Dewan Rakyat · 6 March 2025

15th Parliament, session 4, meeting 1 · not final · 620 turns · 53,032 words · official PDF ↗ · Digital Hansard ↗

541 of 620 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting]

Royal Assent to Acts

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Honourable Members. I would like to inform this House that His Majesty the Yang di-Pertuan Agong, with His gracious assent, has consented to the following Acts: 1. Penal Code (Amendment) Act 2025; and 2. Criminal Procedure Code (Amendment) Act 2025.

Announcement from Tuan Yang di-Pertua — Leave for Member

Honourable Members, I would like to inform the House that Mr Speaker has granted leave of absence from attending sittings under Article 52(2) of the Federal Constitution to the Honourable Dato' Sri Dr. Richard Riot anak Jaem, Member of Parliament for Serian, from 3 February 2025 until 6 March 2025.

Time for Questions to MinistersQuestions

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Alright, Honourable Member, we begin the sitting today. I start the Ministers' question time by inviting Tuan Shaharizukirnain bin Abd Kadir, the Honourable Member for Setiu.

Thank you, Mr Speaker.

Shaharizukirnain bin Abdul KadirPAS · PNSetiu · questionEN

1. Tuan Shaharizukirnain bin Abd Kadir [Setiu] asks the Minister of Natural Resources and Environmental Sustainability to state the firm action that has been taken by the Ministry in combating the smuggling of e-waste into the country, following the large-scale raids on illegal factories processing electronic waste in several states recently.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister of Natural Resources and Environmental Sustainability. Please respond.

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources and Environmental Sustainability · SetiawangsaEN

Thank you, Honourable Member for Setiu. Thank you, Mr Speaker. As we can see, a lot of attention is being paid to this question. On the issue of smuggling e-waste into the country. The Ministry takes this matter seriously and, under our policy, we as one of the signatories to the Basel Convention. We do not accept the importation of e-waste and we prohibit it, and we do not permit the importation of e-waste based on the country's current policy and the Ban Amendment under the Basel Convention. This prohibits developed countries, namely the countries of the Organisation for Economic Co-operation and Development (OECD), from exporting hazardous waste to developing countries. Operation Hazard has just been carried out nationwide involving cooperation between the Royal Malaysia Police (PDRM) and the Department of Environment (JAS). This involved inspections of 47 premises. We succeeded in seizing a total of 15,764.9 metric tonnes of e-waste, estimated to be worth around RM55 million. We found that 30 premises were operating illegally and seven were scrap goods premises, six premises were licensed — six licensed premises under the Department of Environment (JAS), three premises licensed under the local authorities, and one other illegal warehouse. Many of these premises are also located outside industrial areas. For example, on reserve land, oil palm plantations, and even in forest areas. Most of them operate illegally and are not licensed by the PBT (local authorities), and most of the workers are foreign workers without permits or workers who have permits but misuse their work permits. All these premises have been investigated under the Environmental Quality Act 1974, which covers various offences. For example, failing to comply with licence conditions stipulated in section 16, operating a scheduled waste external storage facility without a JAS licence, section 18, failing to submit written permission from the Director General of Environment, section 19. Section 34A, failing to submit an EIA study report, and section 34B, housing scheduled waste without the approval of the Director General of Environment. These 37 premises have been subject to operational equipment closure action under section 38A(1) of the Environmental Quality Act against production licences used in the premises without any control devices. A total of 59 directive notices and 27 compounds have been issued on various charges under the Environmental Quality (Scheduled Wastes) Regulations 2005. 52 investigation papers also

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources and Environmental Sustainability · SetiawangsaEN

will be opened for the purpose of court action. A little more, Honourable Member. Under section 34B, any placement of scheduled waste, whether on land or in the nation's waters, as well as transit activities or allowing e-waste to be transited without the approval of the Director General of Environment, is an offence.

Tuan Nik Nazmi bin Nik AhmadPKR · PHMinister of Natural Resources and Environmental Sustainability · SetiawangsaEN

Based on our new amendment that we passed together last year, the maximum fine has increased, yes. Previously it was RM100,000, now the maximum fine is RM10 million. Now there is mandatory imprisonment of not more than five years under the Environmental Quality (Amendment) Act 2024. However, we know we need to work even harder. (i) Delegation. We are considering delegating the powers of the Environmental Quality Act to PDRM for environmental crimes. (ii) To include environmental crimes under the Anti-Money Laundering, Anti-Terrorism Financing and Proceeds of Unlawful Activities Act 2001 (AMLA) and other acts too. This is because under AMLA, the powers available to this authority are stricter for taking action compared with other legislation. (iii) Amendment of the Ports Act and the Free Zones Act to take action against shipping agents who make false declarations. (iv) Listing companies that frequently violate the law. (v) Amending the Environmental Quality Act 1974 so that all recycling activities are included in the Second Schedule of the Environmental Quality Order. (vi) Establishing specific legislation for the management of waste imports. (vii) Seventhly, requiring third-party inspection for waste-exporting countries to ensure the goods conform to the pledge. (viii) Eighthly, banning the import of waste from countries that have not ratified the Basel Convention. Among the major countries that have not ratified it is the United States of America. Finally, to prioritise local waste and the import of waste that is needed by the country's industry. Lastly, for your information, this evening the Honourable Minister of Home Affairs (KDN) will also be visiting to see the current situation in the latest operation that we carried out between JAS and PDRM.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Supplementary question, Honourable Member.

Okay, thank you, Minister, for the answer given. I would like to thank the police for acting swiftly in raiding and uncovering this illegal e-waste operation. I was informed that it was masterminded by foreign nationals, which is a serious matter and could threaten national security if not curbed. My question is, how effective is the existing regulatory system in combating and curbing these illegal e-waste factory operations? Second, how many government staff or officials have been subjected to disciplinary action following the exposure of this e-waste operation? That is all, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister to respond.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you, Honourable Member. In fact, what regulatory action have we taken? Alhamdulillah, yes, I can say there has been good cooperation from all parties. The e-waste issue is indeed a serious one. I would say we received information that some of our officers were carrying out e-waste enforcement. Perhaps we had not heard of e-waste before, like drugs or other things. But now they have received video calls from the big tycoons behind this, showing videos of their children at school. That shows how serious the e-waste problem is this morning. But alhamdulillah, with good cooperation between all parties. For example, we see at the customs level, for instance, because customs acts as the gateway at our country's entry point. With good cooperation with the customs department, the number of containers seized, yes, let me give an example, increased significantly in 2019 after China tightened the entry of e-waste at its borders. So, in 2018 we had one, in 2019 we had 34 containers. In 2020 there were three, in 2021 there were 11, in 2022 there were 11, in 2023 there were 32, in 2024 there were 329. As of February this year, we already have 15. This large increase does not mean that it did not happen before. But alhamdulillah, with the cooperation with the customs department now, with better scanning done at the border, then we — and also the integrated operation. We also cooperate with NGOs such as the BeST EarthAction network, we receive emails from them when they find that ships moving from, for example, developed countries carrying this waste, then we act together. That is how we managed to hold 329 containers last year. So I want to express appreciation to all the authorities that have been involved in a very challenging task. On the actions, as I mentioned earlier, we indeed cooperate with all the agencies involved, including the Malaysian Anti-Corruption Commission (SPRM). If we find that

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

any government officer at the government level is involved or implicated, or colluding in this e-waste matter, then the government will not remain silent and they will be subjected to the highest level of action. However, specifically, I am not here. If there is, I will provide the details to the Honourable Member in writing.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member for Ipoh Timor.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Deputy Speaker. We are discussing the Basel Convention. We know that scrapped cars or end-of-life vehicles that have been disposed of are indeed subject to the Basel Convention. But if they have been broken down, past-wise, with permission, there may be room for consideration to import them for extraction or recovery of minerals, with permission. In the context where the country is developing a downstream industry in the processing or separation of rare elements, will the government consider a more comprehensive strategy or plan to consider bringing in parts, and even end-of-life cars or vehicles, so that we can use that downstream industry for the recovery of minerals from end-of-life cars? Thank you.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

Thank you. The Basel Convention is about hazardous goods entering the country. In fact, in their original condition, if they are already old, for example, let me give an example, old computers or old iPads or old phones, in an intact condition, this is usually not considered e-waste, but once they begin to be dismantled and have parts inside them, then they are considered e-waste. Our country allows the import of scrap metal with permission to enter the country for certain purposes, and there are regulations and conditions imposed by the authorities. However, what we want to avoid is environmental problems, because in the case of e-waste, if it is not separated properly, it contains pollutants that will pose a risk to the people. So, what I feel is being emphasised at the national level. If we discuss with the MITI as well, we are talking about Malaysia becoming a high growth, high value economy. So, if some of the work done to dismantle and involve work that pollutes and endangers health, that is not, I feel, work that we want to handle. Because the main principle is that we want to manage our own waste. We do not want to become the world's dustbin. That is my view of our principle whether in terms of e-waste or plastic. So on that basis, we are not completely closing off recovery. As I mentioned, scrap metal is permitted. However, we have certain conditions regarding the purity and cleanliness of the scrap metal so that it does not later endanger the local community.

Tuan Nik Nazmi bin Nik AhmadPKR · PHSetiawangsaEN

So, I feel that is among the matters — we know about urban mining and so on, but if we can manage well the waste that exists in our country first, that for me is already a positive thing. For your information, from 2015 to 2023, there were 764,453 metric tonnes of local e-waste generated. That should be our focus for us to manage. Because if we cannot manage the local waste, and we want to add more from abroad without sufficient capacity, it will become an environmental problem that will become a nightmare for the people of Malaysia. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Moving on to the next question. I invite Tuan Lee Chean Chung, the Honourable Member for Petaling Jaya.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you, Dato' Speaker.

Lee Chean ChungPKR · PHPetaling Jaya · questionEN

2. Tuan Lee Chean Chung [Petaling Jaya] asks the Minister of Home Affairs to state what are the latest initiatives of the Immigration Department of Malaysia in strengthening service improvements, especially involving immigration facility passes such as the Temporary Work Visit Pass (PLKS) and Entry Permits, following the Ministry's success in introducing various new initiatives and reforms in important matters such as citizenship matters, congestion issues at entry points and others.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister of Home Affairs to respond.

Datuk Seri Saifuddin Nasution bin IsmailPKR · PHMinister of Home AffairsEN

Thank you. Peace be upon you and the mercy and blessings of Allah.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Waalaikumussalam.

My colleague from Petaling Jaya and Honourable Members, the function of this Immigration Department concerns passes and also permits, yes. We have a two-tier system for the entry and presence of foreigners in our country. First, visas. A visa means permission to enter. But once they are here, the purpose of their being there, we issue a pass. So, we have more than 11 pass types. The most popular is the foreign worker pass. We call it the Temporary Work Visit Pass, that is the highest. Okay. Second, is the student pass, yes. They come here, they study at universities and colleges in our country. So we give them a student pass. Also high is the spouse pass for citizens. Our citizens' spouses are foreigners. So, while they are here, we issue them a pass. It is called the spouse pass. There are also passes for expatriates, professionals who work for specific purposes, and they also contribute to the economic interest. So, this list of passes has about 11 types. So in total, Mr Speaker, every year we issue nearly three million passes. Okay, what is

the reform measure? The reform measure is that the Immigration Department has implemented a digitalisation agenda. Digitalisation means that the process of applying for passes, which previously required going to the counter, we have now begun to shift. Although not all types of passes, these popular passes we now handle only online. The benefits are great, Mr Speaker. First, we save government costs. We were spending nearly RM13 million just to print stickers. When a pass is issued, a sticker had to be pasted onto the passport. Now it is not necessary. Because they only need to bring a device and the status of the pass is on their device. And for inspection purposes, all the relevant immigration staff already have the system, and also use devices to detect authenticity to prevent fraud. So, to answer the Petaling Jaya question, we are moving towards that. When the Temporary Work Visit Pass expires and needs renewal, employers no longer need to go to the counter. As a result, Mr Speaker, the counters managing these passes have experienced a reduction in congestion of up to 70 per cent. In the budget speech, Tambun urged that government services move in that direction. The second point, Mr Speaker, is entry permits. For entry permits, the reform we are making now is that most of those applying for entry permits, Mr Speaker, are wives of foreigners. The wife is a foreigner, married to a local husband. Among every 100 entry permit applications, there are many types, but 80 per cent are foreign wives. Wives of citizens. Previously, for five years they had to remain here and could not get out. They had to stay here. That was only the spouse pass. In the sixth year, they apply for an entry permit. This means they can work and no longer need to apply for immigration permission. Okay, then, if they wish to obtain a red IC and subsequently become citizens, this is the path. But there are also those who obtain an entry permit and do not want to give up their original citizenship, that is also fine. So previously it was five years. Then they had to wait two years to apply. The reform measure that we will begin in September this year requires only three years. Evidence of their presence here with their marital status. If they married here and registered the marriage here, three years. We give them a spouse visa, and in the fourth year they can apply for an entry permit. But if they registered the marriage outside the country, they have already been married for three or four years. They just enter our country, register their marriage, and only need to be here for one year. Then, in the second year they can already apply for an entry permit. This is what I am explaining, because there are many enquiries outside, now asked by Honourable Members, who write to me asking for help and so on, are in this category. So, the measure we are taking is that starting September, we will make it easier.

Currently, the outstanding backlog is only 11,700, and the KDN commitment, especially the Immigration Department, by June, by the end of June this year, we will complete all the 11,700 applications. This is our continuing commitment at KDN to simplify the service delivery system to the people, concerning passes and also entry permits. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Supplementary question, the Honourable Member for Petaling Jaya.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Congratulations and my best wishes. This is a very fundamental reform, which allows a spouse who is a foreign national to a citizen to be integrated into our society quickly. My question is this: in keeping with the passage of time, is the Malaysian Immigration Department ready to simplify matters and provide appropriate facilitation so as to reduce dependence on agents? Many of its processes still depend on agents, and especially involve foreign investors who need certain passes so that they can stay in Malaysia just to carry out due diligence. Due diligence before making an investment. Yes, this is important for attracting FDI. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, to reply.

Thank you, Mr Speaker. This question is specific. To what extent does the Malaysian Immigration Department play a role in managing an important segment, namely investors who come into our country, the expatriates. Okay, what we are doing now is that if we go to KLIA, we will find a premises we call Xpats Gateway. That means they just get off at the airport and go straight there for their business. So they no longer need to go through agents, there is none, okay. The problem with agents is that when they land, they go outside and want to come and transact, so they hire an agent. Okay, yes. But we have provided an impromptu facility. Right there, when they arrive, we process them. It takes very little time. Okay, that is the first point. The second, we also do not give importance to the role of agents, because the person who can deal with immigration for the purpose of passes for these expatriate investors is the person authorised by the company. We will only deal with that person. An agent is not a person authorised by the company. So, we will certainly not use their services. So, just for the information of Petaling Jaya, we will also introduce something new that we call a pass for investors only. Yes, that is the new pass. All of this is to enable their presence here to be admitted easily, ease of doing business is what they want to see. The faster we process their applications, the more we simplify, the better their acceptance of the business climate in our country will be. That is the role of the Malaysian Immigration Department. So, this is actually also a method we call single-window to facilitate it. So we will begin as early as 1 April this year for the issuance of investor passes

for staying here longer, for managing their investment matters, and the pass issuance process itself, we will carry out electronically, through the e-pass or electronic pass. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, the Honourable Member for Rantau Panjang.

Dato’ Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Yes, Assalamualaikum warahmatullahi wabarakatuh. Yes, thank you Mr Speaker, thank you Honourable Minister. Congratulations on the ministry's efforts to further strengthen, especially, services at the entry points. The follow-up question is mainly concerning border areas. To what extent has awareness or information been given to the public? Why do I ask? In my area of Rantau Panjang, when the river jetty crossing is closed, there is only one route, through the ICQS Rantau Panjang entry point.

Dato’ Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

But the issue that arises is that when people want to apply for a pass to go to Thailand, the border pass books are unavailable. The border pass is not available at the counter. I have been informed that this problem has been happening for months, causing some to face problems with children, some with family matters, and some with business matters, especially at the border, as they cannot use the pass. So, to what extent, if this e-pass is introduced, will this information be communicated to the public? Because this is truly a burden, especially for those whose livelihoods and economy depend on both countries, and likewise for those who have relatives in neighbouring countries. Coming up to the festive season, many have complained to me, "How do we go back?" To make a new border pass is not possible, because the border pass booklets are not available at all immigration counters. I ask for an explanation.

Thank you, my colleague from Rantau Panjang. What is being referred to is the border pass. It is a type of pass issued only for border states. That means, for example, if someone from Kedah wants to go to Sadao or Hatyai, they use a border pass. Or Langkawi, wanting to go to the islands near Thailand. That is how it is for Rantau Panjang. I take note, and thank Rantau Panjang for the feedback regarding the exhaustion of border pass booklets. Before we make the gradual shift that I mentioned earlier across the types of passes, we will prioritise the passes with high application volumes. So, for that category I will take note and immediately ask the relevant officer to ensure sufficient supply as an urgent action step to resolve this, especially as the festive season is approaching. I thank you and appreciate the feedback from Rantau Panjang.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. For the third question, I invite Puan Rodziah binti Ismail, the Honourable Member for Ampang.

Puan Rodziah binti IsmailPKR · PHAmpangEN

Thank you, Dato' Yang di-Pertua.

Rodziah binti IsmailPKR · PHAmpang · questionEN

3. Puan Rodziah binti Ismail [Ampang] asks the Minister of Agriculture and Food Security to state the detailed short-, medium- and long-term plans to address the surge in prices of coconut-based products, especially santan (coconut milk), which may affect the entire supply chain and the coconut-based value chain due to the shortage of local coconut supply, the rising price of coconuts imported from Indonesia, and weather factors.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

Thank you. It seems the Honourable Member who asked has partly answered the question. The Ministry of Agriculture and Food Security (KPKM) is always sensitive to the country's food needs, particularly in ensuring the coconut industry continues to develop. Based on the Malaysia Agro-food Statistics Report 2023, the trend of coconut production in Malaysia has shown an increase over the last five years. In 2019, the national coconut production was 536 million nuts, and it increased to 623 million nuts in 2023. However, this figure is still unable to meet the nation's requirement of 1.3 billion nuts a year, or 108 million nuts a month. Per capita coconut consumption has also increased from 22.7 kilograms per person per year in 2019, rising by two more kilos to 24.90 in 2023, showing that demand is increasing. The surge in prices of coconut-based products, especially santan, is caused by several main factors. First, the increase in coconut prices in the market since November 2024 is due to the rise in the price of imported coconuts from Indonesia, following a shortage of supply as well as an increase in Indonesian coconut exports to China. The price of imported coconuts from Indonesia was RM1.10 each in January 2024, rising to RM1.80 each in October 2024, and RM2.20 each today. Currently, the country depends 98 per cent on coconut imports from Indonesia. Second, there is the phenomenon of melawas, that is, the growth of coconut trees becoming less productive or sub-optimal due to disruptions in the process of germination or fruit production caused by extreme and unpredictable weather changes, which can affect the fertility and production of coconuts. Weather factors such as drought and floods also affect coconut production on plantations. Third, the trend of local farmers preferring to sell young coconuts rather than mature coconuts also contributes to insufficient supply for santan processing. Most coconut planters in this country choose to sell young coconuts because the price is higher and the harvesting period is shorter.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

In addressing the surge in prices of coconut-based products, especially santan, the KPKM has taken balanced intervention measures, among them supply management, research and development, and government support for the short, medium and long term. Mr Speaker, please — this question is still a hot one right now. The santan question. Under short-term intervention, the KPKM through the Federal Agricultural Marketing Authority (FAMA) will bring in 640,000 mature coconuts each month from Indonesia, Sabah and Sarawak to ensure that the coconut supply for use in Peninsular Malaysia, especially during the festive season, is sufficient. Up to 4 March 2025, FAMA and FAMA Corporation have brought in 734,096 mature coconuts from the state of Sabah and the country of Indonesia, with a purchase value of RM1.615 million. These mature coconut supplies were then distributed by 42 FAMA operation centres to the market through 509 FAMA marketing outlets such as Agrobaazar Kedai Rakyat, Agrobaazar Rakyat, pasar tani, and pasar tani kekal. Part of the supply was also distributed to 16 wholesalers and 202 santan entrepreneurs nationwide. This measure will help stabilise prices and ensure the continuity of supply for the santan processing industry and coconut-based products. Under medium-term intervention, the KPKM through the Department of Agriculture Malaysia is implementing various initiatives to increase local coconut production. Under the Coconut Industry Development Programme 2021-2025 in the Twelfth Malaysia Plan, the government has provided incentives to farmers to increase coconut production through: (i) replanting, replacing old or unproductive coconut trees; and (ii) rehabilitation of coconut trees, improving the efficiency and productivity of existing plantations. Farmers are also given assistance in the form of agricultural inputs such as seedlings, fertiliser, weedicide, pesticides, as well as basic plantation infrastructure, including the provision of drainage areas and small plantation drains. Under long-term intervention, the KPKM continues to encourage farmers to plant high-yielding coconut varieties such as kelapa matag, Malayan Red Dwarf, Malayan Yellow Dwarf and kelapa pandan. From 2021 to 2024, a total of RM15 million has been allocated for the development of the coconut industry involving 943 farmers, with new planting areas of 1,870 hectares and rehabilitation of coconut plantations of 285 hectares. A total of 1.2 million high-yielding coconut seedlings have been produced to support the project of developing the nation's coconut industry. Furthermore, in 2024, the Department of Agriculture received an allocation of RM3 million through the Coconut Seed Production Enhancement Project under the Food Security Project. This project has produced 524,606 coconut seedlings through collaboration with the relevant government agencies, GLCs and also the private sector.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

With the implementation of these measures, the KPKM believes that the surge in prices of coconut-based products, especially santan, can be controlled and further improved in the long term through increased domestic production. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Next, the Honourable Member for Ampang, supplementary question.

Thank you, Honourable Minister. I find it good that there are many plans in place, not only in terms of incentives, but we also see programmes addressing the three matters the Minister mentioned earlier. But I am worried, because we see the trend for santan, especially within just three months, for example at the end of last year, its price was about RM8 to RM12 per kilo for fresh santan, but now it is RM15 to RM20 per kilo. So, this will cause the matters concerned. So my question is, if we still depend as much as 90.8 per cent, as the Minister answered, on imports, especially from Indonesia, then I find that it will not guarantee the product from our own production. So, what exactly is the Government of Malaysia's plan to prioritise large-scale planting, or planting in clusters, or consolidating small planters, or using abandoned land, to be placed under one agency such as FELDA, FELCRA and RISDA? I think it would be stronger if we could make one agency the focus to ensure the issue of coconut products, or the planting of coconuts, is addressed. Secondly, Mr Speaker, I find that there is one type of coconut now, such as the kelapa gadung, whose lifespan and maintenance cost are easier. Does the government have any proposal to obtain kelapa gadung seeds to be planted in Malaysia? Thank you.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

Thank you. Kelapa gadung has indeed been requested by coconut farmers and planters, but it is at the MARDI stage, the research stage, and will be announced to the public in 2026. That is a new seed. The coconut planting area in 2023 was indeed 79,412 hectares. Most coconut planting in Malaysia is done by smallholders, which is 93 per cent, while the rest involves estates. Indeed, now when there is a sudden increase in coconut prices, many private parties have come to meet the ministry and plan to open their own coconut plantations. Therefore, we give encouragement and full cooperation, including to coconut planters in Sabah and also in Sarawak.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir Salak

[Bangun]

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong Karang

[Bangun]

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

To increase local coconut production, the ministry has no objection and encourages large-scale coconut production. For example, in Sabah, large-scale coconut production is carried out by PJ Nagus, covering an area of 2,000 acres, and another 2,000 acres will be added in 2026. In 2024, PJ Nagus produced 927,000 coconuts, comprising 331,000 mature variety coconuts and 556 coconuts of the Nagus variety. So this is indeed being undertaken, including with smallholders, where FAMA plays a role, among other things, in collecting from smallholders so that their produce is in the market, because we know coconut prices and santan prices are not the same between towns, between villages and so on. Therefore, FAMA's current role includes collecting from smallholders. The suggestion from the Honourable Member for Ampang is very welcome, and we indeed want FELCRA, FELDA and also private companies to get involved in expanding coconut planting, and it benefits whether they sell young coconuts or mature coconuts.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Please, the Honourable Member for Pasir Salak.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

Thank you, Dato' Dr. Speaker, Minister. We understand that there is a FAMA Food Processing Centre, such as the one in Kuala Selangor, which functions in the production and distribution of santan. Pasir Salak's question: is it still functioning as a santan production centre that supplies santan to the market, and to what extent does the government plan to improve research and development, R&D, on high-yielding coconut varieties and agronomic practices that can increase production efficiency? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister to reply.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

Whether this santan factory is fully operational, I will check. I will give the answer shortly, either in writing or by meeting, so that I can verify it properly, and later I will provide the figures, since that question is specific. Today we are going into general questions, about the rise in coconut prices and so on. Indeed, we are currently carrying out a Regulatory Impact Assessment study on the proposal to establish a Board for the Pineapple, Coconut and Durian Industries, which will be merged. With this board, we hope it can be planned better, especially coconut planting in the future. It is indeed a long way off, because we import a lot from Indonesia. When Indonesia faces price increases, santan prices in Malaysia also rise. Therefore, we also have now, when coconut prices are high, some, for example in Penang, who have converted their paddy fields into coconut planting. If that is not

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

necessary, because rice is also needed, and our rice supply is still not sufficient. Look for new land, land under state government, to be cultivated with coconuts. The market is assured for some years to come, because we know that our imports depend on the goodwill of the exporting country. If they can sell in other countries at a more competitive price, they will reduce their sales to us. But now in Indonesia, they are not reducing, they are only increasing prices. That is their right, because we know the coconut market depends on whatever it depends on, supply and demand. Thank you.

Dato' Dr. Zulkafperi bin HanapiBERSATU · PNTanjong KarangEN

Additional, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, please sit. The Honourable Member's session is now concluded for Ministers' Question Time today. [Ministers' Question Time ends]

Oral QuestionsQuestions

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Right, I begin by calling the Honourable Members with questions. First, I invite Datuk Andi Muhammad Suryady bin Bandi, the Honourable Member for Kalabakan.

Thank you, Dato' Yang di-Pertua. The Kalabakan platform grows ever distant, Lake Lenggong's calm blends as one, Past memories keep on stirring, I respectfully request answer number one.

Andi Muhammad Suryady bin BandyUMNO · BNKalabakan · questionEN

1. Datuk Andi Muhammad Suryady bin Bandy [Kalabakan] asks the Minister of Home Affairs to state whether the ministry intends to increase the number of Child Interview Centres (CIC) in East Coast Sabah, given that at present there is only one CIC in West Coast Sabah, and this affects the efficiency of resolving criminal cases involving children due to Sabah's geographical area.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister to reply.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Thank you, Honourable Member. Dato' Dr. Yang di-Pertua, my friend from Kalabakan, the CIC was established on 12 February 2002, and the first location was in Kuala Lumpur. Initially it was known as the Child Protection Unit (CPU) before being changed to the Child Interview Centre (CIC). The CIC is a special centre established by the Royal Malaysia Police to conduct interviews with children who are witnesses or victims of crime

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

...especially in cases of abuse, sexual exploitation, domestic violence and other criminal cases involving children. The main objective of establishing the CIC is to reduce the trauma experienced by children who are victims or witnesses of criminal incidents when their statements are recorded by the police. In addition, it enables children to give statements in a more comfortable and conducive environment. At this time, Honourable Member, a total of 34 Child Interview Centres (CIC) have already been established nationwide by the Royal Malaysia Police (PDRM). Of that total, there are 28 CIC centres in Peninsular Malaysia, three in Sarawak and three in Sabah, Honourable Member. For the information of the Honourable Member, two of the three CIC centres in Sabah are in the East Coast area of Sabah, namely in Sandakan and also in Tawau. Therefore, the ministry is of the view that the two CIC centres on the East Coast are sufficient at this time. However, Honourable Member, the ministry and PDRM will study and review the need to add CIC centres on the East Coast from time to time. Thank you, Honourable Member.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Here is the supplementary question from the Honourable Kalabakan.

Thank you, Deputy Minister, for the very thorough explanation. Criminal cases involving children have become increasingly worrying from year to year, especially in rural and interior areas. Perhaps it is due to a lack of exposure or awareness of these child crimes. In the process of interviewing children, victims of crime need a specific approach so that children are able to share information without fear and without the long-lasting effects of trauma. So I would like to ask, what steps is the ministry taking in providing capacity in terms of expert officers and modern interrogation methods, for example to reduce emotional stress. And to what extent is it effective. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Thank you, Dato' Dr. Mr Speaker, my friend Kalabakan. I want to give the statistics first. If we look at the statistics on the number of recordings handled by the CIC in the state of Sabah alone. In 2003, 2023, the total was 385, and in 2024 it was 476. There is an increase here. KDN and the Ministry of Home Affairs (KDN) as well as PDRM have taken various strategic steps in our efforts to increase the capacity and expertise of our officers at the CIC in conducting child interviews, by emphasising trauma-based approaches, modern forensic techniques and interrogation methods that reduce emotional stress, reducing the emotional stress of the children themselves.

Among them, we have collaborated with forensic and psychology experts to provide specific training and interview techniques that are sensitive to child trauma. This includes the use of an approach that takes into account the children's emotional well-being during the process. Second, we are also developing multi-agency training with the Department of Social Welfare, PDRM, members of the SCAN team, and NGOs to improve coordination and ensure consistency in providing support to victims, as well as with the Public Prosecutors, legal counsel and the judiciary, particularly in accordance with their respective functions and roles. In addition, we are strengthening skills through training with international parties such as the United States Department of Justice, Operation Underground Railroad, United Nations on Drugs and Crime, the Australian Federal Police and also other parties, including the FBI, in providing training and courses related to investigation systems, especially investigations involving children. In fact, there are various efforts to improve training and capacity of officers in child interviews, and we constantly make improvements from time to time in line with current developments. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan Chepa

Yang Berhormat.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Member.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Thank you, Dato' Mr Speaker. Thank you, Honourable Deputy Minister. A comprehensive answer. So my question is, since this CIC was established, how many cases have been handled? If the Honourable Deputy Minister does not have the data at this time, the Honourable Deputy Minister may answer in writing. But what is important, Honourable Deputy Minister, is that when crimes involving children occur, they certainly involve a rather deeper trauma. So, what specific form of mitigation does the Home Ministry have in addressing this trauma issue? Will alternatives be introduced if the CIC is rather lacking in some interior areas, such as alternative interviews conducted online to address and expedite cases involving child crimes, Honourable Deputy Minister? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Thank you, Honourable Deputy Minister. Dato' Mr Speaker, the data happens to be in my hands. Earlier I mentioned data relating to Sabah. If we look at the overall picture, in 2022 the statistics on the number of recordings handled

by the CIC nationwide, Honourable Member, this matter is in fact within the knowledge of Dato' Speaker, who is an experienced former police officer. In 2022 alone there were 2,013 recorded cases, in 2023, 2,483. There was a further increase in 2024 to 3,333, and the total over these three years is 6,066 recordings made by the relevant parties. In fact, the CIC and its function is a child interview centre. It is a special centre that we established to conduct interviews with children who are witnesses or victims of crime, as I mentioned earlier. The CIC is a centre for recording children's statements through video recording, which is subject to the Child Witness Evidence Act 2007, the Child Witness Evidence (Amendment) Act 2023, namely Act A1688, under section 6, video recording of child witnesses. This means that what we are carrying out is based on the act we have. In fact, at this time it has indeed been proven that the expertise we have has a good effect, because if we look, since its establishment we have had several successes and also advantages that we have achieved. Among them, the advantage, if we look at it, is that we have created a child-friendly investigation environment. It is specifically designed to create a comfortable, safe investigation environment for children. This helps reduce children's anxiety. Children will be less worried, they will be confident, willing to provide information, and of course, during the interview process, the authorities, as we know, it is not easy to obtain information, but through the methods we have put in place, the expertise we have, with adequate training by our officers, it helps. Our approach is a trauma-based approach. Dato' Mr Speaker, a little addition, yes. A trauma-based approach means that at the CIC, we adopt a trauma-informed approach that takes into account the emotional and psychological impact experienced by children. The interview techniques used are gentler, and trained officers are able to recognise signs of trauma in children in order to avoid placing more stress on children. This means that what we are applying at this time is very effective, and we use modern forensic techniques, and of course the training for our officers is professional training. We also have a multidisciplinary approach. This means that the function of the CIC is as a platform for collaboration between various parties: police, social workers and psychology experts. This approach ensures that every aspect of children's needs receives attention, from their welfare through to the collection of valid evidence, this. And there are many successes that we have achieved. Of course, it reduces children's anxiety in giving statements, and the evidence we obtain from this process will be more robust and effective, and I am confident it helps greatly.

For the information of the Honourable Member, if we look at the process, there are many steps. Among the steps we take before an interview, we first conduct an initial assessment. We assess the child's emotional level, age, ability to communicate, and the interview location, which are all assessed before the interview process. During the interview there is also its process. Interviews are conducted only by trained officers, for example, using a child-friendly approach. Then we also take into account what processes we carry out after the interview, including psychological support. The CIC is a special centre for recording children aged 18 in this alternative way. If a child aged 18 can give evidence consistently. This means that if they are under 18, they can give evidence consistently, and we use that method. But this is a special centre for recording children under 18 as an alternative. What is important is that we constantly improve our capabilities from time to time, and we hope we can continue to play our role in ensuring that children are given the best protection. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. The next question, I invite Tuan Ir. Ts. Haji Khairil Nizam bin Khirudin, the Honourable Jerantut, to ask.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Waalaikumussalam.

Thank you to Dato' Mr Speaker. Good morning, Minister. My question number 2.

Khairil Nizam bin KhirudinPAS · PNJerantut · questionEN

2. Tuan Ir. Ts. Haji Khairil Nizam bin Khirudin [Jerantut] asks the Minister of Transport to state what are the latest investigation findings regarding the fatal accident that claimed seven lives and injured 33 people at KM204 of the North-South Expressway, and what action has the ministry taken against the lorry company whose tyre came off?

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister of Transport to reply.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Mr Speaker, peace be upon you, Malaysia MADANI greetings. For the information of the Honourable Members, following the accident incident at Kilometre 204 of the North-South Expressway, the Ministry of Transport (MOT), through its agencies, namely the Malaysian Institute of Road Safety Research (MIROS), the Road Transport Department (JPJ) and the Land Public Transport Agency (APAD), has carried out an investigation into the incident. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Sitting]

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

The MIROS investigation found that there were several factors that influenced the accident, including vehicle management, driver management and occupational safety, road and environment. JPJ has also carried out an audit, namely the JPJ Inspection and Safety Audit (JISA), which aims to check the level of compliance of the companies concerned with the requirements of the Industry Code of Practice on Safety (ICOP). The results of the audit on all commercial vehicles involved in the accident are as follows: (i) Yinson Transport (M) Sdn. Bhd., JISA audit result compliant at 77 percent; (ii) V Travel Sdn. Bhd., JISA audit result failed at 11 percent; and (iii) SNC Maju Enterprise, JISA audit result failed at 22 percent. In terms of legal action, the company Yinson Transport (M) Sdn. Bhd., the owner of the lorry whose tyre came off before the accident, has been charged in the Alor Gajah court under the Land Public Transport Act 2010 as follows: (i) section 57(1)(b)(vi), that the weight with load of any goods vehicle must not exceed the maximum stated while operating a goods vehicle service. If convicted, the licensed operator may be fined not less than RM1,000 but not more than RM500,000 or imprisoned for a period not exceeding two years or both; and (ii) section 80, the lorry belonging to the company has also been seized and an application has been made for forfeiture by court order. The APAD investigation found several regulatory non-compliances under Act 715 as follows: (i) offence of not complying with section 58(1)(b)(i) of Act 715, namely driving above the speed limit; (ii) section 58(2) for not complying with the requirements of industry code of practice; (iii) offence under section 42(2) for not complying with the requirements of industry code of practice; and (iv) section 42(1)(b)(i), namely driving records exceeding the speed limit. In addition to court action against Yinson Transport (M) Sdn. Bhd., the vehicle permit of the vehicle whose tyre came off has also been cancelled with effect from 11 February last, due to driving records exceeding the speed limit. Additionally, the company V Travel Sdn. Bhd. had all its vehicle licences suspended from 18 February until 19 March for failing to comply with the safety ICOP requirements. Meanwhile, the company SNC Maju Enterprise had its operator licence suspended for 30 days for failing to comply with ICOP, and its vehicle permit was cancelled due to driving records exceeding the speed limit. This matter was decided in the Licence Revocation and Suspension Committee Meeting dated 3 March last.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

For the information of the Honourable Members, to curb incidents like this, MOT has set up a special task force involving various agencies, as well as cooperation from other enforcement bodies such as PDRM, to implement strategic measures to address safety and accidents involving heavy vehicles. The main action that has been drawn up through this PPK is to intensify integrated and effective enforcement activities, including the implementation of high-speed weigh-in-motion. In addition, improvements to procedures and technical aspects, periodic inspections by PUSPAKOM are given emphasis on critical components such as the brake and tyre systems, as well as monitoring by JPJ's Automotive Engineering Division, which provides courses to main branches of high-level vehicle inspection. MOT will also implement improvements to the Industry Code of Practice on Safety by providing certification to trained persons through the occupational safety and health coordinator course. Periodic monitoring of ICOP compliance by heavy vehicle operating companies, and enhancing advocacy among operators in the use of global tracking systems and dashboard cameras to assist in monitoring ICOP compliance more effectively and holistically. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Jerantut.

