Dewan Rakyat · 16 November 2026

15th Parliament, session 5, meeting 3 · not final · 844 turns · 52,543 words · official PDF ↗ · Digital Hansard ↗

681 of 844 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

(Opening)

[Deputy Speaker (Puan Alice Lau Kiong Yieng)

(Opening)

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, with great sorrow and grief, I wish to announce to all Honourable Members that Datuk Zahidi bin Zainul Abidin, former Member of Parliament for Padang Besar, passed away on Friday, 13 November 2026. On behalf of the Members of this House and of Parliament as a whole, I wish to extend condolences to all the family members of the late Datuk Zahidi bin Zainul Abidin. I hope that all his family members will remain steadfast in facing this situation.

Oral QuestionsQuestions

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Dato' Seri Hishammuddin bin Tun Hussein, Sembrong.

Thank you, Mr Speaker. Sembrong Question No. 1.

Hishammuddin bin HusseinUMNO · BNSembrong · questionEN

1. Dato' Seri Hishammuddin bin Tun Hussein [Sembrong] asks the Minister of Investment, Trade and Industry (MITI) to state the ministry's plans to expand electric vehicle (EV) charging station infrastructure to rural areas and small towns in order to stimulate the adoption of green technology.

Tuan Sim Tze TzinPKR · PHDeputy Minister of Investment, Trade and Industry · Bayan BaruEN

Thank you, Madam Speaker. Thank you to the Honourable Member for Sembrong for asking this interesting question.

Tuan Sim Tze TzinPKR · PHDeputy Minister of Investment, Trade and Industry · Bayan BaruEN

The Government remains committed to expanding the development of EV charging infrastructure throughout the country, including to rural areas and small towns, to ensure that EV charging facilities are accessible to the public more comprehensively. This effort is carried out— in line with the National Automotive Policy (NAP) 2020 and the New Industrial Master Plan 2030, namely NIMP 2030. As of 30 September 2026, a total of 7,341 public EV charging units have been installed throughout the country. These consist of— among them 4,992 alternating current (AC) chargers and 2,349 direct current fast chargers. The Government always gives attention to the aspects of distribution and accessibility of this infrastructure, to ensure that the development of EV charging facilities is not only concentrated in major urban areas, but is also extended to small towns and rural areas based on local needs. The development of EV facilities— EV charging in Malaysia is driven mainly by private sector investors through charge point operators (CPOs), which take into account commercial viability, covering the level of consumer demand, installation costs and the readiness of electricity supply at a location. Honourable Member, to ensure that this expansion is implemented in a planned manner, the Government targets the development of 30,000 EV charging points throughout the country by 2030, which is roughly four times the current number. This target will be realised through encouraging private sector investment through CPOs as well as cooperation with state governments, local authorities (PBT) and industry players. For the information of the Honourable Member and also Madam Speaker, to support this expansion effort, the Government has strengthened a whole-of-government approach through cooperation between ministries, agencies, utility companies, state governments, PBT and industry players. Among the initiatives that have been proposed are as follows: (i) standardisation of the approval process through the implementation of the Garis Panduan Perancangan Petak Pengecas EV or GPP EVCB by PLANMalaysia, which took effect on 15 August 2025. This guideline standardises the application process at all PBT throughout Malaysia, Peninsular Malaysia and

Tuan Sim Tze TzinPKR · PHDeputy Minister of Investment, Trade and Industry · Bayan BaruEN

the Federal Territory of Labuan, and sets a processing period of up to 14 working days for complete applications. Thus, for new developments of all strata, they must have EV charging points; (ii) strengthening cross-agency coordination through cooperation between the Energy Commission (ST), Tenaga Nasional Berhad (TNB), PBT and CPOs to facilitate site access, readiness of electricity supply connections, and resolution of issues in implementing EV charging infrastructure development projects; and (iii) monitoring and coordination at the national level through the National EV Task Force meeting chaired by MITI, as well as the National EV Steering Committee meeting chaired by the Honourable Deputy Prime Minister cum Minister of Energy Transition and Water Transformation, to ensure that cross-ministry and cross-agency issues are addressed in an integrated manner. That is all, thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Sembrong.

Thank you, Speaker, thank you, Honourable Member. My supplementary question is simple. Actually, I welcome the additional 4X expansion target, namely 30,000 units by 2030. However, I see that today, with global oil prices soaring, with EV technology improving and also EV costs falling and becoming reasonable, I observe that the reception and adoption of EVs will become wider in the near future.

So, my basic question earlier was related to the gap between cities, major highways and areas that are outside the cities and remote. And I hope that range anxiety, with permission, can be addressed between these locations, and that the people will not be burdened with the high cost of installing home chargers.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan soalan.

Last. My question is, the Honourable Member just now mentioned the approach of private companies. Whether the Government can impose conditions on these companies to be obligated to install local EVs in the areas I mentioned earlier, especially those receiving Government incentives. And secondly, the Honourable Member mentioned the whole-of-government approach, whether we have considered local authorities (PBT) to accelerate the network of public chargers in small towns. Thank you.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you, Honourable Member for Sembrong. To address the range anxiety issue, yes, the Government has— so far there are already 148 units of EV charging stations (direct current) that have begun operating at R&R, lay-bys and petrol stations on major highways such as PLUS, WCE and LPT. These are long highways, which they need in order to resolve the range anxiety issue. So far, there are already 20 CPO companies that have been active in installing EV charging stations, and actually we encourage them to— they are chicken and egg. If there are many EV cars, then of course they will push towards adoption. With high adoption, of course more CPOs will actively engage in installing EV charging stations. So far we do not yet have a mandate requiring them to install them here and so on. At this point, we encourage it, because it has many issues. Actually, the issue is— for example, we need substations. Substations are provided by TNB. It has— very— these substations are expensive and TNB needs to plan. It cannot say today that it wants a substation, and tomorrow it already exists. It needs construction, planning and so on. So, in certain areas it needs substations. It has to plan, for example, outside rural areas and so on. It needs planning to ensure sufficient electricity for the substation, build the substation, and only then can CPOs tap into the substation and sell to the public. So, everything has certain costs. Substations are not cheap, and is there enough users to cover that cost? All of these exist...

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan jawapan.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

...The planning that we need to carry out must be done more carefully, yes. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Kubang Pasu.

Thank you, Madam Speaker. Thank you. I have asked about this EV matter many times, and the person who answers is also the Deputy Minister, my long-time friend. The Government targeted the installation of 10,000 public EV charging units nationwide by 2025, but it was not achieved. At that time, we only got 5,624, but as mentioned by the Deputy Minister, we have managed to increase it to 7,200. This is good progress. Based on the charging rate achieved up to September 2026, perhaps in 2026 we can achieve up to 10,000 units. Madam Speaker, as of October 2026, a total of 141,738 EVs, nine percent of total TIV, have been sold and registered by the Road Transport Department (JPJ). A sharp increase in 2025, namely 44,413 units, compared with the 3,127 when we first started.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, your question.

For 2026, from January to September, it reached 53,000 units. The question, Madam Speaker— since you have asked about that, I must ask the question directly, yes. What is the Government's concrete plan, including the EV levy and cooperation with TNB on substations— which was mentioned by this Deputy Minister— these problems and so on, to achieve 30,000 chargers by 2030, and not only that number, but more importantly, it is sufficient to meet the needs of the number of EVs on the road, taking into account rural areas and small towns. And furthermore, what is the basis used in determining the 30,000 chargers by 2030? Is it based on a certain ratio between the number of chargers and the number of EVs on the road? Including at present, where the ratio is one charger to 20 EVs. That is all, thank you, Madam Speaker.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

Thank you to my friend, the Honourable Member for Kubang Pasu, who asked a good question and also has the facts, yes. This is good. Actually, we are working on it, yes, in various ways to increase it, and we have already been very successful so far. I think it is from earlier, 2020, when there were only just over 300 EV cars, now it has reached hundreds of thousands. So, this shows that tens of thousands of EV cars and of course they need EV charging stations. So far there are already 7,341 public EV charging stations. So, this is very large.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

So, I think we already have a very competitive and necessary ecosystem, of course it needs to be further improved and our target is 30,000. To increase EV charging stations, there are various ways. Perhaps some have raised the matter of levies and so on, we will study it. So far it is at the study stage, we cannot implement it hastily because it involves other issues. For example, as I said earlier, TNB needs to help in planning more substations. If substations are not resolved, it cannot expand. So, we hope TNB will help the Government to provide more EV charging stations and ultimately in terms of benefits to cost. We know that now if we charge EVs at home, yes, at home. It actually saves users about 30 percent, you know, compared with BUDI95. BUDI95 already the lowest in the world, yes, in terms of fuel prices we are the lowest in the world. But if we charge using EVs, charging at home, the cost can actually save even more. According to the CPOs who informed us, it is about 30 percent saving, yes. So, I think there is a business case. If there is a business case, if we expand more adoption of EVs, then CPOs will have much business, the price of CPO charging outside will fall. It will fall. So, in that respect, we will expand. So, for now, we are pushing very hard.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan jawapan.

Tuan Sim Tze TzinPKR · PHBayan BaruEN

We will try all kinds of approaches to expand EV charging stations. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Thank you. Honourable Members, I wish to remind you that each question is allotted six minutes only, but Question One has already taken 15 minutes. So, I hope Honourable Members, whether those asking or answering, will please summarise the questions and answers. I invite Kapten Dato' Dr. Zulkafperi bin Hanapi, Tanjong Karang.

Thank you, Mr Speaker. Tanjong Karang Question No. 2. Thank you.

Zulkafperi bin HanapiBERSATU · PNTanjong Karang · questionEN

2. Kapten Dato' Dr. Zulkafperi bin Hanapi (B) [Tanjong Karang] asks the Minister of Health to state when the Government will introduce a sustainable national health financing framework to reduce the dependence of the public health system on annual allocations and to address the rising cost of treatment.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Please, Honourable Minister of Kuala Selangor.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHMinister of Health · Kuala SelangorEN

Thank you, Madam Deputy Speaker. Thank you to my friend, my neighbour, Tanjong Karang. Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera, Malaysia MADANI greetings. Deputy Speaker, as I have announced and stated several times, and in line with RMK13, the Ministry of Health Malaysia (KKM) is implementing a transformation of the health financing structure through the establishment of the National Health Fund (DKN).

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHMinister of Health · Kuala SelangorEN

The DKN was actually brought up by me since my first term steering the KKM, in the document Sihat Bersama 2030, and subsequently, it was elaborated in the Health White Paper approved in this House in 2023, Madam Speaker. For the information of the Honourable Member, health financing systems can be divided into two. I will mention their names. The Beveridge model, or simply, one based on government taxation as in Malaysia and also the UK. And another model that is based on, rests on, the involvement of mandatory contributions from formal workers or social insurance contributions, with workers and employers contributing. This is said to be the Bismarck model, yes. The Bismarck model or insurance scheme as in Germany. The DKN that we are drafting will retain the strength of the first model, the model that is called, with permission, tax or tax base or general taxation, meaning taxes, the Beveridge model. Financing through general taxation that guarantees comprehensive coverage to all citizens, while also taking the strength of the second model, the Bismarck model, yes. The insurance-based model, namely a specific health fund managed separately, is what is meant by the second model. So, we are adopting a sustainable national financing framework that is tailored to the Malaysian context, which may be one that is hybrid in nature.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHMinister of Health · Kuala SelangorEN

So, the establishment of the DKN represents a major structural change. It involves the drafting of new legislation, Federal–state relations, and may also touch on matters related to the Constitution. Therefore, it must be implemented carefully, thoroughly and prudently. Deputy Speaker, at this time the KKM is starting work to study the financing aspects. For example, the modelling or actuarial modelling, the projections, its benefit package, its governance and the legal basis of the DKN itself, in line with the Malaysian context and international best practice. This effort also involves policy coordination across what is termed whole-of-government, so that we can draft a comprehensive and realistic DKN. The KKM targets the drafting of the National Health Fund Act by 2029, Honourable Member for Tanjong Karang. This is what we hope will achieve what is termed universal health coverage. This is where the funding will also continue to achieve universal health coverage for the whole country, yes. As for me, if I shift a little to...

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Reform of the private sector, it is the reset program. That is a little that I can mention first. Thank you, Deputy Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Tanjong Karang.

Kapten Dato' Dr. Zulkafperi bin Hanapi (B)BERSATU · PNTanjong KarangEN

Thank you, Mr Speaker and the Honourable Minister of Health. Measures such as outsourcing to private hospitals, the implementation of the DRG system and the MediAsas insurance scheme are only short-term cost control mechanisms. They are not a structural solution to the ministry's budget constraints. Is the Government not concerned that the KKM's approach, without a firm date for establishing this national health financing fund, will cause public hospitals to remain burdened with annual allocation deficits and patient congestion for many years to come? I seek an explanation. Thank you.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Deputy Speaker, I am very aware of what the Honourable Member for Tanjong Karang has said. Even though, if we want to address current challenges, firefighting that I face every day

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

namely overburdened hospitals, long waiting times— not long waiting times, especially for elective procedures. All of that requires me to solve that problem. First, something that is short-term compared with what I want to build as a long-term plan, namely the national health fund. So, we need to understand what burdens our facilities and also what the people demand, patient experience, with permission, the patient experience in our facilities. That is why we consider outsourcing important, Deputy Speaker, because if we look at how waiting time for any procedure, whether cardiology or nephrology, all of these today, people have been able to reduce waiting times of months, yes. And also from one aspect, those facilities, Mr Speaker, cannot be built in the near future. To build an ICL, for example, to build cardiothoracic, to build whatever is in the 14, what we call the HSOP or Hospital Services Outsourcing Programme, is in my view very appropriate to current demands. As for the long term, we certainly want to build this national health policy or fund. So, do not misunderstand, yes. So, those two matters are something that must be observed carefully. It is fine for friends, from the opposition, to say this. But we, if we sit on this chair, the ministerial chairs, with permission, we will know how to address short-term demands and constraints, compared with what we want to achieve in improving the system and service delivery in the medium and long term. So, at the end of the day, Deputy Speaker, we want to modernise and improve the performance of delivery or health services in all public health facilities in particular. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Dato' Ngeh Koo Ham, Beruas.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Thank you, Deputy Speaker. Trump won in Malaysia, many shouted and cheered; my question is number three.

Ngeh Koo HamDAP · PHBeruas · questionEN

3. Dato' Ngeh Koo Ham [Beruas] asks the Minister of Home Affairs to state why illegal cryptocurrency mining in Manjung District, Perak, is rampant. State why these illegal mining operators are difficult to arrest and bring to court.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Please, the Honourable Deputy Minister of Home Affairs.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Thank you, Mr Speaker. Honourable Member for Beruas, I already answered this question last July. Illegal cryptocurrency mining such as bitcoin is among the matters given serious attention by the government because such activities usually involve unauthorised use of electricity supply, tampering with meters or unauthorised electrical wiring, which can cause losses to utility companies and increase the risk of fire and the safety of the public. In Manjung District, Honourable Member, Perak, integrated enforcement actions between the Royal Malaysia Police (PDRM) and Tenaga Nasional Berhad have been carried out continuously to eradicate these activities. Related offences can be acted upon under section 37 of the Electricity Supply Act 1990. Meanwhile, acts involving breach of trust may be investigated under section 427 of the Kanun Keseksaan. For the period 2024 to August 2026, a total of 265 raids have been carried out in Manjung District, with 43 arrests made and 26 individuals already charged in court. Among the main challenges in eradicating illegal cryptocurrency mining activities is the complexity of identifying the true owners, operators and parties who benefit from such activities. These activities usually use crypto wallets or cryptocurrency platforms that operate overseas, including through the provision of services centred outside Malaysia's jurisdiction. In this regard, Honourable Member, the PDRM, together with related agencies including CyberSecurity Malaysia, carries out intelligence gathering and analysis of transactions and financial flows to identify the parties involved. However, if the owners of these crypto wallets, the platform operators or the electricity supply providers are overseas, the process of obtaining ownership information, transaction records and the required digital evidence becomes more complex and depends on cooperation and legal mechanisms at the international level.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Furthermore, Honourable Member, these activities are also hidden behind rented premises and utility accounts of third parties to obscure the authorities and make it difficult to trace the individuals who actually control and operate the operations. In some situations, Honourable Member, the owner of the premises, the holder of the electricity account and the individual operating the mining machines are different parties. Therefore, the presence of mining machines at a premises does not necessarily directly link the owner of the premises or the individual present at the location as the party responsible for the activity. In terms of proof, investigations must identify the relationship between the suspect and the premises, electricity supply, mining and finances, as well as the proceeds of the cryptocurrency obtained.

Datuk Seri Dr. Shamsul Anuar bin Haji NasarahUMNO · BNDeputy Minister of Home Affairs · LenggongEN

Therefore, in conclusion, action against some of the parties involved before the courts requires sufficient and strong evidence, including technical, forensic and digital evidence, as well as evidence relating to the unauthorised connection or use of electricity supply. This approach is important, Honourable Member, to ensure that every element of the offence can be proven and the chain of evidence can be completed before charges are brought in court. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Beruas.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Thank you, Deputy Speaker. Answering is not enough. I am raising this issue again because illegal bitcoin operators are still rampant in Manjung. TNB has complained that they cut between 100 and 150 illegal electricity connection cases to bitcoin premises every month, and electricity supply is reconnected illegally, not long after the electricity connection to these bitcoin premises is cut. From— my question, from police intelligence, is whether police officers, TNB officers or Manjung Municipal Council officers involved receive bribes from these operators, so much so that this kind of issue, which everyone sees, the police cannot resolve and eradicate. Thank you.

Honourable Member, if there is information regarding our officers involved in corruption, the Honourable Member may forward it to us for action, because PDRM does not compromise with any misconduct. The same question the Honourable Member raised earlier, until

today the Honourable Member has not reported the matter. So, I await the information which...

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Mr Speaker, I ask police intelligence— is police intelligence paralysed? That is my question.

Alright, so far...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, you cannot ask like this.

...We have already taken the appropriate actions. I wish to inform the Honourable Member that in Ayer Tawar, the statistics of cases involving Ayer Tawar, Beruas, Kampung Koh, Pantai Remis, Pekan Gurney, Segari, Setiawan, there are 65 cases involved and the raids we conducted are also high, 65— seizures 823 and arrests were also made nine, seizure of machines 823, charges we made three and so on. So far, therefore, no bribery cases have been recorded. None. So, this is based on our intelligence records. Nevertheless, I say that we at PDRM are always serious about any allegation of the involvement of enforcement officers in corruption or abuse of power, including involvement in activities of illegal electricity connection to these mining premises. So, any information or complaint regarding the possible involvement that I mentioned earlier, PDRM or TNB or local authorities will examine and investigate. So, if there is evidence, if there are elements of an offence, firm action will be taken. This is what I wish to inform, and PDRM always cooperates with all agencies to address this issue and the complex real challenges. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Padang Terap.

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

Thank you, Mr Speaker. Honourable Deputy Minister, Padang Terap wishes to raise that from all the arrests made from 2022 until 2026, there were 3,049 raids involving the seizure of 75,578 crypto machines. This is a large amount that shows an increasing trend, meaning these illegal crypto operators are not afraid of the law. So, my question is, does the ministry have plans to enact a new law or act that currently relies on the Electricity Supply Act 1990? Does the government plan to increase

Tuan Nurul Amin bin HamidPAS · PNPadang TerapEN

the punishment or fines in a new law? Thank you, Mr Speaker.

Honourable Member, the PDRM through the Ministry of Home Affairs (KDN) will continue to strengthen enforcement against these cryptocurrency mining activities through cooperation with TNB, the Energy Commission, local authorities, the Securities Commission, and this cooperation involves many aspects. We also support any sharing of data and information. Regarding efforts to strengthen legislation, it must involve all parties because this financial mining falls under the Ministry of Finance. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Tuan Haji Jamaludin bin Yahya, Pasir Salak.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

Thank you, Madam Speaker. The frog leaps and leaps, / Leaping at the edge of the swamp; / Pasir Salak's question number four, / I respectfully ask the Minister to kindly answer it.

Jamaludin bin YahyaPAS · PNPasir Salak · questionEN

4. Tuan Haji Jamaludin bin Yahya [Pasir Salak] asks the Minister of Rural and Regional Development to state the plans for developing Pekan Kampung Gajah as a local economic centre.

Datuk Hajah Rubiah binti WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, for the information of the Honourable Member, the Ministry of Rural and Regional Development (KKDW) always gives attention to efforts to strengthen community and local economic development in rural areas, including through the provision of platforms that can support community involvement and economic expansion based on local potential through the Rural Community Development Division, by providing Rural Community Centres (PKD). For the Kampung Gajah area, this approach is supported through PKD Pasir Salak located in Kampung Gajah, Perak Tengah District. PKD functions as a platform for implementing various community development activities. Among them are skills and ICT training, women's empowerment,

Datuk Hajah Rubiah binti WangPBB · GPSDeputy Minister of Rural and Regional Development · Kota SamarahanEN

community involvement, local services, and the collection and promotion of rural entrepreneurs' products. From 2023 to September 2026, a total of 93 programmes have been implemented through PKD Pasir Salak with the involvement of 1,015 participants from the local community. The programmes implemented cover capacity-building, economic, community and local community involvement activities. The implementation of these programmes has benefited and strengthened the capacity of the community and supported the expansion of economic activities around Kampung Gajah. For the same period, RM60,000 has been allocated for the implementation of programmes at PKD Pasir Salak and RM190,000 allocated for programmes across Perak state. This allocation is used to support programmes involving the local community in line with PKD's function as a community development platform in rural areas. Thank you, Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Pasir Salak.

Tuan Haji Jamaludin bin YahyaPAS · PNPasir SalakEN

Thank you, Madam Speaker, thank you Deputy Minister for the earlier answer. Pasir Salak would like to take the opportunity before putting the supplementary question to express sadness and sympathy towards the victims of the flash flood that occurred in Changkat Lada in FELCRA Seberang Perak yesterday. May Allah replace the losses with something better. Alright, Pasir Salak's supplementary question. Is the government prepared to commit to providing an integrated development plan for Pekan Kampung Gajah with specific allocation, an implementation timeline and coordination between the Federal Government, the Perak State Government and local authorities so that this town does not continue to fall behind compared with economic growth centres in other districts? Thank you.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you YB Pasir Salak for the supplementary question. Mr Speaker, for the information of the Honourable Member, large-scale physical planning and the preparation of the Town and Municipal Development Master Plan fall under the jurisdiction of the state government and local authorities, namely the Perak State Government and also the Perak Tengah District Council, in accordance with the provisions under the Town and Country Planning Act 1976 [Act 172].

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

However, KKDW plays a role as a main strategic partner in strengthening the socio-economic ecosystem and human capital of the local community to support the growth of the area concerned. KKDW can only plan and implement proposed physical and economic projects based on proposals from the state government and also the council after being investigated and given priority based on the needs of the state government.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

In terms of allocation and also coordination of implementation, KKDW channels funds for allocation or socio-economic development continuously through annual budgets and the Malaysia Plan, to ensure that the operation and high-impact programmes at Rural Community Centres, including PKD Pasir Salak, run according to the set schedule. This means, Honourable Member, comprehensive planning needs to be drawn up by local authorities, especially district offices and also the state government, which is submitted to KKDW for consideration and priority. KKDW will investigate, give priority and provide the related funds so that we can ensure the area concerned develops and benefits the local community. Thank you, Datuk Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Thank you, Deputy Speaker. My supplementary question to the Deputy Minister. We understand the government has provided a variety of rural development programmes, including very large allocations. But to what extent can these allocations increase people's income? My question is, can the Honourable Deputy Minister explain how KKDW measures the increase in household income, the addition of entrepreneurs and also employment opportunities in small towns in rural areas? Thank you.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

Thank you YB, for the supplementary question. For information, in fact, for the main development in rural areas, KKDW is the ministry that implements comprehensive physical development in towns and villages, especially rural roads, village connecting roads, electricity supply, water supply, village street lighting and so on. These programmes are carried out based on proposals from the state governments and the areas concerned.

Datuk Hajah Rubiah binti WangPBB · GPSKota SamarahanEN

To increase or expand the participation and economy of the local community, KKDW has various programmes. Various programmes for us to develop an area. In particular, we have the Desa Lestari Programme, we have the PKD Programme, we have entrepreneurship programmes and also socio-economic programmes for income enhancement, where our focus is not only to create residential areas that are prosperous and of quality but also to provide employment opportunities and economic improvement. So, entrepreneurship programmes are implemented through our agencies, by providing not only training and funding, meaning financing through our agencies, but also skills programmes that we implement across the country. These skills refer to basic community skills, especially for women. For example, skills in technical aspects and cooking. These are programmes that can provide opportunities and room for income enhancement, and through these programmes that we have implemented. For example, income enhancement programmes in particular. We provide training assistance, we provide goods or capital, and we measure the success of the project or programme based on an income increase of at least 10 percent during the implementation period and six months after the programme. So, we use this approach and, alhamdulillah, mostly, it can be said that 90 percent of the programmes we organise, especially in terms of socio-economic development, income enhancement and employment opportunities, have achieved the KPIs we have set. This question is long, Honourable Member, I have only shortened it with the earlier answer. Thank you, Datuk Mr Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Puan Hajah Rodziah binti Ismail, Ampang.

Bismillahirrahmanirrahim. Thank you, Deputy Speaker. Question from Ampang number 5.

Rodziah binti IsmailPKR · PHAmpang · questionEN

5. Puan Hajah Rodziah binti Ismail [Ampang] asks the Minister of Health to state the timeline for when the Nutrition Bill (RUU Pemakanan) to control the nutritional intake of the people will be drafted, as well as the details of the objectives, main scope of coverage, overall cost and the mechanism to ensure the involvement of health experts, industry players, consumer NGOs, the general public and other stakeholders in the drafting and implementation process

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHMinister of Health · Kuala SelangorEN

Thank you, Deputy Speaker, thank you Honourable Member for Ampang. The Ministry of Health Malaysia (KKM) is actually planning the drafting of a Bill or RUU Pemakanan that is education-oriented, with permission, educational enforcement. With emphasis on, first, the promotion and enhancement of literacy or health literacy. That is first. Second, the institutionalisation of healthy eating practices, and third, the creation of an environment that supports healthier eating among the people. Deputy Speaker, the proposal to draft the RUU Pemakanan was started in 2022 and is being implemented in phases. For the period 2022 to 2024, the focus was on conducting engagement sessions with stakeholders to obtain views and initial input on the proposal to draft this Bill. Next, for the period 2025 to 2026, the focus is on refining the scope of the Bill itself, implementing a Regulatory Impact Assessment (RIA), for example, and technical consultation and the development of the legislative framework. The drafting of the RUU Pemakanan is targeted to be completed in 2027, next year, as preparation for tabling in Parliament. Among the main scope is the protection and support of nutrition for infants and children, relating to infants and children. Second, control of the marketing of unhealthy food. Third, implementation of healthy eating in institutions and finally, the provision of an environment that supports healthier food choices. I wish to emphasise that this Nutrition Act differs from the Food Act 1983, which focuses more on matters related to regulation, safety, quality, composition and product labelling. So, the Food Act 1983 with the Food Regulations 1985 is related to products. Here, it is more about aspects emphasised as educational aspects, education-oriented with the three matters I mentioned earlier, including the environment, building culture and literacy or health literacy. The overall estimated cost will be determined based on the results of the RIA and the implementation requirements of the Bill. KKM has and is and will hold consultation and engagement sessions with government agencies, health experts, academics, industry, non-governmental organisations, consumer associations and also the general public. Views received will be taken into account in the drafting

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHMinister of Health · Kuala SelangorEN

of the Bill, to ensure that the legislation achieved meets public health needs and can be implemented effectively. Thank you, Deputy Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ampang.

Thank you, Minister. It seems, God willing, we will get this Bill in 2027. I am actually worried because if— hopefully it will not be postponed again. This is because we now see Malaysia has already become known as one of the countries whose stunting rate has risen. I think the government must take the spirit of Malaysia towards the healthcare system and have it accelerated. My question to the Minister is, what exactly is the legal mechanism to restrict? I know this is related to advocacy and so on, but to restrict the advertising and promotion of these unhealthy foods. That is what I am worried about. Because we do not have a holistic approach and it will not have such a thorough effect when we make this bill. How does the government— the second one, ensure the implementation of this bill does not increase the cost of living? Because I take the example of Deputy Speaker...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Member, just the question.

Yes, the question— I just want to give a small example. For example, when we impose a sugar tax. We find that food costs actually rise, but the people do not know that it is actually for taxation. So, I hope the Minister can answer well. Thank you.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, Honourable Member for Ampang. I know Ampang is very sensitive and concerned about this matter. First, on the matter related to cost, insya-Allah it will not be affected by this Nutrition Bill, which I would say is more based on literacy, based on education and creating an environment. What we have adopted in brief also uses what I have often mentioned as behavioral insight, or BI. I have called it the last human tool, the last human tool to make, to nudge, or to nudge with a nudging strategy, so that in the end the people can cultivate a culture of healthy living by whatever approaches. So, I think the cost will not be relevant because we emphasise aspects of cultivating a culture.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

The two are— the first one just now was on how to limit. So, we are developing this bill which, among other things, includes provisions to regulate advertising, and so on.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

And this control is proposed to cover all forms of communication and marketing, including printed materials, digital media and so on. So, that is— we will be able to implement it so that we can limit how the matter can be controlled by this legislation. That is why it is important to establish the bill, provisions, in this Nutrition Act bill, insya-Allah. Thank you. Thank you, Ampang.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Kuala Nerus.

Dato’ Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Thank you, Madam Deputy Speaker. Thank you, Honourable Minister. What was explained a moment ago was about the importance of us improving education or awareness, or health literacy, among our people. And if we look here, the National Strategic Plan to Combat the Double Burden of Child Malnutrition 2023–2030 has also outlined several regulatory initiatives, including a ban on advertising unhealthy food to children and compliance with standard menus in childcare centres. My question is, will the Nutrition Act to be drafted become a legislative instrument to strengthen these initiatives? What specific indicators and targets will be set to measure the effectiveness of this act in reducing the risk factors for non-communicable diseases, which are indeed a major problem in our country today? Thank you, Madam Speaker.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

Thank you, my friend the Honourable Member for Kuala Nerus, yes. The strategic plans have their planning, their KPIs, their indices or specific measurement matrices. The role of the strategic plan or blueprint, and also whatever has been arranged to achieve something, especially in the matter raised by Kuala Nerus as the DBM, or double burden of malnutrition, has indeed been explained and we have also begun to implement it, especially to address the phenomena of stunting and also overweight, or obesity, or underweight, occurring simultaneously among our children.

Datuk Seri Haji Dr. Dzulkefly bin AhmadAMANAH · PHKuala SelangorEN

So, all of that is also being implemented in the implementation of KPIs, in the implementation of what is called the blueprint and strategic plan. We have implemented that for a long time, but what has been missing is something like a standalone legislation, with respect, an act that takes the approach of the three matters I mentioned earlier: first is cultivating a culture; literacy; and finally the environment that we want to build. So, those two are not— the term is not mutually exclusive or mutually— they go together. It operates— the legislation needs to exist, its regulations need to exist, and the strategic planning also exists, and the strategic plan that must be implemented. Otherwise, it will remain just a plan. That is why in my emphasis, my sub-approach this time, we give more weight to implementation rather than producing document after document. So, no more white plan, no more white paper, blueprint and so on. We want footprint. We need implementation as Kuala Nerus has emphasised. Thank you, Deputy Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Mr Hassan bin Saad, Baling.

Tuan Hassan bin SaadPAS · PNBalingEN

Thank you, Mr Speaker. My question is number 6.

Hassan bin SaadPAS · PNBaling · questionEN

6. Mr Hassan bin Saad [Baling] asks the Minister of Entrepreneur Development and Cooperatives to state how the benefits of technology cooperation with Alibaba will be extended to PMKS throughout the country.

Datuk Mohamad bin AlaminUMNO · BNDeputy Minister of Entrepreneur Development and Cooperatives · KimanisEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Thank you, Honourable Member for Baling, for the question this morning. Madam Speaker, for the information of the Honourable Members, the Ministry of Entrepreneur and Cooperative Development (KUSKOP) is of the view that the e-commerce sector needs to be two-way, namely not merely becoming a channel for the entry of foreign products into the local market, but also serving as a vehicle to bring Malaysian products into international markets. This matter was also emphasised by the Honourable Minister of Entrepreneur and Cooperative Development during the APEC Small and Medium Enterprises Ministers' Meeting in Guangzhou, China recently. Accordingly, in line with the strategic action plan to empower PMKS, especially market access capabilities, KUSKOP is intensifying strategic cooperation

Datuk Mohamad bin AlaminUMNO · BNDeputy Minister of Entrepreneur Development and Cooperatives · KimanisEN

with global e-commerce platforms, including with Alibaba, to develop the Malaysia Mall initiative as a platform to promote and market local PMKS products to international markets. Following the working visit of the Honourable Minister of Entrepreneur Development and Cooperatives to the Alibaba Centre, Guangzhou on 3 September 2026, KUSKOP is exploring several forms of technology cooperation and market access as follows. Firstly, a pilot programme of Malaysia Mall for the China market through the Tmall and Taobao platforms, which targets the participation of Malaysian PMKS with high potential, as well as exploring the use of the Daraz platform to expand market access to South Asia. Secondly, cooperation between SME Corp. Malaysia and Lazada Malaysia through a memorandum of understanding (MOU) signed on 15 October 2026 during the Enterprise 50 Conference. This cooperation involves the development of the MSME Digital Export Initiative to facilitate the digital internationalisation of PMKS through the Alibaba ecosystem, including Alibaba.com, Tmall, Taobao and Lazada. And lastly, cooperation between Bank Rakyat with Alibaba and Lazada which is being explored following a working visit to Shanghai on 22 September 2026. As an initial step, Bank Rakyat will identify 30 to 50 PKS with potential to take part in awareness sessions, training and a pilot programme for e-commerce registration, as well as exploring support, financing, business advisory services and export opportunities. That is all, and thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Baling. Baling?

Tuan Hassan bin SaadPAS · PNBalingEN

Thank you, Honourable Minister. My supplementary question. The benefits of cooperation with Alibaba need to reach micro entrepreneurs in rural districts such as my area in Baling, including food and local product operators who need guidance to enter the export market. When will the pilot programme registration open, and will the ministry provide an application channel and guidance at district level so that entrepreneurs can join it? Thank you.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Thank you, Honourable Member for Baling, for the supplementary question. As I informed just now, we have indeed signed an MoU together with Lazada. Lazada is under the Alibaba Group, yes. Lazada, then we have Tmall, we have Taobao. So,

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

we will work with Alibaba and also Alibaba.com. That is why next year, Madam Speaker, we will intensify our programme further. We will go down to the ground, our roadshows, to explain the understanding that exists or the opportunities available to help our PMKS enter the international market through Alibaba and also Lazada in particular. That is why we will intensify all our offices across Malaysia, SME Corp. Malaysia in particular, to hold capacity-building programmes and training in every state to guide entrepreneurs to enter e-commerce platforms. So, we must ensure they understand how to use the e-commerce platforms we provide to help them penetrate the market and succeed in promoting and marketing their products through this e-commerce. Thank you, Madam Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Betong.

Thank you, Deputy Speaker. Deputy Speaker, various initiatives have been implemented by KUSKOP to help local entrepreneurs penetrate the international market and to ensure the effectiveness of these programmes can be objectively assessed. My question to the Deputy Minister is, what are the latest achievements of PMKS and cooperative exports in terms of the number of entrepreneurs who have successfully gained access to new markets and the total value of export sales generated? And what are KUSKOP's targets for 2027, including the number of companies targeted and the projected export sales value to be achieved? Thank you, Mr Speaker.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Thank you, Honourable Member for Betong. Under SME Corp. Malaysia, we have several programmes. What is our strategy? We provide many mechanisms of ours to help our entrepreneurs so that they have space and opportunities to penetrate the market at the international level. Under SME Corp., we have PKS BIAYA, then PKS MENTOR, PKS SKALA, PKS GLOSMEP.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

And importantly, we also guide them on how to obtain the National Mark of MALAYSIAN BRAND certification. That is why, when they have all joined these programmes, Honourable Member for Betong, they will achieve several accomplishments in terms of programmes and also their participation.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

That is why, up to September this year, yes, KUSKOP and agencies have implemented a total of 15 international programmes, yes, involving the participation of 443 companies and cooperatives with total recorded sales of RM1.5 billion, yes. And the revenue recorded, the sales revenue we have recorded, comes from companies and cooperatives in high-value sectors such as the halal industry, food and beverage (F&B), equipment, healthcare, and electrical and electronic (E&E) products. And for next year, Honourable Member for Betong, we will project, yes, many more of our programmes, about 18 programmes that we have planned for international trade involving 340 export-ready companies and cooperatives in high-value sectors such as oil and gas, electrical and electronics (E&E), semiconductors, halal, and food and beverage (F&B). These programmes include participation in international exhibitions too, yes. International exports that we will join and we will do, we will bring as many of our entrepreneurs as possible. And the projection for next year, we will target sales of RM701.9 million, including exploration of new markets such as Cambodia, Taiwan and South Korea, yes.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Summarise, Honourable Member.

Datuk Mohamad bin AlaminUMNO · BNKimanisEN

Because these are countries with potential for us to penetrate the market, to help our entrepreneurs, since our products are mostly what they are interested in. That is why we want to penetrate the markets of the countries I mentioned earlier. And this initiative is part of KUSKOP's continuous efforts to strengthen competitiveness, increase export capacity and expand the participation of our PMKS in international markets, insya-Allah. We will enhance it further next year. Thank you, Madam Speaker.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Mr Mohamad Shafizan Haji Kepli, Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Madam Deputy Speaker. My question is number 7.

