Johor · 30 June 2019
2nd session, 1st meeting · 199 turns · 30,180 words · official PDF ↗
ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.
Announcement from the Honourable Speaker.
Bismillahirahmanirrahim. Assalamualaikum warahmatullah. (Recitation of selawat).
Honourable Members, all praise is due to Allah SWT, for by His grace the Official Opening Ceremony of the Second Meeting of the Fourteenth Session of the Johor State Legislative Assembly (Dewan Negeri Johor) has been completed, presided over by His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang DiPertuan Bagi Negeri dan Jajahan Takluk Johor Darul Ta'zim, on Thursday, 27 June 2019.
With this, the Members of the State Legislative Assembly humbly offer their most sincere thanks for His Royal Highness's gracious attendance at the Assembly today to officiate at the Opening of the Second Meeting of the Fourteenth Session of the Johor State Legislative Assembly.
Honourable Members, this House humbly extends its warmest congratulations and best wishes to His Highness Major General Tunku Ismail Ibni Sultan Ibrahim, Tunku Mahkota Johor, on the occasion of His Highness's 35th birthday on 30 June 2019.
Honourable Members, this House also extends its warmest congratulations to the Honourable Menteri Besar, who was conferred the Darjah Sultan Ibrahim Johor Yang Amat Disanjungi, Second Class, with the title Dato' Mulia Sultan Ibrahim Johor (DMIJ), bearing the title Dato' on 22 April 2019.
I also take this opportunity, during this month of Syawal, to extend Selamat Hari Raya Maaf Zahir Batin.
Tabling of Meeting Paper.
Honourable Mr Speaker, I respectfully request to table Meeting Papers Nos. 21 to 24 of 2019.
Meeting Paper No. 21 of 2019 - First Supplementary Estimates of Expenditure for 2019.
Meeting Paper No. 22 of 2019 - First Supplementary Development Estimates for 2019.
Meeting Paper No. 23 of 2019 - Annual Report of Johor Corporation for 2018.
Meeting Paper No. 24 of 2019 - Resolution to Establish an Account under Section 10, Financial Procedure Act 1957 (Act 61) for the Purposes of the Sukan Malaysia (SUKMA) Johor State Games.
Honourable Mr Speaker, I respectfully request to table Meeting Papers Nos. 25 and 26 of 2019.
Meeting Paper No. 25 of 2019 - Financial Statements of the Mersing District Council (Majlis Daerah Mersing) for the Year Ended
31 December 2017.
Meeting Paper No. 26 of 2019 - Financial Statements of the Labis District Council (Majlis Daerah Labis) for the Year Ended
31 December 2017.
Honourable Mr Speaker, I respectfully request to table Meeting Paper No. 27 of 2019.
Meeting Paper No. 27 of 2019 - Financial Statements of the Johor Islamic Corporation (Perbadanan Islam Johor) for the Year Ended
31 December 2017.
Oral Questions.Questions
The Honourable Mahkota, please proceed.
Honourable Mr Speaker, Question No. 1.
Is there any plan to convert the Temporary Title to Permanent Title for land in settlement areas owned by bumiputera, in order to increase property value and enhance its use?
The Honourable Tangkak, please proceed.
Honourable Mr Speaker, my Question No. 2.
What is the policy of the Johor State Government on granting ownership of state land to the people, and will temporary ownership of cultivated state land be permitted to be converted into permanent ownership?
Please proceed, Honourable Member.
Bismillahirahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, allow me to answer the question of the Honourable Mahkota and subsequently the question of the Honourable Tangkak together, concerning the status of registration of final titles and also the efforts of the State Government to grant permanent titles over temporarily held land.
The provisions of Section 189 of the Kanun Tanah Negara state that any land held under a temporary title that has been properly surveyed may, in accordance with the provisions of Section 396 KTN, be issued a final title as a continuation of the temporary title.
Procedurally, the Johor Land Administration (Pentadbiran Tanah Johor) carries out the conversion of a temporary title to a final title immediately upon receiving the endorsed plan in the form of Form B1, Schedule 14 KTN, from the State Surveyor-General, Department of Survey and Mapping Malaysia (JUPEM), whereby the final title will be registered in place of the temporary title and the temporary title ceases to be valid.
Next, I wish to explain that, in principle, the granting of ownership of any State land should not exceed a period of 99 years, as provided under Section 76(a) of the Kanun Tanah Negara 1965. Legally, the granting of ownership of land by the State Authority for the purpose of applying for permanent tenure, as provided under Section 76(aa)(iii), may be considered by the State Authority when the State Authority is satisfied that special circumstances exist.
The 64th National Land Council has established several practices as the policy for granting land in perpetuity under special circumstances in accordance with Section 76(aa) KTN. These have been clearly translated for the reference of the State Authority through circular KPTG No. (1) 2011 (Guidelines for the Implementation of the Policy on Granting New Tenure Not Exceeding 99 Years for Titled Land with State Leasehold and Mukim Leasehold Status), which among other things stipulates that:
1. Grant of State land for permanent tenure may be considered for applied-for State land of enclave nature which will subsequently be consolidated with adjoining land held in perpetuity and owned by the same landowner.
2. Grant in permanent form also applies to land which was originally held in perpetuity but was subsequently surrendered to the Government and returned to the original landowner through the Serah Balik Kurnia Semula (SBKS) process. This refers to the grant of State land for permanent tenure through the special provisions under Part 12 of the Kanun Tanah Negara 1965, surrender and re-grant, or, for the State of Johor, through the SBKS process under Section 197 read together with Section 76 of the Kanun Tanah Negara.
3. Grant in cases where the Government acquires land held in perpetuity under the Land Acquisition (PBT) Act 1960 but the Government does not require the land and it must be re-granted to the original landowner, it is considered fair for the land to be granted for perpetuity.
For the information of the Honourable Members, in efforts to enhance the well-being of the people in the State of Johor, the Pakatan Harapan manifesto during the 14th General Election committed, among other things, to granting 99-year leasehold status for Kampung Melayu, traditional villages, organised villages and new villages.
I would like to state, from the perspective of property valuation, that this 99-year tenure may, with permission, be described as "as good as freehold". Furthermore, the Kanun Tanah Negara (Amendment) Act 2016 added Section 90(a), which allows landowners to apply for an extension of the tenure period at any time before the tenure expires, for consideration by the State Authority.
At present, in line with the provisions under the Johor Land Rules 1966 (Amendment) 2004, the State Government, when considering applications for land grants, will offer successful applicants a 99-year tenure for agricultural land and give them a choice or option for residential land.
A person granted land for a residential house site is given the option of choosing a tenure period of 60 years or 99 years, with the premium imposed based on the chosen period. This shows that the Government gives individuals the opportunity to own land with a 60-year or 99-year tenure according to their respective capabilities. Therefore, community leaders should encourage successful grantees to pay the land premium within the stipulated period, because the payment imposed is very low compared with the market value of the land. Thank you.
The Honourable Mahkota.
Thank you, Mr Chairman. My supplementary question: what was the total area of Malay reserve land in 2017, 2018 and 2019? Has there been an increase in the total Malay reserve land since Pakatan Harapan took over the state government?
Please proceed, Honourable Menteri Besar.
Thank you. Honourable Dato' Speaker... Honourable Mr Speaker, for the information of this distinguished House, the Johor State Government is very committed to safeguarding the interests of the Bumiputera, even though the state administration is now under the Pakatan Harapan Government. The State Government continues to strive to ensure that Malay reserve land is protected, because this matter is very important in safeguarding the rights of the Malays, as enshrined in the Federal Constitution, particularly in the fields of land, real estate and housing. According to the records I have, up to April 2019, the increase in the total area of Malay reserve land since Pakatan Harapan took over the leadership of Johor is 230.24 hectares. This brings the total area of Malay reserve land to 557,518 hectares, compared with 557,287 hectares in December 2018. The District of Kulai recorded the highest increase in the area of Malay reserve land, at 75.64 hectares, followed by Kota Tinggi at 49.35 hectares and Pengerang at 34.54 hectares. Although Johor is the choice of domestic and foreign investors to come to this state, the State Government is aware of the importance of preserving and ensuring that Malay reserve land remains a priority of the State Government. Thank you.
Ya, Tangkak.
Thank you, Honourable Mr Speaker. Thank you to the Honourable Menteri Besar for the answer.
Firstly, I would like to extend my congratulations and thanks to the Johor State Government because during the first year of the state administration, it allowed what is called a relaxation for, in particular, holders of land titles in Johor, so that they can renew the tenure at any time and according to its conditions, namely that once they, or when the landholder wishes to extend the tenure, the KPTG circular (1) of 2011 is applied, which determines the premium imposed according to that circular for residential purposes, the residential category, namely 15% of the market price for those who wish to extend up to 60 years, and 30% of the market price for those who wish to extend to 99 years. However, is the State Government going to review, especially for residential landholders, so that they can extend the period of land tenure at a lower rate or premium? My question is, will the State Government review it? Thank you.
Please proceed, Honourable Menteri Besar. Mahkota, please switch off. Okay.
Thank you, the Honourable Tangkak. The State Government is always aware of the amount imposed, and God willing, the State Government will continually monitor the amount of premium imposed, and if there are any changes, the State Government will conduct a study to make a change, whether the premium needs to be increased or decreased. Thank you.
Next question. Please proceed, the Honourable Machap.
Honourable Mr Speaker, Question No. 3.
What are the latest measures taken to ensure that the rate of truancy from classes and school is decreasing in the State of Johor?
Please proceed, the Honourable EXCO. Pekan Nanas, please switch off.
Assalamualaikum warahmatullahi wabarakatuh. Thank you to the Honourable Mr Speaker. I am answering the question from Machap: What are the latest measures taken to ensure that the rate of truancy from classes and school is decreasing in the State of Johor. Especially to the Honourable Speaker and also Machap, we are well aware that there are factors behind truancy. If we can identify the factors of truancy, God willing, the schools and also the education department will manage and help. Among the important matters for us to note, truancy occurs due to several matters, among them the e-group environment among the students involved, where the group is sometimes not just one or two persons but more than three or four people.
Secondly, perhaps because of part-time work at night, which causes them to be sleepy, wake up late in the morning and therefore cannot go to school. Thirdly, there are also family problems; troubled parents cause the children to be uncontrolled, and this causes these children to be neglected and not come to school. Fourthly, perhaps there is the problem of homework not completed, being afraid to come to school, so these factors also cause students to play truant.
Therefore, based on the four factors I have stated, Alhamdulillah, at the Ministry level as well as at the school level itself or the Education Department, the first and foremost role has been played by holding counselling sessions, guidance and counselling involving guidance and counselling teachers, where students with problems are called in and recorded, and entered into the e-counselling record data of schools in the State of Johor. Looking at the total truancy across the whole State of Johor, which is 3,992 cases, if we look at the number it appears large, but when it is added up and compared with the total number of students from Standard One to Form Six, it is actually a fairly small percentage. Of the 3,992 truancy cases, we have been able to resolve 298. Alhamdulillah, the behavioural changes of the students who played truant can be controlled, and this change gives us confidence that when we can identify the causes and problems of students, God willing, the truancy that occurs can be eradicated, controlled or improved.
The second matter, the department is also based on the implementation of the launch of the Ziarah Cakna Programme at national, state, district and school levels. Alhamdulillah, the Ziarah Cakna Programme is also a visit by teachers to students' homes to meet parents and guardians, to discuss and exchange views on overcoming truancy, and this is one of the more proactive measures to deal with truancy and truant children. And it is here that success can be achieved, even though it may take time for teachers to go to their homes to meet them and so on; sometimes the strict PNP (teaching and learning) factors mean that this programme, though good, may need time to resolve matters. So, thank you.
Before I give the floor to Machap, I would like to remind the Honourable Members, under Standing Order 26(5), that a supplementary question must not introduce matters or materials not included in the original question. This means that any supplementary question must relate to the original question and not be a new question. Please proceed, Machap.
Thank you, Mr Speaker, and thank you to the Honourable EXCO for answering the question I raised. In relation to the causes of truancy from classes and truancy from school, as already explained by the Honourable EXCO just now, there are also students who play truant from school, particularly those related to family poverty problems. Sometimes parents are unable to provide daily expenses for their children, and sometimes they are also unable to provide bus fare or transport for their children. So, what can the Johor State Government do to help in this matter? Thank you.
Jemput EXCO.
Thank you to Machap for the supplementary question. In relation to poor families being a factor in the problem of truancy, in fact, in terms of the position of poor or troubled families, firstly, if we look, there is the PIBG, the Parent-Teacher Association (Persatuan Ibu Bapa dan Guru), and also, most recently, as we are well aware, there is the Parent Support Group (Kumpulan Sokongan Ibu Bapa), and there is yet another group called the Community Parent Mobilisation Group (Kumpulan Penggerak Ibu Bapa Komuniti). These are all groups established in schools to help, firstly, indirectly with administration, particularly on matters of student discipline, and also with assistance related to development to a small extent. So, in this regard, in fact, if we look, there are several schools that are ahead in helping poor students who have truancy problems; as we are well aware, some associations or the teachers' room themselves have made contributions or monthly collections to ensure these students receive schooling assistance. This is the experience of several schools that have implemented this programme, and Alhamdulillah, it has succeeded. Among the proposals submitted, what are the proposals or views of the Johor State Government? God willing, we will take note and we will manage such programmes with assistance to the PIBG that has been planned. We will provide contributions from the State Government to the PIBG to monitor the target student group specifically for truant students from poor families whose truancy is caused by poverty, so we will help. These are among the proposals and plans that we will implement. Thank you.
Bukit Pasir, please proceed.
Honourable Mr Speaker,
Bukit Pasir first.
Soalan tambahankan?
Yes, Bukit Pasir first.
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker, a supplementary question from the Bukit Pasir State Constituency (DUN Bukit Pasir). What actions or encouragement are being taken, because there is also a number of students who are not attending school, children born out of wedlock. In the Bukit Pasir State Constituency area, there are children born out of wedlock who have no identification documents and are neglected. What actions will the state government take so that these children are not neglected from schooling? A question from Bukit Pasir.
Please proceed, the Honourable EXCO.
Can I answer? Because that question is not a truancy question. The question concerns children born out of wedlock who have no identity. But for the information of everyone in this House, Bukit Pasir raised the matter of children not attending school because they have no documents. So in this matter, at the ministry level and also at the department level, there is indeed an important management process for verifying where the child was born, and also the hospital and so on. At the very least, the child has information on the mother or the father, one of them. From there, the identity of the student or these children can be obtained. That identity gives them the opportunity to attend school. What matters is knowing where the child was born and who the mother is, because if the child continues to have no relevant documents, it is very difficult. That means the child is not a citizen. This happens in parts of Sabah and Sarawak, but perhaps in Johor not many have this issue. It may be because they are children of migrants or people who really have no identity. So, in any case, they will have to refer to the Registration Office where the child was born, for how the management proceeds after that. That is all, thank you.
The next question. The Honourable Member for Pulai Sebatang, please.
Honourable Speaker, my question is number 4.
What is the total number of RMBJ that has been offered to the public after PRU14, and how many RMBJ are expected to be completed before 2023, based on the approvals given up to today?
The Honourable Member for Pekan Nanas, please.
Mr Speaker, my question is number 5.
What is the total number of applications for low-cost houses and Rumah Mampu Biaya in the state of Johor, and the total number of Low-Cost Houses and Rumah Mampu Biaya planned and able to be built in the state of Johor?
The Honourable Member for Layang-Layang, please.
Honourable Speaker, question number 6.
What is the status of the construction of 100,000 affordable housing units under the Projek Perumahan Rakyat (RMMJ) for the state of Johor and the DUN Layang-Layang?
The Honourable Member for Penawar, please.
Honourable Speaker, my question is number 7.
Please state the total number of Rumah Mampu Biaya that have been fully completed throughout the state of Johor, and how many have had their keys handed over to applicants?
So, there are one, two, three, four questions. The YB EXCO has to answer. Please proceed.
Bismillahirrahmaanirrahim. Assalamualaikum warahmatullahi wabarakatuh. Honourable Mr Speaker, Honourable Dato' Menteri Besar and all other Honourable Members. Honourable Mr Speaker, I request to answer questions A162, A165, A50 and A92 together. For the information of this respected House, the state government constantly monitors the development of the Rumah Mampu Biaya Johor through the Johor State Housing Task Force Committee. According to the Housing Task Force report, the total number of Rumah Mampu Biaya Johor, or RMBJ in short, that were fully completed, meaning 100% of construction work was completed throughout 2018, is 2,035 units. This total involves 17 housing estates or areas. A total of 1,632 units were issued a Sijil Layak Membeli Rumah, or SLMR in short, a Housing Purchase Eligibility Certificate. Of the total issued, 659 units successfully obtained housing loans and the house keys were handed over to the buyers.
Among the reasons why not all 2,032 completed housing units were offered an SLMR is that there are 4 housing estates that have not yet registered their Rumah Mampu Biaya with the SUKJ Housing Division. One estate is in the process of registering with the SUKJ Housing Division, and also Rumah Mampu Biaya that have received less response, especially one type of Rumah Mampu Biaya Johor, Type C, which is a city house or, with the permission of Honourable Speaker, a Town House.
Honourable Mr Speaker, beginning 1 August 2018, the government decided on a new method of managing housing allocation in a more transparent manner, where this allocation method is carried out by open balloting, with permission, open balloting. This open balloting system is conducted by drawing one lot for one successful person, who will then be issued a Sijil Layak Memiliki Rumah. At the same time, 3 more draws are made for a list of reserves, with permission, waiting list, in case the individual who obtained the first SLMR fails to obtain a housing loan within the 2 months set from the date the SLMR was issued. This method, the method of drawing lots for 3 waiting lists, will reduce room for discretion, which ultimately exposes the process to unhealthy elements such as corruption and abuse of power.
From 1 August 2018 until May 2019, which is a period of 10 months, a total of 18 housing estates involving 3,599 units of Rumah Mampu Biaya Johor were approved by the Johor State Housing, Communications and Multimedia Committee to be offered to the public. Of the 18 projects, 5 projects have held open balloting events, while the remaining 13 projects are still in the process of being advertised on the e-rumah Johor website and in the mainstream media for public announcement, and are also waiting for their turn for the open balloting process to be carried out.
Honourable Mr Speaker, based on statistics from the Johor State Housing Task Force Committee, there are a total of 21,374 units of Rumah Mampu Biaya Johor expected to be completed by 2023, as stated in the Pakatan Harapan Manifesto. The status of these 21,374 units of Rumah Mampu Biaya is at various stages of approval, such as Planning Approval, or KM in short, or Amendment to Planning Approval at the Local Authority level, Re-conversion Approval at the PTG level or the Natural Resources Committee, and also at the stage of applications for advertising licences and housing developer licences, with permission, APDL, from the National Housing Department. In other words, the total of 21,374 units of Rumah Mampu Biaya Johor have not yet been registered with the SUKJ Housing for offering for sale to the public.
Honourable Mr Speaker, in conclusion, after PRU-14, that is, starting from June 2018 until May 2019, taking into account only 50% of the Rumah Mampu Biaya Johor statistics completed throughout 2018, because the general election was held in May, we take the 50% statistic, including 3,599 units of Rumah Mampu Biaya that have been offered to the public since 1 August until last May, and another 21,374 units of Rumah Mampu Biaya expected to be completed by 2023, which are at the various stages of approval I mentioned earlier. The total number that has been completed and offered and is expected to be completed by 2023 is 25,000 units. Based on these statistics, God willing, our efforts to achieve the target of building 100,000 units of Rumah Mampu Biaya by 2023 are on the right track, and God willing, it is not impossible to achieve.
Honourable Mr Speaker, referring to the Johor housing system, the total number of applications for Rumah Mampu Biaya Johor to date is 42,981 applications. The breakdown of applications by district is as follows: Johor Bahru, 29,883 applications; Kulai 2,415 applications; Pontian, 618 applications; Kluang, 1,906; Batu Pahat 3,143 applications; Muar, 1,885 applications; Tangkak, 908 applications; Segamat, 975 applications; Mersing, 255 applications; and finally, the district of Kota Tinggi, with 993 applications.
Honourable Mr Speaker, in addition, to answer the question from the Honourable ADUN for Layang-Layang regarding the development of Rumah Mampu Biaya Johor in DUN Layang-Layang, the following is a list of developments involving the Rumah Mampu Biaya Johor component located in DUN Layang-Layang. First, developer KEJORA, the total number of Rumah Mampu Biaya is 47; Developer Dyna Tenaga, 87 units; third, SKF Properties, 28 units; fourth, Developer VC Link Sdn Bhd, 9 units; and fifth, Ringland Development Sdn Bhd, 17 units, making the overall total 1,888. That is all, Honourable Mr Speaker.