Thank you to the Minister's side. Congratulations to the ministry for conducting a transparent, detailed investigation and punitive action against the lorry company involved. However, as a concern for all of us, the audit shows failures at the level of that lorry company. So, this is something I would like to ask the ministry. Considering the increase in heavy vehicle statistics during peak hours on highways, and considering the actions that will be taken by the ministry against other lorry companies, my question is, is there any policy-level or new, stricter legislation to ensure this does not happen again. Moreover, we will be celebrating Aidilfitri in the next day or two, which may further increase the number of vehicles on the highways.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, Honourable Jerantut. There are indeed various approaches we are implementing, including prohibitions on heavy vehicles at certain times, and of course during the festive season, we have two days when all heavy vehicles are completely prohibited, except for a few critical sectors. That can ease or reduce heavy vehicles on the road during the festive season.

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

Tuan Loke Siew FookDAP · PHSerembanEN

Secondly, of course in terms of reviewing the law to make it more effective. That is being carried out, and we are looking at it in the Ministry of Transport. As I have said before, we also want to place

Tuan Loke Siew FookDAP · PHSerembanEN

responsibility not only on transport companies, but cargo owners must also have liability and responsibility.

Tuan Fong Kui LunDAP · PHBukit Bintang

[Bangun]

Tuan Loke Siew FookDAP · PHSerembanEN

If the cargo owner deliberately asks transport companies to carry more load, they may also need to be subject to action. That is what we mean: not only drivers must face action, not only transport companies must face action, but also the owners of the cargo being carried, especially mining companies, for example sand companies. We know that most sand lorries, for example, are overloaded, but our transport companies, the cargo owners ask them to carry more at a low cost. So, that is what we see from a legal perspective; it must also involve them. Cargo must also have responsibility. Apart from that, of course we also have a policy to encourage the use of rail instead of heavy vehicles or lorries on the road. When the ECRL is completed, of course we will make several policies, especially for the East Coast, as there is already an alternative. There is no need to use lorries to carry goods to the East Coast anymore, rail can be used through the ECRL. So, various incentives will be provided to ensure that more cargo owners or transport companies use rail as an alternative to heavy lorries. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Bukit Bintang.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Thank you, Madam Speaker. Supplementary question. I would like to ask the Honourable Minister, does the government intend to carry out special operations to inspect lorries moving on all highways and all roads, also for the safety of highway users, and to take firm action against lorry operators. Please explain.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, Honourable Bukit Bintang. Indeed, special operations are conducted from time to time. Enforcement is indeed periodic. I have directed the JPJ Enforcement Division to carry out enforcement at all times, not only during special operations but also during normal times. The Director of Enforcement has been given a mandate to take whatever action is necessary, and they receive information from time to time. Surveillance has been carried out in hotspot areas and so on. Operations have indeed been conducted so strictly that some people have sighed and complained that enforcement is now heavier, but we have no choice except to carry out more stringent enforcement. Non-compliance is indeed very high, and for us, public safety is the priority. I have indeed given full support to JPJ to carry out its operations, and of course, there are also actions being taken to ensure

Tuan Loke Siew FookDAP · PHSerembanEN

the transport companies comply with the audit. That is why, if we look at last year's statistics, so many companies have already been audited and many have also been suspended, and this sends a strong message to transport companies. Yes, we suspend their operations, and there are indeed huge losses. If it is a 30-day suspension, imagine all their vehicles unable to move for 30 days. His contracts with these companies will be affected, but we have no choice.

Tuan Loke Siew FookDAP · PHSerembanEN

We want to send a strong, clear message to transport companies to give priority to road safety. On this matter, I feel there is no compromise. I hope all Honourable Members support this firm action so that we give a warning to all parties to safeguard the safety of the public. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Puan Vivian Wong Shir Yee, Sandakan.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Madam Speaker. Sandakan question number three.

Vivian Wong Shir YeeDAP · PHSandakan · questionEN

3. Puan Vivian Wong Shir Yee [Sandakan] asks the Minister of Works to state when the ministry intends to carry out a Road Safety Audit on Federal Route 22 in Sandakan, namely Jalan Utara Sandakan, particularly in the Batu 5 area where road accidents frequently occur.

Dato Sri Alexander Nanta LinggiPBB · GPSMinister of Public Works · KapitEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Sandakan for the question. Mr Speaker, for the information of the Honourable Member for Sandakan, the Road Safety Audit consists of five main stages carried out for a road project. Each stage aims to identify and reduce the risk of road accidents before, during and after construction. It aims to ensure that the design and operation of the road meet safety standards and minimise the possibility of accidents occurring. As for the Road Safety Audit that the Honourable Member refers to, it falls under stage five, which is divided into two: after construction or on existing roads that have been in operation for a long time. Therefore, this Road Safety Audit is carried out to identify safety risks that are found from time to time. As for the location referred to by the Honourable Member for Sandakan, namely Jalan Kota Kinabalu, Sandakan, the Batu 5 area is on Federal Route FT022, which is in a bend area. Based on a check, the JKR Sabah has carried out street light repairs at this bend area in 2024 and has also liaised with the Sandakan Municipal Council regarding the issue of tree branches blocking the lighting from the street lights. Along with this, JKR Sabah will add suitable facilities such as appropriate signboards at this bend area.

Dato Sri Alexander Nanta LinggiPBB · GPSMinister of Public Works · KapitEN

For the information of the Honourable Member as well, the Ministry of Works together with the Public Works Department is always committed to ensuring that the condition of the roads is always in a safe and comfortable state for road users. That concludes my reply. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Sandakan.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Dato Sri Minister. For my supplementary question, apart from the weather, the condition of the road is a main factor in road safety. This includes roads that are flat without potholes, clear road markings and also street lights that are bright and functioning. So, my question is, what is the maintenance schedule for street lights along Federal Route 22 and how much allocation is provided each year? If there is damage, is there an existing budget or is it necessary to apply for additional funds, and what was the total cost spent last year on road maintenance work, including all street lights? Thank you.

Mr Speaker, I have been told by my colleague, the Minister of Food Security, to convey congratulations because he is a newlywed. Is it true? Congratulations. Okay, this is good news. So, the answer is... [Laughter] Okay, supplementary question. There are many – many just now, yes. Mr Speaker, for some of the earlier questions, the maintenance schedule for street lights along Federal Route 022 can only be carried out once or twice a month due to a shortage of manpower or staff at the district JKR.

[Bangun]

These electrical works can only be carried out at night. Why at night? Because we want to make sure whether the lights are really faulty or have not yet reached the point where they need to be replaced, and so on. Okay. So, Mr Speaker, there is a budget. It is indeed allocated every year, depending on applications by JKR Sabah. This is important, yes, from JKR Sabah based on on-site needs. If long-term repairs are necessary, JKR Sabah will apply for additional allocation. Long-term repairs cover work such as replacing cables and components that have reached the end of their lifespan. So, applications for additional funds are only for long-term repairs, replacement of underground cables and components that have reached their expiry period. So, for the information of the Honourable Member as well, the maintenance of district roads in Sandakan, route R22 Kota Kinabalu, Sandakan, is based on the Road Maintenance Estimate, or APJ, recommended by JKR Sabah according to the state priority list. This is important for the Honourable Member to know. Please liaise with JKR Sabah. So, likewise, the breakdown of what has been spent on Federal Roads in the Sandakan District is as follows.

For routine work scope, it briefly covers pavement works, grass cutting, shoulder maintenance, road furniture maintenance, bridge and culvert maintenance and drain maintenance. So, Honourable Member for Sandakan, this routine work is always carried out from time to time according to the contract scope that has been set. This is because under the company concession, it is there even if not applied for. So, for the year 2023 to 2025, Mr Speaker, routine work amounted to RM7.71 million for that area. So, Honourable Member for Sandakan, the Ministry of Works (KKR) also gives attention to periodic pavement maintenance works. So, apart from pavement, there is also slope maintenance and electrical works in the Sandakan district. From 2023 to 2025, the works carried out are as follows. Periodic pavement RM53.149 million for 25 works or along 39.2 kilometres. For periodic non-pavement works, RM6.6 million has been spent on 12 works. For electrical works, RM1.109 million for six works. For slopes too, there is RM8.78 million for three works. So, that is all that is specifically for the area referred to by the Honourable Member. That concludes my reply. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Jerlun.

Honourable Minister, Madam Speaker, the original question from Sandakan concerns the Road Accident Audit, and I think road safety is the most important aspect that needs to be audited to prevent accidents from occurring, not only in Sandakan but throughout the country. The MOT, in a press statement, did mention, "The latest statistics show that 5,029 fatal accidents occurred and 5,364 people died from January to October 2024". The largest group is motorcyclists, at 65 per cent.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Soalan.

My question: this Road Safety Audit aims, among other things, to identify that the design and construction of new roads must follow the specifications approved by the Ministry of Works. My question: does the government intend to act immediately within 24 hours after receiving public e-complaints, to ensure that road infrastructure elements such as road signs, traffic markings, street lights and traffic signals that are damaged are repaired within 24 hours? Second, does it intend to document road practice codes strictly and formally for improvement in order to prevent accidents from occurring?

Lastly, does the government intend to establish special lanes for motorcyclists on all highways in our country to prevent road accidents from occurring? Thank you.

Alright, thank you, Honourable Jerlun. This question is related to the original question because it concerns our standard quality of roads. Thank you, Honourable Jerlun. Indeed, all three issues raised by Jerlun are being addressed by us and there is a certain direction. Firstly, regarding the accident study that has been conducted, and I know this is from MIROS. So, we are informed that in that study, I don't know whether the Honourable Member knows or not, it is understood that accidents occur not so much because of road quality. Only 13 per cent is due to roads that are damaged and so on, 80 per cent is due to negligence of car or motorcycle drivers. This is the fact in the MIROS study just now, Honourable Member; I am not pointing fingers at road users. We must address this issue too. That is why I like us to have advocacy for road users so that they use the roads with the best code of ethics, which is set for safety. Secondly, now the ministry, the KSU, will carry out a programme for us to do PCA on all roads. This PCA is for us to identify, not because we see that a road looks damaged, but we need to look more deeply. If we do patching and so on, we are treating the symptoms. We want to treat the disease. So, it looks damaged on the surface but underneath it is already more damaged, so we have to – that is why the Honourable Member's suggestion is indeed correct, we need to carry out a more comprehensive investigation so that we can know what we should actually do to ensure that the quality of the road is at the best level, because there are road standards.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Minister, summarise your answer. Summarise the answer.

Brief. This is two. The third just now...

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Laluan motosikal.

Laluan khas.

Special lane. Special lane for the Honourable Member, we indeed want motorcycle lanes to be provided, but because of the old projects it is difficult for us to ensure that we build new motorcycle lanes, because there has already been land acquisition and so on. Sometimes we cannot even acquire land, and if it is multi-storey it is even more difficult. But our direction going forward is that we indeed want to emphasise that there should be special lanes for motorcycles. Only, the effect will be in terms of finance, it will affect costs that will increase, but when we think about and weigh costs and lives, lives are indeed what matter. So, that is our direction moving forward, to ensure that those who use these motorcycles, we help them to have lanes. But this is a major issue, the increase in costs when we build or implement that road. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Datuk Dr. Nik Muhammad Zawawi bin Haji Salleh, Pasir Puteh.

Thank you, Deputy Speaker. My question number 4.

Nik Muhammad Zawawi bin SallehPAS · PNPasir Puteh · questionEN

4. Datuk Dr. Nik Muhammad Zawawi bin Haji Salleh [Pasir Puteh] asks the Minister of Agriculture and Food Security to state the mitigation measures taken by the ministry to ensure the agricultural sector is not affected during the flood season, especially involving states on the East Coast.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

Thank you, Honourable Datuk who asked. Mr Speaker, the Ministry of Agriculture and Food Security (KPKM) has taken several proactive mitigation measures to reduce the impact on the agricultural sector during the flood season, particularly on the East Coast. Among the main measures implemented, the first is maintaining agricultural irrigation and drainage infrastructure such as drainage systems, pump houses and retention ponds. For 2025, a total of RM55 million has been allocated for the maintenance of agricultural irrigation and drainage systems throughout the country under KPKM, with RM14.8 million channelled specifically to the East Coast state. Second, ensuring that mobile pumps are operating in optimal condition in paddy planting areas to pump water out. Third, ensuring that all tidal control gates in paddy planting areas function properly so that water control is more effective in maintaining the minimum level at the tidal control gates. Unless, Datuk, there is an extraordinary flood, that is different. Like the 2014 flood, pumps or no pumps, the pumps were swept away. Fourth, implementing climate-smart agricultural initiatives with a focus on three main aspects. Increasing the resilience of agricultural systems to climate change, reducing greenhouse gas emissions and ensuring sustainable and competitive food production. This approach aims to address the challenges of climate change while ensuring agricultural productivity continues. I see in Rantau Panjang there are vegetable growers who have built their vegetables high, but there was an extraordinary flood and the water reached the vegetables that were hung up. This means that if there is an extraordinary flood, it is usually beyond what we expect. Fifth, developing weather-resistant crop varieties and innovative agricultural technology. An international collaborative project by researchers and agricultural development, namely MARDI, has produced flood-tolerant rice varieties, using the submergence gene that can survive under water submergence for 14 days during the vegetative stage. This variety is expected to be introduced in 2028. It can be submerged for 14 days and still survive. Sixth, strengthening the infrastructure database system by using technologies such as geographic information systems. This database system can be expanded

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

through collaboration with the National Disaster Management Agency, the Malaysian Meteorological Department and the Department of Irrigation and Drainage Malaysia to assist farmers and plan planting schedules so that the risk of damage to farmers' produce can be reduced. For example, if the forecast says flooding will occur in October like last year, but suddenly it happens in September, then the paddy will be submerged in Pasir Mas, in Tumpat, in Kedah, which is a loss equivalent to five million sacks. Not five million sacks of water carried away, but that is the equivalent. So, situations like that, that is why we hope our weather forecasts can be improved so that they are forecast more accurately. To be 100 per cent accurate is difficult, but at least the margin should not be far off so that we can see when paddy is submerged, after two days it is already destroyed. If the paddy has not yet ripened, if it is submerged for two or three days it can still survive. PKPM is committed to implementing mitigation measures in dealing with floods to ensure that the country's agricultural sector remains sustainable. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Pasir Puteh.

Thank you, Datuk Seri Minister, for giving the reply. I have studied the reply. However, I want to mention that in this agricultural field, there are two things that meet. Paddy needs stagnant water, watermelon does not need stagnant water. On the flood issue, I do not want to touch on it, the floods are not only a problem for paddy, humans can also drown. But I want to say that...

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan soalan.

...Allocation for paddy, to what extent is the government prepared to build adequate drainage, especially in the Pasir Puteh area? The cucumber planting area, the drainage from the orchard area all the way to the Sungai Kemasin again, from the orchard. As for the orchard to drainage, that is handed over to the farmers. If possible, the government should focus on the Pasir Puteh area because they face huge losses not only in the monsoon season, when rain falls, they face losses. To what extent is the government prepared to provide compensation outside the flood season? Ordinary rain and it is submerged. Thank you.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

Thank you, Ustaz Datuk Dr. The Ministry of Agriculture and Food Security has implemented several key initiatives to ensure that agricultural produce can continue to be produced, even in extreme weather conditions. We know that Chinese cucumber or watermelon, it ripens, matures, during dry times. Just now, like sugarcane for example, it wants a damp place. So, planters should be smart in choosing the places to plant, and we know Kelantan has vast land. There is land that is dry, there is land that is often submerged by floods. We hope farmers can choose crops that are suitable for the weather in their places.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

In 2025, KPKM received approval for two new projects with a project cost ceiling of RM16 million to implement projects to upgrade floodgates and pump houses for areas outside the granary. This includes the Pasir Puteh area. Specifically for the Pasir Puteh area, I will provide it in writing. As for flood victims, whether fishermen or farmers, if there are any who were left out, who are affected but the government has not yet given assistance, we hope the Honourable Member will give that list to me. I will take action immediately. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Betong.

Thank you, Madam Speaker, thank you Minister. After hearing the answer from the Minister just now, I would like to ask a question regarding one of the mitigation measures. Just now it was stated there is a data system that has been obtained. Is this data system open for use in research and also for planning for the future? For flood victims, is there a mechanism to ensure that claims from affected farmers, where their assets or crops have been damaged, are verified as valid and correct? Thank you.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

For example in infrastructure, we at the Ministry of Rural and Regional Development (KPKM) greatly appreciate the very good cooperation, especially with the Sarawak State Government, particularly in agriculture. As for claims if damage occurs and so on, we have a mechanism whether it is completely destroyed, or if it is only half destroyed, and compensation will be calculated by our officers and verified by several parties. Therefore, assistance will be provided wherever it occurs, whether the place is a plantation in private form or a small company, cooperative entrepreneur and so on. The Ministry will continue to provide assistance at the rate that has been set by the Ministry. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Mr Ramkarpal Singh a/l Karpal Singh, Bukit Gelugor.

Thank you, Madam Speaker. My question is number 5.

Ramkarpal Singh a/l Karpal SinghDAP · PHBukit Gelugor · questionEN

5. Mr Ramkarpal Singh a/l Karpal Singh [Bukit Gelugor] asks the Minister of Finance to state whether the government intends to introduce appropriate guidelines to address the problem of increasing private medical insurance premiums, given that the increase will burden the public, especially the M40 group. If so, state those guidelines.

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

Thank you, Madam Speaker, thank you, Honourable Bukit Gelugor. In Malaysia, medical and health insurance and takaful products (MHIT) are offered with premium rates that are reset periodically. Rising medical cost inflation and higher utilisation of healthcare services are the main causes of the increasing MHIT premiums. When resetting premiums, the insurers and takaful operators (ITO), with permission,

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

are required to comply with the rules set out in the MHIT business policy document. Based on this policy document, ITOs may only reset premiums when actual claims costs increase continuously and exceed the threshold value, with permission, determined in advance in the ITO's internal practice. ITOs are also not permitted to reset premiums solely to increase ITO profits. Nevertheless, mindful of the financial burden faced by the people, the government, through Bank Negara Malaysia, has also taken several interim measures to contain the impact of the MHIT premium increases. The government understands that these interim measures are only temporary and that an integrated and comprehensive initiative must be implemented to address the problem of medical cost inflation. Therefore, all stakeholders, including the Ministry of Health Malaysia, the Ministry of Finance, Bank Negara Malaysia, private hospitals and ITOs, are working together to expedite the implementation of initiatives to curb the rate of medical cost inflation. This effort is based on five main pillars as follows: (i) increasing cost transparency, including publication of prices of medicines and common health services and estimation mechanisms for the rate of medical inflation; (ii) phased implementation of a diagnosis-related group (DRG) payment model by private hospitals, by KKM, including studying the need to amend the Private Healthcare Facilities and Services Act 1998 (Act 586), in line with the announcement by the Honourable Prime Minister in December 2024; (iii) transformation of MHIT product design through development of basic products with more sustainable features; (iv) expanding affordable health options through the KKM Partners initiative and the development of non-profit hospitals; and (v) implementation of electronic health records, with permission, electronic medical records (EMR), to reduce duplication of diagnostic tests, enabling cost savings and operational efficiency. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Bukit Gelugor.

Thank you, Deputy Minister. My supplementary question: several reports predict that medical insurance premiums will rise between 40 and 70 per cent this year, which will benefit insurance companies but burden the people, especially the M40 group.

Among the causes of these premium increases is fee for service, with permission, at private hospitals, where there is said to be significant over-charging by medical service providers or, with permission, medical service providers. Given this situation, does the government intend to enact new legislation to introduce new payment methods to replace fee for service at hospitals in order to reduce treatment costs, which would also reduce medical insurance premiums? Thank you.

Puan Lim Hui YingDAP · PHTanjongEN

Thank you, Madam Speaker, thank you, Honourable Bukit Gelugor. As explained earlier, the increase in MHIT premiums is driven by rising medical cost inflation and higher utilisation of healthcare services. Between 2021 and 2023, the cumulative increase in total MHIT claims was 56 per cent, while over the same period, the cumulative increase in total MHIT premiums collected was only 20 per cent. Therefore, the government is working with all stakeholders to find long-term solutions and will prioritise comprehensive health reform to address the issue of medical cost inflation and charges at private hospitals. One important strategy to address the issue of over-charging, as mentioned by the Honourable Member earlier, is through the targeted implementation of a diagnosis-related group payment model at private hospitals by KKM. To implement the DRG payment model, the government, through the Ministry of Health, will study the need to amend the Private Healthcare Facilities and Services Act 1998, in line with the announcement by the Honourable Prime Minister. For the Honourable Member's information, DRG is a payment mechanism for healthcare services that is more modern and holistic compared with the existing payment mechanism, namely payment of fees for services or, with permission, fee for service. Compared with fee for service, DRG-based payment accompanied by clinical quality monitoring will encourage efficiency because hospitals are encouraged to provide more focused and effective treatment, avoid unnecessary procedures and tests, and at the same time ensure patients receive quality care. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Kulim-Bandar Baharu.

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

Thank you, Deputy Speaker, for giving the floor to Kulim and not to Tanjong Karang. Honourable Member, don't be angry. Today is the last day, and I have six questions. May I, Mr Speaker?

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Only one supplementary question.

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar Baharu

Hari terakhir.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Ask quickly. Time is up.

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

Alright. Explain how insurance companies and takaful operators (ITO) are allowed to raise premiums on medical and health insurance and takaful products drastically even though ITOs have already recorded profits? Why can ITOs not use some of their profits to absorb the premium increases? Thank you. Only one question.

Puan Lim Hui YingDAP · PHTanjongEN

Thank you, Madam Speaker. Thank you to the Honourable Member. The premium increase that has occurred is due to high medical cost inflation. Generally, premium adjustments occur when MHIT claims costs rise continuously to the point where premiums are at risk of no longer being sustainable. For the Honourable Member's information, the overall MHIT portfolio recorded losses in 2023/2024. If MHIT products continue to remain at an unsustainable level, there is a risk that these products will no longer be offered by most ITOs in the future, which will in turn add pressure on the public health service sector. Profits from other portfolios generally should not be used to absorb losses from the MHIT portfolio because this measure could make premiums for other products, such as life or education insurance, more expensive and unfair to policyholders who do not purchase MHIT. For example, policyholders who only buy life protection also have to pay high premiums to cover MHIT claims even though life protection products are not affected by medical cost inflation. Nevertheless, the government is sensitive to the complaints of the people on this issue. Therefore, the government, through the Ministry of Health Malaysia, will take integrated action together with other stakeholders in seeking long-term solutions and health reform to address the issue of medical cost inflation and private hospital charges. This includes improving cost transparency for medicines and benchmarking common medical costs. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Mr Mohamad Shafizan bin Kepli, Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Madam Speaker. My question is number 6.

Mohamad Shafizan bin KepliPBB · GPSBatang Lupar · questionEN

6. Mr Mohamad Shafizan Haji Kepli [Batang Lupar] asks the Minister of Rural and Regional Development to state whether there is any large-scale plan to upgrade the old and dilapidated buildings of KEMAS tabika and tadika, especially in Sarawak and Sabah, similar to efforts to eliminate dilapidated schools and clinics.

Datuk Hajah Rubiah binti Haji WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

Peace be upon you, and God's mercy and blessings. Thank you, Mr Speaker. Thank you, Honourable Batang Lupar, for the question. Mr Speaker, the Ministry, through the Community Development Department (KEMAS), is always alert to and takes serious note of the need to improve and upgrade KEMAS tabika and taska buildings throughout the country, especially in Sarawak and Sabah, which still have many old and unsafe buildings. This year, KEMAS was approved a special allocation of RM40 million to carry out upgrading and repair works on premises, including purchase of equipment for KEMAS tabika and taska nationwide. Of this amount, KEMAS Sarawak and KEMAS Sabah were each allocated RM4 million. The allocation was given by taking into account the status of the buildings, whether owned by KEMAS. To ensure that KEMAS tabika and taska can operate safely and in a conducive environment, the Ministry, through KEMAS, always carries out regular monitoring of the physical condition of buildings through management monitoring conducted throughout the year. For the Batang Lupar Parliamentary constituency, KEMAS has approved RM460,000 for three tabika repair projects in 2025, namely Tabika KEMAS Kampung Sungai Ladong amounting to RM130,000, Tabika KEMAS Kampung Entanggor, Sebuyau also RM130,000, and Tabika KEMAS Kampung Tambak, RM200,000. Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you to the Deputy Minister for that answer. I would also like to record my appreciation and congratulations to KEMAS for having received the Reader's Digest Gold Trusted Award five times in a row. Certainly, good and safe building conditions are very important for creating a conducive teaching and learning environment for our children. Besides that, the competence of teachers also plays an important role, especially in early childhood education. Hence, I would like to ask the Ministry, apart from upgrading dilapidated and old buildings, whether the Ministry, through the KEMAS Department, has set a requirement to upgrade the qualifications of teaching staff at KEMAS tabika from the previous diploma qualification to a bachelor's degree, on par with teachers under the Ministry of Education Malaysia? Thank you.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Thank you, Mr Speaker. Thank you, Honourable Batang Lupar, for the supplementary question. This supplementary question is somewhat deviating from the main question because the main question was about upgrading tabika buildings, but the supplementary question is about KEMAS community educators. Nevertheless, I will answer.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

The Community Development Department (KEMAS) plays a leading role and provides early childhood education in Malaysia through its tabika and taska programmes. To ensure the level of professionalism and quality of education continues to be strengthened, KEMAS is currently studying the harmonisation of qualifications for community educators from grade S5 to grade S9 so that the benefits can be enjoyed comprehensively by all levels involved. In this regard, an engagement session is being carried out to gather views and proposals related to this matter. At the next stage, the results of the study and discussions will be brought to the Ministry before being submitted to the Public Service Department (JPA) for consideration, subject to the financial implications for the government. The KEMAS Department will refine the proposal to upgrade the qualifications of teaching staff at KEMAS tabika from diploma to bachelor's degree, on par with teachers under the Ministry of Education Malaysia. This proposal is in line with the government's aspiration to strengthen early childhood education. For the Honourable Member's information, 9,582 KEMAS community educators currently hold diploma qualifications. Meanwhile, 1,271 have obtained bachelor's degrees. These figures reflect the high level of academic qualifications among teaching staff, and at the same time show KEMAS's commitment to ensuring the quality of early childhood education continues to be strengthened and that teaching staff are more knowledgeable and skilled. Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Tumpat.

Thank you. Peace be upon you, and God's mercy and blessings. In connection with that question, I would like to ask whether the process of upgrading schools or tabika and tadika in Sabah, Sarawak and Peninsular Malaysia also meets the minimum infrastructure standards for early childhood education as outlined in the Malaysian Children's Education Development Plan? First. Second, does the Ministry intend to develop a rural pre-school master plan that is in line with the National Child Policy and the National Education Policy for tadika and KEMAS tabika throughout the country? Thank you.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

Thank you, Honourable Tumpat, for the supplementary question. It is indeed the aspiration of the Ministry, especially KEMAS, to provide facilities, especially building facilities, whose standards are aligned with the Ministry of Education. That is to say, based on the National Education Strategic Plan. However, this matter can only be implemented for new buildings. That is to say, the implementation of new buildings. For upgrading programmes, we

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

still use the existing scope based on the allocation we receive and also the repair works that we need to carry out.

Datuk Hajah Rubiah binti Haji WangPBB · GPSKota SamarahanEN

However, there are certain matters that we can consider for upgrading to – in accordance with the standards of the plan that has been set. We, the Ministry, are committed to ensuring these facilities are aligned with the standard requirements provided by the government at this time. Thank you, Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Dato' Dr. Hj. Alias bin Razak, Kuala Nerus.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Peace be upon you, and God's mercy and blessings. Thank you, Mr Speaker. My question is number 7.

Alias bin RazakPAS · PNKuala Nerus · questionEN

7. Dato' Dr. Haji Alias bin Razak [Kuala Nerus] asks the Minister of Health to state: (a) the statistics of medical assistants (MA) and nurses serving in government hospitals by state from 2015 to 2024; and (b) the justification for increasing nurses' working hours from 42 hours a week to 45 hours a week, and the extent to which this increase in working hours is expected to create pressure on nurses on duty.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Mr Speaker. Thank you, Honourable Kuala Nerus. This question has already been answered repeatedly by the Ministry of Health, and also on 25 February last, the Honourable Minister also answered the questions raised during the debate on the Royal Address.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

So you may summarise if it has been answered before.

To answer the question raised by the Honourable Kuala Nerus regarding the statistics of medical assistants (MA) and nurses serving in government hospitals by state from 2015 to 2024. I will not answer this question orally and have already submitted the answer in writing. Nevertheless, the data provided is specific to MA officers and nurses at hospitals, and does not take into account officers who are in and filling positions in institutions under the MOH headquarters, group posts, reserve posts, and also in training centres such as the National Cancer Institute and the Institute of Respiratory Medicine. Regarding the second question raised, the justification for increasing nurses' working hours from 42 hours to 45 hours. The implementation of the total shift working hours of 45 hours a week was introduced through the Public Service Remuneration System (SSPA) by implementing a 45-hour shift working time system.

Officers will be allocated one hour of rest time per shift. Handover of duties, passing over report, with permission, will be taken into account in shift working hours, where handover is done in the last hour before the end of the shift working hours together with the first hour of the next shift, and so on. Thirdly, ensuring officers obtain sufficient rest time and orderly handover of duties. For the information of Honourable Members, the MOH has been approved an extension of the interim period for exemption from the implementation of shift working hours in the MOH for a period of three months from 1 March to 31 May 2025. The MOH must ensure that shift working hours are complied with based on current regulations that take effect from 1 June. And also, this interim period is caused by the voices of Members of Parliament who want the MOH to discuss with the MOH, and the Honourable Minister is currently working on discussions with the JPA. Workload arises when members carry out duties beyond the capacity set by the job description of that member. The Ministry of Health Malaysia is very much aware of the workload of nurses and, in actuality, with permission. In fact, they have already been carrying out duties for more than 45 hours without counting rest time and passing over. Implementation of 45 working hours does not add to the workload, and the MOH will harmonise this with the SSPA provisions so that we can resolve it as well as possible. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Kuala Nerus.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Thank you Mr Speaker. Thank you, the Honourable Deputy Minister, for the fairly comprehensive reply. We are aware that the Ministry of Health (KKM) is experiencing a shortage of officers, including medical assistant officers and nurses. We at the JKPK Kesihatan were briefed last week on the vacancies that remain unfilled until 31 December 2024. Medical assistant officers number 3,682 and nurses number 14,731. The average fill rate is around 83 per cent. I think this figure is not that bad, and the Honourable Deputy Minister has already answered earlier that these unfilled vacancies are for new hospitals that are not yet completed. My supplementary question is, to what extent does the problem of maldistribution, or, with permission, maldistribution of the health workforce, particularly the establishment of medical assistant officers and nurses, exist between states and also between urban and rural areas? I am concerned that we are only discussing the high workload in the public health sector. But is the same thing happening across all KKM premises? The same shortage, or are there places with more staff and places with fewer staff? To what extent has KKM conducted a study on the distribution of this workload? Does KKM intend to establish a Health Service Commission to handle the distribution and recruitment of new staff on its own, as other ministries do, such as the Ministry of Education? It has an Education Service Commission for that. So...

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

...Will it establish a Health Service Commission to handle the distribution and recruitment of new staff on its own, as other ministries do, such as the Ministry of Education? It has an Education Service Commission for that. So...

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan soalan.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

...It will be – KKM knows better where roughly, it itself arranges its officers. Thank you Mr Speaker.

Thank you, the Honourable Kuala Nerus. A supplementary question that has indeed already been discussed. At this time, among the matters we intend to implement is holding a more frequent engagement session with Members of Parliament to obtain views from the grassroots. Also, one of the issues we have discussed is about maldistribution, and not only specific to medical assistant officers but also to nurses and medical officers, where we see that some facilities have already reached an optimum level and also have excess manpower, but in urgent areas such as in Selangor, Johor or Penang, they still face problems of distribution, excess manpower and shortage of manpower. Nevertheless, this maldistribution requires a very detailed study. We are working to create a dashboard that allows the Honourable Minister and also the top officers of KPM – KKM to see the state of this maldistribution by combining all the divisions of medicine, public health, practitioners – MA and also nurses. Only we are identifying how to harmonise the issues concerning workload, the issues concerning premises vacancies and also the issues of new premises that need to be filled with the required staff. And we are also studying what the actual projection is that KKM needs to cover the shortage or excess of these staff, because we are always talking about shortages, shortages, shortages, but we do not talk about how many staff are sufficient to sustain this health system. And we have also already improved several matters. Now we are mobilising officers because, if the Honourable Member looks at the data submitted, there are our staff who are in non-service or who are not doing clinical works, and we are mobilising them in phases. We are also waiting for the output of graduates, and we have roughly almost 10,000 graduates that we will produce within two or three years after this post-Covid period. And also – apart from that, we also look at the outfit – taking into account the additional work requirements based on the requirements – our ability to raise funds for the provision of emoluments.

And regarding the health commission, the matter has indeed been mentioned and is being pursued. Nevertheless, we are first intensifying discussions diplomatically between KKM and JPA (Public Service Department) to increase the addition of our staff at the Ministry of Health Malaysia. Thank you, the Honourable Member.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Bukit Bintang.

Tuan Fong Kui LunDAP · PHBukit BintangEN

Thank you Madam Speaker. Supplementary question. I would like to ask the Honourable Deputy Minister. How many medical assistants and nurses have resigned so far to join private hospitals and the National Family Services, and how many newly graduated nurses from the assistant nurse colleges have been taken into service in the public sector? Thank you.

Thank you, the Honourable Member. I have already answered this question a few days ago. I do not have detailed data. We will provide the answer again in writing.

Nevertheless, at this time we are carrying out the production of medical assistant officers and nurses. At present there are 821 current interim appointments that we are implementing, and also at our training institutions. We have roughly 4,367 trainee nurses for community nurses. Of these, 733 will become nurses, and 2,046 medical assistant officers are being trained and will become civil servants in the future. Thank you Dato' Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Dato’ Verdon bin Bahanda, Kudat.

Thank you Madam Speaker. My question is number eight.

Verdon bin BahandaBEBASKudat · questionEN

8. Dato' Verdon bin Bahanda [Kudat] asks the Minister of Economy to state the comparison of the poverty rate in the Kudat Parliamentary constituency in 2023 against 2024. What steps has the government taken to end the poverty rate in the Kudat Parliamentary constituency?

