Dewan Rakyat · 7 October 2025

15th Parliament, session 4, meeting 3 · not final · 502 turns · 42,887 words · official PDF ↗ · Digital Hansard ↗

437 of 502 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Mr Speaker presiding over the Sitting]

(Opening)

Mr SpeakerEN

Assalamualaikum warahmatullahi taala wabarakatuh and good morning, salam sejahtera. Today, this morning, we were supposed to have the Ministers' Question Time, in which two questions were submitted by Paya Besar and also Masjid Tanah. However, I understand that the Prime Minister is unable to attend this morning because he has been summoned by the Conference of Rulers to be at Istana Negara at 10.00 a.m. Therefore, I invite the Minister to read the motion.

Motion — Amending Order of Business of the House under S.O. 14(2)Motion

Dato’ Seri Azalina Othman SaidUMNO · BNMinister in the Prime Minister's Department (Law and Institutional Reform) · PengerangEN

Mr Speaker, "Pursuant to Standing Order 14(2), I respectfully propose that the Ministers' Question Time be dispensed with and the Order of Business proceed now with the Question Time for Oral Answers, and thereafter resume with the business in today's Order Paper."

Mr SpeakerEN

Good. Thank you. Is there anyone who supports?

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

I respectfully support.

Mr SpeakerEN

Good. Thank you. Honourable Members, I now put the question to the House for decision. The question is that the motion as moved just now be agreed to.

[Motion moved for decision; and agreed to]

Mr Speaker

Setiausaha.

Oral QuestionsQuestions

Mr SpeakerEN

Good. We will begin today's questions earlier. However, for the information of Paya Besar and Masjid Tanah, who have submitted questions for the Ministers' Question Time to be answered by the Prime Minister, I will adjust them to another date without any need― no need to include these questions anymore, okay. Insya-Allah. Good. For that, I invite Tuan Mordi Bimol, Mas Gading. Please proceed.

Tuan Mordi anak BimolDAP · PHMas GadingEN

Thank you, Tan Sri Speaker. Mas Gading's Question number 1.

Mordi anak BimolDAP · PHMas Gading · questionEN

1. Tuan Mordi anak Bimol [Mas Gading] asks the Minister of Transport to state the comprehensive actions taken regarding the JPJ safety audit involving commercial vehicle operators: (a) the planning and audit schedule for approximately 300,000 companies as well as the total number that have been audited; and (b) a digitalisation plan for the safety audit process to accelerate the detection of non-compliance and reduce bureaucratic red tape.

Mr Speaker

Silakan, Menteri.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Thank you, Tan Sri Mr Speaker. Good morning, salam Malaysia MADANI, Honourable Members. For the information of Honourable Members, the implementation of the JPJ inspection and safety audit, also known as JISA― JPJ Inspection and Safety Audit, aims to monitor the level of compliance of commercial vehicle operating companies with the Industry Code of Practice, Industrial Code of Practice (ICOP) concerning safety aspects in the transport industry. The JISA audit covers five main elements, namely safety management, vehicle management, driver management, record management and risk management. Every operator is required to comply with seven mandatory matters under

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

the ICOP, including the appointment of a safety officer, installation and monitoring of GPS, compliance with driving and rest hours, provision of an emergency action plan, and provision of a company hotline number for public complaints. Based on records up to 30 April 2025, the total number of registered commercial vehicle operating companies is 48,002 companies, and not 300,000 companies as informed by the Honourable Member. This confusion may stem from the difference between the number of operating companies and the total number of licensed commercial vehicles, namely 372,586 buses and lorries under the regulation of the Land Public Transport Agency. So, there is a difference between the operating company licence and the vehicle permit. These are two different things. Up to 31 August 2025, JPJ has carried out 7,228 JISA audits throughout the country, covering various categories of operations. The implementation of these audits is a continuous step to ensure that industry compliance with safety standards continues to be enhanced, thereby supporting the efforts of MOT to significantly reduce the accident rate involving heavy vehicles in order to guarantee the safety of road users. Tan Sri Mr Speaker, for the information of Honourable Members, JPJ is implementing a digitalisation plan for the safety audit process through the development of a JISA digital system that enables the audit and monitoring modules to be carried out independently with verification and control mechanisms to ensure that the audit process is carried out transparently, efficiently and with integrity. This system is expected to be completed and will be used in 2027. Through the implementation of this system, data from Global Positioning System (GPS) devices will be integrated directly into the JISA database to enable the real-time detection of non-compliance, including activities such as driving over the speed limit, route deviation and operations outside permitted hours. This digitalisation step is expected to accelerate the detection of non-compliance, improve enforcement efficiency and reduce bureaucratic red tape, in line with the government's aspiration through MOT to accelerate digital transformation in the nation's transport sector. Thank you.

Mr SpeakerEN

Good. I invite Mas Gading.

Tuan Mordi anak BimolDAP · PHMas GadingEN

Thank you, Tan Sri Speaker. Thank you, the Honourable Minister, for the answer given. So, for

Tuan Mordi anak BimolDAP · PHMas GadingEN

the supplementary question, Mas Gading wishes to ask, how many companies have failed the JPJ safety audit and what actions have been taken against commercial vehicle operating companies? Thank you.

Mr SpeakerEN

Good. Please, Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you. These audit actions have already been intensified since last year. For information, from 2019 to 2025, up to August, 11 operator licences have been revoked, while 12 vehicle permits have been revoked. And the action we usually take when they fail the JISA audit is to suspend the operator's licence for a period. So far, 562 operator licences have been suspended and are undergoing the suspension process, and 56 vehicle permits have also been suspended, and 24 warnings have been issued.

Tuan Loke Siew FookDAP · PHSerembanEN

So, the total actions so far are 665, and we will continue to intensify these actions, especially this year when we have held special operations to monitor and also to audit randomly and by surprise, or we spot check, conducting these JISA audits so that they always comply with the rules that have been set. Thank you.

Mr SpeakerEN

Good, I invite Jerantut.

Bismillah, thank you to Tan Sri Mr Speaker, thank you to the Honourable Minister. Firstly, congratulations on implementing this JISA initiative or strategy, which is very welcome. However, according to a news link from BERNAMA TV, after one month, from 23 June until 31 July 2025, the JISA special operations found that more than 60 per cent of the 500 audited commercial vehicle companies failed to comply with safety requirements, where most of them did not install GPS systems in heavy vehicles even though it is mandatory under APAD. So, my question is, with this 60 per cent non-compliance rate, does the ministry acknowledge that this monitoring mechanism has failed to be enforced effectively? What immediate action will be taken to ensure that safety requirements are not merely on paper? Secondly, Minister, does this failure show that the commercial transport industry is now facing a high compliance cost problem? So, what form of assistance and also incentives can the government offer to ensure safety without burdening

small operators?

Mr Speaker

Baik, Menteri.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you to the Honourable Member. As mentioned earlier, the level of compliance among operating companies with the JISA audit is quite low. This may be because they feel that enforcement action was less serious in the past. From 2019 to 2022, these audits were indeed rarely conducted. During the COVID period, there was really none conducted at all. We only started in 2023 to be more aggressive, and last year JPJ was indeed more aggressive in carrying out enforcement. This year, of course, quite a lot have been conducted. So, I think a strong message has been sent by the Ministry of Transport, especially by JPJ, to these operating companies, and the action imposed is quite harsh on them, namely the suspension of their entire operator licence for a period if they do not comply with JISA. So, this message has been sent and I am confident that compliance with the JISA audit is now better. However, I would like to correct the Honourable Member. The Honourable Member keeps saying that the cost is higher. In fact, for JISA compliance, the cost is not high. It is only a rather nominal cost, for GPS for example. Nowadays there are companies that operate or offer GPS services on a subscription basis. So, one vehicle may cost RM50, RM60 a month, or just RM1, RM2 a day. So, GPS is very important because GPS will monitor the movement of the vehicle, whether they comply with the permitted speed limit and whether they drive the vehicle more than they should in areas they should not enter, and so on. So, monitoring through GPS is very important. Therefore, our challenge now is how to integrate GPS in vehicles with the systems in JPJ so that monitoring can be carried out more effectively. Now, of course, when there is an accident, we will request that their GPS be handed over to the authorities for us to study, whether they were driving over the speed limit. But if there is a system that can integrate this GPS into the JPJ system, then monitoring can be carried out

Tuan Loke Siew FookDAP · PHSerembanEN

at all times. So, I hope this can be publicised to the public so that awareness of this safety aspect must be implemented. So, I would like to urge Honourable Members not to give excuses to operating companies about additional costs and so on. There is indeed some additional cost. But this is a safety aspect that we need to implement and this is not a new requirement. It is a requirement that was already imposed when the operator licence was issued. So, they cannot say that now, because there are additional costs, they have not implemented it. They already know that this is a requirement when the operator licence was issued. Thank you.

Mr SpeakerEN

Good, thank you. Next, I invite Dato’ Suhaimi bin Abdullah, Langkawi.

Thank you, Tan Sri Mr Speaker. Not enough with one plus two, my second question.

Mohd Suhaimi bin AbdullahBERSATU · PNLangkawi · questionEN

2. Dato’ Haji Mohd Suhaimi bin Haji Abdullah [Langkawi] asks the Minister of Works to state the ministry's policy in ensuring the involvement of local contractors, especially from Langkawi, in construction and maintenance projects implemented by the ministry, including efforts to empower G1-G3 contractors.

Mr Speaker

Sila Menteri.

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

Ha, meeting a friend to get together, a true friend brings hope; On the second question, YB Langkawi, listen to the answer. For the information of Honourable Members, the Ministry of Works (KKR), through the National Construction Policy 2030, always ensures that the national construction industry ecosystem continues to develop inclusively by focusing on the involvement of local contractors, including small contractors of grades G1 to G4. To ensure this aspiration is achieved, the involvement of local contractors in construction and maintenance contracts is implemented based on Treasury Circular 2.21, the Government Procurement/Project Implementation Methods 2025, which applies everywhere, including in Langkawi.

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

For example, the Ministry of Works has implemented a programme to accelerate road maintenance by utilising G1 to G4 contractors. This programme aims to appoint contractors by balloting to carry out maintenance work nationwide through concession companies. This includes the implementation of balloting for small G1 and G4 contractors in Langkawi. I would like to inform that the total number of projects in Langkawi for all contractor classes from January 2025 to October 2025 is 76 projects, both private and government. Of the 76 projects, G3 has 11 projects, G4 three, G5 has five, G6 has two, G7 has 15. What I have mentioned are all obtained by contractors from Langkawi. Of the 76 projects, 36 projects were obtained by Langkawi contractors, or 47.4 per cent, nearly half of the projects were obtained by Langkawi contractors. I would also like to inform that G1 in Langkawi has 481 licences, G2 116, G3 35, G4 three, G5 five, G7 only has three, whereas many projects also involve G7. The total number of contractors in Langkawi is 643, whereas the work available is 76. Tan Sri Mr Speaker, there are more licences than work, that happens everywhere. Thank you.

Mr SpeakerEN

Good, I invite Langkawi.

Thank you, Tan Sri Mr Speaker. I want to read the question given by the Langkawi Bumiputera Contractors Association. For the information of the Honourable Minister, many projects from ICU are monopolised by politicians and other contractors become victims of commissions. What are the ways or mechanisms to eradicate this unhealthy culture of cronyism, and to request that all government agencies in Langkawi carry out work by balloting, including councils and so on? The second question from them, Honourable Minister, is to request raising the maximum value for G1 from RM200,000 to RM350,000 because construction costs have risen. Thank you, Tan Sri Mr Speaker.

Mr SpeakerEN

Good, thank you Langkawi. Although Langkawi read it out, I think those are Langkawi's questions, yes. Please, Minister.

[Bangun]

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

[Bangun]

Yes, so far, Tan Sri Mr Speaker, the limit for each contractor licence is as follows: G1 not more than RM200,000 contract, G2 not more than RM500,000, G3 not more than RM1 million, G4 not more than RM3 million, G5 not more than RM5 million, G6 not more than RM10 million and G7 no limit. That is the existing limit. If we want to raise that ceiling, that is something that needs to be examined. Government procurement requires several principles. Cronyism, politicians and so on, those are just accusations, but the principles of government procurement are, first, public accountability, second, transparency, third, the best value for the government with price and performing contractors, open and fair competition.

And we have also raised this balloting level. Previously, works of RM50,000 and below were balloted; now we have raised it from RM50,000 to RM100,000. Then recently, until the end of the year, works of RM200,000 and below can be balloted. Thank you.

Mr SpeakerEN

Good, I invite Tenggara.

Thank you, Tan Sri Speaker. I had intended to request an allocation from the Public Works Department (JKR) for Tenggara, thank you. I also request a thorough answer for the supplementary question. Tenggara's question: what is the total number of contractors nationwide according to the classes mentioned just now, and what steps have been taken by KKR to help improve the capacity of Class G1 to G4 contractors, who are considered small contractors. Thank you.

Mr Speaker

Baik. Menteri.

Basil flowers in a vase, Beautiful plants full of flora; Thank you for the supplementary question, This is the answer for YB Tenggara. So, yes. Question, yes. [Laughter] What are the steps for the government to help these G1 to G4 contractors? Among the steps, just now I briefly mentioned road maintenance. MOF, Ministry of Finance, for three consecutive years has given RM300 million in 2023, RM400 million in 2024, and this year RM450 million that can be used through balloting, and we have implemented this balloting for G1 and G4 contractors.

Next, we also have the contractor empowerment programme, ACE, 300 contractors received benefits. Then, we also have the teknopreneur skills programme, the TVET pathway for G1 and G3, only those with a bumi status certificate. Overseas, those who register overseas can also carry out work. I would like to inform that there are 139,662 contractors throughout Malaysia, and the largest numbers of contractors are G1 – 68,827, G2 – 23,755, G3 – 20,414, G4 – 6,040, G5 – 7,535, G6 – 1,974, G7 – 11,117. Total 139,662. Many of these contractors, we do not intend to freeze contractor registration, Tan Sri Speaker, because it would be unfair to new contractors, new people, TVET students whom we tell to carry out construction programmes but whom we do not give licences. That is why we do not intend to freeze licences, especially G1 will not be frozen. Thank you.

Mr SpeakerEN

Good, next I invite Dato’ Sri Doris Sophia.

Thank you, Tuan Yang di-Pertua. My question is number 3.

Doris Sophia anak BrodiPRS · GPSSri Aman · questionEN

3. Dato' Sri Doris Sophia anak Brodi [Sri Aman] asks the Minister of Home Affairs to state what are the weaknesses in enforcement that have led Malaysia to now be seen as a preferred destination for international scammer syndicates, including the latest case involving more than 400 people arrested at Bangsar South.

Mr Speaker

Silakan Menteri.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Thank you, Dato’ Mr Speaker. Thank you, Honourable Member. The Ministry of Home Affairs (KDN), through the Royal Malaysia Police (PDRM), takes online fraud crimes very seriously, which face various challenges, including syndicates with global application networks. Various initiatives and efforts have been mobilised by the government and enforcement agencies. However, there remain challenges that affect the effectiveness of action against these financial fraud crime syndicates. Among the key issues identified are weaknesses from the legal perspective, a shortage of expertise, and challenges in cross-border coordination and cooperation. One of the most critical issues is the mismatch between existing laws and the current reality of cybercrime. Many legal provisions are considered not sufficiently strict or are outdated, especially when facing increasingly sophisticated fraud tactics. More worryingly, there is not a single act

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

...the comprehensive framework specifically addressing cross-border cyber crime, causing many cases to fail to be prosecuted or to be dealt with thoroughly. In addition, the penalties imposed are sometimes too light, failing to provide an effective deterrent effect on offenders or other syndicates. Second, limitations in tactical and technical expertise and human resources among digital forensic teams and cyber enforcement personnel also pose a major obstacle. Many enforcement officers are still not sufficiently skilled in handling new technologies used by scammers, such as VPNs, spoofing and encrypted communication platforms. Furthermore, the national cyber monitoring and security infrastructure is still not on par with developed countries, making the detection of and response to digital threats rather slow and not comprehensive. Mr Speaker, to curb this increasingly rampant crime, the government has taken several measures as follows. Among them, amendments to legislation to address cyber crime cases. The government has amended the Penal Code Act 574 to address cyber crime cases, particularly financial fraud involving the use of mule accounts, with additional provisions, namely sections 424A, 424B, 424C and 424D, concerning the offences of possessing, controlling and using ATM cards, credit cards and any payment instruments. In addition, amendments to the Criminal Procedure Code Act 593 involve the addition of section 116D, which grants police officers the power to seize and freeze accounts to block financial transactions. Besides that, the government is also drafting a bill relating to cyber crime as part of efforts to eradicate cyber crime in this country. For the information of the House, with effect from 26 June 2025, the National Scam Response Center has been placed under the purview of the Ministry of Home Affairs (KDN) and is led by the Royal Malaysia Police (PDRM). The NSRC has been assigned the function of a one-stop centre operating 24 hours since July 2025 and providing end-to-end services to tackle online fraud crimes. The NSRC will also be strengthened with additional positions currently being refined by the Public Service Department (JPA), and a new one-stop centre that will operate at Menara 2 MCMC Cyberjaya. Given the increase in online fraud cases, the NSRC has become the frontline in providing a response to save victims' money.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

The NSRC was established through integrated collaboration among multiple agencies, combining the expertise of the Royal Malaysia Police (PDRM), Bank Negara Malaysia, the National Financial Crime Prevention Centre, the Malaysian Communications and Multimedia Commission (MCMC), as well as financial institutions and the telecommunications industry. Thank you, Tan Sri.

Mr SpeakerEN

Alright, I invite Sri Aman.

Thank you, Mr Speaker. Thank you to the Minister's side for the answer, which I feel is quite satisfactory. However, I see that if we look at the activities and tactics of international scammers today, they are increasingly cunning and increasingly bold. So, and this involves many foreign nationals. So, my question is, apart from the measures already shared by the Minister just now, are these new measures expected to be tougher, and will the Ministry of Home Affairs (KDN) work with the PDRM and the Immigration Department to strengthen control over the entry and activities of foreign nationals suspected of joining these syndicates? Thank you.

Mr SpeakerEN

Alright. Minister, please.

Mr Speaker, we are indeed aware that changes always occur in this crime, and KDN itself is of course constantly improving its capacity to deal with the changes that take place. To enhance this capacity, cyber threats, at KDN through the PDRM, we have set up special units, established under the Commercial Crime Investigation Department of the PDRM. Among them is the Digital Forensic Investigation Unit, which specialises in analysing digital devices involved in cyber crime.

Tuan Nurul Amin bin HamidPAS · PNPadang Terap

[Bangun]

We have also set up the Police Cyber Investigation Response Center, which monitors social media and 3R cases. We have also set up the National Scam Response Center unit, which manages the investigation of scam cases, and the Cyber Tactical Unit. Taking into account this issue, which involves international matters as well as other issues, cooperation is always carried out with all agencies in this country. In fact, KDN also establishes cooperation with various countries to ensure this crime can truly be dealt with well, even though the challenges ahead of us are extremely extraordinary. Thank you.

Mr SpeakerEN

Alright. I invite Padang Terap.

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

Alright, thank you Tan Sri Speaker. Honourable Minister, my question is whether the ministry intends to introduce a co-liability system on owners, managers or management bodies of commercial buildings that allow premises to be misused as scammer hubs. And does the ministry plan to make NS due diligence mandatory for high-risk tenants in order to curb this scammer activity? Thank you.

Mr Speaker

Silakan Menteri

Mr Speaker, I mentioned earlier that we are aware that many changes have taken place, and for that reason many steps have been taken, especially in terms of legislative amendments and also increasing staffing capacity. The Honourable Member's views are taken into account, and we will conduct a review for studies to improve what we are doing. But I would like to share here, Honourable Member, that the steps we are taking are actually not limited within the country. If we look at 2022, there were five collaborations involving Singapore, Australia and Taiwan, resulting in the arrest of more than 30 people through love scam and fake job offer scam cases. In 2023, there were three collaborations involving Singapore and Taiwan, also similar cases, with arrests totalling 21 people. In 2024, 10 people were arrested in collaboration with enforcement agencies in Taiwan and Singapore involving investment fraud cases. Now in 2025, the PDRM has carried out four integrated operations with Singapore, Indonesia and China, with a total of 45 arrests. This shows that this crime is not limited within the country but involves overseas. That is why the matter raised by the Honourable Member earlier, we take note and pay attention to. Thank you.

Mr SpeakerEN

Alright, next I invite Kapten Dato' Dr. Zulkafperi bin Hanapi, Tanjong Karang.

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

Thank you, Mr Speaker.

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

From Tanjong Karang to Kuala Sedili, To catch the tenggiri fish; Question number four has been given, I humbly request the Honourable Minister to give an answer. Thank you.

Zulkafperi bin HanapiBERSATU · PNTanjong Karang · questionEN

4. Kapten Dato' Dr. Zulkafperi bin Hanapi (B) [Tanjong Karang] asks the Minister of Health to state that vaping has now become a serious problem and threat to the health of the people, including young people and school students. We are also aware that nicotine is the main substance in vapes that causes addiction and dependency. Is the ministry prepared to re-include nicotine in the list of Poisons Under the National Poisons Act?

Mr Speaker

Silakan Menteri.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Mr Speaker. I request to answer this question together with the questions of the Honourable Member for Sibu dated 30 October 2025, the Honourable Member for Hulu Selangor dated 11 November, and the Honourable Member for Bandar Kuching dated 20 November, because these questions relate to the same matter, namely enforcement measures against electronic cigarettes or vapes. Nicotine is basically still controlled under the Poisons Act 1952. The exemption made previously involves liquid or gel preparations containing nicotine for the purpose of smoking. Now, e-cigarette liquids are controlled under the Control of Smoking Products for Public Health Act 2024 [Act 852], which came into full effect on 1 October 2025. This Act covers the registration, advertising, sale, packaging, labelling, price control and manufacturing of all smoking products, including e-cigarette liquids or vapes. Under section 3 of this Act, all smoking products, including e-cigarettes or vapes, must be registered with the Ministry of Health before being imported, manufactured or distributed. Failure to do so is an offence and may be subject to a fine, imprisonment or both. To curb the misuse of vapes among children, the Ministry of Health enforces the prohibition on the purchase and use of smoking products by underage persons (OBD) through section 13(3) and 17 of Act 852. Online sales are also prohibited under section 10 and may incur penalties if convicted of an offence. Through a whole-of-nation approach, the Ministry of Health implemented the Lung Safety Operation (Ops Selamat PaPa), which began on 1 August 2025. Enforcement of this Act is carried out in an integrated manner together with related agencies

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

such as the Royal Malaysian Customs Department, the Ministry of Home Affairs through the Royal Malaysia Police, the Ministry of Domestic Trade and Cost of Living, local authorities and others, where each agency plays a role according to its respective jurisdiction to ensure comprehensive control over distribution, sales and compliance with the law. In addition, prevention and education programmes such as KOTAK, Jom Sihat, Doktor Muda and Back to Cinema are implemented to provide early exposure to children and adolescents on the dangers of smoking products, to form positive attitudes and to prevent them from being caught up in smoking or vaping. The Ministry of Health is now moving towards a full ban on electronic cigarettes or vapes. This proposal is expected to be tabled to the Cabinet this year to obtain policy approval for the implementation of a full ban on vapes in Malaysia. Thank you.

Mr SpeakerEN

Alright. I invite Tanjong Karang.

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

Thank you, Tan Sri Mr Speaker and the Honourable Minister. With the permission of the Chair, Tanjong Karang would like to welcome the presence of a 38-member KRT delegation from the Sri Aman division who are in the House now. Thank you. [Applause] Mr Speaker, when four states, namely Johor, Kelantan, Perlis and Terengganu, have banned the sale of vapes. And several other states such as Kedah, Pahang, Selangor and Penang are moving in the same direction. Moreover, the statement by the Keeper of the Rulers' Seal, Tan Sri Syed Daniel Syed Ahmad, regarding the 268th Conference of Rulers meeting on 16 July 2025 took note of the proposal to fully ban the sale and use of vapes or electronic cigarettes in Malaysia. This raises a big question from the people. Why does the Ministry of Health Malaysia, as the main agency in safeguarding public health, still not take a firm step to ban the use of vapes at the national level? Does this show that the MOH is lagging behind, indifferent or not aware compared to state governments on an issue involving the future health of our young generation? Thank you.

Mr SpeakerEN

Questions, yes. Yes, please go ahead.

Thank you, Honourable Member, for your concern regarding the issue related to vapes. Indeed, the Ministry of Health is responsible and is also aware of the current situation

of the demands from parents, media friends and also local leaders and Members of Parliament in this House. We indeed once tried to draft an Act known as the Generational Endgame at that time. However, Members in the House had divided opinions regarding the total ban on vapes. Thus, Act 852 came into being, and we want to use this Act to consistently carry out enforcement more strictly. Starting from 1 October 2025, many actions have been taken by us, such as display bans in shops, where we are preventing and also proposing to close vape and cigarette sales outlets. Nevertheless, we are aware of the impact resulting from the misuse of vapes, where if we look through the Regulatory Impact Analysis or RIA that we have conducted, an estimated RM244.8 million has been spent on treatment for diseases such as EVALI. And if this continues like this, we will have to spend more than RM300 to RM400 million by 2030. Because we do not want to waste money on diseases caused by vapes, that is why I gave an answer earlier that we will submit a Cabinet memorandum to the Cabinet for consideration of a full ban and to obtain policy approval to begin the action to ban vapes. And I also hope that the actions and what the Ministry of Health is trying to do this time will receive firm support from Members of Parliament, and we are aware that we need to protect our children to continue the MADANI generation in the future. Thank you, Tan Sri Speaker.

Mr SpeakerEN

Alright. Since this title is important, I want to give the floor to two more people. Jempol, then Tasek Gelugor. Jempol first.

Thank you, Tan Sri Mr Speaker. In the presentation of research findings at the annual meeting of the Radiological Society of North America in Chicago last year, researcher Dr. Marion Nebot explained that vape use can lead to adverse implications for the lung health of a user, even if the vape does not contain any nicotine.

My supplementary question is, has the ministry carried out domestic clinical research to classify the level of risk of lung problems that vape users may face according to category and age group, especially children and individuals with a worrying health history, and what form of integrated support is being intensified together with the Ministry of Education and the Ministry of Higher Education to create holistic awareness of the dangers of vape use to the future and health of students? Thank you.

Mr Speaker

Sila Menteri.

Thank you, Honourable Member. Indeed, we have the latest data on reported diseases associated with the use of smoking products, including electronic cigarettes or vapes, and of that total, 46 cases are EVALI cases, known as E-cigarette or vaping product use-associated lung injury, which involve serious complications affecting the lungs. Meanwhile, 45 cases are non-EVALI, involving other health complications also caused by vapes. We do not have detailed data at this time because diseases associated with vapes are still under study. That is why, before we are further exposed to higher cases, it is good for us to aim for a full ban on vapes like other ASEAN countries such as Brunei, Singapore and Laos, which are ASEAN countries that have already banned vapes. There are 37 countries at present that have already decided to ban vapes, and this has a good effect because we— rather than fighting against cigarettes and vapes, it is better to eliminate or ban one of the harms that exist at present. Thank you. And also Tan Sri Speaker, to add on the measures we are taking. We have programmes such as the Oral Health Programme Without Smoking Practice (KOTAK) and Jom Sihat Doktor Muda, which are programmes we implement together with the MOE, providing exposure to the dangers of smoking to children and adolescents. Thank you.

Mr SpeakerEN

Alright, Tasek Gelugor.

Datuk Wan Saifulruddin bin Wan JanBERSATU · PNTasek GelugorEN

Thank you, Tan Sri, and thank you also, Tan Sri, for recognising that this is an important issue for our country. Tan Sri, I heard just now that the ministry is moving towards a full ban on vapes. I think what we are asking for now is for controls to be introduced now and immediately, while we move towards that. So, I want to ask for an explanation from the ministry, Tan Sri. Can the ministry guarantee that in the upcoming budget announcement, it will be announced that the tax rate on the nicotine content in vapes will be equalised with the tax imposed on cigarettes? Because currently, if we compare nicotine content per millilitre, a box of cigarettes is roughly two millilitres, but one millilitre of nicotine is taxed at only forty sen, roughly ten per cent of the cigarette tax. This creates a big gap. So, people turn to vapes. In addition, there is no— ceiling price, eh sorry. Floor price as imposed on cigarettes. So, can the ministry ensure that in this budget, at the very least immediate action is taken to set an equal tax and also proper price control.

Mr Speaker

Sila Menteri.

Thank you, Honourable Member for Tasek Gelugor. This is a view that we will take to propose to the MOF. If I am given permission to share information regarding a summary of the tax harmonisation of smoking products. For one cigarette stick, it is equivalent to 10 puffs or smoke that comes out. One box of cigarettes is equivalent to 200 puffs per box. For liquid, 1 millilitre of vape liquid is equivalent to 100 puffs, or 2 millilitres of vape liquid equals 200. And also the proposed tax rate on vape liquid tax from 40 sen to RM4 per millilitre. That is a proposal from the Ministry of Health to be accepted by the MOF. However, what we are doing at this time is that on 1 October 2024, full enforcement was implemented. We from the Ministry of Health will intensify enforcement measures

the best way to ensure that the smoking and vaping ban can be carried out as well as possible. Nevertheless, we need the support and cooperation of the public and netizens out there to help, and also not to be afraid to reprimand smokers who smoke in no-smoking areas. This is a step that we need to cultivate among Malaysians, because we have a law that we have enacted, namely Akta 852. Thank you, Mr Speaker.

Mr SpeakerEN

Good. Next, I invite Dato Dr. Richard Rapu anak Begri, Betong.

Thank you, Mr Speaker. Betong question number 5.

Richard Rapu @ Aman anak BegriPBB · GPSBetong · questionEN

5. Dato Dr. Richard Rapu @ Aman anak Begri [Betong] asks the Minister of Rural and Regional Development (KKDW) to state the ministry's long-term plans to ensure that mature rubber smallholdings that are not being tapped in Sarawak can be reactivated through the Abandoned Rubber Programme (PGT) 2025 and beyond, including productivity targets for the next five to ten years, and price support and rubber marketing strategies.

Mr Speaker

Silakan Menteri.

Datuk Hajah Rubiah binti WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker, thank you Honourable Member for Betong for the question. Mr Speaker, the ministry, through the Rubber Industry Smallholders Development Authority (RISDA), has ensured that mature rubber smallholdings in Sarawak that are not being tapped have been identified comprehensively based on the RISDA Census Report 2023. This report recorded an area of 94,800 hectares involving 57,300 smallholders, and as of September 2025, a total of 793 hectares of smallholdings have been successfully reactivated through the Abandoned Rubber Programme (PGT). For 2025 alone, the government has allocated RM38.3 million for the implementation of the PGT, which benefits almost 8,890 smallholders across the country. In Sarawak, particularly in Betong, a total of 218 smallholders have received benefits with an overall value of RM1.5 million. In terms of long-term planning, the PGT will continue to be strengthened under the Thirteenth Malaysia Plan with a target of reactivating 3,100 hectares of untapped smallholdings in Sarawak, which is about 625 hectares a year. Through

Datuk Hajah Rubiah binti WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

this effort, the ministry expects rubber output to be increased sustainably within the next five to 10 years. In addition, the ministry is also preparing a paper plan related to a rubber productivity improvement programme that aims to ensure that yield per hectare can be increased, thereby increasing the income and well-being of smallholders. In terms of price support and marketing, RISDA is expanding the bulk sale method to strengthen the bargaining power of smallholders and ensure more competitive prices. This effort is also being strengthened through close cooperation with the Sarawak Rubber Industry Board (SARIB) to ensure that rubber marketing is more orderly and effective. And in line with this, RISDA has also introduced the Mobile Rubber Marketing Programme (PGB) by providing five vehicle units in Sarawak in 2025, while two additional units will be supplied in the Thirteenth Malaysia Plan (RMKe-13). And this initiative is to make it easier for smallholders to sell in bulk directly to buyers, thereby enjoying fairer prices. Thank you, Mr Speaker.

