priority to at TLDM. First is the matter of security. Second is the matter of our own boundaries. Third is about the identity of Malaysia itself. That is why if we look at it, perhaps in terms of security, we know that the purpose of mapping the seabed is for our commercial ships and part of that is a mapping requirement
for us, and second is in terms of security itself. Whether security in terms of the trade aspect or the logistics aspect itself. The third, which I should perhaps also inform, as in the question from Shah Alam, is about the identity of Malaysia itself. That is why if we look at achievements made by TLDM in mapping our seabed, so far we have gazetted 17 discoveries on the seabed. Perhaps one or two discoveries that I might give as examples are among those we have gazetted, namely Santubong Sea Mount, whose height is 1,417 metres. So if we look at 1,417 metres, it is almost three times
This has already been gazetted by us as part of our discoveries and giving identity to Malaysia itself. That is why these discoveries are very important. 17 have been gazetted and in mid-November we will also gazette another 12 of our discoveries. So, with this identity, it actually has long-term effects on Malaysia's identity and the requirements of our boundaries at sea or Malaysia's maritime zone itself. That is all I wish to inform.
Question number 3 is deferred for a while. We proceed to question number four. Dato' Sri Dr. Haji Ismail bin Haji Abd Muttalib, Honourable Maran.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker. My question is number four.
[Question No.3 – Honourable Dato' Ngeh Koo Ham [Beruas] deferred]
4. Dato' Sri Dr. Haji Ismail bin Abd. Muttalib [Maran] asks the Minister of Local Government Development to state the total allocation for repairing and building new houses for poor urban residents, and the breakdown by race in Malaysia.
Thank you, Deputy Speaker. The Urban Poverty Eradication Programme under the Ministry of Local Government Development (KPKT) was first implemented in the Eleventh Malaysia Plan to provide comfortable and safe housing for occupation and to contribute to a quality and prosperous life for urban communities. The scope of this programme involves urban communities living in poverty within the operational areas of local authorities who are registered with the e-Kasih system under the supervision of the Implementation Coordination Unit of the Prime Minister's Department. The purpose of this programme is to provide a safe and comfortable residence for eligible household heads or household members to enjoy a quality and prosperous life. The aid rates set for this programme are as follows: (i) for repairing houses in urban areas, Peninsular Malaysia RM15,000. Sabah, Sarawak and the Federal Territory of Labuan RM17,000; and (ii) for building new houses in urban areas, the maximum limit is RM66,000. Sabah, Sarawak and Labuan RM79,000; However, starting from 2024 the new rate for the urban house repair programme is RM20,000 per unit throughout Malaysia and RM85,000 per unit for the urban new house building programme throughout Malaysia. For 2023, KPKT received an allocation of RM40.264 million for the urban house repair programme and RM2 million for the urban new house building programme, and the breakdown of beneficiaries by race is as follows. For
the Malay community, the number of household heads who received it was 1,875 persons. For Chinese, eight persons, Indians including Indian Muslims and Sikhs 67, others 545. Total overall 2,495. For new house building, Malays 19, Chinese three, Indians including Indian Muslims and Sikhs one, others four. Total 27. The search and identification of household heads (KIR) among the urban poor community for the provision of this aid is carried out by local authorities (PBT) as implementing agencies that are close to the people. The government hopes these efforts will help the B40 group in urban areas live comfortably and thereby improve their quality of life. That concludes my reply, thank you Deputy Speaker.
Supplementary question from Honourable Maran.
Thank you, Dato' Mr Speaker. Thank you, Deputy Minister. In our country, we have three categories of new villages. The first is the new village, the second is the network new village. These network new villages are on the outskirts of the city. Perhaps this area is also involved with the PBT areas. I would like to ask whether assistance for repairing and also building new houses has included the Chinese new villages? Because from what I see, the number is rather small compared with other races. Even the Indians are fewer. So, I ask one more thing: who is responsible for implementing the repair, rehabilitation and also new construction projects? Are they PRIMA or SPNB? I only mention this because these bodies are under the ministry or district offices and other agencies involved?
Thank you.
The Honourable Minister.
Thank you, Dato' Deputy Speaker. Thank you to the Honourable Member. To answer that question, what was mentioned earlier is indeed under the operation of the PBT. The areas to which we have channelled the allocation just now were indeed channelled through the PBT.
[Bangun]
For the year 2024, as mentioned just now, in terms of the total, that is the number we are able to help. However, for the allocation for the year 2024, there has indeed been an increase. For house repairs, we have increased it to RM35.84 million, and new house construction to RM14.96 million. The total has now risen to RM50.8 million. As for the question of implementing agencies, as a former, I am sure the Honourable Member is aware that under the Ministry of Housing and Local Government (KPKT), the focus is on the local authorities (PBT). Meanwhile, for those in rural areas mentioned just now, it falls under Rural and Regional Development. As for the implementation of the programme mentioned just now, although I have provided the breakdown by race, that occurs after the distribution. That means we do not distribute by race. However, because the Honourable Member's question asked for the breakdown by race, we checked the data obtained. But in terms of distribution, I am sure Dato' Deputy Speaker understands that the way we channel the allocation is not solely according to community groups, but also according to locality. Hence, we have JAKOA, we have MITRA, and we have the new village allocation. Therefore, the government's intention is to prevent any group within a certain framework from being left out in receiving assistance for those who are eligible. However, regarding the last question on implementers, for the current house repair and new construction programme, priority is given to the PBT, and so far it has indeed been under the PBT. However, we have also received feedback that some PBTs lack capacity, perhaps in terms of manpower constraints for monitoring and so on. Therefore, for next year, if there are applications at the PBT but the PBT is unable to carry them out, then in such cases we have requested and also discussed for SPNB to become the implementing group, should there be a need. Thank you, Deputy Dato' Mr Speaker.
The Honourable Batu Pahat.
Thank you, Dato' Mr Speaker. My supplementary question to the Deputy Minister is: what policy has the government adopted to ensure that poor urban residents are able to have homes in urban areas?
Thank you, Dato' Deputy Speaker. Thank you, Batu Pahat. At present, for the housing construction programme under the government for the B40 group, the most widespread construction is the People's Housing Programme, called PPR. That focuses more on how we provide housing in a project that can accommodate more residents there. However, the method we implement, as has been explained before, for PPR applications, priority is given according to what is raised by the state government. Therefore, I take note, for example in Johor, Batu Pahat may have a need to provide more houses to those who need them. So, that matter must be discussed to be raised to the state government. Secondly, when there is what was mentioned just now, such as the programme for repair and also new construction under PAKB, this is focused on the group registered under e-Kasih. These are indeed the ones who are very much in need. Therefore, we take note when there are incidents that need to be expedited or certain specific cases. Hence, that is why the government, under the Eleventh Malaysia Plan (RMKe-11), introduced this policy so that it does not depend solely on PPR, so that we can resolve these specific cases more quickly. Thank you, Deputy Speaker.
Thank you, the Honourable Minister. Next....
Dato' Speaker, Dato' Speaker, I seek the guidance of Dato' Speaker on Standing Order 24(1). Just now Dato' Speaker postponed the answer to question number 3. I only wish to seek guidance because according to 24(1), when that question comes up, the Member concerned must stand and ask, and any Minister may answer the question. So, is Dato' Speaker applying 24(1), or which Standing Order? Thank you, Dato' Speaker. I seek guidance.
The Honourable Alor Setar. Read 43, read 99, read 99A, read 100, and relate them. In the end, it is at the discretion of the Chairman, the person sitting here. That is the answer.
[Dewan riuh]
Good. Let us proceed, let us proceed to question number five. I invite Tuan Haji Ahmad Johnie bin Zawawi, the Honourable Igan.
Thank you, Deputy Dato' Mr Speaker. Igan's question number five.
5. Tuan Haji Ahmad Johnie bin Zawawi [Igan] asks the Prime Minister to state the matters in the Malaysia Agreement 1963 relating to Sarawak that have been finalised, and what other matters have yet to be resolved. State in detail.
Thank you, Dato' Mr Speaker. Thank you to my friend, the Honourable Igan, who is looking very handsome this morning.
Please proceed, the Honourable Member.
A question from Sarawak, answered by a Sarawakian too. For the information of my friend the Honourable Igan, the government remains committed to ensuring that the matters enshrined in the Malaysia Agreement 1963 are resolved within the legal framework, Honourable Member. In line with this, the Federal Government has decided that the consultation platform on MA63 be continued and enhanced into the Malaysia Agreement 63 Implementation Action Council (MTP-MA63), chaired personally by the Right Honourable Prime Minister. Apart from that, a technical committee chaired by the Right Honourable Deputy Prime Minister and Minister of Plantation and Commodities, as well as a coordinating committee chaired by the Honourable Minister (Sabah and Sarawak Affairs), have also been established under the Malaysia Agreement 63 Implementation Action Council. For the information of my friend the Honourable Member from Igan, discussions on the basic claims of MA63 are still ongoing, particularly those involving the state of Sarawak. The latest progress, Honourable Member, in those discussions is as follows: Six basic claims have been fully resolved. (a) The transfer of regulatory control over LPG to the Sarawak State Government. (b) Amendments to the Federal Constitution Article 1(2) and Article 160(2) of the Federal Constitution. (c) The granting of empowerment regarding licensing and deep-sea fishing to the two state governments, the state of Sabah and the state of Sarawak. (d) The recognition of the Public Works Department (JKR) and the Drainage and Irrigation Department (JPS) of the state of Sabah as well as the state of Sarawak as technical departments under Treasury Instruction (AP) 182. (e) The administration of the judiciary in Sarawak and in Sabah. (f) Amendments to the Inland Revenue Board of Malaysia Act 1995 [Act 533] to appoint representatives of the Sabah State Government and the Sarawak State Government as permanent members of the Inland Revenue Board. Second, partially resolved or on an interim basis, namely two basic claims, Honourable Member. (a) Review of the special grant for the state of Sabah and the state of Sarawak under Article 112D, namely RM300 million; and also (b) options for the guidelines on the return of reserved land for the purposes of the Federation and the states of Sabah and Sarawak as well, Honourable Member. A little more, Speaker. Third, policy decisions have been made. We have three basic claims as well: (a) The granting of empowerment regarding the environment. (b) Labour in the state of Sabah and the state of Sarawak; and (c) Powers regarding the appointment of the Judicial Commissioner, amendment of the Federal Constitution. There are still many. Can I continue? Thank you, Honourable Member. Fourth, in the discussion of 12 matters. (a) The issue of oil royalties and cash payments for petroleum. (b) Oil minerals and oil fields. (c) Territorial Sea Act 2012 [Act 750].
(d) State rights over the continental shelf. (e) Federal financial obligations under List Three, Concurrent List of the Ninth Schedule to the Federal Constitution. (f) Stamp duty imposed on instruments of transfer of land rent charges under the Sabah Land Ordinance (Cap. 68) and the Sarawak Land Code (Cap. 81). (g) Increase in public service posts of the state of Sabah and Sarawak under Article 112 of the Federal Constitution. (h) Borneonisation of the federal public service in the states of Sabah and Sarawak. (i) Development of the Sabah, Sarawak and Kalimantan border. (j) Increase in the number of Members of Parliament from the states of Sabah and Sarawak in the Dewan Rakyat. (k) Proposed amendment to Article 95B of the Federal Constitution regarding adjustments for the states of Sabah and Sarawak concerning the division of legislative powers; and (l) Proposed item 25A tourism and the Federal List Ninth Schedule of the Federal Constitution to List Three, Concurrent List of the Ninth Schedule of the Federal Constitution. Honourable Member, thank you.
Supplementary question, the Honourable Igan?
Thank you, Dato' Deputy Mr Speaker. Before Igan asks a supplementary question, Igan wishes to convey a pantun that is very close to the hearts of the people of Sarawak, composed by the late Tok Nan, who is synonymous with the struggle to claim the rights contained in the Malaysia Agreement 1963.
Nyiur gading puncak mahligai, Sayang ketupat berisi inti, Hancur badan tulang berkecai, Belum dapat, belum berhenti.
[Applause] Honourable Deputy Minister, earlier I listened carefully to the answer given, which was very detailed, and I am sure the people of Sarawak...
Hidup Igan.
...are very happy to hear the answer given. This is like the assurance given by the Right Honourable Prime Minister that the Malaysia Agreement 1963 is no longer to be discussed but to be implemented. [Applause] Honourable Deputy Minister, apart from the lists mentioned just now, does the government accept other new issues, because the Malaysia Agreement 1963 is a technical matter, which is not well understood by the general public. I ask that the Honourable Deputy Minister be able to elaborate on any latest developments being discussed at the federal level. Thank you, Dato' Mr Speaker.
The Honourable Minister.
Thank you, my friend Igan. A pantun that is truly encouraging to the hearts of Sarawakians, Igan. Okay, thank you, Igan. Thank you, Dato' Mr Speaker. The Federal Government has also received three more new issues that we will discuss. One, autonomy in education. Second, autonomy in health, and the third, Igan, is the change in status of Bintulu Port from a Federal Port to a Sarawak State Port. These issues have already been presented by the Sabah State Government and the Sarawak State Government, Semporna [referring to the Honourable Semporna], at the Technical Committee meeting under MTP-MA63 held on 18 July 2023. For the information of the Honourable Members, the MA63 Coordination Meeting on the development of education and health in the states of Sabah and Sarawak, co-chaired by the Honourable Minister of Education and the Honourable Minister of Health, was also held on 28 August 2023, a few months ago. The timeframe for resolving each matter or claim is subject to the relevant legislative process. Apart from that, the readiness of the Sabah and Sarawak State Governments in terms of their operations, human resources and finances is also an aspect that must be taken into account before a matter or basic claim of MA63 is resolved. On 26 August last year, the MA63 Technical Committee, chaired by the Honourable Igan, the Right Honourable Deputy Prime Minister, together with the State Ministry of Education and the Ministry of Education Malaysia, deliberated on the power of autonomy in education between Malaysia and the state of Sarawak so that this matter will be brought to MTP-MA63 to be agreed upon, chaired by our Right Honourable Prime Minister. I think I have answered very clearly and plainly for the people of the state of Sarawak. Thank you, Igan.
For— press, press. Give it to the Honourable Tumpat. The Honourable Kapar has already had two people ask earlier. The Honourable Tumpat.
[Laughter] Give it to Sabah.
It's all right, give it to Sabah then. Sabah. I'll give it to Sabah. I step back for Sabah. Sabah also asked. [Applause]
More important than us.
It's all right, it's all right, it's all right.
You see, we are friends too.
[Dewan riuh]
No, although it is the Speaker's right to decide on a matter, I respect that. However, sometimes it is important for us to adjust the circumstances of the question, so that it arises, because we want to hear the voice of the people. [Applause] I am a people's representative, the voice of the people, so I am asking my colleague, the Honourable Deputy Minister of Hulu Rajang. Thank you very much for the answer explained about Agreement 63. I still remember in 2019 when I was Chief Minister, of the 21 matters we discussed in 2019, 17 had been agreed upon but implementation has not yet happened. Some of them have been implemented, not many, and this is what I want to raise. If we look, Dato' Speaker, the agreement forming Malaysia touches the conscience of the Malaysian people in Sabah and Sarawak.
We wanted to build a nation. This is what I say— bind their souls, and thus Malaysia was formed. Souls bound because it was in line with what they wanted, but it has been 60 years. When will this agreement be fulfilled, including what is enshrined in it, first, ICJ? Datuk mentioned just now several ICJ lists. Federal List Article 92 of the Constitution, 92(c)— which we listed there, autonomy, which education and health are not new matters, that was in the 1960s. This is not a new demand, it was raised long ago by our Malaysian founding fathers. That is their bond. When? Sometimes I hear the Right Honourable Prime Minister and the Honourable Minister of Sabah Affairs say it is being negotiated. 60 years, Dato' Speaker, when will this matter be implemented? Thank you.
Thank you, Semporna. Semporna is indeed knowledgeable and diligent and also really pays attention to the people of Sabah. As— I am also a citizen of the state of Sarawak, Semporna. That is a fact, yes, and our political instability in 2019, Semporna and everyone wanted to know at that time. So, I believe Semporna, with the establishment of BHESS, the Sabah and Sarawak Affairs Division, and also the council chaired personally, by the Right Honourable Prime Minister himself, and now the Technical Council as well as the Technical Committee chaired by the Right Honourable Deputy Prime Minister from the state of Sarawak. This means Sabah and Sarawak are bound in my heart, Honourable Member. So, I believe whatever has been informed to me just now, I will bring again, and it is heard for the people of Sabah and Sarawak. Let us leave it as in the pantun of the Honourable Igan just now, Semporna. I continue with determination, I continue with an open heart to work together with the Minister, with the Minister of Sabah and the Deputy Minister of Sarawak, and together we must push through and pass this. Implement it, stop negotiating this matter, Honourable Member. Thank you. [Applause]
Alhamdulillah, that is the spirit among Members of Parliament. Alhamdulillah, just now, although they went from the left to the right side again, this is for the sake of the nation, yes. [Applause] Good, I will return to question number three. I invite Dato' Ngeh Koo Ham, the Honourable Beruas.
Thank you, Dato' Deputy Speaker, my question, question number 3.
3. Dato' Ngeh Koo Ham [Beruas] asks the Minister of Foreign Affairs to state what action has been taken and will be taken to resolve the complaints of Malaysian fishermen that their boats were arrested by Indonesian enforcement agencies when their boats were still in Malaysian waters or in waters overlapping with Indonesia?
Tuan Yang di-Pertua, I thank the Honourable Beruas for the question raised. For the information of this august House, Malaysia's foreign policy always adheres to the concept that prioritises national sovereignty and interests. The Malaysian Government, through the relevant agencies and enforcement agencies, constantly monitors and surveils the nation's waters to ensure they are not violated by foreign enforcement agencies and to protect the interests of Malaysian fishermen. Actions taken include patrols, surveillance and enforcement carried out continuously to ensure that the sovereignty, sovereign rights and interests of the nation are always safeguarded. The Ministry of Foreign Affairs, together with relevant agencies such as the National Security Council (MKN), the Malaysian Maritime Enforcement Agency (APMM) and the Royal Malaysian Navy (TLDM)
is always committed and gives special attention to security in the country's maritime waters. The Ministry of Foreign Affairs also uses existing bilateral platforms to raise this matter and to request the cooperation of the relevant foreign governments to ensure that foreign enforcement agencies do not intrude into the country's waters. In this regard, the existing mechanism between Malaysia and Indonesia on the treatment of fishermen from both countries who enter the disputed areas is, with permission, under the "review meeting on the implementation of the MoU between the Government of Malaysia and the Government of the Republic of Indonesia in respect of the Common Guidelines Concerning Treatment of Fishermen for Maritime Law Enforcement Agencies of Malaysia and the Republic of Indonesia". Thank you.
Alright, supplementary question.
Thank you, Dato' Deputy Speaker. My supplementary question is this: when Indonesian enforcement officers want to arrest and take our fishing vessels or boats into Indonesian waters, it is an urgent situation, and our fishermen need to contact the Malaysian authorities immediately. Now, we have four enforcement agencies: the marine police, the fisheries department, the Malaysian Maritime Enforcement Agency and also the Royal Malaysian Navy. In that urgent situation, before they are taken into Indonesian waters, which agency should we contact for immediate action? For ordinary people, it is difficult — if it is the Royal Malaysian Navy (TLDM) that is responsible, it is difficult for ordinary people to contact the TLDM. My question is whether there is an internal mechanism or internal arrangement by which any of these enforcement agencies can be contacted immediately, and we can convey the latest information to the authorities protecting our borders for immediate action?
Thank you for the supplementary question. Since Beruas is from the Manjung area, and I am from Lumut but the Member of Parliament for Lumut is someone else. We often discuss this matter. If Beruas still remembers, when I was Menteri Besar, this matter was also raised repeatedly. How do we solve the problems faced? Because our area does share a border with areas on the Indonesian side, especially the Pulau Jarak area. Well, there are two mechanisms being implemented. The first is through an approach at the national level, where the body responsible is the MKN and, on the Indonesian side, the one called the Maritime Security Agency (Bakamla). So, both these agencies represent their respective countries in efforts to find solutions, including within the context of the MoU I mentioned earlier. The last time they held this discussion to resolve the problem of overlapping areas was in 2021, that is the first one. The second, areas involving especially the West Coast, and we know these incidents often happen, including in the Hutan Melintang area, the Kuala Selangor area and so on. We use an approach, if the Honourable Member still remembers, which is the creative approach taken by the TLDM in introducing a system, a device placed on each fishing boat. The challenge for us, however, is how to convince fishermen to accept the monitoring device placed on their boats.
This is very important because whenever these incidents occur, it means they can convey information directly to the TLDM, and this has already been implemented. I hope our fishermen will cooperate with the TLDM to install the alarm devices that have been produced all this time.
Honourable Member, supplementary question.
Explanation. But from complaints, sometimes the data conveyed by our fishermen...
Yang Berhormat.
Hari ini...
Honourable Beruas, sit down.
Penjelasan.
Sudah, cukup.
...is not accepted by the Indonesian side. That is their problem.
Ya.
Supplementary question. [Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding
Today three have come, to give help. Just now, question number 3, when it's time, where to, sir. Ha, never mind, that's number two. [Laughter] My question, Honourable Member, is that just now you mentioned disputed areas. In disputed areas there are our fishermen who have been arrested. Honourable Member, you once, let me first say, I once went to bail out two fishermen from Kuala Selangor so they could be brought back after they were sentenced to prison, brought back here, and when we look back, they had been arrested in a disputed area. I would like to know, have we taken any action to protest? Secondly, this is a disputed area, but this is Malaysian territory where foreign vessels are prohibited from arresting people. There is a foreign vessel stationed 80 nautical miles from Sarawak. Our EEZ boundary is 200 nautical miles. These are 80 nautical miles; fishermen from Bintulu and others who wanted to fish in that area were chased away, told that this is Chinese territory. So, I want to ask what firm action the government has taken? Because the TLDM ship and also the APMM ship stationed there are 20 kilometres from Beting Patinggi Ali, while the Chinese ship is three kilometres away.
Ringkaskan soalan.
So, they have been prohibited — local fishermen have been prevented from fishing. This has happened 1,000 times already, Honourable Member, not once. I ask for firm action. Secondly, I would like to suggest, Honourable Member, that you go to Beting Patinggi Ali at least once in your lifetime. Even if you go there, there is no helipad; you circle for half an hour and then turn back, so make sure you have enough fuel, okay. But look at Beting Patinggi Ali and see that our area is being intruded upon. Thank you.
Thank you. I have been there before, but before becoming Foreign Minister, and I have visited several areas, and God willing I will go there. As Arau is well aware, Arau once managed one of those important agencies. So, if he speaks
about 1,000 times, it means I have only been once, the others were him handling such problems. To answer the first question, just now it was asked where my pantun was, but perhaps there is some confusion in the House because the question sent for this MQ was not — not from the Minister of Foreign Affairs, it should have been from another Minister. So, however — nevertheless I have still come after we corrected the minor error in the record of this. Okay, as Arau is also well aware, in terms of this relationship it must continue, yes. Discussions must continue, protest notes are a common matter, a practice carried out in the context of diplomacy. In this regard, the most important thing is for us to place ourselves where we truly stand, and we cannot compromise on these matters of sovereignty. From intrusions not only in the context of China, but we are also aware of Sabah and Sarawak from the Philippines, from Vietnam, among the biggest issues, and these are among the matters discussed in bilateral relations between the countries involved. We will continue this monitoring, and thank you for the suggestion that I go and see, and I will go and see. No problem. Thank you.
Honourable Member, these bilateral negotiations have been held many times.
I invite Tuan Fathul Huzir bin Ayob, Member of Parliament for Gerik.
Cuba buat...
Arau, duduk.
I want to say something briefly. Not allowed? Sit down. Honourable Member?
Duduk.
Ha, sit down, okay.
Gerik.
Not too many times.
Thank you, Deputy Speaker. My question number six.
6. Tuan Fathul Huzir bin Ayob [Gerik] asks the Minister of Youth and Sports to state the proposal to build a professional archery sports facility in the Pengkalan Hulu district, given that the Hulu Perak district once produced more than 10 national archery athletes.
Deputy Minister, please.
Alright. The question from Gerik asks that the Ministry of Youth and Sports state the proposal to build a professional archery sports facility in the Pengkalan Hulu District. Actually, Mr Speaker, this is more a proposal than a question. Nevertheless, the Ministry of Youth and Sports always gives priority to the development of sports facilities based on the needs of each area, so that we can achieve the aim of cultivating sports and a healthy lifestyle among the community, as well as the development of sports at the grassroots level. As has been stated repeatedly in this House, any proposal or application for the construction of any sports facility must first take into account the aspect of allocation, there must be careful planning and it must also be based on the stipulated conditions. So, for now, the ministry is focusing on upgrading existing sports facilities. Therefore, for the information of the Honourable Member for Gerik especially, the Ministry of Youth and Sports always gives consideration to the construction of any sports facility, including professional archery whether in the Pengkalan Hulu District or in any other place, subject to what I have just said and also must focus on the availability of site status, utilisation rate and location. In other words, before we take up any application, including if it is to be brought into this House, we must first ensure that there is approval from the State Executive Council or from the local authority regarding site availability. If we do not have a site, we do not have a place to build a sports facility, that must be obtained first, and only then bring it to the Ministry of Youth and Sports. This is also in line with the guidelines for the preparation of the 2023 Federal Expenditure Estimates and also the Guidelines for the Preparation of the Twelfth Malaysia Plan. In terms of archery, for the information of Mr Speaker and also the Honourable Member for Gerik, in the state of Perak, for example, we have a training centre that was built, or a state training centre housed at Sultan Idris University of Education in Tanjong Malim, involving 10 athletes and also one part-time coach. We know that archery sometimes does not require the construction of a new facility. Instead, it can be adopted or held at any suitable place with an open area and a coach. Sometimes that is already sufficient. That is why archery in our country, whether archery that takes part in major championships or traditional archery, is very — people say very successful, because the need for them to hold training is actually very minimal. Thank you.
first look at the allocation aspect. There must be careful planning, and it must also be based on the prescribed requirements. So, for now, the ministry is focusing on upgrading existing sports facilities. Therefore, for the information of the Honourable Member for Gerik in particular, the Ministry of Youth and Sports always gives consideration to the construction of any sports facility, including professional archery, whether in the Pengkalan Hulu District or anywhere else, subject to what I have just mentioned. We must also focus on the availability of site status, the utilisation rate and the location. In other words, before we table any application, including if it is to be brought into this House, we must first ensure that it has already received approval from the State Executive Council or from the local authority regarding the availability of the site. If we do not have a site, we have no place to build a sports facility, so that must be obtained first, and only then be brought to the Ministry of Youth and Sports. This is also in line with the guidelines for the preparation of the Federal Budget Estimates 2023 and the Guidelines for the Preparation of the Twelfth Malaysia Plan. On the matter of archery sports, for the information of Mr Speaker and also the Member of Parliament for Gerik, in the state of Perak, for example, we have a training centre that has been built, or a state training centre located at Sultan Idris University of Education in Tanjong Malim, involving 10 athletes and one part-time coach. We know that for archery, sometimes it does not require the construction of a new facility. Instead, it can adopt or be held at a suitable location, where there is an open area and a coach. Sometimes that is already sufficient. That is why archery in our country, whether archery that takes part in major championships or traditional archery, is very successful, as people say, because the requirement for them to hold training is in fact very minimal. Thank you.
Gerik, supplementary question.
Thank you for the Deputy Minister's answer. My question actually concerns Pengkalan Hulu, because we have in fact produced more than 10 athletes from archery. So, we — professional athletes, yes, and they have brought honour to the country. So, we — since it is no longer in that area, its development, so we no longer have our representative from there for the state of Perak, but never mind. For my supplementary question, I would like to ask the Deputy Minister, can KBS, in cooperation with the Ministry of Education, propose to make archery one of the sports that is either compulsory or established in schools, because it is very good for focusing on our children who are studying, and it is even the Sunnah of the Prophet SAW. Then it can also discover new talents. Secondly, is there any special allocation in an effort to encourage private archery industry operators throughout Malaysia, of which there are already many? Is there any special allocation from the ministry concerned for this matter? Thank you.
Thank you. I consider the question from Gerik to be indeed a matter of concern. What I mean is that in the Members of Parliament's own areas, we can indeed see that each Member of Parliament, when raising questions related to these specific sports, there is focus and also a form of support for sports activists at the level of their respective areas.
This is a culture that we indeed encourage, which is why, although the questions are asked repeatedly in the House, we still take them up and answer them, so that we state that we also want every person to be given attention. As for the question of the Honourable Member for Gerik, the first, regarding cooperation with the KPM, we do have what we call a high-level committee, that is a committee at the highest level to see how every school or agency or other ministries can also provide cooperation in ensuring that any sports activity or any sports programme can be developed cross-ministry. Certainly the KPM is one of the most important stakeholders, because we want to see these sports talents nurtured at the school level from the beginning. Archery is one of the sports we focus on because it has already recorded many successes at the international level, whether those in — as I mentioned, major championships, SEA Games, Asian Games or the Olympics. Also traditional archery, which this year alone our country has, in open championships, recorded successes as champions in many, including the Fetih Kupasi in Turkey, which is one of the major archery championships. This is in other words that we always engage with every relevant sports body. The second question, which is related to allocation — is that right, Gerik? Allocations are always made. The important thing is that it must be channelled to registered sports bodies or associations. If with — private academies that are profit-based, we will discuss so that any form of support or assistance, for example financial, can be channelled to the bodies and associations connected with them. It must be used not mainly, perhaps, to upgrade the equipment used by the academy, but rather to help these athletes, whether in their wish to take part in international championships or to help training sessions before they take part in any championship. That is how we help at the level of associations and also these sports activists. Thank you.
Bentong.
Thank you, Madam Speaker. Honourable Deputy Minister, I would like to ask, does the ministry have a target, or does the government have a target, regarding sports facilities that can be rehabilitated throughout the country, or only if each Parliament submits applications and so on. Secondly, what are the government's steps to strengthen cooperation with state sports councils to reduce dependence on the National Sports Council in identifying new talents and giving opportunities to new sports that may have better potential. Thank you.
Thank you, Honourable Bentong. The first question relates to sports facilities. Our target this year is, at least through — the winding-up recently has already been stated, more than 100 rehabilitation works and upgrading of sports facilities, sports amenities, we will carry out. At the same time, we also always receive any applications made by any local authority, district council or sports associations, or Honourable Members and state governments. Second, in terms of — the second question just now?
On how we will ensure the state MSN's dependence on the national MSN.
Alright. The MSN, the state sports council, usually focuses on the development of athletes or sports talent at the state level, meaning they usually supervise any championship journeys or the identification of talent at district levels. Then the MSN, or the National Sports Council, aims to be a major hub or umbrella for development, especially for athletes who represent the country. The way of cooperation between the state sports council and the National Sports Council is that the state sports council usually becomes the base or place for us to identify talent before we push them or give them a way to be absorbed into the National Sports Council programmes. Cooperation is usually carried out G2G, government to government. In other words, the Ministry of Youth and Sports always holds discussions with the sports Exco members in their respective states on how we can more or less launch a pipeline for these athletes, the development of programmes that people say are more uniform, and also identifying where the weaknesses are that can be helped, whether at the national or state level. This cooperation is not limited only when there are championships; from time to time we will also hold close discussions, not only at ministry level but at the level of the sports council itself. That is the way of cooperation so far. We do not feel burdened, because there must indeed be close cooperation at all times.
I invite Tuan Chiew Choon Man, Miri.
Thank you, Madam Speaker. At the request of Madam Kluang, I would like to welcome the arrival of students from Kluang Vocational School who have come to visit Parliament today. My question is number 7.
7. Mr Chiew Choon Man [Miri] asks the Minister of Local Government Development to state the number of households living in squatter housing in Miri city and the ministry's measures, in cooperation with the Sarawak state government, to address the very serious squatter housing problem in Miri City.
Silakan Menteri.
Madam Speaker, for the information of Madam Speaker and the Honourable Members, based on the records of the Sarawak Ministry of Public Health, Housing and Local Government (KKTP), there are 1,741 household heads with 9,462 family members living in squatter housing in Miri city. To assist the B40 group, two programmes are being implemented by the Ministry of Local Government Development (KPKT) in Sarawak, particularly in Miri city. The first is the People's Housing Programme (Program Perumahan Rakyat, PPR). KPKT builds PPR to meet the needs of the B40 group. A total of 12 projects comprising 4,791 housing units have been completed, one project comprising 461 housing units is under construction, and one project with 200 units is in planning across Sarawak. Near Miri, there is one PPR owned, namely PPR Lambir, which has been completed with 505 units. Second is the People-Friendly Housing Programme (Program Rumah Mesra Rakyat, RMR). This programme is implemented by National Housing Company Berhad (SPNB) and can benefit B40 groups who own land or land belonging to family members with approval. To date, 2,217 RMR units have been completed and 95 units are under construction. In Miri, 50 RMR units have been completed and one unit is under construction. Overall, a total of 7,008 houses have been completed, which have benefited approximately 28,000 occupants. KPKT will continue
cooperation with the Sarawak State Government to improve people's access to quality and affordable housing. Thank you, Madam Speaker.
Miri.
Thank you, Deputy Minister. What other types of assistance can a poor person in Miri apply for from the government to help them obtain housing, apart from what was stated by the Minister? Does the Deputy Minister agree that high-rise development, with permission, such as flats, apartments and multi-storey townhouses, is a solution to meet the growing housing needs in Miri arising from development?
Thank you, Madam Speaker, and thank you to the Honourable Member for Miri. As I explained in the earlier question, for PPR projects, if there is a need in Miri, the matter must be agreed upon and raised by the state government. Therefore, on that matter, I indeed – on KPKT's part, we have indeed opened the door to state governments that prioritise providing land free of charge or at a nominal payment.
Second, regarding applications for RMR housing, perhaps I can share a little about the method, namely that the applicant must have a monthly income of RM5,000 or below, and own land or family land that has received approval. It is open to Malaysian citizens regardless of race, and they must be 18 years of age or above. The price of an RMR is starting from RM75,000. So, to assist the B40 group, for each RMR, the government provides a subsidy of RM20,000. The remainder must be borne by the applicant. In addition, for applicants aged not more than 42 years, including young people, they do not need to fulfil the additional requirement of providing a second nominee to apply for RMR. Then, for those I also explained in the earlier question, namely for new construction or refurbishment of houses under the Urban Poverty Eradication Programme, the list of applicants must indeed be on the eKasih list. So, if the Honourable Member does find such cases and has identified them in terms of land requirements and so on, that can be done through the method with the local authority (PBT), and if follow-up is needed, my own office can also look into it if such cases occur. Thank you, Madam Speaker.
Kuantan.
Thank you, Speaker. So, I would like to ask the Deputy Minister about the status of achievement of the Civic Awareness Course implemented across all People's Housing Programme (PPR) projects and what is the status of the Zero Squatter Programme in each state. My second question is, in efforts toward creating zero-squatter cities, particularly in the major cities across the country, does the government intend to relocate squatter residents in these urban areas to rural areas where the population capacity is still categorised as less dense? Thank you.
