Johor · 7 September 2021

4th session, 1st meeting · 101 turns · 23,747 words · official PDF ↗

99 of 101 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalJohor publishes one PDF per meeting, months late. Speakers are matched by our parser and will have some errors. The 16th Assembly’s first sitting (27 Aug 2026) is a scan with no text yet.

Announcement from the Honourable Mr Speaker.

SpeakerEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, good morning and greetings of peace. (Recitation of selawat). Honourable Members, today we continue the First Meeting of the Fourth Session of the Fourteenth Johor State Legislative Assembly, the fifth day.

Honourable Bukit Naning, please.

Tuan Md. Ysahruddin bin KusniPKR · PHBukit NaningEN

Honourable Member, Mr Speaker, question number 1.

What assistance has been provided, and how many recipients have received assistance, by the Johor Islamic Religious Council (Majlis Agama Islam Negeri Johor, MAIJ) during the implementation of the First Phase of the PPN (National Recovery Plan)?

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

Bismillahirrahmanirrahim. (Recitation of selawat). Assalamualaikum warahmatullahitaala wabarakatuh. Honourable Member, Mr Speaker, in answer to the question from Bukit Naning, during the period of the First Phase of the PPN, namely the National Recovery Plan, the Johor Islamic Religious Council (MAIJ) has allocated a total of RM3 million for the purpose of food basket (Bakul Makanan) assistance for those whose income has been affected during this PKP 3.0 period.

This assistance is distributed through the MAIJ district offices and also through the zakat distribution Amils in every mukim. To facilitate the general public in applying for this assistance, MAIJ has also provided a hotline at the headquarters level, and subsequently the action for this assistance will be implemented at the district level of the Johor Islamic Religious Council.

For the information of the Honourable Member Mr Speaker and the House, up to 31 August 2021, a total of 7,345 food baskets have been distributed throughout the state of Johor. To further expand this zakat distribution, to help those who have been affected and cut off from food supplies during this PKP 3.0, MAIJ has also approved a special allocation of RM3.53 million to be distributed as follows:

Firstly, a contribution of RM1.6 million has been distributed to 341 Gerobok Rezeki located at mosques and surau throughout the state of Johor, for the information of Honourable Speaker and also the Members of the House, where each location is allocated RM5,000.00.

The number of mosques and surau involved in making the Gerobok Rezeki Programme a success during the National Recovery Plan Phase 1 is as follows:

Johor Bahru district: mosques, 25; surau, 23; Batu Pahat: mosques, 41; surau, 18; for Muar district, mosques, 28; surau, 29; for Segamat district, mosques 26, surau 6; for Kluang district, mosques 16, surau 14; for Kota Tinggi district, mosques 32, surau 6; for Pontian district, mosques 15, surau 6; for Tangkak district, mosques 12, surau 6; for Kulai district, mosques 14, surau 15; for Mersing district, mosques 5, surau 4; total mosques 214 and total surau 127.

Next, Honourable Mr Speaker and also the Members of the House, a financial contribution of RM1.6 million has been distributed to the affected mosques and surau in the state of Johor to help them maintain the affected mosques and surau, especially to meet the cost of utility bills. Next, a contribution of RM230,000.00 has been distributed to every district office throughout the state of Johor for the purpose of Gerobok Rezeki. This contribution is carried out every day and MAIJ is committed to helping the communities affected by this PKP 3.0, with a total of RM50,000.00 for the Johor Bahru district and RM20,000.00 for each of the other districts.

The breakdown of food assistance through the hotline is as follows:

Johor Bahru, 2,601; Muar, 889; Batu Pahat, 885; Segamat, 393; Kluang, 543; Kota Tinggi, 700; Pontian, 300; Mersing, 134; Tangkak, 360; Kulai, 500; overall total 7,345.

The Council has also approved donations to victims of the storm in Sedili in conjunction with, during this PKP period, Honourable Mr Speaker. A one-off payment of RM300.00 to 367 families with a total overall amount of RM110,000.00. Rental payment of RM350.00 for a period of 6 months to 4 families with a total overall amount of RM8,400.00. Honourable Speaker, that is all.

SpeakerEN

Yes, Bukit Naning, please.

Tuan Md. Ysahruddin bin KusniPKR · PHBukit NaningEN

Thank you Honourable Mr Speaker, thank you for the answer given by Honourable EXCO. Just now we have heard about the assistance from MAIJ. If we listen, there are many mosques receiving food basket supplies in the form of Gerobok Rezeki. Can we obtain the list from you, Honourable? The list of names of the mosques. There are 28 mosques in Muar and 29 surau, we also want to know which ones received them. Then Honourable Mr Speaker, my question is, how does MAIJ identify the recipients of this contribution through the Village Heads or representatives appointed by MAIJ? Thank you Honourable Mr Speaker.

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

Honourable Mr Speaker, I am only providing for the total of the district-level matters. And, I promise in this House, we will send a report to every State Assemblyman, the total list of mosques and surau that receive this assistance. As for the second matter, how MAIJ identifies, when this application is extended to the hotline, our officers will go down to the field within one day. This is after I promised the esteemed House previously, on the method for MAIJ to quickly approve these assistance applications. In the period since the hotline was launched on 25 July, Honourable Mr Speaker and also the Members of the House, we have worked through the Village Heads and the Amils in every mukim. Through the Village Heads and the Amils in every mukim, we obtain detailed information on the problems of the applicants who have applied to MAIJ. That is all, Honourable Mr Speaker.

SpeakerEN

The next question, Honourable Kempas, please.

Puan Hajah Alwiyah binti TalibBERSATU · PNEndauEN

Honourable Mr Speaker, question number 2.

What is the State Sports Council's plan to make use of all existing facilities after the postponement of SUKMA 2020, so that there is no waste and no damage?

SpeakerEN

Please, Honourable EXCO.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Honourable Speaker, thank you to Honourable Endau, who is representing Honourable Kempas. The question is, what is the State Sports Council's plan to make use of all existing facilities after the postponement of SUKMA 2020, so that there is no waste and no damage?

Honourable Speaker, this matter has been given close attention by the Right Honourable Menteri Besar, Dato' Hasni. The state government, through the Johor State Sports Council (Majlis Sukan Negeri Johor, MSNJ), has planned various activities and the organisation of competition-type programmes to use the existing sports facilities and amenities throughout the year 2021. MSNJ has also received positive feedback and response from sports enthusiasts to use these facilities. However, given that the COVID-19 pandemic situation remains uncertain and because we must comply with the SOPs announced by the federal government, most of the planned programmes had to be cancelled, and even training programmes involving Johor state athletes had to be temporarily halted to comply with the SOPs and to ensure we avoid the spread of COVID-19. Athlete training continues online while MSNJ studies the SOPs for sports bubble training. After studying the SOPs and considering the training needs of Johor state athletes, MSNJ has formulated a method suited to the sports bubble SOP (camp based training).

Honourable Chairman, for the information of this esteemed House, some SUKMA venues are also currently being used as Quarantine and COVID-19 Treatment Centres (PKRC), COVID Assessment Centres (CAC) and Vaccination Centres (PPV). The venues involved are the Pasir Gudang Municipal Stadium for gymnastics and gymnastics-rhythmic sports, Dewan Bukit Indah (CAC) for silat, Dewan Muafakat Adda Height for boxing, Dewan Raya Taman Universiti for secretariat logistics facilities, and the Arena Larkin Aquatic Centre, PPV OKU for aquatic sports. Overall, for the knowledge of Honourable Members, all SUKMA venues have been 100% completed.

This year, a total of 7 facilities under the Johor State Stadium Municipality have been allocated RM4.2 million for utility, cleaning, security and also maintenance costs. The cost details for each facility include an allocation of RM249,000.00 for the Taman Perling Badminton Academy, RM607,000.00 for the Taman Daya Hockey Stadium, RM660,000.00 for the Kluang Sports Complex, RM671,000.00 for the Nusa Duta Tennis Academy, RM1 million for the Johor Sports Complex, RM691,000.00 for the Velodrome, RM300,000.00 for Edu Hub Kanu.

Given that the organisation of the Malaysia Games 2020 Johor (SUKMA) has been postponed, the state government and the centre are still discussing whether SUKMA can be continued next year. This matter will be discussed with the new Honourable Minister and will be decided by the SUKMA Supreme Committee in the near future. Insya-Allah, Johor will be ready for whatever decision is made by the SUKMA Supreme Committee. (Recitation of verses from the Quran). We plan, Allah plans, and Allah is the best of planners. Thank you.

SpeakerEN

Yes, Semerah, supplementary question.

Honourable Mr Speaker, thank you for the answer. I would like to ask, apart from the stadium facilities and the existing buildings, what is the plan of the MSN regarding items such as footballs, rugby balls and all the items that we think cannot last long because they are made of leather. So, what is the MSN's plan, whether these will be handed over to associations, or just that the MSN keeps them until the next sports event? Thank you.

SpeakerEN

Please, Honourable EXCO.

Datuk Onn Hafiz bin GhaziUMNO · BNChairman of the Committee on Tourism, Youth and Sports · Layang-LayangEN

Thank you, Honourable Semerah, for that supplementary question. In terms of the sports equipment that has been purchased, the MSN has not yet made a decision because the decision at the central level has not yet been made. So we will, we will be guided by what the SUKMA Supreme Committee decides. Insya-Allah, for the information of the Honourable Member, this week we will meet with the Honourable Minister and we will recommend that the SUKMA Supreme Committee hold its meeting in the near future, because time is cost, we understand that. And, after that we will make a precise decision, Insya-Allah. Thank you.

SpeakerEN

The next question, Honourable Pasir Raja, please.

Puan Rashidah binti IsmailUMNO · BNPasir RajaEN

Honourable Mr Speaker, question number 3.

How many B40 families received the RM200.00 Goods Voucher in the Pasir Raja State Assembly constituency?

SpeakerEN

Please, Honourable EXCO.

Dr. Chong Fat FullPKR · PHChairman of the Committee on Unity, Trade and Consumer Affairs · PemanisEN

Honourable Mr Speaker, thank you Honourable Pasir Raja. The RM200.00 Goods Voucher Programme is one of the initiatives under the Johor Ihsan Economic Stimulus Package 3.0. It is estimated that 306 household members in the Pasir Raja State Assembly constituency will receive the goods vouchers. Thank you.

SpeakerEN

Pasir Raja, please, Honourable Member.

Puan Rashidah binti IsmailUMNO · BNPasir RajaEN

Thank you, Honourable EXCO, for the answer. As a supplementary question, may I ask the Honourable EXCO to inform us of the current status of this programme and what are the criteria or eligibility of the recipients for this programme? Thank you.

Dr. Chong Fat FullPKR · PHChairman of the Committee on Unity, Trade and Consumer Affairs · PemanisEN

Thank you. The current status of this programme is at the stage of finalising the agreement between the state government and the MyKasih Foundation by the Johor State Economic Planning Unit (BPENJ), and this agreement also covers similar assistance initiatives by the state government in the future. And I am pleased to inform you that the implementation of this programme does not involve any cost, and the entire allocation of RM60 million will be credited to 300,000 recipients, and implementation is expected to begin at the end of September, this month. And regarding the eligibility or criteria of the recipients for this programme, recipients are based on the list of B40 households who received the Prihatin Rakyat Aid (BPR) from the federal government through the Inland Revenue Board, and that list will be shortlisted, short list, according to total household income below the Poverty Line Income (PGK) in Johor of RM2,500.00, and from that total the list will be further arranged by priority based on the highest number of household members. Thank you.

SpeakerEN

The next question, Honourable Yong Peng, please.

Puan Chew Peck ChooDAP · PHYong PengEN

Honourable Mr Speaker, question number 4.

When will the road upgrading project from Yong Peng to Ayer Hitam be implemented?

SpeakerEN

Honourable Kota Iskandar, please.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHKota IskandarEN

Honourable Mr Speaker, question number 5.

The Skudai – Ulu Choh road is part of FT005 Skudai – Pontian. The road condition is bad, full of potholes here and there, and heavily laden with patches. Too many accidents have occurred involving vehicles, including motorcycles. What steps have been and will be taken by the government to overcome this issue?

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mohd Solihan bin BadriBERSATU · PHChairman of the Committee on Public Works, Transport and Infrastructure · TenangEN

Thank you, Honourable Mr Speaker. Assalamualaikum warahmatullahi taala wabarakatuh. Thank you to Honourable Yong Peng and Honourable Kota Iskandar, who are always concerned about the comfort of the people, especially road users. Allow me to inform this esteemed House about 2 categories of main roads in the state of Johor and in other states. State roads that use the code J, and federal roads that use the code FT, for example FT001 Jalan Johor Bahru - Gemas and J4 Jalan Gelang Patah – Tanjung Kupang.

Next, the allocation for federal road maintenance works is controlled by the Ministry of Works, where approval is subject to the concession agreement between the concession company and the central government. The contracts for federal road maintenance involving periodic pavement repair, for example resurfacing the road for the Johor Bahru – Gemas, Johor Bahru – Endau, Johor Bahru – Pontian and Muar routes, ended in 2018. The Public Works Department (JKR) Headquarters through the Facilities Maintenance Branch is in the process of preparing a new maintenance contract for periodic pavement works under a Performance Base Contract or PBC, with permission, which is a more efficient method of implementation, and is expected to be finalised in October this year.

As for the Yong Peng – Air Hitam road, the road upgrading project from Yong Peng to Air Hitam is part of a road alignment included in the list of proposed project applications under the Twelfth Malaysia Plan. However, the application for this project was not included in the list of high priority for implementation under Rolling Plan 1 and Rolling Plan 2 in the Twelfth Malaysia Plan. Nevertheless, for short-term repairs, JKR through the concession company constantly carries out pothole patching along this road from time to time while waiting for the new PBC contract to be enforced. Meanwhile, for long-term repairs, the JKR Batu Pahat District Office has forwarded an application for an allocation for mill and pave repairs, on a selective basis, in August 2021. The works will be carried out when the said allocation is received in due course.

Honourable Mr Speaker, to answer the question from Honourable Kota Iskandar, the JKR study found that the structure of the Skudai – Pontian road does need to be repaired. I myself have inspected the area and felt the discomfort at several locations. Therefore, JKR has submitted the list of maintenance work applications for the year 2021 involving all federal roads in the state of Johor, including the said route, in October 2020 for short-term maintenance. And the latest, the JKR Johor Bahru District Office has received an allocation of RM500,000.00 to repair the traffic light junction of Bandar Baru Kangkar Pulai which was found to be damaged and uncomfortable.

Through this esteemed House, the state government hopes that the federal government, through the Ministry of Works, will promptly finalise the agreement so that maintenance work on roads FT001, FT003 and FT005, totalling 540 kilometres, can be implemented immediately through the concept or method of PBC that I mentioned just now. I understand the estimated allocation applied for the works is RM140 million. Thank you.

SpeakerEN

Yong Peng, supplementary question.

Puan Chew Peck ChooDAP · PHYong PengEN

Thank you, Honourable Mr Speaker. Thank you for the question, and the answer from Honourable EXCO. I understand this road from Yong Peng to Air Hitam is to be mill and pave. I would like to inform this esteemed House of the opinion of the people of Yong Peng. The residents of Yong Peng, on roads that are patched like that, they call it a beggar's road (jalan pengemis), including roads that are merely patched, like beggars. This is indeed an impolite word. In my view, it is indeed not good if we can prioritise upgrading this road. If possible, prioritise the main road, the main road of Pekan Yong Peng. That is all, thank you.

SpeakerEN

No questions? Yes, Kota Iskandar.

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHKota IskandarEN

Thank you, Honourable Mr Speaker. This is the second time I am raising the issue of the FT005 Skudai – Pontian road, which is not merely a federal road but also a protocol road that should be well maintained, upgraded and properly serviced. This is because it reflects the image of Johor and the image of Malaysia. I was rather surprised when the Honourable EXCO just now said that the concession company's contract, namely Selia Selenggara, had already ended in 2018. No wonder that for the 2020 application from JKR, the Road Maintenance Estimate (APJ) of RM5.8 million was not approved, and for 2021 an APJ of RM6 million was only approved at RM500,000.00. Honourable Mr Speaker, this RM500,000.00 is not even 10%.

In my view, more determined efforts should have been made to ensure that the allocation for these maintenance works could be carried out. And what I see, because I face this issue every day. Honourable Mr Speaker, you too pass along this road every day. So, what has happened is that this road is patched merely like releasing a cough on the stairs. And when I checked the details of the work scope of this Selia Selenggara contract, it only carries out routine work and basic pavement work, namely patching of the pothole, patching the road, but does not carry out work involving functional and structural failure, which I also agree with the Honourable EXCO just now, that this road is in fact facing structural failure and also, and also, functional failure. So, I hope that...

SpeakerEN

Question, Honourable Member?

Tuan Sr. Dzulkefly bin AhmadAMANAH · PHKota IskandarEN

The question is because the maintenance cost is between RM5 and RM6 million a year. Does the state government intend to use its own funds to carry out the maintenance work, because the amount is not large, rather than waiting a long time for allocations from the federal government, yet the results obtained are not worthwhile for the efforts made by JKR. Thank you.

