Dewan Rakyat · 17 November 2025

15th Parliament, session 4, meeting 3 · not final · 559 turns · 52,979 words · official PDF ↗ · Digital Hansard ↗

527 of 559 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor) chaired the Sitting]

Oral QuestionsQuestions

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Bismillahirrahmanirrahim. Assalamualaikum and good morning, Honourable Members. We begin today's sitting with oral questions, and I now invite Ir. Ts. Zahir bin Hassan, the Honourable Member for Wangsa Maju.

Tuan Ir. Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Thank you, Dato' Yang di-Pertua. Since today is Monday, the first question will be answered by the Ministry of Works (KKR). Allow me to read a pantun.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Silakan.

Tuan Ir. Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Strolling to Kuala Lumpur, Seeking a livelihood every day; MLFF is a noble system, What is its progress, Minister. Wangsa Maju question number 1.

Zahir bin HassanPKR · PHWangsa Maju · questionEN

1. Ir. Ts. Zahir bin Hassan [Wangsa Maju] asks the Minister of Works to state: (a) the evaluation parameters for the pilot implementation of Automatic Number Plate Recognition (ANPR) and the latest developments in the use of the JustGO application on toll highways; and

(b) metric standards for assessing time reliability (time reliability), including 95th percentile travel time, Buffer Index and Planning Time Index, in the implementation of MLFF.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister of Works, please. This pantun must be answered with a pantun, Honourable Member.

[Dewan ketawa]

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

Assalamualaikum warahmatullah. [Laughter] Roads, roads, full of bumps, On a morning, its beauty is an illusion; To question number one, Listen to this answer. So, Dr. Yang di-Pertua. Thank you, Wangsa Maju. At present, the toll collection system of Open Payment (Secara Pembayaran Terbuka, SPT) has already been implemented on 26 highways, an open toll system that uses payment methods through bank cards and prepaid cards. This open toll system, Dato' Yang di-Pertua, when you arrive there you pay immediately. In a closed toll system, we tap, and then when you reach your destination, you pay. That is the difference between open and closed. Open systems are usually in cities. The Ministry of Works (KKR) and the Malaysian Highway Authority (Lembaga Lebuhraya Malaysia, LLM) have received a proposal from PLUS Berhad to implement the SPT system, yes, on closed toll highways. The method proposed by PLUS is to use automatic detection of vehicle number plates, in English, with permission, automatic number plate recognition, linked to the JustGO system, an application under PLUS for toll payment purposes. The SPT proposal using ANPR enables the number plates of highway users passing through toll lanes on closed toll highways to be identified automatically, and toll payment is made digitally through the application. This proposal is in line with the direction towards digital transformation of national infrastructure, providing a more efficient toll system, and in addition can smooth toll operations. Several evaluation parameters have been determined by LLM for the implementation of the public pilot of the SPT toll system using ANPR. Among them are the following: (i) ensuring the use of a high-capacity ANPR system;

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

(ii) improving transaction speed; and (iii) ensuring the security and transparency of the system. And the JustGO application on highways is still at the testing stage. The implementation of the MLFF toll collection system, multi-lane fast flow, is a government initiative, among others, to eliminate travel obstacles and bottlenecks, and what— causing a lack of additional toll lanes due to the limited toll plaza areas. The MLFF system is designed taking into account 100 per cent savings during toll payment, compared with existing toll collection methods. KKR acknowledges the need for a study of metrics and time reliability to obtain a picture of the real impact, in order to assess other critical obstacles after the absence of toll plazas on highways for toll payment purposes. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Supplementary question, Honourable Member for Wangsa Maju.

Tuan Ir. Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Thank you, Dato' Yang di-Pertua. Thank you, Deputy Minister. We know that the existing system requires toll plazas to exist, and we also know that several accidents have occurred at toll plazas. For example, at the Sungai Pulai Toll Plaza, in 2023, six injured. Sungai Dua Toll Plaza, one died, two seriously injured. Teluk Panglima Garang Toll, SKVE, September 2025, and the latest toll plaza, Bukit Kajang Toll Plaza, two killed, six others injured. So, these accidents continue to happen at toll plazas, and moving forward, with permission, this matter has been delayed for a long time, long overdue, and moving forward, how, what is the plan and what is the timeline of the government to ensure that all 33 highway concession holders migrate from the existing system to MLFF? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, please.

Yes, that's right. There are problems.

The first problem is the bottleneck at toll plazas, especially during festive periods and weekends. The second is accidents. As mentioned just now at Tol

Bukit Kajang, for example, there was an infant and another staff member of JKR (Public Works Department). I went to that staff member's house and met the wife and child, yes. So, that is one matter. The Cabinet has agreed to MLFF (multi-lane fast flow). Previously it was called multi-lane free flow, Dato'. But if it is "free", people will not pay. So we changed "free" to "fast", and the Cabinet agreed without government involvement. Second, it is a B2B (business-to-business) model. But Dato', we have to amend the law. Ah, that is what causes the delay, and the amendment of the law may be next year. Akta Jalan Persekutuan, Akta Pengangkutan Jalan, Akta LLM. What are among the matters to be amended? That is, the offence of not paying tolls. Well, the toll barriers are gone. They will just pass through, and eventually they won't pay, and so on. We need to have that. And one more thing: who is going to implement it? Most likely LLM will implement the enforcement on who does not pay tolls, under the act to be amended, and these three acts will be amended next year so that MLFF can be implemented. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member for Kapar, please.

Dr. Hajah Halimah AliPAS · PNKaparEN

Thank you, Deputy Speaker. I have examined the recommendations issued by the Public Accounts Committee (PAC) regarding the implementation of the multi-lane fast flow (MLFF) system. My question is: has the ministry determined the concession companies involved in this project, and what is the estimated cost of implementation using the B2B (business-to-business) model? Is there also a review of the original cost, which was more than RM3 billion? And what charges will be borne by highway users if this model is fully implemented, and what efforts are being made by the ministry to protect the interests of users? Please explain.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, please.

Yes, there is a PAC report, and of course we are aware of that matter. And the RM3 billion, Dato' Yang di-Pertua, no longer exists, because that RM3 billion would have applied if it were implemented by the government. But since it is now being implemented by the concessionaires on a business-to-business basis,

then no cost involving the government arises anymore. So, the RM3 billion no longer exists. How much is the concession cost? It must select a system. Certainly, the system chosen must be truly competitive, yes, and this matter is to ensure that users do not face additional charges, as far as possible no additional charges, and we hope the interests of users will always be taken care of. This MLFF is not only for the interests of users, Dato' Yang di-Pertua, because we do not want to travel far on a good highway and suddenly be jammed for hours at toll plazas. But if we demolish the toll plazas and only have gantries, tall poles to place the system, what is called ANPR, and thereafter when there are related systems, hopefully we will no longer have jams on long journeys when we install this new system. However, it will only be implementable next year, after the three matters I mentioned earlier, Akta Jalan Persekutuan, Akta Pengangkutan Jalan, and Akta Lembaga Lebuhraya Malaysia, are amended, which relate to MLFF or multi-lane fast flow. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Datuk Seri Dr., Deputy Minister of JKR. Congratulations. Okay. Next, we move to the second question. I invite Mr Shaharizukirnain bin Abd Kadir, the Honourable Member for Setiu.

Thank you, Dato' Yang di-Pertua. Assalamualaikum, question number 2.

Shaharizukirnain bin Abdul KadirPAS · PNSetiu · questionEN

2. Mr Shaharizukirnain bin Abd Kadir [Setiu] asks the Minister of Transport to state the main constraints hindering the establishment of the Malaysian Transport Safety Board (MTSB), which has been proposed for almost 11 years, given that the road accident rate remains very high, thereby strengthening safety aspects in the transport sector.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Minister of Transport, please answer.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Greetings, Honourable Members.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Mr Speaker, for the information of the Honourable Members, the proposal to establish the Malaysian Transport Safety Board (MTSB) has been discussed since 2014. However, it was only agreed to by the Cabinet in November 2017. Its implementation takes into account various aspects. Among them are the following: (i) coordination among the acts and regulations of other agencies and departments involving the land transport sector, road and rail, air, maritime and also logistics; and (ii) the need to ensure independence of investigation in line with ICAO, IMO and other global safety standards; and comparison with international bodies carrying out accident investigation functions, and ensuring that the model to be implemented is suitable for the transport sector in Malaysia. Nevertheless, the proposal was not implemented due to several factors, including the change of government requiring updated policy decisions, the dissolution and restructuring of existing agencies under MOT, and overlapping powers of accident investigation agencies. Since June 2025, the Ministry of Transport has arranged the latest steps to achieve the target of establishing MTSB. Throughout May to October this year, MOT has conducted engagement sessions with agencies and stakeholders. MOT will also hold engagement sessions with the Sabah and Sarawak State Governments, workshops on proposed staffing, refinement of the draft Bill and amendments to laws. The memorandum on the proposal to establish MTSB will also be tabled at the Cabinet Meeting in the near future. The tabling of the MTSB Bill is targeted to be presented in Parliament after obtaining Cabinet approval. Until the MTSB is established, the ministry will continue the mechanism for setting up special accident investigation committees, such as those for the accident involving FRU personnel in Teluk Intan and the UPSI student bus accident in Gerik, Perak. This ad-hoc platform consists of committee members comprising experts. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, supplementary question. Please.

Okay, thank you, Minister. My supplementary question: does the ministry have a timeline for finalising the establishment of this MTSB? And does the ministry intend to make this MTSB an independent agency in conducting investigations and monitoring transport safety, as done in Australia, namely the one called the Australian Transport Safety Bureau? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister.

Tuan Loke Siew FookDAP · PHSerembanEN

Firstly, in terms of the timeline, as I said, the Cabinet Memorandum on the establishment of MTSB will be finalised in the near future, and I hope it can be brought to the Cabinet before the end of this year. Immediately after that, once in-principle approval is obtained, the draft Bill can be implemented by the AGC, and we then hope to bring the Bill back to this Parliament to be tabled next year.

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

Tuan Loke Siew FookDAP · PHSerembanEN

As for the MTSB model, that has not yet been finalised. As I said, we also take into account views and comparisons with international agencies abroad. Certainly we will take into account the best practices of those agencies. And of course, any investigation agency certainly has independence. In fact, the task force we have now formed is free to carry out any investigation and make any recommendations. And in terms of the ministry, when the report is completed, it will not be edited, no amendments will be made, and it will be tabled openly, as I have already done. You may ask the Honourable Member for Jerantut what they decided in the report; we table it generally, openly, for public viewing. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Minister. Honourable Member for Batu Pahat, please.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Thank you, Dato' Deputy Speaker. My supplementary question to the Minister. We understand the accident rate is very high every year. There are estimates of 5,000 to 7,000 a year, involving economic losses of billions every year. So my question to the ministry is: is there a plan for the ministry to create an immediate action plan before establishing this MTSB? And how will it operate if it is established? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Silakan Menteri.

Tuan Loke Siew FookDAP · PHSerembanEN

Mr Speaker, for the information of the Honourable Member for Batu Pahat, indeed many actions have been taken. Not only plans, but actions that have already been taken.

Tuan Loke Siew FookDAP · PHSerembanEN

As I have stated in this honourable House, before the establishment of MTSB, many task forces have indeed been set up in the past for several major accidents, and we also follow the recommendations of those reports. Some have already been implemented, including making it mandatory to install SLD, speed limitation devices, on heavy vehicles, especially tour buses, express buses and so on, and also other heavy vehicles. That is being implemented now. We have indeed enforced this, and some vehicles have been inspected. If they no longer have SLD, enforcement action will be taken. Likewise, we are taking a very firm enforcement action on the issue of lorry overloading, and some drivers are dissatisfied, but we continue the enforcement because it is important for protecting public safety. In terms of our engagement and awareness campaigns on safe driving, especially among motorcyclists, these continue. These are campaigns conducted on an ongoing basis. We do not wait for the establishment of MTSB before taking intervention action. Intervention action is indeed being implemented very actively by the Ministry of Transport and its agencies, especially by the Road Transport Department (JPJ) and by the Malaysian Institute of Road Safety Research (MIROS)

Tuan Loke Siew FookDAP · PHSerembanEN

and so on. So, this is something I feel we need to continue even before the establishment of MTSB. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

We move on to the third question. I invite Mr Suhaizan bin Kaiat, the Honourable Member for Pulai.

Tuan Suhaizan bin KaiatAMANAH · PHPulaiEN

Thank you, Dato' Deputy Speaker. Pulai question number 3.

Suhaizan bin KaiatAMANAH · PHPulai · questionEN

3. Mr Suhaizan bin Kaiat [Pulai] asks the Minister of Home Affairs to state the readiness measures and strategies of the government to ensure national peace, particularly to prevent public unrest such as that in Indonesia and Nepal, which arose from cost-of-living pressures, dissatisfaction with government policies, and social and political issues.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Minister of Home Affairs, please answer.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Bismillahirrahmanirrahim. Dato' Dr. Yang di-Pertua, my friend from Pulai. The government always takes a proactive approach so that public unrest such as that in Indonesia and Nepal, which arose from cost-of-living pressures, dissatisfaction with government policies, and social and political issues, does not occur in our country. Among the measures and strategies implemented to ensure that national peace remains preserved are as follows. We strengthen and gather information and monitor every issue through intelligence monitoring by the Royal Malaysia Police (PDRM). This is to identify potential threats to the peace and stability of the nation. We are enhancing collaborative approaches with government agencies, civil society organisations and non-governmental organisations, so that issues related to cost of living, dissatisfaction with government policies and related issues can be addressed comprehensively and not manipulated by irresponsible parties. Besides that, Honourable Member, we hold discussions between PDRM and the organisers to ensure that the holding of assemblies does not lead to or trigger threat issues and jeopardise public security and order, and we raise the level of preparedness through riot control training emphasising discipline, minimum use of force, compliance with riot control

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

SOPs, deployment of special forces, and the use of modern technology such as body cameras, drones, monitors and CCTV systems to increase the efficiency of monitoring and response. Thank you, Yang di-Pertua.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member for Pulai, supplementary question, please.

Tuan Suhaizan bin KaiatAMANAH · PHPulaiEN

Okay. Thank you, Dato' Deputy Speaker, and also thank you to the Deputy Minister. We are aware of the intelligence and so on, yes, and the government also does not prevent demonstrations held in our country. And now we even make it easier to arrange these gatherings, yes. My question is, in this regard, there is room for extremist groups to exploit these sentiment issues among the people, yes. So, is there any new capacity and intelligence strategy to obtain information earlier, before the incident happens? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, to answer.

Thank you, the Honourable Member for Pulai. We are aware of the changes that have taken place. Certainly, the Royal Malaysia Police (PDRM) is increasing its capacity to cope with the changes and challenges that are occurring. That is why the matter of intelligence is so important, and PDRM itself is increasing its intelligence capacity so that we can detect early the planning of extremist elements that seek to exploit public sentiment, by using information-gathering methods through intelligence, monitoring social media, and strategic cooperation with local and international agencies, for example with MCMC, with INTERPOL and also ASEANAPOL. The main approach used in detecting early planning is by identifying the sentiments that exist based on issues on social media platforms or matters that are hot topics of conversation among the general public. Among the sentiments identified in reducing the exploitation of public perception are such things as double standard enforcement and other matters. Honourable Member, in drafting action to diffuse issues and address negative public perceptions of the government, there is strategic collaborative action by the ministry among the enforcement agencies involved, while we also maintain close cooperation with NGOs, associations, and education and religious elements.

In other words, while the government gives people freedom of rights, matters of security remain our primary attention. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Minister. I invite the Honourable Member for Kota Bharu.

Thank you, Mr Speaker. Thank you, the Honourable Minister. I wish to ask a few questions, two questions for this supplementary question. Firstly, we cannot deny that in our country, at one time, Honourable Tan Sri Mr Speaker, there was indeed a history of public disorder. For example, those related to the 13 May political issue, those related to economic issues, poverty, the Baling demonstration, and also land seizures in Selangor and in Johor. However, as the Honourable Minister also mentioned earlier, we now have an act, Act 736, the Peaceful Assembly Act 2012, in which this act does set out several conditions for a peaceful assembly to be held, particularly in this act, section 9(1): “Organisers shall seven days before the date of the assembly notify the officer in charge of the district, OCPD, regarding the assembly”. But in the same section, there is also a clause stating that failure by the organiser to notify the OCPD is an offence that can be punished, if convicted, with a fine not exceeding RM10,000. What I want to mention today is that this section 9 has been challenged in court, challenged by a person named Amir Hariri bin Abdul Hadi, who challenged section 9(5) as a provision that is unconstitutional, not in accordance with the Constitution. And this case was heard by the Chief Justice of Malaysia at that time, Tun Tengku Maimun, and the court declared― I seek permission to read, “Section 9(5) of the Peaceful Assembly Act 2012 is a sudden and disproportionate attack on the right to peaceful assembly.”

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, your question.

I want to come to my question.

Deputy Speaker (Dato' Ramli bin Dato' Mohd Nor)

Tolong.

And this case was decided that section 9(5) is unconstitutional by the Federal Court. My question

to the government is, what has the government done following this decision? Now, section 9(5) is still in Act 736 and is still being used. Anyone who wants to hold an assembly must make an application or must notify the OCPD; if they do not, they can be arrested and charged in court.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, your question.

So, the question is, what has the government done regarding this matter? Secondly, why are peaceful assemblies held under this act still facing problems? For example, students at Universiti Malaysia Sabah were arrested and detained when they held an anti-corruption demonstration in Sabah, and were then charged or investigated under the Sedition Act. So, I ask why this has happened within the Ministry of Home Affairs. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Thank you, Mr Speaker. Nevertheless, Honourable Member, we greatly respect the decision made by the court. This is very clear. Honourable Member, the old rule was seven days before, but the new rule is five days before. All of this we are aware of. Whatever it is, Honourable Member...

Previously it was 10, now it is seven. Let me correct: previously 10, now seven.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, do not interrupt. The Honourable Minister, please.

Honourable Member, I said earlier that the new one requires an application five days before, and previously seven. Honourable Member, whatever I want to say, I have said and stated earlier that in circumstances where the government gives people the right to assemble, and we respect the process and the decision made by the court, the government, through the Royal Malaysia Police, will continue to carry out intelligence and monitoring so that issues and matters that violate the rules can be addressed well and in an orderly manner.

Whatever it is, I want to clarify here that any action taken by the police remains consistent and always complies with the existing rules and laws, and will never violate those rules, because PDRM itself strictly adheres to all the SOPs set out so that we respect the rights of the people, and at the same time we must maintain the peace of the nation. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Good, the House moves to the fourth question. I invite Ir. Ts. Haji Khairil Nizam bin Khirudin, the Honourable Member for Jerantut.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, and greetings of peace. My question is number 4.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

I invite the Minister of Investment, Trade and Industry (MITI) to respond.

Khairil Nizam bin KhirudinPAS · PNJerantut · questionEN

4. Ir. Ts. Haji Khairil Nizam bin Khirudin [Jerantut] asks the Minister of Investment, Trade and Industry to state the total number of highly skilled engineers who have been trained and absorbed into the semiconductor industry since the launch of the National Semiconductor Strategy (NSS), and the level of cooperation of multinational chipmakers with public universities to meet the manpower needs of the industry.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

Thank you, Mr Speaker. Thank you to the Honourable Member for Jerantut. Mr Speaker, since the launch of the National Semiconductor Strategy (NSS) in May 2024, the development of highly skilled talent has been identified as a critical pillar in ensuring the sustainability and long-term competitiveness of the nation's semiconductor industry. To date, a total of 13,679 engineers and technical skilled workers have been successfully trained, certified in their skills, and absorbed into various segments of the semiconductor industry. This achievement signifies that Malaysia is on a solid footing to achieve the target of 60,000 highly skilled talents by 2030, covering the fields of integrated circuit design (IC design), advanced packaging, wafer fabrication, and related Research and Development (R&D).

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

Among the universities and institutions involved in this effort are USM, UM, UTM, UPM, Universiti Teknikal Malaysia (UTeM) and Universiti Malaysia Perlis (UniMAP), as well as skills centres such as MIMOS, Advanced Semiconductor Academy of Malaysia (ASEM-Sidec) and Penang Skills Development Centre (PSDC), Penang Chip Design Academy InvestPenang, SMD Chip Design Centre and Academy, Pusat Latihan Teknologi Tinggi (ADTEC) and Kedah Industrial Skills & Management Development Center (KISMEC). CREST, an agency under MITI, together with the Human Resource Development Corporation (HRD Corp), has also signed a Memorandum of Understanding (MoU) on 24 July 2025 to form a strategic partnership in talent development under the NSS framework. Through this collaboration, the Engineering Talent for Semiconductor Industry (ETSI) programme, led by CREST, aims to upskill 15,000 students of higher learning institutions, graduates, industry workers and researchers to drive innovation and strengthen Malaysia's global competitiveness. Other initiatives include the MyMAHIR Future Skills Talent Council (FSTC), established by the Ministry of Human Resources (KESUMA) through TalentCorp for the electronic and electrical (E&E) sector, with the objective of aligning talent development with the needs of the semiconductor industry. Under Budget 2026, several talent development initiatives for the semiconductor sector were announced. Among them, HRD Corp will offer three million training opportunities with a focus on high-technology sectors including semiconductors. The K-Youth programme and TVET training by Khazanah will continue to provide work-based training to 11,000 youths without degrees in strategic sectors such as semiconductors, with an allocation of RM200 million. The Flagship IC Design Programme will continue to train 2,500 world-class talents in the field of integrated circuit design (IC design) with a value of RM340 million. The Perbadanan Tabung Pembangunan Kemahiran (PTPK) received an allocation of RM650 million to finance TVET skills training, benefiting more than 25,000 trainees, especially in high-technology fields such as semiconductors. A sum of RM5 million has been allocated to train teaching staff in the field of semiconductors at ADTEC Taiping, Perak.

Tuan Liew Chin TongDAP · PHDeputy Minister of Investment, Trade and Industry · Iskandar PuteriEN

In addition, several major multinational companies in the fields of chip design, fabrication and testing, or testing and validation, have actively forged strategic collaboration with public universities. This cooperation involves the development of industry-based curricula, the provision of high-technology laboratories, the Industry Attachment programme, and joint efforts in applied research focusing on next-generation semiconductor technology. This approach not only ensures the sustainability of the skilled workforce chain but also enhances Malaysia's capacity to become a regional hub for world-class semiconductor human capital development. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Minister. The Honourable Member for Jerantut, supplementary question.

Thank you, Mr Speaker. Thank you, the Honourable Deputy Minister. We understand that there are five main targets for the National Semiconductor Strategy (NSS), among which is to attract RM500,000 in investment, and among them is for us to produce 60,000 highly skilled engineers. My question to the Deputy Minister is whether the ministry tracks how many engineers who have been trained then migrated overseas, particularly to the wafer fabrication companies mentioned by the Deputy Minister earlier, in Taiwan, in Singapore or in Europe. So, if there is a Deputy Minister, what is the ministry's intervention strategy to ensure we can reduce this talent leakage? That is the first. The second is how about the issue of mismatch between training and the needs of companies, so that we can achieve the target of 60,000 highly skilled engineers for this NSS?

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Thank you, Honourable Member for Jerantut. I do acknowledge that there are situations where talent leakage occurs. I was informed by the Vice-Chancellor of USM...

[Bangun]

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

That of the 10 graduates we train in the semiconductor field, perhaps only three remain in our country after three or four

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

years — three, four, five years. While they are graduates, three are already prepared to work in Singapore. So, this issue is actually a salary issue. This is not another issue, this is a salary issue. So, we as a nation, as a government, together with society and the economic community, must be prepared to provide more reasonable salaries to them in high-technology sectors. This is the most important issue. In terms of mismatch, actually there is not much mismatch in semiconductors. Most trained graduates get jobs, not in Malaysia but in other countries. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

I invite the Honourable Member for Balik Pulau.

Thank you, Deputy Speaker. In the semiconductor industry in Malaysia, we are known only for assembly and testing, but the main value creation, Honourable Deputy Minister, lies in the field of IC design. You know, as mentioned earlier, IC design, mask design, packaging engineering.

Does MITI have a particular strategy to, first, bring back some of the talents in Silicon Valley, where many Malaysians, engineers, Malaysian engineers who are in Silicon Valley working in the field of IC design, are located? Is MITI prepared to give final status, or to semiconductor and assembly companies here, to set up design centres? Perhaps we could set up satellite design centres where engineers can work remotely and send their designs to HQ? Does MITI consider this need so that we do not rely solely on assembly and testing, because we know assembly and testing are labour intensive and will be replaced by AI, and perhaps we would be weak in terms of international competition? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Yes, thank you, the Honourable Member for Balik Pulau. The Honourable Member for Paya Besar, together with the Finance Committee, once visited several semiconductor factories in Penang. I, together with the Honourable

Tuan Liew Chin TongDAP · PHIskandar PuteriEN

Member for Paya Besar. What we have in our ecosystem is actually very interesting. We indeed have what, the— an old offset. We also have the possibility of developing advanced packaging. Okay? Advanced packaging is important and also, value addition. The reason the NSS, or National Semiconductor Strategy, was formulated is to develop the whole ecosystem. The whole ecosystem, we hope we have offsets and we develop the offsets into advanced packaging. We also hope that one day we will have fabrication, and we do not forget the equipment sector. Equipment is also very important. The equipment sector is process know-how, and our equipment sectors are very interesting and very high-technology. So, what the government has done, as proposed by the Honourable Member for Balik Pulau, we now have IC Design Centre 1 in Selangor. Recently, the Right Honourable Prime Minister also launched IC Design Centre 2 in Selangor. Penang also has an IC Design Centre. But this is only part of the effort. What we hope to achieve is that we have a semiconductor sector. Our semiconductor sector is not only for developing products for international companies. We also hope that the technology we have, the capabilities we have in our country, can develop other industries, such as a combination between automation— sorry. A combination between automotive. The automotive industry with the semiconductor industry. A combination, one day perhaps, between semiconductors and the defence industry. Semiconductors with agriculture. We hope this horizontal linkage can be created in our ecosystem so that one day we become a hub that also has the most advanced products, but our technology and capabilities can be combined, with spillovers to other sectors. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Minister. For the information of Members of the Meeting, the fifth question by the Honourable Member for Kota Marudu is absent. The sixth question, the Honourable Member for Puchong is absent. So, I proceed to the seventh question. I now invite Dato' Dr. Hj. Alias bin Razak, the Honourable Member for Kuala Nerus.

[Question No. 5 – YB. Datuk Wetrom bin Bahanda (Kota Marudu) absent]

[Question No. 6 – YB. Puan Yeo Bee Yin (Puchong) absent]

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Peace be upon you and the mercy and blessings of Allah. Thank you, Mr Speaker. When the monsoon season arrives, many areas are struck by disaster; my question is number seven, it is the turn of number five.

Alias bin RazakPAS · PNKuala Nerus · questionEN

7. Dato' Dr. Haji Alias bin Razak [Kuala Nerus] asks the Minister of Health to state the government's plans to expand healthy food assistance to children aged three years and below, given that the cost of implementing the healthy nutrition programme for this group is much lower than the cost of long-term treatment arising from complications of malnutrition and stunting.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister, please. The Minister of Health.

Before I continue with this answer, I would like to welcome the presence of the Sarawak Students' Association (PEMASRA) from Universiti Kebangsaan Malaysia, numbering 29 persons. Welcome. [Applause] Mr Speaker, thank you to the Honourable Member for the concern in raising this important issue. So far, the Ministry of Health does not yet have a healthy food assistance programme specifically for children aged three years and below. However, the implementation of a specific programme may be considered based on needs, suitability and the availability of existing resources. At present, existing initiatives in the form of healthy food assistance have been consolidated into programmes such as the following. The Child Malnutrition Rehabilitation Programme, better known as the Food Basket Programme, which has been implemented since 1989 for children from hardcore poor families. This programme is for children aged six months to six years who are experiencing

The problem of nutritional deficiency (KZM) has been extended to children with KZM from poor families. The Community Feeding Programme, which targets Orang Asli children in remote areas and children in People's Housing Projects (PPR) aged one to six years in selected localities, namely high-altitude areas with nutritional deficiency problems. The Milk Assistance Programme targets children aged six months to six years from the hardcore poor and poor households at risk of KZM. The Ministry of Health (KKM) will continue to improve existing programmes, including strengthening inter-ministerial collaboration and non-governmental organisations, and empowering nutrition literacy programmes among communities to raise awareness of healthy eating. Mr Speaker, the Ministry of Health also works with other ministries through the implementation of healthy menu proposals that meet the daily nutritional needs of children at child care centres (taska), namely the PERMATA Division, Ministry of Education Malaysia; the Department of Social Welfare (JKM), Ministry of Women, Family and Community Development; the Community Development Department (KEMAS) under the Ministry of Rural and Regional Development; and the National Unity and Integration Department under the Ministry of National Unity. In addition, KKM will continue to strengthen screening and growth monitoring of children at risk of and suffering from KZM, especially among low-income B40 families and high-risk communities, so that interventions in the form of powdered milk, multivitamins and healthy food basket assistance can be delivered. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Supplementary question, the Honourable Member for Kuala Nerus.

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Thank you, Dato' Speaker, and thank you, Deputy Minister. In the report published by KKM and UNICEF in 2019, entitled "Over or Under, Double Burden of Child Malnutrition in Malaysia, Landscape Analysis Volume 1". Several policy recommendations were put forward.

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Among them is the strengthening of nutrition-related policies implemented through multi-sectoral, nutrition-specific and also nutrition-sensitive strategies, including the implementation of maternal programmes, nutrition before pregnancy, and programmes oriented towards nutrition knowledge through counselling and so on. My supplementary question. Is— what indicators has KKM set to ensure the success of each of the interventions carried out by the ministry, and how does the ministry examine the trends of this issue for the next five to 10 years? Second, relating to KZM. Because the cost of treating or rehabilitating those who are stunted and obese is very high, I propose that we do not wait for an infant or child to be diagnosed with KZM before we provide assistance. How about we simply provide all these healthy foods as education to all children aged the first 1,000 days? Thus, we can save treatment costs later when there are no more KZM cases. Thank you, Dato' Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Thank you, Honourable Member for Kuala Nerus. A good proposal. Regarding the second proposal that has been put forward, we indeed intend to provide healthy food to all children. However, given the fiscal situation we face at present, the method adopted is targeted, and also, what we propose at this time is that KKM wants every ministry involved in distributing these food baskets to follow the formulae that have been set, and the guidelines on suitable food forms must be adopted by all ministries.

And also, I hope that cooperation on the issues of child malnutrition and children with nutritional deficiency will be taken seriously, as the Honourable Member for Kuala Nerus has done. The repeated questions on this issue should be taken up by most Members of Parliament, and screening efforts and activities should be encouraged.

The problem, Mr Speaker, is that we receive fewer screenings. Therefore, the distribution of food baskets and also, what is it, advice to parents who do not bring their children to the clinic regularly makes it difficult for us to provide advice and also food basket assistance. Even if we have strong finances, we will try to obtain support from the Ministry of Economy so that we can consider a more comprehensive programme on healthy food. Also, cooperation between ministries and the industry that wishes to help and contribute, and foundations with large finances, can provide assistance to us at KKM. And also, regarding the first 1,000 days, that is the policy brought by the Honourable Minister at present to strengthen the process during the 1,000 days of growth from pre-pregnancy, where we give advice and useful input to pregnant mothers on suitable forms of food, and we provide certain methods on how we can screen our own children if they are in a not-so-good condition. And also, regarding nutritional deficiency, this is not only for small, thin children, Mr Speaker, but now it also involves children who overeat. However, food that is not nutritious causes these children to become obese. And, next, the government will also take note of what was mentioned by the Honourable Member for Kuala Nerus, and a engagement session may be held, and I also thank the Health Select Committee, YB Pulai, which recently called NGOs and experts on this food matter to the Health Select Committee's engagement session. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Alright, Honourable Member. In this dilemma, four Honourable Members are all from the government side. So I will give it to the senior one, the Chairman of Backbenchers. The Honourable Member for Paya Besar.

[Laughter] Thank you, Deputy Speaker. Thank you, Honourable Members, the BBC yang

who are very concerned about malnutrition and the stunting issue among the future generation of Malaysia. Mr Speaker, three per cent will suffer in terms of GDP if we do nothing about malnutrition, as reported by the World Bank. Three per cent of GDP will be affected in the future. That is why the issues of malnutrition and stunting are important. In Paya Besar, we have already run a first 1,000 days of life programme. Among the issues raised by the Honourable Deputy Minister is the absence of parents following up on their children's appointments for stunting and wasting, but they do not turn up. I want to ask the Honourable Deputy Minister whether the ministry is aware that many parents who receive the food baskets mentioned earlier do not turn up for follow-up because of work commitments, lack awareness of long-term effects, and also find it difficult to go to the clinic due to long distances. What concrete strategies can the ministry take to share data on missed appointments with the community so that we can carry out community support, especially for poor families and families with special needs. Thank you, Mr Speaker.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister of Health, please.

Thank you, Honourable Member for Paya Besar. A good proposal. I will try to obtain data and information sharing from KKM, as we did for the PeKa B40 programme. Perhaps we can extend information regarding parents who cannot attend for certain reasons. And also, one approach we are currently taking, which we are proposing, is to outsource KKM services. If most busy working parents cannot bring their children for screening or follow-up check-ups during working hours, they can take their children to a GP. This is being studied, and we are also reviewing and updating programmes to see whether it is suitable for GPs to also help KKM carry out screening, and then provide advice, and KKM

can channel the necessary food assistance to groups who have nutritional deficiency problems. Thank you, Honourable Member, and we will work on the information and data so that it can help us identify parents who cannot do the follow-up. Thank you, Mr Speaker.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. We move on to question number 8. Invited is Mohamad Shafizan Haji Kepli, the Honourable Member for Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Dato' Speaker. Pull the board, pull the board, The board is pulled up to the roof; Batang Lupar's question number eight, Please, Minister, give the sturdiest answer. [Applause]

Mohamad Shafizan bin KepliPBB · GPSBatang Lupar · questionEN

8. Tuan Mohamad Shafizan Haji Kepli [Batang Lupar] asks the Minister of Works to state what efforts and plans the ministry has to upgrade the Red Line Long Stretches on the Pan Borneo Highway in Sarawak, especially those that are undulating and severely damaged due to soil subsidence.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Honourable Minister of Works (JKR), a verse has been issued. [Laughter] I believe the Honourable Minister will still answer it, of course.

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

Build a fence of planks, To keep the livestock from being eaten by monitor lizards; Batang Lupar's question eight, About roads in the state of Sarawak. [Laughter] Dato' Dr. Speaker, for the information of the House, the red line sections are part of the total 829-kilometre alignment of the Pan Borneo Highway, and the total length of the red line route is 136.74 kilometres, covering Kuching, Serian, Sibu, Bintulu and Miri. These red lines, Dato' Dr. Speaker, are old roads that have been connected to new roads. The new road is the Pan Borneo, the old road is the connecting road. So, because the Pan Borneo was only recently built, the old red line road has been damaged. That is what the red line means.

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Finance · PontianEN

This route is divided into two categories: the short alignment of 17.1 kilometres, nine locations. Second, the long alignment of 119.64 kilometres involving four locations. For the short alignment, the Central Agency has approved an allocation of RM120 million under Rolling Plan 5 of the Twelfth Malaysia Plan. Good news. For repair works on the red line involving six sections totalling 17.1 kilometres at Bukit Begunan, Lachau Section. Dato' Yang di-Pertua, this must be pronounced correctly, eh, the spelling is L-A-C-H-A-U. Then, Kemena Section, Bintulu and Bakun, Sebiew Section in Niah, Tudan Section, Beluru, Selangau Section, Balingian Section, Nilai Study Laboratory from 21 to 23 May has been completed. Meanwhile, the Nilai Engineering Laboratory (VE), December 2025. For the long alignment, the Federal Government has approved an allocation of RM231 million under Rolling Plan 1 of the Thirteenth Malaysia Plan. This is another piece of good news for Pan Borneo Sarawak. The red line alignment involving the Durin and Salim Sections, 40.27 kilometres long, the Nilai Value Management Laboratory will finalise it in early 2026. And we hope that this matter can be implemented immediately for the maintenance scope of these 136.74 kilometres, which we have approved from 2021 to 2025, totalling RM133.23 million. That is for maintenance. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Supplementary question, the Honourable Member for Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Dato' Speaker. I would like to extend congratulations and well done to the Deputy Minister who recently [Applause] succeeded in obtaining a Doctor of Philosophy, PhD, in communication from UUM.

[Dewan riuh]

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Congratulations, Honourable Member.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Future Minister. [Speaking without using the microphone]

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Honourable Member, apart from upgrading the red line alignment, does the ministry intend to provide more street lights along this Pan Borneo area, and is the ministry also studying the provision of solar-powered street lights, given that in my view, solar is more cost-efficient, and does the Honourable Member agree that CCTV should be installed at every P-turn so that

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

the PDRM and JPJ can monitor this area, which frequently experiences accidents caused by drivers who take the use of P-turns lightly. And finally, will there be a party appointed to ensure that the level of cleanliness along the Pan Borneo Highway is kept at a good standard, even though it is not really a highway. Thank you, Dato' Speaker, thank you, Deputy Minister.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Dato' Speaker also recently obtained a PhD, and congratulations as well to Dato' Deputy Speaker. It took time, it is not easy, it took four years before it was completed, and many friends here also have PhDs. Okay, the earlier question about CCTV is actually not within scope, but if the PDRM and JPJ wish to implement that, especially at P-turns, it is a good effort. Regarding street lights, we recently added four additional locations at the P-turn at Sungai Pisang, Bintulu, the P-turn at Batu 10, Bintulu, and the P-turn at the Kick-off Project (KOP) section, Bintulu. We have added street lights in addition to the existing ones. Regarding cleaning and maintenance along this highway, indeed it is under the Federal Government because the road is toll-free. It is not under concession, and the Ministry of Works has appointed Pan Borneo Highway Asset Management Sdn. Bhd. as the maintenance company from 1 September 2024 to 31 August 2027 to ensure that cleaning and maintenance works are carried out. Nevertheless, there are efforts by private parties and NGOs to clean up the Pan Borneo Sarawak. Whoever wants to do it, please go ahead, but we have already appointed one, yes, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Please, the Honourable Member for Maran.

