Dewan Rakyat · 12 November 2025
15th Parliament, session 4, meeting 3 · not final · 664 turns · 57,399 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair]
Oral QuestionsQuestions
I invite Datuk Seri Utama Ir. Hasni bin Mohammad, Simpang Renggam.
Thank you, Madam Speaker. Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera. My first question.
1. Datuk Seri Utama Ir. Hasni bin Mohammad [Simpang Renggam] asks the Minister of Communications to state the measures that will be and are about to be taken to protect the image of the government, which is said to be unable to control the media from denigrating leaders and the government.
Please, the Honourable Minister of Communications.
Thank you, Madam Speaker. Thank you, Datuk, who–– YB, the Honourable Member. Before I begin my answer, allow me to take a little time to record my condolences to the family of the late Tan Sri Tiong Hiew King on his recent passing. The late was honorary chairman of Media Chinese International Limited. Under his leadership, Media Chinese grew into one of the most influential media groups in the region, with major publications such as Sin Chew Daily, China Press, Nanyang Siang Pau and Asia Weekly– Yazhou Zhoukan, which reach millions of readers in various countries.
The late's contribution to advancing the media sector and strengthening the local economy was immense and will continue to be remembered as a valuable legacy. May the family of the late and also the media colleagues under Media Chinese International Limited be given strength and fortitude in facing this time of loss. Madam Speaker, the MADANI Government always respects the principle of media freedom as one of the important pillars of the democratic system of the country. However, this freedom must be exercised with full responsibility and based on professional journalistic ethics. The media plays a role not only in ensuring the transparency and accountability of the government, but also in ensuring that information conveyed to the people is accurate, balanced and not misleading. Therefore, the Malaysian Media Council (MMM) was established through the Akta Majlis Media Malaysia 2025 [Akta 868], which functions to ensure that ethical, responsible and professional journalistic standards are adopted by media practitioners in Malaysia. The Malaysian Media Council was officially established this year once Akta 868 came into force on 14 June this year, and it held its first annual general meeting on 7 November. We congratulate the Council Members of MMM who were appointed through a voting process by MMM members, comprising local media industry players, with the impressive achievement that 50 per cent of the appointed members are women. Through the AGM, a code of conduct and a complaints mechanism were also approved with amendments, marking an important step towards building a media ecosystem that is stronger, ethical, professional and trusted by the people. MMM has three main categories, namely media companies, which include organisations, followed by media practitioners and independent media practitioners, and also members of the public, including non-governmental bodies, in category C. MMM, which upholds the principle of of the media, by the media, for the media, with permission, not only plays a role as an overseer of journalistic ethics but also provides a mechanism for resolving complaints of dissatisfaction against the media, which protects the public in order to build a responsible media ecosystem. The disciplinary action mechanism under Akta 868 has been established to enable the Council to take action against its members who are found to have breached any provision under this Act as stipulated
in the code of conduct, guidelines, directives and circulars issued by the council or board, as applicable. That concludes my answer. Thank you.
Simpang Renggam.
Thank you, Madam Speaker. Congratulations to the ministry on the measures and efforts taken, especially the mechanisms used to ensure that the media plays a role in determining harmony and stability, and in particular the sincerity of every government policy. However, does the Honourable Member agree that the ministry also needs to strengthen its efforts on public engagement, public engagement, with–– even though there are good mechanisms, even though there are good policies, but if there is no public engagement, then it will raise various questions in the media, particularly regarding the image of our leaders and country. Thank you.
Thank you, Madam Speaker. Thank you, the Honourable Member, for the supplementary question. Indeed, I feel this is part of the ministry's efforts, in line with my colleagues who are in the government, to constantly clarify the stance and also the policies and initiatives of the government to the people of Malaysia. So, as an example, under the Department of Information (JAPEN), we have JAPEN Digital, the JAPEN Digital initiative, where JAPEN consistently and strategically disseminates detailed information on the government's initiatives and achievements, as well as facts that refute any false information or slander. Apart from that, to help people know or distinguish which information is reliable, or which news they want to check whether the news is true or not, the ministry through the Malaysian Communications and Multimedia Commission (MCMC) has also established the AIFA, the Artificial Intelligence Fact-check Assistant, where people, members of the public, can use WhatsApp to check a news item, whether the information is accurate or not.
Since it was officially launched on 28 January until 31 October, AIFA has received an average of 760 messages a day. So, this shows that more
Malaysians are aware of the existence of AIFA, and I also hope that AIFA can be an effective tool to help the people of Malaysia distinguish fake news from true news. That concludes my answer. Thank you.
Pasir Mas.
Pasir Mas.
Thank you, Madam Speaker. Deputy Minister, on 28 February the Deputy Minister issued a statement, reported in Bernama, that the ministry takes the existence of fake accounts seriously. In my view, this is a good statement for us to deal with the existence of fake accounts. However, I would like to raise a report by MalaysiaKini on 30 September 2025, namely that there was an investigation which revealed a network of 263 cyber troopers boosting support for the Prime Minister on the internet, on Facebook, and these accounts— this investigation revealed that these 263 accounts have repeated or made the same comments in order to spread a false positive perception of the Prime Minister. It was repeated not only by opposition politicians but also by the government itself, which cited this as proof that the PM has been praised by fake accounts. For example, on 4 October 2025...
Ringkaskan soalan.
The Member of Parliament for Pandan said it is evidence of the existence of a PKR branch in Vietnam. Deputy Minister...
Ringkaskan soalan.
Deputy Minister, I am aware that the Minister has made a denial, but two weeks ago MalaysiaKini posted a video that proves or repeats these accusations. So, my question is why the government has not summoned MalaysiaKini to give an explanation on this matter, because I am confident this is not true. Surely the Prime Minister is not so desperate as to use fake accounts to praise himself. So,
I think MalaysiaKini should be taken action against, because it is spreading matters that cause the Prime Minister's image to suffer. Thank you.
Thank you, Madam Speaker. Thank you, the Honourable Member. If the government takes action by summoning MalaysiaKini to record a statement, I believe the other side will also stand up and accuse the government of not respecting media freedom. This is the difference between this government and that side. First, Meta has issued a statement stating that there were no abnormal activities. That is the explanation from Meta. If there are fake accounts, I do not deny it. I have always said there are indeed many fake accounts that have been created to promote scams. A report from Reuters also confirmed that in fact Meta, in 2024, 10 per cent of its profit or income came from advertisement fees paid by those scammers. So, there is indeed an issue of fake accounts. But in this case, Meta has also issued a statement saying there were no abnormal activities. So, I think we need to accept that statement. I think the stance of the MADANI Government, which is always repeated by PMX, is that we respect media freedom. So, although there are articles whose content we do not agree with, we are less in agreement, we state our stance, and it does not mean that every time we must summon them to record a statement. I think that is the biggest difference between the MADANI Government and them.
I invite Dato' Wira Dr. Ku Abd Rahman bin Ku Ismail, Kubang Pasu.
Mr Speaker, please answer question number 2.
2. Dato' Wira Dr. Ku Abd Rahman bin Ku Ismail [Kubang Pasu] asks
(a) how long the period will be taken to develop the National Data Bank (Bank Data Kebangsaan) and when it will be fully operational; and (b) what protocols are being taken to ensure data quality, security, privacy and interoperability.
Thank you, Deputy Speaker. Thank you, my friend from Kubang Pasu. Sir
Speaker, the development of the National Data Bank, the National Data Repository (NDR), is an important strategic step initiated under the MADANI Government's agenda to strengthen good governance, good governance, and drive Malaysia towards becoming an artificial intelligence (AI) nation, or AI Nation, by 2030. This National Data Bank initiative, which was supported under the Thirteenth Malaysia Plan (RMK13) on 31 July 2025, is one of the important projects in the effort to make government services more modern and data-based, in line with the provisions of the Thirteenth Malaysia Plan. The Ministry of Digital (KD) has been given the main responsibility for implementing this initiative. The main purpose of the National Data Bank is to collect and store various high-quality data assets from all ministries and government sectors. With this data centre, the government can use information more efficiently to make decisions, plan policies and improve the quality of services to the people. For now, Honourable Member, the Ministry of Digital is drafting the implementation plan for this NDR, which is scheduled to begin in 2026, and among the main matters to be carried out are: (i) conducting a comprehensive study on the current situation and data ecosystem needs of our country; (ii) establishing data governance policies and guidelines at the national level later; (iii) developing data standards so that all government agencies use the same data format; and (iv) assessing the infrastructure capacity and workforce skills related to data, as well as designing the architecture and technology platform to be used for the NDR later. This approach will help ensure that all government systems can share data more securely and effectively, and increase public confidence in the way government information is managed. Also, the MyGOV Malaysia application, Honourable Member, is the government's main initiative to modernise services and provide them on a data basis with smooth access to digital services. This requires the National Data Bank (NDR) to function as a repository of high-quality national data across various sectors. RMK13 is important because it enables MyGOV
to display data and information from various agencies on one platform, proactively check eligibility, and simplify and also speed up the application process for assistance for the people. To ensure that integration between MyGOV and NDR is safe and effective, several key protocols must be enforced, including the use of data verified from trusted sources, the implementation of explicit consent and also user accountability, both of which will help ensure that all government systems can share data more securely and effectively, and increase public confidence in the way government information is managed. Thank you, Honourable Member.
Kubang Pasu.
Supplementary question, Mr Speaker. What benefits will the people receive directly and indirectly through the implementation of this NDR, particularly in terms of increasing the efficiency of government services, provide greater delivery of assistance, and encouraging innovation and the digital economy. Next, regarding digital twin technology. A technology that allows operators to use real-time data and simulation to improve process efficiency, reduce energy use and lower operating costs. For example, the water industry. It is able to address pipe leakage issues. The question is regarding this digital twin initiative, are there any pilot projects that have been implemented and, if so, I ask the Minister to share with this House the results achieved. How is collaboration between agencies or organisations coordinated for the use of this technology? Thank you, Mr Speaker.
Thank you, Kubang Pasu, although the question is very long. Through the implementation of the National Data Repository (NDR), data from various ministries and government agencies will be consolidated under one integrated platform to improve the effectiveness of government services, and this initiative will directly and indirectly benefit the people through several key aspects.
(i) faster and more efficient digital services without repeating information by users;
(ii) more targeted government assistance based on accurate, up-to-date data, enabling the government to ensure that the actual recipients receive assistance, and thereby reducing leakage and also duplication of assistance, yes; (iii) opportunities for innovation and digital economic development through the provision of open data to the private sector and entrepreneurs; and (iv) support for the development of local artificial intelligence (AI), also Dato' Yang di-Pertua, through access to comprehensive and high-quality data and big data-based academic research facilities to strengthen the country's public policy. That concludes my answer, thank you.
Betong.
Thank you, Madam Speaker.
Digit, can you give the answer?
Yang Berhormat.
Digital twin technology.
For a written answer.
I will give a written answer.
Thank you, Madam Speaker. If the government intends to proceed with what, the proposal to develop the National Data Bank, Betong would like to ask the Minister whether the government will spend a large allocation to take into account infrastructure needs and other technical requirements for us to ensure data security. I seek clarification from the Minister. Thank you.
Thank you, Betong. To develop the National Data Bank, we certainly need an adequate allocation to take into account all requirements from the aspect of providing data centre infrastructure, storage to store
data, security infrastructure to protect data security, and other related requirements. However, the government will carefully study these aspects, whether it can use existing infrastructure experts such as the Public Sector Data Centre (PDSA) and the Government Integrated Telecommunications Network system or in short MyGoV\Net, and the Government Public Key Infrastructure service security system, and also the Malaysia Government Central Data Exchange, the secure data sharing platform, for cross-agency data sharing, Honourable Member. And also, apart from that, the aspect of data security control is also taken into account in line with the Data Sharing Act 2025 [Act 864], such as access control and also to the data that— and the parties involved in our data sharing. Thank you.
I invite Tuan Chong Chieng Jen, Stampin.
Thank you, Madam Speaker. My question, question 3.
3. Tuan Chong Chieng Jen [Stampin] asks the Minister of Finance to state whether diesel sales have decreased in Peninsular Malaysia, and what savings have been achieved by the government as a result of the diesel subsidy rationalisation implemented by the Government since June 2024.
Please, the Deputy Minister.
Thank you, Madam Speaker. Thank you to the Honourable Member. For the information of the Honourable Member, since the government implemented the targeted re-subsidisation of diesel under the BUDI MySubsidi Diesel programme, which began on 10 June 2024, the government has obtained savings of more than RM400 million a month, with annual savings of around RM5 billion. The savings obtained enable the government to redirect allocations to finance development projects and strengthen the people's social safety net through cash assistance programmes such as Sumbangan Tunai Rahmah and Sumbangan Asas Rumah. Under Budget 2025, the government increased the allocation for STR and SARA to RM13 billion, compared to RM10 billion in the previous year. This
It was subsequently increased to RM15 billion through the Penghargaan SARA programme. The Government also introduced the BUDI MADANI Individu and BUDI MADANI Agri-Komoditi programmes, which provide cash assistance of RM200 a month or RM2,400 a year to individuals who own private diesel vehicles. Farmers and smallholders are subject to the eligibility criteria that have been set. Up to 31 October 2025, a total of 320,000 private diesel vehicle owners among farmers, livestock breeders and smallholders have benefited, with payments totalling RM850 million. Meanwhile, for the land cargo transport vehicle segment under the BUDI MADANI Diesel programme, up to 30 September 2025, a total of 121,618 cargo vehicle companies with 355,074 vehicles have been approved to use fleet cards. This measure can ensure that the operating costs of the logistics sector do not rise sharply and that essential goods remain at affordable prices. In conclusion, under the Ekonomi MADANI framework, the implementation of targeted subsidies for fuel has shown effectiveness in reducing leakage, optimising fiscal expenditure and, at the same time, ensuring that eligible groups continue to receive the benefits. That concludes my reply. Thank you.
Stampin.
Thank you, Madam Speaker, and thank you, Honourable Deputy Minister. I feel that part of my original question was not answered, namely whether diesel sales have decreased in Peninsular Malaysia after the implementation of the diesel subsidy rationalisation. What I meant is that after the implementation of the subsidy rationalisation, we know― before, before that implementation, we know that subsidised diesel, which is cheaper than the market price, was widely smuggled and sold to foreign countries at higher market prices. Therefore, I feel that after we equalise the price of diesel with the market price, I think the smuggling of diesel will stop because there is no longer any price difference and no longer any profit, any gain, for the smugglers. So, I would like to know whether there is a decrease― is there a decrease in diesel sales after the implementation of the diesel subsidy rationalisation? And, if there is, what is the size of the decrease in diesel sales? Thank you.
Thank you, Madam Speaker. The targeting of the diesel subsidy was implemented on 10 June last year, whereby the pump price was raised
from RM2.15 per litre to RM3.35 per litre, which is the price without subsidy. Before the subsidy targeting, the average sales of subsidised diesel between January and May 2024 were around 770 litres a month. After the subsidy targeting, the average sales of subsidised diesel between June and December 2024 were around 465 million litres a month. So, there is a difference if we compare five months with five months. The reduction in subsidised diesel sales indicates that the reduction in leakage of the diesel subsidy is expected, and part of that reduction is due to reduced smuggling activities. At the same time, commercial diesel sales have increased after the subsidy targeting. This means that previously there was purchasing of subsidised diesel from petrol stations, which may have been used for local commercial purposes, namely for machinery and electricity generators at construction sites or factories. That concludes my reply. Thank you.
Kulim, Kulim- Bandar Baharu.
Alright, thank you to Madam Speaker. For my supplementary question to question 3, which concerns this diesel rationalisation, namely how the Ministry intends to resolve the issue of diesel misuse, especially among fishermen, that is Zone B and Zone C, where Zone C2 no longer has any diesel subsidy. So, smuggling is happening from Zone B and also from Zone C to Zone C2. Okay. The next point is that there is also a concern because there are still eligible citizens who have been left out of receiving assistance due to registration constraints or incomplete data. Also, I ask the Minister of Finance to explain how the Government ensures that no group is left out from receiving the petrol subsidy benefits through the implementation of the BUDI MADANI programme, especially for rural people. I will take an example, namely...
Yang Berhormat.
Yes, the question is not finished yet. He cannot answer for a moment. For orang asli fishermen, most of whom do not have driving licences, when they want to use BUDI MADANI, they have to have a licence, but most of them do not have one. So, what is the method to help especially orang asli land fishermen in Malaysia? Alright, thank you.
Thank you, Madam Speaker. Thank you to the Honourable Member. For the information of the Honourable Member, for fishermen, they are still eligible to receive the diesel subsidy at the subsidised price. So, they are not subject to the BUDI commodity or BUDI individual programmes. As for fishermen, especially perhaps I― because the Honourable Member mentioned a lot about fishermen, perhaps I will give here one...
Honourable Member, I mean C2. There is no C2.
Honourable Member, you cannot ask like this.
Okay, never mind. If I cannot get the specific C2 matter, I will answer in writing. But, for fishermen as a whole, we have― those registered with the Malaysian Fisheries Development Authority (LKIM), about 18,000 fishermen, including land fishermen registered with the Malaysian Fisheries Department, have already been included and are able to qualify to receive BUDI95. Also, we have private boats. It is also opened to private boats registered with the Sarawak River Board, the Sabah Ports and Jetties Department too. All of them have qualified. We have made them eligible to receive BUDI95, which we launched in October. However, nevertheless, we remain open. If there are groups who feel they have been left out, they can raise this with us and we will go through all the steps, and if we find that they are indeed eligible and need to be given the subsidy, we will do so. That concludes my reply. Thank you.
I invite Dato' Seri Dr. Shahidan bin Kassim, Arau.
Mr Speaker, question number 4.
4. Dato' Seri Dr. Shahidan bin Kasim [Arau] asks the Minister of Education to state: (a) whether the selection of contractors by the Ministry will be carried out on a closed or open basis for the CCTV installation project in 200 fully residential schools; and (b) what is the best location for CCTV installation to prevent bullying incidents in hostels, if there is a risk of exposing students' shame.
Thank you, Madam Speaker. Thank you for the question from the Honourable Member for Arau. The Ministry of Education (KPM) has channelled an allocation of RM3 million for the purchase and installation of CCTV in 200 selected fully residential schools. The procurement process is carried out openly through the ePerolehan system, guided by Treasury Circular (PK) 2.1 – General Matters, which has already set the value limits and procurement procedures in force. Procurement has been carried out by the State Education Department, the District Education Office or the schools, depending on their respective situations. The supply and installation of CCTV is implemented strategically, involving synergy across ministries, KPM agencies and divisions under KPM, which covers advisory services and the determination of specifications from the JKR (Public Works Department) and the Office of the Chief Government Security Officer (CGSO). For the information of Honourable Members, KPM made an announcement regarding the installation of CCTV on 4 September 2025 as part of a phased strategy to strengthen supervision and prevent bullying and misconduct in schools. KPM did not wait long after the announcement and immediately began the procurement process, which subsequently led to the implementation of CCTV installation starting 13 October 2025. This action reflects KPM's high commitment to ensuring that the safety of students and school community is given priority. So far, a total of 149 out of 200 schools have completed CCTV installation, bringing the achievement to 75 per cent. In the context of determining CCTV installation locations, KPM places emphasis on balancing the safety of students and privacy, based on advisory services from the CGSO. Therefore, CCTV will be installed in strategic public areas such as the main hostel routes, including entrances and exits,
staircases and corridors, dining halls, prep rooms, ironing rooms, and the surroundings of remote hostel blocks. At the same time, KPM wishes to emphasise that CCTV will not be installed in bedrooms, toilets or changing areas because it may expose students' shame and violate the principles of human rights and privacy. As an additional measure, supervision in those areas will be strengthened through scheduled warden patrols. That concludes my reply. Thank you, Madam Speaker.
Arau.
Honourable Member, thank you for the answer. The question is what steps KPM will take to ensure that access to recordings and the privacy rights of students are protected. For example, who can access the recordings? For how long are the recordings stored? And is there consistent deletion or destruction? Finally, Honourable Member, this question has been asked but not answered. The Government has allocated more than RM9 million for badges. But for CCTV, only more than RM3 million. Does the Honourable Member think that more schools need CCTV and whether we should spend more? Because we can spend RM9 million on badges, why can we not spend a little more on CCTV, which is the root cause of the problems happening now?
Okay, thank you for the supplementary question from the Honourable Member for Arau. Thank you, Madam Speaker.
[Bangun]
Regarding the steps on how we protect the privacy of our children and how the access to recordings can be stored and also who can have access. For the information of Honourable Members, recordings such as those provided or CCTV recordings, we will store them with the existing specifications, able to store at least 30 days of recordings and also with the specifications that have been determined. And regarding the use and whether in terms of supply, installation or access and administration of the overall operation of this CCTV, all of them have been outlined in the guidelines that have been prepared by the Ministry of Education Malaysia, and the Ministry of Education Malaysia will certainly balance between the needs of the
aspect of security and, number two, in terms of protecting the privacy or shame of our students. It was mentioned earlier and compared with the allocation for CCTV and the allocation for distributing the Jalur Gemilang badges. I hope that no Honourable Member will question the KPM initiative to distribute Jalur Gemilang badges in April last year in order to foster the spirit of patriotism. I think that is a responsibility of us all. As I have emphasised many times, all these matters are not a zero-sum game. Doing one thing does not mean we do not do other things. Implementing one initiative with the existing allocation does not mean we neglect other allocations. And regarding the allocation for this CCTV, Honourable Member for Arau, the allocation of RM3 million has already been given for 200 schools, and perhaps the Honourable Member for Arau has overlooked that the Government has also announced an additional allocation of RM5 million to equip 333 other residential schools. And this effort will certainly continue for the welfare and interests of our children. Thank you, Madam Speaker.
Kota Melaka.
Thank you, Deputy Speaker. My question to the Deputy Minister is divided into two. The first is what procedure we have to ensure that this CCTV will always function. Because we often see that when an incident occurs, when we want to review the recordings, it is informed that the CCTV was not functioning. That is the first. Second, in the future, can the Ministry consider channelling the allocation directly to the schools, whether to the PIBG or the school board, for them to carry out the CCTV installation? Thank you, Deputy Speaker.
Thank you for the supplementary question from the Honourable Member for Kota Melaka. Number one, regarding how we ensure that the CCTV complies with requirements and always functions. That responsibility naturally rests with the respective school administrators to ensure that not only the CCTV but also other school assets are properly looked after, maintained and kept functioning.
For the information of the Honourable Member for Kota Melaka, each set of CCTV that we have specified, with its specifications, has a ceiling price of RM15,000. So, with RM3 million, we can install for 200 schools. And as for the procurement method, Madam Speaker, KPM channels the allocation either to the schools or to the JPN or PPD. For example, for SMKA schools, we did 32 schools, and the allocation was sent directly to the schools, and out of those 32 schools, 32 suppliers have been appointed. Schools have autonomy to appoint based on the existing procurement procedures. Similarly, if we give it to fully residential schools, the number is 28 schools, but at the same time 26 suppliers have been appointed by the schools. The repeat suppliers are only in Sarawak because of issues of location and logistics. But for the rest, they have autonomy to appoint based on the existing financial procedures. Thank you, Madam Speaker.
I invite Datuk Seri M. Saravanan, Tapah.
Thank you, Madam Speaker, my question is number 5. Thank you.
5. Datuk Seri Saravanan a/l Murugan [Tapah] asks the Minister of Human Resources to state the latest developments regarding the proposed Non-Workplace Accident Scheme (SKBBK) by the Social Security Organisation (PERKESO).
Thank you, Madam Speaker, thank you, my friend from Tapah. For the information of this august House, the Cabinet Memorandum relating to the Rang Undang-undang Keselamatan Sosial Pekerjaan (Pindaan) 2025, to provide protection to workers against accidents that occur outside working hours, was approved by the Cabinet at its meeting held on 10 October 2025. Accordingly, the Honourable Minister of Human Resources tabled the first reading of the Rang Undang-undang Keselamatan Sosial Pekerja (Pindaan) 2025 in the Dewan Rakyat on 30 October 2025. The second reading of this Bill will be made at this sitting. Thank you, Honourable Madam Speaker.
Tapah.
Thank you, Honourable Member. Mr Speaker, I would like to ask the Minister, what is the stance of trade unions on this proposal, given that only workers have to make contributions. Based on the study and reactions from various parties, we can see there is a mix reaction or mixed views. So, what is the stance of trade unions on this matter? Thank you.
Thank you, Honourable Member, Mr Speaker, thank you, my friend from Tapah. For the information, PERKESO has held several engagement sessions with stakeholders regarding the implementation of this matter, and generally KESUMA welcomes this intention to expand the protective security network as the Honourable Member has just presented, and the improvements can be debated and, God willing, will be debated within a not too long period before the second reading of the Bill. And KESUMA, through PERKESO, this engagement is actually carried out through several mediums, such as the medium of enterprise, the medium of the Malaysian Employers Federation, the Congress of Unions in the public service, namely CUEPACS, and the Federation of Malaysian Manufacturers or FMM. And this matter will also lead to the Social Security Bill that will introduce four aspects, namely: (i) introducing a non-occupational injury system; (ii) definition of non-occupational injury; (iii) contributions and implementation phases; and (iv) expansion of benefits. And I find that this matter, Honourable Member Mr Speaker, is very good and Members of the House should fully support the second reading later. Thank you, Honourable Member Tapah.
Setiu.
Thank you, Mr Speaker. My question is, 80 per cent of contributors under the Employment Injury Scheme have their claims rejected because they are not included in the definition of employment injury. My question is, will the SKBBK proposed later involve any additional contributions by employers and members? What are the financial implications
that the Government will bear to implement this scheme? And can this scheme also be joined by contributors who contribute under the SPPS Scheme, the Self-Employment Protection Scheme? That concludes my question. Thank you.
Thank you, Mr Speaker, thank you Honourable Member. And for that reason I say that this Bill for the second reading will be tabled under that Act. The rate of employment alone, which involves 7.63 million contributors, and I say this based on the statistics I have, shows the additional participation arising from the increase according to those salary rates. And contributions, for example the employee's share contribution for SKBBK, will be raised in stages, namely 0.75 per cent, and for the first and second years one per cent, and for the third, fourth and fifth years, 1.25 per cent. For the sixth year onwards, with a maximum salary ceiling of RM6,000. So, this is what I say for this second reading, which has received the attention of the Honourable Members, and which we will be able to discuss in this august House shortly. Thank you, Honourable Member.
I invite Tuan Mordi Bimol, Mas Gading.
Thank you, Madam Speaker, Mas Gading's question number 6.
6. Tuan Mordi anak Bimol [Mas Gading] asks the Minister of Communications to state: (a) the statistics on cases of theft and vandalism of telecommunications towers since 2024 in Sarawak and especially in Mas Gading, including losses and enforcement actions; and (b) the steps to ensure that new towers and the JENDELA Phase 2 upgrades are equipped with comprehensive security features from the outset of construction.
Thank you, Madam Speaker, thank you Honourable Members. Madam Speaker, the Ministry of Communications and also the Malaysian Communications and Multimedia Commission (MCMC) work together to provide services, and constantly collaborate with enforcement agencies and local residents in order to
reduce the risk of theft and also vandalism of communications towers, and take steps to raise public awareness of cases and issues of theft and vandalism at tower sites. For 2024, Sarawak recorded a total of three theft cases and also 1,116 vandalism cases, with the estimated total losses of RM9.315 million. As for the Mas Gading Parliamentary constituency, a total of three theft cases and also 24 vandalism cases were recorded, with total losses of around RM10,463.60. Meanwhile, for this year up to the second quarter, Sarawak recorded 33 theft cases and also 334 vandalism cases, involving losses amounting to RM3.481 million. In the Mas Gading Parliamentary constituency, there were four theft cases and 10 vandalism cases, with total losses recorded at RM74,341.14. To improve the security of towers under the initiative of the National Digital Connectivity Plan (JENDELA), service providers have taken the empowering step of, with permission, hardening high-risk tower sites by installing anti-theft and anti-vandalism equipment such as the installation of conduits, trunking (with permission), steel, to prevent copper cables from being cut and stolen. In addition, the installation of additional security fences and locks in the cabinets housing electronic equipment and batteries has also been implemented to protect these assets from being damaged or stolen by irresponsible parties. For high-risk areas, the installation of closed-circuit television (CCTV) cameras and alarm systems has also been implemented to help reduce the risk of theft and vandalism cases. In addition, the equipment at communications tower sites is also equipped with detection devices and sensors, with permission, which will send signals to the service provider should there be an intrusion or damage to the transmission system at the communications tower site.
MCMC and industry players are also drawing up work plans to carry out integrated operations together with the Royal Malaysia Police (PDRM) through visits to business premises or groups of scrap goods that are potential disposal points for items such as cables, copper and also batteries and electronic equipment. That is all, thank you.
Mas Gading.
Thank you, Madam Speaker. Thank you, the Honourable Deputy Minister. The issue of cable theft and vandalism at telecommunications towers is not a new matter and this problem is getting worse, and in my area there have been cases where it took up to three days to restore service after cable theft occurred. Therefore, I would like to ask the ministry whether it has a rapid intervention plan or rapid response mechanism to enable coverage within less than 24 hours in rural areas, and what steps the ministry has taken to further strengthen cooperation with other agencies such as the Ministry of Domestic Trade and Cost of Living (KPDN) and the Royal Malaysia Police (PDRM) to control the sale of stolen cables to scrap metal dealers, as well as to introduce an early reporting mechanism when suspicious stolen materials are detected. That is all, thank you.
Thank you, Madam Speaker. Thank you, Honourable Members. Firstly, if we look at the recorded cases and the losses that have been incurred, we actually see a decline not only for the state of Sarawak but also for the whole country. For 2024 throughout the year, the losses caused by theft and also vandalism amounted to RM49.1 million, but for this year up to June, the losses recorded are RM30 million. To address the issue, because after theft or vandalism, we need time to repair all these tower sites, they are actually connected to the Network Monitoring Centre. So, for any network down, the telco company will know about the case immediately. But the time needed to restore or repair depends on several factors such as the distance from the site team and where the team is located. It may take a longer time especially for interior areas. Usually, realistically, service disruption can last for four hours up to eight hours. So, for the cases mentioned by the Honourable Member, some suggestions or initiatives that are being implemented by MCMC are on how we can improve the backhaul network or link redundancy. For this, we need to cooperate with Sankofa so that we do not have a single point of failure. If we have a better fibre optic network, then we do not have—
we improve our link redundancy, so we can avoid a single point of failure, so— especially for residents in interior areas. They will not face a service outage for as long as three days, and the ministry will always work together with the PDRM to carry out Ops Lusuh now, after we made amendments to the Communications and Multimedia Act. The penalties have actually been increased for thieves and for those who deliberately commit vandalism. That is all, thank you.
I invite Dr. Siti Mastura binti Muhammad, Kepala Batas.
Thank you, Madam Speaker, my question number 7.
7. Dr. Siti Mastura binti Muhammad [Kepala Batas] asks the Minister of Entrepreneur Development and Cooperatives to state the ministry's strategy in helping Bumiputera citrus fruit entrepreneurs to improve competitiveness, including halal certification, quality standards, and access to domestic and export markets.
Madam Speaker, for the information of the Honourable Members, the Ministry of Entrepreneur Development and Cooperatives is always committed to strengthening the competitiveness of micro, small and medium enterprises (PMKS), including entrepreneurs who run citrus fruit pickling businesses, with permission, pickle— not pickleball, yes, Mr Speaker. Among the entrepreneurship initiatives and programmes provided to PMKS entrepreneurs, including Bumiputera citrus fruit entrepreneurs, covering halal certification, quality standards, and access to domestic and export markets, are as follows. The Bumiputera Enterprise Enhancement Programme (BEEP) by SME Corp aims to improve productivity, monitor certification, and implement promotion and advertising activities. As of 31 October 2025, one PMKS company engaged in citrus business has been approved a grant worth RM500,000 for the purchase of machinery and equipment. The Halal Entrepreneurship Development Programme (PPKH) by KUSKOP aims to develop entrepreneurs in the halal sector by focusing on three main elements, namely certification and standards, marketing and promotion, and financial support and technical guidance. It includes the development programme
of halal industry capacity to enhance the capabilities of entrepreneurs and cooperatives in producing competitive halal products and services. In addition, under the PPKH programme, the Halal Product Capacity Development Programme (PPKPH) is also provided, aimed at strengthening the capacity of halal products in terms of branding, packaging and also labelling. In addition, the Halal Entrepreneur Internationalisation Programme (PPUH) has also been implemented to expand and strengthen Malaysia's halal brand in international markets. The financing schemes provided by financing agencies under KUSKOP include, among others, TEKUN Nasional Berhad, SME Bank, Amanah Ikhtiar Malaysia (AIM) and Bank Rakyat, to help entrepreneurs increase working capital, including the purchase of stock, machinery and packaging equipment. For the state of Penang, in 2024, one Bumiputera citrus fruit entrepreneur received financing of RM700,000 from SME Bank, and six Bumiputera citrus fruit entrepreneurs received financing of RM173,000 from TEKUN Nasional in 2025. And finally, the One District One Industry Programme (SDSI) implemented by KUSKOP through the National Entrepreneur Institute (INSKEN) is an economic development initiative that highlights the uniqueness of local products based on district identity and the efforts of the local community. This programme is a collaboration with the state government and is implemented comprehensively, covering the process of selecting potential industries, capacity development, branding, packaging and also certification, and marketing. That is all, thank you.
Kepala Batas.
Thank you to the Deputy Minister for the comprehensive reply. If people come to Penang and do not eat citrus pickles, it means it is indeed not an unimportant matter. So, when coming to Penang, besides pasembor, one must get Jeruk Pak Ali in particular. So, to the Deputy Minister, in response to the reply given, is the ministry planning to review policies or measures to support young entrepreneurs, especially to venture more widely into the local citrus fruit industry, considering that Malaysia is the Chair of ASEAN? And can the ministry help local fruit growers to become quality suppliers in supporting the development of this citrus fruit industry?
Thank you for the supplementary question. We will indeed help entrepreneurs. For example, the maximum grant provided through BEEP is up to RM500,000 as informed earlier. Of course, if we look at the micro enterprises eligible to apply under this BEEP programme, the process is easy. They must operate at a premises that is legally licensed, have annual sales of more than RM100,000, and if starting a business, the company must operate for at least six months and achieve annual sales of RM100,000. As for assistance packages, we do have assistance packages in terms of productivity, automation, online e-commerce applications, e-payment and also ICT applications. Improvement of product packaging, development of branding and promotion, Quality Management System (QMS) certification are also provided.
Product development and innovation, and also the ministry will help those who enter the citrus field to be listed on the Bursa Malaysia market. That is all, thank you.
Thank you, Madam Speaker. Honourable Deputy Minister, in 2025 a total of 17 million was allocated for the development of the halal industry and vendors under KUSKOP. However, I have checked and for 2026, this item no longer exists. This question of mine is not fair, Honourable Deputy Minister, why was this item removed from KUSKOP's expenditure? My question to the Honourable Deputy Minister is, has KUSKOP no longer been given a role in— in managing halal certification for entrepreneurs starting in 2026, especially Bumiputera entrepreneurs in rural areas? I think KUSKOP should also be given a role because it is close to the hearts of entrepreneurs. Thank you, Madam Speaker.
Tampin.
Thank you, my friend the Honourable Member for Tampin. Indeed, until 2017, we were given 17 million for programmes aimed at certification, packaging, capacity improvement and export productivity. But it is true, as was told to this august House, that for this year the 17 million was not provided because there is a programme and an effort to
pass the Halal Commission under HDC. HDC is the Halal Development Corporation. This programme will indeed be carried out, its purpose being to provide better productivity for certification. The ministry also has Bank Rakyat, AIM and TEKUN to assist in terms of the food industry, in the context of the food industry. Also to improve packaging, all agencies have been given RM30,000 for entrepreneurs involved in improving their packaging. Grants are also provided, assistance for each entrepreneur in 2025, 10,000. The ministry does wish to work together with these entrepreneurs, but perhaps because a Halal Commission will be established, the Halal Commission will take over all movements and assistance for certification. It is not only for citrus, but buah pala (nutmeg) has also been included. For example, with permission, Honourable Member, nutmeg. We have conducted a study, but its criteria were not approved, why? It did not meet the criteria provided. Wet citrus, nutmeg is indeed dry. Also under SDSI, the SDSI programme we have carried out. For example, in Penang, we have given assistance to Jeruk Pak Ali. Our aim is indeed to help entrepreneurs, but if there is a commission established to help everyone, a one-stop centre, I think that is indeed a good step. That is all, thank you.
I invite Puan Hajah Rodziah binti Ismail, Ampang.
Thank you, Speaker. Bismillahirrahmanirrahim. I request a reply from the Minister, question number 8.
8. Puan Hajah Rodziah binti Ismail [Ampang] asks the Minister of Finance to state any plans to outline a specific policy framework, laws, regulations and regulatory control for the tokenisation of assets and digital assets that adopt "Distributed Ledger Technology", especially "blockchain", as well as the current status and direction of the Central Bank Digital Currency (CBDC) agenda.
Please, the Deputy Minister of Finance.
Thank you, Madam Speaker. Before I begin, I would like to request one or two additional minutes to answer the question from the Honourable Member for Ampang.
Thank you. The Securities Commission Malaysia (SC) is using a two-pronged approach, or with permission, two-pronged approach, to develop the digital asset industry, namely providing responsible access to digital currencies such as crypto assets and digital tokens, such as utility tokens, and encouraging innovation in market models based on blockchain technology such as the tokenisation of bonds, funds and equities. Since 2019, the SC has set a clear definition of digital currencies and digital tokens as securities through the Capital Markets and Services Order— that is, in— (Specification of Securities) (Digital Currencies and Digital Tokens) 2019 or PO 2019, following the principle of same risk, same rules. This enables traditional capital market participants such as brokers and fund managers to access these new assets. To meet the need for a more specific regulatory framework to support new capital market activities relating to digital assets, the SC also introduced recognised guidelines in 2019, or with permission, Guidelines on Recognized Markets, and the Digital Asset Guidelines, Guidelines on Digital Assets, which cover the trading, custody and issuance of digital tokens. In line with regional digital asset developments, the SC issued a Public Consultation Paper in June 2025 on proposed amendments to the Digital Asset Exchange (DAX) guidelines, which aim to strengthen the local digital asset market through wider listing of assets and upgrading the requirements for operating DAX markets to ensure investor protection is assured. In 2025, the SC made amendments to PO 2019 to provide clarity that security tokens issued through blockchain technology are regulated as underlying securities. For example, a bond token is recognised as board and so on. Therefore, this amendment enables capital market participants to offer security tokens in accordance with the existing regulatory framework and main guidelines. As guidance to the industry on risk management inherent in capital market products and services using blockchain technology, the SC issued a Public Consultation Paper in May 2025 as a regulatory framework for asset tokenisation. In addition to enhancing the existing regulatory framework, the SC is also involved in pilot asset tokenisation projects such as token
Silakan.