Dato Hajjah Hanifah Hajar TaibPBB · GPSDeputy Minister of Economy · MukahEN

Peace be upon you, and the mercy and blessings of Allah, and greetings of wellbeing. Madam Speaker, based on the Household Income and Expenditure Survey (HIES) 2022 published by the Department of Statistics Malaysia, the incidence of poverty in the Kudat Parliamentary constituency, Sabah, has decreased to 34.7 per cent, covering around 6,000 households in 2022, from 41.5 per cent in 2019. Data under the National Poverty Data Bank (eKasih) managed by the Implementation Coordination Unit, Prime Minister's Department, meanwhile recorded 4,283 poor households in Kudat as at 31 December 2024. Several medium- and long-term strategies to address poverty and inequality from various dimensions will continue to be focused on in the Mid-Term Review of the Twelfth Malaysia Plan, in line with the MADANI Economic Framework

Dato Hajjah Hanifah Hajar TaibPBB · GPSDeputy Minister of Economy · MukahEN

to empower the people. This includes increasing income, creating employment opportunities to improve the living standards of the poor, increasing access to social support such as education, health and housing to maintain a certain level of quality of life, and strengthening the resilience and well-being of poor households. [Mr Speaker presided over the Sitting] Specifically for the Kudat Parliamentary constituency, a total of RM35.94 million has been allocated under Rolling Plan 5 in 2025 under Development Expenditure for projects labelled as poverty. The main projects being implemented are as follows: (i) Rural Water Supply Project – upgrading the Kanibungan Water Treatment Plant; (ii) Rural Water Supply Project – distribution and reticulation system of Pitas District for Kalumpang, Dandum and Pantai Mukims; (iii) Upgrading of Jalan Radang and Jalan Telaga, Pitas; and (iv) People's Housing Project, Pitas. The Ministry of Economy also implements a poverty programme, namely the People's Income Initiative (IPR). A total of 110 participants in the Kudat Parliamentary constituency have joined the IPR, broken down as follows: (i) 67 participants in IPR Intan implementing agricultural projects; (ii) 4 participants in IPR Insan operating vending machines, with permission; and (iii) 39 participants in IPR Basmi Miskin Tegar involved in various income-enhancing programmes such as delivery services, car repair and food preparation. That is all, Tan Sri Mr Speaker, thank you.

Mr SpeakerEN

Alright, I invite Kudat.

Thank you Tan Sri Mr Speaker. Thank you for the answer, the Honourable Deputy Minister. As we know, Kudat is one of the Parliamentary constituencies with the highest poverty rates in Malaysia. Two districts with the highest poverty rates are the Pitas District and the Banggi District within the Kudat Parliamentary constituency. My supplementary question is, what plans does the Ministry of Economy have to further empower – to end the problem of poverty in this Kudat Parliamentary constituency in the Thirteenth Malaysia Plan (RMKe-13)? My second question is, what high-impact projects will the Ministry of Economy list in the RMKe-13 for the Kudat Parliamentary constituency that will be tabled in July? Thank you.

Mr Speaker

Silakan Menteri.

Thank you Tan Sri Mr Speaker. Honourable Kudat, I also do not have an answer to that. [Laughter] I have not yet confirmed what the plans will be for the upcoming RMKe-13.

I request a written answer, thank you.

If I receive it, God willing. Thank you.

Mr Speaker

Baik, silakan.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you Mr Speaker. I would like to ask about this poverty question. Will the ministry, in the near future or in the long term, set up a taskforce to address the problems of poverty mentioned in the areas we have heard of, such as Kudat, in Sabah, and Sarawak as well, and so on? Thank you.

Mr Speaker

Sila Menteri.

Datuk Haji Awang bin HashimPAS · PNPendangEN

[Speaking without loudspeaker].

Mr SpeakerEN

Yes, let him answer first. After that, I will call Pendang. Sabaq, okay? Okay, let me do my work, YB do your work. Okay, go ahead. [Applause]

Thank you Tan Sri Mr Speaker. We have short-term, medium-term and long-term strategies and initiatives. In terms of medium and long term, to address poverty and inequality from various dimensions, this covers increasing income, creating employment opportunities to improve the living standards of the poor, and increasing access to social support such as education, health and housing. I have also discussed with our division at the Ministry of Economy to re-evaluate the poverty areas on how we can help more than what we provide now. God willing, it will help better. Thank you.

Mr SpeakerEN

Alright. This is because of the economic problems of the people. What does Pendang want to ask? Go ahead. Now that's more like it.

Datuk Haji Awang bin HashimPAS · PNPendangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. [Laughter]

Mr Speaker

Silakan Pendang.

Datuk Haji Awang bin HashimPAS · PNPendangEN

[Laughter] With the data system we have prepared, with a fairly large amount to prepare the PADU data system, so with the introduction of this PADU data I hope it will provide a more precise definition of – concerning the B40 group across all Parliaments in Malaysia so that we can have accurate data. Does the government intend to review the Poverty Line Income (PGK) to make it more realistic with the current cost of living? In addition, when will the government table the PADU formula as the basis for a comprehensive and targeted strategy to eradicate poverty? Thank you.

Mr Speaker

Sila, Menteri.

Tan Sri Mr Speaker, I will answer in writing. Thank you. [Laughter]

Mr SpeakerEN

Alright. Next, I invite Tuan Rushdan bin Rusmi, Padang Besar.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

My question is number 9.

Rushdan bin RusmiPAS · PNPadang Besar · questionEN

9. Tuan Rushdan bin Rusmi [Padang Besar] asks the Minister of Agriculture and Food Security to state whether the ministry plans to introduce a specific policy or guideline to support the transition to the perennial rice cultivation system to enhance the country's national food security.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

Thank you, Padang Besar. Mr Speaker, the perennial rice cultivation system is the cultivation of hybrid rice varieties developed by China. Through this system, the rice planted can be harvested two to three times continuously. This system can change existing farming methods and is efficient, and can save time and cost of land preparation every planting season. For information, the Ministry of Agriculture and Food Security (KPKM) encourages the use of certified high-yielding rice seeds. Therefore, any introduction of hybrid rice seed varieties from abroad, including from China, must first comply with the procedures set by the technical agencies, namely the Department of Agriculture, Department of Agriculture and the Malaysian Agricultural Research and Development Institute (MARDI). This is to ensure that the rice seed varieties brought in comply with standards and are free from any disease and harmful pests to rice crops in the country. KPKM is very confident that the existing policy that has been developed can guarantee the safety and national food security. Thank you.

Mr SpeakerEN

Please, Padang Besar.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Thank you to the Honourable Minister for the detailed answer. The results of a five-year study at Yunnan University succeeded in creating the PR23 variety. They found that over the five years the rice was planted, it successfully produced consistent harvests for eight seasons, that is four consecutive years. Based on the potential of PR23 producing 6.8 tonnes per hectare each season for eight seasons, how does the ministry plan to increase the productivity yield of local rice, which still depends on the conventional planting system? Thank you.

Mr Speaker

Sila, Menteri.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

Thank you, Padang Besar. The Government takes note of the statement by the Honourable Padang Besar regarding PR23 producing 6.8 tonnes per hectare each season for eight seasons. However, I would like to inform that at this time, there are already rice cultivation areas in Malaysia

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

that can match the yield of PR23, and there are even areas that exceed 6.8 metric tonnes per hectare. The rice produced in these areas is through the implementation of the Large-Scale Smart Sawah Ala Sekinchan programme introduced in May 2023. Examples of areas under the Ala Sekinchan approach, the IADA Kemasin Semerak Pasir Puteh agricultural development area, yielded 6.8 tonnes per hectare. IADA Ketara Terengganu, seven metric tonnes per hectare. Kampung Gulau, Pendang, Kedah, seven tonnes per hectare, Kampung Lat Seribu, Perlis, 10.45 metric tonnes per hectare. Most importantly, we want to find ways, mechanisms, changes in attitude and so on, not to do it on a part-time basis, but we must have full focus. New varieties, for example Sabah still does not want to use new varieties, still with old varieties, whereas old varieties only reach a maximum of four tonnes, and new varieties, we can jump to seven, eight tonnes, even up to 10 tonnes, 11 tonnes is also available. Therefore, what is happening in China is being noted by MARDI and the government. If we want to start doing research on that matter, we can start, but what already exists must be expanded and carried out in a more systematic and modern manner, and will achieve what I mentioned earlier, several places that have been tried have achieved more than seven tonnes. Thank you.

Tuan Rushdan bin RusmiPAS · PNPadang Besar

Terima kasih.

Mr SpeakerEN

Alright, I invite Tuan Syed Ibrahim Syed Noh, Ledang.

Thank you Tan Sri Mr Speaker, Ledang question number 10.

Syed Ibrahim bin Syed NohPKR · PHLedang · questionEN

10. Tuan Syed Ibrahim bin Syed Noh [Ledang] asks the Minister of Home Affairs to state the latest status of the implementation of initiatives using modern technology such as artificial intelligence (AI) and data analytics to strengthen security surveillance and enforcement.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Thank you Tan Sri Mr Speaker, my friend, Ledang. The use of technology in national security control deployment plays an important role in ensuring that the security and sovereignty of the nation remain protected, taking into account increasingly complex and dynamic security threats. Therefore, the MOHA constantly explores the use of new technology, especially that based on artificial intelligence (AI), in strengthening national security surveillance and enforcement, namely through the development plan of the National Border Control System (SKSN). The proposed development of the SKSN system will be equipped with modern surveillance systems based on artificial intelligence (AI) technology and data analytics to enable rapid, real-time and continuous surveillance at all times in protecting the land and maritime borders of Malaysia for the sake of peace, stability and the sovereignty of the nation.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

For the information of the Honourable Member, the status of the SKSN development plan is as follows. The feasibility study on the development of the National Border Control System through the Malaysian Institute of Public Security Control (IPSOM) KDN, together with research teams and experts from public universities, was carried out on 7 September 2023 with a study period of 14 months and ended on 6 November 2024. The final outcome of the study has outlined four strategic pillars towards the implementation of the development of the National Border Control System, namely: (i) cooperation and data integration; (ii) asset strengthening; (iii) new border technology; and (iv) human capital empowerment. For the information of the Honourable Member, the findings of this feasibility study show that the development of the National Border Control System can be implemented in phases through a quick win approach, a period of less than six months. Short-term expectation, a period of less than one year, medium-term expectation, a period of between one and five years, and long-term expectation, a period of more than five years. Furthermore, a special taskforce will plan the design requirements, analyse the equipment and application requirements and subsequently determine the procurement process method along with the requirements for allocation applications under the Second Rolling Plan, Thirteenth Malaysia Plan for the development of the National Border Control System towards strengthening, surveillance and enforcement of our national security. Thank you.

Mr Speaker

Baik. Ledang.

Thank you, Deputy Minister, for the reply just now. I understand that the Ministry of Home Affairs (KDN), through what the Honourable Minister mentioned, has already implemented a facial recognition system using AI technology at the border entry points at Terminals 1 and 2 of KLIA and also at the Sultan Abu Bakar Complex in Johor, starting on 1 January. So my question is, what benefits and efficiencies have been achieved in terms of more efficient services to the people, and in enhancing integrity and national security. Are there any examples, and then, what is the government's assurance that with the implementation of this AI, we are not exposed to risks of security breaches, leaks or hacking. Thank you.

Mr SpeakerEN

Alright. Please, Minister.

Mr Speaker, we are aware that technology is constantly developing and change is always happening. That is why from time to time, the ministry, particularly the relevant agencies and departments, always enhance their capacity to face different challenges. If we look

at the country's borders, they are different. The borders in the North, namely Kedah, Perak and Pulau Pinang, differ in their conditions because of different topography.

Tuan Nurul Amin bin HamidPAS · PNPadang Terap

[Bangun]

If we also look at the Eastern border of Kelantan, the threats in Terengganu are also different. Likewise around the Southern area, namely Selangor, Negeri Sembilan, Melaka and Johor, and of course the border in Sarawak differs as well. That is why the approaches we use differ from one another and we always enhance our capacity. Of course, with the equipment we use, as announced by the Honourable Minister the other day, it improves again in terms of security control and can solve problems, especially by making things easier for the people in the areas concerned. Thank you.

Mr SpeakerEN

Alright, Padang Terap.

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

Thank you, Tan Sri Speaker. Honourable Minister, my question concerns the facial recognition system at the national border entry points that was mentioned earlier, namely specifically the Automatic Biometric Identification System (ABIS), which was announced previously by the government and is said to be used in 2026. So, what is the current status of this ABIS system? And, similar to the earlier question, can this system overcome the risk of personal data leaks? Just one more, will this AI application be used by the company Bestinet, which was given the AST by the government and which is very controversial now? Thank you.

Mr Speaker

Silakan.

Most of the questions raised earlier are outside the context of this, but I want to mention that we are indeed moving towards the use of AI, and the matters raised earlier I will provide in writing. Thank you.

Mr SpeakerEN

Alright. Honourable Member, the Question Time for oral answers has now ended for today. Minister, please. [Question Time for Oral Answers ends]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

Thank you, Mr Speaker. Mr Speaker, "I beg to propose that, pursuant to Standing Order 12(1), the Sitting today shall not be suspended at 1.00 p.m. and shall sit continuously until the Rang Undang-undang Pemerangkapan, Penggunaan dan Penyimpanan Karbon 2025, Rang Undang-undang Iltizam Kecekapan Perkhidmatan Kerajaan 2025 and Rang Undang-undang Kumpulan Wang Simpanan Pekerja (Pindaan) 2025 as at Nos. 1 to 3 in the Order Paper and Motions today have been debated and decided, after which the Sitting shall be suspended until a date to be determined." Thank you.

Mr SpeakerEN

Who supports?

Datuk Ugak anak KumbongPRS · GPSDeputy Minister of Digital · Hulu RajangEN

I support, Mr Speaker.

Mr SpeakerEN

Alright. Honourable Members, I now put the question to the House for decision. The question is that the motion as just moved be agreed to.

[Motion put for decision; and agreed to]

Tuan Wong ChenPKR · PHSubangEN

Tan Sri Speaker, Standing Order 36(5), "Mentioning the names of other Members", and 36(6), "Imputing improper motives". Tan Sri Speaker, I refer to the speech of my good friend Honourable Langkawi yesterday, in which he read out a WhatsApp message that was not nice for him. He was really hurt, to the point that he used an improper word, namely "sial". Honourable Langkawi read out that WhatsApp message and at the end of his reading he said – I am surprised he wrote photo credit to Honourable Wong Chen. At that time I was not in the House. I watched the video, lah. My good friend Honourable Julau raised Standing Order 36(5) to defend my good name. So Tan Sri Speaker, thank you for allowing me to stand now to give an explanation so that the opposition over there, including Honourable Langkawi, can get the whole truth and nothing but the truth. Many of the opposition over there, we are political opponents, correct. But in Parliament I treat you as my brothers and sisters, with respect. [Applause] So, allow me, with permission.

Mr SpeakerEN

No, no, Honourable Member, no, the Standing Orders do not allow that. If there are any Standing Orders that the Honourable Member is not satisfied with, specify which issue is being raised. But do not tell the background and all that.

Tuan Wong ChenPKR · PHSubang

Okey, baik.

Mr SpeakerEN

Whatever the Honourable Member does not agree with, what is it? Because I was also not present at that time, so I want to hear.

Tuan Wong ChenPKR · PHSubangEN

Thank you, Tan Sri. Tan Sri Speaker, I want to explain. Firstly, I did not write that WhatsApp. That is important. I did not write that WhatsApp. Secondly, that WhatsApp says it used the photo, courtesy of Honourable Wong Chen. Whoever wrote my WhatsApp did not ask me at all. What photo did he use? I don't know either. That means no courtesy was given to whoever used that photo. That is all. I am not asking for a ruling, I just want an explanation so that you do not say I made that WhatsApp; I gave him permission to use that picture. That is important. I also want to advise whoever wrote it, whether a Member of Parliament or outside, that they should look for Honourable Langkawi, talk nicely with him, and apologise immediately. That is all, thank you, Tan Sri Speaker.

Mr SpeakerEN

Alright, thank you.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Tan Sri Speaker.

Mr SpeakerEN

Wait, before that I want to make a ruling, just a moment. That is why I am reminding, and I am also asking, and I will inform my deputies, that any document we cannot verify should not be used in this House, including newspapers. We also do not know whether that thing is an official document, or something fabricated, or something misprinted, so we do not know. In this House we only allow official reference documents. Otherwise, it will be like this. A friend who did not write it, someone posted it, put in fake news, we raise it, I will take action against whoever ─ that is why I am reminding. Secondly, if we want to mention something in Parliament under our Standing Orders, we mention the constituency name. Because we will not mention our friends' names. If we mention the constituency, perhaps we have a very fierce clash, which is really not pleasant. But whatever it is, use the constituency name, do not mention names. That is why it is in the Standing Orders, and it is not nice. Yes, Kuala Terengganu, please.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Tan Sri Speaker, yesterday when I chaired the Parliamentary Special Committee meeting, I raised the speech made by Kota Melaka, which stated that the Parliamentary Special Committee chaired by a representative of the opposition never called a meeting and had the worst performance.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Immediately after the meeting ended, I went in and mentioned this matter to the Speaker, and the Speaker asked me to submit a motion. I submitted that motion to the Tan Sri's Office.

Mr SpeakerEN

Alright, thank you. Give me a little time. I will investigate and I will deal with that. Alright, please, Secretary. Thank you.

Motion — Motion to Postpone Second and Third Readings of Bill under S.O. 62Bill

Dr. Zulkifli bin HasanDeputy Minister in the Prime Minister's Department (Religious Affairs)EN

Mr Speaker, "That, pursuant to Standing Order 62, I move that D.R. 19/2024, the Mufti (Federal Territories) Bill 2024, as stated at No. 4 in today's Order Paper and Motions, be postponed for the second and third readings and brought to a future sitting." Thank you.

Mr SpeakerEN

Alright, thank you. I call the Honourable Minister of Communications to move a motion under Standing Order 62.

Motion — Withdrawal of Bill under S.O. 62Bill

Tuan Ahmad Fahmi bin Mohamed FadzilPKR · PHMinister of Communications · Lembah PantaiEN

Mr Speaker, "That, pursuant to Standing Order 62, I move to withdraw D.R. 47/2024, the Malaysian Communications and Multimedia Commission (Amendment) Bill 2024, as stated at No. 5 in today's Order Paper and Motions."

Mr SpeakerEN

Alright, thank you.

Bill Brought Into the Meeting — Whistleblower Protection (Amendment) Bill 2025 – First ReadingBill

A Bill intituled an Act to amend the Whistleblower Protection Act 2010; introduced into the Sitting by the Minister in the Prime Minister's Department (Law and Institutional Reform) [Dato' Sri Azalina binti Othman Said]; read the first time; to be read the second time at a future sitting.

Bill — Carbon Capture, Utilisation and Storage Bill 2025 Second and Third ReadingsBill

The Order of the Day was read for resuming the debate adjourned on the question, "That this Bill be now read a second time". [5 March 2025]

Mr SpeakerEN

Alright, on the list I have, there are still two people who have not yet spoken. For that, five more minutes are given, and I call Dungun. Please.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Tan Sri Speaker, for the permission to debate the Carbon Capture, Utilisation and Storage Bill 2025. In the original framework when this Bill was tabled, taking into account the United Nations (PBB) Framework Convention on Climate Change, which took effect for Malaysia on 11 October 1994, and also the Paris Agreement made in Paris on 12 December 2015, which took effect in Malaysia on 16 December 2016. The basis of this Paris Agreement is related to reducing the impact of climate change, which is the primary and first foundation, and what was included in the law referred to as CCUS is for a new source of economic growth. Because if we look at our climate basis, we first look at our own resources, at how our respiratory system is something very easily arranged by Allah.

We breathe in oxygen and release carbon dioxide without needing to suddenly find a place where the oxygen we inhale, as the source of life for our breathing, is replaced by Allah with a new source and then released with carbon dioxide. But outside of us, if we look at plants and trees, the trees absorb carbon dioxide and release oxygen. That means to reduce the impact of climate change, we actually need to plant more trees, as has been done.

This is important for us to take into account the original impact of climate change, but today we see how this Bill has been introduced for a new source of economic growth. Basically, we have three matters related to this Bill. (iv) relating to finance or money; (v) technical matters involving structural inflation; and (vi) social impact, namely public acceptance regarding CO2 storage sites in relation to the safety and integrity of CO2 storage sites. Therefore, firstly Mr Speaker, I want to touch on the financial implications. This Bill will involve the government in additional expenditure whose amount cannot yet be determined at this time. Therefore, how does the government plan to finance the financial implications of this Bill? Is it through direct allocation from the annual budget, international loans, or through the Public-Private Partnership (PPP) mechanism? If the government intends to provide incentives or subsidies to companies implementing CCUS, how large a financial burden will the government bear? From which source will these funds be taken? In addition, how will the financial allocation for CCUS affect government investment in other clean energy projects such as solar and wave? Secondly, Tan Sri Speaker, if we look at CCUS, it is a complex combination of processes. Firstly, it is upstream, capture. Secondly, midstream, namely compression for transport through ordinary pipeline or maritime, and finally compression again to be injected at the storage site or utilisation. The need to develop this infrastructure is not only related to finance but also to time, manpower, skills and expertise, and so on. Therefore, I seek an explanation from the Minister: how can we see, in the debate on this CCUS Bill, whether there are already other countries that have implemented CCUS policies and laws to be used as examples related to

regulations and legislation in implementing CCUS? Thank you, Tan Sri Speaker.

Mr SpeakerEN

Alright, thank you. Next, I call Ampang.

Thank you, Tan Sri Speaker. Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Ampang would first like to praise this Bill, which has now been tabled, as I have seen as presented by the Deputy yesterday, after several studies were carried out, comparisons of legislation at the international level were made, and engagement with the existing stakeholders took place. I also want to state here that I congratulate the government for continuing to innovate and be creative in managing revenue and ensuring that current critical issues can be dealt with thoroughly. I believe this Bill is Malaysia's strategic step to accelerate efforts to mitigate climate change, and more importantly, the government's existing commitment to achieve net zero by 2050 as in the Paris Agreement. However, Ampang has several matters on which it seeks an explanation from the Minister. Firstly, in the context of the availability of CCUS technology in Malaysia, is Malaysia truly ready in terms of technology and expert manpower to implement this CCUS? This is because we see that CCUS technology is still at an early stage in Malaysia and is only spearheaded by a few oil and gas companies, such as PETRONAS through the Kasawari CCUS Project in Sarawak. So, we also see that most CCUS technology and expertise are imported, which causes dependence on imports from developed countries and also exposure to, with permission, forex fluctuation and the risk of increased costs. So, I would like to know whether there are further studies showing CCUS's capacity to operate efficiently and safely in the long term in Malaysia. Therefore, I hope there is a plan for developing technology, work, local expertise and technology in the CCUS domain that is detailed, to reduce this dependence. Secondly, Tan Sri Speaker, regarding high costs and implications for the Malaysian economy. I see here that the costs of implementing CCUS are too high, whereas the rate of return has not reached a level that justifies investment in CCUS. So, with this, we see that the cost of developing CCUS infrastructure is estimated at billions of Ringgit and requires large financial support, especially from the government. CCUS projects in other countries, such as the United States and the United Kingdom, have experienced and are still experiencing cost explosions exceeding the original estimates. Therefore, Ampang wants the government's attention: whether the government needs to, or is currently, implementing cost-

benefit analysis where we can see the results of it, I hope there will be a detailed pilot project first before it is implemented on a large scale? This is because we see many concerns from all parties that these matters need to be addressed properly. Next, Tan Sri Speaker, the third point that Ampang wishes to raise concerns the government's injection levy on the operation of this CO2 storage site. How will the injection levy be imposed? How will the proceeds be used? Because we see in clause 30 of this Bill, it introduces an injection levy, which is a charge imposed on companies that store CO2 in a storage site. If we look here, this levy is actually intended to finance long-term regulation and monitoring of the storage site and to avoid a financial burden on the government after operations end. So what we see here is that if the levy is too high, it will in turn deter external investment in CCUS. If it is too low, it may not be sufficient to bear the cost of long-term supervision. So, what approach is the government taking to ensure that this injection levy can balance these two matters? Finally, Tan Sri Speaker, I also see some overlap among the agencies involved in CCUS. So, how will the regulation and monitoring of CCUS be carried out? To what extent is the agency that regulates it independent? We have experience. Sometimes there is overlap between the environment portfolio and among the agencies or ministries that exist. So we request that this matter be looked into so that, in terms of explanation, I have been informed that the Malaysia Carbon Capture, Utilisation and Storage Agency will be established as the main body responsible for these affairs. So, it is understood that other agencies will issue permits to monitor operations and manage the post-closure supervision fund. So, this concern is actually why I seek an explanation from the Minister, so that at the same time it also does not undermine the rights of the Federal and state governments. So finally, I would like to say here that the conclusion is that this Bill must ensure a balance between socio-economic interests, environmental sustainability and the well-being of the people of Malaysia, so that we can ensure Malaysia will continue to be a nation that cares for all these aspects. Thank you, Tan Sri Speaker. Thank you.

Mr SpeakerEN

Alright, thank you Ampang. Ampang is the last debater and now I invite the Minister to respond. Please, Minister.

Dato’ Seri Mohd Rafizi bin RamliPKR · PHMinister of Economy · PandanEN

Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Mr Speaker, thank you. I believe 11 people have debated.

Dato’ Seri Mohd Rafizi bin RamliPKR · PHMinister of Economy · PandanEN

There were specific questions raised by those who debated. But I think it is better that I begin by giving a comprehensive explanation, because this CCUS Bill may be the most technical Bill tabled here, requiring those who have served in the field of engineering to understand what it actually is. The situation is as follows. More and more countries in the world now impose carbon taxes. Some go as high as USD50 per tonne. It will move up to USD80 per tonne.

Dato’ Seri Mohd Rafizi bin RamliPKR · PHMinister of Economy · PandanEN

So, companies across the world that already have carbon tax mechanisms must choose whether to pay the tax of USD50 or USD80 per tonne, or to capture the carbon and then store it. In that way, they do not have to pay the tax. So, this will create a new industry in the world. If there are those who ask, there are those who say that this is for the benefit of companies and will neglect the people. Tan Sri Mr Speaker, every year now we in this country too have to face the effects of climate change. Floods, erratic weather, destruction and so on. Regardless of whether leadership in countries such as the United States withdrew from the Paris Accord, we cannot escape climate change. So, the world will continue moving in that direction, and this is the opportunity we need to look at. Because apart from Malaysia's responsibility to achieve the net-zero carbon target by 2050, we also have several opportunities and challenges that we need to address. First, if we do not have a mechanism to manage our carbon emissions, our companies will be penalised when exporting abroad. Because overseas there are countries with carbon tax mechanisms. If it is not paid or not captured, then that will become a new form of tariff. We will also face difficulty attracting investors, because investors will only invest in industries that have green characteristics. Therefore, many of our industries will face difficulties if they cannot show that they capture carbon. So that is precisely why Malaysia is a very fortunate country, because previously we had oil. Now our oil is running out. So, that oil that is running out, if we use it well, becomes another source of new industry. Because it leaves behind oil fields that are no longer being exploited, and now we can do the reverse process. Previously we extracted gas, now we can inject gas back in. This will become revenue for the government, and this will strengthen the national economy. For the people, it will create job opportunities and economic vibrancy, and also help the country to address the problem of climate change.

Dato’ Seri Mohd Rafizi bin RamliPKR · PHMinister of Economy · PandanEN

I also want to mention one matter that – Kemaman does not have it, but it has been discussed for almost a year with state governments, including the Terengganu State Government, because the greatest benefit goes to the Terengganu State Government. The Terengganu Government now, the only industrial centre in Terengganu is in Kerteh. The only industry that provides good job opportunities is the oil and petrochemical industry in Kerteh. That industry now has a time limit, because offshore of the Terengganu coast, the oil and gas has already declined and at some point will run out. So, to the Members of Parliament from Pantai Timur and especially from Terengganu, I urge us to think. If in 15 years, and I, Mr Speaker, my origins are from there. I am a Kemaman person, from Kerteh. I know that if there is no oil industry in Kerteh, then Kemaman will die and the effects will be felt across the whole state of Terengganu. So, as elected representatives, Dungun and Setiu here. What is the state government's plan to ensure that when the oil is gone, there is no such huge impact on Terengganu? That is why the Terengganu State Government is the strongest supporter of this CCUS Bill. Because with CCUS, we can extend Kerteh's potential as an industrial centre. In the past, industry in Kerteh depended on oil we extracted from offshore. Now we can use the CCUS facilities that exist offshore of Kerteh and also in Kuantan, for example. With this CCUS hub, this allows us to bring heavy industries there, because heavy industries need to capture carbon and store it offshore. This is for the future of Terengganu State and Pahang State, and that is why Kemaman does not have – actually Kemaman has promised me that the representatives from Perikatan Nasional will fully support this CCUS Bill. Because the earliest project, if approved, will be in Terengganu and then perhaps in Kuantan. So, if the representatives here today behave like they did during the Constitutional amendment, and do not support it, the victim will be the state of Terengganu itself, because we cannot proceed with the project as early as we intend to announce as early as 2025. Alright, Mr Speaker, I will continue directly with the time available, responding to several matters raised by Members of Parliament. Before I answer whether it is safe or not, the technology, who will pay and so on, we must understand the economic method to ensure how the CCUS industry will function. The government is not spending any money at all. So, who pays for this CCUS? That is why I mentioned that, when there are countries across the world and in this region, the closest to us is ASEAN –

Dato’ Seri Mohd Rafizi bin RamliPKR · PHMinister of Economy · PandanEN

is Singapore. Singapore already has a carbon tax, and in Malaysia itself, the Most Honourable Member for Tambun has also announced that we will begin considering a carbon tax for heavy industries such as steel in the very near future. Once there is a carbon tax, there will be people or companies that will pay to store this carbon. If the carbon tax is 50 dollars per tonne, then the choice is either to pay the carbon tax or to pay 50 dollars to someone or something that can capture that carbon. So that is why, suddenly, it becomes a good business opportunity, and investors will pay to build the entire CCUS infrastructure. It is roughly similar to how it works in the gas industry, how an LNG complex is developed, Mr Speaker. What I mean is that once we have a site, before the investment can be developed, long-term contracts with buyers must be concluded first. Prices are fixed for a period of 15 or 20 years based on these contracts. So, the money is already there, so that investors can then invest money, develop, and begin operating, and the government in fact has no direct investment. The situation is the same. For example, Entity A wants to develop a CCUS complex offshore of Kerteh. They will sign an agreement with Company B from country C, Company D from country F, for a period of 15 to 20 years at a certain price under that contract. Then they will invest and they will be paid. The government will take proceeds from several permits and levies, but all of it will be borne by the companies mentioned earlier. So, with that background, it enables me to answer several specific questions that were raised.

Let me answer first, Dungun. There are some questions that were raised – Tangga Batu, I believe almost all of the opposition raised the question of whether it is safe or not safe. I see that almost all of them referred to one and the same Google search, namely the gas leak at Lake Nyos in Cameroon.

We must go back to the basics of our chemistry knowledge. In fact, carbon dioxide is not classified as a toxic chemical. Under the Environmental Quality Act 1974, CO2 is not specifically controlled, because CO2 is a natural gas just like oxygen, just like nitrogen. If you look at all the regulations, none includes CO2 as, with permission, scheduled waste, because it is indeed not a prohibited chemical, yes. Based on the Intergovernmental Panel on Climate Change report, we all know that storage of CO2 in geological formations has been confirmed as safe, with a probability of leakage of less than 0.001 per cent. What some Members of this House mentioned about Lake Nyos is a natural disaster, where underground movement near a mountain, near a volcano, produces gas pressure that causes the gas to burst out. That is not the same as the application when we build CCUS. I want to give this perspective to those who refer to just one Google search to bring to Parliament.

If we are going by the petrochemical industry that we have, all the petrochemical materials we have, whether at Pengerang, whether at Kerteh, whether at Gebeng, whether at Gurun, all of these that exist across the whole of Malaysia, right, including the gas imports, whether at Pengerang or at Sungai Udang – that does not yet include Sabah and Sarawak, all of these are chemical elements that are far more dangerous than CO2. So, if we take the approach where we take one Google search, "This explodes, then we are finished", we would shut down everything that exists. Why do we not object, but instead want big oil and gas projects in our area, yet when it comes to CO2, which is in fact not dangerous at all compared with other hydrocarbons, we object? Whether it is because we lack knowledge, or because we simply want to object without using our reason. If CO2 is not allowed, then all the others would not be allowed either. Why can we operate that industry well? Because we have regulations, we have technology, we have laws, we have expertise, we have regulation. That is also what is needed through this CCUS Bill so that...

[Bangun]

...Although chemically this CO2 is not considered dangerous, we still take the risks into account, which is why there must be laws, there must be regulations, there must be expertise. When this is done well, God willing, it will become safer compared with all the industries that exist now. Tumpat, I want to answer first. If there is time, then I can answer again.

I want to refer to the same matter.

Mr Speaker

Yang Berhormat.

No need. Let me answer first. Give the opportunity, Tumpat. Don't, when the Minister answers, feel hit and immediately want to reply again. Let the Minister answer everything.

No. I want clarification. Not to reply again. I want clarification.

Next, many have raised this matter as being rushed. "Why rush it?" Machang even said this affects the people and is rushed. I would advise that next time, when the ministry holds engagement sessions with Members of Parliament, please do attend. We have tabled it to the Special Committee on Finance. Tabled. We tabled it to the Special Committee on Environment, chaired by the opposition itself. Tabled. We held engagement sessions (SLU) with Members of Parliament. We even provided food.

But many did not attend. We have held engagement sessions with the states. We have held engagement sessions with NGOs. Why is it said to be rushed? In fact, the government's policy on CCUS began as early as 2013. A decision was indeed made that Malaysia needs CCUS, taking into account compliance with carbon capture and storage as early as 2013. But it did not happen. Thirty-three months under another government, and it still did not happen. So, when it reached the current government's stage, when we see opportunities, especially countries such as Singapore, Japan and South Korea, which already have carbon taxes and need places to store carbon, with this CCUS, it can give a new breath of economic life to states whose economies are rather underdeveloped, such as Terengganu. So, we cannot wait any longer. If there are those who say why it must be expedited, that is the view of some NGOs which we have taken into account, but that view is based on the reasoning that CCUS cannot be done at all. It cannot exist in Malaysia at all. So, even if we continued discussing, Tan Sri Mr Speaker, it would not reach any point of agreement, because the difference of opinion is very large. But if in terms of being rushed to the point of being incomplete, we have taken a long enough time and presented it to everyone. This is necessary so that we can enter into agreements for the project in Terengganu State as well. When we table and announce it again, I hope they will not take the name. Because I want to record how much effort we went through to reach this point for the state of Terengganu. It was opposed during the debate too. Next, the question of liability.

The Honourable Minister. The Honourable Minister.

I was asked – let me answer first.

Mr SpeakerEN

Dungun, one moment, please.

Let me answer first, because I have two minutes left.

If you want to answer, answer. After you answer, you don't even allow it.

Unless the Tan Sri gives time after that for them to interject, YB, yes.

Mr SpeakerEN

Okay, this is our deal. The Minister finishes first. God willing, I will give it. God willing.

Next, the question of liability. That is why I feel I need to explain first, Tan Sri, how this industry will function. Many Members who debated asked who bears the responsibility if there is a loss, if there is a leak, and so on.

This Bill will be read together with all existing laws. These existing laws are subject to all existing regulations and Acts. That includes those that regulate all matters of breach of law, matters of liability, matters of criminal liability and so on. It is the same if we build a factory behind our house. If anything happens, there will be consequences in terms of criminal liability and financial liability that must be paid. The concept is the same as now, when oil companies operate an oil platform offshore. Liability in terms of criminal and other matters is subject to existing laws. What is different with CCUS is that the contract for a site is for a specific period ― 20 years, 30 years. After the 20 or 30 years are over, it will be returned to the government. Or the government may decide to renew it, but there is a provision for it to be returned to the government. The question is, when it is returned to the government, who will bear the liability if there is any? That is why we have the Post-Closure Trust Fund. That is why for every tonne injected, a levy must be paid to the government. That is why this Bill needs a trust fund that is kept forever as insurance, so that if after it is returned to the government something happens and the government needs to spend money, it will be paid from that trust fund. If I may have another two or three minutes. There are two or three more points.

Mr Speaker

Silakan.

