Selangor · 4 December 2018

14th Assembly, 1st session, 3rd meeting · 363 turns · 42,024 words · official PDF ↗ · Digital Hansard ↗

281 of 363 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.

(Opening)

Secretary of the HouseEN

Good morning and greetings of peace. The Order of Business for the Third Meeting of the First Session of the Fourteenth Selangor State Legislative Assembly on 4 December 2018 begins with the recitation of prayers.

Assistant Secretary of the House

Bacaan Doa.

Oral QuestionsQuestions

Secretary of the HouseEN

The next item on the Order of Business is questions.

SpeakerEN

Greetings of peace and good morning to all Honourable Members. I invite the Honourable Member for Balakong.

Puan Wong Siew KiDAP · PHBalakongEN

Thank you, Mr Speaker, my question is No. 92.

TITLE: INFRASTRUCTURE ALLOCATION FOR MALAY AND TRADITIONAL VILLAGES

92. Asks Y.A.B. Dato' Menteri Besar:-

a) There are Malay and traditional villages without a planned irrigation system or drainage system plan. This causes flash floods and soil erosion to frequently occur in the villages. What plans will be prepared to overcome this problem?

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Thank you, Mr Speaker, and thank you, Balakong. The Selangor State Government is aware that most traditional villages or kampung do not have a planned drainage system or planned drains. Moreover, there is a lot of land that does not have or does not meet the stipulated requirements, for example agricultural land, but which is largely occupied or used for residential houses built on it. Likewise, regarding reserve lands, many have been encroached upon or occupied for a long time. Therefore, the issues or problems related to flash floods and soil erosion are among the main issues and problems that are often raised in the preparation of local plans. For this purpose, every local plan that is prepared must, in addition to identifying the areas involved, also address the overcoming of these problems. Proposals for projects to be implemented to overcome the stated problems also refer to these local plans. So, for the Honourable Member, the state authority is currently preparing a special action plan, namely a study on the restructuring of villages and in urban areas of the State of Selangor, from 2019 to 2023. Among the scope of this study is the preparation of an infrastructure and utility plan, traffic, and also public transport as well as community facilities. This means this plan will produce a fairly comprehensive action plan that covers many aspects, namely in addition to drainage and road infrastructure, it also relates to utilities, traffic, and public transport, including the provision or plans for providing WiFi and so on. As a start, this study will involve 27 of the 519 villages identified as being outside urban boundaries and experiencing high development pressure. We start with 519 kampung compensation, including new villages, but we will only involve 27 first. For the information of the House, this study, which involves a cost of 1.5 million, is currently at the stage of preparing the draft technical report, while the final TK report is expected to be completed on 2 February 2019. In the context of State Government planning, development in exposed areas that are vulnerable to flood risks or disasters that will affect the well-being of residents is not encouraged. I would like to tell the Honourable Member that, apart from our efforts to prepare this special action plan, under the use of the village "profile" system which I have already informed this august House about previously, it is a medium for identifying and collecting issues and problems in the villages. So, in conclusion, we are carrying out the data collection in two ways. First, we are collecting through the PTK that we have planned, specifically for the 27 villages on the outskirts of or within the urban areas first, but at the same time, starting this January, we will also ensure that all village heads begin entering inventories or proposals, problems around the villages, road problems, drains and so on, which must be entered into the village "profile" system. So, what action will be taken after these two things are done? After these two matters are completed, God willing, we hope that as early as March we will sit at the same table to ensure its implementation within the next five years. This includes coordination with the Implementation Coordination Unit, or in English, ICU, where we will work with the Federal Government and it will be handed over to the relevant agencies. To ensure that every intention and every action will be taken and subsequently monitored more closely. The agencies I mean may involve the Department of Irrigation and Drainage (JPS), we will involve the PLB, the Ministry of Rural Development, and the State Authorities and also the Local Authorities will be involved. Thank you, Mr Speaker, that is all.

Speaker

Balakong.

Puan Wong Siew KiDAP · PHBalakongEN

Thank you, Mr Speaker. Supplementary question: what is the classification for the 27 selected villages to be a "special task force", with permission, thank you.

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

For the start, Honourable Member, we are only selecting villages on the urban border, because the criteria are the surrounding areas or within the city and urban outskirts, and these are the ones that are most affected when there is development in the city. Apart from that, it does not mean we are ignoring those outside the city, because only the special action plan focuses on the 27 urban and 27 villages, but the village "profile" system takes into account all villages in Selangor. However, for this special action plan, because we know that when there is development, it is the outskirts of the villages, which are usually the urban outskirts, that will be affected because of the extraordinary downpour of water and so on, but there is no proper drainage system there, thank you.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Soalan tambahan.

Speaker

Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you to the Honourable EXCO for Batu Tiga, who has explained the issues and problems of flooding in the villages and the plans prepared to overcome this problem. My question on Malay and traditional villages is that indeed there is definitely no planned drainage system in these villages, and some of these villages have mostly private drains and channels. They are not owned by any authority agency or government. So, what is the State Government's plan to take over these drains, because most of the villages that were built do not have planning permission or plans, they have been in existence there for a long time. But the drainage is exclusively privately owned, which means that if we want to do something, we have to, I have a village in Kampung Nelayan Telok Gong, until today, even yesterday when it rained, it is still flooded up to now, and I hope that it is also included in the 27 because it is also on the urban outskirts.

SpeakerEN

Honourable Member, please be brief.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

My question is how to take over the privately owned drains.

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Thank you, Pelabuhan Klang. In fact, it is not easy to take over the drains, because there are very many privately owned properties, and we are sure it will involve high costs for the government. But what we can do, I am also thinking about whether we have a method for how we hand over or give or collect an inventory of village roads that are privately owned, which we often see are not paved or not properly built. This means the most important process is that we must first make an inventory. Once we have made an inventory, I think the steps we can propose, but I think they do not involve the State Government, but this will be submitted to the Ministry of Rural Development, namely we will focus on ensuring that villages with flood hotspots will be given priority on how to resolve this problem. If village roads, for example, we do it, they need to hand over first, which means these landowners must be informed that they are involved and they must take part in this matter. But what remains is the method, namely who will bear the cost, which is the most important factor. That is why the Ministry of Rural Development together with STANCO, I will also ensure this matter can be resolved in, not resolved, meaning we find a solution to ensure drains will also be taken into account, not just roads as has been the case so far, thank you.

SpeakerEN

Honourable Member for Pelabuhan Klang, the next question.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Mr Speaker, my question is Pelabuhan Klang No. 93.

TITLE: PLANTING OF MANGROVE TREES

93. Asks Y.A.B. Dato' Menteri Besar:-

a) What actions will the State Government take to curb the illegal logging of mangrove trees which causes soil erosion in this State?

b) What efforts have the State Government made to preserve and rehabilitate the planting of mangrove trees as an initiative for flood mitigation?

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Honourable Member for Pelabuhan Klang. I think the first question regarding curbing the logging activities, I hope, and I have already answered this question during the budget 2019 committee debate. To answer the second question, the State Government's efforts to preserve and rehabilitate mangrove forests for flood mitigation initiatives. To answer this question, the Selangor State Forestry Department has carried out comprehensive tree planting programmes with involvement from various levels such as the Department, government and private agencies, NGOs, IPTA, IPTS, companies, village residents, individuals and so on. The budget for tree planting programmes is financed through local allocations provided by the State Government, development projects and EXCO office allocations, UPEN through the local authority section. In addition, budget allocations are also obtained from Federal Government-level development projects through the headquarters of the Forestry Department Peninsular Malaysia, namely JPSM, or the Department of Groundwater and Natural Resources (KATS), formerly the Ministry of Natural Resources and Environment (NRE). For 2018 alone, a total of 6 awareness campaigns or mangrove tree planting programmes have been successfully implemented. This programme involved 8,000 participants with an area of approximately 8 hectares. This year too, His Royal Highness the Sultan of Selangor and Her Royal Highness the Raja Permaisuri of Selangor graciously consented to undertake tree planting activities with the people of the State of Selangor at Sepang Kecil Forest Reserve on 18 March 2018. In addition, the International Day of Forests 2018 and the National-level Day of Conservation of Mangrove Forest Ecosystems for 2018 were also held at Kuala Bernam Forest Reserve, Sabak Bernam District. The latest programme that has been implemented coincided with the meeting of the State Directors of Peninsular Malaysia, which was held in the Sungai Klang Mangrove Forest. The total number of trees planted in the entire recent programme is 23,500 mangrove trees. The types of mangrove trees in layers according to habitat suitability each play their respective functional roles, the high density of trees in an area can act as a breakwater and prevent coastal erosion and reduce the speed of water from the sea to the coastal fringes. Thank you.

Speaker

Dusun Tua.

Thank you, Mr Speaker, my question is No. 94.

TITLE: INCOME VERIFICATION

94. Asks Y.A.B. Dato' Menteri Besar:-

a) For KISS and Kad Peduli Sihat applications, has the State Government considered using the applicant's bank statement as a means of verifying income so that it is more transparent?

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Member for Dusun Tua. Dusun Tua asked whether to consider using bank statements for applicants of the KISS Card and Kad Peduli Sihat. For the time being, verification of applications for the Kasih Ibu programme and SMART Selangor or KISS is through the Kasih Ibu SMART Selangor KISS registration form and is verified by the respective Honourable Members of the State Assembly. However, the State Government will consider and welcome any proposal to use bank statements or other suitable proposals according to the needs and accountability of applicants to be transparent in providing personal information to every assistance programme provided by the State Government, thank you.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Soalan Tambahan.

Speaker

Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Speaker. Since the Welfare Department already has mechanisms, officers and processes for determining the income of poor families before extending assistance, can we combine the KISS process and the Welfare Department process so that it is more transparent and more uniform?

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Member for Bukit Gasing. In fact, if the applicant has indeed already received certain JKM assistance or certain zakat assistance, then the KISS application is easier for us to verify. But if we look at the KISS applications that we have, Honourable Member, there are many, and if we want to combine these two processes and ask JKM officers to carry out verification, this will add to the workload of JKM officers and of course it is subject to further discussion with JKM. Thank you.

Speaker

Rawang.

Tuan Chua Wei KiatPKR · PHRawangEN

Mr Speaker, supplementary question. For KISS applications next year, will it be reopened for everyone or will it remain with the existing arrangement.