Mr SpeakerEN

Good. I invite the Honourable Member for Betong.

Thank you, Mr Speaker, thank you Honourable Deputy Minister for the answer given. In Sarawak, there are several agencies involved in the Rubber Smallholders Programme, such as KKDW, KPK, RISDA, LGM and also the Sarawak Department of Agriculture. In terms of policy, coordination and agency responsibilities, the issue of abandoned and untapped rubber smallholdings arises. So, my question is, how is the coordination of this policy carried out between these agencies?

Has there been any overlap or gap in responsibility, and, more importantly, the income of smallholders. Are the subsidies or incentives for re-planting this rubber sufficient to attract these smallholders back to actively cultivating rubber plantations and to make this activity viable in the long term, considering that rubber prices are low and unstable? That is all, thank you.

Mr Speaker

Sila Menteri.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you for the additional question. For the information of Mr Speaker, the close cooperation of RISDA

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

with agencies and ministries related to rubber continues to be strengthened or harmonised based on the policy and implementation of rubber cultivation itself. The ministry, through RISDA, always maintains good cooperative relations with the Sarawak Department of Agriculture in helping and channelling assistance to Sarawak rubber smallholders. The replanting areas under RISDA and also the Sarawak Department of Agriculture are from different target groups. The state RISDA offices will send the list of participants carrying out replanting to the Sarawak Department of Agriculture for information. Based on the Rubber Smallholders Census 2023 data, the area of untapped and abandoned rubber plantations in the state of Sarawak is 94,800 hectares involving 57,300 smallholders. So, starting in 2024, RISDA has implemented a programme to rehabilitate abandoned rubber plantations to ensure that mature rubber plantations that are not tapped and abandoned produce rubber yield. So, through this programme, the assistance provided is the supply of fertiliser, R4, herbicide, tapping tool sets and plantation maintenance, valued at RM3,600 per hectare. RISDA has appointed a subsidiary company, RISDA Plantation Sdn. Bhd., as the implementing agent for this programme. So, to ensure the plantations are cleared and produce yield, RPSB will enter into profit-sharing agreements with the owners of the plantations involved. However, this agreement is based on the consent of both parties, namely RPSB and the plantation owners, and for the information of the Honourable Member as well, indeed for rubber planting, we face issues related to price, but efforts to increase the income of these rubber smallholders are always being implemented, among them, one is through the introduction of an incentive price of RM3, a ceiling price of RM3. Second, the monsoon season assistance. Third, we are also making a new proposal to the government to ensure that the value of productivity per hectare for rubber growers can be increased so that, as people say, the output is greater and can also increase income. However, I cannot announce it here because it is still in the form of a proposal, and God willing we will submit it to the government, and we believe that with incentives or proposals like these, we will be able to increase rubber output and also attract the attention of rubber

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

smallholders to cultivate their rubber plantations. Thank you, Mr Speaker.

Mr SpeakerEN

Good, I invite Kuala Krau.

Tuan Haji Kamal bin AshaariPAS · PNKuala KrauEN

Thank you, Mr Speaker. Based on the total number of rubber plantations in Sarawak, more than 161,000 hectares have great potential in the development of the nation's rubber. So my question is, does the government plan to establish a rubber research centre, or rubber research centre, in Sarawak to support the development of new clones suited to the state's soil and climate conditions, and to create downstream industries based on the very high latex price. And secondly, what efforts are being made to increase rubber yield and extend the economic lifespan of rubber trees by using ethephon stimulant gas, especially in the state of Sarawak? Thank you.

Mr Speaker

Sila Menteri.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you, Honourable Member, for the additional question. First of all, I would like to point out that (LIGS) is the Sabah Rubber Industry Board, not Sarawak, and in Sarawak it is the Sarawak Rubber Industry Board, namely SARIB. So, for the information of the Honourable Member, RISDA has a close partnership with SARIB in efforts to ensure that the rubber industry can be developed more sustainably, based on what people call replanting or re-cultivation, and also ensuring that rubber plantation areas that are not tapped, are tapped. So, there is close cooperation between SARIB and RISDA in ensuring that the programmes we have targeted are implemented in Sarawak. Especially in terms of replanting areas and untapped rubber areas, we have what people call a border, or we have joint notification so that they do not overlap, as people say, do not overlap. In addition, we also have a rubber research centre, namely the rubber research centre in Sarawak, new clones, covering an area of 161 hectares, which is under KPK and not under KKDW, meaning under the state government. So, efforts to increase rubber cultivation in the state of Sarawak are indeed being strengthened through Federal cooperation via RISDA and also through agencies under the state government. Thank you, Mr Speaker.

Mr SpeakerEN

Good, thank you, Minister. I next invite Dato' Seri Amirudin bin Shari, Gombak.

Thank you, Mr Speaker. My next question, question number 6. Thank you.

Amirudin bin ShariPKR · PHGombak · questionEN

6. Dato' Seri Amirudin bin Shari [Gombak] asks the Minister of Investment, Trade and Industry (MITI) to state the latest productivity of workers in Malaysia. What is the ministry's strategy to encourage companies and employers to invest in the latest technology to increase worker productivity, and what are the constraints faced by employers who continue to choose traditional methods based on foreign workers.

Mr Speaker

Silakan Menteri.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

Thank you, Mr Speaker, thank you Honourable Member for Gombak. For the information of this august House, national workforce productivity increased by 2.4 per cent in 2024, with value added per worker amounting to RM99,265 compared with RM96,914 in 2023. This rate is calculated based on gross domestic product (GDP) divided by the current number of workers aged between 15 and 64 years. The New Industrial Master Plan 2030 (NIMP 2030) is the government's commitment to transform the manufacturing sector to become more productive by encouraging companies and employers to invest in the latest technology. The Thirteenth Malaysia Plan, which will be implemented in the period 2026 to 2030, has set a reduction in the ratio of foreign workers to total workforce from 15 per cent to 10 per cent. Among the strategic initiatives and key programmes being implemented to spur automation and boost productivity are the following: First, the Productivity Nexus implemented by the Malaysia Productivity Corporation (MPC), with close cooperation from industry players, focusing on productivity uplift in 14 selected sectors such as electrical and electronics, chemicals and pharmaceuticals. Second, Smart Tech Up, which is a continuation and improvement of the previous Industry Forward programme. This programme sets a target of establishing 3,000 smart factories by 2030, which is in line with the NIMP 2030 aspiration to transform the manufacturing sector towards a high-value economy.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

Third, the NIMP Strategic Investment Fund, or NIMP CoSIF, which introduces a blended financing model that combines the capital market with government fund injections to finance strategic and high-impact projects.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

With regard to the constraints faced by employers who continue to choose traditional methods based on foreign workers, specifically in the manufacturing sector under MITI's purview, these are due, among other things, to the availability of access to low-skilled foreign labour. Overall, the government is optimistic about the clear direction, the introduction of various progressive economic policies, and the commitment to reduce bureaucratic red tape and excessive dependence on low-skilled foreign workers, which will be reduced. Thank you.

Mr SpeakerEN

Good, I invite Gombak.

Thank you, Honourable Deputy Minister, for the answer given, and also congratulations on the increase of 2.4 per cent mentioned in the Deputy Minister's answer just now. However, this productivity figure still lags behind countries like Korea, China and Singapore, so at what year, or within how long, can we achieve that level, as mentioned by the Minister just now? The next question is, I am aware of the issue of technology transition such as automation and so on. Can the government take into account how it is implemented in countries like Germany, where KfW, as an example, or its development bank, provides matching grants to companies to transition through R&D or in automation, and the government uses the increase and injection as an equity injection that the government can own, which also gives a cycle of profits and returns to the government with the strategy that has been used. Would it be possible for this strategy to be considered by the ministry to increase productivity and the capacity of companies in Malaysia? Thank you.

Mr Speaker

Sila, Menteri.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you, Honourable Member for Gombak. Indeed, I agree that productivity increases at a higher rate in other countries

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

such as Korea and Taiwan, where on average Taiwan rose 3.3 per cent and Korea 4.1 per cent, while our average is 3.3 per cent and Vietnam is 3.1 per cent. So it is true, and the government needs to take more serious action to ensure that we reduce our dependence on foreign workers and increase the existing R&D. Our R&D activity is indeed low, and we need much more R&D activity. As for the question or suggestion to learn lessons from the German model, I too agree. The problem now is that our Development Financial Institutions (DFIs) do not have targeted goals or objectives to specifically increase productivity, but I feel this has been taken into account by the MOF, the Ministry of Finance, and reform or restructuring of DFIs is being carried out. Indeed, the Honourable Member's proposal that the government take a share, take equity from the grants that have been given to companies to upgrade or to carry out R&D, is indeed a good proposal. I understand that the Ministry of Finance and also Khazanah have taken this proposal into account and there is a possibility it will be implemented. Thank you.

Supplementary question, Mr Speaker.

Mr SpeakerEN

Yes, please, Honourable Member for Kubang Pasu.

This is regarding the nation's production capacity. The industrial production index (industrial production index) for the month of July is 4.2 per cent year on year, but it contracted 0.3 per cent month to month. Meanwhile, IPI growth slowed at a slower rate, namely 2.4 per cent for the first seven months of this year 2025 compared with four per cent for the same period in 2024. The increase in IPI for July 2025 was due to the manufacturing sector, which rose 44 per cent. My question is, what is the growth of the IPI for the month of August 2025 and the projection of the IPI for the period September to December 2025, given that this period is more challenging because production and export volumes may decline due to the 19 per cent tariff imposed by the United States. Next, what progress has been achieved in the National Semiconductor Strategy (NSS) so far since it was launched by the Most Honourable Prime Minister in May 2025. Thank you, Mr Speaker.

Mr SpeakerEN

Good, please, Minister.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you, Honourable Member for Kubang Pasu. There are five or six questions there. With regard to the IPI, I will provide written information. With regard to the NSS. Indeed the NSS is part of the government's effort to ensure that we are no longer merely Made in Malaysia but moving towards Made by Malaysia. The NSS has had its first anniversary, and our target has been achieved, in a global environment that is not satisfactory. As was said earlier, the global environment this year is indeed less satisfactory because of tariffs and uncertainty. Therefore, in this environment I think we have achieved what we set out to achieve. Thank you.

Mr SpeakerEN

Good, next I invite Datuk Wira Hajah Mas Ermieyati binti Samsudin, Masjid Tanah.

Thank you, Mr Speaker. I am very disappointed, I had thought I would meet the Minister I miss so much. Since yesterday I have been on standby already. Never mind, for question number seven, please let the Deputy Minister answer. Thank you.

[Dewan riuh]

Mr SpeakerEN

Minister, please cheer her up with a nice answer.

Mas Ermieyati binti SamsudinBERSATU · PNMasjid Tanah · questionEN

7. Datuk Wira Hajah Mas Ermieyati binti Haji Samsudin [Masjid Tanah] asks the Minister of Tourism, Arts and Culture to state why Malaysia has still not succeeded in making arts and culture a high-value export commodity even though the country possesses a unique wealth of heritage, and what comprehensive action plan there is to develop arts and culture as a component of the export creative economy.

Tuan Khairul Firdaus bin Akbar KhanBEBAS · GRSDeputy Minister of Tourism, Arts and Culture · Batu SapiEN

Thank you, Mr Speaker. I am also sad that she does not want me to answer her question, Honourable Member for Tanah Merah.

Masjid Tanah.

Eh, Masjid Tanah. Sorry, Masjid Tanah. I see the red tudung. Malaysia is indeed rich in arts, culture and heritage that are unique and have great potential to be developed as high-value export commodities. Although there are certain challenges such as an industrial ecosystem that is still concentrated on the domestic market, standards and

certification of products, which needs to be strengthened, the still-developing level of digitalisation, issues of copyright and intellectual property protection, and competition from regional countries, the ministry sees these challenges as an opportunity to further strengthen the national arts and culture industry development strategy. In line with this, the Ministry of Tourism, Arts and Culture (MOTAC) through the Cultural Policy (DAKEN) is actively implementing the following action plan. Among them: (i) strengthening the branding of Malaysian arts and culture products by encouraging the production of food, craft and performance products that meet export standards, including through international certification and recognition; (ii) strengthening markets and infrastructure by expanding access for cultural products to the Global e-Dagang platform, while improving the offering and variety of cultural products on existing platforms; (iii) mainstreaming digitalisation and innovation through the development of a cultural mapping portal, the use of the latest technology including AI, and raising awareness of the importance of copyright protection; (iv) enhancing cultural diplomacy through close cooperation with the Ministry of Foreign Affairs, Malaysian Embassies, Tourism Malaysia, UNESCO and ASEAN to expand the influence and branding of Malaysian arts and culture at the international level; (v) developing talent and human capital by empowering arts practitioners through training, exposure and mastery of intellectual property (IP) management and international marketing strategies; (vi) encouraging the internationalisation of arts and culture through the recognition of national heritage items at UNESCO, and the continued participation of national arts practitioners and cultural groups in international festivals, thereby raising Malaysia's name on the world stage. The implementation of these measures, which are also in line with the aspirations of the National Creative Industry Policy (DIKN), is believed to ensure that Malaysian arts and culture will continue to

be preserved, strengthened and held in high esteem as an important component of the nation's creative economy.

Furthermore, it will grow as a high-value export commodity and be able to contribute significantly to the national economy. Thank you.

Mr SpeakerEN

Good. Masjid Tanah.

Thank you, the Honourable Deputy Minister, for the answer given, and I understand that a engagement session on the national cultural policy was held last month and was attended by many arts and cultural practitioners of the country. So, congratulations and well done. However, I would like to ask the Honourable Minister. I understand there are many applications, applications for the Cultural Sector Support Grant (GSSK), that are still many yet to be approved, and I understand there are many still at the Honourable Minister's office. Why leave it to the Honourable Minister to review those applications? Isn't it sufficient for the Secretary-General (KSU) to do so? And what immediate steps can the ministry take to expedite the approval process and also the disbursement of those grants, especially those that will expire before the 2025 financial year? Because this is very important. We always talk about tourism, but I see that the cultural sector seems to be sidelined and does not receive attention from the Honourable Minister himself. Thank you for the attention of the Honourable Deputy Minister.

Mr Speaker

Silakan Menteri.

Thank you, the Honourable Masjid Tanah. For the information of Members of the House, the theme Malaysia – Visit Malaysia Year 2026 next year has clearly positioned Malaysia as a sustainable destination rich in culture.

[Bangun]

With a theme like this, it has clearly shown that this ministry places emphasis on cultural elements. The cultural sector will certainly be empowered. We will certainly

introduce to tourists out there how beautiful our culture is. Besides that, as was raised by the Honourable Masjid Tanah, we have just completed an engagement session last month. Through that engagement session itself, we have identified several elements that we can also include in the tourism sector so that we can incorporate both of them so that it is seen as a robust combination. Apart from that, Masjid Tanah, regarding the questions raised, apart from that, we will provide written answers. Because the answer will be considered somewhat controversial. I don't want Masjid Tanah to be angry with me, okay. Thank you, okay Masjid Tanah. Thank you.

Mr SpeakerEN

Good. I invite Kuala Pilah.

Thank you, Mr Speaker. My question is, does MOTAC intend to establish strategic cooperation with global streaming companies such as Netflix, Disney, or Spotify to market local films, music and cultural content to the world market? And furthermore, how does the ministry ensure that the action plan to develop arts and culture as an export commodity also involves grassroots arts practitioners such as batik, songket, wau, music and traditional dance makers so that they are not left behind in the global creative economy current? Thank you, Tan Sri.

Mr Speaker

Silakan Menteri.

Thank you, the Honourable Kuala Pilah. Indeed, several things have been done by us to introduce our cultural sector, and this will also directly have a very good impact on the economic creative industry or creative industry. The most obvious one, we know that under this ministry there is the Cultural Matching Support Grant (GSSK). Through this grant, we give the widest possible space to industry players to hold and also implement programmes that are closely related to the cultural sector. Moreover, many programmes held under this grant can be clearly seen in their returns, not only to industry players, but also to the local community.

Besides that, under our ministry there is also one agency, the National Heritage Department. The National Heritage Department shows its commitment to enrich and also promote our heritage foods. In addition, with the close cooperation between the National Heritage Department and Kraftangan Malaysia, it can establish a cooperation and also a dynamic understanding of how the framework should be carried out so that we ensure what has been raised by the Honourable Kuala Pilah can be achieved. Thank you.

Mr SpeakerEN

Good, next I invite Tuan Yuneswaran a/l Ramaraj, Segamat.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Thank you, Tan Sri Speaker. Segamat question number 8.

Yuneswaran a/l RamarajPKR · PHSegamat · questionEN

8. Tuan Yuneswaran A/L Ramaraj [Segamat] asks the Minister of Health to state the government's decision regarding the prohibition of electronic cigarettes (vape) which currently has a bad effect on public health and increases the burden of treatment costs for diseases related to smoking in the Ministry of Health Malaysia.

Mr Speaker

Silakan Menteri.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, the Honourable Segamat. Tan Sri Speaker, I request to answer this question together with the question of the Honourable Muar dated 13 October, and also the Honourable Mas Gading dated 30 October because these questions are related to the same matter, namely the government's stance on the total prohibition of electronic cigarettes and also vape.

Mr Speaker

Silakan.

The Ministry of Health is fully committed and is moving towards the implementation of a total ban on electronic cigarettes or vape. This proposal of prohibition is expected to be tabled to the Cabinet this year to obtain policy approval as an initial step towards a total ban in Malaysia. The Ministry of Health takes note of the challenges faced by the country, such as the risks of smuggling and the black market if the prohibition is implemented. Therefore, any steps towards prohibition will be accompanied by comprehensive multi-layered mitigation strategies including integrated enforcement involving various other ministries and agencies including the Royal Customs Department

Malaysia, the Ministry of Home Affairs through the Royal Malaysia Police, the Ministry of Domestic Trade and Cost of Living, local authorities and other agencies, besides strengthening the workforce. In terms of tax collection revenue from vape in 2024, it totalled RM111 million. However, the estimated cost of treating vape-related diseases including EVALI has reached RM223 million in 2024 and is expected to continue increasing. This shows that the health cost burden far exceeds the fiscal benefits. The prohibition approach will be implemented in stages with enforcement, education and community support as important components. The role of NGOs and communities will also be mobilised to reduce demand and shape behavioural change. At this time, the Ministry of Health gives priority to the full enforcement of the Control of Smoking Products for Public Health Act 2024 or Act 852 starting 1 October 2025. This Act covers strict and comprehensive controls including requirements for product registration, prohibition on advertising, promotion and sponsorship, control over the sale of smoking products, and a ban on smoking in areas that have been gazetted as no-smoking areas. However, the law alone is not sufficient because public health protection requires the involvement of all parties. Therefore, the role of the public is very important in this effort. The public is encouraged to channel complaints regarding violations of smoking product laws via WhatsApp at the hotline 010-8608949 or the website www.jomlapor.com. This approach not only strengthens enforcement, but also mobilises all Malaysians to work together to achieve the national target of a smoke-free nation by 2040. Thank you.

Mr Speaker

Segamat.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Thank you, Tan Sri Speaker. Thank you, the Honourable Deputy Minister. This is because I see efforts to continue moving towards banning vape in Malaysia. Not only vape, including cigarettes. I would like to refer to the Prevention and Control Non-Communicable Disease 2024 report tabled by the Ministry of Health. Where the smoking culture among young people aged 13 to 17 years increased from 9.8 per cent in 2017 to 14.9 per cent in 2027. This

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

shows that the trend of smoking or vaping among the young generation is increasing day by day. I would like to ask the Honourable Minister and the Ministry of Health. Is the ministry ready to review or to amend the generational endgame again and return to this Parliament for us to review in order to save the generation of those who will be born in 2007, that we can save them in Malaysia. Because it is not only e-cigarettes, but smoking also has a big impact on public health and also on the country's economy. Thank you, the Honourable Minister.

Mr Speaker

Sila Menteri.

Thank you, the Honourable Segamat. Indeed, it is our aspiration to carry out a bill related to the generational endgame. Nevertheless, we are proceeding, moving forward, with permission Tan Sri Speaker, with the existing Act, 852, which is comprehensive and also has a more aggressive approach, especially in the enforcement part. For example, we have already fully enforced the prohibition of display bans on smoking products at cigarette sales premises, and very active enforcement is carried out by enforcement officers. Although we have a shortage in terms of allocation to add more staff and also purchase body cameras for this enforcement, what we use is through methods of strategic placement of our enforcement in strategic locations. Nevertheless, this GEG approach will be reviewed from time to time. We are now focusing on the prohibition of vape and we hope that the Cabinet can provide a clear policy on how to ban vape through the best methods so that we can prevent the use of vape which is very, very harmful and also the prevalence shows that the use of vape is very critical, where the use of vape among children has also increased, Tan Sri Speaker. And also, we are making substantial investments, for example, for the tobacco control package alone, we spend a large amount of RM121.94 million for public health interventions. If we can

ban vape and also reduce the prevalence of smoking, we can make large savings, which we can achieve within a period of five to 15 years, where if we invest RM1.00, we will get a return of RM1.21. Nevertheless, Honourable Member, even outside the topic of vape, I would like to explain that there are also major challenges, not just tobacco. We also face non-communicable diseases, and our main threat at this time is salt, where if we can reduce salt intake, for every RM1.00 we invest, we will get a return of approximately RM4.50 from this salt reduction. Nevertheless, once again I emphasise that we will fully enforce and also step up enforcement actions comprehensively, and this GEG approach will be reopened if the smoking prevalence has reached an appropriate level for us to ban it completely. Thank you, Tan Sri Speaker.

Mr SpeakerEN

Good, I invite Tumpat.

Thank you, Tan Sri Speaker. My supplementary question, I am very excited by the government's readiness to ban vape. However, following the recent answer by the Minister of Home Affairs stating that Ispire-Tech in Senai which manufactures the vape is for the local market. But a report from CodeBlue states that "Terdapat pembinaan fasa kedua milik syarikat tersebut yang dianggarkan mula beroperasi pada suku ketiga tahun ini yang mempunyai 80 barisan pengeluaran. Operasi kilang ini mengeluarkan kapasiti sebanyak 61 juta peranti ataupun 107 juta pod sebulan". It will be exported abroad as reported by NST. Does this mean that our country's policy is in principle still supporting e-cigarettes globally because this is for the international market? So, we see a difference and contradiction between the policy stated and the construction of companies that produce vapes like this. That is the first. And second, in the budget, the government informed that the excise duty collected from these vapes is used for nicotine health education. My question, is there a clear mechanism independently audited to analyse the extent to which the use of more than 100 million of this duty is used for that purpose? Thank you.

Mr Speaker

Sila Menteri.

Thank you, the Honourable Tumpat. Regarding the mechanism or methods for us to conduct an audit on the use of the excise duty proceeds from this vape, we do not yet have a specific method. Nevertheless, we have only just started collecting this excise duty. As in the answer I mentioned earlier, the collection so far totals nearly RM111 million. Nevertheless, we still cannot see the fiscal benefits we obtain, where the expenditure for treating diseases related to cigarettes and vape has reached nearly RM230 million. This is an issue and indeed the registration of cigarette and vape e-cigarette products is increasing. And also, for sharing in this House, smoking products in the form of e-cigarettes or vape, what has been approved is around 801 approvals and certificates have been issued. Nevertheless, towards the prohibition of vape, that is where we need the policy from the Cabinet because it involves the approval of vape and cigarette products, as we look at it from the fiscal side for increasing revenue and also to use this excise tax for literacy programmes regarding the use of e-cigarettes and vape. This has been done over the past few years using smoking literacy programmes, but for vape specifically we still do not have detailed information on how this allocation is used for specific programmes for the prevention of cigarettes and vape. We will share from time to time through our report to the Parliamentary committee on health. Thank you, Tan Sri Speaker.

Mr SpeakerEN

Good, next I invite Tuan Abdul Latiff bin Abdul Rahman, Kuala Krai.

Thank you, Tan Sri Yang di-Pertua. I would like to recite a pantun. Kereta Nasional penuh keterampilan, Hasil tangan anak tempatan; Soalan Kuala Krai nombor sembilan, Mohon Menteri berikan jawapan.

[Translation:] The National Car, full of finesse, Handiwork of local children; Kuala Krai question number nine, I humbly ask the Minister to give an answer.

Abdul Latiff bin Abdul RahmanPAS · PNKuala Krai · questionEN

9. Tuan Haji Abdul Latiff bin Abdul Rahman [Kuala Krai] asks the Minister of Investment, Trade and Industry to state: (a) whether local vehicles will experience a price increase due to the calculation of the new 2025 tax, whereas EVs receive an exemption until 2027; and (b) whether the ministry intends to abolish the tax on local vehicles and CKD to reduce the burden on consumers and ensure the fairness of the National Automotive Policy.

Mr Speaker

Silakan Menteri.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

Thank you, Tan Sri Mr Speaker, and also thank you to the Honourable Member for Kuala Krai. Up to now, the Ministry of Finance is studying the impact on vehicle costs if the current regulations on the method of calculating the cost value of a vehicle for excise duty, namely P.U.(A) 402/2019, are implemented. Therefore, the Ministry of International Trade and Industry (MITI) expects vehicle prices not to be affected by this regulation for the time being. Basically, the government does not intend to abolish excise duty on vehicles, whether locally assembled or imported. The current rates and the method of introducing excise duty are an important medium to support the promotion and development of the local automotive industry. However, as for import duty, more favourable rate treatment has the potential to be enjoyed if companies in Malaysia make use of import schemes from source countries that are Malaysia's trading partners under various Free Trade Agreements (FTA). Nevertheless, the incentive of full exemption from import duty and excise duty can still be enjoyed for the purchase of fully built-up imported electric vehicles until the end of this year. Meanwhile, for those assembled in this country as CKD, this incentive is extended for another two years until 2027. To reduce the impact of these indirect tax rates on vehicle prices, the government has provided tax exemption incentives to the local vehicle manufacturing and assembly industry. This incentive is intended to enable the domestic automotive industry to continue to grow and to provide positive spillovers to the wider economy, such as in the development of supply chains or the promotion of R&D and employment opportunities for the people. In addition, apart from the benefit of this tax exemption, local vehicle manufacturing and assembly companies

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

can offer more competitive vehicle prices in the local market. Thank you.

Mr SpeakerEN

Yes, please, YB.

Thank you, Tan Sri Mr Speaker. Thank you, the Honourable Deputy Minister. While EVs continue to be given tax exemptions until 2027, rural people who still depend on conventional vehicles now face the risk of price increases due to the new tax structure.

There are affordable vehicle price offers that have been reduced, such as the Axia by Perodua. This is not because of reduced excise duty but because of removed accessories. Old technology. Including no safety features. My question is, what are the concrete steps, as mentioned by the Honourable Member just now, and I want further certainty, what are the ministry's concrete steps to ensure that these automotive policies are truly fair, including introducing specific incentives for rural consumers such as tax rebates so that they do not become victims of technological transition that is not yet available? And what are the government's obstacles to at least reducing the taxes on locally made Proton and Perodua vehicles with low power, 1,000 or 1,500 and below, so as to give people the opportunity to enjoy local car prices more cheaply, as per the formulas that were put forward before becoming the government? Thank you.

Mr Speaker

Sila Menteri.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you. First of all, as I said, this regulation is still being studied by the Ministry of Finance (MOF). Therefore, no decision has yet been implemented.

[Bangun]

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Second, if local companies such as Perodua, if they, what is this, the use or implementation of a fully local supply chain, they get a rebate of excise duty of nearly 90 per cent or more than 90 per cent. Therefore, the purpose of excise duty is to ensure as much localisation as possible is implemented to benefit our supply chain. And there is indeed a need for the government to think or plan further for this sector because of the very great challenges that we face

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

now, which are the transition from ICE or ICE cars to EVs or electronics, and also competition from low-priced products from China. Therefore, the government, through MITI, has set up a committee or Council of Automotive Eminent Persons to review the policies on automotive policy, and the results of this review will be announced at the end of this year. Thank you.

Mr SpeakerEN

Alright. I invite Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Tan Sri Mr Speaker. Honourable Minister, for these past three years, the government has promoted the EV industry, to the extent that we gave tax exemptions to EV cars and also brought Tesla in. And recently, the government announced the BUDI95 Scheme. So, one of the selling points, with your permission, of using EV cars is that previously we said that if we charge with electricity, the cost is lower, but now with the reduction in the price of RON95 petrol to RM1.99, how will this affect the purchase and expansion of EV cars in Malaysia? Because every government policy or direction must be consistent. If just now Kuala Krai wanted to ask about fairness for ICE cars, I now want to ask about fairness for EV cars. Many in Malaysia have adopted the government's policy to enter into the use of EV cars. Now, one of their selling points is gone. So, consistency is important for us to attract the use and investment of the EV industry to Malaysia. So, my question is. Does the government have any policy now to balance fairness for those who have already used EV cars? As I could mention just now, for CBU cars, EVs, the tax exemption will end at the end of this year. Does the government have any intention to extend it again, so as to give a clearer signal to consumers and EV investment that we in this country still support the development of the EV industry? Thank you.

Mr SpeakerEN

Alright. Please, Minister.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you, the Honourable Member for Tebrau. EV technology has changed a lot over the past three years. We no longer distinguish EVs only as battery EVs, but there has emerged something like REV, in which petrol and battery are used together or simultaneously. And technology― our view is

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

that the upcoming technology will place more emphasis on simultaneous use, in which battery and petroleum will be used together. Therefore, I think that from the technology perspective, the contradiction does exist but not by much, because technology has changed and users who have enjoyed what is this, disposal or tax exemptions, have enjoyed the benefits given by the government to promote EVs. So, I think there is no fairness issue for those who have enjoyed tax exemptions. But, for the government's direction, we will focus on energy efficiency. Whether it is a battery EV, a range-extended EV or an HEV, as long as the cars used on our roads use petroleum that is not― roughly less than what they use now. Energy efficiency, that is, energy efficiency, is our target. Thank you.

Mr SpeakerEN

Alright. Honourable Member, the Question Time for oral answers has now ended for today. The Minister has a motion. Please proceed. [Question Time for Oral Answers ended]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Datuk Hajah Rubiah binti Haji WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

Mr Speaker, "That, pursuant to Standing Order 12(1), I respectfully propose that today's Sitting not be adjourned until the list of debaters to be announced for the Minister's Motion in the Prime Minister's Department, as at number 1 in the order of business of the meeting and today's motions, is completed, and after that, the Sitting of the House shall be adjourned until 10 a.m. on Wednesday, 8 October 2025."

Mr SpeakerEN

Alright. Does anyone second it?

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

I hereby second it.

Mr SpeakerEN

Alright. Thank you, Honourable Member. Now I put the question to the House for decision. The question is that the motion as proposed just now be agreed to.

[Motion put for decision; and agreed to]

Motion Under S.O. 18(1) by the Honourable Member for Bukit GelugorUrgent matter

Mr SpeakerEN

Alright. We have a motion. Therefore, please, Bukit Gelugor.

Thank you, Mr Speaker. Mr Speaker, I have submitted a motion under Standing Order 18(1) which reads as follows. That the House sitting today discuss the latest status of the Royal Malaysia Police (PDRM) regarding investigations into individuals believed to be responsible for handing over drugs to a Malaysian citizen named Encik Pannir Selvam Pranthaman, who has been sentenced to death in Singapore for smuggling drugs from Malaysia into Singapore. The sentence is scheduled to be carried out in the early morning of 8 October 2025, which is tomorrow, Wednesday, according to an execution order, namely an execution notice, with permission, which was issued recently. Encik Pannir Selvam was interviewed by a senior officer from the Royal Malaysia Police at Changi Prison in Singapore on 27 September 2025. The interview lasted approximately three hours, during which Encik Pannir Selvam provided information regarding the individuals believed to be responsible for handing over drugs to him in Malaysia for smuggling into Singapore. The information provided may possibly lead to the prosecution of the masterminds behind the drug smuggling crime in Malaysia.