Thank you, Dato' Speaker. Assalamualaikum warahmatullahi wabarakatuh...

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Waalaikumussalam.

...Greetings of peace. Apart from the damage to the Pan Borneo Sarawak road sections, there is no lack of damage in Sabah and

also in Peninsular Malaysia. I want to know, what is the actual number of segments or sections of the Pan Borneo Highway in Sabah that are now identified as suffering serious damage, structural failure or abandonment, including a list of affected work packages? And what is the latest figure for the sections of Federal Roads and highways in Peninsular Malaysia, such as in Kelantan and other states, that are also in the critical category such as undulating, subsiding or damaged roads? What are the ministry's plans, within the comprehensive rehabilitation being drawn up, to ensure that project failures and delays do not recur in both Peninsular Malaysia and Sabah and Sarawak? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

That's a lot of questions. Never mind. The Pan Borneo segment in Sabah, there are two, Honourable Deputy. One, 15 packages for 1A. We started that long ago, since 2017, in the Barisan Nasional era. In Sarawak it has been completed, in Sabah it has not, with changes of government and so on, so there were changes in scope by the relevant governments, for example. In Sarawak it was the same government, so it was completed well. There are 15 packages for 1A and 19 packages for 1B. And we hope 1A can be completed by the end of next year, about a year more. But package 1B has only just started, only just begun, only 10 per cent done, with 90 per cent still remaining. Then there is package two. We have not yet thought about package two, we will continue it later when the government has the finances, because this road is toll-free. Next, regarding the Honourable Member for Maran's question on overall road maintenance in Peninsular Malaysia as well as Sabah and Sarawak. We applied for RM4 billion, but we received RM2.5 billion. Therefore, we will proceed according to priority, where those badly damaged will be prioritised for repair, and then we will request additional maintenance funds every year. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Before I move on to the ninth question, many deadlocks can be resolved if, in the rules of this question-and-answer session, the Honourable Minister or the Honourable Member looks at Standing Order 24(3). Under 24(3), if the Minister does not wish to answer other questions, it is fine, as long as they answer just one. I cannot

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

prevent it; that is the rule if the Minister or the government side does not want to answer other questions. Yes, 24(3), clear cut. Alright, before I go to the ninth question, I take this opportunity, Honourable Members, to welcome the presence of officers and Orang Asli students from Universiti Tenaga Nasional (UNITEN), Sultan Haji Ahmad Shah Campus, Muadzam Shah, Pahang, led by Madam Nurazariah Abidin, Director of the UNITEN Campus, to this august House. [Applause] For the information of Honourable Members, UNITEN Muadzam Shah provided scholarships worth RM9 million in 2025 for students who have completed SPM, STPM, matriculation and diploma, covering tuition fees. So, Honourable Member, if there are students in your constituency who need it, you can directly contact UNITEN. RM9 million is a lot, so...

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Honourable Member, clarification. Is it only for Orang Asli or for everyone?

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Wait, Honourable Member, I haven't finished yet. Under Standing Order 42, which states that I am speaking, please listen, Honourable Member. The campus offers foundation, diploma and degree programmes in accounting, business management and finance, with a minimum requirement of three credits in SPM. Members of Parliament are encouraged to help students in their respective constituencies to obtain this opportunity. Further information can be obtained on the UNITEN website. This is a space for the Honourable Member to help in his or her own constituency. RM9 million, that's a lot of money, that can, with permission, help poor students under B40. Alright, Honourable Member, what did you want to ask just now? Only then speak.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Thank you, Honourable Member. Is the RM9 million for all students or only for the Orang Asli?

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Tidak, semua.

Dato’ Rosol bin WahidBERSATU · PNHulu Terengganu

Terima kasih.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

That is understood, so that is why I announced it. This opportunity can help the B40, the students. Alright, before I go to the ninth question, I want to give a bit of a reprimand.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

For Orang Asli students, there is no other way; Orang Asli communities can only advance through education. That is one space. Verse 11, Surah Ar-Ra'd, yes: "Indeed, Allah will not change the condition of a people until they change what is in themselves." So, the space for the Orang Asli community is through education. Please take note of that. Alright, I go to the ninth question. I invite Mr Rushdan bin Rusmi, the Honourable Member for Padang Besar, please.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Dato' Speaker. I too once studied briefly at Sri Adika Raja, Gerik, together with the Orang Asli, just like the Honourable Minister and Deputy Minister. Okay. PUSPEN relating to the rehabilitation branch is running. My question number nine.

Rushdan bin RusmiPAS · PNPadang Besar · questionEN

9. Mr Rushdan bin Rusmi [Padang Besar] asks the Minister of Home Affairs to state what steps the ministry is taking to reduce prison overcrowding caused by drug offences, and the extent to which the ministry is prepared to re-evaluate existing policies, including proposals for controlled decriminalisation of drug use and the diversion of minor offenders to community rehabilitation programmes so that the prison cycle does not recur.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, the Honourable Minister of KDN.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Thank you, Mr Speaker, Honourable Member for Padang Besar. I pray that the Orang Asli students become great people like Dato' Speaker, who is in this House. [Applause] Padang Besar, a little information to share: as of 31 October 2025, the total number of inmates in prison institutions under the Prison Department of Malaysia is 90,825, of whom 84,1831 are in prison facilities and 6,642 are outside prison facilities undergoing rehabilitation in the community. The actual prison capacity is 76,311 and the current number is 84,1831. This shows that there is overcrowding and an excess of 7,872 prisoners above total capacity. 1 Amendment by the Honourable Deputy Minister of Home Affairs via letter dated 20 November 2025

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

In our efforts to address the issue of prison overcrowding caused by drug-related offences, the government, through KDN, is implementing a comprehensive and strategic approach covering enforcement, rehabilitation, and strengthening of the legal and correctional system. First, if we look at border control, KDN, through agencies such as the Royal Malaysia Police (PDRM), the National Anti-Drugs Agency (AADK), the Border Control and Protection Agency (AKPS) and others, carries out enforcement, including with the Malaysian Customs Department, through the construction and upgrading of border control posts and the implementation of integrated operations. This is done to ensure that undesirable matters do not occur. The effectiveness of operations has also been enhanced through the use of AI technology, data analytics and so on, in addition to our cooperation with neighbouring countries in combating drug smuggling at border areas. We are confident that this approach can prevent the entry of drugs into the country and, at the same time, reduce drug-related cases that ultimately lead to imprisonment. Second, Honourable Member, from the aspect of inmate management, there is the initiative to establish the Chenderiang Correctional Centre. This is the latest, in Tapah, Perak. This is a significant step in separating drug offenders convicted under section 15(1) and section 39C of the Dangerous Drugs Act 1952. This separation enables the implementation of treatment and rehabilitation programmes that are more focused, initiative-driven and centred, and we thereby prepare prisoners to participate in community rehabilitation programmes. This effort not only helps reduce overcrowding in main prisons, but also has the potential to lower the recidivism rate among repeat offenders. Third, Honourable Member, rehabilitation initiatives have also been expanded through community rehabilitation programmes such as the parole system, compulsory attendance orders, and licensed release of prisoners. So, these are programmes that give eligible prisoners the opportunity to undergo the rehabilitation process outside prison walls, in a more controlled and monitored environment. This is in line with our prison direction to target that two-thirds of eligible prisoners can join community rehabilitation programmes. And this directly we

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

reduce the pressure on our prison capacity and support their process of reintegration into society. And as the latest step, Honourable Member, the government has passed an amendment in this House, namely the Offenders' Compulsory Attendance (Amendment) Bill 2025, which allows more offenders, particularly those whose sentences do not exceed 10 years, to be considered for compulsory attendance orders. Honourable Member, this is a more proactive and inclusive measure. Overall, I want to say that the government is always committed and open in examining and strengthening existing policies relating to drug abuse, in line with a holistic approach that is evidence-based and rehabilitation-oriented. This commitment we demonstrate through the implementation of policies to divert drug abuse from the criminal justice system, particularly imprisonment, to more inclusive treatment and rehabilitation programmes. We translate this through the amendment to the Drug Dependants (Treatment and Rehabilitation) Act 1983, which came into force on 22 August 2025. However, Honourable Member, from time to time we continue to make various efforts and approaches, exploring new changes so that we can address the issues we face well and effectively. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. Please, Honourable Member for Padang Besar. Supplementary question.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

Thank you, Dato' Speaker. We see quite a lot of that. Given that more than 70 per cent of prisoners are drug addicts or are related to drug offences, my question on efforts to reduce prison overcrowding is this: what is the ministry's own action plan to coordinate the roles of agencies such as AADK, JKM, the district health offices and local authorities, to ensure that minor offenders, or those known as clients, who are also diverted from treatment centres to community programmes, truly receive holistic support? Among these are job placement, family counselling, follow-up treatment and risk monitoring, so that they do not return to the cycle of offences in prison.

Tuan Rushdan bin RusmiPAS · PNPadang BesarEN

And is the ministry prepared to explore a co-funding model between the Federal Government, state governments, zakat bodies and NGOs to strengthen the capacity of community treatment centres that are currently lacking in manpower facilities and expertise? That is all, thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Please, the Honourable Minister to reply.

[Bangun]

[Bangun]

Dato' Speaker, this is among the matters given attention by the Ministry of Home Affairs through the Prison Department. I want to say that as of October 2025, a total of 5,777 additional job opportunities have been successfully created across the services, manufacturing, plantation, construction, as well as livestock and agriculture sectors. This is to support the job placement of prisoners released through licensed release and parole orders. This reflects the continued commitment of the Prison Department of Malaysia in ensuring that eligible prospects have access to planned and effective re-integration support. Through PBSL and parole, low-risk prisoners have the opportunity to start work earlier with professional monitoring, thereby helping to stabilise their lives, build confidence and reduce the risk of reoffending. This adds to the cross-sector opportunities that show the success of strategic cooperation between the Prison Department and institutions as well as with the relevant parties. In the aspect of job placement, Honourable Member― a little longer, Honourable Member. Post-release welfare. The department also provides the Prison Department Halfway House, which is a temporary initiative to help prospects who have no direction, shelter or planning after release. This is another approach we take through the halfway house. They not only get safe accommodation, but are also assisted through the provision of job placement, counselling support and so on. And, Honourable Member, in our efforts to reduce prison overcrowding, the department implements strategic collaboration with AADK, with district health

offices and various other parties. This cooperation is strengthened through MRT programmes, and this enables AADK to receive information on prospects earlier, with the aim of coordinating follow-up treatment in the community. And most importantly, Honourable Member, I want to say that we indeed cooperate with various parties and we very much welcome NGOs and other parties who wish to collaborate so that together we can address the issues before us. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. Please, the Honourable Member for Tampin.

Thank you, Dato' Speaker. Drug treatment and rehabilitation programmes are an important element in reducing the rate of repeated addiction. The effectiveness of this programme depends greatly on the capacity and staff of rehabilitation personnel to carry out interventions consistently and with quality. My question to the Honourable Deputy Minister is: what is the ratio of rehabilitation staff, for example counsellors, rehabilitation officers, psychology officers and so on, to inmates undergoing drug treatment programmes? And is that ratio sufficient to give the best attention to individuals who need it? Thank you, Dato' Speaker.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Please, the Honourable Minister.

Thank you, my friend the Honourable Member for Tampin. Dato' Speaker, if we look at the ratio of rehabilitation staff― counsellors, rehabilitation officers to inmates undergoing drug treatment programmes, it is a critical factor influencing the quality and effectiveness of the treatment implemented. The ratio of prison staff categorised as rehabilitation officers is at the rate of one to 300, which means one rehabilitation officer for 300 inmates in the drug category. One to 300. The ratio proposed to ensure that drug treatment and rehabilitation programmes are effective and of quality is only 1:35.

This is very different. This is far different from the concept of psychoeducation in the process of treating and rehabilitating drug offenders. Group intervention that

is carried out must not be too large. It must not be too large at all. We take the example of the teacher-to-student ratio in daily schools. If one teacher teaches 300 people, Honourable Member can imagine how. However, in fact there is no uniform ratio throughout the world. The ratio considered sufficient depends on the type of treatment programme versus case management, the type of prison and also the jurisdiction. So, what is important is that we always use the existing staff ratio optimally and make various efforts, although we also face challenges. There is much more if I wanted to inform you. Due to time constraints, I will give it to the Honourable Member in writing. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. Before I go to the next question, is the Honourable Member for Ipoh Barat here? Ipoh Barat, is the Deputy Minister for Ipoh Barat here?

Datuk Seri Dr. Noraini binti AhmadUMNO · BNDeputy Minister of Women, Family and Community Development · Parit Sulong

Tak ada.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

So, this motion will be read by the Honourable Member? Motion. After I finish dealing with this Oral Answer session, there will be a motion. If there is no motion, at 5.30 pm we will close shop. Alright. Is there a Minister who will move this?

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the microphone]

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Alright. Because I want to close this. If there is none, I can only use my discretion for 15 minutes. If there is none, then after that I will proceed straight away, yes. Alright, I go to the last question, since I was given a period of one and a half hours to handle oral answers. At most, I can only deviate from the guidelines for 15 minutes. Question 10, Honourable Member...

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

Sorry. Sorry, Speaker. Ipoh Barat is on the way.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Baik.

Datuk Seri Dr. Noraini binti AhmadUMNO · BNParit SulongEN

He has arrived already.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

That's fine. That's fine. Alright, let me proceed with one final question, yes. For question 10, the Honourable

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Member for Kudat is not present, so I go straight to question 11. I invite Mr Zulkifli bin Ismail, the Honourable Member for Jasin, please.

Tuan Zulkifli bin IsmailPAS · PNJasinEN

Thank you, Mr Speaker. My question number 11.

[Question No. 10 – Dato' Verdon bin Bahanda (Kudat) absent]

Zulkifli bin IsmailPAS · PNJasin · questionEN

11. Mr Zulkifli bin Ismail [Jasin] asks the Minister of Health to state whether the ministry intends to build a conducive guard post at the Jasin District Health Office, Jasin Health Clinic, FELDA Kemendor Health Clinic and Merlimau Wellness Hub.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister of Health, please reply.

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

Thank you, Mr Speaker. For the Honourable Member's information, guard post infrastructure has been provided at the Jasin District Health Office, Jasin Health Clinic, FELDA Kemendor Health Clinic and Merlimau Wellness Hub. These guard posts are equipped with basic facilities such as a work space, chairs and tables, flood lights, fans and raincoats, and are used as temporary shelter for the inspection of visitors entering and leaving. Guards are required to carry out periodic patrols and are not stationed statically at the post. This is in line with the directive of the Chief Government Security Office (CGSO) to ensure compliance with the minimum standards for the protection of public assets, patients and staff at Ministry of Health facilities. However, the limited land area at all the premises concerned makes it difficult to build permanent or larger security control posts at this time. For the long-term solution, the construction of a permanent guard post that is conducive and optimised according to site suitability will be considered, depending on the financial allocation capacity provided in the future. Meanwhile, the MOH will examine the need to improve existing control structures, such as the installation of integrated heat insulation, passive ventilation systems or highly durable weather shelters for the protection and welfare

Dato Lukanisman bin Awang SauniPBB · GPSDeputy Minister of Health · SibutiEN

of the security guards on duty, as well as compliance with minimum security standards. That is all, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, the Honourable Member for Jasin. Supplementary question.

Tuan Zulkifli bin IsmailPAS · PNJasinEN

Thank you, Mr Speaker. Thank you, Mr Minister, for the very clear answer. This question is actually a follow-up to the fight incident that resulted in death last August at Jasin Hospital. That is all, thank you. There is no supplementary question.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Alright, the right side? Please. If not, I will close. The right side? Please, Honourable Member.

Puan Wong Shu QiDAP · PHKluangEN

Yes, Mr Speaker...

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Kluang.

Puan Wong Shu QiDAP · PHKluangEN

...Because this question touches on the Wellness Hub. So, I would like to know, what is the total number of Wellness Hubs across the country now, and most importantly, whether the Ministry of Health intends to collaborate with the local community, given that the Wellness Hubs are really receiving a rather good response. For example, in my area, many senior citizens actually wake up early. Before the Wellness Hub opens at 8 am, senior citizens are already queuing outside to use the Wellness Hub facilities. So, whether the ministry intends to collaborate with the local community, especially the users who always come to the Wellness Hub, so that this public facility can be used fully, that is, earlier, they can look after and not only be looked after by civil servants, because this is indeed a burden on civil servants. They only look after during operating hours, 8 am to 5 pm. If we can extend it, it will be more beneficial to the local community. That is just my suggestion. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Thank you, Honourable Kluang. Mr Speaker, although the question goes beyond the basic and policy questions. For the information of Members of the House, at present we have 33 Wellness Hubs throughout Malaysia, and this number will increase from time to time based on

the country's financial capacity and also the many requests from representatives of the people, Members of Parliament in this House. I agree with the Honourable Member's view. We will improve on the matter of the procedures for managing Wellness Hubs, and there is also a request from the public that the operating hours of Wellness Hubs be extended, extended hours, because there are working groups who can only visit Wellness Hubs after working hours. At the same time, we thank them for the response to these Wellness Hubs, and this is the way forward, with permission, for what we will manage apart from the construction of health clinics. We will also increase the number of Wellness Hubs to intensify health education literacy initiatives, disease prevention, and more comprehensive advisory services to the local community. We will also consider that public-private partnerships be intensified to provide space and a site for the construction of Wellness Hubs in the future. Thank you, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Minister. One thing that is interesting. These MADANI ministers are kind. If they don't want to answer they can, but they still answer. If we follow the rules. Alhamdulillah, yes. Alright, Honourable Member, now the session for oral question time has ended. [Question session for Oral Answers ended]

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

Dato’ Yang di-Pertua. Dato’ Yang di-Pertua, while Dato’ Yang di-Pertua was looking for me, I was in a meeting outside.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Baik, baik. We understand that the Honourable Member is very busy. Thank you.

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

Dato’ Yang di-Pertua, “Pursuant to Standing Order 12(1), I would like to propose that today’s Sitting not be adjourned until the Committee stage debate and decision on the Ministry of Works and Ministry of Transport for the Appropriation Bill 2026 and the Development Expenditure Estimates 2026 have been completed, and after that the House shall be adjourned until 10 a.m. on Tuesday, 18 November 2025.” Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Is there an Honourable Member who seconds?

Datuk Seri Dr. Noraini binti AhmadUMNO · BNDeputy Minister of Women, Family and Community Development · Parit SulongEN

I beg to second.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Very well, Honourable Member. Honourable Members, I now put the question to the House for decision. The question is that the motion as proposed just now be agreed to.

[Motion proposed and resolved in the affirmative]

Bill Brought Into the Meeting — Legal Profession (Amendment) (No.2) Bill 2025 – First ReadingBill

A Bill intituled an Act to amend the Legal Profession Act 1976; introduced into the House by the Deputy Minister in the Prime Minister’s Department (Law and Institutional Reform) [Tuan M. Kulasegaran a/l V. Murugeson]; read the first time; to be read the second time at this Sitting.

Bill Brought Into the Meeting — Rukun Tetangga (Amendment) Bill 2025 First ReadingBill

A Bill intituled an Act to amend the Rukun Tetangga Act 2012; introduced into the House by the Minister of National Unity [Datuk Aaron Ago anak Dagang]; read the first time; to be read the second and third times at the same Sitting.

Bill — Supply Bill 2026 and Development Estimates Motion 2026 CommitteeBill

The Order of the Day was read to resume consideration of the “Appropriation Bill 2026 and Development Expenditure Estimates 2026 in the Committee of the whole House.” [Seventh Day] [House in Committee] [Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor) presiding over the Committee]

Bill — Supply Bill 2026 and Development Estimates Motion 2026 Committee — Head B.27 [Schedule] – Head P.27 [Development Estimates 2026] –Bill

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Bentara. Supply Head B.27 and Development Head P.27 under the Ministry of Works are open for debate in the House. The list submitted, with permission, comprises a total of 23 Honourable Members. The list of those who will debate, opening the proceedings, is the Honourable Member for Bentong, followed by the Honourable Member for Hulu Selangor, the Honourable Member for Sri Aman, the Honourable Member for Besut, the Honourable Member for Rasah, the Honourable Member for Alor Gajah, the Honourable Member for Sri Gading, the Honourable Member for Kuala Nerus, the Honourable Member for Miri, the Honourable Member for Tumpat, the Honourable Member for Balik Pulau, the Honourable Member for Jeli, the Honourable Member for Klang, the Honourable Member for Pasir Salak, the Honourable Member for Lawas, the Honourable Member for Maran, the Honourable Member for Kuala Pilah, the Honourable Member for Kuala Langat, the Honourable Member for Padang Serai, the Honourable Member for Stampin, the Honourable Member for Langkawi, the Honourable Member for Arau, the Honourable Member for Mas Gading. Accordingly, for information, the time allocated is five minutes. However, this is subject to the discretion of the Chairman presiding over the House. I now invite the Honourable Member for Bentong to open the debate.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Dato' Pengerusi. I wish to refer directly to Item 80000 – Building New Roads. In the debate on the Budget 2025 earlier, as well as the debate on RMK13, I raised the importance of extending the LTU Bentong–Simpang Pelangai Project. [Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding over the Committee] The implementation of this project will also have a direct impact on the well-being of the residents of Simpang Pelangai. It not only shortens travel time but also facilitates access to their daily services such as hospitals, and speeds up emergency response, including the fire and rescue department and other rescue agencies. In other words, this project is not merely infrastructure; it is a safety necessity and a basic need for the local community. If this project is continued promptly, Simpang Pelangai and its surrounding areas will develop well. In the Honourable Minister’s reply last August, this application was tabled for Rolling Plan 1, Thirteenth Malaysia Plan (RMK13), for consideration by the Centre. However, I would like to ask: what is the approval status of this project in this year’s budget, and is there a specific timeframe for its implementation? Mr Chairman, I next refer to Item 08260 – Upgrading and Rehabilitating Roads. While awaiting approval for the LTU road, the only route in and out for the residents of Simpang Pelangai to Bentong is the old road, which is winding, dark, and often cut off when there are flash floods. The lack of proper drainage causes the road condition to deteriorate frequently and endangers residents. From the Road Maintenance Estimates (APJ) 2024, covering periodic maintenance of pavement, non-pavement, as well as street and traffic lights, with a total value of RM15 million, only RM2.67 million had been

allocated as of October 2024. What is the implementation status of this project, and has it been fully completed? As for Federal Road FT68, Kuala Lumpur–Bentong, Bentong welcomes the commitment from the ministry for maintenance purposes, which has identified and planned the implementation of 10 periodic pavement works valued at RM14.5 million and five periodic non-pavement works valued at RM1.4 million on this route. However, I understand that the application to upgrade this road, submitted by the state government, has not been considered in order to give way to other projects. I request that this application also be given priority as an important alternative route to avoid congestion on the Karak Highway, especially during holidays and festive seasons. Next, I refer to Item 60000, Mr Chairman, namely Upgrading Roads and Routes. As we all know, the KL–Karak Highway is the main route for residents and road users heading to the East Coast. Unfortunately, this critical route is often the site of accidents. Almost every day and week we receive reports of lorries, buses or cars overturning at bends or losing control. The situation is worsened because the route, particularly from Genting Sempah towards Bukit Tinggi, is still dark until today and is not equipped with adequate street lights. I have raised this issue many times. According to the replies from the ministry, the installation of street lights will be carried out through the widening project of the Karak Highway, which has been approved and is fully funded by the concession company. However, based on the concession agreement, the implementation period for this widening project is up to four years and will only be completed in 2029. So, I think waiting until 2029 is too long. Within these four years, all sorts of things can happen. How many accidents will occur? Is there any temporary measure that can be implemented immediately to improve the safety of highway users while awaiting the full completion of the highway widening project? Thus, I suggest that the road reflector lights that are no longer functioning along the route from Genting Sempah towards Bukit Tinggi be replaced first, to

help driving in the dark while we wait for the full installation of street lights. Finally, I would like to touch on the Simpang Ketari widening project. The Simpang Ketari project is very important to be widened because I understand this project has not yet been tabled by the state government for Rolling Plan 1, Thirteenth Malaysia Plan. I urge the ministry to give due consideration to the next rolling plan, because the widening of Simpang Ketari must be completed before the ECRL Bentong station is completed. The traffic situation on this route is very congested and will worsen by the time the ECRL station is completed. Lastly, Madam Chairman, I would like to refer to Item 020000 – Road Infrastructure Development and Construction Industry Development. I understand the ministry is constantly exploring new innovations in ensuring the development of cost-effective and durable road infrastructure. Two years ago, the ministry tried glow-in-the-dark technology, but it was found that this technology was too expensive and did not meet the ministry’s standards. So, what are the new technologies currently being explored, especially in the construction of durable roads, particularly given our country’s climate, which often faces rain throughout the year, especially during the Northeast Monsoon season. How does the ministry review the need for road infrastructure development so that it is cheaper and more durable, because maintenance costs will increase every year. That is all from Bentong. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Bentong. I invite the Honourable Member for Hulu Selangor.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Madam Chairman, for giving me the opportunity to join in the debate on the Appropriation Bill 2026, Committee stage, for the Ministry of Works. Madam Chairman, I go directly to code P.27 Item 02800 – concerning Repairing, Replacing and Upgrading Roads and Bridges. I wish to link this with a local issue in my constituency, which causes flash floods that have recurred for decades in the areas of Kampung Sentosa and the Taman Seri Cahaya housing estate, Batang Kali.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Over decades. In April 2025 alone, flash floods occurred twice within a single month in Taman Seri Cahaya. Residents had not even recovered from cleaning up before the floods came again. And the latest was last October. Among the main causes identified is a bottleneck in the existing drainage and sewerage system along Federal Road FT001, Kuala Lumpur–Tanjong Malim Road. This drainage problem has caused water to flow back, or backflow, with permission, into the village and housing areas. If this main cause is not resolved, I see that other projects such as retention ponds or upgrading residential drains will not be fully effective. Major discussions by the Public Works Department (JKR) in the Hulu Selangor District have been held since 2023, and it was informed that applications had already been submitted by the district JKR office previously, but approval has still not been given to this day.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Therefore, I request that the application for allocation for upgrading works on the drainage and sewerage systems along FT001 Kuala Lumpur–Tanjong Malim Road, sections 438 to 439 near the As-Sajidin Mosque in Kampung Sentosa, be approved with immediate effect. I ask the ministry to give serious attention to ensuring the residents of Taman Seri Cahaya and Kampung Sentosa are no longer affected by the endless flood problem. Madam Chairman, next, the same code is P.27 Item 61000 concerning upgrading roads. I seek the Ministry of Works’ attention to the need to upgrade and widen Federal Road FT001, the Kuala Lumpur–Tanjong Malim route. One of these is upgrading the Rasa junction to avoid congestion. Recently, the traffic lights at the Rasa junction were reactivated after not functioning for more than three years for road user safety reasons. However, traffic congestion remains severe, especially during peak hours and weekends, in both directions, particularly from Batang Kali to Rasa. A more comprehensive solution, namely widening the bridge from two lanes to four lanes and also upgrading the Jalan Kuala Kali, Rasa junction, needs to be implemented to overcome this congestion problem. As long as the work to upgrade the geometry of the junction

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

with the addition of lanes or [Unclear] lane, as well as improvements to the traffic light system, is not carried out, this problem will not be resolved. Madam Chairman, finally. In the ministry’s earlier statement, it was stated that 2,184 accidents recorded were at locations without street lights. These are worrying statistics and show the urgent need to install street lights at high-risk locations. I would like to link this with two critical examples where accidents frequently occur in my constituency, namely Jalan B23, Jalan Hulu Yam Bharu–Batu Caves, which connects the Hulu Selangor District and also the Gombak District, and Jalan B66, Jalan Batang Kali–Genting Highlands. The darkness has blocked visibility and threatened the safety of road users. Furthermore, trees have fallen on this route several times. Both of these routes also serve as major alternative routes. Therefore, street lights should be installed on this route as soon as possible to avoid accidents. I request that Jalan Hulu Yam Bharu–Batu Caves and Jalan Batang Kali–Genting Highlands, which are certainly used by many people, be made priority locations for the installation of street lights, preferably solar or LED lights in these areas. That is all. Thank you.

Tuan PengersiPuan Alice Lau Kiong YiengEN

Thank you, the Honourable Member for Hulu Selangor. I invite the Honourable Member for Sri Aman.

Thank you, Madam Chairman. The Honourable Member for Sri Aman only wishes to touch on three items under the Head Roads and Bridges of Sarawak, which have been allocated an estimated development expenditure of RM9.6 billion for 2026. First, Item 09280 – Building Roads. Under this item, a total of RM854 million has been allocated for 2026. I note there is an increase of approximately RM300 million compared with the allocation for 2025, which was estimated at RM553.6 million. Accordingly, the Honourable Member for Sri Aman would like to ask whether the ministry has a list of road projects to be implemented using the allocation for 2026. The Honourable Member for Sri Aman also wishes to obtain clarification on whether the projects

that the Honourable Member for Sri Aman has applied for previously, as well as projects whose implementation has been delayed due to funding or allocation constraints, will also be implemented using the funds or allocation under that item. The projects I refer to are, first, upgrading Jalan Batu Lintang to JKR R5 standard from the Pan Borneo junction to Pekan Batu Lintang. This road is the only access connecting Pekan Batu Lintang with the Pan Borneo Highway. As we all know, the Indonesian Government will relocate its capital to East Kalimantan and construction is underway. Therefore, it must be an absolute necessity to build a safety road along the border between Sarawak and Indonesia before Indonesia’s capital relocates. Second, the construction of a road from Pekan Batu Lintang to the various villages up to the Malaysia–Indonesia border at Sungai Putong, Temiang and Titikar. This aims to provide a better, safer and more comfortable road for some 20 longhouses and villages in the area. Madam Chairman, the road projects that Sri Aman has raised just now are very significant and important to the local residents because, apart from having been long awaited, they are an important basic facility to ensure the well-being and safety of the people, especially those who live or reside not far from the Sarawak or Malaysia border with Indonesia. As we all know, good and safe road access not only facilitates movement and daily affairs, but also opens up more economic and social opportunities for rural residents to enjoy development benefits on a par with communities in urban areas. Madam Chairman, next, Sri Aman wishes to raise Item 20000 – Building Multi-level Junctions and Flyovers. Under this item, Sri Aman notes that only RM300,000 has been allocated for 2026, which is lower than the RM500,000 allocated in 2025. Sri Aman would like to know what reasons or considerations have caused the 2026 allocation to be reduced, when the construction of multi-level junctions and flyovers is still very much needed in Sarawak, or whether the RM300,000 allocation for 2026 is considered sufficient to

implement all the multi-level junction and flyover projects that are still delayed or at the proposal stage at present. I raise this question following my proposal during the Budget 2026 debate at the policy level regarding the construction of multi-level junctions and flyovers at Simpang Batu Lintang and Simpang Pantu in the Sri Aman area. Although the Minister responded and stated readiness to consider the project when answering my question the other day—thank you, yes. However, I remain concerned about the adequacy of the allocation announced. This is the last, Madam Chairman. Item 82000 – Pan Borneo Highway, for which RM1.37 billion has been allocated. Madam Chairman, Sri Aman also wishes to obtain clarification from the ministry on how much of the approved allocation under this item will be used, particularly for the installation of street lights along the Pan Borneo Highway. Although this question was put by Batang Lupar to the Deputy Minister during the oral question session a short while ago, Sri Aman feels compelled to repeat the question because the alignment of the Pan Borneo Highway passing through the Sri Aman Parliamentary constituency has not been addressed in the planning for the installation and maintenance of these lights. Madam Chairman, this is because there are still several sections of the alignment that have not been provided with adequate lighting facilities. Madam Chairman, we all know that the installation of complete street lights is very important to ensure the safety and comfort of road users, especially at night, and to ensure that the Pan Borneo Highway, which is the only highway in Sarawak for now, with permission, truly functions as a safe and user-friendly highway. Before concluding my speech, once again Sri Aman requests the KKR to please consider the request and application, because they are very, very much needed. That is all. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Sri Aman. I invite the Honourable Member for Besut.

Thank you, Madam Chairman. I will now move on to 02800, namely Improvement, Replacement and Upgrading of Roads and Bridges, to raise several issues and projects in the Besut area that require the government's attention. Among them is the need to replace and repair the damaged bridge railing and related works on Jalan Seberang Jerteh up to the Kelantan state border. The estimate is not much, RM65 million only— RM65,000 only, the rest are many more. In addition, along the Kuala Terengganu – Kota Bharu road there are about seven works, namely repairs with expansion joints and other related works, required with an estimate of only RM315,000.

So, the repair and maintenance works on the expansion joints just now are very important because this component functions to absorb the movement of the bridge structure caused by changes in temperature, as well as traffic loads and vibration. Our failure to maintain them may compromise the safety level of road users and increase long-term repair costs, especially on critical routes such as the Kuala Terengganu–Kota Bharu road. So, in addition to this, the Public Works Department (JKR) has also made several applications, namely 15 periodic works with expansion joints, pavement. So, among them are mill and pave works and also works to replace the damaged bridge panels on the Kuala Terengganu–Kota Bharu road as well, and works to rehabilitate the damaged guard rail at Kampung Raja. So, JKR Besut has also applied for 15 periodic works that are not pavement, such as works to rehabilitate damaged or blocked drains on the Jerteh–Kuala Besut road, and works to replace new signboards on the Kuala Terengganu–Kota Bharu road and repaint faded road markings on the Seberang Jerteh to Kelantan state border road. Madam Chairman, the projects I have mentioned and the others applied for by JKR Besut are not merely systematic works. They are not for beautifying the roads; rather, they are an urgent need to ensure our road conditions are at the best standard and to prevent the safety of road users from being compromised.

So, these applications have indeed been raised in accordance with the results of the pavement condition analysis, which shows that these roads have suffered damage and need immediate repair. The structural condition and existing durability of the roads have also reached the end of their lifespan, causing concern over safety among the people who commute on the roads every day. Furthermore, taking into account the readiness of such infrastructure in facing the Northeast Monsoon, I mean floods. So, therefore, I urge that the government consider these applications so that the people are not deprived of their right to access road facilities. So, I want to state the justification for this application. What I have stated is the condition of this road structure, the existing durability of the road has— has reached the end of its lifespan, needs repair, and the implementation of the pavement condition analysis also shows that the road has suffered damage and needs to be repaired immediately. And I only want to ask, as a final point, about upgrading Route FT65. Its length is about 3.5 kilometres for the first phase, that is. So, its scope is new surfacing, construction of a drainage system, slope strengthening, and construction of a small bridge. The estimate is about RM12 million. That's a bit big. So, the total for what I have just mentioned is about RM25 million. That is all we are asking for. And finally, really finally, Datuk Minister. I want to know the latest status of the Jerteh bridge. Has the tender been advertised the other day? I understand that on the 23rd of this month it was advertised. Is that correct or not, Minister? Never mind, answer later. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Besut. I invite the Honourable Member for Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Madam Chairman, for the opportunity given to me to take part in the debate on the Budget 2026 at the Committee Stage for the Ministry of Works. First, I congratulate this ministry because it is this ministry that receives the highest development allocation among all the

Tuan Cha Kee ChinDAP · PHRasahEN

ministries. It rose from RM9.32 billion to RM9.6 billion this year. So, I believe this shows the commitment of the MADANI Government to ensure that infrastructure development across the country is always in the best condition. I want to mention specifically today one item only. But there are several constructions involving the road network in my constituency, namely under Item 61000 – Upgrading of Roads. Of which this time RM2.8 billion has been allocated compared with the previous budget. I want to mention the first one. The construction of new roads including flyovers from the Bandar Enstek Toll FT362 to Gateway Seremban, which passes through— Involves Jalan Labu in my constituency. I know, RM500 million has been allocated by the Federal Government. I want to ask, for Budget 2026 alone, how much is— How many millions is the breakdown? Because this project started in the previous year, 2024, until 2028. It takes four years to complete. I want to state openly because this project is not only about construction, but also involves land acquisition for 62 lots, which include government and private lots. I specifically want to mention that it involves land acquisition of SJK(C) Hillside. The school was contacted by JKR in the third week of August. At that time, I happened to ask a question in the Special Chamber regarding this matter. Before that, the school did not receive any notice, either in writing or verbally, from the relevant agency. What is happening now, Honourable Deputy Minister, is that because of the land acquisition, more than 40 percent of the school's parking area is affected, and the school has appointed its engineer who happens to be a board member of the LPS. Discussing with the JKR engineers on the project, requesting that there be some leniency, the area taken may be reduced. For the information of the Honourable Deputy Minister, when the Deputy Minister returns to Johor, you can see it from the highway. This is one of the— Rarely is there a school visible from the highway. SJK(C) Hillside can be seen from the highway, and this SJK(C) is the school with the second largest number of pupils among all SJK(C)s in Negeri Sembilan. Coincidentally, the Most Honourable Menteri Besar of Negeri Sembilan is present here. This school is indeed developing rapidly. So, the issue of land acquisition, we must know. Because I myself have fought for the upgrading of this road during my first term as Member of Parliament.

Tuan Cha Kee ChinDAP · PHRasahEN

However, I hope there is some leniency for this school. Ask the engineers to redo the alignment technically together with the engineers from the school's LPS so that the acquisition can be reduced somewhat. Because next to this school, there is a Hindu temple, which is more or less the same. Discussions, because the school did not want to be notified late. The school was only informed as I mentioned, the third week of August. After it was gazetted in the Negeri Sembilan State Gazette, with its gazette number, which is gazette number 677 on 31 July. Before the gazetting, the school was not informed. It was only informed at that time. I have met the Director of JKPTG Negeri Sembilan. He said it could be done, but it must go through JKR, the relevant agency. So, I humbly ask for the goodwill of JKR under KKR to provide leniency. Perhaps the area taken could be reduced by two or three metres so that the parking area is preserved. If it is like this now, it will cause severe traffic congestion. So, the second point under this, Madam Chairman, concerns the phase of the Seremban Middle Ring Road. I have mentioned it many times. Its construction project stopped after Phase 3B since the RMK11. So, when will it be continued? I humbly ask that— Because a middle ring road, if it enters the ring, is a circle. Now it is a semi-ring. It starts from Labu and stops. I ask that it be continued to Templer until Ampangan. And this road is very useful to ensure that we can reduce traffic congestion by taking into account the development in the areas involved. 30 seconds more.