Revenue to the states and state powers, yes. It is different from the oil industry. In the oil industry, we take minerals from the ground and then sell them. So, that becomes a natural resource. This is actually the reverse. This is in fact a hole in the ground. There is no revenue. It actually becomes a storage facility. And as for rent, for companies, they only collect rent. Therefore, revenue to the state government is, if on land, for us to build a terminal and build processing, this will create a new industrial area whose taxes will be collected as usual.

[Dato' Indera Mohd Shahar bin Abdullah (Paya Besar) presided over the Sitting] To the Federal Government, the revenue is only if the company makes a profit; it pays income tax as usual. If it makes no profit, there is no revenue at all. But, most importantly, with this new industry, it will enable the creation of up to 200,000 jobs by 2050. For me, this is more important than the collection of tax by the state government or the Federal Government, especially for places such as Kerteh and Kuantan which

need CCUS as a new engine of economic growth, because the existing hydrocarbon-based industry will die when gas and oil run out. I have actually answered the question on why we need to import carbon. We need to import carbon because they pay us to develop these storage sites. Our economy has not yet reached the level where they can pay for themselves. Our responsibility under this law is to ensure that it is developed safely, and that all regulations and also regulatory control will ensure that it can be carried out professionally and without any risk to the people. Other questions, including on costs borne, I have already answered. In fact, no costs are borne by the government. And lastly, before I give way to them, Mr Speaker, a few more questions. They have asked repeatedly about the expertise of our people to carry this out. In fact, if we can operate oil platforms well, the expertise to operate an oil platform is higher than the expertise to operate a carbon storage site. The process is a reverse process. In fact, taking things out is more difficult than injecting them back. So, I think we have no problem having a trained workforce to carry out this matter. That is why I ask that, if it can be passed quickly and with everyone agreeing to pass it, because this will enable Malaysia to become a global leader in CCUS. This is because indeed only Norway is currently successfully implementing it well. It is not that other countries cannot do it, but other countries do not have the characteristics that we have. There are oil fields that are no longer in use, there is a good workforce, and there are customers who want to pay. So, this is very important for the economy of the East Coast for the next 30 years. So, that is why, Mr Speaker, many of my friends are also from the East Coast. In order to close the gap between the West Coast and the East Coast, I ask that the House pass the CCUS Bill unanimously today, unless there are interventions.

Any interventions? Honourable Minister, I will give five minutes if there are questions. Please.

Thank you, Mr Speaker. I would like to ask the Minister because in the 2023, 2024 and 2025 Budgets, tax exemption, allowances and duty exemption have been given to companies venturing into this carbon capture. So, so far, how many companies have taken up the tax exemption and also the tax allowances and duty exemption? Second, if possible, please explain the carbon capture plant project by PETRONAS in Bintulu, that is in Sarawak

in Block SK316, which is said to be in phase one and after that there will be a phase two? Thank you.

Okay, thank you Mr Speaker, thank you Honourable Minister. I am not referring to the case at Tasik Nyos. But, when the Honourable Minister answers, I would like to ask for further explanation. Because even naturally, carbon dioxide is heavier than ordinary air, which is why in the Niosh case it flowed down the hill. So, in our case in Malaysia, when we capture it and put it back into our earth, what steps will we take if naturally it can cause death? In our action, we may store more than what was in Niosh, what can we do? Because I think we need people's knowledge about preparedness if there is any leakage from our storage sites. That is the first. Second, I would like to mention to Dato' Speaker and also to all the government.

[Bangun]

When it comes to engagement sessions, I am very disappointed. One, we are interested in engagement sessions, I attend almost all engagement sessions. But sometimes we cannot attend because engagement sessions are held at meal times and prayer times. In the engagement session, the camera – not the camera, the screen is at the front. So, if we are at the back, we have to turn around. When briefings are held, engagement sessions are held, matters as important as CCUS, as important as URA, while eating, while asking questions. I think it is time for us to achieve one – we have just finished the Parliamentary Services Act (PSA). Can we have a wider time slot for any engagement sessions, especially for big cases such as CCUS, URA and so on, to be given a proper space, not only held while eating? I understand, it is difficult to gather Members of Parliament. But, Members of Parliament also need to pray, need to eat, and facilities are not many, and in terms of time too it is limited, at 2.30 in the afternoon we already have to stop. So, possibly in future such engagement sessions will be held at a more proper time, because we want to discuss policy issues and national issues. Thank you.

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Mr Speaker, one more? May I?

Datuk Ahmad Amzad bin Mohamed @ HashimPAS · PNKuala TerengganuEN

Okay, okay, okay. I would like to ask, if we pass this today, the timeline in terms of implementation, what is in the ministry's plans? Do we already have existing potential that intends to send this carbon to our country? Thank you.

Mr Speaker, I will try to answer quickly. To Dungun, two questions. The first question, indeed the government in the previous budgets has provided fiscal incentives, including from investment allowances and so on. I do not have an answer from the Ministry of Finance, but as far as I know, indeed not a single company has been involved. How can they be involved, when there is no law yet? When there is no law, then although there have been incentives since 2023, this industry cannot begin. That is why, if people ask why it is being rushed, that is the reason. We should have done this long ago, but this law did not exist. So, that is why the Ministry of Economy has taken responsibility, and within a short period of less than one year we have to finish it. After this, Dungun, I hope that once this law exists, companies can begin to participate and take up the existing fiscal incentives. The second question, Dungun, I would like to refer to Kasawari in Sarawak. It is underway, although the concept is somewhat different. What is being carried out in Sarawak for carbon capture is rather different because their gas fields have high carbon content. So, they need to remove the carbon content in the field before the gas can be cleaned. So, to my knowledge, the Kasawari project currently underway is not for storing imported carbon but for removing carbon content from existing gas fields. The Tumpat question on safety and Tasik Nyos just now, based on the information and experience we have now, we have two best references. One, the CCUS storage site in Norway has been operating for more than 20 years and has permanently stored more than 20 million tonnes of CO2. With everything that is available, the advantage is that when we can develop scientifically, we can take into account the risks intended to ensure it is safe. Another good piece of evidence is the storage site in Tomakomai in Japan, which was not affected even when struck by an earthquake of magnitude 6.7 on the Richter scale. So, so far, those are the figures we have. Of course, it depends on engineering design. That engineering design.

The Tumpat question and views on SLU, I hope these can be considered at the level of the Parliamentary Council, in fact. Because we in the ministry only follow what has been set by Parliament. We cannot interfere during Parliamentary business, and the time given to us for engagement sessions is only the afternoon, that is all we have. Unless Members of Parliament say they want to hold it at night, then we will come at night. But that must be set by Parliament and notified, and we will adapt it appropriately, yes. The Kuala Terengganu question, going by the timeline, I hope it is passed today as quickly as possible so that I can enforce this law by 31 March

2025. Why 31 March 2025? Because international tenders to store this carbon are happening now. If Malaysia does not enforce this law by 31 March 2025, we will be left out, we cannot enter the bidding. When we cannot enter the bidding, let us say Indonesia wins, because we are competing with other countries, with Indonesia. If Indonesia wins, once it signs the contract, it signs a contract for 30, 40 years. So, if we take Kerteh as an example, if we miss out, Kerteh is lost. So, if the oil is gone and the gas is gone, then do not come and ask me again in 10 years what we are going to do with Kerteh. That is why the timeline is like that, because indeed we already have several potential customers who will send carbon to Kerteh and also to Kuantan in the near future, that is why it needs to be passed and enforced by 31 March 2025. Thank you, Mr Speaker.

Thank you, Honourable Minister of Economy. Honourable Members, I now put the question to the House for decision. The question is that this Bill be read a second time now. [Question put, and agreed to] [Bill read a second time and committed to the House as a Committee] [The House resolved into Committee] [Dato' Indera Mohd Shahar bin Abdullah (Paya Besar) presided over the Committee] [Clauses put to the Committee] [Clauses 1 to 53 ordered to stand part of the Bill] [The Bill reported to the House now] [The House resumed] [Bill reported without amendment, read a third time, supported by the Deputy Minister of Economy (Dato Hajjah Hanifah Hajar Taib) and passed]

Bill — Government Service Efficiency Commitment Bill 2025 Second and Third ReadingsBill

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

Mr Speaker, I seek permission to table the Bill entitled the Government Service Efficiency Integrity Bill 2025, hereinafter referred to as the Integrity Bill. Thank you, Mr Speaker. For the information of Mr Speaker and this august House, the Integrity Bill is drafted with the aim of improving the quality, efficiency and effectiveness of government services by tackling bureaucracy, reducing regulatory burden and implementing performance rating of services. The Integrity Bill also addresses bureaucratic problems and eliminates unnecessary or outdated regulations, guidelines and administrative directives to improve the efficiency of government governance. In line with the implementation of the Public Service Salary System (SSPA) which came into force on 1 December 2024, the Integrity Bill manifests the commitment to enhancing efficiency in government services to the people and the business community. To realise the government's intention, the government has designed the Integrity work in two forms of reform. The first reform is structural reform to reduce bureaucratic red tape and regulatory burden, or hereinafter referred to as regulatory burden on the people and the business community. Next, the second reform is process revolution to facilitate matters for the people and the business community through improvement of government services and uniformity of delivery. Both these reforms are the mission of the Integrity framework. The core of the Integrity framework for structural reform is by drafting an Integrity Act to regulate the efficiency of government services to the people and the business community. Meanwhile, the process revolution is based on the principle of smart governance, which aims to facilitate the transition towards Smart service delivery. Through this core, it is the government's aspiration to make a major shift under structural reform by mandating review of regulatory instruments and reducing regulatory burden by 25 per cent within three years. Finally, introducing government regulatory rating based on the performance of implementing structural reform and smart governance as a merit in the granting of allocations and also incentives. The major shift for process revolution is implementing a one in one out approach, or with permission, one in one out, on existing regulations, empowering government services starting with the Government as a Platform (GaaP) model

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

and one door policy. Accepting the whole-of-nation approach through co-creation involving the people and the business community, and making the integrity commitment one of the key performance indicators of ministries, departments and also agencies. Mr Speaker, in line with the wish of the Right Honourable Prime Minister to implement reform in the efficiency of government services, the government is of the view that the implementation of the Integrity Bill can resolve the main problems faced by the people, including those related to daily affairs, business, and access to government services. For the information of Members of the meeting, the drafting of the Integrity Bill is made under Article 74 of the Federal Constitution read together with Item 6(c)(g) of List I, Federal List, Ninth Schedule of the Federal Constitution. Mr Speaker, with this I will briefly explain the Integrity Bill, which consists of 14 clauses as follows. Clause 1 contains the short title and also the provision on the commencement of the proposed Act. Clause 2 makes provision for the application of the proposed Act to the Federal Government and Federal Government entities. For the purposes of the Integrity Bill, government entity means: (a) any ministry, department, office, authority or agency of the government or any other entity in government service. Secondly, any statutory body established under an Act of Parliament or thirdly, local authority for the Federal Territories of Kuala Lumpur, Labuan and also Putrajaya.

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

Meanwhile, as regards the meaning of "kerajaan" (government), reference is made to the Interpretation Acts 1948 and 1967 (Act 388), which state that kerajaan means the Government of Malaysia. Clause 3 provides that the proposed Act shall be read together with the related written laws, and that the provisions of the proposed Act shall be in addition to, and shall not diminish, the provisions of those related written laws. Clause 4 contains definitions of certain words and expressions used in the proposed Act. Clause 5 aims to make provision for the principle of iltizam. The principle of iltizam emphasises the responsibility to improve service performance with efficiency and effectiveness, encourage an ethical work culture that practises the values of integrity, accountability and transparency, implement structural reform on an ongoing basis, and reduce the regulatory burden.

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

Clause 6 aims to impose a responsibility on government entities to carry out a review of procedures under their regulatory instruments and to reduce the regulatory burden by at least 25 per cent every three years. This clause also makes provision for the one in, one out policy, "dengan izin" (with permission), one in, one out, which requires at least one regulatory instrument currently in force to be revoked before a new regulatory instrument is enforced. Clause 7 aims to make provision for the establishment of a performance rating to measure assessment – to measure, evaluate and monitor the effectiveness and efficiency of the service delivery of government entities. Clause 8 aims to make provision for the duties and powers of the Chief Secretary to the Government (KSN) under the proposed Act, which include planning, implementing and monitoring policies relating to the principle of iltizam. Clause 9 aims to make provision for the duties of the head of a government entity under the proposed Act, which include ensuring that the management and services of government entities under their supervision are in line with the principle of iltizam, and preparing and submitting service performance reports periodically to the Chief Secretary to the Government. Clause 10 aims to make provision for the submission of service performance reports by the head of a government entity and the rating of the government entity based on those reports. This clause also gives the Minister the power to appoint a person with suitable qualifications to submit findings on the service performance of government entities. Government entities that achieve a certain rating level are eligible to receive incentives and recognition from the Federal Government. Mr Speaker, this august House has been informed – was informed earlier – regarding federal powers under Article 74 of the Federal Constitution. The Federal Government takes note of the separation of powers between the Federal Government, state governments and local governments. In this regard, clause 11 aims to provide that state government entities may voluntarily submit service performance reports to the Chief Secretary to the Government for the purpose of rating, in line with the separation of powers under the principle of federalism. Clause 12 aims to make provision for the preparation of the Government Service Efficiency Iltizam Report by the Chief Secretary to the Government, which must be prepared every three years. The Iltizam Report shall be tabled by the Minister responsible in the Dewan Rakyat as soon as it can be carried out. Clause 13 aims to make provision for exemptions to facilitate the implementation of the reduction of the regulatory burden. This clause states that the Minister responsible may, after consultation with the Chief Secretary to the Government, by an order published in the Gazette, exempt:

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

(i) any government entity or any part of any government entity; or (ii) any regulatory instrument or any part of a regulatory instrument. From all or any of the provisions, this Act is subject to any conditions as may be specified by the Minister in the order. This clause also provides that the Minister may revoke an exemption order with specific conditions. Clause 14 aims to give the Chief Secretary to the Government the power to issue directives, circulars and guidelines to implement the provisions of the proposed Act. For the information of Members of the House, the government is currently finalising the guidelines required for the implementation of this Act. The government will also issue any relevant directives or circulars in the future. Mr Speaker, I hereby beg to move.

Is there anyone who supports?

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

Mr Speaker, I beg to second.

Honourable Members, the question before the House is that a Bill entitled an Act to enhance the quality, efficiency and effectiveness of government services by tackling bureaucracy, reducing the regulatory burden and implementing service performance rating, and to make provision for matters connected therewith, be read a second time now and is open for debate. Honourable Members, there are 11 speakers on the list for the Iltizam Bill. The first speaker is the Honourable Member for Petaling Jaya, the Honourable Member for Indera Mahkota, the Honourable Member for Betong, the Honourable Member for Pengkalan Chepa, the Honourable Member for Kota Belud, the Honourable Member for Besut, the Honourable Member for Bukit Bendera, the Honourable Member for Padang Rengas, the Honourable Member for Putrajaya, the Honourable Member for Rasah and, finally, the Honourable Member for Pasir Mas. Please, the Honourable Member for Petaling Jaya. 5 minutes.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you, Mr Speaker. Green paddy fields turning yellow, The harvest gathered at dusk, Smooth bureaucracy, assured dealings, The nation's prosperity continually preserved. In general, this Bill intends to improve the performance of the public service in Malaysia. The Iltizam Principle is introduced under clause 5 of this Bill, where emphasis is given to efficiency, governance responsibility, structural reform and

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

effectiveness of regulatory oversight. Ethics and values such as integrity, accountability and transparency are emphasised to ensure the quality of a public service that is efficient, effective and oriented towards the interests of the people. This assurance is in fact a responsibility of the government as the guardian of the people of Malaysia. For 12 years, Mr Speaker, government employees have faced real wage stagnation, which is the situation where workers receive no salary increase while inflation continues to occur. The MADANI Government raised civil servants' salaries last year to increase the purchasing power of civil servants in response to the rise in general prices. This is also a stepping stone to a low rate of corruption and higher motivation to increase the productivity and efficiency of public workers in our country. As stated by Prime Minister Tambun at the Monthly Assembly with Staff of the Prime Minister's Department last December, the increase in civil servants' salaries carries the aspiration of the government and the people of Malaysia to see an improvement in service performance. Now, the Bill has been tabled in a very short time, and I extend my congratulations to the MADANI Government for making the improvement of government performance and efficiency our priority for the people. This Bill is tabled as the government's effort to help realise an aspiration which will ultimately benefit not only the government administration and the national economy but, most importantly, the ordinary people who need public services. Mr Speaker, here I see a two-pronged approach. Firstly, if the delivery of these services is further enhanced to become more efficient and more effective, it will help the affairs of our ordinary people. We see whether the UTC initiative or other matters have increasingly been made online or in the form of a single window or one counter. So, I am confident that this approach will further enhance our delivery and our services to the people and bring the government closer to – in the eyes of the people. Imagine in the past, if we wanted to make a passport it took days. But now, in my experience in renewing my passport, I found that I could send a recent photo. Take a photo of oneself, send it online and then collect the new passport.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

So, this is an improvement, and I feel we cannot be complacent with the performance we have now. On the contrary, we must always be on guard to continue improving further. The second function for me is how we can facilitate domestic investment as well as international investment. We always hear that bureaucratic red tape may be due to noble motives or principles.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Some say we need checks and balances, we need time to review and evaluate. All of that is true, but at the same time, it is appropriate for us always to examine and re-check whether bureaucracy has become what this Bill calls a regulatory burden, with permission. This Bill states very clearly that bureaucratic red tape or the regulatory burden must be reviewed every three years, and everyone must ensure that the regulatory burden is reduced by at least 25 per cent. So, this is a very timely quantification, very precise in its timing, and I therefore fully support the Government Service Efficiency Iltizam Bill and congratulate the Cabinet and the Minister responsible for managing to table this important Bill. That is all, thank you.

Thank you, Honourable Member for Petaling Jaya. Please, the Honourable Member for Indera Mahkota.

Dato’ Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Thank you, Mr Speaker. I would like to begin by inviting Honourable Members to take this opportunity to express my utmost thanks to all members of the government, whether in ministries, departments, offices, local authorities or statutory bodies, who have served the people and the nation of Malaysia so excellently all this time. [Applause] I would like to congratulate the Honourable Minister and all parties who initiated and drafted the Bill, which I consider to be very good. Since there is no preamble or introduction, although the Minister's speech earlier was quite comprehensive, allow me a minute or two to mention some history of the public service. First, the service of the Government of Malaysia, our public service, was at one time considered among the best in this region. I regard our efforts today as part of a method to restore that excellence and to facilitate its improvement from now on. Second, all this time the government, especially government service officers, have carried out a series of transformations and developments using various ideas and models of public service reform. From bureaucratic model to new public management to governance to joined-up governance to public value to the Government Transformation Programme, and today we hear that two models are being used, which I managed to catch are government as a platform. This is among the latest thinking and styles of government administration, beginning with an idea initiated in 2011 by, if I am not mistaken, Tim O'Reilly, and subsequently widely used in the UK, in Estonia and so on. I hope

Dato’ Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

the Honourable Minister, apart from this Bill, has other ways in which he is intensively involved with other initiatives by the government, especially to uphold integrity, eradicate corruption and so on. I would also like to inform the House that the idea of having a new framework for public policy or new ways of governing has also arisen before this. Earlier I mentioned the transformation that took place among administrators and government officers. On the Cabinet side, I would like to state that during the 7th Prime Minister's and the 8th Prime Minister's terms, as it happens Pagoh is in the House today, a Minister was entrusted to discuss with the KSN at that time and the Director-General of the Public Service (KPPA) at that time. It involved three KSNs and three KPPAs to find a way to improve or reform the public service, but there was not enough time to do so because the original intention was to table a white paper in this august House on the whole matter. So, I would like to propose to the Honourable Minister responsible for public service that, today we pass this, God willing. But if possible, later make a ministerial statement; there is no need to go as far as a white paper because this is just one part of the public service. But the public service as a whole, if possible, should be brought to this House, because whatever good things the government officers wish to do have constraints, Mr Speaker. Their constraints are, first, political interference, or second, political people do not understand administrative work, Ministers do not understand the work of the KSN, KSU and so on. Alright, I want to touch on a few brief points in this Bill because time does not permit. The first is Article 5, the Iltizam principle. I hope it will also involve the wider development framework in which cooperation between the government is clarified, because we always have three sectors: government and politics, business and civil society. I hope this can be refined or clarified. Although it may happen online in a digital system, the philosophy must be carried through. Likewise with efficiency mentioned as 5A, service efficiency. I hope it includes the matter of subject matter experts. I have already touched on this in this House in my previous speech, and also on the matter of accountability, integrity and so on. Finally, Mr Speaker, the seventh point.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Indera Mahkota, before the last one. Can I? Just a little.

Dato’ Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

There is no time, Hulu Terengganu.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Just a little, just a little. Relating to the fact that we already have the Public Service General Orders. Is it necessary to add further to them with this iltizam? Thank you.

Dato’ Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Yes, thank you. I think this is a continuation of what I mentioned earlier. Earlier I mentioned the relationship between this Bill and the initiative to eradicate corruption and integrity, but what Hulu Terengganu raised is more focused on the General Orders and so on. What I want to mention is the matter of service performance rating. I would like to propose that it be not only a rating at our level, local, but also compared with ratings at the international level. For example, what is the relationship with our work with the SDG, the Sustainable Development Goals, or if using the OECD model there is also Open Government for Stronger Democracies, or before the initiative in the UK that now is called government as a platform, they still also use, for example, the Open Government Partnership. So, the meaning is that we are not only the best in the country but also on par with, and if possible better than, what happens elsewhere. Thank you, I support.

Thank you, Honourable Member for Indera Mahkota. Please, the Honourable Member for Betong.

Thank you, Honourable Mr Speaker, for the opportunity to debate the Government Service Efficiency Iltizam Bill 2025. Mr Speaker, the people have indeed been facing bureaucratic red tape that burdens them for far too long, as well as systems that are so slow that it is easier to ask for help from middlemen than to deal directly with the government. So today, we want an explanation to the people on how the government intends to ensure that this Bill will truly change the way the public service works. Mr Speaker, the process of obtaining government assistance is so complicated that people would rather not apply at all. Complaints from the public are often left unattended and government officers merely take note without any solution.

My question is, with all the existing rules, KPIs and systems, why are there still many weaknesses in the delivery of government services? Is there an enforcement mechanism to ensure that government agencies truly act on this reform, or is it merely an empty slogan? This Bill also- stipulates that the regulatory burden must be reduced by at least 25 per cent every three years. This is a big promise and my question is, who will ensure that every ministry complies with this requirement? If any ministry fails to reduce the regulatory burden, what action will be taken against them? The people also do not want the excuse that this is just a target without any

...consequences if it is not met. If the Government is serious about reform, there must be firm action against ministries that fail to change. Mr Speaker, this Bill introduces a performance rating system for government services. That is good, but I am worried it will be just a report on paper that has no impact on the people. For example, in the UK and Singapore, citizens can give direct assessments of government services, and this data is used to make immediate changes. My question: will this rating be done openly, accessible to the people, and not merely a confidential government document? Another question: will this system be used as the basis for determining allocations to ministries and agencies with high performance and, conversely, for reducing the budget of those that fail? If the Government is truly serious, failing agencies must also face action, not merely be given advice or friendly reminders. The people no longer want to queue at government counters for matters that can be resolved online. As an example, Estonia and Singapore have proven that nearly 99 per cent of government services can be accessed digitally without citizens having to queue for long periods. My question: what steps will the Government take to ensure that the one in, one out principle for new regulations is truly implemented, to avoid unnecessary additional rules and to avoid imposing regulatory burdens on the people and the business sector? In this regard, I want the Minister to state clearly: what is the Government's target to ensure at least 80 per cent of government services can be done digitally by 2030? Is the Government willing to make bold decisions, such as completely abolishing physical forms in most government transactions? The people do not want to hear answers like "we are in the process" or "we will study it." The Government should announce what the action plan is and when it will be implemented. Mr Speaker, in this one minute I want to propose several steps that can be considered for this purpose. First, an annual reform report. Every ministry must present its reform achievements to Parliament. Second, penalties for failing agencies: cut the budget of ministries that fail to achieve the set efficiency level. Third, public involvement in service evaluation. Establish an online system where the people can give direct feedback on any government agency. And fourth, full digitalisation of government transactions. Abolish physical forms in most transactions, except for matters that truly require physical presence. If we do not carry out reform with firmness, this Bill will become yet another empty promise swallowed by time. How will the performance rating of government services under this Act be carried out transparently and objectively, and whether the report

of this performance will be made available to the public for the people's reference in order to improve accountability in the administration of the country. Mr Speaker, the people do not care how many laws we pass if they still face a sluggish, bureaucratic and unfriendly government system. Therefore, this Bill will only be meaningful if the Government dares to truly implement it and does not merely make it yet another policy that is ignored. Thus, I support this Bill, but I want a firm answer from the Minister. Not a safe answer, nor sweet promises, but a clear action plan. Thank you.

Thank you, Honourable Betong. Please, Honourable Pengkalan Chepa.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Thank you, Mr Speaker, for giving me the opportunity to debate the Government Service Efficiency Commitment Bill 2025. I actually have no problem supporting this Bill. But looking at recent developments, many methods, many laws and many regulations that are already good in our country exist, but the people who implement them have problems. Imagine selective prosecution occurring in our country. People with dozens of charges can have their prosecution withdrawn at the last minute, let alone such small matters. What worries us is that it is a long list of new rhetoric added to the Government we have today. Although on paper it looks good, I very much agree with the tone of Betong earlier. However, I am puzzled: he has opposed a lot but in the end, he supports it. While we are talking about this Iltizam Bill, the people outside, Mr Speaker, are facing a pile of regulations that shackle traders and ordinary citizens too. Sluggish government services that are not aligned with agencies. Imagine, lunch break becomes a burden. When people come, the counter is already closed. When they come, those who want to transact at government counters have to take leave, and one day is not necessarily enough to finish. Those who lose their passports, how lengthy the bureaucracy is, Mr Speaker. These are among the grievances of the people. Not to mention we see on social media how tensions arise at government service counters. Then, there is a monitoring system that is vague and not transparent. This is what is being discussed today. I would like to mention several points, among what may be described as weaknesses of this Bill. First, I want to state that there is no strict monitoring and accountability mechanism. This Bill gives great power to the Chief Secretary to the Government (KSN) to oversee the performance of the public service. However, who will monitor the KSN? Who will monitor the KSN? Is it enough just to have the Prime Minister? When we understand, when it is monitored by a Prime Minister, all sorts of things can happen in terms of appointments, promotions for service and so on. We should have an independent monitor, as done by the Singapore Government. They have the Public Service Commission (PSC), which is independent of the government, to evaluate the performance of the public sector transparently. Second, there are no details on laws and firm action against failing agencies, Mr Speaker. It merely states that performance reports will be reviewed and ratings will be given, but there is no clear action against ministries or agencies that fail to achieve efficiency standards. We do not want yet another burden on this country where the people will keep saying the same things. Take the Auditor General's Report, for example. We hear of various leakages and weaknesses, but no drastic action is taken. The people want to see reform that is truly effective, not merely reports that are fine-looking, thick, with a large printing cost. Third, what I want to mention to the Honourable Minister is the 25 per cent reduction in regulatory burden. Whether this is a gimmick or reality, to appear more progressive. I am not sure about that, but as an opposition member, I have to speak in this tone, even during the fasting month. This Bill sets a 25 per cent regulatory burden within three years, but how will that 25 per cent be determined? Has the Government conducted an empirical study that proves 25 per cent is a realistic figure, or is it merely to show that it looks like a lot, 25 per cent? That is my question.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

want to monitor the Chief Secretary to the Government (KSN)? Who wants to monitor the KSN? Is it enough to leave it to the Prime Minister alone? When we understand that- when it is monitored by a Prime Minister, all kinds of things can happen in terms of appointments, promotions for service and so on. We should have an independent monitor, as the Singapore Government has done. They have a Public Service Commission (PSC) that is independent of the government to assess the performance of the public sector transparently. Secondly, there are no details on laws and firm action against agencies that fail, Mr Speaker. It merely states that performance reports will be reviewed and ratings will be given, but there is no clear action against ministries or agencies that fail to achieve efficiency standards. We do not want yet another burden on this country where the people keep saying the same things. Take the Auditor General's Report, for example. We hear of various leakages and weaknesses, but no drastic action is taken. The people want to see reforms that are truly effective, not merely reports that look impressive, are thick, and cost a great deal to print. Thirdly, what I want to mention to the Honourable Minister is the 25 percent reduction in regulatory burden. Whether this is a gimmick or reality, to appear more progressive. I am not sure about that one, but as the opposition, I have to speak in this tone, even though it is the fasting month. This Bill sets a 25 percent regulatory burden reduction within a period of three years, but how is that 25 percent going to be determined? Has the government conducted an empirical study proving that 25 percent is a realistic figure, or is it merely to show that it looks like a lot, 25 percent? That is my question.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

So, in essence, Honourable Minister, the people are still burdened with various irrelevant bureaucracies, small business permits that are slow to be processed, company registration that takes months, and an unresponsive complaints system, while― Some suggestions for improvement. The first, Mr Speaker, I propose that an independent public service monitoring commission be established, rather than giving great power only to the KSN. As Betong said earlier, I also agree that digitalisation programmes should be expanded and widened in public sector transactions, as countries such as Estonia can do up to 99 per cent of these form-based transactions through digital systems. Then, third, the empowerment of services at state level and also local authorities (PBT). And fourth, incentives for excellent agencies. Earlier, the Honourable Member mentioned that action will be taken and so on. Excellent agencies, the Honourable Member did mention earlier. However, in developed countries, they give additional budgets to any excellent agency as one of the initiatives for them. That is all I want to say, Mr Speaker. Thank you.

Terima kasih.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Peace be upon you, and the mercy and blessings of God.

Thank you, Honourable Pengkalan Chepa. Please, Honourable Kota Belud.

In the name of God, the Most Gracious, the Most Merciful. Mr Speaker, firstly, I want to express my full support for this Bill. The reason is that, from the past until today, I have emphasised the government service delivery system. I have made it my priority when debating in the budget, as well as with the Royal Address. How can the people feel progress at the grassroots level? That comes from the government service delivery system, with public servants as the implementers. In fact, in meetings with government agencies, whether at federal level or state level, this is what I keep voicing. I am indeed firm and strict on this matter, and I apologise if anyone is offended. But I do not regret doing so, for what I have done. Do not let us be branded as public servants who are always absent from the office. Go and check once, they are playing golf there. On working days, yes. This is not only at the top. All the way down. What is our feeling when the people have been asking, exhaustively, to have their applications handled, any application at all, and there is no one there? Once checked, they are sitting around drinking coffee at the shop during working hours. Village folk come from far away, exhaustively, to transact, but we do not handle the people's applications or the work given to us. The people are watching outside. Governments change from political party A to political party B and so on, but the results remain the same. Now the people have become capable of judging and feel that something is wrong with our delivery system. Mr Speaker, if we as politicians do not perform for five years, we can be replaced by the people. But if our implementers do not perform, how can the people change them? I am here not to have them punished. Even the Bill tabled today is not meant to punish public servants. But I want us to think together. What we have today, outside there, many still do not get it. It is not easy to get a job in the government. Use the blessing that God has given wisely. Work for the people, work hard. That is what I keep saying, again and again, again and again: "Let us work for Sabah and the people of Sabah." In this context, let us work exhaustively, our work should be exhaustive for Malaysia and our people. If we want to advance, if we want to advance, want to move forward, we must work. How can we progress if we do not work?

Mr Speaker, the implementation of development projects, investments, initiatives and government programmes for the people does not depend solely on the Federal Government. It also involves state governments and local authorities (PBT). I also commend the implementation of the government regulatory performance rating system, which will be a medium for evaluating the performance of federal agencies, state governments and local authorities. So, for us to move forward and begin change, all three government entities, from the top level to the bottom, need reform and need change. As I have always mentioned, here in Sabah and also in Sarawak, we really need a larger allocation compared to other states. Not only because of our large area, but our basic infrastructure is still far behind. That is why I will consistently demand a large allocation every year. But, what happens at state level always disappoints me. After being given allocations and even being given the opportunity to implement these projects themselves, they still fail to spend them properly. How long will we still face issues of no water, potholed roads? Yes, in the context of Sabah, it is indeed difficult because we are vast, but there must be progress in it. I want to remind all implementers at state level in Sabah especially, please, let us work exhaustively for Sabah. Please. Remember these words of mine. If we want Sabah to progress, we must be people who work. We must work, we must work hard. Mr Speaker, one more thing, I have noticed that among the obstacles and delays in government processes is delaying tactics, buying time. Then, they ask for all sorts of documents that actually are not necessary. Simply because they do not want to make decisions and do not dare to take responsibility. "Oh, that is not my responsibility. That is their job." Such showing off. I think the KSN needs to find a way to resolve this issue that has dragged on and taken root for so long. The need to produce proactive and dedicated implementers is very, very, very much needed now. I have several questions that require clarification from the Government. First, clause 11, which states that the KSN may receive, evaluate and consider service performance reports submitted voluntarily by any government entity. My question: does this mean that state governments can make their own performance reports and be given a rating by the KSN? So, if the report is not accurate, they are still told it is accurate, what is the use? Second, regarding clause 10(6)(a), namely that the Minister may use the service performance report of a government entity as a criterion for determining the granting of government financial allocations. I support it. However, the question is, in Sabah, as I said earlier, this problem has taken root. For me, if allocations for basic infrastructure projects are reduced, it is not fair to the people of Sabah to continue being punished.

I suggest that the application of this Bill to Sabah should be implemented in stages. I request that the Minister, in making decisions, does not make a uniform decision. That is not fair. It is not fair because we are still struggling with basic necessities that have not been resolved. Perhaps there are other ways to speed up the delivery system in Sabah. Mr Speaker, in closing, each of us has a role and responsibility. I have a role, the PM has a role, the Minister has a role, public servants have a role, and the people also have a role. If we work together diligently and place love for the country at a high level, I am certain Malaysia will continue to progress and prosper. Sabah, my Sabah, Malaysia is my country. Thank you.

Thank you, Honourable Kota Belud. Please, Honourable Besut.

Thank you, Mr Speaker. Sir? Dato'? Okay, I will go straight to the policy of one in, one out. Mr Speaker, firstly, I want to touch on section 6(3) of this Bill, where if the Government wants to introduce a new regulation or new guideline, it must revoke an existing related regulation, and which regulation can actually be revoked will be determined by the Chief Secretary to the Government (KSN). I do not deny that this is necessary to avoid excessive additional regulations that burden the people. However, what is my concern is, first, the risk of losing important regulations. If an old regulation that is still important is forced to be abolished hastily to make way for new regulations, this may undermine the effectiveness of that control. Second, too much power to the KSN. The Chief Secretary to the Government has control to determine which regulations must be revoked, and this may raise issues of transparency.

[Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair] Thirdly, the abolition process may not take into account all interested parties. Engagement sessions with business parties, professional bodies or the people will be referred to before any regulation is abolished. This is the question I am posing. Although this section aims to reduce bureaucracy and excessive regulation, it may indirectly bring negative effects if not

...implemented carefully, and the vast powers given to the Chief Secretary to the Government (KSN) may be abused if they are not properly controlled. So, Madam Speaker, secondly, I would like to raise sections 10(3) and 10(6) and sections 11(3) and 11(5) concerning performance reports of government entities as a criterion for allocating finances. What concerns me is that this could open the door to misuse or political discrimination, especially against states administered by the opposition, because the Minister given this power could use performance reports as the basis for allocating funds itself to any government entity and state government. Therefore, the question is really how the government will ensure that this political discrimination does not occur. Because if we look at 10(3) and 11(3), the Minister's power is extremely large. He may consult the KSN to appoint any person, any person, yes, and also one who has suitable qualifications to examine and evaluate the performance service reports of a government entity. What does "any person" mean? It may also involve friends, involve family members, involve anyone at all. That meaning includes any person. Why don't we state that it be assessed by a specially appointed committee? An independent special committee should be appointed. Only then would the question I raised a moment ago not arise. If "any person" is broad, it covers all sorts of people. Those who are close to us in politics or in family matters and so on, friends and so on. So, this will raise a question for the public. Let us look at section 13, which also concerns the Minister's power to grant exemptions. So the Minister is given absolute power to exempt any government entity from compliance with this Act. I see that this will raise issues of transparency and bias. If it is implemented unfairly, then what mechanisms does the government have to ensure that the implementation of this Bill will be carried out fairly, as outlined? I see that this Bill, named Iltizam, is a sign of seriousness and commitment in carrying out duties, especially involving civil servants. But the problem is that there are irresponsible people, with malicious voices from certain parties, who have said they want to reduce government staff. Some say five per cent, some say up to 300,000 they want reduced, some say they want 400,000 reduced. So, I feel these matters should be stopped, and I also request the Minister: if you respond, please do not get angry with us, like the Minister of Economy. We as debaters, as the name says, debate. Our debate has our studies. So, do not sit and condemn like the Minister of Economy, who likes to condemn, our officers, PN's debaters. PN Members of Parliament are debaters. Debate involves proposing and opposing. If we want to follow what the Minister said earlier, what did he say? He said do not behave like the constitutional amendment. If we want to follow that, I can also say so.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Yang Berhormat.

