Johor · 7 July 2019
2nd session, 1st meeting · 188 turns · 23,458 words · official PDF ↗
ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.
Announcement from the Honourable Speaker.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. (Recitation of selawat). Honourable Members all, praise be to Allah, we have arrived at the last day of this Sitting, which will involve the winding-up by the remaining two EXCO members and, God willing, will be concluded by the Right Honourable Menteri Besar.
Oral Questions.Questions
The Honourable Member Bentayan, please.
Honourable Mr Speaker, my question number 1.
Is the performance of each Local Authority (PBT) assessed by the government, and how is it assessed?
Please, Honourable EXCO member.
Thank you, Honourable Mr Speaker. Thank you to the Honourable Member Bentayan for raising that question. For the information of the Honourable Member Bentayan and also Honourable Members, the performance of each Local Authority (PBT) is assessed by the Ministry of Urban Wellbeing, Housing and Local Government (KPKT) through the Local Authority Star Rating System (SPB-PBT). The criteria assessed are in terms of management, core services, customer management, and also community participation and residents' views. After the assessment is made, the marks will be determined through the star rating system, which is divided into five categories, namely from one star to five stars, where five stars is the best performance, and one star means the services of the PBT concerned need further improvement. That is all, thank you.
Yes, Bentayan, supplementary question.
Thank you, Mr Speaker, and thank you for the answer from YB EXCO. My supplementary question is, may I ask YB EXCO to list the performance of every PBT in the state of Johor according to the Local Authority Star Rating System. That is all, thank you.
Please, YB EXCO.
For the information of the Honourable Member Bentayan, the list of recipients of the Local Authority Star Rating System (SPBPBT) in 2018 is as follows. Under the category of five-star PBTs, those included are Majlis Bandaraya Johor Bahru, Majlis Bandaraya Iskandar Puteri, Majlis Perbandaran Pasir Gudang, Majlis Perbandaran Muar, Majlis Perbandaran Batu Pahat, Majlis Perbandaran Kluang, Majlis Perbandaran Segamat, Majlis Daerah Yong Peng, Majlis Daerah Pontian, Majlis Daerah Tangkak and Majlis Daerah Kota Tinggi; where four stars are Majlis Perbandaran Kulai, Majlis Daerah Simpang Renggam, Majlis Daerah Mersing; three stars, Majlis Daerah Labis. That is all, thank you.
The next question, the Honourable Member Penggaram.
Honourable Mr Speaker, question number 2.
What is the next step the State Government will take to ensure that the Mama Friendly Programme, which encourages working mothers to pump breast milk at the workplace, is implemented comprehensively, extending to both government and private companies?
Please, YB EXCO.
Good morning, greetings of peace, Harapan greetings. Thank you, Honourable Mr Speaker. Thank you to Penggaram for the question raised regarding the Mama Friendly Programme. For your information, the Mama Friendly Programme, namely the Mama Friendly Room, is a programme under the initiative of the Johor State Government through the Darul Ta'zim Family Development Foundation (YPKDT), and this programme is included in the 2019 Budget Speech under the Development Budget for the Implementation of Focus Point 141. The objective of this programme is to support the breastfeeding policy by providing breastfeeding rooms, in an effort to encourage all working mothers to breastfeed their children with breast milk only for the first 6 months and to continue breastfeeding until the child is two years old. Besides that, this programme expresses the government's concern for civil servants and also members of the public, and ensures their welfare and comfort in managing their utilities. It also benefits women who are still breastfeeding by allowing them to pump without shame or embarrassment, avoiding negative views, and having a space and a safe storage place for milk.
For the information of this august House, on 26 January 2019, the Mama Friendly Programme was officially launched by the Deputy Prime Minister of Malaysia, namely the Minister of Women, Family and Community Development, in conjunction with the Santuni Rakyat Programme at Plaza Angsana, Johor Bahru. This programme has attracted attention at the national level, and coverage and response from all Johor citizens, heads of government departments, private companies as well as NGOs (Non-Governmental Organisations). Meanwhile, on 16 May 2019, the launching ceremony of the Mama Friendly Room was held and officiated by Her Royal Highness Che Puan Khaleeda binti Bustamam at the Dato' Muhammad Ibrahim Munsyi Building, Kota Iskandar.
The Mama Friendly Programme targets private companies, NGOs and government departments to jointly support and realise the government's aspiration that these facilities will eventually be provided at all places and locations frequented by the public. Accordingly, the next step taken by the Johor State Government through YPKDT is that, until now, 14 MOUs have been signed in realising the Mama Friendly Programme, namely 10 from the PBT side, 3, 4 sorry, 4 private companies including government agencies; these PBTs include Majlis Bandaraya Johor Bahru, Majlis Bandaraya Iskandar Puteri, Majlis Perbandaran Pasir Gudang, Majlis Perbandaran Batu Pahat, Majlis Perbandaran Kluang, Majlis Perbandaran Kota Tinggi, Majlis Perbandaran Segamat, Majlis Daerah Tangkak and the Pengerang Local Authority, Majlis Daerah Pontian.
From the private company or corporate side, these include Infinity Aid, Malaysian Association of Hotels Johor Chapter, Austin Heights Sdn. Bhd., Senai Airports Terminal Service Sdn. Bhd. For the first stage, the government targets 30 private companies, NGOs and government departments to provide Mama Friendly Rooms for the convenience of staff and also members of the public. Besides that, this programme will also be expanded to the school level in the state of Johor. YPDKT has suggested that the Johor State Government make it mandatory for all supermarkets in the state of Johor to provide breastfeeding room facilities for the convenience of visitors and customers, and monitoring will be carried out by the PBT. That is all, thank you.
Ya, Penggaram.
Thank you to YB EXCO. Thank you to the government for making efforts to carry out this programme. Penggaram would like to know, since this programme was implemented starting from January, what is the response from the private sector and the general public towards this Mama Friendly Programme? Thank you.
Please, YB EXCO.
Thank you, Honourable Speaker. For everyone's information, after the launch of the Mama Friendly Room, the launch of the Mama Friendly Programme by the Right Honourable Deputy Prime Minister in January 2019, YPKDT has continued this effort by signing MOUs with 14 parties, namely state government, private and non-governmental organisations, as I mentioned earlier. Apart from the companies that have signed with YPDKT, the state government found that in fact many parties have taken the initiative on their own to set up Mama Friendly Rooms at their own premises and create breastfeeding rooms, since there is indeed a need among working mothers, such as at shopping complexes and corporate offices.
I am pleased to inform this august House that recently, last week, I too officially opened a breastfeeding room at Kolej Universiti Selatan, which set up a Mama Friendly Room to meet the needs of female staff on the campus. After listening to the sharing of experiences by several female lecturers at the event, it became clearer that a special breastfeeding room is really needed so that working mothers can breastfeed or pump breast milk calmly and comfortably without disturbance.
Honourable Mr Speaker, regarding public awareness, the state government also received feedback, with permission, from employers in private companies, especially from men, and found that they actually still do not sufficiently understand the needs of their female staff who are breastfeeding their children. Therefore, male employers have not yet seen the needs of female staff in terms of the needs of breastfeeding mothers. Hence, the state government, through YPDKT, will organise a campaign for men who are employers, fathers or colleagues so that their understanding and awareness of this programme can be increased. And, the state government believes that with this effort we can make men aware, and only then can we empower women. Thank you.
Skudai.
Thank you, Honourable Speaker. Congratulations and well done to the government for implementing this programme, where breastfeeding has become a trend and is increasingly important, and it does cause difficulties if facilities like this are not provided adequately and properly. Honourable Mr Speaker, we find that at present the standards or designs for these facilities are not, we would say, uniform; some are more comfortable, some are complete, some are lacking, some are just a room with one chair. So, does the government intend to make this policy mandatory, or a compulsory policy that must, what's it, be taken into account during the building plan process or in the design process of a premise? If so, what efforts or incentives will be given, or what programmes will be carried out by the government, to ensure that especially the private sector voluntarily complies with this stipulation?
Please, YB EXCO.
Thank you, Honourable Mr Speaker. As the question asked by Skudai, so far, as I mentioned earlier, so far, for the start of this programme, we have just implemented it and just launched it, so far MoUs have been signed, and in those MoUs, we have set basic conditions on what needs to be provided or completed for the Mama Friendly Room. So, for everyone's information, the room is an enclosed room with comfortable seating equipped with electrical plugs, a washing area, a fan or air conditioning, hot water and a refrigerator for them to store breast milk. This is a basic requirement for those providing this room. And so far, we have signed with the PBTs where these matters can be equipped, but it would be good if we could implement it as a policy and incentive for them. However, as a next action, we will hold discussions with the PBTs so that this can be implemented as a policy. That is all, thank you.
The next question, the Honourable Member Stulang, please.
Honourable Member. My question number 3.
What action will the Government take if it is found that there are housing developers who sell Bumiputera lots to non-Bumiputeras before obtaining release approval from the State Government?
Please, YB EXCO.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah, Honourable Mr Speaker and Honourable Members all. Thank you to YB Stulang for the question: what action will the Government take if it is found that there are housing developers who sell Bumiputera lots to non-Bumiputeras before obtaining release approval from the State Government?
Honourable Mr Speaker, actually, for such lots, without release approval from the government, because every Bumiputera lot has an endorsement, with permission, stated in the title that the lot is a Bumiputera lot, including the explanation in the restriction of interest. If the developer tries to commit fraud by submitting a transfer of ownership form, say ownership under the Land and Mines Office (PTG), then the PTG will not process that transfer of ownership because without a letter of approval or release of Bumiputera status from the government. This should not happen, and what is possibly meant is that when a buyer meets the developer and asks about Bumiputera lots, what is usually reported or the feedback we get is that the developer will say the Bumiputera lots have all been sold out.
I would like to remind this august House that in fact the latest information is based on information from the SUKJ Housing Division. It is not from the housing developer, because once Bumiputera lots are reserved after the approval of Bumiputera allocation, matters concerning the sale of these Bumiputera lots fall under the responsibility of the SUKJ Housing Division. Therefore, it would be good to carry out the latest check with the SUKJ Housing Division and not with the housing developer.
Is there an online system, Honourable Member, for checking?
Ya.
Is there an online system for checking?
So far, Honourable Mr Speaker, we do not yet have an online system for this Bumiputera status, but perhaps we can consider it. However, the simplest way is to make a check with the SUKJ Housing Division, either by telephone or by attending the SUKJ Housing Division office directly. That is all, Honourable Mr Speaker.
Jemput Stulang.
So, thank you for the answer given. So, sometimes what happens is that buyers are also sometimes deceived and buy Bumiputera lots. So, can they be allowed to cancel that agreement, the sale and purchase agreement with the developer? And also the other one is, after the Bumiputera lot allocation process is approved, is the housing developer still allowed to make swapping releases for Bumiputera lots? Thank you.
Please, YB EXCO.
Thank you to Stulang for the supplementary question. As I mentioned at the beginning, the PTG should not, if the title is PTG ownership, approve a transaction for a Bumiputera lot without the release approval of the Bumiputera lot from the government.
Secondly, regarding the question of whether exchange by, with permission, swapping, of Bumiputera lots is still allowed after the Bumiputera allocation approval is issued? This case usually happens, Honourable Mr Speaker, when approval at the SBKS level, at the level of land produce, has been obtained by the developer, and then the application process for Bumiputera allocation is carried out, and according to the standard or, what's it, clutch charter, with permission, for housing projects with fewer than 500 units, this allocation can be approved within 14 days. Or, for housing estate developments exceeding 1,000 units, the Bumiputera allocation approval process can take more than one month. However, there are housing developers who are impatient; as soon as they obtain SBKS approval at the land produce level, they are impatient to wait two weeks or one month as mentioned earlier, and they have begun to sell. To the extent that some have signed sale and purchase agreements, and some have even paid 10% deposits and the like.
So, in the improvement of the Bumiputera Land Policy that we tabled in the recent State Executive Council (MMK) meeting dated 27 March 2019, which takes effect on 1 April 2019, if it is found that the developer has sold Bumiputera lots which eventually turn out to include Bumiputera lots, the issue is like this: they make sales on the assumption that the lots they sell before allocation approval will remain as international (non-Bumiputera) lots, but when the approval comes out, suddenly the lots they expected were not included in the category of Bumiputera lots they had sold, are included in the list of Bumiputera lots. And what happens is they will make an application to make swapping, with permission, exchange of those lots with other lots. And, under the circular or the process of the improved new Bumiputera Land Policy, we cannot consider this issue because we have a guideline or criteria in approving Bumiputera lots. There is a calculation method with guidelines that must be followed. Therefore, each lot determined in the Bumiputera allocation approval has its own criteria. That is why, in this new process, the Bumiputera Land Policy that takes effect 1 April, swapping or exchange of Bumiputera lots is not allowed. And if it does occur, then a charge totalling 25% of the price of the Bumiputera lot will be imposed on the developer who sold Bumiputera lots before Bumiputera allocation approval. That is all, Honourable Mr Speaker.
The next one, please, Buloh Kasap.
Question number 4.
Request that the government state the total number of new jobs that have been created and offered by the state government after one year of the Pakatan Harapan state government administration.
Please, YB EXCO.
Peace be upon you, and the mercy and blessings of God. Greetings to Mr Speaker, the Honourable Mr Speaker, and the Honourable Member for Buloh Kasap. In reply to the question asked, which requests the government to state the total number of new jobs that have been created and offered by the state government after one year of the Pakatan Harapan state government's administration.
In response to that question, I would like to explain to the Honourable Member for Buloh Kasap and to this august House that the economic development of the state of Johor has undergone a transformation towards a more progressive and more dynamic direction. This process has led to more positive economic growth, supported by various economic activities that are constantly moving actively. The development of projects such as RAPID Pengerang, Desaru Coast, Iskandar Global Business Service, and the construction of mega shopping complexes, among them Paradigm Mall and Mid Valley South Key, has greatly contributed to the creation of new jobs in the state of Johor. According to data shared by Jobs Malaysia and SMI, the total number of job vacancies as of today stands at 91,046 job opportunities, and of that total, 17,200 have been filled within the period of one year, which, God willing, is based on statistics as well as on the capacity that exists.
As I have answered in the previous question. The latest job opportunities, held yesterday in a programme organised by Jobs Malaysia at UTC Pasir Gudang, involved 41 employers, where job seekers, new job seekers, or those who have not yet found work came forward. The 41 employers opened booths, and on yesterday alone there were 1,831 job opportunities. Those who are qualified are not only registered but are also immediately interviewed, and God willing, they will be offered employment in the near future. That concludes my reply. Thank you.
Benut jemput.
Thank you, Mr Speaker, and thank you to the Honourable EXCO member. There are 91,000 vacancies that need to be filled, and 17,000 have so far been filled. This is a figure that shows quite a considerable gap in filling. So, returning to the matter of the availability of these job offers, on the other side, the efforts of the government or the encouragement from the government to these private parties, whether in the form of programmes, whether in the form of approaches for training schemes, mentoring, or efforts for positions on a contract basis and their diversity. In terms of that aspect, what is the Honourable Member's comment regarding efforts to provide job opportunities?
Jemput.
Thank you to Benut for the question raised, the supplementary question. In the previous reply as well, I had stated about
several programmes organised by agencies under the government. For example, the Up Skilling and Reskilling Programme, where these programmes have been carried out and have targeted no fewer than 200 to 500 per agency. For example, Johor Skill has provided opportunities for students to undergo reskilling and also upskilling, and offered to workers no fewer than 500 places. That is the programme for one agency, Johor Skill.
Meanwhile, for SMI itself, most recently we have made an award to the agencies involved to provide to school leavers or those who have already undergone upskilling. We have also offered a total of 105 persons, with an overall budget of about RM135,000.00, which we launched just last week. So, this explains to us that programmes of this kind we will continue to implement, and we actually have a budget for improvement or value added, with permission, for workers who are ready to be given or who wish to make changes so that they can add value. When one upskills, indirectly their salary will also go up. When one reskills, I am also confident and believe that their income will increase, because they have added knowledge and opportunities are opened to the people.
If we look at the total of 91,000 available, the management division has 137 vacancies, professionals 2,338 vacancies, and technicians and associate professionals have 1,638. So, these are opportunities for those who wish to upskill or reskill among students. Therefore, we are confident that these opportunities, as seen yesterday in the interviews with job seekers, I found that many among the fresh graduates had made efforts to come from far away, from Pontian and from Segamat, even though we opened the booths earlier in Pasir Gudang. So, congratulations and thanks to Jobs Malaysia. Thank you.
