Pulau Pinang · 9 August 2018

14th Assembly, 1st session, 1st meeting · 447 turns · 64,658 words · official PDF ↗

394 of 447 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalPenang publishes one PDF per sitting day with an attendance list, so each sitting shows who was absent. Speakers are matched by our parser and will have some errors.

Absent: Dato' Ir. Haji Ahmad Zakiyuddin Bin Abd. Rahman (Pinang Tunggal), Lim Guan Eng (Air Putih), Saifuddin Nasution Bin Ismail (Pantai Jerejak)

(Opening)

Secretary of the HouseEN

Honourable Members, Mr Speaker of the State Legislative Assembly (DUN). Recitation of prayers.

Deputy Secretary of the Dewan

Bacaan Doa.

Secretary of the House

Soalan lisan.

Speaker (Speaker)EN

Honourable Members, we resume sitting with oral questions. I now invite question number 32.

Ong Ah TeongDAP · PHBatu LancangEN

Mr Speaker, my question is number 32. No. 32. What are the State Government's plans to build a racing circuit as contained in the Pakatan Harapan Manifesto?

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Mr Speaker of the State Legislative Assembly. Question 32 was addressed to the Honourable Member for Batu Lancang. The State Government is committed to fulfilling the promises contained in the Pakatan Harapan Manifesto, including the construction of a racing circuit, on the basis of government accountability to the people. The construction of a racing circuit requires careful and orderly planning. For this purpose, the State Government will obtain views and proposals from experts in this field, and from technical agencies involved in the national motoring industry. The recommendations and specifications for this proposed construction need to be studied in depth, including determining suitable construction locations.

For the information of the Honourable Member for Batu Lancang, so far the car park of Stadium Batu Kawan has been used as a racing circuit for motorsport under the Petronas AAM Malaysia Cub Prix programme, organised by Safe Aim Mutual Sdn. Bhd., where it has been used since 2009. The last competition held at Stadium Batu Kawan was on 16 and 17 April 2016. The competition scheduled for 2017, on 4 and 5 November 2017, was cancelled at the last minute because of stormy weather that did not permit the race to proceed on safety grounds. For 2018, the race was scheduled to be held on 27 and 28 October 2018.

Speaker (Speaker)EN

Thank you, Bagan Jermal.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Speaker, two supplementary questions for me. So, my first question is whether it is a necessity to build or provide a racing circuit at a cost of millions of ringgit. My second question is what the main objective in the State Government's manifesto is for providing this racing circuit. Will the provision of this racing circuit curb or overcome the problem of rempit racing? If so, I would like to ask the Honourable Member for Bagan Jermal, which state or country has built a racing circuit to solve the problem of rempit racing in our country? That is all, thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Batu Lancang, for the supplementary questions. I am indeed of the view that the need to build or provide a racing circuit arises if the State Government receives sufficiently large demand, and after a thorough study is carried out. The Penang State Government will not arbitrarily carry out a major project without conducting a detailed study, because, this project will indeed involve very high costs in sports fields where we have to spend on construction costs. And the State Government will not carry out a project that does not bring welfare to the people of Malaysia.

Therefore, so far the State Government is still carrying out the study to assess the need for the construction of this racing circuit. In addition, as I have always said, long-term maintenance costs are one of the major challenges compared with construction costs. For example, suppose the construction cost of a futsal court is RM350,000. But after this, are the expenditures to be included in the budget? This includes the budget of MPSP, MBPP (Penang Island City Council), the budget of the District Office, the budget of the State Sports Council (MSN), the budget of the State Government if the sports complex is owned by certain parties. This is because construction costs are only a short-term challenge, so maintenance costs are then a major cost.

Therefore, the State Government is still at the stage of carrying out a study to assess the need for the construction of a racing circuit in the State of Penang. Second question. Answer together.

Speaker (Speaker)

Jawab.

Soon Lip CheeDAP · PHBagan JermalEN

The second question just now, that is, the purpose of the Manifesto. The main objective in the State Government's Manifesto for providing a racing circuit is to create a suitable place for the people of the state to carry out racing circuit activities, such as racing competitions, go-karting, Moto GP activities, the Auto Moto Carnival and so on. We have many methods to overcome the problem of racing enthusiasts. We do not use rempit riders, and building a racing circuit is not the main method. So far, to my knowledge, there is no state or country that has built a racing circuit only to solve the problems of racing enthusiasts. This is because the construction of a racing circuit is for the use of healthy racing activities and is not for street racing. For example, the F1 circuit in Sepang, Selangor was built to organise and host the world-class Formula 1 competition.

There is one example, the racing circuit owned by Universiti Malaysia Perlis, under a school club named UNI Art, University Automotive Racing Team… (with permission) Dato' Speaker. This club is under the school of mechanics, there is mechanical engineering, and it is for teaching technical students, skills and also for automotive students, and this is in the State of Perlis. Only it is open to students at the university only. Perhaps we will make a visit to the State of Perlis, Universiti Malaysia Perlis, to obtain more detailed information on whether the racing circuit built is used by students and also what the construction costs were, and also the suitability of that location and area.

These are the pieces of information that we will gather, so that we will obtain more information, and only after a careful study will we implement this project.

Speaker (Speaker)EN

Thank you, Bagan Jermal. Please proceed, Batu Uban.

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Thank you Dato' Speaker. My question is number 33. No. 33. My Service Centre receives many visits from dialysis patients. (a) Will the State Government open a dialysis centre in the State Assembly constituency (DUN) of Batu Uban?

Phee Boon PohDAP · PHSungai PuyuEN

Thank you Dato' Speaker, I would like to answer question number 33. So far, the State Government has no proposals to set up a hemodialysis centre in the Batu Uban State Assembly constituency. Up to 2018, the State Government had three (3) centres, namely the CAT Dialysis Centre in Balik Pulau, the CAT MAA Medical Care Dialysis Centre in Seberang Jaya, and the CAT Majlis Masjid At-Taqwa Dialysis Centre.

In addition, there are also two Federal Government Dialysis Centres, namely at Penang Hospital and Balik Pulau Hospital. Any proposal regarding the establishment of a dialysis centre in the area must be studied and examined from various factors, including the financial implications for the State Government, site suitability and others, including obtaining approval from the Ministry.

Speaker (Speaker)EN

Thank you, Sungai Puyu. Next, please, Jawi constituency.

H’ng Mooi LyeDAP · PHJawiEN

My question is number 34. No. 34. What are the plans of the Development Committee (JKP) regarding a plot of land beside the Nibong Tebal Federal Road next to the Shell petrol station? (a) Will the JKP make the area a bus station hub?

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you Dato' Speaker. Thank you to my colleague from Jawi for the question on what the plans of the Development Committee (JKP) are regarding a plot of land beside the Nibong Tebal Federal Road, next to the Shell petrol station, and whether this will become a bus station hub.

To answer this, Dato' Speaker, the previous JKP's plan was to develop the area into a business centre integrated with the public transport system. However, this plan needs to be reviewed and re-examined now that the Pakatan Harapan Government has formed the Federal Government, after the 14th General Election (PRU-14).

As for the question of whether it will become a bus station, a bus station hub, indeed the original proposal for this area is to be developed as a public transport hub, namely for buses and taxis, Dato' Speaker.

Speaker (Speaker)

Terima kasih.

H’ng Mooi LyeDAP · PHJawi

Soalan tambahan.

Speaker (Speaker)

Sila.

H’ng Mooi LyeDAP · PHJawiEN

Thank you. Honourable Member for Datok Keramat, my question is to overcome the problem that exists now, namely that the area has no bus stop. Even if there is one, it is rather unreasonable, because we have the CAT Free Bus. For the time being in this area, I understand that the plot of land used for the bus stop belongs to the JKP. Therefore, my question is, can the State Government request that the JKP, if there is no plan for the next five (5) years, then we ask the State Government to build a temporary bus stop so that bus users, when it rains, can have a more comfortable place and do not have to get wet. And my second question, regarding that area as well. Since the Nibong Tebal area has only one entrance from the direction of Parit Buntar, I ask whether the State Government can reconsider making that area a route for entry and exit. I mean, add an entry and exit route to Nibong Tebal town.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Regarding the second question asked just now, I will start with that, concerning whether a study can be made of an entry route to Nibong Tebal town. We can indeed carry out that study. Now, regarding the first question, a good question, namely that the land mentioned, the plot of land, belongs to the JKP. Indeed, they are the ones who should develop the land. But the side question asked, whether the government can consider providing more bus stops to protect those who wish to use bus services, is indeed a very good proposal. As is known to Jawi, after we introduced and expanded the Free Bus Services (CAT), where we introduced new loops a few months before the General Election, not only on the island side but also on the mainland side, there are several loops with free bus services. If we look at it after the introduction of these services, Dato' Speaker, many new areas have indeed been made into routes or loops, and both local authorities, MBPP and MPSP, have been asked to carry out studies on whether more bus stops can be provided and whether existing bus stops can be enlarged because more people are using those bus stops. So I agree with what Jawi has said regarding this matter, and if necessary we can review the area in Jawi again.

Speaker (Speaker)

Terima kasih.

H’ng Mooi LyeDAP · PHJawiEN

Just a little addition, that area is indeed necessary because for the time being it is a…(disturbance).

Speaker (Speaker)EN

Jawi, this is not the time for debate, it is a question.

H’ng Mooi LyeDAP · PHJawi

Terima kasih.

Speaker (Speaker)EN

Next, Bukit Tambun.

Goh Choon AikPKR · PHBukit TambunEN

Thank you Dato' Speaker, my question is number 35. No. 35. What are the integrated plans and actions that have been and will be taken by the State Government regarding traffic congestion on Federal roads, such as: (a) The Auto-City and Jalan Kebun Nenas interchange. (b) The Bukit Tambun toll plaza, Jalan Batu Kawan and Jalan Bukit Tambun. (c) The traffic light junction of the Federal Road and Jalan Bukit Minyak.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you Dato' Speaker, thank you to the Honourable Member for Bukit Tambun for his question regarding the State Government's plans for traffic congestion on Federal roads. Honourable Member, among the integrated plans and actions that have been and will be taken by the State Government regarding traffic congestion on Federal roads raised by the Honourable Member are as follows. For the Auto City and Jalan Kebun Nenas interchange, the project to upgrade Jalan Auto City and Jalan Kebun Nenas to a Federal Road has been included in the list of project applications under the Eleventh Malaysia Plan (RMK-11), but has not yet been approved, and the Public Works Department (JKR) will continue to submit an application for this project in the Rolling Plan Malaysia, the upcoming Eleventh Malaysia Plan. For the Bukit Tambun toll plaza, Jalan Batu Kawan and Jalan Bukit Tambun, so far the Public Works Department is still in the process of upgrading the junctions around the Federal Road, namely Jalan Bukit Tambun FT149, in stages. For any routes connected to state roads, for example Jalan Pa'Boi, JKR has applied to carry out study work for the areas that have been identified. As for the long-term plan, JKR will submit an application to the Federal Government through the Ministry of Public Works (KKR) to upgrade the road widening project and changes to traffic flow, considering that this road is a Federal Road and the project will involve very high costs. Third, the traffic light junction of the Federal Road and Jalan Bukit Minyak. Here, to overcome the traffic congestion, JKR intends to upgrade the two (2) lane single carriageway, or two (2) lane single carriageway, to a four (4) lane dual carriageway, or four (4) lane dual carriageway, from Permatang Tinggi FT 001 Section 740.4 to Sungai Juru Section 746.4 Bukit Tengah, and has already submitted this application under the fourth Rolling Plan for RMK-11, but it has not yet been approved. The JKR will continue to submit this application in the fifth Rolling Plan of the upcoming Eleventh Malaysia Plan. Thank you Honourable Member.

Goh Choon AikPKR · PHBukit Tambun

Soalan tambahan.

Speaker (Speaker)

Sila.

Goh Choon AikPKR · PHBukit TambunEN

The southbound Bukit Tambun toll plaza junction involves the maintenance authority of the Federal JKR, the State JKR, PLUS and MPSP. What action will the Honourable Member for Tanjung Bunga take to address the overlap in terms of allocation, and the overlap in terms of maintenance authority?

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member for Bukit Tambun, who always shows concern for traffic issues. As you know, Honourable Member, you are also a Town Planner, and I always appreciate the input given by the Honourable Member. For the junction that the Honourable Member referred to, indeed it is a point where several different areas of authority meet, namely PLUS, the State JKR, the Federal JKR and also MPSP. However, in theory, an overlap of authority does not in fact occur. This is because the boundary lines of the maintenance areas are very clear. If we look, it is written on the yellow line painted on the road or on the signboards. For example, for the PLUS highway, the maintenance limit does not actually reach that junction; it is about 50 metres from the junction. For State roads, we actually have a toll road in front of the toll going south towards Batu Kawan, which is under the State JKR, and for the Federal side, we have FT149 and FT150. Both of these are Federal roads, but although there are Federal roads and State roads, at the end of the day, the agency responsible for maintaining both of these roads, or all of these roads, is the JKR. This means the agency is still the same, so from the maintenance issue I think it is not a problem for MPSP, which is only responsible for the traffic lights. Even so, I understand there may be some confusion over traffic management at that junction. I have been informed that there have been road closures to carry out traffic diversions and so on, and I think that has happened for several months. I myself am interested to know your views, Honourable Member, perhaps we can discuss afterwards whether the diversion carried out is functioning or not? And actually that was a proposal from MPSP, although road enforcement is the responsibility of the JKR, but here we have multi-agency cooperation between all parties, and I hope the objective is to further smooth traffic flow. But if the Honourable Member has views, we can discuss them later, thank you.

Speaker (Speaker)EN

Thank you, next question, from the Pantai Jerejak constituency. As Pantai Jerejak is not present in the House, this question is passed over. Pulau Tikus, please proceed.

Lee Chun KitDAP · PHPulau TikusEN

Thank you Honourable Dato' Mr Speaker, my question is number 37. No. 37. Is the Penang State Government committed to drafting a suitable plan to help persons with disabilities (OKU) in finding employment? (a) What efforts and measures have been taken to ensure that assistance reaches OKU groups comprehensively?

Phee Boon PohDAP · PHSungai PuyuEN

Terima kasih, Mr Speaker. Saya menjawab soalan nombor 37. Kerajaan Negeri sentiasa komited dalam merangka pelan untuk membantu golongan OKU dengan mencari pekerjaan. Antara usaha-usaha yang dilaksanakan oleh Kerajaan Negeri adalah seperti berikut;

Program sokongan kerja Job Coach dan Disability Equality Training adalah digalakkan penyertaan OKU dalam masyarakat melalui sokongan pekerjaan. Sejak tahun 2017, sejumlah 27 OKU telah berjaya ditawarkan pekerjaan melalui program ini. Untuk menganjurkan Karnival Pekerjaan OKU seperti OKU Career Fair memastikan golongan OKU lebih berdikari dan berdaya maju dalam urusan pembangunan masa kini. Mengenalpasti OKU yang layak untuk diserap masuk dalam perkhidmatan latihan dan kemahiran pekerjaan di Bengkel Terlindung dan Pusat Latihan Pemulihan dan Perindustrian OKU serta program penempatan pekerjaan Job Coach dengan kerjasama Jabatan Tenaga Malaysia di dalam pelbagai bidang termasuk pengendalian makanan, pembuatan alat prostetik dan orthotik, elektrik dan elektronik, kraftangan, mencanting batik dan lain-lain. Menyediakan peruntukan bagi program peningkatan dan pemulihan ekonomi yang memfokuskan kepada peniaga-peniaga kecil termasuk golongan OKU yang berpendapatan kurang daripada RM3,000 sebulan dan telah beroperasi sekurang-kurangnya setahun. Bantuan peralatan bagi perniagaan sedia ada bertujuan untuk meningkatkan kapasiti/output perniagaan dan memberi bimbingan kepada kerjaya OKU melalui Penang Career Assistance and Talent Centre iaitu PenangCAT untuk mencari pekerjaan yang bersesuaian. Untuk memastikan bantuan sampai kepada golongan OKU serta menyuruh Kerajaan Negeri mengambil langkah-langkah seperti berikut; Jabatan Kebajikan Masyarakat (JKM) telah melakukan beberapa inisiatif seperti program Ad-Masjid untuk Muslim dan Rumah Ibadat untuk Non-Muslim pada setiap minggu Jumaat dan Sabtu bagi memudahkan orang ramai mendapat maklumat dan perkhidmatan daripada JKM seperti sejenis bantuan maklumat OKU, sukarelawan, kaunseling, pusat jagaan, taska dan sebagainya. Menyertai pameran-

pameran atau program-program kerajaan seperti booth di Seberang Perai Fiesta dan lain-lain dan juga JKM telah menganjurkan program-program kembara kebajikan itu. Sebuah program jelajah kebajikan di kawasan-kawasan yang terpilih bagi melakukan hebahan mengenai program-program kebajikan termasuk bantuan-bantuan kepada OKU. JKM telah memberi Elaun Pekerja Cacat (EPC) sebanyak RM400 kepada OKU yang bekerja dan gajinya tidak melebihi RM1,200 sebulan.

Speaker (Speaker)EN

Thank you, Sungai Puyu.

Lee Chun KitDAP · PHPulau TikusEN

Mr Speaker, may I ask a supplementary question?

Speaker (Speaker)

Boleh, sila.

Lee Chun KitDAP · PHPulau TikusEN

Thank you, the Honourable Sungai Puyu. I would like to ask a short supplementary question. Now, most OKU are working in OKU employment workshops, for which they receive the allowance that the Honourable Member just mentioned from JKM. There are many of these workshops, so will the State Government help these workshops to obtain more employment projects, because they are waiting for projects, as most of these workshops still find it difficult to obtain such projects? Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

The State Government has indeed had opportunities, as well as land and allocations, for the construction of workshops for certain associations. We also do match-making there. This match-making is about what we can take out from nearby factories to send goods there, so that OKU can do packing and so on. This has also been carried out by the State Government.

Speaker (Speaker)EN

Thank you, Sungai Puyu. Next, Sungai Pinang.

Lim Siew KhimDAP · PHSungai PinangEN

Thank you, Dato' Speaker. My question is No. 38. No. 38. The construction of the Penang Badminton Academy in the Sungai Pinang state constituency was announced in the 2018 Budget. (a) What is the current status of the Badminton Academy? Please explain.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, Mr Speaker, and also to Sungai Pinang. I will answer Question 38. The construction of the Penang Badminton Academy on the land adjacent to Lot 660, Lebuh Sungai Pinang 1, Seksyen 8, Daerah Timur Laut, with an area of 8,903 square metres, was announced in the Penang State Budget speech of 2018. The development cost of this academy will be financed by the private sector, with an estimated amount of RM22 million. For the information of the Honourable Member, several rounds of discussions have been held between the State Government and the private sector, namely the investors for this project, as the State Government's finances are considered too low compared with the profits of the private investors concerned. Accordingly, the construction of the Penang Badminton Academy is still at the consideration and discussion stage of the State Authority.

Lim Siew KhimDAP · PHSungai Pinang

Soalan tambahan.

Speaker (Speaker)

Sila.

Lim Siew KhimDAP · PHSungai PinangEN

My question is: since there have been several discussions and no solution has been reached, does the State Government intend to open a tender, because I have received many calls from people who are interested in the construction of a Badminton Academy in that area? And the second question is, what is the status of the construction of the badminton courts and basketball courts that were announced to be built at Desa Pinang 2 and Pinang Court? Thank you.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the supplementary question from Sungai Pinang. It is indeed a good proposal. If we refer to Ipoh, in Perak State there is a Lim Chong Wei Badminton Academy, which I have visited. The place is indeed good, because if there is an academy that can train our talents, we can discover more badminton talents who represent the State of Penang and even the country, such as Dato' Lim Chong Wei, Chan Peng Soon, Goh Liu Ying and others. The construction of this Badminton Academy is a good proposal, so we will tender it, because there may be many other parties who are interested. We will study it with CMI and the State Government, and we will proceed with this project to be tendered. We also welcome enthusiasts to organise badminton academies in the State of Penang, especially in the Sungai Pinang state constituency, because the Sungai Pinang state constituency has another badminton court construction project, with many requests. There is another badminton court construction project in the Sungai Pinang state constituency, namely on part of Lot 576 and part of Lot 552, Seksyen 8, Daerah Timur Laut, with an area of 11,200 square metres. The construction involves multi-storey car parks and 12 courts on the upper floor of the building. The construction cost is estimated at RM30 million. BYG Architecture Sdn. Bhd. has already been appointed as the consultant or architect for this construction project. The consultant or architect is now in the process of finalising the tender documents. We hope this project can be carried out as quickly as possible, and that we can be used by badminton enthusiasts. As for the basketball courts. The construction of basketball courts.

Speaker (Speaker)

Pembinaan?

Soon Lip CheeDAP · PHBagan JermalEN

The construction of covered basketball courts in Sungai Pinang was indeed announced in 2013, if I am not mistaken, by the former Chief Minister, where the construction of basketball courts was to be in three places: one in Sungai Pinang, one in Perkampungan Juru under the Bukit Tengah state constituency, and one in Taman Bukit Panchor, Nibong Tebal, Jawi state constituency. All three projects will be carried out, and I have written a letter to the government asking that these projects be maintained by the local authorities (PBT), namely under MPSP and MBPP. This is because, once these construction projects are completed, they will also be handed over for maintenance under MBPP and MPSP. This project will definitely go ahead. So, I will manage and expedite the construction of all three covered basketball courts at those three locations. That is all, thank you.

Speaker (Speaker)EN

Thank you. Bagan Jermal. Next, I would like to invite Bertam.

Khaliq Mehtab Bin Mohd. IshaqBERSATU · PHBertamEN

With the permission of Dato' Yang di-Pertua Speaker, my question is Question No. 39. No. 39. What is the status of the illegal factory employing foreign workers in Padang Benggali? (a) Did the authorities conduct an investigation and take action against the factory operator? (b) The factory operator neglected safety aspects by placing a rubbish bin at the roadside, which caused a fatal accident.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Thank you, Dato' Speaker, and thank you to my colleague from Bertam, who asked what is the status of the illegal factory employing foreign workers in Padang Benggali, and whether the authorities conducted an investigation and took action against the factory operator, and where, and also that the factory operator neglected safety aspects by placing a rubbish bin at the roadside, which resulted in a fatal accident. In answer to this, Dato' Speaker: according to information obtained from the Seberang Perai Municipal Council (MPSP), the illegal factory alleged to be employing foreign workers in Padang Benggali is still operating. MPSP has conducted an investigation and has issued a notice to the factory. And to ensure that this factory can operate legally, this factory has been listed in the factory whitening programme, which began on 3 January 2018 and will end on 2 January 2019. During this whitening period, the factory is required to resolve land issues and other conditions before submitting an application for planning permission to MPSP. If the factory fails to obtain a permanent licence after the end of this factory whitening programme, MPSP will take enforcement action against the factory. Dato' Speaker, the accident involving a motorcyclist and a roro-type rubbish bin occurred on 19 May 2018 at Jalan Padang Benggali. And based on information received from the Royal Malaysia Police, the accident occurred because the victim lost control and collided with a rubbish bin placed on the road shoulder. That is all, Dato' Speaker.

Speaker (Speaker)EN

Thank you, Datok Keramat.

Soalan tambahan.

Speaker (Speaker)

Sila.

Khaliq Mehtab Bin Mohd. IshaqBERSATU · PHBertamEN

With the permission of the Honourable Datok Keramat. My question is, have the authorities begun legal proceedings to bring the factory operator to court for the factory's negligence which caused a fatal accident? And for the information of the Honourable Datok Keramat: the roro rubbish bin should not have been at the roadside at the time the accident occurred, and the victim who died was a voter of mine in DUN Bertam. Thank you.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Regarding the question from Bertam on whether action will be taken by MPSP against the factory that caused the accident, at this stage no action has been taken by MPSP, Dato' Speaker. But I am of the view that, with regard to MPSP's jurisdiction, the issue concerns the factory operating illegally, where, as I have stated, a notice has been issued, and now an opportunity has been given for whitening, whether it can comply or not we will see. But returning to the question from my Bertam colleague, I did not know that this was our voter, and perhaps I, as a lawyer and former lawyer, can advise that this may be a civil action that can be taken. That is all, Dato' Speaker.

Speaker (Speaker)

Terima kasih.

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Supplementary. Thank you, Mr Speaker. I would like an explanation from Datok Keramat. In Sungai Dua there are also illegal factories. I visited one factory which was discharging paint or dye into a river. I see that sometimes the action by MPSP may be procedural, and it is sometimes slow and causes unease among residents and also those in the area of the illegal factories, in Desa Murni. The action is quite slow, and I ask that if possible, action be expedited, whether whitening and so on can be implemented in such a manner, a task force to resolve the illegal factory and foreign worker issue swiftly. These are two problems: foreign workers and illegal factories. The same thing is happening in Sungai Dua. Thank you.

Jagdeep Singh Deo a/l Karpal SinghDAP · PHDatok KeramatEN

Thank you, my colleague from Sungai Dua. Regarding enforcement action which may not be as fast as possible: I have a position, Dato' Speaker, as I stated the other day when I took over the Local Government portfolio, where both these PBT are under my supervision. I have instructed both these PBT that where enforcement action needs to be taken, it must be firm. So, regarding the question from my colleague from Sungai Dua, if there is indeed any delay or action is not taken quickly enough in the Desa Murni case, I will check and I will do what needs to be done. That is indeed my commitment, that firm action must be taken. I will check this specific case and I will get back to Sungai Dua. Regarding foreign workers, this is not an unfamiliar problem. We have had a problem with foreign workers for a long time, where they are not legal and work in factories that are also not legal, and this has become a very big problem for us. Of course, illegal foreign workers fall under the jurisdiction of Immigration and the Police, and they will take action periodically, Dato' Speaker. But there are legal foreign workers who work in factories and live in housing schemes and cause many social problems. I believe this is especially so in Seberang Perai, because there are many industrial zones in the area. This causes a very big problem. And therefore, enforcement action can be taken against those who live illegally in housing

schemes, but the problem is it is a chicken and egg situation. Because if we take action against them, they have to leave the scheme, but go where? They will go to the scheme next to it. So, it is a prolonged problem. So what we do, or the approach of the State Government, is that first we need to set up foreign worker hostels. And for the information of Dato' Speaker, so far there are five (5) applications to set up foreign worker hostels that we have approved. One (1) in the Island area and four (4) in the Seberang area, and of these five, Dato' Speaker, I would like to state that one CCC will be issued, and we hope in October next year, and from these five we hope they can provide 25,000 beds, Twenty Five Thousand Beds, with permission, so that we can address some of the problems, because of foreign workers in Penang. I am informed by the F&M industry and others that there are almost 200,000, so this is a starting point, and we will try to appreciate this problem. That is all, Dato' Speaker.

Speaker (Speaker)EN

Thank you. I would like to invite Air Itam.

Ng Soon SiangDAP · PHAir ItamEN

Thank you, Dato' Yang di-Pertua. My question is Question No. 40. No. 40. What is the status of the 1MDB land in the areas of Air Itam, Air Putih and Paya Terubong?

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you, Dato' Yang di-Pertua. To answer the question from the Honourable Air Itam regarding the status of the 1MDB land in Air Itam. I am pleased to inform this august House that, according to the records of the Penang Land and Mines Office, as of 18 July 2018, the land owned by 1MDB RE Air Itam Sdn. Bhd. in the State of Penang is as follows: There are three (3) titles in Mukim 13 Paya Terubong. Firstly, Lot 1457 with a total area of 166,047.00 square metres, the share owned by 1MDB is 11%, and the area owned by 1MDB is 18,265.00 square metres. Secondly, Lot 1584, the area of this lot is 62,726.00 square metres, and the share owned by 1MDB is 25%, or 15,681 square metres. And the last lot is 1561, with a total area of 244,276 square metres. The share owned by 1MDB in this lot is 25%, or ¼, and its area is 61,069 square metres. As of June this year, the Penang Island City Council (MBPP) has not received any Planning Permission Applications to develop all three of these lots. In addition, the State Government has also lodged a registrar's caveat to prevent any sale and purchase transactions for these lands. However, the Director of Land and Mines has received a letter from a lawyer dated 14 April 2018, informing that the company 1MDB RE (Ayer Itam) Sdn Bhd has changed its name to Ayer Itam Properties Sdn Bhd and requesting that these lands also be transferred into the new name, namely Ayer Itam Properties Sdn Bhd. However, the State Government has not yet implemented the process of changing the name on these lands.

Speaker (Speaker)EN

Thank you. Next, I would like to invite the Honourable Bukit Tengah.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Thank you. Mr Speaker, my question is Question 41. No. 41. What are the short-term and long-term plans to overcome serious traffic congestion, especially during peak hours on the roads? (a) Exit 160 Juru from the North–South Expressway; (b) Two-way traffic of Jalan Kebun Nenas – Jalan Chian Heng Kai – AutoCity/North–South Expressway; and (c) Jalan Bukit Tengah to Jalan Kebun Nenas.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you, Mr Speaker. To answer the question from the Honourable Member for Bukit Tengah, which raises issues similar to those raised earlier by the Honourable Member for Bukit Tambun, regarding short-term and long-term plans to overcome traffic congestion, especially during peak hours on the Juru Exit road and also Jalan Kebun Nenas, Jalan Chian Heng Kai, AutoCity and the North–South Expressway. For the information of this august House, the State Government takes the traffic congestion occurring on the Juru No. 160 Exit road from the North–South Expressway seriously. Two-way traffic on Jalan Kebun Nenas – Jalan Chian Heng Kai – AutoCity and the North–South Expressway, and Jalan Bukit

Tengah to Jalan Kebun Nenas. For that purpose, the State Government has drawn up traffic flow solution plans for the short term and long term as follows: (a) Short-Term Traffic Flow Solution Plan (i) Providing a 'greenwave' traffic light service from the junction of Jalan Bukit Tengah with Jalan Kebun Nenas to the junction of Jalan Perusahaan with Jalan Kebun Nenas; (ii) Widening the road for the left turn from the direction of Jalan Perusahaan into the PLUS Expressway entrance towards the North, by the Public Works Department (JKR); and (iii) Directing the Penang Development Corporation (PDC) to construct a road connection from the Penang Science Park area to Jalan Kebun Baru. This is because the road is an alternative route for vehicles from the direction of Perai to Penang Science Park/Batu Kawan and vice versa. The construction of the road will indirectly reduce the number of vehicles using Jalan Kebun Nenas. (b) Long-Term Traffic Flow Solution Plan (i) Widening the road and providing a contraflow on Jalan Kebun Nenas starting from the junction of Jalan Perusahaan to the PLUS Expressway exit towards the north; and (ii) The second point was also mentioned earlier by the Honourable EXCO Member for Tanjung Bunga, namely upgrading the 2-lane single carriageway to a 4-lane dual carriageway from Permatang Tinggi to Sungai Juru. In fact, there is a long-term plan, namely in the Halcrow Transport Plan. There is indeed a proposal to improve the Juru junction, but we have not yet made a decision on this proposal because it involves various parties.

Speaker (Speaker)

Terima kasih.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

With permission. Supplementary question. Thank you for the answer from YAB Chief Minister regarding the short-term and also long-term plans. I would like to ask regarding the short term. I see that now there are many places, not many places, several places that have already implemented a smart system because these areas are actually two (2) areas. In my area, the most jammed is at the traffic light system. So I understand that, as in the Federal Territory, they are now doing testing of the city brain, a system platform built by Alibaba company, and another one in Cyberjaya, the Smart Transportation System that can coordinate traffic lights, GPS, track traffic volume and it will accordingly set the traffic light. I would like to ask whether the Penang State Government has made any studies or made any preparations to bring us into the future, which I feel can also solve the traffic light problem and traffic congestion in my area. Thank you.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Thank you, Mr Speaker. Thank you for the proposal of the Honourable Member for Bukit Tengah. Indeed, the locations we mentioned earlier are one, two, three, four junctions that see a great many vehicles, especially at peak times. And indeed the State Government together with the Local Authorities is definitely planning to implement the smart city concept and the application of technology to urban management, including traffic management. And we believe this is the direction forward. And this is definitely in the plans of the State Government.

Speaker (Speaker)EN

Thank you, Padang Kota. I would like to invite question No. 42 from the Penanti area. As the Honourable Member for Penanti is not in the House, the question is skipped. I invite the Honourable Member for Telok Bahang.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

Mr Speaker, question 43. No. 43. Traders and hawkers are one branch of the local socio-economy. (a) What support programmes are carried out for traders and hawkers who are unlicensed?

(b) Actions after the management of unlicensed hawkers and traders. (c) Statistics of unlicensed hawkers and traders by district.

Thank you, the Honourable Member for Telok Bahang, who has raised the question about traders and hawkers as one branch of the local economy. The State Government welcomes the business activities carried out by traders and hawkers in an effort to improve the economic standing of each of them. For unlicensed traders and hawkers, the State Government, through both Local Authorities, MBPP and MPSP, has introduced the following support programmes: (i) Holding open interview sessions to give opportunities to unlicensed hawkers to carry on business activities within the Penang Island City Council (MBPP) complex; (ii) Implementing registration tagging for unlicensed hawkers who have been carrying on business before May 2010. These hawkers are also given priority to carry on business within the MBPP complex; (iii) Approving the proposal for Mobile Truck Licences to assist unlicensed hawkers in the MBPP area. (iv) Establishing the Guidelines for Mobile Hawking Methods and the Guidelines for Business Methods with the Concept of Food Trucks and Service Trucks to facilitate the approval of licences by MPSP for local citizens; (v) Opening and filling vacant commercial spaces of the MPSP Council every month and not imposing any licence fee for hawker licences; (vi) Advising these traders on suitable locations for business in line with the Mobile Hawker Guidelines of MPSP.

Next, after answering the second question. Actions after the management of unlicensed hawkers and traders. After management activities are carried out by both Local Authorities on unlicensed hawkers and traders, the remedial actions taken are as follows: (i) Placing the hawkers concerned in MBPP premises (subject to vacancies); (ii) Monitoring the areas concerned so that hawking activities do not recur; (iii) Distributing Hawker Licence Application Forms on site; (iv) Providing advisory services to attend the stall or public market interview sessions held every last weekend of the month; (v) Looking for suitable locations to do business in line with the Mobile Hawker Guidelines of the Local Authority (PBT); (vi) Encouraging traders to apply for hawker licences.

As for the answer to the third question, statistics of unlicensed hawkers and traders by district. The total number of unlicensed hawkers and traders in the State of Penang is 5,001 persons. For the Seberang Perai area, there are 2,180 traders, namely 683 in SPU, 1,146 in the SPT District and 351 hawkers in SPS. For the Island area, there are 2,821 traders, namely 2,007 in the Timur Laut District and 814 in the Barat Daya District.

Zolkifly Bin Md. LazimBERSATU · PHTelok Bahang

Soalan tambahan.

Speaker (Speaker)

Sila.

Zolkifly Bin Md. LazimBERSATU · PHTelok BahangEN

How many roadside hawker areas are licensed like at Jalan Hospital Besar Pulau Pinang? How many roadside spaces are licensed for hawkers like at Hospital Besar Pulau Pinang? Next to Hospital Pulau Pinang.

Telok Bahang has touched on the hawker stalls in front of Hospital Besar Pulau Pinang, which can be used as an example where the road boundary area in front of Hospital Besar Pulau Pinang has hawker stalls built. Telok Bahang's views will be taken into account for the Local Authority (PBT) to consider

such spaces that we can utilise, as long as they do not disrupt traffic and the cleanliness of the area.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai Dua

Soalan tambahan.

Speaker (Speaker)

Ketua Pembangkang.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Looking at the statistics, there are many small traders and hawkers. I think more than 5,000 – 6,000 persons in each district. So, seeing that there are so many traders like this, does the Local Authority or the State Government plan to provide more business sites for traders like those we have set up in the Hospital Pulau Pinang area, that is, to provide business areas. Perhaps they could build business centres. But the question is whether such planning exists. And also in terms of food trucks, many people are interested in doing business with these food trucks. Include it in the method of solving that problem. Does the Local Authority provide places where food truck traders can be placed? Food trucks cannot simply trade freely like that. They must have specific places under the control of the Local Authority. Thank you.

Thank you, Sungai Dua. Penang is indeed well known as a state that is prominent or famous for street food and also the food courts that we are truly known for. So, as Sungai Dua said just now, from time to time the PBTs will continuously identify areas for us to give space to local traders to trade. And for food trucks, in fact licences have already been approved in both PBTs. It is just that now the PBTs will announce the areas identified for these food truck hawkers.

Speaker (Speaker)EN

Please, Bayan Lepas.

Azrul Mahathir bin AzizAMANAH · PHBayan LepasEN

Thank you, Mr Speaker.

Speaker (Speaker)

Bayan Lepas.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

My supplementary question: just now the Dato EXCO mentioned the tagging system before 2010. Will this tagging system be able to, what is it, prevent these illegal traders from enforcement action? Especially in Telok Kumbar. Thank you.

I will refer to the PBT on how the implementation of this tagging registration will be carried out to overcome or fulfil the requirements of these unlicensed traders. So that they too will be given an opportunity later when there are vacancies. I will inform you.

Speaker (Speaker)EN

Thank you. I invite the next question from Teluk Ayer Tawar.

Mustafa Kamal Bin AhmadPKR · PHTelok Ayer TawarEN

My question is question no. 44. No. 44. Development of waqf land in the State Constituency of Telok Ayer Tawar. (a) What is the total amount of waqf land in the State Constituency of Telok Ayer Tawar? List the places and areas that are being developed. If any, describe the project in detail. (b) Are there still waqf lands that pose problems for development in the State Constituency of Telok Ayer Tawar?

Speaker (Speaker)

Jawab EXCO.

Thank you, Telok Ayer Tawar. Telok Ayer Tawar asks about waqf land for the development of waqf land in the State Constituency of Telok Ayer Tawar. The waqf land in the State Constituency of Telok Ayer Tawar totals 15 lots with a total area of 7.7 acres. At present, two lots of this land are being developed, namely on Lot 6247 and Lot 6249, Mukim 7, SPU in Telok Ayer Tawar, which are being developed with the construction of 2 blocks (8 and 12 storeys) of Lower-Medium Cost Apartments with a capacity of 152 units. This development project is financed by JAWHAR, the Department of Waqf, Zakat and Hajj, at a cost of RM38 million and is scheduled to be fully completed in November 2019. 10 more lots have been developed for various uses such as mosques, surau, residential houses, cemetery sites, agricultural land and religious schools. To answer the second question, are there still waqf lands that pose problems for development in the State Constituency of Telok Ayer Tawar? There are three (3) waqf land lots in the State Constituency of Telok Ayer Tawar that have not yet been developed, namely one lot of land for agriculture with an area of 0.462 acres and two (2) vacant land lots with areas of 0.01 acres and 0.055 acres respectively. The Penang State Islamic Religious Council (MAINPP) does not anticipate any problems in developing waqf land in the State Constituency of Telok Ayer Tawar. The details of the waqf lands in the State Constituency of Telok Ayer Tawar are as in Appendix A, which will be placed on the Honourable Member's table after the end of the oral question session.

Speaker (Speaker)

Terima kasih.

Mustafa Kamal Bin AhmadPKR · PHTelok Ayer TawarEN

Please, a supplementary question.

Speaker (Speaker)

Silakan.

Mustafa Kamal Bin AhmadPKR · PHTelok Ayer TawarEN

I would like to know, the three (3) agricultural land lots that have not been developed, are they being leased now and what is the value of that rental? And I am also informed that the apartment built by the council has been temporarily halted. Why was it halted? Next, so far, what is the current value of the waqf land owned by the Islamic Religious Council in the DUN of Teluk Ayer Tawar? That is all, thank you.

Thank you, Telok Ayer Tawar. For the first question, whether it is being leased, I will obtain the information. The second question is about.....(interruption).

Mustafa Kamal Bin AhmadPKR · PHTelok Ayer TawarEN

The apartment, which I am informed has been halted for a while.

There is a bit of a problem between the contractor and also the JKR in this issue. However, we hope it can be resolved before the completion period of two thousand, November 2019. And so far MAIPP has not carried out a reassessment of the land value of the three lots asked about just now, so far. I will provide information if there is a current value for that land. Thank you.

Speaker (Speaker)EN

Telok Ayer Tawar, turn off the mic. Please, Penaga.

Mohd. Yusni Bin Mat PiahPAS · PNPenagaEN

Thank you, Dato Yang di-Pertua. For my supplementary question related to this waqf land. I would like a little clarification. I understand that there is some waqf land under the Penang State Islamic Religious Council that has been acquired, whether by the government or by the private sector, for the purpose of development. So, is the waqf land that has been acquired replaced with land elsewhere, or is it only by paying compensation?

Try to repeat the question once more. Repeat once more.

Speaker (Speaker)

Fokus, fokus.

Mohd. Yusni Bin Mat PiahPAS · PNPenagaEN

Regarding the waqf land under the Penang State Islamic Religious Council, because I understand there is waqf land that has been acquired, whether by the government or by other parties, the private sector, for development purposes on that waqf land. So, is the waqf land that has been acquired replaced by the Islamic Religious Council, by buying other land, or merely by receiving monetary compensation? Please clarify.

Thank you, Penaga. Waqf land is in fact permanent property, and so far, according to my records, I will check whether there is replacement. Usually there is replacement, but I have no record of whether waqf land acquired for development purposes by the State Government. But I will obtain this information. But usually, if it is permanent land, waqf, we do not encourage it, or we simply have nothing to replace it with. But I will obtain the information asked, whether there have been such cases. Thank you.

Speaker (Speaker)EN

Thank you. Next, I would like to invite the next question from Permatang Berangan.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Honourable Dato Yang di-Pertua, my question is number 45: No. 45. How much revenue has been obtained from the collection of water surcharge since 2011? Please itemise the revenue by year from 2011 to 2017. (a) How does the government spend the revenue from the collection? (b) Does the government still intend to continue collecting the surcharge from the people at the same rate, or are there any proposals for an increase or decrease? Please explain with details.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Dato' Speaker, and also the Honourable Permatang Berangan. Thank you for the question on the collection of water surcharge revenue. For the Honourable Member's information, the State Government's revenue from water surcharge collection from 2011 to 2017 totalled RM84 million. The breakdown by year is as follows: For 2011, collection was RM8.37 million. For 2012, RM8.70 million. For 2013, collection was RM8.54 million. For 2014, collection was RM16.40 million, RM16.4 million, yes, million ringgit. For 2015, collection was RM15.29 million. For 2016, collection was RM15.14 million, and for 2017, collection was RM11.71 million. The overall total is approximately RM84 million. The revenue from the water surcharge collection has been spent in various ways. Among them, to implement education and water conservation programmes, to reduce the burden of water subsidies, which was RM90 million last year, RM98 million this year, a burden that has to be borne by PBA. We also run continuous water-saving campaigns through channels such as websites, Facebook, bulletins, pamphlets and so on. There are also water-saving programmes in schools, free distribution of "water saving devices", implementation of the "my PBA App" for user convenience and information dissemination, and the organising of events related to water use. So, in fact, a lot has been used from the surcharge collected. However, Honourable Member, the water surcharge implemented by PBA is not intended or aimed at making a profit. The main purpose of this collection is actually to reduce the rate of domestic water consumption. At present, the domestic water consumption per capita in Negeri Pulau Pinang is the highest in Malaysia, recording 276 l/c/d. This is data for 2017, compared with the national average of only 2019 l/c/d, and if we want to compare further, we look at Singapore, where water consumption is only 148 l/c/d. Moreover, Honourable Member, if we look at the recommendation of the United Nations, it actually recommends that water consumption should be only about 100. One hundred litres per capita per day (100 l/c/d). So, in other words, domestic water consumption in Penang is almost three times the recommendation of the United Nations. In other words, Penang people really like to waste water. The truth is that water is too cheap. So it is too easy to waste water. However, with the implementation of this water surcharge, we have reduced the consumption rate somewhat. If we compare with 2013, the consumption rate was 295 l/c/d. That is nearly 300, yes. Now we have brought it down to 276. And the surcharge collection will continue at the rate of 48 sen per 1,000 litres. PBA (Penang Water Supply Corporation) has not yet received any information from the National Water Services Commission (SPAN) to review the water surcharge rate to one ringgit per 1,000 litres (RM1 / 1000 litres). Thank you.

Honourable Member.

Speaker (Speaker)

Terima Kasih.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Thank you, the Honourable Member for Tanjung Bunga. I ask for a supplementary question. Could the Honourable Member elaborate on the current rate for commercial use? Is it the same as domestic? Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Member. As the question is rather specific and that information is not with me, I will give that information to the Honourable Member. Thank you.

Speaker (Speaker)EN

Thank you, Tanjung Bunga. Next, I would like to invite Permatang Pasir.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Thank you, Dato' Speaker. My question is number 46. No. 46. I request the State Government to state the government's plans to improve the quality of football of the Penang team for each team under the management of the Football Association of Penang? (a) I request the State Government to state whether the government intends to increase the expenditure allocation for the management of the Penang Senior Football Team for this year?