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mohd Solihan bin BadriBERSATU · PHChairman of the Committee on Public Works, Transport and Infrastructure · TenangEN

Thank you for the supplementary question. The first concerns Yong Peng. Indeed, Pekan Yong Peng is the route I take back to the Honourable Member's area. I too do pass through that area. I do not want to sit at the back; I sit in front because my car's shock absorber, well, it would not be proper for me to wait for the new car which has not yet arrived, and the road, indeed, that is what I always stress to the District Engineers and also the Senior Engineers at the State JKR, to include maintenance works immediately. Indeed, it is on the list, and I will ensure that after this, some areas need to be repaired immediately.

The second, regarding the proposal of the Honourable Kota Iskandar, indeed we have always exchanged letters and made calls or phone calls to Kuala Lumpur, that the new contract needs to be expedited. The new contract, the old contract ended in 2018, and we went through a change of government, through a change of government, change of officers. And, God willing, this will be finalised in October. The answer has been obtained by myself directly from the Ministry of Works, and as soon as we receive the allocation, we will carry out the upgrading or maintenance. Regarding the proposal that the state government use state funds for federal roads, that is not permitted or not proper, we will make sure of that, which is why I can guarantee that maintenance of the state roads under MARRIS is good, the others are fine, but the federal roads, or federal roads, indeed need improvement. I hope, or the state government hopes, that through this PBC we will obtain sufficient funds so that maintenance can be carried out immediately. Thank you.

SpeakerEN

Next question, Honourable Kukup, please.

Honourable Mr Speaker, question number 6.

Johor State is well known for its motto "Johor Berkebajikan", yet at the same time there is a growing issue of homelessness in this state. This issue has gone viral and has received coverage from foreign media. What actions will the Johor state government take to address this issue?

SpeakerEN

Please, Honourable EXCO.

Puan Zaiton binti Haji IsmailUMNO · BNChairman of the Committee on Women's Development, Family and Community · Sungai BalangEN

Assalamualaikum warahmatullahi wabarakatuh. Thank you, Honourable Mr Speaker, thank you, Honourable Tenggaroh. Honourable Mr Speaker, in answer to the question from Honourable Kukup, namely what actions the Johor state government will take to address the homelessness issue.

The state government, through the Johor State Social Welfare Department (JKM), has in fact always been concerned about the social and economic impacts faced by the people, including homeless persons affected by the COVID-19 pandemic during the implementation of the Movement Control Order.

For the information of the Honourable Member, the Johor state government, through the Johor State Social Welfare Department, has taken efforts to reach out to and rescue homeless persons since PKP 01, namely 13 March 2020, through the Integrated Operations Work Team led by myself, which involves 14 agencies and one non-governmental body, undertaking the trust to rescue and reach out to 248 homeless persons around Bandaraya Johor Bahru and placing them in a temporary transit centre at the Wawasan Gunung Pulai camp, Kulai, for temporary care and protection until the centre was fully closed on 9 June 2020.

Furthermore, for the information of the Honourable Member, the Johor state government, through the Social Welfare Department (JKM), continues to undertake and act to reach out to homeless persons, destitute persons and vagrants, to ensure that the problems of people in need are managed properly to improve their well-being. In 2020, JKM carried out reach-out and rescue work for homeless persons, destitute persons and vagrants in 132 rescue operations. Of these, 18 were integrated operations and 29 were scheduled operations.

In 2021, up to June, a total of 86 rescue operations had been carried out, involving integrated, ad hoc and scheduled operations across all districts of Johor state. A total of 124 beggars and vagrants were rescued, and the efforts taken towards homeless persons, vagrants and beggars at that time were:

1. Handing over to next of kin, placement in JKM institutions and NGOs. 2. Obtaining employment, residing in lodgings provided by the employer. 3. Housing placement because of working and having income to pay rent. 4. Sending back to next of kin who originate from outside the Johor Bahru district. 5. Referral for further action by enforcement agencies such as PDRM, AADK, the Prison Department, Immigration and hospitals for treatment of mental health problems and infectious diseases.

Honourable House, further, to ensure that this group also enjoys well-being and has the opportunity to have their own income, the state government, through the strategic cooperation of agencies PERKESO (Social Security Organisation), the Social Welfare Department, the Malaysian Red Crescent Society, the National Welfare Foundation and the National Organisation of Skilled Workers, Youth, has implemented a specific programme for them, namely the special interview programme for homeless persons, Khas 1.0, 2021. This interview programme involved 6 employers, namely Polycare Optical Malaysia Sdn. Bhd., JCY HDD Techonolgy Sdn. Bhd., ATA Industrial Sdn. Bhd., Kulim Malaysia Berhad and Pelabuhan Tanjung Pelepas Sdn. Bhd. Through this programme, a total of 30 candidates took part in the interview session, and as a result, 26 persons were successfully offered employment, namely 13 of them were offered work at Pelabuhan Tanjung Pelepas Sdn. Bhd., 12 others obtained jobs as production operators in the manufacturing sector, while one other candidate was successfully offered a job as a plantation general worker in an oil palm estate. The latest action taken to curb the spread of COVID, the COVID-19 virus, the rescue operation for destitute persons around Bandaraya Johor Bahru phase 1, namely women, was carried out on 4 August, led by the Honourable Dato' District Officer of Johor Bahru together with 18 government agencies including the Social Welfare Department. The result of the operation was the rescue of a total of 23 homeless women. After screening by the agencies, 1 homeless person was handed over to a family member, 4 homeless persons were sent back to their homes, action by the Ministry of Health agency for 4 persons with mental health problems, action by the AADK agency for 3 persons, action by the Royal Malaysia Police and the Immigration Department for 2 persons, and 9 homeless persons are currently placed at Anjung Singgah of the National Welfare Foundation.

At this time, MBJB together with Majlis Bandaraya Iskandar Puteri and Southern Volunteers are actively carrying out work to move equipment and necessities and maintenance at the temporary shelter for homeless persons located at the Taman Perling Women's Protection Centre, to accommodate the rescue operation for homeless men that will be carried out in the near future. At this temporary shelter, it is expected to be able to accommodate a capacity of 200 homeless men.

For the information of this honourable House also, MBJB is actively developing the Johor state homeless transit centre, which is expected to be completed by mid-2022, and this centre is being built at Taman Larkin Perdana with an estimated cost of RM7.6 million.

For the information of this honourable House as additional information, homelessness does not fall only under the Social Welfare Department but under several agencies such as the Local Authorities, namely the Local Government Act 171, the Street, Drainage and Building Act 1974, Act 133, the Social Welfare Department, the Destitute Persons Act 1977 Act 183, the Ministry of Health Malaysia, the Mental Health Act 2001 Act 615, the National Anti-Drugs Agency, the Drug Dependants (Treatment and Rehabilitation) Act 1983 Act 283, the Immigration Department of Malaysia and the Royal Malaysia Police are related acts. Thank you.

SpeakerEN

Yes. Next question, Sri Medan. Please.

Honourable Mr Speaker, my question number 7.

Internet access in rural areas is still at an unsatisfactory level. What are the state government's plans to upgrade the telecommunications system in the state of Johor?

SpeakerEN

Pulai Sebatang. Please.

Tuan Haji Aminolhuda bin Haji HassanAMANAH · PHParit YaaniEN

Honourable Mr Speaker, question number 8.

There are still complaints of weak Internet access in certain areas that disrupt the performance of BDR (Learning from Home) and PdPR (Teaching and Learning from Home). Can the state government share which areas in Johor still do not have fibre optic cable networks and when these areas can obtain this network?

Speaker

Jemput, EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Assalamualaikum warahmatullahi wabarakatuh. Bismilahirrahmannirrahim. Honourable Mr Speaker, thank you to Sri Medan and also Pulai Sebatang. Allow me to answer question number 109 and 191 as questions 7 and 8, and some of this question answers the questions of the Honourable Members from Endau, Johor Lama, Jementah and also Semerah.

I see that there are similarities in the questions put to me regarding Internet access and the government's action to upgrade the telecommunications system in the state of Johor. The government, through the Malaysian Communications and Multimedia Commission, SKMM, has plans to upgrade the telecommunications system, especially in rural areas, through the National Digital Connectivity Action Plan (JENDELA), which was developed collectively by industry players and the government.

Honourable Mr Speaker, the government truly understands the telecommunications coverage problems faced by the people today, and it cannot be denied that there are still many areas that have not received complete telecommunications coverage. The majority of areas that have not obtained access to fixed fibre optic lines are in rural and interior areas where the population is less dense, the majority of residents are senior citizens, and areas of settlement or villages within estates, as well as settlements that do not have complete road access and electricity connections, such as Orang Asli villages, FELDA settlements, settlements on islands, network villages and so on.

Honourable Mr Speaker, telecommunications service providers do not wish to invest in such areas because the development and operating costs are too high, but there is no traffic and possibly no subscribers, or the subscription rate is low. Although the National Digital Connectivity Action Plan (JENDELA) has been developed to overcome this problem, there are constraining factors that need to be resolved and addressed in realising this aim. Therefore, JENDELA is planned to be implemented in phases over at least a period of 5 years starting from 2020.

For the expansion of mobile broadband coverage in Johor state, JENDELA, implemented in phases with phase 1 starting in 2020 until 2022, targets the construction of 233 new telecommunications towers, the majority in rural areas, and 107 of them have been completed as at June 2021. Sorry, 101. In addition, a total of 3,409 existing transmitters will be upgraded to 4G services, and 2,877 of them had been completed for upgrading as at June 2021. As for the coverage of fixed broadband in Johor state, JENDELA phase 1 also targets a total of 413,493 additional premises, most of which are also in rural areas, to gain access to high-speed fibre optic broadband, with 146,766 of them having been passed by completed fibre optic infrastructure as at June 2021.

Additional information for Members of the House, phase 1 will also gradually shut down the 3G network, where 3G is expected to be fully terminated by the end of 2021. This is to improve the quality of the 4G network and indirectly provide a strong foundation for the implementation of the 5G network starting from the fourth quarter of 2021. Thank you.

SpeakerEN

Yes, Sri Medan. Please.

Honourable Mr Speaker, thank you for the answer given by the Honourable EXCO. I have a supplementary question. What we are experiencing today may be rather different from what some parties are experiencing in rural areas, eh, in urban areas. The problem of Internet access occurs in rural areas. So, what the state government has done previously, namely establishing the Muafakat Johor wifi which to some extent is able to provide Internet access facilities in areas overseen by local authorities. I would like to suggest whether this method can be expanded? Let us add more Muafakat Johor wifi locations to help the community obtain faster Internet access in rural areas. Perhaps this situation does not occur in the Honourable Mr Speaker's area, because Honourable Mr Speaker lives in an urban area, but when the government today introduced PdPR, namely Teaching and Learning from Home, it has had a very great impact. So, what is being done by the Ministry of Education is not aligned or in step with the Internet development that exists in Johor state today. Thank you.

SpeakerEN

Please, Honourable EXCO.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Thank you to the supplementary question, Honourable Mr Speaker. Johor Wifi, we call it Johor Wifi 1.0, starting from 2016 and ending in 2021. And we have launched Johor Wifi 2.0, which runs from 1.07.2021 until 30.6.2024. Of course the state government intends to improve the wifi system from 1.0 to 2.0. Among the improvements, there were indeed changes in terms of the appointment of contractors, namely the new contractor MNM Savetech, and the improvement involves replacing access points to enhance capacity and speed, and we are upgrading mostly in PPR (People's Housing Projects) areas, PBT (local authority) areas and a small portion in rural areas. And we are in the process of adding locations, namely about 30 new locations, and we also obtained cost savings by appointing a new contractor. And the addition of these locations is still partly under study by the PBT, District Offices and the ICT Division. We, the state government, are very committed to further expanding the Johor Wifi service. Thank you.

Honourable Member, Honourable Mr Speaker.

SpeakerEN

Please, please, please.

We know that now all rural areas are in the process of improving Internet access through the JENDELA project. So, I would like to know so far what percentage of this JENDELA project has been implemented and when it is expected to be completed in full, because we are all aware that all pupils in rural areas face problems with this Internet issue. So I hope to get an explanation from the Honourable EXCO. Thank you.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Thank you, Mr Speaker. The JENDELA project has two initiatives, one private-sector initiative and one government initiative. Usually in rural areas we use mobile broadband, and mobile broadband depends on towers. And these towers, in fact the JENDELA project, if we go by the original information before the change of government, the tender closing date was extended from 25 February to 31 March and it was expected to be awarded in August. But when there was a change of government, I do not yet have the latest data. If we go by the old timeline, provided there are no problems with the approvals from the PBT (local authorities) and so on, we could complete it within one year. We estimate one year based on the earlier NCP project. We have experience in the state of Johor. The JENDELA project is actually a federal government initiative. The federal government decides everything.

At the state level, we help by resolving problems and issues involving land, including land for transmitter sites, and also involving permits from the PBT. That is the state government's initiative. In the earlier NCP project, we helped 13 projects, and in the end we completed them in less than one year, and all of them went on air. What we see is that there are 22 direct awards. These are still at the basic stage for the issue of resolving land problems and also PBT approvals. Alhamdulillah, the state government has approved a paper under the Local Government and Housing Portfolio, namely we approved a paper to set up a one-stop centre. Through this one-stop centre, we can bypass, or at least reduce, the risk of bureaucratic problems within government departments. And our problem is the 107 that were tendered just now. These 107 involve mostly rural areas, and this one is still pending (KIV). If the federal government can expedite this, it will greatly help improve the Internet system in rural areas.

And my initiative is, please, not just to be debated in this august House. I also request that we, as the government's strategic partners and the opposition, our representatives in Parliament, bring this to Parliament to be debated so that we can work together towards helping Johor obtain better Internet facilities. And we in the government are not failing to follow up. I always bring this issue to state government meetings to be discussed with the Most Honourable Menteri Besar so that we can take it up with the federal government. And as the newly appointed minister, I have already applied for an appointment next week so that we can discuss where the JENDELA project is heading, what its latest status is, and when we receive information, Insya-Allah, I will inform all the Honourable Members here.

And I also take this opportunity to ask the Honourable EXCO whether, in this question, how we can make it easier to handle complaints. The Honourable Members, in addition to using the existing system, the online portal for complaints, may also, if the Honourable Members wish, contact me directly. I myself can go down to the ground, and I have already resolved several issues, especially in, for example, Bekok. The Honourable Bekok and I went down to the field ourselves, entered the Orang Asli villages, and we were able to try to help resolve them. But the absolute solution lies with the federal government. For example, in Bekok, in the planning there is indeed a tower under the 107 project, there is a tower in Kemida, but because this project has not yet been awarded, we cannot resolve it. But there are many other side matters where we can help the Orang Asli community, such as giving them some financial assistance so they can build huts for, as it happens, there is an area that gets coverage at the forest fringe,

which we help with together. I think the people of Bekok went there together to resolve the problems of the people. Thank you, Honourable Mr Speaker.

SpeakerEN

Next question, the Honourable Stulang, please.

Tuan Chen Kah EngDAP · PHStulangEN

Honourable Mr Speaker, my question is number 9.

What is the increase in social/family problem cases during the COVID-19 pandemic Movement Control Order (PKP), in terms of divorce, suicide attempts, severe financial problems and so on?

SpeakerEN

Please, the Honourable EXCO.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

In the name of Allah, the Most Compassionate, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah. Honourable Mr Speaker, in answer to Stulang. Every family complaint made is received through the sources of the District Kadi's Office, the hotline, and also the Family Service Centre, the Social and Community Family Service Centre (KSK Care Centre), with permission. Throughout the period of the PKP, complaints were received only through online methods. Family counselling sessions were conducted only through appointments that had been fixed in advance.

For the period from March to July 2021, Honourable Mr Speaker, the complaints received are as follows. The total complaints received for March 2021: for the District Kadi's Offices, 271 complaints; the Malaysian Islamic Marriage Management System (SPPIM), 739 complaints; the hotline, 17 complaints; the Family Service Centre, Social and Community Service Centre (KSK Care Centre), 27 complaints. The total number of complaints from March to July 2021 for the information of Honourable Mr Speaker is 1,054 complaints. The breakdown of complaints by district is as follows: Johor Bahru 225 complaints, Muar 160 complaints, Kluang 107 complaints, Batu Pahat 122 complaints; Kota Tinggi 109 complaints; Pontian 72 complaints; Mersing 40 complaints; Tangkak 55 complaints and Kulai 42 complaints, the total number of complaints being 1,054.

For domestic violence cases recorded in that period, it was 13%, that is 137 complaints out of the total complaints received. For the information of Honourable Mr Speaker and Members of the House, the Malaysian Islamic Marriage Management System (SPPIM) is a system developed by JAKIM (Department of Islamic Development Malaysia) based on work processes for coordinating all State Islamic Religious Departments throughout Malaysia, especially in the state of Johor. The District Islamic Affairs Offices in Malaysia are even more efficient and orderly. The modules contained in SPPIM include applications for pre-marriage courses, applications for marriage permission, marriage registration, right up to the processes of divorce, reconciliation (rujuk) and mediation (runding cara). It was first applied for mediation purposes, for the information of Mr Speaker, at all Kadi Offices throughout Johor starting April 2021. For the hotline, the mediation and counselling service began operating in June 2021.