Mohamad Shafizan bin KepliPBB · GPSBatang Lupar · questionEN

7. Mr Mohamad Shafizan Haji Kepli [Batang Lupar] asks the Minister of Transport to state what actions the ministry is taking to improve safety management and emergency response at all short take-off and landing airports (STOLports) operating in Sarawak following the recent helicopter crash in Long Lellang

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Thank you, Honourable Member. Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Madam Speaker, for the information of the Honourable Members, Malaysia Airports Holdings Berhad is always committed and takes a serious view in taking improvement measures to strengthen preparedness for safety management and emergency response at all STOLports. For this purpose, Malaysia Airports Holdings Berhad will implement several improvements at all STOLports throughout Malaysia. First is compliance and documentation. Malaysia Airports Holdings Berhad has reviewed and improved mandatory documents including the aerodrome manual, safety management system (SMS), aerodrome disabled aircraft removal plan manual, airport wildlife hazard management plan, standard operating procedures and related checklists. The preparation and improvement of these documents is expected to be fully completed by 30 November 2026. In addition, a workshop on the preparation of the STOLports Emergency Plan (SEP) was carried out from 28 September to 2 October 2026 in Miri to strengthen emergency preparedness and support compliance with related requirements. Second is improvement of aerodrome infrastructure and facilities. MAHB has prepared an infrastructure improvement plan for 12 STOLports with an estimated total project cost of RM131 million. The main scope includes resurfacing of the aerodrome surfaces, replacement of perimeter fencing, construction of perimeter roads and improvement of terminal buildings. The implementation of these works is planned in phases starting from 2027 and is expected to be fully completed by December 2028, subject to the procurement process and project implementation. Third is readiness of rescue and firefighting services (RFFS). To meet the requirements of the relevant fire protection category, the procurement of specialised firefighting vehicles, namely rapid intervention vehicles (RIV), which are compact fire vehicles specifically designed for operations at STOLports, has been completed, with the first delivery scheduled for May 2027.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Meanwhile, the procurement process for the construction of mini fire stations and the provision of water tanks at the STOLports involved is still ongoing. The facilities are expected to be fully completed by December 2027 with an estimated capital expenditure requirement of RM22.3 million. Fourth is strengthening of human resources and management structure. Malaysia Airports Berhad is also planning to strengthen the workforce through the recruitment of staff for operations, engineering, safety and RFFS compliance functions, as well as aviation security (AVSEC). The filling of these workforce requirements is expected to be implemented in phases until December 2028. Meanwhile, the use of RELA services and the planned involvement of the Malaysian Civil Defence Force (APM) as a transitional measure are being coordinated to support operational requirements. The memorandum of understanding (MoU) on APM's involvement is targeted to be finalised by the second quarter of 2027. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Thank you, Madam Deputy Speaker, thank you Honourable Deputy Minister for the comprehensive reply which touched on the development of STOLports across the country. On this occasion, I would like to express condolences to all the bereaved families involved in the tragedy in Long Lellang. Honourable Deputy Minister, my supplementary question is what specific plans do the government and MAHB have to improve infrastructure and facilities to ensure preparedness at the Long Lellang STOLport? And recently, a new STOLport in Bebuling was officially opened. Has consideration been given to safety aspects and so on to ensure no unwanted incidents occur? Thank you, Madam Speaker.

Thank you, Honourable Member for Batang Lupar. Yes, we do have plans for Long Lellang, as a start following the recent incident, and I also take this opportunity to extend condolences to all the families involved in the accident. So, for the Long Lellang STOLport, the improvement and strengthening of the runway structure, aircraft parking apron and taxiway are among the resurfacing works involved that will be carried out at the Long Lellang STOLport, namely related to surfacing, yes. What will be resurfaced is the apron area, which is the aircraft parking area, at an estimated cost of RM1.2 million, and also the taxiway, at an estimated cost of RM224,000, and also the runway, also at an estimated cost of RM7.191 million, and a mini mixing plant at an estimated cost of RM2 million. The overall estimated cost of improvements for Long Lellang Airport itself is RM10.615 million as an immediate measure. These resurfacing works are expected to begin in the second quarter of 2027 and are expected to be completed in the first quarter of 2028. Also, to improve the STOLport, the purchase of the rapid intervention vehicle (RIV) that I mentioned earlier, which is a compact-sized fire vehicle [Unclear] specifically designed for operations at the STOLport, will be supplied there. The size and capacity of the vehicle are adapted to meet the needs of rescue and firefighting services and the constraints of the STOLport's infrastructure unit. This purchase will raise the level of preparedness and emergency response capability at the STOLport. Another point is that deploying one RIV unit at the STOLport is sufficient and meets the standards set out in Civil Aviation Directive 14. Each Rapid Intervention Vehicle unit involves a cost of RM1.2 million. MAHB plans to add 15 staff members in phases to strengthen the operational and safety requirements of the STOLports. The additions include one STOLports lead, two technicians and one operations staff member, scheduled to be recruited in June 2027, followed by seven Aviation Fire and Rescue Services personnel and four Aviation Security (AVSEC) personnel, scheduled for December 2027.

The resurfacing works involved at Long Lellang STOLport, which will be carried out, concern the asphalting (penurapan). What will be asphalted is the apron area, which is the aircraft parking area, at an estimated cost of RM1.2 million, as well as the taxiway, at an estimated cost of RM224,000, and also the runway, likewise at an estimated cost of RM7.191 million, and a mini batching plant at an estimated cost of RM2 million. The estimated total cost of the improvements for Airport Long Lellang itself is RM10.615 million, as an urgent measure. The asphalting works are expected to begin in the third quarter of 2027 and are expected to be completed in the first quarter of 2028. Also, to improve the STOLport, the purchase of the rapid intervention vehicle (RIV) that I mentioned earlier, which is a fire engine of [Tidak jelas] size, specially designed for operations at the STOLport, will be supplied there. The size and capability of the vehicle are adapted to meet the needs of rescue and firefighting services as well as the constraints of the STOLport's infrastructure unit. This purchase will increase the level of preparedness and emergency response capability at the STOLport. Another point is that the placement of one RIV unit at the STOLport is sufficient and meets the standards stipulated in Civil Aviation Directive 14. Each Rapid Intervention Vehicle unit involves a cost of RM1.2 million. MAHB plans to add 15 staff members in stages to strengthen the operational and safety needs of the STOLports. The addition covers one STOLports lead, two technicians and one operations staff member, scheduled to be recruited in June 2027, followed by seven Aviation Fire and Rescue Services personnel and four Aviation Security (AVSEC) personnel, scheduled for December 2027.

So at present, the Long Lellang STOLport only has one AVSEC member and five RELA members to carry out the safety and emergency functions. Now, regarding Bebuling Airport, "Bebuling" is what name— it is an airport under the state, a STOLport under the state government. And at present, the infrastructure is already complete, test flights have been done, but in fact there is no result yet, not fully complied with, and the aerodrome now

still in the— no, we have not yet received an application for certification from CAAM for the aerodrome. There is also another one, which we call the Aerodrome Operating License, that has not yet been applied for. We are still waiting for the AOL, the Aerodrome Certificate. So all these items, these documents, this application must be made. God willing, once it has been approved, it will be looked at comprehensively so that whatever the name— even though it is a state, whatever the name— the state's STOLport, the CAAM requirements remain the same, just as for the other STOLports, God willing. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Setiu.

Okay. Mr Speaker, my question. As a follow-up to the tragedy that struck Long Lellang, to what extent has the ministry suspended the operation of helicopters of the same type and model until the full investigation is complete? Second, my question. We find that the helicopter used in this tragedy was 35 years old, and it was found that the helicopter did not have a flight data recorder and did not have a cockpit voice recorder. So, does the government intend to make the installation of these voice recorders mandatory, regardless of the weight limit of helicopters or other aircraft, for all operations involving medical services, as happened recently? That is all, thank you.

Thank you, Honourable Member. I think the matter of this initial investigation has already been answered by the Honourable Minister that day, during the question raised by the Honourable Dato Richard, from Betong, yes. To repeat it, the initial report was already presented to the Cabinet on 16 October. In brief, the initial investigation by the Air Control Investigation Division found that the pilot held a valid flight licence and was qualified to operate the flight, and also held a valid medical certificate. The helicopter also had a valid certificate of registration and certificate of airworthiness, yes, and was certified airworthy at the time of departure. The investigation is still ongoing, and a final report on this air accident must be prepared within one year, during which all the equipment, the engine and so on, the damaged parts, involved in the accident will— have already been sent to a laboratory overseas to examine what

prepares the engine, yes. So, that is the situation now. So, within one year we will get the— his answer on specifically why the accident happened. Secondly, on the suspension, but for now any fixed-wing aircraft (kapal terbang layang-layang) available for use in this air doctor service, which has in fact already passed the airworthiness test conducted by CAAM. So, there is no suspension, yes. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite Tuan Zakri bin Hassan, Kangar.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Thank you, Mr Speaker. Assalamualaikum warahmatullahi wabarakatuh. The state elections are over. Only four Harapan seats remain. I seek the answer from the Honourable Minister, my question number eight. Thank you. [Applause].

Zakri HassanBERSATU · PNKangar · questionEN

8. Tuan Zakri bin Hassan [Kangar] asks the Minister of Tourism, Arts and Culture to state the ministry's plans to promote and attract more tourists to visit Kampung Wai in Perlis as well as geopark areas across the country.

Tuan Chiew Choon ManPKR · PHDeputy Minister of Tourism, Arts and Culture · MiriEN

Thank you for the question from Kangar. Madam Speaker, the Ministry of Tourism, Arts and Culture (MOTAC), through Tourism Malaysia, will continue to intensify the promotion of geoparks across the country, including Kampung Wai, Perlis, by highlighting their unique geology and natural scenery. For Kampung Wai, the promotion will focus on main attractions such as the limestone caves or what is currently going viral, the 765-metre tunnel, and kayaking activities on the Wai River. MOTAC encourages Honourable Members to work together with the Perlis State Tourism Executive Committee so that we can jointly identify and develop tourism products with potential. Products that are identified may be submitted to MOTAC and Tourism Malaysia for promotional purposes. Cooperation with state governments, local authorities and industry players will also be strengthened to develop attractive tourism packages that offer, with permission, value for money, while at the same time increasing visitor arrivals and economic benefits to the local community. Thank you.

Tuan Chiew Choon ManPKR · PHDeputy Minister of Tourism, Arts and Culture · MiriEN

money, and at the same time increasing visitor arrivals and economic benefits to the local community. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Kangar.

Tuan Zakri bin HassanBERSATU · PNKangarEN

Yes, thank you, Honourable Minister. So Kampung Wai here in Kuala Perlis has great potential as a new tourism centre in Perlis. So, is MOTAC prepared to make Kampung Wai a pilot community-based tourism project by providing specific allocations to upgrade tourism facilities such as jetties, water recreation activities and the development of local entrepreneurs? And my next question, what are MOTAC's efforts to encourage tourists to stay longer in Perlis in order to drive the tourism industry? Thank you.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you for the supplementary question. For efforts to plan and implement development projects in any area, including Kampung Wai, Perlis, Honourable Member, the process is through the Perlis State Government with its agency, the Perlis State Economic Planning Unit (BPENP), and also the local authority (PBT).

[Bangun]

[Bangun]

Tuan Chiew Choon ManPKR · PHMiriEN

So, the Honourable Member may propose to the PBT and also together with BPENP to take up the project, and the proposed project is then submitted to MOTAC for us to present to the central agencies for approval of allocation. And I do agree with the Honourable Member on our efforts to enable our visitors, to encourage our visitors, to stay longer in Perlis. So, we do have several types of efforts such as the development of integrated tourism packages, enhancing the experience in various places in Perlis, and also increasing promotions and programmes. Allow me to give a few examples, such as our Perlis tourism package, the Eco Xventure Tour, for three days and two nights. If the Honourable Members are interested, you can join as well, which will include watching the sunrise at Wang Kelian, exploring Gua Kelam, a visit to Tasik Timah Tasoh and the canopy walk experience at FRIM Mata Ayer. We have also given a grant to the Persatuan Khazanah Kuala Perlis on 4 to 6 September this year to organise the Pesta Air Kuala Perlis programme at the West Flood Diversion Channel, Kampung Wai.

Tuan Chiew Choon ManPKR · PHMiriEN

In addition, the National Department of Culture and Arts (JKKN) has also organised an annual signature programme for Perlis, namely the Pesta Angin Timur programme on 6 to 8 February 2026. Besides that, we have also launched the Malaysia Cuti-cuti Experiences Campaign with the special slogan "Perlis Bukan Sekadar Transit", in conjunction with the Visit Malaysia Campaign. And for the Honourable Member's information, this year from 22 to 25 September 2026, we have organised a media visit programme to Perlis so that they will continue to promote Perlis across media coverage. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Tenggara.

Timbalan Menteri...

Thank you, Honourable Speaker. In relation to this supplementary question, I want to know about— the Honourable Deputy Minister just mentioned the programmes organised to attract visitors that are more short-term in nature. So, what Tenggara wants to ask is, the long-term strategy or studies carried out by the ministry to strengthen the branding of geoparks as a high-impact tourism product of the country, including efforts to expand promotion at the international level in order to increase Malaysia's competitiveness as a destination for natural and geological heritage tourism.

Because sometimes people come to Perlis, but they accidentally go into Thailand because Thailand has more things nearby, beautiful things. Thank you for the question. Thank you.

Tuan Chiew Choon ManPKR · PHMiriEN

Thank you for the supplementary question. For the information of the Honourable Member, this geopark— coincidentally my colleague here from NRES is also present. This geopark is normally managed under NRES, and MOTAC will work together— cooperate with NRES to study the needs in terms of the existing development or the development of integrated packages, as I mentioned earlier, based on the uniqueness of the geopark, and through promotional programmes via digital platforms, familiarisation programmes to promote the uniqueness of our geoparks within the country or abroad. And thank you for the suggestion from the Honourable Tenggara. We will continue to improve and also carry out activities, programmes and promotions to raise the name of our geoparks to the world region. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

For question number 9, the Honourable Batu is not in the House. So I invite Dato' Hajah Mumtaz binti Md Nawi, Tumpat.

[Question No. 9 – YB Tuan Prabakaran a/l M Parameswaran (Batu) absent]

Assalamualaikum warahmatullahi wabarakatuh. My question is number 10.

Mumtaz bin Md NawiPAS · PNTumpat · questionEN

10. Dato' Hajah Mumtaz binti Md Nawi [Tumpat] asks the Minister of National Unity to state the government's approach in ensuring that the national historical narrative and the building of Malaysia's national identity take into account the historical, cultural and Islamic religious position and Malay identity as an important pillar in the formation of the nation, in accordance with the framework of the Federal Constitution, while ensuring that the rights and diversity of other communities continue to be respected.

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

I invite the Honourable Minister of National Unity to respond.

Datuk Aaron Ago anak DagangPRS · GPSMinister of National Unity · KanowitEN

Thank you, Honourable Tumpat. Dato' Mr Speaker– Mr Speaker, the government is committed to ensuring that the historical narrative and the building of national identity are grounded in historical fact, the Federal Constitution and the principle of unity in diversity. The position of history, culture, Islam and Malay identity as among the foundations of the formation of the nation is always recognised, while preserving the rights, contributions and heritage of other communities who also shape Malaysia's identity. This approach has been translated through the National Unity Policy, which upholds unity in diversity as the foundation for nation-building. This policy takes into account the foundational principles of the nation enshrined in the Federal Constitution, including the Institution of the Malay Rulers, Islam as the Religion of the Federation, Bahasa Melayu as the national language, the special position of the Malays and the natives of Sabah and Sarawak, and the legitimate interests of the other races. Malaysia's uniqueness lies in the ethnic, religious, linguistic and cultural diversity that forms the national identity itself. Building national identity does not mean eliminating the identity of each community; rather, it builds a shared national identity based on the nation's history— based on the Rukun Negara, patriotism and loyalty to the country. This spirit is in line

Datuk Aaron Ago anak DagangPRS · GPSMinister of National Unity · KanowitEN

with the national coat of arms motto "Bersekutu Bertambah Mutu" (Unity Brings Excellence), which reflects strength through the unity of the people. And in line with the Thirteenth Malaysia Plan, the Ministry of National Unity has been mandated to lead the Nation-Building Agenda, which will be launched on 2 December this year, and this agenda provides an approach to the formation of national identity, the appreciation of history, national values and a sense of togetherness as Malaysians. This goes beyond merely maintaining social harmony. In this regard, nation-building is a process of forming a sense of history— historical awareness, identity, a spirit of belonging and shared loyalty to the country regardless of ethnic, religious and cultural differences. To ensure this approach is based on facts that are inclusive, the ministry also obtains the views of historians, constitutional experts, academics and also experts in sociology and culture. To strengthen this historical narrative, the government has established the National Historians Council, chaired by the Right Honourable Prime Minister himself. This serves as a strategic advisory platform that brings together historical expertise to ensure the accuracy of facts, the careful study of credible sources and a comprehensive and balanced understanding of the nation's history. This effort is strengthened through the role of the National Archives of Malaysia in preserving authentic historical records and documents, as well as the Department of Museums Malaysia in expanding the appreciation of the nation's history, culture and heritage through research, exhibitions and museum education, especially for the younger generation. That is all, thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Tumpat.

Thank you, Mr Speaker. Recently we have seen that the younger generation and sometimes tourists are rather confused when they see many violations of the national language on signboards, directories, billboards and the naming of premises in shopping centres, especially the main ones. It is as if we are in another country. So, what coordination and action has been taken by the Ministry of National Unity together with Dewan Bahasa and also the PBT, as well as KPKT, to ensure that the position of the Malay language is respected in the public and commercial sectors?

And one more matter concerning the halal issue. When people come to Malaysia, they will expect that the halal is truly halal. So, now when this matter is seen as an issue under KPKT rather than under unity, in fact it could trigger inter-racial anxiety if the halal issue is manipulated. This also needs action from the ministry. Secondly, I also want to look at and ask in terms of nation-building. We are in Asia or Southeast Asia, and there are many things we share with other countries. The issue is that in our country, we have not yet and still have many things that we have not patented or protected or registered, strategies at the international level, which may cause us to lose...

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Ringkaskan soalan.

Recognition of origin. My question is, how many heritage sites have been recognised by UNESCO, and what target will the ministry set to ensure that they can be preserved as intellectual property in our country? Thank you.

Datuk Aaron Ago anak DagangPRS · GPSKanowitEN

Many questions. Thank you once again, Honourable Tumpat. Regarding the issue of these signboards, as we in Malaysia are well aware, this falls under the KPKT ministry and also the PBT.

Tuan Haji Onn bin Abu BakarPKR · PHBatu Pahat

[Bangun]

Datuk Aaron Ago anak DagangPRS · GPSKanowitEN

And we at the Ministry of National Unity do agree with their actions, and under that, they have acts. We have the National Language Act in terms of the use of the national language, and we also have the Dewan Bahasa dan Pustaka Act to uphold and encourage the use of the Malay language. And under the PBT, we have the Local Government Act and By-laws. The PBT acts as the regulator and enforcer... [Inaudible] In terms of guidelines, we also have several guidelines under the Ministry of Housing and also Dewan Bahasa. In terms of coordination and implementation, we also constantly look at the cooperation between KPKT, DBP and the PBT in setting policy and monitoring those signboards.

Datuk Aaron Ago anak DagangPRS · GPSKanowitEN

The Ministry of National Unity does strive to uphold the Malay language as the language of unity, as the medium of common communication and also in the building of national identity. Regarding nation-building and it being said that we have not yet patented it. I also agree, Honourable Member, on Saturday I officiated a summit named The Malaysian Dilemma, and a distinguished professor of this country stated "Malaysia is a state, but not a nation." I was also shocked. Although we— when he finished his speech, I asked him, "What do you mean Sir?" "Yes, we have been talking about Malaysia since day one. What we have not come to any agreement to say that we are a nation where we have all the various ethnicities, language is consolidated, recognised, respected..."

Datuk Aaron Ago anak DagangPRS · GPSKanowitEN

And I told him, okay, if that is so, then indeed our discussion about the Thirteenth Malaysia Plan, the Unity ministry has been tasked to carry out the process of nation-building, where the state combines with the diversity that we have, it becomes a strength for us, and that is our effort. The question regarding UNESCO...

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Summarise the Honourable Minister's answer. Summarise the answer, time is up.

Datuk Aaron Ago anak DagangPRS · GPSKanowitEN

...Under MOTAC, and I hope MOTAC is here to answer the Honourable Member's question. Thank you.

Deputy Speaker (Madam Alice Lau Kiong Yieng)

Batu Pahat.

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Thank you, Deputy Speaker. My supplementary question to the Minister. Social media has now become one of the main channels for the younger generation to obtain information such as history, religion and national identity. [The Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) presided over the Sitting] What is the ministry's strategy to address the spread of inaccurate or false historical information whose content may trigger religious and racial tensions? And is the ministry willing to cooperate with the Ministry of Education or the Ministry of Communications to strengthen historical and constitutional literacy?

Tuan Haji Onn bin Abu BakarPKR · PHBatu PahatEN

Ministry of Education or the Ministry of Communications to strengthen historical and constitutional literacy?

Datuk Aaron Ago anak DagangPRS · GPSKanowitEN

Thank you, Honourable Member. This is a major problem for us at this time, where this younger generation is exposed to new technology. We hear of all kinds of technologies that have emerged and been developed around the world that can confuse our society in terms of content, the content that is exposed. We hear of deepfakes. Deepfake is a programme where untrue things can be made to appear true and may influence the ideology of the younger generation. Indeed, we work with the Ministry of Education Malaysia, the Ministry of Communications and the Ministry of National Unity, who are always cooperating in addressing various problems relating to media issues. And, in our study, one of the 10 social deficits that is very difficult for us to address is social media, apart from religion and also race. And we are always cooperating with various agencies and ministries to jointly overcome the problems of today's technology. That is all, thank you.

Deputy Speaker (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. In the name of Allah, the Most Gracious, the Most Merciful. Honourable Member, now the session for oral question time is over. [The Question Time session for Oral Answers has ended]

Motion — Sitting Hours and Business Exempted from Standing OrdersMotion

Tuan Sim Tze TzinPKR · PHDeputy Minister of Investment, Trade and Industry · Bayan BaruEN

Mr Speaker, "Under Standing Order 12(1), I respectfully move that the Sitting today shall not be adjourned until the debate and decision at the Committee Stage of the Ministry of Works and the Ministry of Transport on the Supply Bill 2027 and the Development Expenditure Estimates Motion 2027 have been completed, and that after that the Sitting be adjourned until 10 a.m., Tuesday, 17 November 2026." Thank you.

Deputy Speaker (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Is there any Honourable Member who seconds?

Datuk Wilson Ugak anak KumbongPRS · GPSDeputy Minister of Digital · Hulu RajangEN

I beg to second.

Deputy Speaker (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Good. Thank you, Honourable Member. Honourable Members, I now put the question to the House for decision. The question is that the motion as moved just now be agreed to.

[Motion put for decision; and agreed to]

Bill Brought Into the Meeting — Finance Bill 2026 First ReadingBill

A Bill entitled An Act to amend the Income Tax Act 1967; the Stamp Act 1949; the Labuan Business Activity Tax Act 1990; the Petroleum (Income Tax) Act 1967; and the Finance Act 2025 was brought into the Sitting by the Deputy Minister of Finance [Tuan Liew Chin Tong]; read a first time; to be read a second time at this Sitting.

Bill Brought Into the Meeting — Measures for the Collection, Administration and Enforcement of Taxation Bill 2026 First ReadingBill

A Bill entitled An Act to make provision for measures relating to the implementation of Tax Collection, Administration and Enforcement by amending the Income Tax Act 1967; the Real Property Gains Tax Act 1976; the Stamp Act 1949; the Labuan Business Activity Tax Act 1990; the Petroleum (Income Tax) Act 1967; the Customs Act 1967; and the Excise Act 1976 was brought into the Sitting by the Deputy Minister of Finance [Tuan Liew Chin Tong]; read a first time; to be read a second time at this Sitting.

Bill — Supply Bill 2027 and Development Estimates Motion 2027 CommitteeBill

The Order of Business was read to resume consideration of the "Supply Bill 2027 and Development Estimates 2027 in the Committee of the whole House." [Seventh Day] [House sitting in Committee] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) chairing the Committee]

Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.27 [Schedule] – Head P.27 [Development Estimates 2027] –Bill

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Members, Honourable Members, we are in— the House in Committee. Ministry of Works, Supply Head B.27 and Development Head P.27 under the Ministry of Works are open for debate. In my hand there are 27 persons who will debate. Having checked the Standing Orders, the Honourable Member for Cameron Highlands will also debate, yes. So, I will start with the first debater, the Honourable Member for Cameron Highlands, the second debater the Honourable Member for Batang Lupar followed by the Honourable Member for Hulu Selangor, the Honourable Member for Klang, the Honourable Member for Arau, the Honourable Member for Beaufort, the Honourable Member for Besut, the Honourable Member for Kudat, the Honourable Member for Langkawi, the Honourable Member for Rasah, the Honourable Member for Kulim-Bandar Baharu, the Honourable Member for Tanjung Piai, the Honourable Member for Kuala Nerus, the Honourable Member for Selayang, the Honourable Member for Labuan, the Honourable Member for Kinabatangan, the Honourable Member for Gerik, the Honourable Member for Beruas, the Honourable Member for Kuantan, the Honourable Member for Tenom, the Honourable Member for Saratok, the Honourable Member for Tuaran, the Honourable Member for Temerloh, the Honourable Member for Bentong, the Honourable Member for Rantau Panjang, the Honourable Member for Sipitang, the Honourable Member for Gua Musang and ending with the Honourable Member for Hulu Langat.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

The House begins by inviting the Honourable Member for Cameron Highlands. [Honourable Member for Cameron Highlands rises, leaves the Speaker's chair and walks to his seat]

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Honourable Speaker, who is the Speaker now?

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Honourable Member, I am also the Speaker. I chose to speak from my chair and that does not set aside any rules after checking. I will return to the chair as Deputy Speaker shortly.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Honourable Member, the chair cannot be left empty. You may appoint someone temporarily to sit there. I can sit there while you are speaking.

[Dewan ketawa]

Yang Berhormat.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

There must be somebody there.

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Yes, I am here. So, it does not break the rules— 99, 99A and 100 allow me.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

That's general, 99A itu overruled everything here.

Yes.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Tapi dalam peraturan mesyuarat yang ada peruntukan, somebody have to be there. Jadi, kalau Speaker tidak ada, ya Speaker Dewan boleh melantik siapa-siapa dalam Dewan ini untuk sementara, while you are debating?

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Honourable Member, I chose to carry out both of those things at the same time.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Ya, unprecedented Honourable Member.

Ya.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

But I am talking, I am supposed to be talking to the Chair.

I am talking to myself, to the Minister.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

Now you are down there sebagai debater.

Yes.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

This is very unprecedented.

Yes.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Dalam peraturan mesyuarat dah jelas, somebody have to be there. Kalau tidak, boleh dilantik siapa-siapa untuk mengganti sementara waktu.

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Honourable Member, Honourable Member, Honourable Member...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

We cannot be presiding without the Speaker seating there, on the Chair.

Yang Berhormat, I have gone through the peraturan. There is no peraturan that doesn’t allow me to speak here...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

That is why we have provision untuk melantik Speaker sementara Yang Berhormat. Dalam peraturan mesyuarat— temporary Speaker while the Speaker is not available on the Chair.

Yang Berhormat...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

I think that one is very clear. Tak apalah, Yang Berhormat ya. Saya cuma...

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

Honourable Member, if you think that the rule being implemented here is not— cannot be permitted, I invite you to propose it in the House. Good.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

[Laughter] The Honourable Member can appoint anyone. I can sit temporarily for the Honourable Member— I can sit for 10 minutes. [Laughter] You can appoint anyone here.

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

I choose not to appoint anyone, yes. Good, I stand here today as the Member of Parliament for Cameron Highlands. For the same period, I am also chairing the Sitting at this stage. Yes, that is clear. Chairman, for myself, I wish to ask the Minister regarding item P.27 under 8100 – Construction of New Roads. Cameron Highlands wishes to ask about the progress of the Sinderut Post Road, Lipis, whose estimated expenditure is RM350 million and whose length is 34 kilometres, which was announced in the RMK13, and also the construction of a road from the bridge at Pos Lenjang to Pos Titom, Lipis, costing approximately RM90 million. For information, the road from Pos Lenjang to Pos Titom is under the DUN Jelai area whose State Assemblyman is the Honourable Menteri Besar of Pahang himself. I understand the tender has been opened, but the latest update is that it has been postponed, where the letter of acceptance of tender (SST) has been postponed. Besides that, six other projects have also been postponed and the letters of acceptance for those contracts have also been postponed, with no time set as to when. For the information of the House, the projects concerned are the road construction project from Kampung Sungai Ipil to Jalan Hutan Melintang, Parlimen Teluk Intan, Bagan Datuk, the Honourable Deputy Prime Minister's own. The road and concrete bridge from Kampung Enggong to Sungai Mas to Kampung Bechah Salak, Kuala Krai, Kelantan under Parlimen Kuala Krai. The construction of roads and bridges connecting Kampung Kok Majid to Pulau Telok Renjuna under Parlimen Tumpat, Kelantan. Upgrading Kampung Wakaf Bunut to Kampung Saring under Parlimen Pasir Puteh. Upgrading the road from Seksyen 121, Kampung Pong, Pengkalan Hulu Perak under Parlimen Gerik. Upgrading Jalan Parit Hailam from Jalan Parit Raja Darat to Jalan Parit Karjo. Although under Parlimen Sri Gading, its ADUN is the Honourable Puan Hajah Nor Rashidah binti Haji Ramli from BN. [Deputy Speaker (Puan Alice Lau Kiong Yieng) chairing the Committee]

Dato’ Sri Dr. Ramli bin Dato’ Mohd NorUMNO · BNCameron HighlandsEN

I see that generally, all of these postponed projects are in BN and PN areas. So, Honourable Minister, I want an explanation in this House. [Applause] What is the reason? I am a little— it is rather strange. The area of the Honourable Deputy Prime Minister himself has been postponed. If perhaps the others are as ordinary Honourable Members, there must be a reason. What I want to know is, who issued this instruction and what is the reason? That is all. With this, I sit down again as Chairman. [Applause] [Honourable Member for Cameron Highlands moves from his place to the Chairman's chair]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Cameron Highlands. I invite the Honourable Member for Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

[Standing] In the name of Allah, the Most Gracious, the Most Merciful. [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)

Dato' Ngeh Koo HamDAP · PHBeruas

Perintah tetap.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Please, Honourable Member.

Dato' Ngeh Koo HamDAP · PHBeruasEN

I wish to record my sorrow. How Parliament is insulted and the rules and procedures of Parliament are not followed.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Yang Berhormat.

Dato' Ngeh Koo HamDAP · PHBeruasEN

In our rules...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Yang Berhormat.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Implicitly, during any sitting, there must be a Speaker or a Chairman, because he is the one who ensures all the rules are followed. If the Deputy Speaker speaks and he is also a debater and also the one chairing, who determines that he complies with these rules? I wish to record my sorrow and my objection so that this Parliament does not become a mockery and a source of laughter. Not only in Malaysia, but across the world. We as Members of Parliament must ensure the dignity of this Parliament is upheld and respected. So, I hope what happened just now, if

Dato' Ngeh Koo HamDAP · PHBeruasEN

followed the rules, was not followed. In my view, what was stated just now is implicit and should not have happened and should be expunged from our Hansard record. So, I know the Deputy Speaker will say there is no rule that says there must be a chair, but within every rule there is implicitly a Chairman, a Speaker presiding. So, what is already clear need not be written in this rule book. I hope everyone supports me on this issue. [Applause]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, Honourable Member for Beruas. Do you have the rule book? In the hands of the Honourable Member for Beruas?

Dato' Ngeh Koo HamDAP · PHBeruasEN

Please read all the rules on meetings. Where the Chairman or the Speaker...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, I am speaking. I did not tell you to speak. Sit down.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Just now you wanted to say, which rule?

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

I am telling you now, I am telling you to state it.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Okay, Deputy Speaker, please give your explanation.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Good. Please read Standing Order 99. The interpretation of the Standing Orders by the Speaker of the Dewan Rakyat or his Deputy is final. A motion of one's own is required to review it. So, Honourable Member, if you do not agree, move it. For the information of the Honourable Member, I do not abdicate my responsibility as Deputy Speaker. I will not at any time during that period— Honourable Member, I am speaking. Standing Order 42 for speaking...

Dato' Ngeh Koo HamDAP · PHBeruas

[Bangun]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Saya bercakap, Yang Berhormat dengar. Duduk. Saya tak habis lagi ini. I have not— dengan izin, I have not finished...

Dato' Ngeh Koo HamDAP · PHBeruas

You finish first.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

That is Standing Order 99. Standing Order 99A, failure to comply with the Standing Orders does not invalidate the proceedings of the Sitting and/or its decisions. Honourable Member, please take note of that matter. With permission, it is being ruled aside by this rule. Standing Order 100, ruling on matters not expressly provided for in the Standing Orders

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

expressly in the Standing Orders, there is silence; in this book concerning the Deputy Speaker or Speaker speaking anywhere so long as he is in the House and does not abdicate his responsibility as Deputy Speaker. I am merely moving my seat. I still chair the Dewan. That is very clear and any interpretation of anything that happens in this House remains valid. That is my decision. If the Honourable Member does not agree, the matter of Standing Order 43 is clear. You move it. I consider that...

Dato' Ngeh Koo HamDAP · PHBeruasEN

Dato' Deputy Speaker...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

I consider...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

[Bangun]

Dato' Ngeh Koo HamDAP · PHBeruasEN

...I had already stated that day that Standing Order 99 does not allow us to have a dictator Speaker or Deputy Speaker in this House. This is clear, this rule only refers to...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

The interpretation of an issue.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

That is why I proposed it that day, because there is a Deputy Speaker who does not understand the Standing Orders, we must explain it in writing so that this House does not have a dictator. So...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Dato’ Ngeh Koo HamDAP · PHBeruas

Jadi...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

I have decided, Honourable Member, sit down.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

That's right. Is it what we want...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

This honourable House becomes a House where...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

A dictator ensures we sit down or debate.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Lucky the Honourable Member sits down. I— if three times, I will make a charge against the Honourable Member. Yes, Honourable Member.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Honourable Member. Yes, I still maintain to the Honourable Member that at every moment of this sitting there must be a Speaker up there, whether a Chairman or a Speaker sitting there. That is why we have Standing Order 7(3) to appoint anyone. I suggested just now that the Honourable Member could appoint anyone to sit. Standing Order 99 does exist, but for matters enshrined in the Standing Orders, there must be a Speaker there. That one has to be respected. So, it should not— it would not cause a dispute like this if the Honourable Member had chosen to appoint a temporary Speaker, while you are debating. I do not question that you have the right to debate as a Member of Parliament, but somebody has to be there. The vacancy, the vacant chair, is something that should not have happened.

[Bangun]

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

I maintain my position from earlier, Honourable Member.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat Beluran, I abdicate dengan izin, turun sebagai not being a Timbalan Speaker during the speech. I only choose to stand there.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

Somebody has to sit there.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Is there― ada tak peraturan itu yang mengatakan saya...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

In the guidance on matters of debate, the Speaker is the reference, the Speaker guides the House.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yes.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

Speaker guide the House. Maknanya, somebody has to be there.

[Bangun]

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

The Speaker cannot be there while you are talking. You have to be there.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Honourable Member for Beluran.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

I think that is clear, Honourable Member.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Just chairing the Dewan requires a Speaker to sit here. Is there anywhere? Silent, right?

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Yes. Debate in the Dewan...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

It is...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

The proceedings in the Dewan, Honourable Member...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

It is...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

Have to be guided by the Speaker.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yes. It is convention.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

While you up...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

And I chose ...

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

While you were debating just now, ideally you should have appointed somebody. That is why we have Provision 7(3), Honourable Member.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluran

Somebody you can appoint.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Datuk Seri Dr. Ronald KiandeeBERSATU · PNBeluranEN

Let me state for the record just now that I sat up there.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Honourable Member, if the Honourable Member for Beluran also thinks what I did is not correct, propose it. We can add to this, yes. [Applause]

Yang Berhormat.

Yang Berhormat.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yang Berhormat.

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

Standing Order 36(6).

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Please, Honourable Member.

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

Yes. Prohibition on imputing improper motives, where Beruas has called our Speaker a dictator. This is an imputation of improper motives and must be withdrawn in this honourable House. Thank you. [Applause]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Honourable Member, I choose to settle that matter at this stage only. Thank you.

Honourable Mr Speaker, I refer to both my friends, Beluran and Beruas, and I think this matter is, as we know, a precedent case.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Yes.

So, I request that this matter— it may happen again in the future. So, we must have a clear guideline on this matter, and then I think in the Standing Orders of this House, I think Article 77 and 99 should be read together, Dato' Sri Yang di-Pertua. Thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Chief Backbencher, when an anomaly occurs, alhamdulillah, only then can we make improvements. But what happened just now still does not invalidate or relinquish my role as Chairman during my chairing of the House.

[Bangun]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Let us return to the business of our House. I now invite the Honourable Member for Batang Lupar.

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Calm down, everyone. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Greetings of peace and harmony, and greetings of unity and togetherness. Thank you, Dato' Sri Chairman. Batang

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

Lupar wishes to take part in the debate on the Budget 2027 at the Committee stage for the Supply and Development Head 27 of the Ministry of Works, which has been allocated RM10.8 billion for 2027. I will go straight to the first item, namely 09280 – Construction of Roads under the heading Roads and Bridges in Sarawak, which has been allocated 564.3 million for 2027. I would like to obtain details on which Federal Roads in Sarawak are listed in the 2027 construction plan using that allocation. Dato' Sri Chairman, as a people's representative who has the opportunity to hear the explanations and answers of the ministry in this honourable House, I understand that construction, maintenance and repair of roads in Sarawak are not 100 per cent the responsibility of the Ministry of Works and the Public Works Department Malaysia (JKR). This is because most roads in Sarawak, especially in rural areas, are also under the responsibility of ministries and agencies such as the Ministry of Rural and Regional Development (KKLW) and the Department of Irrigation and Drainage (JPS). Besides that, there are also state roads that are built and maintained by the Public Works Department Sarawak (JKR Sarawak) through MARRIS, and also roads under the responsibility of local authorities through city councils and district councils. Nevertheless, Dato' Sri Chairman, for most people out there, their perception is simple. All roads are the responsibility of JKR. If a road is damaged, they expect JKR to maintain and repair it. In reality, the general public does not necessarily know the differences in jurisdiction between Federal Roads, state roads, village roads or roads under local authorities. Therefore, I would like to propose that the ministry strengthen an integrated complaint coordination mechanism between Federal agencies, the Sarawak Government and local authorities, especially through the MyJalan application. Every complaint received, even if outside the ministry's jurisdiction, should be automatically channelled to the responsible agency with a follow-up monitoring mechanism until a resolution action is implemented. I would also like to obtain an explanation on the total number of road damage complaints from Sarawak received through the MyJalan application throughout 2026, including a breakdown by responsible agency, the number of complaints that have been resolved, and the number still outstanding. More importantly, does

Tuan Mohamad Shafizan Haji KepliPBB · GPSBatang LuparEN

the ministry have a time frame or standard operating procedure (SOP) set to ensure that every complaint received receives feedback and action within a reasonable period. Dato' Sri Chairman, under the same item I would also like to ask about the status of the project to upgrade the Redline Long Stretch, with permission, and Short Stretch, with permission, under the Pan Borneo Sarawak Highway. When will it be completed, especially for roads under the Redline Long Stretch such as the Durin–Salim and Batu Kawa–Padawan sections? And what is the current status of the operation of R&R along the Pan Borneo Highway alignment? Dato' Sri Chairman, in conclusion, I welcome the government's commitment in providing road development allocations in Sarawak. I hope the ministry continues to strengthen coordination among all the agencies involved so that road damage issues do not drag on merely because of confusion over jurisdiction. For the people, it does not matter who maintains the road. What matters is that damaged roads must be repaired and user safety must be prioritised. Dato' Sri Chairman, I respectfully second the motion. Thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Batang Lupar. The Honourable Hulu Selangor is invited to speak.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

Assalamualaikum warahmatullahi wabarakatuh dan salam sejahtera. Thank you, Dato' Sri Dr. Chairman. Dato' Chairman, I now move straight to Code P.27 Item 61000 concerning road upgrading.