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you. I think for next year, the current KISS recipients will be maintained. However, we will request that new applicants must go through E-Kasih first, and applicants who wish to continue receiving KISS must also apply for E-Kasih. So we will carry out matching between current KISS recipients and applicants with E-Kasih. If they have not applied for E-Kasih or have been removed from the E-Kasih list, then perhaps in about half a year they will be removed from the KISS list. Thank you.

SpeakerEN

The next item. Rawang.

Tuan Chua Wei KiatPKR · PHRawangEN

Thank you, Mr Speaker. My question is question No. 95.

Oral Questions — Rentis electricity supply line project, car project, Kampung Baru Sungai TerentangQuestions

Tuan Chua Wei KiatPKR · PHRawangEN

95. Asks Y.A.B. Dato' Menteri Besar:-

a) State the status of the land acquisition withdrawal for the Electricity Supply Line Rental Project at Kampung Baru Sungai Terentang, Rawang. b) When will the CAR Electricity Supply Line Rental Project towers be demolished? c) What is the status of the land concerned for the 33KV Electricity Supply Line Rental at Kampung Sungai Terentang?

Tuan Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

Yes, Mr Speaker. Thank you to the Honourable Member for Rawang regarding the question on the electricity supply line rental project. The CAR project at Kampung Baru Sungai Terentang. For the information of the Honourable Member, land acquisition for the original alignment in Kampung Baru Sungai Terentang was gazetted under Section 8 of the Land Acquisition Act in 2007, involving 35 titles on the site. The State Executive Council Meeting No. 36/2016 in October 2016 confirmed the decision of the MMKN No. 35 on 19 October 2016, agreeing that withdrawal from land acquisition under Section 35 of the Land Acquisition Act 1960 be carried out on all 35 lots of land in Kampung Baru Sungai Terentang involved in the alignment of the CAR 275KV electricity supply line rental project. This is because the new alignment for the TNB 275KV line from the Bukit Tarik main intake substation to the Chubadak main intake substation was approved by the state authority in 2014, and Tenaga Nasional Berhad has already used the new alignment. In line with the MMKN decision, the Macro Section and Privatisation of the State Economic Planning Unit, through reference letter dated 19 May 2017, formally applied to the Gombak land administrators for the purpose of withdrawal from the acquisition involving the area in question. The process of withdrawal from land acquisition under Section 35 of the Land Acquisition Act 1960 has been completed, where State Government Gazette No. 2394 was issued on 22 June 2017, and all endorsements of Form D Land Acquisition Proposal that are owned by residents have been cancelled with effect from December 2017. Regarding the second part of the question about the existing transmission line towers, TNB has informed that it is in the process of issuing a tender for the demolition works of the towers and related structures at the Kampung Baru Sungai Terentang Rawang site. The tender process, appointment of contractors and actual demolition works of the towers and structures are expected to be completed within 6 months from now. Regarding the third part, the status of the land for the 33KV Electricity Supply Line Rental at Kampung Sungai Terentang. This is an old line. For the information of the Honourable Member, the right of way for the 33KV Electricity Supply Line Rental at Kampung Sungai Terentang is still under the right of way of Tenaga Nasional Berhad since the village existed in 1949. This is a long time, yes. This right of way was actually granted under the former British government to the National Electricity Board at that time. TNB confirmed that the rental line in Kampung Baru Sungai Terentang, Rawang, which was initially obtained through right of way under the Electricity Act 1949, is no longer needed and has been cancelled. Thank you.

Speaker

Rawang.

Tuan Chua Wei KiatPKR · PHRawangEN

Regarding the third question on the 33KV electricity supply line, the land is still under TNB. If so, will the same method be used to reacquire the land as was done for the 275KV line by the government.

Tuan Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

I did expect the Honourable Member to ask that question. I have indeed discussed this with TNB, and this is under the Electricity Act 1949. It only grants right of way, and after discussion they agreed that the site is no longer needed, so demolition must be carried out in this area. They will prepare/take the necessary steps to demolish this 33kV line, and I will obtain the implementation as quickly as possible. Thank you.

Speaker

Teratai.

Tuan Lai Wai ChongDAP · PHTerataiEN

Thank you, Mr Speaker, question Teratai No. 96.

Oral Questions — Financial Assistance to JMB or MCQuestions

Tuan Lai Wai ChongDAP · PHTerataiEN

96. Question to Y.A.B. Dato' Menteri Besar:- a) Apart from the Skim Ceria programme, is the State Government prepared to allocate some financial assistance to JMB or MC that are experiencing difficulties collecting maintenance fees, to help with the maintenance of JMB areas?

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Thank you Mr Speaker and also the Honourable Teratai. As of 14 November 2018, the state government has already provided financial assistance totalling RM60,233,138.43 to JMB or MC of low-cost apartments, to help ease their financial burden in managing buildings. So this assistance is as follows. The name of the assistance is Selangor Free Water Apartment, direct payment of the bulk water meter bill to Selangor Water Management, or previously SYABAS. A free water rebate of RM11.40 per unit, from 2010 until now. The number of recipients is 239 areas involving 68,124 units, and the value of the assistance is RM53,844,624.91. The second assistance is Smart Life Improvement for Quality Life, direct payment of fees to competent lift firms under lift maintenance contracts starting from 2017, involving 23 areas and 93 lift units, and the value of this assistance is RM1,388,513.52. Thank you.

Speaker

Ijok.

Thank you Mr Speaker, Ijok question no. 97.

Oral Questions — Waste ManagementQuestions

97. Question to Y.A.B. Dato' Menteri Besar:- a) Sub-question has been rejected. b) What are the steps or plans to overcome rubbish waste in the villages?

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you Mr Speaker. MDKS, with financial assistance from the Selangor State Government, has implemented domestic waste and bulk waste collection in traditional villages across the entire Kuala Selangor district since October 2017. One-off contributions have been channelled annually for two years. Thank you.

Supplementary question. Nevertheless, the rubbish problem in traditional villages still has a bad impact, because the council's excuse is that they do not pay taxes, because they are outside the area. This raises the problem of who is responsible, because the District Office also has no allocation to manage rubbish.

Tuan Ng Sze HanDAP · PHKinraraEN

There is no longer any problem in terms of allocation, because the state government has provided financial assistance since 2017. If the service quality of the contractor is unsatisfactory, I suggest the Honourable Member may escalate the complaint to the YDP (Yang di-Pertua), and I am confident the YDP will take immediate action.

Tuan Lau Weng SanDAP · PHBanting

Soalan tambahan.

Speaker

Iya Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you Mr Speaker. I would like to ask about this issue, which is that the cost of rubbish collection in traditional villages usually involves high costs, and whether good or bad, it is a cost to the PBT (local authority) and the Selangor State Government. Does the government know that there are some village residents in traditional villages and villages on agricultural land lots who are actually willing to pay a higher door tax so that the PBT can provide better and more comprehensive services in this regard? And if the residents are willing, can it be implemented in the near future to ease the financial burden of the PBT and the Selangor State Government?

Speaker

Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Yes. Thank you Mr Speaker. To the Honourable EXCO, we know that in towns or fishing villages where door tax is not collected, there are complaints that the PBT does not collect rubbish. Even now, sometimes it is once a week, and they complain whether the state government will monitor or provide assistance to villages like this, because we receive many complaints and are often told that village heads are scolded by residents.

Tuan Ng Sze HanDAP · PHKinraraEN

Regarding financial assistance from the Selangor State Government, that is a basic matter. If the Honourable Member can help the state government to persuade the owners to pay door tax, I can guarantee that the rubbish collection service can be implemented immediately.

Soalan tambahan.

Speaker

Ijok.

Is there any plan by the Selangor State Government to supply rubbish bins to the PBT? Supply rubbish bins to villages.

Tuan Ng Sze HanDAP · PHKinraraEN

Rubbish bins in villages. For next year, the state government has no plan to give free rubbish bins, but for the iron bins, we will continue distributing them to traditional villages that need them. Large rural bins.

Speaker

Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Thank you Mr Speaker. My question is number 98.

Oral Questions — Smartsel and High-Speed Internet in JenjaromQuestions

Tuan Lau Weng SanDAP · PHBantingEN

98. Question to Y.A.B. Dato' Menteri Besar:- a) What developments and initiatives have been taken by SmartSel to develop high-speed broadband internet infrastructure in the areas of Kampung Sungai Jarom, Jenjarom and Banting, Kuala Langat, since its establishment.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you Honourable Banting. At this time, a total of 36 Smart Selangor WiFi hotspots have been installed in Banting and 12 in Sijangkang. In an effort to provide broadband internet to the targeted public, among the main challenges faced is the lack of sufficient broadband infrastructure to supply services in rural areas. To address the issue of broadband coverage, SmartSel Sdn Bhd (SMARTSEL) was established in 2017 to explore and find alternative solutions for providing internet services to areas that still have no internet access, including by planning and developing a digital core network (Core Network) with permission. SMARTSEL, in collaboration with local and international telecommunications partners, has already begun planning and developing a digital core network (Core Network) specifically for Selangor, including installing this core network in rural areas in phases. That is all, thank you.

Speaker

Silakan Banting.

Tuan Lau Weng SanDAP · PHBantingEN

Once again, this is an exercise that involves state government costs, that is, taxpayers' money. My question is: since internet infrastructure is a very important utility, just as important as electricity and water supply, which must be provided by developers, why does the state government insist on going to the PBT to place or require developers, regardless of the size of their development, to report or contribute and build this infrastructure, just as they build pipes for water and lay cables for electricity supply? Cables for internet core network infrastructure are also needed, and this does not only happen in kampung areas. Luxurious, modern housing estates, even expensive bungalows, have no supply, not only internet but even telephone lines. I think this is an anomaly that the Selangor government needs to address.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you. For now, in Selangor and across the whole country, there is a new demand from TNB to install fibre. For the future, we need to plan so that, like other utilities including water and electricity, developers must provide this internet infrastructure facility. The Selangor State Government is working together with Telekom Malaysia and the parties involved to obtain allocation from the optical fibre replacement plan and national connectivity impact from the Ministry of Communications and Multimedia Malaysia, TUSP Fund, to ensure fibre coverage in potential industrial areas and rural areas. In future, we will ensure that all these facilities can be provided by developers. It is not only that there is demand; we have only just started this work. That is all.

Speaker

Sijangkang.