Honourable Mr Speaker and Members of the House, for the data on marriages, divorces and reconciliations throughout the Movement Control Order (PKP), PKPB, PKPP, and PKP Phase 1 in the state of Johor, the figures are as follows. For 2020 (March to December), for the district of Batu Pahat: marriages 2,032, divorces 522, reconciliations 59; for the district of Muar: marriages 1,245, divorces 289 and reconciliations 37; for the district of Segamat: marriages 943, divorces 138 and reconciliations 3; for the district of Johor Bahru: marriages 3,268, divorces 1,344 and reconciliations 228; for the district of Kluang: marriages 1,255, divorces 302 and reconciliations 41; for the district of Pontian: marriages 1,035, divorces 260 and reconciliations 43; for the district of Kota Tinggi: marriages 1,255, divorces 321 and reconciliations 16; for the district of Mersing: marriages 569, divorces 87 and reconciliations 4; for the district of Kulai: marriages 833, divorces 144 and reconciliations 16; and for the district of Tangkak: marriages 721, divorces 92 and reconciliations 10.

Honourable Mr Speaker and also Members of the House, for 2021 (January to July), district of Batu Pahat: marriages 1,622, divorces 15, reconciliations 10; Muar: marriages 951, divorces 100, reconciliations 9; for the district of Segamat: marriages 337, divorces 66, reconciliations 10; for the district of Johor Bahru: marriages 2,917, divorces 575 and reconciliations 72; for the district of Kluang: marriages 672, divorces 114 and reconciliations 16; for the district of Pontian, Honourable Mr Speaker: marriages 735, divorces 30 and reconciliations 3; for the district of Kota Tinggi: marriages 880, divorces 33 and reconciliations 2; for the district of Mersing: marriages 337, divorces 18 and reconciliations 2; for the district of Kulai: marriages 605, divorces 43 and reconciliations 8; for the district of Tangkak: marriages 528, divorces 45 and reconciliations 1. The overall total, Honourable Mr Speaker, for March 2020 to December 2020: marriages 13,196, divorces 3,459 and reconciliations 457. For January 2021 to July 2021: marriages 9,614, divorces 1,039 and reconciliations 135. For the statistics on domestic violence cases in the state of Johor for the period January to August 2020 until January to August 2021...

SpeakerEN

Just give the total, Honourable, no need to go by district.

Tuan Haji Tosrin bin JarvanthiBERSATU · PHChairman of the Committee on Islamic Religious Affairs · Bukit PermaiEN

The overall total is 503 cases, Honourable Mr Speaker. For January to August 2020, 503 cases; January to August 2021, 444 cases. That is all, Honourable Mr Speaker.

SpeakerEN

It is already 10.30, I will end the question session.

Tuan Chen Kah EngDAP · PHStulangEN

Honourable Mr Speaker, there is a question.

SpeakerEN

This oral question session is already late, Honourable Member. I will end this oral question session. Any questions listed that have not been answered orally will be answered in writing during the same Sitting.

ClerkEN

For written questions, the answers to written questions by Honourable Members have been tabled on the table of the House.

Continuation of debate on the Royal Address of His Majesty the Sultan of Johor.Address / budget

SpeakerEN

Honourable Members, for information, today we will hear the winding-up speeches of four Honourable Committee Chairmen, with 20 minutes allocated to each. After that, the winding-up by the Most Honourable Menteri Besar.

Answers to questions raised during the debate session by Honourable Members will be answered in writing by the other Honourable Committee Chairmen today as well.

The debate is resumed now. Please, the Honourable Chairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources, 20 minutes, please proceed.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Thank you, Honourable Member, Mr Speaker. Bismillahirrahmanirrahim. (Recites salawat.) Peace be upon you, and may the mercy and blessings of God be upon you, and greetings of peace. First and foremost, with the fullest respect and reverence, your humble servant respectfully pays homage and holds in the highest esteem the gracious consent of Duli Yang Maha Mulia Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Ta'zim, who was graciously pleased to grace us with his presence to officiate at the opening of the Fourth Sitting of the Fourteenth Johor State Legislative Assembly on Thursday. May Your Royal Highness always be blessed with good health, blessings, greatness, sovereignty and well-being.

Honourable Member, Mr Speaker, I also wish to take this opportunity to record my deepest thanks to all Members of the State Legislative Assembly who took part throughout the sitting and who have shown their concern by sharing information, ideas and views that are sound, and who have touched on issues relating to the portfolio under my responsibility. Throughout the sitting, it is clear that issues relating to the investment sector, entrepreneurship and the human capital sector have received attention and have become a sensational topic among the Honourable Members. God willing, I will try to give a thorough explanation and clarification to answer all the questions raised by the Honourable Members. Therefore, I will structure my winding-up speech into three main parts based on the portfolio under my responsibility, which is also a sector that was very severely affected during the dark period of the COVID-19 pandemic.

In celebration of Independence Day, I would like to share a pantun:

"A independent nation, a treasured heritage, firm unity sheltered under the Sultan, Malaysia Prihatin, the national day theme, noble identity, the foundation of unity."

Honourable Member, Mr Speaker, from the beginning of 2020 up to this moment, the whole world has been shocked by a dark moment following the attack and spread of the deadly COVID-19 pandemic. The attack has not only had a negative impact on the world's socio-economic situation, but it has also demanded a paradigm shift in the existing situation, namely a change from the normal way of life to the previous customs, to a new norm. The country of Malaysia and the state of Johor are not exempt from all the changes that have occurred. The COVID-19 pandemic has directly affected the ecosystem of life and also the economy of the country. The state of Johor is not exempt from suffering the adverse effects of this deadly pandemic. This situation has been made worse by the uncertain political arena of the nation, which has contributed to instability. Political stability and economic development are interrelated elements in the context of assessing the economic and social development of a country or state.

From the perspective of investment in particular, the instability of the nation's political landscape will not only threaten and affect the confidence of new investment, but it also has an impact on and undermines existing investment in the country and also in this state. Instability and the prolonged drama of political controversy will give a negative impression to local and international investors who are trapped in an uncertain situation. Through a stable government, economic development can be enhanced through fiscal policy and investor-friendly measures.

Therefore, the view of the Honourable Parit Raja regarding the investor-friendly policy of the Johor state government, the readiness of the best incentives and infrastructure, and cooperation between agencies, which is hoped to give confidence that the entry of new investors can add value to the government, is very well received and is in line with the approaches that have been taken by the state government.

Honourable Member, Mr Speaker, the state of Johor remains one of the competitive states in the investment sector despite facing various obstacles and constraints in realising investments that come in during this difficult period. This can be demonstrated based on the report of the Malaysian Industrial Development Authority (MIDA) for 2020: the state of Johor succeeded in attracting investment with a total value of RM6.7 billion, and of that amount, RM4.2 billion was from foreign investment. Meanwhile, RM2.5 billion was domestic or local investment. As a result of these investments, 13,052 job opportunities were created from a total of 232 companies, as well as projects that have been approved. For 2021, up to March, the state of Johor has succeeded in receiving total incoming investment valued at RM1.7 billion. Of that amount,

the value of foreign investment successfully brought into the state of Johor was RM369 million. Meanwhile, of the total local and domestic investment successfully received, it amounted to RM1.3 billion. The investment involved 49 companies and is expected to create 5,394 job opportunities for the people of Johor.

Honourable Member, Mr Speaker, in the effort to upgrade the domestic industrial ecosystem that can attract investors and support major foreign projects, the state government is also actively planning and preparing short-term, medium-term and long-term planning blueprints to drive the direction of the state's investment sector in facing the challenges of the global world after COVID-19. As announced by the Most Honourable Menteri Besar, and shared in this august House previously, the state government has also introduced several initiatives to support the achievement of this state's investment sector so that it becomes competitive and active again after being badly battered by the COVID-19 pandemic. Among the initiatives referred to are the establishment of the Ibrahim Johor Economic Counsel initiative. The establishment of the Johor Economic Tourism and Cultural Office initiative, which is expected to begin operating in Singapore at the end of this year, and the Singapore – Johor – Kepulauan Riau (SIJO-KEPRI) initiative, which is a strategic joint venture between the countries involved for smart cooperation in the investment, trade, industrial and other sectors.

The Johor state government, through the state's official investment agency, Invest Johor, continues to actively implement initiatives to attract more investors into this state. In line with its objective of establishment, Invest Johor is strongly committed to providing professional and high-quality services to investors who are interested in conducting business in the state of Johor. For information, the Johor state government through Invest Johor is in the final process of publishing the Johor State Investment Master Plan 2020 – 2030. It is currently at the procurement stage. This investment master plan will also serve as an additional reference alongside the Johor Economic Sustainable Development Plan. With the addition of this focused strategic plan, it can help in efforts to improve the direction and strategy of the Johor state government in attracting high-quality investment activities so that the spillover from the investment brought in can benefit the development of the state's human capital in particular and further boost the economic growth of the state of Johor in general.

Honourable Member, Mr Speaker, the state government through Invest Johor and also JETCO is now actively carrying out various initiatives to increase existing investment, in addition to intensifying efforts to ensure that the state of Johor remains a major investment destination. Among the initiatives that have been implemented are the organising of engagement sessions with various organisations, associations and societies, and foreign and local businesses to obtain feedback and information relating to all the problems currently faced by industry. This effort shows the state of Johor's concern for the problems that have occurred.

Invest Johor and JETCO have also actively held several dialogue sessions, whether physically or virtually, with several associations, manufacturers and industry players as a sign of support, and to further give attention and immediate action on all the complaints that have been raised by industry. In addition, promotion sessions and two-way discussions with virtual investor prospects have also been consistently carried out by Invest Johor to attract investment into this state. This effort is very important to give confidence to prospective investors to continue making the decision to invest in this state. Among the organisations, associations and societies that have been involved in the dialogue sessions held are the Johor Bahru Chinese Chambers of Commerce, the Malaysia International Chambers of Commerce & Industry, the Singapore Business Council and the Singapore Business Federation, AME, and all companies and industries within the I-Park Industrial area, the Muar Furniture Association, Boss Club Malaysia and many others.

All the initiatives that have been implemented will continue to be intensified from time to time to guarantee the confidence of existing investors and further enhance the eligibility and commitment of new investors to make investments in this state. All the diligent efforts of the state government that have implemented various initiatives to improve the performance of the investment sector are seen to be bearing fruit or very positive achievements. This can be proven by the value of potential investment that is currently under negotiation. Based on the Invest Johor report as of 1 September 2021, the cumulative value of investment that has the potential to be brought into the state of Johor this year is expected to reach RM5.5 billion. It is only a matter of time before the agreement documents are sealed.

Honourable Member, Mr Speaker, in response to the issue raised by the Honourable Bekok regarding the failure to attract investors or vaccine manufacturers from Europe to set up factories in this state. For the information of the Honourable Member, multinational pharmaceutical firms have the freedom to determine their final choice from several location options consisting of several countries, including from developing and developed countries, to house their operations or establish their factories. Compared with the country of Singapore, that neighbouring country has a strong foundation in terms of the IT environment and a robust and trusted legal system. The existence of talented manpower and commitment to research and innovation, and Singapore is in second place in the world and first in the Asian region with the best IT protection, and this is contained in the World Economic Forum Global Competitiveness Report 2019. Generally, when we refer specifically to IT in Iskandar Malaysia, which is subject to the national IT system, it is in an unsatisfactory position. Therefore, it is very difficult to convince manufacturers to place their investments here, even though we offer and have lower infrastructure costs.

Honourable Member, Mr Speaker, the health crisis that has hit the country following the COVID-19 pandemic has directly become a threat to the economic stability of the country and especially the state of Johor, as it has left a profound impact on state investment, the growth of Malaysia and the state of Johor in 2020. It cannot be denied that the economic sector and ordinary people continue to be affected following the prolonged PKP orders. Nevertheless, in terms of the state's economic projection for 2021, the performance of the state of Johor is expected to see a projected increase of between 3% and 5%. This positive projection is based on confidence in and the effectiveness of the initiatives in the Budget 2021 as well as the Stimulus Package that was announced by the Most Honourable Menteri Besar. The implementation of initiatives, including the provision of incentives to target groups, is seen to have had a positive impact on the state's socio-economic development.

Honourable Member, Mr Speaker, in the current situation of an uncertain economy, where the rate of demand is lower and slow or non-existent due to restrictions on the movement of economic activities following the implementation of PKP orders. The SME entrepreneur group is seen as one of the business segments that has been severely affected. Among the main factors contributing to this situation is that these entrepreneurs usually operate with limited resources and are typically labour-oriented. These entrepreneurs will also use a larger portion of their expenditure budget for hiring labour and consequently obtain small profit margins from the business activities they carry out.

Based on the source from the Department of Statistics Malaysia in the Economic Census 2016, the state of Johor has 98,190 SMEs and is the 3rd largest in number of SMEs out of the total number of SMEs in Malaysia. Of that number, 70% are micro-sized enterprises. For these SME entrepreneurs, among the objectives to be achieved during the hibernation period is to ensure that business status can be maintained even though their business operations have been disrupted. Among the major challenges faced are the need to pay supplier debts and premises

rent, as well as fulfilling the responsibility of retaining workers. However, the PKP order, followed by PKPB and also PKPP to contain the spread of the deadly COVID-19 pandemic, has contributed to high rates of loss and has caused the temporary closure of several business sectors.

Honourable Member, Mr Speaker, in line with the implementation of the PKP, PKPB and PKPP orders, which were implemented in March 2020, various initiatives have also been launched, channelled by the federal and state governments for the purpose of protecting lives, ensuring well-being, empowering entrepreneurs and subsequently driving the state's economic growth. Recognising the important role of the SME group in the state economy and its vulnerability to any uncertainty, comprehensive and dynamic various initiatives and stimulus packages have been introduced and implemented by the state government to assist the entrepreneurship segment. The state government's concern to overcome all the problems and further help empower the affected entrepreneurs has already been expressed through the launch of the Economic Stimulus Package announced by the Most Honourable Menteri Besar of Johor since the very first phase of the PKP.

The three phases of the economic stimulus package that I refer to are Economic Stimulus Package 1.0 with an allocation of RM163 million, Economic Stimulus Package 2.0 with an allocation of RM117 million, and the latest, Economic Stimulus Package 3.0, which has been allocated RM209 million. This makes the total allocation for these three series of stimulus packages RM491 million, involving 103 initiatives.

Honourable Member, Mr Speaker, this state government is aware of the need for the state of Johor to be a pioneer and role model for other states in Malaysia. Therefore, the Most Honourable Menteri Besar has graciously allocated funds, particularly in the Johor Budget 2021, to assist affected Johor entrepreneurs and to further empower the entrepreneurship sector in this state through the Johor Niaga agenda, which contains 8 initiatives. Through the Johor State Entrepreneur Corporation (PUJB) as the official implementing agency, the government has allocated RM8 million for the implementation of various initiatives as well as the provision of incentives to help guide and further empower entrepreneurs in this state. Among the initiatives that have been and are being implemented by PUJB are Geran Orang Lokal 3.0, Misi Jejak PKS Johor 2021, empowering entrepreneurs with incentives for opening company accounts, the Johor Entrepreneur Training Programme, PERKASA Johor IP, SME Gold Digital, Jelajah Usahawan Johor, product promotion for SMEs, the Johor SME Townhall Session, the Local Economic Development Programme, JIP, Gerak PKS Makmur Johor 2021 COVID-19, and many others.

I greatly welcome the view of the Honourable Parit Raja who has proposed that the allocation for local development programmes be increased to a larger amount so that it can open opportunities and provide more and broader initiatives for entrepreneurs who are interested in starting pioneering projects.

For the information of Mr Speaker and the Honourable Members in this august House, the state government through PUJB as well as the Johor State Entrepreneur Development Council members have also provided various incentives in the form of grants and financing assistance for the convenience of the entrepreneur group. For grant-based incentives, among the departments or agencies directly involved in providing grants are the Johor State Agriculture Department, SME Corp., KEJORA, TERAJU, SIRIM, FAMA, MATRADE and many other agencies. The grant incentives offered and provided cover the purchase of machinery equipment or improving entrepreneurs' premises, as well as programmes and training. Based on the latest report from the departments and agencies involved, up to July 2021, the value of grant assistance community disbursed amounted to RM18.706 million, and it has benefited 5,979 entrepreneurs in the state of Johor.

SpeakerEN

Is there much more, Honourable Member? Is there much more?

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Many more have yet to be covered. As for incentives in the form of easy financing assistance, the cumulative value of easy financing assistance approved by PNB Johor up to July 2021 totalled RM332.676 million. This has benefited 21,000 entrepreneurs in the state of Johor. Among the departments or agencies involved in implementing this incentive are TEKUN, MARA, SME Bank, MIDF, Amanah Ikhtiar, Dana Wakaf JCorp, Petronas and other agencies.

Mr Speaker, I will take only a little more time. To answer the question from the Honourable Member for Bekok, Bentayan, Buluh Kasap regarding the plight of entrepreneurs in the state of Johor during the COVID-19 pandemic. As we are well aware, the federal government has introduced various plans and economic stimulus packages to stimulate the growth of the national economy. The state government has also taken comprehensive and holistic action to tackle all the problems in order to return economic growth to the right track. Various planning schemes for the short term, various planning schemes for the medium term, and whatever is planned for the long term have been drawn up by the state government in an effort to restore the competitiveness and resilience of entrepreneurs as a catalyst for the welfare of the people and the economic prosperity of the state. In terms of the release of plans and economic stimulus packages as one of the short-term plans by the government itself to date, the release of the Johor Sustainable Development Plan 2030 is one of the long-term plans.