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

I would like to draw the ministry's attention to the application for labelling Federal Road FT001 on the Kuala Lumpur–Tanjung Malim route, and also to the upgrading of Federal Road FT228 Bukit Tagar. This matter has been raised by me repeatedly in previous debates. Development is increasing and road usage is also rising. The existing capacity of the roads needs to be improved to overcome congestion and to safeguard the safety of road users. I understand that widening and upgrading works of this kind require a large allocation, but I request that

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

at least phased implementation be started. By giving priority to the most urgent locations, the priority is the widening of Sungai Keraci Bridge and Sungai Serendah Bridge, as part of efforts to upgrade route FT008 – Kuala Lumpur–Tanjung Malim. For Bukit Tagar road FT2008, there are still sections of road in a severely poor condition, especially with the development currently ongoing at Bukit Tagar and the increase in heavy vehicles using the road. So I request that in the planning of Budget 2027, the application for this upgrade be approved to reduce congestion and ensure the safety of road users in Hulu Selangor. Dato' Chairman, next, the same code, P.27 Item 51000 – Miscellaneous Construction and Item 90000 – Other Construction. I ask the ministry to explain the difference between these two items and the scope of construction involved. Is the installation and upgrading of street lights also allocated under these items? Regarding street lights, I thank the ministry, through the Malaysian Highway Authority (Lembaga Lebuhraya Malaysia, LLM) and PLUS, for the lighting improvement action on the North–South Expressway as promised, especially the Hulu Selangor stretch. Thank you also to the Electrical Engineering Branch (CKE JKR) of the Public Works Department (JKR) Hulu Selangor, Selangor, for its efforts to resolve the street light problem at Rawang Bypass following the cable theft that occurred. I see that this cable theft issue needs to be tackled more firmly and effectively. We do not want repairs to be completed only for the cables to be stolen again, eventually leaving the government bearing the losses and users having to face prolonged darkness while waiting for allocations for re-repair. I ask the ministry to state the total number of street light cable theft cases nationwide and the total losses borne for the period 2025 until now. If existing laws or acts need to be amended to impose heavier penalties, I request that the ministry coordinate this matter immediately with the Ministry of Home Affairs and related agencies. At the same time, what is the ministry's plan to expand the installation of LED solar street lights and the proposed installation of CCTV in hotspot areas identified as frequently targeted, as a step

Tuan Haji Mohd Hasnizan bin HarunPAS · PNHulu SelangorEN

to overcome that problem. I hope this matter can be examined and given consideration. Dato' Sri Dr. Chairman, lastly, still under the same code, I refer to Item 71000 – Road Infrastructure Rehabilitation. I want to relate this to the aspect of road safety, particularly the issue of tree maintenance. This issue has been raised by me previously, specifically involving tree maintenance on the Sungai Tua road, Ulu Yam, and the Batang Kali road, Genting Highlands. Although the ministry has explained that tree maintenance is under the responsibility of the local authority, namely PBT, at the implementation level confusion still occurs involving PBT and also JKR. In the end, no action has been taken until now, whereas incidents of falling trees still occur and continue to threaten the safety of road users. Therefore, Dato' Sri Dr. Chairman, I request that the ministry sit down together and coordinate this matter seriously with the Ministry of Housing and Local Government (KPKT), so that the division of responsibilities, sources of allocation and procedures for action are fully explained, right down to the level of district JKR and PBT, so that immediate action can be taken to resolve this tree maintenance issue. Thank you, Dato' Sri Chairman.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Hulu Selangor. The Honourable Klang is invited to speak.

Thank you, Dato' Chairman. I would like to refer to Development Purpose P.27 Item 02800 – Road and Bridge Infrastructure Rehabilitation, with an allocation of RM135.965 million, as well as Item 19000 – Engineering Research and Development amounting to RM36.2 million for 2027. I wish to raise three matters concerning road maintenance, innovation in road construction technology, and the development of the TuJu navigation application. Dato' Yang di-Pertua, every year the government spends a large sum of money to repair and resurface roads. However, the question is whether we are addressing the cause of road damage or merely repairing the same problem repeatedly.

In Klang, stagnant water and flooding can damage road structures, especially routes used by heavy vehicles from industrial and logistics areas. For example, Jalan Pandamaran FT3218 was once identified by the Ministry of Works (KKR) as a location facing road damage and stagnant water problems. I note that the maintenance allocation for Federal Roads for 2027 is reported to be RM2.59 billion, whereas the estimated requirement is around RM5 to RM6 billion. Therefore, I would like to ask, from the RM135.965 million under Item 02800, how much has been allocated to Selangor, particularly Klang. Does KKR have a specific approach to ensure that roads damaged by flooding do not continue to suffer repeated damage after being repaired? Every year, the government announces various plans to improve road quality, but the people out there do not feel the change; this is the reality in Klang. Dato' Chairman, under Item 19000, the allocation for Engineering Research and Development in 2027 is RM36.2 million, compared with the revised estimates of RM84.99 million in 2026, a reduction of around 57.4 per cent. I want to know why the research allocation has been reduced so significantly. Thirdly, the country needs more effective solutions for road damage. We cannot keep relying on methods of patching potholes and resurfacing the same roads. KKR needs to strengthen research into more durable surfacing materials, such as stone mastic asphalt and rubber-modified asphalt. Foundation strengthening technology and drainage systems must be more effective. We need to assess not only the initial construction cost but also the road's lifespan and long-term maintenance cost. I propose that Klang be made one of the pilot project locations for flood-resistant roads, in collaboration with JKR, local universities and research institutions. I would like to ask how much of the RM36.2 million is specifically allocated to research on flood-resistant road technology, and whether the ministry is prepared to consider this pilot project proposal. Dato' Chairman, I also wish to raise the issue of the local navigation application TuJu, developed through collaboration between the Malaysian Highway Authority (LLM) and the private sector. I want the Minister to explain the actual allocation details for the development and enhancement of this application, because the funding source may not necessarily fall under Item 19000.

I welcome efforts to develop a local navigation application, but if the government wants to encourage the people to reduce their dependence on applications such as Waze, the government needs to provide alternatives that are truly quality, stable and trustworthy. We cannot expect the people to abandon applications that work well if the alternatives offered are not yet able to provide an equivalent service. Accordingly, I want to obtain the Minister's explanation on five matters: (i) what is the total development cost of TuJu and how much public funds have been spent?; (ii) what is the method for selecting the developer company? Is it through open tender, direct negotiation or another method?; (iii) what is the cause of the technical disruptions when the number of users increases?; (iv) why was TuJu reportedly redirecting users to Google Maps for the navigation function, when this application was introduced as a local alternative?; and (v) what is the timeline and estimated additional cost to make TuJu a fully functional navigation application? I hope Budget 2027 provides adequate financing space, if needed, to ensure TuJu can be enhanced into an application that is truly capable of competing with Waze and Google Maps. That is all. Thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Klang. The Honourable Arau is invited to speak.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum warahmatullahi wabarakatuh. Malaysian citizens, young people, people of Melaka. First of all, I would like to welcome the people of Temerloh, in good health. Welcome to Parliament, 14 of you. [Applause] Tap, tap screen, guys. The Honourable Temerloh is here with his people.

First of all, before I go to B, which I want to elaborate on, I want to congratulate BN–PN, who won brilliantly in Melaka. [Applause] Congratulations to the Deputy Prime Minister. Although he was tested severely, Allah gave him victory. In victory we must be grateful, and we must be patient. To those who lost, be patient. Perhaps in the future, wallahualam. To the Minister who wants to step down, farewell and so on. [Laughter] Now I move on to the specific topic I want to discuss today, which is B.27 050700 – Special Allocation for Engineers Across Malaysia. Honourable, the Deputy Minister present today, the Minister is good, the Deputy Minister is also good, yes. I congratulate the Honourable Deputy Minister, who obtained a PhD in GST Communication. Although the government implemented SST, he obtained a PhD in GST. So he is Doctor Mat GST, then. Mat Maslan, yes. So, congratulations. Okay, we know that under this heading, the contractors who— the number is 119,036. This is according to the Hansard of 7 October 2025. Contractors G1 – 68,000, contractors G2 – 23,000, contractors G3 – 20,000, contractors G4. Of this total number of contractors, 15,185 are Bumiputera contractors who fall under the coordination— under maintenance. Honourable, surely these 15,000 are far smaller than 119,000. So my question is, how do we increase this number? But from this number, Honourable, I have already told the Malaysian people that they are now— are living under a life controlled by cartels. Of the 19,000 who received— the 15,185 who received this maintenance, we are well aware that they were obtained through a voting process. Is that voting the best in the world? Honourable, you must remember, all the voting systems in this world are now manipulated. Voting was introduced long ago, in ancient times. In this modern age, what new approach has been made so that it is fairer? If it is voting, we must remember, I want to blame the contractor who got the project, but they cannot; those who take on projects that have been voted on also cannot. Those who take projects from those who voted, because they already have machinery and equipment, are forced to continue their career. Otherwise, their equipment cannot be used. A contractor who receives a maintenance project receives only one project. The approach of giving only one each is wrong. We could perhaps say 80 per cent we give one each, but the other 20 per cent we want to

advance the contractors concerned. We have to give them a little more so that they are able to buy machinery equipment and carry out rehabilitation and maintenance work. If not, we will get a list of Bumiputera contractors who all receive commissions. They give the commission to the big contractors and they only get a commission. In the end, we only get names and they do not do the work; they only get a commission because their own share is small. What can they do? They cannot be blamed. Say they get RM50,000; what can they do? They cannot buy machinery. They earn a 10 per cent profit, RM5,000. So they take the commission, and in the end the Bumiputera list is filled but it has no effect. So, how is Honourable Dr. Maslan, who obtained a PhD in GST, going to solve this? Voting, certainly, if 10 people vote, then in a moment another 10 people vote, and it will repeat. In the end, the same people get it. Moreover, those 10 people are under the cartel that controls them. Because we cannot act against the cartel, and we cannot act against the Bumiputera either. Why? Because the Bumiputera get too little. The cartel has to survive because it has already bought machinery. So I request that this voting system be improved. Finally, Honourable, regarding item 08260, which concerns road upgrading and other matters. I want to ask the Honourable. The Ministry of Rural Development was penalised by having projects withdrawn. Does the Honourable's ministry have projects that have been postponed? I am sure there are, based on the information we have received below. So I want to ask— I want to request the Honourable one thing. First, when we allocate funds to build roads, we only build tarred roads. So in the end, tarred roads are built on top of tarred roads; all the tarred village roads across Malaysia are left hanging. The road shoulders are left hanging, because the new ones have just arrived, MARRIS has also just arrived, applied on top, on top. In the end, there is no road shoulder. I recommend, I propose strongly and fiercely on behalf of the people of Temerloh, that all allocations include road shoulders. When I held the state of Perlis before, I made sure all roads had road shoulders. But as time passed, every year there is maintenance, and they only build road on road, road on road. Secondly, a road has one hole, but they repair one kilometre stone. That is why it is common to profit.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable, please wind up.

Yes, please wind up. I support the Honourable just now. So, give me an extra minute. [Laughter] Others, never mind. But I still hold to Standing Order 99 just now. So, I support the Honourable, yes. Okay, I ask for another minute. So, I request that the allocation for these roads include road shoulders. We know what is happening now out there: plantation roads and also village roads. For plantation roads, if we lay tar on plantation roads, heavy machinery enters. In villages too, heavy machinery enters. For example, in a village there is a trailer lorry driver; where will he park his lorry? He has to enter the village. In the end, he passes along village roads. Village roads are damaged every year and must be repaired. But let the damage be concentrated. If there is a big hole, focus on that hole and repair everything; not just see one hole and repair all of them. So, I support. Today I support. On this first day I support, because of BN–PN over there. So, I support the Honourable's ministry today. On other matters I remain silent. On this one, I support. And I ask the government to give attention to what I have mentioned. Thank you, beloved Speaker. Continue with the stance.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Arau. The Honourable Beaufort is invited to speak.

In the name of Allah, the Most Gracious, the Most Merciful. Assalamualaikum dan salam sejahtera. Thank you, Dato' Sri Chairman. I would like to touch on Development Purpose 47 through Item 05100 – Major Roads in Sabah, 08230 – Bridge Construction, 08250 – Slope Protection/Repair Studies, 08280 – Road Construction and 82000 – Pan Borneo Highway. I welcome the increase in the allocation for road and bridge development in Sabah from RM721.07 million in 2026 to RM801.46 million in 2027, an increase of RM80.39 million. However, the success of an allocation is not measured merely by the amount announced, but by the extent to which it resolves the infrastructure problems faced by the people. Dato' Sri Chairman, I would like to highlight the Federal Road Beaufort–Menumbok (R502), a strategic route that connects residents, economic activities, the transport of goods, and access to the Menumbok Ferry Terminal

for travel to Labuan. I record my appreciation for the approval of this road repair and upgrading project, valued at RM100 million, under Rolling Plan 4 of the Twelfth Malaysia Plan (Rancangan Malaysia Kedua Belas). Of this amount, RM80 million is allocated for repairs to the pavement structure and slope works along 59.05 kilometres from Bulatan Bingkul to Sekolah Agama Negeri Menumbok. Meanwhile, the remaining RM20 million is allocated to upgrade the road along 1.1 kilometres from that school to the Menumbok Ferry Terminal, including the access road into the terminal. Based on the official reply of the ministry on 27 October 2025, the pavement repair works are targeted for completion in November 2026. Meanwhile, the upgrading of the terminal access route is scheduled to go through the tender and construction process in 2026. Accordingly, I request that the ministry provide the latest status of both project scopes: whether the repair works along 59.05 kilometres have achieved their targets, and whether the upgrading of the route to the ferry terminal has commenced. I also hope the repairs will cover the drainage system, the durability of the road structure and slope stability, so that damage does not recur within a short period.

Dato’ Sri Chairman, I also wish to raise the matter of maintenance of federal roads. In the official reply in the Dewan Rakyat on 4 February 2026, the ministry informed the House of a rapid-response mechanism with JKR Sabah (Public Works Department of Sabah) to ensure that damage or potholes on federal roads are acted upon within 24 hours after a complaint is received and the damage has been identified. The ministry also informed the House of the use of artificial intelligence (AI) technology to detect damage and of increased patrols and periodic inspections. I would like to ask, to what extent is this 24-hour mechanism actually being implemented in Beaufort? How many complaints were received, how many were resolved within 24 hours, and how many remain outstanding? Inspections must also be carried out proactively, especially after heavy rain and floods. The performance of the concession companies must be monitored, including the quality of road patching, road shoulders, drainage systems and also user safety. Dato’ Sri Chairman, I also wish to draw attention to the Pan Borneo Highway Sabah, particularly the Sindumin, Melalia and Beaufort sections.

This section comprises WP1 Sindumin–Melalia–Beaufort, 28.5 kilometres long, and WP2 Melalia–Beaufort, 34.7 kilometres long. Based on the reply of the Minister of Works in the Dewan Rakyat on 9 February 2026, the physical progress of WP1 is 87.79 per cent against a target of 97.64 per cent. Meanwhile, WP2 has achieved 62.31 per cent against a target of 77.87 per cent. This shows that both packages are behind the original schedule. I take note of the intervention measures of site visits and coordination with JKR Sabah and the contractors. However, I would like to obtain the latest update on the implementation target for 2027 and the completion date for the Melalia–Beaufort section. We do not want continued delays to cause the people to keep waiting for the benefits of a project that has long been promised. Dato’ Sri Chairman, the aspects of bridge safety and slope protection along the federal road network also cannot be neglected. I urge the ministry to identify bridges that require repair or replacement and to carry out safety inspections periodically. Likewise, for high-risk slopes along the Beaufort–Menumbok route, technical assessment, slope stabilisation and periodic maintenance must be prioritised as preventive measures. Not merely acting after landslides and damage have occurred. Dato’ Sri Chairman, in closing, I wish to emphasise four matters that require a clear commitment from the ministry: (i) providing the latest status of the RM100 million Beaufort–Menumbok federal road project R502, including the progress of both scopes of work and the completion date; (ii) ensuring the 24-hour maintenance and response mechanism is implemented in Beaufort and monitoring the performance of the concession companies; (iii) setting a clear restoration schedule and completion target for Pan Borneo WP1 and WP2, particularly the Melalia–Beaufort section; and (iv) providing a list of high-risk bridges and slopes along the federal roads in the Beaufort area, together with repair plans, allocations and implementation schedules. That is all, thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member for Beaufort. The Honourable Member for Besut is invited to speak.

Thank you, Dato’ Chairman. I wish to state that in October recently, the Director of the Terengganu Irrigation and Drainage Department said that as many as 460 locations in Terengganu were identified as at risk of flooding following the northeast monsoon. As many as 32 of these flood hotspots were identified in the Besut District. So, the usual consequence that the people have to face following such flood disasters is damage to road infrastructure, which will make daily life and their economic activities difficult. Therefore, a swift response by the government in rehabilitating this infrastructure is an urgent need to facilitate the affairs of the people in the affected areas. Nevertheless, in this Ministry of Works (KKR) Estimates, Item 02800 – Rehabilitation of Road and Bridge Infrastructure shows a budget reduction of 24 per cent. Meanwhile, Item 71000 – Rehabilitation of Road Infrastructure has decreased by 61 per cent. So, what is the government's actual assurance that this significant decrease will not affect efforts to rehabilitate road infrastructure in Terengganu, particularly the Besut District, which is exposed to floods every year? So, I would like to refer to several project proposals in the Besut District. One, raising the level of Road T05, sections 3100 to 3200 at Kampung Belaoh, including bridge upgrading works, raising the level of road reconstruction by 1,200 metres and related works. The amount is not much, only RM5 million. Second, raising the level of Road FT65, Jalan Cik Selamah–Bukit Besar–Kampung Raja up to Jalan Masjid Taman Ilmu, Besut, Terengganu. Not much, only RM3.7 million. Raising the level of Road T163 Pelagat–Lata Tembakah–Jalan Padang Tapong and related works at RM5 million as well. Third — fourth, upgrading Road T05 (Jerteh–Keruak), sections 24.90 to 26.60, including road markings and furniture and related works. Fifth, upgrading Road T05 (Jerteh–Keruak), sections 21.50 to 22.50 using the CIPR method, including road markings and furniture and related works.

This matter, although it falls under the Ministry of Finance, during the visit of the Most Honourable Prime Minister, he promised to allocate RM25 million to the Terengganu State Government, including the Besut District, to raise the level of roads in Hulu Besut because they were affected by floods. Next, secondly, I refer to Item 81000 – Construction of New Roads, particularly regarding the construction of the East Coast Expressway, which is an urgent need for the economic sustainability and well-being of the people in the East Coast region. For this reason, this project has been repeatedly raised by me and my other colleagues, particularly from the East Coast, in this House. I take note of the Minister's reply during the policy-level winding-up that this project will be implemented through a public-private partnership, and that further discussions are now underway to prepare the RFP document for the consideration of the Cabinet. However, the Deputy Minister, in the oral question session last week, stated that if no private party is interested in financing this project, it will be implemented — will not — LPT3 will be implemented by the government if we have money. The Minister answered yes. The Minister answered that day. So Mr Chairman, this is the limbo or cycle of answers that we have to face every time the question of LPT3 is raised. Either an explanation about bureaucratic processes that never end, or the complaint that the government has no money that has dragged on for so long. The initial estimated project cost of RM9.8 billion keeps soaring due to inflation every year. And while this project is being delayed, at the same time, the government has not been so reluctant to fully finance the RM16.8 billion cost of the LRT Laluan Mutiara project in Penang or to finance 60 per cent of the cost of the Juru to Sungai Dua Traffic Dispersal Project.

So, expecting private parties to be willing to fully finance a project needed by the people that may not be profitable for them, such as LPT3, is the same as the government letting this project become dead in the water, with permission. The difference in priorities for these projects of public interest will not only further widen the development gap between states but also increase the perception of double standards in treatment and the deficit of public trust in the government's development policy.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, wind up.

Accordingly, the government must come forward with a transparent and bold commitment to set a clear timeline and to expedite the implementation of this project. So, in conclusion, the people of the East Coast demand fair treatment, not bureaucratic excuses or the government's claim of having no money. The government must prove its clear commitment by setting a firm timeline for the LPT3 project, while also ensuring the readiness of road rehabilitation projects across the country for the sake of the people's livelihood and socio-economy. One more thing...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, 30 seconds, I am switching off your mic.

I would like to refer to Standing Order 44.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

44?

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Go ahead. Standing Order, yes.

Standing Order. Just now, it was seen that a Member used the word 'dictator' to the Chairman. But my problem is, 44(2) clearly says that, "The Chairman shall order any Member who behaves improperly or commits an act that insults the House..." The House has already been insulted, but the Chairman did not take action. I do not understand. Ha, did take action anyway. Thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, whether to take action or not, that is the Chairman's decision here. As for me, I have given consideration to the Honourable Member concerned so that this matter does not continue. If I went strictly by the book, I could do many things. But we act as best we can, considering that the proceedings of this meeting run smoothly. That is the main thing. Alright, I invite the Honourable Member for Kudat to speak.

Thank you, Dato’ Sri Chairman. I go straight to P.27, Item 05100 and also Item 08230. I would like to ask

the ministry, what are the details of these two items and how much allocation has been given to the Kudat Parliamentary constituency? Next, Item 08250 – Slope Protection/Repair Study. This is very important, Dato’ Chairman, because every fairly major road damage usually starts from slope instability. I humbly request that I be given details regarding the study of slopes in the Kudat Parliamentary constituency and how much allocation has been given to repair the slopes in this Kudat Parliamentary constituency, because the major problems of roads usually start from the implementation of slope repairs that are not systematic or not done properly. Coincidentally, in Sabah, I understand that slope repair and road maintenance are carried out by the same contractor that causes the problem, which may not be given full attention by the same contractor for the repair of both parts, namely road repair and slope repair. Next, the details of Item 08260 – Upgrading and Rehabilitating Roads. I extend my heartfelt thanks to the KKR Ministry, which has given a fairly significant allocation to Sabah, namely an increase, if I am not mistaken, of more than RM200 million for 2026 compared to 2025. This is a very significant increase in allocation. However, I see that road conditions, particularly in the Kudat Parliamentary constituency, still need a lot of improvement. On this occasion, I also humbly request from the ministry to be given details of how much allocation is for this item for Parliamentary Kudat. On this occasion too, I would like to share a little information regarding the road conditions in my area. I wish to clarify that the road from the Kota Marudu three-way junction to Pitas is under JKR's jurisdiction. The reason is, I often receive reprimands and comments from the people saying that this road is not well maintained. I humbly urge the state government, although I am speaking in the Dewan Rakyat, to carry out improvement works on roads that fall under the state government's jurisdiction. If the state government is unable to do it, hand over the roads that fall under the state government's jurisdiction to the Federal Government. Because it is the people in my area who suffer badly. So, perhaps the higher-ups at the state level may not see this as a problem, but for me as the people's representative in

this area, I feel how painful the lives of the people are when the roads they travel every day are so bad. Next, Item 08280 – Construction of roads. I humbly ask the ministry to provide special allocation or approval for the matter that I have raised in this House several times, namely to connect the end of the Pan Borneo road at Simpang Mengayau and extend it all the way to the town of Kudat. Because there is no point in the Pan Borneo road being built if it does not reach the town of Kudat. So, I humbly ask the ministry, although I feel the state government, through the relevant department that should give priority to these important roads, has not included this as a priority road, but for me, this is very important because the main route from Kota Kinabalu via this Pan Borneo road will become a dead end up to Simpang Mengayau if the road from Simpang Mengayau to the town of Kudat is not built. So, I humbly ask the ministry to include the construction of the road from Simpang Mengayau to Kudat as a priority at the KKR level. I humbly ask the KKR Ministry to be given details on the progress and also what percentage of implementation of Pan Borneo is at present. When will the Pan Borneo road up to Kudat or up to Simpang Mengayau be completed, I wonder? Thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. The Honourable Member for Langkawi is invited to speak.

Dato’ Mohd Suhaimi bin AbdullahBERSATU · PNLangkawiEN

Peace be upon you, and the mercy and blessings of God.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)

Waalaikumussalam.

Dato’ Mohd Suhaimi bin AbdullahBERSATU · PNLangkawiEN

Thank you, Dato’ Sri Dr. Chairman. I refer to pages 319–334, specifically 319–302. I take this opportunity to congratulate the Deputy Minister of Works, who gave a reply in the House sitting on 7 October 26, informing us all that there are six additional projects — projects

Dato’ Mohd Suhaimi bin AbdullahBERSATU · PNLangkawiEN

Sultanah Maliha Hospital, Langkawi, 96.6 per cent complete, four days late only; Ministry of Health (KKM) quarters 36 days late; Fossil Walk Pulau Anak Tikus five days late; Correctional Academy quarters nine days early; infrastructure of Gua Langsir, Kilim 33 percent, only 10 days early. I want to congratulate KKR Langkawi, specifically the Director of JKR Kedah, Ir. Mohd Fisal Ismail, and also the District Engineer of Langkawi, Ir. Ts. Saudara Khairul Azlan Abdullah, because they have ensured that the major projects in Langkawi are running very well.

Dato’ Mohd Suhaimi bin AbdullahBERSATU · PNLangkawiEN

I would also like to ask the Deputy Minister, what is the status of the projects that have been announced in relation to the additional building for Sekolah Kebangsaan Klebang, RM2.6 million, the additional building for SK Ulu Melaka, RM20 million, the additional building for SK Padang Matsirat RM20 million, the JPJ Langkawi Administrative Office RM6 million, renovation of the JKM office RM2 million, upgrading of the Langkawi National Observatory RM7.8 million, and the Pulau Tuba, Pulau Dayang Bunting bridge, RM90 million. So, I want to know their status: are these projects so far ongoing, progressing smoothly, or abandoned? Dato’ Sri Chairman, I also want to refer to Item 61000, and seek an explanation from the ministry regarding the projected loan of RM110 million under the Peninsula road upgrading programme for 2027. Why must the basic Peninsula road upgrading project depend on a loan injection of RM110 million in 2027? Is the national treasury already strained for the basic allocation for this road? I also want to know what project components will be financed through this loan — through the use of this loan? Who is the lender, what are the financing conditions and how will it be repaid? Next, I refer to KPI Outcome 1. The indicator showing the target percentage of infrastructure and building projects completed according to the project's early completion date. I also want to refer to Item 010300 – CREaTE or Centre of Excellence for Engineering and Technology, which increases to RM33 million for 2027 compared to RM28 million in 2026, while maintaining the number of civil servants at 153 persons. In the current pressing economic situation and the flood of issues of public infrastructure damage such as damaged roads, critical bridges and government buildings facing problems, it is not difficult for us to understand why the people

Dato’ Mohd Suhaimi bin AbdullahBERSATU · PNLangkawiEN

question the research centre, whether this centre truly translates research results into cost savings and solutions for those buildings. We also have MIROS, yet our level of excellence is still at an unsatisfactory level. My question is, can road maintenance technology be developed that is more resistant to salt water levels, especially in Langkawi, humidity and also erosion. I propose that a specific study be conducted in Langkawi. How much cost saving has been achieved through the innovation of CREaTE? Thank you, Dato’ Sri Dr. Mr Speaker.

Mr Chairman (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member for Langkawi. The Honourable Member for Rasah is invited to speak.

Tuan Cha Kee ChinDAP · PHRasahEN

Thank you to Dato' Sri Chairman for the opportunity given to me to debate at the Committee stage of the Ministry of Works. Before I begin the debate, allow me to welcome the arrival of my fellow local community leaders of the Rasah Parliamentary constituency to Parliament this afternoon. [Applause] Welcome, Rasah friends. Firstly, I want to congratulate KKR, which once again has become the ministry that receives the highest development allocation among all ministries. If last year it was RM9.6 billion, this year it is RM9.7 billion. A very large amount. It is very good, we agree because there is a need to ensure that basic infrastructure, especially our roads, is always in the best condition for the use of all road users of Malaysians. Only I want to ask the ministry, has there been any incident in KKR similar to what happened in KKDW, where for the past three or four years there has been an overspending of more than RM2 billion? Has there or not? I hope there is none. If there is a need, come here to the House, I think all Members of the House will support a supplementary budget for this ministry. The second matter is under the heading Semenanjung Roads and Bridges. There are 10 items with a total of RM4.6 billion, particularly under Item 61000 – Road Upgrading, which this time receives RM3.2 billion. Last year it was RM2.7 billion and in 2025, RM1.5 billion. A very significant increase. An increase that we support. We believe there is a need, even though it has increased substantially.

Tuan Cha Kee ChinDAP · PHRasahEN

I would like to ask the Honourable Deputy Minister who will wind up later, why it still cannot reach the level of MARRIS? I understand that under Budget 2027, the allocation for MARRIS has been increased to RM5.7 billion. We know that MARRIS is a grant to the state governments for carrying out maintenance and upgrading state roads and so on. But under the Ministry of Works (KKR) and the Public Works Department (JKR), it falls under Federal Roads. So why is there such a big difference compared with the allocation under MARRIS? On the same matter and the same item, the Honourable Deputy Minister has answered my oral question dated 21 October and my Special Chamber question dated 12 November. I do not dispute the answers, because they are answers from KKR and JKR regarding the upgrading of Jalan Labu FT362, which is now in progress, involving Jalan Labu, Section 0.4 to Section 3.1, a distance of 2.7 kilometres, costing RM500 million, approved by the Right Honourable PMX as soon as he became Prime Minister. However, what I want— the reason I raise this today is to ask the Honourable Deputy Minister. If there is time, answer orally, orally. If there is no time, perhaps a written reply is also fine. The deadline, the completion date for that upgrading project, should have been April 2028. This was the answer given in this House last year. But when I repeated the same question, the answer given was that it will be completed on 17 May. A delay of more than a year, one month, 13 months. Why did this delay occur and why was it not communicated? I request an answer because the residents of Rasah, road users, including myself, are wondering where the problem lies. Just inform us if there is a delay. There is no problem. Is the problem due to the diversion for utilities? Is it due to land acquisition and so on? I request clear and accurate information and the correct reasons regarding this matter. Next, under Item 18610 – ICT Project KKR amounting to RM21 million. I want to mention the Malaysian Highway Authority (LLM) under KKR. Its Chairman is the Honourable Member for Simpang Renggam, but when the TuJu navigation application became the talk of many Malaysians, the Prime Minister and certain other parties were blamed. It made all sorts of AI, and former Ministers of Transport, including the Minister of Housing and Local Government (KPKT) who is seated in this House at this moment, also became victims.

Tuan Cha Kee ChinDAP · PHRasahEN

The Minister of Education also became a victim. Yet its Chairman is the Honourable Member for Simpang Renggam. I am surprised why the Honourable Deputy Minister who oversees KKR did not become a victim, even though it is under this ministry. LLM should be responsible and KKR should monitor what LLM does. Do not, because of political bias, shift the blame and blame a Minister who has no connection with this ministry. So I request an answer from KKR itself: what is the current status of TuJu? We want to ask questions professionally and accurately, to the agencies involved, and not blame parties that are unrelated for the sake of mere political interests. The last item I want to mention, Honourable Chairman, is Item 89000 – Land Acquisition for Projects amounting to RM110 million. I want to ask where this project is located? Does it involve land acquisition under the Rasah Parliament for the project? I have no objection, because we know that when we implement infrastructure projects under the Akta Pengambilan Tanah, there is indeed a need to do so. I just want to obtain information. That concludes my remarks, thank you to Dato' Sri Chairman.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, the Honourable Member for Rasah. The Honourable Member for Kulim-Bandar Baharu is invited to speak.

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

Thank you, Chairman. I also rise to debate the meaning of B.27 and P.27 of the Ministry of Works. I also wish to congratulate, as Rasah did earlier, the Ministry of Works, which has greatly assisted in Kulim-Bandar Baharu Parliament with road resurfacing in my areas. Even as I am in this Parliament now, at my current location road resurfacing provided by the Ministry of Works is still taking place, even though I only submitted the application one month ago, alhamdulillah, KKR is still attending to it. Mr Chairman, for Item 61000, which is road repairs. Honourable Deputy Minister, I would also like to ask here about roads, namely the issue of road shoulders as Arau mentioned earlier. I also thank you because many roads have been built in Kulim-Bandar Baharu, in Kulim-

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

Bandar Baharu Parliament, but unfortunately the road shoulders built or made after resurfacing are, in my view, too narrow. If there is damage to a lorry or car, and they want to stop at the roadside, I think they cannot, and some of the vehicles must stay on the road. So, I want to know, what is the minimum width or maximum width that road shoulders should have, especially for Federal Road shoulders. Because I observe that in my area they are too narrow, and even if they are wide, they are not, they are not flat, they usually slope. So this endangers vehicles. And next, for the same item, which is also 61000, I would also like to ask the ministry about FT136. I would also like to ask about the ministry's inquiry regarding road upgrading, especially from Serdang to Kulim, for which I have applied several times regarding adding overtaking lanes. Since this road is about 40 kilometres from Serdang to Kulim, where I see that about 75 per cent is double white line, it is quite difficult for vehicles to overtake and they eventually take a long time to reach their destination. So, I request whether the ministry plans in 2027 to provide facilities or build overtaking lanes on FT136, especially from Serdang to Kulim, not the Kuala Ketil area. Kuala Ketil is also FT136, but I am focusing on FT136, that is, Kulim to Serdang, about 28 kilometres. To Bandar Baharu, it is about 40 kilometres. So, I request that the ministry give a serious consideration so that this matter can be resolved promptly. The second is the issue of road patching. For that, I would also like to ask the ministry, what is the method— because the roads that are covered or patched, in my view, have a very short lifespan. Sometimes two weeks, sometimes three weeks, sometimes two or three days may also pass, but what I see now is whether most of them use cold patch, which they call cold patch, that is, the tar used is not the proper— tar that is hot, they use cold tar, then they stick it on and eventually the patch does not last long. And is this what is proposed by JKR, or can it be used to prevent these roads from potholing again?

Tuan Roslan bin HashimBERSATU · PNKulim-Bandar BaharuEN

The next item is about street lights. Also under the same item, namely, does the ministry intend to improve the quality of street lights, especially in any areas? I think sometimes the street lights installed have too short a quality or lifespan. We report lamp A, lamp B is faulty, we report lamp B, then lamp C is faulty. So, what is the ministry's proposal to overcome this problem, because many issues have arisen in the area, I think lamp posts are there, but the problem is that the street lights do not function properly or their lifespan is too short. So, I also request observation or a request from the ministry, what plans or allocations will be given to Kulim-Bandar Baharu Parliament in 2027? That concludes my remarks, thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member. The last debater before we break, the Honourable Member for Tanjung Piai, is invited to speak.

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Thank you, Dato' Chairman. I would like to refer to Item 61000 — Road Upgrading. I would like to draw the attention of the Ministry of Works to the need to upgrade Federal Road FT005, especially the Johor Bahru–Pontian route from Section 35 to Section 38.5, a distance of 3.5 kilometres, in Pekan Nanas within the Tanjung Piai Parliamentary constituency. For the information of this honourable House, this route is the main link between Pontian and Johor Bahru used by residents for work, education, health and economic purposes. However, the development of residential, commercial and industrial areas has caused the existing road, which has only two lanes, to become increasingly congested, in addition to a shortage of acceleration lanes and safety facilities. In this regard, the JKR Pontian District Office has submitted a project to upgrade FT005 over a distance of 3.5 kilometres with an estimated total cost of RM267.7 million. This project has been brought for approval consideration five times but has still not received approval. The main scope includes upgrading the existing road to a four-lane dual carriageway with R5 standard, rebuilding three bridges, upgrading three main junctions, namely Taman Utama Junction,

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

Pekan Nanas Junction and Parit Pasir Junction, as well as building a pedestrian and motorcycle footbridge in front of Masjid Jamek, Pekan Nanas. This project also includes improvements to the traffic light system, road lighting, drainage and utility diversion. Dato' Chairman, I wish to stress that the benefits of this project are not only enjoyed by residents of Tanjung Piai, but also involve all residents of the surrounding areas who use this route to connect with Johor Bahru and the main development areas in the state of Johor. This project is also important to support the potential of Pekan Nanas as a medium-industry hub for Pontian district, attracting new investors and creating employment opportunities for local residents. Therefore, I request the Ministry of Works to give priority and approve an allocation of RM267.7 million for this FT005 road upgrading project under RP2, RMK13. I hope the ministry can give due consideration. For the people of Tanjung Piai, this project is not merely road widening, but a basic need that will improve quality of life, ensure travel safety and open up more economic development opportunities for the local community. Dato' Chairman, I would like to refer to Item 51000 — Miscellaneous Construction together with Item 90000 — Other Construction, regarding the upgrading project of Padang Kampung Rambah, Pontian. I want to raise— bring up the issue of delays and cost increases for the maintenance and upgrading project of Padang Kampung Rambah, Pontian, valued at approximately RM3 million. This project, which started in September 2022, has still not been completed until the initial contractor was terminated in December 2025. I have been informed that the Public Works Department has re-evaluated the remaining work of this project and estimated a cost of RM1.86 million following that evaluation. An additional allocation of RM500,000 was imposed, which was certainly needed. I have pursued that allocation from the Right Honourable Prime Minister and am grateful that approval was given through the letter from the Implementation Coordination Unit, Prime Minister's Department, dated 27 February 2026. Nevertheless, the process of obtaining a rescue contract also encountered problems. The tender opened on 13 April 2026 and closed on 27 May 2026 failed

Dato’ Sri Dr. Wee Jeck SengMCA · BNTanjung PiaiEN

to result in the appointment of a contract. Based on the decision of the Procurement Board Meeting on 27 July 2026, the tender was decided to be re-offered. What is more worrying, based on the Coordination Meeting No.2/2026, this project again requires an additional cost of RM570,000. My main question to the ministry is, why is the additional allocation of RM500,000 previously identified by JKR still insufficient, so that until now an additional requirement of another RM500,000 has arisen? What were the actual factors causing this cost increase, when the remaining work had been evaluated before the application for the additional allocation was submitted? This raises questions about the accuracy of the initial cost estimate, the scope of the remaining work, and the level of— the level of examination of the actual site conditions before the re-tender was carried out. Were there additional damages, changes in the scope of work, increases in construction material prices or other technical requirements that were only identified after the initial assessment? I want to know clearly the basis of calculation and justification for the cost increase. In this regard, I request the ministry to explain whether a detailed technical assessment and supporting documents have been prepared to verify the need for the additional RM570,000, who is responsible for verifying the cost estimate, and what steps will be taken to ensure the new estimate is truly sufficient so that the problem of cost increases does not recur after the re-tender. I want to know and stress that the delay of this project is not merely an administrative or procurement issue. It involves public facilities that should be and are to be enjoyed by the people of Pontian. If the re-tender process continues to be delayed due to cost and procurement issues, residents will once again have to wait longer to enjoy the promised facilities. That is all, thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member. Honourable Members, the House resumes sitting as the House. [The House resumes sitting as the House] [Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) presiding over the House]

Deputy Speaker (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Members, the House will adjourn for prayers, a meal and rest. Proceedings will resume at 2.30 p.m.