The cooperation and assistance provided by Encik Pannir Selvam has the potential to cripple the activities of this cross-border drug smuggling syndicate

which will directly benefit Malaysia and also Singapore. This matter is specific, namely whether there is any active investigation being conducted by the PDRM concerning this matter. Second, this matter requires urgency considering that the death sentence on Encik Pannir Selvam is scheduled to be carried out tomorrow, 8 October 2025, in Singapore. And thirdly, Mr Speaker, this is a matter of public interest, considering that it concerns the life of a Malaysian citizen who is about to be sentenced to death, and this case has also attracted the attention of the public, non-governmental organisations and the media at national and international levels. That is all, thank you, Mr Speaker.

Mr SpeakerEN

Alright, thank you, Bukit Gelugor. Honourable Member, I have received a notice of motion under Standing Order 18(1) from the Honourable Member for Bukit Gelugor on Monday, 6 October 2025. The text of the motion is as read out by the Honourable Member for Bukit Gelugor just now. In order for this matter to be considered by the House, the Speaker must be satisfied that the matter raised by the Honourable Member meets three conditions. The first condition is that the matter is specific. The second condition is that it is of public interest, and the third condition is that it requires urgency. I have examined this matter and found that: (a) Specific. This matter is a specific matter; (b) Of public interest. It is in the public interest; and (c) Requires urgency. This matter also needs to be expedited. Therefore, I allow this motion to be debated in the Special Chamber this afternoon. Thank you. Secretary.

Bill Brought Into the Meeting — Supply Bill 2026 First ReadingBill

A Bill intituled an Act to authorise the withdrawal of a sum of money from the Consolidated Fund for the services for the year 2026 and to appropriate that sum for services for that year; brought to the House by the Minister of Finance (II) [Datuk Seri Amir Hamzah Azizan]; read the first time; to be read a second time on Friday, 10 October 2025, at 4 p.m.

Bill Brought Into the Meeting — Private Agency (Amendment) Bill 2025 – First ReadingBill

A Bill intituled an Act to amend the Akta Agensi Persendirian 1971; brought to the House by the Deputy Minister of Home Affairs [Datuk Seri Dr. Shamsul Anuar bin Haji Nasarah]; read the first time; to be read the second and third time at the same Sitting.

Minister's Motion under S.O. 27(3) on the Report of the Auditor GeneralMotion

Dato’ Sri Azalina binti Othman SaidUMNO · BNMinister in the Prime Minister's Department (Law and Institutional Reform) · PengerangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Tan Sri Mr Speaker, "RECOGNISING that in the national accountability system, the Office of the Auditor General is an oversight agency that plays a role in verifying that all activities and finances approved by Parliament are implemented by the executive branch with full accountability. The Auditor General shall determine whether, in his opinion, money has been used for the purposes for which it was allocated or authorised, and whether the activities related to it are carried out or managed in an efficient manner, with due regard to the avoidance of waste or extravagance, as provided in the Audit Act 1957 [Act 62]. RECOGNISING that the Auditor General, in carrying out the mandate and responsibilities, requires serious attention from the relevant parties so that the issues raised are given due attention while the main recommendations contained in the Auditor General's Report (LKAN) are implemented effectively. RECOGNISING that the LKAN has been tabled in the Dewan Rakyat on Monday, 6 October 2025, namely LKAN 3/2025 (Command Paper 14 of 2025) on the Financial Statements of the Federal Government for the Year 2024 and the Activities of Federal Ministries/Departments/Companies. UNDERSTANDING that the LKAN raises issues relating to the custody of public money or public deposits that require effective action from the ministries, departments and agencies audited. ACKNOWLEDGING that the government takes seriously the issues raised in the LKAN, and the Most Honourable Prime Minister himself has directed that the relevant Ministers examine the issues raised. All issues involving leakage, non-compliance with regulations, failure to comply with conditions and weaknesses in planning must be examined and corrective action taken. All criticisms should serve as lessons so that they are not repeated. THAT in the Auditor General carrying out his mandate, this august House calls upon all parties to unite and support the government so that the audit findings and recommendations contained in the report can be acted upon with

Dato’ Sri Azalina binti Othman SaidUMNO · BNMinister in the Prime Minister's Department (Law and Institutional Reform) · PengerangEN

seriousness by the parties concerned to overcome the weaknesses found so that they do not continue to occur." [Dato' Indera Mohd Shahar bin Abdullah (Paya Besar) in the Chair] Mr Speaker, audit is not merely a financial review. It is the main mechanism for ensuring there is no leakage in the management of the people's money. To ensure this mechanism functions effectively, audit institutions need to be strengthened. This step of examination is realised, sorry. This step of strengthening was realised when the Audit Act 1957 was amended in 2024 after 33 years of not being touched. This amendment opens a new chapter for the National Audit Department as an independent audit institution that plays an important role in ensuring government accountability at all levels. The Most Honourable Prime Minister has stressed that the government will not interfere in audit matters. Instead, it gives full space to the National Audit Department to act professionally and independently. Moreover, the scope of auditing has now also been expanded to more than 2,000 government-linked companies (GLCs), an important step in the public service reform agenda for integrity and good governance. Mr Speaker, when the Auditor General's Report (LKAN) is tabled, it is not merely placed on the table. We allow this report to be examined and debated openly in the Dewan Rakyat because only through debate and scrutiny can we rectify weaknesses, understand criticisms and improve the system. When space for debate is given, it proves that the MADANI Government is not afraid of criticism, but rather accepts views to continue improving what needs to be improved. Including this time, the LKAN has been tabled and debated for the sixth time in this august House. We have seen positive trends from year to year, as a result of constructive discussion and criticism, therefore I record my appreciation to all the Honourable Members who have contributed to this debate. The Auditor General's Report (LKAN) was tabled in this august House on 6 October 2025, namely LKAN 3/2025, on the Financial Statements of the Federal Government for the year 2024 and the activities of federal ministries, departments and companies.

Dato’ Sri Azalina binti Othman SaidUMNO · BNMinister in the Prime Minister's Department (Law and Institutional Reform) · PengerangEN

This LKAN is more comprehensive compared to previous LKANs and covers the verification of the Financial Statements of the Federal Government for the year ended 31 December 2024, financial analysis of the Federal Government, performance of development project implementation of the Twelfth Malaysia Plan, main audit focus, audit of representative offices, audit of the status of completion of the forward operating base project in Pulau Mabul, audit of government companies and the status of action on issues reported in the LKAN. To improve on the weaknesses raised or to prevent the same weaknesses from recurring, a total of 27 recommendations have been submitted in this LKAN for action by the relevant federal ministries, departments, agencies and companies. For the first time, the status of audits through the e-SelfAudit system is also reported in this LKAN. Launched by the Most Honourable Prime Minister in February this year, e-SelfAudit is part of the national audit reform that uses artificial intelligence (AI) technology to improve efficiency and accuracy of analysis.

Dato’ Sri Azalina binti Othman SaidUMNO · BNMinister in the Prime Minister's Department (Law and Institutional Reform) · PengerangEN

Before the e-SelfAudit system was introduced, the number of companies that the National Audit Department could audit was very limited because it depended entirely on the available manpower. With the e-SelfAudit system, this challenge can be overcome. The implementation of the e-SelfAudit system has brought about encouraging achievements for the National Audit Department. Whereas previously audit capacity was limited, this new system has enabled the National Audit Department to audit a large number of 1,856 companies. Mr Speaker, the debate on this LKAN reflects the government's commitment to transparency and accountability. It sends a clear message that the management of public funds must be free from leakages, and that Audit findings must be followed by prompt corrective action. Finally, the Honourable Prime Minister has emphasised that every Minister is fully responsible for the findings in LKAN 3/25, so that recurring weaknesses can be dealt with thoroughly. Therefore, Mr Speaker, I beg to move. Thank you.

Is there anyone who supports?

Datuk Seri Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

I beg to second.

Thank you, Honourable Minister. Honourable Members, the question now is that the motion of the Honourable Minister at the Prime Minister's Department be opened for debate. I have in my hands a list of 24 debaters for the Auditor General's Report 3/2025. The first debater, Honourable Sandakan, Honourable Sik, Honourable Tampin, Honourable Machang, Honourable Pasir Gudang, Honourable Temerloh, Honourable Jelutong, Honourable Tumpat, Honourable Jempol, Honourable Jerlun, Honourable Bayan Baru, Honourable Jerantut, Honourable Seputeh, Honourable Tangga Batu, Honourable Rasah, Honourable Padang Serai, Honourable Besut, Honourable Bukit Bendera, Honourable Tanjong Karang, Honourable Maran, Honourable Mas Gading, Honourable Pengkalan Chepa, Honourable Arau and, last, Honourable Kota Melaka. The time allocated to all debaters is eight minutes. I invite the first debater, Honourable Sandakan, for eight minutes.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Thank you, Mr Speaker, for the opportunity given to me to take part in the debate on the Auditor General's Report 2025. So, there is one theme that recurs every time the Auditor General's Report is tabled in the Dewan Negara, namely that projects from various ministries and agencies fail to be implemented as planned, such as projects labelled as "sick projects". So, they experience significant delays, costs increase beyond — which is very significant — and the objectives of these projects are also not achieved. So, this theme recurs year after year, and the public in general has begun to question the effectiveness of the Audit Report in bringing about tangible change. So, this time page 81 of the Auditor General's Report has highlighted that, as of 31 December 2024, there were a total of 157 sick projects involving 18 ministries. The Ministry of Education Malaysia (KPM) recorded the highest number of delayed projects at 46 projects, followed by the Ministry of Rural and Regional Development (KKDW) with 34 and the Ministry of Energy Transition and Water Transformation (PETRA) with 12 projects, and the Ministry of Government Development (KPKT) with 11 projects.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

So, Mr Speaker, I would like to request that the government provide a comprehensive comparison, starting from 2015 until now, regarding the number of sick projects recorded by the Auditor General each year. Is the number of these sick projects increasing or decreasing from year to year? This is an important indicator of whether sufficient corrective action has been taken by - against the findings raised by the Auditor General. Basically, I really welcome the tabling of the Auditor General's Report because this is an important check-and-balance mechanism against all departments and all government agencies. I - to ensure that processes and SOPs are complied with, leakages can be addressed, and taxpayers' money is spent prudently and effectively. Accordingly, I urge the government to investigate every issue raised in this report and provide answers to the public regarding those matters. Firstly, is there any element of misconduct or breach of trust involved in each non-compliance and sick project mentioned in the Auditor General's Report? What actions are being or have been taken to address these non-compliances and weaknesses? Merely strengthening or monitoring is insufficient. We need systematic investigation and also positive action against those who have proven to be irresponsible and negligent in carrying out their trust. So, Dato' Speaker, I also wish to voice concern over the issue raised in the report regarding the completion of the Forward Operating Base Project on Pulau Mabul, Semporna, Sabah is a - within the control area under ESSCOM. The Forward Operating Base Project for the Eastern Sabah Security Zone (ESSZONE) on Pulau Mabul for the marine police unit, which was approved almost 10 years ago, is still not completed and now requires additional allocation of RM28.7 million, according to the report. So, this project, which aims to strengthen border security and coastal security on the East Coast of Sabah, was proposed by ESSCOM under the Eleventh Malaysia Plan with an original allocation of RM52.81 million. After a decade has passed, this project is still far from complete and

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

the contractor is currently in the process of being wound up, causing the government to risk being unable to claim any compensation. So, it is clear that the original objective of the project to reduce the response time of public security forces and reduce cross-border crime has failed to be achieved. The failure to implement this project effectively may have serious implications for national security. Our frontline forces have carried out their responsibilities with full dedication. However, they need strong supporting infrastructure to protect the nation's sovereignty. So, no compromise can be made on national security. So, Mr Speaker, all of this has passed by with a familiar ring. So, these same issues are raised every year. For example, Package 4 of the Libaran Bypass Highway Project in Sandakan. I have stood up many times and here I still have to stand up again. The overall construction period of this project, over a length of eight kilometres, has dragged on for more than 10 years but is still not completed. A bridge under this project has collapsed, not once but twice. However, until now, no agency has been able to provide an answer regarding the cause of the bridge collapse, whether it was due to non-compliance, design weaknesses or negligence by the implementing party. Who is the party responsible, who must take this responsibility? How much additional cost has been spent to rescue this project? And, most importantly, when will this road finally be completed and opened for public use? All these answers have still not been given to me, even though they have been raised many times. So, sick projects like these not only affect administrative efficiency but also tarnish the reputation of the MADANI Government. Firm and concrete action must be taken by the relevant authorities to address all these weaknesses and failures, not merely discussed on paper. So, to conclude, I want to stress that positive and firm follow-up action must be taken - punitive and firm action must be taken against those found responsible and stated in the Auditor General's Report. Indeed, cases like these must be investigated, with elements of crime such as breach of trust or misconduct.

Puan Vivian Wong Shir YeeDAP · PHSandakanEN

Only in this way can we uphold justice and protect the reputation of thousands of civil servants who work hard for the nation and the people. That is all, thank you.

Thank you, Honourable Sandakan. Next, Honourable Sik. Eight minutes.

Peace be upon you and the mercy of God. Thank you, Honourable Mr Speaker. Today, I also wish to take part in the debate on the Auditor General's Report Number 2 of 2025. Because this audit report is not merely a technical report but a reflection of the integrity and effectiveness of public management, as well as a measure of whether the trust of the people is truly being safeguarded or otherwise.

Therefore, it is the responsibility of this House to examine every finding and audit observation thoroughly, not merely as an annual ritual but as a check-and-balance mechanism on the implementation of policies and the use of the people's money. In this debate I will focus on two separate reports that have a direct impact on fiscal integrity and the welfare of the people. The first concerns the procurement of oil palm estates by FELCRA Berhad. And the second concerns the management of controlled prices and cooking oil subsidies under the Ministry of Domestic Trade and Cost of Living (KPDN). Mr Speaker, the first is the management of the procurement of oil palm estates by FELCRA Berhad. The Auditor General's Report found that FELCRA carried out the procurement of leases and purchases of four oil palm estates between 2022 and 2024 with a total value of RM241.76 million. Of this amount, one involved the purchase of an estate in Telupid, Sabah valued at RM62.29 million, while the other three were leases in Gua Musang, Kelantan. The audit findings affirm the existence of serious irregularities in the procurement process, including failure to comply with the principle of due diligence and procurement management procedures that should be the guidelines for government-owned companies. Specifically regarding the Telupid estate in Sabah, the audit report shows that FELCRA proceeded with the purchase of the estate despite weaknesses in the feasibility assessment and concerns in administrative records. The purchase price for the Telupid estate was recorded at around RM62.29 million, while the audit

raises the same question, and that the ownership move was supported by adequate independent study before approval was made. Such action poses a risk that the asset given…

Sik, Sik, a little, Sik.

What Sik has raised is the second report, not the third report now, Sik. That is within our consideration.

Yes, thank you, Honourable Member. I also raised the earlier report. As an important report to be looked at in this Auditor General's Report, to ensure that the overall report every year is important for us to look at in this Parliament, so that each of these government agencies can be managed as well as possible.

Honourable Sik.

I think the Honourable Member is focusing on the Financial Audit Report 3/2025, yes.

Yes, alright. Alright, Honourable Member. Perhaps I will look at that more carefully, and I see there are also important matters including the report tabled here. And I think that is all for my speech today. Thank you.

Thank you, Honourable Sik. Next, Honourable Tampin.

In the name of God, the Most Gracious, the Most Merciful. Peace and greetings be upon you, and greetings of Malaysia MADANI. Thank you, Mr Speaker, for the permission, space and opportunity given to me to take part in the debate on the Auditor General's Report Number 3/2025. Dato' Indera Speaker, first of all I wish to record my appreciation to the government, especially the Ministry of Finance, for succeeding in improving the financial performance of the Federal Government last year. [Applause]

As reported through the LKAN this time, namely first, the Federal Government's deficit position has shown a decline to RM79.166 billion in 2024 compared with RM91.390 billion in 2023. Second, the ratio of deficit to GDP (KDNK) has also recorded a decrease to 4.1 per cent in 2024 compared with five per cent in 2023. Third, Federal Government revenue has also recorded an increase to RM326.355 billion in 2024 compared with RM315.9166 billion in 2023. Fourth, Federal Government expenditure in 2024 has also shown a decrease to RM405.521 billion compared with RM407.356 billion in 2023. Congratulations and commendations are extended to all parties who were involved, whether directly or indirectly, in contributing ideas and expertise so that these figures could be successfully recorded. However, behind these seemingly positive figures, there is still much effort that needs to be made by the government to close the weaknesses in financial management and accountability that continue to recur every year. Dato' Indera Speaker, regarding the performance of development project implementation under the Twelfth Malaysia Plan (RMK12), namely for the period 2021 to 2025. Until 31 December 2024, it was reported that there were a total of 157 delayed or sick projects involving 18 ministries, of which KPM recorded the highest number of sick projects, totalling 46 projects. Followed by KKDW with 34 projects, PETRA with 12 projects, KPT with 11 projects and so on. What is even more distressing is that there are four sick projects with a physical delay percentage exceeding 20 per cent that have obtained two to 10 certificates of delay and extension of time (EOT) within an EOT period of up to 785 days. Is this failure due to delays in procurement, or unrealistic planning, or weaknesses in supervision on the ground? This matter has indirectly raised questions about the effectiveness of coordination among implementing ministries, technical agencies and the Ministry of Economy. I am of the view that the government needs to find a way to put an end to the problem of delays in government projects, especially those caused by weaknesses on the part of contractors or developers. If no decisive or drastic action is taken regarding this problem, this weakness will certainly

hamper the development process that has been planned by the government for the benefit of the people and the nation. Firm action must also be taken against contractors or developers who fail to carry out the responsibilities and trust that have been entrusted to them. I propose that the contracting companies or development companies involved be blacklisted by the government and have their business licences revoked. I also propose that a Special Committee be established by the government to monitor all developments of sick projects under the Twelfth Malaysia Plan. It is my earnest hope that the journey of RMK13 for the period 2026 to 2030, which was tabled on 31 July 2025, will not be tainted by these problems of delayed or sick projects. Next, Dato' Indera Speaker, this LKAN this time also reports on the collection of revenue from the sale of vehicle registration numbers by the Road Transport Department (JPJ), Ministry of Transport, regarding inactive registration numbers that have not been offered to the public. Based on audit review data submitted by the Digital Technology Division of JPJ, there were a total of 375,792 inactive registration numbers still unsold as of 2024, and I am confident this figure will continue to increase from time to time. This problem has been found to have caused significant losses to the government, namely at least RM112.73 million if these registration numbers were sold at the minimum price of RM300. This shows there is internal control leakage in the mySIKAP system and weaknesses in monitoring at the JPJ level. If referred to Table 6, inactive registration numbers unsold as of 2024 in LKAN 3/2025 page 96, the Federal Territory of Kuala Lumpur recorded the highest total at 98,910, followed by Johor with 49,851, Putrajaya with 45,467 and so on. On this occasion, I would like to seek an explanation as to why this matter could happen and was allowed to continue by JPJ over such a long period? I urge that the online system known as e-Baki for vehicle registration numbers be expedited by the government.

Furthermore, the public is aware that there are many complaints from the people regarding the existence of "number worms", individuals and syndicates who attempt to reap profits out of thin air through the resale of vehicle registration numbers on

various mediums and on various social media platforms. Is this practice permitted under the law? What efforts is the government making to prevent this "number worm" phenomenon, so as to give justice to the public in obtaining their favourite vehicle registration numbers through the eBid system? If this problem cannot be contained by the government, I think the objective of the JPJeBid system, which aims to facilitate the bidding of vehicle registration numbers, will go far off course. Dato' Indera Speaker, this LKAN is not merely a financial report. This report is a reflection of the government's accountability to the people and of governance. Accountability is not merely a slogan, but must be demonstrated through action. As long as leakages, project delays and weak revenue management continue to occur, the people's trust in government governance will continue to erode. That is all from me for now. I hope that all the views and questions raised just now will receive the attention of the government. Thank you, Dato' Speaker.

Thank you, Honourable Tampin. Next, Honourable Machang.

Thank you, Mr Speaker. I would like to welcome the teachers and students of MRSM Parit, Perak. [Applause] Welcome. Mr Speaker, in the long history of the governance of a nation, only one principle distinguishes a government that is blessed from one that is destroyed, namely integrity in governance. When power is exercised without integrity, corruption is no longer a crime, it becomes a culture. When trust is neglected, the revenue of the nation is no longer the people's livelihood. It becomes the spoils of a select group. That is the essence of the Auditor General's Report 3/2025 that we are debating today. This report is not merely figures or financial tables, it is a mirror that reflects the true face of the Kerajaan MADANI government today. Mr Speaker, the Auditor General's Report reveals a pattern of systemic and recurring weaknesses in the Kerajaan MADANI government. Federal debt now reaches RM1.24 trillion, equivalent to 64.6 per cent of GDP (KDNK). Total liabilities of the nation rose to RM1.57 trillion. RM44.5 billion in revenue has yet to be collected, half of which has been outstanding for more than six years.

Among the things I see that the government can improve is how we lose tax collection from smuggled goods. I have just returned from Kenya together with the Honourable Subang Jaya and colleagues from the Members of Parliament of the Special Select Committee on International Relations and International Trade. In Kenya there is a company started by a Malaysian, which has been given the responsibility of monitoring the customs system in East Africa, Kenya, Uganda, Tanzania and so on. And as a result of this efficient monitoring system, the countries of East Africa have succeeded in increasing tax collection by 20 per cent. Because there is good monitoring and good governance, they have no leakage in terms of smuggled goods. I am confident that if the Kerajaan MADANI government has the courage to take more reformist steps, and introduce this same system in our Customs Department, I am confident that this leaking tax collection, this leakage, we can turn it around and use it to cover the fuel subsidies we introduced recently. What does this mean? The losses from contraband and any other goods that flow into the country is massive. Why? Because there is no proper monitoring by the Ministry of Finance. So we can help to strengthen this Auditor General's Report for the next session, if we bring this initiative forward. 8,755 development projects under RMK12, yet nearly 10 per cent failed or were completed late, and the government failed to collect penalties of RM54.5 million from vehicle concession contractors. These are not random figures, this is proof that the fiscal governance of this government is lax, undisciplined and unaccountable.

Machang, may I ask...

Please, Kota Bharu.

I am interested in what the Honourable Machang has said, the hope that the government will take serious steps to overcome the problem of leakage and so on. I observed that in August this year, the Honourable Prime Minister made a statement that the Kerajaan MADANI is committed to eliminating cartels and firmly combating smuggling and corruption. So, in the Honourable Member's observation, has this step been taken now? These cartels and corruption. Thank you.

Thank you, Honourable Kota Baharu. Include his speech in my speech.

I think this matter has not been resolved. That means the reform trumpeted by Tambun has not been fully completed. Let me give a simple example. Pandan, ha, alhamdulillah, Pandan is here. Pandan has already issued a warning in this House regarding the former Political Secretary of Tambun, who was recently reported in the newspapers as having obtained a new contract to supply passport and also IC issuance for us, yes. Is there — how was the open tender carried out within the Ministry of Home Affairs (KDN) and so on? Has that been answered? Pandan also alleges that this individual could become a liability to the Kerajaan MADANI government because he behaves like Jho Low. This is a matter that I feel the LKAN must look at, given Pandan's warning. Those within the Kerajaan MADANI government understand it better than we who are outside. So, I hope this is taken note of. Mr Speaker, there are many issues involving the interests of the people, but there are also many that are not picked up, audited and reported by the LKAN to us. Among those I regret were not included in this report is the privatisation of MAHB. The Kerajaan MADANI promised that with new partners such as GIP and BlackRock, which is pro-Zionist, our airports would be managed better. But look at what happened a few months ago with our aerotrain? PESTECH was given the same contract, and failed several times. Airports in Sabah, where Beluran reported leaks, what else is there, due to various maintenance works that were not done properly. So we do not see, the people do not see, where the logic and added value, with respect, of the privatisation of MAHB to the Zionist BlackRock and GIP helps to facilitate the upgrading of our national airports. Why did the LKAN not bring this matter into the report? Because you promised the people that it would help, but in reality it does not help. This report also explains the glaring weaknesses in the governance of the Ministry of Home Affairs in the security project at Pulau Mabul, which was delayed by nearly 10 years. The way workers at the site behave and the weak control over contractors. We are worried, the people are worried, that with this kind of attitude, it may also affect many other projects under KDN. Today, we were shocked by the report issued by FIFA regarding the forgery of documents of naturalised players. I do not blame the people who provided the identification and proposals. We have done this before, Sumareh, Mat Don, all passed without problems, but why did JPN

allow forged documents to be submitted to FIFA? This is an embarrassment to the nation, Malaysia's dignity has been tarnished. So, what weaknesses do we need to look at in KDN that are being pointed out? These are among the things I see that are reflected in the LKAN, there is a glaring weakness in KDN with regard to governance. So, I ask that this Auditor General's Report be improved, and we must ensure that every single sen spent truly reaches and benefits the people, not cronies. Thank you, Mr Speaker.

Thank you, Honourable Machang. Next is the Honourable Pasir Gudang, but I see that the Honourable Pasir Gudang is not in the House. I now move to the Honourable Temerloh, eight minutes.

Thank you, Mr Speaker. I stand to represent the voice of the people and Perikatan Nasional to express serious concern over the findings in the Auditor General's Report 2025, which clearly show marked weaknesses in the financial management of the nation by the Federal Government today. First, the collection of revenue from vehicle registration numbers, the Ministry of Transport concerned. Mr Speaker, what has happened under the Ministry of Transport is very disappointing. Thousands of vehicle registration numbers, including special numbers, were auctioned, but the proceeds were not collected from 2022 to 2024. According to the audit report, RM115.96 million in national revenue was lost just like that, due to a loose bidding system, no monitoring, and no enforcement mechanism. More than RM15 million, that is 15 per cent of the proceeds from vehicle registration number bids, was not collected due to weak enforcement and no strict monitoring. As much as 20 per cent of the numbers that were auctioned were not redeemed, causing losses amounting to millions of Ringgit to the nation. I would like to ask why this system was not accompanied by a mandatory deposit or advance payment as practised in other countries? Is there any interference by interested parties in this vehicle registration number bidding system? And more importantly, who will be responsible for this loss of revenue? Second, the management of government vehicles. Concessions of the Ministry of Finance. The government has also failed to manage official vehicle assets prudently.

The report shows that the government has paid in full to concession companies for vehicles that were not maintained, were not used, and some had already expired. Based on the audit calculation up to 31 December 2024, it is estimated that RM54.51 million in penalties could have been imposed on the concession companies for delays in supply. Likewise, the estimated loss of RM28.79 million on vehicles whose leasing period had expired. The audit found that the government paid more than RM25 million a year, about 18 per cent of the annual contract value, to concession companies even though many vehicles were not used and maintenance was not carried out according to the contract. My question is, why were payments continued even though the performance of the concession companies failed? Who are these concession companies? Are they political cronies or individuals who obtained projects without real capability? And will the Ministry of Finance re-evaluate this agreement or simply allow the people's money to be wasted? Third, infrastructure projects of the Ministry of Works. Mr Speaker, when we look at the infrastructure projects under the Ministry of Works, there is clearly project delay, non-compliance with specifications, and payments made even though the work is incomplete. Furthermore, payments worth RM50 million were made even though the work was incomplete or not according to specifications. I want to know, who approved full payment to the contractor when the work was not finished? Was any firm action taken against contractors who failed to meet the requirements and caused the waste of RM50 million? What does that mean? This is not merely a management weakness but a planned waste that enriches contractors while burdening the people. I would like to ask further, are contractors who fail blacklisted or do they still get the next projects? Where is the technical supervision of the ministry? Did the project controlling officers turn a blind eye? Fourth, the unclear strategic plan of the National Audit Department. Most worrying, the National Audit Department itself, which we hope will be the eyes and ears of the people, still does not have a robust and comprehensive strategic plan. This is because in March 2021, the former Auditor General approved the National Audit Department's strategic plan for 2021, based on four strategic pillars to drive the direction of the National Audit Department. The question is, has there been no amendment to the National Audit Department's strategic plan? Is the national strategic plan aligned with the current KPIs of the Auditor General?

Mr Speaker, if the national audit body itself has no direction and no clear performance indicators, how can they assess and investigate other ministries and agencies? I would like to ask, does the government provide sufficient allocation and capacity to the National Audit Department, or is this deliberately done so that they remain weak and unable to investigate in depth? And who monitors the effectiveness of the National Audit Department itself? Fifth, the troubled projects of the Ministry of Rural and Regional Development, FELDA and FELCRA. Delayed infrastructure projects have caused FELDA and FELCRA settlers not to receive the benefits they should. Even more worrying, FELCRA failed to pay dividends on time to its shareholders, causing income losses to more than 10,000 settlers with accumulated delayed dividends of more than RM12 million. I would like to ask, what is the cause of the failure to pay these dividends which has affected the settlers' income? What steps has the ministry taken to ensure that the outstanding dividends are paid immediately? Sixth, the Ministry of Housing and Local Government. The audit found that more than 25 per cent of public housing projects were delayed, causing more than 3,000 housing units worth RM450 million to be abandoned and failing to be handed over on time. There were also weaknesses in land management at the local government level that contributed to land wastage and the failure to implement projects. I want the ministry to explain how the ministry intends to resolve the issue of delayed projects involving this RM450 million? What firm action will be taken against land management and failed contracts? The Ministry of Education, the seventh. In the education sector, an allocation of RM200 million for rural school development was not distributed efficiently, causing a shortage of facilities in more than 150 schools. School construction projects also experienced delays of up to nine months, affecting the learning process. I would like to ask what the ministry's plan is to improve the management of this RM200 million allocation so that it reaches the schools that need it. How does the ministry ensure that school construction projects are completed on time? Finally, Mr Speaker, what we see in this 2025 audit report is a reflection of the failure of the coalition government's administration today in safeguarding the people's trust. National revenue is leaking, projects are late, government assets are mismanaged,

and oversight agencies are not fully functioning. The people are suffering, yet financial leakage continues without firm action. As a representative of the people from Perikatan Nasional, I demand a comprehensive investigation into all audit findings, firm action against officers and contractors who failed, and the government's commitment to restructure the internal control system so that no more people's money is wasted so carelessly. The government must remember, every sen that is lost is the people's right, and we here will continue to speak up as long as the misappropriation is not corrected. That is all, thank you.

Thank you, Honourable Temerloh. Next, the Honourable Jelutong, eight minutes.

Thank you, Deputy Speaker. First, before I begin my debate on the Auditor General's Report, as a representative of the people of this country, I would like to record my congratulations and pleasure at being informed that 23 activists who went on the Global Sumud Flotilla voyage will return to the homeland tonight. [Applause] And, we also record our appreciation to the Honourable Prime Minister and the government's line-up, the ministers who succeeded in ensuring that all of them returned safely to our homeland. This is a recognition of the leadership of the Honourable Prime Minister in successfully handling the problem and ensuring that all Malaysian citizens who went to Palestine returned safely.