Thank you, Madam Speaker, and thank you to the Honourable Member for Kuantan, who often asks questions of KPKT. Thank you very much. Regarding the Civic Awareness Course for PPR residents, that is a proposal announced by the Honourable Minister this year, for the new PPRs that we are planning. So, as for the status of implementation, the matter has indeed not yet taken place in terms of construction; it is still at the planning stage. As for the matter relating to the problem faced, namely the issue of squatters, as in my answer to Miri earlier, squatter information is indeed under the state government. This is because when squatters are mentioned, for example there are squatters living in areas considered government land or private land. So, the problem of squatters is indeed a burden faced by the state government, and that is why, when we receive applications for the construction of PPR programmes, one of the aims conveyed by the state government is usually or customarily to overcome the squatter problem. Therefore, in terms of symbiotic cooperation between the Federal Government and the state government, there must be a way so that when we implement the PPR programme, directly or indirectly, we help the state government manage squatter housing issues. Finally, regarding the Honourable Member's proposal, I will only take note of it because it involves policy matters, and how – because at KPKT level, under PLANMalaysia, we indeed find a trend of population increase in cities or big towns, and by 2040 that will reach nearly 75 per cent of the population living in urban areas. So, this is among the demographic issues that may be a good discussion for us to hold. Thank you, Madam Speaker.
under the state government. Because when setinggan is mentioned, for example, there are squatters living on land regarded as government land or private land. So the problem of squatters is indeed a burden faced by the state government, and therefore when we receive applications regarding the construction of the PPR Programme, one of the aims conveyed by the state government is usually or customarily to overcome the problem of squatters. Therefore, in terms of symbiotic cooperation between the Federal Government and the state government, there needs to be a arrangement so that when we implement the PPR Programme, whether directly or indirectly, it helps the state government manage the issues of squatter housing. Finally, regarding the Honourable Member's proposal, I will only take note, because it involves matters of policy and how our policy is... because the situation here, both at the level of the Ministry of Housing and Local Government (KPKT) and under PLANMalaysia, shows there is indeed a trend of increasing population in cities and major towns, and by 2040 this will reach nearly 75 per cent of the population living in urban areas. So, that is among the demographic issues that may be a good discussion for us to hold. Thank you, Madam Speaker.
I invite Tuan Kamal bin Ashaari, Kuala Krau.
Assalamualaikum warahmatullahi wabarakatuh. Hamas, Mujahidin Harapan, my question is number 8. [Applause]
8. Mr Kamal bin Ashaari [Kuala Krau] asks the Minister of Communications and Digital to state how long the ministry will need for internet access and telecommunications coverage in Kuala Krau to be improved, especially in interior areas such as Kerdau.
[Laughter] Thank you, Honourable Member. Madam Speaker, the continuous efforts of the Ministry of Communications and Digital (KKD) through the Malaysian Communications and Multimedia Commission (MCMC) under the National Digital Connectivity Plan (JENDELA) are being gradually expanded to ensure that people in rural and interior areas obtain quality internet access and communications coverage. Under the JENDELA plan, as of the third quarter of 2023 in the Kuala Krau Parliamentary constituency, two of six towers have been completed and are operational, namely at Kampung Perlok 2 and the FELDA Jengka 2 palm oil mill, and all 85 transmitter stations have been upgraded. Next, 3,917 out of 8,746 premises have been made available with fibre optic connection, and one location planned for broadband wireless access (BWA) services has been completed and is operational. As for the Kerdau area, two new towers, namely at Kampung Tanjong Dalulang and Kampung Telok Sabak, are currently in the process of implementation. In addition, all 23 transmitters have been completed and upgraded, and 293 out of 1,629 premises have been made available with fibre optic connection. Meanwhile, one broadband wireless access service location at the Orang Asli village of Paya Sendayan has been completed and is operational. The government is also implementing broadband infrastructure provision using the point of presence (PoP) fibre optic hub method. Overall, for the state of Pahang, as of 31 October 2023, a total of 39 out of 439 PoPs have been successfully completed. That is 39 in phase 1, meaning already finished. There are 400 more being planned in phase 2, making 4,120 premises available with fibre optic connection for subscription by local communities. Of
that total, 28 PoPs are located in areas near schools in the Kuala Krau Parliamentary constituency. With 5 PoPs for phase 1, while 23 PoPs for phase 2. The list of PoP locations is in a dossier prepared by MCMC. All the initiatives planned are expected to be completed and operational in phases by the end of 2025. Thank you.
Kuala Krau.
Thank you, Honourable Minister, for an answer that I think is encouraging for the people of Kuala Krau. Only, the Perlok and FELDA Jengka 2 palm oil mill are under the Maran Parliamentary constituency, not Kuala Krau. For the state of Pahang, I have been informed that 5G coverage is among the lowest of the states, the 4 lowest being under 50 per cent. What I want to emphasise here is why Pahang is rather left behind in terms of 5G achievement. Right now we are on par with Sarawak and Sabah, under 45 per cent. Thank you, Minister.
Thank you, Honourable Member. This is a very good question. Actually, this is among what I answered in the MQT question this morning. It involves issues relating to land, concerning local authorities, and perhaps some matters relating to electricity supply. But generally, in a series of meetings I have had with several, whether chief ministers or Menteri Besar, we bring them up and we will try to resolve them in bulk.
[Bangun]
[Bangun]
For example, I have just returned from an official working visit to Sabah and held a meeting with the Honourable Chief Minister of Sabah, and he himself gave an assurance that the problems in the state of Sabah, God willing, can be overcome. God willwilling, I will go to Pahang for an official visit and we will handle it at a micro level, yes, in fact. God willing, this evening...
Don't forget to invite Kuala Krau.
Alright, God willing. I would like to take this opportunity to inform the Honourable Member for Kuala Krau, who raised it in March and also recently in October, the recurring problem. I have received feedback and I have expressed my dissatisfaction to both parties, Celcom, DiGi and also MCMC. For the information of the Honourable Members, the problem we are facing at the moment is that the mandatory standards for quality of service (MSQoS) stipulate that mobile telecommunications service providers, or mobile network operators, only need to achieve a speed of 2.5 Mbps. This is a rate that is far too low, but that is the rate enshrined in the regulations at present.
So, God willing, MCMC is redrafting, and the problem raised by the Honourable Member is under review. This morning I also spoke with the CEO of Celcom, asking him to look into this problem. The issue is that they meet the MSQoS level, but that is still not sufficient. So, God willing, we will examine it. Also to any other Honourable Members, if there are specific problems, you may refer them to me so that we can resolve them together, God willing.
Ledang.
Thank you, Madam Deputy Speaker. I congratulate the Minister and also the ministry, because they have indeed put in very diligent effort to ensure connectivity and to narrow the digital divide in our country. I focus more on the issue of the use of USP funds, that is, the Tabung Perkhidmatan Sejagat, which we can mention. Because this is used for the purpose of JENDELA, the JENDELA project. What percentage has actually been allocated
for the JENDELA programme? What is the status of the use of these USP funds, and what action are we taking to ensure that service providers provide services within an appropriate timeframe, especially when towers have been installed but service providers do not provide complete equipment? So, that is the naked tower issue I mentioned earlier. Thank you.
Thank you, Honourable Member. Madam Speaker, I do not have specific figures on what the Honourable Member for Ledang requested, but God willing I will provide them in writing shortly. But what is clear at this time is why, when I was answering question number three in the MQT earlier, I explained that of the 1,661 towers that were planned under JENDELA, as the Honourable Member mentioned, using USP funds, the Universal Services Provision Fund. We find that of the 1,661 planned to be built and completed, 594 have been completed. However, only 141 are on-air. On-air means it has been functioning, yes. There is still a large number, 453, that are not yet. Of this number, for the information of the Honourable Member and also the House, there are 232 towers that are completed and waiting for microwave equipment installation. There are 196 waiting for fibre installation. This fibre will take more than nine months. So, when I visited Kampung Kelebang in Ulu Bernam, if I am not mistaken, near FELDA Soeharto, we found that the tower had been completed but was waiting nine months. The villagers said, there is already a tower, so why is there no line? So, I have instructed MCMC to change the procedure to ensure that all towers waiting for fibre are, in the meantime, equipped with microwave. Towers waiting for fibre take at least nine months, but microwave installation takes less than three months. So, God willing, 196 towers with 232 towers. So, we expect, God willing, starting within the next three months, God willing, 453 towers in the JENDELA programme will be on air. So, God willing, we will handle it better. Thank you.
Honourable Member, now the session for Question Time for Oral Answers today has ended. Thank you, Honourable Member. [End of the Question Time for Oral Answers session]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, "Under Standing Order 12(1), I humbly propose that today's sitting will not be adjourned until all ministries have completed replying to the debate on the Budget 2024 at the policy stage and the second reading of the Supply Bill 2024 and the Development Estimates Motion have been decided, and after that the sitting of the House will be adjourned until 10 am on Monday, 6 November 2023".
Siapa menyokong?
Madam Speaker, I humbly beg to support.
Honourable Members, I now put the question to the House to be decided. The question is that the motion as moved just now be agreed to.
[Motion put for decision; and agreed to]
Honourable Member, Standing Order 18(1). 18(1). Can I?
Honourable Member for Arau, there is no need to read it, as the decision of Tan Sri Speaker has already been given to the Honourable Member for Arau.
Okay 18(1), Honourable Member. Okay, okay. Right, I want to inform you of this: 18(1), the first is the Palestine Solidarity Week, the second is a statement from Teluk Intan. I have brought it up, and the Speaker has said here that the Minister of Education will make the winding-up on this day. So, I remind the Minister of Education that he must mention it. Why? The Speaker has already said so. That is why I stood up, so it is not wrong.
So, please sit down.
Second, Honourable Member, the second is that I have brought up 18(1), 18(2). The Honourable Speaker has given an answer that it has been answered by Tebrau on that day, namely that he denied that he supports Israel.
Honourable Member for Arau.
But here he liked Gal Gadot. All Malaysians know, he liked Gal Gadot and then he unliked...
Honourable Member for Arau, do not waste time.
He unliked, but we were able to do that – got...
Screenshot.
...a screenshot. So, we were able to prove that he liked it. So, this case is not resolved. In other words, when we have confused...
Not resolved. Arau, meet Tan Sri Speaker later. Do not waste time in the House. The Minister is waiting.
Yes, yes. With that, I will bring it up. Yes, I have brought it up. Honourable Member, I have brought it up under 36(15) and close to the Speaker, 36(15).
Honourable Member, the Minister is waiting to give the answer.
I have already given time, Arau..
Do not waste time, Arau. Please sit down. Honourable Members...
Yang Berhormat...
Bill — Supply Bill 2024 Second Reading and Development Estimates Motion 2024Bill
The Order of the Day was read to resume the debate on the postponed question, "That the Appropriation Bill 2024 be now read a second time" and "That the following Motion be referred to the Committee of the whole House". "That this House, pursuant to subsection 4(3) of the Development Fund Act 1966 [Act 406], resolves that a sum of not more than ninety-two billion Ringgit (RM92,000,000,000) be expended from the Development Fund for the year 2024, and for the purposes and particulars of Development Expenditure stated under the Development Purpose or ("P") in the list of Federal Estimates of Expenditure 2024, presented as Command Paper 34 of 2023, be allocated under the relevant Purposes the sums opposite those particulars in columns six and seven of the said list". [1 November 2023]
Honourable Members, before I begin the Minister's reply session for the budget debate at the policy level, I wish to inform you that there is a change in the order of ministries replying today. Now, the Ministry of Human Resources will wind up at number two, after the Ministry of Transport, and then followed by the Ministry of Education. Thank you. I invite the Honourable Minister of Transport to reply.
Thank you, Madam Speaker. Allow me to record my highest appreciation for the concern shown by 37 Honourable Members towards the Ministry of Transport (MOT), who debated and touched on matters under the MOT's purview. Madam Speaker, I shall begin with the land sector, followed by the maritime sector and then the air sector. I begin my reply to the issues raised by the Honourable Members for Larut, Puncak Borneo, Lubok Antu, Kalabakan, Lawas and Sipitang concerning the Trans Borneo railway alignment. The Government is currently studying projects that will prepare the transport sector to face the spillover of economic activity that will arise from the development of Indonesia's new capital city in Kalimantan. To support this need, a feasibility study for the Trans Borneo railway line has been applied for by this ministry, and the study will be carried out next year. The alignment can improve connectivity and boost logistics activities related to the development of Indonesia's new capital, Nusantara, located in East Kalimantan. In line with the planned Kalimantan railway network by the Indonesian government at present, the Trans Borneo railway network will become a complement to enable the movement of goods and passengers throughout the islands of Borneo. Regarding public transport in Sabah and Sarawak, this ministry, through LPKP Sabah and LPKP Sarawak (Commercial Vehicles Licensing Board), is restructuring public bus transport by introducing more comfortable and systematic buses through the Stop-and-Go Bus Transformation Expansion Programme (SBST) in Kota Kinabalu and Kuching. Through this programme, a scheduled and more orderly public bus transport system will be made available to the public. Madam Speaker, for the information of the Honourable Members for Jerantut, Shah Alam and Bukit Bintang, regarding the construction of the LRT...
planned by the Indonesian government at present, the Trans Borneo railway network will become a complement to enable the movement of goods and passengers throughout the islands of Borneo. Regarding public transport in Sabah and Sarawak, this ministry, through LPKP Sabah and LPKP Sarawak (Commercial Vehicles Licensing Board), is restructuring public bus transport by introducing more comfortable and systematic buses through the Stop-and-Go Bus Transformation Expansion Programme (SBST) in Kota Kinabalu and Kuching. Through this programme, a scheduled and more orderly public bus transport system will be made available to the public. Madam Speaker, for the information of the Honourable Members for Jerantut, Shah Alam and Bukit Bintang, regarding the construction of the LRT...
May I interject, Minister, Lubok Antu. Yes, regarding the Trans Borneo just now. May I know the status of the feasibility study in Sarawak regarding the Trans Borneo? Also, I would like to know how much has been approved by the Government for that feasibility study? Thank you.
As I said, we have applied for a budget for the feasibility study to be carried out next year. Its status is indeed included in the budget allocated to the ministry. Perhaps as for the details, we can debate them further at the committee stage. Thank you.
Thank you, Minister.
For the Honourable Members for Jerantut, Shah Alam and Bukit Bintang, the reconstruction of the five stations previously postponed for LRT3 will not have an impact on the opening of operations of LRT3, also known as the LRT Shah Alam Line. The responsible party, Prasarana Malaysia Berhad, has drawn up and proposed two phases of opening operations separately: the first phase covers the entire 37.8-kilometre alignment and the 20 existing stations, expected to open for operations on 1 March 2025. The safety assessment of the station operations during the construction process of those five stations is being carried out to ensure the safety and comfort of passengers, in compliance with the construction work timeline. The second phase, the opening of operations of five additional stations, is expected to begin in the second quarter of 2027, which is two years after the opening of operations of Phase 1. The additional allocation of RM4.7 billion for LRT3 announced by the Right Honourable Prime Minister during the tabling of Budget 2024 will cover the main scope, including the construction of five stations, namely Tropicana, Temasya, Raja Muda, Bukit Raja and Bandar Botanik, including support systems for these five stations such as the electricity supply and distribution system and the control communication system, including information technology management. Second, the procurement of three sets of three-car trains to maintain the six-minute service interval for LRT3, as the travel time for each train from end to end will become longer with the addition of these stations. The train depot also needs to be upgraded with the addition of tracks, power conductor rail, signalling and train control systems, as well as depot equipment and maintenance vehicles, and other costs including the costs of the independent checking engineer (ICE), project management, fees to local authorities and service providers, taxes and interest duties during construction, insurance and legal fees. In addition, the allocation will also be used for other matters including payment of land acquisition costs under the original scope of work, payment of annual insurance premiums and additional fees to the ICE due to extension of the service period resulting from delays in completion during COVID-19. Land acquisition for
electric bus depots along the alignment, to provide feeder bus services to 25 stations, and the development of an automatic fare collection (AFC) system. For the information of the Honourable Member for Klang, the construction of the LRT3 project began in 2017 and, as of September 2023, the percentage of work completed is 89 per cent. To respond to the issue of flooding at the LRT3 project site, throughout the construction period, the project implementing party Prasarana and the LRT3 project contractors have constantly engaged with relevant parties such as the local authorities (PBT), the Public Works Department (JKR), the Drainage and Irrigation Department (JPS), the Environment Department, Occupational Safety and Health, as well as utility service providers involved in the construction of this project. This is to ensure that the construction carried out is planned, meets approval requirements, minimises the risk of traffic disruption and public safety, and natural phenomena such as pollution, flash floods, landslides and so on.
Thank you, YBM. Minister, just a little. I thank you for the very good answer. There is monitoring, but actually Honourable Minister, on-site when it rains, only I see that this week there is no flooding because there were works after I asked the question here. In the past month, all. Last week too there was flooding. So, I hope there is continuity of the works, always on the site. Thank you.
Works on the ground are indeed carried out continuously and do not stop. There is no delay in the implementation of the project, and I am confident that the contractors involved in the LRT3 project will take note of what the Honourable Member has raised. As for the question from the Honourable Members for Jerantut and Pasir Salak regarding the status of the MRT3 project: in line with the Government's cost-saving measures, the Ministry of Transport together with MRT Corp has carried out a review of the scope and rescheduling of the construction of rail-related support facilities for the MRT Circle Line 3, or MRT3. The results of this review have been submitted to the Ministry of Finance (MOF) for further consideration. For the information of the Honourable Member for Hulu Terengganu, regarding the issue of wheelchair lifts at commuter stations, there are 36 railway stations for commuter services in the Klang Valley and Seremban-Gemas networks equipped with 92 lift units and 45 escalator units. As of 23 October 2023, five lift units and three escalator units at six railway stations had to be stopped from operating to allow repair works and replacement of damaged components as well as upgrading works to be carried out. The lift and escalator facilities stopped from operating for repair and replacement of damaged components involve one lift unit each at Abdullah Hukum Station, Mid Valley Station, UKM Station, KL Sentral Station and Kampung Batu Station. The repair and replacement works for these components are expected to be completed in October and November 2023. For the lift and escalator facilities to be upgraded, the works are expected to be completed in the first quarter of 2024, involving Kajang Station and KL Sentral Station. The Ministry of Transport, through RAC and KTMB, is always committed to ensuring that all lifts and escalators at railway stations across the entire network are repaired promptly and function properly for use by the public, especially for senior citizens, pregnant women and persons with disabilities. For the information of the Honourable Member for Kulim-Bandar Baharu, KTMB (Malayan Railway Limited) has begun implementing initiatives to improve KTM Komuter services in the northern sector through increasing the frequency of train operations, especially during peak hours, by adding three sets of electric trains with a capacity of three coaches since 15 February last. Through this initiative, the total frequency of train operations on the Padang Besar-Butterworth route has been increased from 26 trips a day to 36 trips a day. This increase in trips
is implemented on the Butterworth-Padang Rengas route, from 12 trips to 16 trips a day. At the same time, the Ministry of Transport is carrying out the procurement process for 12 new electric train sets with a capacity of three coaches, and they are expected to be available for train operations in 2026. The addition of these electric train sets will further increase the capacity and frequency of northern commuter trains in the future. Regarding train speed, it is informed that the speed of existing commuter trains is proportionate to the speed set according to the permitted operating speed standards based on the type of train and track. For the information of the Honourable Member for Petaling Jaya, regarding the regulations for micromobility vehicles. The Ministry of Transport is carrying out a strategic collaboration with PPT to facilitate the use of micromobility vehicles. One related initiative is...
Menteri.
...the Regulatory Test-Bed Programme. Yes.
Thank you. Regarding the problem of broken lifts at LRT stations and so on. The time taken is too long. So, what are the alternatives to ease the burden for persons with disabilities, the elderly and the frail to use them? That is to say, if the recovery period is too long, it becomes a burden and a misfortune for persons with disabilities and also the elderly and so on. Is there any other alternative to overcome this problem? Thank you.
The other measure provided is that KTMB staff are always assigned to help persons with disabilities, women or senior citizens to cross to the opposite platform if the train is on the adjacent track that requires a bridge. So, indeed we have no other alternative, but we will try as much as possible to facilitate train movement or use platforms that do not require a bridge. That is all I think can be implemented at this time, but of course in terms of lift and escalator facilities, we do place emphasis on them. Regarding micromobility, one related initiative is the National Regulatory Test-Bed Programme for micromobility and the National Micromobility Vehicle Safety Day, which was carried out on 12 March last with the cooperation of PBT in Selangor. This programme is the first test-bed implemented for the operation of micromobility vehicles. Under this programme, any PBT that has safe micromobility vehicle route infrastructure and complies with the Micromobility Vehicle Route Planning Guidelines developed by KPKT through its agency PLANMalaysia may submit an application for exemption from the prohibition by the Ministry of Transport for the operation and use of micromobility vehicles at designated locations. This in turn can support the use of first-mile and last-mile connectivity in the national public transport system.
For the information of the Honourable Member for Batu, the MyJPJ application was launched from February 2023, and the transactions offered in the MyJPJ application include: (c) bidding for vehicle registration numbers; (d) checking the latest registration number; (e) checking and renewal of motor vehicle licences; (f) checking driving licences;
(g) checking test results; (h) checking summonses; (i) checking demerit points; (j) checking blacklist status; (k) JPJeq e-Aduan@JPJ; and (l) transaction history. At present, MyJPJ is undergoing an improvement process and its functions will be enhanced. In line with JPJ's aim to digitalise all JPJ services through digital channels, other JPJ transactions are expected to be implementable through the improved MyJPJ application by 2025, once all functions and infrastructure have been fully developed and prepared. This ministry seeks the cooperation of all Honourable Members to download the application and encourage the public to use the application to realise JPJ's digitalisation policy. The Honourable Member for Hulu Terengganu has proposed that the Government give rewards to road users who always obey the rules. For the information of the Honourable Member, the Ministry of Transport, through JPJ, always encourages road users to comply with the rules and avoid breaking the law for the safety of individual drivers and other road users from the risk of serious injury or death. Therefore, MOT through JPJ has implemented several systems with self-control elements, such as the KEJARA system, where those who comply with the rules can renew their LMM and LKM without restriction. I thank the Honourable Member for Hulu Terengganu for the proposal. MOT and JPJ always welcome any proposals and we will try to look at what form of reward can be given. Perhaps in cooperation with insurance companies or the like. Next...
Thank you, Honourable Member. However, what we often see, Speaker, is that when someone breaks our rules, we fine them. We fine, we summon, bring them to court and so on, but there are members of our society who have never broken road traffic rules. So, that is why I feel it would be better for the ministry to think of a way to reward them. Whether it is free licence renewal or a 50 per cent discount, or any reward that at least encourages the rakyat to obey road traffic rules and so on. Thank you, Mr Speaker.
I understand what the Honourable Member means, and indeed I have also discussed with the ministry's officers to look at ways. Among what we are looking at is whether we can work together with insurance companies, for example. Perhaps in terms of premiums, they could be reduced if they have not been involved in any offence, because if they have not been involved in offences, they may be disciplined drivers. So, that is among the matters we are trying to look at, but of course we need cooperation from third parties. Not only rewards from the ministry, but also from other parties such as insurance companies. Madam Speaker, regarding the regulation on dark tinted glass as raised by the Honourable Member for Kuala Krai: the rate of fines imposed on drivers or registered owners of vehicles that breach the dark tinted glass regulation is the original rate gazetted in the Motor Vehicles (Prohibition of Certain Types of Glass) Rules, namely that a person who is summoned may be subject to a composition with a staged payment rate of RM100 to RM250 within a period of 60 days.
I would like to take this opportunity, Madam Speaker, to clarify, because I know that various parties on social media are trying to portray or interpret a statement from an officer of the Road Transport Department (JPJ) as meaning that if they install tinted glass they will be sent to prison. That is actually not correct. It is true that under the law, if any party does not follow or comply with road traffic rules, when they are offered the opportunity to pay a compound, and they do not pay the compound, then they can be brought to court. That is a general rule which may carry a fine of up to RM2,000 or imprisonment of six months. That applies generally to all rules, not only to the use of tinted glass. But in reality, what is implemented or what action is taken is a compound. If they do not follow the rules, they are only compounded. I have already confirmed this with the land transport division and also with JPJ. That is, up to now there has never been a single case of this tinted glass being brought to court. What this means is that the question does not arise of being imprisoned if one misuses tinted glass. So, I hope this explanation can dispel or give an explanation to the public. That the government does not intend to imprison people, or send them to prison, if they use tinted glass. No. In fact, in 2019, Madam Speaker, I, who was then also the Minister of Transport, liberalised and facilitated the use of tinted glass for the public. We reviewed the rules, looking at practices overseas that comply with United Nations regulations, while allowing some leniency. The transparency rate for the front windscreen under the current sub-regulations is 70 per cent for the front glass. For the left and right side windows beside the driver, up to 50 per cent may be tinted. For the rear side windows and the rear windscreen, they may be completely black. This is what is permitted. The Honourable Indera Mahkota remembers 2019. I also informed the Cabinet at that time through a Cabinet memorandum that we had relaxed and permitted this. Because many said that in our country's hot weather, some leniency should be given regarding tint. Some did not agree. They said it would be dangerous if everything were dark. If any crime happened later, one would not be able to see what was happening inside the vehicle. But we adopted a balanced approach, namely not making everything dark. Not everything dark, in the sense that for ordinary people, they do not even need to apply to JPJ. At the rear, they may be entirely dark. Only, the driver's glass is 50 per cent and the glass for looking forward is 70 per cent. However, for another category, for VVIPs for example, Ministers. The Honourable Bagan Serai, the Honourable Indera Mahkota, the Honourable Pagoh have all previously been Ministers or members of the Cabinet. Vehicles involving Ministers or the Inspector-General of Police and so on are permitted to have fully tinted glass, or any party who feels they have a security issue may apply. I set this policy as early as 2019. I removed the discretion of the Minister of Transport. Previously, the Minister of Transport only had to sign, just a minute, and could issue a letter of permission. I transferred that power to the Director-General of JPJ. I said, "Ministers should not be involved, because later there will be integrity issues."
I do not want to be involved, because I know many would write to the Minister of Transport asking for leniency or exemption. I handed it over to the committee chaired by the Director-General of JPJ (KP JPJ). They carry out screening first. Whoever qualifies will have their list sent to the Minister for endorsement. For issues– but it is not free. Suppose there are wealthy people who have security concerns, fearing kidnapping and so on. They want tinted glass. They must first be screened by the police and screened by JPJ first. Once approved, it is brought for the Minister's approval, but a charge is imposed. I imposed a charge of RM5,000 for two years. Many paid, there was no problem. So, that is permitted, but with a payment of RM5,000. That is for certain specific cases, but for the general public, as I have said, the permitted rate is 70, 50 and blank VLT, which has been implemented since 2019. For those who may have health issues, if they obtain confirmation from a doctor, they are exempted. No payment is required. Please proceed.
Okay, thank you, Honourable Minister. Thank you, Mr Speaker. I thank the Honourable Minister for the answer given regarding the issue I raised. I raised this issue because at that time there was very widespread media reporting on what was announced by JPJ, and God willing, with the Minister's announcement today, the anxiety of the people below regarding enforcement, or regarding what was provided by JPJ at that time, will be removed. Because this report was a comprehensive report, and I hope the Minister's statement today can also be widely disseminated and the perception that has spread so widely can be corrected again. Thank you, Honourable Member.
Honourable Member, I hope you will also help to widen this clarification. I have indeed already pointed out that in terms of the message conveyed, it was not complete. It seemed as if we wanted to imprison people if they used tinted glass. That is not correct.
What the JPJ officer said was in general terms. It is true that under road traffic rules, there is such a provision, but it is not only for tinted glass and it is not a new rule. It is an existing rule, and for all traffic offences, if a compound has been given and they do not pay the compound, what is the next action? The next action is to bring them to court, but as I said in the case of tinted glass, not a single case has ever been brought to court. So far, there is only a summons or a compound. The compounds are also not many. Usually, if we have this tinted glass offence, they will be given a notice to come to JPJ. If they do not follow the rules, we ask them to remove the tinted glass or the sticker. So, if they do not comply with those rules, the compound is only between RM100 and RM250. That has already been imposed. So I hope that today's explanation can give a more comprehensive picture to the public and that it will no longer become a point of dispute among the public. Jelutong, are you there? Madam Speaker, regarding the addition of buses in Penang, for the information of the Honourable Jelutong, the Ministry of Transport, through Prasarana, has plans to increase the number of buses operating in Penang in order to improve public transport services. Through Rapid Penang, the number of daily bus operations is being increased from 154 buses in January 2023 to 237 buses in stages. Rapid Bus is optimistic to continue striving to improve the number of buses in Penang to 252 buses a day, with this addition process expected to be completed in the fourth quarter of 2023.
Honourable Minister.
Ya.
Thank you for that information, but I would like to record that since the Honourable Minister became Minister of Transport, Penang has received additional support from the Federal Government, such as the new additional ferry services. There is also good news regarding the expansion and upgrading of Penang International Airport, and also the newly given announcement of the addition of buses. Indeed, we thank you for all these announcements, and the people of Penang truly thank the new government because previously Penang had been neglected. However, I am confident and believe that Penang will continue to receive attention from the Honourable Minister. Thank you, Honourable Minister.
Thank you, Honourable Member, but what the Honourable Member has said is only half true. Not only Penang, we are also trying to help other places. Kelantan likewise, we help Kota Bharu Airport and we continue it, we do not stop at all. This is the Madani Government.
[Laughter] Honourable Minister. Alright, thank you, Honourable Minister, thank you, Madam Speaker. A continuation of what the Honourable Jelutong said a moment ago. Now the people of Penang have some grievances regarding the ferry issue, where if we look, recently four ferries were provided. That is a good thing. Only, now in terms of their operation, because they have only been operating for three months, yet the people are already complaining because many ferries have broken down. So perhaps the Honourable Member's side may be able to pay a little attention, thank you.
Do these broken-down ferries refer to the new ferries or the old ones?
The new ones.
So the new ones, I did not...
Boleh.
What broke down?
We received four, but only three are operating, so when...
No, the reason is there is always one spare, it has not broken down.
Okey.
In terms of their operation, even though there are four, they operate three, with one as a spare. If anything happens to the existing ferries, then it is activated. So it is not that they have broken down, Honourable Member, yes.
Only now, in terms of the journey, there is also a dispute by...
We will try to improve.
Alright, thank you.
Any feedback will be well received by the Penang side.
Terima kasih
Langkawi has nothing to do with ferries, right? Penang.
In connection with Jelutong, Honourable Minister. I am also moved, Honourable Minister, with feelings of sadness, sorrow and a little envy, because Penang is so close to Kedah, and much of the infrastructure in Kedah now needs repair and also attention from the Honourable Minister, especially in Langkawi.
No need to be envious, Honourable Member. We are fair to everyone, and in Kedah too we are continuing development projects, including the Kuala Kedah Jetty, which we are upgrading. That project is being implemented. It has been delayed for a long time. For several years there were various technical processes and it was re-tendered, but I have given a commitment that for the Kuala Kedah Jetty, which connects to Pulau Langkawi, the project is being implemented. I do know that in terms of dredging at Kuala Kedah and Kuala Perlis, this has indeed been an issue and a problem, and we are trying to address it so that the dredging issue there is resolved and does not affect ferry operations between Kuala Kedah and Kuala Perlis and Pulau Langkawi. The Pulau Langkawi Airport has also indeed been improved and has been upgraded previously. So there are many other transport projects being implemented that will provide comfort to users in the state of Kedah, including what I mentioned earlier for the Northern Commuter.
Menteri
Ya Jerantut.
In the Special Committee Meeting, we also discussed the Kuala Kedah Jetty mentioned earlier by the Minister's side. There is a slight financial shortfall of RM25 to RM26 million in the overall project. So I request that the relevant ministry reconsider adding that amount so that the project can be carried out properly.
Noted. What is short, we will indeed try to discuss with the Ministry of Finance. I do know that the Kuala Kedah project, the Kuala Kedah Jetty, has been delayed for a long time. I have made the announcement twice. In 2019 I made the announcement, but unfortunately it could not proceed well, there was re-tendering. This year I have given the announcement again that this project will continue, and whatever shortfalls there are, we will try to discuss with the Ministry of Finance so that it does not affect the implementation of this project. Now I want to move on to the issue or topic of electric bus procurement. For the information of the Honourable Puchong, Prasarana Malaysia Berhad is responsible for providing feeder bus services for the needs of LRT3. Prasarana has drafted and proposed that 150 electric buses and 3 bus depots are required to meet first mile and last mile needs along the LRT3 alignment. The breakdown of costs involved is as follows. The procurement cost of 150 electric buses is estimated at RM210 million based on current market prices. That is just an estimate. It does not necessarily reach that price, but as an estimate. The construction cost of three electric bus depots equipped with maintenance equipment and charging ports for electric buses is RM390 million, that too is an estimate. Indeed, there has not yet been any value management. It is indeed only an estimate, and we are trying to lower that cost. It also includes the construction of covered bus parking, a bus washing plant, with permission, a TNB power supply building and other related facilities. This cost estimate does not include the cost of land acquisition for two bus depots around Klang. However, land acquisition will not be necessary if it is proven that the two proposed depot locations in Shah Alam and Johan Setia are suitable, where the land status is owned by the government.
For the information of the House, the existing bus depot has reached its maximum capacity and cannot be upgraded, and in addition its location is not strategic for electric feeder buses because it is far from the LRT3 alignment. Nevertheless, the Ministry of Transport through Prasarana will study thoroughly the actual needs for the size and number of bus depots required before a final decision is made. The proposal for bus procurement through a leasing model. Indeed, we have identified that the use of EV buses, especially in the Klang Valley, has the potential to be a vehicle for reducing carbon emissions. The plan for purchasing diesel and EV buses will be realised through the Rapid Bus Fleet Replacement Programme initiative. Based on the study carried out, the total cost of ownership for purchasing EV buses is lower than for diesel buses. This determination takes into account the government's diesel subsidy. In addition, the repair and maintenance costs of EV buses are also lower compared with diesel buses. Meanwhile, regarding the comparison between the purchase and leasing methods, a quotation from the same government found that the TCO for leasing is higher than direct purchase. However, it has been informed that Rapid Bus is studying the plan for implementing the leasing method for EV buses, taking into account current needs as well as a more effective plan for short-term initiatives. This is because the leasing method will provide benefits in terms of not having high initial capital expenditure and ownership of the asset and risk being transferred to the lessor. However, the efficient use of EV buses must take into account the availability of EV charging infrastructure, because it is important to increase the widespread use of EVs and reduce range anxiety, okay.
Is the Honourable Batu there?
Tak ada.
If not, I will skip, okay. The Honourable Sri Gading's route?
Tak ada.
No. If not, I will move on. Is the Honourable Tuaran there?
Tak ada.
Okey.
Honourable Minister.
Ya.
A quick question.
Ya.
Madam Speaker, we have heard earlier about the buses provided in the city and in major towns, and the future of these buses appears fairly assured. I want to ask about the future of taxis. What are the government's plans for those who drive taxis? Will these taxis be made obsolete by time? For big cities like London and the US, they have their own identity and iconic taxis. In Kuala Lumpur, there are the red-and-white taxis. So I want to ask the Minister, is there a future for those who drive taxis, or will Grab devour them? Thank you.
Firstly, Honourable Member, in terms of public transport services, that depends very much on the operators too. So what
only an option for consumers; it must also provide comfort to passengers. So when asked whether taxis have a future, the answer is that they certainly do, but on condition that they also change in how they cope with or use digitalisation, online systems and so on, and in their services. That too must always be given attention, but whether taxis are fully taken over by e-hailing depends very much on the market. So under the system or policy that we have already implemented in our country, we allow both modes to operate together, namely taxis and e-hailing, and taxis can also offer their services through e-hailing applications. So it is not right to say it is only Grab, because e-hailing is not only about Grab. Grab is one company, but the e-hailing concept has indeed become an option for many passengers today. So I hope the Honourable Member can also give views or suggestions on how we can improve taxi services so that the welfare of taxi drivers also receives attention. Madam Speaker, I now move on to the aviation issue, because I see there are also issues that need attention.
Honourable Minister. A little, Honourable Member.
Ya.
Before moving to aviation. I think we have already covered land and sea, and now we are moving to air.
Dah ke?
Is it finished? A little.
Just a little. [Speaking without using the loudspeaker]
A little. I think I asked about the case of our lorry driver friends who are now holding a picket in Kelantan, Terengganu and also Pahang. I seek a response from the Minister.
