Oral QuestionsQuestions
[Reads a prayer] Bismillahirrahmanirrahim. Assalamualaikum, Honourable Member, welcome back to the House. We begin today's sitting with oral questions. To open proceedings, I invite Mr Oscar Ling Chai Yew, the Honourable Member for Sibu.
Thank you, Deputy Speaker. My question is number 1.
1. Mr Oscar Ling Chai Yew [Sibu] asks the Minister of Transport to state the current status of the Port of Bintulu and the amount paid by the Sarawak State Government to acquire the Port of Bintulu.
The Minister of Transport is invited to speak.
Mr Speaker, greetings of peace, greetings of Malaysia MADANI, Honourable Members. For the information of the Honourable Members, the Port of Bintulu currently still has the status of a Federal Port and is under the regulation of the Bintulu Port Authority until the Bintulu Port Authority (Dissolution) Act 2024, or Act 859, is enforced. The Federal Government and the state government are at the final stage in the process of handing over the Port of Bintulu to the Sarawak State Government. At present, the Technical Committee established and co-chaired by the Federal Government and the state government is still refining
the legal aspects to ensure that all obligations are fulfilled by both parties as provided under the Bintulu Port Authority (Dissolution) Act [Act 859] before giving the date of enforcement of that Act, to enable the Sarawak State Government to take over or regulate and administer the Port of Bintulu. The Federal Government has determined the payment value and payment method to be adopted by the Sarawak State Government for the purpose of taking over the Port of Bintulu. I am pleased to inform the Honourable Members that the Federal Government and the state government have, in principle, agreed on the value of RM1.8 billion for that purpose. Thank you.
Alright. Honourable Member, supplementary question.
My supplementary question. Once the Port of Bintulu has been acquired by the Sarawak Government, will the Federal Government continue to assist, perhaps in terms of providing land or in other ways, so that the Port of Bintulu will continue to grow and develop under the management of the Sarawak Government? The Port of Bintulu can become an important gateway for Sarawak to the international level, just as ports are an important infrastructure access for attracting foreign investors and also ensuring the economic development of Sarawak.
Please, Honourable Minister.
Thank you, Mr Speaker. Firstly, for the information of the Honourable Members, the question of providing funds does not arise. In fact, Federal Ports, whichever they are, do not receive any form of fund payment from the Federal Government because, first, the operators of these ports are private companies. In the case of Bintulu, Bintulu Port—there is Bintulu Port Berhad which operates the port. The Bintulu Port Authority is the regulatory body. So, what we are handing over to the Sarawak Government is the regulatory body or the port authority, and the Bintulu Port Authority will receive a concession payment every year from the company holding the concession. So,
any investment to expand the port will be carried out by the concession company, the company holding the concession. So, it does not arise that the Bintulu Port Authority requires funds from the Federal Government. In fact, they will continue to receive concession payments from the company operating the port. Thank you.
Please, Honourable Member.
Jerantut.
Jerantut.
Thank you, Dato' Deputy Speaker. Thank you, Honourable Minister. We understand the total takeover amount is RM1.8 billion. This is a very large amount and it has already been agreed at both the state and Federal levels. So, the question is, is the government prepared to disclose the details of the agreement, at least at the level of the Special Parliamentary Committee, including the payment structure, the assets involved, or the liabilities transferred. What is the government's guarantee that this RM1.8 billion transaction will not burden the state government and will not have a long-term fiscal impact on the people of Sarawak. Thank you.
Silakan Menteri.
Mr Speaker, first, in terms of the aspects of asset valuation and so on, it is still being refined between the Federal Government and the Sarawak State Government. We have several mechanisms, there is a Technical Committee, there is a Working Committee and then there is a Special Committee co-chaired by myself and the Deputy Premier of Sarawak, Datuk Amar Douglas. So, all of this will be detailed in the near future before it can be finalised by both state governments, because this is an agreement between the Federal Government and the state government. So, it is up to both parties, the agreement of both parties, namely the Federal Government and the state government, whether to disclose that information. On behalf of the Ministry of Transport, we have no problem, we stand guided. So, there is nothing we need to hide.
All of this is being carried out on a very transparent basis because—and this transaction involves G2G: the Federal Government and the state government. It does not involve the private sector. So, as for whether the Sarawak Government is capable or not, I think the Honourable Member need not worry. The Sarawak Government is not worried. The Sarawak Government—Sarawak certainly has the capacity to pay that amount. In fact, what has been agreed is an amount that was agreed between the Right Honourable Prime Minister and the Right Honourable Premier after several rounds of negotiations. So, I am confident of the financial capacity of the Sarawak Government to pay that lump sum. In fact, they want to pay the lump sum to the Federal Government and we welcome this. So, I think there is no fiscal problem for the Sarawak Government and this does not pose a financial problem for them in the long term because the Bintulu Port Authority will also generate income every year from the concession company. Thank you.
Thank you, Honourable Minister. We move to the second question. I now invite Mr Haji Wan Hassan bin Mohd Ramli, the Honourable Member for Dungun.
Thank you, Deputy Speaker. My question is number 2.
2. Mr Haji Wan Hassan bin Mohd Ramli [Dungun] asks the Minister of Tourism, Arts and Culture to state the latest statistics and total number of houses sold to foreigners through the Malaysia My Second Home (MM2H) programme from 2023 to 2025, by category of their country of origin, and the number who have obtained citizenship.
Please, Minister of Tourism, Arts and Culture.
Thank you, Honourable Member for Dungun. Mr Speaker, for the information of the Honourable Members, up to today, the MM2H programme has never granted citizenship applications. Permanent residence or MyPR is a Long-Term Social Visit Pass (Pas Lawatan Sosial Jangka Panjang) programme with multiple entry visa facilities that allows foreign nationals to live in Malaysia for a period of five to 20 years through four categories.
First: platinum 20 years; gold 15 years; silver five years; and special economic zone 10 years. The pass endorsement period for all categories is five years for each session, and participants may renew up to the end of the period of their respective categories. Participants are also allowed to extend every five years if they are still interested. Up to 31 December 2025, a total of 744 MM2H participants have purchased houses under this programme, while 2,637 other participants are still in the process of purchase, including finalising sale and purchase agreements and identifying suitable house locations. As for the total house purchases by MM2H programme participants, the new policy by country up to 31 December 2025 is as follows. Mr Speaker, if possible, I will read out the top 10 countries. For the rest, I will provide in writing. As for all other places, there are nearly 50 countries...
Silakan.
One, China 304; Taiwan 91; Singapore 63; United States 41; United Kingdom 40; Hong Kong 34; Australia 29; Bangladesh 19; South Korea 15; Indonesia 14 and also Japan 14. That is all, thank you.
Honourable Member, supplementary question.
Thank you, Minister, for the answer given. The question is, has the ministry also assessed the pressure on the level of home ownership ability, particularly for local buyers with moderate incomes, as a result of increased demand in certain price segments? Thank you, Deputy Speaker.
Please, Honourable Minister.
We do have a set of bottom line. For example, the platinum one, they must want two million and above. For gold, it must be more than one million and above. So, we are also subject to the states determining where MM2H buyers may purchase the houses. Thank you.
[Bangun]
Honourable Member for Tampin.
Thank you, Dato' Deputy Speaker. Honourable Minister, up to the first quarter of last year, Taiwan and China occupied the first and second places as the countries with the largest and highest number of applications, followed by Singapore in third place. I have also been informed that the first MM2H one-stop centre has also been set up at TRX to facilitate the registration application process. My question to the Honourable Minister, regarding this MM2H programme, what is MOTAC's plan to break the dominance of participation from source countries such as Taiwan and China? And how far is MOTAC's effort to focus on or promote this programme in Middle Eastern countries? Thank you, Dato' Deputy Speaker.
Please, Honourable Minister.
Thank you, Honourable Member. We indeed open MM2H for people to apply across the whole world, for all of the world, not only for China and Taiwan. Don't be in cahoots, wanting to bring politics in again. We indeed do it for everyone. Take the Arab countries as an example, we also grant it to all of them, but there are also people who buy, though the list is not very big. We will do even more promotion in those countries. Thank you.
Thank you, Honourable Member. We move to the 3rd question. I now invite Madam Hajah Rodziah binti Ismail, the Honourable Member for Ampang.
Thank you, Deputy Speaker. Question from Ampang number 3.
3. Madam Hajah Rodziah binti Ismail [Ampang] asks the Minister of Health to state the latest status of the implementation of diagnosis-related groups in the private healthcare industry, as well as the regulatory and monitoring measures that will be taken to ensure that insurance/takaful operators do not interfere with the medical decisions of specialists and doctors, and that private hospitals do not make excessive claims.
The Minister of Health is invited to respond.
Thank you, Dato' Deputy Speaker. Thank you, Honourable Member for Ampang. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace, greetings of Malaysia MADANI.
Among the terms that have been heard in this House and also in matters related to health financing reform is "DRG", Dato' Deputy Speaker, which means diagnosis-related group, or in simple language, its translation is a group related to diagnosis, which is a classification that standardises medical cases and hospital cases based on three important components, three main components. The first is the diagnosis of a disease. The second is the treatment procedure, surgical or medical. And the third is what is called the level of severity or severity of illnesses, with your permission. With that, we will have a classification that standardises the aspects of diagnosis, procedure and also its level of severity. For example, appendicitis, for instance. Childbirth, for instance, asthma. It has a level of severity and what procedure is related to it, which at the same time will determine the standardisation of cost or payment or, with your permission, its remuneration. For the information of all, especially the Honourable Member for Ampang, the use of DRG in the private health sector is part of a new initiative. This is the government's initiative and also a cross-ministry initiative, yes, cross-ministry which is whole of nation, yes, whole of not only government, whole of nation, involving the Ministry of Finance (MOF), Bank Negara Malaysia, MOH, the Ministry of Health (KKM) and also others, ITOs and so on, Dato' Deputy Speaker, yes. In other words, we have established a Ministerial-Level Joint Committee on Private Healthcare Costs (JBMKKS), which is also a new term that we are starting to hear in the country, in this House. DRG, once again, is, as I mentioned, a payment mechanism based on data. So, data is very important. What does that mean? Data at this stage, the implementation focuses on the collection of clinical and financial data to develop an algorithm or the logic of DRG, and to set what is the range of treatment for each of the medical cases in hospitals, yes. At present, the implementation of DRG is at the data collection stage, yes, where this data set is to develop the algorithm of the DRG system, and also includes training and capacity building for private hospitals to ensure their readiness to operate and implement this programme,
This DRG, Dato' Deputy Speaker, yes. So, for now, emphasis is given to the standardisation of clinical and financial data as the basis for the implementation of this DRG.
So far, Dato' Deputy Speaker, 80 hospitals out of 104 hospitals that have registered for training have participated in training, through roughly 23 training sessions that we, the MOH, organised, especially with PH Corp. Yes. These developments have shown a good level of acceptance and commitment, very good buy-in, with permission, from private hospitals towards the implementation of DRG. For example, if we noticed, if we walk in front of IJN now, there is that billboard, IJN is moving towards DRG implementation which will provide transparency and accountability in terms of charging costs for procedures at hospitals—at IJN in particular. Dato' Deputy Speaker, DRG is expected to become a catalyst for the transition of the healthcare system— towards healthcare that is more based on outcomes, health outcomes or based on value. This is my— value-based health care system that we have implemented in terms of reform in health care delivery and the system, Dato' Deputy Speaker, yes. So, with that, I also mention— a question that shifts slightly, related to— matters related to the interference of insurance takaful operators, the second aspect of that question, and also TPAs or third party administrators: third party administrator, Dato' Deputy Speaker. In managing this matter, the Ministry of Health (KKM) takes this matter seriously. So, to address this matter fairly, KKM affirms that any action that may threaten, yes, endanger the freedom of medical practitioners to carry out their responsibilities in treating patients may be interpreted as inconsistent with the existing legal provisions in Act 586, the Private Healthcare Facilities and Services Act [Act 856], Dato' Deputy Speaker. In any case, if I may mention a little more, what we have set up or KKM has played an active role in the so-called Grievance Mechanism Committee, yes, a committee to arbitrate this matter, to address this matter. The Grievance Mechanism Committee is a platform that is also joined by Bank Negara (BNM), MMA: Malaysian Medical Association (Persatuan Perubatan Malaysia), an association of hospitals such as APHM or medical or Private Hospital Association (APHM)
yes: the Association of Private Hospital Malaysia and associations of insurance companies and takaful operators which is ITO, Dato' Deputy Speaker. A little more. And also TPAs to discuss and find thorough solutions for the core issues raised and the main issues raised together with the stakeholders or the other stakeholders, with permission, Dato' Deputy Speaker. That is the answer for the two aspects of the one question.
Honourable Member for Ampang, supplementary question.
Thank you, Honourable Minister. The answer is really long. However, I have two more supplementary questions. First, the Honourable Minister may be able to clarify under which provision of law the implementation of this DRG actually is, in the... [Inaudible] I see that DRG in this private sector is implemented either under Act 586, namely the Private Healthcare Facilities and Services Act 1998. If it is indeed under this regulation, I hope it can be clarified, and if DRG is implemented without a special provision in the law, how exactly does KKM ensure that the clinical decisions of medical specialists are not subject to third-party cost assessment in particular. That is the first. Second, considering, Mr Speaker, that insurance and takaful operations are under different regulation between Bank Negara Malaysia and KKM in the context of this DRG, I request that the Minister explain the mechanism and method of coordination and resolution in all aspects relating to between KKM and BNM. Because she requests that they do not conflict between the two regulations or legal provisions that exist. That is all. Thank you.
Please, Honourable Minister.
Thank you, Honourable Member for Ampang, who is very sensitive to this matter, yes. This is not the first time she has raised this matter, Dato' Deputy Speaker. I state clearly, honestly, yes, there is no special provision, yes, in the provisions of Act 586, yes, the Private Healthcare Facilities and Services Act, where there is no provision in it concerning, which
related to the implementation of DRG in the private healthcare sector, Ampang. Regardless, the collection from the angle of our right to collect data, Mr Speaker, to build one— to develop the algorithm I mentioned earlier so that we have one standard, one range of what is important to us, is that DRG information collection at this time is done through a circular. That is the source of authority. A Director-General of Health Circular following several engagement sessions— many engagement sessions that we held with other stakeholders. So, we implement all of this based on one source of authority: a circular from KP with all stakeholders, including industry players, Mr Speaker. And, once information or data on DRG has been collected and analysed by the Ministry of Health Malaysia (KKM), the direction for implementing DRG will be determined. Based on those findings, when we develop the algorithm and logic, there is a possibility of them, and including the possibility— perhaps there is also a possibility of drafting new legislation relating to the transformation of health system financing. As for the conflict mentioned earlier, that is why we have built, developed what is called a joint committee, JBMKKS: the Joint Committee of Ministers on Private Healthcare Costs (JBMKKS), Mr Speaker, which is where it belongs, not only these two Ministers, but together with Bank Negara, together with a... as a team, a consultative body consisting of academics, experts or figures and also industry players...
Honourable Minister, please keep your answer brief.
Thank you, Mr Speaker. [Laughter]
The floor is yours, Honourable Member.
Thank you, Mr Speaker.
Kuala Langat.
What steps will be taken to ensure that the implementation of this DRG does not lead private hospitals to cherry picking, or only selecting simple cases merely to maintain profit margins, and ultimately perhaps causing public hospitals to be overburdened? And how does this DRG system ... address complex cases or unforeseen complications, and this high cost may ultimately be borne by patients and— which may not be covered by insurance? Thank you.
Thank you, my friend Kuala Langat. It is important for us to understand that payment, or remuneration, the wage we pay to the party providing the service, is linked to what I mentioned earlier: the diagnosis classification type. Second, is what procedure must be performed, whether surgical, medical and so on, and third is, determining the level— here is the important part, determining the level of severity, or severity of illnesses, which may include matters related to the patient's comorbidities. If it is an appendix, but there are other complications, if she is giving birth, but there is a caesarean, caesarean section and procedures, then it is not the same. So, to say there is a perception that private hospitals will only carry out simple activities or procedures, that is not so. Simple procedures are paid at a simple procedure level, but complicated procedures are paid, their incentive is paid according to the level of complexity of the case, meaning the level of complexity of the cases. That is why it is important to understand. The perception previously, Mr Speaker, as Kuala Langat mentioned, was that the private sector would only carry out simple procedures. Simple procedures are paid at a simple price, but complex procedures— by building capacity, building what is called clinical, skill and equipment, all of that becomes an incentive for implementation, becomes an incentive to carry out complex procedures. So, because complex procedures are paid at a much higher price than simple procedures. So, there is no contradiction there, Mr Speaker. It is something very logical. That is why we must develop that logical algorithm. So that, based on data from all private hospitals, we determine what the ranges of disease classification, procedures and
severity are. There, Mr Speaker, we hope we will be able to practise what is termed, what I consider important, a value-based health care system, with permission, modernising the health system and the delivery of health services. Thank you, Mr Speaker. Thank you, Kuala Langat. Thank you, Honourable Minister. We move on to question number 4. I invite Tuan Zahari bin Kechik, the Honourable Member for Jeli, to ask his question.
Thank you, Mr Speaker. From Jeli heading to Pontian, Many roads need to be maintained; Number four is Jeli's question, Please ask the Minister to reply promptly.
4. Tuan Zahari bin Kechik [Jeli] asks the Minister of Works to state the total amount allocated and actually spent for road maintenance in each state in 2024, and the amount allocated for road maintenance for 2025.
The floor is yours, Minister of Works.
Going to buy ketupat leaves, Cooking a little to sell; Jeli's question number four, Concerns the road maintenance budget. For the information of Honourable Members, Mr Speaker, the Ministry of Works, through the Public Works Department Malaysia (JKR), JKR Sabah and JKR Sarawak, is responsible for maintaining Federal Roads with a total length of 18,705.93 kilometres, namely 14,973.93 kilometres in Peninsular Malaysia, 1,536.949 kilometres in Sabah, 2,055.92 kilometres in Sarawak and 139.13 kilometres in the Federal Territory of Labuan. The Federal Road Maintenance Privatisation Agreement contracts are categorised into three, namely first, scheduled routine maintenance, second, periodic maintenance, and third, emergency minor works maintenance, which are carried out by the appointed Federal Road maintenance concession companies. Meanwhile, maintenance works for street lights and traffic lights are carried out by JKR through the procurement method.
In 2024, the Ministry of Works allocated a total of RM2.48 billion for routine maintenance, periodic pavement, periodic non-pavement, minor bridge maintenance, street light maintenance and traffic light maintenance carried out by concession companies through Work Orders. In 2025, the Ministry of Works was allocated a total of RM2.96 billion, an increase of RM490 million for the maintenance I mentioned. The breakdown of allocations by state is as follows: |No.| State |Maintenance Cost (RM million)| |---:|--------------------------|----------------------------| | 1|Selangor | 247.15| | 2|Pahang | 428.85| | 3|Terengganu | 166.40| | 4|Kelantan | 173| | 5|Perak | 336| | 6|Pulau Pinang | 50.30| | 7|Kedah | 236.20| | 8|Perlis | 43.40| | 9|Negeri Sembilan | 192.80| | 10|Melaka | 61.80| | 11|Johor | 404.40| | |Total (Peninsular Malaysia) |RM2.36 billion | | 12|Sarawak | 213.20| | 13|Sabah | 341.70| | 14|Federal Territory of Labuan| 40.62| | |Total (East Malaysia) |RM595.592 | | |Overall Total |RM2.956 billion |<END_TABLE_MARKER> Thank you.
Thank you, Honourable Minister. Honourable Member for Jeli, your supplementary question.
Mr Speaker, before I put forward this supplementary question, allow me to thank the Honourable Minister who announced that the government has approved an allocation of RM98 million to upgrade the East–West Highway FT4, 46 kilometres long, in Jeli District. My question, my supplementary questions, are two. The first is what the ministry's or department's standard is in maintaining or carrying out repair works on road damage, especially potholed roads. Because we find that in many places along this FT route, this Federal Route, roads
become potholed and then are patched. After that, when damage occurs, not long after, they are patched again. So, this patching process happens all the time and the problem is never fully resolved. That is the first. The second is that I would like to know the status of the 29 Federal Roads in Kelantan that have been identified, which were announced as identified for maintenance and urgent upgrading. For example, if in Jeli there are four routes, what I especially want to know is FT199. That is all, thank you, Mr Speaker.
The floor is yours, Honourable Minister of Works.
We maintain these roads. I mentioned earlier that there are three methods. Routine maintenance, which is preventive maintenance. The second is periodic pavement maintenance and non-pavement maintenance, which is corrective maintenance. And the third, emergency maintenance. This is if there are floods and so on.
[Bangun]
[Bangun]
[Bangun]
And for that standard method, we look at the level of damage, the type of damage, the category of the road, whether it is a protocol route, main route, secondary route and so on, and traffic volume. Potholed roads must be patched; Federal Roads must be patched in 24 hours or less, at the latest. And the Honourable Member for Jeli mentioned 29 roads. We have 25 locations for 2026 periodic pavement in Kelantan, RM40.9 million. Periodic non-pavement at 25 locations, RM14.5 million. The total for Kelantan in 2026 for maintenance is RM55.4 million. In Jeli District, there are two periodic pavement locations, RM4 million, three non-pavement locations, RM662,000. The total for Jeli alone is RM4.66 million. Thank you.
The floor is yours, Honourable Member for Kinabatangan.
Thank you, Honourable Speaker. My question is whether there is a difference in the type of Federal Road maintenance between Peninsular Malaysia and Sabah, because the difference is very striking, Honourable Deputy Minister. The roads in Sabah, their condition is
extremely bad. As people say, it is like walking on the moon. Cars break down every day. So, I appeal to the Deputy Minister. Thank you.
Honourable Minister.
Thank you, Kinabatangan. I have been to most places in Sabah. From May last year until November, roughly six months, I explored all 25 parliamentary constituencies in Sabah and learnt what the Honourable Member for Kinabatangan mentioned. And I was also in Kinabatangan and saw roads that have not yet been surfaced. For Sabah, Kinabatangan, apart from Perak with RM336 million in 2025, the first place after Johor, Johor with RM424 million, Kinabatangan for Sabah has RM341.7 million for road maintenance in 2025. So, we know these roads include various types of roads: those maintained by JKR Pusat are Federal Roads and also highways. State roads, that is the length of state roads, as well as town roads, are under state governments. State governments receive allocations from the MARRIS allocation of the Ministry of Finance. That is another allocation. The allocation for the Federal Roads I mentioned, their maintenance, but the allocation for state roads, park roads and town roads is under the Constitution allocated by the Federal Government to the respective state governments. That is under the MARRIS allocation of the Ministry of Finance, and if there are still roads with severe potholes, the state government is also responsible for maintaining them, apart from agricultural roads under the Ministry of Agriculture, and village roads under the Ministry of Rural and Regional Development (KKDW). So, these are the main players in ensuring that roads in Peninsular Malaysia, Sabah and Sarawak are maintained properly. Thank you.
[Bangun]
We move on to the next question. The Honourable Member for Langkawi may sit down. I invite Puan Wong Shu Qi, the Honourable Member for Kluang.
Thank you, Deputy Speaker. My question is number 5.
The Minister of Investment, Trade and Industry is invited to reply.
5. Puan Wong Shu Qi [Kluang] asks the Minister of Investment, Trade and Industry to state the short-term, medium-term and long-term measures planned by the government to increase the use of local products: local content in all foreign direct investment (FDI) and domestic direct investment (DDI).
Thank you, Dato' Speaker, Deputy Speaker. First, I thank the Honourable Member for Kluang, as my friend asked a question to MITI. The MADANI Government, through MITI and the Malaysian Investment Development Authority (MIDA), places particular emphasis on increasing the use of local products or local content in FI, namely foreign investment, and DI or domestic investment, as a key strategy to maximise economic spillovers, strengthen local industrial capacity and enhance supply chain resilience. This approach is implemented through strategic collaboration between foreign investors and local companies to encourage the sourcing of raw materials, machinery, components and services from domestic producers, thereby supporting the development of local vendors, expanding import substitution activities and increasing the participation of small and medium enterprises in the global value chain.
In this effort, the integrated approach implemented covers various aspects such as policy interventions, investment promotion mechanisms and the development of an industrial ecosystem to ensure that approved investments truly generate higher multiplier effects for the local economy. To achieve this objective, the government has drawn up and implemented the following short-term, medium-term and long-term measures. First, the government continues to focus on implementing a paradigm shift that is not centred on the concept of Made in Malaysia, but places more emphasis on the new paradigm, namely Made by Malaysia. From MITI's perspective, this effort also focuses on the aspiration to develop an investment ecosystem and create local champions or local champions. Second, setting certain conditions to ensure economic spillovers from high-potential foreign investment projects, including the condition to collaborate with local vendor service companies,
implement local vendor development programmes, carry out industrial training programmes and forge collaboration with local universities or local research institutions. Third, strengthening the supply chain ecosystem between local companies and multinational companies and large local companies, among others through the organisation of supply chain seminars. This effort can also benefit local companies, particularly SMEs, through continuous business and supply opportunities from the investment projects of multinational companies and large domestic companies. Fourth, introducing supply chain resilience incentives. Through Budget 2025, in an effort to strengthen supply chains in Malaysia, this incentive aims to encourage multinational companies and large local companies to expand local vendor development, fill gaps in the industrial ecosystem by producing more global players among local companies. Fifth, as a long-term measure, the government has introduced a new incentive framework, the new incentive framework or NIF. This NIF aims to improve the existing investment incentive offering mechanism by focusing on high-value activities and contributing to economic spillover effects. The NIF will also provide better incentives for projects that use more local vendors and train more local workers. In line with pillar three of the National Investment Aspiration or National Investment Aspiration, namely expanding domestic linkages, that is, extend domestic linkages. The NIF pilot phase was carried out until the end of 2025 and will be fully implemented from the beginning of the first quarter of 2026 for the manufacturing sector, followed by the services sector in the second quarter. Overall, the government is committed to ensuring that increasing the use of local products remains a core pillar in the country's investment strategy to maximise economic spillovers to domestic industry. This effort is in line with the MADANI Economic Aspiration and the New Industrial Master Plan in ensuring that investment received not only increases the nation's economy, but also directly contributes to the development of local industry and the well-being of the rakyat. Thank you.
The floor is yours, Honourable Member— supplementary question from the Honourable Member for Kluang.
Thank you. Thank you for the lengthy answer from the Deputy Minister, but for me the most important thing is how we achieve our objective, namely increasing the use of local content, with permission, in all products we make in Malaysia. So the most important thing I want to know is how the government measures the actual level of local content use in investment projects, whether FDI or DDI. Are indicators or KPIs specifically set to ensure this commitment. That was a lot of commitments to strengthen the ecosystem and so on. How do we ensure that all these commitments are not merely declarative, with permission, meaning lip service only, but are truly implemented and monitored by the government. Thank you.
The floor is yours, Honourable Minister.
Thank you, Deputy Speaker. Thank you to Kluang for this good question. Because in the past we indeed lacked measurement, and usually reporting was merely observed. It was just reported and accepted as such. So, under the new NIF framework, the government has placed emphasis on outcome-based measurement and monitoring to ensure that the commitment to using local content in investment projects is not merely declarative, but translated into real impact on the domestic economy. Among the measurements and monitoring implemented are the local content measurement framework. Local content measurement is carried out using a combination of quantitative and qualitative indicators, among them: (i) the percentage of local sourcing for raw materials, machinery components and services; (ii) the level of participation of local companies and small and medium enterprises in the supply chain; (iii) the percentage of local manpower, including skill levels and training; and (iv) the progress of implementation of vendor development programmes and knowledge transfer.
These indicators are assessed by reporting scale sector and industry maturity level to ensure a realistic and pragmatic assessment. We also have two stages of assessment: one is pre-approval, and the other is post-approval. Post-approval means that the reporting is monitored through reporting to assess the level of compliance and progress, including through continuous engagement sessions with reporting companies and local vendors. So, to answer the question from the Honourable Member for Kluang, the new policy is tighter, more systematic and more careful, and ensures that local companies and the local industry benefit. Thank you, Dato' Deputy Speaker.
The Honourable Member for Kubang Pasu, please.
Thank you, Dato' Mr Speaker. I wish to ask about the National Semiconductor Strategy to my old friend, as we were together in the PAC before. Deputy Minister, the NSS, which was launched in May 2024, aims to upgrade the value chain from backend to frontend. As the Minister said earlier, we want to change from the situation of Made in Malaysia to Made by Malaysia. I would like to ask what— firstly, what progress has been achieved in efforts to upgrade the value chain from backend, namely testing and packaging, to frontend, namely integrated circuit design, advanced packaging and advanced equipment technology. Also, what progress has been achieved in training and upskilling 60,000 engineers in the semiconductor field by 2030? Thank you. Thank you, Deputy Mr Speaker.
The Honourable Minister, please.
Thank you, Dato' Deputy Speaker. Thank you to the Honourable Member for Kubang Pasu. The Honourable Member for Kubang Pasu is a comrade in the PAC. The Honourable Member for Kluang is also my former PAC comrade. I thank the Honourable Member for Kubang Pasu for the question on the NSS. In fact, the government is currently implementing the NSS, and we have targets, as the Honourable Member for Kubang Pasu said, of 60,000 skilled workers in semiconductors. In fact, we also want to champion 10 companies with a turnover of USD1 billion— large companies— and 100 companies with RM1 billion, so that a strategy of large companies bringing along small companies and SMEs is used, and to create that kind of 60,000 skilled workers who can make the NSS a success.
This is the government's strategy, namely the National Semiconductor Strategy. However, this effort has only just begun. It is not— it is ongoing, yes. So I do not have a full breakdown of how many have been trained. If possible, I will later ask for a written reply on how many have been— that we have implemented at this time, because this question is not related to local content, but I can provide a written reply. Thank you, Kubang Pasu.
Alright, thank you. The House now moves to Question No. 6. I now invite Tuan Haji Ahmad Johnny bin Zawawi, the Honourable Member for Igan.
Thank you, Dato' Mr Speaker. Igan's Question No. 6.
6. Tuan Haji Ahmad Johnie bin Zawawi [Igan] asks the Minister of Rural and Regional Development to state the concrete steps the ministry is taking to empower rural youth in Sarawak, including in the Igan Parliamentary constituency, through skills training, entrepreneurship and modern agriculture programmes to improve their employment opportunities and income.
The Minister of Rural and Regional Development is invited to reply.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah.
Waalaikumussalam.
Thank you, Dato Mr Speaker. Thank you to the Honourable Member for Igan for the question. Dato' Mr Speaker, the Ministry of Rural and Regional Development (KKDW) consistently places very serious emphasis on the rural youth development agenda, in line with the aspirations of the Rural Development Policy. The ministry strongly encourages youth involvement in entrepreneurship, provided mainly through agencies under KKDW, to provide business training and guidance, financing schemes and also market access. For example, through the implementation of programmes such as Start Right 2.0 Programme, to help target groups through early exposure to becoming entrepreneurs and subsequently to provide opportunities for skilled rural youth to venture into the world of entrepreneurship.
Apart from that, the empowerment of technical and vocational education and training under KKDW agencies will continue to be implemented so that it can meet industry needs. Under the ministry, there are a total of 281 TVET institutions offering 580 programmes covering 15 skills clusters, with graduate employability reaching 95 per cent over the past two years. Sarawak currently has 31 GIATMARA Centres which have produced 26,000 students, while there are two MARA Skills Institutes (IKM) in Sarawak which have contributed 29,000 graduates. Overall, these two institutions have produced 55,000 skilled graduates who are the main backbone of Sarawak's youth in strengthening their technical skills. Efforts to help youth are also supported through various collective economic programmes such as the implementation of the Integrated Village Economic Development Project (PROSPEK), which involves five or more existing villages to develop niche products and create economies of scale. A total of five PROSPEK projects have been held in Sarawak, namely PROSPEK Matu, PROSPEK Lawas, PROSPEK Kota Samarahan, PROSPEK Betong and PROSPEK Sebuyau, involving 25 villages. Apart from that, there are programmes for public welfare such as the Income Enhancement Programme to provide guidance to target groups to carry out economic activities, and the Skills and Career Training Programme to increase skills training and rural employment opportunities, including for youth. A total of 111 participants have benefited from the Income Enhancement Programme project, and 107 participants have benefited from PLKK in Sarawak through four skills courses implemented last year. Thank you, Dato' Mr Speaker.
The Honourable Member for Igan, supplementary question, please.
Thank you, Dato' Mr Speaker. Before I put my supplementary question, on behalf of my fellow Member of Parliament from Hulu Selangor, I wish to welcome the visiting group of students from Management and Science University (MSU) to Parliament. Welcome to Parliament. [Applause] Thank you, Honourable Deputy Minister, for the very detailed answer you have given. My supplementary question, Honourable Member,
how does the ministry measure the effectiveness or outcomes of programmes to empower rural youth in Sarawak after they complete training or programmes, in terms of increased income, employment opportunities and project sustainability? Does the ministry have monitoring in place to ensure that youth who complete training actually obtain employment or are able to generate their own income? As an example, the Integrated Village Economic Development Project (PROSPEK) in the Matu district in my Parliamentary constituency, Dato' Mr Speaker, under the Honourable Minister's ministry, such as the Fibre Processing Centre, the Jellyfish Processing Centre and the Ice House Project in Kuala Matu, and the Handicraft Production and Collection Centre in Kampung Treng Matu. What is the status of these projects? And have these projects succeeded in increasing their income? And does the ministry monitor the development of these projects so that these people become more advanced in terms of their economic status? Thank you, Dato Mr Speaker. Thank you, Honourable Deputy Minister.
Silakan Menteri.
Thank you, Honourable Member for Igan, for the supplementary question. For the information of the Honourable Member, every programme implemented by KKDW, including its agencies, has a systematic and holistic approach or method in measuring the success of empowerment programmes, especially those involving rural youth in Sarawak. This measurement does not only focus on training output, but also covers long-term impacts, including socio-economic impacts. For example, from the MARA perspective, because the rate or method of measuring these programmes differs according to the agencies under KKDW. Under the ministry, for the PPP: Income Enhancement Programme and the PLKK programme, we measure based on an increase in income of at least 30 per cent after six months of the programme. Meanwhile, under MARA, it uses an approach in terms of generating employment opportunities and also income enhancement opportunities through entrepreneurship programmes. For the information of the Honourable Member, to ensure that youth who have received training obtain employment opportunities, several approaches have been taken. One of the technical training courses we implement at the training centres that we
run, we collaborate with industry. So far, we have 271 collaborations with industry, to ensure employment opportunities especially for students from GIATMARA, IKM and other technical centres. Secondly, in terms of income enhancement through entrepreneurship programmes. After receiving training, we implement financing programmes or periodic monitoring for technical participants and also our economic programmes. We implement monitoring where we still provide guidance, we still provide training, advice and also in the form of financing. Not only— especially under the specific agency MARA, not only in the form of grants, but also in the form of loans. Examples include SEMAi, PUTEK, PUTRA, DanaNITA. These are among the financing schemes. We have more than 20 financing schemes, including entrepreneurship programmes that people call large-scale. Meaning those that have their own brands, automotive, pure and so on. This is the approach used by KKDW to ensure the marketability of participants, especially graduates from our training centres. On the second question, namely the status of the PROSPEK Matu project. For information, PROSPEK Matu began in 2020 with a development cost of RM9 million, where the implementing agency is the Sarawak Land Development Board (LKTS) as the implementing agency of the project, which involves three components: economic, housing and infrastructure, and implementation involving six villages.
For the information of the Honourable Member, the status of this project has reached 52 per cent progress, which now has expenditure of RM3.5 million out of RM6.9 million. This means there is still allocation, Honourable Member, because the monitoring or implementation system is still in process. The projects or programmes mentioned by the Honourable Member just now are still in, as people say, evaluation and also implementation by LKTS, and what we want to ensure is that this programme provides opportunities for income enhancement for participants and at the same time, also creates employment opportunities, especially for residents in rural areas.
LKTS is implementing and completing the remaining projects under the economic component, such as upgrading smokehouses, building new sago processing houses, upgrading sekiu oil processing houses, assistance for participants of the Prospek Entrepreneur Development Programme and so on. This assistance will be distributed in stages and is expected to benefit 169 participants starting March 2026. The ministry and the implementing agency of the project will give full commitment so that the PROSPEK Matu Project can be expedited for the benefit of the community in the district concerned. Thank you, Dato' Mr Speaker.
Please, the Honourable Member for Padang Terap.
Thank you, Dato' Mr Speaker. Honourable Deputy Minister, Padang Terap is the same as the Igan Parliamentary constituency, namely a rural area. An area better known as an agricultural area. So, many youths have the potential for us to help in the agricultural sector, particularly related to modern agriculture. So, my question to the Honourable Deputy Minister is, what is— what is KKW's target for producing young farmer-entrepreneurs who are assisted in modern agriculture? What is the target for each Parliamentary constituency throughout Malaysia, and is there a specific programme to produce young farmer-entrepreneurs through modern agriculture? Thank you.
The Honourable Member, please, to reply.
Okay. Thank you, Padang Terap Member, for the question. For the information of the Honourable Member, from the planning perspective, KKW does not have a specific plan. That is to say, the percentage in terms of development of the area concerned. For the information of the Honourable Member, the planning of any project to an area is based on applications. Applications submitted to the state PKN Office and also, if in Kedah, through KEDA. Yes, through KEDA, and the selection of these projects is based on, as people say, the guidelines that have been set.