Pulai Sebatang.
Thank you, Mr Speaker. In the answer just now by the Honourable Member, it was mentioned that 21,374 units of Rumah Mampu Biaya Johor are expected to be completed by 2023. My question here is, what steps have been taken and will be taken by the government to ensure that these 21,374 units will really be built and completed by the developers? Thank you.
Please, YB EXCO.
Honourable Mr Speaker, and thank you to YB Pulai Sebatang. The figure of 21,374 units of Rumah Mampu Biaya that I mentioned and in the answer just now refers to the number of Rumah Mampu Biaya expected to complete construction by 2023, which are at various stages of approval.
Previously, according to the Johor State Housing Task Force Report, there were 115,461 units of Rumah Mampu Biaya Johor that should have been built by housing developers but have not been built until now. Among the reasons are various, among them are weaknesses contained in the Johor People's Housing Policy (DPRJ), which was implemented from 2012 for areas within Iskandar Puteri and 2014 for areas outside Iskandar Puteri. That is why, from September 2018 until April 2019, our Housing Division held a Task Force with a series of workshops involving various agencies, including government agencies, industry players including REHDA and housing developers, and also professional bodies such as Town Planners, Architects, the Royal Institute of Surveyors Malaysia and so on, to review and study the Johor Rumah Mampu Biaya Housing Policy, so that it can be strengthened and ensure that planning and development proposals submitted to housing developers can be implemented in the future.
Therefore, starting from 1 April 2019, the new Housing Policy has been enforced. Among the improvements in this new policy relating to the question from Honourable Pulai Sebatang are, first, what we do is introduce control applied as early as the KM application at the PBT, where development other than Rumah Mampu Biaya Johor must be carried out simultaneously and proportionately with the development of Rumah Mampu Biaya Johor. In other words, development other than Rumah Mampu Biaya Johor and the development of Rumah Mampu Biaya Johor must be carried out concurrently, with permission, concurrently, and in a ratio that is proportionate, with permission, proportionately, in phases. In other words, every development phase must have a Rumah Mampu Biaya Johor component, and there will be no more construction of Rumah Mampu Biaya Johor by developers at the final phase.
Second, during the KM application at the PBT, no approval will be given if the applicant developer fails to meet the requirement of providing the minimum component of Rumah Mampu Biaya Johor, which is 40% of the total units built for development areas exceeding 5 acres, unless due to natural factors or the land is involved with the Land Acquisition Act 1960.
Third, for developments involving amendments to Planning Permission at the PBT level, the state government has taken action by raising the replacement charge from RM40,000.00 per unit for each unlimited Rumah Mampu Biaya unit that is not built to RM40,000.00 for payment in one lump sum, or with permission, lump sum, or RM60,000.00 per unit for instalment payments of 4 times over a period of 2 years.
Fourth, the land title condition on the title document for the Rumah Mampu Biaya Johor component will state that the state authority, through Section 122 of the National Land Code, sets a period of 2 years from the date of registration of the building's title for it to be completed. That is all, Honourable Speaker.
The Honourable Member for Pekan Nanas, please.
Honourable Mr Speaker, what action is the government taking against developers who fail to provide Rumah Mampu Milik, will they be subject to fines, and what is the estimated amount of fines that have been collected by the government? Thank you.
Please, YB EXCO.
Honourable Speaker, and thank you to YB Pekan Nanas. For the attention of this respected House, as I mentioned earlier, if housing developers fail to provide the number of Rumah Mampu Biaya as determined at the KM level or at the SBKS level, at the PTG level or Natural Resources level, then, first, as I mentioned earlier, they are subject to the replacement charge of RM40,000.00 for lump sum payment, or RM60,000.00 per unit for instalment payment of 4 times within a period of 2 years.
Second, we also give leeway to developers so that if the development site has a major image, we allow them to submit another site for the development of Rumah Mampu Biaya Johor, but subject to strict conditions, including that it is located within the same PBT area and also subject to the fine as I mentioned earlier. That is all, Honourable Speaker.
Penawar, please proceed.
Thank you, Mr Speaker. My supplementary question is, what problems has the PH Government faced after governing for 416 days, and still has not handed over even one house that has been completed, especially in the Penawar area? I also want to know whether the target of building these Rumah Mampu Biaya has succeeded in being sold to all levels of society, considering that now the people can only look on. Thank you.
Please, YB EXCO.
Honourable Speaker, and also thank you to YB Penawar for the question raised. I feel this question refers to a housing estate by KEJORA in Desaru, namely Taman Impian, eh, Impian, if I am not mistaken, which involves development completed under KEJORA. Actually, this development has already been approved by us at the Johor State Housing, Communications and Multimedia Committee level, and we have approved it to be offered to the public. However, there is a slight technical issue, namely that the developer, KEJORA, obtained a loan, if I am not mistaken, Honourable Speaker, of nearly RM200 million from the Ministry of Rural Development, and this loan was given on the condition that part of the development is allocated to KEJORA staff. Whereas, with reference to our Affordable Housing Policy, we have abolished the quota, not only the Government Vertical Quota, where the distribution of Rumah Mampu Biaya was through the Barisan Nasional Component Parties, but also the quota for housing developers. This matter is still under discussion, and recently there have been discussions for KEJORA to obtain a written statement from the Ministry of Rural Development that the RM200 million loan was given on the condition that a large majority of the units built are reserved for KEJORA staff. God willing, if this is obtained, we will bring a special paper to the State Executive Council (MMK) for a further decision. That is all, Honourable Speaker.
The next question. Please, the Honourable Member for Skudai.
Honourable Mr Speaker, my question, question number 8.
The finances of the Johor State Government depend heavily on land tax and mining tax revenue. Therefore, what is the State Government's plan to expand the types of revenue in order to strengthen the finances of the State of Johor?
Please, YB EXCO, please, the Most Honourable Member.
Mr Speaker, allow me to answer the question from the Honourable Skudai regarding the state government's efforts to expand the types of revenue to strengthen the financial position of the State of Johor, as this matter is very important in ensuring the smooth running of development and administration of the State of Johor. I would like to state here that the financial performance of the Johor State Government is in a very good position. Based on the Johor State Financial Report ending 31 December 2018, which is currently being audited by the National Audit Department, the estimated total Consolidated Revenue Account is RM154 billion, while total expenditure is RM1.53 billion. This shows a surplus of RM5.26 million. Meanwhile, the total reserves of the Johor Government amount to RM2.46 billion.
The Johor State Administration, under the administration of the Pakatan Harapan Government, is always committed and seeks new ideas to further strengthen the state's financial position in order to provide the best services to the people of Johor.
Fiscal stability is also significant and must be the main goal. Among the new efforts of the Government to increase the revenue of the Johor State Government are through:
1. Review of land tax rates 2. Review of entertainment licence rates 3. Re-evaluation of taxable holdings of Local Authorities
Honourable Speaker, the last amendment to Johor land tax was made in 2004. After 15 years have passed, the State Government is of the view that it needs to be refined and improved in order to provide the best public services and facilities for the people.
Therefore, the State Government is now at the final stage of finalising the implementation of the review of land tax rates as contained in Section 101 of the National Land Code. This review and amendment of land tax is aimed at stimulating the development and economic growth of the State of Johor, as well as increasing the revenue of the Johor State Government. And certainly, the increase in land revenue that will be generated through this review of land tax will be utilised through the addition of programmes and projects towards the welfare of the people. What is certain is that the State Government will ensure that this review and amendment of land tax will not burden the people, especially the B40 group.
The Johor Land Administration, together with the Universiti Teknologi Malaysia, is also drafting the implementation of a specific study for the Land Administration Strategic Plan towards maximising more sustainable income, or as they say "sustainable income". The State Government will base its approach on issues and challenges from the aspects of strengthening laws, improving procedures and technicalities, generating new revenue (non-tax) and human capital development. This effort is not only believed to be able to increase state revenue receipts, but is also a medium- and long-term strategy to transform the Johor Land Administration.
For the implementation of the Amendment to the Entertainment and Places of Entertainment Enactment 1998, the state government is at the final stage of reviewing the proposed new rates for entertainment licence fees. In addition, the state government is also taking the initiative to strengthen the finances of the Local Authorities. Although the revenue of the Local Authorities is not included in the State Government's Consolidated Fund, this effort is seen as able to help increase PBT revenue and at the same time reduce the PBT's dependence on the equalisation grant from the State Government.
For 2019, the state government has allocated a total of RM13.7 million to the Local Authorities (PBT) for the purpose of equalisation grants. Therefore, the State Government also plans to carry out a re-evaluation of the taxable holdings of the Local Authorities.
In accordance with the requirements of Section 137(3) of the Local Government Act 1976, the Johor Local Authorities have been using the existing valuation list and tax rates for 5 years, and it is appropriate to carry out a re-evaluation. Apart from the requirements of the Act, the need for revaluation is based on the following justifications:
1. PBTs involved in the redelimitation of areas apply 2 or 3 tax rates and need to be harmonised to avoid confusion among taxpayers.
2. Avoiding significant differences in valuation increases and total property tax if revaluation is not carried out for a long period.
3. Updating data and information for properties in the PBT areas with current market value. The re-evaluation work period is in 2019 and 2020.
4. It is expected that the new valuation list and tax rates will be enforced in 2021.
Thank you.
Skudai, please go ahead with your supplementary question.
Thank you, Mr Speaker, and also thank you to the Right Honourable Member for the answer given just now. From the answer of the Right Honourable Member just now, we notice that the dependence of the State Government's revenue or income still largely depends on land tax.
In fact, we need to study where taxes other than land tax are suitable to be imposed, as is increasingly common now, namely carbon tax, or carbon tax, or pollution charges, which in fact fall under the concurrent list in the ninth schedule. Where the state government actually has power, it has the authority to impose such taxes.
So my question is, is the State Government ready or does it have plans and a long-term plan to explore these new types of taxes in order to ensure the financial position of the State Government remains sustainable?
Please, the Right Honourable Member.
Thank you. The State Government has several strategies to ensure the financial position of the State of Johor becomes more sustainable:
1. The State Government will place greater emphasis on empowerment to optimise the collection of existing revenue.
2. The State Government will enforce new measures in reducing revenue arrears.
3. The State Government will focus on more effective strategies to minimise revenue leakage.
The State Government is also in the process of restructuring state revenue towards a structurally balanced budget. Accordingly, attention will be given to recurrent revenue, and it is expected that revenue diversification will further enhance the sustainability of the State's financial position. As an example, the State Government is in the final phase of restructuring Government revenue to increase recurrent revenue such as land tax revenue, raw water tax, road charges, interest from fixed deposits and entertainment tax. We also strive to reduce dependence on non-recurrent revenue such as land premiums, office processing fees for land offices, licences and returns from agencies. Insya-Allah, the new government that I lead will be ready to listen to views from any party to further improve the economy of the State of Johor. With more careful planning and what I have stated above, it is believed that we will be able to strengthen and improve state revenue. Let us together pray for the prosperity of the State of Johor.
Benut.
Thank you, Honourable Speaker. Congratulations to the Right Honourable Member on the explanation regarding the matter of increasing State Government revenue. We all know that the 2019 Budget has already been tabled by the Right Honourable Member's predecessor. So this is a continuation. I believe the Right Honourable Member will also continue with the 2019 Budget.
The matter the Right Honourable Member mentioned, namely to revise taxes, is it reflected in the 2019 Budget as additional revenue? And Right Honourable Member, I think this revenue review or re-evaluation of taxes, whether upwards or downwards, is not the right time, Right Honourable Member. The people outside are squeezed. I believe the Government is also aware of this, though I don't know whether the Right Honourable Member can give an example, because the Right Honourable Member did mention just now that the B40 group will be taken into account. The people will not be burdened by the re-evaluation of taxes, which means it is an increase in taxes. So, it is not right, Right Honourable Member. We feel it is inappropriate timing to review taxes. Is the Government prepared to postpone it? And secondly, what is the example the Right Honourable Member gave of saying that the B40 group's pressure or their situation will be taken into account? What is the example, Right Honourable Member? Thank you.
Please, the Right Honourable Member.
Thank you, Honourable Benut. In principle, the Government will always study the taxes that are imposed, okay. Likewise land taxes or door taxes. We will always study and we will conduct a detailed study to determine which taxes we need to increase. For example, the taxes for our industrial areas we will increase, but for agricultural areas we will study whether they need to be increased or not. That is all, thank you.
Next question, I invite the Honourable Rengit.
Mr Speaker, question number 9.
Requesting an explanation of the current status of health services in the State of Johor. Please state the total number of government and private hospitals, the number of beds, and the total number of doctors and nurses. Do these facilities meet international standards? If not, what steps are being and will be taken by the government?
Ok, I invite the EXCO Member.
Assalamualaikum warahmatullahi wabarakatuh. Mr Speaker.
For the information of all, the State of Johor has 12 government hospitals, of which 6 are specialist hospitals, 1 psychiatric institution and 5 non-specialist hospitals. The total number of beds in Johor State Government hospitals is 4,068 beds, excluding 1,132 beds in the psychiatric institution at Hospital Permai. In the State of Johor there are also 18 private hospitals operating with a total of 1,090 beds.
There are 2,659 doctors serving in government hospitals and clinics and 486 doctors in private hospitals, with a total of 3,145 doctors providing health services in the hospitals for the entire population of 3,770,300 in the State of Johor.
As for nurses, a total of 8,390 people serve in government facilities and 2,035 serve in private hospitals, with a total of 10,425 nurses providing health services.
Mr Speaker, based on the statistics of the Johor Department of Statistics for 2018, the ratio of doctors to population is 1:1,199. Meanwhile, the ratio of beds to population is 1.44:1,000 population.
Referring to the framework of the Strategic Plan for Specialties and Sub-specialties of the Ministry of Health Malaysia under the Eleventh Malaysia Plan (RMK-11) for 2016 to 2020, these ratios have not yet reached the Ministry's overall target set, namely the ratio of doctors to population with an indicator of 1:400. Meanwhile, the ratio of beds to population is 2.3:1,000 population.
Human resources are one of the constraints faced in efforts to achieve the set targets. Among the steps taken by the government to increase the number of doctors and nurses is by speeding up the waiting time for entry into government service and entry through contract posts without having to wait for vacancies. The government has approved the construction of Pasir Gudang Hospital under the first rolling plan of RMK-11 and is now in the process of preparing tender documents. Construction is expected to begin in 2020 and will provide 304 beds. That is all.
Next question. I invite the Honourable Perling.
Mr Speaker, my question is the tenth question.
What efforts have been made by the Johor State Unity Department to strengthen the unity agenda through the KRT?
Thank you, Honourable Speaker, thank you Honourable Perling. Rukun Tetangga (KRT) is an important mechanism under the National Unity and Integration Department to assist the government in fostering and strengthening the unity agenda at the community level. Therefore, the department, particularly Johor Unity, has drawn up various initiatives towards empowering the role of Rukun Tetangga as agents of unity and also as the eyes and ears of the government in the community.
Starting from 2019, Johor Unity has prepared the Rukun Tetangga Empowerment Programme 2019 - 2020 under the department's strategic plan. This Rukun Tetangga Empowerment Programme aims to prepare Rukun Tetangga to face various challenges to ensure that social welfare and racial unity can be realised through its theme "Rukun Tetangga: Facing Challenges, Realising Hopes", thus 10 empowerment programmes have been drawn up as follows:
1. Leadership - Streamlining and strengthening the leadership of key leaders in the Rukun Tetangga Committee so that they can play a more effective role.
2. Management and Administration of Rukun Tetangga - Increasing the knowledge and understanding of the Rukun Tetangga Main Committee to improve the efficiency of Rukun Tetangga governance.
3. Preparation of a Neighbourhood Action Plan or "MyPTK2019" - To ensure that Rukun Tetangga carries out activities according to the issues, challenges and needs of the community and that the activities implemented have high impact.
4. Issue Management/Mediation/Community Peacemaking - Training and preparing the Rukun Tetangga Main Committee with knowledge and skills to manage their respective communities effectively. Rukun Tetangga leaders also act as intermediaries to settle any disputes that arise in their respective communities.
5. Unity Education - Increasing the knowledge and understanding of the Rukun Tetangga leadership on aspects of unity in order to strengthen their role as unity agents at grassroots level and to be further disseminated to the community through the methods of "engage" and "educate" or "damping" and "didik".
6. Young Neighbours Development - Developing and strengthening the role of the younger generation in helping the government to improve social cohesion and community welfare.
7. Strengthening of Bureaus - Ensuring that each Rukun Tetangga establishes and strengthens the Bureaus under their respective Rukun Tetangga, namely the Women Neighbours Bureau (SeJIWA), Young Neighbours Bureau, Golden Age Neighbours Bureau and Neighbourhood Seedlings Bureau.
8. Community Economic Development - Encouraging Rukun Tetangga to carry out economic projects to generate income and help reduce the cost of living.
9. Star Rating - Giving star ratings to Rukun Tetangga that have shown excellent performance and as a benchmark of the level achieved by Rukun Tetangga.
10. Rukun Tetangga Excellence Award - Giving appreciation and recognition to outstanding Rukun Tetangga. This recognition aims to motivate Rukun Tetangga to continue strengthening their role in the community until they gain recognition at state level and subsequently at national level.
Therefore, all parties are advised to always provide support, commitment and close cooperation with Rukun Tetangga to ensure that Rukun Tetangga can play a more effective role and have a high impact on the aspects of unity and social welfare of the community. Thank you.
Jemput Perling.
Yes, thank you for the answer from the Honourable EXCO Member. So, we also understand because, for example, not all KRTs in our area are active. So, is there a special action to activate or stimulate KRTs like these so that they become more active?
Please, the Honourable EXCO Member.
Thank you, Honourable Perling. For the information of the august House, in the State of Johor, as of January 2019 there are 801 KRT units and 620 Volunteer Patrol Scheme units. And recently the Prime Minister made a public announcement that up to 30% of KRT units are inactive, but in Johor that figure is lower. About 15% to activate these inactive units is difficult. We thought that we would set up new KRTs. So, I would also like to inform any ADUN who wishes to establish a new Rukun Tetangga to please submit it to me.
So what happens to the old KRTs, Honourable?
The inactive ones. KRT started in 1975, a long period of 44 years, and there have also been changes of government. So, we did not expect that those that are inactive would become active. So we take this opportunity to establish new KRTs. So, this is an opportunity to establish new KRTs. Thank you.
Next question, the Honourable Stulang.
Mr Speaker, my questions are 11 and 12.
Please state how many tourist destinations and celebration events have been determined to be promoted in the Visit Johor Year 2020 campaign?
What is the target number of tourist arrivals set by the Johor Government for Visit Johor Year 2020?
Honourable Tangkak, please.
Mr Speaker, my question is number 13.
What are the plans and Government Action Plan to produce and promote attractive tourism products in Johor in conjunction with Visit Johor Year 2020?
Honourable Pemanis, please.
Mr Speaker, my question is number 14.
What are the government's preparations to face Visit Malaysia Year 2020?
Honourable Perling, please.
Mr Speaker, my question is number 15.
What advertising plans and methods will be adopted by the government in promoting Visit Johor Year 2020? In addition, please also state the state government's efforts in making the Visit Johor Year 2020 campaign a success.
We have 15 questions for the Honourable EXCO Member, 5 sorry, from 11 to 15.
Thank you. Mr Speaker, allow me to answer the questions from Stulang, Tangkak, Pemanis and Perling together, as they touch on the same matter. Thank you to the Honourable Members who submitted questions regarding the Visit Johor Year 2020.
The state government greatly welcomes the concern of the Honourable Members on this matter. In intensifying the Visit Johor 2020 campaign, the Johor state government, through Tourism Johor, Tourism Malaysia and MOTAC, is now stepping up efforts to improve the physical and framework preparations.
For information, Tourism Johor has planned to introduce 20 festivals or 20 destinations of domestic and international standing, as well as 20 selected destinations with unique and potential tourism products throughout the state of Johor. This is as a symbolic celebration of Visit Johor Year 2020. The 20 selected events will be listed in the Johor tourism calendar, including sports events, food festivals, celebrations, culture and education, and will include existing events and new events.
