Dewan Rakyat · 19 November 2025

15th Parliament, session 4, meeting 3 · not final · 664 turns · 53,143 words · official PDF ↗ · Digital Hansard ↗

595 of 664 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting]

Oral QuestionsQuestions

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Bismillahirrahmanirrahim. Assalamualaikum and good morning, Honourable Members. The Sitting this morning begins with oral questions. I invite Dato' Sri Dr. Wee Jeck Seng, the Honourable Member for Tanjong Piai, to proceed.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Thank you, Mr Deputy Speaker. My question is number 1.

Wee Jeck SengMCA · BNTanjung Piai · questionEN

1. Dato' Sri Dr. Wee Jeck Seng [Tanjong Piai] asks the Minister of Agriculture and Food Security to state what steps the ministry is taking to ensure that the jetties of the Malaysian Fisheries Development Authority (LKIM) are managed transparently and inclusively, so that they are not monopolised by certain parties and can continue to be utilised fairly by small fishermen and local enterprises.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister of Agriculture and Food Security, please proceed.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

Mr Speaker, the Ministry of Agriculture and Food Security, through LKIM, plays a role in providing and managing fish landing infrastructure to support the nation's fisheries industry. To date, LKIM has built 48 fisheries complexes or harbours throughout the country, including four complexes in the state of Johor, to provide facilities for fishermen to land their catch. The management and operation of these complexes and harbours are based on the Kaedah-kaedah LKIM (Kompleks Perikanan, Labuhan

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

Perikanan dan Jeti Pendaratan Ikan) 2010, which also stipulates the charge rates imposed. Leasing of premises lots and use of facilities at these complexes or harbours is also open to investors and local fisheries industry players. In addition, there are 505 LKIM fish landing jetties operating traditionally throughout the country. The management of these jetties is regulated by fishermen's associations or committees at each base level, comprising the fishermen and the relevant area. In Tanjong Piai, three jetties have been provided by LKIM, benefiting 118 fishermen. These jetties are managed transparently and inclusively by the local fishermen's association. The existing monitoring mechanism involves cooperation between the state LKIM, local fishermen's associations and the local authority to detect and take immediate action on any complaints regarding control or practices that oppress small enterprises. For the time being, the existing monitoring mechanism is seen as a more practical and faster measure to implement. LKIM does not allow any party to monopolise any fish landing jetty facility, such as by leasing it to private parties and so on. This is to ensure that the use of LKIM fish landing jetties can be enjoyed by all local fishermen equitably. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member for Tanjong Piai, supplementary question.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Thank you, Mr Deputy Speaker. Thank you, Honourable Minister. My supplementary question is― what policies and enforcement ensure that LKIM jetties are not used or controlled by foreign vessels or large companies that disregard the rights of local fishermen? State the number of licences or permits issued to non-local entities in the last three years, and the actions taken against unauthorised use. Besides that, Mr Deputy Speaker, in the Tanjong Piai Parliamentary constituency there are also many fishing jetties, as the Honourable Minister mentioned. However, I ask the Honourable Minister to allocate assistance funds for upgrading old and damaged fishing jetties from time to time.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Lastly, perhaps it is not very relevant, but Honourable Minister, recently there was a major destruction when a strong storm hit Kukup Laut in Kukup, which requires assistance. I particularly hope the Honourable Minister can give priority to and expedite approval for that emergency assistance. That is all, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please proceed.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

I will answer the last point first, about the storm that struck the aquaculture area. The ministry has already carried out an investigation, and officers have been instructed to take immediate action. And we hope that within a short time assistance can be provided, especially in helping with nets and so on in the form of in-kind support provided by the ministry. Officers are already carrying out their duties. As for the others, the matter of misuse of the jetty by other private boats and so on, we are monitoring it closely. We take those complaints seriously. It is not an answer to evade responsibility― to take note, take action, but we will do it seriously so that LKIM functions well and can be utilised by fishermen, especially small fishermen. That is what we are trying to do now.

[Bangun]

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member, please proceed.

Thank you, Chairman.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member for Tumpat.

My supplementary question is― in Tumpat there is one LKIM. Its name is LKIM Pengkalan Kubor, where this LKIM cannot be fully used now after COVID-19, due to the relocation of the fish sales centre from Pengkalan Kubor to Rantau Panjang.

So my question is, what action will the government take to ensure that this government-proposed facility does not become neglected, and can help fishermen, especially in Tumpat, who supply roughly 4,000 families.

And secondly, among the requests made by fishermen is the need for an ice plant so that they can also go out to deep sea, because fishing activity there is limited to certain times only, and this is a major potential source of protein for the state and also the country. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

The original question was specific, namely what happened in Pontian, in Tanjong Piai, but since the supplementary question also concerns fishermen, I will provide information in writing and ask how to help small fishermen in Tumpat, at Pengkalan Kubor. At Pengkalan Kubor, it was formerly also my route to Narathiwat. We— I have been a citizen of Kelate for 10 years. So, there are indeed small fishermen there, they do face problems, and we will ask LKIM to prepare a special report on how to redevelop the small fishermen's area at Pengkalan Kubor, in Tumpat. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. As a refresher course, Standing Order 24 is clear. If the Honourable Member asks a question that has no relation to the original question, the Minister may refuse to answer at all, and if there are three or four questions in one question, the Minister may answer one and not answer the others, and that is fine. So...

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

[Speaking without using the microphone] ...The Minister is kind-hearted, Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, I am speaking. Standing Order 41(e) is clear: if you feel too outspoken in this House while I am— first warning. [Applause] Alright, next I invite Dato' Wira Dr. Ku Abd Rahman bin Ku Ismail, Kubang Pasu.

Thank you, Mr Deputy Speaker. My question is number 2. Thank you.

Ku Abd Rahman bin Ku IsmailBERSATU · PNKubang Pasu · questionEN

2. Dato' Wira Dr. Ku Abd Rahman bin Ku Ismail [Kubang Pasu] asks

(a) what are the challenges faced in developing and advancing the country's rare earth elements (REE) industry; and (b) what are the government's plans and approaches to overcome those challenges so that the country can 'unlock' the estimated value potential of RM747 billion (estimated) of rare earths stored in Malaysian soil.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Minister of Natural Resources and Environmental Sustainability (MREST).

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

Thank you, Mr Speaker. For the Honourable Member's information, although Malaysia has significant REE resources, development of this industry cannot be carried out quickly due to several key challenges. First, the country still does not have local expertise and technology at commercial scale to carry out REE mining activities. This situation means the country has to rely on foreign technology to carry out mining activities. For example, for the first REE mining we carried out here, in Perak, at Kenering, we collaborated with MCRE Sdn. Bhd., a company from China. Then, for the processing of the REE, there is a company, Lynas, that brought its REE from Australia and processed the REE at Lynas's facility in Pahang. Second, Malaysia also still does not have a processing plant that can separate high-value REE elements commercially. At present, the global value chain for processing and separation of REE is dominated by China, including its control over the export of its technology. This constraint makes it difficult for Malaysia to develop the entire value chain, from mining and processing to producing value-added products. Third, the country faces a lack of comprehensive data on the location, quantity, grade and land-use status of REE resources. Initial estimates of REE by the Department of Mineral and Geoscience (JMG) are still at the tentative resource or inferred resource level, and require further detailed studies to determine the actual amount that can be mined economically and sustainably. And lastly, government policy that does not permit mining in sensitive areas such as Permanent Forest Reserves (HSK), Environmentally Sensitive Areas (KSAS), water catchment areas and protection reserves also limits

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

the choice of suitable locations for developing this industry. This measure is important to ensure environmental safety, but at the same time it requires a cautious approach to balance industrial development and the conservation of natural resources. As for the Honourable Member's question on what plans and approaches the government has to overcome these challenges, one of them is that the government has agreed that the strategy for developing the rare earth industry be implemented in phases, covering the short term from 2025 to 2027, the medium term from 2027 to 2030, and the long term after 2030. In the short term, the policy of a moratorium on raw REE exports is maintained to encourage investment as well as refining, separation and production plants and the production of value-added products in the country. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member, question.

Thank you, Minister, a clear answer. Mr Deputy Speaker, our country's REE is of high quality because it contains elements such as praseodymium, neodymium, dysprosium and so on, which are important for making quality, high-powered super magnets. As the Honourable Minister mentioned regarding the challenges, actually we have four challenges. I want to mention here that 96 per cent of our REE is in Permanent Forest Reserves, and only 4 per cent is outside— this 4 per cent outside is not in one pile, it is scattered everywhere, so it becomes a problem for us in developing this REE industry. I want to ask the Honourable Minister, does the government already have a roadmap or a clear direction that takes into account the challenges mentioned earlier? The challenge lies in Permanent Forest Reserves, meaning we need to amend the Act so that REE can be considered a product of the forest. Furthermore, it lies within the states, and these states have rights, have the right to obtain revenue. Has the government held discussions or engagement with these states? Furthermore, because these are less developed states, REE can help them develop their economies. Furthermore, regarding the environment, Honourable Dato' Speaker. This too is a major problem for us to face in determining the

balance between the development of this REE and environmental quality. Furthermore, in terms of technology, the Honourable Minister just mentioned that we do not have our own technology from upstream, midstream and also downstream in producing products. With which country have we identified to develop this REE, whether the United States, China, Australia and so on? Thank you, Mr Deputy Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please proceed.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

Thank you, Honourable Member. For the Honourable Member's information, indeed, our REE reserves, 94 per cent of them, are within Permanent Forest Reserves. The remaining 6 per cent is outside Permanent Forest Reserves. So, for the Honourable Member's information, in the context of this REE, we have held discussions with the state government, we have explained to the state government why we face problems in developing this REE, and much information has been given. But one thing I want to emphasise is that this REE depends on the state government. For any mining that wants to take place, if the state government does not grant approval, it cannot happen. At the Federal level, there are two things we control: one is the environment; the second is that we want to ensure that we do not arbitrarily export our REE, because we want to ensure there is a downstream and midstream chain, and this downstream takes place within the country. Otherwise, the state government only gets tribute.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

For example, in Perak today, when we allowed MCRE to carry out mining— because the Perak State Government at that time, in 2019, wanted to see what the yield from this mining would be. So, China came and showed its technology on how to carry out mining, but it takes the ore away today and brings it to China for processing. It does not do it here because it wants to assess the quality of our REE, how large its reserves are, how— whether it can justify investment in that area. So, up to today, 20,000 REE in the form of carbonate have been exported to China, and then it pays tribute to the state government, that's all. That is why we do not want areas where people come to our country, explore

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

this mining, and then take our REE out and do not want to process it in our country. That is one. I want to answer the Honourable Member's earlier question, on the environment. Indeed, 94 per cent of our REE reserves are within Permanent Forest Reserves in each state. Let me give an example for the Honourable Member: in Kedah, for instance, there are 170,000 hectares in Permanent Forest Reserves. Outside permanent forest reserves there are only 9,000. So what happens is, MREST has directed the Forest Research Institute Malaysia (FRIM) to conduct research if we want to carry out REE mining in a permanent forest reserve area; we want to study what effect it would have on the environment in that area. Because we must understand that mining has an impact on the environment. For example, when we once carried out copper mining at Ranau, Sabah, when the waste could not be handled, there were many spreading issues and matters that affected residents in that area. So this takes a bit of time, but for our reserves, we want to ensure that when we carry out mining it does not jeopardise our environment; second, it benefits the country not only by mining, but processing is also introduced. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

I hope the Honourable— the technology just now, the current technology, we know 90 per cent is in China. In Australia there is also technology, but the processing technology is at Lynas. America also says it has technology, but I have not yet seen its technology. I will wait for it to come and show what its technology is. Belgium also has it. [Applause] France also has it. Okay, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member for Pasir Gudang, please proceed.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you, Mr Deputy Speaker. Honourable Minister, at one time, tin ore was abundant in Perak. The English colonialists came and colonised Tanah Melayu, beginning with the Pangkor Treaty of 1874. Now, rare earth ore (REE) is abundant in Malaysia. I am worried about our country's independence, because the Malaysia–America Reciprocal Tariff Agreement was signed on 26 October 2025.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

My question is, what assurance does the government give that this colonial episode will not repeat itself upon our country. Thank you. [Applause]

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

Thank you, Honourable Member. Before we became independent, many people could colonise us, but now that we have merged, we all have clever people in this country. Whoever wants to come and invest may come, but they must go through the process that we want. For example, in the context of REE. If they deal only with the Federal Government, it is not enough, because the reserves are all under the state government. The state government is also responsible together with the Federal Government. They must have, if people come to do—first, ask where they want to do it. They cannot do it anywhere. Where do they want to do it? If they do it in one area outside the Permanent Forest Reserve, then we want to see how many reserves there are. After that, once we know there are many reserves, whether they can open a factory, we can justify what employment opportunities we get, what, how much tax the state government gets, how much tribute the state government gets, how many employment opportunities, how much corporate tax they want to pay. They must go through all of that first. That must be done. Then, I want to say that when they want to do it in a Permanent Forest Reserve, there are also prerequisites. Not everyone can take this and do it. They must look at whether it is a Permanent Forest Reserve, and what its impact is on the environment, which this Western country keeps preaching to us about, telling us to protect the environment. This is one example, we want to see where you want to do it. All of this is an engagement that must be carried out between the Federal Government and the state governments before they come. They cannot come just like that. So, my view is that the agreements that have been signed are in the past, but we still have the next process, through which we can defend our rights as a sovereign nation. So, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. [Applause] The House now proceeds to the third question. Tuan Cha Kee Chin, Rasah, is invited.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Dato' Speaker. My question is question number 3.

Cha Kee ChinDAP · PHRasah · questionEN

3. Tuan Cha Kee Chin [Rasah] asks the Minister of Agriculture and Food Security to state whether there are plans to implement closed, high-technology pig farming, given that the self-sufficiency ratio (SSR) is decreasing. Please state what steps have been taken by the ministry.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Minister of Agriculture and Food Security is invited to answer.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

Mr Speaker, PKPM through the Department of Veterinary Services (DVS) has plans to implement closed, high-technology pig farming. Among the steps that have been and will be taken are support and initiatives to sustain the operations of local pig farming, particularly in increasing the SSR for pork to 90 per cent by 2030. The Ministry of Finance Malaysia has expanded the scope of the tax incentive for agricultural automation, covering the benefits of Accelerated Capital Allowance (ACA) and income tax exemption for pig farming, as an incentive for pig farmers to transform open farms into closed farms, effective from 1 January 2023 to 31 December 2027. DVS continuously provides technical advisory services to pig farmers involving aspects of farm management, compliance with health standards, and effective biosecurity practices. These efforts aim to support the transition towards a more modern, sustainable farming system with low risk of disease. These services also play an important role in empowering farmers' capacity and facing industry challenges. PKPM always encourages and supports the implementation of pig farming activities on farms, closed farms through the concept of Modern Pig Farming and Pig Farming Areas. For example, in Simunjan, Sarawak, there is a PFA area that serves as a model for integrated modern farming. Meanwhile, in Tongod, Sabah, a PFA is in the process of being implemented.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHMinister of Agriculture and Food Security · Kota RajaEN

These efforts show PKPM's continued commitment to strengthening the pig farming industry towards a more sustainable, competitive and environmentally safe direction. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Supplementary question, the Honourable Member for Rasah. Please proceed.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Dato' Speaker, thank you, the Honourable Minister, for the details on that answer. I really appreciate the advisory services and also the technical services from DVS in this matter. However, for this industry, especially for closed and high-technology farming, it involves—I think two or three very important matters. One, the issue of land status, because this requires investment with high funds, and when we talk about investment with high funds, it involves injection. I understand that farmers have the intention to do this Modern Pig Farming. But how about the funds? We understand Agrobank is Shariah compliant, but how about other banks, which KPKM itself cannot help those who are interested, who are ready, but face funding problems, so that we can discuss, perhaps with Hong Leong Bank, Public Bank, to provide capital injection so that this can be achieved to revive it, as the Honourable Minister just said, SSR 90 per cent.

Tuan Cha Kee ChinDAP · PHRasahEN

I understand it is now around 65 per cent? I seek confirmation from the Minister. Thank you, Dato' Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

Yes, we do acknowledge that as a result of flu and various other names that have afflicted these pigs, which were once severe in Melaka and in Negeri Sembilan, that is why we see many of these pigs having to be destroyed due to the disease. For making new ones, we hope they proceed in a modern way. The ministry is indeed ready to facilitate those who wish to apply to other banks, and the ministry will provide support to farmers who wish to set up—to set up modern enterprises, and we will strive to help them obtain loans or support from other banks or financial institutions. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please proceed, the Honourable Member for Rantau Panjang.

Yes. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you, Mr Speaker. My supplementary question is, what enforcement actions are being taken against farms that fail to comply with the SOPs that have been—that have been put in place, including licences for waste disposal systems and also cleanliness standards. And how many actions have been taken so far, because we hear many complaints from residents about pig waste pollution causing foul odours and disease risks, especially in hotspot areas. And, does the government consider a relocation plan for old pig farms—pig farms that are too close to residents' homes, schools, mosques and also rivers, which may have very bad effects on surrounding residents? Requesting an explanation.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please proceed, the Honourable Minister.

Datuk Seri Haji Mohamad bin SabuAMANAH · PHKota RajaEN

Thank you. The DBS does always monitor and take action if there are farms that do not obtain or comply with the regulations. If there is pollution, for example, we will order action to be taken against those farms. And also the cooperation of all parties, including from the state government, especially on land matters, allowing farms to be opened illegally must also be controlled, and we always monitor this matter. If there is a specific place where pollution occurs, we will send officers to take immediate action. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. The House proceeds to question number 4. Tuan Haji Muhammad Ismi bin Mat Taib, the Honourable Member for Parit, is invited.

Thank you, Dato' Speaker. My question is number 4.

Muhammad Ismi bin Mat TaibPAS · PNParit · questionEN

4. Tuan Haji Muhammad Ismi bin Mat Taib [Parit] asks the Minister of Defence to state the technology transition plan of the Malaysian defence towards smart military, including the use of AI, automated weapons systems and cyber warfare.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Minister of Defence is invited to answer.

Tuan Haji Adly bin ZahariAMANAH · PHDeputy Minister of Defence · Alor GajahEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you, Malaysia MADANI greetings. Thank you, the Honourable Member for Parit, for the question raised. Dato' Speaker, the National Defence Transition Plan towards smart military is being driven through a transformation that places emphasis on artificial intelligence technology, automation of weapons systems and the development of cyber warfare capabilities. The Ministry of Defence, through the Malaysian Armed Forces (ATM), is finalising the establishment of the Defence Cyber and Electromagnetic Command (BSEP) as the core of the cyber forces, particularly for the country. And this BSEP is expected to be officially launched in December this year, with capability build-up implemented in phases through the Thirteenth Malaysia Plan. And this Defence Cyber and Electromagnetic Command serves as the centre of gravity in cyber and electromagnetic operations, while the concept of future forces forms doctrines, structures and high-technology assets capable of operating in a digital warfare environment. Dato' Speaker, in line with this, the establishment of a special cyber force or cyber force will enable the ATM to strengthen active defence, carry out deterrence operations and work with regional strategic partners in tackling increasingly complex cyber threats. The ultimate target is to make this BSEP a fully capable formation by 2030. This step is in line with the ATM's future force strategy, which emphasises mastery in new domains, namely cyber and electromagnetic, thereby strengthening the resilience and capability of the ATM in facing any threats of modern warfare. That is all the answer.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Minister. Supplementary question, the Honourable Member for Parit.

Thank you, Dato' Deputy Speaker. Thank you to the Minister for the answer given, yes. Alhamdulillah, we have already taken steps and started from this December. My question is, what is the ministry's timeline for expanding the use of AI in border monitoring and battlefield analytics? And, the next question, what is the plan for retraining or reskilling of our ATM personnel so that they are capable of operating increasingly complex automation and AI systems, yes. Perhaps courses will be held or they will be sent to study overseas and so on, considering that AI and smart military is a new matter. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please answer.

Tuan Haji Adly bin ZahariAMANAH · PHAlor GajahEN

Thank you to the Honourable Member for Parit for the question raised.

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

[Bangun]

[Bangun]

Tuan Haji Adly bin ZahariAMANAH · PHAlor GajahEN

When we mention artificial intelligence or AI in relation to our defence aspects, there are eight matters that we focus on alongside that question, and the answers are here. The first is surveillance, yes. We utilise AI in the context of our surveillance, whether land, air or sea. Likewise in our use of military drones, and we know that some countries require all their defence personnel to have the capability of operating military drones. So, we are moving in that direction so that this expertise becomes part of our needs. The third is also cyber defence. This is among the things we utilise in the context of AI and also our smart weapons systems. And, the use of unmanned vehicles, and if we look, it involves not only UAS and UAV, but other unmanned vehicles including the use of green technology in our military use. Likewise if we look at communication systems and also intelligence.

Tuan Haji Adly bin ZahariAMANAH · PHAlor GajahEN

And, the seventh, which is what Parit mentioned earlier about training simulators too. So, we can utilise this AI in the context of our training. And I think in the military context, simulators are among the things—an important aspect, especially in the context of our air defence. Lastly, we also utilise AI in the context of our logistics. So, if we have complete data and we know about the use of our assets, we can optimise the use of our assets. That is all the answer.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please proceed, the Honourable Member for Ledang.

Thank you, Dato' Deputy Speaker. Honourable Deputy Minister, regarding this defence technology transition, I believe it is also linked to the National Defence Industry Policy. Therefore, we understand that it will be launched next year, January—early next year. However, I think the question is how we use research and development (R&D) to defend or ensure that this technology transition is fully utilised? And, secondly, how do we also ensure that we have expertise? Is there a plan for us to give additional strength to UPNM, Universiti Pertahanan Negara Malaysia, so that there is expertise in the context of transition to new technology in national defence. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister to answer.

Tuan Haji Adly bin ZahariAMANAH · PHAlor GajahEN

Thank you to the Honourable Member for Ledang for the question raised about the National Defence Industry Policy. Because we know that we at the Ministry of Defence are indeed in the process of completing our strategy to ensure that the National Defence Industry Policy can be developed. Because we know that in the context of national defence, at present, among what we are doing through the National Defence Council is that we combine all our industrial capabilities. And, at present, we have identified, yes, the whole of the industry, whether directly related to the defence industry or industries that we can utilise

Tuan Haji Adly bin ZahariAMANAH · PHAlor GajahEN

in our defence technology, including in the cyber aspect that we mentioned earlier. That is why, if the role of our R&D was mentioned earlier, we are not only focusing on the Defence University, but in the National Defence Industry Council we actually involve all institutions of higher learning, including ministries, including the Ministry of Science and Technology and other ministries, because we know that this R&D is carried out by various of our agencies. So, it is certain that every university, for example, has certain specific expertise. That is why we give this focus and combine it in this Council. And, we at the Ministry of Defence level, we hope that when we establish the National Defence Industry Policy, we will not only develop our industry, but at the same time we can also empower our existing expertise, in its entirety.

Tuan Haji Adly bin ZahariAMANAH · PHAlor GajahEN

And at the same time, we know that in our Defence White Paper, yes, sovereignty and the nation's capability depend largely on the ability of our citizens to understand their responsibilities in ensuring the security and sovereignty of the nation. That is all the answer.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, the Honourable Member. Next, the House invites Tuan Mohd Sany bin 'Hamzah', the Honourable Member for Hulu Langat.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Dato' Speaker, "Hamzan."

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Hamzan?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Because Dato' Speaker just said "Hamzah". "Hamzah" may be the former Leader of the Opposition.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Alright, thank you, the Honourable Member.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

... Dato' Speaker likes Gardenia bread, Gardenia bread at Kota Lama; Betong, at Kota Lama...

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Where is she, my dear Cik Nyonya? My question number five....

[Dewan ketawa]

Mohd Sany bin HamzanAMANAH · PHHulu Langat · questionEN

5. Tuan Mohd Sany bin Hamzan [Hulu Langat] asks the Prime Minister to state what allocation in Budget 2025 is provided to strengthen Islamic education at the preschool, school and university levels, including the provision of quality teaching staff and ensuring the welfare of imams, KAFA teachers and tahfiz teachers is secured with commensurate allowances.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Minister in the Prime Minister's Department, please.

Dr. Zulkifli bin HasanDeputy Minister in the Prime Minister's Department (Religious Affairs)EN

Assalamualaikum warahmatullahi wabarakatuh and good morning. Thank you, Dato' Speaker. Thank you, the Honourable Member for Hulu Langat, for the question posed. Allow me to provide clarification and the best possible answer. Through Budget 2025, the government has made several announcements and specific allocations to strengthen Islamic education at the primary level, in pondok and tahfiz institutions, to ensure the quality of Islamic education is at the best level. Overall, the government has allocated two billion for the management and development of Islamic affairs in Budget 2025. This allocation covers various aspects such as Islamic education, maintenance of the infrastructure of registered Islamic education institutions, KAFA teacher allowances, takmir and imam, as well as Islamic propagation support programmes. RM150 million has been allocated for the maintenance and upgrading of the infrastructure of registered Islamic education institutions across the country, including tahfiz and pondok institutions and people's religious schools. It is worth sharing that the entire RM150 million has been 100 per cent distributed to more than 1,250 schools or Islamic education institutions. The government has also increased the quota by 1,500 KAFA teachers starting from 2025. Previously there were only 35,000 people, now it is 36,500 to meet the growing needs, especially in fardu ain education. It is worth sharing that previously the number of KAFA students was only 1.3 million, today it is 1.4 million. This justifies the increase in the quota of 1,500 KAFA teachers. The government also provides monthly allowances for imams, KAFA teachers and takmir, totalling 730 million a year. A one-off special contribution of RM500 will be given to more than 70,000 people who consist

Dr. Zulkifli bin HasanDeputy Minister in the Prime Minister's Department (Religious Affairs)EN

from imams, KAFA teachers, takmir teachers, bilal, siak, noja and marbut. This allocation totals RM35 million. For students at the Sabah Institute of Islamic Studies and Dakwah (IPDAS), the Sarawak Institute of Islamic Skills Malaysia (IKMAS) and Darul Quran JAKIM, the government has increased their living allowance by RM100 as recognition and support for their living and study costs. Accordingly, Darul Quran has already increased from RM450 to RM550 for diploma, and degree from RM550 to RM650. And at IKMAS, from RM100 to RM200; and at IPDAS, diploma from RM100 to RM200. Accordingly, the Federal Government through JAKIM, together with the state religious authorities, continuously monitors the implementation of each of these initiatives so that the allocation can be used to the best effect. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. The floor is given to the Honourable Hulu Langat.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Dato' Speaker, I seek permission, Dato' Speaker, to welcome the students of SMK Seri Desa, 40 in number, led by Cikgu Muhammad Khairol Azrin bin Abdul Rahman. [Applause] This school is located within the Tanjong Karang Parliamentary constituency. Welcome extended to the school and also to the children. Thank you, Minister. Only, Minister, the allocation for next year is RM2.6 billion, this year two billion. That means the Most Honourable Prime Minister has increased by RM600 million for the religious sector that exists in our country. Only I want to ask the Honourable Minister, can assistance be given to schools and pre-schools that are not registered with the MoE (KPM), for example, like PASTI. Because we hear our friends over there constantly talking about assistance, assistance, assistance that should be given by the MADANI Government, this Unity Government, to schools and pre-schools, especially PASTI institutions. Then secondly, Minister, I want to ask— for example, like in mosques and in surau. The preachers we bring in, sometimes they constantly spread slander. For example, that Islam is under threat, Malays are under threat, the Rulers are under threat, for example. In mosques they slander, in surau they slander, and in Parliament too they slander. That is why when Kota Bharu and also Pendang, they slander the APMM, they slander the officers and also the government staff that exist in our country...

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, question.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

...This, we cannot accept. Thank you, Dato' Speaker. Thank you, Honourable Minister.

[Laughter] Thank you, Honourable Hulu Langat. I wish to emphasise here that, based on the law on the control of religious schools in the states, including the methods of controlling religious schools in the states, it has been stipulated that all Islamic religious schools, whether at pre-school level, religious primary schools, religious secondary schools, private schools, maahad tahfiz, pondok institutions, must register the institution.

Tuan Haji Kamal bin AshaariPAS · PNKuala Krau

[Bangun]

The operation of any Islamic educational institution that is not registered with the state religious authority is contrary to the law in force. This registration is important. This registration is important to ensure safety, welfare, quality and the aspects of curriculum recognition. We do not want it to recur, how students cannot register and sit for the UPKK examination. Therefore, without valid registration, it will make it difficult to obtain any allocation specifically earmarked for Islamic educational institutions. To answer the second part, regarding the issue of preachers in mosques and surau who violate several matters emphasised or highlighted by the Honourable Hulu Langat. The state religious authorities and also JAKIM, we are also very concerned about this matter. Therefore, we look at how the ecosystem and the requirement for the tauliah ensures that those who are truly knowledgeable and deliver with full sincerity. Any who violate ethics and morals will not have their tauliah renewed and perhaps they may be subject to action. Thank you.

Mr Speaker...

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Minister. Please, the Honourable Kuala Krau.

Points of order, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Ya.

Standing Order 36(6) — a Member may not make ill-intentioned imputations against any other Member. Just now I heard Hulu Langat say in his question, "That is why we hear Kota Bharu and Pendang slander the APMM." That phrase, a phrase that can be proven in this House according to House procedure. I seek the Speaker's ruling, can it be permitted in asking a question? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Standing Order 36(4), ill-intent. The interpretation rests with the Chair, which of the ill-intent is it, whether or not, or in its consideration, it can be accepted within the framework of debate or question. For me, what was said by the Honourable Hulu Langat just now did not exceed that limit. So, that's it. Understood? That is my ruling. Continue, Honourable Kuala Krau.

Tuan Haji Kamal bin AshaariPAS · PNKuala KrauEN

Thank you, Mr Speaker. In December 2024, a Minister announced that the government would strive to ensure the welfare of KAFA teachers is guaranteed, including with regard to allowance increases. So my question is, what are the government's steps to resolve the issue of contract status among these teachers, including efforts to amend the working hour requirements or to establish a specific service scheme that enables them to be absorbed into permanent posts? That is one.

Tuan Haji Kamal bin AshaariPAS · PNKuala KrauEN

Second... [Laughter] Thank you, Dato'. Will the government introduce a specific national training standard for certification of Tahfiz Teachers, especially teachers whose schools are registered under JAKIM and so on? Thank you, Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Minister.

Okay, thank you, Honourable Kuala Krau. I wish to share here that there is indeed an existing commitment where the government has provided an allowance of RM1,100, plus EPF RM143 and PERKESO RM18.35. Apart from that, the total is RM1,261.35. However, if we look, some states have added to it. The Federal Territories, for example, RM1,000, and other states. So, I share that six states have done so for five days, yes, one state for four days and seven states for three days. So, the assistance given to

these KAFA teachers, apart from that, there is also RM500 for all KAFA teachers for one year, which is special government assistance totalling RM35 million. So, regarding the question about contract of service or scheme, yes, at present we are studying to upgrade KAFA supervisors on contract of service from grade S1 to grade S5, please pray. And alhamdulillah, we have started this, namely the Program Rintis KAFA Perdana, the KAFA S1 contract of service post scheme. This too we are carrying out. So, please pray that this project or pilot programme will succeed and we can see this matter in the future. And what I want to emphasise here to the Honourable Member is that some states have already added and the situation is very good and it has exceeded the minimum wages. Alright. Regarding the second question about the status of training, regarding these KAFA teachers, in fact we already have many trainings that we have implemented. Moreover, initiatives have also been mobilised. For example, we have the Smart Murabbi system, which is an e-learning platform system that is very systematic and the best. Apart from that, JAKIM also developed the e-Rancangan Pengajaran Harian or e-RPH. What is interesting for teachers of maahad tahfiz and pondok is that we also provide training to them. Among the very good training I wish to share here, JAKIM has introduced training on the use of artificial intelligence technology for teachers of maahad tahfiz and pondok institutions. This we have started in the Federal Territory and Selangor. And I can summarise that indeed we have implemented various initiatives and efforts. Please pray, hopefully we can further strengthen our Islamic education institutions in the best way. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. Honourable Pasir Mas, Honourable Pasir Mas, do you know why I rejected [it]?

Ya, saya.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

If the one who raised it just now, Pendang himself, then most likely my decision would be to issue a warning or punish, with permission of the Honourable Hulu Langat, but this is a third party. So, locus standi, for me, I will consider it. Understood?

May I ask one question? That is, Mr Speaker has placed locus standi as an important consideration in accepting Standing Order 36(6).

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Itu boleh...

Will it become a precedent after this?

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

If I were to make a decision just now, if Pendang had stood up, I would certainly have imposed it already, but Pendang is not here. What was mentioned was Pendang. Alright.

Okay, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

That may serve as a ruling for others if they want to take action against someone, yes. This is my view. Alright, I...

Jerlun. House rules.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

My rules, I'll deal with.

House rules. Standing Order 36(6) states, "A Member may not make ill-intentioned imputations against any..." What Pasir Mas said just now, the Members of Parliament who stated so, namely Pendang and Kota Bharu. "Any" may also refer to those two Members of Parliament. So, I propose that the authority raised here, the Speaker has the right to make a ruling on what was raised by Hulu Langat, because the word "any" he has mentioned in general and it refers to Members of Parliament in this House. So, I request the latest ruling from Mr Speaker.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, I take note of what the Honourable Member says, indeed I have also studied the matter. What I consider is that if so, anyone outside speaking can also be raised here. Meaning "any" is very, very vague and very wide. So, my consideration in interpreting Standing Order 36(6) is that I prefer the locus standi of the person concerned to be within the House. That is my ruling. Alright, we proceed to the business of the House. Just now, was the Honourable Gerik here? Ah, has arrived. Alright, wait a moment. I follow the rules, I must read

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

the Honourable Member's name. Alright, according to the procedure, the sixth question, the floor is given to Tuan Fathul Huzir bin Ayob, the Honourable Gerik.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Thank you, Mr Speaker. My question is number 6.

Fathul Huzir bin AyobBERSATU · PNGerik · questionEN

6. Tuan Fathul Huzir bin Ayob [Gerik] asked the Minister of National Unity to state whether the ministry can consider building a Force 136 War Museum and an Emergency Museum Against the Communist Party of Malaya (PKM) in historical areas within the Gerik Parliamentary constituency, to commemorate history and struggle, and also as a tourist attraction and a source of historical education for the community.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister of National Unity, please respond.

Puan Saraswathy a/p KandasamiDeputy Minister of National UnityEN

Mr Speaker, thank you for the Honourable Member's concern for the preservation of the nation's and the country's history through the establishment of museums. The Ministry of National Unity, through its agency under it, the Department of Museums Malaysia, supports any party's efforts to uplift and champion the nation's history, including through the establishment of museums. Therefore, the ministry welcomes the Honourable Member's intention regarding the proposal to establish a museum oriented towards the history of war in this country, particularly in Gerik which is one of the important sites in the military history of the nation in fighting the Japanese army and communist elements. For the information of the Honourable Member, any proposal to establish a new museum must first be studied comprehensively. This is because establishing a new museum will involve high costs including facility development, acquisition of collections and addition of new posts as well as operational costs that need to be considered. For these factors, the ministry does not intend to build the Force 136 War Museum or the Emergency Museum Against the Communist Party of Malaya (PKM). Furthermore, the Force 136 War Museum and the Emergency Museum Against the Communist Party of Malaya (PKM) are specialised museums that are more suitable to be implemented by the relevant ministries or departments such as the Ministry of Defence and the Ministry of Home Affairs, which have already established several museums on the nation's war or military history, including resistance against the Japanese army and the Emergency, such as the police museum in Kuala Lumpur, the Bukit Kepong Emergency Gallery in Muar, Johor, the Army Museum

Puan Saraswathy a/p KandasamiDeputy Minister of National UnityEN

in Port Dickson, Negeri Sembilan, as well as the Warrior Gallery at Dataran Pahlawan Negara, Putrajaya. This ministry, through the Department of Museums Malaysia, is ready to provide advisory services and expertise training to realise the establishment of this museum, and believes its establishment can bring good impact in terms of history and tourism in Gerik, just like the War Museum in Batu Maung, Penang. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Gerik, supplementary question.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Thank you, Honourable Deputy Minister. God willing, I will try to contact the parties mentioned just now. For the supplementary question, I would like to ask, does the government intend to expand the use of AI in the development of museums in Malaysia because it can attract more people's interest and the cost may also become easier and cheaper?

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, please.

Thank you for the Honourable Member's supplementary question.

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

Dr. Mohammed Taufiq bin JohariPKR · PHSungai Petani

[Bangun]

The museum agency, the National Museum Department, always takes the approach of modernising museums so that they are more appealing to teenagers and also students.

Various steps have been taken to modernise museums in response to specific requests, whether the National Museum intends to use AI in its operations or in its approach regarding exhibitions or existing collections. So far, museums have already used equipment that is more focused on digitisation of collections, where collections in museums can be accessed through the LEDs provided and collections in museums can also be visualised virtually.

And under the digitisation initiative, the MoNU has provided allocations to modernise content, especially through digitisation technology. That is all.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Minister. The floor is given to the Honourable Sungai Petani.