Joining us are several groups of visitors. First, there are visitors from village heads, the State Assemblyman for Parit Yaani, 8 persons. Second, there are village heads from the State Assembly seat of Bukit Batu, 10 persons. Third, there are participants of the Johor Edscape Programme from the Dato' Onn Institute of Leadership Integrity and Training (IKLAS) and the Temenggong Ibrahim Teacher Training Institute, 42 persons. Thank you for attending this morning. Next question, please, Larkin.
Thank you, Honourable Mr Speaker. Larkin's question, Question No. 5.
What are the advantages of Johor Special Water (JSW) in taking over the maintenance duties of sewage treatment plants (STP) from local authorities?
The Honourable EXCO member is invited.
Thank you, Honourable Speaker. Thank you to the Honourable Larkin for raising this question.
Honourable Mr Speaker, Johor Special Water (JSW) is a wholly owned company of the Johor state government and is placed under Permodalan Darul Takzim, PDT. The advantages of JSW are as follows:
First, the existing Sewerage Company Business Plan has not been able to benefit the Johor state government, because all income is channelled to an individual company. Since JSW is a wholly owned company of the Johor state government, this company will become one that can give 100% benefit to the Johor state government.
Honourable Mr Speaker, JSW has appointed several key personnel with more than 30 years of experience in the sewerage and recycled water treatment industry. JSW has also identified several key personnel who are skilled in the operation and maintenance of sewerage systems and who are ready to join JSW whenever needed. Besides that, JSW is a company that has been involved in supplying raw water to the Tanjong Langsat industrial area as early as 2011. Now, JSW is also in the final stage of preparation to supply water to investors for industrial use in the area, several industrial areas in Kulai, through a process of standardisation or declination. At the same time, JSW has also reached an agreement to supply industrial water to investors in the Pengerang Integrated Petroleum Complex (PIPC) area. Therefore, JSW has expertise that can be used to supply treated sewage water as an alternative for industrial customers, which indirectly can increase their storage water supply.
Honourable Mr Speaker, JSW can also actually open job opportunities, targeted at an initial estimate of 80 persons, or children of the Johor people, who will benefit from JSW's operations, and it can also provide more business opportunities to contractors in the state of Johor. JSW has also worked with several experienced consultants in the sewerage industry to help JSW provide training and skills according to the latest standards practised in developed countries in the water industry.
Honourable Mr Speaker, for the information of this august House, JSW's focus is only on the sewerage industry in the Johor area, mainly in MBJB and MPPG, for the time being. Therefore, all development efforts are focused on the state of Johor, which is different from the existing sewerage operators, who have to divide their efforts among several states. After almost 25 years, the existing sewerage company has never brought any development and capital programmes related to sewerage, such as toxic waste treatment facilities, sewage treatment plants, modern centralised STPs and so on, to the state of Johor carefully. This is far different from the development carried out in other states such as Melaka, Negeri Sembilan, Penang, Selangor and so on. Finally, JSW has appointed a contractor or consulting expert who has completed due diligence (due-D) work for the purpose of rehabilitating or operating the STP. Therefore, JSW has knowledge of the current condition of the STP to be taken over, so that repair and correction efforts can be designed and subsequently implemented more effectively. That concludes my reply. Thank you.
Ya, Larkin.
Thank you, Honourable Mr Speaker and Honourable EXCO member. We are aware that until now, JSW still has not succeeded in obtaining a licence, a sewage plant maintenance licence, which the ministry has still not approved. My question is, what about the agreement that has been concluded with the City Council, under which JSW was supposed to take over the maintenance duties of the plant on 1 July 2019, and if the licence cannot be obtained from the ministry, is this matter still being borne by the City Council? Thank you.
Please, the Honourable EXCO member.
For the information of the Honourable Larkin, JSW has submitted a licence application to SPAN in March this year. We, JSW, will also hold discussions with the relevant local authorities (PBT) on whether to extend
or obtain an ELG, extension of time, or other means. These matters are still under discussion. That concludes my reply. Thank you.
Ya, Kempas.
Thank you, Honourable Speaker. I strongly agree with the explanation given by the EXCO for Utilities. Firstly, regarding the capability of Johor Special Water, a subsidiary of PDT, Perbadanan Darul Ta'zim, it indeed has the capacity. When I was Menteri Besar, these were the steps that needed to be taken. With the expertise we have, I feel JSW is confident it can carry out the task if entrusted. This is one of the factors, as is commonly known, that our rivers, especially the Sungai Pandan and also the Sungai Skudai, are among the polluted rivers. Today, two local authorities, namely Johor Bahru City Council and Pasir Gudang Municipal Council, the work of processing this sewage is not carried out by IWK, Indah Water Konsortium. So it is operated by the existing local authorities. And some of the sewage from housing estates and factories is channelled directly into the rivers. That is one of the factors causing river pollution, as in the example I stated when I was Menteri Besar. I see that to preserve these rivers, we must expedite this centralised sewerage operated by the government, because perhaps IWK currently has financial problems and so on. So, I see that if we give concessions to these two local authorities, perhaps they also will not be able to cope, and eventually such matters will drag on.
Your question, Honourable Member, your question?
I need to give this explanation so that a more detailed view can be obtained, otherwise it will be left hanging, and the people will not understand. Like us here, the government is too hasty and does not give opportunities to private companies from outside. One of the factors, as stated by the EXCO just now, is that we are ready and have fulfilled the conditions set by KAT, the Ministry of Water and Land. But since there may be a duplication of applications from another company, I would like to mention here, namely SAJ also applied, so there may be something that needs to be resolved. Therefore, I ask that this relevant EXCO must follow up more closely. When I was, I had already followed up, but there has been no answer until today. This must be carried out. So, my question, I would like to ask here, after my departure, while I was following up on this matter more closely, how many times has our EXCO met with the relevant Minister? Because at the BAKAJ level, all in all, we have no problems. If this is delayed for long, the pollution of these rivers will become more rampant. This means that it is not that we are merely seeking profit for PDT; even if PDT makes a profit, that money returns to the people because it is owned 100% by the government. So, I ask that the Honourable EXCO implement this task, which is very critical. So, that is all, thank you.
Please, the Honourable EXCO member. How many times did you follow up? Please follow up.
Thank you, Honourable ADUN Kempas, for giving such a thorough explanation. For the information of this august House, we are always, not only me but also parties from BPEN and also from the government, always following up not only with the ministry but also with the more relevant agency, namely SPAN, because actually any licence that needs to be issued for this sewerage, for this sewage treatment, must be obtained from SPAN in a more subtle manner. For the information of the Honourable ADUN Kempas as well, the Johor state government strongly supports the licence application by JSW, and we will make every effort to ensure that this application is approved by SPAN in the near future. That concludes my reply. Thank you.
The next question, the Honourable Member for Tangkak. Please.
Thank you, Honourable Speaker. Question No. 6.
To what extent has the policy to modernise and increase the productivity of agricultural activities and to develop the agro-based industry been successfully implemented in Johor?
Please, the Honourable EXCO member.
In the name of God, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of God. Greetings of peace and happiness. Honourable Mr Speaker, regarding what was asked by our friend from Tangkak, the Honourable Member for Tangkak, concerning to what extent the policy to modernise and increase agricultural activities and the agro-based industry has been successfully implemented in the state of Johor.
For the information of the Honourable Mr Speaker and Members of the House, especially from Tangkak, the Johor State Agriculture Department is committed to developing the agricultural sector and our agro-based industry. As a result of the encouragement and support of all parties, whether the state government or the federal government, Johor has become among the leading players in the agricultural industry in our country. The achievement of the state of Johor in agriculture is very encouraging, because Johor is the number one producer of fruits in the country. Meanwhile, for the plantation sector, it is in second place. In addition, the achievements in the agro-based industry are no less impressive. We produce and develop new clones through MARDI, as well as with the reports we have received most recently. The report from the Agri Geo Portal of the Department of Agriculture Malaysia shows that the state of Johor in 2018 produced 1,800 successful entrepreneurs with an annual production total of RM340 million. The state of Johor also recorded the highest yield of agro-based industry products for the year 2018.
For the information of the Honourable Mr Speaker and Members of the House, the government practises agricultural policy in accordance with the National Agricultural Policy. Meanwhile, at state level, we follow the local legislative policy of the state, which is the competent Local Authority. Nevertheless, the state government practises that, Honourable Mr Speaker, if there are agro-based industry entrepreneurs who wish to develop agricultural estates, whether on a small or large scale, they can directly submit an application to the state government. This is because, for the information of the Honourable Mr Speaker and Members of the House, a company in Pagoh, for example, in the process of producing a spice paste industry process, has had to import about 8,000 metric tonnes of ginger and turmeric in one year. So, I see that if there are agricultural entrepreneurs in Johor or any parties interested in developing the agricultural sector, I think these two areas can already help our state and the entrepreneurs concerned. So, the state government practises an open policy: any entrepreneur who wishes to produce agricultural products on a large or small scale, as long as it follows the National Agricultural Policy and does not conflict with land law and so on, God willing, the state government will be able to give good cooperation in this matter. That concludes my reply, Honourable Mr Speaker.
Yes, the Member for Tangkak is invited, supplementary question.
Thank you, Honourable Speaker, and thank you to the Honourable EXCO member for the reply. Yes, we are well aware that agricultural activities or the primary agro-industry in Johor have indeed developed well all this time. So, my question is what assistance will be given, or what advisory services will be provided by the state government to agricultural entrepreneurs who wish to venture into this field of agriculture. Thank you.
The Honourable EXCO member, please.
Honourable Mr Speaker, in terms of assistance for smallholder farmers, all applicants may submit their applications directly to the State Director of Agriculture or to the Agricultural Officer at district level. And God willing, these applicants may also forward their applications directly to me, God willing. In terms of the results expected, for example from the Malaysian Agricultural Research and Development Institute (MARDI), for the information of the Honourable Dato' Speaker and Members of the House, MARDI, through its research and development programme, has launched two new rambutan clones, Rambutan Mutiara Merah and Rambutan Mutiara Wangi. One new starfruit clone, Belimbing Emas, Bintang Emas, is of very high quality and suitable for both export and local markets. So, to any farmers who want these new clones, they may go directly to MARDI or refer to me, God willing, and I will help 100%.
Apart from crops, MARDI also launched a new breed of beef cattle, namely, with permission, KK-Elit, which will be expanded together with Berat Mas. A new breed of goat will also be launched on 21 September 2019 here in Kluang, Honourable Speaker, and for the information of all Members of the House, thank you.
Honourable Speaker…
Rengit.
My supplementary question: among the new sources of wealth that have been recognised and the results of studies that have been carried out are mataq coconut and also pineapple. This has been proven, as the yield of mataq coconut per acre can reach RM1,800.00. If we integrate further with coffee cultivation and also lebah kelulut, stingless bees, it can produce RM4,000.00 per acre a month. This is a new source of wealth, and the areas in Johor are areas with great potential; among the areas with great potential is West Johor. In West Johor, the zone formerly for coconut has been changed to oil palm. Today, we see oil palm prices, Honourable Mr Speaker, are falling day by day, and since Jokowi won as President of Indonesia, our hopes have become dim because China, the largest importing country, takes a large amount of palm oil from Indonesia. This needs to be studied, because if we do not curb it now, it will have a major impact on the country and the income of the population.
Soalan dewan…
But the question has been proven, and the results show that this mataq coconut cultivation has succeeded in producing an income of RM60,000.00, RM70,000.00 a year. I have raised this in this House many times; the issue, Honourable Mr Speaker, is seeds. The mataq coconut seeds currently produced at the Coconut Production Centre in Pagoh can only produce 50,000 mataq seeds a year. 50,000 seeds, for 800 acres a year. Johor has money, our reserves are also large, so why do we not use this opportunity? It has been proven that this is a new source of wealth. Johor should take part in helping the federal government produce these seeds, so that we can distribute them to farmers. This will help increase income and, in turn, help farmers who are facing problems today. So, what steps is the government taking to overcome the shortage of mataq seed supply at present, Honourable Mr Speaker?
The Honourable EXCO member, please.
Honourable Mr Speaker, thank you to the Member from Rengit earlier. For the Honourable Member's information, the Department of Agriculture is in the final stage of preparing a proposal paper to increase, as we are aware, it is indeed acknowledged that there is a shortage of these seeds, and I commend, thank you, because this is one of the newest sources in the agricultural sector. And the Department of Agriculture acknowledges that it is now facing a shortage of these seeds, and we have an agricultural centre in Pagoh, and this will be identified by the Department of Agriculture to further improve and increase the production of coconut seeds, these mataq seeds, for the information of the Honourable Mr Speaker. Thank you.
Pekan Nanas, please.
Honourable Mr Speaker, in the state of Johor there is a large amount of idle land, namely the second largest in the whole of Peninsular Malaysia after Pahang. The question is, what actions will the Department of Agriculture take to ensure that all this idle land, whether it is owned by the government or by the private sector, is developed so that agricultural productivity in the state of Johor can be optimised. That is all, thank you.
The Honourable EXCO member, please.
Honourable Speaker and Members of the House, I have just been planning what we call the Green Revolution (Revolusi Hijau). So, for me, I would like some space and time on the development of idle land in the state of Johor. And God willing, I give assurance to the Honourable Mr Speaker and Members of the House that once the Green Revolution plan to drive the development of idle land in the state of Johor is fully prepared, I will inform all Members of the House. That is all, Honourable Speaker.
The next question, the Honourable Member for Pasir Raja, please.
Honourable Speaker, question number 7.
What is the status of the project to build the new bypass road between Sekolah Menengah and Sekolah Rendah FELDA Bukit Besar, which was stated to be still awaiting a decision from the Implementation Coordination Unit (ICU), Prime Minister's Department (JPM), at the House sitting of 12 August 2018?
The Honourable EXCO member, please.
Assalamualaikum, Honourable Mr Speaker. For the time being, the project has been cancelled. Its implementation is in line with the decision of the Ministry of Finance in a letter dated 26 June 2018, "sekiranya projek yang belum dikeluarkan SST (Surat Setuju Terima) perlu dibatalkan". Based on the visual condition of this project, we found that it is not a priority, as there is an existing route that can still be used, together with the traffic conditions, which are not urgent, thank you.
Yes, Panti, please.
Thank you, Honourable Speaker, and thank you for the answer from the Honourable EXCO member. However, I would like to ask: according to the answer the Honourable EXCO member just gave, this project was cancelled based on a letter in June 2018, but according to the question that was submitted by Pasir Raja, it was previously asked about the status of this project and the answer given was that it was awaiting a decision from the ICU, JPM, at the House sitting of 12 August. How could this happen, meaning that a decision was made in
June 2018, yet in August 2018 the answer given is not the same as what is being given today. Thank you.
The Honourable EXCO member, please.
According to the information I have, or that the Public Works Department (JKR) has, the cancellation was on 26 June 2018. What is important here is that it is indeed recorded here that it was cancelled, but our side can consider it if there is an appeal regarding the project, if it is urgent. But from what, from the examination carried out by JKR, there is indeed no urgent need in the area concerned. Thank you.
The next question, the Honourable Member for Machap, please.
Honourable Mr Speaker, question number 8.
What efforts have been made by the Johor State Government to assist smallholders of rubber and oil palm who have been affected by low commodity prices?
The Honourable EXCO member, please.
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Honourable Dato' Speaker and Members of the House. Thank you for the question from Machap. To assist smallholders, Honourable Dato' Speaker, who are facing the problem of falling rubber commodity prices, several steps have been implemented by the government through the Malaysian Rubber Board and also the Rubber Industry Smallholders Development Authority (RISDA). The Rubber Production Incentive, also called IPG, is an assistance given by the government of between RM10.00 and RM1.45 per kilogram. For every kilogram of cup lump produced by smallholders when the monthly average price of SMR20 FOB rubber is at the level of RM5.50 per kilogram, or when the monthly average price of cup lump is at the level of RM2.20 per kilogram or below. This assistance for latex is also given at the rate of RM0.90 per kilogram, which is 100% dry rubber content.
