(Opening)

[Mr Speaker presided over the Sitting]

Oral QuestionsQuestions

Mr SpeakerEN

Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. We begin the Questions for Oral Reply session by inviting Tuan Khoo Puay Tiong, Kota Melaka.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Tan Sri Speaker. I would like to extend Happy Birthday greetings to our Deputy Minister who will be answering the question shortly. Tan Sri Speaker, I am Kota Melaka, question number one. Thank you.

Khoo Poay TiongDAP · PHKota Melaka · questionEN

1. Tuan Khoo Poay Tiong [Kota Melaka] asks the Minister of Investment, Trade and Industry to state the steps the government is taking to encourage local industry players to step up efforts to manufacture electric vehicles to meet local demand for electric vehicles in order to achieve the SDG 2050 target.

Mr SpeakerEN

Thank you. Minister, please. Happy 28th Birthday, okay.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

Thank you, Tan Sri. [Laughter] Thank you, Tan Sri, thank you, Kota Melaka. Allow me to make a small correction, namely that the United Nations has targeted achieving the United Nations Sustainable Development Goals by 2030 and not 2050...

Mr Speaker

Okey.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

However, our country has set a target of achieving net zero carbon emissions, or net zero, by 2050. One of the targets of the national energy transition roadmap (NETR) is to achieve xEV sales of 80 percent of total industry volume (TIV) by 2050. The government has implemented several initiatives to encourage local companies to step up efforts to manufacture electric vehicles to support the development direction of the local automotive industry. Among the fiscal initiatives offered by the government are: (i) full exemption from import duty and excise duty for CBU imported EVs until 31 December 2025 as well as exemption

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

from full import duty, excise duty and sales tax for EVs manufactured domestically until 31 December 2027; (ii) income tax allowance or pioneer status exemption for energy efficient vehicles (EEV) manufacturers, including EVs and related critical components; (iii) road tax exemption for EV users until 31 December 2025; (iv) provision of green investment tax allowance (GITA) to charging point operators who meet the tax incentive criteria for tax exemption in the form of allowance, an investment tax allowance of 100 percent for a period of 5 years; (v) income tax exemption on statutory income for companies manufacturing EV charging equipment from 2023 to 2032; and (vi) individual income tax relief of up to RM2,500 for the installation or subscription of home EV charging facilities for years of assessment up to 2027. In addition, several initiatives have also been introduced by the government for the development of the EV ecosystem in support of the development of the EV industry, as follows. I will give this in writing, thank you.

Mr SpeakerEN

Okay, Kota Melaka.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Tan Sri Speaker, thank you to the Deputy Minister for the answer given. Tan Sri Speaker, with the emergence of Proton, yes, the first national car some time ago, where we wanted to protect the automotive industry, we already have an automotive industry protection policy. So, we see the result is that this national car cannot go far, and we also see that the people are forced to buy cars at high prices because of import duty, yes. So, my question is, given that recently e.MAS alone announced that the first EV made in Malaysia is RM120,000, and another MITI policy is that imported EVs cannot be less than RM100,000. So, in view of such a situation, in the coming era, as we move towards EVs, do we still want to practise such protection policies? Because if we want to encourage the people to shift to EVs, I think EV prices need to be more competitive, yes, where I see that generally in the world outside it is about RM80,000. They can already own a good EV. So, what is the view of the ministry? Thank you, Tan Sri Speaker.

Mr Speaker

Baik, Menteri.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you, Tan Sri, thank you, Kota Melaka. Our policy and direction is to ensure that EV cars under RM100,000 are at least-

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

assembled here. So, our policy is to ensure that at least CKD is assembled in Malaysia if it does not exceed RM100,000. Because this market is big and the Malaysian car market is indeed big. Last year, Malaysia sold 799,000 cars compared with Indonesia. Indonesia is a big market with a very large population, but Indonesia only sold 1.1 million cars last year.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

So, our market is big. We want to use that big market to ensure that at least what is assembled and sold here, especially those under RM100,000, also brings industrial development. So, it has industrial development, and there are also car sales. Thank you.

Mr SpeakerEN

Okay. Kubang Pasu.

Thank you, Mr Speaker. This is my supplementary question. Before that, I want to wish happy birthday to my friend the Deputy Minister. I don't know how old, I don't know. Tan Sri Speaker, access to charging stations. Access to charging stations is very important for the smooth running and success of EV development for the country. The success of EVs depends greatly on the EV ecosystem and the development of EV charging infrastructure. The government's earlier target was 10,000 EV charging stations by 2025, but now we have changed it to 4,000, and the 10,000 has been changed to 2030. The target for EV charging stations should be determined according to current needs in terms of EV sales volume. In Europe, Tan Sri Speaker, there are countries whose EV sales are declining due to insufficient charging stations. In 2024 up to June, 10,663 units, or 2.6 percent of total passenger car sales, were EVs, an increase of 142 percent compared with 2023.

Mr SpeakerEN

Okay, Kubang Pasu. So my question...

The question, Tan Sri Speaker, [Laughter] you are already so eager, Tan Sri. This morning, give me some time. The question is, first, what strategies and measures are being and will be taken by the government to ensure that the development and number of EV charging stations are aligned with and sufficient for the increasing need for EVs in the country? Second, just second. There is no third, Tan Sri. Apart from the limitations of supporting infrastructure such as EV charging stations, which are mostly concentrated in big cities such as the Klang Valley and also Penang. Now I can't even open my paper. What is the government's approach to developing EVs and charging stations for suburban or rural areas, which will certainly take time to achieve investment returns in the context of EV use and sustainable mobility? Thank you, Tan Sri Speaker.

Mr SpeakerEN

Okay, thank you. Deputy Minister, please.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you, Kubang Pasu. My age is the same as Putrajaya, my friend. [Laughter] Honourable Member for Kubang Pasu, first, the MITI target remains 10,000 charging stations, but actually the most important thing is not how many charging points. What is important is how many DC charging points. So, MITI has increased the target for DC chargers from 1,000 units to 1,500 units by 2025. So, we hope there will be charging. Now there are 500. We hope it can reach 1,500 DC because DC is a fast charger. The second point is that there are many upcoming EVs. There are PHEVs, plug-in hybrids. So, they are not only pure EVs but also plug-in hybrids, where petrol and electricity are used together and in harmony. This will help, even though our charging points have not reached very high targets like those in other countries, but PHEV is also one way, or approach, to electrification. The third point is that for districts that do not have charging points at present, MITI is working with the Selangor State Government and the Johor State Government to ensure every district has at least several DC charging points. This is an effort that we have carried out. We hope that after the pilot with Selangor and Johor, we can expand it to all states so as to ensure all districts have charging points. Thank you.

Mr SpeakerEN

Okay. I invite Tuan Syed Saddiq bin Syed Abdul Rahman, Muar.

Thank you, Tan Sri Chairman. My question, question number two.

Syed Saddiq bin Syed Abdul RahmanMUDA · PHMuar · questionEN

2. Tuan Syed Saddiq bin Syed Abdul Rahman [Muar] asks the Minister of Women, Family and Community Development to state whether the ministry has plans to: (a) increase the ceiling for household income of Social Welfare Department (JKM) assistance applicants; and (b) if so, whether this new rate will be set as a benchmark for this new rate to be reviewed annually in line with the national inflation rate.

Dato’ Sri Hajah Nancy binti ShukriPBB · GPSMinister of Women, Family and Society Development · SantubongEN

Thank you, Tan Sri Speaker. Thank you, Honourable Member for Muar. Mr Speaker, the Ministry of Women, Family and Community Development (KPWKM) through JKM is the agency responsible for managing and distributing welfare assistance from the Federal Government to help the survival and ease the burden of eligible and needy target groups. This assistance is temporary until they escape poverty and live independently. Welfare assistance channelled through JKM is based on eligibility and need, namely means-tested. At present, JKM uses the Poverty Line Income (PGK) as one of the basic eligibility requirements for welfare assistance applications. However, I would like to inform the House that PGK is not the only single measure or assessment in considering each welfare application. This is because there are various other factors taken into account to ensure that those who are eligible and in need receive access to the assistance provided by this government, which is indeed intended to help them. Other assessments include aspects of comprehensive family social support such as family dependants, chronic health problems, the need for close care such as for persons with disabilities (OKU), psychosocial and so on. For the information of the Honourable Members, starting January 2024, JKM has begun to use the new PGK, namely PGK 2022, with a threshold value of RM1,198. In the process of reviewing and updating PGK 2022, the Implementation Coordination Unit of the Prime Minister's Department (ICU JPM) and the Department of Statistics Malaysia (DOSM), which is an agency under the purview of the Ministry of Economy, have implemented it together with the household income and expenditure survey (HIES), with permission, and the basic facilities survey. Therefore, I would like to emphasise once again that JKM practises means-testing in assessing each welfare assistance application so that each case is handled by taking into account the actual situation and a broader picture, such as economic factors, locality, capability, namely OKU, bedridden patients and so on. Not merely looking at their total income alone. That is all, thank you.

Dato’ Sri Hajah Nancy binti ShukriPBB · GPSMinister of Women, Family and Society Development · SantubongEN

use the Poverty Line Income (PGK) as one of the basic eligibility requirements for welfare assistance applications. However, I would like to inform the House that PGK is not the only single measure or sole assessment in considering every welfare application. This is because there are various other factors that are also taken into account to ensure that those who are eligible and in need obtain access to the assistance provided by this government, which is indeed intended to help them. These other assessments include aspects of comprehensive family social support such as family dependants, chronic health problems, the need for close care such as for persons with disabilities (OKU), psychosocial needs and so on. For the information of Honourable Members, starting January 2024, the Department of Social Welfare (JKM) has begun to adopt the new PGK, namely PGK 2022, with a threshold value of RM1,198. In the process of reviewing and updating this PGK 2022, the Implementation Coordination Unit of the Prime Minister's Department (ICU JPM) and the Department of Statistics Malaysia (DOSM), agencies under the purview of the Ministry of Economy, have implemented it together with the household income and expenditure survey (HIES), with permission, and the basic facilities survey. Therefore, I would like to emphasise once again that JKM practises a means test in assessing every welfare assistance application so that each case is handled by taking into account the actual circumstances as well as a broader picture such as economic factors, locality, capacity, namely their OKU status, bedridden patients and so on. It is not merely a matter of looking at their total income alone. That is all. Thank you.

Mr Speaker

Sila, Muar.

Thank you, Honourable Minister. Now, there are many agencies, ministries and state governments that help those in need. The Social Welfare Department, zakat, baitulmal. There is also special aid under state governments. Does the government propose to set up a hub or one-stop centre for this welfare assistance so that it can be well coordinated and there is no duplication of assistance or omission? If there were this one-stop centre, perhaps it would be easier to deliver comprehensive assistance to one family so that the family can be lifted out of the poverty trap. Thank you, Honourable Minister.

Mr Speaker

Sila, Menteri.

Thank you, Honourable Member. Actually, so far, there is no such plan because we let it be. We know that apart from JKM, we have zakat, and others that also give.

Tuan Kesavan a/l SubramaniamPKR · PHSungai Siput

[Bangun]

[Bangun]

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

So, we allow that to happen so that it can help. Because, what we see at the moment, I think many say it is not sufficient, especially for those in the city. So, that is why, if you look at it, although perhaps people say this is not enough, we look at how many children they have. What category do they fall into within the family? The mother, perhaps elderly, we also give other aid. Although the head of the family, namely, with permission, does indeed receive it, we allow their child who is OKU to also be in other assistance. So, we diversify that and we allow anyone to receive this so that it can further ease their burden. Thank you, Honourable Member.

Mr SpeakerEN

Okay. I invite Sungai Siput.

Tuan Kesavan a/l SubramaniamPKR · PHSungai SiputEN

Thank you, Tan Sri Speaker. Thank you, Honourable Minister, for the answer given by you to the Honourable Member for Muar, where the Social Welfare Department is an institution that is always close to the community, especially to groups who are in great need of assistance.

Tuan Kesavan a/l SubramaniamPKR · PHSungai SiputEN

So I would like to ask the Honourable Minister of Women, Family and Community Development, whether the ministry plans to set up a Special Committee or a monitoring system to ensure the effectiveness of the implementation of the new rate later? Thank you.

Mr Speaker

Baik.

Thank you, Honourable Member. Within the ministry itself, we have audits. We also have a group to monitor, indeed. For example, those we feel should no longer receive it. But that's how it is. Administratively, we have already done it. There is no committee or anything, Honourable Member. It is just that it is always carried out. That is why it is always monitored in terms of whether there are renewals or not, or whether there are those who have passed away who may still be receiving. So, that has also happened before. But this is what we do to ensure that monitoring is always carried out administratively and internal auditing also takes place. Thank you, Honourable Member.

Mr SpeakerEN

Okay. I invite Tuan Zahir bin Hassan, Wangsa Maju.

Tuan Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Thank you, Tan Sri Mr Speaker. The lift is broken, so climbing the stairs. Wangsa Maju question number three.

Zahir bin HassanPKR · PHWangsa Maju · questionEN

3. Tuan Ts. Zahir bin Hassan [Wangsa Maju] asks the Minister of Natural Resources and Environmental Sustainability to state: (a) the current status of the National Underground Utility Mapping Policy and also the application of the National Utility Database (PADU) by JUPEM; and (b) the status of progress of the legal study related to underground utility mapping in RMKe-12.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

Thank you, Tan Sri Mr Speaker, and thank you, Honourable Member for Wangsa Maju. For the information of the Honourable Members, the Department of Survey and Mapping Malaysia (JUPEM), through the Utility Mapping Division, has carried out a study on the National Underground Utility Mapping Policy. At present, the results of the study are being updated and improved and will be presented to the ministry for the next direction. The National Utility Database was developed in 2006 and covers seven categories of spatial data layers, namely cadastral information, hitografi, transportation, 'hisofgrafi', topography, and utilities, namely electricity, water, gas, oil, sewerage and telecommunications. Information and data on underground utility mapping in PADU are based on sharing by utility supplier agencies such as Indah Water Konsortium Sdn. Bhd., Tenaga Nasional Berhad (TNB), Telekom Malaysia Berhad (TM), Pengurusan Air Selangor, Gas Malaysia, and through data supplied by licensed land surveyors (JTB) as well as JUPEM itself. The National Utility Database is used as a reference source in the management of data and information on underground utility mapping in this country. The National Utility Database data is regulated by JUPEM with quality control, but where measurement and detection are carried out using equipment such as ground-penetrating radar (GPR), pipe cable locator (PCL) and also global navigation satellite system (GNSS) tools. The National Utility Database can help the government to implement planning and development of an area and can be used in disaster cases, especially those involving underground utilities. Data in the National Utility Database is classified as restricted and cannot be shared with the public. Regarding the status of progress of the legal study related to underground utility mapping under RMKe-12: at present, the study is being carried out by JUPEM for a period of two years, from August 2023 to August 2025. This study also involves several ministries, departments, local authorities (PBT), state utility managers and utility provider agencies to obtain appropriate input and suggestions towards providing a legal framework for underground utility mapping in this country.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

This study also involves a review of the Constitution and other existing legislation. Thank you.

Mr SpeakerEN

Okay, I invite Wangsa Maju.

Tuan Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Thank you for the answer given. I am confident that the efforts being carried out show that we are moving in the right direction, we are moving forward in the right direction, with permission. However, we often hear that utility providers do not know or do not have accurate and complete information on the location of their respective utilities. Every time on site, we have to carry out pilot trenching to identify the actual location of the utilities underground. So the question here is, if the information shared by the utility provider agencies is inaccurate and incomplete, how will PADU be able to provide an accurate and complete database as well? Thank you.

Mr Speaker

Sila Menteri.

Dato’ Sri Huang Tiong SiiSUPP · GPSSarikeiEN

Thank you, Tan Sri Mr Speaker, and thank you to the Honourable Member for Wangsa Maju. Through Circular of the Secretary General of the Ministry of Housing and Local Government Number 7 of 2014, local planning authorities must ensure that all new underground utilities installed through open excavation or through horizontal directional drilling (HDD) are measured by a licensed land surveyor during their installation. This shall also be made a condition of approval in planning permission. Licensed land surveyors must submit copies of digital data and utility plans that meet the specifications to the Department of Survey and Mapping Malaysia (JUPEM), in line with the Cabinet decisions in 1994 and 1998 that determined JUPEM would store and manage all underground utility information. In addition, JUPEM has also issued six Circulars on detection and measurement methods and on data formats and specifications to assist all agencies involved. Utility mapping data received from utility provider agencies will be checked against the prescribed data formats and specifications before being updated into PADU. That is all, thank you.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Chairman, Kuala Terengganu.

Mr SpeakerEN

Okay. I call Gua Musang.

Tuan Mohd Azizi bin Abu NaimBERSATU · PNGua MusangEN

Thank you, Tan Sri Speaker.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

This Select Committee.

Tuan Mohd Azizi bin Abu NaimBERSATU · PNGua MusangEN

Based on the explanation given earlier by the Honourable Deputy Minister regarding the National Utility Database system, it can now help the government to plan and develop an area, and can be used for or in disaster cases, especially those involving underground utilities.

Tuan Mohd Azizi bin Abu NaimBERSATU · PNGua MusangEN

I would like to draw the attention of the Honourable Deputy Minister and also the ministry to an issue regarding the sinkhole incident on the Lojing-Gua Musang Road that occurred recently. Was the incident a result of underground utility works in the surrounding area? What action can be taken by the Honourable Deputy Minister? Please explain. Thank you.

Mr SpeakerEN

Okay. Specific questions to the Minister. If the Minister wishes to reply in writing, that is also fine.

Dato’ Sri Huang Tiong SiiSUPP · GPSSarikeiEN

That's fine, thank you. Thank you, Tan Sri Mr Speaker, and thank you, Honourable Member. The reported sinkhole incident that occurred at KM75 Lojing-Gua Musang Road, Kampung Jekjok on 23 November 2024 caused serious damage to the road with an estimated dimension of four metres long, five metres wide and six metres deep. Based on geological information of the incident area by the Department of Mineral and Geoscience Malaysia (JMG), the location is covered with coarse granite rock and a thick layer of residual soil. This incident may be associated with erosion by water...

[Bangun]

Dato’ Sri Huang Tiong SiiSUPP · GPSSarikeiEN

A large amount of surface runoff, especially during the rainy season, seeping into the drainage channels, culverts, located beneath the road layers. This incident may also be influenced by the condition of the damaged culvert structure. Observations also found that no underground utility works were carried out at the sinkhole incident area. However, there are culvert structures and such along the road alignment. JMG will carry out a survey to identify the cause of this incident as a guide for the authorities to take follow-up action and preventive measures for the safety of road users. That is all, thank you.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Tan Sri, one more question. Select committee.

Mr SpeakerEN

Okay. I call Tuan Mohd Hasnizan bin Harun, Hulu Selangor.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Thank you, Tan Sri Mr Speaker. My question number four.

Mohd Hasnizan bin HarunPAS · PNHulu Selangor · questionEN

4. Tuan Haji Mohd Hasnizan bin Harun [Hulu Selangor] asks the Prime Minister to state the efforts and initiatives of the ministry to overcome the problem of online fraud crimes which have caused losses of more than RM2.6 billion in less than three years, in addition to law enforcement actions.

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

Thank you, Tan Sri Mr Speaker.

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

For the information of the Honourable Members, among the efforts and initiatives that have been taken by the government to overcome the problem of online fraud crimes are as follows. With the establishment of the National Scam Response Center (NSRC). The NSRC began operations on 12 October 2022. The effectiveness of the NSRC lies in its operational features, namely enabling fraud victims to make reports easily by simply dialling the hotline number 997. Once the victim's report is received, the NSRC, which is also assisted by financial institutions, is able to trace the victim's financial trail. If the victim's money is found to still be within the banking system, blocking action can be carried out. This blocking action can prevent the disposal of the victim's money and provide an opportunity for the money to be returned to the victim in the future. Second, in addition, the integrated action of the enforcement agencies under the NSRC also enables the modus operandi used by these fraud syndicates to be identified more quickly and further investigations to be carried out more effectively. Third, based on statistics since the establishment of the NSRC on 12 October 2022 until September 2024, a total of 131,036 calls have been received by the NSRC, comprising 52,836 calls involving reports of fraud cases and 78,200 calls where advisory services were given to callers. Fourth, furthermore, as proof of the government's continuous commitment to efforts to tackle online criminal fraud, the government has allocated a grant of RM20 million to the NSRC in Budget 2025 for that purpose. (b), the Semak Mule website by the Royal Malaysia Police. The Semak Mule website was created by PDRM for the convenience of the public in checking bank accounts and telephone numbers linked to police reports or involved in police investigations relating to online fraud crimes. Second, at the same time through the NSRC, from 14 October 2022 to September 2024, a total of 15,106 investigation papers were opened by PDRM for fraud offences under section 420 of the Penal Code Act 574, while 77 investigation papers for money laundering offences were also opened involving the freezing of accounts with money totalling RM75.35 million. (c), blocking of telephone numbers by the Malaysian Communications and Multimedia Commission (SKMM). In addition, SKMM has taken action to block telephone numbers used by scammers. From 14 October 2022 to October 2024, a total of 131 hotline numbers have been terminated for being involved in fraud activities and 112 suspicious telephone numbers have been blocked. Furthermore, SKMM is also cooperating with telecommunications companies to enhance the security of communication and multimedia channels to block the involvement of fake messages and spreading, with permission, malware by syndicates

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

of financial fraud, along with, with permission, blacklisting of telephone numbers involved in financial fraud cases. Finally, Bank Negara Malaysia has set requirements for banks to ensure that their controls and security standards are always at the highest level at all times, especially for internet and mobile banking services. Among the actions under these requirements are the introduction of, with permission, kill switch and the registration of only one mobile device for the detection of online banking transactions. Lastly, Bank Negara Malaysia, with the cooperation of PayNet and the financial sector, has also begun operating the National Fraud Portal (NFP) on 20 August 2024, which is capable of facilitating automation of fund tracing, speeding up the period of detection, freezing and return of funds. Thank you.

Mr SpeakerEN

Okay. Hulu Selangor.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Thank you, Tan Sri Mr Speaker. Thank you, YB Minister, for the answer or explanation just now. If we look at it, RM2.6 billion over these three years is a very large figure. But the answer from YB Minister just now was more of an explanation relating to current issues. The question now is, how do we solve this problem when it has been a problem for decades that has not succeeded in being solved? I take the example of Tabung Haji. Let me take some time, Tabung Haji. How is it that the losses from Tabung Haji mostly involve elderly people who lost this money, who lost the money. So, my question is, what is the government's plan to involve financial institutions in strengthening controls and early detection mechanisms for suspicious transactions to curb the flow of money from victims into criminals' accounts? Thank you.

Mr SpeakerEN

Okay. Please, Minister.

Thank you, Honourable Member. Honourable Member, we need to be aware that various actions have been taken, which I have listed earlier.

[Bangun]

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

But, finally, it is the users of the accounts who are deceived and do not verify. That is one of the major things where if there are any financial changes, immediately do not believe what is told online and so on.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Honourable Minister, just a moment. Most of those who are affected are elderly people. Elderly people, this is our problem.

Mr Speaker

Yang Berhormat.

Honourable Member, that is why several actions have been taken and are being taken. This is not unusual, Honourable Member. This is all over the world. This is a mammoth problem which has to be contained. To strengthen the protection of consumer rights, Bank Negara Malaysia has set requirements for financial institutions to conduct detailed and transparent investigations for every case of financial fraud. Banks are responsible for fully bearing the losses of fraud if they are caused by weaknesses in the bank. That is the answer. Thank you.

Mr SpeakerEN

Okay. I call Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Thank you, Tan Sri Speaker. To the Deputy Minister, my supplementary question, in the context of international cooperation, what is the role of the regional organisation ASEAN in helping its member countries tackle this online fraud crime? Will the government introduce related policies during the period of ASEAN chairmanship next year?

Mr Speaker

Sila.

Honourable Member, thank you for the question. Actually, regionally with ASEAN, we will take the chairmanship, and involvement in scam matters and such has become something that has certainly been discussed before, and this will be continued so that the aim is to eradicate it. Remember, Tan Sri, this is not specific to Malaysia but regionally and worldwide as well. The mastermind worldwide, this kind of system. So, the Honourable Member's proposal will be studied by the government thoroughly. Thank you.

Mr SpeakerEN

Okay. I call Tuan Azli bin Yusof, Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

[In pantun form] Most wise, Tan Sri Mr Speaker, Conducting the House with care, The GISB matter has become a question mark, I put forward question number five.

Azli bin YusofAMANAH · PHShah Alam · questionEN

5. Tuan Haji Azli bin Yusof [Shah Alam] asks the Prime Minister to state: (a) the action taken by the government to restore the faith of leaders and followers of GISBH who are alleged to have deviated from the teachings of Ahli Sunnah Wal Jamaah; and (b) the action taken by the government to look after the welfare of families and ensure the continuity of education for children who have been left behind by GISBH due to Op Global.

Dr. Zulkifli bin HasanDeputy Minister in the Prime Minister's Department (Religious Affairs)EN

Assalamualaikum warahmatullahi wabarakatuh and good morning. Thank you, Mr Speaker. Thank you, Honourable Member for Shah Alam. For the information of the Honourable Members, there have been several questions regarding GISBH before this. Allow me to provide clarification and additional answers. To restore the faith of leaders and followers of GISBH who have deviated from the teachings of Ahli Sunnah Wal Jamaah, the government has launched a 90-day rehabilitation programme voluntarily for all GISBH members. The National Security Council (MKN) and JAKIM, with the cooperation of the Selangor Islamic Religious Council (MAIS), JAIN and the State MKN, began a pilot project on 7 November at the MAIS Rehabilitation House using the MAIS Istitabah module. Evaluation will be carried out every 30 days after the rehabilitation sessions are conducted. Based on this pilot project, JAKIM, with the cooperation of MKN and various agencies, will carry out a rehabilitation programme with a comprehensive module. The module used is coordinated with MAIS, JKM, KPM, KDN, LPPKN, JTK and AKM. The module covers aspects of faith and sharia rehabilitation, education, counselling, health, citizenship and also skills training to prepare for survival after returning to the bosom of society. At the same time, some of the MAIN and JAIN, or state Islamic religious departments, have formed special task forces to organise rehabilitation programmes at the state level with the coordination of JAKIM. The state of Johor was among the earliest to implement rehabilitation programmes for GISBH members in Johor Bahru, Pontian and Mersing. In addition, JAKIM, with the cooperation of the Malaysian Prison Department and PDRM, also organises specific faith rehabilitation programmes for those currently detained. To look after the welfare of families and ensure the continuity of education of children left behind by GISBH, JAKIM together with related agencies such as the Ministry of Education Malaysia, JKM, including state religious authorities, will ensure their welfare is protected and that they can continue their livelihood. JAKIM, with the cooperation of the Department of Waqf, Zakat and Hajj (JAWHAR), has coordinated with the state Islamic religious councils and zakat management agencies to provide financial assistance to them. State Islamic religious councils and zakat agencies may consider forms of assistance to GISBH members who meet the eligibility criteria for assistance, namely those classified under the asnaf ar-riqab, fakir miskin, al-gharimin and fisabilillah. Finally, for the information of the Honourable Members, in terms of education, children currently in shelter homes are already attending formal schooling. Thank you.

Mr SpeakerEN

Okay. Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Thank you, Tan Sri Mr Speaker. Thank you, Honourable Minister, for the very comprehensive explanation. However, I would like to raise a question. It is reported that more than 10,000 members of GISBH are involved in their group. It is now informed that voluntary participation is still too low, yes, even though MKI has issued a fatwa on the deviation of their teachings. So, what are the government's efforts to call on and persuade GISBH members to take part in the rehabilitation programmes run by MKN and JAKIM? In Shah Alam, Tan Sri Mr Speaker, there are already two outlets or restaurants that were previously operated by GISBH that have reopened under different brands. It is good because they want to return to society. But, in terms of their ideological stance, what are our efforts to call them so that they can be rehabilitated? Thank you.

Mr Speaker

Sila, Menteri.

Thank you, Honourable Member for Shah Alam, for your concern about this issue. As we have informed, we already have a comprehensive module covering aspects of education, finance and also skills training. The question is, why is the number who come forward still low? We take note that it is voluntary. Nevertheless, for the children who are still in shelter homes, we continue programmes to provide schooling and also to enable them to follow the true teachings of Islam. What efforts have been made? Efforts have been implemented, among them are the Islamic religious councils as well as JAKIM, and also in cooperation with the state Islamic religious departments, that have offered financial assistance such as daily allowances, yes. Those who attend the rehabilitation programmes will be given daily allowances not only to them but also to their children and wives. Second, we also offer skills training to them. Those who follow this programme will also be given skills training so that they can continue their livelihood and also be given financial assistance as initiated by the religious authorities and also the zakat management agency. Thank you.

Mr SpeakerEN

Okay. Please, Pengkalan Chepa.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Thank you, Tan Sri Speaker. Thank you, Honourable Minister, who has answered the earlier question at length. However, the matter arising from the Deputy Minister's answer just now is that, if they have been arrested, there must surely be an investigation and it is confirmed that there is an offence. But, Honourable Minister just mentioned that rehabilitation for faith restoration is voluntary. So, once they have been arrested and found guilty in terms of faith, there should be a process that is more towards compulsion, not voluntary anymore. One.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Secondly, Honourable Minister, regarding the criteria for the deviant teachings that have been exposed, what is their main criterion? Every time religious agencies make arrests or exposures, what is the main criterion for a deviant teaching? Lastly, Mr Speaker, if it is rehabilitation for children, it is certainly different from adults. So, does JAKIM have specific faith rehabilitation treatment for children?

Mr SpeakerEN

Okay. Please, Minister.

Okay. Thank you to the Honourable Member. For the information of the Honourable Member, as I stated just now, the voluntary programme is for GISB members who have no criminal offences and who have not been arrested. As for those who have already been detained, they must undergo a specific aqidah rehabilitation programme by the Royal Malaysia Police (PDRM), the Malaysian Prison Department and also in cooperation with the Department of Islamic Development Malaysia (JAKIM). That is the first question. For the second question, regarding the criteria: the criteria are actually lengthy, as already prepared by the Research Division of JAKIM and also decided by the Muzakarah. However, I will share some of them here: excessive devotion to leaders to the extent of regarding leaders as infallible prophets, fully manipulating the naivety of subordinates to fulfil the wishes of superiors, lying in the name of Allah, Rasulullah and other deceased figures, teaching followers to become fanatical by habitually practising certain acts as a sign of loyalty, and many more. So, that one we can share with the Honourable Member regarding the criteria. Lastly, regarding the children just now. Actually, there is already provision under this rehabilitation plan. It follows the levels, yes, whether by severity or by suitability. Therefore, for these children, the level of rehabilitation is certainly according to the children's suitability, as already modulated by JAKIM in cooperation with religious authorities. Thank you.

Mr SpeakerEN

Okay, thank you. Next, I invite Dato' Seri Dr. Shahidan bin Kassim, Arau.

Soalan tambahan.

Mr SpeakerEN

Okay, thank you. Next, I invite Dato' Seri Dr. Shahidan bin Kassim, Arau.

I intend to ask a supplementary question. I want to ask Ayah Pin, was he arrested first?

Mr SpeakerEN

No, no. Question number six.

Thank you. Folk of Kimanis, Arau likes to exercise, Starting as early as six in the morning, My question is number six, Topic: Beting Patinggi Ali.

Question number six with amendment 6(b), from "duta" to "nota", okay.

Shahidan bin KassimPAS · PNArau · questionEN

6. Dato' Seri Dr. Shahidan bin Kassim [Arau] asks the Minister of Foreign Affairs to state: (a) the government's plans in countering the intrusion into Beting Patinggi Ali that has occurred since 2013; and (b) what alternative measures should be implemented, given that the approach of China Coast Guard vessels has had no impact, and diplomatic 'duta' negotiations have also been ineffective because China does not recognise UNCLOS.

Mr SpeakerEN

Okay, thank you. Is there an amendment to the question, okay? Is there an amendment?

No, that sentence. That word. He wrote "duta" but it should actually be "nota".

Mr SpeakerEN

Oh, okay. Okay.

Diplomatic "nota", not "duta", okay.

Mr SpeakerEN

Okay, thank you.

Whether I am wrong or someone else is wrong, I don't know. Wallahualam. Sorry, okay.

Mr Speaker

Baik, Menteri.

Datuk Mohamad bin AlaminUMNO · BNDeputy Minister of Foreign Affairs · KimanisEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you Mr Speaker, and thank you also to Arau for the question raised this morning and for the concern shown towards issues involving the Ministry of Foreign Affairs, particularly issues involving the South China Sea. Tan Sri Speaker, as this august House is well aware, the issue of the South China Sea is a complex and sensitive issue that must be handled carefully, thoroughly and comprehensively. Every action taken by the government is based on comprehensive consideration and will never gamble with sovereignty, sovereign rights and the interests of the nation. The government always takes seriously the security of the nation's waters in the South China Sea, including in the area of Beting Patinggi Ali. The government constantly monitors closely any developments and current situations in the area, with the involvement and cooperation of various relevant ministries and agencies, to ensure the issue is addressed promptly and efficiently without causing any tension on the ground. The Malaysian Government, through the National Security Council (MKN), the Royal Malaysian Navy (TLDM) and the Malaysian Maritime Enforcement Agency (APMM), always gives serious attention to security in the nation's maritime waters. The actions taken include patrols, surveillance, monitoring and enforcement within Malaysia's maritime area, to demonstrate presence or, with permission, show off present in the area. All maritime enforcement and monitoring agencies

Datuk Mohamad bin AlaminUMNO · BNDeputy Minister of Foreign Affairs · KimanisEN

within the country are highly committed to ensuring that the level of Malaysia's sovereignty and interests remains preserved. The government also implements a whole of government approach, with permission, to coordinate the actions taken by the government to guarantee the sovereignty and security of Malaysian waters. Every government agency plays its respective role to ensure that the nation's interests are always defended. The implementation of periodic patrols and operations by the national security forces aims to ensure that the security of the nation's economic activities, such as hydrocarbon exploration and exploitation activities in the area, is always preserved at all times, while defending the nation's sovereignty. Regarding incidents of intrusion by vessels belonging to foreign countries into Malaysia's maritime area, the Ministry of Foreign Affairs has consistently issued, and will continue to issue, notes of protest to the countries concerned if the vessels and assets owned by the governments of those countries are found to have intruded into the nation's waters. This is in line with the nation's firm stance in ensuring that our sovereignty, sovereign rights and interests are preserved. This is also in line with the nation's firm stance that all parties must avoid actions that may cause tension and are provocative, and must adopt an approach of, with permission, self-restraint. The government also consistently affirms Malaysia's position in every meeting with foreign countries at various levels, including at the level of national leaders down to working group level. As Chair of ASEAN next year and Country Coordinator for ASEAN-China Dialogue Relations from August 2024 to July 2027, Malaysia remains committed to resolving issues relating to the South China Sea constructively, using appropriate diplomatic forums and channels. The Ministry of Foreign Affairs will continue to voice Malaysia's firm position on issues in the South China Sea on relevant platforms to ensure that the nation's sovereignty, sovereign rights and interests continue to be preserved. Thank you.

Mr Speaker

Sila, Arau.

Tan Sri Speaker, I read this question. The Honourable Member need not answer it, because I think it cannot be answered, as this is a bit difficult, okay. How does Wisma Putra view Malaysia's role in the ASEAN Chairmanship 2025 as a platform to demonstrate Malaysia's firmness in defending the nation's maritime rights in the face of China's maritime boundary claims within the Nine-Dash Line, which are clearly invalid and contrary to UNCLOS? Does the government intend to update Malaysia's maritime map to clarify Malaysia's maritime boundaries, which form the nation's sovereign area in the South China Sea? Okay, Tan Sri Speaker, thank you. I am not – the Honourable Member is good, but I want to tell you, this answer has been answered many times. No action has been taken on the Beting Patinggi Ali area. The Honourable Member himself has never gone there.

Nobody has ever gone there, these people. They don't want to go. Go and see for yourself that we are prohibited from operating the PETRONAS oil well that was built 10 years ago. If it's orange, is it PETRONAS, Tan Sri? Because that building is colour orange, not this colour. Colour orange but not operating. Back when I was Minister, I asked for it to be turned into a hotel. Why? Because it is not being used and not operating, and there are complaints from local fishermen that the coast guard vessel says, "Don't come here, this is our area." So, the area 80 kilometres from Sarawak, where there are only ships over there, and then our ships monitor them. But what action is taken to chase them out? That is my point. Because this is intrusion. Outsiders should not interfere, because you all are rotten. [Laughter]

Mr SpeakerEN

Okay. Minister, please.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

The question is convoluted. Only that Arau was once a Minister before, APMM was under Arau's jurisdiction before, and Arau also knows how enforcement exercises are carried out. Arau knows, in fact, but he is trying to ask questions to which he already knows the answers, Tan Sri. Only, I want to tell you that we indeed do not recognise it. Arau, we indeed do not recognise the Nine-Dash Line area that has been issued by China. Therefore, we will always use appropriate platforms to voice our rights, and in the ASEAN Chairmanship too, we will make this issue a focus for us next year. At the ASEAN level, for Arau's information, the ASEAN-China Joint Working Group, and we are co-host or co-chair of this committee, Tan Sri. Four meetings have already been held. The first in Bali, the second in Bangkok, Thailand, and the third in Xi'an, China, and now, today, from 27 November to 29 November, this meeting is ongoing in Vientiane, Laos.

Honourable Member, can you not ask the ship to leave within this one year? Tell it to leave in a year, that's enough.

Datuk Mohamad bin AlaminUMNO · BNKimanis

Sabarlah, Arau.

Mr Speaker

Arau, Arau.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Be patient, Arau, I want to answer this.

Mr SpeakerEN

Let the Minister answer first.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

They are in meeting. So, this committee has met four times, and today's meeting is in Vientiane, Laos, to finalise the Code of Conduct in the South China Sea, which must also be respected by all Asian countries, including China, which has also signed the Declaration on the Conduct in the South China Sea in 2002. Now we are in the process of finalising the COC, Arau, okay. So, for this enforcement, all agencies are indeed committed and always work in an integrated manner, Arau. APMM also went out to the field. TLDM also went out to the field. So, they have enforced it. We do not need to publicise what type of

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

enforcement we carry out. Arau said, chase them away and so on. That is part of the enforcement process. Should Malaysia publicise what we do? No need. So, what it means is, Arau, the enforcement exercise is always running today. So Arau, I think he already knows the answer. I think my answer is clear enough. Thank you, Tan Sri.

Mr SpeakerEN

Okay. Minister, enough. He has heard it.

Only this big APMM ship. [Makes hand gesture] Our navy ships want to go there.

Mr Speaker

Arau.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Enough of that, enough. The answer is clear.

Mr SpeakerEN

Okay, I invite Pasir Gudang.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you Tan Sri Speaker. Honourable Deputy Minister, my supplementary question. Does the five-nation defence arrangement still exist, consisting of Malaysia, the United Kingdom, Australia, New Zealand and Singapore, to assist Malaysia if there is an armed dispute with China in the South China Sea? Thank you.

Mr Speaker

Sila, Menteri.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Our relations with all countries are clear, that we practise an independent and also pragmatic foreign policy so that we can bring engagement and cooperation in all fields, the defence field and so on. Also, cooperation for us to hold joint exercises, Honourable Pasir Gudang, which we indeed always carry out with all the countries mentioned just now. In order to resolve the issues relating to this South China Sea, we use the ASEAN mechanism. This ASEAN framework is what we use today on how to find a solution so that we can finalise the COC, finalise any claims made by any Asian country, including China. We practise a policy of resolving problems or disputes peacefully. Not using provocative means that would escalate tension. This we avoid entirely. What is important is cooperation with all countries, Pasir Gudang, which we always strengthen, including exercises on how to enhance defence cooperation of that kind. But for that, [Inaudible] We have airport trade...

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Honourable Minister, if our ship is attacked, if Petronas' offshore rig is attacked, do we just keep quiet?

Mr SpeakerEN

Pasir Gudang, Pasir Gudang...

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

For this enforcement, our terms, my answer just now was clear, Pasir Gudang, that we always protect our sovereignty and also the interests of our economic activities in the areas being explored and also exploited. Indeed

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

our enforcement officers constantly monitor and carry out patrols periodically and continuously in the areas where we are carrying out exploration and also exploitation. PETRONAS, at Kasawari and many other places. Thank you, Tan Sri.

Mr SpeakerEN

Okay, I invite Tuan Wong Chen, Subang.

Tuan Wong ChenPKR · PHSubangEN

Thank you, Tan Sri Speaker. My question number seven.

Wong ChenPKR · PHSubang · questionEN

7. Tuan Wong Chen [Subang] asks the Minister of Women, Family and Community Development to state whether the Social Work Profession Bill will be tabled by the end of 2024, given that on 19 March 2024 he stated that the bill was scheduled to be passed in October 2024.