Dr. Mohammed Taufiq bin JohariPKR · PHSungai PetaniEN

Thank you, Honourable Deputy Speaker. Honourable Minister, as we see now, the number of admissions or the number of visitors to the museums has indeed decreased slightly, and what is the ministry's plan to ensure that there is an increase in the number of visitors to these museums? And what is the ministry's cooperation with the Ministry of Education, for example, to ensure that these students can be brought and we have a specific programme for school students to museums? And also, Honourable Minister, I praise the National Museum and so on for digitisation, but how is the cooperation between the ministry and also the state governments, for example the Kedah State Museum in Alor Setar, so that there is a synchronised system. So, meaning digitisation extends across the whole country with cooperation from the state governments? Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)

Timbalan Menteri.

Thank you for the question. To empower the functions and roles of museums under JMM for the nation and society, the MoNU has implemented various initiatives through expansion of programmes and activities, project planning and strengthening of legislation. To invigorate programmes aimed at rejuvenating museums, the Citra Nusa@Muzium Programme is implemented under the Kembara Perpaduan flagship. Efforts to improve the quality of exhibition displays to spark the minds of the younger generation in particular, as well as to improve the delivery of public services, are implemented through the Khazanah Negara Digitisation Initiative Programme. These are the efforts taken by JMM to attract more visitors to the National Museum or museums at state level. The MoNU will continue and diversify further initiatives to further empower museum activities under JMM, in cooperation with the Ministry of Education Malaysia, particularly in making the collections in museums understandable and appreciated by students in order to

foster the spirit of patriotism while learning physically rather than only from textbooks. JMM has held the Inovasi Pelajar Inspirasi Museum (IPIM) programme through the involvement of the Ministry of Education by providing an educational module for students to visit museums. These are the initiatives taken by JMM to further strengthen museums and make them more user-friendly especially for students. JMM also has programmes such as overnight stays at museums specifically for students, exhibitions for International Museum Day or programmes involving state museums, institutional museums such as the Police Museum, Army Museum and so on, which carry the concept of reaching out to the community, and programmes— all state museums fall under the Malaysian Museums Association and receive annual federal financial contributions to further empower programmes at state level. Apart from that, there are also museums at institutions of higher learning where JMM provides advice on management and collections, and this is a cooperation apart from the Ministry of Education Malaysia. We also have collaboration with the Ministry of Higher Education through higher education institutions where museums managed by them benefit students. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. We now proceed to Question 7. The floor is given to Dato' Sri Dr. Richard Riot anak Jaem, the Honourable Serian.

My question is Question No. 7.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)EN

The Minister of Plantation and Commodities is invited to respond.

Richard Riot anak JaemSUPP · GPSSerian · questionEN

7. Dato' Sri Dr. Richard Riot anak Jaem [Serian] asks the Minister of Plantation and Commodities to state the Ministry's measures to support and assist small pepper growers in Sarawak in restoring the former glory of the pepper planting industry in Sarawak, which is now increasingly declining due to rising maintenance costs.

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

Thank you, Mr Speaker. For the information of the Honourable Member, the Ministry of Plantation and Commodities is always concerned about the challenges

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

faced by small pepper growers in Sarawak, particularly those involving rising maintenance costs that may affect their competitiveness and income. The Ministry, through the Malaysian Pepper Board (LADA), in restoring the former glory of the national pepper industry, has implemented and is implementing several initiatives and strategic measures as follows. First, the initiative implemented is the provision of agricultural input assistance such as fertiliser, poison, agriculture and dolomite through the New Pepper Planting Scheme (STLB) and the Mature Pepper Planting Scheme (STLM) under the Pepper Industry Upstream Development Programme. In the Twelfth Malaysia Plan, the Government has allocated a total of RM59.6 million for this programme. The Government also allocated RM3 million under the Premium Pepper Production Development Programme for a period of three years from 2022 to 2025. This programme aims to encourage the production of high-quality premium pepper and further ensure that growers are able to enjoy better returns through premium prices. This project focuses on ensuring a consistent supply of premium pepper to meet market demand. Throughout the Twelfth Malaysia Plan period, a total of 896 small growers in Serian have benefited from STLB, namely the New Pepper Planting Scheme, with an estimated assistance value of RM4.4 million involving a planting area of 113.9 hectares. Meanwhile, for the STLM Programme, a total of 1,622 growers have benefited with an estimated assistance value of RM5.3 million involving an area of 259.4 hectares. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Serian, supplementary question, please.

Thank you, Mr Speaker, thank you to the Honourable Minister. Pepper planting is important, very important, especially for residents in rural areas, including in the Serian Parliamentary constituency. Unfortunately, Dato' Mr Speaker, for some years now, I can describe the pepper industry as 'Living reluctantly, dying unwilling'. Thank you for the Minister's very concise reply and thank you for the efforts that have been made by the Government, but as I mentioned just now, "Living reluctantly, dying unwilling." My question is rather specific, in overcoming the problem

here, Dato' Mr Speaker, I propose why not open this pepper industry as mini-estates. As we all know, so far everyone has been doing it individually, on a very small scale.

However, I believe that if it were opened as mini-estates, I am confident it could further boost this pepper industry. And in this matter, Dato' Mr Speaker, I propose that in my Parliamentary constituency, which at one time was regarded as the largest producer in the state of Sarawak. But now, as I have said just now, living reluctantly, dying unwilling. Why not open mini-estates in areas, including in the Serian Parliamentary constituency. That is all, thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister, please.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

Honourable Member, I agree that in the context of plantations we indeed need large-scale private sector involvement. We can see what has happened with other commodities. I give this as an example for comparison. Take the oil palm commodity, for instance. Why did we become the second largest producing country in the world? Because oil palm, at the beginning, was only smallholders. But today, 73 percent of the players in the oil palm industry come from large estates. That is why it has succeeded in producing national exports of RM120 billion. Employment opportunities of nearly one million, and back to our second commodity, which is rubber. We have 95 percent smallholders. So, as these smallholders have grown old, they no longer cultivate these farms, and so, up to today, we have gone from being the largest exporter of natural rubber to becoming one of the largest importers of natural rubber because there is no large-scale operation. The same goes for pepper. If we look at our country, the land area is only 8,272 hectares. So, in terms of the value of pepper, I am very confident that it is one of the very important commodities for the world. Indeed today, one tonne of pepper reaches almost 25 to 30,000.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga Batu

[Bangun]

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

If I look at the yield per hectare, it can produce 4.6 metric tonnes per hectare. If it is one hectare. The more land we obtain for planting, the easier it is for us to create a big scale plantation. So, I would like to propose to the Honourable Member, in Sarawak, there is still a lot of land. If there is land, Honourable Member, that you can give 5,000 or 10,000 hectares, we can invite the private sector to collaborate with smallholders to expand our pepper cultivation. This is a very great potential. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga Batu

Tangga Batu.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Member, please.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

Alright, thank you...

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Tangga Batu.

Tuan Haji Bakri bin JamaluddinPAS · PNTangga BatuEN

...Mr Speaker and the Honourable Minister. Alright, earlier I saw that the Honourable Minister said that the project carried out in Serian covered about 113 hectares, then there were 259 hectares that had been rehabilitated. But if we look at the records I have here, and the Honourable Minister just said that there are around 8,700 hectares of pepper in Sarawak. And the amount rehabilitated is rather small. But I see that one important factor is how these smallholders face problems with good economic practices, then disease control such as phytophthora, blackberries diseases, drying technology and post-harvesting processing. And whether the Malaysian Pepper Board actually has enough manpower to help farmers in terms of what is called extension officers, pegawai pengembangan. That is all, thank you.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

Thank you, Honourable Member. In any of our plantation sectors, the most important thing is that every smallholder or large estate must have good agriculture practices. When we have that, of course it will become an SOP or discipline that needs to be adopted.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

That is why in Sarawak, the Federal Government decided to build a LADA complex in Sarawak. To become a centre there, but unfortunately, this project was started a long time ago, but was not completed and was eventually abandoned. Recently, I spoke with the Chairman of LADA, who also comes from Sarawak, like the Honourable Member. I told him, we have to complete this complex because that is where the centre will become the R&D centre in Sarawak. It is already halfway through, almost 80 percent complete, but the contractor left the remaining 20 percent. So, we have requested a budget from the Ministry of Finance (MOF) and it has been approved to complete this complex and this complex will become an R&D and management centre, and any— whatever issues in terms of pepper cultivation will be resolved there. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. Next, we move to question number 8, the Honourable Member for Bukit Gantang is absent. We move to the question that— the ninth question. Before that, is the Honourable Member for Bachok here? If not, I will help him. Honourable Members, I would like to announce and welcome the presence of a visiting group from Sekolah Menengah Badak, Bachok, Kelantan, comprising 85 students and teachers led by Yang Mulia Tuan Haji Tengku Azmi bin Raja Ismail. Welcome to the Parliament of Malaysia. May today's visit provide benefit and a deeper understanding of the workings of the Dewan Rakyat. [Applause] Alright, next I move to the ninth question, inviting Tuan Tan Hong Pin, the Honourable Member for Bakri. [Question No. 8 – the Honourable Dato' Syed Abu Hussin bin Hafiz Syed Abdul Fasal (Bukit Gantang) absent]

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Honourable Dato' Dr., Mr Speaker. The dove flies freely, Dew drips, wetting the courtyard; Nuclear energy should be treated with caution, My question is question nine.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Minister of Science, Technology and Innovation, please answer.

Tan Hong PinDAP · PHBakri · questionEN

9. Tuan Tan Hong Pin [Bakri] asks the Minister of Science, Technology and Innovation to state the state of readiness of our country in developing nuclear energy: (a) the level of public acceptance and understanding of nuclear science and technology and what plans there are to hold more advocacy programmes for the general public; and (b) plans to enhance capabilities regarding multi-agency and community crises.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

Thank you. [Laughter]

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Can the Honourable Member answer in pantun?

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Deputy Speaker, MOSTI people cannot answer pantun. [Laughter] Thank you, Mr Speaker. Thank you, Bakri. To enhance the level of acceptance and understanding of the public towards science and nuclear technology, the Ministry of Science, Technology and Innovation (MOSTI) will draft the implementation of a more comprehensive nuclear advocacy programme with the cooperation of ministries, departments, agencies and other interested parties such as industry. And there are eight initiatives covering: (i) outreach programmes on nuclear education to schools, higher education institutions and local communities; (ii) implementation of a national nuclear technology policy communication plan; (iii) nuclear communicator training programmes as well as engagement sessions with stakeholders and local communities at nuclear facilities; (iv) skills training and expertise development programmes for local workers, K-workers, with permission; (v) industrial training programmes and research and development collaboration with local undergraduates; (vi) targeted promotional programmes on technology, preview and showcase, with permission, as well as the publication and dissemination of printed and digital information;

Tuan Chang Lih KangPKR · PHTanjong MalimEN

(vii) strategic collaboration with government agencies, academia and industry to strengthen public confidence; and lastly (viii) open days and interactive exhibitions at facilities under the supervision of the Atomic Energy Department. Through these approaches, the public's understanding and confidence in the safe, secure and responsible use of nuclear technology are believed to be able to be continuously strengthened. Next, in the aspect of enhancing crisis management capabilities. MOSTI, through the Atomic Energy Department, has focused on crisis preparedness aspects involving radiation and nuclear technology through the provision of real-time communication systems, strategic inter-agency cooperation to ensure more coordinated action, the establishment of standard operating procedures, joint engagement with industry on risks and their control, as well as the continuous implementation of public awareness programmes to enhance confidence in the regulation and safety implemented. Mr Speaker, the Government of Malaysia has sought to take the following preparedness steps, three steps. The first, adding radiation level monitoring equipment at several strategic locations within the country. The second, conducting drills or exercises involving various scenarios such as radioactive contamination in the environment or national waters with the involvement of various parties such as NADMA, the National Security Council, the Royal Malaysia Police (PDRM), the Ministry of Health Malaysia and other agencies and ministries to test and improve all related SOPs such as communication and coordination between agencies, contingency plans in the event of a radiological or nuclear accident, capacity to respond immediately and so on.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

And lastly, is to collaborate with R&D agencies or institutions such as the Malaysian Nuclear Agency, UKM, UTM, UMS and others for monitoring radioactivity content in various samples. That is all, thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Bakri, supplementary question.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Honourable Dato' Dr., Mr Speaker, and thank you to the Minister. The Minister said they cannot answer

Tuan Tan Hong PinDAP · PHBakriEN

pantun, actually MOSTI should know what the latest technology is, use AI.

[Dewan ketawa]

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Yes, yes.

Tuan Tan Hong PinDAP · PHBakriEN

Honourable Mr Speaker, this— nuclear energy now has a lot of concern among the public. And the answer just now— the Minister has not yet convinced me. Why is that, two years ago there was the release of radioactive water from the Fukushima Nuclear Plant into the sea by Japan. It caused concern, not only among its own people but across the world, including in Malaysia. And at that time, the Minister informed that our country would carry out radioactivity monitoring in real time and from time to time. So, I want to— what is it, the Honourable Minister informs this august House, what is the latest status regarding the implementation of this monitoring? And to what extent is our country prepared to face any crisis or possibility of any mistakes that may occur? How can that mechanism ensure that the level of threat to the people, especially the health of the people, can be reduced to the minimum?

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister, please.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you, Mr Speaker, thank you, Bakri. Actually we— the Government of Malaysia is in the process of exploring the possibility of using nuclear energy. We have not yet reached that stage. But to answer Bakri's question, since June 2023, MOSTI has installed one— the first unit of GSWMS or Gamma Spectrum Water Monitoring Station, which operates at the UMS Jetty, Sabah, Kota Kinabalu. And it played an important role in providing initial readings during the incident of the release of treated water, advanced liquid processing systems, by the Japanese Government in 2023. And up to 31 October this year, four more GSWMS stations have been installed and begun operating at locations such as the following: (i) Pulau Perhentian Marine Park Jetty, (ii) Pulau Tioman Marine Park Jetty, (iii) Customs Department Jetty, Bukit Malut, Langkawi; and (iv) Bintulu Port Telemetry Station, Bintulu.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

To complete the overall five units or five gamma spectrum water monitoring stations currently operating in the national monitoring network. These stations continuously monitor gamma radiation and provide real-time readings, and all data are analysed by the National Nuclear Response Management Centre. In the event of a pollution incident or radioactive waste spill, the Government has prepared contingency measures covering increased monitoring and sampling of seawater, temporary restrictions on fishing activities and the use of marine products in affected areas, and the issuance of safety warnings to the public. And all these measures will be implemented through close collaboration with the Ministry of Health Malaysia, the National Disaster Management Agency (NADMA) and the Malaysian Maritime Enforcement Agency (MPMM), and coordinated with NADMA Directive No. 1 – National Disaster Management Policy and Mechanism. Mr Speaker, so far we have not detected any level exceeding the control limits. And the Government is committed to ensuring continuous monitoring and uncompromising preparedness for the safety of the people and the sustainability of the environment. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Member for Jerantut, please.

Thank you, Mr Speaker, and thank you to the Minister. When the Minister told us about the various programmes implemented earlier to enhance public understanding. The question from Jerantut is how do we study public acceptance? We have carried out programmes. So, how do we judge whether they accept or reject the development of nuclear technology that will be developed as early as 2031? And when this question states about our country's readiness, and we also want to move towards a carbon-neutral country by 2050. Malaysia has already entered into an NDA agreement with Rosatom— MyPOWER with Rosatom. [Showing a document] And it intends to develop a floating unit, named as FPU. So, my question on this matter. Will this FPU be implemented while we still do not see public acceptance, especially understanding

of the people about the development of this technology? Even though in reality this FPU is a small scale of nuclear development. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

The Honourable Minister, please.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you, Deputy Speaker, thank you, Jerantut. And for the information of this august House, MOSTI, through the Malaysian Nuclear Agency, is conducting a study on the level of public awareness and acceptance of nuclear science and technology. Although not— not specific to nuclear energy but this is on nuclear technology, is being conducted. The number of respondents so far— because it is still being conducted, so it has not yet reached the target. So far only 174. But we will complete this study. And for the information of this august House too, this FPU is a small-scale unit. It is a type of SMR and actually we— even though— even though there is an NDA, we are still in the study stage. MOSTI — even though in that position — that committee, but the one responsible is PETRA. But we will ensure that the project or initiative to be carried out will obtain the approval of the people. And this will not happen within two to three years or five years to come, so, we will ensure it will receive acceptance from the public. Thank you.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Minister. With that reply from the Minister, Honourable Member, the session for oral question time is now concluded.

Mr Speaker, Mr Speaker, Besut. Mr Speaker, Besut.

Deputy Speaker (Dato' Dr Ramli bin Dato' Mohd Nor)EN

Yes, please. Point of order?

Standing Order. Standing Order 43. I won't read the second one. The first one, I'll read, 43. "Mr Speaker in the House or the Chairman in a Committee shall be responsible..." The words used are "...shall be responsible for ensuring that the Standing Orders of the House or Committee are observed,...". That is a great power. Okay. In other words, there is no provision in this that states that a point of order must be raised. This

power, this power, okay. But if we look at the English version, 43. The words used are "shall be responsible for the observance". In other words, the one who must carry out the duty is the Yang di-Pertua. In other words, it appears the Yang di-Pertua only has language that— a breach of 36(1) to (12).

That is, that is the Yang di-Pertua's power. It doesn't have to wait for anyone to raise it. So, the question of locus standi does not arise. The decision made by the Yang di-Pertua just now was 99. In other words, a ruling, yes. If we look at 99, it concerns rulings. That is, "The Speaker's decision on any matter of interpretation in any Standing Orders..." In other words, this is a ruling that was made. But in terms of 43, it seems to me that the Yang di-Pertua has not yet carried out the duty today. What I want to refer to is what the Honourable Member for Hulu Langat said.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Yes, alright, Honourable Member. Please sit, Honourable Member.

Terima kasih.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

I considered the decision relating to Hulu Langat because I took it as a lesson. A and B. A defames B, C cannot interfere. This is the basis for me. So, there must be locus standi. The Honourable Member for Pasir Mas and the Honourable Member for Hulu Langat mentioned Pendang. Pendang is not here. Ah, so that is my decision. When the Honourable Member— er, where was it? Ah, Jerlun raised it, whoever it was. So, it is too wide in the interpretation of the law. For me, I hold to the law, to the rules. The party concerned also cannot be like that. It must be specific. If we accuse a person, we must accuse you of stealing. A stole, not, eh, I think you stole. It doesn't work. So, there must— a charge must be specific. In this matter too, that is my decision. Alright, on the issue the Honourable Member mentioned just now, yes. It is indeed the Chairman's responsibility to manage, and if in awareness, we must take note that human weakness, yes. 100 sections [Holding up the Standing Orders of the Dewan Rakyat] no one except AI can remember all of them. Likewise me, when I served before. Not— the Penal Code has 511

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

sections. It does not yet include the general laws in the country to be implemented. So, if an oversight occurs, it is the responsibility of the other Honourable Members to correct it. That is why Standing Order 37 exists. 37(1), paragraph (1), paragraph (2). Ha, interrupting and so on, if there is a need to correct a particular breach of the rules. That is how it is. So, I think we don't need to go on at length. The Honourable Member before, I was used to being, ah, a prosecutor. So, I understand the situation and so on. Alright. Let us continue to the court matter now. The House's business. Ah, please, Honourable Minister. [End of Oral Questions session]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Puan Saraswathy a/p KandasamiDeputy Minister of National UnityEN

Mr Speaker, "Under Standing Order 12(1), I respectfully move that the sitting today shall not be adjourned until the deliberations and decisions at the Committee stage for the Ministry of Energy Transition and Water Transformation and the Ministry of Science, Technology and Innovation on the Rang Undang-undang Perbekalan 2026 and the Usul Anggaran Perbelanjaan Pembangunan 2026 have been completed, and after that the sitting shall be adjourned until 10 a.m. on Thursday, 20 November 2025."

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Is there anyone who supports?

Datuk Seri Dr. Noraini binti AhmadUMNO · BNDeputy Minister of Women, Family and Community Development · Parit SulongEN

I respectfully second.

Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member. Honourable Members, I now put the question to the House as the motion has been stated by the Minister just now. So, those who agree, say agree.

[The motion was put for decision; and agreed to]

Bill — Supply Bill 2026 and Development Estimates Motion 2026 CommitteeBill

The Order of Business was read to resume consideration of the "Rang Undang-undang Perbekalan 2026 and Usul Anggaran Perbelanjaan Pembangunan 2026 in the Committee of the Whole House". [Ninth Day] [The House sat in Committee] [Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) chaired the Committee]

Bill — Supply Bill 2026 and Development Estimates Motion 2026 Committee — Head B.33 [Schedule] – Head P.33 [Development Estimates 2026] –Bill

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Bentara. Honourable Members, the Ministry of Energy Transition and Water Transformation (PETRA). Supply Head B.33 and Development Head P.33 under the Ministry of Energy Transition and Water Transformation are open for debate. So, on this list there are 25 Honourable Members who will debate. The list is as follows. The opening debater is the Honourable Member for Kota Melaka, followed by the Honourable Member for Rompin, the Honourable Member for Wangsa Maju, the Honourable Member for Kubang Kerian, the Honourable Member for Batang Lupar, the Honourable Member for Mersing, the Honourable Member for Tanjong Piai, the Honourable Member for Merbok. The Honourable Member for Rasah, the Honourable Member for Arau, the Honourable Member for Tebrau, the Honourable Member for Masjid Tanah, the Honourable Member for Lubok Antu, the Honourable Member for Pasir Mas, the Honourable Member for Beruas, the Honourable Member for Temerloh, the Honourable Member for Puncak Borneo, the Honourable Member for Tanjong Karang, the Honourable Member for Tenggara, the Honourable Member for Kangar, the Honourable Member for Hulu Langat, the Honourable Member for Padang Serai, the Honourable Member for Balik Pulau, the Honourable Member for Sik and finally the Honourable Member for Batu Pahat. The time set for each debater is five minutes. However, this is subject to the discretion of the Chairman presiding over the House.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

In line with this, I would also like to remind once again Standing Orders 35, 36, 37, 41, especially 41(e) concerning conduct in the House. I now invite the Honourable Member.

Mr Speaker, Mr Speaker, may I ask for a little clarification. I think Mr Speaker misspoke. Pasir Mas or Pasir Puteh? Can you check the list again. Pasir Mas or Pasir Puteh? The list of debaters.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

What number was it just now? Pasir Puteh. Ha, Pasir Puteh, not Pasir Mas, a mistake.

[Dewan ketawa]

Never mind, both are fine.

Mr Chairman (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member does not want to debate? [Laughter] Alright. We will correct it, the Honourable Member for Pasir Puteh. So, I invite the Honourable Member for Kota Melaka.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Thank you, Dato' Deputy Speaker. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] I refer to Item 15100 – Prevention of Coastal Erosion. First of all, I would like to thank the PETRA Ministry, which has provided an allocation of RM500,000 for a project to address the coastal erosion problem at Taman Permatang Pasir Perdana Phase 3 in the Alai area, in the Kota Melaka Parliamentary constituency. This project covers rehabilitation of coastal erosion, yes, by carrying out coastal protection works for 100 metres in length. However, when the contractor who was appointed went to the site, we were informed that the area facing coastal erosion is in fact 130 metres long. But the project offered to them was for a 100-metre project. So, there is another 30 metres, and they will not build barriers or coastal protection works for those 30 metres.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

So, I hope the PETRA Ministry can further consider providing emergency allocation to complete the remaining 30 metres. And I also hope that in next year's budget, the RM172 million mentioned will also include a long-term project, namely building a breakwater in the area of Taman Permatang Pasir Perdana Phase 3, so that the problem can be resolved over the long term. Next, I refer to Item 020100 – Energy Management. Deputy Speaker, if we look at the issue I want to raise, it concerns meter tampering and illegal use of electricity supply, especially in Bitcoin or cryptocurrency mining.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

If I refer to the answer to the oral question I submitted yesterday, 18 November, which I received. In the answer provided by the ministry, it says that from 2020 until August 2025, a total of 13,827 premises have been successfully dismantled by TNB for the activity of using electricity supply illegally to carry out cryptocurrency mining, especially Bitcoin. So, the total loss for that period is RM4.57 billion. A very large figure. If we look at our budget, the Ministry of Youth and Sports, for next year, its budget is only RM1.182 billion. In other words, during that period the loss is four times the allocation to one ministry, namely the Ministry of Youth and Sports. So, this is a very large figure, and what I see is that this is a threat. A threat to our country. It is an enemy to our country in terms of the economic development of our country, yes, if we look at the figures involved. So my question is, is this activity of cryptocurrency mining, especially Bitcoin, a legal one in our country? Today, if they tamper with meters, we say that it is an illegal activity. But if they use electricity supply normally, would we consider that to be something lawful? Yet we know that if this mining activity uses electricity supply normally, they will not get any profit. Mining activity will only profit if they steal electricity from TNB, only then can they make a profit.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

So, do we want to enact an Act to make this cryptocurrency mining illegal? Because in other countries, for example in China, they have made cryptocurrency mining illegal. So, as mentioned, this is a serious threat to the national energy supply system. So, I want to ask the ministry, yes, where such electricity theft occurs, the usual victims are the owners of buildings, whether houses or shops, yes, where the syndicate will rent a shop or house and then when they are exposed, the tenant will flee. The ones who become victims, who have to bear all the losses claimed by TNB, are the shop owners, because TNB says the house is yours, the meter is under your name, so you must take responsibility to pay the losses. But, if we follow this logic, I want to ask TNB, because when this syndicate uses and carries out its activities during that time, perhaps two years, three years. Why is it that TNB often says they will devise strategies to detect, but they cannot detect? They only detect after two or three years. If we follow that logic, should TNB also be responsible? Why could they not detect such activity at the beginning?

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila gulung.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Only at the end, after two or three years, does TNB detect it. Supposedly you have a sophisticated system, yes, that can detect it. Why can't it be detected at the beginning?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

So, finally, I want to ask the ministry. A little time.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

More than two minutes has passed.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Yes, I want to ask the ministry. Is the ministry prepared to amend the existing law to penalise those who steal this electricity? Because the current Act provides a maximum of RM200,000 or five years' imprisonment. But when we look at the court decisions that I have seen, many only impose fines of RM50,000, RM60,000, yet the losses they have stolen amount to millions.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Therefore, the existing Act does not make them afraid, and they will continue this illegal activity. And in the end, it is actually the people who bear the losses, because TNB will not absorb all those losses. It will pass those losses on to their costs, and in the end the electricity-consuming public has to bear these huge losses. So, I hope that firm and effective action, including amendment of the Act, must be taken. That is all. Thank you, Deputy Speaker.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Kota Melaka. I invite the Honourable Member for Rompin.

Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Madam Chairman. I refer to Item 15100 – Prevention of Coastal Erosion, an estimated RM172,423, together with Item 15300 – Dredging of River Mouths, an estimated RM200,201,600. This large allocation outlines the government's commitment to addressing environmental sustainability issues, especially those involving water resource management and coastal zones, which are now under the umbrella of PETRA. Madam Chairman, I would like to draw the Committee's attention to the situation of coastal erosion that is increasingly severe and threatening in the Rompin Parliamentary constituency. Erosion here is no longer a natural problem, but has become a social and economic security crisis that requires immediate government intervention. Critical locations in the Rompin area. First, Kampung Jawa, Kuala Rompin. The erosion situation is described as worrying in the area near the residences of the Projek Perumahan Rakyat Termiskin (PPRT). This situation has affected residents and forced consideration of relocating them. Second, Kampung Tanjong Pahang. This area has also been identified as one of the beaches in Pahang experiencing critical erosion. Why must PETRA's immediate action be carried out? First, the risk of disaster and loss of life. With the Northeast Monsoon that frequently brings strong waves, delay in action means the risk of losing property will continue to increase in areas such as Kampung Jawa.

Second, guaranteeing the economic sustainability of fishermen. Kuala Rompin is a fishing community. Erosion and siltation problems at the river mouth affect the marine ecosystem and fishermen's access to the sea, thereby threatening their source of income. Third, protecting national assets. Allowing erosion to continue will only result in much higher costs for repairing public and social infrastructure in the future. To ensure that the allocations under Items 15100 and 15300 are utilised in a strategic and effective manner in Rompin, I request answers and proposed action from the ministry. My question is, what is the final status and timeline of the erosion prevention project in the focus areas, namely Kampung Jawa and Tanjong Pahang? Does the government intend to build coastal protection structures such as breakwaters? Second, apart from physical barriers, will PETRA include a coastal ecosystem restoration plan and sustainable development such as mangrove replanting as a long-term solution on the Rompin coastline? The second, Dredging of River Mouths – Item 15300. My question is, does the allocation under Item 15300 cover dredging operations at the Rompin River mouth which serves as the entrance for the fishing community in Rompin? Second, what are the results of the erosion and hydraulic impact study, to ensure that the river mouth dredging works will not accelerate or further worsen the coastal erosion problem in the Kuala Rompin coastal area? The second, I now turn to Item 15400 – Environmentally Friendly Drainage River Management Scheme, namely the Endau River Conservation Project at Kampung Sarang Tiong, Kampung Setajam and Kampung Pianggu. Madam Chairman, under Item 15400, I want to raise an urgent issue involving the mukim of Endau. Kampung Sarang Tiong, Kampung Setajam and Kampung Pianggu are now exposed to serious riverbank erosion. The Endau riverbank along this stretch lies beneath a river bend, making the area naturally prone to active erosion. The daily tidal fluctuations, coupled with strong currents during the Northeast Monsoon and annual floods, have accelerated the erosion process to the point of major collapse in several segments of the bank.

The damage that has occurred is not small, Madam Chairman. There are collapse sites hundreds of metres long, including areas near the village jetty, the main route used by residents and educational institutions. In total, the erosion-risk area involves a stretch of five kilometres, and the condition is deteriorating from year to year. Erosion that is not addressed immediately will have major implications: (i) threatening the safety of residents' homes and village routes; (ii) affecting basic infrastructure including jetties and utilities; (iii) damaging the ecosystem of the Endau River, an area important to inland fisheries and the community's economy; and (iv) affecting the income of fishermen, livestock farmers and Orang Asli communities who depend on this river. Madam Chairman, in line with PETRA's direction through Integrated River Basin Management (IRBM), water sector transformation and the Nature-based Solutions (NbS) approach. These river conservation works need to combine environmentally friendly engineering solutions, strengthening of the riverbank structure, and restoration of the riparian zone to ensure long-term effectiveness. Accordingly, I request that PETRA: (i) expedite the implementation of the Endau River rehabilitation project under Item 15400; (ii) carry out detailed hydraulic and geotechnical studies to determine the most suitable bank protection design; (iii) prioritise the use of bioengineering and NBS technology to reduce maintenance costs and increase bank resilience; and (iv) make the Endau River stretch a focal area for conservation under the IRBM implementer for Rompin. This project is not merely about protecting the riverbank, it involves the safety of the people, the economic sustainability of the community and adaptive resilience to

climate change. I hope that PETRA can give high priority to this conservation project for the welfare of the Rompin residents. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Rompin. I invite the Honourable Member for Wangsa Maju.

Tuan Ir. Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Thank you, Madam Chairman. Rice is carried in sacks, Water is carried in buckets; If such waste continues, How long must the people bear the loss? Now to Item 95000 – National Non-Revenue Water (NRW) Programme and National Non-Revenue Water (NRW) Programme Approach 1 Phase 2. RM3 billion is allocated to focus on reducing NRW, among other things, through replacing old pipes over more than 820 kilometres in six states: (i) Johor; (ii) Melaka; (iii) Negeri Sembilan; (iv) Kelantan; (v) Pahang; and (vi) Selangor. What is the benefit? Among them: (i) it will improve water supply and water quality; (ii) long-term savings; and (iii) improved reliability, with permission. Success depends on priorities based on data, phased implementation, quality monitoring, and technological and institutional measures to ensure water savings and the sustainability of the long-term supply system. Data for 2024 shows the NRW problem is still serious in several states. Four states in particular, Perlis, Kedah, Kelantan and Sabah, recorded NRW rates exceeding 50 per cent, indicating very high water losses and financial and service implications. Also in 2024, six states, Kedah, Pulau Pinang, Perak, Pahang, Terengganu and Labuan, showed an increase in NRW percentage

Tuan Ir. Ts. Zahir bin HassanPKR · PHWangsa MajuEN

compared with 2023. This data indicates a serious problem that requires immediate action and targeted strategies for each state. We have been informed that direct grants of RM535.5 million have been allocated for states recording NRW rates exceeding 40 per cent: (i) Kelantan; (ii) Kedah; (iii) Pahang; (iv) Perlis; (v) Sarawak; (vi) Sabah; and (vii) Labuan. As for incentive grants, yes, incentive grants are paid back to state operators whose NRW rates are below 40 per cent: Melaka, Pulau Pinang, Johor, Negeri Sembilan, Perak, Terengganu and Selangor. Water operators will be repaid 50 per cent of the total expenditure on NRW reduction if the annual NRW reduction target is achieved. Let us look closely at treatment costs. When we speak of water treatment costs, it means the cost of pumping, conveying raw water to the water treatment plant, and treating raw water until it leaves the plant at the water quality stipulated according to international standards. For example, water that is murky like teh tarik is clarified. Bacteria contained in raw water are neutralised. High metal content in raw water is removed. All of these are necessary treatment processes and, of course, each treatment involves a cost. This cost varies depending on the treatment system used and the operator running the treatment plant. In Malaysia, the cost of treating raw water per cubic metre ranges from 50 sen to RM1.33 per cubic metre. As an indication, if we take the average treatment cost as 70 sen per cubic metre, and we note that Malaysia's NRW rate is 37.6 per cent, this means that out of the total of 20.17 million cubic metres produced each day, a total of 7.54 million cubic metres of treated water has been lost. In terms of value, this amounts to RM1.65 billion a year that we waste, that we have spent to treat raw water, wasted for nothing.

Tuan Ir. Ts. Zahir bin HassanPKR · PHWangsa MajuEN

Perlis recorded the highest NRW, at 61.5 per cent. Perlis wastes approximately RM41.6 million every year, and Selangor, although its NRW is 27 per cent, wastes roughly more than RM360 million every year. This clearly illustrates that NRW is a clear form of waste. RM3 billion is public money. It is the sweat and taxes paid by every citizen. We cannot allow this money to leak away like water from a worn-out leaking pipe. We cannot allow it to become a black hole, that is, a blackhole, with permission, where accountability disappears and waste runs rampant. Stop this waste. The people are entitled to efficient water services and their money spent well. Therefore, Wangsa Maju humbly supports the motion. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Wangsa Maju. I invite the Honourable Member for Kubang Kerian.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Mr Chairman, first of all I would like to welcome the presence of teachers and pupils from Sekolah Kebangsaan Dato' Haji Zainuddin, Serdang, Kedah, yes [Applause] into the House. They are from the Kulim-Bandar Baharu Parliamentary constituency to the Dewan Rakyat, yes. I hope they gain a useful experience, insya-Allah. Firstly, I would like to take up, to discuss several matters including what was raised by Wangsa Maju as a continuation of Item 95000 – National NRW. The NRW issue is a very worrying one. If we look at what was presented by Wangsa Maju, I want to take a rather different segment but a continuation of what was raised. If we look at 2023, our NRW was at 37.1 per cent. The government's official target is to fall to 28.8 per cent by 2030. Even to 31 per cent this year. This means our target is getting worse by the day, and the data available shows us that, day by day, the national NRW performance is becoming increasingly critical. Perhaps this is due to a few major factors, namely the lengthening lifespan of our pipes, and the leakage rate is increasing.

However, what I want to raise is that current trends do not show us to be on that track.

Instead, after nearly a decade of decline between 2008 and 2016, NRW has started to rise again in most states. For example, Melaka surged from 21.2 per cent to 35.1 per cent, Negeri Sembilan from 31.9 per cent to 38.9 per cent. Likewise Terengganu from 34.6 to 40.1, and as partly mentioned earlier by Wangsa Maju, several states exceed 50 per cent. I understand the burden borne by PAAB, the National Water Asset Corporation (Perbadanan Aset Air Negara), when they explain that replacing all old pipes requires a very large cost. PAAB owns only 25.6 per cent of the national pipe network. Out of 138,587 kilometres of water and sewerage pipe networks in Peninsular Malaysia and Labuan, nearly 40,000 kilometres of these pipes use asbestos cement and are more than 60 years old. Yet the lifespan of these pipes is 40 years. This means they have exceeded the replacement period by more than 20 years. To replace all these old pipes, state governments or state water operators will simply be unable to afford it. Across the whole country, it is estimated that RM35.8 billion is needed, whereas the current allocation for state operators is only RM1.87 billion, with most of it relying on the funds of the National Water Asset Corporation and grants from the Federal Government. I see two things. Firstly, the states really cannot afford it. Some states' loans have already reached the maximum. The time has come for the mechanism for managing NRW water to be handled by the Federal Government. If we hand it over to state governments, the states simply cannot afford it. State water operators have reached a point where they can no longer borrow because total loans exceed the period and they have failed to pay. Some of the issues in this case, for example, are that our NRW has three approaches. The first approach is Federal grants. However, most of it focuses on replacing some pipes, and some on replacing old tanks. The issue is that when water pressure is low, some water cannot enter the large tanks. That is why we see many of the tanks built not functioning. They cannot be used because of low water pressure. Eventually, water pipes are simply channelled to homes. And I feel this requires an approach within the context of this NRW approach.

Secondly, as mentioned by Wangsa Maju earlier, indeed the states have not achieved it. I recall only one or two states that succeeded in establishing a mechanism for the second approach. Let alone the third approach. For the third approach, because the ROI of water projects takes a long time, not many companies are keen to invest in the third approach. I see the need for a comprehensive review of the national NRW approach, including also the process of building water treatment plants on the mainland that are channelled to the islands. This too is something that needs to be reviewed.