Soon Lip CheeDAP · PHBagan JermalEN

Thank you to Permatang Pasir. So, I will answer question 46. The State Government's plans and programmes in efforts to improve the performance and quality of the Penang Football Team (FAP) are as follows: First, the State Government is in discussions to settle part of FAP's debts that remain unpaid to the players. Second, to prepare a short-term and long-term planning action plan for football development programmes in Penang together with the stakeholders. Third, the State Executive Council (MMK) will be involved in the management of FAP. Fourth, to monitor the development of FAP periodically to ensure that FAP's financial status and performance in the Liga Perdana, Liga Super and Liga FAM are under control. Fifth, to provide sports science services in cooperation with the Penang State Sports Council (MSNPP) to improve players' endurance and physical performance. Sixth, to implement the Programme for the Preparation of Reserve Athletes and State Athletes in cooperation with MSNPP and the Youth and Sports Department. Seventh, to plan new strategies and approaches in efforts to improve the performance of the Penang football team. So far, the State Government does not yet have certainty regarding the allocation to the Football Association of Penang for this year. As of 13 July 2018, the State Government has spent RM2,829,000.00 on FAP to help them solve expenditure problems for FAP players.

Speaker (Speaker)EN

Please, Permatang Pasir.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

With permission, I have a supplementary question. Mr Speaker, my question is, does the State Government encourage, what are the State Government's steps to encourage private companies or GLCs in Penang to sponsor the Penang football team? Because what I see is that this sponsorship or high expenditure is an important element in developing a football team. If we look, for example, at how in Johor, JDT was developed using a large amount of money. If we take this year, I went to watch at the stadium. I saw that the jerseys of the Penang team were blank. Like the Permatang Pasir team's jerseys, there is no sponsor. Compared with other teams. So high expenditure is important. We must take note that football is a commercial product for the State Government itself; in the long term it will bring high profits to the State Government and will also help social growth among young people and the younger generation, because if we become a strong team, a famous team... it will provide a role model.... (interruption).

Speaker (Speaker)EN

Member for Permatang Pasir, your supplementary question is finished.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Okay, a role model for young people to venture into sports and keep them away from negative activities. That is why I asked my question, what is the State Government's plan to encourage any private companies or GLCs to sponsor the Penang team.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the supplementary question from the Member for Permatang Pasir. It is a good question. Indeed, the State Government always encourages all sports associations, including FAP, that if possible their programmes or activities can encourage sponsors or projects from CSR, private companies or corporate companies to sponsor items such as jerseys and others, and this depends on management. If the management system of an association is correct and accountable, they will go out and look for sponsors to sponsor their jerseys or sponsor part of the association's expenditure, and they should not rely entirely on allocations from the State Government. If an association such as FAP relies entirely on allocations from the State Government, then there are many other sports associations; we have 40 sports. If each association asks for RM1 million from the State Government, 40 associations would have to ask for RM40 million. But we have spent a lot on FAP because we want to help FAP, we want to help the names or players in the football association, so we encourage FAP so that they too can look for their own sponsors to bear part of FAP's expenditure. For the time being, because FAP does not have a president, they must appoint a president as soon as possible, and the State Government will also help so that we will nominate suitable presidents to take up the post, because an association is indeed about leadership.... (with permission), Dato' Speaker, correct, to help.

H’ng Mooi LyeDAP · PHJawiEN

Supplementary question. Given that FAP has been facing financial problems all this time, and the State Government has also been providing allocations to FAP all this time. My question, which has actually been answered by the EXCO, is: if the State Government can nominate a president for the FAP President, then I suggest that the candidate should have a background in football, and possibly like the Honourable Member for Sungai Bakap, who also has talent in football and is also President of SPS football, so I am not sure whether his nomination will be made in the MMK or somewhere else. If possible, I nominate the Honourable Member for Sungai Bakap.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

I see the Member for Sungai Bakap seems to play rugby.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the supplementary question and the suggestion from the Member for Jawi. The State Government has indeed not yet made any decision on the candidate for president, and this is indeed one of the good suggestions because the State Government is also looking for talent who truly understand football and are capable and accountable, so that leadership is indeed important because they must bring good name to the football association and to the name of football in Negeri Pulau Pinang. And this candidate is one proposed by the Member for Jawi; we will consider whether we will give the Member for Sungai Bakap the position of president, and we agree that if we look for someone to be president, they must have a background like the Member for Sungai Bakap, who is President of NTFA in Nibong Tebal. This is one of the proposals, NT, Nibong Tebal, not anti, you know, NTFA. This is also one proposal that the State Government will consider so that we together can advance or restructure the new FAP in Negeri Pulau Pinang. Thank you.

Speaker (Speaker)EN

Thank you. The Member for Bayan Lepas.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, Dato' Speaker. My question is number 47. No. 47. Public amenities in KADUN Bayan Lepas are still plagued by the absence of a post office and a bank. There is also no petrol station on the main road from Bayan Lepas to Teluk Kumbar. (a) Can the State Government help to establish these facilities? (b) Can the government make an offer of a place/location to the utility companies? (c) Does the government have any plans?

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Dato' Speaker. Thank you to my colleague, the Member for Bayan Lepas, who asked about public amenities in KADUN Bayan Lepas that are plagued by the absence of a post office, a bank and a petrol station, and whether we can help establish them. To answer this question, the State Government, Dato' Speaker, does not have the power to establish the opening of a post office, bank and petrol station in KADUN Bayan Lepas. These services are beyond the direct control of the State Government. The opening of a post office is based on basis and criteria including demand and the suitability of the required service, while the opening of a bank takes into account demand and the profit that can be generated. Nevertheless, Dato' Speaker, the State Government can help the relevant parties by providing advisory services to them to operate the facilities, as well as suggesting suitable sites for the relevant parties to open a post office and bank. Thank you, Dato' Speaker.

Speaker (Speaker)EN

Thank you. The Member for Bayan Lepas.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, the Member for Datok Keramat. I have only been entrusted by the people to bring facilities there. I hope the Member for Datok Keramat can help DUN Bayan Lepas obtain the facilities that were previously available. Previously there was already a post office and a bank, but due to road widening, both facilities are gone. I hope the Member for Datok Keramat can help. Thank you.

Speaker (Speaker)EN

Thank you, the Member for Bayan Lepas. I still want to call the Honourable Member for Berapit.

Heng Lee LeeDAP · PHBerapitEN

Thank you. My question is question number 48. No. 48. Sports activities are increasing. Considering that 2 persons at the Port Dickson International Triathlon 2018 drowned and a participant in the Kajang City International Marathon died after being hit by a car. (a) State in detail the State Government's current guidelines and SOPs when approving sports activities such as swimming across straits, running, cycling, triathlon, hill climbing and so on.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you, the Member for Berapit. I will answer question 48. The State Government always gives priority to safety aspects in any organisation of sports programmes for all in Negeri Pulau Pinang, and this is recognised by the MMK Youth and Sports Committee. The safety aspects emphasised include the safety of participants, organisers, technical staff, spectators, road users and public property at the location of the programme organised. For each application received by the MMK Youth and Sports Committee, it will go through a screening and vetting process of the proposed event paper before being submitted for programme recognition by YB. the Chairman of the MMK Youth and Sports Committee of the State of Penang, that is, me. The important factors that determine the success of a programme, such as financial position, the technical capability of the organiser, the number of target participants and related information, must be declared by the organiser to this committee. The organiser is required to attach the following documents for the committee's consideration;- (i) Background of the association / company; (ii) List of names of the Management Committee members; (iii) Organising budget; (iv) Route map; (v) Copy of the application letter issued by the organiser to the Royal Malaysia Police (PDRM); (vi) Copy of the application letter issued by the organiser to the Local Authority Engineering Department; (vii) Letter of appointment of certified emergency personnel; (viii) Letter / document / note of permission from the owner of the location / venue / area where the programme is held; (ix) Permission letter obtained from the Royal Malaysia Police (PDRM); (x) Permission letter obtained from the Local Authority; (xi) Letter of support issued by the Malaysian Sports Commissioner; (xii) Letter of support from the Penang State Sports Association (if the sports association is involved); and (xiii) Obtaining coverage from an insurance company for public liability. The MMK Youth and Sports Committee has also stipulated that each programme organisation must go through at least two (2) or more Programme Coordination Meetings involving the attendance of all representatives from public agencies and Local Authorities to ensure that the level of safety and smooth running of the programme is complied with 100%. For the Honourable Member's information, compliance with this stipulation is in line with the rules stipulated in Act 576, Sports Development Act 1997 under the Malaysian Sports Commissioner involving the Sports Development (Licensing) Regulations 2015. In addition, the Local Authority will give approval for the following matters;- (i) Coordinating approval to close roads with the Royal Malaysia Police if the sports activity involves road closures; (ii) Advertising permits for promotions of sports activities to be carried out; (iii) Temporary permits for the installation of canopies / tents; and (iv) Entertainment permits if the sports programme carried out has entertainment activities such as singing.

Heng Lee LeeDAP · PHBerapitEN

Supplementary question. Honourable Member, given that many procedures must be gone through by applicants for sports activities. So, is there a guideline for the period from each application arriving, each application being approved, for example if the applicant arrives at the MSN, the Public Works Department (JKR) or PDRM. Has a clear guideline been established, and my second question is, does the MMK Youth and Sports Committee have a plan to set up a One Stop Centre... (with permission) to facilitate all such applications.

Soon Lip CheeDAP · PHBagan JermalEN

Thank you for the supplementary question from the Member for Berapit. I will answer the first question first. For the first question, indeed every organiser must obtain approval from the Malaysian Sports Commission if the application for the sports event involves or is of international standing, such as the International Marathon Run. The application must be submitted to the Malaysian Sports Commission three (3) or six (6) months before the event is held. Meanwhile, local sports events must be submitted at least two (2) or four (4) weeks before the event is held. As in the example from this morning, my office was informed that today there is one (1) technical meeting organised by Penang Adventist Hospital together with the Penang State Legislative Assembly for the Kebun Bunga area. On 9 August there is one (1) technical meeting. They will hold a running programme, the Larian Amal Charity Red Socks Run, on 23 September 2018, Sunday, at 7.00 a.m., starting at Adventist

and ending at Gurney Paragon Mall. Under the Sports Development Act, the Commission ensures, or the main requirement for every organiser is, that they must apply to the Sports Commission before obtaining approval or before holding any press conference or announcement on the programme. If the programme does not obtain approval from the Malaysian Sports Commission, then the programme is unlawful, or if any companies that breach this section are involved, under Section 36 Amendment they will be fined not less than RM50,000.00 or a maximum of not more than RM500,000.00, or imprisoned for a period not exceeding 5 years, or both. This is because we do not want anyone at all as organisers, including the government, including the local authorities (PBT), including the State Assemblyman's office (ADUN). If they want to organise a programme, they must send a letter to the Sports Commission to apply, and they must also copy it to the State Executive Council (MMK) office for Youth and Sports. So for the time being we still have this letter, because we were only informed this morning that there is one (1) technical meeting. This is one example, because they should obtain a letter of approval from the Sports Commission first, and only then hold a technical meeting. If they do not have, if they do not receive a letter from the Sports Commission, then this programme cannot be carried out. Or if any accident occurs, who will bear responsibility? The organiser, or the chairman, or the company. It must be borne. It will be penalised under Act 36 here. So I hope all organisers, whether event companies…(with permission), Dato' Speaker, the local authorities themselves wanting to organise, or the government wanting to organise, such as the Torch Run (Larian Obor) that was organised in July last year, I myself applied for approval from the Sports Commission. So here, I was informed, for example, that this Penang Adventist Hospital together with the ADUN area of Kebun Bunga still have not obtained the Sports Commission's agreement. Therefore, we ask that they list all the conditions and compile what needs to be submitted to the Sports Commission, as per this checklist, and obtain approval as quickly as possible. This is one example of the checklist that our office has prepared. Any organisers or companies who are interested in organising their programmes may come to my Service Centre to obtain this checklist. What are the document requirements to be submitted to the Sports Commission. Second question.

Heng Lee LeeDAP · PHBerapitEN

The second question is whether the Youth and Sports State Executive Council (MMK) has any plan to set up a One Stop Centre to facilitate all applications relating to several government departments such as JKR, the Police and so on.

Soon Lip CheeDAP · PHBagan JermalEN

Indeed, on 20 July 2018 there was a first visit I made, a courtesy call and the Regional Speaker, to the Director and/or Chief Commissioner of the Malaysian Sports Commission, Dato' Zaitun, and we asked whether we could shorten or expedite these applications, or whether a One Stop Centre would be easy. It is easy. Indeed, the procedure is that all organisers must follow the document requirements that must be present and send them to the Sports Commission; applications can be made online. After that, the Royal Malaysia Police (PDRM) will issue an approval letter, the local authority (PBT) will issue an approval letter, and the subsequent procedures are to hold a technical meeting and also the announcement of the programme, on which date and at what time. So indeed, if this type is followed, one can indeed obtain a supporting or approval-friendly letter from the Malaysian Sports Commission. Mr Speaker: Thank you, Bagan Jermal. Honourable Members, the one hour thirty minutes for oral questions has now ended in accordance with sub-rule 26 (7) of the Standing Orders of the Penang State Legislative Assembly.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Mr Speaker, the oral questions answered just now will be placed on the desks of the Honourable Members. Mr Speaker: Honourable Members, we are still in the winding-up session. I would like to invite the Honourable

Member…(interruption).

Satess A/L MuniandyDAP · PHBagan DalamEN

Mr Speaker, before proceeding to the winding-up, I would like to report one matter to Dato' Mr Speaker. There is a newspaper that has still not learned its lesson, Utusan Malaysia, which reported what we have discussed in this House, misleadingly, with the aim of showing that I am

as a person who opposes national schools, or misleading, saying that yesterday it was reported in Utusan Malaysia and reported by Mohd. Firdaus Ismail. The facts are wrong. He stated that I, as it were, told the State Government to pressure the Federal Government, and it was stated that in my area there are three (3) schools including…(interruption). Mr Speaker: Honourable Bagan Dalam, you may make an explanation later on…(interruption).

Satess A/L MuniandyDAP · PHBagan DalamEN

Dato' Mr Speaker may reprimand such parties who always in what I …(interruption). Mr Speaker: I, I do not want to accept any more reports of the kind that want some explanation on issues that arise. The Honourable Member may use the House's press conference to do so. I would like to ask the Honourable Member to proceed with the winding-up.

Yeoh Soon HinDAP · PHPaya TerubongEN

Honourable Mr Speaker, honourable colleagues, State Assembly Members, heads of state departments, government agencies, and respected ladies and gentlemen. Greetings of peace, greetings of hope, and greetings from Penang. I would like to record my highest appreciation to this honourable House for being given the opportunity to deliver the winding-up speech to answer the supplementary questions on tourism, heritage, culture and the arts issues raised during the debate session. Thanks to the efforts of the Penang State Government, Penang has now become a very popular tourist destination with its own attractive products. Penang is a state rich in unique cultural, heritage and artistic traditions that are not found in other states or other countries. Since George Town was named a UNESCO World Heritage Site, we can see many local and foreign tourists who have visited Penang. The number of passengers at Penang International Airport has increased year by year. The State Government intends to strengthen and further develop the cultural, heritage and arts tourism industries holistically, using sustainable principles in line with the recommendations of the United Nations, or the Persatuan Bangsa-Bangsa Bersatu, with permission. Development of the Arts. Honourable Dato' Mr Speaker, in response to the suggestion of Honourable Pulau Tikus that the State Government make the State of Penang a performing arts hub. The State Government indeed has such an intention. The State Government will develop the Penang Art District as a catalyst in the creative industries, including performing arts, in Penang. The State Government has identified a parcel of land measuring 9.2 acres adjacent to Jalan Macallum and the Tun Dr. Lim Chong Eu Expressway to house the Penang Art District with a container city concept, and equipped with landscaped gardens. The Penang Art District will house the largest collection of art galleries, cultural museums, art and music studio exhibition spaces, art schools and art workshops in Malaysia. The Penang Art District will enhance the artistic and cultural value of Penang through the involvement of artists, craftsmen, educators and the general public in arts programmes. This project is now in the process of obtaining approval for the building plan before construction will and can also be carried out.

Gooi Zi SenDAP · PHPengkalan KotaEN

Seeking clarification. Thank you, Honourable Paya Terubong, for raising the development of the Penang Art District, which is located in the Pangkalan Kota area. I indeed extend congratulations and well done for the State Government's efforts in developing the Penang Art District as a catalyst in the fields of arts, culture and heritage. However, I hope that more discussions can be organised, especially with arts communities in Penang, so that we can obtain more views, so that the development of this Penang Art District can become a comprehensive development to meet the needs of various parties, especially from the arts community. Thank you.

Lee Chun KitDAP · PHPulau TikusEN

May I, Dato' Mr Speaker, seek to interject? Okay, I thank the Honourable Paya Terubong for responding to what I raised in this honourable House, but I would also like to ask that the Penang Art District and all the places that will be built for art can be accessible to independent artistes and will not be monopolised by possibly several production houses…(with permission), alone, because we want all artistes to have access to

show their talents to the public so that we can groom new talents with, with hubs like these. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you to Pengkalan Kota and Pulau Tikus. Indeed, Penang State is a state that is free to hear other views in particular. Therefore, it is not a problem for us to invite all parties or industries to give their views on the development of this Penang Art District. The State Government will support the organisation of more arts, cultural and heritage programmes. The State Government is aware that organising arts, cultural and heritage programmes incurs significant costs and may not necessarily give due returns compared with the expenditure. Nevertheless, the State Government will still not neglect the development of arts and culture in this state. The State Government will cooperate with the private sector in organising more programmes and to sponsor part of such expenditure. A younger generation is needed to inherit the arts, culture and heritage so that they remain and are not forgotten by society, and at the same time become a major tourist attraction. The State Government encourages the involvement of school students to inherit local arts, culture and heritage. Apart from professional dance groups, schools are also invited to perform at official State Government events such as the Tea Party Ceremony in conjunction with the birthday of His Excellency the Governor (Tuan Yang Terutama), the Hari Raya Celebration ceremony, and the reception of foreign delegations visiting Penang. This platform gives school students the opportunity to show their talents and enables the arts of Penang State to be inherited and passed down to future generations. The State Government will endeavour to develop tourism based on the arts and culture of Penang State. It has the advantage of developing tourism based on arts and culture because there is a fact that cannot be denied that Penang is a notting port…(with permission), which has a multi-racial culture. We do not only have Chinese, Malay, and Indian culture. We also have festivals such as Thaipusam, Vaisakhi, Hungry Ghost Festival, Gawai festival and so on. In addition, the State Government also organises international festivals and cultural programmes such as the Japanese Bon Odori festival held last month and also the Thai Festival to be held at the end of this month. In addition, I have also received feedback…(with permission), from the Korean community living in Penang to organise a Korean Festival in Penang. In this regard, we can feel confident that Penang can be placed as one and made the Cultural Capital of Asia; and will further attract tourists through cultural, arts and heritage activities that are so rich in diversity. Besides that, in the near future the State Government under the State Executive Council (MMK) for Arts has also studied the establishment of a Penang Arts Council, or known as the Penang Art Council…(with permission), whose members will consist of arts practitioners and artistes from Penang. This body aims to play a role as a driver of the arts to promote Penang's arts industry to every corner of the world. The functions of this Arts Council include serving as a reference for arts practitioners to voice their problems and becoming a focal point for gathering and creating works. This proposal is not only a positive matter for all parties, whether arts practitioners or the State Government, to form a more orderly arts ecosystem. Honourable Dato' Mr Speaker, to answer the question of Honourable Pengkalan Kota again regarding the future direction of the Sia Boey site, the State Government intends to establish the Sia Boey Archaeological Gallery as a centre for exhibition and interpretation of artefacts that enables the general public and tourists to appreciate historical remains. Interactive programmes and activities will also be planned to educate the public on shared responsibility in protecting and managing Sia Boey to ensure Penang's cultural heritage is preserved. Since May this year, the State Government, through George Town World Heritage Incorporated in cooperation with the Penang Development Corporation (PDC), has been carrying out the work of filtering rubbish and sludge at Sia Boey that was dug out from the Prangin Canal. This work is being carried out simultaneously with the conservation and rehabilitation works of the Prangin Canal as part of the first phase project under the Sia Boey Rejuvenation Project. This filtering process aims to record historical and cultural materials in the Prangin Canal using scientific archaeological methods in narrating the story of Sia Boey and early society. The State Government through PDC will carry out conservation work on Prangin Market, the market hall…(with permission), and landscape work in the Sia Boey area in the fourth quarter of 2018. In addition, the State Government is also planning conservation and restoration works for the shophouse buildings in Sia Boey to be implemented in the second phase of the Sia Boey Rejuvenation Project, which will begin in 2019. Apart from Sia Boey, there is also the Clan Jetty located in Pengkalan Kota. I care very much about Pengkalan Kota. The State Government, in cooperation with the George Town Conservation and Development Corporation (GTCDC), has a comprehensive plan for the development of the entire George Town UNESCO World Heritage Site. George Town plays a role in ensuring the heritage site is preserved and restored properly, while taking into account its economic and tourism contribution to the State of Penang. This is because the Clan Jetty area is a historic area formed as a result of the way of life of the local community which contributes to heritage activities in George Town City, which indirectly attracts tourists to the area. However, any development activities to be implemented must use the best methods to ensure the heritage value of Clan Jetty is preserved and maintained. GTCDC is working with Universiti Sains Malaysia (USM) to carry out a comprehensive ecological study of the area before upgrading works are carried out in that area. At the same time, the State Government will cooperate with GTCDC, MBPP, the local community and NGOs to ensure sustainable development in the area by taking into account the lives and activities of the local residents in the jetty area. It is also to ensure holistic development that complements the waterfront development and the redevelopment of the Sia Boey area. For the information of Pengkalan Kota, public consultation or consultation with the local community, including the Member of Parliament and the ADUN of the area, will also certainly be carried out. As for the Heritage House mentioned by Telok Ayer Tawar, I will ask MBPP and also the Heritage Department to take note of and study the suggestion from Telok Ayer Tawar. The Honourable Telok Ayer Tawar will be invited to join this effort. In addition, for good news for Telok Ayer Tawar, the State Government's cooperation also indeed has the intention to develop Pantai Robina Eco-Park, which will be equipped with a bicycle track, children's playground, solar decorative lights, and also a skating rink and a futsal court.

Khaliq Mehtab Bin Mohd IshaqBERSATU · PHBertamEN

With permission, Deputy Speaker, I seek to interject. Honourable EXCO, just one, I would like to request and inform that in the town of Kepala Batas there are many heritage buildings (with permission)… old heritage buildings especially in the town center old town center. And if permitted and if possible, I request that the EXCO for Tourism take note of these buildings, firstly in terms of restoring the heritage buildings, and secondly when these buildings have been restored and beautified, the tourism industry in Kepala Batas can develop. That is all. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

Kawasan Kepala Batas memang juga tidak akan ditinggalkan, kita akan jemput Honourable Member untuk sama-sama mengkaji cara memulihkan bangunan-bangunan di kawasan Bertam, Kepala Batas. Mr Speaker, selain daripada pelancongan di bahagian Pulau, Kerajaan Negeri juga turut giat mempromosikan pelancongan di Seberang Perai. Bukannya satu masalah untuk Kerajaan Negeri membangunkan sektor pelancongan di Seberang Perai. Memang kita sama-sama Negeri Pulau Pinang, tidak beza di antara pulau dan bahagian Seberang…(interruption).

Heng Lee LeeDAP · PHBerapitEN

Please clarify, Honourable Paya Terubong, kerana tentang tadi Seberang Perai seperti apa Honourable sentuh, satu Induk Master Plan untuk pelancongan di Seberang Perai. Pandangan saya ialah semua pelancongan, semua Industri Pelancongan mesti merangkumi sistem jalan raya. Dan buat masa sekarang, sistem pengangkutan awam di Seberang Perai adalah tidak lengkap seperti yang ada di bahagian pulau. Jikalau satu induk, satu Pelan Induk Pelancongan diadakan di Seberang Perai tetapi tidak merangkumi sistem pengangkutan awam yang lengkap, ini akan menjadi satu masalah kepada orang tempatan. Seperti saya yang pergi ke Sepetang, Kuala Sepetang, ya, jadi semasa hari Sabtu dan Jumaat tempat itu penuh dengan pelancong, sampai semua datang dengan bas. Dan sampai orang tempatan nak cari tempat untuk letak kereta pun susah, ini akan menjadi satu gangguan kepada orang tempatan. Jadi saya minta juga penjelasan atau penjelasan daripada Honourable Paya Terubong. Terima kasih.

Yeoh Soon HinDAP · PHPaya TerubongEN

Terima kasih Berapit. Memang tidak dinafikan bahawa sistem pengangkutan yang lengkap dapat compliment terhadap Sektor Pelancongan. Jadi untuk satu Pelan Induk membangunkan sektor pelancongan di kawasan Perai memang strategik, bahawa satu Pelan Induk Pengangkutan juga akan diperlukan untuk

merangkumi Seberang Perai dan juga sebelah Pulau, supaya connectivity dapat dilancarkan dengan lebih tersusun. Dan untuk sistem pengangkutan ini, memang satu perancangan holistik juga perlu dikeluarkan untuk secara keseluruhan…(interruption).

Gooi Hsiao-LeungPKR · PHBukit TengahEN

With permission, mohon untuk mencelah. With permission Dato' Speaker, saya tertarik dengan soalan daripada Honourable Berapit. Saya just nak penjelasan sedikit. Jadi untuk Pulau Pinang setakat ini, saya ingin mendapat penjelasan sama ada kita mempunyai satu Pelan Induk Pelancongan bagi Pulau Pinang? Sebab saya merasa bahawa kita harus mempunyai satu rancangan ke depan, di mana seperti di George Town, saya difahamkan kita sekarang menghadapi banyak pelancong. Mungkin satu hari George Town ini sendiri akan menjadi satu tempat yang terlalu mahal untuk orang-orang George Town Pulau Pinang menduduki, dan kita akan melihat ramai penduduk-penduduk tempatan yang akan pindah ke tempat lain. Seperti kita lihat apa berlaku di Venice sekarang ini. Jadi perkara ini juga akan mempunyai kesan kepada Seberang Perai dan sebagainya, dan so saya nak tanya sama ada kita mempunyai satu Rancangan Induk untuk Pelancongan Pulau Pinang. Terima kasih.

Yeoh Soon HinDAP · PHPaya TerubongEN

Terima kasih Bukit Tengah, saya akan bentangkan dalam ucapan saya sebentar lagi. Mr Speaker, kawasan Seberang Perai memang kaya dengan keindahan alam semula jadi, dan dalam bidang pelancongan ecotourism amat berpotensi untuk dibangunkan. Mengenai saranan untuk memberi tumpuan kepada pelancongan di Seberang Perai dan bukan hanya di bahagian pulau, seperti yang dibangkitkan oleh Honourable Bagan Dalam, suka saya nyatakan bahawa Kerajaan Negeri memang memberi tumpuan kepada perkara tersebut. Antaranya adalah aset-aset pelancongan eko atau ecotourism di Seberang Perai seperti Taman Negeri Bukit Panchor, Taman Rimba Bukit Mertajam, Hutan Pelajaran Air Itam Dalam, yang telah dikenal pasti oleh pihak Seberang Perai Municipal Council (MPSP). Namun begitu, sebagai Kerajaan Negeri yang open minded… (with permission) saya memang welcome semua idea daripada ADUN-ADUN Seberang Perai untuk bekerjasama membangunkan negeri, lebih-lebih lagi tarikan-tarikan di Seberang Perai. Saya juga ingin…(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Minta laluan. Honourable Paya Terubong, mengenai dengan apa yang dicadangkan oleh MPSP, ada juga tempat-tempat lain yang menarik di Seberang Perai seperti kita ada Pasar Bisik. I think tidak ada satu Pasar Bisik di mana-mana bahagian di Malaysia atau di Asia yang ada, di mana nelayan membawa hasil lautan mereka datang ke pantai dan mereka membisik, pembeli perlu membisik. Ini adalah satu unik. Dan apabila pada tahun 2016 MPSP menganjurkan Seberang Perai International Conference Ecotourism and Conservation Efforts, kita ada membawa sekumpulan I mean ataupun delegasi yang datang dari luar negara dan dalam negara ke tempat tersebut. Mereka cukup tertarik, dan saya hairan sehingga kini tiada apa-apa usaha telah dilakukan oleh Tourism Malaysia mahupun Kerajaan Negeri untuk menjadikan ini sebagai satu produk ekopelancongan. Dan juga di Penaga ada tempat arkeologi, tapak arkeologi, di mana di dapati The Penang Gourmet itupun boleh dipromote sebagai satu destinasi pelancongan, menunjukkan di Seberang Perai adalah salah satu sudah ada tamadun 3,000 atau 4,000 tahun dahulu. One of the earliest civilization in this region itu sahaja.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

With permission Dato' Speaker, sekiranya ada related lah kepada isu yang dibawakan, saya harap Yang Berhormat Menteri boleh mengambil perhatian. Menteri pula minta maaf, EXCO sudah naik taraf promoted. Minta maaf kepada Honourable EXCO untuk mengambil perhatian kepada kawasan di Kuala Juru, sebab Kuala Juru ini saya rasa adalah satu tempat yang masih belum discovered, belum lagi ditemui. Sebab di Kawasan Bukit Kuala Juru ini kita ada kawasan yang sama, kita ada satu bukit hutan simpanan. Di bawah bukit ada satu kuala nelayan, Kuala Juru, dan di sekeliling bukit itu ada kampung-kampung lama Melayu yang saya rasa sangat-sangat berpotensi untuk dimajukan sebagai satu tempat pelancongan, yang pelancong-pelancong boleh melawat. Program satu hari: pergi ke Kuala Juru, duduk di kampung, rumah-rumah yang berwarisan, lepas itu naik bukit, turun bukit, boleh pergi ke Kuala Juru nelayan, go on the boat ride, comeback, seafood. So it can be developed into a really really good ecotourism, warisan tourism area for Pulau Pinang khususnya di Seberang Perai. So, saya mungkin nanti Honourable EXCO boleh buat satu lawatan, saya sendiri boleh ikut bersama untuk menunjukkan kawasan-kawasan tersebut. Terima kasih.

Speaker (Speaker)EN

Terima kasih kepada Ahli-ahli Berhormat yang lain. Saya rasa suara wakil rakyat daripada Seberang bersabit dengan pelancongan sangat jelas. Saya minta Honourable Paya Terubong untuk gulung.

Yeoh Soon HinDAP · PHPaya TerubongEN

Terima kasih Mr Speaker. Saya memang bersyukur saya mempunyai sahabat-sahabat yang begitu baik, tolong saya untuk memberi idea-idea baru untuk membangunkan pelancongan di kawasan seberang. Saya mempunyai satu keyakinan bahawa pelancongan di Seberang Perai tetap akan dibangunkan dengan lebih baik dengan kerjasama dari sahabat-sahabat semua. Kerajaan Negeri akan terus usaha untuk mewujudkan lebih banyak lagi, bukan sahaja untuk membangunkan tarikan-tarikan baru di kawasan-kawasan di Seberang Perai. Kita juga akan terus mewujudkan lebih banyak lagi program pelancongan di Seberang Perai. Antara program-program akan datang adalah termasuk bantuan dan sokongan akan diberikan kepada Penanti untuk menganjurkan Pesta Padi Antarabangsa Pulau Pinang dari 11 hingga 12 Ogos di Kampung Terus. Begitu juga tahniah kepada Honourable Telok Ayer Tawar yang akan menganjurkan Pertandingan Memancing Taman Robina pada 12 Ogos juga. Dan juga Seberang Perai International Conference On Ecotourism and Conservation Efforts tahun 2018 yang akan diadakan di The Light Hotel dari 8 hingga 9 Oktober ini, dan di mana saya akan menjemput semua Honourable Members daripada Seberang Perai untuk menghadiri conference tersebut. Program Mah Yoke Seng Open Traditional Lion Dance Competition juga akan diadakan pada 18 Ogos tahun ini di Juru Auto-City, dan Pesta Tanglung Seberang Perai tahun 2018 yang akan diadakan pada 16 haribulan September 2018 di Bukit Mertajam juga. Sebelum Dewan ini, pejabat saya juga menganjurkan Majlis Jamuan Raya Aidilfitri dan program Syawal Seni bersama MPSP dan Think City pada 30 hb Jun tahun ini di Butterworth Artwork, di mana turut dihadiri oleh Honourable Bagan Dalam juga.

H'ng Mooi LyeDAP · PHJawiEN

Minta laluan. Soalan. Saya nak berkenaan dengan, tertarik dengan pesta tanglung. Sebabkan sebelum ini memang dekat peringkat Seberang Perai Selatan, kita ada menganjurkan Pesta Tanglung Peringkat Negeri bagi Daerah Seberang Perai Selatan yang diketuai oleh bekas ADUN Jawi. Di sini saya nak minta, saya nak tanya tentang soalan berkenaan dengan adakah peruntukan untuk setiap daerah bagi menganjurkan pesta tanglung peringkat daerah. Peringkat negeri untuk setiap dearah, disebabkan sebelum ini memang ada untuk peringkat SPS, saya tidak pasti berapa. Tapi memang ada peruntukan daripada Ketua Menteri dan juga daripada EXCO Pelancongan. So, saya minta kalau ada, boleh teruskan dan boleh bagi satu bajet untuk tahun depan, kemungkinan tahun ini kita sudah tidak sempat, dan kalau boleh tahun depan kita boleh teruskan. Terima kasih.

Yeoh Soon HinDAP · PHPaya TerubongEN

Cadangan Jawi, saya akan ambil maklum dan akan mengkaji untuk untuk macam mana diteruskan, jangan bimbang. Sebelum ini pihak MPSP juga telah menerbitkan risalah-risalah pelancongan Seberang Perai seperti Seberang Perai Tourist Map, Seberang Perai Heritage Map, Seberang Perai Street Food, Birdwatching di Pulau Pinang dan Penang Homestay. Risalah-risalah ini diedarkan di kawasan tumpuan pelancongan seperti hotel, lapangan terbang, pusat membeli-belah dan tempat-tempat tarikan pelancong. Risalah ini juga digunakan dalam pameran pelancongan antarabangsa bagi mempromosikan Pulau Pinang termasuk Seberang Perai kepada pelbagai lapisan pelancong. Yang di-Pertua Dewan, walaupun saya hanya mengambil alih pejabat EXCO Pelancongan baru, tidak cukup tiga (3) bulan, saya boleh memberi komitmen saya bahawa rancangan pembangunan pelancongan saya akan merangkumi kawasan ketiga-tiga daerah di Seberang Perai. Cadangan-cadangan yang dibangkitkan oleh ADUN-ADUN kawasan Telok Ayer Tawar, Bagan Dalam, Penanti, Sungai Acheh, Jawi dan Bukit Tambun semua akan diambil maklum dan tindakan susulan akan diambil. Saya merupakan seorang EXCO yang berfikiran terbuka, open minded… (with permission), saya bersedia menerima apa-apa pandangan dan cadangan daripada semua sahabat-sahabat ADUN, dan untuk kita sama-sama membangunkan industri pelancongan, khususnya Eko Pelancongan di kawasan Seberang Perai. Mr Speaker, Kerajaan Negeri akan terus memberi fokus juga kepada usaha untuk meningkatkan bilangan laluan penerbangan terus ke Pulau Pinang dan juga kekerapan penerbangan. Bagi meningkatkan daya saing Pulau Pinang sebagai destinasi pelancongan utama, Kerajaan Negeri telah berusaha dan bekerjasama dengan syarikat-syarikat penerbangan untuk membawa lebih banyak penerbangan terus ke Pulau Pinang. Bagi tahun 2018, Kerajaan Negeri telah berjaya mendapatkan beberapa laluan penerbangan terus seperti: (a). Doha melalui penerbangan Qatar Airways mulai 6 Februari 2018 dengan kekerapan 3 kali seminggu; (b). Banda Acheh melalui penerbangan Malindo Airline mulai 15 Mac 2018 dengan kekerapan 3 kali seminggu; (c). Jakarta melalui penerbangan Citilink mulai 25 Mac tahun ini dengan kekerapan 7 kali seminggu;

(d). Hanoi melalui penerbangan Air Asia mulai 1 Julai tahun ini dengan kekerapan 4 kali seminggu; dan (e). Phuket melalui penerbangan Air Asia mulai 1 Julai tahun ini dengan kekerapan 7 kali seminggu. Manakala beberapa penerbangan terus yang lain juga telah dipertingkatkan kekerapannya seperti berikut: (a). Hong Kong melalui penerbangan Cathay Dragon juga telah ditingkatkan kekerapan dari 10 kali kepada 12 kali penerbangan seminggu; (b). Bangkok melalui penerbangan Thai Airways telah ditingkatkan kekerapannya dari 10 kali kepada 14 kali penerbangan seminggu mulai 23 haribulan Mac; (c). Doha juga ditingkatkan kekerapan daripada asalnya 3 kali seminggu kepada 4 kali seminggu mulai 1 haribulan Julai; (d). Guangzhou juga telah ditingkatkan kekerapannya melalui China Southern Airline ke 14 kali, dahulu ia 7 kali, sekarang 14 kali mulai 1 Jun tahun ini juga. Lapangan Terbang Antarabangsa Pulau Pinang mempunyai kapasiti sebanyak 6.5 juta penumpang, dan pada tahun 2016, angka ini telah dicapai dengan jumlah pergerakan penumpang sebanyak 6.7 juta, iaitu telah melebihi kapasitinya. Bagi tahun lepas, tahun 2017, jumlah pergerakan penumpang adalah 7.2 juta, iaitu peningkatan sebanyak 8.2% berbanding dengan tahun sebelumnya. Pada tahun ini, tahun 2018, jumlah pergerakan penumpang adalah dijangka akan mencapai 7.8 juta. Dengan kemasukan pelancong yang meningkat dengan begitu ketara setiap tahun, terdapat keperluan yang kritikal untuk menaiktaraf Lapangan Terbang Antarabangsa Pulau Pinang. Kerajaan Negeri mengalu-alukan pengumuman Menteri Kewangan bahawa Kerajaan Persekutuan akan membesarkan Lapangan Terbang Antarabangsa Pulau Pinang di samping mewujudkan sebuah Low Cost Terminal dengan kerjasama Air Asia. Seperti mana yang telah dimaklumkan kepada Honourable Bagan Dalam juga, dalam sesi perbahasan, laluan penerbangan terus dari Chennai, India ke Pulau Pinang mempunyai satu potensi untuk menarik lebih ramai pelancong ke Pulau Pinang. Kerajaan Negeri telah menganjurkan Familiarization Trip untuk media dan wartawan dari negara India pada 9 hingga 12 Oktober tahun lepas di Pulau Pinang. Pada tahun ini, di Januari, Kerajaan Negeri juga melalui Penang Convention & Exhibition Bureau (PCEB) telah menjalankan kempen promosi di India dan mendapati bahawa terdapat sambutan yang menggalakkan, terutamanya dalam bidang Business Event dan Wedding Tourism. PCEB juga telah mengadakan perbincangan dengan syarikat penerbangan bagi mewujudkan laluan ini. Kerajaan Negeri akan terus menyusuli perkara ini bagi merealisasikan laluan penerbangan terus dari Chennai ke Pulau Pinang. Dan saya akan menjemput Honourable Bagan Dalam, sama-sama kita menerokai pemasaran pelancong di negara India. Yang di-Pertua, selama ini negeri Pulau Pinang memang mempunyai hubungan yang rapat dengan banyak...(interruption).

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Yang di-Pertua.

Deputy Speaker of the House

Chennai, India.

Ong Ah TeongDAP · PHBatu LancangEN

Untuk lapangan terbang. Okey. Sebab saya ingat EXCO teruskan, so saya tak nak ganggu. So, benarkan, izinkan saya Honourable Paya Terubong. Saya memang tertarik dengan penerbangan baru yang akan ada di Pulau Pinang ini. Yang penting sekali saya bangkitkan dalam isu perbahasan saya adalah berkenaan dengan lapangan terbang sekarang, tu berbumbung seperti yang tidak berbumbung. Masalah sekarang adalah masalah bas persiaran kita, yang datang, tourist-tourist yang masuk ke Pulau Pinang menghadapi masalah musim hujan seperti sekarang. Arrival...(with permission), Dato' Yang di-Pertua, arrival ataupun departure akan mengalami hujan, kalau musim hujan akan basah, basah kuyup. Sampai ke Pulau Pinang ataupun nak balik, nak naik ke atas kapal terbang. Disebabkan lorong pertama telah ditutup dengan bollard, tidak dapat masuk, so sekarang kereta-kereta semua akan sampai keluar third lane. So, kereta-kereta itu akan mengambil tempat-tempat bas persiaran. So bas persiaran akan berhenti di luar sekali. So masalah-masalah ini telah berlaku di Pulau Pinang, saya mengharapkan Honourable EXCO dapat membuat sesuatu, iaitu imej Pulau Pinang untuk tourist yang datang dari overseas. Sekian, terima kasih.

Yeoh Soon HinDAP · PHPaya TerubongEN

Terima kasih kepada Batu Lancang. Memang saya juga akur terhadap pandangan daripada Batu Lancang bahawa memang terdapat masalah dan isu di lapangan terbang pada masa kini. Pejabat saya

telah melalui Penang Global Tourism (PGT) juga akan menghubungi pihak lapangan terbang untuk berbincang masalah-masalah yang telah dibangkitkan tadi.

Ong Ah TeongDAP · PHBatu LancangEN

Ada lagi isu, Yang Di-pertua. Isu yang saya bangkitkan berkenaan dengan tandas semalam, pasal itu. Isu tandas memang teruk, sebab semasa saya pernah menjadi Ahli Majlis, kita pernah buat lawatan di tempat itu. Isu tandas sampai hari ini pun juga saya terima aduan. Memang teruk. Itu juga imej Pulau Pinang.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you to Batu Lancang. Indeed, the problem of dirty public toilets has become an issue, as mentioned by KOMTAR in his debate on the toilets on the ferry. For these toilets, I hope the MBPP (Penang Island City Council) and also the Local Council can cooperate to enable a task force to control the cleanliness of public toilets everywhere, including tourist attractions. Mr Speaker, all this time the State of Penang has indeed had many close ties with cities internationally or with other states, including establishing Sister City… (with permission) relations with Adelaide since 1973, with Medan since 1984 and with Siamese since 1993. Apart from Sister City… (with permission) relations, cities with the status of Friendship City… (with permission) with Penang include Farmington in Austria since 1978. This may be a fact that few people know. We all know that Penang has a Sister City relationship with Adelaide, but many do not know that the MPSP (Seberang Perai Municipal Council) also has a Friendship City relationship with Farmington in Austria. Also, Taipei since 2011, with the city of Kaohsiung since 2011 too, with Bangkok also since 2012, with Chongsan, Chongsan in Kuanthong since 2012, with Hainan since November 2012 too, and also friendship city relations with Changwon in Korea in 2012 and Yogyakarta since 2012, and Phuket likewise in 2012. But I find that although we have so many friendship city or sister city relations with these cities, there is a problem, namely a lack of consistent interaction with these cities. It seems that no follow-up action is taken, or no linkages are made, with these cities after agreements are signed or relations are established. This is like a woman and a man who get married or engaged, but then do not live together, or separate just like that, with only paper and no relationship. So I… (interruption).

Teh Lai HengDAP · PHKomtarEN

Pardon me, is the EXCO of the view this way because the government does not have a special department or a special team to carry on this kind of work? So, as the EXCO said, after just signing, there is no cooperation between one another at all. I here propose that the government may establish a special department to manage these works and responsibilities.

Yeoh Soon HinDAP · PHPaya TerubongEN

Thank you, KOMTAR. To answer this question, there is indeed an idea from me for the time being to establish a sister cities and friendship cities coordinating committee. This committee will promote and create close ties between Penang and the existing friendship cities, and will also build new relations with cities or states with potential that can bring benefit or goodness to the State of Penang. A long-term plan will be drawn up to establish communication mechanisms and encourage exchange and cooperation between Penang and various cities in various aspects, including tourism promotion and cultural exchange with those cities. This committee will also strengthen Penang as a primary destination of choice for investors and tourists. Besides that, this committee will also play a role in encouraging direct flights between Penang and those friendship cities.