For the information of the Honourable Mr Speaker and Members of the House, RISDA has also provided an allocation totalling RM200,000.00 for building rubber collective sales depots in 2019. Through these collective sales depots, rubber sales will be carried out by tender, where the best price will be given to smallholders. Basically, the price at these depots is higher by between RM0.20 and RM0.50 per kilogram, and the collective sales method is estimated to give smallholders an extra income of nearly RM100.00 a month, based on an average plantation ownership of 1.7 hectares. In December 2018, RISDA spent RM8.159 million to help rubber smallholders in Johor facing the problem of the monsoon season. This assistance worth RM600.00 has benefited a total of 13,559 rubber smallholders in the state of Johor.
Honourable Mr Speaker and Members of the House, according to the statement from MPOB, to strengthen palm oil prices, the Ministry of Primary Industries (MPI) has implemented several immediate and long-term measures to minimise the impact of the price fall, especially on the income of smallholders. Another immediate measure implemented by MPI to further increase the use of palm oil is through increasing the blend of palm oil bio-fuel with diesel, petroleum, from Program B7 to Program B10 in the transport sector beginning December 2018. This is followed by mandatory implementation from February 2019; the government will also implement Program B7 in the industrial sector beginning July 2019 on a mandatory basis.
The implementation of Program B10 in the transport sector and Program B7 in the industrial sector is expected to involve the use of palm oil and bio-diesel, estimated at a total of 761,000 tonnes a year. This will contribute to reducing local oil stocks, thereby strengthening palm oil prices.
For the information of the Honourable Mr Speaker and Members of the House, the palm oil price to date, the latest palm oil price up to 2 July 2019, is RM1,877.50 per tonne. Data on palm oil planting areas for the state of Johor in December 2018 are as follows, Honourable Speaker: mature palm oil area totalling 680,562 hectares, immature palm oil area totalling 67,000 hectares. The overall total for the state of Johor is 747,562 hectares. Thank you, Honourable Speaker.
Yes, Machap, please.
Honourable Mr Speaker, thank you to the Honourable EXCO member who has explained the efforts made to stabilise rubber prices and also palm oil prices. What we see now is that smallholders of rubber and palm oil are indeed affected by these commodity prices, which still remain at a low level, moreover with fertiliser and pesticide prices that are constantly rising. There is also a suggestion from the minister that we can try to increase the price of rubber and palm oil by tapping during the monsoon season, drinking one spoonful of palm oil every day, and there is also a suggestion to plant bamboo, to plant bamboo that can be intercropped with rubber or palm oil plantations. So, has the Johor State Government responded to the suggestion to plant bamboo by providing advisory services or otherwise? Earlier, the Honourable Member for Rengit stated that planting mataq coconut and also pineapple can help towards increasing the income of smallholders. And I would also like to ask for clarification regarding RISDA. Is RISDA still encouraging or providing allocations to rubber smallholders, when I see that some of them have old rubber trees but find it difficult to apply for RISDA assistance for replanting? That is all, thank you.
Please, the Honourable EXCO member.
Thank you, my friend. For the information of the Honourable Mr Speaker and Members of the House, beginning in 2019, the government has introduced a scheme called the Oil Palm Smallholders Replanting Easy Loan Scheme (TSPKS) and the Agricultural Input Easy Loan Scheme for Smallholders (IPPKS), involving an allocation totalling RM550 million. So, if there are RISDA smallholders who face this problem, they may refer directly to RISDA to obtain this assistance. In terms of efforts to increase yield, for the information of the Honourable Mr Speaker, my friend and all Members of the House, an understanding has been reached between RISDA and the Pineapple Board under my portfolio, that any RISDA smallholder crop that is replanted will be integrated with MD2 pineapple cultivation and additional intercropping with black pepper. Those are the efforts to increase the income of RISDA smallholders, Honourable Mr Speaker. Thank you.
Yes, Layang-Layang, please.
Thank you, Honourable Mr Speaker. Thank you, ayahanda (father), Honourable EXCO member. Pantun sold, pantun bought. A female deer with striped legs, like a flower that failed to bloom; the young we cherish, the old we respect. (The House applauds.) My question is, is this a continuation of Machap's question, and does the government...
Your question should be in the form of a pantun, Honourable Member.
It continues, it is connected...
Silakan.
Does the state government agree with the minister's proposal for the campaign that one spoon of palm oil be eaten every day to raise commodity prices? Thank you.
The Honourable EXCO member, please.
Honourable Mr Speaker and Members of the House, if we think logically, drinking this palm oil, drinking palm oil, drinking palm oil juice or palm oil, would certainly be harmful to the body. Perhaps there is some other justification the minister meant. So far, in any meeting of our State Executive Council, we have not taken a decision on this matter. Thank you, anakanda (child).
The next question, I invite Tiram.
Honourable Speaker, Mr Speaker, question number 9.
The Sungai Kopok in Perigi Acheh, DUN Tiram, constantly suffers from river pollution. Although this problem has existed for a long time, the pollution is now getting more serious, and the river water has turned black. Please, the relevant department should take action.
Yes, please, the Honourable EXCO member.
Thank you, Honourable Speaker, and thank you to the Honourable Member for Tiram for raising this question regarding the pollution of Sungai Kopok in Perigi Acheh, DUN Tiram. For the information of the Honourable Member for Tiram and this esteemed House, the Department of Environment has taken note of the pollution issue occurring in Sungai Kopok, Perigi Acheh. Based on the records we have, a total of 8 complaints about pollution of Sungai Kopok have been received by this department since 2018, and these complaints relate to changes in water colour, river water that smells foul and is black, and there have also been incidents of dead fish.
For the information of this esteemed House, the findings of the investigation carried out by the Complaints Unit, Johor Department of Environment, as well as the results of the analysis report of river water samples that were taken, found that the main cause of pollution in Sungai Kopok is the discharge of industrial effluent with a high organic load, especially from palm oil-based industries such as Orient Chemical, Asal bio diesel soap, and food-based factories. However, all these factories have been equipped with effluent treatment plants, but there are still some that are negligent in controlling discharge from their premises, causing effluent to be released without being treated first.
For the information of the Honourable Member for Tiram, a thorough investigation into all suspected sources of effluent discharge is continuing, and enforcement actions such as orders to stop operation of equipment, notices of direction, compounds and court action will be taken if there is a breach under any regulations or sections under the Environmental Quality Act 1974 and its subsidiary regulations. That is all, thank you.
Honourable Mr Speaker...
Ya Tiram.
Supplementary question: I would like to know whether Tiram has identified Sungai Kopok here, and also I would like to know whether the classification of rivers closest to the Tiram state constituency area is polluted or not polluted? Is there a classification, segregations, with permission. Thank you.
Jemput.
For the Honourable Member, for the information of the Honourable Member for Tiram regarding this classification, we have monitoring stations installed at certain locations to obtain readings of the effluent discharge level in each of the rivers that have been identified. For the information of the Honourable Member for Tiram, the Johor State Department of Environment has set up 227 manual river stations and 4 automatic river stations in the Segamat River, in Johor, yes. Muar River, Johor River and Skudai River, covering 21 river basins consisting of 102 rivers in the state of Johor. Apart from that, to better control effluent discharge rights, we need integrated action not only from the Department of Environment but also from BAKAJ (Johor Water Regulatory Body) and related departments so that we, what is this, continue to monitor the water quality of rivers in the state of Johor so that they are not polluted.
Ya Senggarang.
Thank you, Honourable Speaker, and thank you for the answer from the EXCO member. Supplementary question: the Honourable EXCO member has answered that the Department of Environment has identified, among the main causes, that it is due to palm oil mills. My question is, what action has been taken against the palm oil mill that caused the pollution of Sungai Kopok in Perigi Acheh, DUN Tiram, whether it has been closed or compounded, that is what I want to ask.
Jemput YB.
As I explained earlier, we have received complaints of pollution. If, after we carry out investigations and enforcement actions, any offence, or any breach under any regulation or section under the Akta Kualiti Alam Sekeliling and also its subsidiary regulations, is found, we will take enforcement action. Thank you.
Next question. I invite Penawar.
Bismillahirrahmaanirrahim. Assalamualaikum warahmatullahi wabarakatuh. My question is number 10.
How many overseas work trips have been undertaken by the Chairman of the State Committee on International Trade, Investment and Utilities, and what was their cost from May 2018 until now?
The Honourable EXCO Member, please.
Thank you, the Honourable Member for Penawar. Honourable Mr Speaker, the Honourable Member for Penawar has asked how many overseas trips have been undertaken by the Chairman of the State Committee on International Trade, Investment and Utilities, and what their cost was from May 2018 until now?
With pleasure, I am pleased to inform this august House that the state government, through the Johor State Investment Centre or JSIC, has organised trade and investment promotion missions, which we call trade missions, overseas led by the EXCO for International Trade, Investment and Utilities of Johor, to attract investment from abroad, whether by working together with the Ministry of International Trade and Industry (MITI) through its agency, the Malaysian Investment Development Authority (MIDA), or through the state's own investment promotion missions. Through these trade missions, the state government has been able to channel and convey information and promote the state of Johor to foreign investors regarding investment potential in the state of Johor, whether through investment seminars, meetings, or business matching. JSIC also plays a role in building networks of investment promotion through MIDA offices overseas.
For the information of this august House, generally a total of 11 official work trips or programmes overseas have been carried out within the period of one year from May 2018 until now, June 2019. Because the Honourable Member for Penawar has once mentioned in this House that he likes long things, I will give him this long list.
1. Trade mission to Singapore on 27 August 2018. 2. Trade mission to Xiamen, China, to attend the Seafeed EXPO, 8 to 11 September 2018. 3. Trade mission together with MITI and MIDA to Tokyo, Osaka, Japan and then Seoul, South Korea, 14 to 20 October 2018. 4. Trade and investment mission to Jakarta, 23 to 26 October 2018. 5. Trade mission together with MITI and MIDA to France, the places involved being Lyon, Toulouse, Paris and Lille, in November 2018. 6. Trade mission to the United Emirates and Dubai, 16 to 20 February 2019. 7. Trade mission to Indonesia, 14 to 17 March 2019. 8. Trade mission to China including Guangzhou, Shanghai, Suzhou, Luan, Huanggang and Wuhan, from 26 March to 2 April 2019. 9. Trade mission to Tianjin, Beijing, China, 16 April to 19 April 2019. 10. Another trade mission to China covering Guangzhou, Huizhou, Shenzhen, 27 May to 2 June 2019. 11. Trade mission to Tokyo, Osaka and Seoul once again together with I2M and also Khazanah, 16 to 22 June 2019.
For the information of this august House, we have made plans and will make one more trade mission to San Francisco and Silicon Valley in the near future. In summary, the total involved and the cost is RM868,352.00. Through the trade missions listed above, the state government has received positive feedback from those investors and experts, and will take follow-up action on every discussion held during these missions.
RM868,000.00 is not even RM1 million, but the returns were RM24 billion, yes?
That's right, Mr Speaker.
Jemput Penawar.
Thank you, Honourable EXCO Member. Dangerous, men who like long ones, Mr Speaker. Are these also the kind who like bottoms?
This question has nothing to do with it, Honourable Member. Are you interested in a treatment trip anywhere? The Honourable EXCO Member, please.
That's why one has to be provoked first before he wants to fight back. Honourable Speaker, my supplementary question is: what returns did the government obtain from the trip? And I want to point out that today the media chairman is a true son of Johor, a Kluang man. That means the state government can also use ways to obtain better investment. That is my question, and I want to remind them not to let what is chased go unobtained and what is left behind be neglected.
The Honourable EXCO Member, please.
I want to respond first to the question, not question, the statement from Penawar. I never said I like long ones. He is the one who said he likes long ones; I like big ones.
Let us stop debating this long and short business. (House laughs).
The big-hearted one, yes. It's alright. For the information of the Honourable Member for Penawar, as I have presented earlier, for 2018 we have obtained a total FDI investment of almost RM24 billion. For information, if I were to refine it further, in fact from 1 January to 30 June 2018, the investment in Johor was only RM1.7 billion. The rest came after we won the election, when it soared to almost RM24 billion. (House applauds). I am not trying to take credit, I want to be honest. I understand the previous government also made efforts, but I just want to emphasise here that this victory will certainly give an impact to investors, that they are more confident in the PH government and the reform institutions we have made. That is why investors continued to commit to invest in Johor after our victory. That is all, thank you. (House applauds).
Next question. I invite Pekan Nanas.
Honourable Mr Speaker, my question is Question 11.
List the names of the developers who failed to complete affordable housing projects, the locations, the number of affordable housing units involved, the amount of penalties and the action taken by the government in 2013, 2014, 2015, 2016, 2017, 2018 and 2019, separately by district.
The Honourable EXCO Member, please.
Assalamualaikum warahmatullahi taala wabarakatuh. Honourable Mr Speaker. Thank you to Pekan Nanas for the question. List the names of the developers who failed to complete affordable housing projects, the locations, the number of affordable housing units involved, the amount of penalties and the action taken by the government in 2013 until 2019, separately by district.
Honourable Mr Speaker, the list of developers charged penalty fees for Johor Affordable Housing from 2016 to 2018 covers several different penalties. Previously, a penalty of MR20,000.00 per unit was imposed. There were also those imposed at 40 and also 60 if following the policy we approved last year. We have in fact amended RM40,000.00 per unit as a penalty fee for lump sum payment, with permission, or RM60,000.00 per unit for payment by instalments over two years in four instalments. The total number of housing developers involved, who were penalised from 2016 until 2018, is as follows: Johor Bahru district has 41, Kulai, 13; Kluang, 6; Batu Pahat, 7; Muar, 4; Segamat, 8; Tangkak, 2; Kota Tinggi, 5 and Pontian 2. I am not sure whether I should mention them one by one or give you a written answer.
Put it in writing if there are many, in writing, Honourable Member.
In writing. So that is all, Honourable Speaker. The total is from 2016 until 2018, as I have mentioned earlier. That is all, Honourable Speaker.
Yes, Pekan Nanas.
Honourable Mr Speaker, what are these penalties used for? Will they be used for building affordable housing in the future? And have they been used in the past? Thank you.
The Honourable EXCO Member, please.
Thank you for the supplementary question from Pekan Nanas. All these penalties are put into a special fund known as the Bumiputera Lot Release Fund (Tabung Pelepasan Lot Bumiputera). When I took up the post of EXCO for Housing in June last year, although the account balance was positive, after taking into account commitments to several payments and liabilities, the balance was negative, if I am not mistaken RM35 million. And, thankfully, after we collected the latest penalties, the amount has turned positive again, at about RM33 million. And it is clearly stated that when this fund was created by the state government, the use of this money is for the construction of affordable housing and matters related to it. This includes maintenance that we carry out, and payments related to Johor State Affordable Housing will be paid from that money. And there is another matter, the penalty money, let me see, Honourable Speaker, one moment. Okay, the replacement charge, sorry, I was confused just now. For this replacement charge, the 40 or 60,000, this is not under the Bumiputera Lot Release Fund, sorry, it is included in the Utilities and Residential Structure Development Fund. This fund, currently, is not under SUKJ Housing; it is placed under the consolidated account under the state government. The account under housing is the Bumiputera Lot Release account, which is charged a replacement charge of 7.5%. That is all, Honourable Speaker.
Ya Tiram.
Honourable Mr Speaker. Thank you to the Honourable EXCO Member. What are the usual reasons for failure to complete these projects, and is it also because they failed to select those offering the contract? Thank you.
The Honourable EXCO Member, please.
Honourable Speaker, the usual reasons for this failure are due to several factors, and as I have said in my earlier speech, from the report of the Johor Housing Task Force, there are more than 100,000.00 units of Johor Affordable Housing that were supposed to be built by housing developers but were not built. Among them is due to weaknesses in the Johor People's Housing Policy itself, for which we have carried out an improvement process that came into effect on 1 April 2019. And it also includes one example that I can bring up in this sitting this morning, which is the amendment of planning permission at the Local Authority (PBT) level. Say the initial approval by the state planning committee (KM) was in 2010, then the developer did not carry out the housing project until 2019, and during 2019 the economic situation had changed. The components of the development approved by KM in 2010 have changed due to the passage of time. What the housing project does is submit a new plan, suited to market demand and supply, and usually what happens is a reduction in the number of affordable housing units. This is why the penalties I mentioned earlier, 40 and 60,000, need to be imposed, so that we can use that money to build affordable housing in other projects. That is all, Honourable Speaker.