Tuan Cha Kee ChinDAP · PHRasahEN

And the third point under this heading also, another road, namely Jalan Nilai, Labu and Bandar Enstek, which is 16.3 km long. I understand this road will be completed next year and can be used. I thank the government because it will help boost traffic and the economy in the Labu to Bandar Enstek area under the Rasah Parliamentary constituency. Only I want to ask, the Most Honourable Prime Minister, when tabling the Budget 2026, mentioned a new toll to be built for the Malaysian Vision Valley (MVV), whether that is the place, because I see this is an extension to the PLUS Highway. I seek clarification from the Honourable Deputy

Tuan Cha Kee ChinDAP · PHRasahEN

Minister when winding up later. And I hope the Ministry of Works will continue to be attentive in ensuring infrastructure development and ensuring our infrastructure is always in the best condition. That is all, thank you, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Rasah. I invite the Honourable Member for Alor Setar.

Thank you, Honourable Madam Chairman, and the Honourable Deputy Minister who is also present in the House. I stand to debate Items 6000 and 6100 relating to the upgrading of roads and routes. Honourable Madam Chairman, I also speak not only as the Member of Parliament, but as representing the voices of motorcycle users. Coincidentally, last week I had some discussions with 38 motorcycle clubs and they asked that this voice be conveyed into Parliament. This relates to the Ministry of Works. The first is regarding the issue of the Smart Lane route. I seek an explanation from the ministry, to what extent can the Smart Lane solve traffic congestion? Because this Smart Lane is not as long as the highway, it is limited. Later, when the Smart Lane ends, the cars in the Smart Lane will re-enter the original lanes. So, it is logical that it will become congested again after the Smart Lane ends. The second, this Smart Lane route was originally an emergency lane. So, my question is, how will this emergency lane function when the Smart Lane is activated? We see many motorcycle accidents occurring, especially. The rider is confused whether the car is moving or stopped. Usually what happens is he thinks the car is moving, then he drives in the Smart Lane. Eventually, the car is actually stopped and he crashes into the stopped car, causing an accident and deaths. This has just happened— also in Johor, my own friend who just passed away. I am not sure what actually happened, but the incident occurred in the emergency lane. The third is that the Smart Lane creates a dilemma for motorcycle users. On the highway, we do not have a specific lane for motorcycles, Honourable Member.

I believe the Honourable Member is well aware. And usually motorcycles will drive in the left lane. When there is congestion on the highway, motorcycle users will use the emergency lane, that is common. When the Smart Lane is activated, where should these motorcycle users go? The emergency lane has become a Smart Lane, so they use the leftmost lane, then the right lane, and so on. Finally, they have to weave between busy vehicles and that can increase the risk of accidents for vehicles and for the motorcycle users themselves. In my view, for motorcycle users, the Smart Lane route in fact adds to the difficulties for motorcycle users to some extent, and they need a more serious answer from the government so that they also have rights on the highway. And this Smart Lane too, if we look at some roads, the emergency lane itself is actually narrower than the normal lanes. Sometimes there are— sometimes there are stones, there are tyres, debris from lorry tyres, there is grass growing in the gaps between the concrete and the tar, causing slipperiness. And another thing, Honourable Member, sometimes the white line, when it rains, is quite slippery for motorcycle users. So, is the white line that is painted taking into account that when it rains it is not slippery? Is that technology now being used? And...

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Alor Setar, Alor Setar. A little on the Smart Lane. Just a little, brief only.

Oh, you want to interject on this matter too?

Dato’ Rosol bin WahidBERSATU · PNHulu Terengganu

Sikit sahaja.

Please, please, but quickly.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

I have received a report that the Smart Lane or RFID does not tally with Touch n Go. That means, whoever enters using RFID and wants to pay with Touch n Go, is charged differently. That requires an answer. Thank you.

I ask that it be put in for the Minister to answer, thank you. Next is regarding the details concerning the Malaysian Highway Authority (LLM). What if the ministry

proposes or does so that at every toll plaza or at these R&Rs, we provide vehicle workshops, Honourable Member, because we find many vehicles break down, especially motorcycles that are difficult to repair when they break down in the middle of the road. Before entering the highway, the motorcycle is fine. But on the highway, it breaks down, and to go and find help outside is far. Although there are highway patrol services, it would be faster if there were mobile foremen who could repair, or if there were suitable workshops at any R&R. Also related to the highway route, the motorcycle route, Honourable Deputy Minister. There are routes that are dark, there are routes where the bends are quite dangerous. If one does not slow down, one will skid off. And usually, this is my own experience, I am also a motorcycle user. After the toll plaza, the motorcycle lane will be blocked by vehicles parked. Lorries, containers, other vehicles stopped for emergencies, causing motorcycle users to be forced to take the lane that is for ordinary vehicles. For example, at the Duta Toll Plaza. To enter the Duta Toll Plaza, after the Duta Toll there is a Shell and usually after that petrol station there are many trailers parked. That route is an uphill route, causing motorcycles to be forced to take the side that is a bit to the right, and this is dangerous because cars that have just started are accelerating at such a place. So, what action will the ministry take? Finally, Honourable Deputy Chairman, Honourable Madam Chairman, is regarding an incident that just happened on the East Coast Expressway 1 (LPT1). There is a viral video, at the Temerloh Bridge, the road divider concrete is quite confusing. From a normal highway with three lanes, by the time it reaches the Temerloh Bridge there are only two lanes. The Honourable Member for Temerloh may be able to confirm. There was an incident in a viral video, a motorcycle went up on the divider— the divider concrete, and was thrown off. There have already been two videos of accidents occurring there and both involved motorcycle users. So, I urge the Ministry of Works in designing this road, please give serious attention to motorcycle users, because they are a large group of users in Malaysia and they also pay road tax like other users pay, and their lives are also valuable. Thank you, Honourable Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Alor Setar. I invite the Honourable Member for Sri Gading.

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Madam Chairman. First of all, congratulations and thanks from the people of Ayer Hitam and also of the neighbouring Sri Gading constituency, because the road works related to FT50 have been completed, perhaps 99 per cent. However, residents in the area have some complaints about congestion centred at the Parit Raja traffic light itself. Why? Because, for the information of the Deputy Minister, people from Johor have only one U-turn from Parit Hamid, at the junction of Parit Hamid and Parit Raja. The distance is about 5.4 kilometres, but there is only one U-turn. So, it is quite far. Therefore, most residents who want to go to town, who want to go to the market town or who want to return to the village from the market town, take only one route, namely the Parit Raja traffic light. Sri Gading's proposal is that one more traffic light be built at Taman Kelisa, Parit Raja, which is only about 2.2 kilometres from the Parit Raja traffic light, and it could avoid the congestion occurring at that junction. I refer to this matter under Item 02800 – Repair, Replacement and Upgrading of Roads and Bridges. Madam Speaker, Madam Chairman, Item 81000 – Construction of New Roads, where, as we know, this allocation, although it appears to have decreased by RM6.66 million, is important for the construction of new roads. Sri Gading's proposal is that the construction of future highways take into account smart safety technology, especially as mentioned by Alor Setar earlier. The use of highways that do not specifically provide for motorcycles, and accidents occurring, many of which are caused by motorcycles, because sometimes they are not going fast, but are squeezed by large vehicles or other vehicles.

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

On this related matter too, Sri Gading would like to ask the ministry concerned about state roads and Federal Roads. Yes, state roads and Federal Roads, where, within the Sri Gading Parliamentary constituency, there are two roads where fatal accidents keep

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

happening, namely Jalan Parit Botak and Jalan Seri Bengkal. Where, if we look, these roads have no road shoulders. When there is no road shoulder, it means motorcycles will share the road with large vehicles. And this often results in fatal accidents which sometimes, not only in terms of loss of life, but also result in injuries and accidents, loss of limbs. For example, this year, a Form 5 female student who was about to sit for the SPM examination was involved in an accident and had to have her leg amputated. Adik Nur Khairunnisa had to sit for the SPM examination without a leg. So, this is a matter that we must try to help with, yes, the Federal Government or the Federal Government, if it is possible to widen the shoulders of Jalan Parit Botak and Seri Bengkal with assistance to facilitate small vehicles, namely motorcycles, which are mostly used by villagers. Because this road is a village road, although it is not in a town, it is a very important route for the people in its use. Next, regarding the last point, the construction of road structures and the development of the construction industry. Where under allocation 030200, where, if we look, if the KKR intends to optimise again the abandoned hotel buildings in several R&R areas. This too, if we look, for example, some abandoned hotel buildings, for example the nearest one at Ayer Keroh. Sometimes we can see that it is simply empty. If it could be transformed into a modern rest area, not merely a place of accommodation, but could be made into concepts such as a coworking space, family lounge rooms, small meeting rooms, which may create a new dimension to the R&R functions that we have in our country. And this could give rise to a micro socio-economic hub that could increase travel productivity, for people to come for small-scale meetings, people nearby. So, this would also provide an opportunity for traders, especially those who are close to the area concerned. So, that is all I wanted to bring this morning. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Sri Gading. I invite the Honourable Kuala Nerus.

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace. Thank you, Madam Chairman, for allowing Kuala Nerus to take part in the debate on the Committee of Supply for the Ministry of Works today. Mr Chairman, the allocation for the KKR for 2026, as we can see, amounts to RM10.69 billion, a slight increase compared with RM10.35 billion in 2025. However, behind these large figures, there are several matters that need to be given serious attention so that national development is truly fair and comprehensive, including for the people of Kuala Nerus in particular and also the state of Terengganu. First, I would like to touch on Item 30000 – Operating Expenditure Assets. Under this Item, I would like to emphasise the matter of spending effectiveness. Although the overall amount has increased, we see a major decline in the operating asset component, namely from RM60.7 million in 2025 to only RM25.9 million in 2026. Therefore, I request clarification on the extent to which the reduction in the budget for this operating asset component will affect the maintenance of existing assets such as schools, hospitals and government buildings, including in Terengganu. I am worried that if the maintenance budget is reduced, long-term costs will increase further, which will ultimately affect the people as users. Under Item 010300 – JKR Centre of Engineering and Technology Excellence. Regarding this sustainable construction issue, the ministry has set a target of 90 per cent of new projects valued at RM10 million and above to use Building Information Modelling, namely BIM, by 2026. It is acknowledged that BIM is indeed an important technology in the construction industry for improving efficiency, accuracy and collaboration among all stakeholders throughout the project life cycle. But, the major challenge is the capability of local contractors. Many small contractors in the East Coast, especially in Terengganu, are not yet prepared in terms of expertise and cost. I am worried that if there is no government training and incentive, only large companies in the main cities will get

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

project tenders. Meanwhile, small contractors, especially in Terengganu, will continue to be marginalised. Therefore, what is the government's plan to address this situation? And what is the government's assurance that the BIM training targeted at 1,000 personnel by 2026 will be distributed fairly in the East Coast, especially in the state of Terengganu? Under Item 020000 – Road Infrastructure Development and Construction Industry Development. Under this heading, data shows that only 52.93 per cent of Federal Roads were upgraded in 2024, but the target jumped to 85 per cent for 2025–2026. I request the government's clarification on the extent to which this government target involves federal roads in Terengganu. For the information of Mr Chairman, several Federal Roads in Terengganu need to be, and I request that they be upgraded immediately to meet the current needs of the people. Among them, the Buluh Gading Bridge to resolve the congestion issue from the Batu Enam Roundabout, Kuala Nerus heading towards Manir. Second, the widening of the road from Manir to Gong Badak. And third, the missing link from Bandar Baru Kuala Nerus to Jalan Kelantan, which connects Kuala Terengganu with Kota Baharu, Kelantan. I want to emphasise here...

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Kuala Nerus, can you add one more?

Ha, sila.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

The road between Kuala Jeneris and Tasik Gawi, whose land has already been acquired, and this is to welcome the Visit Malaysia Year next year, that is a request from the people of Terengganu. Agree, Kuala Nerus? Thank you.

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

I agree, include it in my speech. I want to emphasise here too, Federal Roads on the East Coast are the main artery for tourism, as mentioned by Hulu Terengganu just now.

Kuala Nerus, Setiu. A little.

Sila, sila.

I want to raise the issue of the road, a dangerous bend at the boundary between Kuala Nerus and Setiu at Sungai Tong. So, I propose that the road be straightened, agreed?

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

I agree. Please include it in my speech. Tourism, fisheries and the transportation of agricultural produce logistics are very important to ensure balanced regional development in this country. If this target is not achieved, the development of rural people will continue to lag behind and be marginalised. I request the government's assurance that upgrading projects are not concentrated only in the Klang Valley, in the developed states, but also remember the areas of the East Coast, especially the state of Terengganu. And finally, Madam Chairman. Item 031200 – Environment and Energy Efficiency Branch. In the budget for the environment and energy efficiency branch in 2026, it is only around RM7.48 million. A figure that is too small compared with the overall budget of the ministry. In the context of climate change, is the government truly serious about the green agenda or is it merely placing the environment as a complement in the budget. Terengganu is among the states most exposed to climate disasters, namely massive floods that recur every year. Coastal erosion is becoming increasingly critical and the threat of rising sea levels affects coastal communities. Therefore, investment in energy efficiency and environmental protection is an investment to save lives, property and the economic future of the state. So, how can this budget cover the scientific costs of green technology development, flood mitigation programmes and coastal protection which require hundreds of millions of ringgit. Please clarify. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kuala Nerus. I invite the Honourable Miri.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you, Mr Speaker, for the opportunity given. I would like to refer to Head P.27, Item 09280 – Construction of roads for highways and bridges in Sarawak. First, I would like to express my highest appreciation to the Ministry of Works for approving two projects to be implemented to repair and upgrade the Kuala Baram Bypass, Miri and from Sungai Baram up to the Miri Industrial Training Institute.

Tuan Chiew Choon ManPKR · PHMiriEN

With regard to another project, namely preliminary works for the upgrading project of the GK Roundabout or Pujut 3 to the traffic light junction, as well as upgrading Jalan Bulatan Puchong to Sungai Lutong – Lorong from Bulatan Saberkas to the Pujut 7 junction, Miri division, which was approved under Rolling Plan 4 of the Twelfth Malaysia Plan, covering site investigation (SI) and traffic impact study and land survey. It was also informed by the Honourable Minister that for the physical implementation of this project, the central agency has given approval under the Thirteenth Malaysia Plan, Rolling Plan 1, with a total cost of RM70 million. It is also understood that the value management workshop at the value study stage will be carried out in 2026 to finalise the scope and cost of this project. Indeed, this project has been greatly anticipated by the people of Miri. For a long time we have been waiting because it is a bottleneck, with permission, to connect Miri City Centre with residents in the northern part of Miri and also visitors from Brunei. Every day congestion still occurs because of this bottleneck. So, the people really hope this project can be completed as early as possible. Thank you for the concern and approval given by the government for this project. I would like to take this opportunity to request details and information about this project. Especially: (i) the projected completion date of the preliminary works of this project approved under Rolling Plan 4 RMK12; (ii) the scope and planned works for the physical works approved under Rolling Plan 1 RMK13; (iii) the implementation period of the value management workshop at the value study stage for this project; and (iv) the implementation period for the physical or construction works of this project based on the planned scope and works. Next, I would like to refer to Item 82000 – Pan Borneo Highway. I would like to request the government to expedite the complete completion of the Pan Borneo in Sarawak, especially for the final section in the Miri division. It is also understood that this project has been placed under Project Package WPC11.

Tuan Chiew Choon ManPKR · PHMiriEN

I would also like to request the government to explain the plan for maintenance of this Pan Borneo Highway so that this road can always be in good condition. Third, I would also like to request the government's plan in terms of providing facilities, especially R&R, and also connectivity in terms of telecommunication signal along the Pan Borneo Highway in Sarawak. And finally, I refer to Head B.27, Item 030900 – Education Works Branch. I request that the Ministry of Works examine and monitor the implementation of projects, especially the completion of outstanding works, as the upgrading of dilapidated schools for SK Sayed Othman, Miri has been delayed for a long time. I request that additional monitoring be provided so that this project can be fully completed next year. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Miri. I invite the Honourable Arau.

Thank you, Madam Chairman. Thank you to the people of Malaysia, the young people, the people of Balung. Honourable Member, MARRIS, yes. B.27, Item 02000, yes. So MARRIS— we know that this is a road that has been subject to the statement of Datuk Sri Fadillah Yusof, “State governments are only permitted to maintain state roads that have been registered in the MARRIS system and subject to the categories and scope of maintenance stated in the GP MARRIS.” Honourable Member, this is a registered road, but among registered roads, there are roads that are easily damaged, and there are roads that are not registered. I see, I have observed, I looked at areas in Sabah, in Sarawak too, Lanang, I don't know, perhaps the roads are good, in Perlis, that roads that are easily damaged, which connect to state roads, their registration is open. Not the registration that we determine. For example, I have just returned from Balung. Balung, Honourable Member. I have just returned from Balung, I went to Kampung Serudung Baru, Andrassy, the roads of Bukit Kueng, Jalan Kinabutan, Jalan Ranggu, Jalan Cocoa, Jalan Balung as examples. I see that these roads are certainly not registered, but their dilapidation is extraordinary. So we

ask for a more open form of registration so that the government can look at this matter more thoroughly. I know the answer, the Minister may say, “Ha, you can refer this to the Ministry of Rural Development.” We know, we can be referred all over the place, but this one is specific. I hope the Minister of Works is good, the Deputy Minister watches how this is answered, then we can praise. But I ask that this registration be done openly, Honourable Member, so that these dilapidated roads can be maintained, be maintained. If these roads are maintained twice a year, they will still be damaged, but at least there is an effort by the government to maintain them. So, I ask that these small roads be allowed open registration in a form where we look at the damage faced. Second, we propose that an internal audit and also mandatory registration in JKR be carried out so that the roads that I mentioned are not left behind. Then secondly Honourable Member, that DOSM has recorded that the increase in cement prices is four per cent. So, among the places with the highest increases are in the— in Selangor, the Federal Territory, Melaka, Negeri Sembilan and Sandakan. Four per cent increase and followed by Johor (3.5); Pahang (3.3). This is the DOSM report, April 2025. But this increase is not aligned with the JKR price rate schedule. So, we ask that this price rate schedule must be observed. If not, class FG1 faces problems. If they face problems, these roads will be neglected. So, I want to ask the Honourable Member, what is the— this has been mentioned hundreds of times in this Parliament. The Price Rate Schedule can be aligned with the increase in the price of goods. Finally, Honourable Member, I want to mention this because it is about promotion, yes, regarding B.27, Item 010100. About J9, Honourable Member. Intake of 2008 J9. J8 is finished. They have been promoted to J12. But the 2009 intake, some J9 who have served for 16 years, have not been promoted to J12. Now, the number is already hundreds of people. So Honourable Member, please look at this matter. Will the government look at a more transparent approach, with permission, made by JPA. We can give them a special time base for incumbents or a one-off promotion. If not, many

of these people will face problems after serving for so long, perhaps only retiring at J12. So, it is not appropriate for us to do this to them when they have high qualifications, technocrats, and suddenly when they enter government service, they face problems. Honourable Member, please look at why 2008 is already finished? 2009 with 2000— intake 2009, until now they have not got promotion and they have served for such a long time.

So, thank you. Assalamualaikum warahmatullahi wabarakatuh. May my friends in Balung, Tanjung Batu, Merotai, Kunak, Karambunai and whatever, Petagas win the elections.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Arau. I invite the Honourable Balik Pulau.

[Dewan ketawa]

Managed a little campaigning there, Arau. Chairman, thank you from Balik Pulau for being given the opportunity to debate in this honourable House. I now move straight to Item 040200 – Slope Engineering Branch. I wish to draw the attention of this honourable House to the landslide that occurred on Thursday, 23 October, on Jalan Tun Sardon. This is a route that connects Balik Pulau with the outside world, and it is one of the two main arteries for the movement of the Balik Pulau population to all of Penang, including to workplaces, places— going to hospitals and schools. The incident not only disrupted traffic flow but also became a safety concern for road users, especially with the extraordinarily heavy rains that have occurred recently. Malaysia now has 34,400 slopes identified by JKR, which shows how great the need is for monitoring infrastructure in hilly areas. Even more worrying, 1,087 slopes had been categorised as high-risk as of September 2025. Thus, the location of Jalan Tun Sardon, which is hilly and has bends, makes this route highly exposed to the risk of landslides such as the one that happened recently. In areas such as Jalan Tun Sardon, which is hilly, sharp bends and

exposed to heavy rain, slope risk and accidents reinforce one another. Minor slips (the minor slips), with permission, standing water, fast-flowing water on the road shoulders, limited visibility and slippery conditions are the main factors contributing to accidents. Therefore, it is insufficient to view slopes merely as a geotechnical issue and accidents merely as a traffic issue. Both require an integrated approach involving real-time slope monitoring, early warning systems for rain and landslides, road maintenance in high-risk slope areas, improved street lighting, guard rails, warning signboards, and redesign of bends and critical slopes. I also wish to take this opportunity to record my highest appreciation to the JKR slope team and also the JKR South West District, which acted swiftly and efficiently. They not only cleared the debris and removed the large rocks that blocked the route during the landslide, but also succeeded in stabilising the slope in a short time. And as a result of that effort, I wish to record here that the road was successfully reopened on Friday, 31 October. A swift action that is highly appreciated by the people of Balik Pulau. Thank you also to the Honourable Minister of Works, who also came to visit the slope stabilisation work at FT06 on the road to Teluk Bahang. This shows the concern of the Honourable Minister, and I am very grateful for that concern. Chairman, I also wish to propose that JKR consider the slope safety model in Hong Kong, which has proven successful in drastically reducing landslide risk since the 70s. I once visited the GO, or Geotechnical Engineering Office, in Hong Kong, and they have a comprehensive slope database and continuous risk assessment. They also have annual slope audits to identify slopes that need rehabilitation before failure occurs. And an early warning system based on rainfall that also gives notification to the public and the authorities. And engineering standards that are— stricter slope standards, including soil nailing, subsurface drainage and retaining walls. I feel this approach is very suitable

to be applied in Malaysia and in high-slope areas such as Balik Pulau, Bukit Bendera, Genting and Cameron Highlands, as well as hill towns in Sabah and Sarawak. With the landslide on Jalan Tun Sardon, the main road just mentioned, I also wish to recommend that KKR begin a feasibility study on building a tunnel connecting Balik Pulau to Bukit Jambul. This proposal is important because of the increasing traffic volume in the urban area, the dependence on two main routes that are often disrupted by landslides, floods and falling rocks, and the need for an alternative route for emergency situations. I hope that KKR will at least begin the feasibility study under the upcoming Malaysia Plan. Under Item 81000, namely building new roads or new projects. A total of RM96 — RM96 billion. I would like to ask, if the Deputy Minister could share the list of new projects, especially those involving the state of Penang, because FT06, the main road which is the missing link from the hill side of Teluk Kumbar to PUSPAKOM, is a missing link that has yet to be built. I hope that FT06 is a project on that list, one that is important to complete the road network in the area and to give a positive impact on the mobility of the people and the development of the surrounding area. I would like to ask the ministry specifically, when can the FT06 project officially begin? I am confident that the Ministry of Works will continue to be committed to carrying out maintenance, monitoring, engineering improvements and the construction of new infrastructure to ensure that the roads in our country are safer, more efficient and more resilient. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Balik Pulau. I invite the Honourable Jeli.

Tuan Zahari bin KechikBERSATU · PNJeliEN

Madam Chairman, with your permission, I wish to touch on three items together, namely Item 60000 – Upgrading of Roads and Routes, Item 61000 – Upgrading of Roads, Item 71000 – Beautification and Rehabilitation of Roads. The three items I have mentioned total an allocation of RM3.2 billion.

Tuan Zahari bin KechikBERSATU · PNJeliEN

With an allocation this large, Jeli sincerely hopes that the MADANI Government will give more and special attention to the land of Kelantan, the only state that does not have a road network that can be categorised as an expressway. The East-West Highway from Bandar Jeli to the Kelantan–Perak border, 40 kilometres long, needs upgrading. I understand that the route from the Kelantan–Perak border to Gerik has already been upgraded with the installation of 385 solar lights. If the Jeli side is also upgraded in the same way, with the addition of lanes and the installation of street lights, it will— it would complete this East-West Highway to provide comfort and safety to the users who frequently use this route. Likewise the road from Jeli to Gua Musang via Kuala Balah, FT66. This route is an important route to Gua Musang and onward to Kuala Lumpur. Recently, this route has suffered much damage that really requires maintenance and upgrading. In keeping with the importance of this route, it is very appropriate that it be upgraded urgently. And most recently, there was a road collapse at the Sungai Terah location near Gua Musang. The Batu Gajah–Lawang road, FT199, and I am confident this route was once travelled by the Deputy Minister, YB Pontian, and I am confident he is very skilled on this road because we— we once rode pillion on a motorcycle together. This road was completed with upgrading at kilometre three to kilometre five in 2023. However, at the end of 2024, at the same location, a collapse occurred on the road shoulder due to overflowing floods. Although an application has been made, until now there is no sign of repair work. But overall, this road needs upgrading and improvement because during the festive season, this road is the main alternative route for migrants returning from outside and entering Kelantan every time there is a festival, and this road is very busy and needs widening and street lights. Madam Chairman, Item 89000 – Acquisition of Land for Road or Bridge Projects. This issue I raised in my debate at the Committee stage last year. Once again, I wish to draw the government's attention that it is very important that this land acquisition issue be resolved earlier. In fact, I propose that it be resolved even before the SST is issued to the contractor.

Tuan Zahari bin KechikBERSATU · PNJeliEN

This is to ensure that any project is not delayed or abandoned because of land acquisition that has not been completed.

Tuan Zahari bin KechikBERSATU · PNJeliEN

A concrete example in Jeli is a project— the Project to Build a New Road from Kampung Jalan Malaysia to Kampung Berdang. Project start date 30 June 2022. Scheduled completion date 29 June 2025. An EOT has been given and the new completion date is 30.12.2027. Land acquisition involves 49 lots, only 25 lots have just been completed, for which the quota was given a Form K letter by JKR. And recently, only just starting site clearance work after more than three years since the SST was issued. Imagine, Madam Chairman, as a result of the difficulty or non-resolution of this land acquisition problem, it caused the project to be stalled for three years. Therefore I propose that this problem be resolved immediately so that this project can continue smoothly and enable the people there, the people of Jeli, to use this road in the best way possible, and I hope it can be completed by the new EOT date that has been issued. That is all, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Jeli. I invite the Honourable Klang.

Thank you, Madam Chairman, for the opportunity given to take part in this Committee-stage debate on the Ministry of Works. A ministry that has received a large allocation, namely RM1.08 billion for operating expenditure and RM9.61 billion for development expenditure under Item B/P.27. In the Federal Expenditure Estimates, this total makes this ministry one of the highest recipients of development allocation in this year's budget. However, this large allocation must be translated into projects that truly have an impact on the people, particularly in terms of road maintenance, basic infrastructure development and monitoring the quality of contractors' work, especially in the city of Klang. Madam Chairman, first of all I wish to raise a very critical issue in my constituency, namely the need for a more detailed soil study and the selection of the type of bitumen in

the construction and maintenance of roads. In Klang, especially in areas heavily used by heavy vehicles such as Port Klang, Jalan Kebun and industrial areas near Bandar Bukit Raja, these roads are easily damaged and pothole-ridden even though they have just been repaired. This situation occurs because these roads were built on soft and unstable marine clay, but in-depth geotechnical studies were not carried out and the type of bitumen used is not suitable for the soil conditions and heavy traffic loads. I would like to refer to Item B/P.27 of the Ministry of Works, especially Activity Item 020300 – Geotechnical Engineering Branch, which received an allocation of RM9.7 million for 2026. The function of this activity is to ensure road designs comply with high-quality standard specifications and economical costs, as well as to provide technical expertise in geotechnical engineering. In addition, there is also a large allocation under the B/P activity, Item 1900 – Engineering Research and Development, which is allocated RM58.57 million. These funds should be used strategically to solve the problem of repeatedly damaged roads in Klang, not merely to repair the same roads over and over. No matter how many times we patch a road, it still gets damaged again. Therefore, it is time for us to move from a reactive approach to a proactive approach, namely by strengthening soil studies, exploring alternative construction materials that are more durable and developing construction technology suited to tropical soil conditions and heavy traffic loads. I request that part of this allocation be channelled specifically to the Klang area, which is the logistics hub of the nation. If we continue doing the same thing and expecting different results, we are not only wasting the people's money but also failing to solve the basic problems that have dragged on for years. I also wish to draw the attention of this honourable House to one issue that is increasingly acute in my constituency, namely the problem of inadequate drainage and sewerage systems that are poorly maintained, which are among the main causes of recurring flash floods in Klang. Every time there is heavy rain, Klang is sure to be hit by floods. Not because the people are not concerned, but because our basic infrastructure can no longer cope with the rapid growth and density of this area.

I refer to the drains that are in fact under the care of KKR. Areas such as Bandar Bukit Raja, Pandamaran, Bayu Perdana, Meru, Kampung Bukit Raja, Kampung Johan Setia, Taman Teluk Pulai and Jalan Kebun often fall victim to flash floods. Drains that are narrow, clogged and not maintained regularly cause water to not flow smoothly. This situation not only disrupts the daily lives of the people but also affects business operations and public safety. Another issue that is very worrying is the flooding on major highways including the Shah Alam Expressway (KESAS) and the Selat Klang Expressway. Recently, the Kemuning Toll Plaza on the KESAS and the Selat Klang Expressway was reportedly inundated with water, causing severe traffic congestion, including road closures and motorcycle lanes, due to stagnant water that could not be drained properly. When expressways are also flooded, this shows that our drainage system is not only weak in residential and industrial areas but also in the nation's main infrastructure. This situation not only troubles the people but also affects the country's image as a logistics and trade hub. I end with the words— I have repeated myself because I have many points actually, Madam Chairman. I request that a large part of the allocation channelled specifically be kept for the Klang area. The Klang area is the logistics hub of the nation. Moreover, Klang contributes, a— among the largest contributors to the national GDP (KDNK). If we continue doing the same thing and expecting different results, we will waste the people's money. And I hope that KKR, the ministry, will give special attention to all projects approved for the Klang area. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Klang. I invite the Honourable Pasir Salak.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace and blessings of Allah be upon you. Greetings of peace. Madam Chairman, Item 02800 – Repair, Replacement and Upgrading of Roads and Bridges.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

Pasir Salak wishes to draw attention to the increasingly urgent issue of the condition of village roads, particularly the A145 route from Kampung Bandar Air towards Kampung Hujung Rintis. This area is a daily route for residents to go to school, to farms and to workplaces. However, its condition now no longer meets basic safety standards, with a damaged surface, potholes, and standing water when it rains heavily. According to Aishah Ayep, a village resident, she requests that the road be resurfaced because many parts are dented and full of holes. In terms of policy under the meaning of Supply 27, the Ministry of Works, the Federal Government has allocated RM148.05 million, specifically for component 02800 – Repair, Replacement and Upgrading of Roads and Bridges for 2026. This allocation should provide room to address critical needs in the villages, including routes such as those in the Pasir Salak area. However, so far there is no clear coordination on the status of repairs to this road, even though repeated complaints have been submitted. Therefore, Pasir Salak requests an explanation: when is the repair of the A145 village road at Kampung Bandar Air and Kampung Hujung Rintis scheduled in the district JKR's plans, based on the 02800 allocation for 2026? And what is the justification for the delay when the condition of this road is increasingly affecting the safety of users and the local economy? Madam Chairman, Pasir Salak hopes the explanation will be given specifically, including the date, scope of work and method of implementation, so that residents receive the certainty they need.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

Madam Chairman, Pasir Salak also wishes to touch on Item 80000 – Construction of New Roads, which allocates RM2 million for 2026 compared with RM2.287 million in 2025 and RM4.6 million in actual expenditure in 2024. This allocation shows a continuous reduction for new road construction work in the Peninsula. In the context of increasing access needs, especially in areas that do not yet have adequate road connections, this decline needs to be explained. The ministry should state whether this reduction is due to changes in priorities, project rationalisation or postponement of construction.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

Furthermore, when the total road infrastructure development reaches RM4.378 billion for 2026, clarity on the method of selecting locations for new roads is important to ensure that this RM2 million allocation is used optimally and does not cause an access gap between regions. Pasir Salak wishes to request an explanation on whether the ministry has a priority list for new road projects confirmed through technical assessment, and which components will be given priority within this fiscal space that is increasingly shrinking. That is all, thank you, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Pasir Salak. I invite the Honourable Lawas. The Honourable Lawas.

Dato Henry Sum AgongPBB · GPSLawasEN

Thank you, Madam Chairman. On Item 12201 – New Federal Government Offices (outside Kuala Lumpur). The shortage of office space for all Federal Government officers in Lawas, to the point that certain government offices have to rent private buildings for use as offices, needs special attention. For information, the old Federal House that accommodates federal officers in Lawas is now inadequate. I have raised this issue in this august House before and hope it will receive due consideration. To resolve this problem, I request and propose that a new Federal Government office complex be built in Lawas. Item 09280 – Construction of Roads. With the building of a new airport in Lawas to replace the existing airport in the Sundar district area, new road networks need to be created to certain areas, apart from the main road linking to the airport. Accordingly, I request and propose that a road infrastructure be built from Awat-Awat in Sundar towards the new airport and continuing to Punang, Kuala Lawas and to Merapok, the border with Sipitang, Sabah, as a shortcut route and coastal road.

Dato Henry Sum AgongPBB · GPSLawasEN

Earlier, my colleague the Honourable Member for Miri touched on the same matter, namely Item 82000 – Pan Borneo Highway. I would like to extend my highest appreciation and thanks to the government and the Ministry of Works for the implementation of the Pan Borneo road infrastructure in Sarawak, which is now almost fully completed. Congratulations and well done to the contractors involved in making the project a success. Given the length of the road from Sematan in southern Sarawak to Miri in the north, which is approximately 1,000 kilometres, the question arises of building R&R projects along the road. In this regard, I urge the Ministry of Works to provide such facilities at certain locations along the road to give local entrepreneurs room and opportunity to do business, and also to benefit road users by enabling them to enjoy other facilities provided by the government. Madam Chairman, that is all. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Lawas. I invite the Honourable Member for Maran.

Thank you, Honourable Chairman, for allowing me to also debate the Committee on the Ministry of Works. I would like to examine several important items under the Ministry of Works (Kementerian Kerja Raya, KKR) involving road development allocations, highway safety maintenance and the effectiveness of the implementation of KKR projects. I would like to draw the attention of this august House to Item 010000 – Management, which involves an allocation of RM473 million for 2026. I would like to ask how the ministry ensures that the large allocation for administrative management and organisational capacity building contributes to improving the effectiveness of the delivery of infrastructure projects? And what specific improvements are planned for 2026? Dato' Chairman, under Item 010000 – Management, I would like to touch on the digital transformation agenda in the public infrastructure sector to reduce maintenance costs, enhance contract integrity and expedite project approvals.

I would like to ask, what is the current status of the implementation of Buidling Information Modelling (BIM) across the country and what are the current challenges faced? When will the Public Works Department (Jabatan Kerja Raya) fully implement the e-tender system to ensure the procurement process is more transparent? And what is the status of the mandatory use of BIM for all projects valued at RM10 million and above? I would also like to know, what is the compliance rate so far? Dato' Chairman, Item 040000 – Maintenance of Immovable Assets involves RM2.8 billion for the maintenance of federal roads and RM5.6 billion for state roads. However, this large allocation would be more meaningful if its effectiveness, transparency and impact on road safety truly reached the hearts of the people. I would like to ask, what is the actual average cost of maintaining federal roads per kilometre for 2025? And what is the average cost per kilometre used by the Public Works Department in drafting the maintenance allocation for 2026? How does the Ministry of Works address the increase in the cost of maintaining road and building assets so that it does not burden future budgets? And what is the detailed breakdown of the federal road maintenance allocation for 2026 by state? What is the total length of FELDA roads maintained in 2025? And what is the target for maintaining FELDA roads for 2026? And what happened to the JKR in the FELDA sector that was formerly located in various areas within FELDA settlements? What is the total number of secondary roads upgraded up to 2025? What is the distribution of the allocation for federal road repairs in major urban areas and federal road repairs in the states? Mr Chairman, I would also like to request specific information regarding the road in Maran, Pahang, my constituency. The question is, what is the allocation for federal road maintenance specifically for Pahang and the Maran district for 2026? What is the number of complaints about damaged roads in Pahang that were resolved within the SLA period? I ask the ministry to review the need for street lights in the Maran Parliamentary constituency. How much allocation has been disbursed? Solar lights, Honourable Chairman, can also be implemented these days in an effort to save the Ministry of Works' allocation.

I also propose and request that the Ministry of Works review the new alignment of the Kertau Water Treatment Plant road, Chenor, Maran – Road 130 or 133 – which has been repaired dozens of times and involved millions of Ringgit.

I propose that a new alignment and a new route be sought so that this road can always be used properly. Another question I would like to raise: what are the plans for slope repairs in the Peninsula in 2026? What is the maintenance period set by the government for the issues of potholed roads, collapsed slopes and old bridges in 2026? What is the total number of complaints received relating to potholed roads, unstable slopes and dilapidated bridges through MyJalan and— MyJalan in 2024 and 2025? And what percentage of complaints have been resolved for that period? What are the clear criteria for selecting contractors to maintain roads and slopes in 2026? Lastly, Mr Chairman, Item 040200 – Building Facilities Maintenance Branch. I would like to know the position of government houses and government staff quarters placed under the Public Works Department. What is the total number of government quarters under JKR maintenance? How many government quarters are abandoned and not well maintained? What measures does the government take to ensure these quarters are properly managed, to find solutions so that these quarters are not left abandoned, areas that cause losses to the government, and ultimately the surroundings of these quarters are in such a shameful state with overgrown bushes and so on? Mr Chairman, thank you very much.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Maran. Honourable Members, the Majlis resumes as the Majlis Mesyuarat. [Majlis Mesyuarat resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presided

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the sitting is suspended and will resume at 2.30 p.m. Thank you.