Honourable Member. This concerns the picket. We also have to look at what caused this picket. The picket is because of enforcement. At the same time, as Minister, I cannot tell or ask the Road Transport Department (JPJ) not to enforce the law. So a balance must be given. We understand that drivers have complaints because they say enforcement is too strict, but if we do not carry out enforcement, the public will be angry with us because recently there have been several accidents involving lorries that are overloaded or carrying excessive loads. So we really need to enforce the existing law, but at the same time we also engage. The JPJ also engages with, for example, the lorry tipper association, to find a method for allowing their operations to run more smoothly. At the same time, the law must also be complied with. That is something we are implementing, and I am confident that we are trying to find a good solution so that operators or lorry drivers can take their lorries and operate as usual. At the same time, the safety of other parties can also be guaranteed. So I hope the Honourable Member, on this matter, will look at both sides, so that we do not see enforcement officers carrying out strict enforcement and then we also pressure them not to enforce. If so, that sends the wrong message to our officers, who are carrying out their duty to enforce the law so that the accidents that have happened can be prevented. So I hope there is a balance in that consideration.
Briefly, Minister. Setiu, just briefly.
In my speech too, Honourable Minister, we are not taking sides, yes, we are saying we are looking for a middle ground, and I strongly agree with the Minister's statement just now, to the extent that I also proposed the use of camera technology, weigh-in-motion, to resolve this problem. Because we know the considerations are, first, lives, and second, the considerations for lorry drivers too. So that was our argument just now, it is not that we are taking sides with any party.
Okay. I, I agree with what the Honourable Jerantut said. For information, weigh-in-motion is indeed being implemented. I think the tender for weigh-in-motion has already been submitted and we want to tender to obtain the weigh-in-motion equipment, but there is also a drawback because weigh-in-motion cannot be placed just anywhere. One, the cost. Two, perhaps we will only place it on main roads, but we are also worried there will be side effects. There are side effects. When we place it on main roads, drivers now have Waze, which will look for shortcuts. Then they will go into village roads, housing estate roads. Then another problem will occur. So that too is a balance we must consider. So I understand that we need to move with the changing times. In terms of implementation, for enforcement we indeed need newer technology. At the same time, they constantly want the JPJ to review the permitted load weight. We are ready to consider it, but the scope of duties or authority to approve the load weight does not lie with the Ministry of Transport. We also need to refer to the Ministry of Works (KKR), because the safety or permitted load on a particular road falls under the Ministry of Works. So we also need the views and approval of the KKR... [Interrupted] Yes.
Setiu, Minister. Before the Minister moves on to this air transport matter. Among the things I raised in my recent debate speech is the current status of the Gombak Integrated Terminal, which still has not started operating.
I will give a written reply on the Gombak Integrated Terminal, Honourable Member.
Sikit, Menteri.
Ya, Pagoh.
Thank you, Mr Speaker. I want to ask this because I understand the Honourable Member can answer this question, namely on the progress of the high-speed rail, which I think was also discussed in Cabinet before. We have already settled our problem with Singapore although we had to pay compensation. So that means there is no longer any link with Singapore. Although Singapore is interested in joining. I want to know whether there is a future commitment, because my feeling is that it had already been studied carefully before, and it appeared to be said to be viable. Moreover, not only to Kuala Lumpur, the next plan is to go north as far as Bangkok, because in Thailand there is already a high-speed rail that they are building, which will come down south as far as the Peninsula. So I want to know, what are the developments? Will it be continued or not?
Thank you, Honourable Pagoh. As Honourable Pagoh knows, the bilateral agreement with Singapore has indeed been terminated, since during the administration of Honourable Pagoh it was decided that the agreement be terminated and compensation has been paid to the Singapore side.
So we are free to determine a new direction. What is being implemented now is that we are looking for a new implementation model. The new implementation model we are trying is to find out whether the private sector can cover the CapEx expenditure to build this alignment, and also in terms of the system, the track, and also operating the service, but one principle we need to agree on is that it must connect Kuala Lumpur and Singapore point-to-point. Because if it only reaches Johor Bahru, it will not be a viable expenditure, since it does not connect the two largest cities or main cities in ASEAN.
So, it must connect Kuala Lumpur and Singapore. If we want to connect with Singapore, then we also need their agreement on implementation. So far, although just a few days ago, we held a leadership retreat with the Singapore side. This matter has not yet been discussed because at this time the Malaysian side, through MyHSR Corp, is implementing the Request For Information (RFI), which has been going on for several months already, and many companies are interested, they have submitted proposals. Some asked for a little more time to finalise their proposals. We are considering whether to give additional time, but we want to find a suitable financing method first, before we go and propose it to the Singapore side. As considered before. Why do we want to look again at the implementation module? Because we know that most of the HSR track is located on Malaysian soil. So, of course we want to look at a financing model that gives more advantage to our country, but at the same time, any operation of this track also requires the agreement of the Singapore side. So, we have to find a method that can be agreed by both sides. So far the RFI is being carried out. When the RFI is completed, we will present it to Cabinet, and if Cabinet agrees, we will then discuss it with the Singapore side. I think Honourable Member, at this stage we will focus first on between Kuala Lumpur and Singapore.
[Bangun]
Kuala Lumpur to Bangkok may be a second phase that requires a much higher capacity, far higher than what- than what is needed for Singapore. For Kuala Lumpur-Singapore too, I think it is not easy for the private sector to finance the whole thing, but we are open to receiving proposals that are to be submitted.
Minister once again.
Because I have only five more minutes, Honourable Member.
Briefly, briefly on the lorry driver issue just now. I agree with what the Minister answered regarding enforcement and so on. However, our hope in this Parliament is that, in the current situation where the people are in great hardship: rice is expensive, sugar is also expensive, petrol is not available, diesel will also rise in price. So, the consideration that there should be some humanity in the punishment given should not be a form of punishment, but a form of lesson for lorry drivers. Second, the issue regarding the aerotrain at KLIA which- I think it has long been neglected or broken. In 2026 we will celebrate Visit Malaysia Year, so when can the aerotrain be used again? Thank you.
Honourable Minister, regarding the sea. I have brought up an issue regarding the JMS Mersing licence. Regarding a request that the 10 nautical mile condition be abolished, thank you.
I have all the answers here, but I did not have time, there are 56 pages, I really did not have time to answer everything, but for what the Honourable Mersing proposed, in that respect we need to review it first, because it is among its definitions, because for the state it is only three nautical miles. So, what is requested needs to be reviewed first. It cannot simply be implemented or approved, because it also involves the movement of ships using the Straits of Malacca or our South China Sea.
That is true, Honourable Member, but if we look at more examples- I have given two examples of the same licence, namely CCTM Pahang-Tioman and KLW Kedah-Langkawi, neither of which has the 10 nautical mile condition. For the Honourable Member's information, Mersing has many islands, this 10 nautical mile limit only reaches the nearest island, namely Pulau Besar. If you want to go to Pulau Aur and Pulau Pemanggil, that is 35 to 38 nautical miles, Honourable Member.
Perhaps what I propose, Honourable Member, is that we can arrange a meeting with the Maritime Sub-Division (SUB Maritim) and also the Marine Department for the Honourable Member to present your case, so that we can see how to facilitate. That is what I propose. Regarding Hulu Terengganu, it is not that we are not showing consideration, Honourable Member. We also know that we want all parties to be able to operate well without any interference and any problems, but a balance must also be given. Because if we do not enforce the law at all, then it will run rampant. Overloading has become a major problem for road safety. So, I hope the Honourable Member understands. It is not that we are without consideration, we are trying to give a lesson and also try to reduce the problem of excessive load weight or lower the rate of overloading. May I have a few minutes if permitted by Madam Speaker until 1 o'clock, can I?
Honourable Minister may answer ....
Aerotrain, aerotrain.
If you will allow me, let me continue. This is a main issue- I think many are also interested, namely regarding the suspension of MyAirlines operations. Let me give some briefing or clarification on this matter. Next, regarding this MyAirlines issue, the suspension of MYAirline operations was raised by Honourable Bagan, Rasah, Libaran. This issue was answered by the Honourable Deputy Minister in the Special Chamber session on the Motion by Honourable Jerantut on 16 October last. For the Honourable Member's information, MAVCOM approved the Air Service Licence, or Air Service License MyAirlines, for a period of 12 months from 15 November 2022 to 14 November 2023. Meanwhile, the Civil Aviation Authority of Malaysia has approved the Air Operator Certificate, or Air Operator Certificate from 1 October 2022 until 30 September 2023. This AOC has been renewed by CAAM for a period of two years until 30 September 2025. In relation to the approval of the ASL, the basis for granting the licence took into account the business plan and the company's capability from the commercial and financial aspects as submitted to MAVCOM in October 2022. The granting of the licence went through a careful and thorough assessment which covered the assessment of market projections at global, regional and domestic levels as well as the assessment of the feasibility of the proposed business plan, the financial viability of the business, and the demand for air services on the proposed routes. In addition, the qualifications, suitability and experience of the Board of Directors, and the company's management, were also assessed to determine competence as well as
capability in operating an airline. When the AirAsia licence was granted to MYAirline, MAVCOM also required the company to have positive equity that could sustain the company's operations for at least three to six months, based on the business plan submitted. Based on MAVCOM's assessment at the time, the company and its shareholders had sufficient financial strength to commence flight operations as planned. After commencing flight operations on 1 December 2022, MYAirline's operating costs increased due to a sharp rise in the value of the United States Dollar against the Ringgit in the month as projected. The projected rate was RM4.30 against the US Dollar, but the actual rate was RM4.68 in September. Most of MYAirline's transactions are in USD, including aircraft payments, aircraft lease, and fuel, whose price has also risen from USD117 per barrel to USD131 per barrel. Based on the analysis carried out by MAVCOM on MYAirline's operations and finances on 3 October, the airline did not show signs of a deteriorating financial problem that could lead to a suspension of operations. This can be seen, among other things, from the minimal rescheduling of flights and refunds to customers that were completed within the stipulated time. In fact, MyAirline also had a plan to expand its operations to 12 aircraft from eight aircraft by the end of 2023. MYAirline informed MAVCOM on 9 October that the company was finalising the sale of shares to new domestic and foreign investors. However, up until the cessation of its operations, MyAirline had not yet succeeded in finalising it. This position had implications for the company's ability to finance daily operations. Accordingly, the company decided to suspend its operations immediately without giving any prior notification to the ministry, regulatory agencies and passengers. For the purpose of renewing the Air Operator's Certificate by CAAM for the period 1 October 2022 to 31 September 2023, after carrying out a Technical Audit inspection of the company from 29 May 2023 to 1 June 2023, CAAM approved the renewal of the AOC for MYAirline for a period of two years commencing 1 October 2023. This means, Mr Speaker, that the evaluation or Technical Audit inspection of MYAirline by CAAM was carried out in May; it was not two or three days before the cessation of operations. The audit was carried out earlier and it was found that they passed that audit, and therefore the AOC licence was permitted or continued by CAAM. The CAAM Technical Audit inspection was carried out thoroughly and carefully in accordance with the international standards set by ICAO. The audit inspection was to assess capacity and competence in the aspects of air transport, commercial, operations and airworthiness. Among the aspects assessed were the management and organisation system, maintenance and airworthiness, safety and cabin operations. In addition, the financial aspect was also included as an audit element, which serves as a basis for the company's ability to operate safely. In this regard, based on the audit report made from 29 May to 1 June, CAAM was satisfied and renewed the AOC. Following the suspension of operations by MYAirline, MAVCOM is working closely with CAAM in addressing issues related to the suspension of the company's operations. MAVCOM is taking action based on the provisions under the Malaysian Aviation Commission Act to re-evaluate the granting of the company's ASL licence, including the imposition of financial penalties should the company fail
to comply with consumer protection provisions as stipulated by- under MACPC. MAVCOM issued a Show Cause Letter on 13 October 2023. In the Show Cause Letter, MAVCOM directed MYAirline to provide an explanation regarding the airline's failure to comply with the conditions of the ASL, and its sudden suspension of operations on 12 October. MAVCOM received MYAirline's written explanation on 27 October. After studying the written explanation, MAVCOM on 1 November, which was yesterday, decided to suspend MYAirline's ASL with immediate effect, in accordance with section 43(1) of the Malaysian Aviation Commission Act, because the explanation given by the airline was unsatisfactory. At the same time, under regulation 193(3) of the Civil Aviation Regulations 2016, CAAM temporarily suspended the AOC of MYAirline with effect from 16 October for a period of 90 days pending the outcome of further investigations. The temporary suspension of MYAirline's operations on 12 October without prior notification to CAAM has raised serious concerns over public safety and the overall integrity of civil aviation operations in Malaysia. A Detailed Safety Audit will be carried out on MYAirline during this temporary suspension to re-evaluate the airline's capability. Based on the latest data received from MYAirline, the suspension of operations has affected 117,461 passengers who had already purchased flight tickets offered by the company for seven domestic routes and two international routes, namely Kuala Lumpur-Penang; Kuala Lumpur-Kota Bharu; Kuala Lumpur-Langkawi; Kuala Lumpur-Kota Kinabalu; Kuala Lumpur-Tawau; Kuala Lumpur-Kuching; Kota Kinabalu-Tawau; as well as Kuala Lumpur-Bangkok; and Kuala Lumpur-Don Mueang, Thailand. The total value of tickets sold up to March 2024 is RM22,090,148. With regard to assistance to customers affected by the suspension of MYAirline's operations, I am pleased to inform the Honourable Member that the MOT, through MAVCOM, will ensure that all complaints against MYAirline are acted upon and resolved as stipulated under the Malaysian Aviation Consumer Protection Code 2016, which was introduced and enforced with effect from 1 July 2016. The MOT, through MAVCOM, is closely monitoring this situation and will ensure that all complaints and issues raised by the affected passengers due to the suspension of MYAirline's operations are fully resolved. MYAirline has assured MAVCOM that it will fulfil its obligation to make refunds to the affected passengers. MAVCOM has also held discussions with Bank Negara Malaysia regarding the issue of refunds to affected customers in this matter. Bank Negara has confirmed that passengers who purchased tickets via credit card, debit card or direct debit may claim a refund through the chargeback process if the travel date has expired, by contacting MYAirline or contacting their own bank. Finally, the ministry once again wishes to give its commitment that the Ministry of Transport, through MAVCOM, and CAAM will continue to prioritise the interests and safety of consumers at all times. The ministry will continue to monitor the current situation until the issues related to the suspension of operations are fully resolved. Madam Speaker, I have taken longer than the time allocated to me by the Speaker, and once again I thank all the Honourable Members who have raised and debated issues concerning the Ministry of Transport. There are many more issues that I did not have time to answer. We have one more opportunity
namely during the Committee Stage, where we can examine the debate and the issues I did not have time to answer more thoroughly, and we will provide a written Notice.
Honourable Minister, may I have a little time?
Terima kasih.
May I squeeze in, regarding the airport.
Time is up. Thank you, Honourable Minister. Honourable Members, since the time now shows 1.04 pm, I am adjourning the sitting now, and it will resume at 2.30 pm. Thank you.
[The sitting was suspended at 1.05 pm]
[The sitting resumed at 2.30 pm]
[The Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor) presiding
We continue with the debate. I invite the Minister of Human Resources, 50 minutes.
Thank you, Mr Speaker. I extend my greetings of peace and Malaysia Madani greetings to all Members of the House. First of all, allow me to record my appreciation to the Honourable Minister of Finance for the tabling of the Appropriation Bill 2024 on 13 October 2023. I would like to thank the 27 Honourable Members who raised a total of 51 questions, issues and proposals relating to the Ministry of Human Resources during this debate session. Mr Speaker, as tabled, the 2024 Budget carries the theme "Economic Reform, Empowering the People". The Honourable Minister of Finance described this budget as the second Madani Budget, reflecting the determination and commitment of the Unity Government to give substance to a sincere initiative to uplift the status and well-being of the nation's economy and people. As Honourable Members are aware, the second Madani Budget allocates RM393.8 billion for 2024. Of this amount, the allocation for the Ministry of Human Resources in 2024 is RM1.47 billion, namely RM889.55 million under operating expenditure and RM578.03 million for development expenditure. Overall, the proposed allocation is an increase of RM110 million or 8.13 per cent compared with the 2023 allocation approved of RM135 billion. The approved allocation generally covers the implementation of labour training programmes, trade unions, industrial relations, in addition to construction and upgrading projects for training institutions, procurement of equipment under the Department of Human Resources, and the enhancement of workers' skills. The Honourable Minister of Finance announced that skills training and skills upgrading programmes will be continued through Human Resource Development Berhad with the existing levy collection fund of RM1.6 billion to provide 1.7 million training places.
Human Resource Development Berhad will reallocate a special fund using 15 per cent of a portion of the total levy collection to implement Madani training programmes for micro, small and medium enterprise entrepreneurs as well as vulnerable groups, ex-convicts, prisoners, persons with disabilities, senior citizens and retirees. Although there are two eligibility criteria that must be met for- however, there are two eligibility criteria that must be met for Human Resource Development Berhad to reallocate the special fund using 15 per cent of the total levy collection, namely first, employers who use less than 50 per cent of their levy, and second, the employer's remaining levy after use in the current year must exceed RM50,000. Mr Speaker, in line with efforts to uphold the development of human capital, this ministry is grateful for the consent of His Majesty the Yang di-Pertuan Agong, who graciously honoured the opening ceremony of the National Human Capital Conference & Exhibition at MITEC, Kuala Lumpur on 30 October 2023. This annual conference, organised by Human Resource Development Berhad this time, has made history by being recognised by the Malaysia Book of Records as the largest human capital development conference ever held in Malaysia and in Southeast Asia, with a total of 4,000 conference and exhibition delegates and 400 exhibitors. The Government has also allocated RM30 million through PERKESO to provide a special incentive of RM1,500 per month for six months, which will benefit 3,300 job seekers, aimed at encouraging private employers to employ vulnerable groups or those who are easily affected, such as persons with disabilities, ex-convicts and senior citizens, to obtain employment. Furthermore, Mr Speaker, the Homemakers' Social Security Scheme will be continued with an allocation of RM50 million, which will benefit more than 400,000 female homemakers registered under eKasih. The Government will increase the monthly wage ceiling for PERKESO contributions from RM5,000 to RM6,000. This increase will raise cash benefits at a rate of 20.2 per cent, which will benefit 1.5 million workers and their dependants.
Mr Speaker, next allow me to answer the questions raised by the Honourable Members relating to the Ministry of Human Resources. The issues and questions will be answered together according to the themes that have been identified. The first theme concerns technical and vocational education and training (TVET). Six Honourable Members, namely the Honourable Member for Tenggara, the Honourable Member for Padang Besar, the Honourable Member for Maran, the Honourable Member for Wangsa Maju, the Honourable Member for Seputeh and the Honourable Member for Ipoh Barat, raised issues related to TVET, among which are: (i) first, the proposal to place technical and vocational education and training (TVET) under one ministry; (ii) efforts to mainstream the TVET field; (iii) issues of coordination, standardisation and coordination of TVET programmes in line with industry demand; (iv) the issue of the status of collaboration with government-linked or private companies; and (v) skills, skills upgrading and reskilling based on TVET. Mr Speaker, Budget 2024 allocated a total of RM6.8 billion for the implementation of TVET programmes, comprising elements of operating expenditure and development expenditure. This allocation is the cumulative allocation
distributed to 12 ministries, covering skills, skills upgrading, reskilling and cross-skilling programmes based on TVET. Following that, RM100 million is allocated to provide industry-recognised professional certification to TVET graduates and as an incentive for industry to collaborate with public TVET institutions. To uplift the status of TVET tahfiz, the Government has allocated RM17 million to implement the TVET tahfiz programme, which will open opportunities for tahfiz students to diversify their skills while continuing their hafazan studies. For TVET education financing, the Government has allocated training funds for TVET through the Skills Development Fund Corporation amounting to RM180 million, which will benefit 12,000 trainees following skills certification programmes, and RM20 million is set aside for trainees in the maritime and arts fields at ASWARA, and for maintenance, repair and overhaul for the aerospace sector. As the Honourable Member is aware, there are currently 12 ministries directly involved in the implementation of TVET programmes. Each ministry has its own TVET institutions, programme offerings and target groups in an effort to provide human capital to meet the needs of the job market. Regarding the proposal to place TVET management under one ministry, this matter needs to be studied carefully, taking into account the views of all stakeholders involved, and requires collective agreement. Any proposal for structuring through comprehensive rationalisation, consolidation and centralisation measures will be considered and its effectiveness studied together with all stakeholders. To address this issue, one step taken by the Government is through the establishment of the National TVET Council, known as MTVET, as an initiative to improve the coordination of the national TVET ecosystem, which acts as the highest body in making decisions regarding the national TVET direction. Basically, MTVET has outlined an agenda to improve and strengthen the implementation of TVET in Malaysia covering aspects of governance, quality, industry, financing and branding, based on three strategic pillars, namely Integrated and Harmonised Governance, Industry-Driven TVET, and TVET - Shaping the Future. Mr Speaker, the Government has mainstreamed TVET skills training as the primary choice. The Government has widely opened skills training opportunities to all Malaysians regardless of race and socio-economic status. Various efforts to promote TVET throughout the country have been and will continue to be implemented on an ongoing basis through various approaches such as outreach programmes, carnivals, and publicity on electronic media or social media platforms to broaden the reach of information on opportunities and potential TVET career pathways.
A little, Minister. Tenggara. Thank you to the Speaker and also to the Minister. I just want to ask about MTVET. We are aware that certain TVET hubs have been established throughout the country. One of them that I have visited is the Malaysia Automotive TVET Collaboration Hub at PSAS. So, is the Government- let me ask, then. Will the Government continue the TVET hub initiative, because I see there is indeed a need and synergy that has now been formed to combine several TVET skills centres into one hub and focus on one particular skill. For example, like at PSAS here, which is related to automotive, it is very good. So, I hope MTVET can be unified and strengthen matters related to hubs, and I take this opportunity, as the representative of the Member of Parliament for Pengerang and Kota Tinggi, because on the right side of us here there are people from Pengerang and also the Education Office
District of Kota Tinggi... [Pointing to seats in the Public Gallery] Welcome. Thank you... [Applause]
Yes, thank you, Honourable Member. We will indeed continue with the efforts that have been implemented previously, and through the National TVET Council (MTVET) we will also look at other, better prospects to ensure that the quality of TVET education provided in our country can always be expanded and also enhanced. Thank you, Honourable Member. Opportunities to enter skills training have been opened to school leavers in order to increase the number of skilled workers in the job market. Accordingly, campaigns to raise awareness and positive perceptions of TVET skills training among potential students and parents continue to be intensified and expanded. This campaign emphasises the benefits of entering the job market with skills qualifications, including job opportunities and more attractive career paths through the recognition of the Malaysian Skills Certificate. In addition, the government has introduced the TVET articulation principle to add flexibility to the educational pathways of graduates in the TVET stream up to the highest level of qualification in the Malaysian Qualifications Framework (MQF), namely the doctoral degree. This articulation principle can strengthen lifelong learning pathways for the community and, in turn, enhance the reputation of the TVET pathway so that it is on par with the academic pathway. In an effort to attract more young people and Malaysian workers to join TVET programmes, the Ministry of Human Resources, through the Industrial Training Institute of the Department of Human Resources, has opened wide opportunities for them to take part in the various skills training programmes offered, particularly modular programmes, and, with permission, customised ones. Mr Speaker, the implementation of flexible and short-term TVET programmes can improve skills within a short period and can attract the interest of young people and workers to join TVET programmes. The programmes implemented are based on the National Occupational Skills Standards developed by the Department of Skills Development together with industry players. These programmes cover various skills fields such as electrical technology, mechanical technology and manufacturing technology. As of 30 September 2023, a total of 67,369 participants have taken part in these short-term courses.
Mr Speaker, the Ministry of Human Resources, through Human Resources Development Berhad, is committed to encouraging workers to continue upgrading their knowledge base through skills training, including TVET-based training. As of 30 September 2023, a total of 258,862 training places have been approved to implement training involving allocations totalling RM124 million. In addition, Human Resources Development Berhad also offers online learning through the e-LATiH platform. As of 30 September 2023, 1,900 courses have been offered free of charge, involving 350 thousand registrations to take part in these courses. Mr Speaker, regarding the issue of TVET coordination, a single quality assurance system for TVET has been introduced through the adoption of a document, with permission, the Code of Practice for TVET Programme Accreditation (COPTPA). This document serves as a reference and is used by TVET providers in offering and ensuring the quality of TVET programmes that are authorised and accredited by the Department of Skills Development and the Malaysian Qualifications Agency (MQA). Looking ahead, and in line with the strategy of the Twelfth Malaysia Plan, a national TVET database is being developed to coordinate and integrate all TVET data and information comprehensively across ministries and
TVET stakeholders. The integration of this data is very important in helping the government formulate policies, draw up strategic plans and make decisions more accurately and effectively based on facts and the production of information analysis, with permission, data-driven decision-making. Mr Speaker and Honourable Members, direct industry involvement in the development of standards and the implementation of training curricula is very important in ensuring that the implementation of TVET programmes is in line with the current needs of industry, particularly practical skills aspects, to provide exposure and real work experience before they are certified. Industry expertise is utilised for the development and design of curricula, the delivery of training and the upskilling of teaching staff through initiatives, with permission, train-the-trainers. Furthermore, collaboration also involves partnerships and contributions from industry in terms of high-technology equipment to TVET institutions to ensure the transfer of knowledge and skills that are aligned with current industry needs. This measure is intended to reduce the issue of mismatch. For the information of this august House, the ministry, through the Department of Skills Development, has appointed, with permission, Industry Lead Bodies, which are the development organisations for a particular industrial sector in developing National Occupational Skills Standards (NOSS). Through the Industry Lead Bodies, these experts and industry practitioners provide input and are directly involved from the early stages of NOSS development, which is subsequently used as the reference standard in developing TVET programme curricula. Consequently, efforts are being made to increase and involve more industry parties in the implementation of TVET programmes. The government, through MTVET, is actively exploring opportunities for collaboration involving government-linked and private companies through the signing of memoranda of collaboration. The memoranda of collaboration will open wider access and facilitate the establishment of collaborative relationships between industry and public TVET institutions to ensure that both parties obtain benefits from such collaboration. As of 5 October 2023, a total of 61 memoranda of collaboration have been signed involving 17 government-linked companies and 44 private companies, covering the scope of curriculum and training material development, contribution and sharing of equipment as well as facilities and expertise and training programme funding. Mr Speaker, the Honourable Member for Kuala Langat raised the issue regarding the number of student enrolments in TVET programmes, which is said to be unsatisfactory. For the information of this august House, based on data collected by the Ministry of Economy from 2020 to 2022, the rate of trainee enrolment in TVET programmes shows a very significant upward trend. The growing interest of youth and the public in TVET-based education is increasing. The total enrolment for 2020 was 130,440 persons. Meanwhile, in 2021 it increased to 163,984 persons, and in 2022 the total continued to rise. I also observe that the trend for 2023 shows the total is also increasing. Therefore, we can see a positive trend in the intake of students into TVET institutions throughout the country. The Honourable Member for Gopeng asked about the number of students trained under the Ministry of Human Resources and how effective the TVET programmes implemented have been? For the information of this August House, a total of 77,234 Malaysian Skills Certificates were issued specifically for 2023, covering skills certification levels from Level 1 to 5. Of this total, 48,964 certificates, or 63.4 per cent, were certification in the proficient category. This data shows the government's continued commitment to enhancing the skills and employability of the community
and giving emphasis to TVET in efforts to achieve the national development goal of a high-income nation. Mr Speaker, overall, the employability trend of TVET graduates is showing encouraging improvement. For 2020, the employability rate of TVET graduates was at 87 per cent. In 2021, the rate increased to 88 per cent, and 92.5 per cent in 2022. This increase indirectly reflects the effectiveness of TVET programmes in meeting industry needs and providing employment opportunities in Malaysia. The Ministry of Human Resources will continue to ensure that proactive measures are taken to support the sustained growth of this vocational education and to ensure that the quality of these programmes continues to be improved from time to time. Mr Speaker, the Honourable Member for Padang Besar has raised the issue of guidelines for identifying the skill levels of workers in Malaysia by improving the Malaysian Standard Classification of Occupations (MASCO), which is the national benchmark for occupational classification within the national employment structure. For the information of this August House, the Ministry of Human Resources, through the Department of Skills Development, plays a major role in the development of workers' skills in Malaysia through the gazetting of the Malaysian National Skills Development Act 2006, namely Act 652. Under this Act, the National Occupational Skills Standards (NOSS) are a clear guideline developed to identify the skill levels of workers required to meet industry needs. With the existence of NOSS, industry and training providers can ensure that workers have skills relevant to the demands of the job market in this country. The NOSS document has set five levels that can help measure workers' skills as follows: (i) Level 1. Routine workers can be estimated; (ii) Level 2. Requires responsibility and autonomy; (iii) Level 3. Complex and non-routine work is performed; (iv) Level 4. Occupational skills with a broad scope and professional; and (v) Level 5. Work with the highest skills.
Mr Speaker, the Malaysian Standard Classification of Occupations (MASCO) is the main reference for occupational codes and classifications in Malaysia. It was developed according to international occupational classification standards, with permission, the International Standard Classification of Occupations, which lists the task descriptions and codes for each position. Along with technological development and digitalisation, MASCO, which was published in physical form in 1998, has shifted to a digital platform with the introduction of the eMASCO portal, which replaces the periodically printed occupational taxonomy. The eMASCO portal was launched in October 2021, which benefits public and private agencies in obtaining occupational information quickly and easily. Taking into account developments in the labour market and the need for highly skilled occupations, the Ministry of Human Resources is improving and strengthening the content of the eMASCO portal in line with current developments in the job market. The Ministry of Human Resources will hold engagement sessions with all stakeholders for this purpose. Mr Speaker, the Honourable Member for Sungai Siput has proposed that the government build a TVET college for the residents of Sungai Siput so that the people have access to quality technical education covering technologies such as solar, engineering and so on. It is my pleasure to inform the House that as of 30 September 2023,
there are a total of 152 TVET skills training institutions throughout the state of Perak, comprising 118 public skills training institutes, including two TVET institutions operated by the Ministry of Human Resources, namely the Ipoh Industrial Training Institute and the Taiping Advanced Technology Training Centre (ADTEC). Both institutes offer TVET programmes covering various fields such as mechanical technology, electronic technology and computer technology, from certificate level up to diploma level. Of the total number of TVET skills training institutions mentioned above, 34 institutes are private skills training institutes. The TVET skills training institutions implement programmes based on national occupational skills standards in various fields that span 21 sectors of the national economy. Meanwhile, in the Sungai Siput district, there are two TVET skills training institutions, namely the GiatMARA Sungai Siput Certified Centre, which offers electrical and automotive programmes, and SMK RLKT Lasah, which offers crop technician programmes. In addition, there are also several existing TVET skills training institutions located in areas near Sungai Siput, namely GiatMARA Tambun, GiatMARA Larut, Kerian Community College, SMK Simpang, SMK Alor Pongsu, SMK Dato' Hj Hussein and SMK Kubu Gajah. Based on the establishment and operation of the existing TVET institutions, the government currently does not have any plans to build new TVET institutions in Sungai Siput. Mr Speaker, the second theme concerns the implementation of the minimum wage. Five Honourable Members, namely the Honourable Member for Ipoh Barat, the Honourable Member for Parit Buntar, the Honourable Member for Batang Sadong, the Honourable Member for Kluang and the Honourable Member for Libaran, debated the implementation of the minimum wage with: (i) a proposal to expedite the increase of the minimum wage by taking into account aggregate inflation; (ii) a proposal to focus on middle-income workers to increase their wages and productivity; and (iii) the issue of the enforcement status of the Minimum Wages Order 2022. The government always views seriously the agenda of wage restructuring, especially through the implementation of the minimum wages order. The minimum wage rate is reviewed from time to time based on the national economic growth scenario and changes in the cost of living of the people. The Ministry of Human Resources, through the National Wages Consultative Council (MPGN), is in the process of carrying out a review of the minimum wages order. This review must be carried out at least once every two years, in line with the provisions of section 25 of the National Wages Consultative Council Act 2011 [Act 732]. Mr Speaker, the implementation of this review is important in ensuring that the adjustment of the minimum wages order made is, with permission, evidence-based policy. This study is carried out through empirical field study methods, and to strengthen this study, it is supported by quantitative analysis based on administrative data that aims to assess economic capacity and the impact on the national labour market and to determine the new minimum wage rate. The determination of the minimum wage rate in this review also takes into account socio-economic indicators such as the poverty line income, the median wage, with permission, which reflects employers' ability to pay wages, the unemployment rate, labour productivity and changes in the consumer price index that reflect the cost of living. For the information of this august House, as of now, the review implementation phase has reached 70 per cent completion. The National Wages Consultative Council Technical Committee is actively conducting public consultations and 15 engagement sessions throughout the country. Mr Speaker and Honourable Members, as everyone is aware, the Minimum Wage Policy was formulated to set floor wages, with permission, floor wages for the lowest category of workers in the labour market.
Based on the Household Income and Basic Amenities Survey, the Department of Statistics Malaysia found that the wage income of Malaysians increased to 62.8 per cent in 2022, contributed by the increase in the minimum wage in that year. The implementation of the minimum wage has been proven to have a positive impact on the wage increase of low-income workers. Therefore, labour market intervention must next look at middle-income workers who are squeezed, with permission, squeezed middle, as reported by the Ministry of Finance in the Economic Outlook 2024. Referring to the report from the Department of Statistics Malaysia for 2022, the composition of semi-skilled workers is the highest at 58 per cent, while 30 per cent are skilled workers and the remaining 12 per cent are low-skilled workers out of the total of 15.4 million workers. In the context of wages and salaries, data shows that semi-skilled workers receive wages almost the same as low-skilled workers. Based on the wage and salary survey of the Department of Statistics Malaysia in 2022, the median monthly wage of semi-skilled workers is RM1,817 compared with RM1,635 for low-skilled workers. Given that the number and composition of these semi-skilled workers are high in the labour market, their wage rates will have an impact on the overall national wage and salary structure. In expanding the scope of this target group, the government has been and will continue to explore and study in detail the implementation of suitable wage models, including improving the implementation of several existing wage models and systems. The proposed Progressive Wage Policy, which is based on the concept of voluntariness, incentive-based and linked to productivity, will be implemented as a complement to the Minimum Wage Policy and the wage system linked to productivity, the PLWS. The implementation of the PLWS can ensure that any wage increase is in line with increases in productivity or higher performance. This system enables workers to obtain a fair share or wage from the increase in their productivity and performance. As of September 2023, 98,119 employers have implemented the PLWS and benefited 5.9 million workers at various levels of employment, including semi-skilled workers.
The government is also aware that there is a need to study and establish comprehensive wage-setting guidelines to improve the efficiency of wage and salary determination across various categories of employment, including semi-skilled workers as well as graduate starting salaries.
Honourable Minister, in front. May I have a moment? Thank you, Mr Speaker. Before the Honourable Minister goes further on this wage issue, I would like to return briefly to the minimum wage mentioned earlier. I have raised in this August House the challenges faced by entrepreneurs in the security sector, the food supply sector and also the cleaning sector, especially in schools. I understand that the Ministry of Education will also have comments on this, but this relates to human resources. This is because, when the minimum wage was introduced previously, payments to these companies by the government, whether in education or health, such as those managing hospitals, did not comply with the minimum wage amount that had been set. As a result, these entrepreneurs and contractors who supply goods and services to the government have experienced difficulties in paying wages based on the minimum wage to their workers. Legal action has been taken by the ministry and the Department of Labour, in particular, which has taken legal action all the way to court. So, I seek an assurance from the Honourable Minister, and if possible, I would also like to record this for Indera Mahkota as Chairman of the relevant JKPK, who is to come up with this solution once I inform him, but
I would like to ask the Honourable Minister for an assurance, if possible, and I hope it can be given. As long as full payment based on the minimum wage rate set by the government has not been settled, the ministry should not take legal action against these entrepreneurs. It is not their fault. The government has not paid. Thank you, Honourable Member.