Thank you Mr Speaker. My question, I am not sure how to put it, but if we could get a guarantee from the state government for the Smart Selangor WiFi service, because when we take services from computers that use Unifi, its speed is very good compared with this Smart Selangor WiFi. This has a bad impact on the state government, and for some of the hotspots in my area, we propose that they be closed temporarily until there is a guarantee from the state government, because sometimes it gives a rather bad impression. My question is, if there is a guarantee from the state government, perhaps next year, three months from now, or how? Thank you.

Tuan Hee Loy SianPKR · PHKajangEN

I must acknowledge first that the current WiFi installations are indeed rather unsatisfactory in speed. I acknowledge there is a problem, and that is why we established SmartSel, to improve the existing speed. Give us a little time. We will launch SmartSel WiFi 2.0, which is faster and better, to replace the old one. Be patient a little.

Speaker

Sungai Kandis.

Tuan Mohd Zawawi Bin Ahmad MughniPKR · PHSungai KandisEN

Thank you Mr Speaker. Sungai Kandis question no. 99.

Oral Questions — Youth DevelopmentQuestions

Tuan Mohd Zawawi Bin Ahmad MughniPKR · PHSungai KandisEN

99. Question to Y.A.B. Dato' Menteri Besar:- a) What is the total number of youths sponsored by the State Government from 2008 to 2018, by their respective fields? List them. b) What are the State Government's plans to enhance their potential in their respective fields? c) What is the government's view on the Selangor Youth Council (Majlis Belia Selangor) and the associations under it?

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you Mr Speaker and Sungai Kandis for asking the question. Honourable Members all, if we count and assess the number of youths and young people involved in state government programmes from 2008 to 2018, I think the figure reaches more than 100,000 programmes involving social programmes, gotong-royong, sports and so on. However, in the facts I will explain, these are programmes that provide specific sponsorship to individual young people and youths so that they join certain programmes and also some projects organised by the state government, because if we look at the figure of 100,000, it is very difficult to assess the effectiveness and sustainability of the programmes because they involve social activities. First, Honourable Members, starting from 2014 the state government opened participation to young people, especially among local youth workers or local youth activists and selected NGOs, for programmes implemented in collaboration with the Institute of Social Sciences Studies, Universiti Putra Malaysia (IPSAS), which has expertise in youth development. The diploma offered is the Diploma of Youth in Career, which provides sponsorship of RM9,400 per person, and we have sponsored 23 people. Therefore, in 2014, the state government spent around RM216,200.00, and they have only just completed their studies in 2018. For 2018 until 2021, a total of 30 young people or youths will be offered at a cost of RM10,000 each, and it will cost approximately 300,000 for the people. Honourable Members all, through the technical skills programme implemented under Inpens, the state government has sponsored a total of 3,983 people to join programmes whose costs include tuition fees, hostel fees, a meal allowance of RM11.00 a day and a cost-of-living allowance of RM150.00 a month, and the cost of this sponsorship is valued at RM6.026 million. Meanwhile, from our calculation, about 13,000 young people or youths considered under 40 years old have been assisted in the Hijrah Selangor programme out of a total of 46,000 as of September 2018, who have been given financing from RM5 to RM50,000.00. Honourable Members all, to strengthen and empower the groups that we sponsor and finance, the state government has implemented several programmes and several improvements, among them the establishment of Inpens College, which I mentioned earlier. Providing training to SPM school leavers, students who have dropped out of school, unemployed youths, and youths interested in technical and vocational fields to learn knowledge and skills for training. Second, to meet industry demand, the state government has collaborated with the Selangor Human Resource Development Centre (SHRDC), which functions as a partner with industry to determine skills and competencies in certification programmes, namely implementing talent development programmes especially for school leavers, graduates and workers from the industry itself. The employment placement rate for participants of this programme has reached between 95 and 100 per cent. Among the programmes implemented are industry-based training programmes of 3 to 6 months in fields such as mechatronics, semiconductors, ICT and others. Post-SPM school leaver programmes for talent development in mechatronics and solar, and skills programmes for unemployed youths. Talent development in ICT, semiconductors, footwear, mechatronics and others. Third, the Jom Kerja programme in the form of a carnival held in all districts in the State of Selangor, with open interviews, walk-in interviews with companies that need workers. Fourth, cooperation with Kumpulan Perangsang Selangor Berhad or Kumpulan Darul Ehsan in implementing the Selangor Graduate Employment Stimulus programme, now known as the Selangor Citizens' Career Scheme, aimed at helping Selangor graduates and citizens of the state of Selangor who still have not found employment and at enhancing their knowledge and self-empowerment, by providing training in the form of general skills, soft skills or other technical skills. And fifth, the Smart Selangor technical and professional skills initiative programme has been implemented and provides the following initiatives. First, education and training programmes focusing on fields required by industry at seven training institutes in the State of Selangor, covering five main fields, namely life sciences, food and beverages, manufacturing, electrical and electronics, and transport equipment, machinery and equipment. This is the focus set by the Selangor State Investment and Industrial Committee. Second, among the programmes implemented is, for the category of SPM certificate school leavers, a skills training programme in collaboration with industry to increase added value for SPM school leavers workers so that they can enter technical fields in line with the skilled workforce planning and the companies involved. In addition, to support sufficient talent for industrial transition in Selangor towards Smart Manufacturing applications in line with the challenges of Industry 4.0, the High Impact Talent Internship Programme is implemented involving graduates in engineering fields. Third, through cooperation with Strand Aerospace to meet the very high demand in aerospace fields, offering quite lucrative salaries. Fourth, the total participation until October 2018 is 1,197 people. In professional programmes, we will ensure that 80% of students or trainees who undergo training will get existing job opportunities. Honourable Members all, as for question C, the state government from 2015 onwards has opened opportunities, apart from implementing programmes through local youth workers, also through programmes with youth NGOs, and one NGO that we can regard as a good partner in future is the Selangor Youth Council (Majlis Belia Selangor) or MBS. However, in the few years before 2018 we faced some constraints and obstacles, because I understand that this is due to political factors, but the state government is also willing to cooperate if they are ready to cooperate for comprehensive youth development. Thank you.

Speaker

Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Thank you Mr Speaker, my question is 100.

Oral Questions — 100. Welfare Home Assistance Such as Homes for the Elderly, Orphans, OKU and OthersQuestions

Tuan Leong Tuck CheeDAP · PHPandamaranEN

100. Question to Y.A.B. Dato' Menteri Besar:- a) Can the Selangor government provide financial assistance to help welfare homes such as old folks' homes and orphanages under the federal government? b) Apart from financial aspects, what assistance can be provided by the government to ease the burden of welfare homes?

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Pandamaran. Pandamaran has asked whether the Selangor state government provides financial assistance to help welfare homes such as homes for the elderly, orphanages and those under the federal government. In principle, Honourable Pandamaran, financial assistance is indeed not given directly, but the state government always takes an interest in and cares about welfare homes, which we call voluntary welfare organisations. So for a voluntary welfare organisation of this kind, the state government has allocated as much as RM500,000.00 a year to these non-governmental bodies, including welfare homes such as homes for the elderly and orphanages, and this is assistance in financial form. It is based on applications and on the needs of the welfare homes concerned. In addition, the state government also designs empowerment training programmes for supervisors and workers in welfare homes, covering management, communication and stress management. The state government is also prepared to offer any services to these welfare homes that are not included in the services under the Department of Social Welfare (JKM). Next, Pandamaran also asked, apart from financial matters, what other assistance the government can provide to ease the burden of these voluntary welfare organisations. We all know that not all of these welfare homes are under JKM. So these are private welfare homes. Apart from financial assistance, if they are registered, yes Honourable Member, grants such as administrative grants, ration grants, per capita grants and repair grants are financial assistance. There is other assistance provided to ease the burden of welfare homes, among them support for applications for tax exemption under subsection 44 (6) of the Income Tax Act 1967, and secondly, advocacy campaign services implemented by the Department of Social Welfare (JKM) aimed at helping operators or registered welfare homes. The objective of this campaign is to gather all operators of unregistered care centres for advocacy purposes. Furthermore, to provide explanation and understanding to care centre operators regarding the provisions of the Care Centres Act 1993. Also, to provide exposure on the registration process based on the minimum standards set by the Department of Social Welfare (JKM). To give unregistered care centre operators the opportunity to meet representatives of technical agencies at the same time and place. A one stop centre service for these Voluntary Welfare Organisations, and to improve the quality of government agency services through strategic cooperation and to facilitate the public in expediting the registration process. Thank you.

Tuan Leong Tuck CheeDAP · PHPandamaran

Soalan tambahan.

Speaker

Silakan Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

To the EXCO, I want to know whether we help all the welfare homes we have. There are 2 types of welfare homes: one is a welfare home run for the Federation that is non-profit, and there is one type that generates profit, where the family members, the family members have to pay. Do we help both of them, or do we only help the non-profit ones. Thank you.

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Pandamaran. Of course, Pandamaran, for the type of welfare home that is profit-motivated while providing services, the government certainly will not help them, because they make a profit, Honourable Member. Thank you.

Speaker

Gombak Setia.

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Honourable Speaker, five siblings, only one left. My question is 101.

Oral Questions — 101. SME IndustryQuestions

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

101. To ask the Y.A.B. Dato' Menteri Besar:-

(a) What are the efforts of SITEC to empower the SME industry in the field of e-commerce in order to increase the contribution of the industry to the country's Gross Domestic Product (KDNK)?

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker, the Selangor Information Technology & E-Commerce Council, better known as SITEC, is the main driver in promoting the digital economy in Selangor through programmes related to E-Commerce, Startups and Smart City. The estimated economic impact (Gross Merchandise Value) achieved by SITEC is RM93 million. An incubator measuring 11,000 square feet, better known as the Selangor Digital Creative Centre (SDCC), has been awarded Malaysian Digital Hub status by MDEC. The Malaysian Digital Hub is an initiative to help provide working space, or with permission core working space, to local and international companies to connect them with the digital business ecosystem in ASEAN at the global level more effectively, and this is a great recognition of SITEC's efforts to develop Startups in Selangor.

Among the advantages obtained from this Digital Hub are the following:-(i) Corporate tax exemption for local and international Technology Startup companies. (ii) Technology Entrepreneur Programme (iii) Access to financing or funding, with permission (iv) Coaching and guidance, with permission (v) Low cost offers for running broadband or intellectual-based businesses (vi) Freedom of ownership for foreign companies to invest.

SITEC's strategic partner in e-Dagang education, Mystartr, has also signed a cooperation agreement with Alibaba-Taobao University to bring in the Ali Baba Global Entrepreneurship Course, which promotes Cross Border E-Commerce to help Selangor traders increase exports and penetrate overseas markets.

