Dewan Rakyat · 11 November 2026
15th Parliament, session 5, meeting 3 · not final · 519 turns · 45,256 words · official PDF ↗ · Digital Hansard ↗
(Opening)
[Mr Speaker presided over the Sitting]
Oral QuestionsQuestions
Peace be upon you, God's mercy and blessings, and greetings of well-being. Good morning, all Honourable Members. Before we begin with the Oral Questions for Answer, I wish to inform you that tomorrow, for the Ministers' Question Time on 12 November 2026, the questions will be answered by the Right Honourable Prime Minister himself. So, Honourable Members may prepare their questions accordingly. Alright, I begin by inviting Dato' Mohd Isam bin Mohd Isa, Tampin.
Tampin question number one, Welcome back Bossku.
1. Dato' Mohd Isam bin Mohd Isa [Tampin] asks the Minister of Energy Transition and Water Transformation (PETRA) to state the latest achievements of the Solar ATAP and SuRIA Home Programmes, including the number of households that have joined them, and the ministry's measures to expand access for the B40 and M40 groups through rebates, rental schemes or easy financing without high upfront costs.
Alright. Minister, please.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, God's mercy and blessings. Thank you, Honourable Member for Tampin. Tan Sri Mr Speaker, for the information of Honourable Members, the Solar ATAP Programme was launched on 1 January 2026 and implemented openly without a specific quota, to enable users
domestic, commercial, industrial and other categories to install solar systems for their own use. As of 15 September 2026, a total of 24,291 Solar ATAP applications with a capacity of 391.85 megawatts have been approved, compared with 30 April 2026, when the approved capacity at that time was only about 135.92 megawatts. This means that the approved capacity increased by nearly 190 per cent within a period of 4.5 months. To enhance the capacity of domestic users, the government introduced SuRIA Home with an allocation of RM150 million. Through this programme, eligible users may receive a rebate of RM600 for every one kilowatt, up to a maximum of RM3,000 for a five-kilowatt installation. The programme targets between 45,000 and 50,000 households until the quota of 250 megawatts is fulfilled, and it will end on 31 December 2026. As of 15 September 2026, a total of 12,374 domestic users have received rebates amounting to RM36.2 million. Apart from direct rebates, users also have the option of obtaining solar installations through market financing options such as solar leasing or rent-to-own, which can reduce the need for initial capital. Such options can help expand access to households that are constrained from paying the full installation cost in cash. To ensure that the benefits of the energy transition can be extended to the B40 and M40 groups, PETRA will continue to evaluate the performance of Solar ATAP and SuRIA Home, the installation cost structure and also suitable financing options. Any improvements will take into account the effectiveness of assistance, the government's fiscal capacity, and the need to ensure that benefits are channelled transparently to eligible users. PETRA will also continue to work with relevant agencies, utilities and industry to facilitate the installation process and to raise users' awareness of the financing options and solar business capital available. Thank you, Tan Sri.
Alright, I invite Tampin for a supplementary question.
Thank you, the Right Honourable "Prime Minister". The SuRIA Home Programme will end on 31 December 2026 or when the capacity quota reaches 250 megawatts. This period, which is getting closer to its end, has raised concerns among users who have already made installation deposits,
signed agreements and obtained approval, but at the same time, the installation process is still not fully completed. My supplementary question to the Right Honourable Minister is, does PETRA intend to extend the implementation period of the SuRIA Home Programme beyond 31 December 2026, and what guarantee does PETRA give to those who have already obtained Solar ATAP approval but whose installation process is still not completed when the rebate programme ends? Thank you, Tan Sri Speaker.
Silakan, Menteri.
Thank you, Honourable Member for Tampin. Tan Sri Mr Speaker, if we look at our National Energy Policy, we look at three trilemmas, namely security of supply, affordability in terms of cost, and also protecting our environment. Solar is one of our plans to green our energy supply. However, because solar is intermittent, meaning that energy is only available when there is sunlight, it only provides about three to four hours of energy during the day. That is why we also introduced BESS (Battery Energy Storage System).
[Bangun]
And for that reason, for the Solar ATAP programme that we want to introduce, God willing, we will evaluate and see how we can improve it, or otherwise extend it next year. Regarding SuRIA Home, we still have a balance of RM90 million. So, we will certainly continue it. For those who have applied and been approved, they will be able to proceed with their solar installation, on the condition that the solar installation must be completed by March next year, and they will still receive the rebate that has been decided by the government. Thank you.
Alright, I invite Padang Terap.
Thank you, Tan Sri Mr Speaker. Right Honourable Minister, some users who install the Solar ATAP Programme or home solar are exposed to unregistered system installers and may be exposed to price manipulation by suppliers or installers. They face the risk of installers raising prices, and also these installers are not registered.
So my question is, what protection mechanisms does the government provide to users against unregistered installers? Will
the government provide lists of installers certified with reference prices, or complaint channels if there are complaints about installers who manipulate, manipulating the price of the solar system? Thank you.
Baik, Menteri.
Thank you, Honourable Member for Padang Terap. Indeed, installation should be carried out by a qualified and registered party. For that reason, if Honourable Member encounters such a problem, you may refer it to us so that we can carry out an investigation. Something— how do we guarantee that the solar installation is safe and so on. That is why it is very important that anyone who wants to install must refer to the ministry, refer to TNB or the Energy Commission (Suruhanjaya Tenaga) so that they will not fall into the hands of those who manipulate, whether in terms of quality or in terms of price and so on. We indeed want to encourage that installation must be done by those who are registered, because safety features are very important when solar is installed, and the house's location must be safe in terms of compliance, in terms of standards and so on. Thank you.
Alright, next I— Dato' Haji Wan Hassan bin Mohd Ramli, Dungun.
Peace be upon you, God's mercy and blessings. Thank you. Question number 2.
2. Dato' Haji Wan Hassan bin Mohd Ramli [Dungun] asks the Minister of Works to state the latest status of the proposed East Coast Expressway Phase 3 (LPT3) construction project through privatisation under a public-private partnership, and when the Request for Proposal (RFP) document will be finalised and brought forward for consideration by the Cabinet.
Silakan Menteri.
Yes, Tan Sri Mr Speaker. For the information of the Honourable Member for Dungun, the Ministry of Works is concerned about the development needs of East Coast Expressway Phase 3, which will complete the existing East Coast Expressway network, namely LPT1 and LPT2. The development of this expressway aims to provide a more comfortable and efficient transport network, and at the same time enhance connectivity between three states on the East Coast, namely Pahang, Terengganu and Kelantan.
Accordingly, the ministry has carried out a preliminary study to assess the suitability of developing LPT3 by taking into account various aspects including traffic flow, socio-economics, environment, technical and engineering. This study aims to identify the most suitable and viable alignment by taking into account the interests of users and the impact on the areas involved. From the technical and engineering aspects, the selection of the alignment also took into account safety factors, suitability of the construction site, risks of natural disasters such as floods, landslides, geological conditions and soil stability. This consideration is important to ensure that the expressway development can be implemented safely, sustainably, and with minimal risk to users and the environment. Based on the results of the preliminary study, the proposed LPT3 alignment that has been identified starts from Kampung Gemuroh, Terengganu and ends at Tunjong, Kelantan, with an estimated total alignment length of 122 kilometres. For the information of Honourable Members, the government has decided that the proposed implementation of the East Coast Expressway Phase 3 Project be carried out through privatisation using the public-private partnership approach, and this proposal will involve a competitive bidding method or request for proposal (RFP) with the permission of the House, where the development cost of LPT3 will be fully borne by the successful bidder. In line with this, the Ministry of Works has already submitted a Statement of Needs (SON), with the permission of the House, to the Public-Private Partnership Unit (UKAS), Prime Minister's Department (JPM), for the purpose of preparing the RFP document and to subsequently bring this proposal forward for consideration and decision by the Cabinet. The current status of the LPT3 project proposal is that it is still at the stage of RFP document preparation by UKAS, JPM. For now, the government's main focus is to ensure the smooth completion of the Central Spine Road (LTU) and Kota Bharu–Kuala Krai Expressway (KBKK) projects so that they can be implemented according to the set plan. The completion of these projects is very important to complete a strategic transport network, providing direct benefits to the people, particularly in the East Coast.
Alright, I invite Dungun.
Thank you for the answer given. However, may I ask whether the 2030 Public-Private Partnership Master Plan (PIKAS 2030) involves an approach
of hybrid financing, namely 60 per cent government allocation and 40 per cent from a financing agency such as PLUS Berhad, as an example based on the Juru–Sungai Dua Traffic Dispersal Project (PTJSD) in Penang. So, what factors or constraints cause the government not to use the same approach, namely hybrid financing, for LPT3 as was implemented for PTJSD in Penang? Please explain.
Baik, Menteri.
Thank you, Honourable Member for Dungun. Hybrid financing is a new matter. However, I would like to state here that East Coast Expressway Phase 3 must be viewed together with everything the government has announced and implemented. For example, Kota Bharu–Kuala Krai (KBKK). The cost by the government is RM2.3 billion. This one is 100 per cent government. Completion at the end of 2027. The LTU, the expressway in LTU CSR – Central Spine Road Kuala Krai–Simpang Pelangai, which is RM7.7 billion, is also toll-free, completion in mid-2028. Toll-free expressways, as we know, KBKK and LTU are all thanks to "Bosku". Then the ECRL, operations began on 12 December, operations started on 12 December, RM52.43 billion. There are 12 to 16 ECRL trips a day, there are express services and there are stopping services, and I think the government looks at all the existing infrastructure in making decisions, whether hybrid or so far what we have done are preliminary studies. But in 2020, Tan Sri, until 2022, that study estimated the cost at RM9.8 billion for LPT3's 122 kilometres. But now that we have reached 2026, I think it must certainly be more than RM9.8 billion, and so far there is no proposal for hybrid financing. Thank you.
Alright, I invite Tampin.
Thank you, Tan Sri Mr Speaker. Right Honourable Deputy Minister, to what extent does the delay in finalising the RFP and the absence of a clear implementation timeline for LPT3 reflect weaknesses in the ministry's planning, when this project has long been awaited, not only by the people of the East Coast but also by users from across the country who frequently travel to the East Coast for family, work and tourism? What is the assurance that this privatisation model will not continue to be used as a reason to postpone the implementation of this strategic project if the public-private partnership model for LPT3 fails to attract investors or does not
achieve financial viability, what is the ministry's alternative plan to ensure this project is still implemented? Thank you, Tan Sri Mr Speaker.
Silakan Menteri.
This project will still be implemented even if it does not involve the private sector, if we had the money, Tan Sri. If we do not have enough money, how can we do it? So we need the private sector too. So as I mentioned earlier, KBKK RM2.3 billion, LTU RM7.7 billion, ECRL RM52.43 billion. All of these are alternative routes to the East Coast. We have implemented LPT1 at RM1.477 billion, a length of 174.5 kilometres, and we implemented LPT2 at RM4.37 billion, 183.38 kilometres. For the information, the tolls for LPT1 and LPT2 are cheap because some of them were implemented by the government. The LPT1 toll is only 12 sen per kilometre, and for LPT2, 9.84 sen per kilometre.
So, for LPT3, we should be patient, yes, 122 kilometres, we wait for the RFP. Who are the bidding companies? And the estimated cost would certainly be more than RM10 billion for 122 kilometres. Thank you.
Alright. Next, I invite Tuan Chow Yu Hui, Raub.
Mr Speaker, my question is question 3.
3. Tuan Chow Yu Hui [Raub] asks the Minister of Finance to state whether LHDNM has the right to block travel abroad due to CP500 arrears, since when this practice has been implemented, how many persons have been blocked, the legal basis, and whether a travel ban based on an estimated tax that has not been finalised is valid and reasonable.
Sila Menteri.
Thank you, Honourable Member Tan Sri. Thank you to the Honourable Member for Raub. For the information of Honourable Members, the government, through the Immigration Department of Malaysia, may implement travel restrictions abroad on any individual who is blacklisted or has debt and tax arrears under various agencies involved, such as the Inland Revenue Board of Malaysia (LHDN), the Royal Malaysian Customs Department (JKDM) and the Insolvency Department. These restrictions aim to track debtors or taxpayers who fail to settle their debts and tax arrears, even though reminder actions have been taken appropriately.
Under LHDN, travel restrictions abroad may be imposed on individuals who do not settle income tax or real property gains tax arrears, in accordance with the provisions under section 104, Income Tax Act 1967 and section 22, Real Property Gains Tax Act 1976. LHDN cooperates with the Immigration Department of Malaysia to prevent individuals or company directors who are negligent in paying tax arrears from travelling abroad. However, failure to settle CP500 instalments does not result in taxpayers being subject to travel restrictions abroad, since CP500 is not a final tax assessment. The actual tax liability is only determined after the taxpayer submits the Income Tax Return Form (Borang Nyata Cukai Pendapatan) or BNCP for the relevant year of assessment. Based on the BNCP submitted, the actual tax amount will be recalculated by deducting the CP500 instalment payments that have been made. If there is still a balance of tax payable and the taxpayer fails to settle it within the stipulated period, the balance is classified as tax arrears. To avoid overseas travel being disrupted due to failure to pay tax arrears to the government, LHDN, through various platforms, always advises taxpayers to first check their tax arrears status and travel restrictions before planning any overseas trip. Taxpayers may check their tax arrears status through the MyTax portal or through the Immigration Department of Malaysia website if there are restrictions enforced by other agencies. The government wishes to emphasise that the imposition of these travel restrictions is not intended to deny the rights of any party to move, but is implemented as a measure to enforce tax laws against individuals or company directors who have tax arrears, and to ensure that tax owed to the government can be collected for national development. Thank you.
Alright, Raub, supplementary question.
Thank you, Minister. There are indeed complaints that those who do not pay the estimated tax under CP500 are blocked from travelling abroad. My question is— what is the government's justification for restricting a citizen's freedom to travel abroad solely because of tax arrears
whose actual amount has not been finalised? And, is there a minimum threshold for arrears, or can someone who only has arrears of RM1,000 also be subject to a restriction? Will persons who are subject to a travel restriction receive a notice that actually reaches their attention? And if LHDN's estimate eventually turns out to be inaccurate, who is responsible for the losses suffered by the taxpayer? Will the Minister be prepared to review this policy so that enforcement actions are fairer? Thank you.
Ya, Menteri.
Thank you, Honourable Member. As I mentioned earlier, CP500 does not result in a restriction. A restriction only takes place after the Income Tax Return Form is finalised. And if there are arrears, after— usually, typically, after six months without tax being collected, then a restriction is imposed, and also in a situation where there is no response whatsoever to LHDN, then the restriction is imposed. Thank you.
Ya, Pendang.
Yes, thank you, Mr Speaker. Still on CP500. I would like to raise this: can the Government or the Ministry of Finance distinguish between citizens who deliberately evade paying tax and citizens who dispute the CP500 tax estimate that has not yet been finalised? Therefore, I would like to ask the Ministry of Finance or the Honourable Minister of Finance whether the Government is prepared to review the existing procedure so that the State's right to collect tax is not exercised at the expense of the principles of justice, transparency and citizens' right to a proper review? I seek clarification. That is all, thank you.
Thank you. As I mentioned earlier, CP500 does not cause any restriction. Restrictions only take place after six months, after the Borang Nyata—the Income Tax Return Form—has been finalised and there is no response between the taxpayer and the Inland Revenue Board of Malaysia (LHDN). Only after six months are restrictions implemented. Thank you.
Good. Next, I invite Dato' Abdul Talib bin Abdullah, Rompin.
Assalamualaikum warahmatullahi wabarakatuh and good day. Thank you, Mr Speaker. My question is number 4.
4. Dato' Haji Abdul Khalib bin Abdullah [Rompin] asks the Minister of Youth and Sports to state the allocation plan for grassroots sports development in rural areas so that the construction of community sports facilities is not concentrated only in major urban centres.
Silakan Menteri.
Thank you, Mr Speaker. The Ministry of Youth and Sports (KBS) has always paid attention to grassroots sports development, including in rural areas, to ensure that communities always have access to suitable sports facilities and programmes without being concentrated only in major urban centres. In 2026, KBS through the National Youth and Sports Department (Jabatan Belia dan Sukan Negara) has allocated sports development funds totalling RM7.614 million to the states, including RM648,020 to the state of Pahang. This allocation supports the implementation of programmes through the State Youth and Sports Departments and District Youth and Sports Offices to expand opportunities for public participation according to programme planning in each area. In addition, RM10 million has been allocated for sports democratisation initiatives that also target rural communities. These initiatives include, among others, the Traditional Sports League Programme, martial arts classes, swimming classes and Malaysia Active at Community, for which RM1.145 million has been provided for implementation in 113 districts with a target of 70,000 participations. Implementing programmes at district level aims to bring sports activities closer to the public and encourage the use of existing sports facilities. KBS also provides a support mechanism for organising sports activities at community level through the Community Sports Fund (Dana Sukan Komuniti) or DSK and the Sports Matching Grant (Geran Padanan Sukan) (GPS). These initiatives give associations and bodies the opportunity to organise programmes and sports activities involving local community participation, including in rural areas. For the information of the Honourable Members, sports fall under the Ninth Schedule, Concurrent List, List III, Perlembagaan Persekutuan. Therefore, the responsibility for construction, maintenance and upgrading of facilities
sports is not solely the responsibility of KBS, but also involves the role of state governments and local authorities as owners or operators of facilities. To ensure that existing sports facilities continue to be utilised by the public, maintenance aspects need to be given attention by the parties responsible for the ownership and operation of the facilities concerned. Coordination between KBS, state governments, local authorities and related agencies is important to identify maintenance needs and prevent facilities that have been developed from being neglected or failing to be used optimally. For proposals to construct new sports facilities, applications for large-scale projects involving costs exceeding RM1 million must obtain approval from the State Government Executive Council (Majlis Mesyuarat Kerajaan Negeri) or MMKN and be listed in the state wish list before the application is formally submitted to KBS for further consideration.
Meanwhile, applications for small-scale projects costing less than RM1 million, such as recreational facilities, must be submitted to KBS through the State Youth and Sports Department, the State Youth and Sports Executive Committee (Exco) or the State Sports Council, together with an estimated construction cost and related requirements. And approval of development project allocations is subject to approval by the Ministry of Economy and compliance with the stipulated conditions. In addition, every development project proposal must comply with the guidelines for preparing the Thirteenth Malaysia Plan and the development project applications for 2026–2030 set by the Ministry of Economy, particularly regarding site status and readiness. Among them, the site must have clear ownership status through registration in the name of the Federal Land Commissioner. Yes, grassroots sports development not only requires the provision of facilities, but also needs to be supported by the continuous implementation of sports programmes and activities. Cooperation between KBS, state governments, local authorities and the local community will continue to be strengthened to ensure that the sports needs of rural communities are taken into account in sports development planning, including in terms of provision, use, maintenance and— maintenance of sports facilities. Yes, thank you.
Good, I invite Rompin.
Thank you, Mr Speaker. Thank you, Honourable Deputy Minister. Sporting talent and young athletes at grassroots level actually come from rural areas. However, the condition of existing sports facilities, for example dilapidated and abandoned sports courts, will certainly hamper efforts to bring these young talents to higher levels. My question is, to what extent does the direction of the National Sports Strategic Plan integrate talent scouting programmes at grassroots level with the provision of basic facilities in rural areas such as Rompin, for example, so that they are not left behind on the radar of high-performance sports development? And what percentage of special maintenance allocation has been immediately provided to repair sports courts that are now damaged and abandoned, especially in the Rompin area? Thank you.
[Bangun]
[Bangun]
[Bangun]
Sila Menteri.
Thank you, Honourable Rompin. The Ministry of Youth and Sports, through the Ministry of Youth and Sports Strategic Plan 2026–2030, places emphasis on comprehensive and inclusive sports development, covering the strengthening of talent development from grassroots level, improved access to sports facilities, and the provision of more systematic development pathways for athletes up to high-performance level. In terms of talent development, KBS through the National Sports Council (Majlis Sukan Negara) (MSN) implements programmes such as the Talent Identification and Development Programme, the Talent Programme and the Reserve Programme to identify and develop potential athletes, and the implementation of these programmes also requires the support of appropriate basic sports facilities so that identified talent can be continuously guided and developed. And to support community-level sports development, in 2026, KBS has provided RM20 million for the Community Sports Fund and RM30 million for the Sports Matching Grant, yes. And these initiatives support the implementation of community sports activities and the organisation of tournaments and competitions
as a platform to increase participation and develop athletes' performance, including in rural areas. For the Rompin District, existing facilities such as the Rompin Weightlifting Centre of Excellence and the Rompin Rakan Muda Water Sports Complex can be used to expand talent scouting, training and the organisation of sports tournaments. And cooperation with the Pahang Sports Council, District Youth and Sports Offices, schools and sports associations is also important to identify new talent based on local sporting potential. For the information of the Honourable Member, a water recreational sports competence workshop will be held at the said sports complex tomorrow. So, perhaps the Honourable Member could drop by, yes. As for the question on special maintenance allocation, the implementation of maintenance and repair works for sports facilities is based on need, level of damage and project priority, and is subject to the current position of Government allocations. In this regard, KBS does not have a special maintenance allocation specifically determined by Parliamentary constituency, including for repair works on sports courts in Rompin. However, for the development and upgrading of sports facilities in the Rompin Parliamentary constituency, KBS has provided allocations totalling RM13.325 million for four projects, yes, namely upgrading the Rompin Rakan Muda Water Sports Complex, upgrading the Kampung Kolam football field in Rompin, upgrading the sepak takraw court in Kampung Air Batang, and upgrading the multipurpose hall at the Rompin National Sports Council Complex, yes. Thank you.
Good, I invite Bukit Bendera.
Thank you, Mr Speaker. Every time our national athletes bring home medals, we feel proud. But I often wonder how many more children with disabilities out there have talent and potential but have never been given the same opportunities, yes. So, what is even more saddening is that there are those who want to participate in sports but the facilities provided cannot be accessed by them— by them. And we have witnessed very good achievements by para athletes on the international stage, especially the success of the Malaysian contingent in winning six gold medals, eight silver and also 13 bronze at the Asian Para Games in Aichi–Nagoya recently.
gold, eight silver and also 13 bronze medals at the Asian Para Games in Aichi–Nagoya recently. So, I would like to ask the Honourable Minister, to what extent do the provisions of sports facilities in rural areas set conditions so that such infrastructure is upgraded with disability-friendly features? Because I feel talent does not recognise physical limitations, but lack of facilities can extinguish a person's opportunity to succeed. Thank you.
Sila Menteri.
Thank you, Honourable Bukit Bendera. Mr Speaker, the Ministry of Youth and Sports always pays attention to the provision of inclusive sports facilities that are friendly to persons with disabilities (OKU), to ensure that all segments of society, including para athletes, have access to safe and suitable sports facilities. And for the implementation of new construction projects and the upgrading of sports facilities under the ministry, accessibility and OKU-friendly features are taken into account at the planning and design stage of projects based on the standards in force, yes. Among the aspects given attention are the provision of barrier-free access routes, wheelchair ramps, OKU-friendly toilets, special parking spaces and supporting facilities suitable according to the scope and needs of the project. The provision of these facilities also takes into account their suitability for use by OKU in rural areas as well. For existing sports facilities that require upgrading works, OKU-friendly feature improvements are currently being considered and are being carried out. For new projects, we will ensure that all projects and sports facilities are OKU-friendly, and the ministry will continue to pay attention to the accessibility of sports facilities to support the participation of OKU in sports activities at grassroots level, thereby providing a more inclusive environment for the development of national para sporting talent. Thank you, Honourable Bukit Bendera.
Good, next I invite Puan Wong Shu Qi, Kluang.
Thank you, Mr Speaker. My question is number 5.
5. Puan Wong Shu Qi [Kluang] asks the Minister of Communications to state the enforcement status of social media age verification since 1 June 2026 as follows: (a) the number of existing accounts verified and accounts under 16 years old blocked by platform; and (b) action against platforms that have not implemented verification, and the status of the six-month transition period.
Silakan, Menteri.
Thank you, Mr Speaker. Thank you, Honourable Member. Mr Speaker, the Government, through the Malaysian Communications and Multimedia Commission (MCMC), has enforced the Child Protection Code (Child Protection Code, CPC), with permission, and also the Risk Mitigation Code (Risk Mitigation Code, RMC), with permission, on 1 June 2026 under the Online Safety Act 2025, namely Act 866. Both codes impose obligations on application service providers (ASP) and licensed content application service providers (CASP) to implement measures to protect children from harmful risks and content online, including through age verification mechanisms for social media users. Following the enforcement of the CPC, MCMC has issued Commission directions under section 30 of Act 866 to social media service providers, namely Meta, TikTok and Google, to ensure the implementation of age verification mechanisms. MCMC has also issued notices under section 32 of Act 866 to the said platforms to obtain information on the implementation of these mechanisms, including for monitoring purposes and assessing the level of monitoring. During the transition period, MCMC will continue monitoring and engagement with social media service providers to ensure that age verification mechanisms are implemented effectively. MCMC also works with relevant ministries and agencies to strengthen child protection and the digital environment. In addition, MCMC is also studying developments and approaches implemented in other countries regarding online child protection as input for improving the protection framework in Malaysia.
Any non-compliance with age verification measures under the CPC may amount to non-compliance with the obligations under section 18 of Act 866. In this regard, if a licensed service provider fails to comply with the prescribed obligations, MCMC may take appropriate regulatory action as provided under Act 866. That is my answer. Thank you.
Good. I invite Kluang.
Thank you. So, the period for this phased implementation will end at the beginning of December this year. So, I would like to know, if the ministry still does not receive any figures of accounts that have been verified and blocked— as today's answer, there are absolutely no figures— so, how can the ministry monitor the performance of implementation on those platforms? Are there other standards for monitoring, whether they implement or do not implement at all? And what action will the Government take if they do not take any action in accordance with the notices that have been issued to them? Thank you.
Ya, Menteri.
Thank you, Mr Speaker. Thank you, Honourable Member, for the supplementary question. Firstly, we are still in the transition period, or what we call tempoh peralihan. We expect that platforms will implement this obligation at the beginning of January next year. Therefore, all data on how many accounts they have verified and closed will be sent to us after the transition period. That is the first point. Secondly, on 28— before or on 28 December 2028, licensed platforms must also submit an online safety plan to MCMC, which is an obligation or duty of theirs under the Online Safety Plan Regulations, where they must also submit their plans to improve and ensure that their platforms are safe for their users. They must submit it to MCMC, sent to MCMC on or before 28 December. And if these licensed platforms still fail to comply with the obligations imposed on them, then under section 30 of Act 866,
they may, upon conviction, be fined not exceeding RM1 million and additional fines of up to RM100,000 may also be imposed for each day the offence continues after conviction. And also, we may issue a notice of non-compliance under section 37 of Act 866 and impose a financial penalty under section 39 of Act 866, the amount of which may not exceed RM10 million for non-compliance under Part III of Act 866, which includes the obligations under section 18 of Act 866. Thank you.
Good. I invite Sik.
Thank you, Mr Speaker. My question, Honourable Deputy Minister, is related to the threat of fake accounts, disinformation and also hate speech, with permission. I followed a media roundtable session on the refugee narrative issue. It was found that more than 59 per cent of accounts on social media are related to hatred and involve fake accounts, including a report by AFP, internationally, confirming a fake poster claiming that refugee groups allegedly demand Selayang and confirmed to be a fake account. And finally, these lies that are repeated cause hate speech and also prejudice among the community. So, my question, Honourable Deputy Minister, is to what extent are account verification mechanisms and risk mitigation codes used to combat these fake accounts, disinformation and to block hate speech or hateful posts that are rampant in society, causing disharmony between the community and these vulnerable groups, including to maintain the sovereignty of our nation? Thank you, Honourable Minister.
Sila, Menteri.
Thank you, Mr Speaker. Thank you, Honourable Member Sik. A very good question. But I want to stress here that, firstly, for the age limit of 16 that we are presenting or wish to implement now, firstly, we only involve age verification. So, it does not involve account identity verification. Therefore, the data that will be collected or sent to platforms relates only to their age, to verify that they are indeed aged 16 and above. It does not involve identity verification.
So, sorry to say, but it will not actually help to reduce fake accounts. That is the first point. Second, although we have a Risk Mitigation Code under the Online Safety Act, hate speech is not categorised as one of the types of online harm under the Online Safety Act. When the Online Safety Act was established, one of the concerns raised by the Honourable Members was that they feared this Act would be used as a weapon by the government to curb freedom of expression. Therefore, the types of online harm identified under the Online Safety Act do not actually include hate speech, but more on, for example, scams, such as issues and financial fraud and so on. Therefore, I think the challenge faced by our society posed by fake accounts is, in fact, very real. So, I think this question is actually very good, but unless a government or any platform is ready to implement identity verification, I think fake accounts may be a challenge that requires more in-depth discussion to consider what types of action can be taken against fake accounts. That concludes my answer. Thank you.
Alright. Next, I invite Dato' Seri Utama Haji Aminuddin bin Harun, Port Dickson.
Thank you, Tan Sri Speaker. Potholes are patched again and again, how long must this go on? Question number six is waiting.
6. Dato' Seri Utama Haji Aminuddin bin Harun [Port Dickson] asks the Minister of Works to state the total allocation spent over the last five years to repair recurring damage on federal roads, including roads that have been patched repeatedly, and what the main causes are and the ministry's mechanism to ensure that periodic maintenance work truly addresses the causes of damage, thereby avoiding waste of the people's money.
Silakan, Menteri.
Walking while exercising, The morning is beautiful; To question number six, Listen to this answer.
The Ministry of Works, through the JKR (Public Works Department), continuously improves the Federal Road maintenance programme to ensure that road maintenance and repair works are carried out according to the prescribed procedures and quality standards. For the information of the Honourable Member for Port Dickson, the total allocation spent on federal road maintenance and repair works in Negeri Sembilan over the last five years, from 2021 to 2025, amounts to RM457 million. For the whole country, the total is RM10.6 billion― 2022, RM1.1 billion; 2023, RM1.7 billion; 2024, RM2.3 billion; 2025, RM2.9 billion; 2026, RM2.6 billion. The total of RM10.6 billion over the five years includes various scopes of work such as routine maintenance, periodic pavement works and related works to ensure federal roads are always in a safe and comfortable condition for users. Various external factors, among them increased traffic load and heavy vehicles, particularly vehicles exceeding the maximum prescribed load limit, are among the causes contributing to the frequency of damage to federal roads. Besides that, the quality of paving work by contractors of utility companies that is carried out imperfectly also shortens the lifespan of the road concerned, where patching works need to be redone. Federal road structures are maintained and rehabilitated based on applicable guidelines such as the Technical Directive (Road), the Standard Specification for Roads and the Technical Note (Road), for the purpose of maintaining the quality of road surfacing and ensuring a longer lifespan for federal roads.