Tourism Johor is strongly committed to promoting the proposed listing of the 20 selected events that have potential to be showcased and have prospects that meet international market demand, among them the Pasir Gudang World Kite Festival, Kembara Mahkota Johor, Chingay Festival, Johor International Rally, Sultan Ismail Bridge Carnival, Johor Food Festival, Johor Arts Festival and others. With the involvement of Yayasan Warisan Johor, welcoming events for tourist arrivals will be held at selected entry points, namely Senai Airport, the Ferry Terminal and the CIQ Johor Bahru. In addition, next year, 2020, the state of Johor will also be the focus as the host of SUKMA XX Johor 2020.
To support the success of Visit Johor Year 2020, the continued close cooperation from various parties such as government agencies, private agencies and the operators of the state's tourism agencies, by instilling the values of tourism, will make the state of Johor the most outstanding tourism destination on the international stage.
Mr Speaker, apart from that, the statistics of tourist arrivals to the state of Johor also play an important role, as the statistics will determine whether the mission of Visit Johor Year 2020 succeeds or not. Therefore, the Johor state government, through Tourism Johor, has set statistical estimates for 2019 and 2020. For information, the number of overnight tourists in 2017 was 7.4 million. Tourism Johor set a target for 2018 of 7.7 million. For 2019, 8 million, and for 2020, 8.4 million. All these targets are based on an increase of 5% in overnight tourists each year. Apart from overnight tourists, Tourism Johor also focuses on visitors who come to the state of Johor. We are striving to increase the number of visitors to the state of Johor by 5%. For information, in 2018 the state of Johor received 15.8 million visitors. We set a visitor target for 2019 of 16.6 million, and for the coming year 2020, 17.4 million. The initiatives and action plans that have been drawn up to promote Visit Johor Year 2020 and promote Johor as a preferred tourism location are as follows:
1. The "Road Show" (with permission) programme to be implemented in every District of the State of Johor, "Road Show" (with permission) in the states of Pahang, Sabah, Sarawak, Melaka and around the Klang Valley, as well as selected ASEAN countries.
2. Strengthening the "Software" (with permission) aspect, which includes promotional and publicity announcements through the media, especially social media, to create "Awareness" (with permission) of Visit Johor Year 2020.
3. The Visit Johor Year 2020 campaign includes the "Hardware" (with permission) aspect, namely improving and strengthening aspects related to product development, infrastructure, tourism support facilities and destination management.
4. Organising Festivals, Events and Expos of national and international standing, such as SUKMA 2020, the E-Sports Championship, the 25th World Kite Festival, the Chingay Parade Festival and so on.
5. Organising a series of Fam-trip visits involving international and national media, bloggers and tourism agencies.
6. Intensifying advertising through electronic and mass media at strategic locations such as billboards, LED screens, television, radio and so on.
In addition, the provision of a smartphone application, namely "Destinasi Johor", to boost the publicity campaign in conjunction with Visit Johor Year 2020. New target countries are planned based on the Johor State Tourism Marketing Strategic Plan 2016 to 2020, which focuses on primary and secondary target countries. The primary tourism target countries are the ASEAN countries, China and India. Meanwhile, the secondary tourism target countries are European countries and others. That concludes my reply, thank you.
Jemput, Perling.
Earlier I heard the answer from the Honourable EXCO, thank you. However, what I heard just now was actually in terms of promotion and infrastructure development. But, I am of the view that human capital is also one of the important things in this matter. Because they are the front liners, (with permission), who deal directly with tourists. So, my question is, what are the state government's plans, in terms of training or action on human capital skills in this regard?
Please, YB EXCO.
Mr Speaker, thank you for the supplementary question from YB Perling. Tourism front liners, (with permission), are the drivers of the tourism industry who stand at the forefront to welcome and provide information to tourists. This is very important to ensure that tourists who come to the state of Johor receive a good welcome and can reflect the local community's cultural values to foreign tourists. In ensuring that all front liners in the state of Johor are always ready to welcome arriving tourists, the state government regularly holds courses, campaigns and workshops to provide information and training to front liners.
Several courses have already been conducted since last year and this year, including the Focus Group Discussion Workshop on the Direction of Tourism Johor, the Customer Service Course for front liners of hotels in the state of Johor, the Course on Improving the Service Delivery of front liners and Tour Guides, and we have also held the Tour Guide Course together with the Tourist Guides Association, and we have also held the Visit Johor Year 2020 Workshop and so on, including the Hospitality Course together with front liners of the tourism industry.
Mr Speaker, in my view, for welcoming tourists from abroad or overseas, my opinion or view is that every State Representative of Johor is a Spokesperson for the State of Johor, who is also a front liner for the State of Johor, and I would like to take this opportunity to call on everyone, whether government officers or Representatives here, that we also welcome tourists well with a friendly attitude so as to protect the image and good name of the State of Johor. That concludes my reply, thank you.
Stulang.
Thank you for the answer given and for the very many promotions and efforts. I would like to know the amount of allocation set aside for all the programmes and promotions. Thank you.
Please, YB EXCO.
Mr Speaker, thank you to the ADUN for Stulang. The Johor Government is indeed committed and serious about promoting Johor as a preferred domestic and international destination, and this is in line with the mission of Tourism Johor, which is to make Johor a Must Visit Destination and to place Johor on the world tourism map.
Visit Johor Year 2020 is the initial step to achieve this aspiration. Of course, promotion plays an important role apart from the infrastructure and tourism products available in this state. The state government has allocated a sum of RM3.679 million for the 2019 Budget, and this budget includes the allocation for promotion and the development of products and events, among others. Among the promotional highlights that have been and will be carried out by the state government through Tourism Johor are as I have presented in my earlier answer. These promotions are carried out continuously, and Tourism Johor has also participated in various promotional and marketing events at home and abroad, such as the ASEAN Tourism Forum in Vietnam, ITB Berlin, MATTA Fair, MITN Travel Fair, Fan Street and so on. At the same time, the state government has also received a 50% distribution of tourism tax revenue from the Ministry of Finance, amounting to RM7.99 million.
For the information of Members of the House, this distribution is additional revenue to the state government in line with the federal government's wish to help state governments increase their income, especially in the field of tourism. This distribution of tourism tax revenue will be allocated for the maintenance and provision of tourism facilities, promotion and marketing of tourist destinations, and also improvements to the reporting of tourism statistics to MOTAC. So, with this tourism allocation, the state of Johor can develop the tourism and cultural sector comprehensively, sustainably and inclusively, in driving the tourism and cultural industry of the state of Johor to an outstanding level and further promote the state of Johor. That concludes my reply, thank you.
Panti, Honourable Member.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Thank you, Honourable Speaker. My supplementary question relates to Visit Johor Year 2020: what is the level of preparedness of the hospitality and service industry in particular, and how does the government measure the effectiveness of the efforts carried out to ensure that Visit Johor Year is successful, and finally, how can these efforts carried out by the state government balance the participation of bumiputera in the opportunities that exist during Visit Johor Year 2020 to come. Thank you.
Please, YB EXCO.
Thank you, Honourable Speaker. For Panti's question regarding how we can ensure that the tourism efforts in the state of Johor can achieve. So, as I mentioned earlier, Tourism Johor has identified 20 destinations and also 20 festivals or events that we will fully push to promote for Visit Johor Year 2020. So, for the coming year 2020, all 20 destinations and 20 events are not only determined by Tourism Johor, but this is also an effort and discussion with all the parties involved, including the PBT, district offices and all government sector agencies and also the private sector. So, with this, we need to ensure that these 20 festivals and 20 destinations are in a good state of infrastructure so that we can welcome tourists to these 20 places that we will promote. That concludes my reply, thank you.
The time is nearly 11 o'clock, nearly 11, 2 minutes more. I think we will conclude for now with the questions from the Honourable Members. Any questions on the list that have not been answered orally will be answered in writing during the same sitting.
Honourable Members, the debate on the Motion of…
Excuse me, YB Speaker. Assalamualaikum, Mr Speaker. Mr Speaker, Permas applies to move a Motion to suspend the sitting of the State Assembly under Standing Order 29, the Standing Rules and Orders of the Johor State Assembly, to bring forward a certain matter of urgent public importance that needs to be expedited, namely a review of the level of safety of the people of Pasir Gudang. Two high-profile incidents have occurred in Pasir Gudang within the last 3 months.
First, the first incident was the pollution of the Sungai Kim Kim, and the second incident was the pollution of hazardous gas. Permas is very confident that this matter will continue to recur if no review and action is taken by the government. Therefore, Permas moves a Motion to suspend the Assembly to hear that motion. Permas requests the government's stand on this issue. That concludes my reply, thank you.
Please take note.
Honourable Speaker…
Tiram, wait, Tiram, I will take first, I will take Permas's document first. Please allow time to read briefly.
Honourable Members, for this matter to be considered by the State Assembly, I as Speaker must be satisfied that the matter raised meets the conditions under Standing Order No. 29. The first condition is that the matter is specific, second, that it is of urgent public importance, and third, that it needs to be expedited.
Namely a review of the level of safety of the people of Pasir Gudang. Two high-profile incidents have occurred in Pasir Gudang within the last 3 months. Namely, first, the incident of pollution of the Sungai Kim Kim, and second, the incident of pollution of hazardous gas. Permas is very confident that this matter will continue to recur if no review and action is taken by the government. Therefore, Permas moves a motion to suspend the House to hear that motion.
Jadi, setelah...
Mr Speaker, a point of order. This is a Representative of the government, Mr Speaker. We want to make an urgent motion. The government has all the strength and all the ability to implement measures to overcome the problem of pollution. Why, this morning, would we waste time listening to a motion from the government itself, for the government to take action? This is correct, Honourable Member, this matter is important, a matter of public interest, but the third condition, Honourable Member, is that it must be expedited. Indeed it must be expedited. This matter has recurred twice. The government and the same government are facing the same problem. How can you, Mr Speaker, do a rolling?
Cadangan Benut...
Honourable Member, you are doing a rolling by saying that this matter needs to be expedited. Please expedite it, Honourable Member, leave it to the government to do what is proper. If we want to debate, if we want to discuss this matter, we are the government. If we were the ones bringing the motion, that would be a different story, Honourable Member. I believe if we bring it, perhaps you would reject it, because you say there is no need to expedite it as the government has already acted. It is even worse if the government itself brings it. Mr Speaker, we do not need to waste time, the government already has the strength, expertise and so on. Just implement it, Mr Speaker. Thank you.
I am of the view that this issue is very important and we indeed have room today to debate it more carefully, yes. So, this opportunity should not be simply wasted. Whether from the government or from the opposition, we are all sitting in one House, and if there are voices with this emphasis, I think that is even stronger for the government to take action, yes. Therefore, in view of this, I allow the motion to be debated. Is there anyone who supports this motion? Under this requirement it must be 10 persons, please. More than 10, yes. Thank you.
As more than 10 State Assembly Members have stood up, I allow this motion to be debated at 4.00 p.m. today. I allow two persons from the government side and two from the opposition to speak. Each will be given 10 minutes. So, as I mentioned earlier, this is the best platform for both sides to emphasise this issue and to give greater emphasis to this issue, so both sides, whether the government or the opposition, can play a role in giving emphasis to this major issue. So I think that is all for now, we will take a 15-minute break. From 11.05 a.m. to 11.20 a.m. We will take a short break.
The sitting was suspended at 11.05 a.m.
The sitting resumed at 11.35 a.m.
Honourable Members, the debate on the Motion of Thanks for the Royal Address of His Royal Highness the Sultan of Johor will be conducted over 4 days starting from today, 30 June 2019, until 3 July 2019. The government will wind up the debate on 4 July 2019 and 7 July 2019. I would like to remind all Honourable Members to observe etiquette and discipline while in and debating in this House, in line with the Standing Rules and Orders of the Johor State Assembly No. 45.
Debate on expressing gratitude for the Royal Address of His Majesty the Sultan of Johor.Address / budget
Honourable Members, I will call the constituency names of Honourable Members based on the rotation list I have obtained. For the proposer of the motion, the time given is 40 minutes to 1 hour. The seconder is given 30 minutes, the Leader of the Opposition is given 30 minutes. Meanwhile, other Members of the House will be given 15 minutes to 20 minutes. To enable all Honourable Members to speak, I seek everyone's cooperation to observe the time given. I invite the Honourable Member for Senggarang.
Assalamualaikum warahmatullahi wabarakatuh. Salam sejahtera. Honourable Member, Mr Speaker, Senggarang would like to move the motion that a speech of gratitude be presented to His Royal Highness the Sultan of Johor as follows: Your Majesty, we, the Speaker and Members of the State Legislative Assembly assembled here, humbly offer our most profound gratitude for the gracious consent of His Royal Highness the Sultan of Johor in coming to this honourable House and subsequently commanding the opening of the Second Session of the Fourteenth Johor State Legislative Assembly.
Honourable Member, Mr Speaker, issues that Senggarang raised in the previous sitting of the State Legislative Assembly have received responses from the government, and Senggarang, on behalf of the people of Johor, expresses many thanks. However, some of the problems that Senggarang raised have not been resolved thoroughly, and the way forward remains unclear. The most unfortunate matter is that there are issues Senggarang raised which received no response or action whatsoever from the government. This makes them seem like a passing breeze that vanishes without a trace.
Honourable Member, Mr Speaker, in this speech Senggarang will raise again the issues that were previously brought up, to which there was no response or reaction at all from the government.
Next, issues that have received the government's attention but whose way forward remains unclear. At the final stage of the speech, Senggarang will touch on new issues, some of which require commitment and calm to resolve.
Honourable Member, Mr Speaker, the issues that have passed without any action by the government are as follows.
First, the leakages that occur in logging activities. Senggarang has personally gone to the field and seen with his own eyes the destruction of forests carried out by loggers who were given licences. However, they have breached the conditions that were set, as stated in the speech in the previous State Legislative Assembly sitting. The loggers have committed offences openly and there has been no action. Senggarang has personally lodged a complaint with the Malaysian Anti-Corruption Commission (SPRM) and hopes that the body can conduct an investigation and bring those who are irresponsible before the courts.
Second, illegal sand mining activities. Senggarang has received information that illegal sand mining activities are still continuing, in the districts of Kota Tinggi, Mersing and possibly other districts. Senggarang once again urges the responsible departments such as the district land offices (PTD) and related agencies such as the Road Transport Department (JPJ) and the police to act appropriately in stopping these illegal activities. These activities can be eradicated by establishing an effective enforcement system. The government is also urged to take proactive action, such as facilitating the process of licence applications and transfer permits made by operators.
Third, groundwater resources. Since Senggarang raised the issue of groundwater resources, Senggarang has not heard of any policy made by the government in relation to this matter. It would also be good if the government appointed consultants of integrity, whether local or foreign companies, to conduct a study and provide clear advice to the government. We need to look for alternative water sources because surface water sources may suffer massive pollution to the point that the water can no longer be treated.
Fourth, agricultural and food policy. Agricultural and food policy is largely determined by the federal government. However, the state government can play a role in making its own policy for the welfare of the people of the state of Johor. For example, the Johor government has made a policy to make the state a supplier of major agricultural and livestock products to the whole country. We can direct the GLCs and the people to make agriculture and livestock their main activities. We can bring the latest agricultural and livestock technology from Indonesia, Thailand, the Netherlands, Mongolia and so on to boost these efforts. We can also obtain management models, farms and livestock operations suited to the conditions of our state. As in Indonesia, they have a policy and goal of being self-reliant in supplying their country's food sources. Within a certain period they aspire to become one of the world's food suppliers.
In addition, they have begun to consider producing healthier food sources with organic status, and through their organic food production methods and technology they have obtained technology for chickens that lay two eggs a day, morning and evening. The maturity period of broiler chickens can be shortened from 35 days to only 28 days, and various other agricultural and livestock technologies have been developed. Of all the authoritative sources, they are ready to transfer this technology to our country if we are ready to apply it. Why are so many paddy field areas in this state abandoned and left idle? That failure is because we do not want to move out of traditional management methods. We have not learned the lesson from a company that succeeded in managing a paddy field area in Kahang, Johor.
Fifth, the threat of pest animals. Monkeys and wild boars. The problem of monkeys and wild boars is one that has existed for a long time since the rule of the previous regime. The level of the problem has become more serious as the population of these animals, especially monkeys, has increased, while the protective action of the Department of Wildlife and National Parks (PERHILITAN) has become more aggressive. Thousands of Johor people, especially those living in villages, are unable to farm. Their fruits and crops have been destroyed by these animals, and likewise their chickens and livestock remain under constant threat. The government can protect these animals with strict laws and heavy penalties. At the same time, is the Department of Wildlife and National Parks willing to pay compensation for the destruction of the crops and livestock of these people? What is the justification for allowing the population of monkeys and wild boars to expand to the point of depriving the people of the ability to farm, when that is their source of additional income? The government must care about their fate. Conduct a detailed investigation in the field so that the government can make a proper consideration as to whether we should protect the welfare of the people or safeguard the interests of those monkeys and wild boars. Do not let such a simple matter require one or two decades to resolve.
Sixth, healthy lifestyle practices. The Johor state government should set an example in taking care of the health of its people. In the busyness of developing the state, the health condition of the people of Johor needs to be given attention. The problem of the people of Johor and Malaysia in general is obesity. Senggarang suggests that the Johor government run a massive campaign so that the people of Johor adopt healthy eating habits, do not consume excessive calories and are encouraged to exercise. Make the standard body weight of Johoreans less than 80 kg. It is expected that the government will be able to save hundreds of thousands of ringgit in medical costs and in the burden of national food supply. A professional study needs to be carried out to achieve this objective.
Honourable Member, Mr Speaker, Senggarang has found that some of the issues Senggarang raised have begun to be addressed, but the solution to these problems is less clear. These issues are as follows:
First, river pollution. We have not received any information on the pollution status of the major and important rivers in the state of Johor, such as the Sungai Johor, Sungai Sedili, Sungai Tebrau and Sungai Skudai. These rivers supply raw water to clean water treatment plants. Whether the quality of these rivers is improving or deteriorating is information that many Johoreans need to share.
Second, the Bukit Payong Waste Disposal Plant Project, Batu Pahat. The actual status of this project remains a question mark. Even after objections from the people, the project was halted, but there are signs of certain activities at the project site. Senggarang and residents who were involved in objecting to the construction of the project want to know the status of the Bukit Payong Waste Disposal Centre Project. Has it been cancelled, temporarily postponed, or deferred for a certain period?
The Honourable former Menteri Besar, Dato' Haji Osman Sapian, together with the Members of the State Executive Council, agreed to postpone the project, and this was accepted by the federal government on condition that a replacement site be found. It was postponed taking into account the following factors:
1. Its proximity to 18 villages and housing estates. 2. Its proximity to 9 government schools, the nearest being 1.3 kilometres away.
3. The doubtful EIA report, because the survey was only conducted on around 179 respondents, whereas there are 26,000 residents around Bukit Payong. 4. Bukit Payong is a heritage site with fossil beds millions of years old and the 500-year-old Batu Aceh.
Up to now, no replacement site has been identified. Senggarang proposes one replacement site in the area of the Lenggor Forest Reserve, which has been stripped bare, or the name of any forest reserve of equivalent status.
Honourable Member, Mr Speaker, fourth, the shortage of recreational, sporting and tourism places in the urban areas of the districts of Johor Bahru, Batu Pahat and other areas. There are many open spaces. Playing fields have been developed into commercial and residential areas, with the result that the residents of these towns have limited places for recreation and sport. This may also be one of the problems causing many urban residents to experience stress. Therefore, Senggarang proposes that the government increase the construction of recreational and sporting places on the vacant land that remains, in small amounts, such as along the river reserves and the main drains.
As Senggarang said in the previous State Legislative Assembly sitting, Senggarang once again calls on the government to upgrade existing recreational areas such as the Gunung Pulai waterfall, the beaches in Kota Tinggi, Pontian, Batu Pahat, Muar and others. Many facilities have been damaged and need to be repaired. The government also needs to encourage and assist associations and the private sector to develop places that can become centres of attraction for tourists, for example the Bugis Association, which once set up the Bugis Museum, and the batik-making place and herb garden in Muar. These operators should be assisted from time to time so that as they grow their businesses, these places will attract tourists to visit.