[The sitting was suspended at 1.02 p.m.]

[The sitting resumed at 2.30 p.m.]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the sitting] [The House sat in Committee] [Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

[Recited a short prayer] Honourable Member, let us resume the debate. I invite the Honourable Member for Kuala Langat to speak.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Dato' Chairman, for giving me the opportunity to also debate at the Committee stage. I now move to B.27 Ministry of Works, Item 050000 – Special Programmes. Programme or activity 050500 – Payment of Bills for Federal Road Street Lights and Traffic Lights Throughout Malaysia. In 2025, an estimated RM0.2026, an estimated RM49 million. I would like to propose that the need for street lights along the Morib to Tanjung Sepat road, as well as Banting to Klang, FT05, which I believe is among the most complained-about roads to JKR Kuala Langat, of which I have been informed in relation to this lighting, and which also involves accidents that have occurred, as well as the condition of the road which is often full of potholes, especially— although after being patched, pothole programmes are carried out, after rain it causes problems for users, especially during this rainy season. And I propose the use of solar lights as I have seen, and along the KESAS road leading to Pelabuhan Barat in Port Klang and several other places use this solar light method, and it provides very good benefits, although in the initial stage the construction may cost a lot, but it is very cost-saving in terms of the bills that have to be paid.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

Moving on to P.27 Ministry of Works, Highways and Bridges in the Peninsula. Item 60000 – Upgrading of Highways and Routes. In 2025, an allocation of RM142.4 million, and it appears to decrease in 2026 to RM135 million. I see that this WCE, although not yet fully operational because several sections are not yet completed, especially for Kuala Langat, I recall this WCE has started to be used not only as an alternative route, but I see users are increasingly using it. However, I would like to see, I would like to ask the ministry, that there be an upgrade of road PFT 31, between the WCE Banting junction and the FT32 PETRONAS Perindustrian Olak Lempit junction, because this road is still in a two-lane condition, especially during the current peak period it causes very significant congestion and there are also complaints reaching me that have caused delays in reaching KLIA. Whether Terminal 1 or Terminal 2, and flight delays caused by congestion or disruption of the route on this road. I propose that these two lanes be increased to four lanes, and if possible also for a study on usage— a footbridge be built for pedestrians and also cyclists, whether motorcyclists or bicycles, because this road also connects village areas, connecting across the road to schools or across the road to mosques, which I think is very important when the development of these four lanes can be implemented. I think later when the development of Pulau Carey. Pulau Carey Port will become one of the main roads and not only an alternative road, and I think at that time there may also be worse congestion when that development takes place. I would also like to get information from the ministry regarding the latest status. Section 3 of the WCE, 150 metres long, held by 19 landowners or house owners there who still— I do not know what the current status is, perhaps this status is still unresolved. Although 75 per cent of the RM9 million allocated has been given and an extension period for the relocation has also been given. But, it seems as if there is— there is still no resolution yet and I hope this can be done as well as possible because this project has already been delayed for almost two years and I think this will affect the country's financial position and there may also be price increases and so on.

Dato’ Dr. Ahmad Yunus bin HairiPAS · PNKuala LangatEN

And if this can be resolved, I think the WCE, its undulating road, can also be— can be reviewed. I would also like to touch on the FT32 road. A road with waves. If possible, this can also be reviewed and resolved, along with the lighting which also causes problems. For users who often use it perhaps there is no problem. But for outsiders who use it occasionally, there are some areas where if vehicles move rather fast it will cause the vehicles to bounce and may cause accidents in this area. Thank you, Dato' Chairman.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Kuala Langat. Next, I invite the Honourable Member for Padang Serai.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Dato' Chairman. I now move to the topic of our debate today, Head P.27 Item 60000 – Upgrading of Highways and Routes and Bridges in the Peninsula. I would like to mention the upgrading of the North–South Expressway at Juru to Sungai Dua. This expressway is reported to be 17.8 kilometres long and its cost is estimated to be not less than RM3 billion. So, one of the matters of concern to me is that this road is already busy, already congested. So, among the problems that will occur if this construction is carried out are traffic congestion, construction taking place on the existing North-South Expressway alignment, especially between the Juru Toll Plaza and the Sungai Dua Toll Plaza, which is a very high-traffic route.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Today, every day in the afternoon or in the morning, the traffic is very heavy. So, closure of lanes or road diversions is unavoidable when this construction begins and will cause worse congestion during peak construction periods. So, the timeframe for this construction, I have been informed at the launch of this elevated expressway construction, is between 24 months and 48 months. So, even in today's situation, we have already gone through a very congested condition.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

So— Next, the problems that may occur are the impact on local businesses. Construction activities, including earthworks and transport of materials, may affect access and business operations in the surrounding areas, especially at the critical junctions to be upgraded such as the Juru Utara elevated junction (Auto City) and around the new service road. Then, the issue of land acquisition and utilities. Although this project is mostly along the existing expressway alignment, there may be issues relating to land or the relocation of utilities that could delay the work schedule. Then, noise and pollution to residents and users of nearby expressways will be exposed to high levels of noise, dust and air pollution. Dato' Chairman, what I want to say here is that I have previously mentioned that although this project has already been launched and already approved for construction, the government should study— Be able to study to give attention to the NCE Expressway from Changkat Jering to Sungai Petani for phase 1, which may be 78 kilometres in length, but I am confident its cost is much lower because it involves areas without development, forest areas, agricultural areas, privately owned land and so on. So Dato' Speaker, Dato' Chairman, I look at the need. This elevated expressway is to disperse traffic and reduce congestion. So, my view this afternoon is that if we can first build this NCE Expressway over 78 kilometres from Changkat Jering to Sungai Petani, it can disperse traffic within the next few years by diverting it, not passing through Juru and Sungai Dua, but going straight to Sungai Petani for vehicles from the south, from Perak, from Kuala Lumpur and so on heading north. So, after this expressway is completed, perhaps an elevated expressway can be built because there is already an alternative to the North–South Expressway, which is this NCE, and congestion can be reduced. Next, Dato' Chairman, I would like to raise matters concerning my constituency under Item 60000 also Upgrading of Highways. On road FT169, from Kulim Hi-Tech to Sungai Kob, I understand that there has already been an application from the JKR area office to upgrade this road from two lanes to four lanes because the congestion is very severe during peak periods and festive seasons.

Dato' Azman bin NasrudinBERSATU · PNPadang SeraiEN

Also, another one is FT169 from Lunas to Padang Serai, I have also been informed, understood that there has already been an application from JKR to upgrade this road FT136 from two lanes to four lanes. So, Dato' Chairman, that is all I wanted to mention in my debate today. Thank you.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. Next, I invite the Honourable Member for Stampin to speak.

Tuan Chong Chieng JenDAP · PHStampinEN

Thank you, Dato' Chairman. I now move to Item 010200, namely Policy and Corporate Management. I refer to the policy on project implementation management, and specifically to the contract component prices of government contracts that will be affected by the recent rise in transport costs. I urge the ministry to allow contractors who have been awarded government projects, whose contract prices have already been fixed and agreed, to be permitted to raise their contract prices, particularly for those contract components that will be affected by the rise in transport costs. The reason for my call is that recently, the Ministry of Transport has launched the Operation War on Overloaded Commercial Vehicles and will carry out strict enforcement against lorries carrying loads that exceed the permitted load limit. Although in the long term, this step by the Ministry of Transport will elevate the standard of the transport industry in our country and also for the safety of everyone on the road, in the immediate term, that is now, many contractors who have committed to contracts at a certain price for the supply of building materials will be severely affected. Before the launch of that operation, we all know that it was an open and widespread practice in the transport industry, particularly for those carrying gravel, sand, soil, iron and premix and building materials, that the loads they carried were far above the load limit permitted in their permits.

Tuan Chong Chieng JenDAP · PHStampinEN

Most were carrying loads exceeding 50 per cent or more than the load limit stipulated in their permits. When tendering and submitting quotations to bid for government projects, the cost estimates made by them were based on the transport costs prevalent in the industry, namely carrying building materials at 50 per cent above the lorry's load limit. That price was much cheaper than if the materials were carried in compliance with the load limits in their lorry permits. According to industry estimates, with strict enforcement regarding the loads of commercial vehicles, transport costs will certainly rise by at least 40 per cent. The number of goods that can be carried by one lorry in one trip before the enforcement, will now take one lorry, one and a half or two trips to carry. Therefore, if the government— the Ministry of Works does not allow an increase in contract prices that were previously agreed, it will be impossible for most contractors who have been awarded government contracts to carry out their contracts without substantial losses. There is also a possibility that we will be left with many problematic projects. For the good of the construction industry, I urge the ministry to allow a review of the variation of price, of the prices in contracts that will be affected by this strict compliance policy on load limits. The second matter concerns Item 020100 – Policy and Development and also 020200 – Highway Branch. This also relates to the Ministry of Transport, but the main factor determining the Ministry of Transport's decision is from the Ministry of Works. We all know that in Sarawak, the laden weight (BDM) for commercial vehicles that is set at— For lorries and commercial vehicles in Sarawak, it is less than the BDM for commercial vehicles in Peninsular Malaysia. One of the reasons for that difference is the reason given by the Ministry of Works that the Pan Borneo Highway had not yet been completed. Now, the Pan Borneo Highway has already been completed in Sarawak. Therefore, the time has come for the BDM to be raised.

Tuan Chong Chieng JenDAP · PHStampinEN

Therefore, I and— I have received information from the Ministry of Transport that there is no obstacle to raising the BDM for commercial vehicles in Sarawak, except that approval must be obtained from the Ministry of Works for the increase in BDM.

Tuan Chong Chieng JenDAP · PHStampinEN

Therefore, I urge the Ministry of Works to give approval to the Ministry of Transport so that the BDM for commercial vehicles in Sarawak is raised and made equal to the BDM level in Peninsular Malaysia, here. That concludes my speech. Thank you.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. Next, I invite the Honourable Member for Langkawi to speak.

Thank you, Dato' Dr. Chairman. Items 040100, 030900, 08250. Next year, this ministry will receive RM1 billion in operating expenditure and RM9.6 billion in development expenditure. I think this is a good ratio between operating and development expenditure. On page 318, there is mention of Outcome 2: A competitive national construction industry, where the target is 90 per cent for the implementation of Building Information Modeling (BIM) for new projects valued at RM10 million and above. In addition, there is also the implementation of a rating system (rating tools) through QLASSIC and SHASSIC, as well as a target of 1,000 construction personnel who have undergone Building Information Modeling training. I would like to obtain information from the Honourable Member on this outcome in further detail. How many projects valued at RM10 million and above will use BIM next year, and how much involvement will local workers have in this outcome? I would also like to touch on Programme 2: Road Infrastructure Development and Construction Industry Development. As stated on page 320, the Federal Expenditure Estimates, in which the ministry will ensure effective planning and development of road infrastructure and monitor the Maintenance Privatisation Programme so that it meets the specifications that have been

agreed. This relates to Item 040100 as I mentioned earlier, the Road Facilities Maintenance Branch with an allocation of RM12 million. Mr Chairman, we are facing a major question regarding the direction of the Public Works Department (JKR) today. JKR is no longer like the technical agency that once was the backbone of national development. JKR no longer manages quarries, JKR no longer carries out road surfacing works, JKR also increasingly carries out less monitoring of maintenance works. I also wish to refer to Item 03900 – Education Works Branch. In discussing this matter, because it involves the expertise and skills of the officers and staff concerned. The culture practised today sees almost all of these matters fully handed over to concessionaires, namely main contractors and subcontractors who receive projects without clear added value to the people. In some states, works that were previously within the purview of JKR are now handed directly to the Chief Minister's Office, as if JKR is only a name. Professional officers in JKR are also reported to no longer be free to speak out, and there have even been times when the official social media pages of JKR and the Ministry of Works (KKR) themselves chose to block public comments, as if they were more interested in silencing the public than answering the real issues. Most recently, in July, KKR announced that it would appoint external auditors to monitor road maintenance. What is the use of district engineers and JKR officers? I would also like to ask the ministry, how serious is the issue of governance and integrity in KKR? Cases such as the sale of resurfacing materials are not unusual, as if government property can be traded at will without any firm action. In this issue too, malpractice and leakage occur systematically involving certain chains from intermediaries, departments, concessionaires, main contractors all the way down to the layers of subcontractors. Every sen of this budget is a trust from the people. Therefore, as long as there is room for manipulation between the layers of concessionaires and subcontractors, as long as government materials are considered something that can be taken at will, we will continue to see careless road maintenance, substandard projects and the lives of the people being endangered. I do not see a firm commitment from the government to address this issue. Dato' Dr. Mr Speaker, Mr Chairman, I would like to refer to Programme 4: Immovable Asset Maintenance, which can also be linked to Item 08250 –

Slope Protection and Repair Study, under which the government addresses slope and landslide management. The issue of slope management is no longer a small matter. Our country, with its hilly geography and high rainfall, now faces increasingly frequent landslide risks. Every time a collapse occurs, not only is infrastructure destroyed, but the lives of the people are also put at risk. However, is this policy truly being implemented, complied with and updated? We must not deny that the gap between policy and implementation is growing wider. In reality, how many developers, contractors, local authorities (PBT) and even agencies themselves truly comply with slope guidelines without compromise. Thank you, Dato' Dr. Mr Speaker.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Langkawi. Next, I invite the Honourable Member for Tumpat to speak.

Peace be upon you, and God's mercy and blessings. Thank you, Honourable Member, Dato' Dr. Chairman. I refer to Item 010300, engineering excellence, energy efficiency. Regarding the maintenance of the Pengkalan Kubor–Tak Bai ferry, which was launched last September, to date there have been many breakdowns or repairs that have caused delays or disruptions to travel between the two countries and resulted in losses. So, I would like to know, since this is a new ferry, why is there no better solution for this new ferry so that it does not disrupt travel? In terms of regular maintenance or otherwise, I would like to know how many have been repaired and why? And I would also like to propose to the government that all such maintenance be carried out by local people, rather than being sent to or seeking cooperation from parties in Lumut because the cost is very high. That is the first point. Second, we find that with this new ferry, the number of lorries that can board the ferry is roughly the same as before. So, this will cause the space for the people to further boost the economy to be affected. Third, the facilities at the jetty and ferry are not disabled-friendly. So, we hope they can be improved, because when they are disabled-friendly, they will also be friendly for senior citizens, pregnant women and sick people.

Fourth, regarding the condition of the traffic lights at the four-way junction, Cabang Empat Tok Mek Ngah, which causes the road to become increasingly jammed. We understand it has already risen— we request that improvements be made. However, I also want to mention here that under engineering excellence, we need to look at Road FT134 Kota Bharu–Pengkalan Kubor, which is a road that is constantly hit by floods, and in previous years, there were some places that did not flood under JKR roads. But today, that road, for example the road in front of Sekolah Bunohan, has been flooded, preventing relief goods from being delivered to the evacuation centres. Therefore, JKR needs to provide further details to raise the main roads, especially in flood-prone areas. That is the first point. Second, under 030100 – Architecture Branch. We see that many bridges in our country have no specific identity. In other countries that we see, these bridges become historic monuments and tourist attractions, as if they have an identity and a policy. So, in our country, to what extent is it governed by a policy so that the bridges we build at very, very high cost will become historic monuments and tourist attractions? The same goes for the priority of highway construction and management. So, I have repeatedly mentioned LPT3. We also want to know the long-term plan, because we know that the road between Johor and Kelantan should be the backbone, the mobility of the country, which must be given priority in every government action. Under 040100 for the Road Facilities Maintenance Branch. I would like to ask, what is the KPI for roads? Because today we see many roads built, which sometimes can only function for less than five years. Every time there is an election, they need to be renewed, whereas in other countries, we see their roads are more durable. So, what KPI is used, and I would also like to know, to what extent is the cooperation or approval from NIOSH, from KJR, from PDRM for any painting of yellow lines, red lines at accident-prone areas, because today we see that this movement only seems to happen when complaints are made, then only there is action.

So, I would also like to know, how much cost has been spent on roads in Kelantan, the main roads, because we see many of these roads have white paint in the middle that is not visible. When we ask for lines, when we ask, they say there is no allocation, there is no budget. So, is such a budget not included in the government's planning, because this causes accidents especially at night. And also, I know that in public works, this also involves the construction of the ECRL because it involves bridges and also stations.

So, in Kelantan we see that there is a need among the ECRL for it to reach Rantau Panjang. So, several stations and also bridges need further study. Under 00400, I would also like to ask, what— how is maintenance between local authorities (PBT) and JKR carried out at state level, because today we see many delays in repairing roads such as this road when different parties are involved? Likewise with the slope engineering branch under 08250, we see there are protection and repair studies for slopes in Sabah. But I do not see, are there any protection and repair studies for slopes in Peninsular Malaysia? Whereas today, when there are many earthquakes, there was already an earthquake near Johor, there are many floods and disasters, we need to look at these kinds of studies. And I also see that the budget development between 2024 and 2025 is very different when these slopes are repaired, it seems the cost has increased. To what extent is our government looking at and following the Sendai Framework for disaster management for risk mitigation for disasters? And finally, under 02800 for repairing, replacing and upgrading roads. I would like to ask, what is the progress for Kota Bharu Road FT134 for the construction of pavement and concrete drains and footbridges for the roundabout for Pasir Pekan? And also we have applied for a 20000 footbridge for the railway station in Wakaf Bharu. So, I believe that this ministry has the authority for road infrastructure and this footbridge. I hope it can be assisted because it is a need for the people of Tumpat and also the people of Kota Bharu and all of Kelantan because [Unclear] the nearest. And likewise, the progress for the Pengkalan Kubor–

Tak Bai Bridge, which I think is not far or not long. Its length is roughly only 10.6 kilometres. We hope to know the progress today. Thank you.

Mr Chairman (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member for Tumpat. The last debater. I invite the Honourable Member for Kuala Pilah to speak.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and God's mercy and blessings, and peace and well-being. Thank you, Honourable Member, Dato' Dr. Chairman. Kuala Pilah now refers to Item 020000 – Road Infrastructure Development and Construction Industry Development. The KKR Ministry now sets a target of 90 per cent of projects valued at RM10 million and above to be implemented using Building Information Modeling (BIM), or BIM by 2026. Kuala Pilah fully supports this direction because it can reduce waste and increase cost transparency. However, the use of BIM is still low among small and medium contractors. Kuala Pilah suggests that the ministry add training allocations under JKR, CREaTE so that more local contractors can acquire digital skills that are in line with global industry standards. At the same time, the concept of green infrastructure and sustainable design must go through initiatives such as MyCREST, and INFRASTAR must be continued so that every road and government building development project is not only of high quality but also contributes to reducing the country's carbon footprint. Dato' Dr. Mr Chairman, Kuala Pilah refers to Item 040000 and also immovable Item 040100 – Road Facilities Maintenance. The ministry needs to pay attention to the performance of road maintenance concessionaires who receive tenders for maintenance works under the Federal Road Maintenance Privatisation Programme. There have been complaints about poor-quality patching works and delays in repairs in several rural stretches. Kuala Pilah proposes that the ministry establish a more transparent and accessible KPI performance evaluation system for concessionaires to ensure more effective monitoring. Contractors who fail to achieve KPIs must be reviewed

...to be reinstated or have its contract terminated early, so that only companies that are truly capable are awarded supervision contracts. Referring to Item 31000 and also 60000. Kuala Pilah wishes to obtain the latest status of the Tanjung Ipoh–Beting bypass project, which local residents hope will reduce congestion and improve road safety. It was informed that two phases have been approved, namely Phase 1 Tanjung Ipoh–Beting and Phase 2 Tanjung Ipoh–Ulu Bendul. Since this project has been on the ministry's planning radar, Kuala Pilah wishes to obtain an explanation of the latest status, including the progress of the value assessment and value engineering for both phases. The timeline for the design and tender work and the estimated schedule for physical implementation. Kuala Pilah hopes this project can be expedited because it brings great value to the safety and comfort of road users, the reduction of congestion, and the improvement of economic access in the areas around Tanjung Ipoh, Terachi and also Beting. Kuala Pilah refers to Item 60000 – Upgrading of Roads and Routes. The Bukit Putus–Terachi road is still a narrow two-lane road. The quality of travel along this stretch is increasingly affected because the road capacity is not commensurate with the annual increase in traffic in the areas around Bukit Putus and Terachi. Kuala Pilah proposes that the Ministry of Works expedite the plan to enlarge and widen this road, including reassessing the engineering design at several sharp bends identified as high risk. Honourable Dato' Dr. Chairman, this project is not merely a matter of convenience but a matter of safety. The Bukit Putus–Terachi stretch is an important route linking tourism, agriculture and education areas. Therefore, the enlargement and widening of this road will have a direct impact on the local economic security and the quality of life of residents. Honourable Dato' Dr. Chairman, the journey from Seremban to Kuala Pilah usually takes only 30 to 45 minutes. However, during traffic congestion, it can result in jams lasting five to seven hours. Accordingly, Kuala Pilah proposes that the programme or road widening from Bukit Putus up to Kampung Sawah Liat, Ulu Bendul be continued earlier because

the original objective of the alignment or widening of the road was to enlarge FT51 between Seremban and Kuala Pilah. But it was stopped halfway. And therefore, Kuala Pilah proposes a three-lane widening. If the cost of the originally four-lane design is somewhat high, then with the proposal of a three-lane widening, with permission, adjustments can be made when traffic congestion occurs at any time. And for this reason, once again Kuala Pilah proposes that the ministry consider reactivating the widening of this road, because it will to some extent reduce the congestion and pressure, the tension that arises every time there is heavy traffic, heavy traffic flow between Kuala Pilah and Seremban. The construction of Item 81000, the Seremban–Kuala Pilah–Serting route, can be said to be among the busiest main roads in Negeri Sembilan, and it has long hampered traffic flow and burdened the surrounding residents. As for the bypass, the Seremban–Kuala Pilah–Serting bypass project is seen as a solution that can reduce congestion and drive the development of the central region of Negeri Sembilan. With the private sector having expressed interest, and also receiving serious attention and priority from the state government through the Most Honourable Menteri Besar of Negeri Sembilan, MP, that is, Member of Parliament for Port Dickson, Kuala Pilah hopes the ministry will expedite the implementation of this project through the Private Finance Initiative (PFI) method with any capable company. This project should be given priority in the planning of new road development because its benefits are not only for Kuala Pilah but also for the entire connecting route between Seremban, Jempol and onward to the East Coast. Finally, Honourable Dato' Dr. Chairman, Kuala Pilah supports the efforts of the Ministry of Works in strengthening the national road network. However, projects that have a direct impact on the economic security of rural areas should be given priority. Therefore, thus, Kuala Pilah supports. Thank you, Honourable Dato' Dr. Chairman.

Mr Chairman (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Kuala Pilah. Now is the time for the Minister to respond. The time allocated is 30 minutes. Minister, please proceed.

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

Assalamualaikum warahmatullah. Peace be upon you. Good afternoon. Salam Malaysia MADANI.

Mr Chairman (Dato' Dr. Ramli bin Dato' Mohd Nor)

Waalikumsalam.

Thank you, Dato' Dr. Mr Speaker. The Ministry greatly appreciates all Members of Parliament who have made speeches, views, criticisms and, as the pantun says:

In the garden, lost in reverie, As high as the sky, with a full sail; Members of Parliament propose development, For the struggle, the people's well-being.

The answers are still coming to my desk, and I have told the officers that if a Member of Parliament should not have their answer broken up, because one Member of Parliament sometimes gives three or four points. So, I am trying my best. Bentong, Hulu Selangor, Sri Aman, Besut, and I have noted them all. My personal notes and also the officers' notes. Rasah, Alor Setar, then Sri Gading, Kuala Nerus, Miri, Arau, Balik Pulau, Jeli, Klang, Pasir Salak, Lawas, Maran, Kuala Langat, Padang Serai, Stampin, Langkawi, Tumpat and Kuala Pilah.

Everything has been recorded well, Dato' Mr Speaker, whether they are here or not here, I have tried to answer to the best of my ability. As mentioned, it is true that of the 28 ministries, the Ministry of Works (Kementerian Kerja Raya) received the highest development expenditure (DE), or development expenditure. We have 28 ministries in our country. Number one, indeed it is us with RM9.607 million – RM9.6 billion, 357 project items. Of the 357 project items for next year, new items – 109 new items. Continuation items – 228 items, maintenance items – 20 items. How much are their values? Indeed, they increase year by year. For example, in 2024 RM8.561 billion, in 2025 (RM9.327 billion),

in 2026 (RM9.607 billion). Of these matters, roads and bridges have the largest allocation at RM2.642 billion, slopes (RM168 million), buildings (RM167 million). The total of RM2.978 billion is in terms of maintenance allocation, not construction, yes, maintenance. Then, for next year, the state that receives the highest allocation of all other states is Sabah. Sabah receives RM2.175 billion, Sabah. We are currently having the Sabah State Election, yes. So I wish to announce that, of all the states, the highest is Sabah. Second, the highest state is Sarawak, RM1.915 billion. What are among the items of the RM9.607 million? Among them is the Pan Borneo Sabah-Sarawak – RM1.3 billion. Then, Sabah-Sarawak Link Road – RM300 million (Phase 1), Phase 2 – RM300 million. Then, Trans Borneo Highway – RM200 million. The Main Central Ring that involves Kelantan-Pahang – RM782 million. Kota Bharu-Kuala Krai, this is for us to resolve, RM305 million. PLUS additional lanes, this is in the state of Johor. Phase 1 – RM200 million, Phase 2 – RM150 million, Phase 3 – RM55 million, Phase 4 we just mark it first, RM800,000. Then, there are other overtaking lanes. These are among the list; earlier, some Honourable Members asked about the list. I have answered some of it. For me, let me move on one by one. This is thick, one by one. First, Bentong mentioned several matters. Bentong has mentioned several matters. I would like to inform the Honourable Bentong that among the measures to be implemented in the works area of the KL–Karak Highway widening are: installation of spill lights, especially at risky locations and bends, and we also ensure that a comprehensive traffic management plan is implemented, with road barriers, flashing warning lights, and traffic management. We want to enlarge this highway as early as possible, and we must follow all technical standards and standard operating procedures (SOP), and the traffic team will work 24/7 to ensure the situation remains under control, with emergency action and so on. At present, the installation of new reflectors on the median is being carried out in phases, together with the upgrading of the NJB (New Jersey Barrier) median works, road line maintenance works carried out to ensure the level of reflectivity complies with standards, and re-marking of road lines at locations where road lines have been found to be faded.

YB Bentong, under RP5-RMK12, the ministry has raised to the Central agency the matter of the Ketari Junction, which has LTU status. We also hope that the Pahang State Government can take it up to make it a main priority for Bentong. Next, the application to upgrade the Ketari junction located on FT8, Jalan Bentong-Gua Musang. We need to obtain it from the state too, yes. Bentong is in good relations with the state government, so of course this matter can be looked into by the state government.

Honourable Deputy Minister, may I ask a short supplementary question.

Dato' Chairman, earlier I did not have time to ask about the very hot issue these past few days, namely the decision by Genting Highlands to impose private road charges. So as an MP, I of course have met with Genting Highlands and heard their comments myself. However, because they have incurred a very large cost since the 1960s, I would like to ask the ministry, considering that this is private land and there has never been a case of toll construction on private land, what steps will the ministry take in the future to address this issue? And can a toll indeed be imposed by a private party, especially when that land is state government land granted at a premium to a company, and it is also a route that has long been used by the public, especially from Genting Sempah to Batang Kali, which people indeed frequently use from Pahang to the state of Selangor. So, I ask for an explanation from the ministry. Thank you.

That is indeed a hot issue now, mentioned in the newspapers and also in questions from the public. I wish to clarify that the Honourable Minister of Works has issued a media statement, among other things stating that the road is a private road, and the Federal Government has no connection with that private road. What is relevant is the state government and the Bentong Municipal Council, to ensure how it is implemented. In our view, please do not use the word toll, because it causes confusion with the 33 toll concessions on the highways. Therefore, I think it may be changed to vehicle charges. What would be the effect of vehicle charges on Genting Highlands? I think if they set a high price, fewer tourists will come to the place. That is a risk they must take. Tourists will go to other places that do not have charges or are not private roads. And in my personal view, I think workers should not have to be charged. Then, those who own land there are not only owned by Genting, perhaps Genting has sold to other parties. For example, there are hotels that have been built not by Genting. I think that matter needs to be negotiated by their side. We have the Aminuddin Baki Institute there. Surely they also want to be charged? So I think Jalan Batang Kali to there, which is a public route, I think should not be charged.

used because it causes confusion with the 33 toll concessions on the highways. Therefore, I think it may be changed to vehicle charges. What would be the effect of vehicle charges on Genting Highlands? I think if they set a high price, fewer tourists will come to that place. That is a risk they have to take. Tourists will go to other places that have no charges or are not private roads. And in my personal view, I think workers should not have to be charged. Then, the people who own land there are not only owned by Genting; perhaps Genting has sold to other parties. For example, there are hotels that were built not by Genting. I think that matter needs to be negotiated by their side. We have the Institut Aminuddin Baki there. Surely they also do not want to be charged. So I think Jalan Batang Kali leading to there, which is a public road, I think should not be charged.

[Bangun]

Only those who want to go and enjoy themselves up there, I think it is fair that they be charged. For those who pass through it for social purposes...

Menteri.

...I do not see that it should be charged, and that is my view.

I want to ask a little, Chairman.

Please, please, but this is a matter for the state government.

Related to the same thing. If it is to be called a private charge, would this require an amendment to any act? Because I believe, even if we allow anyone to do anything, there must be a policy and a special act, because this will lead to many more cases after this.

So, has the government already got a policy or act related to private charges like this? Thank you.

Yes. What— in my view, yes, as I have always informed this House, there are 11 types of roads in our country. Under this Ministry of Works, we only carry out the responsibilities of Federal Roads and also highways. At the state level, then state roads, MARRIS allocations have been raised by various Honourable Members who asked. The MARRIS allocation is not under the Ministry of Works, but under the Ministry of Finance. They carry out the responsibility under the Constitution of providing MARRIS allocations according to the length of road in the relevant state area. There is a formula. Thus, the Ministry of Finance should answer questions on MARRIS allocations by state, and I know that in an important meeting of the previous government, we decided that MARRIS allocations are not only for state roads, but also for city roads, MARRIS allocations can be used for village roads, MARRIS allocations can be used. There are Honourable Members who raised specific road names, and it turns out those roads are state roads. Then the road that was damaged turned out to be a road under the (KKDW) Ministry of Rural and Regional Development; some Honourable Members raised this matter, and MARRIS allocations can also be used for that. Previously only state roads, but now township roads can, city roads can, village roads can, agricultural roads can. These private roads, private roads— I think land matters are the responsibility of the state government, and roads built on land under the state government's jurisdiction are also under the state government. If there are certain particular regulations, I think it would naturally involve the relevant municipal council. So, whether there is a specific provision under KPKT (Ministry of Housing and Local Government), yes, I hope there are matters that we can determine through KPKT. A specific act under the municipal council to address the issue of private roads. That is enough, yes. Bentong has gone on long enough. There are still many more, [Laughter] it has been 16 minutes already. Hulu Selangor, upgrading of drains on FT1 flash flood at Kampung Sentosa, Seri Cahaya, upgrading of Rasa junction, street lights at Hulu Yam Baharu. I would like to inform you that the state has not submitted any application under RP1, RMK13. Then Rasa junction, the state also has not applied; the third, Batu 23 Ulu Yam Baharu,

B66 Batang Kali–Genting Highlands is a state road, therefore it needs to be referred to the state government for adding street lights on that road, and MARRIS allocations can be used. Next, Sri Aman, street lights on the Pan Borneo Highway in the Sri Aman area; we will consider these street lights on that route if they meet the criteria, if it is a blackspot, if it is a junction. We want to install street lights along the entire highway, but we do not have that capacity. Therefore, we have other methods, for example reflection at the edge of the guard rail, for instance. That can help for safety. The capacity to light up all roads across the whole of Malaysia is not possible because of the high cost. So, I apologise for that matter; only at blackspots will we install solar lights, and also at junctions, perhaps in certain town areas, we install lights. Besut— Besut is nice today. He asked politely about everything, yes. So, [Laughter] I would also like to mention Besut's matter politely. For the year 2025, the ministry has allocated RM2 million for periodic maintenance works of pavement and non-pavement on the FD189 route. Overall, we have allocated 9.123 million to carry out maintenance works on the federal route in the Besut district. That is quite a lot indeed. For 2026, the PWD (JKR) is preparing the Work Orders for 2026, which will be submitted to this ministry based on the priority list. As for this, Besut asked about the Besut Bridge. For this, I personally attended the bridge and informed that the Federal Government agreed to build a bridge across the Besut River on Jalan Jerteh Besut, Terengganu. And the current status of the tender is expected in mid-December, Honourable Besut, expected to enter the site in April 2026 and the estimated cost is 124 million, a big amount for Besut. Pontian did not even get much. But we considered that place to be congested and so on, and improvements are needed in that area. Next, YB Rasah. Yes, the traffic and social impact study for the project to build the Seremban Central Ring Road, we approved that traffic study at RM750,000. We want to conduct the traffic study first. This Rasah matter has several parts. Alor Setar is interesting today, Alor Setar is also in a good mood today, yes, talking about motorcycles because he is a motorcycle rider.

Tuan Cha Kee ChinDAP · PHRasahEN

Deputy Minister, Deputy Minister. Rasah.

Rasah has more after this.

Tuan Cha Kee ChinDAP · PHRasahEN

More after this? Okay, okay.

Ada lagi, ada. Kertas-kertas ini ber— putus-putus. [Ketawa] Yang Smart Lane ini Honourable Member for Alor Setar, tentunya kita buka hanya pada tarikh tertentu ketika hari raya, perayaan apabila terlalu sesak waktu-waktunya, baru kita buka. Jika tidak, kawasan Smart Lane yang merupakan kawasan laluan kecemasan itu boleh diguna oleh pelbagai pihak. Termasuklah motosikal. Saya adalah pengguna lebuh raya yang tegar Honourable Member. Perjalanan dari KL ke Pontian mengambil masa tiga jam. Dua jam setengah saya lalu lebuh raya. Jadi, apa yang Honourable Member sebut ini saya faham sangatlah tentang perkara ini. Dan kita mengucapkan terima kasih lah kepada Honourable Member kerana Smart Lane ini merupakan satu inisiatif, quick win high impact bagi pengurusan trafik pada ketika sesak. Dan dia tidaklah selalu diadakan Smart Lane itu kecuali pada ketika-ketika yang tertentu sahaja. Termoplastik atau high performance thermoplastic jenis all weather itu, itu adalah garisan jalan yang digunakan dan ia diguna pakai oleh LLM (Malaysian Highway Authority) menggunakan Guidelines of Expressway Road Marking. Oleh itu standard di mana-mana apa yang kita guna. Kalau dia licin sikit itu, kita kena berhati-hatilah supaya tak ada cara lain pun ya thermoplastic itu. Tetapi dari semasa ke semasa tentu ada kaedah-kaedah. Sebagai contoh ada datang ke kementerian bagaimana mereka ada kaedah untuk mengelakkan jalan licin. Ini satu teknologilah. Tetapi kita masih lagi memeriksa cadangan itu, bagaimana jalan di selekoh, di corner boleh dipasang dengan jenis bitumen yang tertentu menyebabkan jalan itu tidak lagi licin. Ada— semua sekali ini ada tujuh perkaralah disebut tentang Alor Setar ni. Saya akan bagi Alor Setar detail banyak tentang, satu tajuk detail banyak. [Ketawa] Kadang- kadang orang satu tajuk tak ada detail pun, tetapi ini satu tajuk banyak betul saya hendak bagi kepada Alor Setar. Saya letak kat tepi ini supaya lepas ini. Boleh bagi Alor Setar sekarang? [Sambil menunjukkan dokumen] [Ketawa] Okey. [Bentara mengambil jawapan bertulis daripada Honourable Deputy Minister untuk diberi kepada Honourable Member for Alor Setar]

Something different this time, is there a deal?

Oh, [Ketawa] Sri Gading. Sri Gading juga menyebut tentang laluan motosikal lebuh raya. Ini boleh kongsilah jawapan itu, Sri Gading dengan Alor Setar. Pembangunan semula bangunan R&R di lebuh raya ini untuk jadikan co-working space, family space.

Saya ingin maklumkan di— R&R Ayer Keroh khususnya disebut. Ini pun tempat laluan kita lah, Sri Gading. Sri Gading–KL, Sri Gading–KL–Simpang Renggam– Sedenak–Pontian. Jadi, kita tahulah tempat itu. Macam berhantu je tempat itu kan. Oleh itu, nak disebut di sini bahawa bangunan hotel R&R berkenaan sedang diteliti untuk dibangunkan semula dengan cadangan infrastruktur kenderaan elektrik iaitu hab pengecasan kenderaan elektrik berkelajuan pantas. Pembangunan berkenaan juga akan mengambil kira penyediaan ruang niaga baharu yang lebih mesra pengguna bagi memenuhi keperluan semasa pengguna lebuh raya. Kemudian, Sri Gading juga naik taraf Jalan Parit Botak dan Jalan Seri Bengkal, J9 dan J125. Oleh kerana namanya pun J, Honourable Member Sri Gading, J maksudnya Johor lah. Jadi dia jalan negeri. Kalau FT, itu Federal Trunk. Itu Jalan Persekutuan. Itu ikut dia punya— saudara-saudara boleh, Ahli-ahli Honourable Members boleh perasan kalau FT itu Jalan Persekutuan. Tetapi kalau J9, J125 ini ia adalah laluan jalan negeri. Oleh itu, bidang kuasa laluan tersebut terletak di bawah penyeliaan dan selenggaraan kerajaan negeri untuk Jalan Parit Botak dan Jalan Seri Bengkal.

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

Boleh nak tanya sedikit?

Tuan Haji Aminolhuda bin HassanAMANAH · PHSri GadingEN

Pertama sekali lah, terima kasih kepada Timbalan Menteri yang telah berikan jawapan yang baik. Cuma satulah, adakah kerajaan negeri boleh buat permohonan kepada Federal untuk naik taraf jalan berkenaan sebab kawasan itu memang selalu sering berlaku kemalangan. Dan kemalangan itu, biasanya maut lah sebab kereta laju-laju. Dia tak ada space ataupun ruang untuk kenderaan kecil, motosikal. Itu antara persoalannya lah. Seandainya boleh, maka mungkin boleh dicadangkan kepada kerajaan negeri untuk mohon permohonan tambahan untuk nak ambil tanah dan sebagainya. Terima kasih.