Through the SITEC Online 100 and SITEC Apps 100 Programmes organised, SITEC has trained as many as 425 SMEs in Selangor who run online businesses, with a gross turnover recorded at RM10.3 million throughout the programmes.

SITEC has also conducted free e-Dagang classes for SMEs or IKS so that they can add skills and knowledge regarding the world of e-Dagang that can be applied to their businesses. As a result of the amount of turnover, we can see how the e-Commerce industry is growing not only at the domestic level but also at the international level, such as

with the existence of DFTZ, where IKS traders can market their goods overseas easily.

SITEC has also carried out programmes that help Startup companies, where programmes such as Startup Quest and Hackathon have given exposure and opportunities to these Startups to present their new business ideas that can be commercialised, with the help of government agencies that provide opportunities to obtain grants or financing. This year SITEC organised the Selangor Accelerator Programme 2018 (SAP), in which as many as 27 Startup groups took part, and through this programme, the 10 best groups were also selected to present their businesses in China during the exhibition held in Hangzhou, which attracted more than 1 million online views while it was running.

SITEC has also successfully organised three Smart City conventions or conferences from 2016 to 2018. Among those involved and attending were individuals, IKS, MNCs, government services and international companies as well as the government. This programme has also attracted more than 20,000 people since 2016. The Smart City events touched on topics such as AI, Blockchain, Cloud, Big Data, Smart Transportation and Mobility, Waste Management and much more. Speakers and representatives from China, the UK, Indonesia, Spain, Taiwan, Singapore, Barcelona and Silicon Valley attended to share their views and experiences in smart city management. More than RM75 million in GMV from exhibition participants was also achieved through these events. Thank you.

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak Setia

Soalan tambahan.

Speaker

Gombak Setia.

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Thank you, Honourable EXCO, for the answer which I think is good, considering that SITEC is quick to develop various e-commerce platforms for entrepreneurs in the state of Selangor. However, I think, in the effort as explained just now, in SITEC's effort to develop entrepreneurs to participate in e-Commerce, what else is there, or does the state government have a special programme to attract more entrepreneurs, especially small entrepreneurs in rural areas who today develop local products, so that they too can participate in the e-commerce platform that we are developing in the state of Selangor.

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Thank you, Honourable Gombak Setia. Yes, the State Government through SITEC has indeed conducted online training to help small industries in rural areas, and on the 22nd of this month, SITEC, led by the CEO of Invest Selangor, will take 10 IKS, 10 people from Industri Kecil Kampung, to Hangzhou, to the headquarters of Ali Baba, to be trained, and in fact before they go, they will be trained and they will also attend courses in the campus of Alibaba-Taobao University, Hangzhou, so that they can be listed on the Ali Baba platform. Therefore we hope this opportunity will open up more space for small industries from Selangor to join this Cross Border e-Commerce business, and efforts will be continued, where in this delegation, apart from the 5, there are 10 small industries and also 15 more IKS industries that will join together. That means a total of 25, and 10 are from Small Industries. Thank you.

Speaker

Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Yang Mulia Mr Speaker, my supplementary question is number 102.

Oral Questions — 102. Plastic Bags in SelangorQuestions

Tuan Leong Tuck CheeDAP · PHPandamaranEN

102. To ask the Y.A.B. Dato' Menteri Besar:-

(a) When will the Selangor Government fully ban the use of plastic bags?

(b) Will the government impose a charge on the use of straws?

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Honourable Pandamaran. Asking whether the Selangor Government will fully ban the use of plastic bags. Mr Speaker, at this time the State Government of Selangor, through the Free Plastic Campaign, imposes a charge of 20 sen for each plastic bag. This campaign aims to create awareness among consumers of the dangers of plastic bags to the environment and health. In line with the implementation of the Malaysia Road Map Towards Zero Single Use Plastic 2018 – 2030 which was launched by the Ministry of Energy, Science, Technology and Environment, namely MasTech, on 17 October 2018, the State Government of Selangor will fully ban the use of plastic bags by 2030, that is, we will follow in the footsteps of the Federal Government. The ban on the use of plastic bags will be implemented in stages with the cooperation of all Local Authorities (PBT). So we still have 11 years to find the best alternative to replace plastic bags. Mr Speaker, to answer the second question.

Selangor at this time has no plans to impose a charge on consumers of drinking straws, that is, plastic straws. However, in 2019, next year, plastic drinking straws will not be provided by default to customers but will only be given if requested by the customer, that is, this is also an intention of the Federal Government where straws are no longer served automatically, that is, restaurant counters will also not place straws for customers to take freely. If customers want straws they must ask and the restaurant operator will then give them. That is all, thank you.

Speaker

Pandamaran

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Thank you, Mr Speaker. To the Honourable EXCO, we understand that many operators or traders around Selangor have begun giving out plastic bags for free, and I understand there is no monitoring or very strict enforcement taken by the government, so they give them at will, and some still take 20 sen. So is there statistics on how many compounds have been issued to impose on traders for giving plastic bags free of charge. Thank you.

Tuan Hee Loy SianPKR · PHKajangEN

At this time we are still waiting for the compounds that have been implemented by the PBT, where we do not do it by force. We do not want it to become an issue where the use of plastic bags gives an impression of freedom to them. So we do not impose a high charge and we do not carry out raids or compounds directly against them. Only the PBT has the power to revoke or not renew the licences of these restaurant premises, so we do not do it by force or impose high compounds. We do this voluntarily, and we will also go through education in schools for awareness of this issue. We do not use a harsh way on this issue, and for the future we will consider where the PBT will take action against premises that are still unwilling to follow the directives of the State Government, that is, if they still give plastic bags free of charge, we will impose a heavier form of punishment.

Speaker

Seri Setia.

Tuan Halimey Bin Abu BakarPKR · PHSeri SetiaEN

Thank you, Mr Speaker, Honourable EXCO. Is there clearer information for these traders, because some traders say why were we not told earlier, or the information is unclear as to whether they must charge 20 sen or not. Some charge consumers, some do not charge consumers.

Tuan Hee Loy SianPKR · PHKajangEN

We have already held a campaign for three to four years now. I think if there are those who follow the intention of the Selangor State Government. So at this time not all premises are prohibited from using plastic bags. There is a misunderstanding, where for night markets and morning markets that sell wet goods, fish, it cannot be avoided. They can still use plastic bags, do not misunderstand, they are still supplied. So we only focus on the big supermarkets that use large quantities every day, such as 7Eleven, KK Mart, they use many plastic bags every day. That is what we are targeting. At this time we are focusing on the big supermarkets, but for retailers there is still no strict control over them. They can still use plastic bags for certain items, such as wet goods sales.

Speaker

Kota Damansara.

Tuan Shatiri Bin MansorPKR · PHKota DamansaraEN

Thank you, Mr Speaker. Just now I heard the answer from YB EXCO about straws. If customers ask for straws, do they have to pay for the straws. I seek clarification.

Tuan Hee Loy SianPKR · PHKajangEN

No payment, they are not charged, so only we do not supply them automatically, that is, to obtain a straw is not the reason. That is why I encourage especially women, if they still want to use straws, buy one stainless steel straw, women. Ha ha

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Mr Speaker, Standing Orders.

Tuan Hee Loy SianPKR · PHKajangEN

Women, and men too. There is no discrimination here because when they use lipstick, they use straws, it cannot be avoided. If possible prepare a stainless steel straw, keep it in your bag, always bring this straw, we must avoid using plastic straws. That is all, thank you.

Puan Elizabeth Wong Keat PingPKR · PHBukit Lanjan

Tuan Speaker.

SpeakerEN

I have never seen a stainless steel straw, and please, Bukit Lanjan.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

May I refer to the Standing Orders, or go directly to the supplementary question?

SpeakerEN

Go directly to the supplementary question.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Thank you, Mr Speaker, my supplementary question for the Honourable Kajang is whether the State Government can review the schedule or timetable to make the state of Selangor a plastic-free state. If we wait until 2030, I am not worried but I am confident that the plastic problem in Malaysia in particular will become worse. So although the schedule of 20@30 or 20@30 was proposed at the central level, the State Government has from the beginning led this campaign, so I hope the Honourable Member has a good question for the Honourable Member in this House.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Honourable Bukit Lanjan. I agree that eleven years is indeed long, long, but this is a schedule given by the Federation, but the Selangor plan, if possible, I want 2025, that is 6 years from now, but not 100%, giving some time, because we want suppliers who can produce plastic substitute materials. We have many proposals such as biodegradable plastic, paper, bags, and many more recycled bags so that they have volume, they can produce volume and at a reasonable price that can replace plastic bags. If this is what we cannot provide, it means plastic remains a primary choice. They will not use paper, bags or recycled bags. That is why we will emphasise in Selangor, our target is 2025 so that we here are plastic-free, but we need to give time to suppliers to produce the substitutes for plastic bags. That is all, thank you.

Puan Wong Siew KiDAP · PHBalakongEN

Mr Speaker, supplementary question.

Speaker

Ya Balakong.

Puan Wong Siew KiDAP · PHBalakongEN

Thank you, Mr Speaker, I want to ask the Honourable EXCO, apart from charges or what we call punishment for those who use straws or plastic bags, can the Government consider giving rewards, especially to restaurants that use stainless steel straws, if we can give rewards to those who provide stainless steel straws.

Tuan Hee Loy SianPKR · PHKajangEN

Poor Balakong, he cannot see him, so it must be different if they have to wear red shirts.

Puan Wong Siew KiDAP · PHBalakongEN

Buying now, buying now.

Tuan Hee Loy SianPKR · PHKajangEN

Like Seri Setia wearing a blue shirt, easier to see a bit.

SpeakerEN

Do not go into blue already.

Tuan Hee Loy SianPKR · PHKajangEN

Thank you, Balakong, that is a good idea. If we look overseas, there really are incentives given for not using plastic bags. So if we want to implement this here, we must discuss it with the PBT (local authorities), because this is not under my portfolio. Also, if we look overseas, when we do not use plastic bags we get incentives, such as free bus fares, so that people can go to places for free. These are also incentives. So, we can consider this in the future. I also hope that in the future we will not impose compounds on those who use straws, not only plastic for now, where for plastic too, when licences are renewed, we take action and we do not give compounds. For straws, I want to stress here that we will not impose compounds. We will only not impose charges, we will only not encourage the use of these straws so that we want to reduce their quantity. In the future we will run a tighter campaign, where it is possible that compounds will eventually be imposed, but we also think about the bad effects after compounds. Thank you.