[The sitting was adjourned at 1.02 p.m.]

[The sitting resumed at 2.30 p.m.]

Deputy Speaker (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

[Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, the House in Committee. [The House in Committee] [Deputy Speaker (Puan Alice Lau Kiong Yieng) presiding

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

I invite the Honourable Member for Kuala Nerus.

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

Thank you, Madam Chairman. In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, greetings of peace. I will go straight to P.27, Item 02800, concerning the restoration of road and bridge infrastructure. The allocation for this item has apparently been reduced by 24.2 per cent, from RM179.3 million in 2026 to RM135.97 million in 2027. This reduction is very worrying to us because there are still many federal routes that are paralysed. Among them is Jalan Aring–Tasik Kenyir (FT036), which connects Hulu Terengganu with Gua Musang and has been closed since November 2024 due to a landslide. An allocation of RM36 million was approved in 2025, but after almost two years since this route was closed, it has still not been reopened. This closure not only inconveniences ordinary road users, but also involves residents of Hulu Terengganu, including the Orang Asli community, who have to take long alternative routes. Houseboat operators

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

and tourism operators at Tasik Kenyir have lost customers. Meanwhile, the logistics movement for the Kenyir floating solar project has also been affected. I also want to obtain confirmation from the government because, based on information I have received, repair works have only been carried out at two locations, whereas at the other five locations along FT036 there is still no allocation, and applications to the Ministry of Works and the Ministry of Economy have not been approved. My question is, how much of the allocation under Item 02800 was channelled to FT036 in 2027? When will the applications for these five locations be approved, and when is this route expected to be fully reopened? Next, Madam Chairman, regarding B.27, Item 040300 – Slope Engineering Branch. The FT036 case gives the perception that KKR only acts after a disaster such as a slope collapse occurs, and it seems there is no study and monitoring carried out for preventive measures. Moreover, when looking at the allocation for the slope engineering branch, it has been reduced from RM8.36 million to RM8.17 million for 2027. And the permanent positions remain only 93, whereas its functions include drafting preventive policies and slope safety management systems, which are very urgently needed. I also want certainty from the government as to why, for the State of Sabah, there is a specific item, Slope Protection/Repair Studies valued at RM68.6 million in 2027, but there is no equivalent specific item for Peninsular Malaysia? Therefore, will the ministry carry out a comprehensive technical study on the soil and slope conditions along the FT036 corridor? And what is the target number of high-risk slopes on the East Coast federal routes to be monitored in 2027? Next, Madam Chairman, Item 60000 – Road and Route Upgrading has been reduced by 35.9 per cent, from RM159.2 million to RM102.1 million for 2027. East Coast tourism depends heavily on road access. The Kuala Besut Jetty, for example, is the main gateway to Perhentian Island. However, highway connectivity to northern Terengganu remains lagging because the East Coast Expressway Phase 3 (LPT3) shows no signs that it will be built in the near future. Yet the existing coastal road, the main road to these tourist areas, is frequently damaged every time the Northeast Monsoon arrives. For example, the incident at Jalan Pantai Batu Rakit in Kuala Nerus

Dato' Dr. Hj. Alias bin RazakPAS · PNKuala NerusEN

...which collapsed, still undergoing restoration work. It collapsed due to the large waves of the Northeast Monsoon in September 2025. I would also like to raise the matter of a dangerous bend on FT003, Jalan Kuala Terengganu–Kota Bharu, at the boundary of Kuala Nerus–Setiu District, namely between FELDA Belara and Simpang Kuala Ping. Although amber warning lights have been installed, they are always broken. Therefore, I would like to know the status of the earlier application, namely the proposal to approve the bend in order to prevent accidents from recurring. My questions are: first, how much is the allocation under Item 60000 for roads to tourist attractions in Terengganu, including the route to Kuala Besut Jetty; and second, why is LPT3 not funded by the Federal Government, when it is important for narrowing the development gap in the East Coast region? In conclusion, Madam Chairman, roads are not merely infrastructure but the economic lifeline and safety of the people. International studies in various countries have shown that rural road access affects people's income, agriculture, health, education and social justice in governance. Therefore, the success of a road cannot be measured by traffic flow alone, but by the extent to which it opens socio-economic opportunities for local communities. Repairs must be swift, prevention must take priority, and access to the east must be funded fairly by the Federal Government. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Kuala Nerus. I invite the Honourable Member for Selayang.

Tuan William Leong Jee KeenPKR · PHSelayangEN

Thank you, Mr Chairman. I refer to Item 020000 – Road Infrastructure Development and Construction Industry Development. Item 030000 – Building Infrastructure Construction. Item 60000 – Upgrading of Roads and Routes and Item 61000 – Upgrading of Roads. The Rawang Industrial Road Upgrading Project (FT3209) is delayed and two extensions of time have been granted. The delay of this project is caused by pre-construction administrative obstacles, namely the complexity of utility relocation, land acquisition, as well as soil investigation, soil test and

Tuan William Leong Jee KeenPKR · PHSelayangEN

incomplete overhaul drilling (mengerubuti lubang gerudi), which requires redesign and additional piling work. The problem of project delays is not unique, and on the contrary is often experienced by projects under the supervision of the Public Works Department (JKR), which is the main cause of variation orders (VO) and extensions of time (EOT).

Tuan William Leong Jee KeenPKR · PHSelayangEN

The first point concerns land acquisition. Delays in handing over clean land ownership prevent contractors from commencing work. The problems include, among others, disputes over complicated land ownership compensation and outdated records, squatters, and site encroachment. The second point concerns utility relocation that is not mapped and not carried out, and only once work begins do we see that utility amendments must be made, and time is taken to appoint nominated subcontractors from the agencies. The third point concerns inadequate ground investigation. When this happens, the project stops when the design most needs to be redone. So my proposal is that these matters should not be left until the time the contractor begins work. Land acquisition can be carried out before the contractor starts work, in cooperation with the land office and the excavation department, to ensure the land is suitable, the work can be carried out, and squatters and so on are cleared beforehand. Likewise with utility relocation, this too must be done before the contractor's work begins, by carrying out utility mapping, and the appointment can be made by the main contractor; there is no need to wait until the agency that owns the utility appoints a subcontractor, because that subcontractor will not cooperate with the main contractor and this delays the project. So, this is my proposal that JKR should take note that the reasons that today form the basis for work not being completed on schedule can be avoided by changing the existing SOP. Thank you. I support the motion.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Selayang. I invite the Honourable Member for Labuan.

Thank you, Mr Chairman. I refer directly to Item B.040500 – Public Works Department of the Federal Territory of Labuan and Item P.820 Pan Borneo Highway. I would like to raise several key issues that require serious attention and formative action from the Ministry of Works. Madam Chairman, first, allow me once again to bring up the Labuan Bridge issue, which I have already debated at the Policy Stage, and I did not get a clear answer. Once again I would like to ask about the current status of the feasibility study on the Labuan to Menumbok Bridge. Has the study been completed and finalised? If it has been completed, what is the government's decision? If not, what is the reason for the delay and when will it be finalised? As Madam Chairman is well aware, this bridge is not merely an infrastructure project, but an economic necessity to manage— to reduce the cost of living of the people of Labuan. Second, I ask the Ministry of Works to review the road maintenance concession in the Federal Territory of Labuan. I request the Ministry of Works to review the appropriateness of continuing the road maintenance concession system in the Federal Territory of Labuan, which has been in operation for more than a decade. Labuan is only a small island. What is the rationale for road maintenance work to continue to be concentrated in a single concession company, when the Labuan JKR has its own technical and administrative role? This concession system has caused complaints because it closes opportunities for small local contractors, especially G1 contractors, to obtain road maintenance work. I do not want privatisation policy to ultimately create an economic monopoly that closes the door on small contractors' livelihoods. If the evaluation finds that this concession no longer provides the best value to the government and the people, I ask the Ministry of Works to consider terminating the concession in accordance with its terms and contract and returning road maintenance responsibility to the Labuan JKR. I ask that the Honourable Minister consider it. Third, the delay of the Pan Borneo Highway Sabah project. Labuan has an interest. The people of Labuan have an interest in this project because it is the only road used by the people of Labuan when they wish to go to Kota Kinabalu, whether for emergencies, health and so on.

Imagine, Madam Chairman, from Labuan to Menumbok takes one and a half hours. From Menumbok now to Kota Kinabalu takes almost two and a half to three hours. If the person going to Kota Kinabalu is heading to Queen Elizabeth Hospital and is in a rather critical condition, I am confident and believe that with the current condition of the road, they may not even reach the hospital. Among the causes I have raised, I ask the government to look at it again and review it carefully. We are always debating and blaming contractors. I have served as Chairman of the Labuan Corporation and as Chairman of the Tender Board. I have identified previously that among the causes of weakness is sometimes at the technical level. In the case of Pan Borneo, I ask the Ministry of Works and the Malaysian Anti-Corruption Commission (SPRM) to investigate thoroughly the consultants who oversee the Pan Borneo projects in Sabah, and why delays in payment occurred. I have met several contractors who asked for an explanation of why the Pan Borneo roads in Sabah are in worse condition compared to Sarawak. Among them, the government owes tens of millions, and some companies are owed hundreds of thousands of Ringgit, and this has not been resolved. What is presented, what is brought forward, is that the contractor is wrong, this contractor is wrong. No leader has asked why JKR, SO, SOR, and the consultants who certify payments, which I have heard, Madam Chairman, supposedly, if they want to sign certified payments, must be paid a certain percentage. And this must be investigated. If not, the problem of Pan Borneo will never be resolved.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Labuan.

Madam Chairman, I would like to support it, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

I invite the Honourable Member for Kinabatangan.

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

Thank you, Madam Chairman, for the opportunity given to Kinabatangan. The first is Item 82000 – Pan Borneo Highway. The Pan Borneo Highway should be a catalyst for Sabah's development and not a project that tests the patience of the people. Based on the Auditor General's Report No. 2 of 2026 tabled last October, only four

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

of 35 work packages were fully completed as of the audit period in March 2026, while nine packages are categorised as troubled projects. As a result, residents in Kinabatangan continue to face dusty roads in dry weather and muddy roads when it rains, and prolonged traffic disruption due to these unfinished projects. Accordingly, I demand that the ministry explain the actual rehabilitation schedule for each package, the total extensions of time approved, the additional costs borne by the government, and firm action against contractors who fail.

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

If there is a need for an audit, please do it. Not only the projects currently in progress, but also the Pan Borneo roads that have already been completed must be audited for their quality. Madam Chairman, second, Item 08260 – Upgrading and Rehabilitation of Roads. I have previously raised the very poor condition of Kinabatangan's roads, as if driving on the surface of the moon. I take note of the allocation of RM18 million for emergency repairs involving Package WP25, Kampung Perpaduan Datuk Moh to Sukau valued at RM8 million and Package WP26 Sukau to Kampung Lot M valued at RM10 million. However, the main question is what is the actual status of their implementation and whether the work meets safety specifications. In addition, immediate attention must also be given to the Sukau roundabout to Pekan Sukau road as well as the Telupid to Tongod route as the lifeline connecting the interior to the East Coast. Based on information received, maintenance at present focuses only on hotspots and often causes vehicles to get stranded before repairs are carried out. At the same time, Jalan Jeruku, which was scheduled to be tarred for 23 kilometres from the end of the existing tarred road to Kampung Simpang 4 Jeruku, is still not implemented until now, even though the allocation has been made available and it was scheduled to begin on 3 July 2026, and the allocation is already available. I understand the contractor failed to start work because they are still waiting for approval of the land acquisition and handover of the site between the Public Works Department and the Land Office. Therefore I urge the ministry to resolve this bureaucratic red tape immediately and, at the same time, allocate maintenance funding

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

specifically for the main routes in the interior of Kinabatangan, especially the road leading to Kampung Dagat. Item – third under Item 08250 – Slope Protection and Repair Studies. There are complaints about collapsed slopes that take two to three years to be rehabilitated on the route from Sandakan to Batu 32. Up to today, I believe it has been three years and still cannot be rehabilitated at this time. Therefore, I propose that the ministry establish a dedicated slope maintenance concession for Sabah to cover monitoring of high-risk areas and emergency action. Why are these dangerous slopes left for years? Does the ministry want to wait for loss of life before taking action? Madam Chairman, fourth, Item 020100 – Policy and Development and Item 020200 – Road Branch. When work is passed down through too many layers of subcontractors, profit margins shrink, payments are delayed, and construction quality is ultimately compromised. Therefore, I urge the ministry to tighten monitoring of the subcontracting chain, ensure that the allocation for G1 to G4 contractors is truly enjoyed by small local contractors, and guarantee orderly payment. Main contractors must not simply collect profits without effort, while construction responsibility is transferred to other parties. Madam Chairman, fifth, under Item 89000 – Land Acquisition for Projects. The issue of delayed land compensation continues to worry residents in Sabah. Why is there a difference in valuation rates between land lots, and how long must owners wait for payment? Therefore, the ministry needs to explain the coordination mechanism with the state land authorities, set a reasonable payment period, and provide an objection channel that is easily accessible to residents, especially in rural areas. Madam Chairman, in closing my speech, Kinabatangan requests support. Thank you very much.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Kinabatangan. As the Honourable Member for Gerik has not yet come in, I invite the Honourable Member for Beruas.

Dato’ Ngeh Koo HamDAP · PHBeruasEN

Thank you, Madam Deputy Speaker, for allowing me to debate at the Committee Stage, Ministry of Works. I would like to raise two matters. One matter concerns Item 02800, namely Federal Roads and Bridges in Peninsular Malaysia. I would like to ask the government, why have the drains along the main road of Ayer Tawar in the Beruas area not been cleaned for a long time? In front of the Santai 43 restaurant, a semat tree has even grown in that drain. Likewise, the drain on the main road of Beruas and in front of House No. 23 Jalan Parit Beruas has long been blocked and filled with sand. Every time I ask why these works have not been carried out, the answer is that there is no allocation. Drain-cleaning works will not cost much. Only the works— I hope these drain-cleaning works can be carried out promptly, considering that the monsoon season is currently upon us. If these drains are not cleaned, they will bring about flood disasters. The second matter is Item 030000 – Building Infrastructure Construction. The Ministry of Works always gives the excuse of no allocation whenever a work cannot be carried out. I find that the estimated development costs of MOW projects are very high compared to the estimated costs made by the private sector. I would like to get an explanation of how these MOW cost estimates are made. Whether the existing costing method can be improved so that the government can save money and use it where it is needed. I will give three examples. The first example, the overpass at Batu 16 Ayer Tawar, Perak, cost RM6.2 million. The private sector's estimate, even half the price, would be sufficient. Likewise with the second example, the bridge from Ayer Tawar to Beruas, FT071/17/300, which cost more than RM8 million. It crosses a stream of only about 30 feet. Before it became a bridge, there was only a twin culvert, and its size cost RM8 million. Likewise from the private sector's estimate, half the price of RM4 million would be sufficient. One more example, recently the government announced an allocation of RM52 million to rebuild Sekolah Kebangsaan Balaban Jaya in Beluran, Sabah. I fully support this project, but the estimated cost for

Dato’ Ngeh Koo HamDAP · PHBeruasEN

is too high. The scope of this project is only to build six classrooms, one administrative development block, special rooms, four teachers' quarters units and supporting infrastructure. And I think if we asked the private sector to estimate, half the price would be sufficient. Therefore I hope the government can provide an explanation and, if possible, improve the costing method for projects to save money for projects that need to be implemented. Thank you, Madam Deputy Speaker.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Beruas. I invite the Honourable Member for Gerik.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Assalamualaikum warahmatullahi wabarakatuh and good day. Thank you, Madam Chairman. In the Budget 2027, under the purpose of Supply B.27, Item 050600 – Payment of Street Light and Traffic Light Bills for Federal Roads throughout Malaysia is allocated RM54 million. In addition, there is an allocation under Item 040000 – Maintenance of Immovable Assets amounting to RM153.7 million, including Item 040100 – Road Facilities Maintenance Branch amounting to RM13.95 million. For development allocations, under the purpose of Development P.27 there are several items related to road infrastructure, including Item 02800 – Restoration of Road and Bridge Infrastructure and Item 61000 – Upgrading of Roads. I would like to raise the issue of the provision and installation of street lights. Street lights are an essential facility that is very important in ensuring the safety of road users, especially at night.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

There are still many Federal routes on rural roads, in interior areas, at junctions and in accident-prone areas that lack sufficient lighting. I am of the view that the time has come for the government to expand the use of solar LED street lights more comprehensively, especially in areas far from electricity supply. This approach will not only improve safety but also reduce dependence on conventional electricity supply.

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Madam Speaker, I would also like to request an explanation from the Minister on whether there is a specific allocation under Development Purpose P.27 for the installation of new solar LED street lights in 2027. If there is, what is the amount, and what are the project code and expenditure details used? I also propose that the Ministry of Works (Kementerian Kerja Raya, KKR) prepare a special programme for installing solar lights on Federal Roads throughout Malaysia, with an annual target and priority given to rural areas and accident black spots. Madam Speaker, I would also like to draw particular attention to four main Federal Road routes in the Gerik Parliamentary constituency that urgently need the ministry's attention. First, FT004 Jalan Raya Timur Barat. Although there are street lights at several locations, there is still a need to add more installations, while the existing lights are not lit or some have been damaged. I request that these lights be inspected and replaced urgently. Second, FT076 Jalan Gerik–Pengkalan Hulu–Baling. I would like to emphasise the small district area of Pengkalan Hulu, particularly along the route from Kampung Lalang to Kampung Pahit, Klian Intan, the Bukit Buluh area and as far as Pekan Keroh. This area requires additional solar lights or street lights to ensure the safety of residents and road users. Thirdly, FT007 Jalan Pengkalan Hulu–Betong, to Thailand. This route is the country's border entry point and is also used by tourists. Providing adequate street lights is very important to ensure safety and to protect Malaysia's image in the eyes of tourists entering our country. And the fourth, and the one I stress most, is FT1157 Jalan Kampung Air Panas–Felda Nenering–Kampung Lalang, a route near the Malaysia–Thailand border. This route passes through plantation areas, forest and quiet areas with poor lighting. This situation not only increases the risk of accidents, but can also make security monitoring difficult and open up opportunities for cross-border crime, including smuggling. Therefore, the installation of solar lights on this route is very much needed and should not be postponed. And finally, Madam Speaker, I would like to take this opportunity to convey a message of condolence to the family and also to JKR Hulu Perak (Public Works Department, Hulu Perak) on the loss of Mohamed Fitri Aslam bin Mohamed

Tuan Fathul Huzir bin AyobBERSATU · PNGerikEN

Jamaludin, a JKR officer who passed away while on duty for JKR works in the Gerik and Lenggong Parliamentary constituencies. So, I ask the House to recite al-Fatihah on behalf of the deceased. Al-Fatihah. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Gerik. I invite the Honourable Member for Kuantan.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Thank you, Madam Chairman, for giving Kuantan the opportunity. So, I will go straight to Head B.27, Item B.020000 – Road Infrastructure and Construction Industry Development, and I will combine it with Item B.010300 – JKR Engineering Centre. I would like to raise an issue that is close to people's lives, namely the durability of road surfacing in our country. So, Malaysia is an equatorial country that receives rain throughout the year, and we often see roads that at first look fine, but after continuous rain begin to crack, become potholed and eventually deteriorate. The question is whether the surfacing technology and specifications we use today are truly suited to the weather conditions in our country. A new road is patched or resurfaced, but after the rain it is damaged again. Then we patch it again. So, if this situation recurs, it not only inconveniences users but also involves continuous government expenditure. Madam Chairman, local universities have carried out various studies on road surface durability. USM and UTM researchers are studying asphalt damage caused by moisture, while UMPSA found that the use of recycled asphalt together with crumb rubber has the potential to increase strength and resistance to deformation. UiTM researchers, meanwhile, are studying approaches to increase the durability of pavements against heavy rain and climate change. This means we actually have local expertise and research results that can be harnessed for use. So the question is, to what extent have the results of this university research been translated into actual use in road projects under the KKR? Slightly related to SOPs and patching quality. Once a new patch is done, the road is still fine, but when it rains, it becomes not fine again. For example, in my area of Tanjung Lumpur, at Kampung Derhaka, they patched several areas, but they are still uneven. If we ride a motorcycle, we will feel the bumps. Another one is at the head of Tanjung Lumpur Bridge, heading towards Kuantan city, and Kuantan city heading towards Tanjung Lumpur. So this area is the same. After patching, there is not much difference. So vehicles can bounce if they pass here, which is dangerous, Madam Chairman. So my question is, how does JKR (Public Works Department) monitor the patching SOPs and the quality of contractors' work? We are worried whether JKR, once patching is done, only relies on photographic reports from the contractor. So I request a response from the Honourable Minister. Item P 02800. Many footbridges have been built near schools. I would like to inform the House that the footbridge near SJK(C) Chung Ching, Jalan Tanah Putih, is getting old. Its polycarbonate roof has cracked and come loose, and its stairs, of split iron type, have begun to rust and endanger users. So the question is, does JKR plan to replace the iron stairs with a sturdier, longer-lasting and safer concrete structure?

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

It will be felt in its bumps. Another one is at the head of Jambatan Tanjung Lumpur heading towards Kuantan city, and Kuantan city heading towards Tanjung Lumpur. So this area is also the same. After patching, there is not much difference. So vehicles can bounce if they pass here, it is dangerous, Madam Chairman. So my question is, how does JKR monitor the patching SOPs and the quality of the contractors' work, and we are worried whether JKR, only after patching is done, is satisfied with photographic reports from the contractor. So I request a response from the Honourable Minister. Item P 02800. Many footbridges are built near schools. I would like to inform the House that the footbridge near SJK(C) Chung Ching, Jalan Tanah Putih, is getting old. Its polycarbonate roof has cracked and come off, and its stairs, of split iron type, have begun to rust and endanger users. So the question is, does JKR plan to replace the iron stairs with a sturdier, longer-lasting and safer concrete structure? Madam Chairman, still under the same item. It is rather unfortunate for Sekolah Menengah Tanjong Lumpur, particularly at Kampung Derhaka and the surrounding housing estates, which have to cross the Tanjung Lumpur road that has four traffic lanes without footbridge facilities. This situation is very worrying, especially during busy traffic in the morning and evening. I have repeatedly raised this matter in this House. In April 2023, I brought it to the Special Chamber. The Minister's answer had to be elevated to the state government. On 17 April, we sent a letter to the district JKR, and the district JKR confirmed the construction proposal we sent. Next, in October 2023, we debated it again in the Budget 2024. The reply received was that the application would be examined. In July 2024, the KKR informed us that the project falls under BPEN Pahang. So we sent it to BPEN and proposed that it be included in the RMK12. Then in November, during the November sitting, in December we raised it again in the budget debate. The KKR's answer was that it had received the application. The application had been received, but it was not approved due to limited financial constraints. So from January to April 2025 we sent it again to BPEN Pahang, proposing that the application be elevated to the RMK13, and on 22 April BPEN gave us a letter stating that the application had been elevated. So in August to October, during the 2026 debate, we asked again about the project and the status of this project, and in October 2025 the shocking answer was that the KKR had not received anything from the state.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

So on 27 January 2026, I brought this issue up again in the debate in February 2026. The written reply from the KKR during the Royal Address debate stated that they still had not received a formal application from the Government of Pahang. So my question is, what are the JKR's criteria in determining the need to build footbridges near schools? Is it based on traffic volume, vehicle speed, when students are present, or accident records? So I request that the KKR, through JKR, carry out a road safety assessment on the Kampung Deraka route at Sekolah Menengah Tanjung Lumpur to determine the need for a footbridge or a safer crossing facility, without having to wait for another accident to happen, and this study must be carried out in the morning when students are crossing to go to school, or at noon when students are also returning home from school. And finally, Madam Chairman, I would like to know the status of the U-turn construction project on Jalan Kuantan–Pekan. I brought this matter to the Special Chamber in 2025, early in 2025, and the Deputy Minister stated that an allocation of RM2 million had been approved. However, to this day the construction work has not yet started. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Kuantan. I invite the Honourable Member for Tenom.

Thank you, Mr Chairman. I will refer directly to Item 82000 – Pan Borneo Highway. Tenom requests the ministry to clarify the issue of the termination of the services of the project deliver partner, with permission, PDP, for the Sabah Pan Borneo Highway Project. What is the rationale for the termination, and to what extent does the method of implementation affect the cost, physical progress and completion schedule of the project? The ministry must ensure that changes to the implementation structure do not cause repeated delays, so that the people of Sabah do not continue to suffer hardship as a result of stalled construction. Tenom also requests that this matter be referred to the Public Accounts Committee (PAC) so that the scope of a comprehensive investigation into the Sabah Pan Borneo Highway Project can be requested, including examining the basis and implications of the decision to terminate the project delivery partner (PDP) model, as well as the performance of the contractor.

Mr Chairman, Item 08260 – Upgrading and Rehabilitation of Roads. I would like to raise the construction of overtaking lanes in hilly areas along the Keningau–Tenom Road. This route is often used by heavy vehicles that move slowly, causing long queues of vehicles and prompting dangerous overtaking. Accordingly, I request the ministry to carry out a safety assessment and identify strategic locations for the construction of additional lanes to reduce the risk of accidents. Mr Chairman, thirdly, Item 08280 – Road Construction. Traffic congestion in Tenom town is increasingly worrying, especially at the times when school students are dropped off and picked up. The existing route is no longer able to accommodate vehicle movement smoothly during peak hours. Therefore, Tenom requests that the ministry expedite its consideration of proposed alternative entry and exit routes to Tenom town, including widening the existing roads. Tenom also requests that the ministry consider an alternative road at RTM Benut. Mr Speaker, Item 08250 – Study on Slope Protection/Repair. Tenom requests that the ministry give attention to the need for slope protection on the Jalan Ulu Tomani–Kaang and Sumambu roads, including along the Tenom–Kuala Tomani Road. Risk assessment and preventive work need to be carried out before a slope failure occurs that could endanger lives and sever road connectivity. Mr Chairman, Item 08230 – Bridge Construction. Tenom requests that the ministry consider the proposed construction of the Ponontomon Bridge to improve the safety and connectivity of residents. Recently there was an accident involving the Ponontomon Bridge area because vehicles skidded, as the Ponontomon Bridge is currently a wooden bridge. Therefore, I request that the ministry help us upgrade the Ponontomon Bridge to a concrete bridge. Tenom also requests that the ministry clarify the status of the upgrading project for the Kemabong–Rundum Road under the RMK13 and ensure that the maintenance of street lights and safety infrastructure in Tenom receives due attention. In concluding my speech, Tenom asks for support. That is all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Tenom. I invite the Honourable Member for Saratok.

Datuk Ali anak BijuBERSATU · PNSaratokEN

Thank you. Greetings and thanks to the Deputy Speaker for the opportunity to take part in the debate at the Committee Stage on the Ministry of Works (Kementerian Kerja Raya, KKR). Referring to Item 82000 – Pan Borneo Highway, with an estimated budget of RM1.380 billion. I would like to highlight the main issues faced in the development of rest areas (rest area), involving the shortage of buildings or stopping places, location planning, facilities, management and maintenance. The Pan Borneo needs to be supplemented with adequate R&R developments so that drivers' journeys are comfortable, complete, safe and able to reduce the risk of accidents caused by fatigue. R&R, Rehat & Rawat. There are R&Rs that drivers cannot use because of, perhaps, the lack of clean water supply, such as at R&R Ali Cok and Sungai Arip, Julau and Semanok. Other issues include the shortage of toilets, parking spaces for large vehicles, buses and lorries, food and drink stalls, petrol stations, lighting and CCTV, and rubbish disposal sites. We do not know whether the responsibility for solving these problems lies with the Federal Government or Sarawak. In addition, what steps will the management take to encourage the participation of local residents in the development of R&Rs, in order to benefit the socio-economy of local traders? P-turn. For information, at present many drivers on the Pan Borneo use P-turns as temporary R&Rs, and this causes rubbish to be dumped everywhere at the P-turns, which have no rubbish bin facilities. Therefore, I urge the authorities, whether the Federal Government, Pan Borneo or local government, the district council, to jointly carry out maintenance and management to ensure cleanliness at these P-turns. Provide rubbish bins, collect rubbish, dispose of rubbish and cut the grass at the P-turns. Put up more warning signboards, "Do Not Dump Rubbish", must be made. Moreover, some of these P-turns are being used as parking spaces for heavy vehicles, especially at night. Some junctions have also been turned into temporary parking areas. This is very dangerous for other drivers passing through the area. Telco network. I have received information that Sarawak recently announced the construction of 40 telecommunication towers along the Pan Borneo. I welcome this statement. The question is whether this initiative has been

Datuk Ali anak BijuBERSATU · PNSaratokEN

discussed beforehand with the KKR to ensure that the construction of these telco towers is truly urgent and cannot be postponed. This is because drivers' perception is that the problems at the P-turns, flyovers and road maintenance should be prioritised, as they are urgent needs. Does the JENDELA initiative not overlap in the provision of this telco network? Is the budget of any telco along the Pan Borneo route a KKR budget? What is the scope of the Federal Government, the KKR, and what is the scope of the Sarawak government in the improvement of the Pan Borneo in Sarawak? Referring to Item 20000 – Construction of Grade-Separated Junctions and Flyovers. Estimated budget 2027, RM10 million. Pedestrian footbridge facilities. I would also like to raise the problem of pedestrian footbridges in school areas, where many children and parents cross the road while climbing over the road divider to reach their destination on the opposite side, against the flow of traffic. Indeed, many pupils also rush to run across the road without realising that traffic is driving very fast. The schools I am referring to are those near the Pan Borneo, namely SK Berayang, SK Lichok and also at Simpang Saratok. And with this, I would like to end my speech by supporting it. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, the Honourable Member for Saratok. I invite the Honourable Member for Tuaran.

Thank you, Madam Chairman. Tuaran refers to Supply Head B.27, Item 040100 – Road Facilities Maintenance Branch, and Development Purpose P.27, Item 82000 – Pan Borneo Highway. The Pan Borneo Highway is used by the people every day for various purposes, including sending children to school and transporting produce. However, this highway has been completed very late for a long time, and the people are wondering what the main factor behind the delay is. Meanwhile, throughout the construction, the safety of people passing along the half-completed road must be protected, and the work must keep moving until it is completed. For example, road safety along Work Package 8, namely from Bulatan Berungis, Tuaran to Bandar Sierra. There are construction areas that are dark at

night even though workers are still working and vehicles continue to pass. Road users need to be able to clearly see the lanes, diversions and obstacles ahead. Tuaran would like to ask, since construction began, how many accidents have occurred and how many lives have been lost along this alignment? How many incidents happened at night, and have accidents caused by insufficient lighting been identified as a contributing factor? Tuaran asks the ministry to obtain complete records from the PDRM (Royal Malaysia Police) and to table them in this august House. Do not wait for the next accident before action is taken.

Ensure that the contractor provides adequate temporary lighting. Clear warning lights and signboards. JKR (Public Works Department) needs to help conduct inspections at night so that the actual conditions can be seen for ourselves. Grass cutting is also not carried out on a regular basis. Grass that blocks visibility at junctions, bends and signboards must be given priority. Tuaran asks that the grass-cutting schedule be adhered to and that the work be inspected before payment is certified. Madam Chairman, the longer the construction drags on, the longer the people bear this hardship. Therefore, the second point is the delay of the Pan Borneo project itself, which has been much debated by colleagues in this august House. We often hear of problems with land acquisition, utility relocation, contractor performance and so on. The people want to know definitively: how will these problems be resolved thoroughly? Why are land and utilities still obstacles after construction has begun? As for the sections of the site that are already ready, does the contractor have sufficient workers, machinery and materials? Both of these situations need to be explained so that responsibility can be determined fairly. Tuaran proposes that every problematic package have a clear recovery plan. State the obstacles, the responsible parties, the target completion dates and the target completion. Submit it clearly in writing so that every extension of time, particularly for packages passing through the Tuaran Parliamentary constituency, can be reviewed so that we can monitor progress and act immediately when work begins to fall behind. Next, Tuaran asks that this experience must become a lesson for phase two, Tamparuli, Ranau. Tuaran wants to know whether the alignment via Kiulu will be finalised, as the Honourable Minister has previously stated in this August House.

Tuaran proposes that the alignment start from Telipok and not from Pekan Tamparuli, passing through Mukah, then heading towards Kilimu, Ranau, and that we use tunnel technology and so on, so that this can avoid a lot of land acquisition as well as environmental impacts. Tuaran asks the ministry to evaluate this proposal in terms of safety, soil and slope conditions, cost and benefits to residents. Involve the villages that will be affected so that land matters and residents' needs can be addressed earlier. What is the ministry's position on this proposal, when can the alignment be finalised, and what is the allocation for 2027 for preparatory work? Certainty of the alignment enables design and the planning of land and utilities to be arranged before construction begins. Madam Chairman, Tuaran asks for only three commitments. Ensure safety now, restore the delayed construction and finalise the phase two alignment via Kiulu. The people want to go out to earn a living and return home to their families safely. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Tuaran. I invite the Honourable Temerloh.

Assalamualaikum warahmatullahi wabarakatuh and greetings. Temerloh would like to take this opportunity to debate Item 61000 – Upgrading of Roads, under the Ministry of Works. First, the issue of road safety on the Mentakab Bypass. Temerloh wishes to raise the condition of the Mentakab Bypass route, particularly the route from Kampung Desa Bakti towards Kampung Sempadan and also Karak. This route has several rather sharp bends, which pose a risk to road users, especially at night, when it rains and when road conditions are poorly visible. The question is, has the ministry, through JKR, conducted a road safety audit on this route? Does the ministry intend to carry out road geometry improvement works, straightening risky bends where appropriate, installing warning signs for sharp bends, reflectors and road barriers at locations identified as dangerous?

Temerloh also wishes to propose the issue of the absence of street lights on that route, to the point of raising the issue of the absence of street lights, which causes conditions to be extremely dark at night. The question is, when can the ministry install street lights on the Mentakab Bypass route to guarantee the safety of users along the entire Mentakab Bypass? Second, street lights on the Karak–Temerloh Highway, Mentakab Bypass–Karak, Chenor Toll to the Kampung Awah junction. Temerloh also wishes to draw attention to the condition of the Karak–Temerloh Highway, particularly from after the Karak Toll Plaza to the Chenor Toll heading towards the Kampung Awah junction. It is dark with winding roads. Along this route, there are areas without adequate street lighting. This situation is very worrying because this route is a main route used by various categories of vehicles, including heavy vehicles, express buses and users travelling at night. We cannot take the aspect of road lighting lightly because it is closely related to the driver's visibility range and risks accidents. Temerloh proposes that the ministry consider using solar-powered street lights, particularly in those areas. This method could be an alternative to reduce dependence on conventional electrical connections as well as the long-term energy costs. The question is, does the ministry have plans to install street lights along the route after the Karak Toll Plaza through Temerloh to Kuantan? Can the ministry consider installing solar lights as a solution to the lighting problem on this route? Is there a specific allocation for installing street lights in high-risk areas along the highway? Third, upgrading of Federal Road FT07 Kuala Lumpur–Kuantan under the Thirteenth Malaysia Plan. Temerloh also wishes to bring up a very important development need for the people of Temerloh, namely the application to upgrade Federal Road FT02, the Kuala Lumpur–Kuantan road, from kilometre 235.80 to kilometre 246.

This route is among the main roads that connect residents with public amenities and health services, particularly Sultan Haji Ahmad Shah Hospital, to go directly to Maran. The increase in the number of vehicles and traffic density makes the need to upgrade this route increasingly urgent. Temerloh requests that the project to upgrade this road be considered under the Thirteenth Malaysia Plan, with a proposal to widen it to a four-lane dual carriageway to increase road capacity, smooth traffic movement and reduce the risk of accidents. The question is, has the FT02 road upgrading project been listed in the Thirteenth Malaysia Plan? If not, what is the ministry's justification for not giving priority to this route as the main access to Temerloh Hospital? Finally, the need for special road shoulders for motorcyclists. Apart from widening the road, I would like to propose that the design of the FT02 upgrading project at Batu Empat, Kampung Paya Pulai, take into account the provision of road shoulders that are suitable and safe for motorcyclists, as well as other roads deemed necessary. We must realise that motorcycles are among the main modes of transport for the people, particularly workers, students and residents in rural areas. In many situations, motorcyclists are forced to share space with heavy vehicles and high-speed vehicles. Therefore, finally, the design of new roads must take into account the need for suitable lanes and road shoulders for motorcycles with safety features such as good road surfaces, adequate lighting and safety separators where appropriate. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Temerloh. I invite the Honourable Bentong.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings. Thank you for giving Bentong the opportunity to take part in the debate on the Supply Bill 2027 at the Committee Stage. Madam Chairman, Bentong wishes to raise several key matters to the Ministry of Works.

First, referring to Item B.27.040100 – Federal Road Maintenance Allocation for the year 2027. Bentong bears a very high traffic burden through the federal routes FT008 Bentong–Gua Musang, FT218 Bentong–Raub, FT68 the Old Gombak–Bentong Road and FT9 Karak–Simpang Pelangai, which serve as the main alternative roads whenever there is extraordinary congestion or an accident on the Kuala Lumpur–Karak Highway. Therefore, Bentong would like to request details from the ministry. What is the breakdown of the periodic maintenance allocation for the Bentong District for 2027? In particular, the need to repair road surfaces damaged by heavy vehicles on FT68 and FT9, and also to repaint road markings that have faded in misty areas such as Bukit Tinggi and Genting Sempah and other areas, as well as maintenance of the shoulder drainage system.