Thank you. The Securities Commission Malaysia (SC) is adopting a two-pronged approach, with permission, to develop the digital asset industry, namely providing responsible access to digital currencies such as crypto assets and digital tokens, such as utility tokens, and encouraging innovation in blockchain-based market models such as the tokenisation of bonds, funds and equities. Since 2019, the SC has set a clear definition of digital currencies and digital tokens as securities through the Capital Markets and Services Order— that is, in— (Securities Designation) (Digital Currencies and Digital Tokens) 2019, or PO 2019, based on the principle of same risk, same rules. This enables traditional capital market participants such as brokers and fund managers to access these new assets. To meet the need for a more specific regulatory framework to support new capital market activities involving digital assets, the SC also introduced recognised guidelines in 2019, with permission, namely the Guidelines on Recognized Markets and the Garis Panduan Aset Digital, Guidelines on Digital Assets, which cover the trading, custody and issuance of digital tokens. In line with regional developments in digital assets, the SC issued a Public Consultation Paper in June 2025 on proposed amendments to the Digital Asset Exchange (DAX) guidelines, which aim to strengthen the local digital asset market through a wider listing of assets and upgrade the requirements for operating DAX markets to ensure investor protection is assured. In 2025, the SC made amendments to PO 2019 to clarify that security tokens issued through blockchain technology are regulated as underlying securities. For example, a bond token is recognised as board and so on. Therefore, these amendments enable capital market participants to offer security tokens in accordance with the existing regulatory framework and principal guidelines. As guidance to the industry on managing the risks inherent in capital market products and services using blockchain technology, the SC issued a Public Consultation Paper in May 2025 as a regulatory framework for asset tokenisation. In addition to improving the existing regulatory framework, the SC is also involved in pilot asset tokenisation projects such as token
bon, launching a regulatory sandbox for deeper innovation exploration and holding industry engagement sessions to enhance capabilities and understanding of blockchain technology. The rapidly developing and increasingly innovative digital asset landscape is prompting central banks around the world to assess the merits of issuing a Central Bank Digital Currency (CBDC). Bank Negara Malaysia is also actively assessing the potential of CBDC as well as distributed ledger technology (DLT), with permission, to support public policy objectives. In this effort, Bank Negara has implemented a proof of concept (POC), with permission, for domestic wholesale CBDC, sorry, wholesale domestic. It is expected to be completed by the end of this year. This step aims to assess the potential of CBDC in a controlled environment to strengthen the national cross-border wholesale payment system and to enhance the understanding and capabilities of Bank Negara and the relevant financial industry regarding the potential of DLT and CBDC. This is to ensure the country's level of readiness in supporting the potential issuance of CBDC in the future. Bank Negara is also actively involved in the cross-border wholesale CBDC innovation project operated by the Bank for International Settlements Innovation Hub, with permission, together with several other central banks. These include Project Dunbar, Project Mandala and Project Rialto, which explore the use of CBDC or multi-CBDC to facilitate cross-border wholesale payments more efficiently, quickly and securely. Thank you.
Ampang.
Thank you, Deputy Minister. A very good explanation on tokenisation, but let us look closely here. We are aware that this DTL or DLT, sorry, distributed ledger technology and blockchain are now transforming many landscapes: the financial landscape, investment, and also digital governance in this world. So, Ampang's concern is whether Malaysia will not be left behind. What is actually my supplementary question? Can the Deputy Minister answer and explain the findings? Earlier it was mentioned about the results of the proof of concept. What are its findings regarding the implementation of Central Bank Digital Currency, or CBDC, so far, and is there a timeline for the assessment of the next phase?
The next question: is Bank Negara Malaysia— the Deputy Minister answered earlier, that it is now focusing only on the implementation of wholesale CBDC for transactions between financial institutions, or might it also consider developing retail CBDC for public use? Because much was answered earlier regarding financial institutions.
So, if there is public use, this would be in line with the digitalisation transformation of the national financial system and the daily transaction needs of the people. Thank you.
Thank you, Madam Speaker. Thank you to the Honourable Member for Ampang. The use of blockchain technology has great potential to improve efficiency in the financial sector and the economy as a whole. Bank Negara is assessing the potential use of wholesale central bank digital currency, as it is called, wholesale central bank digital currency, with permission, in Malaysia. Bank Negara is exploring the use of domestic wholesale CBDC through a proof of concept together with selected domestic financial institutions, with the aim of improving and strengthening Malaysia's wholesale payment system, RENTAS. In exploring the potential of blockchain technology, Bank Negara adopts a responsible innovation approach in the financial sector in Malaysia. This approach aims to create an environment that supports the exploration of credible digital asset use cases by industry players, while ensuring that Bank Negara's primary mandate of financial and monetary stability remains preserved. Although tokenisation offers various benefits, the implementation of this innovation must also be accompanied by an appropriate risk management approach. Studies are continuing on the legal constraints related to the issuance of wholesale CBDC, in order to identify appropriate legal solutions to address these constraints. In addition, in efforts to assess the potential use of central bank digital currency in cross-border transactions, Bank Negara also monitors the developments of other projects by the Bank for International Settlements Innovation Hub that aim to improve cross-border payment systems. Also, Bank Negara together with the Securities Commission Malaysia (SC) will continue to support efforts to build the level of readiness, the level
towards the exploration and adoption of tokenisation technology in Malaysia's financial sector. Thank you.
Pendang.
Thank you. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace, Madam Speaker. Thank you. I would like to raise several questions regarding...
Just one question.
One question, yes. One question. So the question is this, it is related. In the government's effort to explore the implementation of asset tokenisation and central bank digital currency (CBDC), to what extent is the government prepared to formulate an integrated regulatory framework that involves not only Bank Negara Malaysia and the Securities Commission, but also includes the Cyber Security Agency and the National Financial Forensic Intelligence Unit? This is important to prevent the risks of market manipulation, money laundering and illegal capital outflows when digital assets and blockchain systems operate across borders without strong central control. What is the government's guarantee that the implementation of this CBDC will not open up space for interference by major powers or foreign digital surveillance of the financial data of Malaysians, especially when these digital transactions require interoperability with foreign digital currency systems such as the Digital Yuan or Fedcoin? Has the government assessed the dimensions of digital sovereignty and economic security in the direction of CBDC implementation, so that this financial innovation agenda does not turn into a new form of digital economic colonialism? Thank you.
Thank you, Madam Speaker. Thank you to the Honourable Member for Pendang, and we take note of the proposals mentioned by the Honourable Member for Pendang. The government acknowledges that tokenisation technology and the use of Distributed Ledger Technology (DLT) have high potential that can stimulate Malaysia's economic growth. Therefore, the government takes an open approach and supports this growth in a prudent and responsible manner. For several years now, to support the development of this sector, both regulators, namely the SC and Bank Negara Malaysia, have issued
regulations and guidelines in this regard. Any future framework will take into account the need to balance innovation with financial stability, investor protection and compliance with existing laws. As this sector is developing so rapidly, the SC and Bank Negara have each already issued their respective discussion papers to obtain views from all stakeholders. So, the government here will continue to work with all relevant parties, including regulators, industry, syariah advisory bodies, and perhaps in terms of cyber, to ensure alignment with national priorities and international standards. Thank you.
I invite Dato' Sri Dr. Haji Ismail bin Abd Muttalib, Maran.
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, allow me to welcome the teachers and students from Presint 5, Putrajaya. [Applause] Datuk Mr Speaker, toman fish, anchovies; patin fish, tenggalan fish; Honourable Member Rahman from Lipis, Maran's Question number nine.
9. Dato' Sri Dr. Haji Ismail bin Haji Abd. Muttalib [Maran] asks the Minister of Human Resources to state why TVET and the living allowance under the Skills Development Fund Corporation (PTPK) have been discontinued for several years, which has caused stress for students from low-income households (B40).
Thank you, Honourable Member, Mr Speaker. Thank you, Honourable Member for Maran. I am not good at answering pantun. Honourable Mr Speaker, the Ministry of Human Resources (KESUMA) is always committed to ensuring that Malaysians, including young people, have access to relevant, inclusive skills training that is aligned with current job market needs. In this regard, the Skills Development Fund Corporation (PTPK) is tasked with producing new talent and attracting young people to join the TVET stream through skills training financing. The financing focus for 2025 has been directed towards skills programmes, especially for sectors and industries that are, with permission, high-growth high-value
as well as priority areas in the New Industrial Master Plan 2030, such as maintenance, repair and overhaul of electric vehicles, aerospace, and artificial intelligence (AI). For the information of this august House, as of August 2025, PTPK has approved loans and has active financing commitments amounting to RM524 million, involving 52,098 students and 306 training centres. Of this total, 21,947 students had their loans approved in 2025. All students whose loans have been approved continue to receive financing and living allowances as usual. In fact, the living allowance has now been increased from RM400 to RM800 for each student. The claim that PTPK has on several occasions discontinued loan financing and monthly living allowances is completely baseless. In fact, not a single student whose loan has been approved has had their financing stopped. PTPK issued a media statement on 11 September 2025 to refute the allegations. For future planning, the distribution of PTPK funds will be based on the following priorities: (i) high-impact programmes; (ii) loan repayment performance record; (iii) compliance with application conditions, including appeals; and (iv) job placement after completion of training. Based on the new approach of performance-based budgeting and the principle of value for money, PTPK is confident that the effectiveness and sustainability of the funds will continue to be assured, thereby ensuring students follow higher-quality courses, obtain better qualifications, and have a more secure future. PTPK always ensures that every programme implemented is truly high quality and relevant to current needs. Thank you, Honourable Mr Speaker.
Maran.
Thank you, Mr Speaker. Thank you, Deputy Minister. I would like to know, for each Skills Development Fund that has been established, how many students have we given loans to and provided training for? And how much allocation has been released for this purpose? And have all the students who received these loans obtained employment? And does the government or ministry
intend to consider the involvement of the private sector or industry in sponsoring, co-sponsoring students who receive assistance from PTPK? Thank you very much.
Thank you, Honourable Mr Speaker. The matter raised by the Honourable Member for Maran just now has in fact already been answered, and of that total, in this year alone, out of 306 centres, 21,948 students have had their loans approved. What remains is the matter— and we have now increased the allowance from RM400— to RM400.
And, the last question raised by Maran, is there cooperation with the private sector? That is certain. Cooperation with the private sector, provided the conditions we mentioned just now are met, namely the four matters that must be complied with, which I mentioned earlier, and of course today we want to keep up with current developments. The current developments, as I said earlier, are based on performance-based budgeting and the principle of value for money. That means the involvement of these private colleges must follow developments, such as the courses available today that can have a major impact on the country itself. We do not want to keep disbursing such large amounts, exceeding RM500 million, without a major impact. And in terms of employment, that is what we state so that this major impact can lead to employment opportunities. But as for our ADTEC, almost 100 per cent of students get jobs, almost 100 per cent; those who do not get jobs are because they choose not to take up jobs. Thank you, Honourable Mr Speaker.
Batu Pahat.
Thank you, Dato' Mr Speaker. My supplementary question to the Deputy Minister is, given that there are various TVET schemes under various ministries, including in KESUMA and other agencies, will KESUMA realign the financing system for TVET trainees so that there is no duplication, including between public and private institutions, so that all these allowance rates are uniform and fair? Thank you.
Thank you, Honourable Mr Speaker. The matter raised by the Honourable Member for Batu Pahat just now will certainly be done in terms of uniformity as an example, and therefore, we also
look at current needs. That is why I said earlier that we have increased the allowance from 400 to 800 so that we look at current circumstances that can lead to their financing in line with the cost of living and so on, and we will certainly study these matters. But in terms of public universities, that falls under the financing of the Ministry of Higher Education. The study is carried out by the Ministry of Higher Education, and we are carrying out studies in terms of financing through private colleges. And for these private colleges as well, as I said earlier, the high-impact effects are what we need to study, because we do not want them to leave with, for example, a certificate and then find it difficult to get employment opportunities. This is exactly what we are studying very carefully so that this very significant impact can lead to their effectiveness. And, we know that the ministry, through MTVET, is aligning the entire TVET system, and the establishment of a TVET commission has been carried out so that in the future it will no longer keep changing constantly. Thank you, Honourable Mr Speaker.
I invite Tuan Sivakumar Varatharaju Naidu, Batu Gajah.
My question number 10.
10. Tuan Sivakumar a/l Varatharaju Naidu [Batu Gajah] asks the Minister of Education to state the comprehensive policy of the ministry to ensure the sustainability of Tamil education in Malaysia, including a long-term plan to improve infrastructure, strengthen the curriculum and reinforce the position of vernacular schools within the framework of the Constitution and national education aspirations.
Thank you, Madam Speaker. Thank you for the question from the Honourable Member for Batu Gajah. The Ministry of Education is always committed to ensuring the sustainability of multi-stream education, including Tamil education in Tamil National-Type Schools (SJKT), in line with the Federal Constitution, the Education Act 1996 and also the aspirations of the Malaysia Education Development Plan. This approach is based on the principles of inclusiveness, equity and quality so that all pupils – every pupil receives an equal educational opportunity regardless of background. The position of SJKT is guaranteed under the Education Act 1996, section 28(1), and also the National Education Policy, with the MOE's commitment to maintain
the identity of language and culture while ensuring access, equity and quality of equal education. The MOE respects the right of parents to choose the school stream that is most suitable for their child. In Tamil National-Type Schools, the Tamil language becomes the medium of instruction to facilitate understanding of concepts and strengthen mastery of the mother tongue, with the national curriculum adopted. At the same time, the Malay language as the national language remains a compulsory subject in SJKT so that they can master, our children can master the national language. Co-curricular activities in SJK(T) such as festival celebrations, language and cultural associations, and heritage-based competitions are also supported to preserve the cultural identity of the Indian community. Through the Malaysia Education Development Plan (PPPM) 2026–2035 that is being developed. Specific focus is given to important aspects of education for all school streams. In terms of infrastructure, efforts are being implemented to upgrade dilapidated schools, rebuild buildings and provide basic facilities such as science laboratories, libraries, conducive classrooms, and ICT facilities to create a safe and also modern learning environment. In terms of curriculum and teacher quality, the MOE ensures that the national curriculum is adapted relevantly by strengthening mastery of the Tamil, Malay and also English languages, in addition to providing continuous professional development training to our teachers in schools. Thank you, Madam Speaker.
Batu Gajah.
Thank you, Deputy Minister. I congratulate you on the announcement of the construction of SJKT Ladang Jeram in the 2026 Budget. When will this project start and what facilities will be provided? In addition, what is the Ministry of Education Malaysia's plan to upgrade other SJKTs that are still dilapidated? And will relocation processes be implemented for schools with few pupils? Thank you.
Thank you, Madam Speaker, thank you for the supplementary question from the Honourable Member for Batu Gajah. As the Honourable Member for Batu Gajah said earlier, SJKT Ladang Jeram has indeed— the reconstruction of SJK(T)
The Kuantan Ladang Jeram project was already announced by the Prime Minister, Honourable Tambun, during the tabling of the 2026 Budget. The Ministry of Education (KPM) is now in the process of preparing the preliminary works for SJK(T) Ladang Jeram, which will be located on a portion of federal land under Geran 49529, Lot 122267, Mukim Beserah, Kuantan District, Pahang, and the portion of land involved is approximately three acres. Under the KPM plan, the new development of SJK(T) Ladang Jeram, Kuantan, Pahang, will contain six classrooms, Honourable Member, with other facilities in accordance with standards, and the allocated budget ceiling already provided is RM22 million. That is with regard to SJK(T) Ladang Jeram. For us, it is to provide sufficient learning space and also to meet KPM standards for schools that are more conducive to students' academic and co-curricular activities. The second issue raised concerns the rebuilding of dilapidated SJK(T) buildings. I would like to mention here the Honourable Member for Batu Gajah, that last year, 2024, we completed projects for additional building projects or relocation projects as follows, which are already in operation. SJK(T) Ladang Sagga, the additional building was completed in 2024 and is already in operation. SJKT Simpang Pertang, relocation; SJK(T) Ladang Braunston, relocation; SJK(T) Seafield, relocation. All of these were last year, 2024. Last year, one new school, SJK(T) Heawood, began operating and was officially opened by the Honourable Tambun, our Prime Minister. This year, two schools have begun operating: SJK(T) Ladang Sungai Reyla, in Sungai Siput, Perak. The relocation in 2025 has begun operating, and the additional building for SJK(T) Ladang Effingham also began operating this year. And, for the information of Honourable Members regarding schools with dilapidated buildings, like other schools, SJK(T) also receives full attention. There is one dilapidated school project at SJK(T) Dengkil that has already been approved under the RMK12. The Letter of Acceptance (SST) was issued in November 2024; the progress is 17 per cent, and the schedule and current progress is 23.95 per cent.
This is already 31 days ahead of schedule. And finally, in the tabling or the budget for next year, the RP1 of RMK13 has already
approved the rebuilding of the dilapidated SJK(T) Gopeng building in Perak, with the scope of work to demolish three existing dilapidated building blocks and construct a replacement building block with six classrooms, an administration office and teachers' office, and also a sports store and other additional buildings. Thank you, Madam Speaker.
Pasir Salak.
Thank you, Madam Speaker. Deputy Minister, the shortage of students in SJK(T) has become a worrying issue, especially in rural areas and former estate areas. Factors such as population migration and estate closures have caused the local population to decline, thereby affecting student enrolment. Supplementary question, Pasir Salak: what strategic measures are being or will be taken by the government to overcome the problem of student shortages in SJK(T) in several areas? Including approaches that can be implemented without directly burdening the government's finances. Thank you.
Thank you to the Honourable Member for Pasir Salak for the supplementary question, on the matter of schools with few students. Indeed, we have schools of various streams. Although National Schools, Chinese National-Type Schools and Tamil National-Type Schools experience the issue of student shortages, the approaches taken by KPM to address or manage these under-enrolled schools include, firstly, we hold combined classes. Combined classes means, for schools with fewer than 30 students, Year 2 and Year 3 study in the same class. Year 4 and 5 study in the same class. So, that is the first approach, namely the combined class approach. The second approach is to remain at the existing location, because we take note that there are some schools in nearby areas where there is—there are simply no schools at all. Therefore, if the school is an under-enrolled school, or has fewer than 30 or even 20 students, we need to maintain it to ensure that access to education reaches them. Third, which is very practical, is relocation, namely to move the location of existing under-enrolled schools from areas that may have no student enrolment.
As mentioned by the Honourable Member for Pasir Salak earlier, perhaps on some estates and so on. We identify areas that have higher enrolment, and indeed KPM in recent years has already approved several projects relating to—or applications for relocation, especially from Chinese National-Type Schools. [Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) in the Chair] This year, several schools have already been announced by me. And these are some of the approaches taken by KPM to ensure that the school can be continued and provide continuity in terms of the legacy and history of the school, firstly. Secondly, what is important is that KPM wants to ensure that access to education reaches the places and students who need it. So, access to education is an issue or matter that is given focus by KPM. Thank you, Madam – Dato' Yang di-Pertua.
Thank you, Honourable Minister. Bismillahirrahmanirrahim. Assalamualaikum and good morning, Honourable Members. Honourable Members, the Question Time for Oral Answers now ends. [The Question Time for Oral Answers has ended]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Mr Speaker, "Under Standing Order 12(1), I respectfully propose that the sitting today will not be adjourned until the debate and decision at the Committee stage for the Ministry of Natural Resources and Environmental Sustainability and the Ministry of Education on the Supply Bill 2026 and the Motion on Development Expenditure Estimates 2026 are completed, and after that the House shall be adjourned until 10 a.m. on Thursday, 13 November 2025."
Does any Honourable Member support?
[Bangun]
I beg to second.
Thank you, Honourable Member. Honourable Members, I now put the question to the House for decision. The question is that the Motion as moved just now be agreed to.
[The Motion was put for decision; and agreed to]
Bill — Supply Bill 2026 and Development Estimates Motion 2026 CommitteeBill
The Order of Business was read to resume consideration of the "Supply Bill 2026 DR.30/2025 and the Motion on Development Expenditure Estimates 2026 in the Committee of the whole House." [Fifth Day]
[The House sat in Committee] [Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) in the Chair of the Committee]
Bill — Supply Bill 2026 and Development Estimates Motion 2026 Committee — Head B.23 [Schedule] – Head P.23 [Development Estimates 2026] –Bill
Thank you, Bentara. Alright, Honourable Member. Supply Head B.23 and Development Head P.23 under the Ministry of Natural Resources and Environmental Sustainability are open for debate. Within the debate framework, there are 18 Honourable Members who will debate. The time allocated is five minutes. However, it is at the discretion of the Chairman presiding over the House. And before I begin, I remind Standing Orders 35, 36 and most importantly, 37(2), and not forgetting 41E, namely from the perspective of decorum in this House. The list of those who will debate is: the opener is the Honourable Member for Seputeh, the Honourable Member for Kubang Kerian, the Honourable Member for Mersing, the Honourable Member for Bukit Bendera, the Honourable Member for Setiu, the Honourable Member for Padang Rengas, the Honourable Member for Tebrau, the Honourable Member for Kuala Terengganu, the Honourable Member for Kuala Nerus, the Honourable Member for Jelutong, the Honourable Member for Tanjong Karang, the Honourable Member for Kuala Krai, the Honourable Member for Simpang Renggam, the Honourable Member for Rantau Panjang, the Honourable Member for Dungun, the Honourable Member for Kuala Langat, the Honourable Member for Beruas, and the closer is the Honourable Member for Tumpat. With that, I invite the Honourable Member for Seputeh.
Thank you, Dato' Chairman. I would like to refer to Item 020000 – Geological and Land Management and 040000 – Environmental and Climate Change Management. Dato' Chairman, sometimes we read statements or speeches from the Minister on environmental conservation policy, especially about the government saying it will ban, or as we say, "banned" plastic bags. I agree with the government's policy of encouraging the public to reduce plastic use. My view is that it is very difficult to ban the use of plastic bags, because we need plastic bags to hold rubbish. And when we go shopping at the market, we need plastic bags to hold wet items such as chicken, fish, vegetables and so on. These wet items cannot be placed in cloth bags.
So, I would like to propose to the ministry and the government that they encourage our hawkers and restaurants to use food boxes made of paper materials and use less plastic food boxes. Here, Dato' Chairman, this is something I took from Parliament when the ministry gave us a briefing. This is a box. [Showing a recyclable container] This box is made of paper. All of these are recyclable. So, actually, items like this should be used and encouraged by the government, and not just be for display, shown only to Members of Parliament. So, I want to propose that the government provide subsidies to the industry that produces paper boxes, and I also propose that local authorities formulate a policy requiring our restaurants, hotels and hawkers to use paper food boxes.
If the government provides incentives and encouragement, all of this will succeed. So, I have already read the Federal Estimates of Expenditure book. I found that there are actually no items relating to recycling campaigns and so on. I could only find Item 040100 – Department of Environment. That means, although the Minister who looks after the environment often makes statements like this, it seems that within his ministry there is no specific department for this very important campaign. I propose that the Department of Environment or the ministry play a cross-agency coordinating role across government agencies to make the policy of reducing plastic successful, especially using these paper-based packaging materials. [Showing a sample food container] Dato' Chairman, I would also like to raise the problem in another field, namely the problem faced by surveyors and geomatics professionals due to Act A1730, namely the Licensed Land Surveyors (Amendment) Act 2024. I am still waiting for the reply from the Honourable Minister regarding the fate of those affected. I hope the ministry has the courage to correct the confusion and the burden that should not have arisen as a result of this amendment. Dato' Chairman, before the amendment, graduates in the fields of Geographic Information Systems (GIS) and remote sensing had already carried out their respective professional work. However, now, government officers in agencies such as MYSA, JMG, the Department of Agriculture, JPS, FRIM, and utility companies are no longer permitted to carry out geomatic survey work. This has obstructed GIS activities,
mapping and spatial data collection between ministries and agencies. This amendment also expands the powers of licensed land surveyors. Rather than only title survey, it extends to nine geomatic branches including GIS and remote sensing. Graduates in this field are now required to apply for a licence under very heavy conditions, namely two years of what we call articleship, field training, a written examination and viva voce. Before that, they must pass 10 university examination papers in local universities at a fee of RM30,000. Most of them have already been working or own their own companies. It is unreasonable to force them to bear high costs and lengthy procedures without any guarantee that the licence will be approved. The transitional provisions under section 15 of this Act have not been implemented. I would like to propose that the Honourable Minister meet with the surveyors who are affected or impacted. The Institution of Geospatial and Remote Sensing Malaysia (IGRSM), the Malaysian Hydrographic Association and several other associations. I would be pleased if they were given the opportunity to have a meeting with the Honourable Minister. All 10 fields of survey and geomatics, including: (i) title survey; (ii) GIS survey and mapping; (iii) remote sensing survey and mapping; (iv) hydrographic survey and mapping; (v) underground survey and mapping; (vi) BIM survey and mapping; (vii) engineering survey and mapping; (viii) land survey and mapping; (ix) topographic survey and mapping; and (x) geodetic survey and mapping. Many professionals in this field have long practised lawfully and with high skill, but those who hold title survey licences are now being given automatic licences for all of these fields even without relevant expertise. This is extremely irrational and unfair. We should liberalise the geomatics industry so that it is more dynamic, innovative and competitive, in line with new technologies such as satellite imagery, robotics, machine learning and artificial intelligence. The future of geomatics depends on cooperation across multiple disciplines, not the monopoly of one group. The time has come for us to restore fairness,
professionalism and a progressive direction to this important sector. That is all, thank you.
Thank you, Honourable Member for Seputeh. Before I call the next debater, I would like to take this opportunity to welcome Honourable Members. I am pleased to welcome the visit from the Pahang State Police Family Association (PERKEP) of the Royal Malaysia Police (PDRM), led by the Honourable Datin Sri Sumarnie binti Haris. [Applause] Welcome to the Parliament of Malaysia. I hope today's visit provides benefit and a deeper understanding of the proceedings of the House. Honourable Datin, please convey my regards to the Honourable (K) Pahang Police Chief. Alright. Next, I invite the Honourable Member for Kubang Kerian.
Bismillahirrahmanirrahim, assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Dato' Chairman, for giving me the opportunity to take part. I now go straight to Item 040100 – Department of Environment. Mr Chairman, recently, the Department of Environment informed that our country needs an additional approximately 3,000 personnel for enforcement operations nationwide. At present, we only have approximately 1,111 enforcement personnel. The number of areas that need to be monitored is approximately 64,000. Sources of fixed pollution are spread across the whole country, and the figure of 64,000 only covers fixed pollution sources such as factories, development projects under the Environmental Impact Assessment (EIA), and certain treatment plants. This does not include approximately 33 million vehicles that are also monitored under the Department of Environment. If we make a calculation, with a total of 64,000 fixed pollution sources, our personnel can only monitor approximately 16 premises a month, and this will certainly expose our country to serious pollution. We are worried that if this matter is not addressed immediately, then enforcement cannot be carried out and we will fail to comply with the regulations under the Environmental Quality Act and so on.
For everyone's information, based on data received at the Department of Environment level, we have 11,000 report cases a year that need to be monitored by the Department of Environment. With the rather limited constraints of operating centres, they have to take a long time. For example, in Pahang, we have only three Department of Environment offices. When pollution occurs outside the area, they must arrive quickly to obtain evidence at that time in order to prosecute. A delay in reaching the pollution site causes evidence to disappear, and we are unable to prosecute the polluter in court. This is the challenge faced by the Department of Environment. So, I sincerely hope that this issue is addressed immediately. In addition, if possible, a centralised control system should be established in every industrial zone so that not all factories require our enforcement officers to go. If we have a centralised control system, Mr Chairman, we are confident it will help a great deal, and also the need for new technology such as the use of drones and so on. Second, I go to Item 040300 – Department of Biosafety (JBK). The Department of Biosafety was established with a clear mandate under the Biosafety Act 2007, namely Act 678, to ensure that any entry, release, import or use of genetically modified organisms or GMOs must go through a strict scientific risk assessment, and is sovereignly approved by the Government of Malaysia. This is the existing Act. However, several articles in the recent ART Agreement with America, especially Article 2.11 and Article 2.12, raise very serious questions about the extent to which this Biosafety Act can still guarantee the safety of the nation's biodiversity. In both articles, the government appears to recognise the effectiveness of the United States regulatory system in assessing the safety of agricultural biotechnology products or GMOs, and agrees to facilitate the entry of such products into the local market. In addition, agricultural or food products that have been processed from agricultural biotechnology, such as oil, flour and animal feed, are no longer subject to local approval under the LMO regulations. This is a major challenge with the agreement. Previously, the Department of Biosafety played an important role in ensuring that all GMOs to be imported must go through a risk assessment report presented to the Biosafety Advisory Board and approved by the responsible Minister. But this ART Agreement could implicitly
bypassing that authority, where it requires Malaysia to accept security decisions made by other parties, including under regulatory oversight from the United States.
So the question is, what is the point of establishing the GBK, if there are parties who can through, can bypass the existing regulations? I hope this matter is given serious attention by the relevant ministries so that we do not face major consequences from GMO in our country in the future. Mr Chairman, the next item, I would like to debate item 040200 – Malaysian Meteorological Department, M-E-T (MET). As everyone knows, our country faces flooding almost every year. Recently, MET Malaysia has announced a warning that the Northeast Monsoon this year is operating and triggering continuous rainfall episodes and is expected to cause major floods. MET Malaysia has also issued advisories regarding Typhoon Fung-Wong, which is detected to likely result in thunderstorms and heavy rain. I think MET Malaysia has already provided these early information as preparation made earlier. However, the question is the need for improvements to this agency so that it can enhance its operations, including the use of more advanced current technological tools to help MET Malaysia achieve more accurate forecasts, yes. For example, when a typhoon occurs, we rely on all information from Hawaii, from America's. And sometimes the information sent, we have to monitor, and I am confident the Minister has information on this matter. However, what is important at the ministry level is to look at the urgent needs of this agency, yes, with— so that every time there is a flood, our country suffers losses of almost RM5, RM6 billion. Delays in addressing flood mitigation also expose us to the risk of deaths and the like. Therefore, I see that there is a need for a special fund to be set up. Not just depending on the RMK budget every year. The RMK may be RM2, RM3 billion a year, whereas when a flood occurs, we lose RM5 billion, RM6 billion. I take the experience of the Netherlands as an example. They had to spend hundreds of billions on their one-off flood mitigation project.
so that the country does not face risks in the future. Mr Chairman, I think those are my views, two or three points that I wanted to raise in this debate. Thank you.
Thank you, Honourable Kubang Kerian. Next, I invite the Honourable Mersing. Please.
Assalamualaikum warahmatullahi taala wabarakatuh. Thank you, Dato' Chairman. First, item B.040100 – Department of Environment (JAS). The pollution incident at the Johor River at the end of October 2025 is among the most serious within the past five years. Although water supply has now returned to stability, recurring incidents such as those in 2017, 2019 and 2021 clearly show weaknesses in monitoring, enforcement and coordination between agencies. Therefore, on this occasion, I would like to seek a thorough explanation from the ministry: (i) when will the full investigation report be presented to the public? Is the government prepared to name the companies or individuals involved in the activities that caused the pollution, and to disclose the status of their operating licences, to ensure transparency and public accountability; (ii) JAS currently faces major constraints in terms of manpower capacity and operational allocation. As of 2024, the ratio of enforcement officers to industrial premises is 1 to 385. Far below the international standard of 1 to 150. Therefore, what is the government's plan to strengthen JAS's capacity, including budget, technical training, modernisation of water quality monitoring systems, and empowering its legal authority so that this agency can act more quickly and effectively?; and (iii) what is the government's long-term recovery plan to prevent recurrence of river pollution incidents, particularly through the implementation of the Johor River Action Plan 2030 Phase 2 that was previously announced, including the construction of IOT-based smart water quality monitoring stations
in the main river basins in line with the Zero Polution by 2030 policy? Items B.030200 and P.07100 – PERHILITAN. First, I would like to touch on the Johor Elephant Sanctuary (JES) in Kota Tinggi, developed to reduce human-elephant conflict in Johor. Since it began operations in 2020, JES has received more than 20 elephants relocated from conflict areas such as Kluang and Kota Tinggi. However, the 2025 Socioeconomic Impact Assessment Report found that human-elephant conflict incidents still increased by 18 percent in Johor compared to 2022. This shows that JES's capacity has not yet reached optimal levels. Basic facilities, manpower and integration with local communities remain moderate. Therefore, I am of the view that additional allocations should be channelled to strengthen logistics, human resources and veterinary facilities so that JES truly functions as a conducive and competitive elephant conservation centre like the one in Kuala Gandah, Pahang. Second, regarding the Johor Wildlife Crossing Bridge Project on the FT50 Batu Pahat-Jemaluang road under the Central Forest Spine (CFS) ecological corridor. I understand the tender process was completed in July 2025 and the main contractor was appointed last September. So I would like to know, what is the current status of the preliminary work of this project, including the completion of the final design and the demarcation of the 31,000-hectare area involved. Is this project on track — scheduled for completion within the original timeframe by the end of 2027? Third, referring to the threat of the African swine fever outbreak to the populations of wild boar and bearded pigs, which are the main food source of the Malayan Tiger, food shortages have led to an increase in tiger-human conflict cases around Kahang and Mersing. What steps will the ministry take to reduce the risk of tiger-human conflict, including a more efficient and faster Livestock Compensation Scheme, and ensure the Malayan Tiger population does not continue to decline. Taking into account 2024 data showing that only 85 wild Malayan Tigers remain in Peninsular Malaysia. Next, item B.050600 – Assistance for Property and Crop Losses Due to Wildlife Attacks. This initiative is very important in helping victims of wildlife attacks, especially in forest border areas such as Mersing, Rompin, Gua Musang and Hulu Perak. However, an allocation of RM1.5 million for 2026 is far too small and does not reflect the trend
of increasing cases, which rose by 26 percent in 2024 compared to 2022. For example, for the Mersing Parliamentary constituency alone, applications for this assistance reached RM300,000 for 2025. This does not include other areas in the state of Johor. Therefore, I request that this allocation be increased at least threefold so that assistance can be distributed more fairly and quickly. Next, I would like to clarify — to obtain an explanation of the form and mechanism of this assistance. Is it in the form of cash grants, building material assistance or a compensation scheme based on current market value? This is important to ensure fairness for farmers and livestock breeders who suffer heavy losses from attacks by elephants and other animals. That is all, Mr Chairman.
Thank you, Honourable Mersing. Next, I invite the Honourable Bukti Bendera.
Thank you, Mr Chairman. So, allow me to combine the codes I wish to debate, namely item 03000 – Forest and Biodiversity Management, 030200 – Department of Wildlife and National Parks (PERHILITAN), 050500 – Biodiversity Protection and Patrolling Programme and also 07300, which is the Environmental Conservation and Preservation Division. So Mr Chairman, every step we take on this land should be accompanied by gratitude, not greed. Sustainability is not merely an environmental issue but is about humans who may forget that this earth is the mother who provides food and drink. So, according to the Wildlife Conservation Society, with permission, Malaysia needs at least 5,000 forest rangers to protect Peninsular Malaysia alone. And if Sabah and Sarawak are included, this estimate reaches up to 19,000. But the reality is that the existing number is not even half. So, over the past five years, 490 — 499, sorry — parts of wild animal bodies have been seized. But only 15 living animals could be rescued. So, this is not an achievement. This is a sign of systemic failure. So I would like to ask the Honourable Minister, how much of the 2026 Budget allocation is actually channelled to field enforcement, namely to add rangers, purchase monitoring drones and also finance operations at the borders.
We need people who are brave in the forest, not just on policy papers in offices. I suggest that the ministry expand the Community Ranger Programme. Involve indigenous communities who know the forest's ins and outs best, and also cooperate with NGOs such as WWF-Malaysia, TRAFFIC and Panthera, which have long possessed expertise and also global networks.
Mr Chairman, from 2020 until 2024, more than 2,360 wildlife deaths caused by vehicle collisions were recorded. Elephants, tapirs, tigers, all died on the roads. So, this is not progress but a modern tragedy. I would like to ask the Minister, is every development project required to conduct a wildlife corridor study? If not, we are building a road towards extinction. So, I also suggest that the ministry establish more gazetted archaeological corridors not only to protect forests but to connect habitats that have been separated. Countries such as Costa Rica have proven that sustainable tourism and biodiversity protection can go hand in hand. So, why can Malaysia not become an example in Southeast Asia? Mr Chairman, once the Malayan Tiger walked proudly in the jungle. Now, it is estimated that fewer than 150 remain alive in the wild. If we do not act immediately, the Malayan Tiger will become extinct before our children have the chance to see it in the real world. So, here Bukit Bendera wishes to put forward four matters to the government. The first, create a special allocation solely for the Malayan Tiger. Do not continue to merge it into the general biodiversity fund. This species deserves special attention. The second, improve training, welfare and career paths for PERHILITAN officers. We need officers who are not merely competent but enthusiastic, and above all, possess fighting spirit. So, is the ministry prepared to establish a special scheme to attract more young professionals to join this field? And also, the third, establish strategic cooperation with NGOs and international institutions. They have expertise, satellite data and research networks that the government can benefit from.
And finally, the fourth, implement a national public awareness campaign beginning at the school level so that the younger generation understands that protecting the environment is a moral responsibility as Malaysian citizens. Mr Chairman, if the Malayan Tiger becomes extinct, not only will the species be lost but the nation's dignity will also be buried. We cannot speak of progress if we fail to protect God's most magnificent creation. So, the 2026 Budget must become a moment of change, no longer a routine allocation but a declaration of war against extinction and public destruction. Mr Chairman, the greatest threat to our planet is a believe that someone else will save it, with permission. So, that is all, thank you. Bukit Bendera asks for support.
Thank you, Honourable Bukit Bendera. I invite the Honourable Setiu to speak.
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, Item 020300 – Minerals and Geoscience Department (JMG). There is an increase in allocation for 2026 amounting to RM3,350,300. The first matter under this item relates to the issue of minerals and rare earths, namely the rights of states and the distribution of revenue. Under the Federal Constitution, land and minerals are the absolute rights of the state government. Based on data from the Minerals and Geoscience Department Malaysia (JMG) Terengganu, Terengganu is estimated to have around 7,187,500 tonnes of NR-REE out of the approximately 15.2 million tonnes found across the country. Economically, because REE is highly needed in modern technologies such as electric cars, magnets and electronics, the potential revenue and development of downstream or upstream industries is also very high. We do not want a banana to bear fruit twice, as in previous issues of managing other resources such as oil. Although the Petroleum Development Act 1974 stipulates cash payments to states of five percent royalty, it was changed to ex-gratia payments in 2024 and changed once again to the Federal Government Special Fund (DKKP) with various shallow reasons. Under the MADANI Government, payment procedures have become stricter whereby state governments must now apply and state the purpose of using the funds before payments are disbursed, whereas the Most Honourable Tambun among
those who once fought for a 20 percent royalty for Terengganu. In addition, the procedure for an amount of RM1.43 billion from ex-gratia payments was also once used to cover the costs of LPT 2, whereas it should have used Federal allocations. Therefore, on the REE issue, we demand that the management and distribution of REE revenue be carried out in a fairer and more equitable manner. Next, the second matter under the same item. Although the Ministry of Natural Resources and Environmental Sustainability has tabled the standard operating procedures for REE mining, the main issue is how the ministry intends to effectively drive the implementation of this REE policy at the state level. Among the risks faced at the state level is the issue of enforcement. We are often shocked by reports of intrusion and theft of REE because state enforcement agencies may lack technological capacity or allocations— allocations to monitor large areas. Therefore, I would like to ask, what specific allocations in this budget are channelled to state governments to enhance their enforcement capacity? Next, the third matter under the same item, namely the critical issue relating to approvals and the environment. REE is not like tin mining; it involves complex and risky processes. The issue of approvals is very important because it relates to the need to ensure development projects are balanced with environmental protection, safe waste management and compliance with careful legal regulations. Approval issues especially at the stage of environmental impact assessment (EIA) studies, methods of managing radioactive waste, if any, and strict mining licence conditions. More worrying, a large portion of these REE deposits have been identified to be located in strategic areas, including within permanent forest reserves. How can we balance the aspiration for revenue with the responsibility to protect forest treasures? I demand an explanation from the ministry, what special conditions and guarantees will be imposed if mining in HSK is permitted? And is the budget allocation sufficient to monitor compliance most strictly? Item 030200 – Department of Wildlife and National Parks (PERHILITAN). Next, under this item, namely regarding wildlife complaints. Recently, the media has reported several incidents of wild elephants and sun bears appearing in
Dungun and Kemaman. These reports are not isolated cases. They depict an increase in encounters between humans and wildlife that demand serious attention from the government. This situation is not exceptional in the Setiu District. Until now, the Setiu District still does not have a dedicated PERHILITAN office and has to share facilities with the office in Besut, which complicates daily operations. More worryingly, the existing strength of personnel is only eight officers. A total that is grossly inadequate for managing such a vast area and handling increasingly acute wildlife conflict complaints. I have already raised this matter in the House before. Therefore, I seek clarification from the Honourable Minister. What is the current status of the application to establish a PERHILITAN office in the Setiu district? And what is the status of increasing PERHILITAN's personnel strength there? That is all, thank you.