Speaker

Permatang.

Thank you, Mr Speaker. My question is 103.

Oral Questions — 103. Rural Youth Residential Ownership SchemeQuestions

103. Asked of the Right Honourable Dato' Menteri Besar:

(c) Does the State Government have a home ownership scheme for young people in rural areas?

(d) Does the State Government have plans to help young people in rural areas own their own homes?

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Thank you to Mr Speaker and also to Permatang. Permatang asked about the Skim Pemilikan Kediaman Untuk Anak Muda Luar Bandar. In fact, so far there is no scheme specifically for young people in rural areas, but the scheme we offer is first home ownership for applicants. However, the State Government has no problem if a subsidiary of the State Government is prepared to build housing in rural areas that may be specifically designated or offered to young people in rural areas. So what needs to be done is to identify State land in rural areas and look at whether it is feasible to sell the units if they are built. Thank you.

Speaker

Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you, Mr Speaker, my question is 104.

Oral Questions — 104. Local Government ElectionsQuestions

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

104. Asked of the Right Honourable Dato' Menteri Besar:

(a) State the State Government's preparations to face the local government elections, as announced by the Minister of KPKT (Ministry of Housing and Local Government), which will be implemented within 3 years.

Tuan Hee Loy SianPKR · PHKajangEN

Mr Speaker, at present the Federal Government is still taking action to study the implementation of local government elections, including matters involving the Akta Kerajaan Tempatan 1976, Akta 171 relating to local government elections. So far, 2 series of workshops have been held by KPKT to discuss the proposed implementation of local government elections, namely on 12 July 2018 and 8 October 2018, where all State Governments and several PBT were also invited to share views and ideas. For information, a Local Government Convention will also be held on 10 and 11 December 2018, to be officiated by the Right Honourable Prime Minister, and one of the agendas to be discussed is local government elections. The State Government is still waiting until a policy is decided by the Federal Government. Thank you.

Speaker

Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Mr Speaker. My question is number 105.

Oral Questions — 105. Prevention of Container Depots in Traditional VillagesQuestions

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

105. Asked of the Right Honourable Dato' Menteri Besar:

(a) What are the efforts and initiatives of the State Government to overcome the problem of illegal container depots within the Kampung Tradisi Pulau Indah area, which cause damage to infrastructure such as roads?

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, Pelabuhan Klang. Based on the Rancangan Tempatan of Majlis Perbandaran Klang, lot 42020 of Kampung Tradisi Pulau Indah has been zoned as a residential area. The Council carries out continuous monitoring, issuing enforcement notices against development activities without permission, particularly illegal depots, under the provisions of the Akta Perancangan Bandar dan Desa 1976, Akta 171 and the Akta Jalan Parit dan Bangunan 1974, Akta 133. Prosecution action in court is taken if landowners or operators still defy the notices that have been served. However, action under Akta 172 takes a fairly long time before the court imposes a fine. It is recommended that integrated enforcement action be taken, involving action to seize land, breach of conditions, and under the Kanun Tanah Negara, or together with JPJ (Road Transport Department), and cutting off utility supplies from TNB and SYABAS, to give a more effective effect and lesson for offences of activities and erection of structures without permission from the Local Authority. Thank you.

Tuan Leong Tuck CheeDAP · PHPandamaran

Soalan tambahan.

Speaker

Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you for the explanation, Honourable EXCO. Regarding the problem of container lorry depots, or container lorry depots, in this area, which have existed for a long time, more than two years now, I have constantly raised this issue at the District Action Committee Meeting, but up to today the standard answer is still given, the same as the answer given in the Action Committee Meeting. The answer given by the EXCO means the same thing, so when can we take serious action to overcome this problem, because it has caused many road damage problems in the village area, and if we do not take action today, it is feared that even more container lorry depots will appear, because those that already exist are not being acted upon, so there will be even more new ones.

Tuan Ng Sze HanDAP · PHKinraraEN

Thank you, Pelabuhan Klang. In fact, I want to congratulate the voters of Pelabuhan Klang, because for two terms Pelabuhan Klang had no Honourable Member looking after it, but now there is a new Honourable Member who is diligent in going to the ground, and knows all the problems in every corner of Pelabuhan Klang. For the information of the Honourable Member for Pelabuhan Klang, the Planning Department is in the process of preparing three Papers to bring this case to court. This is a new development.

Tuan Leong Tuck CheeDAP · PHPandamaran

Soalan tambahan.

Speaker

Pandamaran.

Tuan Leong Tuck CheeDAP · PHPandamaranEN

Thank you, Mr Speaker. The Pandamaran State Constituency (DUN) is located next to the Pelabuhan Klang State Constituency, and many containers pass through here, so is the State Government able to... because we often encounter depots like this. There is also one in the Pelabuhan Klang State Constituency, where there is parking beside a school, and many times the PBT has taken action but has not been able to stop them from parking there. So can the State Government gazette or find a special place for them to set up depots in a location far from housing. Thank you.

Tuan Ng Sze HanDAP · PHKinraraEN

Indeed, in the plans of the State Government, we are looking for a suitable site to park large containers like these. In fact, at the last National Transport Council Meeting there was also a proposal for each state to look for a suitable site, but for now we are still in the process of determining which area is suitable to be the site for parking containers.

SpeakerEN

The Honourable Member for Sungai Pelek.

Tuan Liu Tian KhewDAP · PHSungai PelekEN

Mr Speaker, I think what is the harm in looking under the TNB line; we negotiate with TNB.

SpeakerEN

Noted, please.

Tuan Ng Sze HanDAP · PHKinraraEN

This we take note of. I have instructed that discussions be held with TNB on a suitable site for this purpose.

SpeakerEN

The next question, Sungai Pelek.

Tuan Liu Tian KhewDAP · PHSungai PelekEN

Mr Speaker, question 106.

ORAL QUESTIONS FROM Y.B. TUAN RONNIE LIU TIAN KHIEW (N56 SUNGAI PELEK)

TITLE: BUILDING A NEW HOSPITAL IN RURAL AREAS

106. Asked of the Right Honourable Dato' Menteri Besar:

(a) Village folk really need a hospital. Will the Selangor State Government cooperate with the Ministry of Health to build a new hospital in the Sungai Pelek State Constituency area and other rural areas in Selangor?

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Mr Speaker, thank you, Honourable Member for Sungai Pelek. The construction of hospitals, as the Honourable Member knows, is under the responsibility of the Federal Government. However, to meet the needs of residents in rural areas, the Federal Government also provides health clinics located near residents in rural areas, and with the implementation of the Skim Peduli Sihat by the State Government, Peduli Sihat panel clinics can help reduce congestion at hospitals and government clinics and bring care closer to rural areas. In the Sungai Pelek area, there are seven panel clinics that have registered for the Skim Peduli Sihat Programme, and their names are Klinik Ashfa dan Raja, Klinik Seri Sepang, Klinik Villatheam, Klinik I care, Poliklinik Penawar, Klinik RS Shiva Sdn. Bhd. And for the information of Sungai Pelek, since you asked whether hospitals in rural areas will be built further in Selangor, for the information of us all, Honourable Members, God willing, the land for Hospital Kapar is already available and it is in the process of the Federal Government calling for requests for comfoser and so on. So Hospital Kapar, God willing, is on the way for the State of Selangor. Thank you.

SpeakerEN

Please, Honourable Member for Sungai Pelek.

Tuan Liu Tian KhewDAP · PHSungai PelekEN

Mr Speaker, we do understand that the juru stasion for hospitals, including in rural areas, is a central cost. But rural areas such as Sepang, Sungai Pelek and Tanjung Sepat really do need a hospital too. It cannot be that all hospitals are allocated. And I thank the Right Honourable Menteri Besar, who has visited the Sungai Pelek and Tanjung Sepat areas and has also gone to a place where a suitable site for a hospital exists. And the land is already available. So I ask that the EXCO for Health please hold negotiations with OAS. Thank you.

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Member. For the information of the Honourable Member, the Selangor State Welfare Department has stated that, sorry, the Selangor State Health Department has stated here that there are 2 applications, namely Hospital Kapar and Hospital Semenyih. Hospital Kapar, God willing, is on the way, and if I may convey what... there is a hospital that has applied but there is still an area that has applied, but there is still a site or Sungai Pelek has stated that it has a site, I can, I can help bring it to the Ministry of Health, but they also have their own assessment, because they also look at the positions of other hospitals as well. Thank you.

Speaker

Ijok.

Thank you, Mr Speaker. Ijok would like to ask whether the State of Selangor has any plans to build a hospital. I have heard that there is an area sponsored by SELCAT. I want to know this. Please give clarification on who is building it and what level of Adun that hospital is, e-lever level 5 star or five star.

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Honourable Member for Ijok. Indeed there is a SELCAT plan to build a hospital. However, I apologise, I do not have detailed information and I will reply to the Honourable Member in writing. Thank you.

Speaker

Rawang.

Tuan Chua Wei KiatPKR · PHRawangEN

Thank you, Mr Speaker, my question is question 107.