Thank you, Honourable Member. I have taken note of the matter raised by the Honourable Member. I do understand the issue raised by the Honourable Member in depth. The parties involved have also come to meet me, and I have held several meetings with them to find a solution. I have also held discussions with other parties in the government, including the Ministry of Education and the Ministry of Health, which are also involved in this issue. Also with the Ministry of Finance to find a solution to the problem raised by the Honourable Member just now. I do understand the difficulties faced by these employers in paying wages to their workers. I will try to find the best solution to enable the employers, as well as the workers, to receive what they should receive. Thank you, Honourable Member.
Honourable Minister, Sik depan ini.
Ya.
There is a little. Thank you, Mr Speaker. I would like the Honourable Minister's view. Some experts have said that the Progressive Wage Policy now appears no longer realistic to implement, and that the best approach is for the government to emphasise that the Minimum Wage Policy must be pushed so that it is realised and appears more realistic for the government to implement. So, what is the ministry's own view on these two policies, where are we heading? Including the ministry's own focus. Which party or which policy should be implemented first so that the framework for a better wage policy for the people can be put into effect? Thank you.
Thank you, Honourable Member. There are indeed various views on the existing wage models. In my speech, I said that the Progressive Wage Policy is a complement to the Minimum Wage Policy. This means that the Minimum Wage Policy will remain. We will not abolish the Minimum Wage Policy. The Minimum Wage Policy is important to ensure that those with low skills also receive wages commensurate with the work they do. We do not want there to be discrimination against workers with low skills, but at the same time, to be fair to employers, we also want to ensure that they pay wages according to worker productivity. Perhaps in a scenario where the Minimum Wage Policy does not determine a worker's productivity. For a worker with low productivity, and a worker with high productivity. A worker who has an interest in following technical training and so on, compared with a worker who does not have that skill. So, paying the same minimum wage of RM1,500 to both these workers is unfair to employers and also to workers. So, under this Progressive Wage Policy, those who can show better performance have high productivity. Thus, they will receive wages
that are higher compared with workers who have low skills or low productivity. Thank you.
Honourable Minister. Honourable Minister, thank you. The additional Progressive Wage Policy has indeed been eagerly awaited. However, when I checked the budget, the details are indeed absent. I heard the speech of the Honourable Minister of Economy on this issue, and it was said that the details exist, but under one of the items of a ministry. My question, because this involves the Honourable Minister's ministry as well, especially from the implementation aspect. What is the total budget, the details for this Progressive Wage Policy? Because I understand that this is not a compulsion on employers. That means the burden will not be placed on employers, but is an incentive base under the government's budget. Because if we follow the track record or the previous president, in 2019 we introduced Malaysia At Work, or Malaysia Kerja, where the government earmarked a fund of RM6.5 billion for this purpose. So, for the Progressive Wage Policy earlier it was RM5.6 billion, now how much has been allocated by the government? Thank you.
Honourable Member, to answer that question, I ask that the Honourable Member wait until the White Paper is tabled in the Dewan Rakyat so that we can see as a whole how this Progressive Wage Policy will be implemented. This White Paper will be tabled in the Dewan Rakyat before long. Thank you, Honourable Member. Mr Speaker, the Ministry of Human Resources, through the Labour Department of Peninsular Malaysia, Sabah and Sarawak, always takes various proactive steps to ensure employers' compliance with the Minimum Wage Order 2022, among them: (i) providing advisory services regarding directives issued by the Ministry of Finance Malaysia; (ii) conducting investigations into complaints received from workers; (iii) carrying out statutory inspections from time to time; and (iv) taking prosecution action with a maximum fine of up to RM10,000 for each worker upon conviction for offences under section 43, National Wages Consultative Council Act 2011. For the period from 1 May 2022 to 30 September 2023, a total of 1,658 complaints were received by the Labour Department of Peninsular Malaysia, Sabah and Sarawak regarding non-compliance by employers from various sectors with the wage rates stipulated under the Minimum Wage Order 2022. Throughout the same period, the Labour Department of Peninsular Malaysia, Sabah and Sarawak has opened 380 Investigation Papers, and 148 prosecutions have been carried out for employers' failure to make wage payments in accordance with the Minimum Wage Order 2022, amounting to RM262,100. Mr Speaker, the third matter I wish to raise today is related to the theme concerning gig workers.
A total of four Honourable Members, namely the Honourable Member for Machang, the Honourable Member for Tenggara, the Honourable Member for Tumpat and the Honourable Member for Titiwangsa, have raised issues concerning gig workers, namely in terms of law-making, social security protection and initiatives provided by the government. For the information of this august House, the Ministry of Human Resources acknowledges that many Malaysian workers today choose jobs that offer flexibility
in terms of working methods, working hours and income according to individual needs and preferences. In view of this concern, the Ministry of Human Resources is drafting a specific guideline for gig workers involved with e-hailing and platform provider companies. This guideline covers six main elements, namely: (i) income; (ii) social protection; (iii) awareness of occupational safety and health aspects; (iv) freedom to work, to speak and to negotiate; (v) training and career guidance; and (vi) redress mechanisms. In addition, the existing social security protection also plays a major role in helping to create social justice and harmony for gig workers. This shows the government's sincerity and commitment in overcoming the issues faced by gig workers and creating a fairer environment for them. Mr Speaker, in general, social security protection for gig workers is divided into two: individuals who work on the ground with customers, such as taxi drivers. Another category is online workers, for example software developers and part-time workers. The Ministry of Human Resources, through PERKESO (Social Security Organisation), has introduced the Self-Employment Social Security Scheme to provide protection for individuals who run their own business, including gig workers, under the provisions of the Self-Employment Social Security Act 2017 [Act 789], which came into force on 1 June 2017. This scheme provides protection to self-employed persons against occupational hazards, including occupational diseases and accidents while carrying out self-employment activities, including while on the way related to self-employment activities.
[Bangun]
Protection begins from the date and time the contribution is paid and is certified through the contribution payment receipt.
Honourable Minister, regarding e-hailing. This is a current issue, which is why I have had to ask this additional question. I am worried about the fate of e-hailing workers, especially Foodpanda and Grab, because it is reported that next month Delivery Hero will sell its stake in Foodpanda to Grab, thereby establishing a quasi-monopoly because both are the biggest giants. When Grab takes over, according to the report, Foodpanda, it will set up a form of monopoly. We remember that previously when Grab absorbed Uber, eventually the cost for consumers increased and the incentives that workers previously received were also reviewed. My question, we have experienced Uber and Grab, and now Grab and Foodpanda, will the ministry plan to hold discussions so that the fate of e-hailing workers will not be affected by the establishment of this quasi-monopoly. Thank you.
Honourable Member, the ministry is ready to hold discussions with them so that we can find the best solution for them, no problem. Mr Speaker, based on statistics as at 31 October 2023, a total of 770,143 self-employed persons are actively contributing under the Self-Employment Social Security Scheme. Of that total, 194,217 persons are those who are self-employed. In addition, the Ministry of Human Resources, through the amendment to the Employment Act 1955 which came into force on 1 January 2023, introduced a presumption provision, with permission, assumption clause, namely section 101C. Through this section, the court in a prosecution proceeding may presume that there is an employer-employee relationship if there is one of the elements such as
control over the way of working, control over time, provision of work equipment, and several other elements, even without a written service contract. In addition, the Ministry of Human Resources has established a strategic partnership with the Ministry of Transport by amending the Road Transport Act 1987 [Act 333], which stipulates that contributions to the Self-Employment Social Security Scheme under Act 789 are one of the conditions for renewing vocational licences, namely the Public Service Vehicle (PSV) Licence and the Goods Driving Licence (GDL) for individuals, including within the definition of self-employed persons under that Act. This cooperation is to ensure that the rights, especially the welfare and social protection aspects of the e-hailing and p-hailing ecosystem stakeholders, including users, gig platform operator companies, drivers and couriers, particularly gig workers, are guaranteed. Mr Speaker, various efforts have been implemented to ensure guarantee and welfare for self-employed persons, including those involved in the gig economy, through initiatives under Budget 2023, namely first, SPS Padanan Caruman (SPS Matching Contribution), which is a contribution payment incentive of 80 per cent of the contribution rate, namely RM232.80, under the Second Contribution Plan. Based on statistics as at 31 October 2023, a total of 166,321 self-employed persons received benefits under the SPS Padanan Caruman Programme with government incentive payments totalling RM30.97 million. The SPS Madani Programme, which is full contribution assistance where the government provides full contribution financing, namely 100 per cent. Based on statistics as at 31 October 2023, a total of 103,031 self-employed persons...
Honourable Minister, three minutes to wind up.
Received benefits under the SPS Madani Programme with a total government incentive payment of RM24.38 million. A little more, Mr Speaker. Third, the Informal Worker Career Building Programme, including gig riders, which provides an allowance of RM300 a month for a period of three months to participants who actively undergo skills training to obtain stable employment in the formal sector. This Career Building Programme also covers training fees of RM4,000 according to certification category. Based on statistics as at 31 October 2023, a total of 13,678 applications were received and of that number, 3,648 applications have been approved. In addition, under Budget 2024 the government will improve social protection programmes to ensure that target groups continue to receive appropriate protection. The government's contribution rate under the Self-Employment Social Security Scheme will be increased to 90 per cent with an allocation of RM100 million. The government has also provided RM35 million to finance training fees and income replacement incentives for 9,000 gig workers who attend training programmes through the PERKESO Career Building Programme, to ensure that informal workers, especially those involved in the gig economy, have the opportunity to follow career development programmes and skills training in micro-credentials. Mr Speaker, finally, I thank all the Honourable Members who have raised questions and made proposals to the Ministry of Human Resources during the debate on the Motion on the Supply Bill 2024. The ministry greatly appreciates all
Mr Speaker, Minister...
Time is up. I...
I thought in my debate there was...
Duduk, duduk.
Time, time at the committee stage, yes.
I hope there will be a reply from the Minister.
Yes, yes, whatever I do not answer today...
Answer in writing.
I will answer in writing, can I? The ministry greatly appreciates all the suggestions and criticisms that have been put forward, and the ministry will take appropriate action. For questions that I do not answer orally, I will answer in writing. Thank you, Mr Speaker.
Thank you, Honourable Minister. Next, I invite the Minister of Education to answer for 50 minutes.
Thank you, Dato' Deputy Speaker. Peace be upon you, and the mercy and blessings of God. Thank you for this opportunity. Certainly the answers from the Ministry of Education Malaysia are awaited, especially since this ministry has been allocated a very large amount of funds, making our mandate and responsibility to develop education in this country very heavy, and certainly for the development of education as a whole.
Honourable Members, I have examined all the questions, views and criticisms that have been given, and it appears that questions based on development and infrastructure dominate the debate of all Honourable Members and not so much on policy. Nevertheless, I would like to begin my answer today and my explanation regarding the policies touched upon by several Honourable Members, particularly, I would like to start with the Honourable Member for Indera Mahkota, Kuala Kedah and Ledang. For the information of the Honourable Member for Indera Mahkota, KPM (Ministry of Education Malaysia) always ensures that the national education system is benchmarked against education systems in other countries. Benchmarking is carried out through participation in international studies such as, with permission, the Programme for International Student Assessment (PISA), Trends in International Mathematics and Science Study (TIMSS), and Southeast Asia Primary Learning Metrics (SEA-PLM). Participation in international benchmarking studies is very relevant in helping to assess the extent to which Malaysia's education system compares with the education systems of high-performing countries. In addition, Malaysia's participation is in line with the aspirations of Malaysia Madani, particularly in terms of the values of sustainability, well-being and creativity. KPM will continue its involvement in international benchmarking studies so that the national education system will continue to be in line with global educational developments. Honourable Member for Ledang, Kuala Kedah, are you here? No. I will continue. The Honourable Member for Indera Mahkota again and Kuantan, is Kuantan here? Yes. Raised regarding digital education in schools.
For the information of the Honourable Members, KPM continuously improves teaching and learning that makes use of technology and digital tools on an ongoing basis to enhance the quality of national education. The implementation of the Digital Education Policy will continue to support this aspiration. KPM places emphasis on digital technology, coding and computational thinking through the implementation of the Primary School Standard Curriculum and the Secondary School Standard Curriculum. Related subjects such as Design and Technology, Computer Science Fundamentals, Computer Science and Invention have been introduced to equip pupils with knowledge, skills and values that are in line with the needs of human capital development in the digital economy and the Industrial Revolution. In addition, KPM also implements digital education empowerment programmes to support the implementation of the curriculum and co-curriculum in the fields of programming and thinking, such as Minecraft competition activities, Android application development competitions, iOS App Ideation, drones and Imagine Cup Junior. Honourable Member for Seputeh, not here. Betong?...
Honourable Member, just a moment.
Please proceed, Honourable Member.
Just a moment. Two, the earlier one about policy. I agree that the ranking should be looked at, but if I may also suggest, the SDG reports should also be looked at, because the rankings we see are aimed at the high quality that we want to achieve for all pupils, but these SDG reports also contain reports about pupils who are left behind, who also want to be di- so that no one left behind. The second, on digital, yes, the budget is indeed large, but the projects, programmes or activities in schools are many. Perhaps at the Committee stage it can be determined or informed which ones are to be given priority for next year. Thank you.
Thank you, Honourable Member. I welcome your view, and the emphasis you have raised will be given attention from here on. Is the Honourable Member for Seputeh here? No. Betong? Yes, and Kubang Pasu too, yes. Good. The Honourable Member has touched on the Ministry of Education's (KPM) plans to increase students' interest in science, technology, engineering and mathematics (STEM), including increasing the proportion of students taking STEM subjects. KPM is fully committed to nurturing students' interest in STEM in order to produce an adaptive talent pool towards making Malaysia a high-technology nation, which remains a priority in line with the needs of policies related to science, technology and innovation, such as the National Science, Technology and Innovation Policy. Therefore, talent preparation covers not only students' skills and knowledge in the subjects of Science and Mathematics, but also involves technology-based and engineering subjects. Accordingly, KPM offers a choice of STEM subject packages at upper secondary level, which cover pure science, applied science, and technical and vocational education and training (TVET). The subject packages provided are intended to give students the opportunity to choose subjects that suit their inclinations, interests and abilities, and thereby encourage more students to take STEM electives. For the information of the Honourable Member, in 2022, 40.95 per cent of students chose the STEM stream package. Meanwhile, in 2023, 45.73 per cent of students chose this package. To achieve the 60:40 Policy target, KPM has
established STEM education strengthening initiatives under the Education Development Plan 2013-2025. The measures taken under the STEM education strengthening initiatives include raising students' interest in new learning approaches and consolidating the curriculum, improving the skills and capabilities of STEM teachers, raising awareness of STEM among students, parents and the public, and improving and upgrading facilities and infrastructure for STEM teaching and learning (PDP) processes. For the information of the Honourable Member, we have also reinstated the Science Practical Test for the SPM examination as a centralised examination starting in 2021, and we have also enhanced teachers' competency and capabilities in STEM-related teaching approaches. Among other things, we are expanding the concept of inquiry-based science learning, namely inquiry-based science learning and inquiry-based mathematics learning, which places emphasis on activities that are, with permission, hands-on, so that students' learning is more enjoyable and encourages students to apply the knowledge they have learned in real life.
[Bangun]
We have many other initiatives, Honourable Member, including Project-Based Learning (PBL), and integrated STEM under the STEM Project, with permission, executive consultation involving all primary and secondary school teachers. We also have the involvement of industry, NGOs and our other stakeholders, including with Yayasan PETRONAS implementing the Duta Guru programme to empower 4,500 STEM teachers in improving higher-order thinking skills through STEM education. KPM also strengthens synergy among ministries such as the Ministry of Higher Education and the Ministry of Science and Technology, as well as private agencies, to build an ecosystem for STEM education. So, we hope all parties can focus, especially on ensuring that interest and also, in the context of ensuring that the infrastructure to support this STEM culture can be fulfilled, so that we can achieve the national direction, particularly that which is closely related to STEM. Is the Honourable Member for Wangsa Maju present?
Excuse me, Mr Speaker. Excuse me, Minister.
Menteri.
Siapa tu?
Sekejap saja.
Siapa tu?
Kubang Pasu.
Kubang Pasu, please go ahead, Kubang Pasu.
Firstly, I want to thank the Minister very much for the clarification, and from what I have heard, the Minister seems very earnest in advancing STEM. However, I have a little fact, Honourable Minister. Whether the Honourable Minister agrees or not, I do not know, yes. This fact is from the Academy of Sciences. The current position is that the science stream is 15.8 per cent, and the remainder is arts, and if we do not receive this reliable data, then we may not be able to implement an effective direction. Based on my experience and also conversations with students at school, Honourable Minister, one of the reasons why students are interested in Science and Additional Mathematics is because of the teacher's teaching technique, which is effective and interesting. Ilmu Hisab in my time. Additional Mathematics. The Minister does not know this "Ilmu Hisab". In my time it was Ilmu Hisab, Mr Speaker. It is not Mathematics...
Tua dah.
What I mean is that I am quite old. You have to respect me too, right? Old. It's like this, when I was young, Mr Speaker, I liked the subject of chemistry and I was in the pure science stream at Sekolah Menengah Sultan Abdul Halim, Jenan. Why did I like Science, Chemistry, Biology and subjects like Mathematics and so on? Because I liked the teacher.
Ask any student at all, why do they like a subject? Not only because they like the teacher, but because of the way he teaches, with full feeling and earnestness, and it is easy to understand. That is the first basis, Minister. Next, I see there is a study by the Ministry of Education itself on why we have not been able to achieve 60:40, Honourable Minister, and firstly, students are not interested. We can solve that with the teachers I mentioned earlier. These teachers must undergo training and courses so that they can teach these pure science subjects effectively. Pure science means STEM A, yes. STEM category A: Additional Mathematics, Chemistry, Physics, Biology. Category B: Additional Mathematics, Chemistry, Physics and replace Biology. STEM A and B enable them to take engineering courses. If they take STEM C, they cannot do engineering degrees and cannot become scientists. So, these subjects, these teachers really must be properly trained and given courses so that they can make these students enjoy the subject. They are interested in doing it because they say, "if you do it, it looks easy, simple, but now it has become difficult, teacher." Secondly, this is the finding of a study by the Ministry of Education itself that school principals, Honourable Minister, do not really encourage their students in Form 4 to take Pure Science because they do not want the school's performance to fall, Honourable Minister. This is the finding of the Ministry of Education's study. Both of these problems must be resolved quickly. If not, we keep talking and nothing gets resolved. This is not the fault of the current Minister, he is new. It has been like that from before, but I hear that the current Minister seems earnest...
No need to debate, just the question.
It's the question he just asked. How do we – firstly, provide the best training to teachers so that they can teach in a way that makes it easy for students to understand the Science subjects, and he asked about Science subjects. Not ordinary science, pure science as I mentioned earlier. As for the others, the principals, that one, handle them, manage this problem. Thank you, Mr Speaker, thank you, Minister. I enjoyed hearing the Minister answer this.
Minister, Ledang, Ledang.
Honourable Minister...
...regarding, regarding...
Honourable Minister, I would like to remind you, Honourable Minister, 50 minutes.
Ya.
...stop giving, it is the Honourable Minister's prerogative.
Betul, betul.
...I will not stop you.
Good, thank you, because I really did want to hear the views of Kubang Pasu just now. [Applause]
Baik.
Good, I will give way to Ledang.
Related. Yes, thank you, Honourable Minister. I have debated this matter, where I asked for clarification regarding the link between the Digital Education Policy and the STEM sector. I said this, I want – I do not see that integration happening at the policy level. We want to discuss at the policy level. We say the Digital Education Policy, but where is its position in terms of this policy, with STEM? We also want to see that, at the same time, there is encouragement given, especially in schools, because I will give one simple example. In my area, at Sekolah Tengku Mahmud Iskandar. A Form 4 student with disabilities has succeeded at the Global International IT Challenge level recently in Dubai. He won the champion title for content and so on, in terms of digital. So, this means there is talent, good ability among our students that we just need to nurture and encourage more. If it is part of a policy, I think that is the best way for us to raise it further. Thank you.
Thank you, Honourable Member.
Honourable Minister, Bakri.
Shall I answer first, Bakri?
Add a little more, answer it all together.
Is it related? Okay.
Related. Honourable Minister, I have observed that when we speak about this STEM, there is apparently no guideline or syllabus that we can call uniform to be implemented in schools. Now, I see it is more a matter of ad hoc arrangements. What I mean is, if schools have teachers who are skilled in certain specific fields, what will they do? They will run programmes or activities as co-curricular activities. I see that in the market there are many vendors, many suppliers, who will provide different modules. Some emphasise coding, some emphasise assembling, what is it, robotics and so on. So, this has – as a parent whose child is still in school, it adds to my burden, and I am not quite sure whether those programmes help my child master STEM knowledge. Are they on par with or adequate for the needs of today or the future? So, does the ministry have any proposal or plan to issue a guideline, so that schools can use that guideline as a reference to prepare suitable programmes for students.
Okay, good. Thank you, Honourable Members, whose inputs mentioned just now I think are all important. I, if I may, would like to answer first, perhaps for Kubang Pasu, that the matter raised by Kubang Pasu has already become part of the focus at the Ministry of Education Malaysia. That is why Kubang Pasu just now – eh, is he no longer here? Okay, never mind, no need to answer. I will answer Ledang. [Laughter] I will answer Ledang. Ledang, I think like this, Ledang, to make it easier – but Ledang's input is important. However, I want to touch on this, Ledang. It is impossible to implement STEM without a digitalisation policy. It cannot
happen. It must have integration, it must have reinforcement, and that is what is happening now, where this integration is taking place very well. That is why Ledang, in the context of our restructuring of STEM now, we are focusing on several aspects, yes, besides interest, besides infrastructure, besides teacher competency. I would also like to touch on how much our concern this time is, as the budget mentions RM100 million for this STEM, which shows a very high commitment to ensuring that what Ledang has mentioned will certainly become reality. The key word, Ledang, is the cultivation of STEM. So, I agree when Ledang says that there are innovative talents who are sent abroad to showcase their talents. This is what we are doing at the Ministry of Education Malaysia, and we want the support of our children, to gain experience and also to create innovations based on this cultivation. To answer Bakri just now, as in my answer just now, Bakri. I have already emphasised that in the context of STEM at KPM level, we do offer packages, Bakri. That is why when Bakri says as a worried father, one moment the child buys Lego, one moment the child buys a lorry, one moment the child buys various – meaning, this material. In fact, we offer a choice of STEM subject packages, covering Pure Science, Applied Science and Technology, as well as Technical and Vocational Education and Training. So, there are many segments, which these children can choose from and show their interest, Bakri. That is why I think, Bakri, it is important as a young parent like Bakri, to ensure that the interest of these children is continuously encouraged so that their interest is sustained, yes. I also want to cite an example of how we have succeeded in implementing this 60:40 ratio in a state. I congratulate the state of Perlis, because Perlis is among the states that are ahead in ensuring that this STEM 60:40 ratio is realised.
Perlis.
Insya-Allah, we will bring it to other states in a mechanism, dynamics, looking at the development and also the support of the ecosystem in each of those states. Wangsa Maju is not here, so I will continue.
Wangsa Maju is here.
Where? Eh? Sorry, I do not see Wangsa Maju. Good, the Honourable Member for Wangsa Maju also touched on matters related to Technical and Vocational Education and Training (TVET). For the information of the Honourable Member, public acceptance of the TVET programmes offered by KPM is very positive. This can be seen through the increase in the percentage of students involved in KPM's TVET field, namely 4.60 per cent in 2019; 6.11 per cent in 2020; 6.30 per cent in 2021; 10.37 per cent in 2022; and 10.71 per cent in 2023. KPM continuously increases public understanding and acceptance of TVET, especially regarding broad and clear career pathways. Therefore, KPM has implemented road show activities and publicity across the country, intensified awareness programmes and outreach, and campaigns together with various parties to promote TVET as a first choice.
Among the strategies that have been implemented is promoting the success of KPM TVET graduates in employment or who have become high-income entrepreneurs through various social media platforms as well as print and electronic media. Second, publicising the academic articulation pathways for KPM TVET diploma graduates to the Bachelor of Technology degree level, implemented by the Malaysian Technical University Network and bachelor's degrees at other local universities.
We also, Honourable Member, are establishing collaboration with high-impact industries to provide space and opportunities for students to possess high capability and skill levels, and to meet industry demand for local manpower. I would like to record my thanks once again to all TVET children in particular, and my proud record of our TVET students whose employability rate is 98 per cent. So, this is why TVET has always been part of KPM's direction and commitment. The Honourable Member for Wangsa Maju also proposed that students be given the opportunity to explore skills fields from the early stages of schooling. For the information of the Honourable Member, students are introduced to elements of technical and vocational skills through the RBT subject as early as Year 4 in primary school. Students take the RBT subject for one hour a week at primary school level, while at lower secondary level, the RBT subject is taught for two hours a week. The implementation of hands-on activities in the primary school RBT subject is 86 per cent of the overall content of the subject's curriculum. For lower secondary, the hands-on content is 80 per cent. A focus on this hands-on content can foster students' interest in skills fields from the early stages of schooling. Is the Honourable Member for Sibu present?
Ada.
Yes, okay. The Honourable Member for Sibu raised the content of the History textbook, particularly that which involves the states of Sabah and Sarawak. For the information of the Honourable Member, the History subject curriculum was arranged chronologically, beginning from the prehistoric era until Malaysia today, while the content relating to the history of Sarawak and Sabah was arranged in parallel with the history of the other states in Malaysia, so as to create a sense of shared history among pupils towards unity, foster national integration, and cultivate appreciation of heritage and pride in the nation. The content relating to Sarawak and Sabah has been stated according to theme and title, either integrated together with the content of the history of the other parts of the country or standing alone according to the mapped titles. All knowledge relating to Sarawak and Sabah is elaborated through the political, economic, social, sociocultural, socioeconomic and sociopolitical aspects. In addition, the content relating to Sarawak and Sabah is also arranged based on the framework of world historical events and national history. So, Honourable Member, if the Honourable Member looks at the Primary School Standard Curriculum and the Secondary School Standard Curriculum, all the essence of that integration has been mapped based on the frameworks and also the essence of the histories of Sabah and Sarawak in particular. I want to stress this to the Honourable Member for Sibu, regarding the process of drafting. This is important. The process of drafting the curriculum and writing the History textbooks has gone through several processes of scrutiny and quality control by the Subject Matter Expert Panel for the History Curriculum and History Textbooks, KPM. The panel members were appointed after going through a strict security vetting process and are scholars in the field of history drawn from public university lecturers, who have been identified as having the credibility and expertise in the content of the subject. The subject matter expert panel also comprises history scholars who represent Sabah and Sarawak. Furthermore, the drafting of the curriculum and the writing of the textbooks also involved outstanding teachers and authoritative agencies from Sabah and Sarawak, including the State Government Secretary, state archives, state museums, IPG campuses in Sabah and Sarawak, and legitimate local non-governmental bodies related to the cultural and social history of the states of Sabah and Sarawak, such as historical societies.
Apart from that, the content of this textbook has been reviewed by the Textbook Quality Improvement Committee of Dewan Bahasa dan Pustaka, the External Readers Committee of Dewan Bahasa dan Pustaka and the Technical Evaluation Committee 4 of the Ministry of Education Malaysia before it was published. Therefore, Honourable Members, especially the Member of Parliament for Sibu, we went through a very long process, a very transparent one, and ensured the inputs provided in the drafting of the History textbook in particular, taking into account local expertise, especially from Sabah and Sarawak. Next, Honourable Members, allow me to proceed with the Honourable Member for Baling. Is he here? Not here. Kuala Pilah? [Laughter]
Kuala Pilah is here.
Kuala Pilah is here, thank you. Both Honourable Members have raised issues regarding the National Education Assessment System. I would like to take this opportunity to provide clarification on why assessment, the National Education Assessment System, is so important at this time and is our priority, especially in ensuring that the balanced development of our children is viewed holistically, okay. For the information of the Honourable Members, the MOE always implements improvements to the assessment and evaluation system for pupils in line with current needs. The National Education Assessment System is an assessment system introduced under the education transformation. It is a transformation from an examination-oriented system to a holistic system. So, the transformation, Honourable Member, is from exam-oriented to assessment. From the subject of Hisab to Additional Mathematics, for example. So that is what we want to see, how the transformation is no longer examination-oriented but places emphasis on holistic development and the balanced development of our children. This is important. So that is why School-Based Assessment (PBS) was introduced to shift the assessment of education from subject-based, examination-oriented to potential-based, supported by assessment. For the information of the Honourable Member, the development of pupils, we see that when PBS is introduced, it is to prepare pupils with knowledge, skills and values as a strong foundation to follow learning at the next level. In addition, the development of pupils in aspects of sports, co-curriculum, noble values, interests and inclinations, as well as the formation of character can be enhanced through PBS. This is in line with the MOE's aspiration to emphasise aspects of human dignity (karamah insaniah) or human dignity through the cultivation of adab, akhlak and integrity. Honourable Members, I want to stress that through the implementation of PBS, the diversity of potential...
Honourable Minister, Sik would like to ask a question related to...
Oh, Sik. Please.
School-Based Assessment and the main objective of upholding the value of human dignity. I am confident that the programme currently being implemented in schools, the Palestine Solidarity Week, is part of our agenda to develop the humanitarian values of students. My question to the Honourable Minister, I read today's news report, and the Honourable Minister said that there are parties who caused disruption to this Palestine Solidarity Programme. I want to ask, who are they, Honourable Minister? Tell us which party is disrupting the programme, which I am confident the entire population, both Muslims and non-Muslims throughout Malaysia, continues to support in our efforts to help
or show solidarity with the children in Palestine who are being brutally killed there. So, if there are perhaps Honourable Members in this House who are trying to disrupt this solidarity programme, we Members of Parliament on this side will defend it and ensure that this programme continues to run well, without being disrupted by any party. Thank you, Honourable Minister.
Thank you. Mr Speaker, actually, the answer on Solidarity Week, I have it in another section. I seek permission to answer that together with the segment in my answer relating to Solidarity Week, so that I can first finish the issue of assessment.
Sik, I am not trying to evade that question. I will not evade it. But I need to first finish the matter of assessment to be fair to my colleagues who have already raised their questions and concerns about PBS. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Sitting] PBS is even more important, yes, to ensure that the overall development of our children is viewed fairly, moreover the abilities of these pupils are recognised, especially those who have high creativity, can be honed as proposed by Ledang to take part in innovation competitions. Meanwhile, pupils who are skilled in creating works can be brought forward for arts competitions. The implementation of PBS does not only fulfil the aspirations of the National Education Philosophy and the Malaysia Education Blueprint 2013-2025. But I want Honourable Members to take note of this matter because this is why, apart from the aspirations of the National Education Philosophy and the Blueprint, we also have a commitment that is in line with the Incheon Declaration Education 2030, which encourages countries to provide inclusive, equitable, quality education and lifelong learning opportunities for all. This system also adopts assessment approaches implemented in Finland and Sweden in developing the potential of pupils comprehensively. So, as part of the International Education Community, the MOE is committed to the Incheon Declaration Education 2030 to focus on the provision of inclusive, equitable, quality education and lifelong learning opportunities. Therefore, the implementation of PBS can prepare pupils to meet current needs through a more holistic assessment, namely pupils becoming more creative, innovative and understanding their own abilities as envisaged in the National Education Philosophy. For the information of the Honourable Member for Baling and also Kuala Pilah, right? In fact, the implementation of engagement sessions related to PBS has already been carried out throughout the country and has received participation from all stakeholders closely related to the PBS issue. As a result of these engagement sessions, through the conduct of conventions, several important contributions and important emphases have been made in the national education ecosystem and on what the MOE needs to improve and add value to in streamlining the direction of PBS. Important resolutions and the engagement conventions are being studied and refined by the MOE to be made into a stronger policy to support efforts to develop the best education ecosystem in schools. There is also a question, closely related to this issue, namely regarding the selection of pupils for admission to special schools, yes. The MOE has introduced a standard assessment, namely the Special School Admission Assessment, which is conducted centrally. Special schools cover admission to fully residential schools, national religious secondary schools, technical secondary schools and vocational colleges under MOE management. Technical secondary schools and vocational colleges under our management, as well as the Royal Military College under the management of the Ministry of Defence Malaysia. Apart from pupils achieving the PKSK tolerance level set, admission, yes. The admission assessment that is set, there are other components used in determining merit for admission selection to SBP, namely Classroom Assessment, Physical Activity, Sports and Co-curriculum Assessment and Socioeconomic Status. Therefore, this assessment is holistic in determining the potential of the pupils selected for admission to Form 1 and Form 4 in SBP. In addition, the offer of admission of pupils to SBP gives priority of 60 percent to pupils from B40 families. Honourable Member for Indera Mahkota once again, as well as Kangar. Is Kangar here? Is Kangar okay there? Is Kangar sleeping? Kangar, are you okay?
standard, namely the Special School Admission Assessment (PKSK) conducted centrally. These special schools cover admission to fully residential schools, religious national secondary schools, technical secondary schools and vocational colleges under the management of the Ministry of Education (KPM). Technical secondary schools and vocational colleges under our management, as well as the Royal Military College under the management of the Ministry of Defence Malaysia. Apart from pupils achieving the PKSK tolerance level set, admission, yes. The admission assessment set out, there are other components used in determining merit for selection into SBP, namely Classroom Assessment, Physical Activity, Sports and Curriculum Assessment, and Socio-Economic Status. Therefore, this assessment is holistic in determining the potential of pupils selected for admission into Form 1 and Form 4 at SBP. In addition, the offer of admission of pupils to SBP gives priority of 60 per cent to pupils from B40 families. To the Honourable Member for Indera Mahkota once again, as well as Kangar. Is there Kangar? Is Kangar alright there? Is Kangar sleeping? Is Kangar okay?
Okey.
On the aspect of co-curriculum. [Laughter] For the information of the Honourable Member for Indera Mahkota, the MOE always monitors and ensures that co-curricular activities are strengthened in line with mainstream developments and are appropriate to the goals and the National Education Philosophy. The core of it, Indera Mahkota, the core of education is always the National Education Philosophy. Among the efforts to strengthen co-curriculum is through learning methods that are formal or informal and contain inquiry, with respect, edutainment, and also fun learning, with respect, educate and entertain. For the information of the Honourable Member, the MOE's co-curriculum policy stipulates that the participation of all pupils in co-curricular activities in government and government-aided schools is compulsory. So, co-curricular activities cover sports and games, associations and clubs, as well as uniformed body units. I am sure that Indera Mahkota's concern is about three. Why three? Let me explain, Indera Mahkota. When we develop, when we talk about the more holistic development of pupils, this matter is also to provide space and opportunity for our children in all segments, on all stages, and ensure they get the same space. So, that is why we give everyone space to be in these co-curricular activities, sports and games, associations and clubs, as well as uniformed body units, and ultimately, in these processes, their potential will be seen, in the context especially when we move towards that holistic development. This space and opportunity are very important for our children so that they can participate fully in all the spaces that develop their potential holistically. Please, Indera Mahkota.
Thank you, Honourable Member. I have no issue with those three areas. However, my question is, is there any possibility for certain students. For example, a successful athlete who represents the state or represents the country, must he still be required to take all three of those areas.
[Bangun]
Is it not possible to have a more creative approach, where even though he is only in sports, he can still obtain the elements and values found in the other two areas because of those demands. Likewise, perhaps someone who is truly in science, in the Science Society, has reached the level where he is almost like a researcher. So, he can still obtain the others from those two other areas, even though he is in only one area. It is not, it does not become a new policy. But, what I mean is, that flexibility should be given to accommodate his expertise in a particular area. Thank you.