How often is the maintenance of drains and road shoulders carried out? How is the distribution of the maintenance concession funds ensuring that the concession companies comply with JKR technical specifications, when resurfacing work in Bentong often fails again just a few months or a few weeks after repair? Madam Chairman, referring to P.27 Item 60000. Bentong requests that the improvement of Jalan Simpang Ketari be taken up for 2027. This is not the first time this matter has been raised. Bentong has frequently raised this issue, because it is very important for the people of Bentong and at Ketari, as once the ECRL is completed, it will certainly and definitely have a very great impact on the people of Bentong in the Simpang Ketari area. Bentong asks for the ministry's consideration and wisdom in selecting and approving this project for 2027. Turning to Items B.27 040300 and 040100. Federal roads in Bentong, including the road to Janda Baik and Genting Highlands, are high-risk zones for slope failure and falling tree incidents. Bentong would like to obtain three assurances from the ministry. First, what is the allocation for the repair and prevention of critical slopes for the Bentong Parliamentary constituency in 2027? Will the collapsed slope facing the entrance of the Aminuddin Baki Institute Genting Highlands branch also be listed?

And also, what are the guidelines and the specific allocation or implementation mechanism for the work of pruning and felling mature trees, the overlap of jurisdiction between the District JKR, the concession companies and the local authority (PBT) when falling tree incidents occur? What is the status of technical inspection and risk level assessment of critical slopes along the Bentong–Bukit Tinggi–Genting Sempah route and the route leading to Kampung Janda Baik? Next, Madam Chairman. The next matter concerns Item P.27 18610 regarding the ICT project of the Ministry of Works (KKR). What is the ministry's position on the TuJu application? Is there any plan to improve this application and whether it can be integrated with the MYJalan application for the purpose of transparent complaint monitoring? Apart from that, out of RM40 million under Item B.27, 050700, how much is received by each District Engineer, particularly in Bentong, and what is the scope of work for which the use of the allocation under this Item is permitted? Lastly, Madam Chairman, Bentong also wishes to raise the matter of B.27, 040200. How much is allocated to the Bentong District for building maintenance work, such as at the Quarters of the Bentong District Police Station and so on? Therefore, Madam Chairman, Bentong concludes the speech. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Bentong. I invite the Honourable Rantau Panjang.

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh and greetings. Thank you, Madam Chairman, for giving me the opportunity to debate together on Motion B/P.27 – Ministry of Works. Touching on Item 050700 concerning the maintenance of Federal Roads. I would like to know the extent of efforts made to overcome the problem of road quality, which is much disputed, especially on the main roads, which cause subsidence and endanger users. I have also been involved in a road accident. One of its causes was an uneven road. So, I would like to know, to what extent is this matter taken seriously? Likewise the problem of damaged roads, roads damaged by floods and likewise landslides, potholed roads, and some roads that are dark and lacking adequate lighting.

I also, together with other colleagues, suggest that solar-based street lights be increased, and likewise that road shoulders be widened. Because this is also a contributor to road problems. So, what strategies does the ministry use to produce better quality roads, especially in flood-prone areas? If we look at our neighbouring country Thailand, they use a lot of cement-based road that is mixed with other materials, with tar and so on, and it has proven to last longer, especially in areas with high flood risk. Second, Madam Chairman, I would like an explanation of Item 02800 relating to road infrastructure upgrading and bridge construction. Which, according to the information given to this House, more than 1,089 bridges aged over 50 years, built before 1972, still exist in our country. So, to what extent have efforts been made by the ministry to make an open report to the public to ensure that these old bridges do not endanger users? Because, in this unpredictable season, especially the flood season, it can cause bridges to collapse and endanger users' safety. So, to what extent are efforts being made to protect especially these old bridges? What action has the ministry taken to overcome this problem? Likewise, I would like to request that the approval for the construction of a bridge at Culvert 5 on the main road between Pasir Mas and Rantau Panjang be considered urgently, which every single year, when faced with floods, faces a very big problem, namely when this road's water, during major floods, exceeds head height. Yet this is a main road that connects for safety, for health, for public transport, to school, for delivering welfare aid and so on. So, I hope this matter will be considered by the ministry to ensure that the construction of a bridge to replace the main road at Culvert 5 in Rantau Panjang is expedited, so that this road can provide comfort, especially in the monsoon season. The next thing I would like an explanation on relates to Item 61000, concerning the upgrading of roads and "projek sakit" (troubled projects). So, I would like to know, what is the total number of troubled projects across the country so far? What is the loss

being borne by the government? What efforts are being made to overcome the problem of these troubled projects? What actions have been taken and what are the main causes that occurred? I would also like the list of troubled projects in Kelantan and especially within my Parliamentary constituency. And finally, Item 08250, namely concerning the study on slope protection and repair. What is the government's strategy to overcome the risk of landslides, as well as with regard to slopes that endanger? So, so far, how much allocation has been given especially to critical dangerous areas, which face risks that can cause danger to the community? So, I hope that all the issues raised here will be given attention by the ministry, God willing. Thank you, Madam Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Rantau Panjang. I invite the Honourable Sipitang.

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, greetings and Malaysia MADANI greetings. Thank you, Honourable Chairman, for the opportunity and space given to Sipitang to take part in the Committee Stage debate on the Ministry of Works today. Therefore, Sipitang would like to focus attention on several key matters that require urgent attention and serious action from the ministry. First item. Item 08230 – Bridge Construction. Monitoring the status of the Sungai Pengarah Bridge project at Kilometre 3.40, Ulu Sipitang–Sungai Bubus Road, Sipitang. This project is very important to the local residents because the bridge is not merely a link between two banks, but a link between the lives of the people and economic opportunities, education and basic amenities. Based on the progress report up to 25 October 2026, the physical progress of this project is 75 per cent compared with the scheduled progress of 79 per cent, that is, a delay of four per cent or equivalent to 26 days. The original completion date of 9 September 2026 has been extended through EOT Number 1 for 227 days, making the new completion date 24 April 2027. However, it must be reminded that the approval of this extension is not a licence to extend the delay.

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

Sipitang hopes that JKR will carry out close, regular and effective monitoring. Contractors must be put under appropriate performance pressure so that every remaining work is completed according to the timetable that has been set. Honourable Chairman, the second matter under Item 08260 – Upgrading and Rehabilitation of Roads is the need to provide sufficient allocation for the maintenance of existing roads in the Sipitang District. Apart from talking about the construction of new roads, we must not forget roads that have been built but left to deteriorate without proper maintenance. For example, the road from Kampung Bukau towards the Kampung Lumadan junction and the existing road around Padas Valley.

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

Although the Pan Borneo Highway project works are under way, the maintenance of the old roads by the concession contractors must not be forgotten and must always be monitored. This is important because potholed roads, surfaces that sink and become wavy, road shoulders that are eroded and worn thin, and drainage systems that are blocked are not merely physical defects but a threat to the safety of road users. Do not wait for a road to collapse before acting, and do not wait for an accident to happen before looking for the cause. Good maintenance is prevention that saves lives, time and the people's money. Honourable Chairman, when we speak of development, let us not measure progress only by development or tall buildings or large allocation figures, but also measure how far basic facilities can be enjoyed by the people at the grassroots. Real development is not merely beautiful in plans but must be felt in the daily lives of the people. In this context, Sipitang wishes to bring the attention of this honourable House to the condition of roads in the N.34 Lumadan area, which need urgent attention and action. Based on the list of damaged roads and the proposed maintenance submitted, there is a need for repairs involving approximately 79.741 kilometres of road covering 33 route segments, including Jalan Kampung Bintuka, Jalan Kampung Suasa, Jalan Kampung Weston, Jalan Kampung Gerama and also Jalan Kampung Bangkalalak. Therefore, Sipitang hopes that the ministry will not merely take note of this list of damage but give serious attention in terms of the priority of implementation, the provision of allocations, and also the setting of a schedule

Datuk Matbali bin MusahBEBAS · GRSSipitangEN

maintenance. The people do not want development that is only grand in announcements, while they still face the reality of damaged roads. Do not merely build hopes through promises but prove them through action. Do not merely announce progress, but ensure that progress reaches every village and is felt by every citizen. Honourable Chairman, Sipitang also wishes to raise the need to upgrade Jalan Lintas–Kampung Luagan, Sipitang, a length of 1.55 kilometres, from a gravel road to a tarred road. The road, which was originally built under RMK10, is not merely a connecting route but is an important lifeline for residents around Kampung Luagan and Kampung Batu 7 Pantai to the town of Sipitang. Honourable Chairman, as Members of Parliament entrusted with the mandate by the community and the people, Sipitang came to this honourable House to convey their voice so that it is heard by the highest leadership. Therefore, we request the ministry's attention to all the matters we have raised with clear certainty, a reasonable timeline and decisive action, not merely fine and sweet words in the reply. Because in the end, the measure of a ministry's success is not in the beauty of the language spoken in the House but in the real change felt by the people on the ground. That is all, Sipitang requests support. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Sipitang. The Honourable Member for Gua Musang is not in the House. I invite the Honourable Member for Hulu Langat.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace, greetings of Malaysia MADANI, greetings of unity, greetings of RAHMAH. P.27 61000 – Road Upgrading. Then P.27 21000 – Construction of Grade-Separated Interchange. In debating the matters relating to this Ministry of Works, at this Committee stage, in previous sessions too I have spoken on the construction of flyovers, Chairman. There are four flyovers that I have requested. The first is in Bandar Seri Putra. Bandar Seri Putra is located right on the border between Hulu Langat and Seremban. Ha, where is Rompin?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Rompin, ah. Ha, Rompin, yes. It is a border. This border is between Hulu Langat and also Seremban near Negeri Sembilan. That is the first. Then the second, meaning the flyover at Taman Prima Saujana, Kajang. Ha, Taman Prima Saujana, Kajang. Then the third, at Pekan Batu 14 Hulu Langat. Ha, that is definitely needed. Because on weekends, especially at peak hours, it is definitely jammed, definitely congested. Then the fourth, at Pekan Semenyih itself, in front of the Masjid Pekan Semenyih itself, a flyover must already be built. Because the Deputy Minister is also here, and the Deputy Minister is happy because he has just achieved victory in the state of Melaka. Congratulations and good wishes we extend. Only, these young ones here do not know where they came from. Welcome we extend to these young ones. This is a Parliament sitting. If the gavel is below, that Honourable Member we call Chairman. If the gavel is above, we call him Mr Speaker. Ha, this is a form of education, really. Later, if you become Members of Parliament, it will be easy to understand. Good. That is the first. Then the second, matters relating to upgrading this road. The first is that I want to request from Batu 10 Kampung Melaka all the way to Pekan Batu 14 Hulu Langat. I have been informed there is already an allocation in the Malaysia Plan, but I do not know which Malaysia Plan this is. Just hearing the story, right. Just shifting, shifting, shifting, right. Listen— I have been informed that nearly RM380 million has been allocated and approved for upgrading the road from Kampung Melaka Batu 10 to Pekan Batu 14 Hulu Langat. Then the second, also upgrading the road from Semenyih to Banting. Because this road is quite jammed, a rather congested road. Because this route is used by residents within the Hulu Langat Parliamentary constituency and also surrounding areas within the Hulu Langat Parliamentary constituency. Then further, Chairman, I also want to request, if possible, the government through this Ministry of Works, because there is one road, Jalan Cheras going to Kajang, that is— that is a highway. The distance of this highway, Rompin, the distance is only 11.5 kilometres. Built in 1999. The construction cost of this highway is RM282 million, RM282 million. This highway, this expressway, is now almost 28 years old. I want to request that, if possible, the KKR abolish this toll. There should be no need for a toll anymore, I think, it is almost 29 years. The cost is RM282 million, surely the company has not yet made a profit.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

RM282 million. Kuala Krau, surely the company has not yet made a profit, it can be abolished now, I think.

Tuan Haji Kamal bin AshaariPAS · PNKuala KrauEN

That was PH's promise, to abolish tolls.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

No, no. That is not there.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Abolish tolls, may I come in briefly?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Ha, yes, you may, you may, you may. Ha, go on.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Hulu Langat. When we say abolish tolls, I also hope, eh, the Minister is also here, at Tol Bestari Perdana at Cahaya Baru, it is only five kilometres, but the one-way toll is RM1.85 going, and RM1.85 coming back again. Residents have complained. I hope the government can also abolish this toll. Thank you.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Just include that...

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Hulu Langat, Hulu Langat. Hulu Terengganu, may I? Tolls too.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Time is up, Hulu Terengganu.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Just a little, just a little.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Hulu Terengganu, in a moment you will be asked to debate, in a moment.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Just a little, just a little. Do you agree...?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Not anymore, not anymore.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Not just that toll, we abolish all tolls. What is Hulu Langat's view?

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Ha, insya-Allah, insya-Allah. Insya-Allah, I agree with the view from Hulu Terengganu just now. Good. For the toll just now, I want to request that it be abolished. Regarding the toll just now, from Cheras to Kajang. Then, the bridge, Deputy Minister. I have heard that the construction and upgrading of the bridge at the village junction to enter Kampung Sesapan Rembau has already been approved. Quite close to the Negeri Sembilan border. This village is truly right on the border. If a bit further, Langkawi, Pekan Beranang. A bit further from Pekan Beranang, it is already in Negeri Sembilan. I have heard the allocation is already there, RM6.8 million. This allocation is made by KKR, not by me

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

allocation. Later outside they will say the Hulu Langat Member of Parliament, later he will say masyuk lah, he says. No, this is an allocation made by KKR. Then next, matters...

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila gulung.

Tuan Mohd Sany bin HamzanAMANAH · PHHulu LangatEN

Ha, wait. Two more points. Matters relating to this bond. This bond for contractors, developers, and companies that get work from KKR, this bond is RM30,000. I think RM30,000 is just too small. I request that, if possible, the bond for contractors, developers and also companies that get work from KKR be increased. Then the last, Chairman, matters relating to this flash flood in front of Kampung Pacat. We want to upgrade the drain and also the culvert there. I heard we have applied for an allocation of RM800,000. I request that it be expedited. And finally, I want to extend my immense and boundless thanks to JD JKR Hulu Langat, Ir. Haji Zamri Mohamud, who has helped me greatly. This person, this man is tall, his face looks a bit Hindustani. But one cannot get close to him. Because if we get close, our eyes will be dazzled because he is shining. Thank you, Chairman. That is all, wassalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Hulu Langat. I invite the Honourable Member for Putrajaya.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Thank you, Tuan Yang di-Pertua, for the generosity of allowing me to debate this evening. Firstly, Item 040100 – Road Facilities Maintenance Branch, as well as under Roads and Bridges Peninsular, Roads and Bridges Sabah, and Roads and Bridges Sarawak, especially Items 02800, 31000, 60000, 61000, 71000 and 81000.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

If we look at every budget, the government spends billions of Ringgit every year to build new roads and maintain existing roads. Yet every day we see the people down there complaining about how the roads in their areas, the roads they pass through every day, are potholed and uneven. This story has been told at length, has been told for many years.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

When I listened to the debates by other fellow Members of Parliament, they also touched on the same matter. Why has this matter dragged on for so long. So, we are in one world, where today even passenger aeroplanes already use electricity and are cutting-edge, ships already use electricity, ferries use electricity. Yet we in Malaysia are still talking about potholed roads. For years, that is our story, roads uneven, resurfaced once, two months later need to be resurfaced again. So, I want to ask the JKR, throughout this very long period, the government has spent billions of Ringgit on resurfacing or maintaining new roads, is there not one technology that can be used or a new approach in the context of constructing and resurfacing these roads that can ensure these roads last longer and can be used well, and the maintenance money can be saved. That is the first. Second, I want to touch on compensation for road users who suffer injuries due to accidents caused by damaged roads, or compensation for road users whose vehicles are damaged due to damaged roads or potholed roads or uneven roads just now. [The Deputy Speaker (Dato' Sri Dr. Ramli bin Dato' Mohd Nor) chaired the Committee] At present, there is no comprehensive claims method. As it is, it depends on the company that maintains the road or depends on which concession maintains the road. So, I request that the government look at this approach. The company that maintains the road and the concession that maintains the road must take responsibility. If not, accidents happen because of damaged roads, and they wash their hands of it. Each one washes their hands because the user must produce evidence that is very difficult. So, if the government can look at it, whether using MYJalan in this context, which is currently used for reporting road damage. If possible, also use MYJalan to enable users to make claims, but at the same time users must show the appropriate evidence. Next, I want to touch on the implementation of a multi-lane free flow (MLFF) system, or in other words,

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

barrier-free tolling system. Referring to Item 020100 — Policy and Development. This barrier-free tolling system has been used in foreign countries for a very long time. I still remember when I was in Australia, there were indeed no toll barriers. But what happens here, we see every day that one of the main causes of jams on this road is the use of tolls with barriers. Everyone must stop at the toll. I still remember when we were in— in the Cabinet previously, the use of this barrier-free tolling system was once discussed. So, my question to the KKR, when will this barrier-free tolling approach begin to be implemented and why has the government taken so long to implement this barrier-free tolling system? Finally, Tuan Chairman, regarding these LED solar street lights. I hear many fellow Members debating why the government does not use these LED solar street lights. If we look at this matter, it is actually a good opportunity for the government to save costs. It is true the cost to install them at the initial stage is high, but if we take into account the long-term cost, surely the government can save costs much more. So, I propose that it be looked at comprehensively regarding the use of these solar street lights, especially in the context of avoiding the issue of cable theft and other maintenance matters and including electricity bills. Thank you Tuan Yang di-Pertua.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Putrajaya. Now I invite the Honourable Deputy Minister to reply. Time: 30 minutes.

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

Assalamualaikum. Greetings of peace. I have a long reply in my hands. I hope to answer as much as I can. Before that. Sweet basil grows in the town, / Above the board, cotton flowers; / Thank you, KKR says, / To the 28 Honourable Members who debated. This Ministry of Works, Honourable Members, we received the highest development allocation from the other 28 ministries. On the table of the Honourable Members, there is this coloured paper and in it is mentioned

Datuk Seri Dr. Haji Ahmad bin Haji MaslanUMNO · BNDeputy Minister of Works · PontianEN

which ministry, how much received in terms of development. [Referring to a copy of the document] For example, the Prime Minister's Department, RM5.7 billion. Treasury, RM3.3 billion, these are the high figures I mentioned. KKDW, RM7.8 billion. Transport, RM5.3 billion. PETRA, RM4.9 billion. Ministry of Health, RM6.7 billion, Ministry of Digital, RM7.5 billion, but our ministry RM9.7 billion. So, the highest. Nevertheless, it is still not enough. It is still not enough to meet all demands, especially in terms of maintenance. I— several YBs mentioned the maintenance of roads. In 2021, we received RM1.6 billion, 2022, RM1.17 billion, 2023, increased to RM1.71 billion, 2024, increased to RM2.39 billion, 2025, RM2.99 billion, 2026, RM2.68 billion, 2027, RM2.59 billion. So Honourable Members, when we mention resurfacing, about roads that have not been fully resurfaced, this is among the reasons, because our need is RM5 to RM6 billion. The money we obtain is only RM2.6 billion this year and next year RM2.59 billion. So, Honourable Members want to blame whom, when the money applied for is not enough? It is not that we did not apply, we applied for RM5 billion to RM6 billion, we got RM2.5 billion. Only half of what was applied for. That is it. I am not here to blame anyone, but it is important for the Ministry of Finance and the Ministry of Economy to look at the overall picture regarding a budget that is very important for the people, especially road maintenance. Cameron Highlands, Langkawi, Arau asked about projects that were postponed, cancelled, SST relating to rural areas. Rural projects...

Datuk Dr. Radzi JidinBERSATU · PNPutrajaya

Yang Berhormat...

What is the total cost?

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Before changing the topic...

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

The maintenance just now. Thank you, Honourable Member. As I said just now, if we look, yes, I agree about the financial constraints. But at the same time, the story that after resurfacing, this surfacing and this resurfacing method that is not durable, is there not an approach that is much— much better, more high-tech in this context? I have been informed JKR has actually tried it in several places and some showed good results and lasted longer. So, we can

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

save a bit of allocation every year compared with resurfacing after resurfacing. Please, Honourable Member, explain. Thank you.

Yes, we have create in Alor Gajah which conducts all the research on paving materials. Among them, paving materials from crumb rubber, from cup lump rubber, plastic waste by PETRONAS. Everything already exists. Only, it remains to be implemented. Still, when we want to implement it, in terms of cost, when those materials have not yet been used much, the cost is rather high compared with ordinary paving. That is another constraint. However, if we have sufficient allocation, all these matters can be resolved. Back to Cameron Highlands. Cameron Highlands, yes...

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

Honourable Member, before your closing, Honourable Member. Regarding paving as well.

Tuan Mohd Kurniawan Naim bin MoktarUMNO · BNKinabatanganEN

Yes. What methods does the ministry use to monitor these potholes? The situation is really unsatisfactory. First. Second, what is the KPI in the ministry once each complaint is lodged? Sometimes, even though we as Members of Parliament lodge complaints, one month or two months pass and action still has not been taken. So, I seek clarification from the Honourable Member.

In terms of KPI, for potholes on Federal Roads, they must be patched within 24 hours. I have told them why 24 hours, why not 12 hours. This is being processed for Federal Roads if there are potholes. However, for other roads, there are 11 types of roads, Honourable Member for Kinabatangan. Federal Roads are one of the 11. So, the other types of roads are implemented by other ministries. Nevertheless, we have a No Wrong Door Policy. If it is submitted to the MYJalan application, we also send it to the other ministries. As for me, since the Honourable Member for Cameron Highlands is here, Dato' Speaker, he has done something different today. That's alright. Regarding what the Honourable Member for Cameron Highlands mentioned, namely the Sinderut Road at RM320 million, Pos Lenjang, Pos

Titom at RM90 million. I want to inform the Honourable Member for Cameron Highlands that I have been to this Sinderut Road. I reckon, among the many roads I have visited, Sinderut Road is the worst road in the whole of Malaysia. However, the road's implementation had to be postponed. We received three letters on these postponements: a KKDW letter dated 20 July; a MOF letter dated 10 September; and a KKDW letter dated 17 September forwarding the MOF's directive letter. Therefore, as the implementing ministry, we have 27 other user ministries. Most of their projects, except for the PETRA and JPS projects, are mostly implemented by JKR. As the implementing ministry, we had to take several steps to ensure this matter was not delayed for long, because there are seven projects that have been completed, LP, yet have not been implemented. LP, that is Lembaga Perolehan (Procurement Board). Those that have been tendered still have not been implemented. There are seven stages of evaluation; pre-qualification of tenders has 13. All of these are involved in the postponement directive. The design stage has 29, and four tender documents have been completed; the total is 53 projects. The rural road projects involved in the postponement directive include two roads mentioned by the Honourable Member for Cameron, both included in the postponement directive. RM4.3 billion is the total for these 53 projects. The Honourable Member mentioned which areas the projects are in. Among them are Sungai Petani, Langkawi, Bagan Datuk, Mersing, Tumpat, Gua Musang, Kuala Krai, Rompin, Cameron Highlands, Jerai, Sungai Besar, Jempol, Masjid Tanah, Jasin, Ledang, Kulai, Port Dickson, Bachok, Pasir Puteh, Paya Besar, Jerantut, Bera, Pokok Sena, Kuala Langat, Kuala Pilah. Kuala Pilah has two. Kuala Krai, Masjid Tanah has another one, Pasir Puteh, Dungun. Dungun has two. Bera had two earlier, Alor Gajah, Kepala Batas, Gerik, Bagan Datuk again, Pokok Sena, Kuala Krai, Jeli, Masjid Tanah again, Maran, Lipis, Bera again, Hulu Selangor, Kuala Selangor, Kuala Terengganu, Jempol. Those are some of them. Honourable Members will know, when I mention them, whether they are in which group, over there or over here. Why did this happen? We also have not been able to pay contractors' debts since September, amounting to RM75 million. Why did this happen? I have been at the Ministry of Finance three times. First, as Senior Private Secretary to the Deputy Minister of Finance. Second, Deputy Minister of Finance 1.0, Deputy Minister of Finance 2.0. Three times indeed. So, I understand it a bit.

The problem is commitments. For example, a commitment of RM4 billion, but only RM2.6 billion was approved. Who approved it? The Ministry of Finance, of course. For example, there are 415 projects in KKDW. 201 under construction, 126 pre-implementation, 78 completed projects, 24 new projects. 391 out of the 415 are continuations. If continuation projects are not approved in full, then what has happened will happen. For example, 2027 applications for RM6 billion, but only RM2.28 billion was approved. So, how do we solve this problem? Therefore, in my view, MOF should not approve based on ceilings; rather, MOF should approve based on the actual cost applied for. This can be discussed further on how we improve it, because these 415 projects are the needs of rural people that have been approved since five years ago, RMK12 continued into RMK13. I think that is among the reasons for the controversy, the applications were not approved. Only part of the applications were approved, whereas continuation projects must be approved because the projects are already underway. Therefore, I hope this matter can be corrected by the Ministry of Finance, yes. Like Sinderut Road and Pos Lenjang, I think for anyone who has been to that place, it is very tragic if this is postponed. What will happen after this? It simply depends on allocations. That is the directive from the Ministry of Finance. On 11 November, meetings between KSP and also a meeting with KE (Ministry of Economy), a meeting with the Ministry of Works, a meeting with KKDW, the decision was that it simply depends on allocations. So if there is no allocation, or it is not enough, then it is postponed indefinitely. We also do not know what will happen. Therefore, securing finance is the main matter for the Ministry of Works as the implementing ministry. We are waiting on the ministry, especially KKDW, to pay all commitments, especially continuation projects. It is important to talk about the role of continuation projects so that we do not make mistakes. Batang Lupar and Putrajaya, yes, asked about MYJalan, the MYJalan application. As I want to state here, there are 73,926 complaints, and of these, road markings, obstructions, potholes, these are complaints. Damaged roads, public facilities, traffic lights, street lights, signboards, road furniture, landslides. I would like to inform you here that from August 2023 to October 2026, out of the total, those under the Ministry of Works, namely Federal Roads, highways and state roads, total complaints 23,639 or 31.98 per cent

of public complaints, under investigation 751 or 3.12 per cent, and completed 22,888, 96.82 per cent. This is a very good achievement regarding complaint resolution. As for other ministries, this is what we hope other ministries will do regarding town roads, village roads, agricultural roads, Sarawak state roads, Sabah state roads, private roads, there are 50,287 complaints or 68.02 per cent. For this, I have directed the ministries to promptly obtain feedback on the extent to which the 50,287 complaints have been completed and action taken by the relevant ministries. Then Kudat, Kinabatangan, Tenom, Beaufort...

Datuk Dr. Radzi JidinBERSATU · PNPutrajaya

Yang Berhormat.

...Tuaran...

Datuk Dr. Radzi JidinBERSATU · PNPutrajaya

Yang Berhormat.

...Kudat...

Datuk Dr. Radzi JidinBERSATU · PNPutrajaya

Boleh sikit?

...Kinabatangan, Tenom, Beaufort, Tuaran.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Before changing the topic.

Putrajaya already stood up earlier.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

No— MYJalan earlier.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

The Honourable Member mentioned MYJalan earlier.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

I am explaining MYJalan in the context of the compensation just now. When roads have potholes, uneven surfaces, cars have accidents and so on, and some people are injured. But now this compensation seems to have to be claimed from the company that maintains the road or the concessionaire. So if it is like this, each party can wash their hands of it. Therefore, we need to place this responsibility on the concessionaire and maintenance company so that they are more responsible and ensure every job is done well. So, my earlier suggestion is for the government to consider whether the existing apps, namely MYJalan as mentioned earlier, can be used to enable users to apply or make claims relating to compensation just now. Thank you, Honourable Member.

Thank you. There are people who have had accidents and received compensation, but yes, they must go to court first and so on, then the court decides how much compensation must be given by the concessionaire of the road concerned. But users must take the initiative to apply for this compensation. Okay, regarding the Pan Borneo Highway Sabah. I have mentioned earlier Tuaran, Beaufort, Tenom, Kinabatangan, Kudat. It is like this— Package 1A, 15 work packages. That is where the problem is. We, myself and the Minister, inherited this problem. But under us, Package 1B, Phase 1B, 19 work packages, has no problem. So, Honourable Members, especially in Sabah, must differentiate between the 15 Package 1A and the 19 Package 1B. However, Package 1B only started at the end of 2024, now it is 2026. We ensure there is no problem because this is our responsibility. But we also took on responsibility for the 15 work packages of Phase 1A from before, four have been completed and I have announced nine will be completed at the end of the year. For the latest data, six will be completed at the end of the year and three more will be completed in mid-2027. So, nine plus four, 13. Meaning that 13 are not completed, there are two packages. So, six packages expected to be completed by the end of this year are Beaufort–Bongawan, Bongawan–Papar, Inanam–Sepanggar, Sepanggar–Bulatan Berungis, Pituru–Rampayan Laut, Moyog–Sapi–Nangoh. So, this is Phase 1A. Phase 1B, as I mentioned, 2024, everything is orderly. Issues and obstacles, changes in the project implementation method from PDP to conventional.

...Among the causes, as I mentioned earlier, the issues of land acquisition are also common, utility relocation too, and the performance of these contractors are also among the reasons for Package 1A. Please, Tuaran.

Yes, Honourable Member. Package 8, from Bulatan Berungis to Tebobon, is among the most active alignments, meaning it is congested every day. From Kota Kinabalu, from Tuaran, it is congested morning and evening. And when we see the construction works, it seems there is no work, even the grass has grown and so on. So, I want to know what actually, when it was mentioned earlier that this is among the packages that will be completed. What actually caused those works to be so slow and delayed all this time?

And my earlier question about the accidents is true, because who knows how many there have been. Many lives have been taken by accidents on that road. So, still not finished.

Yes, accident data is not in my hands right now, we will answer later. Tuaran, yes, Sepanggar–Bulatan Berungis. So, earlier there were also Honourable Members who raised, especially Sipitang for example, how contractors should maintain existing roads properly. If contractors do not maintain existing roads properly, then we can appoint another contractor to maintain the road. And they must also cut the grass, look after the drains and so on. If they do not carry out those things, then it is an offence. We take action, we do not stay silent. We have had the Special Projects Task Force Steering Committee Meeting (Task Force) since 2024. Every month, meetings without fail. The Secretary-General of KKR himself, not the Deputy Secretary-General but the Secretary-General himself, together with the Sabah Permanent Secretary. The Chief Minister also asked for the Sabah State Secretary to attend and co-chair the meeting. So, we are taking proactive action. Ground visits many times by me, by the Deputy Minister, by the Minister, yes, and the Secretary-General. We also hold KKR strategic collaboration programmes, JKR Malaysia, JKR Sabah. Then bilateral discussions with top management of utility companies. Next, we applied to the Ministry of Finance so that the valuation firms, of which there are only eight in Sabah, can use licensed valuers for land acquisition, and this has been agreed. Apart from that, we have also taken action by ensuring all officers involved receive special course training so they fully understand how to arrange everything. Okay, Besut. East Coast Highway Phase 3. We have mentioned that LPT3 from Kampung Gemuroh, Terengganu, ending at Tunjong, Kelantan, 122 kilometres. This LPT3 is by privatisation. If Besut does not agree, well, compare it with what happened in Penang. Hybrid, yes, for the JD highway, Juru–Sungai Dua. JSD, Juru–Sungai Dua, and also several billion for the LRT from the island to cross over. Many billions.

If Besut does not really agree with that, well, Besut. Let us look at the positive aspects from another angle. We are trying to resolve KBKK, Kota Bharu–Kuala Krai, as well as Kuala Krai–Gua Musang and then Gua Musang for what is called the Primary Central Ring (LTU). However, the ECRL will certainly help starting 12 December from Tunjong via Kota Bharu, through Terengganu, Pahang and up to Gombak. On 12 December the ECRL will start. It will certainly help a little. However, LPT3 is not cancelled. LPT3 has a project need, a statement of needs has been submitted to UKAS JPM that there is indeed a need to prepare the RFP (request for proposal) document and we are still at the stage of preparing the RFP document by UKAS JPM. That is the current status. This answer is standard, what I want to state is that we hope UKAS JPM will complete it quickly and send it to the Cabinet Meeting.

[Bangun]

Arau, this matter— he is not here, but we will answer in writing regarding government procurement methods, yes. Next there is...

Minister, Temerloh, is there Temerloh?

Datuk Haji Awang bin HashimPAS · PNPendangEN

Honourable Member, Pendang has raised it.

Banyak lagi.

Hah.

If not, we will answer in writing.

Dato’ Pengerusi.

Some has already been completed.

Datuk Haji Awang bin HashimPAS · PNPendangEN

Dato' Chairman, a little request.

Pendang was not debating earlier.

Datuk Haji Awang bin HashimPAS · PNPendangEN

Wanted to debate but...

Not enough time?

Datuk Haji Awang bin HashimPAS · PNPendangEN

Not enough time, first.

Datuk Haji Awang bin HashimPAS · PNPendangEN

Second, it is already full.

Erm. The schedule is already full?

Datuk Haji Awang bin HashimPAS · PNPendangEN

...Which was given by the House. Okay, I want to ask one thing because of this infrastructure.

Just a little, just a little, Honourable Member.

Datuk Haji Awang bin HashimPAS · PNPendangEN

031000 has many projects, including in my area, that have to— cannot be completed. So, can the Honourable Member prepare a percentage, like the percentage of these abandoned projects, just like the percentage provided regarding the Melaka Election, I congratulate those who got more than two-thirds. So I want this percentage as a— as can be prepared, like that Melaka percentage. The Melaka election results were very impressive. So, meaning the projects that are ongoing must also prepare their percentage completed, 10 per cent, 20 per cent, and also claims, claims based on the schedule that has been prepared.

Datuk Haji Awang bin HashimPAS · PNPendangEN

Thank you. Congratulations once again.

In other words, to ask about sick projects, how is it in percentage terms? This is in percentage.

Ya, ya.

Rantau Panjang also asked earlier, so I will answer them together.

Based on the monitoring by the Public Works Department...

Datuk Haji Awang bin HashimPAS · PNPendangEN

The bridge in Pendang. Two.

Based on our monitoring, there are 880 projects under construction. That is a lot, yes. But out of that total, only 38 projects, or 4.32 per cent, are categorised as sick projects, and I chair these sick projects. 2026, 6.51 per cent, 55 projects, the latest— I mentioned 4.32 per cent earlier but it had dropped in September 2026 to 3.77 per cent, 33 projects. It rose slightly to 4.32 per cent in October 2026, 38 projects.

Tomorrow evening I will be going to Sarawak. Not to campaign, because BN and GPS no longer have any direct campaign connection. Indirectly, we pray for them. What I intend to do in Kuching, Sarawak, is to chair the troubled projects meeting. To ensure the projects are addressed one by one. These 38 projects will be opened one by one by file, and we will see how to resolve them. But do not forget, of the total 880 projects, only 38 are troubled. We would prefer to have zero troubled projects, but there are factors beyond our control, so the troubled projects cannot be brought to zero for now.

Langkawi. Salt water is one of the contributing factors to road surface damage. Of course, he is on an island. There is currently no study establishing a specific technology related to salt water. The frequency of road damage in coastal environments and on ordinary roads needs to be studied before confirming that the salt water factor is significant in road maintenance aspects. CREaTE will always carry this out.

Langkawi and also Kuantan, cost savings achieved through the innovations of CREaTE, namely the Centre of Excellence for Engineering and Technology (JKR). Earlier, someone from Putrajaya also asked. So, I would like to mention that this road surface mixture includes, among others, polymers, coagulated rubber, crump rubber, fibres, and recycled plastic as asphalt reinforcers to address extreme rain and flooding. The high-performance bitumen formulation as well as this porous and moisture-resistant surfacing are designed to prevent water infiltration, improve aggregate adhesion, and avoid potholes caused by wet-dry cycles. So, we constantly carry out this work, and some of its products have already been implemented.

This is another special matter today, namely regarding TuJu. Klang, Rasah, and Bentong asked about TuJu. So, I would like to make a statement here regarding TuJu. The TuJu application was originally developed as a platform for delivering real-time traffic information on tolled highways only (real-time). This is to help highway users plan their journeys better. The application was officially launched on 26 November 2025, with navigation functions introduced as an added value to existing services. The TuJu application was developed by Prosignal Consortium Sdn. Bhd. under a joint venture agreement with the Malaysian Highway Authority (LLM), signed on 20 January 2023. The development of this application did not

involve any use of public funds. There is no public money for the TuJu application. For the information of Honourable Members, and there is also no financial allocation from the LLM Government. The entire cost of development, operation, and maintenance of this application is the responsibility of Prosignal Consortium Sdn. Bhd., without any government allocation. That— previously, the Honourable Member for Bagan also mentioned this matter. Following the directive prohibiting government officers from using the Waze application for official business on cyber security considerations, as well as the encouragement to use local alternative navigation applications. The TuJu application has recorded a very significant increase in the number of users in a short period. The number of users who had downloaded the TuJu application increased sharply from around 200,000 in seven months to 800,000 and more than 1 million users within a few days. Therefore, this sudden increase has placed pressure on the capacity of the existing system, consequently causing technical disruptions, particularly to the navigation function of the application. The sudden increase in users caused the subscription charges by the navigation map service provider to exceed the payment limit, so that Prosignal had to pay RM300,000 in one day, for example. Following that, the LLM, together with PCSB, Prosignal, carried out recovery and improvement measures for the TuJu application. The LLM has also coordinated discussions with related agencies such as the National Cyber Security Agency (NACSA), the Ministry of Digital, the National Digital Department, and GovTech Malaysia for system improvements. Starting 6 November 2026, the TuJu application has operated using a linked navigation function, with a direct hyperlink to Google Maps as an alternative measure in line with the optimisation of system operating costs. Earlier, I had my officer show me how to get home to my kampung in Benut, Pontian, Johor, and there was a hyperlink directly using this TuJu application, and the TuJu application is one of the special features because it has location search for Rehat dan Rawat areas, emergency assistance, live CCTV views, real-time traffic information, and also in case of any emergency. The implementation of the key solution actions and services of the TuJu application is available and can be fully accessed by all users of iOS or Android devices.

Datuk Dr. Radzi JidinBERSATU · PNPutrajaya

Yang Berhormat.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Since Yang Berhormat spoke about tolls earlier, I wanted to ask about multi-lane free flow, the barrier-free toll system. What is the latest update regarding this barrier-free toll system? Thank you, Yang Berhormat.