Dato' Rosol bin WahidBERSATU · PNHulu TerengganuEN

Kubang Kerian, may I interject. It was said earlier that the target is to be achieved by 2030. With the current trend, does Kubang Kerian feel that the target is impossible to achieve? What is Kubang Kerian's view?

Dato' Sri Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Yes, I agree that this target will not be achievable. There is no time. Mr Chairman, I would like to continue a little further. For example, yes. When treatment projects are carried out on the mainland, we channel treated water to the islands. What is happening now is in Langkawi. Water pipes are leaking. I recall it has been almost five years. The repair cost is very large. State governments simply cannot afford it. Federal loans have reached a level that cannot be covered. A new pipe replacement is needed. The mechanism that should have been put in place is to send raw water to the island and treat it on the island. If leakage or seepage occurs, we will not increase the NRW rate. That is just an example. I also want to look at the government's mechanism through SPAN, the National Water Services Commission (Suruhanjaya Perkhidmatan Air Negara), to set a standard response time nationwide, because the SOPs of these states differ, causing the process to replace or resolve leakage problems to be slow when leakage occurs. We need an intervention to reduce this NRW. The programme for replacing old pipes should be restructured, and I suggest a mechanism, if possible, for the Federal Government together with state governments to negotiate a mechanism like TNB. The Federal Government takes over the treatment process. Buys water resources from the states because these water resources are the states' rights. Water is bought from state governments, treatment is managed by a scheme set up at Federal Government level so that ― the issue

Dato' Sri Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

this needs to be done urgently, because if we are slow, we will lose investors due to insufficient water supply and so on.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up.

Dato' Sri Tuan Ibrahim bin Tuan ManPAS · PNKubang KerianEN

Mr Chairman, as time did not permit me, I think I have only been able to raise one issue. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Kubang Kerian. I invite the Honourable Member for Batang Lupar.

Tuan Mohamd Shafizan Haji KepliPBB · GPSBatang LuparEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace and salam segulai sejalai. Thank you to Madam Chairman. I seek to participate in the debate on the 2026 Budget at the Committee stage for Head B and P.33 for the Ministry of Energy Transition and Water Transformation. Madam Chairman, I go straight to Item 15000 – Minor Works JPS, Various States, allocated RM81.7 million. Madam Chairman, cleaning and maintaining drainage and waterway systems is very important to reduce flash flood incidents. Clogged drains that are rarely maintained cause water to flow slowly out to rivers, and when heavy rain or high tides occur, it has the potential to become prolonged flooding that takes a long time to subside. This scenario has become a daily routine for some residents in the Batang Lupar Parliamentary constituency, which is an estuarine and swampy area. A more proper drainage system needs to be planned to ensure water flow in this area is smooth and can accommodate increased water volumes during rain or the monsoon season. Therefore, I would like to request that the Drainage and Irrigation Department (JPS) provide allocations to carry out cleaning and upgrading works for roadside drains along the stretch from Bandar Sri Aman to Kampung Lingga along the area from Kampung Seruyuk to Kampung Sebuyau in both directions, as well as along the road from Jambatan Sungai Saribas to Kampung Teriso.

Tuan Mohamd Shafizan Haji KepliPBB · GPSBatang LuparEN

Next, Madam Chairman, I would also like to raise Item 15300 – Dredging River Mouths, allocated RM200.2 million. I would like to propose that dredging works for the Sungai Maludam estuary be carried out under this allocation to reduce the recurring risk of flooding. I also urge JPS to study and prepare a concrete exit plan, with permission, to resolve the problem that has long plagued residents in the Kampung Maludam area. I also request that JPS look at longhouse areas. Among them, Rumah Panjang Sungai Daun, Rumah Panjang Sungai Mulon, Rumah Panjang Sungai Pedada, Rumah Panjang Sungai Meranti, Sungai Suak and Tanjung Baru, which are also experiencing the same problem, where it affects the economy of residents because crops planted such as paddy and oil palm are also affected. This is because year after year, Madam Chairman, the Sungai Maludam is becoming increasingly shallow due to sediment deposition, and it worsens when heavy rain occurs. The drainage system is unable to cope with the overflow of water, resulting in flooding in this area. The next item is 15100 – Coastal Erosion Prevention, allocated RM172.4 million. Madam Chairman, apart from the flood problem, several areas in the Batang Lupar Parliamentary constituency, including Kampung Maludam, also face the risk of coastal erosion that threatens the safety of lives and property of residents. I understand that the ministry, through JPS, is implementing a project to address coastal flooding in the state of Sarawak, which will involve building coastal flood protection structures for erosion control and related works.

Tuan Mohamd Shafizan Haji KepliPBB · GPSBatang LuparEN

I understand this project will take approximately five years to complete. Therefore, I would like to ask the ministry, will this project commence in December 2025 as expected? For Madam Chairman's information, there is a very urgent need to save several houses in Kampung Maludam. Therefore, I humbly request that the ministry channel some allocation to JPS Betong so that they can take temporary mitigation measures to save the Kampung Maludam area from the threat of erosion.

Tuan Mohamd Shafizan Haji KepliPBB · GPSBatang LuparEN

Lastly, Item 40000 – Energy Efficiency and Renewable Energy Programme, allocated RM10.8 million. I would like to request some clarification on this programme and the extent to which it is aligned with the Sarawak Energy Transition Policy (SET-P), with permission, which is a policy that plans the direction of energy transition in the State of Sarawak. I would like to ask, what efforts and plans does the ministry have in promoting the widespread use of renewable energy sources in Sarawak, particularly solar energy? How can we ensure that the use of solar energy as an electricity source can be expanded in rural areas, taking into account the maintenance aspects of these solar panels? Is there a specific strategy to produce more energy and experts from among local people in the field of solar energy and other alternative energy sources? Finally, Madam Chairman, I hope that the budget this time will allow the ministry to continue moving Malaysia towards energy transition, with a focus on efforts to reduce carbon emissions and promote the use of renewable energy. That concludes my remarks, Madam Chairman. Thank you. I humbly support the motion.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Batang Lupar. I invite the Honourable Member for Mersing.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I refer to Item B.020000 – Energy Management, B.020100 – Electricity Supply. I welcome the allocation of RM7.5 million for improvements to electricity supply, because it is important to ensure a stable and safe supply for the people. However, the issue of theft of electricity supply and cables remains worrying, disrupting system stability and burdening the finances of utility companies. TNB has borne losses of RM441 million since 2020 until September 2024 due to these activities, which may ultimately put pressure on operating costs and electricity tariffs. Although enforcement has been carried out, theft remains rampant, especially in rural areas with little supervision. Accordingly, I would like to seek clarification. Firstly, what are the government's strategic measures and new interventions to address the theft of electricity supply

and electricity cables, especially to reduce the major losses of TNB and their implications for the public. Second, how will this RM7.5 million allocation be distributed, and what specific projects will be implemented to improve the safety, reliability and stability of electricity supply throughout the country? In addition, I would like to raise the issue of electricity theft by illegal cryptocurrency mining premises, including Bitcoin. These activities consume large amounts of energy and are usually carried out by illegally connecting to the supply. In this regard, I would like to ask. First, what is the total amount of electricity losses borne by TNB due to illegal crypto mining since 2020 until now, and what monitoring methods are currently being used to detect unusual energy consumption at industrial and commercial premises? Second, what is the number of raids on illegal crypto mining premises by TNB and the Energy Commission (Suruhanjaya Tenaga) in the last three years, including the number of arrests and the status of prosecution under section 37 of the Electricity Supply Act 1990? Next, Item P.15100 – Preventing Coastal Erosion, P.15300 – Dredging River Mouths. I would like to draw attention to the issue of coastal erosion and river mouth sedimentation in Mersing, which is now at a critical level. More than 15 kilometres of coastline, including the Mersing River Mouth, Ayer Papan and Sekakap, have been classified as category 2 risk zones that could threaten public property and infrastructure within five to 10 years if no immediate action is taken. I urge PETRA and the Johor Department of Irrigation and Drainage (JPS) to expedite the protection plan, including breakwaters at the Mersing River Mouth. Non-structural approaches such as National Sediment Management should also be strengthened, because dredging works costing as much as RM400 to RM450 million only have a temporary effect. Meanwhile, sedimentation keeps recurring due to natural hydrodynamic changes. In this regard, I would like to request an explanation regarding, first, the status of the sediment study of the Mersing River mouth, when it will be finalised, and to what extent the findings of this study offer a long-term solution? Second, a reassessment of the cost of dredging works, given that the effectiveness of this method is decreasing even as costs rise? Third, the level of physical progress of the Sekakap coastal erosion control project worth RM30 million, scheduled for completion in the third quarter of 2026, and fourth, a full list of new applications that have been approved under RP1 and RP2 of the RMK13.

for the Mersing area, covering mitigation projects for coastal erosion on the mainland and islands, river mouth management, and upgrading of coastal infrastructure, in line with the Johor Integrated Coastal Management Plan. Item P.15200 – Improving, Beautifying, Cleaning and Treating River Water and Infrastructure (MASMA). The allocation of RM280 million under the MASMA programme for 2026 is very important for increasing drainage capacity, strengthening river banks, reducing the risk of flash floods and restoring river ecosystems. In this regard, I would like to request a detailed explanation from the ministry on the following three matters. First, the total MASMA allocation disbursed to JPS Johor, including the specific breakdown allocated to the Mersing District, given that this district has more than 40 rivers and drains that require continuous maintenance to prevent flash floods and overflow problems during high tide phenomena. Second, a complete list of small projects in Mersing that have been approved under MASMA 2026, covering works such as river channelling and deepening, bank stabilisation, revetments and gabions, beach upgrading, main and secondary drains, and maintenance of existing water control structures. Please attach the project locations, estimated costs, scope of works and implementation schedule, as these are critical to ensuring the effectiveness of mitigation measures at district level. Third, the selection criteria for projects under MASMA, including the determination of priorities based on flood risk, level of bank damage, critical maintenance needs and population density. I would also like to know where Mersing stands in the priority ranking of the state of Johor, given that this area has repeatedly been hit by major floods due to a combination of heavy rain, slow river flow and the tidal break flow phenomenon in the South China Sea. That is all, thank you Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Mersing. I invite the Honourable Member for Tanjong Piai.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Thank you, Madam Chairman. I would like to refer to Item 13900 – Flood Control and Warning System Plan together with Item 14500 – Upgrading of Urban Infrastructure and Drainage, Flood Mitigation. I would like to draw the ministry's attention to two increasingly pressing flood issues caused by high tide seawater in the Tanjong Piai parliamentary constituency.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

First, recurring flooding on the main road at Terminal Kukup. This problem is no longer an occasional occurrence; it happens almost every time there is a big high tide. Each time, the main road is certain to be submerged, vehicles cannot pass, residents have to wait for the water to recede, and tourists travelling in and out through the Kukup Ferry Terminal are also affected. This area is the gateway to international tourism, a place where tourists from Singapore and neighbouring countries come to enjoy the beauty of Kukup and Tanjong Piai. When the main road floods and the water overflows, it is not only troubling to local people but also damages the image of the country's tourism. I also receive many complaints from residents that their vehicles are rusting because they are soaked in seawater, causing huge losses. Madam Chairman, the main cause is the rise of seawater during big high tides, and this problem has dragged on for years. The people have long been disappointed waiting for a solution. They deserve thorough action that is truly effective. I urge the ministry to immediately go to the ground together with technical agencies such as JPS and the local authorities (PBT) to study the matter and prepare short-term and long-term action plans. Madam Chairman, referring to Item 16800 – High-Priority Flood Mitigation Projects.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

The flood problem at the Pontian District Trade Centre in the new town of Pontian is also increasingly worrying. This area is the local economic hub. It is where small traders do business and make their living. However, every time there is a high tide, water overflows into the business area, the roads are submerged, customers find it difficult to enter, and local businesses are directly affected. Therefore, I often— I hope the ministry can carry out a thorough technical study to identify the main catchment areas causing the overflow. I also propose that the government build a barrier to prevent seawater from overflowing into this area. This measure needs to be implemented immediately so that losses and damage do not become more serious in the future. With the expertise that the ministry has, I believe we need to shift from a reactive approach to a preventive approach based on study data and long-term plans.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

I want to emphasise that the people of Tanjong Piai have waited far too long; what they want is immediate action and real solutions. I hope the ministry can give priority and special allocation to implement flood mitigation projects against high tide seawater in Kukup and also in Pontian in the near future. Madam Chairman, next I refer to Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. The next issue is the flooding in the Tanjong Piai parliamentary constituency. I will be frank, I am very disappointed because although the ministry states that various actions have been and are being carried out, including 18 small projects since 2022 and several more launched in 2025, flooding still occurs and is becoming more frequent. This year alone, before the monsoon season has even arrived, this area has been inundated, hit by floods three times. This is clear proof that the existing water diversion system has failed to function properly. If— I suspect that if it is left like this, by the end of this year, people will have to bear more suffering again. The recurring flood problems in the areas of Sri Gambut, Melayu Raya, Kampung Maju Jaya, Kampung Sri Menanti, Kampung Paya Embun and Peneruk have still not been resolved so far. All of these are high-risk villages that are affected every year. Is the ministry's interpretation that floods three or four times a year are still considered not urgent? Must we wait for the water to rise to chest level or shoulder level before it is considered critical? JPS Pontian has already submitted clear proposals. One, the Pontian RTB project worth 183 million. Two, the relocation of Sri Gambut residents worth 5.7 million and the special project for Kampung Maju Jaya worth 8.9 million. Everything has been completed on paper, but to this day there is no budget and no implementation. So, I want to know, honestly, what is the actual status of these projects now? This problem cannot be tolerated any longer; every time there is a flood, houses are submerged, property is lost, and the people suffer. We are not demanding anything excessive; what the people ask for is only immediate action. I urge the ministry to consider emergency allocations for short-term measures, without having to wait for the Rolling Plan 13 or the next big budget. Let it be done in stages, as long as the work begins. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Tanjong Piai. I invite the Honourable Member for Merbok.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Thank you, Madam Chairman. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Merbok would like to begin the debate by referring to Head B.33 Item 040400 – Malaysian Program Office for Power Electricity (MyPower Corporation). Merbok would like to know why only next year is allocated for this item? Merbok would like to raise the matter of the effectiveness of this MyPower Corporation, which is an agency established in 2010 to coordinate the reform of the national electricity sector. Although MyPower's mandate is to increase transparency and improve efficiency in the energy industry, the implementation of this reform remains unclear and does not show clear results. Next, Head P.33 Item 13500 – Dam Rehabilitation. An increase of 20 million. In Kedah, there are four dams, namely Ahning Dam, Pedu Dam, Muda Dam and Beris Dam. Merbok would like to know what the status of these dams is, and whether they are in good condition or need maintenance, because these dams are the source of the main rivers in the state of Kedah, which supply water to the water treatment plants that are also used by the states of Penang and Perlis. In the state of Kedah, the state's raw water resources are managed by the Kedah State Water Resources Board (LSANK) so that they always remain protected. Therefore, the Kedah State Water Resources Board has imposed a charge for raw water extraction on Syarikat Air Darul Aman (SADA) for every cubic metre used to supply treated water to the people of the state of Kedah. Penang also extracts the same water, even though it is on the Penang side. In this regard, it would be appropriate for the Penang State Government to make a payment in the form of payment for ecosystem services to the Kedah State Government. This is for the purpose of maintaining the water catchment areas as catchment areas, including maintenance and conservation along the Muda River, which will be able to guarantee a continuous and adequate supply of raw water for the needs of the people of the states of Kedah, Perlis and Penang.

Datuk Awang bin HashimPAS · PNPendangEN

Merbok, may I interject?

Ya.

Datuk Awang bin HashimPAS · PNPendangEN

Thank you, Madam Speaker. Thank you, Honourable Member for Merbok. I would like to touch briefly on

Datuk Awang bin HashimPAS · PNPendangEN

review this leasing again. Does Merbok agree that it does not affect something that we request based on the lease, namely to review it again after the agreement has ended? So, whether or not the sovereignty of the Kedah State Government, because this sovereignty (daulat), as far as I know historically, is a part of Malay literature, in which, in the history of Malay literature, this sovereignty was only for the King. So, those who did not yet exist at that time, mentioning this sovereignty is something that feels not right. Because this sovereignty is only for the King, according to Malay literature, in the history of the existence of sovereignty.

[Bangun]

Datuk Awang bin HashimPAS · PNPendangEN

So, how, if the sovereignty of the Kedah State Government were to make an application for a review, to discuss the leasing again.

Datuk Awang bin HashimPAS · PNPendangEN

It has not reached the stage, to the point of boldly wanting to take Penang and make it Kedah's right; that is not right, actually, to discuss the leasing.

Yang Berhormat.

Datuk Awang bin HashimPAS · PNPendang

Ya. Silakan.

Honourable Member, the rules of the House, Madam Chairman, the rules of the House, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Which one?

I refer to Standing Order 36(9)(c). Words likely to cause feelings of ill will or hostility

[Dewan riuh]

between one race and another race in Malaysia, or to contravene any condition in the Constitution. A condition in the Constitution. The Constitution of Malaysia recognises Penang as a sovereign state. I request that...

Datuk Awang bin HashimPAS · PNPendang

Dalam perkara...

Pendang, sit down. I am addressing the Madam Chairman, don't play games.

Datuk Awang bin HashimPAS · PNPendangEN

You have no right to tell me to sit down.

I am addressing the Madam Chairman.

Datuk Awang bin HashimPAS · PNPendangEN

You— I will not sit down.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Pendang.

Don't be rude.

Datuk Awang bin HashimPAS · PNPendang

You kurang ajar. [Pembesar suara dimatikan] You kurang ajar!

Mr Chairman (Puan Alice Lau Kiong Yieng)

Yang Berhormat.

Datuk Awang bin HashimPAS · PNPendangEN

[Unclear] [Microphone switched off]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Please sit down first.

What right do you have? [Speaking without using the microphone]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Pendang.

Datuk Awang bin HashimPAS · PNPendangEN

Article 167, one may apply to review again the mission that has... [Unclear] [Microphone switched off]

Read the Constitution [Unclear] [Speaking without using the microphone]

Mr Chairman (Puan Alice Lau Kiong Yieng)

Yang Berhormat

Datuk Awang bin HashimPAS · PNPendangEN

[Unclear] No problem. There is no against the Constitution [Microphone switched off]

[Unclear] [Speaking without using the microphone]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members, if you do not wish to sit down again, I will adjourn.

[Unclear] You have violated the Constitution. [Speaking without using the microphone]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member for Pendang.

Datuk Awang bin HashimPAS · PNPendangEN

He looked at me while I was speaking, and he said I was like that. [Microphone switched off]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

There is no need to raise this issue every time in the committee debate.

[Dewan riuh]

Thank you, Madam Chairman. I only want to state that Penang is a sovereign state, we have our own constitution. So, do not raise this issue repeatedly.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Yes. I have already warned.

This clearly touches on— thank you Madam Chairman, thank you Madam Chairman.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Madam Chairman, may I have a little more time?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

I will give one minute.

[Ketawa]

Poor thing. [Speaking without using the microphone]

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

I will give one minute.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Yes. Okay, thank you Chairman, yes, where was I just now?

[Laughter] Suddenly... [Unclear] gone. [Speaking without using the microphone]

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Okay, next, Item 10001500 – Minor Works of JPS, namely at state level, which has been restored with allocation after having no allocation last year and this year. This allocation is very important to ensure that small rivers, drains and ditches under the supervision of JPS are well maintained. And it can reduce the risk of flash floods that often occur in residential areas and villages if there is heavy rainfall.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Next, regarding coastal erosion, 15100. Merbok would like to thank the ministry for awarding the tender for the coastal erosion control project from Tanjung Dawai to Sungai Pial, which closed on 1 October last year, and I hope that good and reputable contractors are selected so that this project can be completed on schedule and wave erosion, coastal erosion, will no longer threaten residents there. Next, I want to discuss NRW as has been discussed and debated extensively by Wangsa Maju and also Kubang Kerian earlier. So, I request that their speeches be included in my speech earlier. And I think for 15200 – Improving, Beautifying, Cleaning and Treating River Water MASMA. I would like to draw attention to river sand mining activities that have damaged river ecosystems. If we allocate a lot of money to beautify rivers, sand mining activities will damage the ecosystem. In the past, the Muda River was where I played and bathed and played with my friends; it has been damaged. Even now, I am no longer

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

willing to bathe because the water looks like teh tarik. So, I think that is all, Madam Chairman. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Merbok. I invite the Honourable Member for Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you, Madam Chairman, for the opportunity given to me to take part in the debate on the Budget 2026, at the Committee stage of the Ministry of Energy Transition and Water Transformation. Before I begin my debate, I would like to take this opportunity this afternoon to thank my party leadership and the voters of Rasah who sent me here, because today marks exactly three years since the 15th General Election. Many of you have forgotten this. Some people talk about all sorts of nonsense, like Pendang. But we remember the party leadership and the voters who sent us, who gave us the trust and mandate to be here...

Tuan Cha Kee ChinDAP · PHRasahEN

...That is the appreciation owed to the voters. So, Madam Chairman, I will begin my debate. No rhetoric, okay. First point, 95000 – Non-Revenue Water (NRW). This is indeed a main topic under this ministry and something we must work on. We must step up efforts to reduce losses that run not in millions but in billions of Ringgit every year. I see that RM340 million has been allocated for this year's budget, far higher than RM233 million the previous year. However, I want to ask: is this RM340 million part of the RM2.5 billion mentioned by the Right Honourable Deputy Prime Minister II, who is the PETRA Minister, who said that in the Thirteenth Malaysia Plan (RMK13) RM2.5 billion will be allocated to reduce national NRW from the current 34.6 per cent to 28.8 per cent? If the RM2.5 billion is for five years, why is it only just over RM300 million this time? It should be, even on a pro-rata basis, RM500 million. I would like to request an explanation because this matter is very important. If we can do this matter as quickly as possible, it will reduce the losses caused by NRW. And I want to ask, out of this RM340 million, how much is allocated for Negeri Sembilan? Negeri Sembilan is not at the most critical level

Tuan Cha Kee ChinDAP · PHRasahEN

like Perlis, Kedah and Kelantan, but it is moderately critical to me because NRW is 35 per cent at present. Under Item 21000 – Negeri Sembilan Water Supply Scheme. Last year, RM46.8 million, this year RM16.2 million. I want to ask, what project is this? I understand there was a high allocation for the overall project, RM673 million for Negeri Sembilan water supply. So, why is next year's allocation so small? I request the government's explanation shortly. The next item, 16800 – High Priority Flood Mitigation Project, and also Item 16700 – Flood Mitigation Plan (RTB) and Urban Drainage. Both these items have allocations of more than RM2 billion, which is nearly half of the total RM4.8 billion development allocation for PETRA this year. I want to mention two rivers in my area specifically. The Deputy Minister answered in the Special Chamber last August, and I want to get the latest update. Integrated River Basin Development Plan, Linggi River Phase 5. The Honourable Member said at that time that, as of 29 July, the progress was 12.41 per cent, higher than the schedule of 11.86 per cent. What is the latest status? Okay, for that project, and secondly, Sungai Jijan under the Rasah Parliament as well. It was said at that time that the application had not been approved under the RMK12. So, the application from JPS for the government to upgrade the development or improve and enhance Sungai Jijan, amounting to RM100 million, was carried over to RMK13. What is the latest status? Please approve it quickly. Next, under Item 80000 – National Sewerage Project, RM249 million is allocated. If it is sewerage, IWK. I want to ask the government, why give such a high allocation to IWK? Does IWK not collect payments from the consumers involved? Please explain. And, the final point, Madam Chairman, I may take two minutes, which is Item 040300 – Electricity Bill Subsidy, RM55 million. We know there is a need to provide subsidies to the consumers involved. However, I want to mention this: I request the Energy Commission and also the PETRA Ministry to take note of one matter regarding the action by Tenaga Nasional (TNB) in cases of meter tampering. I want to say here, I do not encourage it, okay. As a responsible people's representative, as a legal practitioner, I do not encourage people

Tuan Cha Kee ChinDAP · PHRasahEN

to tamper with meters. That is not right, because when a meter is tampered with, it records less. We do not— what, we do not encourage it and it should not be encouraged. However, the issue is when TNB representatives, or sometimes representatives from the Energy Commission attend, they remove the existing meter, they replace the meter without being monitored or seen by the customer, the homeowner. I think this is unfair. After the meter is removed, TNB takes it back, and then says there was meter tampering that caused— what do people say— after that, they make a claim for more.

Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

I think this is one-sided. Ideally, the homeowner should be there. I am not saying it applies to all cases, but there are certain cases where the homeowner is not at home. Maybe they are working, they are out of the house, working and so on, but, please do not do it like that, wait. If it is true, because what will happen, I see that a few years back, TNB was quite lenient in discussing claims. Now, TNB has become very harsh and considers the consumer, the user, completely at fault. And I think if this is the way it is done, and deliberately to drag the customer to court, well, TNB is a big corporation, with many panel lawyers, but...

Mr Chairman (Puan Alice Lau Kiong Yieng)

Yang Berhormat.

Tuan Cha Kee ChinDAP · PHRasahEN

...Users— yes. Domestic users do not have the ability to hire lawyers. So, I request the attention of the Energy Commission...

Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

...Attention from the PETRA Ministry regarding the basic matter of users. These are the domestic users I want to mention. Yes, domestic units, yes, which are not involved in any bitcoin business just now, which have no connection with domestic businesses. That is all from me. Thank you, Madam Chairman.

Rasah, may I ask just for the record.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up. I invite the Honourable Member for Maran.

As-salamu alaykum warahmatullahi wabarakatuh, peace be upon you. Thank you, Honourable Chairman.

Chairman. Allow me to debate the budget at the PETRA Committee stage. I want to touch on several matters, the first being 03000 – Water and Sewerage Management, which receives an allocation of RM241.8 million, and 28000 – Sabah Water Supply Scheme, RM209.670 million. Now, we are facing elections in Sabah, and I have to speak up because I also have relatives in Sabah. Honourable Chairman, in Sandakan, the people are facing a very critical water shortage. The Sabah Minister of Public Works has informed that Sandakan's water requirement is around 190 million litres a day, but actual production is only 165 million a day, causing a deficit, or shortage, of 25 million litres a day.

Of 10 tube wells that should be supplying raw water, only two are functioning, producing merely three to 3.5 million litres a day. The state government has had to reactivate old tube wells that have been abandoned for a long time as an emergency measure to cope with the critical shortage of water supply. Five water storage tanks are only expected to be completed by July 2026, while the people of Sandakan and other affected areas are now facing a water supply crisis. How will the RM209.67 million Sabah water supply scheme be ensured to be truly used to upgrade treatment plants, restore tube wells and build water storage to overcome the increasingly critical water crisis? The water crisis at Universiti Malaysia Sabah (UMS), which affects nearly 20,000 students and staff, the Federal Government is carrying out a short-term intervention plan totalling one million, which will be implemented through cooperation between the Sabah State Water Department, PETRA and the university, as informed by the Deputy Prime Minister II. This measure is seen as temporary. What is more worrying is that there are about 12,000 squatter houses making illegal water connections, causing a loss of 18 million litres of water a day and affecting UMS. Suggestion, we would like to propose that the government allocate at least 60 per cent of the RM209.67 million directly to the restoration of critical assets such as tube wells, high-capacity water treatment plants and main storage tanks. Second, implement an urgent project to close the deficit in Sandakan, including repairing the eight damaged tube wells. Add portable water treatment modules

like those used in Kelantan while the major projects are completed. Third, upgrade the Kinabatangan River intake to increase minimum output by approximately 20 million litres of water a day within 12 months. Honourable Chairman, I would like to mention several other matters, namely 22000 – Pahang Water Supply Scheme. Improvement of water supply to Pekan Tajau, Kampung New Zealand and to Sri Jaya. Thank you for it being carried out. And I want to know, when will a proper water supply be provided to the villages involved, including Kampung Awah, Pekan Tajau and so on? I also request that the government pay attention to the replacement of old pipes that are still present in the Maran area, in the Pahang area, in the state of Pahang and especially in this Maran area. I also want to propose that the work to upgrade the Bukit Kertau water treatment plant, which was proposed previously at a value of RM36.5 million, be implemented immediately. I also want to propose that the construction of a water supply for Kampung Orang Asli Paya Taman, valued at RM1.76 million, be implemented immediately because this village is very left behind. And the next is water supply to Kampung Kuala Wau, Kampung Orang Asli Embus and the upgrading of the water treatment plant and pump house that I mentioned earlier, valued at approximately RM15.6 million. Dato' Chairman, 030500 – Department of Irrigation and Drainage, allocated RM133.126 million. I want to ask JPS, the flood mitigation that we requested earlier, roughly RM25 million, which should have been implemented in the urban area of Maran involving flood-prone areas, I understand, I have been informed that only RM12 million was spent, whereas the river in front of the Maran town has still not been upgraded. I request that the Drains and Drainage Department, in expediting this implementation, ensure that the town of Maran will not be submerged should flooding occur in the future. Thank you, Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Maran. I invite the Honourable Member for Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Madam Chairman. I begin with Item 64000, 30100 relating to the Johor state water supply scheme. Recently, for five days in Johor Selatan, once again we

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

faced a sudden disruption of water supply, which this time involved four districts, including the districts of Johor Bahru, Kulai, Kota Tinggi and Pontian. More than 455,000 account holders, including over one million people, were affected by raw water pollution caused by sand quarrying activities in Sungai Sayong, which is a tributary of Sungai Johor. Many areas were involved, including the area of the Deputy Minister himself and also in Tebrau, where the impact was very severe, Madam Chairman. For example, in Taman Nora in the Tebrau area, residents had to use rainwater to bathe. And in the interior area of Sungai Tiram, residents had to bathe by the riverside because of this water disruption. This incident exposed a significant weakness: the absolute dependence of the Johor Selatan water supply system, which relies only on one main source, namely Sungai Johor. When pollution occurs— this is not the first time. This has happened many times. The entire water supply system in southern Johor suddenly gets cut off, and the Deputy Minister once answered in Parliament that Johor uses nearly 16 million gallons of water every day. Until now, we are still unable to be self-reliant. In Johor Selatan alone, our daily water use is more than 1,000 million litres a day and our reserved buffer is negative. This means every day we are not only short, we have to buy water from Singapore. Although under the 1962 Water Agreement, we are allowed to buy five million gallons a day, in fact we now buy nearly 16 million gallons a day, or equivalent to 60 million litres a day. So, my question to the ministry is...

Tuan Hassan bin Abdul KarimPKR · PHPasir Gudang

YB Tebrau.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Yes, yes, yes.

Tuan Hassan bin Abdul KarimPKR · PHPasir Gudang

Boleh?

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Yes, yes. Please, Pasir Gudang.

Tuan Hassan bin Abdul KarimPKR · PHPasir GudangEN

Thank you. Thank you, Madam Speaker. Regarding the water supply in Johor Selatan, I have been informed and I have seen for myself that there are too many data centres, foreign investment data centres, concentrated in Johor Selatan. These data centres require a very large quantity of water. Is this a challenge to the water supply in Johor? Thank you.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Yes. Thank you, Pasir Gudang. I very much agree with the view of Pasir Gudang and I will come to this topic shortly, Pasir Gudang. So, my question to the ministry is, what is the

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

long-term plan for us to resolve the water issue in southern Johor? What I currently understand and know is that we now have the LRA Layang Project Phase 1 and Phase 2, which until now have still not been completed. I understand that when it is completed, it will be able to contribute 276 million litres a day. But, can the Minister give a little update, what is the latest status? What Pasir Gudang said is true. We see that there are so many data centres in Johor. Now there are nearly 30 data centres in operation, and their daily water consumption is 50 to 70 million litres a day. I want to ask the Minister, during the recent water crisis— I want to ask this, the people are suffering, there is no water. I want to know, did the data centres still get water? Did they continue to receive their water supply even though for these five days the people had no water? That is very important to me. I hope the Minister can give a little answer. The second issue I want to raise— a little more, Madam Chairman. Through the Free Malaysia Today report of 28 October 2025, a case was reported in which a factory worker was sued twice by TNB on allegations of stealing electricity and modifying the meter. The Kuala Lumpur Sessions Court not only dismissed TNB's claim, but also ordered compensation of RM30,000 to be paid to the defendant for the emotional suffering he had experienced. What is more shocking, investigations showed that this factory worker was not the owner or tenant of the premises and had never opened a TNB account in his name. His identity card had been reported lost since 2017 and he had made a police report.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

What can I say, it's simple. Madam Chairman, many ordinary people come to see me, and in my capacity as a lawyer, I have many cases where ordinary people come and say they were suddenly sued by TNB. Not a few. TNB uses a system where they claim five times the amount they suspect was stolen. The problem is every time, almost every time it goes to court, TNB loses. So, I think we need a more equitable mechanism for consumers. Because TNB is rich. It can go to court to make claims, but the people have to find lawyers for all that. That is why I say that, as the regulator, the Energy Commission (ST) must play a role. ST must screen first. We cannot allow TNB to take cases directly to court. What ST can actually do is, before TNB goes to court, both parties must go to ST first,

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

set up a unit where ST will first screen whether this case has merit, whether this case is strong, and only then can the case go to court. Otherwise, this is very unfair to the people. Last of all, I want to raise just one issue, which is...

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Member, be brief.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

30 seconds. Flood mitigation plan in my area, Item 16700. Minister, the government two years ago already allocated RM41.8 million for RTB in the Tebrau area, especially in Kangkar, Tebrau. But until today, the wall that was said to be built three metres high has still not been seen. So, I want to ask, what is the latest status? That's all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Tebrau. The Honourable Member for Masjid Tanah is not in the House. I invite the Honourable Member for Lubok Antu.

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Thank you, Madam Chairman. Lubok Antu requests to take part in the debate on Head B and P.33 of the Ministry of Energy Transition and Transformation (PETRA). I go directly to the first item, namely 13900 – Flood Control and Flood Warning System Scheme, amounting to RM22.7 million. Madam Chairman, Malaysia also feels the effects of global climate change. Every year, natural disasters such as major floods, landslides and increasingly extreme weather conditions occur more frequently. In the Lubok Antu area, for example, flood and landslide incidents increased from 13 to 16 incidents in 2025, with the majority of incidents occurring during the northeast monsoon between January and March. Therefore, I want to ask, to what extent is the flood control and flood warning system scheme effective in Sarawak, especially in rural and interior areas? And, will the ministry evaluate the implementation mechanism of flood control and flood warning systems in high-risk areas prone to floods and landslides in Lubok Antu, taking into account the constraints in terms of telecommunications in several areas upstream of the rivers?

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Residents of villages and longhouses in upstream river areas, in particular, are greatly affected by the danger of unpredictable rises in water levels and the risk of landslides, especially in hilly areas. Furthermore, Madam Chairman, under Item 15200 – Improving, Beautifying, Cleaning and Rehabilitating River Water and MASMA Infrastructure, RM281.8 million, and Item 15400 – Environmentally Friendly Drainage River Management Plan, RM90 million. I would like to ask for an explanation: how can these allocations be utilised in rural areas such as Lubok Antu? I would like to request that the ministry carry out cleaning works at several river mouths in the Lubok Antu area. The rivers affected are Sungai Ulu Engkari, Sungai Ulu Delok and Sungai Ulu Batang Ai. For Madam Chairman's information, there are many piles of logs stranded at the mouths of these rivers, and they are very dangerous to residents who use longboats to travel along the rivers. Therefore, I hope the ministry can provide allocations under this budget to carry out cleaning works in the affected rivers, in order to improve the cleanliness and flow of the rivers in the area. This environmentally friendly drainage approach is very important for the sensitive Ulu rivers, especially Sungai Engkari, Sungai Delok and Sungai Batang Ai. I hope the ministry can consider river bank rehabilitation, erosion control and nature-based solutions for longhouse areas exposed to flooding and erosion. Furthermore, Madam Chairman, I would like to raise Item 15000 – Minor Works JPS (Department of Irrigation and Drainage), Various States, amounting to RM81.7 million. Madam Chairman, I would like to request an explanation of what minor works are meant under this item, and how much will be allocated to Sarawak? In addition, I would also like to ask whether JPS has a specific plan to improve the drainage and drain systems in Lubok Antu, particularly in longhouse areas? This is because, Madam Chairman, most of the drainage systems in longhouse areas were built by the JKK (Village Development and Security Committee) themselves through gotong-royong. Maintenance and cleaning works are also sometimes carried out by the villagers themselves. Accordingly, I request that JPS upgrade the drains and drainage system along critical road alignments, such as Jalan Tanjung

Tuan Roy Angau anak GingkoiPRS · GPSLubok AntuEN

Lipat to Lidong, so that rainwater can be drained more effectively. Existing drains should be upgraded with a higher profile, deeper and wider, because current capacity is no longer sufficient. Madam Chairman, several high-risk areas require urgent attention to ensure the safety of residents, especially those involving drainage and high-ground risk. Inadequate drainage, for example, has been detected at locations such as Jalan Tanjung Lipat–Lidong, and this also affects settlements and schools in Lipat Ulu, Sungai Lipat, Kejemut, Tabut and Tabut Ulu. Meanwhile, along Sungai Kesit, which is near the longhouses, the area often experiences sudden rises in water levels during continuous rain. Apart from drainage issues, Madam Chairman, landslides also frequently occur as a result of inefficient drainage, as happened recently at Jalan Ulu Skrang, at Sedarat Simpang and Stuga. For information, areas such as Jalan Sayat–Bukong and Jalan Ulu Skrang are the main access routes for residents to the town, and these routes have a record of landslides that have cut off links between longhouses and schools. I therefore wish to ask: what steps or plans has JPS taken to address the problems of drainage, landslides and flooding in an integrated manner to ensure the safety of residents in the Lubok Antu Parliamentary constituency? That concludes my debate, Madam Chairman. I hope the ministry will consider all the proposals I have put forward. Thank you, Lubok Antu respectfully supports.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Lubok Antu.