It is almost 11.00. I think I will end this oral question session. Any listed questions not yet answered orally will be answered in writing during the same sitting.
REPORTER: Written Questions. The answers to written questions by Honourable Members have been tabled on the table of the meeting.
Continuation of debate on expressing gratitude for the Royal Address of His Majesty the Sultan of Johor.Address / budget
Honourable Members, the sitting is now resumed. I invite the Chairman of the Housing, Communications and Multimedia Committee to deliver the winding-up. Please proceed.
Thank you, Mr Speaker. Assalamualaikum warahmatullahi taala wabarakatuh. Mr Speaker and all the Honourable Members. First, I would like to record my thanks to Mr Speaker for giving me the opportunity to speak in this morning's winding-up session. I also take this opportunity to humbly extend my highest gratitude for the consent of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan of Johor, to attend this honourable House and to further command the opening of the First Meeting of the Second Session of the 14th Johor State Legislative Assembly.
At the same time, I also humbly extend congratulations on the birthday of His Royal Highness Tuanku Ismail Ibni Sultan Ibrahim, Tuanku Mahkota Johor, on his birthday on 30 June last. I also take this opportunity to thank all Honourable Members, whether on this side or the other side, who took part in the debate giving thanks for the Royal Address, particularly regarding the Housing, Communications and Multimedia Committee.
Mr Speaker, I also wish to record my congratulations to the Most Honourable Bukit Kepong on his appointment as the 17th Most Honourable Menteri Besar of Johor recently. I pray that the state of Johor, which we love, will continue to prosper and be blessed under his leadership. I also wish to record my thanks to the Most Honourable Kempas, former Most Honourable Menteri Besar of Johor, for his service and contribution to the state and people of Johor during his tenure as Menteri Besar of Johor.
Mr Speaker, in obeying the command of His Royal Highness, who stated that every leader who has been appointed has a necessary and great responsibility in bearing the trust of the people and also the state of Johor, and must carry out duties with honesty and sincerity and always put the people and the state first. This reminds me of the meaning of a hadith of the Prophet Muhammad SAW, which means: be aware that each of you is a leader and each of you will be held accountable for your leadership. The Messenger of Allah SAW also reminded us as leaders with a firm warning through the meaning of his hadith: whoever is entrusted by Allah to lead his people, and dies while deceiving his people, Allah SWT will surely forbid Paradise to him. (Hadith narrated by Muslim, status of the hadith: sahih). It is best that we pray that all of us in this honourable House as leaders may receive the protection of Allah SWT and, God willing, enter His Paradise through the gate mentioned in the following hadith, whose meaning is that there are seven groups of people whom Allah will shade on the day when there is no shade except His shade: a just leader, a just imam.
Mr Speaker, throughout the four days of debate in this honourable House, there has been much criticism, critique, suggestions and not a little condemnation given by Honourable Members on that side as well as on this side. The Johor Pakatan Harapan Government practises an open door and freedom of expression without any reprimand or criticism, especially in our efforts to improve the quality of service and quality to the people. However, the state government will not tolerate or compromise on the throwing of slander, especially that motivated by an intention to tarnish the image of the state government or to instil hatred of the people towards the Johor Pakatan Harapan Government.
Mr Speaker, what I see is that the friends of the Honourable Members on that side find it difficult to give notation or to acknowledge some of the successes that have been achieved and created by the Johor Pakatan Harapan Government. I am reminded of a story, perhaps Mr Speaker may remember it, the story of a father and son with a donkey. Where, whenever, both the father and son drag the donkey without riding it, people will say that the father and son are not clever, because there is a donkey and the vehicle is not being utilised. When both the son and father ride on the donkey, society says that the father and son are cruel because they ride the donkey together and it is a burden. And it also happens the other way round: when the father rides the donkey, the son pulls it, and people say this father is cruel because his small son is pulling while he rides the donkey. And when the son rides the donkey, the father pulls it, and the people say this son does not appreciate his father's sacrifice. His father raised him, and then he sits on the donkey while his father pulls. So, I hope my friends over there do not become like what I mentioned in that story, two: the father and son together with the donkey.
Among the successes mentioned by the Honourable Member from Bukit Batu a moment ago, is that the FDI received by the Johor state government is far higher than in 2017 which I had mentioned, namely RM24 billion compared with RM5.1 billion. Mr Speaker, throughout the four days of debate there were also many expressions and terms, with permission, jargon, that were interestingly uttered by either the YBs on that side and also here. Among the expressions that interested me is, "stop politicking and just get on with the work". But the irony is that when that side raises any matter, they also do it in a political way. The Malay proverb states, "like the crab teaching its young to walk straight". YB Penawar, for example, made a statement during the debate last Wednesday, saying that the BN government imposed a land premium for the Second Generation Housing at RM0.40 per square foot, whereas the Pakatan Harapan government raised the payment to RM1.00 per square foot. That is, an increase of 150%. Indeed,
the Honourable Penawar stated that the government in fact had no reason to raise the premium payment so suddenly. This is one example of political statements that have bad intentions, especially to portray the state government as cruel, Pakatan Harapan as not good, and BN, or now more friendly with PASNO, as better, even though the reality is not so.
Mr Speaker, the government imposes land premium payments not arbitrarily but based on the Johor Land Rules, or in short JPU 94, which came into force in 2004, where the premium for house plots is calculated at either 15% or 30% of the current market value. With permission, the market value, which is usually determined by the Valuation and Property Services Department, in short JPPH, is for a lease period of either 60 years or 90 years. Based on the preliminary review by the PTG, there is no premium or land grant for house plots included in the FELDA Second Generation that is set at RM0.40 per square foot. Even if there were, the premium imposed at the rate of RM0.40, that is merely coincidentally the same as the calculation guide of 15% or 30% of the current market value that I mentioned earlier. The key word, or keyword, is market value. The current market value of a piece of land will differ according to different dates.
Mr Speaker, YB Pekan Nenas has touched on the increase in unsold residential property, with permission, overhang residential properties, and also the rising house prices in the state of Johor. The Honourable Pekan Nenas also expressed concern about the mismatch, with permission, between demand and supply. I would like to state that the Johor People's Housing Policy, DPRJ, only sets a quota of 40% Affordable Housing out of the total number of units to be built in a housing estate exceeding 5 acres. This means that the remaining 60% component will be left to the discretion of the housing developer to determine the type and price, especially so that they can generate as much income as possible from their project investment. In other words, the state government can only give its views through the planning permission application, KM, Planning Permission at the PBT level, the Local Authority, and moreover where we ask housing developers to submit the market study report, with permission, or feasibility study.
However, for developers who are sensitive to market sentiment, namely demand and supply, they will only build types of development that have demand and supply in the market. YB Pekan Nenas also asked about the effectiveness of the policy that allows housing developers to pay replacement charges of RM40,000.00 or RM60,000.00. In fact, replacement charges are only allowed in two situations.
First, at the stage of the planning permission application if the required number of Affordable Housing units cannot be fulfilled due to natural constraints of the land or the land acquisition process that has occurred on part of the property to be developed.
Second, at the stage of amending the KM, following changes in market sentiment for a type of property. This replacement charge is used to build Affordable Housing in other places as I mentioned earlier.
The suggestion of the Honourable Pekan Nenas for the government to provide state land for the construction of Johor Affordable Housing has in fact already been and is being implemented. The state government provides funds of approximately RM100 million a year for the purpose of obtaining suitable Affordable Housing sites in every district in the state of Johor. Either through sale and purchase negotiations or by using the Land Acquisition Act 1960. Usually these lands are placed under the Perbadanan Setiausaha Kerajaan, or in short SSI (State Secretary Corporation). These funds are obtained from
the Bumiputera Trust Fund as well as the Social Infrastructure Trust Fund managed by the Office of the State Secretary, Housing Division. These lands will then be developed into Johor Affordable Housing by government-linked companies such as KPRJ and PIJ, state GLCs, or developed through joint ventures with the federal government or with private housing developers.
Mr Speaker, YB Tenggaroh, in his speech, stated that among the achievements of the state government over one year was the abolition of the vertical quota of the government, or in short, KMK. Whether this praise or acknowledgement is sincere or not, I am not sure, but at the very least YB Tenggaroh acknowledged that the abolition of the KMK quota is one of the successes of the Johor Pakatan Harapan Government in ensuring that subsidised Johor Affordable Housing reaches its target group.
YB Tenggaroh asked about one year ago, how many Johor Affordable Housing units had been allocated by district, estate and also race, namely Malay, Chinese and Indian? The government has also introduced a new system to replace the old allocation system I mentioned, which we implemented on 1 August 2018, that is last year, and this system is known as the Johor Affordable Housing System, or in short, SP2MJ. The improvements also cover the procedures for offering, eligibility conditions of applicants, the list of document verification, and methods of publicity. Since its introduction, 27 approvals have been given involving 3,599 units of Johor Affordable Housing. Overall, the allocation by quota is as follows: Malay race, 1,874; Chinese race, 713; Indian race, 288; citizens' concern quota, 408; youth quota, 168, and persons with disabilities quota, OKU, 168. The table below shows the allocation of quotas by district with approvals as required by YB Tenggaroh, and God willing, I will submit the breakdown by district as a written answer.
The quotas mentioned just now are based on the following breakdown: the public quota represents 80% of the total units offered, of which the share for Malays is 65%; Chinese, 25%; Indians, 10%; the youth quota is 5%; the OKU quota 5%, while the citizens' concern quota is 10%.
Mr Speaker, YB Endau asked about the status of Londang Batu. The Londang Batu housing project built on PTD 6121 Mukim Endau with an area of 9.38 acres is a proposal to relocate residents who are often affected by flooding, namely in Jalan Bulang, Jalan Dato' Mohd Ali, Tanjong Merit and Kampung Sungai Padang. This project is under the management of UPEN, or now, BPEN. The project is carried out by Johor Land and was started in 2016. The development component covers 156 units, Type A, 16 x 60, 134 units. Type B, 16 feet x 60, totalling 22 units. Physical completion works took place on 31 July 2018 and the Certificate of Completion and Compliance, or in short CCC, was issued on 11 March 2019. And the handover of vacant possession to BPEN was made on 4 April 2019. This means the project has been fully completed and the CCC has been issued. And the status of this development now is at the final stage of distribution based on eligible candidates as verified by the cleansing exercise of the Mersing District Office, specifically these 88 recipients who are from residents affected by the flood area, the majority of whom are fishermen. The breakdown is that 10 units are asnaf houses under the Johor Islamic Religious Council (MAIJ), 88 units are for relocation of fishermen, or as I mentioned earlier, the area affected by flooding, and 58 units will be offered to the public under the management of SUKJ Housing Division. These units will be handed over to BPEN and the Mersing District Officer at the stage of cleansing the list of 88 fishermen I mentioned earlier, and will be included under the Rent-to-Own Scheme, also known as Jauhar Prihatin, which will provide Jauhar Prihatin under KPRJ. BPEN will prepare a working paper for approval at the next MMK meeting in the near future.
So, God willing, YB Endau, do not worry, the distribution of these 150 units will be carried out this year too, God willing.
Mr Speaker, YB Panti asked about the status of Bandar Petri Jaya. I would like to mention the chronology of the Bandar Petri Jaya housing. First, Bandar Petri Jaya is a new town that was developed by KEJORA in 1982. Phase 1 was developed with 218 low-cost housing units and was completed in 1982. The development of this housing covers infrastructure facilities as well as social amenities, with permission. Due to demand from local residents, especially the Second Generation of KEJORA, an approach was taken to develop the remaining vacant lots in Bandar Petri Jaya. In 2019, the Ministry of Rural Development approved an allocation of RM10 million for the development of Affordable Homes in Bandar Petri Jaya which covers the infrastructure development cost only. Meanwhile, the housing development cost and other incidental costs will be fully borne by KEJORA.
For the purpose of this development, infrastructure works will be carried out in Phase 1. The construction involving the allocation of RM10 million covers the cost of consultancy for preliminary works, survey works, earthworks, reclamation and cutting, cut and fill, with permission, the preparation of bituminous roads, drainage works, provision of electricity supply including the TNB substation, a sewerage treatment plant (STP), estimated at 550 PE, and water supply preparation works including water tanks. There are 180 housing plots to be developed, covering medium-cost houses with an area of 850 to 1,000 square feet. However, this housing development will be developed in phases, where Phase 1 involves only 40 housing units, and the remainder will be developed based on the sales performance of the 40 housing units in Phase 1. The sale of these houses will be managed by KEJORA itself. The latest status as of June 2019 is that the project is at the stage of appointing a consultant. It is expected that the appointment of this consultant will be completed in September 2019.
Honourable Mr Speaker, YB Penawar asked for the second time, I think, after his first as a supplementary question, regarding the status of Taman Penawar Harmoni developed by KEJORA in Desaru. The development of Taman Penawar Harmoni covers Type A Affordable Housing units priced at RM40,000.00, totalling 131 units, RMBC units priced at RM150,000.00 totalling 112 units, and 65 single-storey medium-cost shophouses, including 32 single-storey terrace houses, making the overall total of this project 551 units.
The latest status, which I am pleased to share with YB Penawar, is that Taman Penawar Harmoni has been fully completed and the Certificate of Compliance and Completion, or CCC, has been issued, and this project has been registered under the SUKJ Housing for approval by the Housing, Communications and Multimedia Committee on 3 April 2019 for offering to the public. The KEJORA Board of Directors meeting on 25 July 2016 decided that 180 units would be allocated to KEJORA staff, 111 units for the KMK political quota, and 228 to be offered to the public. However, the Committee Meeting and MMK approved only 27 units for the KEJORA employee quota, and the MMK political quota was changed to the public quota. This is because the Pakatan Harapan government has abolished the developer quota for staff as well as the KMK quota.
KEJORA actually received a grant or allocation of RM25 million from the Ministry of Rural Development, with a proposal that some 139 units be allocated for KEJORA staff. KEJORA's appeal letter, supported by the Ministry of Rural Development dated 20 June 2019, has been received and, God willing, will be considered. The component of 30 semi-detached houses may be sold by KEJORA to staff because the semi-detached houses priced at RM300,000.00 per unit are not
included in the Johor Affordable Housing quota. God willing, the application for an additional 107 units for KEJORA staff will be tabled at the nearest State Government MMK Meeting for approval.
Mr Speaker, YB Permas asked about the status of the development of 100 squatter relocation units in Senibong, where construction began on 15 January 2018, because progress payments to the appointed contractor were not made as they should have been. Mr Speaker, the relocation project for the Senibong residents and several other villages in Plentong does not involve progress payments to the developer, namely Tebrau Bay Sdn. Bhd. The development method is through a land swap, with permission, between land owned by Tebrau Bay occupied by residents and land owned by the state government. There is no stop-work order except for internal issues between Tebrau Bay and the contractors or sub-contractors appointed by them.
Mr Speaker, YB Pengerang asked about the status of the PPR people's housing project at Kampung Punggai, whether it would be resumed after being abandoned for so long. For the information of Mr Speaker, the PPR at Kampung Punggai is named PPR Pengerang. The construction of all PPR projects is under the responsibility of the Ministry of Housing and Local Government, or in short KPKT. For the PPR Pengerang project, the rescue contractor appointed by KPKT is AM Rich Construction Development Sdn. Bhd. The date of site possession was 25 March 2019, while the expected completion date is 24 September 2021. For the information of the honourable House, the progress information presented by the contractor to KPKT at Site Meeting No. 3/2019 on 23 June 2019 is as follows: works on site until 16 June 2019 physically, the original schedule progress was 2.87%, the actual progress was 2.87%, meaning no delay has occurred, and God willing, the PPR Pengerang project will be continued by the contractor or developer appointed by KPKT.
Mr Speaker, YB Penggaram raised the issue of the use or disruption of internet services around the town of Batu Pahat. For the information of all Honourable Members, according to information from Telekom Malaysia, or in short TM, several areas in Batu Pahat, Johor are experiencing service disruption following severe damage to their main cable. Among the affected areas are Taman Pantai Minyak Beku, Taman Ampuan, Taman Joseph, Taman Seri Pantai, Taman Batu Pahat Taman Maju, Taman Makmur, Taman Soga, Taman Mas, Parit Kangkung, Kampung Petani, Taman Banang Ria, Taman Banang Height, Taman Nira, Taman Damai, Parit Lapis Darat and also Parit Gantung. Until now, TM has succeeded in repairing most, nearly 90%, of the damaged cables and is expected to be fully completed on 15 July 2019. That means in the near future, Mr Speaker. At the same time, TM is also studying and identifying careful plans to upgrade internet services in the area as a long-term measure. TM is also always ready to work closely with the state government and related agencies in providing stable internet services and quality service to be enjoyed by the people of Malaysia, especially the people of Johor. TM is very concerned about the problems that have arisen and is working hard so that the problems can be overcome immediately.