Turning to the Auditor General's Report, I would like to touch on several matters, especially regarding the reports made by the Auditor General on the ministries. I accept the Auditor General's Report with good grace and also thank the government because this Auditor General's Report is not merely tabled in Parliament but is also given space and opportunity for us to debate the Auditor General's Report, so that we understand what the shortcomings and leakages are that we can rectify and address in the future. So, I listen to the criticisms thrown out by the opposition over there regarding various matters, but what we need to see is that in the government as it is now, we are given an opportunity. If

I am not mistaken, Deputy Speaker, this is the third or fourth time we are debating the Auditor General's Report in this honourable House. The government's transparency and openness in debating the Auditor General's Report shows that the government has sincerity and an open heart to receive various criticisms, not only from over there, but also from this side, so that we can overcome any shortcomings or leakages and improve the shortcomings or leakages in the future. Without the Auditor General's Report, I believe we would still be plagued by the same problems. But with the Auditor General's Report, with the opportunity given to us to debate the Auditor General's Report, we are given a better opportunity to strengthen government services, to ensure that the ministries take lessons from any shortcomings, leakages or the needs of the people, where these needs must be given attention from time to time. I see, for example, the Auditor General's Report regarding tax collection, revenue from various activities. Here I would also like to state that this Auditor General's Report has covered various matters, and I was also interested in the Auditor General's Report regarding the collection of revenue from the sale of vehicle numbers. Recently, I would like to draw the attention of this honourable House, we thank the Minister of Transport who made a shocking disclosure regarding luxury vehicles that were purchased but did not pay road tax, and I read the statement made by the Minister of Transport. I understand these are the breakdowns given. There are a total of 345 Rolls-Royce vehicles owned by individuals and VIPs. The total road tax not paid is RM6.4 million. There are 372 Lamborghini vehicles owned by individuals in our country, the total road tax not paid is RM3.7 million. There are 660 Bentley vehicles owned by individuals. The total road tax not paid is RM7 million. There are 675 types of Ferrari vehicles, road tax not paid is RM4.7 million. There are 4,308 units of Porsche vehicles, road tax not paid is RM13.7 million. The question is how the Road Transport Department allowed these vehicles to be registered and used in our country without paying any tax? So, I was interested in the disclosure made by the Minister of Transport. I mention it because although the Auditor General's Report

will not touch on this matter, the Minister of Transport made this startling disclosure during one of the recent lengthy sittings. So, I would also like to draw the attention of the ministries and enforcement agencies to ensure that action is taken against these vehicle owners. I also take this opportunity to appeal to the Ministry of Education not to forget the projects involving Tamil schools that are still incomplete. I come from Pulau Pinang, Deputy Speaker, and every time I stand up, I still remind this august House not to forget the Sekolah Jenis Kebangsaan Tamil Sungai Bakap in Pulau Pinang, which is still not completed, because the promise made by the Deputy Prime Minister I during the Sungai Bakap campaign last year was that this school would be built and completed before the next general election. At the same time, in the opportunity given to me, I also wish to raise here and remind this august House and the government of the problems faced by Sekolah Jenis Kebangsaan Tamil Ladang Jeram in Pahang and Sekolah Jenis Kebangsaan Tamil Ladang Katumba in Kedah, where these schools are still facing problems and need attention because I believe these schools are among the schools or projects listed under the Ministry of Education Malaysia that are stated in the Auditor-General's Report. Thank you for the opportunity given. Greetings of unity, greetings of Malaysia MADANI.

Thank you, Honourable Jelutong. Honourable Members, yes...

Dato’ Yang di-Pertua, with your permission. Before Tumpat speaks.

I would like to extend a warm welcome to the teachers and approximately 48 students...

Yang Berhormat.

...From Sekolah Menengah Jengka 6 Maran, Pahang. [Applause] Thank you.

Yes. Honourable Member, the Standing Orders do not allow the Honourable Member to do so. I think the Honourable Member should have discussed it with the Honourable Member for Tumpat in order to welcome them. I recall that the ruling was given by Tan

Sri Speaker. But never mind, I will allow it, but do not do it again in the future. Honourable Members, before I call the Honourable Member for Tumpat, I ask for the goodwill of Honourable Members. I do not prevent Honourable Members from interacting in the House, but if I am here and I still hear the details of Honourable Members chatting or interacting, I think that disturbs the House. I ask for the cooperation of Honourable Members to ensure that debaters are not disturbed by the rather loud voices of Honourable Members, to the extent that I can hear them from here. I hope the Honourable Member understands, yes. We must respect when Honourable Members are debating. Please, I invite the Honourable Member for Tumpat.

Peace be upon you, and may the mercy and blessings of God be upon you. Thank you, Mr Speaker. This series of Auditor-General's Reports raises several cross-ministry issues concerning value for money, asset governance and the effectiveness of policies. I focus on six ministry clusters in line with the interests of the people of the East Coast and also the nation. And I also welcome, God willing, the return of the delegation from the Sumud Flotilla, which will arrive tonight, and that is a relief. On behalf of women, I congratulate all the women involved in the Sumud Flotilla who have stood up for the people of Gaza in Palestine. The first relates to the Ministry of Transport. Vehicle registration numbers and the direction of national mobility. What is the government's current policy in balancing short-term revenue objectives, such as collections from the special registration numbers, with the long-term objective of low-carbon mobility? What is the current focus that de facto encourages [Inaudible] individuals rather than strengthening mass public transport? I ask for a specific explanation regarding the audit findings on the amount of additional revenue, the number of cases resolved by the Special Registration Number Committee, the membership list and the administrative cost of the committee. This touches on the need, transparency and the relationship between cost and benefit to the people. The second relates to vehicles as well, namely the Malaysia-Thailand cross-border charges. We find that during the recent holiday, more than 100 million has been

spent by Malaysians in Thailand, and most of them entered using vehicles. What is the payment structure for Malaysian vehicles entering and leaving at the border, and does the government intend to conduct a review of rates and cross-agency data sharing to close leakages and ensure that we also obtain revenue from cross-border trade of Malaysian and Thai citizens, because we see today that it is happening only one way, not two ways.

The third, vehicles under government concessions. The rental and maintenance costs of concessions reach RM1.750 billion, requiring an assessment of value for money. How many companies are involved, how many vehicle units? What is the cost-benefit analysis compared with the option of direct purchase or a hybrid hire-purchase? Because we see that these costs are very high in amount. The second relates to the Ministry of Works, namely the status of the 33 highways in Malaysia. What is the status of the East-West Highway? Is it true that it is no longer under highway status? And if it is still a highway, what is the maintenance allocation, especially as we see that it needs major improvement and maintenance because it involves the economy between the East Coast and the West Coast? I would also like once again to touch on, when mentioning this highway, the need for the people of the East Coast to wait for LPT3. Whatever audit we conduct is for the good of the people. So, if this audit is unable to provide a finding stating that the need for the East Coast Highway is something important, because it not only resolves mobility issues, but also serves as a means of flood mitigation and safety along the entire alignment, especially during the current monsoon season. The next relates to the Ministry of Home Affairs, namely the costs of treatment and public health relating to PATI. We have been informed of several costs related to treatment for PATI. My question is whether the accounting of vaccination and advocacy costs involving PATI women and children is also audited? Is it included in public medical accounts? State the expenditure costs, the number of recipients and the key health outcomes. Today we see that with many PATI and also migration, there is a high number of TB cases. Do we see the need for a special audit regarding the entry of immigrants who have no vaccination records

from their countries of origin, as well as cross-border action taken together with the MOH? Because we need these figures, as they require targeting rates and direct coverage in the short and long term for our citizens and also for these PATI. Likewise, we see how the government, in conducting an audit on this matter, needs to look at a structured health education plan to screen risks, early screening and health literacy for immigrant communities as well as at-risk local communities. In this matter, do we cooperate with local or foreign NGOs and obtain foreign funding? To what extent are the MOUs with local and international NGOs to bear the costs of vaccination? Because we know these costs are high, and previously we were informed that only Qatar helped Malaysia in this effort. Regarding maritime and border assets. We see that most of the costs spent by the government, covering 61.7 percent, are for ships that are more than 30 years old. So, what ― we want to ask the government, what is the viable number of years for these ships to be maintained and their model? Because we see that it has a major impact on the country in terms of our policy on the economic life of assets and the phased replacement plan, especially involving maritime matters. I would also like to ask how many patrol boats operate along the East Coast, and the level of readiness, especially to monitor the current monsoon season? Regarding the Ministry of Foreign Affairs. I see that a substantive audit has been carried out for missions in Australia, Vietnam, Singapore and New Zealand. I want to state some matters that were raised by the staff there themselves, including whether we have a policy to ensure that support staff, such as cooks, must be brought from among Malaysian citizens so that cost-effective placement guidelines do not compromise the quality and authenticity of our country's original and official food. Second, the right to work for officers' spouses. If it is the wife, perhaps it can be. But what if the officer is a woman? Will the husband also get the flexibility for them to be able to work overseas to accompany the wife? Third, to ensure that any materials displayed in any embassy office must represent the diversity of states in our country and reflect Malaysian identity. We see that when we go to

there, there are many old photographs that have not been updated, and contributions from various states are actually needed for the benefit of these ambassadors. Next, in terms of the budget for monitoring and renovation of embassy buildings. Many embassies we visit, we see many that leak, requiring assistance from the government to ensure our country's image is good in the eyes of the world. Because we are in fact a nation that cares for our staff, whether at home or abroad. Next, relating to the Ministry of Education. We see a six percent increase for the Early School Enrolment Aid and the food and beverage allocation so that it is in line with current cost needs. However, we see that in terms of promotion of local healthy food, it is not managed. Advertisements and the opening of fast food chains are increasingly rampant. So, based on this audit, the policies between ministries and the private sector must be comprehensive. They must ensure healthy menu standards among children in mass media and also in practice in terms of responsible advertisements for children and incentives for local healthy food suppliers. Second, what is the budget allocated by the government from this audit report so that ― for example, the National Institute of Health, so that they can provide health education to prepare research on school nutrition intervention and family food education plans. And third, we see that not only outside but also in Parliament itself, the food sold at the cafeterias and canteens does not reflect healthy food. Because, for example, when asking for fruit juice, what is given is instant fruit juice, not organic fruit juice. So, this is the most important and there needs to be traffic light labelling so consumers are aware of the risks. And the last relates to the Ministry of Women Development. We see there is a subsidy for childcare centre fees. However, we see that the figure presented is 5.6 million, which appears too small compared with the actual needs of working women or working families. We request a review of this audit so that priority and an increase is given to this subsidy, because we do not want ― currently the government only gives, only one child per couple. It should cover all children because all of them need care.

And we need ― yesterday there was discussion on the report from the Women's JKPK on the need for an agency and also a national childcare academy with a scale of standard caregiver training that can produce caregivers at a high rate. Because, whatever the findings of the audit, it is for the country in the long term. That is all, thank you.

Thank you, Honourable Tumpat. Honourable Pasir Gudang, eight minutes.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you, Mr Deputy Speaker. Peace be upon you all and greetings of well-being. Thank you for giving Pasir Gudang the opportunity to also debate the Federal Government Financial Statement 2024. I would like to congratulate the courage of the Federal Government, which not only tables this report before us, but we also debate it. What we are doing now is a process of checks and balances involving all opposition and government Members of Parliament, like a doctor conducting a post-mortem. This is the expenditure for 2024 that this Parliament approved in 2023. Second, I also welcome and congratulate the government because the 2024 Financial Statement was tabled in accordance with the Public Finance and Fiscal Responsibility Act 2023. So, it seems that we are on the right track in national financial management. Mr Speaker, I would like to present only one matter, namely pages 19, chart 4 and chart 5 on the Federal Government Financial Statement 2024, which is the breakdown of Federal Government revenue. In 2024, Federal Government revenue increased compared with the previous year, 2023. In 2023, there was RM314,959 ― RM314 billion more, but in 2024 it increased to RM324.6 billion. This is very, very good. It means revenue has increased and what clearly increased is tax revenue.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

So, in relation to this, it is no secret in our national budget that since 1974, the national petroleum company, PETRONAS, has contributed tens of billions every year. I have the figures here. Since 1974 until

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

now, it has been reported that a total of 403.3 billion has been contributed by PETRONAS to the Federal Government for the annual budget. For example, in 2008 alone, 67.6 billion was contributed. In 2008, 44 percent of the country's revenue for that budget came from PETRONAS. So Mr Speaker, I looked at this financial statement, this thick one, and there is no mention of PETRONAS at all. If there is, perhaps the Minister can show me which page. I would like to ask, for the Federal Government Financial Statement 2024, how much dividend did PETRONAS give to the Federal Government for the national budget of 2024? This year 2025, how much has PETRONAS given? Minister, please share. This is not OSA. This is us telling you. I say this because of my concern about the fate of PETRONAS as a national petroleum company, which in Malay is said to be like, "the goose that lays golden eggs." Contributing to help us. Not for Malaya, not for the Federation of Malaya, but for Malaysia as a whole, and we distribute it in this budget to all states and territories in Malaysia. What I am worried about is that it has now reached the court. A dispute in terms of — in court between PETROS, the Sarawak Petroleum company, and PETRONAS. This is like a sibling dispute in a family, two companies. So, this matter is ongoing, currently at the Kuching High Court and I do not intend to go further on that matter. This question is not only a legal question. This concerns federalism. It means if we do not handle this properly, it will affect the position of PETRONAS. It means now we must think. We understand the powers of the states under this federalism, but we must also think about the national sustainability as a nation-state, a country. What I hope, it means in this Parliament, I ask that the Prime Minister as Minister of Finance disclose to Members of Parliament what agreement or declaration has been reached by the Prime Minister of the Federal Government with the Premier of Sarawak concerning the position of PETRONAS and PETROS, for the information of all Members of Parliament here, so that together we bear it and together we resolve it. It cannot be that matters which

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

concern a company so large that has served this country are involved by only two individuals. It means, I think the OSA is not applicable in this. Parliament passed the PDA, the PETRONAS Act, so this Parliament has the right to have access to the agreement of the two leaders, the Federal Government and that state government. Thank you, Mr Speaker.

Thank you, Honourable Pasir Gudang. Honourable Jempol, eight minutes.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. And also greetings of MADANI Malaysia. I thank Mr Speaker for the opportunity given to me to take part in debating the Auditor General's Report Series 3/2025, which set out important findings to serve as a guide for the MADANI Government today. Mr Speaker, I am concerned because the matter I wish to discuss involves aspects of national security and sovereignty. That was my initial reaction after studying and scrutinising the Auditor General's Report findings on the reality of the Forward Operation Base project on Pulau Mabul, Semporna, Sabah. The failure of the contractor company to complete the project, which was approved under the Second Rolling Plan of the Eleventh Malaysia Plan, is feared could jeopardise the operational commitments of the East Coast Sabah Security Command (ESSCOM) personnel, who are mandated to safeguard the East Sabah Security Zone, namely ESSZone, since its establishment in 2013. Mr Speaker, the major question I wish to raise in my debate is what comparative advantage company 762935-D had over the 16 other contractor companies that were also on the list of applicants for the pre-qualification open tender? What was the justification and the original evaluation basis made by the procurement board on 11 August 2020, such that it could approve the appointment of an implementing entity which later had to compromise on work discipline due to financial problems?

The shortcomings of the FOB project have indirectly created a domino effect on the smooth running of ESSZone control operations, which constantly face various challenges and scenarios requiring the alert readiness of ESSCOM. The commitment to curbing maritime crime, which takes many forms, requires not only efficient and effective operational management but is also driven by the state of working infrastructure and the conducive living environment of the personnel. Mr Speaker, hypothetically, the delay of the FOB project, which was due to be completed on 16 November 2024, could to some extent disrupt the ESSZone control operation plan, which of course involves the need to station personnel — a number of ESSCOM personnel. The matter of stationing ESSCOM personnel is an important issue in maritime security affairs, given that the ratio of personnel to threat risk must be taken into account in finalising the deployment of personnel without neglecting their welfare. That is why Jempol chose the FOB on Pulau Mabul as the subject of debate, the title of my debate, because it involves an aspect that is very important for the security and sovereignty of our nation. Moreover, the company's failure to achieve the percentage of work completed according to the work programme has created a liability for the government, which has had to bear an increase in the project's ceiling cost of RM28.7 million. The increase in the ceiling cost may have long-term financial implications for the Ministry of Home Affairs, which must make the best use of every ringgit of development allocation according to the planning designated for each project. Mr Speaker, therefore, every party involved in making the FOB ESSZone project on Pulau Mabul a success must take the audit recommendations submitted in the LKAN as constructive criticism for proceeding with the remaining balance of the project that must be completed on schedule. Audit recommendation 7.6 concerning the appointment of the completing contractor must be emphasised by the government so that the credibility of the company to be selected is truly assessed rationally and without prejudice. In conclusion, Mr Speaker, I hope that all development plans, as I mentioned earlier, specifically in the east coast of Sabah and in all the states of our country, can be continued in a more orderly manner hereafter, regardless of who takes on the mandate as administrator. What is important is the credibility and integrity

of leadership that not only prioritises the prosperity of the state but also gives importance to the welfare of the people. So, Jempol congratulates the LKAN on this report and also the government for its courage: we are debating the Auditor General's Report in this august House to ensure that governance, especially in procurement processes, truly runs in accordance with the course set by the regulations that have been laid down. So with that, that is all the debate from Jempol. Thank you.

Thank you, Honourable Member Jempol. Honourable Members, the time has shown 1.02 pm, the House will be adjourned and will resume sitting at 2.30 pm.

[The meeting was suspended at 1.02 pm]

[The meeting resumed at 2.30 pm]

[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

[Reciting prayer] In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and good afternoon, Honourable Members. I am pleased to inform you that with us in this august House is a delegation from the National Assembly Service Commission of Nigeria, led by Honourable Saviour Enyiekere, Executive Chairman of the National Assembly Commission of Nigeria, together with his delegation. [Applause] To Honourable Saviour Enyiekere and the delegation, this House welcomes your presence and your arrival in this Honourable House. May the presence of you and your delegation further strengthen the ties of friendship and relations between Malaysia and Nigeria. Honourable Members, we resume our debate, and as I have been informed, the following is invited: the Honourable Member for Jerlun to debate, eight minutes.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah.

Mr Speaker, the Federal Government Financial Statement 2024, as reported in the Auditor General's Report (LKAN) Number 3 2025, Jerlun wishes to touch on only two issues. The first issue is financial liabilities, and the second issue is Accounts Receivable of revenue (ABT). The first issue, financial liabilities. Jerlun finds that the government's liabilities for 2024 amounted to RM1.578 trillion compared with RM1.492 trillion for 2023. Of these liabilities, the debt of the Federal Government for 2024 amounted to RM1.248 trillion compared with RM1.13 trillion for 2023. There was an increase of RM0.075 trillion or 75,000 million compared with the other liabilities. My questions here are firstly, to what extent, and which sectors, prompted the government to have to borrow to finance them? Secondly, are these loans for previous development expenditure, whether under the RMKe-11 or RMKe-12, that have not yet been fully implemented, or for recent projects such as the construction of Kota MADANI, if government funds are used, or for settling accrued debt arrears? The second issue is Accounts Receivable of revenue (ABT). In 2024, revenue ABT amounted to RM44.554 billion compared with RM39.515 billion in 2023. Within just two years, this revenue ABT increased significantly by RM5.039 billion, or 12.8 per cent. This report also mentions the three highest ministries contributing to the 2024 revenue ABT, namely, firstly, the Ministry of Finance (MOF) amounting to RM43.485 billion or 97.6 per cent. Within MOF, the Inland Revenue Board of Malaysia (LHDN) is the highest at RM40.389 billion. Secondly, the Prime Minister's Department (JPM) amounting to RM463.21 million or 1.0 per cent, of which the Public Service Department (JPA) had revenue ABT amounting to RM352.52 million. Thirdly, the Ministry of Health Malaysia (KKM) amounting to RM358.89 million or 0.8 per cent. In this regard, I refer to a statement on the Prime Minister's Office portal dated 6 March 2025, entitled, "Investigate Individuals, Companies Evading Tax." PM Anwar. The Prime Minister said, "As long as I am entrusted to lead the government, I want the people, whether small traders or the super-rich, to submit to the law and not escape paying income tax. I give this call so that no one thinks whether he is my acquaintance or not, my supporter or not, tax must be paid and the Inland Revenue Board must search and look for tricks, namely tax evasion." My question here is, who is meant by the super-rich by the Prime Minister?

Secondly, has the Inland Revenue Board tracked down and searched the homes or offices of these super-rich who refuse to pay tax? Thirdly, does the Inland Revenue Board blacklist taxpayers who refuse to pay tax arrears or current tax so that they have no access to borrow from financial institutions? I give the example of the Road Transport Department (JPJ) which has blacklisted vehicles that have been summonsed for road offences before renewing road tax; the summons must be paid first. Then you must show the summons payment receipt at the counter, and only after that is road tax allowed to be renewed. This affects vehicle owners. So I feel the Inland Revenue Board could take similar steps as the Inland Revenue Board, namely blacklisting taxpayers, whether those taxpayers are among individuals or big company towkays.

Regarding LHDN, I have received a complaint from a housing company in Kedah. I will state its name clearly: AIMA Development Sdn. Bhd., whose overpaid tax to LHDN for 2023 amounted to RM580,742. Its Executive Chairman sent an email demanding a refund from the Inland Revenue Board. Unfortunately, the Revenue Collection Department of LHDN informed that the application had been frozen and was subject to guidelines by the LHDN management. The company only received RM27,827.23 on 24 April 2025 recently, and the balance of RM552,914.72 has not yet been paid. The question is, why has this refund been frozen? Why must there be guidelines for refunds to taxpayers? So, I request that this issue be resolved as quickly as possible. Yes, it is better to track down those who do not pay tax rather than delaying taxpayers who have already overpaid, who should be refunded. Returning to ABT, Accounts Receivable. More revenue that should have been received by the government has still not been collected or settled in that financial period. Low revenue collection shows there are still weaknesses in revenue management and the collection process at certain agency levels, especially in the tax collection and service revenue systems. It affects the government's cash flow because revenue that should have been received does not enter the current account.

In this report, the National Audit Department (JAN) has made its recommendations. Its recommendation is that the mechanism for collecting the various revenue ABT arrears must be strengthened so that collection or adjustment is carried out immediately to avoid write-off. Write-offs of various revenue ABT exceeding a period of six months alone amounted to RM337.14 million. Finally, on this occasion, I wish to ask the government. Following the recommendations submitted in this Auditor General's Report, firstly, what enforcement mechanisms have been taken to increase revenue ABT? This is not only for Federal Government agencies but also includes state government agencies. And secondly, state the latest achievements of the revenue collection status after this reprimand was made by the National Audit Department, especially for the three ministries that were explicitly mentioned in this report. Thus, Mr Speaker, thank you. Peace be upon you and the mercy and blessings of Allah.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Jerlun. Next, I invite the Honourable Member for Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Mr Speaker, for giving Bayan Baru the opportunity to debate the Auditor General's Report 3/2025. I am proud that we can debate the Auditor General's Report because, since before, I have been in Parliament for 15 years. All this time, the Auditor General's Report was never debated at all, and we saw before, we got piles of reports, high, but the people did not know, and most of the leakages and the improper— corruption and so on could not be known by the people, and this is the courage of institutional reform. Where in the end we can get accountability and answers from the government for all the leakages that occurred...

Bayan Baru.

Tuan Sim Tze TzinPKR · PHBayan Baru

Ya.

Can you be a bit briefer?

Tuan Sim Tze TzinPKR · PHBayan Baru

Silakan.

Okay. Bayan Baru, I still remember, I think two years ago or three years ago, when the side over there firmly refused to debate the LKAN, but I see now they are also eager to debate the LKAN. So, does this show that they themselves acknowledge that what the MADANI Government has done is the right thing?

I agree, because for what is good we must have the courage to implement it so that no one is corrupt, the government achieves accountability, and this proves the MADANI Government is moving in the right direction and we are implementing our words and also our manifesto. And I congratulate Tan Sri Speaker and also the Leader of the House, the Honourable Prime Minister, for starting the tradition of debating the LKAN report. This is a— it brings a new breath, including to the Deputy Speaker. Deciding to debate the Auditor General's Report, and this brings a new breath into Parliament, towards accountability, transparency and accountability. And this— that is why we are getting a better financial position because we see that all these institutional reforms are bringing results. For example, federal debt has been controlled, the growth of debt has decreased from 11.4 per cent in 2021, now only 6.4 per cent in 2024. So, the deficit too. In 2023, five per cent financial deficit, but in 2024 the projection was 4.3 per cent, but we succeeded in reducing it further from 4.3 per cent to only 4.1 per cent. This is an achievement. In a better fiscal position like this, the government can actually benefit the people because more can be given to the people. Because we succeeded in transparency, accountability and also better check and balance, there is surplus money. That money is returned to the people. For example, the government can now give SARA, RM100 every month to B40 families. Yes, they can get RM100 every month. This greatly helps small families who are struggling in rural areas and also in towns. Not only that, the government has announced RM100 for every Malaysian. Yes, regardless of whether rich or poor, they can get RM100 for each person because the fiscal position, the government's financial position, has been improved. And the most remarkable is that the government can provide BUDI95, RON95 subsidised at the price of RM1.99, lower still, and 300 litres at the subsidised rate to all— every Malaysian. Congratulations to the MADANI Government.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

However, I know that everything good still has room for improvement, and that is reported in the Auditor General's Report. And I would like to call on the government to pay attention to procurement, procurement, procurement, because all corruption, misappropriation and also leakages occur in the procurement part. Because from the Auditor General's Report, we see that in fact the sick projects, the delayed projects, are actually due to irregular procurement factors. And I am very disappointed that what happened, these sick projects, were in schools. Many schools are delayed, sick, suffering, our children who should be going to school in better conditions, but— and not only schools, also including the army, army families, construction of houses for army families, the Armed Forces (RKAT). Extension of time of more than 467 days, EOT four times. School construction, EOT 10 times, delayed 785 days. This is due to procurement. Not only that, we also see the management of government vehicles under the concession agreement. That is under SPANCO. All government vehicles, including the Tuan Yang di-Pertua's car, including the Prime Minister's car, Ministers and also government officers, even up to police vehicles.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

We see that in fact it is full of problems because this project is under direct negotiation with SPANCO. Earlier the government opened a tender, there were two companies listed, one was SPANCO, one was Naza Berjaya. Naza Berjaya offered a tender of RM3.9 billion, but after that the tender was closed, cancelled, and the government went into direct negotiation and awarded it to SPANCO at RM4.6 billion: RM670 million more expensive than the lowest price...

Tuan Sim Tze TzinPKR · PHBayan BaruEN

I agree with what the Honourable Member just shared a while ago. I recall that in 2019, indeed a tender was carried out and the tender was made openly. It is only understood that afterwards, the open tender was cancelled and direct negotiation was carried out. My question is, now the government under the leadership of the Honourable Tambun, but the decision where the open tender was cancelled and direct negotiation was continued, is still maintained. So, my question is, if you know there is a mistake and

Yang Berhormat.

Tuan Sim Tze TzinPKR · PHBayan Baru

Silakan.

offence, why does the government today not want to correct that mistake? Thank you.

error, why does the government today not want to correct that mistake? Thank you.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Okay, for the information of the House, we know that the agreement was not signed during the time of the Most Honourable Tambun. That was the previous government. And I feel sorry for the Prime Minister, because he has to bear the mistakes of the past. And I feel that it is necessary that I do not want to look for problems of the past, but let us look forward. What I want to propose to the government is to focus on the Procurement Division. The Procurement Division has been the root of all the problems that happened there. So, I want to propose to the government that it place MACC officers in the Procurement Division of every ministry, every department, and every government agency. Now, MACC officers are placed only in the ministry; they are not in the Procurement Division. And it is important that this be done in every Procurement Division, not one, not one MACC officer, not two, but several MACC officers at all levels of the Procurement Division. Because we know that contracts now, they are very clever. They can pau (rig) it from the bottom to the top. From the specifications. Even the specifications are written by other people. They are pau'd by contractor companies. So, it is necessary that MACC officers, whether officially or undercover, also place undercover MACC officers in the Procurement Division. Look closely at every process and make arrests, because we know that we can no longer allow the government to waste millions, billions of ringgit on government contracts, and in the end the sick, miserable projects are borne by our children in schools and also by the families of the armed forces. That is all, thank you, Mr Speaker.

Deputy Speaker (Dato’ Dr Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Bayan Baru. Next, I invite the Honourable Jerantut.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you, Mr Speaker. Firstly, thank you for giving Jerantut the opportunity to continue to take part in debating the Auditor General's Report No. 3/2025.

For everyone's information, this audit process or mechanism has five steps, which begin with audit planning, leading to its implementation, audit findings and assessment, preparation and review of the audit report, and finally presentation and follow-up action. And among the basic matters at the stage of presentation and follow-up action is that the Auditor General's Report is tabled or placed on the table of Members of Parliament so that Members of Parliament and also the public know about the level of governance of the government. So, this is a good action. However, there is one matter here that we need to elaborate on, namely that in discussing this National Audit Report, Mr Speaker, we often see the recurrence of the same problems. The issue of sick projects or the issue of integrity, the issue of poor governance is not a new issue, it is an old issue. Why does the repetitive problem occur, the recurring problem? That is why there is a need for the PAC, there is a need for a Special Committee established in Parliament to summon the ministries so that they can examine the recommendations proposed by the audit, whether they have been implemented by the Secretary-General (KSU) or the Audit Division at the ministry level or not? And this is important, and I also propose that not merely the Auditor General's Report be placed on the table, but I propose that the follow-up report on the actions implemented by the ministries also be placed on our table so that we can scrutinise it to ensure that the problems involved do not recur. That is the first, Mr Speaker. The second, regarding the issue of integrity and leakage in the people's subsidy and assistance programme. I would like to draw the attention of this House to one matter that is very close to the hearts of the people, namely the issue of integrity and leakage in the implementation of subsidy and people's assistance programmes stated by the Member of Parliament for Bayan Baru a while ago. According to this report, there are significant weaknesses in the management of targeted subsidies, particularly the packeted cooking oil subsidy and several other forms of social assistance under the Ministry of Domestic Trade and Cost of Living (KPDN) and the Ministry of Finance (MOF). The audit found that although the cooking oil subsidy is intended to help the B40 group, monitoring of manufacturers and distributors remains weak. Some manufacturers did not report the actual production of

subsidised cooking oil, while the system for tracking supply to the retail level did not function fully. As a result, significant leakage occurred, where subsidised cooking oil was diverted to the industrial sector or exported illegally. I support the recommendation of the Auditor General that the government, firstly, strengthen the targeting mechanism by integrating all recipient databases. I also support the implementation of annual audits of all subsidy schemes and social assistance, as well as the establishment of a special unit to detect, prevent and address the abuse of assistance so that this leakage can be detected as early as possible, and hopefully, when the recommendations of the Auditor General are implemented, the people who are supposed to receive this packeted cooking oil will receive it properly. Mr Speaker, regarding these sick projects, if we look at our experience under the Infrastructure Committee — the Special Select Committee on Infrastructure, Transport and Communications, we have met with KPKT. We asked why this problem occurred and what mechanism there is to ensure that these matters do not recur? Many answers were given by the ministry. Among them was the use of a traffic light system to ensure that all these actions can be implemented. But Mr Speaker, in such circumstances, these matters still recur. And it is not merely recurring at the procurement stage, as stated by Bayan Baru earlier. It also occurs at all stages: the project implementation process. Therefore, I propose to the government that the government must urgently draft a recovery plan for the RMK12 projects complete with a list of sick projects, timeframes for rectification, additional fund flows and consistent and rigorous monitoring. Secondly, we set a maximum time limit, or with permission, a cut-off time, for all projects that are still not completed after 2025 to be re-examined for eligibility and decided whether they should continue, be postponed or be cancelled. Thirdly, we need to increase interim audits or forensic audits on delayed projects so that all mismanagement, contractor delays or specification changes without justification can be detected early, and projects that are highly strategic and have high impact on the people must be given priority for speedy completion within a period of up to two years to come. And most importantly, punitive action must be taken against the contractors

involved so that they no longer receive contracts under the government, and if possible, our proposal is also that all these mega projects be awarded through GLCs. Rather than opening tenders directly to companies outside, so that an economic cycle occurs and the money returns to the people through the dividends given by the GLCs.