The mechanism used to implement road maintenance and repair works is determined by factors such as the type and level of road damage, the volume of heavy vehicles, road hierarchy, accident rate and the road's lifecycle. Among the treatment methods commonly used in road maintenance and repair are mill and pave as well as overlay treatment. This method is suitable for road locations experiencing functional damage. For road locations facing structural damage, larger treatment methods are more recommended, such as reconstruction or partial reconstruction. In this regard, several on-site tests need to be carried out first to select the right treatment method suited to the type of damage to the road concerned. Audits are also carried out on the asphalt production plants that
supply paving materials, audited for road maintenance and repair works on Federal Roads to ensure quality compliance.
Alright, I invite Port Dickson.
Thank you, Tan Sri Speaker. Thank you to the Honourable Deputy Minister for the answer just now. Apart from the continuously recurring road damage, I would like to raise the issue of street lights that frequently break down. From the JKR's feedback on the ground, the main causes are theft of underground cables and electrical components, besides weather and age factors and damage caused by accidents. This situation causes repair works to have to be carried out repeatedly and increases the maintenance cost. Mr Speaker, my supplementary question takes into account the problem of cable theft and recurring street light damage that increases road maintenance costs. Does the ministry intend to expand the use of solar LED street lights, particularly in high-risk areas? And has a long-term cost comparison study been done to ensure this technology not only reduces vandalism and electricity usage, but also saves the people's money and improves the safety of road users? Thank you.
Sila, Menteri.
Thank you to the Honourable Member for Port Dickson. In 2027, next year, for maintenance of street lights and traffic lights, we have allocated RM48 million, 2021 – RM34 million, 2022 – RM11 million, 2023 – RM47 million, 2024 – RM102 million and 2025 – RM100 million, for maintenance of street lights and traffic lights. We thank you for the proposal that street lights need to be increased with solar LED. Indeed, along the highways last year, we installed 3,000 new solar lights in relevant locations, mainly in the 11 blackspots along the highways. So, these solar LEDs do reduce costs and we will implement them in the coming years. Thank you.
Alright, I invite Kapar.
Thank you, Speaker. The latest netizen story that went viral in the mythical state of Antah Berantah, or Selangor: a ship sailing fast on the king's road. It's flooding, flooding on the road, Deputy Minister. So, does the ministry intend to introduce a stricter defect liability period (DLP) mechanism
for federal road maintenance works, so that contractors who carry out patching or resurfacing work that fails again within a certain period are required to repair it at their own cost? And what is the total amount of penalties or payment deductions that have been imposed on concession companies due to failure to meet quality standards over the last five years? Does the ministry have a life cycle cost analysis to identify federal road locations where the cost of repeated repairs has exceeded the cost of resurfacing or reconstructing the road structure? Good for new roads. So, since Kapar is a major contributor to the government's GDP, the ROI is also large, Speaker, to ensure that the roads used by these heavy vehicles are in optimal condition. Thank you, Speaker.
This question is convoluted and tangled because I don't know how to answer it. Minister, please.
I'll just answer what I want to answer, Tan Sri. [Laughter] First, road damage is caused by overloading. Second, poor drainage, flooding and so on. Third, weather and also temperature, hot–cold, hot–cold. Fourth, age. Roads have a lifespan, just like elderly people, and fifth, the quality of the paving, as mentioned by Kapar. We have carried out what is called a performance condition assessment (PCA). Previously this PCA was not done. So, we have done a pavement condition assessment and we allocated RM34 million last year to assess the condition of pavements across the entire federal road network of about 20,000 kilometres. And from that, we know the damage either in the functional category, which we can repair a little. Second, whether in the structural category, which requires more precise pavement changes, starting this year. This is what the Ministry of Works is doing, different from before. And we hope that with this PCA, (performance condition assessment), pavement work will be more accurate. Not enough money, Tan Sri, not enough money. The allocation for 2026 is RM2.6 billion for all federal road maintenance, including Peninsular Malaysia, Sabah and Sarawak, 2027 – RM2.59 billion. We need RM5 – 6 billion, we get RM2.6 billion. Therefore, the money is not enough. When the money is not enough, we must look for money, from the Ministry of Finance. Thank you.
Alright. Next, I invite Tuan Syed Saddiq bin Syed Abdul Rahman, Muar.
Thank you, Tan Sri Chairman, my question number 7.
Baik, sila.
7. Tuan Syed Saddiq bin Syed Abdul Rahman [Muar] asks the Minister of Communications to state the measures to overcome the rather limited network coverage, although the JENDELA data states that the access rate has reached 100 per cent in places such as Parit Amat, Sungai Kelat, Tanjung Tohor and Sungai Muda.
Thank you, Tan Sri Speaker. Thank you to the Honourable Member for Muar. Tan Sri Speaker, the government, through the Malaysian Communications and Multimedia Commission (MCMC), has taken note of the internet coverage issue raised by the Honourable Member for Muar in Parit Amat, Sungai Kelat, Tanjung Tohor and also Sungai Muda. For the information of the House, internet coverage in populated areas in the Muar Parliament has reached 99.98 per cent under the National Digital Network Plan (JENDELA). Although the coverage and also the access rate of internet services is high, the user experience in terms of service quality may differ according to location and local conditions. This is because the quality of internet services is also influenced by several factors. Among them, network capacity congestion, disruption of telecommunications infrastructure, as well as geography and the local environment. Therefore, the government not only focuses on expanding coverage, but also ensures that the quality and stability of internet services are always improved. Following complaints received from the Office of the Member of Parliament for Muar in November 2025, two portable based transceiver station (PBTS) communication towers have been completed in Tanjong Tohor and Sungai Kelat by CelcomDigi and also UMobile. In addition, a new communication tower by Maxis is being built in Sri Menanti and is expected to be completed in December 2026. All these towers are expected to improve coverage and also service quality in the areas around Tanjong Tohor, Sungai Muda, Sri Menanti and also Sungai Kelat. As for Parit Amat, network improvement works were carried out by the service provider in December 2025. At the same time, three new telecommunication towers are also planned under the JENDELA initiative, respectively in Kampung Sungai Muda, Kampung Sungai Balang Kecil Darat and also Kampung Sungai Balang Darat. The construction of these towers is now at the
implementation stage and is expected to be completed and begin operation in December 2026. In terms of service quality monitoring, for the period from 1 January until 1 October this year, MCMC carried out audits at 34 locations in the Muar Parliament involving six service providers.
Of that total, 18 locations were found to comply with the Mandatory Standard on Quality of Service (MSQoS), while a total of 23 non-compliances were identified at 16 locations. Following that, MCMC has issued eight compliance notices under subsection 51(2) of the Communications and Multimedia Act 1998 to the service providers concerned. Of the 23 non-compliances identified, 18 have been resolved through network improvements, while for the remaining five non-compliances, MCMC is in the process of issuing a commission directive requiring the service providers to submit an improvement action plan. Failure to comply with the directive may subject them to enforcement action in accordance with the applicable legal provisions. That concludes my answer.
Alright, I invite Muar.
Thank you, Honourable Deputy Minister. According to the Honourable Deputy Minister's answer, there are more non-compliances when audits are carried out than compliant ones. I do not want to blame the ministry or MCMC Johor, because every time I raise this issue in Parliament, the ministry and MCMC Johor do go down to the ground with me together with the central service centre team to take follow-up action. Just now the Honourable Deputy Minister also mentioned the installation of new towers and also temporary towers to reduce the burden on the people of Muar. Only, when these non-compliances occur frequently, and each time MCMC Johor has to come down to conduct audits, then the same problem recurs afterwards. If the issue repeats again and again and this is not the fault of the ministry or MCMC, can any concrete action be taken against the telcos— telcos that clearly do not comply after audits are carried out, especially when these mistakes happen repeatedly? There is a pattern and there is a trend. If it happens once we understand, but when it is repeated, there is clearly a pattern that ultimately affects the ability of the people of Muar to get good internet. Thank you.
Baik, Menteri.
Thank you, Tan Sri Speaker. Thank you to the Honourable Member. Indeed, this falls under MCMC's power to take action against service providers if they repeatedly fail to comply with the commission's directives issued by MCMC. At the same time, we acknowledge that there are areas where internet coverage is unsatisfactory. Good news for the Honourable Member for Muar too: under the current JENDELA— we have launched JENDELA 2. Under JENDELA 2, the first batch actually also includes two locations identified within the Muar Parliament constituency, where we hope that after the contracts are tendered and awarded, new communication towers will also be erected in those areas, but indeed that is within MCMC's authority to take action against service providers.
[Bangun]
Therefore, we always welcome complaints or information from the offices of Members of Parliament or the public so that we can monitor internet coverage in the areas. That is my answer, thank you.
Alright, I invite Batu Pahat.
Thank you, Tan Sri Speaker. My question to the Deputy Minister, supplementary question: is the ministry prepared to publish more detailed internet coverage data by village or district for Members of Parliament, so that Members of Parliament can identify which areas have weak coverage and help accelerate solution actions? And what is the maximum period set by MCMC for telco companies to resolve complaints of weak internet coverage, and what action will be taken if the same problem persists for years?
Ya, Menteri.
Thank you, Tan Sri Speaker. Thank you to the Honourable Member. Actually, MCMC has on several occasions prepared dossiers for areas— infrastructure dossiers and also internet coverage status for each Parliamentary constituency. In these dossiers, we also provide information following the State Assemblies within that Parliament. If the Honourable Member for Batu Pahat does not yet have the latest one, I will prepare it for the Honourable Member, and if the Honourable Member for Batu Pahat needs data on a particular village, which road, housing estate, I think MCMC can also provide that information.
Second, regarding how long a period is given to telco companies. I think it depends on the situation, whether the action can be improved immediately or requires a fairly long period. As I mentioned earlier, when we conduct audits, we find that there are non-compliances. So, there are situations where the telco can carry out improvement works immediately, but there are also situations where we will ask them to submit an improvement action plan for issues or problems that require a longer time. At the same time, we also understand that there are locations, places where there is no economic value. Therefore, JENDELA was established, where we use the USP Fund to erect telecommunication towers in certain places. After the construction of the telecommunication tower, we— MCMC will also pay for the maintenance of the site for two years and after that hand it over to the telco companies, and they will use MOCN technology so that one telecommunication tower can be used by all telco companies, to ensure that for areas with no commercial value for telco companies to enter and erect telecommunication towers, there can still be reasonable internet coverage. Thank you, Tan Sri Speaker.
Alright, I understand YB Igan is not present in the House. Therefore, I invite Dato' Dr. Alias bin Razak, Kuala Nerus.
[Question No. 8 – YB. Tuan Haji Ahmad Johnie bin Zawawi (Igan) not present]
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace. Thank you, Tan Sri Dr. Speaker. After Johor, Negeri Sembilan, now Melaka is in suspense; Kuala Nerus question number nine, Please, Minister, give the answer. Thank you.
Alright, Minister, please proceed.
9. Dato' Dr. Haji Alias bin Razak [Kuala Nerus] asks the Minister of Finance to state the indicators and success criteria of the MediAsas pilot programme that will determine its readiness for nationwide implementation in January 2027, particularly in curbing treatment costs and ensuring the affordability of protection for users.
Thank you, Honourable Member, Tan Sri Mr Speaker. Thank you, Honourable Kuala Nerus. The Government is committed to launching MediAsas in January 2027. The MediAsas plan is part of the reset strategy to improve access to affordable and sustainable long-term medical and health insurance and takaful protection, or MHIT, and at the same time serves as a platform for implementing other initiatives to address the rising cost of private healthcare. For your information, the MediAsas pilot programme, which began at the end of July 2026, is being implemented in a controlled manner in the Klang Valley to assess the readiness of ITO and private hospitals operations, as well as user acceptance and understanding of the MediAsas plan. The programme involves various user groups, including government agencies, GLCs, GLICs, SMEs and gig workers. Public feedback shows encouraging acceptance, while engagement sessions continue to be held to understand the needs and concerns of users. In line with the announcement of Budget 2027, MediAsas premium subsidies will be provided to eligible SME workers to encourage wider protection among the workforce that has limited MHIT protection or none at all. The MediAsas plan is on track to be implemented nationally by the end of January 2027. Findings from the pilot implementation and feedback from stakeholders will continue to be used to refine its implementation design, and feedback is welcome. Thank you.
Alright, I invite Kuala Nerus.
Thank you, Tan Sri Mr Speaker. Thank you, Deputy Minister. I understand that the pilot programme in the Klang Valley involved only 10 hospitals. Therefore, how many network hospitals have been finalised for implementation in January 2027 in the state of Terengganu and also in the East Coast? If the people have to go to non-network hospitals, they are charged a 20 per cent co-insurance. Will the Government
exempt this penalty for states lacking network hospitals, particularly perhaps in the East Coast later? Thank you, Tan Sri Mr Speaker.
Alright, the Minister may proceed.
Thank you, Kuala Nerus. I understand that the four largest hospital networks are highly interested and may be involved in the MediAsas scheme, although this has not yet been finalised. Bank Negara Malaysia and the Government hope that as many hospitals as possible will get involved in the MediAsas scheme. Thank you.
Tan Sri, the earlier question. I think...
Alright. [Inaudible]
[Inaudible] The 20, the one that is subject to co-payment, 20 per cent for those outside the network. What is the ministry's action?
The MediAsas concept has two parts. One is insurance, and the other is related to what this is— tiering or hospital classification.
[Bangun]
So, if hospitals comply with what has been set by MediAsas, namely what this is— namely through the Disease Related Group (DRG) to determine the fee rates at hospitals, then these hospitals are considered as what this is— "a good one," "a good kid." And it means that what this is— those who use these hospitals do not necessarily have to pay co-payment. But if hospitals do not comply, co-payment may have to be paid. But all of this is in the process of being reviewed and also in the process of the pilot programme. Thank you.
Alright. I invite Pulai.
Thank you, Tan Sri Speaker. The Select Committee on Health, we have just returned from Bangkok to look at what's the— to look at the implementation of basic insurance in Thailand, yes. 100 per cent of their citizens get this insurance protection. 70 per cent is, I think, almost the same as this MediAsas, yes. So, we also asked them how— what the Deputy Minister just mentioned, meaning those who work, right? There is also an issue there of those who do not, do not work. So, when we asked that, their answer was that it is
borne by the Government, yes, in terms of what's— insurance for those who do not work. So, my question to the Deputy Minister is, in our country's situation, how about those who do not work? Do we have an opportunity, or do they have an opportunity, to be included?
Alright. The Deputy Minister, please.
Thank you, Pulai. We have a government hospital system. We also have a private hospital system, and MediAsas, for now, is not National Health Insurance. It is a voluntary insurance scheme, voluntary. This means anyone who pays the premium gets access to hospitals, but over the last five or 10 years, private hospital rates or costs have become excessively high. So MediAsas is trying to intervene, trying to find a way so that hospital costs can be controlled and access for the largest number of people can be through government hospitals or through private hospitals— through MediAsas with controlled premium costs. So, our country's situation is rather different from Thailand's, and we are trying to find the most suitable way for our country's situation. Thank you.
Alright. Next, I invite Tuan Khoo Poay Tiong, Kota Melaka.
Thank you, Tan Sri. The people of Melaka love red, It is already bright, no need to shine a light; Women are the drivers of a bright future, My question is number 10.
[Dewan tepuk]
Alright. The Minister may proceed.
10. Tuan Khoo Poay Tiong [Kota Melaka] asks the Minister of Women, Family and Community Development to state the main findings of the evaluation of the National Strategic Plan 2020-2025, follow-up actions to address child marriage, and specific Government investments to advance the education, protection, well-being and meaningful participation of girls, in line with the theme of International Day of the Girl Child 2026, "End child marriage and invest in girls' rights!"
Thank you, Tan Sri Mr Speaker. Thank you, Honourable Melaka. Yes. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi taala wabarakatuh. Tan Sri Mr Speaker, the National Strategic Plan to Address the Root Causes of Child Marriage 2020 to 2025 was developed by the Government
through a series of engagement sessions with ministries and agencies at the Federal and state levels, the State Islamic Religious Councils, the State Islamic Religious Departments, non-governmental organisations, international organisations, as well as the participation of children, with technical support from UNICEF Malaysia. The main purpose of the programmes under this plan is to raise awareness and change perceptions and stigma associated with the issue of child marriage within society. Currently, the Ministry of Women, Family and Community Development (KPWKM) is collaborating with the United Nations Children's Fund, or UNICEF Malaysia, to carry out a study evaluating the effectiveness of implementing the national strategic plan. At the same time, KPWKM, through the Malaysian Social Institute, ISM, is also carrying out a study on child marriage in Malaysia, risk factors, protective factors and prevention strategies. The study is designed to assess the implementation of strategies by the agencies involved, identify risk factors and protective factors, and examine implementation gaps and prevention measures that need to be strengthened. Its results will in future be used to determine more focused and evidence-based follow-up actions. Both studies are expected to be completed in early 2027. Therefore, KPWKM is of the view that it is more appropriate for the Government to present final findings once the results of the study have been obtained and examined further. Once both studies have been finalised, KPWKM will use the findings to identify implementation gaps, set priorities for follow-up action together with relevant agencies, and examine resource needs more specifically. In this way, efforts to prevent child marriage can be supported by actions that meet the education, protection, well-being and participation needs of girls, in line with the theme of International Day of the Girl Child 2026, with permission, "End child marriage and invest in girls' rights!" Meanwhile, while the study is being carried out, efforts to address child marriage will continue to be implemented by KPWKM through the National Child Policy and the Action Plan 2026 to 2030. In terms of specific Government investment in the rights of girls, the Government's focus covers their access to and retention in education, appropriate information and health services, protection from
violence and exploitation, and support for families facing socio-economic difficulties. These areas are important for reducing factors that may increase the risk of child marriage. KPWKM will also take into account the views and experiences of girls in planning and improving actions that affect their lives. That is all, thank you.
Alright. I invite Kota Melaka.
Thank you, Tan Sri Speaker. Thank you to the Minister. The Minister's tudung is also red. The Minister likes red. Minister, 27 November coming up is the International Day for the Elimination of Child Marriage. So, if we look at global statistics, they show that one in five marriages involves women under the age of 18. So this is, this is something that worries us quite a bit. So, my question is, how long a timeline will be taken so that we can finalise, yes, with permission, the findings from the National Strategic Plan? And after this, will we include statistics or cases involving customary marriages, yes, customary marriages, and also marriages of children who are refugees and children who are stateless? How do we include these statistics in our study so that we can address this problem? Thank you, Tan Sri Speaker.
Alright. The Minister may proceed.
Thank you, Honourable Member. The red sign signifies women's courage, and the E-VOW is on 25 November, God willing. So, let me go to the statistics first. Statistics on marriages involving children under the age of 18, namely from civil, syariah and adat marriages. In 2019, we had 1,467 cases, in 2023, 923 cases, in 2024, 1,361 cases.
The data sources for child marriage are the National Registration Department, the Department of Islamic Development Malaysia (JAKIM), the State Islamic Religious Departments, namely JAIN, the Malaysian Syariah Judiciary Department (JKSM) and the Sarawak Customs Council. I mention this because perhaps the Honourable Member may see that, we can see that in 2024, it appears high, the increase is high. According to what? The findings in terms of the study say that, because Sarawak, not because I am from Sarawak, but because what—
the findings, with permission, show Sarawak has data, they have some that are well organised. So, we can see that increase. So, that is why, if we were asked earlier about when we will complete it. We have indeed targeted early 2027, we want to complete it so that we can continue our programme on this, on child marriage, and we are also working with UNICEF and also, we also comply with the CRC, yes, namely the Convention on the Rights of the Child. So, we are working with several other agencies or international parties to enable us to continue this study so that we can organise what we have done, because we already have our strategic plan and we want to ensure we can comply with what has been recommended by international parties and also Malaysia, ensure that we will be able to address all of this, yes. Thank you.
Alright, I invite Rantau Panjang.
Yes, thank you, Tan Sri Mr Speaker. My supplementary question— first, I would like to congratulate the ministry on its various efforts in addressing this issue. I would like to know what the plan is, the outcomes of the National Strategic Plan 2020 to 2025, which has ended, covering seven objectives, 17 strategies and 58 programmes. What is the percentage of achievement that has truly met the success targets so far, and what is the ministry's action plan together with the state governments to standardise the minimum age of marriage so that it is consistent? And, I would like to know what the ministry's efforts are? Because we are worried, it is not solely a matter of marrying under age, but the current issue is the problem of free mixing that causes teenagers and children giving birth to babies under age to also increase. So, to what extent is the ministry's effort to address this issue so that our teenagers and children can be protected? Thank you.
Sila, Menteri.
Thank you, Mr Speaker. Thank you, Honourable Member. Honourable Member, there were many questions earlier, yes. So, if we count them here, KPWKM is of the view that efforts to set the minimum age of marriage at 18 years must continue in a phased manner and through close cooperation with state governments.
To date, Selangor and Kedah have amended the provisions relating to the minimum age of marriage for Muslims to 18 years. For other states, including Melaka, any amendment is subject to the considerations and legislative processes of each state. Matters relating to Islamic family law also fall under state jurisdiction. Therefore, KPWKM is holding engagements with state religious authorities, relevant agencies and stakeholders to discuss the harmonisation of the age limit and appropriate protective measures. The views of the states need to be heard so that the proposals below can be implemented effectively. In these engagements, KPWKM will highlight information on the risks of child marriage. There is continuity of children's education, health, safety and future opportunities. The findings of the evaluation of the National Strategic Plan 2020 to 2025 and the study on risk factors and protective factors that is currently being implemented will also be used once they are finalised. While legislative harmonisation efforts continue, KPWKM together with relevant agencies will strengthen prevention through support for families, access to education, public awareness and referral to protection services. The aim is to ensure that the best interests of every child are given primary consideration, including when an application for child marriage is made. There is more I wanted to add earlier, but I may provide it in writing, about the action plan, about the policy and also the factors that cause child marriage and what we want to do, but I have already answered what we are doing, working with the states and we are trying to harmonise. If possible, we want to harmonise across the whole country, but because the matter of marriage falls under the powers of state governments, we will try. We are trying our best to ensure all states will be with the Federation and we agree on the way we want to resolve it, yes. Thank you, Honourable Member.
Alright. Next, I invite Tuan Nurul Amin bin Hamid, Padang Terap.
Assalamualaikum warahmatullahitaala wabarakatuh and salam sejahtera. Thank you, Tan Sri Mr Speaker. Padang Terap question number 11.
11. Tuan Nurul Amin bin Hamid [Padang Terap] asks the Minister of Education to state, by state, the number and percentage of schools in Kelantan, Terengganu, Pahang, Kedah, Sabah and Sarawak that have not yet achieved the KPM standard for internet speed and stability, as well as the timeline for digital education and AI readiness.
Silakan Menteri.
Thank you, Tan Sri Speaker. Thank you, Honourable Padang Terap. The Ministry of Education (KPM) is committed to bridging the digital divide by equipping all educational institutions with stable and high-capacity internet access, specifically for the states of Kelantan, Terengganu, Pahang, Kedah, Sabah and Sarawak. A total of 4,182 schools have enjoyed internet access through optical fibre, with speeds between 300 Mbps and 800 Mbps, or 78 per cent of the total of 5,362 schools in the six states mentioned. Meanwhile, in these six states, there are 1,180 schools, equivalent to 22 per cent, that still do not enjoy internet access through fibre, but have been provided with wireless broadband and also satellite internet services. The following is the breakdown of the number of schools that still do not enjoy internet access through optical fibre, namely fibre: (i) Sarawak, 759 schools or 52 per cent have not yet switched to fibre, due to geographical extent and also logistical challenges in interior areas; (ii) Sabah, 177 schools or 14 per cent; (iii) Pahang, 181 schools or 24 per cent; (iv) Kedah, 14 schools or two per cent; (v) Terengganu, four schools or one per cent; and (vi) Kelantan, 45 schools or eight per cent that have not used fibre technology. In providing digital education and also AI – artificial intelligence, KPM implements it through phased strategic planning aligned with the long-term framework, namely the Digital Education Policy and also the Malaysia Education Plan 2026 to 2035.
In the short-term phase, from 2026 to 2027, the Ministry of Education (KPM) is focusing on building the foundation of a digital learning ecosystem powered by artificial intelligence, or AI. This step covers the development of DELIMa 3.0 and the pilot implementation of the AI-Powered Classroom in 27 selected schools. These are among the efforts we mentioned here. Next, for the medium-term phase, from 2028 to 2030, under Strategic Pillar 4 of the Malaysia Education Blueprint 2026-2035, the AI-Powered Classroom will be expanded in stages based on the level of readiness of each educational institution. This implementation covers the expansion of devices, stable Internet, WiFi coverage, effective learning and also the enhancement of teachers' digital competency. At the same time, continuous training and guidance will be strengthened so that teachers are not only able to use technology, but can also integrate AI effectively in teaching and learning. For the long-term phase, from 2031 to 2035, KPM will implement comprehensively and optimally personalised learning, based on AI, DELIMa and the LAN and WAN networks. This effort is supported by performance monitoring, real-time networking and, at the same time, DELIMa 3.0 is strengthened as an intelligent learning ecosystem that supports adaptive learning, monitoring of student development and also more targeted intervention. That concludes my speech, thank you Mr Speaker.
Alright, I invite the Honourable Member for Padang Terap to ask a supplementary question.
Thank you Mr Speaker, and thank you Honourable Deputy Minister. I would like to— I want to touch on the ministry's preparedness for digital education and also AI. We were shocked by a news report about a school in Negeri Sembilan, if I am not mistaken. According to the report, there were students who altered photos of female students using AI technology into images that were humiliating, nude images. There was also a case of altering a teacher's photo using AI technology from clothed to unclothed, which is very worrying for the safety and also the psychological impact on students and teachers.
So, what is the specific cyber safety advocacy plan of the ministry to be implemented to educate students about the development of AI technology so that they are not manipulated, and their awareness of the acts or the punishments that exist within the education system and also within our country. Thank you.
Baik, Menteri.
Thank you Mr Speaker, thank you Honourable Member for Padang Terap. On this matter, the ministry is in the process and has finalised the AI literacy guidelines, which show or set out all the roles played by all parties, including the school, teachers and also students, and at the same time, parents also play a role. It cannot be denied that it is a challenge when technology develops so rapidly, but at the same time, all the parties I have named will carry out their respective roles, especially under the AI Literacy Guidelines (Panduan Literasi Kecerdasan Buatan (AI)). KPM, through the KPM Circular (Surat Pekeliling Ikhtisas) No. 2 of 2026, in which we state in these guidelines the four main domains: AI Governance, Teaching and Learning, Lifelong Learning and AI Ethics. All four of these domains are important for us to ensure that AI technology is used as well as possible to help our children in learning and is not misused. Thank you Mr Speaker.
Alright, I invite the Honourable Member for Semporna.
Thank you Mr Speaker and thank you Honourable Minister for explaining the use of internet speed and also the use of AI at the school level. Although earlier the Honourable Minister explained to some extent at the rural level, especially in Sabah and Sarawak and also in Peninsular Malaysia. And I would like to ask, the target area although it has been mentioned earlier in terms of the date of Curriculum 2027, and this is my concern especially in rural areas, especially in Sabah, Sir. Don't talk about Internet, don't talk about water, the schools that exist here, we are backward there, far behind. Don't talk about secondary schools, don't talk about schools— even UiTM in Tawau, they want to abolish it, and that is only a certificate.
Universiti Teknologi MARA, Mr Speaker, they want to close it down. Why? Just for a certificate— a diploma. It's named "university", but there is no degree. This is my concern about the education system in our country, especially not only at the primary level, but also at the tertiary level. I ask, can we allocate the amount of money, in terms of this ministry, to areas that really need it, Mr Speaker, in rural areas. Because if not in rural areas, these children go to the city, and when they go to the city, we study— accommodation, at universities today RM800 million for student accommodation at the existing universities. Where do we management? The mangement of education in this country must be very comprehensive, but the allocation the money, Internet–– we know our children— we must build them up now, we can't wait, but access to Internet, the usage today...
Yes, we understand Honourable Member, but the Honourable Member must ask a question. Minister, please.
Thank you Mr Speaker, thank you Honourable Member for Semporna for the question raised specifically for Sabah. I would like to inform the House that, when we discuss the development or the availability of Internet technology based on broadband, fibre or satellite as I mentioned earlier, specifically for Sabah, I can say here that following the government's efforts to upgrade and also shift our technology from broadband and satellite to fibre, I can state here that as of July 2024, the number of schools using broadband in Sabah was 620, fibre 494, satellite 184. And now we have succeeded in increasing the use of fibre Internet, fibre technology in Sabah, to 1,124 schools. That is an increase from approximately 494 to 1,124. And this effort will continue to ensure— we guarantee high-speed Internet facilities that are also appropriate to the technological advancement resulting from the progress of AI. Earlier there was mention of how we can ensure that the allocations disbursed can be used for dilapidated buildings and also the development of schools in Sabah. For example, for several years now the MADANI Government has given very great focus to the State of Sabah, especially in the redevelopment of dilapidated school buildings in Sabah.
For example, in 2022, the total project cost for dilapidated buildings was RM189 million covering 13 projects. Moving to 2025, RM2.3 billion for Sabah alone, 52 projects. Last year— this year 2026, RM548 million, 26 projects, and next year in the budget that we are tabling now, RM1.8 billion for 38 projects. The approval of the projects is there, and our challenge and next responsibility is related to implementation. And we will monitor from time to time, and I think from the statistics and data that I have presented, they can show the efforts of the MADANI Government that focus on the State of Sabah. Thank you.
With the Chairman's permission, actually my question that I asked earlier— may I ask, Sir? Because it was not answered. What I asked was directed to the Honourable Minister...
Under the Standing Orders, the Honourable Member is not allowed, but the Honourable Member will have the opportunity to ask during the Committee stage later.
Fasal ini soalan— saya minta di mana yang diperlukan. Kawasan saya Pulau Bum Bum ini Tan Sri Speaker, lebih daripada 15 sekolah rendah, satu sekolah menegah. You’re talking about Internet, I don’t know the list that you mention about Sabah ini, priority must be given where it is needed-lah.
Alright, the Minister may reply in writing.
Okay Sir, yes. If the Honourable Member for Semporna has specific schools, just send them to KPM, and we will try to help, but what I am able to answer, and what I answered earlier, is generally how we ensure that the allocations we deliver reach the schools that need them. Any issues relating to Internet development, dilapidated schools in the Honourable Member's area, you may submit them to KPM from time to time.
Alright. Honourable Member, the session for question time for oral answers now ends. [End of Question Time for Oral Answers]
I understand there is Standing Order 12(1), please go ahead.
Honourable Member, I rise under 18(1).
Nanti kejap.