Tuan M. Kulasegaran a/l V. MurugesonDAP · PHDeputy Minister in the Prime Minister's Department (Law and Institutional Reform), · Ipoh BaratEN

Madam Speaker, with your permission, I would like to make a brief request. I would like to welcome the presence of the Merpati Manjung Welfare Association, Perak, led by Jason Lim. For the information of Madam Speaker, they are all from my village in Sitiawan. I thank... [While making hand gestures] all of you, my old gang. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The Honourable Member for Pasir Puteh.

Assalamualaikum warahmatullahi wabarakatuh and good greetings. First, I would like to extend a welcome to the official government delegation from the Islamic Republic of Iran who are with us here. [Applause] May the diplomatic relations between Malaysia and the Islamic Republic of Iran always be well established, insya-Allah. Ahlan wa sahlan wa marhaban bikum. Welcome to Malaysia. Dato' Speaker, first, I would like to touch on Item 13400 concerning the development of national water resources. One of the responsibilities and obligations borne by the Ministry of Water Transformation in our country is to create national water resources. I hope the ministry will ensure that water sources, whether through rivers or underground, the water available underground in our country, which is very abundant, is activated in our country so that states that do not have a clean water supply can be resolved within our country. I would like to touch on Kelantan, Sabah, Sarawak, and many others, even Pahang – in Pahang, everywhere. Our water sources are abundant, and I hope the ministry will give good focus to this.

The second is under Item 14500 – Upgrading Urban Infrastructure and Drainage, Flood Mitigation. Many towns in our country sink when the flood season comes. Among the towns that sink is Pasir Puteh. The losses borne by the people, I do not know how to say how many hundreds of millions each time the flood season comes. So, many of these towns do not have major drainage, which is the responsibility of the Ministry of Energy Transition and Water Transformation. It is not the responsibility of local authorities, the large drainage that reaches the rivers. So, I ask the ministry to take note. And I have already mentioned this since the previous term, what happened in Pasir Puteh. Once it sinks, Dato' Speaker, tens of millions of the people's property, houses that sink, electrical goods all sink together. So, I very much hope the ministry will resolve this issue.

Under Item 15100 – Coastal Erosion Prevention. When we speak of coastal erosion in our country, it is the states on the East Coast. In the East Coast states, if in Terengganu, in Kelantan – in Kelantan the coastline has eroded almost, I think, 30 metres, 40 metres, and is already in the sea. There are land titles belonging to the people, that land. Now it no longer exists. Only the title remains. The title is in the sea. So, all of this is our shared responsibility to resolve together. Under Item 15200 – Improving, Beautifying, Cleaning and Rehabilitating River Water and MASMA Infrastructure. Under this item, the issue of cleaning and treating water is also a very big matter, very important. The allocation involving RM2,759,000 provided by this government, I hope it can treat well. And I want to ask, for the water treatment carried out, does it involve existing water treatment plants? Or will the government establish water treatment plants in other places? If I want to focus on Kelantan, how many new places will be treated by the ministry so that the people in our country can enjoy a good water supply. 15400 – Environmentally Friendly Drainage River Management Plan. In terms of its language, it is very good. Environmentally friendly, environmentally friendly drainage. But when I walk around everywhere, it is very un-environmentally friendly. The existing drains are not maintained. Often these drains are completely covered, closed. So, I ask the ministry to take on this role. And finally, 16800 – High-Priority Flood Mitigation Project. High-priority flood mitigation. In this House we have mentioned many times in Parliament at Rantau Panjang, at Pasir Mas, including my area of Pasir Puteh, which always faces the northeast monsoon season. Moreover, now we are very close to the northeast monsoon season. So, there is none, it seems there is no concrete, big project that we can carry out to save the people's property. Thank you, Dato' Speaker, for giving me the opportunity. That concludes my speech, wabillahi taufiq wassalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Pasir Puteh. Honourable Members, the House resumes as the Committee of Supply. [The House resumed as the Committee of Supply]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

[The Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the sitting is suspended and will resume at 2.30 p.m. Thank you.

[The sitting was suspended at 1.05 p.m.]

[The sitting resumed at 2.30 p.m.]

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

[Mr Speaker chaired the sitting] [The House sat in Committee] [Mr Speaker chaired the Committee]

Mr ChairmanEN

Thank you. We continue the debate under the Ministry of Energy Transition and Water Transformation at the Committee stage, and we begin with Masjid Tanah. Five minutes, Masjid Tanah.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

Thank you, Tan Sri Chairman. I would like to continue directly to Item 16700 – Flood Mitigation Plan, and coincidentally the Honourable Deputy Minister is also present, and I still remember the answer in the Chamber, Honourable Deputy Minister, the Honourable Deputy Minister, you had closed your eyes. So, the Honourable Deputy Minister said that TAPS Jernih would be completed in the second quarter of 2025, but until today I am informed that, as a result of the inspection, it still has not been completed. So, I very much hope, I would like to know what is the latest status, in detail, and how much late EOT must be paid by the company to the ministry due to the delay that has occurred? And what are the implications of that delay? And next, I would like to continue to Item 15100 – Coastal Erosion Prevention. So Mr Speaker, the issue of coastal erosion is no longer an ordinary threat. Today, it has already happened as a result of development and also reclamation projects that have not been comprehensively assessed, and I would like to draw attention to one specific issue in Melaka, namely the coastal reclamation project from Teluk Gong to Pantai Pangkalan Balak, which

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

has already caused serious erosion all the way to Kampung Tengah, Kampung Kuala Sungai Baru, and as a result of our survey, we went down and also met with the fishing community and so on. So, we see that reclamation in this downstream area has already changed the flow of sea currents, and it has also caused very severe erosion in Kampung Tengah and Kuala Sungai Baru. It has also resulted in loss of land, deterioration of settlement areas and also a threat to the safety of residents' homes, and it has even caused damage to coastal ecosystems, and when this reclamation is carried out without comprehensive mitigation, the waves that are diverted eventually strike other areas, reaching Kampung Tengah, and the surrounding areas become victims. So, I also found that there is a lack of breakwaters between Kampung Tanjung Dahan and also Kampung Hilir. So, I hope the ministry can consider and also look into this matter. Next, I would also like to touch on, under the same heading, the coast reclaimed along Pangkalan Balak. It was done on safety grounds, a fence all around from Sungai Tuang up to Padang Kemunting. So, we see that today customers, people, can no longer enjoy going down to the beach and the sea at Tanjung Bidara, Pangkalan Balak and so on. So, we see that there are already operators whose area has been reclaimed for nine months and still cannot use the beach. So, if we look at the issue of sea reclamation along Pangkalan Balak, it has already affected livelihoods. Most of those who live around, including operators, including owners of chalets and related hotels, while we know that this project is necessary to prevent erosion, when there is no engagement session, I met with the Honourable Deputy Minister, and I also emphasised the matter of an engagement session. It is true that one was called on 22 October, but he picked, just picked. He chose selectively who would be called to the engagement session. Just do it, just do it, okay. Once met, ah, that's enough. It cannot be like that. All of them should be called, the operators or the communities involved, so that they can give their views to the ministry and the relevant agencies. This is not the case, when only those selected are called, so the information or input that should be obtained is not obtained. Hence,

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

properly. And from the visit too, I saw that 70 per cent of the losses have been suffered by restaurant operators, food stall operators and chalet operators, and these are 100 per cent Bumiputera who depend on weekends and school holidays for profit. Imagine one stall that doesn't reach RM100 in sales by the weekend, Tan Sri Speaker. How are they to send their children to school, support their families and so on? I feel very sorry when I hear their lamentations, and not only that, Mr Chairman Speaker, they have also been threatened, "If you raise this matter to the above, you're finished". Because in most of the areas there, the 70s and 80s, we also know Pantai Pangkalan Balak and Tanjung Bidara used to be, used to be— in Melaka, the only place where you could swim was near Masjid Tanah. Other places could not be swum in. So, when such things happen, they feel very saddened. So, I want to know why. They ask why it was done at the end of the year? The time when they can earn multiplied profits, which can cover the months when there are no tourists coming from outside. So, they are very disappointed about this. And next, I want to know when this project will be completed? When will this project be completed, because we want to know what the plan is, and I really hope that, as a result of my meeting with the community and also the chalet, stall and restaurant operators, they very much hope that a real dialogue session can be held, and that all parties can be called. I very much hope the ministry can arrange that, and I also want to be present at that dialogue session. And next, it's nearly over. Finished. So, my last point, Tan Sri Speaker, because after this I want to go to the PAC. So, last point. For Melaka, NRW Melaka. Melaka is the most critical state in terms of water supply because its sources are limited. So, if we look, there are several challenges and also solution issues that must be addressed. Raw water sources are limited. Some states, for example Melaka, have to buy raw water from Johor. So, internal water is not sufficient. So, the Jernih Dam project needs to be expedited to guarantee sufficiency of raw water. So that is why TAPS Jernih is very important. So, I would like to propose that raw water be managed under one system through the body

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

regulating water in each state, to ensure all water operators have sufficient raw water to be processed. NRW management must be streamlined and strengthened with good water pressure management skills, by expediting the project to replace old pipes. And next, since water operators are under state government authority, it is important that water operator organisations be headed by a person competent in water management, so that the objectives of water pressure management and other matters contributing to NRW can be implemented efficiently and not merely depend on political appointments.

Datuk Wira Mas Ermieyati binti SamsudinBERSATU · PNMasjid TanahEN

So when people who are not competent are placed there, they cannot see to troubleshoot the problems that occur, and this must be looked at within Syarikat Air Melaka Berhad. I hope this receives attention from the ministry and the Honourable Deputy Minister himself. I thank the Honourable Deputy Minister for coming to Masjid Tanah many times to look at the TAPS, although he did not tell me, if he had told me I would have had to treat him to a drink, but thank you once again, Honourable Deputy Minister. Do come again to look, so that they can get it completed quickly. Thank you.

Mr ChairmanEN

Alright, thank you. Next, I invite Beruas.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Thank you, Tan Sri Chairman, for giving me the opportunity to debate at the Committee stage of the Ministry of Energy Transition and Water Transformation. I would like to raise two matters under the Department of Irrigation and Drainage (JPS) under Item 030500, and one matter under Energy Management under Item 020000. Regarding the Department of Irrigation and Drainage, I understand that the estuary of the Beruas River at Pantai Remis in my constituency is under JPS's supervision. All this time, the fishing jetties at the mouth of the Beruas River have been protected from the waves by a natural barrier, namely mangrove trees. However, over the past few years, the waves have destroyed some of these mangrove trees, and now it has become dangerous for these fishing jetties because large waves will strike directly into the fishing jetties in the Pantai Remis area. I urge JPS to

Dato' Ngeh Koo HamDAP · PHBeruasEN

build barriers to protect these fishing jetties and also to protect the mangrove trees that remain. The second matter is that I thank the government, through JPS, for allocating RM36 million to overcome the flood problem in the Beruas area. Unfortunately, I have been informed that the projects implemented are not located correctly and do not overcome the flood problem. Based on the views I have received, the estuary of the Beruas River should in fact be cleaned from the estuary upstream, but what is happening is that the projects are now being carried out at the upstream part of the Beruas River, and indeed the downstream Beruas River has been cleaned, and the money has been used to acquire land to build water retention ponds. So, when heavy rain occurs, the water of the Beruas River cannot flow quickly, causing floods to continue to occur. I request that, if possible, the projects be reconsidered if the location is not suitable. Could the remaining funds be used to clean the estuary of the Beruas River and the Beruas River itself? The final matter I wish to raise concerns energy management by TNB. I have been informed by the Manjung Municipal Council that when local authorities request TNB to relocate TNB poles so that local authorities can widen roads that need to be widened, TNB asks the local authorities to pay the cost. This means that with limited financial constraints, the local authorities are unable to do it. I feel that TNB should, if the project is for public interest, not ask local authorities to pay. If local authorities were to ask TNB to pay land tax or rent on all these TNB poles, I feel that would be even more detrimental to TNB. I request that two locations of poles be relocated. I hope TNB can relocate them without asking for costs from the local authorities. One location has three poles in the Ayer Tawar area, namely poles TSIFPA 33, 34 and 35, and another location where six poles need to be relocated is at SJK(C) Uk Ing, Kampung Cina, namely poles TK19 to TK24, so that road widening can be carried out. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Alright, next I invite Temerloh.

Assalamualaikum warahmatullahi wabarakatuh and good day. Thank you, Mr Chairman. Temerloh refers directly to Item 030500 – Department of Irrigation and Drainage (JPS). Mr Chairman, for 2026, the allocation to JPS has increased by 11.1 per cent. Will this increase truly translate into high-impact projects, or merely expand operating costs? Temerloh wishes to voice the need for drain cleaning in Taman Zabidin, Mentakab, because cleaning has not been carried out for a long time on the grounds of no budget. This drain, from the Mentakab market, is dirty and not only causes flooding when continuous heavy rain falls, but also causes animals such as snakes and monitor lizards to come up and enter the homes of nearby residents. Temerloh hopes that a budget can be provided to resolve this issue, which has not been maintained for years. Item 15000 – JPS Minor Works, Various States. In 2025 there was no allocation, but for 2026 it has soared to more than RM81 million. The increase is 100 per cent, a sudden large allocation. Why has there been such a sudden large surge without any comparison basis with the previous year? What projects require this additional allocation of RM81 million? Are these new projects, or are they actually projects from previous years that have been transferred to this heading? How much budget has Pahang received, especially in Temerloh, because many residential areas need JPS minor works? First, repair and cleaning of the drainage system involving the cleaning of clogged drains, sediment drainage aimed at reducing flash floods and improving water flow. Mr Chairman, Item 16800 – High Priority Flood Mitigation Projects. An increase of about 51.3 per cent. Has the government identified flood mitigation projects that have been delayed, to the extent that they require an increase of more than half a billion ringgit, and what is the assurance that this time the projects will not experience delays like previous flood mitigation projects? What is the progress and status of flood mitigation for the Semantan River, Temerloh, and when is this project expected to be completed in full? Item 22000 – Pahang State Water Supply Plan. Mr Chairman, the allocation for 2025 was more than RM24 million, but for 2026 it has drastically dropped to just over RM1 million, a decrease of nearly 94.8 per cent. Why has

such a huge reduction occurred for the state of Pahang? Are the projects nearly complete and there are no water supply problems in Pahang? How does such a reduction affect the needs of Pahang's people who still face water supply problems? Temerloh has heard many complaints about unresolved water problems, including in Kampung Sanggang Seberang; Kampung Bolok, Lanchang; Kampung Lebak Seberang; Kampung Simpang Sanggang; and orang asli villages and many settlement areas that are also affected by water problems. At the same time, the state of Pahang has taken loans totalling more than 50 million, while there are states that have not taken any loans, such as Negeri Sembilan and Perak. Are these loans related to renewable energy projects, or infrastructure upgrading for water supply?

Temerloh wants an explanation: what monitoring mechanism will ensure this budget is used efficiently and responsibly? In Temerloh, the clean water supply problem remains unresolved due to frequently burst pipes, small pipelines, and pipes that are 40 years old. Water treatment plants lack capacity or are dilapidated, and there are disruptions caused by natural factors such as floods and droughts. Are solutions being carried out, including large allocations to upgrade infrastructure, build new plants, and implement emergency plans? What is the status of the Mempateh Water Treatment Plant, which was said to be completed in 2025 at a cost of RM100 million? What are the solutions for resolving the clean water supply problem for short-term and long-term periods in the places and areas involved, including low water pressure, especially in Temerloh? Overall, water problems continue to plague the people of Temerloh, as well as other Parliaments in Pahang, because previously this problem seemed to be associated only with the state of Kelantan. Mr Chairman, I want to mention something related to the matter — because time is running out. I move on to another related item, 40000 – Energy Efficiency and Renewable Energy Programme. The allocation has drastically decreased from RM24 million to only RM10.88 million for 2026. First of all, what is the government's justification for cutting more than 50 per cent of a programme that is a major pillar for the country in achieving its carbon neutral target

and enhancing energy security? Does the government see that this green energy agenda is no longer a priority? Second, will this cut affect the development of solar energy, the government building retrofit programme or energy-saving initiatives for the people? Which projects or components of the programme will be stopped or reduced? Third, in a situation where people's electricity bills are rising and subsidies are increasingly targeted, would it not be more appropriate for the government to increase investment in energy efficiency, not cut it, to help people reduce their consumption and electricity costs? Does this cut reflect weaknesses in the government's own planning, or does the government in fact lack commitment to the clean energy agenda that is so often proclaimed? I urge the government to provide a detailed explanation so that the people know the true direction of energy policy. Finally, Mr Chairman, the people need transparency. When there are allocations that rise sharply, others drop drastically, and there are loans that the state does not use, it gives the impression that planning is inconsistent. Priorities are unclear and budget distribution may not be aligned with the actual needs of the people. Okay, thank you.

Mr ChairmanEN

Alright. Next, I invite Puncak Borneo.

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Tan Sri Chairman, I go straight to Item 13900 – Flood Warning and Alert Scheme; Item 15000 – JPS Minor Works, Various States; Item 15200 – Improvement, Beautification, Cleaning and Treatment of River Water and MASMA Infrastructure; Item 15300 – River Mouth Dredging; Item 16800 – High Priority Flood Mitigation Projects; and Item 29000 – Sarawak State Water Supply Plan. I respectfully request the government's goodwill and the Ministry of PETRA (Ministry of Energy Transition and Water Transformation) to allocate funds for flood mitigation works, drainage, river mouth dredging and the installation of a flood early warning system, with permission, also known as EWS, in the Puncak Borneo Parliamentary area, such as in Kampung Lintang Baru, Kampung Sebemban, Kampung Maang, Kampung Sungai Rich'ard, Kampung Simpoh, Kampung Tarat Melawi, Kampung Tarat Sibala, Kampung Siniawan Seberang, Kampung Keranji, Kampung Sogoh, Kampung

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Tringgus, Kampung Belimbing, Kampung Bijure, Kampung Bratan, Kampung Merabak Asah, Kampung Sikong, Kampung Simboh, Kampung Giam Baru, Kampung Jambuk and also Kampung Benat. All these areas require attention because they are often hit by floods and also need flood mitigation. In addition, I also extend thousands of thanks to the Ministry of PETRA for providing funds for the implementation of the National River Corridor Project, or DSK, at Kampung Stabut with a ceiling cost of RM500,000, which has been completed. Following this success, I once again wish to request that the National River Corridor Project be implemented at the river corridor of Kampung Sipok and Kampung Bratan. If this project is approved, it can clean, maintain and beautify the rivers at Kampung Simpoh and Kampung Bratan, which often hold river festivals and community kayaking activities, and indirectly create local economic opportunities. I also urge that the Landeh Water Treatment Plant Project, which has been approved, be tendered and built immediately for the sustainability of treated clean water supply in Kuching, including the Puncak Borneo Parliamentary area, which will receive a positive spillover. Tan Sri Chairman, returning to the flood problem, it is very important for dredging and excavation works in river areas and river mouths. High priority flood mitigation is needed because direct economic losses are very high. According to the DOSM and also NADMA report, losses due to floods in 2024 were estimated at RM933.4 million. That is equivalent to about 0.05 per cent of Malaysia's nominal GDP. The loss components include residential RM372.2 million, public infrastructure RM303.4 million, agriculture RM185.2 million, business premises RM54.1 million, vehicles RM17.3 million and the manufacturing sector RM1.2 million. Therefore, we need to take action and adaptation measures such as flood-resilient infrastructure, flood warning systems, and building zoning regulations must be in place. The economic impact can be reduced by more than 40 per cent. According to the same report, the cost of adaptation is estimated at 0.2 per cent of annual GDP. Thus, this shows that flood prevention investment is very cost-effective. Losses due to floods were once estimated at RM5.3 billion to RM6.5 billion according to the Malaysia Insurance Highlight Report. The DOSM report also shows that floods in 2021

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

caused economic losses of approximately RM6.1 billion, which is about 0.4 per cent of GDP. Tan Sri Chairman, I want to land. Therefore, when we look at these data, Tan Sri Chairman, it is very worrying. Our country must take action, move quickly and learn from Japan and the Netherlands, where they have been very successful in managing flood disasters effectively and efficiently. Japan is considered to have the most effective flood warning system in the world and has a very accurate flood prediction system. Real-time monitoring, advanced technology, a warning communication network that reaches all levels of society, and a culture that keeps the public highly alert. Therefore, Tan Sri Chairman, I fully support all the items of the Ministry of PETRA's budget so that the people's problems can continue to be protected. Thus, thank you. May God bless. [Applause]

Mr ChairmanEN

Alright. Thank you. Next, I invite Tanjong Karang.

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

Thank you, Tan Sri Chairman. Tanjong Karang wishes to draw the attention of this august House to two critical items under the Ministry of Energy Transition and Water Transformation that have direct implications for public safety, especially coastal and urban areas affected by floods.

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

I go straight to Item 15100 – Coastal Erosion Prevention. The Budget 2026 is valued at RM1.724 million, while for 2025 it was RM2.251 million. Here we see a very drastic decrease, about RM52.67 million or 23 per cent. Tan Sri Chairman, this sudden decrease is nearly a quarter of last year's allocation. This is very worrying. In fact, Malaysia now faces coastal erosion rates of between 0.5 metres and one metre per year in several states such as Perak, Terengganu, Sabah, and also including Selangor, especially in Tanjong Karang itself. Many coastal communities depend on coastal protection for the safety of homes, schools, village roads and agricultural areas. Among them is the coastal village of Sungai Kajang, Tanjong Karang. 250 residents are always anxious about floods from the sea whenever high tides occur, due to the breach of coastal embankments that were built without a breakwater

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

Question: what is the basis for this 23 per cent reduction when more than 30 per cent of the country's coastal areas have been categorised as critical by JPS itself? Second, breakwater projects, coastal embankments and ecosystem restoration such as mangrove planting are still largely incomplete. This includes the coastal embankment at Sungai Kajang that is being built without this breakwater. Will its allocation also be cut? What about the cost of construction materials, which have been consistently increasing since 2023? Tan Sri Chairman, next, under Item 16700 – Urban Flood Mitigation and Drainage Plan. The allocation has increased to RM1.1361 billion compared with RM804 million in 2025. Looking at this, there is a significant increase. This shows the government's focus on urban flood problems, but several questions need to be clarified. The first is whether this allocation is truly channelled to the most critical areas. The JPS report states that more than one hundred urban flood hotspots in the Klang Valley, Penang, Johor Bahru and Ipoh are mostly due to drainage systems that are more than 30 years old. In this regard, Tanjong Karang requests that the Sungai Tengi, Tanjong Karang flood mitigation project, valued at RM45 million, be included in the nearest RMK13 rolling plan with immediate effect so as to protect the town of Tanjong Karang from recurring flash floods. Tanjong Karang also wants to know whether the majority of this allocation is truly used for drainage modernisation and not merely conventional mitigation projects that do not address the root causes. Second, to what extent is project 16700 aligned with climate change projections? Extreme rainfall distribution has increased by nearly 40 per cent compared to the previous decade. Therefore, flood mitigation system design must use RCV align standards, with design taking into account future climate change data. Not following old standards that are no longer relevant today. Third, the issue of project delivery. Many previous flood mitigation projects were delayed due to design changes, tender screening, and coordination with local authorities (PBT). I would like to ask how many 2025 projects under 16700 are still incomplete and extended into 2026. Finally, Tan Sri, although the allocation has increased, Item 15100 Coastal Erosion Prevention has been cut by 23 per cent. This raises the question of whether the government is balancing the budget by sacrificing coastal protection, which

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

is also closely linked to flood risks, such as for us in the town of Tanjong Karang, who are affected by sea floods when high tides occur and floods from the Sungai Tengi river when heavy rain falls. I hope the ministry can provide a detailed explanation and ensure that this large allocation truly makes an impact on high-risk areas. Thank you, Tan Sri.

Mr ChairmanEN

Alright, I invite Tenggara.

Tan Sri Pengerusi, I was waiting for Tan Sri Pengerusi to take his seat before I raised this matter on Standing Order 36 before the next debate. 36(9)(c). "Perkataan-perkataan yang harus menaikkan perasaan bersakit-sakit hati atau bermusuh-musuhan di antara satu kaum dengan kaum dalam Malaysia atau melanggar mana-mana syarat dalam Perlembagaan atau Akta Hasutan". Tan Sri Pengerusi, we all accept Pulau Pinang. I have had to stand up because this matter has been repeated several times, especially by the Honourable Member for Pendang. Although he has been suspended and has been warned, and I believe a motion is still being considered regarding the statements he made about Kota Melaka and Hulu Langat, he now plays yet another polemic. Kedah has rights over Pulau Pinang. I know that our Constitution recognises Pulau Pinang as one of the states in the Federation of Malaya, the Federation of Malaysia. So, I seek guidance from Tan Sri Pengerusi, so that we debate PETRA at the committee stage. Just now, I also believe that the Members of Parliament on the other side were surprised when Pendang suddenly came in and interjected, with no connection to the issue of Pulau Pinang and Kedah being raised. So, I ask for guidance from Tan Sri Pengerusi so that Pendang is told once again, even though we are already sick of his antics in Parliament, where he repeatedly makes statements against me, against Hulu Langat, against Kota Melaka and now wastes time by starting a polemic about Kedah and Pulau Pinang. Tan Sri Pengerusi, I am from Pulau Pinang, Tan Sri Pengerusi is from Kedah. But we accept the people of Malaysia, we accept the fact that Pulau Pinang is a sovereign state in Pulau Pinang, abiding by the Federal Constitution. That is all I ask, that guidance and a warning be given to the Honourable Member for Pendang. Thank you, Tan Sri Pengerusi.

Mr ChairmanEN

Okay. This is my guidance.

Point of order, House rules.

Mr ChairmanEN

Wait. While the debate was on, was the Honourable Member for Jelutong in the House?

[Speaking without a microphone] Yes. [Inaudible]

Mr ChairmanEN

Okay, in that case, since I too was not in the House, I suggest— it is up to Jelutong to look back at the Hansard, and if Jelutong genuinely feels an issue was raised that could bring him to the Special Select Committee, then write to me as a motion so that I can consider it, because I was not present at the time. I will then make a decision, or a motion will be made asking him to apologise. It is up to Jelutong, whatever motion Jelutong wishes to put forward. It is up to Jelutong, yes. Since I was not in the House.

Tan Sri Pengerusi.

Mr ChairmanEN

The best option is a motion.

Thank you, Tan Sri Pengerusi. I accept the guidance given by Tan Sri Pengerusi. This is not an issue of respecting me as a Member of Parliament.

Mr Chairman

Saya faham.

This is an issue of respecting the Federal Constitution as citizens of Malaysia.

Mr ChairmanEN

I fully understand, but since I was not present, it was not me who presided.

Terima kasih.

Mr ChairmanEN

So, the option we have is for Jelutong to put forward a motion.

Thank you, Tan Sri Pengerusi.

Mr ChairmanEN

Okay, Pokok Sena.

Jerlun, Jerlun.

Mr Chairman

Oh, sorry.

First of all, Tan Sri Yang di-Pertua, I would like to correct the facts brought up by Jelutong. In fact, it is not 36(9), but 36(10)(c). "Perkataan-perkataan yang harus menaikkan perasaan bersakit- sakit hari." Correction. Okay, that is the first point.

Second, I would like to repeat under Standing Order 44(1). I respect that Jelutong has the right to speak. But this Standing Order 44(1) seems to give an impression that Jelutong very often raises the same matters on different floors. [Applause]

We are talking about the water reform committee. The water transformation and this issue are not related to this water issue. So, I hope that only matters connected to the relevant subject should be considered if one wishes to interject or the like. Third, Honourable Tan Sri Pengerusi, there is the deciding authority under Standing Order 99. So, I no longer want matters relating to Kedah and Pulau Pinang to be raised in situations where they should not arise. He has his own floor. He has matters that relate to him. So, I ask that Tan Sri Pengerusi use the power under Standing Order 99 to end all the polemics related to the issues of the state of Kedah, Pulau Pinang and so on, and focus on the aspects of the committee being discussed. That is all.

Tan Sri Pengerusi.

Mr ChairmanEN

Wait, wait, wait a moment. Wait, wait, wait. Sit down, sit down for a moment. Pokok Sena may have misunderstood.

Jerlun, jerlun.

Mr Chairman

Jerlun, sorry.

Jerlun.

Mr ChairmanEN

I allowed that Standing Order because he rose as a Standing Order matter. So, my advice, since I was not there, is to put forward a motion. That is all. I did not entertain what happened. As Speaker, I must make a decision, and that is my decision. The question is whether he rose now, or tomorrow morning, it doesn't matter. So, what matters is that he has raised it, and any Member of Parliament who stands and holds a book, at any time, may do so. Only the Speaker has the power to see whether the issue raised is appropriate or relevant at that time. That is why I told Jelutong that I was not there. I also did not know. Therefore, Jelutong, put forward a motion. Let me look into it myself. After that, I will make a decision. That is all. So, for Jerlun to raise that matter, I think it is not appropriate at all, yes. Okay, thank you. So, I want to continue now.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Speaker. Speaker. May I, Speaker? Hulu Langat. This is also a standing rule. [Showing the book Peraturan-peraturan Majlis Mesyuarat Dewan Rakyat]

Mr ChairmanEN

Which item is that?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu Langat

18(1).

Mr ChairmanEN

Standing Order 18(1), what is the problem?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

It relates to the motion I submitted to Tan Sri Speaker. It concerns the Honourable Member for Pendang and the matter of dragging the Honourable Member for Pendang to the Committee on Privileges and Freedoms.

Mr Chairman

Baik, baik.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Because he called it Hulu Langat. Hulu Langat, the meaning is a nice name. A good name in meaning. The people there are also great. The people there are good. There is Hulu Langat, Tan Sri Speaker. At the same time, there is also Kuala Langat. Kuala Langat also exists. He called Hulu Langat by the name hulu laknat, meaning "cursed upstream". And also my friend from Kota Melaka. Kota Melaka, yes, Melaka is a historic state, isn't it. He called Kota Melaka by the name kota— kota celaka, meaning "cursed fort". That is why I very much hope Tan Sri Speaker will allow us to drag this Honourable Member for Pendang, to bring him to the Committee on Privileges and Freedoms. Because his mouth is extremely lewd. Extremely disrespectful and without manners. Thank you, Tan Sri Speaker.

Celupar. A foul mouth.

Mr ChairmanEN

Okay, okay, okay, okay.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Yes. Tan Sri Speaker, Kota Melaka.

Mr ChairmanEN

What else? Which Standing Order is it?

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Standing Orders 36(4), 36(6) and 36(10)(c).

Mr ChairmanEN

The same? Is it the same matter?

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Yes, because Pendang mentioned Kota Melaka, calling it a cursed fort.

Mr Chairman

Baik.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

When I return to my constituency, the people in my constituency are indeed angry at the attitude of that Pendang. So, I hope that Pendang can be referred to the Committee on Privileges and Freedoms to be dealt with.

Mr ChairmanEN

Okay. Okay, thank you. Any action I take must follow the rules. I cannot take action. Even though I have received a percentage of SMS messages urging me to take action. I cannot act in that way, yes. We have rules. So, right now there are two motions. Kota Melaka and Hulu Langat have both been received by me, and I have written to those involved to respond. The process exists and, God willing, in the near future I will make a decision and finally inform both Honourable Members whether Pendang will be brought forward or not, but wait a moment because I am still studying. I also have to consult several experts on language and culture in order to make my decision. Okay. I want to end this polemic here. So, now I want to continue by inviting Tenggara. Please go ahead.

Thank you, Honourable Tan Sri Pengerusi. Just now it seemed Tan Sri was ready, and I was disturbed by this, so give me two or three minutes.

Mr ChairmanEN

Yes, please go ahead. Continue.

Thank you. But over there they want to respond too. Whatever it is, calling it kota celaka and hulu laknat is really not right, eh. So, I will go straight to Item 020200. But before that, I will take this opportunity for this Item. The Deputy Minister was here earlier. I was worried the Deputy Minister went out and then came back in. Thankfully, Alhamdulillah. For RTB Johor, it is RM2.6 billion. 15 projects. 11 have been approved, 10 have been implemented. And for Tenggara, there is a little involving Kampung Panti. 307 old graves that have to be relocated. I hope it can be done properly because it has value and sentiment. But overall, I can also give a brief report. The Deputy Minister also diligently visits Tenggara. The project is indeed progressing well. Hopefully it can prevent flooding in my area. Yes. So, for Item 020200 – Sustainable Energy, from RM15.07 million it has dropped sharply to RM4.07 million. So, Tenggara wants to know why such a drastic reduction has occurred and how much allocation has been given to implement R&D studies to help contribute to the national Renewable Energy (TBB) agenda, and whether there are any inter-agency or inter-ministry collaborations? And is there any research grant to support the TBB agenda? I read in the newspaper about RISDA. The Honourable Deputy Prime Minister who is also the Minister for KDW announced rubber fuel. So, perhaps PETRA can look into it. How can it help with this rubber fuel-based initiative? And most recently, during a visit to Taiwan and collaboration with UMPSA, the chief researcher is Professor Dr. Abdul Adam Abdullah, with a grant of RM1 million. We found two possibilities. One, rubber can become petrol, diesel and gas. Second, when we went to Taiwan, actually the Taiwanese government has been using used tyres for 15 years to produce energy from oil. But that oil is not used for vehicles. It is used to run generators, and those generators produce electricity. I think this is something that may deserve attention, and grants or allocations under Item 020200, which dropped from RM15.07 million to RM4.07 million, should be re-evaluated. Because there are several things that could perhaps be synergised between the PETRA Ministry, MOSTI and so on, and other ministries, to look at the potential of new energy. Next, Item 13500 – Dam Rehabilitation. From RM55.66 million it increased to RM74.59 million, and it has also increased compared to last year, and this is related to Tenggara. In Tenggara, there is a dam located in the area called Linggiu Dam, near Linggiu and FELDA Linggiu, built in 1993. And this dam, according to the data I have, is very— it is already 30 years old, 1993, 30, 40 years. So, Tenggara wants to ask, what is the safety level of this dam? Because I have been told that if anything happens, God forbid, to this dam, it could become a fairly large land tsunami. And, my residents feel that the ministry, perhaps through dam management and so on, could distribute an annual report on the safety level and matters relating to this dam to areas such as Bandar Tenggara, FELDA Sungai Sibol, Taman Sungai Pinang, Taman Seri Indah, FELDA Penggeli Timur, regarding this safety level.

(TBB) of the country, and whether there is any cooperation between agencies or ministries? And is there any research grant to support this TBB agenda? I read in this newspaper about RISDA. The Honourable Deputy Prime Minister, who is also the Minister of Rural and Regional Development (KDW), made an announcement about rubber fuel. So, perhaps the Ministry of Energy Transition and Water Transformation (PETRA) can look into it. How can it help with this rubber fuel based initiative? And the latest development: during a recent visit to Taiwan and collaboration with UMPSA, the chief researcher, Professor Dr. Abdul Adam Abdullah, received a grant of RM1 million. We have found two possibilities. First, this rubber can become petrol, diesel and gas. Second, when we went to Taiwan, the Taiwanese government has actually been using scrap tyres to produce energy from oil for about 15 years. However, that oil is not used for vehicles. It is used to run generators, and the generators produce electricity. I think this is something that may deserve attention, and a grant or allocation under Item 020200, which has dropped from RM15.07 million to RM4.07 million, should be reassessed. This is because there are several matters that could possibly be synergised between the Ministry of PETRA, MOSTI and so on, and other ministries, to explore the potential of new energy. Next, Item 13500 – Dam Rehabilitation. It has risen from RM55.66 million to RM74.59 million, and it has also increased compared with last year. This is related to Tenggara. In Tenggara there is a dam called the Linggiu dam, located near Linggiu and FELDA Linggiu, which was built in 1993. According to the data I have, this dam is very — it is already 30 years old, since 1993, 30, 40 years. So, Tenggara would like to ask, what is the safety level of this dam? This is because I have been informed that if anything were to happen to this dam, nauzubillah min zalik, it could become a fairly large land tsunami. And my residents feel that the ministry, perhaps through the dam management and so on, could circulate an annual report on the safety level and matters related to this dam to areas such as Bandar Tenggara, FELDA Sungai Sibol, Taman Sungai Pinang, Taman Seri Indah and FELDA Penggeli Timur regarding this safety level.

And does— Tenggara wants to ask, does the management of this dam use the latest technologies that can guarantee safety, such as artificial intelligence, Internet of Things, remote sensing and also robust datafication. Because from my experience in 2024, I went to China for TVET, but I stopped at Changsha Environmental Protection College on 16 August this year, 2024, and there they adopt advanced oxidation process (AOP). They have supervisory control and data acquisition (SCADA), they have Geographic Information System (GIS), digital twins water health and also machine learning–driven hydro factory to ensure, what is it called, the concrete used to build the dam, they can know that at that very moment. And it is managed by the relevant college. So, I also want to know how the ministry ensures the safety level of this Linggiu Dam, which not only supplies water to Singapore but also gives people in Tenggara a feeling of unease if anything happens.