Yes. My time is up. Hulu Langat and Putrajaya. We have decided on MLFF. It will use business to business. The government will not release any funds. Therefore, any efforts by them, those who manage it and the systems, including the one developed by the PLUS system, they have built the system and there have already been trials in several places. When full preparations are made, then the preparations will be implemented and can be carried out. Nevertheless, certain acts need to be amended in this House. Among them, if they do not pay the toll, what can we pursue against those who do not pay the toll when there are no barriers? Surely there will be those who try to evade the toll. So, that act needs to be amended and I hope it can be expedited. Regarding Hulu Langat, the highway toll abolition, then another Honourable Member stood up, Bestari Perdana Toll, can it be abolished or not? We did not promise to abolish this toll. [Applause] We also did not promise to abolish PTPTN. We also did not promise to give EPF to housewives. We did not promise, yes. We, that is me. My party, that is my party. [Laughter] We did not promise to do those things. We did not promise to reduce petrol by RM1.50. We did not promise. So, whoever made those promises must answer. But I asked the officers, can we abolish these tolls or not? There are 28 toll concessions, 34 toll highways because some concessions cover more than one. In Malaysia there are 34 toll highways, 28 concessions. An officer gave me one, and I said, "Dato’, you have calculated roughly?" I said, "Roughly how much?" If PTPTN is to be abolished, the government would need to pay RM70 billion. But if tolls are to be abolished, RM400 billion would be needed, Dato’. Does the government have RM400 billion to take over all 34 toll highways? Me, yes, this RM400 billion is roughly the annual budget, ladies and gentlemen.

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Honourable Minister.

Honourable Members...

Tuan Wan Razali bin Wan NorPAS · PNKuantanEN

Regarding this toll matter just now, it is difficult to abolish, but in Bentong, to go up to Genting Highlands, we already have to pay a toll now. Thank you.

That is a private road. The highway in Genting Highlands is a private road. They obtained special approval. They built that road themselves to go up there.

Dato’ Ngeh Koo HamDAP · PHBeruas

[Bangun]

But because the development on that road is used not only by the related company but by other companies, with various apartments and various hotels built by other companies. Therefore, a private toll is imposed.

[Bangun]

But by other companies, various apartments and various hotels built by other companies, therefore a private toll is imposed. They collect it, why? They want to maintain that road, otherwise the road will be damaged, and the government does not maintain private roads.

Yang Berhormat, just a little.

Yes? Kuala Krai.

The Honourable Member mentioned earlier that abolishing tolls requires RM400 billion. In the near term, is the Honourable Member aware that there are several toll locations that become bottlenecks because the roads cannot accommodate the entry of cars. So, in the near term, can more toll plazas be opened, expanded, and increased, for example in Gombak, Bentong, and Sungai Besi. These are examples causing severe traffic jams in these areas. Thank you, Honourable Member.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Minister, five minutes.

After I answer this, I will be finished.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Lima minit.

Terima kasih.

Dato' Ngeh Koo HamDAP · PHBeruasEN

May I ask one question about tolls?

I am a hardcore highway user, because I go back to my area every week. I take the PLUS highway southbound, enter the toll, pay the toll, Simpang Renggam toll or Sedenak toll to reach the town of Pontian. Every week I go back, pass through PLUS, then pass through the Sungai Besi toll, so I understand what the Honourable Member for Kuala Krai means, and sometimes I go to various places across Malaysia and understand what is happening. We hope MLFF (multi lane fast flow) is not free flow. If it is free, they will not pay, so multi lane fast flow, Putrajaya, not free flow, can be implemented as quickly as possible by all toll concessions under the B-2-B (business to business) arrangement between the relevant parties. So, that RM400 billion is the Honourable Member's estimate, an estimate. I am also not sure of the actual amount, but that is the answer the officer gave me. If it is RM400 billion, we do not have an annual budget for that. If it is RM70 billion, there is no budget for PTPTN, no annual development budget. If it is RM400 billion, there is no annual management budget. That means, if we do not want to pay the salaries of government officers, government staff, 1.61 million people a year, then we may as well take over the tolls.

Dato' Ngeh Koo HamDAP · PHBeruasEN

Minister, we are not asking for all tolls to be cancelled. What has happened— after 2018, on the North-South Highway, we already reduced tolls by 30 percent. So, our hope is to do it gradually. Let us abolish tolls. Can it be done?

I heard that at the time, yes.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Minister, a little more.

Especially Tony Pua, who did the calculations, standing at the MEX toll and so on, then made certain conclusions. That is, abolishing these tolls was indeed a promise, and we did not promise. But at some point, at some time, I do not know when. Yes?

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

Be brief, Minister. The Minister said just now that RM400 billion would be used to abolish tolls. Is that correct?

Anggaran. Anggaran.

Dato’ Rosol bin WahidBERSATU · PNHulu TerengganuEN

My question is, were the promises made merely to win elections, and they were unable to implement them? What is the Minister's view?

There are many more promises.. [Interjection]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat, two more minutes.

Yes. There are many more unfulfilled promises. I have a pantun about that, yes. Do you want to hear it or not? If you go fishing, Do not forget to bring bait; If you do not want to be pissed on, Support Barisan and Perikatan. Ah, just like that, yes. [Applause] So, enough just... [Interjection]

Speaker. Speaker.

Terima kasih.

Speaker, I would like to seek clarification.

Is the Deputy Minister answering as the Deputy Minister of the Unity Government or as the UMNO leader here?

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat, ask the Minister.

Menteri. Menteri.

Yes, I asked.

There is no answer.

Takkan kita nak duduk di sini dengar kepada rentetan seperti ini? Don’t insult us in the House. You are here as unity government Deputy Minister.

It has nothing to do with the budget.

Answer as the Deputy Minister of the Unity Government.

Satu sahaja.

Do not embarrass yourself.

Do not engage in politics in... [Microphone switched off]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat. Yang Berhormat, debate, don't get it out of our hand, yes. Be factual and answer next.

[Inaudible] Standing order.

Minister. One, regarding...

I ask the Deputy— I am using the standing order.

Affected by this flooding, the proposed projects.

I ask the Deputy Minister...

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Wait. Wait, Honourable Member for Jelutong. A point of order?

Yes. With permission, Deputy Speaker, you are the right man to make a ruling because you are always impartial. "It is an offence for Members of the House to use impolite language." Just now we heard the Deputy Minister make a jibe at the leaders of Pakatan Harapan— Members of Parliament from Pakatan Harapan. We are in the Unity Government. Indeed these matters were promised, but he is here, giving explanations as the Deputy Minister of Works of the Unity Government. [Applause]

This is backbenchers insulting the government even more badly.

You sit down when I am talking.

You backbenchers... [Microphone switched off]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat. In the House, if this continues like this, I will ask both of you, yes. Wait, let me finish speaking, Honourable Member for Jelutong. Get to the point and let the Minister, with permission, answer.

Deputy Speaker. Our government is the Unity Government. There are Members of Parliament from Pakatan Harapan here to support from the Committee stage. Do not let the Deputy Minister here issue statements that taunt us.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Baik.

As if he is colluding with that side, Deputy Speaker.

Yang Berhormat. Yang Berhormat.

Kenyataan jahat.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat. Yang Berhormat Jelutong, I get the point. I got what...

Deputy Speaker, last point for you to make a valid ruling. I ask him to withdraw the statement "kencing" and apologise to the Members of Parliament from Pakatan Harapan here.

Who was pissing? He did not say.

An impolite statement.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yes, Honourable Member.

Kencing. Who is kencing? Who likes kencing?

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat. Alright. Yang Berhormat has raised Standing Order 36...

Shame on you. [Berucap tanpa menggunakan pembesar suara]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat. In the House.

[Dewan riuh]

Shame on Jelutong. [Speaking without microphone]

Shameful. [Speaking without microphone]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat- Yang Berhormat.

Backbenchers, shame on you. [Berucap tanpa menggunakan pembesar suara]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

We are Members of Parliament, we are being watched, right. Alright. Honourable Minister, please withdraw the "kencing" part. That is my advice.

Oh, what is it, Speaker?

[Dewan ketawa]

I may have got carried away because of two days ago.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat, the Honourable Member for Jelutong has raised... [Interjection]

But I did not mention Pakatan Harapan, because the first version of my pantun had the words Pakatan Harapan... [Interjection]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Yang Berhormat.

I have removed the words Pakatan Harapan.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Yang Berhormat.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Let me speak.

Okey. Okey.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Others please be quiet. Yang Berhormat, my ruling is that the "kencing" part must be withdrawn now— wait, I have not finished yet. I have not finished. Yang Berhormat, the "kencing" part has nothing to do with anyone. However, it is— in my consideration, it is unparliamentary. Withdraw that part.

I like pantun. So, in the whole pantun, there is apparently no word "kencing". Thank you. Whatever I did not answer....

[Dewan riuh]

Minister, the projects— proposals, I mentioned earlier, five proposed projects affected by the flood.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Yang Berhormat.

Deputy Speaker, ask him to withdraw it.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Yang Berhormat. Honourable Member for Besut, sit down. I do not allow it. Time is up. Yang Berhormat, please proceed.

Yes, I, yes, just "kencing" then, yes.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

The intention is important.

Nawaitu. Nawaitu.

[Dewan riuh]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Whether to— wait, others be quiet.

"Kencing" withdraw. The "kencing" the Speaker said to withdraw. "Kencing" withdraw. Okay.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Tolong gulung.

I have many officers behind me. I hope that whatever I did not answer will be answered in writing. I hope my officers will review all the speeches. I have written up to the 28th Putrajaya, a long list written here. Line by line, Yang Berhormat Speaker. Because sometimes Honourable Members propose three matters in five minutes, but I answer only one matter. It is not that when I have mentioned Bentong, the word Bentong, then Bentong must be left out, not answered. I want to inform my officers, if there are three matters that Bentong raised, answer all three matters in writing. That is the latest directive of the Ministry of Works, from me as Deputy Minister, so that all Members of Parliament, from whichever side, are satisfied with the answers and that the matter is not raised again in further debates. Thank you, Yang Berhormat Speaker. [Applause]

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Alright, Yang Berhormat. At last, haih, really heavy.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Alright, Honourable Members, the House hereby brings forward the question, namely the sum of

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

RM1,146,184,500 for Head B.27 Operating Expenditure Estimates 2027 to be made part of the Schedule shall be agreed to. [The question was put and agreed to] [Head B.27 ordered to be part of the Schedule]

Mr ChairmanEN

Yang Berhormat-Yang Berhormat hold your horses, with permission. The question is that the expenditure mentioned in Head P.27 in the Development Expenditure Estimates 2027 shall be approved. [The question was put and agreed to] [Head P.27 approved as part of the Estimates of Expenditure]

Bill — Supply Bill 2027 and Development Estimates Motion 2027 Committee — Head B.28 [Schedule] – Head P.28 [Development Estimates 2027] –Bill

Mr ChairmanEN

Alright, Yang Berhormat. The House goes to the Ministry of Transport. Supply Head B.28 and Development Head P.28 under the Ministry of Transport are open for debate. There are 21 Honourable Members who will debate, and the list is as follows. Starting with the Honourable Member for Bagan Serai, followed by the Honourable Member for Bakri, the Honourable Member for Jerantut, the Honourable Member for Tenggara, the Honourable Member for Setiu, the Honourable Member for Tebrau, the Honourable Member for Padang Rengas, the Honourable Member for Tuaran, the Honourable Member for Alor Setar, the Honourable Member for Putatan, the Honourable Member for Labuan, the Honourable Member for Keningau, the Honourable Member for Ipoh Timur, the Honourable Member for Merbok, the Honourable Member for Shah Alam, the Honourable Member for Mersing, the Honourable Member for Tenom, the Honourable Member for Kuala Kedah, the Honourable Member for Jelutong, the Honourable Member for Putrajaya, the Honourable Member for Penampang. I now invite the Honourable Member for Bagan Serai. I understand the Honourable Member for Bagan Serai. I understand your area is severely flooded, so I will allow you to leave first. Please proceed, Honourable Member for Bagan Serai.

Datuk Haji Idris bin Haji AhmadPAS · PNBagan SeraiEN

Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. Thank you to Dato' Sri Chairman. Item two-six-zero-ten-one-hundred, governance of management

Datuk Haji Idris bin Haji AhmadPAS · PNBagan SeraiEN

...the ministry. This concerns the integrity of government revenue collection management involving the MyEG and Zetrix cases. The news that the Ministry of Transport (Kementerian Pengangkutan, MOT) suspended the services of MyEG and Zetrix is very distressing to us, because MyEG is an agent of the Road Transport Department (Jabatan Pengangkutan Jalan, JPJ) collector, whose task is to collect motor vehicle licence renewals, driving licence renewals, vehicle ownership transfers and also summons payments. The problem is that MyEG's services have not paid the government for nearly five months, amounting to RM314 million. Yet according to the rules on public financial management, as directed by the Treasury and also the Malaysian Treasury Circulars (Pekeliling Perbendaharaan Malaysia), money collected must be transferred into the Treasury's official government account by the next day at the latest. For example, if collected on Monday, it must already be deposited into the official account by Tuesday, under the T+1 method of the transaction day of collection. What is most worrying is that this company also once handed over a bouncing cheque, as people call it, of RM231 million as settlement of arrears from these collections. Suddenly this cheque could not be cleared, after the company instructed the bank not to clear it because perhaps there was no money. This is not an ordinary case, Dato' Chairman. I have been informed that although JPJ has terminated its contract on 5 October 2026, and police reports have also been lodged for civil summons claims against this company. And I want further explanation on this RM314 million case. First, how much of this RM314 million has been successfully recovered? Has it been handed over, or are there still arrears? If there are arrears, what penalty has been imposed on this company? Second, what is the status of the legal action taken, because this is to secure the government's money that must be fully repaid? Third, is the ministry prepared to ensure that all government revenue collection agents from now on use a direct transfer mechanism to the government account once they have collected the money, so that this case does not recur. We cannot pay summonses even one day or two days late, and we cannot renew road tax. They were nearly five months behind, involving such a huge sum of RM314 million, and it suddenly just happened. This is greatly regrettable to us in terms of governance.

Datuk Haji Idris bin Haji AhmadPAS · PNBagan SeraiEN

B.26 Item 020100 – Land Public Transport Agency (Agensi Pengangkutan Awam Darat, APAD). The welfare of the e-hailing and p-hailing sector involves nearly 600,000 people who work in this sector. The question is, does it truly give justice to the workers? This is because e-hailing drivers bear their own operating costs. Their insurance, their fuel, their maintenance, insurance and also tolls, their instalments, the depreciation of their vehicles. Sometimes they wait without any calls. On the other hand, the platforms that operate these e-hailing services are the ones that determine the fare structure. They are the ones who determine the commission rate. They are the ones who determine the allocation of bookings. They are the ones who distribute incentives, and they are also the ones who conduct performance evaluations of these drivers. That is why we sometimes worry that those involved in e-hailing do not get the justice they should. Nevertheless, our measure of fairness is not based on the commission rate alone, because the important question is how much net income is received by those working in this sector. How much do they bring home after deducting operating costs and their working hours? Recently we saw in the budget that there is RM160 million for a package with Grab in the budget just approved. My question is why — how much is Grab's contribution in this package? Why was only Grab chosen when there are also Foodpanda, ShopeeFood and inDrive that were not included in this package? So, how does the government hope that discrimination will not occur against workers who work on platforms other than Grab? We do not want income rates to rise with the RM160 million incentive, while at the same time commission deductions and service charges increase when their income is not very high. And does the government require platform companies to disclose the commission structure, deductions and fare calculations imposed on these e-hailing workers? Thank you, Dato' Chairman.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Bagan Serai. The Honourable Bakri is invited to speak.

Tuan Tan Hong PinDAP · PHBakriEN

Thank you, Dato' Sri Chairman. I refer to Item 020300 – Road Transport. I want to raise an issue regarding the road tax for diesel vehicles. For the period of 12 to 18 November just past, unsubsidised diesel was priced at RM4.87 per litre, which is one Ringgit more expensive than RON95 at the unsubsidised price.

Tuan Tan Hong PinDAP · PHBakriEN

I want to remind this esteemed House that the 2009 Budget stated that the road tax for private diesel vehicles was once higher because the price of diesel was much lower, much cheaper than petrol. So, when the prices of both became closer, the government equalised the road tax rates for both types of vehicles with effect from 1 September 2008. Therefore, the latest changes in fuel prices should be taken into account in reviewing the rates today. On 25 April last year, the Prime Minister asked the Ministry of Transport to study a reduction in road tax for diesel vehicles. So I want to ask the Minister. The Minister is not here, never mind. There is a Deputy Minister. So, is this proposal still awaiting consideration by the National Economic Action Council (MTEN)? So, I hope the government can lower the road tax rate for diesel vehicles as quickly as possible, because the current tax rate no longer reflects the real situation in the market. Dato' Sri Chairman, I would like to share a small issue when I visited the JPJ Muar Branch the other day. I was stopped by a member of the public. He cursed at me, asking why the government would not give him the vehicle grant. He said it was as if a child was born but had no birth certificate. When I asked the JPJ branch, they said this was a problem where there was a shortage of stock for printing licences — what is it — licences — what is it, VOC, they called it — grants. Vehicle grants. The problem is, if there is no grant temporarily, that is fine. But when the individual brought the car to be checked, PUSPAKOM required him to show the vehicle grant. And he had to go back to JPJ. JPJ said they could not do anything. You can do a search and print the vehicle information temporarily, and it costs RM20. That is what made him angry. Coincidentally I was there, and he got angry at me. He said why the government could do this. You are the one who did not give the grant, but when I do a search I have to pay RM20.

Tuan Tan Hong PinDAP · PHBakriEN

So, I hope that in future, if such things happen, there must be a solution, there must be coordination between agencies. Do not let it be that agency A says it cannot be provided, and agency B says it is mandatory. And then in the end we are the ones who did not issue the grant, yet we want members of the public to pay for a search printout. This issue has been resolved, yes, after I discussed it with the branch head and so on. This issue is resolved. This morning, before I came in, when I was preparing this debate script, he texted me saying the issue was resolved. Now there is no need to pay. But in future, this must not happen again, because we are the ones who did not give the grant to the public. Therefore, when they do a search, the system should be able to waive the payment temporarily while we fulfil the stock of these papers. So this is not only for JPJ, yes, not only for the MOT ministry. It happens to be the MOT right now. I am sure other agencies are the same. But I want to remind you, do not — never make the public suffer. Never, because of our shortcomings, we act as if we are punishing the public, we want them to pay. So I hope we must have flexibility. We must be flexible and the system should allow us to amend or temporarily postpone that payment. Dato' Sri Chairman, Item 00200 – Strategic Transport Study. I request that the government start a feasibility study for the West Coast railway alignment in the state of Johor. Dato' Chairman, Muar, Batu Pahat and Pontian are the main towns driving economic growth on the West Coast of Johor, but these three districts, which have a million residents, do not have any other transport apart from... [Unclear] road. We are very envious when the twin track — the twin-track railway project — has been completed. The residents of Segamat, Kulai, Kluang and Johor Bahru are connected by railway. They have another alternative if they find road transport very congested. If they do not want to use the North–South Expressway, they have the option of using the train. But for the West Coast of Johor, we do not have that option. So, I want to take this opportunity to request that the government study and take the opportunity, while we are building this West Coast Expressway, to also plan and map out a railway alignment

Tuan Tan Hong PinDAP · PHBakriEN

for the West Coast of Johor, so that when the land acquisition process takes place, the construction of the railway is also taken into account, although I understand this project will not necessarily start in the immediate future. But it can be prepared earlier so that the land acquisition cost and the planning cost can be calculated simultaneously when we plan the alignment for the West Coast Expressway. And this will save a lot of allocation and save at least billions of Ringgit if we plan both modes of transport simultaneously. So, I hope the MOT takes this proposal seriously. Second, Item 01600 – Purchase of KTMB Rolling Stock.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, one minute.

Tuan Tan Hong PinDAP · PHBakriEN

I hope that KTM has made an announcement that, starting 1 January next year, the service from Johor Bahru to Padang Besar will have no direct route, no direct connection, yes. No direct service. I hope this decision is reconsidered and we restore, restore this service. And if there really is a problem, I hope there is flexibility, and we need to make use of, make use of technology, enabling passengers to buy tickets simultaneously and more flexibly so that passengers' journeys are not disrupted. I think this is important because our route is not long, only 700 kilometres. Surely a direct service cannot be unavailable. So, I hope this matter can be taken into account. I know the Minister is not here, but the Minister is not here because of a principle, not because he does not perform.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, 30 seconds.

Tuan Tan Hong PinDAP · PHBakriEN

I hope we do not belittle any party. We are the Unity Government. I was disappointed earlier when a Deputy Minister, while winding up, denigrated the parties in the Pakatan, in the Unity Government. I feel this should not have happened. Let us together ensure our government performs for the interest of the people.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Honourable Member, that's enough.

Tuan Tan Hong PinDAP · PHBakriEN

That concludes my speech, thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Alright, the Honourable Jerantut is now invited.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, and greetings of well-being. Thank you, Dato' Sri Chairman. I now turn to Item 00900 P.28 – Enhancing KTMB's Capabilities. We have been informed through the Keretapi Tanah Melayu Berhad Workers' Union (RUM) about the ministry-level proposal for the privatisation of the management and maintenance of the railway network. So the question from Jerantut is, what — I am sure, surely a life cycle costing has been implemented for this issue, involving four phases, namely capital cost, operating cost, maintenance cost and also end-of-life cost. However, can the ministry present this matter thoroughly at the level of the Parliamentary Select Committee on Infrastructure, Transport and Communications (IPK), so that we can convey it to this workers' union.

Surely they have a different angle because they have a feeling of job insecurity, Mr Chairman. They fear that if this happens, what guarantee does the government give, especially to the technical workers involved in this matter, in terms of their time-off, their overtime, their employment. Will they still be retained if this is implemented? And it must be remembered, Mr Chairman — Dato' Seri Chairman, KTMB was established in 1885. So surely there is much experience of KTMB and its workers who are capable of implementing this. But perhaps there is a technical assessment that led KTMB to take the approach of privatising this matter. So, I request a thorough answer from the ministry. Second, regarding ECRL. Under Item P.28 20000 – Rail Infrastructure Enhancement. I congratulate MRL for this project being implemented — the first phase has been successfully implemented and ahead of schedule, with your permission, Dato' Seri Chairman. And God willing, if there are no obstacles this Friday, the Parliamentary Select Committee on Infrastructure, Transport and Communications (IPK) will try the ECRL EMU train this Friday to Kota Bharu, from Gombak to Kota Bharu, God willing. Only, the question that worries me, Dato' Sri Chairman, is that we have been informed by MRL that the total cost of this project amounts to RM72 billion. So the question is, how will the repayment of the principal be paid by the MOT, which is scheduled to begin in 2027, next year? What business model and cash flow projections have been prepared by the government to ensure that loan repayment commitments can be met? And will the government rely entirely on passenger and cargo operating revenue, or a different business model so that this loan can be repaid on schedule? According to MRL, it is said this project will certainly have an economic multiplying impact — a multiplying effect. The question is whether this has been carefully arranged so that the government in future will not be burdened with this RM72 billion loan. Then, Chairman, regarding Zetrix. I think Bagan Serai has given details earlier. Only my question regarding Zetrix is, what administrative innovation will the government introduce to ensure this does not happen again? Under Item B.28 020100 – Land Public Transport Agency (Agensi Pengangkutan Awam Darat, APAD). I want to raise the issue of the increase in express bus fares following the adjustment of diesel subsidies. As raised in Utusan Malaysia on 30 September last, the fare increase of RM15 to RM20 per one-way trip is increasingly burdening consumers. So, the question, Dato' Sri Chairman, is why — why is the burden of the diesel subsidy adjustment being transferred to consumers through increased ticket prices? What is the government's mechanism to ensure bus fares remain reasonable, and must the people continue to face fare increases every time world oil prices are unstable? What is the APAD mechanism to ensure that fare increases are truly based on increases in operating costs, and not taking advantage of the diesel subsidy adjustment? And has APAD reviewed the breakdown of operating costs that the bus operator should submit before any fare increase is approved? The last issue, Dato' Sri Chairman, concerns air transport. We understand the geopolitical situation in the world that has caused

Transport and Communications (IPK), we will try the ECRL EMU train this Friday to Kota Bharu, from Gombak to Kota Bharu, God willing. However, the question that concerns me is, Dato' Sri Chairman, we have been informed by MRL that the total cost of this project amounts to RM72 billion. So the question is, how will the repayment of the principal be made by MOT, which is scheduled to begin in 2027, next year? What business model and also cash flow projections have been prepared by the government to ensure that the loan repayment commitments can be met? And will the government rely entirely on passenger and cargo operating revenue, or a different business model, so that this loan can be repaid on schedule? According to MRL, it is said that this project will certainly have an economic multiplying impact— multiplying effect. The question is, has this matter been carefully arranged so that the government in future will not be burdened with this RM72 billion loan or debt? Next, Chairman, regarding Zetrix. I think Bagan Serai has already gone into detail earlier. However, my question regarding Zetrix is, what administrative innovation will the government introduce to ensure that this matter is not repeated? Under Item B.28 020100 – Land Public Transport Agency (APAD). I would like to raise the issue of the increase in express bus fares following the adjustment of the diesel subsidy. As highlighted in Utusan Malaysia on 30 September, the fare increase of RM15 to RM20 for a single one-way trip is increasingly burdening consumers. So, the question, Dato' Sri Chairman, is why the— why the burden of the diesel subsidy adjustment must be transferred to consumers through an increase in ticket prices? What is the government's mechanism to ensure that bus fares remain reasonable, and must the people continue to face fare increases every time world oil prices are unstable? What is APAD's mechanism to ensure that fare increases are truly based on increases in operating costs and not taking advantage of the diesel subsidy adjustment? And has APAD reviewed the breakdown of operating costs that the bus operators should be required to submit before any fare increase is approved? The last issue, Dato' Sri Chairman, concerns air transport. We understand the geopolitical situation in the world that has caused

...uncertainty in world oil prices. Surely it will have a proportionate impact on air transport operators. Whether at government level under Malaysia Airlines or in the private sector. So, since Malaysia Airlines is under Khazanah, and Malaysia Airlines and also the private airlines, Dato' Sri Chairman, buy Jet-A1 fuel from PETRONAS, PETRONAS Dagangan, which is also chaired by the same person, or whose absolute power lies under the Prime Minister. So, is there not a new method or innovation that the government can implement to ensure there is a buffer, a cushion for this agency or this company to cover their costs? Because their OPEX, Dato' Sri Chairman, has increased many times over due to the rise in the price of Jet-A1 fuel. So, this has caused these airlines, whether under the government or in the private sector, to be forced to increase ticket prices, which will directly burden consumers. Lastly, to conclude, Dato' Sri Chairman, I— we also understand that the Dato' Minister of Transport has resigned on principle. Putting politics aside, I worked with him together in discussing transport issues, professionally and most importantly, able to discuss, agree to disagree and matter on the table-lah. So, I wish the former Minister of Transport every success. However, Dato' Sri Chairman, transport issues are day-to-day issues. They are important. So, that position should be filled as soon as possible. And in my view, the current Deputy Minister is also very competent, very technical. [Applause] And he— not that I want to praise him. He has also worked with us on transport issues before. So, why not promote him directly as Minister of Transport, given that he is also a representative of GPS, which is one of the main pillars of the MADANI Unity Government today? That is all, wassalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Dato' Sri Dr. Ramli bin Dato' Mohd Nor)EN

Thank you, Honourable Member. The Honourable Member for Tenggara is invited to speak.

Auzubillahiminashaitanirrajeem, Bismillahirrahmanirrahim. Thank you, Dato' Sri Dr. Speaker. From Tenggara there are only two matters. One, which has already been mentioned by

Bagan Serai. We want to highlight it further and explain it, and the other is related to e-ART. Tenggara refers to Item 010800 – Account, 010100 – General Management, 020300 – Road Transport, and 12100 – New Office/Building, Equipment and Computerisation of JPJ, which relates to the MyEG and Zetrix AI tax arrears scandal. This scandal is a massive slap in the face for Tenggara to the ministry. And what is saddening is that we only came to know about this matter because the newspaper or media from our neighbouring country exposed it in The Straits Times, Singapore, last October. And if it were not for this report, until today we might not have known the real facts. So, it seems the responsibility of safeguarding the people's money is not an easy one, and even outsiders, Singapore, had to tell us, and only then did MOT and JPJ hurriedly suspend the MyEG and Zetrix AI services on 5 October 2026. Based on the official statement of the Minister of Transport himself, the former Minister of Transport, the total amount of tax collection arrears from 19 May to 31 September 2026 reached RM314 million. And even more distressing, after 35 reminder notices had been issued, Honourable Dato' Sri Chairman, a post-dated cheque of RM231 million was handed over on 21 August with a maturity date of 30 September 2026, and the company instructed the bank to stop payment. This is a blatant insult to the government and the law. Dato' Sri Chairman, Tenggara wishes to raise several questions regarding MyEG. The first concerns the Accounts Division of the ministry. Regulations require collecting agents to transfer collections daily, but strangely, how was this division able to be negligent for more than four months? Allowing arrears to swell to RM314 million without automatic restrictions. The second is that previous international media reports alleged that there was a delivery failure issue since the three-year contract began in May 2023, 35 reminder notices, why did the T+1 compliance lapses occur? Were these repeated warnings not detected and blocked earlier by the Internal Audit Unit in the Ministry? And was there any special privilege given to this company? As the RM314 million scandal occurred in mid-2026, it has not yet been included in the latest Auditor General's Report. Tenggara urges the National Audit Department to conduct a special audit of MOT and JPJ without waiting for the tabling of next year's report.

And third, regarding the status of recovering the people's money. Based on official information from Zetrix AI to Bursa Malaysia on 13 November 2026, they have submitted a proposal for structured repayment to the government. The people want to know, what are the terms of that proposal? And what is the value of the bank guarantee that MOT is holding, and never give face to those who have committed such acts.

And the fourth is that nearly RM170 million was allocated for JPJ's computerisation. Earlier it was also mentioned by Bakri, why does our system still depend on private agents? When will the Treasury Small Receipts Account system be fully implemented? And for the information of the Honourable Dato' Sri Speaker, in fact the cancellation or termination of MyEG's functions has also had some impact on our society, who are— if we may say— runners who carry out activities such as changing vehicle numbers, transferring vehicles, new vehicles and so on. One of them, I met a person named Amri bin Naser, Armsemock. He indeed lost his economic opportunity completely and had to look for other sources. So, this matter may be reviewed. If a replacement is needed, please build a system or find a new replacement that can provide good services as was implemented before and can also provide income opportunities for our society. And finally, it relates to Item 00200 – Strategic Transport Studies and 60000 – Urban Public Transport. Announced within the framework of the Thirteenth Malaysia Plan, the 2026/2027 Budget. Tenggara wants to know more about the development of the JB e-ART project— Johor Bahru Elevated Autonomous Rapid Transit, namely public transport. It was approved in the Johor State Legislative Assembly in 2024 and welcomed by the Federal Government in 2025, involving the Public-Private Partnership Unit (UKAS) of the Prime Minister's Department. However, the latest developments I have learned of are that the e-ART system has been changed to APM— Automated People Movers. Is this true or not? The Deputy Minister may be able to respond later. Tenggara's question is, what is this APM system, as promised, is it better or superior to e-ART? And what is the financial model for the development of this project? And how much cost is borne by the government?

And with the Johor Government striving to strengthen the vibrancy of JS–SEZ, allowing Johor Bahru, the capital city of Johor, to remain congested is not an option. Malaysia should jointly take the initiative to advance Johor's public transport system, particularly in Johor Bahru, which is the gateway to livelihoods in Singapore as promised. I represent Bangsa Johor, Honourable Deputy Minister, demanding that this public transport system— e-ART or what I mentioned earlier— be fulfilled and realised, and it will complete the new RTS ecosystem in— Malaysia, Singapore has already completed its RTS, and without this, then with the progress of JS–SEZ and the RTS completed, investors will come in, but the people of Johor will still be fighting in Johor Bahru over buses, scrambling for parking and facing jams especially on Jalan Tebrau, Jalan Skudai and throughout Johor Bahru. So, that is what Tenggara wishes to propose. I hope the Honourable Deputy Minister can respond later. One on MyEG and the other on e-ART. That is all, thank you, Honourable Dato' Sri Chairman.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. The Honourable Member for Setiu is invited to speak.

Assalamualaikum warahmatullahi wabarakatuh.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)

Wassalamualaikum.

Dato' Sri Chairman, I turn to Item 020100 – APAD. At present, Chairman, the BAS.MY service only runs from Kuala Terengganu to Merang, and I propose that this service be extended further to Kampung Mangkuk. The reason is that Mangkuk has been declared a state tourist area, becoming a focal destination for tourists, both domestic and international. This is because in Mangkuk there is the mouth of the Mangkuk River, which has been rehabilitated, a Mangkuk River conservation project, and there is a jetty that brings tourists to Pulau Redang. And the Merang estuary conservation project, which previously was

a place or jetty for tourists going to Pulau Redang, will be rehabilitated in early 2027. Surely tourists will focus their attention on this Mangkuk Jetty. Second, because Kampung Rhu Sepuluh, which lies on the route to Mangkuk, is a hub for UCT. UCT is udang celup tepung, Chairman. You are welcome to visit Mangkuk. Third, the Rhu Sepuluh Health Clinic, which lies on the same route, is 90 per cent complete. One day it will become a focal point for residents from Merang all the way to Mangkuk. Fourth, the issue of students of Penarek Secondary School. Where students of Penarek Secondary School who come from Rhu Tapai, come from Merang, Setia Jaya, from Gong Tengah and Telaga Papan, Keranji, Bari Besar, Bari Kecil, they use school bus services to get to Sekolah Menengah Kebangsaan Penarek. But the existing school bus service has now been terminated because the buses are over 15 years old. So now, the students who want to go to Penarek Secondary School from the villages I mentioned earlier, most of them are forced to skip school because there is no bus service. Parents cannot send them because they work in the village, causing many students to skip school, and some students who use motorcycles to get to school are stopped by the police. The police then get involved. So, a BAS.MY service to Mangkuk must be provided, where Sekolah Menengah Kebangsaan Penarek is located along the route mentioned. If the BAS.MY service is not extended, the government or JPJ must offer it to other companies to provide bus services to Sekolah Menengah Kebangsaan Penarek. Mr Chairman, second, Item 010400. The ECRL ticket is rather high. If you want to go to Setiu from Kuala Lumpur, from Gombak, the adult ticket is RM107 one way. For a return trip, RM214. That is for one adult. If two adults and two children, more than RM300 one way. The income of most residents of the East Coast, especially in the Setiu area, falls within the B40 group. So, I propose that if the government can currently give discounts to passengers among senior citizens, persons with disabilities (OKU) at 50 per cent, and passengers among children and students at 40 per cent, what is the harm if the government gives discounts to passengers among the

B40 who are registered with eKasih, among passengers who receive the Sumbangan Tunai Rahmah (STR)? Second, I want to ask about the family fare package. When will it be implemented? Which may offer lower prices. Third is Item 010300 – Air. Currently, for airline tickets, if we buy a ticket and then want to postpone the flight date, the airline imposes a penalty that is sometimes higher than the ticket price. If the ticket is RM134, the penalty is RM174. We have to pay twice. I ask that the government re-evaluate this and hold discussions with such airlines. Fourth relates to— Chairman, I have not debated for a long time, Chairman. Perhaps you could give a little more time today. Fourth is 020600 – MIROS.

There is a budget reduction for 2027 amounting to RM2.35 million. Last year we found that 6,500 lives were lost on the roads. However, in this budget document, the ministry has set a fatality rate target of 1.9 per 10,000 vehicles for 2026 and 2027, higher than the actual achievement of 1.70 in 2025. Why has the MIROS budget been cut? Second, relating to drivers of heavy vehicles under the influence of drugs. The police have reported that the number of drivers testing positive for drugs increased in 2025. I would like the ministry to explain, first, when the driver database under APAD will be operational and whether it will include blood test records? Second, while waiting for the amendment to the Road Transport Act 1987 to be tabled in the first meeting of 2027, what form of immediate assistance or advance funds has the government provided to the heirs and victims affected this year? Thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. Next, the Honourable Member for Tebrau is invited to speak.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Thank you, Dato' Chairman. Tebrau would like to begin by recording its thanks to the Honourable Member for Seremban who resigned on principle, for his efforts throughout

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

the time he led the Ministry of Transport, and his service in addressing many issues relevant today. In particular, for me, he had the courage to tackle the issue of overloading, the issue of heavy vehicles. That was an issue despite opposition outside, but he still had political will, and I hope the Minister who will replace him will continue that effort. Dato' Chairman, recently I was informed by the Johor Bahru Taxi Drivers Association that from 1 January 2027, taxis that cross the border into Singapore will be charged a fee by the Singapore Government, 15 dollars per trip. Whereas currently, the rate is only 2 dollars per month. For them, this is a very heavy burden, and they hope that JPJ can discuss with LTA in Singapore to ensure this fee can be excused or exempted, because at present, Dato' Chairman, Singapore charges 15 dollars, but Malaysia, JPJ or APAD, does not charge any fee to Singapore taxis entering Malaysia. That means it is unfair, it is biased. So, they feel it is unfair. Apart from that, there are also many complaints in Johor Bahru that Singapore Grab drivers, and rental cars that should only be allowed to carry passengers from Singapore to Johor Bahru, what happens is they come to Johor Bahru, they fill up with our cheap petrol, then they also pick up passengers from hotels or shopping malls in Johor Bahru and return to Singapore. In fact this is prohibited. But what happens is, we see that on the Singapore side, their LTA is very aggressive. But on the Johor Bahru side, many people in Johor Bahru have complained, JPJ has not taken any action, and they feel this is very unfair to Malaysian citizens. I would like to move on to the next issue, which concerns Item 20100 – APAD. Dato' Chairman, the issue of road safety. Section 45A of the Road Transport Act currently only stipulates the alcohol concentration limit in a driver's body without providing for specific rights or screening tests for detecting drugs, whereas cases of driving under the influence of drugs are increasingly worrying and require serious attention. For example, last April in Segamat. A trailer driver who was found positive for methamphetamine ploughed into a van, killing three members of one family. Recently, too, a driver was detected

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

Express buses are also positive with syabu when carrying 13 passengers from Ipoh to Johor Bahru. Accordingly, Tebrau welcomes the amendments on compensation for victims that were announced in the Budget 2027. However, this measure needs to be followed by an amendment to section 45A so that the offence of driving under the influence of drugs is also included in that legal provision. This is because accidents caused by driving under the influence of drugs can also have very serious consequences. In fact, in my view it is even worse than cases of driving under the influence of alcohol. Next, on the issue that my friend Tenggara also raised earlier, the issue of the RTS and also the issue of the E-ART. Dato' Chairman, the RTS was actually expected to open, to begin operations on 1 January, but now it has been postponed to February 2027. My question is, I would like to get an answer from the ministry. First, the exact date. A definite date on when it will begin operating in February. Second, since we have postponed it, do we have to pay any compensation or penalties because of the postponement on our side? I also welcome the decision of the Minister— the Cabinet, which approved the e-ART worth RM10 billion. I hope to get more details. When will this e-ART be completed and also which networks are involved? Does it involve the Tebrau and Johor Bahru areas, so that we can resolve this issue and inform the public as quickly as possible? Lastly, Dato' Speaker. I want to bring up a local issue, namely the issue at Taman Sinaran Tropika. This housing area is actually located on land belonging to the Railway Assets Corporation (RAC). The problem is that when this land was placed under the RAC, it became squatter land. The current problem is that the Johor Bahru City Council (MBJB) has difficulty entering to clean up the area. The Ministry of Health (KKM) also has issues entering to prevent dengue, and Indah Water Konsortium (IWK) also does not want to enter for the sewage issue. So, I hope the RAC can explain what the direction or purpose of the RAC is for this land. Will it develop it, or will it do a joint venture (JV)? And if it is going to develop it, what will happen, or how will they handle the issue of the people who currently live on that land? One more issue, Dato' Speaker, is the issue of KLIA. I feel that KLIA is actually a very important and beautiful airport. And we have actually received a new injection from the consortium that came in recently.