Dato’ Sri Hajah Nancy binti ShukriPBB · GPSMinister of Women, Family and Society Development · SantubongEN

Thank you, Mr Speaker. Thank you, Honourable Member. Mr Speaker, the Ministry of Women, Family and Community Development (KPWKM) indeed has the determination to make social work services a field with trained professionals, focusing attention on assisting vulnerable individuals and communities, with permission, in overcoming the challenges they face in daily life. In this regard, KPWKM is actively carrying out efforts to draft the Social Work Profession Bill (RUU Profesion Kerja Sosial), which among other things will contain definitions of social work and social workers, explanations relating to the scope of social work practice, as well as provisions relating to the establishment of a body responsible for recognising, registering and regulating social work practice. This will enable the practice and professional workers in this field to be governed by their own code of ethics in carrying out social work processes in Malaysia. The findings from various continuous engagement sessions, particularly between government agencies on the draft Bill, still require some specific scrutiny, including involving the determination of policy to ensure readiness for the implementation of the Social Work Profession Bill once it is passed. Thank you.

Mr Speaker

Baik, Subang.

Tuan Wong ChenPKR · PHSubangEN

Thank you, Tan Sri Speaker, thank you, Minister. Yes, lah, my earlier question has still not been answered regarding the timing. If possible, Minister, please answer the original one. This bill, Tan Sri Speaker, has taken 14 years. At that time, other ASEAN countries that are less developed, like Thailand and the Philippines, had already passed their bills. I wonder, what is really holding this up? The financial implication is small. Not even RM5 million. Is this being opposed by civil servants? If it is true that civil servants do not like this Act, we can, with permission, carve out, carve it out, because we as lawyers, we use the Bar Council. Government lawyers can

Tuan Wong ChenPKR · PHSubangEN

use legal services. So, there is no need to overlap. I think we really need it because this GISBH case could be avoided if we already had this standard. Okay, thank you.

Mr Speaker

Baik, Menteri.

Thank you, Tan Sri, thank you, Honourable Member. I greatly appreciate it. The Honourable Member always asks me. We often discuss informally. However, we also have its rules, among the rules regarding employment. There are several matters that need to be examined more deeply, especially in ensuring the sustainability, with permission, actually, of existing social work services in our country is not affected. Among them, the challenges and questions that must be addressed include the sustainability of the council or body that will regulate professionals in this field. This takes into account the fact that the nature, with permission, the nature of social work is different from other professions that can generate high income through the services provided. For example, it was just mentioned that the legal profession, yes. Second, the continuity of delivering existing social work services in both the public and private sectors. Third, compliance with the implementation of existing government policy. There are several other issues we are facing. Insya-Allah, we will work towards the most suitable solution to realise the aspiration of drafting this Social Work Profession Bill. Indeed, I myself want to see this so that it becomes a reality, and it is certainly not my preference to see this delayed, with permission. But, insya-Allah, we are always discussing. We will make sure this is expedited, Honourable Member. I also do not like it. Thank you, Honourable Member.

Mr SpeakerEN

Okay, I invite Kapar.

Dr. Hajah Halimah AliPAS · PNKaparEN

Thank you, Mr Speaker. Based on the MAMPU study, this is 2019, yes. This is the answer from the ministry itself. The ratio of Department of Social Welfare (JKM) social workers to the population of Malaysia is one worker to 8,576 people. That was 2019. I want to know now, how much is it? What's the ratio? Since the Social Work Profession Bill still cannot be tabled by the end of 2024, what interim measures does the government plan to strengthen the role and protection of these social workers in addressing critical issues such as poverty, domestic violence, child care, OKU and other vulnerable groups? What existing policies or initiatives will be strengthened? How will the government ensure the welfare of social workers is protected in situations that are often risky? Because I previously had some experience in an Australian hospital, for social workers, social workers are... It's part and parcel over the system. So, we still seem not to have got there yet.

Mr SpeakerEN

Kapar, please proceed with your question, okay.

Dr. Hajah Halimah AliPAS · PNKaparEN

Thank you. Already given.

Mr Speaker

Baik.

Thank you, Tan Sri Speaker. Thank you, Honourable Kapar. I must make sure we understand here the difference between social work and charity work. This is because many in Malaysia talk about themselves as social workers, but when we ask them, they are in fact volunteers in terms of volunteerism. So, looking at what is happening now, although there is not yet a specific act on the social work profession, the Department of Social Welfare (JKM) has developed the Social Work Case Management System manual as a guide and reference for its staff in carrying out social work processes. This case management system was developed to improve the Social Work Case Management System at JKM so that target groups receive services that are planned, competent and achieve their objectives. It was created to raise social workers' awareness of the knowledge, methods and skills required to practise case management competently. Therefore, the application of this case management system is recommended when the referred case requires further action to determine the problem situation. Careful planning and intervention are needed to help clients resolve or manage their problems, and they require periodic monitoring to identify the client's development or progress. This case management system serves as a guide in managing cases that require case intervention in all JKM service settings, especially at the district and institutional levels. This guide is used together with other JKM official documents that describe work processes, such as acts, regulations, rules and standard operating procedures (SOP). This system is flexible, and JKM social workers may adapt cases to suitable activities at each stage. Every work process in this system can be used according to the needs and circumstances of the client.

We will give the statistics in terms of the ratio mentioned just now in writing, yes. Thank you, Honourable Member.

Mr SpeakerEN

Good. Next, I invite Datuk Ahmad Amzad bin Mohamed, Kuala Terengganu.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Mr Speaker, my question is number eight.

Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala Terengganu · questionEN

8. Datuk Ahmad Amzad bin Mohamed @ Hashim [Kuala Terengganu] asks the Minister of Science, Technology and Innovation (MOSTI) to state whether the ministry will use a public-private partnership model for the National Remote Sensing Satellite Development (PSPJN) project without a special allocation in the national budget, given that so far it has only been decided as a public-private partnership initiative at the level of the Malaysian Space Agency (MYSA).

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

Thank you, Tan Sri Speaker, thank you, Kuala Terengganu. For the information of the Honourable Member for Kuala Terengganu, the Ministry of Science, Technology and Innovation (MOSTI), through the Malaysian Space Agency (MYSA), plays an important role in leading and implementing the National Space Policy 2030, which aims to strengthen the ecosystem of the country's space sector. On 14 August 2019, the Cabinet approved the PSPJN development programme, which will be implemented through a public private partnership (PPP) method, with permission. This approach will open opportunities for the private sector to be involved in satellite development and ensure the involvement of local industry, particularly in human resource expertise and the use of local space technology facilities. This PPP model enables Malaysia to harness the expertise and innovation of the private sector and to prioritise local content, with permission, in building local capacity in satellite technology. Apart from reducing government expenditure while mitigating technological risks, this PPP approach also opens new potential for local private companies to explore fields such as the construction, launch and provision of satellite services, thereby giving the government flexibility to explore more opportunities through private investment, which has the potential to advance innovation, commercialise satellite outputs and encourage wider participation in the country's space sector. Tan Sri Speaker, last year the government agreed to approve the policy direction of the PSPJN Programme with several improvements to ensure a higher success rate for the programme and to have a broader impact on economic growth and the country's capacity as a leader in space technology at the regional level. Although there is no special allocation in the National Budget, the government is committed to providing an optics value of not exceeding RM50 million a year for the purchase of satellite data to be used by government agencies once the satellite is successfully operational and supplying data. Taking into account the development and launch period of three years, the PSPJN satellite is expected to begin operations in the fourth year, with an expected start of operations no later than early 2028. Once the satellite begins operating, optics payments will be made periodically and based on the volume of data received and certified by the government. This approach enables the government to ensure that payments are reasonable and commensurate with the value of the data obtained, and encourages companies to maintain high quality standards in the delivery of satellite data. Thank you.

Mr SpeakerEN

Good, I invite Kuala Terengganu.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Thank you, Honourable Minister. It has been a long time for Malaysia to get a satellite of our own. The last one was in

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

2009, when we launched RazakSAT. When we launched it, after its launch its image drifted 37 kilometres and could not be used. Now we are waiting ten years, and even with approval in 2019 we expect 2028 before it can be used. So it needs to be accelerated to boost space technology. In this regard, I would like to ask about the current status of the development of the Space City, as it will also house the manufacturing industry for space-related components, the control centre, space launch operations and activities related to aerospace. So, what is the current status of this Space City? Besides that, I would like to ask about the government's efforts to ratify international outer space treaties. We have been talking about this for a long time. To protect national interests, when will it happen? Thank you.

Mr Speaker

Sila, Menteri.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you, Tan Sri Speaker. Thank you, Kuala Terengganu. For the information of the Honourable Member, the first RFP for PSPJN was opened in early 2022, although it was approved in 2019. Up to the RFP closing date in September 2022, there were four bidding companies that submitted proposals. Unfortunately, not one of them met all the mandatory technical requirements set. The Cabinet agreed to re-tender, which was opened on 31 January 2024 this year. That is why there was some delay. Regarding the development of the Space City (Space City), with permission, it is one of the main initiatives outlined in the National Space Policy Action Plan 2030. MOSTI, through MYSA, organised an engagement session on 23 November 2024 with stakeholders to align the Space City initiative with the existing frameworks and policies. The framework for the Space City initiative is expected to be completed in December this year. As for the question about international treaties: the Malaysian Space Board has agreed that our country will accede, with permission, to two UN space treaties, namely the Auto Space Treaty 1967 and the Registration Convention 1975, once the Malaysian Space Board Act 2022 [Act 834] is fully enforced in early January 2025. A Cabinet consideration paper will be tabled for consideration of the country's accession to the two treaties. Thank you.

Mr SpeakerEN

I invite Bentong.

Thank you. Honourable Minister, I listened to the Honourable Minister's answer just now. So my question is this: earlier, the first nano satellite was developed and launched by Universiti Teknologi Mara (UiTMSAT) in collaboration with Kyushu University, Japan. Recently, UiTM is developing its second nano satellite, which is one unit in size. The question is, how does MYSA play a role in ensuring the development of talent in building this satellite, especially together with local university research groups, and particularly in the field of space engineering?

Mr Speaker

Sila Menteri.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you, Tan Sri Speaker. Thank you, Bentong. In general, satellite development by universities is for educational and research purposes, as well as technology demonstration and science experiments in space. MYSA is planning a small-satellite development programme in collaboration with strategic partners from universities and local companies, which is expected to begin in the first quarter of 2025. MYSA also develops space engineering talent through five initiatives: (i) education and training programmes, namely providing education and training programmes such as workshops, courses and seminars specifically for the field of space engineering; (ii) collaboration with academia by providing R&D and learning opportunities for students; (iii) collaboration with industry through cooperation using the facilities available at the Space Technology Complex. Young talent in engineering can be nurtured; (iv) inspiration and motivation programmes for students and the young generation to choose space engineering as a field, such as science and technology events, competitions and visit programmes; (v) recognition and appreciation for talents who have shown outstanding performance in space engineering. Thank you.

Mr SpeakerEN

Good. Next, I invite Tuan Suhaizan bin Kaiat, Pulai.

Tuan Suhaizan bin KaiatAMANAH · PHPulaiEN

Thank you, Speaker, Pulai's question number nine.

Suhaizan bin KaiatAMANAH · PHPulai · questionEN

9. Tuan Suhaizan bin Kaiat [Pulai] asks the Minister of Foreign Affairs to state what was gained from the visits of YAB the Prime Minister to India and Russia, what is the development of Malaysia's membership in BRICS, and what is the effect on Malaysia's relations with G7 countries following Malaysia's application to BRICS.

Dato’ Seri Utama Haji Mohamad bin Haji HasanUMNO · BNMinister of Foreign Affairs · RembauEN

Thank you, Tan Sri Speaker. Thank you to Pulai. Tan Sri Speaker, BRICS is an acronym for the names of the countries that are members of that group of five. It was first established in 2009 with four countries. BRIC did not yet have an 'S'. B-Brazil, Russia, India and China in 2009. Then in 2010, South Africa, or Afrika Selatan, joined it. So we call it BRICS, with an 'S'. It is a membership of large countries, Dato' Seri, with large populations and many of the world's largest GDPs or economic growth.

Dato’ Seri Utama Haji Mohamad bin Haji HasanUMNO · BNMinister of Foreign Affairs · RembauEN

Its population is nearly over 40 per cent of the world's population. Its economic growth, its total economy, exceeds 25 per cent of the world's economy, Dato' Sri. So, it is a loose group of countries. It is not a group of countries based on the military. There is no military alliance, there is no pact of any kind, there are no treaties that member countries must sign. Therefore, Malaysia sees it as a new platform for us to broaden our presence on the international stage. BRICS is a very big platform. It is made up of big countries, and if our membership is accepted, Tan Sri, it would be a very great added value to our country. Earlier this year, BRICS allowed four new countries to join as new members, namely Iran, Egypt, the UAE and also Utopia earlier this year. They have been digested, and at the recent BRICS Summit in Kazan, Uzbekistan, Russia, which is the current chair of BRICS, has opened a new door for other countries. There are dozens of countries waiting to become members of BRICS, because it is a membership of progressive and dynamic groups of countries representing the global south, where countries now see that the geopolitical position is uncertain, and there is an effort to create a unipolar power, namely a world power that wants to dominate the world. That is why these countries are coming together to build new strength, a new platform, but it is more based on economics. Thus, Malaysia has been accepted because we applied to become a member of BRICS when we met the Prime Minister of China in China. For the first time, YAB the Prime Minister expressed our country's wish to join as a member of BRICS. Later, during the official visit, YAB the Prime Minister also told Prime Minister Modi of India that Malaysia had the same wish, and it received support. And finally, during the attendance at the Eastern Economic Forum (EEF) in Vladivostok, Russia, where the Prime Minister held bilateral talks between Malaysia and Russia, Malaysia again expressed its wish to be accepted as a member of BRICS. Alhamdulillah, although not officially announced, we have received a letter, Honourable Tan Sri Speaker, that Malaysia has been accepted as a country partner because membership is not yet open to new members. The basis for creating a new platform, namely the country partner, rather than a full member, is that BRICS members want to first digest the existence of the four new countries. They do not have an SOP on how to accept new members,

Dato’ Seri Utama Haji Mohamad bin Haji HasanUMNO · BNMinister of Foreign Affairs · RembauEN

they do not have one, Dato' Sri. That is why someone said it is a very loose club of countries. They are just loose. So, Alhamdulillah, I have sent a letter of thanks to my counterpart from Russia, stating that we are very pleased with the decision made during the BRICS Summit in Kazan recently. Thank you, Dato' Sri.

Mr SpeakerEN

Good. I invite Pulai.

Tuan Suhaizan bin KaiatAMANAH · PHPulaiEN

Thank you, and congratulations to the Minister on the answer just now. My question is about its effect on our relations with BRICS. At present, it is understood that several companies in our country that trade with BRICS countries, especially Russia, have been blocked, particularly semiconductor-based companies. Next year there will be new policies from the new president. Perhaps even harsher. So, what steps is the government taking to overcome this problem? Because our concern is that when they are blocked, our exports may decrease and affect our workers and so on. So, what steps is the government taking to face this situation? Thank you.

Mr SpeakerEN

Good. Please, Minister.

Tan Sri Speaker, regarding the supplementary question from my friend from Pulai. Indeed, we have received notice from the United States to impose sanctions on several companies in this country. This is based on their claim that these companies have exported 'dual sage' goods, that is, materials that can be used to strengthen Russian war equipment. As we all know, the whole world knows that the United States has imposed unilateral sanctions on Russia. These are not sanctions decided by the United Nations, but unilaterally imposed sanctions by the US. So, we do not accept these unilateral sanctions, Dato' Speaker. But nevertheless, being American is American, Dato' Speaker. They do it, and we do not want there to be consequences from this if we do not comply. America sometimes does crazy things, with permission, it may impose secondary sanctions on Malaysia, and then we would be worse off. So, these companies, of which three were recently identified, clearly are not manufacturers. They are trading companies, and the issue here is not the sanctions problem but whether we can take action, if at all, with permission, the government wants to take action against all three companies. They say under the Customs Act the declaration form was not correct. So, there was some error by those companies because they did not declare the goods and the country of origin correctly. Dato' Speaker, I would like to take this opportunity, Dato' Speaker, to remind our companies that even if their goods are sold to a destination in Dubai, as a manufacturing company we must know where our goods

ultimately end up. Because we do not want there to be stricter action from the United States, which would clearly impose secondary sanctions on our country, and then we would be in a very difficult situation at that time. Thank you.

Mr SpeakerEN

Good. I invite Padang Terap. Oh, it has already changed. Pasir Mas? Okay.

Thank you, Tan Sri Speaker. Good. On the matter of participation in BRICS, we know that we have not clearly informed Parliament, nor presented the agenda for our participation in BRICS. We in the opposition do not oppose the government's commitment. But I feel that several matters need to be thoroughly dissected first. We know that countries such as China, India and Russia are major economic powers and they have their own agendas. How will Malaysia position itself in BRICS while at the same time not wanting to be seen as anti to another bloc? And also, how will Malaysia bring our participation in BRICS to the ASEAN countries, because among the ASEAN group of countries we have our own economic platforms such as RCEP and also APEC. Thank you, Honourable Minister.

Mr Speaker

Sila Menteri.

As I mentioned earlier, Mr Speaker, we have not yet been fully accepted as members of BRICS. We are only country partners. If we are accepted, the Ministry of Foreign Affairs will naturally bring the matter to the Cabinet. But we are already bringing these BRICS partnerships to the Cabinet. If we are later accepted as a full member of BRICS, we will certainly bring it to Parliament for discussion, because joining BRICS is a major national decision. But, as I said earlier, Dato' Speaker, BRICS is not an alliance of any kind. It is a loose club. There is no treaty and no convention that we have to sign or comply with. It is a club for one purpose only: for us to speak up more as the global south, because the divide between the north and the south is clearly visible. We can see it, especially in our SDGs and in our climate change efforts.

Recently, at COP29, Dato' Chair. We should have received contributions from the developed countries that destroyed their environment 100 years ago. Their contribution should have been USD1 trillion, but they only gave 300 billion. This is something we deeply regret. Their promises at the Paris Agreement, and when we held COP in Glasgow (COP2008), all said they would contribute. This is the cost for us to manage this climate change, Tan Sri Speaker. It is very serious, very expensive, and requires high technology.

So, in BRICS, we have not diluted our role in the OIC. We have not reduced our role in the NAM. We have not reduced our role in APEC, and recently we were invited as a country to attend APEC and also G20 as a guest of the Brazilian Government. We have raised the same point, namely that the gap between the developed countries and the global south is very significant. The role of the developed countries should be to help, not to point fingers. They should work together to manage climate change, or what is termed global warming, Tan Sri. So, to answer the Pulai Member, we have not lessened our role. It will expand even further, especially in the economic field. We will open up our markets, because we also need to do what is called, with your permission Dato' Sri, a derisk policy. We should not depend on traditional markets; we depend on them far too much. If anything happens to those markets, we will fall flat. Therefore, we need to widen and diversify our markets so that if anything happens, given the uncertain geopolitical situation today and a world in disarray, we will not be left stranded. We cannot continue with a system where a few allies buy our goods. We need to increase and spread out our market for our goods, Dato' Sri. Thank you.

Mr SpeakerEN

Alright. Thank you, Minister. Honourable Member, the Question Time for oral answers has now ended for today. [Question Time for Oral Answers ended]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

Tan Sri Speaker, "Under Standing Order 12(1), I move that today's sitting shall not be adjourned until the debate and decision at the Committee Stage for the Ministry of Youth and Sports (KBS), the Ministry of Transport and the Ministry of Communications on the Supply Bill 2025 and the Development Expenditure Estimates 2025 have been completed, and that after that the House shall be adjourned until 10 a.m. on Thursday, 28 November 2024." Thank you.

Mr SpeakerEN

Alright. Is there a seconder?

Datuk Ts. Mustapha SakmudPKR · PHDeputy Minister of Higher Education · SepanggarEN

I second it. I also take this opportunity to welcome the presence of

Datuk Ts. Mustapha SakmudPKR · PHDeputy Minister of Higher Education · SepanggarEN

the State Leadership Council of the People's Justice Party (PKR) Sabah at the Parliament sitting this morning. [Applause] Thank you.

Mr Speaker

Baik.

[Motion put and agreed to]

Bill — Supply Bill 2025 and Development Estimates Motion 2025 CommitteeBill

The Order Paper was read to resume consideration of the "Supply Bill 2025 and Development Estimates 2025 in the Committee of the Whole House." [Ninth Day] [House in Committee] [Mr Speaker chaired the Committee]

Good morning, Tan Sri Speaker. Jelutong.

Mr Chairman

Ya.

Point of order.

Mr ChairmanEN

Which standing order is that?

Standing Orders 36(6) and 36(12).

Mr ChairmanEN

Okay. What is the point?

It concerns my motion to refer the Honourable Member for Pendang to the Committee on Rights and Privileges. I have also received feedback from Tan Sri Speaker himself, attaching a letter of explanation from the Honourable Member for Pendang and...

Mr Chairman

Baik.

...where he wishes to...

Mr ChairmanEN

I have already given a date...

Mr ChairmanEN

...to resolve that issue. I will inform the Honourable Member later.

Yes. Tan Sri Speaker. For your information too, I have replied to that letter. The letter from the Honourable Member for Pendang admitted that he had made an error and wished to correct the statement. I have replied to that letter, giving an answer to Tan Sri

Speaker. I also request a ruling that he be referred to the Committee on Rights and Privileges. Thank you.

Mr ChairmanEN

Alright. I have received that letter and I will reply to it.

Thank you, Tan Sri. Thank you.

Mr Chairman

Baik.

Bill — Supply Bill 2025 and Development Estimates Motion 2025 Committee — Head B. 45 [Schedule] – Head P. 45 [Development Estimates 2025] –Bill

Mr ChairmanEN

Alright, Honourable Members. Supply Head B.45 and Development Head P.45 under the Ministry of Youth and Sports (KBS) are open for debate. I have received a rather long list from Honourable Members. I will read out all these names. Alright. Starting with YB Kudat. Then Alor Setar, Bangi, Gerik, Kuala Pilah, Permatang Pauh, Miri, Kangar, Batang Sadong, Kepala Batas, Sungai Petani, Jeli, Kampar, Sungai Besar, and finally Sipitang. Each Honourable Member is given 15, sorry, five minutes per debater, and I will start with Kudat. Please proceed.

Thank you, Tan Sri Speaker. Assalamualaikum warahmatullahi wabarakatuh and greetings of unity. Malaysia MADANI greetings. Kudat wishes to raise several matters in the Committee on Youth and Sports. P.45 Item 00100 – National Youth Skills Institute (IKBN). In Sabah, we have only one IKBN, located in Kinarut, which offers civil technology and electrical technology. Kudat requests that KBS consider building another IKBN in Sabah, located in the north of Sabah, namely in the Kudat Parliamentary constituency. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] Next, Item 00601 – Upgrading of State Youth and Sports Complexes. Upgrading of the Kudat Sports Complex. I had applied to the Honourable Minister this year for an allocation to upgrade the floodlights at the Kudat Sports Complex, but it was not approved on the grounds that there was no allocation and because of an issue over land ownership, as the project site is not owned by KBS Malaysia. This land ownership issue is a problem because, in my view, all sites for sports or sports complexes belong to the state government. If this is used as a reason not to help with needs, especially in these rural areas, then we will not be able to

provide the best services to the community or the people in rural areas. Madam Chair, next, Item 02007 – Community Sports Complex. Kudat requests that community sports complexes be built in Pulau Banggi and in Pitas District respectively. This is because these rural areas have great potential to become hubs producing sports talent or the best athletes, given that young people in rural areas are still involved in outdoor activities every day. For example, in Banggi, we have produced several national-level players, one of whom is Muhd Asri bin Muhairi, the country's number one volleyball player. Kudat is confident that if the Honourable Minister and also the Honourable Deputy Minister could provide community sports complexes in Banggi and Pitas, the Minister and Deputy Minister will certainly become the favourites of the young people in my area. Next, Item 02400 – Sports Courts. Kudat would like to ask how much allocation from the ministry has been spent for the Kudat Parliamentary constituency from 2023 until now? As far as I know, there has not been a single sports court project at village level in the Kudat Parliamentary constituency under the MADANI Government administration, even though this need is very important for encouraging youth to take part in sports and preventing them from unhealthy activities.

Next, 06000 – Community Sports Development, together with 07000 – Building and Facilities Maintenance. Kudat welcomes this initiative. However, Kudat feels that the delivery system needs to be improved, because I have been informed by officers from KBS Malaysia that the land problem, namely that the land does not belong to the Ministry of Youth and Sports Malaysia, has prevented allocations from being channelled to maintain futsal courts and all sports courts in rural areas, especially in the Kudat Parliamentary constituency, which has 12 futsal court facilities, namely in Kampung Rosob, Kampung Senaja, Kampung Telaga, Kampung Adibungan, Kampung Pekan Baru, Kampung Feri in Pitas, Kampung Lok Tohog, Kampung Batu Layar in Banggi, and in Kudat, Kampung Andap Bangau, Kampung Tajau, Kampung Landung Ayang, and at the Kudat secretariat. So, I request that the Ministry of Youth and Sports give my constituency the opportunity to obtain these allocations to maintain these needs or the sports courts that are required. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Kudat. I invite the Honourable Member for Alor Setar.

Thank you, Honourable Chair, and the Honourable Minister who is also present in the House. There are four matters I would like to touch on in my debate this time. First, regarding 010200 – Malaysia Stadium Corporation. I was informed by the Honourable Minister himself earlier in the House that the National Hockey Stadium would be selected as a venue for concerts. He said there are already 26 concerts to be held at the National Hockey Stadium in Bukit Jalil in 2025. Still on the issue I raised earlier with the Honourable Minister, this stadium will carry a risk of damage. Previously it was done at the football stadium, and then at the hockey stadium. I congratulate you for having another alternative, but it is still exposed to damage, even though the turf is different. The hockey stadium may be more durable than the football stadium, but it is still exposed to damage, and as for the concerts themselves – I am not opposing these concerts. Everyone sings. The Honourable Member for Sabak Bernam is also good at singing. However, the ratio between concerts and other activities that are not concerts, I feel, needs to be balanced, because young people need exposure to understanding and knowledge rather than entertainment. Entertainment is there, but the ratio is quite small. The ratio must not be too high to the point where it causes them to become complacent, lazy and to have other social problems. I would like to give the example of the Sepang International Circuit. Although I have been informed for seven years that it no longer hosts F1 events, the Sepang Circuit is still on the MotoGP calendar. It is still active with various motorsport activities and many non-motorsport events. It generates income. However, it has a racing track, whereas a hockey stadium is different. But that is the dilemma I feel KBS faces. I understand, but it is something we must consider, because the stadium was built for sports, unless the stadium was originally built as a multi-programme, multi-activity venue. I think KBS can consider that more in the future. Second, Honourable Chair, regarding 010300 – Malaysian Youth Development Research Institute. I am informed that it acts as the National Youth Development Research Centre. Looking at our budget, there is an increase compared with last year, 2024. This year RM2.6 million, last year RM2.25 million. I would like to ask what results have come from the studies conducted by this institute? I suggest that this institute also be used for a study and programme on raising awareness of youth development in politics, so that youth involvement in politics is non-partisan. They become more exposed, and we use this platform to give political education to young people, alongside other ministries. I think KBS needs to focus on this. Ideally, the political education programmes to be organised should be impartial or natural in nature. If political parties are to be involved, I agree that all should be involved, and the youth can choose. So, we

engage in mature dialogue on the platform provided by KBS through this Malaysian Youth Development Research Institute. Third, Honourable Chair, regarding Youth and Sports – 020100. This is about the issue of badminton. We know that BAM bears a major responsibility for developing this sport, but the main issue raised in the Malaysian badminton world is that we lack consistent young talent. After Datuk Lee Chong Wei retired, the performance gap between him and the young successors is very significant. So, there is a gap there. I understand there is the Badminton Academy of Malaysia, but we see results that still cannot rival Indonesia and Thailand, whose badminton athletes appear to be of higher calibre than ours. It seems there is a gap. Moreover, Honourable Chair, we are heading towards the LA 2028 Olympics. I think we should already start the Road to Gold (RTG) programme for the LA 2028 Olympics, so that we can erase or重 match our previous records in Olympic sports, where we did not achieve our targets well. Finally, Honourable Chair, regarding youth mental health, 030400. This is also a matter of concern, Honourable Chair. According to the National Health and Morbidity Survey 2022, depression among adolescents rose to 26.9 per cent, compared with 18 per cent three or four years earlier. This means teenagers today are increasingly exposed to depression. Previously these teenagers, these children, Chair, played a lot, but today these teenagers are depressed. Even more serious, Honourable Chair, 13 per cent of teenagers reportedly have thoughts of suicide. This is very dangerous. I think we must take serious action. Whether it is over there or here, we must take this seriously. So I suggest..

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila gulung.

KBS should draw up a detailed strategic plan with a long-term horizon, even though we already have the Youth Mental Health Index, which is more about data collection, Honourable Chair. It does not contain any action. Perhaps it could collaborate with other ministries or any experts. This matter needs our attention because today's teenagers are easily influenced by social media. They look at other people's lifestyles and compare themselves, and feel they fall short. All of this leads to depression. I think these are matters we need to pay attention to, because if our mental state is not well, how can our body be well? So KBS, I suggest focusing on those two things. Apart from focusing on the physical aspects of sports athletes, mental health has also become a serious issue that needs attention. Thank you, Honourable Chair. Thank you, Honourable Minister.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Alor Setar. I invite the Honourable Member for Bangi.

Thank you, Madam Chair. Assalamualaikum warahmatullahi wabarakatuh. Malaysia MADANI greetings. I now move on to code 031300, which is Rakan Muda. This year I see that an allocation of RM22 million has been set aside for the Rakan Muda programme, and I welcome this allocation. I was present, Madam Chair, at the launch of the new breath of Rakan Muda in 2023 at UKM, in my Parliamentary constituency. For those of my generation, and certainly the generation of the Honourable Minister of KBS and also the Honourable Minister of KESUMA who is here, Rakan Muda was an iconic programme in the 1990s. So now this Rakan Muda programme has gone through a process of rejuvenation with an allocation that I think is very large and sufficient at this time. I would like to know, Madam Chair, how many Rakan Muda programmes have been implemented so far, particularly in the Bangi Parliamentary constituency? What are the plans for Rakan Muda programmes in the Bangi Parliamentary constituency in the future? I ask this question because, as far as I know, though I may be wrong, one programme that was implemented under the Rakan Muda banner in the Bangi Parliamentary constituency was the big-screen screening of Ejen Ali, which was held or screened a few weeks ago, and this programme was very successful. I congratulate the Hulu Langat Youth and Sports Office. But at the same time, I hope more Rakan Muda programmes can be implemented in the Bangi Parliamentary constituency, because Bangi has many higher learning institutions, Madam Chair.

For example, UKM, UniKL MFI, GMI, New Era College University and also UTAR. If we look at the data from the Department of Statistics Malaysia (DOSM), Madam Chairman, 21 per cent of the population in the Bangi Parliamentary constituency falls within the young age category. Therefore, Bangi is very suitable to be made a venue for holding more Rakan Muda programmes. I would also like to propose that the Ministry of Youth and Sports (KBS) consider appointing ambassadors for this Rakan Muda programme, just as has been implemented in Selangor, namely the Selangor Youth Mobilisers (PBS), where every zone of the Councillors has a youth mobiliser. We do not need to do this for every zone, but perhaps in every Parliament, we could have Rakan Muda ambassadors to implement Rakan Muda programmes in the area. I now move on to Item 031000 - Impact Integrated. Here I see there is an increase for 2025, namely RM8 million next year compared with RM7 million this year. I welcome this increase in funding. I would like to touch specifically on one initiative under this Impact Integrated, namely Esports Integrated (ESI). As we know, ESI is aimed at driving the development of e-sports in Malaysia. Indeed, we know that e-sports has tremendous potential in Malaysia. I have said in this House many times that I am a gamer, but I am not an e-sports athlete, not a competitive one. But we know that in Malaysia there is indeed great potential in e-sports. E-sports athletes and e-sports teams are now making a name for themselves

in international championships. Moreover, at the Asian Games last year, e-sports contributed two medals to Malaysia, namely a silver and also a bronze. Therefore, we must view e-sports as a sport that can contribute to the medal haul for the country, especially if e-sports is included and recognised in international sports competitions such as the Asian Games. So, it is only right that e-sports athletes be given recognition and support, just like other athletes. At the same time, Madam Chairman, I think we should also nurture e-sports at the community and grassroots level. I see – sorry for saying so – that e-sports at the grassroots level is still somewhat chaotic and, with respect, disjointed. Here I hope the ESI can play a bigger role. Not only by organising competitions or providing facilities or sports hubs, but also by being directly involved or at least monitoring e-sports at the community and grassroots level. Let me give an example. I think many representatives from here or over there have organised e-sports competitions, PUBG, Mobile Legends and so on. But I see that, yes, young people come and join, but who is looking at the potential of those who enter these community and grassroots competitions? Because we do not want them to enter, to have potential but for their talent not to be scouted. I know there is scouting by commercial e-sports teams and so on. But they are not comprehensive. So, if the ESI can play this role, I think it can nurture talent and also scout the talent of e-sports athletes at the grassroots level. There needs to be coordination with the ESI for competitions and championships at the grassroots level. Because I believe, Madam Chairman, if we nurture the talent of these local e-sports athletes, we will be able to produce more world-class e-sports athletes. With that, I end my speech. Thank you. Bangi respectfully supports, Madam Chairman.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, Honourable Bangi. I invite the Honourable Gerik.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Assalamualaikum warahmatullahi taala wabarakatuh and greetings of peace. Thank you, Honourable Chairman, for the opportunity given. Gerik would like to touch on the Budget of the Ministry of Youth and Sports for the purposes of Supply 45, Item 030000 - Special Programmes. There are two that are interesting, Mr Chairman. Firstly, regarding Item 030300 - National Sports Day, with last year's budget estimated at RM2.7 million and this year increased to RM3 million. Then, there is another programme, Item 03100 - National Youth Day, with a budget of RM5 million. Such programmes are actually very good for the development of our youth across the country. However, Gerik wishes to draw the Minister's attention to one

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

issue that we may have overlooked, namely that many of our graduates in sports science courses are unemployed because they cannot find jobs that match the education they have, especially many who work as Grab drivers, various jobs that are not in the sports field. So, Gerik sees that with the organisation of such large-scale programmes, these sports science students should be given the opportunity to work or be involved in all KBS activities. KBS should call them in, reorganise them, so that they may perhaps be placed in companies related to sports or companies under KBS itself, right. So, they will gain an experience and perhaps they can also run businesses related to sports. It is quite a loss if we let talents like these, who have education up to a degree, and some even have Masters, some have PhDs in sports, end up working in fields that have nothing to do with sports. For example, the closest one might be that KBS could also discuss with the Ministry of Education to appoint these sports science students as trainee teachers for school sports programmes. Currently, what we practise is perhaps that teachers themselves train the football team or whatever sports teams there are in the school. But if we can, we can plan a new mechanism, perhaps teachers no longer need to teach sports but be replaced by sports science students who are scattered across the country. So, that is a suggestion from Gerik. Perhaps we can also create new programmes or new leagues in districts across the country and also place these sports students there. Apart from wanting to develop our youth and avoid all kinds of social problems, drugs and so on. Secondly, Madam Chairman, regarding another matter, Development 45, Item 02001 - Rakan Muda District Complex (KRMD). On the issue of Rakan Muda Complexes, we now have 34 Rakan Muda Complexes across the country. So, does the ministry have plans to add more? Because for places like Gerik, which is far out in the rural areas, we really need a complex like this. So, we can gather our wide district and call the people in these remote areas, yes, all these youths. We can gather them to carry out activities there. The same goes for Item 02007 - Community Sports Complex. This Community Sports Complex is the same. So, Gerik takes this opportunity to ask, if the ministry could reconsider building a district Rakan Muda complex and also a district sports complex or community sports complex in the Gerik district, in the Gerik Parliamentary constituency. Lastly, regarding another matter, I want to draw the Minister's attention to the issue of sports donations or tax exemption from LHDN for sports donations. This issue has been long-standing among sports activists or sports associations. We do not have a clear mechanism

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

on how exactly sports associations can directly apply for sports funding donations that have Inland Revenue Board of Malaysia (LHDN) tax exemption. Many of our corporate companies actually want to help. We have our sports associations. But our method, we do not have a clear method, one that actually allows direct access. When they give donations to associations, the association can issue a letter stating that they can reduce tax when they make their accounts at year-end. Because currently, most of us have to go through the National Sports Council (MSN), for example, or through the State Sports Council. So, our sports associations are many. Sometimes our donors, community-level donors in districts and so on, do not go as far as dealing with the state level.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

So, this kind of thing hinders and impacts sports donations to rural areas. For the big clubs, like football, football for example, state associations and so on, there is no problem. But we see that if KBS can find a good mechanism, discuss with the Ministry of Finance, perhaps the situation will change, and the development of sports associations in rural areas will change. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Gerik. I invite the Honourable Kuala Pilah.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

In the name of Allah, the Most Gracious, the Most Merciful, Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Honourable Chairman, Madam Chairman, Kuala Pilah would like to refer directly to Item 02001 — Rakan Muda District Complex (KRMD). Kuala Pilah would like to take this opportunity to express immense and endless thanks to the Honourable Minister of Youth and Sports, because in the Minister of Youth's answer given at that time by the Deputy Minister of Youth, an allocation of RM6 million was approved for the upgrading of the Kuala Pilah Rakan Muda Complex. Thank you, Honourable. However, recently I was informed that this allocation does not include the application that should be a priority, namely for building a roof or a roofed open hall, a roofed open hall. Therefore, Kuala Pilah is in great need of a roofed hall for organising sports activities as well as non-sports activities that are often disrupted, especially during the rainy season. It is understood that the ministry rejected this initial application because it involved a fairly high cost, therefore Kuala Pilah requests the ministry to reconsider, Honourable, the construction of an open hall with a roof, which involves a lower construction cost than an enclosed hall but can still fulfil the aims and purposes of the construction.

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

Honourable Madam Chairman, Kuala Pilah also hopes that this upgrading project can be combined with the construction of a synthetic field using artificial turf within this Rakan Muda Complex. Although a synthetic field will involve a fairly high installation cost, it is more economical in the long term, especially in terms of maintenance costs. Moreover, a synthetic field is not limited to football, but can also be used for other sports or non-sports activities. For information, the Kuala Pilah Rakan Muda Complex is also always crowded with members of the public for recreational purposes. Therefore, Kuala Pilah also requests the ministry to build a comfortable running track here to enable the public to engage in recreational and fitness activities, and at the same time encourage a culture of sports among the people, especially in Kuala Pilah. Honourable Madam Chairman, Kuala Pilah refers to Item 02007 — Community Sports Complex, Item 06000 — Community Sports Development. Kuala Pilah is also known through the organisation of the Ngoca Football Festival, namely the activity of playing football in a paddy field, which has become an annual event here. This festival promotes the traditional sports and culture of this state because it is not found in other states, thus becoming a trademark, with respect, Honourable, of Negeri Sembilan. The organisation of this festival has indirectly elevated Kuala Pilah as a destination for community sports, moreover with the very encouraging participation of those from outside the state. To ensure this event can be organised on a large scale and guarantee the comfort and safety of visitors, Kuala Pilah hopes that the ministry can provide an appropriate allocation to upgrade the facilities by building lighting and beautifying the landscape at the Ngoca Stadium Kuala Pilah. This is because it involves quite a large cost. Apart from that, Kuala Pilah also hopes that the ministry can draw up a plan to develop and further introduce the Ngoca sport. Kuala Pilah is confident that with effective promotion, this sport can attract more participation from within and outside the country and make the Ngoca Football Festival an internationally recognised sporting event, while boosting economic development and income opportunities for the local community. Finally, Honourable Madam Chairman, Kuala Pilah refers to Item 02400 – Sports Courts. Futsal courts are a sports facility that have been widely built for public use across the country, and I would like to express thanks and congratulations to the ministry for the attention given to the construction of these futsal courts. Kuala Pilah — the Kuala Pilah Parliamentary constituency also has as many as 29 futsal courts. However, all these courts require maintenance. Kuala Pilah sees an urgent need to carry out maintenance work

Dato’ Adnan bin Abu HassanUMNO · BNKuala PilahEN

for all these futsal courts to ensure these sports facilities are always in good condition and can be used for a long period. In addition, regular maintenance is also very important to safeguard the safety of users, and therefore, Kuala Pilah believes that with development or allocation for maintenance purposes, in the long term it will provide benefits not only to the Ministry of Youth and Sports but also to stakeholders, namely the people or youths in the areas of those Parliaments. Thank you, Honourable Chairman, Kuala Pilah hereby supports.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kuala Pilah. I invite the Honourable Permatang Pauh.