Terima kasih.
Can Kangar add a little? The same issue. Okay, thank you, Mr Speaker and also the Honourable Minister. Okay, regarding those three areas just now, for co-curriculum, it certainly looks very nice on paper? Yes, all students must be involved. There are students over there now. Watching. [Pointing towards the public gallery] So, what is certain is that at the implementation level, the implementation level sometimes does not run. If it is all three, sometimes perhaps one runs or two run, one does not run. It becomes, I see this from the theoretical side. From the implementation side, it is different. So, if possible, I would like to ask that perhaps as Indera Mahkota said just now, if a student is involved in sports, perhaps we focus on sports. Or if someone who is involved likes drill, focus on drill. Then, they will get it. They will get what they want. Sometimes they do not get it. After school, cannot do drill. Can ask about that. [Pointing towards the pupils in the public gallery] After drill, after school, cannot do drill. We who have been involved for a long time still remember the commands, the commands in drill until now. Thank you.
Okay. Thank you, Honourable Member...
Minister. Minister's addition.
Siapa ini?
Hulu Terengganu. In front here.
Oh, I cannot see. Okay.
So high, you cannot see? Thank you, Minister. Regarding co-curriculum. I am a former teacher. Now we are in the digital world. Are there any proposals from the ministry to include eSports as one of the co-curricular components? Second, is there any assistance for those who, as Indera Mahkota said just now, have already represented the country. The best example now is Johan Ghazali, a child of Sarawak. Is there any assistance or contribution that can be channelled to this student who has brought the name of the country to the world. Thank you, Minister. Thank you, Mr Speaker.
Thank you to all three Honourable Members who raised those views. I think these views are very important. I think like this, Indera Mahkota, Kangar. What is important is opportunity. That means, the entry point is that we give opportunity equally and then we celebrate that distinctiveness. So, if they choose sports, they choose arts and so on, then that is the distinctiveness that will be strengthened and will be given focus. The next Honourable Member, who asked about what incentives, perhaps that is the question? Or the...
eSport.
Untuk eSport.
One eSport. The second, incentives.
eSports have indeed been within the scope of sports that are given attention by the Ministry of Education Malaysia. We have that segment in the development of our sports, which we are looking at as a whole, and in relation to incentives, there have always been, and it is not only us, meaning it cuts across ministries, indeed my colleague the Ministry of Youth and Sports also provides a lot of support to our students, especially in developing the potential of members.
Sports also provide much support to our students, especially in developing the potential of members.
Honourable Member, although I am not handsome, please answer my question. I am waiting for the maintenance, yes. Thank you. [Laughter]
Okay, okay. Thank you, Honourable Member. I have to finish the policy first, Honourable Member. The Honourable Member for Kangar has also proposed that the MOE pay attention to adding value to pupils in the International Programme, and the MOE is always striving to add value to pupils by providing opportunities to get involved in various international activity programmes. So, Honourable Member for Kangar, there are indeed many programmes implemented by the MOE for the year 2023 alone. For example, Honourable Member, the Youth International Science Fair held in Bali, Indonesia, the Regeneron International Science and Engineering Fair held in Dallas, United States of America, the International Mathematical Olympiad held in Chiba, Japan, and many other competitions in which the MOE has been directly involved at the international level.
Once again, Honourable Minister. I propose that the Ministry of Education give, for example, mandatory status to schools to hold international programmes. I propose it. If possible. Because...
Can propose, not necessarily accepted. Okay, good. Thank you. [Laughter]
If they want to accept it, accept it. I am just giving a proposal.
Next, Mr Speaker. Okay, thank you, Honourable Member. The Honourable Member for Indera Mahkota, Semporna. Is Semporna here? Kuala Kedah? Kuala Kedah and Kuala Krau, are they here?
Kuala Kedah is here.
The matter of skills and competency among teachers or education service officers. For the information of Honourable Members, the Ministry of Education Malaysia (KPM) is always alert to changes in the environment that require improvements to the education system, so as to ensure students' success in leading economic development and the future global world. On the development of digital skills among teachers, as raised by the Honourable Member for Indera Mahkota, the Digital Education Strengthening Programme under RMKe-12 is KPM's effort to enhance, while also empowering, educators and education leaders, to integrate digital technology into the education ecosystem. Teachers are given continuous training and guidance in supporting the implementation of current education policies, including improving knowledge and skills in digitalisation of education so as to meet the education system of the 21st century. The strategies that we have already implemented through this programme are the implementation of digital competency mastery assessments based on each person's career path. We have carried out assessments of digital competency levels, and the purpose of these assessments is to identify the digital competency levels of teachers and education leaders, and then to carry out suitable training to raise each person's level of mastery or digital competency. For the information of the Honourable Member as well, we have set up the Jauhari Digital team, consisting of teachers and education administrators who have mastered certain levels of competency in the digital field.
For the information of Honourable Members as well, in the context of career development, KPM also provides opportunities for teachers to attend short-term, medium-term and long-term specialised courses, whether inside or outside the country. In addition, KPM always encourages teachers to continuously improve their skills, including pursuing studies to higher levels, by offering various incentives. One of them is the Federal Training Award offered to eligible teachers to pursue master's and doctoral degrees. The Honourable Member for Kuala Kedah has raised the matter of training received by prospective teachers. KPM is always capable and ready to prepare groups of trained and competent teachers through the Bachelor of Education Degree Programme, the Postgraduate Diploma in Education Programme and the Diploma in Education Programme. For the information of Honourable Members, there are 25,586 students currently pursuing studies, with a total of 2,213 lecturers. Once again, Honourable Member, I would like to record my thanks to the Honourable Member for Igan, who has consistently raised issues about the shortage of teachers in KPM schools. Honourable Member for Igan, Rasah. Is Rasah there? Batang Lupar?
Ada, ada.
...and Kuala Pilah, who has been very committed in highlighting the issue of the shortage of teachers in KPM schools. Based on KPM data, as of 30 September 2023, the total number of teacher posts for KPM schools is 431,229, with 410,366 filled. For the information of Honourable Members, the number of vacant teacher posts in KPM schools is dynamic and will change from time to time, and it is temporary, due to teachers leaving the system such as through retirement, transfer, death, resignation and so on. These vacancies will be filled through new appointments based on the number that has been identified. The Honourable Members for Rasah and Batang Lupar have requested that KPM take immediate steps to address this issue of teacher shortages. For the information of Honourable Members, the recruitment of teachers for 2023 is being carried out by the Education Service Commission (SPP). I am pleased to announce that SPP has issued a statement today that teachers have already – will receive results regarding their applications, starting tomorrow on the SPP website, yes.
The Honourable Minister.
...where the results relating to their interviews, which will fill the vacant teacher posts, total 9,552, and they will receive their results starting tomorrow. Yes, please.
[Bangun]
Serian. Thank you, Honourable Minister. In the debate, I raised three issues. Among the issues I raised, and I request, is an allocation for PIBG to help schools in carrying out co-curricular activities. In Sarawak especially, in the interior of Sarawak, I think throughout Malaysia as well, rural and interior schools, most PIBG would like to help the school with permission, but there is no money. Also the parents are poor. So, will the ministry take care of this problem and include this in the 2024 allocation?
Alright. Thank you, Honourable Member. I believe the answer to the Honourable Member's question has already been prepared, but because I have not yet finished the policy part, yes, Honourable Member. Let me– give me space to finish the policy first. Just a little more.
YB Menteri.
So that is it, Honourable Member. KPM will resolve this issue of teacher supply for new appointments.
[Bangun]
[Bangun]
SPP has already certified just over 9,500 through tomorrow, and we hope that from time to time, through our approach and synergy with SPP, the issue of teacher shortages can be addressed from time to time.
The Honourable Minister.
Honourable Members, Rasah also proposed that KPM hold engagement sessions with stakeholders to address the long-term issue of teacher shortages, and we have already implemented this, Honourable Members. Among other things, we have established the Teacher Recruitment and Placement Committee at KPM level. In addition, we are also involving our partners from the Ministry of Higher Education, to ensure that the direction of teacher education and teacher projections can be implemented according to the actual needs of KPM schools. The next one, Honourable Member.
I give an additional 10 minutes.
Terima kasih.
Yang Berhormat.
The Honourable Minister.
Honourable Member, if not, I will not finish this, I have to finish first. Give me space. I thought for 10 minutes there was no need to interrupt again.
Yang Berhormat.
Whatever I cannot answer, I will follow up with a written reply, all right? Alright.
Deputy Speaker, Honourable Member, I am waiting for an answer about maintenance...
I want to continue.
...namely DE 5.93 million.
Baiklah.
So, I did not touch on the policy earlier. Because this is a large allocation that we approved. I just want to ask one question. This RM5.93 billion. RM1 billion has been set aside for maintenance of educational institutions. I find that this RM1 billion includes RM100 million for maintenance of computer laboratories, including providing equipment for STEM. Eh? What heading is this? It has never been like this since 2009 until today, it has never been mixed together like rojak. Second, RM60 million for quarters maintenance. This is unfair to the ministry. I fought for the Education Ministry and only RM840 million remains. From this information, school and non-school maintenance is RM670 million. Schools RM565 million, non-schools RM25 million, slopes RM15 million, and disasters and emergencies RM65 million.
This method is different from the previous items. It was never mixed together all in one before. It is not right. Look back at Item 04600. [Applause] The new STEM policy must have an allocation. It cannot take from schools. This is unfair to Members of Parliament. Because we fought, we wanted to approve RM1 billion, so let it be RM1 billion for schools, 10,000 schools. So, I want to ask why RM1 billion became RM565 million? This is for the good of us all, firstly. Secondly, if STEM is a new policy, there must certainly be an objective for the new policy. Why must it be taken from this pitiful fund? RM1 billion? In the Putrajaya era, over two years we received RM800 million, RM900 million, and they described which types of schools would receive it. But this time only RM565 million remains, with no increase. So, this is why we are waiting, patiently waiting to ask whether it is a mistake by the Ministry of Finance? I have never seen it. Previously, if I looked at speeches, I did it, yes. [While showing a copy of a document] From 2008, the announcement of 2 November until today, I made a summary, it has never happened like this. All schools, for example in 2013, RM400 million...
Ayer Hitam, if you want to debate the details, wait for the Committee stage. We want to hear the Minister first.
...national schools, while the other schools, SJKC and SJKT, RM100 million, all clearly stated. The Honourable Member for Bagan also mentioned how much each school received. But this time, how did a big RM1 billion like this end up with only RM565 million? Was it a mistake? I do not know which mistake it is, or was the Minister bullied? I support the Minister taking back that RM1 billion, because it is for our constituencies. RM800 million, RM900 million suddenly became RM565 million. I think this is not an increase. That is something we must fight for together. I support the Education Ministry getting that back. Thank you. [Applause]
The Honourable Minister. If I may, briefly, Ayer Hitam. Ayer Hitam mentioned my name earlier. That is why in the Dewan sittings, I have asked many times that this maintenance allocation needs to be explained, transparently. I still remember, at that time we introduced a formula and that formula was clearly debated here at length. Some tried to raise it as if the formula had racial elements. I said, show me where? There is none. It was based on the number of schools, based on certain percentages, and we presented that amount. So, that is a clear approach. So, we have asked many times before and the answer was that we follow needs. Yes, following needs, but there are divisions that make it easier for us to monitor whether they are within the framework that has been set. So, if possible this time, please explain how much was actually given and what approach or formula was used? What is most important is that this maintenance must be viewed in a very broad context. We have more than 10,000 schools across the country. In the past, if RM500 million was too small, I remember RM1 billion or at that time RM800 million, RM900 million was still too small compared to more than 10,000 schools across the country. Thank you.
Thank you, Honourable Members, for providing your views and also your concern about how the overall distribution of this maintenance allocation is made. I would like to emphasise this, Honourable Member. The detailed distribution of the maintenance allocation that has been planned at this time is as read and referred to by the Honourable Member. However, the breakdown
of this maintenance allocation is still at the stage of internal discussion within KPM. That means there is room for us to hear and take the Honourable Member's views, for us to see how the breakdown of this maintenance allocation is still at the discussion stage. Nevertheless, this is very important. Nevertheless, this maintenance allocation will be distributed based on certain mechanisms. Some are based on applications, and at the same time, a need-based formula. This need-based formula remains the principle of the Ministry of Education Malaysia. That is why we look at these maintenance issues, which must be distributed fairly and appropriately, looking at the importance and also the maintenance, including the importance and needs of each school.
Honourable Member, I think in the emergency earlier, RM65 million actually cannot be included. Because there is a Cabinet decision from 2015. At that time there was the major flood of 2014, and it gave SJKC RM16.5 million. Later the Cabinet instructed the ministry again to give back RM50 million, because that is what was allocated. So, in this case, slopes must not be included, quarters must not be included. Take another place. But this is for 10,000 schools. Schools.
Alright, we will take note.
It is not for quarters. That is why I said, I support the Honourable Member going back to get these 10,000 given to all schools, that is what it means. Thank you.
[Laughter] Need-based, Honourable Member, need-based. Thank you. Honourable Members, next is what was also raised by the Honourable Member for Igan, Lubok Antu, Batang Lupar and Betong. They proposed that KPM appoint more children of Sarawak and Sabah who are university graduates to become teachers in their respective districts. KPM welcomes this proposal and always welcomes this proposal. The recruitment of teachers is carried out every year through recruitment advertisements by SPP, as the appointing authority. For the information of Honourable Members, the number of teachers born in Sabah who serve in state primary schools is 23,482, which equals 90.46 per cent. The number of teachers born in Sabah who serve in secondary schools reaches 87.76 per cent. The number of teachers born in Sarawak who serve in state primary schools in Sarawak is 90.90 per cent. Meanwhile, the number of teachers born in Sarawak who serve in secondary schools in the state is 85.95 per cent. So, regarding returning— congratulations to Sarawak and Sabah for maintaining that projection and ensuring that children born there continue to serve in their respective states. Regarding the proposal to bring back teacher recruitment through holiday courses, the Graduate Programme or Interim Teachers. As raised by the Honourable Members for Igan and Betong, KPM once implemented the appointment of Untrained Relief Teachers or Interim Teachers. However, starting in 2020, the appointment of teachers through contract of service appointments was implemented to replace that method. In line with the Public Officers (Regulations) 2012. The contract of service teacher appointment method, Honourable Member, is better. It is better for ensuring welfare and is more orderly because COS teachers are categorised as civil servants and are eligible to receive salaries, allowances and facilities the same as permanent teachers. Honourable Members, I have about four minutes left. I would also like to touch briefly on what was raised by the Honourable Member for Jerai. Is Jerai here? Jerai is not here. Alright, I want to answer briefly about what was raised by my colleague Sik a moment ago.
When he touched on the implementation of the programme, especially that closely related to the Palestine Solidarity Week. [Holding back tears] Humanitarian compassion is the main reason why KPM wants to take part in implementing this Solidarity Week. [Applause] Children, Honourable Member. Children who are exposed to a thousand and one emotions need guidance and direction in navigating emotions in a more noble direction. This is not a matter of who is more Palestinian, this is not a matter of who yields to shallow pressures that choose between two humanities. This is not that.
Therefore, Honourable Members, KPM answers the call of the Honourable Prime Minister and the stance of the Government of Malaysia to stand together in defending the rights and freedoms of the Palestinian people. So, the purpose of this programme is to educate students on human values, humanitarian values, peace education and also harmony. Give us space, the Ministry of Education, to carry out our responsibilities and prioritise this humanitarian education process. Do not disturb us, do not touch our schools. [Applause] Do not touch our teachers, whether here or there, the same. Do not touch! Give space to this education as a process. Understand it as an important message for educating humanity. That is why, gentlemen and ladies, I take in all views, I listen to all criticism. Suggestions, among others including friends from the Christian Council who suggested that this Solidarity Week be filled with prayers according to each religion. I accept this and there are schools that have carried out such programmes. So, that is why, do not disturb this school ecosystem. Schools are dynamic in nature. There are various races, various beliefs, various backgrounds. This dynamism is only for teachers to identify which programme is suitable. That is why do not make noise, do not worry if schools do not have takbir, no Qunut Nazilah, there is a reason why it takes place in an atmosphere and activities that are permitted and appropriate for that school. That is why, Honourable Member, what is important at this time is that the education message, the humanitarian message must get across. The message of peace must get across and universal harmony must get across. Our students, do not underestimate them. They have global citizenship across the curriculum. For this reason, yes, education must begin with these strong messages, so that they can be in an ecosystem that will be able to defend and prepare them with the issues that revolve around them. Honourable Members, I...
[Bangun]
[Bangun]
...Very pleased to see this programme running very well. This morning I managed to stop by a school. Tomorrow night at a Chinese school in Seremban, the day after at a school in Putrajaya, which indeed welcomed the statements and suggestions from all levels of society, NGOs and so on. I am confident that behind the views and suggestions given, the main message and aspiration regarding peace...
[Bangun]
...Humanity, justice and unity this...
Minister, before time runs out...
...Becoming the focus of all parties, in line...
The Honourable Minister
... With the Government's stance. Thank you.
A little, a view from Sik. A little.
The Honourable Minister.
The Honourable Minister, a little more. The Honourable Minister. [Applause] Just a little.
Why are you so afraid of Qunut Nazilah and takbir, Honourable Minister?
The Honourable Minister...
Thank you, Honourable Minister of Education. Next, I invite...
A mistaken applause just now.
The Minister of Health to respond.
Thank you, Mr Speaker. Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh, peace and greetings, and greetings of Malaysia Madani. Mr Speaker, today I am a little different. I want to begin with a pantun.
Silakan.
Not just any bee, A bee that nests in the cool shade of a tree. Not just any verse, A verse that holds guidance for life.
Ya.
First of all, I would like to extend my thanks a thousand times to the 44 Honourable Members who took part in the debate at the policy stage on the Appropriation Bill 2024 and raised 76 issues relating to the Ministry of Health Malaysia (KKM). I would like to express appreciation to all the Members of Parliament who posed questions and also provided input, namely Bakri, Balik Pulau, Baling, Bandar Kuching, Bangi, Baram, Batang Sadong, Batu, Batu Pahat, Beluran, Bentong, Jelutong, Jempol, Kota Belud, Kota Marudu, Kuala Langat, Kuala Nerus, Kuala Pilah, Kuantan, Kudat, Kulim-Bandar Baharu, Larut, Puncak Borneo, Putatan, Sandakan, Selangor – Selangau, sorry. Semporna, Setiu, Sibu, Subang, Sungai Petani, Tanjong Karang, Tanjong Piai. There are more. Betong, Gerik, Igan, Ipoh Barat, Libaran, Maran, Parit, Pokok Sena, Tawau, Tenom and also Tumpat. Mr Speaker, I would like to extend my thanks a thousand times to the Right Honourable Prime Minister, who is also the Minister of Finance, for providing the largest development allocation in the history of the Ministry of Health Malaysia. This demonstrates the Government's commitment to the health sector in Budget 2024 to ensure the well-being of the Malaysia Madani people in an inclusive and holistic manner. Budget 2024 allocated a total of 41.22 billion compared with 36.33 billion in 2023, an increase of 13.45 per cent or 4.89 billion. Of that total, 31 – 35.15 billion has been allocated for operating
expenditure, an increase of 3.65 billion or 11.6 per cent compared with last year, and 6.07 billion has been allocated for development expenditure, an increase of 1.24 billion or 25.7 per cent compared with 2023. The allocation provided to the ministry is 10.4 per cent – 10.47 per cent of Budget 2024, and this also shows that the Government is committed to improving the health and well-being of the people through better healthcare services that are also equitable, sustainable, resilient and responsive. This increase is also a positive development towards realising the recommendations of the Health White Paper – Projection of the Health White Paper, that the health sector budget be increased towards five per cent of the national GDP. Mr Speaker, through the budget of this ministry, the ministry will intensify the cultivation of healthy lifestyles and early disease prevention by allocating at least 130 million through the Malaysia Healthy National Agenda, the Cervical Cancer Screening Programme, the Thalassaemia Screening Programme for adolescents in Form 4 and Form 6, aged – Form 4 students aged 16, and the Early Detection Programme for Hearing Problems and Congenital Heart Disease among newborn babies, and the free provision of pertussis vaccines to all pregnant women. Continuing the Madani Medical Scheme to improve access for low-income groups to primary healthcare for acute illnesses, with an allocation of 100 million, which is expected to benefit 700,000 families. Also, continuing the digitalisation of the health system with an allocation of 326 million, including 150 million to provide the Clinic Management System Subscription (CMSS) at 100 health clinics, including village and community clinics. The ministry will also continue upgrading and rehabilitation works for health facilities, including 400 dilapidated clinics with an allocation of 300 million, and allocate 766 million for the procurement of medical equipment and ambulances, including through leasing. Under the Fourth Rolling Plan of the Twelfth Malaysia Plan, several projects have been approved, including preliminary works for Hospital Sultanah Aminah 2 in Johor Bahru and the construction of an additional pathology block at Hospital Perempuan Zainab 2, Kota Bharu. In addition, five health clinics will also be built, namely a Type II Health Clinic for Rantau, Negeri Sembilan; a Type V Health Clinic at Kuala Tahan, Jerantut, Pahang; a Type V Health Clinic at Kuala Jengal, Dungun, Terengganu. We do not discriminate, okay. A Type VII Health Clinic at Pulau Mantanani, Kota Belud, Sabah; a Type III Health Clinic at Hutan Melintang, Bagan Datok, Perak. Mr Speaker, for this winding-up, I would like to focus on issues relating to health policy, and for questions involving local issues, I will try to answer them in writing. I will also divide this winding-up speech into several main focus areas, namely: (i) the strategy of the Ministry of Health; (ii) human resources; and (iii) an issue that is quite important, namely mental health. If time permits, I will answer issues relating to equipment and supplies, proposals for building new facilities, proposals for building existing health facilities, and also existing construction and upgrading projects. Mr Speaker, prevention is better than cure. In this regard, I would like to remind the Honourable Members and all Malaysians to practise a healthy and balanced diet, be physically active, manage stress well and cultivate a healthy lifestyle.
I urge all Malaysians to undergo health screening regularly so that risk factors can be identified and early prevention can begin before the disease becomes more severe. I would like to refer to the question from the Honourable Member for Ipoh Barat. Is the Ipoh Barat Member here? No? But I will still answer, Mr Speaker, regarding the absence of the statement "prevention is better than cure" in the ministry's vision and mission statement. I do not really agree with that statement. For the information of the Honourable Member, although it is not expressed explicitly in the vision and mission statement, the ministry has outlined a major agenda under the second pillar of the Health White Paper, namely strengthening health promotion and disease prevention. In addition, the priority of the preventive aspect is also outlined implicitly in the National Strategic Plan for Non-Communicable Diseases (NCD) for 2016 to 2025. Through this Strategic Plan, various programmes and activities are implemented, including health screening, the Healthy Community Programme Nation Builders (KOSPEN), advocacy on healthy eating through various channels, and also the Madani Afiat Programme to disseminate prevention information in the treatment of NCDs. In this regard, the ministry welcomes the announcement by our Right Honourable Minister of Finance to channel the proceeds from the excise duty on sugar-sweetened beverages, which has been raised from 40 sen to 50 sen per litre, specifically to address and treat diabetes, including support for dialysis centres. As suggested by the Honourable Member for Kuala Langat, this allocation will be used well to implement promotion and prevention activities. On the same matter, the Honourable Member for Puncak Borneo has suggested that roadshows or jerayawara on health awareness be enhanced and that volunteer First Aider teams be established and trained in CPR techniques as well as AED equipment. For the information of the Honourable Members, several scheduled health awareness activities with the community in the Puncak Borneo constituency have been carried out by the ministry from the beginning of 2023 until 21 October recently, namely the Townhall Programme with the community, including health screening and a health exhibition involving one locality. Then, the outreach activity of the Malaysia Healthy National Agenda has also been carried out through the Wellness on Wheel service involving one locality, outreach activities on awareness of rabies and malaria in 21 localities. Outreach activities on the prevention of dengue fever in three localities, and including activities to strengthen health literacy through public awareness campaigns and the distribution of health education materials in every locality involved. For the information of the Honourable Member, a total of 106 CPR training programmes and 72 AED equipment usage training programmes were organised from January to September 2023 through the KOSPEN programme, and during that period, a total of 2,173 community volunteers underwent this training, CPR training. Then 1,437 community volunteers were trained in the use of AED equipment. The ministry welcomes cooperation through strategic partnerships between non-governmental organisations (NGOs), community leaders and local community heads, including the involvement of the media and so on, to further intensify such programmes. Mr Speaker, the Honourable Member for Balik Pulau? The Honourable Member for Balik Pulau touched on addressing the stress test on the national health system. Actually, for the information of the Honourable Members, the COVID-19 pandemic has truly tested the capacity and response of the healthcare service delivery system in Malaysia. In our country and also abroad, indeed globally. Among the weaknesses identified was legacy issues in the health service system. This was compounded by the unexpected situation, an unprecedented situation during the COVID-19 pandemic, as with most other countries, but it was handled as well as possible at the time through various methods and approaches. Improvement actions that need to be taken include health facility premises that could not accommodate the need for admitting too many patients to hospitals. The capacity of equipment that needs to be enhanced, such as oxygen tanks, including ventilators, PPE, medicines and others. The number of healthcare workers also needs to be increased. Strengthening the use of technology and digitalisation and the health system
Mr Speaker, regarding the absence of a statement that prevention is better than cure in the ministry's vision and mission statement. I actually do not really agree with that statement. For the information of the Honourable Member, although it is not expressed explicitly in the vision and mission statement, the ministry has outlined major agendas under the second pillar of the Health White Paper, namely enhancing health promotion and disease prevention. In addition, the priority of prevention aspects is also outlined implicitly in the National Strategic Plan for Non-Communicable Diseases (NCD) for 2016 to 2025. Through this Strategic Plan, various programmes and activities are implemented, including health screening, the Healthy Community Nation Builders Programme (KOSPEN), advocacy for healthy eating through various channels, and also the Madani Afiat Programme to disseminate prevention information in the treatment of NCDs. In this regard, the ministry welcomes the announcement by our Honourable Minister of Finance to channel the proceeds from the excise duty on sugary drinks, increased from 40 sen to 50 sen per litre, specifically to address and treat diabetes, including support for dialysis centres. As suggested by the Honourable Member for Kuala Langat, this allocation will be used well to carry out promotion and prevention activities. On the same matter, the Honourable Member for Puncak Borneo has suggested that roadshows or outreach on health awareness be enhanced and that volunteer First Aider teams be established and trained in CPR techniques and AED equipment. For the information of the Honourable Members, several scheduled health awareness activities with the community in the Puncak Borneo Parliamentary constituency have been carried out from the beginning of 2023 until 21 October recently by the ministry, namely the Townhall Programme with the community, including health screening and a health exhibition involving one locality. Then, the Outreach activity under the Malaysia Sihat National Agenda was also carried out through the Wellness on Wheel service involving one locality, outreach activities on rabies and malaria awareness in 21 localities. Outreach activities on dengue prevention in three localities, and including activities to strengthen health literacy through public announcements and distribution of health education materials in every locality involved. For the information of the Honourable Member, a total of 106 CPR training programmes and 72 AED equipment usage training programmes were organised from January to September 2023 through the KOSPEN programme, and during that period, a total of 2,173 community volunteers underwent this training, CPR training. Then 1,437 community volunteers were trained in the use of AED equipment. The ministry welcomes cooperation through strategic partnerships between non-governmental organisations (NGOs), community leaders and local community heads, including the involvement of the media and so on, to further intensify such programmes. Mr Speaker, the Honourable Member for Balik Pulau? The Honourable Member for Balik Pulau has touched on addressing the stress test on the national health system. Actually, for the information of the Honourable Member, the COVID-19 pandemic has truly tested the capacity and response of the health care delivery system in Malaysia. In our country and also abroad, globally. Among the weaknesses identified were legacy issues in the health service system. This was compounded by unexpected, unprecedented situations during the COVID-19 pandemic, as in most other countries, but it was handled as well as possible at that time through various means and approaches. Improvement measures that are needed include health facility premises that could not accommodate the admission of too many patients at hospitals. The capacity of equipment that needs to be enhanced, such as oxygen tanks, including ventilators, PPE, medicines and also others. The number of health workers also needs to be increased. Empowering the use of technology and digitalisation and the health system
that needs to be more resilient to face the pandemic situation. This situation is clear...
Yang Berhormat Menteri, may I interject briefly?
Just a moment, a little more. This situation has clearly shown that there is a need to further strengthen the healthcare system to ensure that the people have equitable access to resilient healthcare services, namely resilience, and also smooth, in seamless. Please.
Thank you, Mr Speaker. Thank you, Honourable Minister. I was interested when the Honourable Minister mentioned the use of technology just now. Previously, as the Honourable Minister mentioned, we faced problems during COVID-19 and we introduced MySejahtera. As far as I am aware, the contract for MySejahtera has already ended and I am rather worried about its data. So, I request an explanation from the Honourable Minister: if we want to move forward using more advanced data and IT systems, with the CCMS to be introduced after this, what has happened to the MySejahtera data? Has it now become fully owned by the Government? That brings me to the next problem. There is a report in Harian Metro dated 25 October 2023 which says that this CCMS was developed by a company based in the United Kingdom. So, my slight concern is what will happen to that data? How can we ensure that it is secure, will not be leaked, and that the ownership is also owned by our Government? I understand there was also an increase in cost when switching from TPCOC to CCMS in terms of monthly cost, monthly rental. So perhaps this can be clarified by the Honourable Minister. Thank you, Mr Speaker. Thank you, Minister.
Honourable Minister, may I interject briefly? Balik Pulau. On the same issue. Just now, the Honourable Minister, I examined the answer on the stress test for our health system, and it was stated that COVID-19 was a form of test. So, I am sure the ministry has several measures or action items, weaknesses from that test just now. What measures do we take to address the occurrence of such a pandemic?
Thank you, Mr Speaker. Thank you, Honourable Member. Answering the Bukit Gelugor Member on the use of MySejahtera technology and any system...
Tasek Gelugor, Minister.
Tasek Gelugor. Sorry.
Bukit Gelugor is another place.
Yes, yes. Tasek Gelugor, sorry. On the use of technology, systems and so on. Indeed MySejahtera, indeed the ownership of that data belongs to MOH, which is the Government. Then, for any system that we want, that we have used, that we are currently using and that we will use, we will certainly ensure the security of that data, we give it very high attention and we ensure that it is guaranteed. For placing the CCMS or using this CCMS at clinics too, we involve the Malaysian Administrative Modernisation and Management Planning Unit (MAMPU) together. So, God willing, these matters are indeed being taken care of as well as possible. On the increase in cost, it is not true, Honourable Member, because in fact the use of the CCMS that we have introduced, its cost is very, what is it, very much beneficial to the Government or MOH, yes, because we will also use a new approach such as lease to use, which is actually that. As for the CCMS, it has several types for the different needs of clinics, yes. So, the maximum for the Honourable Member is more or less RM500 only a month and that
is very, very cheap and benefits the overall budget of the ministry. Okay.
Honourable Minister, I asked that because I understand that previously the cost for the TCS-OHCIS system was lower than RM500 just now. But however, one thing I do not quite understand is why, in the development of this CCMS, an outside company was used which may increase the cost, when we have many local experts who can also develop the same system? Perhaps at a lower cost and with higher integrity and trust, and that is why it should be done locally, in our own country. Thank you.
Thank you, Honourable Member. Actually, it is an off-the-shelf system. So, when it is off-the-shelf, it is indeed cheap. But regarding the Honourable Member's views just now, as I said, all of that has been taken into account and we have examined them one by one, and God willing I am confident that what we have adopted guarantees what the Honourable Member mentioned just now, including data security. Okay, to Balik Pulau, regarding the measures, yes. So, actually these measures are many, Honourable Member. I am sure some of them, but I can give a written answer for a more complete reply. For example, as of now, we are still continuing our CPRC that we monitor across the whole country, in every state. If there are, for example, still diseases like COVID-19, but we also monitor for other diseases. So, that is quite comprehensive, but the measures at the locality, facility level and so on, God willing we are quite prepared and improving them, Honourable Member, thank you. Okay, I will continue. In connection with the matter just now, yes, the Health White Paper, which outlines four pillars and 15 strategies in improving healthcare services and care in this country, was approved by this august House on 15 June this year. To answer the question of the YB for Kuala Langat. Is Kuala Langat here? Regarding the status of the Health Services Commission, the MOH is developing a governance framework by taking into account views from various internal and external stakeholders of the Ministry of Health Malaysia. The MOH is also examining the requirements for establishment, operation, human resources and financial implications based on domestic and international models, according to the suitability of the functions defined. Regarding the health insurance scheme as raised by YB Kuching...
Menteri?
Minister, just a moment.
Before moving to the new topic just now regarding the establishment of a committee that may monitor matters of healthcare services in our country. When is it expected that this committee will be established to monitor everything that has been approved in the Health White Paper? Thank you.
Thank you, Kuala Langat. We are currently in the process of detailing the structure of the committee and we are also looking at possibly the names that we can place on the committee that we are developing. But, God willing, we will involve as many people as possible in this committee from among those who are experts, including those within the ministry as well as outside the ministry. So, if the Honourable Member is interested, it is possible, God willing. Is the Honourable Member interested? If not interested, I cannot help.
Okay, regarding the health insurance scheme. As raised by the Honourable Member for Bandar Kuching, the Ministry of Health Malaysia (KKM) is studying and considering various health financing mechanisms, including the feasibility of a progressive contribution scheme through social health insurance or national health insurance with contributions from employees, employers and the government. It is insurance operated by the government on a non-profit basis (non-profit driven) and uses the philosophy of shared responsibility. Mr Speaker, the construction and upgrading of hospitals and health facilities will certainly take time to complete. Therefore, as an immediate measure to reduce hospital congestion, or a low-hanging fruit solution, with permission, RM200 million has been announced in this year's budget to finance public-private partnerships. For the information of the Honourable Member for Kuantan. Kuantan, are you there? Honourable Member for Kuantan, the said amount will be used to outsource government hospital patients to private hospitals, military hospitals and also university hospitals, covering both surgical and non-surgical cases. Regarding the Madani Medical Scheme. Another initiative that can also reduce congestion at the hospital's Emergency Department is the Madani Medical Scheme, and the YB for Kuala Langat has also asked about the status of its implementation in each district and whether there is any overlap with the Skim Peduli Sihat Selangor, yes. As the Honourable Member is aware, the Madani Medical Scheme has already been expanded nationwide, starting from 15 September 2023. So, up to 31 October 2023, the Madani Medical Scheme has provided benefits to 213,193 households, low-income recipients, and 355,467 minor outpatient treatments have been provided. In the state of Selangor alone, there are 708 private clinics that have registered and are ready to provide treatment. Of this total, Honourable Member, 28 private clinics are located in the Kuala Langat District. To avoid overlap, eligible recipients must make a declaration that they do not receive any benefit that is the same or similar to this scheme from any employer or state government scheme or any other medical agency, such as Iltizam Selangar Sihat or Perak Prihatin and others. For the information of the Honourable Member for Sungai Petani, Sungai Petani? Explanations to patients to seek early treatment at health clinics or private clinics registered with the Madani Medical Scheme without having to go to hospital are always carried out for patients, especially by frontline staff in the Emergency and Trauma Department with the assistance of the hospital's health education officers and also the hospital's respective Corporate Communication Unit. Patients are also advised to go to health clinics that provide extended hours services if the patient lives near such clinics. For the information of the Honourable Member for Kuala Langat who asked about the effectiveness of the extended hours initiative under the STAR pilot project, the number of patient arrivals after office hours was found to have increased by between 30 and 65 per cent, following the extension of the operating period. This means it has a positive effect. Of these figures, three to six per cent are patients referred from the nearest hospital Emergency Department to the health clinics involved in this project. I welcome the suggestion of the Honourable Member for Batu that the Ministry of Health Malaysia implement a digital system for all of the ministry's health facilities. The ministry has indeed had plans to improve service efficiency through the digitalisation of the national health system.