Last, Mr Speaker, the management of government vehicles under the MOF concession. Regarding the management of government vehicles under the concession operated by the Ministry of Finance. According to the report, a total of RM1.75 billion was paid to the concession company for the period 2021 to 2024. However, the audit findings show that there was an estimated penalty amounting to RM54.51 million that was not collected, as well as a loss of RM28.79 million because vehicles whose leases had ended were still being used by ministries or government agencies. What is even more shocking, Mr Speaker, is that a total of 6,028 vehicles were delivered late. Some were late by as many as 508 days, yet no notice of claim was issued to this concession company. This is what I call punitive action just now. The question, Mr Speaker, is whether this concession contract actually favours the company more than the government or the people? If not, why was no legal action or claim for compensation taken against the contractor who failed to meet the period and conditions of the agreement? I call on the Ministry of Finance to re-evaluate the entire structure of this government vehicle concession agreement. If necessary, table the re-evaluation report in Parliament, including action against any company that failed. Contracts like this must not be allowed to become a licence for profit without responsibility. The government must ensure that every contract signed favours public interests, not corporate interests. Mr Speaker, we may differ in party. We may also differ on many matters, but surely we must not differ on matters of trust and sincerity. This Auditor General's Report is an opportunity for us to improve, not for us to point fingers. If the MADANI Government has the courage to correct its mistakes, then we in the opposition, Perikatan Nasional, will support. But if the government chooses to turn a blind eye, then we will not remain silent. That is all, thank you, peace be upon you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Jerantut. Next, I invite the Honourable Seputeh.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Thank you, Deputy Chairman. Dato' Speaker. I would like to refer to the implementation of e-Selfaudit by the National Audit Department on 1,856 other bodies, including companies gazetted up to 6 February 2025, as stated in the Auditor-General's Report No. 3/2025 currently being debated. Will this e-Selfaudit also apply, or will it apply, to the Legal Profession Qualifying Board (LPQB)? The reason I ask this issue is because last year we were told in Parliament that no audit had been carried out on the LPQB for the past 17 years. Following that, the government took a proactive step to table amendments to the Legal Profession Act 1976 by inserting a new section 9A, which gives power to the Auditor General to audit the accounts of the LPQB every year. My questions are as follows. One, since this section 9A came into force, what steps have been taken by the National Audit Department to audit the LPQB? B, is the audit of the LPQB already under way, and also what have been the audit findings so far? Will the National Audit Department audit the LPQB's accounts which have not been audited for the past 17 years? If not, what is the mechanism for checking the LPQB's activities and finances? I think this is important because many people are indeed puzzled, that such an important agency as the LPQB has had its accounts unaudited for 17 years. Dato' Speaker, I would also like to mention and raise the issue regarding the report in this LKAN relating to the problem of dilapidated staff quarters and posts left unfilled for a long time at the Malaysian Representative Office in Wellington, New Zealand, and also similar issues occurring at Malaysian Embassy offices in other countries. Some Members of the PAC and I made an official visit to the Parliament of New Zealand a few months ago. We were also informed about the problem of old buildings and posts left unfilled by the Ministry of Foreign Affairs (KLN) because of financial problems. I also receive similar complaints whenever I make official visits to other countries and visit Malaysian Representative Offices in other countries.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

Here, I would like to call on the Ministry of Finance to provide sufficient allocation to upgrade or improve the old buildings at the Malaysian Embassy offices in many countries. As has been raised by several Honourable Members regarding this issue, sometimes they, our officers posted abroad, really find it very difficult to function because of insufficient funds given to them, and there are things they cannot do at all because, although they convey these problems to headquarters in Putrajaya, their complaints seem not to be addressed with sufficient attention and sufficient funds. I hope that in the coming budget, more funds will be given to them. Dato' Speaker, I would also like to mention the implementation of government projects, where in this list as of 31 December 2024, the Ministry of Education Malaysia (KPM) is facing sick projects, incomplete projects, delayed projects and even abandoned projects. It is the ministry facing this problem most seriously. Here I want to mention my experience as a Member of Parliament, where I usually try to help upgrade the schools in my area with funds provided by the government through the Implementation Coordination Unit (ICU). We often face problems involving structures. For example, I once wanted to help a Tamil primary school to alter or enlarge its canteen roof, which has a very simple structure. I actually received assistance from a developer company to help the school. This was free, but I had to wait three or four months because the Public Works Department (JKR) once sent an officer to check and give a report, only then could this private party do this for the school free of charge. Likewise recently, when I tried to use the money, the funds for my Parliamentary constituency, to help the school. The same problem. They had to wait for engineers from JKR to verify, and the officers of the Education Department of the Federal Territory of Kuala Lumpur said they could not do this. This is an SOP and so on, and they must use contractors under JKR or the Ministry of Works (KKR). So, if we look, compared to the quotation I received from the private party. The quotation under the Ministry of Works contractor is two or three times more expensive than the contractor I have, who is qualified, who is available, who has received a licence recognised by the ministry. Now there is

Puan Teresa Kok Suh SimDAP · PHSeputehEN

a problem: if we want to use the funds given to our constituency effectively, we face difficulties. We must use contractors under the Ministry of Works. They are always slow, always late, and they give quotations that are far higher because this is the condition imposed by the government.

Puan Teresa Kok Suh SimDAP · PHSeputehEN

I want to ask the government, the ICU or the Ministry of Education and also the Ministry of Works. Can you sit together to facilitate all these processes, because what we want is to help schools, and now we see strong winds and heavy rain happening often. Many schools have old buildings. In fact, we can see roofs leaking or blown off by strong winds. If we have to wait for contractors, and wait for engineers to verify, upgrades always take a long time, so the school, the children, have to use the canteen, use the hall and study there. I propose that the Ministry of Education and the Ministry of Works must sit together. Give leeway, give the schools, the PIBG, freedom to improve their buildings, and with the delayed projects as reported in Auditor-General's Report 3/2025, I hope changes will happen in terms of improving, upgrading and also building new buildings for schools. That is all, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Seputeh. I invite the Honourable Mas Gading.

Tuan Mordi anak BimolDAP · PHMas GadingEN

Thank you, Dato' Speaker, for giving Mas Gading the opportunity to take part in the debate on the Auditor-General's Report Series 3/2025 on the Federal Government Financial Statements for the Year 2024 and the activities of federal ministries, departments and companies. Mas Gading would first like to record appreciation to the Auditor General and the entire team of the National Audit Department for this comprehensive and responsible report. This report is not merely a financial document, but a reflection of the level of accountability and responsibility of administration in managing the people's money. Dato' Speaker, the first matter that Mas Gading would like to touch on here is the management of Federal debt and hidden liabilities. Mas Gading

Tuan Mordi anak BimolDAP · PHMas GadingEN

taking note that the total liabilities of the Federal Government rose to RM1.578 trillion in 2024, compared with RM1.492 trillion in 2023. Meanwhile, federal debt rose to RM1.248 trillion, although the deficit ratio fell to 4.1 per cent of KDNK, compared with five per cent the previous year, the fact is that debt levels remain at a high level. So, Mas Gading also sees a significant pattern of supplementary expenditure, namely RM8.4 billion in 2021, RM60.1 billion in 2022, RM23.4 billion in 2023 and RM20.1 billion in 2024. This raises the question of the extent to which this supplementary expenditure is integrated in the annual audit report. Mas Gading would like to ask, does the Auditor General's Report also take into account a comparison between the estimated supplementary expenditure approved at mid-year and the actual expenditure as recorded in the audit report? Is there a detailed explanation of the impact on the national debt ceiling if large supplementary expenditure occurs every year? Mas Gading proposes that the Auditor General's Report in the future include a comparative analysis between the original and supplementary Supply Bills so that this House can more clearly assess the level of fiscal effectiveness and the capacity to manage the long-term deficit. Mr Speaker, the second matter that Mas Gading wishes to raise here concerns the arrears and write-offs of various Accounts Receivable (ABT) of revenue, yes. Mas Gading takes seriously the finding that the total of various revenue ABT rose to RM51.664 billion, with the Inland Revenue Board of Malaysia (LHDNM) recording the highest amount, namely RM40.389 billion or 92.9 per cent of the various revenue ABT of the Ministry of Finance and 78.2 per cent of the total ABT recorded. What is more worrying is that revenue exceeding a period of six years amounts to RM20.672 billion, a high sum that is at risk of being written off. So, Mas Gading would like to ask, what are the actual factors that caused these arrears to persist for more than six years without resolution? Is it legal constraints, or weaknesses in the collection monitoring system, or the absence of coordination between the collecting agencies and the National Audit Department? So, Mas Gading proposes that the Ministry of Finance and LHDNM introduce an integrated digital revenue recovery mechanism that can

Tuan Mordi anak BimolDAP · PHMas GadingEN

track and detect all ABT in real time, including reviewing the write-off process so that it does not become an easy path for failure in revenue collection. The third matter to be raised here is the implementation performance of development projects under the Twelfth Malaysia Plan in Sarawak. Mr Speaker, the audit report also emphasises the need for immediate resolution of delayed projects or sick projects under RMK12 so that all planned projects can be completed by 2025. Mas Gading wishes to stress that the delay of development projects is not merely a statistic. In Sarawak, for example, important projects such as the Selampit Bridge and the Kendai Road in Mas Gading's constituency, which were approved since RMK11, have only begun to show progress under RMK12 and now face the risk of further time loss if they are not completed before RMK13 begins. Mas Gading would like to ask, what is the actual cause of the delay in implementing these projects? Is it due to site approval and land acquisition processes that take too long, or because of bureaucratic red tape between implementing agencies at the state and Federal government levels? Mas Gading also does not rule out the possibility that other factors, such as weak communication between implementing agencies and main contractors, as well as issues relating to advance payments and expenditure claims throughout project implementation, also contribute to these delays. At the same time, Mas Gading hopes that no political element influences the smooth running of Federal Government projects in Sarawak, particularly in areas represented by Members of Parliament from the opposition. If such a tendency exists, it not only undermines the image of the administration, but also betrays the interests of the people who are waiting for the benefits of these projects. So, Mas Gading proposes that a transparent monitoring system based on real time, namely a real time open monitoring dashboard, be established for every Federal project in Sarawak and Sabah, which can be accessed by constituency Members of Parliament, implementing departments and the general public. This not only increases transparency at every stage of project implementation, but also enables issues of delay, cost variation and contractor performance to be monitored and rectified immediately.

Tuan Mordi anak BimolDAP · PHMas GadingEN

Mr Speaker, this Auditor General's Report is not merely a report of figures or statistics, but reflects the extent to which the government fulfils the people's trust in managing public money with integrity and responsibility. With the implementation of the Audit (Amendment) Act 2024, which gives the Auditor General more power to conduct follow-up audits on findings and recommendations, Mas Gading hopes that the ministries involved will take all these findings seriously and promptly rectify the weaknesses identified. Fiscal accountability, transparency in revenue management and efficiency in project implementation are no longer options, but obligations that must be carried out to restore public confidence in the integrity of government administration. Therefore, Mas Gading respectfully requests support. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Mas Gading. Next, I invite the Honourable Member for Padang Serai.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, thank you, Mr Speaker. Having examined the Auditor General's Report, there are several matters that I feel should be brought forward and explained by the government. This report is not merely figures and statistics, but a real picture of how weak the management of national finances is under the current government administration. First, the national debt is soaring. Mr Speaker, Federal debt has reached RM1.248 trillion, an increase of RM75.105 billion, equivalent to 6.4 per cent, in just one year. Every Malaysian now bears a debt burden of almost RM40,000. What is more worrying, the ratio of debt to KDNK remains at 64.6 per cent, almost touching the 65 per cent ceiling permitted. Of this amount, RM490.023 billion, or 39.3 per cent, will mature within one to five years, meaning the government has to take new loans to pay old debts. Expenditure to pay debt is not only— debt alone has already consumed RM50.481 billion, an increase of RM4.150 billion, nine per cent compared with 2023.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

This is enough to build 100 new hospitals or to finance a food assistance programme for five years. What is shocking, Mr Speaker, is that the composition of debt shows Malaysian Government securities of RM633 billion, government investment issuances of RM570.8 billion and foreign loans of RM27.976 billion. My question to the Ministry of Finance is, why is the government's debt management strategy clearly failing, with the annual debt growth rate still high at 6.4 per cent? How does the government plan to pay RM490.023 billion of debt that will mature within the next five years? Why has the shift to long-term instruments failed to reduce the burden of expenditure due to national debt? Second, the failure to collect national revenue. Mr Speaker, what is more shameful is the government's failure to collect national revenue. Various Accounts Receivable of Revenue have reached RM44.554 billion, an increase of RM5.039 billion, 12.8 per cent, in one year. Even more shameful, RM20.672 billion, or 46.4 per cent of it, has already exceeded six years and is at risk of being written off. In 2024 alone, RM337.14 million was written off. The people's money has simply disappeared. Analysis finds that the Inland Revenue Board of Malaysia failed to collect RM40.389 billion in tax revenue. The Ministry of Health has ABT of RM358.89 million for patients' medical bills. The Prime Minister's Department failed to collect RM463.21 million. Most distressing, Mr Speaker, of the RM40.389 billion ABT of LHDNM, RM26.2539 billion or 65 per cent is corporate income tax, a large amount. RM11.381 billion, or 28.2 per cent, is individual income tax, and RM18.727 billion has exceeded six years. Why is LHDNM's collection mechanism so weak that it allows tax arrears to reach RM40.389 billion? What action has been taken against officers who failed to collect money owed to the government as provided under section 18 of the Financial Procedure Act 1957, and why did the government allow the write-off of RM337.14 million in 2024 when this money could have been used to finance programmes for the people? Third, development projects that fail to be completed. The Auditor General's Report reveals that there are 157 development projects categorised as sick. An official admission of the government's failure to carry out its basic responsibility to the people. Let us discuss the facts. The first, the neglected Army Housing Project. The RKAT Kukusan project,

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

Tawau, with a value of RM100 million, has been delayed by 418 days with two EoT approvals. What is more shameful, work at the site has completely stopped and the contractor has failed to carry out its obligations. Only on 23 May 2025, nearly three years late, was the placement notice finally issued. The RKAT Labuan project worth RM63.25 million has been delayed by 467 days with four EoT approvals. The reasons given include incompetent workers, weather problems and logistical issues. What is distressing is that this project now has to be carried over to RMK13, meaning our soldiers have to wait even longer. The second, the neglect of education for children in the interior. The construction project for Sekolah Kebangsaan Metalun in Belaga, Sarawak, worth RM34.56 million, has received 10 EoT approvals over 785 days. Imagine failing to comply with the schedule 10 times, being allowed to extend the time 10 times, and disappointing 170 pupils and eight teachers who have to study and teach in uncomfortable conditions. Third, the widespread waste of the people's money. The project to upgrade Galeria Perdana, Langkawi, worth RM20.4 million, requires an additional cost of RM40.20 million, an increase of 197 per cent over the original cost. This is unacceptable waste. Shocking statistics. Of 8,755 projects under RP4 RMKe-12, 3,829 projects or 43.7 per cent are in implementation, 157 projects; 4.1 per cent are categorised as sick, 242 projects; 6.3 per cent show no progress at all. Actual expenditure from 2021 to 2024 was RM315.932 billion compared with an allocation of RM307.908 billion. Mr Speaker, this is not merely numbers, this is lives, this is the future, this is the hope of the people that has been betrayed. Soldiers who sacrificed for the nation's security have to wait for the homes that were promised. Children in the interior of Sarawak have to study in conditions that are unsafe and uncomfortable. The people's money is being wasted recklessly. The government has a responsibility to give an immediate explanation and take immediate remedial action. The people have waited far too long and suffered too much because of weaknesses in project management. Fourth, the widespread waste and leakage. Mr Speaker, the Road Transport Department failed to collect RM115.96 million from vehicle registration number revenue. The Malaysian Maritime Enforcement Agency (APMM) spent RM521 million on ship maintenance, yet there were payments for equipment that was never supplied. Most offensive of all, the government failed to impose

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

a penalty of RM54.51 million on concession companies that were late in supplying vehicles to the government. My final question to the government, why was no action taken against concession companies that were late in supplying vehicles, causing losses of RM54.51 million to the people? What is the government's assurance that leakage in the maintenance of APMM's ship and boat assets will not recur? Mr Speaker, this audit report proves three things. First, widespread leakage. Second, weak management. And third, a lack of integrity. I demand: (i) that the Public Accounts Committee investigate all these issues; (ii) that the relevant minister provide a detailed explanation; (iii) that disciplinary action be taken against the parties who were negligent; and (iv) that immediate remedial action be carried out. Mr Speaker, the people are tired of the many sweet promises. The people want action, the people want transparency, and the people have the right to know why their money is being spent in such an irresponsible manner. Thank you, Mr Speaker.

[Dewan tepuk]

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Padang Serai. I now invite the Honourable Member for Besut to speak. As the Honourable Member for Besut is not in the House, I will proceed to the Honourable Member for Bukit Bendera.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

Thank you, Mr Speaker, and thank you for giving Bukit Bendera the space and also the opportunity to take part in the debate on the Auditor General's Report. So, every year the Auditor General's Report becomes a mirror of how we manage the people's trust. The year 2025 shows great progress in the nation's fiscal management, but also reminds us that economic success without integrity and good governance is only half the struggle. So, the Auditor General's Report for the Federal Government of Malaysia depicts a mixed picture between fiscal performance that is improving and governance challenges that still persist. The Auditor General has issued an unqualified certificate on the Federal Government's Financial Statements for the year ended 31 December 2024, which

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

confirms that the accounts give a true and fair view and are also well maintained. What is encouraging is that the federal fiscal deficit has decreased significantly, reduced by RM12.22 billion, bringing the deficit-to-KDNK ratio to only 4.1 per cent compared with five per cent in the previous year. So, government revenue rose to RM324.62 billion and this shows an improvement in national fiscal management, providing more room for development expenditure and also reducing dependence on debt. Mr Speaker, this is a sign of progress and also shows that the nation's fiscal discipline is being restored, that the government is able to spend more wisely, borrow more prudently and also move towards more sustainable development. However, I emphasise the word however. Behind these fine figures, this Audit Report also reminds us of the danger of leakage and weak governance that still haunts our system.

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

Debt now reaches RM1.248 trillion, equivalent to 81.7 per cent. But what is more frightening is that RM490 billion of this debt will mature within five years. So, imagine the burden awaiting future generations if we cannot act more firmly. Mr Speaker, these figures are not my only concern. There is something far more serious, namely that the waste involves not only money but also the nation's security. This report also reveals weaknesses in the Malaysian Maritime Enforcement Agency (APMM). Payments of RM32.5 million were made for boat equipment that was not supplied or did not meet specifications. Late-delivery penalties were not collected. Technical tests that should have ensured the assets function were not carried out. So, as a result, a patrol boat could not operate at all. Mr Speaker, this is not merely a failure of administration in financial matters, but a failure to defend the nation's sovereignty. So, imagine at a time when our waters are exposed to threats of smuggling, intrusion and illegal activities, the agency that should be the sea defence bulwark fails to function because of waste like this. So, my question is, who approved this payment? And why has no disciplinary action been taken against those who failed to carry out this responsibility?

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

Mr Speaker, when we speak about Malaysia on the international stage, we are not only speaking about diplomacy or foreign policy. We are speaking about the nation's dignity. Every embassy and every high commission is the face of Malaysia in the eyes of the world. So, the places where the Jalur Gemilang is raised with great pride are also the places where the integrity of our administration is tested, assessed and closely watched. Yet the Auditor General's Report (LKAN) reveals facts that are very worrying. So, several overseas missions, including those in Canberra, Wellington, Singapore and Hanoi, failed to comply with the basic certification requirements for government asset management. Furniture, computers and office equipment all belong to the people, but they were not recorded in the official government registers, thereby breaching the General Treasury Circular. In Wellington, two monitors and eight meeting chairs were not listed. In Canberra, a cabinet and a bookshelf went missing from the records. So, Mr Speaker, this is not a matter of a lost table or chair. This is a matter of trust and responsibility. So, an asset that is not recorded is an asset that can disappear without a trace, and when that happens, it is tarnished. It is not only the records that suffer, but also Malaysia's good name. So, here I call on the government to expedite the implementation of an integrated digital asset database system for all 108 overseas missions. Every asset must be recorded, tracked and audited in real time. But I understand that managing international operations is not easy. However, financial discipline cannot be abandoned on the grounds of difficulty. Therefore, I also wish to propose a plan to strengthen financial governance overseas. Malaysia must be known not only for its diplomatic voice but also for transparent, clean and integrity-based governance. Mr Speaker, this Auditor General's Report must not merely be tabled to be read and then forgotten. It must become the basis for comprehensive reform in procurement systems, financial management and the accountability of civil servants. Fiscal discipline is not merely a matter of numbers in financial reports. It is a reflection of honesty, responsibility and integrity towards the people of Malaysia. For, Mr Speaker, every sen spent must carry meaning, every policy must add value and every decision must reflect the trust the people have placed in us. As the government, we have a responsibility to ensure that every weakness is corrected, every leakage is more tightly controlled and every

Puan Syerleena binti Abdul RashidDAP · PHBukit BenderaEN

reform is implemented with determination and transparency. So, this is our commitment. Not only to manage the nation well, but also to restore the people's confidence that this government serves with integrity and honesty. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member.

Mr Speaker. Mr Speaker, I am already here. I thought my turn had not yet come. So, I request to be called after this.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Please proceed, Honourable Besut.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)

Silakan.

Can I go now? Okay. Thank you. How very kind of you, Mr Speaker. Assalamualaikum warahmatullahi taala wabarakatuh and salam sejahtera. Thank you, Mr Speaker, for giving me the opportunity to debate the Auditor General's Report 3/2025. First, I would like to touch on the expenditure on the obsolete assets of the APMM. Dato' Speaker, according to the LKAN, the Malaysian Maritime Enforcement Agency (APMM) was found to have spent approximately RM229.93 million on vessels over 30 years old and RM78 million on boats aged between 11 and 20 years. So, this large expenditure shows an excessive dependence on old assets that carry risks in terms of their function and also their cost. So, these assets continue to be maintained at rising costs without technical justification. Yet they still failed to improve the level of operational capability. Has the management of the APMM been influenced by what is called the sunk-cost fallacy, with permission? That is, continuing an effort simply because a lot of money has already been spent before, even though it no longer makes sense to continue. So, we have already seen the error of the sunk-cost fallacy in the history of defence assets. Previously, there was the Nuri helicopter, where we kept repairing and repairing. Broken, repair. Broken, repair. So, it was about five decades old, yet its maintenance costs were higher than buying a new helicopter, until

eventually several accidents occurred that claimed the lives of our security personnel. I hope the Nuri syndrome just mentioned will not be allowed to recur at sea. Therefore, the time has come for us to move away from symptomatic maintenance, called― broken, repair, badly broken, still repair― towards a strategic replacement plan to ensure that the enforcement agency can operate more fully. Second is the irregularity in the management of the APMM's own assets. Apart from the issue of maintaining obsolete assets, there were several irregularities in the procurement of the APMM's own assets. Among those wasting the nation's money was payment of nearly RM60,000 for equipment that was not supplied, and about RM140,000 spent on equipment that did not follow the specifications. So, irregularities also occurred when crucial tests to ensure seaworthiness, with permission, Mr Speaker, of the vessels were not carried out before the assets were accepted. This is feared to potentially endanger the lives of APMM personnel themselves if they are allowed to use assets whose quality and operational capability at sea are not guaranteed. The third potential is potential revenue not collected. Dato' Speaker, there have been several times the potential― this potential is quite difficult, is it right or not? So, unrealised revenue potential or fines not collected was raised in this report. For example, the estimated additional revenue of at least RM115 million could be collected if the registration numbers of vehicles that were blocked and inactive numbers were offered to the public at a minimum price.

So, this figure represents a loss of about seven per cent of the actual amount collected between 2022 and 2024, which is RM1.648 billion. So, the loss from this potential revenue shows the weaknesses of the mySIKAP system and also of the SOPs in the JPJ, which the government should give attention to in order to improve their effectiveness. The LKAN also details losses from fines and rentals not collected as follows. The APMM reportedly had RM2.27 million in late fines not collected. The MOF, RM54.51 million in late-delivery penalties for concession vehicles not collected, and the LLM and also the JKPTG, RM96,000 in lease rentals not collected. So, overall, the report shows that Accounts Receivable rose to RM44.55 billion in 2024 compared with RM39.52 billion in 2023, an increase of 12.8 per cent. So, RM20.6 billion of this

has been outstanding for more than six years and is at risk of being written off. So, these figures may seem small when viewed separately. However, taken as a whole, they reflect a basic pattern of weakness in the government's financial governance. Every unrealised revenue potential, every fine not collected and every rental not collected is also simply lost, meaning a loss of resources for the people, whether in the form of public facilities, education or security. Therefore, the government should give priority to strengthening revenue monitoring systems and also the enforcement of penalties so that the people's money does not continue to be lost. Not because of theft, but because of administrative negligence. Dato' Speaker, in the end this Auditor General's Report proves that although the slogan 'MADANI Bekerja' is proudly proclaimed, the reality is that the government's financial management is still riddled with problems in asset handling, weak enforcement of contracts and failure to realise the government's revenue potential. This is not a political matter, but a matter of critical fiscal accountability on the part of the government that must be addressed. No, what I mean is that we are debating here, it does not mean we are blaming the government. So, when this LKAN is tabled, our purpose is to debate and to rebuke what is wrong, but there are sycophants in this House who accuse us of all sorts of things. [Applause] We debate, and if they want to flatter, then flatter, but do not go so far as to accuse people of all sorts of things, okay. So, there is still much more. So, these things that happened may be related to governance. Improper governance, which the PM has often mentioned, governance, governance, where is the governance? This is what I want to state, that, finally, I thank the Speaker once again for allowing me to debate. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Besut. Next, I invite the Honourable Tanjong Karang.

Assalamualaikum warahmatullahi taala wabarakatuh. Thank you, Mr Speaker, for giving me the space to also debate the LKAN 2025.

Mr Speaker, Tanjong Karang wishes to record its appreciation to the Accountant General's Department of Malaysia for tabling the Accountant General's Report Series 3/2025. This report is very significant because it serves as a key instrument in ensuring that the management of the nation's finances is carried out in a transparent, efficient and accountable manner. Tanjong Karang also views that this report shows two important things. First, our audit and accounting system still functions well. Second, this report courageously reveals weaknesses in financial administration that need to be corrected immediately. However, what I always emphasise is that a report is only meaningful if it is followed by action. Our primary responsibility is no longer the findings, but the follow-up action and the implementation of corrections. Overall, the financial performance of the Federal Government in 2024 improved with a reduction in the deficit and the deficit-to-GDP ratio compared with 2023. In 2024, the deficit decreased by RM12.224 billion to RM79.166 billion compared with RM91.390 billion in the previous year. The deficit-to-GDP ratio also declined to 4.1 per cent compared with 5.0 per cent in 2023, and was better than the target of 4.3 per cent set in Budget 2024. This achievement lays a solid foundation for achieving the medium-term deficit target of below 3 per cent. Next, Tanjong Karang will turn to the issue of the supply of concession vehicles. This is the main finding, namely that delays in the supply of government vehicles by concession companies involved 6,028 units delayed between 1 and 508 days. As a result, the government incurred additional costs of nearly RM28.79 million because it had to keep vehicles whose leases had expired. What is more worrying, there is no record showing that penalties were imposed on the companies involved, even though the value of the breaches or losses is estimated to reach around RM54.1 million. This usually indicates weaknesses in the enforcement system, governance or financial accountability. Where, even though misconduct or negligence occurred, no action was taken against the parties responsible. Mr Speaker, in a modern economy, delays and additional costs like these are not merely technical matters. They are a sign that the mechanism

for monitoring contracts still operates manually and reactively. Here I propose three concrete improvement measures. First, interim reporting to Parliament: a report on the status of audit actions should be tabled every quarter, not just once a year. Second, an integrated digital monitoring system, establishing a Contract Performance Tracker platform under the Accountant General to track the performance of government contracts in real time, real-time monitoring, with permission. Third, automatic penalty clauses: every delay should trigger an automatic penalty through the system without depending on manual decisions by officers. Next, fourth, this measure does not require additional bureaucracy; rather, it reduces the risk of leakage and streamlines the control process. We need to view this audit report not merely as a reprimand but as an institutional learning tool. Disciplinary or corrective action should not be purely punitive. Instead, it should become a mechanism for continuous improvement, continuous improvement, with permission, in the public service. I am confident that if every ministry establishes an active internal audit monitoring unit, many weaknesses can be resolved before they become national issues. Mr Speaker, the financial integrity of the nation is the foundation of the people's trust in the government. Weaknesses in contract implementation must be corrected through a disciplined, data-based system. This Accountant General's Report is not merely a post-mortem document but an opportunity for us together to strengthen a culture of professional, transparent and responsible financial management. Accordingly, I call on all the reprimands in this report to be translated into measurable actions and reported back to Parliament regularly. Thank you, Tanjong Karang seeks to support. Wabillahi taufiq wal hidayah. Assalamualaikum warahmatullahi wabarakatuh.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Waalaikumussalam. Next, I invite the Honourable Maran.

Bismillahirrahmanirrahim, Assalamualaikum warahmatullahi wabarakatuh. Greetings

of wellbeing. Thank you, Honourable Dato' Speaker, for allowing me to debate the Auditor General's Report 3/2025. Dato' Speaker, this Auditor General's Report proves that we have robust systems and procedures. Audits are carried out every year, complete with reprimands and recommendations for improvement. However, the major question remains the same: why do governance problems keep recurring? The answer is not because our system is weak, but because the implementation of action is still not firm and not comprehensive. Many reprimands remain only on paper, without the seriousness to improve, to correct the same weaknesses from year to year. Dato' Speaker, I am not pointing fingers at anyone, but the reality is clear. Many sharks escape, while small fish are continually chewed up without mercy and have their dignity destroyed. Lower-level officers are reprimanded, but decisions at the higher level are rarely questioned. If we want to restore the people's trust in the government's integrity, the courage to enforce accountability must start from the top. Audits are not an annual ritual. They should be a mirror of political courage to correct the system, not merely patching the same crack every year. Do not waste the hard work and sacrifices of government officers, especially of the National Audit Department. Dato' Speaker, I would like to touch on several matters in debating this Audit Report. A strategic issue concerns the state of Pahang, Dato' Speaker. Expenditure deficit, budgeting and high dependence on non-recurring revenue. In 2024, Pahang recorded a shortfall of RM128.17 million compared with a surplus of RM7.16 million in 2023. State revenue fell by 6.6 per cent, mainly non-tax revenue, which was lower by RM113.19 million, covering land premiums, forest royalties and fines. This question arises because Pahang recorded a deficit of RM128.17 million and state revenue fell by 6.6 per cent. What steps will the Federal Government take to re-evaluate the federal revenue distribution formula to the states, particularly for resource-producing states such as Pahang that depend on land premiums and forest produce? What is the Federal Government's long-term plan to strengthen fiscal governance between the states and the Centre? For example, through the sharing of audit findings data or technical training to strengthen states' financial capacity. States lose fiscal flexibility and find it difficult to finance social projects and infrastructure without loans. It worsens the fiscal image in the eyes of investors and

the Federal Government. There is a risk of a deficit recurring every two to three years if the revenue structure is not renewed. Weak governance of development projects causes the implementation of projects to be very unimpressive. 49 per cent of the development projects of the Twelfth Malaysia Plan (RMK12) have been completed, but Dato' Speaker, more than 50 per cent of projects are still delayed and have not been implemented. The question is, of the total RMK12 projects, only 49 per cent have been completed, while more than 50 per cent are still delayed. What are the causes of this delay? Is it due to weak planning, problems with allocation, contractor capacity, or delays in technical approval? Or is it deliberately sabotaged because of party politics? If so, this is a betrayal of the department to the people. The implementation of the Maran Hospital, for example, is a very relevant case today. It was cancelled twice because of changes of government due to political structures. Delays in implementing projects can undermine the quality of public services, roads, water and infrastructure. They undermine the comfort of people's lives, as well as other social problems. Dato' Speaker, I would also like to ask, how many projects or government assets have been built but not properly managed afterwards? I would like to ask about government quarters, for example. There are government quarters that are abandoned and not managed in some places. How many government quarters are abandoned across the country? What is the government's plan to address this issue, and what is the government's plan for developing the land on which the government quarters are located?