For information, KEDA in Kedah has implemented many economic development programmes, especially in agriculture. For example, recently in the Baling area. Padang Terap, I do not have the data here today, Honourable Member. Perhaps I can reply in writing after this, with a fuller explanation. For example in Baling, we carried out a PROSPEK Litigasi project involving several villages and youths, which at this time has already helped increase income and also generated employment opportunities for youths in the area concerned. At the same time, we helped in terms of, as people say, ensuring that food supply for the government or for our country is kept under control. For the information of the Honourable Member too, KKW does have plans to expand the AgroTVET@KKDW Programme. Our target is 500 modern farm entrepreneurs through UCAM, our agricultural university in Melaka. We do have plans. However, as people say, specifically relating to Padang Terap, I do not have the data. God willing, I will reply in writing. Thank you, Honourable Member.
Thank you, Minister in the Ministry of Rural and Regional Development.
[Bangun]
Before I move to Question No. 7, I request that in the Gallery, the Yang Beradat Batin-Batin, the Orang Asli leadership from the Hulu Perak District and the Central Perak District, be recognised. [Applause] Together with officers— please stand. [Applause] The Orang Asli in Perak are divided into two ethnic groups. The Temiar ethnic group. [Speaks in the Orang Asli Perak dialect] Mai Perak. Ha, this is the Semai ethnic group. Please sit down. [Applause] Honourable Members, on this occasion, I am pleased to welcome the visitors from the Yang Beradat Batin-Batin, the Orang Asli leadership from the Hulu Perak District and Central Perak, together with officers of the JAKOA Perak State Office, the Department of Orang Asli Development (JAKOA) Perak State Office, who are in the Public Gallery, including the Special Officer to the Menteri Besar of Perak, our friend Mr Chew Beng Ho @Angah. Welcome to the Parliament of Malaysia. I hope today's visit provides benefit and a deeper understanding of the proceedings of the House.
For the information of the Orang Asli in the House, the next question, which will be answered by the Minister of Home Affairs, relates to the Orang Asli, yes. So, the Orang Asli in the Public Gallery, this is what happens in the House. Next, I move to Question No. 7. I invite Tuan Mohd Nazri bin Abu Hassan, the Honourable Member for Merbok.
Thank you, Deputy Mr Speaker. My question also concerns them. Welcome. Thank you. My question is Question No. 7.
Honourable Member for Merbok, I permit you to read out the question.
Read the question? Thank you, Tuan Mr Speaker. [Applause] My question, which reads, asks the Minister of Home Affairs to state how the ministry will ensure that senior citizens, persons with disabilities, rural residents and Orang Asli are not marginalised if security and immigration services begin to depend fully on MyDigital ID. I request the Minister. [Applause]
7. Tuan Mohd Nazri bin Abu Hassan [Merbok] asks the Minister of Home Affairs to state how the ministry will ensure that senior citizens, persons with disabilities, rural residents and Orang Asli are not marginalised if security and immigration services begin to depend fully on MyDigital ID.
The Minister of Home Affairs is invited to reply.
Thank you, Honourable Dato' Dr., some people from my constituency are also present, Honourable Member. I have many strong supporters there. Very clearly— whatever policies and programmes the government implements, the interests and future of the Orang Asli community are preserved and protected. Dato' Mr Speaker, MyDigital ID is the national digital identity that enables citizens' identities to be verified securely to access online government services. It functions as a single sign-on mechanism and complements the use of MyKad in the digital environment.
Implementation is carried out in stages, Honourable Member, and has been or is being used by several ministries and agencies such as JPJ, KWSP, PERKESO, KKM and selected enforcement agencies. For the Royal Malaysia Police (PDRM), the MyBayar PDRM application is a PDRM online application that was fully integrated with MyDigital ID on 1 October 2025. This application enables members of the public to check and pay traffic summonses online. In addition, this platform also provides facilities to obtain certain documents such as copies of accident reports without us having to come to the Police Station Counter. MyBayar PDRM can be accessed either through the mobile application or the PDRM website itself, Honourable Member. For information, for the year 2026, PDRM has strengthened initiatives to ensure that senior citizens, persons with disabilities, and rural residents who have limited internet access or digital skills can pay summonses easily through alternative channels. Among them, by maintaining physical payment counters at district police headquarters, JSPT counters and Pos Malaysia post office counters throughout the country, to assist those who do not have internet access or digital skills, including in areas of Orang Asli communities.
Dan tentunya bagi penduduk luar bandar yang kurang capaian peranti, kewujudan pusat NADI, yakni pusat ekonomi digital di bawah Malaysian Communications and Multimedia Commission, juga membantu komuniti luar bandar untuk mengakses perkhidmatan kerajaan melalui talian, termasuk bayaran saman dengan menyediakan capaian Internet, latihan literasi digital secara khidmat mudah, pemudah cara kepada komuniti. Untuk makluman, PDRM dan juga Immigration turut meningkatkan latihan kemahiran di kaunter untuk membimbing warga emas, OKU termasuklah masyarakat Orang Asli yang hadir termasuk membantu mereka dalam proses pendaftaran MyDigital ID jika perlu bagi kegunaan masa depan. Terima kasih.
Baik Yang Berhormat, soalan tambahan.
Terima kasih Timbalan Menteri.
Soalan tambahan saya, adakah jaminan Kementerian Dalam Negeri bahawa warga emas, OKU, penduduk luar bandar dan Orang Asli ini tidak akan dinafikan hak pergerakan keselamatan atau urusan imigresen sekiranya mereka gagal mengakses atau menggunakan MyDigital ID? Apakah kaedah alternatif bukan digital akan disediakan? Dan, bilakah garis masa sasaran KDN untuk bergantung sepenuhnya kepada MyDigital ID dalam perkhidmatan keselamatan dan imigresen? Dan adakah pelaksanaan ini akan ditangguhkan sekiranya isu akses latihan dan prasarana masih belum diselesaikan? Sekian, terima kasih.
Silakan Yang Berhormat Menteri.
The Honourable Member, my friend from Merbok...
[Bangun]
I am pleased to state that the Government emphasises that the implementation of MyDigital ID will not be made the sole method of identity verification for security and immigration matters. MyDigital ID is the Government's alternative for a secure and trusted digital identity solution and does not replace MyKad. That is what I need to emphasise. And the Government gives assurance that senior citizens, persons with disabilities, rural residents and the Orang Asli community will not be marginalised or denied services due to limitations of digital devices, internet access or digital capability itself. And in line with that, if I may mention the PDRM, it will continue to accept alternative identity verification methods for these groups, including the use of MyKad and physical identity documents and manual document verification, as we commonly do. In addition, Honourable Member, face-to-face verification at the service counters of the district police headquarters and at post offices is also implemented with the help of our trained officers there. This means that for those who are unable, if this is not available, they can still use the usual methods. But we are constantly improving the capability of our officers.
[Bangun]
And certainly the Government, KDN, is committed to ensuring that MyDigital ID is implemented in phases, in line
with the Government's responsibility to protect the safety of the people without neglecting rights and welfare. We know and understand that the capabilities of the people vary. Certainly, we also diversify our approaches. What we do, the important thing is that security matters remain our priority. Thank you, Dato' Speaker.
Thank you, Honourable Minister. Next, I invite the Honourable Member for Kuala Pilah.
Thank you, Honourable Dato' Dr. Deputy Speaker. Thank you, Honourable Deputy Minister, for the clear reply. My supplementary question is how the Government ensures that this MyDigital ID data is used securely and that PDRM officers have clear accountability so that there is no misuse against vulnerable groups? Thank you.
Please, Honourable Deputy Minister of KDN, to respond.
Honourable Member, for the information of the House, we wish to emphasise that MyDigital ID data is managed according to the prescribed cybersecurity standards and complies with the Personal Data Protection Act 2010, Honourable Member. This means that the implementation of MyDigital ID is carried out with principles that certainly emphasise security, privacy and the protection of the people's rights as a priority. This is very important. For every Malaysian citizen, their data is highly protected. These aspects are given attention. So, to ensure there is no misuse of data, especially against vulnerable groups, for example senior citizens, persons with disabilities, rural residents, including our Orang Asli community friends, please inform the people under your respective care that we pay close attention to the matter of their data. The people's data, including the data of the Orang Asli community, we protect all of it. And I also want to mention that the Government has done and will carry out, among other things, the measures where our officers at PDRM level are given continuous training, Honourable Member, on handling sensitive data, matters related to cybersecurity, ethics of data use, and protection for vulnerable groups. We ensure this training is provided so that our officers truly understand their responsibilities and the application
of the law if misuse occurs. This means our officers are made to understand that if an offence occurs, what consequences they will face. And to control the security of access to MyDigital data, Honourable Member, through secure systems including the use of secure password and officer authentication, activity logs and so on, only officers who are officially authorised and have undergone specific training are empowered to access sensitive information. Therefore, I want to say that the people out there, whoever they are, including the Orang Asli, do not need to worry, as the security of our data is guaranteed by the Government. Thank you.
Thank you, Honourable Minister. For the information of the Orang Asli in the gallery who come from Hulu Perak, the Honourable Deputy Minister is the Member of Parliament for Lenggong. If you are from that area, this is your Member of Parliament. Alright, the House moves to the eighth question. The House now invites Puan Syerleena binti Abdul Rashid, the Honourable Member for Bukit Bendera.
Thank you, Dato' Speaker. My question is number 8.
8. Puan Syerleena binti Abdul Rashid [Bukit Bendera] asks the Minister of Housing and Local Government to state, to ensure that housing projects under the supervision of the Ministry of Housing and Local Government (KPKT) are implemented more efficiently, whether the Government intends to introduce or use artificial intelligence (AI)-based monitoring technology in the process of planning, managing and monitoring these projects.
The Minister of Housing and Local Government is invited to respond.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Allahumma salli ala Sayyidina Muhammad wa ala Sayyidina Muhammad. Mr Speaker, for the information of Mr Speaker and the Honourable Members, in line with the National Housing Policy framework and the aspirations of the MADANI Government which emphasises the principle of Leave No One Behind, the Government is committed to ensuring the provision of housing that is inclusive, quality and affordable through an integrated approach that covers aspects of planning,
financing, implementation and also monitoring. This approach aims to ensure access to housing as a basic need, whether through ownership or rental, in line with the concept of Shelter for All. The Government is aware that the main challenges in the housing sector include alignment — misalignment of planning, project management efficiency, and limited integrated data for monitoring and reporting purposes. In this regard, Honourable Members, the Housing Integrated Management System (HIMS) has been developed as one integrated platform (single platform entry) for the management of housing developments in accordance with the provisions under the Housing Development (Control and Licensing) Act [Act 118]. Mr Speaker, the implementation of HIMS enables full processing to be carried out online for housing development licence applications as well as advertising and sales permits, thereby simultaneously improving administrative efficiency, regulatory transparency and the effectiveness of housing development monitoring. Under the Thirteenth Malaysia Plan, Honourable Members, housing reform is outlined as one of the structural reform agendas aimed at strengthening the national housing ecosystem through improving quality, the delivery of housing asset management, and the effectiveness of government intervention. And this reform is implemented through strategies that cover the development of affordable housing oriented towards the needs of the people. Second, the strengthening of the public housing maintenance programme. Third, the provision of more targeted mechanisms, financing and incentives. Mr Speaker, the Government has taken note of the proposal put forward by the Honourable Member concerning the use of artificial intelligence technology in the housing sector to further enhance efficiency in project planning, management, monitoring and quality control.
However, the application of this technology must be implemented with great caution and by considering the capabilities of all our strategic partners involved in the housing sector. In this context, Mr Speaker, the Government will continue to expand the use of technology and modern construction, such as building information
modelling (BIMS) and also IBS to improve productivity, quality and cost efficiency. In line with technological advancement, Mr Speaker, the Government, through various agencies, will also continue to explore the use of new technologies including AI in construction methods such as prefabricated constructions as part of our efforts to improve project implementation efficiency, ensure compliance with implementation timelines, and maintain construction quality standards, especially for the construction of affordable housing. Mr Speaker, thank you.
Alright, the Honourable Member for Bukit Bendera. Please proceed with your supplementary question.
Thank you, Dato' Speaker. But before that, allow me to welcome the ladies of Bandar Tun Razak from the Bandar Tun Razak Parliamentary constituency. So, thank you to the Honourable Deputy Minister for the answer provided. So, my supplementary question is at what stage this AI technology will be used, whether at the initial planning stage or monitoring, physical progress, cost control projects, or early verification of delays and construction defects, and pilot projects. So, what has been or is being implemented by KPKT so far? And at the same time, how can the ministry ensure that the data and findings from this AI system are translated into clear corrective action? This includes action against contractors or developers who fail to comply with specifications or schedules and safety standards. And lastly, what information will be opened to public audit or Parliament? Thank you.
Please, Minister, to respond.
Mr Speaker, for the information of Mr Speaker and the Honourable Members, the ministry has taken steps in the use of AI in an integrated manner through the development of the Malaysia Urban Observatory Analytic Centre, which is an evidence-based planning and data-driven monitoring platform to integrate various big data platforms to formulate accurate solutions as mentioned by the Honourable
Member just now. Quick and comprehensive in planning urban developments and subsequently housing. This will also monitor the level of well-being and sustainability of our cities and also including housing through social, economic and environmental aspects. At the same time, Mr Speaker, I would like to say this. For the use of AI at the national level, Mr Speaker, we are at a developing stage, Honourable Members. Some other foreign countries have already reached a high level. On a large scale. But at the national level we are developing. We started in 2020 where we focused on big data and also for housing planning and building information modelling for digital approval. And at the same time, Mr Speaker, as asked by the Honourable Member just now, ideally the use of AI technology by KPKT is planned to be implemented in phases. And it involves the entire life cycle of a project, where it is not just one phase, Honourable Members, yes. And at the initial planning stage, AI will be used in the form of predictive analytics to support the assessment of actual housing needs and the matching of demand and supply, as well as project risk analysis based on data, location history and socioeconomic profiles. Meanwhile, the second stage, Mr Speaker, is the implementation stage where the AI we use has the potential to support monitoring of physical progress through the integration of data from project reporting systems, the BIMS I mentioned earlier and site images including drones or closed-circuit cameras, scheduled monitoring to detect early signs of delays, cost risks and non-compliance with specifications. For the information of the Honourable Member also, under the task force on delayed, troubled and abandoned housing projects, as proposed by the Honourable Member, this matter is being worked on so that we can address the issues of delayed, troubled and abandoned housing projects more effectively. Mr Speaker, thank you.
Alright. Before I call the left side, there are no Honourable Members? Alright, one moment, Honourable Member. I request that the Orang Asli in this Chamber please do not leave, yes. After the Prime Minister gives his speech shortly, then
you may leave, as it is a stroke of good luck. The Orang Asli can see our Prime Minister debate. So, please take this space, yes. Please, the Honourable Member for Parit Buntar.
Mr Speaker, do not hang the flag upside down; listen carefully to my question. First, does the ministry plan to collaborate with other parties such as the Ministry of Digital Malaysia or construction agencies to develop AI standards and protocols to ensure that AI-based monitoring systems are safe, efficient and effective, and how will the ministry address the digital skills gap and the cost of AI implementation among small and medium contractors involved in housing projects so that they too can benefit from this technology fairly? Thank you.
Please, Honourable Minister, to respond.
Mr Speaker, indeed at the level of the Ministry of Housing and Local Government, we are working with the Ministry of Digital (KD) to accelerate the adoption of AI, especially at the level of local authorities, through the AI Cities (Bandar AI) initiative. And this enables traffic management, public transport, resource allocation and public management to be driven by intelligent systems based on prediction. And overall, Mr Speaker, the MADANI Government is indeed strengthening the policy framework, implementation mechanisms and monitoring instruments, including those mentioned by the Honourable Member just now, in helping housing development contractors. Thank you, Mr Speaker.
We have reached the last question for Oral Questions. Please, Tuan Haji Bakri bin Jamaluddin, the Honourable Member for Tangga Batu.
Thank you, Mr Speaker. My question is number 9. Thank you.
9. Tuan Haji Bakri bin Jamaluddin [Tangga Batu] asks the Minister of Rural and Regional Development to state whether there are any programmes or assistance schemes in the form of grants, loans or logistics from agencies under the ministry to graduates of TVET programmes to produce TVET entrepreneurs so that they do not depend on salaried employment.
The Minister of Rural and Regional Development is invited to respond.
Thank you, Dato' Speaker. Thank you, the Honourable Member for Tangga Batu, for the question. Dato' Speaker, for the information of the House, the Ministry of Rural and Regional Development (KKDW), together with the agencies and TVET institutions under it, has provided various forms of support assistance to TVET programme graduates to enable them to venture into entrepreneurship and not depend solely on salaried employment. As a foundation, the TVET institutions under KKDW have integrated entrepreneurship elements as a core component in the compulsory curriculum of TVET programmes from the early stages of study. In fact, there is a special specialisation for the Diploma in Techno-entrepreneurship, where so far we have produced 442 graduates, and from 2016 to 2025, sales by TVET students reached RM120 million. Examples include through teaching and learning of specific subjects such as Start-Up Enterprise and Digital Enterprise, where TVET students are guided to make use of the skills learned to generate income through entrepreneurial activities. This approach can foster an entrepreneurial mindset among students and prepare them to build careers as entrepreneurs. Agencies under KKDW also provide other support facilities such as micro financing, equipment purchase, working capital, training, as well as guidance and coaching services to help TVET graduate entrepreneurs develop their businesses. For example, MARA offers several facilities such as financing schemes applied for by TVET programme graduates, among them the MARA Institutes of Education Graduates/Youth Entrepreneur Programme, PUTRA for short, with a maximum financing limit of RM10,000. Second, the IPMa Graduates Financing Scheme, which we call SEMAi, with a maximum limit of up to RM50,000. Third, the Technical Entrepreneur Development Programme, PUTEK for short, with a maximum financing limit of RM500,000, and
the Special Women's Business Financing Scheme (DanaNITA) with a financing limit of up to RM150,000.
Selain daripada itu, menerusi sokongan logistik agensi di bawah Kementerian Kemajuan Desa dan Wilayah (KKDW), pelajar lepasan program TVET juga berpeluang mendapatkan kemudahan premis perniagaan, ruang inkubasi, bengkel serta lot komersial pada kadar sewaan yang berpatutan. Kemudahan ini membolehkan mereka memulakan perniagaan dengan kos yang lebih rendah dan sokongan logistik yang mencukupi sekali gus meningkatkan keyakinan pelajar lepasan program TVET untuk menceburi bidang keusahawanan. Selain pada itu juga, Dato' Mr Speaker, Program Start Right (PSR) juga telah dilaksanakan sejak tahun 2021 oleh KKDW sebagai pemangkin kepada belia termasuk pelajar lepasan TVET untuk menceburi bidang keusahawanan teknikal. Program ini merangkumi latihan keusahawanan, penyediaan set, peralatan, modal pemulaan dan perniagaan bernilai RM20,000. [Mr Speaker presided over the Sitting] Inisiatif ini diperkukuhkan lagi dengan sistem bimbingan dan pemantauan selama tempoh 24 bulan bagi memastikan usahawan baharu berusaha menjana hasil jualan yang mampan dan berdaya saing. Terima kasih Tan Sri Mr Speaker.
Baik, saya jemput Tangga Batu.
Terima kasih Mr Speaker, terima kasih Honourable Member, the Honourable Deputy Minister. Kita maklum bahawa fisioterapi juga sebahagian daripada program TVET. Memandangkan keperluan perkhidmatan fisioterapi semakin meningkat khususnya dalam kalangan warga emas, pesakit strok dan OKU (persons with disabilities) di luar bandar, adakah kementerian bersedia memberikan komitmen khusus untuk mewujudkan skim pembayaran atau geran yang disasarkan kepada penubuhan klinik fisioterapi swasta di kawasan desa? Ataupun apakah kementerian boleh memperuntukkan dana khas bagi menyokong pertumbuhan pusat fisioterapi dan meringankan beban golongan rentan atau B40 bagi menghadapi akses kepada sesi terapi pemulihan kerja di pusat fisioterapi swasta yang berada di luar bandar? Sekian, terima kasih.
Sila, Menteri.
Terima kasih YB Tangga Batu. Berkaitan dengan latihan berkaitan dengan fisioterapi tadi. Untuk makluman, sebenarnya
MARA mempunyai satu program khas pendanaan untuk usahawan-usahawan profesional yang mana salah satunya ialah untuk sektor perubatan yang mana kita dah ada U.n.i KLINIK. U.n.i KLINIK ini dentist, farmasi dan fisioterapi merupakan salah satu cadangan baharu untuk apa orang kata— tajaan ataupun pinjaman sokongan kepada doktor-doktor yang ingin membuka klinik-klinik, bukan saja di bandar malah juga di kawasan luar bandar. Di samping beberapa sektor profesional yang lain berdasarkan skim pembayaran profesional itu tadi. Terima kasih Tuan Yang di-Pertua.
Baik, saya jemput Batang Lupar.
Terima kasih Tan Sri Speaker. Mengenai dengan graduan TVET yang diperkatakan oleh Menteri tadi, saya ingin bertanya berkenaan dengan sokongan dan logistik serta pemasaran graduan-graduan TVET yang lahir contohnya dari GIATMARA, dari UniKL dan sebagainya. Apakah kementerian bercadang untuk mewujudkan hab usahawan TVET di desa, di peringkat daerah yang menyediakan bukan sahaja ruang ataupun coworking space tetapi juga kemudahan logistik seperti pusat pembungkusan dan pemasaran digital secara berpusat bagi membantu usahawan TVET memulakan perniagaan dengan kos overhead yang lebih rendah? Terima kasih.
Sila Menteri.
Terima kasih YB Batang Lupar. Untuk makluman, KKDW mempunyai perancangan ke arah berkenaan. Namun untuk makluman Yang Berhormat, pusat-pusat sokongan di peringkat luar bandar, maksudnya di peringkat Parlimen ataupun peringkat daerah masih agak terhad. Masih agak terhad. Ada, sebab kita ada set inkubator-inkubator kita di peringkat Parlimen dan juga peringkat daerah tetapi terhad. Namun untuk orang kata, fasiliti perkilangan yang lebih kompleks, kita ada di peringkat bahagian dan juga peringkat negeri. Di Sarawak, kita ada di kawasan Demak Laut, kita ada kilang-kilang ataupun kedai-kedai yang diberi kemudahan kepada usahawan-usahawan desa khususnya dalam membangunkan produk dan juga memastikan akses pasaran bagi produk- produk yang mereka lahirkan. Namun inisiatif untuk memperbanyakkan ini, memperbanyakkan hab-hab ataupun premis-premis sokongan ini di peringkat luar bandar sedang kita rancang
dan kita tambahkan lagi. Khasnya premis-premis perniagaanlah ya. Terima kasih, Tuan Yang di-Pertua.
Baik Yang Berhormat, sekarang tamatlah sesi untuk waktu pertanyaan-pertanyaan bagi jawab lisan. Saya difahamkan ada usul, silakan. [Sesi untuk Pertanyaan-pertanyaan bagi Jawab Lisan tamat]
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Tan Sri Mr Speaker, "Under Standing Order 12(1), I respectfully move that the Sitting today shall not be adjourned until the turn of the Ministry of Transport as stated in No. 8 in the order of business for the Honourable Ministers to reply to the debate on the Motion of Thanks on the Royal Address that has been circulated, and after that the Sitting shall be adjourned until 10 a.m. on Thursday, 5 February 2026."
Ada yang menyokong?
Sukacitanya saya mohon menyokong.
Baik. Ahli-ahli Yang Berhormat, sekarang saya kemukakan masalah kepada majlis untuk diputuskan. Masalahnya ialah usul seperti yang dikemukakan tadi hendaklah disetujukan.
[Motion put for decision; and agreed to]
Statement by YAB Prime Minister — Under S.O. 14(1)(i) Boundary Alignment: Outstanding Boundary Problem (OBP) Between Malaysia and Indonesia
Baik. Yang Amat Berhormat Perdana Menteri dipersilakan memberi penerangan mengenai penjajaran sempadan Outstanding Boundary Problem (OBP) di antara Malaysia dan Indonesia. Sebelum Perdana Menteri memberikan penerangan, saya nak maklumkan saya tidak membenarkan pencelahan dan tidak ada soalan-soalan ataupun apa-apa juga dibangkitkan selepas Perdana Menteri bersuara. Silakan.
Tan Sri Speaker, itu keputusan Speaker.
Keputusan saya.
Sebenarnya kalau dibuat pencelahan dan penjelasan lanjut, dia akan memberikan penjelasan dan— kerana ia satu isu yang besar. Takkan tak boleh, Honourable Speaker.
Ini adalah sesi penerangan. Perdana Menteri akan memberi penerangan...
Tapi ada precedent yang Tan Sri juga bagi ruang kepada Ahli Parlimen untuk bertanya.
Ya, jadi bolehlah ditanyakan dalam sesi-sesi yang lain. Tapi untuk ini, sebab saya ada urusan yang panjang untuk hari ini. Silakan Perdana Menteri.
Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera. Tan Sri Mr Speaker, saya berterima kasih atas kesempatan yang diberikan untuk memberikan penjelasan. Pada 22 Januari 2026, terdapat laporan yang mendakwa Malaysia telah menyerahkan 5,207 hektar tanah kepada Indonesia sebagai pampasan bagi tiga buah kampung di kawasan Nunukan, berdekatan sempadan Sabah dan Kalimantan, iaitu Kampung Kabungalor, Kampung Lepaga dan Kampung Tetagas. Secara dasarnya Mr Speaker, pendirian kerajaan jelas tertakluk kepada undang-undang, perjanjian dan konvensyen yang berkuatkuasa. Dalam hal terkait
persempadanan semula dengan Indonesia, kita juga amat menghormati kesepakatan bersama sebagai negara sahabat di antara Malaysia dan Indonesia. Atas penentuan sempadan darat antarabangsa Malaysia dengan Republik Indonesia adalah berdasarkan dua konvensyen dan satu perjanjian. Untuk keseluruhan Sabah dan Sarawak, konvensyen persempadanan antara kerajaan British dan Belanda, Boundary Convention 1891. Untuk Sabah, Perjanjian Sempadan British–Belanda 1915 (Boundary Agreement 1915). Untuk sebahagian kecil sektor di Sarawak, konvensyen persempadanan antara Kerajaan British dan Belanda yang telah ditandatangani di Hague pada 26 Mac 1928, Boundary Convention 1928. Bagaimana penentuan jajaran persempadanan di kawasan Outstanding Boundary Problem (OPB) Sungai Sinapad, Sungai Sesai yang menjadi isu ketika ini adalah berdasarkan kepada Boundary Convention 1891 dan Boundary Agreement 1915.
Prinsip yang terkandung dalam perjanjian ini adalah penentuan kawasan berdasarkan kedudukan muara Sungai Sinapad dan Sungai Sesai di garis latitud empat darjah 20 minit utara iaitu di utara garis latitud empat minit 20 utara, kawasan itu adalah di bawah British, Sabah. Manakala di selatan garis latitud empat minit 20 utara, kawasan itu adalah di bawah Belanda, Indonesia. Kerja-kerja persempadanan dimulakan pada tahun 1977 bersama Indonesia dan Malaysia. Berdasarkan peta di dalam perjanjian tahun 1915, kedudukan muara Sungai Sinapad dan Sungai Sesai berada di selatan garis latitud empat minit 20 utara. Namun demikian, hasil daripada pengukuran bersama didapati Sungai Sinapad sebenarnya bermuara di utara garis latitud empat dan 20, bukannya di selatan. Maka pada pandangan Malaysia, semua lembangan sungai yang bermuara di utara garis latitud empat 20 tadi adalah kepunyaan Malaysia. Dan saya bentangkan juga peta supaya dapat difahami. Kawasan OPB sebelum ini, tidak boleh dianggap sebagai kawasan milik mana-mana negara kerana kawasan itu merupakan kawasan rundingan dan penentuan sempadan yang masih belum dimuktamadkan sejak dulu lagi. Saya ingin menegaskan bahawa penentuan sempadan tidak bersandarkan pada prinsip pampasan atau timbal balik atau untung rugi sepertimana yang didakwa. Sebaliknya, penentuan sempadan antara Malaysia dan Indonesia adalah bersandarkan kepada konvensyen dan perjanjian seperti yang dijelaskan tadi. Jarak
keseluruhan sempadan darat antarabangsa Malaysia dan Indonesia dianggarkan sepanjang 2,064 kilometer dan dibahagikan kepada dua sektor. Ada terpapar. [Sambil merujuk kepada paparan skrin] Sektor Sabah–Kalimantan Utara dianggarkan sepanjang 419.4 kilometer dan sektor Sarawak–Kalimantan Barat dianggar sepanjang 1,644.6 kilometer. Jadi, buat masa ini, hanya pengukuran sempadan sektor KALTARA yang telah dimuktamadkan. Yang melibatkan dua OPB Pulau Sebatik dan Sungai Sinapad, Sungai Sesai dalam kawasan OPB B2700 dan B3100. Bagi Outstanding Border Problem (OPB) Pulau Sebatik, kerja-kerja siasatan, penandaan, pengukuran semula oleh kedua-dua negara dijalankan pada bulan Februari hingga November 2019. Itu yang dikatakan hasil pengukuran yang diperolehi mendapati jarak muktamad East Pillar ke New West Pillar, 23.842 kilometer. Manakala bagi OPB Sungai Sinapad dan Sungai Sesai, kerja siasatan, penandaan, pengukuran yang dibuat sekali di antara pegawai-pegawai pemetaan Indonesia dan Malaysia dilakukan sehingga Ogos 2022 dan Oktober 2023. Itu jarak muktamad 11,545 kilometer. Jadi, proses pengukuran rundingan itu berjalan selama 47 tahun sejak 1977 diselesaikan secara berperingkat tetapi pada hemat kita, harus disegerakan untuk menjaga hubungan baik antara dua negara berdasarkan perjanjian dan konvensyen antarabangsa sepertimana disebut tadi. Dalam semua perundingan ini, kalau terkait dengan Sabah, seperti juga Sarawak, wakil Kerajaan Negeri Sabah, Chief Minister's Office, Sabah State Attorney General's Office, Sabah Lands and Surveys Department semua dilibatkan sepenuhnya. Setiap inci tanah dirundingkan, disepakati oleh Kerajaan Sabah sebelum dimuktamadkan dengan Kerajaan Malaysia dan Indonesia. Maka sebab itu, setelah ini dimuktamadkan, baru dirujuk ke Mesyuarat Ke-45 Jawatankuasa Sempadan Bersama Indonesia–Malaysia, 18 Februari 2025. Melalui MoU tersebut, OPB Pulau Sebatik, keluasan baharu yang diperoleh oleh Malaysia adalah sebanyak 0.05 kilometer persegi bersamaan lima hektar (12 ekar). Dan Sungai Sinapad–Sungai Sesai, Malaysia memperoleh kawasan tambahan seluas 7.8 kilometer persegi bersamaan 780 hektar atau 1,927 ekar. Keseluruhan kawasan pertikaian di OPB Sungai Sinapad–Sungai Sesai dalam kawasan OPB 2700 dan 3100 berjumlah 5,987 hektar dan kawasan ini sememangnya berada di kawasan pentadbiran Indonesia. Boleh lihat peta. [Sambil merujuk kepada paparan skrin] Itu kawasan yang daripada awal hak Indonesia tetapi
oleh kerana peta itu belum dimuktamadkan, kita tidak bersetuju tetapi selama ini sejak 1915, itu tidak dipertikai oleh semua Kerajaan Inggeris dan Kerajaan Malaysia sejak 1915. Ini yang dikatakan walaupun pada faktanya, tidak dimuktamadkan kerana perjanjian itu tidak ditandatangani walaupun ia menjadi milik dan di bawah pengelolaan Kerajaan Indonesia. Sempadan di kawasan OPB berdasarkan prinsip yang terkandung, sekali lagi saya tegaskan pada perjanjian 1915 iaitu 780 hektar jadi milik Malaysia tetapi 780 hektar 5,700— maaf. 780 hektar itu keluasan tambahan bagi Malaysia. 5,987 itu kekal di bawah milik Indonesia yang dimiliki oleh Indonesia sejak 1915. 2015, sorry. 1915. 1915, ya. Jadi, sebahagian kecil dari tiga-tiga kampung yang dikenali sebagai Kampung Kabulangalor, Kampung Lepaga dan Kampung Tetagas dengan sendirinya termasuk ke kawasan Malaysia. Sebelah di atas itu. Jadi, tiga-tiga itu dimasuk ke Sabah. Dakwaan berkenaan Malaysia menyerah seluas 5,227 hektar kepada Indonesia sebagai pampasan bagi tiga-tiga buah kampung di kawasan Nunukan adalah tidak benar dan penipuan, kalau pun tidak niat jahat sama sekali. Jadi, sebab itu kita harus terikat dengan perjanjian dan yang dapat yang dipertikai saya lihat itu di luar peta di belah bawah itu adalah kawasan yang dari awal sejak 1915 ditekankan dalam semua rekod kita menjelaskan ia tidak kita sahkan tapi tidak pernah kita tuntut sebagai milik Malaysia.
Tan Sri Mr Speaker, dalam rundingan seperti ini, tentulah ada beberapa hal yang agak sensitif ya kerana dalam rundingan dengan Indonesia tidak semua yang sudah selesai. Umpamanya isu lima kawasan sempadan darat, kawasan intertidal di sektor Sabah–Kalimantan Utara. Empat kawasan Outstanding Boundary Problem di sektor Sarawak–Kalimantan Barat yang masih dalam proses perundingan antara kedua-dua negara. Maknanya, belum dimuktamadkan. Sebab itu kenyataan-kenyataan kita harus berhati-hati dan berhemah. Kalau nak cari keuntungan politik sempit, bukan masanya. Bukan untuk korbankan kepentingan Malaysia atau korbankan kepentingan hubungan baik di antara dua negara. Jadi, saya nak jelaskan seperti mana tohmahan sebelum ini Ambalat, kita serahkan. Hal itu belum pun dimuktamadkan tetapi tohmahan daripada pembangkang sudah diserahkan. Saya tidak tahu serah wilayah mana. Jadi, sebab itu harus kita rujuk kepada angka dan data. Dan ini kita harus gunakan kesempatan ini juga mengucapkan penghargaan setingginya kerana
orang— pegawai-pegawai kita, Bahagian Hal Ehwal Persempadanan (Boundary Affairs Division) disokong oleh Bahagian Topografi (Topography Division), Jabatan Peguam Negara (Attorney General's Chambers), Bahagian Pemetaan (Mapping Division), Ministry of Defence, tentera. Itu terpaksa meredah ke hutan belantara untuk memastikan peta itu dimuktamadkan. Jadi, saya harap kalaupun pembangkang memilih untuk tidak menyatakan penghargaan dan terima kasih kepada pegawai-pegawai dan tentera...
[Dewan riuh]
Dak, belum. Kerana yang ada itu menghina. Kenyataan biadab, menghina, itu ada.
[Dewan riuh]
[Berucap tanpa menggunakan pembesar suara] [Spoke without using the microphone]
Apa tak betul? Termasuk Pendang.
[Tidak jelas] Pun tak tau. [Berucap tanpa menggunakan pembesar suara] [Spoke without using the microphone]
[Dewan riuh]
Kalau tak tahu, baik.
36(6), Tuan Yang di-Pertua.
Kalau tak tahu, baik. Kalau tak tahu tanya! Kalau tak tahu, jangan maki hamun! Tak tahu, tanya!
Oi, mengaku sahajalah kalau menghina.
[Dewan riuh]
Tuan Yang di-Pertua.
Baik. Jadi, inilah penjelasan saya, Tan Sri Mr Speaker.
36(6).
[Berucap tanpa menggunakan pembesar suara] [Spoke without using the microphone]
Lima lagi kawasan yang didakwa selesai.
[Berucap tanpa menggunakan pembesar suara] [Spoke without using the microphone]
Lima lagi kawasan yang didakwa selesai.
Hulu Langat.
Yang intertidal. Ya, saya ingin saya bacakan, Sabah–Kalimantan Utara, empat kawasan Outstanding Boundary Problem di sektor Sarawak–Kalimantan Barat, itu masih dalam proses perundingan antara kedua-dua negara. Jadi, saya harap rakan-rakan di Ahli Parlimen...
Tuan Speaker, Peraturan Dewan.
[Berucap tanpa menggunakan pembesar suara] Duduklah. [Spoke without using the microphone] Sit down.
Ahli Parlimen.
Peraturan Dewan.
[Dewan riuh]
Peraturan berapa ini?
36(12).
36(6).
Isunya apa dia?
Isunya tuduhan Perdana Menteri mengatakan bahawa kita memaki hamun.
Dan pembangkang biadab.
Dan pembangkang biadab.
Duduk.
Termasuk Pendang. Jadi, itu suatu benda yang saya rasa tidak parliamentary.
Ya, setuju.
Jadi, minta petua daripada...
Tak pernah kami buat macam itu, Tuan Yang di-Pertua!
Jangan guna peluang ini untuk menghentam. Terima kasih Tuan Yang di-Pertua.
Okey.
Sabarlah.
Tan Sri Speaker, Tan Sri Speaker, Peraturan Dewan 36(4).