Mr Speaker, Business Events tourism, or what is known as Meetings, Incentives, Conventions and Exhibitions (MICE). Business Events or MICE based tourism is one of the trending segments of the tourism industry in this world and is also a major tourism industry in the State of Penang. Through a study conducted by the Penang Convention and Exhibition Bureau (PCEB), for the year 2017, Penang hosted 2,511 programmes involving the participation of 267,518 participants and the use of 457,866 room nights. These figures contributed to the estimated economic impact of Business Events-based tourism. Among the major programmes held in

2017 were the following: the Penang Medical Expo and Malaysian Healthcare Policy 2017 at Setia SPICE, and the George Town Literary Festival 2017, which will also be held in November this year for the George Town Literary Festival 2018. Business Events Penang 2017 was held on 7 to 8 December last year, also at Setia SPICE.

For future planning, the State Government will continue efforts to attract more international programmes to be implemented in Penang. For 2018, the State Government has succeeded in bidding for international programmes to be held in the State of Penang, such as the Inter-Islands Tourism Policy Forum (ITOP Forum), which is based on island tourism, and the Asia Pacific Masters Games in the field of international sports. For 2019, a World Class Seafood Congress will also be held in Penang. The State Government has the aspiration to position Penang as a domestic and also primary choice destination for world class conferences and conventions.

Mr Speaker, under the efforts of the State Government, Penang is to become one of the very popular tourist destinations, with the rate of tourist arrivals increasing every year. In 2017, Penang received recognition from several international organisations, such as Penang being listed among the 17 best places in the world as a destination to be visited in 2017 by CNN. Gurney Drive was known as one of the 25 Best Streets Around the World for Tourists to Visit Before You Die. Malaysia as Penang as the 4th Place With The Best Healthcare In The World 2017 by International Living. Time.Com also named Penang as one of the 10 Amazing Asian Vacations That Won't Cost a Fortune, and Penang was also listed in the Lonely Planet book entitled Street Art, and Line Clear Nasi Kandar and Siam Road Char Koay Teow were recognised as The Best Food In The World.

This recognition shows that the State Government is on the right track in tourism development. The State Government will continue its efforts in showing the tourism development of Penang. The State Government will… (interruption).

Lee Chun KitDAP · PHPulau TikusEN

May I interject, Mr Speaker. Thank you, Honourable Member for Paya Terubong. I would like to ask for a small clarification. Just now you informed us of several places that are very popular as tourist destinations in the State of Penang. I would like to ask whether traffic conditions in Penang affect our potential to attract more tourists to our state, because sometimes at places such as Pulau Tikus, at Lorong Burma, and several times a year at the Sleeping Buddha Temple area, the traffic situation is indeed rather unsatisfactory. So, I would like to ask the Honourable EXCO whether the traffic situation in Penang affects our potential to develop our tourism potential. Thank you.

Yeoh Soon HinDAP · PHPaya TerubongEN

It is undeniable that the arrival of tourists will make our traffic congested. Each time there is any festival or celebration, the MBPP must certainly have a traffic management plan to control the traffic area, and indeed traffic in Penang has become an issue. Therefore, we need a transformation plan to solve traffic as a whole.

Mr Speaker, the State Government will encourage and further enhance tourist attraction products of international standard, such as the development of The Top at KOMTAR with attractions such as the Rainbow Skywalk and The Gravityz project, and also The Habitat project at Bukit Bendera with the Canopy Walk and Tree Top Walk, and the Entopia project. The State Government also plans to create Glamping activities that enable tourists to enjoy the experience of nature with modern and comfortable accommodation. Glamping will be placed around the Teluk Bahang forest known as Boulder Valley without damaging the environment and ecological system.

In response to the requests of the Honourable Member for Bukit Tengah, the Honourable Member for Pengkalan Kota and the Honourable Member for Batu Lancang to bring the sailing vessel Equanimity to Penang as a new attraction, this proposal will be studied and will also be submitted to the Minister of Finance for consideration. Likewise, regarding the ferry issue, I also accept the proposal of the ADUN KOMTAR to transform the old Penang ferry into a tourism product. This ferry is indeed also a heritage for the people of Penang that we cannot forget and must be preserved. Penang has beautiful sea waters, and we should use these marine water resources as a natural resource to be incorporated… (with permission) with the ferry to bring tourists, like the ferry product in Hong Kong that can bring tourists to sail around Victoria Harbour. This proposal will be studied and taken into discussion with Prasarana, which is the company that manages the ferry, Rapid Ferry. But before any transformation of this ferry to become a tourism product as I mentioned just now, I also hope the ferry management can

improve the cleanliness standard of the ferry toilets, so that they do not become like this, showing pictures of disgusting toilets (with permission), which indeed give a negative image to tourists.

Honourable Member, Mr Speaker, I would like to emphasise once again that the State Government will establish a State Tourism Master Plan of Penang (Penang Transformation Plan) that outlines the direction… (interruption).

Speaker (Speaker)EN

Penang Tourism Master Plan.

Yeoh Soon HinDAP · PHPaya TerubongEN

Penang Tourism Master Plan (laughter) that outlines the direction, yes, the same thing, which outlines the direction and development plan for tourism in Penang and which will also identify new tourism areas or products. The idea of this master plan is to summarise the tourism mission of the State of Penang and to draft plans for a short term of five (5) years and a long-term plan of 10 years. As for the commitment I can give for this State of Penang Tourism Development Master Plan, this Penang Tourism Master Plan will draft more comprehensive tourism marketing efforts, which will not only focus on the UNESCO George Town heritage site but will also include the areas of Balik Pulau and also Seberang Perai. Given that the tourism sector is a very important industry and economic resource for the State Government, cooperation from the Federal Government is also welcomed, and it is hoped that together we can advance the state's tourism sector. I hope this vision can be supported by the Deputy and also the Ministry at the Federal level. With that, thank you. I beg to support.

Speaker (Speaker)EN

Thank you, Paya Terubong. I would like to invite the Honourable Members and, thereafter, for the debate session, Datok Keramat for the winding-up.

Jagdeep Sing Deo A/L Kapal SinghDAP · PHDatok KeramatEN

Thank you, I would like to extend my thanks to the Honourable Dato' Speaker, to the Chief Minister of Penang, the Deputy Chief Ministers, all the Members of the State Executive Council, the Members of the State Legislative Assembly, the Heads of Departments, and all the gentlemen and ladies present.

I would like to touch on the issues raised during the debate the other day that relate to my portfolios, namely Town and Country Planning, Housing, and also the new Local Government. I will first, with the permission of Dato' Speaker, touch on the issues raised under the Town and Country Planning portfolio by the State Assemblymen, in which they asked about the issue of non-Muslim places of worship. For the information of Dato' Speaker, the State Government, through the JPBD, or now known as Plan Malaysia in Penang, has completed a Correlation Report on RIBI for the North East District. Meanwhile, for the other districts, the reports will be prepared promptly using the basic inventory data prepared in-house by Plan Malaysia in Penang. This RIBI Correlation Report is very important, Honourable Dato' Speaker, because it is an official document containing detailed data and inventory on the distribution of RIBI site locations, and it will facilitate the relevant authorities, especially the local authorities, in considering any application for RIBI sites, taking into account the suitability of the location and its sensitivity. Also, several parties have raised the issue of the status or level of gazettement of all local plans, including the state structure plan, local plans, and also the RKK. For the information of the Honourable Dato' Speaker, for the RKK, two have already been gazetted, namely Bukit Bendera and also the UNESCO George Town World Heritage, and I was also gazetted in September 2017, and for Botani it will be gazetted shortly, given that several amendments have been made; otherwise it would have also been gazetted but due to the amendment…(with permission). And for the further information of Honourable Dato' Speaker, for Bukit Bendera too, which has been gazetted. A study is currently being carried out, where although the RKK Bukit Bendera was gazetted in 2017 as I stated, there is a Bukit Bendera Local Plan of 1996 that has not been revoked. So, there are two documents for Bukit Bendera that we want to harmonise into one, so a study is taking place as I speak here…(with permission) to harmonise these two documents, and it is hoped that this can be resolved shortly. Honourable Dato' Speaker, regarding the issue under the Local Government portfolio, I would like to touch on it briefly, as several State Assemblymen have raised it. For the information of Honourable Dato' Speaker, my colleague from Sungai Dua raised the issue relating to the provision of a suitable area for street hawkers in the Sungai Dua state constituency. I think…(with permission) this is a very important issue and I thank Sungai Dua. But it is not specific to Sungai Dua alone; it is for the whole state.

And indeed, as I stated the other day, enforcement action must be taken where they are found to be illegal, and I have stated that this must be firm, especially in areas involving security problems and so on. However, I agree that we do need to provide a location for these hawkers to be relocated to, if possible. As for the Sungai Dua State Constituency, there are two (2) food complexes, namely the Desa Murni Food Complex and the Sungai Dua Public Market, which are under the supervision of the PBT. Apart from that, Honourable Dato' Speaker, MPSP has also provided a hawker site, namely the Sri Murni Hawker Site, for the purpose of relocating hawkers from the roadside. Also this morning, there was a question, actually…(with permission) to my colleague in Batu Maung, which I heard this morning, regarding hawkers on the main road, namely along the Penang General Hospital. In fact, that was a project under me as the State Assemblyman for Datok Keramat, this is my constituency. In the first term too, which had that purpose and objective, namely to legalise the hawkers and place them, all of them, properly, and before that there was nothing, but we upgraded the whole road and made it not just a good hawker site. But if you recall, that area was originally a two-way road, but we made it a one-way road so that the security issue could also be managed. The Sungai Dua Honourable Member also raised the issue of encroachment on hill areas for development and agriculture purposes. For the information of the Honourable Member, the State Government will always carry out monitoring work on hill encroachment activities from time to time. Among the steps taken by the State Government in addressing the issue of hill encroachment are the following: (a). Increasing the manpower involved in monitoring land works, especially in hilly areas. (b). Monitoring on weekends and public holidays. (c). Coordinating enforcement action with all relevant agencies such as the Local Authorities, the District and Land Office, the Department of Survey and Mapping, the State Forestry Department, and non-governmental bodies or NGOs. (d). Honourable Dato' Speaker, increasing monitoring using drones in hilly areas. (e). Installation of CCTV at 22 locations to enhance direct monitoring. (f). Issuing stop-work orders under Section 70A, Akta Jalan Parit dan Bangunan 1974 for all illegal hill-levelling works, which are first referred to the Legal Advisor's Office for court action. (g). Removing machinery, plant, vehicles and others to ensure land works are halted. (h). Regular motorcycle monitoring and patrols by the Land Office in hotspot areas to personally observe activities in those areas. And if there is encroachment involving state land, a notice of encroachment will be issued immediately to the party concerned and will be followed by enforcement action if it is not complied with, and ultimately prosecution by both Local Authorities in court. Honourable Dato' Speaker, the Honourable KOMTAR has raised the issue regarding the problem of crows in the George Town area. To answer this, various methods have been used by MBPP in an effort to reduce the number of crows on the island, especially in the George Town City area. For the information of the Honourable Member, among the methods used to overcome this problem are shooting, trapping, removing nests, setting traps and poisoning. MBPP will take this action in major areas such as playgrounds, residential areas, commercial areas and industrial areas. For the information of the Honourable Member too, MBPP, in an effort to trim the branches of trees that are dense around the George Town City area, aims to reduce the space for crows to perch and roost in those areas. For the information of the KOMTAR Member, the number of crows that have been eliminated for the period from January to July this year alone is 6,904, and this includes eggs and crow chicks. For the information of Honourable Dato' Speaker, the Machang Bubuk Member has raised the issue of the involvement of the State Assemblymen during the preparation of the annual budget, for both PBTs, MBPP and MPSP. For the information, I understand that both MBPP and MPSP will hold an annual budget dialogue session during the budget preparation, which will be attended by the YB, the State Assemblymen, Council Members, Heads of Departments, associations and residents from various levels, and the preparation of this budget always takes into account the views and suggestions put forward during the dialogue session in order to ensure that the annual budget is balanced and fair.

The Pengkalan Kota Member has raised the issue relating to the upgrading of the Cecil Street or Lebuh Cecil Public Market. For the information, Honourable Dato' Speaker, in 2013 MBPP carried out upgrading works on the public market, involving a cost of RM900,041.19, where among the upgrading works carried out were wiring works, upgrading of trading space, repair of roofing and others. However, if there is a need to re-upgrade the said damage, MBPP will take prompt action to repair the damage. In fact…(with permission), under this portfolio, the former EXCO, namely the Most Honourable Chief Minister, has already launched a programme to upgrade all markets in the State of Penang, and that is the objective and purpose for which we will continue this effort. In fact, recently one market, namely the market at Paya Terubung, we have recently gone to, what is it, open, because it was an abandoned market that has been completed and can now be used, Honourable Dato' Speaker. The Penanti Member is not here but raised the issue of cleaning and waste management in the Sungai Lembu area. In answer to him, the house-to-house rubbish collection service is carried out three (3) times a week, while communal bin rubbish collection is carried out every day in the MPSP area including Sungai Lembu, and general cleaning of state roads registered with MARRIS is carried out by contractors appointed by MPSP, where the final date of cleaning in the Sungai Lembu area was carried out on 28 July 2018 and was completed recently on 2 August 2018. Now, Honourable Dato' Speaker would also like to move directly to my portfolio, namely housing, where I have a lot to say, but I hope I will not repeat myself, because in the winding-up, I mean in the oral session, I have answered a lot, but I think it is very important, as Honourable Dato' Speaker knows from the previous term too, I take the opportunity at every State Assembly sitting to provide the latest information even though it may be the same issue, but it is very important to give the latest information regarding the efforts of the State Government to give priority to the provision of affordable housing, including low-cost housing in the State of Penang. In this regard, I am pleased to inform you that from 2008 until now, the latest number, Honourable Dato' Speaker, 2018 now, current, for affordable housing A, B and now C too, previously I only mentioned A and B because that is the low-medium cost, whose number is around 25 thousand being built. But now there is C too in the market, because our efforts to build more affordable housing up to 300,000 on the Island side and 250,000 on the Mainland side have been seen to be realised; last time it was in my planning, but we have been able to physically complete construction, and for the information of Honourable Dato' Speaker, I understand that we now have 28,915 affordable housing units of A, B and C that have been completed, and in the process, what I mean is in the process of being built, is 22,000, 22,065, and what has been planned or approved for construction is 32,212 units. And this leads to a large figure, Honourable Dato' Speaker, namely that in Penang since 2008 until now there have been many allegations that we have not built low-cost and low-medium cost affordable housing, and I want to say that this is not true at all. I have shown that 28,000 have been built, 22,000 are being built, and 32,000 have been approved for construction. The overall total is 82,472 for the people of the State of Penang, which we will, which we will build, and in fact there was a question from my colleague from Sungai Pinang, who asked about our performance compared with what was stated in the manifesto. For your information, in the manifesto for affordable housing in Penang, what was promised was that 75,362 would be built, would be, would be built. But just now I showed that we have not only fulfilled that promise, but we have exceeded it, there is, we have 82,000 compared with 75,000 previously. Yes.

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Thank you Mr Speaker, thank you Dato Keramat, I greatly appreciate the information conveyed, namely the 28,915 affordable housing units of categories A, B and C that have been completed, including those in progress. Only I would like a little clarification on the breakdown of RMM (Rumah Mampu Milik) here: how many A? How many B? And how many C? For those that have been completed and also those in progress, and furthermore, who is developing these projects? Whether the private sector or the State Government itself. Thank you.

Member for Datok Keramat (YB. Jagdeep Singh Deo A/L Karpal Singh): Indeed, as I stated just now, what has been built is 28,000 and 22,000 are being built, and 30,000 are those that have been approved for construction. I can provide the details, in fact there is a written answer in which details have been given in terms of low cost and low-medium cost, and the different types of RMMC, and I will forward it to you in the details, but the important question, and I think Sungai Dua is asking, is because there is always confusion when the State Government says we have built. Whether the State Government itself builds, or the private sector, or the Centre too. There are central agencies. To answer that, the answer is all of them. The percentage between the private sector and the State Government is nearly 50/50. The written question with its details, we are forwarding to Sungai Dua. But of course, unfortunately, and I always say, for ten years we were step-childed by the previous Federal Government, where for example the PRIMA programme was not built even one in Penang. Dato' Speaker. But hopefully now all that will change with the changes that have taken place. I want to state, as an answer to Sungai Dua also, State Government projects. That means our own project. Now there are 18 projects, Dato' Speaker, that will provide 27,080 units, and for your information Sungai Dua, these are our own projects. For low cost there will be 717, for low-medium cost there will be 9,283..9,283, and for the, that means up to 215,000 on the mainland and on the island 30,000, that is 70,080. So, these are the details that I want to state and from these 18 projects. I am pleased to announce that one project, namely phase one at Bandar Cassia Suria, 520 units, has already been completed and the keys have been handed over to the owners. I have details of all the projects but I do not intend to read them out because they are too long. But I can always forward this to my…(interruption).

Speaker (Speaker)EN

I think it would be good to circulate it to everyone.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

I think, I will do that. I will do that because it is important for all the backbenchers to know exactly what the state has achieved…(with permission). Of course, as I have stated and I do not want to repeat, it is hoped that federal agencies can now also help in the provision of affordable housing. I do not want to touch on the issue raised by Sungai Dua regarding federal agencies that supposedly did not help us, but that day I had given some expression of regret. Now, another matter that I found from the State Assemblyman is regarding the selection process, or how the units, once built, are distributed to applicants who need them. In this regard, for the information of Dato' Speaker, there is a committee, namely the SPEC Committee, which I set up in the previous term, where at that time there were 10 representatives of the people from the EXCO, from the MPs, and from the State Assemblymen who sat on it, and where now, for this term, I report to Dato' that it has increased to 14. So, transparency in selection is very good indeed. There are 14 representatives of the people who will assist me in the process of selecting applicants eligible to be allocated low-cost, low-medium cost and similar houses. And since the beginning until now, we have sat 44 times, where for low cost, 20,051 applicants have been selected, 20,051 for low cost. For low-medium cost (RMMB), 8,638, and for the new RMMC, 14,432. That means SPEC since the start until now has selected 43,121, sorry Dato' Speaker, flu… that is why I spoke early…(interruption).

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Thank you Datok Keramat. Only I also want to know in terms of the balance, the balance of PN1 registrations, which I think is many tens of thousands more. How many more balances are there that we will resolve, and perhaps there are additions too, and one more thing for transparency in terms of selection. Okay, there are 14 members.

14 wakil rakyat in the community.

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

If possible, we ask that the Opposition also be included to ensure that transparency.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

I fully agree with Sungai Dua, so I ask Sungai Dua to choose which of the three (3) who wish to come into this committee. There is no problem at all, and so, that one I agree to and give my commitment. Maybe you can decide among yourselves. And for the earlier question from Sungai Dua regarding the remaining applicants. For the information of Dato' Speaker, when SPEC began sitting in 2014, no, 2013. I want to state to Dato' Speaker that at that time, on the waiting list, there were people in their 70s registered on the waiting list. That shocked me. I had only just been born, and people were still waiting when I became chairman of SPEC. Unreasonable. But anyway, we have cleared that list with a great deal, and I want to state to Dato' Speaker that the latest now, after the update, is around 2,000 on average. There are districts. I want to report to Dato' Speaker. There are a few districts because our selection is based on race under the state structure plan. We have to allocate according to race, that is Bumiputera, that is Chinese, that is Indian, according to a certain percentage for low cost and low-medium cost housing. There are some districts where I can give an example. I think. If I am not mistaken, my members are not here, like SPS. Dato' Speaker, for the Indian race, we are up to date. That means sometimes we have projects where we don't have names. They have to come back later. We are talking about low cost and low-medium cost and affordable housing, you can understand, a lot of stock, but that we have, that has reached our level, Dato' Speaker. Compared with when we first started. But I will get the exact number, and I also have one written question. I will forward it to Sungai Dua. I am also interested in several ADUNs who have applied for, I think Bagan Dalam, I think Pengkalan Kota, a few others to talk about ensuring young people get houses, 30% and so on. I think that is a good proposal. We will do so, but as I said, the main problem especially for young people. Since they have only just entered the economy. They are just entering the market, having completed their studies, so it is difficult or hard to obtain a bank loan. That is the main obstacle I see for applicants who are young people, and it is not only for young people but across the board for first-time home buyers. So, we need to address this core issue. If we do not address this core issue, this problem will certainly continue. Please.

Satess A/L MuniandyDAP · PHBagan DalamEN

Thank you, Honourable Member Datok Keramat, Dato' Speaker. The State Government, according to what the Honourable Member Datok Keramat told us the other day, that now the Federal Government is studying how to relax the conditions of bank loans by financial institutions. We welcome that, and what I proposed in my debate speech is a housing scheme, the rent-to-own housing scheme that we will have. I ask that 30% be set aside for young people, especially those aged 35 and below. That is my proposal. I hope Datok Keramat can consider my request and, if possible, implement it. That is my proposal. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Okay, for rent-to-own, we will take it into account. What was stated, 30% set aside for those 35 and below. Of course, subject to them having to comply with all other criteria. Some we will allow young people to fit into the categories of low cost, medium cost, even rent-to-own. So, they have to comply with the eligibility requirements before they can get it... there are many criteria they must comply with. But I take note of what Bagan Dalam said, and although I am no longer young, my hair is already white, I totally follow where you are coming from, and we will look into your proposal. I think you are a member of SPEC, otherwise I might call you so that there will be more young people in the SPEC committee too. So, Dato' Speaker. Regarding the rent-to-own project, since you are on the subject now... I think it is very important. If we look at the trend, or in the previous term. This programme did not receive very good attention, where only two (2) pilot projects, namely Seruling Emas and Sungai Duri Permai, were launched and received a good response, but after that I see it moved slowly. But in this new term, I think under the recommendation of the YAB Chief Minister himself. He is of the view that this needs to be increased further, and as I wanted to say just now. There is one project, a centre that I had asked to be changed to this rent-to-own method, namely Permatang Tok Subuh, which will bring 231 units, and also another project in Mak Mandin that will bring 70 units, which I hope the KPKT will agree to, so that they can be distributed through the rent-to-own concept, and for this proposal also... (interruption).

Lee Khai LoonPKR · PHMachang BubukEN

Request for explanation. Honourable Datok Keramat. I have just one question about this rent-to-own concept. Because the supply of PPR housing is very limited. If we give the rent-to-own concept, the PPR houses will become private ownership. It will directly reduce the supply of PPR houses. Is there a better approach, namely through rental, so that we can ensure the supply of PPR is given only to those who really need PPR housing.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank you, Machang Bubuk, for that question. Indeed, our plan to expand the rent-to-own scheme does not mean we will completely stop the supply of PPR. We want to try to balance it out. That means I give you an example. We have one rental scheme at Desa Wawasan. I think everybody knows Desa Wawasan. Is that a BM area? And in this scheme, let me give an example of what is happening. Because it is full rental, purely rental. There is no rent-to-own at any time, so we become owners, which is the rent-to-own concept. I found many arrears. Number one, because they do not have a sense of ownership. They don't have a sense of ownership. And then, because they have no sense of ownership either, they tend to leave the premises and do not maintain them properly. And it becomes almost a slump, and the State Government has to go and maintain it, spending a lot of money. So, for the Desa Wawasan programme there is one proposal, Dato' Speaker, because there are two (2) blocks. And both blocks, the take-up rate is around 50 to 60%. We have one proposal that we are now studying, we want to move everyone to one block. And that will be used as rental only. And the other block, when it is completed, we will rectify whatever problems it has, and we will do it under rent-to-own.

So, this is an example where there will be one scheme with two types. So, for the good tenants, the good paymasters from among those existing now, we will give priority to them to move under the rent-to-own method. So, this is an example, one example I gave to answer Machang Bubuk, who raised a good proposal. It is not our intention, Dato' Speaker, it's not our intention... (with permission) to stop PPR. PPR will still be there. In fact, for your information, what I mentioned the other day, we went to the Ministry to meet with the Honourable Minister to reconsider Kota Giam in Jelutong. The two (2) plots that we have identified are for PPR, not for rent-to-own. So, we will have enough PPR, and we will also have enough rent-to-own.

Lee Khai LoonPKR · PHMachang BubukEN

Honourable Datok Keramat.

Yes.

Lee Khai LoonPKR · PHMachang BubukEN

I think the explanation is fine, I can agree that for Desa Wawasan it is a condominium-type apartment. But for the houses in Permatang Tok Subuh, it is somewhat different because they are single-unit houses, which are landed, and which are also not multi-storey, and the floor area is 1,300 square feet per unit, and there is indeed a lot of demand to buy these houses. But I think we cannot compare that with Flat Wawasan, because the houses in the Permatang Tok Subuh area really look very good. Many, there is a lot of demand. If we give them on a rent-to-own basis, they will be owned by those people forever, or they will sell it to other people if they get a higher income in the future.

Therefore, if the house can be made like a government quarters, or PPR housing, which could perhaps be a good example only for people with an income like those in Padang Tembak, if they have reached a high socio-economic level, then they must move out of the PPR housing. It can be considered because the two areas are not the same, the house type.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

For Tok Subuh, I agree with Machang Bubuk. It's not low cost. It cannot be compared with Seruling Emas and Sungai Duri Permai. In fact, we are in the process of considering how, if we can distribute it through the rent-to-own scheme, if the Federal Government agrees, what price we will set. It's not one-size-fits-all, every scheme has a different price. If you look at Sungai Duri Emas and Seruling Emas and Sungai Duri Permai as well, the pricing is actually different. Their payments, the period, is also different. So, we already know that this is going to happen here, the demand is very high in Tok Subuh because it is landed, it is very big. For sure, we will not set the eligibility limits, what are these eligibility requirements, it is not low cost. Most likely, Dato' Speaker, it will be low-medium cost, or even affordable, because it's not you, it cannot be compared. I agree with you on Desa Wawasan. That is one.

Number two, the point raised by Machang Bubuk on this issue is that if we give it to applicants to own, then it cannot be rolled over to other applicants. Of course that is going to happen. But as I said, a sense of ownership is very important so that maintenance is there. Number two, if we impose low-medium cost conditions, for example, if for this project, we will also impose a moratorium on resale. So, it cannot be a speculated piece of property. That means they will be subject to the same condition as now for LC, LMC, 10 years, they cannot sell from the principal purchase. I certainly agree with that.

Regarding stock, if we use the rent-to-own method, we will lose stock, because it will become the property of the tenant at some point in time. I want to state, that's why I say in this term we want to look at how we can increase more schemes. So, it will not stop at Kampung Tok Subuh only. We will certainly look at many other schemes to be introduced that can be distributed through this rent-to-own scheme, Dato' Speaker.

Dato' Speaker, let me continue. I think, Bagan Dalam, I already spoke about how many, how many remaining applicants there are for PPR, where the other day I stated 1,500, and of course, we need to find more units for those who are waiting, especially Dato' Speaker, in the North-East district. Of the 1,500, nearly 900 are in DTL. That's why we need the Kota Giam project ASAP, and I hope in this term we can see that happen.

Dato' Speaker, let me continue with the maintenance issue. For the information of Dato' Speaker, we have 50 Public Housing Schemes under the Housing Department. We have about 50 Housing Schemes, Public Housing Schemes, and since 2008 until now, Dato' Speaker, we have spent a total of RM160,754,000 on 50 schemes since 2008. And of course we will continue to try to maintain them, and we hope that, apart from the efforts of the State Government now, since the Federal Government has been taken over, the central maintenance programmes can also help the State Government in the maintenance process, because the cost is tremendously high, like I said, RM160,000,00 in the last 10 years, and we can foresee this will continue, and we will continue to commit to these public housing schemes.

For private housing, Dato' Speaker, at state level, we have a fund to help eligible private schemes. They also have to reach a certain level of eligibility before being considered. But, for the information of this House, since it was established in 2013, namely the Maximum 80% Maintenance Fund Scheme, we have implemented 267 projects of various types, namely lift replacement and upgrading, water tanks, water pipes, roofs, paint, road kerbs and so on, 267 in all, at a cost of RM23,300,000. RM23,300,000, this one is for the private sector. So, in all just now, RM160, RM23, we are talking nearly RM180 million, this is a large amount.

Therefore, we need assistance from the Federal Government, where I have applied to the new Minister. He said he will indeed look into considering the remaining outstanding applications under the Tabung Penyelenggaraan Satu Malaysia soon.

I also have several people who discussed what the enforcement status is. But I think, as I mentioned the other day, there are tenants in our housing schemes who want to misuse the units, and we need to be firm and take action. But for those who are truly in difficulty, we will help them later. And we will continue with that process, Dato' Speaker.

Ong Ah TeongDAP · PHBatu Lancang

Yang Berhormat.

Ya. Silakan.

Ong Ah TeongDAP · PHBatu LancangEN

Dato' Yang di-Pertua, I would like to interject. Honourable Dato' Keramat, I am interested in what you said about maintenance. The problem now is RMMA, RMB, which means private. The problem with maintenance is in terms of management. Most of these low-cost houses face management problems. Some do not have any management, and even when the area's Honourable Member has come in to help, it cannot be done, because to apply for the 80:20 allocation there must also be a management body that signs and obtains all the quotations. So, those are the problems we face, for low-cost houses that do not have management. So, I hope there can be a method for RMMA, RMB houses that will come, at least the new ones, on how to control the time and new management... (with permission). Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

I was just about to come to the issue of management of low-cost strata buildings. But of course, that relates to the problem where they do not have a management body. Of course, the easy answer to this issue is that a Management Corporation must be established, which is provided for under the law. It is necessary, but many do not do so, because there are problems over who will be responsible and so on. But, I think our approach, through both Local Authorities, is that we want to provide advisory services to all these housing schemes, so that they take steps to establish a JMB or MC, because there are many benefits they can enjoy if they have a JMB or MC, in terms of management.

But of course, I think what Batu Lancang said, we have to look into, because at the moment this involves state finances. So, the State Financial Officer's Department has its standard operating procedures, where several matters must be complied with before any application under the 80:20 scheme can be considered and approved.

But of course, maybe, if there are particular cases in ADUN areas, I would ask the ADUN himself, because you will know what the specific problems are for specific schemes in your area. Come and see me, and we will see how we can address those problems, so that they can also be considered for allocation and a small amount of funds under this 80:20 Fund. Please.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Honourable Dato' Speaker, I ask for an explanation from the Honourable Member Datok Keramat as well. Perhaps for assistance also under the Maintenance Fund or any relevant scheme, how does the government set the criteria for helping those affected by disasters such as fires or floods. Perhaps there is any scheme that can be linked to Maintenance Assistance.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Thank You, Permatang Berangan. Regarding the fund I mentioned, it is the Maintenance Fund for buildings. But for disaster cases such as fires or floods, it does not fall under this fund. It falls under the State Welfare Department, which has its own procedures to provide some financial assistance to those affected by such disasters.

And of course, for the information of everyone and Mr Speaker himself knows, after the major disasters that struck Penang in September and November last year, the State Government of Penang was extremely concerned. We channelled one-off aid for both episodes to tens of thousands of victims who had been hit by the floods. Compare this with the Federal Government, which gave aid to those we found were not affected at all, and gave only RM250.00 compared with the RM750.00 we gave to each victim.

So, Mr Speaker, I will continue with the issue of responsibility of parcel owners in every housing scheme to pay maintenance charges to ensure the JMB or MC has sufficient funds to manage, coming back to what Batu Lancang said. Just a quick one on the legal aspect: if a JMB or MC is not established, Mr Speaker, or is inactive, action can be taken as I mentioned earlier. The COB can take action under Section 86 of Akta 757, under which they can appoint an agent to manage and maintain such a building. So that is one way out if you have such cases in your area and they cannot achieve 80:20, because of that, maybe you can approach the COB to get a managing agent appointed as soon as possible… (with permission) Mr Speaker, that may be one way out. Yes Jawi.

H’ng Mooi LyeDAP · PHJawiEN

May I have the floor, Mr Speaker. Regarding management bodies for strata-title buildings, in Jawi there are indeed 17 existing schemes of strata-title low-cost housing, low-cost houses. Two of them under the Housing Department, there is indeed no problem under the Housing Department. But for the 15 existing schemes, I think some are more than 20 years old, some are even 30 years old, and at present none of them has a management body. In my speech, in my debate, I proposed that the State Government should set up a task force to look again at these existing schemes that are facing problems, because many schemes have occupancy percentages where some are below 30%, some below 40%. So if we want to ask, although I proposed that the task force would definitely involve the COB, we must also involve the legal adviser, the Legal Adviser, because when residents do not ask the COB, as councillors, former councillors of ours once asked the COB to come down to the ground to help residents set up a management body, but until the end it did not succeed, because too few residents were involved and in some flats the occupancy was below 30%, and most units are empty. It is understood that these units are owned by banks, because people who cannot pay their loans have their units taken back by the banks, but the banks just leave them like this. Most units in my area, in Jawi, have no doors, are empty, and have no windows either. So they have become an illegal rubbish dumping site, and drug addicts often hide in these areas. So I ask the State Government to find a way to solve the problems that have arisen. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

In fact, I have heard Jawi's concern, which was raised because of the many vacant units, not only in his area but across the Seberang and in all parts of the island as well, there are several schemes. For the information of Mr Speaker, I have one, in fact, in the previous term we had several rounds of discussions with commercial banks, where they auction and become owners of units where owners have arrears and cannot pay, and of course there were legal issues that arose. That was the last term, and then we did not move forward because

what was proposed at that time was for us to take over these units, whether the State Government could come in and take over the units in places where there are many vacancies. I think we may be able to review this in this term, because now if this method can be used to enable the State Government to buy these units at a very low cost, we can use these units for a rent-to-own scheme. So, it is one way of us getting more stock. So I agree with Jawi, perhaps a task force should be set up. In fact it has already been set up, but I will revive it. Yes, Jawi.

H’ng Mooi LyeDAP · PHJawiEN

Thank you, Honourable Member. Datuk Keramat, it is not only about existing low-cost housing, but what I am worried about is the future, for the future, because usually these management bodies do not last even three years before they completely collapse. That is why I ask that, if possible, we look again at the new low-cost housing.

Satees A/L MuniandyDAP · PHBagan Dalam

Minta laluan.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Yes, Bagan Dalam.

Satees A/L MuniandyDAP · PHBagan DalamEN

The same issue also applies to strata management. We already have Akta 757, which was enacted in 2013 to overcome this problem. I raise this matter because my area is becoming an area that is already full of strata buildings, there are low-cost ones, LMC and condominiums, and there are already many. What I see is that the commitment from the Commissioner of Buildings, which I need to (with permission) state here, on the Seberang Perai side is less than satisfactory, although there are cases referred that are not taken seriously, that is all. Perhaps before this, because the appointment was made directly by the Federal Government, the Commissioner of Buildings in that area, which I understand, I think perhaps Dato' YDP also agrees with me, I am not sure, we can discuss again. Before this there was indeed progress, but I think for the last one year, indeed since I became a councillor myself, I have experienced this situation where, in Perai, in my area now, we are also facing the same problem, where the Act itself, Section 86, gives power to the Commissioner of Buildings to appoint a management agent in places that cannot set up a JMB or MC, as stated by my colleague from Jawi. Section 19(2) gives power, and Section 86 can be applied, and the COB can appoint management directly. Why is he reluctant to do so? That is my question, Datok Keramat. Thank you.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

Okay, thank you, Bagan Dalam, and Jawi. I just want to wind up. I have just one more point after this, to answer Bagan Dalam. I think before I became the EXCO for Local Government, there were already many of these problems, because as EXCO for Housing, it is connected whether I am in Local Government or before I became the Local Government portfolio holder. At Housing we already have this problem, because when a scheme cannot achieve anything due to problems with the COB, it comes to the EXCO for Housing. So I have indeed seen that there may be shortcomings on the part of the COB, perhaps not only at Seberang but also on the island. But I think Dato' Rozali is also here, Yang di-Pertua, and we can sit down and discuss how we can strengthen the capacity of both COBs to work better in the future. Only one point I want to wind up, to raise in my winding-up as the final point, Mr Speaker, is regarding foreign workers. This morning I answered a question in the oral question session, but I want to announce to Mr Speaker that of the five projects that are ongoing and have been approved, one of them, at Bukit Minyak, will be completed in October, and the CCC is expected to be issued, and it can accommodate this problem, because we see that in Penang there are already many problems in terms of too many foreign workers living in housing schemes, which has an impact on my housing portfolio, where I receive many complaints. But I want to state that in this term, several projects will be completed and it is hoped they can be addressed. For the information of Mr Speaker, just one minute, I said about 20,000 this morning foreign workers, I got the data.

Speaker (Speaker)

More than that?

Data saya dapat menunjukkan actual figure is about 93,000, this is the data I got from Imigresen if I not mistaken 93,000 that mean the illegals are around about the same because industry especially FMM claim that is the amount, itu angka yang perlu kita tacle kalau kita hendak bina apa ini asrama Pekerja asing. Yes Bukit Tengah.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Yes, with permission, thank you, Mr Speaker. First of all, I would like to take the opportunity to congratulate the Yang di-Pertua of the Seberang Perai Municipal Council (MPSP) for the excellence in financial management reported in the recent National Audit Report. Congratulations to MPSP. Regarding the issue of foreign workers, foreign workers are indeed many in Bukit Tengah, placed in residential areas. When I campaigned during the election, I was also shocked to see how many foreign workers were in residential estates. Personally, I support the government's policy to build dormitories for these workers, but I have some questions I need to ask. The first is whether, in housing estates, we have a policy requiring factory operators to register the addresses of their foreign workers. I ask this because it has been done in Singapore. Now, in one estate in Bukit Tengah, residents are facing a problem where nearly 40% of houses are occupied by foreign workers, and they do not know who these people are, they are facing this problem where they do not know who the occupants are, and if there are fights or cleaning and so on. The residents' associations do not know whom to look for to complain to. Recently, in my estate, I held a dialogue with the police, and the police were very cooperative with the Residents' Association. They went around all the houses and collected all the information, from each house, to see where these people work, so they could get in touch with the factory and come up with a way to manage these foreign workers. Especially, yes, I hope to get an explanation on this issue.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

I agree that there needs to be a database at this level, because at this level they are roaming in all housing schemes. That is the problem we are trying to settle, by establishing what, the worker dormitories we are planning, Mr Speaker. And going back to Singapore, for the information of Mr Speaker, in Singapore foreign workers are not allowed to live in public housing schemes. They are not allowed. That is why in Singapore, what, the foreign worker dormitories have reached the fourth generation. I already mentioned it in the previous term too. I went to Singapore and saw that their fourth-generation foreign worker dormitories are more advanced than our condominiums in Penang. If I were in Singapore, I might want to enter and live in one of these foreign worker dormitories. It is really high-tech and their generation form. But in Singapore they do not have that problem, because by law they are not allowed to stay in public housing schemes; they have to stay in worker dormitories. That is the problem there. So I hope, and I want to end here, that with more dormitories like this, we can address this problem. And if necessary, information on the addresses of these workers may be available from FMM, Federation of Manufacturer Malaysia, because they monitor the industry, and through every factory, their operators will certainly have the addresses of their workers. That is for the legitimate workers.

Gooi Hsiao-LeungPKR · PHBukit Tengah

Just a quick one, two-two isu saya harap Yang Berhormat EXCO dapat mengajilah sebab walaupun di Singapura the foreign worker they are staying in this public housing build by the government but there is still have requirement they have a register…(dengan izin), mereka ada satu daftar di mana factory operators terpaksa atau dikehendaki register pekerja-pekerja dengan pihak berkuasa because right now our hostel have not being build yet and so we have this masalah right now yang perlu kita tangani. Berkenaan dengan hostel yang ingin dibina di perkampungan Juru saya terpaksa bertanya sebab ada sikit kerisauan saya rasa Kerajaan Pulau Pinang boleh clear up some confusion yang selalu dibangkitkan oleh penduduk-penduduk di sekitar yang masih tak faham masalah yang pertama yang mereka membangkitkan adalah mereka mengkuatiri projek tersebut akan mengakibatkan lebih banyak banjir di kawasan tersebut. Ini adalah yang selalu-selalu disebutkan sebab tapak yang dikehendaki membina asrama itu berada di satu kelapa sawit punya area which they said all the water collected there building is build there so it will create more flood so that is one issue. The other issue is yang selalu ditanya adalah kenapa traffic is one the third of course I have received the answer for traffic, the traffic one is good

I notice here the government is intend to extend the road from two lane to four lane in that area so that I don’t think is a big issue. Third one is of course pertanyaan yang ditanya oleh penduduk di sana adalah kenapa Kerajaan tidak boleh membuat pertimbangan untuk membina asrama ini di satu kawasan yang lain sebab kawasan yang nak bina itu berada di kawasan perumahan? Jadi ini adalah satu soalan yang selalu dibangkitkan harap boleh dapatkan penjelasan.

Jagdeep Singh Deo A/L Karpal SinghDAP · PHDatok KeramatEN

In fact, Mr Speaker, regarding traffic, the written question has already been answered. Flooding is also similar, in that I believe that with this project, the flood and traffic problems that currently exist in the area will be addressed and resolved through this project. Number one, because it has already been required in its plan that the roads be enlarged, and measures have been taken to ensure there is no flooding and so on. Returning to the issue of whether other places can be identified: for the information of Mr Speaker, I can say that many other places will be identified in future for many more dormitories like this. But I believe this site is suitable, because we conducted a study within a radius of 5km from this site. There are also nearly 10,000 to 15,000 foreign workers now living in housing schemes. So with the existence of this housing scheme, we can absorb these foreign workers and at the same time solve the problem within the 5km radius of this site. But I think I should not touch on too many matters, because for the information of this House, there is a case at the Appeal Board on this issue, brought by residents who have, what, taken the case to the Appeal Board. So with that, Mr Speaker, I would like to end my speech by fully supporting the speech of TYT the other day. Thank you.

Speaker (Speaker)EN

Thank you, Yang Berhormat Datok Keramat. Honourable Members, before I adjourn the House, today happens to be the birthday of the Honourable Member for Pulau Betong. I wish him a Happy Birthday. Honourable Members, the House is adjourned and we will sit again at 2.30 later.

The House was adjourned at 1.05 pm.

The House resumed at 2.30 pm.

Secretary of the HouseEN

Honourable Members, Honourable Deputy Speaker. Deputy Speaker of the House: Honourable Members, we are now in the winding-up session. I invite the Honourable EXCO Member to speak.

Bismillahirrahmanirrahim, Assalamualaikum Warahmatullahi Wabarakatuh. Respectful greetings. Honourable Dato' Yang di-Pertua, first of all, allow me to record my appreciation and thanks for the opportunity given to me to wind up the debate during the First Meeting of the First Session of the Fourteenth Penang State Legislative Assembly (DUN). Firstly, regarding issues that touch on my responsibilities under my portfolio, such as the functions of the State Executive Council (MMK) for Domestic and International Information, Consumer Affairs, and Consumer Entrepreneurship and Cooperatives. I record my thousand thanks to all Honourable Members who took part in the debate, especially those involving my portfolio. First of all, I would like to congratulate Dato' Speaker, who has been given the responsibility of continuing the task for the second session, and also the Deputy Speaker who was appointed as Deputy Speaker, Sungai Bakap, who was appointed as Deputy Speaker for this session. This congratulation is also directed specifically to the Honourable Chief Minister, Padang Kota, who succeeded in forming the Penang State Government of Pakatan Harapan, continuing the legacy of the former Honourable Chief Minister, Tuan Lim Guan Eng, who is now the Minister of Finance. I also extend my millions of thanks to the voters of the Batu Maung State Constituency who gave me the mandate and trust to become the State Assemblyman (ADUN) for Batu Maung.

Honourable Dato' Yang di-Pertua, on this occasion I am also sitting on a different platform compared to 2008 and 2013. Previously I sat in Dato' Speaker's chair, now I sit in the Executive chair as a policymaker for the State Government. Honourable Dato' Speaker, I would like to draw the attention of the House to the fact that the formation of the Pakatan Harapan Government in Penang and Putrajaya came about through the uprising of the people who rose up demanding justice for Dato' Seri Anwar Ibrahim, who was sacked on 2 September 1998. Dato' Seri Anwar, who was firm in his principles of opposing corruption, cronyism and abuse of power, became an icon of the people fighting against the BN regime and demanding reform. We must not forget that the effort to capture Putrajaya was initiated by the reform figure Dato' Seri Anwar Ibrahim, and the seeds of reform that he sowed 20 years ago were finally reaped by us on 9 May, through Pakatan Harapan, the result of a consensus between Parti Keadilan Rakyat, DAP, Amanah and Bersatu. It is the result of this reform that marked the beginning of the coalition of opposition parties starting with Barisan Alternatif, Pakatan Rakyat and Pakatan Harapan. Unfortunately, our Pakatan Rakyat partner, Parti PAS, which was represented by the State Assemblyman (ADUN) for Penaga, did not join us in Pakatan Harapan, and we gained new partners, namely Amanah and Bersatu. May our reform figure Dato' Seri Anwar Ibrahim be installed as the eighth Prime Minister of Malaysia. Honourable Dato' Speaker, I would like to draw the attention of the House that the victory in Putrajaya was also the result of the sacrifices of the great opposition figures of that time, including the late Tuan Guru Nik Abdul Aziz, Lim Kit Siang, the late Karpal Singh, Mat Sabu, and also the former Honourable Chief Minister, Tuan Lim Guan Eng.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato' Fadzil Noor.