So, a dam safety report can give a good picture to the public, and it would not be excessive if— Tan Sri, may I ask for a little time, Tan Sri? And it would not be excessive either if the report could be distributed, and if possible, the company managing the dam should do some CSR in the surrounding areas so that it can provide clearer benefits. And for Visit Johor Year and Visit Malaysia Year, this dam should be able to be utilised, with an area of 122.7 kilometres, with 4 mountains and 55 hills submerged, a catchment area of 21,600 hectares, and a capacity of 763 million cubic metres. Apart from being a dam, it should also be opened up as a tourist area. So, PETRA must also look at how the surrounding community can benefit. And, for river management, recently I thanked the Honourable Deputy Minister, there was a response regarding the burst bank at Sungai Sayong. And I see that 125 inland fishermen were affected, 26 of them from Kampung Orang Asli Sayong Pinang, and we all know the pollution level reached 37,600 NTU. Whereas the normal level is 400 NTU.

So, what exactly is the ministry's plan under Item 15400 – Eco-Friendly Drainage River Utilisation Plan, which can be used to deal with the situations concerned? And Tenggara proposes that the implementation of ecology-based river management, eco-friendly drainage and river management can be carried out, and what is the ministry's long-term plan to ensure the same problem does not recur. Previously, Tenggara proposed that these rivers be gazetted for conservation so that we can protect the rivers as not only a source of water but also a source of income for the people. And for the knowledge of this House too, the Honourable Deputy Minister knows that the pollution of Sungai Sayong has disrupted the functions of LRA Linggiu, LRA Semangar, LRA Sungai Johor and LRA PUB, Singapore, disrupting the water supply for almost the whole of Johor Bahru and also part of Singapore. And that is why, given conditions like these, Tan Sri Pengerusi, Tenggara is actually eligible to be included under the special economic zone. I think if the water in Tenggara becomes polluted, not only Singapore and Johor Bahru will be affected, the water supply for the SEZ will also be affected. So, if possible, please include Tenggara in this SEZ. Although it is not directly related, this is because it is a kind of— a situation we can take advantage of. So, I think that is all from Tenggara, Honourable Chairman. Just one more point, which is related to this dam too. Apart from providing sufficient water supply to Singapore and Malaysia, for Visit Johor Year and Visit Malaysia Year 2026, a little attention should be given to eco-tourism, because this lake of 122.7 kilometres at Linggiu Dam should be able to become a tourist attraction and be utilised. What remains is the need for approval and arbitration from the ministry so that it can bring blessings, enjoyment and benefits to the community, directly and indirectly. That is all from Tenggara, Tan Sri Pengerusi. Thank you.

Tan Sri PengerusiPuan Alice Lau Kiong YiengEN

Okay, I invite Kangar.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of peace. Thank you, Tan Sri Pengerusi. I go to

Tuan Zakri bin HassanBERSATU · PNKangarEN

Item 020200 – Sustainable Energy, RM4 million, 2026. So, the energy transition is moving towards renewable energy (TBB), but the rate of uptake is still low compared with neighbouring countries such as Thailand, which is implementing large-scale solar-plus [Unclear] projects. Despite the announcement of policies such as NETR Phases 1 and 2, we still face issues of slow grid connection, high maintenance costs and a rate of implementation of TBB projects that is not in line with the targets, 70 per cent of electricity capacity from TBB by 2050. So, a question. What are the real obstacles causing grid connection for solar farms, biogas and mini hydro to remain slow? Can the ministry table the actual implementation timeline for the target of 40 per cent TBB by 2035 and 70 per cent by 2050? And how will the ministry or PETRA (Ministry of Energy Transition and Water Transformation) ensure that this renewable energy allocation is distributed fairly to small states such as Perlis? Tan Sri Chairman, I now turn to Item 13900 – Flood Control and Warning Signal Programme. RM22 million for 2026 compared with RM66 million for 2025. Regarding the Kangar area, there are several places that frequently flood whenever heavy rain occurs. So my question is, how many water-level sensors (IoT) have been installed by the Department of Irrigation and Drainage (JPS) around the Sungai Perlis, and what is their level of effectiveness? I now turn to Item 14500 – Urban Infrastructure and Drainage Upgrading, Flood Mitigation. So, the continuous and increasingly frequent rainfall during the Northeast Monsoon can cause flooding in the Kangar area because the water flow comes from upstream, namely from the north or Thailand. Several villages have been quickly submerged during heavy rain. Among them are areas such as Kampung Sempering, Repoh, Kampung Belangak Kudak and Kampung Bakau. So my question is, what is the long-term action plan by the ministry, through agencies such as JPS, to resolve this problem, which occurs every year? What are the ministry's efforts to upgrade urban drainage, particularly in the areas concerned? I now turn to the last item, Item 15000 – JPS Minor Works, Various States. Given that Perlis is a padi-growing state, although not a large one, allocations for JPS small projects have a major impact on agricultural activities. So, Kangar or the Kangar Parliamentary constituency

Tuan Zakri bin HassanBERSATU · PNKangarEN

requests that a pump house be built at the Sungai Batu Pahat area, namely at Sungai Lencongan Barat, to irrigate agricultural areas. I also propose that the Sungai Perlis be deepened to avoid the risk of flooding, which occurs very quickly. And finally, I also propose that farm roads and river banks in the Kangar Parliamentary constituency be repaired to facilitate the agriculture and agro-tourism sectors. This is because the areas along these river banks are often used as recreational areas by domestic tourists. That concludes my contribution, thank you from Kangar.

Tan Sri PengerusiPuan Alice Lau Kiong YiengEN

Good, next I invite Hulu Langat.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of peace, greetings of Malaysia MADANI, greetings of unity, greetings of blessings. I thank Tan Sri Speaker for allowing me, Hulu Langat, to join the debate at the Committee stage for the Ministry of Energy Transition and Water Transformation (PETRA). The code is 13900 – Flood Control and Warning Signal Programme. For the information of Tan Sri Chairman, Hulu Langat experienced a dark event in 2021, when almost the entire area of the Hulu Langat Parliamentary constituency was hit by a major flood after 40 years. According to the elders, the previous major flood was 40 years ago. And it came again in 2021. And thankfully, under the government of the Unity Government, the Kerajaan MADANI, under the Honourable Dato' Seri Anwar Ibrahim, a allocation of nearly RM512 billion has been approved for the Sungai Langat Flood Mitigation Project. However, Tan Sri Chairman, I want to know when this project will be set in motion or implemented to address the flood problems that often occur in the Hulu Langat Parliamentary constituency. About one or two months ago, Tan Sri Yang di-Pertua, Tan Sri Chairman, sorry, Tan Sri Yang di-Pertua. Because now we are at the Committee stage. So, Tan Sri Chairman. So, this is to teach, especially to our younger siblings who are present and watching our debate this afternoon.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Because I want to inform you that about one or two months ago, at Kampung Sungai Serai— Tan Sri Chairman, if you are familiar with Hulu Langat, flash floods often occur.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

At Sungai Lui, at Batu 18, at Kampung Jawa, at Dusun Tua, at Kampung Rantau Panjang, at Taman Sri Nanding, at Kampung Sungai Serai as I mentioned earlier, at Batu 10. In one week, Tan Sri, flash floods happened three times. So, we as Members of Parliament are also troubled, because the residents and the community living in the Hulu Langat Parliamentary constituency know that the Honourable Prime Minister has approved a very large allocation, a very, very large one, RM512 billion for the flood mitigation project along the Sungai Langat. However, the community, residents and people in the Hulu Langat Parliamentary constituency often wonder when this project will begin. Because, Tan Sri Chairman, Hulu Langat, Simpang Renggam, is known as a tourism destination. In Hulu Langat we have mountains, hills, rapids, rivers, orchards, places where people cycle, places where people do... weddings, and so on. There are hot springs and motivational camps in Hulu Langat. It has all kinds of places, attractive locations. That is why I also want to ask MOTAC (Ministry of Tourism, Arts and Culture), in conjunction with the Visit Malaysia Year celebration next year. If possible, tourist destinations and attractive locations in the Hulu Langat Parliamentary constituency could be included in the calendar as places or tourist destinations to visit, whether for domestic tourists or tourists from abroad. That is the first, Tan Sri Chairman. Then, the second, one of our problems in the Hulu Langat Parliamentary constituency is the clearing of land for housing projects— 500 acres, 600 acres, 700 acres. It is not that we reject these development projects, but what I mean is— yes, I have often said that we want these housing projects completed. If they are not completed, Simpang Renggam, Batu Pahat... [Laughter] Ha, Batu Pahat wants to debate too, Tan Sri, but it will be the last one, right? We want these projects to be completed. If they are not completed, they will come looking for us, the Members of Parliament. Then they will also come looking for KPKT (Ministry of Housing and Local Government). There is also a Deputy Minister. This Deputy Minister is from Parti Amanah. We must praise him. If I don't praise him, who else will, right?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

So, these housing projects, we want them completed, Tan Sri, but the surrounding infrastructure: how are the roads; how are the drains; how are the longkang (monsoon drains); how are the cemeteries? These are among the matters we also want to look at. Then, thirdly, Tan Sri Chairman, these land reclamation projects. Many are carried out in the Hulu Langat Parliamentary constituency. Because their land is hilly land, undulating land. At the initial stage, of course they reclaim with soil, they reclaim with stone. However, the problem is that in the middle of it, sometimes they begin to bring in domestic waste, which can cause air and water pollution. The problem, Tan Sri Chairman, is that when we lodge complaints with the Department of Environment (JAS)— ha, this is perhaps something we need to look at together. Perhaps the answers or information provided by the officers of the Department of Environment, they have no teeth, they have no claws, they have no power, they have no authority. That is why, here, I feel perhaps we need to re-enact an Act or regulations to give claws, to give power, to give teeth to the Department of Environment so that they can take action when we lodge complaints on matters relating to pollution, whether air pollution or water pollution. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Good. Thank you. I invite Padang Serai.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Tan Sri Chairman. I now go straight to Item 95000 – NRW, non-revenue water issues. Outcome 2, Programme 3 on page 4 sets an NRW target of 31 per cent for 2025, but the actual performance in 2024 was 34.3 per cent. This means we have missed the original target. What is more worrying is that the target for 2026 has been raised again to 33 per cent. It seems to acknowledge a failure to achieve a more aggressive target. Yet, according to studies, NRW of 33 per cent is actually a good figure compared with certain global standards. The question is, why are we not aspiring to something higher?

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

What are the government's plans, apart from the generic allocation under Item 95000 – NRW, to reduce it to a more competitive level, for example below 25 per cent? The allocation of RM340 million for NRW in 2026 needs to be explained in more detail. What specific strategies, technologies and enforcement will the government use to ensure that every ringgit generates a significant return? A discussion on NRW is incomplete without us touching on one case, namely the water crisis in Langkawi. A media report revealed that 45 per cent of the water supply to Langkawi is wasted due to leaking undersea pipes. This 45 per cent figure is not merely a statistic, it is a symbol of water asset management that needs to be improved. More disappointing, Tan Sri Chairman, we are informed that the groundwater project proposed to address this crisis is still at the study stage. Meanwhile, the people of Langkawi continue to suffer. The government is still studying study after study, as if that were the main output it could offer. This is a very disappointing admission. Rather than relying solely on conventional, dilapidated pipe systems, why does the government not implement a pilot system for the use of treated groundwater for domestic purposes, by learning from the expertise of countries such as the Netherlands in groundwater management through aquifer systems? Such action could reduce pressure on treated water supply and be more cost-effective in the long term. I would like to draw the attention of the Honourable Members to the successes of developed countries in managing their water resources. For example, Japan with its advanced underground dam technology, the Metropolitan Area Outer Underground Discharge Channel, and the Netherlands with its Room for the River philosophy, which prioritises nature-based solutions, have shown ways of managing floods and water resources that are more sustainable and cost-effective. Unfortunately, the approach reflected in the PETRA Development Estimates still appears trapped in an old paradigm. Building more large-scale hard infrastructure that often disrupts ecosystems. Just look at the large allocations for projects such as 15300 – Dredging River Mouths and 16800 – High Priority Flood Mitigation Projects. This is where I want to put forward a more innovative and cost-saving proposal that has been proven effective elsewhere and has also been studied for

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

application in Malaysia. The riverside water retention project, or TAPS. The TAPS concept involves building reservoirs in low-lying areas near rivers to store excess water during the rainy season, which can then be used for industrial and domestic purposes during the dry season. It functions as a flood mitigation system while at the same time improving raw water resources. I specifically propose that the ministry give serious consideration to building TAPS at strategic locations in the north of the Peninsula, such as at Sungai Muda, at Sungai Petani and in the Kulim and Padang Serai areas. These areas are the economic and agricultural lifeline, yet often face problems ranging from excess water to water shortages. As stated in the reference source, the state governments themselves acknowledge financial constraints in implementing such projects. Therefore, now is the time for the Federal Government, through PETRA, to step forward and pioneer this initiative under existing development allocations. For example, by diverting part of the funds from dredging projects that are less environmentally friendly to the construction of more sustainable TAPS. This proposal is in line with the functions of the Department of Irrigation and Drainage (JPS) under Item 030500 and can be integrated into existing projects under Item 15200 – Repairing, Beautifying, Cleaning and Treating River Water. Next, Tan Sri Chairman, I want to conclude my speech this afternoon by stressing that the PETRA Budget for 2026, in its present form, looks like a good document but is not bold and innovative enough to address the real challenges of the 21st century. It seems to preserve the status quo and offers too little in terms of water and energy management. I urge PETRA to review its key targets, especially NRW, more realistically and more aggressively, accompanied by a transparent and measurable action plan. Second, by looking at the best international examples and investing in more sustainable and smarter solutions such as TAPS projects, particularly in critical areas such as Sungai Muda.

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

Third, to review the distribution of allocations to ensure that every ringgit is truly invested in programmes that have a direct impact

Dato’ Azman bin NasrudinBERSATU · PNPadang SeraiEN

and long-term benefit on the nation's water and energy security and the well-being of the people. Thank you, Tan Sri Chairman.

Mr ChairmanEN

Good, I invite Balik Pulau.

Thank you, Tan Sri Chairman. I now go to Item 16800 – High Priority Flood Mitigation Projects. The Sungai Rusa to Sungai Pinang river flood mitigation (RTB) project was already discussed as early as 2022. However, at the end of that year, approval was given and the project was expected to begin. However, the project had to be halted after objections from the district office because the consultant did not follow the application and the original plan had been agreed. Formal objections were made to ensure the interests of residents are protected. Moreover, JPS informed that they are conducting a new study for the purpose of applying for allocation. However, until today there is no clear direction and no concrete commitment given to the people of Balik Pulau. So, the residents there and in surrounding areas are tired of waiting. Every time there is heavy rain, they continue to face overflowing water and damage to property. Therefore, I would like to ask PETRA, what immediate action will the ministry take to review the status of the Sungai Rusa-Sungai Pinang RTB project, and when can the ministry provide a clear timeline to ensure this project can finally begin. And how will the ministry ensure that the technical issues that caused this project to be halted in the first place, including the consultant's non-compliance with the original plan, are not repeated, so that the people do not continue to become victims of floods every rainy season. Chairman, next, under Item 14500 – Urban Infrastructure and Drainage Upgrading, Flood Mitigation. I want to focus on the issue of flood detention ponds in the South-West District, particularly Balik Pulau. According to JPS reports, there are about 40 flood detention ponds that have been identified as urgently needed to reduce the risk of water overflowing into village areas. However, until now these detention ponds have not been given proper priority. The allocation provided in the 2026 Budget is very limited, whereas detention ponds are among the most

...effective and cost-efficient, especially at Sungai Rusa, Sungai Pinang and Pondok Upih, which are often affected whenever there is heavy rain. I request that the ministry take note of this urgent situation and take immediate action to re-evaluate the priority of constructing flood retention ponds in the South-West district. I also request that the ministry consider additional allocations so that flood mitigation projects can be implemented without delay, since the Balik Pulau area is inherently highly exposed to flood risk. I would also like to request that JPS (Department of Irrigation and Drainage) look at the need for coastal protection structures, or coastal protection with permission, such as breakwaters or sea walls, to prevent high tides from entering the low-lying residential areas of Taman Nelayan, Kuala Jalan Baru and Kuala Pulau Betong, because these residents face the dilemma of high tidal seawater three or four times a year, damaging property because it is corrosive. So, I would also like to draw the ministry's attention to the issue of drainage works allocations within the Balik Pulau Parliamentary area, including Sungai Mati and Sungai Pinang, which require urgent dredging because drains are buried at Sungai Burung, and river cleaning and dredging works at several other locations are increasingly shallow and are causing floods. Next, Chairman, I would like to refer to Item 40000 – Energy Efficiency and Renewable Energy Programme. I welcome the Government of Malaysia's commitment in Budget 2026 to green energy transition through the National Energy Transition Roadmap (NETR). I would further like to speak about the Solar Accelerated Transition Action Programme (Solar ATAP), with permission, which is a new programme introduced as a continuation of the net energy metering programme that ended in June 2025. As we know, NEM previously played a major role in encouraging the public to generate their own solar energy and sell excess energy back to... [Unclear] However, with the end of NEM, the launch of Solar ATAP is very important to ensure the momentum of solar use does not stop. I would like to ask when— I request the Minister to explain because— sorry. Because there are additional incentives for this Solar ATAP programme, but the financial support mechanism to ensure public participation, especially among the M40, B40 and rural users, can be increased. So, I ask about the detailed plan for Solat ATAP.

NRW, Item 95000 – NWR. Many of my fellow Honourable Members have already touched on the issue of NRW. However, I would like to propose that our strategy be reorganised. Our focus should not be solely on the states with the highest NRW percentages, but on the states with large volumes of water consumption, because that is where the impact is most significant. Some states have high percentages but small water consumption volumes, such as Perlis. Although the NRW percentage is very high, its overall effect on the country is smaller. On the other hand, states that use large volumes of water but record significant NRW rates should be given priority, because every one percent reduction in those states yields much greater water savings. So, I propose that our NRW reduction policy give priority based on the volume of water lost and not merely on percentages. This will ensure that allocations, interventions, technical and expert support yield maximum returns for the nation's water security. With this approach, efforts to reduce NRW can be carried out more strategically, with greater impact, and bring more significant savings to the country. That concludes my speech, thank you.

Mr ChairmanEN

Alright, I invite Sik.

Assalamualaikum warahmatullah and good afternoon. Thank you, Tan Sri Chairman. I refer directly to Item 13400 – National Water Resources Development, which shows an increase in allocation to RM10.925 million for 2026. However, I still feel concern and raise questions regarding the urgent national needs that should be given attention so that this allocation truly produces a real impact on the development of the nation's water resources. We are facing very high NRW in all states, including in the state of Kedah itself, in my district. The same goes for water sources that we have not explored seriously, including groundwater. We face conflict over water sources, such as in Penang, which still depends on water from the Muda River from Kedah.

I also take as an example the district or island of Langkawi, which is now facing very high treated water loss, up to around 45 percent, as mentioned by the Honourable Member for Padang Serai earlier. And undersea pipe leakage is also among the causes of the island's water supply constantly being disrupted. I also raised, when the Right Honourable Prime Minister, who is also the Minister of Finance, announced in this august House a large allocation of RM400 million for the Groundwater Dam Project at Padang Mat Sirat in Langkawi. Although I have not seen the details, perhaps from RP1 there may be an allocation for this budget. However, the reason I raise this issue is to ensure that the Ministry of PETRA seriously looks at how groundwater dam technology, as implemented in Japan including in Okinawa, Miyakojima and Kumamoto, should be considered properly. By looking at the effectiveness of this groundwater dam, which suits the geology and land use controls, including recharge areas and water quality monitoring, if it is to be implemented in Pulau Langkawi. The Government needs to explain the detailed site study referred to in order to assess how far Langkawi's geological features are truly compatible with this groundwater dam model. Likewise, regarding Langkawi's very different physical features, perhaps the situation in Japan itself needs to be examined more carefully so that this project does not affect the environment, does not affect the original water sources, and does not affect water quality, which must not be compromised for domestic use. Next, Tan Sri Chairman, I also raise the matter of how the Kumamoto City project in Japan has practised this groundwater dam specifically for domestic use, and it differs from what the ministry may have seen before: the Okinawa project, where the groundwater dam is used— only for— for agricultural needs.

Certainly, these models need to be examined carefully by the ministry so that they can be implemented properly, because we are spending a very large allocation, namely the RM400 million that has been announced.

Next, I refer to Item 17000, namely NAHRIM (National Hydraulic Research Institute of Malaysia), which received an allocation of RM13 million for 2026. I am confident that this fourfold increase shows that NAHRIM's mandate is expanding within the national water management agenda, and I support the addition of these resources for research and development purposes. However, I also wish to request several explanations regarding this expenditure, including how the priority of NAHRIM's education relating to the matter mentioned, the NWIR 2040, namely the Water Transformation Plan 2040. And also how NAHRIM views technical projects or fields, including groundwater mentioned earlier, including the use of rainwater and reclaimed water, with permission, because this field is the backbone of innovation for the nation's water resources. I would also like to ask NAHRIM what technical records may have been seen in several countries, including Japan and the Netherlands mentioned earlier, as an example that we can implement in our country. Finally, Tan Sri Chairman, I refer to Item 16700, namely the Flood Mitigation Plan (RTB) and Urban Drainage. I refer to the Sungai Kedah Anak Bukit (SKAB) Package 2 RTB project, which has entered its 14th year but is still not completed. It has even been given five extensions of time (EOT). I sincerely request the Honourable Minister and Deputy Minister, if they come to Kedah, not only to visit the LRA at Bukit Selambau and so on, but also to look at this Sungai Kedah RTB, which has been extended for a long time, and we have seen how this delay has caused major floods in Alor Setar, Jitra and elsewhere. We do not want a repeat of the major flood of 2010, which submerged parts of these areas and caused hundreds of houses to be damaged. So I earnestly request this Sungai Kedah RTB, although far from Sik, but it is in the state of Kedah, to be implemented important as per the new schedule, namely it is said to be completed on 14 June 2026, and we do not want any further EOT after this. Tan Sri Chairman, thank you.

Mr ChairmanEN

Alright, and the last debater is Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Thank you, Tan Sri Chairman. Batu Pahat would like to touch on Item 15100 – Coastal Erosion Prevention, which involves an allocation of 172,423,000 for 2026. This allocation is very important in the Government's efforts to address the coastal areas of the nation from continuing to be affected by erosion and rising sea levels. Two weeks ago— two weeks ago, we witnessed a major high tide phenomenon that struck along the West Coast of the Peninsula, including Kuala Kedah, Kuala Selangor, Sekinchan, Pontian, Kukup and my own area of Batu Pahat. Mr Chairman, this phenomenon caused sea levels to rise between 2.9 metres and 3.4 metres along the coast of Batu Pahat, and in Selangor it was reported to have risen to 5.6 metres in Selangor. This caused many areas to be inundated, and some residents had to be relocated for safety. Mr Chairman, Batu Pahat would like to ask, what is the ministry's long-term framework for addressing the impact of this phenomenon? Will the ministry consider or prepare a new design or emergency design for the existing barrier and embankment structures? Because the current design is no longer able to withstand the very strong wave pressure. Mr Chairman, then what about the proposal to plant mangrove trees, which can help reduce coastal erosion because their root systems are very dense, able to stabilise the coast, thereby becoming a natural barrier against erosion from strong wave pressure and rising sea levels? My question is, is there any plan by any agency to continue the campaign to plant mangroves? Mr Chairman, we have many local coastal erosion experts. Some are from local universities such as UTM, UTHM and other local universities. Therefore, Batu Pahat thinks it is very proper that their expertise be considered or invited to provide a second opinion. Apart from that, Batu Pahat would like to request an explanation: does the ministry take an approach and draw experience from developed countries such as the Netherlands and Japan, where these countries have long developed integrated coastal and flood management systems with resilient and sustainable designs?

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Mr Chairman, next Batu Pahat would like to touch on Item 15300, namely Dredging of River Mouths. Therefore, Batu Pahat would like to inform the House about the mouth of the Batu Pahat River. This is because the Batu Pahat River is a very busy route with barter trade vessels, with permission, and is also one of the main routes for the outflow of rainwater and the main drainage system for urban and rural areas in Batu Pahat. Therefore, Batu Pahat would like to ask, when will the dredging works for the Batu Pahat river mouth begin? And to what extent is this dredging action expected to reduce the flood risk in low-lying areas of Batu Pahat, including the areas of Parit Raja, Senggarang and Peserai? This measure is very important to ensure the smooth flow of water out to sea, especially ahead of the monsoon season and the Northeast Monsoon phenomenon. Tan Sri Pengetua, I would like to mention again Item 13400 – Water Resources Development. Batu Pahat would like to take this opportunity to remind that apart from the Northeast Monsoon issue and flood concerns widely debated today, the country will also face a dry season immediately after the said monsoon period. In this regard, Batu Pahat would like to ask, what is the ministry's level of preparedness for facing the dry season, especially if river water levels drop critically or dam levels decline to the point of affecting raw water supply? And secondly, what are the ministry's short-term and long-term strategies to ensure the sustainability of water resources, including risk management mechanisms, contingency plans and coordination with state governments and water operators? And is the ministry exploring alternative water sources such as groundwater, ground water with permission, and if so, what is the latest status? And with the rapid growth of industries such as data centres in this country, which require very large amounts of water for cooling, what proactive measures does the Government have to ensure that this industry does not put pressure on the nation's water ecosystem? Finally, Batu Pahat would like to touch on Item 030400 – Sewerage Services Department, where the allocation is seen to have decreased by about one million compared to 2025. Batu Pahat supports the Government's efforts to improve efficiency and savings. However, Batu Pahat hopes that the quality of sewerage services and maintenance of sewage treatment plants will not be compromised, especially in the very densely populated residential areas of Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Priority should also be given to affected areas such as those in Batu Pahat at Pantai Berong Laut, Rengit and the Batu Pahat river. Therefore, Batu Pahat would like to request that PETRA take note of the areas within the Parliamentary constituency. That concludes my speech, thank you Mr Chairman.

Mr ChairmanEN

Alright, thank you. 25 people have taken part, and now I invite the Minister to respond, and the Minister is given 30 minutes. Please proceed.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum and greetings of peace. Tan Sri Chairman, first I would like to record my highest thanks for the concern of all the Honourable Members who have debated the issues within the scope and portfolio of the Ministry of Energy Transition and Water Transformation (PETRA) for the Rang Undang-undang Perbekalan 2026 (Supply Bill 2026) at this Committee stage. PETRA welcomes Budget 2026, which emphasises the balance between economic growth and the sustainability of energy and water resources for the welfare of the people. This emphasis is in line with PETRA's goal of ensuring that Malaysians can enjoy access to clean, safe and affordable energy and water, while protecting the environment and the nation's natural resources. For the information of Tan Sri Chairman and the Honourable Members, a total of RM51.9 billion has been allocated for the energy and water sector, namely RM392.7 million for operating expenditure and RM4.8 billion for development expenditure, or DE, involving 544 projects comprising 417 continuing projects and 127 new projects.

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

In an effort to improve the efficiency of water resource management and the resilience of national infrastructure, PETRA focuses on the implementation of 95 new projects valued at RM5.37 billion and 240 continuing projects valued at RM30.37 billion. Meanwhile, the Government is committed to achieving the net zero carbon emission target by 2050 through various strategic programmes such as Program Bijak

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

Tenaga MADANI, the nuclear energy development programme, the project to strengthen electricity supply in Sabah and Labuan, the implementation of the NETR which sets a target of 70 per cent renewable energy by 2050, and the Large Scale Solar (LSS) 6 Project. [The Deputy Speaker (Puan Alice Lau Kiong Yieng) presided over the Committee] Madam Chairman, we have heard 25 speakers. I estimate that the issues raised total about 100. So for this round, I will focus first on issues with national impact, and if time permits, we will respond to the specific matters raised by each of the Honourable Members one by one. I will begin with the energy sector. Among the issues raised is electricity theft arising from Bitcoin cryptocurrency mining activities. Kota Melaka, Mersing and several Honourable Members spoke on this in depth just now. For the information of the Honourable Members, at present there is indeed no specific law regulating Bitcoin mining activities. The PETRA Ministry (Ministry of Energy Transition and Water Transformation) controls the dishonest use of electricity for Bitcoin mining activities through section 37(3) of the Electricity Supply Act, namely Act 447, under which persons who dishonestly take electricity by any means, and upon conviction under section 37(3) of Act 447, may for domestic use be fined not less than RM1,000 and not more than RM50,000, or imprisoned for a term not exceeding one year, or both. For non-domestic use, the fine is not less than RM20,000 and not more than RM1 million, or imprisonment for a term not exceeding five years, or both. So, I myself have gone down to see the seriousness and the efforts we are making to eradicate this through enforcement methods, but for the next stage, for the information of the Honourable Members, the PETRA Ministry has set up a committee to address the issue of dishonest use of electricity for Bitcoin mining activities. It will be comprised of representatives from relevant ministries and agencies such as the Ministry of Finance, the Ministry of Digital, the Ministry of Housing and Local Government, the Ministry of Home Affairs, Bank Negara Malaysia, the Inland Revenue Board of Malaysia, the Royal Malaysia Police,

Tuan Haji Akmal Nasrullah bin Mohd NasirPKR · PHDeputy Minister of Energy Transition and Water Transformation · Johor BahruEN

the Malaysian Communications and Multimedia Commission, CyberSecurity Malaysia, the Local Government Department, the Energy Commission, TNB, and appropriate members. This is because we feel this committee will enable us to discuss matters covering policy, legislation and other matters involving cross-ministry and cross-agency coordination concerning electricity supply theft, such as measures to strengthen or improve existing prevention systems, appropriate redress for victims, strengthening and coordinating monitoring and enforcement activities, and proposing long-term solutions. This committee also has the role of facilitating matters that require intervention at the policy or policy level to curb electricity supply theft. So, rather than only looking at it from the enforcement perspective, PETRA has indeed planned for this committee so that we will look at it holistically. Insya-Allah, the first meeting will be held at the end of this year, and I will chair it. Therefore, in connection with this, if the outcome of the committee's discussions shows a need to introduce a policy on whether or not to ban Bitcoin activities, as well as improvements to this Act 447, these will be refined and then submitted to the Cabinet for consideration. As for the case raised by YB Rasah regarding the replacement of meters without the customer's knowledge: Based on the guidelines and the procedure for claiming revenue losses by licence holders in cases of dishonest electricity use, the entry of officers authorised by the licence holder into consumers' premises must be made using an authority card or any document issued by the licence holder, as provided under sub-regulation 10(2) of the Electricity Supply (Licence Holder) Regulations (PPBPL) 1990. In addition, officers authorised by the licence holder must inform the consumer or owner or representative of the premises of the purpose of the inspection, namely informing them directly if the owner of the premises is present, or leaving a notice of inspection and testing of the installation and/or the licence holder's meter at the consumer's premises. So, if there is a specific case that the Honourable Rasah wants us to examine, I can forward it to our office.

Tuan Cha Kee ChinDAP · PHRasahEN

Okay, thank you, Honourable Deputy Minister. So according to the SOP, the customer or occupant must be present there as a witness or something when they open the meter. Is that right?

For the process of replacing a meter, for meter replacement, the notice is usually given in advance. But in the case of tampering with a meter, because of complaints and so on, the matter is indeed a spot check when there are complaints and such. However, if there is an owner or representative of the premises, the matter must be notified directly, but if there is none, a notice of inspection must be left behind. So, that is indeed the SOP we use.

Tuan Cha Kee ChinDAP · PHRasahEN

Okay. Sorry, Deputy Minister. Why I raise this like this, you see, I do not agree with tampering with meters. That is why there are insufficient records. However, when the witness or the occupant's representative is not present, the occupant may say, "Oh, after he changed the meter, he placed something." So, there are all kinds of perceptions, because I must be fair to both sides. So I ask that, if possible, the occupant's representative be present before we replace the meter. If it is indeed tampered with, then the allegation of tampering is valid. So, I ask the ministry in this matter to please give the best directive for TNB and for customers. Thank you.

That is why, if there is a specific issue the Honourable Member wants to raise, please forward it to our side so that I can ask the Energy Commission to examine it carefully, because we understand the situation the Honourable Member is facing right now. However, as for the method, that is in accordance with the regulations as I have stated. Next, if I may...

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Deputy Minister, Kota Melaka. About the powers given to TNB. Because we understand that when TNB carries out operations, they can enter the premises without notifying the owner. Because if they notify, then they will do something. So, when they enter without notifying the owner, incidents occur. When they enter, they check that there is nothing wrong, and they leave the premises as they are, without informing the owner of the premises or the tenant, and then they simply go back. So, the door is left open just like that. And the neighbours have to go and inform the owner of the premises that

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

their door has been broken into by TNB. So, I hope that TNB can take note of such matters, so that in future they do things in a more orderly manner rather than in this way, because it will damage TNB's image.

Thank you, Honourable Kota Melaka. However, my understanding is that this meter can indeed be read. It should not be placed in a location that is difficult to access and so on. However, if there is a specific case, please forward it so that we can examine it in detail, if indeed there has been a breach and so on. But I believe that in terms of the SOP and also the regulator, which is the Energy Commission, if there is a complaint from consumers, the Energy Commission will certainly take action to investigate so as to be fair to all parties. Thank you.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Deputy Minister, regarding this Bitcoin matter, can TNB and the Energy Commission increase publicity to the public about how these syndicates operate, so as to create greater awareness among the public, especially property owners who will ultimately become the victims?

Thank you, Madam Speaker. Just a brief response. Indeed, at the ministry level, we have also launched the Malaysia Energy Literacy Program or MELP, which is intended to increase public awareness. Moreover, for property owners or those who may not be aware that this is happening at their homes or premises, our advice is for them to change the meter to the tenant's name with TNB. Rather than the owner bearing the burden of that risk, they can in fact issue a notice of change so that the responsibility is placed on the tenant. If I may continue. Regarding the establishment of MyPower, which was raised by YB Merbok just now, MyPower is in fact a special purpose agency established to support the government in carrying out strategic studies for policy decision-making and in drawing up the direction for reform of the country's electricity sector.

Subsequently, in November 2024, MyPower was given a new mandate as the Nuclear Energy Programme Implementing Organisation (NEPIO), with permission, in line with the government's intention to study the feasibility of nuclear energy for electricity generation. In line with energy transition initiatives and global technological developments, MyPower has carried out the future proofing study of the Malaysia Electricity Supply Industry or MESI. Through this study, various initiatives have been successfully implemented by the government, such as the activation of the National Energy Council, the restructuring of tariffs in Peninsular Malaysia which began to take effect on 1 July 2025, as well as the strengthening of the third party access or TPA framework, electricity supply and the strengthening of the gas supply procurement process for the electricity sector. Furthermore, MyPower was also entrusted with carrying out a six-month Pre-Feasibility Study on Nuclear Energy, which was completed in December 2024. This study explored nuclear energy options, including small modular reactors, and also identified critical gaps and new requirements compared to previous assessments, in line with the guidelines of the International Atomic Energy Agency. So, that is why MyPower is now detailing the assessment based on 22 key recommendations from the pre-feasibility study, to ensure that each proposal is studied in depth before being brought to the government's consideration. As for the question raised by YB Batang Lupar regarding energy efficiency projects and the government's strategy in providing specialised skills to local youth in the field of RE and alternative energy, we indeed have several programmes implemented through agencies such as SEDA Malaysia, among the courses we offer are the Installation and Maintenance of Grid-Connected Photovoltaic Solar Systems Course and, secondly, the Grid-Connected Photovoltaic Solar System Course for Wiring and Electrical Machinery Operators. Both these technical training and certification courses for solar installation are competency-based, and participants who pass both courses are eligible to obtain a Competent Person certificate from SEDA Malaysia. Apart from producing local youth with specialised skills certificates in the RE field, there are several higher education institutions offering RE courses to produce professionals in the RE sector, such as Universiti

Kebangsaan Malaysia, which offers the Master of Science Programme in RE and solar energy. Batang Lupar, yes. I will answer further regarding— For Sarawak, the implementation of projects we have under the NETR is in line with the Sarawak energy transition plan, as it supports more efficient energy use and better energy demand management, in line with the state's strategy to develop sustainable energy and reduce carbon footprint. PETRA and the state government always work together to strengthen this initiative, and Sarawak can complement our EECA efforts by taking the EECA legal framework as a reference for implementing the energy strategy in this country. As the Honourable Member is well aware, any electricity supply planning falls under the jurisdiction of the Sarawak State Government. In this regard, the Sarawak State Government has launched the Sarawak Energy Transition Policy in August 2025, which is seen as supporting the implementation of the national energy transition policy. Sarawak is also seen as one of the largest contributing states to the target of 70 per cent RE capacity by 2050. At the same time, the expansion of RE usage in interior areas is being implemented by the Ministry of Rural and Regional Development under the Rural Electricity Supply (BELB) programme. Next, if I may continue to the water sector for the remaining time. For the question raised...

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Honourable Minister, may I have a little?

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Okay, thank you, Honourable Deputy Minister, for the answer you have given just now. I only want to ask about other institutions that provide training for our young people to master this solar technology. Just now, the Honourable Deputy Minister mentioned SEDA and a university, but does the ministry intend to expand solar education to institutions such as CIDB, which we know is established in every state in Malaysia? Thank you, Minister.