Don't be a yes-man. Do it.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Yang Berhormat.

If we want to check whether the constitutional amendment is right or wrong, for those who understand law, the method of amending the Constitution was wrong.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, your time is up.

According to the law. Because the section was placed not as an exception but under another clause. From 5 to 5(a). Two different offences. One general, one specific.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Okay, thank you.

I say this, perhaps many do not understand. I think I also do not understand.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Okay, thank you.

Can you understand, Madam?

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Tak faham.

It's all right, I will try to explain.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Sila duduk.

So many yes-men. Those who support are many yes-men.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Sila duduk.

That is why we do not want to follow.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, Honourable Besut.

Okay, thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Now I invite the Honourable Bukit Bendera.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

Thank you, Madam Speaker, respected Members of Parliament and beloved people of Malaysia. Before I begin the debate, allow me to inform that we have lost a talented cartoonist, Azmi Hussin, a son of Penang who made a great impact in the world of arts. His works were not merely entertainment but recorded the culture and stories of society that are appreciated both inside and outside the country. From cartoons to murals, Azmi's art continued to inspire. I personally had the opportunity to collaborate on several art projects with him, and these became very meaningful memories. His passing is a great loss.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

However, his works will continue to be appreciated and remembered. May his soul be showered with mercy. Al-Fatihah. Madam Speaker, today we are not merely debating a bill, but we are also determining the direction of the government that Malaysia needs. The choice is in our hands, namely whether we want a government that is efficient, trustworthy and transparent, or a government that is trapped in bureaucracy, letting the people continue to suffer? Malaysia has more than 1.6 million civil servants, among the highest per capita rates in the world. With a workforce this large, should we not be achieving the highest level of efficiency? Should we not demand faster services, more efficient administration and a government that works for the people? This Bill enforces a service performance assessment system. Not merely punishment but as a catalyst for change. It demands – sorry. It demands that every ministry, agency and government entity assess themselves, ensuring inefficiency is identified and, more importantly, it can introduce a transparency system as a powerful weapon against corruption. Madam Speaker, every three years, government agencies must reduce at least 25 per cent of outdated regulations. For example, the business licensing process in Malaysia sometimes takes weeks, sometimes months to be completed. So why should entrepreneurs have to endure the hardship and exhaustion of filling in various overlapping approval forms and unnecessary delays? By abolishing irrelevant regulations, we can speed up the process and facilitate business matters and, at the same time, stimulate economic growth. This Bill also aims to ensure such reforms continue and are expanded, reducing unnecessary regulations which are often the cause of corrupt practices. A results-based performance ranking system. It emphasises rewards based on tangible achievements. Not merely efforts alone. So, imagine if every government agency held the same standards and was assessed based on their service performance, just imagine. So, with transparent performance measurement published to the public, culture, cronyism and so on can be eliminated. This is because agencies are assessed based on merit and efficiency, not relationships or rank. So this Bill ensures that civil servants adapt to the modern world. Not just remaining in outdated practices.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

So, by establishing and mandating digitalisation courses and establishing clear service guidelines, we can eliminate middlemen who may sometimes take advantage of weaknesses in the system.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

So, with permission, we need to adapt the changes as well as challenges of the 21st century. If not, our nation and our people will fall behind. So, in conclusion, as once voiced by the Honourable Tambun, Malaysia must continue to be driven forcefully and energetically. This nation has no room to be governed carelessly, aimlessly and without a clear direction. These words remind us of the importance of good governance in ensuring the well-being of the people and the progress of the nation. In closing, this Bill is not to punish but is a catalyst for change towards a government that is truly efficient, trustworthy and transparent. With that, Bukit Bendera supports. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, Honourable Bukit Bendera. I invite the Honourable Padang Rengas.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Madam Speaker, thank you for giving Padang Rengas the opportunity to debate the Iltizam Kecekapan Perkhidmatan Kerajaan Bill 2025. If implemented properly, this Bill can improve the quality of government services, reduce leakages and increase the effectiveness of public administration. However, before we pass it, several matters need to be refined. First, transparency and accountability in implementation. This Bill aims to increase efficiency but how does the government intend to ensure transparency and its implementation? Is there a clear monitoring mechanism to ensure that every ministry and agency truly achieves the set level of efficiency? What punishment or action will be taken against departments that fail to achieve their performance targets? We do not want this Bill to merely become a slogan without any noticeable change in the government service delivery system. Second, reducing bureaucracy that hampers the people's affairs. The people often complain about delays in processing documents, licence applications and various other matters that take up time. If the government is truly serious about improving efficiency, there needs to be more concrete efforts to: (i) reduce bureaucratic red tape that burdens the people and businesses, especially in critical sectors such as health, education and economic development; (ii) accelerate the digitalisation process in government services so that matters can be resolved more quickly and easily; and (iii) efficiency of expenditure and reduction of leakages.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Madam Speaker, this Bill should not only focus on the productivity of public workers alone, but also on how the government spends the people's money? The Auditor General's Report every year reveals wastage, leakages and failed projects. Therefore, I would like to ask what steps will be taken to ensure that every sen of government expenditure truly provides value to the people? Is the government prepared to introduce stricter audit mechanisms to curb wastage in public administration? Fourth, motivation and welfare of civil servants. Efficiency cannot be improved merely by imposing high KPIs on civil servants but must also consider their welfare. If workloads increase without commensurate rewards, this will only cause work stress and affect the quality of services. Therefore, the government needs to explain what incentives will be given to civil servants who show outstanding performance. How will the government ensure that this Bill is not misused to pressure civil servants with unrealistic workloads? Madam Speaker, in conclusion, this Bill is a good step but its implementation must be firm, transparent and not burdensome to civil servants and the people. If it merely becomes another document without any significant change in the government service system, then it will not bring real benefits. I hope the government can provide explanations on the issues I have raised before this Bill is passed. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, Honourable Padang Rengas. Now I invite the Honourable Putrajaya.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

Thank you, Mr Speaker. Mr Speaker, one of the focuses of this Bill is to control regulatory burden. At present there are various regulatory instruments, including subsidiary legislation, circulars, directives, guidelines, procedures and work processes. That is part of the regulatory burden or regulatory instruments that government entities must follow. My question is whether existing regulatory instruments are insufficient to improve the efficiency of government services? My second question is whether the Bill we are debating will become yet another regulatory burden on government entities? To what extent will this reporting place yet another responsibility on government entities, taking up their space and time? To what extent? Next, Mr Speaker, regarding the definition of regulatory burden, which is explained as regulatory requirements that are irrelevant, inefficient or have a detrimental effect. So this is important for all government entities in

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

talking about this Bill so that all entities know what their key business processes are? What are the main components? They must be analysed one by one to identify where the weaknesses and inefficiencies in the existing regulatory burden lie, so this is important. This leads to the next target. If it is stated in clause 6 that government entities must carry out a review of procedures under regulatory instruments and reduce the regulatory burden by 25 per cent every three years. So my question is, if we talk about 25 per cent every three years, we assume there is no new regulatory burden, yes. Say at the beginning of the year there are 10 regulatory burdens. That means 25 per cent of 10 is 2.5, and at the end of the third year there are 7.5 regulatory burdens left. That means we move to the following year, 25 per cent of 7.5 will leave 5.63 regulatory burdens. If we look at it mathematically, assuming there are no new burdens, that means the original burden still cannot be resolved even in 15 years, yes. So I want to know, what is the rationale for choosing this 25 per cent threshold? Because if we look, would it not be better for the government to make a coordination looking at the basic key audit processes altogether, and from there try to resolve these matters as quickly as possible? If they cannot be resolved, then the agencies or entities concerned must look at what resources or sources are needed from the government to resolve these matters. Otherwise, matters that could be resolved quickly, because the target is 25 per cent, will be feared to become slower in resolution because it says "at least". What does that mean? Once 25 per cent is done, the target is considered achieved. So I ask the government to provide some explanation regarding this matter. Next, clause 10, I would like to touch on clause 10.3. The Minister, after consulting with the KSN, shall appoint any person with suitable qualifications to examine and evaluate performance reports. My question is, who are these "any persons"? Are they from among government officers, or can they be appointed from the private sector, private institutions and so on to carry out examination and evaluation of the reports? Will those who carry out this examination and evaluation be paid by the government?

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

So this is a formal review process, a formal review process paid for by the government. Next, my question is, why can the National Audit Department not be given the responsibility to examine and scrutinise these reports so there is no duplication? If the National Audit Department is to be used, then the National Audit Department must be given more resources to enable them to carry it out.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

I say this because what we fear is that too many processes for reviewing these reports will make government agencies and entities become unproductive, focused on report one, report two, report three and so on. So, can it be considered whether, if necessary, it be placed under the National Audit Department so that it is more coordinated? Next, my question concerns clause 13(1), which states that the Minister may, after consulting with the KSN, by order published in the Gazette, exempt any government entity or any part of any government entity. My question is, what basis will the Minister use to exempt any entity or any of these parts? This is, I would say, too discretionary, meaning if the Minister feels this should be exempted, then this entity is exempted. So if this continues, trust in the assessment system will be affected, people will ask why this one was exempted this year? Why was that one exempted next year? So what is the actual basis that the Minister will use to assess which should be exempted, because this is too general and it involves trust in the reporting itself. Let us see later, if some are exempted, suddenly this one is exempted, that one is exempted, there are many questions about on what basis these exemptions are made. Furthermore, referring to

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Your time is up.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

Clause 10.5 which states...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, your time is up.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajaya

Sorry?

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Your time is up.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

A little, a little, I will finish this clause. Referring to clause 10.5 which states that government entities that achieve a rating may be considered for recognition incentives, and it does not mention what will happen to entities that do not achieve the appropriate standard and what form of punishment will be imposed. Furthermore, what is mentioned in that clause also concerns government allocations. This matter, this rating will be used to determine government allocations. So my question is, what weighting will be used for this rating in the context of determining government allocations. Lastly, it concerns the commitment regarding structural reform. My question is, when we talk about this structural reform, does this refer to the approach the government will use today to reduce the number of civil servants? Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, Honourable Putrajaya. I invite the Honourable Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Deputy Speaker, for the opportunity given to me to take part in the debate on the Rang Undang-undang Iltizam Kecekapan Perkhidmatan Kerajaan 2025 which was tabled and debated today. First, I listened to and examined the presentation earlier by the Honourable Minister in the Prime Minister's Department, which explained that this Bill aims to improve the efficiency, transparency, accountability and effectiveness of government services to the people while reducing the bureaucracy that has existed for a long time. I welcome it. I regard this as one of the institutional reform steps that we hope for, that the people hope for. So congratulations and well done to the Kerajaan Malaysia Madani, under the leadership of the Right Honourable PMX. We are taking steps in the right direction, and this week we have shown, we have proven to the people of Malaysia that the Kerajaan Malaysia Madani is a government that raises reform to a higher level. There are just a few questions I want to raise, Mr Speaker, today. First, I want to ask. With the introduction of this upcoming new Act, will there be an overlap of powers? We can see that this body is good. It serves as a body to monitor government agencies. But what about the existing bodies we already have, the Auditor General and so on? So, I seek an explanation from the Honourable Minister. Second, with regard to the post of KSN, the Chief Secretary to the Government. We know that in the civil service, the KSN is number one. The civil servant number one in the system we have. But, under section 8 of this Act, it makes the one who is already number one even more powerful, even more authoritative. I see everything revolving around the KSN, the Chief Secretary to the Government. What is the role of the ministry secretaries-general? The KSU in each ministry, what are their functions? Why not establish a panel or committee chaired by the KSN but with the involvement of all the KSUs? Because I feel the civil service in our country has a very large number of civil servants with a comprehensive service. One person cannot do it alone, there must be a comprehensive mechanism to monitor the existing processes. Governance cannot be monitored by only one person, there must be a committee. So, I seek the government's views. The third matter I want to mention concerns the voluntary participation of state governments under section 11. I see that state governments are not included but they can choose. Under subsection 4(b), it is said that they will receive incentives and recognition. Under subsection 5, it is said there will be financial allocations. I want to ask, what kind of financial allocations? Because there are certain financial allocations such as MARRIS for roads, which have already been determined by the Federal Constitution, regardless of which government is in power.

Tuan Cha Kee ChinDAP · PHRasahEN

must still be given. So what form will this financial allocation take, and in what aspects? I also want to ask the government, before this Bill was tabled today in this August House, were there any engagement sessions held with any state governments? What was the response from the state governments if any engagement sessions were held before this. The fourth matter I want to mention, Mr Speaker, concerns the Government Service Efficiency Commitment Report under section 12. It is stated that the report must be prepared every time, every three years, and tabled in the Dewan Rakyat. I welcome it. However, I feel that if we table it only once every three years, that is too long. It should be annually. If in this House reports from SUHAKAM and reports from the Auditor General are tabled every year, why can the report for this not be done every year? I want to point out that the word "tabled" is actually not comprehensive. "Tabled", placed on the table, is considered tabled. That is our rule. I want to say that it should, or perhaps the government could give a commitment, that it be tabled and debated in this House as we table and debate Bills, so that Honourable Members from both sides can provide input, give views, and give their respective comments on the progress of this Act. The last matter I want to mention, Mr Speaker, concerns section 13, the exemption. I heard my colleagues earlier mention that there is no scope or guideline that must be complied with before the Minister concerned, the Prime Minister, grants the exemption. True, I will remind one thing for anyone who has studied law, they will know it. Lord Acton once said that power tends to corrupt and absolute power corrupts absolutely. So I see this as a blanket that is easy to, but the Prime Minister, I believe him, he is a figure of our reform. He is very concerned about this matter, but what happens? If we get a Prime Minister who exempts everything. So the Act tomorrow, if we get a Prime Minister who likes to exempt everything, he does not want the people to know everything, what will happen? No meaning, this Act has no meaning. So I request the government to give details of how the exemption can be implemented. There must be certain constraints, certain limits. That is all my debate, thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Rasah. I invite the Honourable Member for Pasir Mas.

Thank you, Madam Speaker. Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. I touch on clause 5, the principles of commitment. In Malaysia, Madam Speaker, the total number of civil servants is about 1.6 million people, which also includes the education sector, the security forces and the health workforce. In other countries, these sectors are not counted as civil servants. If we exclude these three sectors, the number of civil servants in Malaysia is about 616,718 people, according to the data I have checked. With a ratio of one civil servant for every 51 Malaysians, it means it is not too large when compared with the exclusion of these three sectors.

We often blame the bureaucratic system as one of the causes of weaknesses in administration. However, the big question is how we want to address the attitudes and mentality in some parts of the public sector that are difficult to change. For example, although various digital systems have been introduced, many still prefer to use old methods. Delaying the performance of duties or merely fulfilling procedures without understanding the real purpose. We also see that there are agencies that prefer to act only when questions are raised or when current issues are brought up. I take as an example the case involving a comedian, the issue of Harith Iskander, who was fined RM10,000. Two months after this case occurred, two days ago the MCMC said this case was under investigation. Still under investigation. But when it was raised, in the end, everything was fine, yesterday it was announced that he was fined RM10,000 by the SKMM. The posting, two days ago, had still not been taken down. When another case occurred involving three DJs of a radio station who were said to have made insults, I want to say that the public perception seems to be that there is a weakness in taking action. So when outsiders ask, what action has been taken on the insulting issue that happened two months ago. Finally it was announced yesterday, after breaking fast, that it was uploaded on the official Facebook of MCMC, they were fined RM10,000. This means, sometimes agencies act as if only because of the issues being asked about, which happened, whereas for these two months, it seemed there was no progress. So, I want to point out that sometimes in carrying out this work, the officers in the agencies need to be more efficient in putting forward solutions and also putting forward what the resolution to an issue is. On the issue of workload, Honourable Member, Madam Speaker, Honourable Minister, we know that yesterday a Customs Appeal Tribunal Officer of the Ministry of Finance was found dead in the Treasury office of the ministry in Putrajaya.

Based on information, the body of the man, aged 45, was found lying on the floor, his neck and legs bound by a cable tie. This issue is still under investigation. The police made an initial conclusion that this was due to sudden death. But we are worried if it is linked to workload. If it originates from workload, and this is not the first case that has been linked to workload. Previously too, there were cases linked to workload which ended with things we did not want. To what extent has the workload been imposed on our civil servants today? How can this Bill provide a solution to this workload? Clause 7, the method of applying service performance. The great concern, Madam Speaker, relates to the attitude that can work, the mechanism of service performance rating for ministries and government agencies. When incentives are given based on this rating, how will the government ensure that the reports and data reported by government entities are not manipulated? What steps are there to prevent reports being made merely to obtain incentives but not reflecting the real situation? If this system is not closely controlled, we will only see beautiful figures in reports but the people will not feel any real change in government services. Today, many say that the assessment in the civil service system, although we have the Annual Performance Appraisal Report (LNPT), there is SKT and so on, but the reality is that many enjoy promotions or excellent performance said to be due to cables with bosses or superiors and so on. So, how do we ensure this can be reduced or such perceptions can be addressed? We know, Honourable Member, Madam Speaker, that in the World Competitiveness Ranking index that has already been released for 2024, Malaysia is at 34th place. In 2019, 22nd. In 2022, we were 27th. In 2021, 25th. In 2024 we are 34th. The lowest position of 34 within a few years. From 2019 until now, this is our lowest position in 2024. I still remember when we were at 27th rank. Last year we rose five steps from 32nd. A Minister proudly announced, not this Minister, another Minister, that this was a sign that Malaysia had moved forward in international competition. Today we are at 34th place, the lowest place in international competition. So, how will this Bill, I believe one of its aims is to address issues like these? But these are the figures I present, which I table to serve as a reminder to us that this is the moment we are at our lowest point in the ranking of this World Competitiveness Index.

Finally, Madam Speaker, the great power of the Minister, as has been mentioned by my fellow Members of Parliament earlier, that the great power of the Minister has exempted any government entity from the application of this Bill. My question is, we do not deny that there needs to be room for exemption. However, who will ensure that the decision on exemption is not made arbitrarily? If this reform is truly important, there should be no entity that is exempt. Instead, we see the Minister has absolute power to determine who can be exempted without referring to Parliament or other independent bodies. I suggest that there be at least a mechanism of checks and balances. For example, through a Parliamentary Committee to assess these exemption decisions to avoid abuse of power. Thank you, Madam Speaker.

Deputy Speaker, Madam Alice Lau Kiong YiengEN

Thank you, the Honourable Member for Pasir Mas. The last debater, I invite the Honourable Member for Jelutong.

Thank you, Speaker. I also seek permission to take part in the debate on this Bill. First, I would like to record my thanks to the Minister and the government for tabling this Bill. I am aware that this Bill has a good purpose, namely to improve the efficiency of the service so as to ensure that the service is efficient, effective and easily accessible. I would just like to draw the attention of this August House to several issues involving certain ministries. Generally, before I enter the substance of my speech, I want to record my highest congratulations and thanks to all civil servants who have carried out their duties excellently and well. At the same time, I also want to record my thanks to civil servants, especially from task forces such as the Royal Malaysia Police, the army, immigration and enforcement agencies. At the same time, I consider that the tabling of this Bill is necessary because from time to time we see that there are several ministries which we feel may need to play a more aggressive and more efficient role to enhance commitment. I give an example, Mr Speaker, the Ministry of Unity for instance. For the past two or three days we have seen that we are constantly plagued by issues that can divide unity among multiracial citizens. We must ensure that we respect all religions. Islam, Hinduism, Christianity, Buddhism, and in our country, we have a multiracial and multireligious Malaysian society. We always emphasise the principle of Belief in God, the Rukun Negara. All religions must be respected and all adherents must also be respected.

I draw the attention of Mr Speaker to an issue that occurred a few days ago and is happening repeatedly. I want to state here that although I am a Hindu, I want to ensure that all religions must be respected. I give the example of a person named Zambri Vinoth who deliberately keeps repeating matters, statements that can touch on the sensitivities of Hinduism. Although police reports have been made several times, we see that he has not been subject to any action. So, the question is why has he not been subject to any action? If Harith Iskander was subject to action, Cecilia Yap was subject to action, why has he not been subject to action? A person named Crimeman, he is in Germany and deliberately expresses words that insult Islam. I believe the Royal Malaysia Police has already issued a notice to arrest but he could not be traced. Unfortunately, his Facebook posts also could not be blocked, his TikTok could not be blocked. He is not in this country, he is in Germany, but his statements that insult Islam are spreading on social media.

So, my question is, how do we improve the efficiency of the Ministry of Unity to stop these statements which are laden with incitement? The same goes for Zamry Vinoth, Firdaus Wong, sometimes Zakir Naik and several individuals such as Vijayan Savarinathan and Saravanan Shanmugam. As a backbencher I want to emphasise, the efficiency of the Unity Government, especially the Ministry of Unity, must be enhanced, including the Royal Malaysia Police, because we need to ensure all parties must respect all religions. I want to emphasise. I welcome the debate by the Honourable Member for Pasir Mas earlier which touched on several issues involving Harith Iskandar and Cecilia Yap who have been subject to action. But my question is all religions must be respected, all individuals who do not respect other religions must be subject to action. So, I use this space to urge the government that this Bill on the Government Service Efficiency Commitment is something that needs to be drafted, debated and passed, and I request, if possible, with...

Tuan Khoo Poay TiongDAP · PHKota Melaka

Jelutong.

Tuan Khoo Poay TiongDAP · PHKota Melaka

Boleh?

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Jelutong. Can Jelutong agree with me, that if this Bill, if we also include state governments and also PBT, then this Bill will become better. Because at present, this Bill is only based on the Federal Government, Federal agencies, it only applies to Federal Government agencies.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

If we can include state governments, it would be better so that we can see, so that the people out there can see the performance of each state, including how Perlis, Kelantan, Terengganu, Kedah manage their states compared with other states. What is Jelutong's view?

I request that it be included in my speech, Mr Speaker, and I request once again to use this opportunity, the last before I take my leave. To the Minister on the issue of Zamry Vinoth, please take action because he has repeatedly made statements that should not have been made. Thank you, Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Jelutong. Now I ask the Honourable Minister to respond, 20 minutes.

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

Thank you, Mr Speaker. Bismillahi Rahmani Rahim, assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, first of all, allow me to record my highest appreciation to the 12 Honourable Members who took part in the debate on this Iltizam Bill, namely Honourable Member for Petaling Jaya, Honourable Member for Indera Mahkota, Honourable Member for Betong, Honourable Member for Pengkalan Chepa, Honourable Member for Kota Belud, Honourable Member for Besut, Honourable Member for Bukit Bendera, Honourable Member for Padang Rengas, Honourable Member for Putrajaya, Honourable Member for Rasah, Honourable Member for Pasir Mas and Honourable Member for Jelutong. Thank you very much for contributing sound views and constructive suggestions in the debate on this Bill. I think on the whole they support it, although some were quite critical, and some also tried to politicise this issue. But I think political issues are not relevant here, and on the whole the debate given was quite substantive. Many issues were raised, Mr Speaker, but I think in these 20 minutes I may not be able to answer all those questions. In fact, many engagement sessions (SLU) have been carried out by the technical division involving various agencies, as well as industry. So, I will touch on some of the matters that have been raised, Mr Speaker. First, on the benefits of the Iltizam Bill. In answering questions that touch on this issue, from the introduction of this Bill to the government and the people, as some of you mentioned earlier, Honourable Member for Petaling Jaya, Honourable Member for Betong, and also Pengkalan Chepa and others, the Iltizam Bill, in brief, provides direct and indirect benefits to the people and to industry. Its direct benefits: first, improved efficiency of government services. Second, a reduction

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

of at least 25 per cent in the regulatory burden every three years, which will speed up the approval process and services to the people and businesses. Third, regulatory rating of government agencies to encourage improved quality and efficiency of government services. Fourth, cost savings for the government and the private sector. Furthermore, reducing bureaucracy will also reduce the operating costs of the government and avoid repetitive documentation processes. So, some Honourable Members earlier mentioned that perhaps when making a lot of documentation, it seems to slow down our efforts to reform government services. Sixth, lower compliance costs, or compliance cost, for companies and individuals because of fewer burdensome procedures. Furthermore, transparency and accountability will also become higher. Tabling periodic reports to Parliament will enhance monitoring of the performance of government entities, and lastly, more transparent service delivery, reducing the risk of corruption and abuse of power. The benefits that are indirect include improved economic productivity. Second, increased investment and economic growth as a result of smoother business processes due to reduced bureaucracy. Third, a reduction in waiting time for approval of government documents and services will enhance the nation's competitiveness. So, this is also what some Honourable Members mentioned earlier about the long waiting times and so on. Furthermore, increased public trust in the transparency and effectiveness of government administration and, finally, an incentive system for high-performing government agencies will encourage a more dynamic work culture in the public sector. The Iltizam Bill is expected to bring about a transformation in the government administrative system by making government services more people-friendly, more efficient and not burdensome. The principles of the Iltizam Bill were also drafted to improve Malaysia's economic performance at the global level. If we look at one component of Iltizam, namely the 25 per cent reduction in regulatory burden. This has become a target widely used in various regulatory reforms at the global level. So, we take this figure not merely as a figure, but it is backed by studies carried out. So, these studies show that a 25 per cent reduction in the regulatory burden can have a large economic impact without compromising public protection. Findings from an EU study have suggested that a 25 per cent reduction in administrative burden will increase economic growth in the EU by 1.62 per cent. So, this is among the international studies that have been carried out. Apart from that, the implementation of Iltizam is hoped to also improve the competitiveness of the business sector and attract more local and foreign investment. At the same time, it will enhance Malaysia's position in ease of doing business at the global level,

Dr. Zaliha binti MustafaPKR · PHMinister in the Prime Minister's Department (Federal Territories) · SekijangEN

with permission. Structural reform under Iltizam targets an improvement in the nation's competitiveness achievement in the World Competitiveness Report (WCR), considering that 60 per cent of the qualitative data criteria for the WCR are based on the perception of the business community. The government's target through the introduction of the Iltizam Bill is to place Malaysia among the 12 most competitive economies by 2033. So, I think this answers the question raised earlier by Indera Mahkota. The second issue raised earlier concerned the application of the Iltizam Bill at the state level and also at local authorities (PBT). Earlier, the last point was also...

Dato’ Sri Saifuddin bin AbdullahBERSATU · PNIndera Mahkota

Menteri...

Dr. Zaliha binti MustafaPKR · PHSekijangEN

...mentioned about how, if we involve the state governments as well. Kota Belud also mentioned earlier...

Dato’ Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Honourable Member, if I may, before that. Just a little, just a little. Honourable Member, earlier the study in the EU, I am fine with all of that. Only, perhaps answer at the end. I mentioned earlier, for example, the open government partnership, which we in Malaysia have not done. Some countries in Europe have done it for a long time. What I am trying to state is that they use the government as a platform framework, based on the fact that they already have a foundation because they have done several things. What I mean is, like someone entering secondary school, after entering they have already completed primary school. We are leaping ahead, with permission, we are doing it like catching up. So, perhaps later it can be explained, the aspects of training for officers, because this leap ahead is like an express class from primary school to secondary school.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

That is why we now want to establish an Act. Before the Act, we have a bill first. Because, in fact, achievements or efficiencies like these have already occurred in many government agencies. We all know, and we are used to working with the government. However, when we implement this Bill, or later when it is agreed upon and becomes an Act, it will be more systematic in how we monitor work progress or work methods or governance of government officers, for example. So, that is the purpose we now have, that this Bill will later be agreed upon so that in the end we have an Act that is more comprehensive, in fact. I will continue, Honourable Member. Good. On the issue of government services that cover state governments and local governments or local authorities (PBT), and not just the Federal Government. So, in this regard, it is informed that the Iltizam Bill only applies to ministries, departments and agencies under the Federal Government, including all statutory bodies and PBTs in the Federation.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

As for state governments, state statutory bodies and state PBTs, although the Iltizam Bill does not apply to them, based on clause 11, a state government entity that wishes to implement iltizam may submit a service performance report to the State Secretary-General voluntarily or opt in, with permission. Clause 11 also provides that if state government entities, including state statutory bodies, Menteri Besar Incorporated, for example Menteri Besar Corporation, and state PBTs have submitted their service performance reports, and if they achieve a certain rating, then they are also in fact eligible to obtain incentives and any recognition, including the provision of financial funds upon achieving a certain rating. So, they are also eligible to receive incentives and any recognition, including financial funds. So, as stated in the clause as well, this report will be placed in this Parliament and can be viewed by all Members of Parliament, and it is in fact a recognition of any entity, including state governments, if they wish to join together in this Iltizam Bill. For the information of Honourable Members, the initiative to improve the efficiency of government services has already begun since December 2023, and the preparation of the Iltizam Bill has gone through various phases. It was not done hastily, in fact. Nor was it done unilaterally. It took the views of various parties. So, the process of identifying pinpoints by industry players when dealing with government agencies was carried out through 10 engagement sessions in the northern zone, southern zone, East Coast zone, in Selangor, in Putrajaya, Sabah and also Sarawak. The validation process involved 210 hours of sessions with 300 stakeholders, including industry players and regulators, and in the end 500 pinpoints were identified as burdening various business sectors. So, apart from that, engagement sessions to provide explanations and obtain suggestions for improvements in developing the principles of the Iltizam Bill, involving ministries, departments and agencies at the level of the Federal Government and state governments, were held at six locations by zone, namely the northern, southern, central zones, Federal Territory of Putrajaya, East Coast, Sabah and also Sarawak. This included providing explanations together with industry representatives through the meeting of the Special Task Force to Facilitate Business (PEMUDAH) on 5 February recently, to explain the drafting of the Iltizam Bill, in addition to obtaining industry views. In general, industry fully supports the governance reform undertaken by this government because of the mutual benefits of the Iltizam Bill, which has a high impact. Not forgetting also the engagement session with all 28 ministries and several selected agencies, which was held at the Putrajaya International Convention Centre (PICC) on 21 February 2025.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Another issue that I think many also touched on earlier is about the increasing workload of civil servants, perhaps. This matter was also raised by, for example, Honourable Member for Putrajaya and also Pasir Mas. So, the Iltizam Bill aims to improve the efficiency of government service delivery and is not in fact meant to increase the workload of civil servants. One main way to achieve this goal is by reducing bureaucratic red tape, eliminating irrelevant procedures and restructuring the forms of regulation that complicate the daily work of civil servants. If this Bill is implemented well, insya-Allah civil servants will be able to carry out their duties more efficiently because unnecessary processes will be reduced or eliminated, and the use of technology, including in reporting, will speed up service delivery, and repetitive or duplicated tasks will also be minimised. The Iltizam Bill introduces a one in, one out approach that ensures that every new rule or procedure introduced must be accompanied by the revocation of an equivalent old rule. This is to ensure that any change does not add to the overall workload. For example, if a new regulatory instrument relates to licence applications, for instance, a new one is introduced, an old regulatory instrument relating to licence applications that is also irrelevant must be revoked. This approach has also been successfully implemented in several countries that we have seen, for example the United Kingdom, Australia, South Korea, which have also been proven effective in reducing the workload of public servants and increasing administrative efficiency. Apart from that, the Iltizam Bill also emphasises the use of automation, artificial intelligence (AI) and system integration to reduce manual and repetitive tasks that often become a burden to civil servants. For example, the MyBorder Pass system at KLIA has also expedited immigration checks using QR codes, reducing the workload of immigration officers themselves. Likewise at DBKL, for example. I am giving this example. Applications for permits for planning permission approval, whose process was improved from hundreds of days previously, then became 48 days and were further accelerated to seven days starting 1 October 2024 with the use of the OSC 4.0 system. Apart from that, Halal Malaysia Certification 2.0 under JAKIM has also reduced halal certification procedures from 11 to only eight steps, thereby speeding up processing from 63 days to just 23 days. So, all of these, Mr Speaker, these initiatives prove that the Iltizam Bill is not intended to increase workload but to reduce manual tasks that waste time and energy.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Apart from that, the Iltizam Bill also introduces a regulatory rating system to encourage a more dynamic and high-performing work culture in the public sector. This rating system enables each government agency to measure its performance based on the efficiency of service delivery, obtain incentives if it achieves a better level of efficiency, and increase accountability with the existence of this system. Government agencies will focus more on the effectiveness of work compared with rigidly complying with procedures, which will ultimately increase the satisfaction of civil servants because they will also carry out their tasks more efficiently and effectively. The implementation of regulatory burden reduction systems in other countries also shows that civil servants do not experience increased workloads but, on the contrary, are able to work more efficiently. For example, in Canada, regulatory burden reduction through the Red Tape Reduction Act 2015 succeeded in eliminating unnecessary procedures, thereby enabling civil servants to focus on more productive tasks. In the Philippines, the Ease of Doing Business Act 2018 introduced a monitoring system on the performance of civil servants that increased productivity without adding to their workload. In South Korea, the Sunset Clause system ensures that every new law or regulation must be reviewed within a period of three to five years to ensure there are no irrelevant rules that burden civil servants. So, the Iltizam Bill takes inspiration from these models but adapts them to the Malaysian context to ensure there is no increase in workload for our civil servants. The Iltizam Bill also does not introduce punishments. It is not punitive, Honourable Member for Betong, towards civil servants who fail to implement changes; instead, it uses incentive mechanisms and periodic monitoring. There are no automatic penalties or disciplinary actions against civil servants who do not achieve targets; instead, their performance will be measured and they will be given support and additional resources to improve their effectiveness. For example, through the Demerit Performance Evaluation System (DEEP), leaders in the public sector will be evaluated based on their KPIs, KPI achievements, but this evaluation is more about improvement and not merely punishment.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

So, I have explained to Honourable Members that the Iltizam Bill is not about giving additional work but about changing the way of working so that it is more systematic, digital and oriented towards the best results for the people. I would also like to touch on the fact that the Public Service Remuneration System (SSPA) introduced significant salary increases for civil servants, so with this salary increase, already

Dr. Zaliha binti MustafaPKR · PHSekijangEN

there will certainly be higher expectations of the performance of civil servants, including their ability to work more efficiently and responsibly. In this context, the Iltizam Bill restructures the way work is done to make it more efficient by abolishing unnecessary procedures. Civil servants will no longer need to deal with repetitive regulations and work processes or waste time, but will instead be able to focus on tasks that may be more strategic and also high-impact. The fourth issue I want to touch on concerns regulatory instruments. Why must regulatory instruments be reduced? So, I want to take this opportunity to make clear to the Honourable Members who raised this issue earlier. The Government intends to reduce regulatory instruments, which cover regulations as well as directives, circulars, guidelines, procedures and work processes issued by government entities. Although they are intended to ensure orderly administration, these instruments sometimes become overly complex or no longer relevant, causing high compliance costs and slowing down administrative processes as well as business. To address this issue, the Government has introduced several key mechanisms to reduce the regulatory burden. First, the Iltizam Bill provides that every regulatory instrument must be reviewed every three years to ensure it remains relevant and also effective. This review will identify regulatory instruments that can be simplified or abolished to avoid duplication or inefficiencies in administration. Second, the Government has set a target to reduce this regulatory burden by 25 per cent within three years. Based on the study I mentioned earlier, international research shows that this measure can boost economic growth and also the country's competitiveness. Third, the Iltizam Bill introduces a one in, one out approach, whereby for every new regulatory instrument introduced, one equivalent old regulatory instrument must be revoked. This is intended to ensure that the total number of regulatory instruments does not increase uncontrollably and to prevent regulatory instruments that burden the people and businesses. Fourth, the Government may also use the standard cost model, or SCM, to calculate the compliance cost of a regulatory instrument and determine whether it should be retained, amended or abolished. This model ensures that the reduction of the regulatory burden is carried out systematically without compromising public interest. So, I have rejected earlier the claim that only one party will decide this matter. The Iltizam Bill also ensures that every ministry and agency must report its achievements in reducing the regulatory burden, and this report will

Dr. Zaliha binti MustafaPKR · PHSekijangEN

be tabled in the Dewan Rakyat to ensure transparency and also the effectiveness of the reform's implementation. The fifth issue raised earlier concerns exemptions from the Act. So, the Iltizam Bill provides an exemption mechanism to ensure that the implementation of regulatory reform does not disrupt the Government's critical operations, particularly in sectors involving security, national interest and also unforeseen situations. The exemption provision empowers the Minister responsible, after consultation with the Chief Secretary to the Government (KSN), to exempt any government entity or part thereof, and any regulatory instrument or part thereof, from the application of this Iltizam Bill. This exemption is intended to provide flexibility in implementation without compromising the Government's essential functions. However, the Minister may also revoke such an exemption if there is a need to realign a regulation with the objectives of Iltizam reform. So, several situations allow a government entity or regulatory instrument to be exempted from the application of this Bill. For example, regulatory instruments in the health sector and security sector may be considered for exemption through an application to the Minister. Although this Bill...