Selepas Usul?
Minister, please sit down for a moment. I will hear 18(1) first.
18(1), namely the Motion regarding the police report lodged by Parit and also Jelutong to the Deputy Prime Minister. So, the government lodged a police report against the government. This is something awkward, something that should not happen, so we do not know who is at fault. Therefore I propose that they be referred to 36(12).
18 berapa?
18 (1)(a)...
So, what is the Honourable Member's motion?
I want to refer— because the government reports to the government and in Parliament. A police report to the government regarding rural development projects in Sabah and Sarawak.
Honourable Member, have you submitted the motion yet?
I will submit it after this.
Akan masuk?
Akan masuklah.
Alright. We will discuss after the Honourable Member has submitted the motion first.
Okay, the one I already submitted this morning concerns the action by the Attorney General (AG) in delaying, what is it, Dato' Sri Najib's detention at home.
Baik.
I will raise that, but the Speaker has not yet replied.
I have not looked at it yet. I will reply, God willing.
Thank you to the people of Malaysia.
Menteri.
Motion — Sitting Hours and Business Exempted from Standing OrdersMotion
Thank you Mr Speaker. "Under Standing Order 12(1), I respectfully propose that the Sitting today shall not be adjourned until the Committee of the Ministry of Natural Resources and Environmental Sustainability and the Ministry of Higher Education on the Supply Bill 2027 and the Development Expenditure Estimates 2027 has been debated and decided, and after that the Sitting shall be adjourned until 10 a.m. on Thursday, 12 November 2026." Thank you.
Alright. Does anyone second the motion?
Mr Speaker, I respectfully second.
Alright, thank you. Honourable Members, I now put the question to the House for decision. The question is that the Motion as moved just now be agreed to.
[Motion put for decision; and agreed to]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 CommitteeBill
The Order of the Day was read for the resumption of consideration of the "Supply Bill 2027 and Development Estimates Motion 2027 in the Committee of the Whole House." [Fifth Day] [House in Committee] [Mr Speaker presiding over the Committee]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.23 [Schedule] – Head P.23 [Development Estimates 2027] –Bill
Alright, Honourable Members. Head of Supply B.23 and Development Head P.23 under the Ministry of Natural Resources and Environmental Sustainability are open for debate. I have received a long list and I will read out these names. Starting with the Honourable Member for Bentong, followed by Kubang Kerian, Lubok Antu, Kuala Terengganu, Kudat, Gerik, Simpang Renggam, Jeli, Tebrau, Kuala Nerus, Seputeh, Arau, Kinabatangan, Mersing, Tuaran, Jerantut, Bakri, Tumpat, Hulu Langat, Sik, Balik Pulau, Kuala Langat, Kluang, Putrajaya and Penampang. Each Honourable Member is given five minutes. For that, I invite the first debater, the Honourable Member for Bentong. Please proceed.
In the name of Allah, the Most Gracious, the Most Merciful. Peace and blessings of Allah be upon you, and greetings of peace. Mr Chairman, before I begin my speech, I would like to welcome the leadership of the Sabah Students' Union. Welcome. [Applause] A message from MP Tawau. Mr Chairman, thank you for the opportunity to debate the Supply Bill 2027 at the Committee stage of the Ministry of Natural Resources and Environmental Sustainability. Bentong welcomes the allocation of RM2.51 billion for 2027.
RM1.6 billion for operating expenditure and RM910 million for development. This amount increases by about five per cent compared to this year. Bentong rises as the People's Representative for Bentong— in Bentong, forest, rivers and slopes where environmental issues are not merely policy, but a matter of people's safety every day. On 3 August, four lives were lost when a tree fell near Janda Baik. We have also not forgotten the landslide tragedy at Batang Kali. Both remind us that environmental risks must be managed before they become disasters, and not actions taken after they have taken lives. [The Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding over the Committee] Therefore, Bentong welcomes Item P.23 11800 – National Geohazard Study with an allocation of RM65 million in 2027 under a project worth RM329 million. Bentong wishes to ask the Honourable Minister. First, is the Genting Sempah-Janda Baik corridor and the old Kuala Lumpur-Bentong road included in the scope of the 2027 study? Second, will the risk map produced be shared with the local authorities and recreational site operators so that monitoring of trees and slopes can be carried out in an orderly manner. Lastly, the weather radar under Item 16800 received RM5.9 million and Bentong wishes to ask the JPS and METMalaysia, submit the radar coverage map, locations and operational status of sirens across Bentong and also want to ensure that areas such as Janda Baik, Telemong, Bukit Tinggi, Benus and surrounding areas. Madam Chairman, next, in June, the State Health Department investigated allegations that visitors suffered diarrhoea after bathing in the river at the Janda Baik recreational area. In August, we received complaints about the illegal waste development in Bentong. The people ask one thing. Is our river safe? Item P.23 07200 – Environmental Regulation received RM92.8 million. Bentong's question is, how much has been allocated for real-time water quality monitoring in Pahang and how will the new Item B.23 060100 – Enforcement Strengthening of RM1.57 million strengthen enforcement at district level.
Forests and wildlife. Item P.23 17200 was allocated RM103 million and 08600 RM54.6 million for periodic forest management. Forests are under state jurisdiction, but Federal funds can be a measure of transparency. What indicators will be used to ensure that permanent forest reserves in Pahang, including the Lentang area, are managed sustainably. Residents of Kampung Chemomoi, Bentong now also live in fear due to the presence of wild elephants. This issue is not isolated. According to PERHILITAN (Department of Wildlife and National Parks), between 2020 and 2024, a total of 4,919 human–elephant conflict incidents were recorded nationwide with estimated losses of RM39.4 million. Mainly in Johor, Kelantan, Perak and Pahang. This is an average of approximately RM7.9 million a year. Compare this with Item B.23 050600 – BKHT which is only RM1.8 million for 2027. A 20 per cent increase is welcomed, but the amount is less than a quarter of the annual average loss. For example, PERHILITAN Perak alone in 2024 received 422 complaints related to elephants and paid assistance amounting to RM150,744. So, Bentong wishes to ask the ministry, is PERHILITAN Pahang allocated additional resources under Item 030200 to strengthen the Elephant Rapid Response Team, including in Bentong. Next, does the ministry facilitate the BKHT claim process and expedite payment to farmers? What is the long-term plan under Item P.23 17200 to conserve elephant habitats and corridors so that elephants do not continue to enter villages. The stories of Dara, Amoi and Kelat have touched the hearts of Malaysians. Bentong raised it during the June sitting and the ministry's answer was that their welfare would be monitored and officially recorded, noting that 10 elephants have been exported since 1977. However, the public's concern has not subsided. The 25-year agreement was signed in 2022, but its contents are not known to the public. Bentong's question focuses on transparency and forward policy under Item 030200, can the ministry openly disclose the terms of the agreement, the transparency of permits and the expenditure allocation involving PERHILITAN. That is all from Bentong. Thank you.
Thank you Honourable Member for Bentong. I invite the Honourable Member for Kubang Kerian.
In the name of Allah, the Most Gracious, the Most Merciful. Thank you Mr Chairman. I begin my debate on Item 040300 – Biosafety Department. This is rarely raised, I would like to touch on the allocation that has already been given to manage this department in 2027, amounting to RM3.81 million. Almost the same as the previous year. The estimates book, meanwhile, lists 25 posts. Since this department regulates activities involving living modified organisms or LMOs, I ask the ministry to explain whether the number of filled posts and the existing expertise are commensurate with the workload they have to carry out, especially when today's technological developments mean buyers can buy directly from foreign countries. And what mechanisms exist to control the entry of materials from outside so that they can be regulated by the agency, so that diseases carried through the technology transfer that exists do not affect our national produce. For example, our country has faced disease problems in bananas for decades, and now in rubber and the like. I am worried that this entry without control, through post and so on, will affect control and monitoring by the biosafety authorities.
Detecting LMOs requires appropriate testing, including protein testing and PCR methods. According to the Biosafety Department, sample analysis is carried out by appointed agency laboratories, among them the Chemistry Department of Malaysia, the Ministry of Health's laboratories and FRIM. This means they have to send these materials to other departments for analysis. My question. Does the government intend to establish an LMO material analysis unit within the Biosafety Department itself? So that it can be faster and easier for them to resolve problems that arise. The major question too is― to date, how long is the period from receipt of samples until results are issued? And I would like an explanation from 2025 and 2026, how many samples were examined and the time period I have just raised. In connection with this, I also refer to the Biosafety Core Team project. The estimated project cost is RM800,000. In the estimate book
records actual expenditure of zero in 2025 and an estimate of zero for 2026 as well. An allocation of RM230,200 for 2027. What is the scope of this project and why was no allocation provided in the two consecutive years before this? Madam Chairman, apart from technical capacity, biosafety requires clear legal coordination. The Biosafety Act 2007 regulates LMOs and their products, while food derived from them is also subject to the Food Act 1983. I think the time has come for this Act to be reviewed given the very long period and the changes taking place at this time. Approvals relating to LMOs involve the National Biosafety Board, while import permits are issued by MAQIS. Each agency has its own scope of duties. When violations occur, how are cases investigated, referred for prosecution and reported? I request that, if possible, this matter be reported to this august House so that the division of duties and implementation, especially prosecution, can be carried out as well as possible. The need for this coordination has become increasingly evident as goods are purchased through online platforms and sent as small parcels. How are parcels suspected of containing LMOs or their products identified? How many parcels have been inspected and how many violations have been detected? I ask the ministry to explain the procedures for cooperation between the Biosafety Department, MAQIS, customs, the Border Control Agency and courier companies. In August 2025, in reply to my question, the ministry anticipated that the amendment to the Biosafety Act would be tabled for first reading as early as mid-2026. What is the status of that amendment now? I ask that the timeline be updated, including an explanation of the proposal for the declaration of LMOs at the national entry points and inter-agency enforcement responsibilities. I also wish to raise the issue of Item 030200 – PERHILITAN (Department of Wildlife and National Parks) in relation to Property Loss Assistance. This was also raised earlier by Bentong. My question is that the amount allocated is very small. Compared with pandas alone, which get over RM4 million, yet for the losses of these victims it is only RM1.8 million. I think the time has come for the government to increase it. There is no time. I wish to raise two matters at the end. The first, when will the National Climate Change Bill and the National Climate Change Authority Bill be tabled in Parliament? If going by
its promise, it should have been tabled this year. I would like an explanation of the status of these bills. When will they be tabled in this august House? And finally, I wish to raise the matter in relation to the Malayan Tiger under 03020...
Honourable Member, summarise. Time is up.
One minute, yes. I request it.
Tidak.
Ya?
Summarise, wind up now.
Okay. In relation to the Sultan Abdullah Royal Tiger Reserve, I would like an explanation of whether the assistance of the Federal Government towards the Sultan Abdullah Royal Tiger Reserve, which has been allocated 134,183 hectares, can be implemented as well as possible. Thank you.
Thank you, Honourable Kubang Kerian. I invite the Honourable Lubok Antu.
The Honourable Member. The Honourable Member, I rise under point of order.
Point of order.
Point of Order 36(6). Not to others, to myself, yes. I made a statement just now, namely a police report from Parit and also Jelutong. I was wrong. It was actually the MACC (SPRM) report made by Kampar. Correcting. I raise 36(6) against myself, not against others. So, no problem. [Laughter]
Today is historic, isn't it, Arau. [Laughter]
I invite the Honourable Lubok Antu.
Thank you, Madam Chairman. Greetings of peace, and greetings of harmony and unity.
Lubok Antu seeks to take part in the debate on the 2027 Budget at the committee stage for Heads B and P.23 – Ministry of Natural Resources and Environmental Sustainability. Madam Chairman, I go straight to the item under the Sarawak Forestry Department, namely 09900 – Forest Industry Development Project, Sarawak Integrated Forestry Information System, with an estimate of RM13.95 million. I welcome the government's initiative to establish this integrated forestry information system, considering that Sarawak, including the areas around Batang Ai and the interior of Lubok Antu, has vast tropical forest areas and is rich in biodiversity treasures that need to be managed sustainably. I believe the implementation of an integrated forestry information system encompassing satellite systems and geographic information systems (GIS) can strengthen the management of forest resources in Sarawak and, besides that, improve the efficiency of monitoring forest areas, especially in detecting encroachment and illegal logging activities. I also see that this project has great potential to support Sarawak's green economic development, especially the forest carbon industry and carbon credit trading, which are now increasingly receiving attention as a new source of economic growth. Therefore, I wish to ask, has this system been fully operational? Will it cover the whole of Sarawak? And how effective is this system in carrying out monitoring of resources and enforcing compliance with laws relating to forest protection in a more systematic and integrated manner? Next, Madam Chairman, I wish to raise Item 050500 – Biodiversity Protection and Patrolling Programme (BP3), which has been allocated RM59.5 million for 2027 compared with RM39.5 million in 2026. I welcome this increase in allocation and suggest that this biodiversity patrolling and protection programme also be expanded to the interior areas of Sarawak, especially around Batang Ai and Lubok Antu, which are part of the Lanjak Entimau Wildlife Sanctuary. In implementing forest conservation programmes like this, I would like to suggest that the ministry involve the participation of residents and longhouse communities who have knowledge of the intricacies of the forest. I believe young people from longhouses in the interior of Lubok Antu,
Batang Ai can be given the opportunity to be directly involved in efforts to conserve the forest and biodiversity in their areas. In this regard, I would like to propose to the ministry that it cooperate with the Sarawak State Government to establish community-level forest rangers who are given adequate allowances and training. I believe this initiative will not only strengthen forest monitoring and conservation efforts, including curbing illegal logging and encroachment of forest areas, but also open up employment opportunities and generate income for local residents. Finally, Madam Chairman, I would like to touch on Item 050600 – Assistance for Loss of Property and Crops Due to Wildlife Attacks (BKHT), which increases from RM1.5 million to RM1.8 million in 2027. I would like to ask the ministry whether the BKHT scheme can be expanded and made easier so that farmers and fishermen in rural areas and the interior of Sarawak also have access to such assistance? In Peninsular Malaysia, we often hear about elephant attacks on crops. Meanwhile in Sarawak, residents face the threat of crocodiles. Apart from threatening lives, the increase in the crocodile population also causes losses to fishermen because their nets are often damaged by these animals. In addition, farmers also often face the threat of wild monkeys in their orchards. Therefore, I hope the ministry can consider compensation mechanisms that are easier, faster and appropriate to the actual losses suffered by residents. In conclusion, Madam Chairman, I hope that every allocation provided will not only strengthen forest and biodiversity protection, but also provide economic benefits, open up employment opportunities and ensure the safety and well-being of local residents. That is all. I ask for support.
Thank you, Honourable Lubok Antu. I invite the Honourable Kuala Terengganu.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings
of peace. Thank you, Mr Chairman, for giving me the space to take part in the debate. Item 020300 – Department of Mineral and Geoscience (JMG). Mr Chairman, I begin with rare earth elements or REE. The government has implemented a moratorium on the export of raw REE materials since 1 January 2024. However, there is now conditional export relaxation for R&D purposes. Recently, DTEC Mineral and Metal Technology was reported to have obtained approval to export up to 700 metric tonnes of rare earth carbonate from Perak to the United States for the stated purpose of testing REE separation and refining technology. I do not reject external cooperation. We certainly need technology and expertise, but let us not allow our minerals to be sent abroad, the technology developed abroad, while Malaysia only gains revenue from selling raw materials. Accordingly, I wish to raise three questions. First, how many applications for REE export have been received and approved by the government, and what are the approval criteria used? Second, what concrete steps are NRES taking together with MITI and MOSTI to develop local REE separation and refining technology, including the involvement of universities, research institutions and Malaysian experts? And third, regarding the commitment to develop REE processing facilities in Malaysia. Within a period of three years, how does the government ensure that this commitment is truly implemented? What action will be taken if companies fail to fulfil their investment and technology transfer promises? Mr Chairman, I also wish to touch on the National Mineral Policy 3 or (DMN3) which was agreed by the Cabinet on 17 January 2024. Now we are at the end of 2026 and are debating the 2027 Budget. So, what is the current status of this plan? The achievements throughout 2026 and how much of the allocation has been spent? Item 040100 – Department of Environment (JAS). Every time fires and peat soil occur in this region, Malaysians also receive the impact through air pollution, health risks and economic losses. Malaysia has been a party to the ASEAN agreement on transboundary haze pollution since 2003. But after 20 years, the haze problem still recurs, and has even become worse. Singapore will chair ASEAN in 2027, intending to
strengthen the implementation of the AATHP, including accelerating the establishment of the ASEAN Coordination Centre for Transboundary Haze Pollution Control in Indonesia. This centre requires at least six member states to ratify the agreement. As of 4 November 2026, only Vietnam has reportedly completed ratification. More worryingly, the AATHP does not provide inter-state enforcement mechanisms or compensation claims. Legal action against companies that cause fires depends on the laws of the country where the company operates. I would like to ask, first, what is Malaysia's planning to support efforts to strengthen the AATHP and accelerate the ratification of the ACCTHPC? Second, if a company causing fires is in a neighbouring country, what legal action can be taken by Malaysia? How does the DOE obtain scientific evidence and cooperation with the authorities of that country? And third, when will the proposals on science diplomacy and expansion of the ASEAN haze fund be translated into action, including monitoring of hotspots and fire prevention? Mr Chairman, Malaysia also needs to be firm in enforcement within our own country, even though 95 per cent of the smoke comes from foreign countries. At the JKP meeting that I chaired, we found that only two prosecutions in court were recorded out of 3,093 enforcement actions for open burning offences. Out of thousands of actions, why are only two cases brought to court? Do most cases end only with compounds and administrative action? Is there weakness in obtaining evidence that can be accepted in court? Does the DOE face problems relating to prosecution? The ministry needs to explain the number of offenders identified, cases leading to punishment and steps to enforce prosecution. Otherwise, we can only urge neighbouring countries to act, while the effectiveness of our enforcement is also under the scrutiny of other countries. I think that is all. Thank you, Chairman.
Thank you, Honourable Kuala Terengganu. I invite the Honourable Kudat.
Thank you, Madam Chairman. I go straight to Item P.23 11800 – National Geohazard Study, which is allocated RM65 million. As we know, the Kudat Parliamentary constituency serves as a buffer zone for the disasters that hit Sabah, because Kudat Parliament is located in the north and most of it lies along the coastline. Here I wish to put forward several proposals so that NRES can take action, especially in providing data and early warnings for the disasters that occur in the Kudat Parliamentary Constituency. For example, the Pitas area is very exposed to flooding. Last year, since two major floods occurred in the Pitas area, one bridge in Kampung Pias was cut off, affecting more than 7,000 villagers because of the severed bridge. Likewise, for high-risk areas NRES should provide or build monitoring and early warning systems to give warnings to residents in the areas concerned. I also request that NRES integrate geohazard data into district development planning and land use plans. Item 11900 – National Water Resources Study. I request that NRES provide adequate allocation to the Kudat Parliamentary constituency because, in Kudat Parliament, not all, but many areas still do not receive clean water from treated water sources. So perhaps this is one opportunity for rural areas to obtain clean water from groundwater sources, but funds must be provided for studies and mapping so that we can build tube wells to supply water to areas or villages far from water pipes. Next, 12300 – Rehabilitation of Former Mining and Quarry Land. For Madam Chairman's information, the Kudat Parliamentary constituency is rich in mineral resources, especially silica sand. And some of this silica sand is currently being
exploited, especially in the Sikuati area and also on Balambangan Island. And for information, NRES and also this august House, if these silica mines are fully exploited, part of the islands, especially Balambangan Island in Kudat, will disappear. So, I request that NRES work with the ministry or departments at the Sabah State level to prepare a master plan to guarantee local residents that when these mines have been exhausted and while they are being exploited, they will not cause negative or prolonged impacts on residents and on the livelihood sources of the people in my area. And the last point, Item 07100 – PERHILITAN. I know PERHILITAN falls under the jurisdiction of the state government, but in any case, I have raised the problem, especially the crocodile threat in my area.
For everyone's information, yesterday another crocodile attack incident occurred involving a 9-year-old pupil, the late Helmy bin Jul Jahid from SK Semayan, who died as a result of this crocodile attack. I request that NRES work with the state government to find a solution to curb or guarantee the safety of residents and, in turn, ensure a balance between the ecosystem and the daily life of the community in my area. This is very important, Madam Chairman, because it involves lives, and this matter I have actually raised at several other venues, including meetings at district level, but until now I do not see any party seriously tackling the crocodile threat in my area. Thank you.
Thank you, Honourable Kudat. I invite the Honourable Gerik.
Assalamualaikum warahmatullahi wabarakatuh and salam sejahtera. Thank you, Madam Chairman. I will continue with the issue of wildlife and the role of the Department of Wildlife and National Parks (PERHILITAN). Project code B.23 030200 – PERHILITAN with an allocation of RM143.58 million, and the development project code 23 07100 of RM65.62 million. I take note of the PERHILITAN allocation. However, I would like to raise the issue of human-wildlife conflict, especially in rural areas and particularly in my own place, the Gerik Parliament. In the Gerik Parliament, we face the issue of elephants and tigers in Pengkalan Hulu, as well as elephant intrusions into plantations and settlements in the Temengor State Constituency, Gerik. The question is whether the Compensation for Property and Crop Damage Caused by Wildlife Attacks (BKHT) allocation of RM1.8 million is sufficient, because I propose that this compensation allocation should be raised and increased, since the losses suffered by residents are dozens of times the amount of compensation given. Next, I also propose that PERHILITAN, NGOs and local communities be empowered and coordinated, and the addition of Forest Rangers is also needed, because residents should not have to bear the losses alone from this wildlife conflict. My second point, Madam Chairman, is the issue of wildlife restoration, breeding and sustainable development. Also in relation to wildlife, I would like to touch on the issue of national wildlife conservation, particularly in relation to the implementation of the Wildlife Conservation Act 2010 and the effectiveness of the allocations provided by the ministry. Of the total NRES allocation for 2027 amounting to RM2.509 billion, the Forest and Biodiversity Management Programme received RM261.25 million. I would like to ask the ministry, to what extent is this allocation sufficient to ensure that the country's wildlife species are not threatened and become extinct? Firstly, the freshwater fish sector. We have high-value species such as the kelah, tengas and temoleh, which are becoming increasingly threatened in some habitats. Therefore, I propose that upstream river areas be identified and freshwater fish sanctuaries be expanded. At the same time, the government also needs to develop centres for the restoration and breeding of these fish. Not merely for release back into the
rivers, but also to enable these stocks to be commercially sold through breeding stock and controlled, lawful enclosures, so as to avoid the threat of theft and so on. Thus, we can establish a three-function model: conservation, commercial farming and eco-tourism. Secondly, likewise for animal species that can potentially be bred under controlled conditions. Among them are deer, barking deer, mouse deer, chevrotain and porcupine, among other species that are suitable based on scientific research. Why do we not increase breeding and research centres, since some of these animals can be bred for the purpose of population recovery and released back into their original habitats. For species and products permitted by law, commercial industries can be established for sale. However, in a controlled manner. Thirdly, as for large and high-risk animals such as elephants, the Malayan tiger, seladang and other endangered species, the government needs to provide comprehensive sanctuaries like elephant sanctuaries, including treatment centres, breeding, genetic research and habitat restoration. We cannot simply wait for these animals to become increasingly extinct before we take action. Fourthly, concerning food sources for animals and wildlife and wildlife habitats. Animal conservation must go hand in hand with forest conservation. We need to increase the planting of forest fruit trees, natural food source areas and animal movement corridors. Mr Chairman, I would like to propose that NRES develop a National Master Plan for Wildlife Conservation and Breeding that integrates conservation, breeding, controlled farming, release back into the wild and eco-tourism. I believe conservation should not be solely the responsibility of the government; it can become a green economic industry that involves the people, especially local residents, indigenous communities, NGOs and the private sector. Our aim is not only to ensure that animals continue to live in the forest, but also to ensure that these species can continue to breed, their habitats are preserved, and future generations can still enjoy the nation's biodiversity heritage. That is all, thank you.
Thank you, Honourable Gerik. I invite Honourable Simpang Renggam.
Thank you, Madam Chairman. Item 101000 — Honourable Madam Chairman, Malaysia has immense potential to become a hub for the development of more sustainable systems. That is to say, as an example of ASEAN countries, all ASEAN countries want to industrialise, with respect, urbanise and also digitalise. These are the aspirations of ASEAN countries. Therefore, the role of the Ministry of Environmental Sustainability in particular is very important in placing Malaysia on the world map with a more prominent role for our country. For example, the ministry's efforts to ensure that the government's role in shaping this regulatory framework is clear. Therefore, the National Climate Change Bill (RUUPIN) should not be postponed or delayed. The government must seek efforts and measures to ensure that this Climate Change Bill can be tabled in this Parliament and implemented as soon as possible. Because our country's potential to move forward in sustainability is very high. Moreover, to make the Johor-Singapore Special Economic Zone plan a success, because with the development of data centres, our country needs to develop sustainability programmes, especially since developing renewable energy is extremely urgent. So, for that purpose, the cooperation I mean between the government, industry and academia must be strengthened, because these three roles—the government with its clear regulatory framework development, the industry sector that can attract investment, and attract financing for the development of this sustainability, including academia that can integrate and connect the various disciplines we have in our country—are needed to make Malaysia a sustainable nation. So, for that, Madam Chairman, Item 03000 where only RM1.8 million is provided for assistance— for assistance for compensation for property and crop damage caused by wildlife attacks, for example. I understand that for the past four years, the owners of this property and crops have suffered losses amounting to more than RM40 million, but what we can cover is only assistance of RM1.8 million, as people say, a government contribution to show the government's concern. But for the long term, I think whether the ministry has
involved all experts, whether those related to wildlife such as elephants and so on that we commonly hear about.
So, there are many experts out there who can help our country. So, has the government attracted or engaged these groups of experts? Secondly, Item 020300 and also Item 11900. As was raised by the previous debater regarding the exploration of groundwater resources. I think the government needs to be more serious. So, what steps have been taken by the government to ensure that the development of groundwater resources keeps pace with the development of data centres that require large water supplies, and to attract more investment in water? Finally, Mr Chairman, concerning the government's plan to build the Malaysia Biodiversity Centre. I would like to ask, what is the progress of that plan and when will its construction begin? Thank you, Mr Chairman.
Thank you, Honourable Simpang Renggam. I invite Honourable Jeli.
Thank you, Madam Chairman. Jeli begins with B.030200, namely the Department of Wildlife and National Parks (PERHILITAN). Since 2009, a total of 18 Elephant Electric Fence Systems (SPEG) covering 35.6 kilometres in five states, namely Pahang, Johor, Perak, Kelantan and Terengganu, at a cost of up to RM13.4 million. I seek clarification: is this approach effective, or to what extent is its effectiveness in preventing wild elephants from entering or intruding into plantations or human residential areas? This electric fence system requires very high maintenance costs, covering electrical supply checks, separation of fenced routes and installation, without taking into account wildlife corridors that may disrupt the natural paths of elephants. There is also a possibility that it may cause injury to other animals if the system is not properly maintained.
Therefore, Jeli proposes that the ministry consider the use of an automatic alarm system, namely a trigger alarm equipped with motion or heat sensors. When elephants approach plantations or human settlements, this system will automatically activate warning sounds or light up flashing lights that can automatically drive the animals away without physical contact. Secondly, B.05600, which has been widely raised by many Honourable Members. Compensation for Property and Crop Damage Caused by Wildlife Attacks (BKHT). There is a slight increase in allocation this year, from RM1.5 million to RM1.8 million compared with last year. Jeli seeks the ministry's clarification: for 2026 up to now, how much Ringgit Malaysia has been approved, and how many recipients of this assistance are there for the Jeli Parliament alone? And Jeli would like to propose and request that this assistance, this RM1.8 million, be reviewed, because for me, for Jeli and my colleagues, as with Simpang Renggam just now, it is far too little. Moreover, when we want to give that assistance, it is only given at 50 per cent of the assessed value by the government. This means the government will assess the losses, for example if the government assesses the loss for a plantation at RM10,000, but the government only pays RM5,000. So I hope this rate can be raised a little, or I propose that— why not up to 100 per cent? Because RM1.8 million is, in my view, very little compared with the losses suffered by planters, taking into account their efforts, time, costs and energy invested by the planters. And the destruction of these plantations is truly heartbreaking. Mr Chairman, truly heartbreaking, and if we look, they are extremely disappointed when they wake up in the morning and see their plantations in ruins. So I feel that 50 per cent is very inadequate, and as a sign of a government that is caring towards the people, a government that wants to protect the people, this rate should be increased to 100 per cent, and the RM1.8 million figure should be raised further to RM10 million, I think— only then will we see that this government truly protects the livelihoods of the people in the villages, the planters and the ordinary folk at the grassroots.
And finally, Jeli greatly appreciates the government's efforts to conserve wildlife, but at the same time, do not forget that this must go hand in hand with the government's responsibility to protect the safety and well-being of the people. That is all, thank you.
Thank you, Honourable Jeli. I invite Honourable Tebrau.
Thank you, Madam Chairman. Item 40100 – Department of Environment (JAS). On 29 October 2026, the people of Tebrau were shocked by a foul, plastic-like smell. I have received many complaints from residents, including Taman Setia Indah, Taman Daya, Bandar Dato' Onn and surrounding areas. I understand that the JAS has visited several factories in the nearby industrial and commercial areas, but up to today, almost two weeks later, we have still not received any explanation or statement from JAS following that. We would like to ask, Tebrau would like to ask, what is the cause of the pollution? Is the smell toxic? Who is responsible for this air pollution? And have the wrongdoers been arrested and fined? When questions like these are not answered by JAS, this will invite negative perceptions among the people of JAS's enforcement and its competence. Pollution is not a trivial issue. I hope the Minister can provide an explanation in this august House to the people of Tebrau. Item 20400 – Land Issue. On 4 August 2026, the Johor State Government under Barisan Nasional, less than a month after winning the Johor state election (PRN), granted and completed the registration of a plot of land in Kampung Baru Cina Pandan measuring 2,030 square metres or equivalent to 21,857 square feet, with an estimated market price of RM1.75 million, to an individual who is only 38 years old. Madam Speaker, this person is not an ordinary person, Madam Speaker. He is the UMNO Youth Chief of one division in the Johor Bahru District and also holds the position of Councillor at the Iskandar Puteri City Council. When asked why a plot of land in Kampung Baru could be handed over to an outsider and a politician, a representative of the state government, namely an EXCO from the MCA party, came forward and tried to explain that
actually the mother of that individual had applied for the land in '203' and the application was approved in '204', but at that time the mother did not pay the 5A premium within the stipulated time. Therefore, in 2024, her son, with his mother's letter of consent, reapplied, and the application was approved by the Johor State Government in 2025. The question today is that the EXCO said that this is a practice: if land has been approved and, even though 5A has lapsed, the land will be reserved for the applicant or their heirs, and on that basis the government is ready to grant the land to that individual now. So I want to ask the Minister, does the law under the Kanun Tanah Negara, particularly Section 81(2), allow such a practice? Because I want to read out 81(2), with permission, in English. "As soon as by any sums have become due in respect of any land by virtue of subsection (1), the Land Administrator shall, by notice in Form 5A, require the intended proprietor to pay them to him within the time specified in that behalf in that notice and if any such sum is not so paid within the specified time, the approval of the State Authority to the alienation shall thereupon lapse." That means, if not paid, it lapses; there is nothing in 81(2) that says the land can be reserved or passed to heirs. So, has the practice referred to by the representative of the Johor BN State Government been agreed upon by the National Land Council (Majlis Tanah Negara)?