Assalamualaikum warahmatullahi wabarakatuh and good morning to all. Thank you, Madam Chairman. I would like to refer to Item 031200 — Sepang International Circuit Sdn. Bhd.. I agree with the agreement between Sepang or SIC and Petronas to collaborate for three years. This can reduce SIC's dependence on government budgets. Following this agreement, if we look, many lively programmes have been implemented at SIC. Among the youth, especially Pemuda PAS and Bersatu, recently we watched the Sepang MotoGP Competition 2024 in early November, especially for the youths who are interested in motorsport events. So in this honourable House, I would like to raise that apart from the good events that have been held, there are some matters that may be improved. What I want to share today relates to the tradition of showcasing sexy women models who are eye-catching throughout the event. If we look at it, it contradicts the teachings of Islam, firstly, and it also contradicts the fifth of our Rukun Negara, 'Kesopanan dan Kesusilaan'. It is very improper for motorsport, which is synonymous with men and is loved by various segments of society, to be presented with such a tradition. Many visitors have also complained about this matter. So, I request that if possible, KBS can take this view into account, as we did before. If we look at the F1 category previously, there was a champagne ceremony given on the podium, but in recent years before SIC was revived, we see that the champagne presentation was not given. This is a good thing that may be worth practising in our country, especially regarding the issue of these eye-catching women. Madam Chairman, Item 031300 — Rakan Muda Programme. In this budget, if we look, RM22 million is allocated for this programme. So, with this large allocation, I request the KBS to list in detail the programmes to be implemented, the programme targets, the programme objectives,

the modules and syllabus to be used, the total allocation distributed to the states, and the method of allocation. It is important for the Minister to explain in detail, because we are concerned that politically loaded programmes will be created to promote particular political ideologies, as alleged to have happened under the previous government. Apart from that, I hope that, if possible, the programmes being organised will be guided by what I have mentioned earlier, in line with religious guidance and in line with the principles of the Rukun Negara, especially on matters of aurat and the boundaries of social interaction, and also in relation to what the Honourable Alor Setar mentioned just now on the issue of mental health. If possible, let the modules being prepared take these matters into account. Finally, Madam Chairman, I wish to touch on Item 010200 – Malaysia Stadium Corporation (PSM). When answering a question from one of the Members of Parliament in this august House, the Honourable Minister stated that the National Hockey Stadium, as mentioned by the Honourable Alor Setar, has hosted nearly 26 concerts. So, apart from the issue of damage to the pitch and so on, I would like to ask whether the original function of this facility has begun to drift from its original purpose? Does this high frequency of concerts not disrupt the training routine and also the competition schedule to be held at the hockey stadium? I would like to remind everyone that we must not sacrifice the performance and reputation of the outstanding National Hockey Squad because of matters of this kind. The misuse of sports facilities for entertainment that has no connection with the objectives of sports development actually reflects the government's failure to assess which priorities should come first.

I call on the government to review this policy and to ensure that our stadiums return to their original purpose, giving priority to sports activities and athlete development. Finally, I am rather puzzled by the Madani Government today, because earlier the Minister of Women's Development stated that the number of unwed teenage pregnancies was nearly 20,000. Yet on the other side, we seem to be resigned to programmes that can contribute to free social interaction and excessive entertainment, which will certainly bring a thousand and one problems. So, I request that all of these be considered. Thank you, Mr Chairman.

Mr ChairmanEN

Thank you, the Honourable Permatang Pauh. I invite the Honourable Kangar.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Assalamualaikum warahmatullahi wabarakatuh. Good morning – good afternoon. Thank you, Mr Chairman, Honourable Members. Based on the 2025 Budget, the Ministry of Youth and Sports (KBS) has received RM1.12 billion, and among KBS's missions is to drive the holistic advancement of youth in sports to meet the nation's aspirations. So I will go to – first, at the district level. Item 02400 – Sports Venues, with RM135 million allocated. So, firstly, the Kangar Futsal Arena is an indoor activity centre, with permission, especially for young people, whether men or women. However, the futsal arena's surface has been found to be rather rough, causing the ball to be easily damaged. It is not just once – if you play a tournament in one day, the balls can be damaged two or three. So, I would like to ask KBS to address or replace the surface of the futsal arena. Secondly, the beach volleyball court in Kangar, opposite Hotel Putra Regency. This venue is often used by many agencies and sports clubs across the country, including MAKSWIP sports, statutory body sports and so on. This venue is the only beach volleyball court in the state of Perlis. An application for upgrading has already been submitted to KBS, to the Honourable Minister earlier. So, this time, hopefully, it will be for Kangar to obtain approval for this beach volleyball court. I now turn to Item 01800 – Preparation for International Sports, RM63.5 million. So, the public knows that Malaysia failed to win a gold medal at the Paris Olympics. So, what is the new direction and plan of KBS to overcome the failure to win a gold medal at the Paris Olympics ahead of the Los Angeles Olympics in 2028? Secondly, what is Malaysia's target at the 2026 Commonwealth Games? I turn to Item 030800 – MSN Sports Training and Development Programme, RM44 million. Where is the direction of the NFDP programme, which involves grassroots players across the country? So, based on my observation, the strength of Malaysia's grassroots or youth teams has begun to show signs of decline compared with neighbouring countries, Thailand and Indonesia. So, is there a need for drastic change at the level of Akademi Tunas (AT), Pusat Latihan Daerah (PLD) or Akademik Mokhtar Dahari (AMD) in terms of coaching and competition structure? Now, on the matter relating to the Liga Bola Sepak Malaysia, or Malaysia Football League, it is currently in a rather worrying situation, where several teams are facing severe financial problems. Unpaid salary arrears plague the teams. The cost of running a team is very high. The question of privatisation of teams from FA to FC appears difficult to realise. Many teams have to depend on state governments to continue competing. Meanwhile, sponsors are also worried about the gloomy state of the Malaysian league. So, my question is, where did it go wrong? Has the MFL failed to ensure that every team is truly strong and stable after privatisation? Has the implementation of financial

Tuan Zakri bin HassanBERSATU · PNKangarEN

fair play, with permission, for all teams failed to prevent teams from spending according to their means? What new approaches are being taken by the CEO of MFL, Pompili Rossi, to overcome this crisis, because in the end young players fail to get a place since teams fail to take part in competitions? This is actually for the CEO of MFL, but the Minister must answer too. Mr Chairman, Item 00906 – Sports Personnel Development Programme – Sports Personnel Scheme, with an allocation of RM50.9 million. My question is, what efforts has KBS made to strengthen YAKEB? How much has KBS allocated to YAKEB for 2025? That is all from me. Thank you.

Mr ChairmanEN

Thank you, the Honourable Kangar. Thank you for keeping to time even though the clock was not moving, yes. The Honourable Batang Sadong.

Puan Rodiyah binti SapieePBB · GPSBatang SadongEN

Thank you, Madam Chairman. I go straight to Item 02007 – Community Sports Complex, Item 02400 – Sports Venues. I would like to ask the ministry how much has been allocated for Sarawak to develop sports infrastructure under these items? Madam Chairman, I received a written reply from KBS during the debate on the 2025 Budget Policy on 7 November last. I was somewhat disappointed when KBS informed us that it had cancelled and had no intention of building the Batang Sadong Sports Complex, owing to the unresolved project site issue, and stated that there is sports facility construction by the state government on that site. In my view, this justification is not accurate at all. I would like to ask whether the ministry has issued any document or official letter regarding the cancellation of this complex project or this indoor sports hall, which in 2018? During discussions in May 2023, I was informed that this project was merely postponed until the allocation was re-applied for. So, the Ministry of Youth and Sports, Sarawak Entrepreneur Development, wrote to KBS to apply for the reallocation of this project in August 2024 for consideration. For the Minister's information, I once again state that this indoor sports hall will complement the existing sports facilities, namely a football field and a racing track, to form a complete sports complex. This project was approved under the Twelfth Malaysia Plan (RMKe-12) with an allocation of RM9.5 million, which the local community has long yearned for and which was publicised and announced to the local community earlier. If KBS continues to cancel this project, I feel it could damage the reputation of this Unity Government. Therefore, I call on the ministry to reconsider and channel back the funds that were previously allocated to realise this project.

Puan Rodiyah binti SapieePBB · GPSBatang SadongEN

Next, I represent Lubok Antu because I did not get a slot to debate, concerning Item 01800 – Preparation for International Sports. My question is, what plans does the ministry have to upgrade sports facilities in Sarawak, considering that Sarawak is the co-host for the 34th SEA Games in 2027? Next, Item 06000 – Community Sports Development. Under this item, I request that KBS state the details of this allocation and how much has been channelled to Sarawak? What and how much allocation will be received, especially for sports development in rural areas?

Puan Rodiyah binti SapieePBB · GPSBatang SadongEN

If there is, how can I or any other Honourable Member apply? I hope the ministry can ensure a fairer and more equitable allocation by giving priority to areas that are still lagging in basic sports facilities, not concentrated only in urban areas. Next, fourthly, I would like to refer to Item 020000, Item 020200, Madam Chairman, for the Youth Development Programme. I request that the ministry state in detail the programmes and amounts that are being and will be carried out in all states, and still under the same item, we know that many of our national veteran athletes once brought honour and a good image to the country in the past. Now, perhaps they have aged, retired or are frail. Their contribution to the nation's sports cannot be forgotten. My question is, what are the latest initiatives introduced by the government to guarantee the future of athletes who once brought honour to the country but are no longer active in the sports arena? Finally, Madam Chairman, for the purpose of Development 04007, namely the Youth Development Study amounting to RM1.6 million. I would like to ask, what form of study will be focused on in this youth development study and for whom will this study be conducted to ensure youth development is achieved, and will you share the outcomes of such studies if they have ever been carried out? So, that is all from me. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Batang Sadong. I invite the Honourable Kepala Batas.

Dr. Siti Mastura binti MuhammadPAS · PNKepala BatasEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Madam Chairman. Firstly, Item 020400 – National Sports Institute. During the last oral question session, the Deputy Minister mentioned that all programmes under the ministry are offered free treatment to the athletes involved. At that time,

Dr. Siti Mastura binti MuhammadPAS · PNKepala BatasEN

the Honourable Kepala Batas raised the issue of injuries involving players under the National Football Development Programme (NFDP) established across the country. Therefore, as is commonly known, the sports treatment and rehabilitation facilities at the Bukit Jalil Complex are among the best in this country. The Honourable Kepala Batas would like to know whether the cost of transport and accommodation during treatment will also be borne by the ministry should treatment and rehabilitation need to be carried out at the Bukit Jalil facility. The treatment and rehabilitation process for players who have suffered ACL injuries must be carried out with dedication. The goal of treatment for athletes or players is not merely to be able to run and kick the ball again, but to be able to return to performing as well as possible, as before the injury. They are the jewels of the nation's future. Therefore, the best treatment and rehabilitation process should be provided. Secondly, 020100 – Youth and Sports and 030300 – National Sports Day. The Honourable Kepala Batas congratulates the Pertubuhan Seni Silat Pusaka Gayong Malaysia, which has just organised the Datuk Zuraidi Rahim Cup, the National Open Silat Championship and International Invitation, recently in Alor Setar. Silat is a Malay heritage that is increasingly gaining a place in the hearts of Malaysians, especially young people, in recent times. The desire to know and learn the art of silat has begun to cross races and communities regardless of age limits. This growing interest has become increasingly evident after the screening of the Malay legendary film Mat Kilau, and the film Syahadan, led by Jufferi Jamari, who is a four-time gold medallist at the World Silat Championships. Therefore, the Honourable Kepala Batas would like to know, is there any consideration by the ministry to include silat as part of the Rakan Muda Programme in the future? Silat is not merely a dance of movements and a martial art, but it is also a way of life of the Malays since long ago and, until now, there are still practitioners. This sport has also brought much honour to the country in local and international championships. Moreover, there are not only Malays among the silat practitioners, but also bumiputera from Sabah, such as Merrywati Manuil. The Honourable Kepala Batas would like to know, what is the status of this silat event in the Podium Programme and how has preparation been planned for this sport ahead of the 2027 SEA Games? Hopefully, we will bring home gold through this silat event. The Honourable Kepala Batas would like to propose that pencak silat championships be increased and promoted as an annual or biennial event. More competitions organised means more potential young silat talent can be discovered and polished, such as the One Silat Competition, with permission, organised by Rumpun Silat Sarawak. Given that the number of silat enthusiasts and practitioners is growing at this time, the Honourable Kepala Batas would like to know whether the ministry has any plans to encourage more silat events for the National Sports Day celebration in 2025.

Dr. Siti Mastura binti MuhammadPAS · PNKepala BatasEN

The Ministry of Youth and Sports has plans to target Malaysia as a Sports Nation by 2025, as reported by the Harian Metro portal on 20 September 2022. How will this plan be continued to achieve the target, and what is the current Malaysian Sports Culture Index score? Next, 031300 – Rakan Muda Programme and 02001 – District Rakan Muda Complex. Congratulations to the Ministry of Youth and Sports for its efforts to revive the Rakan Muda Programme, which had been dormant for a long time. The Honourable Kepala Batas hopes that the RM22 million to be invested can help develop young people, and young people are national assets. The Honourable Kepala Batas requests details from the ministry on how this allocation will be spent. On 12 September 2024, BERNAMA reported that the Minister of Youth and Sports was studying suitable incentives to attract young people to join the Rakan Muda Programme. What have these incentives achieved so far, and what are the incentives in question? The Rakan Muda Programmes introduced this time appear rather different from the programme changes compared with the earlier versions. Therefore, the Honourable Kepala Batas requests further details on the 10 programmes introduced under this youth programme. How will it help young people in dealing with issues related to social, religious, cultural, economic and also national matters? How many District Rakan Muda Complexes have been built or will be built up to now, and will such a complex also be built in Kepala Batas? Are there complexes built according to type of sport or use, because if we look at the 10 programmes highlighted, it seems that a racing circuit would have to be built to carry out the Rakan Litar Programme? Please clarify. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Kepala Batas. I invite the Honourable Beaufort.

Datuk Siti Aminah binti AchingUMNO · BNBeaufortEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi taala wabarakatuh and greetings of peace. Thank you, Madam Chairman. I wish to debate the 2025 Budget at the Committee stage for the Ministry of Youth and Sports regarding the budget for the purpose of Development P45 for Item 02400 – Sports Venues and 07000 – Maintenance of Buildings and Facilities of the Ministry of Youth and Sports. Madam Chairman, the Ministry of Youth and Sports is a ministry that has a very important role in developing the character of youth and shaping the identity of society towards a better direction. For that reason, the ministry's initiatives

Datuk Siti Aminah binti AchingUMNO · BNBeaufortEN

in establishing sports courts as a youth recreational activity is an effort that must be continued. I refer to the oral reply of the Honourable Deputy Minister when answering my question on sports courts in Beaufort, which informed that 11 sports court facilities have been built in Beaufort. Among them are Pekan Kuala Penyu, Pekan Kampung Berangkup, Pekan Menumbok, Kampung Kerukan, Kampung Bundu and Pekan Beaufort. Of the 11 existing sports facilities, nine have been declared damaged. I would like to ask the ministry: after the construction of these sports courts is completed, will the Ministry of Youth and Sports (KBS) obtain a collection, with respect, of data from the Department of Youth and Sports in the district concerned on 'value of money', with respect, for those sports courts? Why does the ministry not simply appoint the youth associations in the district concerned that are registered under ROI to manage and ensure these sports courts always function well, if the district Department of Youth and Sports cannot manage the sports courts that have been built? I request that the ministry allocate funds to repair the nine sports facilities that have been built and declared damaged, so that they can be used by all youths and the local community for healthy recreational activities. This is also to ensure that the courts are not left abandoned and do not cause losses to the government.

Datuk Siti Aminah binti AchingUMNO · BNBeaufortEN

Madam Chairman, I would also like to refer to the application for a project to build new futsal courts in Kampung Kabidang and also Kampung Muhhibah, Beaufort. For information, the proposed land site for the futsal court in Kampung Kabidang is government reserve land that has been gazetted as village land, with a population of 800 people and approximately 250 houses. Likewise, Kampung Muhhibah has a population of approximately 1,890 people with more than 300 houses. Madam Chairman, this application was submitted on 22 September 2023 to the Ministry of Youth and Sports (KBS) for consideration and approval. During the previous oral question and answer session, the Honourable Deputy Minister gave a commitment to approve this application. My question is, what is the latest status of the application to build futsal courts in Kampung Kabidang and also Kampung Muhibbah? Madam Chairman, finally, I would like to refer to Item 07000 – Maintenance of Buildings and Facilities of the Ministry of Youth and Sports. Madam Chairman, the Beaufort Sports Complex was built on 1 July 2009 and began operating on 31 July 2011. This sports complex has brought many benefits to the residents of the Beaufort Parliamentary constituency in producing athletes who contribute to the development of national sports. In addition, this sports complex is used as a venue for large-scale celebrations and programmes in the Beaufort Parliamentary constituency.

Datuk Siti Aminah binti AchingUMNO · BNBeaufortEN

On that basis, it is time for the government to upgrade this sports complex by installing floodlights and building facilities such as a multi-purpose hall for the use of the community around the Beaufort Parliamentary constituency. I request that the ministry consider this application and channel allocations for the benefit of the people of the Beaufort Parliamentary constituency in particular and the wider community in general. That is all, thank you, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Beaufort. I now invite the Honourable Member for Jeli.

Tuan Zahari bin KechikBERSATU · PNJeliEN

Thank you, Mr Chairman. Jeli would like to touch on Item 00100 – National Youth Skills Institute (Institut Kemahiran Belia Negara, IKBN). The IKBN Tanah Merah is the IKBN closest to Jeli, located in the Tanah Merah Parliamentary constituency. At this IKBN, only one skills course is offered, namely textile technology. With recent developments, in line with contemporary demand, it is proposed that IKBN Tanah Merah add other skills courses such as automotive technology, building construction, automotive paint and so on. Second, Item 02400 – Sports Courts. There is an increase next year of RM23 million. With this increase, Jeli requests that the government consider urgently building new sports courts in areas that do not yet have court facilities, especially in rural areas such as Jeli, in line with the increase in allocation mentioned earlier. The eagerness of youths and young people for these sports courts has been demonstrated by the Gemilang Kampung Bukit Tok Ali Youth Association, Jeli. In August last, a group of 50 youths at that place, together with the AADK Jeli, carried out gotong-royong to clear, cut trees and clear overgrown bushes on a piece of government reserve land measuring 3.3 acres to be made into a sports court in their village. Alhamdulillah, the land that was formerly scrubland, a small forest and a habitat for animals, through that gotong-royong, they have succeeded in turning the scrubland into a playing field despite being lacking in every way. The same happened in Kampung Lawang. A piece of land reserved by an individual who was generous enough to endow the land as a playing field measuring two acres. Residents there carried out gotong-royong and now use the field as a playing field, and we have named the field 'Padang Rakyat' in line with the name of the people's sacrifice in creating the field. Therefore, I request that the government help upgrade this field and turn it into a better-equipped sports court with various facilities. Third, Item 06000 – Community Sports Development. Next year, RM25 million has been allocated for this item. For what purpose is community sport created? Among other things, it aims to encourage and develop various types of sports at the community level, maintain good relations within the community, and create a healthy community. But, most importantly in my view, it is to produce sports champions without having to rely on talent being shaped by the major associations or the National Sports Council. The question is, if these talents emerge in the community or at the grassroots, do they stop there without attention from the major associations or the state sports councils or the National Sports Council? How will these talents be brought forward if there are no initiatives taken by any party that should be responsible? In 2015, 2016, 2017, and late 2018, FAM, in cooperation with Bank Rakyat, organised a people's football league participated in by every football association at the district level in our country. This tournament was very good and effective in searching for and unearthing new talent in the field of football at the community level and at the grassroots. My district Jeli, for example, as a result of this league, succeeded in bringing Jeli to the quarter-finals at the national level. Just imagine, in a place we never expected, football talents emerged who can be showcased at the national level. Therefore, I urge the ministry to consider, together with sports associations, especially FAM, together with the private sector or any agency or NGO with an interest, reinstating this league so that hidden talents in rural areas can be unearthed and not lost simply with the passage of time. In closing, the importance of the young generation in shaping and being the backbone of the nation's future has been expressed in the saying "Pemuda harapan bangsa, pemudi tiang negara" (Young men are the hope of the nation, young women are the pillars of the country). The first President of Indonesia, Soekarno, once said, with full confidence he said, "Give me ten young men, and I will shake the world." Thus, Jeli wishes to state how powerful the spirit of young people is if it is nurtured, but how wasteful it is if that spirit is squandered. That is all, thank you.

Tuan Zahari bin KechikBERSATU · PNJeliEN

community sport, among others, is intended to encourage and develop various types of sports at the community level, maintain good relations within the community, and create a healthy community. But, most importantly in my view, it is to produce sports champions without having to rely on talent being shaped by the major associations or the National Sports Council. The question is, if such talents emerge in the community or at the grassroots, do they stop there without attention from the major associations or the state sports councils or the National Sports Council? How will these talents be brought forward if no initiatives are taken by any party that should be responsible? In 2015, 2016, 2017, and late 2018, FAM, in cooperation with Bank Rakyat, organised a people's football league participated in by every football association at the district level in our country. This tournament was very good and effective in searching for and unearthing new talent in football at the community level and at the grassroots. My district Jeli, for example, as a result of this league, succeeded in bringing Jeli to the quarter-finals at the national level. Just imagine, in a place we never expected, football talents emerged who can be showcased at the national level. Therefore, I urge the ministry to consider, together with sports associations, especially FAM, together with the private sector or any agency or NGO with an interest, reinstating this league so that hidden talents in rural areas can be unearthed and not lost simply with the passage of time. In closing, the importance of the young generation in shaping and being the backbone of the nation's future has been expressed in the saying "Pemuda harapan bangsa, pemudi tiang negara" (Young men are the hope of the nation, young women are the pillars of the country). The first President of Indonesia, Soekarno, once said, with full confidence he said, "Give me ten young men, and I will shake the world." Thus, Jeli wishes to state how powerful the spirit of young people is if it is nurtured, but how wasteful it is if that spirit is squandered. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Jeli. I now invite the Honourable Member for Kampar.

Tuan Chong ZheminDAP · PHKamparEN

Thank you to the Deputy Chairman. I will move straight to Item 01800 – Preparations for International Sports. Deputy Chairman, last year, here in Parliament, I raised the issue that the national table tennis team was not permitted, or not given the opportunity, to take part in the Hangzhou 2023 Asian Games. At that time, the Olympic Council of Malaysia was of the view that any sports team that was not in the top eight

Tuan Chong ZheminDAP · PHKamparEN

at the Asian Games should not be sent to the Asian Games, because they considered the Asian Games to be a major sporting event and not an opportunity to gain experience. Today, we see this was a very wrong decision, because the Malaysian men's table tennis doubles team recently, at the Asian Championship, obtained third place and defeated China's number one doubles pair, Lin Shidong and Lin Gaoyuan. Our men's doubles, Wong Qi Shen and Choong Javen, not only caused a surprise but also this is a record we have never achieved before; we obtained third place in the Asian Championship. This is a mistake that I feel we cannot repeat. I hope the Olympic Council of Malaysia― to this day they have not given any feedback. I hope they can give feedback because the mistake of not sending the table tennis team, now all the burden is under the ministry. But, I know this is not the ministry's decision. The Olympic Council of Malaysia must come out with a statement that they made a mistake. This is a mistake they should not have made, and they must give a commitment that in future they will send the table tennis team to take part in the Asian Games. Secondly...

I want to— I apologise, Kampar. Regarding the table tennis issue. The mistake that the Honourable Member has just raised, that the table tennis athletes should have been given the opportunity.

Does the Honourable Member think that the ministry can help in the process of giving them opportunities in the future so that they can achieve victories to bring honour to the country's name. What is the role of the ministry in this matter, in the Honourable Member's opinion. Thank you.

Tuan Chong ZheminDAP · PHKamparEN

Thank you, Bukit Gelugor. The ministry can indeed negotiate with the OCM, but the final decision is made by the OCM, and I hope the OCM will look at the long term, we should look at the long-term period. This is because, at that time, the Malaysia Table Tennis Association had given its commitment to fully finance the expenses to take part in the Asian Games, but approval was not given. I feel this is not right. Second, regarding Item 00616 – Special Training Centre. I obtained information on the internet or in news reports that the investment amount for bicycles for Datuk Azizul is RM7.5 million from MSN. So I want to ask, after the competition, who owns these RM7.5 million bicycles and what will happen to these bicycles? Will we sell them or will we let Datuk Azizul continue to use them? I understand bicycles are a strength for our sports, but we are investing millions for one type of sport. For badminton, for diving. Does this provide a commensurate return

Tuan Chong ZheminDAP · PHKamparEN

back to us? Why do we not look at sports that have potential, such as squash, such as table tennis, perhaps pickleball in the future. So I hope the ministry can also look at these sports with potential, and we know squash will be included in the Olympic Games, and 10 years, 20 years ago, Nicol David was a world-class squash player. Every time she entered, we knew she must be champion, and why today can we not get a player like Nicol David? So I hope perhaps the ministry can look at this matter and also pickleball. Pickleball is a very popular sport at this time, and pickleball has not yet been included in any international sport, but I see its potential is very high. Perhaps within 10 years pickleball will become an international sport. So I hope the ministry can look at this trend and invest in more pickleball courts across Malaysia, because I now see many courts from private parties. They build them, and every time they build pickleball courts, they are all full. So I hope the ministry can also help in this matter. Okay, that is all.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Kampar. I now invite the Honourable Member for Sungai Besar.

Datuk Muslimin bin YahayaBERSATU · PNSungai BesarEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Good afternoon. Thank you, Mr Chairman. I will go straight to Item 00100 – National Youth Skills Institute (Institut Kemahiran Belia Negara, IKBN) and Item 00110 – Skills Development Programme under the Ministry of Youth and Sports (KBS). Mr Chairman, we are aware that the Ministry of Youth and Sports provides space and a second chance for skills learning for school leavers with SPM who are interested in technical and vocational fields as well as skills, and we also know that there are currently 21 IKBNs across the country, including in Sabah and Sarawak. These IKBNs, Mr Chairman, have been around for a long time. Very long. The history begins from the Balai Muda Mudi Kebangsaan in Morib in 1954, oriented towards culture, arts and community work, and finally IKBN Peretak, this is the first IKBN, established in 1964. It is now 60 years old, with enough experience in administering and managing an institution, Mr Chairman. Tens of thousands of IKBN graduates have been produced and are working in various sectors of industry, construction and manufacturing. With this 60-year age, as an institution of skills education, I think the time has come for IKBN to be elevated into a university or at least a university college, to uplift the dignity of the youth to obtain higher skills education up to degree level and so on, in line with the talents, interests and inclinations as well as the needs of the youth group itself. Mr Chairman, this is the time for us to seriously and comprehensively apply TVET skills education, a learning based on work-based learning or career-based education

Datuk Muslimin bin YahayaBERSATU · PNSungai BesarEN

seriously and comprehensively. The establishment of a national youth skills university will increase the contribution of youth, the contribution of highly educated expert manpower, and can bring this country to greater progress. I give the example of the Malaysian Cooperative Institute (IKMa) under KUSKOP, which now has and has upgraded IKMa into a university, namely the Malaysian Entrepreneurship and Cooperative University (UKKM), offering degree-level studies. Graduates of this university will later look after the interests of more than 15,000 cooperatives and more than 7.3 million members, just as with the youth group, Mr Chairman, which today is nearly 15 million young people. That is why this is the time for IKBN, even though it was upgraded to the National Youth Higher Skills Institute (IKTBN) in 2014, but taking into account the current situation, so my question is, are there any proposals from KBS and the government, particularly to make a serious study to establish a university for youth. As a continuation of the IKBN and IKTBN institutions. Second, I want to refer to Item 02400 – Sports Courts and I specifically refer to futsal courts under KBS. I want to ask, how many futsal courts are there across Malaysia now? How many courts are still active? How many courts are dilapidated and not used, and how many courts have been returned to landowners? Regarding futsal courts, which are mostly dilapidated, what efforts does KBS make to ensure these courts can be used and made places for young people to play sports? How much specific allocation is set aside for repairing these courts, especially in the Sungai Besar Parliamentary constituency? So that is all, Mr Chairman. Thank you from Sungai Besar.

Setiu, a quick interjection, Sungai Besar. Are you finished already?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Yes, go ahead with interjections. There is still time.

Datuk Muslimin bin YahayaBERSATU · PNSungai BesarEN

Please, please. Yes, yes. There is time.

Okay. Regarding the futsal courts just now, I want to raise the issue related to open futsal courts that were built by KBS. I found that most, almost all of these open futsal courts, are no longer usable and need maintenance from KBS, but I was informed that KBS is in the process of disposal and handing over to the state government for repairs. So, what is Sungai Besar's view if I suggest that KBS should provide allocations to maintain these futsal courts again. Thank you.

Datuk Muslimin bin YahayaBERSATU · PNSungai BesarEN

Thank you, Setiu. I agree and will include it in my debate. I ask the Honourable Minister to give attention to what has been raised by Setiu and Sungai Besar. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Sungai Besar. I now invite the Honourable Member for Sipitang.

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. Thank you, Madam Chairman. Firstly, I would like to touch on Item 00601 – Upgrading of State Youth and Sports Complexes, together with Item 02400 – Sports Arenas and Item 07000 – Maintenance of Buildings and Facilities of the Ministry of Youth and Sports (KBS), which relate to several sports facility improvements in the Sipitang Parliamentary constituency that I would like to propose. I welcome the statement made earlier by the Honourable Minister, which encouraged Members of Parliament to inspect or monitor the existing sports centres in their respective areas for upgrading, since this does not involve high costs compared with submitting new applications. Following that suggestion, I would like to draw the ministry's attention to two existing sports complexes in the interior of the Sipitang and Beaufort districts. At present, these sports complexes already have several facilities such as a running track, a football field, volleyball courts, sepak takraw, basketball courts and futsal, which are very beneficial to local residents and to the local youth in cultivating the elements of sport and a healthy lifestyle. However, the activities carried out at these complexes are somewhat disrupted, especially at night, due to the lack of adequate lighting, which limits sporting activities and also endangers the safety of users of the complexes. Therefore, I would like to seek the attention of the Honourable Minister on the extent to which the ministry is considering the installation of floodlights at the complexes, so that residents or the people can use the facilities at night.

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

In addition, I would also like to request the ministry's consideration to add several other sports facilities at the complex, such as a skate park, with permission, indoor games hall, with permission, a hockey field, a bowling green, a swimming pool, a tennis court and timber wall climbing, with permission, so as to make the complex a one-stop centre, with permission, for sporting activities in the Sipitang Parliamentary constituency, so that it is able to develop new talents in the area. The lack of suitable sports facilities has always been a constraint in Sabah, and this has also been one of the factors behind Sabah's withdrawal as a co-host of the 2027 SEA Games. Therefore, I request that the ministry evaluate my application, which would indirectly bring long-term benefits to the development of sporting talent in Sabah through the hosting of sporting events at higher levels, such as the Sabah Games (SAGA).

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

Furthermore, I would also like to touch on Item 06000 – Community Sports Development. What is unique in Sipitang is that we have exceptional talents who have been brought to the fore through archery, such as athletes born in Sipitang. For your information, Rohayati Tarip and Ismail Jumad won third place at the European Traditional Open (ETO) Archery Championship in Germany in 2023. This is an outstanding and proud achievement for the people of Sipitang, and I see an opportunity for the ministry to establish an archery activity centre to strengthen the development of archery as a community sport among the people of Sipitang. Therefore, I would like to seek the views of the Honourable Minister on the extent of the ministry's readiness to establish an archery activity centre in Sipitang, which is increasingly gaining ground among local residents? Next, under Item 020000 – Youth and Sports Development, I would like to raise the matter of the Registrar of Youth Organisations (ROI). I am aware of the importance of nurturing leadership skills among youth through the movement of youth clubs at the grassroots level. It is through these youth organisations that their ideas and aspirations are heard, and they also serve as a platform and institution for rural youth in an important platform, whether at state or national level. Hence, I would like to ask, to what extent is the participation of youth in the interior areas of Sabah in the establishment of youth clubs under the ROI? What are the details of the ministry's plans to ensure that youth in the establishment and recognition of youth clubs in the interior areas of Sabah, especially in Sipitang, can be enhanced? I request that the Honourable Minister explain. Thank you, Madam Chairman. Sipitang requests to support.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Sipitang. I invite the last debater, the Honourable Member for Miri.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you, Madam Chairman. I would like to refer to Item 02007 – Community Sports Complex. I am not sure which one exactly, but first, I would like to express my thousands of thanks to the government – KBS for providing funds of RM1.5 million to upgrade sports facilities in Miri. It is understood that RM1 million has been given to upgrade sports facilities, consisting of repairing the new water filtration system of the Miri public swimming pool and RM500 thousand for the volleyball courts in Miri. So, many thanks to KBS. I would like to submit under Item 00100 – National Youth Skills Institute (IKBN). Honourable Minister, actually IKBN in Miri still has a large vacant plot of land which can definitely be utilised to introduce a course

Tuan Chiew Choon ManPKR · PHMiriEN

on the maintenance and repair of air vehicles such as helicopters, jets and so on. This is because Miri is an important city for us to provide rural air services in the interior areas, and also to oil and gas platforms and so on. Therefore, IKBN Miri really needs and also has the potential to set up a special course in this field. I also got – perhaps the officers of IKBN Miri also requested that the teaching staff be given opportunities to obtain TVET courses, especially overseas, so that they can be equipped with the latest technology and skills. Likewise, I request that IKBN Miri, especially its sports facilities, be further improved, such as an indoor court for futsal and so on. Next, Madam Chairman, I would like to refer to 031300 – Rakan Muda Programme. I would like to take this opportunity to share several questions that are relevant to the future of youth, particularly in the role of KBS in forming a young generation that is competitive, self-reliant and visionary. Madam Chairman, the Rakan Muda Programme was once a major movement of its time, uniting young people across the country in a spirit of service to the homeland. However, questions now arise. Is Rakan Muda merely limited to organising activities like a youth association? We need to revive the philosophy of Rakan Muda as a national youth movement. Countries such as Finland, through the Youth Guarantee Programme, have succeeded in connecting youth with employment opportunities, skills training and education. This programme has succeeded in lowering the youth unemployment rate in Finland. Therefore, my question to the ministry is, what success indicators are used to measure the effectiveness of this Rakan Muda Programme? How can this programme not only involve more youth, but also have a major impact on their lives in the long term, especially in terms of capacity building, economy and social cohesion? We can...

Miri, may I interject briefly?

Boleh, boleh.

Okay, thank you, YB Miri. I was interested just now when YB touched on Rakan Muda. In my debate I also spoke about Rakan Muda. I said that I agree with what Miri said, that in the 1990s, the era of my generation, the era of the Honourable Minister's generation, Rakan Muda was indeed a well-known programme that became a movement, and now it has a new lease of life with RM22 million and so on. Only I would like, if possible, Miri, do you agree that we look at how Rakan Muda can be strengthened by appointing Rakan Muda ambassadors in every Parliamentary constituency? Just like what has been implemented in Selangor, namely the Selangor Youth Facilitators (Penggerak Belia Selangor), where in every PBT zone there are youth facilitators for that zone.

Perhaps we do not need to have ambassadors in every zone, but perhaps in every Parliamentary constituency, Rakan Muda Ambassadors who know best how to hold programmes within that Parliamentary constituency. Because we know – the best for young people are young people themselves, they know best what is good for them. Agree or not, with permission, YB Miri? Thank you.

Tuan Chiew Choon ManPKR · PHMiriEN

Very much agree, YB Bangi. Please include it in my speech, but Madam Chairman, please grant me additional time to debate this issue. It is important for young people.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Satu minit.

Tuan Chiew Choon ManPKR · PHMiriEN

Okay, thank you, Madam Chairman. Next, I would like to refer to 020000 – Youth and Sports Development. Madam Chairman, youth need more than just sports programmes and activities. It cannot be denied that these are quite important, but in the context of an increasingly challenging economy, we need to open wider space for young people to build their lives and future. At present, I see that we lack specific initiatives such as grants to support young entrepreneurs. In countries such as South Korea, the Youth Startup Academy programme has provided various types of funds, training and incubation to help youth start businesses. As a result, more than 50,000 jobs have been created by young entrepreneurs, contributing to the country's economy and contributing to South Korea's economic development plan in the field of technology and innovation. My suggestion to the ministry is to establish a youth entrepreneurship grant that is open to all, especially the B40 group, to start businesses or innovative projects. Programmes like this need to focus on those who have not received opportunities in the mainstream, such as TVET graduates and rural youth. Finally, in conclusion, Madam Chairman. I would like to state that economic issues are the main driver of awakening, and they make these young people sometimes behave rebellious or anti-establishment, with permission. In their lives, youth face important phases that will bring high economic pressure. After graduation, they must look for jobs with lower salaries because of lack of experience. When they start to reach adulthood, they face high cost of living. Buying a car, a house and wedding expenses. After that, as age increases, commitments to family and children add financial pressure. Chairman, I am 33 years old and this is what I have experienced as a young person. We have to finish, complete university, look for work. After that, facing various life pressures in terms of finances as we get older.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Chiew Choon ManPKR · PHMiriEN

Okay. So, I hope KBS can also focus on the economy of young people. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Miri. The Honourable Minister will reply after 2.30 pm. Honourable Members, the House will resume as the House of Representatives. [The House resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the sitting is suspended and will resume at 2.30 pm. Thank you.