Dah habis dah?
36(6) sebab sebut nama saya tadi, Pendang. Saya bagi tahu sebab kami ambil kenyataan ini, kenyataan daripada polis Indonesia yang menyatakan 5,200 hektar ini.
Ya.
Daripada Malaysia dimasuk kepada— bukan kami. Bila dibangkitkan...
Baik.
...Kami tanya lah. Kami tak pernah maki pun.
Ya.
Saya sebut dalam Dewan itu hari. Kami tak pernah maki Yang Amat Berhormat Tambun.
Baik.
Tan Sri, tuduhannya...
Kami tanya lah, jawab je lah.
Baik, baik.
Tan Sri Mr Speaker, tuduhannya...
Tan Sri, Tan Sri.
Mengatakan kami mengguna Islam buruk, jahat. Ini apa sebagai seorang Perdana Menteri ini?
Pendang, Pendang cukup.
[Dewan riuh]
Yang disebut...
Semua duduk, duduk!
Dah tanya, dah jawab. Sekarang, tengah jawab.
Tan Sri, hari itu semasa...
Kampar, Kampar semua duduk.
Hari itu semasa Pendang bangkit, saya sudah bangkit standing orders. Saya sudah bagi tahu itu fake news.
[Mengetuk tukul] Saya, saya, dengar, dengar. [Gavel struck] I, I, listen, listen.
Saya minta Pendang tarik balik, hari itu dia tak tarik balik.
[Mengetuk tukul] Kampar, Pendang. [Gavel struck] Kampar, Pendang.
Mana boleh bawa state fake news masuk Parlimen.
[Mengetuk tukul]
Dia bukan tanya hari itu, dia buat tuduhan.
Tarik balik.
[Mengetuk tukul] Kampar, Pendang duduk. Saya tak mahu layan dua-dua belah pihak. Saya nak bagi PM teruskan dan landing terus. [Gavel struck] Kampar, Pendang, sit down. I do not want to entertain either side. I want to let the PM continue and land it directly.
Tan Sri Mr Speaker. Saya sebut...
Tan Sri. Peraturan mesyuarat kena address Tan Sri. 36(4) dan 36(6). Yang Amat Berhormat kata pembangkang biadab termasuk Pendang. Is that proper dalam Dewan ini? Yang itu kerana rule, Yang Berhormat. [Tidak jelas]
Tan Sri Mr Speaker. Saya kata ada kenyataan biadab. Ada kenyataan yang menuduh saya khianat kepada negara. Ini yang kita kena betulkan.
[Dewan riuh]
Ya. Pegawai-pegawai kita bekerja bertungkus-lumus.
Yang Amat Berhormat, Tambun. Hari itu saya buat persoalan. Bukan saya maki hamun. [Tidak jelas]
Ya, bertanya soalan tapi. [Tidak jelas]
Pendang hari itu... [Tidak jelas]
Soalan yang biadablah itu! Soalan yang biadab! Itulah makin hamun. Itulah benar.
[Tidak jelas]
[Tidak jelas] Bila tak dapat, Tan Sri, saya tanya. Yang Berhormat Tambun hari itu jawablah.
Itu soalan biadab dan makin hamun.
Baik, saya buat keputusan.
[Tidak jelas] Kelab menjilat! [Unclear] Lickspittle club!
Saya menganggap PM...
Tan Sri, dalam konteks Dewan yang mulia Tan Sri, penggunaan kata-kata, ungkapan, pembangkang biadap. You allow that? 38(6).
Ya, PM pick up apa yang disebut di luar, okey. Silakan terus, PM.
Tan Sri di-Pertua.
Tan Sri, saya sedang di dalam Dewan.
Dah lah itu Pendang! Duduk lah Pendang! Enough, Pendang! Sit down, Pendang!
Depan Yang Amat Berhormat Tambun.
Hey, Pendang! Hey, Pendang! Sit down, sit down and let the PM answer, let the PM answer!
Hulu Langat.
Let the PM answer!
Hey, sycophant, sit down!
Baik, semua.
What is that "menjilat"?
Hulu Langat, Hulu Langat. We have guests, we have school students, we have Orang Asli. Show them respect. Kampar.
Tan Sri, I ask Besut to withdraw the word "penjilat".
Okay, okay, sit, sit. No more.
Unparliamentary, unparliamentary. You cannot use words like that.
Okay, listen. [Strikes gavel]
Besut.
Mr Speaker.
Kampar. Whoever stands up again, I will ask them to rest.
Besut, but he used the word unparliamentary.
Who? Kampar, one.
[Duduk]
Whoever stands up, I'll ask them to rest, okay? PM, please. If you finish, land it.
I will finish. Mr Speaker, I state that matters touching on national interests, including borders, should be discussed prudently. I have no problem with any opposition member asking questions. However, I strongly reject accusations and slander stating that we are treacherous to the country.
[Dewan riuh]
So, what is best
is that, because I have presented with facts and with maps, it is best to re-examine it. Some parts have not been finalised, some already have. In closing, Mr Speaker, we must take care. Our relations with Indonesia since 1974 have been very good. Negotiations have continued at all levels, and usually cooperation between the two sides' officials, at the lowest level right up to the Chief Minister and the Prime Minister, and between the Malaysian Government and the Government of Indonesia, has been very good. We may differ in opinion, but do not pass judgment, and also do not offend the feelings of our friends in Indonesia who are working to establish a very good and close relationship between the two nations. Thank you. [Applause]
Okay, thank you.
Tan Sri.
I want to give advice.
Mr Speaker, I would like to say thank you.
I have already not given an answer.
Mr Speaker, [Holding up the Standing Orders book] Mr Speaker.
Mr Speaker, I would like to take this opportunity to thank the Honourable Tambun. I raised it last week in my press conference, and I asked that the government table it in Parliament. What is this back-and-forth accusing about? Even if there are Honourable Members who raised this issue, it is because we read it from newspaper reports. That is why we asked that the Honourable Prime Minister table it in Parliament. Once it is tabled, we will accept it. If any further disagreement arises in future, we will ask again. That is our job. If the Honourable Member had spoken well earlier and had not raised accusations at all, I think this issue would not have arisen. We listen to everything.
Right. We're steady.
So that is why I request. We on this side were actually waiting; this is the answer we were waiting for. Because
if the answer is like this, the Honourable Member said that friendship has been very good between Malaysia and Indonesia all along. I agree. Not only that, we also have friends there. That is why we want an explanation. If there is already an explanation like this, I, on behalf of all Honourable Members here, say thank you. Do it again next time. Thank you. Assalamualaikum.
Okay, Honourable Member.
Mr Speaker, I would like to join in if possible, with permission under Standing Order 36(1).
I have already made a decision earlier.
Standing Order. Mr Speaker, because this matter is important. Having heard what was put forward by the Honourable Prime Minister, we must follow the rule of law. Standing Order 36(1) is clear enough in terms of law. I do not wish to raise other matters, because this is important to the future of respecting our nation's Constitution. Regarding Article 2(d) of the Constitution of Malaysia, no alterations can be made unless with the consent of the legislative assembly. That means the Sabah State Legislative Assembly and also concurrently, there must be concurrent approval from the Conference of Rulers.
Although the Honourable Prime Minister has already explained earlier... [Applause] ...I admit, I respect.
Baik, saya...
We can support it, no problem.
Semporna, I apologise. Listen— I apologise, Semporna. Because this is technical, I request, I request. If the Honourable Member speaks, we won't understand about it, because many have not had time to prepare. Therefore, therefore, I propose that this issue be brought by the Select Committee, discussed, and all those involved be summoned. Then, the Chairman of the Select Committee presents it, if they wish to present it.
My earlier concern...
That is what I meant. Otherwise, we will not finish today.
Iʼm worried about the constitution part of it.
I know.
With permission, Article 2(1), when the Honourable Prime Minister mentions the incident in the 50s...
That is why I said to bring it to the Special Select Committee. Let them examine it in detail. Then present it in this House if necessary, okay. Otherwise, it won't finish. Someone will stand up again here, okay. I apologise for that. Prime Minister, please.
This is the approval of the agreement finalised at the negotiation stage. The other processes must be followed. So, Honourable Member from Semporna, correct. That means the process has not yet started, nor has it been completed. I mentioned earlier that some parts have not been finalised. There is only a mutual understanding between the two leaders and the two governments so far. All rules touching on borders must be referred to the respective State Legislative Assemblies, which are in process; I mentioned earlier that it is in process. What has been finalised is at the government level. Then, to His Royal Majesty, the Conference of Rulers, which is on its agenda. Only, we want to decide whether it is tabled after everything is decided or after some parts are decided. Thank you.
Baik.
18(1), Mr Speaker. Standing Order 18(1).
18(1) and 18(2), yes. Mr Speaker, I have just submitted a motion on this matter, namely the need to debate both sides regarding matters that have been decided and matters that have not yet been decided. So, I request your guidance, Mr Speaker: should this matter be debated only by the Special Select Committee, or is there a special session involving both sides?
I will look at the Honourable Member's letter a little longer.
Please consider it, Mr Speaker. Thank you very much.
Okay. God willing, okay. Thank you.
Motion — Expressing gratitude for the Royal Address of His Majesty the Yang di-Pertuan AgongMotion
The Order of the Day was read to resume the debate postponed on the question: "That a speech be presented to His Royal Majesty the Yang di-Pertuan Agong, as follows: 'Ampun Tuanku, Patik, the Speaker and Members of the Dewan Rakyat of Malaysia in the Parliamentary Session, humbly beg to present a sincere speech on behalf of the Dewan Rakyat, expressing our many thanks and upholding our gratitude for the Royal Address of His Royal Majesty the Yang di-Pertuan Agong delivered at the opening of the Fifth Session of the Fifteenth Parliament.'" [29 January 2026]
Okay, thank you. I will invite the Ministry of Finance. Before I invite the Minister to wind up, I would like to inform you that today marks the start of the turn of Ministers to reply to the debate on the Motion of Thanks for the Royal Address, for four days, until Tuesday, 10 February. I would like to remind all Ministers and Honourable Members not to raise new issues, not to raise new issues while the Honourable Minister is replying. This is to give Ministers the opportunity to answer the issues raised by Honourable Members during the debate. Besides that, the Honourable Minister may also answer issues raised by Honourable Members who are present in this House. Meanwhile, issues raised by Honourable Members who are not in the House will be given written answers. Finally, to the Ministers, I have given a commitment to give— I remind the Ministers, I have given a commitment
to provide written answers to the issues raised during the debate on this motion. Therefore, they must be emailed to the Honourable Members within five days. An Honourable Member complained to me that he did not receive an email. That is why officers behind the scenes must make sure that, after the Minister commits to providing written answers within five days, it happens. Okay, I now invite the Minister of Finance to wind up within 40 minutes. Please proceed.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and Malaysia MADANI greetings. Mr Speaker, on behalf of the Ministry of Finance, allow me to humbly present the speech of thanks for the Royal Address of His Royal Majesty the Yang di-Pertuan Agong Sultan Ibrahim delivered at the Opening Ceremony of the Fifth Session of the Fifteenth Parliament on 19 January this year. As the first Minister to wind up, I express my appreciation to all Honourable Members who took part in the debate on the Motion of Thanks for the Royal Address of His Royal Majesty the Yang di-Pertuan Agong. A total of 50 Honourable Members debated and put forward proposals, comments and views relating to the Ministry of Finance. Based on the issues raised, allow me to answer several main points. Although the administration of the Kerajaan MADANI has only reached three years of age, various reforms have been implemented. Alhamdulillah, through sincerity and courage in driving structural reforms, we now witness tangible results in raising the economic ceiling and the floor of the people's well-being. And of course, the current economic performance as well as the fiscal position. Among the topics debated were those raised by the Honourable Larut, Pandan, Bachok, Batang Sadong, Tenggara, Puchong and Tebrau. In truth, all economic achievements are the result of the comprehensive approach of the Kerajaan MADANI. The Government has outlined a clear direction through the MADANI Economic Framework, which encompasses economic, social and governance dimensions over the medium term. The Government has made progress in implementing bold reforms, though unpopular, including
combating corruption, reforming government procurement, reducing the fiscal deficit and implementing subsidy targeting. Responsible and prudent economic management has built investor and investment confidence, and alongside efforts to facilitate business, it has energised investment and trade growth. Fiscal reforms have created financial space for the Government to increase spending for the comfort of the people and national development. If we look back at the fiscal reforms implemented. First, the fiscal deficit has been successfully reduced in stages. The direction of fiscal consolidation was set out in the MADANI Economic Framework and enshrined in the Public Finance and Fiscal Responsibility Act 2023, including a fiscal deficit target of three per cent over the medium term. Since then, we have succeeded in reducing the fiscal deficit from 6.4 per cent in 2021, 5.5 per cent in 2022, to five per cent in 2023 and 4.1 per cent in 2024. For 2025, the deficit is expected to reach the target of 3.8 per cent, and based on Budget 2026, it will fall further to 3.5 per cent this year. This reduction has been achieved, among other things, through broadening the tax base, including enhancements to the SST, and subsidy targeting, particularly for electricity, diesel and RON95. The national fiscal reform has also been recognised by international bodies such as the IMF in its report in December 2025. Second, the world recognises our rise and sincerity in bringing about change. Investor confidence and the country's competitiveness continue to be strengthened. Malaysia rose 11 places to 23rd position in the World Competitiveness Report (IMD). The Bursa Malaysia Index has reached 1,771 points, the highest in seven years, on 27 January 2026. The performance of the Ringgit's value continues to be strong and has reached its best level in nearly eight years, at RM3.92 against the US Dollar, as of 28 January 2016. This performance continues to maintain the Ringgit's position as among the best in Asia, and at the same time reflects market confidence in economic management and the Government's policy direction.
Tan Sri...
Approved investments for the first nine months of 2025 recorded RM285.2 billion, an increase of 13.2 per cent compared with the same period in 2024. And it is expected to continue to attract the highest approved investments in history, after reaching RM329.5 billion in 2023 and RM384.4 billion in 2024.
Third, the proceeds from subsidy targeting enabled the Government to save RM15.5 billion, which was reallocated, particularly for the benefit of the people, such as cash assistance and public facilities. Fiscal discipline has been implemented in stages to ensure a balance between reducing the deficit and an expansionary fiscal policy to support economic growth and national development. Finally, all these positive achievements have also been acknowledged by international credit agencies, as Moody's, S&P Global and Fitch respectively maintained their sovereign credit ratings at A3, A-, and BBB+ with a stable outlook. Overall, despite facing global economic uncertainty, economic growth has exceeded expectations. With the advance estimate of fourth-quarter (Q4) 2025 growth peaking at 5.7 per cent, the growth rate for 2025 is estimated to reach 4.9 per cent. Trade also grew strongly, exceeding six per cent and achieving the highest level in history at RM3 trillion. All these figures are not merely for pride. The question is, what impact is felt by the people after the country's economic and fiscal position has reached this positive level? In other words, how can the raising of the ceiling lift the floor? This was also asked by the Honourable Larut, Puchong and Tebrau.
Minister. Yes, because earlier the Minister mentioned the performance of the Ringgit. So, I want an explanation from the Minister. What are the underlying causes that have driven the Malaysian Ringgit's stronger performance— much stronger than our neighbouring countries' currencies? Thank you.
Thank you. I will answer, and then I will continue once more. If we look at the Ringgit, we can see that the Ringgit has appreciated to RM3.92. And demand for the Ringgit has risen sharply, because we can see that the flow of money coming into the country has also improved. We also feel— if we look at the investments approved by the Government, they have reached the highest level so far. So, because of the high confidence level, which is received from investment, this has further boosted demand for the Ringgit. Although we understand that in the United States, its interest rate has decreased, the Malaysian Ringgit nevertheless remains strong, more so than other currencies. So, it is not only because of weakness in the interest rate in the United States.
As I said earlier, the focus of the Kerajaan MADANI is that growth must be translated into jobs, wages, controlled inflation and more targeted assistance. If we look at the achievements, unemployment in November 2025 fell to 2.9 per cent, the lowest rate in 11 years. The economy is growing, investments are increasing, meaning job opportunities are more meaningful for the people. Second, the minimum wage has been raised to RM1,700 from RM1,500 a month. Government-linked investment companies (GLICs) and government-linked companies (GLCs) have implemented a decent living wage policy with a benchmark of RM3,100, which now covers 169,000 workers.
Briefly. Given the excellent economic performance, is there a possibility that Fitch Ratings could restore Malaysia's credit rating from BBB+ to AAA? Thank you.
Thank you, Honourable Bagan. We always uphold transparency in government policies, and in all engagements we have held with Fitch, they have been able to see the good reforms in Malaysia. So, God willing, in future, with continued good changes, we hope to be upgraded. Third, Gross National Income (PNK) per capita rose by more than 18 per cent, from RM46,247 in 2021 to RM54,793 in 2024. Fourth, the inflation rate in 2025 remained low at around 1.4 per cent, despite the fiscal reforms implemented through subsidy targeting and tax enhancements. Efforts to ease the cost of living continue to be intensified, with an allocation of RM1 billion. This includes RM600 million for the Jualan Rahmah MADANI to offer basic goods at affordable prices in all 600 State Legislative Assemblies (DUN) and 40 locations in the Federal Territories, at a frequency of three times a month. Fifth, the allocation of cash assistance for the people is the highest in history through the Sumbangan Tunai Rahmah and Sumbangan Asas RAHMAH. The allocation for STR and SARA has increased to RM15 billion, compared with RM8 billion under Bantuan Keluarga Malaysia in 2022 and RM6 billion under Bantuan Rakyat 1Malaysia in 2018.
Minister, Pulai, Minister.
For me, that is all; then I will give the floor. The number of aid recipients also increased from seven million to
nine million. The implementation of SARA not only helps the public but also generates economic spillover for local retailers and SMEs, particularly local products, thereby strengthening the domestic economic chain. Besides that, the government also provides other assistance such as the paddy subsidy and the paddy farmers' incentive initiative, RM2.62 billion. The School Opening Assistance (Bantuan Awal Persekolahan) of RM794 million and the Rubber Production Incentive of RM171 million. At the same time, the government always ensures that the fiscal space created through reforms is not lost but returned to the people through targeted assistance and fairer subsidies. This means that even as we carry out reforms, the rights and welfare of the people remain protected. When subsidy targeting is implemented, we examine the safest, most organised and most effective methods to ensure that the people are protected and that subsidy benefits truly reach the citizens who are entitled to them. In this context, the implementation of Budi MADANI RON95 is a clear example. The RON95 petrol subsidy is channelled in a more targeted manner so that leakages can be reduced and national funds are used for the people's priorities. Please proceed, Pulai.
Yes, thank you Mr Speaker and thank you, Deputy Minister. There is a view from economic experts that people should be given the freedom to use the aid or be given it in cash form, but we include it in the identity card. What is the government's view on this external view which states so, so that they have greater freedom to buy according to their needs?
Thank you, the Honourable Member for Pulai. If we look at the assistance provided by the government, some of it is given in cash, such as STR, and some of it we give for the purchase of basic goods through SARA. And I have observed from the aspect of the basic acceptance of SARA, its acceptance is very good. Nearly 99 per cent of the locations given to SARA are used by Malaysians. This means there is no problem with its use by the people. And this makes no difference when we look at the states. States such as Perlis, Kelantan, Terengganu, Sabah and Sarawak also recorded high usage. So, because we have a choice, some with cash, some with credit, it is sufficient for the people's use.
Therefore, as we saw earlier, I explained earlier about BUDI95, the government does not agree with the view of the Honourable Member for Pasir Salak who rejects the use of MyKad for social assistance and subsidies. On the contrary, the government views the use of MyKad, which restricts assistance and subsidies only to citizens, as having nurtured and cultivated a spirit of nationhood.
The government greatly appreciates vigilant and caring citizens who point out and channel information through official channels when there is abuse or an attempt to break the rules, with permission, to break the rules, especially by non-citizens who attempt to use subsidised petrol. This attitude not only defends the right as citizens, but also reflects a shared spirit of nationhood in ensuring that government policies are implemented fairly, with integrity, and in favour of the people of Malaysia. With a economic foundation that is increasingly strong, Budget 2026 also focuses on two matters, namely strengthening economic resilience and expanding opportunities for the people, particularly access to business financing and home ownership. Strong growth must be supported by an inclusive financing ecosystem so that SMEs can grow and young families can own their first home. For...
Tan Sri Speaker...
I will finish, I will give way. For the information of the Honourable Member, financing and guarantee facilities have been increased to RM50 billion in 2026 compared with RM40 billion in 2024. This includes the Business Financing Guarantee Scheme (SJPP), which has been increased to RM30 billion to benefit more than 30,000 SMEs, as well as a specific guarantee of RM10 billion for bumiputera SMEs. This year too, Bank Negara Malaysia has also added RM2.5 billion to SME loan funds and introduced the SME Financing Guarantee Scheme of up to RM10 billion through cooperation with Credit Guarantee Corporation to give more opportunities to local entrepreneurs to gain access to financing. As announced by the Right Honourable Prime Minister, the government has also set a condition that these new financing facilities do not only concentrate on the same group, but instead benefit
customers and companies that have never received facilities so that these opportunities are truly widespread and fairer.
Tan Sri...
Financing facilities are also important for households, as I said earlier, particularly for home ownership. Between January and September 2025, banking institutions disbursed RM69.9 billion for first home purchases, benefiting 155,000 borrowers. The approval rate for these new housing loans also remains high, namely for homes valued at RM300,000 and below, the approval rate is 76 per cent. To ensure more Malaysians own their first home, the government together with BNM and financial institutions has facilitated housing financing. This includes the Housing Credit Guarantee Scheme (SJKP) which helps low and middle income groups, including individuals without salary slips or fixed income, to obtain first home ownership. Budget 2026 provides SJKP guarantees of up to RM20 billion to benefit more than 80,000 first-time home buyers.
Tan Sri.
Yes, sorry. I have to return to SARA because the Minister has gone too far. What is being debated is the proposal to expand SARA to more small and micro traders and also hawkers. This is because what we see today is that of the 9,000 shops that can obtain SARA, only 3,000 are small individual retail shops. The rest are chains such as Speedmart, 99mart, or supermarkets like Lotus's, MYDIN and others. This means that SARA allocations only benefit a limited number of traders. In my proposal, the government should expand it further so that more traders can receive this allocation. Why? Because if we give more micro and small hawkers, the multiplier effect, economic multiplier effect with this allocation will increase. And also, hawkers such as those at night markets and morning markets, who are precisely the ones whose income we want to increase. What is the Minister's view? And second, regarding the limit, the reason for quickly expanding SARA is that we are using MyKasih. When we use
MyKasih, we use a POS system, P-O-S, which is very difficult. Does the government intend to create a voucher system either within MyDigital ID or through e-wallets? This is in my debate which has not yet been answered by the Minister.
Minister, a little. Bachok. May I?
Thank you. Thank you. Tan Sri Speaker, earlier the Minister commented on the national fiscal policy. I ask― because we heard and we read what was mentioned by the Honourable Member for Pandan. I think the allegation is rather serious. He mentioned questioning the accuracy of the national deficit figures, that there are figures of unpaid tax refunds since 2020. So, it was stated that the 2024 deficit figure is actually between 5.8 to 6.0 per cent, not 4.1 per cent as reported. So, is the Pandan allegation true? Because this is very serious, questioning the validity of the national fiscal figures. And a little, Honourable Minister. If possible, at the end, please also touch on the issue of buy now, pay later. Young people outside want to hear this because it greatly affects the financial risk of the 30s and 40s segment. Thank you, Minister.
Terima kasih.
Minister, here is a little proposal about SARA too.
Please. Last one.
Thank you. So, my proposal regarding SARA too. Can we― I understand, it is said, that it is difficult if we make a negative list for items that can be bought with MyKasih, SARA and so on. So, my proposal to help local traders, can we first include all frozen food produced by local traders so that local vendors benefit, and at the same time give Malaysians more options to use the SARA and MyKasih money they receive too? Thank you.
Thank you. There are three questions. Two regarding SARA, one regarding what was raised by the Honourable Member for Pandan. The Honourable Member for Pandan, I will get to it in my winding up. I will touch on it later. For SARA― thank you for any proposals given. Perhaps I will give a little explanation of what we are focusing on doing at the moment. At
the moment, we have seen that in 2024, only 700 shops were recognised for SARA use. But last year, we achieved 10,000. It has been expanded greatly. As the Honourable Member for Puchong said, 3,000 of them are small shops. And earlier this year, the Right Honourable Prime Minister also targeted that we want to increase these small shops from the 3,000 currently to 10,000 before the end of this year. And, God willing, this will be done under the government. So, this will further widen the gap that exists. So, more people will enter the SARA scheme. But, as I said earlier, in terms of its usage there is no problem because its usage reaches 99 per cent. So, we do not think people cannot use it because there are not enough shops. For the approach for small traders, we also emphasise the use of local goods. God willing, this will be improved and, God willing, in the future it will be announced that we will expand it to frozen goods that will be allowed under SARA. So, for other proposals, I take note and I will continue to discuss with the SARA team which ones can be implemented, and which ones are still under evaluation.
Tan Sri, one more. Earlier the Minister answered about small traders. What about hawkers who sell at public markets, who sell at night markets and perhaps also by the roadside, MyKiosk, such as these? Because, if we compare with Singapore, they have 24,000 small hawkers who can benefit from the CDC voucher.
Can we do this? Because what I see is hawkers. If we can increase their income through SARA, it will help greatly in improving their quality of life.
Thank you, Puchong. As I said earlier, we take the proposal, we will look at it and discuss it with his team. He takes time to study it properly. I will return to my winding up and I will touch on what Pandan said earlier, I have not forgotten.
The Honourable Member for Larut also raised concerns about foreign fund outflows. As of 31 December 2025, the value of equity adjustment outflows was around USD5.2 billion or RM22.3 billion. Although the Malaysian equity market recorded foreign fund outflows in 2025, foreign fund inflows into the national bond market were much larger, reaching USD6 billion or RM25.6 billion. The overall trend shows that Malaysia remains a stable investment destination. This can be seen through the continued inflow of foreign funds into government bonds, which is a matter of concern for investment confidence in Malaysia's economic stability. The month of January 2006 showed positive investment sentiment. For both the equity market and the bond market. Each recorded fund inflows exceeding RM1 billion. The Honourable Member for Bagan and Putrajaya touched on the question of tax refund overpayments. And I also wish to correct the allegation raised by the Honourable Member for Pandan regarding the validity of the fiscal reforms achieved by the MADANI Government. The fiscal reforms under the MADANI Government have been strengthened through the Public Finance and Fiscal Responsibility Act (FRA) 2023. This Act builds fiscal transparency and sets clear medium-term fiscal targets to ensure public finance sustainability, maintain microeconomic stability and safeguard the welfare of the people. This commitment is proven through the trend of a gradual reduction in the deficit. As I have explained, towards three per cent by 2028. The government succeeded in reducing the deficit from 60.4 per cent in 2021 to 30.8 per cent, which is expected to be achieved in 2025. The calculation of the government's fiscal deficit should not be questioned. The reporting used is valid based on international standards and accepted by credit rating agencies and global bodies. Deficit reporting is based on the Government Finance Statistics Manual, which is also applied by other countries. The Auditor General also gave the opinion that the financial statements of the Federal Government present a true and fair view. The Federal Government's Accounting and Financial System based on the cash basis is not something unfamiliar. Cash-based financial practice is the standard internationally and is adopted by developed and developing countries
such as Singapore, India, Germany, the Netherlands and Norway. The MADANI Government inherited high tax surpluses, but the government has nevertheless fulfilled its responsibility of handling tax refund cases properly. As enshrined in the national Constitution, excess tax payments collected by the Inland Revenue Board of Malaysia must be refunded to taxpayers based on the prescribed procedures. Tax refunds settled in 2025 were the highest in the past five years, namely RM22.45 billion. If we compare excess tax payments in the three most recent years, the MADANI Government settled refunds totalling RM56 billion, which is 50 per cent higher than the refunds of 2020 to 2022, amounting to RM37 billion. Part of the refunds totalling RM7.5 billion was made in December 2025. Compared with the initial commitment of RM4 billion announced by the Right Honourable Prime Minister on 6 December 2025. All cases for Year of Assessment 2022 and earlier were completed in 2025. The settlement of excess tax refunds involved 3.7 million cases in 2025 compared with 2.7 million in 2024. Although the government promised to settle cases for assessment year 2023 in the first quarter of 2026, we are confident that the settlement will be earlier, namely by February 2026. Refunds for Year of Assessment 2024 will be fully settled before the end of this year. At the same time, refunds regardless of age, cases will continue to be processed for all taxpayers other than companies. The government indeed complies and will pay compensation of two per cent per annum for any late refunds, as enshrined in the Income Tax Act. So far, compensation payments totalling RM23.6 million have been made for some refunds in 2025. As a responsible government, the commitment to pay compensation will be fulfilled and this matter is not compromised. Although the Honourable Member for Bagan and the Honourable Member for Tasik Gelugor raised the issue of outstanding GST refunds, I would like to confirm that the government has settled all GST refund claims that are payable. When GST was abolished in 2018, the outstanding refund claims reached RM19 billion. All claims have been refunded except for about RM30 million that was not settled for certain reasons. This
includes claims still being heard in court or refund information such as incomplete company bank accounts. So, I consider the GST issue to be resolved. In terms of fiscal reform, it does not mean imposing burdens. The principle is clear: fair collection, a transparent process and compliance made easier through digitalisation and implementation assistance. I would like to explain regarding the implementation of e-Invoice. As raised by several Honourable Members, among them Bagan, Puchong, Bakri and Putrajaya. As informed, the government has reviewed and raised the annual sales threshold for exemption from e-Invoice implementation twice in 2025. From RM150,000 to RM500,000 on 5 June 2025, and then to RM1 million on 6 December 2025. This phased approach has benefited more than one million taxpayers, particularly hawkers, small traders and roadside stall operators, by exempting them from e-Invoice implementation. In continuous efforts to help traders implement invoicing, the government has also introduced two more facilities, namely the granting of an additional transition period of 12 months. From 1 January this year to 31 December this year. For the fourth phase, which allows taxpayers to issue e-Invoices, it is consolidated and there is no penalty or fine imposed if non-compliance occurs during that period. And second, MyInvois e-POS, which is a digital point of sale platform. With this platform, POS providers do not need to invest to develop their own system because it is accessed free of charge. It has even been extended to traders with annual income of up to RM5 million for the purpose of integrating main business operations such as sales coding, inventory management, financial investment and support for e-Invoice implementation. The Honourable Member for Bakri raised complaints that e-Invoice implementation is considered complicated and burdensome because SMEs need to fill in 55 data fields for each invoice. For information, of the 55 data fields, the number that is mandatory is 35. Of the 35 mandatory data fields, SMEs only need to fill in five data fields. Because most information will be filled in automatically through the business system or point of sale. And because we also provide up to RM5 million in sales, most SMEs can use this system free of charge.
In addition, QR code scanning facilities are also provided so that sellers can obtain buyer information more easily and quickly without the need for manual entry.
It must be emphasised that the implementation of e-Invois is not a new tax, nor does it concern an additional tax on tax givers or payers. e-Invois, as implemented in various countries, aims to address revenue leakage through real-time transmission of invoice data, which improves the efficiency of verifying trends in shadow economic activity so that risk analysis and investigations can be carried out more accurately and with greater effectiveness. As of 4 February 2026, around 981 million e-Invois had been issued in total, showing that this system is widely used by taxpayers across the country. To ensure that the compliance process is carried out fairly and prudently, LHDN (Inland Revenue Board of Malaysia) has used a nudging approach as an initial compliance measure to raise awareness and give taxpayers the opportunity to make corrections and voluntarily submit the appropriate tax information. Based on a preliminary review of the first and second phase data, a total of 17,188 taxpayers identified as non-compliant in filing and in the income tax declaration form have voluntarily come forward to submit the BNCP (Income Tax Declaration Form), involving income for previous years amounting to RM1.4 billion...
[Bangun]
...Which contributed to additional tax totalling RM290 million. This is proof that the early compliance approach and the encouragement of voluntary compliance can produce positive results.
The Honourable Minister.
I did raise in my debate, not on taxation, but on the additional expenditure estimates from the government when it was announced that early childhood education will be brought forward, with 5 years of preschool made compulsory and, at the same time, Darjah 1 at age 6. And when national schools in particular will be integrated
with preschools, this means more than 7,000 preschools will be built in every single national school. At the same time, classrooms will also be multiplied, otherwise the children will be in a 'sardine tin.' Up to today, we still do not know the total estimated additional expenditure the government will provide for this policy. Has that estimate been calculated by the Ministry of Finance? Thank you, Honourable Minister.
Thank you, Muar. I think this issue is a new issue, yes. There will also be clarification through the Ministry of Education, and the early data has also been explained in the House last week, where we have also provided RM800 million to recruit new teachers, and we are now looking at DE (Development Expenditure), how we can use it to add to the existing classrooms in this country. I will let the Ministry of Education (KPM) answer that. Perhaps I will move on to the matter of time— if I may request three more minutes, additionally?
Boleh, silakan.
A few important points I would like to emphasise regarding the important expenditure issues for the country. The Honourable Member for Simpang Renggam claimed that development expenditure allocation is lower compared with other ASEAN countries. In fact, Malaysia's development expenditure exceeds four per cent of GDP (Gross Domestic Product), while Thailand and Singapore are only around three per cent and Indonesia is below two per cent. Under the FRA Act, the government has committed that development expenditure will not be less than three per cent of GDP. As is well known, the tabling of Budget 2026 was framed with a more comprehensive fiscal approach, covering not only Federal operating and development expenditure, but also catalytic investment by government-linked investment companies (GLICs) and government-linked companies (GLCs), BPP and selected MKD companies. This approach optimises the nation's resources under one common direction and continuity in line with national priorities, and ensures the economic impact and well-being of the people are at the highest level. Budget 2026, totalling RM470 billion, presents a more comprehensive picture of public expenditure, and also includes RM50.8 billion of public
investment by entities such as Khazanah, KWAP, Pengurusan Air Berhad and Prasarana. Public expenditure for 2026 totals RM470 billion, an increase from RM450 billion in 2025. As emphasised, the Kerajaan MADANI is committed to achieving the FRA target, while still implementing an expansionary fiscal policy to support economic growth momentum, especially amid global economic uncertainty. The allocation of DE for Basic DE in 2026 has also increased to RM57.6 billion or 71 per cent, compared with RM55.6 billion or 65 per cent in 2025. For the information of the Honourable Member for Pasir Puteh, DE for 2026 for all states has also increased compared with 2025. To ensure a balanced and comprehensive distribution, the RMK13 has also approved projects that take into account the priorities of each state. Therefore, the Kerajaan MADANI will continue to ensure a disciplined, strategic fiscal approach that does not neglect the interests of the people, providing sufficient and high-impact development allocations so that economic growth continues to be driven sustainably. About 13 Honourable Members touched on the special grant to Sabah, including the Honourable Members for Semporna, Tuaran, Sandakan, Sipitang, Keningau, Kota Marudu, Kudat, Penampang, Tenom, Beaufort, Ranau, Putatan and Kota Belud. Referring to the decision of the Kota Kinabalu High Court on 17 October 2025, relating to the review of the special grant to Sabah. The Federal Government has affirmed that it will not appeal the special grant based on 40 per cent of the net revenue amount obtained by the Federal Government from Sabah. The Federal Government respects the principle of this special grant as enshrined in the Federal Constitution. The Federal Government is committed to working together with the Sabah government to review the special grant to Sabah by taking into account the rate of 40 per cent of revenue. The Federal Government held negotiation sessions with the Sabah government on 17 November 2025 and 28 January 2026 to carry out an early review of the amount of the special grant under Articles 11C and 11D of the Federal Constitution. Negotiations will continue to be pursued towards finalising the review and determination of the special grant to Sabah, in line with the timeline set by the court.
Mr Speaker, there may be some questions that I did not have time to answer today; I will provide them in writing. Let me conclude my winding-up...
Soalan tambahan.
Sukacita saya...
Supplementary question, Honourable Member.
I record my appreciation and thanks for the views and input shared by the Honourable Members throughout this debate.
Mr Speaker, supplementary question.
Malaysia MADANI...
Pencerahan.
Now we are on the right track. We simply— we have a clear direction, and the world has recognised our sincerity and resurgence in bringing about reform. We must not become complacent with the achievements obtained; much more still needs to be done. Therefore, all parties need to join hands and play our roles together...
Tuan Speaker.
...Regardless of leaders and the people, the public and private sectors.
Honourable Minister, may I ask for clarification?
...Workers and employers, to continue to sustain this momentum for the sake of our beloved Malaysia.
Clarification, Honourable Member.
Insya-Allah, through the close cooperation of all parties, we are able to advance the nation's economy and ensure that the fiscal reforms implemented truly improve the quality of life of the people in a comprehensive and sustainable manner. That is all. Wassalamualaikum warahmatullahi wabarakatuh. Thank you.
Honourable Member, you may ask...
Tuaran, sorry. This is the Minister's floor; he has not allowed it, and he said, "That is all, thank you."
Clarification, just one question.
Yes, there is no room for that. The Honourable Member may meet the Minister shortly.
Because he answered earlier, we want to thank him for exercising the 40 per cent entitlement.
Yes, you are welcome.