What is even more shocking, Madam Chairman, is that usually granted land is in residential status for building houses, but this granted land comes with a condition for building permanent shophouses, not residential, not agricultural, but granted for commercial use. What is more suspicious, as far as I know, there were parties who had applied for this land in 2019, and were informed by the Johor Bahru District Office (PDD) that this land had been gazetted for public use, namely for the construction of a market. Moreover, the land is now being used by KRT to serve the community. And what is even more laughable, the MCA Community Chief and JPKK themselves, whose office building was also erected on that land. It seems that it is not only the Melaka state election, MCA is being bullied by UMNO. Now even their own office is being chased out too.
Time is up.
What we often say in this House, where is the sakau? Where is the sakau? This is sakau, isn't that right, Hulu Langat? When public land is transferred to politicians, this is sakau. If you want to enter politics, do not take other people's land. If you want to enter politics, do not take the people's money. I want to quote the 33rd President of the United States, Harry Truman, "Show me a man that get rich by being a politician and I will show you a crook." Just one last issue, only 30 seconds...
Thank you, Honourable Member.
The issue of monkeys and macaques is becoming increasingly serious.
Time is up.
I hope the Minister can look into this issue to ensure the well-being so that these monkeys and macaques do not disturb the people, especially in the Tebrau area, at Sekolah Cahaya Baru, to the extent that monkeys and macaques enter classrooms and fight with teachers. Okay, with that, thank you, Mr Chairman.
Thank you, Honourable Tebrau. I invite Honourable Kuala Nerus.
Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera. Thank you, Madam Chairman. I will go straight to B.23 Item 040100, water source pollution. Madam Chairman, the allocation of the Department of Environment increased by 13.1 per cent to RM166.53 million, but the number of positions remains at 1,520. At the same time, Item 060100, the new policy on Enforcement Empowerment, is only worth RM1.57 million without any new positions. I seek clarification from the ministry: is this new policy intended to implement the amendments to Act 127 targeted for early 2027, and how many portions will be channelled to JAS? Stronger laws will be meaningless if enforcement on the ground is insufficient. The target for industry compliance with Act 127 is only 78 per cent for 2026 and remains at 78 per cent for 2027, whereas the achievement in 2025 was only 75 per cent. Does this mean the ministry is satisfied with the 22 per cent of industry that still does not comply with Act 127? Whereas, as a result of
the non-compliance with this Act can cause very serious consequences. For example, the pollution of the Sungai Gong in 2020 alone cut off the water supply to nearly 1.2 million consumer accounts. My questions are: how many river water quality monitoring stations will be added in 2027, and how many cases of water source pollution have been successfully prosecuted from 2026 until now?
Next, Madam Chair, P.23 Item 11900 – National Groundwater Resources Study. This project is valued at RM29.7 million. In 2025, only RM497,880 was spent, but in 2027 this allocation is also increased to RM10.74 million, which is three times that of this year. The question is, which state will be mapped using this additional allocation? Records from JMG – Department of Minerals and Geoscience Malaysia show that groundwater study reports have been completed for Kelantan, Pahang and Perak. However, there is no public record for the state of Terengganu. I hope Terengganu will also be given priority in the 2027 allocation.
Next, this is not merely a data issue. A UPM study found that half of the groundwater samples from the Terengganu coast have experienced salinisation. Meanwhile, a 2025 UMT study found that 9 out of 20 coastal wells were highly brackish. Each time the water supply is disrupted, residents along the coast return to relying on wells. Therefore, when will the groundwater mapping of Terengganu be carried out? How will the results of this study be integrated with the state's water supply planning together with the Terengganu Water Board (LAUT) and one? And when will the national-level groundwater management policy be finalised, so that state licensing studies and water supply planning can be carried out in an integrated manner to ensure a continuous water supply to the people?
Next, B.23 Item 00117. Madam Chair, this project, valued at RM9.95 million, did not record any expenditure in 2025. However, its allocation is also increased to RM3 million in 2027. The question is, what kind of green technology project will be implemented and who is the target? Will this allocation reach local authorities, small and medium industries and communities to adopt technologies such as sewage treatment, solid waste management and clean energy? Green technology only has meaning if it truly reduces the river and air pollution faced by the people. Therefore, what is the pollution reduction target set for this project?
Next, P.23 Item 07300 – Environmental Conservation and Restoration. Ecosystem restoration is not expenditure, but an investment in water security, biodiversity and the nation's climate resilience. However, this project, valued at RM5.5 million, will only receive RM828,000 in 2027, which is lower than the actual expenditure in 2025. What conservation programmes will receive this allocation, where will they be implemented, and what are their indicators of success?
Madam Chair, environmental allocations must be translated into tangible results. Enforcement must prevent pollution before it becomes a crisis. Water resource studies must guide long-term planning, and green technology must produce solutions that can be used by the people. Conservation must ensure that ecosystem functions remain preserved for future generations. Meanwhile, haze must be addressed at its source, not merely its effects.
Time is up.
The cost of preventing environmental damage today is far lower than the cost of restoring it tomorrow. And that cost will ultimately be borne by the people. Thank you, Madam Chair. With God's guidance and grace. Peace be upon you, and God's mercy and blessings.
Thank you, the Honourable Member for Kuala Nerus. I invite the Honourable Member for Seputeh.
Thank you, Madam Chair. I would like to refer to Item 030000 – Forest and Biodiversity Management, 020200 – Department of Survey and Mapping Malaysia (JUPEM), 020100 – Federal Director General of Lands and Mines Department (JKPTG) and 040000 – Environment and Climate Change Management. I would like to begin by asking the ministry whether any ecosystems have been identified for rehabilitation as Malaysia's contribution to the United Nations Decade on Ecosystem Restoration, or UN Decade of Ecosystem Restoration, from 2021 to 2030. If so, please inform us of the size, types of ecosystems and the level of achievement so far. This initiative is under the United Nations Environment Programme (UNEP), but is closely linked to the United Nations Convention on Biological Diversity, or UNCBD. Where the efforts of several countries, including Negara
China, have been recognised at the Conference of the Parties, or COP-UNCBD, which has just concluded in Armenia. Madam Chair, I would like to ask about the 100 Million Trees Planting Campaign, the Malaysia Greening Programme implemented from 2021 to 2025 under the Twelfth Malaysia Plan. I understand that the government development allocation was well received and also successfully achieved the target of planting the 100 millionth tree by the end of 2024.
I would like to ask whether the ministry has the same plan to continue large-scale tree planting. And also, just now the Honourable Member for Kuala Nerus spoke, and I actually understand that the ministry is also encouraging the planting of bamboo because bamboo is a type of tree, forest tree species. And in Kuala Nerus there is a research centre established by a former Member of Parliament and former Minister of Plantation and Commodities. I would like to ask what efforts have been undertaken by the ministry in this regard? And regarding the sun bear— beruang matahari. Actually, many Malaysians are unfamiliar with this animal— whether, what efforts has the ministry made to promote the introduction— regarding cherishing our sun bear? Madam Chair, I would also like to ask about the decision of JKPTG or PTP, Land and Mines Office (PTP), in terms of granting land ownership or leasing government land to private parties, because this is happening in my area where Sekolah Kebangsaan Danau Perdana in Taman Desa, the land— the school which is abandoned, but PTP or JKPTG has given the land to a private car trading company. This proposal did not involve any engagement with me as the Member of Parliament nor with the local community, and it has indeed become a highly contentious issue in Taman Desa. I understand the Ministry of Education had actually rejected the proposal to convert the school building into a pickleball court, but JKPTG or PTP still proceeded with this ownership grant. I would like to remind the relevant parties to show respect, please respect the local Member of Parliament and the local community. Before granting ownership of any land, because the same issue also happened in Kuala Kubu Bharu.
Madam Chair, my last point is— once again, I would like to raise the amendment to the Land Surveyors Act A1730, in which section 13(3) was amended to restrict non-Licensed Land Surveyor practitioners from carrying out geomatic surveys other than land title surveys. The term survey accurate technique is used in the legal definition, but its technical boundaries are not clarified, and IGRSM was not consulted before this Act amendment was tabled in Parliament. Official answers from Parliament show zero registrations during the six-month transition period and zero geomatic survey plans deposited with JUPEM until December 2025. Now, the issue of procurement eligibility has arisen due to changes in the MOF code and tender conditions, which may affect the business opportunities of geospatial practitioners who are not licensed land surveyors. This is not merely a technical land survey issue. This concerns legal certainty, fairness to other professions and the right of the people to earn a living.
Finally, my question to the Honourable Deputy Minister is this: because this issue was raised by several Members of Parliament, and in the Special Chamber speech, the Honourable Deputy Minister agreed to arrange a meeting between the Board of Land Surveyors and the Members of Parliament concerned with this amendment to the law. But after the agreement was made, two or three weeks have passed and there is still no meeting. I would like to ask, when will the meeting with the Board of Land Surveyors be held together with the Members of Parliament? That is all, thank you.
Thank you, the Honourable Member for Seputeh. I invite the Honourable Member for Arau.
Thank you, Madam Chair. Malaysian citizens, young people, people of Melaka. How are you all? I would like to speak under the heading B.030000 – Forest and Biodiversity Management. Honourable Madam Chair, based on the answer in Parliament that a total of 36,996.65 hectares of permanent forest reserves have been encroached upon or illegally logged from 2001 until 2021. So my question now is, the word is not only illegal logging, but includes clearing for agricultural purposes and theft through mining, theft of rare earths. So, during that period, Honourable Member,
5,208 have been arrested. Only 717 people were brought to court and 681 people were convicted. Honourable Member, we have the National Forestry Act 1984, which in 2022 was passed, namely a fine of up to RM5 million and imprisonment of up to 20 years. So, are there still any Malaysians who dare to clear land with such high fines? With imprisonment of up to 20 years? So, this is surprising. How do they continue to clear the land? So, my question now is, why can the government, which has all the facilities of satellites, drones and so on, not detect this? Some of these forest encroachments are carried out on a large scale. Some are done by people who hold titles such as Tan Sri, Datuk Sri and so on, other titles. They encroach upon forests. Some reach 10,000 acres, including areas of Orang Asli land are encroached upon. I received information that 10,000 acres have been encroached upon. This matter is not a small matter. It is a big matter and this encroachment is right before our eyes. One or two acres that are encroached upon may not be detected by us. This is being encroached upon on a large scale. Those who encroach on forests, including, Honourable Member, from my experience when I took part in operations in Cameron Highlands, were encroachers not the tauke. The tauke is not a local person. Outsiders, yes, but his workers encroach. Say 10 acres, he takes two acres for himself, eight acres for the tauke. So, everyone encroaches. People are racing to encroach on forests because we do not control it well. So, we only give figures. I would like to ask, up until 2026, how much area has been restored? Secondly, I would like to get information from 2021 until now, how much more forest area has been encroached upon? Because this has become like an ordinary matter. If people want to apply officially, it is difficult for us. To apply for one acre is difficult, even though they have occupied a place for decades. It is difficult to apply, but people go and encroach easily. They go to forest areas, encroach and get what they want. So, I would like to ask the ministry. Why can the latest technology available not detect this, and now, what efforts is the government making to restore all these forest areas? Finally, as a mark of respect to Madam Chair who will stop me quickly, I will go under 030200 – PERHILITAN. So, this heading is small, but
it is often talked about, namely what has happened to Dara, Amoi and Kelat at Tennoji Zoo, Osaka. So, we have received information that their welfare has not been well looked after. We request an independent report from a veterinarian regarding Dara, Amoi, and Kelat (DAK). We find that Kelat's body weight has dropped and he frequently suffers from musth, M-U-S-T-H. Musth disease which frequently occurs in Kelat. Perhaps it does not suit the weather and so on. On 19 July, Honourable Chair, the MACC arrested four individuals and also a PERHILITAN officer in connection with the DAK case, and it was alleged that transactions worth RM53 million were involved. So, I would like to ask, what has happened to those arrests and what action has the government taken to bring DAK back to Malaysia? In October 2026, calls were made by various parties, including Dr William Keith Lindsay, a world elephant expert, who proposed that Dara, Amoi, and Kelat be brought back to Malaysia. So, I ask that the ministry take note of what I have mentioned earlier, and I also suggest to the ministry that forest areas not only be restored, but expanded. Why? Forests are not only a heritage and an interest to the nation, but also the nation's tourism greatly depends on forest areas. Many people come to Malaysia not to see structures, they want to see natural forests. Thank you.
Thank you, the Honourable Member for Arau. I invite the Honourable Member for Mersing.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chair. I would like to touch on Item B— Item 050000 – Special Programmes, Item 050600 – Assistance for Loss of Property and Crops Due to Wildlife Attacks. First, I would like to raise the increasingly worrying issue of human-wildlife conflict, especially in rural areas bordering forest reserves. In the Mersing Parliament itself, wildlife conflict, particularly involving elephants, is not a new matter. Residents in FELDA settlements, villages,
traditional villages and agricultural areas bordering forest reserves constantly face the risk of crop destruction and losses that affect their sources of income. I note that Budget 2027 allocates RM1.8 million for BKHT, an increase of 20 per cent compared with RM1.5 million in 2026. While this increase is welcome, the question is whether this amount is truly sufficient to assist victims of wildlife conflict across the country. Based on implementation records for 2024, a total of 246 applicants received assistance amounting to approximately RM987,000, while in 2025, a total of 314 applicants received assistance amounting to approximately RM1.49 million. This shows an increase in the number of recipients and in assistance expenditure, which raises questions about the adequacy of the allocation for 2027. Therefore, I would like to seek the Minister's explanation on three matters. First, what is the total number of BKHT applications received, approved, rejected and still outstanding throughout 2025 and 2026, as well as the actual amount of assistance disbursed specifically for the Mersing Parliament, and how much of the applications worth RM300,000 have been approved and paid up to now? Second, is the ministry prepared to review the assistance rate and increase the BKHT allocation based on actual loss values, especially for districts recording high wildlife conflict such as Mersing? Third, what new mechanisms are planned to expedite the application, loss verification and assistance payment processes, including the implementation of a digital application system and status monitoring? I suggest that the processing and disbursement period be shortened to a target of 30 days for complete applications, without compromising the rigour of verification and the integrity of financial management. At the same time, applicants should be given the facility to check application status online without having to repeatedly attend the PERHILITAN office.
Mr Chair, apart from assistance after losses occur, I would like to emphasise that preventive measures must also be given priority. Accordingly, I would like to know how effective the Elephant Electric Fence System (SPEG) implemented by PERHILITAN is, especially in Johor.
How many areas have been protected? How much maintenance allocation has been provided, and has there been a reduction in conflict after the system was installed? I suggest that the SPEG system be expanded to high-risk areas such as Mersing, especially FELDA settlements and agricultural areas bordering forest reserves, based on technical assessment by PERHILITAN. Next, Mr Chair, Item P Item 17200 – Biodiversity and Forestry Management Division, namely the FT50 Wildlife Crossing Project and the Conservation of the Central Forest Spine (CFS) Ecological Corridor. I would like to raise the implementation status of the first Wildlife Crossing Project in Johor, on Federal Route FT50, the Kahang–Mersing route, which involves a total cost of RM66 million. Accordingly, I would like to seek the Minister's explanation on three matters. First, what is the percentage of physical and financial progress of this project as of October 2026? Is the project still on track to be completed by February 2028, or is there a risk of delay and cost increases? Second, what temporary mitigation measures have been implemented during the construction period to reduce the risk of accidents involving wildlife, especially the installation of warning signs, speed controls and early detection systems for animal presence? Third, to what extent will this project ensure the continuity of the CFS 2 Ecological Corridor, especially the forest network involving Labis Timur Forest Reserve, Mersing Forest Reserve and Lenggor Forest Reserve? Does the ministry also plan to install wildlife guide fences and camera monitoring systems to ensure these crossings are truly used by wildlife after this project is completed? Mr Chair, the importance of this project is not merely to protect wildlife, but also involves the safety of road users. Therefore, I suggest that the ministry, together with the Johor State Government and agencies, carry out mapping of wildlife conflict and accident hotspots across the entire Mersing district, including the FELDA Nitar and Jemaluang routes and road areas bordering forest reserves. Thank you.
Thank you, the Honourable Member for Mersing. I invite the Honourable Member for Tuaran.
Thank you, Madam Chairman. Tuaran is debating the Supply Motion B.23, Item 040200 – Malaysian Meteorological Department and 040100 – Department of Environment. Tuaran also touches on Development Motion P.23 regarding groundwater resources and forest fire prevention in Sabah. On 28 October, the Honourable Minister informed the House that El Niño is expected to reach a very strong level between November 2026 and January 2027. Rainfall in Sabah could also drop by as much as 40 per cent between January and March next year. Warnings have already been issued. Now, what preparations have been made, reaching the districts and villages? What warnings will be issued, who must act, and who will ensure that the action is really carried out? The Honourable Minister stated that the proposed Drought Action Plan will be brought to the National Disaster Management Council. What is its status now? While the plan is being completed, Tuaran requests an explanation of immediate action together with NADMA, the relevant ministries and the state government. Madam Chairman, in Sabah, the existing water supply problem has not yet been resolved. If rainfall decreases for months, residents will certainly suffer more. Do not let El Niño be used as an excuse for water disruptions that have already been happening for a long time. Tuaran asks the government to present preparations should the drought continue for three months. State the areas at greatest risk in Sabah, including Tuaran. Alternative water sources and how many months that supply can last. Preparations for villages, schools and clinics must be clear from now. Under Item 11900 – National Groundwater Resources Study, which locations in Sabah have already been identified as suitable. After the study, what action will be taken together with PETRA and the state government to prepare supplies. Residents need to know when those sources can be used. Another matter is food. When water is insufficient, crops and livestock can be affected. Farmers lose income. Consumers face rising prices. How will NRES work with the Ministry of Agriculture and Food Security so that farmers and livestock breeders, including those in Sabah, receive guidance and assistance before losses occur? Hot weather also threatens senior citizens, school pupils and people who work outdoors. Tuaran asks that protective measures be put in place together with the relevant ministries
be explained. Residents in remote areas who have difficulty accessing the Internet must also receive warnings and know what to do. For Item 10300, please explain the allocation for forest fire prevention training in Sabah and other support to prepare teams earlier. How will forest areas and peat soil at risk be monitored, and what joint action will be taken with neighbouring countries to deal with cross-border haze? Madam Chairman, Tuaran asks for three commitments. The date on which the drought plan will begin to be implemented, specific allocations for preparedness and climate change adaptation, including for Sabah, and the date on which each state's preparedness report will be tabled in Parliament. State the responsible agencies and the shortcomings that still need to be resolved. We cannot control the weather, but we can prepare earlier. Do not wait until rivers dry up, crops are destroyed and the people fall ill before we act. If preparations are made late, do not blame nature alone. Protecting the people remains the responsibility of the government. That is all, thank you.
Thank you, Honourable Member for Tuaran. [The House resumed sitting as the Dewan Rakyat] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presided
Honourable Members, the Sitting is suspended and will resume at 2.30 p.m. Thank you.
[The Sitting was suspended at 12.59 p.m.]
[The Sitting resumed at 2.30 p.m.]
[Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
Committee of the House.
[The House sat in Committee] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)
[Prayer recited] Bismillahirrahmanirrahim. The Honourable Member for Jerantut is invited to speak.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, greetings of peace. Mr Chairman, Mr Chairman, three issues that we— I intend to raise in the debate at the Committee stage on the Ministry of Natural Resources and Environmental Sustainability (NRES). First, Item B.23, 030200 and 050600 – Human-Wildlife Conflict. Mr Chairman, on 22 October, we raised the issue in the Special Chamber concerning the disturbance by wild elephants in Kampung Gol, Ulu Tembeling. Alhamdulillah, we received a response from the ministry level, from the Deputy Minister, regarding short-term and long-term action on this issue. However, the irony is that a few days after the presentation in the Special Chamber, the residents of Kampung Gol were once again disturbed by these wild elephants, which caused damage to their property and also their crops. So, during the discussion with the ministry at the Special Chamber, in its reply it mentioned geographical factors. But when we brought this matter to the residents of Kampung Gol, including the leadership— the Tok Empat and so on, the disturbance has become more serious over roughly the last 10 years. That means it was not from before, only these 10 years. Hence the question is, what exactly has changed in these 10 years? Why are elephants increasingly leaving their original habitat and entering settlement areas? Has there been any disruption to the habitat previously that caused their routes to change? So, that is the first question. The second question, Mr Chairman, is that when the ministry replied in the Special Chamber, there were several short-term plans, quick fixes, to be implemented. Among them was the use of satellite collars because there are two groups of elephants and we can identify their routes. However, when the disturbance happens
again, I request an assurance from the ministry that this action be expedited. Next, the capture and relocation operations also need to be expedited. And lastly, regarding heat-detection drones, whether it is appropriate to add to or increase them so that this issue can be identified? And third, Mr Chairman, I request an assurance from the ministry level that assistance for losses of property and crops be expedited. Because according to these details, the total for the whole country in 2027 is only RM1.8 million. Yet the conflict between Malaysia and wildlife has caused huge losses to the people, especially in Jerantut. If we can focus on the issue of Dara, Amoi and Kelat, this DAK that may result in millions of ringgit being returned to Malaysia from Japan. Can we further increase the financial support for residents, especially in Jerantut, in Kampung Gol, who are facing property losses because of this? Second, Item B.23 030200 and Development Motion P.23 07100 – PERHILITAN. For the information of Mr Chairman, I raised this issue on 1 December 2025 in the Special Chamber. For the information of the Chairman as well, the PERHILITAN office in Jerantut has only six staff. To handle human-wildlife conflict is not merely about sun bears, not merely about wild elephants, but also includes tigers and so on. So, when we discussed this with them on 1 December 2025, NRES informed that an application for two acres of land in Mukim Pulau Tawar had been submitted since 2022 and was still awaiting the resolution of related matters. However, until now in 2026, PERHILITAN Jerantut is still operating in rented building premises at the JKK in Kampung Bukit Rang. I am not disputing those premises, but an agency responsible for operations to capture and relocate wildlife needs a more suitable permanent premises, including facilities for storing traps, operational equipment and also temporary safe housing for wildlife. I understand that the area behind Galeri Mat Kilau was once identified as a potential site. However, the process of obtaining that land has still not been finalised. So, the question is, why can the application from 2022 still not be resolved? What are the actual obstacles and when does the ministry
expect the matter of this tenancy to be finalised so that planning for the construction of a permanent office can begin? And lastly, Mr Chairman, regarding Item 040100 – Department of Environment. Firmness in tackling cross-border haze. We are facing this conflict and I am confident that all Members of Parliament agree that the government or the country must act firmly against our neighbouring countries. I propose to the ministry that this issue be brought forward and discussed thoroughly at the committee level so that we too can give input to the committee members on what can be put in place so that it can be raised at the 2027 ASEAN Meeting that will be hosted by Singapore. As we know, Singapore is also among the countries affected by this haze issue. So, we obtain the overall views of Members of Parliament, and I feel that this is a benchmark or the best way for us to ensure that we can place Malaysia ahead, rather than political partisan issues. That is all, Mr Chairman. Thank you.
Thank you, Honourable Member for Jerantut. The Honourable Member for Bakri is invited to speak.
Thank you, Dato' Sri Chairman. I refer to Item 040100 – Department of Environment. Dato' Sri Chairman, haze is a phenomenon that has haunted and disrupted the daily lives of the entire Malaysian community for more than two months. So, here I would like to raise two matters. The first is air quality information. Dato' Seri, every day people have to make decisions on whether children may be allowed to play outside, whether it is suitable for senior citizens to walk or exercise in the park, whether workers should reduce outdoor activities, or whether a sports event can be held?
Although the API, Air Pollutant Index, is updated every hour, the PM2.5 sub-index uses a 24-hour average value. Therefore, the latest, most recent changes in pollution, such as after rain and possible changes in wind direction, may not be fully reflected in that reading. I give the example of Singapore, where the Singapore Government publishes the one-hour average PM2.5 together with outdoor activity assistance. Thus, I propose
to the Department of Environment that it provide the same readings through APIMS as a complement to the API, with health guidance coordinated together with the Ministry of Health (KKM). This information can help the people reduce exposure to any pollution risks while the government addresses the sources of the pollution. Second, I request that the Department of Environment provide an automatic air quality monitoring station in Muar District. Muar District has approximately 324,000 residents compared with 169,000 residents in Tangkak district, yet in North Johor, only Tangkak has an air quality monitoring station. It is not that I am jealous, but I hope yes— the Honourable Member for Ledang has one. I hope we can set up one in Muar District so that we can depict the actual situation of the pollution index in Muar town. We must understand that Muar town is located at the estuary of the Muar River and faces the Straits of Malacca, whereas the Tangkak Station is located further inland. When the wind carries smoke from fires in Sumatra across the Straits of Malacca, the air conditions along the coast around Muar town are very different from the readings in Tangkak at the same time. So, Muar once had a mobile station, if I am not mistaken, before 2018. During the haze episode from Riau in June 2013, the API reading in Muar once reached 746. Thus, this shows how important it is for an air quality monitoring station to be built in Muar District, because the people need to know the level of pollution in their area. Schools also need local readings to determine whether outdoor activities should be restricted or may continue. Therefore, once again I request that the Department of Environment, as quickly as possible, select a suitable site to build an air quality monitoring station so that the readings can represent the actual readings around Muar town. Dato' Sri Chairman, I would also like to refer to Item 030100 – Forestry Department Peninsular Malaysia. I would like to ask, what action is the ministry taking together with the State Forestry Department when timber has been extracted, but the required replanting has still not been carried out? The Auditor General's Report Series 3/2024 recorded that up to the end of 2023, of the 3,524 hectares that had been logged in a forest plantation project in Kelantan, 3,246 hectares had still not been replanted with rubber trees as required. The audit also estimated late penalties of RM6.87 million. At the time of checking, the penalty had still not been paid.
For cases that meet the requirements of section 24, National Forestry Act, has the cost of restoration been claimed from the licence holder? If replanting is a condition of EIA approval, has the Department of Environment investigated that non-compliance under section 34A(7), Environmental Quality Act? I propose that for projects required to carry out restoration, sufficient deposits be fixed before logging begins to ensure that— sorry Dato' Sri. The deposit can only be returned after a site inspection to confirm that the restoration works have been carried out and the target survival rate of seedlings has been achieved, if replanting was required and has been achieved. Is the ministry prepared to review whether the current law is clear enough to ensure that restoration responsibilities and cost recovery remain in force after the timber licence expires? Dato' Sri Chairman, I would also like to raise the matter of cross-border haze laws. In 2023, in a parliamentary reply to my question, the government stated that the proposal to enact a Bill on cross-border haze pollution would not be proceeded with because of the difficulty of obtaining evidence and questions of jurisdiction and the sovereignty of other countries. After receiving criticism, the ministry explained that the door remained open and consultations would continue. Nearly three years have passed, so what has been the outcome? When will this Bill be tabled? On 28 October, the Minister once again stated that...
Honourable Member, wind up.
Yes, just a little more Dato' Chairman. The Minister once again said that the challenge of obtaining evidence overseas and stated that there is not yet strong evidence confirming that plantation companies linked to Malaysia caused the fires. So, what information has been requested from Indonesia and the Malaysian-linked companies? Who checks the concession locations, ownership structures and fire prevention records? A statement that evidence is insufficient must be followed by efforts to complete the evidence. Dato' Sri Chairman, SUHAKAM has stressed that haze will affect the rights of
Honourable Member, five seconds more, I will close.
Okay. [Laughter] So...
Terima kasih.
The government cannot allow weaknesses in legal instruments to become a shield for the interests of big companies while the people continue to bear the cost of pollution. So, I request that the Minister set a timeline for the drafting of this Bill and explain to the leading agencies and the allocation and period of investigations. That is all, thank you.
Thank you, Honourable Member for Bakri. The Honourable Member for Tumpat is invited to speak.
Assalamualaikum warahmatullahi taala wabarakatuh.
Waalaikumussalam.
Thank you, Honourable Member, Mr Chairman. I refer to Item 030000, namely Forest Management and Biodiversity. Following the declaration on 16 July 2025, the Kelantan State Government agreed to gazette part of the islands in the Tumpat Delta as a Permanent Forest Reserve. My question is, what comprehensive plan is there for the protection of the mangrove ecosystem, coastal areas and biodiversity of all the small islands in Tumpat, including areas that do not yet have PFR status? Item 020200 – JUPEM. Tumpat requests a postponement of the enforcement of the amendment to the Surveyors Act because many issues that have not yet been resolved relating to stakeholders, especially concerning licensing and geomatics work. What is the status of action on the petition by 14 professional organisations, and the number of workers involved and the firms involved in geomatics work previously? Does this restriction truly increase safety and service quality? How many cases have been reported previously? Referring to Item 02811, best practice. We look at other countries that use geomatics expertise. There are two approaches.
First, an approach without specific licensing, as in countries such as the United Kingdom, Australia, Canada and New Zealand, and also a regulatory approach, regulatory route, as in China. The question is, if Malaysia chooses the regulatory approach, each geospatial discipline should appropriately be assessed based on its own expertise and importance, while retaining land ownership surveying as a specialised field for Licensed Land Surveyors.
In this regard, we need to refer to what other places have practised, and we see that it requires something new, namely Item 02811 — recognition and career opportunities for geomatics and geospatial professionals not limited only to licensed surveyors. In this situation, we must establish mechanisms for recognition, competency, registration and professional accreditation that are suitable under the law for it to be enforced. Graduates who have already been approved by the Malaysian Qualifications Agency (MQA) must have a future in the nation's geomatics, especially as we face climate change. How far has this matter been mastered? And I also want to ask the government, when will that Act be made, what is the relationship between Act 458 and Act A170, and how far are state government powers in relation to it subject to Act 458 as amended through Act A1730, particularly regarding the definition and scope of geomatic surveying? What activities can still be carried out by non-JTB practitioners in the states? Fifthly, regarding enforcement between the states and the Federation. How does the division of powers under the Ninth Schedule of the Federal Constitution apply to geospatial activities that are not related to land ownership, and what are the implications of Article 75 as well as the possible use of the mechanisms under Article 76A and other relevant provisions? Item 020300 and Item 2000 – Management and Development of Minerals (REE) and 07301 – Climate Change Policy. What is the ministry's timeline for finalising the legal framework for REE management and the amendments to the Mineral Utilisation Act 1994? We can study how Australia, where the federal state plays an important role for state governments in mineral management, and Canada, which protects provincial powers through section 92A in its Constitution, do this.