Mr Speaker, I also extend my thanks to YB Skudai, YB Gambir and also the Honourable Maharani who are very concerned about the digital economy specifically for the state of Johor. Understanding the needs of the state and its society in facing the digital economy, the Johor state government will focus on first providing public infrastructure so that digitalisation planning for the state of Johor, whether through digital government and also the digital economy, can be implemented properly. Among the matters that will be given due attention by the Johor state government at this time are, firstly, the National Fibre Optic and Connectivity Plan, or in short NFCP, secondly, the 5G special task force, and thirdly, the digital economy. The NFCP Plan, Mr Speaker, is a ministerial matter, namely through SKMM, or MCMC, which has drawn up this plan for a period of 5 years, from 2019 until 2023, which aims to provide digital connectivity that is sustainable, comprehensive, quality and also affordable. And secondly, this NFCP plan also aims to set the direction for the implementation of policies and initiatives that support the digital economy, creating a conducive environment for the use of future technology.
Mr Speaker, secondly, the 5G special task force. 5G technology is the evolution of the latest mobile communication technology that is able to increase broadband access speeds up to 20 gigabytes per second, or 10 times higher speed compared with 4G. Connection reliability is better at low latency rates and the connection of machines, or in short M to M or sensors, for a wider application of the internet of things, or IOT. This 5G technology is seen as able to support our country's digital economy vision, which we expect this 5G system to be implemented no later than 2021 and also 2022.
The digital economy: the world's communities today are undeniably racing to lead the economy, now traditional business operations are seen as rather difficult to compete with data-based businesses. Therefore, the state government is committed to ensuring that Johor does not fall behind in global competition, taking advantage of the opportunities available to explore the digital economy sector. For the information of the House, the state government is in the process of introducing the Johor digitalisation programme through an e-directory with the use of the domain names johor.my and also johorbestari.my. This initiative also enables Johor to be a state that is forward-looking in the use of digital technology, besides giving opportunities to more companies in Johor, including SME Micro, and global market management through the creation of an e-directory link with increased online presence.
Mr Speaker, finally I would like to state that the Johor government has 10 offers to be implemented within 5 years, as stated in the Johor Pakatan Harapan manifesto. One of these offers relating to my portfolio or committee is to target the construction of 100,000 units of Johor Affordable Housing by 2023. This manifesto is part of the direction or planning of the government and will certainly be followed by strategies on how to achieve and realise the direction and planning just mentioned.
As I have explained in the oral answer on Sunday during the debate, to date 2,305 units of Johor Affordable Housing have been completed throughout 2018, 3,590 units have been approved by the Housing Committee for offering to the public, and also as many as 21,374 more units are at the approval stage, at which we are confident that, God willing, they will be completed by 2023. I am confident, God willing, that the state government is on the right track to achieve the target of 100,000 affordable housing units, and I ask that both Honourable Members from this side and from that side join forces to ensure that these 100,000 units can be provided for the people or the Johor race. Let us not belittle or create a stigma that this is impossible, nothing is truly impossible for us to do (Quranic verse). We strive with the best of our ability and then we place our trust in Allah SWT.
Mr Speaker, once again I extend my thanks for the constructive criticism and critique, whether from Honourable Members on this side or from that side. God willing, the criticism and critique which I am confident comes from a clean intention and with a feeling of love and affection for the beloved state of Johor, and with the words Muafakat Membawa Berkat, a pseudonym and expression synonymous with the Johor race, we can realise it, because Malay proverbs say, "the water is round because of the gutter, the people are round because of consensus." Thus, wabillahi taufik walhidayah, assalamualaikum warahmatullahi wabarakatuh. 30 minutes, Mr Speaker.
Thank you, Honourable EXCO Member. I think we do not need a break as usual, because we want to finish straight through by 1.00 pm. If we take a break, we will have to extend the sitting into the afternoon, so we want to go home early, so we will continue without a break. I now invite the Chairman of the Committee on Education, Human Resources, Science and Technology. Please proceed.
Peace be upon you and the mercy and blessings of Allah. Mr Speaker, the Most Honourable Menteri Besar, Honourable Members, I begin my speech by expressing my deepest gratitude for the command of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan of the State and Dependencies of Johor Darul Ta'zim, on the occasion of the opening of the Second Meeting of the 14th State Legislative Assembly (DUN) this year. I would also like to record my millions of thanks to Dato' Osman Sapian, who led the Pakatan Harapan Johor government at the start of its establishment with a forward-looking and visionary foundation. My congratulations to the Most Honourable Dato' Dr. Sahruddin Jamal, who was appointed as the 17th Menteri Besar. We, the EXCO line-up and the State Assemblymen (ADUN), will continue to be committed to supporting and standing with the Most Honourable Dato' Menteri Besar so long as it does not contradict the commands of Allah, His Messenger, the Constitution of Malaysia and the Undang-Undang Tubuh Negeri Johor.
Mr Speaker, on several questions raised by the People's Representatives, Honourable Members present in this House, firstly I will specifically focus my answers on the issue of human resources. Honourable Members present in this House, firstly I will specifically focus the answers on the issue of human resources. The question from the Honourable Member for Kahang asks why the Special Skills Fund for children of FELDA and the Indian community was set aside in the 2019 budget. The answer to this, Mr Speaker, is that in an effort to increase the participation of FELDA children in TVET, the State Education Department (JPN) of Johor has offered skills training through the Upper Secondary Vocational Programme (PVMA), which qualifies students to receive the Malaysian Skills Certificate (SKM) Level 2 at daily schools in FELDA. The FELDA headquarters has also collaborated with Yayasan Peneraju Pendidikan Bumiputera.
Meanwhile, the Indian community is given opportunities through agencies such as Johor Skill, where 15% of children from the Indian community have been accepted as trainees for semi-skilled posts after the Malaysian Certificate of Education (SPM), and about 10% of skilled workers in fields that have received recognition and collaborative certification from international and local professional bodies such as The Welding Institut of UK and others.
Mr Speaker, the statement by the Honourable Member for Kahang is also recorded in the Verbatim through the classification of worker standards in 2108: only 60,000 skilled workers in agriculture, forestry, livestock and fisheries in Johor. For the information of this august House, Mr Speaker, this proves that Pakatan Harapan has produced 60,000 skilled workers in the relevant fields. Thank you to Kahang for stating this achievement. This achievement was made through the training units of Johor Skill, Kolej Yayasan Pelajaran Johor (KYPJ), Kolej Kemahiran Johor, Institut Latihan Perindustrian, ADEX, Pusat Latihan Kemahiran Tinggi and Akademik Minyak dan Gas, which are among the sources that can produce skilled and semi-skilled workers in the state of Johor.
Kahang also mentioned and asked about foreign workers from Africa, where the PH government made a U-turn, he said. In fact, for the information of Mr Speaker and Honourable Members in this august House, the minister concerned holds a view and has not yet brought a proposal paper to the cabinet. Because of the concern of the Prime Minister and the Malaysian Cabinet, who have firmly stated that citizens from Africa are not suited to the environment of Malaysian society, no U-turn arises.
Mr Speaker, answering the questions of the Honourable Members for Layang-Layang, Kahang, Pasir Raja and Endau regarding foreign workers.
The government's policy is to give priority to local citizens to obtain employment first. The government always strives to ensure that citizen workers are not denied their right to work.
The government also imposes strict conditions on employers who wish to hire foreign workers, by requiring them to advertise vacancies on the JobsMalaysia Portal before the Employer Verification Certificate (Sijil Perakuan Pengesahan Majikan) is issued. This approach aims to ensure that priority in filling a position is given first to citizens.
Mr Speaker, among the efforts implemented by the PH Government to reduce dependence on foreign workers and provide employment opportunities to 1 million Malaysians, as in the PH manifesto raised by the Honourable Member for Kahang also, are:
1. Promoting and facilitating job placement opportunities through the Worker Placement Programme (3P) by the Labour Department (Jabatan Tenaga Kerja).
2. Encouraging labour-intensive sectors to shift to the use of mechanisation and automation to reduce dependence on foreign workers. This step can help the country achieve the target of producing 35% skilled workers in Malaysia by 2025.
3. The government's policy is to place emphasis on Industry 4.0, specifically on the development of the manufacturing sector in terms of increasing productivity, innovation and the use of highly skilled manpower, because industries will be generated and driven by robotic and mechanical systems without direct human control.
4. Prioritising an exit policy for the employment of foreign workers by providing skills training plans for citizen workers.
5. Limiting the employment of foreign workers: the government decided that employers throughout Malaysia pay the foreign worker levy from 1 January 2019.
Mr Speaker, answering the question from the Honourable Member for Endau: Foreign workers at restaurant premises and entertainment centres. What action will the police and Immigration (Imigresen) take? I request, through the sitting of the Johor State Legislative Assembly today, that government agencies with an interest in and responsibility for these foreign workers must act whenever there is a report from any party, whether from the public or village heads, let alone reports coming from leaders elected by the people, namely the State Assemblyman (ADUN) or Member of Parliament (MP). Enforcement action is very important for the well-being and peace of the state of Johor and our beloved country, Malaysia.
Mr Speaker, answering the question of the Honourable Member for Tanjung Surat regarding human capital development and skilled worker initiatives for the downstream oil and gas sector in the Penggerang Integrated Petrolium Complex (PIPC) project, particularly by the Johor Petrolium Development Corporation (JPDC).
Firstly, the development of the downstream oil and gas industry at PIPC involves an industrial area of 20,000 acres housing oil storage tanks, oil refinery plants, petrochemical plants and liquefied natural gas plants, as well as related industries. It involves the phased development of the project according to the predetermined phases to ensure that it runs smoothly.
Secondly, manpower requirements will be determined based on the said phases. The total manpower expected for the operation phase is 4,420 skilled and professional workers. The operation phase is expected to begin in the fourth quarter of 2019. The operation phase involves maintenance, repair and refurbishment activities for storage tanks, oil refinery plants, petrochemical plants and liquefied gas plants. Manpower requirements cover the main contractors and sub-contractors appointed by the investors for maintenance, repair and refurbishment activities.
Moreover, one of the six mandates entrusted to JPDC, a federal government agency, is to coordinate, facilitate and promote the development of PIPC, including ensuring that local people in Johor and Pengerang are given the opportunity to take part in PIPC.
To ensure that local citizens are skilled to seize employment opportunities in this operation phase, several proactive measures have been implemented, proactive have been implemented by JPDC:
1. Upgrading of training and up-skilling for existing skilled workers. 2. Training and certification that comply with the requirements of the downstream oil and gas industry in PIPC for local youth. 3. Conducting practical training for the operation phase for graduates in technical fields, to ensure the readiness and employability of graduates from local universities. 4. Training programmes for support services for the operation of PIPC's development. 5. Collaborating with companies and contractors to ensure the placement of workers for local youth.
JPDC also, from time to time, constantly monitors manpower needs for the Pengerang project. Information is obtained from Petronas or the main contractors regarding employment opportunities through the Pengerang Local Information Centre (PISP), village heads, ADUN offices, JobMalaysia, Kembara Kerjaya Johor, and career carnivals. In addition, this information is also shared through social media such as Facebook, Twitter and the JPDC website.
The information provided is not merely about employment opportunities; it also covers oil and gas-related skills training opportunities provided at government-owned training centres. Overall, these benefits can further improve the socio-economic status of the people of Johor, which in turn helps the government achieve the goal of a High-Income Nation as well as a High-Performance Johor, Intelligent Johor Race.
Mr Speaker, answering the questions of the Honourable Members for Layang-Layang and Pasir Raja on how to increase employment opportunities in the State of Johor? In general, based on the economic structure cluster of the state of Johor, in 2018, 47.4% was contributed through the services industry with a Gross Domestic Product (KDNK) value of RM55.8 billion. Meanwhile, 30.74% was contributed by the manufacturing industry with a KDNK value of RM36.2 billion.
Next, the third highest sector is the agricultural industry at 14%, followed by construction, import duties and mining. Meanwhile, in terms of KDNK projections, it will remain at a level of 5.0%, increasing. Accordingly, to increase employment opportunities in the future, the state government will focus on the sectors involved, and this situation will be assisted and stimulated by the rapid growth of the economic corridors in this state, namely the development of the Iskandar Malaysia Economic Region and the Integrated Refinery and Petrochemical Development Project (RAPID) in Pengerang. However, the state government is not only focusing development on the Iskandar Malaysia area; rather, all districts outside that region will be developed according to their own design, suitability, advantages and strengths.
In addition, to boost employment opportunities in this state, there are several sectors that have been identified and explored by the state government through tourism, creative industries, logistics and financial services, diversified enterprises in the region after the electrical and electronics, oil and petroleum, and food and beverage sectors. Likewise, the Pengerang Industrial Park, developed by Johor Corporation, will become the only large-scale industrial area in Pengerang and is expected to attract investment of approximately RM15 billion. So far, more than 10 prospective investors have shown interest in operating there, supporting RAPID Petronas. This will further boost development activities in the Pengerang area.
In fact, the industrial park, which is expected to create 3,600 job opportunities as well as spillover business opportunities for the local community, will help achieve the target of making Johor a hub for oil and gas in the region. PIP covers an area of 316 hectares, located adjacent to the RAPID Petronas site, and will be developed with an inclusive ecosystem to meet the demands of the oil and gas industry, especially the downstream industry. All of the above factors will become catalysts for economic development in the state of Johor, thereby creating thousands of job opportunities for the people of the state of Johor.
Mr Speaker, answering the question of the Honourable Member for Parit Raja regarding employment opportunities for Malaysians working in Singapore. So far, many Malaysians are still seeking employment opportunities overseas, among them in Singapore. With more attractive wage rates, these Malaysian workers are willing to do work in 3D sectors abroad. The loss of human capital with high skills and knowledge due to migration to other countries, brain drain, is one of the trends often experienced in other countries, especially in developing countries.
We are well aware that at the Federal Government level, the Returning Expert Programme (REP) under the management of Talent Corporation Malaysia has been established, which seeks to bring back Malaysians. Among the main sectors contributing to the increase in REP applications, the return of expert citizens mentioned earlier, are business services, manufacturing and construction. At the state government level too, we will take the initiative to hold dialogue sessions with Malaysian workers working in Singapore to obtain a true picture of the situation of their migration abroad. This session is expected to be held at the end of this September.
Mr Speaker, the government has a clear policy, specifically designed to attract sons and daughters of the soil, including Johor children who return to serve and devote their service in their home state, especially within the Iskandar Malaysia Economic Development Region and RAPID Pengerang. Among these policies is the provision of an individual income incentive of 15%. This incentive is offered to those who serve in six promoted service sectors, in addition to the biotechnology and environmental sectors, which are offered to human capital among experienced expert personnel abroad as an opportunity to return and serve in Iskandar Malaysia. For information, this incentive is subject to approval conditions. Therefore, for the benefit of such good policy, efforts continue to be undertaken by the government and related agencies, including the Iskandar Regional Development Authority (IRDA), to strengthen and streamline integrated efforts to attract more high-value investors who can offer high-income salaries, thereby also enabling the return of human capital from sons and daughters of the soil, especially among the people of Johor, to return and serve in their home state of origin.
In addition to the employment opportunities offered through programmes such as the Career Carnival organised by the Human Capital Unit (Unit SMI), as well as other departments such as the Johor State Labour Department, the participation of this combined group through the skills certification programme organised by the Human Capital Unit (Unit SMI) is greatly welcomed. With this skills certificate, they can use it to obtain better employment and earn good wages.
Mr Speaker, answering the questions of the Honourable Members for Parit Raja and Kemelah regarding the role of the Human Capital Unit. The Human Capital Unit, which is responsible for playing an important role in developing human capital in the state of Johor. Various initiatives and activities have been implemented since the establishment of this unit. In ensuring the broadening of the spectrum of the role of Unit SMI as a Johor Government department that coordinates human capital development among the people of Johor, this year Unit SMI will hold the Penasihat Kerjaya Insan Johor programme. This programme is a state-level pilot project whose objective is to develop a competent career guidance group among the people of Johor as a reference source for human capital among job seekers, school students and the general public, to obtain advisory services and the career directions they dream of becoming reality.