Oh yes, I forgot. Dato' Fadzil Noor was among the early figures who started the reform demands. Thank you, Padang Kota, for reminding me. The role of NGOs such as BERSIH, INVOKE and the young generation is also not forgotten. Nor is the sacrifice of the street reformists, those who lost their positions, lost their contracts and businesses, and were persecuted by the Barisan Nasional regime simply for demanding justice and truth. Some of them until now have not become YB, EXCO, Ministers, JKKK members, or filled positions in government-linked companies (GLCs). After GE14, Pakatan Harapan formed the Federal Government, and the consensus of the Pakatan Harapan parties placed Tun Mahathir, our experienced Prime Minister, as Prime Minister. Unity brings blessings, that is the strength of Pakatan Harapan, and this is the sweet moment of the reform struggle. We begin here: we rebuild the State of Penang that we love and the Nation of Malaysia that we cherish. Ten years ago I was in this House as Speaker when the Penang Barisan Nasional State Government fell in the 2008 General Election, when this House was in an uproar like a wounded tiger. The Opposition still could not accept the fact that they had become the Opposition. But this time, after GE14, there are only three (3) Opposition members left in the Penang State Legislative Assembly, and Barisan Nasional fell in Putrajaya. To my Opposition colleagues, I hope we can work together with the State Government to develop Penang as recommended by the Yang Di-Pertua Negeri of Penang in the opening speech of this DUN. Previously I was informed that several Federal Agencies were unwilling to give their full cooperation to the State Government. For 10 years, that cooperation did not happen between the Federal Government and the State Government, but now we are free. Alhamdulillah, at the MMK meeting of my third MMK, I have received the support of all Federal Agencies in the MMK meetings that we have held within the past two (2) months. Therefore, in the period leading up to these 100 days, one of the early steps I have taken involves Federal Agencies as MMK members under my portfolio. Answering the call of His Excellency that Penang should accelerate rapid development specifically for its people, I have outlined the direction of the portfolios under me. First, strengthening the Harapan Loan Scheme under the entrepreneurship portfolio. Second, realising Penang as a trade and industry state, subsequently involving the manufacturing sectors in Industry 4.0, and the State Government will take steps to plan digital transformation in driving Penang towards the implementation of this Industry 4.0 reform. Truly, ladies and gentlemen, Honourable Members, as mentioned by Kebun Bunga, this Industry 4.0 needs us to engage… (with permission) not only the industrial sector but also the micro SME sector involving retail. Aunties who sell kuih, those in the markets, and not only the factory sector but also the plantation sector and the health sector, and this is what we need to engage… (with permission). Truly, this digital technology era needs to be encouraged, and this knowledge needs to be spread to all the people of Penang and Malaysia in general. Many of us are still not used to or familiar with the terms Internet of Things, Artificial Intelligence, and even more so Industry 4.0. So, among the steps we will undertake is implementing a roadmap for Penang to look at digital transformation opportunities, this digital transformation, and we need to have a mission to make Penang a high-technology state leading ASEAN in this Industry 4.0. Honourable Members, under the Entrepreneurship portfolio we will also make the Penang Development Corporation (PDC) a one-stop agency secretariat for entrepreneurs. Alhamdulillah, with the cooperation of SME Corp, a database for all Penang entrepreneurs can be shared. We have information registered for all entrepreneurs registered with the Registrar of Companies (ROC) and the Companies Commission of Malaysia (SSM), who have records that can be shared with SME Corp. We will strive to produce and empower many Penang entrepreneurs, and likewise we will strive to upgrade the cooperatives in Penang, improving the performance of the cooperatives in Penang, especially those that are sometimes inactive, as well as those capable of continuing to improve their performance. Next, I will continue to answer the matters raised by Honourable Members under the MMK for Domestic and International Trade, especially answering the question of the Honourable Pantai Jerejak, who is not present here, regarding the issue of the closure of the Seagate and Fairchild factories in Penang: what was the reason these companies relocated, to which country did they relocate, and how is this matter being addressed? Based on INVEST PENANG records, Fairchild Company relocated out of Penang in September 2015, involving the retrenchment of 1,350 local workers. However, that relocation did not affect the resettlement of these workers, because Penang has the CAT (Career Assistant Training) that helps resettle these workers in other factory sectors that need these workers. It is understood that the closure of the factory was due to the stopping of the production line. Fairchild did not relocate to another country; only its production was stopped. Meanwhile, Seagate Company terminated its services in June 2017, and the closure of this factory was due to Seagate moving its operations to Thailand, described as (with permission) a normal corporate exercise. Seagate has a factory in Thailand and a factory in Penang. However, the Seagate IT Shared Services Center continues to operate in Penang. Honourable Dato' Speaker, regarding the question and suggestion by the Honourable Batu Uban, that the State Government review the conditions for young entrepreneurs who need capital to run a business, at least six (6) months before being considered for loan assistance or equipment. So far, the financial assistance organised by the State Government, namely the Harapan Scheme or Harapan Loan, the Harapan Loan Scheme (SPH), sets the age at 18 to 60 years, meaning we do not categorise the young; meaning young people aged between 18 and 60 years can apply for loans. However, there are other agencies such as TEKUN, and MARA also has special loan schemes for graduates and young people. SME Corp, for example, has the TUBE project, which opens every April; this year it has closed, April. MARA also has special programmes for young people. Regarding the question that stated that TEKUN had made it compulsory for applicants to obtain the support of the division chief, TEKUN now no longer makes it compulsory for applicants to obtain the support of the division chief. Moreover, verification can be done directly with the village headman and the ADUN of the areas where applicants reside. Honourable Dato' Speaker, in answering the question of the Honourable Bertam, there were complaints and grievances from the people that although GST has been abolished, the prices of goods are still high. For the information of Bertam, there is none. A survey of 65 price monitors from the Ministry of Domestic Trade, Co-operatives and Consumerism (KPDNKK) and Consumer Affairs at a total of 431 premises, including wet markets, grocery shops, supermarkets and hypermarkets throughout Penang, found that there was a price reduction of 50% for 417 selected consumer essentials. Of that total, 261 were zero-rated goods and 196 were goods rated at 6% GST. For the information of Bertam, the prices of consumer essentials were monitored daily, weekly and monthly throughout the period of implementation of the 6% GST and after GST was zero-rated on 1 June 2018. And the monitoring of goods prices will continue when the Sales and Service Tax (SST) is implemented in September 2018. Besides that, the Ministry of Home Affairs and Consumer Affairs (KPDNHEP) also implemented various enforcement actions starting from early 2018 to ensure that traders comply with the directives and laws enforced by this Ministry. Operation Catut 4.0, catut meaning traders who make excessive profits. To tackle the issue of unreasonable price increases of goods, it began on 1 June 2018. It was carried out on a large scale throughout the State of Penang involving KPDNHEP, the Royal Customs Department and the Local Authorities. It targets traders, especially in the retail sector for goods and services. For the information of all Members of this House, a total of 135 KPDNHEP enforcement officers in Penang went out into the field to carry out continuous monitoring and inspection of all types of goods and services at business premises involving wet markets, grocery shops, supermarkets and hypermarkets, to ensure there is no price manipulation activity by irresponsible traders. On the part of the State Government, we will activate all the consumer monitoring squads that have previously been set up by the State Government in every KADUN. To Members of the House

including the Honourable Bertam, you may make use of those squads to assist the State Government and KPDNHEP in monitoring goods prices and upholding consumer rights… (disturbance).

Satees A/L MuniandyDAP · PHBagan DalamEN

Request for clarification. Honourable Batu Maung. I would like to ask about the issue of the monitoring team set up by the former EXCO to carry out activities, if I am not mistaken, during the festive season last year or in 2016, when they went out to check prices at the markets. My question is whether this monitoring team will be paid any kind of allowance so that they will be more effective, because they were only given a shirt or a vest, if I am not mistaken, and we told them to go and monitor prices, and most of the time… (with permission) they were not interested. Is there any allowance or anything to be given to those who will carry out this monitoring? Perhaps not monthly, but when they go, perhaps a petrol allowance or a meal allowance? Please clarify.

Thank you, Bagan Dalam. So far we pay RM150.00 a month meeting allowance to 15 persons, not one each; those 15 persons, for one meeting held, is RM150.00.

Satees A/L MuniandyDAP · PHBagan DalamEN

Because when I was in Perai before, no one ever received any. So that is why I asked, I had no idea at all. Thank you for clarifying.

We will convene a meeting of the state government's monitoring group first, because previously we did not receive cooperation from the Ministry of Domestic Trade, Cooperatives and Consumerism (KPDNHEP). We had no enforcement power, so we carried out our own monitoring. It did not involve KPDNHEP because it is a Federal matter. Now it is easy and we are receiving good cooperation, so we will coordinate this monitoring group. This monitoring group, Insya-Allah, will not only monitor the prices of goods. In fact, we have also been requested by the Health Department to monitor the cleanliness of business premises and to monitor environmental conditions. So it is not limited to price control alone. For the information of the Honourable Members, Insya-Allah, Penang has also been selected to become the catalyst for the food bank. The Minister of Home Affairs and Consumer Affairs recently viewed the distribution…(with permission), how this food bank is set up in Penang. Insya-Allah the food bank programme will be continued on a large scale, not only in Penang as announced by the Honourable Minister of KPDNHEP. It will be spread out, or start in Penang and then extend to states across Malaysia. Honourable Dato' Speaker, next I will wind up, assisting on behalf of the Deputy Chief Minister, the State Assemblyman for Pinang Tunggal, whom we pray will be healthy and granted syifa' to return to duty. As enshrined in the Federal Constitution, Islam is the official religion of the Federation. Therefore the State Government will continue to strive to uphold the position of Islam by empowering Islam-related institutions, and by intensifying balanced human development programmes between worldly and hereafter matters, so that Penang in particular is able to produce a civilised society of noble character amid rapid development. The Pakatan Harapan State Government is determined and committed to supporting all efforts to uphold Islam by continuing the existing policies and programmes in this state. In answer to the question from Honourable Pantai Jerejak on using zakat money to implement free tuition for tahfiz students, what was specifically mentioned is that tahfiz students are given SPM tuition because when they study at tahfiz madrasahs they do not sit the SPM examination, so they need that qualification to continue their studies at public higher education institutions. The Penang State Islamic Religious Affairs Department, through its Education Division, will hold discussions with Zakat Pulau Pinang to finance free tuition for tahfiz students who wish to continue their studies at higher levels. The waqf funds mentioned will, Insya-Allah, be used for that purpose. For the information of the State Assemblyman and the Honourable Members, Zakat Pulau Pinang in fact does run financing programmes for the children of asnaf, the children of poor families, for programmes other than religious programmes. Zakat Pulau Pinang, particularly with PSDC, provides full sponsorship to students and children of asnaf to pursue skills certificate studies at PSDC. So far, a total of 317 students have benefited from the programme, with expenditure of RM4,111,294.00 from 2014 to 2017. There are also students who have been fully sponsored for diploma programmes: three (3) students were given full sponsorship for the Diploma in Engineering programme at PSDC. Among the courses offered, which give these students the opportunity, are the Certificate in Electronic Engineering, the Machining Operations Certificate Levels 2 and 3, the Industrial Quality Control Certificate, and the Automation Engineering Certificate. And these three (3) courses, apart from skills certificates, also include Diploma in Engineering courses that Zakat

fully sponsors. This programme, I am also informed, is also sponsored by Hindu Endowments for students at PSDC. So this is to answer the question from Honourable Pantai Jerejak, who proposed that zakat waqf money be used to sponsor and provide scholarships to students from poor families. Zakat is only for asnaf and poor students. So this is what has been and is being done. Next is the mention of courses at KITAB. Next I want to go to KITAB. Answering the question from Permatang Pasir: Permatang Pasir raised the issue of the Chief Executive Officer of Zakat Pulau Pinang. For the information of Permatang Pasir, regarding the appointment of the Chief Executive Officer of Zakat Pulau Pinang, the post has been vacant for a long time. Zakat Pulau Pinang had to wait for the outcome of the court process for the previous CEO case. While the prosecution was in court, the CEO post was still not vacant, and to avoid legal implications it could not be filled. Once the court case was concluded, ZPP had already advertised the vacancy, opening it to applicants. There are vacancies in Zakat Pulau Pinang, including the recently advertised post of CEO of Zakat Pulau Pinang. Next, in answer to the question from Sungai Dua on the accreditation of the International Islamic College of Technology: for the information of the Honourable Sungai Dua, the Penang State Quranic Tahfiz Institute (Maahad Tahfiz Al-Quran Wal Qiraat Negeri Pulau Pinang) was established by the Penang Islamic Religious Council in 1995 with full funding from Zakat Pulau Pinang. It is open to male students only, from all states in Malaysia. These students live in full-time boarding to study the Quran, and are registered to sit examinations with Darul Quran, JAKIM. Certificates are issued by Darul Quran, JAKIM. In 2004, in view of the need for Penang to have an Islamic college, the Penang Islamic Religious Council decided to recognise the Quranic Tahfiz Institute as the International Islamic College of Technology, or in short called KITAB. The aim was to continue the Quranic memorisation programme and add other study programmes. Along with this, the Tahfiz Diploma, Syariah Diploma, Finance Diploma, Banking Diploma and Qiraat Diploma were developed. All courses offered at the Tahfiz Institute were included in the Tahfiz Diploma programme and supplemented with other courses, including English, Arabic, and one current elective from five (5) courses in the field of syariah, qiraat or dakwah. Thus the Tahfiz Diploma consists of 32 courses or 96 credits, and has received accreditation from the Malaysian Qualifications Agency (MQA) and the Ministry of Education Malaysia, and has obtained full accreditation. In terms of students, the Tahfiz Diploma is open to male and female students. Students born in Penang, or whose parents were born in Penang, are eligible to receive full funding from Zakat Pulau Pinang's contributions, namely payment for accommodation, tuition fees, meals and drinks, and a monthly allowance for 9 semesters (3 years). Thus KITAB has upgraded tahfiz studies to diploma level and has also expanded opportunities to female students. To maintain the quality of memorisation, all students registered for the Tahfiz Diploma are required to sit an Arabic test when they register for the first semester. If their achievement is found to be below 70%, these students are required to follow an intensive Arabic course for one semester, namely 20 hours multiplied by 14 weeks, or 280 hours, and are tested at the end of the semester. This is done so that Tahfiz Diploma students need to or obtain a sufficient level of Arabic proficiency to assist in memorising the Quran and to be able to understand Quranic recitation. Because the Tahfiz Diploma at KITAB has MQA accreditation, students obtain credit transfers to continue their studies at other IPTAs or IPTSs at the Bachelor's degree level in Quranic Studies or Islamic Studies. Many Tahfiz Diploma graduates from KITAB have completed postgraduate studies and are registered for doctoral degrees at IPTAs. In terms of careers, Tahfiz Diploma graduates from KITAB have been well received as mosque imams in Penang State and as religious officers in religious departments and Islamic religious divisions in the public and private sectors. KITAB is running a Bachelor's degree programme with the Universitas Islam in North Sumatra, Medan, in the fields of syariah, family law and usulludin. Tahfiz graduates have been recognised for registration in this programme and have obtained credit transfers. This programme has also received MQA accreditation and has been running for more than six (6) years at KITAB. A little more that…(interruption).

Syerleena Binti Abdul RashidDAP · PHSeri DelimaEN

Deputy Speaker, may I interject. Actually I would like a little clarification, because in the Seri Delima area there is a Rohingya tahfiz school. I understand that there are such tahfiz schools throughout Penang State as well. So my question is, is the same SOP applied to Rohingya tahfiz schools, and also to the courses the Honourable Member just mentioned, such as the diploma course, the schools, Arabic classes and so on? Are those students, particularly the Rohingya students, given the same opportunity to take those courses?

Thank you, Seri Delima. So far, the Education Division of the Penang Islamic Religious Affairs Department (JAIPP) encourages tahfiz madrasahs to register with the Penang Islamic Religious Affairs Department, so that if there are courses or assistance, we can channel them, because we need to be careful. Sometimes the kitab used may differ, or the teachings may differ. So far we only encourage them to register in order to receive assistance from JAIPP. If they register, then we on the Islamic Religious Council side can monitor and recognise the curriculum they use in these tahfiz madrasahs.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Clarification. Thank you, Pantai Jerejak, and also Deputy Speaker. I take it that the State Government has taken a rather good step in upgrading the state tahfiz madrasah to the International Islamic College of Technology (KITAB). However, I see here that KITAB is increasingly declining in terms of its students. Perhaps the students are not very interested in continuing their studies at KITAB. Does the State Government, or the EXCO, conduct an analysis of why this is happening? Is it because of the environment, or for other reasons apart from the field, since the memorisation focus has been combined with other courses? Has a study been conducted from this angle by the State Government to assess why the decline has occurred? In the past there were many; I know that in the past many people entered the state tahfiz madrasah, but now it has begun to experience a decline in the number of students and so on. Has a study been conducted?

Thank you, Sungai Dua. Indeed, the Penang Islamic Religious Council (MAIPP), when I was at MAIPP as Deputy Speaker, was proposed. KITAB actually has its own strengths. The name KITAB itself is a strength: Kolej Islam Teknologi Antarabangsa. Nowadays, if colleges apply for the word 'Antarabangsa', they simply cannot get it. But in terms of technology, if we look at KITAB, there are no technology courses at all. So we propose that the course offerings be reviewed. Reviewed so that there are courses that meet market demand…(with permission). Courses that the job market requires should be offered at KITAB, and among those proposed that day were Information Technology courses, Halal Management, and Waqf at KITAB. Managing a college is not easy with its constraints. Many private higher education institutions have even closed down. Actually, Zakat Pulau Pinang channels RM3 million every year to finance KITAB. That is still not enough. I would like Penang to need many software engineers and design engineers. If possible, I could propose that KITAB become like the Indian Institutes of Technology. Even getting into one of the seven (7) Indian Institutes of Technology is difficult, and graduates of the Indian Institutes of Technology are then exported directly to the United States. If possible, KITAB should become like that. Hire lecturers from India who are skilled in that field, and the waqf money we have, RM60 million, which we have not spent, may be proposals we can use to lead this International Islamic College of Technology. Yes, Sungai Dua.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Request to speak. I understand that the state tahfiz madrasah was placed under KITAB; KITAB was not established for it. Earlier I heard the answer from the Honourable Batu Maung that there are still no technology courses at KITAB. Are they still not available? So in a situation where the tahfiz madrasah is getting weaker and at the same time technology courses have still not been conducted, I see that the function of KITAB, its objective, is not being achieved. So, are there any proposals from the state to separate the tahfiz madrasah again so that it stands in its own name to achieve its objective as a leading tahfiz centre in the country? Let there be a tahfiz madrasah in Penang State that becomes a leading tahfiz centre, as in Selangor State and so on, and let KITAB focus on technology so that both perform their respective functions, because this mixing up has caused both to not run well. Seeking clarification, thank you.

Thank you, Permatang Pasir. There are indeed efforts and proposals to return it to its original state before KITAB was established. It is still under deliberation, still ongoing, so we hope these proposals will be considered for the good of KITAB, so that we can realise what is good for KITAB…(interruption).

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Just a little more. Do these tahfiz students need to take the tahfiz field and also technology, or is it separated, technology only, with tahfiz set aside? I want that clarification. If it is tahfiz only, there may be tahfiz students, but when tahfiz and technology are combined, it is sometimes difficult to find students who are tahfiz but also have a science background and so on; it is indeed difficult to find. So perhaps the focus should be on tahfiz only. So we have to look at new schools, perhaps like MRSM, Ulul Albab, where it may be possible. But for tahfiz

in the villages, the private ones and so on, it is difficult for them to go to the technology field at KITAB. That is the problem. I see it.

Sungai Dua, indeed, if we look at the development of several states that have these Islamic colleges, we can see such combinations. That means there are syariah courses, but there is another major, for example IT, and yes, it does exist. Insya-Allah these proposals can be brought to KITAB so that students can be attracted back to KITAB. Thank you. May I continue?

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Meeting procedure. Mr Speaker, in accordance with Standing Order 6A(1), the Rules of Meeting of the Penang State Legislative Assembly (Peraturan-Peraturan Majlis Mesyuarat Dewan Undangan Negeri Pulau Pinang), I move that the sitting time for today, 9 August, Thursday, be extended until 10.00 p.m.

Deputy Speaker of the House

Ada sokongan?

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

I beg to second.

Deputy Speaker of the HouseEN

Honourable Members, the Honourable Chief Minister has put forward a motion under Standing Order 6A(1) to extend the sitting time for today, 9 August 2018, Thursday, until 10.00 p.m. Honourable Members who agree, say 'Yes'. Members of the House: "Yes."

Deputy Speaker of the HouseEN

Honourable Members who do not agree, say 'No'. The majority agree; the motion is carried.

I continue, Dato' Speaker.

Deputy Speaker of the HouseEN

Continue, Batu Maung.

In regard to the questions from the State Assemblyman for Sungai Dua and the State Assemblyman for Permatang Pasir on additional ex gratia payments to KAFA teachers, the State Government will consider it. For the information of KAFA teachers, they receive payment from the Federal Government through JAKIM of RM900.00 a month, and the State Government gives an additional ex gratia payment of RM50.00 a month. This does not include the annual bonus given by the State Government. Next, the issue of the fatwa raised by the State Assemblyman for Sungai Dua, which was approved but not gazetted. There are several fatwa decisions that have been decided by the Penang State Fatwa Committee which are still in the process of being gazetted in the near future. The status of the fatwa concerned is at the final stage of review for the purpose of updating the sirah, and gazettement so that it complies with legal requirements and current needs. It is worth stating that although these fatwas have not yet been gazetted, they nevertheless remain official legal rulings that must be complied with. The State Government always ensures that the gazettement process for any fatwa is carried out in an orderly manner, as required by the existing legal procedures. Thank you.

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Batu Maung Member, I just want a little clarification so as not to be confused. In the last session, the issue was raised that a fatwa that had been agreed upon, which had been decided, must be discussed and tabled at the EXCO meeting. Is this really happening? Because we feel that a fatwa that has been agreed should be raised directly to the highest level, perhaps the Agong, for agreement, without us having to include it in the EXCO meeting. If that is true, or if it is not true, please explain. Is it true that this happens?

As I mentioned earlier, this fatwa may be reviewed before it is tabled at the EXCO for information. It can be reviewed. As I mentioned earlier, before it is gazetted. Any review is to comply with legal procedures. Sometimes that review causes delay. Thank you. But it is still a ruling that must be complied with, that is clear.

Deputy Speaker of the HouseEN

Has the Honourable Batu Maung finished?

Oh! I will continue. Next, I am answering the ADUN for Penanti, who proposed that the Penang Islamic Religious Council (MAINPP) acquire land to be developed as an Elderly Care Centre so that the target group receives good care. For the information of the Member for Penanti, at present MAINPP, in collaboration with Yayasan Al-Bukhary, has built the Darul Hanan Elderly Complex, Pongsu Seribu Kepala Batas, on land measuring 8 acres. The complex began operations on 1 February 2010 and can accommodate 200 Muslim elderly men and women at any one time. To date, 69 residents have been registered. Accordingly, the complex is still able to accommodate the increasing number of Muslim elderly who need care in this state.

To answer the question from the Member for Permatang Berangan, who raised the question of the legal provisions used to govern waqf land and whether waqf land is placed in the same category as RIBI (Rumah Ibadat Bukan Islam, non-Muslim places of worship). For the information of the Member for Permatang Berangan, this matter has been answered in a written reply. The management of waqf land is guided by the provisions of the Islamic Administration Enactment of the State of Penang 2004, under which MAINPP is the sole trustee of waqf, nazar and trusts relating to Islamic religious affairs. Meanwhile, RIBI is governed by the RIBI Coordinating Committee under the State Town and Village Planning Department of Penang.

For the next answer, to the question from the Member for Permatang Berangan on how the application process for halal certification can be facilitated and bureaucratic red tape reduced: efforts to reduce bureaucratic red tape in halal certification applications have already been implemented through the Malaysia Halal Certification Fast-Track Initiative (ISPHM), administered by the Halal Management Division, Penang Islamic Religious Affairs Department (JHEAIPP), since December 2017. ISPHM sets out 3 methods, namely white list, fast track, that is the process and audit, and combo audit, by stipulating certain conditions that must be met by applicants, including the prompt payment of fees, complete supporting documents and others. The approval periods for Malaysian halal certification are as follows:-(i). White list – 1 to 3 working days after receiving the application (ii). Fast track – 5 to 14 working days (iii). Combo audit – 14 to 30 working days. For applications categorised as white list and fast track, that is without going through the auditing process, processing is only carried out for non-critical applications, such as those not involving slaughter, cleaning of meat or chicken, where no records of non-compliance are found or only minor non-compliance is found.

Next, the question from the Member for Permatang Berangan, who again raised the issue of backlogged Syariah Court cases and how to expedite divorce cases…(interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Excuse me. If I am not mistaken, both issues were asked by the Member for Permatang Pasir: the halal certification issue and the issue of strengthening the Syariah Court. I request that it be checked and corrected. Thank you.

Thank you. I apologise for mentioning the Member for Permatang Berangan here; it was in fact the Member for Permatang Pasir.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Pasir, not Berangan. The daydreaming is over, I have already won.

Okay. So the issue of Syariah Court cases is from the Member for Permatang Pasir?

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

The halal certification and also the Syariah Court.

Thank you, Member for Permatang Pasir, for pointing out and correcting my typing error, I think. The issue of backlogged Syariah Court cases and how divorce cases and maintenance claims can be expedited. The Penang Syariah Judiciary Department has implemented several initiatives to expedite the resolution of divorce and maintenance cases in the Syariah Court. Among the efforts is improving the performance of case resolution in the Syariah Court through the setting of KPIs for judges. Each judge will be given a target to resolve cases registered in the same year as well as cases that exceed the prescribed period. Second is the implementation of mandatory maintenance orders to expedite the resolution of cases concerning eddah maintenance for wives and child maintenance. Through this method, the judge will issue a divorce order together with an eddah maintenance order and child maintenance at the rate prescribed. Accordingly, former wives no longer need to make separate claims for eddah maintenance and child maintenance. Therefore, this procedure can ease the burden and save costs for former wives in making new claims in the Syariah Court. Next, the third step is to implement an innovation project…(interruption).

Muhamad Yusoff Bin Mohd. NoorUMNO · BNSungai DuaEN

Additionally, regarding the court case just now, divorce cases. When a divorce takes place, sometimes it takes a long time, as the Member for Permatang Pasir raised. It takes a long time to resolve the case. The court takes a long time, and this causes problems for the wife. So, just now, the procedure to expedite it was presented, to try to ensure it is done properly and resolved quickly. Otherwise, problems will arise. Second, regarding maintenance. Maintenance is sometimes agreed in court, an order is passed, maintenance is set at such-and-such an amount, but sometimes the husband does not pay at all. Does not pay at all, does not give maintenance at all. With maintenance claims, sometimes the wife does not get anything, she has to work and so on, and what steps are we going to take to ensure that enforcement is carried out so that the husband must pay. Even when she goes to court, sometimes she is slow to recover the maintenance, or gets none at all. So, it is pitiful for the wife who has children to support and who has to earn her own living. She does not receive maintenance from her husband. Thank you.

Member for Sungai Dua, the views and proposal will be taken into account on how we can expedite it and help if this implementation cannot be carried out. The third point, to expedite the process. This is the third, implementing an innovation project, namely the e-siap system with the slogan 'Agree today, settle today', which aims to resolve cases of mutual agreement, including divorce, within 1 hour of the record of mutual agreement.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

A brief explanation regarding the proposal of the Member for Sungai Dua. With your permission, Member for Batu Maung: under the court provisions of the Islamic Family Law Enactment, if the father is unable to provide maintenance to the child, the responsibility shifts to the grandfather, other heirs, or, if there is no grandfather, to the uncle, and after that to Baitulmal. So what delays this process is that once the order is made, if the father does not pay, the mother or the former wife must file the case again. That is what causes the delay, because not all women out there know about the law. So my proposal is to create an SOP in these maintenance cases so that the judge directly asks the wife applicant whether the husband is still alive or not. Whether the husband is still in contact or not. If the husband is no longer in contact, the husband has deserted the wife, what harm is there in the court directly summoning the grandfather or the paternal uncles and brothers of the husband to come to court so that we can inquire into his ability to provide maintenance. If he is unable, then Baitulmal pays the maintenance directly so that the children's problems and family problems can be resolved, because Baitulmal has a large allocation, established specifically to help the poor among Muslims, and we need to, this is what is meant by reducing and minimising bureaucratic red tape. We continue with the fast track case without needing to file two or three cases. The judge or the Penang Syariah Judiciary Department can play a role by carrying out the SOP by conducting a direct inquiry in such cases. Please provide an explanation.

Thank you, Member for Permatang Pasir. The proposal put forward will be brought to the Syariah Judiciary Department for consideration, and we will also look at the need for family counselling so that these matters can be resolved before they reach the stage of divorce. If family counselling centres can be established, in addition to those existing at the Penang Islamic Religious Affairs Department (JHEAIPP), for matters involving these Muslim families. Perhaps with the proposal of the Member for Permatang Pasir, these matters can be addressed at the grassroots level even further. Thank you.

I will continue with the answer to the ADUN for Penaga, who raised the issue of beliefs contrary to Islam in mosques and surau, where mosques and surau should be free from any political ideology. This issue has been answered in the written reply. To address the issue of the delivery of lectures or sermons that touch on the sensitivities of certain groups, so that the sanctity of mosques is protected from negative elements, the State Government, through the Penang Islamic Religious Council (MAINPP), issued the Guidelines for Invited Preachers in 2010. All mosques have been directed to refer to these guidelines in matters relating to talks, lectures and Friday sermons so that their implementation does not trigger undesirable matters. In addition, monitoring is also carried out from time to time by the Teaching Authorisation Committee to ensure these guidelines are complied with, and to issue warnings to the parties involved if there are complaints in this regard. On the issue of deviant beliefs and misguided teachings such as the Shia teachings, this has also been answered in the written reply. JHEAIPP continuously carries out investigations, and if there is clear evidence, firm action in accordance with the legal position will be taken against those involved in Shia teachings in the State of Penang. Investigations and actions focus more on the involvement of individuals and small groups. To curb these teachings, JHEAIPP always carries out collaborative action with the Royal Malaysia Police (PDRM) and the Ministry of Home Affairs (KDN), restricting publications and printed materials relating to Shia teachings from continuing to be widely circulated in this state. The actions taken also refer to the Fatwa on Shia Teachings that was gazetted in the State of Penang on 27 March 2014. Next, regarding the status of the waqf land on which the Islamic Hospital is to be developed, behind Masjid Bayan Baru. That land is not waqf land, it is Baitulmal land, and at this time MAINPP and the Penang Islamic Foundation are still in the stage of preparing the agreement for the land lease and MAINPP's returns for the establishment of the Islamic Hospital. Meanwhile, the Penang Islamic Foundation has already submitted an application for Planning Permission to the local authority (PBT). To answer the question of the ADUN for Penanti regarding the study conducted by PDC on the waqf land of Sekolah Agama Al Massiah, Mengkuang in Penanti, MAIPP submitted a first letter on 8 March and 27 March to PDC to carry out a feasibility study …(with permission), on several MAIPP lots of land with development potential. A series of studies were carried out at the meeting of 27 July 2017 and it was proposed to appoint PDC as PMC, Project Management Consultant…(with permission), for MAIPP. However, on 15 August 2017 PDC rejected the appointment due to constraints of professional manpower for the monitoring and project management work handled by PDC. Following all this, the development proposal on the waqf land has been submitted and will be managed by MAIPP's own subsidiary, Wakaf Pulau Pinang Sdn Bhd, which began operations on 8 January 2018. Finally, answering the question of the ADUN for Bayan Lepas, who raised the minimum age of marriage for men and women. For Muslims, under Section 8 of the Penang State Islamic Family Law Enactment 2004, the minimum marriageable age for men is 18 years, while for women the minimum marriageable age is 16 years and above. However, men and women may marry below the age of 18 and 16 respectively, on condition that they first obtain permission from the Syariah Court. The ADUN for Sungai Dua raised the issue of the increasingly cramped cemetery land around Masjid Jamek Haji Abdullah Fahim, Permatang Sungai Dua. For the information of the Honourable Member, sorry, Masjid Abdul Rashid, Masjid Jamek Al-Rashid. For the information of the Honourable Member, the Penang Islamic Affairs Department (JAIPP) has provided a central Islamic cemetery site at Permatang Langsat, Bertam, measuring 8 acres. There is also an Islamic cemetery at Bandar Baru Perda on Lot P.T. 3006 Mukim 6, SPT. This Perda cemetery site, measuring 4.56 acres, can be accessed via Jalan Perda Barat, Bandar Baru PERDA.

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Explanation. Regarding the central cemetery at Paya Keladi, Pinang Tunggal, Permatang Langsat, I think it is rather far, Permatang Langsat to Bandar Perda and so on. If possible, we would like the Council and JAIPP to discuss again with my congregation. Some of my congregation have waqf land, perhaps general waqf or waqf specifically for graves. To be discussed so that it can be built, or find a place in a nearby area as a central cemetery. If the place just now is rather far. There are still many places in Sungai Dua, perhaps in other areas where the cemetery land is already becoming cramped, and with additional housing estates, it will become even more cramped. If possible, we ask the Council to discuss further, to hold a special discussion on the cemetery problem. We want to make a decision, but close to that place, whether to build vertically or what, we have to discuss it again. Please arrange a discussion, because for areas that are already cramped, places that no longer have cemetery land will cause problems. Sometimes Malays, Muslims, their families there do not want to move to another place; they say it is near, although it is not in the law, that area is their grandparents' area, they do not want to move to another place. This is also a problem, this is something we also have to discuss further.

Thank you. JAIPP or the Council welcomes any land that is offered for waqf, as mentioned by the Honourable Member for Sungai Dua, land that is more strategic and closer for us to consider. We must realise that Penang is a small state and not a large state for these cemetery lands, but if there are proposals, if there are people who wish to endow such land as waqf, MAIPP or JAIPP is ready to accept this proposal. Thank you.

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

I ask the Religious Council or JAIPP to convene a discussion so that we can discuss it. If it is in Sungai Dua, I will go down there, we will discuss to resolve this problem, otherwise it will not be resolved. In Sungai Dua there is one waqf land specifically for graves in the Kampong Telok area, but there are houses on it. We must resolve this problem.

Thank you, Sungai Dua. Regarding the allocation for the Permatang Bogak Mosque and the Rakyat Religious School project which was previously postponed, JAIPP will review this application again and apply for an allocation to include the school according to priorities and the financial capacity of the State Government. This includes an allocation to address the issue of the cramped Bayan Lepas Mosque and the limited parking. Regarding the issue of waqf land involved in acquisition by the Government, for the information of the Honourable Member, MAIPP receives compensation payment in the form of money and not land replacement. Except for one case involving the waqf land of the State Mosque, where MAIPP applied for compensation in the form of land replacement, and this application is now being processed by the State Authority…(interruption).

Muhamad Yusoff bin Mohd NoorUMNO · BNSungai DuaEN

Regarding the earlier issue, the Permatang Bogak Mosque and the Permatang Buloh Religious School, this mosque has been approved. Permatang Bogak has already started groundbreaking work and building the mosque. Land work has been done and the land that was endowed has been filled. Only the allocation for the construction of the mosque has been approved, before the election, it has been approved, including at Permatang Buloh, it has been approved, only the tender has not been issued, at the ICU stage at that time. If possible, like the YB for Pantai Jerjak raised, in which area, Batu Maung, it was withdrawn and then reapplied for and approved again. I also request the same, it has been approved, we ask to have it included again because of the need at Permatang Bogak, the mosque is no longer safe, and at Permatang Buloh the religious school is small, only one building, where 7 villages send their children to school and face problems. It has been approved, only we ask for it to be included again, thank you.

Thank you, Sungai Dua. Pantai Jerejak mentioned earlier the issue of the Masjid Sungai Nibong Besar, which was originally 9 mosques and religious schools that had been approved but were postponed due to financial constraints by the Federal Government. However, for everyone's information, the Masjid Sungai Nibong Besar has already received approval to proceed again. Insya-Allah, we will apply for a review of the freezing of these projects by the Implementation Coordination Unit (ICU), in accordance with the capacity of the Federal Government. Finally, regarding the question on waqf land in the Telok Ayer Tawar State Constituency (DUN), a written reply has been given to the Honourable ADUN for Telok Ayer Tawar. Meanwhile, MAIPP does not have current valuation data on those lands. Valuation will only be carried out when there is a need, since it involves high costs that must be paid to the valuer. Telok Ayer Tawar asked about the valuation of these lands. Before I end my winding-up speech, I would like to record my appreciation and thanks to the Honourable State Secretary, the State Financial Officer, who have greatly helped in the successful implementation of the State Government's policies. I also do not forget all the civil servants of the State Government and the Federal Government, and all the helpful State Government departments, at the Office of the State Secretary, the State Economic Planning Unit, the State Finance Department, all five District and Land Offices, as well as Federal agencies such as MITI, MIDA, MATRADE, SKM and Angkasa, which have all along given very good cooperation to my portfolio. The State Government agencies, including PDC, Invest Penang, PWDC, local authorities such as MBPP and MPSP, and the Chinese, Indian and Malay trade associations, and FMM, which have helped and cooperated in carrying out the responsibilities as Chairman of the MMK Committee on Information and State, Entrepreneurship, Development, Consumer Affairs and Operations. Lastly, I do not forget to thank the voters of Batu Maung who chose me as their representative in the 14th General Election (PRU 14) on 9 May 2018.

Dato' Yang di-Pertua, together we uphold our promise to the people of Penang, who hope and place their trust in us to provide the best service. That is all, and with that I humbly move for support. Assalamualaikum w.b.t.

Deputy Speaker of the HouseEN

Thank you, YB Batu Uban, Batu Maung, sorry. The floor is given to the Honourable Member, the Assemblyman for Tanjung Bunga.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Mr Speaker. First, I would like to record my gratitude for having the opportunity to deliver the winding-up speech in this esteemed House. Previously, as a Member of the House of Representatives in the last term, I only had the opportunity to debate and ask questions, but now in the Penang State Legislative Assembly I am entrusted to answer on behalf of the Government. I also wish to convey my highest appreciation to all the Honourable Members who have debated the motion of thanks to the Yang Terutama Yang di-Pertua Negeri of Penang, particularly those relating to matters under the portfolio of Public Works, Utilities and also Flood Mitigation. Many have raised interesting arguments, and certainly this administration will give attention to any proposals that can lead to the welfare of the people of Penang in general. Mr Speaker, after 10 years of administering as the Opposition Government, as the TYT Tun said in his speech on the occasion of the Opening Ceremony of the State Legislative Assembly the other day, the Penang Government now has a golden opportunity to realise infrastructure development very vigorously. In the past, many infrastructure projects that were planned could not be materialised or were hindered for purely political interests, whether public transport projects or flood mitigation projects. Now I am confident we can expect good cooperation from the new Pakatan Harapan Federal Government. Indeed, the current state of infrastructure in the State of Penang is relatively still backward and not in line with the status of this state as the foremost secondary city after Kuala Lumpur. Penang aims to become an internationally standard Smart City, but this target will not be achievable if our infrastructure is incomplete or underdeveloped, especially on the Island, which has long been neglected. Unlike Seberang Perai, which has a more orderly infrastructure and road hierarchy with the North-South Expressway as its backbone, on the Island side we do not have such complete infrastructure due to land scarcity and various other constraints. The only highway that exists is the Tun Lim Chong Eu Expressway, as stated by YAB Ketua Menteri the other day, which is not a dedicated highway and in fact has various junctions that hinder the smooth flow of traffic. Therefore, this administration is committed to upgrading infrastructure across the entire State of Penang for the benefit of the people. Apart from projects under the Penang Transport Master Plan (PTMP) as well as three major roads and an undersea tunnel, there are many other infrastructure construction projects being implemented by various agencies such as the Public Works Department (JKR), local authorities and also the Penang Development Corporation (PDC). Mr Speaker, I am pleased to inform that currently the State Government is actively continuing the implementation of 14 road upgrading construction projects allocated in the 2018 Budget, with a development allocation totalling RM12,448,738.17, of which one project has been completed in construction, three (3) projects are still in the construction stage, eight (8) projects are at the design and preliminary works stage, one project is postponed and one project is a token project. The State Government always ensures sustainable infrastructure development in this state, and in this regard every infrastructure project is carefully planned based on current needs and the allocations available. Allow me to refer to the question raised by YB Batu Uban regarding the State Government's action to monitor the maintenance of Federal roads which are unsatisfactory, and also the concessions appointed by the Federal side, such as on Jalan Sultan Azlan Shah and other Federal roads. For the information of the Honourable Member, the State Government, through the Penang JKR, has identified several deficiencies and local issues involving the scope of work under the road maintenance concession company appointed by the Ministry of Public Works. The Penang JKR is now proposing to increase the frequency of maintenance by the concessionaire from two (2) times a year to four (4) times a year, depending on issues and also consumer complaints, especially those involving cleaning works on Federal roads. In addition, monthly audits are also carried out by the JKR. And if there is any non-compliance by the concessionaire, then the JKR may take action by making deductions from payments to the concessionaire.

In addition, I would like to inform once again, the State Government is currently studying a proposal to gazette all Federal roads on the Island side as State roads, so that their maintenance can be more easily monitored under the State Government. For the information of the Honourable Member, the total length of Federal roads on the Island side is 103.93 km. However, which roads will be involved in the proposed re-gazettement is still being identified and will be studied as a whole according to the capacity of the Road Authority at the State Government level.

Mr Speaker, referring to the question raised by the Honourable Member for Penanti, namely whether the State Government may apply to the Federal Government to consider increasing the allocation for basic infrastructure maintenance for drains, roads, street lights and also fire hydrants. For the information of the Honourable Member for Penanti, though he is not here today, the need for allocation for basic infrastructure maintenance is based on current issues and complaints from residents. The Road Authorities, namely the Penang JKR or the Penang Island City Council (MBPP) or MPSP (Seberang Perai Municipal Council), subject to their respective areas, will inform the current allocation needs and additional allocations for road maintenance involving drains, roads and street lights to the State Finance Department (JKN) (Jabatan Kewangan Negeri Pulau Pinang) to be applied to the Federal Government through the Ministry of Finance under the MARRIS allocation. Meanwhile, maintenance of fire hydrants is under the jurisdiction of the Fire and Rescue Department (Bomba) under the Ministry of Housing and Local Government, where maintenance is carried out based on current needs and identified through annual inspections and complaints received.

Mr Speaker, I would like to respond to the issue raised by the Honourable Member for Bertam, who conveyed the request of residents that the road widening project at Kampung Datuk, Kepala Batas, from two (2) lanes to four (4) lanes be reviewed because its implementation is feared to cause flooding, as well as the issue of land compensation that is inadequate for obtaining new land. In principle, before any road upgrading project is implemented, the JKR will carry out survey work involving flood data and the enlargement of road drains to accommodate rainwater, which also takes into account the surface area of the new road to be built. So far, the project team has not received any objection or official complaint regarding flooding. However, there is indeed an issue raised by residents who are dissatisfied with the rumoured low land compensation payments, whereas the land acquisition has not, in fact, yet been discussed and is still at the review stage by the Legal Adviser at the Ministry of Public Works. Nevertheless, I have studied the petition given by the Honourable Member for Bertam from the residents of Kampung Datuk and I have noted its contents. Furthermore, I have also forwarded the residents' concerns to the Ministry of Public Works to be discussed at the Contract Coordination Panel (CCP) meeting which was in fact held yesterday evening, 8 August 2018. For now, the progress of work on site has not reached 15% yet and only involves preliminary works or in fact site clearance, on the site, the land belonging to the Government, so there is not yet much work and it is not too late to take action. That is the point I wanted to make. So if the Ministry of Public Works finds that the implementation of the project brings harmful effects, then I believe this project will be reviewed.

Mr Speaker, I also observe that the Honourable Member for Air Itam has raised the issue concerning the spelling of the area, where 'Air Itam' has several different spellings. As Chairman of the Penang State Geographical Names Committee, which also comprises the Honourable Member for KOMTAR, the Honourable Member for Pulau Tikus and the Honourable Member for Bagan Dalam, I have initiated the process of correcting road names. For example, I have approved the renaming of Lorong Kuching in Pulau Tikus, which had been spelt as the animal cat. In fact, that road was named after, and derived its name from, the state capital of Sarawak, Kuching, with C-H, and not the animal cat. So, we have corrected it. And for Jalan Muntri, we will also correct it to Lebuh Muntri because in English, the original name is Muntri Street and not Muntri Road. Yes, so the correction, we do all of this. The problem raised by this Honourable Member, the Honourable Member for Air Itam, is essentially caused by the change of spelling made following the standardisation of the Malay language initiated by the Institute of Language and Literature (Dewan Bahasa dan Pustaka) in 1972. In that year, the Malaysian Government and the Indonesian Government agreed to use the standard Malay spelling. So the old spelling for "air" was "ayer", as in Jalan Ayer Rajah which has been renamed Jalan Tunku Abdul Rahman. The spelling "Itam" is based on colloquial speech, where many people pronounce hitam (black) as "itam".