We want to ask whether the negotiations can be concluded by 15 April, that is all. We are asking that during the debate, to request an explanation.
The Minister has sat down.
Minta penjelasan.
Thank you, Minister. Later the Honourable Member may meet the Minister outside, okay. Now, I invite the Minister of Rural and Regional Development— 40 minutes, Minister. Please proceed.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Salam Malaysia MADANI. Salam Desa Sejahtera. Mr Speaker and the respected Members of the Dewan Rakyat, I wish to express my gratitude for having the honour of conveying to His Majesty the Yang di-Pertuan Agong, Sultan Ibrahim, who delivered His Royal Address on 19 January last. Mr Speaker, a total of 35 Honourable Members debated and raised 51 questions, highlighted issues, put forward proposals and also views to the Ministry of Rural and Regional Development (KKDW) and the agencies placed under my supervision, such as FELDA, NADMA, the National Cyber Security Agency (NACSA) and other agencies, during the debate on the Motion of Thanks for the Royal Address in this esteemed House.
With your permission, Mr Speaker, I would like to express my thanks to the Honourable Members who were involved in raising questions to the KKDW: the Honourable Member for Sepitang; Rantau Panjang; Tangga Batu; Bachok; Puncak Borneo; Hulu Terengganu; Tumpat; Sri Aman; Sik; Padang Terap; Kuala Nerus; Betong; Jelebu; Kuantan; Tenggara; Jeli; Rompin; Kudat; Mersing; Kuala Krau; Selangau; Tenom; Batang Lupar; Kota Marudu; Lubok Antu; Setiu; Libaran; Pekan; Jempol; Merbok; Kuala Terengganu; Padang Rengas; Bukit Bendera; Parit; and Tanjong Manis. With your permission, Mr Speaker, I will try to answer as far as possible all the questions that have been raised. Firstly, I would like to mention TVET. Before 2023, the estimated number of students registering at TVET centres was 150,000 per year. However, after the MTVET secretariat was placed under the Office of the Deputy Prime Minister, alhamdulillah there was an increase in student intake, where the average intake is 200,000 per year, and the total number of TVET students now has increased to 580,000 students. Under this supervision, up to 31 December last year, we found that employability increased to 98.7 per cent. As for the remainder, they either continue their studies at other higher education institutions or are in the stage of undertaking entrepreneurship. This means, for the information of this esteemed House, students who have followed TVET courses, there are 1,398 TVET institutions across the country, and their employability is 100 per cent. Alhamdulillah, this is an achievement that we are deeply grateful for. In addition, for the KKDW, there are 281 TVET institutions placed under this ministry. As with the rebranding to TVET MARA, we have merged, with your permission, institutions such as MJII or Malaysia-Japan Industrial Institute, KPTM and also the MARA Skills Institute, yes. We have merged them and branded them as TVETMARA. That is for the High TVET Training Programme, with your permission. In addition, we continue to strengthen GIATMARA, Akademi Kemahiran KEMAS, Kolej Universiti Agrosains Malaysia, Institut Kemahiran Tinggi PERDA and also Kolej KEDA. Under the KKDW alone, we offer 580 courses based on practical skills with enrolment exceeding 80,000 students, and have
produced 24,000 graduates up to 31 December last year. This is in line with local economic potential in the agro-industry, construction, services, technical maintenance and micro, small and medium enterprises sectors. Referring to the views raised by the Honourable Members for Sik and Rompin on Desa Kirana, I would like to mention that, to support the Visit Malaysia Year campaign this year, KKDW has introduced the Desa Kirana Programme at 25 focal locations that packages tourism focusing on rural areas based on natural heritage, gastronomy, traditional products and community activities, with the target of attracting around 100,000 visitors and an expected increase in community income of up to 20 per cent above the usual level. Meanwhile, both Honourable Members also raised the matter of PROSPEK or the Integrated Village Economic Development Project. In this regard, PROSPEK and the Desa Lestari Programme have been implemented to optimise idle land and strengthen cooperatives and the local economy. Since 2018, a total of 31 PROSPEK projects have been approved with an allocation of RM197.2 million. Meanwhile, up to 2025, this allocation has also been approved amounting to RM191.5 million through the Desa Lestari Programme to support 174 community cooperatives. For village investment hubs, to accelerate regional development, strategic cross-regional cooperation with corridor authorities and the Regional Development Authority has identified 15 high-impact projects expected to create 5,621 new job opportunities and generate a local economic increase of 142.45 per cent. Mr Speaker, the Honourable Members also asked about migration from rural communities to urban areas because job opportunities were found to have decreased somewhat. I would like to share with this esteemed House that, based on the Malaysia Migration Survey 2024 report by the Department of Statistics Malaysia (DOSM), the rural-to-urban migration rate in 2024 has decreased from 2.4 per cent to only 0.5 per cent. This means that the KKDW, together with other ministries and agencies, has succeeded in bringing industries and job opportunities to rural areas, causing a decline in what is referred to as horizontal social mobility. Alhamdulillah, this is an achievement that is very, very good.
Next, I would like to refer to another matter raised by the Honourable Members for Rantau Panjang, Mersing, Merbok, Kuala Terengganu, Padang Rengas, Bukit Bendera, Parit, Libaran, and Pekan regarding a new field or task that has been assigned by the Honourable Prime Minister to the Deputy Prime Minister (TPM), namely the NACSA, an agency under the National Security Council, which I have been asked to supervise.
Through NACSA, or the National Cyber Security Agency, this agency is finalising the Cyber Crime Bill, which is much discussed by the public. This law will be known as the Cyber Crime Bill, or RUU Jenayah Siber, to replace the Akta Jenayah Komputer 1997, known as Act 563. This Act is important because we have seen many cyber frauds, and insya-Allah, we are resolutely determined to table this Bill in this year's Parliamentary sitting. And, in such circumstances, I would like to mention that this bill will be drafted using a more holistic, up-to-date and technology-neutral approach to close the gaps in existing laws, strengthen investigation and prosecution capabilities, and protect the nation's cyber security and the rights of users in the digital space. In the context of hybrid conflict, deepfake technology and the spread of misinformation, disinformation and malinformation, or MDM for short, have been identified as the main instruments of information warfare, as proven in the Russia-Ukraine conflict where information manipulation was used to shape perceptions, weaken morale and influence international support. Furthermore, the Akta Keselamatan Siber 2024, also known as Act 854, which came into force on 26 August 2024, aims to strengthen the national cyber security ecosystem through the implementation of more effective cyber security functions with digital safety, and is seen as a strategic element to ensure national stability and protect the economic and social interests of the people.
Alright, Minister, it is now 1 o'clock. Minister, you may...
I request that it be extended a little. After that I will stop.
I allow it. If possible, Minister, please finish within 15 minutes.
I will comply with that instruction.
So, will it not continue this afternoon?
Tak sambung.
Okay, we will continue until 1.15. Please proceed, Minister.
Ya.
Okay. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Speaker. Thank you, Honourable Member. I asked about the issue concerning NADMA, about the syllabus for NADMA as well as disaster safety education centres for the public. So, I am worried that it will not be mentioned within these 15 minutes. I request an answer. Thank you.
Sila Menteri.
Mr Speaker, that is another topic that I will touch on later, but for now, let us focus on cyber security first. NACSA has also established the Cyber Security and Cryptology Development Centre because on 14 January last, the Cabinet agreed to the establishment of the Cyber Security and Cryptology Development Centre through the centralisation of cyber security and cryptology functions as a complement to the formation of a cyber ecosystem that is— the nation's cyber space that is integrated, resilient, competitive and sovereign. Likewise, NACSA and the National Security Council (MKN) also affirmed that cyber security awareness is a shared responsibility, with the Cyber Security Awareness Coordination Committee acting as a platform for coordinating awareness campaigns at the national level. Likewise, under the Malaysia Cyber Security Strategy 2025 to 2030, NACSA has enhanced the elements of research, development, commercialisation and innovation, which are given emphasis for the development of secure and competitive local technological capabilities, particularly in critical operating systems, security information analysis, strategic data management and decision-making support. And overall, this MCSS, or this policy, will emphasise and stress that dependence on foreign technology cannot be accepted— accepted passively, but must instead be assessed strategically while building the foundation of RDCI as well as strong local cryptographic capabilities.
Now, I will go to NADMA. Regarding NADMA, the Honourable Member for Puncak Borneo, Tumpat, Kuantan, Tenom and Libaran have raised this issue. I would like to mention that NADMA has improved the method of distributing Ex-gratia Aid (Bantuan Wang Ihsan), which implements applications digitally through the MyIBJKM application starting from the last northeast monsoon (MTL). Applications have been made by all disaster victims, whether they have relocated and stayed at PPS or temporary evacuation centres or not, simply by scanning a QR code. For victims who do not have the skills to use the application or have no internet access, assistance will be provided by officers and volunteers of the Department of Social Welfare (JKM) at the PPS. Honourable Member.
Thank you, Minister. The issue is that in our country, we have PPK. There will be PPK: Permanent Selection Centre (Pusat Pemilihan Kekal). Previously, we had PPS and we did provide assistance. Floods occur throughout the country almost every year, and now disasters are not only caused by floods but also, perhaps, by earthquakes and other things. So, what I emphasise is whether NADMA will have a disaster safety education centre for our people in the community, whether in major cities or locations where disasters frequently occur? For example, the people of Kelantan are used to floods, but if tourists come to Kelantan, they may not be familiar with flood conditions, and if there is no education, no centre where they can learn, this will cause them to possibly be trapped, that is one thing. Second, disasters will become something that is frequent and common to experience— because we are experiencing a global environmental crisis. So, preparing our children is very important, especially for their livelihood, because without a consistent centre explaining this matter, we see it will become a harm in the future. I myself have seen in Japan, for example, all their major cities require their children and communities to attend and learn theory and simulations at their disaster safety centres. So, I think with NADMA's presence, now making PPK, if it can be twinned together, not only one centre but also a syllabus must be made so that we can help the people to face disasters. Thank you.
Tan Sri Mr Speaker, I congratulate you. This is a good proposal, but I would like to suggest that it
be initiated first by the Kelantan State Government, to demonstrate commitment, and NADMA will help. So, a good proposal should be started in one's own place first.
Insya-Allah, if there is assistance from NADMA, insya-Allah we can begin.
And, please convey my greetings to the Right Honourable Datuk Panglima Perang, Menteri Besar of Kelantan. For permanent evacuation centres, as far as possible NADMA will have more allocations to replace PPS with PPT, and we have already started this matter, and insya-Allah, we will increase it.
This is for Tumpat, Dato' Seri. Tumpat is indeed specific for PPK. I asked because my question is specific and will be during the debate.
I will meet the Honourable Member myself. And, I would like to inform you that we have an early warning system, namely the early warning system (sistem amaran awal), where before excessive rainfall or clusters of rain-bearing clouds occur. The new approach we have taken is to give warnings to black spots in certain areas or locations to carry out evacuation. That is, five days or three days before a major flood, we provide facilities for evacuation. And unlike before, when it had already happened, people were then in a panic or busy to evacuate, and this is a game changer that we have done. Rantau Panjang, I know its area often floods and I always help. Wait a moment, let me finish my sentence first.
Terima kasih.
Likewise for some of the assistance we have given, from the last northeast monsoon, where NADMA has an SOP, after three days out of the temporary evacuation centres, only then is assistance given through Bank Simpanan Nasional.
From the list we have obtained from JKM and other agencies, but from the last east monsoon, I have instructed the Director-General of NADMA to provide assistance while victims are still at the temporary evacuation centres. So when they return to their respective homes, the money can be used to clean the house, repair damaged items
or buy other equipment, and this is a game changer that we have done. Please, Rantang Panjang.
Thank you, Mr Speaker, thank you Honourable Deputy Prime Minister for the efforts made through NADMA to help the community in need. My question is that the solution to this flood issue needs to be looked at urgently, because the issues that arise, for example in the Rantau Panjang Parliamentary constituency, are very high-risk areas, including Tumpat and other areas. The issue is that when there is flooding, stagnant flooding (banjir termenung) occurs, as the Honourable Member once came to my area and proposed that equipment be bought for high-power engines to solve the stagnant flood problem. Until today, not a single unit has arrived and until today there is no solution. So, what mechanism will the government take into account so that losses do not continue to happen to the people? Because the RM1,000 ex-gratia aid is not a solution for communities who face floods every year. Please explain.
Apart from us adhering to the sixth pillar of faith, believing in qada and qadar. That is the stance of my friends in the party that is very close to my heart. We must use several emphases. [Reciting a verse of the Quran] And in that situation, what the Honourable Member mentioned, yes, the high-power pump has been provided by JPS, but in Rantau Panjang it is not suitable because when the excess water from the flood is pumped out, whereas Rantau Panjang has terrain higher than sea level. So, the water flows back in. This also happens in my area in Bagan Datuk. The same problem. The solution must be a long-term solution. In my opinion, the Local Flood Plan (Rancangan Tempatan Banjir, RTB) must be carried out with cooperation from our neighbouring country so that there is no release of water from neighbouring countries into our areas that will cause increased flooding. So, in this matter I think, I think, I will discuss with the Right Honourable Menteri Besar of Kelantan, the Director-General of JPS and also the Deputy Prime Minister II who is in charge of JPS and in charge of flood mitigation, so that we can carry out a long-term solution to solve the problem. Not only in Rantau Panjang, in Tumpat, but in other states as well. Insya-Allah, I will do it. So in this matter I would like to extend...
Honourable Member for Bagan Datuk, Puncak Borneo, want to ask for a little clarification, may I? Thank you, Honourable Deputy Prime Minister. In the previous debate, I mentioned the problem of PPS, and I am very honoured and thank you earlier because although they did not relocate to PPS, they were given the opportunity to receive flood ex-gratia aid too, but if possible, the Honourable Deputy Prime Minister's ministry could provide clearer information so that we as people's representatives can disseminate it to flood victims in our areas. And second, I would also like to ask for clarification because in my area there are places that flood up to three times a year, and what has been understood from the Department of Welfare and also NADMA, flood ex-gratia aid can only be given once, but what about those who experience floods up to three times a year? Are they eligible to apply to receive aid for the third time? Please clarify, Honourable. Thank you.
Thank you, Mr Speaker. I am well aware of what happens in Puncak Borneo and in other places regarding the flood problem that occurs three times a year perhaps in the area concerned. I would like to inform this esteemed House that these aids can be given with the condition that it exceeds three months from the previous flood. If it happens twice in one month, that is beyond my jurisdiction. That means, even if it happens three or four times, if it exceeds three months, the aids will be given. I think we Members of Parliament and also State Assemblymen can inform about this matter, and a decision has been made that in the District Disaster Committee and also the State Disaster Committee, all Members of Parliament and State Assemblymen, regardless of political party, must sit as the District Level Disaster Committee regardless of political party. I have mentioned this three times, Tan Sri. Because the flood issue is not a party issue. The flood issue is not a matter of ideology, but a matter for the people as a whole. And I hope the Honourable Members will take care to participate in the meetings conducted at this district level. And the information I mentioned earlier can be disseminated at our area level. For those who do not relocate...
Okay, one— I want to disturb you for a moment.
For me, for me, let me finish this sentence.
Okay, okay. Thank you. Just a moment.
Be patient, Honourable Member, to win the election once again, you must be a little patient. For those who do not relocate, they must register at PPS. If they do not register and hope for assistance, it is impossible for us to do that. Therefore, I hope this matter can be informed.
Okay. Thank you for the clarification, Honourable. Thank you. I will disseminate this matter. Thank you.
Alright. However, Deputy Prime Minister, I have already used my power to grant an extension of 15 minutes under the Standing Orders. So, there is no option for us to end here. I request, if possible, that the Honourable Member send the other answers in the form of written replies.
Dato' Seri, just one.
Saya...
Satu je.
I am very obedient to, I am very obedient to the instruction of Tan Sri Mr Speaker. With this, I end this winding-up and all the questions from all Members of Parliament who asked, I have asked my officers to provide written answers online, five minutes from now. That is all. Wassalamualaikum warahmatullahi wabarakatuh.
Waalaikumussalam warahmatullahi wabarakatuh.
Layak PM.
The sitting is adjourned and will resume at 2.30 p.m. That is all.
Very steady. Worthy of being PM.
[Dewan riuh]
[The sitting was adjourned at 1.18 p.m.]
[The sitting resumed at 2.30 p.m.]
[The Deputy Speaker [Puan Alice Lau Kiong Yieng] presided
I ask the Honourable Minister of Energy Transition and Water Transformation to respond.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace. Madam Speaker, first of all I humbly extend my utmost gratitude for the Royal Address of His Majesty the Yang di-Pertuan Agong, Sultan Ibrahim, which was delivered on 19 January last, on the occasion of the official opening of the fifth session of the 15th Parliament. The Royal Address not only reflects concern for the well-being of the people, but also serves as a guide and direction for the government and Members of this esteemed House in formulating policies and implementing national development in a fair, balanced and effective manner. I, together with all the people, extend prayers to Allah SWT, that His Majesty be granted long-lasting health and well-being and always be under the protection and mercy of Allah alone. Next, I would like to record my highest thanks for the concern of all Honourable Members who have debated issues under the Ministry of Energy Transition and Water Transformation (PETRA) throughout the Motion of Thanks period and the debate on the Royal Address in this sitting of the Dewan Rakyat. For the information of this esteemed House, a total of 28 Honourable Members have debated 32 issues related to PETRA and also under my portfolio as Deputy Prime Minister. It is noted that the Honourable Member for Rantau Panjang, the Honourable Member for Mersing, the Honourable Member for Bukit Gantang, the Honourable Member for Setiu, the Honourable Member for Saratok, the Honourable Member for Rasah, the Honourable Member for Kulim and the Honourable Member for Shah
Alam have raised issues regarding flood mitigation plans, or in short RTB. In addition, the Honourable Member for Batang Lupar, the Honourable Member for Mersing, the Honourable Member for Setiu, the Honourable Member for Langkawi and the Honourable Member for Saratok have raised issues regarding coastal erosion. The Honourable Member for Permatang Pauh, the Honourable Member for Beaufort, the Honourable Member for Besut, the Honourable Member for Tuaran and the Honourable Member for Klang have raised issues related to river conservation, drainage system maintenance and also short-term mitigation. Meanwhile, the Honourable Member for Saratok raised issues regarding flood forecasting and warning programmes. The Honourable Member for Tuaran, the Honourable Member for Kinabatangan, the Honourable Member for Sik, the Honourable Member for Padang Serai, the Honourable Member for Labuan, the Honourable Member for Bukit Gantang, and the Honourable Member for Machang raised issues related to water supply and non-revenue water, or NRW in short. The Honourable Member for Padang Serai, the Honourable Member for Tumpat, the Honourable Member for Petaling Jaya and the Honourable Member for Kinabatangan raised issues related to electricity supply and sustainable energy. The Honourable Member for Machang raised allegations of money laundering and corruption involving investment transactions worth billions of ringgit linked to IJM Corporation Berhad, or IJM Corp, and also Sunway Berhad. Madam Speaker, allow me to respond and give my views on the issues raised in this debate session based on the main issues. Taking into account that the issues raised by the Honourable Members are quite many and the time given is also limited, I will endeavour to answer all questions as best as I can. Therefore, I seek the patience and indulgence of the House while I discuss the main issues arising from this debate. For specific issues involving projects raised, by locality, Honourable Members may refer to the official PETRA website as early as next week. Insya-Allah I will display the details of the projects, their status and so on. I will only give the general policy in terms of the issues raised.
So, the first issue is floods and drainage. So, Madam Speaker, specific answers to each of the Honourable Members' questions will be provided separately in writing. In this winding-up session, allow me to summarise overall the approach, direction and commitment of the ministry towards the issues raised, namely the flood mitigation plan. Flood mitigation (RTB) projects are a long-term structural solution approach. To address flood incidents, their implementation is phased. A total of 140 RTB projects throughout the country have been approved under the First Rolling Plan (RP1) of the Thirteenth Malaysia Plan, which are currently in the implementation stage. Meanwhile, other projects will be applied for and considered in the next rolling plan, subject to national priorities and fiscal position. In the context of large-scale development, the ministry through JPS refers to the Local Flood Master Plan, or in short PITB, to ensure flood mitigation implementation is aligned with strategic development so as not to increase risks to local communities. PITB identifies flood-risk areas and provides references and actions to be taken to reduce flood risks, involving short-term, medium-term and also long-term proposed solutions. For ongoing projects, the ministry gives attention to close monitoring and appropriate intervention, particularly when involving technical issues, including social impact studies, environmental concerns, safety, land acquisition and utility coordination. Regarding coastal erosion, the ministry through JPS is implementing the Integrated Shoreline Management Plan (ISMP) Study to manage coastal erosion in Malaysia based on three categories, namely: (i) the first category, which is critical with a shoreline recession rate exceeding four metres a year; (ii) the second category, which is significant, with a shoreline recession between one and four metres a year; and (iii) category three, which is not yet serious, with a shoreline recession below one metre. Category one areas, namely critical areas, are prioritised for the implementation of structural measures such as the construction of coastal protection barriers. Meanwhile, for category two and three areas, the approach includes continuous monitoring and development control to reduce long-term risks. Accordingly, projects
coastal erosion control are being implemented through the design-and-build or conventional approach, along with continuous monitoring in areas that do not yet involve physical works. Regarding the project for the construction of a breakwater at Kuala Cenang Jetty, Langkawi. This project is under the supervision of the Malaysian Fisheries Development Authority (LKIM). PETRA will collaborate with LKIM to help resolve the coastal erosion issue in the area, so as to ensure that coastal infrastructure planning takes into account local needs and community views.
In this regard, JPS, as the technical agency, will coordinate and draft technical solutions for the issues concerned. For river rehabilitation and drainage maintenance, the ministry wishes to stress that short-term measures are always carried out continuously to reduce immediate risks to residents, while awaiting the implementation of larger-scale projects. For 2026, the government has allocated a total of RM189.9 million for river conservation projects to reduce flood risks, focusing on river channelling works, bank stabilisation and upgrading of drainage systems to reduce flood risks immediately for residents. The issues of land acquisition and the National Flood Forecasting and Warning Centre (PRABN). The ministry also takes note of the issues of land acquisition and compensation involved in the flood mitigation projects raised. This process is being carried out in accordance with existing legal provisions in cooperation with the state government. PETRA, through JPS, implements the Flood Forecasting and Warning Programme (PRAB) as an early warning system that enables early flood forecasts to be made as early as seven days in advance and flood warnings to be issued as early as two days in advance. The implementation of PRAB in Sarawak is being carried out in Phase 2 and Phase 3.
[Bangun]
And the National Flood Forecasting and Warning Centre (PRABN) disseminates warning information to other agencies and the public through various channels, including the MyPublicInfoBanjir application and the PublicInfoBanjir website.
Honourable Minister?
The ministry wishes to clarify that the issues of floods, coastal erosion and river rehabilitation are addressed through long-term planning, phased implementation and continuous maintenance, with governance improvements from time to time. The government remains committed and ensures that the safety and well-being of the people are given attention at all times. The second issue, water supply and sewerage...
Minister, may I have a moment. On this flood issue, I would like to bring to the attention of the Honourable Minister a constituency issue, because the agencies involved are JPS and TNB. One of the flood mitigation projects in Kampung Ubi in the Tebrau Parliamentary constituency, being carried out by JPS, is now facing a slight technical problem because there is no electricity supply or cooperation from TNB in Johor. Therefore, the water pump cannot be installed. I hope the Minister can provide some assistance on this issue. Thank you, Minister.
Alright. Thank you, Honourable Tebrau. I will ask our officers to go down to investigate and find out how we can resolve the issue. So, the second issue, water supply and sewerage. As the Honourable Member is well aware, in terms of the planning and development of water supply and sewerage infrastructure in the states of Sabah and Sarawak, it falls entirely under the jurisdiction of the state governments. For the state of Sabah, water management is under the responsibility of the Sabah State Water Department (JA Sabah), which carries out its functions in accordance with the provisions of the Sabah Water Supply Enactment 2003. Meanwhile, matters relating to the regulation of water supply are subject to the Water Supply Ordinance 1961. In Sarawak, water supply management is under the Ministry of Utilities and Telecommunications Sarawak (MUT) together with its agencies, namely the Sarawak Rural Water Supply Department and Sarawak Water Sdn. Bhd., and is subject to the Sarawak Ordinance 1994. Nevertheless, in ensuring guaranteed access to continuous water supply for all, the Federal Government has approved an allocation of RM3.38 billion in the form of loans under the Twelfth Malaysia Plan involving the implementation of 18 water projects in the state of Sabah. Sarawak, meanwhile, has been allocated RM1.2 billion involving six projects.
In addition, the Federal Government also provides grant allocations to Sabah and Sarawak of RM349 million and RM243.5 million respectively for the implementation of NRW reduction programmes through critical pipe replacement and holistic NRW solutions. All 24 projects that have been and are being implemented include the construction of new water treatment plants (LRA), upgrading of existing LRA, water resource studies, feasibility studies of water supply projects and maintenance of water supply systems. In an effort to address problems in rural areas, water operators in Sabah and Sarawak may apply for allocations from the Ministry of Rural and Regional Development for the implementation of small-scale water supply projects to ensure that access to clean water supply for rural residents in this district can be improved. Next, the issue relating to the study of the Underground Dam Water Project, or Underground Dam, in Langkawi Island announced in the Budget 2026. At present, this project has completed the study phase by the Independent Checker Engineer (ICE) to ensure the feasibility and physical scope involved. As a result of this study, the ministry, through the Water Supply Department and the National Water Research Institute, is currently examining and refining the study results to determine the direction of this project. Regarding the issue of water supply disruption in the Federal Territory of Labuan, as the Honourable Member is well aware, the Second Meeting of the Labuan Federal Territory Planning Committee Executive Committee No. 1 Year 2023, chaired by the Right Honourable Prime Minister, agreed that a special allocation totalling RM300 million be provided for the immediate maintenance and upgrading of water supply infrastructure in the Federal Territory of Labuan. In this regard, various projects covering the repair of old pipes and mechanical and electrical upgrades have been and are being implemented. 10 projects have been approved at a total overall cost of RM150 million. Four short-term projects at a total cost of RM25 million have been fully completed, while six projects are at the pre-implementation phase, involving four medium-term projects at a cost of RM105 million and two long-term projects at a cost of RM20 million. The remaining project cost of RM150 million under the special allocation is being planned for implementation under the next rolling plan, by the
Labuan Water Supply Department, and the proposals submitted by the Honourable Padang Serai will be considered and coordinated with the Rural Water Supply Department. Regarding the issue of disruption to clean water supply in villages in the Bukit Gantang Parliamentary constituency. For the information of the Honourable Member, the areas that frequently experience water supply disruptions, as mentioned by the Honourable Member, receive supply from the Trong, Larut, Matang and Selama Water Treatment Plants, which are operating beyond their design capacity to meet high demand. The situation is made worse when continuous heavy rain occurs in the Trong River, which is the raw water source for the Trong Water Treatment Plant, which often experiences disruptions due to the intake being blocked by sand accumulation, affecting almost 4,000 user accounts. In fact, cleaning of the intake of the water treatment plant can only be carried out manually. In the short term, the Perak Water Board will carry out the installation of 300-millimetre pipes covering approximately 2.5 kilometres from Simpang Batu 8 Trong to Simpang Changkat Ibol. The installation of this pipe is intended to provide an alternative water supply source from the Air Terjun Taiping Water Treatment Plant in the event of operational disruption at the Trong Water Treatment Plant. This project is expected to be completed by mid-2026. For the long-term solution, the Perak Water Board will build a new plant, namely the Trong 2 Water Treatment Plant with a capacity of 18 million litres per day, using the internal allocation of the Perak Water Board. The construction of this new water treatment plant is expected to be fully completed in 2028 and is currently at the final stage of tender document preparation by the appointed consultant.
Once the Terong Water Treatment Plant Construction Project is completed, the issue of supply disruption caused by water stress, with permission, in the affected areas can be addressed, and it will also be able to meet water supply demand until 2046. The issue of non-revenue water does not arise in Kelantan. For the information of the Honourable Member, the state of Kelantan has received an allocation of RM69.2 million under the Twelfth Malaysia Plan through the National NRW Reduction Programme Approach 1 for the provision of basic NRW measurement facilities. Among the scopes implemented are meter replacement works, volume input system (SIV), with permission, the use of consumer meters, replacement of consumer meters, use of geographical information system (GIS) and also replacement or repair of tanks. These works were completed in 2023. Furthermore, under the Thirteenth Malaysia Plan from 2025 to 2030, PETRA will implement the National NRW Programme Approach 1, Phase 2. With a grant allocation totalling RM2.525 billion for the national level, covering critical pipe replacement across the country and holistic NRW solutions, including in Kelantan. The holistic NRW solutions programme includes, among others, the development of district metering areas, with permission (DMA), active leak detection, pressure control, meter replacement, repair of leaking tanks and the development of hydraulic models. For the state of Kelantan, a total of RM235 million has been allocated for this purpose. At present, this project has completed value management (VA) and value engineering (VE lab) workshops to finalise the technical scope, cost and the most effective and viable implementation method, and is expected to be held in the first quarter of 2026. This project is expected to be tendered in the second quarter of this year. The third issue, electricity supply. Madam Speaker, regarding the electricity supply problem in Labuan. For the information of the Honourable Member, the Federal Government is actively implementing efforts to ensure that residents of the Federal Territory of Labuan obtain a stable electricity supply. As a short-term solution, Sabah Electricity, which is the electricity utility company in Labuan, has implemented the installation of a distribution automation system (DA), with permission, to enable Sabah Electricity's technical team to monitor and manage substations remotely, enabling faster detection and repair of faults and reducing response time. In addition, Sabah Electricity is also upgrading 20 kilometres of underground cables, which were completed as of 27 January 2026. The remaining 19 kilometres will be completed in phases. The upgrading of 37 kilometres of underground cables in urban areas is scheduled to be completed in phases in 2026 and 2027.
(NRW) National Approach 1 for the provision of basic NRW measurement facilities. Among the scope implemented are meter replacement works, the system input volume (SIV), with permission, use of consumer meters, replacement of consumer meters, use of the geographical information system (GIS), and also the replacement or repair of tanks. These works were completed in 2023. Furthermore, under the Thirteenth Malaysia Plan from 2025 to 2030, PETRA will implement the NRW National Approach 1 Programme, Phase 2. With a grant allocation totalling RM2.525 billion for the national level, involving the scope of replacing critical pipes throughout the country and holistic NRW solutions, including in Kelantan. The holistic NRW solution programme covers, among others, the development of district metering areas, with permission (DMA), active leak detection, pressure management, meter replacement, repair of leaking tanks and the development of hydraulic models. For the state of Kelantan, a total of RM235 million has been allocated for this purpose. At present, this project has completed value management (VA) and value engineering (VE lab) workshops to finalise the technical scope, cost and the most effective and viable method of implementation, and is expected to be held in the first quarter of 2026. This project is expected to be tendered in the second quarter of this year. The third issue, electricity supply. Madam Speaker, regarding the electricity supply problem in Labuan. For the information of the Honourable Member, the Federal Government is actively implementing efforts to ensure that residents in the Federal Territory of Labuan obtain a stable electricity supply. As a short-term solution, Sabah Electricity, which is the electricity utility company in Labuan, has implemented the installation of a distribution automation (DA) system, with permission, to enable Sabah Electricity's technical team to remotely monitor and manage substations, enabling faster detection and rectification of faults and reducing response time. In addition, Sabah Electricity is also upgrading underground cables covering 20 kilometres, which were completed as of 27 January 2026. The remaining 19 kilometres will be completed in phases. The upgrading of underground cables in urban areas, covering 37 kilometres, is scheduled to be completed in phases in 2026 and 2027.
For the record, the system average interruption duration index (SAIDI), with permission, in Labuan has been successfully reduced from 96 minutes in 2024 to 82 minutes in 2025. Sabah Electricity targets reducing SAIDI to 50 minutes by 2027. For the long-term solution, the Federal Government has approved the construction of a new 120-megawatt power plant in Rancha-Rancha, Labuan, to replace the Patau-Patau Power Plant, which has been operating for 40 years and will cease operations on 30 December 2027. The groundbreaking ceremony for this new plant was held on 27 January, which I myself carried out. And the plant's operation, or scheduled commission operations (SCOD), with permission, is targeted to commence on 1 January 2028. The fourth issue, renewable energy. Madam Speaker, regarding the issue raised on the large-scale solar installation projects at mosques and solar installations under NEM solar that are very difficult to install at national schools or national secondary schools compared to SJK and SMJK. For the information of the Honourable Member, as of December 2025, a total of 3.38 megawatt hours has been installed at 123 mosques throughout Peninsular Malaysia under the Net Energy Metering (NEM) Programme. Based on the breakdown by state, mosques in Perak have the highest capacity, with a capacity of one megawatt installed at 45 mosques. Meanwhile, the state of Kelantan is among the lowest applicants, with a capacity of 0.1 megawatt installed at three mosques. As for proposals for large-scale solar installation projects at mosques, this matter is subject to the jurisdiction of the state government. Therefore, PETRA would like to call on all mosques to apply for rooftop solar installations under the Solar Rooftop Programme recently launched by the government beginning 1 January 2026, which can provide greater benefits than solar installations for self-consumption, abbreviated as SELCO. In response to questions regarding solar at schools. Solar installation at national schools is subject to the decision of the Ministry of Education Malaysia, which supervises all national schools in this country. In this regard, PETRA welcomes and encourages any institutions, whether mosques, schools or any government institutions, to optimise the use of
rooftops to generate electricity using solar energy and thereby contribute towards the country's energy sustainability.
Request for clarification, Honourable Minister. May I?
Ya, sila.
Thank you, Mr Speaker. I am interested in what the Honourable Minister mentioned about solar installations for mosques and schools, which can also save electricity bill costs. So I would like to know what the conditions are, what size of mosque is required and what the application method is, so that we Members of Parliament can take advantage of this to help mosques and schools that need it?
Schools must go through the Ministry of Education. Mosques must go through the state government because most mosques are owned or managed by the state government. The Solar Rooftop Programme that we are organising now allows them to choose to cooperate with private companies that will invest and install solar, where they will share the savings. The cost will be borne by the developer who installs the solar. That can be arranged and discussed directly with PETRA so that we can provide guidance on installation methods and so on. There are many methods or business models, with permission, that we can plan to encourage installation on the rooftops of buildings and so on. As long as there is a roof, the building can be installed, and the capacity depends on how large the building is. That can be detailed. You may refer to PETRA, and we will provide detailed guidance. Madam Speaker, regarding the proposal that electricity supply in interior areas and remote villages use hybrid solar or individual solar with energy storage systems as a medium- and long-term strategy to ensure continuous electricity supply. For the Honourable Member, this proposal is good. It is hoped that this can be given attention by the Ministry of Rural and Regional Development, which is working to implement the Rural Electricity Supply Programme. The same goes for the state governments. Whether in Sabah or Sarawak, which also plan and develop
the implementation of policies for electricity supply in the state of Sabah, especially where the Sabah State Government is involved. The fifth issue, Permodalan Nasional Berhad. Regarding the allegations of money laundering and corruption, involving investment transactions worth billions of ringgit linked to IJM Corporation Berhad and Sunway Berhad. I feel that the investigation process should be allowed to proceed, so we will not interfere. Let the process proceed by the Malaysian Anti-Corruption Commission (SPRM). However, Madam Speaker, the offer by Sunway Berhad is a voluntary general offer.
This is what, with permission, voluntary general offer, namely an offer made equally to all shareholders of IJM Corporation. This voluntary general offer is not a transaction negotiated with any particular shareholder and is not an offer targeted at TNB or any other institution. In addition, any interested party may submit a competitive alternative offer. As one of the shareholders of IJM, PNB is merely a recipient of the offer in the same position as all other shareholders. Once the offer document is officially issued to all IJM shareholders, PNB will evaluate the offer by taking into account commercial aspects such as the value of the offer compared to the intrinsic value of the investment return and also Sunway's strategic plan after the takeover. PNB will also evaluate other aspects such as offer risks, governance processes and so on. Any decision by PNB whether to accept or reject the offer will be made independently, subject to PNB's governance process and internal approval. The offer from Sunway will only succeed if more than 50 per cent of IJM shareholders accept the offer. As a minority shareholder of IJM with a holding of less than 13.5 per cent, PNB will not be able to influence whether Sunway's offer succeeds or not. This approach is in line with common practice in the capital market, where an open general offer is evaluated individually by each shareholder. So, Madam Speaker, that is all my answer for today, which I have given, to conclude in general terms.
Madam Speaker, may I have a moment?
Please proceed, Honourable Besut.
[Bangun]
Thank you, Honourable Minister. I would like to refer directly to the conservation of the Besut River. I did mention it earlier. However, I would like to know whether, out of the RM180 million allocation, there is roughly any urgent priority for the Besut River? This is because every time there is heavy rain, flooding occurs. And the town, which is along the river, is also suffering erosion. So, if possible, could you take roughly RM20 million and place it there? Can?