For this purpose, a pilot project for the Electronic Medical Record (EMR) is being implemented in Negeri Sembilan involving seven hospitals, 42 health clinics and 11 dental clinics. The ministry has carried out open tender procurement for the Hospital Information System or HIS project and the Teleprimary Care and Oral Health Clinic (TPC-OHCIS). The tender offer was closed on 31 October this year, and the appointment of the company is expected to be finalised by December 2023 or at the latest January next year. The use of the Hospital Information System (HIS) at KKM facilities will also include EMR records and patient appointment management. Through this HIS, patient information can be accessed and managed centrally and uniformly. Patient information in the HIS will be integrated with the Health Information Exchange (HIE) platform that is being developed and will be expanded in use across all facilities. Those are KKM hospital facilities, you see. So, through this integration, patients will be able to access information including hospital appointments via the MySejahtera application. For information, the Ministry of Health Malaysia (KKM) has successfully implemented the Cloud-based Clinic Management System or CCMS at 50 health clinics this year, and for next year, God willing, a further 100 health clinics, including village and community clinics, will be targeted. This CCMS is a transition from on-premise servers to cloud-based. Records...
Minister, Batu. Regarding the answer just now. I thank you, and when I met with doctors, especially at HKL, they told me that the time they take to write manually about this patient takes too long, and that is a major cause of why the waiting list is so long. I suggest that this opportunity or this initiative be used at HKL first. Thank you.
Alright. Thank you, the Honourable Member for Batu. We take note of that matter. It can be discussed with HKL, but HKL actually also has its own system. That is what we see, in fact, our hospitals and facilities have many systems of their own, but they are not – not in communication with each other. But, God willing, we will improve it, yes, with our EMR later. Alright. Digital records are very important for establishing fast, secure access to patient data that can be shared with all government digital health systems, thereby streamlining the work processes of KKM frontline workers, as well as shortening the waiting time to obtain treatment, as the Honourable Member for Batu suggested just now. Thank you. Mr Speaker, based on the experience of the COVID-19 pandemic, there is clearly a gap in health facilities between urban and rural areas. So, to answer the question of the Honourable Member for Betong on this matter, KKM is carrying out the Study on the Gap in Supply and Demand of Health Facilities, Equipment and Human Resource Capacity for Health in Malaysia phase 1 for 2023 to 2024 together with the World Bank group. The results of the study are expected to identify the actual number of health facilities, equipment and health workforce that are available and required according to the current and future needs of the population. The results of this study will also enable health resource policies and planning to be made according to evidence-based priorities or evidence list. Turning to human resources, Mr Speaker. The Ministry of Health Malaysia will continue to strive to close the gap in the ratio of health personnel to the population, as raised by the Honourable Member for Kuala Pilah and also Tanjong Karang.
In this regard, the ministry is always committed to ensuring the delivery of optimal health services, through the implementation of initiatives such as improving work processes, waiting times for treatment, implementing outsourcing activities, with permission, and applying for additional posts for existing facilities that are also new or newly operational and also upgraded. To increase the number of specialist doctors, the ministry for 2024 has been allocated RM200 million to finance scholarships for medical specialist officers, nurses, paramedics and other schemes, under the ministry, to undertake long- and medium-term training in service. Medical officers who pass specialist training will be placed in new facilities and facilities that are upgraded from time to time. This measure is hoped to reduce the congestion of existing hospitals, as is often raised recently. Regarding the statement of the Honourable Member for Kuala Nerus, okay, that many doctors are not absorbed into permanent posts. In fact, from 2019 to September 2023, a total of 8,596 contract medical officers have been offered permanent appointments. The majority of these permanent appointments were contributed through the permanent appointment process, namely 3,215 contract medical officers in 2022 and 4,263 contract medical officers in July 2023. The second round of permanent appointment offers, God willing in 2023, is being carried out by the Public Service Commission (SPA). These permanent appointments involve another 1,226 contract medical officers who are reserve candidates and will report to their placements, set for 18 December, yes, at the end of this year. So, subsequent permanent appointments will be carried out based on vacancies in permanent posts from time to time. The Honourable Member for Tanjong Karang asked about Hospital Tanjong Karang still having no specialist doctors, he said. For the information of the Honourable Member, up to August this year 2023, the ministry has placed a total of 16 resident medical specialists in the fields of internal medicine, general surgery, orthopaedics, radiology, emergency medicine, obstetrics and gynaecology, anaesthesiology and critical care, pathology and paediatrics. So, the total of all 16 persons and the number of specialists at Hospital Tanjong Karang available can be increased in future, God willing, according to needs and service demand. The Honourable Member for Semporna raised the matter that there is only one heart specialist in Sabah, yes, and that there are additional ones in Tawau and also Sandakan. In 2023, for the Honourable Member's knowledge, the state of Sabah has three cardiologists, including two specialists who have just completed training, a sub-specialty, this year. These specialists still require supervision by senior consultant cardiologists at the Cardiology Centre of Hospital Queen Elizabeth II (HQE II), Kota Kinabalu, especially when carrying out procedural and interventional treatment. Treatment of heart patients is also provided by emergency medicine specialists and internal medicine specialists at other Ministry of Health Malaysia hospitals in Sabah, and if more specialised treatment or interventional treatment is required, we will refer them to the Cardiology Centre, HQE II. The ministry continues to strive to train new cardiologists with targets and also to offer cardiology services at Hospital Sandakan in the coming year. The Honourable Member for Tumpat, the Honourable Member for Larut and also Kuala Nerus have questioned the need for private facilities that employ foreign nurses up to 40 per cent of the nursing capacity at a private facility. For the information of the Honourable Member, the 40 per cent quota is actually a policy set by the Ministry of Human Resources, yes. Not the Ministry of Health Malaysia.
Regarding the justification for recruiting foreign nurses at the initial stage, the issue of a shortage of nursing manpower in the private sector was raised by the Association of Private Hospitals Malaysia (APHM). So, the shortage of nurses has caused private hospitals to face difficulties in expanding and optimising health services at private facilities. Accordingly, the ministry has studied the projected nursing requirements in the private sector and agreed to provide conditional relaxation. Our relaxation is a conditional relaxation, Honourable Member, to private health facilities to recruit foreign-trained nurses, or in short JTWA, for a period of 12 months from 1 October 2023 to 30 September 2024. Although the validity period for the recruitment of JTWA is only for one year, Honourable Member, an extension of service is allowed for another 12 months based on approval of the Temporary Practising Certificate (TPC) and it will be reassessed according to circumstances and current needs.
Honourable Minister?
Ya.
Thank you, Honourable Minister. The actual situation: is there truly a shortage of nurses in our country, or is the recruitment because the salary of foreign nurses is cheaper than that of local nurses? If there is indeed a shortage, what is the government's policy to add more centres or increase the intake of new students to ensure we have enough nurses in our own country? Thank you.
Thank you, Honourable Member. Actually, what happened, Honourable Member, during the pandemic for three years, we could not carry out full training for nurses, lah. Three years, we lacked of three years. Training for these nurses, it takes about 5,000 people, lah. Maximum, yes. So, what happened? When there is a shortage for that period, then it becomes insufficient. That is why we decided to open up space, because as I mentioned earlier, for example APHM, yes. They said that they have capacity up to – there is still capacity of up to 1,000 beds for them to maximise their services, but they cannot get nurses.
That is why we give room to review where we can provide space so that they can optimise that capacity. We must remember that those who come to these private hospitals, Honourable Member, are those who are able to afford it. So it does not affect the services to public hospitals, because public hospitals cater to people who are of more modest means. Therefore, because of this, we have set those conditions, and we open up, and I am sure it will also help the national economy.
[Bangun]
There is also a programme that we implement under MHTC, where we encourage people from abroad to come and obtain services in our country, which is implemented by these private hospitals. So that helps to attract and increase the country's economy. So...
Yang Berhormat...
That is what I said – just a moment.
Saya nak...
Let me finish my answer briefly, Kuala Nerus. So, for now, we indeed see that there is a shortage in the number of nurses. Now
most nurses are mostly graduates of ILKKM. So, God willing, we are also looking in future to obtain these sources from IPTA, for example. So, God willing, the hope is that within the next two years we can overcome this nurse shortage problem, and most of the nurses who graduate from ILKKM are indeed absorbed directly into government hospitals and facilities. Thank you.
I have listened to the Honourable Member's answer on the shortage of nurses in our country. We want to allow, the government wants to allow us to take from foreign countries. The condition given is only 12 months and can be extended for another 12 months. I am a former Minister of Home Affairs. So I know that bringing in outsiders for 12 months is a condition that I think is extremely difficult. So if it is to be given, let it be properly two years at a time. But, never mind. The government has done it with such a condition because the cost is quite high, yes, one. But what is important to me, is there not another way? If we do not have enough – the Honourable Member said three years in the pandemic. During that time we could not produce trained nurses in sufficient numbers. Why do we not give the opportunity to those who, in the situation our country is facing with the high cost of living, we ask, give the opportunity to those who have actually already retired, to return to serve within that 12-month period? That is better than bringing in these outsiders. Because I think this is a path that can provide a win-win not only for those who need nurses...
[Bangun]
But also for Malaysians who are already trained and may have the chance to find work that they have actually done before.
Honourable Minister, thank you. I would also like to follow on from what was stated by the Honourable Member for Larut. Rarely do I agree with him, but this time I agree with the Honourable Member's opinion. We see that the government's current policy is to reduce dependence on foreign workers, number one. Suddenly, the Minister's ministry has made a clarification in this honourable House saying that perhaps we will take trained workers, nurses, from abroad. If we go to Singapore, for example, at Singapore International Airport, we see that there are workers there who assist us when we arrive at the exit gates, where most of them are senior citizens who are still healthy, can speak, converse and have qualifications. Perhaps they are former staff of ministries or of airline companies who, after retiring, were re-appointed to continue their work. At the same time, I would also like to ask the Honourable Minister, whether there are any plans for us to take on, temporarily, as temporary workers, trained nurses who work at private medical centres? Because, for example, in Penang, I give the example of Hospital Lam Wah Ee, which has its own centre, where they train nurses. These nurses are trained nurses. Perhaps if there is room, where the...
[Bangun]
Ministry of Health could consider, then nurses trained by these private medical centres could be taken on, not permanently but on a contract basis
until the Ministry of Health is able to train enough nurses to meet its own needs. But I support the suggestion of the Honourable Larut. Honourable Jelutong supports Larut this time, where we [Applause] – if Larut proposes something good, Jelutong must support it. Things that are not good, I certainly do not support. But his suggestion that there are female nurses who may already have retired but are still healthy and able to serve, who could perhaps contribute in other ways, such as becoming head nurses in emergency wards or head nurses where critical surgeries take place, drawing on the experience of, for example, a matron who has already retired. So, I believe that he, or these retirees, can be taken back to work rather than us recruiting workers from overseas, Honourable Member.
Terima kasih.
Mohon dipertimbangkan.
Honourable Member, Kuala Pilah would like to raise a question.
[Speaking without using the microphone]
No, before it ends. I, Kuala Pilah, actually want to raise a question: whether the Ministry of Health (KKM) is ready to explore, with permission, to explore a method of acquiring assets at KKM, at the hospitals, which I have observed, if these asset acquisitions, purchases or procurements are made on such a large scale. I see billions, purchases of new assets, new equipment at these hospitals. So, I raise whether KKM is ready to explore the leasing (memajak) method. I think this is a method that KKM should consider, and if it is suitable, practical and economical, perhaps it could be adopted by the Ministry of Health. Thank you.
Thank you to the many Honourable Members who are interested in this matter of nurses, alhamdulillah. [Laughter] I actually enjoy hearing that. Good. Honourable Member, based on the ministry's projections for 2023 and 2024, approximately 8,000 nurses are needed. The number of nursing trainees that we train at IPTA and IPTS over these two years is actually insufficient to meet the need, even if we add nursing trainees at ILKKM (the Ministry of Health Training Institute). But we are also thinking of other ways. Other ways. For example, what we see among them is that the number of nurses in Sabah and Sarawak is rather lacking. We also see that sometimes there are requirements. That is, when we want to recruit, there are certain, certain requirements, as people call them, for recruitment. For example, we want to ensure for nurses, we take 5B or that kind of result. But I will double-check this one, sorry. So, we are also thinking of perhaps, for those whose qualifications are rather low, running a pre-programme. Before we enrol them in the actual course, we give perhaps another six months to train them a little more, there is time. Those are among the things.
So, what has been proposed by Larut and also Jelutong just now, I think we can also consider offering or giving opportunities to those who have retired to return to serve in the health service system. So we can consider that option, yes. I expect that perhaps many, as Jelutong mentioned, are still there. It is not only nurses, but also many others with expertise, even in other agencies too, perhaps because we now encourage active living for those who are of age. So, this is perhaps one of the areas where we can look at taking back those who have retired. Secondly, I would also like to inform you that
there is actually also a problem we see, which is mild distribution, where sometimes, for nurses, their expertise lies in the clinical field. So sometimes they are also involved in tasks such as clerking work, for example. So we are looking at that too, Honourable Members. So we are looking at the issue of mild distribution to ensure that nurses are used optimally, in their proper place. As for private medical centres, Honourable Jelutong, based on the information I have, the output from these private medical centres is usually absorbed directly into their own centres. So usually there is no benefit from there, but I will ensure that we also open up space if they are interested in serving at these public facilities.
Honourable Minister, is the ministry studying this mismatch between the expertise of nurses, viewed in terms of the government's policy which specifically allows the recruitment of nurses from outside, but your answer, Honourable Minister, is that you are studying the mismatch. There is expertise in terms of clerical work, expertise here. That means there is a contradiction between this ministry and the Ministry of Human Resources and the government's overall policy. How do you see this ya?
Thank you, Honourable Beluran. What I meant earlier is not a mismatch in that sense, yes. This mismatch, what I meant by mild distribution, which I used earlier, means that the expertise of nurses, doctors and so on lies in the clinical field, so caring for patients, treating patients, yes. So sometimes some of them, for example, have work such as recording, for example, procedures in the ward, for example. That can be done, perhaps we can take those who are not in the clinical field to carry it out. That is what I meant. So we want to place these nurses in the places where they truly belong, that is what I meant earlier. Mr Speaker...
A little, Honourable Minister, about nurses too.
Nurses too? Ha, many nurses, yes. Okay, good.
As it happens, my elder sister and my sister-in-law are both nearly matrons. So, related to nursing, I too, recently, in my area, Honourable Minister, we organised a course, a fully sponsored scholarship, to attract our young people to join this nursing field, with an allowance of RM600 to RM1,000 for three years, for those aged 18 to 25 attending the course, but unfortunately the response was not very large. So I would like to propose on this occasion that perhaps the Ministry of Health Malaysia should also go into schools, perhaps at the school level, to promote this nursing career. Because we have a shortage, and we know that our young people, these young Malaysians, have few jobs. So if there is space, it should be matched, I mean, the lack of employment with the opportunities that exist, for example in the nursing field. Thank you.
Thank you, Honourable Tenggara. I agree, and that is also our direction. We actually want to open up this space, and perhaps work together with the Ministry of Education (KPM) later, to expose children to services, career paths like this, and I agree. Insya-Allah, we will take note of the suggestion given by Tenggara.
Honourable Minister...
...I will answer, because it relates to assets...
Honourable Minister's time is up.
I will answer shortly.
Honourable Minister, I give you an additional 10 minutes.
Menteri.
Oh, 10 minutes. Good.
The Minister has already answered the question from Sibu here, yes, regarding the Invasive Cardiac Unit at Sibu Hospital.
Sorry, regarding what, Honourable Member?
Invasive Cardiac Unit in Sibu Hospital. Current status, is there any new news about the Invasive Cardiac Unit?
There is latest news, Honourable Member. I will answer that in writing later, the answer is lengthy. So I will continue first, let me continue, yes. Returning to the nurses just now, JTWA. This recruitment of JTW can help optimise the operation and services at private facilities. These facilities will be better prepared to support the Ministry of Health Malaysia in meeting the health needs of the people through public-private partnership. Indirectly, this step will have a positive effect on various economic sectors such as tourism and health, and subsequently stimulate the country's economic growth. The measures taken are not expected to affect public services, as almost all ministry nurses, as I mentioned earlier, are absorbed directly into permanent posts. To ensure there are enough nurses to provide the best health services to the people, the ministry has implemented various initiatives, the following, which may also address the concerns of the Honourable Member earlier. The ministry is working with the Ministry of Higher Education to lift the moratorium freezing the opening of new private nursing colleges, in order to increase the production of local nurses. Secondly, the intake of Diploma in Nursing trainees sponsored by the ministry has been increased from 1,000 to 2,000 each year. Meanwhile, community nurses will be trained to become trained nurses through a Diploma in Nursing bridging programme, from 800 people to 1,000 people. Applications to the central agency for the creation of additional posts in phases, involving various service schemes for the existing facilities of this Ministry of Health, for the years 2023 to 2025. Fourthly, phased permanent intake of Diploma in Nursing graduates from IPTA and also IPTS in 2024. I appreciate the concern of the Honourable Jelutong and also the Honourable Balik Pulau, who touched on the issue of bullying experienced by new doctors. To address this problem, the ministry has implemented several initiatives, including setting up a special task force to improve the healthcare work culture, namely the Healthcare Work Culture Improvement Task Force on 13 May 2022, to study the issue of bullying occurring among ministry personnel. The study found that of 110,411 respondents, comprising officers and staff of the ministry, who answered our survey questions, 60 per cent, that is 66,247 respondents, have positive feelings at the workplace, while 20 per cent, that is 22,082, chose neutral feelings. That is not all, that is not all. The remaining 20 per cent, that is 22,082 respondents, have negative feelings towards the workplace. I am confident that this figure is also quite high, yes.
Honourable Minister.
Then, based on the results of the survey session as well as current findings during the field visits and engagement sessions, this task force recommends
that several improvements should be implemented. The first aspect is the determination of competency criteria and standards at the recruitment stage, as well as implementing pre-screening of candidates for Graduate Medical Officers (PPS), and standardising PPS training. We also suggest standardising the mind transformation programme and hospital orientation for all graduate training hospitals. Then, establishing a support group for PPS and other services. Improving existing policies, guidelines and procedures relating to complaint and bullying management. Lastly, digitalisation of work processes. This is important. Integration of the Ministry of Health Malaysia system, as well as several other recommendations that we can refer to in the full HWCITF report that I mentioned earlier, on the official portal of the Ministry of Health Malaysia.
Honourable Minister, thank you for the explanation and feedback. I appreciate it, because I myself have several friends who work as medical officers and who have complained about this bullying problem.
However, I would like to propose, if possible, that consideration be given especially to medical officers working in emergency wards across Malaysia, where, if possible, the ministry considers giving them leave of at least one week, with one or two days of rest made compulsory, so that they do not- well, you know, in every emergency ward, they receive accident victims, victims of all kinds of cases. So, I think that if the ministry can consider allowing them to take leave every Saturday, Sunday or alternately, where they can rest with their families and return to carry out their duties, because I find that they do not have enough time to take leave. Perhaps they are on call all the time, and this may be one of the factors that causes them to bully or to become victims of bullying. Thank you. Please consider.
Thank you, Honourable Jelutong, we can consider it, but as I said, the problem with this hospital is that we never close even for one day. Imagine if the hospital closed for 24 hours, what would happen? Then with the shortage of workers, so we are improving. Insya-Allah, as I mentioned at the beginning regarding human resources, we are also looking at that situation, and alhamdulillah last year, we converted, for example, contract doctors into permanent placements. That is among them, and that is really gratifying to their hearts, and there are also several other things we have implemented to ensure our workers, our staff, do not experience conditions such as stress, and their mental health is not disturbed. So I thank you for the suggestion of the Honourable Jelutong. So, a little more, Mr Speaker, I have three minutes left to answer. Actually, mental health, as the YB Jelutong raised just now, is also important for me to answer. Perhaps I can read out a little of the answer that has been given to me, namely to YB Setiu, YB Betong and also YB Kulim-Bandar Baharu, who showed concern for the issue of mental health by proposing wider mental health screening, including for the homeless, and cooperation with the Ministry of Education. So, for the information of the Honourable Setiu, Betong and Kulim-Bandar Baharu, a total of RM24.6 million has been approved for the implementation of activities under the Mental Health Programme in 2024. Mr Speaker, I have two minutes left. I want to end- take one more answer to...
[Mr Speaker presided over the Sitting]
Honourable Minister. Honourable Minister, can you? Thumbs up.
I have only 2 minutes left.
Just a little thumbs up.
Ya.
Thank you. On that day, Jempol submitted a proposal to upgrade Jempol Hospital from an ordinary daily hospital to a minor specialist hospital, in view of overcoming the congestion at Kuala Pilah Hospital, where most of the referrals come from Jempol Hospital, and also to provide health services for the 155,000 residents of Jempol. Also, during my visit that day, its equipment was advanced. So, I hope it can be considered further by the ministry.
Thank you, Jempol. Insya-Allah, we will consider it. For another issue, health tourism. I strongly agree with the suggestion from YB Tanjong Karang that the government promote health tourism.
Speaker, Speaker. Sorry, Minister.
Just a little, I have 1 minute left. Sorry.
Maran, Maran. Let the Minister answer first, Maran.
I have only 1 minute left, 1 minute.
Be a little patient, I too have the right to speak. What is this.
As added value to encourage more foreign tourists to come to Malaysia. For the information of YB Tanjong Karang and Honourable Members, Malaysia has been renowned as a health tourism destination for various types of high-value curative treatments such as cardiology, cancer, fertility treatment, orthopaedics, gastroenterology, ophthalmology, urology, neurology and so on, since 2011. So Malaysia has great potential in health tourism, with income in 2023 expected to reach RM2 billion, compared with the pre-pandemic achievement in 2019 of RM1.7 billion. Accordingly, the government has allocated RM30 million in 2024, an increase of RM10 million compared with 2023, as recognition by the government of the potential of health tourism as one of the country's major export service sectors, and this increase in budget can also create more opportunities to develop this sector. The ministry greatly appreciates the concern and also the suggestion of the Honourable Bandar Kuching that the ministry implement initiatives to care for the ageing population in this country through the National Dementia Action Plan, and this is in line with the WHO's recommendation, the Decade of Healthy Ageing 2021 to 2030, and the Ministry of Health Malaysia has developed a Dementia Action Plan to ensure that health services for older persons remain relevant to the latest health challenges of older persons. Mr Speaker, I would like to conclude and close my winding-up speech. Once again, I extend my heartfelt thanks to the Right Honourable Prime Minister, who is also Minister of Finance, for the substantial allocation received by the ministry, and this large allocation is an investment by
the Unity Government, which is always attentive and concerned about the good health needs of the people... [Applause] It will further contribute to increased productivity for the empowerment of the country's economy. All initiatives approved in Budget 2024 will be implemented by the Ministry of Health Malaysia promptly and systematically to ensure that the benefits can be enjoyed by the people, in line with the aspirations of Malaysia MADANI, insya-Allah. So, earlier I began with a pantun. I also end with a pantun. A two-line 'kerat' pantun, Mr Speaker, may I?
In the course of our daily work, our health must be strengthened; The budget allocation is spent wisely, the people healthy, the nation at peace.
Debating is done, the winding-up is done too, all promises will be kept; To Allah we surrender, Alhamdulillah, the closing words.
That concludes my winding-up for today. For questions that I did not have time to answer, I request to provide a written reply. Thank you... [Applause]
Okay. Thank you, Minister of Health. I invite the last ministry, the Ministry of Finance. Please, Minister- Prime Minister. Please... [Applause]
Assalamualaikum warahmatullahi wabarakatuh, peace be upon you. Mr Speaker, the Honourable Members whom I hold in high regard. Thank you and appreciation for the proposals and criticisms submitted. More than 85 Honourable Members have touched on several matters, and some of them I can address here. More than 13 Honourable Members touched on the economy, fiscal matters and the national debt, including the Honourable Member for Larut, Paya Besar, Beluran, Pokok Sena, Pasir Mas, Kota Melaka, Kuala Terengganu and Betong. The Honourable Member for Larut questioned the government's seriousness in reducing the fiscal deficit, rather than providing a large budget to assist. I will address "rather than" - Pasir Mas, don't worry. Reducing the deficit, Mr Speaker, does not necessarily involve neglecting the welfare of the people, but the fiscal deficit is indeed a problem. That is why it was 5.6 per cent in 2022, and five per cent this year has been achieved, alhamdulillah. However, we will try to bring it down to 4.3 per cent in 2024, but the fiscal position remains expanding because RM386.1 billion in 2023 and an addition of RM393.8 billion in 2024. What proof is there that this government is delivering assistance and easing the burden on the people? That is the question raised by the Honourable Member for Larut and several Honourable Members I have mentioned earlier. Because the concern has a basis, as sudden reductions in the deficit may possibly undermine the position of development projects and the protection of the people's welfare. So I explain, for example, as was also explained by the ministers before, including the Minister of Economy and MITI, the unemployment rate has fallen to 3.4 per cent as of August 2023.
Next, assistance for smallholder rubber planters. The last time assistance was given was during Bagan, RM2.50 per kilogram. There was no change in 2020, 2021, 2022. In the 2023 Budget we raised it to RM2.70, and this year it has been raised again for next year, to RM3.
That means from RM2.50 to RM3.00 per kilogram for smallholder rubber planters. The paddy price subsidy has been raised, after not being raised for a long time, to RM500 per metric tonne. In the budget, the paddy floor purchase price has been raised again from RM1,200 to RM1,300. So, this is a sign that this fiscal reduction and deficit do not undermine projects that uplift the economy for the people. For example, the implementation of repairs to schools and clinics involving more than 8,000 toilets. This has been announced, and this time we have added more for government-aided schools, religious schools, SJKC, SJKT. Then we focus on potholed roads because this is a problem in many cities, towns and suburbs. One important matter is that in 2003, a former Prime Minister cancelled all maintenance of Islamic educational institutions and people's religious schools. We have added an allocation of RM150 million for people's religious schools in our country... [Applause] Amanah Ikhtiar, since 2011 there has been no additional assistance for Amanah Ikhtiar. This year we have added RM100 million for Amanah Ikhtiar. Micro-credit through BSN, Bank Rakyat and MARA, RM350 million. Then, among those who are bankrupt, young people under 40 years old who have debts not exceeding RM200,000 are released from bankruptcy status or category. These are just some examples. I will not read them all, merely to answer that it is not true to say that reducing the deficit, which is regarded as an accountability in economic policy, will undermine the welfare of the people. Then the agenda of reform and governance was also emphasised, what has been done? I say, firstly, the Fiscal Responsibility Act, the Public Finance Bill, and Fiscal Responsibility, which are very important and in fact hand over part of the Minister of Finance's powers to Parliament. Next year we will table the Government Procurement Act and business dealings will be expedited. What I call speed, approvals that have been a problem from the Federal level, state to municipal level. Then several of the following measures, the Minister of Transport on JPJ special plates which are carried out through tender, and the financial surplus is handed over to the people as welfare programmes including providing crash helmets. The Honourable Member for Kuala Nerus and Padang Rengas raised the difficulty of self-employed people obtaining housing loans. This is an important concern.
Dato’ Seri.
I will conclude this, just briefly. From 2008 until 2022, from 2008 until 2022, RM1 billion was spent involving 5,000 borrowers. Okay. For this scheme, this year alone, imagine from 2008 until 2022, the Housing Credit Guarantee Scheme raised by the Honourable Member, 5,000 borrowers. This year alone an increase of 12,000 loans and RM3 billion in one year... [Applause] 46 per cent of them are people without a stable source of income. Through the 2024 Budget, Mr Speaker, an additional RM10 billion in SJKP which will benefit 40,000 borrowers. So, I hope the Honourable Member will study that speech and the Budget book before making criticisms.
Sila Beluran.
Dato' Seri, if we look at the whole of next year's budget, it only allocates some RM90 billion for development funds. If projected to the states of Sabah and Sarawak, it is too insignificant to uplift the dignity and infrastructure needs of both states. How do you see the whole of next year, to address the imbalance between
development in Sabah and Sarawak compared with Peninsular Malaysia, with the development fund allocation that Dato' Seri has provided for the whole of next year? It does not show a fund that is sufficiently significant to uplift and help these two states, in terms of procuring infrastructure compared with the states of Peninsular Malaysia. Thank you, Honourable Member.
Thank you. I will touch on that matter when I address the development fund and also Sabah and Sarawak. I will address it shortly.
[Bangun]
However, I want to summarise what I said earlier, namely I emphasise 2008 until 2022, 5,000 borrowers, RM1 billion guarantee. 2023 up to August, 12,000 borrowers, RM3 billion. Next year in the Madani Budget 2024, 40,000 borrowers, RM10 billion. Beluran raised earlier the matter of bringing the fiscal deficit down to three per cent, is it possible? I explain that if we can bring it down from 5.6 to 5.3 per cent, I think that is manageable. Several measures have been taken, including making the budget more prudent, and I also ask the Chief Secretary to the Government to take steps to request departments to ensure the budget is more orderly and prudent. Secondly, there are measures for subsidies or targeted subsidies that we have announced. For example, several measures in this budget include Capital Gains Tax and High-Value Goods Tax. That will add to government revenue, estimated at RM4 billion. So, I expect the fiscal achievement can be implemented. Then, this is our assurance to the Honourable Members. We set a fiscal deficit target of five per cent, then 4.3 per cent.
[Bangun]
If it is not achieved, for example, I have no choice. I will have to table it again to be challenged, supported or criticised by the Honourable Members. That means, for me this is a beginning, that the government cannot make projections arbitrarily, because the Honourable Members must be presented again and the Honourable Member has the right to give views. That is the meaning of fiscal responsibility.
Machang bangun.
Thank you, Honourable Member. In the 2023 Budget speech, the Honourable Member spoke about continuing the MRT 3 Project, and this year nothing was mentioned except LRT 3. So, I want to ask the Honourable Member what is the status of this project because it involves development, and infrastructure has a spillover effect on our SMEs. Does the Honourable Member intend to continue off-balance sheet financing in terms of contingent liabilities for projects like these, because we already have the Fiscal Responsibility Act for next year. So, how does the Honourable Member plan our development? Thank you.
This is the answer to the questions or matters raised earlier. It is not a new question, but never mind. MRT3 we did not include because it is not in the plan. However, our decision is only at the stage of taking over land. That is why our concern is that if it is implemented later, the cost will rise. Okay, the development allocation for Pasir Mas and Rasah raised it, yes. I want to explain there is some confusion and I would advise Honourable Members to read the Estimates of Expenditure book. Because Pasir Mas said that in 2023 spending was RM97 billion, and 2024 RM90 billion. That means, now it is less. If you read, you will know that in fact the 2023 figure was RM97 billion, of which RM13 billion was for paying off 1MDB debt.
So the actual figure is 84 billion. That is stated in the Budget Book, Economic and Fiscal Outlook, Budget 2023, Table 3-10, page 49. Next time, read first, yes. So, if compared 2023 and 2024, 2023 Development Expenditure RM84 billion. 2024, RM90 billion. Is there 1MDB payment this year? No. 1MDB, according to the 2023 schedule, had to pay RM13 billion. The later payment, the one in 2036 if I am not mistaken, is still a long way off. That is why it is in my- later. That means, RM84 billion Development Expenditure for the year 2023. The year 2024, RM90 billion...
Sila.
Thank you, Honourable Member. Earlier we talked about our expenditure deficit. What I questioned is that the revenue we received originally, when I debated the expenditure tabled by the Honourable Member, the figure was only about 307, billion, yes, but now it has become RM312. 4 billion difference. That is why sometimes, if- don't scold, read, we should read. Why say read or not read, we should just read. That is why whenever there is this error, which causes us to say sometimes we feel like we don't want to read even... [Applause]
[Dewan riuh]
So, don't question about reading. We are all the same. We want to help, that is why I say whatever we want...
[Dewan riuh]
Look, Honourable Member.
Silakan.
What do they want this? We want to tell them that what we propose is to give balance. To help the people, do not let the fiscal deficit that we want to reduce go so far that it cannot help, but I am grateful earlier because the Honourable Member said it's fine if it cannot, we bring it back here. That is an answer which I said gives a space, a hope that we can still help the people. That is why what I wanted to rebuke earlier, don't say not reading. Because we do read, because that erroneous sentence came out. Thank you, Honourable Member.
Thank you. The one who said not reading was the Honourable Member for Pasir Mas... [Applause] [Laughter] Regarding what I said about the page, the payment of USD3 billion, which is equivalent to about RM13 billion. That is all. Okay. So, for the following year, the RM90 billion can be explained. Okay, Beluran, Semporna and several from Tuaran, Kota Belud, yes, raised the question of expenditure for Sabah and Sarawak. I think let us be fair on this matter.
The Honourable Member for Tambun.
The total expenditure or allocation for Sabah and Sarawak is indeed high, yes. I say here, the highest in history. Can it solve all problems? I admit it cannot. It takes time. I defend the need to add allocations for Sabah and Sarawak because there appears to be a gap between Peninsular Malaysia- at least some areas of Peninsular Malaysia and Sabah and Sarawak, but this does not take into account several other allocations that we add later, including the water supply for Sabah and Kelantan, which I must mention, and the large injection from PETRONAS for Sabah and Sarawak, yes. How much allocation for Sabah? RM6.6 billion, yes. How much for Perak? RM1.7 billion. How much for Sarawak? RM5.8 billion. How much for Pahang? RM3.2 billion, but for all states including Kelantan, we have added significantly... [Applause] From several years ago to RM2.8 billion now. Kedah rose by RM1.8 billion.
So for all states without exception there is an addition of allocation, but for Sabah and Sarawak we are also bound by several Federal grants under the Malaysia Agreement 1993. That is why for 2024, the Federal grant for Sabah is RM1.53 billion. For Sarawak, RM1.63 billion. For the special grant called interim, yes. Sarawak since 1969 had an allocation of RM16 million, which was never increased. Only this year it was increased by RM300 million, yes... [Applause] Sabah was last increased in 2020, RM125.6 million, now increased to RM300 million... [Applause] Then LHDN knows that we have appointed representatives of the states of Sabah and Sarawak. That is an amendment which the Honourable Member has passed. I thank you.
The Honourable Member for Tambun, may I have a way through.
Okay, let me finish Sabah, Sarawak.
The Honourable Member for Tambun.
Let Sabah, Sarawak be finished first.
Then, the implementation of project procurement. For any projects of RM50 million and below, we hand over fully to the states of Sabah and Sarawak so that there is no need to refer to Putrajaya for approval. That is to the Treasury, yes. Regulation of electricity supply. Previously Sarawak was completed, Sabah from 3 January 2024. Bintulu Port, we hand over to Sarawak... [Applause] That is according to the understanding of the MA63 Agreement. Imagine, in 1963 there was an agreement, we had negotiations towards that. I took over, I saw there was indeed a decision that the port in Sarawak be handed over to the state, so we are in negotiations to hand it over to the state. Then the Sarawak State Government with the cooperation of Sabah wants air services, rural Sabah, Sarawak to be negotiated. If it can be taken over by the state. The Sarawak State Government invited and I agreed immediately because with the cooperation of the Ministry of Transport, the maintenance process is expedited and handed over to the states of Sabah and Sarawak...
Sila.
Dato' Seri, if compared, the development allocation for Sabah RM6 billion this year with Pahang RM3 billion. It cannot be compared like that because Pahang is further ahead. Sabah, a lot of catching up. A lot of catching up. We have been deprived of a proper allocation. I appreciate the additional interim allocation which was raised from RM120 something to RM300 million this year. That is a fairly significant addition, but if the basis of that addition is viewed from the Malaysia Agreement 63, then it is- it should be more than RM300 million because if we look at the provisions of the Federal Constitution 1, 2(c) and (d), it should be 40 percent of whatever is collected. So, is this government going to look into that, the 40 percent so that the interim grant can be increased and can be used by the Sabah State Government to allocate additional funds for applications for the state. So, we appreciate 6 billion, but if compared with Pahang's 3 billion, definitely is not comparable because Pahang is further ahead in terms of infrastructure, infrastructure procurement.