Thank you, Honourable Setiu. Next, I invite the Honourable Padang Rengas to speak.
Thank you, Dato' Chairman. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Dato' Chairman, under Item B.23 010200 and 040100, the environmental and natural resource management programmes. This ministry plays a very important role not only in protecting the environment but also in ensuring that the nation's natural resources are managed sustainably for the benefit of the people and future generations.
First, the issue of unsustainable development and flood risks in rural areas. In areas such as Padang Rengas, Kuala Kangsar and Sungai Siput, residential and agricultural development often face problems of uncontrolled land and water catchment management, which ultimately result in floods and soil erosion. I would like to know whether, under this B.23 item, the government allocates specific funds for flood risk management plans based on natural systems. Natural-based flood management, with permission, which uses approaches such as replanting riverbank forests, building natural retention ponds and environmentally friendly drainage systems. Approaches like this are not
merely reducing long-term costs, but also strengthening the resilience of the mitigation ecosystem. Dato' Pengerusi, second, under item B.23, 030100, forest area and biodiversity protection. Our country loses nearly 54,000 hectares of forest every year due to logging and uncontrolled development activities. This has a direct impact on biodiversity as well as the stability of the micro-climate. I would like to propose that under this item, the government add allocation for the Forest Carbon Plus Programme, a payment scheme for ecosystem services that provides incentives to state governments and indigenous communities to keep forest areas as carbon sinks. Neighbouring countries such as Indonesia and Vietnam have already started this model with encouraging results. Malaysia cannot be left behind. Third, under B.23, 040100, industrial waste and pollution management. I would also like to touch on the issue of industrial and chemical waste disposal that still occurs in several rural areas. The Ministry must step up enforcement under the Environmental Quality Act 1974 and ensure that every factory is required to have a pollution mitigation plan updated every year. I would like to propose that the government set up a digital environmental monitoring unit under this item, one that uses AI technology, drones and IoT sensors to monitor river water and air quality in real time. Especially in industrial areas and quarries. As in the Padang Rengas area, I would like to raise the issue of dust and noise pollution caused by the YTL cement factory and its quarrying activities. Local residents are affected by fine cement dust, quarry blasting noise and heavy lorry traffic, which affect health and the peace of daily life. I would like to know what enforcement action the Department of Environment (JAS) is taking to ensure compliance with industrial dust and noise emission standards. And will the Ministry make real-time air and noise monitoring systems mandatory for heavy industrial areas like this? The people do not reject development, but they demand development that is clean, responsible and respects the community's right to health. Fourth, community involvement in sustainability. Sustainability issues cannot be left entirely to the government alone. I propose that item B.23 also channel special funds to green community programmes
in villages, to enable village folk, schools and NGOs to carry out activities such as recycling, community solar energy and replanting of local trees. This community approach not only raises awareness but also reduces government operating costs. Fifth, transparency and coordination of sustainability policy. Finally, I seek an explanation from the Minister on the extent to which the National Environment Planning Council (MPASN) plays a role in coordinating all inter-agency policies, especially between NRES, the Ministry of Housing and state governments. We do not want to see federal policy towards sustainability be contradicted in its implementation in the states, thwarting the long-term goals of the nation. Dato' Pengerusi, this B.23 item is not merely a figure in the budget; it is a reflection of the nation's future. If implemented properly, Malaysia can not only protect the environment but also generate a new green economy that provides employment and income opportunities for rural people. I call on the ministry to ensure that this allocation is used with transparency, efficiency and high impact. So that the people see that sustainability is not merely a slogan but a way of life and a development policy for the nation's future. That concludes my speech, thank you Dato' Pengerusi.
Thank you, Honourable Padang Rengas. I now invite the Honourable Tebrau to speak.
Thank you Dato' Pengerusi. I begin with Item 50400. Dato' Pengerusi, in 2014, two pandas, Xing Xing and Liang Liang, arrived in Malaysia from China for 10 years to celebrate the good relations between Malaysia and China. Unfortunately, this year, on 18 May 2025, these two pandas were sent back to China. Over these 11 years, both pandas became a major attraction at the National Zoo, and not only that, Dato' Pengerusi, they also became a symbol of the good relations between China and Malaysia, which China often uses, known as "panda diplomacy". Where the pandas are lent to countries that China considers strategic or with which it has good relations. So, I see that in this year's budget, we have an allocation of RM4.6 million for the Giant Panda International Conservation Programme. So, now the budget is already
there, but so far I see no news at all on whether the pandas will arrive in Malaysia this year or next year. So, I hope the Ministry can give some clarification on whether this programme will continue with the arrival of new pandas from China. Next, to Item 40100 – Department of Environment. I see that this year there is an increase in the budget for the Department of Environment, from RM136 million to RM141 million. For me, that is good. But I also agree with the views of my friends in this august House, Dato' Pengerusi, that more allocation should be given to JAS so that we can strengthen enforcement to control environmental pollution. Just recently, Dato' Pengerusi, from 31 October to 4 November, for five days, nearly 455,000 water account holders and more than 1 million residents of Southern Johor, covering the districts of Pontian, Kulai, Kota Tinggi and of course Johor Bahru, faced a sudden disruption of water supply. The number of nearly 1 million residents affected, for me, as a former state exco in charge of water in Johor, I feel there has never been a case as big as this, where 1 million residents of Southern Johor had no water for at least five days. And the cause, Dato' Pengerusi, was a broken sand-washing pond and its overflow, which caused the Johor River to be polluted. The turbidity level, it reached 37,400 NTU. Compared with the normal level of only 400 NTU. That means nearly 20 times higher than the usual level. So, I hope this issue can be taken seriously by JAS and the Ministry, because as elected representatives, we have a responsibility to the people, and when issues like this are not the first time they happen. Back in 2019, we had an issue at Sungai Kim Kim. Last year we also had an issue at Kampung Maju Jaya. This year, 1 million residents of Southern Johor face water disruption. So, I hope JAS can give some explanation to the questions I want to raise. One, why does JAS in Johor, when it gives its comments,
because I understand that the issue of raw water and mining falls under state authority. And I do not blame SAJ Rainhill, because they only treat the water. Raw water comes from the state government, from the rivers. Why, when JAS gives that comment, did they agree or permit mining to be carried out in an area so sensitive to our water catchment areas?
And second, up to today, what legal action has been taken against the company that caused this pollution, because until today there is no news. What is the latest status and what assurance or what steps will JAS take to ensure these issues do not recur for the people of Johor? Thirdly, Dato' Pengerusi, Item 11800 – National Geohazard Study. Since this year it has been rather strange that in August, September and this month, suddenly there have been earthquakes in Johor. Usually we hear of many earthquakes in Indonesia and the Philippines, but we have never heard of them in the Peninsula, especially in Johor. But suddenly there were earthquakes first in Segamat, in Kluang, in Batu Pahat, so for the people of Johor we are rather worried too. So, I hope the Ministry can give a bit of—more clarification on why earthquakes have suddenly occurred in Johor and moving forward. Is there a forecast that there will be more earthquakes in Johor? That concludes my speech, thank you Dato' Pengerusi.
Thank you, Honourable Tebrau. Next, I invite the Honourable Kuala Terengganu to speak.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, greetings of peace. Thank you Dato' Pengerusi. Item 030000 - Forest and Biodiversity Management. Dato' Pengerusi, I would like to emphasise the importance of the Ecological Fiscal Transfer (EFT) fund, as the main fiscal instrument for protecting forests, water catchments and biodiversity. In Budget 2026, the government maintained an allocation of RM250 million, which is actually the same amount as the previous year. Although this fund provides incentives to states to maintain protected areas, this amount is still insufficient compared with the high costs borne by states for forest management, area restoration and protection of wildlife habitats. Accordingly, an increase in EFT funding should be considered so that the incentives are more attractive and in line with states' needs. This fund should also be given some flexibility, allowing a small portion to be used for other development projects, such as infrastructure and social services, without affecting the main focus of conservation.
At the same time, the mechanism for distributing the funds needs to be examined with a new formula that sets allocation based on 50 per cent of protected area coverage and 50 per cent of conservation performance or quality. The important question that arises is how this system can ensure that small states, but rich in biodiversity, also receive sufficient and fair allocations. Next, I would like to touch on coral reef ecosystems, which are rarely raised. Item 11000 – Marine Geology. Regarding coral reef ecosystems, does NRES have up-to-date data on the health of coral reef ecosystems in the country's waters? Because many states receive spillover from tourist arrivals as well as fisheries resources, they need to ensure that these coral reef ecosystems remain healthy at all times. For example, in Terengganu, Redang Island, Perhentian Island, and also in other states, including Tioman Island and also in Sabah. What percentage of coral reefs are categorised as healthy, stressed or damaged? To what extent is this data updated and disseminated to the fisheries, tourism agencies and state governments? I would like to ask whether there is any form of official cooperation established between NRES and an organisation called Reef Check Malaysia, which is a global initiative that collects data on coral reef health across the world. They have been in Malaysia for 17 years and are understood to always work with various agencies in this country. Is Reef Check Malaysia's data recognised as an official reference data source by the Ministry? Does the Ministry channel funds or technical support to the Citizens Science Reef Check Programme? How does NRES assess the impact of marine pollution? Including tourism systems, sediment flow from the mainland, and oil spills on the health of coral reefs in the Peninsula and in Sabah and Sarawak. Are there risk maps or zones prohibiting certain activities to protect sensitive coral reef areas? What data or studies show a direct relationship between the decline of coral reef ecosystems and the decline in reef fish populations or the catches of coastal fishermen? Does the Ministry cooperate with the Department of Fisheries to strengthen the impact on local fisheries resources?
Next, I would like to touch on Item 04000 – Environmental Management and Climate Change. Dato' Pengerusi, the government is about to introduce a carbon tax as a step towards a low-carbon economy, in line with Malaysia's commitments under the Paris Agreement. However, challenges exist if the implementation of this tax is not balanced with the principle of a just transition. Vulnerable groups, especially B40 households, risk bearing the burden of rising raw material and energy costs. The implementation of the carbon tax must be accompanied by clear support mechanisms, including compensation schemes, green energy subsidies for lower-income consumers, and a transparent and auditable system for measuring and reporting carbon emissions. This is important so that the goal of reducing carbon emissions is achieved without undermining the well-being of the people and the competitiveness of local industry. Last point, Item 02000 – Geology and Land Management. Mr Chairman, the National Mineral Policy 3 (DMN3) was developed to establish a more comprehensive policy in supporting the development of the mineral industry, addressing issues that hinder industry progress and setting a new direction in line with current developments. The question I want to raise is, when will DMN3 be finalised and officially implemented? We cannot keep delaying, because this policy is very important as the main framework for the development of the rare earth and strategic mineral industries of the nation. Besides that, what are the latest developments in the review of the Mineral Development Act 1994? To what extent can amendments to the Act strengthen the management and regulation of REEs in this country, including strengthening cooperation between the Federal Government and state governments in licensing, monitoring and downstream industry development. I would also like an explanation of the latest developments of the Pasukan Petugas Khas (Special Task Force), the direction of REE industry development, including the upstream-level Technical Committee on REE Industry Development led by NRES. What are the developments at each upstream, midstream and downstream stage? And what specific incentives are provided by the government to encourage investment in the REE mining sector and to strengthen downstream processing industry development in the country? That is all, Dato' Pengerusi. Thank you.
Thank you, Honourable Kuala Terengganu. Next, I invite the Honourable Kuala Nerus to speak.
Peace be upon you and the mercy and blessings of Allah. Greetings of peace. Thank you Dato' Pengerusi. I turn to Item 020000 - Geology and Land Management. Terengganu, as we well know, has a long coastline and hillside slopes in the interior, such as in Hulu Terengganu and Besut, which make this East Coast state highly vulnerable to geohazard risks, especially during the Northeast Monsoon that occurs every year. For example, at the end of last year, we witnessed a major landslide on the Jalan Aring – Kuala Jeneris route, which caused a complete closure of the main route to Gua Musang. This incident not only disrupted connectivity, but also raised concerns about the safety of residents and road users. Therefore, what more comprehensive and aggressive approaches to prevent such incidents are being taken by the government to manage the risk of landslides on high-risk slopes? And what early warning mechanisms or more efficient monitoring systems are there to ensure that residents in areas near slopes can receive immediate information and act before fatalities occur.
We do not want landslide incidents like those that recently occurred in several areas of Sabah, which claimed 12 lives, to recur elsewhere. Under the same item, I would like an explanation from the Honourable Minister regarding the construction of the breakwater of the nearshore island breakwater type built at Pantai Tok Jembal, Kuala Nerus. Thank you for the construction, but unfortunately, the construction has not been able to stop erosion from continuing, to the extent that a nearby cemetery, Tanah Perkuburan Pantai Tok Jembal, is still suffering severe erosion, and there is great concern that it will fall into the sea when the Northeast Monsoon season arrives. My question is, at the same time or in the same project, that is, the same type of breakwater, built at Pantai Paka, Dungun, and it is very
succeeded. But why did it not succeed at Pantai Tok Jembal? Is it due to structural differences, or what are the actual factors that caused the failure at Pantai Tok Jembal? Therefore, I want an explanation from the Minister on what plans and immediate actions the government has to ensure that the cemetery land is not eroded and ultimately does not wash into the sea, as happened in the Setiu Parliamentary constituency last year. Mr Chairman, I would also like to touch briefly on the percentage of usage and sharing of integrated geospatial data, which is targeted at 97 per cent in 2025 and 2026, compared with 83.42 per cent in 2024. However, many state agencies and local authorities (PBT) still rely on old and non-uniform mapping systems. Therefore, will the ministry expand training and technical support to state governments and local authorities (PBT) to ensure more comprehensive access to and use of geospatial data? And how does the ministry ensure that geospatial data is used in an integrated manner for land-use planning, disaster mitigation and environmental monitoring? Next, under Item 050600 – Assistance for Loss of Property and Crops Due to Wildlife Attacks (BKHT). Dato' Chairman, an allocation of RM1.5 million has been provided for BKHT in 2026, but there is no information on the claims mechanism or target areas. Farmers and rural residents are often affected by attacks from wild animals such as elephants, wild boars and sun bears. Therefore, what is the BKHT claims mechanism, and to what extent is the mechanism established accessible to village residents and small farmers who find it difficult to obtain up-to-date information? Will the ministry expand this programme to states that frequently face wildlife conflicts, such as the state of Terengganu? Thank you, Dato' Speaker.
Thank you, the Honourable Member for Kuala Nerus. Next, the Honourable Member for Jelutong is invited.
Thank you, Mr Chairman. I would like to touch on two or three matters in my debate. Firstly, Item 16800, namely the High Priority Flood Mitigation Project. In the Jelutong Parliamentary constituency, the Sungai Pinang Flood Mitigation Project is one
flood mitigation project that we have discussed in several Malaysia Plans. However, this project is still in the process of implementation. For the information of Mr Chairman, the area in the Jelutong Parliamentary constituency, especially the DUN Datuk Keramat, Jalan P. Ramlee, is usually synonymous with flooding whenever heavy rain occurs. So, I seek an explanation and clarification on the status of implementation of the Sungai Pinang Flood Mitigation Project, which I believe, if implemented perfectly and immediately and once it has begun to— be implemented, will ensure that residents in the Jalan P. Ramlee area in the DUN Datuk Keramat and also other areas such as Sungai Pinang and Batu Lanchang in the Jelutong Parliamentary constituency will not be affected when heavy rain occurs. For the information of Mr Chairman, the Penang State Government, through the Penang Island City Council, has also implemented several projects in the area, namely deepening and widening of drains so that flooding does not occur as frequently as before. At the same time, I would like to draw the attention of Mr Chairman and also seek an explanation regarding Item 02703 – Mapping. Regarding the steps to be taken so that we clearly show the state boundaries. Kelantan, Terengganu, especially neighbouring states, Penang and Kedah. Why do I raise this matter? Mr Chairman is well aware that although we realise that Malaysia has been independent for about more than 60 years, the issue that often arises is Penang's rights being claimed by Kedah. Yesterday we saw a statement issued by the Menteri Besar of Kedah stating that Penang has been leased by the state of Kedah to— and has been leased, and he claimed at a press conference, perhaps at the sitting of the Kedah State Assembly, the Dewan Undangan Negeri Kedah. He stated that Kedah will begin the process of claiming that Penang be returned to Kedah. So, I as the Member of Parliament for Kedah, Mr Chairman, take this opportunity to ask, how long are we going to play out this polemic? When we were in school, we realised how many states there are in Peninsular Malaysia, including Sabah and
Sarawak. And why is this matter repeatedly raised by the Menteri Besar of Kedah? When we...
Jelutong, Jerlun is asking to interject.
Not giving way. This is a Penang issue, I am not giving way.
Earlier he asked for confirmation from the Member of Parliament from Kedah.
Honourable Member, 37.
I apologise, Mr Chairman. Issues, issues, issues, issues of the sovereignty rights of the state of Kedah, we have a His Excellency the Governor of the State of Penang. Penang is a sovereign state. Penang has its own people, and indeed Penang has its own flag and state anthem. Why is this matter always becoming a polemic? So, I demand on this item, this mapping be done clearly so that students...
Jelutong, once again asking to interject.
Forgive me, Jerlun, this is a Penang issue. Do not make it politics and polemic, Jerlun. Penang...
Clarification, asking for clarification.
Penang is a sovereign state within our federation of the nation.
Jelutong, Jelutong, a little, please.
I will give way to Bayan Baru.
I want to ask Jelutong, is — Thank you, Mr Chairman. I want to ask Jelutong, does Jelutong agree with me that this matter is being played up, often played up purely because of the failure of Kedah state itself, the Kedah State Government itself, which is unable to generate income, generate what, what, economy? And he plays up this issue purely to blur the eyes of the people about that failure. So, he plays up sentiment in order to raise what, what, state sentiment, yes, causing people to forget the failure of the Kedah State Government. Thank you. I seek a view.
Jelutong, Jelutong.
Mr Chairman, I would like...
I ask for the floor, continuation of earlier...
I want to complete my debate. I apologise, I am not giving way to Jerlun. I ask that the debate of the Honourable Member for Bayan Baru be included in my debate. Since we were in school, Mr Chairman, since we were in school we— we learned. In the state— in Malaysia, we have 13 states in the Peninsula, namely Perlis, Kedah, Penang, Perak, Selangor, Negeri Sembilan, Melaka, Johor, Kelantan, Terengganu and Pahang, while including Sabah and Sarawak and three Federal Territories, namely Kuala Lumpur, Putrajaya and Labuan. So, my request, Mr Chairman, with all due respect, is please do not make this issue a polemic and also material for election campaigning. My request on this item to the ministry is that Penang is a sovereign state within the Federation of Malaysia. Penang has its own state, its own people, a sovereign governor, and we have a sovereign state anthem.
So, please heed my advice to irresponsible parties. Mr Chairman, this matter is important. We do not want any dispute to occur between the people of Penang and the people of Kedah. Many Kedah people also come to seek a livelihood in Penang. So, I take this opportunity to ask the ministry and the Minister and Deputy Minister to ensure that we upgrade the mapping system...
30 saat.
Yes–– The mapping system to ensure that our students who study in school realise that Penang is a sovereign state in Penang and no one has any right to claim it, including the Menteri Besar of Kedah and the state of Kedah. Thank you, Mr Chairman.
Next–– thank you, the Honourable Member for Jelutong. Next, I invite the Honourable Member for Tanjong Karang.
Peace be upon you, and God's mercy and blessings. Thank you, Mr Chairman. Tanjong Karang moves directly to Item 02000 – geological and land management, worth RM483 million. Mr Chairman, the management of REE must be based on sound science, geology and technology. Malaysia has enormous potential regarding this REE, specifically the type iron absorption clay, namely dysprosium, terbium, yttrium, gadolinium, erbium and ytterbium types in high quantities in the states of Kelantan, Perak and also Pahang. This type of REE is easily mined without hard ore, only through the process of washing the soil. However, the risk of water and soil pollution is very high if not controlled, due to the high use of chemicals such as ammonia sulphite. Next, Item 020300 – Department of Mineral and Geoscience (JMG), RM85.631 million. JMG needs to be strengthened, not only in terms of technical expertise but also in the area of enforcement. REE is not an ordinary mineral. Therefore, licensing mechanisms, monitoring and traceability systems must be strong so that every tonne of mineral that comes out can be traced and does not leak out through smuggling or manipulation of small mining licences. Next, Item 109000 – industrial minerals of Peninsular Malaysia with an allocation of RM173 million compared with RM6.229 million in 2024. Mr Chairman, sorry, 2025. Mr Chairman, the allocation for this item shows an increase of more than 100 per cent compared with the previous year. This is a very welcome development and should be translated into a value-added approach in the REE or rare earth mineral mining industry in the country. We can no longer repeat the old mistake of being only exporters of raw materials, which only give short-term profits. Malaysia must go further by developing a local REE processing chain including refining and separation plant facilities so that this high-value resource is processed and fully utilised within the country. This step will enable Malaysia to produce high-technology semi-finished materials for strategic sectors such as magnet manufacturing, electric vehicle batteries and semiconductor chips. At the same time, it will place the country in the global ecosystem of the green and digital industries. This is the time for Malaysia to shift from the model
a raw material producer to a strategic mineral-based economy that is competitive and based on local innovation. Next, Item 11200 – research and development of mineral production and processing. An allocation of only RM1.29 million compared with more than RM3 million in 2025. Mr Chairman, Tanjong Karang wishes to express a little disappointment at the reduction of more than 50 per cent in the allocation for R&D under this item compared with the previous year. This sudden reduction raises questions: why, at a time when Malaysia is moving towards developing the rare earth mineral industry, is its research budget being cut? Should the government not be increasing investment in research and development so that the country truly understands the potential of extraction and waste management methods for REE in a scientific and safe manner. Without strength in knowledge and technology, we will only remain exporters of raw materials with high risk to the environment. Tanjong Karang suggests that the government strengthen collaboration between JMG, MOSTI and public universities to develop this industry. Next, a little extra time, Mr Chairman. Item 117000 – mineral information system, an allocation of approximately RM15 million. Mr Chairman, Tanjong Karang greatly welcomes this new allocation and it is very appropriate and strategic for developing an integrated, transparent National Mineral Database that can be accessed across agencies. This database must cover comprehensive information such as source locations, licence status, production volumes and the level of environmental monitoring for each area. Data approval and data transparency are very important, not only to avoid overlapping powers and information between state and Federal governments but also to strengthen governance of the mineral sector and to develop the confidence of responsible and ethical investors. With a robust mineral information system, Malaysia can ensure that every mining activity is carried out in an orderly, monitored and accountable manner in line with the principles of sustainability and sovereignty of national resources. Finally, Item 12600 – upgrading and facilities of JMG laboratories, an allocation of approximately RM7.75 million. Mr Chairman, once again Tanjong Karang welcomes this new allocation totalling RM7.75 million. It is very much needed to strengthen the capability of the Department of Mineral and Geoscience laboratories in research on high-precision mineral analysis facilities
including mass spectrometry and X-ray fluorescence technology for the study of rare earth elements. Lastly, Tanjong Karang wishes to emphasise that REE is a great gift of the Malaysian earth, but its value will only be felt by the people if it is managed with knowledge, integrity and responsibility. Do not let this REE become a new gold that only enriches a few, while the people bear its consequences. Malaysia must emerge as a sovereign, ethical and sustainable REE producer. Thank you, Mr Chairman.
Thank you, the Honourable Member for Tanjong Karang. Next, the Honourable Member for Kuala Krai is invited.
Thank you, Dato' Chairman, for giving Kuala Krai the opportunity to take part in the debate at the Committee stage of the Ministry of Natural Resources and Environmental Sustainability. Dato' Chairman, Kuala Krai would like to refer to the following items. The first is B020300 – Department of Mineral and Geoscience (JMG). Through this item, I would like to refer to the REE issue. Yesterday, 11 November 2025, the Kelantan State Legislative Assembly tabled an urgent motion relating to the natural resources of Kelantan. The motion reads, "Bahawa bahawa Dewan yang bersidang pada hari ini untuk membuat ketetapan mempertahankan kedaulatan dan kelestarian sumber mineral negeri, mempertegas hak negeri dan menolak federalisasi sumber dan hasil mineral tanpa partisipasi negeri". This motion is very important and in line with the spirit of the Federal Constitution, particularly the Ninth Schedule, List II, which clearly provides that all matters relating to permits, licences, prospecting, leasing and mining certificates are the absolute right of the state government. Kelantan has never closed the door to cooperation with the Federal Government; indeed it stands in harmony in upholding efforts to develop the REE and also NREE industry from upstream to downstream in order to uplift the economic dignity of the state and the nation. However, what Kelantan emphasises is that every policy, development plan or international agreement that touches on the mineral resources of the state must go through official negotiations and full engagement with the state government. Kelantan does not want the sovereignty of the state to be threatened in the name of national development.
Kelantan does not want the state's natural resources to be taken without fair distribution of the proceeds to the people of Kelantan themselves. Mineral resources are not merely economic assets; they are a symbol of the dignity and sovereignty of the state of Kelantan that must be defended. Kelantan does not want bananas to bear fruit twice, as happened with the 1975 Petroleum Agreement. Therefore, I stand firmly in support of this motion as a clear signal that the Kelantan State Legislative Assembly is united in defending the rights of the state, so that these natural resources are managed sustainably, with integrity, and bring benefits to all the beloved people of the state of Kelantan. Therefore, I would like to know what this ministry's position is on this issue, especially after the conclusion of the ART between Malaysia and the USA. Dato' Chairman, the second issue or item is B.030200 – PERHILITAN. We greatly appreciate the role of the Department of Wildlife and National Parks (PERHILITAN) as the nation's main bulwark in protecting biodiversity, preserving forest areas and ensuring the balance of ecosystems is maintained. Through this item I have two issues that Kuala Krai wishes to raise. The first is the issue of relocating wild elephants through inadequate allocation. In recent years, incidents of wild elephants entering village areas and villagers' orchards have been increasing. In areas such as Dabong, Manek Urai and many other areas, residents not only lose their crops but also live in fear every time night falls. I have been informed that the operating cost of relocating a single wild elephant can reach tens of thousands of ringgit, including logistics costs, staff, tranquilising drugs and special transport. However, the existing operational allocation under PERHILITAN is still far from sufficient to cover the increasingly frequent incidents. Therefore, will the Budget 2026 under this ministry increase the special allocation under the item Wild Elephant Relocation Operations by establishing an emergency wildlife conflict fund that can be used immediately without lengthy bureaucracy when attacks or disturbances occur? We cannot merely urge PERHILITAN to act but not provide sufficient funds for them to act. Under the same item, the second issue is attacks by bears, monkeys and macaques. Apart from elephants, residents in Kuala Krai are not only facing problems in the village areas
even in the towns they are also facing increasingly aggressive attacks from macaques, monkeys and sun bears. These animals are not only destroying rubber, coconut and banana plantations but have also attacked village residents and young children. I would like to ask whether the ministry is prepared to increase special patrol teams and the number of wildlife traps in high-risk areas, and to increase the number of permanent officers and staff in hot-spot districts such as Kuala Krai and Gua Musang, and to implement a systematic population management programme for macaques and monkeys through relocation or culling. In the past, when RELA was given firearm licences, they often helped with village security, including the threat of wild animals and controlling crop pests such as macaques and monkeys. However, at present RELA no longer has the appropriate authority and resources to carry out that function. Therefore, I ask whether this ministry is prepared to re-examine, together with the KDN or the Ministry of Home Affairs, the role of RELA in the context of rural community security, either through special training together with PERHILITAN or by establishing village early-response teams officially trained by PERHILITAN to help tackle the threat of wild animals while waiting for professional teams to arrive. Dato' Chairman, the third item is B.040200 – Malaysian Meteorological Department (METMalaysia). This allocation is very important because the Malaysian Meteorological Department plays a major role in providing weather forecasts, early disaster warnings and climate change monitoring, which directly affect the safety of the people, economic stability and public order. I would like to record my highest appreciation to METMalaysia Kelantan, especially Kuala Krai, which always keeps up to date with current developments. I have four questions under this item. First, the need to upgrade weather forecasting infrastructure. We often face inaccuracies or delays in weather warning information, especially during the monsoon season and unexpected rain events. There are areas, including in states such as Kelantan, Terengganu and Kedah, that often receive warnings that do not match ground realities. Therefore, will the ministry, through METMalaysia, increase the number of automatic meteorological stations in interior and rural areas, including installing
more rain sensors and small-scale radars that can channel accurate data to rescue agencies such as NADMA, APM and JPS. The second issue is data cooperation between agencies. Is there a problem of data silos between METMalaysia, JPS and NADMA, which operate separately, with the result that...
Honourable Member, 30 seconds.
...flood or storm warnings sometimes do not reach local authorities and the public on time. The third issue is the development of an AI-based forecasting system. In this digital era, is METMalaysia prepared to move forward by using artificial intelligence (AI) technology to predict extreme weather patterns and climate change, and adopt more user-friendly approaches in delivering information? Will the ministry give attention to METMalaysia's information delivery system, which is still too technical and not user-friendly? The public out there does not understand terms such as thunderstorm, isolation or heavy rainfall exceeding 60 millimetres. Just a little, one paragraph. It is time for METMalaysia to develop easy-to-understand communication platforms, including mobile applications that provide concise information and interaction that everyone in society can understand, in the simplest language. Thank you, Dato' Chairman.
Thank you, Honourable Member. Right, the last debater before we take a break. I invite the Honourable Member for Simpang Renggam.
Thank you, Dato' Deputy Speaker. I would like to refer to Item 020000 – Geology and Land Management in relation to 020300 – Minerals and Geoscience Department, as well as the Forest Research Institute Malaysia, 030300. Much has been done by departments and agencies when we touch on management or activities carried out through Item 00117 – Green Technology Project, and also 07301 relating to the development of policies on climate change and reporting obligations under the UNFCCC.
Honourable Deputy Speaker, what we hope for, with the announcement made by the Honourable Minister that the National Climate Change Bill will only be tabled next year, in the next sitting session, is that the ministry and agencies have taken good steps to implement based on the existing guidelines. But the issue before us is that the implementation of policies is not balanced at all. True, we have guidelines, but what about enforcement? What about the readiness of skilled workers or skilled talent who can make green technology and climate change programmes succeed? Because this is important, these matters cannot be seen merely as an ordinary effort but require expertise. The agenda to produce experts and skilled workers must be given priority through the planning and studies that the relevant agencies want to carry out. So, with the absence or unequal implementation, this causes weaknesses in implementation across this sector, becoming an issue to the extent that the expected results are not as planned at the initial stage. Apart from identifying that the policy is not uniform, my second point, Honourable Deputy Speaker, is that I would like to propose that the government consider matters relating to climate change and these studies. Agencies and parties that carry out these studies and reporting must demonstrate accountability. We know that large companies are only able to obtain loan facilities or financial strength to implement green technology and climate change programmes. But if we look at small companies, which we also hope will participate, including cooperatives or the supply chain players, Honourable Mr Speaker, with permission, continue to face difficulties in obtaining financing to carry out these environmentally friendly programmes.
So, there should be an opportunity for these SME or PMS companies, including cooperatives and so on, which are at the bottom, on the ground out there,
to also get opportunities for financing facilities to enable them to implement these green programmes. Thirdly, Honourable Deputy Speaker, I would like to propose that companies, whether local authorities, including state government-owned companies, refer to data that has integrity and reporting methods that are suitable, adopted and accepted by the international community. This is important so that every report we make can gain recognition, not merely reporting the funds we obtain to implement programmes. Finally, Honourable Deputy Speaker, one more matter, with your permission. Study – 11900 Item – National Groundwater Resources Study. This is an important matter. Groundwater sources, such as those in Kelantan or anywhere else, are not just underground water technology or groundwater sources. They require the latest technology. What is the Minerals and Geoscience Department's technology? What technology will be used to make RM5.78 million be spent next year on the study? I understand that study after study has been carried out, but the findings are still not as expected. I once, like my friend from Tebrau, was also an exco of a state government responsible for infrastructure. It has been proven, Honourable Deputy Speaker, that in Johor the water supply for the Istana Johor polo field no longer uses water sources from Syarikat Air Johor but uses groundwater. This is the ninth year, and there has not been any subsidence, nor any settlement as some parties assumed. If we use groundwater, subsidence and so on will occur. States such as Kumamoto in Japan celebrated the 100th year of using 99 per cent groundwater for the supply of 800,000 people in Kumamoto; its water source is underground. Why is Johor, which has the ― has the most data centres in the country, facing challenges with water supply? Therefore, this should enable the Minerals and Geoscience Department to be more serious. Five million is not enough. I hope that for the First Rolling Plan and the Second Rolling Plan, more will be allocated to the Minerals and Geoscience Department so that more up-to-date studies are used in making decisions on national groundwater resources.
So, that is what I want to propose. What is the view of the ministry on this effort and also on the efforts made by FRIM in our country? Thank you.
Thank you, Honourable Member for Simpang Renggam. As a reminder, the one who chairs the Committee is the Chairman, not the Speaker or Deputy Speaker. A reminder. Apart from that, the House resumes sitting as the House. Bentara. [The House resumes sitting] [Timbalan Yang di-Pertua (Dato' Dr. Ramli bin Dato' Mohd Nor)
Honourable Member, we will stop for a lunch and Zuhr prayer break. The sitting will resume at 2.30 pm. [Knocks gavel]
[The sitting was suspended at 1.04 pm]
[The sitting resumed at 2.30 pm]
[Mr Speaker presided over the sitting]
Assalamualaikum warahmatullahi wabarakatuh. The House in Committee. [The House sat in Committee] [Mr Speaker presided over the Committee]
Right, Honourable Members, we continue the debate under the Ministry of Natural Resources and Environmental Sustainability at the Committee stage, and I invite the Honourable Member for Rantau Panjang, five minutes.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Tan Sri Chairman, for giving me the opportunity to join in debating at the Committee stage on Head B.23, P.23, namely the Ministry of Natural Resources and Environmental Sustainability. Tan Sri Chairman, regarding Item 16800 relating to the High Priority Flood Mitigation Project, for which an allocation has been provided
of RM180.14 million. I want an explanation and details of this allocation and the list of flood mitigation projects listed under high priority. And in facing climate change and extreme weather that are currently affecting the world today, what is the country's latest preparation? How far is the dissemination of information and effectiveness in weather forecasting, whether medium-term and long-term? And how many experts are there, and what is the human resource capacity in meteorological, earthquake and tsunami services? I want an explanation from the ministry. And recently we were all informed about the typhoon that struck the Philippines in early October, which had a very big impact, in which more than 300,000 residents were affected. So, I want to know what is the country's preparation in facing the monsoon that is expected to be heading to our country? Heavy rain and stormy waves have a major impact, especially on residents, whether in terms of infrastructure damage or in terms of houses, the economy, crops and so on. So, how effective is the early warning system? I want to know how many warning systems there are throughout the country. And communication systems that are effective, because in times of disaster when electricity is cut off, how far can this system cope if there is no electricity disruption? The same goes for basic disaster-resilient infrastructure. Tan Sri Chairman, if we look at the PPS throughout the country, most of them use schools. And recently, when a strong storm hit Klang, we saw school roofs were even torn off. So, what is the government's preparation when facing such extreme climate situations? So, is the PPS that exists now safe for flood victims and others to occupy if an unusual storm and flood occurs? So, I want to know what the ministry's preparations are and how the planning is done for development approvals? Because we see development areas built in risky areas. How far is the implementation such that every development process must take into account the results or risk studies of every building site to be built, to avoid losses to the community and residents? The same goes for land use plans, to ensure they are truly safe, especially in high-risk areas. The same goes for how far the coordination between
agencies, whether Federal, district and state, is to ensure that in facing extreme disasters we can overcome them. Tan Sri Mr Speaker, I touch on 02801 relating to the Department of Survey and Mapping Malaysia, namely the International Boundary Marking, Measurement and Maintenance Project. In Rantau Panjang, it is at the international border with Thailand. So, how far have efforts been made to mark the Malaysia–Thailand border? As far as I know, the Malaysia–Thailand border lies in the deepest part of the river. How does the government try to ensure that the land-side boundary in Malaysia does not continue to erode? Whenever floods and disasters occur, the land on our side is low, and likewise the effect of the embankment built on the Thai side causes the water current to carry — causing the bank on our side to become narrower, causing our boundary to become narrower. So, I want to know what efforts and cooperation have been done through G2G to overcome this so that we can resolve this issue and it does not have a long-term impact on our country? And how far is the construction of the proposed wall to be expedited? Likewise, the deepening of the river, which has a major effect on flood impacts. Time is nearly up, one more matter, Tan Sri Mr Speaker, namely 060200 – New Policy, which is the Aircraft Charter amounting to RM7.41 million, for which I request an explanation from the ministry. What is the importance of this aircraft charter? And what strategy will be used as a result of this charter worth millions of ringgit? And what savings measures are planned by the ministry so that it does not continue to burden the national finances? And how far is the need for this aircraft charter? That is all, Tan Sri Chairman, thank you.
Right, next I invite Dungun.
Thank you, Tan Sri Chairman, for allowing me to take part at the Committee stage for the Ministry of Natural Resources and Environmental Sustainability. I would like to begin with the beginning of verse 116 of Surah Hud, which means: from verse 116 is: "Then were there not among the generations before you those of virtue who would forbid corruption on earth
except a few among them whom We saved?" So, matters relating to this corruption must be one of the priorities for us to preserve the sustainability of nature. I refer to Item 030100. The issue of forest encroachment and illegal hunting.
I raise the issue involving threats to the country's biodiversity heritage. Forest encroachment and illegal hunting still occur extensively, including in protected areas such as national parks, permanent forest reserves and wildlife reserves. Therefore, a The Star report dated 29 May 2025 stated that Malaysia targets placing 3,000 community rangers (RK) this year, comprising former army veterans, retired police officers and Orang Asli communities through the Biodiversity Protection and Patrol Programme (BP3) to strengthen forest and wildlife enforcement. A New Straits Times report on 22 September 2025 also stated that the country still needs at least 5,000 rangers to eradicate illegal hunting activities and protect existing forest areas and wildlife reserves. The question is, what is the status of the stated appointment of 3,000 community rangers, how many have been appointed and where they are stationed, and what results have been achieved so far? Will the ministry also increase the target to 5,000 rangers by 2026 as recommended by the Conservation Organisation? This is important because we must look at wildlife issues: when their habitats in certain districts are disturbed, it will lead to encroachment into residential areas. This is very important because when it comes to wildlife, fortunately God made these wild animals afraid of humans, and we are also afraid of them. So, they are in a safe condition within their own zones in their habitats. But when their zones are disturbed, they will encroach into human settlement zones, and what we see as the impact is fear, for example when elephants enter villages. It is important for us to ensure that forests are preserved according to each one's comfort zone.
Dungun, excuse me, may I pass.
Sila.
Okay, thank you, Dungun. What— do you agree, Dungun, that we need incentives or compensation for states that do not carry out development in these permanent forest reserves, because they can no longer develop those areas and they need compensation. And one more thing, I suggest that we may amend the National Forestry Act 1984 so that permanent forests or forests that cannot be logged are made into a waqf for survival, the survival of the forest itself. Thank you.