Furthermore, through the Malaysian Skills Certification programme using the Recognition of Prior Achievement method, the target group of this programme is those with a minimum of two years of work experience in any field. The courses in this open field are based on NOSS, or the National Occupational Skills Standard. There are more than 1,800 fields offered under the National Occupational Skills Standard.
The next initiative targets the 4B group among youth, single mothers, persons with disabilities and women, such as the Program Insan Johor. This year, the main focus of Unit SMI is directed towards improving skills among the people. Emphasis on programmes in the form of employability courses and personal development courses is also given emphasis. The term human capital is a term that describes people viewed as labour and entrepreneurs, capital or energy assets that are very important and meaningful to economic activities and national development, including the needs of race and religion. This capital is what is drilled, developed and tested for its capability before being utilised.
The Pakatan Harapan Government has a clear goal: without quality, people of integrity, trustworthy human resources and a vision for the future of the people, a nation will be weak, because of the absence of the human factor that triggers new initiatives in socio-economic activities, the spiritual development of the people and their leaders.
Therefore, in strengthening human capital development in the state of Johor and ensuring its sustainability, through the Human Capital Unit (Unit SMI), strategic focus and direction for human capital development have been set:
1. Strengthening the capacity of Unit SMI as a coordinating body for each related agency and the fields related to research and information. 2. Collecting information and creating 200,000 quality job opportunities as stated in the Pakatan Harapan Government manifesto. 3. Reducing employers' dependence on foreign workers in the employment sector in the state of Johor. 4. Strengthening public-private partnership in the Johor human capital development agenda. 5. Structuring and coordinating skills development by agencies and training centres in the state of Johor. 6. Awareness campaign on the enforcement of existing related acts such as the Employment Act 1955, the Occupational Safety and Health Act 1994, the Human Resources Development Berhad Act 2001, as well as a harmonious work culture.
Mr Speaker, therefore, in realising the objectives of this matter, the actions currently being intensified are the activities of collecting information and data that will lead to the creation of potential and high-quality job opportunities. This is important because it can provide a push factor to the labour market in terms of increases in allowances, salaries, benefit packages and rewards to workers. Therefore, it is very important for this unit to prepare an information system or database that will coordinate existing data to be used as a main reference.
For the information of Members of the House, Unit SMI has held several rounds of discussions towards preparing an information system and SMI website for reference by investors, government agencies, industry and the general public.
Mr Speaker, when the government has prepared young human capital, I am confident and believe that our young people will no longer be too demanding, because surely their demands and expectations will be reasonable and suited to the current lifestyle.
Mr Speaker, answering issues on Education. The Honourable Member for Kahang raised the issue of SJKT Seri Alam and the issue of SJKT Ladang Semberong. However, it was answered with great enthusiasm by my colleague, the EXCO for Unity (EXCO Perpaduan), so I will not answer.
Mr Speaker, the Honourable Member for Machap also raised the problems faced by SMK Machap and SK Machap with the stench of chicken dung and fly nuisance. I suggest that the school make a complaint to the relevant departments such as the Simpang Renggam Local Authority (PBT), the Agriculture, Health and Veterinary Departments, for reference and action by the agencies concerned.
Mr Speaker, answering the question raised by the Honourable Member for Mengkibol regarding the Financial Statement of Yayasan Pelajaran Johor (YPJ) concerning tax allocation for the years 2010 to 2017. Yayasan Pelajaran Johor (YPJ) is a statutory body of the Johor State Government established to take on the responsibility of managing educational affairs for the people of Johor. Various educational assistance has been provided to ensure that the people of Johor have higher education and are sustainable and viable in the human capital development of the state of Johor. Regarding tax, YPJ has no business revenue. The source of revenue obtained is from the contributions of YPJ's subsidiary, YPJ Holdings Sdn. Bhd., to fund educational assistance such as education loans, tuition, student hope incentives and also scholarships. In connection with this, YPJ is taking action to contact the Inland Revenue Board of Malaysia (LHDN) for the purpose of clarification and notification regarding this taxation. YPJ is confident that, in its responsibility for educational assistance to the people of Johor, LHDN will consider this application by YPJ.
Mr Speaker, the Honourable Member for Gambir asked about the progress of Universiti Johor and fully supports the establishment of Universiti Johor as in the offer of Pakatan Harapan Johor. For the information of this august House, the study on the establishment of Universiti Johor in Phase 1 involves a study of human resource needs as well as an analysis of competitors' capabilities and gaps, which is being carried out by taking into account the views of stakeholders and also industry players, especially in the state of Johor. Views from the Labour Market Information and Analysis Institute (Institut Maklumat dan Analisa Pasaran Buruh) and the Malaysian Investment Development Authority (Lembaga Pembangunan Pelaburan Malaysia) are also used as a reference to ensure that Universiti Johor is able to strengthen industry and the economy of the state of Johor, through the consolidation of the quality of higher education industry owned by agencies under the Johor government. With the establishment of Universiti Johor, it will also play a role as a strategic partner to industry, the community and the Johor government itself in driving the competitiveness of the people and nurturing future talent.
Mr Speaker, the results of field studies in 10 districts in the state of Johor show high support by the people of Johor for the establishment of Universiti Johor, with an average mean of 3.4/4. The study results also found that 84.4% agreed that the uniqueness and strength of Universiti Johor lies in it being under the administration of the Johor government with the involvement of the community and industry. Meanwhile, the best concepts in governance, financial, academic, physical and industry relations models, and research of Universiti Johor are being studied and refined in Phase 2 of the study to ensure that Universiti Johor can have a transformative impact on society.
Through the right concept of Universiti Johor, the state of Johor is able to develop an excellent human civilisation with high values of consensus, empathy, ethics, integrity, and possessing the value of kareem, namely generosity and nobility. Recently, the state government has been actively drafting and preparing the Strategic Plan for the Establishment of Universiti Johor, taking into account the challenges and implications that Universiti Johor will face.
As we are well aware, the state government is indeed committed to offering competitive opportunities for learning, discovery and engagement that drive economic growth and the social development of society, the state and the nation. The planning of Universiti Johor is also evidence showing that the Johor state government is serious in its efforts to elevate higher learning institutions in Johor so that, God willing, the state of Johor can become a leader in the national higher education institution based on the Quadruple Helix Model through strong collaboration between universities, the state government, industry and the community.
Mr Speaker, the Honourable Member for Semarang touched on my answer regarding 3,992 students skipping school across Johor. It is those who work after school hours, causing students to be unable to wake up in the morning to attend school. This is among the factors of students skipping school, although the percentage is small or isolated cases. I suggest that form teachers, counselling teachers and school administrators identify these groups and try to help through the PIBG (Parent-Teacher Association) and other sources such as NGOs, mosques and others, so that students who work due to financial factors can be helped as best as possible and, indirectly, be prevented from skipping school.
Mr Speaker, in conclusion, it would be extremely unfair if the opposition tried to make a comparison between the BN era, which governed for 60 years, and Pakatan Harapan, which has only governed for one year and two months.
However, with the confidence and prosperity of the people of Johor, who changed the BN government to a PH government, I am confident that all efforts that we are making will continue to receive the support of the people, including throughout Malaysia. The latest evidence of how a very surprising resolution by many parties, between teachers and students, has become a yardstick that all parties, the people, whether members of the public or government employees, greatly value the wisdom of leaders who want to bring the future of the nation in a more advanced, integrous, trustworthy and visionary direction, and who are quick to solve the problems of the people.
Congratulations and thanks to all government employees who continue to be committed to carrying out their duties and responsibilities sincerely and with full dedication, because they realise that the government today is very different from the government of the past. Let us continue to work shoulder to shoulder to develop the state we love, and together continue to maintain unity among us. We reject narrow racial and religious thinking, because that is one of the ways to make Johor a High-Performance Johor, Intelligent Johor Race.
In conclusion, God willing, the PH offer of 200,000 workers, job opportunities in the year, for one term will be realised based on the information in my answer just now, that in this year alone, job opportunities will be filled by more than 91,000. Thank you. Peace be upon you and the mercy and blessings of Allah.
Thank you to the Honourable EXCO member and Chairman of the Committee on Education, Human Resources, Science and Technology. I now invite the Honourable Menteri Besar to deliver the winding-up speech this morning. Please proceed.
Honourable Mr Speaker, Honourable Members, distinguished ladies and gentlemen. Assalamualaikum warahmatullahi wabarakatuh and peace be upon you. I wish to begin by recording my gratitude and deepest appreciation for the royal address of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan and Yang Dipertuan of the State and Dependencies of Johor Darul Takzim, on the occasion of the opening of this sitting of the Johor State Legislative Assembly. Insya-Allah, we will take lessons from the advice that has been conveyed by His Royal Highness Tuanku. Your servant also humbly conveys, with profound gratitude, the consent of His Royal Highness the Sultan of Johor to my appointment as the 17th Menteri Besar of Johor, as well as the conferment of the Darjah Sultan Ibrahim Johor Yang Amat Disanjungi Pangkat Kedua, Dato' Mulia Sultan Ibrahim Johor.
I also extend my thanks to the former Menteri Besar of Johor, the Honourable Member for Kempas, and two former EXCO members from the constituencies of Skudai and Puteri Wangsa. They have helped greatly in the transition of the government and have laid the foundation stone for the more rapid development of the State of Johor. The royal address at the opening of this sitting for the 14th session serves as a good basis for an important debate, all of which is aimed at the interests of the State of Johor and its people.
I also wish to draw the attention of all Honourable Members to our role and responsibilities as leaders. A prominent Malay scholar named Dr. Tenas Effendi, in his book, Kepimpinan Melayu 2013, once stated that to be a leader carries many obligations: to bring the people to well-being; what is tangled must be resolved, what is murky must be made clear. What is crooked must be straightened, what is knobbly must be planed. What is rough must be smoothed, what is wrong must be corrected. A leader must set an example, must impart guidance, must safeguard the homeland, must protect the environment, must side with justice, and must stand upon the truth. Imam Muslim narrated a hadith in the Book of Leadership, in the chapter on the virtue of a just leader, from Ibnu Umar, that the Prophet Muhammad SAW said: "Be aware that each of you is a leader, and each of you will be held accountable for what he leads."
Nevertheless, I feel uneasy because the atmosphere of this debate has been disturbed by offensive words that are not appropriate in this honourable House. There are still vile words that bring no direct benefit to the context of the debate in this honourable House. They are like a kite whose string has snapped, flying without direction and in vain. As Johoreans of high civilisation, we should use polite language in debate in this honourable House. Moreover, Johor was the originator of the promotion of the Malay language as the national language, a language of great beauty and courtesy.
Yang korek itu kendi, yang merah itu saga, yang baik itu budi, yang indah itu bahasa. Bahasa jiwa bangsa.
I hope that all of us can make this debate a foundation for seeking solutions to the problems that have arisen. Mutual respect beyond the differences in our political views. Therefore, as Members of this House who are responsible for carrying out the trust of the people, each of us should use the opportunity in this honourable House to express ideas, solutions and the best decisions for the well-being of the people. Let us appreciate the true philosophy and spirit of democracy as inspired by the Right Honourable Tun Dr. Mahathir Mohamad in Wawasan 2020. Let us practise a way of life like the betel leaves and the lemongrass of one clump, arranged like the sirih leaves. Certainly, we in the state government will endeavour to examine and reconsider all suggestions, criticisms and constructive ideas. As a government that governs, we are always open-minded in receiving all constructive views for the sake of the well-being of the people of Johor.
Honourable Mr Speaker, I begin this winding-up by responding to the matters raised by the Honourable Members from the constituencies of Benut, Layang-Layang and Panti. They are deeply concerned about the direction of the administration of the State of Johor under the Pakatan Harapan government. In fact, since the 14th General Election (PRU), the Johor state government under Pakatan Harapan has been committed to establishing an administrative system that is efficient, effective, professional and of integrity, anchored on the interests and well-being of the people. Therefore, every Committee Chairman entrusted with his respective Portfolio has Key Performance Indicators (KPIs). They will be monitored consistently under the Office of the Deputy State Secretary of Johor, Division of Monitoring and Public Well-being. This is aimed at ensuring that every Committee Chairman carries out his duties and responsibilities in cooperation with the relevant government departments and agencies, in line with the KPIs that have been set. The direction of the Johor state government is through the implementation of the Johor Sustainable Development Plan 2019-2030, High Performance State, Educated Johor People, which was announced by the former Menteri Besar. Nevertheless, the Johor government under my leadership still maintains the development plan with some improvements in terms of the strategic core.
The Johor state government is committed to making the Johor development plan agreed upon by Pakatan Harapan a success. For the information of all Honourable Members, the formulation of this development plan has taken into account various dimensions expected to produce high-impact outputs. Among them are the global sustainability goals that contain 17 criteria. In addition, global and regional economic challenges and competition have also been taken into account in the formulation of this plan. We also take as an example our neighbour Singapore, to be used as a benchmark to drive Johor's economic convergence with global interests. Therefore, the global competitiveness index has been adopted in drafting this plan.
Meanwhile, the formulation of the Johor Sustainable Development Plan, which involves a medium term of 10 years, also takes into account comprehensive elements from previous plans, whether at state, federal or global level. For example, we refer to various Johor development plans, the Mid-Term Review of the Eleventh Malaysia Plan and the formulation plan of the Twelfth Malaysia Plan. The mission of the Johor Sustainable Development Plan is aimed at driving the development of the State of Johor towards a competitive state in a holistic and inclusive manner. The achievements of the Johor Sustainable Development Plan 2019-2030 need to be viewed widely and examined over the long period of development of the State of Johor. We ourselves acknowledge that the development of the State of Johor at present did not come about overnight. Indeed, history shows that Almarhum Sultan Abu Bakar laid a strong foundation for making Johor a state that is advanced, modern and of global standing.
For the information of Honourable Members, the formulation of this development plan is now in its final stage. At present the Johor state government has been and is currently carrying out engagement, with permission, by appointing expert advisers from several universities, namely Universiti Teknologi Malaysia, Universiti Teknologi MARA, Universiti Teknologi Tun Hussein Onn and Universiti Kuala Lumpur. With the synergy between public and private universities, the Johor state government has obtained the views of expert consultants on the true objectives of the various economic indicators that contribute high multiplier effects to the economy of the State of Johor as a whole. Apart from obtaining information from expert consultants, the formulation of this development plan also takes into account the views of the people of the State of Johor. This information gathering was carried out through field studies, findings from social media and findings from online surveys. All of this shows the government's seriousness in strengthening consensus between the state government and the people. The implementation of the Johor Sustainable Development Plan 2019-2030 covers 8 main cores: economic empowerment, social well-being, efficient, integrity-based and democratic governance, the new economy and digital community, the Islamic education system, human capital and Johor heritage, the charm of srikandi (heroines) and the aspirations of young artists, environmental sustainability, public transport and mega infrastructure.
As Menteri Besar, the Johor government will from time to time adopt a planned and systematic strategic approach. We are also committed to working to boost the economy of Johor. Based on the strategic direction, steps and modus operandi, this Johor Sustainable Development Plan is expected to drive a more dynamic, sustainable and holistic development of Johor, with integrated efforts and approaches from all interested parties, including the opposition.
A constructive opposition is one that is not merely adept at criticising and making excuses, but also stands shoulder to shoulder to advance the development of the state. I repeat, a constructive opposition is one that is not merely adept at criticising and making excuses, but also stands shoulder to shoulder to advance the development of the state.
Next, allow me to explain the role of the state government during the environmental pollution incident that occurred in Pasir Gudang. After this pollution incident occurred in Pasir Gudang, this year more and more people have risen up and begun to debate the issue of pollution. Not only from opposition parties, but also from the government side itself. Therefore, I wish to respond to the doubts of the Honourable Members from the constituencies of Permas, Benut, Semarang, Perling and Pasir Raja regarding the supposed many rumours outside that I do not care about the pollution problem that occurred in Pasir Gudang. In fact, the Johor state government has never taken the environmental pollution incident that occurred in Pasir Gudang lightly. Indeed, without any press coverage, I went down to the ground almost every day during the toxic waste pollution incident in the Sungai Kim Kim in March last. Therefore, I wish to explain in this honourable House my commitment and cooperation with the various relevant government agencies to ensure the well-being of the people.