Thank you, Batang Lupar. Madam Chairman, indeed there are many training centres, including

TVET, that offer courses related to electricity or solar. However, what I mentioned about SEDA earlier concerns competency matters, which are needed to obtain a licence to operate related work. So, if I may move on to the water sector, if not...

Just a little, just a little more, Deputy Minister. Just a little.

Ha, on this RE matter too: this renewable energy, just now I mentioned the discovery by RISDA regarding the rubber fuel research to generate— to produce electrical energy. If the ministry could pay a little attention to it. Thank you.

Thank you, Tenggara. We are always open to such proposals, which are more about policy or matters we can examine in terms of alternative materials that can be used to generate energy. But insya-Allah, all matters raised by the Honourable Member are recorded by PETRA officers. However, if I may move to the water sector, as this has been raised more by Honourable Members. The first matter concerns non-revenue water or NRW. Wangsa Maju, Kubang Kerian, Merbok, Masjid Tanah, Padang Serai, Balik Pulau, Sik and several other Honourable Members have raised the NRW issue, and under the Thirteenth Malaysia Plan (RMKe-13) the government will implement improvements to the existing national NRW programme that we have implemented since the Eleventh and Twelfth Malaysia Plans. This programme will be implemented from 2025 to 2030 through grant financing totalling RM2.525 billion. The programmes to be implemented are the NRW Approach 1 Phase 2 Programme, which involves replacing critical pipes throughout the country. This is like what Balik Pulau mentioned just now. For this new phase, we look at it holistically, not only focusing on states with more than 40 per cent. Meanwhile, the comprehensive NRW solution remains focused on six states, namely Pahang, Kelantan, Perlis, Sabah, Sarawak and also the Federal Territory of Labuan. Improvements to the NRW Approach 2 Programme involve the introduction of a pro rata rate for the matching grant reimbursement mechanism for NRW programme expenditure that has been implemented, to

encourage the participation of water operators. The states involved are Selangor, Johor, Negeri Sembilan, Melaka, Terengganu, Perak, Pulau Pinang and Kedah.

The feedback, or maklum balas, we have received is that without the pro-rata scheme, they are worried about the risk of implementing projects that are not completed as planned or are scaled down according to the plan, and they are worried that they will not be able to get the matching grant. Therefore, we introduced it on a pro-rata basis. Implementation of this programme is expected to reduce NRW in Peninsular Malaysia and the Federal Territory of Labuan from 34.3 per cent in 2024 to 28.8 per cent by 2030. As for the question raised by the Honourable Member for Rasah regarding the RM249 million allocation for the National Sewerage Project, for the Honourable Member's information, that allocation is not for the operational purposes of Indah Water Konsortium (IWK). It is not related. It is actually a development or CapEx allocation under the Sewerage Services Department (JPP) for the construction of new assets, upgrading works, infrastructure replacement and other development projects under the responsibility of the Federal Government. IWK's responsibility, meanwhile, is to operate and maintain the national sewerage system. This covers more than 7,500 sewage treatment plants, 1,500 pumping stations and more than 22,000 kilometres of sewer pipeline in Peninsular Malaysia, including the Federal Territory of Labuan. Next, as for the questions raised by the Honourable Member for Tebrau and also the Honourable Member for Tenggara regarding water supply in Johor, there are indeed raw water source projects in the state of Johor, under an initiative called Zero Dependency, which has been planned to increase water supply capacity and reduce dependence on external water sources. The list of projects I can share for the raw water transmission of Layang 2 Phase 1 was fully completed in December 2024. The LRA Layang 2 Phase 1 was actually completed in March 2024, while we expect Phase 2 in 2027. Then, there is also the Johor TAPS Programme. The Johor River TAPS is currently at the design stage. Then, the LRA Semanggar 3, which will depend on the Johor River TAPS Project. Then, there is the TAPS Project and also the Sungai Pontian Besar Dam, currently at the design stage, and there is also an LRA

Kayu Ara Pasong Phase 1. This depends on the readiness of the TAPS, and there is also the TAPS and Sungai Sedili Besar Dam Project. So, for the question by the Honourable Member for Tebrau regarding data centres, SPAN has already issued water supply guidelines for data centre development areas on 1 September 2025. For treated water, priority is given to domestic users, namely the people, compared with commercial users. In addition, the government is also exploring the potential use of treated effluent from IWK to produce reclaimed water for data centre use. IWK has established cooperation with a Johor State Government-owned company, Johor Special Water Sdn. Bhd., to lead the project for supplying treated effluent and reclaimed water to data centres. Overall, at this time, IWK through JSW has supplied 12 million litres per day of treated effluent from three sewage treatment plants for the production of reclaimed water for data centres. Madam Speaker, to understand the method of recovery...

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Minister, excuse me, please.

Oh, Tebrau. Please.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Minister. I am interested in the water for these data centres. Just now, you mentioned 12 million litres, but I think 12 million litres is not likely to be enough for the data centres in Johor, and returning to my original question— for those five days when we experienced water disruption, the water supply, nearly 1 million people in South Johor had no water. Did the data centre have a water supply, or does it have its own reserve? How does it operate? That is my question.

For my answer, I can give it verbally because I went down when that incident happened. Indeed, I asked the water operator, whether it disrupted the functions of the data centre as well. What I was told is that a stored capacity at the data centre was sufficient to continue its functions. And secondly, I understand they also took the initiative to buy water manually through their own tanker lorries. So, there was no favouring of any party. Next, for issues related to applications and so on, for the information of the Honourable Members, the application process for projects

development, or DE, in PETRA, generally begins with the identification of problems and project needs at the district and state levels. Platforms such as the State Development Action Council Meeting are among the platforms that can discuss development project priorities involving engagement, or, with permission, stakeholder engagement, with various Federal and state agencies. State governments also have space to submit their DE project wishlists to all ministries. In addition, the Right Honourable Prime Minister has also held a Special Development Meeting Roadshow with all state governments to scrutinise every development project wishlist applied for before it is approved and tabled in the Budget 2026. So, for the information of the Honourable Members, the management of the drainage system in this country is handled by various parties such as Local Authorities; the Drainage and Irrigation Department (JPS); the Public Works Department; developers; and related agencies. For the purpose of institutional adjustment, the Cabinet has also made a further decision which outlines the division of responsibilities and....

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Honourable Deputy Minister, may Puncak Borneo ask for a little clarification?

[Duduk]

Datuk Willie anak MonginPBB · GPSPuncak BorneoEN

Thank you, Honourable Deputy Minister. Just now, I heard that the project application procedure has its own committee and also goes through agencies and local state government bodies, but I suggest that this matter should also involve Members of Parliament and the State Assemblymen (ADUN) of the constituencies, because the people below complain to the Member of Parliament and the People's Representative, and also the ADUN. So, the level— at the agency level and also government agencies should cooperate with People's Representatives, because we know our constituencies better, where the problems are. So, I ask the ministry to consider involving them, whether they are opposition or government YBs, involving them [Applause]. So that our purpose in this country is to solve the problems of the people. So, I respectfully request that this consideration be given properly.

Thank you to the Honourable Member for Puncak Borneo. I am sure this happens at the district committee level as well as in the findings from below. That is why I mentioned earlier, this matter is indeed raised from the voices below, and the priority in terms of project selection depends on the state priority list. So, for a decision to be made, of course, if there are agencies or emergencies or other priorities, it certainly allows that consideration to take place. However, the framework of the engagement process, as Masjid Tanah has tried to raise several times. When we go down, why are we not invited and so on, even though in fact we know he is also busy as Chairman of the PAC. So, in fact, in terms of engagement or the process, it should indeed be carried out at the state level so that priorities can be expressed clearly, to allow allocation of the allocation to be made according to each priority. If I may touch on— it seems I did not have time to touch on it.

Tuan Khoo Poay TiongDAP · PHKota MelakaEN

Deputy Minister. Deputy Minister, the Honourable Member for Kota Melaka here. Regarding the Deputy Minister's answer, because usually meetings at the district and state levels do not involve Members of Parliament, and sometimes they also do not involve State Assemblymen. So, I hope the ministry can consider the wishlist that we Members of Parliament submitted to the ministry, and that it is also taken into consideration. For example, as in my speech, just now I mentioned the problem I face in my constituency: Taman Permatang Pasir Perdana Phase 3. I hope that problem can be included in next year's budget. Thank you.

Thank you, Kota Melaka. I was just about to go to Kota Melaka, where his question was raised in the Special Chamber, and thankfully, there is indeed an allocation that we have released amounting to RM500,000.

However, Kota Melaka wants a little more. So, that is why the process does involve engagement, whether at the level of the Honourable Members themselves, where the Honourable Member has made statements saying they want

to know the updates that I have made, either in the Special Chamber or in this august House. So, in fact, the stakeholder engagement process takes place at various levels. But as I said earlier, in principle, the priority of the wishlist from the state does have its own weight. Before I had the chance to get into the list of projects requested or raised by the Honourable Member. However, I know Madam Chairman is very strict about time. She just smiled a little, just now she— so for this one, I think whatever was raised by the Honourable Member, from Hulu Langat and so on, I do remember each one that was mentioned earlier, and we will record them and take note as the Honourable Member hopes. However, insya-Allah, if there are follow-up issues, for specific projects I will try to get the answers in writing, but...

Dato’ Ngeh Koo HamDAP · PHBeruas

[Bangun]

...All views and suggestions expressed, we take note of, take into consideration, and insya-Allah, with the spirit of cooperation and shared responsibility from among these Honourable Members, it is hoped that we can provide the best service. So, Honourable Member...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Minister, what was not answered, please provide a written answer. Thank you.

Insya-Allah, where there is an answer, I will provide the answer. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Deputy Minister of Energy Transition and Water Transformation (PETRA). The question is that the sum of RM392,742,500 for Head B.33 Operating Expenditure Estimates 2026 do form part of the Schedule, be agreed to. [Question put and agreed to] [Head B.33 ordered to stand part of the Schedule]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The question is that the expenditure under Head P.33 in the Development Expenditure Estimates 2026 be approved. [Question put and agreed to] [Head P.33 ordered to stand part of the Estimates]

Bill — Supply Bill 2026 and Development Estimates Motion 2026 Committee — Head B.30 [Schedule] – Head P.30 [Development Estimates 2026] –Bill

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Ministry of Science, Technology and Innovation. Supply Head B.30 and Development Head P.30 under the Ministry of Science, Technology and Innovation are open for debate. The list of debaters is as follows. There are 13 debaters. The Honourable Members for Batu Gajah, Jerantut, Sungai Siput, Machang, Betong, Padang Rengas, Shah Alam, Kubang Pasu, Miri, Kuala Krai, Rasah, Kapar and Bakri. I invite the Honourable Member for Batu Gajah.

Thank you, Mr Chairman, for giving me the opportunity to touch on Head 30 in a strategic agenda that will determine the nation's competitiveness in the coming decade, namely the development of artificial intelligence (AI), robotics, and research and development (R&D). Today, global competition is increasingly driven by digital innovation, and countries in the region such as Singapore, Indonesia and Vietnam are accelerating their technological transformation. Malaysia cannot merely be a user of technology. We must be the leader that builds and solves matters of high value for the economy and the people. Item 030100 – Implementation of National AI Policy and Governance. Madam Chairman, Malaysia has entered a new phase with the establishment of the National AI Office (NAIO) in December 2024 to coordinate AI policy, talent development and ethics comprehensively. We are also finalising the National AI Action Plan 2026-2030, a continuation of the AI Roadmap 2021-2025, to drive the use of AI in the economic and public sectors in a more orderly manner. Through NAIO, the government is also strengthening the principles of AI Governance and Ethics (AIGE) so that the country's AI development is always grounded in data security, privacy, transparency and fairness. This is important because society must be confident that the technology we develop complies with the value of integrity and does not misuse the people's information. In the digital ecosystem, talent is a determining factor. For that reason, NAIO's strategic collaboration with Google to train 445,000 civil servants

in artificial intelligence skills through the AI at Work 2.0 programme is a major leap in improving the efficiency of government services and building a future workforce capable of competing at the global level. Beyond the public sector, we need to strengthen talent development in universities, polytechnics and TVET, including Micro-credential programmes in AI, robotics and data science. Without sufficient skilled workers, the national digital agenda will not grow at the scale required. Mr Chairman, AI is no longer a future technology. It has now become the main driver of national productivity. In manufacturing, AI technology can reduce production errors and increase machine efficiency through predictive maintenance. In agriculture, the use of drones, sensors and predictive algorithms can help farmers determine harvest time, use optimal fertiliser and identify crop diseases earlier. In the health sector, AI has the potential to support early screening of chronic diseases, accelerate processes and help doctors make clinical decisions more accurately. At the same time, robotics, including industrial automation, logistics robots and construction robots, needs to be developed more strategically. I propose that the government consider establishing a National Robotics Testing Centre so that local robotic innovation can be tested, patterned and commercialised more quickly. Item 030200 – Funds and Commercialisation. Madam Chairman, we need to speak candidly about one important reality: Malaysia is still far from its R&D investment target. MOSTI's data shows that the country's R&D expenditure is only around 1.01 per cent of GDP. The target under the science, technology and innovation policy is to reach 3.5 per cent of GDP by 2030, a large gap that requires bold policy action. The government has allocated RM5.9 billion for research, development, commercialisation and innovation, but to achieve the 2030 target, we need stronger participation from industry, global technology companies and strategic investors. We must accelerate the patent registration process, facilitate innovation grants and reduce the bureaucracy that delays the emergence of local products into the market. MRANTI: Malaysian Research Accelarator for Technology Inovation is the leader in coordinating the national commercialisation ecosystem, with allocations under Item 040300. MRANTI must ensure that research

produced by universities, agencies and R&D centres can be translated into products, services and technologies that benefit the people and industry. MRANTI Park must be utilised strategically as a national technology development hub in fields such as artificial intelligence, biotechnology and health innovation. Collaboration with industry and investors must be strengthened to accelerate the generation of Intellectual Property (IP) and expand commercial opportunities. I propose that MOSTI establish an annual commercialisation report covering: (i) the number of technologies that successfully entered the market; (ii) the value of local IP developed; (iii) the number of start-ups mentored; and (iv) the industrial investment successfully attracted.

Mr Chairman, if Malaysia wishes to emerge as a developed nation driven by innovation, we must comprehensively strengthen the development of AI, robotics and R&D, from policy and talent to the industrial ecosystem and international collaboration. Our capabilities today will determine Malaysia's position on the ASEAN digital economy map in 2030. With a clear strategy, consistent investment and a commitment to innovation, I am confident that Malaysia can become an inclusive, creative and highly competitive technology hub. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Batu Gajah. I invite the Honourable Member for Jerantut.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and good greetings. Thank you to Madam Chairman. I now go directly to Item 00200 – Chemistry Department of Malaysia. With the increase in crime cases, drug cases and the increasingly complex demand for forensic analysis, the need to improve the efficiency of the Chemistry Department's laboratories has

a duty to the nation. The increase in allocation to as much as RM86 million is a sound step that the ministry should make good use of. However, the question is whether it is truly sufficient to improve laboratory facilities, speed up turn around time and ensure that the nation's forensic analysis standards remain on par with international laboratories? Item 00603 – Malaysian Space Agency (MYSA). The allocation of RM21.15 million to MYSA needs to be reassessed in the context of Malaysia's dependence on foreign satellite data. Congratulations also to MYSA on the launch of the first satellite with ACR technology, TerraX-1 or AIRSAT-03, which was launched on 19 October 2025. This is important because our country faces major floods almost every year, Madam Chairman. On food security and the need to monitor forests and borders, our capacity to process satellite data independently needs to be strengthened. So my question is, how can this allocation strengthen remote sensing capability, early flood warning systems and satellite applications for the agriculture sector, national security and disaster management? Item 00900 – Nuclear Malaysia Agency. The role of the Nuclear Malaysia Agency is becoming increasingly important in ensuring that nuclear technology is developed safely and has an impact on the economy. However, to date, the use of nuclear technology in the medical, agricultural, food safety, industrial applications and so on remains at a suboptimal level. We already have a clear strategy, Madam Chairman, on radioactive waste management and the direction of isotope development through the Nuclear Technology Policy 2030. So, my question is, with this allocation of RM44.48 million, what R&D focus will truly be translated into benefits for industry and also for the people? And secondly, what commercialisation indicators has the ministry targeted? Item 01000 – Atomic Energy Department. I see that the allocation of RM2.384 million is far too small, when this department is the backbone of nuclear and radiological safety regulation in the country. The use of radioactive materials in the medical sector continues to increase, and the risk of radiological incidents requires close monitoring and adequate expertise. The question is, is this allocation adequate to meet IAEA safety standards? Strengthening enforcement and ensuring the nation's preparedness to face any radiological incident.

Item 00800 – Development and Provision Programme (R&D). The problem, Madam Chairman, is not a shortage of research projects, but the ministry's lack of success in commercialising all the products that have been created. The gap between university research and industry needs is widening, as evidenced by the decline in industry participation in MOSTI R&D projects to only 15 per cent, Madam Chairman. So my question is, what reforms will be carried out so that RM75 million truly produces technology that can be marketed and generates returns to the nation, rather than merely academic projects that remain at the prototype stage? And finally, Mr Chairman, another important issue that arises in the context of MOSTI's 2026 budget is that agencies such as Malaysia Debt Ventures Berhad (MDV), NanoMalaysia Berhad (NMB) and Kumpulan Modal Perdana (KMP) are often cited in various reports as outstanding agencies under MOSTI. However, there is no clear allocation for them in MOSTI's budget this time. So, my question to the ministry is, do MDV, NMB and KMP truly not receive any allocation from MOSTI in Budget 2026, or are they financed outside the project or outside the budget? If there is no budget allocation, will this model be continued, and what are the long-term implications for policy control and the accountability of MOSTI agencies? Thirdly, if the government is interested in restructuring the role of technology financing through corporate agencies, will it ensure transparency of expenditure and the suitability of the National Science and Innovation Policy? I hope that through this winding-up, we can emphasise the importance of ensuring that MOSTI's strategic agencies, which play a major role in the nation's innovation, are not sidelined in the budget and in policy, but are clearly and effectively supported for the future of technology and the nation's competitiveness. Thank you. Peace be upon you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Jerantut. I invite Honourable Sungai Siput.

Tuan Kesavan a/l SubramaniamPKR · PHSungai SiputEN

Thank you, Madam Chairman, for allowing Sungai Siput to take part in the debate at the Committee stage of the Ministry of Science and Technology. I wish to refer to Development Head P.30, Item 00200 – Chemistry Department Malaysia, amounting to RM86.7 million, and Operating Head B.30, Item 030300 – Chemistry. The Honourable Minister mentioned the maintenance projects that will be implemented. However, my question concerns mobile chemistry laboratories. I understand that several mobile laboratory vehicles were approved the previous year for use in field areas. Please state the number of existing vehicles and where the existing laboratory vehicles are being used? For example, the pollution in the Perak River near the Kampung Sungai Papan bridge, Gerik, Perak. River water samples took a long time to be analysed. I was informed that the reason for the long time taken to analyse is, the mining areas upstream of the river. If chemical results are slow, offenders can escape responsibility for the offence. A mechanism needs to be established so that sampling can be carried out immediately and analysis can begin as quickly as possible when a pollution disaster occurs. If a mobile chemistry laboratory is on site, it can produce analysis results on the spot. I request that such a mobile laboratory be placed around the Perak-Kedah-Penang border area so that regular monitoring of water quality in this area can be carried out properly. In addition, for the expenditure head of the Chemistry Department Malaysia as well, I have been informed that the Narcotics Laboratory of the Chemistry Department Malaysia has problems in terms of equipment, staffing and upgrading of laboratory space. This causes delays in the preparation of reports, which has serious implications for the law enforcement process. Given that the Chemistry Department Malaysia greatly assists in mitigating the nation's legal processes, I believe the government should expedite efforts to improve the STI services of the Chemistry Department Malaysia. I also request that sufficient additional staffing be provided in the states so that the issuance of reports can be expedited. Thank you, Madam Chairman.

Tuan Kesavan a/l SubramaniamPKR · PHSungai SiputEN

If necessary, I also think a mobile narcotics laboratory could be set up to facilitate chemistry staff in managing cases in the field and to speed up the process of issuing reports. Next, Madam Chairman, I would like to move on to Operating Head B.30 Item 020200 – STI Promotion. I have also studied and found that the development allocation for P.00602 – Planetarium and P.00604 – National Science Centre is very small. RM2 million each. How does MOSTI plan to strengthen STEM efforts, given that I believe the enrolment of students in STEM fields has recorded a sharp increase of more than 50 per cent now, as stated by the Ministry of Education Malaysia? Programmes such as STEM Camp, which has made its name in the Malaysia Book of Records, should be continued and extended to schools of various streams so as to produce the nation's young scientists. What are MOSTI's efforts in this regard? That is all, thank you Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Sungai Siput. I invite Honourable Machang.

Thank you, Chairman. Operating Head B.30 Item 30000 and Item 01000 concerning the Atomic Energy Department. Malaysia is now at an important crossroads between great opportunities in rare earths and the risk of a new economic colonisation, especially since the ART reciprocal trade agreement with the United States also involves the rare earth sector. Lynas has a contract with the United States Department of Defense for the construction of a heavy rare earth processing plant in Seadrift, Texas. I am of the view that we must restructure the National Rare Earth Policy so that profits are not taken out while waste is left behind in our homeland. Rejecting foreign monopoly and demanding sovereign ownership is not anti-investment but a step to defend economic sovereignty and national security. This reform is not anti-investment, it is pro-Malaysia. Since 2012, Lynas has produced more than 1.8 million tonnes of radioactive waste without a complete permanent disposal plan. The permanent disposal facility (PDF), with a licence, was only 32 per cent complete when it was announced on 15 February 2023. Lynas's licence

has been renewed until March 2026, and there has even been a reported delay. Lynas's operating licence is being considered for renewal even though the PDF is not yet complete. Construction is now 72 per cent complete, lagging behind the target of 82 per cent, with completion expected around the end of 2026. As of 30 June 2025, Lynas Malaysia employed 855 workers even though it has enjoyed full tax exemption for 12 years. This is not sustainable development. This is development that mortgages the ecological future of the nation. I am not anti-nuclear, technology or atomic and so on, but we want the government today to be more responsible in managing and regulating, with licence, the technology we use to advance our rare earth sector. When the US wants to be free of China, America wants to be free of China, Malaysia is made a processing centre. We help them become free, but the people of Malaysia remain bound to radioactive waste. The Malaysia–America trade agreement (ART 2025) signifies that we are now part of the global rare earth supply chain. However, this chain is not balanced. Raw materials come from outside, technology and profits are controlled from outside, and the risks remain in Malaysia. Will American companies that enter Malaysia be given the same treatment as Lynas, or will we set higher standards? Malaysia must reaffirm the principle of a sovereign green economy, a sovereign green economy. We need a rare earth industry, but with high standards, local ownership and absolute accountability. The New Industrial Master Plan of Malaysia (NIMP) 2030 values the nation's rare earth resources at RM747 billion, with a potential to attract investment worth RM100 billion, which is expected to create 4,000 job opportunities. The rare earth sector contributes RM9 billion a year to the Malaysian economy and is expected to create 24,800 job opportunities by 2030. Lynas Malaysia operates the largest rare earth processing plant in the world outside China, accounting for 11 per cent of global rare earth metal production. In 2023, Lynas stated that it had invested more than RM3 billion in Malaysia. Over 12 years of operation, it has contributed more than RM4 billion to Malaysia's GDP, in addition to spending around RM230 million a year that supports the nation's economic development. Lynas is given tax exemption under pioneer status. According to the company's financial report, there is accumulated tax loss totalling AUD75.5 million in

Malaysia. If there were no exemption, Malaysia would potentially collect hundreds of millions in tax revenue. Malaysia must avoid depending wholly on foreign investors or markets. Ensure that trade and export agreements maintain Malaysia's rights over technology, profits and environmental safety. So, I ask MOSTI and NRES, who earlier already said it was good, I commend the Minister, Titiwangsa, to implement the key reforms, namely— landing Chairman, a temporary moratorium, Lynas's operations until permanent disposal is completed and independently audited. Second, an international environmental audit of all facilities in Gebeng. Third, the National Rare Earth Act (Rare Earth Act) to control the ownership of technology and waste. Fourth, a Malaysian rare earth R&D consortium involving GLCs, universities and local technology sector. Fifth, an environmental recovery fund financed by all foreign rare earth companies. So, I ask PH first to shout, "Save Malaysia, save Malaysia from Lynas". But today you serve Lynas. It is not that I say I am anti-Lynas, but you must walk the talk. I demand accountability from the MADANI government, with respect. So, I hope that what I have proposed earlier is that we want to improve the governance and administration of rare earths in Malaysia, and with that we hope the development of rare earth technology and economy goes hand in hand with environmental safety and the people of Malaysia. So, Chairman, I respectfully move. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Machang. I invite Honourable Betong.

Thank you, Madam Chairman, for the opportunity for Betong to also touch on the debate under Head B and P.30 – MOSTI, and especially those relating to Sarawak in the national research and innovation ecosystem. We all know that the future of Malaysia's economy depends heavily on mastering new economies, namely biotechnology, green technology, artificial intelligence and advanced innovation. All of these require a strong R&D foundation that is inclusive in terms of region. However, in RMK12, of the 17 R&D applications submitted by Sarawak, only one was approved. This raises questions about the

equality of opportunity and the level of regional participation in the national R&D ecosystem. Sarawak has capacity, but coordination and evaluation criteria at the central level need to be improved so that they better reflect the realities of the Sarawak region.

So, Betong will touch on the items under the heading STI Research. Firstly, Item P.00605, namely (NIBM) National Institute of Biotechnology Malaysia. So, Sarawak has world-class biodiversity and great potential in biopharmaceuticals, biofuels and agricultural biotech. Therefore, Betong would like to obtain an explanation: what is MOSTI's plan for us to strengthen NIBM's cooperation with universities and also research centres in Sarawak? And will biotech projects, especially in Sarawak, be established to capitalise on the strength of biodiversity in the Sarawak region? Secondly, Madam Chairman, Item P.00800, namely the Research and Development Programme, namely national R&D, where the cost of research in Sarawak is certainly higher. If we compare, due to geographical and logistical factors. So, Betong also requests that MOSTI assess the R&D eligibility criteria again so that they are more inclusive for us in Sabah and Sarawak. And Betong would also like to propose the establishment of either a regional R&D fund to support projects based on biodiversity, new energy and agrotech, which are very much in line with Sarawak's development focus. Madam Chairman, next is Item P.03700, namely the Malaysia Innovation Foundation or YIM. Betong greatly appreciates YIM programmes such as YIC, MyIS Komuniti and MaGRIs that have been implemented in Sarawak. However, measurable outcomes also need to be clarified. Therefore, Betong would like to ask, what is the outcome of the participation of Sarawak students and young innovators in YIC? How many projects were continued? How many have the potential to be commercialised? What are the impact assessment indicators for MyIS and MaGRIs, including the amount of allocation and the projects that have actually been completed? And does YIM plan to establish a permanent innovation hub in Sarawak and provide a network of mentors and continuous guidance programmes for our communities in rural areas? Next, Madam Chairman, is Item P.18000, namely the Malaysian Research Accelerator for Technology & Innovation (MRANTI). MRANTI also runs many

programmes in Sarawak through STI Sandbox together with SDEC and also StartUp Borneo. But the question is, what are the results? And Betong wants a clear answer: how many Sarawak innovation products have been commercialised? How many startups actually received funding and not just pitch decks? And how many Sarawak innovation projects succeeded in entering the market through MRANTI's intervention? Does MRANTI have specific KPIs for Sarawak? So, we need to avoid programmes that only produce reports and not impact. So, Betong wants to know to what extent MRANTI's programmes are aligned with the Sarawak Post COVID Development Strategy 2030. In terms of green energy, drones, agrotech and smart cities, or are they still using the generic national module? So, regarding the MakersLab Sarawak Science Centre, what is MRANTI's real commitment in terms of budget, timeline and implementation? Finally, when will MRANTI have a permanent physical presence in Sarawak? Such episodic presence is certainly not enough for us to build a sustainable innovation ecosystem. So, as a conclusion, Madam Chairman, we in Sarawak are ready to play a bigger role in the nation's new economy. And what is needed is equal access to funds, more organised participation in the national R&D ecosystem and a stronger MOSTI institutional presence in Sarawak. Therefore, Betong hopes that MOSTI can give a clear commitment for us to strengthen strategic cooperation, open up more research opportunities and ensure technology development efforts that are truly inclusive in terms of region. Thank you, Madam Chairman, thank you. I respectfully support.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Betong. I invite Honourable Padang Rengas.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you and may the mercy and blessings of Allah be upon you, and greetings of peace. Thank you, Mr Chairman. Padang Rengas wishes to take part in debating the allocation under Item B.30 for the Ministry of Science, Technology and Innovation. A strategic ministry that determines Malaysia's competitive position in the era of artificial intelligence, automation and green technology.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

One, science planning and culture development, allocation RM69.44 million. Mr Chairman, the allocation for Item B.30 020000 – Science Planning and Culture Development has decreased from RM69.94 million in 2025 to RM69.44 million this year. This is a reduction at a time when the country is losing students' interest in STEM and when we need more scientists, engineers and researchers. For Item 020100 – Strategic Planning. The allocation has also dropped from RM10.09 million to RM9.18 million. How will MOSTI draft the direction of the national STI if its own strategic allocation is reduced? Item 020200 – STI Culture. The allocation has increased to RM18.25 million from RM15.37 million. This increase is welcome. But the question is, how many field programmes involving rural schools and FELDA schools are actually carried out? In Padang Rengas, schools and students often say that no AI robotics or modern science module has reached them. Mr Chairman, second, the National Planetarium and the National Science Centre, Item 020300. The allocation has decreased to RM8.88 million from RM9.36 million. How will the planetarium remain relevant as a centre for space science research? Item 020400 – National Science Centre. The allocation remains at around RM15.1 million. But the question is, why is the National Science Centre still located only in Kuala Lumpur? We need mini National Science Centres in every state zone. Not just one building in the capital city. Third, the space authority. The allocation is RM918,700. Mr Chairman, the allocation for the space authority has decreased by almost two-thirds from RM2.5 million to RM918,000. How will Malaysia compete in the aerospace industry, which is worth USD600,000 billion a year, if the space monitoring agency itself is experiencing drastic cuts? Mr Chairman, the Academy of Sciences Malaysia. The allocation is RM17.1 million. The Academy of Sciences Malaysia is the national scientific advisory body. However, with an allocation of RM17.1 million, I would like to ask, how many of the country's science policies originally came from proposals by this Academy of Sciences Malaysia? Does their work genuinely influence the government's decisions? Fifth, technology development. This is the largest component of MOSTI and should be given serious attention. The total allocation for this has increased from RM374.1 million to

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

RM390.7 million. This increase is good, but we need to look at its components. One, Item 030100 – Strategic Technology, a reduction of RM550,000.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

My question is, will this be used for National AI 2.0? The Green Cyber Security Data Centre, or just seminars and workshops? For Item 030200 – Funds and Commercialisation. A good increase of RM1.74 million. Here, MOSTI's main problem for many years has been that its R&D is high but its commercialisation is low. I ask MOSTI to table statistics on what percentage of R&D projects were successfully commercialised from 2024 to 2025. If the commercialisation rate is below 10 per cent, that is a policy failure. Item 030300 – Malaysian Chemistry. This is the largest increase, from RM142.7 million to RM155.41 million. It is expected to be used to strengthen chemical forensics, food safety, investigation of banned substances and environmental analysis. But we want transparency, and what the actual output of this RM13 million increase is. Item 030400 – Atomic Energy Department. The allocation has decreased slightly at a time when Malaysia is developing nuclear technology for medicine. So I would like to know, when will Malaysia launch the new version of the National Nuclear Technology Policy? Item 030500 – Malaysian Nuclear Agency, rising from RM104.57 million in 2025 to RM107.13 million in 2026. The Nuclear Agency needs a comprehensive reform because it has the potential to help the country in medical radiotherapy, food technology, isotope production and industrial nuclear safety. I would like to urge MOSTI to expedite the Malaysian Nuclear Technology Master Plan 2030.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Time is up. Thank you, Honourable Member.

Kapten Azahari bin HasanBERSATU · PNPadang Rengas

Penutup, penutup.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

More than two minutes have passed already. Thank you.

Kapten Azahari bin HasanBERSATU · PNPadang Rengas

Sama-sama.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

I invite the Honourable Member for Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Assalamualaikum warahmatullahi wabarakatuh, greetings of Malaysia MADANI, greetings MOSTI. Thank you, Madam Chairman, for the opportunity to debate the 2026 Budget for the Ministry of Science, Technology and Innovation (MOSTI). I would like to refer to Operating Expenditure 030600, and Development Expenditure, Item 00603, which concerns the Malaysian Space Agency (MYSA). I see that MOSTI has the potential to become a major player in space technology in ASEAN. Most states have already expressed the intention to develop a space city in our country. This is a very noble effort, but I am not certain what role MYSA plays in the states' efforts to ensure these initiatives can run well. One of the main roles is to bring more international industries to invest in states that have a strategic location. This investment is important because we all know that learning in the field of aerospace is not cheap. Many space talents have been born, but the platform for them to hone their talents is still lacking. Therefore, I would like to ask MYSA, what efforts are currently being implemented to strengthen local expertise in satellite technology in line with the need to implement the National Remote Sensing Satellite Development Project through public-private partnership (PPP)? What economic benefits and fields of expertise can the country obtain through the implementation of this programme, particularly in efforts to achieve technological sovereignty and reduce dependence on outsiders in the design and operation of the nation's satellites? What key initiatives are planned by MOSTI to enhance the development of space technology innovation in Malaysia, and what achievements does the ministry expect to target in the near term to advance our national space technology ecosystem? Madam Chairman, next, for Development Expenditure, Item 00900 – Malaysian Nuclear Agency. With Malaysia's increasingly active relations and international cooperation with the United States, with China, with Russia, is the ministry considering the establishment of a nuclear talent pipeline focusing on training local nuclear experts within the next 10 years, so that we no longer depend on outside expertise when the country is truly ready to enter its implementation phase.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

What is MOSTI's strategy to ensure that the increase in the Malaysian Nuclear Agency's allocation from RM5.6 million to RM44 million is truly translated into technology development, local expertise training and R&D programmes that have an immediate impact on the country's preparedness? Looking at modern technologies such as small modular reactors (SMRs), which are smaller, safer and cost effective, does the ministry intend to study the possibility of Malaysia implementing a pilot project together with international partners, in line with the aim of giving the public a real picture and awareness of the advantages and safety level of this new generation of technology? Many of the Honourable Members have raised this view, either in written questions or in debates, showing that we are indeed very sensitive to this need in the future, and MOSTI must certainly pay serious attention to this matter. Finally, Madam Chairman, I would like to turn to other technology development agencies under MOSTI, namely the National Institute of Biotechnology Malaysia under Development Expenditure, Item P.00605, and the Malaysia Bioeconomy Development Corporation under Item P.18000, which play a role in the development of the nation's biotechnology. In the country's efforts to improve food security and reduce dependence on imported animal feed, what efforts are planned for 2026 to overcome this problem? We have also been informed about the development of the MyGenom programme. When will this genome sequence database be completed, and how will it help the nation's healthcare industry? Why is this effort not being carried out in collaboration with private health laboratories in the country to speed up the process? Furthermore, I see that the bioeconomy industry in the country, led by the Bioeconomy Corporation, is allocated only RM1 million. Is this allocation sufficient to develop biotechnology companies in the country, or what plans does this company have to ensure that biotechnology unicorn companies can be born and retained in the country to guarantee new job opportunities for Malaysians? Moving on to the start of the 13th Malaysia Plan (RMK13), I believe all the agencies mentioned just now need to be sensitive to the

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

regional economic situation and take appropriate steps to develop industries under their respective mandates. Thank you, Madam Chairman. Shah Alam requests support.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Shah Alam. I invite the Honourable Member for Kubang Pasu.

Thank you, Madam Chairman, for giving Kubang Pasu the opportunity to join the debate at the Committee stage on the MOSTI expenditure estimates. MOSTI is indeed a very important ministry for a country like Malaysia, which aspires to change from a middle-income country that relies on high technology obtained from other countries, other advanced nations, to a country that creates its own technology, with its people earning high incomes, and escapes the trap of the middle income trap. Although the total estimated OE and DE expenditure for MOSTI is only RM1.27 billion, not billions, the reality is that it is a ministry that is very important in shaping Malaysia into an advanced nation whose economy is based on science and technology, particularly high technology on par with advanced nations.

The basis of the application of high technology is technology created domestically through home-based R&D, not depending on foreign countries. No country whose economy is advanced in the world has its technology and R&D results taken from foreign countries. One important indicator for measuring this position is the number of patents granted each year. Let me give examples. Top six. China — its patents 799,000; United States — patents 329,000; Japan — 201,000; South Korea — 135,000; India — 30,000; and Germany — 23,500. This is a big number. The country with the highest number of patents granted is China, followed by the United States, Japan, South Korea, India and Germany. This means that the top six at the top have succeeded in implementing inventions that are useful in creating new technologies and new products. The ranking list for Taiwan is not here because it is not recognised as a country, but it is ranked top five in patents.