Thank you, Padang Besar. Your input is noted in my speech and I request the ministry's response. The next item is Item 030100, the issue of mountain guides and hiking risk management. The safety of climbers in mountainous areas has regained attention following the devastating tragedy that claimed the life of the late Mustaqqeem Mansor at Gunung Liang, Perak, last October. This tragedy reminds us that the management of hiking trails in Malaysia still does not have a uniform and comprehensive national safety system. Therefore, my questions are: (i) does the ministry intend to make the services of a mountain guide mandatory for every expedition to a mountain or hill categorised as high-risk; and (ii) does the ministry intend to introduce or expand the use of tracking technology and location chips (tracking chips) for all official climbers, particularly on difficult trails. Thank you, Tan Sri Chairman.
Alright. I now invite Kuala Langat.
Thank you, Tan Sri Chairman. I will proceed directly to the matters I wish to raise. The first is Item 07100 – PERHILITAN. The allocation for 2025 is more than RM47 million. For 2026, it is estimated at more than RM82 million. Yesterday I raised this with the Ministry of Rural and Regional Development (KKDW) for the welfare of the community in rural areas. Today I turn directly to PERHILITAN, and I would like to know about the activities carried out by PERHILITAN to prevent wildlife disturbances.
According to reports, there were 38,236 cases of wildlife disturbance in Malaysia from 2012 to 2018. Monkeys were the largest category of complaints, totalling 23,433, followed by wild boars and also elephants. It was also reported that in the state of Selangor itself, between 2016 and 2018, local authorities (PBT) caught 66,867 stray dogs, and the number of monkeys in Selangor was 11,210 in 2017 and 11,711 in 2018. I would like to obtain current statistics, and in general I see that this matter has not yet been resolved. Even in the Selangor State Legislative Assembly, the issue of wildlife disturbance, especially monkeys, is raised every year. So, what methods are actually being used, whether we get information on shooting to scare them away or catching and relocating them. I also think there are activities beyond just that. We do not prevent development, which ultimately forces these monkeys to come out to search for food in the areas that have been developed, but I also see how we can ensure food security for these wild animals, including the monkeys. If we relocate them to the forest, for example the forest in Kuala Langat, or relocate them to the Hulu Selangor forest, they will still come out because there is not enough food. That is why I feel there may be certain allocations that we can consider, so that their habitats are not only places where they live, but also habitats that provide enough food for them. Tan Sri?
Yes, I am looking at the timer. Please ask the technician to fix the timer.
Secondly, concerning Item 07200 – Environmental Management. The allocation for 2025 is more than RM5 million. For 2026, it is RM84 million. That is a very— it has increased very sharply. Item 07300 – Division of Environmental Conservation and Preservation. For 2025, RM400,000. For 2026, RM600,000. Reports show that Malaysia is about to be labelled as the world's dumping ground for the smuggling of e-waste. Since January 2025, seizures of e-waste, or e-scrap, totalled 13.2 billion, and under Ops Hazard 2.0, 1,600 individuals have been detained, with Port Klang among the main points of entry. From August to December 2024, 336 containers were disisa— eh, seized, and 306 e-waste— involving 306 containers of e-waste. And 348 attempts to smuggle
and as a result of this, I see the emergence of illegal factories for e-waste itself. What greatly concerns us is open burning. It was reported in Hulu Selangor and in Kuala Langat that open burning occurred, which ultimately had environmental impacts, environmental pollution, on the people. In the Kuala Langat area itself, for example at FELCRA Batu 8, Sijangkang, where the main contributor was found to be— originated from the United States. I had raised this in the sitting of the Selangor State Legislative Assembly in 2024, and it has still not been resolved to this day. Why? Because I see that such incidents are still happening, and the most recent was in October 2025. When it occurred in 2024, three locations were identified and monitored. 64 notices were issued under the act or law, written warnings. However, I see that seven notices of offence were linked to the act of the PBT, and none of the notices of offence were linked to the Department of Environment or to environmental pollution itself.
And the compounds imposed were only about RM500 to RM1,000 or so. So, I feel that something must be done properly so that, in the end, pollution like this, and the Malaysia that is said to become a dumping ground for e-waste, can be resolved. And finally, Item 08600 – Sustainable Forest Management, and also Item 17200 – Division of Biodiversity and Forestry Management, with allocations that I consider rather large, especially 08600 in 2026, which is RM82 million, and the issue concerns degraded forests. What activities are being carried out? If we look at the campaign to plant 100 million trees, the RELeaf Project 2021 to 2025, how successful is this project or these activities? I also wish to touch on mangrove swamp forests. How far can we also preserve these mangrove swamp forests? And if we look, 50 per cent of the country's land area should be covered by forest, and today, although Malaysia as a whole has 55.3 per cent, in Selangor only 30 per cent remains. We do not deny that a large part of it is for development purposes, but what is important is how, ultimately, with the allocations we have, we can
ensure that these forests are protected as a source of sustainability for our lives and for safeguarding our environment. Thank you.
Alright. I now invite Beruas.
Thank you, Tan Sri Chairman, for allowing me to debate the Ministry of Natural Resources and Environmental Sustainability. I wish to raise three matters. The first is Item 020200 – Department of Survey and Mapping Malaysia (JUPEM). I urge JUPEM to change the current policy of privatising the surveying and mapping of Orang Asli areas in Peninsular Malaysia and the areas of indigenous settlements in Sabah and Sarawak, and to change it to in-house work, with permission, that is, by employing licensed surveyors, because it is more cost-effective. Yesterday we heard the Deputy Minister of Rural and Regional Development state that under the Twelfth Malaysia Plan, the government has allocated RM42 million to survey and map Orang Asli land in Peninsular Malaysia alone, and a total of RM24.43 million has been used but has only managed to survey 30,540 hectares of land. This is very expensive. And we still have a balance of RM17.57 million to be used until the end of this year. So, if— and we receive many complaints from Peninsular Malaysia and also from Sabah and Sarawak that the land of the Orang Asli and indigenous peoples in Sabah and Sarawak is indeed slow to be surveyed because there are no funds. But, in my view, the funds are sufficient, but the way we implement it is indeed costly. So, I hope this privatisation policy can be changed to in-house, with permission. The second matter is Item 030200 – Department of Wildlife and National Parks (PERHILITAN). In May this year, the former Minister, the Honourable Member for Setiawangsa, stated that there were 4,919 human-elephant conflicts between 2020 and 2024, and the losses incurred were RM39.4 million. This does not take into account the many who were injured and the many who died from being killed or trampled by these elephants. The losses are even greater because as long as these elephants roam, plantations and smallholders cannot plant their crops. I see that this problem is still dragging on. So, I request the government— firstly, I request the Department of Wildlife and National Parks to provide a comprehensive proposal to solve this problem, and I request
the government to provide sufficient allocation so that it can be resolved comprehensively. Because otherwise, the losses we will suffer will be greater than the additional allocations we provide. And recently, we also heard of another death in the district of Gua Musang. I want to ask the government, over these five years, how many people have been trampled to death or injured in Gua Musang, the district of Gua Musang, Kelantan? And finally, Item 040100 – Department of Environment. I am disappointed that in my constituency, the district of Manjung, there is no office of the Department of Environment, and this has caused quite severe air pollution. And usually, this open burning and the release of polluting gases occur at night, and action cannot be taken. I urge the Department of Environment to use a satellite system to control and monitor those who pollute the air, because we know that those who are sensitive to polluted air suffer severely, particularly asthma patients and other patients sensitive to unhealthy air. I hope that if the Department of Environment cannot do it on its own, it can cooperate with the local government, but I request that the government provide sufficient funds for this satellite monitoring system. Thank you, Tan Sri Chairman.
Alright, thank you. I invite the last Honourable Member, Tumpat.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Tan Sri Chairman. I refer to Item 050800 – Malaysia Forest Fund. Kelantan has informed the State Legislative Assembly that it is only using 27.2 per cent of the permitted annual logging quota. The question is, if logging is carried out exceeding the AAC, these states are reprimanded. What benefits, incentives and financial returns will the Federal Government provide if these states succeed in reducing logging for the sake of the nation's environmental sustainability? If they are reprimanded more, the incentives given would be meaningless, so they should be given many incentives. That is the first point. Secondly, under Item 030200. I would like to ask the government, what allocations are given to states that manage the care of wild animals? Because today we see that when their areas are disturbed, they wander about. And when they wander, zoos are built. When zoos are built or
provision is made for new habitats, what policy is adopted by the ministry, and how much allocation is given to the states that undertake this? We have also recently noted, in the Women's JKP, that we raised the existence of the Natural History Museum, which was previously located in Putrajaya but is now in only one place that is not at all a museum in nature, which preserves geological heritage to this day but has no allocation, and we see this as a very important matter. The nation's treasures in terms of education on biodiversity are being neglected by the ministry. I want to ask, when will a new museum be built to house these matters? Under Item 060200, I agree with Rantau Panjang's question regarding the leasing of aircraft. Does this also involve the use of drones? Because we know that for the environment, we need more drones than aeroplanes. So, why do we see a new item for aircraft leasing today, but no further explanation about the use of drones and related matters? Under Item 040100, is the government today prepared to enact a new act to ensure that the intrusions occurring throughout Malaysia's forests are given better monitoring? Because today we see that when there is no substantive, overarching law, and only the states make laws, many parties intrude and there is no truly effective punitive action. And today, when we face REEs worth millions and even billions, we see the need for a new mechanism and law that protects the forest and protects the minerals, so that those who intrude, who have the systems, the machinery and the expertise, can be dealt with, and we no longer want our country to become known around the world because many people intrude into our forests.
And today, if the 5,000 community rangers can truly be established, will they be genuinely given the authority and the appropriate equipment to curb these intrusion activities from spreading unchecked? Under Item 050700 – Malaysian Green Technology and Climate Change Centre. Alhamdulillah, two sons of Kelantan, Muhammad Arif Arman
Suddin and Mohammad Azhan Shamsu Anuar, have succeeded in producing aviation fuel from used cooking oil, using this waste oil. What recognition is given by the government, and what assistance and incentive schemes are available to expand this potential? Because we believe we will support this green technology, and this is a new source, and our country, as the largest producer of cooking oil in the world, can gain many benefits from this, and today we are informed that it has passed ISCC, namely the International Sustainability and Carbon Certification, and CORSIA, which has already been used and has gained a place in several countries in the world. Under Item 020300, the Kelantan DUN has debated a motion to control and ownership of REE proceeds by the state. The question is, will the Malaysian Government allow and encourage states such as SG4 states and also Sarawak to independently manage the control and production of these REEs, so that what happened does not happen again, namely how petroleum royalties are paid to our state. Item 11800 – Geohazard Studies, a counter-proposal made by the Kelantan State Government is that the flood mitigation works, which are still not completed today, be converted into flood channels that are more viable for protecting paddy fields, controlling floods and preparing for water crises. This is a very important resource, because we believe, and we know, that Kelantan, Tumpat, Pasir Mas and Rantau Panjang are among the rice granary areas, and this must be studied carefully. Under Item 02811 – Development of the Defence Geospatial System, I would like to ask why there was a significant reduction from RM21 million to only RM6 million this year, because this is a very important matter, namely Defence Geospatial. Why did this happen, and what is the status of the roadmap and the opportunities for green technology and [Unclear] carbon for the East Coast states, especially Kelantan? Finally, under Item 076300 – Division of Environmental Conservation and Preservation, what policies and councils control the development and sustainability of small islands in our country? In Tumpat there are 12 islands that act as ecological barriers against floods, as well as the open sea and rivers. Pulau Suri [Unclear] needs to be protected for habitat preservation and biodiversity, for the sake of environmental sustainability. Likewise the sources of coconut, fish, prawns and
agro-tourism. Therefore, a policy and allocation are needed for the adaptation of these islands to climate change, and we also thank the ministry for recently selecting Tumpat as a centre for mangrove conservation. However, such education programmes need long-term programmes, not one-off programmes, because community education for protecting the environment must benefit and be understood by all levels, because it is the future of the nation. Thank you.
Alright, thank you. Now I invite the Minister to respond to the 18 Honourable Members who have taken part, and the Minister has 20 minutes from now, please proceed.
Thank you, Tan Sri Chairman. Good day and Malaysia MADANI greetings. Tan Sri Chairman, first, allow me to record my highest thanks to the government for allocating a total of RM2.38 billion to the Ministry of Natural Resources and Environmental Sustainability (NRES). This amount comprises operating expenditure allocation of RM1.49 billion and development allocation of RM891.26 million. Tan Sri Chairman, the allocation in Budget 2026 is important for driving NRES to lead the environmental sustainability agenda in line with commitments at the national and international levels. Among the government's main targets are environmental management, climate change adaptation and mitigation measures. Efforts to conserve and protect forests and biodiversity, and to strengthen governance efficiency of funds and natural resources, to ensure the sustainability of socio-economic and environmental development. I would like to thank the 18 Honourable Members who took part in the debate on the Supply Bill 2026 at the Committee stage. Allow me to respond to the debate based on the relevant issues under NRES's purview. The Honourable Member for Mersing suggested that additional allocation should be channelled to strengthen human resource logistics and veterinary facilities so that the Johor Elephant Sanctuary (JES) truly functions as an Elephant Conservation Centre. For the information of the Honourable Member, the Ministry of Economy has approved a development allocation of RM5 million for 2026
for the development of JES phase 2. This allocation does not include the development of physical barriers at JES to ensure human-elephant conflict can be managed better, with an estimated expenditure of RM18.7 million, covering the construction of 5.7 kilometres of physical barriers and 9.3 kilometres of the Elephant Electric Fence System (SPEG). The overall project for phase 2 is estimated to cost RM43 million and is expected to be fully functional by 2028. The Honourable Member for Mersing also asked about the current status of the Johor wildlife crossing bridge project at Jalan Batu Pahat-Jemaluang. For information, the land ownership date for this project is 11 August 2025 and the works completion date is 7 February 2028. Project implementation is so far still on schedule. The Honourable Member for Mersing asked about the ministry's measures to reduce the risk of tiger-human conflict, including a more efficient and faster livestock compensation scheme, and to ensure the Malayan tiger population does not continue to decline. The Ministry and the Department of Wildlife and National Parks (PERHILITAN) are always alert and take seriously the conservation of the increasingly threatened Malayan tiger population, by implementing nine strategic actions for Malayan tiger conservation over a period of 10 years, from 2021 to 2030, which were approved by the Cabinet on 16 June 2021. Three approaches are used to implement the actions and efforts to halt the decline of the Malayan tiger population through enforcement patrols and control, and the protection and conservation of the Malayan tiger's natural habitat. Improving good governance and effectiveness in implementing Malayan tiger conservation, including strengthening initiatives to ensure the survival of the Malayan tiger through the provision of innovative financial instruments and a Malayan tiger habitat accreditation scheme. Next, regarding the mechanism for providing PKHT, the government has...
With the permission of the Honourable Minister, may I ask a question?
Boleh.
Regarding the Malayan tiger, which has already been touched on by the Honourable Minister just now. I welcome what has been stated by the Honourable Minister regarding the actions and approaches taken to
preserve the number of Malayan tigers. Now the number is decreasing; I understand it is now only around 150 or so. Compared to 10 years ago, this is a major reduction in numbers. So, there is a danger, with permission, Mr Chairman, that there is the risk of extinction, with permission.
So, I would like to ask the Honourable Minister. What are the government's efforts in tackling the problem of poaching, with permission, Mr Chairman. In my view, this poaching problem is a very serious one that contributes significantly to the decline in the number of Malayan tigers. What are the actions proposed by the government to overcome or tackle this problem? Thank you, Mr Chairman.
Yes. Thank you, Tan Sri Chairman.
Baik.
As far as I know, the Ministry, every year, we together with the states, we conserve tigers. We also ask our community, we cooperate, we look after this. If there is illegal hunting of tigers, we let the local authorities or the police station or the department know— I am from the ministry. I can help, and then we also know that the tigers are decreasing. I also hope we can make efforts through joint operations with Khazanah with a budget of RM80 million for 2026. I am also now making efforts for us to cooperate together with the community and the departments; if there is good information, whatever intelligence there is, let us know. We can help. Thank you.
After that, I will continue, Chairman...
Teruskan, teruskan.
That is it, Tan Sri Chairman. Where was I, it's gone, it's lost, never mind.
[Dewan ketawa]
Ha, next, regarding the mechanism for providing PKHT. The government has introduced an initiative for assistance for losses of property and crops due to wildlife attacks, PKHT, starting in March 2024 and will be continued in 2026 with an allocation of RM1.57 million. PKHT is a financial assistance provided on a one-off basis to target groups who suffer damage and destruction of property and
crops due to wildlife attacks, subject to conditions stipulated under the PKHT standard operating procedure. The SOP was developed together with technical agencies, among them the Department of Wildlife and National Parks (PERHILITAN), the Fisheries Department of Malaysia, the Malaysian Palm Oil Board, the Department of Agriculture Malaysia, the Department of Veterinary Services and the Department of Orang Asli Development. Applicants can obtain further information about this assistance through these parties. The Honourable Member for Bukit Bendera, how much of the Budget 2026 allocation is actually channelled for field enforcement, including for the Community Rangers Programme? The government is continuing the Community Rangers Programme in 2026, namely RM80 million allocated to appoint 2,500 community rangers. The Honourable Member for Bukit Bendera proposed that the ministry establish more gazetted ecological corridors. Every development project carried out will implement a wildlife management plan and a wildlife impact study in the EIA together with the consultant of the project director at the Department of Environment, to identify the impact of mitigation actions arising from development involving wildlife habitat. The Honourable Member for Bukit Bendera asked about the government's actions to create a special scheme to attract more young professionals to join the wildlife management field. To strengthen the career path of PERHILITAN officers, the department is in the process of strengthening and restructuring staff across Peninsular Malaysia. In addition, several special staff allowances are being reviewed and improved so that welfare and career paths are better. Besides that, the department will also continue the special scheme to attract young professionals that was previously implemented, known as wildlife experts. The Honourable Member for Bukit Bendera proposed that the government implement a National Public Awareness Campaign starting in schools so that the younger generation understands that protecting nature is a moral responsibility as Malaysian citizens. Initiatives to raise awareness of the importance of becoming a source of biodiversity, including the conservation of flora, fauna and their habitats. Several approaches that have been carried out are as follows:
(i) cooperation with the Ministry of Education to include the topic of biodiversity conservation in students' textbooks; (ii) PERHILITAN has implemented the Biodiversity Education Programme for selected primary and secondary school students; (iii) holding public awareness exhibitions on the importance of wildlife and habitats in schools and universities as well as public areas such as night markets and supermarkets; and (iv) holding the Malayan Tiger Safety Campaign to disseminate widely information on the importance of saving wildlife, especially the Malayan tiger species and its habitat. The Honourable Member for Bukit Bendera requested an explanation of the extent of the government's cooperation with NGOs in efforts to conserve the Malayan tiger. Among the cooperation that has been carried out is the National Tiger Survey: (i) with World Wide Fund for Nature, Malaysia; (ii) Malaysian Nature Society and Wildlife Conservation and Science (Malaysia) in 2016 and 2020; and (iii) in the forest landscapes of the Central Forest Spine of Peninsular Malaysia to obtain the population and distribution of the Malayan tiger in Peninsular Malaysia, amounting to RM12 million. Following that, the monitoring programme for the Malayan tiger and other threatened species inside and outside the national park, the Titiwangsa Range, was carried out in cooperation with WWF Malaysia, Malaysian Nature Society, Wildlife Conservation and Science (Malaysia) and assistance from Malaysia to ascertain and ensure the estimated population of the Malayan tiger and other wildlife species in the separate forest areas of the national park landscape. The Titiwangsa Range from 2022 to 2024 amounted to RM19 million. The Honourable Member for Setiu requested an explanation: does the government's Budget 2026 have an allocation for enforcement to prevent intrusion and theft of REE in permanent forest reserves? For the information of the Honourable Member, in Peninsular Malaysia, the Forestry Department Peninsular Malaysia (JPSM) always monitors the country's forest resources from
any intrusion activities into PFR areas (HSK), illegal logging and changes in forest cover using integrated technology such as the [Unclear] forestry system and drones. These activities are also strengthened through JPSM operations that carry out continuous monitoring using satellite imagery on a daily basis. With the frequency of daily satellite imagery observations, JPSM teams always monitor forest cover areas for land-use changes within HSK across Peninsular Malaysia. Any changes and surfaces detected will be documented in a report containing images of the areas involved, location coordinates and the name of the HSK. This report will then be sent to the State Forestry Department for detection and verification on the ground to determine whether the surface is an intrusion or otherwise.
In addition, JPSM is also implementing an upgrade of the e-Geospatial Forestry system, including adding artificial intelligence (AI) features and the use of high-frequency satellite imagery to identify changes in forest areas more accurately and quickly. The Honourable Member for Setiu also asked for an explanation regarding the status of the application to increase the number of PERHILITAN staff in the Besut District. The PERHILITAN Department of Peninsular Malaysia indeed has plans to establish a PERHILITAN Department office in the Setiu district. For this purpose, the PERHILITAN Department has held discussions with the Public Service Department since 2024 and several series of workshops. The details of the 20 positions targeted for the PERHILITAN Department Setiu District Office are being refined, taking into account various aspects including financial implications. At present, all related duties in the Setiu District are managed by the PERHILITAN Besut District Office, which has a staff establishment of eight officers. Next, the Honourable Member for Tebrau asked about the arrival of new giant pandas. For the information of the Honourable Member, the government has agreed that the cooperation project between the Giant Panda Conservation Centre between the Government of Malaysia and the People's Republic of China be continued through the signing of a new agreement on 16 April 2025, in conjunction with the state visit of the President of the People's Republic of China to Malaysia. The signing of this agreement enables Malaysia to receive a new, younger pair of giant pandas for a period of 10
years from 2025 to 2035. Malaysia will receive the pair of giant pandas in mid-November 2025. The Honourable Member for Kuala Krai asked whether there is a special allocation under Budget 2026 to address wildlife conflict, including the cost of relocating elephants. For the information of the Honourable Member, a total of RM8.7 million has been allocated to PERHILITAN through the development allocation under the programme to strengthen concrete mitigation actions and wildlife roadkill, to ensure wildlife concrete is managed better through various activities, including the provision of wildlife traps including for elephants, monkeys and bears. The Honourable Member for Seputeh proposed that the government provide subsidies and incentives to industry to encourage the production of paper boxes and the replacement of single-use plastic. The Ministry takes note of the proposal by the Honourable Member for Seputeh regarding the subsidies and incentives proposed, which is a good proposal and can be considered. The Ministry will work with MITI and MIDA to explore incentives suitable for this matter. The Honourable Member for Seputeh requested the ministry's explanation on whether there is an allocation in Budget 2026 to implement the single-use plastic bag ban initiative and the extent of cooperation between NRES and JAS in implementing the no plastic bag campaign. Regarding the absence of a specific budget for 2026 to implement the no single-use plastic bag initiative, the ministry would like to inform that the ministry is using the existing budget to expand the no plastic bag campaign across the country. Initiatives to reduce single-use plastic, especially problematic single-use plastic, require cooperation from all parties. The Ministry welcomes the involvement of stakeholders and NGOs in ensuring the sustainability of plastic can be achieved.
How many more minutes does the Minister need?
Still a lot more.
Still a lot more, no... [Laughter]
More, more. More, this is only half.
I— may I give the Minister eight more minutes?
Boleh.
After that, the others will answer...
Eight minutes is fine.
Hah?
Even eight minutes will not be enough, Tan Sri. There is still a lot more. [Laughter]
Hah, okay, okay. Go back down again? Want to go back down again?
Tidak.
Okay, then give five minutes.
Yes, okay, allowed.
Yes, okay, thank you. The Minister, please.
Thank you, Tan Sri Chairman. The Honourable Member for Kubang Kerian and the Honourable Member for Mersing requested the ministry's explanation on strategic measures to address the shortage of enforcement officers at the Department of Environment. The ministry and the Department of Environment have studied this matter, and a staffing strengthening paper has been prepared to address the shortage of enforcement officers at the Department of Environment for consideration by the Public Service Department (JPA). In addition, through the Environmental Quality (Delegation of Powers to Government Departments, Local Authorities and Corporations) Order 2025. The Director General has delegated his powers to government agencies, among them the Royal Malaysia Police, the Ministry of Health Malaysia, the Fire and Rescue Department of Malaysia, the National Solid Waste Management Department, and the Department of Wildlife and National Parks. These powers are given to carry out investigation and enforcement for offences related to open burning, illegal disposal, discharge, marine pollution, water pollution, land pollution, air pollution, and offences relating to non-compliance with the conditions of EIA approval. The Honourable Member for Kubang Kerian proposed that a centralised control system be established in industrial zones to improve enforcement efficiency. The ministry welcomes the proposal of the Honourable Member for Kubang Kerian, and this matter will be considered at ministry level. The Honourable Member for Mersing and the Honourable Member for Tebrau asked about the issue of pollution of the Johor River that has affected water supply. The investigation carried out by the Department of Environment (JAS) found that the pollution was caused by damage to the silt pond embankment at a sand mining area. Based on the review, JAS found that this sand extraction activity was also not
subject to EIA report assessment because it involved an area of less than 20 hectares. Accordingly, JAS, together with the Land and Mines Office and the National Water Services Commission, have determined that legal action is taken under the provisions of the PTG Enactment (Licensing) and the Water Services Industry Act [Act 655]. Next, NRES will commit to continue detailed investigation and will take further action, including prosecution, if there is a breach of any provision of law under the Environmental Quality Act 1974. The Honourable Member for Mersing requested the government's explanation on the government's long-term recovery plan to prevent recurring pollution incidents, particularly through the Johor River Action Plan 2030 Phase 2 that was previously announced. For the information of the Honourable Member, among JAS's long-term actions to overcome the problem of recurring river pollution are, firstly, strengthening environmental legislation.
Secondly, a review of the national water standards, taking into account new pollutant parameters. Thirdly, increasing enforcement activities against factories that operate and have the potential to pollute rivers to ensure monitoring under the Environmental Quality Act 1974 and its subsidiary regulations. And fourthly, expanding the network of river water quality monitoring stations in Malaysia and strengthening the national monitoring programme through smart technological equipment and the latest logistical facilities. Nevertheless, the issue of river pollution in this country is very important to be addressed in an integrated manner, with the involvement of the Federal Government, state governments and local authorities, given that the sectors contributing to the decline in river water quality are not only the industrial sector but also other sectors such as urban development, livestock farming, agriculture and commercial activities. Can I go on?
Minister, I think the others, the Minister can answer in writing. Can?
Yes, yes. Thank you.
Landing punya— yes.
Tan Sri Chairman, to conclude this winding-up session, I am pleased once again to record my appreciation and thanks for the views and proposals shared by the Honourable Members throughout this debate.
[Speaking without a microphone] Come on, YB. Pantun.
There is no pantun today.
[Dewan ketawa]
Next time, I will do a pantun. I also hope that the explanation I have given can answer the questions raised by the Honourable Members. I guarantee that any questions I am unable to answer this time will be answered in writing. I hope we can work together for the good of the nation in protecting, managing and preserving natural resources and in facing the challenge of climate change, so as to create a balance between development, people and environmental sustainability for future generations. Thank you. That is all, thank you, Tan Sri Chairman. [Applause]
Alright. Thank you, Minister. The question is that the sum of RM1,495,439,200 for Head B.23, Operating Expenditure Estimates 2026, forming part of the Schedule, be agreed to. [Question put for decision, and agreed to] [Head B.23 ordered to form part of the Schedule]
The question is that the expenditure under Head P.23 in the Development Expenditure Estimates 2026 be approved. [Question put for decision, and agreed to] [Head P.23 approved as part of the Estimates of Expenditure]
Bill — Supply Bill 2026 and Development Estimates Motion 2026 Committee — Head B.63 [Schedule] – Head P.63 [Development Estimates 2026] –Bill
Ministry of Education. Operating Head B.63 and Development Head P.63 under the Ministry of Education are open for debate. I have received a long list for the Ministry of Education. I will read out all these names and each Honourable Member will be given five minutes to debate. The first is the Honourable Member for Kluang, followed by Bagan Serai, Ledang, Kangar, Igan, Kuala Kedah, Klang, Sabak Bernam, Mas Gading, Gua Musang, Tenggara, Pasir Salak, Rasah, Masjid Tanah, Baram, Kulim-Bandar Baharu, Sungai Petani,
Kapar, Sri Gading, Temerloh, Jelebu, Pokok Sena, Selangau, Pengkalan Chepa, Miri, Maran, Bakri, Jelutong, Jerai, Shah Alam, Sik and finally, Bukit Gelugor. We will start with me inviting Kluang. Five minutes.
Thank you, Tan Sri Chairman. Thank you for the opportunity to take part in this very, very important ministry. Before I go into my debate, I would like to welcome the students who are also watching, witnessing the debate this afternoon. They are the future of our nation, and the issues they are witnessing, this afternoon's debate, are also very important and directly related to them. So, I would like to refer to Item 030000 – Education Operations. According to statistics dated 24 September this year, the Ministry of Education is the largest employer in the Federal Government. As much as 39.15 per cent of the 1.3 million civil servants are MOE staff, equivalent to 511,345 people for next year. The Ministry of Education expects that 509,451 staff will be needed to operate early, primary, secondary and post-secondary education. This shows that human resource management needs to be given serious attention to ensure every school has sufficient teachers. Here, I would like to seek an explanation. Does the Ministry of Education intend to implement a mutual exchange system, like the one the Ministry of Health has just introduced for nurses starting 1 October this year? This is very important because usually, Members of Parliament receive many requests and also letters of appeal from teachers in the constituency so that they can transfer to other areas or closer to—to their families, and I believe that with such a mutual exchange system, it may solve, not entirely but part of the very, very big human resource management problem in the Ministry of Education within the Federal Government. The second issue, early education and preschool. I would like to refer to Item 030100 and also 00100. In July this year, the Honourable Member for Tambun announced the implementation of compulsory preschool education at the age of five. After that, the Minister of Education informed that a special committee on pre-school restructuring would be set up to study the proposal.
I support this proposal. However, the question is, does the ministry have a detailed plan to increase the capacity of existing preschool classes? According to data on the Ministry of Education's portal, the number of preschool pupils under the—under the schools of the Ministry of Education is now 215,683. Meanwhile, the number of births in 2024 was 414,918. This means there is a capacity gap of about 200,000 people, 2,000—200,000 additional places that need to be filled. Unless all these pupils have the ability to follow preschool education at private kindergartens. A follow-up question, what about the position of private preschool classes? So this means, okay. Never mind, not all these pupils will enter, even though preschool is compulsory, but not all will attend schools under the MOE, private ones are also recognised, and what about compliance with the law? Are there private kindergartens that do not comply with certain laws? For example, they do not even pay the minimum wage, but do we want to recognise such early education institutions as well? Because this is education for the future generation. If there are preschool education institutions that do not follow our own country's laws, how about those standards?
So, I request a detailed roadmap for expanding preschool capacity under the MOE. Tan Sri Chairman, the third issue is integrated learning and co-teaching. I would like to refer to Item 020100 – Education Policy. Recently, the ministry informed that integrated learning and co-teaching will be implemented starting 2027. The Director General of Education has explained that it is only for one subject and only starts in Standard 1 using the new syllabus. However, many outside are still confused because there is little exposure to this pedagogy, even though co-teaching is actually not a new thing. Many private schools have already implemented it. So I request the ministry to give a detailed explanation so that good policy is not rejected simply because of misunderstanding. Tan Sri Chairman, the fourth issue, this is the last issue I want to raise here, is Item 040500 – Malaysian Examinations Council (MPM). The ministry mentioned the need to strengthen character education in the new syllabus. However, its implementation cannot be through a written examination system alone. We all know that the Moral Education subject in SPM has so far been such that
it can be passed if students fill in answers even though the answers are not related to the questions. Perhaps you cannot get an A, cannot get grade A, A+, A-, but as long as there are answers written and not nonsense. Even if the answer is not related to the question at all, you can get marks, and we will get grade F, we will not fail. I have proven it, because before, I deliberately did not want to answer the Moral Education questions, but in the end, the person who gave marks to my paper refused to fail me. Tan Sri Chairman, I wanted to get grade F for my Moral Education, I also failed because I wrote answers. So, what is the real standard when we assess Moral Education in this subject? So my suggestion is, to assess the character of future generation students, not through examination papers. I suggest that the assessment of this subject be carried out through a project-based approach, with permission, project-based, that assesses community involvement, teamwork, teamwork, community service activities, application of values in real life, not through test papers. That does not mean...
Time, Honourable Member.
...And not memorisation for examinations. With this, I fully support the budget for the Ministry of Education. That is all, thank you.
Alright, thank you. Next, I invite Bagan Serai.
Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you, Tan Sri Chairman. I would like to debate Item 030000 – Education Operations, specifically to touch on the co-teaching method as mentioned by the representative from Kluang, which will be implemented in 2027. The meaning of this co-teaching method is using an approach of one teacher and a teaching assistant in one classroom working simultaneously, that is combining in one, in several subjects. For example, Mathematics and English being conducted simultaneously. The basis is to provide an interactive learning environment. However, there are several questions that need to be answered because there has also been debate among educators. First, the government needs to clarify the confusion in the distribution of responsibilities between the teacher and the teaching assistant in one classroom, one.
Second, what is the difference in experience of the approach, perhaps two teachers or a teacher and an assistant, there may be quite significant differences in experience. How will this be standardised, because this will have a bad effect on the students who study in that classroom. Third, what is the number of teaching assistants that must be available for one school in realising this teaching method? Because we know that schools in rural areas are small in size, or sometimes schools in urban areas are large in size, with students packed at 45 people. Perhaps rural students, their students are only 25 people. These are conditions that need to be taken into account in implementing this programme. Fifth, can the government guarantee that this method will not burden teachers? Today these teachers are already stressed, actually. I know my wife is a teacher, right, in the end she also took—took early retirement, Tan Sri, right. With the current situation of using all sorts of methods today. We do not want, let them be in a happy condition because the task of a teacher is a noble task. Because Imam Shafie said [Spoken in Arabic], "The duty of a teacher is almost like that of a messenger." Sixth, has the MOE carried out a pilot project for some time to determine the effectiveness of implementing this programme, in terms of teacher workload, in terms of implementation, teachers' responsibilities, it must be implemented in that way. Next is 050200 – In-Service Training, namely the training allocation has decreased. Last year it was 20 million, this year about 19 million. So it means a drop of one million. With the very many education issues today, suddenly we see this allocation, training and service of teachers being reduced. It should be increased because we understand that many education issues happening in schools today require more professional training and so on. Second, to what extent does the ministry take into account the views of teachers and educators who are directly involved with these students in resolving issues that arise, such as bullying and so on. 060600 – Sports Assistance. So competitions are sometimes many, school children who study in schools especially in our area who
represent the district, that is fine, representing the state, representing the country, they have no allocation to represent. I have just received from my staff earlier about a Bagan Serai citizen who will represent the country in hockey at the international level in Perth, Australia, but suddenly there is no allocation from the Deputy Minister. This is a strange thing. So, how much money can we give, really? We can give a token of remembrance to them, but if we want to develop sports assistance like this, we need to take into account in the budget how to send our representatives who will represent at the international level. Tan Sri Chairman, the next matter concerns issues related to the Bagan Serai area. The first is the staff room at Sekolah Menengah Kebangsaan Bagan Serai that has been burnt since 5 February 2023. Until today it has not been rebuilt. It has been more than two years. This staff room was burnt. The second, the condition of the hall at Sekolah Menengah Kebangsaan Bagan Serai, which is unsafe to use, even for the SPM 2024/2025 examination, this examination hall cannot be used. The third is the construction of Sekolah Menengah Kebangsaan Pelangi Perdana, Batu Enam, bordering Bagan Serai. This school has been erected since 2018, until today the project is abandoned and so on. The fifth is—the fourth, the construction of a new building for use as the Kerian vocational workshop which is still not completed. Thank you, Tan Sri Chairman.
Alright. Next, I invite Ledang.
Thank you, Tan Sri Chairman. Assalamualaikum warahmatullahi wabarakatuh. We are debating at the stage of the Committee of Supply 63 and Development 63 of the Ministry of Education. First, I want to state that we all agree that education is the backbone of a country. It is the foundation to build the future generation.
As one of the ministries that consistently receives among the largest Federal allocations every year, it is very important that we continue to invest wisely and effectively in the national education system.
So, I would first like to refer to Item 060400 – Special Needs Student Allowance and Item 060800 – Boarding Food Assistance. These relate to allocations for student welfare, an increase of RM69.7 million and RM252.8 million respectively. This is a step that is highly encouraged because it reflects the government's continuing commitment to student well-being. However, when we examine the total operating expenditure estimates under Item 20000 – Services and Supplies. The total operating expenditure is actually smaller compared with the previous year, namely RM4.48 billion in 2026, RM5.343 billion in 2025. So, there is actually a slight reduction. I understand that between 2022 and 2025, the ministry approved 88 new schools. An additional 38 more schools were approved under Budget 2026. Making a total of 126 new schools approved since 2022. So, together with this, we are also well aware that 17 new schools have started operating this year and now there are more than 10,000 schools across the country. So, I see that with this increase, I think there must also be an explanation of why operating expenditure appears to be reduced. Although we understand school development falls under development, but after building in 2022, 2023, 2024, it must mean there is also operating expenditure. But when viewed in terms of expenditure, there is a reduction in operating expenditure. Although the construction of new schools, we certainly understand, can reduce overcrowding in schools, I am concerned that older schools that are still operating—that have been operating for a long time but do not have sufficient allocation for maintenance and their basic needs. There are still many schools throughout Malaysia that need repair and maintenance works to ensure that students enjoy adequate facilities to maintain quality education. Therefore, I hope the ministry can take this matter into account so that existing schools are not left behind in the wave of new construction. Tan Sri Chairman, regarding the issue of new schools, Ledang also wishes to draw attention to Item 00102 – Primary Academic. In my Parliamentary area there is one new school construction project, namely SK Bandar Baru Tangkak, which has been approved under the (RMK12) Twelfth Malaysia Plan, Rolling
Plan 5. This project is now at the final stage of construction. I would like to request an explanation from the Honourable Minister and Deputy Minister regarding the expected completion date of the school. In connection with that, also under Item 01000 – Education Buildings and Offices, State/District. I would like to raise the District Education Office Project, PPD Tangkak, which was approved under RMK12, Rolling Plan 4, the project scope, schedule of accommodation, with permission SOA, as well as zoning, have been finalised. And a notice of variation application for cost adjustment was submitted to the MOE on 23 April 2025. Therefore, for the local education authorities in Ledang, I request an explanation of the expected timeline for completion of this project and call on the ministry to continue to provide cooperation to ensure this project is completed on schedule and without any delay. Finally, Tan Sri Chairman, following the oral question number four this morning relating to the installation of CCTV in schools. I would like to ask, to what extent does the ministry intend to allocate funds to improve student safety and school security comprehensively? I suggest that the ministry consider creating a new item under the budget specifically for school security, including the installation and maintenance of CCTV. With reference to the Deputy Minister's answer this morning, I would also like to obtain an explanation on the long-term maintenance model under operating expenditure, considering that CCTV maintenance involves matters such as service level agreements, with permission SLA, with vendors, warranty period, as well as whether schools will receive specific maintenance allocations for such systems. If the warranty is one year, but what about when it enters the second year, the third year? So, I hope this matter receives consideration and is thought through thoroughly by the ministry. That is all I wish to raise. Thank you, Tan Sri Chairman.
Alright, next I invite Kangar.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you.