In the case of the Sungai Kim Kim, the state government has allocated an immediate sum of RM6.4 million to carry out cleaning works for toxic waste in that river. In the matter of the air pollution that occurred in Pasir Gudang recently too, I did not dally and did not adopt a hands-off approach. I have instructed all government agencies to take appropriate action to monitor the residents of Pasir Gudang, especially among children.
Next, I wish to address the question raised by Puteri Wangsa regarding monitoring measures that were not thorough enough and the lack of more sophisticated equipment to detect the presence of dangerous gases in the air.
For the information of Honourable Members, I have taken note and have looked closely into everything that has happened in Pasir Gudang during the environmental pollution issue. In connection with this, two committees have been set up to monitor pollution in Pasir Gudang. The establishment of these committees aims to coordinate, monitor and identify the impacts that are likely to occur in Pasir Gudang.
First, the Scientific Technical Working Committee in Pasir Gudang. This committee will coordinate, supervise and detect the impacts that are likely to occur in Pasir Gudang. This committee will also strengthen enforcement activities on illegal factories. For licensed factories, should they be found committing offences and have been given notice twice, the Local Authority will issue an order for the immediate closure of the factory. This committee will also be joined by various technical departments as well as experts from Universiti Teknologi Malaysia.
Second, the Monitoring Committee is set up, consisting of Honourable Members, NGOs, representatives of the PIBG parent-teacher association and PAGEMA, to report the latest status of the level of pollution in Pasir Gudang. Both of these bodies will meet regularly and give reports directly to the Honourable Chairman of the Committee for Local Government, Urban Well-being and the Environment every month. Next, as a long-term step, the state government will draft the Sustainable Pasir Gudang Urban Development Plan. In this plan we will also refine proposals to relocate high-risk chemical factories and create a buffer zone, with permission, between the industrial area and residential areas in Pasir Gudang.
The above steps reflect that the Johor state government is serious in addressing the environmental pollution issue in Pasir Gudang for the long term. The Johor state government also supports six immediate actions presented by the Honourable Ministry of Energy, Science, Technology, Environment and Climate Change (MESTECC) in Parliament recently. Among them are the establishment of automatic toxic pollutant gas monitoring stations, the purchase of mobile gas measuring equipment, and the requirement for industrial premises to install monitoring devices for the discharge of chemical waste.
Thus, I, on behalf of the state government with humility, extend a million thanks to the Federal Government, government agencies and departments, non-governmental organisations, and all parties who have shown high commitment in resolving the pollution problem in Pasir Gudang. To all Honourable Members, let us show sympathy and empathy to the residents of Pasir Gudang. There are times when we may differ in political understanding, but let us unite for the sake of Pasir Gudang. Let us work together to tackle the health problems faced by the residents, especially children in the Pasir Gudang area, which are caused by environmental problems.
In addition, Benut also requested an explanation on the postponement of the Rapid Transit System (RTS) project, with permission, given that all related issues, including land, have been resolved. The postponement of this project is because we gave the government an opportunity to review the related costs. We wish to make decisions based on detailed information grounded in study or fact. Moreover, we do not want waste. However, we demand transparency as the people require. The Government of Malaysia, through the Honourable Minister of Transport, signed a supplementary agreement with the Singapore authorities on 21 May 2019 to postpone the implementation of the RTS Link project for six months, namely from 1 April 2019 until 30 September 2019. This matter has also been explained by the Chairman of the Committee for Public Works, Transport and Infrastructure at the winding-up session dated 4 July 2019.
Next, I wish to refer to the matter raised by Larkin, concerning the government's plan regarding State-Linked Companies or GLCs that do not generate profit and burden the government. For information, the Johor state GLCs have contributed much in economic and social terms to the development of the State of Johor. However, continuous monitoring will be implemented to ensure that the Johor state GLCs remain competitive and are able to further boost economic development in strategic sectors. In connection with this, the Johor state government always places emphasis on strengthening the financial institutions of each GLC. As a step towards improvement, the state government will establish a Special Unit to Analyse and Monitor Investments, including the Johor state GLCs, under the Johor State Treasury. This unit will examine and monitor the financial performance of the GLCs regularly and recommend the best measures to strengthen the financial performance of the GLCs. Indirectly, it will help the state government as a catalytic agent of Johor's development, by upholding social responsibility to the people, including the construction of Rumah Mampu Biaya (affordable housing), educational facilities and the provision of public infrastructure.
Regarding the issue of land premium, I also wish to refer to the speech of Penawar, which was described as reckless and without verified facts. If this matter is viewed rationally, the premium charged for the purpose of extending the lease period of residential houses is very fair and, with permission, fair enough, and it is only a one-time payment for every 60 or 99 years. Put simply, supposing the land is valued at RM50,000.00, the premium charged for the 60-year option is only 15%, which is equivalent to RM7,500.00, and if divided over 60 years it is only RM125.00 for each year. The premium on land for residential house sites at a rate of 15% or 30% of the market price is not a new decision of the government today; rather, it is based on JPU 94, which was gazetted in December 2004 and took effect in January 2005, more than 14 years ago. Let us not be like "throwing a stone and hiding the hand". Therefore, the statement of the Honourable Member for Penawar that the premium rate has risen sharply by as much as 150% is baseless and far removed from the actual facts.
Nevertheless, as a government that understands the pulse of the people, the Pakatan Harapan state government has agreed to grant residential house sites to Generasi Harapan FELDA with a premium of RM1.00 per square foot only. RM1.00 per square foot only. Be assured and believe that the premium stated here is also far lower compared with the infrastructure that will be provided by the government, including roads and drainage in the area. In other words, whatever amount is paid will certainly be returned for the well-being of the people.
Honourable Mr Speaker, Honourable Members. One important issue that has been the subject of debate in this honourable House is the issue of the increase in land tax. I refer to the question concerning the land issue raised by the Honourable Member from the constituencies of Machap, Bukit Pasir and Kempas. For the information of the House, land tax is an annual payment whose rate has been fixed and which must be paid every year. This rate of payment is contained under the State Land Rules. Land tax is considered in arrears when it fails to be settled on or before 31 May of the year concerned. Land revenue is the largest contributor to the total revenue of the State of Johor when compared with other revenues. In 2018, land revenue contributed RM964 million or 62% of the total revenue of the State of Johor. Land tax receipts are among the main contributors to the revenue of the Johor state government. In 2017, land tax receipts contributed RM372.9 million. Meanwhile, in 2018 land tax receipts contributed RM381 million, an increase in the revenue of the Johor state government.
For the information of Bukit Pasir, land tax or rent, based on the terms stated in the National Land Code, is different from the property tax imposed by the Local Authority (PBT). Land tax is imposed on every land that is owned, or in other words, land that has a title; while property tax is a tax imposed on the owner or occupier of a rated holding located within the jurisdiction of the PBT. As has been informed, the Johor state government is in the final stage of the fifth review of the land tax amendment for the years 2020 to 2029. We will try to ensure that it will benefit not only the government in terms of revenue collection, but its effects will also be felt by all levels of society. Insya-Allah.
The review of land tax by the State Authority is appropriate to current economic conditions and in line with the growth of the state's development structure. In addition, it also accords with Section 101 (1) of the National Land Code, which allows the State Authority to carry out periodic reviews in accordance with the provisions subject to subsection (5). Therefore, the purpose of this review of the Johor state land tax rate is to replace the current land tax rate, which has exceeded a period of 10 years. The existing land tax rate was gazetted as in the Johor State Government Gazette J.P.U 95 dated 16 December 2004, which has been in force since 2005 until now.
In line with that provision, the Johor state government commits that the principles adopted for reviewing land tax for the years 2020 to 2029 are as follows:
1. To impose land tax rates that are more suitable and reasonable according to the circumstances, use and area of the land.
2. To ensure property development is aligned with economic growth.
3. To increase revenue receipts for the Johor state government.
4. To determine a reasonable rate of increase that does not burden low-income groups.
5. To encourage the entry of foreign investment and boost the growth of local investment.
I wish to express my thanks for the views given by the Honourable Member for Kempas regarding this review of land tax. Several aspects have been taken into account in this review, which involve not only the agricultural category but also the industrial and building categories. However, the increase imposed is still at a reasonable rate in keeping with current economic conditions. This is because we still take into account small farmers with small-scale holdings, who are charged a lower land tax compared with those who have land holdings of tens or even hundreds of hectares. I would also like to state here that the land tax cost in the State of Johor is very small compared with the production costs of other crops. I give the example of pineapple cultivation, in which Johor is among the main pineapple-producing states in Malaysia. Just imagine, one hectare of land can be planted with around 30,000 plants and the harvest is obtained in a period of around 14 months per cycle. The current selling price of pineapples is RM1.00 to RM4.00 per kilogram, so the sales revenue from pineapples can reach between RM30,000.00 and RM120,000.00 per cycle for each hectare of land. However, the tax rate for pineapple cultivation is only RM10.00 per hectare. This situation shows that the rate charged is very affordable and reasonable.
Through this review of land tax, we will also be fairer, especially to small farmers who cultivate land of less than 10 acres. For oil palm cultivation, for example, the tax rate imposed on landowners who own land of 10 acres and 90 acres is the same, namely RM40.00 per hectare. Whereas in this review we will draft a smaller range to ensure that the land tax amendment to be implemented later does not burden small farmers, especially the B40. Instead, the land tax increase is focused on large-sized land.
Although the action taken by this state government seems unpopular and gives room to Honourable Members from the Opposition to attack the government, we are confident that the people will be able to assess that this review of land tax does not in any way affect the people, especially the B40 group. Insya-Allah. Moreover, the increase in state revenue resulting from the new tax will in future be used wisely for the benefit and well-being of the people. I also note that the Honourable Member for Machap, in his debate speech, also raised this issue of the land tax review that I explained during the oral question session last week. If the Honourable Member paid attention to that statement, I also emphasised efforts to generate new revenue, as well as efforts towards maximising sustainable land revenue income and carrying out expenditure prudently. The review of the implementation of the land tax amendment had begun to be carried out by the Barisan Nasional government. However, at that time, it was not implemented because of the 14th General Election (PRU). Therefore, in my opinion, based on the various considerations stated, this tax amendment should not be politicised and exaggerated as if it were very burdensome to the people.
I wish to respond to the challenge by Benut, which states that the Menteri Besar should accompany the Chairman of the Committee for International Trade, Investment and Utilities abroad to attract more investors to invest in the State of Johor. I hope that Benut, or any opposition representative, does not feel worried and uneasy about who goes abroad to attract investors. This is because I and the EXCO team understand our respective work and responsibilities. I constantly monitor the output of my EXCO team. I am also confident in the ability and competence of each EXCO member. Indeed, almost every week I receive information from each EXCO portfolio in the State Executive Council Meeting. Therefore, the opposition need not worry about the capability of my EXCO team. We work as one team, take action together, make decisions together and take responsibility together. We are realising the command of DYMM Tuanku, Muafakat Itu Berkat (Consensus Brings Blessings). What is important to me is the total amount of investment successfully brought in by my EXCO for the prosperity of the state and the well-being of the people of Johor.
Then arises a question: what need do we have to go abroad in large numbers to attract foreign investors? Will that not add a much greater cost abroad? I am of the view that it is not necessary for a government to do so in the current economic situation of our country. Clearly, we want to curb the leakage of the people's money. At the same time, the State of Johor is very fortunate because whenever the Malaysian delegation makes overseas visits, the name of the Johor representative is never left out. The Ministry of International Trade and Industry (MITI) believes in the capability and potential of Johor in various economic projects that are competitive and viable. Indeed, Johor's location close to Singapore gives an economic advantage to Johor.
I also reject Machap's allegation that investor confidence to invest in Johor has declined. The facts are that in 2018 the GDP of the State of Johor was projected to grow at a rate of 5%, which is higher than the national rate of 4.7%. Investor confidence in the economic environment and ecosystem of Johor has proven solid, with the highest annual investment inflow in Malaysia for the sixth consecutive time, namely RM30.5 billion. In addition, the prospects for Johor's economic growth in 2019 are positive, with growth expected at a rate of 5% to 5.5%. Therefore, the opposition should not be overly worried about the planning and the amount of foreign investors entering Johor. The Investment EXCO, together with the federal government investment agencies such as MIDA and state government agencies through JSIC, the GLCs and Johor government departments, have redoubled efforts to attract more companies from within and outside the country to invest in the State of Johor.
Next, I refer to the debates of Buluh Kasap and Puteri Wangsa regarding the Pakatan Harapan government's promise to provide laptop incentives to all village heads. The state government is deeply concerned about the need for village heads to carry out their duties properly. The provision of these laptops is not only given to village heads, but the state government has agreed to extend the benefit to community leaders. Therefore, with the provision of these laptops it is hoped that village heads and community leaders can demonstrate excellent work performance by providing the best service to the local community, and thereby dispel the slander from opposition representatives concerning the performance of village heads in the State of Johor.
Next, I fully support the aspiration of Gambir to establish a Shared Prosperity Policy for the well-being of the state and the people of the State of Johor. Gambir is an experienced, perceptive and far-sighted person in developing Johor. Gambir has also made a great contribution in transforming Johor into an advanced and modern state. Therefore, the proposal to establish a Shared Prosperity Policy through eight main cores will be given special emphasis by the Office of the Deputy State Secretary of Johor (Development) together with the various relevant agencies. This Shared Prosperity Policy will be an important agenda in the development plan of the Twelfth Malaysia Plan. This policy will encompass three main aspects that are the aspirations of the Pakatan Harapan government, namely economic empowerment, environmental sustainability, and the nurturing of social and humanitarian fields. The Pakatan Harapan government is committed to and takes seriously all three aspects that are given emphasis. This is because social well-being and the fruits of fair and equitable development will only be enjoyed by the majority of the people through a balanced and targeted distribution from a government that has integrity and is prudent. We in the Johor government fully support this proposal and will realise it as soon as the RMK-12 is launched. This policy is indirectly expected to reduce social inequality among the multiracial people, between states and between regions, and to strengthen the cohesion and unity of the people in the long term.
Next, I wish to refer to the speech of Benut which touched on the issue of the write-off of Johor's water debt, providing a lengthy explanation. For the information of Honourable Members, on 20 April 1999, the Johor state government signed a privatisation agreement for raw water treatment and the distribution of treated water for the whole State of Johor for 30 years. The agreement was made with a company established by Lambang Optima Sdn. Bhd. (LOSB), namely SAJ Holdings Sdn. Bhd., now known as Ranhill SAJ Sdn. Bhd. (RSAJ). In 2005, matters relating to water services were transferred from the State List to the Concurrent List in the Federal Constitution, and the Water Services Industry Act 2006 (Act 655) was gazetted in 2006. This resulted in the regulation of raw water remaining with the state government, while the regulation of treated water was transferred to the federal government through the National Water Services Commission (SPAN). In connection with this, the Johor state government, the federal government, Syarikat Air Johor Sdn. Bhd, Ranhill Utilities Berhad and Pengurusan Aset Air Berhad signed a Master Agreement on 11 March 2009 for the purpose of migrating the Johor water supply industry to regulation under SPAN.
In 2010, the outstanding debt of the Johor State Government Water Supply Project owed to the federal government amounted to RM1.208 billion. All of the outstanding debt of the Johor State Water Supply Project should have been taken over by Pengurusan Aset Air Berhad (PAAB) through the Water Supply Migration Process. In 2011, only RM873.7 million out of RM1.208 billion was transferred to Pengurusan Aset Air Berhad (PAAB) as per the agreement dated 21 June 2011. This resulted in an outstanding debt of RM334.5 million remaining borne by the Johor state government. It is well known that the outstanding debt of the Johor State Water Supply Project of RM334.5 million is a loan sourced from the Asian Development Bank and the World Bank. The Johor state government has on many occasions applied to the federal government for the outstanding debt of RM334.5 million to be converted into a grant to the state government. However, until March 2018, the federal government through the Ministry of Finance Malaysia stated that the application by the Johor state government that the loans for the water supply project financed through the Asian Development Bank and the World Bank, amounting in total to RM334.5 million, be converted into a grant could not be considered because the loans were intended to implement the urban water supply project. Within the outstanding debt of RM334.5 million, there are actually breakdowns of loans for the Rural Water Supply Project and the Urban Water Supply Project. In connection with this, the Johor state government continued its efforts and submitted the application and justification to the federal government.