The digital transformation of these entrepreneurs is one of the long-term plans to empower the economic sector in the state of Johor. It also involves corporate culture, organisational processes, business models and also the capabilities of entrepreneurs. Digital transformation refers to the improvement of mechanisms by utilising digital data technology such as Artificial Intelligence (A.I).

Mr Speaker, the state government has also taken pragmatic steps to help expose and encourage entrepreneurs in the state, as well as address their concerns, through the implementation of initiatives based on the digital economy. The Johor e-Market Place initiative is one of the Johor government's initiatives to help entrepreneurs continue to progress through online business. This initiative has proven to benefit 13,000 entrepreneurs in this state in the first series. And it will also continue with series 2 this year. For your information, on the 9th of this month, this programme will be carried out by the Most Honourable Menteri Besar of Johor.

Mr Speaker, for everyone's information, the number of the labour force in Johor, which includes workers who are unemployed, in the second quarter of 2021 was recorded at 1.7 million who are employed and unemployed, yes. This figure shows an increase compared with the same quarter last year of 1.75 million. Therefore, the labour force participation rate in the state of Johor recorded in the second quarter of 2021 has also shown an increase of 0.4 percentage points to 67.6%, compared with 67.2% recorded in the first quarter. Following the directive of the Movement Control Order (PKP) at the beginning of 2021, several business and service industry sectors experienced operational restrictions, which in turn contributed to a reduction in consumption as well as in employment in the sectors concerned.

SpeakerEN

One more minute, Honourable Member, one more minute. You have already been speaking for 24 minutes, Honourable Member.

Datuk Mohd. Izhar bin AhmadBERSATU · PHChairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources · LarkinEN

Okay. Mr Speaker, for the purpose of defending the workers in this state who have been affected by COVID-19, as the responsible agency we have offered various incentives and assistance to workers through PERKESO, the Social Security Organisation, and many programmes and assistance have been organised by PERKESO. So I will summarise further. PERKESO has also taken the initiative of playing a role as a database for collecting information and as an information centre on the human capital sector and the total supply of employment.

Mr Speaker, before I conclude my winding-up, I would like to record my heartfelt thanks to all the Honourable Members who have displayed a high degree of professionalism, interacted maturely, shown tolerance and mutual respect among Honourable Members, which in turn contributed to harmony in this august House. The sitting of the Assembly was also able to be carried out smoothly and effectively. This is a unique feature of the Johor State Legislative Assembly under the administration of the Most Honourable Menteri Besar of Johor, and the true character of us all as Members of the State Legislative Assembly.

Praise be to Allah SWT, although we differ in understanding and political ideology, this has never disturbed our commitment to always stand shoulder to shoulder in safeguarding the purity and welfare of the people and to remain focused on developing the progress and economic growth of this state. That is the promise and principle of us all for the sake of Johor. The state government is also always open-minded and ready to accept all constructive criticism and feedback in an effort to improve administrative matters and also the state's planning schemes from time to time, so that the sustainability of the state can continue to be strengthened.

Today you are there, we are here; tomorrow you will be here, we will be there. PRU-15 will be upon us this time. Whether we remain or disappear, who knows where.

I would also like to take this opportunity to record my highest congratulations and thanks to the Most Honourable Menteri Besar of Johor, who has succeeded in reflecting a good form of leadership that is more focused and has provided much support and backing as well as assistance to all Members of the State Legislative Assembly without regard to background and political ideology. This is not an easy thing, to be a fair and equitable leader in the very challenging situation of today. Our unwavering support from all of us will continue in order to achieve the mission and vision of the government as has been targeted.

Mr Speaker, we must remember that a people that is divided, without unity or brotherhood, is a weak and fragile people. There are far too many examples we can take as lessons. We have witnessed states that are not united and that are prone to division. The country is not peaceful and harmonious. They will continue to be shackled and face various problems which clearly harm themselves and the people in particular. Let us together preserve, strengthen and reinforce the bonds of brotherhood among us. Do not let them be severed and destroyed. Build on the foundation of faith and unity as advocated and emphasised in the word of Allah SWT in Surah Al-Hujurat, verse 10, which reads (recitation of part of the verse from the Quran), which means, "Indeed, the believers are but brothers, so make peace between your two brothers who are in dispute. And fear Allah that you may receive mercy."

In conclusion, let us together build the nation and the beloved state of Johor. With Allah's guidance and success, and may the peace, mercy and blessings of Allah be upon you. Thank you.

SpeakerEN

Thank you to the Chairman of the Committee on Investment, Entrepreneur Development, Cooperatives and Human Resources. Next, I invite the Honourable Chairman of the Committee on Housing and Local Government. 20 minutes, please proceed.

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Thank you, Honourable Member, Mr Speaker. Assalamualaikum warahmatullahi taala wabarakatuh. Greetings of peace, greetings of prosperous Johor. Mr Speaker, thank you for giving Rengit the opportunity to take part in the debate in gratitude for the Royal Address of His Majesty Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan of Johor, at the official opening of the First Meeting of the Fourth Session of the Fourteenth Johor State Legislative Assembly.

Mr Speaker, a hearty congratulations and a bouquet of flowers to Mr Speaker and the Honourable Deputy Speaker for conducting this sitting of the House calmly, orderly, firmly and punctually. I believe that for the first time in the 18 years I have been in this House, from being just one opposition member in 2004, to six opposition members in 2008, to eighteen opposition members in 2013, and finally in 2018 Rengit became an opposition member, and in 2020, owing to a political storm, it changed into a government together with 27 strategic partners. This sitting is indeed special. This sitting is calm and orderly, and I have for the first time seen that in this sitting no one has stood up to show the House Rule Book. (Laughter in the House).

SpeakerEN

The sitting is not over yet, Honourable Member. But what does this have to do with your Housing Committee, Honourable Member?

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Peaceful and calm, Mr Speaker. And, Mr Speaker, this sitting is also full of expressions of gratitude from our strategic partners and from the government. What is unique, Mr Speaker, is that there is a Speaker from another party, a Deputy Speaker from another party, a government of another party, yet we are able to sit calmly and orderly. Hopefully this will become a historical record and a good example to future generations. All of this is because...

SpeakerEN

After this, if the government changes, we will appoint the Honourable Member as Speaker then, won't we?

Tuan Haji Ayub bin JamilUMNO · BNChairman of the Committee on Housing and Local Government · RengitEN

Yes, Honourable Member, God willing. I will go with whatever is best for you, Honourable Member. All of this is due to the openness and professionalism of our Honourable Menteri Besar, the Honourable Benut, and the cooperation of all parties, especially our strategic partners. Let us pray that it lasts and endures until the 15th General Election (PRU Ke-15). Cross-party politics in this country, Honourable Member, Mr Speaker, has not yet become a culture. Mr Speaker, but I am confident we can move in that direction because this is something new. Mr Speaker, I myself was once condemned, challenged and questioned when I invited teachers from PAS to work with me in the Excel Rengit education task force in 2006. Sixteen years ago, Mr Speaker, some parties disputed my action at that time, when BN swept clean all these seats. But I had already begun cross-party politics, Honourable Member. And I have not been awkward in handling cross-party politics from 2006 until now, and I am confident that we in Johor can begin this. I do not talk about it, I do not make speeches, but I have been doing this since 2006.

Mr Speaker, I would like to record my thanks to the Honourable Members for Sri Medan, Bukit Pasir, Bekok, Yong Peng, Permas, Buluh Kasap, Panti, Tanjung Surat and Tangkak for the matters raised relating to my portfolio. The issues or matters raised can be summarised by me as follows: first, the issue of licence applications; second, the issue of SME and industrial business; third, the issues of road infrastructure, drainage and local authority facilities, and hall facilities in local authority areas; and

fourth, concerning SOPs and enforcement, and finally, concerning housing related to PPR.

Mr Speaker, I will answer based on the 5 headings raised. The Honourable Member for Sri Medan asked that local authorities simplify business regulations for those applying for licences, as well as other regulations that are seen to burden the people, especially small traders. For the information of this august House, the approval for types of business licence that are not high-risk takes only one day, Mr Speaker, and high-risk ones take 30 days. Meanwhile, for some local authorities, they issue temporary permits to trade or temporary licences. On the part of the local authority, the Iskandar Puteri City Council (Majlis Bandaraya Iskandar Puteri, MBIP) is currently in the process of digitising licence applications online using the e-PBT system. Another matter, Honourable Member, is that the local authorities allow traders who do not have licences to trade, provided they can ensure traffic safety, parking, and that their business premises are clean, as I emphasised yesterday. I will also ask the Johor Local Government Division (Bahagian Kerajaan Tempatan Johor) to review the methods and standards for licence applications so that they can be harmonised across the 16 local authorities.

Mr Speaker, next, the matters raised relating to SME and industrial business, as voiced by Bekok, Bentayan, Buluh Kasap and Tanjung Surat. The Honourable Member for Bekok touched on negotiations or any plans and efforts that can be undertaken by the state government in helping industry, especially small traders, to face the challenges of this Coronavirus. For the Honourable Member's information, the state government and the local authorities are always mindful of the challenges faced by all affected parties. Several discussions and negotiations have been held with the stakeholders such as FMM, Federation of Malaysia Manufacture, American Chambers, the Furniture Association and several other parties, discussing the problems in the manufacturing industry facing constraints from SOPs and vaccination.

On 13.9.2021 (Friday) last week, I, together with the Deputy Minister of Plantation and Commodities, accompanied by the Johor State Executive Councillor for Domestic Trade, Pemanis, met with the Muar Furniture Association to discuss these constraints of SOPs and vaccination. Apart from compounds, let me clarify this, that are imposed by the local authorities under Act 342, there are furniture factories that are not operating but still received summonses. This has been widely complained about in the Muar area, Mr Speaker. As we know, the furniture industry contributes RM10 billion in furniture exports overseas, and of the RM10 billion, RM7 billion comes from Johor, namely from Muar and also Batu Pahat. So, the contribution of the furniture industry sector is important, and we will continue to listen and negotiate with the industry captains on how we can help this industry pick up more quickly in the future. They also face subcontractors whose factories do not comply with local authority conditions and whose workers' housing does not comply with Act 446, Mr Speaker. But the state government will look into this matter to ensure the furniture industry in the state of Johor can continue to survive and make a major contribution in Johor.

Mr Speaker, another matter I want to mention is regarding permission to operate in this manufacturing industry. Beginning 20 August, Mr Speaker, we have allowed this furniture industry to operate according to the level of full vaccination of workers, and its operation depends on the number of fully vaccinated workers. If it is 40%, it can operate at 60%; if 60% to 80%; if 80% to 100%. And I have asked the local authorities to provide assistance so that this manufacturing industry can operate according to the SOPs that have been determined by the National Security Council (Majlis Keselamatan Negara, MKN).

Mr Speaker, another matter raised by Buluh Kasap concerns small traders post-COVID: what efforts have been made by the government

to help small traders post-COVID? We have arranged to provide business spaces in more strategic locations, lighting and water facilities, apart from organising courses, food handling, standardising tables and also umbrellas so that they can be more tidy and orderly, as well as proposals to provide face masks and face shields that can help traders' self-control. Apart from that, basic digital programmes suited to the post-pandemic environment, so that our traders are friendly and easily understand. We will roll out these digital programmes with small traders in stages.

Mr Speaker, next, to the Honourable Members for Skudai, Yong Peng, Panti and Tangkak who raised matters on infrastructure, roads, drainage and facilities in local authority areas. The resurfacing of Jalan Sejahtera: MBIP informed that several criteria were taken into account in resurfacing the road. This road is a main road near a school, SMK Desa Skudai. The Roadness survey carried out found that the road surface is rough, full of patching marks, and there is a need for maintenance to ensure the safety of users. But I took the view from Skudai to ensure that only roads... priority must be given to damaged roads. Priority must be given to damaged roads first, and only then can we give attention to roads that may not be so urgent to maintain if the budget is sufficient.

In response to the question from Panti, the Kota Tinggi District Council is upgrading the infrastructure of the Panti State Assembly constituency. Drainage works in Taman Kemang at RM200,000.00, in Jalan Abdul Aziz at RM200,000.00, and monsoon drain cleaning works in Zone 3 with an allocation totalling RM1.1 million.

Madam Speaker, the Honourable Member for Yong Peng, who constantly raises issues relating to flooding in Taman Damai Jaya and also Taman Desa. I notice the Honourable Member for Yong Peng often WhatsApps. For the information of this august House, the developer has been directed to upgrade the outlets in the retention pond, the Drainage and Irrigation Department (Jabatan Pengairan dan Saliran, JPS) has also carried out cleaning works on the retention pond in Taman Damai Jaya, and JPS will also carry out periodic maintenance in 5 rounds starting from July to November. The Yong Peng District Council is planning to upgrade the cross culvert at Jalan Labis and to build drainage leading to the Sungai Temehel to accommodate the flow of the monsoon drain.

Seeing the sincerity of the Honourable Member for Yong Peng, who often brings up this issue, God willing, in this august House, I, together with the Yong Peng District Council and the Honourable Member for Yong Peng, will sit down and discuss on site how to proceed together with the other departments and agencies, and I ask the Honourable Member to give me a little time, perhaps in this September we will go to the site.

The Honourable Member for Tangkak proposed that in this House, local authority halls within local authority areas be used as Quarantine Centres. The local authorities welcomed this to facilitate management. This proposal is good because we are optimising existing logistical facilities. The use of halls in local authority areas as quarantine centres is, Honourable Member, subject to the Health Department together with the District Disaster Committee and approval by the State Disaster Management Committee. The local authorities have no objection and are always ready at any time to ensure halls in local authority areas are used to facilitate the management of quarantine for those who are infected.

Mr Speaker, regarding flash floods in the jurisdiction of the Pasir Gudang City Council (Majlis Bandaraya Pasir Gudang, MBPG), MBPG informed that it always provides cooperation, and the Sapua Global concession to constantly refresh existing drains so that they are always in good condition, as well as carrying out detailed studies to upgrade these facilities. Another matter, Permas raised the issue of illegal factories operating in the City Council area. For the information of this august House, at present, the state government has approved the exercise for 15 local authorities under the Industrial Whitening Programme in

the state of Johor. Taking as an example the Batu Pahat Municipal Council (Majlis Perbandaran Batu Pahat), which has obtained SPC and MMK approval this year. In Batu Pahat there are 800 factories, MPP that do not exist, which are trying to be legalized, which will be legalized, except for those involving water pollution, odour and noise, which will be relocated to an industrial park to be determined, and we hope this programme, Honourable Member, for the MBPG area will generate income of RM51 million and annual revenue of RM6 million. We hope all 15 local authorities will carry out the exercise this year and it is expected that by the middle of next year, all local authority areas where industries and factories that have existed for a long time can be granted approval, given permission, and they can operate more comfortably and help the economy of this state, Honourable Member.

Mr Speaker, the final issue raised by Tanjung Surat concerns the PPR Pengerang at Kampung Punggai. For the information of the Honourable Member for Tanjung Surat, there are 300 units, the area is 7 acres, 7 acres, expected completion date 24 September, this month, Honourable Member. But looking at the progress at the site, it is only 43%, it has received two EOTs, and the project is expected to be handed over to the State Secretary's Housing Division (SUK Bahagian Perumahan) on 12 July 2022. And if this project is completed, Honourable Member, we will give priority to the 126 people who are living in transit homes, and the remainder we will give priority to local residents who have no house and no land, for us to place them in the PPR Pengerang project, Mr Speaker.

Finally, Mr Speaker, allow me to briefly explain my portfolio. Firstly, regarding PLANMalaysia. Now we are working to ensure that under the Fourth National Physical Plan (Rancangan Fizikal Negara Ke-4), we want to ensure that the East Coast Highway from Kuantan will pass through Mersing and go down to Ulu Tiram. This we will work on, to ensure it is included in the National Physical Plan. Second, what we are focusing on is the West Coast Highway, from Banting to Ayer Molek and then continuing down to Gelang Patah. Both these highways, Mr Speaker, if they can be given priority, will have a major impact on the state of Johor. Likewise with drainage infrastructure, Mr Speaker, concerning the drainage infrastructure in West Johor that has not been maintained for 30 years. If possible, we should include it in the Fourth National Physical Plan.

Mr Speaker, in the Housing Division, I want to explain that there are 160,000 housing units that could not be built. We have to take an approach that is win-win, or, with permission, a win-win situation for the developers, for the government and for the house recipients. Mr Speaker, we must build houses that have quality, with permission, and that have value. This is what we are currently thinking about, to ensure that the houses occupied are comfortable.

Lastly, Honourable Member, in the Local Government Division, we have drafted directions, six directions. First, clean, tidy and beautiful cities; sustainable, smart and safe cities; green cities; liveable cities and an inclusive urban community; cities with an active economy; and cities managed professionally with their own finances. Those are the six directions being formulated by Local Government for every local authority to ensure Johor's towns are in line with the SDGs, in line with the Johor Sustainability Plan (Pelan Mampan Johor) and the Seven Amanah Johor Initiatives (Tujuh Ikhtiar Amanah Johor). God willing, we move towards that. That concludes my explanation. Any question I do not answer, I will answer in writing. Rengit prays that this august House continues to be calm and orderly as it is today, in line with the command of Duli Yang Maha Mulia Tuanku.