We have Legoland and shopping centres, but getting to these places requires expensive spending that ordinary people cannot often afford. There are not many special places that attract tourists to come to the state of Johor. We have been less successful in developing historical heritage sites such as Minyak Beku, located at the estuary of the Sungai Batu Pahat. This area is known as Rioformoso on maps and in Western historical records. Heritage sites such as the Bukit Segenting Lighthouse, the Minyak Beku Pasung House and the Tomb of Orang Kaya Daeng Ahmad have not been given attention and care by the government. Besides that, there has been no serious effort to beautify the Minyak Beku beach so that it becomes a recreational and sporting area that attracts tourists, both local residents and people from outside Batu Pahat. There may be many more historical traces which, if redeveloped and promoted, could become tourist attractions.
Fifth, the problem of unlicensed religious lecturers. Senggarang urges the Johor Islamic Religious Affairs Department to take action against lecturers who use lecture venues in surau and mosques for politics, hatred among Muslims, defaming leaders, spreading takfiri ideology and discrediting the government. These matters are reported to occur often in the state of Johor, as told by local people who have received support from officers of the Islamic Religious Affairs Department itself. Senggarang takes such misconduct seriously.
Sixth, the problem of allowances for mosque and surau officers, Quran teachers and Takmir. Simple and facilitating concepts should be applied in the method of paying allowances or salaries to mosque and surau officers, Quran teachers and Takmir. They should be paid an appropriate sum suited to current circumstances. We do not want these people to live below the poverty line. Senggarang has been told that some Takmir teachers are forced to share their allowances with certain parties, and if this is indeed happening, it is an example of leakage and a form of oppression that should not occur, especially in religious institutions. A study should be made to ensure that all these religious workers receive a reasonable amount of remuneration in line with the demands of costs and the current standard of living.
Honourable Member, Mr Speaker, Senggarang will continue the speech by highlighting new issues, some of which are critical and require attention and immediate action by the government.
First, misconduct in the management of logging and sand mining. Although this issue was touched on briefly at the beginning of Senggarang's speech, Senggarang wishes to repeat once more that there are efforts to divert the public's view, often confused by certain parties, that there is no evidence of outsiders entering the forest to fell trees and steal timber by taking it out without paying tax. What is happening is theft committed by loggers who were given licences by the Authorities. They fell timber in the zoned areas, fell timber that is not marked and that may not be felled, and do not record it in the timber register. They evade or do not pay tax, reduce the size of timber on tax forms to lower the tax rate, and even worse, remove timber without paying tax, namely "flying tax". They do not replant certain timber species in the quantities stated in the licence conditions. After they have cheated on the volume of timber extracted, they then apply for replacement areas, supposedly because the volume of timber has been reduced; the amount extracted is less than the amount recorded in their machines, whereas they have in fact extracted timber in multiple amounts until the forest becomes bare. They deliberately act negligently by understating the volume records of what they extract. They can do this because they are collectively protected by the authorities who manage forestry affairs.
The same goes for sand mining. Certain sand miners have carried out illegal mining activities openly for many years without any action, and have moved sand and rock in the middle of the night without any action by the authorities. In truth, they are carrying out illegal work by avoiding paying tax. They are also believed to be protected by administrators and authorities at various levels, which is also done collectively.
Honourable Member, Mr Speaker, Senggarang hopes that those who commit misconduct can be investigated and brought before the courts. In addition, we must realise that in today's highly sophisticated world there are methods that can measure the volume of sand and timber that has been extracted from an area. A comparison of the volume of output and the amount of tax paid will prove the amount of theft. Methods such as the use of Real Time Kinematic (RTK) and area mapping using drones with certain special software can estimate the amount of sand extracted from a mining area and also how much timber has been felled, based on information before and during the operation.
The government can appoint licensed expert consultants who have the capacity to provide such services with very convincing data. The government can make claims against the parties concerned who have failed to pay the taxes and fees that were due to the government. The government should not rely solely on reports from government departments because some of them are the cause of all these problems. A investigating body should be formed whose members consist of professionals such as licensed land surveyors, timber experts from the Malaysian Timber Industry Board, forestry experts from university higher learning centres, environmental experts and so on. For every logging and mining area that has been completed, the operator must appoint a licensed environmental consultant to prepare a report certifying that the operator has complied with all the conditions imposed. That consultant must be held responsible should complaints arise in the future.
Honourable Speaker, environmental problems that have not been resolved have instead worsened. We were shocked by the Sungai Kim Kim incident, followed by the cases of poisoning from inhaling polluted air that also occurred in Pasir Gudang. It is as if we could conclude that the residents around Pasir Gudang are in a threatened situation that requires firm and immediate action.
Honourable Member, Mr Speaker, most industries will produce toxic waste, and most of that waste is stored for some time before being disposed of. Some of the information on this toxic waste is held by the Department of Environment. Senggarang proposes that industries in the state of Johor submit a toxic waste report every month, stating the amount of toxic waste produced in that month and the amount of toxic waste in their storage.
The operators of these industries also need to state the method of disposal of the waste and the timing. Industry operators should also state the content of the toxic waste and the level of hazard of the substance. The government also needs to provide toxic waste disposal plants, and also encourage and assist the private sector to set up toxic waste disposal plants. With this effort, the cost of building plants can be reduced and the cost of disposing of the waste can be lowered so that it does not burden industry operators. What is happening now is that some industry operators seek opportunities at certain times to dispose of the waste illegally. They dump toxic waste into the Jurang area, bury it in the ground, and dump it in remote places, causing prolonged pollution. All the root causes of the problem are due to lax laws and the absence of an effective enforcement system. It cannot be denied that there is also an element of corruption that protects this problem. Senggarang proposes that the state of Johor establish an environmental corporation that acts as a body under Menteri Besar Incorporated to manage and regulate hazardous waste, industrial effluent discharge, the release of polluted gases into the air, and environmental impact assessment. Senggarang is confident that with the establishment of this environmental corporation, many environmental problems in this state can be resolved more effectively.
Third, river pollution. Technically, there is no difficulty in controlling a river from being polluted. The flow of a river comes from small channels, flowing into larger channels, or from drains around houses flowing into bigger drains and ditches, and then entering the river stream in that river basin. River pollution arises from raw effluent from factories that is not treated or is treated improperly, flowing into channels or ditches and directly into the river. Sand mining activities will also be a source of pollution if the washing water from the sand washing sluices is released into the river without first settling the mud suspended in that wastewater. Once the contents of all raw factory effluent have been identified and the mining areas have also been identified, then any pollution involving materials from certain industrial factories can assist enforcement authorities. Firm action must be taken, and the closure of factory operations must be carried out should they be proven to have released effluent without treating it. The ammonia pollution in the Sungai Skudai is very likely or almost certainly caused by the rubber factory located upstream of the river. If the government firmly directs the relocation of that factory, the problem of river pollution will certainly be reduced. Taking lessons from the frequent pollution incidents, Senggarang proposes the establishment of a trust fund for river and water resource restoration. The focus of this fund is as capital. A fund to assist in carrying out prevention and conservation operations, particularly for rivers and other sources of raw water. It has been reported to Senggarang that there is a revenue collection under the Johor Water Regulatory Body (BAKAJ) amounting to RM33 million a year from the Johor Water Company (SAJ), yet any maintenance of ditches and rivers is still moving very slowly. Senggarang proposes that this fund be placed under the state government, so that all development for the maintenance of ditches and rivers and other water sources can be successfully carried out. Once again, clear legislation, heavy penalties and effective enforcement will reduce the environmental problems that are increasingly worsening and threatening human life today.
Fourth, the relocation of hazardous industries to new sites. Senggarang, on 26 March 2019, which was after the Sungai Kim-Kim poisoning incident, proposed that industries and factories with hazardous status be relocated to industrial areas situated far from public settlements. That proposal was responded to by the former Menteri Besar, Yang Berbahagia Dato' Khaled Nordin, on 3 April 2019, in which he stated that it was not practical at all. However, Senggarang was greatly pleased when DYMM Tuanku Sultan, who commanded on 28 June 2019, gave the view that hazardous and high-risk factories should be relocated to more suitable areas. The poisoning cases that occurred were rooted in the previous government approving the construction of those factories without considering the safety and welfare of the surrounding residents, and this was made worse by the absence of effective enforcement action. In truth, the government of today is working to overcome all the problems inherited from the previous government.
Honourable Member, Mr Speaker, Senggarang continues to raise issues that are heated, with the sole intention of seeing the state of Johor continue to progress and excel.
First, the inflow of investment into the state of Johor. The progress of a state or national administration is measured, among other things, by how much foreign investment comes in or how many investors come to invest in that country or state. Accordingly, Senggarang would like to know, during the period in which the new government has governed the state of Johor, how many investors and how much investment have come into the state of Johor. Senggarang also wants to know to what extent the efforts made by the government in attracting investors and foreign investment to come to the state of Johor have gone? Does the government have plans to make new policies and investments that can attract and draw investors to this state? We have GLCs that are not few in number. To what extent have these GLCs played a role in attracting foreign investment? His Royal Highness the Sultan has stated the great importance of the government working hard to attract foreign investment to ensure that the state government's revenue generation continues to increase.
Second, the performance of the Johor state government's GLCs. It is now received news that many state GLC corporations and companies in Johor are not showing encouraging performance. Senggarang proposes that every GLC submit a report on the performance of their companies and that it be tabled in this honourable State Legislative Assembly. We have also been informed that the management of the Johor state GLCs have been paid salaries or remuneration of no small amount. A professional investigative body needs to be formed to identify the viability and potential of these GLCs. For GLCs that have suffered continuous losses, that have no potential and are not viable, they must be closed immediately to prevent the government from bearing greater losses. GLCs that are seen to have potential but have a weak management team must have that management team overhauled by forming a new management team. To facilitate the work of GLC heads, the GLC heads must assess their own ability; if the failure of their organisation is due to weakness or inefficiency of their management, then we offer these heads of management two choices: to resign voluntarily and honourably, or they will face investigation by an investigative and audit body that will be established. Action will be taken if there are cases of leakage and misappropriation. The government also needs to give recognition to the GLC management teams found to be outstanding and who have contributed greatly to the progress of this state.
Honourable Member, Madam Speaker.
Third, the achievements at the mid-term of the 2019 Budget. Senggarang sincerely hopes that at the end of this honourable State Legislative Assembly sitting, the government can inform the Honourable Members about the achievements at the mid-term of the 2019 Budget. That information will help the Honourable Members of the State Legislative Assembly to redouble their efforts in those areas where there are weaknesses.
Finally, Senggarang wishes to convey the complaints of construction contracting companies, engineering companies and engineering consultancy firms, architects, quantity surveyors, land surveyors and others, who complain that the space for them to earn a livelihood is shrinking as the government offers very few contract and new development works. In addition, they also complain that payment claims from the Treasury and the state government's Treasurer are received late. So they are now doing less work, and meanwhile the works they have completed are paid late by the government. Therefore, we ask that these complaints be investigated to avoid misunderstanding by certain parties towards the new Pakatan Harapan government.
Honourable Member, Madam Speaker, once again Senggarang calls on the government to give attention and response to the issues that Senggarang has raised. Any issue that is left unattended will certainly be raised again by Senggarang in the upcoming State Legislative Assembly sittings. Senggarang proposes that the motion expressing gratitude for the Royal Address of DYMM Sultan of Johor be accepted, and that this honourable House do so. Thank you, and may peace, the mercy and the blessings of God be upon you.
Thank you to Honourable Senggarang. I invite Honourable Pemanis.
Madam Speaker, Pemanis wishes to second the motion. First, Pemanis would like to record the highest appreciation and deepest gratitude for the consent of DYMM Tuanku Sultan Johor, who graciously came to this honourable House and consented to officiate the Second Session of the 14th Johor State Legislative Assembly. Salam Aidilfitri and greetings to the Members of this honourable House.
Madam Speaker, Pemanis also wishes to congratulate the Most Honourable Dato' Menteri Besar, who has been conferred the title Dato', and the newly appointed State Executive Council (EXCO). Pemanis is confident that the Executive Council under the leadership of the Most Honourable Dato' Menteri Besar can carry out its duties with well-defined objectives, definitive implementation without flip flop, and the people's trust entrusted to it can be fulfilled. Pemanis also wishes to record thanks for the contributions of the former Menteri Besar and former members of the State Executive Council who rendered much service to the previous government. Your contributions will always be remembered.
Madam Speaker, the cost of living is a stigma on the administration of the Pakatan Harapan government. We all accept the fact that the price of goods has not fallen with the abolition of GST, which has been replaced by SST. We must move on. Our new government is transparent; we are prepared to face all challenges. We move on. The methods that have been proposed to alleviate this situation include:
1. Raising workers' wages and, by doing so directly, increasing their purchasing power or their capacity to mitigate the prices of goods.
2. Strengthening the value of the Ringgit to lower the prices of imported goods.
3. More effective enforcement in efforts to control the prices of goods.
4. Adding competition in the market by balancing supply and demand, with permission, i.e. production and demand, especially for food items.
Madam Speaker, raising wages is not a good option because the prices of goods will fluctuate thereafter. That is, it will cause inflation. Strengthening the currency, meanwhile, will cause export-oriented manufacturing to lose competitiveness in the international market. Controlling the prices of goods, meanwhile, is not directly within the jurisdiction of the state government.
Madam Speaker, Pemanis is of the view that the state government plays a very important role, or pivotal role, with permission, in this matter. Although the state government has made many efforts to expand areas for planting, food and livestock, Madam Speaker, from feedback received there are still many who wish to venture into agriculture but have no land. Although Johor, especially North Johor, has very good conditions for developing agriculture, most of the land appears overgrown with bushes. The Department of Agriculture has tried to register vacant land for leasing, but the response, if judged by the online review, is very unsatisfactory.
Madam Speaker, allow Pemanis to propose to the state government that a mechanism be established to improve the use of Johor state land.
First step, all land suitable for cultivation but left idle should be subject to taxes that may be multiplied; that is just a suggestion. This includes land owned by government agencies. Land that is suitable and has been cultivated should be subject to the same land tax, and land that is suitable for planting and has been cultivated with crops recommended by the government, for example pineapple, should be subject to a lower tax. And Pemanis's proposal is that the leasing of land in this category be for short-term crops only.
Madam Speaker, this proposal is a proposal in principle and should be refined further with the implementation of this land-use policy. The state government will be able to collect more land tax. Landowners will add to their income from land rent, owners who do not cultivate their land, and individuals interested in agriculture but without land will be able to lease land under this scheme. Food production will increase and food prices will be controlled through a balance of demand vs supply, with permission, that is, demand and food production.
Madam Speaker, with the existing conditions, we have a visionary ruler, we have a dynamic government, and Honourable Members, an experienced and constructive opposition, I hope. The people of Johor are united, and the state of Johor has an ecosystem and sociopolitics that have great potential to become one of the most advanced states. The government is indeed functioning on the right footing. But Madam Speaker, to achieve the goal of becoming a more advanced state in a short time, we must change the gear of the government machinery from good to the best. The government needs to move out of its conservative comfort zone, comfort zone, with permission, and become more innovative and combative, that is, aggressive.
Madam Speaker, allow Pemanis to cite one example. In 2012 the British government planned to upgrade a bridge in front of the University of Cambridge, over Sungai Charles. In 2014 the upgrading works were still under study. In 2015 the people of Cambridge were informed that the upgrading works were scheduled to be completed in another year. And the bridge over Sungai Charles was eventually completed in 2018, taking 6 years at three times the estimated cost.
Madam Speaker, the same bridge, twice as long, in Beijing, the San Yuan bridge had to be upgraded because of the doubled traffic flow. Compared with the bridge in the UK, which took 6 years at three times the cost, the upgrading works on the San Yuan bridge were completed within 48 hours.
Madam Speaker, Pemanis is confident that the government aims not only to reach a medium level, or with permission, a moderate level, in this administrative term. Rather, it aims to reach the level of an excellent government. Pemanis once exchanged views with government officials from China recently, during a working visit together with the Honourable Minister in China. And Pemanis wanted to know the secret behind the rapid development in China that succeeded in driving the economy of its people to the point where it could have an impact on the whole world.
For the information of Madam Speaker and the Honourable Members, 40 years ago, 90% of China's 1 billion people received an income of less than USD2.00, yes. Today, 99% of China's people have passed the USD2.00 benchmark. According to Chinese officials, when there is a project that will bring benefit to the people and the government, they will proceed. If there is a mountain blocking the way, dig a tunnel, or level it, or move the mountain. If there is a river blocking the way, build a bridge. If there is a bridge that must be built but no river, dig a river. This is like the way of former Minister Sammy Vellu, yes. If there is an air problem, use advanced technology air filters. If there is a water problem, use advanced water treatment systems or high-tech closed systems. Use incinerators for toxic industrial waste. Whatever lies lengthwise or crosswise is broken; that is their way.
As a Wakil Rakyat (People's Representative) in this PH government that is barely one year old, Pemanis feels the government has been using a great deal of manpower and financial resources to maintain the continuity of the transfer of power. This is important in the context of ensuring the stability of the state government, the comfort of government staff, and that many old projects are continued. Business as usual, with permission. Pemanis feels that is good, but not the best. The current government indeed faces a funding constraint, so much so that the Most Honourable Menteri Besar has to travel frequently to Putrajaya to seek funds from the federal government, which in fact is also experiencing a funding constraint.
Madam Speaker, the government needs funds. Honourable Members need more allocations. This Hari Raya Aidilfitri there is no additional allocation, and some Honourable Members have had to cancel their Aidilfitri open houses, including Pemanis. Many contractors have no projects; we all need funds. Madam Speaker, the government must find its own funds. On the matter of borrowing money, this is a sensitive issue. Tuanku has decreed that the principle of financial management that must be observed is not to spend more than the revenue received. A very good reminder.
Madam Speaker, young people who earn RM3,500.00 take bank loans to buy cars worth RM60,000.00. They are not actually able to afford the car. It is because there is a need, that is, as a vehicle for commuting to work. Of course, the borrower must ensure that he is able to settle the instalment payments. That is an analogy. The state government should consider obtaining funds through bon, loan, or sukuk issuance to drive the state's slowing economy. We need a vitamin injection of funds for many projects that will generate revenue for the government, increase job opportunities, and increase cash flow. Cash flow is not the government's problem; it is actually a worldwide problem.
Madam Speaker, Pemanis would like to propose that the government review the role and powers of J-Corp. At present, J-Corp's powers appear rather limited compared with MBI, Menteri Besar Incorporated, in other states. This includes the power to issue bonds and loans. If there is a need, Pemanis would propose that the government establish an MBI for the state of Johor. At the same time, the Pakatan Harapan government must learn from the experience of the previous Barisan Nasional government, namely that loans put into personal accounts are very dangerous, to the extent that they can topple a government that had ruled for 60 years. That is a bitter and terrible experience for all of us.
Madam Speaker, Pemanis is moved to touch on the Pasir Gudang air pollution incident. It is an incident that appears isolated but has involved the government as a whole. Allow Pemanis to make a conclusion, but do not misunderstand, Members of the House. Pemanis does not fail to support the government even though we are in power; this is a practice of reformed democracy of Pakatan Harapan. We agreed to disagree; the important thing is to benefit the people. And we, the Pakatan Harapan government, are indeed different from the Barisan Nasional government. If compared one to one, of course there is a difference.
Regarding the Pasir Gudang pollution, firstly, this is the second time this has happened within a short period. In the same area, which has existed for nearly 20 years, and among the 2,005 factories operating, 250 are related to chemicals, and most are not new factories. Secondly, in the first pollution incident, the government was already 100% certain of the ground zero, that is, the source of pollution was the dumping of toxic waste into Sungai Kim Kim. Thirdly, the government is still uncertain about the source of the second pollution. Fourthly, the unusual chemicals that could be detected in the air are three. One is methyl mercaptan, a chemical that smells like rotten eggs and has a half-life, t-half. If we are from the medical field, if the substance in the body is at its highest level, it drops to half that level; how long that half takes, yes, that is the t-half. For methyl mercaptan it is short, from 4 hours to 8 hours. This poses a problem; it is a problem when we try to trace it effectively in the blood of victims. The second chemical detected is acrylonitrile, which smells like onion, but not like the gossiping aunt who always used to be fragrant and liked wearing perfume. Microlene smells like burnt fat. All these chemicals could not be detected in the blood of the victims tested, usually after 4 hours or more, and the t-half has already passed. And indeed, from a medical perspective, it is very difficult for us to link these substances with what we found.