Therefore, a meeting was held at the Ministry of Finance Malaysia in September 2018, which decided that RM189.4 million be written off and RM145.1 million be transferred to Pengurusan Aset Air Berhad (PAAB). For information, federal government policy only writes off the loans for the Rural Water Supply Project and does not include the Urban Water Supply Project. Finally, in May 2019, the Ministry of Finance Malaysia issued a letter of approval to write off the federal government's loans to the Johor State Government for the Rural Water Supply Project based on the outstanding loan balance as at 31 December 2018 amounting to RM189.4 million.
Next, I wish to refer to the speech of Senggarang which touched on the state government's efforts in implementing the policy of exploring alternative water resources. For information, this issue has already been answered by the Chairman of the Committee for International Trade, Investment and Utilities at the previous winding-up session. Nevertheless, as the head of the state government administration, I am responsible for stating the serious position of the state government in efforts to explore various alternative water resources. At present, the State of Johor only utilises 1% of underground water resources. However, we have not remained silent and several proactive steps have already been implemented. The state government has built 3 tube wells, tube wells with a capacity of nearly 1 MLD, built near the Lok Heng Water Treatment Plant. These tube wells will act as an alternative water source should there be pollution or a decline in river water levels. In addition, the state government is always alert to new plans for these alternative water sources. For information, the state government, through the Johor Water Regulatory Body, also has plans to conduct underground water studies throughout the entire State of Johor. The exploration of these alternative water sources will be carried out in stages.
First, ground water mapping works, with permission, for the exploration of these alternative water sources will be carried out first in order to identify potential areas. Second, the state government is of the view that rainwater can be utilised as one of the alternative water sources, where rainwater harvesting can be processed and stored in plants and dams. This step can also be used for commercial purposes. Third, the state government will consider the treatment of sea water through desalination technology as an alternative source to meet the increasing needs for the long-term planning period. In addition, I wish to advise all the people of Johor to change their attitude towards using water wisely. Indeed, I hope that the government and the private sector can provide support in instilling various initiatives for the economical use of water in daily life.
Among the efforts that can be implemented under demand management is through the use of water-saving technology. For example, taps that do not release water forcefully. Let us reflect on the words of Allah SWT through the sacred verse of the Quran quoted from surah al-Nahl, verse 10, the meaning of which is: "It is He who sends down rain from the sky for you; from it is drink, and from it is [vegetation] by which you graze your livestock." May we all be grateful for the blessings that Allah has given and use water wisely and prudently.
Before concluding my winding-up speech, I wish to express my highest appreciation and thanks to all Honourable Members who have given their full support to my leadership in running the administration of the Johor state government. I, together with the EXCO and the civil servants of Johor, am committed to continuing to strive to provide the best service for the people and the State of Johor that we love. It is here that we all pledge undivided loyalty to continue the survival of a state that is advanced, modern and progressive. I wish to remind the sitting of this House about a folk tale that is very significant in the context of this House. Remember that the slowness of the tortoise once defeated the arrogant hare, all because of negligence and greed. The significance is that we should discard negative mazmumah traits, and instead let us cultivate positive mahmudah qualities to strengthen the consensus of the Johor people. I always remind the entire machinery of government that the Johor state government will act based on strategic planning carried out carefully and collectively. We stand on real ground. I acknowledge that our presence here is by the mandate and trust of the people.
The people have placed great hope in us to establish a better, more transparent and more accountable system of governance. I acknowledge that every action we take is judged by the people, and the people are now increasingly clever in accessing information from various sources. Political literacy among the people is also increasingly high. Therefore, we take the stance that although the steps being set in motion may appear slow, they are full of courtesy, decency and ethics. I always remind the entire machinery of government to act with measured management, without rushing in managing and administering the state. Moreover, our friends on the other side constantly apply pressure and put forward various allegations based on perception. However, I take an open stance, the practice of democracy in the name of freedom of expression. What is important is cooperation and the ability for us to focus on what we plan strategically and implement based on clear goals and set targets. In my view, there is no point in us walking fast, puffing out our chests, being vain and arrogant, prioritising our own political interests and positions, and the tendency to fill the stomachs of political friends, which in the end burdens the well-being of the people, especially the Johor race.
From Johor wandering to Perlis, dipping into pockets up to the calves, the people's trust is entirely eroded, in truth a tarnished party will surely be rejected.
I wish to emphasise that the current plan of the Pakatan Harapan government is of a friendly, peaceful and collective nature towards social well-being, economic prosperity and environmental sustainability. All our actions in the Pakatan Harapan government are for the sake of religion, race and the beloved homeland. Insya-Allah, remember all Members of the House: here we were born, here we receive many blessings, and here we will end a life, insya-Allah. I also hope and pray that whatever ideas, concepts, plans, actions and strategies that we have, are doing and will do, are solely for the people of Johor. However, we must be rooted in the sacred human phase, namely rahmatan lil alamin (a mercy to all the worlds), so that all our sincere efforts to empower and bring well-being to the lives of the people succeed.
Honourable and esteemed sitting of this House, I wish to remind everyone that the victory of Pakatan Harapan in the 14th General Election (PRU) is at the same time the holding of the trust to administer the nation and the state with a new political direction that is more democratic, of integrity and full of responsibility. All parties are well aware that the Pakatan Harapan government is only a year old. It is unfair to keep pointing fingers, placing the full blame for failures and inefficiency of governance only within such a short period. It is unfair to judge the capability and development in such a very short period. In truth, all the chaos and the decline in development that has occurred all this time is rooted in the previous government's administration. In fact, we are repairing all the damage so that the entire machinery of government can be focused on the development of the people and the continuous progress of the state.
According to a historian named Prof. E.H. Carr, history is the relationship between the past and the present. History is not something that is a missing link, with permission, between what has happened in the past and what is happening in the present. Therefore, history records episodes throughout the ages. So, our friends on the other side, do not point one finger at us, but consider the four fingers pointing back at yourselves. As I stated at the beginning of my speech, I wish to remind everyone of this responsibility as leaders, all the more so since we became leaders or representatives of the people by the choice of the people. Therefore, our obligation is to the people, and even more so to the Creator. Let us correct our intentions, let us restore our idealism, let us stand shoulder to shoulder, let us agree together for the sake of the people, let us rack our minds, let us use our strength, let us strengthen consensus, let us unite. We may differ in political understanding and we may differ in opinion. But our political resolve is one, namely to prosper and bring well-being to the lives of the people. Therefore, we can synergise all our strength, unity of thought and unity of action for the sake of our beloved religion, race and state. Remember, there is nothing that brings more happiness to a leader than seeing the people he leads living in a state of peace, prosperity, happiness and well-being.
That concludes my speech. May Johor continue to be advanced, modern and progressive under the leadership of Pakatan Harapan, which receives continued patronage under the leadership of the Johor sultanate. I end my speech with the sacred words recorded in the Johor State Constitution of 1895, namely: "Submit to Allah and consensus brings blessings." That concludes my winding-up speech. I will continue to work and serve the people. Wabillahi taufik walhidayah. Assalamualaikum warahmatullahi wabarakatuh. Peace be upon you and thank you.
Waalaikumussalam warahmatullahi wabarakatuh. Thank you to the Most Honourable Menteri Besar, who wound up at such length this afternoon.
The motion before this House is that the following address of thanks be presented to His Majesty the Sultan of Johor:
"Humbly, Your Majesty, we, the Speaker and Members of the Johor State Legislative Assembly sitting today, resolve to offer our most profound gratitude for the gracious consent of His Majesty the Sultan of Johor in attending this honourable House and commanding the opening of the Second Session of the 14th Johor State Legislative Assembly."
The motion is put for decision. Those in favour, please raise your hands. Those against. The motion is carried.
Clerk : Discussion on the Appointment of the Chairman of the Public Accounts Committee.
Mr Speaker, I beg to move the motion that this House resolves, in accordance with Standing Order 110(3), the Standing Rules and Orders of the State Legislative Assembly for the Appointment of the Chairman of the Johor State Public Accounts Committee, to replace the Honourable Tuan Tan Chen Choon, who has been appointed Chairman of the Committee on Local Government, Urban Wellbeing and Environment. Accordingly, it is proposed that the Honourable Tuan Tan Hong Pin be appointed as the new Chairman of the Public Accounts Committee.
Mr Speaker, I second the motion.
The motion is put for decision. Those in favour, please raise your hands. Those against. The motion is carried.
Clerk : First Supplementary Development Estimates 2019
Mr Speaker, I beg to move that this House immediately resolve itself into a Committee of the Whole State Assembly to consider the First Supplementary Development Estimates for 2019, tabled as Meeting Paper No. 22 of 2019, and to report whether those estimates should be approved by this House with or without amendment.
This supplementary development allocation is the first supplementary allocation for 2019. The additional development allocation required is RM8 million under one committee as follows:
Committee on Natural Resources, Administration, Finance, Planning and Economic Development of Johor, RM8 million. Further explanation of these additions will be given at the relevant Committee stage.
Mr Speaker, I second the motion.
The motion is put for decision. Those in favour, please raise your hands. Those against. The motion is carried.
The House sits as a Committee.
The question before this Committee is that the sum of RM8,000,000.00 for Head of Expenditure P.70, Office of the Menteri Besar of Johor, be agreed to. Agreed.
Mr Chairman, for Development Purpose P.70, the Office of the Menteri Besar of Johor requires an additional allocation of RM8 million to cover land acquisition projects (PBT) for 2018 and priority projects for 2019 that require immediate implementation to guarantee the welfare and safety of the people.
The question is put for decision. Those in favour, please raise your hands. Those against. The question is agreed to.
Mr Chairman, since the purposes of the estimates stated in Meeting Paper No. 22 of 2019 have now been fully considered, I move that the resolutions of the Committee be reported immediately to the State Assembly.
The question is put for decision. Those in favour, please raise your hands. Those against. The question is agreed to.
The State Assembly resumes.
Mr Speaker, I beg to inform the House that this Committee of the House has considered and approved, without amendment, the purposes of the estimates stated in Meeting Paper No. 22 of 2019. I therefore move that this House agree that the sum of RM8 million proposed for the First Supplementary Development Estimates for 2019 be approved by this House.
And I hereby resolve that a sum not exceeding RM8 million be expended from the Development Fund in the Financial Year 2019 to carry out the purposes stated in the said meeting paper.
Mr Speaker, I second the motion.
The motion is put for decision. Those in favour, please raise your hands. Those against. The motion is carried.
Clerk : Supplementary Supply Enactment 2019 BillBill
Mr Speaker, I beg to move that the Bill entitled the Supplementary Supply Enactment 2019 be read a first time.
Mr Speaker, I second the motion.
This Bill is read a first time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure on services for the year 2019, and to appropriate that money for specific purposes.
Mr Speaker, I beg to inform the House that I will move the second reading of this Bill today as well. I also move that Standing Order 112(2) be suspended temporarily so that consideration of this Bill at its other stages can be completed today as well.
Mr Speaker, I second the motion.
The motion is put for decision. Those in favour, please raise your hands. Those against. Standing Order 112(2) is suspended temporarily.
Mr Speaker, I beg to move that this Bill be read a second time now.
This additional allocation is the first supplementary allocation for the 2019 Supply Expenditure. The additional allocation required is RM20,941,000.00, as provided for in the Supplementary Supply Enactment, under one committee as follows:
Committee on Natural Resources, Administration, Finance, Planning and Economic Development of Johor, RM20,941,000.00. Further explanation of these additions will be given at the relevant Committee stage.
Mr Speaker, I second the motion.
The question before this House is that this Bill be read a second time now. Those in favour, please raise your hands. Those against. This Bill is read a second time.
An Enactment to authorise the use of a sum of money from the Consolidated Fund for additional expenditure on services for the year 2019, and to appropriate that money for specific purposes.
The House sits as a Committee.
JADUAL.
The question before this Committee is that the sum of RM355,000.00 for Head of Expenditure B.03, State Assembly; RM275,000.00 for Head of Expenditure B.03, Sultan Ibrahim Camp; RM311,000.00 for Head of Expenditure B.26, Abu Bakar Royal Museum, Istana Besar Johor; and RM20,000,000.00 for Head of Expenditure B.28, Contribution to Statutory Funds, form part of the Schedule to this Bill.
Mr Chairman, under Supply Purpose B.03, the State Assembly is allocated RM355,000.00 to cover the emoluments of the Department. Under Supply Purpose B.03, Sultan Ibrahim Camp is allocated RM257,000.00 to cover expenditure on professional and other purchased services and departmental hospitality. Under Supply Purpose B.26, Abu Bakar Royal Museum, Istana Johor, is allocated RM311,000.00 to cover departmental services and supplies expenditure. Under Supply Purpose B.28, Contribution to Statutory Funds, RM20 million is allocated for contribution to the Housing Loan Fund to process housing loan applications.
The question is put for decision. Those in favour, please raise your hands. Those against. The question is agreed to. The Schedule forms part of this Bill.
FASAL 2.
The question before this Committee is that Clause 2 form part of this Bill. Those in favour, please raise your hands. Those against. Clause 2 forms part of this Bill.
First Clause.
The question before this Committee is that the First Clause form part of this Bill. Those in favour, please raise your hands. Those against. The First Clause forms part of this Bill.
The State Assembly resumes.
Mr Speaker, I beg to inform the House that this Bill has been considered in Committee of the Whole, clause by clause, and agreed to without amendment. I therefore move that this Bill be read a third time and passed now.
Mr Speaker, I second the motion.
The question before this House is that the Bill entitled the Supplementary Supply Enactment 2019 be read a third time and passed now. The question is put for decision. Those in favour, please raise your hands. Those against. This Bill is read a third time and passed.
Be it hereby enacted by the Johor State Legislative Assembly as follows: This Enactment may be cited as the Supplementary Supply Enactment 2019.
Mr Speaker, I beg to move that this House be adjourned.
Mr Speaker, I second the motion.
Praise be to God, our Sitting is nearly at its end. I take this opportunity to seek forgiveness for any mistakes, errors, and lapses during my conduct of this Sitting. Before I adjourn this Sitting, all Honourable Members, Heads of Department and everyone present are invited to lunch at the Banquet Hall shortly.
Honourable Members, this House is adjourned to a date to be fixed. That is all. Wabillahi taufik walhidayah. Assalamualaikum warahmatullahi wabarakatuh.
The Sitting was adjourned at 1.06 p.m.
Duty Officers:
Hansard Writer: Mrs Shubanah binti Yusuf, SIJ., PIS.
Assistant Hansard Writers: Mr Hasnul Atmam bin Othman; Mrs Farrah Diana binti Mohammad
Head of House Unit: Mrs Asiah binti Moklis
Publication Assistants: Mrs Malina binti Mohd Nasir; Mrs Noraisah binti Mohd Yusof; Mr Ariff bin Abu Bakar
Operations Assistants (Bentara): Mr Razine bin Sulaiman; Mr Hamdan bin Markom; Mr Norhayadi bin Hussien; Mr Muhamad Khirunizam bin Pahmi; Mr Mohd Norazri bin Kasim; Mr Mohd Sapri bin Manan; Mr Muhamad Khairul Asyraf bin Abdullah; Mr Muhammad Khairul bin Arop
Office Secretaries (House Reporters): Mrs Azlin binti Bahrin; Mrs Rumiah binti Sumirono; Mrs Saniah binti Kassim; Mrs Junaidah binti Paing; Mrs Zahiti binti Muhamad Hamdi; Mrs Nor Dalilah binti Dahlan; Mrs Fareza binti Musa; Mrs Siti Rojimah binti Abd. Razak; Mrs Shuriati binti Abdul Hajar; Mrs Norlydialina binti Ithnain; Mrs Norhafizah binti Osman; Mrs Raihanah binti Ismail
Recording: Mr Azizan bin Md. Sidi; Mr Khairul Annuar bin Umar Usman
Audio-Video Technicians: Mr Noorazhan bin Mohd Salleh; Mr Ismail bin Abu Bakar
HOUSE UNIT, OFFICE OF THE HANSARD WRITER, JOHOR STATE LEGISLATIVE ASSEMBLY, 29 August 2019