Dato’ Rosol bin WahidBERSATU · PNHulu Terengganu

Maran.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Regarding these government quarters, I think this matter has been raised many times before, Mr Speaker. Government quarters, for example, such as teachers' quarters that have been left abandoned. An audit was carried out, but until now there is still no action or anything. [Unclear] taken to fill that vacancy. What is Maran's view? Thank you.

Thank you. Include it in my speech...

Dato’ Rosol bin WahidBERSATU · PNHulu Terengganu

Hulu Terengganu.

Oh, Hulu Terengganu, sorry. And I ask the government to take action in line with my expectations. Weak asset management and accountability of the agency. Procurement of collection artefacts worth RM0.5 million was made without the approval of the board of directors, and not — preventive maintenance for assets worth RM11.6 million. Some agencies do not set approval value limits, and even advance payments to suppliers exceed the permitted rate. What will happen if the Procurement Bill (Rang Undang-undang Perolehan) recently passed gives the Minister of Finance full power to make any decision on national finances? Mr Speaker, there are several issues I want to raise regarding the Ministry of Housing and Local Government (KPKT). Contract enforcement and blacklisting. Termination of blacklisting of KPKT contractors. How many contractors under KPKT have been, will be, or have been blacklisted throughout the RMK12? In accordance with Treasury Circular PK4.5, Procedure for the Management of Sick Projects. State by year, state and category of offence. What are the latest Audit recommendations that KPKT has implemented for abandoned and sick development projects, and has the report been published for public review, the date of publication, the link and so on? Buyer protection and financing support. Loan restructuring and a one-stop centre. What are the statistics on applications for bank loan rescheduling facilitated by KPKT, specifically for buyers of sick projects? State the number of cases, loan value, approval rate and processing time. Is the one-stop centre functioning effectively so far? Mr Speaker, what are the new eligibility requirements and due diligence that have been tightened following the experience of stalled sick projects? For example, minimum working capital ratio, track record of CCC delivery and also performance bonds. Build and sell policy, pilot study. To what extent has a feasibility study of this build and sell model been carried out on a large scale for public housing, given that the rate of sick projects remains worrying? If so, state the scope, pilot locations, timeline and success metrics. What are the plans to strengthen the Housing Development Act (Akta Pemajuan Perumahan) and buyer protection regulations, reasonable shortening or lengthening of the defect

liability and what are the penalty actions for delay, stricter enforcement of quality assurance on projects?

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Maran, once again. Maran, can I?

That's it already.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Still have a long time?

A little more. Based on…

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Can? Can't?

A little bit. Oh, go ahead. Hulu Terengganu. Just a little.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Okay, Mr Speaker. Just a little. Earlier Maran said at the beginning of the speech, saying the big sharks escaped, the small ones were chewed up. Can Maran give an example of that? Thank you very much.

Many Mr Speaker. There is Mr Speaker. [Laughter] I will discuss with Hulu Terengganu later. Dato’ Mr Speaker, the status of sick projects behind schedule, causes of delay, specific actions. Based on findings up to 31 December 2024, there are 11 KPKT projects with status behind schedule and sick. I ask the Minister to explain in detail what specific communication strategy has been implemented by KPKT to ensure buyers always receive the latest information on project status, their rights and resolution steps?

[Dato’ Indera Mohd Shahar bin Abdullah (Paya Besar) chaired the Sitting] The last one, how much feedback has been given? What percentage of buyers state that the resolution mechanism by KPKT is adequate and fair to them? What is the status of the recovery of these projects by the end of RMK12? New timeline, cash flow plan, recovery financing sources. And is there regular progress auditing with KPIs and public publication? Yes... [Laughter] Dato’ Mr Speaker, sorry, a little time. Thank you very much. Wassalamualaikum warahmatullahi wabarakatuh.

Thank you, Honourable Maran. Next, Honourable Rasah, eight minutes.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you Mr Speaker for the opportunity given to me to take part in debating the Auditor General's Report 3/2025 which audited several agencies last year. This is yet another proof of institutional reform. Not merely a slogan, but implemented, practised transparently and continuously in our Parliament when the Auditor General's Report is not merely tabled and— tabled and laid down only, but all Honourable Members from both sides are allowed to debate together and give any views, and subsequently, are answered by each ministry involved. For me, this kind of practice is very important. It does not only signify the government keeping its promise to reform existing institutions to add teeth, to give more power to the National Audit Department through the amendment of the Audit Act Bill last year, but more importantly is to correct all weaknesses in the existing government governance procedures so that all government funds are always used and channelled in the right way for the benefit and interest of the people of Malaysia. And more importantly, after the Auditor General's Report, after it is debated and answered tomorrow by the ministries involved, I hope that all proposals, yes, recommendations from the Auditor General's Report can be implemented after this, so that any weaknesses and loopholes that occurred before are not continued. That is what is important about having an Auditor General's Report. I extend congratulations and kudos to the government because the financial performance of the Federal Government in 2024 improved. This is a sentence in the audit report itself which says that the reduction of the deficit by RM12.24 billion, something very good if we look at the ratio. The ratio of deficit to GDP (KDNK) last year, 2024, was 4.1 per cent compared with 2023; 5 per cent, in 2022; 5.5 per cent and the year before, 2021; 6.4 per cent. This means our deficit-to-GDP ratio is decreasing, the better our economy. Of course, because the MADANI Economic Framework implemented by the government has succeeded in controlling inflation. Our currency is in a state that

Tuan Cha Kee ChinDAP · PHRasahEN

is strong compared with world foreign currencies, along with foreign investment continuing to increase and also the KLCI index continues to be stable at a convincing level. Such a situation will certainly enable the Malaysian economy to always be in a condition that convinces foreign investors to make Malaysia an attractive investment destination for them. Although there is much praise or many good things in this audit report, there are some reprimands that need attention. I want to pick just two here. The first, involving the Ministry of Foreign Affairs, namely the audit carried out physical audits at the Malaysian High Commission offices in Canberra, Australia, Singapore, Wellington, NZ and also the Malaysian Embassy in Hanoi, Vietnam. Yes, we see there are some matters stated. But my first question is the operating allocation for all four of our foreign representative offices involved, in Hanoi, in Singapore, in Canberra, in Wellington, the amount is 23.58 million, but only 13.89 million was used, which is only 58.59 per cent. Why is that? Is it because of circumstances that were unforeseen or because of staffing? Because I see in the audit report it says there is a staffing problem. That means there is something we need to improve. Because if it involves staffing, I hope it can be filled because embassy offices or High Comm offices abroad represent the sovereignty of our official representatives in foreign countries. So, I hope this matter can be given important attention, focused attention, serious attention from the Ministry of Foreign Affairs. And I want to mention several reprimands regarding these High Comm and Embassy offices, which are actually many matters that in my view need to be improved and should not have happened. They did not record assets correctly or failed to record them. And also there is one, I will give one example, I mention this specifically. The Malaysian Representative Office in Canberra, for four landscaping maintenance works at Rumah Malaysia and the Chancellery totalling RM27,000. Actually, in Australia, if it's 27,000 for us, perhaps only about 10,000 in their money. The work was done, it's not that work wasn't done. The work was done, only there were no details of work and total working hours. So, such matters I feel that if we have enough staff, positions all filled, we can overcome problems like this. So, this matter has indeed been done because by coincidence the JKPK visit to Australia once visited our High Comm in Canberra in June last.

Tuan Cha Kee ChinDAP · PHRasahEN

And I also want to take this opportunity to thank and congratulate the government, especially the Ministry of Foreign Affairs, which has given specific allocation to our embassy in Brussels, Belgium which is now starting to do— repair, renovation. Recently I had the chance to meet our Ambassador in Belgium and he greatly appreciates this matter. Only I want to ask, what about other embassies? Because these embassies are important, they represent our country. They show that our country is serious and becomes a leader on the world stage. And the second matter I want to comment on a little is regarding the performance of implementation of RMK12 development projects. In Rolling Plan 4 (RP4) for 2024, a total of 8,755 projects involving all ministries. Some are many, some are fewer. Of course the Ministry of Education Malaysia (KPM) has more than 2,000 projects, the most. I want to focus on projects behind schedule or, simply put, sick projects, there are a total of 157. If we look at the number or percentage, it is only about two per cent of the total 8,755. But for me, we should not take lightly this small two per cent percentage. It is the responsibility of us, all relevant ministry agencies, to ensure these sick projects do not happen in the future. I want to say this, I want to say it specifically, Dato’ Mr Speaker. I ask for a little extra time. KPM has 46 projects, KKDW 34, PETRA has 12, the Ministry of Health Malaysia (KKM) has eight. KPM, I believe the 46 projects involve construction, whether construction of new schools in new development areas or new buildings for existing schools. This is important, this should not have happened. So, there must be monitoring, there must be firm action. If the mistake is by the contractor, proper steps must be taken, firm action must be taken so that the project can be completed and other contractors do not follow suit. If other contractors will be afraid if we are firm, whether the one monitoring is perhaps not KPM, perhaps the Ministry of Works (KKR). It must be ensured because this is an issue of our children's education. Secondly, I see PETRA has 12 projects. I believe these are flood mitigation projects. Please, let us not only be vocal about it in flood season, saying this is not there, that is not there. But on ordinary days, not in monsoon season. However, we must ensure these projects are completed before the monsoon season.

Tuan Cha Kee ChinDAP · PHRasahEN

It is the same situation with KKM, eight projects. Whether involving hospitals or clinics, they must be completed on schedule so that this matter can be avoided. I humbly suggest that with the amendment to the Legal Profession Act 1976 last year, I humbly ask the National Audit Department to audit the Malaysian Legal Profession Qualifying Board because this board manages the Certificate in Legal Practice (CLP) examination (Sijil Amalan Guaman (CLP)). I asked a question last year in this honourable House which was answered by the Prime Minister's Department that for 17 years it has never been audited. I know this CLP examination. I once took this CLP examination. Every year this LPQB collects millions in examination fees. Where does the money go? It is mandatory, it is appropriate to audit so we know where. They use it properly, we do not accuse them, but it must be told. The last matter, Mr Speaker, is regarding the MARRIS allocation. We know it is a grant from the Federal Government to all states based on the total length of roads in each state, whose main officer is the state financial officer. I understand that last year alone RM5.4 billion was for all states and for the state, it is channelled to the relevant agencies. It is very important. Only I hope there is one audit at the Federal level. How is its distribution, so we can monitor it. This amount is very large, RM5.4 billion. A very large sum. Often we hear roads here are damaged there and cause danger to our people, our road users. So, to avoid this problem, we must be firm. Ensure the funds are used optimally for the safety and welfare of our people. Thank you to Mr Speaker for the extra time and I hope all reprimands from the Auditor General's Report can be taken as constructive criticism by all relevant agencies and ministries for the common good. That is all, thank you.

Thank you, Honourable Rasah. Next, Honourable Pengkalan Chepa, eight minutes.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and God's mercy and blessings. Thank you to Dato’ Indera Mr Speaker for giving me the opportunity

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

to stand up and touch on a very big issue relating to the trust of the ummah. I will not say much, just one point I want to mention about what is stated in the Auditor General's Report, which is related to Urusharta Jamaah Sdn. Bhd. or in short UJSB. This company was established at the end of 2018 in the era of the PH1.0 Government, supposedly to rescue Tabung Haji. However, until today in 2025, its eventual direction is still unclear and full of question marks. Honourable Dato’ Speaker is also aware of this matter. We must speak honestly. Mr Speaker, UJSB was established under the Pakatan Harapan Government with the aim of restoring the financial position of Tabung Haji. At that time, many assets worth RM9.7 billion including holdings in 106 listed companies, 29 properties, several hotels that were formerly Hotel Tabung Haji and now have changed to Hotel Raia, if I'm not mistaken, and plantation assets that were transferred to (UJSB) Urusharta Jamaah Sdn. Bhd. In return, UJSB issued two sukuk totalling RM19.6 billion with two maturity periods. One, seven years and one 10 years, and paid cash of RM300 million, making the total RM19.9 billion. The purpose was to plug the gap between Tabung Haji's assets and liabilities so that its financial statements would again record a surplus of assets. However, the reality is that this RM19.9 billion is not profit. It is a debt that must be redeemed by UJSB to Tabung Haji. More worrying, these sukuk are non-coupon, zero coupon sukuk, yet have a maturity return value that causes the government's liability to increase from year to year. Based on the Auditor General's Report series 3/2025 on page 57, the Federal Government's guarantee commitment to UJSB increased to RM23.815 billion for 2024. An increase of nearly RM0.70 billion compared with the previous year. This proves that the fiscal burden is not getting lighter but increasing. After six years have passed, Mr Speaker, six years have passed already. The total redemption of UJSB sukuk is only RM400 million. What was said to be RM19.9 billion earlier, only RM400 million has been redeemed. Roughly two per cent of the total. This means the remaining RM19.2 billion has not yet been redeemed. At the same time, the current value of UJSB's assets is only around RM9.7 billion, so there is a gap of nearly RM9.5 billion between the sukuk and the asset value held by UJSB. The question is, with a gap this large, how will UJSB

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

menebus sukuk menjelang matangnya sukuk pada tahun 2026, satu. Dan satu lagi sukuk pada tahun 2029, iaitu tujuh tahun dan juga 10 tahun. Mr Speaker, izinkan saya jelaskan kronologi penting supaya Dewan ini faham konteks sebenar, kerana kadangkala bila bercakap tentang isu Tabung Haji UJSB ini, pihak kerajaan sendiri pun sentiasa memberikan jawapan bertulis. Tidak mahu berjawab secara lisan kerana mungkin lebih selesa begitu untuk tidak ada argument yang panjang. Kronologinya pada Disember 2018, UJSB ditubuhkan oleh Kerajaan PH sebagai Syarikat Tujuan Khas (SPV) untuk memulihkan Tabung Haji. Mei 2019, UJSB menerbitkan dua sukuk bernilai RM19.6 bilion membayar RM300 juta tunai kepada Tabung Haji sebagai balasan pembinaan aset RM9.7 bilion. 2020 hingga 2022, Tabung Haji kembali stabil dengan hibah purata 3.10 diisytiharkan selama empat tahun berturut-turut. Namun, kestabilan itu diperoleh kerana liabiliti dipindahkan kepada UJSB, bukan hasil pulangan sebenar aset. 29 September 2023, Perdana Menteri (PMX), Tambun mengumumkan hasrat kerajaan untuk memulangkan semula aset-aset Tabung Haji yang dipegang oleh UJSB. Beliau menyatakan keyakinan terhadap tahap tadbir urus baharu Tabung Haji yang ada sekarang ini. 18 Februari 2025, Menteri di Jabatan Perdana Menteri Hal Ehwal Agama telah memaklumkan di Dewan Rakyat ini bahawa rundingan pemulangan aset akan dimuktamadkan pada suku pertama tahun 2025 serta memberikan jaminan bahawa proses tersebut tidak akan menjejaskan kedudukan kewangan Tabung Haji mahupun kepentingan deposit. Sekarang ini dah bulan 10. Suku pertama 2025 sudah pun lama berlalu. Soalnya sehingga hari ini, pelan tindakan masih tidak kelihatan. Bagaimana pemulangan itu akan dilaksanakan? Bila ia akan berlaku dan dengan sumber dana apa jika jurang hampir RM9.5 bilion masih lagi wujud? Siapakah yang akan menanggungnya, UJSB kah atau Tabung Haji kah atau pembayar cukai kah, kita sebagai rakyat ataupun kerajaan yang akan membayar kah? Mr Speaker, janji untuk memulangkan aset tanpa pelan penebusan yang jelas hanyalah retorik politik. Kita tidak boleh terus menipu diri dengan angka cantik di atas kertas, sedangkan beban sebenar disembunyikan di bawah karpet. Rakyat dan pendeposit berhak tahu di mana pelan penebusan? Apa strategi pelaksanaan dan bila aset ini akan dikembalikan kepada tangan Tabung Haji? Saya dalam persidangan lepas pun telah bangkitkan, sampai sekarang saya tidak menerima jawapan daripada kerajaan tentang perkara ini. Bilakah? Kerana suku

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

pertama 2025, sebagaimana dijanjikan oleh Menteri Agama dalam Dewan ini, tidak ada nampak bayang-bayangnya. Mr Speaker, kita juga mesti menilai semula falsafah pengurusan aset Tabung Haji. Pada zaman PH, muncul cadangan pelupusan besar-besaran ladang Tabung Haji iaitu di bawah kelolaan Tabung Haji Plantations daripada 100 ribu hektar ladang hendak dikecilkan sekitar 24 ribu hektar sahaja, iaitu pengurangan hampir 75 peratus pegangan ladang Tabung Haji. Ini ibarat menjual angsa yang bertelur emas. Antara ladang terlibat ialah Bumi Suria Ventures dan Maju Warisan di Sarawak yang dicadangkan kepada— dijual kepada Tamaco Plantation di bawah harga pasaran dengan nilai RM170 juta. Lebih rendah daripada harga sebenar di pasaran.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Apabila Perikatan Nasional mengambil alih kerajaan di bawah kepimpinan Pagoh pada waktu itu, kita telah membatalkan penjualan ladang itu. Dan kita telah memulihkan ladang itu: sehingga sekarang, saya tak tahulah apa status ladang itu? Adakah masih berada di Tabung Haji Plantation ataupun senyap-senyap sudah pun beralih kepada tangan yang lain. Inilah falsafah dua pentadbiran. Kerajaan PH melihat aset strategik sebagai liabiliti dan mudah memilih jalan pintas untuk jual, jual, jual aset ini. Kerajaan PN melihat aset ini sebagai potensi jangka panjang yang boleh dipulihkan dan menjana hasil untuk generasi akan datang. Tabung Haji bukan milik kerajaan, Mr Speaker, ia milik umat Islam. Hasil jerih payah rakyat kecil yang menabung satu demi satu, seringgit demi seringgit, menguruskannya bukan hanya soal angka atau laporan kewangan, tetapi soal amanah, tanggungjawab di sisi Allah SWT. Maka UJSB bukan sekadar isu teknikal, ia adalah ujian kejujuran dalam menguruskan harta umat. Justeru saya mendesak kerajaan agar mengambil langkah-langkah berikut. Kita pembangkang yang konstruktif, bukan kita nak balun, kemudian kita nak lihat kemusnahan. Kita mencadangkan cadangan yang konstruktif iaitu: pertama, tubuhkan Jawatankuasa Khas Parlimen, bipartisan bagi menilai semula struktur prestasi UJSB termasuk strategi pelaburan, penilaian aset, risiko fiskal kepada kerajaan. Bentangkan pelan penebusan sukuk berfasa lengkap dengan angka dan jadual tahunan yang jelas bagi menunjukkan komitmen sebenar kerajaan dalam menebus baki RM19.2 bilion. Ini duit pendeposit-pendeposit Tabung Haji. Wajibkan penerbitan laporan tahunan UJSB kepada umum dengan penilaian bebas

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

(independent valuation) dan kemas kini penebusan sebenar supaya rakyat tahu kedudukan sebenar aset umat Islam ini. Hentikan retorik pemulangan aset selagi tiada pelan tindakan yang konkrit dan dijamin tidak membebankan TH ataupun pendeposit. Pertimbangkan penstrukturan semula sukuk sama ada dengan melanjutkan tempoh matang, menukar sebahagian daripada pegangan ekuiti kerajaan ataupun melaksanakan haircut terhad, asalkan tidak menjejaskan kepentingan para pendeposit. Akhirnya Mr Speaker, Laporan Ketua Audit Negara telah menzahirkan realiti sebenar, komitmen jaminan kerajaan – jaminan UJSB kini RM23.815 bilion, penebusan hanya RM400 juta dan jurang RM9.5 bilion masih tidak terjawab. Ini bukan masa untuk slogan dan pengumuman manis, tetapi masa untuk pelan konkrit dan tindakan berani. Jika kerajaan benar serius mahu mengembalikan maruah Tabung Haji, maka bentangkan pelan penebusan, laksanakan tindakan nyata dan kembalikan keyakinan para pendeposit dan umat Islam dalam negara kita. Sekian, terima kasih Mr Speaker. [Tepuk]

Terima kasih, Honourable Pengkalan Chepa. Berikutnya Honourable Arau, lapan minit.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, rakyat Malaysia, orang muda. Ketua Pemuda ada, Pengerusi PN ada. Speaker Paya Besar, terima kasih. Yang pertama sekali, mengulangi ucapan saya. Saya ingat sudah banyak kali saya ulang, tetapi jawapannya juga berulang tapi tindakan di lapangan kurang. Saya sering kali disebut kenapa tiap-tiap kali ucapan sebut fasal Beting Patinggi Ali? Saya dah cerita, saya jumpa Premier of Sarawak baru-baru ini, dia maklum dan beberapa tindakan yang wajar telah diambil dan pelbagai pihak telah dimaklum tentang kepentingan Beting Patinggi Ali. Kalau sudah habis rizab kita di mana-mana, Beting Patinggi Ali menunggu di tempat yang terbaik, tapi Beting Patinggi Ali, sekarang ini ada kapal asing di sana. Kapal China Coast Guard berada di sana sejak 2013 sampai sekarang dan kapal-kapal kita pun berkawal bersama navy ada satu, Malaysian Maritime Enforcement Agency (APMM) ada satu. Ini Mr Speaker, ini berdasarkan masa pengalaman jadi menteri dulu. Saya tak pasti sekarang berapa, tapi saya mendapat maklumat sebab mana orang nak cerita dekat kami.

Akta Rahsia Rasmi, pegawai kerajaan tak nak bercakap dengan kami jadi saya tak tahu, saya masih dalam bertanya. Berapa kapal yang berumur 30 tahun ke atas? Ini ialah garis ukur yang dipakai di negara-negara maju, termasuk Jepun iaitu 30 tahun ke atas tak dipakai lagi, tapi 30 tahun ke atas kita baru nak pakai. Contohnya, dua buah biji kapal yang dihadiahkan oleh Kerajaan Jepun kepada kita berumur 29 tahun masa itu. Sekarang dah mungkin dekat 40 tahun sebab saya pun tak jadi menteri dah dekat 10 tahun, jadi dekat 40 tahun. Jadi kapal itu masih diguna dan dia merupakan kapal terbesar APMM. Jadi soalan saya, berapa kapal yang berumur 30 tahun ke atas? Siapa nak jawab sat gi saya tak tau, saya— Kemudian berapa kapal yang berumur 30 tahun ke bawah? Sebab ini ialah termasuk dalam laporan audit, ya. Jadi soalan saya sekarang ni, berapa kapal yang diletakkan untuk berkawal di Beting Patinggi Ali? Kapal China Coast Guard kalau kita lihat daripada atas helikopter, dia duduk tak bergerak apa. Tinggi mana ombak pun dia berada di situ, Laut China Selatan, 80 batu nautika daripada Bintulu. Bintulu pun sekarang makin popular ya. Okey, 80 batu nautika. Jadi kapalnya begitu saja nampak. Kapal navy kita nampak begitu, walaupun kapalnya separuh daripada kapal China Coast Guard, tetapi bila tengok dua biji kapal APMM, nampak dia bergerak mengikut ombak. Jadi ternampak ada goyangan kapal itu menunjukkan bahawa ini ialah kapal kecil ataupun bot yang besar. Jadi kita minta supaya kerajaan memerhatikan serta-merta dan jangan tunggu kapal tersebut berumur 30 tahun baru nak ganti. Sekarang ni kerajaan kena usahakan supaya kapal-kapal diganti serta-merta. Ini bukan untuk APMM termasuk navy. Saya tak payah sebut sebab navy ni mungkin penting nak bincang dari keselamatan. Tak elok dibincang secara terbuka tapi APMM, penguatkuasaan ni kena bincang, sebab kalau Honourable Member ada pernah membuat perjalanan waktu malam, daripada Kuching ke Kuala Lumpur, atau Kuala Lumpur ke Kuching, ataupun ke Kota Kinabalu, Honourable Member akan nampak lampu-lampu hijau, color hijau, di Laut China Selatan. Itu ialah di kawasan Malaysia. Bot ini bukan bot Malaysia, ini bot negara asing terutamanya daripada Vietnam. Kalau kita nampak, kalau kita boleh bilang saja, sudah pasti hampir ratus bot color hijau, tapi APMM yang berkawal, yang mampu untuk nak tangkap mungkin empat atau lima biji sahaja. Jadi, kita cadangkan supaya penggantian segera. Jangan jawab ‘akan’ lagi, tak payah jawab pun tak apalah sebab kalau jawab ‘akan’, tak ada akan punya, buat serta merta.

Mr Speaker sebagai Pengerusi Backbencher yang hebat dan dahsyat, tolong tegur sebab Honourable Member duduk tempat itu boleh tegur, dok kat bawah orang takkan dengar dah. Boleh tegur supaya menteri bagi jawapan yang tegas bahawa kapal-kapal akan diganti. Dia kata macam mana nak ganti, kena panggil tender. Procurement Bill baru-baru ini baru diluluskan. Kuasa Menteri Kewangan yang tidak terbatas terutamanya dari segi keselamatan, boleh membuat penggantian serta-merta, sebab kalau tunggu 30 tahun baru nak oder, lagi tahun depan lima biji kapal, bererti lima biji akan mengambil masa dua tahun, tiga tahun. Jadi sampai waktu mungkin berlaku peperangan dan sebagainya, takkan kita nak beritahu dekat musuh, boleh tak tunggu sekejap, kapal saya belum siap. Jadi ini adalah satu benda yang melucukan, tapi ini kebenaran, realiti rakyat Malaysia. Kadang-kadang bila saya cakap, kata seronok saya cakap. Tak! Ini fakta! Fakta bahawa kapal penguatkuasa tak cukup. Yang ada, ini laporan audit ya, kapal lama yang ada. Wahai rakyat Malaysia, 61 peratus daripada perbelanjaan, RM229.93 juta dibelanjakan untuk kapal yang berusia 30 tahun. Bererti kapal 30 tahun ni kalau kita boleh order kapal, mungkin tiga biji kapal, tapi digunakan untuk maintenance. Tambahan RM78 juta untuk bot berusia 11 sehingga 20 tahun. Walaupun bot itu bot baharu, muda, tetapi dengan lautan ini dia terpaksa – kita kena buat maintenance dari masa ke semasa. Ini menunjukkan bahawa APMM masih bergantung kepada aset lama yang mana berisiko tinggi dari segi fungsi dan keselamatan juga kos penyelenggaraan. Jadi persoalannya, apakah kerajaan bercadang untuk menggantikan aset usang ini serta merta dibandingkan terus menyusu kos refit yang semakin membebankan. Bagaimanakah kerajaan nak selesai kes Beting Patinggi Ali?

Beting Patinggi Ali bukan tuntutan bertindih. Ada bekas Perdana Menteri dulu menyebut ini bekas — ini adalah tuntutan bertindih. Mana boleh bertindih kawasan Malaysia. Kawasan Malaysia kalau orang masuk, menceroboh. Kalau bertindih di atas gigi sempadan, dia panggil menceroboh. Gigi sempadan kita adalah 200 batu nautika. Ini dia masuk ke 80 batu nautika. 4,000 batu daripada Hainan, negeri yang terdekat dengan Malaysia. Jadi, bagaimana kita kata ini tuntutan bertindih? Ini pencerobohan. Dia mesti dikeluarkan serta-merta dan usaha diplomatik dibuat menyuruh mereka keluar daripada 2013. Dia hanya keluar sekali selama sebulan iaitu bila Perdana Menteri

mereka melawat Malaysia, dia keluar sebulan, tetapi datang balik. Jadi, kena pastikan Wisma Putra, Ministry of Defence, kerajaan demi berganti kerajaan, tetapi masalah ini terus mengganggu kita. Saya dah berhenti jadi Menteri pun, sampai sekarang ini terpaksa menyebut. Saya rasa belum habis dilaksanakan tiba-tiba kerajaan ditukar. Kalau tidak, wallahualam ya. Kemudian, perancangan refit. Penyenggaraan yang agak lemah. Saya tanya, siapa bertanggungjawab? Menteri kena ambil tanggungjawab tentang perkara ini. Kita juga — audit juga mendedahkan bahawa terdapat RM2.27 juta masih belum dikutip daripada kontraktor yang gagal siapkan kerja mengikut jadual. Jadi, saya minta supaya kontraktor tersebut kita tak lindungi, kita kena buat tuntutan dan juga terdapat kelemahan kawalan pembayaran. Terdapat tuntutan RM32.34 juta tanpa invois, bayaran dibuat tanpa dokumen yang sah, RM59,800 dibayar untuk peralatan tidak dibekalkan, RM144,536 dibayar untuk peralatan tidak mengikut spesifikasi. Ini adalah satu bentuk kebocoran jelas malah seakan lesen mencuri di bawah sistem kontrak kerajaan. Maka, saya mencadangkan supaya sekali lagi kapal diganti. Kemudian, refit mestilah buat secara menyeluruh dengan garis masa dan kos terkawal. Kutip segera duit penalti RM2.27 juta daripada kontraktor yang culas. Audit forensik terhadap bayaran tanpa invois dan peralatan tidak dibekalkan. Saya tak mahu, ini kawan-kawan saya cadang suruh blacklist. Saya ini, blacklist ni apakah — apa makna blacklist? Kadang-kadang kerajaan kena bagi tafsiran apa makna blacklist. Kalau blacklist kita nak hukum dia suruh dia terjun telaga, tak apa. Kalau sekiranya dalam Malaysia ni apa makna blacklist? Apa makna buang — anak-anak yang nakal buang sekolah, apa makna? Saya tak faham. Kalau dia buang sekolah, you campak dia dalam masyarakat atau menambah beban kepada sekolah yang dipindahkan. Ini mungkin juga blacklist. Dia nak jadi apa? Dia mungkin jadi bankrap ataupun sebagainya. Blacklist ni bagi tafsiran yang betul. Sekarang ini kalau kita bagi blacklist kepada Menteri yang terlibat dengan pelbagai kesalahan, apa nak kata? Kita tak buat apa pun, kita kata bagi amaran yang keras. Akhir sekali Speaker, dah masuk lapan minit. Seminit ya, fasal Pulau Mabul sebab Honourable Member pun nak dengar. Pulau Mabul ini, kontraktor telah gagal tetapi pelantikannya tak dibuat sampai sekarang. Jadi, kita menunggu. Ini keselamatan rakyat Malaysia. Ini soal keselamatan, tak boleh tunggu. Kontraktor ini gagal, dia kena lantik serta-merta. Jangan buat perangai. Ada satu kes kepada sebuah sekolah sukan, kontrak itu gagal. Maka, konsultan telah mencadangkan kontraktor yang

sama dipilih pula. Gagal lagi, tiga kali gagal. Sekarang masuk gagal yang keempat sehingga saya pernah dengan kawan-kawan mencadangkan supaya bagi kami tolong buat, kami perhabis, siapkan walaupun rugi. Kementerian tak percaya sebab dia percaya melantik kontraktor yang gagal demi gagal. Jadi, kes Pulau Mabul, saya minta supaya dilantik serta-merta kontraktor. Kontraktor ramailah. Macam kalau baling dengan batu jumpa seoranglah. Boleh, ramai. Boleh gunakan Procurement Bill yang telah kita luluskan untuk membolehkan. Soal keselamatan ini tidak boleh ditolak ansur. Terima kasih Speaker. Walaupun nampak gelisah, jangan gelisah. Saya tahu bila saya nak berhenti. Jangan suruh saya berhenti, tak manis sebab saya dah lama di sini. Terima kasih banyak-banyak untuk semua rakyat Malaysia. Terima kasih. Tap, tap skrin guys. Assalamualaikum warahmatullah.