A pantun for the Honourable Mr Speaker: A bird flies, the hawk bird, Perches on the branch of a mighty tree, Wise Honourable Mr Speaker, always remembered, Will be remembered for all time.

Rengit supports the motion brought forward. That is all, thank you.

Deputy SpeakerEN

I invite the Honourable Chairman of the Health and Environment Committee.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Peace and prosperity to Johor. First, I would like to record my respectful thanks and deepest gratitude for the visit of His Royal Highness Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Ta'zim, to this honourable House to officiate at the opening of the Fourth Meeting of the Fourteenth Johor State Legislative Assembly. I also extend my highest appreciation and thanks for the opportunity given to me to take part in the winding-up session of the debate at the First Meeting of the Official Opening of the Fourth Meeting of the Fourteenth Johor State Legislative Assembly.

This morning I also take this opportunity to extend our millions of thanks to our frontliners, who know no fatigue and are willing to sacrifice their time and energy in service to our beloved country. I understand that they often have to leave their families at home and stay awake while all of us are sleeping, yet our frontliners have never once neglected the responsibilities entrusted to them.

On 15 June 2021, the government announced the National Recovery Plan, which is a phased strategy for exiting the crisis of the COVID-19 pandemic. Various recovery efforts are underway, as planned, to enable the state of Johor also to move out of the first phase of the National Recovery Plan so that all of us can return to normal daily life. Among the key strategies emphasised by the state government in managing this pandemic is ensuring that as many of Johor's population as possible are vaccinated. Achieving herd immunity among the people of the state of Johor will help more people be protected from more severe infection. The burden on the public health system will be reduced, and more economic and social sectors can be opened in stages.

As of 5 September 2021, the state of Johor has been able to achieve a first-dose injection level of 2,285,728 doses, which is 60.5% of the state's total population, and 1,451,390 persons have completed two doses, which is 38.4% of the total population. Meanwhile, for the adult target of those aged 18 and above, the state of Johor has achieved 84.3% first doses and 53.5% completed second doses. Recently, COVID-19 cases in our country, particularly in the state of Johor, have, Johor in particular, been quite a matter of concern for all of us. The number of daily COVID-19 cases keeps increasing by the day. In addition, on the threshold of this recovery, we are facing a dilemma of crisis. With vaccination coverage of 50% and above, half of Johor's state population remains vulnerable to infection, while the other half that has been vaccinated has begun to become complacent about their responsibility to ensure risk reduction of transmission when they are among communities that do not yet have herd immunity.

Statistics as of 5 September 2021 show that the state of Johor recorded an increase of 2,165 cases, bringing the cumulative total to 149,358 cases. This situation must be addressed carefully, especially in our efforts to revive the economy as quickly as possible. Now is not the time for us to be complacent about the responsibility given to us as leaders; as leaders, we must stand together, shoulder to shoulder, to help curb the spread of COVID-19. Therefore, the state government of Johor, through the Johor State Health Department, has decided to implement the Leader Advocacy Initiative Programme (I-PAC). The programme, based on risk communication, aims to create responsible community leaders who mobilise the community to take measures to protect individuals, families and communities. Leaders will act as a medium to assist in the activities carried out by the Health Department and the state government of Johor in curbing the spread of COVID-19 in the state of Johor. In this regard, the direct and active involvement of leaders, Members of Parliament and State Assemblymen, community leaders, and heads of institutions or organisations in society is appropriate, where they can act as agents of change in health behaviour that prioritise the agenda of fighting COVID-19 in their communities. We, all of us, must give priority to this at every level of society.

Mr Speaker, in response to the issue raised by the Honourable Member for Parit Raja regarding strengthening health facilities. In the context of the COVID-19 pandemic, the Health Department faces great challenges, not only in the management of COVID-19 patients but also in continuing to provide the best health services to all the people of Johor. Towards that end, well-considered planning was carried out at an early stage to increase the capacity of the services required. The digitalisation of the health service delivery system is among the department's initiatives to ensure patients' access to services. Online appointment systems, online health screening activities and virtual consultations give patients the opportunity to reduce their presence at locations at risk of COVID-19. This initiative has been reinforced by the value added service programme, namely at the pharmacy division level, which provides medication collection services through outreach or drive-thru, and has increased patients' access to the primary health service system in the context of COVID-19.

Private sector participation, especially during the pandemic period, has also been emphasised, where there are 15 hospitals that have also helped in managing COVID-19, with 123 dedicated COVID-19 ordinary ward beds and 14 ICU beds. In addition, private clinics have been empowered under Act 342, where 54 private clinics are capable of providing CAC and Home Surveillance Order services.

Mr Speaker, the presence of Variants of Concern in the state of Johor has also contributed to the increase in cases, where, as of 5 September, 19 cases of the Delta Variant of Concern have been reported in the state of Johor. It is indeed worrying to see the high COVID-19 mortality rate of 10.9% of the total deaths in all of Malaysia. Most COVID-19 deaths occurred among vulnerable groups, namely the elderly and those with comorbidities. Among the main contributing factors to these deaths is delay in seeking treatment, where many had shown symptoms several days before seeking treatment. Therefore, it is hoped that leaders should remind people with comorbidities to look after their health and ensure that they stay away from the risk of infection. The R-Naught COVID-19 transmission rate is the transmissibility of a virus at the beginning of an outbreak in the community. As the Honourable Member for Parit Yaani stated, it is high due to the increase in cases throughout the country. What is more important here is that this rate shows a downward trend, where the rate fell from 1.14 on 1 August to 1.10 on 5 September 2021. The COVID-19 transmission rate as shown by R-Naught should be taken as a reminder to the public to remain vigilant in preventing COVID-19. Free movement within the community and non-compliance with SOPs have become the main causes of transmission among communities today.

The Honourable Member plays an important role in preventing transmission by conveying correct information to the community so that they can take the right action in protecting themselves, their families and their communities from being infected with COVID-19. Based on the current COVID-19 situation, with high rates of comorbidity and mortality, the state government together with lead departments always prioritises preventive and control measures as well as the management of COVID-19. The state of Johor has an efficient, coordinated and united COVID-19 governance structure through the State Security and Health Committee and the District Disaster Management Committee. Collaboration between government agencies, the private sector and volunteers has strengthened the system for delivering COVID-19 management activities in the state of Johor. Preventive measures are also complemented by continuous enforcement actions by agencies that have already been empowered under Act 342. The use of the MySejahtera system helps in focusing on high-risk locations in enforcement

activities. Compliance with SOPs has become the main focus of the enforcement activities carried out. In addition, the state government has adopted the approach of implementing the Johor Industrial Preparedness Plan (JIPP) programme for industries, which emphasises the actions that industries need to take in preventing COVID-19.

Mr Speaker, the issue debated by the Honourable Member for Bukit Pasir, Bentayan, YB Serom, regarding the Persiaran Agas cluster. In fact, this factory is a semiconductor manufacturing plant. The factory has a total of 4,057 workers, the majority of whom, 3,806, are local workers residing in Tangkak, Muar and Jasin, while 251 are non-citizen workers. The first case reported in this cluster was a factory worker who began showing symptoms, namely fever, on 24 June 2021, but still continued to work until 28 June 2021. Examination and RT-PCR swab testing at the health clinic confirmed that he was positive for COVID-19 on 2 July 2021. Following that, a representative of the Tangkak District Office conducted an investigation at the factory on 2 July 2021, and the results of contact tracing and screening found that several more cases involving factory workers had been identified. As of 28 July 2021, the total number of cases reported in this cluster was 492 cases. Of this number, 207 were factory workers, of whom 155 were citizens while 52 were non-citizens. A further 255 cases were reported among family members and acquaintances of the factory workers.

A total of 13 deaths have been reported so far. Almost all of these deaths were reported to have comorbidities or chronic illnesses and delayed seeking treatment, with an average of 4 days from the onset of symptoms to the date of receiving treatment. Following the high number of cases and deaths, the State Health Department followed up on the preventive and control measures implemented in this cluster. Among the actions was the closure of the factory on 3 July for the purpose of investigation and sanitation activities. In addition, the factory was again closed in its entirety from 14 July to 20 July 2021. A risk assessment of the factory environment for the purpose of reopening the factory was carried out during that period. A total of 2,501 COVID tests were conducted, and, as I said earlier, 492 positive cases were identified. As of 20 July 2021, a total of 1,495 factory workers were ordered to undergo quarantine because they were suspected to be close contacts. The quarantine period was extended to 21 days in view of the high number of deaths, which raised the possibility that Variant of Concern cases were involved. The last case reported on 28.7.2021 was among those who were still in quarantine.

Mr Speaker, the issue raised by YB Jementah regarding the percentage of sporadic COVID-19 cases. Sporadic cases are an indicator of transmission within the community. As of 31 August 2021, 28,798, or 20% of sporadic cases, were reported out of 1,386,47 COVID cases that had been reported in the state of Johor. Of that total, 52,459 cases were reported to have symptoms, in line with the data reported by the Ministry of Health Malaysia. This significant number provides the input that targeted screening needs to continue, especially in high-risk locations. As of 5 September 2021, more than 2.3 million tests have been conducted, with a positivity rate of 11.7% compared with 7.68% in Malaysia. This is a figure that can be used for planning the next actions, because it reflects the still high level of transmission in Malaysia. In view of this high rate, the state of Johor has also implemented high-risk group testing and enhanced community surveillance, namely with permission, enhanced community surveillance as an additional targeted testing measure. The number of tests conducted, for example from 1 to 31 August 2021 alone, was 626,247 tests, which is between 15,000 and 20,000 tests a day in the state of Johor. With the continuing and prolonged number of cases, it is time for the state of Johor to also accept the fact that the COVID-19 disease will become an endemic disease, where infection remains in the population even without being introduced

from outside. Towards that end, the planning of a new normal way of life needs to be instilled at all levels of society, including in the economic sector.

Mr Speaker, the Honourable Member for Skudai and several other Honourable Members have already discussed the FTTIS concept, namely Find, Test, Trace, Isolate, Support, with permission. This issue is often raised on any media platform and appears to be something extraordinary. For the information of this honourable House, the Health Department has been implementing the find, test, trace, isolate, support programme for a long time, every time it receives reports of an infectious disease outbreak. The popular name FTTIS has so far referred to active case detection activities, close contact tracing, quarantine testing and the management of COVID-19 cases. The strengthening of infrastructure and the health service delivery system for COVID-19 management was planned at an early stage. The capacity of facilities at all levels is always also given priority. The management of COVID-19 in health facilities is also part of FTTIS. All patients will be placed either in hospitals, PKRCs or home quarantine for the purposes of treatment and isolation. Taking into account the increasing capacity needs in the management of patients at PKRCs, the government has made efforts to further increase the number of PKRCs in the state of Johor, bringing the current capacity to 3,356, with 1,200 involving private PKRCs. In addition, there are 17 hotels that have been used as quarantine stations to accommodate those suspected of being infected. At present, most hotels are being used to accommodate travellers arriving from overseas.

Mr Speaker, the Honourable Members for Penawar, Mengkibol, Semerah, Buluh Kasap and also Johor Jaya raised matters relating to the outreach programme in the vaccine administration process. They also raised the issue of increasing vaccine reception and administration centres. The government has made efforts to increase vaccine administration capacity by increasing the number of vaccination centres throughout the state of Johor. At the early stage of the National COVID-19 Immunisation Programme (PICK), there were only 14 PPVs, large halls opened throughout the state of Johor, with a total of only 65 PPVs. However, by September, a total of 241 PPVs had been opened in the state of Johor, comprising 23 public PPVs, 10 mobile PPVs, 7 special PPVs, special PPVs at government hospitals, 156 general practitioner PPVs, 20 private hospital PPVs, 15 integrated PPVs and mega PPVs, and 10 industrial PPVs. The opening of mega PPVs has increased vaccination capacity to 78,500 doses a day. The state government has also directed the mobilisation of civil servants and volunteers to ensure the success of PICK in the state of Johor. With the establishment of 241 vaccination centres throughout the state of Johor, with a vaccine injection capacity of 78,500 a day, it is seen as able to meet the vaccine administration needs in all districts within the state of Johor. Outreach or reach programmes have been carried out by mobile teams in every district for communities in rural areas, Orang Asli villages, homes for the elderly and bedridden patients, including FELDA areas, for vaccination purposes. Mobile vaccine administration has been carried out by the Mobile PPV teams in every district, particularly for bedridden persons, rural areas, homes for the elderly, Orang Asli and so on. For rural locations, these Mobile PPVs are implemented taking into account input from local leaders. As of 5 September 2021, a total of 182,036 persons had been vaccinated by mobile teams throughout the state of Johor.

The issue of giving appointment dates for receiving the COVID-19 vaccine is handled by the MySejahtera team. However, community leaders and leaders can help obtain lists of names that have been missed and register on MySejahtera so that vaccination appointments can be given. This programme is also implemented together with NGOs such as Mercy, and government agencies such as IJN and so on.

Mr Speaker, I would also like to state here that walk-in vaccination has also been implemented in several districts such as Kulai, Kota Tinggi, Segamat, Tangkak, Muar, the Batu Pahat district, the Pontian district, the Mersing district and Kluang, however, not at all PPVs but at selected PPVs only. That list has already been published, and please refer to that list. Integrated PPVs operate

based on the capacity approved by the Federal CFTF. However, there have been several applications by district CFTFs to upgrade PPV capacity, and these have been approved by the Federal CFTF. For example, the PPV at Dewan Muafakat Taman Adda Height, Johor Bahru has been upgraded from a capacity of 1,500 to 2,500. Meanwhile, the PPV at the LHDN Hall in Kluang has been upgraded in capacity from 1,500 to 2,500. When there is an increase in capacity, operating hours will also change, and there is a possibility of operating until 9.00 pm. In early May 2021, during Phase 2, PPVs were opened based on MySejahtera registration, mostly concentrated in urban PPVs. That number has been increased from time to time. As of now, as I stated earlier, 241 PPVs have been opened throughout the state of Johor and have achieved the targeted coverage.

Mr Speaker, the weekly and uneven distribution of vaccines sometimes causes lower-capacity public PPVs to be closed to make way for the implementation of mega PPVs that run more smoothly and continuously. This is to facilitate a more effective concentration at one location in the city. The closure of these PPVs does not affect the appointments of residents at the related PPVs.

Beginning in February, the number of vaccines received was 25,740 vaccines out of the total number of vaccines required. It then increased to 71,090 doses in March. Next, 73,710 doses in April. In May, 200,330 doses were received. 444,510 doses in June. In July, 1,334,530 doses were received. In August, 2,044,450 doses were received, and as of 6 September, a total of 519,440 doses had been received in the first week of September, and we expect this number to increase.

Deputy SpeakerEN

Honourable Member, please wind up.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Mr Speaker. There are many matters in this House. I feel almost all the YBs have raised the issue of health. I have to be briefed thoroughly, because if I don't answer them, they will sulk. So, how to answer or not answer. Answer, yes.

Deputy SpeakerEN

I will give you five minutes.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Mr Speaker, regarding the issue of medical equipment facilities at health clinics raised by the Honourable Member for Semerah, namely the maintenance of medical equipment for all health clinics in Johor falls under one arrangement, namely under the MEET Project. Under this, a company has been appointed by the Ministry of Health Malaysia to handle the maintenance of all medical equipment. So far there has been no issue regarding the maintenance of medical equipment since it is carried out periodically. However, there has been a delay when there were issues with the supply of replacement parts and so on, causing the equipment to be unable to be repaired immediately.

As for the damage to the fundus camera at the Batu Pahat Health Clinic, the equipment was reported to have been damaged on 4 February 2021, and an initial inspection was carried out by the maintenance concession company on the same day. However, the inspection found that the equipment had sustained major damage and was recommended by the original supplier of the equipment to be disposed of due to excessively high repair difficulty, excessively high repair costs and it being uneconomical to repair. Beyond economic repair Honourable Member, with permission. An application to purchase new equipment will be carried out to replace the equipment.

As for vehicle maintenance, including ambulances, it is carried out by the concession company maintaining the clinic under the clinic support services, while the others will be sent for maintenance and periodic servicing by their respective responsibility centres.

Mr Speaker. Regarding the increase in psychiatric specialists in the state of Johor. There are a number of specialist hospitals and a special institution providing psychiatric specialist services in the state of Johor. At present there are 36 psychiatric specialists in the state of Johor compared with 29 in 2020, where there were additions of specialists at Hospital Permai, HSA, Muar and Segamat. The distribution of the number of specialists by hospital is as follows: Hospital Permai 13, HSA, Johor Bahru 7, HSI, Johor Bahru 3, Hospital Sultanah Nora Ismail, Batu Pahat 3, Hospital Pakar Sultanah Fatimah, Muar 4, Hospital Segamat 5, Hospital Enche Besar Hajah Kalsom, Kluang 1.