Thank you. Yes, I do not dispute that principle. However, like the interim special payment. This is the first time the Unity Government has done it and it was not done before. That must be acknowledged.
Secondly, Honourable Member, I acknowledge it, but do not forget that for Pan Borneo, the expenditure we approved is RM16 billion, which is not included in what I mentioned earlier. The Hybrid Solar generation in East Sabah, the Southern Link transmission line network in southern Sabah, all of that has been carried out. If the Honourable Member says this is still lacking, I agree, but do not expect that we can solve problems that have been outstanding for decades within one year, yes.
Yes, because the Honourable Member is not only from Sabah, Sarawak but also goes down and there indeed is a gap in basic matters. Fire, water, potholed roads, we are trying to solve those this year. Then Pan Borneo, then very deprived facilities including schools in rural areas. In the interior we acknowledge that, that is why I say we add allocations even larger, and let us not say we want to equalise, we do not equalise Perlis, Pahang, Kelantan, but it is impossible for us to neglect them. That is why I say there is a water problem in Sabah, we also solve the water problem in Kelantan. So, if we say Sabah faces a major problem then we leave Kelantan, cannot. So, that is why in this financial capacity situation we must try to balance needs, but what I agree with the Honourable Member is that focus on critical problems in Sabah, Sarawak cannot be postponed...
Semporna.
Thank you very much, Mr Speaker, and thank you very much...
I have already done this many times.
Sabah first. Sabah, Sarawak for a moment. This is the Pendang person, the Pendang person for just a moment, let Sabah, Sarawak, Semporna...
[Dewan riuh]
Silakan Semporna.
Thank you very much Mr Speaker, and thank you very much Honourable Member who has explained the allocation channelled to the states of Sabah and Sarawak and announced RM6 billion. We really appreciate that contribution. In fact, if we look back at history, in 2009, when Datuk Najib was Prime Minister, for the first time in the history, dengan izin [with permission], RM5 billion for Sarawak, RM5 billion, if I'm not mistaken RM4 billion to Sarawak, but unfortunately from such a huge allocation, sound big but when come to delivery system, I was the Minister also responsible for implementing some projects, after that was allocated but not even RM5 billion reached. Money was not spent, there were a lot of complications with land, various administration, end of the day, less than almost RM3 billion only, RM2 billion gone. Similarly, when the Honourable Member mentions Pan Borneo, I really appreciate that RM16 billion has been announced, but this is a recurring matter. From what Datuk Najib announced, I recall earlier RM17 billion for Pan Borneo. I recall the Honourable Minister of Works also knows about me at that time in Sarawak, when that announcement was made, but unfortunately it was stalled, Dato' Speaker, until now. Alhamdulillah, in Sarawak it is already, I think, almost 80-90 percent. At the Sabah level it is still stalled and appears to have failed. When I was Chief Minister, how many projects from Sipitang failed, from Inanam and also several areas failed, several companies that were there could not implement them. And this I suggest to the Honourable Member, the proposal for pre-Q, I really appreciate it, and open tender. A good step to restore, so that we can assess the real contractor who can deliver the job, not only because they have the money, they have the expertise.
We do not want, tomorrow, the contractor appointed afterwards to be unable to implement it. Like in Tawau, they have done well, the contractors there were monitored well, that's why it's my constituency. When I see the quality of the job, I go down to the ground...
Baik.
In terms of this situation, I hope that open tender and this pre-Q can be implemented. Do not implement the practice of the past, which I admit. Thank you very much - that work, which I don't think, and we continue with the failing contractors. Thank you very much.
Thank you, I missed earlier the matter of the allocation mentioned by Beluran, the interim one. Interim financing, indeed it should be increased and now it has been, and is in the process of negotiation. Meaning, if it rises from RM16 million to RM300 million, that is a progress, but it is still being negotiated so that there is an increase. That is the guarantee I gave to the Premier of Sarawak and also the Chief Minister of Sabah. On Pan Borneo, the success in the Sarawak portion is very high, our problem is in Sabah, and now that task has been taken over by TPM 2 to coordinate and expedite. What Semporna mentioned is accurate, but past experience, we learn from that experience, that is why the process was expedited, including pre-Q, and direct tender was cancelled because direct tender is what caused the delay of several projects. So that pre-Q, I have fully assigned it to TPM 2, and coincidentally he is also from Sarawak, he understands better, and with instructions to expedite the process. So, I thank you for that reprimand. Okay, now we bring good governance in administration. Parit raised the role of the Auditor General to ensure there is no abuse of power, leakage and so on. The Public Accounts Committee report is important. Although there are people who belittle governance or corruption, when we read that report, there are many problems. The full report will be tabled in a short time. So, I only got it from its summary. For example, among the examples given was the failure of 104 ventilators out of 136 obtained during the pandemic. This PAC, or Public Accounts Committee, lost RM505 million, and as a result 8.5 million vaccine doses expired. Then, the Auditor General gave a briefing on public money losses, as just one example, RM700 million in losses due to: (i) matters of management of the national paddy planting programme; (ii) management of property development of LADA Langkawi; and (iii) regulation of firearms under the Ministry of Home Affairs (KDN). These experiences must be taken into account and we emphasise they must not recur, because unlike past experiences, we have decided to take action as soon as it can be confirmed. Officers, managers or Ministers or whoever is responsible must be subject to action. This also includes management of funds of government companies that are less than satisfactory, including under TEKUN Nasional. The details, the Honourable Member will examine when the full report from the Auditor General is tabled later.
Tan Sri, this concerns governance. Thank you Mr Speaker, thank you Honourable Member Tambun. I am very excited by the winding-up presentation this afternoon. Earlier it was mentioned prudent, clean and careful, alhamdulillah we also agree. Firstly, I want to touch on subsidies that are prudent and careful, this phrase. Subsidies, if in 2023 they were RM76 billion and have increased to RM81 billion, the disparity is RM5 billion. Therefore I want to ask: the chicken subsidy of about RM2 billion was withdrawn, where are we going to spend this chicken subsidy, whereas
subsidies increased from RM76 billion to RM81 billion based on the Budget tabled the other day? That is the first. The second, I mention this error, a matter that I feel when we re-read the budget report: the error difference is RM4.1 billion, from RM623,500 increased to RM4.6 billion, more or less RM4.1 billion. So this is an error. Should such things happen in such a very large amount, in indirect taxes of this country? This is a serious matter. So I hope the Prime Minister will take action against the Minister of Finance or not? The second, or to the KSP, when such a huge error occurs... [Applause] The third, I also want to ask for an explanation from the Honourable Prime Minister regarding governance or procurement in the Ministry of Finance, whether this is one method, is this a new method called circulation or award outside sitting? For example, if I am wrong, please correct me. Circulation or outside-sitting award for a radar supply centred in Kuching to monitor the South China Sea. Security item given to a company named... [Unclear] So that is all. I ask for an explanation from the Honourable Member Tambun regarding these three matters I raised. Thank you.
Thank you. Although it is not relevant to what I answered, never mind. Pendang here strays a lot, but I will comment on subsidies later, it is in his heading.
About the "error", the Deputy Minister of Finance 1 has already explained. Between the early circulation and the correction, so had to- it had already been printed, that is the problem. So it was identified- I was informed, so I said it was just an error. Because we cannot withdraw the book as it is too late, that is what was explained. Matter...
Honourable Member, if I may continue on the "error" a bit. Same topic.
Wait. Hold on.
Sekejap.
This radar is under security, former former Home Ministers all know. When it comes to security facilities, sometimes they are not announced, but I can give details if permitted under- which does not compromise security. I will inform, but what I remember, yes, several needs including at ESSCOM, radar needs at ESSCOM, and what I mentioned earlier was the decision under the National Security Council, on security matters.
Okay, please, Putrajaya.
Honourable Member Tambun...
[Bangun]
Before that, I want to advise. During this winding-up, new matters cannot be raised, because it is not fair to the Minister to repeat when he does not have the information in the debate. If matters that have been raised can be clarified, that is fine, but not new matters, okay.
I did raise the matter of the deficit.
Okey.
In discussing the deficit. So that is why I touched on it earlier when Pendang mentioned the error earlier...
Okey, okey
I want to link it with the deficit. So, if we look at the explanation of the Honourable Tambun earlier and also the explanation of the Honourable Pontian the other day that the book was already finished, so in the end the Cabinet Meeting in the morning made changes. Thus there must be an error, and that error was on our table on the 23rd of the month, only arriving on Monday, with the letter dated the 17th of the month. However, the issue relating to this deficit concerns me as a Member of Parliament, because usually any tax increase is discussed carefully and is already in the book, ready. As I recall, this is the first time in history this has happened. So, we want to know, was the approach of this SST not properly detailed? Although two percent- correct, food items are not included, correct. However, other items are included, and also logistics, for example. From nothing, never there, it was included in this item. So, from zero to eight percent, a big increase, its impact is big. So that is why I say, is this matter in a situation where the government wants to achieve the expected deficit? At the same time wanting to spend, and therefore must find new revenue, and the new last-minute revenue, the largest is through the SST increase of RM4.67 billion. So, if this is the situation, this is a very dangerous signal because we make last-minute decisions. Not enough to find where, so SST is raised. So, that requires explanation. Thank you, Honourable Member.
Okay, thank you. There is no danger at all. If you say it never happened, that is not correct. You did not do your homework. I was once Minister of Finance, amended in the morning by Ministers, had to amend the paper. If tabled at 3, 4 o'clock, many times. However, later with experience it was corrected. In this matter, this matter has already been explained by the previous Deputy Minister of Finance, and this decision I mention, like the service tax, is an old decision, and we have already explained in Parliament that Service Tax will be imposed. Only the new details we mention now. Okay, 26 Honourable Members, including Pagoh, Bera, Bagan, Muar, Shah Alam, Labuan, Keningau, Kluang, Pendang and other names I mention in the full text, raised the matter of expansion of scope and increase of the service tax rate to eight percent. So, yes, we want to impose it, but the service tax that we know is exempted- what, food and drink; telecommunications; permanent vehicle wear and so on, including those mentioning logistics, brokerage, guarantee and karaoke. But regarding logistics, it is indeed true we are refining and ensuring that matters that directly touch the interests of the people will be exempted. This will certainly be explained when we table the detailed way. This matter is also related to capital gains tax brought up by Subang, Ayer Hitam, Julau, Permatang Pauh, Machang. Okay, the purpose is to broaden the tax base, and as we know, capital gains tax mostly affects the rich. That is why sometimes I do not understand why we- want to tax the poor, we cannot; want to tax the middle class, we want to avoid it; want to tax the rich, it is objected to. So, because- I said that capital gains tax is adopted by most countries. In fact, in Thailand and Indonesia, CGT and corporate tax are at the same rate. For us, CGT is 10 percent, while if in Thailand and Indonesia corporate tax is 30 percent, then CGT is 30 percent, but we do not impose it. The purpose is what is called progressive taxation. Meaning, if we want to impose tax, the tax is on the rich. What is exempted includes disposal of shares relating to an approved Initial Public Offering, internal restructuring and venture capital companies. Does it have an effect on PMKS? I say it is not imposed, unless there is a sales capability that gives big profits to PMKS, not in normal circumstances. Imposition of CGT on listed shares is also not implemented. Okay, the treatment of CGT is the same as the disposal of shares of property companies under the property gains tax. Gains from disposal of shares are calculated based on the actual acquisition price. This follows the indication method in tax computation since 1988, not a new matter. Okay, for now it is not imposed according to the shareholding period. Only when change of ownership occurs is it imposed. Okay, High-Value Goods Tax. High-Value Goods Tax, called Luxury Tax, was also raised by Putrajaya, Jerlun, Kuala Selangor, Tumpat and some others. This aims to increase revenue, to impose tax on the rich, namely those called super-rich, which was also disputed by some of my friends, colleagues of the Honourable Member. It will be enforced from 1 May, but there are concerns about the impact on tourists. So we exempt them, meaning tourists can still get tax refunds at the airport. So, whether five or ten percent depends on- I say the category of goods, and when tabled, Honourable Members can debate. So, there is new legislation introduced to exempt this tax for tourists.
gains from disposal of shares are calculated based on the actual acquisition price. This is according to the indication method in tax computation since 1988, not a new matter. Okay, for now it is not imposed according to the shareholding period. Only when change of ownership occurs is it imposed. Okay, High-Value Goods Tax. High-Value Goods Tax, called Luxury Tax, was also raised by Putrajaya, Jerlun, Kuala Selangor, Tumpat and some others. This aims to increase revenue, to impose tax on the rich, namely those called super-rich, which was also disputed by some of my friends, colleagues of the Honourable Member. It will be enforced from 1 May, but there are concerns about the impact on tourists. So we exempt them, meaning tourists can still get tax refunds at the airport. So, whether five or ten percent depends on- I say the category of goods, and when tabled, Honourable Members can debate. So, there is new legislation introduced to exempt this tax for tourists.
The Honourable Member for Ketereh, please stand. Please go ahead.
Thank you, Mr Speaker, thank you Honourable Minister of Finance.
[Bangun]
I felt excited a moment ago because many states- Sabah and Sarawak were given such good allocations, which can improve their standard of living. I am a veteran...
[Dewan riuh]
Representing 2,700 veterans.
We already know.
Sabar-sabar.
Dengar dulu.
...Two stars... [Laughter]
I have already talked about this, I just want to ask for clarification. I want only that, a guarantee from the Honourable Minister. Okay, because- other answers did not convince me. Today, I have met the Honourable Minister himself, the Minister of Finance, the Prime Minister. So, I think the Prime Minister himself already knows what I want to say. Okay, like this. Okay like this.
Ketereh, the PM doesn't know... [House in uproar]
Jangan gelak, jangan gelak. Tolong jangan gelak! This is a very serious matter for the veterans.
Please, please, silent, silent. Okay, okay, please, Ketereh.
Okay. As the Honourable Member is well aware, 78,546 veterans who retired before 1 January 2013 are claiming their right to pension adjustment. Based on the first, Part Five of the Peraturan-peraturan Angkatan Tetap Pencen Ganjaran dan Faedah-faedah Lain 1982. Every time there is a salary adjustment, a pension adjustment must be made. Second, based on the decision of the National Veterans Council, which sat on 29 September and approved the pension adjustment for ATM veterans who retired before 1 January 2013, chaired by Dato' Hishammuddin as Minister of Defence at that time...
[Dewan riuh]
Sembrong, Sembrong.
[Ketawa]
So, based on those two factors, I have told this matter since the Royal Address earlier, on the 2nd of February, that it be expedited.
May I answer? May I answer? I understand. May I answer?
So I want to ask for a guarantee today from the Honourable Prime Minister.
Ya.
Please resolve this veterans' problem, because they are all old already. The majority are 70 and above.
Betul.
Baik.
Then, 1,756 personnel were injured during operations.
Okey, baik.
So please have pity on these people. So I very much hope that today something will come out of the mouth of the Minister of Finance that gives a guarantee to all these veterans.
Okay. Thank you.
That's all, thank you... [Applause]
Congratulations, Ketereh. Long live the veterans.
Thank you. Okay. Thank you, I take note of the Honourable Ketereh, and indeed there was a meeting that Sembrong chaired. I have answered all of that. We are now conducting a comprehensive review of the salary adjustment that has been delayed for almost 12 years. Not only veterans but also civil servants who have not had a salary adjustment after a decade, as promised. So that is why I said, for now, I indeed give all of them RM1,000, because I think...
[Speaking without using the loudspeaker]
No, no... but...
Ketereh, Ketereh cannot do that.
I hear, I hear.
Yang, yang...
Ketereh must sit down first. Sit, please. Sit a moment, sit a moment.
Temporary measures, Honourable Member, because this adjustment will involve a large sum, yes. I do not want to repeat what happened before: we settle the problem of civil servants, we leave out the professionals, we leave out the education teachers, and then like the time of the military. So we are asking now, together with the Chief Secretary to the Government (KSN) and KPPA, to carry out a comprehensive study. Let not a single one be left out, yes, but the Honourable Member must also accept the temporary measures. Let me tell you what temporary measures I have put in place. I have allocated RM10 million for TEKUN Veteran, RM20 million for Renjer Komuniti among veterans, RM1,000 for veterans, RM100 million for the BSN Veteran Micro Scheme, training protégés for workers, and a special quota for veterans in the government... [Applause]
Betul, betul.
Courses and training under HRD Corp. We have done all of these. Is this the solution? No. This is while we make a comprehensive salary adjustment, which takes into account the views of veterans and also military leaders. I met the PAT recently. I said that in the paper brought by the military side now, do not only discuss officers. Discuss all the problems raised. So I am only giving one assurance: we have started a study with the secretariat at JPA to look at the salary adjustment in full, including retired military personnel. So please give me a little time to put forward proposals, and if necessary the Honourable Members who are former military, we can call them to negotiate together so that we can know what we are doing. Okay?
The Honourable Prime Minister.
Okay. Just a little, just a little, Honourable Member. Just a little.
[Ketawa]
I am very grateful for all the assistance given to veterans. However, the matter of pension adjustment is their right, as stipulated by law.
Baik.
So they are entitled to pension adjustments whenever there is a salary adjustment.
Kita bincang.
So why is it not started, or done gradually? We are not the same as the other older ones.
Patience, patience, Honourable Member. I am saying, I take it into account, yes. I take into account that there have only been two meetings so far, yes, but I have given an assurance and clearly given instructions. I do not want any more reports from JPA that leave out any claims, because there are many others who also complain that their professions seem to be sidelined, or their promotion opportunities and so on. For example, the military. If I am not mistaken, 46(a)(1) means there is one category for promotion. That is different from civil servants. There must be other courses and additional tests. So the military feels this is unfair. If it can be set aside so that promotion is the same as for civil servants, all of this we will examine carefully, so please be patient a little and we will call you in to negotiate...
[Dewan riuh]
Okey. Saya...
The Honourable Prime Minister.
Honourable Member.
Saya minta.
Okay. Never mind, never mind. I, I agree.
Not allowed. Not allowed. We cannot debate like this.
No, no. It is not a debate.
Not allowed. Not allowed.
Mr Speaker, please. I agree.
The Honourable Member.
I am ready to discuss with the Honourable Prime Minister...
[Dewan riuh]
Alright, alright, alright. I invite Ayer Hitam.
Subsidies, subsidies. I thought, if possible, because time does not permit and I have to cover all the subjects.
Cukai.
The diesel subsidy raised by Kota Marudu, Temerloh, Sibu, Libaran and Rantau Panjang. We know that the subsidised diesel price is RM2.15 compared with the market price of RM3.78, and we follow the subsidy principle explained also by the Minister of Agriculture. Yes, what is it? We subsidise 3.5 million foreigners. We subsidise the super-rich. Some raised the question of why I say super-rich. Including Alor Setar and several others, I do not remember, yes. Alor Setar, Larut, Machang, Hulu Terengganu, Maran, Marang. I am not opposed to rich people. The super-rich are this category because they cannot receive alms and subsidies. That is all his point. We are not angry with him because he is rich. We are saying that the subsidy programme for diesel, petrol, chicken, all of these benefit the rich. So we want to avoid this happening, because that is why it is called targeting of subsidies, and if in this way the people are burdened by sugar prices rising, or flour prices rising, or chicken prices rising, we will not change this subsidy policy, but we will give an additional injection to STR, which involves nine million people. That means those who will benefit from government assistance to reduce their burden, yes, but this was raised, it is a little about language. Where is this super-rich? It is not correct. "Maha", the term maha. Mahasiswa, ha...?... [Laughter] Fine. Then there are other terms, for example. Ha, Mahathir... [Laughter] [Applause] Alright. No, no, because it is said not allowed. This is law. This is only for Allah SWT, "maha suci", or at least "maha mulia" only for the Sultan, not allowed. Mahasiswa is allowed, mahaguru is allowed, maha wangsa is allowed. This one must learn a little language too. Like "ketimbang." I asked Dewan Bahasa, yes. This term follows the times. It is what is called- the situational description. This is language theory: context of situation. People use it, so it is used. Previously there was no "alaf", no "mampan", no "ketelusan", yes, but when we use it, Dewan Bahasa examines it, especially budget speeches, and then they feel it is suitable, and they expand it, and I also agree with Bera, so that we strengthen the language, yes... [Applause] And therefore, consistent with the call of Bera, I have instructed all government departments, yes, and local companies, that they may not write in English or other languages. Write in Bahasa Melayu, but if it is an international company, that is exempted, yes. Some misunderstood. International companies are allowed. Some did not agree. So it was just a digression, the language issue that was raised.
Back to the diesel subsidy issue. Alright. It is used only in Peninsular Malaysia. Why? In Sabah and Sarawak, diesel is used much more widely. So if we want to implement it, we must study its impact in that way. The Honourable Member knows that the actual cost for this year has reached RM81 billion, and we pay it to foreigners, 35 million people, and the groups I mentioned, the "super-rich", but fishermen who receive the diesel subsidy will continue to receive it.
[Bangun]
[Bangun]
[Bangun]
[Bangun]
Also, diesel vehicles in the public transport category, including vans and school buses, will also remain at RM1.88, yes. So, I hope this can accept the readjustment of diesel, because it can reduce the government's burden. Alright. This is the same as what the Minister of Agriculture said yesterday about chicken prices. Alhamdulillah, up to yesterday and today, chicken prices remain under control. However, I do not deny that sometimes, in some places, there are reports of rather high prices, but I have a list that was brought. For example, today's chicken price. I do not understand. In Perlis, it is cheap, RM6.99, but in Arau Perlis, Kangar Perlis, at Padang Besar, there may be a slight difference, Dato' Arau, yes, before... [Interjection]. Oh, still low. That is the first time Arau has agreed with me.
[Dewan ketawa]
Honourable Member Arau, thank you. The high ones are in Labuan, yes. The highest are in Labuan and in Sabah, Sarawak. That is why our instruction is that this rahmah scheme is expanded more greatly in Labuan, Sabah and Sarawak. That is- this is the Sumbangan Tunai Rahmah, and the Sumbangan Asas Rahmah, which were also raised by Tebrau and Jerlun.
The Honourable Prime Minister.
Alright. Now, how many people benefit from STR? That is nine million people, Tan Sri Mr Speaker, yes. STR, nine million people, and for Phase 4 on 7 November, we will add 5.2 million recipients who will receive STR between RM100 and RM1,200, and applications for appeal that are approved will receive RM100 up to RM2,500 at once. The total value of Phase 4 for this November alone is RM2.1 billion. That means this assistance is hoped to ease the pressure raised by the Honourable Members. So, new applications have been opened for this. Alright. STR has been increased from RM8 billion to RM10 billion for nine million residents, and the maximum rate for poor families has been raised from RM3,100 to RM3,700... [Applause] That is why I am confident, if the poorest families in this country can receive RM3,700, this will by itself facilitate steps to end abject poverty... [Applause] The SARA rate- apart from STR, there is also SARA. SARA has been increased from RM600 to RM1,200 for- with the number of beneficiaries increasing from 200,000 people to 700,000 people. That means an increase between RM600 and RM1,200. So, those who raised a small matter, say a price increase, should not forget that the addition of assistance- that means direct assistance to these families, not only to the poorest. To nine million. That means the middle class. We are studying whether, given the circumstances, some subsidy targeting needs to be further enhanced. I say, increase it for next year, RM2 billion.
Ayer Hitam is there, Honourable Member.
The Honourable Prime Minister. The Honourable Prime Minister, about tax for a moment.
Ayer Hitam, Ayer Hitam first.
Thank you, Honourable Prime Minister. I would like to congratulate the Honourable Prime Minister for saying STR has been increased to RM10 billion. That helps nine million people a great deal. I welcome the statement of the Honourable Prime Minister just now that he will clarify the expansion of scope over the logistics sector. I think this is one of the matters we are discussing. We are very worried. When logistics is increased by eight percent, all places will increase in price. Once prices have increased, we want to abolish it afterwards, but prices will not come down. I welcome this, it is a good action. Hopefully, we can get a result.
Second, Honourable Member, I was interested in what the Honourable Member mentioned just now, RPGT- Real Property Gains Tax. We have one Act and we have CGT. Both of these, if we dispose of a property, 30 percent in the first two years, but CGT is also 10 percent. In this situation, there is an overlap of two Acts currently in operation. Are both charged, or must one law be amended so that only one is charged? That is many accounting firms that are marked firms, yes. Second, I think the Honourable Member just mentioned tax or CGT. I want to ask the Honourable Member. During engagement with stakeholders, among the proposals was that unlisted shares be charged on companies holding unlisted shares in other companies, and it does not involve individuals, but the announcement by the Honourable Prime Minister, apparently in public. Is the government's policy to charge unlisted shares on ownership by any individuals as well as companies? I think this matter will give more clarity to the public. Thank you.
The Honourable Prime Minister.
Ayer Hitam mentioned logistics. That is true. That is why I explained that logistics must be studied so that aspects that are offensive or that could enable public use which would enable the price increase are exempted. That is being set aside, but the service tax on logistics is not eight percent, yes, it is six. That is what I want to clarify. The Honourable Member said eight. No, it is six, but the scope of the logistics sector, yes, I have asked the Ministry of Finance, because I see that several Honourable Members have raised concerns, I asked them to hold a little more engagement to obtain input from them before we decide finally. So, RPG so far indeed does not involve listed shares. However, in the disposal- because our policy is unlisted shares, but if an explanation is needed, we will specify it, because it has not yet been finalised in detail. Alright, this I- I have been long...
Boleh teruskan.
Last, last, Honourable Member.
Sik, may I ask a little, Honourable Prime Minister.
I raised the issue of royalties. I waited until the end...
Yes, yes, yes.
The Honourable Member is not touched on.
Ada, ada.
So, since you want to touch on it, I want to give a little clarification to the Honourable Prime Minister.
I have not yet answered, he wants to give it.
Regarding- I accept- wait, perhaps this one is an added value to the Honourable Member's answer.
No, this is the winding-up. It is not the Honourable Member's debate. I will touch on it...
A little, just a little.
And answer at that time.
Please, continue, Minister.
Alright. The investment performance raised by Titiwangsa, Sembrong, Bachok, Tenggara, Seputeh, Kuala Nerus, has largely been answered by MITI and also by the Minister of Economy, and I do not want to repeat it. I only want to state that perhaps Sembrong has not followed the development that, unlike an MOU, this has approval. I place more weight on approval and implementation. There is, for example, indeed, because the Honourable Member for Sembrong also has experience. Sometimes we are only enthusiastic about discussing MOUs, but sometimes they are not implemented. There was one year in which MOUs were announced, and only 40 percent were implemented. So there is a policy to remind that we should not just trumpet MOUs, but in this case, as mentioned, such as Infineon, that has already been implemented. RM25 billion, RM25 billion Infineon has been concluded and has started implementation. Likewise Geely with Proton in Tanjong Malim, decided and implemented. Aramco, whom I met recently, to expand the project there. That was confirmed by Putra MBS himself that the board will come and implement. So I agree, not everything announced is implemented, but current performance, so far, exceeds performance before the pandemic. So, this is a good development. What was mentioned just now...
The Honourable Prime Minister, Sik would like to ask a little.
Including Elon Musk, and also those from the Middle East, including recently NBZ in Mazda, the RM40.6 billion, and his delegation has already come to implement it. No longer an MOU. The agreement has been signed, and implementation has begun. So, that is also an effect of the visit. To take into account the criticism from the Honourable Member, because of this delay, at Cabinet level we decided that the Minister of MITI is assigned as coordinator in ensuring implementation together with MIDA. MATRADE has handled the delegation, and MIDA becomes the secretariat for more effective implementation. This is because Malaysia, as a trading nation, must depend on high domestic investment as well as foreign investment.
The Honourable Prime Minister.
The Honourable Prime Minister, Sik would like to ask a little?
Daripada tadi.
Yes, Honourable Member? Tan Sri.
When will you answer about royalties, Honourable Member?
I give the floor to Muar, yes.
Terima kasih.
When will you answer about royalties?
Thank you, Honourable Prime Minister. At the last Parliamentary session, the Honourable Prime Minister gave a proposal which I accept, namely that Parliamentary allocations be given fairly and equitably. Negotiations must first be held with the Deputy Prime Minister's side. Muar has already met with Deputy Prime Minister II for this purpose. My question is, what clear SOP follow-up action can be outlined? Are negotiations sufficient, or, as has perhaps been discussed for the past one or two weeks, is there a need for a media statement to be issued? For example, by two Members of Parliament stating support for the Honourable Prime Minister. This matter is important so that Members of Parliament know what they need to do to obtain allocations.
...seminggu dua minggu yang lepas iaitu perlu ada kenyataan media yang dikeluarkan. Contoh oleh dua Ahli Parlimen yang menyatakan sokongan ke atas Yang Amat Berhormat Perdana Menteri. Perkara ini penting supaya Ahli-ahli Parlimen tahu apa yang perlu mereka lakukan untuk dapat peruntukan.
Alright. Thank you. The statements from Kuala Kangsar and Labuan did not consult me or any Minister, yes. So, if you want an explanation, ask Kuala Kangsar and Labuan. Of course I welcome it because of their maturity and wisdom... [Applause]
Honourable Minister, Sik requests a little. Sik requests a little explanation.
Hopefully- after this, Arau next.
The Honourable Prime Minister, Sik requests...
[Dewan riuh]
Baik, baik.
Honourable Member, you just said you would answer about royalties.
To answer, to answer...
Mohon penjelasan.
Yang Berhormat.
Request Minister. Sik requests.
Honourable Member, you just said you would answer about royalties.
Yang Berhormat.
...By Kuala Kangsar and Labuan, but TPM II has been given the task together with the Committee, as we did when the Honourable Bera was Prime Minister. There is engagement, negotiation, looking at the ready parameters, and we continue. I do not budge from that. As for saying this is oppressive, meaning the previous government was oppressive, this is it, did not allow.
...Tak.
It is not oppressive. We did it, oppressive. What you did was not oppressive. What law is this? The law of the jungle, not Islamic law.
Yang Berhormat.
Minister, a brief explanation.
The Honourable Member said...
Honourable Minister, Sik requests a little. Sik.
Honourable Member. Honourable Member mentioned Arau just now. Just a little. Just a little.
Tuan Speaker.
I would like to inform the Honourable Member that Arau is now Chairman of the PAS Parliamentary Committee, you know.
[Ketawa]
Okay. Number two, Honourable Member. Honourable Member, when Bera was Prime Minister, he only told all Honourable Members at that time to support the budget. We too can support the budget. No problem, but...
[Dewan riuh]
Why were conditions given, telling us to support until the end of the term and so on. Never mind.
Now, Honourable Member, I would like to ask for a correction. A correction. Earlier it was an additional RM4 billion. My correction: my own Members of Parliament number 75, and RM300 million is requested to be withdrawn. Why? He does not want to give money to us, so it must be withdrawn. So now the allocation is still there. So....
Right, does "not wanting to contest" mean now...?
[Dewan riuh]
No. The Honourable Member does not want to give, so why a correction?
So, take the decision now.
That is a threat, that is a threat.
Ha, look at that...
[Dewan riuh]
The Honourable Member for Arau proposes....
Today, the Honourable Member...
The Honourable Member for Arau proposes that it be withdrawn.
This Budget should let us bring back good news. Declare that allocations be distributed equally.
Right. Thank you.
Just became the Prime Minister of unity.
Chairman of what committee, what committee, the Parliamentary Committee.
What is it, Honourable Member?
Chairman of the Parliamentary Committee.
[Ketawa]
I am the Parliamentary Committee. That is why I have to speak...
[Dewan riuh]
Yes. After this they will become even more the Chairmen of the Perikatan Nasional Committee. So, I have to speak in this Parliament, Honourable Member.
Okey. Okey.
For the Members of Parliament.
The Honourable Member for Arau has carried out his duty.
Honourable Member, are you seeking merit or sin? Seeking merit by giving allocations... [Laughter] Seeking sin by withholding allocations... [Laughter]
Haih.
Honourable Minister, regarding royalties.
Honourable Minister...
Honourable Tan Sri, since joining PAS, he is quick to pass judgment... [Laughter] Right.
Honourable Member, regarding the royalties just now.
What the Honourable Member for Muar mentioned, I propose...
Just a little. I want to ask about the Prime Minister's subsidy.
No. Let me stress once again, the conditions and so on, the Honourable Member can discuss them. The Honourable Member for Larut also knew before. It already exists, let us sit and discuss first. I do not want to give any decision. Do what has been discussed, and if it is reasonable, approve it. There is no problem. Do not say there is no allocation, that is not right. I said the Members of Parliament's allocation is a decision made later. It is not a must, it is not a right. The country's responsibility is to provide sufficient allocation to the people. Not to Members of Parliament.
This is for the people, Honourable Member...
[Dewan riuh]
Dato’ Seri...
Yes. Representatives have allowances. They have salaries. They have allowances. That is their right. Do not add rules, because when they were in power, they did not think about this matter. We will wait a long time then.
Honourable Member for Tambun, may I interject briefly?
Our friends in Keadilan, DAP, PAS at that time also never got into government before. Then, even when they came to power, we still did not get anything until there were negotiations.
The Honourable Member for Tambun. That is one matter...
I propose negotiation. Right.
Honourable Member for Tambun, may I interject briefly on this matter?
Yes, Sik asked for a long time just now.
Honourable Member, regarding the royalties just now, your royalties.
Tuan Speaker.
When will you answer about the petroleum royalties for Kelantan?
Tuan Speaker.
Petroleum royalties were also never approved during the Perikatan Nasional government. Now...
The Most Honourable Member for Tambun promised reform. This is not reform.
Everyone, listen first. He asked, we answer.
Why, when becoming the holder of power, repeat the old arguments?
We will answer here, here.
Honourable Member, please sit down.
This should be the era of reform. Do new things...
[Dewan riuh]
Please sit down. Tasek Gelugor, please sit down.
Right. So, I said we will scrutinise the allocations in detail. Like Terengganu, he asked, yes. Those involving salaries, I do not delay, but those involving projects we examine carefully. That the project must follow strict financial procedures. That means according to financial rules and regulations.
For example, if there are urgent ones like Kenyir. No need for lengthy ones. I immediately agree and approve, up to a target of RM200 million, yes, and some of those projects fall under the royalty fund mechanism. So, we can, and I have asked the Ministry of Finance to obtain input from the states on such matters.
Honourable Member, I want to refer my answer to the question to the Most Honourable Member.
Right. The depreciation of the Ringgit.
Honourable Prime Minister. Let Sik ask one thing.
Petroleum, petroleum.
Baik.
A little, a little, Honourable Member. Just a little.
Menteri...
[Dewan riuh]
The Ringgit was mentioned, he said Malaysia which... [Inaudible]
Why did the PN era not approve it? Because I did not become Prime Minister.
Faktanya...
Now the Honourable Member is Prime Minister....
Pengkalan Chepa.
...Kena luluslah.
Pengkalan Chepa.
The fact is, yes, that is correct. This is a problem. Earlier, Bank Negara announced that the OPR was not raised. It remains at three percent... [Applause] That means Singapore 350 basis points. The United States, 525 basis points, and Malaysia 125 basis points. In the last question, Pasir Mas also wondered. He said if it rises, there will be no effect. When I answered then, I said Turkey's inflation was around 40 percent. Let me correct that. Turkey's inflation is 61.5 percent. So, if it rises, it is not easy. The Minister of Finance there is a very capable person, Mehmet Simsek. He said it takes time. It cannot be immediate even if the interest rate is raised. Argentina, inflation rate 138.3 percent. Our inflation was announced recently by the Department of Statistics Malaysia (DOSM) to be below two percent. So, that means there are other factors decided by the US Federal Reserve (Fed) but they do not influence our stance. If we think solely about the value of the Ringgit, we raise the interest rate, but I just received information from Bank Negara that the decision is to maintain the OPR at three percent.