[Bangun]
Thank you, Honourable Member for Besut, who is so concerned about his constituency and the people in the Besut area. As I said earlier, under our project application system, it has to go through several processes. First, field studies by the Department of Irrigation and Drainage (JPS), which will then be brought to the state level. The state usually has a priority list. According to those priorities, the state will then submit them to the Federal level. At the Federal level, through the Ministry of Economy and also the ministries, we will determine, from all the lists submitted by the state, which lists become priorities for the state and the Federal government, depending on the allocation that can be financed in that year or in the years thereafter. So, we will take those priorities. And as I said earlier, all the details of the projects that have been approved in the first rolling plan, God willing, next week you can view the list nationwide, which of the approved lists and at what stage of implementation they are, whether at the implementation stage, the design stage, or what stage. We will provide this in general. The detailed information, I will provide to the Honourable Member for Besut later in detail. But I will ask JPS in Besut to give me a special report so that I can see how we can help to resolve this area. But, mostly, our whole country is currently facing the problem of flooding, including in Rantau Panjang, my own constituency as well. But the challenge is how much allocation we can channel to resolve it. That is why I said earlier, priority is determined by the level
of the state, which will be brought to the Federal level, and ultimately we will determine which is given priority based on the allocation that has been provided to us by the Ministry of Economy― the existing ceiling, and that is where we will determine how far we can implement. All these projects are essential, in fact, but priority depends on the money. If there is money, everything is solved. But that is our challenge, because currently we are facing extreme weather. The very heavy rainfall causes flooding. Previously, areas that did not flood, also flooded. But we will arrange the priorities. But at the same time, we must also ensure good water management so that, during the dry season, there is water, so that we can ensure water supply guarantees for our people. Please.
Honourable Minister, Kota Belud.
Honourable Minister. Thank you, Mr Speaker. Earlier I heard that the Deputy Minister was about to finish winding up. I am among those who raised― I represent the voice of EV users in the north. Regarding the problem of EV chargers initiated by Tenaga Nasional Berhad (TNB). Under MGTC, in the north, the target was 400 for 2025. However, until today there are only 97 EV chargers in the state of Kedah. Okay? Secondly, EV chargers initiated by TNB in the south of the country, in Johor for example, can be installed at shopping centres. But in the north there are none yet. So, the government now is encouraging the use of green technology, the use of EVs. But because these chargers are not yet sufficient, not enough, it may embarrass the country while we are moving towards this green technology. I ask for comment on the initiatives of TNB and the Ministry of Energy Transition and Water Transformation (PETRA) on this issue.
[Spoke without using the loudspeaker]
Honourable Member for Kota Belud. I mentioned the mouth of the Abai River, I think several times, and in my debate and because of a meeting with JPS earlier this year, I was informed that the deepening of the mouth of the Abai River has become the number one priority for the JPS Sabah. So, I hope this year, this time, it will be given the highest importance for Kota Belud. Because, if the mouth of the Abai River is left as it is, apart from
flooding, fisheries will also be severely affected. The mouth of the Abai River, Honourable Deputy Prime Minister. Then, the breakwater, I also mentioned in my debate, several times as well, for Pulau Mantanani and also Kampung Pantai Emas. Thank you.
Madam Speaker, I would like to record my thanks to PETRA for allocating such a huge allocation, namely RM316 million, for projects to address flooding and coastal erosion control in Sarawak. However, Honourable Deputy Prime Minister, I would like to request your wisdom so that the project specifically in Tanjung Riong, Maludam, is implemented urgently, because I followed the debate or explanation by you, Honourable, that the area is, if I may say, at a four-metre status, critical first, four metres of that area has already been affected. So, I request that the coastal road in this area is not cut off by erosion, and I once again request the wisdom and graciousness of the Honourable to expedite this project. Thank you.
[Bangun]
[Bangun]
Langkawi.
Thank you, Madam Speaker. Thank you, Honourable. I raised in my debate regarding the jetties in Langkawi under JPS. Most of the jetties in Langkawi are quite dilapidated, Honourable. I refer to the jetty at Kampung Cenang in my debate, where this jetty is also used as a tourist spot. In the evenings, many people come to watch the sunset and so on. But it is very dilapidated, in the sense that one cannot even walk within that area. It is about to collapse, Honourable. And one does not dare. I also mentioned in my debate that― I apologise to these JPS engineers. Because when we speak with village folk, the breakwater or wave breaker was placed in the wrong place, built in the wrong place. These village folk know, Honourable, where the wind comes from and so on. But when this happens, the jetties
collapse. That is why, if possible, it is requested that JPS discuss first with the elders in those villages before building anything at all.
Second, I was interested in the solar, which the Honourable mentioned earlier, and we have a very large hall. And I will try to follow the procedure and ask for help from the Honourable. Thank you, Honourable Member.
Okay, Setiu. I want to raise what I said in my supplementary question regarding the Setiu River Basin Flood Mitigation Plan 1, and the Minister replied the other day that he would give a written answer because the question was specific. And I raise again in my debate speech about this RTB Sungai Setiu 1. I want to know the current status of development, yes. Second, about inviting the Honourable Minister to come to the erosion area at Pengkalan Maras Batu Rakit, because previously it was postponed due to the aeroplane being delayed, according to that record. That is all. Thank you.
Honourable Minister, one more small thing. Yes, one more brief matter. I touched in the debate on the underground water dam project in Langkawi and my concern regarding the environment, which needs to be looked at more carefully. I was informed that there is a study being carried out by UKM and the National Hydraulic Research Institute of Malaysia (NAHRIM) itself. So, I request, if possible, a written answer, to view the project as a whole as one major water transformation process for Kedah itself, including in Langkawi. Thank you.
For Langkawi, I have actually already answered.
Yes, oh, already answered, yes.
The study is complete. Now NAHRIM and JPS are studying the overall results of the study, and they will determine the direction, including looking at social impact, on society and so on.
Good, good. Thank you.
I have answered earlier. The same goes for Langkawi. In fact, the Kuala Cenang Jetty is not implemented by JPS. It is implemented by the Malaysian Fisheries Development Authority (LKIM). I have answered earlier. But I give a commitment, earlier when we discussed, I already asked the GPS
to go down to the field, to meet and see the project for themselves and discuss with the village folk and also discuss with LKIM. How we can help with the technical expertise that the GPS has, so that we can help resolve the problems in the local area, including if there are other jetties and so on. For Kota Belud, please refer to me later, I will display it next week, and we will also prepare written answers for all the projects listed. For Batang Lupar, the erosion project for Sarawak, God willing, the tender process is underway. Once finalised, God willing, this year this project will begin to be implemented. And the detailed specifics, where and so on, can be checked later on our website. And if there is none, then projects that are not there, we will bring them into the second rolling plan. We will apply in the second rolling plan. For EVs, actually, it is not in the debate, but EVs are actually under MITI. Later you can raise it during MITI's answering and winding-up session. I happen to also be the chairman of the National EV Malaysia. And one of our targets is to have 10,000 EV charging stations across the country, including in the north and the whole country, and their installation is carried out by various parties. And some issues that we must clarify, and I myself am well aware that we have not achieved the target we set. And God willing, in the upcoming meeting, I will bring up this issue of how we can accelerate so that we can resolve the EV problems, whether the DC or the EV itself. God willing, I will submit it. So, Mr Speaker— Mr Speaker, thank you to everyone once again for taking part, and our commitment at PETRA is to do our best to ensure the well-being of the people and our economy, which depends on this water and energy, can be fulfilled. Thank you. Assalamualaikum warahmatullahi wabarakatuh.
Thank you, Honourable Deputy Prime Minister. Now I invite the Honourable Minister from the Ministry of National Unity to respond.
Thank you, Mr Speaker. Peace and greetings of Malaysia MADANI unity. Mr Speaker, I represent the Ministry of National Unity, and I give thanks under the patronage of His Majesty the Yang di-Pertuan Agong for the Royal Address which sets the strategic direction of the nation for 2026 and beyond, with emphasis on the well-being of the people, integrity, governance, national security, institutional information, national education and the strengthening of Federal unity. In the context of security, the MADANI Government takes seriously the approach— the reminder of His Majesty regarding modern threats that are increasingly complex, including digital security, information manipulation, misuse of defect technology, serious crime and sensitive 3R issues. In the fields of education and national unity, the government fully upholds the affirmation that the Malay language must remain the main language and also become the language of unity. Meanwhile, Malaysian history must be accepted as a core component of all education systems in line with the National Education Policy. At the same time, Federal unity based on the Malaysia Agreement 1963 (MA63) continues to be made the main basis for nation-building, in order to ensure that Malaysia remains peaceful, united and resilient. Taking into account all these matters, and in line with the Thirteenth Malaysia Plan and under the D1 pillar, this year the Ministry of National Unity will place primary emphasis on efforts to build a sovereign, dignified and resilient nation, to guarantee the peace, cohesion, balance and harmony of the country. I would like to record my thousand thanks to the Honourable Members who took part in the debate on the Royal Address touching on matters under the scope and role of the Ministry of National Unity, namely the Honourable Member for Kepala Batas, the Honourable Member for Tangga Batu, the Honourable Member for Selayang, the Honourable Member for Maran, the Honourable Member for Kapar, the Honourable Member for Bentong and the Honourable Member for Jempol. Mr Speaker, the Honourable Member for Kepala Batas has proposed to the Federal Government that a Tun Abdullah Ahmad Badawi gallery be built in the Kepala Batas Parliament. For the information of the Honourable Member, the Penang State Government has agreed to approve the site at Vision Park, Bertam, Kepala
Batas, to the Ministry of National Unity through the National Archives of Malaysia in June last year. And the application to acquire freehold land at that location has also been submitted to the Director General of the Penang State Lands and Mines Department through the State Secretary of Penang in July 2025. The construction of the Tun Abdullah Ahmad Badawi Memorial will be implemented as soon as the status of the freehold land acquisition is completed. At present, the National Archives of Malaysia together with the Tun Abdullah Ahmad Badawi Legacy Organisation are at the stage of collecting materials related to building the memorial. The total number of materials collected so far is 973 items, covering official documents and archives, personal collections, photographs, audio-visual recordings and research materials. In addition, the National Archives of Malaysia has implemented the Programme to Remember the Statesman Tun Abdullah Ahmad Badawi, Father of Human Capital Development, in September, last year. This effort is part of the government's commitment to appreciate the contributions and legacy of the leadership of Tun Abdullah Ahmad Badawi and to ensure that his contributions continue to be remembered and become a source of inspiration to the younger generation. Mr Speaker, the government greatly appreciates the proposal put forward by the Honourable Member for Tangga Batu to elevate the Baba Nyonya and Chetti communities as icons of national unity. The uniqueness of these two communities not only enriches national identity but also has great potential to serve as a bridge of unity connecting multiracial citizens in this country in terms of language. The Baba Nyonya and Chetti communities are the product of the speech of Baba Malay and Chetti Creole, which shows the beauty of a mixture of mother tongues with local dialects. To ensure this heritage continues to be preserved and remains relevant across generations, the ministry must always work together with these communities and this is also one of the main focuses in strengthening national identity in line with the nation-building agenda.
Sharing of national identity. National identity is an important core in the success of forming a united, resilient and dignified nation. Among the initiatives implemented together is the Rumah KAMI exhibition covering Baba Nyonya and Chetti during the Unity Week celebration, which showcases attire, culinary arts, dance performances and house replicas. Second is the 'Ini Warisan Kita' programme, which aims to preserve and enliven the culture of multiracial communities, enhance identity and foster public acceptance of diversity, while at the same time celebrating togetherness. Returning to the proposal of the Honourable Member for Tangga Batu to elevate this community as an icon of unity, I am pleased to explain the current appointment mechanism. Appointment as a Unity Icon is based on the general guidelines for appointing national unity icons, ambassadors and agents. The National Unity Icon refers to individuals recognised as symbols and representations of unity among society. They are individuals who are respected and known for their contributions in promoting harmony, cooperation and solidarity among various races, between religions and cultures.
Unity Week, which showcases costumes, culinary arts, dance performances and replicas of houses. The second is the 'Ini Warisan Kita' programme, which aims to preserve and vigorously promote the culture of multiracial communities, enhance identity and foster public acceptance of diversity, while at the same time celebrating togetherness. Returning to the proposal of the Honourable Member for Tangga Batu to elevate this community as an icon of unity, I would like to explain the current appointment mechanism. Appointment as a Unity Icon is based on the general guidelines for the appointment of national icons, ambassadors and unity agents. National Unity Icons refer to individuals recognised as symbols and representations of unity among the community. They are individuals who are respected and known for their contributions in promoting harmony, cooperation and solidarity among various races, between religions and cultures.
Menteri.
Several people have already been appointed as Unity Icons. Last year, we appointed eight people such as Goh Sze Fei, men's badminton doubles, Wan Muhammad Arif Shaharuddin, men's badminton doubles and so on. The Honourable Member for Tangga Batu also raised the proposal for the involvement of representatives of the Baba Nyonya and Chetti community committees as members of the National Unity Advisory Council (MPPN). For the information of the Honourable Member, membership of the National Unity Advisory Council is based on the stature, expertise and contribution of members in matters related to unity.
Honourable Minister.
And not subject to racial or religious quotas or ethnic quotas.
Jelutong bangun.
Menteri.
Let me finish first. The Ministry of National Unity welcomes the participation of all Baba Nyonya and Chitty associations or organisations as Friends of Unity in promoting the implementation of unity programmes, particularly those involving the participation of ethnic minorities. At
present, the Persatuan Peranakan Baba Nyonya Malaysia is among the strategic partners that have been registered as Friends of Unity under the Ministry of National Unity. Yes?
Minister, during the debate I also touched on 3R, and while I was finishing my debate, I spoke about, from my own thinking and my own interpretation, someone who is qualified to be appointed as a Unity Icon, namely a nurse from Hospital Besar Seberang Jaya, not Bukit Mertajam. Mr Speaker, I apologise. Hospital Seberang Jaya. A nurse named Nur Deena Nadzhiefa who was seen feeding food with her hand to an Indian patient. I believe she is someone qualified to be appointed as a Unity Icon, and I ask that this matter be considered if possible. Although the government has recognised her sacrifice, nurses will indeed make contributions and sacrifices, but her act of using her own hand to feed food to an Indian patient who is critically ill is something that deserves praise. I have not finished yet, Minister, let me finish. Let me finish first.
Okey.
Compared with individuals such as Cikgu Chandra who have sparked polemics and racial issues. My question, Cikgu Chandra, Firdaus Wong, Ridhuan Tee, Zamri Vinoth, compared with individuals like these, my question is, can Nur Deena Nadzhiefa be appointed as a Unity Icon? One. Second, why, up until now, has no action been taken against Zamri Vinoth, against Cikgu Chandra, against Ridhuan Tee, against individuals such as Firdaus Wong who will organise an Anti Rumah Anutan Haram movement on 7 February at SOGO, Kuala Lumpur. Why? So, I ask. This matter has caused many out there, among the common people, Mr Speaker. All citizens, regardless of Malays, Indians, Chinese, Sabah and Sarawak, are very puzzled: these four individuals can spark violence and cause our country to be in chaos. Why up until now has no action been taken? Thank you, Mr Speaker, for the permission given.
Thank you, Honourable Member. Regarding the icon, I ask the Honourable Member to elaborate on the characteristics of this nurse so that
perhaps they can be included in the characteristics that we should include in the icon. Regarding the issue of several individuals mentioned by the Honourable Member just now, such as Zamri Vinoth and Firdaus Wong and so on, the government indeed takes seriously any form of religious extremism that threatens the harmony of society and the security of the nation. The government wishes to affirm that firm and uncompromising action will be taken against any individual or group that misuses religion to spread hatred, incite division or challenge public order. Although freedom of expression is guaranteed, that right is not absolute and must not be abused to the extent of touching on racial issues, religious issues and issues of the royal institution. The Ministry of National Unity fully supports the police, who work closely with the Attorney General's Chambers, to identify, investigate and prosecute the parties involved in accordance with existing legal provisions, including the Sedition Act, the Penal Code and the Communications and Multimedia Act. The government is also committed to ensuring that social media remains a safe, ethical and responsible platform. No tolerance will be given to any form of extremism, whether in the physical or digital world. Thank you. The Honourable Member for Selayang has proposed that the Ministry of National Unity provide and build spaces for interaction between communities from the aspects of business, community learning and also sports, so that we can build a Malaysian nation that can develop with greater resolve. In relation to this matter, the MADANI Government has taken proactive steps by adopting a whole-of-government approach, namely cross-ministry involvement in providing interaction spaces for local communities. In 2025, last year, the Ministry of National Unity, through the National Unity and National Integration Department (JPNIN), introduced a project to develop social and physical spaces as integration sites in low-cost strata housing within Rukun Tetangga areas. These function as sites for inclusive engagement that encourage interaction among residents from diverse backgrounds, with the aim of achieving sustainable social harmony. To date, a total of 19 social and physical space development projects as integration sites in low-cost strata housing within Rukun
Tetangga areas have been carried out in Pahang, Penang, Perak, Selangor, Negeri Sembilan, Kedah, the Federal Territory of Kuala Lumpur, Melaka, Johor, Sabah, Terengganu, Kelantan and Sarawak. The ministry has also developed five pilot projects using the Progressive Rukun Tetangga fund to build spaces for interaction between communities from the aspects of business, learning, community life and also sports. Examples include the kindergarten project at KRT Penang, the community library project at KRT Gemilang, Pahang, the gazebo project at KRT Jalan Ashby, Perak, the open hall at KRT Serantau in Selangor, and the health fitness community project at KRT Taman Fatimah, Negeri Sembilan. In addition, the Ministry of National Unity has also provided several unity premises to enhance interaction among multi-religious and multi-racial Malaysians. Among them is the unity complex. We have built two unity complexes, and we have 770 Rukun Tetangga centres.
We have held 13 unity activity centres, nine community mediation centres, 506 village libraries, four community libraries and also we have eight digital kitchens. Among the initiatives of other ministries and agencies, we have the National Information Dissemination Centre (NADI), and currently we already have 154 NADI centres throughout the country. Is that right, Honourable Member? It is under MCMC. We also have the Rakan Muda Complex under the Ministry of Youth and Sports. We also have creativity spaces under MOSTI. We also have senior citizen activity centres under the Ministry of Women.
Menteri. Menteri?
Ya.
Regarding the community matter just now, community libraries and community activity centres, if possible I invite the ministry to look at the village library in Kampung Sementa, because Kapar has 60 per cent non-Malays, non-Muslims out of 320,000 residents. So, I think this library is good as a unity centre that can be used by KRT and so on. Second, Minister, as I mentioned in my debate on this, I think the ministry should look professionally at where the national identity or Malaysian identity, the Malaysian nation, lies. The meaning of the use of the language, as the Minister mentioned, Bahasa Melayu as the national language, wherever you go from Perlis
to Sabah, just look at tourists coming to whatever, the young pelapis students, just look, this is Malaysia. So, I am rather worried when we look abroad, they use their mother tongue, their national language. So, I want us to look at Malaysia. Does the Minister agree to start a movement towards that? Only then will the Malaysian identity be seen.
Thank you. Honourable Member, in my answer just now, indeed libraries are one of the unity premises or unity centres. We already have 506 village libraries as unity premises and also four community libraries. Perhaps the one mentioned.
For Kampung Sementa, is it?
Included in this list. From what is called Malaysian identity, this is our effort this year under nation-building, and we hope we can achieve our aim to strive in holding our agenda and activities under the nation-building programme. I did mention that Honourable Member, and one of them is our own identity, or Malaysian identity.
Sorry, perhaps I was not clear. What I mean is signboards, any names, there are languages, various languages including English and so on. I got no about that lah, you know. But let the Malay language be clear and big. Thank you.
Yes, Honourable Member, I take note. Yes. The Honourable Member for Betong raised the current status of the patriotism study among civil servants being conducted by the Ministry of National Unity. The Ministry of National Unity has now issued the Circular on the Cultivation of Patriotism and Loyalty Practices among Civil Servants on 17 March 2025. This aims to strengthen and nurture the spirit of patriotism in the hearts of civil servants. There are eight elements emphasised in the circular for instilling the cultivation of patriotic practices among civil servants as follows: (i) in terms of history; (ii) the Federal Constitution and the Rukun Negara; (iii) national identity; (iv) practising Malaysian culture;
(v) maintaining harmony in diversity; (vi) strengthening mass media wisely; (vii) use of latest technology; and (viii) pride in local products. Following that, the ministry carried out an online survey in mid-2025 involving more than 200,000 respondents to assess the level of patriotism among civil servants. For the information of the Honourable Member, this study on patriotism among civil servants has been approved by the Ministry of Economy through the RMK13 allocation under the first rolling plan this year, in line with the aim of the public service reform agenda under the internalisation of values and governance. The ministry is holding discussions with the Public Service Department and the Department of Statistics Malaysia to finalise the reference theme of the study before the pilot study is fully implemented. Apart from these studies, the ministry has also implemented various other research programmes involving the level of unity, looking at the level of unity among Malaysians such as IPNas, the National Unity Index study, the Community Tension Study (IKM), and the Study on the Development of a Social Cohesion Model for Sabah and Sarawak. Regarding the proposal to expand this study to public higher education institutions, several studies have already been carried out separately by IPTs, among them a social cohesion study by Universiti Pendidikan Sultan Idris (UPSI) which examines patterns of social cohesion among Malay, Chinese and Indian students. Second, a study on race relations at Universiti Utara Malaysia which assesses the climate of interaction between races, the level of comfort and students' perceptions of race relations on campus. Third, there is also a study on university students' perceptions of the level of national unity conducted by Prof. Madya Dr. Bahaman Abu Samah. The Honourable Member for Bentong also asked about the government's efforts to bring back Malaysian historical materials held overseas. The Ministry of National Unity, through its departments under it, namely the Department of Museums, the National Archives Department and the National Library of Malaysia, is always committed to bringing back Malaysian historical materials held overseas since 1965.
This effort is carried out through tracing, research and purchasing activities in the form of physical copies, microfilm and digital copies from various countries including the United Kingdom, the Netherlands, Portugal, Italy, France, India and so on. Through the National Archives, Malaysia has now acquired more than 16,000 physical items and 1.2 million digital items in image form from overseas. Last November, the National Archives of Malaysia also successfully purchased a digital collection of the Colonial Office, covering from 1759 to 1967, involving a total of 8,507 files with 1.3 imej. This collection has begun to be made available for access by Malaysians starting January this year. This year too, the National Archives of Malaysia has been allocated funds under the initiative for the preservation and restoration of the nation's heritage treasures to trace and acquire archival materials from within and outside the country. Several countries have been identified for the implementation of tracing and research activities on Malaysian historical materials. Among them are the USA, Russia, the Netherlands, Spain, Norway, Turkey and many more. Meanwhile, the Department of Museums has implemented a phased mission to restore historical objects starting in 2025. This restoration method is implemented based on evidence of the rightful owner or on the basis of diplomatic ownership, in cooperation with the Ministry of Foreign Affairs and Malaysian representatives overseas, with an estimated total cost of RM6 million. In addition, the National Library of Malaysia has also successfully traced and acquired 790 copies of Malay manuscripts from 27 storage institutions overseas. Among them are the British Library, as well as in Paris, in the Netherlands, as well as Cambridge University. In 2026, RM500,000 has been approved by the government for the National Library of Malaysia under the initiative for the preservation and conservation of the nation's heritage treasures to carry out a project to trace Malay manuscripts in two countries, the Netherlands and Russia.
In answer to the Honourable Member for Betong regarding the initiative on the status of memorials for leaders and statesmen. I would like to announce that the Ministry of National Unity, through the National Archives of Malaysia, is always committed to bringing memorial galleries and libraries closer to the public, especially the younger generation.
So far, we have 11 archival memorials throughout the country, such as the Tunku Abdul Rahman Memorial in Kuala Lumpur, the Declaration of Independence Memorial in Melaka, the Tun Abdul Razak Memorial in Kuala Lumpur, the Tun Hussein Onn Memorial, the Statesmen Memorial, Galeri Seri Perdana and so on. To revive memorials and manifest the delegation of statesmen, the ministry has driven an initiative to bring the national archives closer to the people through the National Archives of Malaysia. Among the initiatives we have implemented are the e-Negarawan platform, the Majlis Memperingati Legasi Negarawan (Statesmen Legacy Commemoration Council), interactive exhibitions at shopping centres, and guided tours for students to the National Archives of Malaysia. Honourable Member for Maran also raised the issue regarding the role and operations of the National Historians Council as the main reference body in determining the standards of content...
Menteri.
...And the direction of the nation's history.
Menteri.
For the information of the Honourable Member...
Minister, before the Minister concludes, I appreciate the response from the Minister and I see that the Right Honourable Minister is truly— earnest in the issue of unity. From time to time I can see this earnestness standing out when we see these news reports published in Malaysiakini, where the Minister emphasises the factor that we need to nurture unity. Following on from the answer given just now, may I obtain an assurance from the government that we will ensure unity is preserved? The gathering to be held this Saturday, the 7th of the month, at SOGO, namely the Anti Rumah Anutan gathering, will either be cancelled or will not be given any approval by the government. So that we can ensure that no party can spark a situation of racial tension.
Thank you, Honourable Member. I have answered earlier. Thank you. That is being repeated once more.
Ya.
I have answered, and that is the ministry's answer.
However, I want to get a commitment. Will this Anti Rumah Anutan Haram gathering be permitted by the government or not?
Yes, I have already answered that just now. That depends on the ministry or agency that can curb such activities, namely the Ministry of Home Affairs (KDN) and the Royal Malaysia Police (PDRM). Thank you. I am referring to— the answer to Maran, who touched on the National Historians Council. The National Historians Council was established on 9 September, chaired by the Right Honourable Prime Minister himself, and we at the National Archives serve as the secretariat. Seventeen members have been appointed for a period of— for a period of two years. This includes 10 historians; two archaeologists, two anthropologists and sociologists, and two representatives from the ministry.
The Right Honourable Minister.
This council aims to regulate the study, advocacy writing and education of history, and to strengthen the national narrative and reinforce national identity, with the main functions as follows. To regulate history to ensure that the study of sources and the writing of history are accurate, authentic and evidence-based. Also for the national narrative, to strengthen a historical narrative that unites multiple races and educates the younger generation.
The Honourable Minister.
Also as a professional platform. Can I finish this one first? Also as a professional platform.
May I ask about the History Council, Honourable Member?
It becomes a platform for historians, archaeologists, anthropologists and so on. It also becomes the empowerment of heritage to preserve heritage and history so that they remain relevant and sustainable.
Thank you, Honourable Member. A small question about the National History Council just now. What are the qualifications of the Right Honourable Prime Minister to be Chairman of that council, because it is feared that there is a possibility to
modify history according to current political preferences. I am not speaking only about the present Prime Minister, but future ones too. And second, Honourable Minister, just now I wanted to go back a little regarding the statesmen's archive. 8 February is the upcoming date of the birth of the late Tunku Abdul Rahman Putra. So, what plans does the government have to commemorate that birthday?
Thank you, Honourable Member. The chairmanship of the History Council, the National Historians Council, is at the prerogative of the Prime Minister himself, and he is the Chairman in— Because I see that he takes it seriously. That is why this National Historians Council was established following his own directive, and we under the Archives serve as the secretariat. Second, regarding...
Honourable Member, I apologise. I understand— many people are concerned about the nation's history. But what are the qualifications for being among the evaluators and chairing meetings to evaluate this nation's history?
Yes, that— As I said just now, that is the Prime Minister's own prerogative. But the members— the 17 Members are the genuine personalities whom he brought in to become members or to serve on the council. I recall that I also saw that all of these personalities are indeed veterans, and I think that as chairman, perhaps it relates to their interest in being brought in as members, and I too as...
The Honourable Minister.
Sekretariat sahaja.
The Honourable Minister.
Mana ini?
Time is up. Honourable Minister, here. Time is up.
Oh sorry, I remember. Sorry. A little more. One page. Can? Two minutes, three minutes. All right. Okay Honourable Member, what else? The event we are holding for 8 February is that we will hold a grand-scale event at that time. We will hold—
from morning until night. The night event commemorates the late Tunku Abdul Rahman, yes. On the night we will hold it and I will attend at that time. To— Jempol, asking about the government's efforts in nurturing the spirit of unity. For the Honourable Member's information, the main role of the ministry is to create an ecosystem of unity, a unity platform and integration sites that can enhance social interaction and unity among the multiracial people. This effort is implemented in line with the Federal Constitution, the Rukun Negara and the National Unity Policy. The Ministry of National Unity has developed the National Unity Policy since 2021 to strengthen national unity and integration. We have also held the Unity Action Plan and various programmes have been implemented. The programmes are strategic and integrated, involving government agencies and a whole-of-government approach. The Malaysia MADANI Unity Framework has been developed as a strategic initiative driven by the Ministry of National Unity in an effort to lay the foundation of National Unity through a holistic approach that cuts across various sectors. In 2025, 762 programmes covering festivals, celebrations, national programmes, volunteerism, community development, identity campaigns, and many more programmes that attract public interest in the nation's heritage treasures. This year, 2026, the ministry emphasises focus on nation-building as a new strategic effort in strengthening the relationship among Malaysians in line with the commitment of the Thirteenth Malaysia Plan. Nation-building is very important for Malaysia today because it becomes the foundation of peace, unity, stability and harmony of a plural nation. In the increasingly challenging global reality, ideological differences, the influence of social media, identity politics and the pressures of globalisation, nation-building plays a role in uniting the people under it through sharing a national identity without denying the diversity of race, religion and culture. This year the ministry will carry the theme "Bersama Membina Negara Bangsa". That is all, Mr Speaker. Thank you.
Thank you, Honourable Minister of National Unity. Now I invite the Honourable Minister from the Ministry of Communications to respond.
Now I invite the Honourable Minister from the Ministry of Communications to respond.
Thank you, Madam Speaker. First, I take this opportunity to express my gratitude for the Royal Address of His Majesty the Yang di-Pertuan Agong. I also pray that Allah SWT always ensures that His Majesty always remains under the protection and mercy of Allah SWT. Next, I extend my thanks to the 23 concerned Honourable Members who took part in giving views or raising questions touching on the scope of duties of the Ministry of Communications, as follows: (i) online safety; (ii) freedom of expression and media freedom; and (iii) digital infrastructure. Honourable Member for Merbok, Rantau Panjang, are you here? Rantau Panjang is here. Kuala Terengganu, Balik Pulau, Bukit Bendera, Setiu, Pekan. Each touched on the misuse of artificial intelligence or AI and especially deepfakes, with permission. The issue of the misuse of artificial intelligence or Artificial Intelligence (AI) falls under the jurisdiction of the ministry or the relevant enforcement agency, depending on the nature of the offence. If the misuse is for the purpose of producing harmful content, action may be taken under the Online Safety Act 2025 [Act 866] or the Communications and Multimedia Act 1998 [Act 588], both of which are enforced by the Malaysian Communications and Multimedia Commission or MCMC. Efforts to address the issues of AI misuse require a collaborative approach between the government— between government agencies. MCMC's involvement in this covers technical assistance regarding the provision of information (profiling), with permission, and digital forensic analysis to facilitate investigations by the authorities. The dissemination of various forms of risky content online, including false information, fraud, misuse of online services, elements
of provocation and security threats, is an issue that requires serious attention. With the rapid development of content generated by AI technology, it has accelerated the creation and dissemination of manipulative content and increased the potential for spreading information that can mislead users and threaten public harmony. In this regard, MCMC takes proactive action to monitor issues discussed on social media in our country, including those involving public interest, crime, abuse, threats and provocation. Cooperation with social media platforms and other enforcement agencies is also actively carried out to address the spread of false information, including fake content generated through AI. From 1 January 2022 to 15 January 2026, MCMC has submitted a total of 5,409 requests to service providers for the takedown of image forgery content and, recently, deepfake technology. Of that total, 4,955, or 92 per cent of the content, has been taken down. For fake content, 59,967 requests have been submitted, with 51,912, equivalent to 87 per cent of the content, taken down. All these takedown actions are made based on complaints received and the community guidelines set by each platform and the local laws in force. In line with the amendment to section 233(1) of Act 588, fake content disseminated with the intent to commit fraud, with permission, or deception against any person is an offence punishable with a fine not exceeding RM500,000 or imprisonment not exceeding two years or both, and a further fine of RM5,000 a day for every day the offence continues after conviction. The government has also enacted Act 866, which requires licensed application service providers and content application service providers to regulate harmful content. This Act came into force on 1 January 2026 together with several related subsidiary legislations. MCMC is currently completing other subsidiary instruments under Act 866 to elaborate on the responsibilities of licensed service providers in managing online risks effectively. Public consultations are often held to obtain feedback from stakeholders and interested parties, in line with the principles of transparent and inclusive governance.
In these subsidiary instruments, among the matters being considered is the proposal to implement content labelling, especially content generated or manipulated using AI such as deepfakes, image manipulation and voice manipulation. This approach aims to help users identify content that is potentially misleading, manipulative or unauthentic, in line with efforts to reduce the risk of spreading inaccurate information or harmful content on online platforms. Since the enforcement of Act 866 on 1 January 2026 until 15 January 2026, there have been two requests for the takedown of offensive content submitted to service providers, and both contents have been taken down. Act 588 and Act 866 provide a regulatory framework to address the spread of harmful content online, including content generated through AI applications such as Grok. The government through MCMC will continuously monitor online harms, including content generated through AI applications, so that they do not breach the law and the moral values of Malaysian society. Honourable Member for Permatang Pauh asked about the government's measures to block applications that spread deviant behaviour and obscene advertisements online. Permatang Pauh, are you here? Not here? If not, I will reply in writing. Just one reminder to all Honourable Members. When we visit any, with permission, website, web page, advertisements will be displayed and these advertisements usually read our algorithm. That means, based on cookies and several other methods, they will know what we are interested in. If Madam Speaker likes cats, when we browse any web page, it will usually show cat advertisements. So, if the Honourable Member for Pematang Pauh frequently sees certain advertisements, perhaps we need to clean up the Honourable Member's algorithm. Right, so we need to monitor because every website has— this is for the information of all Honourable Members, indeed when we visit any website, they will install what is known as cookies to see what we like, what we dislike. So, please be careful in this matter. Right, so I will answer the Honourable Member for Permatang Pauh in writing later. Gopeng, is Gopeng here? Not here? So, I will also answer in writing. Only there is a question, this one may be for the information of the House, regarding business promotion on e-commerce platforms. So for everyone's information, guidelines and business promotion activities by traders are subject to
policies under the Ministry of Domestic Trade and Cost of Living or KPDN. Digital business activities such as e-commerce are regulated by KPDN. The Ministry of Communications through MCMC provides cooperation in terms of technical assistance, including requests for takedown of content on social media platforms, requests for website blocking, provision of information (profiling) and digital forensic analysis to expedite investigation processes and enforcement actions against online fraud cases. Now, MCMC is also working together with and providing necessary inputs to KPDN to improve the existing regulatory framework for e-commerce platforms. In dealing with content that violates the law, from 1 January 2022 to 15 January 2026, MCMC has submitted 12,570 requests to service providers to take down content related to advertisements or products or services that are not permitted. Of that total, 10,480, or 83 per cent of the content, has been taken down. Of these, most of the requests came from various agencies including the Ministry of Health, sometimes involving products that are not permitted, possibly containing prohibited drugs and so on. Honourable Member for Seputeh. Not here? But I will touch on what she raised. She asked about the results of MCMC and PDRM investigations regarding false posts about her on social media. This is something for the information of Honourable Members, a very improper matter where someone accused the Honourable Member for Seputeh of having issued a statement saying halal certification is needed for the sale of pork. So, MCMC has received a First Information Report (FIR) regarding the dissemination of fake content involving headlines and statements linking the Honourable Member for Seputeh with the allegation I mentioned just now involving the issue of halal certification.
[Deputy Speaker (Dato' Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting] At this time, all suspects have been traced, identified and their statements recorded. Accordingly, eight investigation papers have been opened and investigations are being conducted under section 233(1)(a) of Act 588, and two are awaiting the results of forensic reports, while four have been referred to the Attorney General's Chambers, and the remaining two will be referred in the near future
for follow-up action. MCMC has been informed that the Royal Malaysia Police is also investigating the matter and MCMC will provide necessary cooperation and assistance to PDRM. Dato' Yang di-Pertua, is the Honourable Member for Tampin here? Not here. Padang Rengas? Not here. Rasah? Also not here. Right. So, I will answer all three Honourable Members in writing. But there is one matter that may be for the information of the House. The Honourable Member for Rasah raised the issue of MCMC's action against Sin Chew Daily and Sinar Harian and asked whether this issue has been referred to the Malaysian Media Council and the status of appeals by both media. For the information of Honourable Members, the Malaysian Media Council was established through the Malaysian Media Council Act 2025 [Act 868] and has been mandated to set and develop ethical and responsible journalistic standards, including drafting codes of governance for mainstream and independent media practitioners. This role also covers monitoring and adapting to the use of new technologies in journalistic practice. The Media Council promotes media education and news literacy to increase public awareness of the importance of accurate, ethical information free from elements of hatred. In addition, the Media Council also plays a role as a platform for dialogue between media practitioners and society, not only to strengthen two-way communication but also to reduce misunderstandings and tensions that could potentially trigger hate speech among the public. MCMC's decision to impose a fine on Sin Chew Daily and also on Sinar Harian was based on investigations under section 233(1)(a) of Act 588 and at that time, the Media Council had not begun operating officially. However, action can still be taken and now, we are trying to bring the issues faced to the Media Council for consideration. For information, Sin Chew Daily and Sinar Harian have submitted appeal applications against the compound imposed by MCMC. Every appeal submitted will be considered with permission, on a case-by-case basis and depending on the facts of each case. After consideration of all relevant matters in the appeal, the compound amount has been reduced for the companies based on the provisions under Regulation 4 of the Communications and Multimedia (Compounding of Offences) Regulations 2001.