Mr Speaker, the issue raised by the Honourable Member for Pekan Nanas, Yong Peng, Johor Jaya regarding the PKRC, namely the COVID-19 Quarantine and Treatment Centre, at present there are three public PKRCs, namely the PKRC Stadium Pasir Gudang, PKRC Olive B, and PKRC Sri Danga, with a total of 2,156 beds. According to reporting data as of 5 September 2021, a total of 1,597 patients are being treated in all these PKRCs, with the average bed utilisation rate across all PKRCs at 74%. To date, 27,179 patients have been admitted to these three public PKRCs. There is also a private PKRC, namely the DB Kompleks PKRC, with a capacity of 1,200 beds, where 9,597 patients have been treated at this private PKRC. Each PKRC, when the pandemic begins to subside, must always be prepared to be activated at any time. Based on the experience in other states that used school hostels as PKRCs, it was found to be less suitable for medium and long-term use because the use of these facilities is subject to the directive on the reopening of school sessions by the Ministry of Education. At present, as I said earlier, there are three PKRCs, and we are in the process of adding one more PKRC in the Batu Pahat district.

Mr Speaker, the issue raised by the Honourable Member for Tiram and the Honourable Member for Permas regarding congestion at the CAC in Pasir Gudang. This is due to an increase in cases. However, congestion also occurs when some residents come even though they are not positive cases or close contacts, by walk-in and without appointments, causing congestion to increase. To overcome this problem, for patients newly diagnosed as positive, they do not need to come to the CAC Pasir Gudang, but instead get access to health services virtually or online by obtaining the link at, perhaps I can mention it here, tinyurl.com/vcacjohor, where these patients will be assessed by officers within 48 hours. So with this virtual CAC, patients who are actually positive or feel symptomatic and so on do not need to come to the CAC Pasir Gudang, which is said to be crowded. Just enter this virtual link and we will contact them.

Apart from that, they also have the option to go to a CAC at a nearby private clinic. To find out which private clinic is involved as a CAC, general practitioner, they can also get it at the link I mentioned earlier. For any residents who are not close contacts of positive cases, they are advised not to go, not to go directly to the CAC Pasir Gudang. Instead, as I said earlier, they can conduct self-screening using self-test kits or get screened at any nearby private clinic. Apart from the CAC in the car park of the Pasir Gudang Indoor Stadium, the Extreme Pasir Gudang Ground has also been opened since 19 August 2021 to avoid congestion at the CAC Pasir Gudang for the purpose of assessing positive cases on the last day of quarantine and release from quarantine orders or removal of the bracelet. So after this, if they want to remove the bracelet, they do not need to go to the stadium but to the Extreme Ground in Pasir Gudang. This service is opened for close contacts for quarantine release and bracelet removal.

At present, the Pasir Gudang Municipal Stadium houses two types of services, namely the Quarantine and Treatment Centre (PKRC). Within the arena of this indoor stadium, 1,057 beds are placed solely for the treatment of COVID-19 patients in categories one and two. It operates under the supervision of the Johor Bahru District Disaster Committee. And the second, outside, we have the CAC, which is a one-stop centre for the assessment of COVID-19 patients and also close contacts, operating as I said earlier in the stadium compound.

Mr Speaker, the issue raised by the Honourable Member for Bukit Batu regarding mass screening. The COVID-19 testing activities carried out by the State Health Department adopt the early detection and containment approach through the implementation of FTTIS activities as I said earlier: find, trace, test, isolate and support, where mass testing activities have long been implemented since the second wave in the state of Johor. But it is carried out in a more orderly and targeted manner, or targeted testing not mass testing. Mass testing without planning will have a negative impact on the overall COVID-19 management system, confuse public understanding and raise risk communication issues. Mass testing, which is very impractical, requires high expenditure and usually has no major impact on transmission. Among the negative effects we see or observe is that it delays results because of the high number of tests. There is a possibility of many false negatives due to the long incubation period, and it is feared to give an impression or perception of safety in a dangerous COVID-19 situation and no preventive action by the individuals concerned, as well as the gathering of people which contributes to transmission at testing locations.

Mr Speaker, the government has decided, taking into account the high number of arrivals of travellers through the Johor international entry points, that applications to undergo mandatory quarantine at home or a residence will from now on be processed by the Johor State Health Department. All applications must be submitted to the email address [email protected] at least seven days before arrival in Malaysia. The risk assessment of travellers is made based on the application for quarantine at home or residence that will be carried out. A home or residence may be considered for use as a mandatory quarantine place if it meets the following conditions: travellers, both citizens and non-citizens, who have a house or residence in Malaysia, a fixed address, namely including PRs or those in the MM2H category and workers. They must also test negative in the COVID-19 infection detection screening test, namely an RT-PCR test must be carried out. Travellers must also have received, or should have received, two doses of the COVID-19 vaccine, and their home or residence must be suitable.

Individuals who have completed vaccination are individuals who have fulfilled the following criteria. For vaccine types that require two doses of injection such as Pfizer, AstraZeneca, Sinovac and so on, the individual must have passed the 14th day from the date of the second dose injection. That's mean, only after 14 days can they apply. For vaccine types that require only one dose such as CanSino, Johnson & Johnson and so on, they must have passed the 28th day from the date of injection.

Mr Speaker, I will finish shortly but there are a few more issues. The issue raised by the Honourable Member for Perling regarding the problem of communication or sharing of information on specific info to foreign nationals.

Honourable Member, the Health Department has issued several books and pamphlets related to Industrial Workers COVID-19 Care for foreign workers working in this state, especially in the state of Johor, and among the books contained in five languages, namely in English, Chinese, Burmese, Nepalese and Vietnamese language, there are 5 types of books that have been issued for the use of foreign workers.

Mr Speaker, the proposal put forward by the Honourable Member for Penggaram which raised questions regarding the death rate of pregnant mothers due to COVID-19 and also regarding those who have already received injections. For the information of this august House. As of 6 September 2021, a total of 18 pregnant mothers have died due to COVID-19 infection in the state of Johor. The number of pregnant mothers who have received the first dose of the vaccine is 30,000, while those who have received the second dose is 9,177.

Next, the Honourable Member for Penggaram also asked about the current situation regarding non-citizens receiving the vaccine. In fact, the target of the Department of Statistics Malaysia for the state of Johor, the number of vaccine recipients, is 2.7 million adults aged 18 years, and this number already includes citizens and non-citizens. So, according to the guidelines of the COVID-19 Immunisation Programme issued on 16 February 2021, vaccination will be given free of charge to all citizens and non-citizens.

Mr Speaker, I have generally concluded the issues related to health, but there are some issues related to PERHILITAN (Department of Wildlife and National Parks). So, this elephant issue also needs to be discussed.

Deputy Speaker

Boleh dijawab...

Tuan Haji Aminolhuda bin HassanAMANAH · PHParit YaaniEN

Mr Speaker, I ask that it be postponed or stopped. Because we will end at 1.00 noon, 1.30. Give the opportunity to the Honourable Menteri Besar to give a clearer answer. Thank you.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

As for the PERHILITAN issue, I will send a written response to the relevant YBs. Thank you.

Deputy SpeakerEN

Honourable Member, if there are those that have not had time to answer, answer them in writing to the YB who raised them.

Tuan Vidyananthan a/l RamanadhanMIC · BNChairman of the Committee on Health and Environment · KahangEN

Ok, Mr Speaker. So, in conclusion, I once again extend my heartfelt thanks for the issues that have been raised by the Honourable Members. As the EXCO for Health and Environment, I am proud of the departments and teams under my portfolio in the situation of the COVID-19 pandemic, the duration of which is unknown. They work hard without knowing fatigue, and I appreciate their sacrifices. I would also like to take this opportunity to thank everyone and all government agencies for their cooperation, support and assistance that has been given, whether at the state or federal level.

I also take this opportunity to thank the Honourable Members who have touched on matters falling under my portfolio. I have tried my best to give answers to all the issues raised. However, if there are matters that have been overlooked, follow-up action will be taken by my heads of department. May everything that is knotted be untangled, what is murky be clarified, and what is lacking be added. That is all, thank you.

Deputy SpeakerEN

Invitation to the Honourable Chairman of the Committee on Agriculture, Agro-based Industry and Rural Development. 20 minutes.

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you, and the mercy and blessings of Allah, and greetings of prosperous Johor. Honourable Madam Speaker, first, your servant wishes to record a respectful address, with the utmost gratitude, for the royal presence of Duli Yang Maha Mulia Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Ta'zim, in this august House to officiate at the Opening of the Fourth Session of the Fourteenth Johor State Legislative Assembly. At the same time, I also extend my heartfelt thanks for the opportunity to take part in the winding-up of the debate on the motion to give thanks for the royal address of His Royal Highness the Sultan of Johor. I extend my heartfelt thanks to the Members of the State Legislative Assembly who have touched on and raised issues concerning the agricultural sector and rural development in the State of Johor.

Honourable Madam Speaker, generally speaking, the COVID-19 pandemic has affected the world economy, and Johor has not been spared from its impact. In 2020, Johor's economic growth contracted by 4.5%, compared with a contraction of 5.5% in Malaysia's economic growth. Generally in Johor, the agricultural sector was the only sector that recorded positive growth, at 3.1%, whereas the other sectors in Johor recorded contractions. This growth is the result of the government's emphasis on efforts to strengthen the agricultural sector. And, agro-food is in line with what has been conceived through the Makmur Johor initiative.

On this occasion, I, on behalf of the State Government, wish to extend my heartfelt thanks to the farmers, planters, livestock breeders and fishermen across this State, who are the frontliners of the country's agricultural and agro-food sector. They are the agricultural heroes who always play a role in ensuring that the national food supply chain remains sufficient, no matter what the circumstances. This development is also in line with the government's approach, which has placed the agricultural sector and its chain as an essential sector, with permission, throughout the period of the Movement Control Order (PKP) and up until the period of the National Recovery Plan (PPN). Subject to the Standard Operating Procedures (SOP) of the National Security Council (MKN). Therefore, the government has ensured that these sectors continue to operate without any disruption throughout the period of the Movement Control Order or throughout the period of the National Recovery Plan. To guarantee the continuity of the economic chain and of the entrepreneurs involved, the State Government has also emphasised and ensured that the departments or agencies involved at state level accommodate and facilitate entrepreneurs as far as possible in the process of obtaining letters confirming participation in the agricultural sector.

Up to August 2021, I am pleased to inform you that the departments and agencies at the Johor State Government level, particularly under the Ministry of Agriculture and Food Industries (MAFI), have issued 11,339 letters of confirmation. This matter is important to guarantee the smooth running of all activities within the network and chain of the agricultural sector by entrepreneurs. Generally and in reality, the agricultural sector can be said to have been less affected compared with other sectors. Agricultural and food industry activities have continued to operate throughout this pandemic period. However, the problem that disrupted part of the agricultural sector chain, particularly in the agricultural sector during the COVID-19 pandemic, is in terms of marketing, as raised by the Honourable Member for Parit Yaani and the Honourable Member for Bukit Naning.

For the information of the Honourable Member, although activities and the movement of vehicles carrying agricultural produce were permitted, the bigger issue was the very limited market space before this. When most farmers' markets and night markets were forced to stop operating, restaurants and food stalls that only operated on take-away basis, and gatherings and celebrations were not permitted.

For the information of the Honourable Member, generally, in efforts to strengthen the agricultural sector, the State Government sees the need to lead the food industry as a whole. That is, not only the production or supply of food but the entire food value chain, including marketing. In this context, the State Government consistently emphasises that agencies which function as marketers of agricultural produce continue to strengthen their role. For example, the Johor State Farmers' Organisation Board has intensified and activated the operations of 27 Agricultural Produce Collection Centres (PPHP) and outlets of the District Farmers' Organisations (PPK) across the State of Johor, in collecting and marketing the agricultural produce of farm entrepreneurs throughout the COVID-19 pandemic season, starting from 2020 until now.

As of 31 December 2020, the PPHP of the District Farmers' Organisations had marketed agricultural produce worth RM32.71 million in 2021 up until June, up until the month of June 2021. The marketing of agricultural produce amounted to RM17.017 million. The total marketing of these agricultural products involved 766 producers and entrepreneurs who are members of the Farmers' Organisation itself. Through FAMA, there are various programmes aimed at enhancing the development of the agricultural sector, particularly in the aspect of marketing. Among them are the operation and management of FAMA marketing service centres, controlled farmers' markets (PST), digital marketing, the FAMA contract farming programme, and FAMA also organises programmes or courses to improve skills in the marketing of agricultural produce and basic agricultural industries, targeted at 200 entrepreneurs this year. Overall, FAMA has successfully marketed products worth RM37.22 million up until June 2021.

Honourable Madam Speaker, regarding the issue of the glut of pineapples as raised by the Honourable Member for Bukit Naning. The types of pineapples affected at this time are the Morris and Josephine varieties. Morris and Josephine pineapples are widely used in cooking and as fresh food. The constraints and continuation of the Movement Control Order (PKP), up until now, in which events and feasts could not be held, are among the factors that have caused the reduced demand for Morris pineapples. The Malaysian Pineapple Industry Board (LPNM) has taken several initiatives to assist growers affected by the impact of COVID, this COVID pandemic. Among them are making marketing matches with wholesalers within Johor and outside Johor. And secondly, purchasing pineapples through the promotion allocation of the Johor pineapple promotion campaign. Thirdly, matching with pineapple processing factories. Fourthly, the LPNM is also working towards transforming and encouraging growers to plant more commercial and premium varieties, such as the MD2 variety, whose demand in the market is higher and at this time there is also no marketing problem.

For the information of all Honourable Members, the LPNM as a whole has assisted growers during this PKP period by marketing 176.04 tonnes of pineapples to factories. They also marketed fruit outside the country, outside the State of Johor, amounting to 16.8 tonnes. And at the same time, they purchased fruit under the Johor pineapple promotion campaign amounting to 13.56 tonnes, and the total pineapples assisted for marketing came to 206.4 tonnes in total.

To address the problem in the future, there is the introduction of a pineapple production incentive for smallholders, for the purpose of reducing the burden of production costs or maintaining losses, so as to prevent growers from suffering losses during the COVID-19 pandemic. The incentive rate that has been set is RM300.00 for each metric tonne, with a maximum of 1,500 per participant. This is at a rate of approximately RM0.30 sen per fruit. For information, the estimated cost of planting Morris pineapples is approximately RM0.50 sen per plant. During the pandemic season, the factories only took and bought at a price of RM0.40 sen. Accordingly, the LPNM will add an incentive of RM0.30 sen, thereby bringing the total to RM0.70 sen per fruit.

Under this incentive, RM1.5 million has been allocated and the estimated number of beneficiaries is one thousand smallholders. This initiative is focused on growers affected during the pandemic period through added sales value to avoid losses at this small-scale grower level. Generally, this means that every grower will get to enjoy the profit from the pineapples marketed. This means that this incentive becomes an alternative for growers to sell their pineapple produce to factories while enjoying the incentive from the Malaysian Pineapple Industry Board. This is among the reasons why farmers need to register and build good relations with the relevant agencies.

Therefore, my advice to entrepreneurs and agro-food entrepreneurs is to always establish cooperation or engagement with the relevant agencies in the districts. Not only when facing problems but at all times, in order to obtain the various facilities and benefits from these agencies. At the same time, there is also an emphasis on the agencies to always carry out outreach programmes to reach out to and engage with entrepreneurs and farmers. It is hoped that the Honourable Members can cooperate in placing emphasis on this matter when meeting with entrepreneurs and agricultural entrepreneurs in their respective areas.

Honourable Madam Speaker, the Honourable Member for Bukit Pasir raised the issue of the slaughter SOP during Hari Raya Korban, which is seen as very strict and burdensome to livestock breeders. For the information of all Honourable Members, the slaughter SOP for Hari Raya Aidiladha in 2021 was based on the COVID status in the State of Johor at that time, when the State of Johor was in the first phase, Phase 1 of the National Recovery Plan. In line with the current situation of COVID-19, there was still an increase in high case numbers at that time. Therefore, the SOP needed to be tightened to contain the outbreak. The Johor State Veterinary Services Department, in cooperation with the Johor Islamic Religious Affairs Department, prepared the SOP on their respective sides, based on the SOP issued by the MKN dated 23 June 2021. This matter is in line with the MKN's directive to reduce the risk of COVID-19 infection among sacrificial participants.

Workers and operators of slaughterhouses, the slaughter centres themselves, and at the same time reduce the emergence of slaughterhouse clusters. Slaughterhouses and slaughter centres have been briefed on the SOP prepared by the Johor State Veterinary Services Department and the Johor Islamic Religious Affairs Department on 20 June, and a question-and-answer session has also been held. Apart from that, these slaughterhouses and slaughter centres have two important matters that are monitored by this department in slaughtering, including aspects of slaughtering, including food safety for consumption, control of pollution from disposal of slaughter waste, and animal welfare and control of the spread of infectious diseases in livestock. The three main principles of the Veterinary Services Department's slaughter SOP emphasise food safety, pollution, and also animal welfare.

Honourable Madam Speaker, departmental records have shown that every year outbreaks of foot and mouth disease (FMD), penyakit kuku dan mulut, occur because of the high movement of livestock due to demand for sacrificial cattle. In April 2021, an outbreak of lumpy skin disease (LSD), penyakit kuku berketul, spread into our country through the entry of livestock for slaughter purposes imported from the north of the Peninsula. The Department has the role of controlling the entry of diseased livestock, therefore pre-slaughter inspection or ante-mortem inspection is needed to monitor whether there is movement of livestock showing clinical signs of LSD, and with the existence of slaughterhouses and slaughter centres in the State of Johor implementing the SOP, the spread of LSD can be curbed and reduced.