Kaedahnya jika jalan kerajaan negeri nak dijadikan Jalan Persekutuan, dia ada kaedah, ada permohonan dan

sebagainya. Ada dua, tiga jalan di negeri Johor. Jalan negeri jadi Jalan Persekutuan dan akhirnya, Jalan Persekutuan itu boleh kita naik tarafkan kerana kemungkinan kerajaan negeri ada apa ini bajet yang terhad dan ini boleh dibuat. Saya kira Honourable Member boleh menulis kepada kerajaan negeri dan Kerajaan Persekutuan di dua surat yang s.k. salinan kepada masing-masing. Itu cadangan. Miri, apakah perancangan kerajaan mengenai Seksyen Lambir, WPC11? Keadaan yang baik, berfungsi tahap maksimum. Ini jajaran ya LPB, Pan Borneo Sarawak. Keseluruhan jalan telah siap sebenarnya, dibuka kepada pengguna awam. Ada sedikit sahaja lagi, itu yang belum. Kita akan pastikan keperluan kritikal, pengalihan paip air milik itu di jajaran tersebut kena segera disiapkan. Saya ingin menyebutlah LPB Sarawak ini selain daripada sedikit je perkara itu. Jadi 99 peratus siap. Saya harap perkara ini boleh segera. Kemudian, kerja-kerja awalan untuk naik taraf Jalan Bulatan Puchong–Sungai Lutong yang disebut oleh Honourable Member for Miri. Jangkaan tarikh siap bagi kerja-kerja awalan ialah pada pertengahan tahun 2026. Honourable Member for Arau, dia tak ada di sini. Honourable Member for Balik Pulau, ada? Ada ya. Berdasarkan kelulusan projek RP1 RMK13, terdapat tiga projek yang diluluskan oleh Kementerian Ekonomi (Ministry of Economy) yang berkaitan, yang disebut di Pulau Pinang, Balik Pulau. Pertama, kerja awalan projek naik taraf Jalan FT006 dari Bayan Lepas ke Teluk Kumbar, Seksyen 20 hingga Seksyen 23. Kerja awalan yang kedua, kerja awalan naik taraf laluan Persekutuan FT001 dari Persimpangan Permatang (Seksyen 720) ke Jambatan di atas Sungai Junjung (Seksyen 740) Simpang Ampat, Seberang Perai, Selatan menggantikan Jambatan FT311 yang merentasi sungai di Jalan Persekutuan FT311, Seberang Perai Tengah. Bagi kerja awalan di FT006 Teluk Kumbar, jajaran terlibat di Seksyen 20 hingga Seksyen 23 melibatkan kawasan missing link di kawasan ini. Tulisan engineer macam doktor juga tulisan. Jadi, saya ya lah— saya dah beritahu mereka ini.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Honourable Chairman, Honourable Minister.

Ya. Gurau, gurau.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Honourable Minister, Honourable Chairman.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Minta penjelasan sedikit.

Kuala Nerus, tentang apa?

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Kuala Nerus sudah terlepas itu, saya ingat. Saya ada tanya tentang empat jalan tadi. Kuala Nerus. Pertama, Jambatan Buluh Gading. Yang kedua, Jalan Manir, Gong Badak. Yang ketiga, missing link Bandar Baru Kuala Nerus ke Jalan Kelantan. Yang keempat, tambahan tadi Hulu Terengganu, jalan sambungan LPT2 ke Kuala Jeneris untuk ke Kenyir dan juga Setiu untuk luluskan jalan di sempadan Kuala Nerus–Setiu.

Saya sebenarnya Dato’ Chairman, saya boleh jawab semua. Ada semua sini tetapi perlu tiga jam sebab banyak isu-isu, detail dan sebagainya dan jawapan mereka juga detail. Saya kira pastinya akan dijawab secara bertulis kepada semua ini tetapi ada...

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Bertulis pun okey. Bertulis pun okey, tak apa. Terima kasih.

Terima kasih atas— baik betul hari ini pembangkang semua. Jeli, Kelantan. Jeli ini kawan-kawan saya.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Pembangkang semua baik-baik.

Jeli ini kawan lama. Seksyen 198 hingga Seksyen 224.9, Jeli, Kelantan. Lulus Jeli ya. Honourable Member for Jeli, saya ingin maklumkan bahawa antara skop utama yang terlibat ini Lebuhraya Jeli–Perak ini. Nama lebuh raya tetapi duduk dua lorong je. Sebab itulah jalan paling besar sebelum ini itu sebab panggil lebuh raya, dan kita akan membina lorong memotong sepanjang dua kilometer, menaik taraf permukaan jalan, pembaikan cerun, menaik taraf pembetung, pemasangan lampu solar, untuk lulus dalam RP1 Rancangan Malaysia Ketiga Belas. Jalan yang kita naik motosikal itu. Tadi Jeli ada sebut, saya naik motosikal ketika beliau bersama-sama lah dalam parti yang sama. Sekarang ini parti beliau ini lain sedikit ya sebab dia duduk di tengah. Jadi kami dah tak adalah berapa naik motosikal lagi. Tetapi kawan tetap kawan. Ini pemasangan lampu jalan, laluan tersebut akan mempertimbangkan pemasangan lampu jalan atas faktor keselamatan di Jalan Jeli–Gua Musang, laluan Jalan Batu Gajah, Rawang sebab dia jadi jalan alternatif apabila berlaku waktu-waktu sesak dan waktu-waktu apa ini hari-hari cuti panjang. Seterusnya apa lagi ini, Klang. Ya, saya faham apa yang disebut oleh Klang bahawa jalannya selalu rosak. Kita sedang mencari beberapa kaedah. Ada beberapa

kaedah alternatif dari segi pembuatan jalan. Ada kaedah daripada PETRONAS menggunakan plastik campur bitumen. Ada kaedah daripada syarikat menggunakan crumb rubber campur bitumen iaitu tayar-tayar terpakai. Ada kaedah yang digunakan di Amerika Syarikat dipanggil HIMA telah dibuat dilaksanakan di satu persimpangan empat di Jalan Kota Bharu. Inisiatif sendiri yang dibuat dan dilapor kepada JKR (Public Works Department) dan kita— JKR ada meminta syarikat berkaitan satu seksyen di Klang yang mana jalan tersebut boleh tahan lama menggunakan kaedah yang digunakan dengan teknologi yang disebut itu. Jadi, dia bukan hanya untuk Klang tetapi juga untuk kawasan-kawasan lain yang jalannya selalu rosak. Dato’ Chairman, sebagai mana saya sebut 30 minit memang tak cukup mengenai BIM dan sebagainya itu, Building Information Modelling. Ada beberapa yang menimbulkan. Kita akan ada apa yang dipanggil sebagai makmal BIM di setiap negeri. Jadi apabila kita ada makmal BIM setiap negeri mulai tahun depan, kontraktor-kontraktor boleh menggunakan makmal tersebut dengan caj yang tidaklah mahal, jika mereka menggunakan perisian yang dibeli sendiri. Itu antaranya – antara beberapa perkara yang disebut. Selain daripada itu Ahli-ahli Honourable Members, kaedah untuk memastikan tempat kita terjaga dari segi jalan dan sebagainya ini, hendaklah melalui UPEN (State Economic Planning Unit) negeri dan juga exco kerajaan negeri. Jika mereka meletakkan pada prioriti utama, maka pada tahun seterusnya Honourable Member akan dapat segala permohonan itu.

Walaupun dari negeri Perlis, walaupun dari negeri Kedah, walaupun dari negeri Kelantan dan juga Terengganu, ini Kerajaan MADANI yang baik, yang berlaku adil kepada semua. Terima kasih Honourable Member.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Terima kasih Honourable Minister. Baik, Honourable Member, masalahnya ialah wang sejumlah RM1,084,692,100 untuk kepala B.27 Anggaran Perbelanjaan Mengurus 2026 jadi sebahagian daripada jadual hendaklah disetujukan. [The question was put for decision, and agreed to] [Head B.27 ordered to form part of the Schedule]

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Baik, Honourable Member, masalahnya bahawa perbelanjaan di bawah kepala P.27 dalam Anggaran Perbelanjaan Pembangunan 2026 hendaklah diluluskan. [The question was put for decision, and agreed to] [Head P.27 ordered to form part of the Estimates of Expenditure]

Bill — Supply Bill 2026 and Development Estimates Motion 2026 Committee — Head B.28 [Schedule] – Head P.28 [Development Estimates 2026] –Bill

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Members, ke kementerian yang selanjutnya iaitu Ministry of Transport (Kementerian Pengangkutan). Kepala Bekalan B.28 dan Kepala Pembangunan P.28 di bawah Ministry of Transport terbuka untuk dibahas. Dalam senarai yang berada dengan saya ini, terdapat 18 Honourable Members akan berbahas. Senarai berkenaan adalah seperti berikut; Honourable Member for Klang, Honourable Member for Jerantut, Honourable Member for Miri, Honourable Member for Merbok, Honourable Member for Tampin, Honourable Member for Bukit Gantang, Honourable Member for Bakri, Honourable Member for Setiu, Honourable Member for Petaling Jaya, Honourable Member for Padang Rengas, Honourable Member for Shah Alam, Honourable Member for Pengkalan Chepa, Honourable Member for Bangi, Honourable Member for Padang Serai, Honourable Member for Beruas, Honourable Member for Kuala Krai, Honourable Member for Rantau Panjang dan akhirnya Honourable Member for Jelutong. Masa diberi lima minit dan ini dan saya mempersilakan Honourable Member for Klang untuk membuka tirai.

Dato’ Chairman, terima kasih kerana memberi saya ruang untuk turut serta dalam perbahasan berkenaan Ministry of Transport dalam Sesi Belanjawan 2026 ini. Saya amat menghargai peluang ini untuk membawa suara rakyat Klang yang sangat bergantung kepada sistem pengangkutan awam yang cekap dan berdaya saing. Berdasarkan Belanjawan 2026, Kementerian Pengangkutan diperuntukkan sebanyak RM6.768 bilion yang merangkumi RM1.659 bilion untuk Perbelanjaan Mengurus dan RM5.109 bilion untuk Perbelanjaan Pembangunan secara langsung. Namun, saya ingin tahu secara khusus berapa banyak daripada peruntukan yang akan dibelanjakan untuk pembangunan infrastruktur pengangkutan awam Klang. Klang

adalah kawasan yang padat, aktif dan penyumbang besar kepada ekonomi negara. Maka, perbelanjaan untuk pengangkutan awam di sini bukan sekadar keperluan, tetapi satu pelaburan strategik. Maka, saya ingin mendapatkan maklumat terkini berkenaan status projek LRT Laluan Shah Alam (LRT3) dan Laluan Rel Pantai Timur (ECRL), yang melibatkan kawasan Klang. Adakah LRT3 benar-benar akan mula beroperasi sepenuhnya menjelang penghujung tahun 2025 seperti yang dijadualkan? Dan apakah langkah-langkah yang sedang diambil untuk memastikan kesiapsiagaan operasi? Selain itu, apakah perkembangan terkini bagi Jajaran ECRL yang melalui Klang dan bilakah dijangka ia akan mula beroperasi sepenuhnya? Rakyat Klang amat berharap agar kedua-dua projek ini dapat disiapkan mengikut jadual dan memberi manfaat langsung kepada mobiliti serta ekonomi setempat. Saya juga ingin bertanya sama ada peluang pekerjaan, kontrak penyelenggaraan dan pengurusan operasi LRT3 dan ECRL ini akan diberi kepada penduduk Klang? Kita perlu pastikan bahawa pembangunan ini turut memberi manfaat ekonomi kepada komuniti setempat, bukan hanya kepada syarikat luar. Dato’ Yang di-Pertua, dalam Belanjawan 2026, sebanyak RM7.9 bilion telah diperuntukkan untuk TVET, termasuk RM3 bilion oleh HRD Corp untuk latihan dalam sektor teknologi tinggi dan pengangkutan, serta RM1.3 bilion kepada institusi TVET, KPM (Ministry of Education Malaysia). Pada tahun akan datang, saya sarankan Kementerian Pengangkutan bekerjasama dengan pihak KPM untuk memperkasakan latihan lokomotif dan marin dalam kalangan anak-anak muda di Klang. Latihan melibatkan pengurusan sistem rel, penyelenggaraan tren, operasi LRT dan perkapalan harus dimartabatkan di Bandar Raya Klang. Institusi dan infrastruktur pendidikan berkaitan bidang lokomotif dan marin ini harus dibawa ke Klang, memandangkan Klang merangkumi infrastruktur pengangkutan yang megah seperti LRT3, KTM, ECRL dan Pelabuhan Klang. Saya percaya bahawa pemerkasaan latihan ini akan menarik minat anak-anak muda di kawasan Klang untuk menceburi bidang tersebut, membawa pembangunan dan membina kerjaya yang stabil. Saya juga ingin membangkitkan isu infrastruktur jalan raya di sekitar stesen LRT, walaupun LRT menawarkan penyelesaian kepada kesesakan, jalan-jalan di sekitar stesen seperti Bandar Baru Klang, Bukit Raja dan Johan Setia sering sesak dan tidak

diselenggara dengan baik. Saya mohon agar peruntukan khas daripada pembangunan Kementerian Pengangkutan digunakan untuk menaik taraf jalan dan membina laluan pejalan kaki yang selamat dan memasang papan tanda yang jelas di sekitar stesen LRT. Ini penting untuk memastikan akses stesen tidak menjadi punca kesesakan yang baru. Saya menyambut baik langkah Jabatan Pengangkutan Jalan (JPJ) (Road Transport Department), dan Kementerian Pengangkutan yang memperkenalkan SOP dan garis panduan baru terhadap kenderaan berat, termasuk larangan penggunaan lorong kanan dan penguatkuasaan terhadap muatan berlebihan. Langkah ini penting untuk meningkatkan keselamatan jalan raya. Memandangkan statistik menunjukkan peningkatan kemalangan melibatkan lori. Namun, dalam melaksanakan peraturan ini, saya ingin menggesa agar pengusaha lori diberi masa yang mencukupi dan sokongan kewangan yang bersesuaian untuk menyesuaikan diri dengan peraturan baru. Berdasarkan Belanjawan 2026, kerajaan telah memperkenalkan insentif kepada penguasa kenderaan berat untuk memasang alat pengehad kelajuan, speed limitation device (SLD) melalui elaun modal khas. Saya mohon agar peruntukan dan insentif seperti ini juga diperluas kepada pengusaha lori yang terkesan dengan pelaksanaan peraturan muatan agar mereka tidak terbeban secara mendadak dan dapat terus beroperasi dengan selamat dan berdaya saing. Jika beban ini diletakkan secara mendadak ke atas pengusaha lori, ia boleh menyebabkan kenaikan harga perkhidmatan logistik kerana jumlah muatan yang dibenarkan semakin berkurang. Akhirnya kesan ini akan menjangkau kepada harga barangan dan perkhidmatan secara keseluruhan dan rakyat biasa akan turut menanggung kos tersebut. Oleh itu, pelaksanaan peraturan ini perlu dilakukan secara terancang, berperingkat dan tidak menggugat kestabilan mana-mana pihak. Dato’ Chairman, sekali lagi saya ucapkan terima kasih atas peluang yang diberikan untuk menyuarakan pandangan dan keperluan rakyat Klang dalam perbahasan ini. Saya amat berharap agar segala cadangan yang telah dibangkitkan, khususnya berkaitan pembangunan dan penyelenggaraan sistem pengangkutan awam serta infrastruktur sokongan di Klang dapat diberi perhatian sewajarnya oleh pihak kementerian. Klang adalah nadi logistik dan perdagangan negara dan dengan perancangan serta pelaburan yang tepat, kita mampu menjadikan daerah ini sebagai model sistem

pengangkutan moden yang menyumbang secara langsung kepada pertumbuhan ekonomi negara secara menyeluruh. Terima kasih, Dato’.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Klang. I now invite the Honourable Member for Jerantut.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. Thank you to Dato' Dr. Mr Chairman for giving me the opportunity to debate matters relating to the Ministry of Transport (MOT) at the Committee Stage. Mr Chairman, the budget allocated to the Ministry of Transport is approximately RM6.8 billion. So, my question in general, basically, is what— how much expenditure has been allocated for the 2026 financial year for implementing the recommendations raised by the special team regarding the fatal accident involving FRU personnel and also our UPSI students, and in detail, what are those items?

Secondly, Mr Chairman, Item 12100 concerning New Office/Building, Equipment and Computerisation of the Road Transport Department (JPJ). An increase of more than 56.6 per cent for 2025, that is from RM73.3 billion to RM169 billion for 2026. So, the ministry is requested to explain in detail all the projects under this allocation, because I have observed that many of the actual expenditures under this item are always far below what was estimated. And Jerantut proposes that the ministry may allocate a small portion of this budget to establish a JPJ Jerantut Branch Office, or at least set up a JPJ service counter in Jerantut, or set up several JPJ kiosks in Jerantut to facilitate the public's access in Jerantut, which is among the largest districts in Peninsular Malaysia. Also in relation to JPJ, Mr Chairman, namely Item 10000 – Emoluments, 020300 – Road Transport, and 040200 – New Modernisation Policy

JPJ Enforcement. The question from Jerantut is: with the addition of emoluments and the improvement of JPJ management, is there any plan at the ministry level to improve the roadblock system carried out by JPJ? We do not reject that roadblocks are important to ensure enforcement. However, if we look at developed countries, roadblocks are set up according to the number of lanes available: if there are four lanes, then four lanes; if there are three lanes, then three lanes. But this does not happen in Malaysia; it becomes one lane, causing extraordinary congestion. And there has previously been a reply from the ministry stating that we have too few enforcement officers. If there are too few enforcement officers, we must strategise so that enforcement officers are available, because we do not want to punish those who abide by the law. We want to carry out enforcement against those who do not follow the law, but we are inconveniencing those who follow the law; that is the first point. The second point, Mr Chairman, is that it has now become JPJ's trend to set up roadblocks in the middle of highways. In the middle of highways. If that is supposedly effective for carrying out enforcement, how about the feelings of users who pay tolls on the highway? And these users, Mr Chairman, are usually people who use the highway and have not made any mistakes. Because on highways they cannot escape, it is straightforward only. On village roads, non-highway roads, we can use rat runs, usually like that. So, why do we do something that causes extraordinary congestion? This is not because of an accident or because of— extraordinary seasons such as the festive holiday season and so on. This is done in the middle of highways; it should not happen. And then it is also now the trend to carry out these operations in city centres on weekend nights, causing extraordinary congestion, which causes domestic tourists who travel to the states or cities concerned to no longer wish to repeat their trips to that city because of the congestion they experience. This causes a reduction in income to local people in particular. Next, Item 020300, Mr Chairman, concerning the treatment of Malaysian vehicles by the Singapore authorities. I have received many complaints regarding the harsh actions by the Singapore authorities against vehicles

Malaysia. There are vehicles that take family members or friends to Changi Airport that have even been detained, recorded by Singapore PHV drivers, and there are even cases of vehicles being seized on allegations of illegal transport services. Since July, it has been reported that more than 126 Malaysian vehicles have been seized, including on grounds such as no insurance even though the owners and holders hold valid cover for overseas travel. At the same time, Singapore PHV vehicles such as Grab, Gojek and others are free to enter Malaysia to pick up passengers, drop off customers throughout the country and carry out commercial operations here. This situation raises major questions. So, my question to the MOT is, does the MOT assess this issue as a significant imbalance in the implementation of cross-border policy, and what is the MOT's position on the seizure and heavy penalties imposed on Malaysian vehicles compared with vehicles from their side entering our country? Mr Chairman, two more issues, briefly, concerning first the— the Item 00400 – PPP/PFI concerning KSP. The Kedah State Government has now complied with six of the eight recommendations of the National Physical Planning Council (MPFN), and all seven technical study reports have received full approval without any obstruction from the relevant technical agencies. I wish to record— Jerantut wishes to record its highest appreciation to the Right Honourable Prime Minister, Dato' Seri Anwar bin Ibrahim, for the approval of an additional five-year extension to enable the state government to continue the work of complying with the remaining MPFN recommendations and to begin early development of the industrial component or business park and the Sidam Logistics, Aerospace & Manufacturing (SLAM) Hub. I would like to request an explanation from the government on the status of allocation for the development of the Sidam Logistics, Aerospace & Manufacturing (SLAM) Hub, which was not included in Rolling Plan 1. I request that the project details be re-included in Rolling Plan 2, and whether the government also plans to assist the state government in providing allocation for infrastructure development in the industrial component and business park that has been approved to also be developed first. And finally, Mr Chairman, Item 30000 – Air Transport Projects. A question to the ministry concerning the international airports within our country. Is there enforcement at the ministry level

to install scanning machines for bags brought in by domestic and foreign tourists at the airports to ensure the security of goods brought in, so that there are no drugs, illicit money and so on? Secondly, what action is the ministry, or the extraordinary action of the ministry as regulator of MAHB, taking to prevent the 'waterfall jadian' incident that recently occurred at KL Terminal 1, which has embarrassed the nation? That is all, Mr Chairman, thank you. Assalamualaikum.

Mr Chairman (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Waalaikumussalam, thank you, Honourable Member. Please proceed, the Honourable Member for Miri.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you, Mr Chairman, for the opportunity given. I refer to Head P.28, Item 13000 – Construction and Upgrading of Airport Infrastructure. First, I wish to record my highest appreciation to the government for the approval of RM2.3 billion for airport development in our country, including at Miri Airport. This is good news for the people of Miri because once this project is completed, it will not only bring comfort but also be able to attract more aircraft to come to Miri. And this will indirectly stimulate the economy in the Miri area. My question is about the details of the scope and work components for upgrading Miri Airport, as well as the implementation period of the project based on the planned scope and work components. Next, I wish to refer to Item 0 — sorry, Head B.28, Item 030700 – Rural Air Service Subsidy. Thank you to the government for continuing to provide subsidies to rural air services, which enable air ticket prices to rural areas to remain affordable even though they are not profitable. I request that the government explain how this subsidy scheme is implemented in determining air ticket prices from rural areas? I would also like to propose that the government emulate certain countries in introducing service subsidies for retired police and military personnel. This would be a method of showing appreciation for the service of

Tuan Chiew Choon ManPKR · PHMiriEN

they rendered to the nation, for example KTM Berhad could offer travel fare discounts for ETS and Intercity services to retired ATM veterans and their wives. I request that the government consider whether subsidies and discounts can be given to ATM veterans and also former— retired police personnel. And countries with archipelagic regions, such as Jeju in South Korea, have also introduced discounts for residents of that region. If we are unable to do this for everyone, perhaps I suggest we could also give air ticket discounts to senior citizens from Sabah and Sarawak who wish to go to or return from the Peninsula.

Tuan Chiew Choon ManPKR · PHMiriEN

Next, I refer to Item 031100 – Flight Ticket Subsidy (Flysiswa and Festive Season). Thank you also to the government for its concern for students from Sabah and Sarawak who pursue their studies at public higher education institutions (IPTA) in Peninsular Malaysia, and also for those in the reverse situation. This can ease the burden on students at IPTA. However, I also humbly request that the government continue to expand this programme to students at private higher education institutions (IPTS) so that they too can receive this benefit. Regarding the festive season subsidy. This is also a very good initiative to ease the burden on our people in returning to their hometowns. However, I request that the government announce this programme earlier or make this programme an annual programme, so that it can help with earlier planning. For example, many people are now wondering whether this programme will be continued next year, and they are also in a dilemma because air ticket prices during the festive season are increasing, but they have no certainty as to whether this programme will be extended into next year. [Mr Speaker presides over the Committee] Lastly, I refer to Item 010300 – Air Management. I wish to touch on the issue of flight delays, with permission, involving AirAsia. At the briefing last August, we were given to understand that around the end of October more aircraft would be made available and this would reduce the problem of schedule delays.

Tuan Chiew Choon ManPKR · PHMiriEN

However, up to now, schedule delays still occur frequently, especially for night flight schedules. Therefore, I request that the ministry cooperate with AirAsia to facilitate or expedite all necessary processes to overcome the flight delay problem, with permission, which still occurs frequently. That is all, thank you.

Mr ChairmanEN

Okay, next I invite Merbok.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Okay, thank you Tan Sri Chairman. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. Tan Sri Chairman, I go straight to Head P.28, 020100 – Land Public Transport Agency (APAD). Merbok wishes to know whether the ministry proposes to restructure APAD, including the measures taken to improve governance, efficiency of permit operations, and reduction of bureaucracy that burdens operators and the industry, and whether the government has clear KPIs to rectify delays in the issuance of licences and permits? What measures have been taken by the ministry to improve transparency of the decision-making process in APAD, including publishing processing timelines, transparency criteria and reasons for rejecting applications, to ensure fairness to all applicants? Merbok proposes that the ministry fully digitalise APAD services and reduce dependence on manual processes that often cause delays and room for manipulation, and proposes that an impact effectiveness assessment, with permission, be carried out on APAD policies. Including restructuring of bus routes, permit requirements, and fare setting that are more efficient. I would like to touch briefly on e-hailing operators. Previously, there was an issue of unfairness regarding complaints about booking distribution systems that were biased, including discrimination based on language. Merbok wishes to know whether this matter has been addressed by APAD and ensure that all operators

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

of these e-hailing services are obliged to ensure their systems are fair and equitable to all drivers registered in their systems. And if there is a breach of conditions, APAD licensing may take action against these e-hailing operators under the Land Public Transport Act 2010, namely Act 175. Merbok suggests that APAD must not compromise in ensuring fairness and transparency in the e-hailing industry so as to provide justice to these e-hailing drivers. Next item, 020300 – Road Transport. Allocated a sum of RM700 million. There is a slight decrease from the— not from this year. Nowadays we often see the true attitudes of drivers on the road through social media, recorded using dashcams installed in vehicles. Various types of offences, misconduct and driver behaviour, including fights that we often see, such as no more tolerance, patience and competence in handling emotions and vehicles on shared roads. Merbok wishes to know whether there are efforts by the ministry in administering the driver training, testing and licensing system to overhaul or improve the driving school system and curriculum so that it is more comprehensive and emphasises training in good ethics, so that the ministry can train new or existing drivers who are found to have violated regulations to be more patient and considerate when they are on the road. Next, 020700 – Civil Aviation Authority of Malaysia (CAAM). Merbok wishes to know why there is no expenditure allocation to CAAM for next year. Next, Head P.28, Item 00900 – Enhancing KTMB's Capacity. Merbok wishes to know whether this allocation also includes expediting the Road to Rail initiative, which can reduce congestion and road accidents. And finally Merbok wishes to ask...

Tuan Zakri bin HassanBERSATU · PNKangarEN

Merbok, I interject, Merbok. May I?

Ya, sila.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Okay, regarding this ETS, the ETS ticket is quite expensive, sometimes almost the same as the price of low-cost air tickets, but it receives very high demand. Does Merbok agree that the regulation of this ticket price needs to be carried out by the ministry so that people from various groups can take this ETS? Thank you.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Thank you. Yes, Kangar, I agree with Kangar's view that ETS services need to be increased in frequency or have new coaches added because of very high demand. Because I myself use the ETS every week to go back and forth to my area. And finally, Merbok wishes to ask whether the ministry, in providing comfort and added value to KTMB's customers, will provide fast free WiFi to its customers, especially on long-distance services such as the ETS that Kangar mentioned earlier. Why? We have devices on the ETS, especially in business class. They are available, but we cannot watch videos because when the train passes through forest areas and so on, we have no access to the internet. Could we install something like Starlink so that we get free WiFi and can provide it to all passengers? Because long-distance travellers may be bored on the old train. So, I ask KTMB to look into this matter. So, I think that is all for now, Chairman. That is all, thank you.

Mr ChairmanEN

Okay, I invite Tampin.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera, salam Malaysia MADANI. Thank you Tan Sri Chairman for granting me permission to take part in the debate on the Supply Bill 2026 at the Committee Stage for the Ministry of Transport. First, I, Tampin and my colleagues welcome the presence of students from Universiti Teknologi Malaysia (UTM) to the Dewan Rakyat. Tampin is a former civil engineering student of UTM. [Applause]

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Oh, have you eaten Gardenia bread?

Tan Sri Speaker— Tan Sri Chairman, allow me to begin the debate by touching on Item 020600 – Malaysian Institute of Road Safety Research (MIROS) with an allocation amounting to RM17 million for 2026. Almost every week our country is shocked by reports of accidents involving lorries, trailers and buses. The accidents that occur not only claim the lives of the drivers of those vehicles but also involve innocent road users. Accident after accident has caused the public to see this situation as no longer merely a coincidence, but a failure that requires comprehensive action from the ministry. First, there are consistent complaints that heavy vehicles operating on highways and Federal Roads do not undergo regular maintenance. Faulty brakes, worn tyres and overloading. There are also reports that some heavy vehicle drivers are pressured with tight delivery schedules and are forced to drive while fatigued. Drivers who do not get enough rest are moving time bombs on the road. Thirdly, it is none other than failing to comply with permitted speed limits. Let me take as an example when heavy vehicles break down on the road but do not place an "awas" sign or a "vehicle broken down" sign.

As a result, road users who crash into the rear of such vehicles. This makes it difficult for other drivers who have to face such disastrous accidents. My question is, how many summonses have been issued by JPJ to owners and operators of heavy vehicles that failed to undergo periodic inspections over these past five years? How many individuals have been sentenced to imprisonment, and what efforts has the ministry made to address the issue of heavy vehicle drivers who are bound by unrealistic delivery schedules? My last question on this issue: when will the ministry make new speed limit regulations for heavy vehicles to further strengthen

safety aspects and ensure more controlled driving on highways and main roads throughout the country? Next, Tan Sri Chairman, I would like to turn to Item 050600 – Motorcycle Driving Safety Programme, with an allocation totalling RM2 million for 2026. First, I would like to thank the government and the ministry for continuing to bear the cost of obtaining Class B2 motorcycle licences to support less well-off youths involved in delivery services. In this day and age, a driving licence is no longer an option. A driving licence is a necessity for work, for managing daily tasks and for supporting families. However, is the ministry aware of the complaints of the people out there regarding the prices of motorcycle and car licences, which are far too high and burdensome? This situation causes many people to postpone obtaining their licences or, even worse, to drive without a licence, thereby increasing road safety risks. According to the Malaysian Vehicle Theft and Accident Reduction Council, there are around nine million motorcyclists in this country who were found not to have, or to have failed to renew, a valid driving licence after its expiry. This figure is very worrying. My question to the ministry: what are the main factors causing the cost of obtaining a driving licence to keep rising every year? Is it because of training fees, the cost of JPJ driving tests, or something else? And does the ministry have a projection of the actual cost of obtaining a B2 licence and a D licence at the national level? This matter needs to be explained so that there is transparency and the people know the actual cost components. On this occasion, I urge the ministry to take immediate action by lowering the cost of obtaining motorcycle and car licences so that they are more realistic and affordable for the people. Next, Tan Sri Chairman, I would like to turn to the last item, namely Item 020300 – Road Transport, with an allocation totalling RM702 million for 2026. In June 2025, the Ministry of Works was reported to have submitted a proposal to the Ministry of Transport and the Ministry of Finance to raise taxes on heavy vehicles as one of the methods to cover the burden of road repairs, which are increasingly critical, and are estimated to reach RM4 billion a year.

Heavy vehicles exert greater pressure on roads. Therefore, it is fair to impose taxes that reflect the actual impact on infrastructure. In addition, this proposal will also improve load compliance and the safety of road users. Accordingly, I would like to know, what is the response or stand of the ministry towards the proposal to increase taxes on heavy vehicles? The proposal to raise taxes on heavy vehicles is not an attack on the logistics industry, but a basic principle that whoever damages or wears down the roads should help bear the cost of restoration. This is the concept of shared responsibility and social justice. If implemented carefully, we will not only be able to repair damaged roads, but also encourage a more responsible and sustainable transport culture. Therefore, I urge the ministry to consider this proposal seriously and to promptly begin negotiations with the stakeholders. The impact of overloading on roads is a reality and contributes to a heavy financial burden on the nation and the risk to road users' safety. Tan Sri Chairman, that is all from me for now. A brand-new-faced Proton Saga, Do not drive while distracted; Always obey the speed limit carefully, May you be safe on the road. I seek support. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Good, thank you. Next, I invite Bukit Gantang.

In the name of God, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Tan Sri Chairman, Item 020100 – Land Public Transport Agency and Item 60000 – Urban Public Transport allocation. Tan Sri Chairman, the allocation provided is large. Nearly RM3 billion. Does this involve other cities or only Kuala Lumpur? Efforts to improve urban mobility through MRT, LRT, electric buses and BRT must be able to

resolve the integration mode, with permission. We cannot just add more rails without thinking about more suitable and efficient integration. Today, the people still face the problem of uncomfortable mode transfers and long walking distances that are unsuited to the country's unpredictable weather of rain and heat. Therefore, here, city taxi services are the best and most relevant service at all times for door-to-door service, with permission. The government must continue city taxi services as in major cities all over the world. London with its black cab, Indonesia with the blue cab, Singapore with Comfort, Bangkok with Bangkok Taxi and New York, NYC yellow. But in Malaysia, the identity of city taxis has changed since its Minister has already started changing. I have been informed by drivers and taxi operators that the government will now bring in blue cabs from Jakarta and Comfort taxis from Singapore into this country. I hope this information is not true. Are we not capable of managing taxis that have been established here for years? The MOT must give attention and fairness to existing taxi drivers and taxi operators. First, the addition of permits to make the industry more relevant. Second, the red-and-white taxi identity should be maintained. Do not mix it with other colours. Subsidies should be given fairly to e-hailing and city taxis. The standardisation and digitalisation of meters must be implemented with e-hailing and aim to align fares between city taxis and e-hailing, where e-hailing is not controlled in fares by the MOT. The e-hailing company that is monopolising is Grab, which gets a large space with an unlimited number of permits. After the entry of e-hailing and after COVID, out of 60 taxi companies, only 30 are still operating now. Even those are struggling to survive until they close. Out of those 30 taxis, only two Bumiputera taxis still exist at present. I propose that an agency be appointed as the patron, catalyst and coordinator to integrate and digitalise all urban transport industry players, especially in Kuala Lumpur, and the most suitable agency is Khazanah Nasional Berhad because Khazanah is developing the Greater KL project and increasing tourist locations.

Next, Item 00800 – Project to Rehabilitate and Strengthen the East Coast Railway Line. Allocation of RM183 million. The East Coast Rail Link project, whose route connects the Klang Valley, Negeri Sembilan, Pahang, Terengganu and Kelantan over 665 kilometres, is expected to begin operations in January 2027 at a speed of 160 kilometres per hour. Is the government able to complete this RM183 million project in 2026? The question is, how many phases will the government carry out and how many companies are involved in this project? Item 00900 – Enhancing KTMB's Capacity. With an allocation of RM1 billion — RM1.0945 billion, what is the breakdown of expenditure between the selection of new rolling stock and new stations? How many local companies and foreign companies are involved in this project? Will the government consider making car trains like those made by developed countries? This allocation shows the government's commitment to upgrading public trains. We know people see large expenditure, but the companies appointed still cannot deliver efficient services. For example, the KLIA aerotrain is very embarrassing. How long has it still not been completed. Finally, I would like to know which companies are involved in the manufacture of trains, how many units and who— what is being made a future industry for train manufacturing in Malaysia? That is all, thank you. I seek support.

Mr ChairmanEN

Good, I invite Bakri.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Tan Sri Chairman.

Tuan Tan Hong PinDAP · PHBakriEN

Item 010500 – Strategic and International Planning. Tan Sri Chairman, in the Thirteenth Malaysia Plan, the government has set a target to separate the functions and responsibilities between RAC and KTMB from the current 20 per cent to 90 per cent by 2030, with the aim of introducing a multi-operator system and imposing a track charge. Tan Sri Chairman, in principle I support it and I give— given that this policy is a good policy. However, based on experiences abroad, the policy of vertical separation, or with permission

Tuan Tan Hong PinDAP · PHBakriEN

vertical separation, has given many failed experiences, and some have even weakened the overall capacity of the national rail system. Mr Chairman, the original rationale for the establishment of RAC in 1992 was to transfer the infrastructure debt burden from KTMB so that the operating company could function more efficiently and commercially. But after 30 years, the reality is that KTMB still depends on government subsidies and grants, while RAC remains the holder of assets without a stable revenue stream. Therefore, the big question here is, do we really want to add yet another layer of bureaucracy when the real problem is not who owns the assets but the real problems concerning governance, funding models and operational productivity? Tan Sri Chairman, there is also much experience in other countries. First, in the United Kingdom. Through Railtrack, after the separation and privatisation of infrastructure, it experienced a series of major accidents and eventually went bankrupt in 2001. Second, New Zealand. After full liberalisation, its infrastructure was neglected until it was eventually taken back over by the government. Third, in Eastern Europe. After liberalisation, rail workers' wages fell sharply and operational safety was affected due to too many sub-tier contractors. Tan Sri Chairman, trade unions in Germany and the Czech Republic also strongly opposed this separation policy because it fragmented collective bargaining structures and lowered the dignity of work in the public rail sector. The fact is that the liberalisation of public rail based on market operating principles has never provided evidence and assurance that there is any improvement in infrastructure quality, operational efficiency or ticket prices. On the contrary, what is often observed is fragmentation, overlapping functions, and in the end the people as users become victims of inconsistent services. Therefore, I would like to obtain an explanation from the government: what is the real direction regarding the policy of separating functions between RAC and KTMB? Does the government plan to review the implementation of this policy or consider reintegration measures between RAC and KTMB so that governance, efficiency and operational safety of the railways can be strengthened?