[The sitting was suspended at 1.01 pm]

[The sitting resumed at 2.30 pm]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

[Dato' Indera Mohd Shahar bin Abdullah (Paya Besar) in the Chair

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace to Honourable Members. The House is in Committee. [The House is in Committee] [Dato' Indera Mohd Shahar bin Abdullah (Paya Besar) in the Chair

Before I invite the Honourable Minister to reply, as a guide, the Honourable Minister may answer the issues raised by Honourable Members who are present in the House. Honourable Members who are not in the House will be given written replies within five days to the Honourable Members concerned. The Honourable Minister of Youth and Sports, please reply for 20 minutes.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

Thank you, Mr Chairman. I thank the 15 Honourable Members who have submitted questions, views and suggestions to the Ministry of Youth and Sports during the debate on the Supply Bill 2025, namely the Honourable Member for Kudat, Alor Setar, the Honourable Member for Bangi, Gerik, Kuala Pilah, Permatang Pauh, Kangar, Batang Sadong, Kepala Batas, Beaufort, Jeli, Kampar, Sungai Besar, Sipitang and Miri. Overall, the matters raised by Honourable Members cover issues related to youth, sports, TVET, and sports facilities and amenities.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

First, allow me to express my appreciation to the Right Honourable Prime Minister and the MADANI Government for the increase of 2.07 per cent in the Development Allocation. For 2024, RM488 million to 2025, which is RM498 million, and 10.62 per cent for the Operating Allocation from RM567 million for 2024 to RM628 million for 2025. Mr Chairman, the allocation received by KBS is not much. Only RM1.1 billion last year. However, KBS has succeeded in utilising the allocation by creating high value, with permission, return of value for various grassroots initiatives and high performance as follows. One, healthy lifestyle for senior citizens through the organisation of sports for adults aged 40 years and above as well as senior citizens through the Masters Games. I think this is a game changer because Malaysia will become an ageing nation when 15 per cent of the population is aged 60 years and above. This year, senior citizens in our country make up 11.6 per cent of a population of 34.1 million. The Masters Games 2024, which just concluded last week, was held at Bukit Jalil with the participation of 1,522 participants aged 40 years and above, including senior citizens. We even received applications from a 90-year-old wishing to take part. Therefore, we want to encourage sports for all. Sports for all. Second, swimming classes for the less fortunate among children and B40 senior citizens. Throughout this year, a total of four phases of swimming classes were held at 222 locations nationwide – 192 locations for B40 children, 15 locations for children with disabilities and 15 more locations for senior citizens, benefiting a total of 8,880 participants. The use of stadiums or sports facilities free of charge for school students, especially for sports days, with the aim of giving children the opportunity to experience running on the running track. In 2023, a total of 13,650 students, and up to October this year, a total of 16,000 students have had the opportunity to play sports at KBS stadium facilities free of charge, especially in Bukit Jalil. Fourth, exemption of rental fees for facilities and amenities under KBS for use by government schools. Fifth, administrative assistance to youth organisations is a strategic collaborative approach by KBS for the empowerment of registered youth. The Malaysian Youth Council was allocated RM5 million last year. Meanwhile, RM5 million in 2025. This administrative assistance is for the use of national-level Youth Organisations, State and District Youth Councils as well as the joint uniformed bodies of MBM. As a promotional step for the Youth and Youth Development Act 2007, KBS from time to time implements engagement on the youth transition plan through KJOM, which is conducted by the Honourable Deputy Minister of Youth and Sports throughout the country. A total of 21,365 youths have participated in 25 engagement sessions up to 14 September this year. What we want is not only for youth to come to Kuala Lumpur or Putrajaya,

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

but the Deputy Minister himself has toured every state to hold engagement sessions to hear their views. Assistance to sports associations and clubs has been put in place. The MADANI Government has established the Sports Matching Grant. For the information of all, a total of RM35 million has been approved for 307 applications. The Community Sports Fund of RM19 million has been approved for 1,207 applications, and the National Sports Trust Fund of RM4 million has been approved for 72 championships. The disbursement of these funds and grants is intended, among other things, for hosting championships to prepare and identify athletes, as all the Honourable Members have debated, so that we can seek young talent. As a result, the Malaysian sepak takraw team emerged as champions in the World Sepak Takraw Championship this year. A total of RM1 million that we allocated under the Sports Matching Grant was disbursed to the Malaysian Sepaktakraw Association for this championship. The Persatuan Karate Wilayah Persekutuan Putrajaya received the same amount, RM200,000, to organise an open karate championship. As a result, 60 gold medals were won by Malaysia. Furthermore, five of the athletes who took part in this championship also succeeded in winning gold medals for the states they represented during the recent SUKMA. The Persekutuan Wushu Malaysia received RM310,000 for the organisation of the 13th KPM WFM Youth Wushu Championship. A total of 14 athletes succeeded in winning 10 gold medals, 14 silver medals and five bronze medals overall at three World and International Wushu Championships this year. The provision of a safe and healthy ecosystem through the safe sport code has also been implemented. The Sports Development Order has been amended to ensure that sporting activities are conducted in a safe environment and for the implementation of remedial measures for matters involving sexual harassment and abuse.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

The national motorsport scene continues to thrive and places Malaysia on the world map. Through the Sports Matching Grant for national championships, Malaysian rider Muhammad Aqil Putra, winner of the Malaysia Motocross Championship last year, succeeded in qualifying Malaysia for the Junior Motocross World Championship in the Netherlands this year. For 2025, KBS will continue this momentum through the Motocross Class and the Kapcai Class to encourage young people to take part in motorsport safely. Let us just look at the PETRONAS Grand Prix of Malaysia (MotoGP) this year, which recorded the highest attendance, a total of 184,000 spectators. Alright, I will go straight to answering the issues raised. The youth issue was raised by the Honourable Member for Bangi and the Honourable Member for Miri. The Honourable Member for Bangi is here. The same issue. A total of 23 Rakan Muda programmes were implemented in the Hulu Langat district, including Bangi, this year, covering the Rakan Prihatin, Rakan Bumi, Rakan Muzik, Rakan Aktif and Rakan Mahir Lifestyle Programmes.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

For next year, the Rakan Muda Programme will continue to be implemented in all states and districts, including Bangi, with focus given to competition-based programmes as a platform for showcasing the talents of young people in various fields. The Rakan Muda Big Screen Programme will be considered for continued implementation following the very encouraging response. Regarding big screen screenings, with permission, big screen to local community members in all states. This year, a total of 157 big screen screenings were held with a total audience of 156,482 people nationwide. Among the screenings that received a warm response was the 2023 Asian Cup football match, Malaysia versus Bahrain, which was attended by 46,555 people. The Honourable Member for Permatang Pauh and the Honourable Member for Kepala Batas also raised the Rakan Muda issue. For next year, Honourable Member, the ministry will continue the 10 Rakan Muda lifestyles. The ministry will also implement and expand competition-based programmes as I have answered, at the national, district and state levels. Why competitions? Because when there is a competition, whether for sports or youth, it means there is training, and this training is what is needed to fill free time. If we just hold programmes for the sake of it, people come once or twice, it brings no benefit, but if we hold competitions, we can discover talent, and we know for certain that every week these young people will continue to train to achieve good results. The Rakan Muda Programme will be strengthened at school and IPT levels. It will also be implemented in collaboration with implementing partners comprising various ministries and government departments, NGOs, IPTs and youth associations. The Rakan Muda Programme also focuses on youth mental health issues, Rakan Prihatin, democracy education, unity and patriotism, and the building of positive youth identity through the 10 Rakan Muda lifestyles. Regarding incentives for Rakan Muda participants, the participation of Rakan Muda participants will be counted in the assessment of school sports, physical education and co-curricular activities, which becomes an added value for pursuing education at higher levels, namely the Bronze level, 5 marks; Silver level, 7 marks; Gold level, 10 marks. KBS will explore more other incentives together with KPM and KPT for the participation of school and IPT students in the Rakan Muda Programme, and will also explore other incentives with private sector parties with whom we have a strategic partnership, namely Grab, Shopee, Lazada and Foodpanda. However, we are still obtaining data from these strategic partners because they distribute discount vouchers for Rakan Muda participants. Rakan Muda participants also have the opportunity to join other youth development programmes under KBS relating to leadership, entrepreneurship and skills, to produce young leaders among youth and to open opportunities in entrepreneurship and skills. For scopes where KBS does not have expertise, we rely heavily on the expertise of other ministries. I will give an example

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

for entrepreneurship, the implementing partner together with KBS is indeed KUSKOP. For youth agriculture, we collaborate with the Ministry of Agriculture. The Honourable Member for Miri, but the Rakan Muda issue too. Okay, I will skip. The Honourable Member for Alor Setar and the Honourable Member for Batang Sadong, IYRES. The Malaysian Youth Development Research Institute (IYRES) carries out its function as the National Youth Development Research Centre. For next year, an allocation of RM1.6 million is for three national-level studies under the Twelfth Malaysia Plan, under the allocation of the Ministry of Economy. Among the studies are the study on the potential, competitiveness and employability of youth in employment, education and training. Implementation is in 2024 and 2025. Regarding political education, in line with the 18-year-old voting age and the provisions in the Twelfth Malaysia Plan, KBS is implementing democracy and citizenship education through the Rakan Demokrasi Kuasa Orang Muda. This programme aims to raise youth awareness of the parliamentary democratic system practised by the country. The Rakan Demokrasi Kuasa Orang Muda programme is implemented by the National Youth and Sports Department (JBSN) and Impact Integrated, both of which are KBS agencies. For next year, a total of RM37,235,000 has been allocated under JBSN for the implementation of the Youth Development Programme at state and district levels throughout the country. Previously, i-LEAD was indeed under KBS, but now it has been transferred to the Prime Minister's Department and renamed as the Akademi Kenegaraan (Civic Academy). So, many specific citizenship education projects have all been parked under them. What we implement is under JBSN and Impact. For the Honourable Member for Alor Setar and the Honourable Member for Bangi, regarding youth mental health. The ministry, through IYRES, together with the United Nations Children's Fund (UNICEF) Malaysia, has developed the Malaysia Youth Mental Health Index 2023 as an important measurement tool to assess the level of mental health of Malaysian youth aged 15 to 30. This study recorded that the youth mental health index is at a moderate, satisfactory level with a score of 71.91, and shows that Malaysian youth are at moderate risk of facing mental health problems. This measurement takes into account seven domains that influence youth mental health, namely a healthy mind, lifestyle, environment, individual personality, life experience, stress management and social support. IYRES has also developed guidelines for addressing youth mental health issues in Malaysia last year, which can be accessed through the IYRES website, iyres.gov.my. These guidelines are for the reference of individuals, youth and the public to gain exposure on mental health, address societal stigma and provide guidance in facing mental health issues. In addition, KBS and JBSN have implemented several programmes to raise awareness and provide support to youth facing mental health problems, especially within the Rakan Muda Programme, in collaboration with several NGOs through the Befrienders Webinar and Mental Boy Lifesaver Programmes, as well as booth activities in the implementation of KBS's iconic programmes, such as the offer of mental health screening and advocacy.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

The ministry is also establishing a strategic collaboration with the Ministry of Health, namely under the National Mental Health Excellence Centre. They offer advisory services and support to young people facing stress, anxiety and depression. Through this initiative, the services that can be provided to youth who need help and support are such as counselling and hotlines from qualified counsellors and experts in the field of mental health. The ministry also implements the Rakan Muda Programme through the 10 lifestyles that are seen to be able to have a positive impact on youth mental health. With youth participation in programmes of this kind, youth are able to know themselves better through sports, arts and social activities. This also helps youth recognise their potential, strengths and weaknesses, and provides space for them to develop the ability to manage stress and emotions. For the information of the Honourable Member as well, we will also use social media next year to produce awareness promotional videos to assist other ministries that have expertise, such as the Ministry of Health. KBS will help raise awareness and refer youth in need of help to appropriate platforms. The Honourable Member for Alor Setar also raised the issue of the National Hockey Stadium together with the Honourable Member for Permatang Pauh. The National Hockey Stadium has already been used as a concert venue three times this year, and two more are coming up until the end of this year. So far, there has been no damage to the surface of the National Hockey Stadium because the National Stadium Corporation has developed an SOP suitable with the cooperation of the hockey turf supplier.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

Any bookings will have to go through strict SOP compliance processes. For example, covering the turf with padding recommended by the original hockey turf supplier to support the weight. Secondly, for information as well, there are actually two hockey pitches at the National Hockey Stadium, where Pitch 2 is dedicated to the national hockey team for development and training purposes. For Pitch 1, or the main pitch, priority is always given to the hosting of hockey events of international and national standard. The usage ratio of the hockey stadium is 60:40, where 60 is for sports and 40 is for non-sports. For the information of the Honourable Member, concert events will only be permitted if they do not clash with hockey events. So, engagement with the National Hockey Association is always there, exists, and in fact these discussions existed before the Stadium Corporation made the decision to generate special income from the use of the hockey stadium as a concert venue.

Puan Hannah Yeoh Tseow SuanDAP · PHMinister of Youth and Sports · SegambutEN

For the information of the Honourable Member as well, the hockey stadium is used by veteran hockey teams who are unable to pay the stadium rental fee. So, there are several groups who represent Malaysia but do not have such funds, and under the income generation from concert hosting, we can subsidise free of charge for groups that cannot pay rent to the Stadium Corporation. So, I give an assurance, there is no issue where our hockey performance is pawned for concerts. The Honourable Member for Jeli, is Jeli here?

Tuan Zahari bin KechikBERSATU · PNJeli

Ada.

Puan Hannah Yeoh Tseow SuanDAP · PHSegambutEN

Okay. One more minute. The Honourable Member for Bangi?

Ya, ada.

Puan Hannah Yeoh Tseow SuanDAP · PHSegambutEN

Okay. The ministry is aware of the potential that exists in e-sports. The ministry has recognised electronic sports, e-sports, as one type of sport and included it in the First Schedule of the Sports Development Act 1997 through the Sports Development Order (Amendment of First Schedule) 2023 last year. The Sports Victory Prize Scheme (SHAKAM) Incentive is recognition for national athletes who succeed in bringing honour to Malaysia through medal achievements at recognised international sporting events. This incentive is also available to national e-sports athletes who contribute medals at events such as the SEA Games and the Asian Games, which offer medals for electronic sports. For the success of e-sports athletes at the 2023 Hangzhou Asian Games, a total of RM72,000 was paid for winning one silver medal and one bronze medal through SHAKAM. Meanwhile, for the 2022 SEA Games in Cambodia, a total of RM12,750 was paid for two silver medals and two bronze medals. Esports Integrated (ESI) actually plays a role in energising and catalysing the local e-sports ecosystem. In an effort to bring forward new talent and provide a competitive platform at the grassroots level, the main e-sports championship led by the ministry through ESI, namely the Malaysia Esports League, has been held for four editions starting from 2021 until this year, which has attracted participation of more than 35,000 participants. There is much more, much more, but time does not permit. So, for the other Honourable Members, I will provide it in writing. Thank you to everyone who has helped support the expenditure budget for the Ministry of Youth and Sports. Thank you.

Thank you, the Honourable Minister of Youth and Sports. Honourable Members, the question is that the sum of RM628,109,600 for Head B.45 Operating Expenditure Estimates 2025 do form part of the Schedule be agreed to. [Question put and agreed to] [Head B.45 ordered to form part of the Schedule]

The question is that the expenditure under Head P.45 Development Expenditure Estimates 2025 be approved. [Question put and agreed to] [Head P.45 forms part of the Estimates]

Bill — Supply Bill 2025 and Development Estimates Motion 2025 Committee — Head B.28 [Schedule] – Head P.28 [Development Estimates 2025] –Bill

Honourable Members, Supply Head B.28 and Development Head P.28 under the Ministry of Transport are open for debate. List of speakers for the Ministry of Transport at Committee stage. The first speakers: the Honourable Member for Libaran; the Honourable Member for Jerantut; the Honourable Member for Klang; the Honourable Member for Merbok; the Honourable Member for Ipoh Timor; the Honourable Member for Setiu; the Honourable Member for Puncak Borneo; the Honourable Member for Padang Rengas; the Honourable Member for Sri Gading; the Honourable Member for Kuala Krai; the Honourable Member for Miri; the Honourable Member for Langkawi; the Honourable Member for Petaling Jaya; the Honourable Member for Kuantan; the Honourable Member for Tuaran; the Honourable Member for Bangi; the Honourable Member for Rompin; the Honourable Member for Bayan Baru; the Honourable Member for Padang Besar; and the Honourable Member for Tebrau. A total of 20 speakers. Time limit 5 minutes. I invite the first speaker, the Honourable Member for Libaran. Please proceed.

Datuk Suhaimi bin NasirUMNO · BNLibaranEN

Thank you, Mr Chairman, for the opportunity given to me to take part in the debate at the Committee stage of the Ministry of Transport. A total of RM6.596 billion has been allocated for 2025, an increase compared with 2024. Mr Chairman, Item 030300 – Rural Air Services (RAS) Subsidy and Item 040000 – New Policy. I would like to request a breakdown for the states of Sabah and Sarawak as well as details on the Rural Air Services Subsidy Programme. I thank the Honourable Minister for providing clarification on flight routes during the winding-up the other day. I would like to propose that the government provide a new policy to encourage airlines that wish to open new routes or increase frequency to Sabah and Sandakan in particular. Incentives such as airport tax exemptions or fuel subsidies for airlines are among the proposals that have been introduced. If these incentives are implemented, they will directly attract their interest in opening new routes. At the same time, these incentives can reduce operating costs and in turn encourage them to increase flight frequency. Another proposal is for the Ministry of Transport to work with the Ministry of Tourism to implement a promotional programme, the Sabah ecotourism campaign. Through this programme, tourists will be offered packages that include

Datuk Suhaimi bin NasirUMNO · BNLibaranEN

flights and visits to well-known destinations in Sandakan such as the Sepilok Orang Utan Rehabilitation Centre, Pulau Penyu National Park, Bornean Sun Bear Conservation Centre and many more. This will increase tourists' interest in choosing Sandakan as their destination, thereby increasing the number of flights there. The government is also proposed to expand the Rural Air Services route subsidy programme to encourage passengers from the interior to Sandakan. Expanding this programme will help strengthen connections between small towns and major cities and improve access to air transport. As for airlines, the government can help by providing direct subsidies to reduce their operating costs. Mr Chairman, for Item 020600 – Civil Aviation Authority of Malaysia (CAAM) and also Item 040100 – Flight Ticket Subsidy (Flysiswa and Festive Seasons), I would like to express appreciation to the government for introducing the Flysiswa initiative and providing subsidies on ticket prices during festive seasons. In Budget 2025, a total of RM48 million has been allocated for these initiatives. Therefore, I would like to request details and a breakdown of the programme. As has been informed before, airfares to Sabah from Peninsular Malaysia and vice versa are expensive, especially during weekends, school holiday seasons and also festive seasons.

Datuk Suhaimi bin NasirUMNO · BNLibaranEN

It is appropriate for the government to continue discussions with airlines so that they do not raise prices but instead increase the frequency of flights to Sabah during that period. It is also proposed that the government provide various forms of attractive incentives or tax exemptions that can be offered to them. This will directly help to ease the burden of the operating costs they bear. Through this proposal, the tourism and local economy can also be generated and boosted. It will also be able to increase access to employment opportunities in Semenanjung and encourage investment to enter Sabah. Honourable Chairman, if these proposals can be implemented, they will help improve and make Sabah and Sandakan more easily accessible to tourists and investors while encouraging economic growth. I conclude with a quotation from Richard Nixon, former President of America: "Transportation is freedom, it is enable of opportunity and bring the world close together." Thank you.

Thank you, Honourable Libaran. Next, Honourable Jerantut.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you to Honourable Mr Chairman.

My first topic concerns the approval of the project for the Kulim Cargo International Airport (KXP). As the Honourable Minister is aware, we thank you. Indeed, the Ministry of Transport (MOT) has received an application from the Kedah State Government regarding the establishment of an aerodrome on 21 August 2024, and it is now in the hands of the Civil Aviation Authority of Malaysia (CAAM) and also the Malaysian Aviation Commission (MAVCOM) for review. For the information of the Honourable Minister, in line with the Twelfth Malaysia Plan, to strengthen the aerospace industry for the economic development of the people, KXP has been established as one of the main drivers of the Blueprint the Greater Kedah 2035. Therefore, we wish to emphasise that KXP has never been a competitor to the Penang International Airport. In fact, it is a complementary and supporting facility to the Penang International Airport, because with the increase in investment at the Kulim Hi-Tech Park and the Kedah Rubber City, which is well known to attract many foreign investors, it will increase the capacity of the Penang International Airport to receive more passengers in line with its target of reaching 12 million passengers, with the budget given by the government for its expansion. So, it is a complementary, symbiotic relationship between KXP and the Penang International Airport. We have been informed that this evaluation takes three months and is due for a decision in December this year. So, we request and appeal to the MOT in particular to examine this matter carefully so that it can be approved for the welfare of the people, especially the people of Kedah state and generally the northern states of Malaysia. Secondly, Mr Chairman, regarding the expansion of the capacity of Kemaman Port. I also wish to draw the attention of the Ministry of Transport to examine the ideas and proposals to enlarge Kemaman Port. Based on cargo projections, cargo handling will increase gradually up to 15 million metric tonnes by 2028. The projection is based on the operational demand of industry players that is centred on oil and gas, and exceeds the cargo handling capacity of the east berth, which totals 4 million metric tonnes along 648 metres. Because of its strategic location, and secondly because God Almighty has given Kemaman Port good depth compared with other ports, we have 18 metres of depth, and we need minor dredging activities for the port. So, here the Terengganu State Government appeals that we propose to increase the addition of one kilometre of wharf for a breakwater, widening of road access, land reclamation, modification of wave breakers and several other related facilities, so that we can achieve the target and economic development for the state in this eastern region. We hope that if we do not have these, we are unable to

raise them in the next budget, we can raise them in the Thirteenth Malaysia Plan. Mr Chairman, regarding the issue of the delay of the East Coast Rail Link (ECRL) Gemas-Johor project. This is under the same item. Mega projects are among the projects said not to be implemented this year. However, I would like an explanation from the ministry about the Gemas-Johor Project, the EDT project worth RM9.5 billion. We see that delays usually happen. So, what actually happened? Why did the delay occur? What then happened to the overall cost of the project when extension of time (EOT) was granted, were there variation orders (VO) or additions to the overall cost of the project? I hope this answer is thorough, because this is taxpayers' money, and we want- whether this people's money is saved from the delay of the project, and at the same time to provide comfort to users in the future. Then, Mr Chairman, regarding Item 020300 – Road Transport. The issue of drunk drivers. I have also raised this before, and we tried to bring this question to the MQT, but we did not get through the MQT order of business. So, I ask here so that the Honourable Minister can answer directly. The matter is: what is the ministry's action in addressing the cases of drunk drivers that are increasingly alarming day by day, to the point of taking the lives of innocent people, and what are the government's short-term and long-term plans to stop drunk driving cases? Then, Item 020100 – APAD. Regarding the demerit points of heavy vehicle drivers that we have raised, both at my own level and also with the Member of Parliament for Kuantan. This will be emphasised by the Member of Parliament for Kuantan because of engagements between the two of us with several- operators of lorry companies and lorry drivers involved. There are many complaints from them, and we strongly agree with the answer from the MOT, the Minister himself, regarding the need for a balance between protecting the safety of other road users and not being seen as being overly strict on this safety issue. However, we also need to consider the welfare of the drivers involved in earning their daily livelihood thereafter. Then, regarding the integration of the KTMB RSC under Item 00400...

Honourable, the last point, please.

Second last, please. Second last.

The last one, Honourable, it has been seven minutes, Honourable.

Alright. Regarding the RSC with- thank you, Mr Chairman. The last one, as is known. Regarding the integration of the RSC

KTMB, we have received the answer from the Honourable Minister on this merger. As I stated earlier, this merger is to ensure an improvement in the performance of KTMB, because KTMB suffers losses every year. In this answer, the Minister said the current policy of the Ministry of Transport is to fully implement the intention of the Railway Act 1991, where the RSC functions as an agency that supports the advancement of KTMB in the railway sector, and KTMB focuses on delivering efficient services to the people. So, the idea of merging these two, I certainly appeal to the Minister to look at the due diligence, with permission, whether we can carry out this merger as far as possible, because although it is enshrined in the Act, we can amend that Act. That is the task of the legislature, as we did with the dissolution or provision for the MAVCOM to be merged back with CAAM. So, I hope these basic policies can be explained by the Minister. Thank you, Mr Chairman. Assalamualaikum.

Thank you, Honourable Jerantut. Please, next, Honourable Klang.

Thank you, Dato' Pengerusi. Klang City has a population density, economic prospects and transport infrastructure needs that are increasing. I would also like to remind this august House that Port Klang is the busiest port in our country and brings very high profits. Therefore, our Ministry of Transport has a very important responsibility to ensure that all the needs of Klang city are met and its contribution is repaid in order to drive the growth of our country as a whole.

Therefore, several issues raised by the people require explanation. The first is regarding the development of Port Klang and its benefits to the surrounding community. I refer to the meaning of Supply 28 – Ministry of Transport, Item 020000 – Transport Services, sub-item 020200 – Sea Transport. In the Federal Expenditure Estimates, an estimated RM143 million is allocated as expenditure on sea transport. As I said earlier, the people of Klang have very high hopes of the Ministry of Transport to continue helping the development of Port Klang to drive economic growth in the area. The question is, will part of this RM143 million estimate be allocated to develop Port Klang, or how will this sub-item benefit economic growth at Port Klang? I would also like

to take this opportunity to remind the Ministry of Transport Malaysia about the need for infrastructure development at Port Klang to accommodate a rather busy economic cycle. The main issue faced by the community in the surrounding area is congestion. We do not want this congestion to become an obstacle to good connectivity so that the export or import of goods can be carried out efficiently. If our facilities are improved, it will attract investors because the logistics network is an important factor for industry. This matter will further increase the productivity of the port, thereby contributing taxation to the country. At the same time, the industry and employment opportunities based on cargo will also continue to grow. Improvements to logistics infrastructure at Port Klang can make Malaysia an attractive regional hub for multinational companies, especially in the manufacturing, trade and logistics sectors. This has the potential to make Malaysia the main gateway for ASEAN trade, driving sustainable economic growth and providing employment opportunities to local people. Therefore, I hope that next year the Ministry of Transport will show its commitment to improving several critical aspects such as reducing congestion, efficient traffic management and regular road maintenance, so that the potential mentioned earlier can be achieved. The community in Klang, especially entrepreneurs, expects the development of infrastructure such as wider roads, of course taking into account a better lighting system. Meanwhile, the addition of security technology such as surveillance cameras from allocations such as sub-item 020200 - Sea Transport. As the second point, Item 0200, Item 020100 - Land Public Transport Agency (APAD), under the meaning of Supply 28. The Ministry of Transport in the Federal Expenditure Estimates estimates RM13.4 million. Sub-item 00800 - Project to Rehabilitate and Strengthen the East Coast Railway Line, which allocates RM126 million. Sub-item 00900 - Enhancing KTMB Capacity, RM1.4 billion, and sub-item 20000 - Rail Infrastructure Upgrading, RM35 million. The question is, will this expenditure solve the root problem, namely traffic congestion, and ensure a smooth shift from private vehicle use to public transport among the community? What is the level of confidence of the ministry in the public transport projects currently being built? Does the ministry conduct surveys or studies as early as possible to identify the effectiveness of this expenditure at an early stage? As for Klang, as I said earlier, it is an area well known for road congestion. Will the opening of LRT3 next year reduce traffic congestion? What is the impact of the expenditure under the sub-items I listed earlier on the community in Klang?

Apart from the reduction of traffic congestion, I also hope that employment opportunities at public transport facilities such as the LRT3 Project will be opened to local residents in Klang in the coming years, so that the people can feel the returns on this investment. Dato' Pengerusi, last one.

Boleh.

The third matter I wish to raise in this august House concerns Item 01600 - Purchase of KTMB Rolling Stock, under the meaning of Supply 28. The Ministry of Transport in the Federal Expenditure Estimates estimates RM582 million. I believe this expenditure covers the procurement of 12 new KTMB passenger train carriages for passenger comfort by the Ministry of Transport. However, I also hope the ministry will explain whether the contract to produce these new train carriages will be awarded through an open tender or by direct negotiation. At the same time, I also want to ask, what is the need for our country to acquire 50 more train carriages for leasing through government cooperation with the China? The essence of both these questions is whether the government will give opportunities to local manufacturers to supply the train carriages. What is the assurance from the Ministry of Transport to ensure that the local industry benefits from this effort? I have received a letter from the Keretapi Tanah Melayu Berhad Workers' Union, which opposes the procurement of 50 train carriages from the Government of China and suggests that the ministry look for other mechanisms that do not erode the local industry and defend national assets. Personally, I support that suggestion. Thank you.

Thank you, Honourable Klang. Next, Honourable Merbok.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. I go straight to Item B.28 020300 - Road Transport, an allocation of RM714.4 million in 2025. Between January and October 2024, more than 532,125 road accidents were recorded, with 5,364 of them involving fatal accidents. With the alarming trend of motorcycle user deaths, in which around 68 per cent involve motorcycle riders and pillion riders. To curb road accidents more effectively, has the ministry studied the need to review the Road Transport Act to ensure more stringent enforcement actions? Especially in dealing with accidents involving vehicles carrying loads that are heavier than the load capacity?

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

How many operating licences of operator companies or owners of trade licences have been suspended so far because of causing road accidents? To what extent has the placement of JPJ enforcement officers at hotspots succeeded in addressing this issue? What is the latest plan of the MOT regarding the installation of high speed weigh in motion, with permission, to reduce the risk of accidents and overcome the problem of road damage caused by heavy vehicles or commercial vehicles? Next, Item B.28 020600 - Civil Aviation Authority of Malaysia (CAAM), an allocation of RM100 million in 2025. As with my colleague, the allocation for Jerantut just now. I would like to refer to the application of the Kedah State Government regarding KXP. The approval for the establishment of an aerodrome for the Kulim Cargo International Airport (KXP) from the Kedah State Government is an important element in realising the Kedah Aerotropolis Project, which is also one of the strategic components in the plan of The Greater Kedah 2035. Below are the reasons for its importance. This approval ensures that the KXP Project is in line with the vision of The Greater Kedah 2035, namely to empower Kedah as a regional economic centre, and the Kedah State Government has the mandate to integrate the development of KXP into the State Master Development Plan, including the logistics, industry and tourism sectors. KXP will also act as an air cargo hub in the north of Semenanjung and will play a major role in strengthening the Kedah economy through increased trade, export and investment activities. The approval and support from the Federal Government are the basis for the confidence of local and international investment in this project. The Kedah State Government will be responsible for the management and acquisition of land for the construction of KXP and the surrounding areas. This includes ensuring strategic land use, complying with the law and reducing social conflict with the local community. The Kedah State Government will act as a facilitator to obtain approval from federal agencies such as CAAM, MAVCOM, MOT and EPU. This project requires infrastructure support such as roads, rail, water and electricity supply and telecommunications that are under the control of the state government and also the Federal Government. During the recent winding up of the policy debate on the MADANI Budget 2025, the Honourable Minister stated that the official application for the establishment of an aerodrome from the Kedah State Government for one of the components of the Kedah Aerotropolis, namely the Kulim Cargo International Airport (KXP), had been submitted to the Ministry of Transport on 21 August 2024 last year, for evaluation for approval by the Civil Aviation Authority of Malaysia (CAAM) and the Malaysian Aviation Commission (MAVCOM), and the evaluation will be carried out within three months from that date.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Here I wish to appeal to the Civil Aviation Authority of Malaysia (CAAM) and the Malaysian Aviation Commission (MAVCOM) to please examine and

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

give due consideration to the application from my state government for approval. Without the support and approval of CAAM and MAVCOM, the planning of KXP and its components may be delayed, affecting the continuity of planning and projects to make Kedah the economic gateway of this Northern Region. The advantages of its location adjacent to the Northern Corridor Economic Region (NCER) and Kulim Hi-Tech Park (KHTP), which will have a direct impact on local residents, include creating new job opportunities and improving public facilities for the welfare of the people of Kedah in particular, and also attracting industry experts and job seekers from across the country to together seek their livelihood in this blessed state of Kedah. These people can come through the existing Lapangan Terbang Pulau Pinang. In conclusion, this approval is not merely an administrative procedure, but constitutes an official statement of support and the holistic development strategy needed to ensure KXP succeeds. But this project will also be able to strengthen its role in the national and regional economy under Kedah 2035. Thank you.

Thank you, the Honourable Member for Merbok. I invite the Honourable Member for Ipoh Timur.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, the Honourable Chairman. Mr Chairman, I would like to take the opportunity on behalf of my friend from Tenggara to welcome the presence of community leaders from Masjid Kampung Batu 4, Parlimen Tenggara, led by Tuan Haji Alauddin Yusof. Please give them a welcome. Thank you. Give them a little clap. Thank you, Chairman. We are well aware that the country can perhaps be said to be facing a crisis of shortage of skilled or trained drivers for the public transport and logistics sectors, or transport in general. I will focus on the shortage of skilled drivers. That means it is an issue and a training problem. I would like to propose overcoming and resolving, at least initially, this shortage problem, although it is a rather big challenge. We need to involve industry players, consortia, transporters and players in the public transport sector, as well as education and training institutions, especially in TVET. My friend from Tenggara is also a member of the National TVET Council, and we have heard complaints that TVET institutions, or vocational and technical training institutions,

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

are less involved in the process of developing the workforce and driver manpower required, because the industry and institutions that are closely interrelated have less of a 'tarisan' (linkage), or the connection, is a little weaker. So, I would like to propose that we adopt an industry academy approach, or AiI, where the ministry and any agencies involved may establish it together with KESUMA or any other ministries that also need to and can be involved, including using the HRD Fund, and also bringing it up to the National TVET Council. Together, of course, Tenggara will support it. To establish a wage subsidy system or training subsidy system, with permission, where the ministry and the government can pay part of the wages during the training period. That means, we take those who are interested in joining the driving or driving-related field, and the government subsidises their wages somewhat while they are trained, so that we can overcome and resolve this crisis of shortage of skilled drivers. Good. I would now like to move on to Item 00100 – Ministry Building/Administration and also 02300 – Road Transport. The nation is entering a new era in which the NETR has been announced. We are indeed working hard with various government efforts under the NETR towards the electrification of public transport, where the concession companies providing this public transport service are very, very aggressively procuring EV buses and so on. But we also hear outside that there may be an effort to adjust electricity tariffs. That means there is a possibility that the electricity tariff or rate, or cost price, may also increase. Is the ministry working together with PETRA? Earlier, the Most Honourable Minister of PETRA was present. Will PETRA together with MOT jointly work to voice the needs and voice the complaints if there are adjustments that will raise electricity tariffs, especially so that this transport and public transport sector is not affected. This is because we really want to make every effort, to work to the bone, to ensure that the NETR, especially in the aspect of electrifying public transport, can really proceed quickly and effectively, so that if there are electricity adjustments and electricity tariffs rise for EV buses for transport and public transport, if they do rise, perhaps their business plan will fail. Lastly, I refer to Item 20000 – Rail Infrastructure Enhancement. Two months ago, we heard news announced by the Honourable Minister himself that iRide or Ipoh Sentral has been shortlisted as the consortium that will develop the project. We, from Ipoh, are very, very welcoming and receptive of this project. Of course, when we say consortium, there is one big company and it will take in and attract developers,

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

small developers and smaller contractors compared to the big one to form that consortium. What is the stance, and is there any good news to be announced, meaning which consortium will win and what are the conditions for involving and admitting local contractors from Perak themselves to jointly develop Ipoh Sentral and iRide, which are very, very attractive and very, very necessary? And especially, we want to increase and expand rail or train services from north to south. Thank you.

Thank you, the Honourable Member for Ipoh Timur. I invite the Honourable Member for Setiu to speak.

Assalamualaikum warahmatullahi wabarakatuh, Dato' Yang di-Pertua. I refer to Item 030400 – Uneconomic Train Operation Subsidy (KTMB). Regarding the government's plan to charter 62 passenger train sets through direct negotiation, where the charter period reaches 30 years, this must have a very significant implication for KTMB. It is commonly known that KTMB is one of the oldest transport services established in Malaysia, now reaching 136 years. Therefore, I would like – I see that chartering 62 train sets to China gives negative implications to the people, especially regarding the issue of erosion of workers. What is the government's guarantee that throughout the charter period, the fate of KTMB workers will not be affected. Moreover, given the lifespan of the existing train sets and that their useful life will end in a few years. If they are replaced with train sets from China, how will these workers maintain the trains and control systems such as the electrification system and so on. If the train sets from China, which will certainly have all their systems and technology from China.

Second, Item 020100 – Land Public Transport Agency (APAD). Setiu finds that many weaknesses have occurred since the independent commission that regulates public transport was abolished. Before 2018, land transport was regulated by an independent commission, namely SPAD, which was free to make the best decisions to advance public services. Moreover, the bureaucratic procedures under this independent commission were much more orderly and simpler compared with being regulated by a government agency as is done in London, Transport for London (TfL), as well as in Singapore. Nevertheless, after almost five years since it was abolished, various issues have arisen. Among them, there are many backlogs in licensing public transport vehicles, causing delays in bus and taxi services, which stem from an endless cycle of paperwork. Therefore, I request justification from the ministry

on whether the earlier abolition of SPAD has had positive implications for public transport? What is the evidence, and does the government intend to use the allocated funds to establish an independent commission like SPAD to further advance public services? In the same item, I would also like to touch briefly on the government's plan to strengthen women's coaches. Women's coaches are not a new matter, and many countries have also established this service, including Japan, Egypt, Indonesia and Brazil. Previously, the women's coach programme was proven to successfully reduce cases of sexual harassment from an average of 3.2 cases a day to two cases a day. However, today we see that the strengthening of women's coaches to ensure those coaches are used only by women is increasingly weak due to weak enforcement. Therefore, with this increase in allocation, does the government intend to increase the number of these women's coaches and impose stricter enforcement to ensure women's safety is guaranteed? Next, Item 020300 – Road Transport. Regarding motor vehicle safety standards, I believe the time has come for the government to introduce a subsidy for purchasing dashcams, as there was previously a subsidy for providing car seats. Therefore, because dashcams can not only protect road users, but are also among the most important evidence if an accident occurs. However, to obtain dashcams of truly good quality, the cost is rather high. Therefore, providing subsidies, especially to the B40 community, is very much needed. In the same item, regarding MyDigital ID in the Road Transport Department (JPJ) app. Previously there was a condition that users of the JPJ app had to use MyDigital ID to log in to the JPJ app. However, the Ministry of Transport immediately cancelled that condition after receiving many reactions and complaints from the public. Therefore, I would like to raise several questions. What is the need to use MyDigital ID in the MyJPJ app if the existing system is already secure and adequate? What is the government's guarantee that the data sharing done by users is safe if MyDigital ID and a private limited company are also given the same access as the JPJ app, which is regulated by the government? Lastly, Dato' Yang di-Pertua, regarding the ECRL. I find the ECRL alignment, although the Minister in this new reply says that it has taken into account the views of agencies such as the Department of Irrigation and Drainage (JPS) when drawing up the alignment. However, I request that the ministry send representatives to look more closely, to go down to the ground, to see how complaints and grievances from grassroots residents regarding the impact of this ECRL are, including paddy crops that have been submerged and drains that have been blocked. Although the government says the construction of the ECRL has taken into account the views of agencies, what has happened is the opposite. Thank you.

Thank you, the Honourable Member for Setiu. The Honourable Member for Puncak Borneo is invited next to speak.

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Thank you, Mr Chairman. I will go straight to Item 040000 – New Policy and also Item 020100 – Land Public Transport Agency (APAD). As we are well aware, the issuance of temporary permits or LPS has been frozen by the government for all school bus operators nationwide. I feel this matter needs to be reviewed so that the ministry can give some leniency to school bus operators to apply for temporary permits for school buses to carry school pupils or members of the public on holiday trips during the school holidays. This is because what happens during the school holidays is that they have no income. So, we feel sorry for these school bus operators because when these temporary permits are no longer issued, during the school holidays it is very difficult for them to obtain new side income to support their earnings in carrying the nation's jewels, namely the children, in these school buses. So, I hope that the authorities can provide support and a re-evaluation and give these people room to be issued these temporary permits to be given to bus operators during the school holiday season. I also want to look at the problem of buses, where APAD has stipulated that every school bus must not exceed an age limit of 30 years. But we are well aware that if these buses are maintained well and pass the PUSPAKOM test or inspection, they should be given an opportunity, because these operators are mostly not big towkays. They are sometimes retired soldiers, veterans and so on, or housewives. So, we must give due consideration. Because even if a bus is three, four or five years old, if it is not maintained, that bus is also meaningless, and does not have the spare parts or wear and tear that are maintained or serviced. So, it is better that even if the bus is already 30 years old, if it is maintained well and complies with PUSPAKOM requirements, we must consider it. So, I hope that MOT will look at this matter. I also see that where school bus operators buy buses aged 20 years, this is now not permitted. But how are they to buy new buses? For a housewife, a former soldier and these bus operators to buy a school bus worth roughly RM500,000, half a million. I don't think they're able to generate that kind of money or raise that kind of fund to buy a new bus. So, MOT should facilitate, not regulate. Because if we facilitate, it becomes better. We should give opportunities. But if we over-regulate this matter, like

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

how are these people going to earn a living? Yet they are also not big businesses at all. So, we want to look at this matter. I also want to appeal to MOT, through JPJ and any agencies involved, to monitor and crack down on unlicensed van-sapu or school buses with APAD or LPKP, so that they do not snatch opportunities from registered operators, registered operators who are registered with associations and with the ministry and so on. So, enforcement must be carried out so that we do not have a bad impact on the children who use these van-sapu. If something happens, if there is an accident, what should be done? Who is responsible? But if it is with school bus operators who are registered and have full licences, they must be responsible.

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

So, MOT, I request that you refine this matter and also look at the welfare of these school bus operators, because they are not big businesses. So, we must give them room and opportunity. We should not make their lives harder and harder in this challenging world. So, I request and plead with the Minister of MOT to consider what I have put forward. Thank you.

Thank you, the Honourable Member for Puncak Borneo. Next, the Honourable Member for Padang Rengas.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you, Dato' Chairman, for the opportunity for Padang Rengas to take part in the committee stage debate on the Ministry of Transport today. Referring to B.28 Item 010200 regarding maritime management allocation of RM5.77 million. Public marinas under the Ministry of Transport, which are managed by the Malaysian Marine Department, play an important role in encouraging the tourism industry and maritime recreational activities in this country. The construction of these marinas involves large fund investments from the government with the hope of improving tourism infrastructure and providing world-class facilities to local and international visitors. My question. What is the status of the public marinas managed by the Malaysian Marine Department, such as Marina Pulau Indah, Marina Melaka and Marina Kuching? Do these facilities still receive funds from MOT for daily operations, or have they been able to bear their own operating costs after being built with such high funds?

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Dato' Pengerusi, I would next refer to B.28 Item 020200 concerning the allocation for sea transport services amounting to RM143.35 million. Due to geopolitical reasons relating to the war in Ukraine since 2022, the list of luxury yachts registered under the Langkawi International Yacht Registry (LIYR) has expanded rapidly, to the extent that the largest luxury yacht in the world that can be chartered at present is also registered under the Langkawi flag. The global luxury yacht market is currently worth about RM30 billion and is expected to rise to RM75 billion by 2032, according to Fortune Business Insights. My question. Given the very high potential of this industry, does the ministry have budgetary plans to strengthen the country's luxury yacht industry through LIYR? And do the relevant expertise and departments have sufficient manpower to help develop this industry in Malaysia?

Dato' Pengerusi, if not, has the ministry ever considered privatising the management of LIYR registration to ensure the development of this industry reaches a higher level in line with its potential?

Meanwhile, I would like to touch on human capital development. As mentioned earlier by the KESUMA Minister, the maritime career is one of the high impact, high value careers. Therefore, what steps or plans does the ministry have to strengthen the professional workforce of this luxury yacht industry so that high-income job opportunities that can be explored by local youth are provided?

Dato' Pengerusi, next under the same Item, I would like to touch on the aero-marine industry, which is a new alternative, has high potential and uses alternative fuel engine systems with less impact on the environment, such as hydrogen cells or electric power. Competition for this industry is currently not large, and existing technology has the potential to position Malaysia as the premier aero-marine hub in the region. For information also, 40 per cent of the world's population lives in areas near the coast, coastal areas. My question. In line with the possible investments that will come into the country for the hybrid aero-marine industry, which is regulated by MOT through guidelines provided by the International Maritime Organization (IMO), has the ministry been prepared in terms of legislation or technical operational requirements, as well as skilled professional manpower for this high-potential industry?

Next, I would like to touch on the undersea tunnel project in Penang. I request details on the status of the feasibility study for this project, which is still incomplete. When can this process be finalised?

Regarding the Perlis Inland Port, what detailed plans does the government have to ensure the continuity of the PIP project in Chuping, which is expected to be completed in July next

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

year, as well as the efforts taken to launch the process of transferring cargo operations currently carried out in Padang Besar?