Tan Sri Chairman. Today I continue the debate at the Committee stage for the Ministry of Education (KPM). I begin with words of wisdom. "If you want to see the future of a nation, look at how its education is today; education is the bridge between poverty and prosperity". Nelson Mandela. Mr Chairman, I turn to Item 01300 – Special Education. Special education is very important in today's modern education system. All pupils must obtain the right to learn to ensure that they too will achieve success compared with other students. So for special education, the actual expenditure in 2024 was RM65 million, rising to RM124 million in 2025, and rising to RM212 million in 2026. My question is, what is the KPM's strategy in increasing development expenditure for special education? Can KPM explain the total development allocation for special education programmes in Budget 2026, including the categories for primary schools, secondary schools and pre-schools? Thirdly, what is the actual utilisation rate for infrastructure development of special education schools nationwide in 2025, and how many projects have yet to be completed? Does KPM intend to add more Integrated Special Education Schools (PPKI) with modern facilities that are friendly to persons with disabilities (OKU), and to improve accessibility such as special lanes, toilets for OKU and so on. Mr Chairman, I turn to Item 00102 – Academic Lower Secondary. So, the actual expenditure for 2024 was RM336 million. For 2025, RM583 million. The budget for 2026 has increased to RM1 billion, a rather high figure. My question is, does this figure include the upgrading of dilapidated schools throughout Malaysia? In the Kangar parliamentary constituency, SK Seri Indera requires an open hall. Given that this school has a population of 835 pupils and 55 teachers. And this hall can be used for curricular activities as well as co-curricular activities. And SK Seri Indera is also preparing a school surau for the spiritual activities of the pupils there. Next, I would like to touch briefly on Tingkatan 6 (Form Six). Although Tingkatan 6 is a pre-university pathway, public perception still regards it as a second choice after public higher learning institutions (IPT) and matriculation. This is caused by a lack of promotion and understanding of the advantages of Tingkatan 6 and of the recognised STPM examination. I request that KPM
make every effort to raise more awareness, because people do not like Tingkatan 6, they really do not like it. This is because those who like it go straight into public universities (IPTA) or matriculation after SPM, and so on.
So, there is less interest in entering Tingkatan 6. So, I propose to KPM that with the construction of Tingkatan 6 colleges, Tingkatan 6 can be restored as a dignified pathway of choice. Finally, Item 00202 – Malaysia and State Sports Schools. RM6.9 million in 2024, RM17.7 million in 2025, rising to RM31.1 million in 2026. So, with this increase in allocation, SSM and SSN will be able to improve their respective performance, and thank you to KPM for helping SSM Perlis upgrade its infrastructure. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] Only, I would like to ask about the Bukit Chabang Sports School. The Bukit Chabang Sports School is said to begin operations in 2026. I want to ask, is it true? I want confirmation. And in conclusion, education is not merely knowledge but is an investment in the future of the nation and of generations to come. Thank you.
Thank you, the Honourable Member for Kangar. I invite the Honourable Member for Igan.
Thank you, Madam Chairman. Madam Chairman, assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Igan proceeds directly to Item 040100 – Teaching and Learning Materials. Igan wishes to raise an important issue in the effort to provide for digital technology-based learning, particularly for schools in the rural and interior areas of Sarawak. The implementation of digital education requires a stable Internet access and sufficient devices. However, in Sarawak, most schools still do not have adequate Internet connectivity. Basic infrastructure is still weak, a shortage of
digital teaching devices and equipment, and digitally competent teachers who are prepared and trained. Madam Chairman, if this issue is not addressed comprehensively, it will create a new gap, namely a digital divide between urban and rural pupils. Frankly, Igan is rather sceptical about the implementation of the Digital Education Policy in Sarawak because the basic digital infrastructure is still inadequate and weak. According to the reply from the Honourable Deputy Minister of Education in this House during the previous session, only five secondary schools in Sarawak have been equipped with 25 smart board units and 50 smart TV units. Besides that, a total of 17,799 laptop units were supplied for computer lab facilities, including 905 printer units, 885 projector units and 754 charging card units. Overall, the total number of devices supplied to schools in Sarawak is only 20,346 units. Madam Chairman, the number of devices, smart boards and smart TVs supplied by the Ministry of Education is very small compared with the total of 1,459 schools in Sarawak. Digital education is not merely a policy, it is a moral and national responsibility. Therefore, Igan wants to know the ministry's plans to ensure that the Digital Education Policy in Sarawak can be implemented comprehensively and effectively. According to the estimate for Budget 2026 under Item 040100, the Ministry of Education received a significant increase of RM87,438,000. Please state in detail when the ministry will supply smart boards, laptops, smart TVs and other devices to schools in Sarawak? How much of the Budget 2026 allocation will the ministry use for such supply? Igan also proposes that the ministry strengthen digital infrastructure by upgrading Internet access through high-speed satellite such as Starlink, and provide alternative electricity supply, namely hybrid solar, for interior schools without a stable energy source. Igan also proposes that the ministry implement a targeted one-pupil-one-device programme for B40 pupils in rural areas. And at the same time, establish school gadget lending centres for digital assignments. Igan also proposes that the ministry carry out a school digital trainer programme to train teachers as ICT leaders.
Igan also wants to know how far the implementation of the Digital Education Policy in Sarawak has progressed since it was launched? And what problems have been faced and what action has the ministry taken to overcome these problems? Madam Chairman, next, under Item 060600 – Sports Assistance, Item 06200 – Sports Management. Igan also wishes to raise the issue of financial allocation for implementing co-curricular, sports and games activities for schools in Sarawak. Especially schools in the rural interior. Sports and co-curricular activities are an important component in forming the personality and character of pupils who are balanced in terms of physical, emotional, spiritual and intellectual development. However, the reality on the ground shows that many rural schools, including those in the Igan parliamentary constituency, face serious financial constraints in carrying out various activities. Madam Chairman, according to the information I have, the formula for channelling allocations from the Ministry of Education to schools is based on pupil enrolment. For example, for primary school sports assistance, schools with one to 50 pupils will receive RM200 a year. Schools with 51 to 100 pupils will receive RM400 a year. Schools with 100 to 150 pupils and above will be allocated RM4 per pupil a year. Meanwhile, secondary school co-curricular activities are allocated RM6 per pupil a year. Madam Chairman, the allocation channelled by the Ministry of Education is very small and insufficient for schools to organise co-curricular activities. Besides that, the ministry's allocation channelled to the District Education Offices is also very small. Where each PPD receives only RM2 per pupil a year for primary schools and RM4 per pupil a year for secondary schools. Madam Chairman, since time does not permit, finally Madam Chairman, Item 01000 – State and District Education Buildings and Offices. Igan wants to know the current status of the reconstruction project of the Daro District Education Office. Will this project be built under Budget 2026, and what is the estimated cost of the project? Madam Chairman, Igan also wishes to take this opportunity to inform that Igan, together with the Honourable Member for Batang Sadong, has not yet received a written reply from the Ministry of Education for the debate at the Policy stage.
Finally, Though there be no money or ringgit, My body and soul I surrender; Though earth and sky should clash together, Igan supports the Ministry of Education's budget. Thank you.
Thank you, the Honourable Member for Igan. I invite the Honourable Member for Kuala Kedah.
Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Madam Chairman. I proceed directly to Item 020100 – Education Policy. Rampant bullying, criminal cases and social ills among teenagers that are frightening have become the greatest challenge for KPM. It is not only about producing pupils who excel academically, but also individuals who are courteous, sensitive and of noble character. The question now is, how far can the School Curriculum 2027 (KP2027) truly meet the demands of the education reform that has been much trumpeted? I understand that there are specific areas such as spirituality, values and citizenship, and character activities scheduled in teaching time under KP2027. This is a positive step that is in line with the spirit of the National Education Philosophy to produce individuals who are balanced in terms of physical, emotional, spiritual and intellectual development. However, the reality on the ground shows that this aspiration has not yet permeated school culture comprehensively. Many teachers still lack training to integrate values into daily teaching. And without the support of parents and the community, the values built in school easily erode when pupils return to the outside world. Especially in the borderless online world. Therefore, I would like to pose a question to KPM. What is the actual mechanism being implemented by the ministry to ensure that the development of character and manners is truly alive in the daily practice of schools? Not merely mentioned in curriculum documents. How far is KPM prepared to strengthen teacher training, monitoring of school values and parental involvement so that the values of respect, courtesy and empathy become a culture, not a slogan.
And how does KPM ensure that the good values taught in schools are also supported by parents and the community so that there is no conflict of values between home and school.
Madam Chairman, Item 040200 – Assessment. The abolition of UPSR in 2021 and PT3 in 2022 has been a subject of talk up to today. Now, the implementation of KP 2027. Will the SPM, which is being reviewed under the National Assessment System Review by the Malaysian Examinations Council (Lembaga Peperiksaan Malaysia, LPM), also be abolished? The official justification of KPM when abolishing UPSR and PT3 was to provide room for holistic assessment and to reduce examination pressure. If the same principle is applied, then SPM can also be considered for abolition in stages, but only after the PBS and PBD systems at the upper secondary level are truly mature. Therefore, I request that the Minister of Education state whether the government intends to abolish the Sijil Pelajaran Malaysia (SPM) examination in future in line with the implementation of the School Curriculum 2027 and the Competency-Based Assessment System, and what alternative form of assessment is being studied to ensure that the assessment of pupils remains transparent, fair and accepted by industry. What impact studies have been carried out by the Malaysian Examinations Council on the effectiveness of PBS as a replacement for the central examination system? And does KPM intend to establish a national digital portfolio system for pupils as the basis of continuous assessment if SPM is abolished in future? Madam Chairman, Item 010500 – Information Technology, read together with Item Development Meaning 04600 – School Computerisation System and Institutes of Education. A total of 312 schools in Kedah have been listed to be fitted with optical fibre facilities, fibre optic, with respect, for more stable Internet network access. This shows that the infrastructure effort is under way. However, this data only shows the number of schools selected, not all schools or the complete readiness grid. Therefore, I would like an explanation: how many schools in Kedah have reached 100 per cent readiness with pupil devices and Internet access based on the KP2027 modules that will be implemented? Please also state the comparison between districts within the state. Furthermore,
what form of data on active pupil use of digital platforms in Kedah, for example DELIMa login, projects or portfolios? And what intervention measures are there for pupils with less access? And finally, Madam Chairman, Item P.63 00102 and 00201 – Academic Lower Secondary and Academic Upper Secondary. In this item, I would like clarification on the current status of the construction projects of primary and secondary school buildings within the Kuala Kedah parliamentary constituency. I ask because we cannot enter the school compounds, we can only see from the outside. What is the total development involved and the RM value allocated? And what form of project monitoring mechanism has been put in place to ensure that the projects are completed within the stipulated timeframe? That is my debate. Thank you.
Thank you, the Honourable Member for Kuala Kedah. I invite the Honourable Member for Klang.
Thank you, Madam Chairman. As the representative of the Klang constituency, which is developing rapidly and is densely populated, I would like to raise the issue of the lack of school infrastructure that is suitable and sufficient to meet the educational needs of our children. Many parents and teachers have expressed concern that the existing school buildings are no longer able to accommodate the increasing number of pupils, especially in areas such as Klang Utama, Bandar Bukit Raja, Pandamaran and Parklands, and also Bandar Botanik. I have proposed this matter many times. I need a new school there. I trust the ministry will look into this matter. I would also like to ask the ministry, what was the actual amount spent on school infrastructure development in Klang in previous years? And is there any specific allocation in Budget 2026 to upgrade or build new schools in this area? Based on the Federal Expenditure Estimates 2026 document, the Ministry of Education has been allocated RM66.2 billion. Of this amount, activity 010300 – Infrastructure Development received an allocation of RM23.3 million for services and supplies and RM18.16 million for
assets, making the total RM41.46 million for education infrastructure development. I urge that part of this allocation be channelled specifically to schools in Klang that face not only the problem of pupil overcrowding but also dilapidated buildings, a shortage of classrooms and inadequate basic facilities. This is important to ensure a safe, conducive and quality learning environment in line with the National Education Aspiration. I urge that the allocation under Budget 2026 for the construction of new schools, particularly under activity 010300 – Infrastructure Development and activity 010400 – Asset Development under the Ministry of Education, be used transparently and effectively to expedite school projects in Klang. We can no longer postpone basic educational needs, especially in densely populated areas like Klang. Every postponement is a loss to the future of our children. Madam Chairman, I would like to touch on the situation of Tamil schools in our country, which are still struggling with a shortage of funds and basic facilities. Many Tamil school administrators have to find their own way to cover operating and maintenance costs. I propose that the government set a clear and organised allocation for every national-type school and national school, Chinese or Tamil national-type school, or religious school, so that no school has to compete with each other to obtain funds. A fixed and transparent allocation will enable more effective and fair long-term planning. I would also like to record my thanks to the Honourable Prime Minister for his commitment to rebuilding Sekolah Jenis Kebangsaan (Tamil) Ladang Jeram in Pahang. However, in the meantime, there are also schools whose construction has stalled, such as SJK(T) Sungai Bakap, SJK(T) Serendah, and many more schools whose construction is still stalled.
Klang.
I wish to emphasise that there are still many Tamil schools throughout the country that are in a dilapidated condition and require immediate attention.
Honourable Member for Klang, may I interrupt? Thank you to the Honourable Member for Klang. Only, I heard that when
the conditions of Tamil schools are discussed, of course I would like to take this opportunity to also ask about the latest developments of Sekolah Jenis Kebangsaan (Tamil) Gopeng, which has been reported to have building damage caused by termites, and the building has been classified as unsafe. So, I request that it be inserted into the speech and included for the Deputy Minister to respond later. Thank you.
Thank you, and I request that what the Honourable Member for Gopeng said be included in my speech too. In addition, I would like to state here the matter that was raised by― earlier, our PMX stated in 2023 at a convention near Universiti Malaya in 2023 that mother tongue would be taught in secondary schools if there were 10 or more students. Until today, I do not see the ministry implementing that programme. Every year I do not forget to ask this question. Each time the answer is that they are studying and reviewing it. So, I hope this time there is a better answer. And— there is more, Madam. I was interrupted just now. So, finally, I touch on the need to devise a more effective strategy so that our teachers can focus fully on their core duties in the classroom. I understand that in fact many schools in— we see in schools, teachers are often sent to courses organised by the ministry. We also see, especially, that if in one― in a month there are 10 courses, the same teachers will attend. We see quite often that teachers are constantly burdened with courses like these, or there are teachers who like to go on courses and so on, while many teachers in the schools themselves are absent. And this shows that a teacher shortage has occurred. There is already a— the problem of teacher shortage already exists, and moreover teachers are constantly sent to courses. And we see this needs to be monitored by the ministry. The time has come, especially as we see, and hear reports, that now there is the arrangement of two teachers in one class. Certainly, in such a forward-looking thinking, but does this indicate that the government and the ministry will appoint even more teachers? Are we facing such a critical teacher shortage?
Will we appoint such a large number of teachers later, because we know that in Tamil schools, Chinese schools, and also many of those courses, what are they called, subject teachers are lacking, yes. Recruitment still faces a critical situation, but I see this matter has not been taken so seriously until today. But now we see there are two teachers in one class. It is not that I do not support it, but it must be taken into account and we must take into account the information that this matter is more serious because it consumes a large expenditure in the process.
Honourable Member, please wind up.
In, before I end― before I end, I want to explain further. The special allocation that I mentioned earlier for Tamil schools, we have never heard of it in the budget. I hope that in previous years, namely the last term such as 2022 and so on, we usually heard that special allocations were announced in the budget. This is important because when the budget states how much is allocated to Tamil schools, we can know whether it is truly used transparently. That is all, thank you.
Thank you, Honourable Member for Klang. I invite the Honourable Member for Sabak Bernam.
Assalamualaikum and good afternoon. Madam Chairman, I would like to touch on several important items under the Ministry of Education. First, Item 06200 – Sports Management. Our teachers are like candles that burn themselves to light others. They not only teach in the classroom but also become coaches, managers, drivers. Sometimes they become the main sponsors of school teams. They train students after teaching hours, bearing the cost of food and drink throughout the training. Indeed they compete at district level and beyond using their own money. They pay the registration fees with their own money. Transport costs are also with their own money. Only after the championship can they make claims. Even then the process is far too slow. Is this not a burden on teachers? They sacrifice for the nation's children, yet their kindness is not repaid in proportion to their contribution. I would like to ask the ministry whether a mechanism
will be introduced to expedite reimbursement and reduce the financial burden on teachers that they have spent, as I mentioned earlier. In addition, I would like to touch on the contributions of suppliers and security concession companies to schools, for example.
Setiu requests the floor, Sabak Bernam.
Silakan Setiu.
Yes, Setiu. I want to raise the matter of discipline teachers. Most teachers are not― most of them are not willing to become discipline teachers— [Disruption to the public address system] due to the extremely heavy workload, especially when disciplinary issues are so rampant in schools today. So, I suggest that discipline teachers be given an allowance, just as the warden allowance has been increased to RM300. And I also suggest that the warden allowance be increased to an appropriate amount. Raise it to RM500 if possible. Do you agree, Sabak Bernam?
I agree, so as to ease it.
[Bangun]
Just a moment. In addition, I would like to ask and touch on the contributions of suppliers from concession companies, for example school security, cleaning, cooked food suppliers (BMB) and so on. We are aware that there are parties who give contributions. However, we often read in the newspapers that a headmaster is investigated for misusing donation money. As the saying goes, "a drop of indigo can spoil a whole vat of milk", Chairman. Because of a greedy few, the image of the entire institution is tarnished. I would like to know how many such cases have been recorded? And what steps the ministry is taking to ensure transparency and accountability in the management of school donation funds. And most of these donations are deposited into the PIBG (Parent-Teacher Association) account, and we know the organisational structure of the PIBG is headed by the YDP (President), from among parents. Whereas the secretary and treasurer are teachers appointed as proxies of the headmaster, and the power to manage the PIBG's finances, signing cheques, requires three signatories: the YDP, the secretary and the treasurer, or two of the combination of secretary and treasurer, or the YDP and the treasurer.
That is where the laxity in financial management arises, when the headmaster directs the secretary and treasurer to sign cheques. And they simply follow the headmaster's instructions. If they do not sign, they will not get the APC. So, yes, leakage occurs. Yes, this happens a lot. But there are also headmasters who are very good. For example, in Sabak Bernam, a headmaster, Puan Hajah Sariyah Sidek. She provides sufficient financial allocation for school teams. Yes, this money is for registration, this is for petrol, this is for food and so on. Transport and so on. It is from these donation funds that they manage it, yes. And I have many old friends, this Sidek, his children are indeed good people, yes. The Honourable Minister of Education, Fadhlina Sidek, is a good Minister. I want to ask further, Item 00800 – Teachers' Quarters and School Quarters, yes. We are planning to build new schools, yes. What about the schools that have been left abandoned? Like SMK Sungai Burong, yes. A secondary school that has been simply abandoned has become a den for drug addicts, I received information, and next to it there is a graveyard and on the other side a national school, yes. Some have told of seeing, at night, what appear to be study sessions, ha. When you look, there is nobody there, yes, it turns out the ghosts are studying. If this is how ghosts become clever, people will not become clever later on.
Sila gulung.
Mr Speaker, I also wish to refer to Item 03900 – Acquisition of Education Land. I would like to draw attention to Tamil National-Type Schools (SJK(T)), especially on plantations, plantation areas such as SRJK(T) Ladang Sabak Bernam, which still do not have Ministry of Education land status, and have still not been gazetted, yes. Although this school has produced many, what is it called, professionals, such as the Honourable Member for Klang, who was also once produced from SRJK(T) Ladang Sabak Bernam.
Thank you, Honourable Member for Sabak Bernam.
Yes, Chairman. I sit down.
I invite the Honourable Member for Bukit Gelugor.
Thank you, Madam Chairman. I would like to take part in the debate on the Ministry of Education. Er, first of all I would like to touch on Item 040300, namely Curriculum Development, and also 040400 – Assessment. Does the government have plans to review and reinstate examinations such as the Primary School Achievement Test (UPSR) and the Form Three Assessment (PT3), considering the cases of bullying, killing and violence in public schools recently. Mandatory academic assessment may increase students' focus on their studies, thereby reducing their exposure to the influence of video games and social media content. And based on data from the Student Self-Development System (SSDM), cases of school bullying or violence from 2022 to 2024 have in fact increased from 6,528. Er, 3,883 in 2022. Now 2024, 7,681. And many have voiced their concern about the rise in such cases due to high-profile cases, with permission, such as the murder of Yap Shing Xuen at SMK Bandar Utama 4 recently. Malaysia stopped the Form Three examination in 2022 and the UPSR in 2021. The first question is, is there a relationship or, with permission, co-relation or causation, between the absence of examinations and the increase in cases of bullying and violence in schools? Will the ministry begin a study to determine this matter? Reintroducing examinations as before not only has the potential to improve students' academic quality but also contributes to students focusing more on their studies, which can reduce excessive screen time and online gaming, with permission, which will also reduce, with permission, exposure to harmful content among students. Studies show that there is a relationship between exposure to, with permission, aggressive online games and violence.
Although completely banning such online games is impractical, will the ministry plan to introduce other structured alternatives that will enable students to spend their time more productively, such as mandatory co-curricular activities
and programmes that will foster student discipline so as to reduce incidents of bullying and violence in future. Madam Chairman, I move on to 010300 – Infrastructure Development, 010400 – Human Resource Management. I understand that approximately RM2 billion has been allocated to upgrade about 520 dilapidated schools, especially in Sabah and Sarawak. Infrastructure improvements have certainly helped rural and interior areas. However, access challenges such as transport, internet connectivity, and the shortage of teachers have still not been fully overcome. What strategic measures will the Ministry of Education take to address these issues comprehensively? Thirdly, 040100 – Teaching and Learning Materials. A total of RM70 million has been allocated to supply smart TVs to approximately 10,800 preschools, child care centres and kindergartens to encourage digital learning literacy. This allocation covers the hardware aspect or, with permission, hardware. However, what type of software and online syllabus, with permission, online syllabus, will be used to support this learning literacy? Will it be standardised throughout the country? And what is the total budget allocation provided for its implementation? Finally, Madam Chairman, Item 010300 concerning Infrastructure Development. These are questions that have already been raised by several of my colleagues earlier regarding SJK(T), Tamil National-Type Schools. The question is what is the status of the construction of Tamil schools that are yet to be completed, including SJK(T) Sungai Bakap, Ladang Jeram and Ladang Ketumbar in Penang, Pahang and Kedah, respectively, and whether the allocation provided for building Tamil schools in Budget 2026 also covers these three schools? That is all, Madam Chairman. That is all, thank you.
Thank you, Honourable Member for Bukit Gelugor. I invite the Honourable Member for Gua Musang.
Thank you, Madam Chairman. I go straight to Item 03000 – Technical and Vocational Training. I want to touch on the issue of technical and vocational education and training because TVET
is indeed an important pillar in producing skilled manpower to meet the needs of our nation's industries. In Budget 2026, the government increased the TVET development allocation by RM54.5 million, from RM187.2 million in 2025 to RM241.6 million in 2026. This demonstrates the government's commitment to strengthening skills education in our country. However, my district, my constituency of Gua Musang, still does not have a single technical school or vocational training institution of its own. As a result, many students from rural areas have to migrate far to other districts such as Kota Bharu, Kuala Krai and Machang to obtain technical education. Somehow, given the demographics and the percentage of academic qualifications of students in Gua Musang, a TVET institution should have been built in Gua Musang long ago, especially a TVET for Orang Asli, to ensure the continuity of Orang Asli education in Gua Musang and in the bordering districts. Madam Chairman, here I present three main justifications for the establishment of at least one TVET or vocational training institution in Gua Musang. Firstly, to increase access to education for rural students. Many students in interior areas such as Gua Musang have a high interest or strong desire to learn the automotive, electrical and modern agriculture industries. However, the absence of a nearby TVET institution will certainly limit their opportunities, especially for the Orang Asli community, who find it quite difficult to travel far from the Gua Musang district, as the nearest TVET institute is more than 100 kilometres from the Gua Musang district. And the second justification is that the academic performance of students in Gua Musang or in rural areas is in fact still in the moderate category. Therefore, the government's approach of applying skills-based and practical training is very suitable for helping TVET students succeed in transforming education and subsequently transforming their socioeconomic status. Madam Chairman, next I go to Item 01000 – District Education Office Buildings. It is understood that for the construction of the Gua Musang District Education Office (PPD) building, the land has been owned for more than 10 years. But at present, and after such a long time, the Gua Musang District Education Office (PPD) is still housed in the Wisma Persekutuan building, and partly shares the site
of a school building in Gua Musang town. It is important for the ministry to expedite the construction of the Gua Musang PPD because the existing premises cannot accommodate the management needs of nearly 50 schools in the Gua Musang district. Madam Chairman, I very much hope that the Ministry of Education is ready to consider this proposal and adopt an immediate approach and action. The increase in TVET allocation of RM54.5 million should be utilised to ensure that rural areas such as Gua Musang also enjoy educational and skills opportunities on a par with other districts. Lastly, I take this opportunity to request the attention of the Ministry of Education, I ask the Ministry of Education not to rely solely on the State Economic Planning Unit in making decisions regarding educational development in Gua Musang. Although Gua Musang indeed has vast land and a geography that is easily accessible from other states such as Pahang, Perak and Terengganu, various excuses are heard to deny educational development in Gua Musang from the State Economic Planning Unit. Madam Chairman, that is all. I support the expenditure allocation of the Ministry of Education for the year 2026. Thank you.
Thank you, Honourable Member for Gua Musang. I invite the Honourable Member for Tenggara.
A'uzubillahiminassyaitonirrajim, Bismillahirrahmanirrahim. Thank you, Mr Chairman, for giving Tenggara this opportunity to debate. So, just briefly as a start regarding this 'cockatoo bird' (burung kakak tua), Tenggara, I convey greetings to the people of Tenggara, yes. Regarding this 'cockatoo bird', they all disagree when those who give views that UPSR and PMR or PT3 should be reinstated are called cockatoos. Because when I asked 10 people, 11 answered that they all want UPSR, they all want PT3, because they are worried that the SPM candidates this year are the first batch to sit the SPM without UPSR and without PT3, so I conveyed that doubt. So, I hope the ministry, the Deputy Minister is also here, may perhaps hold an engagement session. Because the era of the government knowing everything has passed, there may need to be more engagement with parents and teachers
Teachers, sincerely and honestly, on how UPSR and PT3 can be brought back. Because I see that if we want a mechanism to screen or select our children to be involved in TVET, I think from UPSR we can already screen them. So, it is like a membrane for us to know our children's inclinations. This is Item 030200 – Primary Education. Next, Mr Chairman, regarding Item 040600 – Institute of Language and Literature (Dewan Bahasa dan Pustaka). From RM68 million down to RM63 million. So, this is just a suggestion from Tenggara: it would be good if the Institute of Language and Literature (Dewan Bahasa dan Pustaka) were given a KPI to bring forth, or create, or introduce one hundred words a year as its KPI. Because we see that the Indonesian version of the Kamus Dewan is thick. So, our Kamus Dewan is already thick, but if there is a KPI, 100 words a year, create them, draft them, because slang may already be used, and certain ethnic languages can also be highlighted. Or borrow loanwords from other countries and make them into our own language. This may help to further strengthen the Malay language, the national language.
Next, 060600 – Sports Assistance and 062000 – Sports Management. All of these are going up. Earlier, another Honourable Member also touched on this, and I would also like to touch on it here, Tenggara. We often liaise with teachers. They, I will not say who, spend a lot on sports involvement. So Tenggara would like to ask: is the allocation provided sufficient to help further smooth the running of sports management in schools? Moreover, there is now Esports, and Esports also consumes quite a lot of money. And both are related to sports too. The allocation from this Ministry should ideally be channelled as much as possible to the NBOS together with the Ministry of Youth and Sports, to any premises or sports stadiums in certain districts that are commonly used by the relevant District Education Office (PPD) to hold sports days. Good for secondary schools, good for primary schools, good for our OKU children. So, collaborated within the context of the National Blue Ocean Strategy, we share to maintain or improve those premises, so that we can jointly use them for the development of sports and our children's talent in schools.
Next is Item 061800 – Student Participation at the International Level, 2.3 million. I feel the Ministry of Education (KPM) should make use of China's Belt and Road Initiative. Recently I went to Shanghai with the Honourable Deputy Prime Minister, Chairman of MTVET, Dato' Seri Dr. Haji Ahmad Zahid Hamidi, and we obtained a quota for industry sponsorship of 2,500, studying for one to six months free of charge. So, if there is an allocation for internationalisation, KPM can refer to the Chairman of MTVET to discuss the quota a little. This may save money and allow us to send many more of our students to gain exposure, especially in TVET. And last year we obtained 5,125, and this year I can say 5,000 plus 2,500. Next is 00203 – Fully Residential Schools. I only want to inform on one thing: in Johor there are 10 districts, and there are 11 education districts. Every district has a fully residential school. Batu Pahat has two, Kluang has two, Mersing has two, the others have one each. But for the Kulai education district, there is not a single fully residential school yet. So, Tenggara would like to propose— it has been applied for since the year 2000, and now it is 2025, that is 25 years. Perhaps if a fully residential school is to be built, the Sekolah Menengah Sains MADANI may be an option. Perhaps in the allocation or in Item 00203 it would be good to place Kulai as one of the destinations. The land is also available at YPJ, there is some to the south, and in the northern part of Tenggara there is a lot of KEJORA land, which may be developed. And finally, just one minute, Mr Speaker. Item 00800 – Teachers' Quarters and Education Quarters, 40.46 million. This is a serious issue because as of 2024, a total of 17,524 teachers' quarters are not occupied, and yet there is still this allocation of 40.46 million. So Tenggara would like to ask, what exactly is KPM planning and scheduling to make use of these abandoned quarters, the ones left behind? If possible, it should be discussed more seriously, so that the people's money used to build the quarters is not wasted. Coincidentally, teachers already have their own homes, and the quarters are left empty. If I look here, perhaps the Member of Parliament for Labis, if present, can confirm; there are also some in Labis, and in my area, Tenggara, there are also abandoned quarters. So, through this budget, how many new units are planned by KPM to be built in critical areas, and what is the main factor causing these quarters to be unoccupied? And what solutions can be implemented by KPM
so that there is no wastage of the people's money allocated? Because KPM's allocation is large. So if it is given to quarters, many quarters are abandoned and left empty. So if more is allocated, I fear it will be a loss to the country. That is all, Mr Chairman. Thank you, from Tenggara.
Thank you, the Honourable Member for Tenggara. I invite the Honourable Member for Pasir Salak.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and good afternoon. Madam Chairman, Pasir Salak wishes to take part under Item 020000 – Policy, Evaluation and Performance Management, particularly regarding education policy that focuses on the development of primary schools. Madam Chairman, the foundation of national education begins at the primary school level. It is here that the basic skills of 3M, reading, writing and arithmetic, are first instilled to form our children's thinking capacity, character and discipline. However, the reality is that schools in rural areas, including in the Pasir Salak area, still face challenges in ensuring that mastery of these 3M skills is truly firm among students, especially among Tahap 1 students. We do not want students who merely know how to read and write but fail to understand what they read or calculate accurately. This will have a lasting effect on their academic performance when they move up to secondary school. Therefore, Pasir Salak would like to propose that the allocation under this education policy be strengthened to expand early literacy and numeracy intervention programmes, including adding specialised teaching staff for remedial programmes in rural primary schools. Pasir Salak's question to the ministry: what is the detailed action plan to ensure that the 3M mastery programme in primary schools is truly effective and monitored on an ongoing basis, so that not a single child in rural areas is left behind in mastering this basic education? Madam Chairman, Pasir Salak would like to touch on under the project item 03504 – Education Support Infrastructure for maintenance and upgrading of rural schools. Madam Chairman, quality education is not measured only by the syllabus and examination results, but also by a safe, clean and conducive learning environment. We often hear the government's commitment
to develop inclusive and balanced education, but the reality is that school maintenance, especially in rural and interior areas, remains a major weak point in our education system. Every year hundreds of millions of ringgit are allocated for maintenance and upgrading work on schools, yet the same problems keep recurring. Project delays, poor quality of work, and weaknesses in evaluation at the implementation stage.
Setiu requests the floor from Pasir Salak.
This is not a matter of lack of funds, but a matter of governance efficiency and priorities in the use of allocations. Please proceed.
I want to raise the issue of sports facilities in schools. In Setiu, at Sekolah Kebangsaan Renek, the football field used for students' curriculum has long been damaged and may endanger and injure students who use it in the afternoon. So, what— would Pasir Salak agree if I propose that repairs to facilities like this should be expedited by the ministry? Thank you.
Alright, thank you, Setiu. Pasir Salak agrees with Setiu and will include it in Pasir Salak's speech. Madam Chairman, the first major question I want to raise: is a system for physical monitoring and audit of schools carried out periodically and transparently? Second, does the ministry have a response time mechanism, that is, a maximum period for resolving maintenance complaints so that schools are not left waiting too long? Because if there are no clear success measures or KPIs, every annual allocation will only become numbers on paper without any real impact on students and teachers. Madam Chairman, education spending is not routine expenditure. It is a long-term investment for the nation. Therefore, the government should dare to introduce a more systematic and data-based national school maintenance plan so that every ringgit spent can show a real impact on the quality of learning. Finally, Pasir Salak wishes to stress that the opposition does not reject this allocation, but we demand accountability. We want every education expenditure to be accompanied by evidence of results, not merely expenditure reports. Education is the pillar of the nation's future, and that future will only be firm if its foundation
does not leak, whether from the roof of the buildings or from financial governance. Thank you, Madam Chairman.
Thank you, the Honourable Member for Pasir Salak. I invite the Honourable Member for Rasah.
Thank you, Madam Chairman, for the opportunity given to me to take part in the Committee stage debate on the Ministry of Education this afternoon. The first matter I want to mention concerns Item 062400 – School Opening Assistance. This matter was raised by me during the policy stage, but I still have not received a reply from the ministry.
I quote the words of the Honourable Prime Minister when tabling the budget. He said that starting from 2026, assistance will be disbursed at schools through teachers to parents. This is to ensure good relations between teachers and parents for the sake of better education for our children. This sentence— I seek an explanation from the ministry. Does this sentence mean that parents must be present to receive RM150? And before that I would like to say, the RM800 million allocated is very good and very helpful to most parents in preparing for the new school session. Only, can we— I want confirmation from the ministry. Can we not use the approach of the beginning of this year, where it went directly into the account? So, what will happen if the parents do not have time to attend, will they not receive it, or will they receive it late, or how? I seek an explanation from the ministry after this. Second point, Madam Chairman, Item 060400 – Special Needs Student Allowance. It rises from RM199 million to RM269 million. I see a good increase for the special needs student allowance. I want to ask, does this increase involve the fact that students who currently receive RM150 a month will rise to RM200, or how is it? Or does the projection show that the number of students in special education will increase? I seek an explanation because the increase is 35 percent, 35 percent. So, does it indicate that more or far more students will enrol in PPKI classes, please explain.
And regarding special education, Madam Chairman, Item 01300 – Special Education under development. Last year's allocation was RM124 million. This time it is RM212 million. An increase that I myself give praise to. Credit to the Ministry of Education and the Malaysian MADANI Government because— I am among those who are called champions for strengthening PPKI education, special education. Because I know, as a father with a child in a PPKI class, I feel very strongly when there are schools whose facilities are regarded or left as second class. We must elevate PPKI to be on par with mainstream classes. So, I want to ask. Out of this RM212 million, does it mean that more PPKI classes will be opened? Okay, I request this matter. And I want to specifically mention my friend the Honourable Deputy Minister. In the Seremban District, under the Seremban District Education Office, the average PPKI class, whether secondary or primary, whether SK or SJK(C), averages 10 students or more per class. But the standard set by KPM itself is seven. In other districts, I give an example, this I state clearly for Negeri Sembilan. Tampin, Kuala Pilah, JJ, are normally seven or eight. The Seremban district is very crowded. So, I request that PPKI classes be added for the Seremban district. And regarding PPKI, I also— I believe my friend the Honourable Deputy Minister knows this very well. I will give statistics for the Seremban District. We have 63 SK, 27 have PPKI, 40 percent. SJK(C) 31 schools, only three have PPKI, 10 percent. SJK(T) 19 schools, three have PPKI, 16 percent. It is clear that SJK(C) lags behind. Although we know that in terms of building development, SJK(C) has very strong and committed PTA. But in terms of PPKI, I want to ask the ministry to look at how to increase PPKI classes. I myself am among those who strongly support it, but I need a— I hope the ministry will give an additional momentum so that more SJK(C)— because there are SJK(C) with empty classes but they are not very keen to open PPKI. If you want, I can give examples. Empty classes, surely we should not leave empty classes when they should be utilised for other purposes. So, I seek an explanation from KPM. Madam Chairman, one or two minutes additional. There are other matters. Item 060300 – Upholding Bahasa Malaysia Strengthening English (MBMMBI). I see there is RM120 million for grants. So, what is this programme?
Whether this programme has zero transition for SJKC and SJKT students is also included in this programme. I seek an explanation and details about the programme under this item. And one more matter, 02300 – Institut Aminuddin Baki. This is at Bandar Enstek, in the Rasah Parliament. I see that this institute's allocation has decreased. Last year RM35 million, this time RM25 million. Why is it less? Because this is the institute that will produce head teachers and principals who follow the NPQEL course, the National Professional Qualification for Educational Leaders. I want to give this, this is data, this is fact in Negeri Sembilan. Right now for primary schools, national schools and SJK(T), eligible candidates who already have the NPQEL Certificate are available, waiting for vacancies for placement. But in SJK(C), vacancies exist, waiting for candidates to complete and finish the NPQEL course. So, why does SJK(C) appear so very different. If possible, I want to propose that all streams must have eligible candidates who already have the certificate, and whenever there is a vacancy, fill it immediately so that no school faces a shortage of head teachers for a long period. And the last point, 30 seconds, Madam Chairman.
Please wrap up, your time is up.
Yes, 30 seconds. 00101 – Pre-school Education. I see there is RM62.5 million for this. Is this for opening PPKI classes, pre-school classes in primary schools? And does the Seremban district receive any benefit from this? That is all. Thank you for the additional time given by Madam Chairman. Thank you.
Thank you, the Honourable Member for Rasah. I invite the Honourable Member for Masjid Tanah.
Thank you, Madam Speaker. I would like to touch on Item 060600 and also 062000, namely Sports Assistance and also Sports Management. For a long time there has been confusion and also no clear statement regarding the status of the State Sports Schools, whether they are located under
under the State Education Department (JPN) or the Ministry of Education Malaysia (KPM). So, the problem that arises is that the allocation and the annual budget for the State Sports School (SSN) are the same as for ordinary daily schools, whereas the operating costs and expenditure for SSN are far higher. So, when this matter is referred to JPN, JPN says oh, SSN falls under the purview of KPM. When they go to KPM, oh, it says SSN falls under JPN. So, this matter is confusing: you cannot go there, you cannot go here. So, they are in a situation where they feel marginalised. That is why I would next like to touch on the need for an annual budget and also sports facilities. The annual budget for SSN should cover course allocations, including the purchase and also maintenance of equipment and sports infrastructure. And next, the implementation of training programmes and continuous competitions throughout the year, the provision of sufficient coaches according to type of sport, and the organisation of international programmes under student athlete development. However, when there is no specific budget, these needs have caused the schools to have to apply for donations from outside parties, and this places them in a state of stress. And next, the second point: recently we have seen at Sekolah Menengah Kebangsaan Taman Seri Jaya, which was struck by a whirlwind. Mr Speaker must have seen how those children were terrified together with their teachers, who hid in the classrooms, under the tables and so on. So, I am also very worried seeing that. So, when discussing with my friends, they said, "why not, what is wrong if the government or the ministry could hold training sessions? Not just for emergencies, fire emergency drills, but also in situations like whirlwinds." And next I would like to touch on Item 040600 – Dewan Bahasa dan Pustaka (Institute of Language and Literature, DBP). So, in strengthening the role of DBP in building unity among Malaysians, they— I extend my congratulations and thanks to DBP for having provided space for outside parties to stage their works together at the DBP Auditorium. However, I would like to ask DBP: how much expenditure has been allocated for the collaboration provided with outside parties
and how much revenue has been generated when the DBP Auditorium is rented out to outside parties? However, there is another matter I would like to bring to the attention of the Honourable Member under the topic of DBP, which is that recently, I wish to express my disappointment that there was a theatre performance at Dewan Bahasa dan Pustaka, where I and also the Honourable Member for Pagoh— coincidentally the Honourable Member for Pagoh is here. The Honourable Member for Pagoh had bought 100 tickets.