Tuan Tan Hong PinDAP · PHBakriEN

Tan Sri Chairman, today the new challenge faced is the increasing dependence on external maintenance services or outsourcing within KTMB. Much maintenance work and technical repairs, whether rolling stock maintenance, electrification system or signalling, are handed over to external contractors, including foreign vendors such as Reltech and SMH Rail. As a result, KTMB itself is increasingly losing its technical capacity to manage its system comprehensively. In the long term, this not only increases maintenance costs, but has also made us overly dependent on third parties. Whereas, if we look at international examples such as Deutsche Bahn from Germany and SNCF from France, both maintain strong in-house technical units to train engineers, transfer technology and develop long-term maintenance capacity. I would like to ask the government, what steps will be taken to reduce dependence on outsourcing and to re-strengthen KTMB's internal technical capacity so that we can manage our national rail services with the real ability to maintain its assets competitively? Tan Sri Chairman, I was interested in the statement by the Honourable Minister regarding the Road to Rail initiative, which is a strategy to move a large part of freight transport from road to rail. This approach not only can reduce road congestion and carbon emissions, but also improve road safety as well as the punctuality and reliability of the national logistics system. However, the question is, what is the government's concrete plan to ensure that Road to Rail actually happens and is not merely a slogan? At present, the volume of cargo transported by rail is around five to six million tonnes a year, far lower than the actual potential and well below the government's target, which is for rail freight to double by 2030. In fact, the main— the main problem is very clear, the very limited capacity of locomotives and rolling stock. The number of active locomotives at present is estimated to be fewer than 30 units operating consistently, while most freight wagons are more than 25 years old. If the government is serious about the Road to Rail proposal, it must start with additional investment, namely:

Tuan Tan Hong PinDAP · PHBakriEN

(i) adding more modern diesel-electric locomotives; (ii) modernising cargo wagons according to type of cargo such as containers, petroleum and industrial raw materials; and (iii) improving the efficiency of rail terminals such as Padang Besar, Port Klang, Kempas Baru and Segamat so that loading and unloading can be carried out more quickly.

Mr Chairman

Masa YB.

Tuan Tan Hong PinDAP · PHBakriEN

Fourth, creating integration with ports and major industrial zones so that rail truly becomes the backbone of logistics, not merely a supplement as it is now. For example, Thailand and Vietnam are now implementing a shift-to-rail model strategy by providing tax incentives and lower tariffs to logistics companies that use rail, something we can consider in the context of Malaysia. Therefore, Tan Sri Chairman, I hope the government's proposal to move most of our traffic, most of our flows, from road to rail is a consistent and serious policy so that we can solve, or at least reduce, the traffic congestion occurring on roads now. I do not want what happens now every weekend on the PLUS Highway or the North-South Expressway to become extremely congested for no reason.

Tuan Tan Hong PinDAP · PHBakriEN

Therefore, I hope the government gives the proper emphasis to developing rail transport, especially for new routes that currently have no rail transport.

Mr Chairman

Baik.

Tuan Tan Hong PinDAP · PHBakriEN

That is all the proposals from Bakri. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Good. Thank you. I invite Setiu.

Peace be upon you and the mercy and blessings of God. Mr Chairman, I move to Item 020100 – Land Public Transport Agency (APAD). There is an increase for the 2026 Budget, namely RM4.043 million. With reference to this item, it concerns bus services in the district of Setiu.

Last September, the Honourable Minister launched the Stop-and-Go Bus Service Transformation Programme (BAS.MY), which is a new bus service to Merang that is greatly welcomed by the people of Setiu. However, I would like to request that the service on this bus route be extended to Kampung Mangkuk. Given that Kampung Mangkuk has been declared a state tourism village of Terengganu and is now a major focus for tourists. This step will further facilitate tourist access. In addition, this service is also important for students who commute to SMK Penarik, following the reliance on school bus companies by JPJ which has caused many students difficulty in getting to school. This route is also important to be extended for bus services because there is a clinic under construction, namely Klinik Rhu 10, which is nearly complete, and Rhu 10 is also a main destination for lovers of batter-fried prawns (UCT). Mr Chairman, next, for the same reason, namely the delay and unsatisfactory quality of repairs by the contractor CCCC, China Communications Construction Company, regarding road and infrastructure damage in Setiu caused by the construction of the East Coast Rail Link (ECRL) project. Residents face potholed, uneven and narrow roads due to erosion and dust, although some have been repaired, the repairs are only temporary and do not last. I often receive complaints from residents because it has dragged on for a long time despite various complaints having been made repeatedly. Among the affected locations are: (i) the Federal Road at Kampung Sungai Bari, damaged by heavy machinery traffic; (ii) the state road from Kampung Bukit Nenas to Corner Pink, including the area in front of the Bukit Nenas Palm Oil Mill, still uneven and not level even though it has been resurfaced many times; (iii) the back road of National Secondary School Tengku Ibrahim Bandar Permaisuri, used by stone haulers, causing damage, and road damage caused by the construction of the ECRL railway; and

(iv) drains blocked by earthworks that obstruct the flow of water and increase the risk of flooding at Kampung Bintang, Kampung Kuala Kubang and other areas in Pasir Tawar. I do not blame the MRA in this issue. I have been informed that various complaints, reprimands and reports have been forwarded by the MRA to CCCC. However, the real problem lies with CCCC, which takes a careless attitude. Sometimes it is slow, and it often carries out half-finished repairs. Residents have to travel on unsafe roads every day, and some repair works that were done have even broken down again within a short time because they were not carried out thoroughly. The ECRL project in Terengganu is now nearly complete, at 93.55 per cent as of September 2025, and is expected to begin operations in early January 2027. In Setiu, there is great concern as the ECRL construction works are approaching the final phase. They may leave existing damage unrepaired properly. We do not want, after the project is completed, for residents to have to bear the long-term effects. Accordingly, I request that the ministry direct all the parties involved to carry out a comprehensive review of all roads, drains, infrastructure and public facilities affected by this project. Item 010300 – Air. Next, under this item, the first issue is that there is a need to upgrade basic facilities at the airport, particularly the number of waiting seats and toilet facilities. The seating provided at the departure hall and arrival hall is still insufficient, especially during peak seasons. This has a major impact on senior citizens, families with young children, persons with disabilities (OKU) and tourists who have just arrived after a long journey. In addition, the toilet design at KLIA still does not meet the needs of Muslim users who require appropriate istinjak facilities, and of senior citizens, especially those visiting KLIA for the first time. A toilet design that places the water pipe inside the toilet bowl makes use very difficult. I ask for the ministry's attention in this matter. Finally, Mr Chairman, under the same item, is the issue of leaks at KLIA, which have gone viral several times and been reported by the media. We all know that KLIA is the country's main gateway, and every time a leak occurs in the arrival hall or commercial areas, it directly gives the impression of weakness in

national maintenance, with asset management and maintenance allocations that were increased in 2006. I would like an explanation. Has the ministry set a specific action plan to resolve this leakage issue comprehensively, including structural audits of the building, roof drainage systems and periodic maintenance? And more importantly, will the ministry introduce a new accountability mechanism so that negligent operators or contractors are subject to firm action, not just temporary repairs that end up recurring? That is all. Thank you.

Mr ChairmanEN

Good. Next, I invite Petaling Jaya.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Thank you, Tan Sri Chairman. For Item 020300 – Road Transport. I want to voice the concerns of lorry drivers who, as we know, are facing the crackdown on overloaded commercial vehicles through the Integrated Enforcement Operation, which has already begun and runs until 31 December. It was reported by the Malaysian builders' association that some 6,000 concrete mixer trucks are needed, and this will increase construction costs and the prices of houses and buildings, as the weight limits are now being strictly enforced. The increase in logistics costs will also raise business costs and the inflation rate, and cause traffic congestion. May I know what the ministry's views and steps are for a soft landing that can be implemented so that the impact is more easily accepted by the industry and the people? In addition, Tan Sri Chairman, I have been informed that the ministry will also draft legislation to allow action to be taken not only against drivers and transport companies but also against senders and receivers of goods involved in the activity of lorries carrying excessive loads. May I know, and when will the Bill be tabled in this honourable House? Next, Item 020600 – Malaysian Road Safety Research Institute. Furthermore, we are aware that 6,000 deaths are recorded from road accidents each year, or 16 deaths every day. Based on this data, 70 per cent of fatal accidents involve motorcycle riders.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

Tan Sri Chairman, may I know why no exclusive motorcycle lanes have been built, or are not planned to be built, for riders as practised in other countries? In addition, can motorcyclists be prohibited from using highways that do not have a buffer zone for these riders, to the point of endangering their lives? And then, under Item 020100 – APAD. Tan Sri Chairman, regarding public transport planning. I am informed that every planning permission (KM) approval is made without input from APAD. This often results in the construction of so-called ghost bus stops, because the bus stops end up without any bus service. There is also population growth without accompanying bus services, and planning that does not take into account the need for public transport use.

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

May I know whether the government will require APAD officers to sit in on meetings approving a project, and that all traffic impact assessments must first obtain APAD approval. I would also like to move on, Tan Sri Chairman, to Item 00800 – Project to Rehabilitate and Strengthen the East Coast Railway Line. I raise this not because I am from Petaling Jaya, but because my mother is a Kelate person, from Kelantan. After the major floods some years ago, the KTM train service from Kelantan to Kuala Lumpur was halted for years, at least more than five years without restoration. This situation has greatly affected many rural students studying in Kuala Lumpur from the state. Now, those who want to go to KL must buy airline tickets or take the bus. If the train service to Kuala Lumpur can be restored, at least they would have another option that is more economical, safe and stable. This is not a minor issue. For many families, it involves a very real financial burden. Some may say, Tan Sri Chairman, "Wait for ECRL. ECRL is almost complete. So there is no need to restore the train any more." However, this reasoning is actually unreasonable because, before ECRL is fully operational, demand

Tuan Lee Chean ChungPKR · PHPetaling JayaEN

during this gap period still exists. We cannot let students, workers, senior citizens and even passengers who want to return to their hometowns continue to suffer this hardship. The current situation is that passengers from Wakaf Bharu or Tumpat have to take the train south as far as Gemas first, before they can change trains to Kuala Lumpur. It is very troublesome and a waste of time. In the past, trains from Kelantan could go directly to KL and also directly to JB. Now, only JB still has a direct route; to KL, one must change trains. My question is, what is the current status of the repair of the railway line from Kelantan to Kuala Lumpur? That is all for my debate. Thank you.

Mr ChairmanEN

Good. Next, I invite Padang Rengas.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you, Tan Sri Chairman. Under Item P.28 09000 – Railway Services. I would like to touch on two important matters that have a direct impact on the people of Padang Rengas and the northern region of Perak. First, I request that the ministry increase the frequency of ETS trains northbound and make Padang Rengas KTM station a permanent stop. Many residents, students and workers have to go to Kuala Kangsar or Taiping solely to catch a train, even though Padang Rengas Station has complete facilities and high potential for users. Adding one or two daily stops will not affect ETS operations and will in fact have a major impact on the mobility of rural people. Second, I urge the government to resume the commuter service from Ipoh to Kuala Lumpur. This resumption is eagerly awaited by the people of central Perak and Kuala Kangsar, because it can reduce congestion on the PLUS highway, save daily costs and reduce carbon emissions. It is also in line with the aspiration for green transport and the economic goals of the people under Budget 2026. Tan Sri Chairman, under Item B.28 020300 – Enforcement and Road Safety. I would like to draw attention to the issue of heavy lorries owned by industrial companies such as YTL Cement and cargo lorries that frequently park carelessly

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

in the Padang Rengas area, particularly in front of petrol stations, along the main road and in front of housing estates. This situation not only obstructs the view of vehicles entering and leaving, but also poses a high risk of accidents to road users, including students, motorcyclists and local residents. I request that the Ministry of Transport (MOT), together with the Road Transport Department (JPJ) and the local authorities (PBT), take firm action, including increased patrols and integrated enforcement, and assess the need to build special parking zones in the industrial areas around Padang Rengas. At the same time, large companies such as YTL Cement need to demonstrate corporate social responsibility (CSR) by providing their own safe lorry parking areas that do not compromise public safety. I also suggest that the government set up a special task force on heavy lorry parking under MOT to coordinate joint action with JPJ, the Royal Malaysia Police (PDRM) and PBT, especially in high-risk industrial areas. The safety of the people cannot be compromised on the grounds of industrial operations. Tan Sri Chairman, I would also like to touch on two matters under Items B.28 010200 and 020200 relating to the national shipping and maritime industry. First, Malaysia, as a maritime nation, must be prepared to face global changes as the international shipping industry is now shifting to renewable fuel to achieve net zero carbon targets. Neighbouring countries such as Singapore and Japan have started implementing energy migration for their ships. The question is, what are the details of Budget 2026 to help local shipping companies make this energy transition? This step requires large investment for upgrading ship engines, research and development, and green port development. Without government support, local ship owners risk falling behind and losing regional competitiveness. Second, I would like to touch on the implementation of the Malaysia Yacht Code (MYC) under the Marine Department, which places the Langkawi International Yacht Registry (LIYR) on a par with international yacht registration. The value of this industry now exceeds RM100 billion, but this potential has not yet been translated into local revenue generation. I request that the government examine whether Budget 2026 provides incentives or special grants to encourage the participation of local companies in the shipbuilding,

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

maintenance and marina development sectors. The maritime industry is not only the lifeblood of trade but also a symbol of the nation's technological capability. Therefore, I hope Budget 2026 will focus on the green energy transition and the strengthening of the local maritime ecosystem. That is all. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Good. Next, I invite Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Assalamualaikum, peace be upon you, and greetings of Malaysia MADANI. Tan Sri Chairman, I thank you for the opportunity to debate the allocation of the Supply Bill 2026, particularly for the Ministry of Transport. I wish to focus my debate on three main issues that are directly related to the needs of the people, infrastructure and transport safety. First, Item 60000 – Urban Public Development amounting to RM2.792 billion. I want to raise the matter that the people of the Klang Valley have long been waiting for, namely the LRT3 project connecting Bandar Utama and Johan Setia. The people are very eager for the opening and operation of LRT3, especially after its date was revised and postponed several times. According to the Minister of Transport recently, the opening of LRT3 was planned for 30 September after full handover of the project, which was expected to take place on 31 July 2025. However, there were reports of delays due to the 24-hour train testing process and the fault-free run that was still ongoing. Nevertheless, a new date was announced at the end of October. But October has also passed, and the date we are now waiting for is December 2025.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

My question is whether the opening of LRT3 will be realised once all safety and reliability tests have been fully carried out. I request a transparent explanation from the Ministry of Transport on the current status, and a clear statement of the estimated opening date, taking into account any further delays that may occur. Apart from that, I have also received many enquiries from the people of Shah Alam regarding the feeder system for the first mile and also

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

the last mile passing through residential and commercial areas, to help people make early plans once the LRT is opened. I refer to the local authorities, which I believe are the agencies directly involved in mapping out these routes. However, the feedback I received is that this is still not finalised with the Ministry of Transport. So, I am somewhat puzzled that LRT3 will be opened in the not-too-distant future, yet our readiness to connect this system with people's homes has not yet been finalised. I seek an explanation from the ministry regarding this matter. Second, Tan Sri Chairman, in relation to Item 40000 – Upgrading and Development of Traffic Control/Management Systems with a development allocation of RM110 million. This issue is worrying because accidents frequently involve heavy vehicles at the Alam Budiman junction, Persiaran Mokhtar Dahari, where residents often complain that heavy lorries carrying heavy loads use a shortcut through Taman Alam Budiman, increasing the risk of accidents. Moreover, this road is always busy due to the growth of residential areas and the rapid development in the vicinity of Shah Alam. I have received many complaints from the public. Although there is no accurate report from any agency, whenever accidents occur, I often receive complaints or photographic reports from residents showing that heavy vehicles are among the causes of accidents there, either because they are driving too fast or because materials such as sand and stones fall onto the road and make it dangerous, especially for motorcyclists. Therefore, I want to ask how successful the crackdown on overloaded commercial vehicles announced recently by the Honourable Minister has been. Does the ministry also take into account Persiaran Mokhtar Dahari as one of the areas that is a focus of the efforts being undertaken? Lastly, Tan Sri Chairman, it concerns Item 00200 – Strategic Transport Study with a development allocation of RM11.4 million. We

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

are aware that the number of private vehicles continues to increase from year to year. According to the Institute of Planners, it reported that about 47.3 per cent of the total registered vehicles are private vehicles. This shows how dependent our country is on cars or private vehicles. Although the government constantly improves public transport facilities, such as the LRT, ECRL, BTS and the like, the use of private vehicles also involves user behaviour. So, this issue raises the question of whether the government is considering implementing a rationing system to enter city centres or certain routes that are already very congested, as in models used by other cities in neighbouring countries such as Manila, where they restrict car movements based on the last digit of the number plate on certain days or during peak hours. In Jakarta, they use an odd-even system, where cars with odd or even number plates are only allowed to enter certain roads on certain days. I suggest that the Ministry of Transport and urban planning authorities consider this method and start a study on this policy so that vehicle rationing can be implemented in the near future, as we move towards making Kuala Lumpur or the Klang Valley a metropolis where vehicles keep increasing from time to time. Tan Sri Speaker, that concludes Shah Alam's debate, and I ask for support.

Mr ChairmanEN

Good, next I invite Pengkalan Chepa.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Thank you, Tan Sri Chairman. I will begin with Item 020100 – Land Public Transport Agency (APAD). The issue relates to bus operators from Singapore. I want to draw the ministry's firm attention to the fact that the demand of Singaporean operators to obtain express bus permits in Malaysia is not a new issue. For decades, Singapore has been operating in our domestic market through the back door, using Malaysian companies that Ali Baba their valid permits. This is a clear practice that violates the law

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

...undang but has continued for so long because of weak enforcement and lax policy in the land public transport sector. When the government began to tighten monitoring and strengthen regulations, operators who depend on this illegal modus operandi began to feel squeezed, and pressure then arose for the government to reopen express bus permits to foreign companies in order to legitimise operations that previously ran outside the legal framework. I wish to stress that our National Public Transport Policy is still far from as solid as it should be, is still not stable, and needs major policy corrections, not space given to foreign operators to enter the Malaysian market. Priority must be given to local operators, the continuity of the industry and the sovereignty of the land public transport sector. Mr Chairman, the reports we have received also show that there are tour bus operators registered in Singapore selling tickets in the Malaysian domestic market. Yet the Land Public Transport Agency (APAD) has already made clear that foreign operators are only permitted for overnight stay tours and are not allowed to provide express services or sell tickets online in Malaysia. The Ministry of Tourism, Arts and Culture (MOTAC) has also set out clear guidelines for these foreign tour bus licences. We cannot allow this to continue, and the government must take firm, drastic action, and enforcement must be strengthened. Why, Mr Chairman? Firstly, local express bus operators have invested millions of ringgit to comply with licensing conditions, safety standards, maintenance and also vehicle age limits. They are bound by the strict guidelines of APAD and also MOTAC. It would be highly improper if foreign operators were given leniency so that they escape the same conditions. This is not competition; this is an industrial invasion that destroys fairness in the market for this type of transport vehicle. Secondly, there are differences in technical standards and vehicle age limits between Malaysia and Singapore. Indeed, there are reported cases of buses exceeding the age limit detected during inspections in Malaysia that came from Singapore. This issue concerns the safety of the people; it is not a small matter that can be swept under the carpet.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Thirdly, if Singapore operators are allowed in, they will enjoy all their operating costs in Malaysian Ringgit: fuel bought domestically is cheaper than in Singapore, maintenance is cheap, vehicle tyres, spare parts, tolls and operating costs are also cheap. But their profits will be collected in Singapore Dollars. They will gain a competitive advantage that local operators cannot possibly match. This will kill the Malaysian express bus industry, not merely undermine it. Therefore, I urge the government on two matters.

Datuk Dr. Ahmad Marzuk bin ShaaryPAS · PNPengkalan ChepaEN

Firstly, MOT, in the House today, please state the government's official position on this demand. This is because I have heard rumours that the government may consider allowing these Singapore operators to operate in our country. So I want to ask the government: will the government reject or consider their request? If this proposal for a change in policy is to be made into a task force, a joint MOT policy must first be formed to assess the implications for security investment and the continuity of the local industry. The second point, Tan Sri Chairman, I want to mention the KLIA aerotrain, which has come under criticism following technical disruptions that recurred 19 times within the three months since it began operating. Among the factors widely reported are signalling problems, drainage pump failures, power supply damage, and unexpected incidents such as passengers forcibly opening doors. Many users have described this damage as an embarrassment to the nation and have questioned the effectiveness of management and the waste of public funds worth RM456 million. Therefore, I wish to raise three matters. First, to what extent is APAD playing a role in investigating this matter, and when will the aerotrain audit be released? Second, has the government studied the risks arising from this case, and what measures have been drawn up to prevent this problem from recurring? And finally, Tan Sri Chairman, what was the total amount of penalties imposed on the KLIA aerotrain contractor operator during this defect liability period? That is all, thank you.

Mr ChairmanEN

Good. Next, I invite Bangi.

Thank you, Tan Sri Chairman. I begin my debate by extending congratulations and commendation to the Ministry of Transport for its determination in introducing initiatives to improve road safety. This is a political commitment and resolve that we have never witnessed in previous administrations. I now refer to code 020100 – Land Public Transport Agency (APAD). I welcome the increase in allocation for next year, namely approximately RM18.6 million, Tan Sri Chairman, compared with RM14.5 million this year. This allocation is important to ensure sufficient support for APAD. Regarding APAD, it is reported that APAD, as Pengkalan Chepa also mentioned earlier, will open an investigation paper concerning the KLIA aerotrain system due to issues of service disruption of the system. I would like to know, has the investigation begun? Has it been completed? And if it has been completed, what are the findings of the investigation carried out by APAD? Still on APAD. I also refer to the suspension of Aeroline bus operations, which was due to what is alleged to be misuse of licence by picking up and dropping off passengers at locations not permitted. The company is reportedly repeatedly operating outside the terminal without permission despite having been warned, Tan Sri Chairman, and has also been issued a show-cause letter. This issue has become a controversy, Tan Sri Chairman, in which APAD has been blamed, and the ministry too has been blamed. Yet it is the company that failed to comply with its operating licence. Rules, Tan Sri Chairman, must be obeyed. Perhaps in the past the authorities turned a blind eye, but under this MADANI Government, we cannot tolerate repeated offences. Our people, Tan Sri Chairman, like to take Singapore as an example, supposedly a developed nation. But it is also our own people who accept non-compliance and violation of rules just because it makes things easier for them. If buses pick up passengers at places where they should not, this endangers passengers and also other road users, Tan Sri Chairman. So, if anything undesirable happens, ultimately it will be the authorities who are blamed. Therefore, I hope the ministry can use this opportunity to explain clearly so that there is no more controversy outside concerning this Aeroline issue. I next refer to code 020300, Tan Sri Chairman, Road Transport. Here there is a reduction in allocation from RM738 million this year to RM701 million for next year. I would like an explanation from the ministry as to why this reduction has occurred. Because, I am concerned, Tan Sri Chairman, that it affects our efforts, the ministry's efforts, to make our highways and roads safer. In addition, I also want to express my support for the operations of JPJ against overloaded heavy vehicles. I appreciate the Minister's firmness in this matter, which once again shows the ministry's political resolve to resolve this issue that has dragged on for a long time. And we know there is heavy pressure― in this House too many have raised heavy pressure from vested interests regarding JPJ's operations, with claims that it affects transport costs and causes delays and so on. I do not deny that there may be some truth to this, Tan Sri Chairman, but in matters of road safety, we cannot compromise. Because previously there was no enforcement, so when enforcement comes, there is a cost, and so people say do not be too strict. It cannot be like that, Tan Sri Chairman. I also want to obtain the latest data from JPJ on the action taken against overloaded heavy vehicles: the number of summonses issued, the number of companies and owners whose permits have been suspended or completely revoked. In addition, I also want the latest status of the implementation of mandatory speed limitation devices, or SLD, for heavy vehicles, which I understand came into force on 1 October last. What is the percentage of heavy vehicles that have installed SLDs so far? And what action will be taken against heavy vehicle companies that do not comply with this mandatory implementation, Tan Sri Chairman? Finally― sorry, two more matters. Next, code 040200 under the New Policy, namely Modernisation of JPJ Enforcement. For this, I see, Tan Sri Chairman, that RM18 million has been allocated to the ministry. I would like details on this initiative because the amount disbursed is quite a large sum of RM18 million.

Finally, Tan Sri Chairman, I also want information from the ministry on what plans the ministry has to obtain revenue for the ministry itself? I ask this question because I refer to reports we have received, news reports from several weeks or several months ago, which revealed that 50,000 taxi and bus drivers have received social protection contributions from the ministry, and this amount or fund comes from the proceeds of bidding for special number plates implemented by the ministry. So, I want to know, what is the ministry's plan to further increase revenue so that ultimately this revenue can be channelled back to initiatives that will ultimately help the people? That is all, Tan Sri Chairman. Thank you. Bangi begs to support.

Good, thank you. I invite Padang Serai.

Mr ChairmanEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Tan Sri Chairman. Statistics from media reports such as those published by Sinar Harian, MalaysiaGazette and Astro Awani prove a sad narrative. The heavy vehicle tragedies seem to have no end. Heavy vehicles using the right lane illegally, lorries carrying excessive loads and drivers who do not get enough rest. These are common sights that we witness, but it seems it is not common for the ministry to take sufficiently drastic and effective action. The Honourable Member, Tan Sri Chairman, now let us focus attention on the programmes and allocations that should address this issue. Under Programme 1: Management, Activity 4: Land, Item 010400 has functions which, among others, state formulating policy and legislation to support green technology and implementing service operation functions. My question is this. Where is the specific emphasis and concrete commitment to stricter and more forceful enforcement against heavy vehicles? These functions appear too general and seem to blur the focus on the critical road safety issue caused by heavy vehicles.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

What is more worrying under Programme 2: Transport Services, Activity 3: Road Transport, Item 020300, clearly states its functions include― (c), enforcing road transport laws committedly and with integrity.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

This is the activity most directly related. However, when we look at the financial allocation given, a major question arises about the ministry's real commitment. Tan Sri Chairman, allow me to invite this august House to look at the expenditure breakdown by Code (General Object) and Activity. For Activity 020300 – Road Transport. The allocation for 2026 is RM701.985 million. This amount seems large on the surface. However, what is the actual breakdown of this allocation for enforcement, specifically to tackle heavy vehicles? Is this allocation sufficient to add more enforcement officers, purchase sophisticated equipment such as weigh-in-motion sensors, smart speed cameras and monitoring systems capable of detecting illegal heavy vehicles in real time. We, we look instead under the New Policy, there is Activity 040200 – Modernisation of JPJ Enforcement, Item 04200 with an allocation of RM18.804 million for 2026. The question is, is this amount adequate for a modernisation that is supposedly comprehensive? How many new enforcement vehicles have been purchased? How many units of overload detection devices, portable weigh bridges to be installed at hotspot locations? These details are very unclear and this raises doubts as to whether this is merely a project announcement to placate the public, rather than a robust action plan. Compare this with the large allocations channelled to other infrastructure development projects, which may have long-term impact but neglect the urgent need to save lives today. Tan Sri Chairman, let us next look at the outcome performance promised under Outcome 2, compliance with the law. There is a KPI of the percentage compliance rate with speed limits in hotspot areas. The target is 100 per cent for 2025 and 2026. A target of 100 per cent is a good idealism. But

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

how is this to be achieved without more aggressive enforcement strategies and adequate allocations? We are informed of a worrying trend, heavy vehicles using the right lane. Is it the case that merely a 100 per cent target on paper, without a significant increase in enforcement capacity, will resolve this issue? This is like "trying to hold salt while seeking to stop a storm." Tan Sri Chairman, as the last speaker, Tan Sri Chairman, on this issue of heavy vehicles. With modern technology today, dashcams and so on, we see every day road users breaking traffic rules, abusing the law and so on. I call upon the Ministry of Education, the Ministry of Transport, through the Honourable Minister, to give a convincing explanation to this House and to the people of Malaysia. What are the specific strategic plan and detailed financial allocations under Item 020300 and Item 040200 that are specifically allocated to strengthen enforcement against heavy vehicles? Why is the target for reducing the Road Death Index so static and not reflecting a determination to reduce accident rates more significantly? Thirdly, how does the ministry ensure that this large allocation genuinely trickles down to field procedures and does not end up exhausted at the administrative level and in large infrastructure projects alone? Thank you, Tan Sri Chairman.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

Good, next I invite Beruas.

Mr ChairmanEN

Thank you, Tan Sri Chairman, for allowing me to debate on the Ministry of Transport. The item I wish to debate is Item 020300 – Road Transport. I request that the government review the regulations on the load weight for vehicles. Operators in the transport industry complain that the current regulations are unreasonable. For example, the unladen body weight of a lorry of 3,090 kilograms, or BTM 3,090 kg, is only permitted a gross weight with load of 5,000 kilograms or BTM 5 tonnes. This means such a lorry can only carry 1,910 kilograms.

Dato' Ngeh Koo HamDAP · PHBeruasEN

For such a lorry, if the load does not exceed the wall of the lorry, which is the same height as the lorry head, the load, if loaded with palm oil, is approximately 4.5 metric tonnes. This means the law only permits approximately two metric tonnes, but the load commonly carried is 4.5 metric tonnes. If such a load does not endanger anyone, the regulation should be changed to permit such a load. A second example, tank loads that follow JPJ specifications. Full loads must be permitted regardless of their weight, because if they are not filled it is very dangerous. If a lorry carries a load that is not full in the tank, the liquid in the tank will slosh and it is dangerous to operate such a tanker lorry. Every time there is enforcement, many lorries suddenly stop operating and are abandoned at the roadside. Operators in the transport industry are very important for the development of our country. They are not criminals. So, I hope the regulations can be harmonised so that the permitted load is reasonable. But— and when the load is already reasonable and transport industry operators do not comply with it, we must be firm with them so that safety on the road can be preserved. The second matter I wish to bring to the government is the action of listing or black-listing vehicles said not to have paid summonses. Legally, these summonses are actually offers to compound. An offer to compound means that a person alleged to have committed an offence is offered to pay a sum of compound without going to court. But with a policy of listing everyone said not to have paid these summonses, we have violated the principle of criminal law, namely "Innocent until proven guilty." So, the Minister recently stated there are 5.5 million unpaid compound summonses. Surely among these 5.5 million, there are many compounds, these offers to compound, these summonses that were issued wrongly or not in accordance with the law. I myself once nearly became a victim, when I was at university, I was said to have parked my car in a place where it was not permitted while I was only using a motorcycle. So, sometimes, there are cases where vehicle numbers were mis-written by officers. Sometimes these number plates are used by criminals and sometimes

Dato' Ngeh Koo HamDAP · PHBeruasEN

For such lorries, if the load does not exceed the lorry walls that are the same height as the lorry cabin, the load, if loaded with palm oil, is about 4.5 metric tonnes. This means the law only allows about two metric tonnes, but the load commonly carried is 4.5 metric tonnes. If such a load does not endanger anyone, the regulations should be changed to allow such a load. The second example, the load of tanks that follow the specifications of the Road Transport Department (JPJ). A full load must be allowed regardless of its weight, because if it is not met, it is very dangerous, because if a lorry carries a load that is not full in the tank, the liquid in the tank will slosh and it is dangerous to carry such a tanker lorry. Every time we see enforcement, many lorries suddenly stop operating and are abandoned at the roadsides. The operators in this transport industry are very important for the development of our country. They are not criminals. So, I hope the regulations can be harmonised so that the permitted load is reasonable. But— and when the load is already reasonable and the transport industry operators do not follow it, we must be firm with them so that safety on the road can be preserved. The second point that I want to bring to the government is the action of blacklisting or black listing vehicles that are said not to have paid summonses. In legal terms, this summons is actually an offer to compound. An offer to compound means that a person who is said to have committed an offence is offered to pay a certain amount of compound without going to court. But with the policy of blacklisting everyone who is said not to have paid this summons, we have violated the criminal law principle, namely “Innocent until proven guilty.” So, the Minister recently stated that there are 5.5 million of these compound summonses that have not been paid. Certainly among these 5.5 million there are many compounds, these offers to compound, these summonses, that were issued wrongly or not in accordance with the law. I myself have once nearly become a victim, when I was at university, it was said that my car was parked in a place where it was not allowed, while I only used a motorcycle. So, sometimes, there are cases where the vehicle number was wrongly written by the officer. Sometimes this number plate is used by criminals and sometimes

Dato' Ngeh Koo HamDAP · PHBeruasEN

...officials do not understand the rules, and summonses are issued that should not have been issued. Many times, summonses also arrive after many months, and the driver and the vehicle owner have already forgotten about such an incident. I will end with my proposal. I propose that the government be firm in taking cases to court if a summons or compound, offer to compound, is not paid. This will compel and cause many people who commit offences to scramble to pay the compound for fear of being taken to court. Meanwhile, it gives rights to those who are not guilty, to defend their position without being forced to admit guilt even though they are not guilty.

Dato' Ngeh Koo HamDAP · PHBeruasEN

I hope this principle can be upheld by this government so that those who are not guilty are not forced to pay a compound for fear of being blacklisted. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Alright, I invite Kuala Krai.

In the name of Allah, the Most Gracious, the Most Merciful. Thank you, Tan Sri Chairman, for giving Kuala Krai the opportunity to take part in the debate at the Committee stage of the Ministry of Transport. Kuala Krai wishes to refer to the following items. The first is B.031100 – Airfare Subsidy. I would like to raise several questions regarding the issue of setting a ceiling price for air tickets. First, what is the government's basis for determining this ceiling price? Is it truly based on demand data and the operating costs of airlines, or is it only a short-term measure to ease public pressure during the festive season? The second: does the government realise that, even though a ceiling price is set, the public still bears the burden of incidental charges such as service fees, baggage charges and airport taxes, which are not included in that ceiling? If the government truly wishes to reduce the burden on the public, why is there no mechanism to control price increases throughout the year, not just during the festive season? Is there

an acknowledgement by the government that there is a structural problem in the aviation industry that needs to be corrected? Tan Sri Chairman, B.040200 – Modernisation of JPJ Enforcement. As we are aware, the government is now offering a discount of up to 70 per cent for summonses that can be compounded. This is a one-off measure to reduce arrears of more than RM6 billion nationwide. However, the important question I want to raise is that the government has announced that, starting 1 January 2026, a new principle will be implemented, namely the less you delay, the less you pay. Under this system, early payment is given a discount, while delay exceeding 60 days may lead to court action and also blacklisting, or blacklist, which prevents road tax renewal. My question is, will old summonses, including those outstanding for years, also be included in this new system, or will the government only focus on new summonses after 1 January 2026, with old summonses also subject to the new, stricter compound structure? The second question is what is the government's mechanism for settling the remaining old summonses after the 70 per cent discount period ends? Will automatic blacklisting action continue, or will the government introduce a transition phase before strict action is implemented? Tan Sri Chairman, Item P.12100 – New JPJ Office. Is it through this allocation that the item, namely the opening of a new JPJ office in Kuala Krai, is included? I would like to draw the ministry's attention to the urgent need to open a JPJ office in Kuala Krai. Today, residents of Kuala Krai, such as those in Sungai Sam, Chuchoh Puteri, Sungai Mel and other areas, rely on the JPJ office in Machang, the nearest office, which is more than 60 kilometres away. However, the reality is that JPJ Machang is always congested, crowded and unable to accommodate the number of customers coming from various districts, namely Machang itself, Kuala Krai, Tanah Merah, Pasir Puteh and even Jeli and so on. The public has to queue for a long time, taking numbers as early as the morning, and some have to come back the next day because of limited capacity. Tan Sri Chairman, I refer to Item P.00800, namely the Project to Rehabilitate and Strengthen the East Coast Railway Line. The government has

introduced the newer DMU train sets several years ago, which are faster and more efficient. However, the reality is that these DMUs still cannot be run at optimum speed because the tracks on the East Coast route are still dilapidated, damaged and do not meet the actual speed standards of modern trains. The question is, what is the actual timeframe for the completion of the repair of the Kuala Krai–Kuala Lipis track, continuing to Gemas? The public has heard too many announcements but seen too little progress on the ground. Can the government provide a transparent timeline, not one that is "being implemented" or "at the study stage", but a concrete completion date? When will the new building related to the same issue, the issue of this railway facility, be started? When will construction of the new Dabong railway station building begin, after the approval given earlier? Tan Sri Chairman, referring to Item P.13000, namely the Construction and Upgrading of Airport Infrastructure. On 14 November 2025, KLIA Terminal 1 suffered severe leaks during heavy rain. With KLIA being nearly 30 years old, it certainly needs comprehensive maintenance and not just repairs to certain parts. I would like an explanation from the Honourable Deputy Minister: what is the plan of MOT, through MAHB, to ensure comprehensive maintenance can be carried out, because KLIA was among the most modern airports at one time, but now its roof leaks and its aerotrain is also damaged even though it was replaced with a new set valued at around RM456 . This matter greatly damages the country's image because KLIA is an important and main gateway. Why were the roof upgrade works carried out without sufficient emergency measures to face heavy rain, and what is the assurance that these upgrading projects can be completed as quickly as possible, especially ahead of Visit Malaysia 2026? Thank you, Tan Sri Chairman.

Mr ChairmanEN

Alright, next I invite Rantau Panjang.

In the name of Allah, the Most Gracious, the Most Merciful, peace be upon you, the mercy and blessings of Allah, and greetings of wellbeing. Thank you, Tan Sri Chairman, for giving me the opportunity to join in debating the Committee stage of the Ministry of Transport.

Regarding Item 00800 – Project to Rehabilitate and Restore the East Coast Railway Line — Strengthening the East Coast Railway Line. And also 00900 – Enhancing KTMB's Capacity. On behalf of the people of Rantau Panjang, I once again express my thanks for the approval to revive the railway route from Pasir Mas to Rantau Panjang, as announced in this august House. However, the issue that arises is that I would like to know what the government's plan is in the approval process. What is the future timeframe? Because we do not want the existing train, which takes almost 14 or 15 hours to travel from Kelantan to Kuala Lumpur, to be the only option. If the train continues using the same system, it will certainly not have a major impact on the people and passengers, and likewise on the economy. So, what is the plan to upgrade so that it has the maximum impact on passengers, and at the same time can attract many tourists, especially to connect with neighbouring countries. As we all know, the ECRL project is expected to be completed in 2027. So, in line with the development of this technology, does the government intend to upgrade the railway route to the East Coast of Kelantan–Kuala Lumpur into an ETS line, as has been implemented in other states, so that the benefits go to the people? What is also the plan in this development? Will there be a centre for trade, such as cargo management facilities and so on, because in Rantau Panjang there is a halal park, a halal industry located near the old railway line, but there is no facility link with rail cargo. So, I hope it will be included in the plan so that efforts are made to enable goods produced from this halal industry to be taken directly to Thailand and onward through this railway service. I also want to know what studies have been carried out regarding the safety of the bridge? Because the existing bridge is old. So, to what extent have studies been carried out on the use of the existing bridge, or will a new bridge be built, and likewise the existing railway track. What downstream industrial projects will be established? Including the new railway station that will be established when this new route opens, and what

cooperation has been made with the project that will be built in the near future, namely the enlargement of the ICQS in Rantau Panjang. Because the old railway station is only beside the location of the old ICQS, the current ICQS. So, I would like to know the extent of coordination made so that this project can have the maximum impact on the people. So, we hope that this project will have a major effect, especially on the economy and tourism, and also facilitate security control.

[Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] Mr Speaker, I touch on 1400, relating to MIROS, where on 27 September last year a lorry accident occurred at the Bukit Kajang Toll Plaza, in which a cargo lorry crashed into three vehicles, resulting in the death of a baby. So, I would like to know the extent of strict action taken, especially against the drivers, particularly to ensure they comply with safety instructions. And to what extent investigations have been carried out on this case, and likewise the issue of falsification of vehicle maintenance records, including tyre maintenance and so on. So, what action has been taken by the government? Next, I am also interested in touching on Item 010000 relating to the management of air tickets during the festive season. So, taking into account the needs, especially of the people in Sabah and Sarawak, who during the festive season have to face air ticket prices that are expensive, up to two or three times higher, what is the government's plan to ensure that this ceiling price is not exploited by airlines, which causes a heavy burden, especially on residents in Sabah and Sarawak, so that this matter can benefit especially passengers in the B40 group. Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Rantau Panjang. I invite the final debater, the Honourable Member for Jelutong.

Thank you, Madam Chairman. I would like to begin my debate by referring to Item 050600 – Motorcycle Safety Programme. Initially, I was not listed as a debater. But I applied to debate because today, before coming to Parliament, I visited the family of a Form 5 student, the late Jason Lee, who died when the motorcycle he was riding was involved in an accident with a bus. I was very saddened and grieved to find that the late Jason Lee was a Form 5 student studying at St. Xavier's. And although he was riding the motorcycle, and I believe had already undergone courses and training to ride a motorcycle, the accident still happened. So, I request, and not only this incident. There are far too many incidents involving motorcycles, where motorcyclists, for the most part, become victims of accidents. So, I request that the ministry, if possible, give attention to this matter and place emphasis on safety aspects, where motorcyclists are given procedures and guidance in training to ride motorcycles in a safer manner for their own sake. I only ask for an explanation from the Minister on this matter. At the same time, I am very interested in the details given by the Minister regarding the issue involving the ECRL project. And here I touch on Item 08000 – Project to Rehabilitate and Strengthen the East Coast Railway Line. Here, I fully support the initiative taken by the ministry. Although I do not live on the East Coast and I am not a Member of Parliament for the East Coast, I was impressed by the Minister's explanation that the amount to be spent on construction costs for the East Coast Rail Line is RM50.27 billion, where, apart from construction costs, the development costs involved are RM24.69 billion. So, I do not know why it has become a polemic when the Mutiara LRT line in Penang involves only RM17 billion compared with the ECRL project involving a sum of RM50 billion, where the amount is far greater than the amount spent on the Mutiara LRT project in Penang.

So, congratulations and well done to the Minister and the ministry. We see that we— although our government is one that is not supported by the state governments of Kelantan, Terengganu and Pahang, the Kelantan and Terengganu state governments, we still ensure that infrastructure that benefits the people in those areas continues to receive our attention for implementation. The last issue I want to touch on is the incident that occurred in Langkawi recently, where 30 bodies were seen floating in Langkawi in November. However, I want to request details, Item 010200, namely Maritime. What are the steps that will be taken by the maritime authorities to ensure that this incident, which involved a boat carrying Myanmar nationals, entering Malaysian waters, involving approximately 30 Myanmar nationals who attempted to enter Langkawi, who have already fallen victim to traffickers who tried to bring them in through Malaysian waters. However, I request an explanation of what steps will be taken by the maritime authorities to tackle and ensure that this incident does not recur. Madam Chairman, thank you. I beg to support.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Jelutong. Now I invite the Honourable Minister to reply. Time 30 minutes.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Thank you to Madam Speaker, Madam Chairman. The Ministry of Transport Malaysia welcomes Budget 2026. The Unity Government, the MADANI Government, with the theme of the MADANI Budget, the Fourth People's Budget, to ensure that the economic prosperity achieved can be translated into improvements in the quality and standard of living of the people, including through the transport sector. The Budget 2026 initiatives presented by the Most Honourable Prime Minister truly reflect responsible and balanced fiscal management to support and accelerate the country's reform agenda. In addition to addressing the main issues of the people, a total of RM6.768 billion has been allocated by the government to the Ministry of Transport for the overall estimated operating and development expenditure for the year 2026, an increase of 2.59 per cent compared with last year's allocation. MOT is confident that, through the allocation under Budget 2026, it will continue to ensure the sustainability and viability of the country's transport services sector. Madam Chairman, through the operating expenditure allocation for 2026, MOT is allocated RM1.659 billion, a decrease of RM43.2 million or 2.54 per cent compared with last year. Meanwhile, development expenditure allocation increases by 4.38 per cent compared with 2025, namely RM5.109 billion, for the implementation of 125 projects and programmes that have been approved under Rolling Plan 1 of the Thirteenth Malaysia Plan 2025. Of this amount, 94 projects or programmes are existing continuing projects, 11 projects are in the OE to DE class, and the remaining 20 projects or new programmes are approved under Budget 2026. Madam Chairman, the Ministry of Transport thanks the Honourable Members who have delivered debates on Budget 2026 for MOT at this Committee stage. Allow me to answer several questions that have been raised by the Honourable Members. However, within this short time, it is quite impossible for me to answer every question that has been raised. I will answer several major themes, and for specific questions, I will try to answer orally and ask the secretariat to provide oral answers to the Honourable Members on the specific questions. The first, in the land sector. Madam Chairman, many Honourable Members have asked about the status of the LRT 3 project.

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

Indeed, I know this project has attracted public attention, and many have asked when this project will be completed or when service will begin. For the information of the Honourable Member, the latest target date for the operation of the Light Rail Transit 3 Shah Alam Line has been revised to 31 December 2025, which is the turn of the new year this year, namely on the last day of December 2025, compared with the previous revised target of 31 September. Based on the latest developments, the LRT 3 Project, or the Shah Alam Line, is in phases

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

I do know that this project has attracted public attention and many have asked when this project will be completed or when service will begin. For the information of Honourable Members, the latest target date for the operation of the Shah Alam Line Light Rail Transit 3 has been revised to 31 December 2025, which is the threshold of the new year this year, that is on the last day of December 2025, compared with the previous amended target of 31 September. Based on the latest developments, the LRT 3 Project or the Shah Alam Line is in phases

Tuan Loke Siew FookDAP · PHMinister of Transport · SerembanEN

the final testing and commissioning to ensure reliability and safety. If all these T&C activities can be completed, the route can be opened towards the end of December. The ministry, together with Prasarana Malaysia Berhad and the relevant authorities, is giving full priority to safety, operational reliability and technical compliance before the opening date can be confirmed definitively. Any further developments will be announced from time to time once the final verification process has been finalised. I want to state that our planning and our target are indeed 31 December. However, this is very much subject to the results of our testing, the results of our tests. Because in this rail service, one of the most important things is the final testing that we are currently carrying out. Over these past few weeks, we have been carrying out free fault testing, or free fault run, to ensure that when it is opened, no technical disruptions and so on will occur. So, after this, there are of course some more tests, and also tests to ensure operational readiness in all aspects of operations, including the stations, including the tracks, including the staff and so on. So, all of that we are indeed carrying out. We have a period from now until 31 December. Not even two months. Just a little over one month. Therefore, we certainly hope it can be finalised and implemented by 31 December. Nevertheless, the final decision on when the opening date must be finalised will be made after the authorities are satisfied with all the tests that will be carried out. So, I hope the Honourable Members can give time and also trust to the ministry to ensure that all these matters can be implemented before the operation date can be announced. For your information too, Rapid Rail Sdn Bhd has appointed 956 workers for the purpose of preparing the operation and maintenance of this LRT 3 service. The appointment covers various categories of staff, including operations, technical, engineering and support teams to ensure the system can function smoothly, safely and efficiently when it begins operating in future. That concerns LRT 3. Next, to answer...

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Yang Berhormat. Shah Alam.

Tuan Loke Siew FookDAP · PHSeremban

Ya.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

I also raised the matter of the first-mile and last-mile services, for which we have yet to receive complete information from the local authorities (PBT). So, I would also like to request an explanation from the Honourable Minister regarding that matter. However, we fully, 100 per cent, place our trust in the Honourable Minister and also in the Ministry of Transport. Thank you.

Tuan Loke Siew FookDAP · PHSerembanEN

First-mile and last-mile is not solely dependent on buses. Indeed, in terms of the stop-start buses, those exist. But first-mile and last-mile are also linked to the e-hailing sector. So, the e-hailing sector too is indeed making efforts to ensure that first-mile and last-mile services can be strengthened and expanded in the surrounding areas together with these LRT stations. Prasarana also provides the DRT service, and DRT is also one of the modes to ensure that journeys between first-mile and last-mile can be expanded. Next, Madam Chairman. Honourable Jerantut requested details― there are many details. I will submit them in writing to Honourable Jerantut. As for the proposal to open a new branch in Jerantut, we are trying to see whether it can be implemented. However, the JPJ Mobile counter is always being moved around, and we understand that it is rather difficult to provide offices in every district, in every place. Nevertheless, in strategic and suitable areas, we will consider expanding branch offices throughout the country. But, we are more focused on mobile counters and also the use of kiosks. These kiosks can be provided in greater numbers in key areas or strategic areas. Madam Chairman, I would like to move on to an issue that has also been widely questioned and debated earlier. Regarding the ministry's enforcement on the issue of overloaded vehicles. I want to state frankly that I am somewhat disappointed and saddened by the views of the Honourable Members, including those from the Backbenchers, as if they are trying to give

Tuan Loke Siew FookDAP · PHSerembanEN

a perspective or are trying to act as spokespersons for those who carry these excessive loads. In this matter, I hope all Honourable Members can support the government's efforts and support the Ministry of Transport's efforts to fight an issue that has persisted for decades. This is not a political issue. This is a safety issue, and I hope all Honourable Members, whether Backbenchers or the opposition, let us jointly fight this issue. Because this issue concerns human lives. This is not a matter of dollars and cents. This is a matter of human lives. Some Honourable Members have asked that we give leniency, give time, give further financial support because they want to adapt to the new regulations. I want to stress in this august House that these are not new regulations, these are not new laws. They know what their BDM is, how much their load weighs. But this is a phenomenon that has existed in our country for decades, for years, this issue of overloading. The issue of overloading is not something new. Honourable Members, do not speak as if we have introduced a new policy or new regulations. I am merely enforcing existing regulations and laws that these operators have been violating for decades... [Applause] Some have asked for a soft landing, a transition period. I want to ask those Honourable Members who said that: in the matter of accidents, is there a soft landing? Is there a transition? If we give a transition period now, give a soft landing now, which Honourable Member can guarantee that, during the period when I do not enforce, no accidents will occur? Please stand up, if there are... [Applause] Whichever Honourable Member asked me to do a soft landing, please stand up and say, "I can guarantee there will be no accidents during that period." Can you or not? Imagine what would happen if, under pressure from the Honourable Members, I announced a soft landing here. Tomorrow all those operators would― they could celebrate, they could hold a party, they would no longer care about enforcement, they would carry as they please. As heavy as they like, as they please. If tomorrow one of them runs over and kills someone, who is responsible? Is the Honourable Member who asked me for a soft landing responsible? Is the company responsible?

Tuan Loke Siew FookDAP · PHSerembanEN

Yes, the pressure is great. Every day I receive memoranda from chambers of commerce, from associations, there are lorry drivers who want to stage a demonstration in front of Parliament this Wednesday. But on this issue, I want to state that, as Minister of Transport, I will not compromise... [Applause] No negotiation. I have said so in this august House. If you want us to discuss how to facilitate and help the sector make the transition, I welcome that. But give constructive views. Do not ask us to slow down on enforcement. The moment we say soft landing, this matter will fail. Because I have observed over the past 10, 20 years that previous transport ministers, when faced with pressure, did a U-turn, a soft landing. The moment there is a soft landing, there will be no landing. There will be no soft landing, there will be no landing, there will be no solution.

Tuan Loke Siew FookDAP · PHSerembanEN

Only with firmness, resolve and political will, a strong political will, can we fight this issue. Without a strong political will, with pressure from Honourable Members, the minister will do a U-turn. Those outside will celebrate. I want to tell you— yes, I understand that Honourable Members face pressure from all sorts of quarters, but also listen to the public, listen also to society at large, see how many support us not to enforce strictly. Many support us. So, do not worry, those who object are only a small number, those who support strict enforcement to fight this issue are far more numerous. What we know is that there are operators, lorry drivers, who are pressured in terms of their wages, in terms of their rental rates and so on. This comes from large companies, and we will deal with these large companies too. We want to help lorry drivers, not sacrifice lorry drivers. In this matter, we know that these small lorry operators are under pressure. Now they say the rental rates have not been increased, the wage rates have not been increased. We will deal with the companies and also the industries that want to raise prices and so on. I have already raised it in Cabinet, asking that KPDN come in too. Antipencatuan, Anti – Act Profiteering and so on. If any industry attempts to raise prices unreasonably, they will be subject to action.

Tuan Loke Siew FookDAP · PHSerembanEN

But in terms of rent or rates to the operators, they must— they must make adjustments, because all this time the victims have been the operators, the small lorry drivers. They are pressured in terms of their rates. When I make this policy to carry out strict enforcement, the big industries and big companies must adjust the rates for these drivers. And I hope that fair wages and salaries are paid back to the drivers. If these small lorry operators are forced into overloading, they bear the cost, not only in terms of— in terms of road safety alone. Their lorries break down quickly. And the greatest— the greatest calamity is to the general public, accidents occur. Every day Honourable Members talk about potholed roads. In Sabah right now there is an election campaign, the roads are full of potholes. Why is the condition of our country's roads like this? It is not that we do not have money for maintenance. Just now I held a Cabinet meeting on road safety. The JKR is there, the KKR is there, the Ministry of Works (KKR) is there. They say that's right, our maintenance costs billions of ringgit every year. But why do our roads deteriorate quickly even though they are maintained, deteriorate quickly. Among the problems is overloading, this overloading is excessive. More than 80 per cent, more than 100 per cent even. So, this must be tackled. Ask them, does Thailand have overloading? Thailand today has no overloading because of the firmness of its government. Does China have overloading? None. A company from China recently, I heard, said to people in the market, "Who doesn't overload?" If they say that, they must— in China, nobody dares to overload, no operator dares to overload. This is the firmness that we as a government need to solve this problem. [Applause] Because, in the long term, in terms of benefit to the country, there are many benefits if we can resolve this issue. Firstly, these drivers will be calmer, they need not fear every day of being caught by enforcement officers. I know that in the past there were people who said, later you will have to pay bribes, you will have to "pau". Every month you have to pay some bribe so that overloading will not be issued a summons and so on.

Tuan Loke Siew FookDAP · PHSerembanEN

If there is cooperation like that, there is no overloading, no need to "pau". Right? [Applause] There is no issue of these bribes. I do not want JPJ to be tainted with such an image, I do not want any of our enforcement officers to be given such a very negative image. As if we can be "pau'd", we can— eating pau is fine. But do not be "pau'd". So, I hope, let us work together to ensure that this overloading issue can be resolved. If we can hold firm, hold firm for months, whatever pressure comes, we stand firm, and all Honourable Members support me, I am confident this issue will be resolved. [Applause] No one dares to threaten us. Yes, there are threats, to stage a demonstration in front of Parliament, on Wednesday. Perhaps some lorries will park in front. I will give notice now, later Members of Parliament will not be able to enter Parliament. Perhaps they will park in front of Parliament first. But if we bow to threats of that kind, we need not govern, right?

Tuan Loke Siew FookDAP · PHSerembanEN

We need not govern if we bow to threats of that kind. So I hope, Honourable Members, on this matter we must stand together. We want to help the people, we must look at the interests of society as a whole, not just a small group. Some still do not understand. We must help them understand. I know there are technical issues and so on, we are trying to resolve them, we want to facilitate permit applications more quickly. In Sabah and Sarawak there is the issue that the axle load is lower than in Peninsular Malaysia. As raised by Honourable Stampin to me. I know there are operators in Sarawak and Sabah who complain. They say the axle load in Sabah and Sarawak is lower than in the Peninsula. That is indeed true, because this is a rule imposed by the JKR according to the specifications or the readiness of road and bridge facilities. In Sabah and Sarawak the load is lower than in the Peninsula. This we must look at, this we are looking at, we are also discussing with the JKR, with the Ministry of Works, whether the axle load between the Peninsula and Sabah and Sarawak can be equalised. I think Sarawak can move faster because the Pan Borneo has been completed. Many roads have been completed, upgraded and so on.

Tuan Loke Siew FookDAP · PHSerembanEN

So in that regard, I think we can, in that context, we can help, we will help. But do not come to this august House asking me to be lenient with those who carry excessive overloading like this. This I want to stress, I will not compromise and I will not bow to any such request. [Applause] If I become a one-term Minister, then I become a one-term Minister, that's fine. [Applause] For me, if I can resolve this issue, that will give me the greatest satisfaction, because this is a legacy issue that for decades no transport minister has had the courage to fight. [Applause] So, I hope the Backbenchers can understand that this firmness is very much needed. If I am lenient, no problem can be resolved. So, I hope Honourable Members can understand my stance. Next, the air sector...

Honourable Minister, perhaps a little, Sik. Yes, I am confident we all agree on strict enforcement to eradicate this overloading, but we also need to look at the liability issue more clearly. That is to say, in terms of the SOP. Whether it is the recipient or the sender of the goods, whether the container or the lorry. That is what may be disputed by various parties. Including also regarding VGM – Verified Gross Mass, there are containers that are said to be fine at the port, their load is— that is to say, according to the proper specifications. But when they move on the road, they are already over the limit. So, this needs to be viewed comprehensively, that enforcement ultimately takes place anywhere, including at the port or on the road. And I am confident all our users here also agree with the ministry's firm steps on this matter. Thank you.

Tuan Loke Siew FookDAP · PHSerembanEN

Thank you, Honourable Member. Firstly, in terms of containers and so on. It is true that there is weighing at the port. And of course we will make adjustments. If weighing at the port is accepted, that is not a problem. Actually, the issue of cargo weight, for containers it is not a major problem, because these containers are subject to international standard regulations, they must be loaded onto ships. They cannot exceed the load limit and so on. What we are fighting now is not about container lorries, the biggest problem for us is not

Tuan Loke Siew FookDAP · PHSerembanEN

container lorries. The biggest problem is tipper lorries, lorries that carry minerals, carry rocks, carry sand, carry timber. These are the lorries that frequently exceed their load limits.

Tuan Loke Siew FookDAP · PHSerembanEN

In terms of liability, we are looking at— the Land Division of the Ministry of Transport is still looking at how we can impose— this liability also on the consignor. Because the owner of the cargo, sometimes, we understand, lorry operators say, "I was forced, I was told I must carry this amount". If not, his contract is cancelled. So, we are seeing now that not only the operators have liability, but the consignor also has liability. So, this is what we are working out in detail on how we can enforce that law. So far we are looking at the provisions in the Akta Pengangkutan Jalan and also the Akta Pengangkutan Awam Darat, which sections we can apply. In this matter, we are indeed drafting a policy on how we impose this liability on several parties, including the consignor, so that all of those parties no longer dare, because this is one ecosystem. This ecosystem is not only the lorry drivers; we understand that if lorry drivers are given a choice, they do not want overloading. The most important party in this ecosystem is the cargo owner who hires or takes a contract with these transport companies or these lorry companies to carry their goods. So, if the liability can be placed on the consignor, we are confident that they will no longer dare to force the load beyond this limit. So, for this matter I thank you. We are indeed looking at how to handle this issue. Madam Chairman, I have only five minutes left. I want to move on to the air sector. This air sector is something I want to clarify, because the Honourable Member for Merbok asked why the Civil Aviation Authority of Malaysia (CAAM) has no allocation for next year. It is true, in the budget book there is no longer an allocation for the CAAM aviation authority. Why is that? This is a reform that we have implemented on CAAM. Because the Civil Aviation Authority of Malaysia (CAAM), since two months ago, has become a statutory body separated from the civil service. And they have

Tuan Loke Siew FookDAP · PHSerembanEN

have financial independence, with permission. Because previously they needed an injection of funds every year. As we read in this budget book, every year RM200 million is needed to be channelled to CAAM so that they can spend on their operating costs. But starting next year, we no longer need this injection of funds. Why? Because firstly, they have become a statutory body separated from the civil service and freed. That means they also have the financial capacity to pay salaries and emoluments for their staff. And in terms of their operations, they no longer need an injection of funds. Because what we have implemented is that we have reviewed and also increased the aeronautical charges. Aeronautical charges on users of our national airspace. This has resulted in an increase in revenue for CAAM. So, this is something I have answered here before, why we did that. Because for decades our aeronautical charges were never increased. Because half of these aeronautical charges come from foreign airlines that pass through our national airspace. So, we were providing a very cheap service to these foreign airlines.

Menteri.

Tuan Loke Siew FookDAP · PHSerembanEN

So, we increased those charges to raise our revenue, and the result is that we no longer need to inject funds into CAAM.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

May I ask, how much in aeronautical charges have we collected this year, please?

Tuan Loke Siew FookDAP · PHSerembanEN

We only introduced these new charges this year, 2025. So, if I am not mistaken, mid-year. Our estimate for a year is that we will collect about RM400 million to RM500 million. So, that is enough for us to bear the entire operating costs of CAAM, which previously needed a RM200 million injection. It collected only a little over RM100 million, previously, at the old rate. So, this new rate can be collected up to RM400 million a year. So, that is sufficient for us not only to bear the entire operating costs of CAAM, but, more importantly, we can raise the salaries of CAAM staff. Especially our traffic controllers, our air traffic controllers. So, of course we expect their efficiency to be better than these air traffic controllers.

Tuan Loke Siew FookDAP · PHSerembanEN

Because the efficiency of our ATC is also connected to the issues raised by the Honourable Member; delays of aircraft, delays of flights, sometimes our take-off is rather slow and so on. So, those matters are being addressed, and we expect that with better financial capacity in CAAM, various new initiatives can be implemented and introduced at the CAAM level, to help us improve CAAM's efficiency so that our national aviation can be more competitive. So, that is the answer I conveyed to the Honourable Member for Merbok. Many others have asked about it. I know there is one issue that is indeed hot, indeed big, indeed something we did not expect to happen at Terminal 1 KLIA last Friday, where rainwater poured into the terminal building. Why did this happen? As has been stated by MAHB, roof maintenance was actually being carried out on that day. The contractor's negligence: when heavy rain came, they did not move their construction materials, they simply moved off the site. So, this caused construction materials, wood and so on, to be left on the roof and caused obstructions, and the gutters, or water gutters, in the terminal building became clogged and water poured into the terminal building. That is something very, very regrettable. I know the image is very embarrassing. The image, in terms of pictures and videos, will give a very negative image of our country. That matter is indeed something very difficult to forgive. So, MAHB has of course been asked to take firm action against the contractor who, perhaps in terms of their SOP, did not do properly, causing an incident like this which will of course have a rather negative impact. This is a negative perception. We understand, we know, but the contractor who was carrying out the task must be held accountable. So, this matter will be followed up by MAHB. And other matters that we are taking note of and also action...

Kapten Azahari bin HasanBERSATU · PNPadang Rengas

YB Menteri.

Tuan Loke Siew FookDAP · PHSerembanEN

...including the aerotrain issue and so on. That is indeed a matter within our knowledge, and MAHB has also already held

Tuan Loke Siew FookDAP · PHSerembanEN

a press conference to give an explanation on that matter. If possible, Madam Chairman, could I have two or three minutes only, okay? Batu and— there was just now.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Honourable Minister, Padang Rengas asks about maritime issues and also the ETS. Can an answer be given? As well as commuter services.

Tuan Loke Siew FookDAP · PHSerembanEN

First, maritime. The shipping industry. The Honourable Padang Rengas asked about how to help shipping companies make the energy transition. This answer does exist. If it is specifically, I will answer the Honourable Member in writing. Regarding northern commuter services, what is the question?

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Please extend the Ipoh to KL commuter and also the frequency of the ETS to the north?

Tuan Loke Siew FookDAP · PHSerembanEN

Yes, firstly, Honourable Member, in terms of commuter services, the distance cannot be too long. There is a certain distance that we limit, because firstly, the commuter coaches do not have toilets. So, there is a condition in our railway scheme. Commuter services usually stop frequently. If it is too long, the time needed to complete one trip becomes very, very long. So, currently it is from Tanjong Malim to KL. That is within about one hour, one and a half hours, and so on. If we want to extend it to Ipoh, the commuter might take three or four hours to arrive.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Minister, I mean, because from the north to Ipoh it already exists. Now, Ipoh to Tanjong Malim has no commuter service.

Tuan Loke Siew FookDAP · PHSerembanEN

As for Ipoh to Tanjong Malim and so on, it is a step-by-step matter that we will look at. But the constraint we have now is that rolling stock is insufficient. Like the Northern Commuter. I want to add. We have indeed done procurement to add ten more sets for the Northern Commuter. To ensure more frequent trips between Ipoh and the north, and especially on the Butterworth to Padang Besar sector.

Tuan Loke Siew FookDAP · PHSerembanEN

That is indeed a very important sector because many people need that service. We have added, but it takes two or three years

Tuan Loke Siew FookDAP · PHSerembanEN

to complete that rolling stock. For existing rolling stock, it is indeed insufficient. I know that the situation of the Northern Commuter is rather unsatisfactory. So, we indeed hope to increase the capacity and service of the Northern Commuter and add other areas. So, once the rolling stock is sufficient, we can consider looking at the routes with high demand. Other matters, as I have said, Madam Chairman, I will ask the secretariat to answer, to give a written reply.

Honourable Minister, please answer a little regarding the issue of reconnecting the Rantau Panjang railway. What concept will be expanded? Please explain.

Tuan Loke Siew FookDAP · PHSerembanEN

For your information, I already answered that day in this honourable House. I also thank the Honourable Rantau Panjang. I have stated that Kuala Krai to Rantau Panjang will have the railway line revived now, because the Honourable Rantau Panjang has spoken many times. That line, that corridor, already exists, but the track is dilapidated because it has not been used for more than 10 years. So, in this first phase, we want to revive that track first. A lot of conservation work must be done using the existing corridor, to rehabilitate the track. But I also asked that we look at how we can integrate it with the ECRL, because that is very important. If we cannot integrate it with the ECRL, then it will not serve the purpose or will not have much added value. So, I have indeed asked MRL, namely the developer of the ECRL, to look at how to integrate it with the KTM sector all the way to Rantau Panjang. Thank you.

Honourable Minister, thank you for the explanation, and we strongly hope that the preparations will also include facilities for cargo, because we have the Taman Halal Hub in Rantau Panjang, which does not have facilities related to cargo.

Tuan Loke Siew FookDAP · PHSerembanEN

Yes. I, I, I am with the Honourable Member on this matter. My priority is indeed cargo, because if we can provide a good cargo service, of course it will become a catalyst for industrial development in the East Coast area, and this matter

Tuan Loke Siew FookDAP · PHSerembanEN

is indeed in line with the aspirations and also the national transport policy, to see how rail cargo transport can help industrial development. And indeed Rantau Panjang, we have stated that it is a strategic area where we need to place a cargo facility nearby. Not only for the community or in the Rantau Panjang area, but it has— it has a strategic advantage, because we want to attract cargo from southern Thailand so that southern Thailand can use our services as a gateway to their export market. So, that is what we are looking at, and we will try to help ensure that it can be integrated. I think that is all, Madam Chairman. Thank you for the additional time given. All other questions will be answered in writing. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Minister. Honourable Members, the question is that the sum of RM1,659,153,900 for Head B.28, Operating Expenditure Estimates 2026, be approved as part of the Schedule. [The question was put and agreed to] [Head B.28 ordered to form part of the Schedule]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The question is that the expenditure under Head P.28 in the Development Expenditure Estimates 2026 be approved. [The question was put and agreed to] [Head P.28 formed part of the Estimates] [The House resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the sitting of the House today is adjourned until 10 a.m., Tuesday, 18 November 2025. [Gavel is struck]

[The House adjourned at 6.14 p.m.]

Special ChamberSpecial Chamber

[Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Safety of Petronas Gas PipelinesSpecial Chamber

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Speaker, for giving me the opportunity. On this afternoon, allow me to raise an issue concerning the safety of PETRONAS gas pipelines. The people of Malaysia were shocked by the Putra Heights incident that occurred on 1 April 2025. The incident opened the eyes of the public, especially those who live near PETRONAS gas pipeline networks throughout the country. Residents are worried about the risks and dangers should the same incident happen again, as it did in Putra Heights. The residents' concerns are well-founded and deserve serious attention because the disaster that occurred endangers human lives and property.

The gas pipeline network passes through many areas, including the Rasah area. Among the areas under the Rasah Parliament that are involved is Seremban 2. Seremban 2 is one of the fastest-developing areas with a high population density in Negeri Sembilan.

Seremban 2 also has many commercial centres, supermarkets and schools. Many housing estates are located within five kilometres of the said gas pipeline network, and residents are worried about their safety should any disaster occur, such as a gas pipe leak, fire or explosion.

On 2 November 2025, which was seven months after the Putra Heights incident, an engagement session involving residents from five housing estates around Seremban 2 was held, and many residents attended and raised many questions related to safety to PETRONAS. I myself attended this engagement session, and the engagement ran smoothly. I request that the government provide explanations or answers on the following matters:

(i) what is the total length of this gas pipeline network?;

Tuan Cha Kee ChinDAP · PHRasahEN

(ii) for the area under the Rasah Parliament, what is the length of the gas pipeline involved and please provide the names of the housing estates along its route?;

(iii) please state what steps have been and will be taken by PETRONAS and the relevant agencies to ensure the safety assurance of this gas pipeline network?;

(iv) what is the approach of PETRONAS and the agencies involved in handling any direct complaints from residents?;

(v) given that there are many schools around this gas pipeline network, including primary schools, what steps will be taken if an undesirable incident occurs?; and

(vi) will PETRONAS continue the engagement sessions with residents given that many residents were still not invited to the session on 2 November 2025?

I request the Honourable Deputy Minister who is present this afternoon to provide answers to these questions. Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I ask the Honourable Minister to respond.

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform) · Ipoh BaratEN

Thank you, Madam Deputy Speaker. Is that all right? Many questions have been raised by the Honourable Member for Rasah. For the information of the Honourable Member, the entire gas pipeline network owned by PETRONAS Gas Berhad (PGB) is 2,675 kilometres long. For the gas pipeline network under the Rasah Parliamentary constituency P130, the length of the gas pipeline is only 35 kilometres, starting from Seremban Jaya to Labu. The list of housing estates along the gas pipeline network will be provided directly to the Honourable Member.

Regarding the safety of the gas pipeline network, PGB maintains and operates the gas pipelines based on the ASME safety code, American Society of Mechanical Engineers. Is that right? [Asking an officer] Okay. B31.8 as stipulated in the Permit to Operate (PTO) issued by the Department of Occupational Safety and Health Malaysia (JKKP). These activities include aerial and ground surveillance, online inspection, station inspection, slope monitoring and valve maintenance.

Next, PGB is always concerned about any complaints submitted or to be submitted by residents of an area regarding the PGB gas pipeline network. In this regard, PGB has taken proactive steps to make it easier for residents to convey any feedback or complaints related to the safety of the gas pipeline network throughout Malaysia.

(i) the QR code scan provided on every warning sign along the gas pipeline network. Residents can scan this code to send complaints directly to PGB; and

(ii) a toll-free line, toll-free 24 hours, 24 jam, where PGB provides a toll-free line that operates at all times to receive any complaints. The numbers of this toll-free line that can be contacted at any time are 1-800-88-8757 or 07-9353077 or 3078.

These measures will ensure that complaints can be conveyed as quickly as possible and handled effectively.

In addition, regarding PGB's readiness to handle any undesirable incident, awareness programmes and periodic training have been held since the early establishment of the PGB regional office according to the annual schedule set, to ensure that staff and the community are always alert and prepared. Over the last three years, PGB has carried out around 80 awareness and training activities involving joint efforts of PGB staff, the community and the relevant authorities. PGB has also enhanced its awareness programme by introducing the specific Awareness n Action initiative for densely populated areas.

This programme comprises two parts, namely awareness engagement, which is the sharing of information on safety as well as operational maintenance through dialogue sessions. This programme involves, one, providing emergency action information to residents around the gas pipeline network. Awareness session

(awareness session) was held on 2 November 2025 in the Rimbun area, which covered an introduction to the risks related to gas pipelines, basic safety measures, and emergency action procedures, namely what must be done if a leak and incident occur. The communication channels for reporting incidents are the QR code scan and the toll-free line 1-800-88-8757 as stated just now.

Second, the Emergency Response Exercise (ERE) with local authorities, security agencies and residents' security to ensure preparedness, containment and the safety of the community are always assured. This emergency exercise aims to test the effectiveness of the response plan, train the community, including schools and security agencies, so that they know the correct actions during an incident, and ensure that coordination between PGB, local authorities and the community runs smoothly. PGB plans to carry out three more emergency exercises this year and several exercises have already been scheduled for next year. As for the gas pipeline in Seremban, the emergency exercise was carried out on 15 November 2025 in the Rimbun area.

Finally, regarding the engagement sessions with residents, a total of 14 community sessions have been held so far involving affected residents and communities living along the right of way of the PGB gas pipeline. For the session held on 2 November in Rimbun, a total of 80 residents from the areas of Taman Bukit Kepayan, Rimbun Vista, Rimbun Alam, Rimbun Impian and Harmoni Utama attended the session.

PGB will ensure that more people come and efforts are made to increase attendance at engagement sessions in future for residents along the PGB gas pipeline network. Thank you. I hope there is nothing...

hadapan bagi penduduk sepanjang jajaran paip gas PGB. Terima kasih. Harap tiada apa...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite the Honourable Member for Rasah to put his questions.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Mr Speaker.

Thank you to the Honourable Deputy Minister for the rather comprehensive and thorough answer that was given. But although it was thorough, I have additional questions too.

[Laughter] So, I take note of the series of meetings or engagement sessions with residents. The campaign is indeed necessary and very important after the 1 April incident at Putra Heights, and I appreciate the two sessions, on 2 November and 15 November.

However, I want to say, can such sessions be held more regularly, because if we look at the Rasah Parliament, only five housing estates were invited that day. Many other housing estates were not invited. This is my focus on the Rasah Parliament.

So, can I propose that they be held on a regular basis?

Perhaps they should not be held just for those five housing estates. Those five housing estates are already okay.

Anyone who wants to come can come. What about many other places? Okay, I have been informed of Seremban 3, which is far from the venue that day.

And I also seek the government's view. Is there any possibility of fencing the gas pipeline so that people cannot climb over it?

So, was it not fenced all this time because of any reason, cost or such? Not much. Thank you. Before the Deputy Speaker stops me.

[Laughter]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I ask the Honourable Minister to respond.

In answering the awareness session, PGB remains committed to ensuring that the safety level of the gas piping system throughout Malaysia is in a safe and good condition.

The Rasah area is among the areas that are constantly monitored because its Member of Parliament is very astute, according to PGB.

For this purpose, PGB will continue the safety training measures as in PGB's operational safety plan. Communication with the local community will also continue to ensure a high level of awareness. PGB will also strengthen cooperation with the PDRM (Royal Malaysia Police), bomba (fire and rescue department) and local security agencies. This is an existing procedure and is carried out in PGB operations throughout Peninsular Malaysia.

For the second question, namely fencing the ROW to prevent unauthorised entry into the gas pipeline area. Fencing the right of way for the gas piping system may cause several safety issues in operations. The main problems include:

(i) obstructing access to maintenance operations, especially in urgent repair work and routine inspections;

(ii) creating additional safety risks during emergencies because the fence will block entry and exit routes for emergency crews; and

(iii) violating industry standards based on ASME B31.8, which emphasises that the ROW must remain free of obstruction and be easily accessible to gas piping operations officers.

Thank you. Anything else?

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Application for CitizenshipSpecial Chamber

Tuan Cha Kee ChinDAP · PHRasahEN

Yes, thank you, Mr Speaker.

This is the Ministry of Home Affairs. On this afternoon, allow me to raise an issue concerning citizenship applications.

First of all, I would like to record my appreciation to the Malaysia MADANI Government, especially the Ministry of Home Affairs, which has given proper consideration to every application to obtain Malaysian citizenship status.

I am well aware that not all applicants will succeed in their applications because applicants must fulfil the stipulated conditions.

Compliance with conditions is indeed important to prevent those who are not eligible from also receiving citizenship status. On this occasion, I would like to obtain the government's comments or explanations regarding several of the following questions. The first is, please state the latest statistics on the total number of applications by category that have been approved under the Malaysia MADANI Federal Government. That is the first.

Second, please state the number of applicants from the Rasah Parliament who have been granted approval by the Malaysia MADANI Federal Government by category over the past three years.

And third, below are several names for which I have assisted them and...

[Interjection] Must read, yes. Okay. I ask the Honourable Deputy Minister to state the comments or reasons why the following applications still have not been approved.

(a) Kaidal bin Abdul Rahman;

(b) Liew Kim Fook;

(c) Yong Anh;

(d) Khoo Sheteng;

(e) Ong Fongsavanh;

(f) Erica Chong Han Yi;

(g) Woh Hao Hang;

(h) Woh Tzen Ching; and

(i) Davina Kishon.