Oral Questions — 107. UniselQuestions

Tuan Chua Wei KiatPKR · PHRawangEN

107. Asked of the Right Honourable Dato' Menteri Besar:

(a) What are the government's actions to ensure UNISEL can compete with other universities? (b) State the financial performance and expenditure of UNISEL. (c) State the recruitment performance at UNISEL since 2006.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Rawang and Mr Speaker. The top management of UNISEL has put forward several measures to ensure UNISEL can compete with other universities that have been established longer in Malaysia. 1. Programmes offered are reviewed in terms of curriculum suitability to meet the requirements and needs of industry; 2. Creating programmes with a niche that is easy to market; 3. Establishing a Programme Advisory Panel to ensure programmes keep pace with the changing times; 4. Allocating an adequate budget for marketing the University's programmes at home and abroad; 5. Ensuring the University's top management team is credible and has extensive experience in the required fields of expertise and has the best service track record; 6. The selection of membership at the level of the Board of Directors and University Council is of those who are credible, have good knowledge in academic or management aspects, and have diverse backgrounds; 7. Continuously upgrading the University's infrastructure, teaching and learning, and first-class campus environment; 8. UNISEL is a State Government University, and grants for education and research are prioritised. This is because the amount of research grants can improve the University's standing in the ranking of Higher Education Institutions; 9. Increasing the number of lecturers with PhD qualifications in all fields; 10. Making UNISEL a green campus that is attractive enough and can attract students to study here; 11. Providing free matriculation education to students in engineering, science and computer courses. Honourable Members, the following is the financial statement of UNISEL for the year 2016. Basically, UNISEL received total income of RM133 million, derived from fees, other operating income and State Government grants. After deducting cooperative and financing costs, in 2016 the balance sheet income recorded a surplus of RM30.04 million. For 2017, the income was around RM105 or RM105.06 million, from fees with a high porsche of around RM79 million, and also State Government grants of RM23 million. After deducting operating costs and financing costs, UNISEL's financial position recorded a surplus of RM3.99 million. Up to October 2018, with income of around RM97.7 million, from fees of RM63 million, other operating income of RM1.5 million, and also State Government grants of RM32 million. So far it has recorded a surplus of up to RM8.34 million. Sorry, for question c, if it is stated about recruitment, we understand that it is about administration or appointment of officers. From 2006 to 2018, this is the total of new appointments. From 2006 until 2018, we have selected and appointed 1,148 officers, of which in Year 20.. I will provide the exact number in writing later, yes. If we look at 2006, there were 95 officers from academic and administrative staff, up to 59 officers in 2018, of which 28 were from academic and 31 from the Administration Division, to replace officers who transferred or retired. And this is the total of new appointments: 1,148 officers have been appointed from 2006 until 2018. Thank you.

Speaker

Jeram.

Tuan Mohd Shaid Bin RosliBERSATU · PHJeramEN

Thank you, Mr Speaker. I wish to ask about the outstanding assessment tax of UNISEL to the Kuala Selangor District Council, where the arrears have reached RM6,874,989.20. So what was presented by the Right Honourable Menteri Besar regarding its financial rate is quite good, but its income tax has not been paid. I have been informed that if this large amount could be paid, it would help the Kuala Selangor District Council to prepare to become a Municipal Council. Thank you.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. The responsibility to pay taxes is certainly necessary, but I would like to remind that, based on what I presented earlier, a large part of the allocation of costs obtained by UNISEL comes from the State Government. Without the injections provided by the State Government, UNISEL's operating costs would face some constraints. However, after some transformation processes carried out by UNISEL's management, we have basically only been able to record profits on paper. This is paper profit that results from calculations and so on. But before that, the State Government's MBI (Menteri Besar Incorporated) had settled amounts of nearly hundreds of millions of ringgit Malaysia. These are debts involving the earlier concessions, which, if we were to tell the story, would be a long story, Honourable Member. God willing, the responsibility to pay will be carried out after UNISEL's finances and position are in a healthy state. And I would like to mention that the attendance and registration of new students at UNISEL are also very good. For the first time in the latest session, UNISEL has recorded for the first time registration of more than 1,000 new students registered at Degree and Diploma level at UNISEL. This is a very positive development, and we cannot be too ambitious (with permission) because there are some things that need to be improved, for example the star value or standard mentioned earlier. It has declined slightly due to several matters, namely issues concerning students from abroad and also in fields of study for which sufficient funds could not be provided by the State Government or UNISEL itself. Basically, at this time, UNISEL's opecs (with permission), or daily management operations, overhead for the year, God willing, can be covered by existing management. But for capek, I must know the age value of the university's buildings, which are quite old, so they need a little injection, and that is why the State Government is providing injections. Thank you.

SpeakerEN

Kuala Kubu Baharu.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Thank you, Mr Speaker. My question is 108.

Oral Questions — 108. Developer Registration System (SPEM)Questions

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

108. Asked of the Right Honourable DATO' Menteri Besar:

(a) State the total number of housing developers registered with LPHS (Lembaga Perumahan dan Hartanah Selangor, Selangor Housing and Property Board) since the Developer Registration System (SPEM) was established.

(b) Has LPHS ever blacklisted and circulated to all Local Authorities (PBT) the names of Board of Directors members of problematic developers? If so, state the details.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Thank you, Kuala Kubu Baharu. For the information of the Honourable Member, the Developer Registration System, or its abbreviation (SPEM), was enforced starting from 2007. As of November this year, the total number of housing developers registered with the Selangor Housing and Property Board (LPHS) through SPEM is 1,426, involving 2,455 projects in total. The Selangor Housing and Property Board (LPHS) has in fact previously blacklisted developers and also circulated the list of blacklisted developers to all Local Authorities (PBT), and the names of the Board of Directors were also, what-do-you-call-it, submitted together. So, those problematic developers have been, what-do-you-call-it, searched in the search of the Companies Commission of Malaysia (SSM) in order to be informed to the PBT. Problematic developers are not allowed to register their development projects through SPEM at the SSM level as an initial step to ensure they do not carry out any development until they resolve their problems. Usually they are blacklisted because they are involved in abandoned projects. When the project is completed or has been rehabilitated, their names are removed from the blacklist and they may apply again to be registered in SPEM. That is all. In fact, I have a rather long list, which I will submit in writing. Okay, I will read out 1 and 2. Perhaps the Honourable Member may be interested in these developers. Firm Beringin Sdn Bhd has been wound up. Firm Realiti Sdn Bhd was also wound up. Firm Litar Jaya Sdn Bhd has been dissolved. And Firm Kamus Sdn Bhd has been wound up.

SpeakerEN

Kuala Kubu Baharu.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Okay. I would like to ask the Honourable EXCO whether the blacklist can be obtained by the public from any source or from the LPHS website.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

So far, we, I will submit to the Honourable Member only this blacklist. It may change, perhaps, once the projects they are carrying out are completed or rehabilitated. But I see no obstacle if it is, what-do-you-call-it, displayed on the LPHS website. Thank you.

SpeakerEN

Honourable Members, the time has shown 11.30 a.m. Hereby I adjourn the first session for the next business.

Continuation of Motion No. 15 of 2018. Motion on Development Allocation 2019Motion

Secretary of the HouseEN

Next Order of Business. Continuation of Motion No. 15 of 2018. Motion on Development Allocation 2019.

SpeakerEN

Yes, I invite Bukit Lanjan to continue the debate.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Thank you, Mr Speaker. I wish to touch on 5 matters relating to the State Government of Selangor's Development Budget for the Year 2019. The first is on Page 197 P01 PK4 Social Code 04002 Orang Asli Development, where an allocation of RM100,000.00 has been proposed by the State Government. I would only like to suggest to the State Government that the allocation for Orang Asli development should be more than RM100,000.00, because in the state of Selangor we have a large number of Orang Asli villages, and although at this time we have a relationship that can be said to be better with the Department of Orang Asli Development at the federal level and also in the state of Selangor compared to 10 years ago, nevertheless we also need to have a sense of responsibility towards Orang Asli development in the state of Selangor, especially the infrastructure in Orang Asli villages. This is because if we, for example, want to raise the development or improvement of infrastructure in Orang Asli villages, usually, this is my experience over 10 years, usually their priority is not very high, especially if the proposal is raised at the level of the Land Office or the District Office. So, they need an allocation that is more serious and meaningful so that we can serve them.

The second matter I would like to ask the State Government is on Page 201 P01 PK17 State Special Project under Code 17014 to 17016 relating to the Textile Museum, the Stamp Museum and also the Japanese Garden. I understand that the original location of the Textile Museum and the Stamp Museum has changed, and I would like to ask where the new location of the Textile Museum and the Stamp Museum of the state of Selangor is. Secondly, I see that the Japanese Garden under Code 17016 has no allocation for this year. So, what is the latest status of the Japanese Garden? And related also to state special projects, I would like to ask the State Government what the latest status is regarding the state people's park that was announced in this august House, whether this project will be carried out, because after 2 years, since this project was announced in this House, we have not seen any progress, with permission, regarding this project. The fourth issue, I refer to Page 231 P13 JPS PK1 Flood Mitigation Project Development Code 01001 Petaling Flood Mitigation Project, which for this year has only an allocation of RM12,800. And the total for the Petaling district is only RM1 million. If we listen to the Honourable Members in this august House, there are many flood issues, and the Petaling district is among those that have been hit very badly by floods recently. For example, in my constituency in the state seat (DUN) of

Bukit Lanjan, there are several places where floods that never happened before have suddenly started to appear. So, for example, in Damansara Damai. In that area there was definitely no flooding, not even flash floods, but recently we have seen flood water entering people's houses. So, I would like to ask the State Government what the justification is for reducing the development of this Flood Mitigation Project, specifically for Petaling, to only RM12,800.00, and what action the State Government has if the flood issue becomes more serious next year. The fourth issue that I want to argue in this House concerns Page 215 Selangor State Forestry Department PK1 Forest Resource Strengthening Development. Selangor is known as a 5 Star state in the management of Permanent Forest Reserves in Malaysia. What are these 5 Stars?

1. In the state of Selangor we have a 25-year moratorium in which we have no commercial logging.

2. The Section 11 Enforcement Enactment of the National Forestry Act 1985 was tabled and passed in this august House, and only in the state of Selangor do we have this special enactment, under which Public Hearings are mandatory if any Permanent Forest Reserve is gazetted for de-gazettement.

3. We are the only state, one of the states in Malaysia, that enforces Section 12, Enactment (Enforcement of the National Forestry Act 1985), under which replacement of Permanent Forest Reserves must be matched with any forest that is gazetted.

4. Selangor is one of two states in the Peninsula where we have had an addition of Permanent Forest Reserve area since 2019, namely more than 12,000 hectares of new Permanent Forest Reserve gazetted.

5. Fifthly, if any Permanent Forest Reserve is de-gazetted from the state of Selangor, it is only for infrastructure projects and also for public amenities.

And these 5 Stars are recognised at the federal level by the Peninsular Malaysia Forestry Department and also by the former Minister of Environment and Natural Resources. So, I have a question for the State Government: why recently there was an advertisement in the newspaper where the Bukit Lagong Permanent Forest Reserve in .. supposedly will be de-gazetted. And this is not for public infrastructure, not for public amenities and so on, but for a housing project. I think this is a precedent, with permission, that is not good for the state of Selangor, because if we start with one project, later we will have more housing projects where developers will come and meet the

Most Honourable Dato' Menteri Besar or the Honourable Kajang, to obtain Permanent Forest Reserve land for housing projects.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Mr Speaker, the last point.

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Mohon mencelah.