Both newspaper companies have settled the reduced compound payment in full; it has been fully paid. The Media Council will always hold constructive dialogue with MCMC and the Ministry of Home Affairs to develop clearer guidelines and a transparent and collaborative framework in addressing issues relating to accuracy, and the preparation of article and report content. The main objective of providing guidelines is to protect the integrity of journalism and the public's right to information while giving room for the media to grow, adapt and innovate. I believe the Media Council remains committed to working with all stakeholders to uphold responsible journalism and defend media freedom as an important pillar of Malaysian democracy. Dato' Yang di-Pertua, the Honourable Members for Sipitang, Puncak Borneo, Batang Sadong, Selangau, Batang Lupar, Lawas, Kulim-Bandar Baharu, Mersing, Kuala Krau and Ipoh Timor touched on the issue of digital infrastructure, especially in interior and rural areas. The government fully understands the importance of good Internet access not only for education and the economy, but also to provide opportunities and hope for the people across the country, especially in villages, kampung and interior areas. The government through MCMC remains committed to efforts to strengthen the nation's digital infrastructure to ensure wider and more inclusive access can be enjoyed by all Malaysians through the implementation of the National Digital Network Plan or JENDELA. As of 31 December 2025, the national Internet and communications coverage rate for populated areas has reached a composite figure of 99.71 per cent, compared with 91.8 per cent before the implementation of the JENDELA initiative.
Minister. Kuala Krau.
Baik, sila.
Thank you for touching on Kuala Krau earlier. I just want certainty on the period between the complaints we make about the weak connectivity, how much time is needed for action to be taken by the ministry? Thank you.
Thank you, Honourable Member. It depends on the issue faced. Sometimes there is interference with existing transmission towers, existing telecommunication towers. If that is the problem and it can be resolved, it is called optimisation or sometimes there is
equipment that is not functioning and needs to be replaced. These involve aspects that can be resolved fairly quickly. If the area has no connectivity at all, then the process of building a new tower will depend on several factors and sometimes takes up to 24 months because it involves approval at the level of local authorities (PBT) and sometimes the network that needs to be built to ensure Internet speed. So, there is a tower but no fibre, that is also an issue. So, what the ministry, especially MCMC, is now evaluating to implement is interim solutions that sometimes involve applications or the use of technologies such as Starlink. Starlink can provide Internet but not, with permission, voice. But voice over WiFi can be used. So, there are several technologies being studied. But the intention is, if an area's population is sufficiently large, it is better to have a tower. Whether a monopole of 30 metres, 60 metres or 76 metres, so that a larger population can be provided with the intended telecommunication services. Sometimes it is quick, if the problem involves existing structures or the period is rather long if a new structure has to be built. Thank you, Honourable Member. Puncak...
Honourable Minister, Puncak Borneo would like a little clarification. Thank you, Honourable Minister. During my debate I raised that the quality of internet coverage in Puncak Borneo is getting worse, even though it has reached—it is said to have reached 90 per cent. But the reality underneath is that it is deteriorating, and I have experienced it myself. Previously, I used DiGi, but after the merger of DiGi and Celcom, the line at my own Pusat Khidmat office is also very bad, with only one or two bars. Sometimes there is none at all, and most areas face the same problem. I have also been in contact with MCMC Sarawak. What was conveyed was that it is caused by vandalism and also sometimes by blackouts of the generated electricity. And, with permission, all this is actually a known problem. So, I hope the MCMC has looked into this matter, which has recurred for years. So, I hope this problem has a solution. Because vandalism was once answered by the Honourable Minister, saying that
there was once a tower with 27 intrusions into that tower. So, this matter has recurred for a long time and I hope there is a solution. Secondly, I also thank the Honourable Minister for installing Starlink at Kampung Nyegol and also at Kampung Muk Ayun. The people are very happy with that kind of connection, very stable, the speed is very good.
However, if possible, I also request that the Starlink service be extended to places that are out of grid in the Puncak Borneo Parliamentary constituency and, if possible, to areas throughout the state of Sarawak. Thank you.
Thank you, Honourable Member. I have also done my homework, so this is a map for the Puncak Borneo Parliamentary constituency. [Showing a sheet of paper] In 2024, the composite CoPA for 4G. This composite means that when we combine all the towers at that time in 2024, CoPA in Puncak Borneo was only 90.64 per cent, and by the end of 2025 it had reached 99.22 per cent. However, it is true, what the Honourable Member means: if a person uses one line, it is not necessarily the case that they will get service in every place within one area. So I am pleased to inform you that, when we examine up to the fourth quarter of 2025 in Puncak Borneo, of the six telecommunications companies that we monitor, the lowest coverage was 10.69 per cent, 10.69 per cent, and the highest was 99.22 per cent. And what the Honourable Member mentioned earlier, that company has 90.76 per cent. So I would not suggest—this is not a pitch to sell any telco company—but sometimes we see that telcos, they are not—they should provide the same coverage for any area. That is why, on the part of the ministry, what we are working on is the policy...
[Bangun]
Honourable Minister, if I may interject briefly. If possible, we must also set KPIs for these service providers. Because customers still pay, but their quality of service, coverage and so on are very disappointing. So, there must be a mechanism for us, not to punish them, but so that we ensure these service providers
deliver quality services to the public. That, if there is, we must emphasise and implement. Thank you.
Yes, indeed we— Honourable Member, I was just about to mention that we have a policy where there is internet along the roads, and I have also asked for efforts to be made, with permission, on network sharing among telco companies. In May 2024, we succeeded in starting the process to enable telecommunications companies to use each other's passive infrastructure, with permission, based on commercial understandings between them. The MCMC has also issued a number of commission directives that certain telco companies must ensure that the gap between what is called the composite CoPA for a Parliament and what is actually provided by the company is overcome immediately. I do not have figures specifically for the Puncak Borneo Parliamentary constituency, but indeed we have imposed fines and compounds on companies that defaulted. Some of these companies asked for time to overcome the problem, but I have asked that, in general, it must not be delayed and must be done immediately. But I also thank you before I allow you to proceed.
Sibu here. I want to raise two matters. In urban Sibu, internet speeds are also getting worse in urban areas. I think it is not a coverage problem but a saturation problem. Most telco towers are already saturated; they do not have enough capacity. Secondly, I have lodged complaints with the MCMC, and they came to the areas where I lodged complaints to check internet speeds. And the minimum speed requirement considered to pass is 30 megabytes per second. 30 megabytes per second, I think this standard is far too low. Nowadays internet speeds are already 100 megabytes, 300 megabytes. But the requirement for minimum speed is 30 megabytes. I think this minimum speed should be increased.
[Bangun]
Previously, Honourable Member, the minimum speed was lower, two and a half Mbps. At one time, it was about three Mbps at that time. But we have slowly, with permission, been increasing it little by little. And some telco companies asked us not to be too
stringent on this issue, but I take a very pro-people view. So I have asked that if there is a figure that is too low, we cannot accept it and we ask that action be taken. I will ask the MCMC to present to me what problems are faced in the Sibu Parliamentary constituency, God willing I will try to visit the Sibu Parliamentary constituency and then I want to go and visit several places to see the internet problems. So, before I go to Langkawi, for the information of Puncak Borneo, I have also asked that the issues raised, I have looked at them from last May until 3 February; the Honourable Member has held about seven engagement sessions with the MCMC. God willing, I will ask that the problems faced, including in-building coverage at these service centres, be resolved thoroughly and comprehensively.
Thank you, Honourable Minister. Thank you.
Langkawi.
Thank you, Dato' Yang di-Pertua. Thank you, Honourable Minister. I raised the coverage issue in my debate concerning the Kuala Teriang Langkawi fishing jetty. Where fishermen, as soon as they go out, roughly more than 500 metres, they have no coverage. Moreover, Thai operators come into their phones, and the charges they have to pay are quite high. So, because there is no coverage, we feel the issue is the frequency disc that does not reach there. And I have already asked the telecommunications operator companies to help, but until now there has been no help. And the problem these people face is that they cannot communicate with their base at the jetty. And sometimes they come across refugees who enter there, and they cannot contact government agencies regarding refugees. So, this is a problem that is occurring. So I ask for the Honourable Minister's assistance in this matter. Thank you.
A brief clarification on the same issue, almost the same. Thank you, Mr Speaker. The issue that arises in my area is interference from transmitters from Thailand. So I think this occurs everywhere, almost all borders, where when we are at the border, more so— if our clocks change
to Thai time, we, we become very weak. And what arises is especially during the flood season. So, before this, I have made many complaints, mainly to the MCMC, relating to this coverage issue, especially when floods occur and major floods happen, where telecommunications are very important for safety reports from the rescue programme. So when electricity is cut off because of floods, then the line is also gone. So this is very, very risky. So, I want to know the long-term solution so that high-risk areas, especially those involved with disaster risks, are given priority, have high coverage, so that they can overcome the issues that will arise if a disaster occurs. Request for clarification.
Thank you, Honourable Member for Rantau Panjang and Honourable Member for Langkawi. I take note of the problem. Indeed, we do not only face this issue in Rantau Panjang and Langkawi regarding spillover, with permission, of signals from neighbouring countries. In fact, I have directed the MCMC to hold discussions with counterpart entities in Thailand called the NBTC, and also in Singapore and in Indonesia for Sebatik Island in certain areas, the Tawau area. And there are several matters that need to be harmonised between the two; on our side we actually comply with several matters, but there may be some foreign companies that may need some engagement by the NBTC on their side.
The last time this meeting was held was a few months ago, but I will ask that the problems faced, this spillover that occurs, be managed better. At the same time, as a user, I also want to ensure that users know and are aware that if we activate auto-roaming and when we reach some places at the border, it will latch onto the signal from the neighbouring country. So, we must deactivate auto-roaming in the handset or each device to avoid that from happening. It is because the device will latch onto the nearest signal. So, the strongest signal. So, that is what causes changes in signal or which telco company provides service to us at each location. But I take note.
Regarding the flood problem. Indeed, previously, the MCMC has directed that all telecommunications companies that have tower structures, especially in Kelantan, Terengganu and several states that often face flood problems, carry out site hardening. It involves raising several structures, including electricity supply and radio equipment that may previously have been at ground level but have been raised to a level considered to be frequently flooded. This is not only in the Rantau Panjang area or in several states, but has been initiated throughout the country. Only the issue of electricity supply involves an agency that is not under the purview of the Ministry of Communications. I have asked that when we visit the areas affected by floods last year, indeed the problem is not merely electricity supply being cut off but also fibre optic cables being severed. It was a major flood at that time. So, there are sometimes problems that we have to deal with by installing stalling devices, for example, to restore some facilities. But God willing, I will ask that, in conjunction with the Preparedness Month in October this year, some preparations be expedited to ensure that when floods happen, we do not lose connection. So, this is what we will follow up on later, Honourable Member, God willing. In the last six minutes, I want to touch on perhaps what was raised by several other Honourable Members. Sipitang, none? None, is it? Alright.
[Speaking without using the microphone] None.
Ha?
None from Sipitang.
None from Sipitang. Alright. In that case, Ipoh Timor, none? Alright. For the other Honourable Members who raised issues that I did not answer, I will prepare written replies. Thank you, Dato' Yang di-Pertua.
Thank you, Honourable Minister. Next, the House proceeds to the next ministry. I invite the Minister of the Ministry of Housing and Local Government (KPKT) to speak.
Peace and greetings of unity, Mr Speaker and Honourable Members
whom I hold in high regard. I begin the winding-up of the Royal Address with a verse. The drum is beaten to open the custom, the sovereign King is the umbrella of the nation; KPKT firmly upholds its mandate for the people, prosperous and well-being. Mr Speaker, with a deep sense of humility and modesty, Teluk Intan respectfully expresses gratitude and seeks to wind up on the Royal Address of His Majesty Seri Paduka Baginda Yang di-Pertuan Agong on the occasion of the Opening of the Fifth Session of the Fifteenth Parliament. As a brief overview, His Majesty, in the Royal Address, expressed congratulations to the MADANI Government on the country's economic growth performance, which is very commendable overall. In line with the commencement of the Thirteenth Malaysia Plan (Rancangan Malaysia Ke-13), His Majesty also emphasised efficient government governance in ensuring that the momentum of economic growth can bring the spillover of prosperity and well-being for all Malaysians to enjoy, including the continuous provision of affordable housing to every citizen and the enhancement of basic infrastructure. His Majesty also stressed that the effectiveness of every national plan depends entirely on thoroughly eradicating the effects of corruption, and corrupt behaviour must be fought relentlessly. Indeed, His Majesty's Titah, which gave a stern warning and is in line with the MADANI Malaysia aspiration, must be given serious attention by this august House. In addition, His Majesty's reminder that every debate, decision and also vote made in this House is not merely the stance of a political party, but it becomes the determinant of the nation's future. It should be the lifeblood of this august House and also of myself, that the responsibility of a Member of Parliament is far greater in importance— far greater than the narrow interests of any party. Therefore, we need to avoid the attitude which, as the Malay proverb says, “menang sorak, kampung tergadai”. And we must always prioritise the interests of the people and the nation above all other interests.
Mr Speaker, the MADANI Government is very committed to ensuring the country's performance continues to rise at the global level through the implementation of various initiatives in a more innovative manner. The commitment of the MADANI Government in driving global excellence is proven by the fact that our homeland has risen 11 rungs. Ranked 23rd out of 34 in the Global Competitiveness Index, thereby making Malaysia the nation that recorded the greatest progress last year across the world. We have been regarded as the most improved nation in 2025. This is recognition on the world stage. Besides that, our country's Global Innovation Index has also risen. Most recently, Malaysia is ranked 34th among the best nations out of 139 countries in the world. It also reflects Malaysia's consistent innovation performance, in line with the MADANI Economic Framework. KPKT intends to maintain the platinum-rated ministry status and therefore will continue to integrate innovation into every initiative under the ministry so that sustainable development and a sustainable environment can be created. Mr Speaker, the government today always shows commitment and encouraging performance in raising the country's name in the eyes of the world in various aspects. Let not this success be belittled by issues that could lead to disunity. As in the Titah of His Royal Highness the Sultan of Perak, Deputy Yang di-Pertuan Agong, during the official opening ceremony of the 15th Perak State Legislative Assembly (Dewan Negeri Perak Darul Ridzuan Ke-15). I quote His Majesty the Sultan of Perak, he said— His Majesty's Titah: we are facing the challenge of finding a magic ingredient, an effective recipe to handle, fairly, justly and effectively, disputes in a diverse society. We are still groping in the dark, seeking a formula to help various parties become more rational, ready to see through the lens of unity and solidarity based on universal human values that appreciate harmony and stability. Mr Speaker, on this occasion I would like to thank the 28 Honourable Members who debated the five fields under the KPKT Ministry, namely Urban Planning, Local Government, Landscape Management, Fire and Rescue Services, and of course Housing. Alhamdulillah, I feel very grateful, as most of the 28 Honourable Members debated issues related to KPKT. There were no hot issues. Nor were there any chronic illnesses that we need to treat urgently.
In line with the wishes of His Royal Majesty Sri Paduka Baginda, I—and as a brief highlight, I feel it is necessary when winding up this Royal Address to inform this august House so that the service, devotion and sacrifice of KPKT's staff, our civil servants who have worked tirelessly, can be recorded in the Hansard. I am pleased to inform, and draw the attention of this august House, that the achievements over the past year are as follows. Up to 30 September, KPKT has succeeded in exceeding the target of providing 511,000 affordable housing units. The target was 500,000. We succeeded in exceeding the target. This is the first time in history... [Applause] Second, the provision of Rumah Mesra Rakyat. Under the Twelfth Malaysia Plan, the total set was 15,000 units. Alhamdulillah, we succeeded in exceeding the target by as much as 175 per cent. The target was 15,000 but we managed to complete 26,260 units compared with the original target. This is also the highest record in history. Another proud achievement. Third, in terms of MADANI Recreational Parks. In line with the dream of 1,000 parks. One year, 100 parks. For two consecutive years, KPKT has not only managed to achieve the target, KPKT has exceeded the target. As of this morning, 216 MADANI Recreational Parks have been successfully completed, and that is of course― I hope Mr Speaker, the constituency of Cameron Highlands, although it is already beautiful, if Mr Speaker plants trees, we will also be able to arrange for it. The MADANI Recreational Parks have, for two consecutive years, succeeded in exceeding the target. Fourth, in terms of maintenance, replacing old houses and old lifts, where 204 lift units last year were successfully replaced with new lifts so that the residents of nearly 100,000 residents in PPR flats can enjoy the positive changes that are being vigorously brought by the MADANI Government. The fifth, MyKiosk. 7,243 MyKiosk units have been successfully completed and have succeeded in changing the fortunes of nearly 7,000 families. As of today, 90 per cent have been put to use. And the most encouraging record: there is a small trader who, using a MyKiosk, earns more than RM20,000 in one month. I too feel very grateful. Previously he was B40, now he has become T20. Through hard work, we helped. Sixth, we also...
The Honourable Minister.
Cleanliness. Cleanliness― I will summarise.
The Honourable Minister.
It is not only an obligation, but it must become a part of faith. Toilet cleanliness, since we carried out public cleanliness reform― wait, yes.
Yes, it's all right.
Over these three years, I feel very grateful for the cooperation with the local authorities (PBT) and the Ministry of Education Malaysia (KPM). The MADANI Government has upgraded and rehabilitated more than 12,000 public toilets across the country to make them clean, attractive, fragrant― BMW. Okay. We also presented the Toilet of The Year Award. Let me give an example, Honourable Member. Last year we held the Toilet of The Year Award, and there was a category for places of worship. The winner was a mosque. The mosque in Gerik became the champion, having the cleanest toilet in the whole of Malaysia. The good should be made an example, and the bad made a boundary. I hope mosques in Kelate or Terengganu, for instance, will follow the good model set by Gerik. Yes, YB, a brief question.
Thank you. Earlier, about the kiosks, yes. Is there a recent study on the number of kiosks that have failed to be used and what action the Ministry has taken in implementing...
Thank you. That is why I am very― we monitor. I need to explain in this august House, Honourable Member. KPKT only provides the allocation. It is based on applications from 156 PBT. The PBT that apply, the PBT that appoint contractors, the PBT that look for locations, the PBT that must ensure the site is suitable. But, however, through careful monitoring, I admit it is not 100 per cent. But today we have already achieved 90 per cent. Out of 7,243 kiosks, nearly 7,000 have been filled. There are still a few that have not yet, we will take action. I feel compelled in this august House. Since the kiosks were appointed by the PBT, applied for by the PBT, and built by the PBT, then under the traffic light system, which is the PBT reform, any PBT that fails to fully fill the MyKiosks will have its allocation withheld immediately. We only give allocations to PBT that truly do the work. Those that do not do the work will fall into the red light zone. Those that do the work moderately will get a yellow light. The most―
best, will get a green light, and we will add and multiply the allocation for them. So, we give recognition to those who truly do the work. Please.
Thank you, Honourable Minister.
Are you well, Honourable Member? Okay?
Alhamdulillah.
Okey.
Semakin sihat.
All right.
I raised the matter regarding the SPNB Rumah Mesra Rakyat. Will the Honourable Member touch on it later, or has it already been covered? Because it was touched on a little earlier.
It will be touched on a little later.
Ada lagi?
Ada.
So, I will wait for that part, if there is time.
Yes, yes, that's fine. All right.
Menteri?
The Honourable Minister.
Boleh satu?
I have 15 achievements.
I want to convey my congratulations.
Oh, thank you. Go ahead.
Okay. Regarding efforts, I received information from members of the public concerning the installation of solar lamps in Bandar Mentakab. However, they asked me to ask about the cost, which is too high. Is it true that the cost is RM68,680 for only eight solar lamp units in Bandar Mentakab? So, I just— that is the first. Second, they asked me to ask about the kiosks just now. The one in Sri Layang has indeed been moved, it is gone, but it was taken to Taman Rimba, where it is still not being utilised.
That is all. Thank you.
Thank you. This question has two parts. One is about the solar lamps in Mentakab. I would like to tell the Honourable Member that I do not know whether the solar lamps referred to are under JKR (Public Works Department), or on federal roads, or on residential area roads. If they are in residential areas, they are placed under the PBT, which falls under KPKT's jurisdiction. For your information, since I was given this trust and responsibility, the government's policy has been very, very clear and firm. All expenditure must not only be prudent, it must ensure that a cost-benefit analysis (CBA) is carried out so that the prices we spend are not expensive but must be reasonable. That is why, according to the records I have― let me give an example at Kampung Bharu, which we carried out. One pole, including all installation work and all logistics work, is about RM8,000 per lamp. That includes installation and transport, all of it. Roughly. That is a reasonable price. If the eight solar lamps are now RM68,000, that is roughly it. Even if it is said to be expensive, it is not that expensive, because it includes the costs of logistics, transport, installation, labour, all of those costs. And then, under the current policy, a three-year warranty must be provided. That means, from this year until 2028, if the lamp is damaged, the contractor must repair it, a 100 per cent return. And the cost that the Honourable Member mentioned is already included in the warranty cost. With such a policy, first, there is no waste. Second, it is maintenance free. Because in these three years the contractor must bear the cost. The PBT will not pay anymore. That is among the things we are working on. And the seventh, we are also improving― last year, we also succeeded in upgrading the stalls of the MADANI Public Markets and MADANI Food Courts, with a total of 66 projects fully completed.
The Honourable Minister.
Eighth, we also succeeded in implementing 858 Chinese new village development projects with a total allocation of RM100.5 million across the country. And also, no one is left behind, no one is marginalised, 50 Indian settlements were also given an allocation of RM15 million for the benefit of residents in Indian villages.
That is why KKDW (Ministry of Rural and Regional Development) looks after traditional Malay villages. KPKT looks after Chinese new villages and Indian settlements. No one is left behind, no one is marginalised. We are all children of Malaysia. The ninth...
The Honourable Minister, a moment.
Apart from that, beyond infrastructure, socio-economic programmes are also important. Last year, we also approved allocations to benefit nearly 2,000 residents, including entrepreneurs in new villages. I would like to draw the attention of Honourable Members, if there are new villages in your constituencies. We have the One Village One Product policy, so that we educate village folk to become entrepreneurs. With permission, not only do we give them fish, Mr Speaker, we also teach them how to fish. That is important. Once they stand on their own two feet, self-reliant, then the government no longer needs to give aid. That is more sustainable work. Apart from that, the tenth, the government, KPKT, also continues through SWCorp. Here I must touch on illegal waste dumps. Last year, we succeeded in closing 3,634 illegal waste dumps. I sometimes joke, Mr Speaker, that illegal rubbish is not only illegal, it is damned illegal. Because the syndicates are extremely wicked. That is why I want to give this warning to this august House. Any syndicate that plays games with us, now we have installed CCTV. When there is an illegal waste dump, if caught and convicted, the maximum penalty is five years' imprisonment. A fine of RM100,000. That is why, keep things clean. Do not dump rubbish. Rubbish has its place, not― because I received a sad fact. Several waqf lands under the Islamic Religious Department have been turned into illegal waste dumps. That is why I say it is damned illegal. That is why we go out, we clean up, we arrest. There are more than one hundred who have been prosecuted, and hundreds of thousands in fines have been imposed by the courts thanks to the hard work of the MADANI Government. Mr Speaker, this year I once again invite Honourable Members, cleanliness is the responsibility of all of us. That is why previously we spoke of Cuti-cuti Malaysia. Now we have Cuci-cuci Malaysia. Last year we started with Malaysia Cleanup Day on 27 September, which is the third week, in conjunction with World Cleanup Day recognised by the United Nations. Last year when we held Malaysia Cleanup Day, Mr Speaker, do you know how many people took part...
part? 100,000. 817 volunteers took part. We have broken five Malaysia Book of Records. Besides that, for the maintenance of low-cost and affordable strata housing and public housing, last year, 334 projects were approved and implemented. Benefiting 360 thousand recipients across the country. Finally, regarding the PR1MA residential projects. Previously, under the former government, PR1MA had 34 sick projects. There were also projects that had entered ICU and CCU. Okay, but thankfully, by today, I chose this sacred date today. The last sick project at Bukit Katil— PR1MA. Finally, tonight I have performed a prostration of gratitude, having obtained the CCC. More than 40,000 units have been rescued by us. 40,000 units of sick PR1MA projects. All of that was the previous government, including our friends over there. I worked very hard, but before Hari Raya Aidilfitri, promises will be kept. All projects will be fully completed. Keys will be handed over before Hari Raya Aidilfitri. Mr Speaker, we indeed have all these achievements. Today I...
Yang Berhormat...
A little. I wish to extend my deepest thanks, a thousand thanks, to His Majesty the Yang di-Pertuan Agong. This morning I had an audience with Tuanku, and with utmost humility and modesty I presented the KPKT report card. We feel very grateful. Tuanku conveyed congratulations and commendation to KPKT. I want to dedicate this, this achievement, to all 22,000 KPKT staff who have been waiting for this good news. [Applause] Royal recognition, which we seldom receive, becomes a source of inspiration to all staff so that we continue to serve even better. Please, the representative from Kelate.
Yes, thank you, Honourable Member. I extend my congratulations for the efforts made by the Honourable Member. However, I want certainty. In the winding-up, the Honourable Member uses many Islamic words. Sujud syukur, alhamdulillah, bersyukur. Is the Honourable Member a believer? Does the Honourable Member believe in Allah? We do not want these words to be toyed with. I fear it will confuse Muslims. So, if this matter is toyed with, it seems to touch on the 3R that we are asked to protect. So, I do not want Islamic words to be toyed with
to confuse non-Muslims. If the Honourable Member is Muslim, I don't mind. But do not use religious words to confuse the people.
Honourable Member, Honourable Member, wait.
Honourable Member, I request to pass.
Do not be emotional, let us rationalise. Honourable Member, IC 03, I am also IC 03. Honourable Member— no, I am a child of Kelate. I am a child of Kelate. Born in...
It is not an issue of being a child of Kelantan. It is an issue of toying with religion.
That is why I want to say this. Wait. The Honourable Member may make statements, but listen to the explanation. As children of Malaysia, we respect Islam as the Religion of the Federation. Where is there any toying? That is why words like that are not appropriate. As a believer, I am sure the Honourable Member also hopes that we all show mutual respect. [Applause] Because within the framework of MADANI there is respect. Within the framework of MADANI there is Ehsan. Alhamdulillah is an word is Arabic words. Is that right? This is Arabic. In other words, if God willing, insya-Allah, if God willing. Alhamdulillah means, okay, I am already grateful. In the language of gratitude. In Arabic, alhamdulillah.
Alhamdulillah, all praise is due to Allah.
That is why I feel, let us not always lean towards issues that run counter to unity. We want to bring everyone together as one family. Children of Malaysia consist of Malays, Chinese, Indians, Kadazan, Iban, Dayak. We are all of one spirit and one heart. That is why in unity within diversity, we respect one another. That is why I will invite the Honourable Member to come to my ministry's Hari Raya Aidilfitri Open House. Do come, do not fail to come. That is why we want to ensure the spirit of Malaysian-ness...
Honourable Member, I seek to interject. Shah Alam.
...must be firmly nurtured in the heart.
May I do so?
Please, Shah Alam.
I feel very honoured and proud as a Muslim when the Honourable Member is able to pronounce the words that are often used by the Muslim community. [Applause] In Arab countries, those words are very commonly used, regardless of whether one is Muslim or not. So, I feel very proud and I pray that one day the Honourable Member will be granted guidance by Allah SWT. Thank you.
Thank you. I pay my deepest respects to my senior colleague. We will continue the noble practice of fostering unity and harmony in a multi-racial society. Indeed I feel...
Honourable Member, there is a little matter about home ownership. It is not related to the phrase, this is home ownership.
Ha?
About home ownership.
Sila.
Thank you, Honourable Minister. I have raised the issue of home ownership among the M40 group, which, according to the latest statistics from REHDA, shows that home ownership among this M40 group is low. They are trapped because of their salaries. For the B40 group there are PR1MA houses and so on. So, this M40 group is trapped and unable to own homes. So, what approach does KPKT take to ensure that this group is not marginalised in home ownership?
Thank you for a good and constructive question. I am pleased to inform that, thanks to the hard work of all of us working together, the home ownership rate of Malaysian families has reached 76.5 per cent. Australia is only just over 60. America is further behind. But Malaysia is at 76.5 per cent. Malaysian families already own their own homes. Of course the M40 will take housing loans. That is why under KPKT, we have introduced various initiatives to help. First, this year we have increased the Housing Credit Guarantee Scheme (SJKP). The amount has reached RM40 billion.
So far, so far, yes, thanks to the hard work of the government, we have helped 97,850 people obtain the government's Housing Credit Guarantee Scheme. What is special about this scheme? We
if you borrow RM100,000 from a bank, you can get a loan of RM120,000. The extra 20 per cent can be used for renovation, and can be used to buy furniture. That is the scheme. Under this year's budget, we have added another RM10 billion. RM10 billion. So, we want to ensure that by the end of this year we achieve the target of 100,000 home buyers guaranteed under the Housing Credit Guarantee Scheme. That is the first. Second, for villagers who have land but no house. That is why we have the Rumah Mesra Rakyat. Earlier, the YB for Tasek Gelugor already said so.
[Bangun]
Our annual target under the Twelfth Malaysia Plan is 15,000. But we feel lucky that we managed to succeed and exceeded the target. We have already completed 26,000. Okay, what is the scheme? Now, I would like to draw the attention of this House to my marketing for the Ministry of Housing and Local Government (KPKT). They own their land, but they don't have the money. Never mind, look to the National Housing Company (SPNB). SPNB builds a Rumah Mesra Rakyat for them, and the government bears the cost of RM75,000. They only pay RM55,000. In other words, every owner of a Rumah Mesra Rakyat gets a big angpau. A subsidy incentive of RM20,000 per house. If they don't have a deposit, never mind. Pay by instalments. Instalments how much? Very affordable. RM300 a month. How long can they pay? 16 years. And then how much interest? Zero. Interest free.
Menteri.
The government helps, interest free.
Pulai Menteri.
That is why— yes, please, Pulai.
Minister, thank you, Minister. I raised, and Pulai raised, during the previous debate. We in Johor Bahru, for example. We face the issue of many people coming in from Singapore, yes. Those who work in Singapore and buy houses in the Johor Bahru area. So, there are indeed many houses there. For example, in the Pulai Parliamentary constituency, we have 13 flat areas in the Pulai Parliamentary constituency. The issue is that those houses are high-cost. So, those in the low-income group, like the M40 and so on, where is their space to get a house in Johor Bahru? Because houses there are getting more expensive. And cheap houses are rather scarce. So, what is the government's policy to ensure that the social structure in Johor Bahru truly reflects the meaning, the spirit of Malaysia, yes? Poor, rich, all races are in this area. Thank you.
Thank you to Pulai, who is indeed concerned about the area of Johor Bahru. Johor Bahru's development is now very vigorous because we have the Special Economic Zone. So far, the launch of houses has recorded the highest figure last year. More than 15,000 new houses are being launched in the Johor Bahru area. Of course, we want to help, and that is why this year's budget gives incentives in terms of bank interest. They will get a rebate of up to RM7,000. Bank interest rebate. Second, the Housing Credit Guarantee Scheme. They can buy a house up to RM500,000. RM500,000 to get an apartment. That is why, to really solve this problem in the long term, the most important thing is that we need to increase the people's income. Ending poverty. Let me give an example: if the Honourable Member earns RM100,000 a month, and I give RM10,000, there is no problem. If the salary is only RM3,000, paying RM10,000 is really difficult. So, ultimately, this problem is about how we create high-paying job opportunities. So that Malaysia's children do not have to become migrant children. The Economic Planning Unit (EPU), KPKT and the Ministry of Finance (MOF) are currently looking for a way. That is why high-paying, high-income job opportunities are the government's main focus today.
Honourable Minister, directly. I ask you to answer the issue of SPNB giving houses free of charge to certain communities, when many others cannot get them and have to pay. So, why are privileges given? What is the justification for such selection?
Honourable Minister, the last question.
Just a little injury time, I know. Actually, Honourable Member, SPNB does not give houses for free. Those who get free houses are usually the very poor asnaf who are truly pitiable. For example, there are cases of a single mother with three children who are OKU (persons with disabilities). How is she going to care for three OKU children? We cannot simply not help in cases like that. Second, disaster cases. Fire, everything burnt down. Only underwear left. Nothing at all remains. Cases like that. Then, they are already frail. Their child has died. They are already 80 years old. Am I just going to watch them with only the clothes on their back, without helping? For such cases, we will find a way under the Rebuild House Programme. It does exist. With pleasure I would like to inform the Honourable Member. Honourable Member, if the area...
But why is there a special focus only on Kampung Baru Cina? In my place...
No, no, no.
In my place, I have individuals who meet the criteria the Honourable Member mentioned earlier.
Oh, that, yes, yes. That information may be less accurate. The rebuild programme is open to everyone. It falls under the jurisdiction of KPKT. I want to stress this. Kampung Tradisi Melayu falls outside the jurisdiction; that is under the Ministry of Rural and Regional Development (KKDW). The Most Honourable Deputy Prime Minister is actively helping with that. What I am in charge of is that area. That is perhaps why there is such an impression. But we are colour blind. For me, we are all children of Malaysia. So, one last topic, briefly, on reform as well. Public cleanliness reform. I want to stress in this august House that the commitment of the MADANI Government to reform cleanliness practices among society has been demonstrated through the enforcement of Community Service Orders for offences of littering in public places and on public roads, starting when? Starting with Visit Malaysia Year, 1 January. Mr Speaker, so far SWCorp has succeeded in issuing notices of offence to 600 offenders, consisting of 462 local citizens and, not forgetting, 138 foreign nationals. There are 46 cases that have received court mention dates, of which three have been convicted. Community Service Orders for offenders who have been convicted will be carried out simultaneously, one day before Valentine's Day, 13 February 2026. The nation of Malaysia will witness these offenders being made to clean drains, sweep roads, and clean toilets according to the court's sentence. Don't, don't litter. The maximum compound, according to the court's jurisdiction, can reach RM2,000 to RM10,000. That is why it is not about going for tazkirah, Honourable Member; that is the intention, our nawaitu is pure. We are not here to punish, but to educate. We want to ensure that all Malaysians help look after and cherish our earth. The earth does not demand rights; the earth demands good conduct. That's it! And that is why, under the Public Cleanliness Reform, which will be, we will involve seven main initiatives. Mr Speaker, just a little more. (i) deep cleansing; (ii) dust-free roads initiative; (iii) night-time cleaning;
(iv) use of electric vehicles for at least 50 per cent of the cleaning vehicle fleet, which must become EVs; (v) implementation of 50 per cent mechanisation to replace foreign workers; (vi) strengthening Separation at Sources (SAS) through the introduction of a two bin system, communal three bin, drive through recycling center, black soldier fly and composting system; and (vii) real time monitoring system with single window monitoring. All seven of these public cleansing reform initiatives will be implemented after the Cabinet approves the third cycle of the public cleansing tariff review in the near future.
Therefore, Mr Speaker, once again, I know Mr Speaker is very patient. I extend my thanks a thousand times to the Honourable Members for all their views, suggestions and criticisms. We will receive them with an open heart. Earlier I began with a pantun. I also conclude with a pantun, namely:
Royal Command we hold in high regard, KPKT serves with all its soul; That is all we have to conclude, may the benefits be shared by all.
Thank you. Xie xie, vanakkam.
Thank you, Honourable Minister. We move on to the next ministry. I invite the Minister of Women, Family and Community Development to proceed. 40 minutes.
Thank you, Mr Speaker. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. On behalf of the Ministry of Women, Family and Community Development, I express my appreciation and thanks to all the Honourable Members who debated and raised issues under the purview of the Ministry
of Women, Family and Community Development (KPWKM) during the debate on the Motion of Thanks for the Royal Address of His Majesty the Yang di-Pertuan Agong, from 20 to 29 January 2026. I appreciate all the views and suggestions that have been put forward, and they will be taken into account in KPWKM's future planning, including the recommendations for improvement that have been stated or proposed by the Honourable Members. God willing, today I will respond to the questions raised by the Honourable Members during the debate on the Motion of Thanks. Mr Speaker, I will begin by responding to the issue of 30 per cent women's participation as policymakers and participation in politics. For the information of the House, in 2004, the government set a target of at least 30 per cent women at decision-making levels in the public sector. This affirmative action has been taken into account since the Ninth Malaysia Plan. The results, according to statistics from the Public Service Department (JPA), show that as of December 2025, women's participation at the top management level in the public sector has reached 39.4 per cent. Key positions that were previously led and held only by men are no longer unfamiliar for women to occupy, such as the posts of Auditor General, Chief Justice, Director General of Customs, Mayor and so on. Furthermore, in 2011, the government also announced the extension of the policy of at least 30 per cent women's participation at decision-making levels to the private sector. This reflects the government's commitment to increasing women's participation in employment, and at the same time narrowing the gender gap in this country. Now, data by the Securities Commission Malaysia as of April 2025 shows that women hold 33.1 per cent of board seats in 100 listed public companies, or PLC, with izin, the top 100, with izin, on Bursa Malaysia, up from only 14 per cent in 2015. Based on these statistics, it can be concluded that much progress has been achieved, especially in efforts to empower women in both the public and private sectors. However, it cannot be denied that the percentage of women's participation in politics remains a challenge.