Finally, what action will MOT take regarding the report that the Penang Ferry service suffers an annual loss of around RM14 million due to operating costs exceeding the ferry ticket collections?

Thank you, Dato' Pengerusi.

Thank you, Honourable Padang Rengas. Next, I invite the Honourable Sri Gading.

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Dato' Pengerusi. Item 12100 – Land Transport Projects, P.28. The additional allocation from RM70.2 million to RM182.35 million for land transport projects reflects the government's commitment to improving the nation's infrastructure. The southward extension of the West Coast Expressway (WCE), from Banting to Gelang Patah, is a strategic step that will connect major towns in Negeri Sembilan, Melaka and Johor such as Port Dickson, Masjid Tanah, Bandaraya Melaka, Muar, Batu Pahat, Pontian and Gelang Patah itself. This project will bring positive impacts to the people. Therefore, here are several proposals from Sri Gading. Firstly, the economic empowerment of local communities, where the areas along this alignment are developing areas that need rest and rehabilitation areas, giving priority to local entrepreneurs. In this way, they can provide employment opportunities to the people. Secondly, public transport integration. This WCE extension also needs to be integrated with public transport networks such as express buses in particular, because many residents of this alignment work in the big cities. This will ensure that people who do not own private vehicles also benefit from this expressway. Besides that, one issue that is increasingly worrying under the land transport sector is the glut of vehicles which, according to a 2022 report, there are more than seven million old vehicles in our country. This glut not only burdens road infrastructure but also contributes to pollution and increases the risk on the roads. Taking the example of Singapore. After 10 years, vehicle owners are required to either end the vehicle's life or pay a sum of money to extend its ownership and use. This policy ensures that vehicles used on the roads are good, efficient, modern and environmentally friendly. The second example is Japan. Owners must undergo a vehicle safety inspection every three years after purchasing the vehicle.

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

Vehicles older than 10 years must undergo strict inspections to ensure safety and to prevent a glut of vehicles.

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

The proposals for improvement are as follows. The first is a vehicle scrappage policy. The government may introduce a system or incentive scheme for owners of old vehicles to end the use of their obsolete vehicles, such as offering subsidies for the purchase of new vehicles or exemption from certain taxes. Second, enhanced safety inspections. As in Japan, more stringent periodic safety inspections should be made mandatory for vehicles aged more than 10 years. In addition, Sri Gading commends the MyLesen B2 Programme by the Ministry of Transport together with the Road Transport Department, which in 2024 benefited 35,000 B40 recipients in obtaining a Class B2 Driving Licence at a lower cost. Sri Gading would like to ask whether the government plans to continue this programme in 2025? Item 020600 – Civil Aviation Authority of Malaysia (CAAM). The reduction of the allocation to the Civil Aviation Authority of Malaysia from RM150 million to RM100 million raises an important question about this body's ability to continue providing high-quality services, especially when we are facing critical issues in the aviation sector, where we are witnessing travel disruptions at airports that have drawn much attention. With this reduction in allocation, how will the government ensure that CAAM can continue to carry out its main functions, including aviation safety oversight, so that it can function and at the same time facilitate the country's tourism activities? Furthermore, Malaysia will be the Visit Malaysia Year in 2026, in which the aviation sector will be the backbone supporting the target of tourist arrivals. The government needs to plan several improvement measures that must be taken. First, airport infrastructure and traffic management. Second, local workers in the aviation industry. Lastly, 40000 – Upgrading and Development of Traffic Control/Management Systems. Sri Gading welcomes the significant increase in allocation from RM9.6 million to RM228.3 million for upgrading and developing traffic control and management systems. This change shows the government's commitment to tackling the increasingly serious traffic congestion problem, especially in urban areas. The key question is, does this allocation involve the installation of smart traffic lights or a smart traffic system? Such a system is able to coordinate traffic control based on real-time data, reduce congestion and improve travel efficiency. However, this system requires the continuous integration of technologies such as sensors, smart cameras and data analytics. Is the government ready in terms of infrastructure and technical support for nationwide implementation?

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

Finally, public awareness campaigns need to involve the promotion of public transport as the first choice, including incentives such as low fares and additional facilities on bus and rail systems. Engagement with private companies so that the government can work with companies that introduce flexible working hours to reduce congestion during peak hours. In addition, companies may also offer public transport fare subsidies to their employees as a corporate incentive. Cooperation with technology platforms. The government may establish cooperation with companies such as Grab or e-hailing services to coordinate travel with public transport. Thank you.

Thank you, Honourable Sri Gading. I invite the Honourable Kuala Krai.

Bismillahi Rahmani Rahim. Thank you, Honourable Mr Chairman, for giving Kuala Krai the opportunity to take part in the debate at the Committee stage of the Ministry of Transport. Honourable Mr Chairman, I take this opportunity to state here that today, Kelantan is being hit by massive floods, which can be said to cover all of Kelantan including Kuala Krai. Let us all pray to Allah that everyone affected by these floods will be saved. [Reciting a prayer] "O Allah, may the rain that falls be a rain of mercy and not a rain that brings calamity."

Dato' Pengerusi, the budget received by MOT for 2025 has risen by about RM60 million compared with this year. I would like to refer to several items. The first is Item 020200 – Sea Transport. Chairman, I would like to mention Tok Bali Port in Pasir Puteh. With the ECRL project currently under way and Tok Bali becoming the second station in Kelantan, the first being in Tunjong. The second in Kelantan, at Tok Bali. What efforts does the ministry make to ensure that Tok Bali Port can be developed properly? I am confident that if the MOT can look at this holistically and also help, particularly by providing capital injection with careful planning together with the Kelantan State Government, Tok Bali will become the greatest sea and land transport hub in the state that borders Thailand.

In connection with the floods just now, there are reports from residents that the ECRL project is the cause of severe flooding, especially in the Pasir Puteh area, namely in the village of Banggol Pak Esah. So I hope the Honourable Minister can go down to the ground to look at this issue and make a detailed report.

Secondly, Mr Chairman, Item 020300 – Land Transport. On the issue of road accidents, especially fatal accidents that we hear about almost every day

Previously, I proposed that religious elements be included in the syllabus of the Driving Education Curriculum Course. Whether Islam or other religions that may be included based on the religion professed by the participants. For example, the value of human life when involved in accidents caused by the negligence of drivers that results in the death of innocent people. Heavy penalties will be imposed, whether by diyat payment or punishment in the civil courts. So, is the ministry prepared to study this proposal? In connection with the same item, the diesel subsidy quota for buses. Is the government prepared to consider the proposal that the diesel subsidy quota for express buses be increased to 10,000 litres a month compared with 6,000 litres previously, so as to prevent consumers from being burdened by fare increases, as urged by the Malay Peninsula Express Bus Operators Association (PEMBAWA). The third point in the same item concerns driving licences and Class B licences. What improvement efforts does the ministry have in terms of coordinating the system and implementation conditions of the special transition programme for holders of Class B1 and B2 licences to Class B since 1 October, taking into account complaints received regarding registration and eligibility status? How many applications have been received and approved so far? Of this number, how many applications have been rejected for not meeting the requirements for licence upgrading? Details of the government's plan to offer options for those who wish to print road tax and driving licences physically as before. I propose that the government simply revert to the old way, that is, just pay for the road tax and driving licence and directly get the printed document. The people have already borne too many burdens, Dato' Pengerusi, the costs of rising cost of living and other taxes. The next item is Item 12100 – New Office/Building, Equipment and Computerisation for JPJ. With a large allocation from RM70 million to RM182 million for this item, I propose that the ministry approve the opening of a JPJ office in Kuala Krai, since the nearest JPJ office is in Machang, but a long waiting time is needed to complete transactions. Although in Gua Musang, customers are not very many, the travelling distance is nearly two hours from Kuala Krai. So, it is very suitable and an urgent need for JPJ to open its office in Kuala Krai, rather than merely having mobile counters. The next item is the second-to-last, Mr Chairman, namely Item 00800 – Project to Rehabilitate and Strengthen the East Coast Railway Line, from RM51 million to RM126 million. This increase is expected to ensure the route from Tumpat to Gemas via Kuala Krai can be repaired immediately to shorten travel time, especially for DMU trains that have been operating for several years. Among the major issues that need attention from MOT are the slippery tracks and old bridges, some of which are more than 100 years old and need to be rehabilitated immediately.

Interestingly, the Kuala Krai–Gua Musang route, which you, Honourable Mr Chairman, once travelled by the train to Dabong, has eight tunnels, or as Kelantanese people call them, Bukit Korek, and another one in Pahang. These tunnels also need to be repaired immediately because all these are among the reasons why the speed of the DMU cannot be fully utilised.

Last item, just one minute, Honourable Mr Chairman. Item 00900 – Enhancing KTMB's Capacity and Item 20000 – Rail Infrastructure Improvement. I have several questions here. First, why did the delay occur? [Deputy Speaker (Puan Alice Lau Kiong Yieng) took the Chair] The Gemas–JB Route Project. How many EOTs have been granted? Is there an integrity issue in the implementation of this project? Second, RAC is more profitable and wealthier than KTMB. Why not simply merge these two entities? Third, is it true that the CEO of RAC was appointed not according to expertise but on a political basis? Fourth, what about the leasing of trains from China, which have been reported to be of poor quality? Indonesia restarted China-made trains because they failed to operate without a driver. Fifth, by handing over the 30-year leasing period, will there be a transfer of technology to workers in this country, especially TNB workers? Because based on track record, the sets that are readily purchased through CSSR China, no technology transfer has been carried out, and even if it existed, it was merely high-production showmanship. Thank you, Honourable Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up. Thank you. Thank you, Honourable Kuala Krai. I invite the Honourable Langkawi.

Thank you, Dato' Pengerusi. Assalamualaikum warahmatullahi wabarakatuh, greetings to the Honourable Minister. Item 020600 – Civil Aviation Authority of Malaysia (CAAM). RM100 million will be given to CAAM next year. We understand that CAAM will merge with MAVCOM and this year it was given RM150 million. My question, why is it RM50 million less? When in fact MAVCOM and the Civil Aviation Authority of Malaysia (CAAM) have already been combined. The second question, Dato' Pengerusi, relates to the construction and upgrading of airport infrastructure amounting to RM74 million. I bring the attention of this House to Subang Airport, which has become the talk of the people, especially around Kuala Lumpur, when the Honourable Minister brought in an MRO company from Singapore that leased two hangars at Subang. What is the long-term plan

The Honourable Member, in relation to this site? Will the players around Subang Airport be called to discuss whether to upgrade it or to allow commercial buildings in the area? I also want to touch on Langkawi Airport, Dato' Chairman. If we look at it, Honourable Chairman, out of that RM74 million, I also want to ask: how many millions will be given to Langkawi Airport? It is not that it is poor, but sometimes it is rather troublesome for tourists. I once arrived in Langkawi and had to sit in the aeroplane for longer than the flight time from Kuala Lumpur to Langkawi because of rain, lightning and storm. We could not get out because there was no bridge - there was no jambatan from the aeroplane to the airport. This creates a problem. At the very least, it should be made like Subang, where there is also a covered walkway. All these aeroplanes provide umbrellas. Wet below, dry above. As soon as we reach the terminal after an hour in the aeroplane, people head straight to the toilet. Well, an hour in the aeroplane, then the toilet too. I also want to complain a little about the toilets there. Not that they are unkempt. They are maintained, but rather old, and they smell in a way we would not want. Next, Honourable Member, I want to touch on Item 020200 - Sea Transport. Item 020200 concerns the Langkawi Island ferry and also the Penang Island ferry. The Penang ferry, as I recall, has always made a profit, but RM14 million in losses was announced, and there were not enough passengers. It is said that only 35 percent of passengers take the ferry in Penang. Although it was changed from the old, quaint ferries, which also became a tourist attraction, to the new ferries, unfortunately, even with these two ferries, it has not received such returns. The same goes for the Langkawi Ferry. I think the Honourable Minister is also reluctant to hear about the Langkawi Ferry matter; the story is the same. However, I want to ask the Honourable Minister: is there no company willing to operate a water taxi, which we have been talking about all this time, with a capacity below 50, 20-30 passengers, that can go directly? If we look at Phi Phi Island to Midland, Thailand, they use these boat taxis, these ferries, and passengers do not have to wait long, and it also shuttles back and forth very quickly. Finally, I want to touch briefly on this MIROS laboratory. Item 14000 - MIROS Laboratory Development Project, RM15 million, Honourable Minister. This is a rather large sum for one laboratory. I want to ask about the KPIs and performance of MIROS all this time, for the 17 years of its existence. Year after year we witness road accidents. What new innovations have been introduced by MIROS, Honourable Minister? Basic infrastructure such as road dividers is still stuck in the old ways. Does the government plan to replace road dividers with new designed materials? Existing road dividers can and have caused death to road users. In 2018, a motorcyclist's head was severed when his neck was struck by a road divider metal barrier.

was struck by a road divider metal barrier. Accidents involving drunk drivers and also the negligence of lorry trailers are frequently reported, and recently a trailer whose head was severed was also reported. Year after year we hear tragic stories without any decisive solution. So, I want to ask: does the Honourable Minister give new instructions to MIROS so that we conduct deeper work with the existing studies?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, time is up.

The last item, Dato' Chairman, 00900 - Enhancing KTMB's Capacity. RM1.4 billion under this 00900. KTMB users frequently complain - KTMB users frequently complain about delays and sometimes the frequency of KTMB trains. I want to know, what steps is the government taking to resolve this problem? Many of our friends, especially in Pendang, take the train, I can say every week back to the constituency.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Langkawi. Now I invite the Honourable Member for Petaling Jaya.

How could you, Mr Speaker. [Laughter]

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you to Madam Chairman. Before I begin, I want to welcome the students from the Department of Social Administration and Justice, University of Malaya. Madam Chairman, the urbanisation rate in Malaysia shows an increasing trend that is expected to reach 80 percent in the near future. I want to cite transit oriented development codes, coupled with the fact that Malaysians who own private vehicles are expected to keep increasing by 2030. The nation should focus on policies that optimise land use and encourage a shift from private vehicle users to public transport, such as transit oriented development centred on public rail or bus transport stations and having high connectivity to public transport, pedestrian lanes and cycling lanes. In Japan, high-density areas, also known as high-density areas, can be fully accessed on foot or by bus. In TOD zones, the MRT system can reach destinations for recreational activities, residential apartments and shopping centres. It cannot be denied that TOD projects around the Klang Valley, including in Petaling Jaya, have already been developed, and moreover the areas around these transit hubs are luxury and exclusive condominiums, with some units sold at prices of up to RM700 thousand per unit.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

This raises the narrative that the accessibility of public transport is only focused on middle or high income groups, thereby creating an exclusive environment. Madam Chairman, I take note that TOD is not a new concept. However, my question is how the ministry will ensure that TOD projects are more inclusive and affordable so that there is no income-based accessibility gap. Second, does the ministry have plans to update guidelines in line with current trends? On e-hailing, Madam Chairman, we are well aware that to overcome the first and last mile (FMLM) issue, various methods have been adopted. However, the continuous complaints of users show that public transport access across Malaysia still lags behind. Madam Chairman, I would like to propose that, to allow e-hailing companies to fill the existing gaps, passenger e-hailing motorcycle services be established alongside continuing to support strengthening FMLM in this country. According to the International Transport Federation report, cities such as Bangkok and Jakarta can improve consumer welfare, with permission, and strengthen the resilience of the nation's public transport through the implementation of motorcycle e-hailing. Furthermore, the gig economy spanning various e-hailing and p-hailing industries is growing in Malaysia. It opens up opportunities for the e-hailing concept as a dual income generating the people's economy. However, I understand the ministry's concern about road safety. In fact, the efficiency of motorcycle e-hailing has been proven in neighbouring countries such as Thailand and Indonesia, where passenger e-hailing frequency is more than five times a week compared with car e-hailing, which is only three times a week, because it is easier and saves waiting time in congested traffic. Grab has a low road accident rate in the region. This is the result of transport regulations under the land transport authority and quality of services, with permission, as a benchmark for rider safety. Then, it is integrated into the Grab application with notification features such as journey monitoring alerts, driving safety reports, and reminders to rest to prevent accidents from occurring. In Jakarta, the motorcycle e-hailing service Gojek implemented the Gojek SHIELD initiative, which covers protection from cyber attacks, personal data protection, and is able to prevent and take action against suspicious activities on the Gojek application. Based on the examples above, my question is how the ministry views the development of the public transport industry in the context of global motorcycle e-hailing trends? Second, is the ministry ready to consider motorcycle e-hailing services? In Petaling Jaya, if we

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

want to carry out a sandbox, I suggest it first be held in Petaling Jaya, and I am ready to support initiatives to establish motorcycle e-hailing. Third, briefly, for the reason already mentioned by Langkawi, namely the KTMB commuters. For your information, it is not only Pendang that frequently takes the KTM. Petaling Jaya also has frequent KTM delays, with a frequency that is only every 30 minutes at peak hours, and delays sometimes up to 60 minutes. I understand the government has acquired 62 new train sets through leasing, which will run for a period of 30 years. I want to know whether the ministry has provided details for the implementation of these trains, and with the addition of the number of these trains, will the frequency of ETS and KTM services be improved? That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Petaling Jaya. I invite the Honourable Member for Kuantan.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Thank you, Mr Chairman. I go straight to Item 010700. The media reported on the proposal to use MyDigital ID to log in to the MyJPJ application. The MyJPJ application itself requires personal registration. So, what is the need to add MyDigital ID for login? Why complicate users with MyDigital ID? I see this proposal as impractical, especially involving senior citizens. The implementation method of this login will certainly burden them and is not user-friendly with the latest technology. Has the ministry conducted a survey to obtain feedback from users? I want to ask whether data related to the JPJ system will be stored in the IDN database? What are the data security risks in the integration of this proposal? Many citizens have responded with their anxiety about this matter. I seek clarification from the Honourable Minister on this matter. Item 020000 – Transport Services. I also want to touch briefly on the ECRL. So, my question is, what energy source will be used for ECRL operations? Will it use fuel or electricity? Has the ministry taken into account the government's aspiration regarding the net zero carbon emission target by 2050 for the ECRL project? The ECRL project is expected to be completed in 2026 and start operating in 2027. So, my question is, what is the level of preparedness for matters related to services, including the provision of spare parts? What percentage of critical components or equipment require a long period to obtain? Previous reports stated that local companies are also involved in the ECRL project. The question is, to what extent will local companies be involved in service and maintenance for the ECRL project? Several states will implement the service

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

automated rapid transit, namely Sarawak and Johor. My question is, have guidelines been issued by the MOT (Ministry of Transport) in the implementation of ART development so that it is consistent across all states? What is the impact of using ART in alleviating traffic congestion in urban areas? Referring to media reports, the Indonesian Government will return the ERT trains that failed to function autonomously during trials in the capital city of Nusantara last September. In addition, the braking system failed to function automatically when there was an obstacle in front of the train. My question is, have studies on safety aspects and accident risks been carried out for the ART projects in Johor and Sarawak? On the same item, I want to obtain an explanation regarding the Gombak Integrated Terminal. Media reports quoted the statement of the Minister of Transport that this terminal was expected to begin operations in the middle of this year. However, until now it has not yet begun operating. What factors have caused this terminal to be unable to function, and when is it expected to start operating? Referring to Item 020700 – Malaysian Institute of Road Safety Research (MIROS). What forms of study have been carried out by MIROS to overcome road traffic congestion occurring on highways and federal roads? What are the findings of studies related to road accidents, and proposals to overcome road accident factors? The weather in our country is equatorial, and roads are easily damaged and cracked. So, I read the report of a pilot project mixing asphalt with plastic or rubber waste that was implemented in Temerloh in September 2017 and Kemaman in 2018. My question is, to what extent are the findings of that study? What is the cost analysis of construction using this mixed material compared with maintenance costs? Many accident cases involve motorcyclists who stop on the road shoulder under bridges during heavy rain, especially in urban areas. What actions have been taken to raise the alertness of road users, especially at accident hot spots? How many sheltered areas are available to motorcyclists in urban areas? I propose that more rain shelters be built, especially in big cities with many motorcycle users. Finally, Item 020100 – Land Public Transport Agency. Last year, I raised the matter of demerit points for heavy vehicle drivers within the road safety system. When demerit points are deducted and the driving licence is eventually suspended, this situation makes it difficult for drivers because they cannot drive any vehicle, even their own vehicles, cars or motorcycles. If this matter can be considered, only commercial-related licences would be affected, but individual licences could still be used. The Honourable Minister has responded to this matter in the previous session. I quote the Minister's answer: "In terms of enforcement, perhaps we need to look again

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

at more practical enforcement methods that can also give them room to earn a living." However, until today, no resolution or improvement action has been taken on this matter. So, as the Jerantut Member mentioned just now, they came. These lorry drivers came to meet me and asked. They met us and asked about the room for resolution that the Honourable Minister had announced. So, just imagine if an accident happens while they are driving to work, or taking children to school, or going to buy food. So, what is the government's responsibility arising from this regulation? So, I seek a response from the Minister. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Kuantan. I invite the Honourable Member for Bangi.

Thank you, Madam Chairman. This is the second time I have stood up today. Today there are three ministries, God willing I will debate all three ministries. I have to say that because my Secretary-General is there. So, I begin with congratulations to the ministry on the increase in allocation in the 2025 Budget, namely RM6.5 billion for next year compared with RM6.2 billion for this year. This shows the government's commitment to strengthening an integrated, efficient and also safe transport system. I now refer to code 020300 – Road Transport. Here, I want to touch on several accident incidents involving heavy vehicles, specifically container lorries and trailers. These incidents have, sadly, resulted in the loss of innocent lives. I want to know what steps have been taken by the ministry through the Road Transport Department (JPJ) to ensure that heavy vehicles such as lorries and trailers do not endanger other road users. I also want to know what action has been taken against companies that own heavy vehicles involved in accidents like this? I am aware that operating permits can be suspended and this is often done. But I want to propose that prosecution also be taken against the owners of heavy vehicle companies if there is negligence on the part of the company. For example, if they fail to ensure the safety of heavy vehicles driven by their drivers, then my proposal is not only to take action against the driver, but if there is negligence, also to prosecute the employer or company. If the law needs to be amended, I hope the ministry can consider this matter.

Next, I refer to Code 20000 under the Development Head, namely Rail Infrastructure Enhancement. For the information of the House, many residents in my Parliamentary constituency, Bangi, especially in Bandar Baru Bangi, work in Putrajaya. I often receive requests from Bangi residents that the MRT, which currently terminates at Kajang, be extended to Bandar Baru Bangi. At present, there is a Route 451 bus service from MRT Kajang through Bangi to MRT Putrajaya Sentral, and this route is still on trial. Recently, the trial period was extended to 30 March 2025. I understand that a study was carried out by the ministry on how to connect Bangi and Kajang, both of which are in my Parliamentary constituency, with Putrajaya. So, I would like to know the conclusions of that study. If we look at it, there is indeed a need to connect Bangi-Kajang with Putrajaya and Cyberjaya using public transport, especially through the use of rail. I also want to know whether, in the RMKe-13, there are plans to connect MRT Kajang with MRT Putrajaya Sentral by rail. I now refer to Code 020100 – Land Public Transport Agency (APAD). I note that for APAD there is a reduction this year, namely RM13.4 million compared with RM14.2 million for this year. So, next year there is a reduction from RM14.2 million to RM13.4 million. I would like to refer to a recent incident, Madam Chairman, where a teenager died from an electric shock after using a socket in an express bus. I understand that APAD has temporarily suspended the use of these electric sockets. I would like to know what steps the ministry has taken to ensure that such incidents do not happen again. Because I think there is a need not only to review the wiring in express buses and the like, but also in other vehicles such as trains, trams, ferries and so on, and periodic checks must be carried out to ensure that the wiring and cabling in all these vehicles are safe, so that such a heart-rending incident does not happen again. So, that is all I wish to raise, Madam Chairman. Once again, Bangi seeks your support. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Bangi. I invite the Honourable Rompin.

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you, Madam Chairman. I do not think I will take up a long time because I will

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

touch on only one item and two matters, namely Item 020200, the allocation for Sea Transport. Firstly, I would like to express my thanks to the Honourable Deputy Minister. In May this year, he visited Pulau Tioman and personally went to Jeti Kampung Juara. He saw for himself the upgrading works at Jeti Kampung Juara on Pulau Tioman. I hope that this jetty can be completed within the stipulated time frame, God willing, and that it can be used and attract many more tourists to come to Pulau Tioman. What I want to raise, Honourable Minister, concerns the many complaints I have received from tourists, namely that the ticket price to Pulau Tioman is expensive, Madam Chairman. Return fare is RM120, and this is caused by the ferry operators on Pulau Tioman not receiving diesel subsidies as enjoyed by ferry operators in Langkawi and also on the islands in Sabah. So, when tickets are expensive, some tourists are forced to cancel their holidays on Pulau Tioman, and this certainly puts pressure on the traders on Pulau Tioman. Pulau Tioman, Madam Chairman, relies only on tourism activities. Tourists come and this brings returns to them. So, I hope the Honourable Minister will ensure that ferry operators on Pulau Tioman can also enjoy the subsidy I mentioned earlier. The second matter, Honourable Minister, concerns the complaints I have also received regarding Marine Department boats that use the Tanjung Gemuk Jetty terminal to berth. This causes difficulties for ferry operators in moving passengers onto the ferries to Pulau Tioman. So, I hope that a new berth will be provided for the Marine Department boats. So, I think that is all from Rompin, I...

Ya.

Can I have a little more time?

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Yes, yes, please go ahead.

What is Rompin's view on the Ministry of Transport's earlier proposal to conduct a pilot test on micromobility vehicles? Last year I asked a question in this House, and it was answered by the Deputy Minister that a pilot test would be conducted in Shah Alam. We want to know the results, because micromobility vehicles are now being used by road users, pedestrians and commercial operators in recreational parks. For example, in Alor Setar, we previously received complaints that people wanted to use them but were prevented because the law does not allow it. So, this is an opportunity to attract tourists and also to reduce carbon emissions in the city. What is the Honourable Rompin's view?

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Thank you, Alor Setar. I agree with the view expressed by Alor Setar and I request that it be included.

Rompin. May I ask you a question, Rompin?

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

So many people want to ask me questions.

You have 48 seconds left.

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Okay. Yes, yes, please go ahead.

The LRT issue in Penang, Rompin, because we know that the LRT in Kuala Lumpur itself still does not generate profit, following reports from Khazanah, Prasarana and so on.

So, when it is proposed to build an LRT in Penang, is there a possibility that it will become a white elephant project given the projected ridership in Penang? We ask that the Minister give justification as to why this project is to be implemented in Penang with an estimated expenditure of more than ten billion. Thank you, Rompin.

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Thank you, Pasir Mas, and I also request that this be included in my speech. Thank you very much for helping me this afternoon. Thank you, Madam Chairman. I am keeping to time.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Rompin. I invite the Honourable Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Madam Chairman. I would like to move on to Head B.28 – Ministry of Transport, Item 60000 – Urban Public Transport. First of all, let me answer Pasir Mas first, lah. The LRT in Penang is indeed necessary, okay. A study has been done since 2012 and the need is already there. If Pasir Mas is not satisfied, come to Bayan Baru. I will show you how severe the congestion is in one...

I am asking the Minister, Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Be patient first. I invite...

I told the Minister to answer. [Laughter]

Tuan Sim Tze TzinPKR · PHBayan BaruEN

We can play badminton. Eat nasi kandar, okay. Thank you. The Minister does not need to answer. I will answer first. [Laughter] Okay. On the LRT issue in Penang, I welcome this project and it is indeed an important project for Penang's infrastructure. We know that the state of Penang is small and its road congestion is very severe. Even though there is no LRT yet, the congestion is already very severe.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

When there is an LRT, when the LRT project is being built, the roads become even narrower. Previously, if a car could travel at 60 kilometres per hour, when there is construction, it will become slower and even slower still. Perhaps it will only be 40 kilometres per hour, 30 kilometres per hour, and it will make the congestion even worse. So, there needs to be – I would like to draw attention to MRT, the LRT Pulau Pinang implementing agency project. It requires forward planning. What kind of forward planning? It means that it must solve the road congestion problem during construction. Even though project management will say, "Oh, we have traffic control, a traffic management system, all that is not enough". So, I would like to propose here to the government, especially MRT, that we must have a more holistic approach. We ask the government to implement demand responsive transit (DRT) using small buses from Prasarana and so on to solve local congestion during construction. If possible, the government should give temporary licences to factory bus operators and school bus operators so that they can operate locally as demand responsive transit, and these licences are used to solve the congestion problem during construction. I think there needs to be forward planning from MRT together with the Local Authority (PBT) and also the state government. Secondly, I would like to debate Item 020700 – Malaysian Institute of Road Safety Research (MIROS). MIROS, I know it is a research body. I would like to propose to the government because we know that road safety is now a very worrying issue, because if we look everywhere, motorcycle riders, they run the traffic light just like that. I recently, in Bayan Baru, saw a primary school pupil crossing the road. The pedestrian indeed had the green light. All cars and motorcycles should have stopped to give way. But what happened was that the motorcycle simply hit him, okay. The schoolchild did not see it and was knocked down. I am not sure whether he survived or not, but the video has already gone viral. I feel sorry for the schoolchildren. This is a road safety issue that is out of control. If we Honourable Members here go anywhere, you just sit near a traffic light. You will see there are certainly traffic violations and many people become victims. What are we going to do about it? We ask the police, and the police say they do not have enough staff. We ask the Road Transport Department (JPJ), and JPJ also says, "This is the police's job". We ask others, and they keep passing the ball here and there. Who will solve this problem? In fact, many have already become victims.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila gulung.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

So, I hope the government will seriously take this to the Cabinet to discuss road safety, especially running red lights. Thank you, Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Bayan Baru. I invite the Honourable Padang Besar.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you to Madam Chairman for giving the space and opportunity for me to debate today at the Committee stage regarding the Ministry of Transport. Firstly, I pray that our new border agency, the Malaysia Border Control and Protection Agency (MCBA), which will be implemented next year, will be made easier, God willing. However, the Ministry of Transport is involved as a component in MCBA. I am only slightly confused by the abbreviation MCBA. On the MINDEF portal, it is written as Malaysian Checkpoints and Border Agency, but on the Ministry of Home Affairs (KDN) portal, it is written as Malaysian Border Control and Protection Agency. These are among the things that are a bit confusing. Perhaps it can be agreed upon. Thank you to the Honourable Padang Rengas who raised the matter of the PIP project in Cuping, Perlis. That deserves attention in order to facilitate logistics transactions between borders under Item 020200 – Sea Management. I wanted to mention it but Padang Rengas already did. So, I will focus on other items. The next item is 020300 – Vehicle Entry Permit (VEP) related to implementation at the border. Firstly, I would like to congratulate the ministry on the implementation of the LCVEP Road Charge and Vehicle Entry Permit, especially in the context of the operations that began on 1 October at the Malaysia-Singapore border. The full implementation challenges are expected to begin next January. I would like to elaborate a little on the situation at the Padang Besar border and its importance for security and the tourism sector in the state of Perlis. In Padang Besar, this situation is very relevant. Foreign vehicles from Thailand that have outstanding summonses also have the potential to have a negative impact on our road safety. Also, the issue of sweeping pre-bets that affects taxi operators at the border. I also propose that a monitoring system and a blacklist for foreign vehicles be enforced immediately, even before January, to prevent such vehicles from flooding our border. Next, regarding the determination of VEP charge rates and maintenance costs. The matter of VEP charge rates and maintenance costs needs to be explained more transparently. What criteria are used to set these charge rates? Do these rates take into account the maintenance costs of the VEP system, such as at the Padang Besar entry point? In addition, the total allocation for VEP operations and maintenance at the border needs to be given attention. In Perlis, sufficient resources need to be channelled to

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

ensure that this system functions efficiently, including the installation of related infrastructure such as registration kiosks, digital monitoring and technical support. Madam Chairman, the issue of standardising VEP rules at all entry points across the country also needs serious attention. At present, the government's plan begins at the Malaysia-Singapore border. However, what concrete steps have been planned to expand this implementation to the Malaysia-Thailand and Malaysia-Indonesia borders? Padang Besar, which is one of the main entry points into Malaysia from Thailand, differences in rules and procedures with other borders may cause confusion for tourists. This standardisation is necessary to avoid the perception that enforcement is only selective at certain entry points. The implications for the tourism sector and the economy of Perlis. The tourism sector in Padang Besar is an attraction for foreign tourists, especially from Thailand, which must be protected from any negative feedback arising from weaknesses in the VEP implementation. Inconsistent enforcement or burdensome procedures may affect the entry of tourists. Among those most affected are social businesses and small businesses at the border who frequently commute between the two countries to conduct their dealings.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

These are indeed the ones who energise the border economy. Slow processes will affect them and impact other users, especially tourists, who will have a bad experience. This includes the issue of extraordinary inspections at the ICQS Padang Besar entry point all this time. With orderly and transparent implementation, the VEP system can provide an opportunity to strengthen Perlis's image as a safe and visitor-friendly tourist destination. Item 00900 – Enhancing KTMB's Capacity. Coincidentally, most of us from the north use the ETS system a lot, and the same issue was raised previously, the issue of late arrivals. Please pay attention and the addition of coaches is needed for these issues. I myself sometimes have to book even earlier to get the ETS service. I hope the Honourable Minister will give attention to this, and thank you for the earlier information that the Honourable Minister will take note of several matters in Padang Besar. Next, and finally, I move on to Item 01600 – Purchase of KTMB Rolling Stock. In Budget 2025, it was stated that the government had agreed to obtain 50 train carriages on lease through G2G cooperation between Malaysia and China at a cost of up to RM10.7 billion over 30 years. However, I see the ministry's answer to the oral question from Jerantut recently, on 14 November 2024, the MOT said that the details of the expenditure involved had not been finalised because negotiations were still ongoing. After looking at the review regarding Chinese-made railway from Indonesia, we are even more worried about the condition of the train carriages that we will get through this leasing method. It is true that our trains are not autonomous like Indonesia's, but

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

worried. This is a newspaper clipping from Berita Harian dated November 15, 2024, "Indonesia pulangkan kereta api buatan China kerana gagal beroperasi tanpa pemandu." So my question is, why did the government decide to take the leasing approach and not a phased purchase? Why lease from China when KTMB has collaborated and shared expertise with Japan since 2019?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

I have discussed with Datuk Rizal Abduh Haji Saleh that we are capable of making our own trains. He is also an experienced person in the transport industry in Malaysia. Also, the voice of the Railwayman Union of Malaya (Kesatuan Pekerja-pekerja Keretapi Tanah Melayu Berhad) cannot be ignored. That is all, I conclude with wabillahitaufiq walhidayah wassalamualaikum warahmatullahi wabarakatuh. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Padang Besar. I invite the Honourable Miri.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you, Madam Chairman. I would like to refer to Item 13000 – Construction and Upgrading of Airport Infrastructure. I would like to express my heartfelt thanks to the Most Honourable Member for Tambun and also to the Honourable Minister for the approval to upgrade Miri Airport given in Budget 2025. I would also like to refer to Item 040200 – Airfare Subsidy. I also want to extend congratulations and commendation for the efforts of the Ministry of Transport in always being committed to helping make air tickets more affordable. However, we still face challenges, where sometimes air tickets are still very high and unaffordable for the rakyat, especially when they have matters such as education, health and others, apart from travelling for holidays. If it is for travel, they can book tickets early and perhaps enjoy lower costs, but usually when we have urgent matters, which require booking tickets within two weeks, the price will soar. I understand this is due to the pricing mechanism of airlines, where it is difficult for us, the government, to intervene directly because it is determined by market supply and demand. Therefore, I humbly request the government to negotiate with airlines to increase flight frequency, especially to areas with high demand, so that it reaches a level of balance and stabilises airfares. Also, it can explain to the airlines to use larger aircraft to meet demand. I also request that the government look into expanding existing initiatives such as the Rural Air Service (RAS) and also existing discount programmes for students and undergraduates, which can also be extended to the general public in Sabah and Sarawak who often need to travel for medical and educational purposes. We can take an example from other countries such as South Korea, where airlines have given discounts only to residents of Jeju, so that if residents of Jeju need to go to Seoul, they will get a discount of 10 to 20 per cent on the airfare. This is because for them, the residents of Jeju, going to Seoul is not for tourism purposes, but for important business that they must attend in the capital. Indeed, Kuala Lumpur is the capital not only for the states in the Peninsula, but also for the people of Sarawak and Sabah. Therefore, we must make Kuala Lumpur easier to access for the people of Sabah and Sarawak so that they too can come here to carry out matters in terms of administration or the economy. Therefore, I request the government to continue making efforts to find ways to solve this problem of expensive airfares.

Tuan Chiew Choon ManPKR · PHMiriEN

Rural Air Service (RAS) and also existing discount programmes for students and undergraduates, which can also be extended to the general public in Sabah and Sarawak who often need to travel for medical and educational purposes. We can take an example from other countries such as South Korea, where airlines have given discounts only to residents of Jeju, so that if residents of Jeju need to go to Seoul, they will get a discount of 10 to 20 per cent on the airfare. This is because for them, the residents of Jeju, going to Seoul is not for tourism purposes, but for important business that they must attend in the capital. Indeed, Kuala Lumpur is the capital not only for the states in the Peninsula, but also for the people of Sarawak and Sabah. Therefore, we must make Kuala Lumpur easier to access for the people of Sabah and Sarawak so that they too can come here to carry out matters in terms of administration or the economy. Therefore, I request the government to continue making efforts to find ways to solve this problem of expensive airfares. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Miri. I now invite the Honourable Minister to reply within 25 minutes.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Thank you to Madam Speaker and thank you to all the Honourable Members who have taken part in the debate on the Ministry of Transport (MOT) at this Committee stage. Allow me to give some brief information first in general. The Ministry of Transport (MOT) welcomes Budget 2025, themed "Membugar Ekonomi, Menjana Perubahan, Mensejahtera Rakyat", to ensure that the economic prosperity achieved can be translated into an improvement in the quality and standard of living of the rakyat. The initiatives of this budget certainly reflect responsible and balanced fiscal management to support and accelerate the national reform agenda while addressing the main issues of the rakyat. A total of RM6.596 billion has been allocated to the Ministry of Transport for the overall estimated operating and development expenditure for 2025, an increase of 4.68 per cent compared with 2024. Through operating expenditure allocation, MOT has been allocated RM1.7 billion, an increase of RM60 million compared with last year. This increase is in line with the salary increase for civil servants and will certainly bring welfare to MOT personnel. Meanwhile, RM4.894 billion has been allocated for the implementation of 116 projects or development programmes that have been approved under Rolling Plan 5, Twelfth Malaysia Plan (Rancangan Malaysia Kedua Belas). Of that amount, RM4.2 billion or 86 per cent is for continuing the implementation of 97 continuing projects or

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

the balance of RM682 million to implement 19 new projects approved under Budget 2025. By comparison, the DE allocation approved under Budget 2025 increased by 5.35 per cent compared with last year. This increase is due to the approval of several projects such as the Penang LRT, and also the implementation of existing continuing projects that are at their peak stage, such as RTS Link, the Klang Valley Double Track Project (KVDT1 and 2), the Gemas - Johor Bahru Double Track Railway Project, ETF 3 procurement, the Kota Bharu and Tawau Airport Expansion and Upgrading Project, and the projects to demolish, build and upgrade the passenger, cargo and RORO terminals and jetty at Kuala Kedah. In line with the theme of Budget 2025, MOT has been tasked with continuing the public transport subsidy programme to help the rakyat reduce the cost of living. A total of RM508.9 million, or nearly 30 per cent of the total operating allocation of MOT, has been allocated for public transport subsidies covering land, rail and air as follows – ■1650 • Unlimited monthly pass incentive in the Klang Valley area and Pas Mutiara in the north with an allocation of RM226 million. • Non-Economic Train Subsidy on the existing route from Tumpat to Kuala Lipis and an additional route to Gemas with an allocation of RM22 million, • the Free Travel Pass initiative for school students and persons with disabilities (OKU) with an allocation of RM3.9 million for KTM commuters, • Rural Air Service (RAS) Subsidy in the interior of Sabah and Sarawak as well as the new routes of Kota Kinabalu to Layang-layang and Miri to Long Banga amounting to RM209 million. • RM48 million for the FLYsiswa Airfare Subsidy and the festive season, which will benefit 60,000 undergraduates and the rakyat, especially in the states of Sabah and Sarawak and the Federal Territory of Labuan. The development expenditure allocation of RM4.894 billion will be utilised for the implementation of 116 projects, which will be categorised under five main categories, namely: (i) railway projects amounting to RM2.1874 billion or 44 per cent; (ii) urban public transport amounting to RM1.8 billion, 34.56 per cent; (iii) air transport, RM310 million or 6.35 per cent; (iv) maritime transport amounting to RM199.5 million; and (i) an allocation of RM286 million for the cost of developing, upgrading and maintaining assets and systems used under the agencies.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Mr Chairman, I find it difficult to answer every single question raised, as there are dozens of questions raised by almost 20 debaters, but I will try to answer several key questions, the main questions. Firstly, I would like to answer the question from the Jerantut side. Jerantut has raised several questions regarding Kemaman Port. Kemaman Port is indeed under our planning and we will finalise it in terms of the technical study and it will be raised for consideration by the Ministry of Transport on how we implement it. But generally, for the information of the Honourable Jerantut, in terms of the development or expansion of ports now, we usually leave it to the operators to generate or invest in their DE or CapEx by giving longer concessions to the operators. For example, at West Port, it did not involve government allocation. They enlarged the wharf to be expanded, capacity was added, but we gave a longer concession to the operator to recoup their investment. So in the case of Kemaman, we will see whether the same model will be used or other models. So far, there is no decision yet, but I have already expressed my intention to the operators at Kemaman Port that I will visit Kemaman Port in January and there will be further discussion with Kemaman Port. Next, the Honourable Member just now did mention— and also the Honourable Member for Merbok also raised the issue regarding Kulim (KXP). On the KXP issue, as we have answered many times in this august House, an official application was only submitted by the Kedah State Government last August. Although this matter has been controversial since last year, I have repeatedly answered that last year there was indeed no official application. An official application to apply for an aerodrome was only submitted last August. Currently, there are two parties identifying or evaluating the application, namely CAAM technically – Civil Aviation Authority Malaysia and also MAVCOM to see the feasibility or whether the aerodrome can be approved. So, my decision as Minister of Transport must of course be based on their recommendations. So far, their report has not reached my office. One thing we need to take into account, for the information of Honourable Members, is that we are evaluating it objectively. There is no political element, no other element at all. We will evaluate it objectively. If it meets all the requirements, of course we will have no problem in giving the decision. But there is one very important factor that many Honourable Members have failed to take into account, namely that close to Kulim there is an airport at Butterworth. That is the air base of the RMAF.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

So, the feedback from the RMAF is very important, whether it will or will not disrupt the movement of ships and aircraft of the RMAF in the surrounding area. So, that is a very important factor in whether a new aerodrome can be placed in a nearby area. So, if that can be resolved, then we have no problem. But I would like to give a view first that this is one of the very important considerations because it involves the national air force base. This involves national defence not only in the northern region but across the whole of Peninsular Malaysia. So, this is an important matter. I want to give a commitment that my consideration as Minister of Transport is based on all objective evaluations. The work of us in the government must look at the interests of the whole nation. In this regard I am somewhat disappointed with the view of the Honourable Pasir Mas just now who questioned the Penang LRT Project. It seems that the Honourable Pasir Mas, whenever anything concerning Penang is involved, he...