The pollution cases one and two have one similarity, although they are different cases; in fact the two cases are not related. That is, both travel through the air, that is, airborne. And for cases involving airborne pollution, the buffer zone separating industrial and residential areas becomes less relevant. It can travel more than 10 km. The core question is not the buffer zone. The question is whether chemical factory operators adopt methods that are efficient enough to control air quality, water and toxic waste discharge? And question number 8 is whether the monitoring and enforcement teams with existing equipment are efficient and effective enough? Number 9, the Pasir Gudang Industrial Area is not a new area; why has this never happened before? And are factory operators becoming bolder and non-compliant, even violating operating conditions, with the transfer of power from BN to Pakatan Harapan, or is it a sabotage job? Or why is there no factory worker involved if the source is from the factories?
Madam Speaker, Pemanis could continue with many more questions on the Pasir Gudang air pollution. There are many why? why? why? yes. But Madam Speaker, Wakil Rakyat, whether from the government or the Opposition, have an important role and responsibility in educating the public, upholding noble values and tracing the truth. While we sit comfortably in this air-conditioned House, there are hundreds of people outside, on the ground, working tirelessly from the hospital to the fire station, from the laboratory to the Department of Environment (JAS), from Johor Bahru to Putrajaya, from morning till night, to find answers related to the Pasir Gudang pollution case. This case is a tragedy and no party wished it to happen. Pemanis would like to take this opportunity to express a thousand thanks to the Most Honourable Menteri Besar, the EXCO members, Honourable Members, the Fire and Rescue Department (Bomba), hospitals, the Disaster Management Committee, local authorities (PBT), JAS, employment agencies and volunteer teams involved in this operation.
Madam Speaker...
Sila gulung.
Yes, just a little more. We are not disappointed if netizens criticise the government even without basis, because that is their right. Pemanis hopes that our friends from the left side of this honourable House will not misuse this incident as a weapon to gain tit-for-tat political mileage. Que Bono, with permission, in Latin means: who benefits.
Madam Speaker, regarding the Pasir Gudang case in particular and Johor's security in general, allow Pemanis to propose that the government install an Integrated Surveillance System that can monitor water quality, air, river water levels, traffic flow, illegal dumping of rubbish, house break-in cases and illegal foreign workers, integrated with a facial recognition system and vehicle plate and motorcycle recognition, and linked with the Royal Malaysia Police (PDRM), local authorities (PBT), the Fire and Rescue Department (Bomba), Immigration and other relevant government agencies.
To conclude the debate on the Motion of Thanks for the Royal Address of His Royal Highness Tuanku Johor, Pemanis would like to share a pantun:
Push the board, pull the board; Keranji fruit in the boat; Come together, friends of Barisan; Facing tragedy, let us stand shoulder to shoulder.
That is all. Thank you.
Thank you, Honourable Pemanis. I invite Honourable Benut.
Thank you, Honourable Madam Speaker. Assalamualaikum warahmatullahi wabarakatuh. First, I would like to take this opportunity to express my highest gratitude for the Royal Address by His Royal Highness Sultan of Johor, Sultan Ibrahim Ibni Almarhum Sultan Iskandar Al-Haj, at the official opening of the First Meeting of the Second Session of the 14th Johor State Legislative Assembly. I also wish to take this opportunity to extend Selamat Hari Raya, and maaf zahir batin to the Honourable Members, state and federal government officers present today.
I would also like to humbly extend my congratulations in conjunction with the birthday of His Royal Highness, Tunku Ismail Ibni Sultan Ibrahim, Tunku Mahkota of Johor, on his birthday on 30 June this year.
Honourable Madam Speaker, I would like to begin my debate this time with a prayer that the Pakatan Harapan government will become repentant, continue to introspect, and realise that it is in fact not easy to administer and lead the state of Johor. The previous leadership laid a strong foundation so that Johor could be made or described as The New Economic Power House, leading Selangor and Penang in various sectors. Honouring the command of His Royal Highness, who wished that the opposition should also play its role to ensure that all government programmes truly benefit the general public and are implemented properly and orderly, clearly gives the picture that the role of the opposition needs to be recognised, as in the Pakatan Harapan manifesto, Honourable Madam Speaker. So, I would like to ask the government whether the government today is ready to improve its efforts to make the Pakatan Harapan manifesto a success. As an example, the Chairman of the PAC, the Chairman of the State Public Accounts Committee, which in the Pakatan government manifesto clearly provides for the Chairman of the PAC to be allocated to the opposition. So, are you willing, able, and open, the Pakatan Harapan government today, to appoint and fill the post of Chairman of the Public Accounts Committee with the opposition? Perhaps the government should seriously consider this if it truly wishes to have a government with checks and balances.
Madam Chairman, His Royal Highness also touched on and emphasised that His Royal Highness, as the chief ruler of the state, will always observe and give admonition to ensure that the administration of the state government runs well, smoothly and in an orderly manner. Therefore, let us look at the period of one year. I have a report on the one-year achievements of the Pakatan Harapan government. We are discussing this matter, Honourable Madam Speaker.
It is evident that in this one year, although the Pakatan Harapan government said that, first and foremost, the post of Menteri Besar would be limited to two terms, not even two terms, Honourable Member, have already been changed. Honourable Madam Speaker, it is not right. The history of a Menteri Besar who did not last even a year is a history, Honourable Member. Playing politics by changing the Menteri Besar so that other state issues fail to be managed, Honourable Member. So, I welcomed earlier the suggestion from the Honourable Pemanis who said that government officers should not be in their comfort zone. Honourable Member, in order to see whether government officers are comfortable or not, first, what is the plan of the Pakatan government now? What is its direction, Honourable Member? (The House applauds.) That is what we want to know, so that when there is a plan, when there is a direction, we can then make a measurement, and then we can have its Key Performance Indicators. Only then will we know to what extent the efforts made by government officers are achieving or not achieving?
Please, Honourable Member, explain to this honourable House, what, what is the government's plan today? What is the plan? Do we simply rely on leading change and carrying the hopes of the Bestari Johor people? Is that the plan, Honourable Member? Is that the direction of the state government today before we say that government officers are in their comfort zone? We on this side also want to see many programmes implemented as the Honourable Member said. How can the government today have no money? We left RM4 billion in the account. Whether the Consolidated Fund or the Heritage Trust Fund. A large financial amount. You should have received allocations to celebrate Hari Raya, no need to cancel, no need to postpone. If there is more, give some to us here on this side, we also have no money. Such a question should not arise. (The House applauds.)
So, Honourable Member, please think, make a clear plan. There should be a clear direction. I am confident and believe our government officers are experienced, enough. Their vision is there, their capability is there to carry out their duties and responsibilities.
Honourable Madam Speaker, the achievement document of the state government's one year under the Pakatan Harapan administration, the state government is proud of its achievements. The post of Menteri Besar is limited to two terms, talk about open tenders, perhaps there is no harm in asking the new EXCO for Public Works (EXCO Kerja Raya), in the sense of these open tenders, where is the Honourable Member's plan to protect the interests of Bumiputera contractors? What is the plan for the discussions of the Honourable Member with the Johor Malay Contractors Association, the Johor Class F Contractors Association? I recall that there is an agency established by the state government, JCCD, Johor Centre Construction Development, which was set up so that a framework of future direction for Bumiputera contractors could be developed. Well, let us accept the intention to develop open tenders. But where, Honourable Member, is the plan to protect the interests of Bumiputera contractors? Is it something no longer important to the Pakatan government today? Or does the government today feel that, the 4th Prime Minister too, in 22 years, Madam Speaker, 22 years leading the nation, at the end also said that I failed to advance the Malays. The 4th Prime Minister admitted it, so if the Pakatan Harapan government also does not achieve what it targeted, do not worry. The former Menteri Besar, in my view, do not worry, its' ok. If one cannot even lead change, the 4th Prime Minister too after 22 years could not change it. So, failure should not be placed on the former Menteri Besar.
Honourable Madam Speaker, I also begin my debate this afternoon by first touching on the statement by our leaders, that the Johor State Constitution is void. Since that announcement was made, we have been searching, searching for where the Pakatan Harapan leaders, especially the head of the state government of Johor, are. The position of the state of Johor towards this statement, which I think is so baseless. If the Johor State Constitution, enacted in 1895, is void, where is the basis on which we sit today? The Menteri Besar himself took an oath upon the sanctity of the Johor State Constitution. If the federal government, federal leaders say that this Johor State Constitution is void, Honourable Madam Speaker, what are we doing here? So, Honourable Member, what is the state government doing? Speak up. This is important for us in Johor, for the people of Johor. (The House applauds.) Speak up. We cannot just remain silent, hiding in meeting rooms. Come out, say what the position of the state of Johor is, the state leadership of Johor, regarding allegations that I think are not baseless at all, Honourable Madam Speaker. Well, today we are sitting, the opportunity is here, for us to take a stance that we all uphold and stand firm under the Johor State Constitution. I suggest the state government take a firm stance in this House and do not forget to also state that the Prime Minister's statement is totally inaccurate. (The House applauds.) You must, Honourable Madam Speaker, you must speak. Because this originated from there. We must go to its root first so that we can debate other matters.
Second, Honourable Madam Speaker, Johor must be Johor. That is important. Pulau Kukup was once brought as a motion by this honourable House. Because we debated the status of land, whether it changes from government land to Sultanate land. Sultanate land is not individual land, Honourable Madam Speaker. Even if the federal government does not want to provide allocations to develop the National Park, is the state government so poor that it cannot develop a State Park? We have never changed, we have agreed that the Pulau Kukup National Park remains as the site of the National Park. If you do not want it to be a National Park, make it a State Park. We have the enactment, we have the money. Develop it. So, what is the state government's plan towards the effort to make the Pulau Kukup National Park a success? Kuala Lumpur only wants to revolve around politicising the status of land, there is no need, Honourable Member. There is no need for us to worry about the status of this land, implement it. Lower the allocation, correct it, add more activities so that the State Park is far greater than the National Park developed by the federal government, compete. Johor, Honourable Madam Speaker.
Second, on the same matter, the RTS. RTS. I spoke to a strong figure of the PPBM party during the opening of the House, asking that you help us in Johor, do not delay the RTS project, do not postpone it. Do not deliberately drag out the development of this RTS. Because the issue is about land, going back again to land. We do not face problems in terms of handing over land, why must the federal government try to distort facts, try to magnify small issues so that the development of this RTS is delayed? My friend from Stulang has produced a very extensive working paper, for reference, for investigation, the congested Causeway Johor. One of the solutions to the congestion, the congestion of the Johor Causeway, is through the development of the RTS project. Is that not so, Honourable Madam Speaker? So why should we allow the federal government to delay this project on the basis of land, which is said to belong to certain people, has been taken by certain parties, making the price of this project soar so high?
Honourable Madam Speaker, during the Barisan Nasional era we were informed that the development of this RTS was a joint venture. 70% borne by the Singapore government, and we 30%. Only 30%, Honourable Member. Singapore is already finished, the infrastructure to receive this RTS project is ready, we have not even started. Delaying, we want to quarrel because of the land issue. The planning has been done, the station locations have been determined, just implement it, Honourable Member. If the Honourable Member wants to enter as a project operator, perhaps that is also possible, Honourable Madam Speaker.
Is that so? But can't one do something with land that isn't one's own?
Yes, you can, if the Honourable Member has 3% or RM3.0 billion, what's wrong with that, Honourable Member? They say the project will cost RM10 billion. RM7 billion is spent by Singapore and we only RM3 billion. The Pakatan Harapan government is able, has plenty of money, so do not later, when there is an election, give money, Honourable Member, do not keep it. Give it now. Carry out projects, it is not as if we give it to BRIM or to other programmes. The RTS is needed, Honourable Member. 10,000 workers can be carried every hour. Just imagine, 70,000 motorcycles every morning, 100 vehicles that have to enter Singapore every day. To build a pedestrian walkway is not a solution, Honourable Member Stulang, Singapore objects. Many times we have proposed it. We build this pedestrian path because it touches on the matter of security. We are not capable, let alone our Prime Minister now with the Prime Minister of Singapore, I do not know what their relationship is? Even in the past, the good relationship between two Prime Ministers could not resolve it. It cannot be done. We cannot even build a water taxi, because the other side is a sovereign country, they place the security of their nation as a priority. What can we do? Two countries must agree on what is to be done at the Johor Causeway, we cannot agree alone or they agree alone, it is bilateral understanding, both must agree. Not unilateral. So, therefore, quickly, Honourable Member, Pulau Kukup is waiting, there is no reason because it cannot be developed as a State Park, and the RTS is also a project of very high value to the people and must be implemented. If you do not help us here, at least help YB Stulang, because he wants to see the Causeway's congestion problem resolved.
Honourable Madam Speaker, one more thing that I think the state government must speak up on. Do not remain silent. If the federal government wants to set up a committee, Honourable EXCO for Religious Affairs, if the federal government wants to form a multi-racial, multi-religious committee to assess or review the Islamic education syllabus in national schools, be careful, Honourable Member, do not let anything like that happen in Johor. That is the first responsibility of the Honourable EXCO for Religious Affairs. Defend it, do not let that happen in the state of Johor, Honourable Member. (The House applauds.) We are proud of Johor because we have a religious school system that has been so long established, so comprehensive, and so exemplary to other states. The religious education system of Johor is so excellent in our nation. If this happens in Johor, in the national schools in Johor, oh Honourable Member, we would have to take off our songkok, Honourable Member. It seems that your songkok and mine, your songkok, is even higher, surely full of ideas. Do it, Honourable Member, do not not do it. Do not let us allow this, Honourable Member, do not let us allow this matter to reach the state of Johor. What is it called, indeed, Honourable Member, since I have strayed into referring to the Honourable EXCO for Religious Affairs, if we cannot go to national schools, if we cannot go to national schools, then it is fine, we go to religious schools. Include the subject of the History of the Johor Sultanate in the religious school education system in Johor, Honourable Member. (The House applauds.) Why? Because we see that today, what is happening on social media today seems to show no respect at all for the royal institution. Many issues arise, many matters are stated, so to strengthen the position of the History of the Johor Sultanate, we must support it so that it becomes part of the school teaching syllabus or subjects in religious schools.
Honourable Member, set up a committee, a Royal Historian, a historian, when Professor Khoo Kay Kim, the late Professor Khoo Kay Kim, we felt a great loss, an entrepreneur and historian who knew about history. So in Johor we also need a historian who can truly bring forward the history of the Johor Sultanate. So for this to continue, we include it, we insert it as one of the subjects in religious education in religious schools across the whole state of Johor. This is important, Honourable Member, as important as can be.
Fourth, Honourable Madam Speaker, I would like to emphasise once again on the matter that the Pakatan Harapan government is very pleased that RM189.38 million has been removed from the federal government's debt, namely the water debt.
Honourable Member, we have shifted from what we were in 1989. We had the Water Division of the JKR starting in 1989. Then after that we had the Water Supply Department. In 1994 we corporatised it. Honourable Member, we corporatised the Water Supply Department, and then in 1999 we privatised it. Honourable Member, what happened when we privatised it? The federal government seemed to sulk with us because we privatised it. When we privatised it, we spent to develop a more sophisticated water supply system in the state of Johor. We borrowed from the federal government RM689 million, we borrowed from the World Bank RM186 million, we borrowed from the development bank RM107 million, we borrowed from the Employees Provident Fund (KWSP) RM300 million. All of it, Honourable Madam Speaker, RM1.283 billion. In truth, Honourable Madam Speaker, this RM1.283 billion was for developing water resources, which is the responsibility of the federal government enshrined in the Constitution. We have discussed it with the ministry in detail. Honourable EXCO for Public Works, eh, Honourable EXCO for Utilities. He is not there. We have discussed in detail with the ministry, not just to cut RM189 million, but we are entitled to a deduction of nearly more than RM1 billion. Not RM189 million, Honourable Madam Speaker. There is a great difference.
But what's strange is why didn't you apply before?
Well, the Honourable Member took that place first, otherwise we were going to continue already. We have discussed it, government officers have toiled day and night checking the records from 1989. How long, Honourable Member? All the information has been collected. Already...
But, but don't worry, if we get that figure, we will work on it.
Please, Honourable Member. I have brought this with me, and I will hand it over to the Honourable Member shortly. But Honourable Member, please, um, tell
the EXCO for Utilities not to be absent when I speak. He knows I always want to bother him about this water matter.
Secondly, Honourable Member, apart from settling this debt of RM189 million, the former Menteri Besar said he wanted to set up a new water company. Honourable Member, enough, let us not dig yet another hole, all right. Setting up a new water company is not the solution, Honourable Member. Increase our equity stake in the existing water companies. We only have 20%. Increase it. Syarikat Air Johor is one of them, and it is the only one in the whole country that is privately owned. All the other states' water companies are owned by the government. In our plan, yes, this plan of ours, the Dekad Baru Johor, clearly states our intention to increase our equity stake in Syarikat Air Johor so that we have more voice, we have more power, and, more importantly, we obtain returns on equity greater than what we have received all this time. What we have received is really not commensurate with what it should be. Let us make it happen. I think the Pakatan government that we have today has the strength to make this happen. But it must be pushed.
Honourable Member, the Most Honourable Menteri Besar must go overseas to look for investment, or to look for loans and so on, so that we can increase our equity. Do not send only the EXCO for Investment overseas. To find investors, the Menteri Besar must go along. Surely not him alone. Let us go back and read. I want to know too: up to today, the EXCO who have travelled abroad a lot to seek investment, how much has actually come in? They say, it was promised, there is a possibility of this much, this amount, such and such investment, such and such type of investor, but what is substantial? With permission, Honourable Member, Madam Speaker. It must be…
Sila gulung.
Kena…
Please wind up in 4 minutes.
Oh dear, please wait a moment, Honourable Member. I was just about to respond to the challenge from YB Pemanis just now, about how he seemed to caution us not to politicise the matter of the Sungai Kim Kim here, in Pasir Gudang. Don't worry, Honourable Member. We will not politicise it. That is why we submitted a memorandum on behalf of 23 NGOs. We were not offended either, because we did not engage in politics. Honourable Member, I know we have a reason, which is why we chose Wednesday to submit the memorandum, because that day was the EXCO meeting day, and the Most Honourable was in his office. We were downstairs waiting for him, but he only sent his PA to receive it. Because we are not engaging in politics, we do not mind at all. What is important is that the message gets through.
Honourable Member, I agree, Honourable Member has already said a lot. I was going to say it, the mover said it, the supporters said it, so I will just add. Our memorandum, Honourable Member, reads, „That the state government must take responsibility for its failure to carry out its mandate after the first toxic incident occurred. So the government must take responsibility for the failure. First, admit that you made the mistake. The state government must immediately table a plan and strategy for disaster management, including disclosing the list of culprits, who exactly are the parties involved. They must already have been identified. We cannot just answer the people by saying there was a strange gas, a mysterious gas, a bizarre gas, or whatever. The Minister, what's his name, the Minister for the Environment, told us. Honourable Member, you are also a doctor, you have said so earlier. I am very impressed with the Honourable Member's knowledge, but take action against the parties who have been identified. Surely they cannot fail to identify them. Honourable Member also knows what the gas was, what its effects were, what the countermeasures for humans are.
Thirdly, form a special task force, urgently, to manage, handle and monitor this entire case. Form a special committee.
The fourth point is that if the government is truly responsible, whoever is entrusted with this duty, please do not make media statements, Honourable Member, I am ashamed, I too am a Johorean. The Most Honourable Menteri Besar has already made a press statement, has already done it, and two people have done it already, that is enough. It goes viral, people nowadays, you know how it is. Everyone wants to have their name in it, EXCOs also want to have their names in it, they want to ride on the glamour too, goodness. Please, not like that, Honourable Member. Today we also find it strange, Honourable Member, Perlis brought it, eh, Perlis again, Honourable Permas moved a motion, my friend asked me to say, he said, the representatives of the government found that the government failed to handle the pollution issue, so that the representatives of the government urged the government, that the government take action against the government to resolve the issue faced by the government. Ah, government, government, government. Just do it, Honourable Member, solve the problem at Kim Kim. We have no time to blame anyone.
My friend in the end, Honourable Member for Rural Development, why has the appointment of village heads been politicised? 90% of the new village heads were appointed simply because the old village heads were strong UMNO supporters. Honourable Member, that is not right. According to Dr Sherina Abdul Rahman, Visiting Fellow from the ISES Yusof Ishak Institute, a research body based in Singapore, Honourable Member. That research found that the reshuffle of village heads under the Pakatan Harapan administration has made life difficult for the fishing communities and village residents in Johor in general. Ah, that is a study that was done. Honourable Member may begin doing a study: these 90% of new village heads, what are their achievements…
YB Benut…
What is their position today?