Malaysia is at 17th place in terms of the number of patents granted among ASEAN countries, namely more than 5,000 patents, in second place in ASEAN after Indonesia. There is still wide room for Malaysia to move up to the top ten. I am confident it can be achieved with the Minister of Science, Technology today. Malaysia's position in R&D in science, technology and innovation is still low, and it has not achieved the highest ranking in these patents because we still do not have what we call technical leadership at the central level. What Kubang Pasu means by technical leadership is adequate finance, infrastructure including R&D organisations. In terms of finance, the government needs to allocate a sufficient budget for R&D, not just less than one per cent of GDP at this time. Based on the national GDP for 2024, RM1.6 trillion, one per cent means RM16 billion, but our R&D budget is far lower than RM16 billion, less than one per cent. Imagine countries whose GDP is far larger than Malaysia's spending three to five per cent of GDP. In the MOSTI Development Budget 2026, for example, development decreased from 2025, RM537 million to RM516 million. It is already small but it has been reduced further. So, Madam Chairman, then in terms of R&D organisations, there are many educational institutes such as MIMOS, SIRIM and so on, but they are scattered and in disarray across the country. For the commodity sector, we have succeeded, such as RI, TRI and porin. Taiwan succeeded in R&D, especially in science and technology for semiconductors, because it had technical leadership, as they allocated a large budget to R&D, five per cent of GDP, and has an institute called ITRI — Industrial Technology Research Institute. Its name is also appropriate for the R&D carried out and the success achieved. ITRI has 6,500 technical experts and scientists. Most of these engineers and scientists are in various disciplines and industries. Established in 1973 with its mission to develop industry and create economic value through R&D technology. ITRI leads IC design in Taiwan and the results are transferred to industry. 90,000 companies benefit from it every year. ITRI implements an incubator system and TSMC is a company that once went through this incubator system. Their great achievement is TSMC. I give the example of Taiwan because I served there for 33 years as head of mission.

I see, Madam Chairman, that MIMOS has the potential to be developed as a national R&D organisation like Taiwan's ITRI and to become part of an anchor technical leadership, particularly for the semiconductor sector, and to become a champion for the country's semiconductor technology and industry. One of MIMOS's major roles when it was established was to become a centre for technological innovation and an R&D centre focusing on microelectronic semiconductors, E&E and ICT, as well as ecosystem development.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila gulung.

Just a moment. Kubang Pasu wishes to propose— wishes to propose, Madam Chairman. Kubang Pasu wishes to propose that MIMOS be strengthened to become a national science, technology and innovation organisation with emphasis placed on R&D and an incubation system, particularly for the country's semiconductor industry. MIMOS must be given a new lease of life, sufficient allocation and the talent development needed, and MIMOS can collaborate with other educational institutions, including USM, in making the country's semiconductor technology and industry a success. Thank you, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Kubang Pasu. I invite the Honourable Member for Miri.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you, Madam Chairman, for the opportunity given. I refer to Head P.30 Item 03700 – Malaysia Innovation Foundation (YIM). I begin by informing the House that the Nobel Prize in Economic Sciences this year, namely 2025, was awarded for research on innovation-driven economic growth, or, with permission, innovation-driven economic growth. Allow me also to refer to a book, "The Prosperity Paradox: How Innovation Can Lift Nations Out of Poverty". The message of this book is clear. Aid alone, although well-intentioned, often fails to create lasting prosperity. Countries that have received billions of dollars in aid remain poor because top-down models do not create markets. The way out is market creating, innovation, with permission, or innovation that is able to create new markets

Tuan Chiew Choon ManPKR · PHMiriEN

by turning non-consumers into consumers. The experience of advanced countries such as the United States, South Korea and Japan has proven that entrepreneurs and innovation that create markets have succeeded in attracting investment, creating jobs and developing the national economy. Madam Chairman, the Malaysia Innovation Foundation (YIM) has shown a real contribution to the field with a bottom-up approach, with permission. YIM has elevated grassroots innovation into a cost-effective solution for the economy to open new business opportunities for youth, women, persons with disabilities (OKU), B40 groups, and to bring projects born in village outskirts or classes from polytechnics directly to the market. YIM proves that we do not need to wait for big players to get on the ground; rather, local innovators can solve problems of water, food, health, security and family income quickly and with impact if they are given the guidance and resources they need. For the reasons I have stated above, I request that the government increase the allocation to YIM in the 2026 Budget from the current RM2.750 million to at least return to the level of RM6.725 million as in 2025, the 2025 Budget. Next, I would like to refer to Item P 00800 – Research and Development (R&D) Programme and P.09000 – Miscellaneous Equity Injections. I do not see a budget for Cradle. What is the Cradle budget for next year? Also, what is Cradle's plan to strengthen the country's start-ups? I would also like to ask about the implementation of KL20. Is it still under MOSTI? And what is the current status of its implementation and MOSTI's plans after the ASEAN Startup Summit that was recently held? Next, I would like to know about this equity investment. Will Cradle receive an allocation next year? And if so, how much allocation and what are their plans? Next, related to Head B.30 Item B 030100 – Strategic Technology. I would like to ask about the technology development that will be focused on by MOSTI in 2026. Is MOSTI also looking at technology transfer cooperation with external agencies as well as demand for technology from outside the country into our country?

Tuan Chiew Choon ManPKR · PHMiriEN

Next, related to Item B.020600 – Academy of Sciences Malaysia. I would like to ask about the i-Connect programme. Has this programme been completed and what is its expected impact? Next, I am also informed that the target this year is to produce 130 researchers per 10,000 workers in our country. How many researchers are there in the country now? Lastly, I would like to ask about Item B.030500 – Malaysian Nuclear Agency in relation to nuclear advocacy. I am of the view that cooperation to provide this explanation requires cooperation between industry, experts, academic bodies and so on. [Mr Speaker chairs the Committee] Indeed, this cooperation of various parties, including non-governmental bodies, is very important in ensuring that our society can be convinced that the presence of this industry does not harm public health and is beneficial to the local community. That is all, thank you.

Mr ChairmanEN

Alright, I invite Kuala Krai.

Bismillahirrahmanirrahim. Thank you Tan Sri Mr Speaker. Kuala Krai also takes part in the debate at the Committee stage for the Ministry of Science, Technology and Innovation (MOSTI). I refer Tan Sri Mr Speaker, to Item B. 020100 – Strategic Planning. The percentage of industry contribution to research and development projects is set at 15 percent for 2026, far lower than the actual achievement in 2024 of 54.17 percent and the target for 2025 of 40 percent. Meanwhile, the percentage of implementation of the National Science, Technology and Innovation Policy (DSTIN) Action Plan 2021 to 2030 according to annual milestones is set at 25 percent, differing from the targets for 2024 and 2025 of between 90 and 100 percent. My question is, why is the target for industry contribution in R&D for 2026 drastically reduced to 15 percent from the achievement of 54.17 percent in 2024. Does this indicate that the ministry expects a drastic fall in private sector involvement, or does it reflect a change in calculation methodology?

Does this indicate that the ministry expects a drastic fall in private sector involvement, or does it reflect a change in calculation methodology? What are the implications of this reduction for the goal of making Malaysia an innovation-based economy? Second, the second question, the implementation of DSTIN is set at only 25 percent for 2026, why are the annual milestone targets drastically reduced from 90 to 100 percent. How will the ministry ensure that these reduced targets do not send a negative signal to industry and investors that Malaysia is retreating from its commitment to innovation. Tan Sri Chairman, Item B.030400 – Atomic Energy Department or JTA. Malaysians are increasingly aware of issues of radiation safety, the transparency of radioactive material management and the country's true direction in nuclear technology. Therefore, I want to stress that any allocation to JTA must come with clear accountability and effectiveness. I would like to ask through this item, what percentage will actually go to enhancing enforcement capacity and not merely administrative costs? Malaysia is facing an issue of radioactive waste. Malaysia is expanding the use of radioactive materials in the medical, research and industrial sectors but the public remains unclear about where the long-term storage site is that truly complies with international standards? What is the status of upgrading radioactive waste storage facilities after several government audit reports showed weaknesses in procedures and a shortage of expert personnel? Is the 2026 allocation sufficient to strengthen radioactive waste management capacity or is it merely a temporary patch? We do not want Malaysia to become an example of a country that advances in using isotopes but regresses in managing waste. Tan Sri Chairman, the same item concerns the shortage of local nuclear experts. JTA often mentions that Malaysia lacks radiation safety experts, nuclear engineers and dosimetry officers. Yet efforts to build local expertise remain slow. The 2026 Budget should explain: (i) how many scholarships or radiation expert training schemes will be funded? (ii) how can MOSTI play a role in further increasing graduates in science and technology fields to address the country's weakness in the rate of enrolment in higher education?

(iii) what is preventing more creation of intellectual property and trademarks in Malaysia despite us being a major hub for the export of creative and high-technology goods? (iv) how can the ministry absorb more university graduates as research talent in the commercial sector as the main driver of innovation at the industry level? (v) will JTA collaborate more aggressively with universities and international agencies such as the International Atomic Energy Agency (IAEA)? (vi) how do we ensure experts do not migrate overseas due to more limited career opportunities here. Malaysia cannot depend on contract experts every time a complex technical issue arises. The same item, Tan Sri Chairman, concerns the future of Malaysia's nuclear technology. The country is talking about Small Modular Reactor (SMR) technology. Low-carbon nuclear energy and the potential use of advanced isotopes in healthcare. However, JTA cannot merely be a spectator to this policy, it must become an agency that leads safety standards, avoiding becoming an agency that only verifies forms and issues licences. I want to ensure whether the 2026 Budget provides specific funds for developing SMR safety guidelines? Is there a comprehensive audit plan for medical nuclear facilities? And is JTA prepared to issue a more transparent annual report on radiation incidents as practised by many countries? The MOSTI must give a clear commitment to structural and operational reform. The people want an institution that truly protects national safety and the future of Malaysia's nuclear technology. The last item, Chairman, concerns the allocation for the development of science, technology and innovation (STI) commercialisation. There are five items under the development of STI commercialisation that recorded RM0, or zero ringgit, in expenditure in the 2024 and 2025 Budgets, namely 01100 – MIMOS, 09000 – Various Equity Injections, 18000 – MRANTI, 40009 – Malaysian Bioeconomy Development Corporation and 83000 – MIGHT.

My question is why did five key STI commercialisation agencies record zero ringgit in expenditure in the 2024 and 2025 Budgets? What assurance does this year's budget give that it will truly provide the allocations as stated for the items above? And what programmes will be implemented through the large allocation totalling RM184 million in 2026 for those five items just mentioned. Thank you Tan Sri Chairman.

Mr ChairmanEN

Alright, next I invite Rasah.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you Tan Sri Chairman for the opportunity given to me to also participate in debating the Budget 2026 at the Ministry Committee stage for MOSTI this afternoon. The first point I want to mention concerns the development allocation for this ministry. Previously, the previous budget was RM537 million, this time it is RM516 million. Not increased, but decreased. I do not know why. Perhaps the Honourable Minister can. I know perhaps it is not the fault of the Honourable Minister. The Honourable Minister must have applied for a lot, but the distribution, why this ministry, because if we talk about the era of digitalisation, the era of AI, the era of new technology, this is the ministry that should be the backbone of all these technologies. So, I actually want to help the Honourable Minister so that he can lobby, if possible, to get an additional budget, because I feel there is a need, not because we simply want to add. The second point I want to mention is under Item 00200 – Chemistry Department of Malaysia. I see the development allocation has increased significantly from RM4.7 million previously to RM86 million. I welcome this. Why? The Chemistry Department, I apologise for saying so, is causing or becoming the cause of narcotics criminal cases being repeatedly postponed. I am not a lawyer handling criminal cases, but I receive many complaints saying that narcotics criminal cases, the accused is brought before the Magistrate for mention, postponed for a month, after that postponed again, given a new date, only because of what, the actual weight, yes, of the drug substance, which requires the Chemistry Department.

Tuan Cha Kee ChinDAP · PHRasahEN

For months, sometimes three months, four months, sometimes up to six months, I feel this is unfair. Sorry, but it affects the justice system in our country, and if there is an accused who is not granted bail, he has to remain inside. Eventually the accused may be acquitted and released, so we do not want this situation to continue. So I ask the Honourable Minister, with this increase, the large increase, may the Chemistry Department make a leap also in terms of effectiveness, the effectiveness of its work. The next item is 00800 – Research and Development (R&D) Programme. Yes, I mentioned it earlier. This should be the core ministry for R&D, but strangely, last year it got 116 million, this time it gets 5 million. I feel this is not in line with our overall direction, which I think is how we compete with others, that is one. Second, I want to mention that for this matter there are actually good R&D results from us, but I feel we may be lacking in terms of collaboration between government agencies and corporate, private parties outside to commercialise product outputs. I give an example of an agency in Australia that they call CSIRO, which is involved in research and so on. It has very good relations with corporations outside which can help commercialise product outputs and in turn help the government generate income. Because the agency itself, with private collaboration, can generate income and reduce dependence on government funds. If there is an opportunity, I hope the Honourable Minister and those involved can look at good models to be applied in our country so that together we can help boost our R&D sector. I want to ask about this R&D, what is the current status of the development of AI, artificial intelligence, because nowadays everyone talks about AI. So what is the government's direction regarding AI? Because AI is not one field, it is across our whole life, all sectors are involved. So I ask the Honourable Minister to be able to provide some explanation on this matter later. The last point I want to mention is Item 00900 – Malaysian Nuclear Agency. This receives a large increase, a large allocation of 44 million compared with five million previously. Is this increase because of the National Nuclear Technology Policy 2030

Tuan Cha Kee ChinDAP · PHRasahEN

which was launched two years ago, and to what extent is the implementation progress of this National Nuclear Technology Policy (DTNN). I want to say specifically, nuclear was originally, if people mention it, people are afraid, afraid of the danger, rather than recognising its benefits and importance. But the world has changed, we are in an era where if nuclear is used properly it can bring benefits, especially for the medical field. So I want to ask how nuclear can be applied and what are the main directions under the National Nuclear Technology Policy 2030 in ensuring nuclear energy becomes one of the important foundations of our country in national development. One, does not affect the environment, ensuring environmental sustainability continues and development is raised to a higher level. So this is just a brief debate from me for the MOSTI ministry, thank you Tan Sri Chairman.

Mr ChairmanEN

Alright, thank you. Next I invite Kapar.

Dr. Hajah Halimah AliPAS · PNKaparEN

Thank you Tan Sri Speaker. In the name of Allah, the Most Gracious, the Most Merciful, thank you Mr Chairman for the opportunity for me to debate the 2026 Budget for the Ministry of Science, Technology and Innovation at the Committee stage, which receives an allocation of RM1,275,900,600. I refer to B/P.30, specifically Item code 040400 - Malaysian Industry-Government Group for High Technology (MIGHT). So, I want to draw attention to the role of MIGHT under MOSTI as a strategic bridge between government and industry in high technology. If Malaysia wants to move towards a high-income economy, MIGHT must be given a sharper mandate and more measurable outcomes. So, firstly, MIGHT needs to ensure the national technology plan is truly translated into industry projects, not merely reports and consultation, consultation. We want to see the output of local companies climb up the value chain, an increase in patents and the development of technology that we own ourselves. Second, MIGHT's collaboration with strategic sectors such as AI, clean energy, aerospace, new automotive and biotech needs to be strengthened with clear targets and the involvement of quality international players for technology transfer. Third, integrity and transparency are very important. Every MIGHT initiative must be evaluated, an impact assessment accompanied by an impact assessment, current baselines as well as matrix

Dr. Hajah Halimah AliPAS · PNKaparEN

of success that can be held accountable to Parliament. We cannot let high-tech projects remain mere branding while the results for our people are not visible without any outcome. I refer to B.30 Item 020000 – Science Planning and Culture. I wonder why universities and schools still complain that there are not enough people, students interested in science. I know the irony. I read MOSTI's vision, what is MOSTI's vision? A technologically advanced nation. MOSTI wants a high-technology nation through science, technology, innovation and the economy. So it is only proper that the government focuses on careful planning together with a clear blueprint or master plan and a clear roadmap. So the irony is, we want a technologically advanced nation, but our problem that nobody can deny is the decline of interest in science across the country. If we look at gadgets everywhere, yes. Want fast, want quick, want easy work, games, speeds, volume, audio visual, AI, robotics, everything around us. Why, why are our people not interested in science when it is precisely science that produces all these things and we just want to be users. As far as statistics go, Malaysia is among the highest users of social media. That is science, the result of science. So Kapar's question is, we want details of this important matter, how many scientists are available and what are their fields? What science fields must and need to be mastered by the country to achieve this vision? What medical devices, including those using AI, will be produced by Malaysia, which have been and will be produced. How many scientists are needed to ensure our country, which is already rich in many resources, natural resources, biodiversity that is among the richest in the world, can be developed so that it becomes prosperous, sustainable, safe and well-being. With the strategic planning allocation of B.30 Item 020100 having shrunk to just over RM9,000,000, what can be achieved by only these 73 people in this item, yes. I want to help the Minister too, right? Referring to B.30 programme 020200 – STI Culture, this is over 18 million. According to one of the functions of this programme, Section C reads, "Managing and coordinating MOSTI's sponsorship initiatives for the implementation of STI culture programmes by various parties such as NGOs, PIBG, student associations, activity organising companies and so on...". Kapar is of the view that this function is good.

Dr. Hajah Halimah AliPAS · PNKaparEN

My question is, how can those parties mentioned work synergistically with the ministry? What mechanisms are there to activate the community, including local people, parents and students, to nurture the interest and inclination of the community to accept science as an important and primary matter, which can thereby nurture a more conducive ecosystem and a society that will support the culture of science. So, naturally when the community understands and is aware of how important science and technology are, surely their children who receive the spillover of science inclination will not have students who are uninterested in science subjects arising.

Dr. Hajah Halimah AliPAS · PNKaparEN

Just a moment, landing Tan Sri. For me, this is a micro, grassroots approach to make a good feeder system work, which will ensure the supply or pool of human capital related to science and technology, especially students in the Science stream, will be sufficient and encouraging. So with this, it will help solve the problem that is constantly repeated, including in this House. For several years now there has been a shortage of Science students. Please invite Kapar, yes, if you want to build this science community, those who are interested in science. The ecosystem is good, very, er, to make innovation a force, a force of their lives. So, do not forget to invite me, yes. There is still a lot, Tan Sri, yes, because this matter is very, very important, because this is the only ministry that says it wants to make this country technologically advanced. So, there is a lot, many things we need, need to mention, but it seems there is no time. Pity my friend, what's his name, later, right. So, I hope the R&D is not just one-off, Minister, it needs to be staggered. Because those who do this research, they need time, they cannot be one year only. So, you have to be multi-layered. So, you really have to plan for it and listen to their problems so that you want results at the end of the day, the bottom line is results. Thank you Speaker.

Mr ChairmanEN

Alright. I invite the last one, Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Thank you Mr Chairman for the opportunity given. Batu Pahat wants to stress that the role of MOSTI is very important in empowering the development of the nation's future research, innovation and technology.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

First, Batu Pahat would like to refer to the role of the Malaysian Nuclear Agency, referring to Items B.030500 and P.00900 amounting to RM44.48 million. I request a detailed explanation of the breakdown of this allocation. For the information of all, nuclear technology in the medical field is now very critical, especially in the aspects of cancer detection and treatment. For example, radioiodine is widely used to treat thyroid cancer, which is the eighth most common cancer in Malaysia and among the most frequently occurring cancers among women. Although the cure rate for thyroid cancer reaches around 90 per cent within five years, the cost of treatment remains high because it depends on the purchase of medical radioisotopes and the limited facilities for detection modalities and cyclotrons in the country. Batu Pahat is of the view that this treatment cost can be reduced through collaboration in nuclear medicine services between MOSTI and medical agencies such as local universities and the National Cancer Institute (Institut Kanser Negara). Therefore, what is MOSTI's view on the proposal for sharing expertise and facilities? Mr Chairman, secondly, Batu Pahat would like to touch on the management of radioactive waste by the Malaysian Nuclear Agency and the Atomic Energy Department. Batu Pahat sees the role of Nuklear Malaysia as the national radioactive waste depository centre as very important, as a long-term commitment to ensure that the management of the country's industrial waste, especially the rare earth element (REE) industry, is carried out safely, sustainably and in compliance with international standards. Accordingly, Batu Pahat would like to ask, what efforts are being and will be carried out by Nuklear Malaysia and the Atomic Energy Department to give investors confidence regarding the safety aspects and management of radioactive waste in the country? Will MOSTI carry out consistent nuclear advocacy to raise public awareness of the importance of nuclear technology for industry without compromising public health and safety? Mr Chairman, thirdly, Batu Pahat would like to touch on the development of village innovators by the Malaysia Innovation Foundation (YIM). Item P.03700 allocates only 2.75 million next year. With such a very limited allocation, what is the strategic plan of the Malaysia Innovation Foundation, namely to develop local innovators? Is it to empower technologies developed at the community level and to replicate those innovations to other locations throughout Malaysia?

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Mr Chairman, fourthly, Batu Pahat would like to refer to Item P.00604, namely the National Science Centre (PSN), and P.00602 – National Planetarium, each receiving RM2 million. I note that the National Planetarium did not receive such an allocation previously. I would like an explanation: what programmes or upgrading are planned under this new allocation? As for the National Science Centre, Batu Pahat sees that programmes such as Kembara Rehlah Sains have been implemented in several religious institutions in Kedah and Perlis. However, the programme has not yet reached Batu Pahat. So, I would like to ask, does the National Science Centre plan to implement Rehlah Sains or other outreach programmes in the Batu Pahat Parliamentary constituency next year? With that, I request that MOSTI consider it. That concludes my contribution, Mr Chairman, thank you.

Mr ChairmanEN

Alright, thank you. There have been 13 debaters who have taken part. Accordingly, I invite the Minister to respond, and the Minister is given 20 minutes. Please proceed.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

Thank you, Tan Sri Mr Speaker. Thank you, Honourable Members. Greetings of peace, and greetings of Malaysia MADANI, to all who have, who debated, who took part in the debate today. First of all, I would like to express my thousand thanks to all thirteen Honourable Members who took part in the Budget 2026 committee-stage debate session, which touched on issues under the purview of the Ministry of Science, Technology and Innovation (MOSTI). Some may involve policy-level matters, but I will try to answer what was raised earlier. This is because it shows the support and appreciation of Honourable Members for MOSTI's efforts to uphold the national agenda for science, technology and innovation in line with the concept of Malaysia MADANI. As Honourable Members are aware, MOSTI's budget for 2026 has shown a slight decrease compared with previous years. [Laughter] Overall, for 2026, MOSTI received an allocation of RM1.28 billion, of which the operating budget amounts to 759.68 million and the development budget amounts to RM516.21 million.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

Compared with 2025, MOSTI's operating allocation for 2026 has increased by almost RM21 million or 2.81 per cent. Meanwhile, the development budget shows a decrease of almost RM21 million, or 3.6 per cent compared with 2025. Overall, MOSTI's development budget shows positive growth of 33.5 per cent from 2022 to 2026, proving that allocations for MOSTI are always prioritised by the MADANI Government. Mr Speaker, before I answer the questions or the debate in detail, I would like to say that, in general, many Honourable Members raised that the reduction in MOSTI's allocation, especially the insufficient development allocation, is indeed a problem that we must address seriously. And I can tell, I can inform this august House that the allocation is indeed not enough. It will never be enough. Every year, no matter how much allocation there is, it will never be sufficient. However, as a ministry or as a government department, we also need to take into account the current state of the nation's finances, in particular, as we know, this year we have the harmonisation of salaries for government employees. I would also like to give a general picture of why allocations for certain agencies or certain divisions have been reduced. For example, some receive one-off projects or projects for only one year. After the project is completed, they will not receive it for the following year. That is one-off. I give the example of PSN, the National Science Centre. We have just carried out, what is it, upgrading, and now it has just reopened after being closed for nine months for renovation and upgrading. So, that is PSN.

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

And also, when R&D projects have been completed, they naturally will not receive new ones. And there are also situations where, when the government's focus shifts, I give the example of STI research, whose development allocation has indeed decreased this year. But for STI service development, it has increased sharply by 62 per cent from this year, RM141.49 million, and next year it will be RM229.07 million. Mr Speaker, these are some of the reasons why some agencies did not receive allocations or their allocations have decreased. I would also like to take

Tuan Chang Lih KangPKR · PHMinister of Science, Technology and Innovation · Tanjong MalimEN

the opportunity to give a bit of good news to Kapar, because earlier Kapar mentioned the percentage of students interested in STEM. I checked again: in 2021, the number of students entering the science stream was 40.95 per cent. In 2022, 40.94 per cent. There was a slight decrease. In 2023, students entering STEM was 45.73 per cent. There was an increase in that respect. Last year, 2024, there was a further increase, namely 50.93 per cent of students chose the science stream, which is the STEM stream.

Excuse me, Minister, may I?

Tuan Chang Lih KangPKR · PHTanjong MalimEN

I haven't got to it yet...

STEM has many categories, you know.

Tuan Chang Lih KangPKR · PHTanjong Malim

Betul, betul.

Package A, package B, but C, D, they are not STEM, they don't do pure science, you know: physics, chemistry, biology, additional maths. So, they cannot do that, they also cannot become engineers. Only A and B can become engineers.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Not pure science.

Yes, not pure science.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Thank you for the explanation.

[Speaking without using the microphone] A high percentage does not actually solve our problem.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

I understand. I took the data from the Ministry of Education (KPM). [Laughter] Thank you, Kubang Pasu, and thank you, Kapar. I want to focus on answering the issues raised. I will begin with the Honourable Member for Shah Alam, regarding the Malaysian Space Agency. For the information of the Honourable Member for Shah Alam, MOSTI, through the Malaysian Space Agency or MYSA, has implemented initial initiatives beginning in 2022 in preparation for the implementation of the National Remote Sensing Satellite Development (PSPJN) through a PPP, or public-private partnership. Space technology facilities under MYSA have been strengthened to ensure the nation's readiness in the development and operation of satellites.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Among the efforts implemented are upgrading the Assembly, Integration and Test (AIT) facility at the Space Technology Complex, Banting. The TTNC mission control station in Banting, to increase the capability for controlling and monitoring national satellites, and the Earth Station at the Space Operations Complex (SOC), Temerloh, Pahang, to ensure the capability to receive national remote sensing satellite data more efficiently and with high capacity. These measures are important in ensuring that the nation's space technology infrastructure can support the development and operation of national remote sensing satellites optimally. MOSTI also places emphasis on human capital development through the implementation of various technical and practical training. This includes on-the-job training in satellite testing, technical courses related to satellite subsystem design and antenna system operation, and the participation of MYSA engineers in technical working groups, seminars, conferences and international workshops related to satellite technology and remote sensing. Economically, the development and operation of the PSPJN satellite has the potential to drive the local space economic value chain, strengthen high-technology industries, and open up space, opportunities and room for commercialisation in the remote sensing, smart agriculture, environmental monitoring, disaster management and urban planning sectors. This is in line with the nation's experience in the development of the MEASAT Programme, where the country succeeded in creating competent local industry players in the field of communications satellites. Next, regarding...

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Minister, Honourable Minister, thank you for that answer. We hope the minister will invite us to visit those testing centres. Thank you. [Applause]

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Yes, yes, Honourable Member, we certainly can and will do so. Thank you. As for the Honourable Member's question on MyGenom, the complete national genome reference database of Malaysians is expected to be completed by the end of 2028. However, genome sequences for 2,400 healthy individuals under the MyGenom project will begin to be available from March 2026. Access to this data is subject to strict control through the Data Access Committee, and every application to use the data will go through a screening and assessment process by the DAC, or Data Access Committee, in order to

Tuan Chang Lih KangPKR · PHTanjong MalimEN

ensure data sharing is carried out ethically, responsibly and in compliance with the prescribed security standards. Next, to answer the questions of the Honourable Member for Rasah and the Honourable Member for Jerantut regarding MOSTI's R&D budget for 2026. The allocation of RM75 million approved in 2026 under Item P.00800 – Research and Development (R&D) Programme is sufficient for the implementation of MOSTI's R&D. In this regard, the allocation approved to MOSTI is subject to the current progress of ongoing projects and to mission-based R&D plans to be implemented in line with the R&D direction for the 13th Malaysia Plan (RMK13). Regarding the budget for three agencies, MDV, NMB, MDV is Malaysia Debt Ventures, NMB is NanoMalaysia Berhad and KMP is Kumpulan Model Perdana. It depends on applications and approval by MOF, but MDV and KMP, as financing agencies, have their own financing capacity through sukuk issuance, and NMB has received an allocation for the HyPEReactor Project of RM2 million. In addition, MOSTI will offer follow-on financing for projects that have the potential to move to the next phase based on technology maturity levels. This will increase the potential for commercialisation of projects financed by MOSTI, and MOSTI will optimise allocations through the realignment of priorities and strengthen collaboration between government, academia and industry. To answer the question of the Honourable Member for Padang Rengas, commercialisation is acknowledged to be low, but MOSTI is now developing strategies to improve the commercialisation of the nation's R&D outputs. For example, MIMOS implements a commercialisation strategy based on close collaboration with industry, IP licensing and the development of technology demonstrators. Through this approach, industry is involved from the early development phase, MIMOS IP can be licensed to local companies, and pilot projects can be carried out first to reduce risk before full-scale implementation. As a result, 354 patents have been successfully commercialised to date, showing the effectiveness of the commercialisation model adopted. Regarding the questions of the Honourable Member for Padang Rengas and also the Honourable Member for Kuala Krai on the National Nuclear Technology Policy (DTNN) 2030, under

Tuan Chang Lih KangPKR · PHTanjong MalimEN

the Nuclear Agency is complete and comprehensive, but the allocation regarding nuclear energy is still under consideration. As a regulatory body, it is a key principle for the Atomic Energy Department to be a neutral entity, namely not to promote or set policy regarding the use of nuclear technology. As for the breakdown of the Various Equity Injection fund, P.09000. For the information of the Honourable Member for Kuala Krai, Cradle Fund received an allocation of RM26 million, while MTDC received an allocation of RM34 million.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

As for the question on the allocation for cross-ministry RDCI activities, the nearly RM5.9 billion stated during the Budget 2026 speech involves the budgets of various ministries and agencies. I believe the breakdown of this budget is still being refined and will be announced in due course. Regarding the question about— sorry. The MIGHT budget. The allocation totals RM106 million. Focusing on two strategic priorities, RM105 million will be channelled through MIGHT's subsidiary, Venture Tech, to implement the high growth high value Bumiputera strategic investment fund programme, which aims to strengthen the participation of Bumiputera companies in high-value sectors through investment, capacity building and technology acceleration. Meanwhile, the remaining RM1 million is allocated to advance initiatives for the development of the non-radioactive rare earth element (NRRE) industry, including research, value chain mapping and strategic collaboration, to ensure the development of the country's REE is carried out with integrity, sustainability and foresight. As for the question of the Honourable Member for Betong regarding MRANTI, B.30, 040300 – Special programmes amounting to RM48 million is an allocation for the emoluments of MRANTI staff to ensure this agency continues to be able to drive national innovation programmes. Meanwhile, the allocation under P.18000, amounting to RM10 million, will be channelled as a commercialisation fund. MRANTI will launch this fund next year, where applications are expected to open as early as the first quarter of 2026. This fund will be a key catalyst aimed at financing at least 10 high-impact projects at Technology Readiness Levels (TRL) seven to nine. For now, the main focus will

Tuan Chang Lih KangPKR · PHTanjong MalimEN

be given to projects that are aligned with the MySTI framework and the RDICE Roadmap. Regarding the Honourable Member's proposal to increase funding for MRANTI, this will be considered for the nation's strategic programmes. Regarding next year's plans for MySTI, MRANTI has drawn up an action plan for MySTI for 2026 based on three main strategies: increasing MySTI certification and R&D outreach by increasing the number of products certified by MySTI to 300 products; roadshows at higher learning institutions by regional zone, namely the east coast, north, south, and Sabah and Sarawak. This initiative aims to attract and encourage R&D outputs from local university researchers to apply for MySTI certification. Thirdly, the sharing of success stories, through the sharing of companies' success stories, aims to build industry confidence in the value of MySTI certification and attract more industry players to take part. Next, I would like to move on to the question of the Honourable Member for Sungai Siput regarding the Chemistry Department of Malaysia. The Chemistry Department of Malaysia has one mobile laboratory unit based at its headquarters in Petaling Jaya. This mobile laboratory is equipped with scientific equipment capable of detecting and identifying chemicals in the field. The Johor State Chemistry Department and the Sarawak Chemistry Department each also have one mobile unit capable of detecting chemicals in the field. As for the Honourable Member for Jerantut, next year MOSTI will receive an allocation to upgrade existing laboratories, and plans are currently being prepared. As for the proposal of the Honourable Member for Rasah, it is greatly welcomed. The Chemistry Department will strengthen collaboration with the Department of Environment so that the sampling process, chemical analysis and issuance of chemical reports can be carried out promptly whenever a disaster or pollution occurs. For the information of the Honourable Member, the Chemistry Department is also capable of carrying out water quality monitoring analysis quickly and accurately. However, we take the proposal of the Honourable Member seriously and will apply to procure a dedicated mobile laboratory for water quality monitoring

Tuan Chang Lih KangPKR · PHTanjong MalimEN

air di zon utara iaitu Perlis, Kedah, Pulau Pinang dan Perak. The Chemistry Department (Jabatan Kimia) continuously strives to provide the best scientific services to government agencies, the private sector and the public in general. For narcotics analysis, the workload has increased by 100 per cent since the restructuring and the addition of positions in 2013. The increase in workload together with the complexity of narcotics analysis has caused delays in the issuance of chemical reports. I will give the example of the Honourable Member for Rasah. When we carry out narcotics analysis, we need to look for certified reference material, and most of the time, because there are many new narcotic substances or drugs, we have to look for that CRM or certified reference material, which is very, very expensive, high cost, and at the same time, always–– it is not easy to find or buy in the market. And that is wrong because...

Dr. Hajah Halimah AliPAS · PNKapar

[Bangun]

Before, before the Minister finishes, may I ask for a little way through, can I?

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Kapar first, Kubang Pasu.

Dr. Hajah Halimah AliPAS · PNKapar

Okey.

Boleh ya?

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Okay, Kubang Pasu.

Dr. Hajah Halimah AliPAS · PNKapar

Menteri, saya ada pengalaman di Kapar ini, di mana sungai menjadi kebiruan. Sebab ada efluen ke apa kan. So, the problem is how fast yang Jabatan Kimia, are you in collaboration dengan Alam Sekitar yet? Ataupun can you empower, empower Alam Sekitar or other inilah. Makna, now is your is the buck is with you kan? Boleh tak Alam Sekitar. Sebab penduduk akan–– kita akan adu kepada Alam Sekitar, we don’t find the kimia first-kan? Boleh tak permudahkan dan percepatkan proses itu. Terima kasih.

Okey boleh?

Tuan Chang Lih KangPKR · PHTanjong Malim

Berkaitan.

I am referring to the allocation for R&D. It is a major issue that needs focus for the future. Perhaps the Minister can comment. Another point is about strengthening MIMOS. Because right now R&D in semiconductors is everywhere. USM here, there and everywhere. So, we are not focused on how we

want to develop the NSS – National Strategy Semiconductor, and I propose that we strengthen MIMOS. MIMOS has many experts in electrical, electronic and other fields, and perhaps we can make it the technical leadership for the country. Like ETRI in Taiwan.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

Mr Speaker, perhaps I will answer two questions, then I will summarise. Those that cannot be answered, I will try to answer through written replies. And to answer the question from Kapar, we indeed work closely with JAS – Department of Environment. For example, when a disaster or river pollution occurs, JAS will take water samples, which are then sent to the Chemistry Department for us to carry out analysis. So, Chemistry will play a role in conducting that analysis. After that, we will send the report back to JAS. And this is indeed our modus operandi, and when there are narcotics cases, the police will send those samples to the Chemistry Department and the Chemistry Department will do the analysis. Because there are times when we can shorten or reduce the time. But there are times when–– there is a period that cannot be shortened. Because that is indeed the requirement for us to obtain accurate results, accurate analysis. Otherwise, say we need five days for these samples, we have to wait five days, that cannot be shortened. And that is why when we say the service charter for chemistry is 30 days, that is if it is empty, we start from scratch. But we have many cases, and when a narcotics case occurs, there are many, they will pour in. And each case has many samples. Perhaps there are 100 samples, 200 samples, and that will cause a backlog.

Tuan Chang Lih KangPKR · PHTanjong MalimEN

But Honourable Members, Mr Speaker, the management of the Chemistry Department together with the top leadership of MOSTI has taken note of this situation and is in the process of preparing a holistic working paper so that the process of issuing narcotics analysis reports can be expedited and the justice process can be hastened. The Malaysian MADANI Government also will— has acted swiftly by approving a procurement project for equipment to consolidate the service and integrate forensic science technology at the Chemistry Department of Malaysia, its headquarters, state offices and branches, amounting to RM69 million under the Thirteenth Malaysia Plan (RMK13). And that is why we see a

Tuan Chang Lih KangPKR · PHTanjong MalimEN

sharp increase in the development of STI services for next year. To answer the question from Kubang Pasu, we indeed hope we can make MIMOS a national R&D agency that can— that has a bigger role in developing the semiconductor and E&E sector. However, we also have constraints, especially in terms of allocation constraints. So, what we do, when given lemons, we make lemonade.

Minister, if we want to advance semiconductors, we have to— they have to give money.

Tuan Chang Lih KangPKR · PHTanjong Malim

Ya.

You have to lobby until you get it.