Tumpat refers to the Critical Minerals MoU signed between Malaysia and the United States on 26 October 2025 during the ASEAN Summit. Through the MoU, Malaysia commits not to restrict bans or quotas on REE exports to the US, and to cooperate with American companies in the use of the REE sector. REE is a strategic material that is closely linked to the defence supply chain and green technology. Tumpat's question is: what is the current status of the implementation of the MoU? Is NRES ready— is it preparing or updating a legal framework, including the Australian model that I have just mentioned, to ensure that the use of REE is sustainable, protects the environment and also maximises added value domestically, rather than merely becoming a supplier of raw materials? How does the government balance international strategic interests with the sovereignty of the nation's mineral resources and the concerns of local communities? Under Item 0701 – Climate Change Policy Development. What are the latest developments of the National Carbon Market Policy and what is its implementation timeline? In Australia, they have the ACCU system, and Canada has a carbon credit system. What about us? How will we in Malaysia determine the granting of carbon credits arising from gazetted forests, mangrove forests and state-owned peat land? The best studies must be done, and we see this as something that must be viewed holistically so that the states can bear the cost of restoration, and it must be guaranteed by law so that both parties obtain win-win outcomes. Federal and state climate change legislation: what is the timeline for tabling the National Climate Change Bill and also the National Climate Change Authority Bill? Will the National Climate Fund provide specific allocations for climate change adaptation such as flood mitigation, coastal erosion and mangrove ecosystem protection? Laws must have clear mechanisms, particularly relating to forests, land and natural resources. What are the KPIs and outcomes that must be achieved by the end of 2026, and also the status of the phased implementation of carbon pricing that has been studied through the NREE system, carbon tax and subsequently an emissions trading scheme? Lastly, Item 12300 – namely the Rehabilitation of Former Mining and Quarry Land. What is the government's mechanism to ensure that land purchased by people
ramai khususnya yang dibina di tanah lombong, bekas lombong di bawah projek- projek perumahan yang ingin dibeli dan adakah kerajaan akan membuat undang- undang mandatori agar kawasan berisiko bencana ini dilarang daripada pembinaan projek selagi ia nya tidak dinyahkan daripada pemetaan risiko bencana? Sekian, terima kasih.
Thank you, Honourable Tumpat. I invite Honourable Sik to speak.
Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera. Thank you, Honourable Dato' Sri Dr. Mr Chairman. I will go straight to Item 030000 – Forest Management and Biodiversity. Mr Chairman, I would like to draw the attention of the Honourable Deputy Minister of NRES who is present in the House today. The strategic importance of the Ulu Muda Forest Reserve in Sik District, which is among the most important water catchment areas in our country. The Ulu Muda forest complex covers around 160,000 hectares, with approximately 51,000 hectares classified as Water Catchment Forest in 2018, and this forest has supplied water to more than 4.2 million people in Kedah, Penang and Perlis, including supplying more than 96 per cent of the water needs of the people of Kedah, 80 per cent for Penang and 70 per cent for Perlis. The people of Penang here, they use water from Sik District. Where is Honourable Jelutong? Is he not here? So, Honourable Deputy Minister, the importance of water in Ulu Muda is for domestic use and also for irrigating paddy fields in the MADA rice granary area, and of course it has a major impact on the nation's food security. And Ulu Muda is also a national biodiversity treasure, including habitats for elephants, tapirs, seladang, tigers and various species of flora and fauna, and the tualang honey bee tree, which is the best in this Peninsula. And the FRIM study that assessed the economic and biodiversity value and ecosystem services of the area at around RM25.72 million a year. Honourable Deputy Minister, my question on this issue is: based on the official answer by NRES in the Dewan Rakyat on 19 November 2025, Kedah received only RM52.98 million in Ecological Fiscal Transfer (EFT) funds for
the period 2019 to 2025, equivalent to around RM7.57 million a year, which is very small. Whereas the EFT allocation for the whole country for 2027 was announced at RM270 million. So, my question, Honourable Deputy Minister, is: what is the commitment of the Federal Government to introduce a specific fund for the conservation of strategic water catchment forests, particularly Ulu Muda, with larger, consistent financing that is commensurate with its benefits to the three states mentioned earlier? Second, what is the direct commitment of NRES through the Forestry Department and PERHILITAN to protect the large elephant habitat there, as well as the flora and fauna, including flowers that may not exist elsewhere, including how this commitment will be implemented for the conservation of this hidden forest area, and also to prevent encroachment, and to empower the economy of commodities based on those natural resources? So, I want to stress that the state government that protects the forest, particularly the Kedah State Government, which safeguards the interests of this forest for the sake of millions of people, should not bear the cost of conservation alone when the benefits are enjoyed by the whole nation. Honourable Dato' Mr Chairman, I will now go to the second item, namely 11800 – National Geohazard Study. In the National Geohazard Study allocation, it increased from RM18.36 million in the amended estimate for 2026 to RM65 million for 2027, which is a fairly significant increase of around 254 per cent. However, the target for compliance on critical slopes for 2027 is only 100 areas, compared with 263 areas that were monitored in 2025. So, my question is: why has the allocation increased more than threefold, but the monitoring target is much lower? What is the guarantee that this allocation will truly strengthen the mapping of risk areas, early warning systems and protection for residents, especially rural communities, including in Sik District, which is also exposed to floods and landslides that recently occurred in one village there? So, I request the Minister to explain the targets of success, coverage of risk areas and effective mechanisms for delivering warnings to the people. Mr Chairman, that is all for— I seek an explanation from the Honourable Minister. Thank you.
Thank you, Honourable Sik. I invite Honourable Balik Pulau to speak.
Thank you, Chairman. I want to raise two main issues, namely the development of the rare earth element (REE) industry and the effectiveness of government efforts in protecting the nation's forests and biodiversity. First, on the REE matter, I want to touch on Item 020300 – Mineral and Geoscience Department Malaysia, which received an allocation of RM88.052 million. In today's world context, the wave of artificial intelligence technology, the AI bubble, has pushed up the value of REE as a major commodity in modern geopolitics. Its use is very critical in producing high-performance processing chips such as those from Nvidia, magnets, batteries, electronic components and green technology. Moreover, this supply chain is highly dependent on international strategic chokepoints, such as the dominance of advanced semiconductor chip manufacturing by companies such as TSMC and the monopoly of advanced lithography machines by the company ASML in Europe. Malaysia actually has a strategic position to join the regional semiconductor and critical minerals supply chains. Therefore, we cannot merely become a supplier of cheap raw materials, but must instead develop downstream processing capabilities, namely downstream processing, so that technology, expertise and high economic value are also enjoyed by the nation and do not continue to be controlled by— and tied to foreign companies. In this regard, the government has introduced an export moratorium on REE raw materials to encourage industry development. Recent developments also show the government providing conditional export flexibility through the Conditional Export Guidelines for REE Raw Materials for research and development purposes, subject to the company's commitment to cooperate in developing processing facilities in Malaysia within three years after export approval. Therefore, I want to seek an explanation: to what extent will this flexibility be monitored so that it truly becomes a catalyst for technology selection and domestic investment, and not open the door to exporting raw resources without proper economic spillover to the nation. Furthermore, it is very appropriate for us to jointly reflect on the development of the REE industry with the question of environmental sustainability.
We do not want to chase short-term economic returns to the point of jeopardising water sources, forest areas, land and the well-being of local communities due to mining activities with weak monitoring. Heeding the proverb, "What is chased is not caught, and what is carried spills away." We must be careful that the eagerness to chase economic progress does not leave environmental destruction behind. We want to avoid yet another major loss that will eventually have to be borne by future generations. Accordingly, I also seek the Honourable Minister's explanation regarding the development allocations under Items 11200, 11700 and 12500. What is the specific amount that will be utilised for mapping, resource verification and REE education development? Does the ministry have specific targets for identifying the total REE resources of the nation? What is the coordination mechanism between the Federal Government and state governments to ensure that the SOPs for non-radioactive REE mining and the Environmental Impact Assessment (EIA) are fully complied with? Does the ministry intend to publish periodic reports detailing the volume of production, investment developments and environmental compliance, so that the public can assess this transparently? Next, Mr Chairman, I want to bring up Item 030200, namely the PERHILITAN Department. I am raising the issue of three elephants belonging to Taiping Zoo, namely Dara, Amoi and Kelat, also known as DAK, who were transferred to Tennoji Zoo, Osaka, in March 2026. Since the transfer, there have been many concerns about the physical condition, psychology and environment of all three elephants. Among them is head swaying behaviour, which is repetitive movement that may be associated with stereotypic behaviour. Although such behaviour does not necessarily prove stress or neglect, it requires expert assessment to identify the actual cause. On 16 June 2026, an assessment report by International Elephant Conservation Expert Dr. William Keith Lindsay was submitted to NRES. The report was based on a review of 155 hours of video footage of DAK's behaviour at Tennoji Zoo. The question is: what is the ministry's follow-up action on the findings of the report? In addition, in September 2026, the Taiping Municipal Council (MPT) confirmed that Kelat had experienced a weight loss of around 100 kilograms, from 2,800 kilograms to 2,700 kilograms. Although MPT stated that Kelat's condition remains
under control, the weight loss raises concerns and questions about the monitoring of diet, health, veterinary care and the suitability of the surrounding management. So, I also want to remind the House that on 29 April 2026, the Minister of NRES himself urged that all three elephants be brought back to Malaysia and asked Taiping Zoo to begin negotiations with Tennoji Zoo. Therefore, I wish to put forward three questions. First, what is NRES's follow-up action on the expert assessment report involving the 155 hours of footage? Is the ministry prepared to send independent veterinary experts and elephant behaviour experts to Tennoji Zoo to conduct a comprehensive physical and psychological examination? Second, what is the periodic monitoring mechanism that is required of Tennoji Zoo, particularly regarding weight, diet, veterinary health, movement space, social interaction and the habitat conditions of DAK? Will the monitoring report also be submitted to the Government of Malaysia for review? Lastly, what are the latest developments in negotiations for the return of DAK to Malaysia, as recommended by the Minister of NRES last April? If the independent assessment finds that their welfare has been affected, will the ministry ensure that this repatriation process is carried out? What is the timeline and what concrete steps have been set? Thank you. Thank you, Mr Chairman.
Thank you, Honourable Balik Pulau. Please, Honourable Kuala Langat.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. I will go straight to several matters that I wish to raise. Firstly, B.23 Item 040000 – Environmental Management and Climate Change. Activities/Programmes, Item 40100 – Department of Environment (JAS). The issue of open burning involving large dumps of plastic waste and also e-waste still occurs from time to time, even though there is a prohibition on such imports, and this also includes the state of Selangor and the district of Kuala Langat. I understand that this requires an integrated action, whether at the level of the Land and District Office, the local authorities, the Department of Environment and the Royal Malaysia Police (PDRM), to enforce these illegal activities. Nevertheless, I think the involvement of the enforcement officers of the Department of Environment itself is still being questioned, because every time such open burning incidents occur, there is still the absence of enforcement officers from the Department of Environment, and among the matters raised is the shortage of officers. I hope this issue will be taken seriously because it will eventually become an endless problem. Next, P.23 Item 07100 – PERHILITAN. The allocation increases from RM53.1 million to RM65.6 million next year. In particular, I want to mention the issue of monkeys in village and rural areas. PERHILITAN's data recorded 66,825 complaints of human-wildlife conflict over a period of four years, with estimated losses of RM46.5 million. The average is around RM11.6 million a year. The BKST allocation for 2027 is RM1.8 million. I think this is far too low, although we know that this allocation is not compensation, but a one-off payment, and I see that the monkey problem in Kuala Langat is truly never-ending. I— I think in the Selangor State Assembly, many districts also question the problem of monkeys, and some are also suspected of causing house fires because they use the wiring to move around and they jump about there, and eventually the connection, the joint between the wiring and the house is disrupted, which ultimately causes fire. However, I want to ask the government as well: what is actually the more effective programme for reducing the monkey population? Although many traps may be provided, even though there are none, usually the shortage becomes a problem too, but I think there needs to be a better action, especially from PERHILITAN in an integrated manner.
And then, I also want to raise the matter of the crocodile population, which, from what I observe, is increasing in Kuala Langat because there are many complaints about crocodiles that have been identified in
And then, I would also like to raise the matter of the crocodile population, which, from what I can see, is growing in Kuala Langat, because there are many complaints regarding crocodiles that have been identified in
...drainage, the drainage system including the drains and also along the riverbanks, from fishermen, from... and also from the fishing associations themselves. And I think recently it even came up to, to the jetty platform, yes, and I was informed that although a report had been made, but to install signage for danger zones, crocodiles and so on, it seemed there was no action, and the reason given was financial factors. I hope this can be taken into account before fishing communities become victims, especially if it is at Pulau Carey, where there are quite a large number of Orang Asli fishermen. Next, I would like to touch on Item 07200 – Environmental Regulation, which increased from RM77.5 million to RM92.8 million. Regarding the burning of— with this e-waste, yes. I recall this e-waste became a major issue before we— the ban in April 2026, and seizures are still occurring by enforcement officers. And I think the amount that is compounded or fined is also too small, yes. If it is mentioned that 16,000 tonnes of e-waste were seized and only 1.1 million was imposed as fines or compounds. So, I see that e-waste disposed of by burning, or illegal processing, must continue to be eradicated even though this is a very big challenge. And I also want to ask what preparedness there is at the government level regarding e-waste sourced from solar panels, which we have mentioned, say, to produce just one megawatt requires 300— 3,000 to 3,500 solar panels. And if in Selangor, yes, in Lembah Bernam and also in Bestari Jaya, to produce more than 600 watts means nearly more than two million solar panels. And after 25 years, 30 years, they no longer function. Are we ready, how do we dispose of e-waste from these, these solar panels? Which I think is something very important. That is only part; not yet counting Kuala Langat or across our whole country. How many of these solar panels need to be disposed of, and the method should be one that provides benefits and does not victimise the people of our country. That is all. Thank you, Mr Chairman.
Thank you, the Honourable Member for Kuala Langat. The House invites the Honourable Member for Kluang.
Thank you, Dato' Sri Chairman. Item 17200 – Biodiversity and Forestry Management Division under Development Head 23. The allocation for this item increases to RM103.35 million for next year, which is 16 times the revised estimate of RM6.28 million for this year. However, at the same time, the target for forest management and biodiversity programme three has been reduced. For example, the target area of degraded forest to be restored and rehabilitated in Peninsular Malaysia for next year is only 65 hectares. The target for 2026, which is this year, is 120 hectares, with a revised estimate of RM6.28 million. Meanwhile, the actual achievement last year, which is 2025, was 435 hectares, with actual expenditure of only RM2.9 million last year. So next year, the allocation increases 16 times, over 100 million more, but the target is reduced to 65 hectares. At the same time last year, the target, which is the KPI, was achieved at 435 hectares, with an allocation of only RM2.9 million. So, I request an explanation from the ministry: what programmes were actually implemented? And besides that, the target for the number of documentation completions of species and ecology of terrestrial flora and fauna has also been reduced from 80 to 50. Therefore, I ask the ministry to explain why the allocation is increased 16 times while the target is reduced. Still within the context of biodiversity conservation. I would like to touch on the ecological fiscal transfer (EFT) coordinated by this ministry. The EFT allocation is raised to RM270 million for next year. Appendix E, the Estimates book, shows that EFT paid to states increased by 32 per cent from RM190 million in 2024 to RM250 million in 2025. However, Johor received RM22.44 million in 2025, a decrease of RM2.2 million compared with RM24.65 million in 2024. Johor and Sarawak are the only states that received a little less even though the total EFT increased. I ask the ministry to explain the EFT distribution formula. Why has the allocation for Johor decreased? And whether EFT payments are conditional on compliance with the amendments to the National Forestry Act 2022, particularly for states that degazetted Permanent Forest Reserves. Moreover, the EFT allocation of
RM270 million is not stated as a separate item in the Estimates Book 2027. I have already flipped through it. It is not in this estimates book. It only appears in Appendix E as the actual payment to states. Previously it was, it was stated although not under the— the estimates under NRES, but it was under MOF, but this time, the estimates book does not state any item anywhere regarding EFT. So, I ask the ministry to state under which item this EFT allocation is placed. Most importantly, how much EFT will each state receive for 2027? Item 08600 – Sustainable Forest Management (JPSM) under Development Head 23. While the Item 17200 is increasing 16 times, the allocation for item 08600 for the Forestry Department of Peninsular Malaysia (JPSM) is reduced from the revised estimate of RM87.1 million this year to RM54.6 million next year. What is the reason for this reduction? I request the ministry to provide clarification. And lastly, Item 030200 – PERHILITAN under Supply 23 and Item 07100 under Development Head 23. The operating allocation for PERHILITAN increases from RM121.7 million to RM143.6 million. Meanwhile its development allocation increases from RM53.2 million to RM65.6 million. However, the KPI for strengthening the conservation of the Malayan Tiger and endangered wildlife species is only the number of integrated operations carried out, which is 12 operations per year. This means that as long as operations are carried out, regardless of how many Malayan Tigers and endangered wildlife remain, the KPI is still achieved. With this increase in allocation, I propose that the KPI be changed to an outcome-based KPI, with permission, outcome base. For example, the tiger population count, the number of illegal poaching cases and the number of snares destroyed. Only then do we have a more appropriate barometer for— for assessing our outcomes and the allocation we spend. Otherwise, as long as operations are conducted, the KPI will still be achieved. For me, that is not rational enough. That is all, thank you.
Thank you, the Honourable Member for Kluang. The floor is given to the Honourable Member for Putrajaya.
Thank you, Mr Chairman. Item 030000 – Forest and Biodiversity Management, 030200 – Department of Wildlife and National Parks (PERHILITAN), 07100 – PERHILITAN. Mr Chairman, on 23 October 2025, in this House I raised the issue of disturbances by monkeys, wild boars and also civets in Putrajaya. I also proposed that the government set up a wildlife management plan for urban areas, particularly in Putrajaya. I also proposed that a special task force be established involving the Putrajaya Corporation, PERHILITAN and related agencies to discuss short-term, medium-term and long-term plans to resolve the conflict between wildlife and humans in Putrajaya.
So my question is, has any action been taken in the context of the proposals I mentioned earlier? Why? Because I see the situation remains the same, Mr Chairman. As a Member of Parliament, I am also tired of bringing the same issue to this House repeatedly. We have only five minutes, but because this issue has dragged on for a long time. If I wish to record it here, monkey disturbances in Precincts 6, 11, 15 and 17. This I receive frequently. Wild boar disturbances in Precincts 7, 9, 11, 15, 17 and 18, civets– 11 and 14, not to mention other wildlife including snakes. It has been mentioned here many times, and the situation remains the same. My purpose in raising this here repeatedly is to make things easier for the government. If this matter is curbed earlier before the situation worsens, it is much easier because Putrajaya is not large and these animals do not originate from that area, but from the forests around it. But if the action is only okay, we will take action, we will do it, it will never be resolved. Monkeys have climbed up to more than a dozen floors, entering residents' homes. It seems simple, but if left alone, this is a dense area, and the situation will become much worse and more serious. Secondly, Mr Chairman, I would like to touch on what many of my colleagues have already mentioned, regarding the three elephants, Dara, Amoi and Kelat, D-A-K. Many have spoken at length on this issue. The Honourable Minister also said he would discuss with the zoo to see whether they can be brought back. The Perak State Executive Councillors have also
met with the Prime Minister. The Taiping Municipal Council said it could carry out an audit at the zoo, and we can see the expert report explaining various conditions. And, I want to explain, what is the main issue here? The main issue regarding these three elephants is the issue of trust. Let's be very transparent. What exactly is in the agreement? Because I was informed that this agreement has been submitted to the committee in Parliament and is being scrutinised. Why does it take such a long time to scrutinise? Be transparent, show what is in the agreement and show what steps have been taken. If not, this matter will continue. It is not productive for the government to handle this issue piecemeal. Only when people make noise do they start to speak. Only when people make noise do they start to speak. Be transparent, show what has been done and show what next steps the government will take. So, I feel this has dragged on for a long time, it has reached the level of the Minister, it has reached the level of the Prime Minister, it has been brought into this House, so what is the solution. That is my question. Next, Mr Chairman, I would like to touch on Item 08100 – Herbal Product Development Centre and Item 08510 – Resource, Management and Produce Research Development. Mr Chairman, Malaysia's land, Malaysia's forests, Malaysia's biodiversity are blessed with various types of trees and various types of herbal plants. If we look at herbal plants or trees, they fall into two groups. One already has scientific research showing its beneficial effects on human health and wellbeing or consumers. The second, which has been traditionally used for generations, but there is still no in-depth scientific research. What we see now is how other countries use our forest produce to produce health supplement products and market them throughout the world, and overall, these health supplement products are worth tens of billions of dollars worldwide. So, what action do we take in this context? We have a lot of high-quality forest produce and herbal produce, but we merely talk about it as we did in the past. Oh, tongkat ali, boil it in water and so on, whereas the world takes these products through a more scientifically in-depth process, producing various products,
including products for use by sports athletes, and gaining much benefit from products originating from our own land. Therefore, I request the ministry to look at how to develop downstream industries related to Malaysian forest herbal products. Thank you, Mr Chairman.
Thank you, the Honourable Member for Putrajaya. The floor is given to the Honourable Member for Penampang.
Mr Chairman, Sabah records 62.53 per cent forest cover, followed by Sarawak with 61.52 per cent, compared with the national forest cover of 54.4 per cent. This makes Sabah and Sarawak the main stakeholders in any legislation, policy and initiative related to forestry, climate change, environmental sustainability and the national carbon market. The extensive— the extensive forest cover in Sabah will certainly help Malaysia's commitment to the Paris Agreement and the United Nations Sustainable Development Goals. The National Carbon Market Policy was launched in April this year. I would like to ask the ministry, what initiatives have been implemented since this policy was launched. I also want to ask the current status of the National Climate Change Bill. Were the views and stance of the Sabah State Government, as the main stakeholder, taken into account in the process of drafting this law? Although land and forestry are State List matters under the Federal Constitution, because Malaysia has international commitments, it is only right for the ministry to look at better cooperation, including increasing Ecological Fiscal Transfer funds to Sabah as an incentive to subsidise the national forest cover. Mr Chairman, under Item 020300 – Department of Minerals and Geoscience, RM88.051 million has been allocated. I record my appreciation to the Department of Minerals and Geoscience (JMG) for the initiative to build tube wells and filtration systems in several districts in Sabah, especially those that do not yet have treated water supply. I welcome the JMG's continued cooperation with the Sabah Rural Development Ministry in making the Alternative Rural Water Supply Programme in Sabah a success.
in Sabah a success. I hope more funds can be channelled to build tube wells and filtration systems in Sabah, including in the areas I represent, namely Penampang and Kadamaian, which have villages on the hills that do not yet have treated water supply and always or frequently face water supply problems every time there is a dry season. Mr Chairman, under Item 11800 – National Geohazard Study (JMG), RM65 million has been allocated. I would like to ask, what studies will be carried out under this allocation for Sabah and whether the study findings will be shared with the Sabah State Government so that disaster risk management measures can be taken. Under Item 12300 – Rehabilitation of Former Mines and Quarries (JMG), RM571,600 has been allocated. I would like to ask the ministry, what proactive efforts the ministry will make to cooperate with the Sabah State Government to rehabilitate the former copper mine at Mamut, Ranau so that it can be developed into a productive site for Sabah's economy. Mr Chairman, under Item 10804 – Heart of Borneo Project for the State of Sabah, RM411,000 has been allocated. I welcome the ministry's continued commitment to sustaining this project. However, I would like to propose that the ministry also take a new initiative, by simultaneously allocating annual funds to support or cooperate with state authorities to sustain forest areas and geoparks that have received international recognition, such as the Kinabalu UNESCO Global Geopark, and may also include the Crocker Range, Penampang, Keningau. Mr Chairman, the Sabah Government will launch the Blue Economy Industrial Park in Kudat, themed as an eco-friendly industrial park, community integration and green technology, bordering the Tun Mustapha Marine Park. Meanwhile, the POIC Lahad Datu Industrial Park also borders a large mangrove forest area, which forms part of its ecosystem. I would like to ask, what is the role and contribution of the ministry in efforts to make industrial development succeed while at the same time requiring the conservation of parks and forests around it. Mr Chairman, I hope that if not all can be answered during the winding-up, given that many have debated, at the very least written answers can be provided. Thank you.
Thank you, the Honourable Member for Penampang. As the last debater, the floor is given to the Honourable Member for Kinabatangan.
Thank you, Mr Chairman. Thank you for the opportunity given to me to take part in the debate on the Supply Bill 2027, Committee Stage, for the Ministry of Natural Resources and Environmental Sustainability (NRES). Mr Chairman, first, Item 050600 – Assistance for Losses of Property and Crops Due to Wildlife Attacks. The question is, what form of assistance will be disbursed? Will it be in the form of cash, building materials, or direct payment based on loss assessment? Therefore, I ask the ministry to elaborate on the eligibility criteria, the maximum assistance limit, the assessment method, and the approving authority after a complete application is received. Next, will this scheme cover the State of Sabah? If its implementation is limited to the jurisdiction of PERHILITAN in the Peninsula, what then is the mechanism for cooperation with the Sabah Wildlife Department so that residents there also receive equivalent protection? Furthermore, I also request an explanation on whether livestock losses are covered and how claims from communities in interior areas can be facilitated? Mr Chairman, second, Item 10803 – Sabah Forest Resources Sustainable Development Programme. I request a detailed breakdown by location, component and beneficiaries. Specifically, how much will be allocated to support the restoration of wildlife corridors and riparian areas in Kinabatangan? In addition, it must be understood that it is these severed forest corridors that are the main cause of the increasing clashes between humans and wildlife. Therefore, forest restoration efforts must be accompanied by inclusive consultation with the state government, plantation operators and village communities. Next, what are the targets for the restoration area, corridor continuity and projected reduction in conflict incidents for 2027. Mr Chairman, third, Item 07200 – Environmental Regulation. What form of strengthened river pollution monitoring has been specifically planned for Sabah? How many inspections, compounds, prosecutions and
rehabilitation orders relating to plantation activities in Kinabatangan for the years 2022 to 2026? At the same time, I request clarification of the dividing line of action under the jurisdiction of the Sabah Department of Environment (JAS) and the action of state agencies, including the Sabah Environmental Protection Department. This is very important to be coordinated so that complaints regarding pollution, erosion and riverbank encroachment do not continue to drag on due to overlapping responsibilities and also bureaucracy. Mr Chairman, fourth, Item 11800 – National Geohazard Study. Of the RM65 million allocated, how much will be channelled for geological hazard mapping in Sabah, particularly in Kuamut and also in Kinabatangan? What concrete plans does the Department of Minerals and Geoscience (JMG) have to identify earth faults, high-risk slopes and areas requiring further assessment? From the perspective of risk governance, the primary data produced by JMG must be integrated across agencies together with local authorities and implementing contractors. This step is extremely critical considering that the alignment of Phase 1B of the Sabah Pan Borneo Highway is currently being rapidly built across the Kinabatangan Parliamentary constituency. The integration of this geohazard data is important to ensure that slope-cutting and earth-shifting activities do not trigger the risk of slope failure or large-scale landslides, and thus guarantee the local safety of residents in interior villages. Mr Chairman, fifth, Item 07301 – Development of Policies Relating to Climate Change and Reporting Obligations under the UNFCCC. How can the allocation of RM400,000 support the coordination of climate policy between the Federal level and the State of Sabah? I request an assurance that the drafting of legislation and carbon trading mechanisms will take into account state jurisdiction, land rights and the interests of local communities. Therefore, what consultation channels and benefit-sharing methods are proposed by the ministry? Mr Chairman, sixth and last, Item 08100 – Herbal Product Development Centre. We see this allocation rising significantly from RM450,000 to RM3.377 million. Therefore, in line with the increase in this fund, what development components are financed and what measurable outcomes are promised, including commercialised products, entrepreneurs guided and
opportunities for participation for operators in Sabah? More importantly, if traditional knowledge is used, what form of protection and fair benefit-sharing is there for the indigenous communities of Sabah? Mr Chairman, in concluding my speech, Kinabatangan begs to support. That concludes my speech. Thank you.
Thank you, the Honourable Kinabatangan. Before I call the Minister to respond, as a reminder, the Honourable Minister may respond to the issues raised by Honourable Members who are present in this House so that time is observed. Meanwhile, issues raised by Honourable Members who are not in the House may be given written replies. For the Minister who has committed to providing written replies to the issues raised, these must be given to the Honourable Members concerned within five days. Thereupon, I invite the Minister of Natural Resources and Environmental Sustainability to respond. 30 minutes.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of God. Greetings of peace, greetings of Malaysia MADANI.
Waalaikumussalam.
Thank you to Mr Chairman. Thank you for the guidance that has been given. First, I would like to extend my sincere thanks for the concern of all 24 Honourable Members who have debated and submitted proposals and valuable input to this ministry in passing the Budget 2027 at the committee stage this afternoon. Given that the issues raised by the Honourable Members are quite numerous and the time given by Mr Chairman is limited, I will not respond to issues relating to policy that have already been answered during the policy winding-up session by the Honourable Minister. I will also give priority to the questions raised by Honourable Members
who are still in the House this afternoon. Not all of these are here, but I will― those who are still in the House this afternoon. Mr Chairman, with permission, I will proceed with the winding-up of the debate on the Supply Bill 2027 at the Committee Stage for Supply Purposes and Development Purpose 23 under the Ministry of Natural Resources and Environmental Sustainability (NRES), by providing explanations on the matters raised by Honourable Members during the debate. There are several issues that have become trending among Honourable Members. The first, I would like to touch on the issue of human-wildlife conflict, which has drawn the attention of many Honourable Members. I first greatly appreciate the concern of Honourable Members on this issue, particularly relating to the safety of residents, damage to property and crop losses due to wildlife conflict. These are the matters raised by the Honourable Members, among them the Honourable Bentong, Kubang Kerian, Lubok Antu, Gerik― Gerik has― Simpang Renggam, Jeli, the Honourable Mersing, Jerantut, Kuala Langat, Kinabatangan. So, it means there are many. Although some were not present, we take into account the presence of the Honourable Member. Therefore, I would like to explain a little regarding the initiative, particularly the Assistance for Losses of Property and Crops, or BKHT. The Government through PERHILITAN Peninsular Malaysia, the Sabah Wildlife Department and Sarawak Forestry Corporation has implemented this Assistance for Losses of Property and Crops Due to Wildlife Attacks since 2024 to lighten the burden of people who suffer losses. For the information of the Honourable Member, BKHT is a one-off financial assistance and not in the form of compensation. The Honourable Gerik earlier said this was compensation. It is not compensation actually, but it is in fact a one-off financial assistance that is not in the form of compensation or indemnity. It is given to the target group who suffer damage to property and destruction of crops due to wildlife attacks, subject to the applications and conditions set. The target group eligible to apply for this assistance consists of Malaysian citizens from among village residents, local communities,
smallholders, farmers, fishermen, inland fishermen and livestock breeders who do not receive assistance under the relevant schemes at Federal or state level. How is the mechanism for assessment and determination of the assistance rate? In terms of determining the assistance rate, loss assessment is carried out by 11 designated technical agencies based on the BKHT SOP currently in force. It has its categories and there are levels of loss suffered by the applicant. For the category of food crops, industrial crops and high-value commodities including fertigation crops, the assessment takes into account factors such as the number and age of affected trees, and the area of crops that have been damaged.