One more minute.
Honourable Member, Madam Speaker. Madam Speaker, yes, right, isn't it? I wonder, how is the performance of our village heads today, Honourable Member? Honourable Member can name a good village head, that's fine too.
Finally, Honourable Member, Madam Speaker, earlier I already strongly requested the Most Honourable Menteri Besar to reconsider the intention to review taxes. Next year the economy will not improve, the world economy will become even more sluggish next year. Therefore, if we want to review taxes again, let alone raise industrial taxes, it is not a wise step. I urge the government to think carefully, to look for other measures to increase state government revenue, because truly, when His Royal Highness says not to spend more than what is received, Honourable Member Pemanis, perhaps Honourable Member, His Royal Highness also did not think about us, Honourable Member. Why is His Royal Highness not confident that we have plans, that we are able to develop the state's economy, perhaps His Royal Highness is not confident. That is why he said not to spend more. It is not a royal command that we feel we must uphold. I am confident that if we prove that we have plans, we have a robust economic programme, even if we spend more than revenue, I believe in the end it will bring big, substantial returns to the state government. So, we must look at it from that angle, Honourable Member, Madam Speaker.
Finally, sorry, Madam Speaker, yes, okay, I will throw all of this away, throw, throw, throw…
Banyak akhirnya…
We in this opposition bench always give views and criticism, as long as the government listens to and respects those views. We do not want to pour water on taro leaves, Honourable Member. There are many taro leaves in your constituency, Honourable Member. No, we do not want to pour water on taro leaves. The fact is the government must treat and cure the problems that arise. I use the word treat, cure, because the Menteri Besar is a doctor, Honourable Member, Madam Speaker. The sufferings of facing the cost of living must be treated, the suffering of the people crowded at the Johor Causeway must be treated, the hurt in the heart over tolls, and PTPTN not being abolished, must be treated, the suffering of the people from the lack of clear planning by the state government, and many others, Honourable Member. This government's job is to treat. Then there is a doctor, my friend, who finally said to me, Honourable Member, what is his name, he said, Honourable Member, sometimes, sometimes the one who treats also needs treatment. Yes, Honourable Member, and often, always, it means, Honourable Member, usually the one who treats is the hardest to treat. The hardest, difficult, the doctor, when we say he is ill, he is not, it is difficult, Honourable Member, yes, because he knows everything.
Never mind, see a specialist.
(Laughter). Thank you, Honourable Member, yes. I hope we all face the year 2019 with greater confidence. As the opposition, we will continue to play our role and continue to pray that, God willing, we will continue to contribute to the progress of the state of Johor, insya-Allah. That is all, thank you. Assalamualaikum warahmatullahi wabarakatuh.
Thank you to Honourable Benut. Honourable Members, I adjourn this sitting until 2.30 p.m. this afternoon.
The sitting was adjourned at 1.10 p.m.
The sitting resumed at 2.30 p.m.
Honourable Members, the sitting has resumed. Honourable Members, I would like to remind all Honourable Members that other Members of this House will be given 15 to 20 minutes. I invite the Honourable Kahang.
Salam sejahtera, salam perpaduan, salam Muafakat Johor. Mr Speaker, first of all I would like to thank Mr Speaker for allowing me to take the opportunity to move the motion of thanks to His Royal Highness the Sultan of Johor on the occasion of the Official Opening of the Second Meeting of the 14th State Assembly.
Mr Speaker, first of all I take this opportunity to congratulate Honourable Bukit Kepong on his appointment as the 17th Yang Amat Berhormat Menteri Besar of Johor recently. Our hope is that, with this appointment, the Yang Amat Berhormat and the new Johor State EXCO line-up will make the interests of the state, the economic prosperity and the welfare of the people of Johor their main agenda.
Mr Speaker, recently I read a report on the one-year achievements of the Johor state government under the administration of Pakatan Harapan. In it, the government listed all the promises that had been implemented within the period of one year. Thank you for the report, but I wonder what the yardstick is for the achievement of each promise stated. Does it only focus on the large number of beneficiaries, so that it is counted as an achievement, and is it also one off, with permission. And the report also states that the state government will increase the transparency and efficiency of the public service and improve governance at all levels. However, it does not state how, and what system the state government intends to adopt to improve the delivery system under this new leadership. What is the yardstick for the achievement of each EXCO under the Pakatan Harapan administration? Or is the achievement that is proudly claimed only at the level of rate, merely fulfilling 10 promises within a hundred days.
For the information of Mr Speaker, the previous Barisan Nasional government once established a unit called Impress, which was tasked with monitoring the performance of each EXCO and their portfolios. Furthermore, the previous EXCO line-up would be evaluated on their achievements through the presentation of reports on their respective portfolios at the EXCO Away Day or EXCO retreat, which also involved state departments, agencies and state government GLCs of Johor.
Therefore, this would indirectly ensure that every EXCO and civil servant cultivates a transparent system of administration and delivery in fulfilling the trust that has been entrusted to them. Thus my suggestion is, is there a report card system for each department, let there be a report card system for each department and agency presented by the EXCO so that the people are also aware of the achievements of the EXCO line-up and civil servants in every department and government agency, namely the KPI System.
Madam Speaker, Pemanis just now stated that Pakatan Harapan is indeed different from Barisan Nasional. I agree, it is indeed very different because today Pakatan Harapan will hold negotiations with its own government regarding the problem that occurred in Pasir Gudang. And I believe this matter is very critical because this morning, once again, an incident occurred in which about 130 students and teachers were again affected by the pollution that happened in Pasir Gudang today. So, in my opinion, these negotiations clearly show two things. Firstly, whether the state government's competence in managing this crisis is being questioned by their own Wakil Rakyat, because we are aware that this is a critical issue, an issue that needs to be given attention immediately, but it is still being delayed or there is no concrete action, to the point that their own Wakil Rakyat feel that no aggressive action is being taken to resolve this issue. Where they question the competence of their new Menteri Besar, do not change him again. And or is there Pakatan Harapan with two teams, to the point that they have to tarnish each other. And are forced to hold negotiations. So the answer may lie with the Honourable Members over there.
Madam Speaker, in the last term, in the previous sitting, I also raised issues of FELDA in the state of Johor. That is, after almost a year of Pakatan Harapan governing, FELDA settlers are still plagued by the same issues, even though the FELDA White Paper has already been tabled. What is the actual fate of FELDA's people? And, not to mention the responsible minister, namely the Minister of Economic Affairs, also has his own problems now, and recently the Chairman of FELDA also announced he would resign, if I am not mistaken effective yesterday, he has resigned. So what is the fate of the settlers in these FELDA areas. In the FELDA White Paper that has already been tabled by the Pakatan Harapan government, among the proposals tabled to empower the new generation is through improving the quality of education and the identity of the FELDA generation, through schemes, skills programmes, TVET and so on.
Therefore, in this regard, I would like to ask what plans and initiatives the state government has in helping to improve the welfare of FELDA children. Because we are aware that FELDA children in FELDA areas must also be given appropriate attention, and this is also a commitment that has already been given by Pakatan Harapan through the White Paper that has already been tabled. So we want to know what initiatives have already been implemented up to today and at the state government level, do not just rely solely on the federal government. What are the state government's initiatives to ensure that skills programmes can be brought to the children in FELDA areas, and as for the information of Honourable Mr Speaker, in Budget 2018 under the Barisan Nasional government, we had a special fund, a special skills fund for FELDA children to pursue their education amounting to RM1.5 million that had been set aside for them. So whether such initiatives will again be carried out by the state government, or just wait for the federal government to bring initiatives to ensure FELDA children acquire skills.
Mr Speaker, according to the classification of occupational standards in 2018, there are only 60,000 skilled workers in agriculture, forestry, animal husbandry and fisheries in the state of Johor. Only 60,000 people. So I believe the state government is able to finance skills training for FELDA children and such investment will give the government the return of investment because this is something worthwhile. We must ensure that we train the generation in Johor so that they can run businesses or obtain employment with a commensurate salary later. So one of the suggestions I can put forward is to make FELDA in the state of Johor an agro-tourism centre, which can indirectly create job opportunities for FELDA children.
Mr Speaker, we must ensure that skills in managing plantations are also honed as their potential to be competitive. All this is very important, Mr Speaker. Next, I studied the achievement report of the one-year Pakatan Harapan government regarding the issue of the FELDA Second Generation Houses. I also raised this issue in the previous sitting. For the information of Mr Speaker, in my constituency there are actually six FELDA schemes, but after, before the last election, when there was a redelineation, one FELDA had entered the PALOH area. So there are five, but we consider it as six too. A total of 550 housing units. Okay. They should have been built. But up to today, it is still stalled. I also read in the achievement report, page 16, which shows that improving the welfare of 1,253 FELDA Second Generation residents of Lok Heng has already been offered house lots, so congratulations, but what about FELDA in the Kahang state constituency. So I hope the relevant EXCO will pay attention to this issue because it has already been stalled or delayed for more than a year. So apart from the housing issue, infrastructure issues such as the installation of street lights at the junction of the entrance roads to FELDA Ulu Pengeli, FELDA Bukit Tongkat and also FELDA Ulu Belitong have still not been resolved. I have brought it up twice in the sitting but it still has not been resolved. I think the cost is not, not too high, but I do not understand why the relevant parties still have not taken action because it involves the safety of residents. We do not want a situation where there are accidents, loss of life and so on before action is taken to install lights at the very dangerous junction in the area.
Mr Speaker, I also want to raise issues relating to the Indian community. I am rather confused because indeed the Pakatan Harapan government has given many hopes to the Indian community that they will be given appropriate protection, but I see in the state of Johor, I am confused because there seems to be no focus on issues related to the Indian community. Who is actually responsible for looking after the affairs of the Indian community in the state of Johor. There is indeed no agency, and at the same time old issues are still delayed, among them is the Indian community's charitable land, I think Mr Speaker is also very synonymous with this issue because he once submitted a memorandum to me when he was in the opposition asking for this issue to be resolved immediately, but today, up to today, it still has not been resolved. The land that had already been identified earlier with the allocation already available, with the selection of contractors all already there, then until the elections it could not be resolved, the Pakatan Harapan government should have resolved it, but the Pakatan Harapan government took about 9 months and finally decided to reject the identified land. The government agencies that had earlier agreed the land was suitable, could be built at that location, today issue statements as if it was not agreed by MMK.
So, this is the excuse given by government agencies or the masterminds of the Wakil Rakyat who did not agree that the area be made the Indian community's charitable land. So, the former Yang Amat Berhormat Menteri Besar came down with a very strong team, two or three EXCO members, officers came down, wanting to see the area. Then promised that this matter would be resolved, but up to today it has not been resolved. The Menteri Besar has also changed, still not resolved. It has not been brought to MMK yet. So when will it be resolved. And what I find strange is that there is no one who actually pushes this matter at the government level. People must bring it, bring focus as a KPI to resolve it. But up to today it has not been resolved.
Likewise with the issue of the Tamil National-Type School Seri Alam. The school that has been built should have opened in January, last school session, but up to today it still has not been resolved. It cannot be opened for students to begin lessons there. So what is the issue? Who should bring these issues up in the Action Meeting, in the Council or in the EXCO? It must be resolved. If there is no one who wants to bring up this issue, then the opposition must bring up these issues. So rather than them sitting there, it is better that we are in the government.
Likewise with Sekolah Ladang Sembrong SJKT Ladang Sembrong. This school has a school with few pupils. And, most of the students who study there, namely in the estate, are students who live in housing estates, just to save the school. So the PIBG, LPS and the relevant parties made a decision, the school licence was moved to an area with high population density. So we see the Senai area needs a Tamil school, so we proposed a lot at airport city near airport city which is a school reserve so that the school could be relocated there, but this too has already been rejected by the relevant parties. So, up to today, the school cannot be relocated. The land was not agreed upon, if the site is not suitable then look for a new site because the population density of the Senai area is very high and really needs a Tamil school, because today most students in the Senai area have to go to Sekolah Tun Aminah or to Mutiara Rini to get education. So if a school is built in the Senai area near the airport city site we proposed, it will facilitate the community. So I hope the relevant parties will take action to resolve this issue.
Madam Speaker, I also want to raise several temple sites whose sites have already been identified but up to today still have not been brought to Hasil Bumi for approval by MMK. So I ask the PTDs, especially in the Johor Bahru district, to re-examine those files, re-examine the files that are still delayed, bring them to PTG to be brought to MMK for approval because all these sites were agreed upon before. So why the delay? This is why when no one wants to push these matters, the files will be delayed. So I hope the relevant parties re-examine who is responsible for looking after the affairs of the Indian community in this state of Johor.
Madam Speaker, likewise with issues relating to, I understand that in Budget 2019, RM1.5 million has already been set aside for the improvement and also repair of Tamil schools in the state of Johor. So I also want to know the list of which schools actually benefit under this programme that
has already been announced in the 2019 Budget by the Pakatan Harapan government for the Indian community.
Madam Speaker, this relates to the proposal of a clever Minister who supposedly wants to bring in workers from African countries to work in Malaysia. Indeed clever. So first he made a statement as if a decision had already been made. When people started to be pressed on social media, people began to get angry, it was said this was only a proposal. This is indeed a U-turn, he is indeed very good at corner lipat. What is the need to bring foreign workers from Africa to work in Malaysia, when many local children are still unemployed. Employment opportunities and the uncertain economic situation have not had a very positive impact, causing job opportunities to decrease further. So, in situations like this, we must help local children. It is true that perhaps many local children are not interested in working in the plantation sector. But we must use programmes to provide encouragement, provide incentives and also modern methods in plantations must be taught to them so that they develop, obtain education and also work experience in the plantation sector, and eventually there will come a situation where they can manage the plots, orchards and also plantation areas and so on. Concrete action must be taken. We already have many problems with foreign immigrants. In the state of Johor I am not sure whether there is a task force or not for foreign workers. We need one to monitor the movements of foreign workers in this state of Johor. We want to reduce dependence on foreign workers, not encourage foreign workers any further. So the action to bring them from Africa and other countries, I do not know where he got the idea to bring such things. I hope that in the state of Johor we do not take such actions, because in Johor we do focus on work in Johor being for the children of Johor. We must ensure that any economic spill-over opportunities that occur in the state of Johor are for the children of Johor.
Sila gulung.
So we must act, we must be firm on issues like this. Do not simply follow the Minister blindly on issues brought up by the centre to the point where we accept their decisions, and in the end we see many African citizens among us. We do not want that situation to happen. So we must make sure, because Pakatan Harapan is certain in the Buku Harapan (Pakatan Harapan's manifesto), page 98, promised to reduce the number of foreign workers in stages and to create 1 million job opportunities for the people of Malaysia. So, where has it gone? If that really is the commitment, to reduce dependence on foreign workers and increase job opportunities, then what is this Minister doing? Does it not contradict what Pakatan Harapan promised? So these are the matters we must ensure. So, I hope we focus on skills training. We focus on job opportunities and at the same time investment in the state of Johor must be enhanced. Only then will we continue to be The New Economic Power House of Malaysia. Otherwise, we promise one thing, say another in the book, and the reality is different. We will become what people call, what is it, "kaki kencing" (literally "urine feet"). People will say this government is "kaki kencing". Let us not become "kaki kencing", otherwise what will happen in the end? Urinate there, clean up here. Urinate there, clean up here. That is what will eventually happen. So, I hope this situation does not happen. I will ensure that the government remains committed to the promises that have been made...
1 minute left.
We must make sure to reduce the unemployment rate in the state of Johor. That is all. Once again I thank Madam Speaker for the opportunity given to me. Thank you.
Thank you to the Honourable Member for Kahang. Next, I invite the Honourable Member for Skudai.
Peace be upon you, Salam Harapan Johor, and also Selamat Menyambut Hari Raya Aidilfitri, and I apologise, zahir and batin, to the Honourable Muslim Members who are celebrating Hari Raya Aidilfitri. Thank you to the Honourable Speaker for the opportunity given to take part in debating the Debate on the Motion of Thanks to His Royal Highness the Sultan of Johor for the Royal Address on the Occasion of the Official Opening of the Second Session of the 14th Johor State Legislative Assembly.
Honourable Speaker, for more than a year Pakatan Harapan has taken over the reins of power of the Johor state government. Alhamdulillah, thanks be to God, in the past year various pro-people efforts and policies have been implemented to convince the people that Pakatan Harapan is capable of administering government professionally and bringing happiness to all the people. However, those efforts have been belittled by the side over there. Perhaps I would like to borrow a word or two from the Honourable Member for Benut just now. The Honourable Member for Benut just said, "„yang merawat itu juga perlu dirawat‟" (the one who treats also needs to be treated). The one who treats, sometimes, or most of the time, is difficult to treat. So when it is very difficult to treat, the people have voted to pass judgment on those who are difficult to treat. That is why they sit on that side over there. And many problems have been raised by 2 Honourable Members,
the Honourable Member for Benut and the Honourable Member for Kahang, who took part in the debate earlier, to the point that the Honourable Member for Kahang gave a term which I feel may be less polite and less suitable to be used in this honourable House, namely he said "„kaki kencing‟" (urine feet). But he forgot, whether consciously or unconsciously, that many of the problems mentioned earlier were actually urine left behind by him before, which now, since the places have changed, we have to clean up their urine. For example, the problems of FELDA, the problems of land issues and school issues raised by the Honourable Member for Kahang, are those new problems, are they new issues? Certainly not. They are old issues which, while they sat on this side for 60 years, could not be resolved. Yet they expect Pakatan Harapan to solve them, to clean up their urine within one year. Is this fair? So, the government side, Pakatan Harapan, we are always open to any criticism or any suggestions, but let them be constructive suggestions. Just as our side did, when we sat in the opposition, we put forward many constructive suggestions and some of them were adopted to improve governance during their administration. But now, when we sit on this side, insya-Allah we will implement them so as to achieve happiness for all the people of Johor. Don't trouble yourselves, if they still have not understood or adjusted to being the opposition, I can give them one hour of free tuition. If it is more than one hour, then they must pay.
Honourable Speaker, may I interrupt. I want to ask.
Sorry, please sit down. If you do not understand the Standing Orders, read them first. Please sit down, please sit down.
Sila duduk.
I am also invoking the rules of procedure.
Duduk.
I am also invoking the rules of procedure.
No slander, please sit down.
These are the rules made by the Honourable Members who sat over there in the past. Do not make complaints, saying whether these rules are not correct or anything. I agree they are indeed not correct, but we are in the process of correcting them. That is what was said just now, the urine just now, is being cleaned up by us who sit here.
Honourable Madam Speaker, the Honourable Members just now were very preoccupied with the EXCO report card and so on. Do not worry, we always ensure our EXCO will perform, will deliver. If they do not deliver, what will happen, like me, they will be replaced. Clear. So do not worry. So, the side over there just now was very worried, saying there are ADUN, government ADUNs who raised the Debate and so on, but in fact this shows the openness of the Pakatan Harapan government. We sit in this honourable House, we bring up the people's issues. Now, we give the opportunity for the side over there to together discuss the crisis we are facing now. Unlike before, when we tried to bring a Debate to discuss the people's issues, the side over there would try to pressure, would try to obstruct. But this did not happen in the present time. Because the present government is an open government. It is not a matter of "team", how many teams. Why bother? I was told the side over there now has only one team, namely the "team batu api" (the flint team). A team that only causes trouble. A team that looks for issues, looks for problems. Let it be...
Skudai, please watch your words.
Thank you. Honourable Madam Speaker, we acknowledge, we acknowledge that no human being in this world is perfect. Only God is perfect. Therefore, no government will become perfect. But we must strive towards perfection. We must strive towards perfection, and that requires cooperation from all parties. So, Skudai humbly asks the side over there to forget their glory in the past, and remember that now the reality is we have swapped places, so they must play the role of a professional opposition. A responsible opposition. Do not just belittle, just belittle the efforts of the government and merely look for issues. We acknowledge that the efforts implemented over the past year may not yet be enough to further strengthen the people's support for the new government and to ensure the government's victory in the upcoming general election. It may take place within another 4 years. We must realise that the change or transfer of power that occurred on 9 May last year happened because of the demand of all the people to claim change in our country, as they had grown tired of the behaviour and leakages that occurred under the side over there. Therefore, we must convince the people that Pakatan Harapan is always committed to bringing change and reform for our beloved homeland to guarantee the happiness of all Malaysians. Accordingly, we must ensure that the weaknesses and leakages in the administrative system caused by the previous government can be corrected as quickly as possible. Alongside this, we continue to implement various people-friendly policies.