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

Honourable Minister. May I have a little?

Dr. Zaliha binti MustafaPKR · PHSekijangEN

I'll just finish a little.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajaya

Sedikit boleh?

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Just a little, let me finish this first.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajaya

Okey.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Although this Bill allows exemptions, it is still strictly regulated to avoid any misuse. The decision to grant an exemption must go through consultation with the KSN, and all exemptions will be published in the Government Gazette to ensure transparency. This is the mechanism for transparency. So, the Minister also has the power to revoke an exemption if it is found to be no longer relevant or misused. This ensures that any exemption is granted only when truly necessary and does not hinder the main objective of the Iltizam Bill in improving the efficiency of government administration. Please.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

A little. Earlier, the Minister gave an example of exemptions for instruments. If possible, could the Minister give a little example of exemptions for this entity? So that at least there is a record here of the situations that allow an entity to be exempted. Thank you, Minister. [Mr Speaker presided over the sitting]

Dr. Zaliha binti MustafaPKR · PHSekijangEN

May I answer that one later, Honourable Member? So, let me continue first. In brief, Mr Speaker, Honourable Members, there are no circulars, procedures or regulations that are exempt from the application of this Iltizam Bill, including the meeting rules that we all use in this august House. I will touch on the next issue. May I have more time?

Mr SpeakerEN

Yes, how many more minutes do you think, Minister?

Dr. Zaliha binti MustafaPKR · PHSekijangEN

I think perhaps five minutes, could it be 10 minutes?

Mr SpeakerEN

Okay, 10 minutes.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Good. The sixth issue concerns the governance and monitoring of the Iltizam Bill. Many also raised this earlier. So, regarding the governance of the Iltizam Bill in its implementation, inter-ministerial coordination will be decided and coordinated by the Chief Secretary to the Government. Apart from that, a regulatory rating system will be used as a more granular monitoring mechanism, whereby government agencies that succeed in reducing red tape and improving efficiency will be given incentives or recognition. With this structured monitoring, the Iltizam Bill can be implemented more effectively and also ensure that the reforms introduced directly benefit the people and also the economic sector without compromising the efficiency of government governance. In the implementation of this Iltizam Bill, the Minister is responsible for tabling the Iltizam report in the Dewan Rakyat every three years and for issuing exemptions for certain entities after consultation with the Chief Secretary to the Government. The KSN, meanwhile, coordinates the implementation of reform across all ministries and agencies, ensures periodic reviews every three years, and manages the regulatory rating system to give incentives to high-performing agencies. Heads of entities, including Secretaries-General of ministries and Directors-General, are responsible for reducing the regulatory burden in their respective organisations, ensuring compliance with one in, one out, and reporting the status of implementation to the KSN and the Minister to ensure the effectiveness of Iltizam's implementation. I would also like to touch on the role of the private sector here. I think this last issue will need more time if I am given more time. The final issue, Honourable Members, is that the Iltizam Bill also emphasises the role of the private sector in regulatory reform through more systematic and also inclusive mechanisms. One of the main platforms used by the Special Task Force to Facilitate Business (PEMUDAH) serves as the official platform for engagement between the Government and the private sector before any new policy or regulation is introduced. Through PEMUDAH, the Government can identify the main challenges faced by the business world and then develop regulatory solutions that are more targeted and investor-friendly. This means that any decision related to

Dr. Zaliha binti MustafaPKR · PHSekijangEN

the abolition or simplification of regulations is not made unilaterally by the Government but obtains views and also feedback from various stakeholders. With this more active involvement of the private sector, regulatory reform will be more relevant and in line with industry realities, avoiding regulations that are too burdensome or impractical. Apart from that, the Iltizam Bill also opens up space for closer cooperation between the Government and the private sector in aspects of innovation and digitalisation to accelerate the delivery of public services by reducing the regulatory burden. Private companies can also play a bigger role in supporting government digital initiatives, including through the development of automation systems, smart applications and also data integration to facilitate dealings with the Government. For example, simplifying licence and permit application processes can also be done through digital platforms operated jointly by the Government and local technology companies. In this regard, the private sector functions not only as a beneficiary of regulatory reform but also as a strategic partner in developing more efficient solutions for the business ecosystem and national administration.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

This is in line with the approach taken by several developed countries such as the United Kingdom and also Singapore, where the private sector is given space to contribute to the design and implementation of regulatory reform more actively. The eighth matter of the Iltizam Bill that conflicts with existing law. The Iltizam Bill is intended to replace existing laws and ─ but it does not act as a – but it also acts as a complement to ensure government regulation is more efficient and responsive to current needs. To ensure its effectiveness, the implementation of this Bill needs to be aligned with other related laws to avoid any legal conflict or overlap of powers between government agencies. What this means is that it becomes a complement; it does not repeal existing Acts. Therefore, the reform brought by the Iltizam Bill requires coordination with various ministries and regulatory bodies to ensure a balance between administrative efficiency and compliance with the principles of transparency and good governance. Apart from that, the application of the Iltizam Bill by state governments and local authorities must also take into account state laws to ensure uniformity of implementation without affecting the respective jurisdictions. So, Tan Sri Mr Speaker, I think for anything I have not answered, I can answer in writing. May I?

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

Minister, just one question. Clause 10(3) concerns the definition of "any person". I asked what is meant by "any person", whether government officers, private individuals or institutions, and whether they will be paid by the Government to carry out the assessment, and also whether the role of the National Audit Department has been considered in this context so that there is no duplication. Thank you.

The same point, Minister.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

As for the selection of the person, actually there are criteria that will be set to determine who can be made into a group for us to use as reference and so on. As for payment, so far it is considered as pro bono, yes. But there may be costs involved. Perhaps we could – perhaps allowances could be given and so on, that will be considered. Good.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajayaEN

This is not a proper audit. Surely the Government does not engage an audit company to carry out an audit, and its part is absent. This is a...

Dr. Zaliha binti MustafaPKR · PHSekijangEN

For now, we are not considering that further.

Datuk Dr. Radzi bin JidinBERSATU · PNPutrajaya

Okey.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Only what we said earlier, those persons are the ones whose specific criteria will be examined.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Tan Sri Mr Speaker...

Minister, I raised the same point during the debate earlier. Can it be that the Minister's power to appoint any person, any person in question, we determine directly who this any person is? If we put it in this section, it means it is open. The Minister's power is broad. So, we directly appoint an independent committee that has the qualifications and can assess any performance whatsoever. This concerns the provisions to be made available, which can be chosen later. That is the major problem. Directly appoint an independent committee, can we?

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Thank you, Honourable Member for Besut. I think that can be considered, but so far, the term we have placed in this clause in the Bill is "persons", yes. But of course, at the same time we will also develop guidelines, yes. So, I think in the guidelines we can look at such matters. Thank you. So, Tan Sri Mr Speaker, in conclusion I hope all Honourable Members will support this Iltizam Bill, or the Government Service Efficiency Iltizam Bill, and together we create history in governance reform for this people. So, support for this Bill will certainly present Honourable Members as champions of efforts for government service efficiency. So, this step also...

Dato' Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

Honourable Member, Mr Speaker, I really want to support this, but there's no need to answer this one. I just want to repeat

Dato' Sri Saifuddin bin AbdullahBERSATU · PNIndera MahkotaEN

my call. Mr Speaker, earlier I called for this, I said that we have developed a great deal, civil servants have carried out all kinds of reforms, but they have constraints because of political interference, this and that and so on. Mr Speaker too was once an Administrative and Diplomatic Service (PTD) officer. So, earlier I proposed to the Honourable Member that perhaps in the next session a ministerial statement be made on the whole matter of the public service in Malaysia. If there were a white paper, that would be even better, but there is no need for a white paper, rather a report, and we debate it with the intention of providing support for improvement. Thank you.

Dr. Zaliha binti MustafaPKR · PHSekijangEN

Thank you, Indera Mahkota. For now we have not yet considered a ministerial statement on that, but I think in that process later, if necessary, perhaps we can make a ministerial statement. Good, let me continue, Yang di-Pertua. So, this step is actually also in line with the MADANI Government's agenda that upholds good governance to attract investment and provide a healthier Malaysian economic ecosystem. So, after this Bill is passed, it is hoped it will no longer be merely a dream, but it is almost certain that Malaysia will be among the 12 most competitive economies by 2033. Besides allowing us to improve the country's position in the World Competitiveness Ranking and also improve Malaysia's position in the Corruption Perception Index (CPI), as I mentioned earlier. So, to conclude, Tan Sri Mr Speaker, may I, as usual, be permitted to present two stanzas of pantun. The Iltizam Bill has been read, Reform is not just empty promises, Efficient service does not delay time, The people are relieved and also glad. Once we queued up long and winding, Waiting for documents until we dozed off, Now the system is more perfect, Work is completed, no one suffers. That is all, thank you.

Mr SpeakerEN

Good. Thank you, Minister. Honourable Members, I now put the question to the House for decision. The question is that this bill be read a second time now. [Question put and agreed to] [Bill read a second time and committed to the House as a Committee] [The House resolved into Committee] [Mr Speaker presided over the Committee] [Clauses put to the Committee] [Clauses 1 to 14 ordered to form part of the Bill]

Mr SpeakerEN

[Bill reported to the House now] [The House resumed sitting] [Bill reported without amendment; read a third time, supported by the Deputy Minister of Transport (Datuk Haji Hasbi bin Haji Habibollah) and passed]

Bill — Employees Provident Fund (Amendment) Bill 2025 Second and Third ReadingsBill

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

Tan Sri Mr Speaker, I beg to move that a bill to amend the Employees Provident Fund Act 1991 be read a second time now.

Mr SpeakerEN

Please proceed. Is there anyone who supports?

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · Limbang

Saya mohon...

Mr SpeakerEN

Not yet, just a moment. Sorry, Minister, please continue.

Tan Sri Mr Speaker, in the Budget 2025 speech by the Right Honourable Prime Minister cum Minister of Finance on 18 October 2024, the Government proposed to make it mandatory for all non-citizen Malaysian workers to contribute to the KWSP scheme. This proposal is in line with the Government's commitment to give fair treatment to all workers regardless of citizenship. To implement this proposal, there is a need to amend the Akta Wang Kumpulan Simpanan Pekerja 1991 (Akta 452) through the Kumpulan Wang Simpanan Pekerja (Pindaan) Bill 2025, which aims to make provision in relation to the liability to pay contributions and the contribution rates imposed on non-citizen Malaysian workers. This Bill has 11 clauses as follows. Clause 1 contains the short title and commencement of the proposed Act and empowers the Minister to appoint different dates for the commencement of different provisions under the proposed Act. Clause 2 seeks to amend the heading of Part VIIA of Act 452 to replace the words "ahli kumpulan wang" with the word "pekerja" so as to be consistent with the amendment made under clause 3. Clause 3 seeks to replace section 70A of Act 452 with a new section to provide that Part VIIA of Act 452 applies to non-citizen Malaysian workers whose country of domicile is outside Malaysia and who

entered and stayed temporarily under the authority of any pass issued under the provisions of any written law relating to immigration. Clause 4 seeks to amend section 70C of Act 452 as follows: (a) sub-clauses 4(a) and (c) seek to amend subsections 70C(1) and (3) of Act 452 to replace the words "Ahli Kumpulan Wang" with the word "Pekerja" so as to be consistent with the amendment made under clause 3; and (b) sub-clause 4(b) seeks to delete subsection 70C(2) of Act 452 to allow non-citizen employees who have withdrawn the entire amount in their account to continue contributing without having to submit a notice to contribute to the EPF. Clause 5 relates to subsection 70D of Act 452. Clause 7 relates to subsection 7FA of Act 452. Clause 8 relates to section 7H of Act 452, which is amended to replace the words "Ahli Kumpulan Wang" with the word "Pekerja" so as to be consistent with the amendment made under clause 3. Clause 6 seeks to amend section 70E of Act 452 as follows: (i) sub-clause 6(a) seeks to insert a reference to subsection 43(8) of Act 452 to exempt non-citizen employees from making voluntary contributions; (ii) sub-clause 6(b) seeks to delete the reference to subsection 55A other than subsection (2) of Act 452 to allow non-citizen employees to withdraw all or part of the amount in their account when the employee reaches the age of 55; and (iii) sub-clause 6(c) seeks to replace the words "ahli kumpulan wang" with the word "pekerja" so as to be consistent with the amendment made in clause 3. Seventhly, clause 9 seeks to amend the First Schedule of Act 452 by deleting paragraphs 6 and 7 of the Schedule so as to impose a liability to pay contributions on non-citizen employees. Eighthly, clause 10 seeks to amend the Third Schedule of Act 452 to delete Parts B and D and to insert a new Part F to prescribe the contribution rates applicable to non-citizen employees. Ninthly, clause 11 deals with transitional provisions. Therefore, the proposed amendments to the Employees Provident Fund (Amendment) Bill 2025 are essential to implement the mandatory liability to pay EPF contributions for non-citizen employees

who are non-citizens of Malaysia, in line with the Budget 2025 initiative which aims to enhance equal social protection between Malaysian citizen employees and non-citizen employees in the labour market. Mr Speaker, I beg to move.

Mr SpeakerEN

Alright, is there anyone who seconds?

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

I beg to second.

Mr SpeakerEN

Alright, thank you. Honourable Members, the question before the House is that a bill entitled an Act to amend the Employees Provident Fund Act 1991 be read a second time now and be open for debate. I have received a list of eight debaters. I will read out their names. Honourable Bagan, Jerlun, Tawau, Pasir Mas, Mas Gading, Shah Alam, Machang and Seputeh. We will begin with Bagan and he is given five minutes. Please proceed, Bagan.

Tuan Lim Guan EngDAP · PHBaganEN

Thank you, Tan Sri Mr Speaker. Tan Sri Mr Speaker, I would like to propose that the EPF employer contribution of RM5 per non-citizen employee be retained together with the EPF share of foreign workers at 11 per cent. The proposal to increase the employer contribution by RM5 for each foreign worker to two per cent, while the voluntary contribution to the EPF by foreign workers is proposed to be reduced from 11 per cent to a mandatory two per cent. The proposed two per cent employer contribution has caused dissatisfaction, as they were already burdened by amendments to the Employment Act that came into force in 2024, as follows: (i) the total weekly working hours were reduced from 48 hours to 45 hours, which increased wage costs by 10 per cent; (ii) paternity leave of seven days for the first five children; and (iii) maternity leave extended from 60 days to 98 days. All of these add to the burden on businesses, especially SMEs, but they are willing to sacrifice for the welfare of Malaysian workers. The question they raise is why Malaysian employers, especially SMEs, must make sacrifices for foreign workers with a two per cent EPF contribution? The EPF contribution by foreign workers should be reduced from 11 to two per cent. Can the EPF state what additional contributions could be received from this two per cent employer share? I disagree to some extent with the view given that the reluctance to make EPF contributions mandatory for employers will result in Malaysia and employers being subject to sanctions for failing to comply with the rules of the United Nations and the International Labour Organization (ILO).

Tuan Lim Guan EngDAP · PHBaganEN

If that is true, why has the ILO not imposed any sanctions on Singapore? Although Singapore no longer requires employers to make the same CPF contributions as the EPF here for foreign workers since 2003, there has been no action by the ILO or the United Nations. Mr Speaker, Singapore can exempt foreign workers from CPF contributions without any sanctions, and Malaysia did the same previously. We do not make EPF contributions mandatory for local employers. Why must local employers be made to pay EPF contributions for foreign workers? Now we see that the new President of the United States, Donald Trump, openly flouts the rules of the United Nations and the ILO arbitrarily, and will even withdraw from several major United Nations institutions without any response or punishment. So, indeed those institutions have no moral standing, with respect, to impose any sanctions on Malaysia. Therefore, why should Malaysia have to comply with international rules that harm our country and local businesses? When has the United States been so bold as to protect the interests of its people, its country and its businesses regardless of these international rules? Mr Speaker, the rationale for making employers pay EPF contributions. With such contributions, it may create job opportunities with more competitive wages for Malaysians, but with the existence of the equal or labour flying fee, it does not reflect the actual situation where there is a shortage of local workers. We know there are indeed local jobs because the unemployment rate is expected to fall to 3.1 per cent this year. In other words, we will experience a state of full employment. Therefore, this shortage of workers can at present only be filled by foreign workers. Without foreign workers, I feel it is difficult for us to run operations in many factories. I think Mr Speaker is also more aware of this than I am. The proposal for automation in industry requires large investment that cannot currently be met by private companies and the government. Therefore, in the current uncertain global economic situation, especially with the arbitrary implementation of tariff policies by Donald Trump, I would like to propose that the employer contribution be retained at RM5 per foreign worker or be deferred temporarily until economic conditions allow. Let us help Malaysian businesses first, put Malaysian business first, with respect. Thank you.

Mr SpeakerEN

Alright, thank you. I call Jerlun.

In the name of God, the Most Gracious, the Most Merciful...

Tuan Chong ZheminDAP · PHKamparEN

Tan Sri Speaker, there is a Point of Order 36(12). Any Member who makes a statement that misleads the House shall be deemed

Tuan Chong ZheminDAP · PHKamparEN

to have insulted the House, and that Member may be referred to the Committee on Rights and Freedoms. On 5 February, Ayer Hitam, in this House, made a statement that there was a loss of 500 million ringgit to MAHB in the transactions of MAHB by the EPF, and this statement clearly contradicts the statement I made and also the statement issued by the Ministry of Finance (II) that there was no loss at all. So it is impossible for all three of us to have given a correct statement. So I have received it and I have referred Ayer Hitam's use of Standing Order 36(12) and sent it to the Speaker. Today I received a decision from the Speaker. I want to get certainty from the Speaker because this Standing Order was rejected on three grounds. Say there are three elements that must be fulfilled. First, the statement given must be a statement that misleads the House. I think there is no issue with this. Second, the Member who made the statement must have known at the time the statement was made that the statement was inaccurate, and at the time of making the statement, that Member intended to mislead the House. So, I want certainty from the Speaker. Does this mean that at the time Ayer Hitam made the statement, he did not know that the statement was inaccurate? It means his understanding was not correct. So, it is impossible for Ayer Hitam to be right and also for me and the Minister of Finance II to be right, it is impossible. One of them must be wrong. So, I want certainty from the Speaker as to why I received this decision.

Mr SpeakerEN

Alright, Ayer Hitam – Ayer Hitam again. Fasting, and he has become confused. Kampar, in our Standing Orders, if the Honourable Member is not satisfied with my decision, the Honourable Member may appeal, write again, and I will reconsider. I will not sleep at night monitoring every sentence that Kampar...

Tuan Chong ZheminDAP · PHKamparEN

Tan Sri Speaker, I understand and I also respect the Speaker's decision.

Mr Speaker

Ya.

Tuan Chong ZheminDAP · PHKamparEN

I want to get certainty...

Mr Speaker

Ya, ya.

Tuan Chong ZheminDAP · PHKamparEN

...Based on this element, does it mean...

Mr SpeakerEN

I cannot – we cannot...

Tuan Chong ZheminDAP · PHKamparEN

Does it mean that Ayer Hitam at that time did not know that the statement was inaccurate, meaning he had misunderstood.

Mr Speaker

Baik.

Tuan Chong ZheminDAP · PHKamparEN

Because it is impossible for him to be right, and for me and the Minister of Finance II to be right too.

Mr Speaker

Betul.

Tuan Chong ZheminDAP · PHKamparEN

One of them must be wrong. He said there was a loss, we said there was no loss. So someone must...

Mr SpeakerEN

Yes, this is my decision.

Tuan Chong ZheminDAP · PHKampar

Ya, ya.

Mr SpeakerEN

My decision – listen carefully. The Honourable Member writes a letter to appeal so that I can review the decision that has been made, because we do not have time to debate it here. Thank you.

Tuan Chong ZheminDAP · PHKamparEN

Okay, thank you.

Mr SpeakerEN

Alright, Jerlun, please proceed.

In the name of God, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Mr Speaker, in Budget 2025 last year, the Most Honourable Member for Tambun announced the government's proposal to make it mandatory for foreign workers to contribute to the EPF, just as it is mandatory for local workers. Under the parent Act, the Employees Provident Fund Act 1991 states that foreign workers in our country are given freedom whether to contribute to the EPF or not. There are 11 foreign countries permitted to work in our country, for example Indonesia, Bangladesh, Pakistan, Nepal, Thailand and so on, in five specific sectors namely manufacturing, construction, plantation, agriculture and services. In this regard, Jerlun is of the view that by making it mandatory for foreign workers to contribute to the EPF, it can benefit the country. The benefits are, first, contributions from foreign workers can increase the amount of funds to be managed by the EPF. These funds can be used for investment in development projects, infrastructure, local enterprises and other strategic sectors that contribute to the country's economic growth. Second, when the EPF has more funds and is ready to increase investment, it means the EPF can expand its portfolio in the local stock and bond markets. This helps to stabilise and strengthen the domestic capital market. It makes it more attractive to foreign investors and domestic investors. Third, foreign workers who have retirement savings through the EPF tend to be less dependent on social assistance. When they retire or face emergency situations, this can to some extent reduce the financial burden on the government in providing a social safety net. Fourth, by including foreign workers in the retirement savings system in our country, it fosters a sense of attachment and shared responsibility towards the Malaysian economy. This can increase their productivity and commitment to national development. Fifth, through EPF contributions, information about these foreign workers can be recorded more systematically. This facilitates monitoring of their working conditions and

ensuring they receive appropriate protection in line with international labour standards. I refer to this blue bill.

Clause 2 of this Bill, namely the amendment to Part VIIA, which mentions replacing the words 'ahli kumpulan wang' with the word 'pekerja'. I refer to the parent Act, where this term 'ahli kumpulan wang' also appears but has not been included as part of this amendment. Only section 70A of Part VII was taken. Why not take section 2? Because section 2 serves as a reference for the interpretation and defined terms for the subsequent provisions. Do not take it in the middle. It should be taken at the beginning as a reference. Under the Immigration Department of Malaysia, the Ministry of Home Affairs sets the condition that foreign workers may apply to work in the country starting from the age of 18 until 45. When the application of these foreign workers is approved, they will hold a visit pass, that is temporary employment PLKS, where the period they are allowed to work starts from 12 months or one year up to 10 years. If we refer to clause 10(b), the amendment to the Third Schedule, which creates Part F, in which the employer contribution rate and the employee contribution rate are each two per cent. I think this rate is very small, very little compared with the rate for local workers. If the government truly wants to see the EPF fund grow and be able to contribute, to improve the economy and boost development in the country. Let us look at local workers' contributions. For a salary of RM5,000 and below, the employee contribution is 11 per cent and the employer contribution is 13 per cent. Meanwhile, for a salary of RM5,000 to RM20,000, the employee contribution is 11 per cent and the employer 12 per cent. My question here. Why is there a significant difference between the government's proposal to impose a contribution or a contribution by foreign nationals of only two per cent compared with local workers' 11 per cent? Yet the purpose of the contributions just mentioned is, among other things, to boost the country's economy. If we look at the maximum working period of foreign workers, it is 10 years. There are also local workers who can only work for 10 years, but their contributions remain at 11 per cent. So, Jerlun proposes that the EPF contribution of foreign workers be increased from two per cent to a reasonable amount or equal to the 11 per cent contribution rate of local workers. One more matter concerning the EPF. I request that the government reconsider allowing withdrawals from Account 1 for EPF members who have not yet reached retirement age but have received an offer to perform the haji pilgrimage. This is because the cost of the haji pilgrimage now has risen to as much as RM33,300 per pilgrim. I was informed that some prospective young pilgrims who received a haji offer have to decline the offer because they have no other financial source apart from

the EPF to make up the amount needed to pay the cost of the haji pilgrimage. Last, one more matter. I also request the government to consider allowing withdrawals from Account 1 at a reasonable rate. For Account 2 or Account 3, these have been left empty, withdrawn or no longer active, for the purposes of education, treatment or settling debts. I have received many e-mails from these EPF contributors who complain because they do not have any other financial sources except Account 1 in the EPF. So, I request the government's consideration to do the best for the people in our country who are suffering this hardship. Thank you, Mr Speaker.

Mr SpeakerEN

Alright. I call Tawau.

Tuan Lo Su FuiPBS · GRSTawauEN

Thank you, Mr Speaker. Greetings of peace and greetings of a prosperous and progressive Sabah. Mr Speaker, the Employees Provident Fund (Amendment) Bill 2025 is a significant amendment and brings benefits to both foreign workers and employers. I thank the government for the efforts introduced. I have noted the surge in the number of contributors from 22.6 thousand to nearly 2.5 million non-citizen contributors. This can have a good impact on the contributors and the country. I hope that with this increase in the number of contributors, the total annual returns can also be raised to benefit all EPF contributors. The steps taken by the government, looking at international capital, are the right step in driving the country's development, in line with developed countries internationally. However, Mr Speaker, I would like to offer some suggestions on this amendment bill. First, I hope that while we implement this, we are able to provide certainty to investors or employers. Avoid causing worry and anxiety about this Act, the uncertainty of its implementation. For example, the contribution rate for contributors may also be changed from time to time without briefing employers. This will affect the emotions and confidence of investors. Therefore, it will affect the performance of economic development in our country. Second, I would like to refer to one thing while we carry out this implementation step of increasing the minimum wage. As an example, as a reflection of the implementation of this PERKESO amendment. On several occasions when we increased the minimum wage, I observed many job losses. Because for employers, to save costs, to maintain their companies' competitiveness, they have to dismiss workers who have less capability.

Tuan Lo Su FuiPBS · GRSTawauEN

Malaysia is not like overseas. Overseas, they take steps such as offering skills upgrading courses or courses like TVET for low-skilled workers, ensuring they get the space and opportunity to upskill their workers. But in Malaysia, where the minimum wage has been raised several times, I do not see any follow-up action to ensure employment. Like Sabah. Sabah is not like the Peninsula. We do not have many factories here. So, I myself experienced the season of the minimum wage increase. Many workers were retrenched. This continues to affect their welfare and the livelihood of their families. So, I myself call on this occasion: if at this level there remains a major burden on employers, I hope a reasonable step will be taken, which we can implement. Let us ensure that there is no incident of workers being dismissed. Mr Speaker, there is also one issue I want to draw to the attention of this honourable House, namely the issue of the undocumented, who are a unique group in Sabah. In Sabah, we have more than a million undocumented persons, where the typical case, 99.9 percent, occurs when the father is a citizen and the mother is not a citizen. Under the Constitution of Malaysia, this group should be eligible to apply for citizenship. But before Sabah and Sarawak, we formed Malaysia with Malaya. Most of their marriage certificates were not recognised, or the policy, late registration, was because transport in Sabah was not very good in the past. Now, with the fifth generation of these descendants arriving, they are allowed to live in Malaysia but are not allowed to attend school or work.

Tuan Lo Su FuiPBS · GRSTawauEN

So, in this amendment, I hope for the consideration and goodwill of PERKESO (Social Security Organisation) or the government, so that we can absorb these undocumented groups. Meanwhile, I hear there is an effort by the government to recognise UNHCR, but why do we not absorb these groups who, after 50 years, have long been living in Sabah, as a group contributing to the Employees Provident Fund (KWSP)? That is all. I hope there will be consideration and goodwill from the government and the KWSP. Thank you.

Mr SpeakerEN

Alright. Thank you, Tawau. I invite Pasir Mas.

Assalamualaikum warahmatullahi dan salam sejahtera. Thank you, Tan Sri Mr Speaker. I thank you for giving me the opportunity to also debate the Employees Provident Fund (Amendment) Bill today. I begin with Malaysia's competitiveness in attracting foreign workers.

Tan Sri Mr Speaker, in global economic competition, every country strives to attract high-quality labour to contribute to industrial growth and innovation. The question we must ask is whether this measure will reduce Malaysia's competitiveness in attracting quality foreign workers when we impose mandatory contributions on foreign workers. Neighbouring countries such as Singapore and also the United Arab Emirates, for example, do not impose mandatory contributions on foreign workers. If Malaysia begins to impose this additional condition, it is not impossible that high-quality foreign workers will shift to countries offering more flexible conditions. We are not against this measure, but these are the concerns that have arisen, which the government should address. It may cause us to attract only less skilled workers, who contribute less to the country's economic development. I cite the World Bank data of 2023. Labour costs in Malaysia have increased by 3.5 percent every year. The additional KWSP contribution at a minimum of 13 percent will add to this burden. The Department of Statistics Malaysia (DOSM) report of 2023 states that the manufacturing and plantation sectors, which employ many foreign workers, contribute 22.8 percent to GDP. Any increase in costs may affect the prices of basic goods such as palm oil and rubber. Tan Sri Mr Speaker, the risk of employers hiring short-term contract foreign workers must also be taken into account. How will the government deal with the possibility of employers trying to avoid this by hiring foreign workers on short-term contracts? If employers see this contribution as a financial burden, they may hire foreign workers for shorter periods to avoid their responsibility to contribute. Moreover, we face the risk of an increase in the hiring of foreign workers without valid documents, because employers will look for ways to reduce their costs. We do not want a policy intended to protect foreign workers to ultimately open up space for the exploitation of foreign workers through non-permanent contract schemes. We also know that even in the existing system, there are employers who fail to contribute to the KWSP for local workers. Now, with this new obligation, does the government have a monitoring mechanism to ensure all employers comply with the obligation to contribute? We face the reality that there are still employers who smuggle foreign workers illegally through middlemen. If this problem is not resolved first, this bill may only benefit foreign workers who work legally, and provide no protection to the far larger group of undocumented foreign workers.

So, I would like to know: what is the government's strategy to ensure employer compliance? What level of enforcement will the government promise? And what firm action will be taken against companies that fail to contribute? We also cannot deny that this measure will increase operating costs for companies that rely on foreign labour. The plantation, construction and manufacturing sectors will be directly affected. How will the government ensure that these costs are absorbed, in the context of this industry, so that their cost burden is not shifted to the people as end consumers, which we are certainly worried will burden them with higher costs? Tan Sri Mr Speaker, with one and a half minutes remaining, I want to remind myself and everyone that Members of Parliament are also workers for their respective people. At the end of this session, I want to extend Selamat Hari Raya and Salam Ramadan, and we are also certain that after this session ends, we will return to work with our respective people. What distinguishes us, the opposition, from the government is that government Members of Parliament have allocations to give to the people who need them, but we have no allocations at all, Tan Sri Mr Speaker. Yet the poor people in our constituencies are just the same as the poor people in your constituencies. When government Members of Parliament return to their respective people, they can distribute allocations, but we cannot do the same. So, I hope that in the blessed month of Ramadan, Tan Sri Mr Speaker, the hearts of the Most Honourable Prime Minister and the government front bench will be opened so that allocations can be given to us, the opposition Members of Parliament. I think the government is already stable enough, with the stability that already exists. Two-thirds is already there to amend the Constitution. So, there is no need for any MOU...

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Pasir Mas, may I interrupt?

Sila, sila.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Only, according to news coverage, it was indeed requested to begin negotiations for a committee. What are the developments on that side so far?

If we are talking about negotiations, Petaling Jaya, I see that Muar has also said he has negotiated, has done all kinds of things. That is why Muar ― well, never mind, he is creative. He has a package. He can "bela" and defend his people... [Laughter] Never mind. But if I were a product model, I think the product would become less and less marketable... [Laughter] So, there is no other way.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

I think it would sell even better, Pasir Mas. Even better.

Just kidding. But I want to say that regarding negotiations, if we look at Muar, he has said he has negotiated and has done all kinds of things, yet he still did not get anything. So, on this matter of negotiations, I cannot answer on behalf of

Perikatan Nasional. But if negotiation were a condition for being given this allocation, I think the path can be reopened. However, what we have seen recently is that the Deputy Prime Minister (TPM) said a committee would be formed and so on; this time it seems to be dragged out, prolonging this matter. So, this atmosphere needs to be harmonised. What is most important, God willing, is that I hope this Ramadan opens a new episode for us, the opposition Members of Parliament. Thank you, Tan Sri Mr Speaker. That wide smile is a good sign. Thank you.

Mr SpeakerEN

Alright. I invite Mas Gading.

Tuan Mordi anak BimolDAP · PHMas GadingEN

Thank you, Tan Sri Speaker. Salam sejahtera and salam MADANI to all. The amendment to the KWSP Act is a right and fitting step and should be supported. Requiring non-citizen workers to contribute to the KWSP is not merely about ensuring justice in the social protection system, but also shows the maturity and sincerity of the MADANI Government in managing the workforce more responsibly. This policy is also in line with international standards and will strengthen Malaysia's position as a country that guarantees the welfare of all workers regardless of citizenship. However, there are also those who question the extent to which it will affect local employment opportunities, increase employers' costs, and what the long-term implications are for the national economy and the welfare of local workers. Tan Sri Speaker, first is from the perspective of the competitiveness of local workers. The employer contribution for foreign workers is two percent, compared with 12 to 13 percent for local workers. This situation has the potential to reduce employment opportunities for local workers, where this contribution system has made local workers less competitive in the eyes of employers simply because foreign workers are cheaper. Besides that, is the two percent share for foreign workers sufficient? For example, if they only work for two years with a minimum wage of RM1,700 a month, they will only receive about RM1,700 in total. Is this amount adequate or in line with the current cost of living? Mas Gading would like to propose that the foreign workers' share or contribution be increased somewhat so that they receive a greater return when they return to their countries later. Therefore, Mas Gading would like to propose for consideration in a future amendment to increase the contribution rate for foreign workers in stages after the implementation of this amendment. For example, in the first to second year, two percent from the employer, two percent from the worker. From the third year to

Tuan Mordi anak BimolDAP · PHMas GadingEN

the fifth year, five percent from the employer, five percent from the worker. From the sixth year onward, eight percent from the employer and eight percent from the worker. This proposed measure can ensure that employers do not see foreign workers as a far cheaper alternative, thereby maintaining the competitiveness of local workers, and a situation like this would encourage employers to avoid hiring foreign workers lawfully because they want to avoid paying the KWSP, thereby increasing the number of undocumented workers in Malaysia. Tan Sri Speaker, the second question that arises is how these foreign workers will access their savings when they return to their countries later. So, this bill is still unclear about the procedure for withdrawing KWSP savings for foreign workers who have completed their contracts or returned to their home countries. If there is no clear mechanism, we are concerned that there may be a large outflow of cash when these foreign workers withdraw all their savings at once.