I agree with the Honourable Member that it would be advisable for the spelling of the area's name to be standardised. Therefore, after checking with the PEGIS system, I found that the name of the town Air Itam gazetted under the Kanun Tanah Negara is "A-Y-E-R I-T-A-M". This means that this spelling is what will be displayed in the land title deed (land title deed). So, if we look at the land title, "A-Y-E-R I-T-A-M". Therefore, my proposal is to use that spelling, "A-Y-E-R I-T-A-M", as the correct spelling for all road names and signboards. Therefore, I suggest that the Honourable Member may hold a public consultation, with the residents of the area first, and if agreement is obtained, may submit the proposal to my office.

Mr Speaker, next, allow me... (interruption). Yes, yes. Please, please.

Joseph Ng Soon SiangDAP · PHAir ItamEN

Honourable Member for Tanjung Bunga, does this mean that in front of me I also have to change to the Assemblyman for Ayer Itam? To avoid confusion.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, I suggest we try to correct it together with the Election Commission (SPR) too. I have the same problem. Tanjong Bunga also has many spellings. Tanjong Tokong, Tanjong Bunga. Actually, it... it... this matter is indeed one (1) problem, we look at the signboard, the signboards on the road too, I will show Tanjong Bunga with one "H" and without one "H". The constituency in the SPR does not have an "H". There is Tanjong with "O", there is Tanjong with "U", it is indeed confusing. Mr Speaker, I will proceed to the issue raised by the Honourable Member for Penanti regarding the Mengkuang Dam. The State Government has taken note of the need to implement "user requirements" for state development projects in the future. The determination of "User Requirements" needs to be included in the preparation of Tender Documents at the early stage of the project to state the requirements of the customer and users for a project. However, for the Mengkuang Dam enlargement project, the implementation and monitoring of this project from the early stage until its completion is fully under the Ministry of Energy, Green Technology and Water (KeTTHA), which is now known as the Ministry of Water, Land and Natural Resources (KATS). For the information of the Honourable Member, the works for the Mengkuang Dam enlargement project began on 1 August 2011 and were scheduled for completion on 31 July 2016. However, the actual completion date of this project was 10 April 2017, more than a year late, with the Defect Liabilities Period which will end on 16 November 2019. Therefore, all defects that occur within this period, including problematic slopes, as raised by the Honourable Member for Penanti, maintenance and repair works within the area fall under the responsibility of the Ministry, which has taken note and is taking action to carry out repair works. In other words, the delay in handing over the Mengkuang Dam is not caused by the State Government. I believe, Honourable Member, everyone in this esteemed House also agrees that the State Government cannot accept the handover of an imperfect project. It would be very irresponsible if that were to happen. In this case, there are defects in the structure of the "Draw Off Tower" at the Mat Sulong Pump House which is included in the scope of the Mengkuang Dam project, and these defects will affect the pumping of water from the Sungai Kulim to the Mengkuang Dam. Therefore, until this problem is rectified, the State Government cannot accept it. However, discussions have been held between the State Government, PBA and the Ministry, and all the parties involved, and I am pleased to inform that the Ministry has agreed to meet all the conditions set, including the repair of the Mat Sulong Pump House and subsequently carry out "testing" and "hands on training" before handover to the State Government. Mr Speaker, I now move on to the proposal from the Honourable Member for Jawi that the State Government use technology... (interruption). Please, please.

Heng Lee LeeDAP · PHBerapitEN

Honourable EXCO Member, so, what is the expected timeframe for when the Mengkuang Dam can be opened to the public? This is an issue that is of great concern to the local people.

Zairil Khir JohariDAP · PHTanjong BungaEN

For now, let us first see how the repairs are carried out. They have been given a period of 60 days. So, I think in September we will start the training and also the testing. That should take about 30 days for the Mat Sulong Pump House, and we will make a decision at that time. I think... I do not want to give promises too early, because there have been many promises already. This project has already made many promises. Let us see, the project period itself, it was completed about 17 months after the original period. So, if I want to give a promise, it is rather difficult. But perhaps after the training is done and so on, the testing and commissioning, we can give more accurate information.

Mr Speaker. Oh, please.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

YB Tanjung Bunga, earlier I heard the explanation by the Honourable Member that the Defect Liabilities Period will end in 2018, 2019. This Defect Liabilities Period will begin when we give, start the CPC, this CPC means when the handover of the project to us takes place. Hearing the answer of the Honourable Member just now, the State Government rejects the handover and orders...

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, yes. The contract is between the contractor and the Federal Government. Not with the State Government. The handover that I meant is the handover from the Federal Government to the State Government. So, the Defect Liabilities Period, the liabilities, is between the contractor and the Federal Government. So, it indeed runs.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Yes, clarification. What I mean is that if we have still not received the project, that means the CPC should not be issued. The CPC is issued once we receive the project. And if we issue this CPC now, the Defect Liabilities Period will become short. And it will be a loss to the State Government.

Zairil Khir JohariDAP · PHTanjong BungaEN

No, I think the Honourable Member may not understand. He, he, his client is the Ministry. But the State Government does not want to take ownership. However, his client has already taken ownership. That means it is already completed. So, his DLP has already started….(interruption).

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Since the Honourable Member's earlier answer said that the State Government does not want to accept it, then what is the harm in one discussion with the Federal Government to review this Liabilities Period so that it does not cause losses to the State Government or the Federal Government and thereby involve the people's money. If in the period after this, defects occur again, defective [works] that require us to carry out repair works, repair works, it will cause losses to the government if the Defect Liabilities Period has ended. According to that CPC certificate, that is what I mean. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Understood, understood. The Honourable Member's proposal is to discuss with the Ministry to see whether the DLP can be extended again as a result of defects and so on. Okay, we can accept it, and we can further discuss it with the KATS Ministry (Ministry of Water, Land and Natural Resources). Okay, I will continue. Yes, Lee Khai Loon. Sorry. Machang Bubuk…(interruption).

Lee Khai LoonPKR · PHMachang BubukEN

Thank you. Just now, YB Berapit mentioned the opening of the Mengkuang Dam for public use. I have some doubts as to whether the Mengkuang Dam has been completed. Although it still has defects that need to be checked and rectified before we can take over, is there any structure that could cause the safety of the public to be compromised so that they cannot enter? If not, why can we not open it for the public to use? If the structure does not have any major problem that would jeopardise the safety of the public, can we open it for the public to use first, and then the negotiation process with the Federal Government and also with the contractor can proceed in the usual manner that has been established.

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, thank you, Honourable Member for Machang Bubuk. We will look into it, but in my view, the most important thing is safety. As the Honourable Member for Penanti raised, there have been several slope collapses in that area, and I think we need to ensure that slope repair work is carried out first. Even if we want to let people in. But however it is, we can discuss it later. I think I understand the Honourable Member's meaning and I will discuss it with that party. But I have to tell you again, it does not yet belong to the State Government. So in any case, right now it is the Ministry's property, okay. After the handover is made, then I think

the State Government can consider what the Honourable Member has proposed. Okay, is there anyone else with the Mengkuang Dam issue? If not, I'll give the floor to the Most Honourable Member.

Chow Kon YeowDAP · PHChief Minister · Padang KotaEN

Dato' Yang di-Pertua, actually the Honourable EXCO Member has summarised this very complex issue as briefly as possible. There is still a lot of information that we have not, explaining the reasons would take a long time. Actually, when can we test and commission the dam? It is only after it has been filled with water. Only then can testing and commissioning be carried out. And this will take several years to fully fill the expanded Mengkuang Dam. That is according to the agreement on that issue. Only then did the State Government take over the Mengkuang Dam for current operation, because of the issues raised by Penanti, which I think caused all parties to compromise to expedite the handover of the dam to PBA (Penang Water Supply Corporation), and the Ministry must be responsible for structural integrity. Because the Mengkuang Dam has not yet been filled and cannot prove the structural integrity of the Mengkuang Dam. But because it needed to be expedited, taken over by PBA, the Federal Government through the Ministry also gave me a promise to bear responsibility for the safety and structural integrity of the Mengkuang Dam, which should have been the case if the responsibility were handed to PBA, but we did not want to accept it because it was not yet the right time. So that is why there have been many issues relating to the Mengkuang Dam, and in the end I think there is already agreement among various parties to expedite the handover process, but we are still waiting for testing and commissioning after it has been filled with water.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Most Honourable Member, I think….(interruption).

Muhammad Yusoff Bin Mohd NoorUMNO · BNSungai Dua

Sikit penjelasan.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, please, Sungai Dua.

Muhammad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Is the work of installing pipes to convey water to Merbau Kudong part of the contract work? Because water from Mengkuang will be channelled to Merbau Kudong, to the plant, the PBA plant. Is it part of that? Or is it a separate, foreign contract work? Because the contractor's lawyers' firm has already started entering to carry out land acquisition and so on.

Zairil Khir JohariDAP · PHTanjong BungaEN

Yes, there will be one (1) pipe that will be installed to that area, as part of it. Actually it is a very big project if we count its scope, but what we discussed earlier was only the Mat Sulong Pump House and the Dam, the dam structure only. But it is indeed true that if we look at the full scope, it is very big and involves many more things. Okay, regarding the proposal from the Honourable Member for Jawi to use green technology to overcome flooding and the proposal to use electricity for pump houses around Jawi, which are said to still use diesel and solar panels. In this matter, the State Government will put forward the proposal to the Honourable Member for Jawi, and I would like to explain that the State Government, through the (JPS) Department of Irrigation and Drainage, places great emphasis on preserving the environment and is interested in using green technology to overcome flooding. Therefore, I will propose to the MMK Flood Mitigation Committee that it carry out a study on the implementation of green technologies such as rain gardens, green roofs, rainwater harvesting, permeable pavements and so on, in line with the strategy of transitioning from grey technology to green technology that is being pursued in various countries. In Penang, green technology using solar energy has already been applied in the Seberang Perai Selatan District for the operation of Tidal Control Gates at Kebun Baru, Pulau Burung and Gate D. Nevertheless, there have been cases of vandalism in that area, requiring frequent maintenance by JPS to ensure the main structural system operates properly. Meanwhile, regarding the pump house that is said to still use diesel, it is informed that in the SPS district there is only one pump house that uses diesel, namely the Bagan Buaya Pump House at Parit G2, Nibong Tebal. JPS has indeed planned long-term solutions to ensure the effectiveness of the pump house's operating system so that it is more efficient in the future, and the proposal to use electricity will be given consideration

by the State Government. As I explained that day, it is also subject to the development and progress of the surrounding areas. Regarding the proposal to place security guards to reduce vandalism, JPS has taken action by placing two (2) workers from the Nibong Tebal area and the Bukit Tambun area to operate the Bagan Buaya Pump House, which is located behind Taman Desa Jawi. The pump has been operating, and JPS has also carried out maintenance and increased the supply of diesel to improve the effectiveness of operations and avoid unforeseen problems.

Mr Speaker, the Honourable Member for Bagan Dalam…(interruption).

H’ng Mooi LyeDAP · PHJawiEN

Excuse me, excuse me, may I pass.

Zairil Khir JohariDAP · PHTanjong BungaEN

Oh, please, Jawi.

H’ng Mooi LyeDAP · PHJawiEN

Regarding the pump at Desa Jawi, I indeed thank you for sending JPS officers to that pump. Because this pump was built, I think, two (2) years ago but was not used at all. After I raised it in one (1) meeting with the YB EXCO, JPS carried out its duties, and another one (1) gate, said to be at Byram, which uses solar panels, is exactly what I proposed during my debate: we should build a guard post, a guard hut at the gate area at Byram, because every time at night when there is heavy rain, no one dares to go there. The reason given by JPS is that they are afraid, because if someone goes down, the whole area has no lights at all. So I request that, since we want to use solar panels, we could add solar panels to build a guard hut and pay wages to a security guard to look after that area, so that if there are security guards at the gate there, I think the vandalism cases that occur will be reduced, whereas we have to pay when equipment is stolen. When vandalism occurs and equipment is stolen, I think it is not cheap, and if we can hire a security guard, in the long and short term we will save money on replacing the stolen equipment.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, for the proposal of the Honourable Member for Jawi. That area is a plantation area. I think I have already written a letter to the Ministry of Agriculture to look at a more holistic solution. Not just to merely place a guard hut and so on, but perhaps it can also be upgraded. What about the machinery and also the flood mitigation equipment there? If we can create a more comprehensive solution for the irrigation issues in that area, plantations that often flood, I think that would be better. So if we can get an allocation, I think a solution that can include placing a hut and so on within its scope. But if it is better, we can directly connect the electricity supply. I think that is the best, but for now that is indeed the problem as the Honourable Member said. Theft occurs, vandalism and so on. People break in, and at night people are also afraid to go to that place because it is very remote. Mr Speaker, the Honourable Member for Bagan Dalam raised a question regarding allocations provided by the State Government or the Federal Government for dredging tributaries or drains in flood-risk areas. To answer the question raised, it is informed that in 2018 the State Government received an allocation from the Federal Government amounting to RM4.8 million to carry out deepening work and repairing riverbanks in Penang. A total of 31 works were carried out using this allocation, and at the same time, the State Government also provided an allocation amounting to RM4.35 million to carry out 35 related works. However, it is indeed acknowledged that this amount is far from sufficient, because we have many rivers in Penang and dredging work is not cheap. But if there is an urgent need, I suggest the Honourable Member submit a proposal to the MMK Flood Mitigation Committee for consideration of the use of drainage contribution allocations. Yes, Honourable Member.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you, Honourable Member for Tanjung Bunga. What I meant is not only in my own area but across Seberang Perai. What I have seen, in my area, there is still a dispute among JKR (Public Works Department), MPSP (Seberang Perai Municipal Council), and JPS as to who should build a drain. The drain is not even long, but up to today JKR says it is JPS's responsibility, JPS says it is MPSP's, and it is still ongoing. So I do not know when they will resolve it, I hope it does not rain heavily until then. Secondly, the tributary and drain I meant is the one at Jalan Permatang Tok Kangar, which is at Bukit Tengah from Auto City going into Taman Cendana and so on. I saw that river had been dredged a few weeks ago. It is really bad, every time it rains for one hour, the roads are all flooded, so that needs to be done frequently, that is my comment. Thank you.

Lee Chun KitDAP · PHPulau TikusEN

Mr Speaker, may I interject. Okay, thank you, Honourable Member for Tanjung Bunga. I also just now, when we are on the subject of flooding…(with permission), said that some people told me there are materials that can be used for building roads and sidewalks and everything that will absorb more water. Can we conduct a study on such materials for our future? So that, you know, because I think at this time flooding is becoming more frequent because of climate change, I mean the weather is becoming more extreme at this time. Therefore, we should look for solutions. Some may be too expensive, but we can also look for other alternatives. Okay, thank you.

Gooi Hsiao-LeungPKR · PHBukit TengahEN

Honourable Member, I was interested in the earlier question about the allocation that had been requested from the Federal Government for river dredging work and so on to overcome the flood problem. Previously I had also asked a question, I had written one (1) question. Among it was, what action was taken between 2008 and 2018? The State Government's detailed plan for the next five (5) years to rehabilitate and protect the rivers. Rivers and connecting water routes, especially Sungai Juru, Sungai Jawi and Sungai Junjung, from pollution and also the discharge of factory waste. I think this is very important because in my area there are two very important rivers that pass through my area from the sea to Kuala Juru, going all the way to Taman Seri Rambai, and along these rivers many people depend on them, such as fishermen at Kuala Juru who run, who run the cockle industry and many more fishermen who live in those river areas. And the answer already given by the Honourable Member was also very detailed, there were more than 13, 15 proposals given for the short term. But what interested me was the plan for the next five years. Where it is stated here that the government intends to implement three (3) Flood Mitigation Plans (RTB), namely the RTB Sungai Junjung, RTB Lembangan Sungai Juru and also the RTB Lembangan Sungai Jawi, which, in addition to achieving the goal of overcoming the flood risk mentioned, the RTB can also restore polluted river flow through the scope of work of dredging and deepening those rivers, which I think is very important. My question and the explanation are: what is the scope of these three projects, the construction cost or the price for these three (3) projects, whether the State Government has applied to the Federal Government for these three (3) projects, and the expected completion time of these projects, if the Honourable Member has the facts, the facts for

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you to all the Honourable Members for raising the issues. Actually, the main issue is that the most significant constraint is money. The constraint is cost, and no matter how much we want to do something, we must discuss the issue of dredging, for example. Among the problems faced at Sungai Juru, for instance, Sungai Juru is one (1) very important river in SPT. If we want to carry out dredging at its estuary, for example, it costs millions and it is only a short-term solution. After two (2) or three (3) years, surtation will occur again, and it will once again become a problem that requires dredging and so on. So I feel that a long-term solution is what we need, but all of that requires a very large expenditure. Earlier, the Honourable Member mentioned several listed RTB projects. All of those are federal projects, as the Honourable Member is aware, and if you want to know, their cost is actually hundreds of millions. Sungai Junjung alone is RM60 million. That is the actual cost, and how large it is when we want to carry out flood mitigation projects. For the Sungai Pinang catchment, let me give an example. This is often discussed in the State Legislative Assembly, outside it, and it is one of the main causes of flooding in the island area, particularly in the North-East District.

If we want a total solution, a comprehensive solution for the Sungai Pinang catchment, whose catchment area is 50 km square, we would need RM650 million. This does not include the land acquisition cost of RM654 million, Honourable Member, just for the solution, for construction. So I think the Honourable Member can imagine how cost intensive it is, how much allocation is needed, and that it cannot be done overnight either. When we request the cost we hope for, once the allocation is approved, it can be done on a rolling basis and we can do it phase by phase. For example, in SPT we carried out the Parit 4 and Parit 5 Flood Mitigation Projects, all done in phases. In Bukit Mertajam, for instance, Machang Bubuk, there is also, later I will answer the question about the Alma Retention Pond. That is actually phase 3, where the first phase was previously carried out as a pumping house in Permatang Tinggi and also a by-pass in Parit, Parit 5..Parit 4, yes, and then phase 3 is the Alma Retention Pond, and there are still phase 4 and phase 5 to follow. So, all Honourable Members, I understand that flooding is an issue that all of us have to face, perhaps except for the Honourable Member for Pulau Tikus, who has no flooding in his area. Just a little. Yes, Bagan Jermal and also at the border of Tanjung Tokong. But apart from that, not much, apart from, what is it, Pulau Tikus, I think all of us face flood-prone areas that are difficult to deal with. Nevertheless, I would like to ask for your patience too, Honourable Members. We want to solve this. If the State Government can solve it, we will certainly do it. However, it requires not only cost, but also time. Because sometimes I see that Honourable Members, there is flooding and then they want the solution to be carried out the next day. I think the process is actually more complicated, very complicated and not so straightforward. We need prior studies, we need to appoint consultants first, then do the detailed design, then open tenders, appoint contractors, yes, all of which require time. And I hope we can have patience together as one (1) State Government with all Honourable Members, including from the opposition. Insya Allah, in the coming years, with the cooperation of the Federal Government, I am confident we can achieve much improvement in this flood mitigation issue.

Mr Speaker, I would now like to turn to Honourable Machang Bubuk, who argued about the flood mitigation project in the city of Bangkok, Thailand, namely Centenary Park at Chulalongkorn University. The 11-acre open space has been turned into a water detention area with the construction of an underground tank capable of holding approximately 3,785 cubic metres of rainwater, which is one and a half times the volume of an Olympic-sized swimming pool. This project, Mr Speaker, is really interesting, not only in terms of its function of mitigating flooding but also in terms of aesthetics and recreation, because the park can also be used by the public when it is not raining. In fact, I visited Bangkok recently and received a briefing on flood mitigation projects in the city of Bangkok, received the briefing from the Bangkok Metropolitan Administration, namely the City Council, and included in the briefing was the use of underground water detention tanks, underground detention tanks. In Thai, these underground tanks are called "kaem ling", "kaem ling". The meaning of "kaem ling" is monkey cheek. And I asked why it is named monkey cheek? Then he explained, saying that when a monkey eats a banana, and other monkeys come to snatch its banana, it will stuff all the bananas into its mouth until its cheeks swell. Then it will go to another place and chew slowly. So that is the analogy used by the Thai authorities to explain to me. In fact, when it rains, the tank will be "stuffed" with as much water as possible, and then it will be "swallowed" or released slowly into the river. So that is the analogy used. And this concept is actually not a new concept, and it has already been implemented in many countries. The only issue is, going back to the cost of building an underground tank, it requires a very high cost. I also asked the Bangkok Metropolitan Administration how much cost was incurred for what is needed to build that "kaem ling". And they informed me that for that project the cost is more than RM300 million, Honourable Member. So, to build it in the Alma area, I think perhaps not this time, but I have taken note of this proposal and we will study its feasibility as a condition for future developments. Perhaps we can make it a condition for developers if there is a town shade, if there is development or large-scale development. But for the Alma area, I think the cost constraint, because the ceiling that has already been approved is insufficient, however, I am pleased to inform you that the State Government has already approved an allocation of RM9.6 million for the implementation of the Alma Retention Pond project, although it will not take the form of a "kaem ling". Nevertheless, I think it will perform its work as a detention pond, and the option we will choose is a solution that is able to hold rainwater with an ARI (average recurrence interval) of 50 years, which is expected to reduce run-off water by 50% from the downstream area, hilir.

Mr Speaker, turning to the issue raised by Honourable Batu Uban regarding drains that need to be maintained and cleaned regularly, the drainage system that is said to be unsystematic, and requesting that allocations for drainage system maintenance be carried out in Batu Uban. To answer the issues and questions raised, the State Government through MBPP (Penang Island City Council) has implemented road and concrete public drain cleaning services in the area of the DUN Batu Uban, covering four (4) areas with a workforce of 138 persons. I do not think I will give the breakdown here, since the Honourable Member for Batu Uban is not in the House, but apart from that, task force cleaning is also carried out every Friday, particularly in major drains and problematic drains, as a "value added" service. In addition, MBPP monitors the cleanliness of the area by involving supervisors and foremen, four (4) persons. Monitoring is carried out based on the following administrative practices: (i). Conducting area patrols based on the work schedule; (ii). Recording daily monitoring based on the various scopes of cleaning services and the areas visited; (iii). Uploading information on the condition of an area and the actions taken through a "WhatsApp group"; and (iv). Taking action to issue notices and/or fines to any contractor who does not carry out the work satisfactorily.

Mr Speaker, the Honourable Member for Bertam raised the matter of infrastructure development in Bertam, particularly the construction of an unsystematic drainage system that causes flash flood incidents. The Honourable Member also raised the absence of careful planning in the construction of drains in Kampung Kovil and Kampung Setol, and requested that the implementation of the drainage plan be expedited. For the information of the Honourable Member, the flash flooding that occurred in Bertam was caused by several factors, and the State Government, through MPSP (Seberang Perai Municipal Council), has directed the developers and also the Consulting Engineers responsible to take corrective action on the flooding problem that occurred in the Bertam development area. Following that, after the drain upgrading work was carried out, MPSP has no longer received flood complaints originating from the unsystematic drainage system. At the same time, MPSP has also taken action to clear leaves and rubbish that were blocking drains and trash traps, to the extent that they were disrupting the flow of water in the drainage system. Regarding the absence of planning in the construction of drains in Kampung Kovil and Kampung Setol, I would like to explain that these areas are traditional villages which, in terms of topography, are low-lying, or at a low level, and indeed there is no organised drainage system built as in the new housing areas implemented by developers. Nevertheless, the proposal that a drainage plan be implemented in village areas of this kind will be studied for implementation and discussed further in the Flood Mitigation Committee of the Government Executive Council (MMK), which is chaired by the Honourable Member for Bertam himself.

Turning to the Honourable Member for Sungai Dua, who requested that the State Government prepare and table a Flood Mitigation Master Plan, as well as table the expenditure status of Flood Mitigation Plan projects. I am pleased to explain that the Drainage and Irrigation Department (JPS) has carried out and is carrying out an Environmentally Friendly Drainage Master Plan Study for each district, which can be used as a reference for the development of the drainage system. The status of the studies is as follows: (i). For the Central Seberang Perai District study, it was fully completed in April 2016; (ii). For South Seberang Perai, it was fully completed in October 2017; (iii). For North Seberang Perai, it is still in the implementation process and is expected to be completed in October 2018; (iv). For the North-East District, the report has been prepared and will be re-presented to all the ADUNs of the areas in the near future; and (v). The South-West District was fully completed in November 2013, and the appointment of consultants for a re-review will be made in 2019. As for the requests for the State Government to table the performance status of flood mitigation projects, it is informed that there are five (5) high-impact projects currently under construction. Among the projects are the following: the Sungai Permatang Rawa Flood Mitigation Project at Kampong Tanah Liat, Taman Guru, Padang Lalang and Kampung Permatang Rawa, Central Seberang Perai District, amounting to RM30.31 million; the Parit 4 Flood Mitigation Project at Bukit Tengah, Taman Desa Damai, Central Seberang Perai District, amounting to RM16.97 million; the Parit 5 Flood Mitigation Project at Taman Mangga and Jalan Juru, Seberang Perai Tengah also amounting to RM14.6 million; the Mak Mandin Area Flood Mitigation Project, North Seberang Perai District, amounting to RM42.4 million; and the Sungai Nipah Flood Mitigation Project at Taman Iping, South-West District, amounting to RM15.27 million. For the Bayan Baru Flood Mitigation Project, the Detailed Design Project for the construction of the Alma Retention Pond as mentioned earlier, Central Seberang Perai District, as well as the Detailed Design Project for the upgrading of the Sungai Tiram drainage system at Kampung Naran, Bayan Lepas, all of these are still in the preparation of conceptual reports and detailed designs. The estimated costs for these three (3) projects have not yet been finalised ...(interruption).

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Request for clarification. I would like to add a little, if possible for next year, flood mitigation plans also need to be included for the North Seberang Perai area. There are still rivers that have not been deepened, there are still drains whose drainage is not yet completed, if possible please include the list for SPU as well, the whole of SPU should be included.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Sungai Dua. We take note, and we will look into the implementation of flood mitigation projects, particularly in the Seberang Perai Utara District, which is in great need of them. Okay, Mr Speaker, regarding the proposal raised by the Honourable Pulau Betong, who is not present today, on the establishment of a task force, we are informed that a platform already exists in every district that is responsible for detecting floods, namely through a sub-committee under the District Disaster Committee. This District Disaster Committee is chaired by the District and Land Officer in each district and drives efforts to tackle flood problems in areas that have already been identified. Therefore, the Honourable Member may use this platform to voice the need for action in critical areas. Mr Speaker, the provision of telecommunications infrastructure in the State of Penang is now much better compared with 10 years ago. This is the result of the efforts and initiatives of the State Government, with the cooperation of various parties, whether the private sector or the telecommunications industry, that have been willing to invest in the State of Penang. This is because the State Government of Penang practises the 3M and 1S policy in the implementation of telecommunications infrastructure. The 3M referred to are, first, Maju (Progressive): Penang is a progressive state with high commercial value in terms of the volume of demand and subscription. This has caused service providers to compete to provide better infrastructure and services on a commercial basis. Moreover, the cost of investing in telecommunications infrastructure in the State of Penang is lower than in other states, based on the processing fees, permits and renewal of permits for telecommunications structures set by the Local Authority, at very affordable rates. The second M is Mesra (Friendly). The State Government's policy is investor-friendly and practises a no-monopoly policy or the granting of exclusive rights to any party in providing telecommunications infrastructure and services in the State of Penang. This policy can attract more investors or service providers to come to the State of Penang and also encourage healthy competition. The third M is Mudah (Easy). The process of construction and renewal of permits in the State of Penang has also been simplified through the Procedures and Guidelines for the Construction of Telecommunication Towers and Transmitter Structures of the State of Penang, which came into force on 1 June 2015. Applications for Building Plans may be made directly without having to go through the Planning Permission process, and this has in fact further improved the process. Thus, the permit renewal process has also been simplified, requiring only the certification of a Professional Engineer and not the Security Audit Report from a third party who may not be certified, as practised in other states. Earlier, 3M, 1S was Smart. The State Government's initiative to develop an International-standard Smart City is an initiative of the State Government to encourage and increase the use of ICT and technology, especially those involving telecommunications and multimedia. The increased demand for the use of broadband will in turn also increase the provision of infrastructure. Mr Speaker, based on the latest data from MBPP and MPSP as at the end of July 2018, there are 1,070 valid telecommunications structures throughout the State of Penang, namely 504 in the Seberang Perai area and 566 in the Island area. Meanwhile, the number of invalid telecommunications structures is 122, namely 98 in the Seberang Perai area and 24 in the island area. Enforcement actions are now being carried out by both Local Authorities in stages through the Service of Notice of Unauthorised Construction as well as the Notice to Vacate the Building, and demolition operations of structures as needed, in the spirit of Moratorium Programme Phase 1 and Phase 2, which ended on 31 December 2016, being an amnesty programme. Also implemented is camouflage, or disguising of telecommunications structures in heritage areas, which is being extended throughout George Town in stages by telecommunications companies and monitored by the Heritage Conservation Department and the Building Control Department of MBPP. Moreover, as an initiative to monitor telecommunications structures and facilitate the management of telecommunications structure permits in the State of Penang, the State Government, with the cooperation of the Malaysian Communications and Multimedia Commission (SKMM), is now endeavouring to integrate the existing system used at MBPP and MPSP with the Communication Infrastructure Permit Management system, or CIPM, developed by SKMM for use throughout Malaysia. Mr Speaker, the implementation of Fiber Forward Penang (FFP), approved by the State Executive Council (MMK) on 27 May 2015, encourages the installation of fibre optics replacing copper networks by telecommunications service providers, and has succeeded in increasing the installation of fibre optics in our state so that the people of Penang can enjoy high-speed internet facilities. Based on the latest data on fibre installation and data digitally mapped by PEGIS, 50% of the areas throughout the State of Penang are now covered by fibre routes totalling 3,226 km, with 600 km of them on the state's main roads. This means that 80% of the main roads in Penang already have fibre coverage. Moreover, the State Government is now proposing to implement a Telecommunication Common Ducting system specifically for the installation of fibre optics in new development areas (green field). Batu Kawan has been selected as the pilot project. Mr Speaker, the wireless broadband facility provided by the State Government of Penang through the Penang Free WiFi (PFW) programme began in 2009 in every state constituency (KADUN), with the installation of 1,560 Access Points, or APs, throughout the State of Penang, each capable of accommodating 30 users at one time per AP. In line with the advancement of internet and telecommunications access, the concept of implementing Penang Free Wifi through joint branding or co-branding with any telecommunications company was approved by the State Government in April 2017, together with its implementation SOP. Therefore, the State Government warmly welcomes any telecommunications service provider that is interested in continuing this facility in the future. In response to the comments of the Honourable Batu Uban, who stated that the quality of the Penang Free Wifi service in the Batu Uban KADUN is poor, the State Government is now in the process of improving and upgrading the Penang Free Wifi service throughout the State of Penang, welcoming any company. In fact, we will open an RFP to invite any telecommunications company that is interested in continuing Penang Free Wifi with more advanced technology, and several major companies have already shown interest, and I believe the Honourable Member will be informed in the near future when we are able to make an announcement. Deputy Speaker, as a closing... (interruption).

Kumaresan A/L AramugamPKR · PHBatu UbanEN

Request for clarification. Thank you, Dato' Speaker. Thank you, Honourable Tanjung Bunga. I welcome the Penang Free Wifi and also the steps taken to improve the speed of this internet system. However, what I would request is that in future, this free wifi service be extended further to public facilities such as libraries, public parks and so on. Thank you.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Batu Uban... there are two of you, please, please, ladies first.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Thank you. I would ask the Honourable Tanjung Bunga not to neglect the Seberang Perai Utara District either, in receiving the same coverage. Thank you.

Ong Ah TeongDAP · PHBatu LancangEN

Honourable, Mr Speaker, Honourable Tanjung Bungah, before closing I would like to interject briefly, because earlier I was waiting for the Honourable EXCO for Tourism, who was late. Before closing, I want to be quick. I waited for all the answers first, but I was not called. In my debate I raised issues concerning the PWD SOP, concerning the specifications used for roads, which were not addressed, and concerning the centre divider... (with permission), which has been given to the PWD to resurface directly with cement, and this will cause flooding in those areas because it does not absorb downwards, it goes under the floor. Another matter I raised, and in my view it is very serious, is the specifications used by the PWD for our tar roads and the technical methods used to resurface those roads without milling... (with permission), meaning without digging up each time the layers are resurfaced. I have only calculated from the time I was born until now, 50 years. I say that every five (5) years, 6 cm in height has been resurfaced, so over 50 years, that is 10 times 6 cm, which makes two (2) feet in height of resurfacing that has been done in areas across the whole island. So, that means these two (2) feet in height, I obtained from Pan Malaysia, we have 2,636 hectares of road area across the whole island, and based on that calculation, it means the rainwater that cannot be held by our roads has exceeded two (2) feet, approximately 15,816 million litres. That is one reason that causes flooding in Penang as well. I believe that is a factor that the PWD or MBPP needs to consider, how to overcome the possibility that in 50 years' time we must be careful, must dig before tarring and so on. That is all.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you, Honourable Batu Lanchang. I will take note and also discuss with the PWD regarding the SOP and specifications of the PWD. But for the Honourable Member's information, the PWD SOP does require milling and paving, so milling of 50 millimetres will indeed be carried out... (interruption).

Ong Ah TeongDAP · PHBatu LancangEN

Sorry, I interject briefly. Most of those places have no milling and paving, none at all. One example is the accident at Farlim towards Thean Teik, where an accident occurred because of the high resurfacing near the edge of the pavement, which became large. The motorcycle skidded and went near the cabin, and a fatal accident occurred. There is certainly no evidence, there is absolutely no milling and paving there. They will just raise it at the edges of the pavement, we call that a curve. We see that after milling they will raise it so that it appears to be the same height, but in fact we are only using the technique of resurfacing.

Zairil Khir JohariDAP · PHTanjong BungaEN

Thank you. I take this seriously, and I think that if the SOP is not followed, it is an offence that should not happen, or non-compliance with the SOP. I will discuss this with the PWD to ensure that whenever work is done, we must follow the SOP that has been determined. As for the Honourable Permatang Berangan and also Batu Uban, both of them have raised the matter of the Penang Free Wifi coverage areas. I think we will ensure that every state constituency (KADUN) receives this facility, and I think the areas we focus on are areas where people gather and public areas.

Satees A/L MuniandyDAP · PHBagan DalamEN

Request for the floor. Since we are talking about communication, with permission, regarding wifi connection, I have received complaints from residents of my area. Although Butterworth is an area that can be said to be developed and dense in the Seberang Perai area, there are still places without Unifi connection. The main road, namely Jalan Siram, which connects Jalan Raja Uda and Jalan Sungai Nyior, the main road has no Unifi connection. When I asked a contractor, what he was told was that the PWD was the obstacle, because he had applied to dig up the road and resurface it. Sometimes that application takes up to a maximum of six (6) months, previously it was within one month. This situation did not happen in SPT and SPS, only in SPU, three (3) to six (6) months. This needs to be reviewed. That is my view.

Zairil Khir JohariDAP · PHTanjong BungaEN

I will look into this matter. However, in most cases, the delay or lack of Unifi coverage is due to TM itself, not to mention SPU or Jalan Siram. In Pulau Tikus too there are many places, including the Penang Institute, that are not covered by Unifi. This is actually TM itself, because when it wants to enter an area, it will calculate in terms of commercial value. So if it wants to enter, it will make sure it can recover its investment. Sometimes we need to ask TM and not the contractor, because the contractor may not have the full facts. So thank you, but I will look into it... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

But there is a complaint that it will cut the road for the application. (interruption). There are also some from developers too... (interruption).

Zairil Khir JohariDAP · PHTanjong BungaEN

Okay, we can look into it. Mr Speaker, that concludes my lengthy speech. It has been the aspiration that the State of Penang develops and progresses with efficient and sustainable infrastructure for the comfort of all the people of Penang. Therefore the State Government constantly strives diligently through various platforms to ensure that the State of Penang has the best infrastructure in line with the agenda of transforming this state into an International-standard Smart State and providing a sustainable life for the people. To that end, the State Government welcomes the cooperation of all parties, including the private sector and also the Federal Government, to realise any infrastructure project plans. Hopefully, with close cooperation among all parties, the State of Penag will continue to move forward and bring prosperity to all the people of Penang. Thank you, Mr Speaker.

Deputy Speaker of the HouseEN

Thank you, Honourable Tanjung Bungah. The floor is given to the Honourable State Assemblyman for Seberang Jaya.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Bismillahirahmanirahim, Assalamualaikum w.b.t., salam sejahtera and salam reformasi. Thank you, Honourable Deputy Speaker, Members of this House whom I respect. Let me begin my winding-up session by recording my pride in being a citizen of Malaysia and also a citizen of Penang, especially after 9 May 2018. I am proud today because the people of Malaysia have shown the maturity and courage to topple a kleptocratic regime that had been in power for more than 60 years. What is even more gratifying is that this change was made with nothing more than a pen and a sheet of paper, peacefully and through the democratic channel of general elections. Surely the Independence Day celebrations this year will be sweeter and more meaningful for us all, because Malaysia has now become a model and an inspiration to the struggle for democracy and freedom across the world. On this occasion, I also wish to express my highest appreciation to the people of Penang, especially the voters in Seberang Jaya and Permatang Pauh, for once again entrusting me with the mandate to represent their voice in this State. In the past, we in this State, though elected by the people, were treated as stepchildren by the previous Federal Government. Times have now changed, and with that awareness we must become a government that is inclusive, caring towards the people and, more importantly, a government that upholds the principles of justice, freedom and democracy. On this occasion I also wish to record my appreciation and heartfelt thanks to the State and Federal Government agencies, non-governmental organisations and the people of this State who have worked tirelessly, without counting their fatigue, day and night, in efforts to develop this State of Penang. With the new leadership at the Federal level, I am confident and believe that all agencies and government machinery will move as one team to protect the interests of the people of this State. For the information of the House, I wish to report with pleasure that before the 100-day period ended, the three ministers responsible for my portfolio, namely the Minister of Agriculture, the Minister of Health and the Minister of Rural Development, held a meeting with all the State EXCOs, not only from the Pakatan Harapan states but also from the states led by the Opposition. This is a new practice that I have never seen before in the previous term. This platform will surely bring many benefits to us at the State Government level, and this is proof of the commitment of the Pakatan Harapan Government to bring reform and uphold the true principles of the Federation. The State Government is committed to continuing the policies of Efficiency, Accountability and Transparency, and these elements are the pillars of the State Government's administration, which has received extraordinary support and backing from the people in the previous general election. Honourable Mr Speaker and Honourable Members, the agriculture sector is an important sector in this State, divided into three main components, namely agriculture, livestock farming and fisheries. For the information of Honourable Members, the agriculture sector contributed RM1.54 billion to the State's GDP in 2017, whereas in 2016 this sector contributed only RM1.5 billion. If we examine closely, there was an increase of RM47 million in the contribution of the agriculture sector. For 2017, the agriculture sector in this State produced a total of 113,741.71 metric tonnes of agricultural products covering floriculture, herbs and spices, paddy, vegetables, fruit crops, industrial crops and plantation crops. As for the fisheries industry, this sector recorded very positive growth, namely that in 2017 the value of the output contributed by this sector was RM819 million compared with only RM679 million in 2017, an increase of RM140 million. As for livestock production, for 2017 it was RM854.02 million, an increase of RM6.95 million compared with 2016. The Agro-Based Industry and Agriculture Sector has indeed been a priority of the State Government. As evidence, the State Government has planned and implemented various initiatives to empower this industry in the State of Penang. For example, the State Government organised the Seberang Perai Fiesta 2017, namely the Agro-Based Industry and Food Carnival, held at the Seberang Jaya Expo Site from 24 to 27 August last year. The organisation of this programme succeeded in attracting a total of 34,456 visitors over the four (4) days it was held. The State Government's initiative in organising large-scale programmes such as this aims to promote the agro-based, fisheries and livestock industries as major components in the State of Penang. In addition, through the organisation of this programme, the State Government of Penang clearly shows its appreciation and recognition of the contributions of farmers, livestock breeders and fishermen to the development of this State. Insya-Allah, this programme will be continued this year, and the duration will be extended from four (4) to five (5) days, starting from 26 September to 31 September 2018. On this occasion, I also call on all Honourable Members to help promote the largest annual event specifically for the agro-based industry sector in the State of Penang. Besides that, the State Government will also be participating in the Malaysia Agriculture, Horticulture and Agrotourism Show (MAHA) 2018, which will be held at MAEPS Serdang this year. Through participation in programmes of this kind, products of agro-based entrepreneurs in this State will be able to expand their market network further and strengthen the brand of Penang products. With the change of leadership in GE14, Federal agencies now have no obstacles in forming cooperation and strengthening local brands. With the efforts carried out by the State Government to market Penang's products even to overseas countries. I myself will be attending a working visit arranged by FAMA this weekend in Singapore to monitor and also promote Penang's products there. This is part of the commitment of the State Government and the Federal Government, which is attentive to the need to develop the Agro-Based Industry among the entrepreneurs of this State. Apart from that, the State Government, through the Department of Agriculture, has also organised several series of promotional programmes and direct sales for AIB entrepreneurs. Among the programmes implemented were during the Penang International Halal Expo 2018 at SPICE, a promotional programme at PKNS Mall, Shah Alam, the Seberang Jaya Maju Bersama programme at Mydin Mall, Bukit Mertajam, and also a promotional programme at Berjaya Megamall, Kuantan, recently. All these programmes succeeded in recording sales totalling RM178,000.00 from promotional programmes of this kind. Through these promotional programmes, the income of AIB entrepreneurs will be increased and the brands of local entrepreneurs will be upheld so that they become known to the public. The State Government is also aware of the popularity of durian in the State of Penang. Recently, a programme called Penang Durian Fest 2018 was organised at Mydin Mall Bukit Mertajam on 27 and 28 July 2018. For the information of YB. Mr Speaker and Honourable Members, this programme was officiated by the Deputy Minister of Agriculture and Agro-Based Industry, namely the Honourable Member of Parliament for Bayan Baru, Saudara Sim Tze Tzin, on 27 July 2018. He also requested that this programme be continued in the future and proposed that a durian map be created to further enhance agrotourism in the durian industry in the State of Penang. Honourable Members, Mr Speaker, for human capital development and towards producing young agricultural and AIB entrepreneurs as successors, since 2015 until August 2018, the State Government has allocated a total of RM750,000.00 for the Young Farmer Entrepreneur Programme, now known as the Tabung Usahawan Tani (Farmer Entrepreneur Fund). Listening to the applications and needs raised by these entrepreneurs, the State Government has decided to also open opportunities to AIB entrepreneurs aged above 40 years and not exceeding 60 years to participate in the Tabung Usahawan Tani. For applicants below 40 years of age, an interest-free loan of RM6,000.00 is provided. As for those aged 40 to 60 years, a micro-credit contribution of RM5,000 is provided for these entrepreneurs. All these microcredit grants are financed without any payment of interest, zero interest..(with permission). In response to the question raised, the matter raised by the Honourable Member for Penanti and also the Honourable Member for Sungai Dua regarding effective action that must be taken by the State Government to prevent the occurrence of paddy land filling activities, especially in the District of North Seberang Perai. For the information of the Honourable Member, based on the paddy area whitening programme implemented by IADA until March 2018, the actual paddy land area in this State is 12,105 hectares, of which in SPU alone the area is 8,814 hectares, SPT 2,398 hectares, SPS 1,267 hectares and DBD 298 hectares. The SPU district is the most extensive and active paddy cultivation area in this State, with 4,048 farmers, and it contributes 67% of the total paddy area in this State. The Department of Agriculture and IADA consistently do not support any application for re-gazettement or application to change the land conditions of paddy granary land for other purposes. The State Government also intends for paddy granary land to be preserved and for the level of self-sufficiency or self sufficiency level to reach 85%. As the Honourable Member is aware, the Local Authority has taken enforcement actions such as issuing Stop-Work Notices under Section 70A, Street, Drainage and Building Act 1974, and taking court action under Section 70A Street, Drainage and Building Act 1974, which provides that upon conviction a fine of RM50,000.00 or imprisonment of not more than five (5) years or both may be imposed. For offences that continue after conviction, the fine may increase by RM500.00 for each day the offence continues, and enforcement action is taken against filling work without the Council's permission under Section 27 or 28 of the Town and Country Planning Act 1976. Apart from that, the State Government, through the Department of Agriculture, has also established the Briged Tani, which aims to carry out the tasks of planting paddy, fertilising, spraying pesticides, weeding, and monitoring the outbreak of diseases and also pests. The Briged Tani consists of young people who are trained and guided to carry out the above tasks. The Briged Tani is also a place where many young farmers who are experts in the paddy cultivation industry are nurtured. There are a total of 15 groups in this brigade, namely four (4) in SPT, seven (7) in SPU, three (3) in SPS and one (1) in DBD. Through the establishment of this Briged Tani, I also hope it will act as the eyes and ears of the State Government and the relevant departments in channelling information, especially on the activities of illegally filling paddy land. Regarding the proposal by the Honourable Member for Sungai Dua that the allocation for the agriculture sector be increased. The State Government is always committed to the development of the agriculture sector as this matter also affects food security. However, this allocation is based on the government's capacity, since allocations for other sectors are also needed. Nevertheless, with the existence of the same government at the State and Federal levels, I believe we will be able to achieve synergy in this matter. I also raised issues of this sector at the ministry level during my first courtesy call on the Honourable Minister of Agro-Based Industry on 3 July 2018, and during the Meeting of Agriculture EXCOs with the Minister of Agriculture on 12 July 2018 recently. Honourable Members, in 2018, the State Government allocated RM2.96 million for the purpose of developing the livestock industry in this State. Meanwhile, the Federal Government allocated only RM45,000.00 for the same purpose. In 2017, the State Government financed the procurement of Ayam Piru chicks from the United Kingdom, involving a cost of RM49,500.00, and Dairy Male Goats from Australia, involving a cost of almost RM100,000.00. The main objective is for us to develop two industries, namely the Ayam Piru Farming Industry and the Goat Milk Dairy Industry. The State Government, through the Department of Veterinary Services, is currently procuring Local Male Goat and Sheep Stock. For the purpose of procuring this stock, the State Government has allocated a total of RM100,000.00 to ensure the healthy development of the livestock industry in this State. These efforts are being made to ensure that the livestock sector in this State continues to grow in line with the development of other industries. I would like to invite Honourable Members in this House, and anyone who is interested in seeing the Ayam Piru closed house in person, to come to the Bukit Tengah Veterinary Department and see for themselves how these Ayam Piru livestock are raised. For the information of Deputy Speaker and Honourable Members, the State Government has also passed the Pig Farming Enactment in 2016. The State Government is now in the final process of reviewing the Pig Farming Licensing Regulations. However, the State Government is also preparing SOPs for licensing, compounding and farm closure for the implementation of the enactment. The State Government will also hold another series of meetings with livestock breeders in September this month. In the meantime, the State Government is still issuing notices and monitoring all pig farms for improvement and upgrading. This is the State Government's commitment to ensure that this industry becomes not only a clean and safe industry, but most importantly one that does not pollute or disturb the lives of the people of the State of Penang. Honourable Members, starting from 2017, the State Government introduced a method of giving assistance to fishermen in the form of vouchers worth RM400.00. In 2017, a total of 2,098 coastal fishermen benefited from this programme, involving a cost of RM838,842.00. In 2018, a total of 2,208 coastal fishermen received this benefit, with expenditure totalling RM883,156.00. Apart from that, the State Government, through the Department of Fisheries, also implemented programmes such as the Touch Point Programme for 120 fishermen at a cost of RM75,000.00.00, skills programmes such as the Fishery Product Processing Course, on-site demonstrations of outboard engines and electronic equipment, and on-site demonstrations of fishery product processing. The State Government, through the Malaysian Fisheries Development Authority, also provided living allowances to fishermen totalling RM5.6 million and fishing incentives totalling RM454,000.00. The aim of the State Government is not only to help the fishermen group in terms of finance or equipment, but also to place emphasis on developing the human capital of the fishermen group so that they possess dynamic and diverse skills. "Fishermen is not just a job, it is a profession". The State Government's great aspiration is to ensure that the fishermen group is always protected, especially in the era of the Pakatan Harapan Government. To increase the contribution of the aquaculture industry in this State, the State Government is also in the process of implementing the Aquaculture Industrial Zone in Penaga, namely ZIA Penaga. For the information of Honourable Members, this ZIA Penaga is being developed on land measuring 479 acres in line with the Penang State Structure Plan 2020. The application for re-gazettement of the area from mangrove swamp forest zone to agricultural zone was approved in 2014. In response to the question from the Honourable Member for Bagan Dalam, regarding the issue of conservation of mangrove swamps in the ZIA Penaga area, the State Government pays very close attention to the protection of mangrove swamp forests. As evidence, the State Government has produced the first aquaculture guidelines in Malaysia, involving all relevant agencies. These guidelines were produced after taking into account the input and views of all departments, the Seberang Perai Municipal Council, the Penang Island City Council, the Department of Town and Country Planning, the Department of Fisheries, the Department of Agriculture, the Forestry Department, the Department of Irrigation and Drainage, the Malaysian Fisheries Development Authority, the Fisheries Research Institute and the Malaysian Forestry Education Institute (FRIM). The development of these guidelines also involved aquaculture operators represented by the Penang Aquaculture Breeders Association and several fish and prawn breeding companies in the State of Penang. The State Government uses these guidelines in the implementation of the ZIA project, where the buffer zone from the coastline is 200 metres, enabling the mangrove swamp forest area to remain preserved while at the same time development can still be carried out. For the information of Honourable Members, the ZIA project is the first project to adopt the aquaculture guidelines and will become a model project for aquaculture projects in the State of Penang. To ensure that the implementation of the ZIA project does not have a bad effect on the residents, the environment and the natural surroundings, the State Planning Committee has required the preparation of an EIA Report, Environmental Impact Assessment. A meeting regarding the presentation of the Terms of Reference, TOR for the preparation of the EIA report was held on 22 January 2016 at the Department of Environment, Putrajaya. However, the consultant appointed was asked to make improvements and resubmit the TOR. After a series of discussions, the State Government, as host, took the initiative and approach through CMI, Chief Minister Incorporated, to re-appoint a consultant who has experience in preparing such a report, which is now known as the EIA Report Schedule II and who also has experience in the marine sector. CMI has appointed a new consultant to prepare the report, namely Fundley Marine and Consultancy Sdn Bhd. The consultant who was appointed held preliminary discussions and presented a pre-report to the Department of Environment, Putrajaya and the Department of Fisheries on 17 May 2018 and also on 5 June 2018. Honourable Members of this House, the Honourable Member for Sungai Acheh raised the issue regarding the intrusion of KENKA vessels into the waters of this State. As in the debate on my question ID649 earlier, the State Government is aware of the issue of the intrusion of the two-boat KENKA vessels and is making efforts to deal with activities that violate licence conditions under Section 8 of the Fisheries Act 1985. Among the short-term plans that have been taken is a monitoring and surveillance programme covering the enforcement of laws in the waters of this State. For the long-term plan, the Department of Fisheries Malaysia has imposed higher compound rates as a preventive measure starting from 1 June 2015. From that date, licences will also be suspended for one year from the first offence, while equipment will be confiscated for the third offence. Cases will be brought to court for the fourth offence. As a drastic step to overcome this problem, the Department of Fisheries Malaysia has also amended stricter licence conditions under the power of Section 10, Fisheries Act 1985 to control the operations of pusat kanker vessels and issued a circular on the phased removal of the two-boat KENKA pukat vessels and taking control measures. In view of this, the State Government is of the view that the act of burning and sinking the two-boat KENKA vessel is not in line with existing law. I do not dare to do that, Honourable Member for Sungai Acheh. If the Honourable Member is brave, please go ahead… (interruption).