I asked, Minister. I was asking, not disputing.

Tuan Loke Siew FookDAP · PHSerembanEN

It's all right, it's all right. Sit down. Let me answer first. Just now the Honourable Member questioned the passenger projections. I want to state that, firstly, in terms of this public transport project, indeed it is difficult to recoup the investment. That is true. All these public transport projects will involve very large government expenditure. If you want to recover the investment within a short period, it is indeed difficult. Most public transport projects are indeed loss-making. But we look at it in terms of socio-economic development. If we talk about passenger projections, to justify them is difficult. Even the ECRL is difficult to justify, for Kelantan. But does the government say that we are not developing the ECRL to Kelantan? No.

Tuan Loke Siew FookDAP · PHSerembanEN

I have been Minister of Transport twice. As for the ECRL to Kelantan, I have never said I do not support it or object to it. We have defended this project all the way to Kelantan. It is not a problem. In fact, recently I tried to convince the Cabinet to look at how to extend the ECRL to Rantau Panjang so that we can connect to Thailand. So, that is the difference between us and the Honourable Member. So, I want Penang to progress, and I also want Kelantan to progress. I want the people of Penang to attain prosperity. I also want the people of Kelantan to get facilities. The same goes for the people of Sabah and Sarawak. So, let us not play politics in the matter of infrastructure. Infrastructure is important for the nation, important for all regions, important for all states. When we build infrastructure, it is a facility for the rakyat. It brings progress to the economy and also to national development. Sorry, Honourable Member. I only have another 15 minutes.

Sikit, tentang...

Tuan Loke Siew FookDAP · PHSerembanEN

It's all right, it's all right. Wait a moment. I want to answer— there are many questions I want to answer from the Honourable Member, especially from Jerantut, my friend. In terms of drivers under the influence, driving under influence, drunk drivers and so on. Strict action is indeed taken. However, in terms of that action, it will be taken by the PDRM, by the police. In any case, drivers under the influence, whether drunk from consuming alcohol or drunk from drugs, drunk from ketum and so on, will all be subject to action by the police in terms of prosecution. So, there is no dispute that we are not taking action. Action has indeed been taken and will be taken, and the penalties have indeed been increased. In this very House too, in 2020, we together passed amendments to the Road Transport Act to increase the imprisonment penalty, which is greater and higher, for any party involved in this offence. So, there is indeed no compromise in terms of any offence, in terms of drivers who drive cars under the influence of DUI. So, Honourable Members, there are several other matters I want to answer as well, to ensure there is understanding. Just now, the Honourable Langkawi, let me answer the Honourable Langkawi first. The Honourable Langkawi asked a very important question which I want to answer, taking this opportunity. The Honourable Langkawi asked why CAAM only received RM100 million out of RM150 million. Let me answer this. It is true, we reduced the allocation for CAAM. Why? Because CAAM is an agency or statutory body. Every year it is indeed short of money. CAAM's collections are not sufficient to pay salaries and so on. So, there is a funding gap. The government had to help by providing an injection of RM150 million so that they remain competitive or remain able to operate, able to pay salaries.

Tuan Loke Siew FookDAP · PHSerembanEN

Next year I want to upgrade CAAM as a statutory body, separated and freed from government remuneration. This means the salary scale, the salary scheme for CAAM staff will be raised. It will no longer be subject to the existing JPA scheme. But the condition is that they must become financially independent. They must be free in financial terms, they have their own funds. How do we generate funds for CAAM? I have approved an increase in aeronautical charges, flight charges especially for foreign aircraft that use our airspace, that pass through our airspace, we have increased the rates. For decades the rate was never increased. We have been giving others cheap services. So, I have increased that charge— aeronautical charges. CAAM's income will rise from more than RM100 million to RM400 million a year. This is enough to finance all of CAAM's expenditure. Thus, we can also raise the salaries of CAAM staff, and this statutory body will become a statutory body with separate remuneration.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

The Honourable Minister.

Tuan Loke Siew FookDAP · PHSeremban

Ya. Maaf.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

I would like to ask, will there be any impact on the rates and costs of air transport?

Tuan Loke Siew FookDAP · PHSerembanEN

That does not involve― I am saying, the major portion is for foreign aircraft. These aeronautical charges are overflight charges. There are indeed some increases and so on, but that is a small component for the airlines, which does not have a major impact on airlines in terms of cost. But the major portion does not involve the national airline. Foreign airlines from neighbouring countries and so on. Imagine the geography of our airspace: every aircraft from our neighbouring countries that wants to go to the West must pass through our airspace. It uses our air traffic control. It has to pay. Every country has to pay, it is charged. For decades it was never reviewed. We reviewed it. We increased these charges, we dared to increase them so that CAAM would have a larger fund. When that fund is larger, we can strengthen CAAM. It no longer needs to be a government department, but a statutory body that is still bound by the JPA scheme of service. It will be fully separated. And I assure the MoF that, please, let us expedite this process, and we can reduce the allocation from the MoF. So this year, we are only asking for RM1 million for the first six months, because if all this process is completed by the second half of the year, we can continue. So, that is a comprehensive answer to the Honourable Member for Langkawi. I hope Langkawi understands so that it does not question this matter. There is another major matter I want to answer in this regard. Because many have raised issues regarding the railway leasing. Why do we want to adopt this leasing model? Many Honourable Members, including the Honourable Member for Langkawi just now, wrote notes to me saying there were complaints, there were grievances from voters of the Honourable Member for Langkawi, saying the KTM in the north is often late, and the Komuter trains are not punctual. Yes, we know. This is indeed a problem, this is indeed a weakness. That is what I am trying to fix. Why is there a weakness in terms of delays? Because there are not enough trains. Many of our trains are faulty. Many Honourable Members from the north have asked for more ETS, more northern Komuter. Of course we want to add more. That is why we are creating a new model to add these carriages more quickly, in larger numbers, within a short period. But Honourable Members themselves are also confused, and still want to oppose this model. I know there are parties that feed information, but do not listen to one side only. Listen to both sides of the argument. Why are we doing this model? If we use a conventional procurement model, how many can we get in one year? Because our budget for one three-year cycle can only get a maximum of perhaps 10 sets. If we want to get 50 sets, we might have to wait 15 years. So, if we add 10 sets, where am I going to put them?

Tuan Loke Siew FookDAP · PHSerembanEN

Putting them in the north is not enough. Putting them in the Klang Valley is not enough. Putting them in the south is not enough. So, we need more carriages. We need more sets. But in terms of our cash flow, we cannot afford it. If we do it conventionally, in terms of procurement, how can the Ministry of Economy give one-time RM10 billion? The MoF cannot allocate RM10 billion directly to the MOT. Our development budget for one year is only RM4 billion. Other ministries also need it. So that is why we are doing a leasing model.

Honourable Minister, may I have the floor?

Tuan Loke Siew FookDAP · PHSerembanEN

This leasing model― let me explain. This leasing model is G2G. Of course, it is negotiation between two governments. When it is negotiated between two governments, the government gives a guarantee. Just now there was a question, "Oh, why from China?" The trains that the Honourable Member is using are also from China. From CRC. There was also confusion just now, even the company name was wrong, it said CSSR. Not CSSR. CRRC. It has a factory at Batu Gajah now. If the Honourable Member is interested, you can go and see. We have no problem providing clarification. This is not a matter of any compromise or anything of that sort. It was said, "Oh, these Chinese trains were sent back by Indonesia." That is also factually wrong. That was ART, not EMU. There is a difference. ART does not need a track. That is an autonomous ART, with no driver, which Indonesia wants to return. That is up to them. But what we are talking about here are EMU carriages, Komuter and also ETS. These are EMUs that need a track and need a driver. We never said we wanted to buy ART without a driver. So, Indonesia's high-speed railway, its HSR, is also from China. It did not return the high-speed railway from Jakarta to Bandung to China. Only the ART was returned. So, ART is different from what we are discussing here. And secondly, Honourable Members, in this agreement, the Government of Malaysia will also require that an SPV be established. This SPV must have a majority shareholding of 51 per cent by the Government of Malaysia, in a joint venture with the Chinese side to develop these trains. And in terms of the fate and welfare of KTMB workers, there is no direct impact at all. We have never said we would reduce even one KTMB worker. Never. So, KTMB workers still have their jobs because there are many other trains that need to be maintained. If we can add more train sets, operations will increase, and of course we need workers. It is impossible for KTMB workers to be reduced. So, I hope that Honourable Members― including the one from Klang who also questioned this. Even the BBC questioned this. It also does not understand. So, this is not a matter of us having some plot with any party. This is in terms of a practical step, a practical solution.

Tuan Loke Siew FookDAP · PHSerembanEN

Honourable Members asked for more trains, more frequency, for comfort. We have done it. Within three years we will get 50 new train sets. Add them for the north, add them to reach Perlis, add them for the south, the Klang Valley and so on. Including the East Coast. So, Honourable Members, I hope this matter can be understood and does not become a polemic. Because what we want to do is open, we do not hide anything. I make announcements. When there is a Cabinet decision, I inform the public. I answer in Parliament. There is no hiding. So, what we are doing is for the national interest, to provide a better train facility for the people, for our country, and so that together we can develop more quickly and achieve a transformation― this is what was emphasised by the Honourable Prime Minister. If we do it gradually, the problem will not be solved. We want a major transformation, a rapid transformation...

Honourable Minister, I agree with what the Honourable Minister said.

Tuan Loke Siew FookDAP · PHSerembanEN

Yes, thank you.

Those over there also do not understand, and those over here also do not understand.

Tuan Loke Siew FookDAP · PHSeremban

Ya.

But regarding the ETS to Padang Besar, Honourable Minister...

Tuan Loke Siew FookDAP · PHSerembanEN

Sorry. Sorry, Honourable Member. There is still a lot of this.

When I took it at Alor Setar, it was already 80 per cent full. This is because many tourists board from Thailand. But when it was not available there, I took the one from Butterworth. Butterworth's is rarely ever 100 per cent full.

Tuan Loke Siew FookDAP · PHSeremban

Ya.

I would like to propose that one of them be pulled from Butterworth to Padang Besar, because it not only takes our passengers from the north but also those tourists. Can the Honourable Minister consider it? Thank you.

Tuan Loke Siew FookDAP · PHSerembanEN

I understand, I understand. We do know there is an issue in terms of ticketing on how we can optimise it. So, if there are indeed those shortcomings, we will certainly take them into account to improve them. I have no problem receiving any views from Honourable Members in order to further enhance the quality of our services. So, I hope you do not raise...

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Honourable Minister, the issue of demerit is a bit much.

Tuan Loke Siew FookDAP · PHSeremban

Isu apa?

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

The issue of demerit. Kuantan just now.

Tuan Loke Siew FookDAP · PHSeremban

Kuantan?

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

The issue of demerit. Demerit.

Tuan Loke Siew FookDAP · PHSerembanEN

Demerit. Demerit, I will answer in more detail later through a written reply. But I want to inform you that just now, several Honourable Members raised the matter of ferry tickets. I would also like to give some clarification on this. I am also rather puzzled that many Members from states outside Penang are so concerned about the losses of the Penang Ferry.

Tuan Loke Siew FookDAP · PHSerembanEN

It is true that the Penang ferry operator is making losses, but that is not borne by the government. It is borne by the operator, Penang Port Sdn. Bhd., because it is among the obligations to Penang Port when they took over the Penang ports, they must provide ferry services for Penang. So there are indeed losses. So we want to help these operators. Indeed, we are trying to obtain a diesel subsidy for the ferry operators, and the Ministry of Transport has already held discussions with the Ministry of Finance. I think we will soon convey good news. In principle, the Ministry of Finance has no problem, but I need it in black and white, a letter from the Ministry of Finance first, confirming that a subsidy will be given to the operators. I stated in this august House that when a subsidy is given, we are not partial. It is not only the Penang ferry operator that will receive a subsidy. The Langkawi ferry will also receive it, the Tioman ferry will also receive it, the ferries near Sabah will also receive this subsidy. [Applause] So if it is received...

Dato' Abdul Khalib bin AbdullahBERSATU · PNRompinEN

Thank you, Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

...Everyone will receive it, everyone will be given. So that we can ensure these ferry operators survive, that they can continue their operations, and that tickets do not burden users. This is what is important. So, in this regard, we are fighting for it, and we really want to convince the Ministry of Finance. We want to rationalise subsidies, but several of these operators must be helped because these are mandatory services. If we do not give subsidies, no ferry operator would want to run, and from Kuala Kedah and Kuala Perlis to Pulau Langkawi there would be no network anymore. We cannot cut off connections. So, that will indeed be done. Langkawi asked whether there are operators willing to run taxis? If there are operators willing to invest, I welcome them. The Honourable Member for Langkawi should bring it to me, and I will try to facilitate this matter. So there is no problem if any party wishes to open or start new operations to obtain a licence to provide better services to residents. So I hope...

Thank you, Honourable Minister. I raised Penang not to meddle, but it is in public news, with permission.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, thank you.

Tuan Lee Chean ChungPKR · PHPetaling Jaya

Yang Berhormat.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Minister, Padang Rengas, Minister.

Tuan Lee Chean ChungPKR · PHPetaling Jaya

Petaling Jaya.

Tuan Loke Siew FookDAP · PHSerembanEN

Yes, Petaling Jaya asked about that motorcycle e-hailing. This motorcycle e-hailing...

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

If there are those who are interested, can they be given the opportunity?

Tuan Loke Siew FookDAP · PHSerembanEN

Motorcycle e-hailing was once a pilot project, but I think at that time it did not really get much response. But if there are operators who want to do a sandbox and so on, I welcome it. We are open to doing this proof of concept (POC). If in Petaling Jaya there is one area– but let me first give my view to the Honourable Member. The culture of Malaysians is not really fond of using motorcycle e-hailing. That may be my mistake, I may be wrong. If there is evidence that this POC succeeds, I am open to this view. We hope it can enable or further ease the burden for the first mile and last mile.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you very much.

Tuan Loke Siew FookDAP · PHSerembanEN

So, I am quite open if there are applications, I will discuss with the Road Transport Department (JPJ) and also with APAD to give an approval in principle for the POC first.

Tuan Lee Chean ChungPKR · PHPetaling Jaya

Okey.

Tuan Loke Siew FookDAP · PHSerembanEN

Because everything also needs a proof of concept (POC). Without a proof of concept, it is difficult for us to give approval.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you very much.

Tuan Loke Siew FookDAP · PHSerembanEN

So Mr Speaker, I no longer have time...

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Minister, Padang Rengas.

Tuan Loke Siew FookDAP · PHSerembanEN

Many, I know there are many who have stood up about...

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

If there is no time to give in writing, Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Yes, certainly in writing, I will give everything.

Tuan Chiew Choon ManPKR · PHMiriEN

Flight tickets, Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Regarding many other matters. I will give in writing to Honourable Members so that we can provide clarification, but as usual...

Honourable Minister, Setiu a little? I only want a short explanation, Setiu can?

Tuan Loke Siew FookDAP · PHSerembanEN

Enough with Setiu, yes. I have already landed.

Tuan Loke Siew FookDAP · PHSerembanEN

Already landed because there are many issues here. If I were to give them one by one, it would be very difficult right now, orally.

I just want to ask the Minister to go down to the ground and visit the ECRL alignment area. Although the Minister said there were views from the JPS when the alignment was made, what happened, as I mentioned in the debate, was the opposite. Many areas were submerged in water during floods.

Tuan Loke Siew FookDAP · PHSerembanEN

I will, I will...

Please ask the Minister to go down.

Tuan Loke Siew FookDAP · PHSerembanEN

I will try to go down, I will ask that– Indeed I have not gone down, including to the East Coast states. Kelantan, Terengganu, I have indeed gone down. Kedah, I have gone down to all of them. As I said, we are not only going to states under the Unity Government.

Setiu, I will bring it to Setiu.

Tuan Loke Siew FookDAP · PHSerembanEN

So for the immediate matter, now is indeed the flood season. I know, I feel sympathy and I extend my sincere condolences to the people of the East Coast, especially those hit by the great floods now. KTMB has indeed been affected, I just received a report a moment ago. The KTMB track has been inundated. The DMU route cannot move now, it cannot pass through the railway tracks. So, if there are any areas said to be flooded because of the ECRL project, I will ask MRL to go down as quickly as possible to see how to provide mitigation. In terms of the alignment, it cannot be changed anymore, Honourable Member. If the alignment includes bridges, flyovers, everything has already been built. How can we demolish them and move them elsewhere? It cannot be done.

[Speaking without using the loudspeaker] ...Change, only repair what is damaged.

Tuan Loke Siew FookDAP · PHSerembanEN

That is indeed impossible, but we need to have mitigation. There is mitigation on how to make flood control and so on. I will ask MRL to do it immediately so that these flood issues can be resolved. So as to ease the burden on the people around the affected areas. That is all, thank you. Once again I thank all Honourable Members for supporting the budget for the Ministry of Transport.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Minister. Honourable Members, the question is that the sum of RM1,702,433,900 for Head B.28 of the Estimates of Operating Expenditure 2025 be made part of the Schedule.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

[Question put for decision, and agreed to] [Head B.28 ordered to form part of the Schedule]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members, the question is that the expenditure under Head P.28 of the Estimates of Development Expenditure 2025 be approved. [Question put for decision, and agreed to] [Head P.28 to form part of the Estimates]

Bill — Supply Bill 2025 and Development Estimates Motion 2025 Committee — Head B. 47 [Schedule] – Head P. 47 [Development Estimates 2025] –Bill

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Supply Head B.47 and Development Head P.47 under the Ministry of Communications are open for debate. The list of debaters is as follows. Honourable Jelutong, Honourable Tasek Gelugor, Honourable Segamat, Honourable Pasir Mas, Honourable Shah Alam, Honourable Masjid Tanah, Honourable Bangi, Honourable Kepala Batas, Honourable Pasir Gudang, Honourable Langkawi, Honourable Kudat, Honourable Padang Besar and Honourable Pekan. I invite the Honourable Member for Jelutong.

Thank you, Madam Chairman. Today I am wearing an orange ribbon because we always defend women and will oppose anyone who tries to be violent towards women. [Applause] Thank you, Madam Chairman. I stand to support this budget and I would like to refer to Item 020500 – Broadcasting (RTM) and also Item 040400 – National Day and Malaysia Day Celebrations. I see that there is a reduction in the budget allocation for Item 020500 from RM551,000 to – RM551 million to RM441 million. I am here, firstly, to ask why? Because in my view, we need to further strengthen and reinforce broadcasting by RTM, which is the official government broadcasting station. Especially to promote programmes that can lead to pluralism, prosperity, well-being and togetherness among multiracial Malaysians. The unity of the people is something that must be highlighted at all times. Here I commend the Minister and Deputy Minister who are present. When I saw the National Day celebrations. The song broadcast was Macha Macha by Zubair Khan. It was a conclusion where the song was sung in Tamil, but at that time I myself did not know that the singer was Zubair Khan. He is of Pakistani descent and is now a Malaysian citizen.

His father and mother are from Pakistan but he is a Malaysian citizen. A Malay whose song is so pleasant to listen to and also gives a boost of spirit.

This is one of the examples I wish to use, where that song was played during the National Day parade. We can see that all the youths who took part in the National Day parade sang that song and danced to the same rhythm, and this gives a concept of Malaysian-ness that should be encouraged. So, I take this opportunity to urge the Minister and Deputy Ministers to further strengthen programmes of this kind. Because we see nowadays that there are parties who tend to divide us, to incite, to use small matters to divide us. So, I feel that we can only counter this incitement, the actions of certain parties to divide the multiracial people of Malaysia, by promoting our local talents, with respect, such as Zubir Khan, and by giving him many more broadcasts on RTM so that he and other local artistes will have a platform to broadcast their programmes and songs. Before I end my speech, I also wish to touch on National Journalists' Day.

YB Jelutong. YB Jelutong, may I interject briefly?

Boleh?

Bangi, my friend. Give way.

Okay, thank you. Thank you.

Madam Chairman, may I have a little more time?

[Laughter] I just want to take this opportunity to praise the National Day celebrations this year, where for the first time we have a parade from various races, which shows that this is a recognition that Malaysia has a diversity of races and heritage. Thank you.

Thank you, Bangi. Please include it in my speech. Before I end my speech, Madam Chairman, today I read a rather shocking report in Malaysiakini entitled, "Journalist Who Exposed Migrant Workers Issues Have Been Threatened". In this context, I wish to refer to National Journalists' Day. Item 040600 – Hari Wartawan Nasional (HAWANA), where I see that the allocation is the same, RM5 million. I feel that this allocation should be increased. We need to praise journalists who expose any scandals, and give them awards. In this context, I ask that the ministry provide protection to these two journalists, namely S Vinotha and B Nantha Kumar, journalists from

Malaysiakini, who have already received threats for exposing the issue of human trafficking nowadays. So, I take this opportunity to support the Budget that has been tabled. That is all, thank you. I beg to support.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Jelutong. I invite the Honourable Member for Tasek Gelugor.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

Thank you, the Chairman I respect, fellow Honourable Members. I go straight to Item 020200 – Strategic and Corporate Communications. I think we should also combine it, Chairman, with Item 020700 – Community Communications (J-KOM). I ask the Honourable Minister to explain, what programmes and activities are planned under this heading? Does it include training programmes to improve strategic communication capabilities and especially the funds allocated to J-KOM? Does it also involve activities carried out at the grassroots level and what are those programmes? Chairman, I ask this because I see many weaknesses in the way the government handles matters that may become big and controversial in our country. For example, recently I take the closest example to the present time, namely the granting of 5G spectrum to U Mobile. From the very beginning the ministry should have had a competent communications plan to handle various sensitive issues, especially when we know that part of the shares in U Mobile are held by the Yang di-Pertuan Agong. Surely an issue of this magnitude could not have gone undetected from the start by the ministry, resulting in no planning on how to handle this matter well. As a result, various vile comments arose about this issue, which should not have been allowed to happen from the very beginning. As usual, various excuses were given as to why it happened, but in my view this is a mistake and a weakness of the government which lacks early planning, and it must be rectified with the existing allocation so that it does not recur after this. Next, Chairman, Item 020100 – Policy and International. I want to focus on matters relating to government policy. Again, the matter concerning 5G spectrum. I ask the Minister to explain, what is the government's actual policy today towards Digital Nasional Berhad (DNB)? Until today, U Mobile remains as one of the companies that is an owner of DNB. But the government wants U Mobile to compete with DNB. This situation is in fact strange, where a private company can be the owner of a GLC and this private company's mandate is to compete with that GLC, which is certainly one of its aims, to defeat its competitor in the market. Why has the government until today failed to announce a firm exit strategy for U Mobile? I have been informed that as a result of the pressure we have applied within the

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

House and outside the House, U Mobile's representatives on the DNB board have already resigned as Members of the Board of Directors of DNB. Alhamdulillah, that is a positive development. But what about the share ownership issue I mentioned earlier? What is the government's actual policy? I also ask the Minister to explain, what is the government's policy concerning the debts and liabilities of DNB? If, as a result of the government's policy that U Mobile must compete with DNB, U Mobile succeeds and DNB does not succeed, and in fact makes losses. Then, who will bear the debts and liabilities and the losses borne by DNB? Will the government bear them, as a result of the government's own policy? I have really never heard of any government that introduced a policy that caused a government-owned company to make losses. So Chairman, if on these policy matters the government still fails to explain them, I feel that we on this side will not hesitate to propose the establishment of a Royal Commission of Inquiry (RCI) to fully investigate the weaknesses that have occurred so that this matter does not recur. Mr Speaker, next the matter mentioned by Jelutong earlier. I also want to correct the code that Jelutong mentioned earlier, which was in fact wrong. The correct code is 040500 – Hari Wartawan Nasional (HAWANA). What was said earlier was slightly mistaken. I appreciate, as Jelutong said earlier, I appreciate the recognition given by the government to the journalist community. Journalists play a very important role, ensuring that the people receive accurate information, ensuring that news is delivered at the right time and so on, and it is indeed very appropriate that we celebrate them, including in the form of National Journalists' Day (HAWANA). I also place on record my appreciation to the government for allocating a sum of money for the Tabung Kasih@HAWANA. This is a good step, and in addition there is a news report, where the Honourable Minister looks handsome in the middle of that photo [Referring to a copy of a document], saying, "Tabung Kasih@HAWANA expanded, helps media friends affected economically". I want to record my appreciation that this is a good matter. I hope the allocation provided for Tabung Kasih@HAWANA is increased because in this era many journalists have lost their jobs. However, Mr Speaker, I ask the government to ensure that the government's measures to help these journalists are not turned into a pretext by employers who wish to evade their responsibilities. We know that many people are losing their jobs nowadays. Some are working but not receiving wages, EPF contributions are not being paid, SOCSO is not being paid. I think the Honourable Minister already knows, once I mention that topic he can already read what I mean. The responsibilities of employers towards journalists must be fulfilled without delay. The most urgent, Chairman, this is my last point, concerns the welfare of journalists working with The Vibes, TMI and Getaran. The funds allocated must be used

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

to help them now, not merely on National Journalists' Day, because many months of their wages have not been paid, EPF has not been paid and compulsory contributions have not been paid. This is true. If other companies, in fact, the owners (employers) have long been subject to travel bans and various other actions for failing to pay compulsory contributions. But I regret that the owners of these three companies were able to come to our Parliament just yesterday, accompanying VIPs to Parliament. Why is there a double standard? If the owner of SMB who did not pay EPF has been subjected to various restrictions, but these owners, who may have political connections and so on, can come here accompanying VIPs, as if they too are VIPs in our country. So, I request the Minister to respond. Thank you, Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Tasek Gelugor. I invite the Honourable Member for Segamat.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Thank you, Deputy Chairman. First, I would like to thank you for giving the opportunity to debate the Ministry of Communications. I also wish to take this opportunity to praise the Ministry of Communications because from the first day until today it has taken various steps to resolve various issues relating to the ministry. There are also several matters that I will raise, and I am confident there will also be solutions and joint efforts. The first is Item 030200 – Control and Compliance. What are the measures to combat the harms that are increasingly rampant on social media, when Malaysia is also the second fastest in 5G download speed in Asia Pacific?

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Is the government ready to provide this House with statistics on online gambling and scam issues that show the government has made efforts to curb the harms and crimes occurring online, where stricter laws and actions should be imposed on these criminals? Third, is to state the ministry's efforts in tackling the issue of scams through online means and also through telephone calls. Recently, scammers have used the government's logo and the STR initiative and so on to make the people easily fall for their bait and click on the link or URL. Firm preventive action must be taken because these scams not only misuse the name and coat of arms of the government but also target ordinary people or the marhaen who are struggling here. There is also an issue I would like to bring to the attention of the Honourable Minister, the issue of piracy, where we see movies, films, or songs created in Malaysia, especially by local artistes, and we see that there are also efforts that record and disseminate this piracy information, and firm action must also be taken.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Next is Item 030000 – Infrastructure and Telecommunications. Why do schools still use Telegram as their main communication channel, when this platform is known to have major security issues such as breaches of privacy, misuse for illegal activities such as the distribution of drugs, weapons and pornography, as well as data leaks due to hacking? Why does the ministry not develop or identify a safer communication platform that can be monitored and complies with the ministry's regulations? Does this year's budget allocate funds to develop a communication platform, particularly one that can accommodate a large number of users, is safe and protects student security? What is the ministry's strategy to ensure students' digital security is guaranteed and how will enforcement on the use of this platform be implemented? Why must Malaysia always depend on media platforms originating from abroad such as Meta, WhatsApp and so on. If we look at China, there is still a Chinese version of TikTok, and they also have a Chinese version of Facebook including Google. They have the DiDi, Alipay and WeChat applications which were founded or innovated by their own government. I hope and I am confident that the Minister of today is able and will also do something major to change or introduce a new application in the local [context] so that we are safer when using it and also protect the people's data and the well-being of the people. In connection with that also, Item 030200 – Control and Compliance. What are the government's findings in its efforts to tackle the issue of child grooming through social media platforms and also the issue of child pornography, as well as the government's initiatives in awareness and education towards the general public? Finally is 020500 and 020400 – Department of Information (JPen). To what extent has the Ministry of Communications studied and has a clear strategy to empower the role of RTM through the Malaysia MADANI programme to ensure government initiatives reach the community in the major languages of Malaysia such as Tamil, Mandarin and Malay? What proactive measures are taken to counter the increasingly rampant fake news and how is the effectiveness of this strategy measured to ensure accurate and effective delivery of information to the people? For example, I also wish to convey that issues outside are always being manipulated through fake news. I suggest whether the ministry will consider using official government media platforms through Bernama Tamil News, RTM Tamil News, Astro Seithigal and the official Tamil newspaper of the Malaysia MADANI Government so that the information disseminated through these portals or official news can reassure that the Malaysia MADANI Government delivers verified information, true information so that we can promote the efforts of the MADANI Government.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Therefore, I am confident that the ministry also has answers and will cooperate to work towards a more excellent direction. That is all, thank you. Segamat supports.

Mr ChairmanEN

Alright. I invite Pasir Mas.

Assalamualaikum warahmatullah and salam sejahtera. Thank you, Tan Sri Chairman. I go straight to Item 030000 – Infrastructure and Telecommunications. Tan Sri Chairman, I wish to once again question the government's step as mentioned by Tasek Gelugor earlier. The government's step of awarding the second 5G contract to U Mobile. An action that raises great doubts about the transparency and accountability in this award process. The Minister has responded, but with an answer that I feel is still unclear regarding U Mobile's actual capacity to be granted this award. According to the report from the Malaysian Communications and Multimedia Commission (SKMM), U Mobile only controlled around 14 per cent of the telecommunications user market in Malaysia in 2023. Much smaller compared with major competitors such as Maxis and CelcomDigi, which each controlled more than 35 per cent of the market. Besides that, U Mobile does not have a strong track record in large-scale infrastructure development compared with other companies that have invested significantly in 5G technology for several years. I have no interest in the companies mentioned earlier, but it has become a doubtful matter among the people. What is more worrying, U Mobile was previously owned by foreign investors to the extent of 49 per cent, although there is a commitment to reduce foreign shareholding to 20 per cent, it is still in the process of transition. So this is what the people are questioning. The Minister once answered that because of certain matters, for example consumer complaints and so on. The question is whether these issues or characteristics were disclosed in advance, which could allow other competitors to stand on an even footing and a level playing field? This is what we are worried about. I urge the government to provide an immediate explanation, including disclosing the technical evaluation report from the financial aspect, to ensure this process is truly transparent. Item 020300 – Content Development. We see positive developments in the creative industry with more people entering this field and some of them becoming influencers on social media to generate income. But there is some concern when not a few influencers use their platforms for excessive entertainment and indecent conduct purely to conduct business. I would like to propose that the ministry could provide incentives and develop a supporting economy so that we can bring forward more social media influencers from academic and professional backgrounds, and also prevent the broadcasting of content that violates the law.

I would like to raise a few points with the Minister. The Minister once said that the video of the Prime Minister's interview with CNN had been edited and did not show the full context, on 15 November 2024. Up to today, no action has been taken against the person who edited this video. It was raised in this House before, and the Deputy Minister said it had been handed over to the police. 15 November and now 27 November, that means almost two weeks. But there has been no action against the person who edited the video of our beloved Prime Minister. So the problem we face today is that when the Prime Minister said words or stated facts to CNN, it was claimed that it had been edited. So I want an explanation. Was it edited or not? If it was edited, please bring these people before the court immediately. Because I worry that yes and no may be swapped, or no may become yes, and so on. This could cause us to misjudge the Prime Minister. Tan Sri Chairman, Item 020000 – Strategic Communication and Creative Industries. We welcome the government today using its own state-owned broadcasting companies or private broadcasters, state-owned or private broadcasting, to convey information directly to the people. However, I am disappointed when the government makes it an information agency for a political party, no different from the era that the PM called the "zaman edan" era. I think this practice is outdated, and using public funds for the interests of a political party is certainly not liked even by the government itself. The government needs to distinguish when it speaks as the government and when it speaks as a political party. That is why I am not surprised that some Ministers have had to use their social media accounts like netizens. I apologise to the Minister. I think the Minister is a good person, a good man, but perhaps because the Minister has been entrusted to be the voice of the government, the Minister ends up having to act like a netizen. I apologise to the Minister once again. A few hours ago, I found that the Minister had reposted a statement on Twitter that used harsh words. If I am wrong or I have mistaken the Minister's Twitter account, I apologise. But reposting, retweeting harsh words. For example, one user. I do not need to say his name. He stated "Siap-siaplah Pengerusi MARA 2017", and with apologies, Tan Sri Chairman, "Paling jahanam".

These are words that are not suitable to be used on social media. It is fine for ordinary people. But if a minister reposts them, the people see it. Surely a minister should not repost things like this. So, it seems the minister has acted as a netizen, and I am disappointed, and I feel this is not suitable for the situation or the position of a minister, whom I am confident has principles and a distinct character, and I feel this matter can be improved.

Tan Sri Chairman, I also want to mention Item 040200 – Contract Staff Emoluments. I want to raise the payment of allowances or salaries of staff under the Ministry of Communications. Last week, a RTM contract staff member posted on social media stating that he had not received his salary two months after starting work, and the same situation also happened to his colleagues, and this was written on his own social media. So, how is this issue being addressed by the Minister? Following that, he was reportedly threatened by the ministry's higher management to take down the post. Moreover, RTM made an attempt, issued a denial saying it was an isolated case. So, how can workers at an agency that receives a permanent allocation from the government face a delay in salary payments? Tan Sri Chairman, and I also want to touch on Item 040400 – National Day and Malaysia Day Celebrations. Previously the allocation was RM20 million. Next year the allocation is RM25 million. We congratulate and I hope that, whatever it is, we from this opposition side will also be involved to some extent, yes Tan Sri Chairman... [Applause] Perhaps behind any events, or it could be possible for us to watch live at the venue. The performances and also the grandeur of the Malaysian National Day that is so glorified. Lastly, Tan Sri Chairman, the TV Broadcasting Programme or one-off, if I am wrong I apologise. Item 060500 which is allocated RM26,847,000. I take this opportunity to congratulate creative film producers. The latest film, Tan Sri Chairman, Lahad Datu. Very impressive in arousing the spirit of identity and also the grandeur of the sacrifice of our soldiers, and when we are now, when I was still little I still remember we watched films like Darah Satria and also films produced by the Government of Malaysia, Bukit Kepong and so on. If only the ministers of today would produce government-produced films that truly take root in memory until future generations. Thank you Tan Sri Chairman... [Applause]

Mr ChairmanEN

Alright. I invite the Honourable Member for Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Assalamualaikum warahmatullahi wabarakatuh. Salam Malaysia MADANI. Salam Rahmah. Tan Sri Chairman, I would like to draw the attention of the House to Item 020700 – Community Communication (J-KOM). The allocation for the Department of Community Communication (J-KOM) totals RM13.18 million. I want to raise the question of how J-KOM will continue to function effectively to ensure that the government's messages and initiatives reach the people without a director. Previously Professor Agus was for one year. Then, Dr. Mohd. Khairuddin Othman for about six months. The changes and absence of the Director of J-KOM have caused speculation among the public about the direction of this department. However, up to now no clear timeline has been given for the appointment of a new director-general, and it is certain that

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

this raises questions about the competence and effectiveness of government communication with the community. In today's digital era, we must act quickly to obtain information and also to counter attack or provide accurate information, especially with matters that are often sensationalised. For example, as mentioned by the Honourable Member for Pasir Mas earlier, "disunting" (edited). It is indeed edited because it was cut into short pieces. The full interview with Richard Quest should have been told by the PMX. It was edited because he cut it into short pieces. So, it was indeed edited. There is actually no issue. But it was sensationalised as if it were reported as something deliberately fabricated. So, how will the ministry restructure and devise a new strategy regarding the role of this J-KOM, and ensure that J-KOM can carry out the government's initiatives. Ensuring that effective communication can be carried out from time to time. In this regard, Tan Sri Chairman, Item 020400 – Department of Information (JaPen) with an allocation of RM171 million. Within this Department of Information there is one MADANI Community Committee. I think it is a very good initiative, Tan Sri Chairman, because it engages (melibat urus) with the community, providing explanations on policies, directions, government initiatives, countering attacks that defame the government and also undermine unity. I happen to be involved in several programmes organised by this MADANI Community. It is indeed good. A very, very good programme, well received by the community. However, the allocation given is only RM3,000 a month to this committee. What can be done with only RM3,000. Perhaps only one programme. So, I suggest to the ministry, please do your best to increase this good programme, the allocation at least RM10,000 for one MADANI Community. If it cannot be RM10,000, Mr Chairman, RM15,000. That would be even better. Insya-Allah. Next, Item 02014 – High Definition Digital TV Broadcasting System. I want to raise this issue because it has received a high allocation, from RM300,000 in 2024 to RM46.8 million for 2025. Surely it is a government commitment to improve digital broadcasting infrastructure. However, several questions regarding challenges need attention, because this issue will certainly affect access for those in rural areas. So, how will the government ensure that the issue of connectivity in rural areas can be resolved with the increase in this allocation? What additional steps will the government take to improve access for those in rural areas, and of course this involves the National Digital Network (JENDELA) mentioned in Item 31003 – National Digital Network (JENDELA). There is no water. [Drinks water] – Thank you. Eating a lot of nuts, Mr Chairman.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

An allocation of RM800 million in 2025, and we are informed that there are several initiatives implemented by JENDELA that have stalled. Several projects have not met the set timeframe targets. So, I want to get an explanation from the ministry on how well this backlog can be managed, and― so that we return to the set timeline. Thank you Tan Sri Chairman.