Puan Elizabeth Wong Keat PingPKR · PHBukit Lanjan

Ya, silakan.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Considering that in this case the developer is PKNS, which is a state government body. Is the Honourable Member not proposing that, indeed, it is easy for PKNS to cancel its intention to develop housing in the forest reserve area and leave the forest reserve as it is, because this forest cannot grow back in 2 to 3 years; it takes dozens or hundreds of years to become what it is now. We should not disturb it if there is no strong reason. There is already quite enough other housing land in the state of Selangor.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

I strongly agree with the suggestion from the Honourable Bukit Gasing. I think, as an agency or GLC of the State Government of Selangor, it should be more sensitive to the policy of the State Government, and I am worried that it will not stop if we do not stop today. This area, I understand, is a Forest Reserve which, compared to the overall Permanent Forest Reserve in the state of Selangor, is a strip, with permission, that is very small, 20 hectares, located between Taman Amansiaga and Selayang Heights. I am not sure whether this area is under the Most Honourable Sg. Tua or the Honourable Taman Templer, this area. But it does not give a good picture, especially when in the state of Selangor we have a good image in the development, conservation and preservation of these Permanent Forest Reserves. I also understand that this land was in fact applied for and approved to PKNS in 2003. 2003, but we, especially Pakatan Harapan, were chosen by the people so that we do not repeat the bad things that happened before. So I do request the Most Honourable Sg. Tua and also the Honourable Kajang to look at this matter again. Review this matter so that this project will not continue. This Forest Reserve will not be de-gazetted, because in the state of Selangor we can certainly find very good land since its size is only 20 hectares.

The last point, Mr Speaker, concerns the Department of Environment, sorry, the Selangor Islamic Religious Department (JAIS). Page 245, P14 PK1 Code 01100 Petaling District. I see the list of Religious Primary Schools allocated for development next year. I was shocked because one Religious Primary School, which was approved in this House 5 years ago, its name has disappeared from this Budget Book. The name of this school is Sekolah Rendah Agama Damansara Damai. And, most recently, I was able to find an announcement by a former Menteri Besar of the State of Selangor, namely in 2017, dated May 23, announced at that time, 2 years ago, sorry, 1 year ago, that Islamic education infrastructure would continue to be enhanced. This is a news report published by Selangor Kini, and the former Menteri Besar, who at this time is still the Honourable Bukit Antarabangsa, made a very, very good announcement, namely, with permission, quote, The state government also approved the application to develop 3 more SRAs, namely SRA Bandar Country Homes, SRA Denai Alam and SRA Damansara Damai, with RM10 million for each development. So, meaning, this has been approved. It has entered the 5-year Budget Book; an allocation was announced last year, but next year I do not see SRA Damansara Damai, so I ask for an explanation from the State Government: what is the latest status of SRA Damansara Damai? With that, I would like to say thank you.

Speaker

Gombak Setia.

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Thank you, Honourable Chairman. I would like to begin the debate this morning by touching on Item PK7 Sub-item 07001 under the Sub-item Youth and Sports. Honourable Chairman, Gombak Setia welcomes the state government's effort to draft a Young Generation Development Blueprint 2018-2022 to empower the role of youth in the development of the State of Selangor. This is because this body is seen as the most important foundation, covering all strategies and action plans to unlock the potential of youth in building strength and resilience, and the social, economic and political development of the nation. It cannot be denied that education is a key competency for youth development. Therefore, pedagogy covering technical aspects and skills, I believe, needs to be strengthened further to produce human capital development that is highly skilled, productive and competitive in all fields pursued. I hope that the Young Generation Development strategy being planned must cover various aspects holistically, in terms of knowledge development, character building, skills preparation and entrepreneurship, covering the entire spectrum of young people, whether or not they have the opportunity to enter institutions of higher learning. Therefore, I would like to propose that more volunteer programmes, or with permission, volunteerism, be developed in the State of Selangor, and that focus be given to skills development programmes among the young generation, especially in villages or rural areas, with a focus on collaboration together with industry in the surrounding areas. Indirectly, I believe this will open up more job opportunities for youth, especially in rural areas.

Furthermore, Honourable Chairman, I would like to invite the whole House to refer to PK14, Sub-item 14008 under the sub-item Library, namely Equipment and Collection. This is because I believe that as a developed state, it is very significant for us to maintain or ensure that the value of knowledge and intellect continues to be upheld. However, I feel rather disappointed when I see that only a sum of RM200,000.00 has been allocated to the Selangor Public Library to add equipment and collection for 2019. I believe that in an effort to make this library a forward-looking hub of knowledge that is competitive with our information technology, we need to ensure that our libraries are refreshed with new works in the corpus and in various disciplines of knowledge, because I believe this is very important for us to ensure that Selangor always has new discourses, which can ultimately bring us in Selangor to embrace challenges, whether economic, political or social challenges, from time to time.

Likewise, Honourable Chairman, I would like to touch on item 14010, namely the International Works Translation Programme. It is rather regrettable for me to say that after implementing the programme of translating international works, or the world's great works, for several years, this time I do not see any allocation provided to ensure that these programmes continue to run. I believe that in our effort to make a paradigm shift from a labour-based economic industry to a knowledge-based economy, or knowledge economy, we must return to the tradition of knowledge in order to achieve what is termed greater intellectual advancement. Therefore, I believe that the translation of these great works must be taken seriously, because it is one of the important components in efforts to develop the nation. Earnest efforts need to be made in strengthening this field of translation to harness all available sources of knowledge by using our national language.

Honourable Chairman, I would like to touch next on items PK18, items 18004 and 18008, under the item Inisiatif Peduli Rakyat, namely the Worker Reskilling Scheme and the Golden Age Friendly Scheme. In the State Government's effort to develop a productive generation, efforts to upgrade and polish skills need to be implemented. Moreover, today we are faced with the phenomenon of an aging population, where I believe it is very important for us to help retirees, especially military retirees, by preparing them before they enter fields that are growing in the job market today. However, before we look only at the topic of reskilling, or the Worker Reskilling Scheme, I would also like to invite the House to re-examine item PK18, namely the IPR Programmes, because we are well aware that the State Government's intention, as presented by Y.A.B. Dato' Menteri Besar Selangor in the Budget Speech, concerns a new concept to carry out realignment of the IPR programmes, or the Inisiatif Peduli Rakyat. However, I would like to remind that in our eagerness to carry out this realignment, I believe we need to ensure that the ultimate goal is to ensure that the distribution of wealth is still carried out based on the principles of justice and compassion, as also emphasised by the Menteri Besar in the Budget Speech.

This prompts me to ask, because after I examined the items in the Inisiatif Peduli Rakyat, of the 42 programmes that we offered and presented previously, only 10 more are recorded in this book. So, what or where have the other programmes gone, or has realignment been carried out on these IPR programmes, such that of the 42 programmes only 10 are recorded in this book? And this demands that we all ask the State Government whether it has decided on a formula for how to realign these programmes. We are aware that there may be programmes that have already been offered at federal level, so to ensure that such a programme is not done, or does not exist, with permission, redundancy or duplication with the State Government, we may be able to realign such programmes. However, I think it is important for us to ensure that before realignment is carried out, Members of this House are also brought together to discuss, so that we can ultimately decide on a realignment formula.

And, I would also like to ask the State Government, because in the Menteri Besar's speech I did not see mention of several IPR programmes that I believe have high impact, which we previously offered and implemented for the people of Selangor, including for the B40 group. This is important because in the Budget Speech Y.A.B. Dato' Menteri Besar mentioned that we want to safeguard or ensure that the B40 group ultimately receives protection, but several of the programmes I mentioned earlier, the IPR programmes which we previously implemented specifically to empower and improve the quality of life of the B40 group, are not mentioned. Among them, I would like to ask what is the status of the programme for exemption of tax and also business licence fees for the B40 group? I believe this is very important because this programme has received much attention from the people, and it definitely has a direct effect on the B40 group in the State of Selangor, especially in improving their standard and quality of life. Likewise with the early intervention programme, or programmes where we look after children who are less fortunate. Will this programme be continued, and likewise several other programmes such as the Imarah Muassasah Haji programme, which we also previously implemented to look after pilgrims in the State of Selangor?

And, most importantly, in our effort to carry out this realignment, let us not only look at the B40 group, but we must also ensure that the realignment carried out truly looks after all segments of society in the State of Selangor. That is why I would also like to ask whether the State Government will next year continue the allocation for the Sikh community to look after this group. Because we are aware that previously there were allocations channelled only to the Chinese community and to the Indian community, but over the past few years, I believe two years ago, we decided to also look after the Sikh community in the State of Selangor, given that this community is growing, and from an allocation of RM500,000.00 two years ago, this year we have increased it to RM1 million. So, I want to obtain an explanation from the State Government on these issues, because, as I mentioned earlier, we do not want, in our eagerness to carry out realignment, in our eagerness seeing many programmes offered at federal level, for us at state level to take lightly the programmes we previously carried out on the pretext that we can rest these programmes on the shoulders of the Federal Government, only for us in the end to leave behind those who truly, really need it in the State of Selangor. Do not be angry, Mr Chairman. I conclude, thank you.

Speaker

Hulu Kelang.