The total assistance approved is subject to existing allocations and the consideration of the BKHT assessment committee. For complete BKHT applications that meet the requirements, the period for resolving the application is between 44 to 72 days. However, the ministry will review the SOP so that the approval process can be expedited in the future. For the information of the Honourable Member, this SOP process is actually reviewed or checked every year. So, when there are complaints and proposals that it be expedited, this can be taken into account by the committee for the coming year 2027. This matter will be reviewed again in January 2027 so that we can expedite the process. That is, if it is up to 72 days, perhaps it can be expedited further so that we can give an assurance to those who bear the losses.
Honourable Minister, just a moment, please.
Okey.
Since it has come to the matter of compensation or issues involving human-animal conflict, I mentioned in my earlier speech that in my area a crocodile attack has just occurred, resulting in the death of a nine-year-old child yesterday.
So, does this also fall under the category that can be assisted through— what is it called, the assistance under NRES or any other existing government agency? Thank you.
Yes, thank you, Kudat. I have not reached that point yet, but I will take into account the views or developments mentioned by the Honourable Kudat just now, especially regarding the deceased, we extend our condolences, but we will also do a review with the Sabah side, yes. In Sabah, to obtain more up-to-date and more detailed developments. Dato' Pengerusi, I would like to continue on the performance of the implementation and disbursement of BKHT. For the period 2024 to 2026, the Government has allocated a total of RM12.7 million for the implementation of BKHT. As of September 2026, a total of 740 applicants have received benefits with an overall amount of RM3.6 million, with the breakdown as follows. 2024, 246 recipients, assistance amount RM987,000.00. 2025, 314 recipients, assistance amount RM1.497 million. As of September 2026, 180 recipients, RM1.2 million. Specifically for the state of Pahang, the reported loss amount was RM1.3 million, while in the state of Perak it was RM696,000.00. Of that amount, the Government has disbursed BKHT assistance of RM197,000.00 to applicants in Pahang and RM100,000.00 in Perak. This means, the reported loss in Perak, specifically for the Honourable Gerik just now, applied for RM696,000.00, but what was given was RM100,000.00 in Perak. Meanwhile, for the state of Kelantan, a total of RM416,000.00 in BKHT assistance has been disbursed to eligible applicants for the Jeli District this year, specifically applications received are still under consideration for approval. If there is assistance, if there is information, I will channel it to the Honourable Member later. The disbursement of BKHT assistance is carried out through electronic funds transfer (EFT) to applicants who have been verified and approved by the committee. Let me explain a little. When we speak of assistance for losses of property and livestock, this assistance is to lighten the burden. Actually, what is more important, and no less important, is for us to look at the root cause of the conflict. And that is what many of the matters raised by the Honourable Members are about.
To address these losses, if we do not address them, if we do not overcome the root cause, then for as long as that remains, this assistance will not be sufficient. And that is what has been raised by many Honourable Members. That is, if we look, let us ensure that this assistance has indeed increased every year, Dato' Pengerusi. It increases every year. From before, RM1 million, RM1.2 million, until the coming one for Budget 2027 is RM1.8 million. So, there is indeed an increase, but is it sufficient? It will never be sufficient if we cannot address this conflict more thoroughly or with a more— better solution. That is why - nevertheless, I take note that we must have close cooperation between the Federal Government and state governments. Because among the causes of this conflict is also the change in land use at the state level which has resulted in encroachment and conflicts that do not end or are not resolved. This matter requires close cooperation and close monitoring so that land use is carried out according to the established standards, whether by the Federal Government or state governments. Honourable Member, at the same time, we also have assistance for victims of wildlife attacks. For this, we provide incentives to ease the burden of victims who suffer injuries or the heirs of victims who lose their lives due to wildlife attacks. For the information of the Honourable Members, through the decision of the Cabinet on 26 March 2025, the management of the Trust Fund for Assistance to Victims of Wild Animal Attacks under the Department of Social Welfare (JKM), Ministry of Women, Family and Community Development (KPWKM), has been transferred to NRES and rebranded as Assistance for Victims of Wildlife Attacks, managed by the PERHILITAN Department. For 2026, the Government has provided an allocation of RM300,000.00 for the implementation of BMH. As of September 2026, a total of 145 recipients have benefited with an assistance amount of RM145,800.00, subject to applications and the eligibility conditions set. Indeed, there are conditions that have been set by the technical agencies for us to give all kinds of assistance. It is simple because we want to avoid problems of misuse or people taking advantage.
So, the conditions are quite important. For example, it must be one's own land, it must be one's own plantation, not someone else's plantation, not someone else's land. These are matters commonly done. So, these conditions are important to be implemented by the technical agencies to carry out monitoring and then, carry out a process to see that the assistance is delivered to the victims. Dato' Pengerusi, the Honourable Gerik proposed that the Government strengthen efforts to address human-wildlife conflict through the development of a comprehensive wildlife master plan. For the information of the Honourable Member, the Gerik District forms part of the Belum Temenggor Forest landscape, which has strategic importance in the conservation of the nation's biodiversity. Especially as a habitat for various wildlife species such as elephants, tigers, tapirs and also sun bears. Accordingly, the Government, through the implementation of the Central Forest Spine Ecological Network Master Plan 2022, continues to strengthen efforts for the conservation and preservation of habitats and the continuity of wildlife movement corridors. For the Gerik and Hulu Perak areas, there are three main ecological networks that have been identified, namely first, Temenggor Forest Reserve, Aman Jaya Forest Reserve, Belum Forest Reserve. Second, Padang Chong Forest Reserve, Sungai Kuak Forest Reserve, Lapang Neniring Forest Reserve. And third, Belukar Semang Forest Reserve, Kenderong Forest Reserve and Bintang Hijau Forest Reserve. The implementation of this initiative focuses on the protection of permanent forest reserves, the restoration of degraded forest areas, and the planting of forest tree species, particularly fruit trees that serve as natural food sources for wildlife. This effort aims to improve habitat quality, maintain the continuity of ecological corridors and reduce the risk of conflict between humans and wildlife. In this regard, coordination is also carried out between the Forestry Department of Peninsular Malaysia (JPSM), the Perak State Forestry Department, PERHILITAN Department and related agencies. The Government will continue to strengthen the implementation of the master plan through strategic cooperation between the Federal Government and state governments to ensure habitat sustainability and conserve biodiversity, in addition to reducing conflict between humans and wildlife.
So, these are among the matters that we need to do in greater depth, take long-term, medium-term and short-term measures.
For example, if we mention conflict with monkeys, macaques and so on. Short-term, perhaps provide cages and so on, but that is not adequate. So, medium-term is for there to be efforts to protect habitats. Alongside this, we also need to look at whether this habitat is suitable for the circumstances, the environment, food, feeding places and so on, and finally, these studies are carried out to provide us with the long-term. The main avenue for us to resolve the problem of conflict between humans and wild animals. Gerik.
the Honourable Minister. Okay. I would like to rewind a little on the BKHT matter earlier. Regarding BKHT, if we go by it, there really are problems when it is said that land is not owned land, and then the person has already received assistance from elsewhere and then does not get it. I have received all kinds of complaints, but I want to know too. If the land is leased, with an agreement and so on, can it not be taken into account? Or must it still be a title (geran), in the name of the title, or how is it? Because we have to be flexible too, since nowadays there are all kinds of arrangements, right? There are land leases and so on. Secondly, regarding the wildlife matter just now. Government programmes really need to have local representatives. Because local people can be said not to know. For example, big programmes like SPINE and so on just now. When there is no representative from the local residents themselves, whoever should be in it is chosen. Then the information does not reach them, and for residents, the action is slow or not effective, just like that. Because the issue of elephants and tigers is very frequent. They have already entered village areas. This matter is very dangerous, in my view very dangerous. So, I ask for the Minister's view.
Minister, additional [Unclear] a little, Minister, may I?
You did not debate earlier, right?
Sekali isu...
I am not allowing it. I want to give those who debated the chance to answer the questions.
Because it is related to the monkeys earlier.
No, no. I am not allowing it. Sorry, because I want to be fair to those who debated. Sorry, Hulu Terengganu, yes. Okay. Gerik. The earlier question, the additional interjection. Yes, that's right. I think that in terms of BKHT, if, for example, we give that space, we have a problem regarding what the main criterion used is. In this context, it must be in the form of a document or an owner's agreement. Therefore, it is based on documents, not merely exchanges and so on, but must be based on clear evidence. Regarding local representatives, I agree. In my view, any programme implemented by the ministry must involve representatives. However, we must determine whether these representatives are in the form of district representatives or community representatives. There must be a plan made so that many people are involved. In any case, in terms of, for example, if there is conflict between wildlife and humans, there actually already is— a wildlife protection community has already been established in Kluang as a pilot project in Kluang. And I have also answered before, we can implement this in other places, including in Gerik or in other places, or in Putrajaya. So that these people have a say in getting involved and seeing the new developments themselves.
Thank you, the Honourable Deputy Minister. First of all, I thank you for the lengthy answer regarding this human-wildlife conflict. And I have listened to this explanation. If we look at the issue, in forest reserve areas it is more complex. With elephants, with tigers, all sorts, but in the context of a city like Putrajaya, it is, how to put it, the habitat is indeed overgrown scrubland in the surrounding areas that have been gazetted for development, that have already been developed. So, these animals will just circle around that same place. Very— a rather compact, rather small place.
So, that is why I have always emphasised that the government needs to seize the opportunity to resolve this issue earlier in places like this. If the monkey lives there, wherever it goes, it just circles there. If the wild boar lives there, it is indeed that area, bush here, bush here, but the issue is getting bigger by the day, increasing more and more. So, I am worried. If we just let it be, catching them with cages and so on will never solve it. If the government can, as I mentioned, sit down, form a task force, see how to resolve it, God willing, this matter can be resolved before the situation becomes worse. That is one point, Honourable Minister. The second point from earlier, I heard other colleagues who live in or in areas with forest reserves and so on. To what extent is the government using the buffer zone approach to provide food for these wild animals before they can enter residential areas? In other words, the food supply buffer zone must definitely— must be large. And I know that in Sabah it has been implemented and it is effective. So, in the Peninsula, what is the approach to providing this rather large buffer zone so that eventually they do not get to reach residents' areas? Thank you.
Honourable Deputy Minister, there is a related question. May I? I want to ask for your view and perhaps an explanation.
Yes, please, Sik.
A few, year 20— okay?
I have many more issues on this, but briefly, briefly.
Yes, okay. I want to know the progress of the Elephant Sanctuary Project announced by NRES in 2024 earlier, in the Forest Reserve in Pedu and also the Forest Reserve in Gerik. So, what is the status of this sanctuary project and is there also a need seen to build an elephant conservation centre in the north? At present, it is only in Pahang. Cases of elephant relocation are very evident, including in my district of Sik. Almost every year there must be relocation. And when officers come from Kuala Gandah in Pahang, the cost is very high and so on. So, should this also be seriously looked at by the ministry? Thank you.
Thank you, Sik. Thank you, Putrajaya earlier. I will try to answer in writing later too, but generally, because if we look at this conflict, there is indeed a difference between urban and rural conflict. And I have some experience when I saw this conflict in the city, namely in Penang. I saw a project implemented by an NGO, carrying out a scientific study for six months in the areas of Batu Feringghi and Penang. And they conducted that study not merely based on reason. That is, based on months of observation. Their feeding habitat, what food they eat, where they live. That is, for us to address this matter more thoroughly, we actually need to understand the habitat. Any habitat at all. Whether elephants, tigers, monkeys, long-tailed macaques, especially humans. So, that means we need to know. And in the Penang project, what they implemented was that there turned out to be a separation between the monkeys' living place and their feeding place, and they had to cross the road, resulting in many roadkills. And therefore, they looked for another way. And unfortunately, some of our people fed the monkeys even more, resulting in their diet changing and they began to encroach into people's own areas. So, a simple solution: canopy bridges were built in several places and camera traps were installed. Movement of the monkeys and so on from their habitat to obtain food occurred. Roadkill was resolved, breeding and encroachment decreased. That is one method that we may be able to implement in urban areas, in any other urban areas, but I also think that we need to have the buffer zone mentioned by the Honourable Member earlier so that many— it actually comes from our forest reserve areas. It is actually adjacent to villages. The forest reserves came first, the villages came later. So, likewise in— I know that the Honourable Member for Jerantut raised earlier the Kampung Gol area, which was already raised during the Special Chamber session. So, it is adjacent. It is indeed an elephant corridor. An animal path. So, it is difficult for us to avoid the occurrence of conflict. In any case, I want to summarise that in terms of assistance or conflict, it is rather important for us to understand that it is necessary to have a coexistence between the two sides.
Elephant sanctuary, the Honourable Member for Sik did not raise it during the debate but I understand. An elephant sanctuary already exists in Johor. Johor Sanctuary. Elephant Sanctuary in Johor, but in Perak there will be one more, the Honourable Member for Gerik knows. You can ask the Honourable Member for Gerik, but God willing this will also help us implement a method of addressing conflict. Okay, I need to move on to the other topics, Mr Chairman. I have six minutes. I want to touch on the matter that was much discussed earlier regarding the RUUPIN. The Honourable Member for Simpang Renggam is here, there were several questions earlier regarding RUUPIN. Although this matter is actually related to policy, it is good to clarify it once again here regarding the National Climate Change Bill and the National Climate Change Authority Bill, or the Climate Bill.
On 15 July 2026, NRES submitted a memorandum to the Cabinet regarding the proposal for these two bills, both to obtain approval to table them in Parliament. [The Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee] The Cabinet agreed that NRES continue the engagement and coordination sessions with the Sabah and Sarawak State Governments until a common consensus is reached before both Bills are tabled in Parliament. Following that, NRES has carried out four engagement sessions with the Sarawak State Government between August and October 2026. Meanwhile, further engagement sessions, including with the Sabah State Government, yes, the Honourable Member for Penampang asked earlier, will continue in 2027. So, given that we still have challenges in obtaining agreement, but I hope, I expect that after the engagement with the Sarawak and Sabah State Governments is completed in a good manner, we can table it in the next meeting or sitting, God willing. This approach is important, Honourable Members all, because without this legal framework, we cannot have a governance structure for how we manage climate change in our country, including, as many Honourable Members mentioned earlier, the important National Carbon Market Policy. National Carbon Market Policy
was already approved in April this year and will be implemented next year. So this matter is important. If we do not have this governance, we have adequate policies, but they are not strong enough for us to sustain them or to ensure mapping, compliance, the existence of a registry, more accurate and higher-value carbon measurement methods. Regarding the matter raised by the Honourable Member for Kuala Nerus and also the Honourable Member for Tumpat about how effective green technology projects are at present. The Government has approved an allocation of RM3 million for 2027 for the Development of Technical Documents and Supporting Infrastructure for the implementation of RUUPIN and the National Carbon Market Policy. The implementation of this project covers the development of guidelines (MRV), monitoring, reporting and verification of greenhouse gas emissions for the scheduled economic sectors. The development of the Technical Documents will help the industry to improve preparedness and capacity to comply with the legal requirements of climate change, particularly those related to greenhouse gas emissions management and reporting, implementation of carbon market mechanisms, and compliance with carbon pricing instruments. And this initiative indirectly has the potential to benefit local authorities (PBT), IKS and communities through increased knowledge and technical capacity, exploration of opportunities to implement low-carbon technology, development of carbon projects, and green economy opportunities. Tumpat, please.
Thank you, thank you Mr Speaker. Thank you, the Honourable Deputy Minister. My question is, when we look at several states that are advanced in green technology legislation and also carbon credits, there are some states that may be lagging behind. So, what coordination will the ministry make to ensure all these states move in tandem, because we know this falls under both state and federal powers. So, if possible, we can move together, because this is an important future for the country. I seek your view.
Yes, thank you, the Honourable Member for Tumpat. Agreed, meaning there must be coordination between the Federal Government and the state governments. In this context, we actually already have the National Climate Change Policy or the National Climate Change Council.
This is where the coordination between the Federal Government and the state governments lies, because we have a Climate Change Policy, we have a National Carbon Market Policy, and God willing we will have a Climate Change Bill. Therefore, that coordination can take place at the Council level. Madam Chairman, time is short. I want to move on to one matter that I think is very important, which is regarding the level of government preparedness in facing the El Niño phenomenon. This matter has been much raised by Honourable Members.
Honourable Deputy Minister, before that, just one question, briefly. I got one only.
Okey.
I want to ask about this, perhaps also related to wildlife, about elephants. I have received many complaints from social media too. Our question is, because the other day the Minister had proposed to bring back all three elephants, namely Dara, Amoi and Kelat, from Zoo Taiping that were sent to Japan. We also want to know what their status is?
I will try to answer if there is time at the end, but I want to give priority to several more urgent issues related to government preparedness, the El Niño phenomenon, haze, which were much raised earlier by Honourable Members. Much was raised earlier, yes, but I think this was also raised a lot. So Mr Chairman, I have time...
Ringkaskan.
Please summarise, eh, can I give an additional five minutes?
Dua minit.
Two minutes, okay, thank you. Thank you Mr Chairman. Okay, to face the increasingly threatening El Niño phenomenon, NRES through METMalaysia continues to strengthen the Monitoring and Early Warning System on a continuous basis, 24 hours a day, 7 days a week, utilising meteorological data, weather radar satellite imagery, and weather and climate forecasting models. So there are many preparedness measures implemented, including providing forest fire and peat soil fire risk forecasts through the Fire Danger Rating System up to 7 days ahead using the Malaysia
Community Multiscale Air Quality (MyCMAQ) model, and we are also implementing cloud seeding operations in cooperation with NADMA, the Royal Malaysian Air Force (TUDM) and others. Strengthening this early warning system is the early warning system. We have 18 weather radars across the country. We will also improve forecasting capability through the Radar Integrated Nowcasting System (RaINS) and Numerical Weather Prediction system. These improvements also involve the use of high-performance computing technology, artificial intelligence and big data analytics. Under RMK13, the government has allocated RM56.48 million for six projects covering the development and upgrading of weather radars, automatic weather observation stations, numerical weather forecasting systems, and the modernisation of METMalaysia's ICT infrastructure. Finally, as I mentioned earlier, if there are any that I did not have time to answer, I will answer them in writing, Mr Chairman. So I would like to close with the following words, namely, I once again thank all parties, all the Honourable Members who have debated. I know I too used to debate, and was dissatisfied when I did not get an answer. Do not worry, God willing everything has been recorded and we will provide written answers within the set time. I also take this opportunity, Mr Chairman, to emphasise that the earth and all these treasures are a trust entrusted to us to be managed with wisdom and responsibility. So as khalifah on earth, we are not only responsible for enjoying the blessings of development today, but we also bear the trust to ensure that future generations inherit a healthy environment, a preserved natural resource and a more sustainable and resilient nation. Thank you, Mr Chairman.
Thank you, the Honourable Deputy Minister for Natural Resources and Environmental Sustainability. Honourable Members, the question is that the sum of RM1,598,804,000 for Head B.23 Operating Expenditure Estimates 2027 forming part of the Schedule be agreed to. [The question was put and agreed to] [Head B.23 ordered to form part of the Schedule]
The question is that the expenditure under Head P.23 Development Expenditure Estimates 2027 be approved. [The question was put and agreed to] [Head P.23 forms part of the Estimates of Expenditure]
Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.64 [Schedule] – Head P.64 [Development Estimates 2027] –Bill
Supply Head B.64 and Development Head P.64 under the Ministry of Higher Education are open for debate. The list of debaters is as follows; the Honourable Member for Raub, the Honourable Member for Arau, the Honourable Member for Putatan, the Honourable Member for Masjid Tanah, the Honourable Member for Kota Belud, the Honourable Member for Pengkalan Chepa, the Honourable Member for Pasir Gudang, the Honourable Member for Maran, the Honourable Member for Kepong, the Honourable Member for Penampang, the Honourable Member for Kepala Batas, the Honourable Member for Tuaran, the Honourable Member for Keningau, the Honourable Member for Kapar, the Honourable Member for Shah Alam, the Honourable Member for Batu, the Honourable Member for Sabak Bernam, the Honourable Member for Jelutong, the Honourable Member for Seputeh, the Honourable Member for Kangar and the Honourable Member for Pulai.
Each debater is given only 5 minutes. I invite the Honourable Member for Raub.
Thank you, Madam Chairman. First, I would like to welcome the Headmaster, the Senior Assistant Headmaster, teachers and pupils of SJK(C) Hillside in the Rasah Parliamentary constituency to the Dewan Rakyat. [Applause] Madam Chairman, I refer to Items 010100 and 010200. Starting 1 January 2026, the exemption for graduates with a First Class Honours Bachelor's Degree is only given to graduates of public universities from B40 and also M40 families. I would like to ask, are graduates of private universities from B40 and M40 families denied the same opportunity? Has a B40 child suddenly become rich because he studied at a private university? Madam Chairman, I have raised the issue of injustice in the public university admission system several times. There are SPM and STPM students who obtain excellent results, but fail to get a place in their chosen field because the university admission system is less transparent and also less fair. In the end they are forced to choose private universities. It is bad enough that they do not
get a fair opportunity to enter public universities; now they are punished once again when they complete their studies. If the government is worried about the difference in First Class Honours standards between public and private universities, we have the Malaysian Qualifications Agency (MQA). The MQA has also issued a document on the principles for awarding First Class Honours on 7 July 2026. Use the MQA to check academic standards. Do not simply reject all graduates from private universities. I propose that the government assess based on two matters, namely family income and academic achievement, not the type of university. Madam Chairman, the second issue, which is more urgent, is the plight of students who started their studies before 1 January 20206. When they began studying and took PTPTN loans, they were told that if they obtained First Class Honours they could apply for a repayment exemption. But now, when they are almost finished with their studies, the government has suddenly changed this condition, like changing the rules of the game while the game is in progress. Is this fair to them? They cannot go back in time to choose another university. On 3 November last year, the Second Finance Minister stated that the issue of earlier PTPTN loans would be studied together with the Ministry of Higher Education. I appreciate that response, but students need clear decisions, not just promises to study the matter. Madam Chairman, I urge the government to make two immediate decisions. First, retain the original conditions for students who have started their studies or signed PTPTN agreements before 1 January 2026. They must be given the opportunity to apply under the old conditions. Second, reopen the opportunity for graduates of private universities from B40 and M40 families who obtained First Class Honours to apply for the PTPTN exemption. Madam Chairman, I would like to raise an issue concerning student autonomy at universities. Recently, a group of students from Universiti Malaya revealed in the media that student associations now have to go through five layers of approval just to organise an activity. Although the programme was approved by the Students' Union, they still need to obtain various administrative approvals, the signature of an adviser, as well as
fill in a declaration form and an activity risk assessment form. Activities that use languages other than Bahasa Melayu also require a separate application. The university administration is increasingly bureaucratic. Even to organise a single activity, students have to go through layers of approval from the Student Affairs (HEP) department. Madam Chairman, we are talking about the repeal of the Universities and University Colleges Act (AUKU), but I would like to ask, what is the point of repealing AUKU if the culture of pressuring students is still maintained through university administration? Are students who are mature enough to vote at the age of 18 still considered immature to organise a forum, an activity, or invite a speaker, or to manage the finances of their own association? This is not student autonomy; this is bureaucracy hiding behind the name of administration. I hope the Ministry of Higher Education (KPT) will take three steps. First, eliminate the overlapping layers of approval. Give the Students' Union the power to approve association activities, giving students more space and not restricting their space. Second, affirm the freedom of student associations to manage finances, obtain sponsorship and open their own bank accounts, with clear mechanisms and SOPs. Third, stop all unreasonable administrative restrictions on the freedoms of speech, association and organising student activities. That is all, Mr Chairman.
Thank you, Honourable Raub. I call upon Honourable Arau.
Thank you, Madam Chairman. Malaysians, young people, Melakans, BN, PN. I refer to B.64, Item 020100 – Department of Higher Education. Honourable Minister whom I respect, I have already spoken on this title under the policy debate, but today I want to speak a little more specifically because it involves the PMX's statement in the budget, namely that the minimum salary for graduates is RM2,000, and for graduates RM2,500. This is a tremendous announcement, but its implementation is not yet visible.
Among those who assist these Members of Parliament's researchers are mostly people who have graduated from universities, but they are waiting, Honourable, for what work it is. Based on the DOSM Department of Statistics Malaysia (DOSM) statistics for 2024, 165,000 graduates are still unemployed, and of that number, 91,500 degree holders and 74,400 diploma holders are unemployed. Now, when the minimum salary of RM2,500 was announced, everyone was happy; on that day there was applause, from the table over there. We did not clap, but we know this is only an announcement. But in terms of reality, can they actually implement it? So we want to ask the Honourable Minister, the government now has MySTEP and PROTEGE. British pronunciation PROTEGE, American PROTEGE, but the same thing. Now, how many job opportunities have been created by MySTEP and PROTEGE? I have proposed that an Unemployed Graduate Scheme be established for one or two years, after which they are given the opportunity to be absorbed into permanent jobs and so on, but the current question is that even in universities, lecturers are worried that their students will graduate and have no jobs. Parents who send their children with PTPTN loans are hoping for something. In my day, before finishing university, work had already come, but that was a long time ago. At that time, not many people were working, so we were offered jobs; while sitting for exams we got jobs. But now it has been a year of unemployment, Honourable Madam Chairman, unemployed, with no work. So I ask that the government revive the Unemployed Graduate Scheme, and that the private sector or GLCs and GLICs that take these students to work, the government at least subsidise half, RM1,000 paid by the government, RM1,500 by the GLC or GLIC to employ them, including MySTEP. MySTEP pays higher salaries than PROTEGE, but what matters most is that they get jobs. It is something very unfortunate in Malaysia; young people all over Malaysia, and Melakans here, it is unfortunate that our children cannot get work and remain unemployed. Although the budget has been announced, they are still unemployed because we do not see anything the government can announce. Honourable Minister, now we are friends, Honourable, so I ask the Honourable Minister to please look into this, that something must be announced. We are friends with them now, Madam Chairman, no problem, not
for long; we can be friends with you, Madam Chairman, that is fine, no problem. With you, Madam Chairman, others do not want it, okay. So we ask the government to propose something to enable these people to get jobs, otherwise it is a very unfortunate situation. Then secondly, and lastly, Madam Chairman, because I am a person who keeps to time, just one minute to wrap up as usual.
At universities now, Honourable, when they leave university, I ask them, "When you left university, did you ever listen to religious talks or not?" "No." They say. "Were you ever made to go and perform your obligatory prayers, or...?" "No." These people, after the age of 18, enter university, and they consider themselves free, even though their religious education is lacking. So spiritual education is important. Therefore, Honourable, I propose that universities, mosques and surau organise spiritual programmes at least every week. Universiti Malaya does not have a mosque, Honourable Chairman. When I studied there long ago, the Honourable Chairman's parents had not even married yet, I think. At Universiti Malaya, there was one mosque. The mosque was beside the Universiti Malaya fence. That mosque was built on the basis that people from Kampung Kerinchi would come to pray together with university students. There were not many university students at that time. So that mosque was built. That mosque has become smaller. So, Universiti Malaya does not have a mosque. Build a mosque near Dewan Tunku Canselor, or somewhere in the middle, so that a mosque... every university has a mosque except Universiti Malaya. So I ask that this matter be given attention. Two— first, unemployed graduates. The second is spiritual programmes for the people of Malaysia...
Honourable, your time is up.
And thirdly, Honourable, let us all pray that BN-PN succeeds in Melaka. Thank you. Assalamualaikum.
Not relevant. Thank you, Honourable Arau. I call upon Honourable Putatan. None? I call upon Honourable Masjid Tanah.
Thank you, Madam Chairman. Masjid Tanah is debating at the Committee Stage on the KPT. So, the government has allocated a very large sum, namely RM19.09 billion for KPT for the year 2027. For this item, we see that the increase that has occurred is already large, but the question is whether, after billions allocated for our students, they obtain suitable employment, whether students from poor families can truly be given real opportunities, and whether our universities are free enough to produce thinkers and products who dare to challenge the weaknesses of government policy? Madam Chairman, I would like to refer directly to Item 050400 – Maintenance and Repair and Item 05018 – Facility Upgrading at IPTs. We want to touch on the student accommodation crisis. There are still many IPT students who have to look for alternative accommodation after being placed in residential colleges. Although they have accumulated very high merit, they still have to look for rented houses outside. This happens at IPTs located in urban areas such as UM, such as UiTM Seremban, which is pitiful, especially for students, particularly those from B40. They have to pay house rent, they have to pay for electricity, water and other related costs. They have to have their own vehicles or rent them, or rely on friends to take them to their respective colleges. If we look at Utusan Malaysia, it states that— on 26 August, there was a report that public university students had to rent outside campus because they failed to get residential college placements. Some had to rent and spend more than RM500 a month, and this is very, very worrying and very pitiful for students from B40 families. So, Masjid Tanah's question to the KPT: do universities provide a system or portal, or are there any efforts to obtain a centralised list of off-campus rentals, such as displaying rental houses for which they cooperate with owners of safe rental houses outside? And secondly, do universities provide
rental subsidies or emergency accommodation allowances for B40 students who do not get residential college places? Next, I would like to touch on the same matter that my colleagues earlier touched on regarding AUKU. We know that the amendment to AUKU will be made this December. So, in the Honourable Minister's winding-up, the Minister stated that among the matters to be studied in December 2026 are university autonomy, academic freedom, student rights and also the financial autonomy of student bodies. So, I welcome this effort. However, I would like to remind that university autonomy is not merely allowing students to organise programmes or manage association funds, but true autonomy must cover academic freedom, the integrity of university leadership appointments, and the freedom to criticise government policy without fear of pressure from the administration. If we look at the previous sitting of the House, when I debated and also gave criticism to a technical university in Melaka, eventually I and several friends were banned from entering that university because we raised and fought for the plight of lecturers who had been subjected to pressure. And when I asked how things are today, they are still in a state of great pressure. Although we know that the university administration has good relations with the national leadership— is that used as a ticket for the top university leadership to feel invulnerable because they have good relations with the national leadership? And this is something the KPT must look at so that politics in universities does not oppress students or lecturers within the university. I sincerely hope the Honourable Minister can give attention to this matter. I am sure and confident that the Honourable Minister, who is gracious and wise, understands what I am saying. Thank you, Honourable Minister. And finally, I would like to touch on the Youth Parliament. Is the selection of the Youth Parliament connected to the KPT in any way? I see that the issues raised by Youth Parliament Members largely touch on education, KPT policy and so on.