Terima kasih Honourable Arau. Saya persilakan pembahas yang terakhir, Honourable Kota Melaka.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Deputy Speaker, for giving me the opportunity to debate the audit report. Deputy Speaker, I do agree with what Arau said before I began my speech, namely that we need to buy new ships to replace the old ones. The only question is, why, when he was in government, did he not buy new ships? Now that he is in opposition, he wants to fight for it, to proclaim it, to buy new ships. Before that, I also want to ask that, since this Audit Report is an important document, I propose that the report be supplied in physical form to every Member of Parliament. We know that we are now going paperless, where many documents are no longer printed for Members of Parliament, but I feel this report is important. If possible, I ask that at the very least the report for the Federal Government be supplied to every Member of Parliament. Deputy Speaker, I see here through this audit report that we can say that this MADANI Government has the courage to accept criticism. This is because the 2024 Audit Report reflects the performance of this MADANI Government, and it has the courage to table it in this Parliament to be debated, to accept criticism or suggestions. Congratulations. This is a reform in that this audit report is the sixth time we have debated it in this Parliament. Congratulations to the government.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

We can see that the performance of this Federal Government in this audit report has improved. Among them, we see that the deficit has decreased by RM12.24 billion. If we look at 2023, the deficit was RM91 billion, but it was reduced to only RM79 billion in 2024. Meanwhile, the ratio of deficit to GDP also saw a decline from five per cent in 2023 to 4.1 per cent in 2024. This is a good development, where our target is ultimately to achieve a ratio of three per cent. With the performance we have, we believe it can achieve that three per cent. The same goes for borrowings. Borrowings have also decreased by RM39 billion, which is a reduction of 16.3 per cent. If we look, in 2023 our borrowings were RM241 billion and they were reduced to RM202 billion in 2024. Congratulations to the MADANI Government. This shows the government's intention to manage finances prudently, with accountability. So, I have three matters that I want to raise based on the report this time. The first is related to the auditing of other bodies, including companies, through the e-SelfAudit system for 2025. This too is an improvement, a reform that has been achieved by this MADANI Government under the leadership of the Honourable Tambun. Why do I say so? Because we have this new chapter. This is the seventh section, which is a new section arising from the amendments to the audit law that were passed in the Dewan Rakyat last July. As a result of these amendments, among other things, the powers of the Auditor General have been expanded to audit other bodies, including companies that receive financial guarantees from the Federal Government or the state governments. This audit is not only limited to the holding company, but also to subsidiary companies under the holding company concerned. This is a reform because we often see that many irregularities occur through companies that are set up and receive allocations or funds from the government. So, this is a good thing. We can see the results of these amendments. In the past, in 2023 and 2022, only 925 companies were gazetted and could be audited, but through the amendment to this Act, today 1,856 bodies have been audited, which is an increase of more than 100 per cent. So, with these amendments, the National Audit can go and audit, and surely we can reduce leakages.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

And at the Federal Government level, 850 companies have been audited. And out of those 850 companies, Deputy Speaker, yes, we see that 641 companies have submitted feedback, whereas 34 companies failed to submit feedback and 174 companies are in winding up or dissolved status or are no longer related to the government. So, these figures show that the audit amendment is good, to the extent that we can know which companies set up by this government are dormant, and which have gone into winding up, where no action was taken previously. So, with this audit, we can take follow-up actions to ensure that only good companies are retained, and companies that do not show good performance, we close down. So, we see through this improvement and this reform that among the companies at the Federal Government level that have been issued the certificates and views of the Auditor General is Petronas Nasional Berhad, PETRONAS ― Petroliam Nasional Berhad (PETRONAS). Previously, we often could not audit PETRONAS's accounts, but through that amendment, today we can see PETRONAS's accounts, Petronas Carigali Sendirian Berhad and so on. So, this is a reform that can strengthen the culture of integrity and also governance in the public sector. The next chapter I want to raise is related to the audit of the Road Transport Department (JPJ), Ministry of Transport Malaysia. Based on the results of their audit, they state that collections for 2022 to 2024 amounted to RM1.648 billion from the sale of vehicle registration numbers. However, there were some shortcomings, and because of those shortcomings, the government may receive around RM115 million less in income. So, in this chapter, what I see ― I believe through the response from JPJ, from the ministry, they will improve and this problem can be overcome, but what I want to raise here is that we must also look at the initiatives carried out by the Ministry of Transport, where they have launched a special registration number sales programme or special number tender. Through the sale of special numbers, they generate revenue income and from that income, they have carried out many welfare programmes for the public.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Among them, from the proceeds of the sale of these special registration numbers, JPJ or the Ministry of Transport has provided free driving licence assistance for category B2 to the B40 group. They have also given free safety helmets. This programme also benefits those in the B40 group. Next, they also run a subsidised airfare assistance programme between Peninsular Malaysia, Sabah and Sarawak for students and during festive seasons. That is why we can see that every time the festive season arrives, AirAsia or other airlines are able to offer cheap tickets, as a result of the government providing subsidies from the proceeds of the sale of these registration numbers. So, these are all good examples that we should support. Apart from that, Deputy Speaker, I refer to the next topic, which is related to the management of government vehicles under concession agreements. I also heard earlier that opposition Members of Parliament criticised this matter. But I want to emphasise to Parliament that this concession was signed in 2022, January, namely on 31 January 2022. At that time, over there, Perikatan Nasional was the government. It was they who went and signed such a concession. PAS was part of the government at that time. So, we see that because of that weakness ― it should have been through an open tender but they did direct negotiation. So, I want to make a proposal to the government, to the Ministry of Finance, that we review it. If there is room, we should cancel this concession agreement and hold an open tender and give it to the company that rightfully qualifies. Next... [Interjected] Yes, do you agree? Because at that time it was Pagoh, right. At that time, Pagoh, yes. Next, I want to mention, finally, what's it called, related to this audit report, it also states that as of 31 July this year, 321 or 5.7 per cent of 5,667 issues are still under action, which involve audit reports from 2016 to 2025 Series 2. So, I hope that strict action must be taken on the 321 cases that remain in arrears, which are still outstanding. So, finally, we see that the government today has improved its financial management performance, it has become better, and we believe that in future it will become even better, because we see that the Government Procurement Act and also the Integrity Institutions Act have been passed, where it will emphasise the principles of accountability and responsibility. So, that is important to ensure good finances, because we see that the debt we have to repay is very high, and this audit report also states that the maturity period of Federal debt from one year to five years amounts to RM490 billion. A big figure. Surely the Ministry of Finance faces a challenge in obtaining sufficient resources. So, we need to support the government in its efforts to ensure transparency and prevent leakages. That is all from me. Thank you.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Honourable Kota Melaka, as the last debater. Honourable Members, the debate on the Motion on the Auditor General's Report No. 3/2025 has concluded today. A total of 23 Honourable Members took part. Tomorrow, Wednesday, 8 October 2025, the Honourable Minister or the Honourable Deputy Minister of the relevant ministries will respond to the issues raised by Honourable Members. Honourable Members, today's sitting of the House is adjourned until 10 a.m. on Wednesday, 8 October 2025. Thank you, Honourable Member.

[The House adjourned at 4.48 p.m.]

[The House was adjourned at 4.48 pm]

Special ChamberSpecial Chamber

[Puan Hajah Rodziah binti Ismail (Ampang) presiding over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Involvement of Kalabakan in One District One Industry (SDSI) Programme and Social EnterprisesSpecial Chamber

Bismillahirrahmanirrahim. Madam Speaker, with reference to the matter above, I wish to move a motion on the issue of government governance under Standing Order 17. This motion is addressed to the Honourable Minister of Entrepreneur and Cooperatives Development to seek an explanation regarding Kalabakan's participation in the One District One Industry Programme, or SDSI, and social enterprises.

Kalabakan has tremendous economic potential. Its strategic location near an industrial zone and a port enables it to emerge as an integrated economic development hub. However, the reality is that Kalabakan still faces various challenges in developing local enterprises, particularly in the agriculture sector, small businesses, micro enterprises and social enterprises. This calls for serious attention so that the existing potential can be fully harnessed.

In this context, the One District One Industry Programme implemented by the Ministry of Entrepreneur and Cooperatives Development is an important mechanism that can strengthen the capacity and capability of local entrepreneurs. This programme not only focuses on the development of selected industries, but also places strong emphasis on the active involvement of the community in the economic ecosystem, with the aim of improving the living standards and income of the local population.

In addition, the social enterprise initiative driven by KUSKOP also opens up space for Kalabakan residents to establish entities based on sustainable social missions. Social enterprises play a role not only in generating profit, but also in addressing poverty, providing employment opportunities to youth and women, and preserving environmental sustainability.

Nevertheless, the implementation of this programme requires more thorough coordination between the government, the private sector and the local community. At the same time, support in the form of skills training, technical guidance, access to financing and consistent monitoring of programme effectiveness must be implemented so that the results can be felt by the people.

Accordingly, I wish to raise several questions, namely firstly, to what extent has Kalabakan truly been involved in SDSI 2.0?

Secondly, what are the ministry's criteria for identifying suitable and potential industries in this district, whether value-added agriculture, non-timber forest products, livestock, trade or eco-tourism?

Thirdly, what are the long-term strategic measures to ensure that Kalabakan's participation is not merely symbolic, but truly makes this district a model of rural economic development based on social enterprises and sustainable industries?

Therefore, I believe that only with a comprehensive and integrated approach can Kalabakan significantly contribute to the economic development of the state of Sabah and the country as a whole.

That is all, thank you.

I invite the Honourable Minister to reply. Please proceed.

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

Thank you, Speaker. Thank you to the Honourable Member for Kalabakan for his concern regarding Kalabakan, the area he represents.

For the information of the Honourable Member, the Ministry of Entrepreneur and Cooperatives Development (KUSKOP), through its agency, the National Entrepreneurship Institute (INSKEN), has implemented the One District One Industry Programme (SDSI), which is an economic development initiative that highlights the uniqueness of local products based on the district identity resulting from the efforts of the local community. In this regard, KUSKOP has prepared a framework for the development of SDSI products together with the state government. This is to empower entrepreneurs through a comprehensive approach, starting from the selection of potential industries, capacity development, right through to branding, packaging, certification and marketing.

Through implementation under the Twelfth Malaysia Plan, a total of 22 ISDSI products have been successfully registered and developed, including several that have obtained halal certification. The majority of entrepreneurs have also recorded sales increases of more than 20 per cent after joining this programme. For the implementation of SDSI in Sabah, a total of eight SDSI products have been identified, namely the ginger industry in Tambunan, the gong industry in Matunggong, the swiftlet nest industry in Pitas, the young coconut oil industry in Kudat, the liking fish industry in Kota Belud, the taro rice industry in Kota Belud, the anchovy industry in Tawau and the coffee industry in Ranau.

In this regard, only the swiftlet nest, liking fish and Ranau coffee industries meet the criteria for industry development under the

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

SDSI, namely involving the local community, unique products and providing employment opportunities to local residents. So far, the Honourable Member –– for the information of the Honourable Member, there is not yet any industry or product developed under the SDSI programme in the Kalabakan area.

However, based on the initial study by this ministry, KUSKOP, together with the Sabah State Government, through the Sabah Industrial Development and Research Department (DIDR), there are several industries with potential to be developed in the Kalabakan area, particularly the local craft and food industries that have added value and their own appeal.

Datuk Ewon BenedickUPKO · PHMinister of Entrepreneur Development and Cooperatives · PenampangEN

The Honourable Member may put forward proposals if there are unique industries that meet these criteria; the Honourable Member may submit them to me or to the ministry, and we will plan their development together with the Sabah State Government. For further coordination, KUSKOP is ready to work with DIDR Sabah in detailing the products with potential in the Kalabakan area to be developed under the SDSI Programme.

This includes compliance with the SDSI Programme criteria, namely that the product must be unique, using local raw materials, implemented by the local community and providing employment opportunities to local residents. These are based on four product clusters, namely the food and beverage cluster, the health products and services cluster, the village homestay cluster and the craft cluster.

In the context of long-term implementation in the Kalabakan area, under the functional scope of my ministry, KUSKOP is of the view that the SDSI implementation agenda focusing on unique products based on local resources can attract more visitors and generate new income.

In addition, the approach through the Social Enterprise Model, including the development of cooperatives based on community tourism, can be considered in the Kalabakan area in collaboration with Sabah State Government agencies to ensure that rural development can be carried out comprehensively.

For the information of the Honourable Member, the number of social enterprises across the country at present is 491 enterprises that have been given social enterprise endorsement. Of that number, 75 come from Sabah.

Of that number, in turn, 21 are social enterprise cooperatives in Sabah alone.

And here in Kalabakan, for the information of the Honourable Member, there is one cooperative that has been given SE endorsement, namely the Kalabakan Sustainable Oil Palm Planters Cooperative. Meanwhile, in its neighbouring town of Tawau, we have the Nasib Kita Tawau Berhad Cooperative, which has also been granted social enterprise endorsement.

Under the Thirteenth Malaysia Plan, the development of social enterprises and inclusive businesses is a major focus of KUSKOP, and I welcome any proposals from the Honourable Member regarding potential products or those we develop under SDSI. Or cooperative enterprises that we can give social enterprise endorsement, so that government programmes through KUSKOP and its agencies can be delivered to Kalabakan. Thank you.

I invite the Honourable Member for Kalabakan to ask his question.

Thank you for the comprehensive reply from the Minister. My supplementary question is, how does the ministry plan to institutionalise the Social Enterprise Model in Kalabakan so that it does not remain a temporary project or CSR, but becomes a permanent component of district development policy.

This includes through the establishment of a Social Impact Investment Framework, the recognition of the status of local social enterprises and integration with cooperatives and regional development agencies to ensure that economic benefits flow back to grassroots communities in a sustainable manner. Thank you.

I invite the Honourable Minister to reply.

Datuk Ewon BenedickUPKO · PHPenampangEN

Thank you, Honourable Member. Speaker, under the Thirteenth Malaysia Plan, as in the document that has already been agreed in this Parliament, the ministry will introduce legislation relating to social enterprises during the period of the Thirteenth Malaysia Plan.

This is to make the enterprises that have been given existing endorsement more sustainable with the legislation, whatever it is, that we will develop. That is why we encourage the establishment of social enterprises through the cooperative movement and not in the form of CSR alone, as the Honourable Member mentioned earlier.

The Kalabakan Sustainable Oil Palm Planters Cooperative, for example, I believe will be a long-term venture because it involves a plantation sector with a lengthy planting period. And we want to see Kalabakan also develop in the village homestay sector, tourism for example.

With the potential that exists, bordering Kalimantan, this potential needs to be developed. Therefore, I welcome cooperation with the Sabah State Government, and I welcome cooperation with the Kalabakan District Office.

I myself welcome cooperation with the people's representative for Kalabakan, Honourable Member. How do we ensure that social enterprises in Kalabakan are sustainable. At the ministry level, we will develop a specific legislation because this is a major focus of ours in the forthcoming Thirteenth Malaysia Plan. Thank you.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Threat of illegal hunting against the Borneo pygmy elephant requires integrated ecosystem conservationSpecial Chamber

Madam Speaker, with reference to the matter above, I wish to move a motion on the issue of government governance under the Standing Orders. This motion is addressed to the Honourable Minister of Natural Resources and Environmental Sustainability to seek an explanation regarding the serious threat of illegal poaching of the Borneo pygmy elephant, which requires integrated ecosystem conservation.

For your information, the Borneo pygmy elephant is increasingly becoming the target of illegal poaching in Kalabakan. Three cases of Borneo pygmy elephant killings have been reported. These include the tragic incident in which an elephant was found dead without its head and legs. This cruel act clearly violates humanitarian ethics and poses a serious threat to this endangered species. The loss of every elephant has a significant impact on the survival of the population and the stability of the Borneo tropical rainforest ecosystem, where the Borneo pygmy elephant plays an important role in maintaining ecological functions and the formation of natural habitats.

According to reports, high demand for elephant ivory in the black market is the main driver of illegal poaching. The high value of ivory makes the Borneo pygmy elephant a target for poachers who ignore the long-term impact on biodiversity. This situation demands immediate and integrated action from the authorities to protect this unique species.

Accordingly, I wish to raise several questions to the ministry, namely:

(i) what concrete steps the Ministry and related agencies are taking to investigate these three incidents, including legal action against the perpetrators?;

(ii) how the government plans to enhance monitoring of the Borneo pygmy elephant in critical areas such as Maliau Basin and Kalabakan, including proposals for installing satellite collars and the use of GIS technology to track their movements effectively?; and

(iii) what mechanisms of cooperation exist between the government, non-governmental organisations and the local community to ensure the continued conservation of this species?

Therefore, immediate action is very important because without firm law enforcement, the population of the Borneo pygmy elephant risks drastic decline, threatening ecosystem functions and also Borneo's biodiversity heritage.

The use of modern monitoring technology, integrated patrols, as well as education and the involvement of local communities will not only reduce the risk of illegal poaching, but also foster social awareness of conservation responsibilities.

Thus, my hope is great that the preservation of ecosystem integrity and the sustainability of Borneo's biodiversity become a main agenda of the ministry, with collective action based on evidence implemented consistently and with commitment. So that the continuity of endangered species such as the Borneo pygmy elephant can be preserved. That is all, thank you.

I invite the Honourable Minister to reply.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

Thank you, Mr Speaker, and thank you, Honourable Member.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

Kalabakan. The pygmy elephant is a species protected under Schedule 1, a fully protected species, under the Wildlife Conservation Enactment Sabah 1997.

The Sabah State Government, through the Sabah Wildlife Department (JHLS), takes the incident of illegal poaching of the Borneo pygmy elephant in Kalabakan seriously.

JHLS is investigating this incident and will take action in accordance with the laws in force.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

To strengthen the enforcement of control and compliance concerning the pygmy elephant, JHLS has placed several community ranger control posts in critical areas such as Maliau Basin and Kalabakan. JHLS also cooperates with the Sabah Forestry Department, Yayasan Sabah and non-governmental organisations (NGOs) in carrying out monitoring and patrols along the route from Kalabakan to the Maliau Basin area. At present, JHLS, with NGO cooperation, has installed two satellite collar units in the Maliau Basin area and is carrying out monitoring to observe the movements of elephants and act as an early warning system. JHLS will place more satellite collar installations, particularly in the Kalabakan–Sapulut area.

Taking into account the importance of conserving the pygmy elephant, JHLS has developed the Borneo Elephant Action Plan 2020–2029 as a guide in its management in Sabah and has outlined a tri-partnership-based cooperation mechanism involving the government, NGOs and academia.

The government plays the role of policy maker and carries out enforcement. Meanwhile, NGOs and academia contribute scientific and field expertise.

The local community plays the role of frontline defenders through the establishment of trained Community Elephant Response Teams (CERT) and as the eyes and ears of JHLS, and ensures the survival of the pygmy elephant species. In addition, JHLS constantly enhances mitigation measures through the implementation of the following steps:

(i) installing electric fences to reduce the entry of elephants into plantation areas;

(ii) carrying out integrated enforcement operations with security agencies, increasing the frequency of patrols and setting up road blocks at strategic locations;

(iii) enhancing cooperation with the community and plantation owners to help channel information to combat wildlife crime; and

(iv) providing incentives and strengthening cooperation with the Sabah Ministry of Tourism, Culture and Environment through the offer of a reward of RM10,000 to informants who lead to the arrest and prosecution of offenders. This initiative is introduced to encourage witnesses to come forward and assist in investigations.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

That is all, thank you.

I invite the Honourable Member for Kalabakan to ask a question, if any.

Thank you, Madam Chairman. Since the answer...

Speaker, yes.

Yang di-Pertua.

Thank you, Madam Speaker. Forgive me.

Does the government intend to re-evaluate the effectiveness of the existing policy and action plan by incorporating a data-based governance component, so that monitoring of the pygmy elephant population can be carried out through an early warning system or early warning system that is integrated between state and Federal agencies? So, there must be cooperation between state and Federal agencies.

That is all my question. Thank you.

I invite the Honourable Minister to reply.

Dato’ Sri Huang Tiong SiiSUPP · GPSSarikeiEN

Thank you, Madam Speaker, and thank you, Honourable Member for Kalabakan.

As I have explained earlier, the Borneo Elephant Action Plan 2020–2029 has been developed as an aid, as a guide in the management of pygm elephants in Sabah, involving cooperation among various stakeholders including the government, non-governmental bodies, academia and the community.

In terms of data and technology, GPS and a smart patrolling system have been introduced through the Khazanah Integrated Operation (OPK) programme and community rangers to strengthen integrated enforcement. In addition, satellite technology is used to monitor the movements of pygmy elephants, acting as an early warning system. That is all, thank you.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Issue of Addressing Elephant–Human Conflict in Mersing Parliamentary ConstituencySpecial Chamber

Mr Speaker, I raise the issue of the increasingly acute human-elephant conflict in Johor. In several districts such as Mersing, Kluang and Kota Tinggi, the people face losses due to elephant attacks on orchards, fruit farms, plantations, and even road accidents involving elephants crossing main routes. There have also been incidents of elephant attacks on humans resulting in injuries and deaths.

The government does have the Wildlife Attack Property and Crop Damage Compensation Assistance Scheme, but complaints I have received show that its claims take far too long and the rate of compensation

...rather than being commensurate with the losses. This causes smallholder planters, who are already burdened by the high cost of living, to become increasingly distressed. I wish to stress that the people do not reject conservation efforts. The Asian elephant is a national heritage protected under the Wildlife Conservation Act 2010. However, the government must ensure a balance so that elephant conservation does not sacrifice the welfare of the people.

We also need to look at the aspects of prevention and habitat management. This conflict occurs because forest areas that serve as elephant habitat are shrinking due to development, plantation agriculture and logging. If the government is genuinely serious, then the gazettement of forest reserves, ecological corridors and wildlife crossings must be expedited. Projects such as the Central Forest Spine (CFS) and the wildlife crossing at Kahang–Mersing must be closely monitored so that they do not remain merely names on paper.

In the context of Johor, there is already the Johor Elephant Sanctuary (JES), which should function as a centre for conservation, education and elephant conflict management. The question is, how effective is this centre in reality? Does it function merely as a symbol, or has it succeeded in reducing conflict and benefiting the local community? If its role remains limited, the government must improve it in terms of facilities, manpower and integration with the local community.

I would like to ask several questions. First, is the government prepared to review the effectiveness of the compensation scheme for losses caused by wildlife attacks, including more realistic compensation rates and a faster and more transparent process?

Second, the list of applicants for the Bantuan Kerugian Harta Benda dan Tanaman Akibat Serangan Hidupan Liar in the Mersing Parliamentary constituency from 2024 onwards, and the list of those already approved?

Third, the current status of Johor's first wildlife crossing project on route FT50 (Kahang–Mersing).

Fourth, the extent of the effectiveness and role of the Johor Elephant Sanctuary (JES) in reducing elephant–human conflict in the areas concerned.

Fifth, what steps will be taken to improve the effectiveness of special team operations in tackling wildlife conflict, including the deployment of PERHILITAN officers in hotspots and the adoption of new technologies such as early warning systems, integrated electric fencing and drones to monitor elephant movements in high-risk areas?

That is all, thank you.

The Honourable Minister is asked to respond.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

Thank you, Mr Speaker and the Honourable Member for Mersing.

The Ministry of Natural Resources and Environmental Sustainability (NRES), through the Department of Wildlife and National Parks (PERHILITAN) Peninsular Malaysia, is concerned about the welfare and well-being of the people, in particular

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

Malaysia towards orchard owners and livestock breeders who suffer losses, destruction and damage to crops or livestock caused by wildlife such as elephants.

Therefore, the government has introduced the Bantuan Kerugian Harta Benda dan Tanaman Akibat Serangan Hidupan Liar (BKHT) initiative, which is provided on a one-off basis to target groups such as village residents, local communities and Orang Asli who suffer damage or destruction of property and crops due to wildlife attacks, subject to the conditions that have been determined.

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

To enhance the effectiveness of the BKHT by the PERHILITAN Department in reviewing and updating the standard operating procedures, the Bantuan Kerugian Harta Benda dan Tanaman akibat serangan hidupan liar initiative and this SOP came into force on 1 January 2025.

The improvements to the SOP for BKHT are as follows:

(i) expansion of the list of agencies receiving BKHT complaints to the departments and agencies responsible for crops, livestock and fishermen as appropriate in Peninsular Malaysia, the State of Sabah and Sarawak;

(ii) realignment of the rate of applications to be approved by the BKHT committee;

(iii) improvement of the evaluation and approval stages so that assistance can be disbursed immediately through the prescribed mechanism; and

(iv) improvement of the BKHT processing period from receipt of a complete application until disbursement of assistance, which has been accelerated to 44 working days for applications at a rate of RM10,000 and below.

From 2024 until 29 September 2025, a total of 57 BKHT applications were received for the Mersing Parliamentary constituency, and 55 applications were approved, with a total amount of assistance of RM306,419.50.

Johor's first Wildlife Crossing Project on route FT50, the Batu Pahat, Jemaluang, Johor route, with a construction cost of RM30 million, is expected to be completed in 2028. Construction works began in July 2025, covering the ecological corridor network Central Forest Spine (CFS 2) Primary Linkage 1, the forest reserves HS Labis Timur, HS Mersing and HS Lenggor, Mersing, Johor Darul Takzim.

The State of Johor is estimated to have an elephant population of 120 to 160 elephants, covering the districts of Kluang, Kota Tinggi, Mersing and Segamat.

On average, the PERHILITAN Department receives about 100 complaints of elephant disturbance each year and losses of about RM1.1 million a year.

Therefore, the Federal Government and the State Government of Johor have taken initiatives and long-term measures to manage this elephant conflict through the construction of

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

the Johor State Elephant Sanctuary, Johor Elephant Sanctuary (JES), covering 72.993 hectares, to reduce the problem of human–elephant conflict in the State of Johor.

In addition, JES plays the following roles:

(i) reducing the threat of conflict elephants through capture-and-translocation methods and in-situ placement in designated release areas;

(ii) enhancing the capacity of Managed Elephant Ranges (MERs) through habitat management as specified in the National Elephant Conservation Action Plan (2023–2030), National Elephant Conservation Action Plan (NECAP 2.0); and

(iii) providing opportunities for sustainable eco-tourism activities that can generate the economy and increase income for the local community.

The effectiveness of JES in reducing elephant and human conflict is targeted at up to 50 per cent within five years after the JES development project is fully completed in 2026. It provides protection to the areas of Kampung Lukut, Kampung Temenin, Batu Empat, Kampung Paya Lempah, Kampung Bukit Lintang, Kampung Sepak Hulu, Kampung Bukit Samsu, LGM Pelepah and LGM Permatang.

District PERHILITAN Department staff carry out daily monitoring in elephant hotspots in the districts of Kluang, Kota Tinggi, Mersing and Segamat. In addition, a special team, the Elephant Capture Unit (UTG), comprising 15 staff members, has been established in the State of Johor to assist in managing human–elephant conflict, capture operations and elephant translocation.

The PERHILITAN Department has developed the National Elephant Conservation Action Plan (2023–2030), National Elephant Conservation Action Plan (NECAP 2.0), to assist in implementing more comprehensive elephant management, including raising public awareness of conflict management towards the concept of co-existence between humans and elephants.

Among the measures implemented by the PERHILITAN Department in line with the aspirations of NECAP 2.0 are the following:

(i) construction of three permanent elephant electric fence systems (SPEG) from 2010 to 2013 with a total length of 56.8 kilometres in the human–elephant conflict areas in Johor;

(ii) construction of the Johor Elephant Sanctuary (JES), which began operating in September 2020 to reduce elephant conflict in agricultural and settlement areas in the State of Johor;

(iii) implementation of three food banks for elephants in Johor in 2024, namely the Panti Elephant Food Bank, the Ladang Landak (KLK) Elephant Food Bank and the Orang Asli Elephant Food Bank, to improve habitat quality and the wildness of elephants

Dato’ Sri Huang Tiong SiiSUPP · GPSDeputy Minister of Natural Resources and Environmental Sustainability · SarikeiEN

through the management and enrichment of food sources and habitat;

(iv) implementing elephant translocation operations in the State of Johor to restabilise the population and relocate elephants that have strayed from their habitat and caused conflict between humans and elephants. RM600,000 has been allocated by the State Government of Johor to implement this programme for the period beyond 2025 and 2026; and

(v) use of satellite collar technology on 17 elephants in the states of Kedah, Perak, Pahang, Terengganu and Johor to track elephant movements, which will function as an early warning system for human–elephant conflict.

That is all, thank you.

The Honourable Member for Mersing is invited to ask his question.

Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. I welcome the answer given by the Deputy Minister just now, and I only want to obtain additional information regarding the 27 who applied and the 55 who were approved, and what the total amount approved is, because one of the applicants is my own teacher, Cikgu Zaliha. She has applied for almost a year and still has not had her application approved. And yesterday I asked the applicant again and was informed that indeed it has still not been approved, and the application was made in November last year. So, if we can get the full list, then we in Mersing can conduct a check. Those who applied may have applied more than once. So, how many have been received at the ministry level and how many were approved?

And the second is related to the SOP that was said to have been improved starting 1 January. Are there conditions such as the title, for example, if the land is planted with something different, for example the title is for coconut cultivation but durian or something else is planted, which becomes one of the reasons why applications are rejected? Because I understand that at the State of Johor level, according to the information I received, one of the reasons for rejection is the condition in the title, that the method of cultivation in the title is not the same as what is planted in the orchard.

And next, regarding the corridor, I hope this matter can be expedited, because according to the answer just now, it was said that it began in July. But when I passed through the area, although this corridor is in the Sembrong Parliamentary constituency, it does pass through Mersing. What I saw were only trees that had been cut, but until now there has been no work carried out. And many people have asked me because the signboard, where trees have been cut, has been put up and this is within the forest reserve, yet there is no machinery at all or any sign that the project will begin. That is all, thank you.

The Honourable Minister is asked to respond.

Dato’ Sri Huang Tiong SiiSUPP · GPSSarikeiEN

Thank you, Mr Speaker, and thank you, Honourable Member. Just now the Honourable Member mentioned, about that, which has been allocated, already received, or already applied for but not yet received, or not yet known, the correct one, [Unclear] the ones already approved. But I will review it again, I will later give the answer, I will give the detailed data, the correct data, because every day it changes, right.

Then the second question, that thing just now about the matter, about that event, there is a letter that has been stipulated, don't worry. In our ministry, there is indeed a letter that has been stipulated, don't worry. I, I can take responsibility, it has been approved. One more answer, because they have already cut, planted [Unclear], they changed it to durian, changed to durian, right?

That one, I will later, I will call my officer to go and look on the spot to see whether it is correct or not? I can later give the answer to you, Honourable Member, don't worry. I can take responsibility for this. I will later ask my officer to go down to the place and check again, to see whether it is correct or not. If not, later I will take action according to our ministry's conditions. Don't worry, oh, thank you, that's all.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Issue of Mersing Marine Tourism IndustrySpecial Chamber

Mr Speaker, I wish to raise several issues frequently raised by tourism boat operators in the Mersing Parliamentary constituency. First, licensed boat operators [Unclear] face problems when the Malaysian Marine Department restricts boat operations to within 10 nautical miles from the Mersing Passenger Jetty. I raised this issue in the Special Chamber in October 2023, but until now there has been no concrete solution. I would like to ask about the government's readiness to review the conditions of the JMS licence, including amending the Mersing Port Limits, so that marine recreation and tourism activities can be carried out sustainably.

I would also like to ask whether the government is prepared to review the passenger limit of JMS boats, which is currently only allowed 12 persons, even though there are large-sized boats that are able to accommodate more passengers safely.