Honourable Madam Speaker, the Honourable Member for Endau raised the issue of trawl net intrusion in the Zone A fishing area in Mersing. For the information of the Honourable Member, based on records there are 902 fishermen who fish in Zone A off the coast of Mersing. Apart from that, the Mersing district has a total of 160 licensed trawler vessels. The Fisheries Department is very committed to ensuring that fishery resources continue to be preserved. Among the enforcement activities of the Fisheries Department are general patrol activities across the waters of eastern Johor or at the border of Mersing up to Johor–Pahang. Secondly, micro patrol activities at jetties and landing points, and micro patrol activities to monitor the seabed, and subsequently inspection activities for compliance with the conditions of fishing licences or vessels. According to records, the total number of arrests and investigations at the Mersing base from 2019 to 2021 relating to trawl nets: in 2019 there were 2 trawl net arrests in Zone A, in 2020, 4 trawl net arrests in the zone, and in 2021 so far, one trawl net arrest in Zone A. The State Government and the department very much welcome information from the public, particularly fishermen, in efforts to eradicate trawl net intrusion activities.

Honourable Mr Speaker, Honourable Mr Speaker, on behalf of Penggaram, the Honourable Member has raised the issue of the Special Poultry Farming Permit (PKTA). Madam, eh, Mr Speaker, I apologise. For poultry farms in the State of Johor, for the information of the Honourable Member, in fact this PKTA was introduced by the previous government through the 878th Johor State Executive Council Meeting in 2019, which agreed to the implementation of the Special Poultry Farming Permit, or PKTA. Accordingly, the current government cannot easily change that decision, and we do not know and are not confident, whether it is uncertain, whether the matter was referred or consulted with poultry industry players and so on. We are well aware that in 2020 there were 730 poultry farms in the State of Johor. This number contributed to production of 379,749.58 metric tonnes of chicken per year, equivalent to a farm-level production value of RM1.77 billion. Meanwhile, egg-laying chicken production was 174,457.01 metric tonnes per year, equivalent to a farm-level production value of RM1.017 billion. This industry sector has contributed, becoming a major contributor to the GDP of the State of Johor and Malaysia.

For the information of the Honourable Member, the government and I myself have met with the Johor Small and Medium Poultry Breeders Association and have taken note of their concerns. At the same time, the government, through the Johor State Veterinary Services Department, has held workshops and discussion sessions to facilitate the PKTA application process, involving various other relevant departments and agencies. Going forward, the government places emphasis on developing the poultry industry, particularly involving small and medium entrepreneurs, through various approaches such as contract farming and so on. I dare to state that the government will look at the matter more closely to ensure that this industry does not disappear because of problems created by the government.

Honourable Mr Speaker, regarding rural development, the Honourable Member for Bukit Pasir raised the issue of the outstanding allowance of Village Heads. For the information of the Honourable Member, the appointment of Johor State Village Heads for the 2021–2022 term has been made and took effect on 1 March 2021. The allowance for Village Heads is RM900.00, using an allocation of RM400.00 from the State Government and RM500.00 from the Ministry of Rural Development (KPLB). Payment of the Johor State Village Head allowance using the State Government's allocation has already been paid throughout the appointment of Village Heads from March until now, at RM400.00 a month. The allocation from the Ministry of Rural Development (KPLB), meanwhile, was only received by the Office of the State Secretary, Management Services Division, on 12 August 2021, amounting to RM7,383,600.000. The State Secretary, Management Services Division, has been, and is in the process of paying the arrears of Village Head allowances for March to August 2021 totalling RM1.719 million, covering 632 Village Heads in the State of Johor. In addition, the administration is also taking action to pay the arrears of secretary allowances to the JPKK for March to August 2021, totalling RM1,185.6 million for 632 secretaries, and JPKK meeting allowances amounting to RM22,700.00 and meeting operation allowances, while meeting attendance allowances amount to RM109,000.00. Payment of arrears for the Village Head allowance, secretary allowance and JPKK meeting allowances for March to August 2021 is, God willing, expected to be completed before the end of September 2021, God willing.

Honourable Mr Speaker, Honourable Mr Speaker...

SpeakerEN

Is there much more, Honourable Member?

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

Yes, a little more.

SpeakerEN

It has been 23 minutes, Honourable Member.

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

Ok. Berkenaan isu penyelenggaraan dan kerja-kerja mendalamkan Sungai Batu Pahat, Jabatan Pengairan dan Saliran (JPS) Johor telah memohon pelaksanaan projek menggali Sungai Batu Pahat di bawah peruntukan negeri 2022 dengan anggaran kos sebanyak RM4 juta sebagai penyelesaian jangka pendek. Manakala bagi penyelesaian jangka panjang ianya telah dimasukkan dalam bawah Kajian Pelan Pengurusan Lembangan Sungai Bersepadu IRBM Sungai Batu Pahat. Manakala, bagi isu penyelenggaraan isu auto gate di Batu Pahat yang dibawa oleh pihak Semerah, untuk makluman Honourable Member for Semerah, kesemua pintu auto gate sentiasa di selenggara oleh JPS dari masa ke semasa. Namun begitu, masalah sampah terapung yang banyak di saliran di sistem saliran contingency pintu air ini. Sebagai makluman, kedua-kedua pintu air ini, iaitu Pintu Air Parit Syorga Shahbandar dan Pintu Air Pagar Chondong telah diselenggara masing-masing bulan Mei dan Ogos. Masalah banjir kilat di kawasan yang dinyatakan juga adalah disebabkan kapasiti sistem saliran bandar serta ada yang tidak dapat menampung kadar hujan yang sangat lebat dan kadar aliran dari kawasan sekitar yang telah membangun.

The Honourable Member for Semerah also raised the issue of village street lights. It is informed that the guidelines for the implementation of the Kampung Street Light programme of the Ministry of Rural Development (KPLB) stipulate that 40 units of lights be installed in each main village and its network, taking into account the size of the village and the number of houses in that village. If there is a need exceeding the stipulated limit, applications may be channelled to KPLB Johor State for attention and action. However, some approvals of applications for additional village street lights (LGK) are subject to consideration at the level of the Ministry of Rural Development department.

For the information of all Honourable Members, the state of Johor has received an allocation of 8,636 LGK under the Phase 10 LGK installation programme for the years 2020 to 2021, and is the highest allocation compared to the states in Peninsular Malaysia for this phase 10. The Phase 10 LGK installation programme is nearly complete, with on-site progress approaching 97%.

Honourable Mr Speaker, overall, the state government is very committed to developing the agriculture sector and the food industry to an even higher level, alongside focusing on strengthening and developing rural communities. It is hoped that the COVID-19 pandemic will quickly recover so that we can plan and implement the development of this state and country more smoothly. That is all. May Allah grant success and guidance. Peace be upon you and the mercy and blessings of Allah.

SpeakerEN

Terima kasih kepada Yang Berhormat Pengerusi Jawatankuasa Pertanian, Industri Asas Tani dan Kemajuan Luar Bandar. Seterusnya, saya mempersilakan Yang Amat Berhormat Menteri Besar untuk menggulung perbahasan. Silakan, dijemput.

Dato’ Haji Hasni bin MohammadUMNO · BNMenteri Besar · BenutEN

Bismillahirrahmanirrahim. Assalamualaikum warahmatullahi wabarakatuh, salam sejahtera. Honourable Mr Speaker, first of all let us together extend our highest gratitude to the presence of Allah SWT, for with His abundant blessings and mercy we have been able to hold the Fourth Meeting of the Fourteenth Session successfully. As head of the state executive administration, I humbly convey my highest gratitude for the royal command to officiate by Duli Yang Maha Sultan Ibrahim Ibni Almarhum Sultan Iskandar, Sultan Yang Dipertuan Bagi Negeri Dan Jajahan Takluk Johor Darul Ta'zim.

I am confident that all Members of the House are aware that humbly acknowledging the royal command of the Sultan of Johor is part of the Undang-Undang Tubuh Kerajaan Negeri under Part Two Article 14, namely "Badan perundangan bagi negeri hendaklah mengandungi Raja dan sebuah Dewan yang dinamakan Dewan Negeri." Like a ship with its captain, setting the direction towards its destination, ruler and people are inseparable; his love is held high, his command is obeyed.

Honourable Mr Speaker, I also humbly acknowledge the advice given by His Majesty Tuanku that Members of the House make the best use of this Meeting to debate and put forward constructive proposals in the context of managing the COVID-19 pandemic and restoring the state's economic affairs. Therefore, throughout my observation while the Meeting was in progress, I am of the view that all the contents of the royal command of Duli Yang Maha Mulia Baginda Tuanku have been taken into full consideration by these distinguished Members of the House. Among other things, Baginda Tuanku advised that critical times such as these must be used fully for us to unite, avoiding mere disputes, in order to bring well-being to the lives of the people of the state of Johor whom we love.

Praise be to Allah SWT that Johor has made history, because our Meeting this time is the earliest State Assembly Meeting held after the state of emergency was lifted on 1 August 2021. We went by the original proposal; if following the original proposal, this Meeting was supposed to be held for seven days. However, after a risk analysis carried out by the Johor State Health Department (Jabatan Kesihatan Negeri Johor), the Meeting was shortened to four days, excluding the day of the Opening. Meanwhile, the House Meeting was permitted for only half a day. Also on the advice of the Health Department, this four-day Meeting had to be postponed twice. The first time it was postponed for 10 days to update the public health SOPs in this honourable House. The second time it was postponed due to several active cases detected in this building. We must all accept the reality that our challenge is to carry out our responsibility of meeting the demands of democracy within the new norm. I also wish to thank Honourable Mr Speaker for the firmness and competence shown in managing the proceedings of the House. More importantly, this Meeting was successfully conducted despite several changes to the Meeting schedule.

Honourable Mr Speaker, I would like to thank all Honourable Members for the constructive and meaningful debates. Certainly, I and the state government will refine all the suggestions given for implementation at the earliest opportunity, as appropriate. I will also ensure that matters in the constituencies of Honourable Members are given due attention. I have observed every debate by Honourable Members, which essentially touched on three matters. Overall, although only 10 minutes, these were addressing the COVID-19 pandemic, management of economic affairs, and improving government engagement, as well as constituency matters of Honourable Members.

I also express my thanks to the Honourable Chairmen of the Committees who gave comprehensive explanations on the matters raised, and even elaborated more than what was asked. Our Meeting this time, although Honourable Members can only debate within the time given of 10 minutes, the Chairmen of the Committees were given 20 minutes and only four persons,

it is appropriate, four persons: one who touched on the issue of COVID, one who touched on the state's economy, and the other two EXCO members, one city EXCO and one rural EXCO. This does not mean that the other EXCO members are not important, or that other matters are not important, such as education or religion, or consumer affairs, women's affairs, tourism and youth. They are also important, and the matters raised will be provided or answered in writing, as promised by the Chairman of the Committee.

Honourable Mr Speaker, almost all Honourable Members, as I said earlier, raised the matter of addressing the COVID-19 pandemic, including the Honourable Member for Bukit Pasir, the Honourable Member for Jementah, Buluh Kasap, Penawar, the Honourable Member for Semerah, the Honourable Member for Bekok, the Honourable Member for Perling, and the Honourable Member for Bukit Batu. We all know that since the COVID-19 pandemic began to hit Johor, the state government found that the state's public health system and capacity were unable and difficult to cope with the waves of COVID-19. This applies whether in terms of ICU bed capacity, use of human resources, or application of data or the latest technology in efforts to tackle COVID-19. However, we are not just sitting idle; the state government is committed to implementing every decision and determination made by the federal government. This is because, in line with the spirit of the Federal Constitution, public health is placed on the concurrent list as a shared responsibility of the federal government and state governments. Therefore the state government will always assist the Health Department and the relevant agencies in increasing capacity and renewing the quality of public health, as follows.

Firstly, the Johor State Health Department has implemented virtual CAC to reduce physical attendance at all 11 CACs throughout the state of Johor. This initiative has directly given impact in easing the burden of frontline workers at the CAC and facilitating close contact management efforts.

Secondly, the Johor State Health Department will always cooperate with the District Disaster Committee chaired by the District Officers so that every effort to tackle the pandemic can be coordinated down to the grassroots level. This includes activating the roles of community leaders, as mentioned by the Honourable Chairman of Health, Health Committee, through the COVID-19 Advocacy Leaders Initiative (IPAC) for cultivating the new norm among the people of Johor. That is the second.

Thirdly, the cultivation of the new norm in industrial areas and workplaces will continue to be multiplied through the Johor Industrial Preparedness Plan programme (JIPP). JIPP will emphasise the industry's responsibility to take stricter preventive and control measures to tackle COVID-19 at the workplace. This means that the government understands that, in a situation where Johor has become an industrial state, every investment that comes in and every industrial activity in Johor, starting now, we must think about the matter of workers' dormitories. In the early stage of the spread of COVID-19, this was not caused by difficulty in complying with SOPs in factories or enterprises, but rather occurred in the accommodation places or dormitories of the workers concerned, until it spread to the community. The government is studying this matter, whether in terms of development policy or by referring to the State Planning Committee, so that issues related to investment in providing accommodation or workers' dormitories become one of the important features that must be emphasised in every approval given, or in every development consent given by the authorities.

Fourthly, Honourable Mr Speaker, is to launch the National COVID Immunisation Programme (CITF) of the state of Johor together with JKNJ, or the Health Department, which continues to strive to increase the state's vaccine administration capacity in a manner that is continuously enhanced, with its methods renewed from time to time. There is no need for me to state this in detail, as it has already been explained by the Honourable Chairman of Health. However, up to now Johor has the capacity to administer 70,000 vaccine doses a day. This capacity will continue to be increased, depending on the vaccine supply needs at the vaccination centres, totalling 241.

And fifthly, Honourable Mr Speaker, is to further expand the reach and rate of state vaccination, including the walk-in vaccination initiative mentioned just now. Meanwhile, the sixth matter, under efforts to tackle COVID-19 and touching on vaccine supply: a few months ago, Johor experienced a low vaccination rate. I wish to explain that this is a global phenomenon in which demand for vaccines exceeds available supply. It was further aggravated by the actions of some developed countries that stockpiled vaccines for their own use, and even Singapore at one point was worried that inconsistent vaccine supply would disrupt the momentum of its vaccination programme.

In Johor, for the information of Honourable Members, at the Special Sitting meeting we unanimously agreed to give more vaccine supply to the state of Selangor and also the state of Sarawak. Selangor because of the rising positive cases in that state, while Sarawak was said to need to hold its elections early. So on that basis, the other states agreed that Selangor and Sarawak be given more, prioritised in the vaccine supply. Nevertheless, I am confident that the situation in the coming months will become increasingly better as supply arrives consistently, whether at federal or state level. In the context of Johor, the Health Department has received a total of more than two million vaccine doses in August and September. We will receive two million vaccines, as recorded in the register of the Ministry of Health Malaysia, as a commitment of supply for this September.

Apart from that, Honourable Mr Speaker, the seventh matter is that the state government has spent more than RM14 million to carry out three initiatives to ease the burden of the Health Department and related agencies through the Ihsan Johor Economic Stimulus Package 3.0. The first of these initiatives is the purchase of COVID-19 test kits for targeted testing by the Health Department. The second is the purchase of COVID-19 test kits by three Local Authorities for use by residents in the city of Johor Bahru or the Johor Bahru district. And the third, operating expenses for PPV, road blocks, and welfare for frontliners, all were given attention and assistance in financial form, in the form of facilities, to ensure that the burden borne by the Health Department and related agencies is eased to some extent.

In our efforts to help and cultivate self-testing among the people, it should be in line with the state's health capacity and must be based on public health strategy. The state government has no objection to self-test kits being provided free of charge. However, it must be based on the advice and data of the State Health Department in the method of implementation.

Honourable Mr Speaker, in our efforts to combat and tackle COVID-19, the close relations and strong ties between Johor and the Singapore government, through Temasek Foundation or SMRT Corporation, have contributed various medical equipment to Johor. So far, more than 9 million units of medical equipment such as ventilators, face masks and others have been donated. All these donations have been handed over to the relevant agencies and departments. This includes that in the near future the state government will receive 300 doses of Sinovac vaccine, the result of a donation from the government of the United Arab Emirates, and also 1,640 doses of Pfizer vaccine from the Singapore government. On this occasion I wish to convey a thousand thanks for these donations. It is a manifestation of the relationship that has been established for decades.

Honourable Mr Speaker, in June last, as one additional initiative to the efforts made, under the Ibrahim Johor Economic Counsel, expert public health advice was obtained through the Johor State COVID-19 Advisory Committee that was established. For the information of Honourable Members, this Committee comprises Profesor Dato' Dr. Adibah Kamarulzaman, former Dean of Medicine of Universiti Malaya, who is also Prof. Adjong Yiel of Universiti Amerika Syarikat. Dr. Desi Raja, a public health consultant. Dr. Yap Wei On, a public health consultant. Encik Ahmad Shahizam, Managing Director of KPJ Health Care Berhad. Dr. Zubin Darwala from Price Waterhouse Coopers (PWC) Singapore and Asc. Prof. Dr. Mat Ismail Ali from Kumpulan Perubatan Johor. This Committee has put forward views and advice for the state of Johor on managing its COVID-19 pandemic and increasing public health capacity in the state of Johor.