Honourable Speaker, the government must show a high commitment in reforming the administrative institutions, especially in an effort to strengthen the role of the State Legislative Assembly, which plays an important role in checking and balancing the power of the Executive. The government must take steps to restore the dignity of the State Assembly as a legislative branch equal to the Executive branch. For this purpose, the State Assembly should be free from executive influence or restriction. The situation where the State Assembly shares the same Secretary with the State Executive Council (MMK) and its finances are controlled by the MMK should not be continued, because such a situation gives the impression that the State Assembly is placed under the MMK, the State Executive Council. Even more sadly, there are those who describe this State Assembly as merely one of the departments under the government. Therefore, this situation must be corrected; the management and administration of the State Assembly should be carried out, if not by the Speaker himself, by a State Assembly Management Committee chaired by the Speaker of the Johor State Legislative Assembly.
To enable the Secretary to focus more on the affairs of the House, the House Secretary and the MMK Secretary should be 2 different persons. It is pitiful when I see, I observe, Hajah Shu, taking one salary but working at two places. Financial administration for the State Assembly should also be allocated within the State Assembly. Thus, Skudai proposes that a fund be established specifically for the use of the State Assembly. The use of this fund will be determined by the aforementioned State Assembly Management Committee, and this matter can enhance the dignity of the State Assembly as a branch of government that should be free from Executive control. At present, any expenditure by the State Assembly is determined by the Executive side and must obtain prior approval from the MMK. This has indirectly placed the State Assembly under the MMK, and this situation does not reflect the position of the State Assembly as the legislative branch of government which should hold a position equal to the Executive branch. To ensure the State Assembly can function smoothly and free from Executive influence, it is proposed that a portion of the Annual State Budget be set aside for the purpose of this fund. For example, as an example only, if possible increase this allocation, namely 10% of the State Budget be allocated specially for the use of the State Assembly, and its usage will be determined by the aforementioned State Assembly Management Committee.
Honourable Speaker, while we study the suitable way to implement the reforms I have proposed above, we need to place emphasis on small reforms to ensure the Johor State Legislative Assembly, which has the longest history in Malaysia, does not fall behind, and indeed we must continue to move forward and become an example to the other legislative assemblies in our country. We need to bridge the gap between the public and the State Assembly as a whole. Until now, ordinary people have considered that the affairs of the House are far from them, even though most of the matters debated in the State Assembly are policies and laws that are closely related to and have a profound impact on their daily lives.
Among the reasons that cause this perception include that people find it difficult to have access to the affairs of the State Assembly compared with the proceedings of the Dewan Rakyat. The situation in the Johor State Assembly appears to be much worse in terms of public access. We are always proud of the achievements of the state of Johor, which has always been ahead and a pioneer among the other states in Malaysia. Among them, including the Undang-Undang Tubuh Kerajaan Johor, proclaimed in 1895, which was the first Constitution in Malaysia, marking that Johor was the first state to establish a modern system of government administration in Malaysia. We must ensure that Johor always remains a pioneer and becomes an exemplary model to other states.
For that, the digitalisation of the Johor State Assembly must be implemented as soon as possible, whereas many other State Legislative Assemblies have implemented it much earlier. It is rather unreasonable that the historic state of Johor does not have, does not possess, its own official website. Therefore, the Honourable Speaker is requested to take this matter seriously and establish the official website of the Johor State Assembly as quickly as possible. At the same time, the government is proposed to digitise and upload documents such as the Official Report of the State Assembly sittings, Bills, the Government Gazette and the reports of committees, as well as other related documents to the website for public reference.
The digitisation of these documents not only facilitates the public in making reference and research on government policies, but at the same time can also enhance the spirit of togetherness among the public with the government. Indirectly, this can further bridge the gap between the people and the government while enhancing the government's image. Thank you to the Speaker for the addition of 30 minutes to each question-and-answer session. Skudai humbly requests that, if possible, the question-and-answer time be increased further, so that more questions closely related to the problems of the people can be answered and discussed in this honourable House.
Please wind up, please wind up.
Honourable Speaker, if permitted, I just now borrowed time from Yong Peng, if permitted. Honourable Speaker, more than 200 oral questions have been raised in every sitting of the House. However, we can see that, even though the question-and-answer time was increased by 30 minutes, sorry, question-and-answer session, when we say, want, want to be quick, this is what happens. Even with the 30 minutes added, the level or number of questions that can be answered is still seen to be low, namely fewer than 50 questions that can be answered in one sitting of the House. In other words, fewer than ¼ of the questions raised can be answered in this honourable House. This once again shows that there is a need to increase the question-and-answer session time in the honourable House.
Honourable Madam Speaker, to improve the quality of debate in this honourable House, more time or flexibility in time should be given to the Honourable Members when we take part in debates. Do not trouble to borrow from other Honourable Members.
No, all the Members just now said you were only given 20 minutes.
Peruntukan…
So I allow two more minutes.
The allocation of 20 minutes is sometimes not enough for Honourable Members who need to voice their views in this honourable House, moreover the total number of sitting days of the State Assembly does not exceed 20 days and each Honourable Member has only two opportunities to take part in the debate. Is this time of about 40 minutes a year enough to raise the problems of the people or to voice the views of the Honourable Members? Is such a situation fair to the taxpayers or the people who chose us as their representatives in this honourable House? Therefore, Skudai proposes that each Honourable Member be allocated at least 30 minutes when taking part in the debate, and if necessary, the sitting days be increased so that our debates can be of higher quality and more problems and more issues can be discussed in this honourable House. In addition, the State Assembly also needs to make use of the debate at the Committee of the Bill stage in the process of enacting state legislation.
Debate at committee stage will allow a Bill to be scrutinised and the quality of debate can be improved to the point of phase by phase. The management of the State Assembly also needs to speed up the implementation of live broadcasting during the sittings of the House in real time. The live broadcasting of the House sittings can be carried out online through the official government website or existing social media platforms. If there are considerations or factors that cause live real-time broadcasting to be unable to be implemented in the near future, then it is proposed that recordings of the State Assembly sittings be uploaded to the website after the sittings, so that even though not in real time, at least the public can still follow the State Assembly sittings and can assess for themselves the performance of the Representatives chosen by them in this honourable House. To overcome...
So time is up.
There is a bit more. Honourable Speaker, if...
Alright, how much longer? One minute?
If possible, three more minutes.
One more minute.
Ha, ok. Honourable Madam Speaker, to face the new political scenario in this state of Johor, we must practise an open attitude in resolving the people's problems regardless of background or differences in political ideology. We should always seek solutions in an inclusive and comprehensive manner by involving all parties in efforts to develop the local community and stimulate economic growth in the state of Johor. Therefore, Skudai recommends that several Select Committees on several important issues that are the focus of the people be established so that these issues are given due attention and effective solutions are sought to resolve those problems. The membership of these Select Committees is proposed to cover Members of the House from the ruling party, Members from the opposition parties, and also suitable NGO representatives. Skudai is confident that with the establishment of these Select Committees, we can create cooperation among all the parties involved so that each sets aside differences in political ideology and sits at the same table to discuss the issues that arise and also seek the best way forward in the interest of the people.
With the involvement of non-government membership, Skudai is confident that more comprehensive policies and proposals that meet the interests of all parties can be found as a result of discussions in this Select Committee. Among the committees proposed are the Select Committee on Water Management and Environment, the Select Committee on Public Transport, the Select Committee on Government-Linked Companies and Statutory Bodies, the Select Committee on Local Authorities, the Select Committee on Combating Crime, the Select Committee on Singapore - Johor Traffic, and the Select Committee on Land and Natural Resources. Skudai is confident that the establishment of these committees can improve administration and further strengthen the position of the Pakatan Harapan government.
Ok.
Thank you for the opportunity and the extra time granted by the Honourable Madam Speaker. Once again Skudai reminds all the Honourable Members in this House, especially those who are now seated on the opposition side, that we should together pool our energies, sit at the same table together, and discuss issues and policies in the interest of all the people regardless of political ideology. That is all, thank you.
The Honourable Bukit Naning is invited.
Assalamualaikum warahmatullahi wabarakatuh. Greetings of peace and good afternoon. Thank you, Honourable Madam Speaker, for giving Bukit Naning the opportunity to take part in the Debate on the Motion of Gratitude for the Royal Address of His Royal Highness the Sultan of Johor on the Official Opening of the Second Session of the 14th Johor State Legislative Assembly on 27 June 2019 that has just passed. Don't worry, Madam Speaker, Bukit Naning will not continue the story about urination. Insya-Allah, Bukit Naning will continue to practise the politics of responsible values, working for the people.
Honourable Madam Speaker, first, allow me to extend Selamat Hari Raya Aidilfitri, Maaf Zahir Batin, because we are still in the blessed month, namely the month of Syawal. What does Syawal mean as khalifah on this earth? Our presence in the month of Syawal also moves the heart for us all to take lessons from several great events recorded in the Sirah of Prophet Muhammad SAW, among them the Battle of Uhud, which took place in the middle of the month of Syawal in the third year of the Hijrah; the Battle of Ahzab, meaning the war against the allied disbelieving armies, also known by the name the Battle of Khandak, meaning the trench dug by the Muslim soldiers as a fortification in holding back the advance of the enemy, which took place in the month of Syawal and continued until the beginning of the month of Zulkaedah in the fifth year of the Hijrah; and the Battle of Hunain, a battle that took place in the month of Syawal in the eighth year of the Hijrah after the opening of Mecca. When facing the enemies of Islam, the Muslim army received different results, between victory and defeat.
For example, the Muslim army was granted victory in the Battle of Badr in the month of Ramadan even though their numbers were very small, but because their souls were pure and their hearts were clean in submitting and devoting themselves to Allah alone, they were bestowed with strength and victory. No material gain was sought and no worldly influence was the goal and purpose in their struggle. On the other hand, in the Battle of Uhud, only a small number of the Islamic congregation did not follow the orders of Rasulullah SAW. They were taught through the spurting of blood that dripped from the bodies of the Muslims, so much so that the teeth of Rasulullah SAW himself were broken and his cheek bled. Therefore, because some of them left the hill to chase the spoils of war and material wealth, they were taught by Allah through the martyrs who lay strewn about. And how they were tested again collectively in the Battle of Hunain, when they were proud of their large numbers, they felt that they could not possibly be defeated, until they were tested with defeat at the early stage by an ambush from the enemy.
This event is a strong proof to show that the success and victory of the Muslim ummah, the glory of the Islamic generation, is not the making of man but is a gift from Allah. The help and gift from Allah will not come for free, although Islam is a religion revealed by Allah, as the expression of a scholar says, even though Allah could grant victory to Islam like the falling of rain from the sky. But because Islam is revealed to mankind, the success and glory of Islam must proceed through the very process of humanity, through the human qualities that exist in man, shaped through the way of human life and through the pressure of oppression faced by them.
Therefore, Allah trains and shapes them through revelation, individually and collectively, presenting before them a thousand real and practical tribulations. The touch of revelation that refines the attitude and spirit to bear the trust of Islam until there emerge individuals within the network of one solid and strong congregation. The emergence of an Islamic congregation that can carry out the commands of Allah without condition, a congregation that never deviated even at the moment of the passing of Rasulullah SAW, they could not possibly be shaken, just as they could not be shaken in the time of Rasullullah SAW as khalifah, that is, the leader of society, the sincerity of heart and administration... administration is needed to guarantee the welfare of the ummah, regardless of whether they are Muslim or non-Muslim, as in the word of Allah: "Verily, Allah will not change the condition of a people until they change what is in themselves."
Honourable Madam Speaker, the state government, through various initiatives, has provided the best services to the people of Johor, for example through the Kad Sihat Johor. This Kad Sihat is to enable low-income people to reduce their healthcare costs. I extend congratulations to the Most Honourable Menteri Besar of Johor, Dato' Dr. Sahruddin bin Jamal, who implemented this programme when he was the Health EXCO previously. This programme needs to be enhanced in value by allocating funds for the increase of quotas and the expansion of panel clinics to ease access for the community, especially in rural areas. Indeed, it is from health that the civilisation of the community itself grows. Two important things in society are, first, education, and second, health.
Honourable Madam Speaker, in the royal address of His Royal Highness the Sultan of Johor, namely to ensure that the financial governance of the state of Johor is administered well so that wastefulness does not occur, yet at the same time much development has still been delayed. What is chased cannot be obtained, and what is carried gets scattered. I would like to share in this noble House that we should take the story of Nabi Yusuf A.S., which is elaborated at length in the surah Yusuf. It recounts how Prophet Yusuf, who was persecuted in various ways from childhood to adulthood, but through patience and guidance from Allah SWT, was eventually appointed as a wazir in the administration of the Egyptian government. Such is the decree of Allah, no one can change it. It is a classic example of how a believer faces and deals with persecution and slander. Read this surah and understand its meaning, which is relevant for us to practise throughout the ages.
The story that relates to Prophet Yusuf in terms of economic management begins with the event when he was asked to interpret the dream of the King of Egypt. It began with the King of Egypt, one night, dreaming that he saw seven fat cows being eaten by seven thin cows, and seven green ears of grain, and seven others that were dry. He then gathered the chiefs of the tribes in the land of Egypt to inform them of his dream and very much wished to hear what meaning was contained behind his dream. And the King of Egypt said, "Indeed, I dreamt that I saw seven fat cows being eaten by seven thin cows, and I saw seven green ears of grain and seven others that were dry. O chiefs present, explain to me the meaning of my dream if you are people who are skilled in interpreting dreams." In short, after no one was able to interpret the King of Egypt's dream, a palace servant who had once been a prisoner together with Prophet Yusuf A.S. some time ago, and who recalled the greatness of Prophet Yusuf in interpreting dreams, informed the King of Egypt of the news about Prophet Yusuf's greatness. After the King of Egypt's dream was referred to him, Prophet Yusuf not only was able to interpret the dream accurately, but he also gave correct advice to the king in facing the economic problems faced by the King of Egypt at that time. Prophet Yusuf, in his advice, said, "You should sow for seven years as usual, then whatever you harvest, leave it in its stalks except for a little of the portion that you use for eating. Then after that there will come seven years of great drought which will consume what you have prepared for them, except for a little of what you have stored to be used as seed. Then after that there will come a year in which people will receive the blessing of rain and in which they will press out the produce."
The next approach practised and adopted by Prophet Yusuf, which had never been practised by anyone before, is the strategy of making long-term savings from the nation's produce, on the basis of being mindful to save in times of ease before it is spent later when there is need. For this reason, Prophet Yusuf reminded that when the harvest season comes, do not consume all the harvest that is to be used as food in a short time; rather, some must be preserved in its freshness to be used over the long term, besides being kept as seed for the next planting season. This is what is meant in the Royal Address of His Royal Highness the Sultan of Johor, Sultan Ibrahim Ibni Almarhum Sultan Iskandar, in the context of managing the state government's finances.
Honourable Madam Speaker, in Bukit Naning there is the only and largest well-preserved peat swamp forest in Johor. Its location is in Mukim Ayer Hitam, the Ayer Hitam Utara Forest Reserve, namely HSAHU, located in Mukim Ayer Hitam, Muar District, with an area of 3,795.84 hectares and 22 compartments, namely compartments 1 to 22. It is a Permanent Forest Reserve and was gazetted on 28.2.1940 with gazette number 24272, and under the Annual Felling Treatment Plan, RTRT, it is classified as a flood control forest and is the only peat swamp forest in the state of Johor. Under the decision of the State Executive Council of Johor on 25.6.2008, Summary of Meeting Number 1238/2008, it agreed that the area of 3,795.84 hectares in Ayer Hitam Utara Forest be developed as the Peat Swamp Forest National Park. The Peat Swamp Forest National Park is managed and classified as a protection forest. Forest produce activities, namely logging, are not permitted at all. This Peat Swamp Forest National Park is also used for eco-tourism. The strategy of using existing natural resources for the benefit of the community of the Bukit Naning State Constituency (DUN Bukit Naning) and Muar District is through two things, namely conservation and use.
The first, conservation: ensuring that the Ayer Hitam Utara Forest Reserve is not threatened, especially by destruction from fires that frequently occur during the hot and dry season, as happened in 2008, 2014 and most recently in 2019. Among the matters that need emphasis is the enforcement of the prohibition of open burning activities in areas near the Ayer Hitam Utara Forest Reserve. The second is a programme of supplying water content to the peat soil parts of the forest to prevent water from flowing out, thereby increasing biodiversity, such as the construction of check dams.
The second, use: providing suitable infrastructure facilities and promoting sustainable programmes that can generate opportunities for local residents to be involved in eco-education tourism programme activities. Building a wakaf and other ancillary facilities at the forest entrance road, namely in compartment 12, to facilitate the activities carried out. Providing special funds to local communities for the care of the Ayer Hitam Utara Forest Reserve, such as the Community Fire Brigade and the Community Tourism Management NGO in the peat soil areas. It requires a large cost to ensure the conservation of the peat soil, because this is the only and largest peat swamp forest in the state of Johor.
Honourable Mr Speaker, the welfare of rural residents is a major priority of Bukit Naning in governance. In Bukit Naning, problems such as drainage that is not properly managed exist due to a lack of allocation. This will become worse once the monsoon season arrives. A better system needs to be established to manage the drains in Muar District in particular, since previously only RM4 million was allocated for a single servicing of drains across the whole of Muar. Therefore, Bukit Naning hopes that the government can provide an allocation of RM20 million, per year, for the maintenance of drains across the whole of Muar District, so that the flood problem in most places in Muar District can be resolved.
Honourable Madam Speaker, in line with the Muar City Special Area Plan, Royal Town, and the continued recognition of Muar as an Asia Clean Tourism City, an idea of a programme called the Clean and Prosperous Heritage City (BWBS) has been formed, which is a manifestation to place the importance of heritage, cleanliness and well-being in the development...
The pre-launch ceremony of the Clean and Prosperous Heritage City Programme (BWBS) was officiated by Honourable Puan Yeo Bee Yin, Minister of Energy, Science, Technology, Environment and Climate Change, on 19 September 2018 in conjunction with the World Cleanup Day programme, the core of the Clean and Prosperous Heritage City (BWBS) under the Muar Municipal Council.
i. Urban rejuvenation and heritage conservation. ii. Transformation of hawkers in the city. iii. Environmental sustainability. iv. Great forward solid waste management.
Flogging Muar was first introduced on 31 March 2018. It was part of a cleanliness campaign series with the theme Environmental Ethic Society. The programme was held in a relaxed manner at the recreational areas of Tanjung Mas and Tanjung Ketapang and was officiated by the Yang Dipertua of Muar Municipal Council. The flogging activity has been adapted with a distinct identity of Muar District, where it is carried out not only through jogging but is also practised in other recreational activities. This agenda is one of the efforts to sustain the aspect of cleanliness and to cultivate the practice of keeping the surroundings clean together with the community.
For the information of this honourable House, Muar was also selected together with Kampung Baru Kuala Lumpur, Tawau, Sibu and Pulau Pinang as one of the studies for the project to prepare a Climate Change Action Plan by The Global Covenant of Mayors for Climate and Energy (GICOM). This climate change adaptation action plan will be used as a guide to make Muar District a sustainable and low-carbon city in the future.
Sila gulung.
This plan will be prepared by a team of experts from UTM and the Low Carbon Asia Research Centre, and will be fully funded by GICOM. Muar Municipal Council (MPM) has strengthened the SPAS Programme, where all building plans starting 1.1.2019 require SPAS to be placed attractively at the front of the house. This is an improvement on the earlier initiative, which placed SPAS bins at the back of houses where space was not fully used, resulting in the bins being opened after CCC inspections by the Local Authority (PBT).
In addition, MPM also requires all developers to carry out CSR by building a permanent rubbish porch at the front of houses. And, coordinated through the approval of the landscape plan, this rubbish porch is equipped with a landscape area for edible plants in the upper area and a 5R+2C rubbish bin area, namely replace, retreat, reduce, reuse plus compost, close, in the lower area for the segregation of recyclable waste. This can support recycling programmes. At the same time, it reduces the burden on the increasingly limited landfill sites and encourages urban farming activities among residents. This proposal is hoped to be widely disseminated to all PBTs to support green neighbourhood activities and environmental sustainability.