H’ng Mooi LyeDAP · PHJawiEN

Question. Earlier I wanted to ask, but the Honourable EXCO member was far too quick. Regarding the RM400.00 voucher, I want to ask whether the office of the Honourable EXCO member has ever received complaints about the RM400.00 voucher, because on my side I have received a complaint stating that the RM400.00 voucher received is based on the answer I asked of the State Government through the Malaysian Fisheries Development Authority (LKIM), which identified three (3) shops that could meet and cater for the needs of coastal fishermen in the fishermen assistance programme. The complaint I received is that when fishermen go to buy nets or those items, the market price of those items is slightly lower than RM300.00, but they have to use the RM400.00 voucher to buy items worth only RM300.00. Therefore I ask the EXCO to review again whether the prices of the equipment supplied in exchange for the voucher are correct. Whether the EXCO has the price list for the equipment bought by fishermen, or whether the EXCO feels it would be better for us to simply change the voucher to cash for fishermen. Therefore fishermen can use money, use RM400.00 in cash to buy those items. Otherwise we must review those three (3) shops again. I think previously one of the shops was located in Tanjong Piandang in the State of Perak and not in the State of Penang. If we want to supply, we have priority, but now we are equal, whereas previously we had to give priority to local Penang children to supply equipment like this.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you to the Honourable Jawi. For the information of the Honourable Member, this programme, if I may, I will explain from the beginning, the origin of when we purchased the nets themselves. The State Government supplied nets directly to fishermen, but when we ran this programme we faced a problem because we could not achieve the appropriate number of nets, whereas previously we supplied RM360 for each fisherman and we bought those nets. From year to year the prices kept rising, firstly because of currency exchange problems, secondly because of the GST problem at that time, which caused the prices of these nets to soar to more than the cost we were entitled to give. When we discussed how we could give this programme of assistance to fishermen again, the idea arose to hold this voucher. Which is a fixed amount. A fixed sum of RM400 under which fishermen will always get goods worth RM400. Wait, wait, Honourable Member. Be patient, be patient. So RM400. I have also received complaints from fishermen about the issue of traders who have taken advantage of these suppliers, taking the opportunity to raise prices slightly compared with market prices. I have in fact opened the space to all suppliers and also traders who sell nets in the State of Penang to register with the State Government; only these three (3) were willing. In fact we had to beg them to run this programme. So I welcome it if the Honourable Member can also promote it to other traders, who, if they sign up to become panel members of the State Government, we will be able to supply a list that these shops can also supply nets to Penang fishermen, where this voucher can be used, so that the price is not monopolised by these three (3) shops alone. And we have also asked these shops, these suppliers, to give us a price list before they supply any equipment to fishermen. And we also monitor from time to time whether the fluctuation in that price has risen sharply. But until now I believe many of these vouchers have been redeemed at these shops, where now fishermen officially receive a contribution of RM400 from the State Government. The proposal to give a cash contribution of RM400 was also discussed in the previous term but was not agreed at the level of the State Executive Council. Please.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

The Honourable Member asks for clarification. Regarding the two (2) trawlers. What I mean is not burning or sinking during capture, that is, during the capture under the court's legal process, how it is in Indonesia, burning, or perhaps if burning is not possible, at least we sink them for one year to five (5) years so that it becomes a lesson for them, because they are in the waters of Penang extremely violent. Just two (2) weeks ago they rammed directly into the jetty of a person who made a police report, they even threatened lives, even though they came from Perak into our waters. Even in Perak itself they lay nets within 5 nautical miles. So that is fine, that is the Perak area, Honourable Member. But in our area, the Penang area, they intrude directly into our waters, which we ask to be enforced further, from one year to five (5) years, or sunk to become artificial reefs once confirmed by the court to become artificial reefs. Is that right?

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Sungai Acheh. I take note of the Honourable Member's views. Firstly, I agree that enforcement of this matter requires firm action from agencies, and at the same time integrity is also required, and all parties including the Police, including the Malaysian Maritime Enforcement Agency (APMM) and the Marine, and also the Department of Fisheries. I will also further discuss this matter with the Department of Fisheries and also with the Ministry of Home Affairs (KDN), so that we can see what other measures we can take and identify those who consider themselves gangsters at sea, who cause difficulties for fishermen and also for our aquaculture entrepreneurs there.

To also answer the question of the Honourable Sungai Acheh regarding fishermen's jetties that were demolished to make way for the Sungai Kerian Flood Mitigation Project. If the Honourable Member refers to the platform used by river fishermen to moor boats, that structure is an unauthorised structure. If there is a proposal to rebuild that platform, an application for a Temporary Occupation Licence (LPS) must be made to the District and Land Office of South Seberang Perai before works are carried out, before works begin. The State Government has also given a written reply to the Implementation Coordination Unit (ICU) of the Prime Minister's Department to look into this matter.

Members of the House and Mr Speaker. I would like to give a brief comment on hand, foot and mouth disease (HMFD), which, for the information of all Honourable Members, is not only occurring in the State of Penang but across the whole country. The disease is caused by the coxsackievirus A16 and enterovirus EV71. EV71 is transmitted through direct contact, nasal fluid, saliva, blisters or blisters and the faeces of infected children, as well as contact with surfaces and play equipment contaminated with the HMFD virus. The State Government, through the State Health Department, has carried out various efforts in tackling the problem of the increase in HMFD cases. However, the success of these control measures also requires cooperation from parents, operators of nurseries, kindergartens, care centres and also schools. Among the actions taken are visits to all nurseries, kindergartens and care centres for the purpose of inspecting the hygiene and safety standards of premises. Until now the coverage of visits is 100 per cent, covering a total of 850 premises. In answer to the question raised by the Honourable KOMTAR, the State Government, through the State Health Department, is always carrying out efforts to raise public awareness about HMFD. The State Government has conducted health research activities to increase awareness of HMFD, especially among nursery operators, kindergartens, care centres, schools and local communities. For the record of Honourable Members, this year alone individual advisory services have been given to 20,897 people, guidance sessions to 25,300 people, 2,637 group discussion sessions, 164 health talks reaching 13,127 people, 95 exhibitions and 2,326 posters have been printed and displayed. All of these activities are efforts by the government to educate and raise public awareness about the spread of this disease.

Referring to dengue, which is a disease commonly occurring in urban or city areas. The position of the State Government remains the same, which is to fight dengue wholeheartedly. Up to Epidemiological Week 31, there was an increase of 80.73 per cent compared with the same period in 2017, namely 2,832 cases reported compared with only 1,562 cases in 2017. Recognising this increase, the State Government has already mobilised vector control efforts in all identified locations with the cooperation of the State Health Department, local authorities and the local community. For the information of Honourable Members, the State Government has also subscribed to the Dengue Outbreak Forecasting System, or Crush Aedes Totally (CAT), which uses the services of Artificial Intelligence. Through the introduction of this system it creates a Sense of Urgency among the officers involved in vector control. And although this system is not a dengue prevention system, it helps forecast areas expected to become dengue outbreaks so that vector control can be carried out more systematically.

The Honourable Bayan Lepas has requested that the State Government re-propose the proposal to upgrade the Teluk Kumbar health clinic to be taken into account in the 4th Rolling Plan under the Eleventh Malaysia Plan (RMK-11). However, for the time being the government no longer intends to upgrade the Teluk Kumbar Rural Clinic. Residents of Teluk Kumbar can still obtain comprehensive health services at the Bayan Lepas Health Clinic, which is within a distance of 5 kilometres from the health clinic. Following the road upgrading project carried out recently, the time taken for patients to reach the Health Clinic in Bayan Lepas has also been shortened. Residents of Teluk Kumbar can also obtain health services at the Sungai Batu Community Clinic, which is located 3 kilometres away. The priority of the State Health Department at this time is to upgrade the Bayan Lepas Health Clinic. However, the upgrading proposal proposed under RMK-11 in the 4th Rolling Plan has still not received approval from the Ministry of Health Malaysia (KKM).

To further empower the health sector in this state, the State Government, through the MMK Health Committee chaired by me, has decided to establish a Non-Communicable Disease or Disease Prevention Committee, a Health Infrastructure Projects Monitoring Committee, a Medical Tourism Committee, and at the same time to maintain the Dengue Special Task Force Committee. All of these are done in order to ensure that the State Government can improve the health services delivered to the people of this state.

For the information of Honourable Members, I also need the support of Honourable Members to back the State Government of Penang's efforts in a programme called PENBAR (Penang Bebas Asap Rokok, or Penang Smoke-Free). Penang Smoke-Free is a programme under which we have declared more than six (6) recreational areas, including all the impact zones of the George Town UNESCO World Heritage Site, as Smoke-Free Areas. It is my and the State Government's aspiration to announce in the near future that the entire State of Penang is a Smoke-Free Area. Clap a little... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Excuse me, Honourable Seberang Jaya. Before moving on to PENBAR or Smoke-Free, I want to comment on hospitals. It is said that we indeed have Medical Tourism, there are quite a lot of private hospitals in Penang that bring medical tourists from Indonesia, but I will focus on the health services at our public hospitals. Two (2) weeks ago the Minister of Health visited Sungai Bakap Hospital and saw its condition for himself, and Seberang Jaya, the area of the Honourable Seberang Jaya himself, has just been upgraded, but my concern is about the Penang General Hospital. It was said that in last year's Budget the former Prime Minister approved RM500 million for expansion of the hospital... (with permission). It is said, but the problems faced are the lack of space, insufficient room, and also technical problems, such as the JKR being hesitant about whether it can obtain approval from the PBT because the old hospital building there is a heritage building. That is what was stated according to the information I received. I hope the State Government will also look for a solution if there are technical issues such as heritage matters that we can overcome, we must overcome them, and this new block must be built urgently because there are quite a lot of heart patients who have increased, and I am told almost every day 15 procedures are carried out at Penang Hospital, and we are the largest in this, I mean this Northern Region, so I hope the State Government will do something about it, if possible obtain land for them.

Dr. Afif bin BahardinPKR · PHSeberang JayaEN

Thank you, Honourable Bagan Dalam. Actually, the Honourable Member is earlier than my winding-up. I have not finished yet. We have not yet reached that point. I only want Honourable Bagan Dalam to support me first in implementing PENBAR. The Honourable Member supports… (Interruption), support. Thank you. For the information of all Honourable Members, this PENBAR initiative aims to declare the whole of the State of Penang a Smoke-Free Area in order to reduce public tolerance towards smokers. We are not prohibiting smokers. Smokers may smoke, but there are areas that have been gazetted for them to smoke. All other areas are areas where smoking is prohibited, so that is the purpose of implementing the PENBAR programme throughout the State of Penang. Thank you to Honourable Bagan Dalam for giving a teaser of what I will present after this, namely the implementation of projects under the Eleventh Malaysia Plan involving the Penang State Health Department, which involves many development projects in this State.

For the information of all Honourable Members, I only obtained all this information after 9 May, because I did not receive much information before that, as there were instructions not to share all information with me. But let us leave the old behind and start anew, even though we have painfully had to face the remnants and leftovers of past mistakes that caused problems for the development of many infrastructure projects in the State of Penang involving hospitals. As all Honourable Members know, for the Penang Hospital now, the Penang Hospital Phase Two upgrading project has been started to upgrade several facilities, mainly air-conditioning and also facilities in the Operation Theatre, Dewan Bedah. This project was expected to be completed in early February 2018. However, the completion period of this project had to be extended until December 2018, so this project was given an extension of time twice until December 2018 because the main issue faced, which has affected the main issue faced because of the delay of this project, is that the air-conditioning in Block B, covering four (4) rooms, did not achieve the required parameters. And for the information of this honourable House, many patients had to wait their turn, especially when the Dewan Bedah could not be used. This is only the tip of the iceberg of the problems faced from the implementation of infrastructure projects involving public health facilities in the State of Penang.

For the information of the House, the main problem in the State of Penang involving our hospitals is congestion, where many of these hospitals were not upgraded at the appropriate time, which caused a lot of backlog, so that these areas and hospitals face difficulty in accommodating the admission of patients who come to seek treatment. As for the matter raised by the Honourable Member, there are several projects in the current plan. Those I have identified, the main one being the upgrading of the women and children's block, the construction of a new women and children's block, which is the Maternity Hospital, Child and Maternity Hospital Pulau Pinang, which was supposed to be built on the site of the old Maternity Hospital. For the Honourable Member's information, this old Maternity Hospital has become unsafe for occupation, so it was vacated around 2016, and until now this project is still at the stage of re-tendering, and the MOF has called back, the Ministry has re-called the tender, and the latest letter of acceptance (SST) is expected to be issued in March 2019 for the construction of this Maternity Hospital. Secondly, there is the main construction, namely the construction of a specialist clinic building valued at RM500 million. I believe this is also still in the evaluation process, and the letter of acceptance (SST) is expected to be issued in April 2019 as well. So this is part of the projects that have been delayed and could not yet be started because of the constraints and problems faced previously. But for the Honourable Member's information, yesterday I had to leave this House for half a day to attend a meeting with the Honourable Minister of Health in Kuala Lumpur with all State Health EXCOs in Malaysia, and these matters were raised, and several mitigation measures are being implemented to overcome this congestion problem and to expedite these projects being implemented in our State, In Shaa Allah. Regarding the question raised by the Honourable Member for Bertam on the frequency of monitoring water reservoirs in schools to overcome the spread of dengue, the State Government, through the Health Department, in principle carries out inspections of water reservoirs in schools at least twice a year or once every six (6) months. However, this inspection will be carried out more frequently if there is a need and depending on the current situation. That is why we encourage the schools themselves to implement this monitoring programme, and not only train the maintenance officers in schools but also train their pupils and teachers so that they can identify areas that have the potential to become areas where dengue spreads.

Honourable Members, for the Rural Development sector, the State Government continues the Special Economic Project with the aim of helping the community, especially the rural community. The programmes drawn up under this initiative include the New Build and Repair Programme for Poor People's Houses, the Economic Enhancement and Recovery Programme, namely equipment assistance, and the Stall Repair Programme. Up to August 2018, the State Government has spent a total of RM977,000 to implement the new build programme, and a total of RM965,000 for the repair project of poor people's houses. Meanwhile, for the economic enhancement and recovery programme, a total of RM142,000 has been spent. The State Government has also implemented 18 short-term courses to empower the skills of the community, especially in rural areas, involving an allocation of RM95,455. For stall repairs this year, the State Government has also spent a total of RM873,000 for this purpose. This effort does not stop here, and the State Government has also spent a total of RM788,000 on village road projects in this State. To improve the existing Rural Development programmes, the State Government, through the MMK Rural Development Committee, has decided to set up two (2) new committees, namely the State of Penang Rural Development Policy Committee and the Rural Development Projects Committee. The setting up of these committees is important in monitoring programmes aimed at empowering rural residents. At present, there are 12 prep classes that have been implemented by JKKK throughout the State of Penang. The District and Land Office is also in the process of collaborating with Zakat Pulau Pinang and Universiti Sains Malaysia to run prep classes in village areas, including at Surau Dondang Madrasah Darut Taqwa under the management of JKKK Sungai Dondang, Paya Terubong. I also commend this smart collaboration and hope that all JKKKs and also Government agencies will be able to move towards realising more sustainable rural development. To achieve this goal, the MMK Rural Development Committee will also draw up a joint retreat between all federal agencies and State Government agencies to hold an ice breaking session so that we can coordinate and gather all the existing resources to implement better rural development for the State of Penang.

Finally, I would like to urge all Honourable Members that we may together carry out our responsibilities and trust to develop this State towards a new Malaysian Nation that is more dynamic, sustainable, people-centred and has integrity. I also would like to take this opportunity to wish everyone a Happy Merdeka Day… (Interruption). Nearly finished.

Ong Ah TeongDAP · PHBatu LancangEN

Afraid to finish, want to interject a little.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

Want to give way to the Speaker?

Deputy Speaker of the House

Bagi.

Dr. Afif Bin BahardinPKR · PHSeberang Jaya

Last.

Ong Ah TeongDAP · PHBatu LancangEN

Thank you, Honourable Member. Mr Speaker, Honourable Seberang Jaya, I was interested in what was said about Aedes mosquitoes in schools. As I suggested, can we start in schools by having pupils carry out fogging once a week during the assembly, just for 10 minutes, which will help clean up school areas and also reduce dengue cases in school areas. So that is my suggestion. So, my second suggestion is to request Honourable Seberang Jaya, when I was at MBPP as a councillor, we had also long requested from the State Health Department to delegate power to the Council to close premises, but due to the policies of the previous government this was indeed not granted. So I hope that this time I request here that Honourable EXCO bring this issue to the State Health Department or the Ministry of Health Malaysia, to delegate power to MBPP under the Food Act 1983. Thank you.

Satees A/L MuniandyDAP · PHBagan DalamEN

May I comment a little? Not only for closing food premises, since Seberang Jaya just now told us about PENBAR, Penang Smoke-Free (PENBAR). For those who smoke in public places in prohibited areas, no compound or summons can be issued by the PBT, but only by the Ministry of Health, and they do not have enough officers to issue these compounds. I ask Seberang Jaya, if we want PENBAR to succeed, we need to put pressure on the Ministry of Health to give the approval that my friend from Batu Lancang asked for.

Deputy Speaker of the HouseEN

Sungai Bakap can, sorry, apologies to Jawi.

H’ng Mooi LyeDAP · PHJawiEN

Regarding, I just want to ask the EXCO about the hospital in Sungai Bakap. Two (2) weeks ago, three (3) weeks ago, we had a visit from the Deputy Minister of Health stating that there is a proposal to build a hospital in Batu Kawan. But for local children born at the Sungai Bakap Hospital, I feel the more suitable area is the Sungai Bakap area. If we want to get it in the Sungai Bakap area, I think previously we had a proposal near the jail, next to the prison. I think Honourable, the Sungai Bakap area is also 100% agreed (with permission), because the Batu Kawan area is indeed not suitable, due to the location which is in Bukit Tambun. The Bukit Tambun area is indeed not suitable for us. The Sungai Bakap area is indeed the most suitable place… (Interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Seberang Jaya, I object to this, because it is not only Batu Kawan and Bukit Tambun. From Perai all the way to Bukit Tambun, going to the Bukit Minyak health clinic, it is full, so we need… (Interruption).

H’ng Mooi LyeDAP · PHJawiEN

Actually Hospital Sungai Bakap… (Interruption).

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I am not the Minister of Health. I am not the Minister of Health.

Deputy Speaker of the HouseEN

Enough… (Interruption). Okay, okay Honourable Jawi.

H’ng Mooi LyeDAP · PHJawiEN

The Deputy Minister of Health referred to Honourable EXCO, so these are the wishes of the people in Sungai Bakap and also in the Jawi area. I think Tambun also agrees with us. Thank you.

Dr. Afif Bin BahardinPKR · PHSeberang JayaEN

I will answer one by one. Thank you, Honourable Member. Mr Speaker, Honourable Batu Lancang raised the matter of the awareness programme. I agree, but the creativity of the programme must be reworked. Combi too we will intensify among the community, and we also organise many. For example, for the information of Honourable Batu Lancang, we encourage the participation of young people and children in gotong royong programmes. For example, we organise many competition programmes, such as who collects the most rubbish gets a prize. These are among the programmes, examples of the creativity we carry out, and I welcome the views of Honourable Batu Lancang. I will see how we can collaborate with the State Education Department to look at improving the existing programmes that have been implemented by the Ministry of Health and also the Education Department. For the information regarding the legislation and powers, there are several issues on this matter of powers. In fact, the Ministry has no objection to delegating power to officers in the Municipal Councils and also the City Councils. However, among the issues raised before are, for example, when we issue a summons for smoking beside the State Legislative Assembly building, where does the compound money go? Who issues the compound? Now, whatever compound is issued will go to The National COFER, and it will go to the Federal Government. So that is why there has been a dispute issue before. In other words, if an MBPP officer issues a compound and the summons amount, that will go to the Federal Government. So this matter is being handled, and this is part of the effort to implement PENBAR throughout the State of Penang. This is among the matters I have raised to be discussed in the Committee so that we can refine it to achieve a win-win situation, because we also need... I agree that to a certain extent we need more effective enforcement, but the more important achievable goal that we want to achieve is to reduce public tolerance towards smokers and also to change the attitude of smokers, so that they themselves realise that they cannot smoke anywhere, but must smoke only in areas that have been gazetted for smokers. That is a brief answer to the question on the issue of powers to the Local Council. Secondly, regarding the issue of the hospital in Sungai Bakap. For the Honourable Member's information, we have indeed prepared land in Batu Kawan for the development of a new hospital. The land for the development of this new hospital has been set aside as part of the overall development plan of the Batu Kawan area for the development of a government hospital, and I have conveyed this wish to the Ministry of Health and also to the Minister's office, because at the moment it is still only at the pre-primary discussion stage, as we see the need for Batu Kawan, which is developing rapidly, to have a hospital in the South Seberang Perai District in the coming period. For that, I will stop there. Once again, I take this opportunity to wish everyone a happy Merdeka Day on 31 August 1957, 2018, 2018, with the theme "Sayangi Malaysiaku". Dato' Yang di-Pertua of the State Legislative Assembly and Honourable Members, with this pledge I respectfully ask to support.

Deputy Speaker of the HouseEN

Thank you. Honourable Seberang Jaya. Honourable Sungai Puyu, you have the floor.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you, Honourable Mr Speaker of the Penang State Legislative Assembly. Allow me to take this opportunity to express my gratitude and to extend heartfelt congratulations to all Malaysians, especially the people of Penang, who together have carried out a paradigm shift calling for drastic change in the administration of the Government of Malaysia. This is proven by the acceptance of Pakatan Harapan as the vehicle of struggle that will restore the glory of a New Malaysia. Mr Speaker, Dato', on this occasion too, I would like to express my millions of thanks to the people of Penang, especially the voters of the Sungai Puyu State Constituency (KADUN), who have once again given their mandate to me and my Pakatan Harapan colleagues and comrades in Pakatan Harapan to jointly administer the State Government. I extend my thousands of thanks to the party leadership, especially the Honourable Chief Minister, for the trust and appointment of me as a Member of the State Executive Council responsible under the portfolio of Welfare, Caring Society and Environment.

This public trust I will repay with loyalty by further diversifying welfare programmes and will strive to improve the existing mechanisms for contributions to welfare programmes. Honourable Member, Dato' Speaker, in line with the theme of the people's budget, which is the foundation of the core values of the Pakatan Harapan Penang State Government, the State Government certainly looks after the welfare of the common people, namely ordinary folk and working families, and will ensure the people's lives are future proof, so that no one is left behind in the Digital Economy and the Fourth Industrial Revolution. In an effort to make Penang an internationally standard and smart state, the State Government must carry out a transformation towards an entrepreneurial and welfare state in which all citizens are given equal opportunities to enjoy economic progress, and the fruits of prosperity can also be enjoyed by all regardless of religion, race, ethnicity and political understanding. Since 2009, the State Government, through the Equitable Economic Agenda (AES), formerly known as the Poverty Eradication Programme, has remained consistent and has given full commitment in helping the poor every year, without prejudice towards opposition areas. This can be proven through the consolidated data on this assistance, that most recipients of AES assistance are from opposition areas in North Seberang Perai. As of July 2018, the State Government has spent a total of RM29,925,010.00, and in total 1,116 individuals and families are currently receiving this assistance. There are 379 recipients from North Seberang Perai (SPU), 163 recipients from the District of South Seberang Perai (SPS), 266 recipients from the District of Central Seberang Perai (SPT), 163 recipients from the District of South West and 145 recipients from the District of North East.

In addition, the State Government is also very committed to carrying out various other welfare programmes to ensure that the people enjoy prosperity and well-being, as well as enjoy the fruits of the savings made by the State Government. The State Government's efforts in continuing to give attention to the welfare of the people through various welfare assistance, gratuity payments and appreciation for senior citizens, gold students of primary and secondary schools, assistance to Persons with Disabilities (OKU), single mothers, housewives and the Anak Emas appreciation deserve recognition. I would also like to appeal to all the ADUNs here that when there are events, the recipients be asked to register to be paid through EFT, because there are so many of them, and the State Government has made a setting whereby, if EFT is possible, we will make the EFT payment.

Welfare programmes implemented in Penang have reached a level that can be proudly acknowledged. Beginning with the Senior Citizens' Appreciation Programme and contributions to the heirs of deceased senior citizens in 2009, the State Government's care continued with the Single Mothers' Assistance Programme in the year (2011), the OKU Assistance Programme (2011), the Anak Emas Programme (2011), the Gold Student Scheme Programme (2012) and the Ibu Emas Programme in 2014, which have been successfully implemented. Each of these assistance programmes also has a specific module developed within the I-Sejahtera system, and these welfare programmes, which cover all levels of society, demonstrate the State Government's commitment to providing assistance to its people. The total expenditure spent on the I-Sejahtera programme as of August 2018 is RM249,454,140.00. All these major expenditures for the implementation of these welfare programmes are the result of the clean leadership of the State Government, which practises the CAT approach in administration with transparency and commitment. The Honourable Member from Pengkalan Kota has asked about the Volunteer Patrol Team. This is a caring society. In response to the proposal raised by the Honourable ADUN for Pengkalan Kota regarding the re-establishment of the Volunteer Patrol Team (PPS), the State Government, through the Welfare and Caring Society Committee, certainly intends to reactivate the team. For the Honourable Member's information, after all PPS activities were frozen, the State Government established a new patrol team to replace the PPS, namely the Volunteer Patrol Body (BPS), in 2016, to replace the PPS which was said not to be registered with the Registry of Societies (ROS) and is still in court. The main purpose of establishing the BPS is to manage security affairs in each community cluster to create a safe and united neighbourhood environment. The BPS, which was placed under the Community Development and Security Committee (JKKK), received the same fate as the PPS, in that the Ministry of Home Affairs (KDN) instructed the State Government to stop all activities and any programmes involving this BPS. However, in the great success of Pakatan Harapan in the 14th General Election, where it succeeded in creating history by overthrowing the government that had been in power for 60 years and subsequently forming a New Government. At this time, the State Government is planning to make a courtesy visit to the Ministry of Home Affairs (KDN) to request consideration and approval to re-recognise this PPS.

In addition, the State Government will also study and examine the role of the Rukun Tetangga Areas (KRT) and the Volunteer Patrol Scheme (SRS), as well as the readiness of cooperation from the Royal Malaysia Police (PDRM), before proceeding with the implementation of this PPS. I also had discussions with the director on how to unite with all other agencies in the PPS, so that our Court of Appeal won this case. The Federal Government at that time filed an appeal at the Federal Court, and until now there has been no decision, even though these cases have been heard.

ADUN Berapit raised the issue of the Ageing Population facing the State of Penang. I also agree with the Honourable ADUN for Kebun Bunga regarding the increase in the Ageing Population in this State. This increase also involves those overseas who choose to move to this state after retirement. This shows that many choose Penang as their main destination as a place to live in their old age, because the State of Penang has good facilities, and welfare matters are looked after through several welfare programmes implemented by the State Government. Most importantly, the citizens of the State of Penang show affection to everyone. At this time, the Department of Social Welfare (JKM) is building the Sinar Kasih Complex in the District of South Seberang Perai, and it is expected to be completed in September 2019. The Sinar Kasih Complex will function as a senior citizen care centre fully supervised by JKM, and every application to this Complex will be examined first before they are permitted to stay.

In addition, there are two (2) Senior Citizens' Activity Centres (PAWE) under the Penang Department of Social Welfare (JKM), namely in Balik Pulau and Pongsu Seribu, Kepala Batas. PAWE is a gathering place and activity venue for senior citizens but not a residential care centre, and it operates during office hours for five (5) days a week. Each PAWE has a committee that drives its operations, and a supervisor appointed to manage the PAWE. The State Government also implements the Empowering The Street Citizens Programme, where one of the strategies of this programme is to assist vagrants, including marginalised senior citizens, who will be placed in a transit centre that will be provided with basic necessities such as food, clothing and comfortable shelter as a starting point. This programme will also bring together the government sector, private sector and non-governmental organisations (NGOs) such as the Tzu Chi Buddhist Society, which will help provide health check-up services to vagrants, including senior citizens, at the centre concerned. The State Government has identified a suitable location to be a vagrant transit centre, namely at Lot 19, Jalan C.Y. Choy, which is a shop building owned by MBPP. Among the initiatives implemented by the State Government is the programme "Jom Hidup Sihat", which targets the people of the State of Penang to adopt a healthy lifestyle, especially among Senior Citizens. The State Government encourages every KADUN to establish community centres so that community activities such as Tai Chi, Qi Gong, Line Dance, Aerobics can be carried out, and outdoor gym equipment can also be provided. This programme also makes residential areas into centres of activity and daily recreation for senior citizens, to together foster the importance of health care and build good bonds of brotherhood, as well as instil a sense of neighbourliness and caring among the community here… (interruption).

Daniel Gooi Zi SenDAP · PHPengkalan Kota

Penjelasan.

Phee Boon PohDAP · PHSungai PuyuEN

Just a little. Apart from that, the State Government, through the Local Authority (PBT), also provides exercise equipment facilities, namely outdoor gyms, which are being implemented gradually according to the needs of recreational parks and open spaces used by the local community, including senior citizens.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Thank you, Honourable Member for Sungai Puyu, for the answer given. I sincerely offer my thousands of thanks for the reply given by the Honourable Member for Sungai Puyu just now, particularly regarding the senior citizens' activity centres. We understand that there are now two that are operated by the Department of Social Welfare, namely in Balik Pulau and Pongsu Seribu. However, may I know, what is the current usage rate of both these activity centres, so that I may know how many senior citizens come to these activity centres to carry out activities? Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

This centre is for daily use only, daily use only. That is, after looking at Pongsu Seribu and also Balik Pulau, it is encouraging, and the Honourable Chief Minister himself has also been in touch with associations, encouraging them to use their buildings, which until now have been left empty, as a daily centre. Therefore, the children who need to go to work can bring them and leave them there. We have applied to certain NGOs and also allocated allocations through the allocation from empowerment citizen so that they have some means to carry out activities there. This can greatly help families with parents whom they can bring there, where we manage food and other things. Also, Tzu Chi volunteers will go and provide health care services there. This has been planned and will be managed, and I congratulate the Honourable Member, because a pilot project will be established in the State Constituency of Pengkalan Kota.

Lim Siew KhimDAP · PHSungai PinangEN

Excuse me, thank you, Honourable Member for Sungai Puyu. I am interested in the daily activity centre by senior citizens. Indeed, as the Chief Minister has urged, that all existing organisations, especially in George Town, should open up space for senior citizens, whether for them to read newspapers or to have conversations together. And I think I saw at KOMTAR, in the KOMTAR area, do you know, Sungai Puyu, that many senior citizens from Padang Tembak. Padang Tembak, the flats of Padang Tembak have many senior citizens. They often take the bus, the free bus, to KOMTAR because KOMTAR has air-conditioning, has air-conditioning. They do not know where to go. So they come to KOMTAR, sit there and wander around, not knowing what to do, especially on the fourth floor. So here I think, is there a possibility that the State Government, may be, takes one or two existing shop units, units in KOMTAR, downstairs at the PDC, and makes them a daily activity centre for senior citizens. Maybe it is also possible to let them do something that can benefit our State Government's policy too, yes. Thank you.

Phee Boon PohDAP · PHSungai PuyuEN

Thank you for the suggestion. This suggestion will be used at Jalan C.Y.Choy, where we have a piece of land that will be converted into a pocket park. Pocket Park, and there is also a shophouse, No. 19, where we will carry out repair and renovation work, and it will become a centre for the elderly to go to. This is also a place where NGOs who are very willing to give food assistance can operate, and they are not arranged... early in the morning there is breakfast, there is lunch, there is hi-tea, there is dinner too. Therefore, it attracts many vagrants to sit at KOMTAR, and that site will also become a night shelter there. That shophouse is also being studied to become part of the Mutiara Food Fair. Anyone who wishes to give food whose expiry date has not yet passed may give it there so that the poor there can go and take it and enjoy it there. This is the plan, and I will proceed once it has been approved by BPEN. For the renovation, certain Honourable Members will be appointed to form a committee to administer the centre. After this, we hope that God willing we can overhaul the whole of Penang. This is being proposed, and for small centres like these, I invite you to come to my KADUN. There are indeed places there; we have certain stalls to which we have given facilities. They do not do anything extra, such as having a television, a place to boil water so they can drink tea and coffee, and so on; they sit there, chat, read newspapers and also watch TV there, and that is all. We do not encourage them to mix and play mahjong there, but they are there for one day, and this can be rolled out and so on. However, the proposal from ADUN Berapit requesting that the State Government establish an Elderly Care Centre will be studied and considered after taking into account various aspects, especially the financial implications for the State Government. We will conduct a study so that NGOs will be involved, so that the community also takes into account the stakeholder shift. All the stakeholders, and the people, through an allocation where we can give allocations for the empowerment of state citizens. The Honourable Member from Batu Uban asked a question concerning the existence of a dialysis machine, a dialysis centre. Indeed, at present in Penang, the data obtained from the Health Department shows that there are 1,964 patients currently receiving treatment. From there we look at the locations and so on for dialysis in government facilities: at the Government Hospital in the North East, Penang Hospital, there are 48 machines, and there are 48 patients currently receiving treatment there; there are 34 machines there. In the South West, Balik Pulau Hospital has 24 patients and they have 8 machines. In SPU, Kepala Batas Hospital has 23 patients and 10 machines; for SPT, Seberang Jaya Hospital, 35 patients and 17 machines. In SPS, Sungai Bakap Hospital, there are 26 patients and 9 machines, that is, a ratio of 190 patients, while the government has 94 machines. It is almost two (2) persons per one (1) machine. From the private sector in the North East there are 659 patients and 162 machines. In the South West, 215 patients and 58 machines; in SPU, 453 patients and 131 machines; in SPT, 283 patients

208 machines; for SPS, 164 patients and 97 machines. That is to say, in the private sector there are 1,774 patients, and the total is 638 machines. The fee for government facilities is indeed RM13.00 per session, RM6.50 for the elderly, and free for OKU. For the private sector, it is between RM120.00 and RM250.00. The State Government does have a CAT Dialysis Centre in Balik Pulau. There we have 14 machines, and at present we have 60 patients. We have run three (3) shifts, and the fee is only RM10.00; the other patients are borne by the government and also by PCC. The State Government has proposed how we will work together with all 44 Dialysis Centres throughout Penang to cooperate and jointly work with the State Government to provide assistance to patients who are indeed among the poor or the poorest, because they receive treatment. To obtain approval, we require recommendations from the JKKK, or PTK, or the ADUN of the area, after which they will be investigated by the Welfare Department and also the Penghulu, and brought to the meeting at the District Office under the District Poverty Committee. After approval, it will be sent to my office to be approved by PCC (Penang Committee Case). PCC (Penang Committee Case) is indeed an organisation set up by the State Government, in which the Most Honourable Chief Minister is the chairman, and I have been delegated the authority to carry this out. So..(interruption).

Goh Choon AikPKR · PHBukit TambunEN

Permission to interject. Honourable Sungai Puyu, Honourable Deputy Speaker, regarding the figures just given, namely the private haemodialysis centres: does this figure include non-profit welfare haemodialysis centres such as the Pusat Hemodialisis Seberang Perai Selatan? Secondly, does the State Government have any initiative to provide, for example, periodic allocations to non-profit haemodialysis organisations such as the Pertubuhan Hemodialisis Seberang Perai Selatan?