Mr ChairmanEN

Alright. I invite the Honourable Member for Masjid Tanah.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Thank you Tan Sri Chairman. Masjid Tanah would like to touch on Item 020900 – National Film Development Corporation Malaysia (FINAS) which totals RM36 million. Previously, the issue of misuse of funds was raised, as well as several improvements that have already been made by FINAS. So, congratulations and well done from me. Can the Honourable Minister explain what the target of this RM36 million is for producing quality and excellent films in the future. What reforms have been made in terms of improving FINAS's performance? Secondly, five days ago I read news that the film Abang Adik had won at the 10th Asian World of Film Festival in LA 2024, where the debut direction of Jin Ong had previously won 19 international awards.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

This is a very impressive achievement. Does FINAS provide incentives for winners at the global level, because this proves that Malaysia has great potential and is able to compete on the world stage? I also hope that for the Malaysia Film Festival which will take place on 7 December, my favourite film Imaginur will win, possibly directed by Nik Amir, whom I see has great potential. I would like to ask the Honourable Minister, what efforts has the ministry made to produce more talented female directors, like Amanda Nell Eu who won last year at Cannes for a debut film directed by her. Next, I want to touch on Item 010700 – Information Management and also Item 030200 – Control and Compliance, where Honourable Minister, every Malaysian is obliged to support the government's efforts to ensure that social media is free from elements that can destroy the nation, such as gambling, fraud, human trafficking and other criminal elements. We cannot have tolerance in such matters and that is clear. But we must also remember, Malaysians are also responsible for countering the actions of the Government of Malaysia, which is eager to systematically silence its critics. Never in Malaysian history have the voices of activists, opinion formers, civil movements, and even representatives and former representatives of the people been silenced as is happening under this government. There are social media accounts

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

and their content are blocked from being seen in Malaysia for criticising the government, but strangely no legal action has been taken against them. They are not sued for defamation, nor are they brought to court on criminal charges. It is no secret that this government, which was once led by those who were supporters of freedom of speech and the freedom to criticise the government. So, it is very frightening when we examine the transparency reports by TikTok and Meta, and media freedom indexes prove that the older the Madani Government gets, the more savagely it violates the right to speak. Just look at the TikTok Government Removal Requests Report for the period July to December 2023, the Government of Malaysia recorded a world record, number one, in requesting action be taken against TikTok content and accounts. 27 per cent of the world's requests came from our beloved Malaysia. With a total of 1,862 requests, followed by Australia with 651 requests. Meta, meanwhile, showed that for 2022, there were 515 requests from the Government of Malaysia to take down posts, with only 45 requests in the first half of the year, and increasing in the second half of the year, when the Madani Government was just beginning. Even more shocking, in 2023 the Government of Malaysia's requests soared to 8,580. The Madani Government gave the reason that these requests were only for posts containing various crimes, but Meta – but Meta, I emphasise here. Meta in its report clearly stated that the requests included posts classified as criticising the government. In about a month's time, the Government of Malaysia has the potential to become the government in the world that most violates the right to freedom of speech when the social media licensing is enforced starting 1 January. This licence was introduced without sufficient engagement for a proper consultation process. Initially, all the platforms concerned were urged to apply for this licence without guidelines. After attracting severe criticism from various parties including Meta, the guidelines were introduced. But those guidelines are not only weak, they also open the widest possible space for abuse by the government to silence its critics. Among the things causing public unease about this licence is the kill switch, or in Malay, its "saklar pematinya" or the button to turn it off. Many opinion formers and activists believe that the kill switch in this machine is intended to eliminate content that the government does not like, especially during live streaming. They believe that if the Prime Minister is criticised in a live stream, or the Minister of Communications himself is heated, YouTube and TikTok will not want to stop the stream. The Madani Government itself can stop it. If this concern is true, will this kill switch be used in election campaigns against the opposition? I am nearly finished. Our country is now in a dark era because of this government's greed in silencing the voice of the people. What has happened and what will happen will have a big impact on the nation in the future.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Therefore, I appeal to the Select Committee on Fundamental Liberties and Rights under the Constitution to further assess this social media licence before it is enforced. I ask that the Honourable Minister also pay attention and provide cooperation, otherwise many more, and I fear even more, on 31 December we will go to sleep in Malaysia, and on 1 January 2025 we will wake up in North Korea. Thank you, Masjid Tanah.

Mr ChairmanEN

I invite Bangi.

Thank you Tan Sri Chairman. Assalamualaikum warahmatullahi wabarakatuh. Salam Malaysia MADANI. First, I would like to refer to the operating expenditure which has increased for next year from RM1.0 billion to RM1.07 billion. I will start by referring to Item 030200 – Control and Compliance. We know, as the Chairman has stated in my PAC, that before long, in 2025 or the year, we will have a licensing regime in which social media accounts with eight million users must obtain a licence first. We are also informed that the Online Safety Bill will be tabled to guarantee the safety of social media users, protect children and block harmful content. This means, Tan Sri Chairman, that the role of SKMM will become bigger and more important next year. Therefore, the increase in operating expenditure and so on is necessary. Some parties, as mentioned earlier by YB Masjid Tanah, have expressed concern about several bills and, at the same time, this licensing regime. Therefore, I would like to obtain data from the ministry on the misuse of social media according to elements of offences, for example, if we look at section 233, offences or elements of obscenity, lewdness, offensiveness and so on, and also the number of content takedowns by platform caused by what we call the misuse of social media. Next, I move to Item 020500 – Broadcasting (RTM). I see a significant reduction, from RM551 million for this year to RM441 million for next year. I can say that if we look at the last few years, we see that the quality of programmes and TV broadcasting for RTM has already improved in quality. In fact, it can be said that now it is on par with private TV stations. Therefore, I want to get an explanation from the ministry, why there is such a reduction in allocation, especially under Item 30000 – Assets. I see RTM's assets as very important and able to help RTM deliver programmes in an attractive and professional way. For example, during the National Day celebrations, RTM used a robot, a robot camera that

called AGITO, if I am not mistaken, which is used to record or broadcast the celebration and offers a different perspective from what we usually see. In fact, if we look, many people have praised RTM's coverage during this National Day. I would like to take this opportunity to congratulate and commend all the crew and staff of RTM involved in broadcasting the Independence Day celebrations. I hope RTM can sustain this momentum. Lastly, I refer to Item 020400 – Information Department (JaPen). Specifically, I want to touch on the MADANI Community that has been established throughout the country. I have established cooperation to run programmes together with the MADANI Community in my Parliamentary constituency.

Here I would like to put forward several proposals. Firstly, I propose that more allocation should be given to each MADANI Community to carry out programmes. I understand that at present each MADANI Community is allocated RM10,000, of which RM7,000 is used for programmes and RM3,000 for administrative grants. I propose that the allocation for programmes be increased to RM10,000. So, the total amount given, I propose, is that each MADANI Community receives approximately RM13,000. Secondly, regarding the use of these funds, I understand there are some restrictions, or rather some tightness, where for example, if they want to hold a programme, they must use a vendor from FNB registered with the MoF procurement. I think there should be some flexibility given in the use of these funds, but at the same time, I also want to emphasise that of course audits must be carried out so that we can ensure the use of MADANI Community funds is free from any misuse and so on. So, audits are important, but at the same time, I propose that the conditions for using these funds be loosened slightly. Thirdly and lastly, Tan Sri Chairman, I see that this MADANI Community is usually active, or if we can look at this year alone, active only in the independence month, namely August and September. I propose that the MADANI Community hold programmes more frequently, not only in August and September. I understand that if more frequent programmes are to be held, there must be more allocation. That is why I think my proposal to give more allocation to this MADANI Community should be considered by the ministry. Because I believe that if we truly empower this MADANI Community, it can become a truly effective community-based engagement to provide explanations to the communities throughout the country. With that, Tan Sri Chairman, I conclude my speech and Bangi respectfully supports. That concludes my speech, thank you.

Mr ChairmanEN

Alright, thank you. I invite Kepala Batas.

Dr. Siti Mastura binti MuhammadPAS · PNKepala BatasEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you to Tan Sri Chairman. The first item is 020200 – Strategic and Corporate Communications. We can see that there have been many government programmes involving ministries and the public that have been carried out in efforts to reach out to the public across the country. Kepala Batas wants to know, is there any programme to meet the public carried out by the ministry that involves us, the Members of Parliament from the opposition? For example, YB, if you go out, Kepala Batas, invite the Honourable Member for Kepala Batas to join along with the Honourable Member. What types of creative content of government policy and campaign programmes have been designed since 2022 until now, and what costs have been spent? As Pasir Mas debated just now regarding the video that was edited to the point that the PM appeared to support the existence of Israel as a country, the question is what action has been taken against the international portal journalist? Not only editing what is said to be edited, but even uploading it to its Twitter account. Minister, please explain. Secondly, Item 31001 – National Emergency Call System 999. Tan Sri Chairman, Kepala Batas has experienced and personally witnessed the level of efficiency of this system in several accident situations that affected voters in Kepala Batas itself. For example, a few months ago, it happened at the Guar Kepah exit. The victim suffered severe injuries, covered in blood, an elderly person collapsed when the accident occurred alone. If we look at this matter, what is sad is that after the call was made, the response time from the time of the call was approximately 30 minutes, whereas if we look at the distance, ordinary vehicles would take almost about the same distance. So, Kepala Batas wants to know where the weakness lies there? Residents there then tried to take the initiative to call JPAM for help after nearly 20 minutes without any help arriving. Thus, all matters concerning this victim who needs an ambulance must go through the 999 line. That is what JPAM informed when residents asked for help from JPAM. However, they must still go directly to the 999 line. So, is there any latest operating system or SOP in handling emergencies? Is it because of the new system to be introduced, NG999? The question is, what is the rationale for introducing this new emergency call system to replace the existing system, including the contract signed with TM Technology Services? What are the government's proactive measures to tackle the issue of false emergency calls received through this hotline?

Dr. Siti Mastura binti MuhammadPAS · PNKepala BatasEN

Thirdly, Item 020900 and Item 47000 – National Film Development Corporation Malaysia (FINAS) and Item 53000 – National Creative Industry Policy. Kepala Batas highlights efforts to honour the history of struggle of the Malays and the legacy they have left behind. We have seen how the film Mat Kilau and Panglima Awang sparked love for religion, race, country, and the heritage art of silat that has been inherited by the present generation. In Borneo, Sarawak people certainly know who The Iban Warrior, Temenggong Datuk Kanang anak Langkau is, among the brave fighters who opposed the Communists and who was also previously made into a film. For Kepala Batas, it is time to propose war-themed films, for example Musuh Bisik, which took place at Istana Kuala Kedah, which was attacked by Siam and assisted by British soldiers and supported by traitors. Among the important characters in this film or war, not yet made into a film, are Almarhum Tengku Kudin, Almarhum Sultan Ahmad Tajuddin, Almarhum Tok Moris, Almarhum Haji Muhammad Said, and they were fighters who liberated Kuala Kedah and its districts from the Rattanakosin system government and the British at that time. Kepala Batas feels this proposal is in line with one of FINAS's functions, which is to advise on policies to encourage, preserve and facilitate the advancement of the film industry. Regarding the creative industry, Kepala Batas wants to know how far local dramas and films have succeeded in being marketed on international platforms? If we look at Outcome 3 related to the topic raised, a total of 25 productions are targeted for 2024 and also 25 productions for 2025. Is there any criteria or condition for a production to be given funds or incentives to penetrate international platforms? Could films on the nation's historical and cultural heritage be given more opportunities in future? Kepala Batas wants to know, how many applications from international productions wishing to carry out filming and performances have been approved and rejected since 2023 until now? Have there been any changes to the guidelines for organisers and artists who wish to carry out filming or performances in this country? With Tan Sri Chairman's permission, 30 seconds. Lastly, Item 050300 – RTMKlik. It cannot be denied that this online portal has brought a new dimension to RTM in audience reach. However, Kepala Batas would like to request details of the RM37 million allocation provided for 2025 compared to zero last year, 2024. Is there any purchase of assets or improvement of broadcast quality? If yes, who will manage it? For the management and implementation of this RTMKlik, are there other parties also involved? Please clarify. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Alright, I invite Pasir Gudang.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Bismillahi Rahmani Rahim. Good afternoon. Tan Sri Chairman, I want to debate only one item, namely Item 31003 – National Digital Network (JENDELA). JENDELA, or the National Digital Network, is a comprehensive digital infrastructure provision plan aimed at providing quality fixed and mobile internet services to users. JENDELA was developed while our country Malaysia was preparing for 5G technology. Tan Sri Chairman, so regarding this 5G technology, I have several questions for the Honourable Minister. Firstly, is it true that during the implementation of the first 5G network by DNB, the government at that time, the Perikatan Nasional Government led by the Honourable Pagoh, the Eighth Prime Minister, allocated government funds, people's money, amounting to RM16.5 billion? So I want to know, is this true? Secondly, if it is true that this fact allocated the development of the 5G network for a period of 10 years, then so far, how many billions have been used and how much balance remains?

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Is it true what people say, that RM4 billion has been used and there is still a balance of RM12.5 billion? So, I ask the Minister to explain in this House, this Parliament. Thirdly, has DNB's expenditure on the first 5G network been audited by the Auditor General? Fourthly, does the Honourable Minister agree that the Auditor General's Report on the RM16.5 billion, the first 5G, if true, will be tabled in Parliament and debated later? Fifthly, the Honourable Minister told Parliament last week that the award of the second 5G network spectrum to a telecommunications company, U Mobile, did not involve government money, did not involve tax payer money. My question is, why could the government of the Tenth Prime Minister, the Honourable Tambun, launch the second 5G network without involving national money, government money, but the government of the Eighth Prime Minister, if indeed it had to spend up to RM16.5 billion of people's money, taxpayer money, had to do so? Sixthly, did the Fourteenth Parliament's term approve the RM16.5 billion? Seventhly, was the RM16.5 billion approved by the Cabinet while Parliament was suspended for six months, is it true or not? Eighthly, if the answer is yes, did the government during that emergency commit an abuse of power, unconstitutional, imprudent, dishonest, a crime and a serious financial scandal? So, I propose that if what I say has merit, I ask PDRM Commercial Crime and SPRM (Malaysian Anti-Corruption Commission) to investigate this matter.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Tan Sri Chairman, I ask the Honourable Minister to provide an answer in this House without fear and favor, for the nation. Thank you. I support Tan Sri.

Mr ChairmanEN

Alright, thank you. I invite Langkawi.

Assalamualaikum Tan Sri, thank you. I refer to 020500 – Broadcasting (RTM), but before that Tan Sri, allow me to refer to my friend from Bangi earlier who congratulated RTM for its success. I went straight into this search and it turns out the people are still not satisfied, Honourable Bangi. He said the quality and relevance of the content are not attractive and not relevant to the needs of the young generation compared with private channels. Then, he also said that access and technology, some users complained about technical issues such as weak signal coverage in certain areas. Then thirdly, I will take just three, there are many friends from Bangi. Funding and effectiveness, other criticisms touch on the use of public funds to support RTM's operations. This is the interesting part. Meanwhile, audience acceptance is said to be out of balance with the expenditure given by the government. Referring to 020500 – Broadcasting (RTM) amounting to RM441 million. Every year, RTM receives such a high amount. However, it is very regrettable, Tan Sri, because recently it was circulated and we feel sorry because of the delay in paying contract workers or piecemeal workers, as widely reported in the media. And we- this matter, I think, should not have happened to RTM because they, as the Honourable Bangi said just now, work hard to uphold RTM's name. Secondly, Tan Sri, we see that RTM or TV stations abroad, for example BBC in the United Kingdom, CNA backed by the Singapore Government, Anadolu backed by the Turkish Government, WION by the Indian Government, and their televisions have become the mouthpiece or voice of top leaders, government propaganda voices. I strongly believe and am convinced that RTM is also one of the government's propaganda tools, and I would like to ask when on earth RTM will follow in the footsteps of these countries, so that the shouts of the Honourable Tambun, for example against Israel, for example joining BRICS and others, can be broadcast around the world so that they know that this is our great PMX who opposes genocide in Gaza? I believe, if we look at BBC, CNN and others, they have conquered every corner of the world. So, RM67 million is given to Bernama, and I strongly believe and am convinced Bernama has staff overseas, but what has Bernama broadcast to us all this time? Then, Honourable Tan Sri, I feel it is high time for RTM to report directly from Gaza, for example, to report directly to us from America, for example, in Bahasa Malaysia so that all Malaysians understand what is happening or developments in the world.

Item 030000 – Infrastructure and Telecommunications. I congratulate this infrastructure and telecommunications, as much as RM80.4 million has been channelled for telecommunications infrastructure. I would like to ask the Honourable Minister, be honest with us, with respect. How much is going to be given to Langkawi to expand? For example, in Pulau Tuba, it is even difficult to get WiFi. Pulau Tuba is the second island of Langkawi that tourists visit, but access is extremely difficult. Then, telecommunications issues also linger, internet connectivity and coverage in transition to 5G technology. Many residents report inconsistent internet speeds between different service providers, as I said earlier. Tan Sri Yang di-Pertua, lastly, Item 31003 – National Digital Network (JENDELA). As brought up by Pasir Gudang earlier, RM830 million to improve communications infrastructure. It faces critical challenges regarding project implementation, technical obstacles and operational inefficiency that require immediate attention to achieve its objectives. I also agree that if RM16 billion has already been handed over, we also need to know to what extent this RM16 billion has been used. Thank you, Tan Sri Yang di-Pertua.

Mr ChairmanEN

Alright, I invite Kudat.

Thank you, Tan Sri Speaker, and thank you because I see Tan Sri Speaker, although not really well, still remains steadfast with us in the House... [Applause] Thank you for this opportunity. Kudat would like to ask the Honourable Minister about several items.

The first, Item 060500 – TV Broadcasting Programme, Item 020500 – RTM, Item 020400 – Information Department, Item 020200 – Strategic and Corporate Communications. What are the government's findings in efforts to tackle the issue of child grooming through social media platforms and also the issue of child pornography, as well as government initiatives in terms of public information? In line with the passage of time and technological advancement, where society is shifting to mobile devices, what are the government's efforts to increase engagement of TV broadcast programmes, particularly in aspects of unity and harmony? Tan Sri Chairman, next, Item 030000 – Infrastructure and Telecommunications be read together with Item 030100 – Infrastructure, Item 030200 – Control and Compliance. There is a problem of weak signal drop calls, especially while travelling, whether on highways or in villages. Even in the KL area itself, drop calls often happen, let alone in rural areas. For example, in the Parliamentary constituency of Kudat, in Banggi, Pitas, many areas have no coverage at all. Although there are areas that already have

telecommunication towers, there is still no coverage until now. For example, in Kampung Loro in Kudat and also in Pantai Kelambu. Is the ministry prepared to impose penalties and ensure a higher level of accountability on telco companies to improve service quality and user satisfaction? Perhaps we can use a score card based on complaints obtained from users. That is all from me, Tan Sri. Thank you.

Mr ChairmanEN

Alright. I invite Padang Besar.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you to Tan Sri Chairman for the space and opportunity to debate the committee for the Ministry of Communications. Firstly, I express my thanks and high appreciation to the Honourable Minister and the ministry for their cooperation on the Bandar Teknologi Maju Perlis, where the new Honourable Minister recently came to Perlis, with permission, to become a game changer in the state of Perlis, or one who changes the situation in the state of Perlis, a project to lift the state of Perlis on the world map in relation to the Data AI project. Referring to the Federal Budget Estimates Book 2025, Programme 3: Infrastructure and Telecommunications, comprehensive digital communications coverage under Item 030000 – Infrastructure and Telecommunications. I take the scope relating to frequency sovereignty at our national borders, particularly Padang Besar. Until now, we have still not succeeded in curbing signal intrusion from Thailand, from both the commercial and security aspects. Although my debate is technical in nature, perhaps it is worth informing the Honourable Minister, regarding frequencies between defence and also frequencies for public use. Everyone knows Malaysia is moving towards a 5G nation, with one more service provider having been finalised. The Malaysian Communications and Multimedia Commission (MCMC) has allocated the 700 megahertz, 3.5 gigahertz and 26 or 28 gigahertz spectrum for the implementation of 5G in the commercial sector. In line with that, our defence system is also modernising its assets through the purchase of high-technology radar. What concerns me is that, through a review, it was found that Malaysia's defence radar is still tuned to frequencies of 2.9 to 3.2 gigahertz. Will there be an overlap effect between commercial frequencies and the frequencies used by the Ministry of Defence (MINDEF)? I strongly agree with the action of MCMC in gazetting the National Spectrum Plan, and it must be a collective reference, regardless of whether from the government or commercial service providers. If we look closely, the radio spectrum uploaded on the website

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

MCMC surely, at a glance, sees that our airspace is already crowded with those frequencies. Figuratively, if it were manifested, it would be like the network of highways in the Klang Valley that criss-cross. It is a good thing we cannot see those frequencies. Border sovereignty and border security need serious attention. To what extent, and how many times, have serious consultations been held between the Ministry of Communications and MINDEF, the Ministry of Home Affairs (KDN) and other agencies on this issue? I have received information that just recently- I have received information that there once was an incident in which an air defence radar at a location in the south of the country had to be powered down, with permission, due to causing interference to Singapore's communications network. This situation is very worrying because it affects the radar's ability to operate optimally to defend the nation's airspace. Our neighbouring country uses the L-band to avoid frequency interference. Why do we still use the S-band? Although the procurement of military and defence assets of the nation falls under another ministry, the frequencies and spectrum fall under the Ministry of Communications. S-band radar operating in the frequency range of two to four gigahertz is often the choice for defence. However, it has a significant weakness. These frequencies are too close to public communication systems that we commonly use, namely WiFi 2.4 gigahertz and also Bluetooth, besides satellite technology and amateur radio. When this radar emits strong signals without strict control, electromagnetic interference may occur, which ultimately damages the stability of public communications. What is more, it has an additional weakness because its frequency range is too narrow, making it an easy target to be jammed, with permission, by the enemy. This raises the question: is S-band radar still appropriate for military applications? Or is it time for us to consider other options that offer wider bandwidth and are resistant to external interference. The risk of public communication interference. This S-band radar is not only at risk of exposure to enemy threats, but also causes interference problems for public communication systems. There are several key challenges, among them spectrum close to public telecommunication systems. S-band radar shares spectrum close to public telecommunications such as Wi-Fi and Bluetooth. If the radar signal is too strong or not properly arranged, electromagnetic noise can disrupt the smooth running of public services, including WiFi connections and smart home technology. Finally, steps need to be taken to prevent incidents in which national defence communication equipment fails to function in emergencies, especially at the Padang Besar border, which is also related to public and commercial telecommunication systems. A value for money approach, with permission. I wish to emphasise that every allocation must provide the best returns to the people. Investment in technologies such as radar and spectrum management must enhance national security without compromising public well-being. If such investment provides clear benefits,

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

we need not hesitate to spend appropriately. I agree if the ministry spends more for that purpose. Tan Sri Chairman, the issue of frequency spectrum is a complex but important challenge. With proactive steps such as spectrum coordination and investment in precise technology, I am confident Malaysia can maintain its frequency sovereignty while ensuring a balance between security and public communications. That is all, thank you.

Mr ChairmanEN

Good. I invite the last debater, Pekan.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh, peace and well-being, Malaysia Madani greetings. Thank you, Tan Sri Chairman. I will go straight to Item 020000 – Strategic Communications and Creative Industries with an allocation of RM773 million and Item 020400 – Information Department (JaPen) with an allocation of RM171 million. The core of this debate emphasises matters relating to the misuse of social media that leads to acts of cyberbullying. Cyberbullying is a form of act that intimidates, causes anger, damages the reputation and humiliates a person through various communication and media platforms such as social media, websites, text messages and so on. Records relating to cyberbullying, according to MCMC, recorded a total of 8,339 reports and complaints, or 27 cases a day, for the period from January to 1 November 2024.

At this time there is no specific Act or legislation regarding cyberbullying. Instead, cases involving the issue of cyberbullying are only covered under existing general legislation, among them Act 574, the Communications and Multimedia Act 1998, section 211 and section 233 of the Communications and Multimedia Act 1998, and the Computer Crimes Act 1997. As an example, in the case of A. Rajeswary or Esha, July 2024 was when a bullying victim passed away. After her death, which became a matter of public concern, two individuals alleged to be linked to her death were brought before the court. They are alleged to have uploaded offensive and defamatory content in the form of threats and intimidation, and to have used vulgar and obscene language against Esha, who was alleged to be among the causes of her death. However, what has become a matter of public dispute is that although they pleaded guilty to the charges, they were only given light punishment. For example, P. Shalini was charged under section 14 of the Minor Offences Act 1955 and she was only sentenced to a fine of RM100 and subsequently released. This is among the main factors why cyberbullying should be eradicated as fiercely as possible, and why minor cyberbullying laws should also be implemented. Acts that encourage and create such hatred should be abolished.

Therefore, I urge the ministry to expedite the process of drafting a new bill specifically on cyberbullying as an initiative that demonstrates the ministry's seriousness in tackling the issue of cyberbullying and ensuring that severe and appropriate punishment is imposed on offenders. I also wish to propose that the ministry also place accountability on social media platform providers involved, such as Facebook, Instagram and TikTok, so that they are more alert to the issue of cyberbullying occurring on their platforms, in addition to strengthening security controls on those platforms so that such incidents do not occur or recur. At the same time, I would like to know what initiatives the ministry has to encourage victims of cyberbullying to come forward and take legal action so that the bullies can be tried and given the appropriate punishment. What cross-ministry efforts are there to assist cyberbullying victims who face 'kejejasan' in mental health in order to prevent other undesirable matters from occurring. Cyberbullying can be considered a security threat risk today. Therefore, the ministry needs to tighten laws relating to cyberbullying, including in terms of the definition of cyberbullying, fines and also appropriate punishment. The issue of bullying should not be taken lightly because it can cause psychological impact that can threaten a person's safety and life. Firm action must be taken to tackle it because it has no limits, can happen at any time, and can potentially be carried out by anyone, including unknown individuals. Thank you. Pekan seeks support.

Mr ChairmanEN

Good, thank you. I will invite the Minister to respond for 20 minutes; 13 Members of Parliament have already taken part. Minister, please proceed, 20 minutes.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications · Lembah PantaiEN

Thank you, Tan Sri Chairman. Before I begin answering the questions and issues raised by the Honourable Members, I take this opportunity to record my condolences to the family of the late Khairul Azli bin Rahim, who was Head of the ASEAN Desk, International Relations Section, Strategic Development Division of RTM, who passed away just now. So I am very affected, because in the past week so many media friends have been affected, some have passed away. Some have lost their jobs, and as someone who, before becoming a Minister, before becoming a Member of Parliament, I often fought for the welfare, including the wellbeing of journalists and media friends. I am very, very affected and I extend my condolences to the family of the late. Tan Sri Chairman, I take this opportunity to thank the 13 Members of Parliament who have debated. I will try to summarise according to

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications · Lembah PantaiEN

topic, because there are several topics that are repeated. I thank all friends who have debated and given criticism, views, advice and suggestions to improve, especially the quality of services. For example, RTM. Certainly, with the Director-General of Broadcasting at this time, we are striving with all our might to improve quality, whether in terms of content or programming, and also the technical aspects. I myself receive feedback from time to time after official events such as the National Day celebrations. Some have expressed and recorded their thanks to the RTM team, especially the camera operators who were able to capture various actions that were truly amazing, including the fire brigade and also those who ride vehicles during the parade. So some were amusing. Some truly raised patriotic feelings among the people. So I thank you, and God willing we will consider the suggestions, including examining what we can do to ensure that in vernacular languages, more content provided by RTM reaches the community. So I take note of what was conveyed by the Honourable Member for Segamat just now. Regarding – I will touch on it briefly, one content produced through RTM programmes every night at 7.59, a segment provided, namely the segment Biar Betul. Examining anything found to be inaccurate in information, content or defamatory, and correcting it. So I recommend that Members of Parliament watch every night, 7.59 pm, and also on the various Biar Betul social media accounts. This has been carried out since last year on the instructions of the Honourable Member for Hulu Langat, but she is not here. So on her instructions. If she, she wanted Fitnah Apa Hari Ini? But we have implemented the Biar Betul segment, however, we found that much of the material being spread now is spread more through WhatsApp. Therefore, the MCMC has informed that this January, a chatbot on WhatsApp will finally be launched to assist all users who use the WhatsApp application to send messages they suspect to be false or have dubious elements for verification through the use of AI. So, God willing, we will inform the Honourable Members so that they can make use of it later. Regarding the National Day celebrations and also Malaysia Day, thankfully, we will see a slight improvement. For everyone's information, indeed the Opposition bloc was invited to send a representative, and the one invited was the Leader of the Opposition. I have obtained confirmation from the Secretary-General of the Ministry, and indeed the Special Officer to the Secretary-General has been in contact with the Private Secretary to the Leader of the Opposition repeatedly to invite him, but there was no positive response. I hope that for the National Day celebrations in 2025, God willing, if I am directed to lead it, I request that the Leader of the Opposition

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications · Lembah PantaiEN

attend, so that we can show a spirit of togetherness, especially on important days such as National Day and also Malaysia Day.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications · Lembah PantaiEN

So, for both these events, the Opposition representative was invited and the one invited was the Leader of the Opposition. I confirm this. I will return briefly to the issue of RTM. Many Members of Parliament, including Pasir Mas and several others, raised the issue of part-timers or piecemeal workers. That is what was mentioned. So, RTM has informed that this isolated case involved a piecemeal staff member who only started in October, and there were some processes to make, with permission, a claim, but some documents were incomplete. So, that matter has been dealt with and I understand the person has received their salary. So, I do not want us to discuss it as if this concerns only one individual. At the same time, there was indeed some delay before this, but that was more related to a Circular that had been issued, and that matter has also been handled internally. So God willing, we will ensure that those involved, including part-timers and also those working as piecemeal workers for RTM, their livelihoods and welfare will always be looked after. I touch on the National Journalists' Day Programme (HAWANA). The Honourable Member for Tasek Gelugor raised the matter of journalist friends who have not been paid for months. I personally followed this matter, and I personally helped, both, with permission, both personally and also through the Tabung Kasih@HAWANA. So, Tabung Kasih@HAWANA is not only during Journalists' Day, but can be used at any time to help journalists who face any kind of difficulty. So, it has been provided and delivered. At the same time, regarding the portal that was mentioned, I have also been in contact with the Chief Editor, with permission, the Editor-in-Chief, and he informed, among other things, that because this matter has been raised repeatedly in this august House, there will be a meeting tomorrow with the management to ensure the issues raised are dealt with promptly. I will continue to monitor and of course the Minister of Human Resources will also examine to ensure the welfare and rights of workers, including journalists, are protected.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

Minister, just a little. Can the Minister give an assurance that the owners of those three portals will be treated like all the- owners of other companies if they do not settle all the compulsory contributions?

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Yes. That is honestly so. Although I am smiling on the outside, inside my heart, fire is burning in an extraordinarily intense way because I know these journalist friends, all of them, are my friends. So I am very, very disappointed, and I ask those who are watching, if there are any journalists

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

who are facing difficulties, and we know that lately many journalists are facing issues and problems.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Honourable Minister, may I add just a little? Regarding these journalists, so that we can give confidence. Can the ministry set up a direct link to contact them so that they can have a direct access to the ministry, instead of us going around here and there so that we can address the issues of these journalists in a - This shows the honesty of the Honourable Minister. Thank you.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Ya, saya bagi peluang terakhir. So, saya akan tunggu sampai esok. Saya nak tunggu, saya nak dengar apa kata Ketua Editor tersebut dan saya akan susuli. Ada beberapa tindakan, tapi tindakan yang kita ambil perlu berlandaskan, berlunaskan undang-undang dan tidak boleh melangkaui bidang kuasa yang ada pada kita. Jadi, saya akan teliti perkara ini dan saya akan uruskan insya-Allah sebaik mungkin. Mengenai isu yang dibangkitkan the Honourable Member for Masjid Tanah mengenai filem "Abang Adik" yang FINAS telah mengangkat sebagai filem mewakili Malaysia di Oscars dan memang pihak FINAS ada menyediakan bantuan melalui beberapa dana yang ada. Kita sedang meneliti kerana kita dapati bila filem-filem ini bukan hanya bertanding dalam pertandingan seperti Oscars, mereka bersedia. Kami dapati termasuk dengan pembikin filem seperti Amanda Nell Eu yang telah menghasilkan filem "Tiger Stripes" dan membawa ke Cannes. Mereka bersedia untuk membawa, tetapi bila mereka sampai ke sana, banyak kos yang mereka tak sangka terpaksa mereka tanggung. Sama juga dengan filem "Abang Adik". Jadi, pihak FINAS sedang meneliti perkara ini. Saya telah minta supaya kepada mana-mana filem yang akan dipertandingkan di festival antarabangsa, mereka juga faham bahawa kerajaan boleh membantu setakat ini, tetapi secara realistiknya, untuk setiap round di mana mereka terpaksa melakukan pemasaran di festival-festival itu, mereka lebih bersedia. Jadi, insya-Allah kita akan teliti perkara ini dengan lebih mendalam dan lebih menyeluruh dan kita hendak supaya filem-filem Malaysia dapat bertanding, tapi mereka juga bersedia untuk bertanding. Jadi, bukan sekadar kita boleh mengumumkan bahawa inilah filem yang masuk ke Oscars, Cannes, pergi ke Rotterdam dan sebagainya, tetapi mereka benar-benar bersedia...

Ya, saya.

Terima kasih Menteri. Saya juga telah bangkitkan dalam perbahasan saya. Saya mendengar ulasan bahawa Menteri dan Timbalan Menteri dan kementerian adalah sungguh prihatin tentang nasib yang dihadapi oleh wartawan-wartawan. Dalam konteks ini, saya cuma ingin menggunakan kesempatan ini untuk mengulangi semula kerisauan saya tentang apa yang telah berlaku kepada dua orang wartawan MalaysiaKini, S

Vinothaa dan B Nantha Kumar dan saya ingin menggunakan kesempatan ini untuk menyeru Menteri untuk menggunakan kementerian. Walaupun isu penguatkuasaan dan tindakan memberi perlindungan kepada mereka terletak kepada Ministry of Home Affairs (KDN), cuma sebagai kementerian, saya berharap Menteri dapat menggunakan kesempatan ini untuk berbincang dengan Ministry of Home Affairs (KDN) untuk memberi perlindungan kerana ini adalah sesuatu yang tidak boleh diterima...

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Okay, okay. I understand.

Terima kasih.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

I understand. Isunya ia bukan dalam- saya tidak ada punca kuasa. Saya tidak ada akta khusus untuk memberi perlindungan seperti yang diminta oleh Jelutong tapi saya faham. Saya dan the Honourable Deputy Minister, kami konsisten dalam pendirian bahawa para wartawan mempunyai hak untuk membuat pelaporan. Mereka mempunyai hak untuk merahsiakan sumber dan ini kami jelaskan berkali- kali dan kami tidak akan berganjak dalam perkara ini. Sekiranya ada mana-mana wartawan yang merasakan diri mereka tidak selamat setelah mereka membuat sebarang pelaporan, mekanisme yang pertama, buat Laporan Polis dan yang kedua, boleh berhubung dengan kami. Saya, the Honourable Deputy Minister dan kita akan cuba teliti isu-isu yang dibangkitkan dan pastikan bahawa mereka sebanyak yang mungkin dalam lingkungan undang-undang mendapat- boleh dikatakan mungkin bukan imuniti, bukan kekebalan tapi hak mereka terbela...

Terima kasih Menteri, terima kasih.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Saya pergi kepada perkara yang dibangkitkan juga oleh the Honourable Member for Masjid Tanah dan saya cukup berterima kasih atas isu yang beliau bangkitkan, juga Pasir Mas dan beberapa rakan-rakan yang lain mengenai kegusaran di kalangan Ahli Parlimen tentang proses pelesenan. Saya rasa untuk mengatakan pada 1 Januari, kita akan menjadi Korea Utara, itu adalah, with permission, hyperbole. Itu adalah yang agak luar biasalah dan bagi saya, sangat tidak adil kerana Malaysia selama ini kita telah mengamalkan satu sikap yang baik. Setakat ini tidak ada netizen yang ditangkap seperti mana yang berlaku dulu, ada netizen yang mengingatkan bila beliau memasukkan Tweet tentang MySejahtera, esok lusa, dah kena tangkap. Kali ini tidak berlaku keadaan seperti itu. Kita telah berjaya beredar dari zaman edan pada ketika Parlimen itu sendiri ditutup. Jadi, kalau nak kata nak buat perbandingan dengan Korea Utara, bilakah zamannya? Jadi, tak apalah. Saya ambil maklum pandangan Yang Berhormat dan sejujurnya saya dan the Honourable Deputy Minister juga MCMC sedia untuk mengadakan lebih banyak perbincangan dengan Ahli-ahli Yang Berhormat, termasuk rakan-rakan daripada pihak pembangkang untuk memahamkan. Niat kita tidak lain, tidak bukan Tan Sri Chairman, bahawa pihak Criminal Investigation Department (JSJ) dan juga Commercial Crime Investigation Department (JSJK) telah memberi satu laporan yang

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

cukup menggusarkan bahawa jenayah sedang dan telah berhijrah secara massa ke dalam media sosial. Kita lihat kesan daripada kebanjiran kandungan sama ada scam, with permission, ataupun judi dalam talian.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Ini berlaku paling banyak dalam platform Facebook. Jadi sekiranya ada Ahli Yang Berhormat yang mempertahankan Facebook contoh ataupun Meta sukacita saya maklumkan di sini bahawa setakat hari ini jumlah kandungan yang diminta oleh MCMC untuk diturunkan daripada Facebook secara keseluruhan adalah 249,268 kandungan. Saya sebut sekali lagi 249,268 kandungan. Daripada Facebook sahaja, jumlah kandungan perjudian online gambling berjumlah 172,072, manakala jumlah kandungan scam 56,136. Menjadikan jumlah ini adalah 91.6 per cent daripada semua kandungan yang diminta oleh MCMC untuk diturunkan daripada Facebook. Jadi, the overwhelming majority Tan Sri Chairman, with permission, daripada kandungan yang diminta oleh MCMC untuk diturunkan oleh platform-platform ini adalah bersifat scam dan judi dalam talian. Belum lagi kandungan yang seperti pelacuran, seperti iklan produk perkhidmatan yang tidak dibenarkan dan isu-isu yang sewaktu dengannya...

Menteri, Bangi.

Mr Chairman

Bangi.

Bangi, ya.

Menteri, terima kasih. Tadi Menteri sudah buka sedikit pintu itu. Saya pun tadi dalam perbahasan saya, saya minta disenaraikan jumlah yang diminta untuk diturunkan.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Baiklah. Saya ....

Saya fikir kalau tidak boleh bagi secara lisan pun, mungkin secara bertulis, Menteri. Terima kasih.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Sebab angka-angkanya sangat menarik dan saya rasa wajar untuk kita tunjukkan kepada umum. Saya sebut di sini mekanismenya pada waktu ini ialah MCMC tidak boleh mengarahkan kerana kita tidak ada kuasa itu dan MCMC hanya meminta kepada platform untuk diturunkan. Terpulang kepada platform untuk menurunkan.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Yang Berhormat Menteri, saya hendak tanya tadi yang figure yang telah pun Yang Berhormat Menteri nyatakan tadi, boleh tidak kita tahu itu dari tahun berapa ke tahun berapa?

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Untuk tahun ini sahaja.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Untuk tahun ini dan sebagaimana yang saya nyatakan tadi, laporan Meta itu menyebut bahawa permintaan itu termasuklah hantaran yang diklasifikasikan sebagai mengkritik kerajaan. Jadi bagaimana saya hendak tahu respons Yang Berhormat tentang perkara tersebut. Adakah benar ataupun tidak?

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Untuk makluman Ahli Yang Berhormat, bukan semua permintaan yang datang kepada MCMC itu datang daripada saya. Aduan kepada MCMC boleh dibuat oleh sesiapa sahaja. Saya tidak dimaklumkan dan MCMC tidak meminta saya untuk pengesahan sebelum mereka mengambil tindakan kerana mereka ada kuasa untuk berhubung dengan platform-platform ini. Seperti dalam kes Royal Malaysia Police (PDRM), saya tidak berhasrat...

Yang Berhormat....

Bagi saya....

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

...Sebab kita tengok sekarang ini suara rakyat dibisukan dan kita ada data bahawa request tersebut, permohonan tersebut adalah datang daripada kerajaan sendiri.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Ini tidak benar.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Dari kerajaan sendiri.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Saya jelaskan di sini, perkara ini tidak benar.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

So, Yang Berhormat kata, tak benarlah?