Second, the implementation of the Dual Licence for JMP licensed boats in the south-eastern waters of Peninsular Malaysia, covering Teluk Gading and Pulau Seri Buat in Rompin as well as Pulau Besar and Pantai Mersing in Johor. This step is welcomed because it opens new space for tourism boat operators. However, the mandatory minimum requirement of two engines has caused anxiety. Not all operators can afford the high cost of replacing or adding engines.

Moreover, this requirement is not imposed under the JMS licence. If the main objective is safety, the government needs to consider other more practical alternatives.

Third, concerning the circular prohibiting wooden ships or boats from carrying petroleum, diesel, petrol and gas cylinder cargo after November 2025. After this date,

only aluminium or steel ships or boats are permitted. In Mersing, cargo companies that operate still do not possess aluminium or steel vessels. If their operations are stopped, it will affect chalet and resort operators on Tioman Island and other islands in Mersing. Furthermore, aluminium or steel vessels are said to have difficulty passing through the shallow Kuala Mersing channel. Has the government carried out a practical assessment of the implications of this policy?

Fourth, the government recently announced diesel subsidies to ferry operators, passenger boats and RORO ferry services to the main islands including Pulau Tioman. My question is, will this initiative also be extended to boat and ferry operators to the Mersing archipelago who depend on the eco-tourism sector? If not, Mersing operators will be sidelined even though they also face the same high operating costs.

Fifth, I have been informed that the dredging work at river mouths in the Mersing, Batu Pahat and Muar areas has been postponed to 2027. This postponement has a major impact on tourism boats and fishermen at Kuala Sungai Mersing, who are often prevented from entering and leaving due to sand deposits. I urge the government to reconsider this postponement for the sake of safety and the economic sustainability of the local people. That is all, thank you.

The Honourable Minister is asked to respond.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Mr Speaker, thank you, Honourable Member. He has five questions, Honourable Member? So, we will answer them according to the questions.

First question. For the information of the Honourable Members, the licensing process for passenger boats is based on the requirements under the provisions of the Boat Rules 1953, made under sections 445 and 483 of the Merchant Shipping Ordinance 1952.

Referring to Rule 9(1), limitation of number of passengers: "No licensed boat shall carry a greater number of passengers than the number allowed by its license or under these Rules". For licensed boats, the permitted number of passengers is a maximum of only 12 passengers. However, if there is a need, boat owners may apply for approval to carry more than 12 passengers through a passenger certificate to be issued by the Malaysian Marine Department under the provisions of section 208 of the Merchant Shipping Ordinance 1952, subject to the conditions that must be complied with and the eligibility of the boat as follows:

(i) only for enclosed-hull boats;

(ii) for outboard-engine boats, the maximum number of passengers is limited to only 36 passengers;

(iii) the boat must pass the inclining test; and

(iv) pass the inspection conducted by the Department's Inspector.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Meanwhile, under Rule 9(3), limits within which boat may ply, namely, "No licensed boat shall ply or go beyond the limits (if any) specified in its license and no such boat other than a fishing boat shall leave port limits without having obtained a port clearance". Referring to the existing Mersing Port Limits, the area of the port limits is approximately 20 square nautical miles, where the projected distance to sea is only three nautical miles. Based on the existing port limits, licensed boats may only operate within the port limits, that is, up to three nautical miles only.

However, to meet the operational needs of boats, the Malaysian Marine Department has allowed the operating limit of licensed boats to be extended up to 12 nautical miles administratively under the power of the Port Officer, which enables licensed boats to operate to islands within 12 nautical miles from the Mersing passenger jetty.

To meet the needs and current demand of licensed boat operations, which are increasing in line with the eco-tourism sector, the Malaysian Marine Department proposed to extend the Mersing Port Limits in 2021, covering the area projected from Tanjung Penyabong to Tanjung Tenggara.

The proposal to extend the port limits was reviewed and revised in 2023 and proposed in phases, covering the extension of the Mersing Port Limits Phase 1 and Phase 2. Where Phase 1 covers a distance of as far as 20 nautical miles projected to sea, covering all island groups in Mersing waters except Pulau Pemanggil and Pulau Aur.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Manakala bagi peluasan fasa kedua ialah perairan had pelabuhan Mersing yang mengunjur sehingga 50 batu nautika ke laut yang meliputi Pulau Pemanggil dan Pulau Aur. The Ministry of Transport (MOT) received a proposal paper on the expansion of the Mersing port limit, updated, from the Southern Region Malaysian Marine Department (JLMWS) on 18 April 2025. Pada dasarnya, MOT telah bersetuju cadangan pengubahan ini dilaksanakan dalam dua fasa. Dalam hal ini, MOT sedang mengambil tindakan sewajarnya bagi memuktamadkan cadangan pengubahan had pelabuhan Mersing bagi fasa satu termasuk proses pewartaan.

Manakala peluasan bagi fasa dua akan disemak semula untuk pewartaan mengikut keperluan semasa bagi tempoh 10 tahun yang akan datang.

Soalan kedua, pelaksanaan pelesenan dua negeri iaitu Dwi-Lesen. Bagi perairan Rompin, Pahang dan Mersing, Johor adalah selaras dengan pertumbuhan ekonomi dan memenuhi permintaan industri pelancongan di kawasan tersebut. Pegawai pelabuhan telah mengambil langkah yang wajar dan bersesuaian mengikut peraturan operasi standard. Pelesenan bot sedia ada dan telah ditambah baik untuk Dwi-Lesen.

Keperluan mandatori bagi dua enjin bot, dua enjin bagi JMP iaitu apa nama plat lesen bot untuk penumpang ya. Merupakan keperluan sedia ada yang telah ditetapkan untuk mana-mana bot yang membawa penumpang. Ini adalah bagi memastikan sekiranya enjin bot mengalami kerosakan di tengah laut, bot tersebut masih mampu dan sampai ke destinasi dengan selamat.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Soalan ketiga pula. The Southern Region Malaysian Marine Department (JLMWS) telah mengeluarkan Pekeliling Pelabuhan pada Mei 2022 berhubung larangan bagi kapal bot yang membawa kargo petroleum iaitu diesel, petrol, tong gas yang beroperasi di antara Mersing dan pulau-pulau sekiranya — sekitarnya bertarikh 14 Ogos 2022 dan berkuat kuasa 1 September 2025. Tempoh masa tiga tahun daripada tarikh arahan ini dikeluarkan adalah sebagai makluman awal kepada semua operator kapal dan masyarakat perkapalan amnya untuk membuat persiapan sewajarnya adalah mencukupi bagi memastikan setiap arahan yang dikeluarkan oleh Pegawai Pelabuhan dapat dipenuhi sepenuhnya.

Selain itu, aspek keselamatan pelayaran adalah menjadi keutamaan khususnya bagi kapal atau bot yang membawa kargo mudah terbakar. Justeru, kapal atau bot hendaklah berada dalam keadaan yang sesuai dan sepadan dengan jenis kargo yang dibawa selaras dengan keperluan keselamatan pelayaran. Untuk makluman, the Southern Region Malaysian Marine Department (JLMWS) telah memberikan kelulusan sementara secara pentadbiran kepada mana-mana operator yang telah mengambil inisiatif untuk menukarkan bot kayu kepada bot besi sehingga bot yang dibina siap. Pada ketika ini, terdapat dua buah bot yang dibenarkan untuk beroperasi bagi mengangkut kargo diesel, petroleum dan tong gas daripada 14 buah sebelum ini.

Soalan keempat, terdapat tiga syarikat yang telah mendapat kelulusan subsidi diesel di Mersing. Syarikat dan senarai bot adalah seperti di bawah:

(i) Bistari Gemilang Travel Sdn. Bhd. Jumlah ferinya adalah tujuh buah;

(ii) Bistari Gemilang Shipping Sdn. Bhd. sebuah; dan

(iii) Juara Mutiara Sdn. Bhd. sebuah.

Senarai bot bagi syarikat berkenaan pula adalah:

(i) Wawasan 1, Mersing–Tioman;

(ii) Bluewater 8, Mersing–Tioman;

(iii) Bluewater 10, Mersing–Tioman;

(iv) Bluewater 11, Mersing–Tioman;

(v) Gemilang, Mersing–Tioman;

(vi) Bistari 2, Mersing–Tioman;

(vii) Bistari 1, Mersing–Tioman;

(iv) Aura, Mersing–Tioman;

(v) Juara Mutiara 2, Mersing–Tioman.

Ini adalah untuk feri domestik dan RORO.

Soalan kelima pula — ini panjang sikit jawapan dia. Jabatan Laut Malaysia memutuskan supaya projek pengerukan di Kuala Sungai Mersing ditangguh buat sementara waktu dan dimohon semula dalam RMK13 Rolling Plan Two berdasarkan justifikasi-justifikasi seperti yang berikut.

Satu, pertimbangan teknikal dan alam sekitar serta kajian teknikal berkaitan geoteknik, senario dasar laut, keberkesanan kejuruteraan. Jabatan Laut Malaysia telah mengenal pasti terdapat keperluan untuk menilai senario sebelum dan selepas kesan perubahan dasar laut dan haluan kapal bagi memastikan projek memberikan pulangan yang optimum kepada kerajaan.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Penilaian sebelum dan selepas kerja-kerja pengerukan. Kesan perubahan dasar laut dan haluan kapal akan memberikan gambaran sebenar keadaan semula jadi di kawasan yang dikeruk, di samping dapat mengawal impak yang terhasil daripada kerja-kerja pengerukan yang dilaksanakan. Mengenal pasti haluan kapal semula jadi di kawasan perairan tersebut juga membolehkan Jabatan Laut Malaysia merangka alur pelayaran mengikut aliran air secara semula jadi dan dijangka dapat mengurangkan kuantiti enapan yang akan dikeruk dan seterusnya mengurangkan kos projek.

Kedua, analisa jangka panjang keperluan pengerukan dan keberkesanan campur tangan kejuruteraan. Jabatan Laut Malaysia adalah agensi yang melaksanakan kerja-kerja pengerukan di alur pelayaran di perairan Malaysia.

Berdasarkan rekod, didapati bahawa kos bagi melaksanakan pengerukan adalah semakin meningkat dari semasa ke semasa. Mengambil kira penjimatan kos serta pulangan yang menguntungkan kerajaan, Jabatan Laut Malaysia mencadangkan supaya analisa jangka panjang keperluan pengerukan dan keberkesanan campur tangan kejuruteraan dilaksanakan.

Analisa ini bertujuan untuk mengenal pasti daya maju projek-projek berkenaan dan secara tidak langsung dapat mencadangkan struktur kejuruteraan yang sesuai di muara-muara sungai yang boleh bertindak untuk mengurangkan pemendapan, melancarkan keluaran air sungai ke laut dan memanjangkan tempoh alur pelayaran yang telah dikeruk. Jabatan Laut Malaysia akan menjemput wakil Institut Penyelidikan Air Kebangsaan Malaysia (NAHRIM) untuk menganggotai jawatan kuasa spesifikasi pada masa hadapan bagi mendapatkan pandangan dan maklum balas berkaitan kajian-kajian yang diperlukan di kawasan pengerukan tersebut.

Jenis mendapan dan kaedah pengerukan. Ini teknikal ni YB.

[Dicelah] Boleh eh? Ini boleh tahanlah dia tapi soal teknikallah. If you want bertulis, boleh juga. Jadi, saya harap yang selebihnya ini saya akan apa nama berikan secara bertulislah ya? Okey. Terima kasih.

Ya. Nanti bagi secara bertulis. Ada soalan tambahan oleh Yang Berhormat Mersing? Silakan.

Terima kasih Mr Speaker. Terima kasih Yang Berhormat Timbalan Menteri. Saya cuma nak komen apa — ulas — tanya sedikit berkaitan soalan nombor 4 tadi.

Yang Berhormat Timbalan Menteri sebutkan semuanya adalah operasi ke Pulau Tioman dan sebagai mana soalan asal saya, adakah kementerian bercadang untuk meluaskan juga subsidi ini untuk sektor di kawasan kepulauan Mersing.

Kerana kat Mersing pun kita banyak pulau-pulau dan pulau ni macam tadi yang Yang Berhormat pun ada sebut, Pulau Aur, Pulau Pemanggil itu sangat jauh. Dari jeti penumpang tu ada lebih dua jamlah.

Jadi, kos tu sangat besar dan sebelum ini pun ketua kampung ada pernah buat isu berkaitan dengan minta supaya kerajaan memberikan juga subsidi kepada pengusaha-pengusaha bot feri dan bot pelanconglah untuk yang ke pulau-pulau jauh ni khasnya. Kerana satu hala tu dia boleh pergi sampai RM100 untuk satu hala dan tidak ada subsidi pun untuk — maknanya tidak ada beza antara local ataupun pelancong. Jadi, orang tempatan yang duduk kat pulau ni biasa memang tidak ada sumber pendapatan yang sangat besar, jadi RM100 untuk satu hala tu sangat membebankanlah untuk penduduk tempatan. Jadi, diharapkan pihak kementerian dapat menimbangkan supaya diberikan juga

subsidi ini kepada bukan sahaja kepada bot-bot ke Pulau Tioman sahaja tapi bot- bot di perairan kepulauan Mersing.

Dan kedua berkaitan dengan pengerukan, kami faham. Sebagai Timbalan yang menjawab sebut tadi, ada perkara-perkara teknikal yang perlu diberi perhatian selanjutnya tapi saya sangat berharapkan supaya perkara ini disegerakan kerana kami risau, mungkin nak tunggu 2027 itu, air pasang pun bot tak boleh lalu dah. Dalam keadaan sekarang ini pun menunggu air pasang yang betul-betul pasang baru boleh lalu. Ada sesetengah bot yang terpaksa menunggu timing yang betul-betul.

Dan sekiranya ditunggu sehingga 2027, dua tiga kali lagi kita berhadapan dengan monsun, dikhuatiri air pasang pun feri-feri atau bot-bot ini dah tak boleh lalu dah sebab nak tunggu sampai 2027 ini. Jadi, itu sahaja dan terima kasih.

Terima kasih. Yang Berhormat Menteri, sila menjawab.

Terima kasih Yang Berhormat.

Jadi, berkenaan dengan yang permohonan itu tadi ialah pertama sekali kita nak meluaskan had itu tadi, had apa nama port limit itu tadilah. Jadi, bila port limit ini dapat diluaskan, dari sanalah akan dapat dipertimbangkan tentang permohonan untuk buat [Unclear] jauh lagi.

Dan keduanya ialah tentang — iaitu berkaitan dengan ada tadi ini ya. Pada masa ini, iaitu Jabatan Laut dalam proses mengumpul maklumat daripada operator bot lesen seperti maklumat tentang jenis enjin, diesel, petrol, jumlah penggunaan minyak dan lain-lain untuk diangkat kepada Kementerian Perdagangan Dalam Negeri dan Kos Sara Hidup (KPDNHEP) ya dan Kementerian Kewangan (MOF) untuk pertimbangan tentang yang berkaitan subsidi tadi. Terima kasih.

Terima kasih, tapi saya nak peringatkan sikit. Kalau boleh soalan jawapan-jawapan yang patut dibekalkan itu dibagi segeralah. Jangan janji macam soalan pertama itu tunggu agak lama ya.

Saya mohon Menteri untuk dia memberi perhatian perkara ini. Silakan setiausaha.

Special Chamber — Motion on a specific matter of public importance requiring urgent attention under S.O. 18(1) — Current Status of Royal Malaysia Police (PDRM) Investigation regarding Individuals Believed Responsible for Supplying Drugs to a Malaysian Citizen, Encik Pannir Selvam Pranthaman, Who Was Sentenced to Death in SingaporeSpecial Chamber

Ahli-ahli Yang Berhormat, menurut keputusan yang telah dibuat di Dewan Rakyat pada hari ini, satu usul di bawah Peraturan Mesyuarat 18(1) telah dibenarkan untuk dirundingkan di Kamar Khas pada hari ini. Saya benarkan ucapan oleh Ahli Yang Berhormat Bukit

Gelugor dan Ahli Yang Berhormat yang lain dan diikuti Yang Berhormat Menteri menjawab. Tapi semasa Yang Berhormat mengusulkan, saya tak benarkan mencelahlah kecuali bila mana Menteri memberikan jawapan.

Oleh itu, dipersilakan Yang Berhormat Bukit Gelugor untuk berucap.

Penjelasan [Unclear] . Kita boleh tak bertanya selepas penjelasan oleh Yang Berhormat Timbalan Menteri dibuat. kita boleh minta penjelasan seterusnya ke?

Dia ada prosedur dia. Yang Berhormat bagi usul, lepas itu boleh diikuti oleh Yang Berhormat lain kalau ada.

Menteri akan jawab. Semasa Menteri jawab itu boleh ada pencelahan.

Ya, okey terima kasih. Terima kasih Madam Speaker. Seperti yang telah pun dinyatakan tadi, usul di bawah Peraturan Mesyuarat 18(1) telah pun dibenarkan pagi ini di Dewan Rakyat. Berkenaan dengan seorang warga Malaysia yang kini ditahan di Singapura iaitu Encik Pannir Selvam Pranthaman, yang telah pun dijatuhkan hukuman mati di Singapura yang dijadualkan untuk dilaksanakan pada 8 Oktober 2025, iaitu esok hari, pada hari Rabu.

Untuk makluman Madam Speaker, pada 27 September 2025, Encik Pannir Selvam telah ditemu bual oleh pegawai kanan daripada Polis Diraja Malaysia (PDRM) di Penjara Changi, di Singapura. Temu bual tersebut telah berlangsung selama kira-kira tiga jam di mana Encik Pannir Selvam tersebut telah memberikan maklumat berkenaan individu-individu yang dipercayai bertanggungjawab menyerahkan dadah kepadanya di Malaysia untuk diseludup ke Singapura.

Maklumat yang tersebut berkemungkinan boleh membawa kepada pendakwaan terhadap dalang-dalang di sebalik jenayah penyeludupan dadah di Malaysia. Kerjasama dan bantuan yang diberikan oleh Encik Pannir Selvam tersebut berpotensi juga untuk melemahkan kegiatan sindiket penyeludupan dadah rentas sempadan ini yang secara langsung Madam Speaker akan memberikan manfaat kepada Malaysia, juga kepada Singapura.

Jadi dalam hal ini, saya ingin memohon kepada Yang Berhormat Timbalan Menteri yang berada hari ini untuk menjelaskan sama ada PDRM ada menjalankan apa-apa siasatan berhubung dengan kes ini. Dan saya telah pun menggariskan betapa pentingnya persoalan ini di Dewan Rakyat pagi tadi dan saya tidak akan mengulangi yang sama. Itu soalan saya tadi. Sekian, terima kasih.

Silakan Yang Berhormat lain jika ada.

Terima kasih Madam Speaker.

Sebenarnya isu ini sangat diperkatakan. Terima kasih diberi peluang. Hanya dua persoalan saja kepada Timbalan Menteri kita. Adakah Pannir pernah menimbulkan nama Shanmugam dan Dinis sebagai dalang atau mastermind di belakang sindiket penyeludupan dadah dari Malaysia ke Singapura?

Dan kedua, adakah Shanmugam dan Dinis tersebut kini dalam tahanan PDRM?

Minta maaf, ini saya just untuk rekod, merekodkan soalan tersebut.

Boleh, silakan. Saya benarkan.

Terima kasih.

Ada dua persoalan yang timbul yang ingin saya timbulkan di sini berikutan dengan apa yang telah pun saya sebut tadi.

Pertamanya adalah berkenaan dengan prosedur. Saya mengisytiharkan Puan bahawa saya merupakan peguam untuk satu kes yang lain untuk siasatan berkenaan dengan seorang mendiang bernama Teoh Beng Hock. Now di dalam kes tersebut, kami telah pun dimaklumkan bahawa prosedur yang berkenaan dengan siasatan. Adalah bahawa Kertas Siasatan ataupun dengan izin Investigation Papers (IP) akan — selepas siasatan dihabiskan, akan dirujuk kepada Timbalan Pendakwa Raya ataupun TPR untuk membuat keputusan sama ada untuk siasat lebih lanjut, NFA dan sebagainya. Itu akan diputuskan at the end of the day dengan izin oleh pihak DPP ataupun Timbalan Pendakwa Raya.

Jadi, persoalan saya memandangkan prosedur tersebut yang merupakan prosedur yang established, adakah Kertas Siasatan berkenaan dengan maklumat yang diberi oleh Pannir pada 27 September 2025 dan siasatan yang berkenaan telah pun dirujuk kepada Timbalan Pendakwa Raya. Itu pertama.

Keduanya, sekiranya kertas siasatan itu belum dirujuk, memandangkan — kepada Timbalan Pendakwa Raya, memandangkan statement daripada Pannir hanya baru diambil pada 27 September, iaitu kurang daripada dua minggu lalu.

Sekiranya tidak dirujuk kepada TPR, bolehkah pihak Menteri mengesahkan bahawa pihak TPR belum membuat keputusan — sebarang keputusan berkenaan siasatan statement yang diambil dari Pannir pada 27 September 2025? Terima kasih.

Sekarang saya menjemput Yang Berhormat Menteri untuk menjawab.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Bismillahirrahmanirrahim. Mr Speaker. The Honourable Member for Bukit Jelutong.

Bukit Gelugor.

Bukit Gelugor. Dasar Luar Malaysia menghormati kemerdekaan dan kedaulatan sebuah wilayah melalui dasar tidak campur tangan dalam hal ehwal negara lain dan menghormati prinsip dengan izin the law of the land. Walau bagaimanapun, Kerajaan Malaysia khususnya melalui PDRM sentiasa memberikan kerjasama kepada pihak berkuasa mana-mana negara, termasuk Singapura dalam menangani kes pengedaran dadah merentas sempadan.

Pihak kerajaan telah meneliti kes Encik Pannir Selvam dan perkara ini telah dibincangkan dalam beberapa siri mesyuarat di peringkat interagency yang berkaitan. Termasuk pihak kementerian, PDRM, Wisma Putra dan Attorney General's Chambers (AGC). Dalam kes Pannir Selvam, beliau telah disabitkan untuk kes pengedaran dadah di Singapura dan dijadualkan untuk dihukum gantung mati berdasarkan bukti-bukti yang telah dikemukakan oleh pihak berkuasa Singapura dan telah diadili mengikut lunas undang-undang Singapura, mengikut prosedur yang ditetapkan rule of law.

Tuan Yang di-Pertua, semakan telah dibuat berdasarkan fakta kes semasa Encik Pannir Selvam tersebut yang didapati ditangkap di pintu masuk ke Singapura dengan dijumpai dadah di dalam seluar dalam dan juga dalam tempat simpan barangan di belakang motosikalnya.

Encik Pannir telah ditangkap pada 3 September 2014, namun PDRM tidak mendapat maklumat berkenaan tangkapan ke atas Encik Pannir sama ada melalui pihak berkuasa Singapura mahupun oleh keluarga Encik Pannir berhubung isu ini. Namun, susulan maklumat tangkapan ke atas Encik Pannir yang diterima daripada Central Narcotics Bureau (CNB) pada tahun 2019, PDRM telah melakukan risikan terhadap individu yang dikatakan terlibat dalam sindiket pengedaran dadah.

Namun, risikan mendapati kesemua individu terbabit tiada apa-apa kaitan dengan kes Encik Pannir. Ini fakta, Yang Berhormat.

Susulan dari surat bertarikh 1 Oktober 2024 kepada Yang Amat Berhormat Perdana Menteri dan laporan polis yang dibuat oleh kakak Encik Pannir pada 31 Oktober 2018, PDRM sekali lagi telah melakukan siasatan dengan melakukan tangkapan terhadap ketiga-tiga individu yang sama yang dinamakan oleh Puan Sangkari Pranthaman pada bulan Februari 2025 untuk siasatan terperinci.

Namun, masih tiada bukti mahupun apa-apa maklumat yang mempunyai operational value atau nilai operasi.

Selain itu, berdasarkan ulasan dalam perhakiman Mahkamah Singapura terhadap Encik Pannir, bukanlah dalam kategori courier iaitu selaku mangsa penyeludup mengambil kira fakta kes tangkapan Encik Pannir yang meletakkan dadah di kakinya dengan pita pelekat dan menyimpan dadah dalam ruang simpan barang di belakang motosikalnya. Sebelum itu, Encik Pannir juga didapati mengambil bekalan dadah tersebut yang disorokkan dalam saluran longkang.

Pihak PDRM telah berulang kali dalam meneliti dakwaan keluarga Encik Pannir Selvam berkenaan dengan sindiket dadah yang dikatakannya termasuk menjalankan siasatan ke atas nama-nama individu yang disebut oleh keluarga Encik Pannir Selvam.

Tuan Yang di-Pertua, pada awal tahun ini, Encik Pannir Selvam yang dijadualkan menjalani hukuman mati telah mendapat penangguhan ekoran usaha yang dilakukan oleh Yang Berhormat Menteri Dalam Negeri yang telah berbincang dengan rakan sejawatnya iaitu Menteri Dalam Negeri Singapura.

Seterusnya, usaha kali kedua yang dilakukan oleh Menteri Dalam Negeri sekali lagi mendapat persetujuan Singapura bagi PDRM diberikan akses bagi menemu bual dan merakam percakapan Encik Pannir Selvam.

Oleh dengan itu, pada 27 September 2025, PDRM melalui sepasukan pegawai penyiasat daripada Jabatan Siasatan Jenayah Narkotik sekali lagi telah bertemu dengan Encik Pannir Selvam di Penjara Changi bagi merakamkan percakapan beliau yang telah berlangsung selama empat jam dalam meneliti dan

...obtained all the information that may be useful and can help in investigating this matter.

In conclusion, in both of those periods, the ministry examined every aspect of the investigation and concluded that there was no reasonable ground to justify the PDRM expressing any support for the suspect. The information provided by the subject has no operational value for the PDRM in conducting further investigation. Thank you, Mr Speaker.

Yes, regarding the question I raised just now, the Honourable Deputy Minister, namely whether the Honourable Deputy Minister can confirm whether the IP of the investigation into this case, concerning the information or investigation taken on 27 September 2025, which is just less than two weeks ago. Was that information submitted through the investigation paper? Has that information been referred to the DPP? And did the DPP ever make a decision regarding that investigation?

In other words, apart from what the Ministry of Home Affairs has said, was this matter, the information given by Pannir, ever referred to the DPP by Pannir on 27 September this year? Who is that DPP? Please give the details, and what was the DPP's decision regarding the information given by Pannir on 27 September. Thank you, Madam.

The Honourable Member just raised [Inaudible] in police custody? I wish to inform that there is none in [Inaudible] police.

[Speaking without using the microphone]

No, no. That already exists.

Was the IP referred to the TPR? It was not referred to the TPR. The police opened an operations file to develop information.

However, there was insufficient evidence to proceed with the intelligence gathering. That is the statement. I want to conclude as follows, Honourable Member.

The ministry has, with great care, made various efforts, carried out further investigation by the PDRM, and found that no operational value was produced. The investigation has been carried out three times. Based on the intelligence gathering that has been carried out, the ministry found that there is no room to continue investigating this case further. Thank you, Honourable Member.

May I respond to one more supplementary question? With permission, the Honourable Deputy Minister has not answered my question. Has not answered my question, which is a simple question. I just want confirmation, with permission. Can the Honourable Deputy Minister confirm that, apart from the ministry, was the procedure followed to refer this matter to the Timbalan Pendakwa Raya? That is a robust procedure, as stated by the Attorney General himself in the Teoh Beng Hock case.

So, for this case, was the Timbalan Pendakwa Raya or the Deputy Public Prosecutor (DPP) ever referred this case, and what was said by

the information given by Pannir on the 27th? And whether the TPR ever made an NFA decision — I want confirmation from the Honourable Deputy Minister, was there ever an NFA decision by the Timbalan Pendakwa Raya on the information given by Pannir in this case on 27 September 2025? We just want confirmation whether there is such NFA from the DPP? Thank you, with permission, thank you.

Mr Speaker, whatever it is, we follow very careful rules and procedures. And regarding what the Honourable Member raised earlier, we did not refer it to the TPR. Referral to the TPR is only made after an investigation paper is opened and there are arrests and seizures made. That is the only statement I can give.

Dia memberi pengesahan. That’s all. Just yes or no. Adakah TPR pernah NFA? It is a simple question. No, but siasatan pada 27 September 25, has the TPR NFA it? That’s all.

Yes or no? Senang soalannya. Sekiranya tidak, boleh bagi tahu. Itu adalah siasatan — tahap siasatan.

Mr Speaker, I must answer this carefully because this case is very — we all know its position. I want to say that no Investigation Paper was opened. Thank you.

Jelas, ya?

Yeah, I think — so, that means that no investigation was carried out by the Ministry of Home Affairs and no investigation was ever referred to the Timbalan Pendakwa Raya. So, what was the purpose of taking a statement from Pannir on 27 September 2025 if no investigation or Investigation Paper was opened by the ministry?

What is the purpose?

Datuk Mr Speaker, I have already said earlier that the ministry carried out further investigation and found that no operational value was produced. The investigation was carried out three times, and based on the intelligence gathering that was carried out, the ministry found there is no room to continue the investigation. This is the official statement I wish to state, and there is no other statement.

Thank you.

I think what was said is clear enough. Perhaps there is no room, perhaps it can be — in other words, perhaps there is no evidence. I don't understand. Perhaps the Deputy Minister can explain?

Sorry, Madam. The question is from me.

Berkenaan dengan...

No. From the Deputy Minister, right? It means there is no room to bring it forward.

Sorry. I'm sorry, I didn't get that. Sorry, Madam. What, what was the question just now?

What I mean is, I understand that the Deputy Minister has given an answer.

Yes.

And in fact, when there is no room to bring it up, that means that is why the Investigation Paper was not pursued.

Alright.

That is my understanding.

Ya.

So, kalau ada tambahan?

I have a little addition. Thank you.

Okay. Give them a moment.

Sure.

[The Deputy Minister confers with officials]

Good, I have a further question.

Datuk Mr Speaker, I want to say earlier that...

He wants to answer that one first, okay.

Let the Minister answer that one.

Boleh.

We did carry out the investigation. With the police opening an operations file. So, there is no evidence showing that further investigation was carried out. I think my explanation has been clear and that statement.

There is no room because there is no evidence.

That is the understanding, yes.

Yes. So, so it's alright. I just want to know, can the Honourable Member confirm that the Investigation Paper was not opened by the police following the investigation taken, namely the interview with Pannir on 27 September 2025, and therefore, therefore the Investigation Paper was never referred to the Timbalan Pendakwa Raya? That's all.

I have no other statement. My statement is based only on what I have said earlier.

No, no. No need to be defensive. Saya just nak tanya soalan, yes or no. So, tidaklah?

That is the statement earlier.

My statement earlier is in accordance with what I have already said.

So, can I take it that no investigation — the Investigation Paper was indeed not opened in connection with the statement taken from Pannir on 27 September 2025?

Perhaps the Deputy Minister...

No IP was open, wasn’t it?

Datuk Mr Speaker, I do not wish to answer more than that.

Perhaps the Deputy Minister can, can tighten it up a little.

I have not changed what I said. My statement is based on what I said earlier.

So there was no, no NFA ever made by the Timbalan Pendakwa Raya? Is that [Inaudible] conclusion, right?

I have no other answer beyond this.

Okay. I. The Honourable Member for Tasek Gelugor, the Deputy Minister has already answered. I think what was given as the answer is, in fact, the process or the information that is in his hands.

Baik.

So, I think that's all.

Terima kasih.

Agreed. Honourable Members, the negotiation of the motion under Standing Order 18(1) has now concluded. Accordingly, I hereby end, I end the Special Chamber session for today. The Special Chamber today is adjourned until Wednesday, 8 October 2025, at 2.30 p.m.

[The Special Chamber adjourned at 3.54 p.m.]