Tuan Mordi anak BimolDAP · PHMas GadingEN

Therefore, it will affect the stability of the KWSP fund and, in turn, our national economy. Hence, Mas Gading's recommendation is to establish a staged withdrawal structure for foreign workers as follows. 50 percent of savings may be withdrawn immediately after they leave our country, and the remaining 50 percent is paid in instalments over a period of one to three years, to ensure this cash outflow is controlled and does not affect the economy. Before concluding my debate, I want to raise a few more questions. What is the effect of this bill on foreign workers who have previously contributed at the rate of 11 percent? Are they given the freedom to maintain the 11 percent rate? Second, how long can the contributor's heirs claim the savings of a foreign worker who has passed away? Third, how will the KWSP increase its efforts to raise awareness among employers and, more importantly, among foreign workers regarding this amendment later, especially for remote and rural areas? [Dato' Indera Mohd Shahar bin Abdullah (Paya Besar) chairing the sitting] This amendment to the KWSP Bill is a good step in extending social protection to non-citizen workers. However, several matters need to be refined so that the policy introduced does not disrupt the ecosystem of the workforce in our country. Thus, it is important that the KWSP ensures transparency in the savings withdrawal system and strengthens enforcement against employers who fail to contribute. Taking into account all these shortcomings, Mas Gading respectfully supports this amendment. Thank you.

Thank you, Honourable Mas Gading. Please, the Honourable Member for Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Assalamualaikum warahmatullahi wabarakatuh. Dato' Mr Speaker, thank you for giving me the opportunity to take part in the debate on the Employees Provident Fund (Amendment) Bill 2025. For the information of Dato' Mr Speaker, I have been a KWSP contributor since I was 24 years old. Alhamdulillah, I have received so many benefits because of the existence of the KWSP Act, which requires employers and employees to contribute for retirement savings. Apart from retirement savings, many other benefits are obtained from these savings, such as reducing housing loans, financing education fees for oneself or one's children, financing critical medical costs and many more benefits before reaching old age. Therefore, for a long time, I have never doubted the credibility and capability of the KWSP to add value and provide returns to contributors. Recently, the KWSP distributed RM73.24 billion in the form of dividends to contributors, 6.3 percent for conventional savings and 6.3 percent for syariah savings. Dato' Mr Speaker, on behalf of all contributors and myself, I wish to express the highest appreciation to the KWSP staff, to the Ministry of Finance, and to the MADANI Government for approving the dividend for the year 2024.. [Applause] The highest since 2017. I have a little more savings, Dato' Mr Speaker. Alhamdulillah. I feel like adding more, not just saving. I want to add more because of the returns we are confident in, given the capability of the KWSP. Therefore, I am surprised. Why are there parties who question it? They say, why give contributors such a high rate, almost to the maximum of gross investment income? I do not understand. If it is given, it is wrong; if it is a loss, it is also wrong. Nothing is right. But when do we hear that the KWSP is making a loss? Normally, in any business or investment, it is not put in one basket. There are many. Some may gain a little, some may lose a little, gain a lot and so on. But we must know that what the KWSP does is actually to provide returns and provide a form of security for contributors, for workers. This also includes foreign workers, as this Act which we are debating today provides. However, I want to ask the government: how about the lower contribution from non-citizen workers, which is only two percent from the employer and two percent from the worker, can it balance between the economic needs

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

of the country and the welfare of local workers, and the concerns raised by Bagan just now are not without some truth. So, to what extent has the government held engagement with parties who may be affected by this Act, particularly the micro, small and medium enterprises (PMKS), which we know do not have large funds to add to the burden of employing the workers they need? I think, Dato' Mr Speaker, apart from that, how can we give assurance that the efforts we are making will not cause a shift from workers who were previously eligible, causing them to run away and become undocumented foreign workers? Perhaps, on the contrary, if this method is carried out correctly, with cooperation from the Ministry of Home Affairs (KDN), we can actually attract these PATI undocumented migrants to work lawfully, because there is the guarantee of the Employees Provident Fund that is mandatory for employers and also for these workers. I think that is all for now, Dato' Mr Speaker. Dato' Mr Speaker, I wish you a happy fasting. Ramadan Karim. Thank you.

Thank you, Honourable Shah Alam. Please, the Honourable Member for Machang.

Thank you, Mr Speaker, for the opportunity to take part in debating the amendment to the Rang Undang-undang Kumpulan Wang Simpanan Pekerja that makes the two per cent contribution by foreign workers compulsory. I stand here on this auspicious day to express my full support for this amendment, because it brings benefits not only to foreign workers, but also to the nation's economy and to overall social welfare. Firstly, we know that with this compulsory contribution, we can guarantee the welfare of foreign workers. We must acknowledge and recognise that the 2.5 million foreign workers in Malaysia are also nation builders. Although they come from different countries, different religions and different races, it is their hands and their strength that have built our country. We know that in uplifting the status and dignity of foreign workers, they too are human beings, and we know that in every muamalah between the government, workers and employers, there is blessing. If we look, Mr Speaker, these foreign workers, most of whom come from Muslim countries, yes. In terms of honesty, it cannot be denied that there are bad apples. Even in a bunch of bananas, some are rotten. But, generally, if we look at their practices, those who are steadfast in performing their prayers and so on, I think it is because of this that our country has developed well. The blessings of the prayers of these people, these mustadh'afin, are what have developed our country.

So, it is right that the government and all of us approve this amendment, because it will further increase not only the economic value but also the blessings in our country's economic life. This cannot be quantified with economic model, with permission. This matter is spiritual. Insya-Allah, for those who believe, and I am confident that, as Muslims, we believe in blessings. Secondly, the benefit is that we improve transparency and social justice. We know that exploitation of foreign labour is rampant, with permission, in many countries, especially in our country. So, with this compulsory contribution, I am confident that it can, to some extent, reduce such problems.

Of course, among the other benefits is that we can strengthen the EPF fund for the interest of the nation. We know there is a considerable outflow of capital. If these foreign workers, if they― these people are frugal and if we have contributions saved within our country, at least that capital can be channelled into our local economy while they work here. Fourthly, it will certainly help reduce the financial burden on the government. At present, should an emergency or incident involving foreign workers occur, the government has to provide assistance using public funds. With EPF savings, foreign workers have access to their own savings, thereby reducing dependence on public funds and enabling the government to channel resources to those who need them more. Of course, among the other benefits is that foreign investor confidence can also be enhanced. When we have a robust social protection system, where social justice is guaranteed not only for local workers but also for foreign workers, whom we see sometimes being protested against by employers, mistreated, not paid wages and so on. Because of these weaknesses, it is the oppressors who ultimately cause our country's economy to be viewed unfavourably by foreign investors. Of course, among the other benefits is the promotion of better human resource management. So, Mr Speaker, I, as an Opposition Member of Parliament, am not here to protest or oppose everything. Good things I support. This I fully support. There is no opposition at all. So, please do not say on that side that we are not objective. Supposedly we are unable to tell which is a diamond and which is glass. When something is good, we say it is good; when something is right, we say it is right; when something is wrong, we criticise it. As for the sale of MAHB shares by the EPF, to us it is wrong, sold cheaply and bought dearly. This we oppose. We want the PAC to recall all those involved. So, do not obstruct the Opposition from doing its job. We support what is good. Whoever sits behind the Chinese wall, we want to know too, in the PAC later.

So, Mr Speaker, in this blessed month, and although Raya is still some time away, I extend greetings of selamat berpuasa, selamat menunaikan ibadah, and I urge everyone to recite the al-Quran more. Insya-Allah, I pray that this amendment will succeed. May blessings come to our country and justice for all contributors, whether local or foreign workers, and may Malaysia become baldatun thayyibatun wa rabbun ghafur. Assalamualaikum, Ramadan greetings. Thank you. See you in the next sitting.

Thank you, the Honourable Member for Machang. The last debater is the Honourable Member for Seputeh.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Okay, okay. Thank you. Yes, thank you, Dato' Yang di-Pertua. I will just respond briefly, yes. Machang, thank you for helping me just now. Actually, the PAC and I were also together with the Speaker in the Special Select Committee on Finance and Economy. We have heard all the explanations and reasons from the EPF, from MAHB, from Khazanah, from the Ministry of Finance. We are all clear about the issue raised by Machang; Machang just wants to play politics and keeps repeating issues about MAHB together with Ayer Hitam. Please, this is the month of Ramadan; you must speak the truth and be correct, okay.

[Laughter] Honourable Member, withdraw, Honourable Member, Standing Order 36(6). [Laughter] I am not playing politics, Honourable Member. I think there is still much that has not been investigated. MAVCOM has not yet summoned anyone. So, I know the PAC has not finished its investigation. Never mind, I will let the PAC investigate first. I do not want to comment further.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Thank you. Okay, Mr Speaker, I welcome the amendment to the EPF Act requiring employers to pay EPF contributions for foreign workers. This amendment shows that the government is concerned about all workers, including foreign workers, who have made many sacrifices and contributions in many sectors in our country. They are people who work in the 3D sector, namely difficult, dirty and dangerous. These foreign workers have helped our country lower the inflation rate and cost of living. Mr Speaker, Malaysia is always attacked by IWO and foreign NGOs claiming that foreign workers in our country are not treated fairly or well, or are even abused. The increase in the minimum wage for domestic workers and foreign workers to RM1,700 is a good policy. Imposing a two per cent EPF contribution on employers and foreign workers is also a good step that can answer all the attacks from the ILO and also foreign workers' NGOs. Mr Speaker, one of the problems faced by employers who hire foreign workers is that they abscond. Foreign workers abscond after working for several months or even several years in the country

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Ours. There are also syndicates that come to poach foreign workers who have work permits by offering slightly higher wages elsewhere. This is what causes many foreign workers to abscond. In addition, some foreign workers whose employment contracts have ended are forced to abscond because they really have no savings, as they have to repay debts to agents or loan sharks in their home countries and also to the agencies that brought them to work in Malaysia. Some of them do not have money to pay for an air ticket to return to their home countries. So, they have no choice but to run away from their employers after their employment contracts end and work illegally in our country. I think that EPF contributions for foreign workers can prevent foreign workers from absconding and can also prevent syndicates from stealing or kidnapping newly arrived foreign workers in Malaysia. This is because the EPF contribution system for foreign workers helps foreign workers save money in a forced manner. For example, if a foreign worker's monthly salary is RM2,000, then the combined monthly EPF contribution from the employer and the foreign worker is RM80; one year of contributions is RM960. So, if he works for three years, the total EPF contribution is RM2,880. If we add the EPF dividends, he can get over RM3,000 three years later. So, when their employment ends, say after three years in Malaysia, their savings in the EPF enable them to finance the cost of their flight and expenses to return to their home countries. In my view, foreign workers should be allowed or encouraged to contribute more and not just two per cent, because EPF dividends are higher compared with the interest rates on savings in local banks. So, Mr Speaker, I do not agree with section 70E in this amendment, namely that foreign workers can only withdraw all or part of the amount in their EPF accounts when the worker reaches the age of 55. Why can foreign workers only withdraw their contributions at age 55? Most foreign workers who work in our country stay only a few years or at most 10 years, according to our law. We should allow them to withdraw their EPF contributions before or after they leave Malaysia and return to their home countries. That is to say, they can withdraw their money when they show this air ticket home to Bangladesh, home to Indonesia, home to Myanmar, and then the EPF can release the total savings of their contributions in the EPF. This can overcome the problem of many foreign workers absconding, and their EPF savings are for them to finance their expenses to return to their home countries. So, if a foreign worker who

Puan Teresa Kok Suh SimDAP · PHSeputehEN

works in Malaysia at the age of 20, he can only be in Malaysia for 10 years. So, that means he must leave Malaysia at the age of 30.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

So, he has to wait another 15 years, how much? 20 – he has to, I wait, what, not 10, 15 years, 25 years. When he reaches the age of 55, only then can he get his EPF contributions. Actually, this is very impractical. When he is in Bangladesh, in Pakistan, in Myanmar, how can he contact the EPF to get his money back? So, I would like to propose that the government review section 70E of this amendment so that it becomes more flexible, so that as long as foreign workers return to their home countries and end their service contracts, they should be encouraged, in my view encouraged, to withdraw all their contributions from the EPF. That is all, thank you.

Thank you, the Honourable Member for Seputeh. Please, Honourable Member, respond for 15 minutes.

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

In the name of Allah, the Most Gracious, the Most Merciful, peace be upon you and the mercy and blessings of Allah. Salam Malaysia MADANI. Mr Speaker, first of all, I would like to take this opportunity to record my deepest appreciation to all the Honourable Members who took part in the debate at the policy stage of the Employees Provident Fund (Amendment) Bill 2025. On the whole, I observed the strong support received from all debaters. However, there were also views and proposals put forward, which we will carefully study and consider appropriately. A total of eight Honourable Members debated and expressed views, comments and proposals regarding this Bill, among them the Honourable Member for Bagan, the Honourable Member for Jerlun, the Honourable Member for Tawau, the Honourable Member for Pasir Mas, the Honourable Member for Mas Gading, the Honourable Member for Shah Alam, the Honourable Member for Machang and the Honourable Member for Seputeh. Based on the issues debated, allow me to respond to several key matters raised. Firstly, it must be emphasised here that every initiative proposed by the MADANI Government is aimed at protecting the welfare and well-being of the people, in line with the MADANI Economic Framework. The initiative to expand mandatory EPF coverage to non-citizen workers is in line with the government's efforts to narrow the equity gap between local workers and non-citizen workers, so that all workers in Malaysia, regardless of citizenship, receive social protection. The Honourable Member for Bagan touched on Singapore's decision to stop CPF contributions for foreign workers in their country. For the information of this House, Singapore and Malaysia have different needs and dependence on foreign labour due to different factors such as economic and demographic structures.

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

Although Singapore has decided not to allow non-citizen workers of Singapore to join the CPF Scheme, there are more than 70 countries around the world that provide mandatory retirement income protection to all workers regardless of citizenship, as follows. Countries that have provident fund schemes such as India, Hong Kong and Australia. Two ASEAN countries such as Indonesia, Cambodia and Thailand. Developing countries such as Libya, Tunisia and Brazil, and OECD countries such as Germany, the United Kingdom and France. In addition, countries with high dependence on non-citizen workers such as Bahrain at 78 per cent and Oman at 77 per cent are also moving towards providing retirement protection to non-citizen workers. The proposal to make contributions compulsory for non-citizen workers is intended to benefit the people and the nation, because it will improve the national wage structure. With this increase in wages, households will have a greater capacity to spend, thereby helping to generate the nation's economic growth. Therefore, the policy to mandate social protection for non-citizen workers is in line with international best practice. The Honourable Member for Pasir Mas also touched on support for economic growth through industrial transition towards Industrial Revolution 4.0, where mandating EPF contributions will indirectly reduce dependence on non-citizen labour in the long term, thereby increasing the competitiveness of local businesses, which encourages businesses to move towards automation. Dependence on non-citizen workers has the potential to constrain technological adaptation, hinder Malaysia's industrial transition towards Industrial Revolution 4.0, and contribute to the process of deindustrialisation among local companies. The paper, with permission, low-skilled foreign workers distortions to the economy, produced by Bank Negara Malaysia, found that the level of industry dependence on non-citizen workers has a strong correlation with that industry's level of productivity. If there were no EPF contributions for these non-citizen workers, the cost of hiring non-citizen workers would be cheaper than local workers. Therefore, this initiative is important to avoid the imbalance that exists in encouraging the employment of local people. In addition, it will also help the government reduce the number of undocumented non-citizen workers. Only workers who are legally registered with employers are eligible to contribute to the EPF. As for non-citizen workers, mandatory EPF contributions are an incentive that can be withdrawn when they return to their home countries, not only when they reach the age of 55, provided their work permit has expired and there is proof of permanent termination of employment.

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

Honourable Member for Bagan, Honourable Member for Tawau and Honourable Member for Shah Alam have raised issues relating to the engagement sessions and the various stakeholders that have been actively carried out to ensure that the policy formulated is holistic, taking into account all views and inputs from the parties involved. For the information of the Honourable Member, the Ministry of Finance and the Employees Provident Fund (KWSP) have held engagement sessions with stakeholders including relevant ministries, agencies, government bodies and employer and industry associations to obtain feedback on the implementation of KWSP contributions for these non-citizen workers. Among the matters discussed were the contribution rate, the method of implementation and the implementation timeline. In principle, the majority of stakeholders have expressed their support for the proposal for mandatory KWSP coverage for non-citizen workers, taking into account the objectives and benefits of implementing this proposal. So as not to burden employers, the Government, on 3 February 2025, announced that the employer's share of contributions will be set at 2 per cent and the employee's share at 2 per cent. This contribution rate is lower than the mandatory contributions set for Malaysian citizen workers and permanent residents, which are 11 per cent for the employee's share and 12 or 13 per cent for the employer's share. This is to ensure that the increase in costs to employers is controlled and structured, and at the same time reduces sudden economic shocks. Several Honourable Members have touched on equality of wages and treatment between non-citizen workers and citizen workers. Among them were the Honourable Member for Bagan, the Honourable Member for Tawau and the Honourable Member for Mas Gading. As announced by the Honourable Prime Minister during the 2025 Budget speech, the main objective of the proposal to require all non-citizen workers to contribute to KWSP is in line with the Government's efforts to narrow the equality gap between local workers and non-citizen workers, so that all workers in Malaysia, regardless of citizenship, receive equivalent social protection. At present, non-citizen workers are given the option to join the KWSP Scheme through the concept of, with permission, 'once in, always in'. The contribution rate set is 11 per cent of the monthly wage for the employee's share and only RM5 for the employer's share.

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

As of December 2024, only 22,635 or 0.9 per cent of the 2.5 million non-citizen workers chose to contribute actively to KWSP. The difference in the employer's contribution rate also contributes to the situation where the wage cost for non-citizen workers is lower than that for local workers. [Mr Speaker in the Chair]

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

Based on data from the Department of Statistics Malaysia (DOSM) as of December 2024, 14.4 per cent of the national labour force consists of non-citizen workers, who are mostly concentrated in unskilled or semi-skilled work. Dependence on non-citizen workers can contribute to low demand for local workforce resources. A study on school-to-work transition service, with permission, published by Khazanah Research Institute in 2019 found that four out of 10 Malaysian youths were of the view that they have to compete with non-citizen workers to obtain low-skilled jobs. So, if the gap is that employers have clear options, they will choose whichever is even cheaper. So, with the amendment of this Act, this will encourage more people to consider employing local citizens. Based on DOSM data for 2023, the median wage for non-citizen workers is RM1,529 a month, which is only RM29.00 higher than the minimum wage, in 2023. The 2018 Bank Negara Malaysia Study Report shows that the willingness of non-citizen workers to be paid low wages in the industry will lead to a phenomenon of wage suppression, with permission. This means wages will be pulled downward because there is an option that gives employers the choice of an even cheaper alternative. This will also oppress Malaysian workers, our own people whom we are supposed to look after. Therefore, the implementation of mandatory KWSP contributions for non-citizen workers is expected to encourage employers to hire more local workers and strengthen the wage structure of local workers towards the national aspiration of achieving a high-income nation. This also contributes to increasing domestic private consumption, with permission, domestic private consumption. The Honourable Member for Mas Gading has raised the matter of the outflow of money from the country if this provision is enforced. The majority of non-citizen workers have higher disposable income, since they do not need to contribute to KWSP. This is one of the factors contributing to outflows or remittances, at a rate of RM34.2 billion in official money transfers per year. This rate can directly put pressure on the value of the Malaysian Ringgit as well as the country's balance of payments. With the implementation of this policy, part of the income of non-citizen workers will be channelled into their KWSP accounts for their retirement savings, and this will directly help curb some of the money sent abroad by non-citizen workers. I thank the Honourable Member for Tawau for the ideas given earlier and also those received earlier, where KWSP also uses the funds received to invest in the domestic economy. So, this also provides good returns for the country. Tan Sri Mr Speaker, the Honourable Member for Jerlun and the Honourable Member for Mas Gading have touched on the mechanism for implementation and the determination of the contribution rate

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)EN

KWSP to non-citizen workers. Taking into account the feedback submitted by various stakeholders, this proposal will be implemented through a gentle approach, or soft approach. With the determination of a contribution rate of two per cent each for the employer and the employee, which is lower than the contributions of local workers. In relation to the income of non-citizen workers, KWSP is drafting the implementation of registration in an integrated manner with the databases of relevant government agencies, particularly the Immigration Department of Malaysia, for the purpose of identity verification and automatic registration of non-citizen workers, and with banks to verify accurate bank account information of non-citizen workers. KWSP will also expand online registration channels through the employer i-Akaun and self-service terminals to address the expected increase in the number of members due to KWSP. Tan Sri Mr Speaker, I have a little time left.

Mr Speaker

Silakan.

The contribution rate set at two per cent for the employer's share and two per cent for the employee's share will be maintained until notified by the Government should there be any changes in future. This is to ensure that the increase in costs to employers is controlled and structured, and at the same time reduces the risk of sudden economic shocks. Overall, this initiative is not expected to have a significant impact on the smooth operation and the stability of the KWSP system. KWSP is actively improving the readiness of its operations and systems so that implementers in the future will be efficient and smooth. The Honourable Member for Jerlun also raised the matter of why section 2 is not taken and only Part 7A is amended. For the information of the Honourable Member, Part 7A applies specifically to non-citizen workers, where this amendment is made for the purpose of clarity, because workers who have a country of domicile outside Malaysia, who work in Malaysia and hold a work permit, have been required to contribute and no longer have the option to contribute to KWSP. The date for the contribution to take effect is proposed for its implementation. We expect KWSP to implement this scheme starting from the fourth quarter of 2025. Before I close, there is also one issue raised earlier for those who are currently contributing as foreign workers. They may request to maintain their contributions at the rate they are currently making. If they contribute 11 per cent, they may maintain it at 11 per cent, without having to reduce it to two per cent. That is a concession that already exists in KWSP. Tan Sri Mr Speaker, in concluding this winding-up, I am pleased once again to record my appreciation and thanks for the views and inputs shared by the Honourable Members throughout the debate on this Bill.

Indeed, the inputs and views given are greatly appreciated and will be duly considered. This Bill is important for implementing the proposal to expand mandatory KWSP coverage to non-citizen workers in line with the Budget 2025 initiative, which aims to improve equivalent social protection between Malaysian citizen workers and non-citizen workers in the labour market. Therefore, there is a need for this Bill to be passed so that the Budget 2025 initiative for these non-citizen workers can be implemented this year, and its implementation plan can be undertaken after Act 452 is amended. Thank you, I thank everyone who has debated and all the proposals received. I take this opportunity because this is the last day of the Dewan Rakyat, to wish everyone a happy fasting month and, God willing, Selamat Hari Raya Aidilfitri to all. Thank you. [Applause]

Mr SpeakerEN

Honourable Members, I now put the question to the House for decision. The question is that this Bill be read a second time now. [Question put and agreed to] [Bill read a second time and committed to the Committee of the whole House] [The House resolved itself into Committee] [Mr Speaker in the Chair of the Committee] [Clauses put to the Committee] [Clauses 1 to 11 ordered to stand part of the Bill]

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Tan Sri Mr Speaker.

Mr ChairmanEN

Oh, please. Sorry.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Tan Sri Mr Speaker. Oh, Chairman.

Mr Chairman

Ya.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Tan Sri Chairman, I just want to refer to page five. This is under the description at number seven, regarding Clause 6, which aims to amend section 70E of Act 452. So, I will read. Subclause 6(a) aims to exempt a non-citizen worker of Malaysia from making voluntary contributions under subsection 43(8) of Act 452. Furthermore, subclause 6(b) aims to allow non-citizen workers of Malaysia to withdraw all or part of the amount in their credit when the worker reaches the age of 55 under section 55A of Act 452.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

So, this is what I presented in my speech earlier, where I said I do not agree, because a young foreign worker, when he comes at the age of 20, when he has to go back after 10 years, at the age of 30, then he has to wait another 25 years until the age of 55 to withdraw his money from KWSP. I just want to draw this to the attention of the Honourable Minister of Finance II so that, if it does not involve—it is only a description—perhaps this can be amended a little. But if it involves the provisions of this Bill, it may need further amendment. Thank you.

Mr ChairmanEN

Okay. Do you want to take Kota Melaka first, or answer first?

Datuk Seri Amir Hamzah AzizanMinister of Finance (II)

Kota Melaka.

Mr Chairman

Kota Melaka.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Tan Sri Chairman. I refer to Clause 10(b) on the contribution rate based on the amount of wages for that month by the employer, two per cent of the amount of wages for that month. Tan Sri Chairman, if we look at what is being done now, non-citizen workers pay 11 per cent for the employee's share, while for the employer's share it is RM5 per person. So, first of all, I want to stress that we support the government's intention as stated by the Minister of Finance II, this is for the benefit of workers and also employers, because we know that in future, if we do not harmonise, then that is a form of discrimination. Perhaps the goods we want to export abroad may not be exportable, which is for the good of employers. I understand that. So, given that this year we have raised the minimum wage from RM1,500 to RM1,700. That has already become a cost burden to employers. So, can the Government or the Ministry of Finance consider deferring the two per cent for employers, and we continue with what currently exists, which is RM5 for employers. Perhaps for six months or next year, then we can start with two per cent paid by employers. That is what I ask, that the Minister considers giving a little time for employers to adjust themselves. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Alright. Please, Minister. Any more? None. Okay.

Thank you, Honourable Members. Tan Sri Mr Speaker, regarding the question from the Honourable Member for Seputeh earlier. We must remember that what we are bringing to the House today is an amendment to the existing Act. In the existing Act, we also already have non-citizen contributors, who have a provision that allows them to make withdrawals. In the withdrawals that are allowed at present, just like Malaysian citizens if they have incapacity, death and so on, they can withdraw in full, and for those who are non-citizens of Malaysia, under the existing provision, when they have permanently left Malaysia, they can

also withdraw. So, that issue does not arise because there is already a provision in the existing Act. What we are doing is only to clarify that for those who reach the age of 55, this Act will also apply to them for withdrawals at the age of 55 if they are still in Malaysia.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Tan Sri, if possible I would like some clarification. From the Minister's answer just now, it appears that this amendment, or the contribution to EPF for these foreign workers, has departed from the objective of the Employees Provident Fund Act, which is savings for old age. If these workers can take back their money when they leave our country, that is not the objective of this Act. So, my proposal is, there is a major problem with foreign workers in Malaysia. If we want to look after their welfare, it would be better if we use this contribution to purchase health insurance or medical insurance for them. Because from experience, Malaysians can go to government hospitals and pay only a few Ringgit for treatment. But if foreign workers are injured or ill, and they go to a clinic or government hospital, they sometimes have to pay thousands of Ringgit to be treated, because they are charged at a rate, with permission, we call the usual medical bill. Unlike Malaysians, we pay only RM5 as a token, whereby the Government provides medical protection of about 95 per cent. Can we use it? I propose that if the Government can change the purpose of this contribution to look after welfare in terms of medical care. Thank you.

Mr Chairman

Sila, Menteri.

Thank you, Honourable Member. As I presented earlier, there are several issues that we have addressed. We must note that at present, non-citizens can contribute to KWSP but on a voluntary basis. So, the Act does already have a provision allowing withdrawals. So, we do not intend to withdraw what we have already provided from before and now. We are only making a clarification in section 70E that when they reach 55 years of age, they can also withdraw, the same as Malaysian citizens. That is the only amendment we are making in this Act. The objective of using KWSP contributions for other uses and issues on medical matters, perhaps it is better that we look at it in ways other than what is proposed here, because it requires a systematic review of healthcare provision in the country. At present, I think the Ministry of Health is still looking at how it will make a distinction between locals and foreigners and any adjustments it will make. So, I will leave it to the Ministry of Health to decide. Earlier, Kota Melaka asked, why not maintain RM5 and hold back the increase first? At present, we are holding to one basic policy, why do we want to impose two per cent? It is because we want to reduce the gap between foreign citizens and our citizens. Where, if we still allow them to contribute from employers at a small amount, non-citizens would have a discount and this will encourage the suppression of wages in this country. So, that is why we want to go straight to two per cent.

Our employers may contribute a small amount, non-citizens have a discount, and it will encourage wage suppression in this country. So, that is why we want to go to two per cent.

We must remember that when the proposal for this Bill was first put forward, employers initially thought that we would impose a rate of 13 per cent or 12 per cent. So, when the Most Honourable made the explanation on the 3rd of the month, stating that we set it at two per cent, I think employers have accepted that this rate is a reasonable one. Thank you.

Mr SpeakerEN

Alright, I repeat. [Clauses 1 to 11 ordered to stand part of the Bill] [Bill reported to the House now] [The House resumed sitting]

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Tan Sri Mr Speaker.

Mr SpeakerEN

Yes, Ayer Hitam.

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Standing Order 36(6).

Mr SpeakerEN

How much, Ayer Hitam?

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

36(6). Assuming bad faith.

Mr Speaker

36(6).

Datuk Seri Ir. Dr. Wee Ka SiongMCA · BNAyer HitamEN

Earlier, at 4.12 p.m., the Honourable Member for Seputeh mentioned my name together with Machang. I ask him to apologise and withdraw it, because it is not fair to me. Just now I received a letter from the Speaker stating that I had been referred under Standing Order 36(12), but there was no prima facie case. So what he said is unfair to me. I support this Bill. No issue. But please do not suddenly mention my name. It is not fair to me. Thank you.

Mr SpeakerEN

Alright. I was not presiding at that time and I did not hear it. So, it would be unfair for me to make a decision now. I will check the Hansard again and, God willing, at the next meeting we will take action. Alright. Thank you, Ayer Hitam. Minister, please proceed. [The Bill was reported without amendment; read a third time, supported by the Deputy Minister of Finance (Puan Lim Hui Ying) and passed]

Mr SpeakerEN

Alright, Honourable Member. Before we adjourn, I have a few matters I would like to mention here.

Mr SpeakerEN

[Laughter] Firstly, World Women's Day, which will be celebrated on 8 March 2025, honours the roles and contributions of women ― nobody challenge it, okay ― and recognises the challenges that still remain in achieving gender equality, especially in leadership and policy-making. As the Chair of AIPA this year, Malaysia continues to support the role of women in political and social representation through the Gathering of ASEAN Women Parliamentarians (WAIPA), to enhance the participation and representation of women in the Parliaments of ASEAN countries and in decision-making at the regional level. Happy Women's Day. May women continue to be given opportunities and space to contribute... [Applause] To speak up and lead in every field, especially in Parliament... [Applause] Honourable Members, the First Meeting of the Fourth Session of the Fifteenth Parliament took place over 18 days, from Monday, 3 February 2025 to Thursday, that is today, 6 March 2025. This first meeting saw the Dewan Rakyat pass the Motion of Thanks for the Royal Address, 10 laws, and several motions, including a motion to debate the Auditor General's Report 1/2025. In addition, three ministerial statements were delivered in this House. At this meeting, we witnessed a new milestone for this legislative institution when the Rang Undang-undang Perkhidmatan Parlimen 2025 was passed... [Applause] Honourable Members, this year, under the legislative pillar, the Parliament of Malaysia is the Chair of the ASEAN Inter-Parliamentary Assembly (AIPA). The Parliament of Malaysia will be directly involved in five programmes, namely: (i) Meeting of Women AIPA; (ii) Meeting of Young Parliamentarians; (iii) ASEAN-AIPA Leaders' Interface Meeting; (iv) The Seventh Meeting of AIPA Advisory Counsil on Dangerous Drugs; and (v) the 46th ASEAN Inter-Parliamentary Assembly (AIPA) General Assembly. Honourable Members, I and my deputies extend our heartfelt thanks to all Honourable Members who have given good cooperation to enable the meetings to be carried out smoothly throughout this sitting period. I also do not forget to extend my appreciation and thanks to all government officers... [Applause] Staff of the Parliament of Malaysia... [Applause] Especially the Dewan Rakyat Management Division... [Applause] Members of the media and all parties who were involved directly or indirectly in managing the Meeting's affairs during this sitting of the House. I wish everyone a safe return and a safe arrival at their respective destinations. May Honourable Members always be in good health together with their beloved families.

Mr SpeakerEN

In closing, I take this opportunity to wish you a blessed fast for the remainder of this month of Ramadan and a happy Hari Raya Aidilfitri... [Applause] Honourable Members, the House is adjourned today until a date to be determined. Assalamualaikum warahmatullahi wabarakatuh, and see you again.

[The House was adjourned at 5.49 p.m.]

Special ChamberSpecial Chamber

[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Issue of Street Light Maintenance in SabahSpecial Chamber

Datuk Lo Su FuiPBS · GRSTawauEN

Thank you, Mr Speaker. Thank you also to the Honourable Deputy Minister of Works (KKR), Datuk Seri. Today I stand here to voice the grave concern of the people of Sabah regarding the issue of dark federal roads caused by weak maintenance of federal road lighting. In 2023, an allocation of RM5 million was disbursed for the maintenance and installation of street lights in Sabah, and in 2024 this allocation was increased to RM9 million.

Although there has been an increase, this amount is still insufficient. Sabah is facing a backlog, with permission, of maintenance, with the cost of maintaining each street light around RM3,000, replacing feeder pillars, with permission, that are damaged or stolen, which reach RM20,000 each, and underground cables aged 30 years that need to be replaced. In Tawau alone, there are nearly 2,000 federal road lights that require an estimated budget of around RM5 million to ensure the street lights function properly.

Mr Speaker, road accidents caused by the absence or damage of street lights are increasing and becoming a serious threat to the safety of the people of Sabah. Based on reports from the Road Transport Department (JPJ) Sabah, more than 5,000 accident cases were recorded in 2023, with at least 20 per cent of them occurring in areas lacking road lighting. The situation is worse on the Tawau airport road to the Semporna–Tawau Checkpoint, a distance of 15 kilometres, which has had no street lights at all since the road was opened. Almost every week there are accidents, especially at night in dark areas. This is an issue involving lives and safety, and we cannot compromise on this matter.

Therefore, I wish to urge the Ministry of Works (KKR) to give a more serious commitment in resolving this problem. An allocation of at least RM50 million is needed to address the street lighting issue in

Datuk Lo Su FuiPBS · GRSTawauEN

the whole of Sabah holistically. This amount is reasonable when compared with the actual needs and the risks faced by the people of Sabah every day.

With sufficient allocation, we can significantly reduce the risk of road accidents and improve the safety of road users.

Mr Speaker, I also propose that the concession for street light maintenance be returned to the Sabah State Government. Performance records show that the Sabah State Government, through the Public Works Department (JKR) Sabah, is more efficient in managing the maintenance of road infrastructure.

By handing this responsibility to the Sabah Government, we can ensure that the use of allocations is more transparent, effective, and gives maximum impact to the people.

As the Member of Parliament for Tawau, I hope the ministry can consider this matter promptly. This problem involves not only infrastructure but also matters of safety, well-being, and the lives of the people of Sabah. That is all, thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister to reply.

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

Mr Speaker, thank you to the Honourable Member for Tawau.

This ministry takes great concern over the issue of road safety, particularly on federal roads throughout the country, not only in Sabah.

This ministry, through the Road Safety Infrastructure Upgrading Programme 2024, has implemented a scope of installing street lights at locations where accidents occur or that are at risk of accidents due to dark roads. For this scope, locations frequently experiencing accidents or at risk of accidents, such as junctions, bends, bridges, and areas with a history of accidents, will be identified, and street light installation will be carried out locally, not for the purpose of lighting along the entire road.

In 2024, a total of RM30 million was spent on installing street lights at 277 selected locations on federal roads throughout Malaysia. Based on records from 2023 to 2024, 39 federal road locations in the state of Sabah have been fitted with street lights under the street light installation scope as well as at black spots due to dark roads. In 2025, RM21 million has been allocated for the installation of street lights at 212 selected federal road locations throughout Malaysia, and of that amount, RM2.2 million has been allocated for 22 federal road locations in the state of Sabah.

Based on this ministry's review with the JKR Negeri Sabah, it was found that the Tawau Airport Road to the Semporna–Tawau Checkpoint referred to by the Honourable Member is located on Federal Route 13, Sandakan–Tawau Road, from CH224.90 to CH244.74, a distance of 20 kilometres.

To date, 252 street lights have been provided along that route, including at Bulatan Sungai Burong, Bulatan Nasib Kita, and the Balung area.

Based on the priority location list submitted by JKR Negeri Sabah, the route raised by the Honourable Member has been allocated an additional RM100,000 for 2025 for the installation of new street lights

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

and the scope of work involves the installation of six new street lights and must be completed in the current year.

This ministry takes note of the issue raised by the Honourable Member regarding the lack of road lighting on the Tawau Airport Road to the Semporna-Tawau Checkpoint located on Federal Route 13. We will consider the additional installation of street lights at the said location on safety grounds if the set criteria are met. The Ministry of Works (KKR), together with the Public Works Department (JKR), is always committed to ensuring that the condition of roads remains in a safe state.