And I was also invited to watch the theatre at Dewan Bahasa dan Pustaka, but the Honourable Member for Pagoh and I were prevented from entering and watching at Dewan Bahasa dan Pustaka. Is this the MADANI Government? Are we not eligible to watch the works of local talent, especially since the Honourable Member for Pagoh knows those involved, which were specially made for the performance that night? He was very disappointed. I am also very disappointed, but I got a free ticket, while the Honourable Member for Pagoh bought a ticket. That is why, Honourable Member, I would like to get an explanation from the ministry on how this matter happened. Next I would like to touch on Item 00800, which is Teachers' Houses and Education Quarters. I wish to emphasise that the warden allowance must be increased. Wardens play an important role in ensuring discipline among students in the hostel is maintained and their welfare can be managed well. Unfortunately, wardens and teachers often experience a lack of motivation because their housing allowance is also cut due to the additional responsibility of looking after the hostel. This makes them feel under-appreciated. By increasing the warden allowance, we can ensure that wardens are responsible, enthusiastic and more focused in maintaining discipline and the welfare of our children. Next I would like to touch on Item 02000, which is the Performance Management Policy. The government, through the Ministry of Education (KPM) and the District Education Office (PPD), has emphasised the importance of maintaining the quality of students' instructional time, which is referred to as MMI, and in my hand I have the guidelines for the Implementation of Protecting Students' Instructional Time. [While showing a book] Although they emphasise the importance of maintaining the quality of our students, the reality is that teachers are in a state of distress because of high workloads. MMI time runs from 7.40 to 2.10 pm and involves various aspects. Unfortunately, many teachers feel stressed by the term MMI because the
administration often links it only to student performance, without understanding that this time also needs to be used in a balanced way for the development of character and also the students' spiritual aspects. Teachers who work hard will surely feel disappointed and eventually feel that they are less motivated. That is why I want to stress that MMI should be understood as an effort to develop students holistically and also to develop them not only academically, but also in terms of character. Lastly, Honourable Member, do you still have time?
There is no time, but I will let you wrap up.
Thank you. I want to land on Item 01700, which is the Curriculum Development Programme. I support the proposal that the government provide specific allocations for identity-building programmes in schools. Today, as we see with information technology, our children are increasingly exposed to negative culture. That is why identity-building programmes such as leadership camps, social skills courses, volunteerism and motivation camps are greatly needed in schools. In line with this, if the allocation can be increased, it would be very good for schools to organise such programmes. That is all. Masjid Tanah thanks you.
Thank you, Honourable Member for Masjid Tanah. I now invite the Honourable Member for Baram.
Thank you, Madam Chairman, for this opportunity. I would like to begin my speech, the debate this afternoon, by thanking the government for having approved an allocation that is so large, the largest for the Ministry of Education. We believe that with this allocation, in the near future or in the time to come, our country will have a excellent and competitive human capital. I would like to refer to one or two matters, namely Item 03700, which concerns the Rural Development Programme for Sabah and Sarawak valued at 745 million. This concerns programmes in rural areas, and I would like to ask the Ministry of Education what plans the ministry has to ensure that in the near future all dilapidated schools and
quarters for the– for teachers in interior areas can be resolved. We know that in this House, this House always says that one of our purposes is to ensure that education is given priority and that existing infrastructure must be competitive and robust. I ask that, alongside giving emphasis to dilapidated schools and building new schools, teachers' residences must also be prioritised. Because I believe, and in my constituency especially in rural areas, in Baram, I have been informed that there are 41 schools in the Baram area that need quarters that must be repaired. And I have been informed that there are 675 quarters that need repairs. I request that this matter be taken seriously, and this includes schools such as SMK Marudi, SMK Long Lama, SMK Long San, SMK Long Bedian and dozens more primary schools in interior areas. Second, what I wish to touch on is Items 060000 and also 061100, which concern sports assistance and also hostel transport and travel. I would like to say here that in interior schools, with regard to sports assistance or this travel, they really face financial problems that are very worrying. Because they– because the school must take these students to towns such as Marudi, Long Lama and Beluru to take part in these sports activities. I would like to request an explanation from the ministry on the method or SOP used to distribute the existing allocation. I am sure the existing allocation is really insufficient, and I appeal to the ministry to use a method that considers not only the number of students, but we must also look at the distance of these schools from the places where sports activities or the facilities for students of these schools are carried out. I ask that schools in the interior be given allocations or be given more assistance than they usually receive. I believe this will further improve the quality of our education, because we know that in
rural areas, there are B40 people who are poor, and education is one of the channels that can develop or help us end poverty in rural areas. Therefore, I thank Madam Speaker for this opportunity and request that the ministry take this matter seriously and resolve it promptly. That is all, thank you.
Thank you, Honourable Member for Baram. I now invite the Honourable Member for Kulim-Bandar Baharu.
Yes, assalamualaikum and salam sejahtera. Thank you to Madam Chairman for giving me the opportunity also to debate in the Committee, at the Committee stage of the Ministry of Education, which is the only ministry that receives the highest allocation in Budget 2026. The first issue is Item 00204, which is Matriculation.
The issue of relevance and also equivalence between the matriculation programme and STPM is often a topic of debate, particularly in the context of admission to public universities in Malaysia. The question is, what is the ministry's assurance that the matriculation system remains relevant and equivalent to STPM and continues to be accepted as a requirement for admission to public universities? For the next item, which is Item 00800 concerning teachers' houses and also education quarters, where the allocation of RM36 million in 2025 increases to RM40 million in 2026 for the budget tabled. I request an explanation from the ministry: what are the plans to repair the– the dilapidated teachers' quarters, for example in the Kulim-Bandar Baharu parliamentary seat. Not only dilapidated and damaged, but even burnt. Will they be repaired or will they be left without any plan for repair? Madam Chairman, for quarters that are still not occupied or are left vacant, possibly due to strategic location, overlapping eligibility and placement policy, does the ministry intend to plan for them to be used by other agencies or departments instead of remaining vacant and unoccupied? For Item 03900 – Acquisition of Education Land, where in 2026 the budget is RM41 million. Madam Chairman, the issue of schools without
fields is a serious problem that can affect the holistic development of students, especially in terms of health, physical aspects, character building and also social development. In the context of national education, fields are not only places for recreation but are also part of the basic infrastructure that supports the implementation of the physical education curriculum and co-curriculum, where these two components are compulsory in the Malaysian schooling system. Therefore, I request from the ministry: what are the plans to overcome the issue of schools that still do not have school fields to complete the education process in schools? Some examples of schools in my Parliament, for instance SK Lubok Buntar and also SK Sungai Kechil Ilir, are among those most affected by not having these fields, and many more schools in my Parliament still do not have fields for co-curricular activities. For Item 03503 – Alteration, Upgrading of Educational Institutes. Madam Chairman, in this item I would like to propose that the issue of coordination of colours and paint standards for schools deserves special attention. In my view, the need for coordinated school paint symbolises national identity and a professional image, where schools are a symbol of the national education system. From the psychological and learning perspective, harmonious and soft colours can increase students' focus and create a conducive atmosphere, different from dull or overly dark colours. Now, school paint colours are varied; some are attractive, while others diminish the splendour of the school. Perhaps we could coordinate the paint for primary schools and also secondary schools. Colour plays a major role in emotion and focus. For primary schools, the colours should be soft to help create a friendly and happy atmosphere suitable for the age of the children. For secondary schools, the colours should be more neutral and mature, giving a serious and professional image suitable for the teenage phase. I ask the ministry to give attention to schools, because schools have various colours. It is quite difficult for us to give an attractive picture of the school institution. For Item 00203, which is the Fully Residential Secondary School. I also request from the Ministry of Education that attention be given to districts that do not have fully residential schools, namely the Bandar Baharu district in
the Kulim-Bandar Baharu parliamentary seat, where this district is suitable if we build a school, because it is a rather remote rural area, and if there were a fully residential school, it could possibly raise the economic status of that area. That is all, thank you.
Thank you, Honourable Member for Kulim-Bandar Baharu. I now invite the Honourable Member for Sungai Petani.
Thank you, Madam Chairman. The Ministry of Education receives the largest allocation compared with other ministries, namely RM66.2 billion in 2026, compared with RM64.2 billion in 2025. Madam Chairman, I would like to record my appreciation to the Most Honourable Prime Minister and the Honourable Minister of Education for the continuity of policies based on human reform. This is in line with the philosophy that education is not merely about producing a workforce, but about building citizens who think critically, have good character and have big hearts. Madam Chairman, I would like to touch on Item 00201 – Academic Secondary and Item 00102 – Academic Primary. The government has allocated around RM840 million for secondary education and RM1.03 billion for primary education, which is a significant increase compared with the previous year. I wish to record my appreciation to the ministry and the Honourable Member for Tambun for approving, among the 38 schools to be built next year, one located in the Sungai Petani parliamentary seat, namely SMK Seri Pinang, and this brings relief to the residents nearby, and I thank them very much. However, at the same time, we also want to see that there are still many schools that need attention: dilapidated schools and schools that need infrastructure upgrading. As an example, in my own area in the town centre, in the town of SK Bakar Arang for instance, there is still much infrastructure that needs to be reviewed. For example, the fans in the classrooms are very old, not replaced for decades. When requested, they have to wait their turn and so on. So, this is what needs to be looked at. Apart from the many schools, we also want to look at how these schools can get better and more comfortable infrastructure. Mr Speaker, therefore I propose that there be established
a school maintenance fund based on need, or needs-based maintenance fund, so that allocations are distributed according to the actual level of obsolescence of schools. Madam Chairman, I would like to touch on Item 061400 – Preschool Food Assistance. The government has allocated about RM138 million to expand access to preschool, including the construction of 350 new preschool classrooms and the provision of smart TVs for more than 10,000 preschool classrooms, and this I fully support. Madam Chairman, I would like to touch on Item 050300 – Leadership Training. We see that across Malaysia there are 10,220 schools and 2,440 secondary schools. This means that every year we can produce 2,440 leaders, because every school will have a head prefect or head of student council and so on. But where is it that every year we lose at least 2,440 of these leaders? That is why we need a leadership policy to train our schoolchildren, our pupils, to become good leaders, and this must not only be at school but must also be continued. As an example right now, there is the AKM – Malaysian Academy of Statecraft (Akademi Kenegaraan Malaysia), there is the Parliamentary School (Sekolah Parlimen) programme run by the Parliament of Malaysia, there is the PLKN programme, and this is what the ministry should look at, how we can produce 2,440 heads or leaders every year, because this is what we lose every year. Mr Speaker, I also want to touch on the issue— I would like to propose that a digital emotional literacy and digital ethics programme be introduced in schools. Why? Because nowadays there are many cases of bullying, criminal cases, rape and so on. All of this starts from digital, starts from our handphones, how there is no boundary for us to access various websites and so on. And nowadays there are many dark web sites and so on that can be accessed by pupils, and we see from studies, we see that inside our body we have a central nervous system, there is grey matter and white matter. This grey matter has neuron somas.
In one study, it was shown that when the brain is scanned, people who watch more pornography, this causes their grey matter to shrink more, and we see that in their reward centre, it is higher. So, to reach that threshold, they need more, more and more. If we look at
people addicted to drugs, addicted to cocaine, syabu and so on, we can see that. But how our children are being fed pornography, fed with bad elements, causing damage to the brain itself, and this is what schools need to look at, how we want to make a good education plan. Lastly, I would also like to touch on the Malaysia Education Development Plan 2013-2025, which will end on 31 December 2025. I would like to ask, what is the latest status of the comprehensive evaluation report on the plan? And how can the government state the successes achieved during that period and the failures that occurred during that period? With the presence of COVID-19 and so on. And how will the government use these successes and failures to form a better, greater Malaysian education development plan to produce a more solid and great future generation? In line with what the government wants to produce today, namely the MADANI generation. That is all, thank you Madam Chairman. Sungai Petani requests support.
Thank you, Honourable Sungai Petani. I invite Honourable Kapar.
Bismillahirrahmanirrahim. Thank you to Madam Chairman. Thank you for giving Kapar the opportunity to debate the 2026 Budget of the Ministry of Education (KPM) at the committee stage. I refer to B.63, Item 010300 – Infrastructure Development, RM23,304,300. According to the function set by the KPM itself in this Estimates book, this thick one [Holding up the Federal Estimates 2026 book] is to develop complete and quality education infrastructure. So, Kapar wants to know the date for the SK Telok Kapas project, when will it start? And the most crowded school in Malaysia with 4,300 pupils, namely SMK Meru, when will the signboard for this project be erected? Or just tell us, Honourable Deputy Minister, when will the rakyat of Kapar, who are waiting, see a second SMK Meru or whatever it is, be built? If we follow this DOSM book [Holding up a copy] statistics for 2023, this is specific to Kapar. Regarding education in 2021, these are its statistics. There are 29 primary schools in Kapar. Only 13 secondary schools. There are
320,000 residents in Kapar, and while others are ageing, in Kapar 40 percent of those 320,000 are young people. Young people, meaning they have young children, who need schools. So, please— I was also jealous hearing earlier, some of my friends over there got new schools. I ask that this problem be ended. If not, I will have to raise it, bring it up often here. Item 010500 – Information Technology. Mr Chairman, I rise today not merely to carry the voice of Kapar but the voice of thousands of pupils and teachers trapped in fear within a system that has not adequately protected them. The budget is not merely numbers. It is a reflection of our values and our ability to defend the weak and those who cannot speak up. The core issue is bullying and hidden misconduct. Statistics show that physical, emotional and cyber bullying cases are increasing. Teachers, meanwhile, face pressure, harassment and administrative misconduct that is difficult to report. Many victims choose to stay silent because they fear being ostracised, punished and not believed. I urge that the Ministry of Education's budget allocate a special fund specifically to develop and expand an anonymous complaints application. Right now there is a complaints portal but it is not anonymous. They are afraid to use it. It must be pupil-friendly, teacher-friendly, easy to use, multilingual and accessible via smartphone and go directly to the higher authorities. Complaints must not be blocked by internal bureaucracy. Protected by law, the identity of complainants is guaranteed and retaliation is prohibited, supported by psycho-social intervention, counselling, monitoring and support after complaints. And how many CCTVs— this morning you said 200 in religious schools– – boarding schools. I want to know in Kapar here, the one I said is crowded just now, how many, Minister? Referring to Item 040300 – Curriculum Development, under strengthening education operations, RM49,984,300. I see many of our pupils are not skilled at managing finances. Some spend money but do not know how to budget. So, I propose that there should be financial literacy, emotional intelligence, social intelligence. All these need to be considered for inclusion in co-curriculum activities. So, let pupils not be caught up in debt and— yes, influenced by others, only then will they want to do something. A little more, Chairman. I would also like to mention here, teachers today are not merely teaching, yes. They are burdened with various administrative tasks
that have nothing to do with their core duties. According to the Report of the Malaysian Teachers' Union, more than 60 percent of teachers admit to experiencing chronic stress, and the main causes are documentation burdens, layered assessments and pressure to comply with various rules and directives that change frequently. The ministry needs to re-evaluate internal policies and procedures that are too strict and bureaucratic. We do not want our education system to become a form factory. Forms, forms, forms, forms. What we want is for schools to be places where teachers are creative and pupils are happy to learn at that school. So, I propose three concrete steps. First, reduce non-teaching tasks. Appoint special administrative officers at schools for documentation and reporting. Two, establish a national teacher wellbeing index to monitor the level of stress and job satisfaction of teachers every year so that education policy is anchored in the realities of the classroom. Loosen the PDPC rules. Give teachers autonomy to plan learning approaches that suit the level and needs of pupils. The quality of education cannot be measured only through data and system reports but through the spirit and wellbeing of teachers, who are the lifeblood of schools. If teachers continue to be burdened and restricted, we are sowing the seeds of exhaustion and lethargy in the national education system. Finally, Madam Chairman...
Time is up, time is up. Thank you, Honourable Kapar. I invite Honourable Sri Gading.
Oh dear, you won't give more, will you?
Sudah lebih.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Madam Chairman. Sri Gading would like to debate several items. Among the most important matters, first of all to express the wishes of the rakyat of Sri Gading, particularly in Pekan Parit Yaani, because this school has been built since 2013, Sekolah Menengah Kebangsaan Suria Jaya. Until today, not a single pupil has been able to enter it because it is still delayed. What Sri Gading wants to state here is that the experience of delays in school development must be taken into attention by the ministry
so that it does not happen again. Because I am confident and believe the issues raised from the beginning, identified as contractor problems, but when studies and so on were added, various problems arose. And Parit Yaani very much hopes that the rakyat who have been waiting nearly 13 years for this secondary school to be implemented can have it done next year. Item 062200 – Transformation Schools, where the allocation appears to remain at RM7.5 million. The purpose of this allocation is to form morals, civilisational values, positive behaviour, character building, courtesy, discipline and identity among pupils. What we— Sri Gading wants to state here is that if this allocation is expanded, not only to certain schools but to the whole country, to schools or schools that are deemed to need focus.
Because we are well aware that the issue today is related to moral decay among children in schools, not only outside but inside schools too they have done things beyond our sane understanding. So, what needs to be done is that pupils must be more aware of their environment, so that programmes can be implemented ensuring that the groups of student leaders among these pupils are given exposure, an approach, a course so that they have the self-confidence to provide leadership or lead their peers so that they can become idols among their friends. From there, we can save at least those pupils who may be problematic. Because this is important to ensure that problems of bullying, fights, racism can be fixed or resolved, because why? Because there are peer groups, their peer group who can become idols based on the transformation schools founded in— for the formation of noble values or manners and morals. The next item is 00300 – TVET Education. As we are well aware, in today's situation, TVET, maybe ten years ago or five years ago, we still used vehicles with engines, what are called diesel or petrol. But today, usage is EVs, that is batteries. Does the government allocate to these TVET or vocational schools equipment that is
new and more forward-looking for them to be exposed to, so that by themselves they have the knowledge to face problems or situations of that nature. Where here too, if we look, train-to-hire needs to be carried out, namely where TVET is trained together with industry so that when they are involved with industry, once they finish the course, once they finish the training, they can be absorbed directly. If this can be implemented with industry as a training, it is a very good thing. Third, do we see how TVET is in agriculture? Has it been mentioned, is TVET linked with agriculture? Because we are well aware that agriculture is also a source of business, a source of food, important for the country. If there is no food, no agriculture, how can we generate a better life? And this is also a source of income for the rakyat. Therefore, Sri Gading proposes that TVET not only covers the motor industry, that kind of industry, but also the agricultural industry in related fields. Finally, regarding the budget...
Sila gulung.
...or regarding 060900 – Supplementary Food Programme. The allocation that remains RM869 million. Where Sri Gading wants to ask, to get an explanation from the ministry, what menu is provided? Because we are well aware that sometimes the menu provided is suitable for children's development? Because we are well aware that stunting or stunted children, then naturally their thinking, their achievement is also stunted in academics. So, I hope that it can be brought forward to specific programmes, for example, take one portion of a PPD, say we want to develop it as an example, then it can be managed in each PPD. That is all, thank you. Sri Gading supports.
Thank you, Honourable Sri Gading. I invite Honourable Temerloh.
Assalamualaikum and peace be upon you. Thank you, Mr Chairman. Temerloh wishes to focus attention on several important items that have a direct impact on the quality of education in this country. 040100 – Teaching and Learning Materials. Mr Chairman, I would like to draw attention to the fact that the allocation for this item has increased by 7.74 percent. First, what is the basis of this increase? Is it due to the expansion of digital materials, increased market prices or merely ordinary adjustment without quality improvement? Second, to what extent does the ministry ensure that this increase also benefits schools in rural and interior areas that are still struggling with a shortage of teaching materials and Internet access? And third, is there a monitoring system implemented to avoid waste such as purchases of PdP materials that are not used by teachers in schools. 040300 – Curriculum Development. For this item, Mr Chairman, we see the allocation decreasing by a reduction of 0.58 percent. Although it is small, the question is, why does this reduction occur at a time when the national education system is going through an important phase of transformation? We are talking about the need to update the curriculum post-pandemic, strengthen STEM, introduce elements of artificial intelligence AI into the curriculum, form quality individuals, and align learning content with current job market needs. What about the Islamic education and tahfiz curriculum that is mentioned as part of the National Education Policy? Is it also given proper attention? What efforts are being made to develop the souls of pupils who are virtuous, courteous and faithful, for a generation that is not only knowledgeable but far from various social problems. Is it enough with character education subjects? How is it assessed? 050100 – Pre-Service Training and In-Service Training. Mr Chairman, I want to express concern over the reduction in teacher training allocation under this professional development item. Teachers are the lifeblood of the education system. If pre-service and in-service training is reduced, how can teachers improve their skills
facing rapid changes in digital education and 21st-century pedagogy? [Mr Speaker chaired the Committee] Why is the government taking the step of reducing this allocation at a time when teachers urgently need additional training in the use of integrated AI technology and new approaches in the classroom, especially to deal with the various behaviours of today's generation of students? We are concerned that this reduction will have a direct impact on the quality of teaching and on teachers' motivation across the country. Likewise, there is the issue recently raised about two teachers teaching one class at the same time. Have teachers been trained and exposed to the teaching technique of one class with two teachers for effective pedagogy? To what extent has this method been studied and has it produced a positive impact on the students involved at all levels? 001000 – Pre-school Education. As for the details of pre-school education, the allocation has increased by 49.39 per cent, almost 50 per cent. What are the main components contributing to this near-doubling of the increase? Is it for the construction of new pre-schools, an increase in pre-school teachers' allowances, or the improvement of early childhood curriculum? I also wish to ask whether tahfiz pre-schools are also enjoying the benefits of this increase. We are well aware that more and more parents are choosing the pre-school approach as the foundation for forming their children's character. Therefore, the government must ensure that tahfiz pre-school programmes under the supervision of KPM are given the same standards and support as mainstream pre-schools. 00800 – Teachers' Houses and Education Quarters. This is a positive development. However, I would like to ask whether this increase is used for new construction, maintenance of existing quarters, or merely to cover rising maintenance costs? Many teachers, especially in rural and interior areas of Sabah and Sarawak, still have to live in rented houses and share unsuitable accommodation. What is the government's comprehensive plan to ensure teachers' houses are built according to actual needs? How many new teacher quarters are there and where are they being built? Temerloh would like to know how many teacher quarters are vacant and unoccupied for several reasons. What efforts have been made for the vacant teacher quarters in Temerloh and the many other quarters that lie vacant elsewhere?
One more, just a little. Why are these quarters not being utilised for members of the public or the B40 group who cannot afford to buy a house?
Item 01300 – Special Education. Temerloh requests attention for Sekolah Menengah Temerloh Jaya, which needs a new basic bakery workshop for PKI students. Number of students: 30. The workshop conditions are cramped and uncomfortable, hot, and the workshop is not suitable for PPKI learning activities. I request that the ministry take note for the sake of welfare and for the sake of effective learning. In closing, Mr Chairman, we do not want to see this large allocation ultimately not reaching its real targets ― teachers, pupils and schools ― which are the backbone of the nation's progress. The Ministry of Education plays a very important role in producing a generation able to face various challenges and possessing a firm identity, one that is not easily swayed by negative things that harm the future of themselves, society and the nation. Thank you.
Good. Next, I invite Pokok Sena.
Assalamualaikum and good day. Tan Sri Chairman, I refer to Item 040300 – Curriculum Development. Lately, we have been bombarded with various issues. Among them, firstly, moral decay involving schools. Pokok Sena is of the view that we should refine the curriculum approach for today's students in a more comprehensive manner. To what extent is the appreciation of religious and moral learning being given emphasis in order to regulate the conduct of a student? This is something that should be re-evaluated fairly. The second issue concerns safe schools. It is also a concern for all of us when elements formed outside school are brought into school. The murder of a student, for example, at a school in Bandar Utama recently must be assessed seriously, and we earnestly hope for controls so that such incidents do not happen again. Therefore, the safe schools policy must be formulated by examining the critical issues that have arisen. Thirdly, the ministry has raised the framework against school bullying. However, the question is, what substantive intervention is there in introducing that framework
to address bullying cases? If it is not explained well, it will cause the confidence of teachers and parents in the safety of students at school to continue to erode. Item 03503 – Alteration, Upgrading of Educational Institutions and Item 04001 – Scholarship and Sponsorship Programmes. Tan Sri Chairman, both these items are new listings, allocated RM930 million and RM488.7 million respectively. I request that both these items be detailed so that we can know the meaning of the allocation under development expenditure on human capital and infrastructure under both the items mentioned. Item 020100 – Education Policy. Issue relating to the directive limiting teacher involvement in programmes and activities outside school. Tan Sri Chairman, I would like to draw the attention of this honourable House to a matter that is increasingly becoming a heated topic among educators, namely the directive limiting teacher involvement in any programme or activity outside school, as reported on 12 September 2025 recently. The directive states that teachers are no longer permitted to leave the school premises on working days, namely Monday to Friday, and all sports, curriculum, co-curriculum activities and outside meetings must be conducted on Saturdays and Sundays. The rationale, according to the Director General of Education, is that this step aims to reduce teachers' workload and ensure teachers' time at school is sufficient to smoothly carry out the teaching and learning process. However, the actual implications at the grassroots level are very worrying. The action of shifting all activities to the weekend has disrupted the balance of working and rest time for teachers and students. Teachers and students now lose time with their families, whereas the weekend should be a time for rest and mental recovery. From a logistical standpoint, the cost of organising activities on Saturdays and Sundays has increased, including expenses for transport, food and drink, and support manpower. Moreover, sports under the Malaysian School Sports Council (MSSM) and hundreds of activities outside the calendar are now at risk of being disrupted because the schedule has become too crowded and overlapping. So, I request an explanation from the ministry. Thank you, Tan Sri Chairman... [Applause]
Good. I invite Selangau.
Thank you, Tan Sri Chairman. The estimated KPM development expenditure for 2026 shows that KPM still holds the largest development allocation portfolio, amounting to RM6.314 billion. Under Item P 03900 – Acquisition of Education Land, the 42 per cent reduction in Item 03900 in 2026 is very worrying. The drastic cut in land acquisition allocation, in line with the overall decline in development asset expenditure, could delay long-term education planning in Sarawak. Selangau requests the Minister to consider relocating SK Nanga Kua and SK Nanga Selangau to a new, safer site, because the existing site faces severe flood risk every year and causes property damage. However, the proposal is for a full replacement of SK Nanga Selangau to be built on the existing SMK Selangau development site, which is shared and only requires an NOC ― notice of change, with permission. Tan Sri Chairman, Item P 05100 – Furniture and Equipment increased from RM1 million in 2025 (revised estimate) to RM150.8 million in 2026. History records that in 2012, pre-school pupils at SK Nanga Selangau once had to study on the floor because the supply of equipment was delayed even though the school session had started. In addition, Selangau demands that a specific amount be allocated under P.05100 for SK Penghulu Tayai, SK Nanga Tau, SK Nanga Selangau and SK Nanga Kua for replacing damaged furniture, fittings and computers in those schools caused by floods. Selangau also wishes to propose that the Minister consider an allocation for the purchase of smart boards or smart TVs under Item P.01800 – Education Resources and Technology. This is important to ensure children in Selangau do not continue to fall behind in the era of digital learning. Children in rural areas are still learning through conventional methods because of a lack of smart equipment, whereas students in urban areas already enjoy interactive facilities.
This step will help bridge the digital education divide between urban and rural areas. Tan Sri Chairman, I next refer to the item
P.03700, namely the Sabah and Sarawak Rural Development Programme, dilapidated schools. Although the allocation is high, delays in implementation remain a major issue. Selangau demands that KPM give an assurance that the redevelopment projects for dilapidated schools in the Selangau Parliamentary constituency that are still in the pre-construction or construction phase will fully utilise the IBS – Integrated Building System method, with permission. Next, Selangau also draws KPM's attention to the persistent water problem at SMK Ulu Balingian, which requires a water pump from Sungai Tepus. The existing pump is frequently broken and the maintenance allocation is also limited, causing it to be unable to be maintained and affecting the needs of the children at SMK Ulu Balingian. The school is also unable to pay the wages of the workers and the pump attendant because no specific allocation has been provided. Item 00800 must cover the cost of disaster recovery and the solution to operational utility issues. Given that this allocation has increased slightly, how does KPM plan to rehabilitate the quarters that have been affected by natural disasters such as floods in Nanga Kua, SK Nanga Selangau, SK Kuala Muput, SK Nanga Tau, and whether Item 00800 also covers allocations to resolve basic utility issues such as installing separate electricity meters in 10 schools in PPD Selangau? Next, Item P. 04600 for the School Computerisation System and Education Institutes. The increase in allocation to RM416.4 million is key to bridging the digital divide. However, in the interior areas of Selangau, the main issue faced is the critical shortage of ICT equipment or hardware in schools. In fact, some classes do not have Internet connections, and there is a lack of physical assets, and this prevents teachers from implementing effective digital teaching. Selangau demands that KPM provide details of this allocation under this item and ensure part of the funds is allocated for the procurement of ICT assets for PPD Selangau. It is proposed that KPM set a Key Performance Indicator or KPI for the student-to-device ratio in rural schools by the end of 2026. With effective implementation and transparent monitoring, the benefits of this development will continue to be felt by children in rural areas. Selangau is optimistic that 2026 expenditure will become a catalyst towards a more inclusive and quality rural education. Thank you, Tan Sri Chairman.
Good, thank you. I invite Pengkalan Chepa.
Bismillahirrahmanirrahim. Thank you, Tan Sri Chairman. There are four main points based on voices from the field. Firstly, I would like to touch on Item 030000 – Education Operations. Co-teaching 2027 and also the implications for teachers' workload. I have no problem supporting two teachers for one class. There are many benefits and goodness in it. However, the questions that arise are its effectiveness and the workload that must be answered. Reports in Sarawak show concerns that co-teaching requires careful planning and coordination, whereas the teacher shortage has not been resolved. KGGMB — KGMMB demands an audit of the number of teachers before expanding implementation. The implementation mechanism to the public is still at an unclear stage. So, implement a pilot project for— and transparent reports and comprehensive training, involve unions and also experts for monitoring. Along with that, add teaching assistants for non-teaching tasks so that teachers' focus is only on PdP, and I request that the expansion phase be explained. For example, the year, level, subject, and the needs for human resources and also infrastructure. 01700 – Curriculum Development, namely upholding Jawi. KPM states it is committed to strengthening Jawi in the 2027 curriculum. But immediate action is needed because the Jawi component has been dropped from the SPM, namely the subject of Islamic Education, and this has broken the continuity of practical learning that should exist. So, I propose that if we are to uphold Jawi, the Semarak Jawi activities and the like must continue, and restore the Jawi questions or marks in the SPM for related subjects, train teachers, cooperate with DBP (Dewan Bahasa dan Pustaka), enhancement courses, and also revive the ecosystem of Jawi Day, Jawi-script textbooks, calligraphy clubs, khat and calligraphy and so on. A more inclusive approach emphasises that Jawi is not only heritage and not only national identity, but sometimes it becomes a political controversy that is attempted to be played with. 00800 – Teachers' Quarters and Quarters in the interior of Sabah and Sarawak. The field reality is that many quarters are dilapidated and derelict. In fact, there are teachers living in storerooms, as reported by the media at one time. STU states that this problem has dragged on for decades. Data for 2024 show 17,524 out of 47,855 quarters are vacant,
some are damaged, and the locations are unsuitable. The existing allocation, approved in 2024, is RM66.5 million. There is, but the scale is still far bigger than the allocation provided. And, for 060000, the specific programme MySTEP teaching assistants. Since 2023, MySTEP has placed 548 to 564 teaching assistants in about 282 large schools. The initial impact is positive: non-teaching load has decreased, and focus on PdP has increased. However, the scope is only concentrated on large secondary schools. Interior primary schools also very much need MySTEP as these teaching assistants. The scale below 3 per cent of 10,000 schools is too small, which must be re-evaluated and examined by the government. And, the short-term contract status undermines stability and should be studied for permanent positions for teaching assistants. Duties, administer duties. Ensure the scope is clear, data, PdP materials, monitoring, avoid misuse, so that they do not merely become workers doing photocopying. In connection with the early implementation of teachers, roughly 12,000 from 2022 to 2023 show the urgent need to reduce workload. Expand MySTEP with clear targets and conduct an official impact study on PdP, teachers' stress, and also use the evidence to relax position restrictions or establish a permanent scheme. Mr Speaker, finally I want to mention, teachers must be freed from administrative tasks, freed— teachers must be freed to teach, not to become clerks, not to live in dilapidated quarters, and not to bear policies without careful implementation. I support improvements, but I demand timelines, targets and concrete impact reports from KPM. Teachers who drive the nation's education transformation will only be meaningful if teachers' well-being is truly safeguarded. Thank you, assalamualaikum warahmatullahi wabarakatuh.
Good. I invite Miri.
Thank you Tan Sri, for the opportunity given. I refer to Head B.63, Item 030400 – Post-Secondary Education. Allow me to begin with the words of the 36th President of the United States, Lyndon B. Johnson.
"Poverty should not be allowed to hinder education, and education must be the way out of poverty." We gratefully acknowledge the first part of that statement. Primary and secondary education in our country has already succeeded in reaching universal coverage. However, in today's times, primary and secondary education alone is no longer sufficient to be a way out of poverty. That pathway now lies in post-secondary education. So the question that weighs heavily on the hearts of many families is whether poverty will become a barrier after the SPM. The answer is all too often, yes. The pre-university pathways that exist today largely favour those who are wealthy or those who are selected. A-level and foundation programmes at IPTS require financial means. For government pre-university programmes such as matriculation and asasi, only the brightest or the selected are needed. Many children want to enter but are not necessarily able to. Amid the dangerous doors and the limited, selective doors, there remains one people's door that is the only hope for all the people who wish to change their fortunes through education, namely the STPM. We are fortunate that Malaysia still maintains a universal pathway open to everyone to enter IPTA through the STPM. For an ordinary child from an ordinary family, especially children of poor families in rural areas or children who grow up in urban squatter settlements, the STPM is often the only path to change the fortunes of themselves and their families, to escape poverty, and to pursue dreams like their peers. For this reason, the government must give extraordinary attention and support to the STPM so that we can truly build a society founded on justice and equality. Tan Sri Yang di-Pertua, allow me to touch on the issue of time justice, which is an issue that is often overlooked but is very burdensome for low-income families. The STPM cycle today is far too long. After the SPM, students must wait about six months for the results and for admission to Form 6, and the STPM study period is a full one year and six months. Then they wait a further six to nine months for results and admission to IPTA. Overall, from the end of the SPM to entering IPTA is about two years and nine months, nearly three years. By contrast, for the A-level, foundation, asasi or matriculation pathways, the period from SPM to university is typically about one year and nine months, which is shorter
one year compared with the STPM. One additional year without income is a heavy burden, especially for poor families. Therefore I propose a specific reform to align the STPM timeline with that of the A-level, which is indeed equivalent to the STPM level. This would involve allowing early entry into Form 6 immediately after the SPM examination, based on provisional results with automatic confirmation after the official results. We could also redesign the STPM calendar so that it ends earlier, allowing STPM graduates to enter IPTA directly in the September intake of the following year, in line with their matriculation and asasi counterparts. Next, I refer to Item 040400 – Assessment and Item 040500 – Malaysian Examinations Council. Every year we hear complaints from STPM students who do not get a place or do not get any of the choices they filled in. To ensure transparency, fairness and quality, my proposal is to establish a universal assessment or examination across pre-university programmes, particularly the STPM and matriculation, as a standard component that supports merit. With a uniform measure, this can facilitate precise placement and restore public confidence that our system is truly fair. Finally, I refer to Item 061900 – Pre-University Allowance. If the Ministry of Education (KPM) can provide living costs for matriculation and the IPG, then STPM students should likewise receive equivalent support. Last year there were discussions on providing a monthly living allowance for Form 6 students. I would like to ask the ministry about the current status of that policy, because this modest contribution can make the difference between continuing studies or dropping out to support the family. Finally, Tan Sri Yang di-Pertua, the core of our struggle is simple. Regardless of whose child they are or where they come from, every child should have a fair opportunity to go to university and to improve their standard of living. Education is not merely a ticket to the lecture hall, but a staircase out of poverty, a pillar of family dignity and a hope for a fairer nation. That is all from me. Miri, I humbly request your support
Thank you. I invite Maran. Please proceed.
Thank you, Tan Sri Chairman. Allow me to debate the budget of the Ministry of Education (KPM) at the Committee stage. There are several matters I wish to raise, the first of which is
item 030000 – Education Operations. I want to address the growing concern among teachers about the safety of teachers from lawsuits, complaints or excessive pressure from parents. Recently, a case went viral of a teacher who merely shared a photo of 18 students who had not completed their assignment in a parents' WhatsApp group, with the intention of informing them and involving them in their children's educational responsibilities. However, that action was reported through SISPAA as though the teachers had committed a disciplinary offence and public exposure. Incidents like this send a dangerous signal. Teachers are increasingly afraid to educate. They are no longer free to reprimand or advise because they fear being reported, investigated and even sued. Over time, the one who will lose out is the student, because there will be no more courage to educate firmly and on principle. In the past, Tan Sri Yang di-Pertua, parents gave teachers permission to discipline their children, with the rotan allowed so long as it did not cause wounds, fractures or bruises. Even when the child came home, if the child had done wrong, the father would wait with the rotan too. That is why in the past we could raise children to be good and respectful towards their parents. If a child does wrong, today they cannot be disciplined any more. Do not blame the teacher if our children do not become useful members of society. My question is, what policies and mechanisms does the Ministry of Education have to protect teachers who carry out their duties professionally from being burdened with complaints or unwarranted legal action by parents, including considering the introduction of a teacher protection policy, with permission or special guidelines to balance the rights of parents and the rights of teachers as educators. Tan Sri Chairman, under the same item I wish to raise a matter of great concern, namely the government's action in openly permitting political activity in schools. Recently, a state government Exco member went viral on social media for using an official school programme as a platform to promote a political party and recruit new members. This is a clear violation of the principles of neutrality, public service and the integrity of education. Even more worrying, at the same time, opposition representatives continue to be prevented from carrying out programmes such as student motivation and community contributions.
Tan Sri Chairman, do not blame us if we wish to enter schools to help educate all our children but are prevented from doing so. In the end we produce children who deeply disappoint the whole of society, religion, race and the nation. If this matter is not addressed firmly, schools will lose their dignity as zones of knowledge free from political influence. My question is, what action will the ministry take against the State Education Department (JPN) and the District Education Offices (PPD) that permitted the use of government allocations for politically laden activities in schools? Tan Sri Chairman, under Item 01000 – Buildings and District Education Offices. The government has allocated RM176.59 million for 2026. This allocation reflects the government's commitment to strengthening the infrastructure and administrative capacity at the level of the State Education Department (JPN) and also the district offices. However, to ensure that every ringgit has a tangible impact on the ground, I ask the government to list the buildings and offices involved in this project by state, and to explain whether the government intends to strengthen the functions of the State Education Department (JPN) and PPD as the main implementing agencies in the agenda for improving education quality and teacher professionalism at the grassroots level.