Mr Speaker, various initiatives and efforts have been implemented by KPWKM to improve the position of and encourage women's participation in top leadership. Throughout 2025, KPWKM through the Women's Development Department (JPW) spent a total of RM11.5 million on implementing various women's empowerment and leadership programmes. Among the programmes implemented is the Women's Leadership Apprenticeship Programme, namely PERANTIS, which aims to enhance the potential and number of talented women as individuals who are eligible and suitable to hold high positions, whether in the civil service, the private sector, or playing a more influential role at the community level. In line with KPWKM's efforts to empower and increase women's participation in a more inclusive manner across various fields, this programme is not limited only to specific categories, but can also be utilised by the category of women in politics. In 2024, a total of 1,247 PERANTIS participants were mentored by 25 leaders in 10 selected fields. Of that number, two leaders organised programmes related to political leadership and benefited a total of 70 participants. Meanwhile, in 2025, the implementation of PERANTIS continued with the involvement of 100 women leaders and 4,035 participants. Of that number, seven leaders organised programmes related to political leadership and 284 participants. We will continue the PERANTIS programme this year. Therefore, any party that wishes to apply under the category of women in politics is welcome to submit applications through the Women's Development Department portal, www.jpw.gov.my, before 28 February 2026. Mr Speaker...
Excuse me, Honourable Minister, a little passage. The issue of women and politics. Thank you. I thank you, Mr Speaker. I congratulate the ministry on the good efforts that have been made. I hope these efforts will be more successful. So, from the study and research done by the ministry, what is actually the cause that women's participation in politics is still lacking? When we see that more than 50 per cent of voters are women.
Almost 70 per cent, we see women in institutions of higher education, and many experts in various fields, but we still see that we are lagging behind in politics. So, what challenges have been identified as the causes, and what approaches, other than the existing programmes, will the ministry take? Thank you.
Okay, thank you, Honourable Rantau Panjang.
Honourable Minister, same issue.
Let me answer one by one. I am afraid I will forget otherwise. Later, Honourable Member.
Okey.
The reason given for why women's participation is still low is because this is the practice in our country. Political parties are parties led by men. There are no women leading them at all. Apart from that, when people become voters, they do not vote based on gender. They vote based on party. So, as long as this practice exists in our country, that is how it will be. So, this is what I believe, Honourable Member, is the same as what I think. We are always at international seminars, and this is the findings, with permission, because as long as the practice is like that, it will remain so. We vote based on the party. Thank you. Honourable Mumtaz.
Okay, thank you, Mr Speaker. Thank you, Honourable Minister. We are aware that this ministry was established in 2004. It has been almost 30 years. This means that in this case, we have been seeing for almost 20 years that developments in this political sphere, as mentioned by YB Rantau Panjang just now, have been very, very slow. So, since the PERANTIS programme I think has been somewhat successful, but we will be facing the general election (PRU) soon. So, it requires more proactive action from the government to ensure, in terms of leadership in Parliament, at least in the Dewan Rakyat, because our country is among the lowest in Southeast Asia for women's leadership in the Dewan Rakyat.
So my question is, is the government prepared, in a short time, to draft an act, whether a gender party act or any other act, to provide some scope so that our proposals and aspiration to see at least 20 per cent, 30 per cent, become a reality within an immediate timeframe? Because if we look at it naturally, it has been 20 years without any progress. Thank you.
Thank you. Honourable Member, when I entered politics in 2008, we had about 14 per cent women, but after that, although there were many women candidates, the women voters still did not vote for women but voted for the party.
So that is why we find that it is becoming less and less. What do we do as a ministry? That is why, in the past two or three years, we have seen the PERANTIS programme. That is one of our ways to encourage women to get involved. They will, with permission, pitch their leadership. I hope more women will pitch more towards political programmes. But so far, in the first year, we only had two states that pitched, with permission, in the political field. All the others were in the economic field. What else can we do? That is why we hope more women will get involved in the political field.
[Bangun]
Besides that, I also see in terms of improvement, and we see improvement, with permission. In this House, women really stand out, even though in terms of numbers, we are not many, but we can see their quality. I just hope that, together, we women hope that political party leadership will give more space to women. Ask that, if everyone agrees, that the government be asked to give space to women.
[Bangun]
There are certain formulas for us to amend the law. For example, in terms of the Constitution, in terms of us working together with political parties to ensure at least 30 per cent in every political party.
When there are 30 per cent women, then during elections, let women contest against women, and we will still get 30 per cent. But this has not happened yet. For decades this has been the case, and it is still like this. This means we women still have not exercised our rights as women. Let us women together have this voice and bring it to the political parties. Thank you. I see Temerloh.
Okay. A little addition.
Ya.
I fully support what the Minister has said regarding the women's quota. However, I see that although women are making preparations, with various programmes, we also want awareness from the men, of how important it is for them to give confidence to women's leadership, because we know that these voters are not only the large number of women, but in fact these women are their mothers, sisters and siblings, and they have skills and abilities that sometimes exceed those of the men. That is just my view, so that we see that we are given the space we should have. Okay, thank you.
Thank you, Honourable Member. I agree. Let us campaign together. Ask the men in here. There are not many men here in this House to jointly support everything that has been put forward just now.
Minister, a little from Ampang.
It seems only Question Number One can be answered like this. [Laughter] Please, please, please.
I listened carefully to the Minister's reply. Actually, what was asked and answered does contain points that we need to pick up. First, the Minister answered that the number of women candidates has increased compared with those who won. But the issue I saw just now is that we lack a bill to provide that space. That is why, if we look at many countries, they have already enacted an electoral policy and set a 30 per cent quota for parties. The party must submit 30 per cent of names first before it is allowed to contest in the election. So, if that is a commitment that can be made, I
feel it would give women a wide space. The problem is not that we do not have enough candidates. Thank you.
Thank you, Honourable Member for Ampang. That is what I stated earlier, that we need the government to— but the government cannot force it; it needs cooperation among political parties to enable this Bill, where we allocate 30 per cent for women to be candidates. After that, each party will still field 30 per cent women candidates, and when the election comes, let them contest, compete among themselves, and 30 per cent will win or lose. Because we have set 30 per cent, but the constituencies, let them become constituencies involving women. I see Mr Speaker has also begun to be interested in listening. But I feel...
Not that, Honourable Minister, I am waiting for the men to support, Honourable Members. That is all.
Thank you. But thank you to all my female fellow Honourable Members.
Responding to Speaker, may the Minister be given a little time?
I can, but this first question is not yet finished.
On behalf of the men in this House.
Okay, I will let it be. Last.
Responding to what Dato' Speaker said, we men have no problem with women going to the appropriate places, as long as the place is suitable and in line with their capabilities. A small suggestion to the Honourable Minister, perhaps you could propose it. Some women are working, and some are not working. For example, women who become housewives. They have to stay at home, look after the children, and raise the children. What if, in order to also recognise these women, the government considers a housewife allowance for those who work as housewives? In fact, being a housewife is also a professional occupation. Would the Honourable Minister agree to support the idea just now? Thank you, Dato' Speaker.
Thank you, Honourable Member. Actually, I have given a talk on this matter regarding unpaid care work. These women work at home but receive no salary. Their husbands do not give them a salary either. Moreover, if the government wants this. But I believe the government is also looking into this matter, so that we can provide something like an allowance, perhaps. I definitely agree with this. But this is what I would hope— on behalf of us, we will always voice out on behalf of women. Do not forget that there is a wife at home; give an allowance to her. She works day and night until she cannot even sleep. Thank you, Honourable Member. I want to continue with the ideal of efforts, Mr Speaker. Efforts to increase women's participation in politics should not be made solely through legal obligation. What women want is not an opportunity because of a law that compels. But the opportunity given must come from their qualifications and abilities, and not be viewed solely through a gender lens. At the level of the Ministry of Women, Family and Community Development (KPWKM), we have started initiatives to hone, multiply and highlight women with great talent. Meanwhile, in efforts to increase women's participation in the political arena, all political parties need to have determination or political will, or, with permission, political will, in giving opportunities and bringing forward more women, whether at the highest leadership level or as candidates in elections. When all parties play their respective roles, God willing, our hope to witness an increase in women's involvement in politics can be realised. But we must be together, always together, in voicing this. I now move on to the question from the Honourable Member for Temerloh, who wants to know the efforts implemented by the government in building well-being families. Meanwhile, the Honourable Member for Pulai proposed that KPWKM draft a specific agenda for the urban poor group involving productive families. In this regard, KPWKM is of the view that urban poverty is not merely an income issue, but is closely related to family resilience, with permission. Financial literacy, children's education, mental well-being, community values and the building of identity. Accordingly, KPWKM, through the agencies under it, implements various structured interventions. Through the National Population and Family Development Board (LPPKN),
the approach taken is based on the development of productive families, namely families that are able to manage resources prudently, educate their children well, maintain household harmony and function positively in the community. For information, KPWKM, through LPPKN, has introduced and implemented various programmes and services to strengthen family institutions, involving a series of parenting courses and the strengthening of marriage institutions throughout the country.
LPPKN has implemented the SMARTSTART pre-marriage course for couples who are going to marry and who have just married, five years and below, which is the marriage age group most at risk according to divorce statistics in Malaysia.
[Bangun]
Based on current needs, this module has been improved, making it the SMARTSTART 2.0 Module, with permission, in 2020. Based on an evaluation study of the SMARTSTART 2.0 Programme implemented by LPPKN for 2025, a total of 77.8 per cent of participants acknowledged that their level of knowledge had increased after attending the programme. In addition, 66.7 per cent of participants showed an improvement in terms of practice, while 55.6 per cent recorded an improvement in behaviour.
Menteri.
Bagi...
Pulai, Minister. Thank you to the department— the Minister's reply. My question, in terms of this family development, does it refer to urban poverty? That is, does this Ministry of Women Development take the information of those categorised as urban poor in order to develop them? And is there a continuous agenda to ensure that they can get out of urban poverty? Thank you.
Thank you, Honourable Member for Pulai. In addressing the earlier question, we do not rely solely on the issue of urban poverty. We evaluate it comprehensively, and of course we also obtain— if from the statistical perspective, we find from the Department of Statistics Malaysia (DOSM) as well, apart from us being transparent— we also organise programmes, through which we obtain feedback too, or feedback, with permission, from the participants.
And we— is the agenda just now, which is said to be more about urban poverty? Actually, we cannot look at it from that angle alone. Most of what happens comes from the family itself. I really— want to champion, with permission, that these noble values are practised within a family. That is why, for me, as someone who wants to marry, as a parent, when they go through the courses we organise, we hope there is some awareness.
[Bangun]
And of course there are those who state that after attending our programmes, there is indeed awareness. But the level of awareness, however high, also depends on how they were brought up. Honourable Member.
Honourable Minister, thank you. Mr Speaker, thank you. Honourable Minister, I admit, alhamdulillah, that those who attend are very good for the programmes under LPPKN. But we have many times proposed to the government that it make mandatory education for fatherhood courses. That is one. Second, what is the number of attendees in proportion to families in Malaysia who have attended this programme? Because this programme is very good, and I understand this board sets a small fee for them to attend the course. But today, the need for families to obtain fatherhood education is something very critical. And I think the time has come for the government to allocate either a bigger syllabus or other means so that more knowledge can be disseminated to parents, because we do not want the cases that are happening today to occur. Thank you.
Thank you, Honourable Member. I have not finished with Pulai yet. I want to continue. However, it is not only us who carry out that evaluation, but it is also through cross-ministry efforts with other ministries. And we obtain feedback from there too, with permission. Thank you, Honourable Member for Tumpat. You know, we do hold programmes for parents, especially fathers too, we give priority. And as for how many— later, if there is, they will give it to me, and I will state here how many and how much allocation we have used to ensure this programme has a good effect, Honourable Member. Together we—
We certainly want to see our programme have a high effect and impact on our society. Because when it has a high impact, we can see that effect in the children at school. So from there too, we can see how the role of parents is clearly reflected in their practices at home, as I stated earlier. Mr Speaker, for couples at the age I mentioned just now, Honourable Member— for couples whose marriage age is five years and above, there is the SMARTSTART 2nd Honeymoon Programme. We have a second honeymoon, but not for a second wife, yes; it is the same wife. It has been developed to empower and help couples to remain resilient in defending their respective families, and to help reduce the divorce rate in Malaysia. LPPKN, Mr Speaker, also provides family and marriage counselling services to attend to couples facing difficult moments in their relationship, through individual, family and group counselling. Accessibility to these counselling services is offered physically and online to optimise their reach so that they are broader and easier to access by society, especially young couples. KPWKM is committed to strengthening the role of family counselling as a preventive strategy and early intervention in facing difficult moments and family social crises. More than 100,000 individual counselling sessions and more than 130,000 group counselling session clients have been carried out from January 2018 until December 2025. In addition, LPPKN also implements the Parenting@Work Programme, with permission, and Family Knowledge@LPPKN, which focus on parenting styles, creativity and conflict management, particularly interpersonal problems between couples. From 2022 to December 2025, a total of 117 Parenting@Work Programmes involving the participation of nearly 4,000 participants and 491 Family Knowledge@LPPKN Programmes involving more than 20,000 participants were conducted. Therapy-based stress management programmes such as mind therapy were also implemented, involving more than 16,000 participants. The effectiveness of this approach has been proven through impact assessment. The Evaluation Report of LPPKN Family Programmes for 2025 shows that, firstly, 99.3 per cent of participants acknowledged an increase in their level of knowledge. Secondly, 90.96 per cent of participants practise the knowledge learned. And thirdly, 71.88 per cent of participants experienced positive behavioural change after
joining the programmes. This proves that family interventions not only increase knowledge, but also shape attitudes, values and a more well-being way of life. KPWKM through LPPKN has also implemented the LPPKN Mediation Body Pilot Project, which was carried out from November 2024 until September 2025. It is a strategic collaboration with the National Registration Department (JPN) and an integrated initiative to manage marriage and divorce crises for non-Muslim couples more effectively and conducively. Through this pilot project, a total of 83 couples were referred to this mediation body. Of that total, 13 cases, or 16 per cent, were successfully reconciled and did not proceed with divorce applications in court. Compared with the statistics of reconciled cases, only two per cent before this pilot project was conducted. The LPPKN mediation body shows positive development. For 2026, the pilot project that began in the Federal Territory of Kuala Lumpur will be expanded to three states, namely Johor, Sarawak and Selangor.
Meanwhile, it cannot be denied that economic challenges can also contribute to household conflicts. In this regard, KPWKM, through the Department of Social Welfare (JKM), has prepared and channelled appropriate welfare assistance for those who are eligible, such as child assistance that can help ease the burden of parents. Through the initiatives that have been implemented, KPWKM hopes that the well-being and harmony of family institutions will improve and, indirectly, can reduce the divorce rate in Malaysia, God willing. Amin. We hope that is the situation. Next, I move on to the next question. This is more about the MyIBJKM application. Next, Mr Speaker, the Honourable Member for Tenom has touched on issues relating to the MyIBJKM system used for the purposes of registering and channelling assistance during floods. Among his proposals is that the registration of flood victims be reverted to be done manually instead of using the MyIBJKM system. He also raised several technical questions regarding the system. For information, the role played by KPWKM through JKM in disaster management is to prepare and manage temporary relief centres (PPS) as an effort to improve the quality of service
in disaster management. JKM has developed the JKM Disaster Information System, or MyIBJKM, to improve the quality of services for registering disaster victims at PPS. MyIBJKM also functions as the main reference system for disaster management, including the collection and reporting of victim statistics in real time, or live data, with permission, to ensure fast, accurate and up-to-date access to disaster information for stakeholders as well as the public. Registration methods in the MyIBJKM system can be carried out through the MyIBJKM application, the website and manually through offline mode, with permission. The public or disaster victims may choose whichever registration method is most suitable and convenient according to their respective circumstances. For victims who are not skilled in using the application, do not own smart devices or face literacy constraints, JKM officers will assist the registration process through the website face to face. For areas without internet coverage, manual registration will be carried out and subsequently the information collected will be integrated into the MyIBJKM system. This is to ensure that all disaster victims' information can be referred to using the system by any relevant party, such as in the distribution of cash aid. This registration can be carried out either during the early registration campaign before a disaster occurs or while victims are at the PPS. Honourable Member for Tenom further wishes to know what is the status of disaster assistance applications by victims who are outside the radius of the PPS. For information, it is true that the MyIBJKM system identifies the disaster radius through the location of the PPS. However, the determination of that radius is flexible and can be decided and matched at field level according to the suitability of the location of the PPS opened. This method is used as a matching indicator of the disaster area. At the same time, the method of controlling or limiting the operational radius of registration at PPS is intended to prevent any misuse of registration by irresponsible parties to obtain assistance distributed by the government. For example, this control can prevent the registration QR code at each PPS from being widely circulated and scanned so that non-disaster victims in unaffected places also use it. This is the best way to help, yes.
Meanwhile, we are aware that in isolated cases, there are disaster victims who were unable to register at the PPS because no PPS was opened in areas near them, even though those areas were hit by disaster. This has given rise to claims that disaster victims were left out from receiving assistance. To address situations like this, disaster victims may apply for aid payments through victim registration centres (PPM) that are opened after the disaster subsides. [Mr Speaker presided over the Sitting] The location and opening of these PPMs fall under the purview of the district officer, as chairman of the district disaster management committee, once it has been confirmed that the areas where the victims live are also areas hit by disaster. Mr Speaker, with that, my winding-up session on behalf of the Ministry of Women, Family and Community Development (KPWKM) for the winding-up debate on the Motion of Thanks (Usul Menjunjung Kasih) in the Dewan Rakyat today has come to an end. Once again, I would like to record my appreciation to all Honourable Members who have voiced views, proposals, improvements and criticisms involving the target groups under KPWKM, and I appreciate everything that has been raised, and KPWKM will take appropriate action based on the input received. The cooperation and support shown by all Honourable Members towards the ministry's initiatives, especially in handling issues that are very close to our hearts, are hoped to provide greater benefit to the people of Malaysia as a whole. Oh, I understand there is an issue that was left out. But I see the Honourable Sandakan is not in the House. Is the Honourable Kuala Kangsar in the House? No. The Honourable Tan Sri, Sekijang is also not here. We will provide a written reply. Thank you.
Good. Thank you, Minister. And the last ministry today is the Ministry of Transport. I invite the Minister, 40 minutes from now. Please proceed.
Thank you, Mr Speaker. Salam sejahtera, salam Malaysia MADANI.
Mr Speaker, allow me to record my highest appreciation for the concern of Honourable Members regarding the Ministry of Transport (MOT) debating and touching on matters under the MOT's scope of duties. MOT is always committed to providing safe, efficient and sustainable transport services throughout the country to improve quality of life and support a competitive economy. The Honourable Simpang Renggam raised in the debate the need for the country to invest more in rail and port infrastructure. Development expenditure in the rail sector does indeed involve high costs and long-term financial commitments. The country has been and is implementing several large-scale and strategic rail projects. For example, the total cost of implementing the East Coast Rail Link (ECRL) Project so far, involving the alignment from Kota Bharu, Kelantan to Pelabuhan Klang, Selangor, over a distance of 665 kilometres, is RM74.96 billion, including land acquisition costs, interest costs during construction and other related costs. For the information of Honourable Members as well, the government has also agreed to implement the corporatisation of the railway industry through the implementation of a government-to-government passenger train leasing method. As a commitment to implementing this project, the government has signed an MoU with the Government of the People's Republic of China on strengthening of cooperation in the railway sector on 14 April 2025. Bilateral negotiations are being held to establish a special purpose vehicle that will be responsible for implementing the programme. For the Thirteenth Malaysia Plan (RMK13), first rolling plan, MOT has been allocated RM5.1 billion, and of that amount, RM1.4 billion or nearly 30 per cent has been allocated for rail sector projects. In terms of investment in the port industry, governance relating to the operation, development and investment at federal ports has been implemented through privatisation based on the build-operate-transfer concept since 1990. This method is implemented by appointing private companies as port operators through concession agreements under the Ports (Privatisation) Act 1990. Through these concession agreements, the concession company is fully responsible for financing, implementing investment, developing and
operating the port independently and sustainably without reliance on federal government financial allocations, subject to approval and supervision by the commission or the Port Authority as well as the Ministry of Transport Malaysia.
This approach has been proven effective, as shown by the achievement of the Port Klang Authority, which ranks 10th in the world in the Lloyd's List 2025 with throughput of RM14.64 million TEU in 2024. Accordingly, Tanjung Pelepas Port also maintained its 15th place in the world with a record throughput of RM12.25 million TEU for the same year, despite involving minimal investment from the Federal Government. The Honourable Kuala Nerus questioned the allocation for Pelabuhan Kuantan and portrayed Pelabuhan Kemaman as if it were being treated as a stepchild in the distribution of funds. For the information of Honourable Members, the development allocation for the breakwater at Pelabuhan Kuantan, which was fully completed in 2019 at a value of RM1.2 billion, was obtained through the allocation managed under the East Coast Economic Region Development Council (ECRDC). As stated earlier, the concession company, as the port operator through the Federal Port Authority, is responsible for planning port development, including preparing and implementing port expansion plans. For example, investment into Pelabuhan Klang and PTP, which are among the busiest ports in the world, was also carried out by the concession company. For the information of Honourable Members, I also visited Pelabuhan Kemaman on 22 September. The Honourable Jerantut, who is a board member of Eastern Pacific Industrial Corporation (EPIC), the holding company of the Kemaman Port Consortium that operates Pelabuhan Kemaman, was also present. During the visit, I closely followed the progress of the ECRL installation works to Pelabuhan Kemaman. The Federal Government through the Ministry of Transport, together with the Kemaman Port Authority and the Kemaman Port Consortium (KPK), as the company appointed for the time being, is actively moving in actions to review and refine the proposal for the expansion of Pelabuhan Kemaman, including the feasibility and method of constructing a new breakwater at the port.
During the MOT KPI setting session last month, I also received a briefing on the implementation of the Land Reclamation Project Phase 1A in the waters adjacent to the East Pier of Pelabuhan Kemaman, to provide the physical corridor and structural foundation for the construction of the ECRL spur line entering the port, in addition to increasing the area of open storage to support multimodal logistics operations. So, I encourage the Honourable Kuala Nerus to spend more time understanding the issues faced by Pelabuhan Kemaman in Terengganu, rather than questioning port development in Pahang. So the Honourable Jerantut can also help. So I want to say that it does not arise at all that Pelabuhan Kemaman is being treated as a stepchild, because Pelabuhan Kemaman is also a federal port. As for funds, if it is said there are no funds and so on, most federal ports do not receive funds from the Ministry of Transport. So I want to say that development, the current development model, is indeed based on the concessions granted to concession companies.
Mohon penjelasan.
If there is their action plan, their development plan, and of course the Ministry of Transport will support it in terms of policy.
Clarification. The Pelabuhan Kuantan breakwater received its funding from the federal government. Why is the Kemaman breakwater being built by the private sector, EPIC? Thank you.
As I said earlier, for Pelabuhan Kuantan, in terms of its breakwater, that allocation came through the East Coast Economic Region Development Council (ECRDC). At that time, this was roughly 10 years ago. So what we are doing now for Kemaman, the ECRL spur line, we have not cancelled. The spur line does indeed connect to Pelabuhan Kemaman. But in terms of negotiations, in terms of agreement between the Federal Government, between the Kemaman Port Authority and the operator, namely the concession company, they have agreed to provide the land site. So, Honourable Jerantut, is here as well. I went to Pelabuhan Kemaman that day, a few months ago, and there was no problem at all. That matter did not arise because the commitment required from the Ministry of Transport is to ensure that the ECRL can be implemented. So for
us, there is no problem. That is why it is indeed within the scope of the ECRL project. The spur line connection, we have not cancelled. Even until today, the land site is not yet available, because it has not been reclaimed. But the commitment from the operator, namely EPIC, is to state that they are responsible for providing that land site, namely in terms of reclamation. That will be implemented by the operator. So, I think the question of whether the Kemaman Port Authority and the consortium have an agreement over there does not arise. The agreement is already in place. That day, we negotiated well that the commitment required from the Ministry of Transport and the Federal Government is to ensure that the ECRL project continues. In fact, we requested that the land site be prepared earlier. Because right now, the ECRL contractors are nearly at the end. They are worried that if the land site cannot be prepared, then they cannot complete the project according to the agreed timeline.
Thank you, Honourable Minister. At the EPIC level, we are indeed very grateful, and the Terengganu State Government is very grateful to MOT for launching the process of the per land project. Only what was raised by the Honourable Kuala Nerus, Minister, is that if the breakwater is given assistance by the government of RM1.2 billion just now, can we later also ask for assistance from the government, because we also need the breakwater project that will take place in the stages after this. After we complete that spur line. So, can the government, or does it have the capacity, to help Pelabuhan Kemaman, which is under MOT, also for the same project? That is what it means.
Let us negotiate. Do not make accusations first. The accusation is that we are treating them as a stepchild, that we do not give consideration, that is an accusation. So if there is a need to build a breakwater, say the consortium is unable to build a breakwater, there is a need to obtain assistance from the Federal Government, we negotiate properly. It is not that I am refusing, it is not that I am closing the door to negotiations. I have never closed any door of negotiations with any party, with any state government. Recently, I went to Kelantan, Kota Bharu last week, together with the Menteri Besar of Kelantan, even taking the bus was no problem. So that is what I want to say, Honourable Member over there, please
do not make reckless accusations, saying we treat them as a stepchild, we do not give assistance and so on. If there is a need, we negotiate, we discuss properly. So, we can raise the consideration to the KE, to the Ministry of Economy (KE), for them to consider, because whatever we allocate also requires approval from various other ministries. It is not that MOT can block it or MOT does not want to do anything. For any development allocation, first we need approval from the Ministry of Economy and then there must be capacity from the Ministry of Finance. That is what I am saying. The focus now is that together we ensure the spur line for Kemaman Port is resolved, because right now it is hanging. If Honourable Members make a visit to Pelabuhan Kemaman, I can ask Malaysia Rail Link (MRL) to provide a briefing. If the reclamation is not resolved, the land site is not there, the track cannot land. It will be left hanging up there. So, that is what will cause the ECRL project not to be completed for Kemaman. I have already gone to see it, I have already understood the concept. What the problem is. If the land site is not there, cannot be prepared, cannot [Unclear] it cannot come down. It cannot land. Honourable Member. So that is its problem. So the focus now is that we must ensure the spur line is completed. As for the breakwater, that is the next phase. So for the next phase, we will negotiate how we are going to do it. We have not said we cancel or do not approve it. It is just that there has been no negotiation so far to that point. So I hope Honourable Member understands this matter and is clear on this, and for us, the main focus now for Pelabuhan Kemaman is to ensure that our track does not remain hanging in the middle. It cannot land later. So I hope, and we must implement, so that the spur line can be implemented properly and completed. Next, the Honourable Rantau Panjang and the Honourable Jerantut have touched on the issue relating to the latest status of the rail extension to Rantau Panjang. For the information of Honourable Members, the Pasir Mas–Rantau Panjang railway alignment is a strategic route to the Thailand border for passenger and cargo services. However, the operation of the service was halted following safety issues and damage to track infrastructure caused by floods more than 10 years ago. In this regard, the government has approved the project to upgrade the Pasir Mas–Rantau Panjang Railway Track under the Thirteenth Malaysia Plan (RMK13), Rolling Plan I at a cost of RM264 million to enable the railway service to resume operations.
Api Pasir Mas Rantau Panjang di bawah RMK13, Rolling Plan I dengan kos RM264 juta bagi membolehkan pengoperasian semula perkhidmatan kereta api tersebut.
Since the project to upgrade the Pasir Mas–Rantau Panjang route has been approved, the MIL and RAC will carry out further detailed discussions to coordinate the most suitable method of implementation. This includes proposals so that the potential operations of KTMB and ECRL can be optimally utilised, integrated with the existing rail network, and provide comprehensive economic and socio-economic benefits to the local residents. Regarding the issue of compensation to railway land tenants raised by the Honourable Rantau Panjang. MOT through RAC fully understands the concerns raised regarding the status of tenants on railway reserve land involved, especially tenants who have long been conducting economic activities in the area concerned. Accordingly, to reduce the impact on the tenants involved, RAC will assist in identifying and considering suitable alternative sites to be offered to the tenants concerned. However, in line with the responsibility entrusted to it, RAC will ensure that every planned rail network development project can be implemented for the sake of public interest and the development of the country's transport industry, especially for the people of Kelantan State. RAC is committed to implementing this project prudently, orderly and in a balanced manner, taking into account the interests of national development and the welfare of the local community. RAC sincerely hopes that the affected tenants can understand this situation and provide cooperation to ensure this process is carried out fairly, orderly, and reduces the impact on them as much as possible.
Just a moment, Honourable Minister. The question we raised during the site visit by the Select Committee on Infrastructure, Transport and Communications (JKPK) to the ECRL on the final alignment in Kota Bharu. When we discussed with MRL, it was said that a connection could be made from Kota Bharu to Rantau Panjang, ECRL. So, my question in my debate is whether there is any planning for the future to extend from—ECRL, not just rail, ECRL from Kota Bharu to Rantau Panjang because there is eco-tourism there that
can raise the standard of living in Pasir Mas and also in Rantau Panjang, as well as the enhancement of the halal hub there.
It is possible, not impossible. However, in terms of its financial implications. To extend the Kota Bharu to Rantau Panjang alignment, the cost is RM2 billion. That is what we need to understand. So, what we have obtained approval for from RMK13 is the redevelopment of that alignment using the existing track, namely the KTMB track. The existing alignment is the KTMB alignment, but I have also asked MRL and RAC to look at how to integrate KTMB with ECRL. So, we want to see which approach is most optimal. In terms of cost, it can be reduced and it can connect ECRL with KTMB. So, that is what needs to be integrated. So, we understand what is expected, namely that there should be an ECRL connection to Rantau Panjang. So, for me, during the previous administration, the alignment to ECRL was actually going to Tumpat. But Tumpat does not have a connection to the rail system in Thailand. So, if we look at it from the strategic planning perspective, if the rail connection should be to Rantau Panjang, okay. I am not trying to pit Rantau Panjang against Tumpat, okay. I have no such intention. But I am saying from a strategic perspective. The strategic aspect is that Rantau Panjang's rail system connects to the Thai rail system. So, there is a strategic importance. If we were to build ECRL tomorrow, it would perhaps be more strategic in terms of its connection to Rantau Panjang compared to Tumpat. That is my view. But we have not reached that point. What we have decided is that we revive the Pasir Mas to Rantau Panjang alignment, and we will see how it integrates with ECRL. Yes, please proceed.
Thank you, thank you, Honourable Minister. Thank you, Mr Speaker, and I thank my friend from Jerantut for his concern about the needs of the people in Rantau Panjang. I thank the Minister for what the ministry has done. However, I would like to know, so far, how far have the negotiations gone, especially with the neighbouring country? When will the connection from Rantau Panjang to Golok begin? Because that is what can generate cross-border economic activity. And likewise, I would point out that Rantau Panjang has a halal industry hub.
So far it cannot be developed, it is not viable because of the lack of infrastructure. So, if this ECRL is implemented, it will become an alternative for the cargo transport of the industries concerned. So, this matter should be pursued even though we know the financial position is still not assured, but efforts must be made towards how to develop the cross-border economy. Please explain.
Yes, thank you. Firstly, regarding the connection to Golok, it is true that at the level of Malayan Railway Limited (KTMB) and the State Railway of Thailand (SRT), discussions have indeed taken place. But the problem, Honourable Member, is— I too went to meet the Thai Minister of Transport last year. But after I met him, two or three months later, he fell. He has been replaced now. Right now there is an election. So, there is no new government yet in Thailand. I wanted to hold discussions, but I did not know with whom to hold them, because there is no new government yet. A new government will only be formed after the election, but at the level of the Technical Working Committee, discussions have indeed been held. The technical site, I think, has no problem. It can be connected, no problem. Only, we need a policy decision from both countries. So, we do want to expedite it, but the problem is that Thailand's government is not yet stable. So, I intend to meet again with the new Minister of Transport after a government has been formed in them, so that we can give priority to both of these connections, whether at Golok–Rantau Panjang or also on the Padang Besar side. Both of these are important. Regarding the halal industry in Rantau Panjang, I know that we want to upgrade the industry there. That is why we want to revive the Rantau Panjang to Pasir Mas alignment and integrate it with the ECRL. So that we can see how we can help provide industry and provide logistics for the halal industry in Rantau Panjang so that it can attract investment to Rantau Panjang. Thank you.
Thank you, Minister. I was interested in the answer given by the Minister regarding the estimated RM2 billion that would have to be added if the ECRL were extended directly to Rantau Panjang from Kota Bharu now. I was also, thankfully, invited to join the Transport Special Select Committee (JKPK Pengangkutan) on a visit recently. And I still remember it was mentioned that if today
they have to spend RM2 billion, if next time they want to do it again it will be higher because they have to rebuild those sites again. So, I want to know, is the ministry aware of the current cost of RM2 billion, and if they want to do it next time, how many billions will be needed? Because we believe this will increase in the future, and the need for us to have a connection with Thailand is something very critical, that is one. Secondly, I commend the Minister's intention to introduce or re-establish a route so that KTMB can become the nerve of the nation that returns to being excellent and glorious. But I think for Tumpat, this is the last station in Malaysia. Something needs to be done, because today two Prime Ministers, one who declared a new bridge from Palekbang to Penambang, which is being built now, expected to be completed in 2027. Another one, the eighth, ninth PM, who declared a bridge from Tak bai ke, Pengkalan Kubor to Tak bai. So, in this matter, there are two bridges that have connected Tumpat with Kota Bharu and also with Thailand. So, if it is not connected with the service, the last railway station in Malaysia is at Tumpat. If there is no major planning, I think this will also be stunted. So, if possible, for all these plans, attention must be paid. Even if it is impossible to connect with the route to Thailand. But as a last resort, something must be done, whether to build a dry port or the like, it must be done, because this is a nerve centre for KTM itself. What is the view of the Honourable Member?
Indeed we want to upgrade KTMB's service system, and KTMB is indeed the main driver in terms of cargo and so on. Those connections we need to look at in terms of their practicality and also in terms of their strategic value. As I said, for example, Rantau Panjang to Golok, we must also understand that the rail system in Thailand, so far, yes. So far they still use, meaning in terms of the track, it is the same as KTMB. So, connecting with KTMB is no problem. Connecting with the ECRL, it is a different gauge. The ECRL is standard gauge, its track is bigger. So, if we want to connect to the ECRL, it requires integration in an area that is more spacious.
So, that is what we are looking at, how to integrate these two rail systems that use different tracks. But we do know that if we want to build the ECRL, and connect to Rantau Panjang and further to Thailand, it must have integration. Perhaps at Pasir Mas and so on. That is what we are looking at. And it is indeed true that we want to ensure that these two rail systems can be connected, because it is not beneficial for the country if we spend so much on the ECRL and it does not connect to the existing rail system.
The same goes for Tumpat, we also have to look at how to connect it with the ECRL so that whatever we can connect and integrate can be unified. Because we know that the existing rail system, firstly, uses metre gauge. Secondly, it is not electrified. And for connections to ports, for example Kuantan Port, Kemaman Port, Port Klang, the ECRL is already there, an existing alignment. So, whatever connections there are, there must be integration. So, including for Tumpat, we must see how to integrate these two rail systems. So, I hope the Honourable Member, we at the Ministry of Transport level, we look— I do not see that because it is in Kelantan, we do not consider it. We consider it from the point of view of the country's strategic interests. And for me, the transport network between Malaysia and Thailand must take into account the connectivity of Kelantan with Thailand. Because that is one of our routes, our gateway. Not only for trains, but also Kota Bharu Airport, I have said recently, that we see Kota Bharu Airport as a gateway airport for southern Thailand. And it would benefit the country if we can attract users or the people of southern Thailand to use Kota Bharu as a gateway. Wherever they want to go, they use Kota Bharu. It can fit into KLIA. If they want to go to Europe, they want to go to Asia, they want to go to Australia, they come here. And Kota Bharu Airport, for the information of the Honourable Members from Kelantan, has already been completed. Right now we are conducting testing. For several nights now, testing has been going on. There is user testing. So, by March it will be fully opened. So,
both phases will be completed and the new and modern Kota Bharu Airport will be usable by users and by passengers. Next, Honourable Tan Sri Mr Speaker, the Honourable Member for Setiu is not here, right? Setiu. The Honourable Member for Setiu debated the issue of road damage and public facilities that were not properly restored after the construction of the ECRL project, which has caused concern among residents. For the information of the Honourable Member, under the requirements for the implementation of the ECRL project, the contractor is obliged to repair roads and public facilities within the construction limit (ROW) that were affected by the construction work before they are handed back to the relevant agencies such as the local authorities (PBT) and the Public Works Department (JKR). Joint inspections between MRL, the contractor and the relevant agencies will be carried out. Work done will only be accepted after obtaining approval from the relevant agencies. So, MRL will ensure that any road damage caused by the contractor must be repaired by the contractor before handover. So, I think there is no problem with that. Only if there are any projects...
Minister, the problem now is that repairs are carried out but not as good as before the ECRL project.