Honourable Member, Madam Speaker, the existing rubbish disposal site on Lot PTD 4007, Jalan Kebun Sayur, Mukim Jalan Bakri, has a site area of 36 acres. The safe closure process for the site began in 2008 and was supposed to be completed in 2010. However, until now 20% of it is still being used as an active cell for the landfill, since there is no new site for that purpose. The existing landfill site in Bakri has passed its period of use and needs to be safely closed. Frequent fires at the landfill site show the release of methane gas and leachate that are not properly managed, safety risks to workers, the community and surrounding areas, and air pollution. To overcome this problem, it is proposed that part of the open space reserve at the Timber Industrial Park, namely Muar Furniture Park in Bakri, be used for a transfer station, and that the compensation revenue for the use of this site by JPSPN (Jabatan Pengurusan Sisa Pepejal Negara, National Solid Waste Management Department) be used to fund the proposed construction of the new Terminal Maharani Sentral on Jalan Pintasan Muar to reduce congestion in the city centre.
Bukit Naning, your time is up.
For information, for a long time Muar has faced the problem of furniture industries operating without Planning Permission (KM) approval. Among the factors contributing to this problem is that operators only rent the land and are not its owners. There is a need for furniture management to be implemented to meet demand from investors. The KM and SPKS processes involve changes to land conditions, which take time. Therefore, operators and landowners are willing to take the risk of breaking the law and carrying out development and operating factories without approval of development plans. Accordingly, MPM has implemented limited Planning Permission for the purpose of regularisation, and the KM approval process can be expedited, while at the same time the SPKS process must be completed by the landlord. This is to prevent PBTs from losing revenue. So, as time has run out, I request that all the problems raised be treated as a matter concerning the general public. This community is the backbone of society. It should be a priority in this honourable House to examine all these problems from various angles. So, Bukit Naning hereby supports and humbly thanks His Royal Highness the Sultan of Johor for the Royal Address at the Official Opening of the Second Meeting of the Fourteenth Johor State Legislative Assembly. That is all, thank you.
Honourable Members, I suspend this sitting until 3.55 p.m. this afternoon.
The sitting was suspended at 3.25 p.m.
The sitting resumed at 3.55 p.m.
Assalamualaikum warahmatullahi wabarakatuh. The debate is resumed.
Debate on Rundingan under Standing Order No. 29.
The time given to the mover and three debaters, if any, is 10 minutes each, after which the government will reply. Honourable Permas, please proceed.
Thank you, Honourable Member, Mr Speaker. Permas wishes to bring a Rundingan on the issue that occurred in Pasir Gudang on 7 March 2019 and 20 June 2019 into this honourable House. Honourable Member, Mr Speaker, according to information received, there are 2,500 factories in the Pasir Gudang industrial area, and 250 of them operate with chemicals. Hence, Permas would like to propose that the government review the level of safety of residents in the Pasir Gudang area.
Honourable Member, Mr Speaker, in a report Permas received earlier, the incident that occurred at Sungai Kim Kim has caused trauma to the residents of Pasir Gudang, because the event that happened just 6 months, 3 months and 13 days ago now recurs with the same impact on the Pasir Gudang residents. Permas proposes this motion to be debated regarding how the monitoring of air quality levels has been carried out by the Department of Environment (DOE) up until these cases occurred repeatedly.
Honourable Member, Mr Speaker, Permas has obtained information that there are factories that have become targets for the dumping of chemicals from ships carrying such waste into this state, particularly in Pasir Gudang. Hence, the Department of Environment is urged to carry out frequent monitoring without compromise on these factories in order to curb the problem from recurring. In addition, the Department of Environment must also be responsible for providing the monitoring schedule that has been carried out from the date of the Sungai Kim Kim incident until the date of the recent second incident in Pasir Gudang.
Honourable Member, Mr Speaker, Permas proposes that this matter must be taken seriously by the government so that the safety and health level of residents in Pasir Gudang is ensured. Permas is informed that the federal government, in particular, has been taking a lukewarm attitude towards enforcement against the factory industries in Pasir Gudang. So, the previous government, before this, after, so the previous government before this was seen as simply passing the buck, sacrificing the lives and safety of residents in Pasir Gudang. Permas proposes once again that this matter be reviewed by establishing a buffer zone, with permission, between residents and industry, Honourable Member, Mr Speaker. Permas also proposes that high-technology equipment be installed to detect air quality levels at every factory, the cost of which will be borne by industry through a pollution payment scheme proposed by the government. Hence, Permas also humbly requests that this honourable House support Permas so that the intention to incorporate the Johor State Environment (Alam Sekitar Negeri Johor) is realised, so that pollution incidents in Pasir Gudang will not recur a third time, insya-Allah. This effort must be consistent, and enforcement must be improved to resolve the matters arising.
Honourable Member, Mr Speaker, with this, Permas proposes that this Rundingan be supported. Thank you.
I open the debate. Semarang.
Assalamualaikum warahmatullahi wabarakatuh. Thank you, Honourable Member, Mr Speaker.
Permas off, off. Ok, please, Semarang.
The mic is on here. Honourable Member, Mr Speaker, we are faced with a matter of great seriousness. Once, when MH17 went missing, everyone was in an uproar. Everyone blamed the authorities. Now, what is before us is a phenomenon with major implications. We must know what the implications are. The image of the state as a developed state has been stained with black ink that is truly shameful. However, we must accept this as destiny, but we must strive to address it so that it does not happen, and we must identify thoroughly the causes and reasons. Coincidentally, 3 months ago, 13 days, as stated by Permas earlier, it happened, and now it has happened again. And this is the third wave, with permission. Previously it involved more than 4,000 people, which was already enough to cause an uproar.
Statements after statements were issued by the authorities, individually and in groups; statements were even made in groups. But it happened again. The question is, I want to know how the government knew to focus on the 30 companies operating chemical-based industries in Pasir Gudang? What about the monitoring and the findings that have been made? This time, it raises even more questions, especially as it affected the people of Pasir Gudang involving schoolchildren in more than 100 schools in the Pasir Gudang area. It must be remembered that Pasir Gudang is an industrial town, and it involves the PBT or the specific Local Authority that is responsible for the administration and also the location of the industries in this town. And at the same time we have been informed, we want to know how these chemical companies, the halal and haram ones, meaning those with permits and without permits, legal and illegal industries, are. Actually, how many are there? I want to emphasise here, do not let us be without data. Start with the Local Authority, there must be. What type of industry it is, mapping where it is located. Do not let us, if we want to grope in the dark, end up having to hire ghost busters to solve this problem. Now it is stated that there is a strange gas. Permas just mentioned the gases. At the very least, Permas is excellent. He knows about the gas and how it can reach the public.
So, now we want to know to what extent the monitoring of registered and unregistered industries in Pasir Gudang is being carried out. In other words, we must have complete data on the industries concerned. At the same time, we also need to monitor and know among the more than 250 companies involved. To what extent can we know whether they dispose of their waste, toxic waste, with permission, at the centres that have been provided? Those in Negeri Sembilan such as Kualiti Awam, Waste Management Centre, to what extent, and at the same time we must not overlook private contractors. Whether registered or not registered. Whether monitored or not monitored. Whether they send it to the designated disposal centres or take the easy route, the short cut, by dumping the excess or the waste in various places and causing high risks to the local community.
Therefore, I also want to emphasise that the government can no longer claim that it did not know about this matter, it cannot. The people down below, in Pasir Gudang, in the state of Johor and throughout Malaysia, cannot say they did not know. If you did not know, you cannot say so. It must be pursued, and we are confident, we give trust, and we are confident we also suggest that a special, with permission, task force, the Special Inter-Department Task Force, be established, involving the DOE, DOSH, the Fire and Rescue Department (Bomba) and the Police, and the Local Authorities, because the reality in our country, including in our state, is that the problem is coordination between the departments in our state. Coordination must be improved so that information is shared, not each moving on its own. Moreover, if we talk about Sungai Kim Kim, we must also involve BAKAJ (Badan Kawal Selia Air Johor, Johor Water Regulatory Body). We talk about water; now we are moving towards determining indoor air quality, but we are faced with external air quality that is very bad in our state.
Honourable Member, Mr Speaker, we also want the DOE or the Department of Environment to be transparent and update the website more frequently so that the people of Pasir Gudang are always informed about daily air quality. Whether water and air, and not just air, water, what its condition is, so that they know the situation. We are saddened when we see government departments working in full protective clothing, but our reporters only wear very thin masks, a stark contrast. This is a matter that tarnishes the image of the state of Johor, and we hope it will be addressed better, and I am confident that with strong political will, with the sincere efforts of all parties, this matter can be addressed. I hope it will not happen again, because once may be by coincidence, but if it happens two or three times, we feel that something is not right, and I am confident this matter will be easier to address if we have complete data obtained by the relevant departments on behalf of the government. That is all, thank you, Honourable Member, Mr Speaker.
Honourable Member Perling, please.
Thank you, Honourable Member, Mr Speaker. Perling supports the Rundingan brought by Permas and would like to make additional proposals to this honourable House. So, Honourable Member, Mr Speaker, earlier we knew that there was RM6.4 million from the federal government for the Sungai Kim Kim incident. So, perhaps I feel we need more for public explanation of what we are doing, because we understand our friends, our State Executive Councillors (EXCO), our State Assemblymen (ADUN) over there, have also toiled hard to find a way to resolve, at least to find a way to resolve this problem. But what we see is that, at times, all of social media has made many speculations. So I feel we need a report, especially the post mortem report on Sungai Kim Kim, the Sungai Kim Kim incident 3 months ago, to be made public, because with this I feel that at least we can make the public understand what the difference is between the previous Sungai Kim Kim incident and the incident that has just recently occurred. So, Perling also wishes to state that the effects of the incident that occurred in Pasir Gudang were mostly on students, who, as we know, are children and still weak. So Perling found that there are still chemical residues that exist and are stored near factory areas, particularly those related to chemicals. So Perling requests that the government ensure these chemicals are disposed of immediately.
Honourable Member, Mr Speaker, we should make use of the latest technology to improve the effectiveness of the environmental quality monitoring system. So, the government must make it mandatory for high-risk industries to install environmental quality monitoring devices so that 24-hour monitoring can be carried out online and in real time. Now that this technology exists, real time, we know what the rate is and the data on the release of pollutants into the air and sewage into rivers can be collected and monitored from time to time into the government database for more effective monitoring. So, through big data analysis we can predict and prevent problems that may occur. This is the technology of this era that we call, with permission, the Internet of Things, real time, so we know if there is even a small problem, we can take action immediately. So, at the same time the government needs to provide sufficient space to enable public involvement in the environmental quality monitoring process. The public should be allowed to give feedback to the government on any pollution issues observed at any time, especially outside office hours, which are often when serious pollution occurs.
Next, Honourable Member, Mr Speaker, a response team that is always ready 24 hours a day must be established so that any complaints and feedback from the public can be responded to as quickly as possible once the complaint is received, to deal with any pollution threat that may occur in a short time. And also, Honourable Member, Mr Speaker, we must also consider whether we, I feel we need to tighten the laws relating to the release of gases or pollutants, especially if we can look at heavier penalties for those convicted of such offences, and we see whether, for the time being, it may be possible to consider installing air-conditioners, with permission, or air-conditioning units in classrooms on the second floor and above in the Pasir Gudang area, to reduce the risk of us facing pollution in the Pasir Gudang area. With this, Perling supports the Rundingan brought by Permas. Thank you.
Jemput, Benut.
Thank you, Honourable Mr Speaker. This evening we are together listening to a motion which, from the beginning, I have already said is rather strange, but I respect the decision of Mr Speaker, a motion put forward by a government representative which finds that the government has failed. Alright. We are all aware that, based on the arguments put forward by the mover of the motion regarding the concerns and the demand for the government to take appropriate measures, we as the opposition on this side add to what has been said, that it is not appropriate for a minister to say that this strange gas exists, namely
methyl mercaptan, which has a high effect and risk for children and also for asthma patients. That is one of the many findings.
So, Honourable Mr Speaker, I will support this motion but with a condition. My condition is that the Most Honourable Member must go to the ground immediately to give assurance to the residents of Pasir Gudang that the situation is under control. Measures have been taken by the government. The government is capable of resolving the existing problem. If possible, the Most Honourable Member should go down, but not like the one time when a minister went down at the first incident with his mask, wearing bulletproof clothing, no need. I believe the Most Honourable Member is a very responsible leader; the Most Honourable Member knows what must be done by the head of government. So, my condition for supporting this motion is for the Most Honourable Member to go to the ground, if possible tomorrow, or as soon as possible. Because the big problem being faced now is the confidence of the community in Pasir Gudang, that action is being taken by the government. Because various parties, as was said earlier, have even politicised the situation that occurred in Pasir Gudang. Only the Most Honourable Member can calm the residents there, and only the Most Honourable Member can give a warning to those who are responsible for the air pollution incident that has occurred.
I am confident that, with the assurance the Most Honourable Member can give to the residents of Pasir Gudang, this problem will be resolved. The public's confidence, whether because of the strange gas, or because we do not have a buffer zone, or as the Honourable Member for Permas said earlier, because we need to look for a mechanism, the Most Honourable Member should consider this: there are 2,005 licensed factories in Pasir Gudang. 250 of those factories are chemical-based. So the intensity of this cannot be denied. The concern will exist among the community in Pasir Gudang. Therefore, an authority figure, a statement made by the authorities. The Most Honourable Member, as the leader, I believe that with the assurance the Most Honourable Member can give to the community in Pasir Gudang, it will be able to erode and dispel all concerns, including among the Honourable Members concerned. So, Honourable Mr Speaker, I hope this conditional support will receive the attention of the government, thank you.
The condition is not too heavy.
Not heavy. The Honourable Member just go down, the Most Honourable Member go down.
Most Honourable Member, to answer several questions. Please.
Thank you, Honourable Mr Speaker. Assalammualaikum warahmatullahi wabarakatuh. Thank you, Honourable Speaker, and Honourable Members who are very concerned about the situation that occurred in Pasir Gudang. I would like to thank the Honourable Member for Permas for the urgent motion he moved, which shows our concern as the government, which is better compared with the side over there. The side over there considers us to have failed. That is their view. But for us, that is our concern. (House applauds). It turns out that the opposition has provided two generals to debate the motion proposed by the Honourable Member for Permas. Perhaps the side over there has less exposure to watching or listening to the news. For instance, during the first case at Sungai Kim Kim, the first EXCO to go down immediately on the first day, as soon as the House adjourned, was the EXCO for Health, Agriculture and Environment, yes. However, for the information of our friends on the other side…
Did the opposition go down at that time, Most Honourable Member? Alhamdulillah…
However, that EXCO portfolio, all three of them, are no longer there. So, I think the opposition needs to check the memo again; if they want to send a memo, make sure the memo is accurate and correct. And after I returned from Umrah, I went straight to Pasir Gudang. That is why I said the side over there has less exposure to TV or less exposure to the news, yes.
I would like to thank the Honourable Speaker for agreeing to allow the debate of Honourable Members on the issue of pollution that occurred in Pasir Gudang. On 13 March 2019 just now, we were shocked by the pollution case in Sungai Kim Kim, Pasir Gudang, which resulted in 9 victims being treated in the Intensive Care Unit (ICU), and more than 166 were admitted to Hospital Sultan Ismail. For everyone's information, Sungai Kim Kim has been polluted for more than 10 years, yet no action at all was taken by the previous government. The federal and state governments, with the cooperation of technical agencies, have done their utmost to tackle the pollution issue of Sungai Kim Kim. And I extend my highest thanks to all the agencies that have helped the government to resolve the Sungai Kim Kim issue.
Among the measures the government has taken are the following:
First, the state government approved an immediate emergency allocation of RM6.4 million as urgent assistance to carry out cleaning work for the chemical pollution in Sungai Kim Kim, covering 1.5 kilometres, over 4 days.
Second, the federal government, through the Ministry of Energy, Science, Technology, Environment and Climate Change (MESTECC), established a Technical and Scientific Monitoring Management Committee to monitor the situation in Pasir Gudang on a regular basis. The Johor Department of Environment (JAS) carried out investigations, and a company is being prosecuted under Section 34 (b) of the Environmental Quality Act 1974, for being suspected of being directly involved in discharge into Sungai Kim Kim. The trial date set by the Johor Bahru court is 11 July 2019. In fact, whatever proposals were put forward by the side over there have all been implemented. Latest, on 20 June 2019, we were once again shocked by the incident of breathing difficulties and vomiting at Sekolah Agama Taman Mawar, Pasir Gudang. Acting on the report, the Fire and Rescue Department of Malaysia, the Health Department, the Civil Defence Force, and various agencies rushed to the scene to investigate the cause of the incident and to provide initial assistance to the students. Not only the agencies went down; I also saw several EXCOs and YBs also quickly went to the affected area. The immediate action taken by the state government was to simultaneously activate the Coordinating Committee for Assistance and Disaster Management at district and state levels to coordinate the management of the pollution and assistance. The Technical and Scientific Monitoring Management Committee meeting was also held every day to ensure that each agency involved made its best effort to find the source of the pollution.
The Johor state government, together with technical agencies, has taken the following actions:
First, holding the Coordinating Committee on Monitoring and Scientific Meetings to monitor air quality, covering a 15-kilometre radius to identify the source of air pollution.
Second, conducting integrated operations with the Department of Occupational Safety and Health (JKKP) and the Pasir Gudang Municipal Council (MPPG) to ensure that the 250 other premises identified as handling hazardous materials comply with the SOPs set by the government.
Third, carrying out tracking and investigation of 72 industrial premises for offences under the Environmental Quality Act 1974.
The results are as follows:
i. Offences relating to scheduled waste, 40 compounds; ii. Offences relating to industrial effluent, 10 compounds; iii. Number of directive notices, 3 notices; iv. Operation suspension orders, 3 industrial premises.
The Coordinating Committee on Monitoring and Scientific Meetings reported that the cause of the incident of breathing difficulties and vomiting was pollution from Methyl Mercaptan, Acrolein and Acrylonitrile gases. The presence of these gases is an anomaly, that is, an abnormal condition where the presence of Methyl Mercaptan gas can be detected in ambient air. Due to the saturated development environment in Pasir Gudang, any anomaly like this will affect high-risk groups such as children and people with asthma.
Therefore, JAS has issued a directive notice to 5E Resources Sdn. Bhd to dispose of all scheduled waste (residue), on 24 June 2019. Disposal work began immediately and a total of 60 tonnes of waste was disposed of on 25 June 2019, and the remaining 40 tonnes was disposed of on 26 June 2019. All chemicals containing methyl mercaptan were cleaned up and confirmed to have no further readings on 27 June 2019. MESTECC has taken immediate steps to remove the contributing factors to the presence of these gases and to continue enforcement and monitoring efforts on chemical-based factories around Pasir Gudang.
To avoid the risk of incidents like this happening again, the state government will take several actions, such as:
1. Directing the Office of the Deputy State Secretary of Johor (Development) and the Department of Environment, together with the Coordinating Committee on Monitoring and Scientific Meetings, to draft a long-term plan to make Pasir Gudang a sustainable industrial town. 2. The committee must monitor the environmental conditions in Pasir Gudang and report to the Honourable Chairman of the Local Government and Urban Wellbeing Committee every month. 3. Enforcement activities must be increased and tightened on high-risk chemical factories. 4. The state government also supports the proposal of the Honourable Minister of MESTECC to build automatic gas monitoring stations that can give early warning of chemical disasters more efficiently and quickly. This can help the authorities to act more proactively.
The state government thanks the Coordinating Committee on Technical and Scientific Monitoring, which comprises various government and private agencies, who have worked very hard to contribute their expertise in helping to detect and monitor the gas readings in the Pasir Gudang environment. The state government also takes note of, and thanks, the memorandum submitted by the opposition on 26 June 2019. Together, let us pray that the tragedy that occurred in Pasir Gudang will not happen again. Thank you.
Thank you to the Most Honourable Member. Congratulations. This Discussion, I think, has been completed, and if we follow 29(3) we do not need to make any decision on this Discussion. This means that this Discussion has been accepted, and I myself take this issue seriously, because once it has been raised in the House, if we reject it, then we would have to wait 12 months before we can bring this Discussion up again. Therefore, I accept whoever brings it, even if it is the opposition, we accept it. Even if it is the government that brings it, we also accept it, because we want both sides to be able to debate important issues concerning Pasir Gudang. Honourable Members, this sitting I adjourn until tomorrow, Monday, 1 July 2019, at 9:30 am.
The sitting was adjourned at 4:30 pm.