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

The ministry also takes note of the proposal to address the issue of street lights throughout Sabah that was raised. Therefore, we propose that the Honourable Member submit the proposed project to the State UPEN and the State JKR to be included in the list of state priority projects under the Rolling Plan of the Thirteenth Malaysia Plan (RMKe-13) that is forthcoming.

Dato' Dr. Mr Speaker, for the maintenance aspect of the existing street light system, areas with junctions such as roundabouts at Bulatan Sungai Burong, Bulatan Nasib Kita, and the main settlement area of Balung require maintenance costs of about RM2 million for comprehensive repairs, especially the replacement of aging underground cables. At the same time, immediate repairs such as replacing bulbs or small components will be carried out if damage occurs and based on the available allocation.

For street light maintenance work in the Tawau district, this ministry, through JKR Sabah, has spent RM1.3 million in 2024, which restored the function of street lights at several critical black spot locations. For 2025, this ministry has disbursed RM9 million to JKR Sabah to maintain federal street lights and traffic lights for JKR Sabah. An allocation of RM1 million will be made for repairs to street lights focusing on the road from Tawau Airport to the Tawau town area.

New street lights using a solar system will also be installed at junctions that require good lighting. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member to ask a question.

Datuk Lo Su FuiPBS · GRSTawauEN

Thank you, Dato' Mr Speaker. Thank you for the reply from the Honourable Deputy Minister.

Mr Speaker, this is the seventh sitting in this session term of this Parliament. So, every time I feel there is a question, the same issue, including this time, this is the second time I have entered this Special Chamber. So, I thank you for accepting the issues that I have raised.

So, for the information of Mr Speaker, and also for the information of the Honourable Minister, I will give one example. In 2023, RM5 million in allocation was disbursed to Sabah, and Tawau received RM1 million. With this RM1 million we were only able to repair less than one kilometre of street lights in the Tawau area. From four kilometres to five kilometres, it is all finished. This

Datuk Lo Su FuiPBS · GRSTawauEN

means the problem is far from our road. The cables are aged, and all this is a problem that has been in backlog for six years.

So, for me, the solution is very simple, Honourable Member. JKR Sabah's estimate is that we need RM50 million to repair the street lights throughout Sabah. But Honourable Member, I understand that if there are financial constraints, perhaps out of every 10 street lights, we could light up two or three, because Sabah is not like KL.

Sabah has many village areas where there are no buildings at all along the road. It is pitch dark, unlike KK, Sandakan, and Tawau, where in the towns there is still light from the roadside. So, I hope KKR will take this into consideration.

So, for me Mr Speaker, what I or the Sabah State Government receive almost every day are those images of accidents, those that end in death or serious injury. For me, I get scolded every day too in Tawau. Tawau is one of the worst areas for this street light problem. But I did not feel afraid to get it. But I felt sad because we, as representatives of the people, cannot even defend this safety or these lives threatened by these risks on the road.

That is all, Honourable Member. I think this is the ninth time I have followed up on this issue. I think KKR has fully understood. So, I hope there will be the best step in the near future and this problem will be resolved.

Thank you.

Dato' Dr. Mr Speaker, yes, we fully understand everything that the Honourable Member has said. So, I want to read out the approvals that we have given to the Tawau district for street light maintenance.

Before I entered this ministry in 2022, it was only RM96,290. In 2023, only RM62,000. Since I came into this ministry, in 2024 it was RM1.3 million. That is a big difference, it is far apart. In 2025, RM1 million. For the state of Sabah, previously in 2022 for maintenance of street lights and traffic lights on the federal roads of the state of Sabah, in 2022 it was only RM1.7 million. In 2023 it was only RM1.4 million. But in 2024, RM9.7 million.

From RM1 million, Dato' Mr Speaker, it became RM9.7 million. In 2025, RM9 million.

The total is RM21.805 million. The Honourable Member mentioned RM50 million is needed. So far it is RM21 million. This is not even halfway, for reasons of our allocations, as you know.

But I want to repeat here that according to the MIROS study of the Ministry of Transport, there are three main causes of accidents.

The smallest percentage, seven per cent, is vehicle condition. Vehicles that are not serviced, the brakes do not work well, perhaps the vehicle's signal lights that may have been old for a long time. Seven per cent of accidents are caused by vehicle condition.

13 per cent is caused by road conditions. That is our responsibility. Road conditions, corners, then black spots. That is 13 per cent road conditions. But 80 per cent of the causes of accidents are due to carelessness on the part of the drivers, yes. The carelessness of drivers, whether motorcycle drivers, car drivers, bus drivers, or lorry drivers. Their carelessness. So, if we say that we need as many lights as possible, it will not solve the accident problem, Dato' Mr Speaker.

But we take into account that when we build any road, there is certainly no lighting in the BQ and also in the tender for lighting the whole road. What we have is only at roundabouts, at junctions, at U-turns, and if we think that those places will become black spots and so on. Corners and so on, only those places are what we include in the BQ and also in the tender for installing street lights.

So that is it, Dato' Mr Speaker. Happy fasting.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Baik.

This is the last day of this Ramadan Special Chamber. Thank you, YB Tawau.

Datuk Lo Su FuiPBS · GRSTawauEN

Thank you, YB.

The Honourable Member for Tawau.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please proceed, Honourable Member.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Flood Issue in TawauSpecial Chamber

Datuk Lo Su FuiPBS · GRSTawauEN

Thank you, Mr Speaker, thank you, YB. Mr Speaker, I wish to draw the attention of the House to the critical issue that has long plagued the people of Tawau, Sabah, namely the recurring flood problem in Bandar Tawau.

The floods that occur more than four times a year threaten the safety of more than 500,000 residents, damage infrastructure, and affect the local economy. For example, in 2023, areas such as Kampung Rawa-Rawa, Batu 4, Batu 2 Apas, Sin On, and Tanjung Batu Keramat were hit by flash floods, forcing hundreds of families to move to temporary relief centres.

To overcome this problem, I urge the ministry to expedite the implementation of the Tawau Basin, Sungai Tawau, Sabah Flood Mitigation Plan Project (Phase 1B). This project is important to protect affected areas from future flood disasters. Among the main measures is enlarging the mouth of Sungai Kinabutan Kecil and the mouth of Sungai Tawau to increase the river's capacity to accommodate high water flow during heavy rain. Enlarging the river along four kilometres from Kampung Titingan to safer areas is also critical.

The installation of water gates or tidal gates is important to control the flow of water and reduce the risk of flooding.

In addition, I want to emphasise the importance of improving the diversion drainage system of Sungai Tawau through Kampung Pasir Putih and Kampung Kukusan to the sea. This is a strategic measure to ensure flood water can be channelled efficiently without threatening residential areas.

At the same time, the allocation for the construction of a new bridge on Jalan Apas Batu 2, which is listed in the Flood Mitigation Plan Phase 1A Project, also needs immediate attention. The existing bridge cannot be used after the river widening works are fully implemented, causing serious logistical problems if not addressed.

Datuk Lo Su FuiPBS · GRSTawauEN

I stress that this flood issue is not merely a local issue but involves the economic security and well-being of the people as a whole.

Therefore, the ministry needs to give a clear commitment and immediate action to realise the projects that have been planned. Close cooperation between the Federal and State Governments is the key to success in tackling the flood issue in Tawau. By expediting the implementation of the Tawau Basin Flood Mitigation Plan Project (Phase 1B), we can not only reduce the risk of disaster but also improve the quality of life of the affected residents. I hope the ministry can act promptly for the sake of the people of Tawau. That is all, thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

Thank you, Dato' Mr Speaker.

Firstly, thank you for the concern of the Honourable Member for Tawau regarding the flood issue in Tawau. For the information of the Honourable Member, the Flood Mitigation Plan (RTB) Project for Sungai Tawau, Tawau River Basin, Sabah (Phase 1A) with a total cost of RM27.5 million was completed in February 2024. Through the implementation of this project, the 900-metre stretch of the Sungai Tawau in the downstream, or with permission, downstream, has been upgraded through river widening and dredging works, including the construction of bank protection structures and walkways.

For the information of the Honourable Member, the work of upgrading the mouth of Sungai Tawau has been carried out in this project. The Ministry of Energy Transition and Water Transformation (PETRA), through the Drainage and Irrigation Department (JPS), has also submitted an application for cost increase approval to carry out the construction of the Sungai Apas Bridge, which had previously been removed from the original contract due to land acquisition issues. Therefore, subject to approval, this project is expected to be re-tendered in October or newly tendered in August 2025, and the bridge construction work is expected to be completed within a period of 30 months.

PETRA, through JPS, has also listed the Sungai Tawau Flood Mitigation Plan Phase 1B project under the First Rolling Plan application of the Thirteenth Malaysia Plan with an estimated cost of RM132 million. The main scope of Phase 1B is to upgrade Sungai Tawau along 2.3 kilometres starting from the outlet, or with permission, outlet, Sungai Tanjung to Sungai Rakis via the Sungai Apas Bridge. For the information of the Honourable Member, the project scope will also involve river upgrading works along four kilometres starting from Kampung Titingan to the critical areas that have been identified. Based on the initial design, Phase 1B will in future reduce the flood risk for 19,500 residents affected by floods covering an area of 600 hectares.

In addition, PETRA, through JPS, has also applied for a project to conserve the mouth of Sungai Kinabutan Kecil under the RP1 of RMKe-13 with an estimated cost of RM80 million. For the information of the Honourable Member, the proposal to upgrade the diversion of Sungai Tawau through Kampung Pasir Putih and Kampung

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

Kukusan to the sea has also been applied for implementation in 2026, under RMKe-13, using state government allocation. This one is under the Sabah State Government with a total cost of RM10 million. The main scope of the project is the upgrading works of the Sungai Tawau diversion to increase the water flow capacity to overcome the flood problem.

As a short-term solution to ensure the drainage functions well, PETRA, through JPS, carries out small works under the River Conservation Project to Reduce Flood Risk. An allocation totalling RM1.54 million has been disbursed for the Tawau Parliamentary constituency from 2022 to 2024 to carry out eight projects with main scopes such as river channelling, stabilising river banks, and upgrading drains and related structures. This year, RM300,000 has been allocated to carry out one quotation work. That is all, thank you, Dato' Mr Speaker.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Member's question.

Datuk Lo Su FuiPBS · GRSTawauEN

Thank you, Mr Speaker. For the information of the Honourable Deputy Minister, Tawau is the hub of the east coast of Sabah. What happens in Tawau will have an impact and effect on other areas with a population of more than one million people. For this reason, I request the government's consideration to give special attention to this issue. What additional and proactive steps have been taken by the government to reduce the impact of flooding in areas such as Kampung Rawa-Rawa, Batu 4, Batu 2 Apas and Sin On, where the situation is getting worse? The floods that have hit these areas not only cause losses of thousands of ringgit to residents but also threaten their safety.

Whenever there is heavy rain, this area is often struck by flash floods that paralyse residents' daily activities. In this situation, what short-term, medium-term and long-term plans have been prepared to overcome the flood problem in Tawau? Next, what specific plans does the government have to enlarge the mouth of the Sungai Kinabutan Kecil and the mouth of the Sungai Tawau to increase the flow capacity of the river in an effort to solve the flood problem, which is occurring more and more frequently? Both of these river mouths have long been identified as critical areas requiring immediate attention because the non-smooth flow of water causes major floods and causes losses of millions of ringgit to the affected residents nearby.

In addition, does the government intend to implement the construction of tidal gates or water gates, with permission, at risky river areas as one of the measures to reduce the flood threat in Tawau?

This measure can prevent sea water from entering land areas at high tide and thus reduce the risk of flooding. What is the timeframe for this project to be completed, and what other measures are being considered to reduce the impact of flooding in Tawau? Thank you.

Thank you, Dato' Yang di-Pertua. Thank you to the Honourable Member for Tawau. In order to understand, or when I examine the case that occurred in Tawau, the flood mitigation project involving the Sungai Tawau, which is the main basin there, was planned. The government's planning at that time divided the project into four packages. The third and fourth packages that I mentioned just now are under Phase 1A. However, even for the package or Phase 1A, we face constraints, for example, as mentioned earlier, for the construction of the bridge, there is an issue of land acquisition.

So, for example, when we tried to implement the project in 2020, the land acquisition involving 10 lots began to face problems in June 2020.

So, because this problem stems from objections and so on. Because we have to manage people and also local residents while the government's aim is to solve a bigger problem. Therefore, for Package 1A, we had to remove the bridge construction component so that the mouth works could be completed first. So when I re-examine the diagram...

[While showing a sheet of paper] We are now only doing work nearby, at the tail end, downstream, while the four-kilometre flood mitigation plan has not yet started. Therefore, in terms of planning at the ministry level, we indeed intend to table this Phase 1B in the RMKe-13. I am sure that as a people's representative, we will receive feedback from the public.

The area may be affected or there are proposals that have been put forward.

But at the same time, once it has the design of the project— although some of the components that I mentioned earlier have been completed, as long as the whole is not yet finished, the effect is still not perfect. So, our challenge is to ensure that the planning for this Phase 1B is not merely tabled by our ministry but also obtains approval for the funds to be continued.

Then, in terms of the proposals of the Honourable Member just now, for example the water gates and so on. For me, we listen to the feedback from the Honourable Member, but the Department of Irrigation and Drainage (JPS) will decide whether those matters need to be included in the scope of work or so on. However, the assurance I received from the department is that the planning, design and everything else have been carried out, and if there is a need based on what happened recently, we will look into it.

But if not, the intention is more toward the four-kilometre stretch, which we must complete because that is the main trunk or main river flow route for the Sungai Tawau, and which we must ensure together so that there will be good news in the RMKe-13 later. Thank you, Dato' Yang di-Pertua.

The Honourable Member for the Rantau Panjang constituency.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Terima kasih.

Yes. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Mr Speaker, for giving me the opportunity to present a motion on the need for an immediate solution to the flood problem in Rantau Panjang and a review of the river flow systems in Rantau Panjang.

Mr Speaker, first of all, I extend my thanks to Mr Speaker for the opportunity given, and thank the Right Honourable Prime Minister for his concern about the flood issue in Rantau Panjang. The issue that arises is that the flood problem in Rantau Panjang has not yet been resolved, and in fact the flood situation is getting bigger and more severe.

I also urge the ministry to review the river flow systems in Rantau Panjang. There are proposals to create new river channels to reduce the pressure on existing rivers which are the cause of major floods. I understand that the Department of Irrigation and Drainage (JPS) has conducted a study on this proposal to reduce the flood risk.

Therefore, I request an explanation on the current status of the latest study, and also that the existing mitigation structures need to be improved because they are still ineffective and fail to control the floods. I hope that immediate action from the government and ministry can be implemented so that national funds are not wasted and residents are not threatened and are safe.

So, I would like to express my highest appreciation to the government and ministry for their concern and efforts in addressing the flood issue in Rantau Panjang. I hope the measures taken can resolve the flood problem promptly for the welfare and safety of all the people. That concludes my speech, thank you, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please proceed, Honourable Minister.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Need for an immediate solution to flooding in Rantau Panjang and a review of the river flow systems in Rantau PanjangSpecial Chamber

Dato’ Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Thank you, Dato' Yang di-Pertua. Thank you to the Honourable Member for Rantau Panjang, who has raised the issue of the floods in Rantau Panjang as the current situation has explained.

The Honourable Member also stated at the beginning that the Right Honourable Prime Minister is indeed one of the matters to which he has given very special attention, namely the flood problem in Rantau Panjang. Moreover, last week we also had the opportunity to hear an explanation from the Right Honourable Prime Minister in the House when the issue of floods in general was raised.

But there are also details relating to the Sungai Golok.

So, for the matter raised here, the Ministry of Energy Transition and Water Transformation (PETRA) through the Department of Irrigation and Drainage (JPS), we have completed the Sungai Golok Study, or what is called (KESBAN) (Security and Development), with permission, Flood Protection Scheme in 2010. Based on that, there was also the Proposed Sungai Golok (KESBAN) Flood Scheme Phase 1, phase 1 in 2020.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

So, as a result of this, both studies were developed based on flood models and hydraulic studies and analysed the flood problems across the entire Sungai Golok basin to produce detailed designs. All three phases of the Sungai Golok Integrated River Basin Development (PLSB) were implemented based on the recommendations and proposals of these studies, taking into account the overall flow of the Sungai Golok.

As a measure to reduce flood risk, especially in the Rantau Panjang Parliamentary constituency, PETRA through JPS is implementing the Sungai Golok Integrated River Basin Development (PLSB) through three phases. If I understand correctly, when I entered the ministry, why three phases? The reason is finance. We want to manage it so that one is completed, and once one is finished, we manage the funds for the next.

But for the current phase, Phase 1 of the Sungai Golok PLSB involves the district of Tumpat and part of Pasir Mas. This project is currently being implemented and the latest progress at the site is 70 per cent. According to the schedule, this project is expected to be completed fully in 2026. That is what has been stated so far, in July.

Phase 2, on the other hand, involves the districts of Jeli, Rantau Panjang and part of Pasir Mas. This is what the Right Honourable Prime Minister mentioned when he said we want to expedite it, so this project is currently in the procurement process.

Based on the plan, physical work is expected to begin in July 2025 and be fully completed in 2030. That means we do not wait for Phase 1 to be completed; we have already started the work for this second phase.

Phase 3, on the other hand, the Sungai Golok PLSB involves the districts of Tumpat, Pasir Mas, Jeli and Rantau Panjang. This phase is implemented on a design-and-build basis and will complement the first and second phases. The project began in April 2024, last year we started. The latest progress is 4.2 per cent and, according to the schedule, the project is expected to be fully completed by 2029.

The Federal Government has also set up a Special Coordination Committee for the Sungai Golok PLSB chaired by the Chief Secretary to the Government to monitor implementation and develop strategies to accelerate project implementation for enhancing the well-being of the people. This committee is also joined by the Ministry of Finance, the Ministry of Economy, the National Security Council, the Implementation Coordination Unit, the Federal Director General of Lands and Mines Department (JKPTG) and the Kelantan State Land and Mines Office.

PETRA has collaborated with the state government and JKPTG as a proactive action to accelerate the completion work of the Sungai Golok PLSB.

Through this cooperation, JKPTG and the state government have given their commitment. The Honourable Member for Tambun also stated this in the House last week when he met the Honourable Menteri Besar, where the state government agreed that the land acquisition process, which previously took 24 months, will be completed within six months. That is the commitment given by the state government.

To expedite construction, changes will be made to the materials and construction methods from earth-bank construction to flood walls (floodwall). Several proposals have also been identified to reduce

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

the current flood impact until the project is completed, using the control-at-source approach. But before that, for the information of the House, as the Honourable Member for Rantau Panjang raised, when we build phase one, it does save the Tumpat area, but its effect is on Rantau Panjang. So, that is why we understand when the Honourable Member often speaks out, asking when it will be completed, when it will be completed. The project is only starting, but when the project begins, its effect is more severe or worse on the Rantau Panjang area, because what is built protects the Tumpat area first. Because our way, we build through phases, but now we are trying to carry out everything at once.

However, while we wait for the project to be completed, there are three approaches that we have studied, which we have tried to find ways to help the situation there, namely, first, increase the capacity of the Sungai Lemal Lanchang. I hope I have said it correctly, Lemal Lanchang. By carrying out river deepening works. So, that river, which lies between Tumpat and Rantau Panjang.

Second, there we have also identified a pond called Danau To'Uban. Until now, that pond has been used for agricultural purposes. So, that pond has never been disturbed or has had no other purpose. However, when we re-examine, our proposal is to coordinate the operation of the Danau To'Uban pond during the Northeast Monsoon.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

That is, the proposal is that when the Northeast Monsoon is near, meaning the pond needs to be lowered slightly to make preparations to accommodate the flow of water during the monsoon. So, this does not actually require additional costs, but is to coordinate the operation of the Danau To'Uban pond. And third, another method that we have considered, especially for places that may be affected by floods, is the installation of temporary flood-retaining structures to reduce the impact while these projects are being built.

For the short-term solution to ensure that drainage functions properly, PETRA through JPS is also carrying out small works under the River Conservation Project to Reduce Flood Risk. An allocation totalling RM959 has been channelled to the Rantau Panjang Parliamentary constituency from 2022 to 2024 to carry out 16 projects with main scopes such as river channelisation, stabilising river banks and upgrading drains and related structures. This year, RM160,000 has been allocated to carry out six quotation works. That concludes my speech, thank you, Dato' Yang di-Pertua.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

The Honourable Member, your question.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. I sincerely thank the government for its concern and thank the Right Honourable Prime Minister for his serious attention, especially on the issue in Rantau Panjang. In fact, the people of Rantau Panjang have long suffered and borne losses due to the floods. Just let phase one be the one we bear.

Until now, the people say, Mr Speaker, that the embankment is a cursed embankment. I have been scolded and cursed by the people many times.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

So, the issue now is that the solution with the existing structures does not solve the problem; in fact the flood is getting bigger, reaching above the roof level of the water. Never in history has the water been that deep in Rantau Panjang. The latest one is the fourth flood in a short time. The last one just now was smaller, but before that the water was very deep. So, the issue now is that I would like, if possible, to request the ministry to urgently consider bypassing the river flow at the early point so that at least two river flows go to the Sungai Meranti.

We do not want— if it is only one, I think it will not be resolved, because we are not only facing water from the river— from the Sungai Lemal and from the Sungai Lanchang. We are also facing water from the Sungai Kemahang and Sungai Garu. We are also facing water from Thailand flowing into the Sungai Golok and overflowing directly into the town of Rantau Panjang. Six months a year, the economy is paralysed in the town of Rantau Panjang. The people suffer. The town is almost dead. There is nothing left. So now, what the government is doing does not solve the problem, although I know the government is trying its very best, but the existing structures do not solve the problem. In fact, it is getting worse.

So, I hope the solution will be expedited, namely by diverting the flow of water in several river channels. Perhaps one river is not enough, maybe two rivers, three rivers are needed at the early source, and do something about how to deepen the Sungai Golok as well. Perhaps it can be negotiated through G2G because I know that river is a border river between two countries. They also face floods, and we also face floods. That river has not been improved for 50 years, so it should be deepened at the— so that the water flow can be channelled further so that the source causing such huge water can be channelled directly to the sea. I humbly request the consideration of the ministry.

Dato' Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

The Honourable Minister.

Dato' Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Thank you, Dato' Yang di-Pertua. Thank you to the Honourable Member. When a disaster occurs, the impact falls on local residents, which is why, when we re-examine the implementation of this project, it is indeed phased. Phase one, two, three. So, if last year, if the Right Honourable Prime Minister, when we re-examine, had not stepped in or intervened, and had just allowed this project to proceed as planned, Rantau Panjang would indeed have suffered until everything was completed one by one.

In fact, when phase one is completed, Rantau Panjang suffers even more, as the Honourable Member mentioned. So, for that matter, indeed, the commitment given by the Honourable Member is that if this phase two is not moved forward, phase one will protect only the area on the Tumpat side, but Rantau Panjang will be disrupted because it cuts right through the middle.

So, to say that this structure will make the situation worse overall, I think when everything is completed, God willing, the situation will improve. But that is our view that we cannot wait.

The Right Honourable Prime Minister gave instructions when he went to the ground, he checked for himself— although in terms of the reasons why we had to divide it into three phases before, due to financial issues and so on, the commitment of the Right Honourable Prime Minister is that we proceed because this is more important than monetary issues. That is why the Right Honourable Prime Minister

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat Menteri.

Terima kasih Dato' Yang di-Pertua. Terima kasih pada Yang Berhormat. Bila berlaku musibah, bila berlaku kesannya adalah kepada penduduk setempat yang mana sebab itu bila kita teliti balik dari segi pelaksanaan projek ini, bila disusun itu memang berfasa. Fasa satu, dua, tiga. Jadi, kalau sekiranya tahun lepas, kalau Yang Amat Berhormat Perdana Menteri bila kita teliti balik kalau beliau tidak masuk ataupun intervene, hanya membiarkan projek ini berjalan mengikut seperti mana yang dirancang memang sengsaralah Rantau Panjang sehinggalah selesai satu per satu.

Malah bila selesai fasa satu, Rantau Panjang makin sengsaralah seperti mana Yang Berhormat sebutkan. Jadi, untuk urusan tersebut memang komitmen yang diberikan Yang Berhormat memang kalau tidak ada fasa dua ini bergerak lagi memang fasa satu itu menyebabkan hanya kawasan sebelah Tumpat dilindungi tapi Rantau Panjang itu terganggu sebab dia memotong tengah-tengah.

Jadi, nak kata struktur ini akan menyebabkan keadaan bertambah buruk secara keseluruhannya, saya rasa bila selesai semua insya-Allah keadaan itu bertambah baik. Tapi itu yang pandangan kita tak boleh tunggu.

Yang Amat Berhormat Perdana Menteri bagi arahan bila beliau turun ke lapangan, dia semak sendiri— walaupun dari segi alasan kenapa kita terpaksa pecah tiga fasa sebelum ini kerana isu kewangan dan sebagainya, komitmen Yang Amat Berhormat Perdana Menteri tak apa kita jalan sebab ini lebih utama daripada isu wang ringgit. Sebab itu Yang Amat Berhormat Perdana Menteri

...commitment only in terms of what was mentioned, what I said earlier, that there are three methods for us to try to resolve this a little. The Danau To'Uban mentioned earlier, Danau To'Uban...

[While showing a sheet of paper] The dam or pond is located up here.

Dato' Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Yes. [Speaking without using the microphone]

So the hope is that before the water reaches Rantau Panjang, we want to hold it back here first during the monsoon rains. Until now, that pond has never had a function for flood purposes. So, it stores— the pond has indeed stored water for agriculture but has never been emptied. So this year, the Department of Irrigation and Drainage (JPS) has re-examined this so that this function becomes a dual function, beginning this year, that is, during the coming monsoon rains, we will empty a portion of it. So that it will provide space for the water to be stored when the rain falls and so on.

Second, when we mention enhancing the capacity of Sungai Lemal Lanchang. That river is actually located together with what was said earlier, the haunted one. What's it called?

Dato' Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Benteng puaka.

[Speaking without using the microphone]

That Benteng puaka. Because that embankment causes the water to be trapped in Rantau Panjang. The river there is getting more and more— so, our proposal is for us to dredge that river even though phase two of the work has not yet begun, this is what we want to expedite first. Because we cannot give the excuse of simply waiting for phase two, and only then will Rantau Panjang be resolved.

Because even if phase one is completed, Rantau Panjang will still face major challenges. Therefore, what we are doing is, we have looked at it in terms of cost, so we are prioritising deepening that river. Based on the discussion earlier, we are trying within eight, nine million, yes? RM9 million, which we have agreed to expedite. We will dredge that river first. Because otherwise, there will definitely be issues that keep recurring. We want to prevent that matter from getting worse.

As for Sungai Golok itself, as the Honourable Prime Minister gave his commitment in the House, at this time we want to use the advantage of good relations with our neighbouring country, especially when there are advisers and so on on the Thailand side. Indeed, one of the things discussed is how to deepen Sungai Golok. But this matter is— yes. When I try to understand the technicalities, what are the challenges. One, the border issue. Two, the issue of who will bear the cost and so on. But as for the commitment from the government, this matter definitely requires us to discuss with the Thai government to find a way to dredge and deepen Sungai Golok, especially at the estuary.

So, this matter really— if we go by internal discussions, this matter we need to coordinate with the Ministry of Foreign Affairs so that this also involves both countries. So, if there is any further question that I...

Dato' Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Yes. One more.

May I, Honourable Member?

Dato' Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

It is related to the river bypass. From Sungai Lemal, bringing that water to Sungai Meranti.

Okay. As for that, I— we are actually open, meaning if there is a need, when that matter is to be implemented, we will look at its effectiveness. According to the plan or design that we have made, this is based on ARI 50, meaning a 50-year flood, which we can accommodate.

However, here— in my view, this is when I study it. When looking at phase one, apart from technical challenges. Meaning, finding which river to connect and so on, among the issues we repeatedly face at Sungai Golok is the issue of land acquisition, Mr Speaker.

So, for the Honourable Member's information, as an example, its complexity is not only a technical matter, but, for instance, for phase one there are still some lots that we have not been able to resolve, these land lots. So, I am trying to imagine, when the Honourable Member's proposal is for us to build a bypass, meaning we would have to acquire new land and so on. Although when the Honourable Member put forward that matter, it seems like a bypass to solve the problem more quickly, my concern is that it will once again involve the land acquisition issue with village residents, a process which will also take a long time.

If we look at it from here, my understanding is that, apart from there still being land that needs to be managed by the land authority, mainly at the state level, I am informed there are also actual court cases that residents want to bring and so on. This will further delay the process. But in my view, this matter is the right of us as landowners. They have their view, but if the Honourable Member can help to ease or convince certain people to give cooperation, I believe when we enter phase two and phase three, the land issue will arise again, which is why the state government has given its commitment. Usually in Kelantan, we negotiate for two years. Din-dong, din-dong, over there it has been 24 months. The Honourable Prime Minister's commitment is tied to the Menteri Besar, and the Menteri Besar has also given a commitment of six months. This is where the Honourable Member can help us.

Because in my view, as long as the issue— although I reported earlier that phase one has 70 per cent progress, what is stuck now is the land acquisition issue. So, the six months, last week the MB of Kelantan gave a commitment. Hopefully this year it will be resolved by June, July. There should already be a way out for land acquisition. So, for phase two as well, if these land issues can be expedited, then for that reason, in terms of the expectation— when the Honourable Member for Tambun mentioned we want to expedite this project, our expectation for phase two, for example, is that the physical work can begin in July 2025 and be fully completed by 2030. So, at the very least, it can be completed faster than the initial expectation when it was designed, when we start this project. So, I hope that with good cooperation between the Federal Government, the state government, agencies, and also perhaps as Members of Parliament, we are truly affected by the complaints and appeals from the Honourable Member.

But the Honourable Member also understands that in these two years— two, three years, when the Honourable Prime Minister took on the responsibility of leading the nation, this is indeed one of the things we are striving for. It's not that we don't care, we are very affected when the Honourable Member says they are complaining and so on. The Honourable Member must help us explain these past two years

many efforts we have made to expedite the project at Sungai Golok. So, thank you, Dato' Speaker. Happy breaking of the fast.

The Honourable Member for Rantau Panjang.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Need for the construction of a new bridge from Kampung Mahligai to Kampung Rong Chenok that collapsed due to floodingSpecial Chamber

Dato’ Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Bismillahi Rahmani Rahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker, for allowing me to put forward my second motion, which is the need to build a new bridge from Kampung Mahligai to Kampung Rong Chenok, which collapsed due to floods.

Mr Speaker, I would like to record my appreciation to Mr Speaker for the opportunity given to debate this critical issue. The massive floods that struck the state of Kelantan in December 2024 had a major impact on residents, particularly in the Rantau Panjang area.

More than 30,000 families in the districts of Pasir Mas and Rantau Panjang were affected by the floods.

Among the urgent needs is the need for a new bridge to replace the bridge that collapsed due to the floods at Kampung Mahligai to Kampung Rong Chenok. This bridge is more than 60 years old, I am informed, and is the only main access for residents to go to school, to health centres, a route for earning a living, and the economy for local residents.

The absence of this bridge has caused residents to build a bamboo bridge which is very— I would say that bridge can be thrown away. It is very dangerous.

However, it is extremely dangerous, this bamboo bridge built over the water is not safe, especially for children who have to go to school and residents carrying out their daily activities. Therefore, I request that the Ministry of Rural and Regional Development (KKDW) expedite the construction of a new bridge with stronger and flood-resistant specifications. This bridge is estimated to be about 100 metres long, and its construction is very urgent to ensure the safety and well-being of residents.

I hope the ministry can give immediate attention to this issue. Thank you, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Datuk Hajah Rubiah binti WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Dato' Speaker. Thank you YB Rantau Panjang for this question.

Dato' Speaker, the Ministry of Rural and Regional Development (KKDW) has taken note of the urgent need to build a new bridge to replace the existing bridge that collapsed due to the major floods in December 2024. For the Honourable Member's information,

Datuk Hajah Rubiah binti WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

the ministry has received an application to build a new bridge at Kampung Rong Chenok, Rantau Panjang, Pasir Mas, Kelantan from the Kelantan State Office of the Ministry of Rural and Regional Development. Through a letter dated 3 February 2025, and this application refers to the bridge construction project raised by the Honourable Member.

Based on the initial observation by the KKDW Kelantan State Office during the site visit on 16 January 2025, the main factor causing the structural failure of the bridge was the accumulation of aquatic plants which had covered the entire surface of the river. When the river water level rose, the large and heavy accumulation of aquatic plants became trapped on the bridge's pillars and deck.

This then created excessive pressure on the structure of the bridge. The pressure generated by the accumulation of aquatic plants was added to by the pressure from the fast-flowing river current, which caused the structural failure of the bridge. The ministry takes note of the difficulties faced by village residents in carrying out daily activities such as sending children to school because they have to take a long alternative route. Earlier I calculated it to be around more than 30 kilometres, yes.

Therefore, the ministry has submitted an application to build a new bridge from Kampung Mahligai to Kampung Rong Chenok for consideration and approval by the Ministry of Economy to be implemented under the First Rolling Plan of the Thirteenth Malaysia Plan (RMKe-13). Thank you, Dato' Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member's supplementary question.

Dato’ Siti Zailah binti Mohd YusoffPAS · PNRantau PanjangEN

Thank you, Mr Speaker, thank you to the Honourable Deputy Minister for the ministry's concern in resolving the issue of the people in Kampung Mahligai and Kampung Rong Chenok.

My supplementary question is, what immediate measures and allocations have been provided by the government for the construction of a temporary bridge, because if the Honourable Member waits for a permanent bridge, it may take a long time. So, a temporary bridge from Kampung Mahligai to Kampung Rong Chenok is needed, including a timeframe for completion. Perhaps when it will start, when it will be completed, and how its design can withstand the thick grass as the Honourable Member mentioned earlier, and we see that its impact is very large, which is the social impact. They want to go tapping rubber, go to the clinic, all use that road bridge.

So, the absence of this bridge has caused a very large impact on residents. So, what are the monitoring mechanisms and the short-term and long-term plans to ensure that this infrastructure can be built, even in a temporary form, and that there is a permanent right so that this infrastructure is stronger and more durable? I request an explanation.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you, Mr Speaker.

For the Honourable Member's information, the ministry does not have detailed information on the immediate measures and allocations provided by the government at this time following the collapse of the Rong Chenok Bridge

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

yes. However, the ministry believes that action under National Security Council (MKN) Directive No. 20 has been activated to drive short-term immediate action involving state-level agencies, mainly JPS as the original owner of the bridge, and also JKR to provide an alternative route.

On the part of the KKDW ministry, we will give high priority so that this new bridge project can be approved under the Ministry of Economy, yes, under the First Rolling Plan (RP 1) of RMKe-13 for the year 2026. Because it is now 2025, the budget has already been settled. Meaning it has been approved and we have only just received the application for this project. This project has never been listed before.

So, God willing, if this project can be approved, the ministry will promptly appoint JPS as the implementing agency for this project, because it is understood that all the designs for the new bridge have been prepared by JPS Kelantan. As a technical department, the design of the bridge to be built will take into account the flood level and will minimise the bridge pillar structures in the river to reduce the risk of the same incident happening again, yes. As for the condition of the thick and long grass which was one of the causes of the bridge collapse, the cleaning work falls under the purview of JPS. That is all, thank you, Dato' Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. Before I close this Chamber, I will read out the adjournment speech for the Special Chamber.

Honourable Members, before I adjourn the Special Chamber sitting for this First Meeting of 2025, I would like to record my appreciation to all Honourable Members who have taken part in the Special Chamber sessions throughout this meeting. The Special Chamber for this First Meeting has seen a total of 65 Standing Order 17 motions involving 20 ministries debated in the Special Chamber over a period of 17 days.

In addition, one Standing Order 18 motion was debated and one Ministerial Statement session was held. This Special Chamber also gave the opportunity to four backbenchers and three Opposition Members to chair the Special Chamber sittings under Standing Order 16(5).

Honourable Members, with this, the Special Chamber sitting for this meeting has come to an end. The Special Chamber today is adjourned until a date to be determined. That is all, thank you.

[The Special Chamber was adjourned at 3.33 p.m.]