Right, so I have tried to answer most of the matters raised, including the language issue just now about "ketimbang" which is not in Dewan Bahasa. Dewan Bahasa has answered. Dewan Bahasa has answered. It said it was indeed at the Committee level and will be included in the following Dewan dictionary...
Honourable Member, I am not satisfied with the answer on royalties just now. Language, enough already, why repeat the language matter? That has been settled...
[Dewan riuh]
The royalty matter is important, Honourable Member. I...
Pasir Mas, the royalty matter is finished. Now the language matter.
Finished what?
Pasir Mas did not stand, never mind.
What is finished? You did not answer at all.
So once again I thank the Honourable Members...
Baik
Why does the Honourable Member not want to answer?
Honourable Members... [Applause] Now I put the question to the House for decision. The question is that this Bill be read a second time now. [Question put and agreed to] [Bill read a second time and committed to the Committee of the whole House]
Honourable Members, I put the question that the Motion in the name of the Honourable Minister of Finance in this Order Paper, that this Motion be referred to the Committee of Supply, be agreed to.
[Motion put and agreed to]
[Resolved, that the following Motion be referred to the Committee of Supply: "That this House, pursuant to subsection 4(3) of the Development Fund Act 1966 [Act 406], resolves that a sum of money not exceeding ninety-two billion ringgit (RM92,000,000,000) be expended from the Development Fund for the year 2024, and for the purposes and particulars of Development Expenditure stated under Development Purposes or ("P") in the list of the Estimates of Federal Expenditure 2024, presented as Command Paper 34 of 2023, the sums be allocated under the relevant Purposes opposite those particulars in columns six and seven of the said list."]
Alhamdulillah. Honourable Members, the sitting of the House today is adjourned until 10 a.m. on Monday, 6 November 2023. Assalamualaikum warahmatullahi wabarakatuh, and good night.
Speaker, no need to rush, slowly is fine too. Go a bit easier.
Lujnah Parlimen.
I want to break my fast now. Thank you.
[The sitting was adjourned at 6.52 p.m.]
Special ChamberSpecial Chamber
[Tuan Ir. Ts. Haji Khairil Nizam bin Khirudin (Jerantut) chaired the Sitting]
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Plan to Build or Accredit National Sports School in SarawakSpecial Chamber
Thank you, Mr Speaker. Peace be upon you and good afternoon.
Mr Speaker, the Honourable Deputy Minister of Education, I would like to draw the attention of the Honourable Deputy Minister to the need to build a National Sports School or to have SMK Tabuan Jaya upgraded, recognised and converted into a fully-fledged National Sports School in Sarawak.
At present, even for a state as large as Sarawak, we do not have a National Sports School, with SMK Tabuan Jaya only recognised as a State Sports School. It is a sports school in Sarawak that provides services to athletes from across the state, including those from rural areas. They have trained and discovered many of the best talents in sports who have succeeded at the national and international levels. Among the alumni of the school is our national diving queen, Datuk Pandelela Rinong.
We really need a National Sports School in Sarawak. In Malaysia, there are more than five such schools, namely one in Sabah, Terengganu, Kuala Lumpur, Johor, and the most recent in Perlis. I believe there is an urgent need for such a school, whether it is built in Sarawak or existing schools such as SMK Tabuan Jaya are upgraded and given the resources needed to achieve the status of a National Sports School.
Therefore, I hope the Honourable Deputy Minister can present the government's plans on this matter. That is all, thank you.
I ask the Deputy Minister to respond, please proceed.
Thank you, Mr Speaker. The Ministry of Education Malaysia (KPM) thanks the Honourable Member for Bandar Kuching for the question regarding the need for a Malaysian Sports School in Sarawak.
For the information of the Honourable Member for Bandar Kuching, we use the term 'Sekolah Sukan Malaysia' and not 'Sekolah Sukan Kebangsaan'. KPM is always committed and carries out continuous efforts to ensure that the provision of sports infrastructure and basic facilities can be made available in schools throughout the country.
The provision of sports infrastructure and facilities that are up to standard, conducive and safe has always been a priority for KPM.
In line with this, KPM applies for new construction and upgrading of sports infrastructure and facilities in stages for schools throughout the country through the Five-Year Malaysia Plan, including development plans involving the state of Sarawak. KPM is prepared to consider the construction of a Malaysian Sports School (SSM) Sarawak based on planning, needs, the physical condition of existing infrastructure and the suitability of the site, as studied by the State Education Department of Sarawak.
For the information of the Honourable Member for Bandar Kuching, KPM through JPN Sarawak is conducting detailed and well-planned studies and planning to ensure that the logistical aspects, basic needs and land area meet the requirements of the long-term plan for a Malaysian Sports School Sarawak. This includes holding discussions and engagement sessions with the Ministry of Education, Innovation and Talent Development Sarawak to decide on the new direction for the construction of SSM Sarawak.
Careful planning needs to be done to optimise the expenditure of KPM's development projects and to avoid wastage in the future.
Due to the land area of the school and unconducive conditions, SMK Tabuan Jaya cannot be converted into a Malaysian Sports School, Sarawak; it will remain a State Sports School, Sarawak.
However, for the information of the Honourable Member for Bandar Kuching, KPM is committed to upgrading the sports infrastructure and basic facilities at SMK Tabuan Jaya through Rolling Plan 5 in RMKe-12, in 2025, with:
(i) upgrading of the eight-lane synthetic track that meets the specifications of the World Athletic Organization, with permission, including field and track events;
(ii) upgrading of the cow grass football field to meet the specifications of the Federation of Internationale Football Association
(FIFA);
(iii) upgrading of the covered multipurpose sports courts;
(iv) upgrading of the indoor sports hall;
(v) upgrading of the pavilion; and
(vi) other related works at SMK Tabuan Jaya to ensure that student athletes from across Sarawak, including those from rural areas, can train and have their potential honed at an optimal level.
That is all, thank you.
Thank you for the answer. I ask the Honourable Member for Bandar Kuching to put forward the question.
Thank you, Mr Speaker. Thank you for the very comprehensive and detailed answer.
The Deputy Minister is indeed a person who is very concerned about education issues in Sarawak. I hear and accept that answer.
However, I would like to ask, what are KPM's plans to realise the establishment of a Malaysian Sports School, Sarawak, so as to give the opportunity to student athletes of Sarawak to continue to be developed and to have their potential honed at the Malaysian Sports School Sarawak? That is all, thank you.
Thank you, Mr Speaker, thank you to the Honourable Member for Bandar Kuching. For the information of the Honourable Member, KPM, through JPN Sarawak, will hold discussions together with the Ministry of Education, Innovation and Talent Development Sarawak regarding the proposal to establish a Malaysian Sports School Sarawak.
JPN Sarawak will hold discussions together with MEITD Pendidikan Sarawak no later than the end of November this year for further discussion on the proposal for a Malaysian Sports School Sarawak and the direction for establishing the Malaysian Sports School Sarawak, to ensure the excellence of student athletes of Sarawak in the field of sports for this country. That is all, thank you.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Increasing the Yield and Income of FELDA SettlersSpecial Chamber
Assalamualaikum warahmatullahi wabarakatuh and peace be upon you, Mr Speaker. Hulu Selangor would like to touch on the income and earnings of FELDA settlers.
This matter must be given attention because it involves the welfare issue of all FELDA settlers.
The total number of settlers across all of FELDA is 112,638 people.
FELDA targets eight tonnes of yield on a monthly average, equivalent to RM6,000 a month. However, only a few FELDA schemes have managed to achieve the target, and the rest have not achieved it.
The answer given by the Ministry during the previous Special Sitting stated that FELDA's leadership and settlers had agreed to review the minimum income of settlers to be increased from RM120 per acre to RM150 per acre. I ask the Ministry to explain whether the review has been carried out, and I request that settlers' income be looked at with a value more suited to current circumstances, given that the value of goods is increasingly high, not merely RM150 per acre.
I understand that many factors cause plantation productivity and yield to be affected, thereby impacting settlers' income, where some of them only receive RM1,200 a month. I see three
main matters that need to be given attention by the government so that operating costs can be reduced and, at the same time, settlers' yields can be increased.
Mr Speaker, the first matter is fertiliser subsidy. If a fertiliser subsidy can be provided, I am confident the government will succeed in winning back the interest of those who manage their plantations independently to rejoin FELDA. The second matter is labour quota. It is understood that the existing labour quota is insufficient for the whole of FELDA. If labour is insufficient, productivity will surely decline and thus affect yield collection.
The last matter is technology subsidy. The government and FELDA need to consider the latest technology to obtain higher yields. For example, machines or technology for harvesting fruit and so on. At the same time, this will attract the interest of local young people to work together in the management of FELDA plantations.
I ask the ministry to take note of these three matters so that the yield and income of settlers can be increased. I hope the ministry can work together to think of the best solutions for the good of all FELDA settlers, especially in Hulu Selangor. That is all, thank you.
Thank you to the Honourable Member for Hulu Selangor, and thank you for the presence of the Minister to answer this question, please proceed.
Thank you, Honourable 'Temporary Speaker'.
[Laughter] Thank you for the question. I would like to record 'Temporary Speaker'.
Mr Speaker, the Unity Government today is very committed to assisting the settler community on welfare issues relating to the yield and income of FELDA settlers, which is also related to the minimum income of FELDA settlers. As has been informed to the Honourable Member through a written reply on 24 October 2023, Clause 5 of the original agreement between FELDA and settlers did not specify a particular value as minimum income, but to assist FELDA settlers, a minimum income value of RM120 per acre has been set for each settler, depending on the land area of the settler.
In addition, settlers' income also depends on the current price of crude palm oil. The gross income of FELDA oil palm settlers will increase in line with an increase in the price of crude palm oil, and vice versa if the current price of palm oil falls.
At present, FELDA management is studying and reviewing the level of minimum income against settlers' income. Several rounds of discussions with settler representatives have also been held. At the same time, FELDA also needs to evaluate the implications of fixing the minimum income level on the financial sustainability of the organisation, especially given the risk of commodity price volatility in the future.
However, FELDA continues to strive and plan various specific initiatives to control settlers' plantation operating costs to an optimal level, by involving increased use of mechanisation, an optimal fertiliser composition with minimal fertiliser prices, and taking advantage of the space of aid funds
disbursed by government agencies. FELDA also welcomes the suggestions of the Honourable Member regarding the provision of fertiliser subsidies, increasing the insufficient labour quota and the use of technology to increase the yield of settlement settlers.
For the information of the Honourable Member, FELDA currently does not provide a fertiliser subsidy facility to settlers. However, for settlers who are with FELDA, FELDA will advance the cost of purchasing fertiliser, which will then be deducted from the monthly yield payment. Independent settlers, who manage their own plots, FELDA only assists with the purchase of fertiliser.
In increasing productivity, FELDA has implemented several alternatives, namely the use of high-quality seeds such as Yangambi ML161 and Yangambi 3 Way, which produce the first harvest in the first 36 months. In addition, the use of mechanisation in plantation activities is also being implemented to maximise the yield that can be harvested from settlers' plantations. To ensure the labour quota is sufficient, FELDA will also resubmit the application for the recruitment of foreign workers to the Ministry of Human Resources in the near future, after the government announced that all applications and approvals for foreign worker study quotas had been deferred previously.
Recognising that technology is very important in influencing the increase in settlers' yields, FELDA has taken several initiatives through the use of modern and latest technology in an effort to increase plantation yields. Among them, the Smart Plantation Management Solution technology and the use of drones for the control of leaf-eating caterpillars are examples of FELDA's success in modern plantation management.
SPMS is a precision agriculture programme, prescient farming, in which data on planting gaps and the health of oil palm trees are used for operational purposes, including fertilisation.
The use of drones for UPD control activities is seen to be more efficient and has higher productivity on large plantations compared with the manual method of trunk injection. Ongoing studies such as stingless bees (kelulut) as pollinating agents and honey production in oil palm plantations, as well as the use of various plantation mechanisms, are being planned for the studies to proceed either in-house or in collaboration with agencies and the private sector.
Among them is through the National Technology and Innovation Sandbox Programme under the Ministry of Science, Technology and Innovation, the Malaysian Rubber Board, public universities and others. Continuous efforts and studies can enable oil palm plantations under FELDA management to produce higher yields. Apart from that, the government remains committed to assisting the settler community by introducing several initiatives and incentives to improve quality of life and safeguard the welfare of the settler community, covering aspects of infrastructure, health, digitalisation and housing as announced by the Honourable Prime Minister during the Settlers' Day Celebration 2023 on 7 July 2023.
Among the initiatives announced by the Honourable Prime Minister are:
(i) Rahmah Health Contribution Incentive, RM300 for settlers aged 65 and above through a fund of RM21.2 million benefiting 70,715 settlers;
(ii) construction of 12 haemodialysis centres in all FELDA areas, including a foundation in Kelana Jaya through a fund of RM21 million benefiting 2,000 patients;
(iii) provision of allocation to expedite the remaining 283 neglected FELDA new generation housing units;
(iv) provision of 30 digital economy centres throughout the country and holding the long-term FELDA Foundation College programme in Kelana Jaya;
(v) a project to install 37,012 street lights across all FELDA areas through an allocation of RM7.7 million starting in 2024; and
(vi) diesel subsidy of RM36 million a year to cover energy generation and water treatment operations, benefiting 43,000 settlers.
That is all, thank you.
Thank you for the answer from the Minister's side. I invite the Honourable Member for Hulu Selangor to ask the question, just one, okay.
Thank you, Mr Speaker. We are neighbours sitting next to each other, aren't we.
[Laughter] Okay, thank you, Mr Speaker, and thank you to the Honourable Minister for the very solid explanation, and indeed we know Dato' Sri Azalina Othman, what kind of person she is. This small person here. My Dato' has been with me in this Parliament for almost a year, and I have been with the settlers.
I have four FELDA clusters in Hulu Selangor, and I think about One Malaysia, actually. I have gone into the villages, I have gone into FELDA, I have gone into the plantations. I have seen for myself what is done on their own and what is done together with FELDA. That means, roughly, this is done, then it is empty, then it is vacant, and goes back to this existing place. So, I see that this is something we need to take, people call it an initiative, to do something.
From that angle, I state that one thing we need to look at to help these people. RM1,200 is indeed not capped, but I feel it is a value that is quite low, which we might possibly think about. I have met FELDA Wilayah, I have met FELDA in their respective places and I have met settlers. I do not take listening to just one side, no.
I do not hear just one side; I hear from the settlers, from the supervisors, and all the way up to FELDA Wilayah.
Alright, for my question, Mr Speaker. FELDA is a large-scale socio-economic entity. It needs to be focused on especially when it touches on the yield of settlers, and it is also a national revenue. When placed under Law and Institutional Reform ꟷ sorry, this is my view.
I do not see it as a priority in discussions because I have raised this issue twice, and it has not even been brought up in discussions. Only questions and answers.
I would like to ask, could the Honourable Minister propose again to the Honourable Prime Minister to place FELDA under a specific ministry such as the Ministry of Economy or any other ministry suitable for it? That is all, thank you.
Thank you.
I request the answer from the Minister's side.
Thank you, Honourable Member for Hulu Selangor, for giving great hope to the FELDA community, especially in terms of who is responsible. I have answered many times in Parliament. I am indeed in charge of Law and Institutional Reform ꟷ which means I am not in charge of FELDA; I only answer on behalf of the Honourable Prime Minister, who is responsible for matters relating to the Prime Minister's Department, under which FELDA falls.
That is why in my answer, if we read or listened just now, many things can be announced because the Honourable Prime Minister is also the Minister of Finance. For me, this is a bonus for the FELDA community. If I were the one announcing for FELDA, it would only be Law and Institutional Reform.
[Laughter] I too am a people's representative who looks after voters from 10 FELDA schemes within the Pengerang Parliamentary constituency, and the question of the Honourable Member, many questions like this are asked by settlers who may or may not vote, yes ꟷ that this is the FELDA issue all the time.
That is why I will inform the Honourable Prime Minister. But I have also been informed that this time many changes will take place for FELDA, God willing, next year ꟷ in 2024, especially with the approval of Budget 2024, God willing, at the policy level this afternoon. Perhaps the Honourable Member and your bloc will support this Budget 2024. More priorities can be felt together by the people, especially the FELDA settlers.
God willing, all good things come from Allah SWT. Thank you, Honourable Member for Hulu Selangor.
Not Hulu Langat.
Yes, that's right, I was reminded of Hulu Langat. Thank you to the Honourable Temporary Speaker. Wabillahi taufik walhidayah wassalamualaikum warahmatullahi wabarakatuh.
[Speaking without microphone]
Maybe it's the one who's missing someone.
Thank you to everyone.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Status of Power Reduction and Handover of Bintulu PortSpecial Chamber
Thank you. So I have to carry on as temporary Speaker, how are you?
Mr Speaker, to the Honourable Deputy Minister of Transport, I would like to draw the Honourable Deputy Minister's attention to an issue that is important to the people of Sarawak, namely the return of the Port of Bintulu, which is now under the control of the Federal Government, so that it is operated by the Sarawak State Government.
Therefore, I hope the Honourable Deputy Minister can present the latest status of the negotiations between the Federal Government and the Sarawak State Government, as well as the issues arising from those negotiations.
Thank you.
Thank you to the Honourable Bandar Kuching. I lived in Bintulu in 2002, and among the places I used to frequent was this Port of Bintulu. So I am quite interested in hearing the answer from the Deputy Minister's side. Please.
Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Mr Speaker — a policy for now, all temporary.
[Laughter] Thank you, Honourable Bandar Kuching. Mr Speaker, before I answer this, what were you in Bintulu before, as what?
Jurutera.
Engineer at Petronas?
Ya.
Oh, okay. Thank you, Mr Speaker.
[Laughter]
[Speaking without loudspeaker]
Mr Speaker, for the information of the Honourable Members, the ministry is looking at this matter from the aspects of staffing, finance, the concession agreement, the Bintulu Port Development Plan, and also from the legal aspect. Accordingly, this ministry has set up a special committee at Minister level and a working committee at officer level, comprising representatives of the Federal Government and the Sarawak Government.
For the information of the Honourable Members as well, the purpose of establishing this committee is to serve as a platform for the Federal Government and the Sarawak Government to exchange relevant information regarding the Sarawak Government's intention to change the status of the Port of Bintulu from a Federal Port to a State Port. The discussions to be carried out are, among other things, to obtain further information from the Sarawak Government on the method of taking over the Port of Bintulu.
Once the information has been properly studied and refined together with the Sarawak Government, the results of that study will be elevated to the Special Committee, whose members comprise the Minister of Transport, the Minister in the Prime Minister's Department (Sabah and Sarawak Affairs and Special Duties), the Deputy Premier of Sarawak, and the Minister of Infrastructure and Port Development Sarawak.
After the Special Committee meeting has been held and the study of the results of that meeting is complete, this ministry will prepare a Cabinet Memorandum to be prepared by the Ministry of Transport Malaysia to report the findings of the discussions and to obtain the consideration and approval of the Cabinet. Thank you.
[Bangun]
I have not invited you yet, please sit down for a moment. Thank you for the answer from the Honourable Deputy Minister. I ask my friend, Bandar Kuching, to ask a question.
Deliberately giving me a bit of exercise, I see.
[Laughter] Thank you, Deputy Minister, once again for the very good answer from my colleague from Sarawak. Have you ever been to Limbang? It is actually a beautiful place. My mother was actually born in Limbang, a Limbang person.
So I have studied the answer given just now. It is indeed an answer we have been waiting for, because this is an issue that is close to the hearts of the people of Sarawak. So I just want to ask what exactly is the progress of those discussions?
It is said that a committee has been set up. When will this committee meet again? What is the timeframe for this MGM? What formula is actually being considered? Is it, with permission, a percentage sharing, or like what was done with the Bakun Dam, where an agreed value was paid by the Sarawak State Government to the Federal Government? Or what formula will be used? With that, thank you.
Thank you for the answer. There are many questions, but God willing they can be answered by the Honourable Deputy Minister.
Mr Speaker, so that we do not feel sleepy this afternoon, Mr Speaker, Limbang has yellow durian. It is different from the usual ones, so come to Limbang to eat yellow durian.
We will come, we accept the invitation.
[Laughter] Thank you, Honourable Kuching. What actually is the case at this time is that the first meeting, which was actually supposed to be held yesterday, but because of both parties, perhaps there were other commitments that needed to be attended.
The working committee meeting was supposed to be held yesterday.
So, if the new date has already been issued, I am informed that this meeting will be held. In that meeting, as I mentioned earlier, that is where we will gather all the information about all of this, as I said earlier: the agreement, the legislation, the development plan, staffing, and so on.
What is the stage of shareholding as it currently stands. So all that. Yes, yesterday we could not. I am informed that it may be held in early month too, and God willing from there it must also be presented under the MA63 Negotiations to bring this matter forward.
But God willing, we are confident this matter will certainly continue, of course. That timeline I cannot give until this working committee has deliberated and also once it has been elevated to be brought to a meeting as one of the agenda items under MA63 and perhaps will be decided later in the Cabinet Meeting. Only from there will we know the time
frame and so on, after that meeting. But God willing, this is already has been decided, with permission, to take over like Bakun previously.
I am confident, God willwilling — I don't think it will not be dragging exercise.
It will certainly be implemented as quickly as possible, with such care and smoothness, this transfer, God willing. Thank you.
Thank you, Honourable Deputy Minister and Honourable Kuching.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Upgrading the Operations Building, Facilities and Welfare of Teachers of the Community Rehabilitation Programme (PDK)Special Chamber
Thank you, temporary Mr Speaker, thank you, Deputy Minister.
Mr Speaker, Hulu Selangor would like to touch on the Community-Based Rehabilitation Programme (PDK). The total number of this programme implemented across the country is 559 PDK. I apologise if I am wrong, but in Selangor there are 58 PDK, and in Hulu Selangor alone there are nine PDK, which is among the highest in Selangor.
The PDK programme is humanitarian in nature and aims to guide special groups until they become self-reliant, and it has been proven that they have succeeded in producing products for marketing such as mushrooms, handicrafts and so on. PDK also forms children before they enter national schools to be placed in Special Education Classes.
I would like to relate matters concerning the operating buildings of PDK. It is understood that there are still many PDK operating by renting buildings rather than owning their own buildings for operations.
Some use halls, some use old buildings, some are in hilly areas, and there are cases where PDK had to move out to find new buildings because the premises were needed. I propose that the ministry look at this issue seriously to obtain their own buildings that are safer and more suitable.
Next, I would also like to touch on the facilities available at PDK. They are special places to help persons with disabilities (OKU) obtain training and appropriate rehabilitation based on their needs and the type of condition they face, as well as to train self-reliance among OKU.
Certainly PDK requires sufficient facilities that are suitable to the circumstances of OKU participants so that they can carry out activities. I ask the Ministry to review the facilities available at every PDK throughout Malaysia and endeavour to provide sufficient budget for each PDK, not only for facilities but also funds for activities and programmes to be carried out.
I propose that the ministry establish a "one stop centre" for each state for PDK to showcase the work of PDK students such as handicrafts, agricultural produce and so on. If it is not suitable according to state, it can be done according to the area where the product's importance can be introduced and needs to be promoted. Given the current economic situation and high prices of goods, I hope the ministry will review the allowances given to PDK supervisors and staff. The supervisor allowance, which is RM1,500,
and the staff allowance of RM1,200 are not sufficient, and I have seen for myself that the work done by PDK teachers in educating these special groups is not easy.
I ask the ministry to pay attention to the matters mentioned so that the welfare of all PDK members is better guaranteed. I hope the ministry can jointly think of the best solutions for the good of the educators and these special groups. Thank you, temporary Mr Speaker.
Thank you, may you last long, insya-Allah.
[Laughter] Thank you, Honourable Hulu Selangor.
Answer from the Honourable Deputy Minister. Please.
Bismillahi Rahmani Rahim [Reciting selawat] Mr Speaker, first of all I would like to record my thanks to the Honourable Hulu Selangor for his concern regarding the Community Rehabilitation Organisation (PPDK).
Based on the question from the Honourable Member just now, I can summarise the Honourable Member's question, which raises four questions and four main matters.
The first is a request for the ministry to identify PDK buildings that are safer and more suitable. Second, a request for the ministry to review the facilities available at every PDK throughout Malaysia, as well as to provide sufficient budget for each PDK, including facilities for activities and programmes to be carried out. Third, a request for the ministry to establish a one-stop centre for each state for PDK to showcase the work of PDK students, such as handicrafts, agricultural produce and so on. Fourth, a request for the ministry to review the allowances given to supervisors and staff and also trainees.
Mr Speaker, before I answer the four matters raised by the Honourable Member, allow me to briefly inform you about the Implementation Concept of the Community-Based Rehabilitation Programme (PDK) currently being practised by the ministry through the Department of Social Welfare (JKM).
First, as the Honourable Hulu Selangor is well aware, the Community-Based Rehabilitation Programme (PDK), or Community-Based Rehabilitation Program (CBR), is a strategy in community development for rehabilitation, equalisation of opportunities and social integration for Persons with Disabilities.
Second, this programme is implemented through a multisectoral approach through the active involvement of OKU, families and local communities, supported by non-governmental organisations (NGOs), the private sector, government agencies and local leaders. Third, the focus of the programme at PDK is on OKU who require rehabilitation and basic training in terms of mobility, speech and skills in daily living activities.
Fourth, the Development and Welfare Programme for OKU is the responsibility of all parties. It does not depend solely on the government. The government is ready to lead and assist, whether in terms of finance or advisory services, to PDK organisations. It also indirectly opens opportunities and space for the community to be involved comprehensively
in the development of OKU, because throughout their rehabilitation at PDK, OKU are not separated from their families and the communities where they live.
Fifth, each PDK is managed by a supervisor, either one or several staff members, and then there are several trainees. For information, OKU who attend this PDK are termed as "trainees".
Sixth, the PDK programme is open to all OKU who are Malaysian citizens and registered with JKM and who require rehabilitation and training regardless of age limit, gender, race and also religion. Seventh, the PDK programme is also an alternative and serves as a complement to special education that is specific to OKU, including those with moderate disabilities as well as high disabilities.
Mr Speaker, to answer the Honourable Hulu Selangor's first question regarding identifying safer and more suitable buildings. I am pleased to inform the Honourable Member in this Special Chamber that whether a building or location is to be used as a PDK must be located in a strategic community area that is easily accessible to OKU and the families involved. The selection of premises is made by the PDK organisation itself according to the suitability of the programme and activities carried out.
Meanwhile, the ownership of buildings is at the initiative of each PDK organisation that mobilises any PDK in local communities.
There are PDKs built using state government allocations, as in the states of Kedah and Johor.
Accordingly, the Federal Government, and we at ministry level, greatly welcome cooperation from all parties, including state governments and the private sector, in providing safer and more suitable premises for the welfare of OKU, and it is the role of all of us, including as Honourable Members, to engage either with state government authorities or private parties, or any other parties who wish to be involved in making this programme a success.
Mr Speaker, next is the second question raised by the Honourable Hulu Selangor, which concerns reviewing the facilities available at every PDK throughout Malaysia, as well as providing sufficient budget for each PDK, including facilities for activities and programmes to be carried out.
For the information of the Honourable Member and the august House, with reference to allocations to PDK, the government is always caring and endeavours to provide the best facilities for the development of OKU. As of October 2023, there are a total of 566 PDKs benefiting 19,002 OKU across the country, with 565 supervisors and 2,782 staff members.
In 2023, the Federal Government allocated nearly RM108.7 million to PDK organisations, which are Voluntary Welfare Organisations (PSK) registered under the Registry of Societies (ROS).
This allocation covers:
(i) Special Allowance for OKU Trainees;
(ii) honorarium payments to supervisors and staff;
(iii) premises rental;
(iv) utility payments;
(v) purchase of equipment (for newly established PDK only); and
(vi) including programmes and activities held at every PDK.
Mr Speaker, next is the proposal raised by the Honourable Hulu Selangor regarding establishing a one-stop centre for each state for PDK to showcase the work of PDK students.
For the information of the august House and the Honourable Member, at present the ministry has already developed a one-stop centre known as ProWell, which functions as a collection and marketing point for all products produced by the ministry's target groups, including persons with disabilities.
ProWell operates at the Industrial Training and Rehabilitation Centre (PLPP) Bangi.
ProWell is an economic empowerment initiative for target groups which also provides a platform for people with special needs from PDK, residents of welfare institutions and recipients of JKM financial assistance to market products such as rattan products, batik, songket and so on.
Therefore, regarding the Honourable Hulu Selangor's proposal for a one-stop centre in every state, the ministry welcomes the proposal. For information, so far this initiative has been started at the State Department of Social Welfare of Pahang, namely at PDK Ceria Bentong. Later we can invite the Honourable Member to come and see it together.
Mr Speaker, the last question raised by the Honourable Hulu Selangor concerns reviewing the allowances of PDK supervisors and staff. I am pleased to inform you that the government approved an increase in honorarium payments to PDK supervisors and staff in January 2021, just recently. Accordingly, this increase in honorarium payments has benefited 565 supervisors and 2,782 PDK staff, which we are confident and believe has to some extent eased their burden.
The old rate for supervisors before the increase was RM1,200. We raised it to RM1,500. The old rate for staff was RM800 and we raised it to RM1,200. At the time we raised it, the minimum wage remained at that rate, Mr Speaker. Accordingly, I would like to stress that we review it from time to time, and that there are no problems, and it also depends on the country's financial position.
Mr Speaker, the ministry encourages the PDK Committee to seek additional funds to finance other expenditures, including to increase honorarium payments to PDK supervisors and staff through projects implemented under the Economic Empowerment Programme. This programme has already been introduced at all PDKs since 2013. Several PDKs have succeeded in generating encouraging income through this programme, namely PDK Malindo in Melaka and PDK Wakaf Tapai in Terengganu. They have given allowance increases to their supervisors and staff higher than what we have set.
In addition, PDKs registered as PSK may also seek funds through contributions from corporate bodies and private parties. Accordingly, PDKs that are capable may pay staff and supervisor allowances at a better rate. PDKs are not necessarily bound to the payment of RM1,200 to staff and RM1,500 per month to supervisors given at present.
Mr Speaker, I would like to inform this esteemed Special Chamber that, as an effort to continue encouraging greater participation of OKU in PDK, the ministry is also implementing field visit programmes for
further publicised information relating to PDK, such as the PDK Mini Carnival Programme in every state and the Jom Daftar OKU Programme.
In addition, publicity on PDK during the annual OKU Day celebrations is also carried out to continue promoting PDK services and products to the general public. This programme involves the PDK Committee, supervisors, staff, trainees, the local community and local leaders. Information on PDK can also be accessed by the public for viewing and information through the Department of Social Welfare (JKM) website.
Mr Speaker, in conclusion. Honourable Members, the ministry always strives to provide only the best to OKU as stipulated in the Convention on the Rights of Persons with Disabilities.
Therefore, through the PDK programme that has been developed in a structured manner and has received firm cooperation from all parties, it is hoped that more OKU can become independent and have their social functioning restored, so that they can ultimately be reintegrated into society.
The ministry also calls on all parties to welcome the efforts that the government has implemented thus far for the welfare of OKU, based on the concept of “Kebajikan Adalah Tanggungjawab Bersama”.
Finally, the ministry takes this opportunity to once again thank the Honourable Member for his concern in asking this question. Thank you, Mr Speaker.
Thank you for the answer given by the Honourable Deputy Minister just now.
The Member of Parliament for Hulu Selangor is invited to ask the supplementary question.
Thank you, Mr Speaker, God willing, I will remain standing. Thank you, Honourable Deputy Minister, for the very solid answer. I have known him for a long time already. He may not know me, perhaps, but I have known him for a long time and people do say that he is quite understanding in terms of welfare matters.
So, what was explained is indeed accurate, and I am confident that he is assisted by people with expertise. But at the same time, as the Honourable Deputy Minister said, and as I myself did in the case of the FELDA issue earlier, I went to see for myself, I monitored for myself, I studied for myself, and I, together with the committee, saw for myself what their needs are and so on.
So that is why what I raised was based on needs. I am not taking up other people's issues, no. I myself. Alright.
Next, my question, Mr Speaker, while God willing I remain standing. Is the ministry not planning to provide initiatives to the PDK Management Committee? They are also people who play an important role behind the administration of this committee, apart from those involved as managers and staff. PDK committee matters, such as meeting attendance allowances and so on, considering that this committee also forms supervisors and PDK staff. Likewise, is the ministry not planning to send some of these special groups who are able to be independent to TVET programmes suited to their skills, because I say there are among them who are not OKU but truly cannot work. They can move much further. I request an answer from the Honourable Deputy Minister. Thank you, Mr Speaker.
Thank you for the supplementary question. The Honourable Deputy Minister, please.
Mr Speaker, I believe that some of what I have said was already answered in my first reply. However, I may need to emphasise that the Community-Based Rehabilitation Organisation (Pertubuhan Pemulihan Dalam Komuniti, PDK) is a non-governmental organisation registered under the Societies Act 1966 (Akta Pendaftaran Pertubuhan 1966). The PDK organisation committee may determine the rate of allowance payment as applied for, based on the financial position of each organisation, provided it has additional funds. In other countries, these NGOs are actually very advanced in assisting the government in providing services to our target groups, who consist of the people.
At present, Mr Speaker and Honourable Members, the government only provides financial allocations to cover special allowances for OKU trainees, honoraria for supervisors and staff, rental of premises and payment of utilities, and part of the programmes held at PDK.
This allocation is a form of government support for the welfare and development of OKU who are in great need.
However, from what I have seen when I go down to the ground, Mr Speaker, there may be programmes to empower the NGOs themselves that drive PDK, which we need to help so that they can expand their engagement and then strengthen it. That is something we may take into account, Honourable Member. In fact, community leaders, including our Honourable Members, can play that role in empowering this PDK so that it can likewise provide the best.
Mr Speaker, for the second question, the ministry strongly encourages PDK trainees to pursue their interest in education and Technical and Vocational Education and Training (TVET).
Various education and skills pathways have already been provided to PDK trainees who have high capability and functioning. Apart from mainstream education under the Ministry of Education Malaysia, community colleges and polytechnics under the Ministry of Higher Education, Giat Mara under the Ministry of Rural and Regional Development, Pusat Latihan Perindustrian dan Pemulihan Bangi under this ministry itself, as well as many other public skills institutions, have already provided opportunities for OKU to take skills and vocational courses suited to their abilities. Whatever we want to do ultimately depends on their capabilities. We cannot force them at all.
PDK trainees who meet the requirements and qualifications are encouraged to apply for the courses offered, with assistance and guidance from the PDK.
Mr Speaker, finally, I think this PDK is a programme that is truly good for our target groups, especially since the WHO has already stated that for every country in the world, ten out of 15 per cent of the population are indeed persons with disabilities.
However, in our country's situation, registration is only at 2.08 per cent.
Therefore, it is the responsibility of all of us, Honourable Members, including all communities, to work together to register them, because it is from that data that the government can draft a specific strategic plan to develop our fellow Orang Kurang Upaya. Thank you, Mr Speaker.
Thank you for the answer from the Honourable Deputy Minister. For everyone's information, one of my children is also registered under OKU.
Honourable Members, with that, the speech session under the Motion on Governance Matters under Standing Order 17 today has ended. I hope that all Honourable Members can hold a engagement session after this with the Deputy Minister, whether formally or informally, to show that the session does not stop here.
Most importantly, we can resolve the problems of the people raised by the Members of Parliament concerned. The Special Chamber today is adjourned until Monday, 6 November 2023 at 2.30 p.m. Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera.
[The Special Chamber ended at 3.25 p.m.]