Tan Sri Chairman, I also wish to touch on item 060400 – Allowance for Students with Special Needs. It is allocated RM299 million, and it is also to be read together with 01300 – Special Education, RM220 million. I would like to ask – how many students are currently in the special education category? And what are the categories of special education – which are regarded as special education and listed under this Ministry of Education? What is the total number of students classified under special education by race? And is there any psychological impact on these special education students, since some of them are placed together with normal students. Certainly this has a psychological effect on them. Finally, Tan Sri Yang di-Pertua, Tuan Chairman, I ask the ministry to give attention to several matters in my constituency. The first is the construction of a field for Sekolah Menengah Kebangsaan Maran 1, which has long been applied for but still has not been approved. This is the oldest school in the Maran area. Although this school is close to the public field in the district council area, it appears to have been left neglected.
And the second, I propose that a pre-U school be established in Maran for students from several Form 6 schools, which we have previously proposed, by bringing together Form 6 students from several schools in one location so that we can foster a higher spirit of learning. Because they will soon progress to a higher level, namely university or higher education. Tan Sri Yang di-Pertua – Tuan Chairman, thank you very much. Allow me to debate the Ministry of Education. Thank you.
Alright, thank you. I invite Bakri.
Thank you, Tan Sri Chairman. Item 040300 – Curriculum Development and Item 01700 – Curriculum Development Programme. Tan Sri Chairman, self-process is an important element in cultivating a sense of identity and a firm confidence within an individual. Therefore, the nurturing of a sense of identity cannot be separated from a comprehensive self-process. This includes getting to know the place where a person was raised, whether in the city, in a village or in the community they live in. I still remember when I was at school, I studied the subjects Man and Environment and Local Studies. In fact, I was required to complete coursework in the form of field studies, including examining the economic activities of a community, the history of the school, and the cultural heritage of the town itself. In the process of carrying out local studies and such assignments, I was not only able to know my beloved home village more deeply. In addition, a feeling of pride and affection arose towards the place where I was born. That feeling later shaped the desire to give back to my own homeland. Tan Sri Chairman, this matter is very important. Such processes need to be maintained because they ensure that our children feel proud, grateful and rooted in their own communities. They also have another positive effect, namely slowing the process of outflow of talent, the so-called brain drain, from small towns and rural areas. However, I have observed that the current curriculum has increasingly reduced the element of local studies. We have introduced world history, geography and
and economics. We study the history and physical geography of Malaysia. Perhaps a little about the history of the state of Johor. But what about the current situation and the origins of the students' own home villages? What is the basic history and development of Bandar Maharani? What is the story of a village named Parit Jawa, and what is its significance in the struggle against the Japanese occupiers? And what is the symbolism and significance of a village named Bukit Kepong in the effort to resist the communist attack? All of these are elements that shape local identity and the grassroots history of the nation, yet today they are not taught in the classroom. As a result, our children will not feel the pride and strong emotional bond with their homeland. Therefore, when they grow up, what reason or attraction will they have to remain in their own village? When they consider that big cities such as Kuala Lumpur offer better salaries and job opportunities. It is no surprise that many will choose to migrate to big cities because they do not see the sentimental value of history and the opportunity for identity in their place of origin. Tan Sri Chairman, beyond economic factors, it is in fact the factors of historical heritage and community kinship that give meaning to local life and can attract our young people to continue building their lives in their own village without having to leave the roots of their place. And this is what enables us to attract our young people to continue pursuing their dreams without having to leave their home villages. Accordingly, I propose that the Ministry of Education consider reintroducing the elements of local studies and local history into the existing curriculum, particularly at the primary and lower secondary levels. This approach can be integrated into subjects such as History, Geography, Bahasa Melayu or Civic Education. So that our students not only know the outside world but also understand and appreciate the history of their own community. Tan Sri Chairman, while we await the ministry's comprehensive process of redrafting the curriculum, I would like to propose that the element
of nurturing identity and love for one's home village be implemented first through a co-curricular programme in the form of local studies. As an example in my constituency, I intend to implement an initiative called "Kenali Kampung Halaman", "Cintai Muar" which could serve as a pilot co-curricular model at the national level. This programme is established because our formal education increasingly provides less exposure to the history and culture of the community itself. Many students need— sorry. Many students know foreign tourist destinations but do not know the history of the land on which they stand. This programme gives students in primary schools around Muar, especially Bakri, the opportunity to get to know, understand and recount the stories of their home village through three main phases, namely. The first phase, community work and field studies. Students will be taken to visit historical sites, rivers, small industries, traditional food and the stories of local figures. They learn through observation, recording, interviews and notes. The second phase, a Muar corner in every school. Each school will be encouraged to set up a permanent exhibition corner on local history. Including old photographs, maps, student drawings, family stories and local heritage. It will become a learning resource for all pupils. Including those who did not have the chance to join the field visits.
Masa YB.
The third phase, a young tour guide competition. Students will act as spokespersons introducing particular locations or themes about their village on an open stage. Demonstrating understanding, communication skills and self-confidence. Tan Sri Chairman, through these programmes, pupils will not only learn facts but also experience building emotional ties with their home land.
They get to know history, understand culture and cultivate values to appreciate their place of origin. At the same time, they nurture a sense of pride in giving back to the community when they grow up. Programmes like this...
YB.
...can serve as a complement to the formal curriculum while the ministry reviews the existing subject structure. In particular, to restore elements of local studies and local history in the national education system. So Tan Sri Chairman, when students are taught to know the world and at the same time to love their home land, then we will truly produce citizens who are firmly rooted, large-hearted and proud of their identity as sons and daughters of the soil. Therefore, I request that the ministry: firstly, reinstate elements of local studies and local history in the existing curriculum. Secondly, recognise and expand the implementation of co-curricular activities such as "Kenali Kampung Halaman, Cintai Muar" in schools across the country. In this way, we will produce students who are not only academically outstanding, but also individuals who understand their own cultural roots, appreciate their local community and have a genuine spirit of love for the homeland. That is all, thank you.
Alright, thank you. Next, I invite Jelutong.
Thank you, Tan Sri Chairman. I would like to begin my debate at the Committee stage by first referring to Item 00204 – Matriculation. Congratulations and well done to the ministry, the Minister and the Deputy Minister. Because after we took over the leadership and administration of the government, we see that complaints from students, especially students who achieve excellence in the SPM examination, about their chances of entering this matriculation programme have been increasing. And if I am not mistaken, in the budget presentation, the Honourable Prime Minister stated that another 1,500 places will be reserved for all students, regardless of whether they are Malay students, Indian students or Chinese students. Everyone who achieves excellence in the examination will be given the opportunity to enter matriculation. I also want to refer to the item involving infrastructure, namely infrastructure development, 010300 – Infrastructure Development. I would like
national schools, Chinese schools and Tamil schools to have their infrastructure upgraded. For example, I give the example of smart boards in all classrooms. Often we are asked by schools in
our areas, as Members of Parliament, to make contributions so that we can help students and teachers to further upgrade the quality of their learning. So, I believe all Members of Parliament give allocations that are used— allocations given by the government, but my request is that the government give attention to further upgrading the infrastructure in all schools. Especially involving the equipment used to further upgrade— to further improve the quality of learning in national schools, Tamil schools and also Chinese schools. At this stage, I would also like to ask: what is the status of the construction of the Sungai Bakap Tamil National-Type School? My congratulations and well done to the Minister, the ministry and the Deputy Minister for the announcement made by the Honourable Prime Minister regarding the construction of the Ladang Jeram Tamil National-Type School, which has been left abandoned for approximately 20 years. Tan Sri Chairman, I would like to draw Tan Sri Chairman's attention to another rather interesting matter— 040100 – Teaching and Learning Materials and 040300 – Curriculum Development. When I was in school, I studied history. I know that Parameswara was a Hindu who came from Palembang to Temasik (Singapore). After that, he migrated to Melaka. And this Parameswara later embraced Islam and became known as Megat Iskandar Shah. We also learnt about other matters concerning how Parameswara administered Melaka. Now we have a Professor. Professor Solehah who says that Parameswara— Professor Solehah Yaacob said, Parameswara may not have been Hindu, or the incidents that took place at that historic site, where the mousedeer was kicked by a dog and so on, are not true. So, I ask that these matters be elaborated. We also learnt about the Malay warriors: Hang Tuah, Hang Jebat, Hang Lekiu, Hang Lekir, Hang Kasturi when we were at school. These matters need to be emphasised, the Malay warriors...
Jelutong.
Their history in schools.
A small correction. I think it was not the dog that kicked the mousedeer, it was the mousedeer that kicked the dog.
[Dewan ketawa]
Okay, thank you for the correction of the fact, but we— I believe in learning this history. This is a matter that is so important, which we need to emphasise. And we know Captain Yap Ah Loy, who was a captain who was— one of the captains...
Kapitan. [Speaking without using the loudspeaker]
Kapitan Yap Ah Loy in Melaka, and also who was the founder of Penang? Francis Light, for example. This history is important, Tan Sri Chairman. I want to say that when we were in school, the things we learnt, we still remember...
Jelutong.
Kalau ada.
May I interject? The history of Penang just now.
Silakan.
Yes. Just now, the history that needs to be rechecked accurately is correct. If the history of Penang is stated, when Francis Light occupied Penang, it was illegal, it was void, because that agreement did not involve the British Government in England. And it needs to be rechecked when Kedah said Penang is the property of the Kedah Sultanate, Sultan Abdullah Mukarram Shah's rightful property, and this page needs to be reopened so that it is studied thoroughly, in order to determine precisely the position of Kedah and Penang.
May I ask?
Bukit Gelugor, please. I request... [Inaudible]
Regarding the issue of Kedah and the supposed claim that Kedah owns Penang and so on. Does Jelutong agree that all of that has been superseded by the Federal Constitution?
Yes, our Constitution.
The Federal Constitution of ours clearly provides for the states in Malaysia, including Penang— and has Penang not been recognised as a sovereign state on its own, what is Jelutong's view?
Thank you, Honourable Bukit Gelugor. I want to say that we need to, Tan Sri Chairman, given the shortage of time, this issue is an important issue.
Tan Sri.
If we look at the Federal Constitution...
Tan Sri Chairman, may I interject?
The Federal Constitution is very clear. The Federal Constitution— I ask Honourable Sik who asked the question just now, I will debate, I will give an explanation. Sit down first, Sik sit down, Pendang sit down too. Thank you, Pendang.
I just— let me. Tan Sri Speaker told me to sit down, so I sat down.
Tan Sri Chairman, I now...
His floor, his floor.
Yes, yes, my floor.
Ha okey.
Tan Sri Chairman.
Floor– when it's his floor, it's his.
Tan Sri Chairman, if we refer to— I ask Honourable Sik— I will give a short tazkirah. Study law, the Constitution. If we look at provision 4(2) of the Federal Constitution, 4(1) and 4(2) clearly state that Penang is one of the states in the Federation of Malaysia. That is clear. So, to answer the question from Bukit Gelugor just now, Bukit Gelugor and I are on the same line. Penang is a sovereign state, has a sovereign Constitution, is one of the states in the Federation of Malaysia, and cannot be claimed by anyone, including Kedah. That is all, thank you Tan Sri Chairman.
Jelutong.
Baik.
Perlembagaan Persekutuan.
Apa dia?
[Speaking without using the loudspeaker]
Jerai first. Jerai first.
Assalamualaikum warahmatullahi wabarakatuh, Tan Sri Chairman. 010600 – Education Sponsorship. In brief, congratulations to the MOE, which sponsors students overseas. My question is, how many students does the MOE sponsor, and is there an increase from year to year for students across the country. Because, its budget is RM109,517,400.
[Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] 030300 – Secondary Education. Mr Chairman, the end-of-session academic test for schools (UASA) is in the form of summative assessment. After that, students take the SPM examination. UPSR was abolished in 2021, and the PT3 assessment also in the same year. The difference between UPSR and PT3 is managed by the Examinations Board. UASA – the end-of-session academic test – is managed by the schools themselves. Therefore, for UPSR and PT3, the commitment of teachers was very high. The results of pupils were also not manipulated. So, thinking at class level is different from thinking at class level, that is, UASA is different from UPSR, the national-level assessment. Then, the attitude of parents differs between UPSR and UASA. I differentiate between UPSR, PT3 and UASA because it was mentioned by parties from the MOE: it is not that there is no examination, there is an examination, namely UASA, but this UASA, the end-of-session academic test, is school-based, whereas PT3 and UPSR are based on the Examinations Board. So, therefore, the attitude of the PPD, JPN and MOE, UASA is not burdensome compared to UPSR, ensure that the leadership and efforts of school administrators must be held accountable. So, the view of the majority of the people has now changed, namely they want to bring back UPSR and PT3. And the issue as mentioned will not arise, that if UPSR and PT3 exist they will produce students or pupils who are "burung kakak tua" (cockatoos).
Bringing back the UPSR and PT3 examinations for pupils does not produce, as people say, "burung kakak tua" (cockatoos), but on the contrary will make students and pupils more motivated and ready to continue to the next examination. SPM...
Jerai, please.
Ya.
Okay, thank you. In this education system, Honourable Madam, thank you. In this education system there is a history study that we should continue, and we should record true history. That is why this historical agreement, which took place between the government and the Batu Puteh case, was even before merdeka. This means that, in the Malaysian Constitution, Article 167 does not bind previous agreements or supersede them when the Federal Constitution was drafted and passed. No, it is not binding. So, what it means is, when the Penang and Kedah case is brought to be resolved in court, that is all. Like I agree with the view of the Chief Minister of Penang. Okay, we— because this issue is only about a lease. Let it be continued again, negotiated, and let the court resolve it. See you in court, if following the Chief Minister of Melaka, but refer back to the Constitution. Not a single thing in the Constitution binds that all agreements before merdeka are void. This is something we need to take note of and give attention to.
Okay, thank you. That means, the response from the Deputy Minister. God willing, shortly. Then, a little time.
Sila gulung.
I am confident that with the presence of UPSR and PT3, bringing back examinations, students will be more disciplined and the attitude of complacency will be, can be eroded, and God willing, students will no longer be tense about the examinations they will sit at the SPM level. That is all.
Thank you, Honourable Jerai. I invite Honourable Shah Alam.
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, greetings Malaysia MADANI.
Madam Chairman, I would like to continue on development expenditure. Item 00102 – Primary Academic with a budget totalling RM1.026 billion and Item 00201 – Secondary Academic with a budget totalling RM840 million. In the middle of this year, I had the opportunity to make a visit to the construction site of Setia Alam 2 National School. Alhamdulillah, earthworks were started at the beginning of the year with a target completion date of December 2027. In Budget 2026, it was informed that there will be 38 new schools to be built. One of them is SMK Setia Alam 2, which is also located under the Shah Alam Parliament. However, I would like to obtain some clarification from the ministry on the timeline of the school construction project to be implemented. Ala kulli haal, Madam Chairman, I would like to take this opportunity to record my highest appreciation and immeasurable thanks to the MADANI Government, especially the Minister, the Deputy Minister and all the staff of the Ministry of Education for this development expenditure. Madam Chairman, next I would like to touch on Item 04600 – School and Educational Institution Computerisation Systems with a budget of RM416 million. I would like to obtain clarification from the ministry, how much is spent for each school for this development and for schools under the Shah Alam Parliament that will receive special funds through the school and educational institution computerisation system. I find that there are schools that are actively seeking their own funds to upgrade digital equipment for teaching and learning purposes. I would like to suggest that their efforts not be ignored, but should be supported. And I would like to ask whether the ministry plans to provide matching funds to encourage or accelerate the procurement of school computerisation systems rather than them waiting their turn to get assistance. Madam Chairman, next, Item 01700 – Curriculum Development Programme totalling RM80.09 million. It is a reduction by half from the 2025 Budget of RM156 million. When we talk about education, we will talk about the civilisation of a nation. Education is not only about what enters the mind, but what is formed in the soul to build a country. Therefore, I want to ask about the proposed implementation of character education that was mentioned by the Honourable Minister recently. When and
how will it be implemented? Will it lead to an increase in teachers and operating expenditure? I am of the view that character education must be implemented across the curriculum and also across the co-curriculum. Character education needs to be the core of the education system, not merely an additional programme. In connection with that, I would also like to touch on the more fundamental matter, namely the role of teachers in education. That is why in 1986, the Ministry of Education Malaysia was changed to the Ministry of Education Malaysia. Its Minister at that time was named Anwar Ibrahim. Now he has become the Minister, even the Prime Minister. That change was not cosmetic, but intended to emphasise that the duty of teachers is not merely to teach, but to educate people holistically, covering personality, morals, values and also national development. However, today, Madam Chairman, the reality is rather sad. Teachers are shackled by guidelines and controls that may be rather excessive, to the point that they cannot even glance at a pupil. Why can't they even glance at a pupil? They have to involve parents, get involved, and so on.
That is why living education requires a spirit between teacher and pupil. If teachers only dare to teach, but do not dare to educate, then the spirit of education will be lost from what we...
Shah Alam.
Ya.
May I interject? Just briefly, regarding an issue that you may be able to make part of your speech, Shah Alam. Regarding teachers in Penang at SMJK(C) Chung Hwa Confucian where those teachers have now been charged in court for caning or rotanning one of the students at that school. What is Shah Alam's view? Is this something that should be addressed by the Ministry of Education? Should the Ministry of Education have a stance on this issue? Since this is a discipline issue, the discipline of students and a― whether guidelines should be given by the Ministry of Education. What is the Honourable Member's view?
Yes. I, Madam Chairman, I strongly agree with Bukit Gelugor that the role of teachers is not only to teach, but also to educate. If necessary, with some element of force,
but if the purpose is indeed to educate, then the ministry must give appropriate assessment, but that force must not be such that it causes injury, yes, to the point of causing..
Honourable Member, your time is up. Your time is up. Please wind up.
Okay, I will wind up, Chairman. Finally, I want to emphasise that I do not agree with the view that examinations will produce a generation of "burung kakak tua" (cockatoos), yes. Examinations are not the enemy of learning. They are a tool to assess understanding and measure effectiveness, not merely rote memorisation. The problem is not with examinations, but with our approach to establishing a comprehensive examination system to ensure that assessment is holistic in form. Thank you, Honourable Madam Speaker. Shah Alam requests to support.
Thank you, Honourable Shah Alam. I invite the last debater, Honourable Sik.
Assalamualaikum warahmatullah and good afternoon. Thank you, Honourable Madam Chairman. I will proceed directly to Item 01800 – Education Resources and Technology, which recorded an increase in allocation from RM14.7 million in 2025 to RM56.6 million in 2026. With this significant increase, the main question that should be raised is what the ministry's detailed plan is for integrating artificial intelligence (AI) into the education system so that it is truly utilised to improve the effectiveness of pupil learning and reduce the burden of teachers' work. AI has great potential to improve efficiency and the quality of teaching if used ethically and strategically. In teaching, AI can help teachers generate learning material modules and practice questions according to pupils' abilities, thereby accelerating teachers' preparation and improving student achievement. I would like to ask, has the ministry approved an AI integration framework that covers the policy, operational plan, objectives, scope, implementation phases and key performance indicators (KPIs) for AI-based learning? If so, when will that document be completed and implemented?
Likewise, I would like to ask how the Ministry of Education Malaysia (KPM) plans to implement the AI competency framework for teachers, with permission, in line with UNESCO guidelines, including in pre-service and in-service training? What is the target number of teachers to be trained in the first phase, and what are the main training modules to be used? In addition, what AI pilot projects are being or will be carried out, including their locations, the number of schools involved, the implementation period and the measures of their effectiveness? Next, I refer to Item 010300 – Infrastructure Development, which shows a reduction in allocation from RM24.6 million in 2025 to RM23.3 million in 2026. This reduction raises the question of the extent to which this allocation can truly narrow the gap between urban and rural schools, especially in my district, Sik, Baling, and in Sabah and Sarawak, where many dilapidated schools still need special attention from the ministry, including the lack of basic facilities such as science laboratories, clean toilets, computer laboratories and stable internet access. As of January 2023, the Ministry of Education Malaysia had identified about 830 schools nationwide with dilapidated school blocks at Grade 6 and 7 that require redevelopment. In Sabah and Sarawak alone, as of 2024, 1,069 dilapidated schools had been identified and 693 of them had been repaired. However, many schools in rural and interior areas still face old buildings, leaking roofs, unstable electricity supply and limited internet access, which makes the effort to create a conducive learning environment very challenging. On the other hand, elite schools in urban areas such as fully residential schools (SBP) continue to enjoy more modern and complete facilities. As a result, this will cause a gap in student achievement, in terms of merit, and in terms of what students in urban and rural areas obtain. Next, the question is, what concrete steps are being or will be taken by the ministry to ensure that educational equity can truly be achieved? Among them, how does the ministry plan to narrow the infrastructure gap between urban and rural schools, which involves the schools-
schools in the interior, which I mentioned just now, including in Peninsular Malaysia and in Sabah and Sarawak? Lastly, I refer to Item 01700 – Curriculum Development Programme, which shows a major reduction in allocation from RM156.3 million in 2025 to only RM80.1 million in 2026. I refer to the subject of History, which is much discussed in this House today, and which is very important in shaping national identity and character. We are talking about the history of Kedah and Penang that was raised earlier by friends from Jelutong and so on. However, what matters is that every historical study must very carefully lay the foundations on the origins of that history. And if we look at the debate on Kedah and Penang relating to the 1786 event and the status of Penang, there is an academic study report such as The 1786 Acquisition of Pulau Pinang: Unveiling the Light Letters and R. Bonney's Kedah 1771–1821, which shows that this discourse remains open to re-evaluation that may affect the national narrative. That means this history can always be reopened and cannot be closed within just one reference source. If this curriculum does not emphasise what is accurate and balanced...
Chairman, I am invoking standing order.
Yes, standing order.
Standing order. Standing order. Chairman, I refer to 36. I ask Members of Parliament from Penang to support this as well. 36(9)(c), words that would arouse feelings of resentment or hostility. Here we are discussing the sovereignty of Penang as a state within the Federation of Malaysia, and the Federal Constitution has already guaranteed it. Why does the Honourable Member for Sik need to raise this matter? We are debating the committee's issues.
Yes, the Honourable Member for Sik. Please return to the debate on the Budget Committee.
What has this got to do with Kedah's claim over Penang? Thank you, Chairman.
Honourable Member. Honourable Chairman, I have not the slightest intention of stirring up hatred.
Penang is a sovereign state. It has nothing to do with Kedah.
However, I clearly mentioned the matter of history.
Yang Berhormat.
Penang is a sovereign state, and it has the Federal Constitution.
I was referring to history. Does Jelutong want to erase the history of Kedah and Penang?
Kedah has no right at all.
Honourable Member, we are now in the Budget Committee, not history. Time is also up. So, I thank the Honourable Member for Sik. Now I ask the Honourable Minister to respond. Time allocated is 30 minutes.
Thank you, Madam Chairman.
Thank you, Madam Chairman. I thank the 30 Honourable Members who have participated in the committee stage debate for the Ministry of Education Malaysia this afternoon.
Indeed, the Ministry of Education Malaysia has been allocated the highest approved allocation, which is more than RM66 billion. We know that expectations are very high, and at the same time the matters this Ministry of Education must deliver are also very important. Throughout the debate session, many matters have been raised by Honourable Members, 30 of whom have participated in this debate. I will try to answer as many as possible, and if there are any matters, issues or questions that I have not had time to answer in
this winding-up, the Ministry of Education will provide written answers to the Honourable Members. The MADANI Budget 2026 has a major impact on the national education ecosystem through six main focuses, and in this winding-up I will also break down these six focuses. The first focus is: (i) TVET and STEM; (ii) educational infrastructure; (iii) access, equity and quality of education; (iv) student welfare; (v) teacher well-being and professional enhancement; and (vi) safe schools. I refer to the first focus, concerning TVET and STEM. Issues and proposals were raised by the Honourable Member for Gua Musang and the Honourable Member for Tenggara regarding STEM education in our country. TVET education under KPM is formal education offered to students who have completed Form 3 and remain within the KPM school system, regardless of academic and socio-economic background, including Orang Asli students. For the information of the Honourable Member, so far there are 59 Orang Asli students following the KPM TVET programme in Gua Musang, Kelantan, namely seven Orang Asli students taking the vocational subject Computer Graphics at SMK Chiku 2, and 52 others taking the specialised elective subject Agriculture at SMK Panggung Jaya. SMK Panggung Jaya is a special secondary school for Orang Asli students and Orang Asli students who have completed Form 3 and have an inclination towards skills fields, who may continue studies in TVET through a special school admission assessment for entry into the Vocational College (KV) and also into technical secondary schools. At the same time, KPM also offers a TVET programme pathway for students who have completed SPM to diploma programmes at KV. Applications can be made, where the diploma programme at KV requires students to obtain at least three credits in the SPM examination. Students in the Gua Musang district who are interested in following the TVET programme may apply at KPM institutions such as KV Kuala Krai, Kelantan, KV Tanah Merah, Kelantan, KV Kuala Lipis, Pahang, and Model Khas Comprehensive School 11 at SMK RPS Betau.
At the same time, regarding the issue raised by the Honourable Member for Tenggara, the outstanding achievement of KPM TVET students was evident when the Malaysian contingent was crowned overall champion at WorldSkills ASEAN Manila 2025, through the success of students from KV Kajang. If I am not mistaken, that was about two months ago. At the same time, through the success of students from KV Kajang, Selangor, a gold medal was won, KV Butterworth, Penang won a bronze medal in Automobile Technology, and KV Sungai Petani 1, Kedah won a gold medal in Web Technologies. Earlier, the Honourable Member for Tenggara also mentioned the opportunity to take part in TVET programmes together with the National TVET Council (Majlis TVET Negara), namely in China, and KPM welcomes the proposal from the Honourable Member for Tenggara. At the same time, since KPM is also one of the members of the National TVET Council, and the Honourable Member for Tenggara is one of the members of the National TVET Council, many collaborations can be created at the National TVET Council level. Likewise, TVET education under KPM has achieved a very commendable performance, where applications to enter KV this year have reached more than 60 thousand people for about 17,000 vacancies available at KV. And when we talk about the employability development of our children, our TVET graduates, we have achieved, for three consecutive years, more than 99 per cent employability of our children or TVET graduates at KPM level. Madam Speaker, Madam Chairman, I move to the focus on access, equity and quality of education. There is a new matter that was raised earlier and has never been mentioned or answered in this august House, namely the issue of 'co-teaching' or team teaching, which was raised this afternoon by the Honourable Member for Kluang, the Honourable Member for Bagan Serai, earlier by the Honourable Member for Temerloh and by other Honourable Members. First of all, I thank the Honourable Member for Kluang, who has expressed support for the concept or team teaching
specifically in one subject, namely Nature and Humanity: Integrated Learning at Level 1. For the information of the Honourable Members and this august House, team teaching or co-teaching is defined as a pedagogical method in which two teachers work together synergistically in one classroom. Earlier, an Honourable Member said how a teacher and a teaching assistant work together. The concept is not that; the concept is two teachers collaborating synergistically in the classroom and in the Integrated Learning subject at Level 1. This collaboration covers the process of planning, implementing and assessing teaching and learning together. This method is very important to make a success of the new subject, namely Nature and Humanity: Integrated Learning at Level 1. For the information of the Honourable Members and this august House, under the School Curriculum 2027, KPM will introduce a new subject at Level 1: Nature and Humanity – Integrated Learning. It covers elements of science, arts, music, health, TVET, technology and digital. It comprises six periods each week. For Level 2, namely in Year 3 and Year 4, we have two different subjects for integrated learning, namely first, Science and Technology Exploration, an integrated learning that covers elements of education, science, environment, TVET, technology and digital, and second, Arts and World of Learning Exploration, which covers elements of geography, history, arts and music. In KPM's plan, both of these integrated learning subjects will be taught through team teaching. This means that co-teaching will not be implemented for all subjects or all courses as some parties claim, but only for integrated learning, namely the two subjects I mentioned just now. Whether we have carried out a pilot. Yes, there was an earlier pilot involving 130 teachers in 65 primary schools of various categories. At the same time, in order to answer misunderstandings or confusion among certain parties on how we can implement this co-teaching with existing teaching staff.
I refer to the fact that the Honourable Minister and the Director General of Education Malaysia have previously explained again that the focus of co-teaching is for the Nature and Humanity subject, because this subject combines more than one discipline of knowledge and more than one element of education. KPM will implement this pedagogical practice carefully, taking into account all aspects of implementation in stages and taking into account the level of readiness of schools and teachers. On this matter, subject panels and head teachers have autonomy to determine the co-teaching approach in schools.
This is also one of our efforts to empower our head teachers, giving autonomy to our head teachers, who know more than anyone else how to administer their respective schools. For example, at a time when a school has sufficient teachers to implement co-teaching for this integrated subject, this integrated learning, but at another time, perhaps some teachers are on sick leave or on relief leave. In this situation, the head teacher has autonomy to decide whether to replace the absent teacher with another teacher, or whether we simply use only one teacher in teaching this integrated learning subject. Therefore it is clear that the approach we take for co-teaching is flexible in its implementation. The schools and KPM will ensure that we have sufficient teaching staff and at the same time there is no additional burden on our teachers. With this explanation, I hope that the issue of co-teaching has been answered by KPM in this august House. At the same time, earlier it was mentioned regarding— by the Honourable Member for Ledang regarding why our operating expenditure has decreased. Based on our review just now, overall the operating expenditure of KPM for 2026 is RM59.9 billion. This amount shows an increase of RM2 billion or 3.49 per cent compared with the operating allocation of 2025, which is RM57.9 billion. The Honourable Member for Kuala Kedah asked about the School Curriculum 2027 in relation to teacher training. For the information of the Honourable
Members, through the National Preschool Standard Curriculum and the Standard Curriculum for Primary Schools, 14 universal values are taught and inculcated among pupils. These values are further developed into 18 universal values in the KSSM, and KPM also implements Civics Education beginning at the preschool level. At primary and secondary school levels, Civics Education is integrated into five subjects, including Malay Language, English Language, Islamic Education, Moral Education and History, to emphasise values such as love, mutual respect, responsibility and happiness. Regarding the question from the Honourable Member for Kluang on the issue of co-teaching, I have earlier mentioned that this subject is implemented involving various hands-on activities, and the co-teaching method enables closer guidance and supervision during practical activities. The Honourable Member for Kluang also mentioned the position of private preschool classes. For the information of the Honourable Member for Kluang, KPM will next year expand and further strengthen our efforts to expand preschools. Next year KPM targets a new expansion of 350 preschool classes. This is in line and consistent with the aspiration and intention of KPM to ensure that our children receive sufficient early education and comply with the existing national curriculum. The total allocation approved for KPM is RM125 million for the expansion of preschools as an initiative for 2026, 350 preschools. As for the Honourable Member for Kluang's question on private preschools, private kindergartens remain relevant and continue to support KPM's efforts to provide access to preschool education, especially in areas without KPM preschool expansion. Private kindergartens provide parents with options for preschool education services according to their respective needs. Private kindergartens are subject to the provisions of the Education Act [Act 550], including the use of the national preschool curriculum. Inspections are carried out periodically and continuously on all private kindergartens registered with KPM, as well as enforcement action against unregistered private kindergartens.
Sememangnya pihak Ministry of Education (KPM) juga beberapa kali saya sebut dalam Dewan yang mulia ini untuk pusat-pusat prasekolah ataupun tadika-tadika yang belum lagi berdaftar dengan KPM di bawah Akta Pendidikan. Sememangnya pintu KPM selalu terbuka kepada semua. Ini adalah penting untuk memastikan anak-anak kita yang masuk ke Tahun 1 kelak di sekolah-sekolah KPM. Mereka mampu menguasai 3M, mereka mampu untuk mengikuti kurikulum kebangsaan yang kita ada. Dan untuk kesemua tadika ataupun prasekolah yang berdaftar dengan pihak KPM di bawah Akta Pendidikan, maka kesemua tadika ini haruslah mengikuti kurikulum kebangsaan yang mana kita percaya bahawa merupakan kurikulum yang terbaik bagi pembesaran dan juga pendidikan awal kanak-kanak kita. Puan Pengerusi, saya beredar kepada...
Puan Pengerusi, saya ada soalan.
Ya, sila.
Ya. Terima kasih Yang Berhormat Timbalan Menteri atas jawapan terperinci tentang pendidikan awal itu. Jadi soalan saya tadi adalah berkenaan dengan pusat-pusat pendidikan awal yang segelintirnya tidak mematuhi undang-undang iaitu mungkin silibus mereka ikut standard KPM, tetapi mereka tidak mematuhi undang-undang secara keseluruhannya. Contohnya, gaji minimum pun mereka 'tak patuhi, mereka 'tak bagi cikgu mereka gaji minimum. Jadi apa pendidikan yang mereka boleh tawarkan kepada generasi hadapan kita, masa harapan kita?
Okey, terima kasih Yang Berhormat Kluang. Saya amat bersetuju yang mana selaku pengusaha bagi tadika-tadika yang kita ada, sekurang-kurangnya berkenaan dengan peruntukan undang-undang yang sedia ada, gaji minima seperti yang dibangkitkan oleh Yang Berhormat Kluang ini haruslah dipatuhi. Dan pada masa yang sama, kenapa pihak KPM hendak tadika-tadika tersebut didaftarkan dengan KPM? Kerana apabila ia hendak didaftarkan dengan KPM juga harus– tadika-tadika yang berkaitan juga harus mematuhi segala perundangan ataupun peruntukan berkenaan dengan keselamatan premis dan kepatuhan premis terhadap segala peruntukan ataupun peraturan yang sedia ada. Ini bukan untuk kebaikan ataupun untuk kepentingan mana-mana pihak, tetapi adalah untuk kebajikan dan juga keselamatan anak-anak kita. Puan Pengerusi, izinkan saya untuk masuk ke satu perkara lagi yang mungkin akan menarik lebih banyak minat iaitu berkenaan dengan infrastruktur
pendidikan. Isu ini sekali lagi juga banyak dibangkitkan oleh rakan-rakan dalam Dewan yang mulia ini. Ahli Yang Berhormat Kangar ada dalam Dewan ini. Beliau— Ahli Yang Berhormat bangkit berkenaan dengan SK Seri Indera. Berdasarkan kepada semakan KPM, Sekolah Kebangsaan Seri Indera, Perlis telah pun mempunyai ruang serba guna terbuka yang turut berfungsi sebagai tempat pelaksanaan aktiviti murid dan kawasan menunggu murid. Walau bagaimanapun, berkenaan dengan keperluan untuk pembinaan dewan terbuka berbumbung, sekiranya ada, pihak KPM akan meneliti dari masa ke semasa tertakluk kepada keutamaan dan juga kedudukan kewangan sedia ada. Yang Berhormat Igan ada bangkit berkenaan dengan PPD Daro dan sama ada ia akan dibina dalam belanjawan ini. KPM sememangnya ia telah pun diluluskan pembinaan bangunan baharu Pejabat Pendidikan Daerah Daro, Sarawak dalam RP1 Tahun 2026, RMK13 iaitu dalam belanjawan ini bagi menampung keperluan operasi dan juga pengurusan pendidikan di kawasan berkenaan. Kelulusan skop projek ini merangkumi kemudahan berkapasiti 80 pegawai dan juga kakitangan serta kemudahan piawai yang lain. Yang Berhormat Kangar juga ada sebut berkenaan dengan Sekolah Sukan Negeri Perlis dan juga Sekolah Sukan Malaysia Perlis. Kita sedia maklum bahawa SSM Perlis ini telah pun di tangguh lama akibat daripada ketidaksiapan oleh kontraktor.
Dan bagi SSM Perlis seperti mana semua sedia maklum, kontraktor penyelamat telah pun ditamatkan kontrak pada 13 Mei 2025 dan kini KPM mengambil satu pendekatan baru. KPM telah dibenarkan untuk melantik syarikat berkaitan kerajaan GLC sebagai kontraktor penyiap. KPM dengan kelulusan Kementerian Kewangan telah mengenal pasti GLC yang berkelayakan dan sedang dalam proses memuktamadkan rundingan yang dijangka pada bulan Disember nanti. Tempoh penyiapan dan selepas itu SST akan dikeluarkan dan kita jangka tempoh penyiapan adalah dalam lingkungan 10 bulan hingga 12 bulan dari tarikh SST. So kita belum sempat lagi sampai ke peringkat untuk perbincangan skop dan juga kos dan kita sedang dalam usaha untuk memuktamadkan proses ini dan selepas itu SST boleh dikeluarkan. Ini sememangnya satu projek yang mana di peringkat KPM kita memberikan fokus dalam masa beberapa tahun ini untuk kita memastikan projek ini akan berjaya, okey.
Yang Berhormat Klang tadi Yang Berhormat Gopeng ada mencelah, semasa dalam pencelahan beliau kepada perbahasan oleh Yang Berhormat Klang. YB Klang 'tak ada, tetapi saya mengambil kesempatan ini untuk memaklumkan kepada Yang Berhormat Gopeng berkenaan dengan isu yang dibangkitkan iaitu SJK(T) Gopeng yang telah pun ada bangunannya berada di skala tujuh. Sememangnya KPM bagi kesemua aliran sekolah kita akan cuba sedaya upaya untuk meneliti keperluan untuk pembinaan sama ada pembinaan semula sama ada untuk bangunan baharu ataupun pembinaan semula bagi bangunan- bangunan daif. SJK(T) Gopeng ini mempunyai bangunan daif berskala tujuh, dan untuk makluman Ahli Yang Berhormat Gopeng, projek ini telah pun lulus dalam RMKe-13 RP1 iaitu dalam Belanjawan ini. Skop projek iaitu meroboh tiga blok bangunan daif yang sedia ada, pada masa yang sama membina blok bangunan gantian iaitu enam bilik darjah, nombor dua pejabat pentadbiran, nombor tiga pejabat guru, nombor empat stor sukan dan seterusnya membina bangunan tambahan yang merangkumi bengkel RBT, makmal sains, bilik kesihatan, bilik bimbingan dan kaunseling, bilik mesyuarat dengan kapasiti 19 orang. Pada masa yang sama turut meliputi perolehan perabot, peralatan dan kelengkapan serta kemudahan-kemudahan lain mengikut piawaian. Kos projek diluluskan RM14 juta bagi SJK(T) Gopeng. Seterusnya, adalah Yang Berhormat Bagan Serai, 'tak ada, saya skip. Yang Berhormat Kuala Kedah, ada? Ada. Yang Berhormat Kuala Kedah berkenaan dengan status projek pembinaan. Secara keseluruhannya di bawah RMK-12 RP5 tahun 2025 di negeri Kedah, terdapat 166 projek KPM yang dilaksanakan dengan kos sebanyak RM2.11 bilion. Jumlah peruntukan yang diluluskan pada tahun 2025 adalah sebanyak RM180.32 juta daripada 166 projek ini 68 projek telah siap, 28 projek sedang dalam pelaksanaan dan 70 projek dalam fasa pra pelaksanaan. Manakala dalam RMK-13 RP1 tahun 2026, kerajaan telah meluluskan 23 projek baharu dan 129 projek sambungan di negeri Kedah dengan siling tahun hadapan 2026 sebanyak RM260.8 juta. Yang Berhormat Klang tidak ada.
Yang Berhormat Menteri.
Ya, sila.
Terima kasih atas jawapan yang telah diberikan. Cuma saya hendak mendapatkan penjelasan, daripada jumlah nilai tersebut berapakah yang melibatkan pembinaan-pembinaan
bangunan sekolah-sekolah ataupun penambahbaikan struktur sekolah dalam kawasan Parlimen Kuala Kedah. Sekian, terima kasih.
Khas untuk kawasan Parlimen Kuala Kedah, izinkan saya untuk memberikan maklumat terperinci kepada Yang Berhormat secara bertulis. Terima kasih.
Okey, terima kasih.