Honourable Mr Speaker, allow me to move on to the matter of management and economic affairs. This will also answer some matters raised by the Honourable Member for Penawar, Mengkibol, Panti, Paloh, Parit Yaani, Stulang, Johor Jaya, Bekok and Permas. As we are well aware, the closure of various economic sectors has caused a large portion of the people to lose their source of income and fall into poverty. The Gini Coefficient for the state of Johor has also recorded an increase, and the number of households moving into the absolute poor, relative poor and hardcore poor categories has also increased. Recognising this situation, Johor introduced three Ihsan Johor Economic Stimulus Packages containing various initiatives. This was the first time it was implemented in the state on a comprehensive scale. For that purpose, the state government has spent RM491 million through 103 initiatives that benefited 1.1 million recipients. The state government also acknowledges that the state's social protection initiatives must always be renewed so that no overlap occurs and more eligible recipients can receive the assistance they need. This effort is carried out through data refinement activities between the Economic Planning Division and the relevant state and federal agencies. The state government is also very sensitive to the industries and multinational companies operating in Johor. As stated by the EXCO for Investment, several rounds of dialogue have been held with business chambers from Taiwan, Europe and the United States to hear their problems regarding health SOPs at the workplace. As a result, the Johor state government has given assurance that their enterprises will be able to continue operating provided they follow the guidelines set by the State Security Council and the National Security Council for the state of Johor.

Assurance was also given that every investment of theirs in Johor will be taken care of and facilitated by the state government according to demands and needs that can be met by the state government. Thus, in line with economic recovery efforts, the state government has taken steps to bring together the country's economic experts through the Johor Economic Advisory Committee, which is also one of the initiatives under the Ibrahim Johor Economic Counsel. I myself chaired the meeting of this Committee, which was also attended by the relevant EXCO and state government officials. The members of this Committee comprise Yang Berbahagia Tan Sri Sulaiman Mahbob, Chairman of Majlis Institute Of Economic Research (MIER); Dr. Muhammed Khalid, founder of DM Analytics; Datuk Majid Khan, former chairman of Malaysia Investment Development Authority (MIDA); Mohd. Azmi Zulkifli, CEO of Invest Kuala Lumpur; Dr. Nungsari Ahmad Radhi, former chairman of Khazanah Research Institute; and Dr. Affendi Yusof from Universiti Teknologi Malaysia. This advisory committee has discussed efforts to restore the state's economy, especially in realising the food security agenda and the Johor Digital agenda. This includes further strengthening economic ties between Johor and Singapore. In principle, a holistic state economic recovery must begin with a more comprehensive and progressive economic relationship between Johor and Singapore.

Honourable Mr Speaker, the state government is aware that opening the Johor – Singapore border is a basic component in efforts to recover the state's economy. It will certainly revive the retail sector and the tourism sector, in addition to reviving economic activity in Johor Bahru city and neighbouring districts. The reopening of the Johor – Singapore border will also restore the vigour of the property sector, which will certainly be more lively, especially when the federal government reviews the policy on the Malaysia My Second Home (MM2H) programme. It is hoped that the new policy being reviewed will have a positive impact on the state of Johor.

Accordingly, I very much hope that the state government will be directly involved in the initiative to open the border for land crossings involving the Johor Causeway (Tambak Johor) and the Second Link. State government representatives need to be included in the joint committee or secretariat to carry out initiatives important to the state of Johor. This secretariat is hoped, among other things, to hold more comprehensive discussions on the reopening of the Johor – Singapore border based on the latest developments of the COVID-19 pandemic. God willing, cross-border movement between Johor and Singapore may be reactivated with more appropriate SOPs. In a controlled pandemic situation, we can implement the Reciprocal Green Land (RGL) and we can implement the Periodic Commuting Arrangement (PCA). So it is possible that, with the presence of a secretariat and direct Johor involvement, the Daily Commuting Arrangement (DCA) or Travel Bubble can be discussed through that secretariat.

Honourable Mr Speaker, another matter that has been much raised by Honourable Members is improving government engagement. I think the explanation given will, to some extent, answer matters raised by the Honourable Member for Parit Raja, Parit Yaani, Stulang, Jementah, Semerah, Panti, Serom, Bekok, Tangkak, Kota Iskandar, Tiram and Permas.

Honourable Mr Speaker, this pandemic has gradually shown us the cracks in governance and in the political system in general. In other words, the pandemic do not break the system but instead has expose a broken system, dengan izin. This phenomenon is further aggravated by the public perception that leaders are too political. Hence, politicians are considered insensitive to the hardships faced by the people. Democratic institutions are considered no longer effective in efforts to resolve the people's problems. The culture of consensus and cooperation is also considered a waste of time, outdated and ineffective.

I am aware, I observe, that many Honourable Members have touched on Rakan Strategik. Recently social media has also depicted how the people's sentiment towards political leadership is. They think too much about the conduct of leaders and the policies of politicians. It is feared that if this phenomenon continues, it will hamper the state's economic recovery plans. Pandemic management can become chaotic. Good policies will be seen as weak and ineffective, as a result of the lack of trust in policymakers, namely the Wakil Rakyat themselves. Therefore, every Wakil Rakyat must always feel the pulse of the people. We must be mindful of the lives of the people today. I wish to repeat the royal command of Duli Yang Maha Mulia Baginda Tuanku: the people outside are starving. They have become poor due to losing jobs and losing income. This is a very critical time for us to tackle the spread of COVID-19 together.

Indeed, it is a very frightening pandemic that endangers lives.

Therefore, in my view it is appropriate for the state government to improve government engagement. This engagement involves all Honourable Members, whether government or opposition, and must be sustainable. It has to be sustainable engagement, dengan izin Honourable Mr Speaker. It must not be one-off or for the moment only. Sustainable engagement also needs to be improved so that it leaves a positive impact on the democratic system that we uphold. Who knows, today we are here, tomorrow perhaps we are there. Today we give however much allocation; hopefully, when those over there are here, they will not reduce the allocation. That is why it must be sustainable engagement. It has to be a sustainable engagement among all parties, not one-off, not a decision of a niggle nature. So, based on such principles, the government will translate this sustainable engagement through several initiatives, as follows: As has already been announced, the state government has given special allocations periodically to Honourable Members. For the year 2020, the state government allocated RM130,000.00 for each ADUN in stages. For 2021, including the RM150,000.00 that I announced, making a total of RM350,000.00 given to all ADUNs.

Honourable Mr Speaker, I resume the matter relating to the special allocations mentioned earlier. It is the government's intention to consider a method within this concept of sustainable engagement, so that these special allocations are not merely something announced by a Menteri Besar alone, but are enshrined in a law or regulation stipulating that People's Representatives elected by the people are not only given emolument or allowances, but that an allocation is also clearly provided in an official document, to allocate a certain amount for these People's Representatives to finance pro-people initiatives in their respective areas. Please give the government some time to study how and in what manner this can be done, to enable it to become something enshrined in the provisions of this State Legislative Assembly.

Secondly, Honourable Mr Speaker, the state government is ready to gradually implement reform of the Johor State Assembly according to suitability and needs, as discussed at one point during this Meeting, during this term of the Session, to establish more Special Select Committees at State Assembly level in the future. In fact, I commit to making this initiative a sustained effort. However, the involvement of opposition Honourable Members at committee level, or to be at state or district committee level, is not necessary because it relates to the implementation of government policies, whereas the involvement of Honourable Members should be at the level of the State Assembly Committees, in line with the effort to democratise the State Legislative Assembly.

If I may explain, this is in line with the position of Honourable Members in this House as policy makers and lawmakers, and we must continue to maintain the democratisation of checks and balances. This democratic system of checks and balances is good for a government. So if Honourable Members sit on committees at the implementation level, whereas Honourable Members should be reprimanding the government for what has not been implemented perfectly, what has not been done, what has not been carried out based on the policies we have agreed upon. Therefore, in the state government's effort to involve Honourable Members, it will organise briefing sessions with People's Representatives when the House is not sitting. As an example, during the emergency we held two discussion sessions, either on pandemic management or on state economic management. Therefore, the practice of sharing information and giving a current picture of the situation of the state government's administration outside the Meeting calendar will become the practice of the government today.

The state government will continue to be committed to always listening to the views of opposition Honourable Members through briefing sessions and discussions held in the future. The nearest is the state government's work to draft the Johor Budget 2022. However, the involvement of opposition Honourable Members we will implement at State Assembly Committee level, and it will be ensured that it can be done within the near future and will touch on matters related to the implementation of government policies. So, with that, I will form a Special Committee comprising the Ketua Pembangkang, opposition Honourable Members, and federal or state government officials concerned, so that this Special Committee will scrutinise the socio-economic policy proposals for the post-COVID-19 state of Johor, Insya-Allah.

Honourable Mr Speaker, I would like to borrow the words of Rousseau, a Western philosopher, in his book The Social Contract. "The principle of political life dwells in the authority. The legislative power is the heart of the State." Ha, this is the heart of the state of Johor. "While the Executive power is the brain, which sets all the parts into motion, if the brain is paralyzed, the individual will still be alive. However, as soon as the heart stops functioning the individual is dead." So let us not stop from purifying this House, from reviving this House with meaningful debates, because that is the importance of the legislative power as the highest democratic institution of the state. It must always be kept alive and nurtured for the good of all parties, especially in difficult times like now. Therefore, indirectly I have explained the question raised by the Honourable Member who proposed that this House be held in hybrid mode. I understand that question to mean that if the House cannot sit due to SOP constraints, it could be done in hybrid mode. But for us, Honourable Mr Speaker, there is no need. Our House is spacious, our House is big, and its space is not worrying. So I am very confident and believe that, as long as the allocations or laws allow this House to sit, it will sit according to the calendar determined by the Undang-Undang Tubuh Kerajaan Negeri.

Honourable Members, who are all respected, on that basis I would like to announce several initiatives to assist the people of Johor who are in difficulty. Among them, we will continue to step up efforts to help unregistered small traders. Previously we helped registered ones, but we will also expand this assistance to traders who are not registered with the Companies Commission of Malaysia (SSM) or with the Local Authority. We will obtain cooperation from the District Office through the Penghulu and Ketua Kampung so that such unregistered small entrepreneurs and traders can be identified.

Next, providing assistance to imams and bilal who do not receive allowances from the Johor State Islamic Religious Department, because there are mosques and suraus that appoint imams and bilal, noja who are paid salaries through the mosque fund concerned or the surau fund concerned. Therefore they are not among those who received assistance recently, so we will expand that assistance to imams and bilals who do not receive allowances from the Islamic Religious Department. We will also expand education tuition at primary and secondary school level under the management of the Johor Education Foundation. This is because we know that for nearly two years our children have not been able to go to school due to the SOPs that have been set, so one effort the government wants to make is that the Education Tuition Programme run by the Johor Education Foundation will be reactivated and further expanded.

We will also expand, or the state government will also expand, religious education and Al-Quran education online by the Islamic Education Division, Johor Islamic Religious Department. Then we will provide support services to groups traumatised by the loss of family members due to the COVID-19 pandemic. Also, the government will mobilise cooperation between the State Education Department and District Education Officers to embrace children who have become orphans due to the death of their mother or father. The state government will also hold various initiatives to assist frontline groups who are willing to sacrifice in carrying out their duties during this pandemic era. And, lastly, is to increase the allocation under the disaster management programme for the state of Johor. If asked whether the government will expand assistance, the answer is yes. The government will expand assistance.

Honourable Mr Speaker, at the end I also wish to offer congratulations to our football team. JDT, on the 12th day of this month, will win the trophy for the Super League Championship for eight consecutive times. Indeed, the JDT team has set a high standard and professional status in football. May it elevate the dignity of the nation's football sport to a higher level. Apart from JDT's success, we also give appreciation for the glorious achievement of athlete Chew Wei Lun, who won the silver medal in the Boccia event at the Tokyo 2020 Paralympic Games. So the state government will consider giving an appropriate reward to this Johorean. I will discuss with the Honourable EXCO for Youth and Sports what form and manner of appreciation can be given to Saudara Chew Wei Lun.

I take this opportunity at the end to express my highest thanks to all frontline members, comprising staff of the Ministry of Health, Royal Malaysia Police, Civil Defence Force, People's Volunteer Force, Local Authorities and others whom I cannot mention one by one, who are willing to work without feeling tired or exhausted. Words of thanks also to the Yayasan Sultan Ibrahim for the various donations and assistance given to the people, especially those involved in the COVID-19 pandemic. I also give words of thanks to the federal government, the Singapore government, corporate and private bodies, GLC companies, non-governmental organisations and others whom I cannot mention, because they also contributed to the state government in a difficult situation like now.

Honourable Mr Speaker, indeed, we are all treading a timeline towards a destination that we still do not know. However, in this current uncertainty, we as People's Representatives must rise above the uncertainty. We should give our best to the people and ensure that every action we take does not harm the future heirs of the state. Hopefully, someday history will judge us as a generation that was brave in opening the doors of change and carried out that change with orderliness and care. May Allah SWT deliver us from the COVID-19 pandemic as quickly as possible and give strength to all the people of Johor to keep resilient and continue to progress. Let us together hold firmly to the Johor taglines, namely "KEPADA ALLAH BERSERAH" and "MUAFAKAT ITU BERKAT". Thank you. Wabillahi taufik walhidayah, Assalamualaikum warahmatullahi wabarakatuh. Thank you.

SpeakerEN

Thank you, Most Honourable Member. The motion before this House is that the following address of thanks be presented to His Royal Highness the Sultan of Johor:

"Ampun Tuanku, we, Mr Speaker and the Members of the State Legislative Assembly sitting today, have resolved to make our humble obeisance and offer our most profound thanks for the gracious consent of His Royal Highness the Sultan of Johor to come to this honourable House and to command the opening of the Fourth Meeting of the Fourteenth Session of the Johor State Legislative Assembly."

The motion was put forward for a decision. Those Members who agree, please raise your hands; those who do not agree. The motion was agreed to.

It was announced that the Honourable Member for Skudai has withdrawn the motion concerning the increase in the number of vaccine doses in the State of Johor under Standing Order No. 33(2) of the Standing Rules and Orders for the Johor State Legislative Assembly, by his letter dated 6 September 2021. The Honourable Member for Skudai withdrew the motion because the current vaccine doses had exceeded what was contained in the motion. The Clerk of the State Legislative Assembly has informed all Honourable Members, by letter dated 7 September 2021, of this matter.

The motion is deemed to have been withdrawn, and a note regarding it shall be entered into the Minutes of the Meeting.

Datuk Haji Samsolbari bin JamaliUMNO · BNChairman of the Committee on Agriculture, Agro-based Industry and Rural Development · SemarangEN

Mr Speaker, I move that this House be adjourned.

Tuan Haji Mazlan bin BujangBERSATU · PHChairman of the Committee on Education, Information, Heritage and Culture · Puteri WangsaEN

Mr Speaker, I second the motion.

SpeakerEN

Honourable Members, we must all give thanks to God for permitting this Sitting to proceed safely. Alhamdulillah, all Members of the House are free from COVID-19. May we be able to hold sittings safely in the future. Before this House is adjourned, I and all Members of the Johor State Legislative Assembly wish to record our highest appreciation and gratitude to the frontliners, who are always on standby in carrying out their duties without regard to fatigue, protecting the safety and well-being of the people of this state and this country since the outbreak of COVID-19. Honourable Members, I now adjourn this House until a date to be determined. That is all. The Sitting was adjourned at 1.26 p.m.

Duty Officers:

SpeakerEN

Clerk Puan Hajah Nor Azleena binti Abdul Rahman Cik Hajah Shubanah binti Yusuf Tuan Haji Zainal bin Eran

Assistant Clerk Encik Hasnul Atmam bin Othman Puan Farrah Diana binti Mohammad

Coordinator Cik Norzita binti Abdul Aziz

Publication Assistants Puan Malina binti Mohd Nasir Puan Noraisah binti Mohd Yusof Encik Ariff bin Abu Bakar

Operations Assistants (Bentara) Encik Razine bin Sulaiman Encik Hamdan bin Markom Encik Norhayadi bin Hussien Encik Muhamad Khirunizam bin Pahmi Encik Mohd. Norazri bin Kassim Encik Sapri bin Manan Encik Muhamad Khairul Asyraf bin Abdullah Encik Muhammad Khairul bin Arop Encik Mohd Khalid bin Nordin

Office Secretaries (House Reporters) Puan Hajah Azlin binti Bahrin Puan Junaidah binti Paing Puan Shuriati binti Abdul Hajar Puan Hajah Fareza binti Musa Puan Rumiah binti Semirono Puan Norazilawati binti Masri Puan Hajah Haironisha binti Zainal Abidin Puan Hairun Nurul Ain binti Zainal Abidin Puan Norhafizah binti Osman Puan Norlydialina binti Ithnin Puan Nordalilah binti Dahalan Puan Zahiti binti Mohd. Hamdi Puan Siti Rojimah binti Abd. Razak Puan Siti Rohani binti Ahmad Suhaimi

Recording Encik Nor Risam bin Esa Encik Azizan bin Md Sidi Encik Khairul Anuar bin Umar Usman

Video Audio Operators Encik Noorazhan bin Mohd Salleh Encik Ismail bin Abu Bakar