Tuan Jimmy Puah Wee TsePKR · PHTebrauEN

But if we look at KLIA today, it is less bright. What I mean is, people who enter Malaysia, their first gateway is KLIA. But when we look at KLIA, I must say, sorry to say, it looks like, like immigration, outsiders are there, foreign workers are all gathered there. It does not reflect a good image for the country at all. Moreover, if we look at KLIA's current performance, it is only ranked 65th in the Skytrax list. Compared with before, we were number 10. What this means is, what happens when we get that money from the consortium, has it started investing in MAHB to beautify KLIA? And besides that, KLIA also now has many smuggling cases. So, what is the action of the Ministry of Transport (MOT) to ensure that the image of KLIA is always defended? For the wrap-up, just landing only, Dato' Chairman. I hope the Deputy Minister can answer the questions raised by me professionally. Do not be like the Deputy Minister earlier who used the government platform to talk politics. I feel that is not proper, and I am fully confident this Deputy Minister is the best Deputy Minister. That is all, thank you.

Mr Chairman (Dato’ Sri Dr. Ramli bin Dato’ Mohd Nor)EN

Thank you, Honourable Member. The floor is now given to the Honourable Member for Padang Rengas.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. Thank you, Dato' Sri Chairman. Padang Rengas rises to debate the allocation of the Ministry of Transport (MOT) under Supply Head B.28 and Development Head P.28 for Budget 2027. Overall, the MOT allocation increases to RM7.072 billion compared with RM6.768 billion in 2026. However, the question is, to what extent is this allocation translated into real benefits for the people? First, Item 00800 — Rehabilitation of the East Coast Railway Track. Actual expenditure from 2023 to 2025 was only RM28.7 million out of RM440.3 million, which is only 6.5 per cent. Why is the expenditure performance so low when the 2027 allocation increases to RM443.4 million? When will the entire Gemas–Tumpat route be completed? [Tuan Syahredzan bin Johan (Bangi) chaired the Committee]

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Second, Item 01600 — Purchase of KTMB Rolling Stock. The government announced the procurement of 42 new train sets, but the 2027 allocation is only RM54 million compared with RM195.2 million in 2026. I would like to draw attention to the residents of Padang Rengas, Kuala Kangsar and all of Perak who have proposed― I propose that the ministry study extending KTM commuter services to Kuala Lumpur so that Perak residents have more frequent and affordable travel options. When will this feasibility study be carried out? Does the procurement of 42 new train sets take this proposal into account? At the same time, I request that the frequency of the ETS on the Ipoh–Kuala Lumpur route and northbound trips be increased, especially during peak periods, weekends and festive seasons. Mr Chairman, third, Item 030900 — My50 Incentive. The allocation increases to RM230 million and MyKomuter50 has been introduced. However, why does the diesel subsidy for KTMB's uneconomic train operations remain at RM22 million? I propose that the monthly pass subsidy be extended to northern commuter users and the East Coast rail services. Fourth, Item 40000 — Air Traffic Control System. The project cost increased to RM2.07 billion, but flight punctuality was only 75.66 per cent in 2025. What is the justification for this cost increase and when will the new system be fully operational? Fifth, Item 12100 — JPJ Development. I request the government to tighten control over the service charges of JPJ collection agents. The public should not be burdened with additional charges without clear limits, while the MyJPJ facility is provided free of charge. Sixth, Item 020300 — Road Transport. The government needs to speed up the amendment of the Road Transport Act 1987 regarding compensation for victims of accidents caused by drunk drivers or drivers under the influence of drugs. Does this protection also cover offences of reckless driving that cause death? Mr Chairman, seventh, Item 020100 — APAD. I urge stricter enforcement against the practice of permit renting or Ali Baba, manipulation of bus ticket prices and unreasonable terminal charges. Digital tickets should not be charged for physical printing. The welfare of e-hailing drivers must also be protected.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Eighth, Item 60000 — Urban Public Transport. I would like to raise the issue of the delay in the construction of lifts at the Padang Rengas KTM Station. When will this facility be completed? This delay causes difficulties for senior citizens, persons with disabilities (OKU) and passengers who need access facilities.

Honourable Member, your time is up. Just one more minute.

Kapten Azahari bin HasanBERSATU · PNPadang RengasEN

Alright. I also propose that priority be given to OKU-friendly pedestrian walkways, dedicated bus lanes, the addition of Park N' Ride facilities, and the expansion of DRT services to major towns including Ipoh. In closing, Mr Chairman, the development of national transport cannot focus only on the Klang Valley. The residents of Padang Rengas, Kuala Kangsar and all of Perak also have the right to enjoy efficient, frequent, comfortable and affordable rail services. I stress that the success of Budget 2027 is not measured by the size of the allocation figures but by the government's ability to complete projects, improve the quality of services and solve the people's problems. I ask the Minister to provide explanations on the questions I have raised. That is all, thank you.

Thank you, Honourable Member for Padang Rengas. Next, I invite the Honourable Member for Tuaran.

Thank you, Mr Chairman. Tuaran begins debating under Supply B.28, Item 020400 — Sabah Commercial Vehicle Licensing Board. Mr Chairman, among the people's problems― especially in Sabah, from around Kota Kinabalu to Tuaran and so on, is traffic congestion. Congested in the morning, congested in the evening, congested all day. Apart from the increase in the number of cars on the road and the need to upgrade existing roads, including completing the Pan Borneo Highway, we also need to improve public transport. I congratulate the government on the step of introducing BAS.MY, or the pink bus, which is now already operating in Sabah around Kota Kinabalu, but only within Kota Kinabalu City. It has not yet entered the surrounding towns such as Tuaran and so on.

Tuaran would like to ask whether― what steps are being taken by the ministry to improve the public transport system, especially in Sabah in Kota Kinabalu and so on, to ensure that traffic congestion can be tackled as effectively as possible. And Tuaran proposes that the pink bus be expanded from Kota Kinabalu to Menggatal, Telipod up to Tuaran, and if possible, later there should be a network that also enters rural areas, including Pekan Tamparuli and so on. I now continue to Supply B.28, Item 031100 — Air Ticket Subsidy, which refers to Flysiswa. This is a programme that greatly helps students and is also a very good programme. Nevertheless, as a Member of Parliament, I often receive complaints and questions from students about not getting, they did not get this assistance, and various questions whether the allocation is insufficient and so on. They also say that for those who get this programme, there is no flexibility for other flights. It is only for MAS. So, will the government relax this― expand this programme to other flights so that students have the opportunity to choose whichever one they prefer according to affordability, yes? Because although it has been increased up to RM500 now, in terms of affordability, students are still burdened with the existing fares.

Yes. Next, in terms of― I continue to Item 80000 – Port Infrastructure Maintenance. So, under this item RM15 million is allocated. We know that under the Federal Constitution, port matters, if in Sabah and Sarawak, are state matters. They have Sabah and Sarawak matters. But in Peninsular Malaysia, port matters, allocations are given to major ports such as Port Klang, Tanjung Pelepas Port, Kuantan, Kemaman and so on. So I want to ask, does this RM15 million include maintenance allocated to Sabah or not? But besides that, I want to take this opportunity to state that because under our Federal Constitution we are autonomous in constitutional matters, that is why we demand some of our rights under the Federal Constitution, including the 40 per cent right. Because we

are autonomous in port matters, among others. There are also other matters such as fisheries, animal matters, livestock and so on, where we are autonomous. That is why we demand these rights so that our rights are fulfilled, yes. And I also want to ask, how, in the case where a port, in this case the port here, that is in Sabah, is autonomous, how does the ministry view this as a way to address a very important matter, namely improving logistics further, matters related to logistics? Finally, Mr Chairman, is Item 13000 – Construction and Upgrading of Airport Infrastructure. This item is allocated RM112.28 million. It is indeed not mentioned in this expenditure, this item is for the Lahad Datu Airport matter. But the Lahad Datu Airport is a very critical airport, very important in terms of logistics to further enhance investment in the POIC Industrial Park in Lahad Datu. Yes. Some time ago, in a question of mine in this House, it was stated that there was an allocation of RM20 million for...

Honourable Member, your time is up, Honourable Member. Just one more minute.

Yes. Okay, thank you, Mr Chairman. There is RM20 million. I want to know, does this RM20 million really exist there? And how― how is this RM20 million spent to upgrade the existing Lahad Datu Airport, where this airport is very dilapidated? We do not have a proper tower and so on, yes. And in connection with that, we are also in the process of― this is the Sabah Government's step. Through POIC, we want to upgrade and build a new airport. Does the Ministry of Transport give full support to these steps, and what is the support that can be provided by the ministry in this matter? That is all, thank you.

Thank you, Honourable Member for Tuaran. Next, I invite the Honourable Member for Alor Setar.

Thank you, Mr Chairman, my friend the Honourable Deputy Minister.

I touch on matter P.28 00900 concerning increasing KTMB's capacity. Only that one matter. There are four issues, Mr Chairman. The first is about cable theft. If I refer to the earlier search, this has happened since 2008 and the problem has recurred repeatedly up until this year. And the Honourable Minister mentioned in the Dewan Negara previously, on 3 August 2026, 432 cable theft cases, where the total losses borne amounted to RM16 million. That one is alright, the government can bear it, but the passengers, they have to bear the delays resulting from the cable theft, and the delays amount to 246 hours a year. This is something I feel the ministry must take seriously, because railway users, especially ETS, I am talking about the ETS issue, including commuters, most of them are ordinary users, who need this transport. So my question is, out of the RM900 million allocated to increase KTMB's capacity, how much is allocated to address this issue, cable theft? Install fences or what, CCTV or how. What plans are to be made? And if there have been arrests, can the Honourable Deputy Minister inform us how many have been charged and how many convictions have been secured? The second is about the consequences of the cable theft and these delays as well. How will compensation be paid to passengers whose affairs have been affected by these delays? Is the government prepared to consider compensation? The problem is, they have already boarded the train. The train has already moved. Halfway, the captain informs that there is a communication disruption. I often experience it. I am a hardcore ETS user every week. One hour, two hours. So, can the government be prepared to consider compensation so that there is a great sense of responsibility on the part of KTMB and also on the part of other parties to avoid having to pay compensation to passengers? But not all passengers are entitled to compensation. There may be certain specific conditions. And as an example, on 14 June last, equipment line failure. This is an equipment failure, not due to cable theft, Honourable Member. Delayed by 3 hours 34 minutes from Tiroi to Seremban. On 26 September last, failure of the signalling system. This is not cable theft. Delayed by 305 minutes, more than five hours. Station from KL Sentral to Butterworth, ETS express 9138. These are the matters which

I meant earlier, not caused by cable theft. Because of those signalling faults, will the government be prepared to pay compensation? The third point, related to this delay too, is whether KTMB or the Ministry can create a system for early notification to passengers. When they already know there is a communication problem early on, they send a notification to the handphone or app that the train is delayed. Like a flight, they inform you early that it is delayed. From my experience taking the ETS for four years since becoming a Member of Parliament, we have never received a notification of a train delay. What we know is that we are on the train and it is late. We cannot get off because, well, it is a train. If it is an express bus, it can stop at an R&R, and you can take another vehicle to that place. If it is an aeroplane, you receive early notification. So, what mitigation measures are there if, for example, there is a delay of five hours? Can a bus come to pick us up? But what if it is in the middle of a forest, how do they pick us up? What if it is in the middle of a tunnel, how do they pick us up? These are matters that I think the Ministry should consider. The third point on this matter is the issue of the north–south train transfer policy at KL Sentral Station. This is something that has been quite heatedly raised by netizens. It is understood that starting 1 January 2027, trains from the north to JB Sentral will have to stop at KL Sentral for passengers to change to another train. Although KTMB has its reasons for increasing train usage and providing more passenger seats, okay, we accept that. But how will KTMB manage the transit process? There are elderly people, there are children, there are families. When they arrive at KL Sentral, where are they to wait for the second train? Food, prayer, toilets, facilities, I think KTMB is probably taking these into account, but passengers want to know so that they do not feel anxious. And the second point relating to this train transfer is also, how long does it take? When they arrive at KL Sentral and have to wait for the second train, how long will it take? Previously it was direct. And I suggest to the Ministry, can we, within a day, run just one direct train, like a direct flight, from the north to JB Sentral to address the issues faced by the elderly and children who find it difficult to change stations. And finally, Mr Chairman, is about the maintenance of KTM Alor Setar Station. This is a local constituency issue. Now is the rainy season, Honourable Deputy Minister. If the Honourable Minister goes to the Station

KTM Alor Setar Station is full of buckets. Kedah folk call them "timba". Kota Raja people know them as baldi. The roof is leaking, everywhere. So, I think it is not only in Alor Setar, perhaps this happens in other places too, and this is very dangerous, especially when we scan our QR code and pass through the gate, and immediately see buckets. Yes, that is one thing that is not pleasant, because a KTM station is not a shop selling buckets, pails and brooms. Such things should not happen. And the entrance and exit lanes are narrow. The lane to enter the car park is also the same lane used for the passenger pick-up and drop-off, even though the available space is wider. How about if KTMB RAC opens another entrance to the car park so that it does not clash with the entry and exit lane?

And finally, I have also asked the Minister before. There is an unused empty parking space on that side, by the railway tracks at KTM Alor Setar Station. It was said that it is because a new counter needs to be built. Enter on that side, build a new counter. Why not build that new counter? Because Alor Setar has many users, like Bukit Mertajam. Bukit Mertajam can have two counters, why can't Alor Setar? So, I suggest, submit an application to upgrade KTM Alor Setar Station in the near future because its users are increasing. Thank you, Honourable Speaker. Thank you, Deputy Minister.

Thank you to the Honourable Member for Alor Setar. Next, I invite the Honourable Member for Putatan.

Thank you, Mr Chairman. Item 020100 – Land Public Transport Agency (APAD). Accident signalling system. That was the first idea that came to Putatan's mind after reading the news of a road accident that claimed the life of a p-hailing rider in the Klang Valley at the end of October. That tragic news was also shared on social media by Fatin Alia, an individual who had placed an order for goods delivered by that p-hailing rider. A waiting period of two hours without any response from the rider was enough to worry anyone

customer. Besides wondering, a feeling of anxiety also arises when we wait for a p-hailing delivery that takes much longer than usual. The experience of that individual should be taken as a lesson by the Ministry of Transport. As the agency responsible for p-hailing matters, APAD needs to look into the urgent need to improve the functions of the p-hailing applications used by the people in this country. In this regard, Putatan would like to recommend that APAD make it mandatory to develop accident signalling details in p-hailing booking applications. The creation of such details is important to serve as uniform compliance for every p-hailing service operator throughout the country, including those operating in the state of Sabah. The Land Public Transport Agency (APAD) needs to carry out a detailed study together with p-hailing companies to ensure that the goods and food delivery system in this country is truly highly capable of implementing the following five Ms. First, identifying the actual condition of the p-hailing rider before, during and after picking up the booked item in real time. Second, informing the p-hailing rider about current traffic conditions involving the pick-up and delivery routes of the booked item in real time. Third, conveying current information to the relevant customer, the condition of the booked item before and during the journey including the condition of the p-hailing rider in real time. Fourth, issuing an emergency notification to the operations monitoring team at the head office of the p-hailing company before being informed to the customer if an accident occurs. And fifth, contacting the relevant enforcement authorities directly to help settle accident matters, including ensuring that the p-hailing rider receives immediate proper treatment at the nearest hospital. The spouse or closest family members of the p-hailing rider must also be contacted immediately. The proposal that Putatan has put forward will certainly involve a large expenditure, as well as requiring a higher level of digital capability adaptation. However, these challenges should not be used as an excuse by p-hailing operating companies. They cannot

evade any longer on the matter of safety protection for registered p-hailing riders. Road safety is a humanitarian matter. p-hailing companies should have already started taking steps to hold a series of discussions with APAD. Two-way discussions must be held actively to examine all the needs to develop the additional important safety details in a booking application. Apart from being able to quickly match bookings with rider availability, p-hailing booking applications must also function responsively. p-hailing applications that are now widely used must function effectively to send emergency notifications, considering that they also involve a human life. Mr Chairman, that concludes Putatan's debate speech. Thank you.

Thank you, the Honourable Member for Putatan. Next, I invite the Honourable Member for Labuan.

Thank you, Mr Chairman. I go straight to Item B.020200 – Sea Transport, P.00200 – Transport Strategic Study. Next, I would like to draw the attention of the Ministry of Transport to a problem that has long plagued the people of the Federal Territory of Labuan, namely the increasingly serious traffic congestion caused by the location of the Labuan Vehicle Ferry Terminal, which is situated in the central business district of Labuan. Mr Chairman, imagine when hundreds of vehicles have to queue up for a long time waiting for their turn to board the scheduled ferry. This situation causes very severe traffic congestion starting from the roundabout in front of the Labuan Customs Department all the way to the entrance road of the Labuan Vehicle Ferry Terminal. This situation not only inconveniences ferry users, but also affects the movement of other road users, including local residents who have daily business in the town centre. My question, Mr Chairman, how long must the people of Labuan face the same problem without a long-term solution that is truly effective?

For this reason, I would like to put forward three concrete proposals to the Ministry of Transport. First, relocating the Labuan Vehicle Ferry Terminal to the Kampung Nagalang area. I would like to propose that the Ministry of Transport conduct a feasibility study to relocate the Labuan Vehicle Ferry Terminal, which is currently located in the town centre, to the Kampung Nagalang area, Kerupang. I believe this area is more strategic in terms of geographical location and long-term transport development planning. Relocating this terminal not only has the potential to solve the traffic congestion problem in the town centre, but can also shorten the distance and travelling time of the ferry between Labuan and Menumbok. Based on its geographical location, I expect the travelling time could potentially be reduced by more than 30 minutes, subject to confirmation through technical studies and shipping routes. Imagine the savings in time and operating costs that can be achieved if the ferry journey can be shortened; users will enjoy a faster and more efficient journey. I want to ask the Minister, is MOT prepared to carry out a feasibility study on relocating this terminal and to set a clear timeline for the study? My second proposal is that the Ministry of Transport add at least two more vehicle ferries to the number currently in operation. However, I would like to go much further than merely proposing the addition of ferries. I propose that MOT open opportunities for new operators and specifically consider the Labuan Corporation as one of the vehicle ferry operators between Labuan and Menumbok. Why the Labuan Corporation? Because the Labuan Corporation is the local authority responsible for the development and well-being of the people of the Federal Territory of Labuan. I believe the Labuan Corporation should be given the opportunity to play a more direct role in providing transport services that are very important to the people. With more operators, we can reduce dependence on existing operators, create healthier service competition and increase the frequency of ferry trips. We do not want the people of Labuan to continue facing the difficulty of obtaining tickets, waiting too long

and extraordinary vehicle congestion, especially during festive seasons and school holidays.

My third proposal is that the Ministry of Transport consider extending the operating hours of vehicle ferry companies until 12.00 midnight. This means the last ferry from Menumbok to Labuan departs at 12.00 midnight, and likewise the last ferry from Labuan to Menumbok. At the same time, the number of trips or frequency of ferries needs to be increased, especially during peak periods, festive seasons, school holidays and when major events are held in Labuan. We are talking about efforts to boost Labuan's economy, increase tourist arrivals and encourage the holding of various sports, cultural, food festival and tourism programmes. But how are we to better attract visitors from mainland Sabah if they are bound by limited ferry operating hours? That is why I believe increasing trip frequency and extending ferry operations until 12.00 midnight are among the important measures to boost Labuan's economy and tourism sector. That concludes my speech, thank you, Mr Chairman.

Thank you, the Honourable Member for Labuan. Next, I invite the Honourable Member for Keningau.

Thank you, Mr Speaker. I now move to page 335. Keningau requests that the Ministry of Transport fully implement the vision and mission of the ministry in Sabah. The Kota Kinabalu International Airport (KKIA) needs to build a second runway immediately, and plans are to be made to build a new international airport. Increasing the passenger arrival capacity of KKIA from nine million to 12 million does not mean anything if the runway remains single, as proven on 17 September 2026, when the airport had to be closed and more than 20 flights were cancelled, diverted or delayed as a result of the penurapan of the single runway.

Any disruption to operations will affect not only passengers but also airlines, tourism operators, hotels, traders, exporters and investors. Sabah's tourism sector is the second largest contributor to Sabah's economy, with tourism from China, Korea and globally increasing, and KKIA is the main gateway to the Peninsula or the ASEAN region and the world. Furthermore, 2027 is the Visit Sabah Year. For Sabah, air connectivity is not a luxury but a necessity, and it is a lifeline for those in the tourism, trade, investment and economic development sectors. Therefore, Keningau hopes and also asks when the government will build this necessary second runway? Item 010300 – Air, RM11.01 million. What is the government's plan to establish a Borneo Civil Aviation Authority (BCAA), given that there is already AirBorneo in Sarawak and Sabah Air Aviation in Sabah? The BCAA could operate in a system like that in the United Arab Emirates, where the civil aviation authority of each emirate operates autonomously under the General Civil Aviation Authority of the United Arab Emirates. This has allowed the aviation industry to compete and grow rapidly, with airlines such as Emirates, Etihad Airways, Air Arabia and flydubai. With the establishment of a BCAA base alongside the Civil Aviation Authority of Malaysia, the aviation industry in Sabah and Sarawak can develop according to and at their own conditions and pace, and it will not affect the aviation industry in Malaya. Item 030700 – Issue of Rural Air Service Subsidy, RM200 million. Rural air services are very much needed in Sabah and Sarawak. But the helicopter crash during the flying doctor services in Sarawak on 8 September last year— 2026 shows the risks of helicopter flights. Apart from service subsidies, Keningau also proposes that the government consider purchasing helicopter assets for rural air services. With government assets, the subsidy may be reduced. Dato' Yang di-Pertua, Menumbok–Labuan ferry passengers enjoy subsidised fares, but passengers on the Kudat to Pulau Banggi ferry have to pay full fare. Keningau hopes the government will consider and approve a ferry fare subsidy from Kudat to Banggi.

During the Committee Stage debate on the 2027 Budget of the Ministry of Finance, Keningau raised the construction of a railway line from Sepanggar Port, Kota Kinabalu to Keningau through a new tunnel penetrating the Crocker Range, and an inland port and industrial area in Keningau, with a railway connection from Beaufort to Bintulu, Sarawak. Also a new monorail line, Putatan–Kota Kinabalu – UMS – Federal Administrative Complex. Keningau hopes...

Honourable Member, you have one more minute.

Yes. Keningau hopes the Ministry of Transport will support and plan its implementation. That concludes my speech, thank you.

Thank you, the Honourable Member for Keningau. Next, I invite the Honourable Member for Ipoh Timor.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Thank you, Mr Chairman. I refer to P.28 Item 00900 – Enhancing KTMB's Capacity at RM907.1 million, as well as Item 01600 – Purchase of KTMB Rolling Stock at RM54 million, on page 347. I support the Ministry of Transport's allocation and I would like to focus on four matters, namely train reliability, skilled rail manpower training, freight transport and public mobility, especially for the people of Ipoh. The government announced the procurement of 42 new train sets for ETS and KTM Komuter. I ask the Minister and Deputy Minister to explain the breakdown between the two services, the delivery schedule and the date of commencement of operations. And since the annual allocation for rolling stock has decreased, does this reflect a payment schedule or financing through other channels, for example any off-budget payments? For users in Ipoh, what increase in trips and seats will they enjoy? I suggest that the Ministry publish punctuality performance, trip cancellations and train availability every quarter so that we can track, with permission. And passengers need certainty to plan their journeys to work, attend hospital appointments and return to their families. Regardless of whether it is the festive season or not.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Secondly, in the touchpoint document, it lists RM50 million for a centre of excellence, namely the National Rail Centre of Excellence in Batu Gajah, and I was actually directly involved in its early-stage negotiations, as well as cooperation with China in LRVT, Liuzhou Railway Technical Vocational Training College. I welcome this announcement and request confirmation of the allocation code, the implementing agency, which as far as I know so far is MRDC, which I believe is in the House, and the implementation schedule. My priority is the development of trainers and local expertise.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Of course I support, have proposed, or have previously proposed and supported, the use of the MyRA facility in Batu Gajah and the coordination by MRDC as I mentioned earlier, and the cooperation of the National TVET Council. I am willing and ready to give 100 per cent cooperation, including through training cooperation with LRVTC that I mentioned earlier. Prioritising four areas is my demand: passenger services, freight transport or cargo and freight, power systems (power systems), and signalling systems. I request that the Deputy Minister state the target the ministry intends to set for local trainers to be trained, the form of recognition and certification, and the involvement of operators in terms of their financial contributions, namely EOSB. Not only EOSB, actually, but also MRL, ERL, KTMB itself, and so on. This centre must meet the needs of the entire national rail industry, with the capacity to develop into an ASEAN Regional Training Centre. Thirdly, I refer to P.28, Item 01100 – Rail Connection to Ports, or road to rail, amounting to RM18.108 million on page 347 as well. I request that the ports and alignments involved, the completion dates, and the additional cargo capacity be stated. What are the benefits to producers and logistics activities in Perak? I propose an annual target for the shift of cargo from road to rail, measured by the number of containers, tonnes of cargo and tonnage, and the cost of delivery. Physical connections must be accompanied by train slots, competitive tariffs and reliable delivery times. MOT must also discuss with MOF. MOF also— MOF is not here. MOF is not here, it was here earlier. It needs to discuss with MOF regarding double deduction tax relief for eligible expenditure to encourage this shift.

Tuan Lee Chuan HowDAP · PHIpoh TimorEN

Fourthly, I refer to P.28, Item 60000 – Urban Public Transport, amounting to RM2.691 billion on page 348. I request that the Deputy Minister provide a breakdown by town and city and by project, including the allocation for Ipoh. I propose that scheduled bus connections between the Ipoh KTM station, residential areas, hospitals and employment centres, and bus timetables, be coordinated with train arrivals. Operator contracts must set minimum frequencies, last trips, and compliance with timetables, together with senior-citizen-friendly facilities and wheelchair-accessible facilities. Measure success through waiting times (punctuality), trips carried out, and passenger numbers. Lastly, Mr Chairman, I request a more specific answer on the financing codes, implementation dates, and the outcomes that the people will receive. Every allocation must produce safer, more reliable, more accessible journeys, and be easier for Members of Parliament, particularly the Honourable Ipoh Timur, to track. That is all, thank you.

Thank you, Honourable Ipoh Timor. Next, I invite the Honourable Merbok.

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Thank you, Mr Chairman. Assalamualaikum and salam sejahtera. I wish to raise specifically the allocation under Head P.28, Item 03600 – Dredging Works at Small River Mouths at Ports in Peninsular Malaysia, amounting to RM25 million, focusing on the mouth of the Merbok River in the Tanjung Dawai area, Kedah. It shows a fairly significant decrease compared with the allocation this year of RM86 million. Maintenance of waterways, or works to deepen this river mouth, is extremely important to ensure the economic survival of fishermen, navigational safety, the income of boat operators, the supply chain of marine produce, and the economic development of coastal communities. Tanjung Dawai is an area with important fisheries economic value and fishing boat movement activity. A shallow river mouth will cause sand and silt deposition, which can hinder boat movement, especially during low tide. I

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

hope that the mouth of the Merbok River, namely in the Tanjung Dawai area, is also included in the list of this allocation. Next, I wish to debate the allocation under Item 01600 – Purchase of KTMB Rolling Stock and Item 20000 – Rail Infrastructure Upgrading. In my view, the purchase of rolling stock and new train assets is an important investment in efforts to improve the quality of the nation's public transport. Merbok wants to obtain an explanation from the ministry. To what extent will this purchase be able to increase passenger capacity, add trip frequency and reduce congestion, particularly for the ETS service? We need to know that the ETS has become one of the main choices of the people for long-distance travel, particularly for the West Coast Peninsular route, namely from South to North, from Johor Bahru to Kuala Lumpur–Ipoh–Butterworth and Padang Besar. The demand for this service is increasingly important and popular because people want transport that is more comfortable, safer, punctual, and reduces dependence on private vehicles and, at the same time, can reduce congestion on the nation's main highways. However, when demand increases but train capacity and trip frequency do not grow in tandem, in the end passengers have to face tickets that sell out quickly, difficulty obtaining seats, and a limited choice of travel times, and, as discussed earlier by the Honourable Alor Setar, frequent disruptions and so on. Therefore, I wish to stress that the allocation of RM54 million for the purchase of this rolling stock must be translated into real capacity increases and more effective improvements to ETS services. Like Alor Setar earlier, I also wish to raise the matter of the railway station in Sungai Petani. The situation is the same as in Alor Setar earlier. It has two sides, on the left and right, but only one side is open, and this causes congestion because that is the only entrance/exit. So, we request KTM to look at that situation so that both sides of the station can be opened to reduce congestion. Next, Item 40000 – Upgrading and Development of Traffic Control/Management Systems, amounting to RM258 million. Mr Chairman, I wish to draw the attention of the House to a report on an incident in the United States on 14 November, which was only two days ago, when the Federal

Tuan Mohd Nazri bin Abu HassanBERSATU · PNMerbokEN

Aviation Administration (FAA), with permission, had to order a temporary halt to flight operations across the entire United States for four hours following a communication system failure that affected air traffic operations. This incident provides a very great lesson for Malaysia. Imagine a developed country such as the United States, which has among the most advanced aviation technology in the world, can still face communication system disruptions to the extent that flight operations had to be temporarily halted. I wish to remind the ministry that if the communication system between pilots and the control tower is disrupted, air traffic controllers may face difficulties in conveying instructions, coordinating aircraft movements and ensuring safe separation distances between aircraft. The question is, if the same thing happens in Malaysia, what are our preparations? Do we have an alternative communication system that can take over operations immediately, or does the air traffic control centre have a backup system separate from the main system? I wish to raise several questions here. Does CAAM have a backup communication system should the main air traffic communication system fail? Does Malaysia's aviation communication system have redundancy, that is, more than one communication channel that can operate independently? When was the last time the ministry conducted a comprehensive communication failure simulation at the air traffic control centre? Is Malaysia's air traffic control system protected from cyber attacks, radio frequency interference and communication manipulation? And does Item 40000 include the upgrading of communication systems, backup systems and cybersecurity protection? Mr Chairman, finally. This incident in the United States should serve as a warning to all countries, including Malaysia. We may spend billions of ringgit to develop airports, buy aircraft and upgrade transport infrastructure, but if communication and traffic control systems fail to function, the entire aviation system can come to a halt. Aviation safety cannot depend on luck. It must be based on robust systems, tested procedures and a readiness that is alert. Thank you, Mr Chairman.

Thank you, Honourable Merbok. Next, I invite the Honourable Shah Alam.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera. Greetings of Malaysia Madani. Thank you, Mr Chairman. Firstly, I refer to two items of the 2027 Budget of the Ministry of Transport. For the purpose of Supply B.28, Item 020300 – Road Transport, amounting to RM752 million, and for the purpose of Development P.28, Item 40000 – Upgrading and Development of Traffic Control/Management Systems, amounting to RM258 million.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Mr Chairman, I wish to raise the issue of road safety, which is increasingly worrying, particularly the recurring accidents at the Alam Budiman junction, Persiaran Mokhtar Dahari in Shah Alam. This junction is not only the main route for residents of Alam Budiman, Puncak Perdana, Puncak Alam and the surrounding areas, but is also used by many heavy vehicles. Most recently, on 9 October 2026, a 10-tonne lorry crashed into 11 vehicles at this junction, resulting in four people being injured, including two victims who suffered serious injuries. Imagine, Mr Chairman, road users who are stopped at traffic lights, suddenly being hit by a lorry that has lost control. What is more worrying, the initial screening test on the lorry driver was reportedly positive for the drugs amphetamine and methamphetamine. This is not an isolated incident, Mr Chairman. On 25 February 2026, a fatal accident involving a lorry that lost control also occurred in the area. On 4 May 2026, another fatal accident involving a car took place in this area. How many more accidents must occur before a comprehensive solution is implemented? Residents have lost their patience. On 12 June and again on 25 October recently, residents held peaceful assemblies demanding an immediate solution. Alam Budiman is no longer a peaceful area, but has become an 'alam barzakh.' They are not asking for anything extraordinary. They only demand safety for themselves and their families.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

I take note that JKR Selangor has implemented several road improvement measures, including works to upgrade road furniture, safety facilities and several quick win measures. However, short-term measures alone are not sufficient. I request that the Ministry of Transport work with the Ministry of Works, JKR Selangor and the Selangor State Government to carry out a full and comprehensive safety audit at this Alam Budiman junction. The audit must assess road design, gradient, traffic light systems, heavy vehicle speeds and the need for flyover construction. Mr Chairman, under P.28 Item 40000. As I mentioned earlier, I propose that traffic management systems in high-risk areas such as this be strengthened through automatic speed monitoring technology, offence detection cameras, early warning systems and control of heavy vehicle movements. Do not wait for accidents to happen before we want to act. Traffic systems must be able to prevent accidents, not merely record how many accidents occur and identify who is at fault. I also propose that the telematics system launched on 29 June 2026 for commercial vehicles be implemented for effective enforcement, including speed monitoring, driving patterns and compliance levels of heavy vehicle operators, and that the public be informed of how effective it is and, in terms of compliance and also the reduction of accidents, that this can be communicated to the public so that it becomes a lesson for all road users. Mr Chairman, I welcome the proposed amendment to the Road Transport Act 1987 [Act 333] announced in the recent budget, so that accidents caused by the influence of alcohol or drugs are required to pay compensation to victims or their heirs. However, I also wish to propose that the scope of this amendment not only be expedited, but also be broadened. Because intoxication, Mr Chairman, is not only due to alcohol or drugs. Many kinds of intoxication exist on this road. Intoxication to race, intoxication to run red lights, intoxication to drive recklessly, and various other conditions that can endanger and cause death or serious injury. For this reason, I earnestly request that this Act be expedited, because I am confident it will be able to create awareness and prevent many accidents from occurring.

Tuan Haji Azli bin YusofAMANAH · PHShah AlamEN

Finally, Mr Chairman, road safety is not merely a matter of roads, traffic lights or enforcement; it is a matter of human lives. I very much hope that the ministry will give special attention to the Alam Budiman junction and present a clear action plan, complete with an implementation schedule. Thank you, Mr Chairman.

Thank you, Honourable Shah Alam. Next, I invite the Honourable Mersing.

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Mr Chairman. Firstly, I refer to Item B 040000 – New Policy, B 040100 – Rental of Transport Sector Enforcement Equipment. Under Item B 040100, RM1.98 million is allocated for the rental of transport sector enforcement equipment. I wish to obtain an explanation regarding the proposed phased implementation of telematic devices for commercial vehicles and heavy vehicles. Firstly, what is the basis of the scientific and technical study used by the ministry to prove that the use of telematic systems can significantly reduce the risk of road accidents? Has an effectiveness assessment and cost-benefit analysis been carried out with the involvement of the Road Safety Research Institute (MIROS), the Land Public Transport Agency and the Road Transport Department? Secondly, the ministry has introduced speed limitation devices to control the speed of certain vehicles, while high-speed weigh-in-motion technology is used to detect vehicles carrying excessive loads. Therefore, what is the actual added value of telematic systems compared with existing enforcement mechanisms? Is this system intended to monitor speed, driving behaviour, driving duration or vehicle location? How will data from these systems be integrated so that there is no duplication of functions and no increase in the compliance burden on the industry? Thirdly, based on the ministry's announcement, the estimated cost of telematic subscription is between RM60 and RM300 per month for each vehicle. This means that an operator who owns 10 vehicles could potentially bear costs

of between RM7,200 and RM36,000 per year in subscription fees. This does not include possible additional installation and maintenance costs. The question is, has the ministry carried out a financial impact analysis on small and medium-sized operators? What assurance is there that the implementation of this system will not increase the operating costs of the transport industry, which will ultimately be passed on to consumers? I also wish to obtain an explanation regarding the procurement method, technical standards and selection of technology providers so that there is no monopoly or dependence on certain suppliers. I take note that the voluntary implementation of telematics is planned throughout 2027 before being made a mandatory licensing requirement in 2028. Therefore, what were the outcomes of the engagement sessions with transport operators' associations, and does the government intend to provide incentives, matching grants or a reasonable transition period for small operators? We support the use of technology to improve road safety. However, the new policy must be based on evidence of effectiveness and should not merely add compliance costs to the industry. Mr Chairman, secondly, Item P.03600 – Dredging Works at Small River Mouths at Ports in Peninsular Malaysia. With reference to Item P.03600, RM27.1 million is allocated in 2027 out of a total estimated project cost of RM192.9 million for dredging works at small river mouths at ports in Peninsular Malaysia. I wish to raise the urgent need to carry out dredging works at the Mersing River mouth and the construction of an appropriate breakwater. The issue of dredging the Mersing River mouth was previously raised by me in the Special Chamber on 7 October 2025, when it was informed that dredging works in Mersing, Batu Pahat and Muar had been postponed to 2027. However, according to the latest review, the Marine Department of Malaysia has advertised a tender for periodic dredging works in the Kuala Mersing navigation channel, with a closing date of 19 June 2026. Therefore, I wish to obtain an explanation from the Minister: what is the actual status of that tender?