Phee Boon PohDAP · PHSungai PuyuEN

Indeed, the State Government has asked me to request the other 44 organisations, including dialysis centres, to discuss how we can coordinate and work together. And here, the non-profit ones, that is, the non-profit ones, we have also checked with the government and the Health Ministry, where at present the Ministry has given RM100.00, and we requested that these patients pay only RM10.00, the State Government pays RM30.00, and the remaining everyday supplement will be paid by PCC, Penang Community Case. This is an organisation set up by the State Government. I am willing to work hard; we can discuss and how we can work together. So I hope that next year, in 2019, we can immediately begin to carry all of this out. Indeed, because there is an MoU signed, how to make arrangements, and the status of patients who receive treatment there will be checked by the District Office. Honourable Dato' Yang di-Pertua. For the environment. Surely we all realise that environmental issues are becoming increasingly challenging by the day, and efforts to address them require a high level of cooperation and commitment from all parties. Environmental problems such as air pollution, water pollution, the disposal of toxic solid waste, illegal logging, the depletion of natural resources and so on, have resulted in an imbalance in the environment. These issues need to be, and I emphasise here, need to be addressed collectively and holistically at both State and Federal levels. Therefore, the State Government will place emphasis on energy efficiency, renewable energy and sustainable solid waste management. For this purpose, the State Government has begun developing the Penang Green Agenda (Penang Green Agenda) 2018 – 2030, which aims to chart strategies towards sustainable development based on the United Nations Sustainable Development Goals (UNSDGs) in order to face future global environmental challenges. The Penang Green Agenda will function as the foundation or blueprint in propelling Penang towards becoming a sustainable green state. The State of Penang has indeed pioneered various green initiatives at state level towards bringing sustainability into the daily lives of the community. However, these efforts were not taken seriously by the previous Federal Government, and the State Government was always seen as standing alone in this matter. Nevertheless, the transfer of power and the new leadership in Putrajaya following the 14th General Election (PRU 14) will surely bring new impetus to collective efforts towards sustainability at State level together with the Federal side. In this regard, I believe that in future the State of Penang will continue to move forward in environmental issues without looking back, with cooperation from the relevant Ministries at Federal level. Indeed, from the past, when the Federal Government was from Barisan Nasional, there were many matters that we proposed and they would not support them and they did not get approval. When I attended meetings in Putrajaya, all proposals were not given consideration, such as when we migrated from lamps, fluorescent lamps, to LED, and we requested for battery waste, the requirements in the list, that is to say, their schedule, were also not given consideration, and so on. Here, therefore, I appeal that this is an opportunity for Penang, through all ADUN, to work together, so we have these sustainable development goals, 17, we fully support and show that Penang, as in the election manifesto, Penang will be the first free state in the whole of Malaysia. The issue raised by ADUN Pantai Jerjak, where the Honourable ADUN Pantai Jerjak raised the issue of pollution in Sungai Nibong Kechil, which is located within KADUN Pantai Jerjak. At present, the river receives discharge from the industrial areas of Bayan Baru and Bayan Lepas as well as several residential areas around it. The State Government, in its efforts towards the rehabilitation of the river, will adopt an awareness approach involving stakeholders consisting of residents' associations, manufacturers, traders, alongside integrated enforcement involving departments such as JAS, JPS and MBPP. Here I am confident it can succeed, and I also congratulate MPSP, where at one time, when people wanted to come to Penang, traffic at the Penang Bridge up to the toll changed greatly, and MPSP succeeded through programmes like this where we became stakeholders in discussing the SOS clinic, and everyone became stakeholders, and we succeeded. For this case I have confidence. In this regard, the Department of Environment will also ensure that every industry operating and subject to it must comply with the Environmental Quality (Industrial Effluent) Regulations 2009. Any industrial party found to be in breach of these regulations may be subject to firm enforcement action such as compound offers and court action. In addition to routine inspections, the Department of Environment has also introduced Guided Self Regulations (GSR), where industrial parties must ensure that the operation of their premises always complies with the Environmental Quality Act, 1974 by mainstreaming environmental management (environmental mainstreaming). One element of environmental mainstreaming is that factories must appoint a competent person who has attended a course recognised by the Director General of Environment, such as Operation of Industrial Effluent Treatment Systems, to ensure that every effluent treatment system always functions properly, so that compliance with the discharge standards by industry is constantly monitored and adheres to legal requirements. This has been done.

The Honourable Member from Machang Bubuk raised the need for the State Government to monitor factories that import and process recycled plastic throughout the State of Penang. The State Government indeed takes the issue of imported plastic waste brought into the State of Penang seriously. At present, a total of 27 companies or factories have been licensed to import plastic waste in Penang, with a total permitted capacity of 109,655 metric tonnes per month. For your information, Honourable Member, the authority to approve the import of plastic waste lies under the National Solid Waste Management Department (JPSPN), Ministry of Housing and Local Government (KPKT). In this regard, the State Government's prohibition on the import of plastic waste is in line with the prohibition on the import of plastic waste under tariff code HS3915 enforced by KPKT on 23 July 2018 for a period of three (3) months. The prohibition applies throughout Peninsular Malaysia and Sarawak in accordance with the Customs (Prohibition on Imports) Order 2017. In addition, KPKT through JPSPN will set up a plastic waste Approved Permit taskforce chaired by the Director General of JPSPN to review all current procedures and policies for importing plastic waste under tariff code HS3915. The membership of the taskforce consists of agencies such as the Department of Environment (JAS), the Royal Malaysian Customs Department (KASTAM), the Ministry of International Trade and Industry (MITI), the Malaysian Investment Development Authority (MIDA) and the Solid Waste and Public Cleansing Management Corporation (SWCorp). Therefore, the State Government's stance is in line with KPKT's current decision. Besides that, as a follow-up initiative, the State Government through JAS and the Local Authorities will monitor the compliance of operations of factories importing plastic waste so that they are in line with the laws in force. Here, indeed, I have a meeting where every factory will be inspected. Whether they have a water treatment system, because they wash the water and discharge it. Here, before Pakatan Harapan took over, we had expressed concerns to them, we gave them APs to import plastics for recycling. Why did they not consider that this place is suitable or unsuitable. Whether this factory has a water treatment system or does not have one. That was Barisan Nasional at that time. Now it is not the same. So we will investigate, and apart from these 27, indeed there are many more without permits. For those without permits, we will take action, and the action will be to the fullest extent, up to the point of closing their factories. The environment must be protected.

Lee Khai LoonPKR · PHMachang BubukEN

Seeking clarification, Honourable Sungai Puyu. Thank you for the answer given regarding recycling factories for imported plastic waste in particular. Según the answer just given, there are 27 companies processing this imported plastic waste throughout the State of Penang. And in one month they have been permitted to recycle more than 100,000 metric tonnes. So this is a very large quantity, and in line with KPKT's prohibition on this imported plastic, are these factories still able to carry on processing this imported plastic waste? One thing is that the source can no longer be imported. So where will the factories that have been approved obtain plastic waste from again? I think this is a very important matter because we do not want Penang to be made a rubbish dump, because this imported plastic waste was actually imported from European countries which previously sent it to China. And now China no longer wants this plastic waste, it does not want to receive it, and then these European countries have sent it to South East Asia. Referring to what we have received, the answer from YB Sungai Puyu, every month more than 100,000 tonnes. That is not small, and that is very large, and most of these factories are in Central Seberang Perai, and I see that there are many in the areas of Bukit Minyak, Permatang Tinggi and many areas close to residential areas. So this is what many of our residents are very worried about, the mushrooming of such factories after the rain, which we are very anxious about, and can we, the State Government, make a decision in line with KPKT, where we must ban and stop all factories processing this imported plastic waste.

Phee Boon PohDAP · PHSungai PuyuEN

Indeed, as I said earlier, these APs were issued to them during the Barisan Nasional era. I have said that all factories, even if you have an AP, must be inspected to check whether the factory has all the equipment for cleaning, that is to say, water treatment before discharging. Because when they wash this plastic, the water is discharged into drains, enters the ditches and rivers, and after that the sea will destroy biodiversity. Concerns were also conveyed to the Central Government at that time. And now, why are they still, that is to say, in discussion, what is at the site after the export port, already on the way, cannot be held back. If it is held back, where will they place it? Dump it in the sea or there. When on that day we made an objection there, at NBCT alone, no fewer than 500 containers were stuck there. After that, the discussion is about who has their bill of lading to allow them to enter. Those that have not yet cannot. Checks from the bill of lading. This has been done, so this is to the tyrant, if the tyrant, after the House sits, a meeting will be called, because most of them are in Seberang Perai and most are indeed in KADUN Bukit Tengah. Checks will be carried out.

Goh Choon AikPKR · PHBukit TambunEN

Seeking clarification from the Honourable Member for Sungai Puyu. Here there is a written reply from the Environment ministry, which mentions that unlimited odour pollution, such as organic odour, cannot be acted upon under the Environmental Quality Act 1974. Regarding this shortcoming, what action can be taken apart from this Act?

Phee Boon PohDAP · PHSungai PuyuEN

For odour control there is indeed a standard, dioxide level and so on. Here we raised the decision of the State Government that when they wash, they will melt plastic and mix plastic with virgin plastic so that they can obtain pallet plastic again. When they burn, it is not only the odour that the State Government is worried about. The State Government is worried and anxious. It is so dangerous. Although we are at KOMTAR, we are also with you at the site because of the odour and also the dioxide, which we feel is very worrying. We are with you, we will take action. After the House sits, I will make a visit to Bukit Tambun to inspect several factories, because I have received reports from officers that the factory operators are very arrogant. Government officers wanted to enter to inspect but they were not even allowed in. I will personally go down there. Thank you. (Desk-thumping in the House.)

H’ng Mooi LyeDAP · PHJawiEN

Seeking to intervene. I also request, Honourable Member for Sungai Puyu, that you come to Jawi so that we can make a visit, or ask the Department of Environment to carry out operations on factories that operate without licences or are illegal factories.

Phee Boon PohDAP · PHSungai PuyuEN

We have indeed taken action against a plastic factory in Jawi where they breached conditions, and the construction of the factory is also not valid. I do not want to say illegal; it is unlicensed and not valid. Half of it has been demolished and they have filed an appeal. If time permits, we will also take action there.

H’ng Mooi LyeDAP · PHJawiEN

For the information of the Honourable Member, we now find that there is another factory making plastic, of the kind said to be imported plastic, also in the Jawi area.

Phee Boon PohDAP · PHSungai PuyuEN

Indeed, in the investigation conducted, we found that when this factory applied for its AP, they made a very impressive model. All the equipment was there, but what I do not understand is, if we take into account the capacity of their machines, their capacity is so small, why could they import so much? They import a little to obtain their AP, they operate their factory, and the rest they give to unlicensed factories in hidden places to operate after they have taken it back. This is to reduce their costs. This is also under investigation.

Lee Khai LoonPKR · PHMachang BubukEN

Seeking a little clarification. Thank you, Sungai Puyu. I think it is also important if the Department of Environment (JAS) or the Seberang Perai Municipal Council (MPSP) could carry out investigations into factories operating to process this imported plastic waste without licences or illegally. We want to know how many more, because now this reply is only 27. And as Sungai Puyu said, I think there are many more like this; in my area too, there have been reports, at least two already. Just now, other fellow ADUNs in their areas also have the same problem. So while we investigate licensed factories to ensure they do not commit any irregularities and any SOP violations, we must also ensure that illegal factories, which may be operating now and of which we have no record, are dealt with. So I suggest that JAS and MPSP must be more proactive. Go down more quickly to ensure that these illegal factories are tackled more swiftly. That is my suggestion.

Phee Boon PohDAP · PHSungai PuyuEN

This suggestion will be accepted, because at present all efforts are integrated operations. Integrated operations, we are no longer in a silent mentality. Integrated operations, that is, involving the relevant departments including Immigration as well. When we go down to the ground, we also bring Immigration so that enforcement will be carried out. I indeed accept the statement from the Honourable Member for Machang Bubuk. That's right, these 27 are valid cases, but beyond these 27 there are indeed many more in Juru alone. In one place I identified, there are roughly 20 factories that have no permission from the Local Authority. There really are so many. We have carried out investigations, and after the investigations there will be a meeting, and after the meeting, integrated operations will be carried out. We are very determined and we are very firm, because when they cook plastic without control, they will release dioxide into the air, and that dioxide will destroy the health of the citizens or residents around there. We are on the same page.

The Honourable ADUN for Komtar raised two matters regarding the implementation of the 'No Single-Use Plastic' policy, namely requesting that the 'No Straw' policy be implemented in phases (one year) to give traders and manufacturers the opportunity to find alternatives, and secondly, that the State Government be requested to set an example by not using single-use plastic in official State Government programmes. This has indeed been accepted; it is already in the guidelines being prepared by BPEN (the State Economic Planning Unit). For the Honourable Member's information, the Penang State Government intends to implement the No To Single-Use Plastic Policy starting 1 January 2019 in phases, beginning with the No To Plastic Straw Policy throughout the state. The method to be applied for this prohibition is structured into three phases involving the following activities: (a) First Phase (i) Establishment of a Steering Committee as the secretariat to draft a new policy towards the prohibition of single-use plastic, including coordination of existing policies; and (ii) Implementation of studies and questionnaires to obtain the views of the public on the proposed implementation of the policy and measures. At present, through the Penang Green Council, we have begun this by telephone, by meeting people and asking for feedback and so on. (b) Second Phase (i) The process of drafting Local Authority By-laws to lay the foundation of authority for Local Authorities as the implementing agencies of the policy and measures; (ii) Preparation of guidelines for compliance and enforcement; and

(iii) Presentation of the draft policy and measures to the State Executive Council Committee on Environment and the State Executive Council Committee on Local Government. (c) Third Phase (i) Briefings, publicity and stakeholder engagement processes, namely State Assemblymen, the public, Non-Governmental Organisations (NGOs), food and beverage operators and the plastic industry. (ii) Refinement of the draft policy and measures by taking into account input from the relevant authorities; and (iii) Presentation of the final policy and measures to the State Authority (PBN) for approval for implementation and enforcement.

The process of preparing this policy and measures will take six months, from July until December 2018, and is proposed to take full effect on 1 January 2019, beginning with the No To Plastic Straw Policy. Simultaneously with this process, the State Government, through the Penang Green Council (PGC), has begun a soft approach by approaching the public and food and beverage traders to provide information and awareness so that they support the No To Single-Use Plastic policy in general and the No To Plastic Straw Policy in particular. Besides that, this policy and measures have indeed been planned to be started through official State programmes as an example to all the people of Penang. We have indeed been in contact with the Plastic Manufacturers Association, and official discussions and meetings will be held once this draft is prepared. I earnestly appeal to all ADUNs, please take the lead and ownership, where at certain events avoid using water bottles or the like, take a tumbler, like the Honourable Member for Padang Kota, so that this can be an example and attract the attention of the public that we are committed, ADUNs are committed, that is, not only the Government ADUNs but including the opposition ADUNs, because when we discuss the environment, let us be united to save this earth. There is only one earth, mother earth... (Desk-thumping in the House.)

The issue of channelling the collection of funds from the no free plastic bag programme for environmental programmes, as proposed by the ADUN for Bagan Dalam. The Honourable ADUN for Bagan Dalam has requested that the State Government channel the funds collected from the No Free Plastic Bag Programme to be used for welfare programmes and environmental sustainability. For the information of the Honourable Members, the original principle and purpose of implementing the No Free Plastic Bag Programme was to create awareness and not to fill the State Government's coffers.

Therefore, a decision has been agreed upon at the State Authority level that all proceeds collected from the No Free Plastic Bag Programme must be utilised for all the people of Penang through welfare programmes. That is to say, when we run this programme, we are not collecting funds, no. Rather, it is more about awareness. I also thank all ADUNs, because the ADUNs have helped to create awareness, so that the State of Penang is the only state in the whole of Malaysia that has a 365-day no free plastic bag day. I congratulate everyone, especially the people of the State of Penang, because in several instances, we carried out investigations and so on, that all the people of Penang support this programme and we have achieved it. There are also people who ask me why, still, one sees people taking plastic bags. Most of them are from other states. And here I also want to tell my friends from the Opposition. This programme was nearly sabotaged by the Barisan Nasional Government, because when we collected, we had a way to collect funds that could be used, while the Federal Government, if in Penang, they put it on Saturdays and Sundays, and the method for finance, they did not allow it to be channelled according to the measured value, and here there is one company, a multinational, which is one of the biggest so-called supermarkets, hypermarkets. They did not want to channel it to the State Government; they sent it to Kuala Lumpur because the policy of the Federal Government was that they could use that money however they liked. Therefore, I thank God now that the Federal Government, which is also Pakatan Harapan, has made the finances return to the State Government in a better way. If not, we will take action against them. Many of these supermarkets and hypermarkets. And here I have also informed this august House that for the no free plastic bag day, a review will be carried out now, because the plastic used at supermarkets, when we say no free plastic bag or Single-Use Plastic, is now too, too thin, fifteen (15) microns, so the possibility is that we give it a thickness of forty (40) microns, and also, at twenty sen, it will increase to one, at a rate that will be agreed upon by the committee. On the matter of the weather forecast application raised by the ADUN for Pulau Tikus, I thank him a thousand times, because he is the one ADUN who constantly, every day and every night, informs all ADUNs of any changes, so that they are prepared to face any disaster. He is not a bomoh (medicine man). The Honourable ADUN for Pulau Tikus has suggested that the State Government be more prepared and alert now, given the current unpredictable weather, and use alternative weather forecast applications and weather apps, and not depend solely on weather forecasts from the Meteorological Department only. There is indeed an official department at the Meteorological Department, so we have to follow it, but here the way to supply information is to be checked again. Because I here acknowledge that on 4 November, the forecast was indeed quite accurate, very free size, because it gave information as a report after the event. It is not a forecast, it is just reporting, because it happened at 4.00 in the afternoon, and at 9.00 at night we were informed that such a situation would occur. But I do not blame them, because the senior officers did not monitor it. Therefore, as information for the Honourable Member, following a series of disasters that have struck the State of Penang, the Penang State Government administration always endeavours to ensure that disaster management, whether floods or otherwise, if it occurs, will take into account preparedness among the infrastructure coordinators of the early disaster warning system. Indeed, after the disaster warning, that is on 4 and 5 November, we received offers from private companies and also foreign governments, which would help the State of Penang to establish a system or a double protection system from Hong Kong and from Siam. This is free, but when we announced it, we would study it, we were given a warning by the ministry, that is to say, not allowed. The need for alternative applications for an early disaster warning system besides the existing system at the Meteorological Department was raised previously by the former YAB Chief Minister to the Federal Government. Moreover, the State Government has also received proposals from the private sector that agreed to cooperate in developing such an application. However, this matter had to be postponed because there was no agreement from the relevant ministries involving the Federal Government previously. Nevertheless, this matter will be brought back to the negotiating table with the Federal Government, Pakatan Harapan, to discuss it again, that is, I believe that this, to be discussed again, and the Honourable Member from Pulau Tikus is also a member of the panel appointed to conduct a review. The issue regarding poachers raised by the ADUN for Bagan Dalam. The Honourable Member for Bagan Dalam, in his debate, requested that the Perhilitan (Department of Wildlife and National Parks) take steps to arrest poachers who threaten protected wildlife. In response to this issue, the Government, through the State Perhilitan Department, takes the issue of illegal hunting involving wildlife seriously. In this regard, various enforcement actions have been carried out by the department to eradicate such activities. The Perhilitan Department has also declared 2018 as the Year of Combating Snares. Therefore, eighteen (18) snare and enforcement operations have been carried out in hotspot areas and the Penang National Park. For information, up to July 2018, a total of seven (7) cases involving the possession of wildlife without licence or special permit were charged in court and were fined or imprisoned. Human-wildlife conflict, the ADUN for Sungai Acheh and the ADUN for Sungai Dua, where is Sungai Dua? The Honourable ADUN for Sungai Acheh and the Honourable Member for Sungai Dua raised the issue of conflict between humans and wildlife, particularly involving monkeys and wild boars. For the Honourable Member's information, the Penang Perhilitan Department, from time to time, takes action on complaints of human-wildlife conflict in the State of Penang. Integrated operations together with other agencies continue to be carried out to eradicate crop pests. In 2017, a total of nine (9) integrated operations were implemented. Next, from January to July 2018, a total of four (4) integrated operations were carried out, successfully implemented according to, through the records of the Penang Perhilitan Department, from January to July 2018, there were three (3) new complaints of monkey species and seven (7) new complaints of possible wild boar species from the ADUN for Sungai Dua. Action has been taken regarding overcoming this conflict problem and setting traps at the complaint locations... (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

The Honourable Member wishes to intervene.

Phee Boon PohDAP · PHSungai Puyu

Ya.

Satees A/L MuniandyDAP · PHBagan DalamEN

The Honourable Member asked for the floor. The Honourable Member spoke about PERHILITAN and also about poachers. I do not know the exact Bahasa Malaysia term. Poachers is a phenomenon that is growing, where wild animals are caught and sent out of the body of the animal after they are killed; they are sent overseas. Because of this, the number of our wild animals is falling. Next, in the Northern area, and also after the area of the upper Muda, the Sungai Muda, there is a type of wild cat. Indeed, I heard that in Penang they are caught and often smuggled through Thailand to China.

PERHILITAN must take this problem seriously, because I think Malaysia is still behind in protecting animals or wildlife, including in other states. In Kelantan, a tiger was hit by a car and an elephant was hit by a car. Although Singapore has no wild animals, it can still build a bridge for wild animals to cross the road. We are a country so rich in wild animals, yet we cannot do the same. And another matter is about the monkeys just now: they are defined as a nuisance to crops. I hope PERHILITAN or anyone else will not shoot these monkeys. Catch them and, indeed, these animals were already present in that area. When humans go and develop, or build our development that encroaches on their area, and when they come back to their original area, we shoot them. This is unfair, and I hope they will be caught and released into the forest. I heard that at Penang Hills, at Bukit Bendera, nearly 200 monkeys were once killed. So, I think, from then until now, roughly six (6) years ago, I think this matter needs to be stopped, to show a little human compassion towards animals as well. That is all, Honourable Member.

H’ng Mooi LyeDAP · PHJawiEN

Excuse me, Honourable Member. Mr Speaker, I certainly do not agree with what the Member for Bagan Dalam has said, that the Department of Wildlife and National Parks (PERHILITAN) cannot shoot. We know well that monkeys or macaques are a nuisance that is occurring very seriously in the Jawi state constituency. I can give areas such as Kampung Sanglang, such as Taman Cenderawasih, Kampung Arjuna, and we have carried out two (2) operations, namely in the month, the month of April or the month of March. For the first operation, previously we used our allocation and bought bullets for the Department of Wildlife and National Parks to carry out the operation. Indeed, if it is bad, they came to visit and meet with the residents around. First round, we managed to shoot 75; second round, just recently, we shot 45 in 10 areas. But complaints are still coming in until today, that the monkeys can break roofs, can even lift up roofs or antennas, and all over the area they are broken. I think the Bagan Dalam area has never received complaints like this. Perhaps you do not yet know how serious what is happening in the Jawi area is. So, I hope that, if possible, I support the Department of Wildlife and National Parks to continue.

Satees A/L MuniandyDAP · PHBagan DalamEN

The Honourable Member for Jawi, the Honourable Member for Sungai Puyu asks for the floor. In fact, he can shoot, using tranquilliser darts. We have already approached the area ground; even stray dogs we do not shoot. This is wildlife; stray dogs, meaning street dogs, we also do not shoot. My friend from Jawi here, for five (5) years with me in MPSP. He knows how I object to any cruel activities such as killing dogs, cats, or any animal.

Deputy Speaker of the HouseEN

Jawi, Jawi, please sit down, State Assemblyman (ADUN) Jawi, please sit down.

Satees A/L MuniandyDAP · PHBagan DalamEN

Any cruelty like this. I hope, if he shoots using tranquilliser darts, send them to the area. We have Bukit Panchor, also in Jawi, Nibong Tebal, Sungai Bakap; you can send them into the forest. We have many permanent forest reserves; you can send these wild animals to the forest. Do not kill them. I think it is not fair, our Malaysian people's thinking is still immature. Just a little, they want to kill animals. Oh dear… (interruption).

H’ng Mooi LyeDAP · PHJawiEN

Excuse me, Mr Speaker. I think perhaps the Bagan Dalam area has never received complaints like this, until the monkeys can come to the house every day, and when they see someone doing exercise, they can follow along. Then they can break all the roofs, and a row of terrace houses has had the ceilings above them opened, and when it rains, everything gets wet. So I ask that the Department of Wildlife and National Parks, besides adding allocations to set traps and also to continue operations to shoot monkeys, extend this to the hotspot areas that always receive such complaints.

Deputy Speaker of the HouseEN

Honourable Members of the Jawi constituency may sit down; the Honourable Member for Sungai Puyu may continue.

Phee Boon PohDAP · PHSungai PuyuEN

Yes, for the information of the Honourable Member, at present there are two approaches, or Standard Operating Procedures (SOP), used by the Department of Wildlife and National Parks (PERHILITAN) to control conflict between humans and animals. The first approach is to conserve these animals properly according to their existing habitat, without involving disturbance or interference by humans. Second, the approach is to reduce conflict arising from clashes between these animals and humans. Therefore, based on the SOP used by PERHILITAN, it is believed that conflict between humans and these animals can be minimised. There are indeed places such as in Kuala Muda, in Kuala Muda, where we also have control under schedule, and also at one time I gave permission that, not wanting it, by whatever this Member for Bagan Dalam wanted to eliminate, because there was one death. A death during the night, when a driver was coming home riding a motorcycle, suddenly there was a group, a family of wild boars crossing the road, and he collided with them and died there. So, I had no choice, because a life had been lost, it had to be eliminated, had to be eliminated. Those that can be relocated will be relocated. But look, the situation is not that all are shot, nor are all relocated. Look, and here I extend a thousand thanks to the Forestry Department. The Forestry Department has already run one, one schedule, one, what is this, planning, where fruit is fed in certain forests so that they have food. And I appeal that there are certain places, like at To'kun, Cherok To'kun, where there are still people who want to be good people and give food to the monkeys. When they give the monkeys food, they also give food to the stray dogs there. Therefore, it has attracted such problems for the people there. So, at one time I closed Cherok To'kun for one month so that they would not have food, and my friend monitored it closely so that no one went to give food. I had to settle the conflict between the human beings and animals, and after that, indeed, many of those monkeys ran into the forest to look for food. If people give them food, they do not want to look for food. They just sit there waiting; if you do not give, they get angry, and without realising it they will disturb you. So, these are the things to be taken into consideration.

H’ng Mooi LyeDAP · PHJawiEN

Dato' Yang di-Pertua, there is only one thing I am worried about, because complaints about monkeys are indeed serious in the Nibong Tebal area, to the point that the monkeys enter houses, and a baby, a four (4) month old baby, four (4) months, and so the monkey went and picked it up to disturb it. Another thing… (interruption).

Deputy Speaker of the HouseEN

And the baby, yes…

H’ng Mooi LyeDAP · PHJawi

Bayi, bayi.

Deputy Speaker of the House

Bukan bai’e.

H’ng Mooi LyeDAP · PHJawiEN

So, the second matter: complaints were received at Sekolah Menengah Kebangsaan Jawi, where the principal told us that they had prepared 200 packets of instant noodles for the students, but when the monkeys entered the classroom, in one night everything was finished. So, this is a serious matter, and perhaps also, once the Department of Wildlife and National Parks has caught that monkey, perhaps we can send it to Bagan Dalam, like the forestry place where they watch the birds. Perhaps that area is more suitable; I think it is better for us to release the monkey there.

Deputy Speaker of the HouseEN

The Honourable Member for Sungai Puyu. Continue.

Satees A/L MuniandyDAP · PHBagan DalamEN

I ask for the floor.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

Please give the floor, just a little.

Deputy Speaker of the HouseEN

The Honourable Member for Sungai Puyu, continue. If we talk about monkeys and wild boars, we will never finish.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

I ask for the floor from the State Assemblyman for Sungai Puyu.

Satees A/L MuniandyDAP · PHBagan DalamEN

He said indeed Bagan Dalam already has monkeys, past the Tunku Abdul Rahman Bridge, by the roadside there are monkeys. I also sometimes give food to those monkeys, by the roadside. That is not a wrongdoing… (interruption).

Deputy Speaker of the HouseEN

Sit down, sit down. The Honourable Member for Sungai Puyu, continue.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

I ask for the floor, Honourable Member.

Satees A/L MuniandyDAP · PHBagan DalamEN

I ask the State Assemblyman for Sungai Puyu to investigate whether the State Assemblyman for Jawi has obtained permission to shoot.

Deputy Speaker of the HouseEN

I said Bagan Dalam, Bagan Dalam, sit down.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

Seriously, I ask for the floor.

Deputy Speaker of the HouseEN

We give one minute to Sungai Acheh.

Zulkifli Bin IbrahimPKR · PHSungai AchehEN

Okay, thank you, Honourable Member for Sungai Puyu. Could you not suggest, as proposed yesterday, that PERHILITAN may be able to cooperate with the Village Development and Security Committee (JKKK), whether traps are provided, or also anything, whether fruit, or leftover watermelon, or leftovers from the plantation, to make catches and cooperate together with the Department of Wildlife and National Parks, and the JKKK involved, especially in areas like Sungai Acheh, the Jawi area, Sungai Dua, which are focal areas that have become the nuisance between monkeys and humans.

Phee Boon PohDAP · PHSungai PuyuEN

Yes, we are willing to cooperate with anyone if there is any information, and if there is a need for any assistance to PERHILITAN, please let me know, and I will handle it there. As for wild boars, in the survey at Sungai Acheh there are not so many, and we have to balance out, because Sungai Acheh is also close to the forest, and can reach to, to Bukit Panchor and others. There are also places where, sometimes, tigers come to eat durians too.

Deputy Speaker of the HouseEN

Honourable Member for Sungai Puyu, please summarise.

Phee Boon PohDAP · PHSungai PuyuEN

I have to give an explanation because the question has been asked.

Deputy Speaker of the House

Okey sambung.

Phee Boon PohDAP · PHSungai PuyuEN

That is my responsibility here.

Deputy Speaker of the House

Sila sambung.

Phee Boon PohDAP · PHSungai PuyuEN

The Honourable State Assemblyman for Bagan Dalam has applied that the mangrove swamp area along the coastline from Penaga to Teluk Ayer Tawar not be developed, not be built upon, and that it be made a Ramsar site. In reply, my written answer to the Honourable Member for Bagan Dalam: at present, the State Government has no plan to make the mangrove swamp area along Teluk Air Tawar, Penaga, a Ramsar site. However, the State Government, through the Penang State Forestry Department (JPNPP), is taking action to gazette 200 hectares of mangrove swamp forest on State land in Penaga, and is not involved with developers. The area of permanent forest reserve at that level, we say, we do not propose it as Ramsar, but it will become a permanent forest reserve. It is not only Penaga; it will extend to, what is this, extend to Kuala Muda, it has been proposed. Okay, Teluk Bahang also has a question regarding peppa; there is Teluk Bahang. No, there is no, let us skip. Teluk Bahang also asked about the National Park, I thought of the national park, but because the causeway has been explained by the doctor, the Honourable Member for Seberang Jaya, I went straight to the National Park. The thunderstorm incident on 15 September and the storm on 4 and 5 November 2017 indeed damaged much equipment at the National Park. The repair allocation and the calculation received following the storm incident at the National Park on 4th November 2017, we gave a little to them to carry out cleaning, and this cost is roughly RM50,000. The approach and rate implemented by the Penang National Park authorities to tackle the rubbish issue at the National Park are as follows. We appeal that all visitors and tourists who enter the Penang National Park must bring out the rubbish they bring in, because when they enter there, afterwards they throw rubbish. That is one cause that will damage the national park. Control and monitoring carried out by rangers and tour guides on tourist activities, I mean those people, routine and random inspections at the control posts by staff of the Penang National Park. Daily inspection by the cleaning contractor appointed by the National Park authorities in the control area from Pasir Pendek to Sungai Tokun. CSR programmes such as Beach Clean Up are always carried out, involving members of the public from companies and factories, school students and IPTs, and government agencies, to tackle the issue of rubbish from the sea that is on the beach. Here I also want to inform that the issue of unregistered boats entering the National Park area is with boats coming from boat tour operators in Batu Feringghi who take visitors from hotels around directly to Teluk Duyung, Monkey Beach is owned land. In addition to periodic briefings by the Penang National Park to boat operators, monitoring is carried out by the Malaysian Civil Defence Force (APM) and the Marine Department. There is indeed a small amount of private land within the National Park. When they go to Monkey Beach, they go there, so it cannot be controlled. If I may, I ask that they be brought under the control of the National Park. And additional information: the National Park now needs to repair the jetty, the jetty problem raised by the Honourable Member for Teluk Bahang. All operating expenses of the Penang National Park are funded from the Federal Government allocation, because for several years there has been no money, no allocation from the Federal Government, so they could not clean and do repairs at all. We must be grateful to God, now it has changed, and they have submitted an application to obtain, to receive an allocation, and the application for National Park allocation to the Penang State Government for repair and upgrading work and visitor facilities at the National Park has a total of RM20,400,000. Here, the number of registered boat operators is 43 registered boat operators who have permission to operate within the National Park area. There is only one weakness; I have asked that they cooperate to prepare a manifest, the manifest of which boats they bring there, and if all have departed, for information. So this is for security control, and also, if anything unwanted happens, at least we can know who is involved.

Dato' Yang di-Pertua, I know, it is already seven o'clock… (interruption).

Deputy Speaker of the House

7.15 pm.

Phee Boon PohDAP · PHSungai PuyuEN

Honourable Members, in closing, I would like to extend a thousand thanks to the parties, including departments and government agencies, NGOs, as well as communities and private institutions, who assist the State Government in implementing the Caring Society and Environment Community Programmes for the welfare and prosperity of the people of the State of Penang. I also wish to record the assistance channelled to the State Government during difficult times, namely when disasters strike. May cooperation between the government and society always help the State Government in improving services to the people of the State of Penang. To conclude my speech, I summarise briefly, and I thank the Honourable Members who raised questions and related issues. The matters that have been raised will… (interruption).

Deputy Speaker of the HouseEN

Thank you, Honourable Member for Sungai Puyu.

Phee Boon PohDAP · PHSungai Puyu

Belum habis.

Deputy Speaker of the HouseEN

The Honourable Member for Sungai Puyu.

Phee Boon PohDAP · PHSungai PuyuEN

Just a little more. The matters that have been raised will become a catalyst for me to work harder and more diligently to add value and further strengthen the quality of the Welfare, Caring Society and Environment portfolio. In conclusion, I wish to extend greetings on celebrating the 60th Independence Day to all Malaysians, in general the people of Penang in particular: Sayangi Malaysiaku. Before I say thank you, I also want to inform here. For the first time in this distinguished House, in ten years as opposition EXCO I did not rise and walk out. I thank you because for ten years… (interruption).

Deputy Speaker of the HouseEN

Thank you, Honourable Member. The Honourable Member for Sungai Puyu, Honourable Members of the House, the House is adjourned and will reconvene at 8.00 pm.

The House was adjourned at 7.15 pm.

The House resumed at 8.00 pm.

Secretary of the HouseEN

Honourable Members, the Honourable Deputy Speaker of the State Legislative Assembly.

Deputy Speaker of the HouseEN

Honourable Members, we are in the winding-up session. The Honourable Member for Padang Lalang is invited to speak.

Chong EngDAP · PHPadang LalangEN

Deputy Speaker, first, I would like to express my heartfelt thanks for taking the time to take part in the winding-up of the debate on the speech of the opening of this sitting of the House. First, I would like to congratulate all the Honourable Members in this House for having been chosen by the people to represent their interests, especially the Honourable Members who are in this House for the first time (Members thump desks). I also feel that their debates were indeed good and of quality (Members thump desks), so I hope they will keep it up. I thank all the Honourable Members who have taken part, with commitment, in the debate involving the Portfolio of Women and Family Development, Gender Inclusivity and Religions Other than Islam. So I would like to thank Honourable Sungai Pinang and Honourable Seri Delima for raising the issue of sexual harassment. For the information of this honourable House, sexual harassment is a criminal offence that must be given serious attention. As new cases have begun to emerge, the latest in the public health sector, sexual harassment is a crime caused by power imbalance (with permission)…power imbalance between the perpetrator and the victim. There are several types of sexual harassment that are not commonly known, such as visual, verbal and physical harassment, of which many people know only the physical form. Sexual harassment reduces the quality of working life for the victims. It affects the welfare of workers and affects the reputation of the firms involved. All of this has a negative impact on the productivity of these workers at the workplace. For the information of this honourable House, matters relating to sexual harassment are provided for under the Penal Code Act 574, the Employment Act 1955, Act 265, the Industrial Development Act 1967, the Occupational Safety and Health Act 1994, and administrative regulations such as the Code of Conduct or Code of Conduct for Public Officers 1993 and the Guidelines on addressing sexual harassment in the workplace. According to statistics from the Ministry of Women and Family Development, from 2013 until May 2018, a total of 1,340 cases were reported. However, this figure is certainly much higher if cases that were not reported are included. Our culture of 'saving face' and 'patience' makes this issue even more serious. Furthermore, victims who do not report or do not take action do so because it is difficult to prove the case (with permission)…burden of proof. Some are afraid of losing their jobs or of being belittled by colleagues.

Therefore, a specific law on the prevention of sexual harassment needs to be enacted, and the Penang State Government suggests that the Federal Government introduce a Bill on the prevention of sexual harassment to tackle the problem of sexual harassment or, at the least, to deter perpetrators so that they think twice or three times before they do that. For victims of sexual harassment, they must be given appropriate support and protection to come forward and lodge complaints with the authorities. They must not be humiliated and silenced from lodging complaints. The law to be enacted must provide assurance of safety to complainants, so that appropriate action can be taken against the perpetrator. I think many Honourable Members here may also think that sexual harassment is a women's issue, actually it is not. The victims also include males, especially young boys. There are some cases that we have picked from the newspapers only, yes, on 9 October, there is The Star Online, "male teacher charged with sexual assault on five primary school boys", a teacher, yes. And here also, Lenggong teacher faces 19 more charges of sexual offences, this time against three male students. We greatly respect teachers, but he also did that. Tahfiz teacher arrested for performing oral sex on students, a tahfiz teacher. Former religious teacher charged with molesting 10 male students, this one is Bernama, 15 May this year. Sexual assault by ustaz, students offer to testify, this happened in Penang, 25th July this year. So, this is only to show that sexual harassment also happens to young boys. So this is not…not a specific gender, but it is a power inequality. Whoever is more powerful will bully those who are weaker. That is all. This is a behaviour of bullying. So it is important for us to teach our children, regardless of whether they are girls or boys.

Daniel Gooi Zi SenDAP · PHPengkalan KotaEN

Seeking clarification. Thank you, Honourable Padang Lalang. We are discussing this issue of sexual harassment, and here I also want to draw the attention of this honourable House to a statement issued by the Member of Parliament for Tasek Gelugor, who is also a former Member for Permatang Berangan in this honourable House, in which he made a statement that, if we want to overcome the problem of rape, which is one of the problems of sexual harassment too, he proposed that the rapist should marry the rape victim. Given this issue, and also because all our women representatives are with us in this honourable House, we would like to get the views in particular from Honourable Permatang Berangan on this issue. Honourable who is still the Member of Parliament for the Tasek Gelugor constituency, he is still the Member of Parliament in that area, and so certainly, especially Honourable Permatang Berangan, I would like to get the Honourable's view regarding this issue. Thank you.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Thank you, Honourable Pengkalan Kota, Mr Speaker and also Honourable Padang Lalang, I request to give an explanation. In my view, when the Member of Parliament for Tasek Gelugor made that statement, he specifically referred this legal provision to the Muslim community, for Muslims, and did not include non-Muslims, and the provision for the minimum age of marriage for men is 18 years and for women 16 years, and permission is also given to marry below 16 years if the parties agree with the permission of the Syariah judge, and for the cases referred to, it is only for certain specific cases. Not for all rapists, meaning when sex occurs between a male and a female who are under age, and in the category where a woman is under 18 years old, then the man who performs the sexual intercourse is categorised as a rapist. That is in the civil law provisions. But for me as a Muslim, and we believe that the law is established, it is certainly not allowed if the perpetrator before marriage, but when certain cases occur that were referred to by the Honourable Member of Parliament for Tasek Gelugor, it is for cases that occur voluntarily. Meaning, the underage girl has had sexual intercourse with her partner voluntarily, but since she is under age, so to ensure that both parties settle the case themselves, meaning by agreement of both parties, they can negotiate to..(interruption).

Syerleena Binti Abdul RashidDAP · PHSeri DelimaEN

May I interrupt. Give way…(interruption).

Deputy Speaker of the HouseEN

Give the explanation first, later you can finish it first.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Let me explain first, later if..perhaps that day when Honourable Seri Delima was speaking, I was outside because I went out for a break. So, what I mean here is when there are only certain cases. For the civil charge of having sexual intercourse with a minor, it is indeed charged as rape if there is a complaint, but when there are certain cases where the couple did so voluntarily. So perhaps for the Malay community, it is common to settle cases when they happen in the village and want to settle the case, so..it is clear, so I think Honourable Padang Lalang also understands, so this time I think it is not merely that we want to propose that all rapists can marry the partner they raped.

Chong EngDAP · PHPadang LalangEN

Okay, it is clear. Thank you, Honourable Permatang Berangan. This reasoning has a danger. There is a danger in this explanation, because we know for example the recent case, he was a 41-year-old man, he wanted to take this girl, 11 years old. As his third wife. This is the danger. Meaning, he can be grooming her, he can win her heart, gain her affection in small ways. This is called grooming. And as children, they cannot make such decisions, firstly. Secondly, saying that after there is sexual intercourse then they can be married off. This also has its danger, because if that is the case, anyone, usually men, if he likes the girl and the girl does not like him, but he can force her. Later I will finish..(interruption), he can force her. Rape her. But after that, he says it can be settled by marrying her. This is the danger of this approach, and I think at this time we all know that those under 16 are still small, have not even finished secondary school yet. How can they get married? I think, long, long time ago, in Confucius' time, it was also like that. Chinese people also said that if a person had sexual relations with anyone before marriage, they were executed.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

I seek to interrupt.

Chong EngDAP · PHPadang LalangEN

Wait. But now it is no longer accepted, and I have also handled a case where the female student was in Form 4, she was pregnant. She wanted to get married but her father said he did not want to let her marry because he also knew that her boyfriend was only 17 years old. He also had no job, could not even support himself yet, so how could they build a household? This marriage will certainly not be happy. She will end up in divorce too…(interruption).

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

May I interrupt.

Chong EngDAP · PHPadang LalangEN

Generally what we say is that we should not allow any children…(interruption).

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Honourable Padang Lalang, may I interrupt?

Chong EngDAP · PHPadang LalangEN

Wait, wait, let me finish first. Small children must not be allowed to marry. (Members thump desks) At least 18 years old. Even 18 years old is still considered young. Okay.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Honourable Padang Lalang, this case applies to Muslims. Meaning we have a provision from Islamic law that gives permission to children who have reached akhil baligh and voluntarily, and with the permission of the wali. Meaning even though they are under 16 years old for women and also 18 years old for men…(interruption).

Chong EngDAP · PHPadang LalangEN

I understand that…I understand that. I have indeed studied this situation.

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Meaning if it is for the Muslim community, it means permission is given through the provisions of syariah law, so with the permission of the wali and also when the conditions are fulfilled, they are entitled to…(interruption).

Deputy Speaker of the HouseEN

Asked to sit down, alone.

Chong EngDAP · PHPadang LalangEN

I think parents cannot be given permission to, cannot be given the responsibility to give this permission, because it is the parents who should protect the interests of their child and not just marry them off.

Deputy Speaker of the HouseEN

Honourable Bayan Lepas, Honourable Bagan Dalam, Honourable Pengkalan Kota and

Honourable Permatang Berangan, this is the Padang Lalang floor.

Chong EngDAP · PHPadang LalangEN

I think I will give it to Bagan Dalam.

Satees A/L MuniandyDAP · PHBagan DalamEN

Thank you, Honourable Padang Lalang. I want to ask my friends from over there to be able to answer, Permatang Pasir and also Bayan Lepas, about me being told by one of my friends after the Leader of the Opposition that day, he raised the same issue when Seri Delima raised this issue, when I left the House he told me that what the Leader of the Opposition said is indeed from the old days, he said this law is not a law that..I do not understand, I ask for an explanation, can my fellow Muslim friends explain it to me.

Deputy Speaker of the HouseEN

Honourable Bagan Dalam, if that is so, then we give it to…(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

No no, Deputy Speaker, I want to finish my question first.

Deputy Speaker of the HouseEN

You said about religious groups or we give…(interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Let me finish my question first, he will give the explanation. Okay. He told me this is not a fixed law like the law that every Muslim must pray 5 times a day, he said this is not a fixed law like that.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

A Qat'ie law, can you say it?

Satees A/L MuniandyDAP · PHBagan Dalam

Qat’ie.

Muhammad Faiz Bin FadzilAMANAH · PHPermatang PasirEN

Ha, it is nice to say it too.

Satees A/L MuniandyDAP · PHBagan DalamEN

That is what I was told. So I want to understand where..how we can use it if it is not Qat'ie, can it be violated. That is my question.

Muhammad Faiz bin FadzilAMANAH · PHPermatang PasirEN

Explanation. Okay. That is child marriage, with permission Deputy Speaker, both laws have provisions for it. Both on the Muslim side, under civil family law, and also in syariah there are provisions. Under civil law for non-Muslims, any female under 18 who wants to marry must obtain permission from the Menteri Besar or the Chief Minister, and in syariah, permission from the court is required for those under 16. The question that arises is not a legal question. In Islam, indeed there is no age limit, but we as a government have a responsibility towards the people. In the process of building a civilised nation, a progressive nation, a nation with integrity, to build this nation is not only in terms of physical buildings, not only in terms of physical factories, but we must build the people with mentality, thinking, and education, which is the most important. So what we want is for every citizen to receive a complete education, at least SPM.