Yang Berhormat Ledang membangkitkan berkenaan dengan isu penyelenggaraan. Sememangnya isu penyelenggaraan ini merupakan fokus utama bagi KPM dan KPM dalam masa dua tahun ini kita mengambil pendekatan yang lebih progresif. Kita bukan sahaja menyelenggara bangunan-bangunan yang memerlukan penyelenggaraan, tetapi kita juga mengambil pendekatan supaya bangunan tersebut tidak jatuh dari skala 6, jatuh ke skala 7 dan dijadikan bangunan daif. Maka melalui inisiatif ubah suai dan naik taraf USNT, kita pastikan bahawa kita pastikan untuk sekolah-sekolah yang ada bangunan skala 6 kita perbaiki dan supaya ia boleh turut menjadi skala 5. Pada masa yang sama kita juga mempunyai banyak sekolah yang telah pun melebihi usia 70 tahun dan pihak KPM mengambil pendekatan yang progresif untuk menyemak dan juga menilai keadaan kesemua sekolah-sekolah tersebut dan usaha ini sedang dilakukan. Untuk makluman Ahli Yang Berhormat Ledang, KPM dalam melaksanakan penilaian keadaan aset sekolah melalui Facility Condition Assessment (FCA). Tumpuan telah pun diberikan kepada 2,262 buah sekolah yang melebihi usia 70 tahun. Sehingga Disember 2024, 1,149 buah sekolah telah pun selesai FCA dan antaranya 53 buah sekolah dikenal pasti berusia lebih 70 tahun di Parlimen Ledang. Setelah kita mendapat laporan daripada FCA ini, maka KPM akan mengambil tindakan untuk melaksanakan kerja-kerja penyelenggaraan, tetapi juga bergantung kepada ketersediaan kewangan dan juga peruntukan yang sedia ada. Disebut berkenaan dengan...
[Bangun]
Ya, sila.
Boleh ya, terima kasih. Saya ucap terima kasih kepada pihak KPM kerana mengambil berat tentang isu penyelenggaraan dan saya rasa setiap kali dalam perbahasan Belanjawan perkara ini ditimbulkan oleh ramai daripada kalangan Ahli-ahli Yang Berhormat.
Jadi saya memang mencadangkan pada asalnya supaya kita ada model jangka masa panjang berkenaan dengan penyelenggaraan kerana kosnya akan sentiasa bertambah dan kita mesti ada satu model yang lebih ampuh supaya perkara ini tidak menjadi isu knee-jerk. Maksudnya setiap kali nanti di kalangan ada Ahli-ahli Parlimen dalam peruntukkan perlu mengeluarkan satu peruntukan yang amat besar untuk penyelenggaraan. Ramai daripada kalangan Ahli Yang Berhormat yang akan setuju tentang perkara ini. Jadi saya rasa perkara ini kita perlu ada planning yang menyeluruh dan ada jangka masa panjang. Yang kedua, Yang Berhormat Timbalan Menteri tadi tak sebut tentang pembangunan PPD di Tangkak yang saya juga ada tanya selain daripada Sekolah Kebangsaan Bandar Baru Tangkak, minta juga pihak Menteri jelaskan.
Terima kasih Ahli Yang Berhormat Ledang. Berkenaan dengan PPD di Tangkak nanti saya semak dan saya akan bagi jawapan secara bertulis. Namun, saya amat bersetuju dengan apa yang dinyatakan oleh Yang Berhormat Tangkak berkenaan dengan bagaimana kita mengambil ataupun menyelenggara mengambil pendekatan dalam penyelenggaraan sekolah. Sememangnya seperti yang saya sebut tadi, sekurang-kurangnya dalam masa dua tahun kebelakangan ini, saya boleh sebut sekurang-kurangnya dua inisiatif baharu telah pun diambil, nombor satu USNT. Ubah suai naik taraf kita mengenal pasti bangunan-bangunan di skala enam kita cuba buat naik taraf dan juga menyelenggarakan supaya ia tidak jatuh ke skala tujuh, itu satu. Nombor dua facility condition assessment. Kita akan siapkan kesemua assessment ataupun penilaian pada tahun ini dan kita akan cuba untuk memberikan fokus kepada sekolah-sekolah yang mana kita telah pun mengenal pasti memerlukan perhatian yang lebih serius. Untuk makluman Ahli Yang Berhormat, pada tahun hadapan kita telah pun diperuntukkan lebih kurang RM2 bilion bagi tujuan untuk pembinaan semula bangunan daif di sekolah dan untuk tujuan penyelenggaraan. Belanjawan 2026 peruntukan yang diluluskan untuk pembinaan semula bangunan daif daripada RM2 bilion itu, RM1.06 bilion adalah untuk tujuan pembinaan semula bangunan daif bagi kos siling bagi tahun 2026. Manakala selepas itu penyelenggaraan Institusi KPM kita ada RM860 juta yang mana RM60 juta kita ada komitmen untuk diberikan kepada— ditumpukan kepada penyelenggaraan kuarters dan yang lain lebih kurang RM800 juta adalah
untuk penyelenggaraan sekolah di Semenanjung, Sabah dan juga Sarawak. Ini peruntukan yang kita ada kita perlu mengedarkan peruntukan yang sedia ada kepada sekolah-sekolah kerajaan dan juga kita memberikan sumbangan kepada sekolah- sekolah bantuan kerajaan seperti yang KPM laksanakan setiap tahun.
Dan mungkin Yang Berhormat Pengerusi, saya juga— Yang Berhormat Kapar, ada? Mungkin saya minta sedikit masa untuk menjawab Yang Berhormat Kapar dan mungkin yang lain saya boleh jawab secara bertulis. Yang Berhormat Kapar tanya berkenaan dengan SK Teluk Kapas. SK Teluk Kapas telah pun diluluskan RP1 2016 RMK11. Pada ketika itu, kos adalah sebanyak RM32 juta. Walau bagaimanapun, projek ini tertangguh kerana isu kelulusan kebenaran merancang (KM), di mana PPD menetapkan syarat untuk pembinaan jejantas yang tiada dalam skop asal projek perlu dilaksanakan bersekali dengan pembinaan sekolah. Kelewatan ini juga berlarutan ekoran daripada pandemik COVID-19 dan menyebabkan kos asal projek ini tidak lagi mencukupi. Sehubungan itu, KPM telah meneliti semula hala tuju pelaksanaan projek untuk dipohon semula dalam RP2 RMK13 tahun 2027 dengan keperluan pendidikan yang terkini. So, ini berkenaan dengan SK Teluk Kapas. Yang Berhormat Baram ada?
Yang Berhormat...
Ya.
Masa sudah tamat.
Ya.
Berkenaan isu Chung Hwa, ada apa-apa jawapan yang telah pun saya bangkit isu rotan di Sekolah Chung Hwa Confucian di Pulau Pinang?
Okey, terima kasih. Mungkin last, bagi saya menjawab Yang Berhormat Bukit Gelugor. Yang Berhormat...
Sini Yang Berhormat Menteri, Masjid Tanah pun minta untuk (DBP) Dewan Bahasa dan Pustaka. Terima kasih.
Okey, berkenaan dengan isu DBP, saya masih menunggu input daripada kementerian. Nanti mungkin saya boleh bagi secara jawapan— secara bertulis.
Berkenaan dengan dua orang guru yang telah pun didakwa di mahkamah. Apa yang saya boleh sebut di sini adalah apabila di bawah garis panduan KPM, kita memberi garis panduan yang lengkap dalam segala urusan berkenaan dengan menghukum, melaksanakan hukuman terhadap murid-murid. Apa pun berkenaan dengan kedua-dua guru itu, saya sendiri telah pun berjumpa dengan kedua-dua guru tersebut dua minggu yang lepas. Dan pihak KPM prihatin terhadap apa yang berlaku dan kita akan tengok apa yang KPM boleh lakukan untuk membantu dalam mencapai satu penyelesaian yang terbaik dalam perkara ini. Terima kasih Puan Pengerusi, atas masa yang diberikan. Dan kepada Ahli- ahli Yang Berhormat yang telah pun membangkitkan isu dalam perbahasan ini, pihak KPM akan memberikan jawapan secara bertulis kepada Ahli-ahli Yang Berhormat sekalian. Terima kasih Puan Pengerusi. [Tepuk]
Terima kasih Yang Berhormat Timbalan Menteri Pendidikan. Ahli-ahli Yang Berhormat, masalah iaitu wang sejumlah RM59,884,100,700 untuk Kepala B.63 Anggaran Perbelanjaan Mengurus 2026 jadi sebahagian daripada Jadual hendaklah disetujukan. [Masalah dikemuka bagi diputuskan, dan disetujukan] [Kepala B.63 diperintah jadi sebahagian daripada Jadual]
Masalahnya ialah bahawa perbelanjaan di bawah Kepala P.63 Anggaran Perbelanjaan Pembangunan 2026 hendaklah diluluskan. [Masalah dikemuka bagi diputuskan, dan disetujukan] [Kepala P.63 jadi sebahagian daripada Anggaran Perbelanjaan] [Majlis Mesyuarat bersidang semula] [Timbalan Yang di-Pertua (Puan Alice Lau Kiong Yieng) mempengerusikan
Ahli-ahli Yang Berhormat, Mesyuarat Dewan hari ini ditangguhkan sehingga jam 10 pagi, hari Khamis, 13 November 2025.
[Dewan riuh]
[Dewan ditangguhkan pada pukul 7.24 malam]
Special ChamberSpecial Chamber
[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Meeting]
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Proposal to Upgrade Federal Road FT1533 from Simpang Jengka 13 to the T-Junction of Bandar Pusat JengkaSpecial Chamber
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, first of all, allow me to record my highest appreciation to the Special Chamber, especially Mr Speaker, for the opportunity given to me to raise a very important matter under Standing Order 17(1) for debate at the Special Chamber stage.
The issue I wish to raise today concerns Federal Road FT1533, which connects Simpang Jengka 13 to Bandar Pusat Jengka. This route is one of the main arteries for thousands of local residents, including students, smallholders, traders and workers who travel back and forth every day to the town centre, educational institutions, hospitals for treatment and various other facilities.
Mr Speaker, the condition of this road is now extremely worrying.
Its limited width can no longer accommodate the high volume of vehicles, especially on holidays. Meanwhile, the very low and narrow road shoulders may expose users, especially motorcyclists and drivers of small lorries, to the risk of skidding or plunging when trying to avoid larger vehicles. Furthermore, the damaged and potholed road surface makes the situation even more dangerous, especially during heavy rain and the current monsoon season.
The lighting problem is also very evident. The lack of adequate street lights makes this route dark and high-risk, especially at night. This combination of factors has caused many accidents, including fatal ones. I receive various complaints from residents almost every month, and indeed this issue has gone viral on social media because the same incidents happen too often.
Mr Speaker, I would like to clarify that the motion brought forward this time actually refers to the road from Simpang Jengka 21 towards the Simpang Tiga of Bandar Pusat Jengka. However, it is understood that the maintenance work recently carried out was done on the route leading to Felda Jengka 9, which is located within the Parliamentary constituency of Jerantut, not the Parliamentary constituency of Kuala Krau. This has caused some confusion among local residents who very much need immediate attention on the Jengka 13 route.
Therefore, with humility, I request that the Ministry of Works give особое attention by carrying out a comprehensive assessment of this road. And, I hope that the allocation and implementation schedule for the upgrading works can be announced as soon as possible, including road widening, raising of road shoulders, repair of damaged surfaces and installation of new street lights.
This issue is not merely a matter of user comfort, but a matter of the safety of people's lives and the economic sustainability of the local residents.
I earnestly request that the ministry re-examine this matter with full concern, especially the Honourable Minister, who is well known for works that have greatly benefited us. Thank you, Dato' Yang di-Pertua.
Honourable Minister, please proceed.
Thank you, Mr Speaker. For the information of the Honourable Member for Kuala Krau, the Upgrading Project for Federal Road FT1533, Jalan Utama Jengka Utara/Barat, starting from Persimpangan Jengka 12 to Persimpangan Jengka 25, which connects Bandar Jengka and Kuala Krau, Pahang, with a length of 11.3 kilometres, has been approved under the Fourth Rolling Plan of the Twelfth Malaysia Plan. The main scope of this project is as follows, namely:
(i) widening of the existing road over a length of 7.7 kilometres from Persimpangan Jengka 12 to Persimpangan Jengka 25; and
(ii) widening of the existing road over a length of 3.6 kilometres from Persimpangan Jengka 12 towards Federal Road FT83 at selected locations.
The scope of this approved project also covers the upgrading works for Road FT1533 at Persimpangan Jengka 13 and Jengka 21. The tender invitation for this project is expected to be advertised in December 2025.
With regard to the maintenance issue of this route, the Ministry of Works, through its agencies under it, is always committed to ensuring that the road network in Malaysia is maintained at the best standard and provides safe and comfortable services to road users. The FT1533 route is also not excluded, where in — for the period 2023 to 2024, the ministry allocated a sum of RM2.27 million under the routine maintenance programme, periodic pavement maintenance and non-pavement periodic maintenance
non-pavement periodic maintenance. These works were carried out by the concession company through Work Orders (AK) and involved a number of pavement periodic works.
All the said works were fully completed in that year.
For 2025, a number of non-pavement periodic works valued at RM130,000 have been completed. Maintenance in other locations that require it has been identified and will be carried out once the allocation approval from the Ministry of Finance is obtained, and it is determined based on the findings of the assessment of the critical level of road damage, or PCA, yes, which is carried out across the entire Federal Road network under the supervision of this ministry.
In addition, the scope of maintenance by the concession company also covers scheduled routine maintenance works such as pothole patching, regrading of road shoulders, grass cutting, cleaning of road furniture, cleaning of bridges and culverts, cleaning of roadside drains and routine patrols to ensure the safety and comfort of road users are guaranteed.
The ministry takes note of the issue raised by the Honourable Member regarding the need for additional lighting in this area.
For your information, every junction along the route from Simpang Jengka 21 towards Bandar Pusat Jengka (FT1533) has already been fitted with street lights.
The ministry is prepared to consider the installation of street lights at the locations in question based on technical requirements that lead to improved road safety. Several other criteria are also taken into account, including traffic census statistics and accident data from the Royal Malaysia Police to support the application. However, however, implementation is subject to the financial allocation received in due course.
So, for the information of the Honourable Member as well, for next year, namely 2026, the ministry has applied for an allocation of RM150,000 under the street lighting programme in areas with frequent accidents, at risk of accidents due to dark roads on Federal Route FT1533. So, from Jalan Rumpun Makmur to Bandar Pusat Jengka, Pahang Darul Makmur.
At the same time, continuous monitoring will be carried out by the Ministry of Works, especially at accident or accident-prone locations. So, by identifying other critical locations across the country, so that road safety aspects can always be enhanced.
So, the Ministry of Works, through the Public Works Department, is always committed to ensuring the roads remain in a safe and comfortable condition by carrying out routine maintenance throughout the year.
Thank you, that is all. Thank you.
Honourable Member, your question.
[Speaking without using the loudspeaker]
Thank you, Mr Speaker, and thank you to the Honourable Minister for the answer, which I think is quite comforting to the residents, especially regarding the confusion that I
mentioned just now. Only, as an addition, I just want to request additional attention, because it is a supplementary question, additional attention to the same road, FT98, namely near Kuala Mai, where the condition is rather rough, which is very dangerous for users.
In fact, issues like this that I bring to this Special Chamber are usually issues that have not been resolved for a long time, and we try our utmost to get the ministry's attention. So, FT98, Jalan Temerloh to Jerantut, near the Kuala Mai junction to the Kampung Gong Halt junction. Thank you, Mr Speaker.
Honourable Minister.
[Speaking without using the loudspeaker]
Thank you, Mr Speaker.
Thank you, Honourable Member for Kuala Krau, for the supplementary question. So, for the information of the Honourable Member, we at the Ministry of Works, through the agencies under it, are always committed to ensuring that the road network in Malaysia is maintained at the best standard and provides safe and comfortable services to road users.
So, the road in question is Federal Road FT98, yes, Jalan Temerloh–Jerantut, in the Parliamentary constituency of Kuala Krau, with a total length of 32.80 kilometres. So, and it is maintained by a concession company for road maintenance appointed by the government. So, for 2023 to 2024, the ministry allocated a sum of RM3.21 million under the Pavement Periodic Maintenance and Non-Pavement Periodic Maintenance Programme.
So, these works were carried out by the concession company through work orders and involved two pavement periodic works as well as three non-pavement periodic works. So, all the said works were fully completed in that year. As for 2025, the ministry has planned and prepared a Road Maintenance Estimate (APJ) involving the implementation of five pavement periodic works valued at RM5.9 million and five non-pavement periodic works valued at RM1.74 million on this route.
So, until October 2025, now — one pavement periodic work valued at RM464,000 and two non-pavement periodic works valued at RM488,000 have been approved and fully completed. So, all the remaining works that have been identified will be implemented through work orders (AK) to the concession company, subject to approval, yes.
So, the allocation by the Ministry of Finance and the priority list of works prepared by the Public Works Department are based on the assessment of the critical level of road damage across the entire Federal Road network under the supervision of this ministry.
So, this is standard, but it is information that needs to be known. So, the ministry will continue to ensure that these routine maintenance works are carried out throughout the year for the safety and comfort of road users. Thank you, that is all. Okay.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Seeking Assistance for the Community Rehabilitation Association (PPDK) Harapan Indah, Kuala KrauSpecial Chamber
Please proceed, Honourable Member.
[Speaking without using the loudspeaker]
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, I wish to draw the attention of this august House to the very worrying condition at the Community-Based Rehabilitation Organisation (PPDK) Harapan Indah, Kuala Krau, which is now facing various physical constraints and basic facilities issues.
This PPDK plays a major role as a training and rehabilitation centre for special children, not merely providing basic education, but also building self-confidence and social skills so that they can become independent and accepted in society. However, despite these noble efforts, they are struggling with infrastructure conditions that are rather dilapidated and unsafe of late.
Among the main issues that require immediate attention is the problem of toilets that are blocked and not functioning properly. On several occasions, teachers themselves have had to clear the toilet tanks with their own hands, solely to ensure the cleanliness and comfort of the children of this PPDK are maintained.
However, that effort is only temporary, because the water flow system to the main tank has been damaged for a long time.
Besides that, the condition of this building is also worrying. I have been to visit two or three times to inspect closely, and what I found was among the problems, a leaking roof causing water to drip even though I had repaired it that very day. The walls are starting to crack and the overall structure is already old. This poses a safety risk to the special children who use the facility every day.
What makes the situation worse is that PPDK Harapan Indah has only six teaching staff to manage 30 trainees, including six trainees who are bedridden at home and require continuous monitoring by these six workers.
The workload of these teaching staff is very heavy, yet they continue to carry out their responsibilities with full dedication. I have seen with my own eyes the sincerity of their efforts in carrying out this noble duty.
Mr Speaker, PPDK is not a profit-based institution, but fights on the basis of love and social responsibility.
Therefore, I request that the Ministry of Women, Family and Community Development (KPWKM) seriously consider the condition of this centre and promptly channel financial assistance. That is all.
Ya, teruskan.
Sorry. So that there is financial assistance as well as comprehensive repair work, including the piping system, roofing and other basic facilities. I also propose that the annual maintenance allocation for PPDK across the country be reviewed and continuous monitoring must be looked into to address the same problems. So, the hope for Harapan Indah is great, to become a true hope for families who have special children in Kuala Krau. That is all, Yang di-Pertua, thank you.
Menteri.
Thank you, Honourable Member for Kuala Krau, and I also extend my thanks to Mr Speaker. Mr Speaker, the Community-Based Rehabilitation Programme, or its short name PDK Programme, is a concept of social outreach for persons with disabilities (OKU) and their families together with the community. It is a community development initiative that provides a space for rehabilitation, equalisation of opportunities and social integration for persons with disabilities, or OKU.
This programme is implemented through a multisectoral approach or collaboration involving various stakeholders with the active participation of OKU, families and the local community, supported by government and private agencies as well as local leaders. The PDK Programme in fact offers specific programmes for OKU which may involve — covering aspects of health, vocational and social education according to needs and suitability as determined by the PDK organisation itself.
A PDK organisation is a non-governmental organisation under the Registry of Societies Malaysia and not a government agency under the Ministry of Women, Family and Community Development. However, KPWKM recognises PPDK as a strategic partner in safeguarding the welfare of persons with disabilities. As a registered NGO, a PDK organisation has an obligation to ensure that it is managed in accordance with the management procedures stipulated by the Registry of Societies (ROS), which also ensures that the administration, financial management and operation of the PDK organisation follow good governance and best practices.
Regarding, regarding the issue of PDK premises, it is informed that the selection of premises is made by the PDK organisation itself according to the suitability of the programmes and activities carried out. Ownership of premises is on the initiative of each PDK organisation in providing safe and suitable premises for the welfare of OKU trainees. For your information, the Department of Social Welfare (JKM) provides specific financial assistance to help ease the rental cost of PDK premises amounting up to RM3,000 a month.
At the same time, specific financial assistance to ease the utility cost burden of PDK premises is also channelled. The ministry takes note of the issue raised regarding the shortage of staff at PDK Harapan Indah. However, the PDK management guidelines have set a ratio of one staff member or supervisor to five trainees. Even
however, a PDK supervisor is also regarded as a staff member.
However, at the same time, they must carry out duties to supervise the implementation of PDK operations.
Therefore, based on this ratio, it means the existing number of staff is sufficient to handle the trainees at any one time. In addition, PDK staff are those appointed by the organisation's committee as employer. The Department has no objection to the organisation appointing additional staff according to needs and paying wages using the organisation's funds as agreed between the employer and the staff.
As support for the operation of PPDK, the government through KPWKM has allocated a sum of RM144 million in 2025 to finance 580 supervisors and 2,852 staff, as well as allowances for 20,821 OKU trainees, building rental and utility payments. Of this amount, the government has channelled a sum of RM242,413.20 to the PDK organisation Harapan Indah in Kuala Krau, Pahang. The assistance covers the payment of supervisor allowances, staff allowances, special OKU allowances and utilities. The original concept of establishing the PDK Programme is from the community, for the community.
The assistance provided by the government is a form of support and encouragement for strengthening and developing the community. As an NGO, a PDK organisation can act actively and creatively to diversify its funds or income so that it can reduce its dependence on government assistance — government finance channelled through JKM. Among the approaches that can be taken by a PDK organisation is establishing cooperation with private parties and so on in managing welfare issues. All parties can play a role, where welfare is a shared responsibility in ensuring the well-being of the people, especially for the OKU group. Thank you, Honourable Member.
Thank you, Deputy Minister, and I have no further questions.
Thank you, Honourable Member. Later I can give a copy of that answer to the Honourable Member. Thank you.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Requirement for Alternative Route and Infrastructure Improvement in Pak Mahat AreaSpecial Chamber
Assalamualaikum warahmatullahi wabarakatuh and good afternoon. Thank you, Dato' Yang di-Pertua, and also thank you to the Deputy Minister who is with us this afternoon.
Mr Speaker, I wish to draw the attention of this august House as well as the Honourable Minister to the urgent need to provide an alternative route for Jalan Pak Mahat, Kuantan.
For your information, Jalan Pak Mahat is the main access artery for more than 1,700 residential houses, covering the Flat Pak Mahat area, Taman Kempadang Sejahtera, Taman Aspen, Taman Aman Plus, Taman Kempadang Damai, Kampung Permatang Gaharu and Kampung Pak Mahat. This 1.5-kilometre road with a two-way single lane is the only main access
to the housing area concerned. The situation becomes extremely congested at peak hours, particularly in the morning and evening when parents are sending and collecting their children from school and workers are leaving for their workplaces.
The traffic light at the junction of Jalan Pak Mahat – Jalan Tanjung Lumpur also adds to the pressure on traffic flow, as vehicles are forced to queue for a long time waiting for their turn to exit onto the main road. What is more worrying is that the narrow road reserve, located close to residents' fences, makes it difficult to upgrade the existing road. If this situation is left unaddressed, the safety risk to road users will increase, especially to schoolchildren and motorcyclists who are exposed to accidents. Furthermore, new housing development in the surrounding area is expected to further increase the number of vehicles and add to the pressure on the existing road.
Mr Speaker, among the proposals that can be considered is upgrading Lorong Permatang Gaharu, which is an existing route, and connecting it to Jalan Pinggiran Putra 2 within the Residensi D'Marina area.
The second proposal is to build a new route from Flat Pak Mahat connecting to Jalan Pinggiran Putra 2. I believe further studies need to be carried out on each proposal to examine the suitability of the route for future needs.
In this case, I see that infrastructure development seems not to be given priority, even though many new housing projects are being built in this area. Therefore, I urge the ministry, together with the local authority and urban planners, to immediately review the development plan for a safer and more efficient alternative route. This study needs to assess not only the engineering and traffic capacity aspects, but also the social impact and the well-being of residents. Infrastructure development of this kind is not merely a matter of physical roads, but reflects the government's sensitivity to the comfort and safety of the people at the grassroots level. That is all, thank you.
The Honourable Minister, please.
[Speaking without using the loudspeaker]
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh.
[Reciting selawat] Mr Speaker, for the information of Mr Speaker and the Honourable Members, the Ministry of Housing and Local Government through the Local Government Department (JKT) is carrying out the agenda of strengthening and advancing physical development and the quality of life and well-being of local residents through the disbursement of allocations for small-scale BP1 projects to 156 local authorities throughout the country.
The scope of projects under the BP1 allocation covers, firstly, the socio-economic, public amenities, safety and infrastructure scope, namely works
relating to the construction and upgrading of roads, pedestrian walkways, drains and street lights which fall under the supervision of PBT only.
The ministry greatly appreciates the concern and care of the Honourable Member regarding the maintenance and alternative road infrastructure in the Pak Mahat area, Kuantan, Pahang. The area, which the Honourable Member and Mr Speaker are aware of, falls under the operation of Kuantan City Council, MB Kuantan.
For the information of the Honourable Member, the proposal to upgrade the Kampung Permatang Gaharu lane connecting to Jalan Pinggiran Putra 2 is through Lorong Pinggiran Putra 2/2, Residensi D'Marina.
This proposal is a project under the Pahang State Development Office, and Residensi D'Marina is a Phase 2A project that was completed in May 2025, involving 136 units of two-storey terrace houses.
However, Honourable Member, there is a letter of objection from the residents of Residensi D'Marina addressed to the Most Honourable Menteri Besar of Pahang through the residents' association, signed by 62 persons. The justifications for their objection stated include the safety factor of a residential area being unsuitable for use as a main public route, health factors due to noise and air pollution, and the depreciation of property value.
For the information of the Honourable Member and also Mr Speaker, based on the planning scheme for the whole Flat Pak Mahat area, MB Kuantan found — Kuantan City Council found that there is a valid road reserve, legal access, with a width of 66 feet behind Flat Pak Mahat connecting to Jalan Pinggiran Putra 2, which will become the alternative road in the area.
Again, however, the construction of the road is expected to be implemented only in 2029, based on several factors that I will mention, Honourable Member. First, there is an existing project in the area in which the developer, Citaglobal Property Development Sendirian Berhad, also known as Sinergi Dayang Sendirian Berhad, is completing an 800-metre road in the Phase 2 area, namely Phase 2A which has been completed and Phase 2B which is under construction.
However, there are Phases 2C to 2F which have not yet begun construction, and once that project is completed, the plan to connect the road to Flat Pak Mahat can be implemented by Kuantan City Council.
Honourable Member, this is related to the Planning Permission because the Planning Permission covers all the projects. So far, 2A and 2B have been completed. Meanwhile, 2C to 2F are still in planning, yes.
And secondly — the second factor is that it requires a large-scale project allocation, where Kuantan City Council will submit an application for a large-scale project allocation to this ministry, and the estimated cost involved is RM1.5 million, which exceeds the allocation permitted under BP1. BP1 is only RM1 million and below, Honourable Member.
And the 350-metre stretch involving the road connection works by Kuantan City Council from the Residensi D'Marina area to the road
housing area adjacent to Flat Pak Mahat. The scope involved is as follows:
(i) measurement works;
(ii) subgrade filling works;
(iii) construction of the road structure consisting of a sub-base layer of fine gravel and sand, a base layer of coarse gravel and a surface layer, as well as a drainage layer if the groundwater level is less than 300 millimetres below the surface of the subgrade, to prevent saturation of the pavement layers;
(iv) road markings;
(v) road signage;
(vi) street lights; and
(vii) sewerage drainage system structures and also bridges.
Based on the question raised by the Honourable Member just now regarding the road infrastructure upgrading project, the ministry greatly appreciates it. I repeat once again that we truly appreciate the Honourable Member because with the cooperation of all of our Honourable Members, we can work together to give the best to the people.
Therefore, Kuantan City Council may submit the proposal together with the project details for due consideration by the ministry. For large-scale projects, the ministry must table the application through the Second Rolling Plan, Thirteenth Malaysia Plan 2027, for consideration by the Ministry of Economy. Thank you, Mr Speaker.
Thank you, Mr Speaker, and also thank you to the Deputy Minister who gave a detailed reply. So for the information of the Honourable Minister and the Members of the House, at this moment, the area is experiencing rapid development. This means that on that route, everyone converges, and in the morning it really takes a long time to get out and so on. And I myself did not receive any information regarding objections from residents as just stated.
And secondly, there is the alternative route that the Honourable Minister answered, namely in 2029 as in the answer just now. And also, if we look here, I want to record as well that Kuantan City Council should make the considerations stated by the Honourable Deputy Minister, so that they apply as explained. Let us record it in this Special Chamber so that this matter can be resolved for the future.
Also, one more thing, finally, I would like to raise a question that the Kuantan–Inderapura route was not included in the original question.
Perhaps we can get a written answer. In fact it is only nearby, it is separated only by one river from Pak Mahat to Taman Seri Inderapura.
So, for example, if in future the planning scheme could connect that route, then residents from the town, from Inderapura, would not need to pass through the Sungai Soi route and also the Permatang Badak route to continue to Kuantan city, and the congestion at peak hours in the morning and also in the evening could be reduced. So, I request the views of the Honourable Deputy Minister.
Mr Speaker, may I begin, Mr Speaker?
Honourable Member, Standing Order 17 is specific. If the Honourable Member raises it, it must be in black and white, a report. So, interjecting. It is up to the Honourable Deputy Minister whether to answer or not, it is fine either way. [Speaking without using the loudspeaker]
Alright, I appreciate the advice and guidance from Mr Speaker. Regarding what I mentioned earlier, that Kuantan City Council may submit that application, Honourable Member. In fact, as the Honourable Member for Kuantan, the Honourable Member can also inform them that, as a result of our feedback here, in the Special Chamber, the City Council may submit that application. As for my officers, they will take note and will also advise on the same matter.
As for what the Honourable Member asked earlier about the Inderapura route, we will also study it closely, God willing. Thank you, Mr Speaker.
Teruskan Setiausaha.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Need to Upgrade Kuala Kempadang – Kampung Anak Air Road, KuatanSpecial Chamber
Assalamualaikum and good afternoon. Thank you, Mr Speaker. Thank you to the Deputy Minister for being present this afternoon. Mr Speaker, for the information of Mr Speaker and the Honourable Minister, the Lorong Anak Air 2 to Jalan Kuala Kempadang route, approximately three kilometres long, is a route for local residents, particularly parents who send their children to Kempadang National School.
In addition, this route also serves as the main access to recreational and tourist areas, namely Pantai Anak Air and Pantai Kempadang, which are increasingly popular with local and non-Kuantan visitors.
This route is a village road, narrow and not wide, thus causing difficulties for users. When two vehicles pass each other, one of them has to stop to give way. This situation becomes more critical when public programmes and events such as kite-flying competitions, sports activities and cultural activities are organised in the area.
Therefore, I would like to request the ministry's consideration so that this route can be upgraded and widened to ensure the safety and comfort of road users. This upgrading will not only benefit local residents, but also increase the potential of this area as a major tourist destination in Kuantan, thereby contributing to local economic development.
In addition, I would like to inform you of the condition of the road and bridge that are damaged on the Jalan Kuala Kempadang route. There are bridge sections that are broken and potholed, which endanger road users. Furthermore, there are many road locations that are damaged, broken, potholed and uneven along this route.
This matter has been raised in the district action meeting but until now there has been no follow-up action. Therefore, I request that this matter be given serious attention and be repaired urgently.
Mr Speaker, for the information of the House, Kuantan is very fortunate to be endowed with a long, clean and beautiful coastline, covering areas such as Pantai Anak Air, Pantai Kempadang, Pantai Cempaka and Pantai Sepat. However, the routes between these beaches are still not directly connected, causing visitors to have to use separate routes to reach each location. For example, to reach Pantai Cempaka and Pantai Sepat, users have to go through different routes.
In this regard, I propose that a new route be built to connect the coastline from Pantai Kempadang to Pantai Sepat. The construction of this route will not only facilitate access to beach recreational areas, but also has the potential to become an alternative route to reduce road congestion, especially on weekends and holiday seasons.
I sincerely hope that the ministry can study this proposal thoroughly in an effort to improve tourism infrastructure, strengthen the local economic sector, and make the Kuantan coastline a major tourist destination of the state of Pahang. That is all, thank you.
The Honourable Minister, please proceed.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker. Thank you to the Honourable Member for Kuantan for the question. Mr Speaker, the Ministry of Rural and Regional Development (KKDW) takes note of and greatly appreciates the Honourable Member's concern regarding the issue of the narrow village road from Jalan Kuala Kempadang to Kampung Anak Air, Kuantan. And the proposal for a new route to connect the beaches and from Pantai Kempadang to Pantai Sepat.
For the information of the Honourable Member, the ministry welcomes both proposals and they are in line with the objective of the rural road programme under KKDW, namely to provide more complete, comfortable and safe infrastructure for transport connectivity in any
weather, for more inclusive socio-economic development, for increased income and improved standard of living of residents in rural areas.
At present, there are several projects that we have approved under KKDW to improve road infrastructure in rural tourist areas, among them building a road and bridge from Kampung Pantai Senok to Kampung Pulau Gajah, Bachok, Kelantan, and the project to build a road from Pantai Dendong to the back road of Bukit Keluang Besut, Terengganu. Both of these projects aim to connect tourist areas and facilitate access for the public in order to attract more tourists.
The ministry's review found that the upgrading project for Jalan Kuala Kempadang to Kampung Anak Air, Kuantan, and the proposal for a new route connecting the beaches and Pantai Kempadang to Pantai Sepat, are not listed. In the priority list of Pahang state projects under the RP1 RMK13 that was previously applied for by the State Economic Planning Unit, BPEN Negeri Pahang.
Therefore, the ministry recommends that the Honourable Member forward this project application to BPEN Negeri Pahang for further consideration for new project applications to the ministry in the upcoming rolling plan. Thank you.
The Honourable Member's question.
Thank you, Mr Speaker. Thank you also to the Honourable Deputy Minister for the comprehensive answer — so that it can be heard by the local people. So, when the complaint given to me relates to the bridge, firstly relating to the bridge, I did not have time to mention it earlier because I came in early.
If we look at this diagram. [Showing a picture] The bridge is in a dilapidated condition, in a dilapidated state. So, we also ask that, what is it called, I will also send an application or send it to BPEN as the answer just now stated was not listed, and God willing, with our record today we will send it to BPEN for a repair proposal.
And I also request that matters relating to this bridge be considered, if possible, for widening and extending the road, which would require a large cost and also more detailed planning.
Perhaps for this bridge, we can look at how to repair the edge wall first, or slightly widen it, the holes or the potholes on top of the bridge to be repaired first, or how.
And furthermore, I also hope that this bridge — this road can be connected, because at peak hours on Saturdays and Sundays, vehicles rush to Pantai Sepat on this main road. So, local residents cannot get out because, what is it, the congestion. So, if there is an alternative road like in the planning scheme that we are trying to apply for.
With this, local residents can also do business, improve their economy, and tourism activities in Kuantan itself will rise, namely the long coastline. So, we ask for the views of the Honourable
Deputy Minister, the most important thing is the bridge we mentioned earlier.
Thank you.
Thank you, Dato' Speaker.
Thank you, the Honourable Member for Kuantan, for the supplementary question just now. For the information of the Honourable Member for Kuantan, based on the ministry's check, the existing road, namely the road from Kampung Kempadang to Kampung Anak Air, Kuantan, has been registered as a village road and has been entered into the MARRIS system.
Maintenance work should be able to be carried out by the district office or the District JKR under the MARRIS allocation that we receive every year. For the information of the Honourable Member, our ministry does not have any special programme or any projects at all to maintain roads that have already been registered under MARRIS. So, the only allocation that can be applied for is MARRIS.
So, there are two ways to apply for MARRIS. One is to the JKR, to the JKR.
The second, if the road is under the PBT, you have to request it through the PBT because the PBT also receives MARRIS allocations, or directly to the State Financial Secretary because the allocation is also distributed through the state government. That is how to obtain an allocation for repairing roads that have already been registered under MARRIS, yes.
Apart from that, regarding the allocation for repairing the bridge mentioned earlier. For the bridge, my advice to the Honourable Member is to apply for this allocation to the Ministry of Rural and Regional Development (KKDW), because under KKDW we have the Social Amenities Programme. But this programme must be applied for, and usually applications from each state are coordinated by the State PKN.
Apart from that, the Honourable Member can also apply for an allocation to repair the bridge under the Implementation Coordination Unit (ICU), Prime Minister's Department.
This is my own experience, Honourable Member. We can also apply for a special allocation under the ICU. And now we also have another opportunity, Honourable Member, namely the Rakyat Facilities Initiative (IKR) programme under the Ministry of Economy, where the allocation approved is below RM200,000. For me, if the bridge is not [Inaudible], the applicant for this application must be from — not from the JKK committee but the Honourable Member himself can apply. That means from an individual, if IPKR — through the IKR. For me, this is quite easy.
However, the application must be carried out. I dare not give a commitment here because each state already has an allocation for PEMS, where PEMS applications are coordinated by the state government. That means the State PKN, not the state government. The State KKDW Office.
So, regarding planning — that relates to the bridge. This is what people call our advice. Regarding that name, the road earlier, once again I ask the Honourable Member, because the intention is already there, a good intention. Indeed, our aim is to connect areas that have a great impact on the local community, while also helping to provide facilities to rural communities.
So, the application for this Rural Road Project must be submitted, as they say, according to the procedure set by the state government. For the information of the Honourable Member, even if you apply with me, we will refer it back to the state government. Because from — beginning last year, enforcement has been implemented whereby every project must go through the MyProjek system, which is filled in by the State UPEN or the State BPEN, yes.
The State Planning Division, which covers the project name, project impact, project costing, and project land. Because we do not want any more issues from the implementation side as before. When the project — its briefing paper is unclear, and there is no cooperation from the state government, which causes that when the project is approved, many issues and problems arise, not only for the applicant but also in the relationship between KKDW and the state government, which makes things difficult for us.
So that is why we propose that the project already has a good intention and provides facilities for the local community, which can bring not only facilities but also economic returns or impact to the local community. It would be best for this project to be applied for according to the set procedure, namely through the State UPEN or State BPEN. Thank you, Mr Speaker.
Dato' Speaker, may I just say thank you. Okay.
[Laughter] Thank you. Thank you, Dato' Speaker, for being so kind this afternoon too. So, I also thank you for the explanation. I too learned something, I admit I gained several points this afternoon, and as explained in the earlier session, the Special Chamber as well, where the MARRIS allocation has been given based on the total length of roads in the state, right.
So, perhaps there is no problem if applications through MARRIS are implemented or carried out, and those who lodged complaints with me can also hear the answer from the Minister himself. And, God willing, we hope that with this answer and also with the cooperation of the state government itself, this problem can be resolved.
That is all, thank you. Thank you once again.
That one must go by road first. If the Honourable Member can coordinate with the Pahang road exco, God willing.
Good. Honourable Members, with that, the Special Chamber session for today is concluded. Today's Special Chamber is adjourned until Thursday, 13 November 2025, at 2.30 pm.
[The Special Chamber was adjourned at 3.24 pm]