That I cannot comment on.
They are temporary in nature and some get damaged again after being repaired.
Yes, damaged again, we have to look to the JKR. So, the JKR is the agency that will carry out the assessment of whether it can be accepted or not before it is handed back to the government. So, indeed if there are such shortcomings, we will accept them and ask the contractor to rectify them. Regarding the proposal to establish an Integrated ECRL Station at Bandar Permaisuri. We take note of the proposal. However, for the information of the Honourable Member, this integrated terminal falls under the jurisdiction of the state government and the PBT. However, we can cooperate with the PBT or the state government. If there is a parcel of land, there can be cooperation between MRL and the state government. The Honourable Member for Tebrau proposed that KTMB introduce an express route from JB Sentral to KL Sentral, which stops at only six stations. Is Tebrau here? I accept that proposal. Indeed, that is also a
hope of mine. He wants there to be more express services, as we do for the north. For example, Kuala Lumpur–Ipoh, it also has its express services. Only now we want to stabilise our service first, or our services. Right now we are also procuring and receiving new trains. So, once all those trains have been obtained and stabilised, we want to introduce this express route as well. So, there is no problem, I welcome what has been proposed. RAC is also upgrading the infrastructure at Pasir Gudang Station so that KTMB can operate the KTM commuter service on the Kempas Baru to Pasir Gudang route, which is expected as early as the middle of this year. But it requires additional operating costs for KTMB. This is still being studied in detail, what is the best way for us to implement it and the mechanism to implement this KTM commuter service for the Kempas Baru to Pasir Gudang route. Honourable Member for Saratok, is he here? Saratok is not here. Kota Belud is not here. Kota Belud is not here? Okay.
Kota Belud is here.
Sorry, sorry. I did not see, I did not see. Sorry. Kota Belud has debated the need for a complete railway alignment to be built and to be expedited once the study being carried out is completed. For the information of the Honourable Member, at this time the Trans-Borneo Railway Feasibility Study is still being carried out and has not been finalised. Any decision regarding the construction of a complete and integrated railway alignment can only be considered after that study is completed, including assessment in terms of technical, financial, socio-economic and governance aspects, as well as coordination between Sabah and Sarawak. For me as Minister of Transport, I indeed support and I indeed hope that a rail system can be developed between Sabah and Sarawak. Our rail system is mostly concentrated in the Peninsula. As Minister of Transport, I think it would be incomplete if Sabah and Sarawak did not have a rail system. Rail is indeed the transport mode that we hope will become the catalyst for the future. Because most of our movements, we want to encourage the use of rail, that is road to rail, including cargo, including passengers, especially in Sabah and Sarawak because of the long distances and if one drives a car it takes
a long time. So indeed we hope there is a rail system, but this involves quite a large expenditure and investment. So for me at the Ministry of Transport level, after this feasibility study, we will try, if it is found that this study shows it is feasible for us to build a rail system, the Ministry of Transport will fully support seeking allocations from the Ministry of Finance to implement this rail system. Not only for Sabah but also connected to Sarawak. So, this requires close cooperation between the Federal Government and the state governments. Next, Honourable— Tan Sri Mr Speaker, Sanglang Port. Is Padang Besar here? Okay. Padang Besar stressed that the proposal for the development of Sanglang Port should be seen as a project of a scale...
Jerlun, Jerlun. Not Padang Besar. Jerlun.
The Honourable Member for Padang Besar raised this matter. Okay, never mind, I will continue. The Federal Government and the Perlis State Government have given approval to the joint venture company between the Perlis State Government and the private sector to develop the Perlis Inland Port in order to boost cargo activities between Malaysia and Thailand. At the same time, PIP will become a multimodal port to enable regional logistics operations to be carried out efficiently and productively through sea transport and rail mode. The same joint venture company is also involved in developing Perlis Sanglang Port. At the same time, the Ministry of Transport (MOT) takes note of the announcement by the Kedah State Government regarding a proposal from the private sector to also develop a seaport in the Sanglang area on the Kedah side. MOT has not received any comprehensive proposal from the private sector for the purpose of developing a port in that area. Any proposal for the development of the port is still at the conceptual stage. Any consideration of the development of the port...
Honourable Minister, may I have the floor for a moment?
Just a moment, yes. In Sanglang, it must take into account the concept of the activities to be developed as well as sensitivity to local issues. This is because there is a proposal to develop both sides of Kuala Sanglang,
Perlis and Kedah. MOT agrees that the development of the Sanglang area must be seen holistically and proposes that the Perlis State Government and the Kedah State Government hold discussions together so that development proposals are not made in silos.
Honourable Minister, I have stated in my debate that the state government through BPEN has already submitted a proposal as requested by MOT regarding the proposal for a deep-sea port at Sanglang. So, I request information on the latest status of that proposal, whether it has received approval or whether there are any further amendments that need to be corrected. Thank you.
I will say, firstly, if we have a proposal to build, it is not only a matter of policy decision. It also needs to have who or which company is going to develop the port.
Because, as we have said, right now our port development model is all through the private sector. So there needs to be a proposal from a private company together, if supported by the state government, submitted to the Ministry of Transport for us to process it in terms of its operation. But as I said, there are requests from both the Perlis government and the Kedah government at the same time. Surely we cannot build two ports in one area that is very close between Perlis and Kedah. So, it would be better if we can detail it, and discuss between the Perlis and Kedah State Governments so that we can agree on one suitable location in the middle between Kedah and Perlis to see how we can benefit both states. So that is what is needed. So I know there are various proposals, including letters and so on, but there is still no comprehensive working paper from any company submitted to us. So, for Sanglang Port, so far we have not made any decision. But, we can facilitate. Because we are taking an open attitude in port development now. Because most of these ports are implemented through the Private Finance Initiative (PFI). So this is the model for us right now. Including for Pulau Carey, we are considering it through cooperation between the state government and the private sector because that land is not Federal land.
Let us say the land belongs to the state government. The state government may carry out joint ventures or cooperate with any private company and submit a proposal. We will look at it from the technical aspect. There is a technical study, whether the area is suitable or not, and certain technical conditions will need to be determined. So that is our explanation. I hope this can be understood. Next, Tan Sri Mr Speaker. The Honourable Member for Kota Belud debated the issue of boat transport as an important public transport that should be treated like other public transport. For the information of the Honourable Members, the Federal Government takes note of the importance of boat transport as the main public boat transport in Sabah. As a main mode of transport, water transport needs to be given attention and treatment equal to other public transport, especially in terms of safety and infrastructure. In some areas of Sabah, fast boat services, passenger boats and passenger ferries are indeed already operating. Jetty facilities and designated landing points are also provided by state authorities such as the Sabah Ports Board, the Ports Department and the Sabah Board, as well as local authorities. MOT will continue to work with the state government and related agencies to improve existing facilities, strengthen safety aspects, and ensure water transport services in Sabah are strengthened in stages, subject to mutual agreement. Pasir Puteh debated on the importance. Is Pasir Puteh there?
[Speaking without using the microphone] Pasir Puteh is here.
Oh. Sorry. Pasir Puteh debated on the importance of developing the Tok Bali Port, which has great potential. For the information of the Honourable Members, in principle, MOT has no objection to the implementation of infrastructure development projects that can contribute to socio-economic growth. MOT encourages investment and private sector participation in port development, including the proposal to upgrade the Tok Bali supply base to a full-fledged port. Although every port development proposal has the potential to bring benefits to the country and the state concerned, such proposals also carry the risk of becoming a 'white elephant' project that damages the reputation
of the government if the implementation plan is imperfect or the port's operation is not financially sustainable. Accordingly, every port development proposal must be supported by a comprehensive feasibility study and detailed analysis. MOT is ready to assist the state government in any strategic effort to strengthen the industry and economy of the state. So regarding the supply base, I think if there is a private party who wishes to invest, we can facilitate it. That is not a problem. As I said, the model for ports that we use across the country is more towards private sector investment, yes.
YB Menteri.
I think it is quite difficult for the government to develop these existing ports, and indeed the private sector is encouraged to participate in this port sector.
YB Menteri.
Ya.
Kota Belud. Regarding my proposal that we need to pay attention to water transport, meaning boats. But the Honourable Minister, if possible, I also ask the ministry to look at areas whose population may be small but which really depend on access by water. For example, in my area, such as Pulau Mantanani. And most of the water transport needed in Sabah, meaning such facilities, are in areas where most of the people are from the B40 group.
[Bangun]
[Bangun]
So I hope the Ministry of Transport, although perhaps the place does not have many residents, should still be given attention as public transport and to connect them to the mainland. Thank you.
Menteri. Cuma.
Thank you. Let me explain. First, regarding this boat.
Honourable Minister. A little on what Tok Bali said just now.
Wait, wait. I will answer Kota Belud first.
Okey, okey.
Regarding this boat, we can encourage the private sector because the ministry does not function as an operator. We do not provide the service. Because we facilitate the service, license operators and so on. So we understand that for areas that may have few residents, it is not economical for the private sector to invest. If there is a social need and so on, that can be discussed. Perhaps the state government, through the Sabah State Government, needs to look at whether these uneconomical areas can be given assistance, for example, fuel subsidies and so on. Because the biggest cost in providing this service is fuel. Apart from investment in buying boats and so on, fuel cost is the highest. So in matters like that, we can help by providing additional subsidies to these operators. But for the government to provide the service as the operator is quite difficult. So I think we do not have such a service model, but we encourage private companies to operate such services with assistance from the government.
[Bangun]
Thank you for the Minister's answer. I understand the financial constraints of the government. However, at Tok Bali Port, as far as possible, there should be government intervention in several sectors so that— because government involvement can smooth the process. If it is from the private sector, I understand. But they sometimes have their own rights, all sorts of things from the private sector, because they focus on their own business compared with the government. So, is the government entirely without allocation for the basic needs at Tok Bali? Thank you.
Yes. Firstly, Honourable Member, Tok Bali does not have a port authority anymore. It is not under any port authority.
It is different from the existing Federal ports. So Tok Bali may be under the Marine Department. I, I think I am right. So if we look at the existing jetties, whether they are operated by the Marine Department or not, I am also not sure. I have to check, double check Tok Bali in terms of that fact. But as far as I know, it is not under any port authority. So to develop it as a port, firstly it certainly needs a large injection of capital. And this can only be implemented if there is investment from the private sector. For example, for the supply base model. Let us say there is an oil well outside the waters of Kelantan, it needs a supply base. Because the supply base is one of the main activities for a port like Tok Bali. So, if, if what was said earlier is correct, there is already a supply base operation there. But perhaps it needs to be expanded. So that is something we can discuss in terms of how to attract investment companies or private company investment. Because usually, the development of these authorities, we want to encourage the private sector to do it. Not the government doing it, because they run business there. We can facilitate in terms of facilities. Perhaps in terms of some facilitation we can help. But we do not want there to be, to be the same mistakes. Previously in Bintulu, the supply base was a project that failed. It used financing from the port authority. If we had not looked back at that project, the project would have failed and would have taken most of the revenue of the Bintulu Port Authority. Fortunately, we reviewed it, so that the implementation model must be operated by private companies. They take the risk, because if they want to do business, they must take the risk to invest, and the government needs to facilitate. If we build an authority or a port facility for a supply base and people come, but if they feel they no longer have any interest, they leave the place. So it will become a loss to the government. So the model we want to adopt is that if you have a commitment to build facilities, build amenities, we will facilitate.
We give a long period, for example if there are places that may need to be given concessions. Long concessions, perhaps 30 years, 40 years, for
them to recoup their investment. So, such a model, we at the Ministry of Transport level support it because it does not bring risk to the government. What we worry about is that every time there is a request, let us say a request to build a jetty, build a port and so on, if there are no users. So it will become a white elephant. This is what happened to many of our marinas. Now the Marine Department has several marinas on islands around the Peninsula that have been abandoned. The government has built all this marina yacht. It became abandoned because there is no operator, no users. This is what causes losses to the country and is subject to audit. I give the floor to Jelutong.
Thank you, Honourable Minister. I just want to take this opportunity to discuss the ferry matter earlier. Kota Belud discussed ferries earlier to record a word of thanks as Chairman of the Penang Hindu Endowment Board. Where, in conjunction with the Thaipusam festival, not only this year, but since the Honourable Member became Minister, free services have been provided to all Hindu devotees in Penang, using not only ferry services but also Rapid Bus services. I take this opportunity to extend a thousand thanks to the government, the ministry and the Honourable Member himself. Thank you, Honourable Member.
Setiu, a little. I raised the issue of the ECRL earlier. I will give an example, in Setiu, behind the Ibrahim Fikri Secondary School in Setiu. The issue now is that the road used by lorries carrying loads, lorries carrying stones to go to the ECRL Project. So that road is damaged, full of holes, cracked. When we complained to the construction party, CCCC, and also MRL, they said they could not repair it because it was not caused by building the track but by the lorry route, and there must be photos of the lorries passing. So indeed, we did not take photos. This, these issues must be handled by the ministry. Secondly, as I mentioned earlier. The Federal Road at Sungai Bari, Langkap. The road was damaged due to the ECRL Project. When they built the flyover over the Federal Road earlier, the road was damaged and we have complained to MRL and CCCC for repair. When repaired, because the repair was not perfect, the road was damaged again. So, according to the Minister's answer earlier, the task of repairing this again is under the JKR. So, I think it is not under the JKR, it is under the contractor involved. Thank you.
Minister, please, one more.
I did not say it is under the JKR. I said the assessment is done together with the agencies before it is handed back. Of course the contractor has responsibility. So, if there are problems that are mentioned, I will ask officers from MRL to look, to ensure that any road areas that are damaged, before it is handed back to the local authority or the state government, the road must be repaired before it is handed over. I did not say the responsibility lies with the JKR, no. The contractor must repair before handover, but the assessment of whether it can be accepted or not, that is for the JKR to check. If they are satisfied and can accept it, of course, on behalf of the contractor, after handover to the agency, of course, they will wash their hands of it. They cannot say, "I have— I have handed it to the agency, after that, it got damaged again. It is the contractor's fault again." Of course they cannot, it is not fair to the contractor. So, before handover, it is indeed the contractor's responsibility. They must settle these damaged roads before handover. Yes, last, Jerantut.
Menteri, last.
Thank you, Honourable Minister, thank you, Tan Sri Mr Speaker. The most important issue is regarding the establishment of the Malaysia Transportation Safety Board (MTSB) that we have discussed and debated last year. So, is there any light that it will be established this financial year?
This is indeed what I wanted to— the next thing I want to state. Regarding the current status of the establishment of the Malaysia Transport Safety Board, or MTSB. For the information of the Honourable Members, the Cabinet has considered the Cabinet Memorandum and agreed in principle to the establishment of MTSB. The Cabinet has agreed. The establishment of MTSB requires the enactment of a specific act as the legal basis. Accordingly, the establishment work is being finalised through engagement with various related ministries and agencies. In terms of the principle for its establishment, the Cabinet has agreed. Now we have to draft the Bill to be brought to the Dewan Rakyat. That process is ongoing. But of course the challenge for us is how to integrate, or we restructure the roles in
several related agencies. For example, MIROS, the Marine Department and so on, and also CAAM, which has its own, and also the (BSKU) Air Accident Investigation Bureau. All these need to be re-integrated. The government's position, the JPA's position, is not to involve a large increase in numbers. So, that becomes a challenge for the establishment of a new body because right now the JPA wants to control the increase in the number of positions. So, we want to minimise this increase so that the financial implications can be reduced. So, that process is ongoing and of course we need to bring it to the Dewan Rakyat, and I expect it will be tabled in the Dewan Rakyat in the second meeting this year, which is in June. Tan Sri Mr Speaker, I know my time is up. There are several other Honourable Members whom I did not have time to answer. I will ensure that these written answers can be delivered to the Honourable Members within a week.
Lima hari.
Five days, as directed by Tan Sri Mr Speaker. With that, once again I thank all the Honourable Members who have debated matters relating to the Ministry of Transport. The Ministry of Transport will always be open to receiving views and suggestions. And we always work together with all parties so that transport facilities are brought to the people, so that the welfare and progress of the country can be achieved. Thank you.
Alright, thank you, Minister. Honourable Members, the sitting today is adjourned until 10 a.m. on Thursday, 5 February 2026. Thank you, Assalamualaikum warahmatullahi wabarakatuh and good night.
[The House adjourned at 6.26 p.m.]
Special ChamberSpecial Chamber
[Mr Syahredzan bin Johan [Bangi] presided over the Sitting]
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Application for special allocation for repair, rehabilitation and upgrading of infrastructure facilities in the JPS Perlis Floating Market agro-tourism areaSpecial Chamber
Thank you, Mr Speaker.
The Department of Irrigation and Drainage (JPS) floating market has been operating for seven years since 2018.
Sorry, Honourable Member, you have to stand up.
Sinking. Thank you, Mr Speaker. The JPS floating market has been operating for seven years since 2018 and has become a main attraction for local and foreign tourists. However, several key infrastructure components have suffered damage or wear due to weather factors, continuous use and the building's long age. The main objective of the project is to improve safety. It is to ensure that all facilities, especially the wooden bridges and commercial boats, are in a sturdy and safe condition for use by visitors and traders.
Beautifying the aesthetics. It is to upgrade the gateways and floors of the commercial areas to enhance the overall image of the floating market as an attractive and modern tourist destination while maintaining its natural or organic concept.
Strengthening the economy of entrepreneurs and domestic and international tourism. It is by providing more stable and comfortable business premises or boats, which in turn supports improved service quality and sales by the 10 existing entrepreneur units.
Long-term sustainability. It is by changing the floor structure under the tent, which is the area used as a dining and resting place by visitors, from premix to more durable, easily maintained and environmentally friendly interlocking.
Next, in terms of the scope of work and justification. Upgrading the main gateway. Cost approximately 10,000. The existing gateway is outdated and does not reflect the image of an iconic agro-tourism area. It will have a strong visual impact on visitors.
Repairing the boat business premises, 10 units. Cost approximately 12,000. The boats used as floating sales premises, which are also a main icon of the floating market, require structural and cosmetic repairs to ensure stability and safety. In addition, it gives an attractive and tidy appearance.
Upgrading the floor of the commercial area, interlocking. Cost 60,000. The existing premix floor under the 60 x 40 halfmoon tent has been damaged and is uneven.
Changing to interlocking paver is a sturdier solution that prevents water from pooling and growing moss.
Repairing and upgrading the wooden bridge, cost 18,000. The 50 x 5 wooden bridge between the islands is an important route. Damage to the wood or structure poses a high risk to visitors. Thorough repair is mandatory to prevent accidents. Estimated cost RM110,000.
So, the long-term impact and ROI. First, the increase in tourists. Efforts to attract tourists can make the JPS floating market the best tourism product and an alternative to the floating market in Hatyai, Thailand.
Second, the economic stability of entrepreneurs. The increase in tourists will indirectly strengthen the income of local entrepreneurs and create new employment opportunities.
In conclusion, this project is viable and capable of bringing substantial returns to the state government through agro-tourism activities. Perlis will also become a state that will be visited by local and foreign tourists. Thank you.
Thank you, Honourable Member.
I ask the Honourable Minister to respond. Honourable Member.
Thank you, Mr Speaker. Thank you, Honourable Kangar, for your very deep concern for the area and the infrastructure that has the potential to become a focal point for visitors in the Honourable Member's parliamentary constituency.
Your effort in examining this project down to the level of background, objectives, scope of work and cost estimate is greatly appreciated.
The Ministry of Tourism, Arts and Culture (MOTAC) has noted the Honourable Member's application for an allocation totalling RM110,000 for repair and upgrading work on facilities at the JPS Perlis floating market. However, every proposal put forward by the Honourable Member must first be discussed with the local authorities (PBT) and obtain approval from the state government.
After that, a complete application can be submitted to MOTAC through the State Economic Planning Division for processing and
raised for consideration and approval by the Ministry of Economy. In other words, Honourable Member, applications for projects like this across the country come from state governments through their respective State Economic Planning Divisions. Therefore, the Honourable Member may discuss with the PBT and also the state government to bring this project up to the approval stage by the Ministry of Economy. That is all, thank you.
I invite the Honourable Kangar to ask a supplementary question.
Thank you, Honourable Deputy Minister, for the answer which seems interesting regarding the activities to develop tourism in the state of Perlis. So although this floating market is under JPS (Department of Irrigation and Drainage) and run by a cooperative, it is still a new tourist destination for Perlis. And once again I mention that if possible we want to encourage domestic tourists to go to Perlis, because now people have seen Perlis. Now people have seen Perlis. If you look now, many vehicles are heading to Perlis to enjoy food and so on in the state of Perlis.
And my question, my supplementary question, is what efforts the ministry is making to attract cross-border tourists, Thai tourists, to the state of Perlis. Later we want Thai tourists to come to Malaysia as well.
Not Malaysia to Thailand. From Thailand to Malaysia.
And secondly, when will efforts be made to improve the infrastructure at Pulau Ketam, Kuala Perlis, Perlis? Thank you.
Right, the Honourable Minister has two questions.
Okay. Thank you for the questions asked.
I will answer the second part first. It is related to infrastructure as well. So, MOTAC always works together with every state government, including the Perlis State Government, to upgrade tourism, cultural and arts infrastructure facilities.
During the Twelfth Malaysia Plan, the Federal Government through MOTAC has implemented a total of 36 development and maintenance projects in the state of Perlis at a total cost of RM26.7 million. So, MOTAC suggests that the Honourable Member discuss with the Perlis State Government so that these projects can be proposed for implementation under the upcoming RPs under RMK13.
Regarding the government's efforts to attract more visitors from Thailand, I understand the views of the Honourable Kangar because I am also from Miri, a city that borders Brunei. So, I understand. This is something very important for us to promote Perlis as a fairly strategic state because it is an important destination for Malaysia through the ETS service from Padang Besar to Kuala Lumpur.
That is to say, Perlis plays a very important role as a place for us to connect from Perlis all the way to Kuala Lumpur. And indeed many programmes have been and will be organised as part of the campaign
Visit Malaysia 2026. Among the programmes that are very important and close to the people of Perlis is the Pesta Angin Timur.
We will also organise and promote Citrawarna Perlis 2026 and the Perlis International Aqua Festival 2026 to international visitors, especially from Asian source markets, and I believe that with the cooperation of all parties, MOTAC always welcomes cooperation from all parties, from state governments, local agencies, PBT and also all industry players, so that together we can make the Visit Malaysia 2026 campaign a success. That is all, thank you.
Thank you, Honourable Minister.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Providing an Exit Road to Iskandar PuteriSpecial Chamber
Honourable Member, please.
In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Mr Speaker, the title of this motion is “Menyediakan Jalan Susur Keluar ke Iskandar Puteri”.
There are complaints from residents around Taman Bukit Indah, Johor, who need an exit service road from Jalan Ceria, Taman Nusa Indah to Iskandar Puteri or E3, based on the following reasons.
(i) there are more than 50,000 residents around Taman Bukit Indah who need this service road;
(ii) there are many workers in Singapore who live in nearby housing estates and need this service road;
(iii) it exposes the risk of road accidents as many motorcyclists use the opposite lane at the entrance road to Jalan Ceria to head to Iskandar Puteri because there is no such service road as mentioned earlier;
(iv) the Pontian–Johor Bahru Parkway is the main road leading to Iskandar Puteri, Pontian, Singapore and Kuala Lumpur. Thousands of vehicles a day need this service road;
(v) there are patients and workers at the private hospital because the area is a medical area, and schoolteachers around Bukit Indah need this service road to return home;
(vi) the absence of a service road has added to vehicle congestion in the surrounding area because vehicles that want to exit to the Pontian–Johor Bahru Parkway have to
enter Taman Bukit Indah first to exit to the main road;
(vii) a reserve has been provided for the construction of this service road. Therefore, the construction of this service road does not require a large cost; and
(viii) with the completion of the RTS on 31 December 2026, there will be an increase in population in this area.
The absence of this service road will cause difficulties for local residents.
Pulai requests that the government direct LLM to build a service road to Iskandar Puteri. That is all, thank you.
Honourable Minister.
Mr Speaker and Honourable Pulai.
Indah bunga semerah saga, (The flower is bright, as red as saga,) Malang selasih layu terkulai; (Sadly the selasih wilts and droops;) Ucapan dua dan ucapan tiga, (Speech number two and speech number three,) Terima kasih YB Pulai. (Thank you, Honourable Pulai.)
For the information of Honourable Pulai, the Nusa Idaman Interchange (Exit 308A) on the Malaysia–Singapore Second Link Expressway (LINKEDUA) is an interchange built by a third party, namely BNDSB or Bandar Nusajaya Development Sdn. Bhd..
The earlier application to build this interchange, which aimed to connect the Medical Park to the LINKEDUA Expressway, was submitted by BNDSB and received approval from the Ministry of Works. The construction of the interchange was carried out entirely by BNDSB and was completed and obtained its Certificate of Completion and Compliance (SKP) on 24 December, a long time ago, 2010.
Based on the development proposal by BNDSB and taking into account the traffic movement patterns and traffic projection data, the interchange was designed and approval was given to the detailed design drawings using the concept of a partial diamond interchange type, namely a three-legged partial diamond interchange, with permission.
This design was specifically planned to meet the traffic movement needs to and from the Medical Park development to the LINKEDUA Expressway. Development around the interchange, including on Jalan Ceria, had still not been implemented at that time. In addition, the choice of this interchange design was also based on the application and decision of the developer, taking into account current traffic operational needs and the construction cost considerations compared to building a full diamond interchange.
Then, based on the technical evaluation carried out at that time, the proposed design was adequate to support traffic operations
in the Medical Park development area and complies with technical requirements and the design guidelines in force. However, there was a proposal from the developer and the state government to build the service road in question to complete the design of the interchange into a full diamond interchange. The LLM highway and the PLUS highway project have no technical obstacles.
Mr Speaker, what exists now is the half diamond. [While showing a photograph] Half diamond. What Honourable Pulai requested, the one in red, he wants it added there. I see. Now what exists has been completed, this is already done. This is the actual road. He wants an addition there so that it becomes a full diamond, a full diamond interchange. That is what it means.
Mr Speaker, if you can see this picture, then you will understand, yes.
It's simple. That is what he asked. That line there. Wow, he has— yes. He appears very determined. Of course, to solve the problems of our people, one has to be determined.
We have no technical obstacles. The implementation of the construction of this service road is subject to the submission and approval of the Traffic Impact Assessment (TIA) report, with permission, and the Road Safety Audit (RSA) report for detailed technical evaluation as well as compliance with current requirements and guidelines.
Developers and also the state government may submit an application to build this service road to the Malaysian Highway Authority (LLM) through the Highway Roadside Development System (e-PTL). The Highway Roadside Development System is for consideration and approval by the YAB Minister of Works. All costs of construction and operation of this service road are fully the responsibility of the developer. Thank you.
Thank you, Honourable Minister. I invite the Honourable Pulai to ask a question.
Thank you to Mr Speaker. Thank you to the Deputy Minister. In the answer just now, it means the responsibility lies with the developer. So now, the developer has completed the project. That means they have finished their job.
So in terms of objective, any developer who wants to build this service road does so for the purpose of boosting sales. Now the sales are finished. There is nothing left to sell. So, surely the developer will not easily be willing to release capital to build a service road.
Yet before that, there was no agreement, first.
Secondly, I also want to criticise a little the Planning Permission issued previously. Here is the road, yes.
[While showing a photograph] To get the full diamond just now, there is a land, Lot 111909 here, this is the developer's land. It should have been handed over to the government when the Planning Permission was issued first. Now this lot has not been handed over to the government.
Then, we also do not know who the developer is that will build it.
So with that, I am of the view that the developer's duty is finished.
So now, we as leaders, bring the aspirations of the people, yes. Here I show this, this is what they want.
[While showing a copy of a document] This
is the sincerity of this Deputy Minister. They are sincere, they showed me this, they held a signature drive to state the importance of the service road.
There the population is large. So, they have no way out. If they want to exit, they have to go around in Taman Bukit Indah. So, even more congestion occurs.
So in Pulai's view, the time has come for the government's responsibility to meet the needs of the people there by building a full diamond service road in this area. We seek the government's views.
YB Menteri.
Mr Speaker, this is a layout plan of the entire development in question. [While showing a photograph] This one asks for an additional service road. Here there is still vacant land. Vacant land up to here. A new developer has sent a letter to develop the site. So, there are two methods now.
First, for the Planning Permission for this new developer, we must impose a condition that they must build that service road.
Second, if they say they will not proceed, for example, or the cost is high, or they have to buy the old developer's land and so on, then the next method that the Honourable Member needs to take is that here we can send the Honourable Member's application to the state government, because this road is a PBT road, a PBT road. This PBT road is under the responsibility of the state government.
So we, my officers behind me, will prepare a letter stating that this is the Honourable Member's application to UPEN, representing the state government, so that this matter is done through other allocations, other allocations. Allocations to the state government given by the Ministry of Finance in the annual budget. Ha, that's right. So far there is none. We can include it in the RP2.
At the same time, the Honourable Member also has to do something. So that the letter from us is one, and the letter from the Honourable Member is two. So that it is stated that the old developer has completed its duty. The new developer still cannot see light at the end of the tunnel. Therefore, in the Honourable Member's view, it needs to be implemented by the state government through a service road project by the Federal Government. That is my view to the Honourable Member. Thank you.
Thank you, Honourable Minister.
Terima kasih.
Special Chamber — Speeches under Motion regarding Matters of Government Administration (S.O. 17) — Upgrading the Road and U-Turn Overpass of Kempas Baru Road, Tampoi, Johor BahruSpecial Chamber
Honourable Member, please.
Okay, thank you, Mr Speaker.
The next is a motion titled “Menaik Taraf Jalan dan Jejantas U-Turn Jalan Kempas Baru, Tampoi, Johor".
Mr Speaker, there is an urgent need to upgrade Jalan Kempas Baru (J3) over a distance of 3.5 kilometres to its junction with the Pasir Gudang Highway (FT17), the need for a U-turn overpass and the provision of a road divider, because the road has only one lane and no road divider. The reasons are as follows:
(i) there is traffic congestion during peak hours on Jalan Kempas Baru from the direction of Taman Setia Tropika;
(ii) there is congestion on Jalan Kempas (J3) in front of Epson Precision (Johor) Sdn. Bhd. from the direction of Jalan Datin Halimah;
(iii) based on statistics, there have been many accidents in the area. In 2022 there were 299 cases; in 2023, 295; in 2024, 355; and in 2025, up to November, 370 accidents in the area. Of this total, there were two fatal accidents in 2022, five fatal accidents in 2023, three fatal accidents in 2024 and three fatal accidents in 2025. Some of them are caused by narrow roads and the absence of a road divider. I will show the photographs again, yes. Here is a photograph. [Showing a photograph] Road accident. This lorry, two lorries hit a car until the car was crushed right in the middle. This is Jalan Kempas Baru, yes. Likewise this car.
[Showing a photograph] When it rains the road is slippery, there are many vehicles, and it hit the divider at the side there. So, these are examples of the accidents that frequently occur in the area I am referring to, yes;
(iv) with the completion of the RTS project on 31 December, this area is expected to experience increased traffic congestion and will affect local residents; and
(v) Kempas KTM Station has been completed and is functioning well.
There are many users of KTM services from outside who use this Jalan Kempas Baru.
Therefore, the Pulai Parliamentary constituency requests that the government approve the project mentioned above. Thank you.
Thank you. The Honourable Minister.
Mr Speaker, thank you, Pulai. For the information of the Honourable Members, Jalan Kempas Baru is divided into two sections, namely:
(i) the section from Larkin to the Datin Halimah interchange, under the supervision of the Public Works Department (JKR) of Johor State; and
(ii) the section from the Datin Halimah interchange to the Setia Tropika junction, under concession
PLUS under the supervision of LLM and the project is a concession company.
Projek Lebuhraya Usahasama Berhad (PLUS) is responsible for maintaining the road in question, which is among the scope stipulated in the PLUS concession agreement signed between the government and PLUS.
The road from the Datin Halimah interchange to the Setia Tropika junction was built with a two-lane two-way design, or single lane per direction, and there is also a portion of the said road that has four lanes two-way. There are access points in and out of the developments along the said road, in addition to four traffic light junctions, namely:
(i) the Setia Tropika traffic light junction;
(ii) the Jalan Permatang traffic light;
(iii) the Pasir Gudang Highway traffic light; and
(iv) the Kempas Baru traffic light.
Based on the current trend of traffic flow along the route in question, congestion is found to occur at the traffic light junctions at Jalan Permatang and the Pasir Gudang Highway. In addition, the number of vehicles using this route has increased, so the issue of congestion has arisen.
For the information of the Honourable Members, the upgrading works at the traffic light junction at Jalan Permatang were completed on 12 June by Keretapi Tanah Melayu Berhad to reduce congestion. The scope of the upgrading works involved widening the entry and exit slip roads at the traffic light junction to facilitate traffic flow to Kempas Baru KTM Station.
For the information of the Honourable Members, under the concession agreement signed between the government and PLUS, it does not involve the implementation of road upgrading works. Therefore, the government would have to bear the cost of such upgrading works should there be a need to widen the road based on the existing configuration, and this would have financial implications for the government.
However, there is good news for the Honourable Member. The Ministry of Works has received feedback from the Iskandar Malaysia Development Authority (IRDA) that IRDA is in the process of submitting proposals for new projects for the Second Rolling Plan, RMK13, to the Ministry of Economy.
This is for the upgrading works of Jalan Kempas Lama and Jalan Kempas Baru, which also involves a portion of the road under PLUS supervision. This project proposal has been presented to the Chairman or Exco of Johor Public Works, and has been presented to UPEN, and has received related support. Thank you.
Thank you, the Honourable Minister. I invite the Honourable Member for Pulai to ask the question.
Thank you, Deputy Minister, for the answer, and I feel there is a ray of light ahead. However, my question is this: when we upgrade it, it must have a divider to prevent accidents, like the road between Batu Pahat and Parit Raja and Ayer Hitam.
At the initial stage, there was no divider, and many accidents occurred.
So, when we upgrade, it must mean there is a divider in the middle, because on the right and left there are many villages. In terms of the plan submitted under the Thirteenth Malaysia Plan which was presented by the Minister just now, does it include the U-turn overpass as well?
If not — if there is a U-turn overpass there, it means we can solve the congestion problem in front of Epson as well. It means the entrance road to what's it called, Pasir Gudang, we can close it and they can make a U-turn in that area, avoiding congestion along Jalan Kempas, yes.
That is the first one.
The second one is in terms of the government's own view. Just now, the view of us in Pulai and also the view of the residents, yes. In terms of the government's view, has the time come for this area or Jalan Kempas Baru to be upgraded? I would like to have — perhaps the government has already carried out an assessment of that area, that area? In terms of the government's assessment, does this area really need upgrading to make things easier for residents in the surrounding area? Thank you.
The Honourable Minister.
Thank you, Pulai. We have obtained feedback from IRDA when we were preparing to answer this question, and the title given with additional information provided by IRDA is "Upgrading of Jalan Kempas Lama and Jalan Kempas Baru, Johor Bahru". Listen to what the scope of this project is.
First, preliminary works. Usual things, topographic survey, soil investigation, utility mapping detection, detailed design. There is also land acquisition. Preparation of plans, payment for land acquisition. That is one matter.
Sometimes what delays it is this.
What are the construction works? First, utility diversion. Building a flyover interchange. Yes, this one. At the junction of Jalan Skudai, Jalan Kempas Lama, Jalan Sutera. Then, upgrading Jalan Kempas Lama from two-lane two-way to four-lane two-way. From the Jalan Skudai junction to the Persiaran Bukit Kempas junction over a distance of 1.8 kilometres. Next, building an interchange. Another at the Jalan Kempas Lama–Jalan Kempas Baru junction.
Next, upgrading. The Honourable Member asked for upgrading. Jalan Kempas Baru from two lanes to four lanes two-way. From the Taman Setia Tropika junction to the Pasir Gudang Highway junction, a distance of 3.5 kilometres.
After that, widening of the bridge crossing the railway line. Next, building an interchange at the Jalan Permatang junction. Next, building an interchange at the Jalan Kempas Baru–Pasir Gudang Highway junction.
So, this is a complete effort made by IRDA. Complete, it really is complete. The cost is not mentioned here, I think it is hundreds of millions. Many millions, yes, many hundreds of millions.
[Interjection] Yes?
[Interjection] They have requested this from the Ministry of Finance. The Ministry of Finance through the budget. Through the annual budget, that is, the annual budget of next year because it is RP2.
So, the outcome of this project is increased investment. That is why it is the JSSEZ area. Yes, that is important. Johor–Singapore Special Economic Zone.
Then, integration between development zones, efficient access to strategic industrial non-logistic areas, employment opportunities for local people. All these good things.
It is expected that SST will negotiate, the design consultant, we have the dates here. We hope that within 36 months once determined, the expected completion in 2028 will be completed. And hopefully this matter becomes a reality for the benefit of the people. Not only the people of Pulai, but for the people of Johor and also those who work in Singapore. Thank you.
Thank you. I request the Minister of Works to support the proposal from IRDA.
Okey.
Thank you, the Honourable Minister. Honourable Members, with that, the sitting of the Special Chamber today is concluded. The Special Chamber today is adjourned until Thursday, 5 February 2026, at 2.30 pm.
[The Special Chamber was adjourned at 3.05 pm]