Tuan Cha Kee ChinDAP · PHRasahEN

I request the answer from the Honourable Deputy Minister to the questions stated above. Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I ask the Honourable Minister to respond.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Bismillahirrahmanirrahim. Mr Speaker, Honourable Member for Rasah. For the information of the Honourable Member, the Ministry of Home Affairs has set a target to issue 20,000 decisions on citizenship applications for 2025. That is our target and KPI. As of 7 November 2025, a total of 15,420 citizenship applications have been considered and decisions issued by the ministry, whether approved or rejected. Of that total, 62 per cent, namely 9,556 applications, have been approved out of the 15,420 earlier.

Based on the breakdown by category under Part III of the Federal Constitution, a total of 3,883 applications have been approved under Article 15A, namely for children under the age of 21 in special circumstances. Next, 2,906 applications were approved under Article 15(2), which involves children of one of the Malaysian citizens.

Meanwhile, 1,979 applications were approved under Article 19(1), namely by naturalisation by foreign nationals. In addition, 788 applications were approved under Article 30(1), which involves certification of citizenship on an individual basis.

Regarding the Honourable Member's question on the specific number of approvals in the Honourable Member's Parliament, Rasah Parliament, the National Registration Department (JPN) does not record citizenship applications based on Parliamentary boundaries, Honourable Member. Instead, it is recorded according to the application receiving office. We follow districts, not Parliamentary areas. In this regard, the Rasah Parliamentary area is under the administration of the JPN Seremban Office, Negeri Sembilan. Therefore, based on the official JPN records, the total number of citizenship applications that have been approved and issued citizenship certificates by JPN Seremban for the period 2021 to 2025 is 152 applications.

Honourable Member, regarding the list of applicants that the Honourable Member mentioned just now, I would like to explain that the citizenship consideration process is carried out with great care, very cautiously, and we always comply with the regulations based on the provisions of law and the regulations in force. It is not based on officers' discretion, but on the rules and laws that are indeed provided for, most of which were approved by this august House.

Therefore, it must be emphasised that the granting of any citizenship to an individual of non-citizen status is not a right that can be claimed by any party. Rather, it is the highest award, which the Honourable Member is aware of, and is the exclusive right of the Federal Government. This is as stipulated in Part III of the Federal Constitution as well as the Citizenship Rules 1964. Therefore, it is not

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

offered or granted arbitrarily, but based on the evidence and eligibility submitted by the applicant and in compliance with the conditions as we know.

Accordingly, if there are statements saying "not yet approved", we need to understand them in the correct context because approval is not an automatic obligation of the government to the applicant. Not automatic. Instead, all citizenship applications are subject to assessment based on the conditions provided by the Federal Constitution and the law. This is very clear and all of us know it.

This means that for every application, we need to go through a review process and thorough assessment, including verification of documents, marital status, adoption, legitimacy of children, and compliance with the relevant immigration regulations.

Therefore, the processing time for each application varies. It depends on the facts of the case and the documents required. There is no standard. This means each investigation may take one week, two weeks, or none.

It depends on the cases submitted. And in any case, the ministry always strives to expedite the consideration process for applicants who submit complete documents. We expedite, but the decision I mentioned earlier does not mean approval. Whether approved or failed depends on the evidence and conditions stipulated.

However, I want to emphasise that this process must be carried out carefully and prudently to ensure that only applicants who truly comply with all the stipulated conditions and criteria are considered for approval. In this regard, the ministry also gives priority to resolving the backlog cases, Honourable Member, which are many and still under review, while we continue to verify issues relating to the handling of new applications. This is being done.

So Honourable Member, based on the records check at the ministry, the nine applications the Honourable Member mentioned are as follows, Honourable Member. Of that total, seven applications were submitted under Article 15A of the Federal Constitution, namely applications for children under the age of 21 in special circumstances. The applications are:

(i) Yong Anh;

(ii) Khoo Sheteng;

(iii) Ong Fongsavanh;

(iv) Erica Chong Han Yi; I apologise, Honourable Member, if I mispronounced it.

(v) Woh Hao Hang;

(vi) Woh Tzen Ching; and

(vii) Davina Kishon.

Honourable Member, all six of the above applications, apart from Davina Kishon, are still under review and document verification, six.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Tadi Yang Berhormat sebut tujuh. Ada enam tadi kecuali Davina Kishon masih dalam proses untuk penelitian dan verifikasi dokumen-dokumen yang dikemukakan.

Manakala, bagi permohonan atas nama Davina Kishon, keputusan telah pun dikeluarkan pada 10 Oktober 2025 dan keputusannya ditolak. Dan telah pun dikeluarkan pada 10 Oktober 2025. Kenapa ditolak? Kerana pemohon ini, subjek ini dilahirkan di luar Persekutuan iaitu di luar negaralah dan memegang kewarganegaraan Ukraine. Ini memang melanggar syarat-syarat kitalah.

Seterusnya Yang Berhormat, permohonan atas nama Kaidal bin Abdul Rahman telah dikemukakan di bawah Perkara 19(1) Perlembagaan Persekutuan bagi naturalisasi dan masih dalam proses semakan lanjut oleh kementerian memandangkan kategori ini memerlukan penelitian terhadap bukti permastautin.

Ha, tergeliat lidah saya sebut. Tahap pengetahuan bahasa Malaysia serta rekod kelakuan baik, pemohon melalui tapisan keselamatan dengan pihak Polis Diraja Malaysia. Ini sangat teliti dan memerlukan perhatian khusus termasuklah tapisan keselamatan yang begitu teliti oleh pihak Royal Malaysia Police.

Sementara itu, permohonan atas nama Liew Kim Fook yang juga dikemukakan di bawah perkara 19(1) telah dibatalkan kerana tidak memenuhi syarat-syarat kelayakan. Kenapa dibatalkan? Saya boleh kongsi dengan Yang Berhormat selepas ini. Terima kasih, Yang Berhormat.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Saya persilakan Yang Berhormat Rasah untuk mengajukan pertanyaan.

Tuan Cha Kee ChinDAP · PHRasahEN

Terima kasih kepada Mr Speaker. Terima kasih kepada Yang Berhormat Timbalan Menteri yang memberikan — bagi saya jawapan yang — huraian yang komprehensif yang menyeluruh terutamanya berkenaan dengan sembilan kes yang saya sebutkan tadi. Memang betul, saya cukup faham, bukan kata mohon mesti lulus. Bagi saya yang paling mustahak adalah kerajaan mempertimbangkan dengan teliti semua dokumen sebagai keterangan dan juga sama ada ia patuhi isyarat atau sebaliknya.

Tuan Cha Kee ChinDAP · PHRasahEN

Macam yang ada yang lahir di luar dan sebagainya, memang saya — saya apalah. Tak ada masalah janji ada jawapan yang sepatutnya dan mungkin kalau dia nak buat rayuan tu, itu proses yang kedua.

Soalan tambahan saya Yang Berhormat Timbalan Menteri. Kita tahu banyak kes macam tadi, (c) ke (i) itu, dia banyak kepada 15A. Banyak permohonan 15A. Dia 15A, untuk mereka yang berusia 21 tahun ke atas. Okey, saya nak tanya kepada Yang Berhormat Timbalan Menteri. Seandainya pemohon, subjek tu, dia sekarang ni mungkin 19, 20. Dekat-dekat nak 21. Sebelum mendapat keputusan, masih dalam peringkat permohonan, penelitian, dia dah mencecah 21. Sama ada, dia layak tak dalam ni ataupun dia kena mohon balik untuk kategori lain sebab dia dah mencecah 21. Sebab 15A itu untuk sesiapa yang berusia 21 tahun ke atas.

Okey, dan juga untuk mereka yang terlibat daripada bahagian kesihatan dan pendidikan. Ada tak pihak kementerian boleh keluarkan apa-apa surat sementara yang katakan bahawa supaya persekolahan mereka tak terjejas

Tuan Cha Kee ChinDAP · PHRasahEN

ataupun boleh mendapat apa-apa kemudahan kesihatan di agensi kerajaan?

Terima kasih.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Minta Yang Berhormat Menteri untuk menjawab.

Yang Berhormat, saya jawab berkaitan dengan pendidikan, persekolahan dan kesihatan. Itu di luar bidang kuasa Ministry of Home Affairs. Walau bagaimanapun, kita sentiasa melakukan kolaborasi dan perbincangan ke kementerian berkaitan.

Yang Berhormat, memang kerajaan sangat prihatin terhadap isu melibatkan permohonan di bawah perkara 15A. Sebagaimana Yang Berhormat sebutkan tadi, itu bagi kategori anak angkat, anak jagaan, anak tak sah taraf yang meningkat usia tapi masih belum memiliki warganegara. Itu lebih kurang yang dimaksudkan oleh Yang Berhormat.

Lantaran itu, kementerian telah pun melaksanakan beberapa penambahbaikan dasar bagi memastikan kumpulan ini tidak terus terpinggir daripada akses dokumentasi. Semua ini kita buat hasil libat urus, mendapat pandangan-pandangan daripada pihak termasuklah daripada Ahli Yang Berhormat dan juga pandangan-pandangan dikemukakan dalam Dewan Negara (Senate) dan Dewan Rakyat (House of Representatives).

Jadi, antara penambahbaikan tersebut ialah membenarkan individu berumur 12 tahun ke atas yang memiliki sijil pengangkatan atau sijil lahir Malaysia di bawah kategori-kategori tersebut untuk memohon Temporary Resident Identity Card (MyKAS). Namun, tertakluk kepada syarat-syarat di peraturan 5(3)(c)(ii) Peraturan-Peraturan Pendaftaran Negara 1990. Setelah memiliki MyKAS dan memenuhi syarat yang ditetapkan, individu berkenaan boleh memohon taraf Permanent Resident (MyPR) daripada Jabatan Pendaftaran Negara (JPN) dan pemegang MyPR yang layak kemudian boleh mengemukakan permohonan kewarganegaraan secara naturalisasi di bawah Perkara 19, Perlembagaan Persekutuan yang saya jelaskan tadi.

Namun demikian Yang Berhormat, walaupun pemohon boleh dikemukakan oleh individu yang layak, ia kekal bukan jaminan bahawa permohonan tersebut akan diluluskan kerana saya sebutkan tadi ini anugerah tertinggi dan hak kerajaan, ia tetap tertakluk kepada peraturan-peraturan dan undang-undang yang sangat teliti dan begitu ketatlah. Hanya yang layak dan mematuhi saja dapat kita penuhi. Terima kasih Yang Berhormat.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Building a Recreation Area on MADA C-2 Kerpan Reserve Land in the Jerlun Parliamentary ConstituencySpecial Chamber

Bismillahirrahmanirrahim.

Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, saya mohon untuk membincangkan isu membina kawasan rekreasi di atas tanah rizab MADA C-2 Kerpan dalam Parlimen Jerlun.

MADA C-2 Kerpan mempunyai tanah rizab di tebing sungai yang bersebelahan dengan jalan utama dari Simpang Empat Kerpan ke Megat Dewa.

Di sepanjang tanah rizab tersebut, terdapat bangunan kedai hardware yang dibina

secara berperingkat-peringkat. Penduduk setempat pula memanfaatkan tanah tersebut dengan tanaman kontan seperti pisang, sayur-sayuran dan sebagainya.

Selain itu, tanah tersebut ditumbuhi rumput lalang yang tidak diselenggarakan dengan baik oleh pihak berwajib. Rumput lalang yang dibiarkan itu menjadi semak samun. Ia mencacatkan mata memandang, bahkan berisiko menjadi habitat binatang berbisa yang boleh membahayakan penduduk di sekitarnya.

Tanah rizab tersebut dianggarkan 800 meter panjang dan tiga meter lebar.

Kedudukan tanah rizab ini yang memanjang di tepi sungai dapat menarik perhatian pengunjung jika dibangunkan kawasan rekreasi. Secara tidak langsung, ia akan dapat menarik golongan remaja atau golongan muda untuk melakukan aktiviti riadah di situ memandangkan — manakala penduduk setempat pula boleh mengembangkan perniagaan melalui gerai jualan makanan, minuman pada setiap masa.

Selain itu, pihak sekolah dapat menjadikan kawasan rekreasi tersebut sebagai aktiviti sukan di lapangan. Manakala, jabatan Kerajaan seperti MADA, JPS, NGO atau persatuan sekolah, persatuan sukan boleh menganjurkan sukan sungai bersebelahan kawasan rekreasi di lokasi tersebut. Sebagai contoh, Kerajaan Negeri Perlis telah mewujudkan Taman Rekreasi Pengkalan Asam

(Denai Larian) yang terletak berhampiran dengan Sungai Perlis. Denai ini sering digunakan untuk aktiviti larian oleh penduduk setempat.

Begitu juga, Taman Rekreasi Sungai Batu Pahat, adalah tempat popular untuk berkelah dan bersantai di Sungai Batu Pahat. Selain itu, Taman Rekreasi Tasik Melati berada di kawasan tanah gambut dan merupakan lokasi menarik untuk bersiar-siar oleh pengunjung luar mahupun penduduk tempatan.

Oleh itu, saya memohon agar kerajaan meluluskan peruntukan untuk membina kawasan rekreasi di atas tanah rizab MADA C-2 Kerpan dalam Parlimen Jerlun. Sekian, terima kasih Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Minta Yang Berhormat menteri untuk menjawab.

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

Mr Speaker, saya ucap terima kasih kepada Yang Berhormat Jerlun atas keprihatinan beliau terhadap kesejahteraan masyarakat terutama sekali di kawasan Kerpan ini dan untuk pengetahuan, walaupun kita sentiasa nyatakan bahawa kita tentu sekali prihatin dan ingin sentiasa membantu semua pihak dalam kita membudayakan sukan termasuk dengan membangunkan atau menaik taraf kemudahan-kemudahan yang ada berdasarkan kepada keperluan sesuatu tempat.

Namun, kita harus ambil kira bahawa apa-apa sekalipun perancangan kita perlu lihat pada satu bidang kuasa. Yang kedua adalah perancangan yang mengikut apa yang telah pun digariskan. Jadi, untuk makluman Ahli Yang Berhormat, yang pertama saya harus maklumkan bahawa selain daripada di KBS (Ministry of Youth and Sports), sebenarnya apa-apa sekalipun, permohonan untuk projek baru perlu melalui Majlis Mesyuarat Kerajaan Negeri. Erti kata lain, untuk bangunkan satu-satu kawasan rekreasi atau fasiliti sukan, itu kita perlu kerjasama dengan kerajaan

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

negeri, perlu dapatkan kelulusan kerajaan negeri untuk kelulusan dan persetujuan daripada mereka dan permohonan itu harus dinyatakan oleh kerajaan negeri sebaik-baiknya. Tidak juga bermaksud kita menghalang.

Yang kedua, kita juga kena tahu bahawa bila kita bangunkan mana-mana fasiliti sukan, ia nya menelan kos penyelenggaraan juga. Kalau kita lihat seperti yang dibangkitkan oleh Yang Berhormat, masalah utama kawasan tersebut sebenarnya adalah masalah yang berkait dengan contohnya penyelenggaraan yang agak tertinggal sehingga jadi semak-samun dan rumput lalang dan jadi habitat untuk haiwan liar kalau dibiarkan berlama-lamaan. Sebab itu, perkara ini sebenarnya akan sentiasa berulang jika tidak ada perancangan yang baik. Kalau kita bangunkan mana-mana fasiliti, kita harus pastikan bahawa kita sudah rancang bukan hanya cara nak bangunkan, bukan hanya perbelanjaan atau peruntukan, sebaliknya juga apa yang nak dibuat selepas ia dibangunkan termasuk penyelenggaraan.

Jadi, saya harap ini boleh dibincangkan dengan Kerajaan Negeri Kedah termasuk kalau yang dibangkitkan juga oleh Yang Berhormat tadi. Contohnya ada beberapa fasiliti yang dibangunkan oleh negeri Perlis. Itu dibangunkan dengan kerjasama kerajaan negeri. Kita juga ada buat beberapa projek kecil untuk merancakkan lagi aktiviti sukan.

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

Memang kita adakan kerjasama dengan kerajaan negeri dan kedua-dua kerajaan negeri itu sama ada Perlis atau Kedah ditadbir oleh bawah yang kita panggil kadang-kadang SG4. Jadi, kita tak ada diskriminasi, kita memang sentiasa buat. Jadi, tak ada halangan pun untuk kita bangunkan bersama dengan kerajaan negeri Kedah namun kita tekankan bahawa perlu ada perancangan bersama supaya kita boleh membuat dengan baik.

Kedua, kita juga harus ingat bahawa apa-apa sekalipun permohonan projek perlu ikut Garis Panduan Penyediaan Thirteenth Malaysia Plan dan Permohonan Projek Pembangunan Tahun 2026-2030. Urusan tanah ini juga perlu didaftarkan tanah itu atas tanah Pesuruhjaya Tanah Persekutuan (PTP) walaupun tanah tersebut adalah di bawah agensi Persekutuan MADA tapi harus diingatkan bahawa tanah tersebut dipajak pada MADA untuk pembangunan di lembaga tersebut.

Jadi, tanggungjawabnya itu sebenarnya di bawah MADA. Maka, kalau boleh saya sarankan kepada Yang Berhormat sebagai Ahli Parlimen di kawasan tersebut ia nya tidak hanya kepada kita walaupun kita faham tujuannya adalah nak bangunkan kawasan rekreasi untuk diadakan aktiviti sukan, namun saya rasa salah faham ini perlu kita hentikan. Jangan tengok kalau aktiviti atau apa, fasiliti sukan terus balik ke Ministry of Youth and Sports.

Kita ada banyak lapis sebelum sampai pada kita terutama sekali dalam konteks yang ini MADA sebagai pihak yang bertanggungjawab harus ambil apa, harus jadi orang kata penerima permohonan yang pertama. Begitu juga di banyak kawasan-kawasan lain, kalau kita tengok pun kawasan di bawah FELDA, FELCRA dan sebagainya memang kita sarankan untuk dimohon terhadap agensi tersebut terlebih dahulu kerana mereka adalah pihak yang bertanggungjawab ke atas tanah tersebut dan mereka juga adalah pihak yang mengendali dan menyelenggara tanah-tanah, aset-aset milik mereka sendiri.

Tuan Adam Adli Abd HalimPKR · PHDeputy Minister of Youth and Sports · Hang Tuah JayaEN

Apa sekalipun, jika kita boleh bincangkan bersama-sama, yang pertama yang tadi saya sebut permohonan biar kita lalu kerajaan negeri supaya mereka boleh adakan satu wish list bersama yang lebih mudah untuk kita rujuk. Yang kedua, kita boleh bincang — pihak Yang Berhormat boleh mungkin boleh kemukakan masalah ini kepada pihak MADA sebagai pihak yang bertanggungjawab ke atas aset tersebut. Dan ketiga, kita juga harap kita boleh tekankan tanggungjawab ini harus dilihat juga dalam konteks yang lain termasuk bukan nak salahkan sesiapa tapi contohnya, masalah ini boleh ditimbulkan juga kepada KPKT (Ministry of Housing and Local Government) kerana ini melibatkan kawasan-kawasan kediaman juga.

Jadi semua pihak boleh bekerjasama dan barulah Ministry of Youth and Sports kita masuk. Tapi untuk Jerlun, kita tahu kita ada kompleks sukan di Jerlun.

Itu sudah pun dibangunkan di situ. Jadi, mungkin di masa hadapan kita boleh bangunkan banyak lagi.

Cuma dalam perbincangan soal tanah ini yang tiga meter lapan ratus jadi saya anggap ia satu tanah yang panjang bukannya tanah yang orang kata meluas dari sudut persegi tapi panjang itu mungkin nak diadakan track dan laluan rekreasi supaya ada orang boleh buat aktiviti ekonomi dan sebagainya dan saya ini bukannya di bawah — kita tak, saya belum pernah tengok lagi projek sebegini diadakan di bawah Ministry of Youth and Sports sebagai kementerian utama sebaliknya kita akan adakan kerjasama. Contoh KPKT, bangunan apa ataupun KKDW (Ministry of Women, Family and Community Development) dan sebagainya kalau boleh masuk campur dan KBS boleh main peranan juga selepas ada persetujuan. Terima kasih.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Saya persilakan Yang Berhormat Jerlun untuk mengajukan pertanyaan.

Terima kasih, Madam Speaker. Terima kasih, Yang Berhormat Menteri. Saya sedar dan saya faham bahawa tanah ini adalah milik tanah di bawah MADA. MADA adalah agensi Persekutuan dan saya kira MADA ada potensi untuk membangunkan program ini tetapi faktor yang menjadi isunya adalah kewangan.

Sebab saya sendiri telah berurusan dengan MADA C-2 Kerpan, mereka turun bersama dengan saya untuk meninjau tempat yang dicadangkan dan tiada bantahan jika dibenarkan oleh pihak berkuasa. Jadi, saya mohon penjelasan daripada Yang Berhormat Menteri, bolehkah Yang Berhormat Menteri berasaskan permohonan ini agar mengeluarkan satu surat ataupun apa jawapan bertulis hasil perbincangan hari ini supaya MADA tidak ada halangan dan pihak saya boleh ketengahkan dengan kerjasama kerajaan negeri.

Jadi, kalau itu ada hitam putihnya daripada pihak Yang Berhormat Timbalan Menteri, Yang Berhormat Menteri ataupun KBS itu sendiri, jadi pihak kami boleh mengajukan kepada pihak yang berautoriti. Sekian.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Saya persilakan Yang Berhormat Menteri untuk menjawab.

Tuan Adam Adli Abd HalimPKR · PHHang Tuah JayaEN

Terima kasih Madam Speaker. Saya ucap terima kasih atas langkah awal telah diambil. Oleh demikian, kita cadangkan begini. Yang pertama, kerana kuasa di bawah Ministry of Youth and Sports, kapasiti kita amat terhad. Kalaupun ada satu kawasan yang telah pun dibenarkan oleh majlis — oleh pihak berkuasa tempatan atau mana-mana pemilik tanah pun kita harus rujuk juga kepada kebenaran di bawah Pesuruhjaya Tanah Persekutuan (PTP). Jadi, proses itu masih panjang.

Tuan Adam Adli Abd HalimPKR · PHHang Tuah JayaEN

Yang kedua, kita sarankan supaya — berdasarkan pada yang demikian, lebih baik kalau saya hantar dahulu Pegawai Belia dan Sukan Daerah untuk hadir, tinjau dan lihat di mana Ministry of Youth and Sports boleh ikut serta. Macam saya sebut tadi, kalau dikira kawasan tersebut kalau ikut atas maklumat yang disediakan oleh Yang Berhormat, 800 meter kali tiga meter panjang, tiga meter itu tak panjang sangat. Ini lebih kurang tiga meter.

[Sambil membuat isyarat tangan] 800 meter itu sangat panjanglah. Itu hampir-hampir satu kilometer, 200 meter habis satu kilometer.

Jadi, kita perlu lihat apa yang boleh dibuat dengan bentuk geografi yang demikian. Mungkin kawasan tersebut perlu dibangunkan bukan hanya terhad kepada yang disebut sebagai fasiliti atau kemudahan bersifat kemudahan sukan tapi sebaliknya kemudahan rekreasi yang meliputi banyak aspek lain termasuk yang di bawah tanggungjawab pihak-pihak lain.

Tapi saya merasa kita boleh mulakan dengan mungkin kita akan mohon Pegawai Belia dan Sukan Daerah untuk tinjau, lihat dan sebaiknya diadakan perbincangan yang lebih, lebih orang kata apa perbincangan yang lebih terbuka dengan setiap wakil dari agensi-agensi yang berlainan agar ini boleh dirancang bersama. Terima kasih Yang Berhormat.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Caning Punishment for Student Offences at Morning AssemblySpecial Chamber

Bismillahirrahmanirrahim.

Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, Yang Berhormat Timbalan Menteri, saya mohon untuk membincangkan isu hukuman merotan kesalahan pelajar di perhimpunan pagi. Mutakhir ini kesalahan disiplin pelajar semakin membimbangkan negara khususnya Ministry of Education Malaysia, pihak sekolah dan waris pelajar itu sendiri.

Para pelajar tidak segan silu melakukan kesalahan berat seperti jenayah bunuh, rogol, pergaduhan dan buli secara terbuka tanpa berselindung lagi.

Media arus perdana kerap kali menyiarkan berita-berita tentang kejadian tersebut. Bermula dengan kes buli yang melibatkan Zara Qairina binti Mahathir pada 16 Julai 2025 di sebuah sekolah berasrama di Papar, Sabah berakhir dengan kematian keesokannya. Selepas itu pada 26 Julai 2025, kes buli di MRSM Melaka, enam pelajar Tingkatan 5 digantung sekolah dan terkini pada 14 Oktober 2025, seorang pelajar lelaki berusia 14 tahun menikam hingga mati seorang pelajar perempuan berusia 16 tahun di sebuah sekolah menengah di Bandar Utama, Petaling Jaya.

Hakikatnya, kes buli di sekolah di Malaysia masih berlaku. Statistik menunjukkan peningkatan jumlah kes, terutamanya di sekolah menengah.

Ministry of Education Malaysia telah mencatatkan 7,681 kes buli pada tahun 2024, naik daripada 6,528 kes pada tahun 2023.

Ketika menjawab soalan Ahli Parlimen Jerlun secara bertulis mengenai sama ada Ministry of Education Malaysia bersedia membenarkan waris pelajar yang dibuli merotan pembuli dalam kalangan pelajar pada perhimpunan pagi di sekolah. Yang Berhormat Menteri menyatakan bahawa Ministry of Education Malaysia berpandangan bahawa pendekatan yang lebih berkesan

In dealing with any disciplinary issue involving students, the approach is to strengthen communication between the school and parents, besides ensuring the implementation of discipline in schools that emphasises the building of character and integrity.

Professional Circular (SPI) No. 7/2003 empowers teachers to cane students, as contained in the Education Regulations (School Discipline) 1959, under the Education Ordinance 1957.

Referring to Regulation 5, caning is permitted only for male students and is prohibited for female students by the head teacher, including the principal, while Regulation 6 allows the head teacher to delegate his power to any teacher, particularly the discipline teacher, to cane students.

Referring to paragraph 4 of SPI No. 7/2003, caning in public, whether at the assembly or in classrooms where teaching and learning are taking place, is prohibited. Therefore, I urge the government to review SPI No. 7/2003 by allowing caning for student misconduct to be carried out at the morning assembly as one of the mechanisms to educate students so that they do not repeat such offences, and as a lesson to other students not to emulate such bad behaviour. That is all, thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I ask the Honourable Minister to respond.

Tuan Wong Kah WohDAP · PHDeputy Minister of Education · TaipingEN

Thank you, Mr Speaker. Thank you to the Honourable Jerlun for the motion that has been raised. The Ministry of Education Malaysia (KPM) gives serious attention to the implementation of caning in schools by providing proper procedures and guidelines so that the punishment is educational in nature and creates awareness not to commit such offences. KPM takes note of the public concern over incidents that have occurred previously, and the approach taken by KPM must be based on the regulations currently in force and existing, as well as educational principles that prioritise the safety, protection, character development of students and also education.

For the information of the Honourable Members, the implementation of caning in the school context is subject to the Education Regulations (School Discipline) 1959. This official document stipulates that caning may only be imposed on male students and may only be carried out by the principal or head teacher or any teacher specifically given the power. The method of implementing this punishment has been detailed through SPI No. 7/2003: Power of Teachers to Cane Students, which clearly stipulates that caning may not be imposed on female students and may not be carried out in front of the public,

Tuan Wong Kah WohDAP · PHDeputy Minister of Education · TaipingEN

including at the school morning assembly or any open area that invites the attention of other students.

This circular also stipulates that any caning must be carried out in a closed, controlled and dignified manner, taking into account the safety and health of the student. The school must also keep complete records of caning, which are confidential. In addition, the approach of carrying out punishment before the public risks affecting the well-being of students. Such punishment has not proven to be an effective preventive mechanism in the long term. At the same time, physical punishment in front of peers may also increase the risk of anxiety, depression, low self-esteem and aggressive and problematic behaviour in the future.

In the context of our country, the Children's Commissioner of SUHAKAM has consistently stressed that educating through fear or pain has negative effects on the mental, physical and self-esteem development of students. SUHAKAM has also urged that proposals for public caning and humiliating physical punishment be reviewed in line with the principles of child protection under the Child Act 2001 [Act 611]. Therefore, for the information of the Honourable Members, in handling or addressing the issue of caning, KPM on the one hand must ensure that discipline is maintained, and on the other hand we must also ensure that the views of SUHAKAM, especially the Children's Commissioner of SUHAKAM, can also be given due attention.

For the information of the Honourable Members, KPM has a clear mechanism through SPI and also guidelines in dealing with student disciplinary misconduct and ensuring the school ecosystem is always in a safe condition. Previously, KPM has mentioned many times the SPI Number 13/2023 on the guidelines for managing sexual misconduct, and SPI Number 12/2013 on the management of bullying misconduct. Both of these guidelines clearly set out the responsibilities and roles of all parties including teachers, school administrators, parents and also the SOP procedures for — in dealing with the issues involved.

We also have SPI Number 8/2011, the guidelines for student safety management. SPI Number 7/2011: Implementation of the SOP 1:3:7 Reporting and Action in Addressing Student Discipline Issues. Earlier we mentioned the Power to Cane Students in SPI Number 7/2003, and the Implementation of the Safe School Programme, SPI Number 4/2002, as well as the Guidelines on Students' Personal Safety During Physical and Health Education and Co-curricular Activities, SPI Number 9 of 2000. Any amendment to these SPIs or guidelines must take into account the existing legal provisions, the principle of student protection, current developments and the need to ensure the school environment remains safe and conducive.

For the information of the Honourable Members, as a dynamic approach — this is new, yes. KPM has improved action against students by emphasising the implementation of psycho-educational activities throughout the period of school suspension as a rehabilitation intervention. So, we have many actions regarding disciplinary measures that we can take against our children

Tuan Wong Kah WohDAP · PHDeputy Minister of Education · TaipingEN

such as warnings, written warnings, verbal warnings, expulsion, fines, school suspension, detention classes, and caning, and so on.

So, when we handle the intervention during school suspension, KPM has introduced the Bangkit Bermaruah intervention programme, which is a community service programme and also a student character development programme. This programme will be implemented starting in 2026, next year. The programme is carried out in cooperation with schools, the District Education Office (PBD) and related agencies. It aims to give students a second chance to build a sense of responsibility and self-discipline through active involvement in activities that benefit the students concerned.

For example, the involvement of students in community activities such as gotong-royong and so on in the community and at home, such as staying with parents within a set time for the purpose of guidance and also for the purpose of educating these children. And in addition, this approach also creates awareness and remorse among students who have committed disciplinary misconduct, and this year the programme has been implemented on a pilot basis in Kuala Lumpur and also Putrajaya.

KPM is confident that the Bangkit Bermaruah intervention programme can guide students towards positive change by emphasising prevention, rehabilitation and character building. This approach gives students a second chance to improve themselves and produce a generation that is disciplined and also responsible. Thank you, Madam Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite the Honourable Jerlun to ask his question.

Thank you, Mr Speaker. Thank you, Honourable Minister. It seems the answer given does not address the issue I raised. The issue I raised is whether the government intends to review Professional Circular Number 7/2003.

Looking at the implementation of caning before this guideline existed. My experience as a student once upon a time, it was not that I was hit, it was not that I was struck. Friends, classmates.

The effect, when it is in front of the public, it creates a feeling of shame.

Promising and admitting that they will not repeat the offence committed.

Thirdly, it gives a lesson to others that if they commit such an offence, they will face caning in front of the public.

So, the issue now, to curb everything that has happened recently and I am confident that the interventions carried out, if a review is not made of the method of implementing this caning, these incidents will continue forever.

So, I see that from the legal aspect, the government has the power to review, looking from several different perspectives in [Unclear] the situation.

So, my earlier question is followed by the second question: does the government intend to appoint authorised officers other than the head teacher, principal or designated discipline teacher, such as retired police or retired military personnel, who may still be young because their service was 21 years and they have already retired. These people are given authority to cane. That is my second question. That is all, thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I ask the Honourable Minister to respond.

Tuan Wong Kah WohDAP · PHTaipingEN

Okay. Thank you, Madam Speaker. Thank you for the supplementary question from the Honourable Jerlun. And if the Honourable Jerlun has examined the answers already given by KPM previously, I believe through the written answer to the Honourable Member and also my answer just now, they are related to the existing guidelines and why KPM is of the view that education — the existing approach is the most suitable for addressing student discipline issues. But at the same time, KPM has also strengthened our efforts in building a safe education ecosystem in addressing student disciplinary issues.

For me and also for KPM, Honourable Member, we must emphasise that caning is not everything. When we look, we hear, many indeed say that we need to bring back caning. But for me, caning has never been abolished. Since 1959 until now, the same guidelines have been used. The 2003 SPI also did not withdraw any power that had been given. So, the same.

From 1959 until today, the proper way of caning, with the swing and the force used, all of these exist, and whether we can implement it on students other than male students, or whether it can be done inside, in front of the public, all the situations are the same as from the past until now. From 1959, the same guidelines; 2003 only clarified what should have been there.

And with what exists, with the existing guidelines we have our procedures, Honourable Member. How the conditions of caning are, in what situations a medical check of the student, where to cane, specifications, the swing of the cane and also the way of caning for the second and third time.

Let me give an example of the student's health. The student must be examined to be in good health before undergoing caning. Where to cane?

On the palm of the hand or on the buttocks covered by clothing.

Specifications. Using a light cane not exceeding 1.5 centimetres in circumference and not exceeding one metre in length. Swing of the cane. It must be with moderate force without raising the hand above the shoulder level of the person carrying out the caning.

Condition of caning. Not more than three times. Method of caning. After administering one stroke, the person carrying it out must lift the cane upwards and not drag it, and it must be carried out in front of two members of school discipline as witnesses in a closed room.

Tuan Wong Kah WohDAP · PHTaipingEN

We have many. All these guidelines are very clear, and I certainly understand when there are representatives of the people or members of the public who think that we need to strengthen them further. But what I have explained is that caning has never been abolished. The existing guidelines we use are the guidelines that have been applied all this time since 1959. And what is important for the information of the Honourable Members, for KPM, caning is one of the disciplinary actions that may be taken and is not everything.

We have actions such as school suspension, expulsion, detention classes, verbal warnings, written warnings and warnings for light disciplinary action. And when we deal with the issues before us, for us, we take seriously what has happened, but at the same time we also want to balance when we say, we hear from another segment of society.

The Children's Commissioner of SUHAKAM, the stance of the Children's Commissioner of SUHAKAM is to abolish caning entirely. So, how do we balance the protection or consideration from the Children's Commissioner of SUHAKAM with what we have here, which is how we also want to protect our teachers so that all such actions are under the existing guidelines. I think this is an important consideration before we discuss any amendments that should be made.

I mentioned earlier. To address this disciplinary issue, we have implemented a new programme, Bangkit Bermaruah. Not only do we suspend the school, a 14-day school suspension does not mean that the child, the student, stays at home. Do nothing, with permission. Just sitting or wandering around. No. What do we want to improve from now? In the past, we gave homework when our children were suspended from school.

Now we want to ensure that, with the cooperation and movement of the PBD and the school, we hold this Bangkit Bermaruah programme, hold community gotong-royong programmes, ask parents and these children to continue to engage in community activities like this. We give guidance to parents to ensure that parents also know how important it is to educate their children and to lead them in the right direction. And this is part of the educational reform efforts that we are implementing.

Earlier there was mention of whether we want to bring in retired officers with authority other than — such as retired police and also military. I think this is something we should not do. Why?

Because for me and also for KPM, let it be the school administrators and parents who know best about our children.

What the needs of the school are — what the needs of each school and that student are, the teachers and also the school administrators play an important role; they know these students and they have — know what is best that can be implemented for our children.

And I believe that — we clearly see when we have issues that have arisen, as the Honourable Jerlun mentioned earlier, from the Zara issue until now. Issues that never stop, we acknowledge that, but what is important is that we work within the framework of law. We work within an environment

Tuan Wong Kah WohDAP · PHTaipingEN

or comply with all the laws and existing guidelines.

And what is also important is that when we talk about caning, there is no need, when we want to carry out caning work, to call in police or retired military officers. We are not intending to carry out flogging. We want caning as a punishment that is permitted under the existing guidelines.

We believe, KPM believes that in these few months there have indeed been cases that occurred. The guidelines have already been strengthened. Programmes have already been implemented to ensure that awareness and education for our children have already been — will be strengthened and also expanded, and that all the programmes implemented are effective.

And I want to conclude with this. Since the beginning of July, many have spoken, argued and debated about the issue of bullying. I also want to draw attention to the fact that the action taken by KPM is not only starting in July.

Tuan Wong Kah WohDAP · PHTaipingEN

We started early, throughout the whole period, and I can say here that in December 2024, from 15 December until 13 January. Within that one month, the Ministry of Education (KPM) implemented a programme, a special programme called the MADANI Leadership Movement: Stop Bullying and Sexual Misconduct for the 2024/2025 session. Before the school session even began last year, we had already launched this movement, the MADANI Leadership Movement: Stop Bullying. All of us, from the Minister, Deputy Ministers, KSU (Secretary-General), Doktor KPPM, all of us went out, down to the State Education Departments (JPN), District Education Offices (PPD) and all levels of schools. We went out, and all 10,000 of them at that time, that is, more than 10,200 schools, held the same programme. There was also one and the same module on how we introduce our children to the need for this anti-bullying awareness.

At the same time, we also emphasised the role of our Character Ambassadors (Duta Sahsiah). Namely, we appointed Character Ambassadors from among peers, children who, if our children do not want to make a report to the teachers, the guidance and counselling teachers, or do not know how to lodge a complaint. So these peers, as Character Ambassadors, can help. And what has been implemented is a sustained effort. A sustained effort, not a reaction or response to what happened recently.

And I hope that we, as representatives of the people, will help in this matter, and we at the KPM level will continue to strengthen the efforts being implemented. At the same time, our side will also ensure that all these programmes, the effectiveness of all these programmes, will be studied and considered before we resume.

Thank you, Madam Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, with that, the Special Chamber sitting today is concluded. The Special Chamber is adjourned today until Tuesday, 18 November 2025, at 2.30 p.m.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

[The Special Chamber was adjourned at 3.42 p.m.]