That is why I want to request an explanation from Honourable Padang Lalang on whether the Penang State Government will raise the age limit from 16 to 18, because we need to deal with this issue according to the issue. If there are sex problems among students or minors, we educate them with sex education. Do not be too pessimistic about sex education. When talking about sex education, we will imagine things that are not good, whereas for the information of Deputy Speaker, if we studied in a religious school, the core of religious schools is Arabic, and we will learn about Fiqh-Munakahat, that is Fiqh of Marriage. Why is it allowed to learn about Fiqh of Marriage in religious schools but in ordinary schools knowledge of marriage is not taught? This creates discrimination. Whereas the ones who are playing up this issue are religious people, yet religious students can learn about marriage. So for me, if we have a problem with sexual activities among minors, we educate them, and with the Government of Selangor's intention and also at the Federal level to raise the age limit to 18, does the Member for Padang Lalang agree that this is also a warning to children out there, to teenagers out there, that they cannot engage in sex because if they engage in sex, they cannot marry. If they know they cannot marry, because they are minors, perhaps they will not engage in sex. So I request an explanation on whether the State Government will raise this age limit.

Chong EngDAP · PHPadang LalangEN

Thank you, Permatang Pasir. Indeed the EXCO meeting has also directed the Legal Advisor to study this law. How we can change it so that the marriage age is raised from 16 to 18, but I would also like to hear all the Honourable Members here, especially Permatang Berangan, whether Permatang Berangan can support this shift. Although they say there are syariah laws and others, but I think that law also follows the times and follows the needs of this time, and uses our common sense that we understand children who cannot yet look after themselves, who are not yet responsible for themselves, should not be allowed to marry. So I hope all Honourable Members can agree with this point.

Azrul Mahathir Bin AzizAMANAH · PHBayan LepasEN

Thank you, Honourable Padang Lalang, but I would like to interrupt. As far as Honourable Padang Lalang is aware, how many cases like this are there? A 41-year-old marrying an 11-year-old.

Chong EngDAP · PHPadang LalangEN

If we say 11 and 41, there are detailed cases of this, but there are many under-age marriages. I do not have statistics here but there are indeed many. So I agree with what the Member for Permatang Pasir said earlier, that if we have concerns, or because sexual relations have occurred, so we marry them off, I think we are taking the easy way. We take it easy way, we don't care. We don't care about 50 years from now, what their life will be. If she is 11 years old, 15 years old, she is not yet mature, she does not go to school, how will she get a job…(interruption).

Nor Hafizah Binti OthmanUMNO · BNPermatang BeranganEN

Honourable, I request an explanation. Honourable Padang Lalang. I do not reject it if this is a proposal for improvement and also for protecting the welfare of women and society, but I just want to inform that earlier there was a statement from a friend of Honourable Pengkalan Kota about the statement of the Member of Parliament. Only I feel here, if there are proposals for the good of educating society and safeguarding the well-being of children, that can be discussed.

Chong EngDAP · PHPadang LalangEN

I understand. But I will support it if there is this change, or raising the age of this marriage.

Mohd. Husni Bin Mat PiahPAS · PNPenagaEN

May I have the floor? Thank you, Honourable Member for Padang Lalang. Deputy Speaker, I would like to interject on the matter raised earlier by our EXCO regarding marriage or the issue of underage sex, and I also agree with the views of the Honourable Member from Permatang Pasir. This matter must be viewed from many angles, not just one. From one angle, we need to make rules or regulations and enforce the law, and from another angle it must also be seen, as was mentioned earlier, in terms of educating these children, because if we think about it, this kind of marriage is indeed not suitable. But in my religion, I think other religions also have their considerations, and Islam has its own ruling. And I see that in our country, with the statistics I have, there are indeed quite a lot of cases reported for 2017 alone. That means last year, the number of underage child marriages was, or the number of cases was, 1,845. Of these 1,845 cases,

those involving Muslim children numbered 877, and non-Muslim children numbered 968 cases, involving various ethnicities including Chinese and Indians. If I may cite the statistics here, of the Chinese there were 384 cases, Indians 122 cases, Sabah ethnics 31 cases, Sarawak ethnics 268 cases, and Orang Asli in Peninsular Malaysia 185 cases, and also other ethnicities 18 cases, bringing the total to 968 cases. So we need to look at all of this and at what is done for future generations, for the common good, and we want to also address the matter of underage marriage. But in Islam, the ruling is one matter, and from one angle, the ruling, although it permits it, as mentioned earlier by my fellow Member for Permatang Pasir, but for that permission it must fall under the Syariah Court. That means if the court does not permit it, even though the ruling allows it, that marriage absolutely cannot take place. Thank you.

Chong EngDAP · PHPadang LalangEN

We all agree that we must provide education and also prevent sexual harassment of children. The State Government has published a book, "Educate your children to protect themselves". This is body safety education. This is in English, but now it is being printed in Bahasa Malaysia, Tamil and Mandarin. So I hope all the State Assembly (KADUN) members, all the YBs, will take one copy or more, it doesn't matter, and the State Government's intention is for every parent to receive one copy so that parents themselves can read it and teach their children how to protect themselves.

Ong Ah TeongDAP · PHBatu LancangEN

YB Padang Lalang, may I have the floor to interject briefly. I am not a Muslim, and I do not know much about the religion of Islam, but I believe in "Belief in the King and Country". What Selangor has done, the Sultan has supported raising the age to 18. So, I do not understand, but I think that as a Sultan or King he is the head of religion, as the head of the Islamic religion. So, I think I believe in what the Sultan has agreed to. That is my support.

Chong EngDAP · PHPadang LalangEN

Thank you. Indeed, the Penang State Government is also studying changing this marriage age… (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

I think Honourable Member for Padang Lalang, if the amendment is brought, I think Penaga and my colleagues will in any case support it. I believe.

Chong EngDAP · PHPadang LalangEN

Thank you. Thank you. YB Sungai Pinang also touched on single mothers at PPR Jalan Sungai who were given the opportunity to generate income through a skills training class in bread making. I would like to stress that not only single mothers, but women in general, really need opportunities to learn how to generate income. But I think Sungai Pinang has shown a good example. And I hope other Honourable Members can also do the same. Empowering women to generate income is the most effective and sustainable strategy for bringing positive change to women themselves, and even to their families in terms of purchasing power, or (with permission)… purchasing power. The effects are that families feel less stressed and instead become happier and more harmonious. In fact, it will raise their socio-economic status and free them from the shackles of chronic poverty. For the information of this august House, the Penang Women Development Corporation (PWDC) has introduced the Community Economic Transformation Project under the Women's Economic Empowerment Programme, or WEE. It is a project specifically designed to help generate income for residents, including mothers. As a pilot project, PWDC introduced this programme to residents of the Dewan Wawasan People's Housing Project (PPR) in February 2018, at the request of local residents. A series of workshops on paper and plastic handicraft were carried out for interested residents. Now, the handicraft products have started to receive orders, and some residents have started to generate income. Not a lot, but I think little by little, in time it will become a mountain. For the information of this august House, PWDC will hold a Penang State Women's Economic Empowerment Conference on 24 to 25 September 2018, which is next month. With the theme "Memikirkan Semula Keusahawanan Untuk Wanita Hari Ini". This conference is a platform for new entrepreneurs who wish to venture into business, entrepreneurs who wish to expand their current businesses, and also those who wish to supply products and services, where they can learn from successful entrepreneurs about how to do business effectively and efficiently. So, we would like to invite all Honourable Members, if you have women in your constituencies who wish to join this conference, you may contact PWDC.

According to statistics compiled for the public sector in Penang, which covers 84 Federal departments, 20 State departments and two Local Authorities, the percentage of women and men at the Top Management and Professional and Management levels is 56.5% men and 43.5% women respectively. Based on the percentages stated, gender equ… equality… equality has been achieved. Equality. However, 53.3% of the 6,103 civil servants in these two groups come from the Penang State Health Department, consisting of specialists, doctors and nurses. If the number of civil servants in the Penang State Health Department is not taken into account, the percentage of women in Top Management civil servants is only 27.8%, less than 30%, and men are 72.2%. This means there is still a gender gap at the top management level of the public sector in Penang. Honourable Members all, the Penang State Government has introduced and implemented a policy to increase women's representation in the structure of the Village Community Management Council, formerly known as JKKK. So we have set that by 2021 every JKKK must have at least five (5) women, but if it reaches 50, it is better. But I would like to introduce a new principle of gender balance, namely 40:40:20. 40 women, 40 men, and 20 is not for transgender, lah. The 20 goes to whoever is quicker, whoever is smarter, whoever is more efficient, that person gets it. So there will be no monopoly exceeding 60% for one gender. I hope Honourable Members can support this gender balance principle. Mr Speaker, can I?

Deputy Speaker of the House

Boleh.

Chong EngDAP · PHPadang LalangEN

The purpose of the Penang State Government in introducing this policy is to achieve gender equality by increasing the representation of women in the structure of the State Government. The representation of women in the MMK must be enhanced so that the voices and views of women leaders are heard and considered. This will ensure that programmes implemented at the grassroots also take into account the needs of women, children, the elderly and OKU. Penang is the only state that has adopted a policy like this. We want "Penang Leads", lah. In fact, one of the KPIs for EXCO is that every programme carried out by EXCO must be inclusive. That is, it must cover women, men, children, boys and girls, the elderly and OKU. This is one KPI. I hope the Honourable Members can also try to use this KPI in the programmes implemented in their respective constituencies. The Honourable Member should think first. For example, if we hold a programme such as a singing competition, we must count how many women and how many men there are. Are there elderly people or young people? So, if possible, it should cover everyone, because in the future we will establish a gender inclusiveness unit to monitor whether the programmes carried out are gender-inclusive and also inclusive, that is, not only men and women but also the elderly and young people, OKU and others. To build the capacity of women leaders in the MMK, PWDC has been tasked with organising a series of capacity-building and leadership workshops for women to serve in the MMK. By 2019, there will be 183 positions in the MMK that must be filled by women in all five districts. Therefore, all Honourable Members are urged to be ready to submit the names of candidates to be trained by PWDC. I also thank Sungai Pinang once again for raising the issue of the One Stop Centre for the registration of Child Care Centres. For the information of this august House, the establishment of Taska and child care centres, whether operated by the Government, non-governmental organisations or the private sector, plays an important role in providing childcare services and helping to address social problems. The Department of Social Welfare (JKM) is responsible for carrying out registration, inspection and enforcement, while the Local Authorities (PBT), the Fire and Rescue Department and the Health Department are the technical departments involved in granting approval before a Taska or Child Care Centre can be registered. The State Government will consider the Honourable Member's proposal to facilitate the registration process for child care centres and also Taska by operators. For the information of the Honourable Members, as was raised by the Honourable Batu Uban, the State Government is also carrying out a whitening process as an effort to register all Taska and child care centres in Penang. The State Government has decided to give a 90% discount on infrastructure development charges for applications to change the use of residential buildings to Taska and child care centres for those who are unlicensed and who were operating before 15 September 2017. The period of this discount will be from 15 September 2017 until 14 September 2018. So, about one month left. Integrated enforcement action together with all the agencies involved will be taken against Taska and child care centres that still operate without a licence after the discount period ends. However, so far the number of Taska and child care centre operators who have come forward to register is disappointing. Accordingly, among the other proposals that will be implemented to address the whitening problem are: (a) Recommending to the Ministry of Women, Family and Community Development that JKM be given permission to issue a temporary licence for a period of one year for centres that have not yet obtained approval from the technical agencies. The purpose of issuing temporary licences is to help operators meet the requirements of the technical agencies. The issuance of a one-year temporary licence is practised by the Penang State Education Department for tadika. So, we want to use the same procedure because we feel it would be good for them to be given a temporary licence for a period of one year, and we can monitor after one year whether they have a licence or not. (b) Recommending the Ministry of Housing and Local Government to harmonise the conditions and registration fees among all PBT in Malaysia, because we have also heard that in other states, the conditions for change are not so strict and the fees are much cheaper than in Penang. So we want to know whether this is true. Mr Speaker, at present there are 5,377 Taska and 20,057 tadika operating in Malaysia under the Ministry of Women, Family and Community Development, the Ministry of Rural Development, namely KEMAS, the Ministry of Education Malaysia, tadika, and the Prime Minister's Department, namely Taska Perpaduan, Taska Komuniti and also Taska PERMATA, formerly, but now Taska PERMATA has moved under the Ministry of Education. The State Government will propose to the Prime Minister of Malaysia that an agency be established to consolidate the management of all these Taska, tadika and child care centres under a single agency for early childhood care and education in Malaysia. This will also optimise operating costs and ensure that all children receive the same basic care and development. We can determine what values we want to teach these children. Right now, they are under different Taska under KEMAS, using a different curriculum and perhaps non-uniform standards. PJKK, Taska and Tadika are also very important in helping to retain women in the workforce. This is a type of gender stereotype in which the responsibility of caring for children and the elderly is placed on the shoulders of women. This mindset needs to be changed, and men and fathers must be educated to step forward and share that responsibility. Furthermore, Malaysia still has a low female labour force participation rate, namely 54.7%, compared with 80.1% for men. We have much potential among women that has not yet been fully tapped. But I also understand that nowadays many fathers also help, although not so much, but they do help. But what mothers do not like to hear is when a husband who is looking after the child says to his wife, "I am looking after your child, okay?" The wife gets angry: "This is not your child?" They must say, "I am looking after our child", do not say "I am looking after your child". The family is the most important social unit in a society. The happiness and well-being of the family are very important for creating a peaceful and progressive society. However, in this new millennium, many families face challenges and pressures in meeting not only daily needs but also emotional demands and affection that are often neglected. In this context, efforts to instil a sense of responsibility among all family members towards family harmony are extremely critical. Relationships between husband and wife, children and other family members must be friendly and good so that children develop a healthy character and intellect. An unstable family will give birth to a generation of children who will cause social problems for society. Therefore, when social ills occur in our society, the main cause is from a family unit that does not function or, with respect, a dysfunctional family unit. Parents should be able to protect their children and look after them, but there are many families where parents do not carry out their responsibilities well. Therefore, a problematic family unit invites various social problems such as online gambling, gangsterism, drug abuse, sexual harassment, bullying and others. This is because children were not disciplined well when they were young. Unhealthy behaviour must be curbed and nipped in the bud before it takes root.

As an effort to address social issues, preventive measures must be taken, starting from the family unit, which is the main source of social problems. So, when the Honourable Members ask, "what can a government do" to address the problems of drug abuse, gangsterism or online gambling, it is already too late. Once it has happened, it is very difficult to take intervention or rectify action. A better way is to prevent it when they are still small. Recently, the State Government has carried out a campaign, as I said earlier, to prevent sexual harassment or sexual assault against children. For parents, parenting skills programmes will be organised so that parents better understand how to manage their children better in this cyber era. The skill of nurturing a balanced family will be the main objective. Balance in terms of sharing household chores such as looking after children or the elderly, cleaning the house, cooking and so on. The programme will address the need for parents to be sensitive to their children's activities so that they can detect early if they find their children involved in negative social ills. Do not let it reach this stage. Look after them well when they are small; once they can go out of the house on their own, it will be too late. When they can go out of the house by bicycle or by bus, it will be a little late if we have not nurtured them well. Not instilling discipline or self-discipline, parents do not need to always chase them; they themselves know what is right to do and what is wrong to do. So I hope that we in the State Government will provide a Parents Classroom. It is not really a physical classroom but will organise courses for parents on how we can look after our children well before they show these negative effects. But in my experience, usually children are actually good; it is only because they do not feel their mother's love, they are not given enough affection. So they easily seek affection outside and they are taken advantage of. These girls aged 19, 11, 14, these children are taken advantage of by those who are less responsible. Deputy Speaker, the MMK Gender Inclusiveness Committee is a new committee established under the State Government with the aim of mainstreaming gender in policies and plans, and gender-related programmes to be implemented in the State of Penang in order to achieve gender equality. This is the only MMK Committee in the whole of Malaysia, only in Penang. This shows that the Penang State Government is very sensitive and understands the importance of holding this gender inclusiveness so that we can give women the opportunity to become leaders too, or so that their views are taken into account. I would like to take this opportunity in this august House to explain that gender equality involves both women and men, not only women. Gender is for women and men. It has become customary for gender equality policies to be classified as women's issues. This is because there are still gender gaps, especially in terms of economic and social decision-makers. Therefore, we must take steps to close the gender gap. The State Government is currently in the process of planning to provide an inclusive environment so that women, men and children have equal access to opportunities and access to fully realise their potential. Therefore, the goal of achieving gender equality must be shouldered not only by women but also by men. In the coming era, even now, there are already more women than men in universities. So we must also pay attention to why 20 years ago there were more men. When I was young, all my teachers were men, but now 80% of teachers are women. Why? Where did all the men go? In Parliament, now YB. Mat Sabu said men go to Serenti, women go to university. This is not good either, but this is according to statistics, not stereotypes but facts. Indeed, there are far more men in Serenti, and far more men in prison too. Why? This is something we need to study. Perhaps it is also because men are responsible for earning a living. When they cannot find a livelihood, they become desperate, and perhaps they steal, or rob, I think, this is one factor. Women are not responsible, although there are also many women who work and become the breadwinner for the family. But their number is much smaller. This is possible, this may be a possibility, so a study must be done. Lest one day, the situation is reversed. Later, more women will be working outside compared with men, and men will say they do not have equal opportunities. So it is better that we adopt a gender balance principle from now on. So that it will be balanced to protect fathers and men too. Not just for women. So, to spark discussion and sharing on gender inclusiveness in issues covering leadership, public facilities and so on, a workshop, (with permission)… a multi-stakeholder brainstorming session was held on 25 and 26 June 2018. The workshop was attended by 32 stakeholder participants from Government departments, non-governmental organisations, State Legislative Assembly members and also representatives from the private sector. And also experts in this gender field. One of the outcomes of the discussion was the confirmation by participants that Gender Responsive and Participatory Budgeting, or GRPB, is an effective mechanism for involving all levels of society in budget allocation and programmes. And all levels, and also men and women. The outcomes of the workshop will be used to form the mission and framework of Gender Inclusiveness. Following that, a gender policy and action plan will be formulated under the MMK Gender Inclusiveness Committee for use by all relevant parties. I think it will also include the service centres of the Honourable Members too. As an initial step in providing gender-related information, data on manpower statistics for State Government departments/agencies, Federal Departments, State Statutory Bodies, Federal Statutory Bodies and State Government Companies based on job groups and gender have been obtained. I have said this earlier, ah. This data is very much needed because the civil service is the leader and implementer in the public sector for planning, implementing, regulating and evaluating the programmes implemented. From time to time, the Gender Inclusiveness Committee will discuss gender issues in development and discuss ways of providing gender-related information for education and awareness. I would like to clarify that the principle of non-discrimination is enshrined in the Federal Constitution, where all citizens are equal before the law. According to our constitution, (with permission)… "there shall be no discrimination against citizens on the ground only of religion, race, descent, place of birth or gender." The word gender was added in 2001. Since the Parliament first had women opposition Members of Parliament. That is in 1999, the Parliament first had women opposition members, in 1999. So this shows that the number of women in Parliament will bring change in terms of law because we have a voice, but until now the voice is still not enough. Here in this House too. Still not enough. Not yet 30%. If there were at least 30%, we have 40, right? At least there must be 13. 12, 13, 14, haaa. So, how many are there now? Six (6) only. Not enough, aaa. So, your wives and your daughters, all of them, do not get enough voice and representation. The State Government has allocated, this is for religions other than Islam, yes. Just now, the Honourable Datok Keramat gave an answer, he has already given the answer. So I do not need to repeat it. Because I am in charge of the MMK, but YB. Datok Keramat is in charge of RIBI. How to allocate money under his purview. So, Honourable Members, if you want to apply for allocation funds for RIBI, please send them to the correct office, okay? What I would like to inform the Honourable Members in this House is about the Asia Pacific Masters Games, Penang. I think by now everyone knows that we will hold the Asia Pacific Masters Games or APMG next month, it is from 7 to 15 September 2018… (interruption).

Satees A/L MuniandyDAP · PHBagan DalamEN

Padang Lalang requests the floor. There are two matters that I raised in my debate speech. The first is about the State Government's position on RIBI sites, which are often provided by developers, usually located near sewage treatment plants, beside rubbish depots or electricity substations. Unsuitable land. And the other is whether there exists a Chinese Temple Allowance Port. I request that this also be answered. Because Datok Keramat did not answer. Thank you.

Chong EngDAP · PHPadang LalangEN

Thank you. That is about RIBI (non-Muslim places of worship) sites during planning. I think this falls under Datok Keramat. Datok Keramat handles local government. They can determine where these RIBI sites are. But if there are other RIBI sites that we allocate, they can be brought to me as well. For example now, in Ampang Jajar, is Ampang Jajar in the constituency of the Honourable Member for Bagan Jermal? Ha, okay. We have a piece of land there. We will distribute it, but we are still in planning. We have, indeed we have discussed this issue before, but this is very complicated because there are many, many of these RIBI Chinese temples, because we have Buddhism, Taoism, and many others. We have Night Emperor Gods, we have Guan Yin, and we have some Taichung, Tua Pek Kong, Kwan Kung, many, many.

Satees A/L MuniandyDAP · PHBagan DalamEN

Honourable Member for Padang Lalang, I think Buddhism has an umbrella body, right? In Malaysia. Apart from Buddhism, all religions can, I mean Chinese religion can be included in that. A view.

Chong EngDAP · PHPadang LalangEN

But there are temples that are not the same. It is a bit complicated, complicated. Complicated, ah? So, we will study it further. If the Honourable Members agree, we will hold it, okay? So for this APMG, a total of 22 events will be contested with targets, and up to today we have 4,657 participants. Yes. These participants come from 61 countries, and at present there is, I think this is the only sports event with the largest number of foreign participants. So, I hope the Honourable Members will take the opportunity to participate. And also give the opportunity to athletes in your constituencies to participate too. I want to inform you, this is the Honourable Member for Berapit, he will take part in the cross-channel swim together with the Mayor. If you want, you can too. Honourable Members can too. Yes, and I would like to thank the Honourable Members who have agreed to help, yes, for several events. For example, the Honourable Member for Batu Uban handles silat, the Honourable Member for Bagan Jermal, basketball. The Honourable Member for KOMTAR handles wushu and lion dance, the Honourable Member for Batu Lacang, not here, golf, I think he handles it. I think the Honourable Mr Speaker can handle football, maybe? But football has already reached the target, 200 people. It has exceeded it. And I think the Honourable Members, among them, who have already registered several packages, each one, I must praise, the Honourable Member for Tanjong Tokong, Tanjung Bunga, Tanjung Bunga, who is the fastest. He is the fastest to submit the list. And I think Berapit too, Berapit has already got names. Who else? That Jawi already has them, Gooi has not paid yet. It will be given, an invoice will be issued, an invoice will be issued; after receiving the invoice, please pay. Pay? I think Sungai Pinang has too. And others, I hope, this… Pulau Tikus has too.

Deputy Speaker of the HouseEN

Honourable Member for Padang Lalang.

Chong EngDAP · PHPadang LalangEN

Will finish. Will finish. One more. Ayer Itam has also helped a lot. Member for Air Itam (YB. Joseph Ng Soon Siang): Since last year. I would like to interject about APMG. Since the closing date was yesterday, right? And our number of participants, is there, I want the financial status for APMG. With permission, is it, I mean the people who have registered, and the money we have collected, can we cover our costs? Thank you.

Chong EngDAP · PHPadang LalangEN

I must say frankly that the allocation given by the government and this registration fee are still not enough to cover all costs. Why? Because we have added two (2) sports, namely silat, lion dance and wushu, and these were not budgeted. And now we have become the government at the federal level, RTM (Radio Televisyen Malaysia) wants to broadcast our opening live. We must make it, more… more… more… a bit grander, yes. A bit grander if there is an event organiser. The SEA Games opening cost how many millions? I don't remember how many millions. But we are using less than 1 million. We are using our own manpower, no event organiser… (interruption).

Joseph Ng Soon SiangDAP · PHAir ItamEN

YB. Padang Lalang. I plan, I mean I suggest, considering that the Federal Government and the State Government are in one same government, and the Asia Pacific Masters Games is being held in Malaysia for the first time. Perhaps before this, publicity may not have been enough. Considering we have one more month left. Perhaps there are big companies that may be interested to become our sponsors. Perhaps the State Government's efforts to seek more from them, taking this opportunity, considering the excellent publicity from RTM which has recently shown interest.

Chong EngDAP · PHPadang LalangEN

Thank you. This suggestion is good. Very good, because now RTM has already, already wants to telecast. Perhaps there are big companies that will be interested. So, Honourable Members, if Air Putih. Air Itam has, there are companies, companies that are interested, you can also inform them.

Joseph Ng Soon SiangDAP · PHAir ItamEN

I suggest Ayer Tawar, because earlier he said he wants to find sponsors, you can look to him.

Chong EngDAP · PHPadang LalangEN

But here I also forgot earlier. The secretariat of APMG 2018 together with the Penang Island City Council (MBPP), in collaboration with the Malaysian Association of Local Authorities (MALA), is organising the Penang APMG 2018 Torch Relay. This 3,608-kilometre journey started in Kudat, Sabah on 28 April 2018. What date is this? This is the day of our naming. And it has passed through Labuan, Sarawak, Kedah, Perlis, Kelantan, Johor, Melaka, Terengganu, Pahang, and today, tomorrow it will reach Negeri Sembilan. The next leg goes to Putrajaya, Kuala Lumpur, Selangor, Perak and Penang in September, and will end at the Penang City Stadium on 8 September this year, in conjunction with the official opening ceremony. The purpose of the APMG Torch Relay is to create awareness and more comprehensive publicity among Malaysians regarding the Penang APMG 2018 Championship, and the International Masters Games Association is very impressed with this torch relay and is also very satisfied with us in the preparation of this APMG. So I want to say many thanks to MBPP, especially the Mayor, because this torch relay was the Mayor's idea. The last issue is about asking the Leader of the Opposition… (interruption).

Heng Lee LeeDAP · PHBerapitEN

Allow me to interject. To YB. Padang Lalang, because earlier YB. touched on sports events, although now it is not in the MMK for sports but because YB. is the Chairman of the MMK for Family and Community. I would like to ask here, does YB. Padang Lalang agree on the importance of exercise, sports and recreation for everyone, including the Honourable Members in this House, and is there, is there a plan for a KPI so that all State Assembly Members can (with permission)… maintain fitness for everyone, because I think all the Honourable Members here are also tired or (with permission)… overloaded with daily routine work. Perhaps a suitable plan is needed so that we can release tension. Thank you.

Chong EngDAP · PHPadang LalangEN

I will discuss with Mr Speaker, yes, how we can, I prevent them when meeting until 10.00 pm… (interruption).

Heng Lee LeeDAP · PHBerapitEN

Sorry. What I mean is not during House sittings but throughout the year.

Chong EngDAP · PHPadang LalangEN

Throughout the year, ar. Of course, always do sports, exercise. Get up early in the morning and go for a walk of 5,000 steps or 10,000 steps. That will keep you fit and energetic throughout the day. So if you want to do sports, any sport is fine. If not, even if facilities are provided, they are not used. Many people, I know, have bicycles or running machines at home but do not use them. Right ar? But this river is for Sungai Ara. Sungai Ara… Sungai Dua has come up with the UEC. Yes, right? Unites Examination Certificate. It is a secondary school examination administered by the Malaysian Chinese School Board of Management, or in Chinese it is called Dong Zong. The first examination was held in 1975. This examination is equivalent to the A Level examination, in which students from private Chinese secondary schools sit for the examination. There are three (3) levels in the UEC, namely UEC Vocational, UEC Junior and Senior. The Senior is the secondary school, it has 6 years. The first three years are junior and the last three years are senior. It is like up to STPM, yes. The Chinese language is the medium of instruction for co-curricular activities and examinations for UEC Vocational and UEC Junior. Chinese or English is the medium of instruction for the subjects of Mathematics and Science, namely Biology, chemistry and physics. Accounts and Commerce. So it is bilingual. Either they learn English and also Chinese. The UEC certificate is recognised by many leading international universities, including Oxford University, University of Cambridge, Australian National University, Kyoto University, California Institute of Technology and Peking University. So, it is not only for going to Taiwan, and we have in DAP, there is a YB in Sarawak, YB. Violet Yon. She took the UEC but she also took the SPM. So she could go to Australia and get a law degree and become a lawyer. I think the Honourable Member for Sungai Dua, he does not agree to recognise this UEC so that they can use this certificate to enter local universities. Now Malaysian private universities all recognise this UEC. You can use the UEC to enter universities, what other universities… Multimedia University. Only government universities do not recognise it. I think earlier I discussed with Perai and Perai was of the view that why can we not take from multiple channels. For example, our universities, local universities take through STPM and also matriculation. Two systems what. Two systems that have diplomas too. And we also take students from Africa and other countries. They do not have STPM or SPM. They use their certificates but are equivalent to STPM or SPM. So, I hope Sungai Dua may perhaps not understand because there is no approach to this UEC. I hope after understanding, he can support it. Recognising, because recognising this UEC does not harm anyone but will benefit our country because when we recognise it, they can work for the government. Now they cannot work with the government.

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

Padang Lalang. I have looked back at all the UEC because we are the nation of Malaysia. We emphasise Malay language, the national language, and also English as the second language. This UEC, I heard earlier, Bahasa Mandarin. Chinese, Mandarin and English. So, we in Malaysia also have national-type Chinese secondary schools and so on whose students take the SPM, STP and so on. So, we want to ensure that all races, all Chinese, Indians, Malays, make Bahasa Melayu a requirement for the SPM, STP and so on, although at university too there is Bahasa Melayu, I think. We want Bahasa Melayu to be uplifted and we can create a Malaysian national culture by using that method. If we use the UEC method. It is not that I want to oppose, I do not object, but the Bahasa Melayu requirement must also be there. The SPM must also be there. The SPM must also be taken. UEC and also SPM. They cannot take only the UEC. They must have the SPM. They must also take the SPM to ensure they have two. They have two. Two… (interruption).

Chong EngDAP · PHPadang LalangEN

There are indeed students who take two (2), the UEC and SPM, but not all students can take two examinations at the same time. So, some choose to take the UEC, but in these private schools there are also those who are allowed to take the SPM and not the UEC. It is like a private school. So, I think what is important is that we can all converse in Bahasa Malaysia. For example, in Mauritius, the spoken language for everyone is Creole, but in their schools they learn English, French and also their own mother tongues.

Honourable Member for Sungai Dua, although I myself also agree that Bahasa Malaysia is very important and everyone must learn it, but I know whether Sungai Dua has observed the top-most leaders in Malaysia. All of them, their English is very good. He is good in Chinese too, but his English is not good, he cannot go to the world. Same. If Bahasa Malaysia is very good too, it can reach Parliament, or can even go to Indonesia, but if they want to go international, they all use English. We see that it is not only UMNO, the top leader of UMNO also all have very good English. Najib, he studied abroad, who else. Hishammuddin, he studied abroad. Their children all studied abroad. And now some have started studying in China too. Here, I am not saying, I mean we are not the Chief Minister's, did the Chief Minister first study English or Bahasa Malaysia? But Chinese is also very good now… (interruption).

Muhamad Yusoff Bin Mohd NoorUMNO · BNSungai DuaEN

There is nothing wrong if Bahasa Malaysia is given priority in schools, in learning, and English is given priority too. We once did English, Science in English. We also want English for, for international purposes, for international relations, for studying abroad and so on. But in the context of Bahasa Melayu, we must still protect it as the language… (interruption).

Chong EngDAP · PHPadang LalangEN

Of course we protect it… we protect it… (interruption).

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

I ask Sungai Dua, this is an old friend. What is the obstacle if we take into account the developments of public or private universities around the world. Now, entry into universities has five (5), six (6), seven (7) channels. Only in Malaysia we only have three (3) channels: STPM, Matriculation and Diploma. I, I am not taking sides with UEC or anyone. My proposal is that the time has come for either private universities in Malaysia or public universities to open up so that there are channels that can be added, whether this is UEC, whether this is Arabic classes, whether this is the Tamil language. As long as they have an SPM pass in Bahasa Malaysia. Do not forget the medium of instruction at universities is Bahasa Melayu, right. I take one (1) example, recently a Malaysian student went to Bangladesh. The medium of instruction at the public university in Bangladesh is Bengali, not the Bengali we understand here. This student did not have it, but he entered this university for medicine. He followed his course while learning the Bengali language. This is one that I think is different. We hold as if, in fact, when we give recognition to the UEC or anything. I do not mind about the UEC, I only discuss in principle. When someone enters, they must have an SPM with credit. They enter a local university where the medium of instruction is Bahasa Melayu. They have to,

follow, not that they want to follow whatever Mandarin or anything. This is one of, what, in the Pakatan Harapan manifesto, but we leave it to the Ministry of Education to decide. Surely the ministry does not want to take five (5) years. When it takes five (5) years, it has already engaged in politics. I say now we want to diversify the university admission channels. Now public universities do not take A-Level, why? Only STPM, Matriculation, English Matriculation do not forget, Diploma. Why can we not enter with the International Baccalaureate? Why not qualifications of equivalent standing? This is what I think public universities are behind the times, I think. I do not mind if we have secondary schools in Arabic, let us take students who are Arabs, but they must follow Bahasa Melayu in public universities. They cannot escape from Bahasa Melayu. So what is there to fear, how will this undermine the struggle for Bahasa Melayu you say? Is this so? When we do this, we bring students from Nigeria to local universities. They enter with qualifications equivalent to A-Level, perhaps most of them enter private universities. Private ones indeed have perhaps 10 channels. Why are public universities, funded by the people's money, behind the times? I am not discussing UEC only. I am discussing any Arabic or Spanish. We let them in, as long as they must follow the medium of instruction Bahasa Melayu. Here we place one more condition, they must obtain credit in Bahasa Melayu. How will this bring down the image and dignity of Bahasa Melayu, let us say, Sungai Dua, thank you.

Chong EngDAP · PHPadang LalangEN

Sungai Dua agrees with the Honourable Member for Perai, yes. Indeed, our students go to Japan to study where the medium of instruction is Japanese. But we study for six (6) months so that we can master their language in order to study. So it is the same here: at government universities too, the medium of instruction is Bahasa Malaysia. So anyone who wants to enter, their Bahasa Malaysia must be at that level. So I hope that together we can accept that UEC is indeed equivalent to A-Level. So I hope the Honourable Member for Sungai Dua can support it. Finally, I would like to express my thousand thanks to all parties, including departments, government agencies, NGOs, and the communities and private institutions that have helped the State Government to implement programmes for women and family development, gender and non-Islamic religious inclusiveness, for the welfare and prosperity of the people of the State of Penang. May the cooperation between the government and society always, and continuously, help the State Government in improving its services to the biggest shareholder, namely the people of the State of Penang. That is all, thank you.

Deputy Speaker of the HouseEN

Thank you, the Honourable Member for Padang Lalang. I invite the Honourable Member for the Perai constituency to speak.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

There are only 20 minutes left. It's alright, I may perhaps… (disturbance).

Deputy Speaker of the HouseEN

35 minutes… 25 minutes, it's alright. Deputy Chief Minister II. But I also, I am not sure whether I will finish. However, earlier I gave this explanation, which is a small part of my winding-up speech earlier. But I am keeping this for last, however, earlier I discussed UEC briefly. Honourable Deputy Speaker, thank you, what is this, for giving me the opportunity to answer the questions raised that are relevant to my portfolio, and I will try, I will not read, but I will just answer some questions. First, the Honourable Member for Pantai Jerejak has requested the State Government to build a library in Pantai Jerejak with complete infrastructure and equipment. I do agree, although recently PDC has taken over the place where the library was to be located, but now we will look for one (1) suitable site so that we will build it and equip it adequately for a library under the Penang Library Corporation. We will try this. The second question. The Honourable Member for Penanti has called on the State Government to consider subsidising part of the operating costs of Penang Science Cafe in Taman Guar Perahu. Now, I should, what is this, discuss this matter either in EXCO or in Penang STEM and so on, whether we can take on this cost or not. So this is what will be taken into consideration.

The third question concerns Penang STEM Sendirian Berhad, and the Honourable Member for Penanti asked about the criteria used for selecting members of Penang STEM Sendirian Berhad and the STEM centres under it. STEM is an umbrella body that was established last year. Under STEM, what is this, we have placed the Penang Digital Library, we have the Science Cluster, we have Tech Dome, we have, what is this, the Mathematics Centre and so on. So this is a combination and the basis or principle of how this centre functions is driven by and based on input from the non-government industry. As chairman, I was newly appointed Chairman of STEM. My function is, if necessary, to provide seed money funding so that these can be carried out. As chairman, perhaps one or two people are from the State Government, some from PDC or CMI, and most of those who hold positions are from industry. This is because we hold to the principle that those in industry know more than us. I am only the Coordinator. The same goes for the units placed under STEM. Because this is a public-private partnership, where the government acts only as coordinator. We will not interfere in issues that require the expertise of science and technology industry experts. Therefore, in these two (2) years I think we have achieved several successes, where Penang is the only state that has, what is this, STEM and the units were established before STEM was established. We have the Penang Digital Library, we have Tech Dome which holds exhibitions on space technology and so on, we teach school children about, what is this, coding and so on. Those who have never seen Tech Dome, please go to the one at KOMTAR. So, the question from Penanti on organisational structure is that I am the chairman, there is one or two from the State Government, EXCO or ADUN, and most are from industry. This is because we are former Chief Minister, and I also agree with what he said, that we hand over to industry to carry out all these activities. Only we give them space and then we assist from time to time. And most of the funds they receive are from industry. If I imagine if the government wanted to do all of this. I think I am sure we would fail. That is what I think is the experience in other states. So that is my answer to Penanti. The Honourable Member for Pulau Tikus proposed that the State Government focus on the talents of young people to prevent the young people of the State of Penang from migrating to other states (brain drain). Brain drain is a global phenomenon. There is also brain drain from the United States, there is also brain drain from Singapore to other countries, there is also brain drain from Penang, and there is also brain drain from other states. This is something we cannot avoid in the era of globalisation. However, I think we must, what is this, pay attention to how we will stop this brain drain in Penang, and I think one way is that we provide scholarships, for example through Penang Future Foundation, so that they will return to work in Penang. We also give a "one-off" RM1,000 to students who go to public universities, and we also provide training through PSDC and so on so that they will continue to stay in Penang. But there is no guarantee that they will remain in Penang when they get prospects in other countries, or in Kuala Lumpur or Singapore, they will migrate. That is a human phenomenon passed down through generations. Perhaps this can be accelerated in this modern era. You cannot stop that. I too was astonished why some residents in Singapore want to migrate to New Zealand and Australia. Although I think their situation is good in Singapore, salaries are also high. They also think about their quality of life. The issue of unemployment raised by Penaga. So the Honourable Member for Penaga said there is unemployment, there is not none. Only a little. These are people who are drifting, because Penang has statistics of 2.1 who are unemployed in Penang, very low, very low, percent. Perhaps governments in other states have 3% and so on. So if these are the statistics. We cannot say that the unemployment problem is critical in Penang. However, I think this issue of unemployment, I think it is those who are looking for work or, what is this, looking for better prospects than what they have. So, I think this is not one (1) issue. However, I think we must take several steps to control, what is this, this situation, so that, one (1), we welcome investment in Penang. We also, what is this, give initiatives to science and technology and so on, because I think, as we see, this work is for the Fourth Industrial Revolution industry, because the future will depend on how we master the Fourth Industrial Revolution and so on. And there are these programmes being carried out, regarding, what is this, question, to answer the Honourable Member for Seri Delima on the State Government's consideration of statistics on student participation in STEM programmes. There are indeed statistics, and I think, roughly speaking, we can see that participation by students has indeed increased. If we get statistics from DOME, it does have statistics, statistics at Penang Science Cluster, PDIL. We also have expanded, perhaps make one more (1) place a Penang Digital Library. This indeed has increased. I think this is one (1) thing that does not surprise us, there is a great demand for science and technology coding and so on. So, I have a little, what is this, data here, for example, up to now, 250 programmes have been organised with participation of more than 400,000 participants estimated. So these programmes have an impact, although not a big impact, but this impact is indeed increasing day by day. So we also have, what is this, Penang Digital Library or Islamic Digital Library that have been or are being established, and there is also a second phase of the Digital Library. So indeed, to the Honourable Members, I think if there is an opportunity, please take the time to visit these places such as Penang Science Cluster, Penang Digital Library, the Mathematics Centre or Karpal Singh Learning Centre and so on. And to witness for yourselves what the State Government has implemented in these two (2) years. The Honourable Member for Pulau Tikus called on the State Government to provide an appropriate plan for Persons with Disabilities (OKU), not what is this, Persons with Disabilities, Disabilities… (disturbance).

Lee Chun KitDAP · PHPulau Tikus

The proper, the proper way we recognize is Kurang Upaya.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

However, I think I prefer the term Disabilities, because we too may be Disabled. So this, what is this, is to enhance their, what is this, status in society. So I think one of the problems is that we do not have a policy, what is this, law at national level that gives scope to those who are OKU. So indeed I myself have, what is this, extended this in EXCO so that we ask all State Government Bodies to give a sufficiently good service to OKU. I think one of them is the library, where they have taken on, as, what is this, work for OKU and so on. So we must ensure that all State Government Bodies do not have any discrimination but give opportunities to these OKU, because Stephen Hawking, who won the Nobel Prize, was also OKU. And also there are several, I do not have an example here, that show their talents, that show, what is this, their excellence even though they are regarded as OKU. The Honourable Member for Air Itam has called for the State Government to extend to the Federal Government the matter of school needs at the level of the Ministry of Education Malaysia. I think I have discussed this in this House, that recently, on, what is this, advice and instructions from the Chief Minister, we propose that we must help financially, we establish a fund so that we help national schools. In these 10 years we have indeed helped financially Chinese national-type primary and secondary schools, Tamil national-type primary schools, People's Religious Schools, and also mission schools, because they are considered as capital assistance. This is because we only pay teachers' salaries but do not give funds for infrastructure and so on. So indeed it has now come to, after the 14th General Election, the point where we want to look at national schools that are indeed short of funds. Recently I received visits from these schools asking for funds. But we do not have a budget for this year. So next year we will set up a committee, I have indeed already discussed this matter with the Director of Education, Encik Jamil, and then we set up a committee, and then when EXCO establishes a fund, I think we will begin, what is this, giving these funds in January 2019 (House thumps desks). So it is not that we are running away from our responsibility, we will establish the fund, and I think the education department, what is this, they also welcome it. So we will not neglect national schools. So finally I want to touch on UEC, but I have already touched on it at the beginning. Yes.

Satees A/L MuniandyDAP · PHBagan DalamEN

The Honourable Member for Perai, I have one (1) question. This is one of the things that I will say haunts me, but people ask me in my constituency. Before the 2013 general election we visited and looked at a site to see if it was suitable to be made into a school, to build a Tamil school in Bagan Dalam. The demand is that about 25% of the Bagan Dalam population is from the Indian community, and the existing Mak Mandin school, in Bagan Jermal, originally came from Bagan Dalam, and Bagan Dalam has lost a Tamil school. I have Chinese schools, mission schools, national schools, all are there, but there is no Tamil school. Can the State Government provide a piece of land to build a Tamil school in the future. That is my question. Thank you.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

Thank you, the Member from Bagan Dalam. This issue is not a new issue. I think in 2008, when we were, what is this, able to govern Penang, this issue was raised by the Member for Bagan Dalam now, Dato' Tanasekharan. He will, what is this, raise this issue every time we have a sitting of this DUN. And this matter, I think we can take it and discuss it at EXCO level, but the thing is, if we give land, who will build the school? Because the State Government will not build a school, the infrastructure building. That is the Federal Government. We must get agreement from the Federal Government. However, I think we will discuss this matter later and see what the prospects are. So, so the Member for Bagan Dalam, this new Member for Bagan Dalam, this is not the first time, every time this issue is raised. The issue of the Tamil school in Bagan Dalam, and I also understand that the Mak Mandin school, I think the students at this Tamil school are indeed full, and they also, the former Chief Minister also gave him an assurance about a small piece of land near the Mak Mandin school, because this school indeed does not have enough space for, what is this, these students, so that is a problem. So the issue of the Tamil school in Bagan Dalam, I think we will raise this in EXCO and see how the prospects are. Now the only problem is that the Federal Government does not have funds.

Satees A/L MuniandyDAP · PHBagan DalamEN

Land first, then we obtain funds. Land then funds.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

But usually we will combine both of these. It's alright, I cannot give any assurance now. However, this matter will be, will be discussed later. So Deputy Speaker, this UEC issue I have already discussed earlier, no need for me to repeat it.

Deputy Speaker of the House

Terima kasih.

Prof. Dr. P. Ramasamy A/L PalanisamyDAP · PHDeputy Chief Minister II · PeraiEN

So that is all, these are my answers to the questions raised during this sitting of the House. I thank all the Members who have participated, who have worked hard on the issues of the House, and with that I thank you and, err… I think there are one or two matters before I say good night. Thank you.

Deputy Speaker of the HouseEN

Thank you, the Honourable Member for the Perai constituency. Honourable Members of the House, the sitting is adjourned. The House will reconvene on 10 August 2018 at 9.30 a.m.

The House was adjourned at 10.00 p.m.