And I would like to ask, does the KPT have an official mechanism to examine the manifestos and policy proposals of the Youth Parliament, especially those involving the KPT? Secondly, is the government prepared to establish a response mechanism so that every KPT-related proposal passed by the Youth Parliament receives a written reply from the KPT within a stipulated period? And will the KPT be prepared to involve Youth Parliament representatives in consultations on the amendment of AUKU and in the implementation of the Malaysia Higher Education Plan 2026-2035? And finally, on the official portal of the Youth Parliament, of 526 Youth Parliament participants from 2015-2024, only five members succeeded in becoming State Legislative Assembly Members, and there is no alumnus yet who has become a Member of the Dewan Rakyat, based on the records stated on that portal. So, does this Youth Parliament truly have a long-term leadership development pathway, or is it merely a democratic training programme according to the KPT? That is all from Masjid Tanah. Thank you.
Thank you, Honourable Masjid Tanah. I call upon Honourable Pengkalan Chepa.
Bismillahirrahmanirrahim. Thank you, Madam Chairman. I want to touch on two matters in this Ministry of Higher Education that I think are very important for us to re-examine where the direction of the nation's higher education is really heading. The allocation of RM19.09 billion to the KPT for 2027 is a very large amount, but for me, the question is not merely how much we spend. The most important thing is the extent to which that expenditure truly changes the lives of students, helps lecturers produce knowledge, and gives universities room to grow. Because, in the end, we want to produce not only graduates who have degrees, but a generation capable of leading the nation's future. I refer to Item 020100 – Department of Higher Education, RM164 million. I note that in the Estimates of Expenditure Book, the employment rate of university graduates in the conventional year was reported as 69.4 per cent. What is interesting is that this figure of 69.4 per cent has been the same for four years, starting from
2022 until 2025. I want to ask the Minister, is this figure truly realistic in reflecting annual achievements, or are there weaknesses in reporting to the KPT, to the Honourable Minister?
There is something bigger than this figure, namely the study cited by the government showing that around two-thirds of new graduates who receive starting salaries below RM2,000, or 27.9 per cent, work in semi-skilled and low-skilled jobs. So, if we listen to the voices of students, they study for three years, four years, their parents sacrifice, some of them have to work part-time, tighten their belts, eat one meal a day. In the end, when they leave university, they wonder, with the degrees they have, how are they to build a life? We must not only ask how many graduates get jobs, we must ask how much they earn, what their salaries are, and whether that job is commensurate with their qualifications? I would like to propose to the Honourable Minister how the dual study system (duales studium) is implemented in Germany. Academic study is combined with structured industrial training. Students gain work experience and, in many programmes, they receive payment while still studying. While studying, they work, and they can generate income there. So, if this model, together with industry cooperation, can truly be implemented here, it would be very beneficial to students. I propose that the Ministry of Higher Education (KPT) introduce a graduate job quality index. Do not measure only the employment rate, also measure the median salary, the suitability of the job to the qualification, and the career progression of graduates. I want the Minister to explain what the target is for us by 2027, to improve the quality of jobs and the starting salaries of graduates? Secondly, Mr Speaker, I want to touch on Item 05011 – Fundamental Research. In the Estimates book, the original allocation for this item in 2024 was RM428.9 million, but for 2027 it is only RM57.5 million. A decrease of around 86.6 per cent. I want to know whether these funds have been transferred to other programmes or whether the funding for our basic research is indeed shrinking? We talk about AI, semiconductors, biotechnology and also future technologies,
but how are we going to become a nation that creates technology if basic research does not receive funding or a stable budget? I also want to bring the voices of university lecturers and researchers today. They are not only teaching, they have to supervise students, apply for grants, produce publications, meet KPIs and manage all kinds of administrative demands. Let us not reach a point where lecturers spend more time proving that they are doing research than actually doing the research itself. And we also need to understand the position of university administrators. They are asked to improve teaching quality, strengthen research, look after student welfare and maintain campus needs, but at the same time, they must manage limited allocations and various financial directives. So, we can ask— can we simply demand high performance without providing reasonable resources and management space? Mr Chairman, I will end with one matter which I feel is bigger than the two items I raised earlier, namely that we always talk about higher education from the perspective of the ministry, policy, allocations and also KPIs, but do we truly listen to the voices of students who live in colleges, lecturers' housing who teach every day, researchers who face laboratory constraints, and university administrators who work tirelessly to ensure the institution continues to function. I propose the following, KPT... [Interrupted]
Ringkaskan.
...Establish a permanent policy legislative mechanism, involving representatives of students, lecturers, researchers and also university administrators. That is all I want to say, Mr Chairman. Thank you.
Thank you, the Honourable Member for Pengkalan Chepa. I invite the Honourable Member for Pasir Gudang.
Thank you, Madam Chairperson. I refer to Item 020000 – Higher Education and also Item 020100 – Department of Higher Education, whose estimate for 2027 increases to RM164,030,900.
Madam Chairperson, under the Department of Higher Education, there are 20 public universities, starting from Universiti Malaya to the last item, 022100 – National Defence University of Malaysia (UPNM). In my debate, I want to draw the attention of the Honourable Minister to private universities that have been set up in our country in great numbers, like mushrooms after the rain. For example, in Iskandar Puteri, in the Iskandar Malaysia Economic Corridor area in Johor Baharu, so many private universities have been established. I believe in Kuala Lumpur, Cyberjaya, in Melaka and in Putrajaya there are also private universities. In this regard, Madam Chairperson, I refer to Item 010200 – Malaysian Qualifications Agency (MQA), which is related to these private universities. My question, Honourable Minister, how many private universities are there in Malaysia now? Secondly, how many students do they have? Thirdly, from which countries do these students originate? My next question is, what is the legal basis that allows private universities to be established in Malaysia, under which act? There must be an act. Does that act need to be amended or reviewed? Next, I want to know, does the Ministry of Higher Education have the jurisdiction to control these private universities? My question, are private universities not bound by the national education policy? I would like to know, Madam Speaker Chairperson, what is the policy or guideline on private universities in terms of the medium of instruction used? The types of courses offered at these universities. Thirdly, in terms of accreditation (tauliah). Then, regarding the tuition fees, who determines them? Likewise, the monitoring by the authorities to ensure that private universities operate in line with the country's policies and aspirations, not contrary to them. Perhaps it is also worth knowing about the operating licence, who issues it? Next, Madam Chairperson, to whom are these private universities accountable? Which party truly has power over these private universities? And I also want to know what benefits the country gains economically and socially from these private universities? And lastly, Madam Chairperson, I want to know the development of private universities in Malaysia. Are they moving forward and making a good contribution to our country in the world of education? That is all, Madam Chairperson, thank you.
contribution to our country in the global arena of education? That is all, Madam Chairperson, thank you.
Thank you, the Honourable Member for Pasir Gudang. I invite the Honourable Member for Maran.
In the name of Allah, the Most Gracious, the Most Merciful. May peace and the mercy and blessings of Allah be upon you. Peace be upon you. Thank you, Honourable Chairman. I refer to Head B.64 (Bekalan) and Head P.64 (Perbekalan) – Ministry of Higher Education, which receives RM19.09 billion for 2027.
RM15.13 billion for operating expenditure and RM3.96 billion for development. However, the development allocation has only increased by 1.1 per cent. I do not want to repeat the big announcements we have heard. I want to examine one question. After the money is approved, what decisions truly bring benefits to students and the people? I raise several issues, from access to education to the quality of employment. Madam Chairperson, Maran Community College, after the land answer, where is the construction plan? I refer to P.64 Item 04800 – Community Colleges. On 27 October, the Minister explained that the site at Kampung Bak Bak, Mukim Luit, measuring 5.235 hectares, belongs to the Federal Government and there is no valid lease for oil palm management. I do not have a question on land ownership, the matter not yet answered is the action after that management. My question is, what enforcement action and what date for handing over the site free from obstacles for development? Secondly, is the permanent Maran campus listed in the Rolling Plan 2027 under Item 04800? If not, what approval conditions are still unmet and when will a decision be made? Next, after the question of access, let us look at the condition of facilities at the campus already in operation. UiTM Jengka, tenders have been issued, when will students benefit? I refer to P.64 Item 02100 – UiTM Jengka and also Item 05018 – Facilities Upgrading, which increased from RM41.6 million to RM91 million, and also announced RM800 million for university infrastructure. At UiTM Jengka, the tender for upgrading the Academic Block J building, Package 1(C), is scheduled to close tomorrow, 12 November. This is good progress, but I want to know,
under which item is the Block J project financed? What is its value and what is the schedule for contract award and completion? What portion of the RM800 million is for UiTM's Pahang branch by campus and project? ICT on campus, the budget has been reviewed, what is the result? I refer to P.64 Item 05015 – ICT Strategic Planning with RM83.1 million for 2027. My question, in 2024, the original allocation of RM85.1 million was revised to RM1.9 million. My question, which projects were postponed, cancelled or refunded through other items following the 2024 revision? For the RM83.1 million in 2027, what are the measurable targets for the continuity of the digital system and the completion dates by campus? Turning from expenditure to the strength of knowledge produced at universities, fundamental research, funds are shrinking. What is the status of the remaining grants? I refer to Head P.64, Item 05011. The allocation for 2007 has fallen from RM117.6 million to RM57.5 million. At the same time, the Auditor General's Report 2026 raised the remaining research grant balance of RM110.67 million in five research universities. I note that the Ministry of Finance approved the reuse of the balance on 11 February 2026. I would like to ask why the fundamental research allocation has been reduced by 15.1 per cent in 2027 and how many research projects that were planned earlier have been cancelled, as well as new projects and existing projects that will be financed? Secondly, from the RM110.67 million grant balance raised by the Auditor General, how much has been distributed and spent again up to 31 October 2026? Honourable Chairman, graduate employment. How much is the salary and how long does it last? I refer to Head B.64, Item 020100 – Department of Higher Education. I would like to ask what is the basis for reducing the employment target of public university graduates from 86.4 to 80 per cent? Is this change due to actual performance or a review of measurement methods? Secondly, what is the median salary of 2025 graduates by field of study and what is the KPT target for increasing income and employment commensurate with qualifications in 2027? How many foreign students are filling the vacant job spaces in this country, and from which of the 51 source countries are the sources of employment in our country?
vacant job spaces in this country? And from which of the 51 source countries that are the source of employment in our country?
Thank you, Honourable Member.
Madam Chairperson, I am not asking the Minister to repeat the policy— just a little. I ask that the decisions on amounts and dates be reviewed next year, because the success of a budget is not when money is announced, but when benefits reach the ordinary people, especially students.
Thank you, the Honourable Member for Maran. I invite Kepong.
Finished, last one. Paddy turning yellow at the edge of the field, Water flowing to the end of the village; Do not merely look at the figures, Let the people live in prosperity. Thank you.
Terima kasih.
Thank you, Madam Speaker. The Ministry of Higher Education receives RM19.09 billion for next year, an increase of 2.6 per cent, but the development allocation rises by only 1.1 per cent. The people have the right to demand convincing results from this large figure. First, China has abolished admissions for 12,200 Bachelor's Degree Programme offerings throughout 2021 to 2025. Among the fields restructured in several universities are translation, photography and visual communication design. Malaysia, meanwhile, has reviewed 455 programmes. How many have truly been abolished, merged or renewed to face the AI era? Disclose the list. The World Bank estimates that 45 per cent of Malaysian workers do jobs whose tasks can largely be taken over or assisted by AI. Although not all will lose their jobs, the government must act now. I propose a reskilling scheme before workers lose
their jobs due to AI. Do not wait for the people to become unemployed before the government busily looks for solutions. Secondly, graduates have high qualifications, but many work in positions that are not commensurate. DOSM reported that 35.2 per cent of higher-educated workers work in semi-skilled or low-skilled jobs in the second quarter of this year. I ask the ministry to disclose the employment rate after qualifications and the actual salaries of graduates by each degree programme. The ministry can refer to Australian practice. The results of graduate employment must become the basis for improving courses and industrial training. Do not just boast about the number of graduates who are employed. Thirdly, PTPTN arrears have reached RM10.7 billion involving 1.16 million borrowers as of August this year. I welcome the deferment of repayments for low-income borrowers in the Budget 2027. However, a long-term solution is still needed. I propose that Malaysia study the Australian and British systems, where education loan repayments change automatically according to the borrower's income. Low income, low payment. When income rises, payment also rises. Fourthly, Item 05011 – Fundamental Research was cut by 46.6 per cent from RM107.65 million in the revised estimate this year to RM57.5 million. Item 05012 – Scholarships and University Research Training increased by only RM1 million to RM203 million. The government announced RM6 billion for research and innovation next year. I want the ministry to disclose how much actually reaches the universities? How much is co-financed by industry and how will the results be measured? The Auditor General's Report previously raised the RM110.67 million research grant balance in five universities. How much has been reused and what are the results? Prove how that research produces local technology, solves the people's problems and creates high-paying jobs. Fifthly, Item 05015 – ICT Strategic Planning received RM83.14 million, but the target for digital service availability is only 90 per cent. Without achievement data for the previous two years, what is the basis for this target? I ask the Minister to answer all these questions with figures and evidence. That is all, thank you.
Thank you, the Honourable Member for Kepong. I invite the Honourable Member for Penampang.
Honourable Chairman, under Item 02100 – Universiti Malaysia Sabah (UMS), RM347.795 million is allocated, and under Item 04200 – UMS, RM150.592 million is allocated. I once again wish to touch on the issue of medical officers who do not report for duty in Sabah. In my view, the main reason is not only the issue of facilities, but also the desire to serve close to family or in their own state. Therefore, I would like to propose that the Ministry of Higher Education, together with the Ministry of Health and the Public Service Department (JPA), take proactive steps, working with the Sabah State Government, to establish a specific policy to overcome this issue. I propose that admissions to UMS's Faculty of Medicine be given to local Sabah children, who are given scholarships or JPA sponsorship as announced in the Budget speech, and are then placed to serve in Sabah. I also hope that UMS will not only produce marketable graduates, but also develop new courses that suit the needs of industry in Sabah. Chairman, under Item 021200 – Universiti Teknologi MARA (UiTM), RM2.325 billion is allocated. I would like to ask about the ministry's plans regarding UiTM's Tawau branch following the speculation circulating in Sabah about the possible closure of this UiTM branch. What exactly are the ministry's plans regarding this UiTM Tawau branch? Chairman, as a university graduate and as an Alumni of Universiti Teknikal Malaysia Melaka (UTeM), I am proud of UTeM's membership in the National TVET Council, which is a recognition of the country's TVET higher education. In line with the national agenda, TVET courses are also provided by various TVET training institutions across the country, whether at skills certificate level or at diploma level. I propose that the ministry consider the proposal that TVET skills certificates be issued jointly by universities together with these TVET training institutions. For example, UTeM or UMS could collaborate with Montfort Youth Training Centre (MYTC) to issue skills certificates to the
...its graduates, or MYTC, may choose university partners, including private universities within the country, to issue skills certificates to the graduates under its guidance. Of course, this involves meeting standard added-value requirements and also injections of funds from the government through the National TVET Council or the Ministry of Human Resources, which can support strategic collaboration between TVET training institutions and those universities. Mr Chairman, under Item 05012 – Scholarships and University Research Training, RM203 million has been allocated for 2027 compared with RM202 million this year. I would like to ask, how many students in total, or beneficiaries nationwide, received scholarships under this item last year and this year? And of that total, how many recipients were from Sabah, and how many recipients were from among Orang Asli students in Peninsular Malaysia? I hope these scholarships can be extended to the children of Sabah and the children of Orang Asli communities who take Ethnic Language studies at Sultan Idris Education University (UPSI) and Universiti Malaysia Sabah (UMS), in line with Malaysia's support for the United Nations Declaration on the Rights of Indigenous Peoples. I also hope the ministry will consider establishing an Ethnic Language Studies Chair at UPSI as a manifestation of that support, and that the government may contribute an endowment fund to that Chair. Mr Chairman, I also want to ask, what is the problem statement to be addressed in the new law replacing the Universities and University Colleges Act (AUKU) that has been announced for repeal? Will it cover new matters, or will it be the existing law with only a new title? As a former member of the National Student Representative Council, I would like to propose that this Council be institutionalised and included in the said bill, and that the Prime Minister, or at least the Deputy Prime Minister, be able to chair the Council's meetings, which should also be attended by Ministers who hold portfolios related to student interests. Mr Chairman, that concludes my speech. Thank you.
Thank you, Honourable Penampang. I invite the Honourable Kepala Batas.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Madam Chairman. Parents sacrifice to send their children to university; the government should ensure that this sacrifice does not end in hardship and uncertainty about the children's future. Therefore, on that basis, Kepala Batas will bring up five matters, the first under Item 05018 – Upgrading of Higher Education Facilities. Kepala Batas notes the Vista Kampus initiative, which involves KWAP investment of RM750 million. However, it must be emphasised that KWAP investment is not a direct development grant of the ministry. The question is, does this project truly solve the problem of student accommodation, or does it merely add to property assets? Let us not build beautiful student housing while poor students can only look at it from outside the fence. Kepala Batas, for three basic policies: first, affordable rents, priority to low-income students, and open reporting on the capacity and recovery methods of the university. The ministry should also set a benchmark for rental affordability based on the socioeconomic circumstances of students, because higher education should not force young people to choose between paying rent or buying food. Second, under the same item, Item 05018 – Upgrading of Facilities, focuses on the rights and education of disabled (OKU) students. Kepala Batas reminds that a university cannot be considered excellent if there are still disabled students facing obstacles in entering lecture halls, using toilets or obtaining suitable accommodation. Disabled students do not ask for sympathy or special treatment; they only want equal opportunity to study, move about, live in residential colleges and complete their studies with excellence. They claim the right to learn safely, comfortably and with dignity. The question is, what portion of the allocation under this item is used for disability-friendly facilities?
Therefore, Kepala Batas proposes regular accessibility audits at all Public Higher Education Institutions, and that a portion of the higher education facility upgrading allocation be clearly identified to improve physical access and learning assistive technology. The ministry should report on implementation progress based on the level of compliance and the actual needs of disabled students. Let us not talk about world-class universities when there are still citizens who cannot enter a classroom without the help of others. Next, Item 0400 – Technical and Vocational Education and Training (TVET). Kepala Batas welcomes the attention given to technical and vocational education and training. However, the important question is, to what extent is this investment translated into quality employment? Young people holding Malaysian Skills Certificates, especially Levels 1 to 3, must not be treated as second-class workers. They have skills and abilities, but does the job market give them recognition and rewards commensurate with them? In labour market studies, this situation is closely linked to the problem of skills mismatch, or the disparity between job skills and job requirements. Therefore, Kepala Batas proposes that the ministry publish three key indicators for TVET graduates: employment rate in the field, starting income and career progression after graduation. We do not want merely to celebrate graduates getting jobs when the wages received still cannot sustain a living. Item 05015 – Strategic ICT Planning. In modern higher education, laptops and the internet are no longer luxuries. Both are basic necessities for learning, but not all students have the same capacity. Some students have complete devices and fast internet access, while others have to share a computer with siblings, or even rely on mobile phones to complete assignments. How can we talk about educational equity if basic learning facilities are still unequal? Therefore, Kepala Batas proposes targeted assistance of devices and internet access for low-income students, especially rural students and distance learners. The ministry should measure the effectiveness of this assistance based on participation and learning achievement, not merely on the number of devices distributed.
Do not let the digital divide ultimately become a divide in the future. Finally, Item 03000 – Teaching Hospitals. This issue is very close to parents. Consider how parents who spend years financing their child's studies in the health field know that the cost is not cheap. The child studies earnestly, undergoes training, passes examinations and finally obtains professional qualifications.
But after graduation, a new question arises. When will placement opportunities come? Where is the direction of their career heading? Kepala Batas wishes to stress that the output of health graduates must be planned based on the actual needs of the national health system. The special allocation for the field of study stated must be evaluated from the standpoint of the quality of clinical training and the development of professional manpower, and not be equated with the allocation for hiring workers. Kepala Batas requests that the Ministry of Higher Education and the Ministry of Health jointly develop projections in the health field for a period of five to 10 years. Finally... Jasmine flower at the edge of the town, Fragrant and sweet in the morning; A child of Melaka, learned and ambitious, The blue wave continues to serve. Thank you.
Thank you, Honourable Kepala Batas. I invite the Honourable Tuaran.
Thank you, Mr Chairman. Tuaran debates the Supply Head B.64 and Development Head P.64 of the Ministry of Higher Education, with a focus on the opportunities for Sabah children to study and on the need for professional manpower in Sabah. When a child receives a university offer, the whole family in the village is also happy. But then parents calculate whether there is enough money to send them? We want to ensure that the child can register, complete their studies and build a better life. The first matter Tuaran wishes to debate is Item 020100 – Department of Higher Education. Tuaran proposes that poor students be identified as soon as offers are issued, so that initial assistance is received before registration.
Allow them to register while financing is being settled. Please contact these students who have not registered to learn of the problems and the assistance they need. Living allowances must be paid according to a certain schedule. As for FLYsiswa, the journey of children from the interior of Sabah begins from the village, not straight to the airport. Accordingly, this must be taken into account, yes, align assistance with the academic calendar and arrange affordable student fares together with the relevant parties. The second is Supply Item 021000 and Development Item 04200 – Universiti Malaysia Sabah. Tuaran asks that the establishment of the UMS Faculty of Law be expedited. Government approval was announced in November 2025, followed by the announcement of the UMS market study in June 2026. That is why I ask the Honourable Minister to state the status of implementation and the allocation for preparations and the target for the first intake. This faculty must offer strong legal education with specialisation in the Federal Constitution, matters relating to the formation of our nation Malaysia, Sabah land law and Sabah customary law, in view of the fact that the Sabah Native Court Enactment has now been passed and enforced. So, ensure that academic staff, accreditation and professional recognition are provided so that career pathways for graduates are clear. Also establish cooperation with a state court institute to strengthen the training of state court officers. We want university expertise to help the public understand their rights and obtain solutions to their problems. The third, still under the UMS allocation. Tuaran also wishes to support the proposal of the Honourable Penampang earlier regarding the addition of medical study places for qualified Sabah children. To address the shortage of doctors and the difficulty of attracting and retaining medical officers from outside Sabah. We need to train more local children, so this is a long-term investment for health services in Sabah. I also ask the Honourable Minister to state the number and percentage of Sabah students in UMS's existing medical programme, the target for increase and the implementation of intake sessions. Additions of places must be accompanied by sufficient lecturers, clinical supervisors and training facilities to ensure that quality
of education is maintained. Also provide targeted scholarships for qualified Sabah children, continuing for those from low-income families and from the interior. The ministry needs to cooperate with the Ministry of Health and the Sabah State Government, as also proposed by the Honourable Penampang earlier, to provide training pathways and placements in Sabah. Consider service bonds for scholarship recipients so that this investment helps meet Sabah's needs. The fourth is basic facilities at UMS. Out of approximately RM150.6 million in development allocation for 2027, state the breakdown of projects and implementation schedule. Explain the status of water supply and the remaining work required, because water supply matters still haunt students and residents at UMS. Accommodation should prioritise poor students and those from the interior so that families are not burdened with additional rent and transport. Madam Chairman, Sabah needs educated children who can build the future of families and contribute to the state. Help them enter university, provide quality education and open the way for them to serve. This is what we want to resolve for the people of Sabah. That is all, thank you.
Thank you, Honourable Tuaran. I invite the Honourable Kapar.
Thank you, Mr Speaker. Bismillahirrahmanirrahim, thank you, Mr Chairman. I begin the debate on the Supply Bill 2027 for the Ministry of Higher Education at the Committee stage for 2027 for Supply Head B. and P.64, totalling RM19,085,572,100 in all. Budget allocations to the MOHE show an increasing trend in operating and development expenditure from 2023 to 2027. RM11.7 billion in 2023 rose to RM15.129 billion in 2027. I refer to B.64 Item 050400 – Campus Maintenance, which is said to be a priority, but its funding has dropped by RM70.7 million. A question to the Minister. The House approved the MOHE operating allocation for 2026 amounting to RM14.68 billion. How much has been withheld from the MOHE through the directive of the Ministry of Finance dated 29 April 2026?
And how much is the value of outstanding maintenance work at MOHE institutions, because of the amount that has been reduced and withheld? I also refer to Development Project Item 00400 – Polytechnic Education, P.64 RM385,990,500, then community colleges, and also 0501 – Scholarships and University Research Training, RM203 million. Mr Chairman, there is actually a lot I want to touch on, but since time is short, I must focus on the matters that are closest to my heart. So, about polytechnics and community colleges. How many polytechnics and how many TVET institutions are there in Kapar? Why? I am raising a very important matter for the future of the nation's higher education, particularly from the perspective of the Kapar Parliamentary constituency, namely: to what extent is the TVET higher education system truly preparing and producing the human capital needed by the national economy? In Kapar, Mr Chairman, there are about 46,000 people aged 15 to 30, not 25, not 24, approximately. So, perhaps 10 per cent of them are eligible to undertake vocational training, enter polytechnics and so on. So, I ask the ministry, is there or isn't there? What is the timeline so that Kapar has TVET, has something other than GIATMARA, which is the only one in Kapar, and which is very small. Because we— Kapar has economic advantages that cannot be taken lightly. We have industrial areas including Kapar Bestari, K International Industrial Park, in addition to a strategic location near Pelabuhan Klang, Northport and Westport. So, this area needs skilled manpower in mechanical and electrical engineering, industrial automation, robotics and mechatronics, CNC machining and industrial maintenance, logistics, warehouse management and supply chain maintenance of heavy vehicles and port equipment, information technology, cyber security and industrial systems. Question to the ministry. What is the point of attracting billions of Ringgit of investment to the Kapar area if high-skilled job opportunities end up being filled by foreign workers because local children do not have the required qualifications? We do not want industrial development to only bring profits to investors, including foreign ones, while local children remain mere spectators.
So, I ask the ministry to please answer. Please agree. I ask that you agree to study the establishment of a community college or a TVET satellite campus in Kapar. I propose three approaches. Industry-led TVET, involving employers and industry operators in determining the co-curriculum and skills needed. Paid apprenticeships, where students undergo real industry training with allowances and placement pathways. Let me add a little more, Mr Chairman. Micro-credentials, providing short courses for SPM school leavers, unemployed youth and those who have dropped out of formal education. The ministry also needs to ensure that training fields do not lag behind technological developments such as artificial intelligence, automation, renewable energy and industrial certification. Finally, Mr Chairman, the ministry— we want a paradigm shift in the assessment of the success of educational institutions. So, we want the ministry to measure what percentage of graduates get jobs within six months? How many get jobs that match their qualifications? What is the median starting salary of TVET graduates? How many local children have been successfully placed in industries around Kapar? So, do not only look at the big ones, but the local ones must need the government's focus.
Terima kasih.
Finally, industrial development...
Thank you, Honourable Member.
...must go hand in hand with human development and sustainability. Thank you, Mr Chairman.
Thank you, Honourable Kapar. I invite the Honourable Shah Alam.
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, greetings of Malaysia MADANI. Thank you, Madam Chairman. For the purposes of Supply B.64, Item 021200 – Universiti Teknologi MARA (UiTM), totalling RM2.326 billion, and for the purposes of Development P.64, 01900 – Universiti Teknologi MARA (UiTM), totalling RM979 million. I will focus my debate on UiTM this afternoon.
UiTM once owned the INTEKMA Resort and Convention Centre, a three-star facility in Seksyen 7, Shah Alam. It began operations around 1989 and, for almost 30 years, served the hosting of various events, courses, seminars and functions, wedding events and much more. INTEKMA Resort fully ceased its hospitality operations on 31 March 2019. From February 2023, the Deputy Vice-Chancellor for Student Affairs (HEP) announced a proposal to convert INTEKMA Resort into a residential college capable of accommodating between 500 and 1,000 students. In fact, Honourable Chairman, apart from accommodation, INTEKMA also has an event space, a banquet hall that can hold 500 people and a marquee tent hall that can hold 1,000 people. That means, in terms of financial generation, it has very great potential. My question is, what is UiTM's plan for this premises? Will it be refurbished or redeveloped? If so, what is the implementation timeline? I am worried that if it is left for too long, the building will become very outdated, and refurbishment would also involve high costs. What I am more concerned about is if it is transferred to another party whose development does not directly benefit this bumiputera educational institution. UiTM is a Malay institution that has provided many opportunities for higher education that have enlightened many Malay and bumiputera children. Unfortunately, UiTM is also not exempt from being tainted by cases that tarnish the dignity of the Malays. Recently, it was reported that the top management of UiTM Holdings was charged with criminal breach of trust in a solar investment project in Gambang. The case is still under trial, but I very much hope it becomes a lesson on the framework for uplifting a dignified Malay community. To me, a dignified Malay is a Malay who is knowledgeable, skilled, has assets, is self-reliant in the economy and upholds trust. We want Malays who are progressive and able to compete without denying the rights of other races. We want effective empowerment policies, not mere political rhetoric. We want Malay institutions to be preserved through good governance, not left to weaken due to mismanagement and misappropriation. Mr Chairman, for the purpose of Development P.64 Item 05011 – Fundamental Research. The allocation has been reduced from RM107 million to RM57 million, which is nearly half of the previous year's allocation. Estimate
Federal Expenditure 2027 outlines the programme outcome performance for higher education. Activity 12 states that the function of UiTM is to advance knowledge and learning through research and quality education for the nation and humanity. Fundamental research is the foundation for the development of knowledge, innovation and the nation's intellectual capacity. It is not merely research that yields commercial returns in a short period, but also opens space for new discoveries that can become the basis for technology and problem-solving in the future. In the global economic competition, a nation that wishes to develop a high-technology industry cannot rely on foreign technology forever. We need local researchers, strong laboratories and a research ecosystem capable of producing high-level knowledge and technology. So, what is the ministry's justification for reducing this fundamental research allocation by 46.6 per cent? How many research grants and projects are expected to be affected by this reduction, particularly for UiTM? Are there alternative funding sources to ensure that basic research in public universities is not compromised? I suggest the ministry explain the funding plan for fundamental research for the next five years so that researchers have certainty and do not have to depend on an uncertain annual allocation. Finally, Madam Chairman, we cannot aspire to become a high-technology nation if investment in knowledge production and basic research continues to shrink. Thank you.