Tuan Chang Lih KangPKR · PHTanjong Malim

Ya.

Otherwise, we'll just stay like this forever. [Laughter]

Tuan Chang Lih KangPKR · PHTanjong MalimEN

But at the same time, Kubang Pasu, we are using a different approach. Apart from asking the government to provide 100 per cent of the funds, we are also using platforms such as Malaysia Science Endowment (MSE). Now Malaysia Science Endowment, together with industry players, has already set up or established a consortium, where we will provide matching grants. MSE will contribute RM90 million and industry players will contribute the same amount for us to jointly develop this semiconductor sector, yes. And Mr Speaker, there is still much that has not been answered in time. I hope we can provide written replies to all the Honourable Members who took part. And the Ministry of Science, Technology and Innovation (MOSTI) has taken note of every proposal and issue raised by all Honourable Members and is always striving and committed to taking proactive action on the matters raised. With that, I conclude my winding-up speech concerning the Ministry of Science, Technology and Innovation. All proposals and comments will be duly noted by the ministry. Thank you.

[Speaking without using the microphone]

Mr ChairmanEN

Alright, thank you, Minister. Honourable Member, the question is that the sum of RM759,683,800 for Head B.30 Operating Expenditure Estimates 2026 forming part of the Schedule be agreed to. [Question put and agreed to] [Head B.30 ordered to form part of the Schedule]

Mr ChairmanEN

The question is that the expenditure under Head P.30 Development Expenditure Estimates 2026 be approved. [Question put and agreed to] [Head P.30 forms part of the Estimates] [The Assembly resumed sitting] [Mr Speaker in the Chair]

Mr SpeakerEN

Alright. Honourable Members, there is an announcement. On Tuesday next week, which is 25 November 2025, I would like to inform that for the Ministers' Question Time, it will be answered only by the Honourable Ministers, as the Right Honourable Prime Minister will be making an official visit to Kenya on that date. Alright. Honourable Members, the sitting of the House today is adjourned until 10.00 a.m., Thursday, 20 November 2025. Assalamualaikum warahmatullahi taala wabarakatuh.

Beberapa AhliKetawa] Dato’ Haji Tajuddin Abdul Rahman [Pasir SalakEN

[Speaking without using the microphone]

[The House was adjourned at 6.25 p.m.]

Special ChamberSpecial Chamber

[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting]

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Non-Compliance of Insurance Companies with Their Responsibility to Pay Ongoing Medical Treatment Costs Deputy Speaker [Dato’ Dr. Ramli bin Dato’ Mohd Nor]: Please.Special Chamber

Yang Berhormat.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Mr Speaker.

Ipoh Timor proposes a motion under Standing Order 17 to discuss the need to review the legal provisions governing the regulation of the insurance industry, particularly concerning the failure of any insurance company to fulfil its contractual obligations for the continuing treatment payments of patients with chronic illnesses such as cancer.

This House is asked to take note of the existence of cases in which policyholders face rejection of treatment claims following action by insurance companies on the grounds that the patient is deemed to be in remission, with permission, and that the treatment is categorised as preventative or experimental. Such rejections raise major questions about the loose interpretation of the principle, the principle of medically necessary, which should protect the right of patients to receive continuing treatment.

There are also reports that, although policies set clear annual limits and lifetime coverage, the insurance companies concerned make only partial payments and label them as full and final settlement without providing detailed explanations, even though the patient's treatment is still ongoing. This situation raises doubts about the fairness and transparency of insurance companies' claims practices.

This matter demonstrates weaknesses in the regulatory structure and enforcement of the insurance industry under the purview of Bank Negara Malaysia and the Ministry of Finance, particularly in ensuring the implementation of

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

the principle of Treating Customers Fairly or TCF, which is outlined in the national financial sector policy. Therefore, this House is called upon to urge:

(i) the Ministry of Finance (MOF) through BNM – to investigate breaches of the principle of medically necessary by any insurance company and to review the need to strengthen or overhaul existing legal provisions so that they are more favourable to the public interest;

(ii) the Ministry of Health Malaysia (KKM) – to establish a clear national standard on the definition and approval of advanced treatment for cancer patients and patients with other chronic illnesses so that there is no dispute between medical and commercial interpretations; and

(iii) the Federal Government – to establish a code of practice for chronic health insurance claims to ensure that patients are not mistreated or marginalised as a result of narrow interpretations of policies, and thereby to guarantee the moral and ethical integrity in the health protection of Malaysians.

That concludes my speech, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Menteri, silakan.

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

Thank you, Dato' Yang di-Pertua. The Government takes note of the case raised by the Honourable Member for Ipoh Timor concerning the breach of the principle of medically necessary, with permission, by insurance companies. Generally, the Ministry of Health Malaysia (KKM) from time to time issues Clinical Practice Guidelines (CPGs), with permission, which serve as a reference for medical practitioners in providing treatment to patients.

Insurers and takaful operators or ITO are responsible for reviewing and managing policyholders' claims in accordance with contract terms, including verifying that the claims fall within the scope of procedures covered by the policy and are medically necessary, with permission. This review is carried out solely to verify what is covered and claimable based on treatment protocols generally accepted in accordance with CPGs, including those issued by the Ministry of Health Malaysia (KKM). However, it is important to understand that not all cancers and chronic illnesses have specific CPGs, because cancers and chronic illnesses are very diverse.

The process of producing CPGs is also complex and time-consuming, given that many studies and reviews of scientific evidence must be carried out by medical experts to produce a quality guideline based on clear scientific facts, or with permission, evidence-

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

based. At present, there are five CPGs relating to cancer and 18 CPGs relating to chronic illnesses.

Even with the existence of CPGs, medical treatment generally needs to be adjusted according to the clinical condition and individual needs of the patient. Therefore, treatment decisions cannot rely solely on guideline documents but must take into account the professional judgement or clinical judgement, with permission, of the treating medical practitioner.

In cases where treatment does not follow the usual treatment protocols, the ITO will conduct appropriate further reviews to understand the clinical reasons for such treatment. I wish to emphasise that the ITO and third-party administrators or TPA do not have the authority to determine patient care; rather, it remains the exclusive responsibility of doctors. Any disputes must be resolved by referring to the clinical judgement of the treating medical practitioner regarding the patient's condition, the insured amount or sum assured, sum insured, and the benefit package agreed upon, or with permission, the agreed benefit package.

Mr Speaker, to further improve the current insurance claims process, the Government, together with Bank Negara Malaysia and the medical industry, hospitals and ITO, has reactivated the Health Grievance Mechanism Committee, or with permission, Grievance Mechanism Committee or GMC.

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

This Committee functions as an industry platform to address operational and business practice issues. For example, it coordinates operational practices to reduce delays in issuing letters of guarantee and reviews cases where there are disputes over treatment that must be paid under the MHIT policy.

Based on discussions, the GMC may issue guidance as a reference for payers, medical practitioners and healthcare providers for similar cases in the future. In the near term, the GMC will prioritise the development of clear protocols for claims and adjudication processes to address the common disputes between hospitals, doctors and ITOs.

The protocols developed by this GMC will complement the CTG.

Among other things, they will clarify and improve the existing claims and adjudication processes to facilitate communication between ITOs and doctors.

Regarding policyholders' treatment plans for claims purposes. This aims to enhance transparency, reduce disputes and ensure alignment with KKM guidelines.

Dato' Yang di-Pertua, the Government takes note of the Honourable Member's proposal regarding the need to strengthen health insurance protection for patients with chronic illnesses. This issue is complex because it involves balancing inclusiveness, affordability and the sustainability of the insurance industry.

Therefore, a holistic approach is needed to ensure that the people have access to fair protection without undermining the sustainability of MHIT products. As part of this more holistic approach, the Government is developing a basic MHIT plan to be launched in early

Puan Lim Hui YingDAP · PHDeputy Minister of Finance · TanjongEN

2027 under the RESET strategy. This product will be developed with standardised benefits and policy terms and conditions to make it clearer and easier for all parties to understand.

Under this basic plan, the Government, together with the insurance and health industries, will also develop uniform and clear claim rules, or with permission, claim rules, to specify the treatments that can be claimed under this basic product. These claim rules will be developed together with the regulators, medical regulators and ITOs to ensure transparency and fairness in claims management. In addition, this will avoid confusion in the interpretation of policies and claims.

If policyholders have any complaints, they are advised to contact the ITO Complaints Unit first. If the response received is unsatisfactory, policyholders may contact BNMLINK. Based on current policy, a total of 190 complaints regarding MHIT from members of the public have been received by BNMLINK. Of this total, 94 per cent or 179 complaints have been resolved by the ITOs.

In addition, as an alternative assistance channel available, complainants may also submit disputes to the Financial Markets Ombudsman Service or FMOS free of charge. FMOS functions as a dispute resolution centre for consumers and financial investors nationwide. Policyholders also have the right to take legal action if, if they are still dissatisfied with the outcome reached.

If there is non-compliance with the required regulation and supervision, the Government will not hesitate to take firm action against the financial institutions involved. Such measures include prosecution, imposition of compounds, administrative monetary penalties or the issuance of warning letters. That concludes my speech, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Member, your question.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Honourable Deputy Minister. This case is very close to my heart because I have followed this case for two years. And allow me to draw the attention of this august House to the story of this individual and patient.

A pensioner, a victim. A victim of delay, a victim of confusion and a victim of the injustice of this industry's system is a customer of a company called Prudential. I repeat, Prudential. Not another, just this case. A pensioner, he is a civil servant pensioner and he has submitted his claim to Prudential for two years.

The claim was left unanswered. Calls went unanswered, letters were not replied to, and even the claim letters were ignored. After I helped to intervene, he only received 2,270 out of more than 5,000 that had been spent, which should have been claimed from Prudential. This is for two years. What has been diagnosed and what has been given, advised and directed by doctors, the treatment required, is for two years; more than 5,000, and there are still eight more years of treatment to be given, which he has to pay for.

This is a cancer patient who, just two years ago, received mastectomy treatment. The patient's oncologist has issued

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

several letters explaining that this cancer adjuvant therapy will need to continue for another eight years. Every six months the patient needs blood tests, ultrasound scans and X-rays to assess the patient's condition and the disease.

And all of these are medically necessary according to the oncologist.

However, Prudential has used technical reasons against policy one and policy two, where they are trying to distort the meaning of the "as charged" benefit. Yet that is the promise that made the patient buy the second policy, with a coverage value of one tenth — 1.5 million for life. The first policy, meanwhile, was only 50,000 a year. Both policies, he has paid the premiums without fail since day one, using a small government pension, yet still honest.

Even more heartbreaking, the first CT scan after chemotherapy, the most basic test to determine whether the treatment is effective, was also rejected by Prudential. According to Prudential's own definition, medically necessary is treatment consistent with the diagnosis and in line with accepted medical practice.

The patient's oncologist, meanwhile, relies on NCCN guidelines, the global standard for cancer treatment. Nothing could be clearer than that. So, why was he rejected? Why is this pensioner forced to pay out of his own pocket when it is the policy that was sold to him with the slogan "as charged". Why are insurance companies allowed to act as if the contract definition does not apply to them?

And Mr Speaker, I would like to seek a view. I understand, I do not want — I do not wish to name the patient because I respect his privacy. But insurance companies must be held accountable because the product sold is not the service it provides. And a few questions: is it — I listened earlier with attention and diligence. There is, in 2027, MHIT, there is a strategy to help or avoid such cases from occurring. But between now and 2027, what is the strategy of the government and MOF to prevent ordinary people who are struggling under the current cost of living pressure from being able to avoid and no longer being deceived or mistreated by the fine print, fine print that is heavily exploited by these large companies that are able to lawyer up, with permission, when challenged in cases like these.

Second, I appeal for this case, and I am confident that the complainant has already submitted an appeal to BNM. I will not repeat the references, but I hope this case can be used as a reference, and even turned into a case study for the Grievance Mechanism Committee mentioned earlier by the Honourable Minister, so that at least cases that are similar or identical to this one can be given a determination and also a judgement, if there is room for it, so that people like this will no longer be mistreated. And finally. I want to ask. In the process of any insurance company, claims, determinations or judgements that are to be settled or rejected by that panel, is it required that the panel has an oncologist?

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Because what I know in this case, the panel that rejected this claim did not have an oncologist. Even if it had

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

an oncologist, the response I received from the Honourable Minister earlier was indeed accurate. The information from the treating medical practitioner should be the one provided, the highest authority in any matter, to the patient regarding that patient's treatment.

So, whether the panel that rejected the claim had an oncologist or not, is it more knowledgeable, more authoritative than the doctor treating the patient, who has issued a letter stating that this adjuvant therapy is an obligation for the next 10 years? And why was this panel, which has no oncologist and no medical history of this patient, given the power to reject the claim of this vulnerable patient?

That concludes my speech, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Timbalan Menteri.

Puan Lim Hui YingDAP · PHTanjongEN

Thank you, Dato' Yang di-Pertua. Thank you to the Honourable Member for Ipoh Timor. As the Honourable Member for Ipoh Timur mentioned regarding this specific case, for the information of Dato' Yang di-Pertua, our side has only just received the complaint formally and we will look into the case and will get in touch with the Honourable Member.

But, before this, perhaps regarding other points, I would like to emphasise here one of the main strategies to protect the rights of policyholders — which is one of the things the Honourable Member asked about. As users of MHIT products, this is by implementing higher MHIT business practice standards. This includes improving the Product Disclosure Sheet, or with permission, PDS, to enhance users' understanding. The MHIT product PDS has been designed to guide users to consider five main matters before subscribing to an MHIT product, namely, first, the key features of the product to be subscribed to, the benefits of the product, an assessment of suitability based on the user's needs, risks, exclusions and limitations.

Third, awareness of long-term affordability, including projections of premium increases and the factors contributing to the increase in premiums. Fourth, key terms and conditions, including the free look period, with permission, the waiting period, with permission, and the commission paid. And fifth, confirmation of the product's suitability based on other available options. In this regard, information to users must be delivered in a form that complies with the standards set by Bank Negara Malaysia to ensure that important information is presented clearly, accurately and prominently directed to policyholders.

In addition, need-based selling policies, or with permission, need-based selling, have also been strengthened to reduce the risk of selling products beyond users' means. The Government, through Bank Negara, has also provided additional guidance on resetting premium rates or contributions to make them more objective and consistent.

Users who face difficulties in continuing premium or contribution payments are encouraged to contact their respective ITOs

Puan Lim Hui YingDAP · PHTanjongEN

. If they do not receive satisfactory service from the ITO, complaints may also be channelled to BNMLINK.

Starting 15 August 2025, the Credit Counselling and Debt Management Agency or AKPK has launched a new advisory service to help users affected by premium increases due to age transition. Through this service, AKPK offers a comprehensive financial health analysis that is suited to the users' financial situation, and helps users understand the options that suit their respective circumstances. This advisory service can be accessed free of charge at any AKPK branch.

So, here the Ministry of Finance together with Bank Negara Malaysia are truly committed to ensuring that all of this is carried out or implemented fairly and equitably. That concludes my speech, thank you.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Balancing Natural Resource Policy and Open Market for Critical MineralsSpecial Chamber

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Member.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you. Thank you, the Honourable Minister. Mr Speaker, the issue of managing and aggregating, aggregation-lah, critical minerals in Malaysia is becoming increasingly urgent. We are talking about strategic resources such as rare earths, which form the backbone of green technology and the nation's future energy security, and indeed the world's.

However, to establish a national aggregator, with permission, for critical minerals under the Federal Government is not an easy matter.

I understand. It involves many agencies, state interests and also regulatory issues.

In this situation, I would like to propose a more realistic approach, based on a model such as the Shanghai Metals Market. That market began as a data collector and aggregator of various non-ferrous metals, and then grew into a regionally recognised open market.

Malaysia can study the same model. We can establish a Malaysian critical minerals market regulated by the Securities Commission (SC), with the involvement of Bursa Malaysia and the Ministry of Finance. This platform would function as an open market, not a government-owned entity, yet remain under the supervision of the country's major financial institutions.

Through this platform, we can set a national reference price for critical minerals, firstly. Secondly, improve the transparency of supply chains and ESG compliance. Thirdly, attract local and international investors into Malaysia's minerals market. However, to complete this initiative, I would like to put forward several matters to the Ministry of Natural Resources and Environmental Sustainability (NRES).

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

(i) has the ministry drawn up a national database for all critical minerals that are being mined, stored or exported? Without accurate data, it is difficult to determine the true value of the nation's resources;

(ii) to what extent is coordination between the state governments and the Federal Government in the licensing and reporting of mineral production under way? This is important to avoid policy conflicts that could undermine investor confidence;

(iii) what concrete steps are being taken to set national ESG standards in critical mineral mining so that they are aligned with the requirements of global investors?; and finally

(iv) I hope the ministry can provide a clear direction so that efforts towards establishing this open market can proceed in step with the country's natural resource policy.

With orderly steps, Malaysia can emerge as a regional hub for the transparent, sustainable and competitive trade of critical minerals. That is all, thank you.

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

Thank you. A good question. For the Honourable Member's information, the Ministry of Natural Resources and Environmental Sustainability acknowledges that the development of the critical minerals industry, particularly rare earth elements for example, requires accurate, uniform and easily accessible data to support the management of natural resources in the country in a more orderly and competitive manner.

This need is in line with global developments that demand transparency in supply chains, given that critical minerals are an important component in technology, clean energy and electric vehicles, magnets and so on, depending on the types of minerals we extract from our country.

In this context, the provision of a national database is an essential foundation for strengthening industry governance and investor confidence.

Without data, it is almost impossible for us to have a platform for people to do some reference for our products.

Let me give an example to the Honourable Member. If we still remember, our country was once the largest rubber producer. So, any rubber transaction would come to the Kuala Lumpur Stock Exchange first before it became Bursa. But when we were no longer the largest producer, it moved elsewhere.

The same goes for palm oil. Because we are one of the largest producing countries, we can establish a platform like a Bursa, what market is it, the Bursa market for future prices of CPO.

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

We are one of the reference points at Bursa Malaysia. Because we can do that, because we are the largest producer, right. Now, if we were not the largest producer, it would mean we must have a network with other major producers. Typically, if a country has no production at all, it must become a financial centre. So, everyone goes to refer to them and register their minerals.

As for us, we have many minerals. Because your question is more about minerals as a whole, yes. We have various minerals. They fall into the categories of metallic minerals and non-metallic minerals. So, I will read them out so that we have knowledge of what minerals exist in our country. Our country does not have only REE, you know. REE is new.

Bauxite, gold, iron ore, these are the major ones I have mentioned. Rare earth, tin.

Then for non-metallic minerals, aggregates, clay, limestone, sand and gravel, silica sand and the rest, or other small ones, well. Various ones, silver and all that. All of these, for the Honourable Member's information, each one contributes not even one percent of world production. So, we cannot be a reference point for them.

Unlike, say, palm oil. We are the second largest producer and we have the most sustainable production. So, a good reference point. That is why in Indonesia, although it is the biggest palm oil producer, at 50 million metric tonnes, while we only have just over 19 million, we become the reference point. The answer to the Honourable Member's next question, which is question number two, asks to what extent coordination between the state and Federal governments in the licensing, reporting and production of minerals is under way. For the Honourable Member's information, the Ministry of Natural Resources and Environmental Sustainability wishes to clarify that in principle, management of land and any minerals falls under the jurisdiction of the state governments under the Federal Constitution. Meanwhile, the Federal side, such as the NRES Ministry and the Department of Minerals and Geoscience, is responsible for technical regulation. For example, what? EIA, they have to come to the Federal side. That's one.

Number two, industry development. So, they will come and meet us, and we will consider what the best incentives are to give investors so that they can extract not only our upstream, midstream and downstream. That they must go to the Federal side. The state government cannot decide. Third, if you want to export, that must get Federal approval.

All the others, whether mining licensing, mining leases, exploration permits, will all be determined by the state government. So, those are the two major things that occur between the Federal and the state. So, say the Federal side brings in an investor, and then he says, we want to open in Perak, for example.

But if the Perak state government does not agree, it will not happen. If we want to give him incentives to open there, he, if the Perak state government does not agree, it will not happen.

Likewise, if the Perak state wants to do something, and then wants the government to approve exporting our minerals raw, if the government says no, no. The Federal government does not allow it, does not allow it. Because the Federal Government wants all these natural resources, we must see how we can benefit not only from raw materials, yes. We want to see how upstream can be taken into midstream, and then downstream. That is the conceptual framework we have.

Datuk Seri Johari bin Abdul GhaniUMNO · BNMinister of Plantation and Commodities · TitiwangsaEN

Up to today there has not been much conflict or dispute, because the Federal Government usually encourages any investment to go to the state, because that is where the source is. There is no point in you giving approval to the state of Perak when the source comes from Pahang. So, that is not usually our concept.

And finally, number three, what concrete steps are being taken to set national ESG standards in critical mineral mining so that they are aligned with the requirements of global investors. As I mentioned earlier, the country has a commitment to the United Nations UNFCC that the environment is a key factor in any economic development we undertake, not like before. Before, when we first became independent, our forest cover was 80, 90 percent. So, we made a commitment with the United Nations in 1992 that we would keep our forest cover at not less than 50 percent. Where are we now?

We are only 54 percent now. So, there is not much more room to go. Therefore, with this ESG, it can help us encourage any industrial company involved in our country to prioritise ESG and also move towards low-carbon operations in order to protect the environment.

And third, we also ensure that all our Permanent Forest Reserves must not be encroached upon or exploited without obtaining proper EIA approval, and also without causing impact to other industries, because we do not comply environmentally within the country. Thus, our status will fall, because it appears we are not improving our capacity to show our participation in terms of our ESG. Thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)

Yang Berhormat.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, the Honourable Minister. An excellent answer. But I would like, with your permission, to explore this idea more deeply.

Because for me, if we use, not as an excuse but using the concept, we need to have critical mass to become a reference point for the world. Outside China and most rare earths, for example, take Shanghai Non-Ferrous Metal. But outside China, Shanghai Non-Ferrous Metal is indeed more inclined towards a China-based internal market, because that is the only one that really exists.

But outside China, the largest production of rare earth products. That means from REO downstream, REO to product, product RE, there are DPR, PRNB and so on. Actually, Malaysia is the largest market and largest producer through Lynas. So, to scale, to give space, using scale to give us space as a reference point, actually exists, but in terms of REC upwards we do not yet have it. That is accepted, that is accepted. But I think it is fortunate that there is that as a foundation, so that we can explore the whole concept and idea. But for us to reach the level where we can produce and process on a large scale, as in the government policy that I support 100 percent, I think what is needed is something like what the US does. Something that Australia does, called the Critical Minerals Mapping Initiative (CMMI), where, on the basis of making

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

something, or identifying the path finder elements close to rare earths as an example, and also conducting extensive minerals potential mapping using eight or nine different types of geospatial mapping, using sophisticated scanners that we may not yet have the technology for.

But with the help of friends from Australia, from the US, from China, from Belgium, from France, perhaps we can carry out geospatial scanning and mapping of minerals, potential mapping and path finder element identification, so that the transparency that is needed can be achieved, because in mining, basically, transparency of data is the key to access to capital and investment. And I think, is the government planning anything to do this? I know that getting support from the state level is indeed complicated, not easy, difficult. Even so, I think a CMMI for Malaysia is something necessary. And I want to ask whether the government has any plans to launch a CMMI for Malaysia.

And last, if I am not mistaken, the Honourable Minister had the opportunity to visit an initiative under UTP, in cooperation with UTP and Greensnow, to explore what I brought up in the House that day, the Bio Intelligence Leaching Solution (BILS), if I am not mistaken. That will, with permission, revolutionise the entire notion, concept and technology of in-situ leaching, where our current concerns that ISL will harm the environment may be reduced in risk.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

I seek a little guidance, a little view from the Honourable Minister.

What is the status of the study, or what is this, engagement between the ministry and the Honourable Minister with them at UTP, and whether they will be given space to upgrade their cooperation or their contribution to the rare earth mining ecosystem in Malaysia. That is all. Thank you.

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

Thank you. Thank you, Honourable Member. First, I want to touch a little on the position of REE. Today, based on our inferred mapping and estimates, which are not accurate, inferred.

That is where we have established approximately RM16.1 million of REE elements that we can extract. Now, when we process them into REC, today the estimated value of REC per tonne is about USD6,000. Alright. So, what do we have here? We indeed have no experience in doing REE mining through in-situ leaching.

We rely on China.

Now, what happened in China? When they came here, approved by the state government in 2019, and the Federal Government at that time also gave approval. Because we know we have a large REE stock but we have no experience in mining, let alone in terms of midstream and also downstream. So, midstream and downstream, we think about later, and then we want to see how we can do mining.

So, at that time, the investor from China came, and what did he do? He asked for approval from the state government, so the Federal side gave approval in terms of EIA and also export of REC. Because at that time we had no midstream, and he promised that one day, if he could do it, he would build midstream here and build downstream, but Lynas is different. He goes, raw REE

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

That one is in Australia. He just set up a separation plant. He takes it and he does it.

This one, we start from upstream.

Now, when he did this, earlier our EIA was approved based on his waste being one becquerel and below. That means his radioactivity was one becquerel and below. So, the state government gave approval. We also approved the EIA. Then, what happened? When he carried out this product extraction through in-situ leaching, he used all kinds of chemicals and people have to go and investigate what happened. What types of chemicals he used, as he declared to us earlier.

Today his waste has risen from one becquerel and below to 10, 12, 13 becquerel. That is very high radioactivity. And then, we looked at this in-situ leaching process, at how he handles his waste. Where does this waste go? This waste flows mixed in and enters the river.

So, just yesterday. Today is Wednesday, last Friday. The Cabinet made a decision, approving my request to suspend the operations of MREC and Rahman Hydraulic for three weeks, because we want to go and see why the Perak River at Kenering turned blue. So, the initial investigation showed that the blue water at MREC is the same colour as the river. So, this is what they are investigating now, and we have just suspended it for three weeks. For what? To check, to see why. So, we want that when we carry out our development projects today, we must be very sure of our mining procedures, we must be very clear to investors. They cannot come, then we change, then we change again. This is what happened. So, what I want to emphasise is that I agree with the Honourable Member's proposal to bring in from the university UNP...

[Interjection] Ha, UTP. If there is one, a bio solution for in-situ leaching, I will come, we can meet with the Department of Minerals and Geoscience, and we can carry out an in-situ leaching process in Perak. We will see how successful it is. But for your information, for the Honourable Member's information, according to the feedback I received, if you want it to be quick and abundant, the stronger the acid you inject together with the water, the more it comes out. So, when we want the strong and very concentrated chemicals that we use, it will extract all the minerals including thorium and also uranium. So, if we use reduced ones, perhaps it cannot extract uranium and thorium. So, that is the reason why the becquerel went from about one and below in the original to 10. So, we do not know what chemical he used that caused the concentrated one to increase so high.

So, these are the issues, because we do not want the state government to get only RM100 million in royalties. Our investor brought out, so far for the three and a half years, 23,000 metric tonnes of REE. What is the value? RM580 million. So, when he brings out 500 million, he processes it and then from there he pap, pap, pap, that one is another billion. But we only get RM100 million.

What we are dealing with now is waste. What we want to deal with is the river that turned blue. So, these are all matters that we must ensure, so that we do not rush, because the REE is already there. No one can touch it. But the most important thing is that when we do this, we must make sure it does not have an effect on the community, as happened in Bukit Merah before,

Datuk Seri Johari bin Abdul GhaniUMNO · BNTitiwangsaEN

We had one in 1982. And then the whole place had to be sealed because waste management was very poor, affecting the community because the waste went into the river.

And secondly, we have another case, namely the copper mining in Ranau, Sabah.

Until today we have a lake of 500 feet, and not a single fish can live in it until today. So, we do not want that to happen. So, of course it takes time because we do not have the experience, we have to be fair.

So, I have discussed with the Forest Research Institute Malaysia (FRIM), and FRIM has been tasked to study the environmental impact on the Permanent Forest Reserve. Because this permanent forest reserve holds almost 94 per cent of the 16.17 million metric tonnes of potential REE.

So, he has to carry out this mining, he needs to go and study what happens to the Permanent Forest Reserve if we take, say, 5,000 hectares or 2,000 hectares or 1,000 hectares. What is the implication after mining or during mining? That is what we are looking at now.

So, as for the bio one, I will come to see. The likelihood is, usually if this bio one is effective, if the chemical experts can extract, what, 10,000 tonnes.

Maybe if we use this bio one, even if it is a bulk of 5,000 tonnes, it's okay because we can adjust the price. Right? That's all. Thank you.

Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Status and Plan for Relocation of Tamil National-Type School Ladang Sungai Muar, Segamat, JohorSpecial Chamber

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Member.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Thank you, Mr Speaker. To the Honourable Deputy Minister, the Tamil National-Type School (SJK(T)) Ladang Sungai Muar has been in operation since 1926 in the interior of the estate, approximately seven kilometres from the main road. With physical conditions that are no longer suitable for present-day educational needs. The school site is small at 0.5 acres and is often hit by floods, which threatens the safety of pupils and teachers, and in addition limits the development of basic facilities such as a field and additional classrooms.

The Ministry of Education Malaysia (KPM) has approved the application to relocate the site through a letter dated 16 November 2020 to Lot PTD 16939, Mukim Buloh Kasap, Segamat, measuring five acres, but the construction funds have not yet been approved or a solution found until now. I have submitted official letters to the Honourable Minister of Education three times, namely in 2021, 2023 and 16 July 2024, and have raised the issue of this school repeatedly every session in Parliamentary debates, requesting that this project be listed in the budget every year.

However, until now there has still been no official announcement or implementation. This issue involves the public interest, particularly the right to education and the safety of pupils in rural Segamat.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

This school now has nearly around 45 to 50 students, yes.

That number is expected to increase by at least 50 to 65 per cent if it relocates to a new, more strategic site near the main road. This relocation will also resolve the problem of access and the high transport costs for parents.

More than four years after the approval of the new site was received, it is proper that there be an official explanation and a clear commitment from the Honourable Minister of Education and the MOE so that implementation is no longer delayed. And therefore, the question

(i) when is the relocation and construction of SJK(T) Ladang Sungai Muar expected to officially begin?;

(ii) what is the overall project duration and the latest status of the planning, procurement and appointment of the contractor process, if any?;

(iii) what is the total cost allocated for the construction of the new school?;

(iv) has this project been listed under the Budget 2026 allocation or in the Thirteenth Malaysia Plan (RMK13)?; and lastly

(v) what follow-up action has the ministry taken to ensure this project is no longer delayed after several years of waiting for funding approval?

I request that the ministry provide an official explanation and a guarantee of implementation to the people of Segamat and the school community concerned. That is all, thank you.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

The Honourable Minister, please.

Tuan Wong Kah WohDAP · PHDeputy Minister of Education · TaipingEN

Thank you, Dato' Yang di-Pertua. Thank you, the Honourable Member for Segamat. SJK(T) Ladang Sungai Muar, Segamat, is a Government-Aided School and an under-enrolled school with an enrolment of 37 pupils and six classrooms. The school was established on 1 January 1927.

Under section 2 of the Education Act 1996, a Government-Aided School is defined as a school that receives capital grants and full aid grants. And the KPM channels maintenance aid grants for the premises of Government-Aided Schools, subject to the existing allocations provided by the government through the annual budget. In line with its status as a Government-Aided School, for the purposes of relocation, building construction and the provision of equipment for a Government-Aided School, namely in this case SJK(T) Ladang Sungai Muar, it falls under the School Management Board (LPS) or the school's sponsor.

Tuan Wong Kah WohDAP · PHDeputy Minister of Education · TaipingEN

And the KPM, on 22 October 2020, and — has indeed given approval through a notification letter dated 12 November 2020 to SJK(T) Ladang Sungai Muar to relocate. The approval was for relocation to the new site on Lot PTD 16939, Mukim Buloh Kasap, district of Segamat, measuring five acres. In that approval, the conditions attached to the approval were set out, namely:

(i) the KPM shall not be held responsible if financial problems arise as a result of the relocation;

(ii) the proposed site must be in line with what was submitted in the original application to the State Education Department (JPN); and

(iii) this approval is subject to a period of two years from the date of approval by the Registrar-General, and if no action is taken within that period, the approval shall be void and must be reapplied for.

Throughout this time, according to the KPM's records, the KPM has not received any construction application from the LPS or the school. And secondly, once this application has lapsed after two years, if the school wishes to — wants to proceed with this relocation, a new application must be submitted. Thank you, Dato' Yang di-Pertua.

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

Thank you, Mr Speaker. Thank you, the Honourable Deputy Minister. Regarding this school, I too have just received a letter. The date — because the issue was for, for the construction from SBM to SBK.

The school itself has in fact agreed, and based on several factors.

It is not only SJK(T) Ladang Sungai Muar but also several Tamil schools and Chinese schools, because most of these schools are located on estates, it's on private land, where we are worried that in the future a land issue will arise, or the company will say you cannot operate, and then the issues come up.

Therefore, I was — I was informed. First, the school sent a letter in which to change from SBM to SBK; the letters are attached, in 2019, the first one.

Second, the most recent, the school's LPS and PIBG also sent a letter on 22 December 2024 stating that the school agrees to change its status from SBM to SBK. Because I think every LPS or PIBG changes often, yes, every few years. So, this issue has stalled. And I have also given the chronology and the documents to the Honourable Deputy Minister.

And I thank the Honourable Deputy Minister for being consistent regarding the issue of this school. However, we are worried because in the Segamat Parliamentary constituency we have six Tamil schools. And all these under-enrolment issues, we can resolve if this school is relocated to the main road. And this school is among the cluster schools in the Segamat district, which has 12 Tamil schools. I think this can help us to

Tuan Yuneswaran a/l RamarajPKR · PHSegamatEN

maintain the status of this school so that we can look for a solution. That is the first.

Secondly, I would also like to ask about other schools in the future, for the ministry to also check with the SB — the Capital-Aid School (SBM), whether they wish to remain permanently as Capital-Aid Schools. Because perhaps every time the LPS Chairman changes, the PIBG Chairman changes, then we do not know the chronology.

Suddenly, oh, we want to change.

So, I think, as a Member of Parliament, I also suggest to the government that every few years it must also review whether the government — these capital-aid schools want to continue or want to change status? Perhaps I do not know, perhaps it has happened. Perhaps the Minister can help to clarify the three matters I have raised. Thank you.

Tuan Wong Kah WohDAP · PHTaipingEN

Thank you. Thank you, Dato' Yang di-Pertua.

Thank you to the Honourable Member for Segamat for the proposal and also the questions that have been raised.

Number one, regarding under-enrolled schools such as SJK(T) Ladang Sungai Muar, Segamat, which has an enrolment of about 37 pupils this year. Indeed, the KPM's approach to handling or addressing the issue of under-enrolled schools is, among others, to consider and approve applications for relocation. And indeed I see that the Honourable Member for Segamat understands very well that if this school can be relocated to a new site, it may be able to attract higher enrolment. And indeed that is something very welcome to the KPM.

However, on this matter, I am also informed that the Honourable Member for Segamat sent documents to me regarding the application in 2019 and also recently, December 2024, concerning the agreement or application from the LPS and also the parents to change the status of this school from Government-Aided School to a government school. Because we are well aware that for a school to be included in the budget or included in the RMK, then one of the school's statuses, under the existing Education Act, is that all projects under the RKM are for government schools, namely land owned by the government, buildings owned by the government, schools owned by the government. And unlike a Government-Aided School whose responsibility lies on the shoulders of the School Management Board.

So, for SJK(T) Ladang Sungai Muar, Segamat, I propose that after this, the Honourable Member and the School Management Board can hold a meeting with us to set the direction. And if the school wishes to change its status to a government school, then we will kick-start the application and from there the KPM will examine whether we are able to make an application or a plan in the next RMK. But all of that depends on local needs and at the same time also depends on the allocation and the existing financial status of the government. So, we can discuss this issue.

Tuan Wong Kah WohDAP · PHTaipingEN

And regarding the other schools mentioned by the Honourable Member, a good proposal. The KPM will examine it. However, for Government-Aided Schools such as SJK(T) Ladang Sungai Muar, I would also like to put on record, with permission, that indeed every year for SJK(T) Ladang Sungai Muar, Segamat. Every year the KPM channels maintenance aid grants.

Tuan Wong Kah WohDAP · PHTaipingEN

This year the KPM approved RM50,000. It has already arrived. I believe the work has already been completed. Last year RM80,000 for this school, and last year there was also a special allocation of RM70,000 for toilets. And we were informed by the school that the Honourable Member for Segamat himself had also handed over RM100,000 to the school for maintenance purposes. The KPM extends its appreciation to everyone.

And the KPM wishes to emphasise that all streams of schools as enshrined in — under this Education Act, we will give due focus and attention. And indeed I have answered in the Dewan Rakyat before that under RMK13, our RP1 has approved a rebuilding of a dilapidated building, namely in Perak, SJK(T) Gopeng, with the scope of demolishing 30 existing dilapidated building blocks and building replacement building blocks, six classrooms, administrative offices and so on, with an allocation of RM14 million.

And in these past few years too, projects that previously stalled have been continued by the KPM, and as has been reported, many Tamil National-Type Schools have already started operating in new buildings. Thank you, Dato' Yang di-Pertua.

Deputy Speaker (Dato’ Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Members, with that the Special Chamber sitting for today is concluded. The Special Chamber today is adjourned until Thursday, 20 November 2025, at 2.30 p.m.

[Special Chamber adjourned at 3.31 p.m.]