[Deputy Speaker (Puan Alice Lau Kiong Yieng) chaired the Committee]

Has the contract been awarded and have physical works commenced? What is the value of the contract, the volume of sediment to be dredged, the targeted depth of the navigation channel, and the implementation period of the project? I also wish to know whether the RM27.1 million allocation in 2027 includes dredging works at the Kuala Sungai Mersing, or whether the project has been financed through previous allocations. The Kuala Sungai Mersing is an important route for fishing boats, passenger boats and transport to tourist islands. However, the problem of sediment deposition that causes the route to become shallow, coupled with waves and currents during the Northeast Monsoon, can increase the risk to navigational safety. That is all, thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Mersing. I invite the Honourable Tenom.

Thank you, Honourable Chairman. I, Tenom, would like to give special attention to Item 00200 – Transport Strategic Study, allocated RM16.5 million, with focus on the Trans-Borneo Railway Project, which has the potential to become a catalyst for transport development, international trade and economic growth in the Borneo Region. Honourable Chairman, for your information, Sabah is the only state in the Borneo Region that has a conventional railway service still in operation, through the Tanjung Aru–Beaufort alignment and to Tenom, operated by the Sabah State Railway Department (JKNS). In contrast, Sarawak, Brunei Darussalam and Indonesian Kalimantan still do not have a conventional passenger railway network spanning the region. Although JKNS is under the state government's administration, the Federal Government needs to view the development of the rail sector in the Borneo Region on a broader scope, and not merely be bound by the boundaries of administrative jurisdiction, but take into account its strategic importance to the nation's economic competitiveness.

In fact, the strategic location of Sabah and Sarawak along the South China Sea, which forms part of the Maritime Silk Road network, opens up great opportunities to make the Borneo Region a regional trade and logistics hub connecting the markets of East Asia and the international economy. In this context, the Trans-Borneo Railway Project is not merely the construction of tracks, but has the potential to form a new economic corridor connecting production centres, industrial areas, cargo terminals and major ports across the Borneo islands. Honourable Chairman, as previously informed by the ministry, the feasibility study for this project was completed on 7 August 2026, with the finding that the project is technically viable. However, it still requires government financing support and must be implemented in phases. Accordingly, Tenom requests that the ministry table the full report of the feasibility study for thorough examination. At the same time, Tenom would like further clarification on several key matters, namely, first, which alignment for the first phase has been identified as most viable in terms of economic and international trade? What is the estimated development cost and implementation timeline? Second, to what extent has the ministry assessed the potential for integrating the Trans-Borneo Railway Project with the strategic port network in Sabah, particularly the Teluk Sepanggar Container Port and the Lahad Datu Palm Oil Industrial Cluster, and the major port in Sarawak, to fully leverage Borneo's position in the Maritime Silk Road? Third, what form of diplomatic cooperation and financing structure is planned between the Federal Government, the Sabah State Government, the Sarawak State Government and neighbouring countries such as Brunei Darussalam and Indonesia, to ensure the development of this network can be implemented in an integrated manner? Honourable Chairman, in planning this large-scale mega project, the interests of rural communities must not be sidelined under any circumstances. Therefore, Tenom requests that the ministry ensure that the planning of this Federal rail network is coordinated with the Sabah Sustainable Transport Master Plan, which will commence in 2027, including examining the connectivity of interior areas such as Tenom, Kemabong and Lalap with the regional logistics network.

In addition, the production of agricultural produce and commodities in the interior needs to be given access to a more efficient cargo transport system so that delivery costs can be reduced, markets expanded and new economic opportunities created. Let it not be that the development of the Trans-Borneo Railway Project only connects major towns and large ports, while interior areas rich in economic production resources remain marginalised from enjoying its benefits. Honourable Chairman, finally, the study of this project should not be measured solely by the length of the track or the value of investment, but by its ability to strengthen the country's trade competitiveness, narrow the development gap between regions and improve the living standards of the people of East Malaysia. The Borneo Region should not merely become an international trade transit route. Instead, it must emerge as a new centre of economic growth whose benefits can be enjoyed equitably by all the people. In conclusion, Tenom requests to support. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Tenom. I invite the Honourable Member for Kuala Kedah.

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of peace. Thank you, Mr Chairman. I would like to touch on four items. Two items under the purpose of Supply B.28 and two more under Development P.28, specifically concerning the policy on navigational safety and national maritime development. First, B.28 Item 010200 – Maritime. The allocation in 2027 increases from RM2.25 million to RM7.59 million. Previously, the government introduced the National Transport Policy 2019–2030, emphasising safety, connectivity and maintenance of transport infrastructure. However, I would like to ask, to what extent does the national navigational safety policy take into account the needs of small ports, river mouths and coastal fishing communities? Maritime safety does not only involve commercial vessels and passenger ferries, but also small fishing boats that share the same shipping lanes.

In this regard, I propose that the Ministry of Transport (MOT) prepare a master plan for small port navigational safety covering risk mapping, shipping lane management, periodic dredging, vessel traffic monitoring and maintenance of navigational aids. This plan must have planned allocations, safety performance indicators, and coordination between MOT, the Ministry of Agriculture and Food Security (KPKM) and the Malaysian Maritime Enforcement Agency. Mr Chairman, second, B.28 Item 020200 – Sea Transport. The allocation for services and supplies decreases from RM68.02 million to RM64.58 million. I would like to know whether this reduction affects the maintenance of the Marine Department's navigational safety systems, including VTMIS radar, lighthouses, light beacons and pilot buoys. In Kuala Kedah, there is a historic lighthouse within the fort area of Kuala Kedah. What is its status as a navigational aid at present? In addition, the notice to mariners in August 2025 reported that the Kuala Kedah 1G light beacon had been destroyed. Has that light beacon been repaired? How does the ministry ensure that navigational warnings also reach coastal fishing boat operators? Mr Chairman, third, P.28 Item 03600 – Dredging Works at Small River Mouths. The allocation for 2027 decreases from RM86.99 million to RM25.10 million, a reduction of about 71 per cent. What is the rationale for such a significant reduction? What is the specific allocation for dredging Kuala Kedah and Kuala Perlis in 2027? I would like to refer back to the answer of the Honourable Minister of Transport on 11 March 2024 regarding the proposal to purchase dredgers to tackle the recurring sedimentation problem. The proposal to re-establish the Marine Department's dredger fleet was also recorded in the Parliamentary Special Select Committee Report D.R. 11/2024.

What is the latest status of that proposal? Has financial approval been obtained, and what are the results of the cost analysis between owning our own dredgers and using contractors on a continuous basis? Mr Chairman, fourth, P.28, Item 07000, Marine Department Office Complex and Equipment Systems. The allocation increases from RM50.43 million to RM106.57 million, an increase of about 111 per cent. I would like

to obtain a breakdown of this allocation, particularly for the modernisation of navigational safety systems. Marine Department records show that there was procurement for the maintenance of radar and VT-MIS systems involving Kuala Kedah, Kuala Perlis and Langkawi in 2026. What is the current operational status of the radar and VT-MIS in Kuala Kedah? Is this system capable of monitoring the movement of small fishing boats that are not equipped with AIS? Is there any plan to upgrade the system through the development allocation in 2027? Mr Chairman, as a summary. I hope the ministry can consider a master plan for small port safety and navigation as a measure to strengthen the safety of ferries, commercial vessels and coastal fishermen in an integrated manner. Kuala Kedah could be among the locations assessed in the implementation of the plan. That concludes my remarks. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Kuala Kedah. I invite the Honourable Member for Jelutong.

Thank you, Madam Chairman. I rise to also take part in the Committee stage on the Ministry of Transport. Perhaps I can begin by referring to Items 030800 – Free Travel Pass for School Students and Persons with Disabilities (OKU), Item 030900 – Unlimited Monthly Pass Incentive, Item 031000 – Pas Mutiara and also Item 031100 – Flight Ticket Subsidy (Flysiswa and Festive Seasons). All these items clearly show that the government has benefited the people from funds collected through taxes. However, I am saddened that the Minister of Transport, who has pioneered all these good measures for the sake of society, for the sake of our people of diverse religions and races, is not present in this august House. Nevertheless, I support his stance because we want to fight, fight corruption and drug addiction. This, this is the principle I support in his stance, but regrettably. I feel sad that he is not here, and I also heard the announcement. I request an explanation. How many beneficiaries from Kelantan and Terengganu have received these benefits? Because I was also hurt recently by a Member of Parliament from the other side making a statement. I

quote, I cite. "The most wicked Muslims, the most evil Muslims who govern the country, are not as cruel as non-Muslims." The Minister of Transport of ours is not a Muslim, from the DAP. He is Chinese, but he has pioneered all these programmes that benefit all the people. [Applause] The Honourable Member for Marang dared to make that statement. I demand here that he should withdraw that statement, and let us look at the results from the sale of vehicle registration, special number plates, particularly the "H" series. This Minister has stated that the government collected, recorded collections of RM91.2 million, and through bidding, through bidding, these funds have been distributed to 53 recipients comprising bus drivers of various religions and races, taxi drivers of various religions and races, and also school bus drivers of various religions and races. [Applause] The Honourable Member for Marang dared to say that non-Muslim leaders are more cruel. This is a statement that is extremely irresponsible. Is there anyone on that side who dares to stand up today to defend Marang's statement?

[Speaking without using the microphone] Amende lah.

Besut, I am not giving way. Don't waste time. Sit down.

Eh, cabar.

Sit down. Don't waste time lah.

This is outside the context, Mr Chairman.

What is this, is it the budget or what?

Duduklah.

What are you talking about?

Is this the budget or what? This is not the budget.

Sit down. [Microphone switched off]

[Dewan riuh]

What point of order?

What? [Microphone switched off]

[Dewan riuh]

What point of order?

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members... [Microphone switched off]

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members...

You must not— you have challenged. Who are you challenging— who stood up?

Sit down, I am not giving you the opportunity. I challenge, I give the opportunity. You, I am not giving you the opportunity, sit down.

Sit down. You, sit down.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Besut.

Regarding what, don't know. What is this debate about?

Deputy Chairman, this... [Microphone switched off]

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Besut. Please sit down, Honourable Besut. Please sit down.

[Dewan riuh]

There is no head in this. What is this problem?

Tuan Cha Kee ChinDAP · PHRasahEN

What you tore— why did you tear it? [Microphone switched off]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members.

[Dewan riuh]

Chairman, I have already given the details.

I would like to state...

Debate... [Microphone switched off]

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Besut. Please sit down. [Microphone switched off]

[Dewan riuh]

Timbalan Pengerusi...

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila gulung.

I would like to state here that the statement issued, the statement issued that interprets non-Muslim leaders as cruel, is a statement that is completely irresponsible, and I request that details be provided regarding how many... [Interjection]

Jelutong, don't talk nonsense, Jelutong.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

That's enough, Honourable Member. [Microphone switched off]

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The Honourable Jelutong's time is up. Honourable Member, please sit down.

[Dewan riuh]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members...

Deputy Chairman, I just want to state that I request the details, how many recipients of all these initiatives are from Kelantan and Terengganu, so that we can prove that the Honourable Minister of Transport, who is not a Muslim, did not act cruelly. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Jelutong. I invite the Honourable Member for Putrajaya.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Thank you, Mr Chairman. Mr Chairman, I am saddened to see us quarrelling among ourselves. Among ourselves, we Malaysians are quarrelling. Are we aware that millions out there are not citizens who live in this country illegally? Refugees are scattered throughout every corner of this country. That is why I want to touch on Item 020300 – Road Transport. The people down below often complain that many foreign workers without permits and refugees drive cars, drive vehicles, ride motorcycles without licences, and when accidents happen, it is our citizens who become the victims. I share data from the written reply of the Ministry of Transport for the period January to August 2026: 133,081 summonses for various traffic offences have been issued to foreigners in total. 21,232 offences of having no Competent Driving Licence (CDL)— 1,933 offences of having no GDL driving licence

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

or carrying goods, and 85 offences of having no PSV licence or driving a public service vehicle. 83 cases— 85 cases they can drive passenger vehicles without a licence. 1,933 cases can drive vehicles without a licence, goods vehicles. What is actually happening? Therefore, that is why I say we need to look at this matter more deeply. We quarrel a lot among ourselves, who are truly Malaysian citizens, truly Malaysian nationals, while we are facing various challenges that we turn a blind eye to. So, I request the Ministry of Transport to look into this matter, to cooperate with the police, to cooperate with all the relevant agencies.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Do not allow this matter to continue. Why? When accidents happen, these people do not have insurance. They do not have licences. To obtain compensation for repairing vehicles, if injuries occur, what happens? I request the government, the ministry, to list and detail what actions have been taken against these people, because I have been informed that they will be charged in court. How many cases have been charged in court for this matter? And I request once again that this matter be given attention and appropriate action be taken. Carry out large-scale operations. We must send a signal. Otherwise, Mr Chairman, in Putrajaya here, those riding motorcycles everywhere, whether they have licences or not, I don't know. Those driving cars and so on, but we— if I as a Member of Parliament could detain people, I think I would be working detaining people every day, but we have no power. That is why the authorities must take action. Next, 020100, 030900 and 600000. Mr Chairman, the government spends billions of Ringgit to provide public transport networks. MRT, LRT, ERL, monorail and so on. For example, the government has spent RM39 billion on MRT 2. Today, based on the study and data I have, if I am wrong, correct me— today, the utilisation rate of MRT 2 is 35.8 per cent of its intended capacity. We spent RM39 billion, the utilisation capacity is only 35.8 per cent. What did we spend it on? That is why even in the Cabinet I raised the same issue. Do not be complacent about spending billions of Ringgit when it is not being used.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Let us look at the expenditure for MRT 3. MRT 3 costs RM50 billion. Let us look at LRT Penang, RM16.8 billion. We build, keep building, keep building, but we do not look seriously at how we should ensure that the level of utilisation can be increased. If I may share, let us look at the issues out there, how our trains are too crowded during peak hours. Passengers have to wait for one after another train, several times they cannot even board a train. How many technical disruptions of broken-down trains have occurred. Many arrive late at work. They do not have buses to go to the feeder bus to go to the station, the feeder bus is late. These various issues have placed pressure on users. So, I would like to raise here, if we look at all these many factors, why is utilisation low? One of the factors causing low utilisation is because of users' trust and confidence in the LRT and MRT systems...

Mr Chairman (Puan Alice Lau Kiong Yieng)

Terima kasih.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

That means they know that the system is not reliable. If they want to go, they may arrive at work late. So, I request that the government give priority to efforts to increase this utilisation, rather than efforts to keep building LRTs. As for MRT, I want the last point, Mr Chairman. If MRT 2 in densely populated areas, in the areas of Kuala Lumpur, Selangor and Putrajaya, has ridership or utilisation of only 35.8 per cent, what will the utilisation in Penang be, because its population and population density are much lower? Thank you, Mr Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Putrajaya. I invite the Honourable Member for Penampang.

Datuk Ewon BenedickUPKO · PHPenampangEN

Thank you, the respected Chairman. First, I would like to express my respect to the former Minister of Transport who was reported to have decided to resign on principle. [Applause] I believe that those who have made the same decision are holding to their respective principles and are not playing to the gallery.

Datuk Ewon BenedickUPKO · PHPenampangEN

I must express my appreciation to him for initiating the FLYsiswa initiative, which is a subsidy assistance scheme for the purchase of airline tickets for students of public higher education institutions. Under Item 031100 – Airfare Subsidy (FLYsiswa and Festive Seasons), an allocation of RM48 million has been provided. I hope the FLYsiswa initiative can be continued with an appropriate allocation as a counterpart to the toll discount initiative, which also involves government allocation. I also propose that the FLYsiswa initiative be expanded, including funding additional flights beyond the existing flight schedules to Sabah and Sarawak during peak seasons such as Christmas, Hari Raya Puasa, Chinese New Year, Keamatan and Gawai. I also appreciate the initiative of the former Minister of Transport in introducing the BAS.MY service or the pink bus in KK City. Hopefully this initiative can be extended to Sabah. Chairman, under Item 07900 – Repair and Construction of Jetties in Sabah, an allocation of RM10 million has been provided. I would like to ask the ministry, where are the jetties that will be built in Sabah? Under Item 01100 – Railway Extension to Port, an allocation of RM18.108 million has been provided. I would like to ask, where is this project being implemented? And I also would like to ask about the ministry's policy and initiatives should there be a proposal to build a railway to Sepanggar Port in Sabah. Can the ministry provide the same allocation? I also welcome the feasibility study that has been carried out by the ministry on the proposed Trans-Borneo Railway. I hope the study can be presented to the Sabah State Cabinet and that the related follow-up discussions can be elaborated. I hope this proposal can be included in the Mid-Term Review of the Thirteenth Malaysia Plan (RMK13) so that it can be commenced. Honourable Chairman, I also welcome the allocation provided for the expansion of KK Airport and also Tawau Airport. I hope this airport expansion project can be followed by better services and facilities for clearance counters, and I also hope the cargo handling facilities at KKIA at Kota Kinabalu Airport can be upgraded in line with the increasing needs.

Datuk Ewon BenedickUPKO · PHPenampangEN

I also propose that the ministry work together with the Sabah State Government to conduct a more detailed study on the need for a new airport in Sabah, including in Lahad Datu, to drive the proposed Special Economic Zone. Chairman, under Item 020400 – Commercial Vehicle Licensing Board (LPKP) Sabah, an allocation of RM5.888 million has been provided. I propose that the ministry increase the service personnel of LPKP Sabah, especially in the enforcement division. I also hope that enforcement laws on commercial vehicles can be standardised by imposing compounds on companies, rather than on the vehicle units owned by transport companies. I also propose that the ministry take the lead in developing an integrated control centre and enforcement of laws related to commercial transport, including those involving the role of local authorities. Chairman, in making new laws, amendments or refinement of laws relating to maritime and shipping, as is currently being implemented. The ministry should take into account the need to obtain the agreement of the Sabah State Government before such new laws or amendments to those laws are brought to this House, as stipulated in Article 161E of the Federal Constitution. I hope this is the spirit that we want to make succeed in building this nation together, based on the Malaysia Agreement 1963. Honourable Chairman, that is all. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Member for Penampang. Now I invite the Honourable Deputy Minister of Transport to respond. Time allocated is 25 minutes.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

Thank you to all the Honourable Members who have debated at the Committee Stage. So, Chairman, these answers are quite thick, yes, and many of them overlap, yes. So, I will read out those that I can, and the remainder will probably be given in writing, yes.

Datuk Haji Hasbi bin Haji HabibollahPBB · GPSDeputy Minister of Transport · LimbangEN

So, for the simplest question that was asked, the last one, the Trans-Borneo Railway is now going to be brought to the Cabinet. That is one answer. Later, whatever the Cabinet decides, then we go into detail, okay.

Thank you, Minister.

The simple one, the simple one.

Datuk Ewon BenedickUPKO · PHPenampangEN

So, I invite the additional question from the Honourable Deputy Member.

No need, no need.

Datuk Ewon BenedickUPKO · PHPenampangEN

Will the Sabah and Sarawak State Cabinets be in...

Federal Cabinet first.

Datuk Ewon BenedickUPKO · PHPenampang

Federal dulu?

Federal Cabinet first, yes.

Datuk Ewon BenedickUPKO · PHPenampang

Terima kasih.

Ha, that's the quick win. [Laughter] So, first of all, I would like to record my highest appreciation to all the Honourable Members who took part in the debate session. For the Honourable Member's information, the ministry received a total allocation of RM7.07 billion in Budget 2027, RM1.67 billion for operating expenditure and RM5.4 billion for development expenditure. We have immediately taken note of the views, criticisms and proposals raised, which reflect everyone's concern for efforts to strengthen the country's transport system. This evening I will respond to and elaborate on several key matters raised in this debate. Firstly, it concerns the collection of revenue by the Road Transport Department and the suspension of the services of the MyEG collection agent. I shall begin with the issue of revenue collection by the Road Transport Department (JPJ) and the suspension of the revenue collection agent services of MyEG Sendirian Berhad and Zetrix AI Berhad, formerly known as MyEG Services Berhad, which was raised by the Honourable Member for Bagan Serai, the Honourable Member for Jerantut, the Honourable Member for Tenggara, and I think a few others too, although their questions were not in depth. At the initial stage, when the government issued reminder letters, the company made several commitments to settle the outstanding revenue collections owed to the government. The extension of time was granted by taking into account that

the company was still providing services and the government did not want those services to be disrupted. This includes the facility for online payment of summonses by foreign nationals at the Malaysia-Singapore Border checkpoint as well as the computerised theory test centre services in Sabah and Sarawak. Meanwhile, the full implementation of e-testing is expected to be available by 2028. As of 30 September 2026, MyEG handled 61.16 per cent of collections through collection agents and 13.27 per cent of total JPJ revenue collections. All these transactions were also taken into account in providing alternative channels. For the information of the Honourable Members, Zetrix AI Berhad, through a letter dated 5 November 2026 to the Ministry of Transport, submitted a proposal for an alternative settlement of the outstanding payments. The proposal includes an advance payment of RM100 million before the company is reappointed to carry out revenue collection services on behalf of the Road Transport Department. Meanwhile, the remaining outstanding balance of RM214 million will be fully settled within six months through six equal monthly instalments totalling RM35.67 million. This proposed settlement was submitted to the Ministry of Finance through the Ministry of Transport's letter dated 10 November 2026 for further direction. The total penalty imposed is RM29 million based on the terms and conditions of the agreement. In the meantime, the Ministry of Transport and JPJ have given full cooperation to the investigations carried out by the Royal Malaysia Police and the Malaysian Anti-Corruption Commission (SPRM) in relation to this matter. In addition, the Legal Advisor's Office, Ministry of Transport, is taking action to issue a notice of claim to the company concerned. If no payment is settled within the stipulated period, court action will proceed after consultation with the Attorney General's Chambers. However, the issuance of the notice of claim and the court action will not be pursued if the proposed settlement of the outstanding payments by Zetrix AI is agreed to by the government. Next is what was raised by the Honourable Member for Bagan Serai regarding e-hailing and p-hailing and the security system for e-hailing services, yes. The commission structure and fare rates for e-hailing services are currently determined by the e-hailing operators based on their respective business models and market mechanisms. Fare rates generally take into account

factors such as travel distance, travel duration, current demand, namely dynamic pricing, and operating costs. As for commissions, these form part of the commercial terms between the e-hailing operators and the driver partners. The Ministry of Transport, through the agency APAD, has set the maximum commission rate for e-hailing services at not exceeding 20 per cent for private vehicles and 10 per cent for taxis, rental cars, airport taxis and luxury taxis, in line with SPAD guidelines, Number 2, 2018, and the 2024 service level requirements for e-hailing vehicle intermediary business licences. However, e-hailing platform providers, including GrabCar Sendirian Berhad (Grab), have proposed a more flexible fare structure with a more dynamic commission rate, subject to a weekly or monthly average cap not exceeding 20 per cent. In this regard, the government has approved the implementation of a proof of concept (POC), the grab service fee (GSF), to assess the effectiveness of such a structure that takes into account factors of distance, location and travel duration as well as the movement of drivers between drop-off and pick-up locations. This is still in the Proof of Concept, yes. As of 31 May 2026, a total of 170,944 driver partners had opted to join this GSF POC, with an average GSF rate of 18 per cent and an effective rate of 15 per cent. This implementation also recorded an increase in income per minute of transit exceeding 66 per cent compared with before participation. However, the government has taken note of the drivers' concerns regarding commission rates and will continue to examine this issue to ensure the welfare and interests of e-hailing drivers are protected.

The government also consistently holds engagement sessions with e-hailing operators and driver representatives to obtain feedback on commission structure issues, fare rates and driver welfare. Any proposals for improvement will be considered thoroughly, taking into account the balance between industry sustainability, driver welfare and consumer affordability. For the information of the YB for Putatan, who asked about the security system of e-hailing services, licensed e-hailing platform companies under APAD must ensure that all the following application functions operate properly

throughout the validity period of the licence. This includes the emergency function that connects directly to the emergency call number 999 and notifies the licence holder's emergency system as well as the numbers selected by drivers and passengers, such as family members. This obligation is specifically stated in Part I – Minimum Application Specifications, paragraph 1(h) in the special conditions of the 2024 Service Level Requirements for E-Hailing Vehicle Intermediary Business Licence. Regarding the purchase of rolling stock and capacity enhancement of Keretapi Tanah...

Minister, Minister, one question. One question about Zetrix just now. May I? Okay, the question is regarding Zetrix just now. I heard the answer from the Deputy Minister earlier saying that the ministry will extend the Zetrix contract to ensure that it repays the debt. What is the administrative innovation made by MOT in imposing penalty consequence management on Zetrix?

Right now it has been submitted to the Ministry of Finance to examine this proposal. That is what I can answer first. Later we will see what the decision of the Ministry of Finance is. Okay, next is regarding the purchase of rolling stock and capacity enhancement of Keretapi Tanah Melayu Berhad (KTMB). This was raised by the Honourable Member for Bakri and the Honourable Member for Jerantut. The Ministry of Transport takes note of the concerns of the Honourable Member for Bakri regarding the restructuring of ETS services on the JB Sentral–Padang Besar route starting 1 January 2027, and the Honourable Member for Jerantut regarding job security for KTMB staff, especially technical workers, following the proposal to implement non-core activities by external parties. For the information of the Honourable Member for Bakri, the restructuring of ETS service schedules by KTMB aims to optimise the use of trains and to increase the frequency and capacity of services. Through this restructuring, the overall frequency of ETS services will be increased from 44 to 58 trips a day, including an increase in JB Sentral–KL Sentral services from 16 trips to 18 trips a day. Although the service that continues to use the same train on the JB Sentral–Padang Besar route is no longer offered, passengers can still continue their journey by changing trains at KL Sentral. KTMB has also

implemented improvements to the ticket booking system to enable the purchase of connecting journey tickets through a single transaction. However, the ministry takes note of the Honourable Member's proposal that the direct service be retained and will examine this matter together with KTMB, taking into account passenger demand, the suitability of travel schedules, and the need to ensure comfortable use so that consumers are not affected.

Regarding the concerns of the Honourable Member for Jerantut about job security for KTMB staff, any proposal to restructure KTMB's operational activities must take into account aspects of operational efficiency, the need for technical expertise, implementation costs, and the welfare and interests of existing workers. The government also recognises the experience and expertise possessed by KTMB staff in ensuring the continuity of the country's railway services. Accordingly, any changes to the method of implementing these activities must be thoroughly examined, including their implications for the position of workers, to ensure operational improvements can be implemented without neglecting the welfare of the staff involved, insya-Allah. The Honourable Member for Setiu, regarding...

Yang Berhormat.

Membangkitkan tentang...

Honourable Deputy Minister. Regarding the ETS route from Padang Besar to JB Sentral. The Honourable Deputy Minister just mentioned one transaction for everyone, even though it involves a train change at KL Sentral. The issue I asked about earlier is, if the first train is late, what about the second train? Will they get a new ticket or a guarantee to continue? Second, the readiness of KL Sentral terminal to accommodate transit passengers? Those are my two questions, thank you, Honourable Deputy Minister.

That question is very detailed, Honourable Member. So, I take note of the question. I don't have the answer-lah, how to overcome certain situations like these. We will answer in writing later. We take note on that.

Regarding what was raised by the Honourable Member for Setiu on the ECRL B40 Family Package fare and the Honourable Member for Jerantut on the construction cost of the East Coast Rail Link (ECRL) Project. The Ministry of Transport takes note of the Honourable Member's concerns regarding fare rates, particularly from the aspect of public affordability and low-income groups. Special fares for groups registered under eKasih and recipients of the RAHMAH Cash Aid (STR) currently have no specific fare rate finalised for these groups. However, the government has provided a fare discount of 50 per cent for senior citizens, persons with disabilities (OKU) and children, and 40 per cent for students. Regarding the proposal for a family fare package, the government notes and will consider the proposal. As for the proposal for a maximum fare cap during the festive season, this matter can also be examined by taking into account the implementation of a dynamic fare mechanism based on demand, capacity and the timing of ticket purchases later, insya-Allah. It should also be clarified that ECRL is an additional transport alternative for the public apart from buses, aeroplanes and private vehicles. ECRL also offers express and transit service options with different fare rates and travel durations. Express services offer shorter travel times, while transit provides a lower fare option. This gives flexibility to users to choose services according to their affordability and respective needs. The government will continue to ensure that the ECRL fare structure takes into account the interests of users so that this service remains a competitive and affordable transport option. In addition, the Honourable Member for Jerantut asked about the total cost of the ECRL route project, which covers several cost components, among them construction costs, interest during construction (IDC), land acquisition costs, cancellation and suspension costs of the project, and operating costs. For the information of the Honourable Member, the construction cost of the ECRL project for the 665-kilometre alignment from Kota Bharu to Port Klang is RM52.43 billion. The project is financed through several sources, including term loans from China EXIM Bank, Sukuk Malaysia Rail Link's Sdn. Bhd.

Development Allocation of the Ministry of Transport and financing by the Ministry of Finance. Regarding the repayment of loans raised by the Honourable Members, the commitment is implemented based on the agreed terms and financing schedule. The government will ensure that loan repayment requirements are taken into account in the national financial planning, taking into account fiscal capacity and other government financial commitments. Repayment of the project's development loan is not wholly dependent on ECRL's operating revenue, but is instead managed based on the financing structure that has been determined to ensure financial obligations can be met in a planned manner. From the business model aspect, ECRL is expected to generate income through passenger services and freight transport based on the consultant's study in 2025. Passenger service revenue is projected at RM192 million in 2027, RM198 million in 2028 and RM204 million in 2029. Meanwhile, freight service revenue is projected at RM68 million in 2027, RM71 million in 2028 and RM214 million in 2029, in line with the phased opening of the alignment and freight facilities. In the long term, freight services are expected to become the main contributor to ECRL's revenue, with a target of around 70 per cent of revenue from freight and 30 per cent from passengers once operations reach a more mature level. In addition, ECRL Operation Sdn. Bhd., as the operator, will also optimise non-fare revenue sources through commercial activities such as space leasing, advertising and related activities to strengthen the sustainability of ECRL operations.

Menteri...

The revenue generated through passenger services, cargo and commercial activities will be used to support the operational and maintenance needs of the ECRL services. Yes, Jelutong.

Minister, I have asked for details— I have touched on the free travel passes for school students and OKU, the unlimited monthly My50 pass incentive, the mutiara pass, ticket subsidies

for flights— how much allocation has been given to Kelantan, particularly Terengganu, which has benefited from this Ministry of Transport programme pioneered by the Minister of Transport.

Okey YB Jelutong. I will give that figure, pecahan itulah in writing. Pada masa yang sama...

Minister, I apologise. I asked, I asked because I— I really feel this matter needs to be explained in this august House. We need to know, especially Kelantan and Terengganu, because the people of Kelantan and Terengganu in particular have received benefits from these programmes. And these programmes have— not only this, how many bus owners, taxi operators, school bus operators, rental car operators have received funds from the Ministry of Transport as a result of what the Minister of Transport has thought of. I want an explanation, the House needs to know, the people need to know. Especially when there are accusations from the Honourable Member from Kelantan and Terengganu saying that non-Muslim leaders are oppressive. I request an explanation. I apologise. I do not want any written explanation. I want the matter to be disclosed so that the people in our country know. What has the Ministry done. The Ministry led by the Honourable Member from DAP, the Party's Secretary-General who resigned because we fight corruption. Not like those on that side.

Rude. What do you mean "that side"? Why are you being so rude? [Microphone switched off]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members, please sit down. Let the Deputy Minister answer. Anyone who stands up without permission...

I also don't want to entertain the Deputy Chairman.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sila keluar.

This person is crazy.

Jelutong is even crazier. [Microphone switched off]

[Speaking without using the microphone] Jelutong is even crazier in this House. He is even crazier.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Teruskan.

Okey YB Jelutong. We will give you in writing. Because we don't have the figures right now. Pecahan-pecahan itu terperinci. Ini, ini, ini kan. So, we will give you.

But many have received it.

Definitely. It's true, One Malaysia received it. One Malaysia received it.

Thank you, Deputy Minister.

One Malaysia received it, not only Kelantan and Terengganu. What's the problem here?

At the same time— okay Chairman, I'll continue.

No need to entertain crazy people lah.

He's crazy lah, Jelutong. Really crazy! [Microphone switched off]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Members, if you cannot give your attention to the Honourable Deputy Minister, you may leave.

Keluar, keluar.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Continue, Honourable Member.

I'll continue, alright. Okay, calm down, calm down. At the same time, the government also views the ECRL as a long-term strategic infrastructure investment whose benefits are not limited merely to direct financial returns. The project is expected to generate economic spillover effects through increased trading activity, development of industrial areas (TOD), attraction of new investment, and strengthening of logistics links between the East Coast and West Coast, including Kuantan Port and Port Klang. Insya-Allah, all of this will become a multiplier effect, to provide returns and also to recover the construction costs of this ECRL.

Next is the matter concerning the electric train service (ETS). For the information of the Honourable Padang Rengas, the government is considering a proposal to procure 42 passenger train sets through a government-to-government (G2G) leasing method between the Government of Malaysia and the Government of the People's Republic of China through the establishment of a joint venture company. Of this total, 28 sets of electric multiple unit (EMU) trains are proposed for the KTM Komuter service, while the remaining 14 sets are for the electric train service (ETS). For the KTM Komuter service, 14 sets are allocated for the southern sector and the other 14 sets for the Klang Valley sector. To meet the needs of the northern sector KTM Komuter service, the government has separately implemented the procurement of 12 sets of 3CSEMU trains using development expenditure allocation, namely DE, which are scheduled to begin delivery in February 2027. However, the proposal to implement the G2G leasing model for the 42 train sets is still under further study and consideration between the Ministry of Transport and the Ministry of Finance. Regarding the proposal to extend the KTM Komuter service to Perak, this matter can be further examined by taking into account the service capacity requirements of the trains and KTMB's operational planning. Regarding bus.my, this is the pink bus. For the information of the Honourable Members, yes, it is not just one, there are two or three from Sabah who raised the same matter, the Honourable Setiu, and the Honourable Penampang too. The stop-and-go bus service transformation programme, or SBST, under the bus.my brand operates in the Kuala Terengganu area through nine main routes operated using 27 buses. The route closest to Kampung Mangkuk is route T10 from Kuala Terengganu to Jeti Merang, operated using four buses with a travel distance of 43.3 kilometres inbound and recording an average of 139 passengers a day...

Datuk Dr. Radzi JidinBERSATU · PNPutrajaya

[Bangun]

To complete the coverage of the said transport services, there are also stop-and-go bus services under the Special Interim Assistance Fund Programme – Stop-and-Go Bus Interim Assistance Fund Programme: Interim Stage Bus Support Funds (ISBSF) from Kuala

Terengganu to Kuala Besut, Terengganu, which passes through the area near Kampung Mangkuk, Setiu. The area is the Penarik Roundabout near the Penarik Police Station, estimated to be three kilometres from Kampung Mangkuk, Setiu. The route for the said ISBSF Programme has an average load factor (ridership) of three passengers a day— three passengers a day for one route only.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Deputy Minister, please wind up.

So, this is something that needs to be considered lah.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

May I, Honourable Minister, just a little.

Mr Chairman (Puan Alice Lau Kiong Yieng)

Sikit.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

Just a little, yes.

Pengerusi.

Datuk Dr. Radzi JidinBERSATU · PNPutrajayaEN

I, regarding the route just now, three passengers a day. I raise this matter in the context of the MRT. Ridership is 38.5 per cent, and we have spent tens of billions. The problems the people face now are trains breaking down, overcrowding and so on. It has never been resolved. So, what immediate solution will the government take? If not, the trust or confidence of the people in the MRT and LRT systems will continue to decline. Even fewer people will use them. So, what out-of-the-box approach will the government implement? Thank you.

That's all, Honourable Member, thank you.

Chairman, a little on Setiu. I raise the need to provide bus.my for the future. In the future there will be a clinic, Setiu will become more advanced with the completion of the Sungai Mangkuk estuary conservation project, and more tourists will want to go to Pulang Gadang. So, perhaps services already exist, but they are insufficient and the frequency is too sparse for too long. Second, the issue of the students just now. The students just now have no bus facilities to go to school. One more thing, Chairman, that I want to mention. Recently, in the Minister's winding-up speech, on 27 October recently, the Minister mentioned that

the ECRL stations have selected stations that will be chosen for bus.my services. I want to ask, is Setiu included? That's all, thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Honourable Deputy Minister, please answer and wind up. Time is up.

I— my head just now was over there, Madam Chairman, what do you say just now? Sorry.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Answer and wind up. Time is up.

Regarding these many questions in detail, that is what is difficult for us to give the answers directly. So, insya-Allah, yes, the answers that I have not yet given, we have prepared, all the details are in this. And regarding what was raised by Putrajaya just now about— yes, of course the expenditure to build is large, but I think the government's planning is not only this, this is in the long run. In that regard, of course our government these days is certainly about promoting— how to promote the use of these public services. In our road to rail programme, one of the programmes includes how to increase the number of passengers who will use rail services and also other public transport services. And in terms of these breakdowns, it is acknowledged, yes there are, but we always look at these matters, and they are indeed repaired. Indeed, we do agree, sometimes people worry about whether reliability is in question. Can I get to work on time? Can I rely on this service? Of course, but insya-Allah, I think with the very large expenditure that the government has invested in building this rail transport for public use, of course we will not let it be just like that. Of course we will improve, ensure that all breakdowns, all disruptions must be overcome. Because our purpose is nothing else. With such a large investment, it is certainly for the use of the people in our programme, especially under the major agenda programme, road to rail. That includes, not only about moving cargo, use of rail, but also under the use of public transport itself. So I think, I cannot give everything. So, whatever has been raised in detail, insya-Allah, as thick as this, we will make sure to give—

to all the Honourable Members who have raised the matters raised earlier. In addition, there are also proposals and suggestions that have been given, I think this is something we would like to— don't worry, insya-Allah it will not simply be lost, we will take note. The ministry will make sure to study the good, substantive proposals that can improve the services in our country's transport sector. Thank you.

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

Thank you, Honourable Deputy Minister of Transport. Honourable Members, the question is that the sum of RM1,673,604,200 for Head B.28 Operating Expenditure Estimates 2027 forming part of the Schedule be agreed to. [Question put and agreed to] [Head B.28 became part of the Schedule]

Mr Chairman (Puan Alice Lau Kiong Yieng)EN

The question is that the expenditure stated in Head P.28 in the Development Expenditure Estimates 2027 be approved. [Question put and agreed to] [Head P.28 became part of the Estimates] [The House resumed] [Deputy Speaker (Puan Alice Lau Kiong Yieng) in the Chair

Deputy Speaker (Madam Alice Lau Kiong Yieng)EN

Honourable Members, today's sitting of the House is adjourned until 10 a.m. on Tuesday, 17 November 2026.

[The House adjourned at 7.30 p.m.]