Thank you, the Honourable Member for Shah Alam. I invite the Honourable Member for Sabak Bernam.
Assalamualaikum warahmatullahi wabarakatuh. Greetings, good afternoon. Mr Chairman, I would like to examine Item 050400 – Maintenance and Repair. First, I would like to touch on the allocation for the Ministry of Higher Education (KPT) for 2027, announced at approximately RM19.09 billion compared with RM18.6 billion in the previous year. I welcome
the increase in this allocation because higher education is a strategic investment for the nation. However, in assessing a ministry's budget, we should not only look at the large allocation figure but must examine the extent to which the allocation is translated into real benefits for students, universities and the development of the nation's human capital. Therefore, I also have experience of studying. If student accommodation is not adequate, then their learning will also be affected. At that time, some rented houses in squatter areas and so on, rented flats in Kampung Kerinchi, and had to do assignments using typewriters, creating a noisy atmosphere. Sometimes they quarrelled with the neighbours next door. Therefore, I very much agree that if the government wishes to provide accommodation needs for our students at universities, so that they can study to the maximum there with their fellow students. In this regard, I would like to draw attention to the fact that the RM800 million allocated for upgrading higher education infrastructure must be ensured to reach the actual needs on the ground.
Second, the issue of student accommodation through the Campus Vista Project and Student Residences at the University of Malaya. I welcome efforts to provide more student accommodation. However, the announcement of an investment of RM750 million through KWAP for Kampus Vista— Vista Kampus raises questions about the actual cost of construction, capacity, accommodation, leasing structure and the rental rates that will be charged. We must ensure that the commercial financing model does not ultimately shift the burden to students, especially those from the B40 group, Mr Chairman. I would like to compare the Campus Vista Project, involving RM750 million from KWAP, with six public universities whose locations have not yet been determined. There are no statistics yet on which universities need it, how many beds are to be built, yet the RM750 million allocation from KWAP is already in place. And also the University of Malaya Student Residences Project. The University of Malaya Student Residences introduces four categories of accommodation: standard for 10 occupants, premium standard for six occupants, apartments for three
occupants, and studios for one occupant. So, if we look at the model of the University of Malaya Student Residences, only one category, namely the standard for 10 people, is suitable for B40. Meanwhile, the premium standard for six occupants may be suitable for M40. And apartments for three occupants are for T20, and the studios for single occupants are for the children of the rich. So, if this is the model we use, then the problem of occupants, students from B40, will not be resolved. And whether those occupying the studios are students who are already married, or already working, so that they can afford to pay, this also needs to be clarified. Some of my friends, including Members of Parliament, also rent only studios. That means the status of students is now like that of Members of Parliament. Next, I would like to highlight, yes. I would like to touch on the involvement of the Retirement Fund (KWAP) in the Campus Vista Project, which was announced with the investment mentioned earlier, yes. I would like to remind this august House that KWAP has previously faced investment controversy in an Indonesian aquaculture technology company, eFishery, amounting to RM163.7 million. That company was found to have committed wrongdoing and was subjected to action by Indonesian authorities, and once again we use money from KWAP...
Sila gulung.
Alright, Chairman. To build Kampus Vista. So, I am worried because we have not even conducted a study yet on the needs of those six universities, but we have already taken the money and fixed it at 750. And why, yes, we allocate 19.09 billion for higher education, but why take KWAP's money again? That is what I find puzzling. Why not simply take money from the allocation given of 19.09 billion?
Okay, thank you, the Honourable Member for Sabak Bernam.
You're welcome, Mr Chairman.
I invite the Honourable Member for Jelutong.
Thank you, Madam Chairman. I rise to also debate, and I refer to the item that
was given, Item 02000, namely Education. Yes, Item 020000 – Higher Education. I would like to raise matters concerning the Faculty of Law, University of Malaya. I understand that students who enter through the UPU system pay only RM1,260 for one semester, compared with students who enter through the open route, who pay approximately RM10,000 for one semester. I would like to seek an explanation from the Minister as to why this occurs and why the payment gap for the semester is so different, compared with UPU students paying only RM1,260 for one semester, compared with the open route at the University of Malaya, which pays— which pays a much higher amount. And I also see, Madam Chairman, if we look at the books that have been provided, in all— I read for example, Madam Chairman. Universiti Kebangsaan Malaysia, advancing knowledge and learning through research and quality education for the nation and humanity. Universiti Sains Malaysia, advancing knowledge and learning through research and quality education for the nation and humanity. The University of Malaya is the same too. Universiti Teknologi, advancing knowledge and learning through research and quality education for the nation and humanity. Not one of these universities places emphasis on amanah (trustworthiness), integrity, combating corruption, and upholding trust in the service they will enter, whether in the public service or the private sector. Here I would like to take the conclusion of a graduate named Ummi Umairah, a female student pursuing a Bachelor of Economics at the University of Malaya. Recently, she received various criticisms for making a critical statement at an open forum regarding the act of donating money to help former Prime Minister Datuk Seri Najib Tun Razak. I request that she be made a national graduate icon. I take this opportunity because we see that our graduates, our students— students and graduates must be given— must be given priority. They must be given priority to become graduates with integrity so that we combat wrongdoing, abuse of power, corruption, breach of trust and so on.
So, I take this opportunity to ask the Minister. Is the Minister willing to confirm that Ummi Umairah will be made a national student icon because of her very brave stance at a recent forum, where she firmly stated that the act of giving a donation of 50 million to pay the fine of a former Prime Minister was an act that she felt was not wise to carry out. And I want to ask here also. Are we going to overhaul and re-legislate all these universities so that the core of education at all these universities focuses on integrity, trustworthiness, so that they are clean, so that they are not swayed by corruption. I see that in recent times only attention has been given to academic qualifications and not to noble values such as integrity, trustworthiness and also combating corruption among all students. So, I want to ask the Minister. The government's commitment to ensure that every graduate who obtains a degree from all local universities ensures that, upon receiving their degree, they will become workers in either the private sector or the public service who will carry out their duties cleanly, efficiently and with trust. Thank you, Madam Chairman.
Thank you, the Honourable Member for Jelutong. I invite the Honourable Member for Seputeh.
Thank you, Madam Chairman. I would like to refer to Item 010200 – Malaysian Qualifications Agency (MQA), Item 020100 – Department of Higher Education.
Madam Chairman, I would like to raise the issue concerning 34 students who have completed their studies through the collaborative programme between Stamford College Melaka and Lincoln University College (LUC), where these students still have not received their academic certificates since 2022 until now. Of this number, 23 students are recipients of PTPTN financing. This delay has affected their opportunities to obtain
employment commensurate with their qualifications or to pursue further studies, as well as to repay their PTPTN loans. Based on information I have received, the Bachelor Honors in Business Administration programme of Stamford College Melaka has obtained MQA approval under number MQA/PA/15621 and approval from the Ministry of Higher Education under number N/0414/6/0012, while the Bachelor of Science Honors in Hospitality Management programme submitted an application to MQA on 20 January 2021. [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) chaired the Committee] I understand that Stamford College Melaka and its students had sought assistance from the Ministry of Higher Education, but their appeals have not been addressed to this day. I have written a letter to the Honourable Minister concerning the problems faced by these students, and I request the good offices of the ministry to intervene to find a solution for these 34 students to obtain their degrees for the sake of their future. Madam Chairman, based on official data from the Ministry of Higher Education (KPT) data collection system, as of 31 December 2025, there were a total of 159,138 international students pursuing studies at higher education institutions in Malaysia. This figure represents 12.6 per cent of the overall 1,264,541 student enrolments in this country. Of this figure, there were 56,565 international students, or 8.9 per cent of the total students at public universities, while 102,573 international students study at private universities and colleges, which is 16.3 per cent of the total 629,835 students in the private sector. I would like to raise two issues concerning the study of foreign students in Malaysia. One is that we should be proud that more and more students from foreign countries are studying at universities and colleges in Malaysia. But the ministry must also examine the problems and academic standards of these foreign students. I understand that some of these foreign students do not understand English or Malay and are directly recruited into our public universities.
Some of them indeed do not understand lectures at the university and their academic achievement is indeed unsatisfactory. My question is— do our public universities compromise on academic standards and continue to offer degrees to these foreign students who pay fees but are substandard? Second, I have heard the lamentations of private higher education institution operators who find it very difficult to communicate with KPT officers who handle applications for college establishment and course offerings. Although the KPT customer charter is to respond to any form of application within 45 days, in reality, private college operators often have to wait for several years to receive a response to their applications from KPT officers. Usually, when private university or college operators follow up on their applications, they are either told that their application file is lost or that the officer in that division has been transferred to another division. I hope the Honourable Minister can strengthen the private higher education institutions division and establish an appeals channel for applicants of private higher education institutions or foreign students who wish to lodge complaints about their problems. Madam Chairman, in this Budget 2027 book, I could not find any details of allocation for the private higher education institutions affairs division. Does this show that there is no such division in KPT? Finally, Mr Chairman, I welcome the government's stance to give university students greater freedom to hold their programmes and, indeed, to repeal the AUKU eventually. Here I would like to suggest to the Honourable Minister that the Student Affairs Division (HEP) of public universities give university students greater freedom now to hold activities and even to open bank accounts for their associations. We often receive emails from public university student associations asking us to donate to them to organise activities. Usually, the bank accounts they provide are either in the name of individual students or they borrow a local association as a body to apply for financial assistance from Members of Parliament. I feel this is an unhealthy situation. They say that if our money or Members of Parliament's allocation is deposited into the account
of the public university HEP, it is very difficult for them to withdraw funds from the public university HEP. So, I feel this is something the government can take steps to correct before this House amends the AUKU. That is all, thank you.
Thank you, Honourable Member. I invite the Honourable Member for Kangar to speak.
Assalamualaikum warahmatullahi wabarakatuh, good afternoon. So, Kangar takes this opportunity to debate the committee stage for the Ministry of Higher Education (KPT). I go to Item 05015 – ICT Strategic Planning. So, the federal expenditure estimate is RM81.3 million in 2026 to RM83.1 million in 2027. There is a slight increase. We are in the era of the Industrial Revolution 4.0, artificial intelligence, digitalisation and a data-driven economy. And universities must no longer be places that deliver knowledge conventionally but must become centres for technological development and digital innovation. However, with the current situation in which cyber attacks are occurring all over the world, universities too are exposed to attacks. So, to what extent does KPT ensure that all IPT have robust cyber security systems? This is because universities hold various sensitive information, including students' personal information, academic records, research, finances and so on. Next, regarding AI. Is this allocation being used to develop AI infrastructure, public computing, data centres and smart learning systems? And how does KPT ensure that public universities across the country have fair access to AI technology, not just the leading research universities? I also want to draw the attention of the Honourable Minister to the fact that UniMAP or Universiti Malaysia Perlis should also receive digital facilities, smart laboratories, simulation equipment and network infrastructure comparable to the other public universities. I go to Item 05018 – Upgrading of Facilities in IPT. I welcome the increase in allocation to RM91 million in 2027. However, we still hear complaints about dilapidated residential colleges and toilets that are not
properly maintained. So, does KPT have a comprehensive audit of the condition of buildings, electrical wiring systems, piping systems and other basic facilities?
How many residential colleges have been categorised as critical and in need of immediate repair? I touch on Perlis. Is the UniMAP residential college at Wang Ulu, Bintong, Perlis also included in these items? Mr Chairman, I move on to graduate employability. More than one-third of highly educated workers in this country are trapped in jobs below their qualification level. This has been discussed often, and if we look back at the data from DOSM, there has been a decline: graduate unemployment fell from 3.4 per cent to 3.2 per cent in 2024. However, the real reality is that 1.6 million graduates experience underemployment in relation to their skills. They consist of graduates who work at semi-skilled or low-skilled levels. I want to ask the Honourable Minister, what are the government's proactive actions? I think the Minister has already done many things, and the universities have also done many things, but the problem has not yet been resolved. We do not know when this problem will be solved. Perhaps in the next 10 years this problem will continue to drag on. And what are the government's proactive actions? Is it by increasing job opportunities, which is the government's responsibility, or by increasing graduates' skills in various fields. So, these students will acquire various skills, perhaps in – skills or soft skills, and they will be able to improve themselves to be ready for the outside world. Mr Chairman, I will go to the last one. Item 05011 – Fundamental Research. This has not been mentioned again. In my view, this is one of the most strategic allocations in the development of the country's higher education. Fundamental research is not merely about producing theses, journals or academic engagement. It is the foundation for discovering new knowledge, developing technology, solving societal problems, and creating innovation that can provide economic returns to the country. However, I am rather confused that the allocation for this item has been reduced to RM57.5 million in 2027 compared with RM107.6 million in 2026
that is a reduction of nearly 47 per cent. So, I request the Honourable Minister to provide an explanation. And next, I want to touch on research funding for young lecturers and researchers. We have many young lecturer-researchers. Nowadays, lecturers are very young. Not only are they young, they also have good ideas and expertise, and they have great spirit. Does KPT have any assurance that this reduction in allocation will not affect young researchers and university lecturers? Does the ministry have any special scheme or fund for young researchers, including researchers who are just beginning their academic careers? I think that is all for today. Thank you.
Thank you, Honourable Member. The last debater is invited, the Honourable Member for Pulai.
Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, greetings of MADANI. Thank you, Mr Chairman, for giving Pulai the opportunity to debate the committee stage under the Ministry of Higher Education. Firstly, Pulai wishes to refer to Item 30900 – Universiti Malaysia Sabah Hospital (HUMS). During the visit of the Malaysian Parliamentary Select Committee on Health, we discussed with the Ministry of Health (KKM) in Sabah, looking at the problem of a shortage of doctors in the state of Sabah. One of our proposals in that discussion was to produce more doctors who come from Sabah, as well as from Sarawak. So, with more medical graduates produced from this state, they will be seen to be more loyal in carrying out activities in that state. So, my question to the Minister is this. What efforts are being made to increase the number of medical graduates in Sabah and Sarawak within the framework of increasing the budget and so on? What efforts have been carried out to ensure that these medical graduates are sufficient for the needs in Sabah and also in the state of Sarawak? Next, Pulai wishes to refer to Item 05018 – Upgrading of Facilities in Higher Education Institutions. This increase is a positive development. However,
I want to see this allocation not merely as expenditure to repair buildings but as an investment in the capacity and competitiveness of the nation's higher education institutions. We must acknowledge that university infrastructure has a direct link with the quality of education and research. Inadequate laboratory facilities will limit research capacity. Learning facilities that are no longer suitable will undermine the effectiveness of teaching, while buildings and facilities that are not properly maintained may increase university operating costs in the long term. In this context, the question is not merely how much allocation is added but what development priorities are to be achieved through the additional RM49.4 million? Pulai wishes to raise three points to the ministry. Firstly, what is the ministry's approach in determining the priorities for facility upgrading projects? Does the ministry give priority to high-technology research laboratory infrastructure, teaching facilities and repairs to existing buildings? Pulai is of the view that distribution should be made based on strategic needs and the level of infrastructure readiness of each university. Secondly, does the ministry have a comprehensive assessment of the infrastructure gap between public universities? We must ensure that universities that are developing and strategic research fields do not fall behind merely because of facility constraints. At the same time, universities that have old buildings and facilities need to be given attention so that they do not continue to bear increasing maintenance costs. Thirdly, what is the ministry's target for the outcomes of this investment? How many facilities will be upgraded? How many research laboratories will be improved, and to what extent will this project be able to increase the capacity and productivity of higher education institutions? Pulai proposes that the ministry prepare a phased development and upgrading plan for IPT infrastructure based on an audit of facilities, the needs of fields of study and the nation's education priorities. The implementation of projects must also be accompanied by clear performance indicators so that every increase in allocation can be measured based on institutional impact.
We do not want university development to focus only on academic achievement and rankings in international league tables, while the infrastructure that forms the basis of that excellence is not given due attention. Secondly, Pulai wishes to refer to 05012 – University Scholarships and Research Training. In a situation where the cost of studies, the cost of research and the cost of living are increasing, this very small increase raises the question of whether existing funding is sufficient to meet the needs of postgraduate students and young researchers. We cannot expect universities to produce more world-class researchers if students who wish to pursue master's and PhD studies face difficulty in obtaining scholarships and research funding. How many scholarship recipients and research students are expected to benefit from the RM203 million allocation? Does the Ministry plan to increase the number of scholarships in strategic fields of the nation? How does the ministry ensure that the rate of research assistance allowance remains relevant to the increase in the cost of living? Pulai proposes that the ministry prepare a long-term funding plan for postgraduate students, particularly in strategic research fields, and expand funding opportunities to talent from diverse socioeconomic backgrounds. Thank you, Mr Chairman.
Thank you, Honourable Member. The Minister is now invited to respond, for 30 minutes. The Honourable Minister may answer the issues raised by Honourable Members who are present in this House. As for issues raised by Honourable Members who are not present in this House, the Honourable Minister may respond in writing.
Thank you, Mr Speaker. Firstly, I thank and express appreciation to all Honourable Members who have taken
part in the debate on the Supply Bill 2027 covering various matters under this ministry. This shows the concern of all Honourable Members to see the Ministry of Higher Education continue to move forward with various programmes to further enhance the quality of the nation's higher education. I want to continue answering several matters raised; if there is not an opportunity for me to answer all of them, then the factual answers will be followed up with written answers to all Honourable Members. There are several main issues raised by all Honourable Members concerning student welfare, the status of the AUKU, fee exemptions, research funding and also IPT in Sabah, governance of private universities, the specific collaborative programmes referred to earlier, and graduate employability. In brief, let me take this limited opportunity to answer several important matters raised by all Honourable Members. Among those that caught my attention is the matter raised by Kangar earlier regarding security threats, and the cyber security related to it, which has become the headline, a major topic at this time involving all agencies and ministries. Therefore, at the ministry level we have also taken firm approaches together with NACSA in particular and also the National Security Council, so that we can face this problem together. Alright, regarding the issue raised by the Honourable Member on student welfare, this includes the matter of hostels, accommodation, and also the position of students, student leaders, who were conveyed and specifically mentioned by Jelutong earlier on behalf of a particular student. And I want to state here that in terms of student welfare as a whole, we always give attention, and this also involves the provision of scholarships to undergraduates and financial assistance to eligible students, with assistance for students who— and we must not forget, when we discuss higher education, it also includes polytechnics and community colleges. Therefore, we take an approach to solving the problems of all students in these three important institutions. Thus, we have
implemented programmes such as scholarship assistance and financial assistance for students at community colleges, and also including foundation financial assistance and the B40 Dermasiswa for those following TVET courses, High TVET. And for the information of the House, according to KPT data, in this year alone, for the period up to 15 October 2026 for this year, a total of 26,934 B40 students have received sponsorship from KPT, and for early higher education assistance, including through Yayasan Perkasa Siswa, we continue to help them, and so far a total of RM439,000 has been channelled to those who are most in need, as raised by Honourable Members earlier. There are students in difficult circumstances whom we go and find so that they can enter the relevant institutions. This includes in Sabah, in Sarawak and also in the Peninsula. And we have a programme that we call the first-child programme, where in a family with a first child entering university, we provide free tuition to them, meaning they do not need to pay tuition fees, and this applies across the board, not just to one race but to everyone involved. For— as we know, for the allocation to upgrade and refurbish hostels and accommodation, which I saw earlier many Honourable Members also raised this issue. We are using several approaches or models on how we want to expedite one of them with the refurbishment allocation provided as stated in the allocation for 2027. But at the same time, we are also using the approach that was debated earlier by Sabak Bernam, Sabak Bernam earlier— Tanjong Karang I think, who raised an issue relating to...
Sabak Bernam.
Sabak Bernam, Minister.
Sabak Bernam, I saw Sabak Bernam earlier. And raising the issue in terms of assistance or from KWAP, which uses, another model, actually it is not the only model we use, there are various models used, including through private initiative or through PPP or PFI which we often
use. And also at the university level, there are universities whose financial capacity allows them to expedite that construction. So many places have been provided, and during the RMK13 period, five new residential colleges at public universities have already been obtained through the PPP method with a total accommodation capacity of up to 21,000 students. We will continue with projects like these because these are among the essential needs of our students. And for the Honourable Member's information, there are other issues raised, including the AUKU as an example. As we know, we have debated the AUKU for tabling this time, and we will amend some provisions to make more comprehensive preparations to amend the existing AUKU. Therefore, for this time we have placed emphasis on matters that are still obstacles for students in carrying out their programmes. But I want to say— I want to answer, as raised by Raub earlier, several matters relating to Raub, with freedom having already been given, as we know. As an example, also raised by Seputeh, for them to open an account, they no longer need to use the accounts of those associations, other associations. Now, they can— with permission, they can open their own account with permission and they can, and that means anyone who wishes to give assistance or donations can go directly to their account. So, some of them may take a little time to open that account. But in principle, there is no longer any obstacle for any association, especially student associations, to open their own accounts. So, from now on they can do so, and likewise in terms of the constraints mentioned by Honourable Member Raub earlier, as perhaps the Honourable Member was not present when the Right Honourable Prime Minister attended FIIM, and the following day we made a decision that there are no longer any obstacles. All disciplinary matters and so on have been withdrawn, and this includes also in the AUKU Act that we will implement later. So, this is a matter relating to the AUKU, and I answer briefly here, yes.
Next, the issue relating to Jelutong, the matter, an interesting question raised by him, namely about the question of values in our higher education system, and we, in the context of education, the Ministry of Education, that is the emphasis we place in our new education policy, namely 2026–2035, by emphasising the humanity-centric aspect, with permission, that is, humanitarian aspects. The Right Honourable Prime Minister also discussed the matter of "Reaching for the Sky, Rooted to the Ground". Being rooted to the ground is precisely what is based on moral matters and matters of values.
Whichever way we look at that matter, in our context we too need to educate ourselves together. And when we refer to any particular case that we consider popular, we should likewise play a role in educating our society, our student children and so on, so that they always remain in a state that is factual, civilised and also responsible, because we want to produce good people with these good values. That is precisely why we always open this space to our students so that they can always be with us. As mentioned, the name mentioned earlier is actually a programme organised by the higher education institution (IPT) itself, by the ministry itself. I was there, and I am the one responsible for organising a programme to build leadership among our undergraduates, male and female. Give them space to express their views and their good arguments, but at the same time it must be based on the process of education in the context of leadership, which must also be carried out within a context that has facts, has responsibility, and at the same time operates within a system of manners. So, we hope we will be able to produce many more student leaders, not just the one referred to earlier, but many more based on the three criteria I mentioned earlier. Next, regarding the matter of research funds. This is— I am aware that in terms of the allocation available for fundamental research, it has decreased this time. The reason, for the information of the Honourable Members, is that there are several allocations previously given that are still running, totalling more than RM200 million, which require the continuation of the programmes that were organised.
But at the same time, I would also like to mention here that we will continue our efforts to increase that amount further. That is precisely why the ministry has been asked to implement projects such as these together, research such as this, with the relevant ministries. For example, the Ministry of Science, Technology and Innovation (MOSTI). And the views raised by the Honourable Member earlier are also related to how this research can be commercialised. I would like to announce, and I have already announced in this House, that we have begun what we call URIS, namely university research with industry, and we have brought together the industry players outside and the universities so that they can look together at research aspects that can generate commercial value. This was held recently and attended by several thousand researchers as well as industry players in our country and also from the international level. On the matter raised by the Honourable Member regarding laboratories needing to be improved and so on, with the provision of new laboratories, I understand, and that is indeed very much needed because what we say in the research world must have, with permission, horizon scanning, by looking ahead to which new fields we need to develop. And in this context it is also related to what was raised by Kepong earlier, regarding emerging fields that require focus from us so that we can ensure universities can continue to grow with the new programmes they offer. Then, also— some of the Honourable Members raised issues relating to Sabah. Thank you also for raising the issue of Sabah's and Sarawak's needs, especially in certain fields such as law and medicine, and that is what we give priority to. For example, perhaps the Honourable Member for Penampang knows that previously we discussed in Cabinet the need to add more in the field of law, and we give priority, indeed a special privilege, to allow UMS to run law programmes, and this includes Universiti Malaysia Sarawak, because that field has specialised areas
related to local law, for example Adat law and others. So, that matter has already begun, for the information of the Honourable Member; it is no longer just a plan. I have checked recently and this programme has already been developed. Perhaps, if I am not mistaken, the intake this time or the next one will begin. Then, the other matter relates to medical programmes. We give priority to that as well. The majority are actually students from Sabah and Sarawak. In the context of UMS, more are from Sabah. Likewise at UNIMAS, more are from Sarawak students. So, we give this priority so that we can produce more medical officers or doctors who originally come from there and can serve back in their own states. Other matters, including issues raised regarding UiTM and also INTEKMA. Those are steps we have already taken, and God willing, we will not let them be. INTEKMA will transfer ownership to others, and we will develop it more creatively. Apart from that, the issue raised also relates to UiTM in Tawau. That is actually a rationalisation plan, but it does not close the door. Because we see, for the information of the Honourable Members, that the programme in Tawau has students only until 30 September, if I am not mistaken, only 254 people studying only at the pre-diploma level. Yet we have a UiTM that can offer diploma and degree programmes, but here there are only 254 students who are only continuing their studies at the pre-diploma level before entering the diploma level. Therefore, more constructive steps are what we propose on how to continue, but at the same time how we can make the area concerned an education hub. Perhaps there are other institutions that can help as feeders to the existing institution. So, I hope I have explained in this House the issues raised. I know the issue in Sabah, the issue relating to UiTM in Sabah, has become one of the rather heated issues in the state of Sabah at this time. So, I hope with this explanation the temperature there can be eased a little. Thank you.
As for the other matter, Honourable Member, the matter raised by the Honourable Member for Pasir Gudang is very specific. Thank you for raising a question so well, one, one, one, one, he asked. And I will also prepare in detail for the Honourable Member. It may be used as a reference. But in terms of the Act, the Act relating to Private Higher Education Institutions (IPTS) is subject to the Act called Act 555, three times 5. And up to now we have 300 the latest. We have actually reduced them, for the information of the Honourable Member, because when I came in I found there were far too many. So, we asked to review the position of these private universities, and up to now we have been able to reduce them, because for those that no longer function, we close them. We have directed them to close the institution, and up to now we have 359 in total, covering 65 universities. And the rest are of college or university college status. And there are 11 overseas branch campuses, 39 university colleges and 244 colleges registered under this Act 555. And in terms of the overall students at the 65 IPTS of university status, with local student numbers, we have 348,496 people, while international students number 75,721, and this is up to 30 September.
As for, I think I answered briefly, the rest I will provide this information back to the Honourable Member. And as for the matter relating to INTEKMA, I have answered briefly earlier. Regarding the matter of repayment exemption, we will also refer it back to the— this is a matter of policy decision, for the information of the Honourable Member. We can recommend to the government regarding PTPTN repayment for excellent students from the IPTS mentioned.
[Bangun]
So the Honourable Member may write to the Right Honourable Prime Minister. Regarding Kapar. I understand Kapar; because the Kapar question is specific, which we— I will request from the ministry, and there are some things Kapar raised earlier that are not under the Ministry of Higher Education (KPT) division, for example TVET. TVET programmes depend on which TVET is being referred to; this can be referred to the National TVET Council (Majlis TVET Negara).
Industrial training, that's agreed, right?
Ya, setuju.
Okay, thank you.
What that means is, that is actually...
Need to do a bit more.
That is actually part of the process, because they must undergo industrial training in various fields, especially in engineering and technical fields related to the technical sector.
But Minister, why did the Minister say TVET is not under the— under the division, because it is under this budget?
No, what I mean is that it is under the National TVET Council (Majlis TVET Negara). If the YB looks again at the National TVET Council, and also in the context of higher education, we focus on Higher TVET, as it is called. High-TVET is in the polytechnics and also in the relevant Malaysian Technical University Network (MTUN).
That is among what I asked for earlier, the polytechnics. Agreed, Minister, yes.
There is no problem relating to the interests of the people, the ones who were talking about the blue wave earlier, right. Regarding the Honourable Member for Seputeh. This Honourable Member for Seputeh stands at Stanford. I also have this information; I think later we— I will prepare it for the Honourable Member, there is no need for me to deliberate further because I have this answer. I will ask the ministry team to prepare this answer for the Honourable Member's reference. Graduate employability, for information, based on our Graduate Tracer Study System, we have a system we call SKPG, namely the KPT's system. The number of new Malaysian citizen graduates who were employed in 2025 is 217,768, which is equivalent to 92.3 per cent, while those who are not yet employed number 18,279 graduates, 7.74 per cent, with permission. Earlier Arau raised his concern, but this is the figure in our SKPG system. So, if Arau has other figures, perhaps he can compare with us. So, I think Honourable Dato' Yang di-Pertua, the other matters we will explain in detail later. For this ministry, I once again thank the Honourable Members for the matters raised...
Minister, the PTPTN issue? Earlier I raised the PTPTN issue by IPTS students.
I did answer earlier; perhaps the Honourable Member did not hear, I think. I said— I did answer earlier that it relates to policy. The Honourable Member may bring it directly to the government. I mentioned earlier, perhaps you missed my point earlier.
But it is indeed a truly serious issue. Thank you.
It can be recommended. I think this is not the first time we have discussed it in this House. Previously we also discussed the position of those who obtained first class; there was such a thing before. Then the government made a decision due to, firstly, financial constraints. Secondly, in terms of system coordination or the position of distribution, in terms of how we assess first class and so on. That too, I think, can be recommended back to the government, and if they are also in the B40 category, as the example raised. For us, I have never said no, so the Honourable Member may submit it as a policy paper to the government subsequently. So I thank you again for all the debates put forward and also the views and suggestions put forward by all Honourable Members. Thank you.
Thank you, Honourable Minister. Accordingly, the question is that the sum of RM15,129,293,500 for Head B.64 of the 2027 Operating Expenditure Estimates forming part of the Schedule be agreed to. [Question put and agreed to] [Head B.64 ordered to form part of the Schedule]
The question is that the expenditure stated under Head P.64 in the 2027 Development Expenditure Estimates be approved. [Question put and agreed to] [Head P.64 forms part of the Estimates of Expenditure] [The Council of the Meeting resumed sitting] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) chaired the Meeting]
Honourable Members, the sitting of the House today is adjourned until 10.00 a.m. on Thursday, 12 November 2026. [Strikes gavel]
[The House adjourned at 6.18 p.m.]