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Sekiranya sesuatu kandungan itu diturunkan, maka platform tersebut mengaku bahawa kandungan itu melanggar community standard, with permission, platform-platform tersebut. MCMC akan memanjangkan aduan yang diterima daripada sesiapa sekalipun. Bukan saya. Daripada jumlah yang saya sebutkan tadi itu 172,000, 56,136 untuk makluman the Honourable Member for Bangi. Ya, insya-Allah kita akan terbitkan. Untuk makluman, bukan hanya Bangi, tetapi juga Dewan ini bahawa angka-angka ini sangat-sangat mengejutkan. Jadi kita akan maklumkan dan saya akan sediakan dalam format yang mudah untuk diteliti dalam semua platform, insya-Allah.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

Menteri, sedikit sahaja. Saya sebenarnya hendak dengar jawapan pasal DNB tadi, tetapi Pengerusi, saya just hendak sebut bahawa saya dengar banyak kali Menteri kata, "Bukan arahan Menteri, tetapi MCMC buat." Tidak kiralah sama ada arahan Menteri atau tidak, kalau dilakukan oleh mana-mana agensi kerajaan, Menteri bertanggungjawab. Jadi, tidak boleh lari daripada tanggungjawab itu dengan memberikan alasan sebegitu. Jadi kalau MCMC buat, maka the responsibility to answer is from you, with permission Tuan Pengerusi.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Itulah jawapan saya.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Maksudnya laporan daripada Meta itu transparency report daripada Meta itu maksudnya salah ataupun betul, saya hendak tanya.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Dia, saya bagikan konteksnya Ahli Yang Berhormat.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Betul ataupun tidak? Hendak tahu itu jer.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Ya, saya akan jawab. Isu pada hari ini untuk makluman Ahli-ahli Yang Berhormat, bila kita sebut tadi tentang rakan-rakan media yang paling terkesan sekarang ini akibat daripada penghijrahan dana advertising expenditure (ADEX) daripada media kepada media sosial- saya sebutkan perkara ini sebagai konteks dan sebagai latar belakang kepada apa yang sedang berlaku sekarang. Kita dapati berdasarkan maklumat dari Commercial Crime Investigation Department (JSJK) pada tahun lalu, RM432 juta duit rakyat Malaysia telah hilang akibat scam dalam platform Facebook sahaja. Berdasarkan maklumat yang kita terima, Facebook telah meraih keuntungan dari Malaysia sebanyak RM2.5 bilion hasil daripada jualan seperti yang saya sebutkan tadi. Iklan- iklan yang kita minta diturunkan termasuk Ahli Yang Berhormat dari Seputeh bila wajah beliau disalahgunakan untuk menjual investment, with permission. Jadi saya sebut di sini- ya benar kerajaan khususnya saya, harus bertanggungjawab atas tindakan yang diambil dan saya tidak lari daripada tanggungjawab itu. Kebebasan bersuara memang ada dan memang termaktub dalam Perlembagaan, tetapi kebebasan yang tidak berbatas dan apa yang kita sebut sebagai kebebasan yang mutlak akan mengundang malapetaka. Kritikan itu kita terima. Perdana Menteri juga tidak menghalang sesiapa daripada mengkritik, tetapi sekiranya kritikan itu asasnya adalah fitnah belaka. Contoh dalam kes yang dibangkitkan oleh Menteri Dalam Negeri, fitnah yang mengatakan bahawa 1.2 juta rakyat China telah mendapat kewarganegaraan, di mana Ahli-ahli Yang Berhormat mempertahankan bila Menteri Dalam Negeri berkata bahawa fitnah ini berlegar dan Ahli-ahli Yang Berhormat yang membangkitkan fitnah itu!? [Berucap dengan nada tegas] Jadi kritikan seperti itu – Saya minta maaf ya. Hujung hari dan hendak masuk Maghrib...

Cool down, cool down. Bertenang, bertenang Menteri. Bertenang.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Saya bertenang, baik, tetapi yang saya sebutkan itu adalah contoh yang paling drastik- kritikan. Jadi jangan berselindung, jangan cuba melindungi: pertama, pemfitnah dengan menggunakan label pengkritik. Kita harus bezakan pemfitnah dan pengkritik...

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Soalnya hari ini suara rakyat 'dibisukan' Yang Berhormat. Dulu Yang Berhormat juga yang lantang mengkritik.

Tidak benar.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

...Tentang memperjuangkan hak kebebasan bersuara rakyat.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

I stand dalam hal ini. Suara rakyat...

Mr ChairmanEN

Elok-elok kalau Masjid Tanah...

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Itu sahaja- hendak mengingatkan balik.

Mr ChairmanEN

Masjid Tanah, minta kepada saya dahulu. Minta dahulu ya. Saya bukan hendak kata apa-apa sebab saya dah rasa elok kita buat elok-elok. Tadi elok sudah, tetapi now better that you respect me, I respect you. Okay, please proceed.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Baik, jadi saya nak sampai ke penghujung cuma kalau nak kata suara rakyat dibisukan, bukan pentadbiran ini, bukan Perdana Menteri ini yang tutup Parlimen Yang Berhormat... [Tepuk] Bukan. Jadi ingatlah, beringat-ingatlah apa yang berlaku dulu. Baik saya ke topik yang terakhir walaupun Pasir Gudang meminta berkali-kali isu dan juga Ahli-ahli Yang Berhormat membangkitkan tentang isu DNB. Sebenarnya DNB bukan di bawah jagaan saya. DNB telah dipindahkan kepada Ministry of Digital. Jadi apa yang mungkin yang Yang Berhormat bangkitkan itu lebih baik sekiranya ia dijawab oleh Menteri Digital, tetapi ada beberapa perkara yang saya boleh nyatakan di sini sewaktu saya mengambil alih portfolio ini yang agak menyeramkan dan agak mencemaskan pada ketika itu Tan Sri Chairman, yang mana kita dapati ia seperti tidak ada sesiapa dalam kementerian ataupun dalam MCMC yang mengetahui sebarang perkara yang berlaku dalam DNB pada ketika saya mengambil alih. Kontrak-kontraknya, angka-angka yang disebut itu. Pada waktu itu Timbalan Ketua Setiausaha Perbendaharaan yang sekarang ini Secretary General of the Treasury sendiri tidak mempunyai dengan izin, any visibility tentang apa yang berlaku dalam DNB walaupun DNB itu adalah sebuah syarikat di bawah Minister of Finance (Incorporated) (MKD). Jadi saya tidak boleh lebih dari itu kerana saya hormat apa yang disebut sebagai Ministerial Function Order (MFO), tetapi sewaktu ia di bawah jagaan saya, itulah antara perkara yang kita teliti. Sudah pasti apa yang sedang berlaku sekarang ada satu seperti yang dibangkitkan oleh Ahli-ahli Yang Berhormat, Tasek Gelugor menyatakan, saya pun tak tahu Yang Berhormat bahawa wakil U-Mobile telah meletakkan jawatan sebab DNB bukan bawah jagaan saya dan saya tidak dimaklumkan.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

Tetapi just Pengerusi, kalau dibenarkan Menteri. Mengenai yang ditimbulkan oleh Pasir Gudang, saya rasa itu satu komen yang berat sebenarnya dan saya petik daripada laman web DNB, jumlah kos pelancaran 5G akan dibiayai secara eksklusif oleh sektor swasta tanpa melibatkan pembiayaan kerajaan atau perbelanjaan pembangunan. Jadi yang disebut oleh Pasir Gudang tadi saya hendak rekodkan bahawa premis awalnya daripada nombor satu tadi itu sudah salah. Maka soalan-soalan selanjutnya itu pun jadi tidak relevan kerana semuanya tidak dibiayai oleh kerajaan mengikut data DNB sendiri, tetapi mungkin besok bila perbahasan digital lebih tepat untuk dibincangkan perkara ini Tuan Pengerusi.

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Cuma saya mengambil tanggungjawab untuk menguruskan pastikan daripada segi liputan kawasan berpenduduk (COPA) capai 80 peratus. Selepas kita capai, niat saya walaupun kita telah beralih kepada dwi rangkaian adalah untuk memastikan DNB ini mampan, sustainable, tetapi isu-isu yang dibangkitkan itu

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

sekiranya pihak PAC sebagai contoh ingin meneliti dan kini sudah pasti Auditor General boleh meneliti setelah kita pinda Akta Audit, kita serah kepada siasatan-siasatan dan sekiranya ada mana-mana pihak yang mempunyai maklumat dan mereka ingin membuat laporan Polis dan sebagainya, kita serahkan. Tan Sri Chairman...

Mr ChairmanEN

Menteri perlukan berapa minit lagi?

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHLembah PantaiEN

Saya sudah hendak landing sebab sudah masuk Maghrib dan sekiranya maklumat yang diperlukan oleh Ahli-ahli Yang Berhormat, saya akan minta supaya dijawab secara bertulis. Akhir sekali, saya pohon supaya Ahli-ahli Yang Berhormat bersama dengan kerajaan dalam usaha untuk pastikan Internet yang kita sediakan sama ada di Langkawi- Langkawi saya telah minta supaya MCMC meneliti dan juga pihak kementerian meneliti masalah di Pulau Tuba yang saya sendiri pernah lawat dan saya setuju memang ada isu-isu Internet di kawasan itu. Nanti kita akan sampaikan secara bertulis kepada Ahli Yang Berhormat. Saya pohon supaya kita bersama untuk pastikan Internet bukan hanya lebih selamat, lebih boleh dimanfaatkan oleh semua termasuk Ahli Parlimen Pembangkang dan boleh terus bersuara, tetapi kita hendak Internet yang lebih selamat, lebih meluas, lebih murah yang paling penting lebih selamat untuk kanak-kanak dan keluarga. Sekian, terima kasih. Assalamualaikum.

Mr ChairmanEN

Baik, Yang Berhormat. The question is that the sum of RM1,077,476,700 for Head B.47 of the Operating Expenditure Estimates 2025 be part of the Schedule. [Question put and agreed to] [Head B.47 ordered to stand part of the Schedule]

Mr ChairmanEN

The question is that the expenditure under Head P.47 of the Development Expenditure Estimates 2025 be approved. [Question put and agreed to] [Head P.47 ordered to stand part of the Estimates] [The House resumed sitting] [Mr Speaker in the Chair]

Mr SpeakerEN

Ahli-ahli Yang Berhormat, the sitting of the House today is adjourned until 10 a.m. on Thursday, 28 November 2024. Assalamualaikum warahmatullahi wabarakatuh dan selamat malam.

[The House adjourned at 7.04 p.m.]

Special ChamberSpecial Chamber

[Mr Speaker presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Sungai Buaya Flood Mitigation PlanSpecial Chamber

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Thank you, Mr Speaker. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. The Most Honourable Minister. I, the Member of Parliament for Kuala Nerus, wish to raise the issue of the Sungai Buaya Flood Mitigation Plan (RTB), Kuala Nerus, as a measure to address the flooding that has affected the surrounding residential areas.

I wish to express my thanks to the Honourable Minister, who approved the Banggol Air Lilih and Sungai Tepoh Flood Mitigation Project, which was included in the 2025 Budget announced by the Most Honourable Prime Minister recently.

However, the construction of the RTB Banggol Air Lilih and Sungai Tepoh has yet to fully resolve the flooding problem in Kuala Nerus, particularly that affecting residents in the areas of Sultan Mahmud Airport and the Gong Badak Sports Complex, namely the catchment areas of Kampung Tanjung Jaafar, Jalan Lapangan Terbang, Gong Sentul, Taman Desa Yayasan Terengganu (YT), Sekolah Imtiaz, Taman LG and also the surrounding areas. It needs to be connected with the RTB Sungai Buaya to ensure that the rainwater flowing from the Banggol Air Lilih, Sungai Tepoh and Sungai Buaya areas can be fully channelled into the Sungai Terengganu.

For the information of Tan Sri Mr Speaker, at present, the areas near the Sungai Buaya that I mentioned earlier are low-lying basins that hold water flowing from higher ground whenever there is heavy rain, and they become stagnant flood areas.

Checks carried out through the Department of Irrigation and Drainage (JPS) Terengganu State found that the application for the RTB Sungai Buaya has been escalated by the State Economic Planning Unit (UPEN) Terengganu to the Federal level. However, until now, the status of the application for this RTB project has not been clearly communicated. This issue is also frequently raised in the Kuala Nerus District Action Meeting, and has even become one of the main complaints from residents affected by disasters during the flood season, especially during the current monsoon season.

Therefore, I hope that the application for the RTB Sungai Buaya project can be approved and that the project can be implemented immediately so that the flood problem that has haunted residents every year in the affected areas can be resolved.

That is all, thank you Tan Sri Mr Speaker.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Tindakan Daerah Kuala Nerus, bahkan menjadi antara topik aduan utama penduduk yang ditimpa musibah di musim banjir, lebih-lebih lagi dalam tempoh musim tengkujuh yang berlaku sekarang.

Oleh itu, saya berharap permohonan projek RTB Sungai Buaya ini dapat diluluskan dan projek dapat dilaksanakan dengan kadar segera agar isu banjir yang menghantui penduduk saban tahun di kawasan-kawasan terjejas dapat diselesaikan.

Sekian, terima kasih Tan Sri Yang di-Pertua.

Mr Speaker

Sila menteri.

Dato’ Sri Haji Fadillah bin Haji YusofPBB · GPSDeputy Prime Minister and Minister of Energy Transition and Water Transformation · Petra JayaEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Tan Sri Mr Speaker. Firstly, thank you for the concern of the Honourable Member for Kuala Nerus regarding the status of the application for the Flood Mitigation Plan Project, or in short, the RTB Sungai Buaya.

For the information of the Honourable Member, the Ministry of Energy Transition and Water Transformation (PETRA), through the Department of Irrigation and Drainage (JPS), will apply for the RTB Sungai Buaya project under the first Rolling Plan of the Thirteenth Malaysia Plan. However, we may need the assistance of the Honourable Member for Kuala Nerus later to ensure that the state government also places this project as a priority under the State Project List when it is submitted for the Thirteenth Malaysia Plan projects later.

The main scope of this project includes river upgrading, construction of embankments and flood retention ponds. This project will reduce the flood risk in the catchment area of Sungai Buaya, including the areas of Kampung Tanjung Jaafar, Taman Desa YT, Sekolah Sukan Negeri Terengganu, Majlis Sukan Negeri Terengganu, Taman LG Utama, the vicinity of Gong Sentul and Kampung Telaga Batin.

As a short-term solution, the Ministry, through JPS, has carried out minor works under the River Conservation Project to reduce the flood risk. An allocation totalling RM1.1 million was disbursed for the Kuala Nerus Parliamentary constituency from 2022 to 2023 to carry out 37 quotation works involving main scopes such as river dredging, river bank stabilisation works, and upgrading of drains and related structures.

In 2024, RM429,000 was allocated to carry out 16 quotation works, which will be completed by December 2024. For the information of the Honourable Member, the responsibility for maintaining the drainage system in urban areas is shared among several parties, namely the local authority (PBT), the Public Works Department, the Department of Irrigation and Drainage (JPS) and also the District and Land Office.

Based on the decision of the Cabinet on 19 June 1996, JPS was fully given the responsibility to manage and maintain all rivers, including rivers within PBT areas. Meanwhile, PBTs were given the responsibility to manage and maintain the drainage systems in their respective areas. Section 50 of the Street, Drainage and Building Act 1974, which is Act 133, also states that PBTs shall construct and maintain drains and river channels. However, the Ministry will always work together with the relevant agencies to ensure that the drainage system functions well. That is all, thank you.

Mr SpeakerEN

Alright, are there supplementary questions? First.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Thank you, Tan Sri Mr Speaker. Firstly, thank you to the Honourable Minister who has been willing and agreed to include the RTB Sungai Buaya project in the First Rolling Plan for the Thirteenth Malaysia Plan, thank you very much. But in the interim, while waiting until 2026, the RMK 2026, the residents in the surrounding areas that I mentioned earlier may experience several more inundations. Right now, there is already heavy monsoon rain in Kuala Nerus.

I request an urgent project for several river basins that are in the same flow as the Sungai Buaya. We have three tributaries there: Sungai Alur Kuda, Sungai Buaya and Sungai Alur Chenang. These are among the causes that prevent the water from the aforementioned catchment area from flowing away quickly.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

So, if there is an urgent allocation to be given either once or perhaps next year so that these three rivers can be deepened and cleaned through the GPS allocation. I seek the Minister's reply. Insya-Allah.

Mr Speaker

Silakan Menteri.

Thank you, Honourable Member. Tan Sri Mr Speaker, indeed we have several types of allocations, whether for emergencies, urgent programmes and so on. For 2025, God willing, Terengganu will also be allocated, and on this matter, Honourable Member, I believe the Director of JPS Terengganu is also behind me here. We take note, and we will ensure to look at where the priorities are, after discussion with the State Government, which determines the priorities where urgent projects need to be implemented. God willing, SWT, we will listen and we will take action. Thank you.

Mr SpeakerEN

Alright, thank you. Secretary.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Proposal for Disaster Ward Lift ProjectSpecial Chamber

Mr Speaker

Silakan.

Dato' Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

Thank you, Tan Sri Mr Speaker. My question, my motion number two. The Honourable Deputy Minister. I, the Member of Parliament for Kuala Nerus, wish to raise the issue of the proposal for the Construction of One Lift Unit for the Short Stay Unit (SSU) and Disaster Ward, Building of the Emergency and Trauma Department, Sultanah Nur Zahirah Hospital (HSNZ).

As with other government hospitals, HSNZ is not exempt from facing the issue of congestion in the Emergency and Trauma Department (ETD). In line with the initiatives outlined to overcome this congestion, HSNZ has identified the need to convert a portion of the existing space that is the disaster ward into a Short Stay Unit (SSU). In addition, the existing disaster ward also needs to be ensured that it can operate optimally.

Therefore, one lift unit of an appropriate size is proposed to be built to enable patients to be taken to the ward on the third floor. This ward on the third floor has no lift – on the third floor of the ETD building. The following is the justification for the urgent need to construct this lift;

Dato' Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

(i) HSNZ has a rather limited facility space to be converted into an SSU. Therefore, as an urgent measure to address the congestion problem in the ETD, the existing space on the third floor of the ETD building is suitable to be converted into an SSU, equipped with lift facilities;

(ii) disaster management can be carried out more efficiently and effectively with the availability of complete facilities, including lift services;

(iii) to facilitate the tasks of hospital staff in taking patients up and down to or from the SSU and disaster ward, most of whom are wheelchair-bound or transported using beds;

(iv) to prevent the existing building space that is the disaster ward from being left idle without use due to not having complete access facilities; and

(v) HSNZ is a State Hospital that is the main referral centre for major disaster cases or non-major disaster cases. Apart from being used as accommodation for unexpected disaster cases, the increase in the bed occupancy rate (BOR) and the absence of an observation ward in the ETD, HSNZ makes the disaster ward one of the most important needs at HSNZ. So, the disaster ward needs to be equipped with complete facilities including a lift.

If this project is not considered for implementation, it will make it difficult for hospital staff to take patients up and down to or from the SSU and Disaster Ward, most of whom are wheelchair-bound or transported using beds.

Therefore, I propose and request that this project be implemented immediately and that special allocations be used to address the congestion in the ETD and as preparation for receiving unexpected disaster cases that may occur at any time. That is all, thank you.

Mr Speaker

Sila Menteri.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Tan Sri Mr Speaker. Thank you to the Honourable Member for Kuala Nerus, who frequently asks about issues relating to the very active Ministry of Health.

Tan Sri Mr Speaker, the Ministry of Health (KKM) takes note of the need to construct a lift in Block C, which is a three-storey building housing the Emergency Department (ETD) of Sultanah Nur Zahirah Hospital, as raised by the Honourable Member. For the information of the Honourable Member, the three-storey block building proposed for the construction of this lift houses several facilities, namely;

(i) first floor, Emergency and Trauma Department;

(ii) second floor, Administration Unit; and

(iii) third floor, A clinical ward that can accommodate 24 beds.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

At present, due to the absence of a lift, this ward is used for clinical training sessions for health personnel and is not used to accommodate patients for treatment purposes. The original design of this building originally had a lift system facility. However, the construction of the lift system could not be carried out due to budget constraints at that time.

Taking into account the importance of installing the lift, the KKM Engineering Services Division has carried out an inspection and assessment of the proposal to install the lift. The assessment found that the proposal to install a lift in this three-storey building is impractical because the construction of a lift shaft on the outside of the building will obstruct the access route for fire engines to extinguish fires should an unwanted incident occur.

For information, the existing distance between the three-storey building and the adjacent PRIBA complex is 8.7 metres.

The construction of a lift shaft in the building will make the area there narrow, because under the 2022 amendment to the Uniform Building By-Laws (UBBL) and the Fire Services Act, the minimum clearance for fire engine access routes is six metres.

And I also understand what the Honourable Member has proposed.

We have already carried out preliminary works and found that it is not suitable, and we still maintain the function of the clinical ward as a training venue.

Nevertheless, the proposal for a short SSU is one of the proposals, and we are currently looking for alternatives other than the construction of the proposed lift location. We are looking for the appropriate method to use the 24 beds as an SSU in the future.

A thorough study is being undertaken, and if the Honourable Member has better proposals, we will consider them. That is all, thank you Tan Sri.

Dato' Dr. Haji Alias bin RazakPAS · PNKuala NerusEN

Thank you, Honourable Member, Tan Sri. I understand that I happened to be previously an EXCO member for health as well, and I have made a visit together with the former health minister and indeed was given a fairly complete briefing on the need for the lift.

If not, we would be wasting a space, when here at HSNZ itself we are indeed short of beds to the point that some overflow during certain seasons. Moreover, if a disaster occurs, for example like during COVID. Recently, we were indeed severely short of beds, and in my view, the ward with 24 beds is very suitable for an SSU and needs to be expedited.

Whether the lift is suitable or not is beyond our field as doctors, but as – it is up to the engineers. I hope that it can be worked out in any case. If not in that area, then in another area to build a lift to go up to the third floor. If not, it would be unreasonable to lift patients by bed, stairs and so on and those who make efforts and so forth.

I very much urge KKM to conduct a more thorough study so that it can be utilised. There are plans to build a new hospital block, which are still within our plans, and may be presented in the near future, but for the next five or six years, the Deputy Minister also needs to review it again so that what has been done can be realised and utilised.

Because previously, in what the Minister answered just now, there should have been a lift, but due to budget constraints at that time it was not put in place. So what it means is that the design has already been done by someone, but there is no money now, God willing, I hope that in this era there is money so that it can be continued later. Thank you.

Thank you, Honourable Member for Kuala Nerus, Tan Sri Speaker, for the information of Tan Sri. This is the problem that we often face in health facilities, especially changes in scope or amendments to any act.

Earlier I mentioned the Uniform Building By-Laws that were amended in 2022, and this is what has caused us to be unable to build the lift because the prescribed clearance has changed. But my proposal is well known; the Honourable Member for Kuala Nerus understands the need and also the wastage, with permission, of the 24 beds that should be utilised to focus on patients, which cannot be implemented. But we will make efforts, Honourable Member for Kuala Nerus, and I myself will also look into this matter to see what the best alternative is for us to solve the problem of wastage or the existing beds. That is all, thank you.

Mr Speaker

Baik, Setiausaha.

The Honourable Member for Keningau.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Expediting the Approval, Supply and Delivery of Mammogram Machines to Keningau Hospital, Sabah, and Increasing Specialist Doctors Together with Locum StaffSpecial Chamber

Thank you, Tan Sri Mr Speaker. Thank you also to the minister who takes this issue seriously. Mr Speaker, Keningau Hospital is in great need of a set of mammogram machines to meet the demand for such medical services.

The need is very urgent. For the information of the Honourable Minister of Health, I applied in 2020 to the then Honourable Minister of Health to supply and deliver additional mammogram machines.

Keningau Hospital also applied for a medical asset for one mammography system worth RM2.852 million in the MPIS System on 29 September 2023. Unfortunately, after four years, Keningau Hospital is still waiting for feedback and approval from the ministry. I hope that this time Keningau Hospital will receive a positive answer.

Mr Speaker, for the information, the mammogram machine is very much needed at Keningau Hospital because the number of patients is increasing, to help expedite diagnosis and treatment of patients; and also to reduce patients' costs to referral hospitals, namely Queen Elizabeth Hospital in Kota Kinabalu or the Sabah Women and Children's Hospital in Kota Kinabalu, also for follow-up examinations and treatment.

It is understood that the number of patients requiring mammogram services based on the statistics of need was 116 patients in 2022 and has now increased to 195 patients in 2023. The estimated customers of Keningau Hospital based on admissions of inpatients, daily treatment and also outpatients are as follows:

| Year |2022 |2023 | |--------------|----:|----:| |Inpatients | 1460| 1532| |Day Treatment| 1353| 1389||Outpatients |13896|15552|

For the membership of doctors and staff of Keningau Hospital as of 31 May 2024, Keningau Hospital has 201 doctors consisting of; | Membership |Number| |-------------------------------------|-------:| |Specialists | 35| |Medical Officers | 146| |Graduate Medical Officers (Houseman)| 20| |Total | 201|

Assisted by a total of nurses and assistant staff of various grades of 368 persons and Assistant Medical Officers of various grades 58 persons with a total of 426 persons.

The membership of doctors and auxiliary staff at Keningau Hospital is currently insufficient. As a result, patients have to wait a long time before receiving medical services, and Keningau Hospital is unable to provide quality and comfortable services to patients, especially the sick community in the interior areas of Keningau.

Tan Sri Mr Speaker, therefore, it is very important and hoped that the government, through the Ministry of Health, can supply a complete set of mammogram machines and add specialist doctors and auxiliary staff urgently so that Keningau Hospital can and is able to provide quality and comfortable health services to the interior community, especially in the district of Keningau. That is all, thank you.

Mr SpeakerEN

Alright, thank you. The Minister, please.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Tan Sri Yang di-Pertua. Tan Sri Yang Di Pertua, mammogram examinations are available at four hospitals in Sabah, namely Hospital Queen Elizabeth II, Hospital Wanita dan Kanak-Kanak Likas, Hospital Tawau and Hospital Duchess Of Kent, Sandakan.

The proposal to procure and establish mammogram services at the Radiology Department, Hospital Keningau has been identified in the procurement priority list for 2025, which will enable better service delivery to residents of Keningau and facilitate the delivery of and access to services for the people.

For your information, the paper for the application for approval of this equipment procurement is in action to be implemented under the First Rolling Plan, Thirteenth Malaysia Plan (RP1 RMK-13). Apart from new procurement, the priority for equipment procurement each year will also be given to the replacement of equipment that has been damaged and is obsolete at state hospitals and major specialist hospitals.

Hospital Keningau, Sabah is a minor specialist hospital located approximately 110 km from the Kota Kinabalu district, which is the lead hospital for the hospitals in the Keningau Cluster, comprising Hospital Tambunan, 78 km from Kota Kinabalu, and Hospital Tenom, 146 km from Kota Kinabalu. Hospital Keningau also provides services to other districts such as the Sook district and also the Nabawan district.

Patients who require mammogram examinations from this hospital currently have to be referred to the nearest major specialist hospitals, namely Hospital Queen Elizabeth II and Hospital Wanita dan Kanak-Kanak Likas, which also function to receive cases-

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

cases of mammogram from health clinics. The total number of mammogram cases referred to Hospital Queen Elizabeth II and Hospital Wanita Kanak-Kanak Sabah from Hospital Keningau is as follows: in 2024, a total of 200 examinations up to November. 2023 - 195 examinations and 2022 - 116 examinations.

The waiting time for examinations at Hospital Keningau, Sabah is two months, depending on the appointment slots given by Hospital Queen Elizabeth II and Hospital Wanita Kanak-kanak Likas. Therefore, I understand Tan Sri what the Honourable Member for Keningau has requested, that the waiting period is two months. If we can speed it up by installing a mammogram at Hospital Keningau, this waiting period can be reduced.

To answer regarding human resources at Hospital Keningau in relation to health personnel, as of 30 September 2024, a total of 964 officers are serving at Hospital Keningau, comprising 865 permanent officers and 99 contract officers.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

The breakdown of officers' staffing according to the service scheme at Hospital Keningau is as follows. 27 medical specialists, 12 medical officers undergoing pre-service training, 129 Medical Officers, 35 Pharmacy Officers, 58 Assistant Medical Officers, 19 Graduate Medical Officers, 375 nurses, 309 officers in other service schemes.

The actual manpower requirement at any one time is influenced by several factors, including the total and peak times of patient arrivals, the types of cases referred and the workload received at any one time. The Ministry of Health (KKM) is of the view that the existing number of health personnel at Hospital Keningau is still able to provide medical services optimally to customers.

However, additional manpower requirements will be monitored from time to time and managed through the placement of contract officers or contract of service, mobilisation of officers within the cluster hospitals and transfer of officers to facilities that are more in need. Thank you.

Mr SpeakerEN

Alright. Does Keningau have a supplementary question?

Thank you for the positive answer from the Honourable Deputy Minister of Health. I would like to ask, in Keningau as well, a health complex has been planned and actually approved in Keningau. However, its implementation has been delayed due to the presence of squatters in the area. Nevertheless, these squatters have been given notice to relocate and have agreed on condition that there is a place and compensation.

Because these squatters involve residents from the Pensiangan area, we have negotiated with the Honourable Member from Pensiangan, namely the Honourable Arthur Kurup, to discuss this relocation in the Sook District, and I have discussed with the State Assemblyman for Sook and the Honourable Member for Sook has agreed to provide a plot of land for them to relocate.

So, because these squatters will be resolved by us, could the ministry expedite the implementation of the health complex in Keningau, which I believe will cost approximately RM300 million, to be accelerated, and when this project is completed it will help in terms of health services and avoid the situation where many patients enter the hospital and there is no capacity to accommodate them.

If there is no preventive measure, the facilities for them will be examined. Thank you.

Mr Speaker

Sila Menteri.

Thank you, Tan Sri Yang di-Pertua.

Regarding the status of the construction of the Keningau complex, we have already set up a task force committee, established on 20 February 2024, and we have also met seven times and submitted the task force report on 24 September 2024, and on 20 October a meeting with the KSU at JKNS, or the Sabah State Health Department (JKNS), was held.

The decision we obtained is that we will indeed proceed with the construction by demolishing and rebuilding the structure, because it can no longer be repaired, Honourable Member, as you already know, its age is more than 50 years.

Nevertheless, the Ministry of Health (KKM) and also the Public Works Department (JKR) are examining this final decision, to be known in December 2024, where we will either obtain a new site, but certainly we will need assistance from the local Honourable Member, especially the state government, if they can offer a place or a new site for the construction of this health complex, because we cannot postpone it any longer, and the unsuitability of the existing site will further delay the development process of the Sabah Health Complex. Thank you, Tan Sri.

Mr SpeakerEN

Thank you, Minister. Secretary.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Expediting the Development and Construction of Roads and the ICQS (Immigration, Customs, Quarantine & Security) Complex at the Sabah-Kalimantan BorderSpecial Chamber

Mr SpeakerEN

Please. The fourth motion, Seven D, yes.

Thank you, Tan Sri Yang di-Pertua. Motion regarding the construction of roads and ICQS (Immigration, Customs, Quarantine, Security) complexes in Bantul, Nabawan, Pensiangan, which borders Lumbis, Labang, Kalimantan, and also Serudong, Kalabakan, Sabah, which borders Simanggaris, Kalimantan.

On 28 February 2023, the Minister of Economy Malaysia, Datuk Rafizi Ramli, stated in this august House that a sum of RM367 million was allocated for the ICQS Complex in Bantul, Nabawan, and RM819 million was allocated to upgrade roads including accommodation and construction of the ICQS Complex in Serudong, Kalabakan.

Both of the above ICQS Complexes are very important for connecting Sabah with Kalimantan. In Sabah there are only 2 transit points, namely Tawau-Nunukan-Tarakan by sea and Sungai Mensalong in Keningau.

There is not yet an official land ICQS between Sabah and Kalimantan. Meanwhile, Sarawak has built 3 of the 7 ICQS Complexes bordering Sarawak and Kalimantan by land at Tebedu-Entikong, Biawak-Aruk and Lubuk Antu-Nangga Badau, in Kalimantan.

On the Kalimantan side, the ICQS or Border Crossing Post (PLBN) Simanggaris and PLKN Lumbis have been completed by Indonesia, and both PLKNs are directly connected to the new capital city, Nusantara, through the Trans-Kalimantan Highway corridor. Directly, the construction of both ICQS Complexes will facilitate cross-border travel between Bantul, Nabawan, and Serudong, Kalabakan, and will become a new centre of economic activity including import and export between Sabah and Kalimantan, while boosting the rural economy of Sabah.

Previous government surveys have identified 26.3 hectares for the site of the ICQS Complex in Bantul and a location known as A708 for the construction of the ICQS Complex in Serudong. This will directly be able to upgrade the economy of residents around Bantul and Serudong and is in line with the Sabah Maju Jaya 1.0 Development Plan, in which Serudong-Kalabakan and Bantul-Pensiangan are planned as focal centres for economic growth of border or frontier areas.

It is targeted to increase economic activity and expand various sectors, including development, trade, tourism, agriculture, employment opportunities and entrepreneurship, to upgrade the economic status of the people in the area and to eradicate poverty in Sabah, especially in the interior of Sabah.

In addition, it will also enhance national security while controlling and overcoming smuggling activities and controlling the transport of subsidised goods from our country there. It also provides opportunities for two-way trade and realises the objectives of BIMP-EAGA and enhances the economic relations of the countries involved, improving the border development of the said areas.

The Malaysian people in the interior of Sabah near Keningau earnestly hope that the Federal Government, through the Ministry of Home Affairs Malaysia (KDN), can implement and build both of the ICQS Complexes in Bantul and Serudong, Tawau, interior Sabah immediately and expedite the approval and channelling of allocations for their construction. Thank you.

Mr SpeakerEN

Alright, thank you. Minister, please.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Bismillahi Rahmani Rahim. Honourable Tan Sri, my friend from Keningau. The Ministry of Home Affairs (KDN), as the ministry responsible for security, is very sensitive to the aspects of development and the need for border development across the country, especially on the Sabah-Kalimantan border raised by the Honourable Member earlier.

On 8 June 2023, the Ministry of Economy had approved a sum of RM41.1 million under the Third Rolling Plan, Twelfth Malaysia Plan for the implementation of three new development projects at the Sabah-Kalimantan border as follows, Honourable;

(i) Sabah Border Project. Construction of a Temporary ICQS in Bantul, Pagalungan, Nabawan, Sabah valued at RM31.1 million,

(ii) The second project is the Sabah Border Project. Preliminary works for the construction of ICQS Bantul, Pagalungan, Nabawan, Sabah valued at RM5 million and

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

(iii) Sabah Border Project. Preliminary works for the construction of ICQS Serudong, Kalabakan, Sabah valued at RM5 million.

Honourable Tan Sri, at this time, the project has been handed over to PBLT Sdn. Bhd. as the implementing agency in accordance with the approval of the Ministry of Finance on 3 May 2024 last. PBLT Sdn. Bhd. is responsible for preparing the project design based on the project scope that has been approved.

KDN has also submitted an additional application for the construction of a temporary control post for the control of entry and exit of travellers between Malaysia and Indonesia at the ICQS Serudong, Kalabakan site on 11 October 2024 last, and this matter is still under consideration by the Ministry of Economy. The location has also not yet been agreed by the Indonesian side as a cross-border point or International Entry Point (PMA) at point A708 between the two countries. It is still at the discussion stage.

At present, the control is carried out by the Malaysian Armed Forces (ATM), taking into account that this area is uninhabited and there is Camp Luis approximately 2.5 kilometres away. Honourable, I believe you know that the border is supervised by the ATM. KDN constantly monitors the progress of the projects implemented by PBLT Sdn. Bhd., and we are optimistic that the synergy between KDN and the PBLT company can produce significant results in increasing the physical progress of project implementation on this Sabah border.

Perhaps, as information, I can present the latest status. For the Sabah Border Project, preliminary works for the construction of ICQS Bantul, Pagalungan, Nabawan, Sabah. Land survey works were fully completed on 15 September last. The implementing agency for this project, as I mentioned earlier, is PBLT Sdn. Bhd., as per the approval letter from the Ministry of Finance dated 3 May 2024 last, and the exemption from the Treasury Circular AP182 from the Sabah Public Works Department (JKR Sabah) dated 21 September 2023.

For the Sabah Border Project, construction of the Temporary ICQS in Bantul, Pagalungan, Nabawan, Sabah, five work packages are being implemented. Quotations by the District Office of Nabawan have been fully completed as follows;

(i) the first quotation, Proposal to Construct an Access Road to the ICQS Bantul, Pagalungan, Nabawan site three kilometres long from kilometre 67, Jalan Sima Tua Bantul and Site Clearing Works of Two Acres. Completed on 20 September 2023.

(ii) the second quotation, Proposal for Earthworks at the Temporary ICQS Bantul, Pagalungan, Nabawan Site was also completed on 20 December 2023 last.

(iii) the third quotation, Construction of a Retaining Wall, ......

New Wall at the Temporary ICQS Bantul, Pagalungan, Nabawan site was completed on 8 July 2024 last.

(iv) for the fourth quotation, Planting of Grass on the Hill Slope at the Temporary ICQS Bantul, Pagalungan, Nabawan site was completed on 15 July last.

(v) for the fifth quotation, Construction of a New Drainage System for the Slope at the Temporary ICQS Bantul, Pagalungan, Nabawan Sabah site was completed on 8 July last.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

At present, the implementing agency for the PBLT company mentioned earlier and what we are doing is based on the approval obtained from the Treasury Circular. For the Sabah Border Project, the preliminary works for ICQS Serudong, Kalabakan. These are three work packages, also by quotation, by the District Office of Kalabakan, which have been fully completed;

(i) is the Proposal to Construct an Access Road to the ICQS Serudong, Kalabakan, Sabah Site and Related Works, completed on 26 December 2023,

(ii) the second quotation is the Proposal for Land Clearing Works at the Temporary ICQS Serudong, Kalabakan, Sabah site and related works, completed on 31 December last year,

(iii) is the Proposal for Drainage and Drainage System Works at the Temporary ICQS Serudong, Kalabakan Sabah Site and Related Works. This was also completed on 31 January this year.

Land survey works were completed on 15 September 2024.

At present, the implementing agency is also PBTL Sdn. Bhd., and we are confident that the works will proceed according to schedule, and we hope that it will help and answer the questions raised by the Honourable Member. Thank you.

Mr SpeakerEN

Honourable Keningau, do you have a supplementary question?

Thank you for the answer from the Deputy Minister, and I welcome the developments that have taken place. My supplementary question is, once both of these ICQS are completed, will a one, single agency border be established to manage them.

My question is, given the presence of state departments that have autonomous powers, such as agriculture, the JPS department and fisheries, where they will also carry out duties for bio security and so on. Could the Honourable Member explain how this single border agency will function with the presence of departments or agencies that will also be stationed in the area? Does this single border agency have final authority to make decisions, or is it only a coordinator? Thank you.

Mr Speaker

Silakan.

Thank you, Tan Sri Yang di-Pertua. Honourable Keningau, as we already know, the Border Control and Protection Agency (IKPS) was established to carry out the functions of controlling and inspecting persons, goods and also vehicles at the country's entry points. Meanwhile, responsibility for border control at this time is still retained under the Royal Malaysia Police (PDRM) through the PGA in cooperation with the Malaysian Armed Forces (ATM).

Pagalungan is one of the 14 active national entry points gazetted in the state of Sabah.

According to the plan of the Border Control and Protection Agency, the national entry point in Pagalungan will be taken over for its operation in the third phase of AKPS operations implemented on 1 January 2026, this is the plan that we have made.

As additional information, perhaps the Honourable Member may wish to know which agencies will be placed at the temporary ICQS, with assistance from Pegalungan, Nabawan and possibly also the ICQS at Seradong, Kalabakan. For the information of the House, for the temporary ICQS at Bantul, Pegalungan Nabawan Sabah, which is currently being built by BLT Sdn Bhd, it is proposed to place seven agencies.

The first is the Malaysian Immigration Department (Jabatan Imigresen Malaysia), the second is the Royal Malaysian Customs Department (Jabatan Kastam Diraja Malaysia), the Royal Malaysia Police (Polis Diraja Malaysia), the Sabah State Health Department (Jabatan Kesihatan Negeri Sabah), the Fisheries Department (Jabatan Perikanan), the Agriculture Department (Jabatan Pertanian) and the Sabah Veterinary Department (Jabatan Veterinar Sabah), with a total of 38 officers.

The determination of the agencies to be placed at the ICQS was made after several engagement sessions conducted by the Selangor State Department together with the Sabah State Government. This means that our decisions are the outcome of engagement and mutual agreement with the Sabah State Government, and each agency identified will play a significant role in controlling and monitoring the movement and transactions that take place at the ICQS, according to their respective roles.

As for the ICQS at Seradong, Kalabakan, Sabah, a total of three agencies have been identified. Whereas earlier there were seven, these are the three agencies proposed to be placed at the ICQS concerned, namely the Immigration Department, the Customs Department and PDRM, with a slightly smaller number of personnel, namely 18 officers in total. The approach – the placement of these agencies – was made taking into account that the Indonesian Government has not yet decided on the actual point for the placement of its entry point. They have not yet determined it.

Therefore, any decision to be made by the Government of Malaysia, especially Sabah, at this entry point will take into account the decision made by the Indonesian Government. If we make a decision early, and they change their location, it will be a loss to us, and that is why, once the actual point of the entry point is agreed by both countries, along with the function and number of agencies to be placed at this ICQS, this ICQS will be re-evaluated, based on the decisions that will be mutually agreed by Malaysia and Indonesia. That is why we are making this temporary decision for now. Thank you.

I only request an explanation as to whether the powers of certain departments and those agencies are still held by them to make decisions? As an example, quarantine.

Agricultural quarantine, and they will quarantine, so that diseases from outside will not spread, and do they still have their respective powers? Thank you.

Mr Speaker

Baik.

Tan Sri, the functions of the agency and department remain intact. Everything we do here is based on mutual agreement with the Sabah State Government. Any changes must be made with mutual consent. So the role of the control and border agency has its limits and its borders. Therefore, it does not greatly interfere with the functions of other departments, customs and other agencies.

Mr SpeakerEN

Alright, Honourable Member, with that the Special Chamber sitting is concluded for today. The Special Chamber today is adjourned until Thursday, 28 November 2024, at 2.30 p.m. Thank you. Peace be upon you, and the mercy and blessings of God.

[The Special Chamber was adjourned at 3.20 p.m.]