Tuan Haji Saari Bin SungibAMANAH · PHHulu KelangEN

Thank you, Speaker. I would like to take part in matters relating to P01, PK8, PK12, 11, 14 and 17 and P08 – State Agriculture Department, PK6 and P10 – State Forestry Department, PK2. Firstly, when I touch on the Office of the Menteri Besar and the State Government Secretary, it touches on PK6, namely Kerajaan Prihatin. Within Kerajaan Prihatin there are named Kerajaan Prihatin, Plantation Workers' Development and NGO Assistance. For me, after leading and chairing the Poverty Eradication Committee, I found that the poverty eradication agenda has no focus in the administration of the Selangor State Government, and our Committee has proposed a recommendation report to the government to arrange for these poverty eradication programmes to be scheduled as one coherent theme. They may be scattered across the existing SO portfolios, for example if we look at PK5 – Education. There is the Plantation Workers' Children Education Programme. That is actually also themed on the poverty eradication agenda, and likewise if we look at the PK6 – Women, Welfare and Health portion, there are also welfare programmes. This also touches on poverty eradication. So, I would like to propose that all programmes that touch on Kerajaan Prihatin, which are themed and oriented towards eradicating poverty, should be arranged entirely so that

their objectives can be harmonised. And, therefore, when we talk about assistance to NGOs, that assistance should be in the form of collaboration. We will see this collaboration, for example, where NGOs have produced very useful reports such as C4, proposing the Malaysia Procurement Policy, which has a great connection with what is practised in Selangor, and likewise with a latest report produced by Greenpeas Malaysia, a very shocking finding which I will elaborate on later. Thus we hope that allocations for NGOs should be expanded, not only in the form of piecemeal small-scale assistance but as a collaboration that produces good work, such as one NGO recently, namely Pusat Komas, which organised what we call the Freedom Festival, where in that programme there was a screening of a documentary on The Story of Kam Agung. Kam Agung was a woman in the interior of Sarawak who gave birth to her sixth child under conditions which later caused her to fall seriously ill, and she is said to be a case of very great neglect and negligence by the Ministry of Health at that time. This incident happened 16 years ago and her family still seeks justice for that situation. So, we find that in this context the contribution given by NGOs to which we give assistance is very great if we approach them, with permission, in the way we call collaborative cooperation. That is the first. Next, I would like to touch on environmental programmes. I would like to congratulate the local authorities (PBT), especially PBT MBPJ and MBSJ, where in the waste recycling programme, recycling of waste materials including various activities, for example if we take MBSA, the profit and income revenue they obtained from the recycling programme last year was RM12,744.00. After that MPK RM16,000.00, MPAJ RM5,000.00. But for recycling collections across the whole area of MBSJ, Subang Jaya, it was RM1,105,668.00. This is an achievement that we should praise and commend. So, with that, we see that if this programme is run properly, with the right campaigns and the right education, everything will run well and will run more perfectly from time to time. And I would like to draw attention to the fact that this allocation should be regulated, because there is a new development in the context of what we call rehabilitation and conservation of disposal sites. This may be related to what is legal or illegal. But there is something new, namely the import of plastics in large quantities from China into Malaysia. The target location is Selangor. The places are Pulau Indah, Jenjarom and Teluk Panglima Garang, where today we find many abandoned factories have become centres for disposal, and eventually they are unable to dispose of them properly, so they burn them. And that is something that frightens us, because if it is not controlled, the plastics that will come to Malaysia will

exceed tens of billions of kilometres a year. So this is a latest report which I will ask NGO Greenpeas Malaysia to submit to every Member of the Selangor State Legislative Assembly. So that is the second. The third, I would like to state that P14 – Library, where a new village library is being built, has been allocated RM2,250,000.00. I expect part of it should be used in Hulu Kelang, because that is what has been publicised, and it has been estimated that the State Library has come twice to conduct a survey and review the site, which already has a building that needs some minor refurbishment. It is not an upgrade, because it is no longer a library, but it has been targeted to become a library that we can use as the new village library in Hulu Kelang. Mr Speaker, next, for the Menteri Besar's Department, I would like to touch on PK17 – Kem Ghaffar Baba Gombak. The allocation that was given in the year... in cost has been stated at RM6 million. I want to know what its status is and whether this will be used as an initial plan under EXCO Pendidikan first, where it will become a training centre for teachers and students? For me, if we synergise it with the plan we proposed, which was proposed by Hulu Kelang to EXCO Pelancongan, namely to make it a tourism area integrated with national interests, Zoo Negara and businesses in the village, Kampung Kemensah, the destination where Kem Ghaffar Baba is located, we make it a more cohesive village so that the facilities can be used for education and so on, and for tourism. Mr Speaker, I now move on to the State Agriculture Department. PK8 – Development of Herbs and Spices Cultivation. I am keen to draw the attention of all the Honourable Members to the allocation of RM2 million to develop a Herb Garden. If that choice has not yet been made, I draw the attention of all of you, of the Honourable Members, Mr EXCO, to choose one particularly special herb which is in Japan, on an island where they know this plant, they plant it in large quantities and eat it as their staple food, and their people are very healthy. The plant is suitable in Malaysia, the place being Batang Berjuntai, which we call Bestari Jaya. People feel awkward saying Batang Berjuntai, it sounds unpleasant. Bestari Jaya sounds a bit better. But the people who planted this plant said that the name Batang Berjuntai should indeed be retained. The merengga tree is the tree that... merengga. And this merengga tree is apparently a very special tree. Various benefits. It has four times higher vitamin A content compared with carrot, seven times that of lime and orange, four times calcium compared with milk, three times potassium compared with banana, and various other advantages including nine times more iron than spinach, bayam. And it involves various special facilities, more than 56 nutrients contained in it, and it is very easy to plant, easy to

process, and has many benefits, and if it is said that today the community in Bestari Jaya or Batang Berjuntai wish to make this into one... and they have negotiated with several agencies and departments in the local authorities to allow it to be planted in places they can look after and control well. So, I propose that the State Agriculture Department select this project as a pilot project and make it a project that will benefit us all. And, finally, I would like to touch on the State Forestry Department, where in PK6....PK3, yes? Herbal plants, herbs again, but the allocation of RM50,000.00, for me, in the previous session I asked, is this a research allocation to identify herbal seeds from the forest that have not yet been brought to the village, outside the forest, to be developed. So I would like to know what progress has been made and what reports, what reports have been made regarding herbal cultivation of this kind, more for R & D? Thank you.

Deputy SpeakerEN

Yes, please, Ijok. Do you want to comment on Batang Berjuntai just now? Go ahead. Ijok.

May I debate straight away?

Deputy Speaker

Ya, silakan.

Thank you, Deputy Speaker, for giving Ijok the opportunity to debate the Selangor State development budget. There are several issues I want to raise. The first, the issue of the Department of Irrigation and Drainage. This is a major issue. Flooding is one of the major problems in the Ijok area and also in Selangor. If we look at the development allocation for JPS, if we refer to page 235, PK2 and page 237, PK5, in terms of upgrading and drainage development, look there at Kuala Selangor 0. I am puzzled why there is no allocation at all for Kuala Selangor, when Kuala Selangor is an area that is prone to water and drainage problems. So, I hope the Selangor State Government and the Selangor JPS Department will explain why there is no allocation for this problem, and whether there are any plans to develop or build? That is one. The second, I want to touch on the allocation for the Selangor Islamic Religious Department. If we refer to page 246, PK1 – School Development. I have raised this many times in this House, to build one secondary religious school, because in Ijok there are seven primary religious schools. Every time the people of Ijok want to continue their religious education, they have to go to the school in Jeram or to Kuala Selangor. I hope the Selangor Government will build one secondary religious school in the Ijok area. So, our children do not need to migrate far to obtain further education. Deputy Speaker, I want to

touch on IPR, Inisiatif Peduli Rakyat. I congratulate the Selangor State for providing many benefits and many initiatives to the people of Selangor. But I want to touch on just one thing, on Health and Women's Development in terms of PK6, page 198, PK18201. Many initiatives have been given to women in terms of welfare, health, screening, various matters, from mental health for women, but I hope the Selangor State Government does not forget men. Men, although I am a female doctor, am concerned about men's problems, because when I am at my hospital, when a woman comes with a problem we have to study it in terms of the husband's side, the matter of men. Because sometimes the problem is related to that. So, what I want to suggest is that men now also have health problems on their own, such as prostate cancer, heart disease, lung disease, that is one in terms of health. In terms of social matters, our social structure has also changed. For single mothers and housewives there are schemes to help. But now it has begun, with permission, we have househusbands, not housewives. Many women are working but their husbands stay at home looking after the children. But do our programmes help men who become househusbands? They face the same problems as women. So, I see that in IPR there is nothing, empty, for us to help men to look after our own families. Agreed?

Deputy SpeakerEN

Ijok, are you proposing that there be a male EXCO member?

Yes. Perhaps. Thank you, all the Honourable Members. Ijok would also like to touch on the construction of the hospital mentioned earlier. EXCO has raised, as far as I know, I was told that a hospital will be built in Rawang, but the detailed particulars we do not know. This is a project of a Selangor State Subsidiary Company. In my view, as a doctor experienced in working and managing hospitals, Hospital Pantai Bhd., since 1990 when I became EXCO and also became a Board Member, and in building hospitals across Malaysia from Penang, Ipoh, Melaka, I find that investing in hospitals, building hospitals, we must be careful. What is our intention? What is our objective? Do we invest in hospitals to make a profit, or to provide health services to the people of Selangor? Because if we invest in a hospital, build a hospital to make a profit, in five years, with permission, return of investment is almost zero. And even if we do, we must cover maintenance payments. Many hospitals in this country, such as Subang Jaya Medical Centre, were taken over by Sime Darby. Prince Court, started by Petronas, has now been sold. Tropicana Medical Centre has been taken over. Many others, for example hospitals that were built, have been taken over. If we have extra money, such as access fund, to build a hospital, that's ok, if we want to build a hospital in English, CSR, to help the people, that's ok. If we have limited money and want to build a hospital to make a profit, I hope the State Government must be a bit careful, because if we use the people's money, I find this is an initiative by one company, a Selangor State Subsidiary Company, and where the allocation to build this hospital comes from. Its source, is it using the people's money or using the access fund that we have in excess? That is why I want to tell you, I hoped from the beginning, I have said, what are our priorities, with permission. We must outline what our parties are for the Selangor State, what problems it has, what development, roads, drains or schools, education, human capital development, but hospital development, health problems, is the main responsibility of Putrajaya, with the State assisting. That is why I hope the Selangor State Government will establish one priority, what we will develop for the Selangor State next year. That's all, thank you.

Deputy Speaker

Silakan Sementa.

Puan Dr. Daroyah Binti AlwiPKR · PHSementaEN

Thank you, Mr Deputy Speaker. Sementa would like to debate VOT P01 page 198, Project Code PK6 Women, Welfare and Health, with Code 06001 Women and Family Empowerment Programme amounting to RM4,940,000.00, of which part is allocation for PWB Programmes. So, alhamdulillah, PWB Programmes continue to be carried out so that we can keep empowering women in the State of Selangor, and I think the allocation of RM50,000.00 a year for the Supervisors in every state constituency across the State of Selangor, namely the 56 state constituencies, is a very good allocation for these women to carry out women empowerment programmes in their respective areas. Perhaps now the PWB Supervisors will also have an even greater task, namely identifying and seeking out these KISS mothers to be empowered through the Work From Home Programme. So I would like to propose that the State Government also be able to collaborate with Swing World Gallery, which is a company that carries out or makes products based on handcraft sewing. Handcraft sewing-based products from Swing World Galery are indeed very attractive. So I think perhaps these KISS mothers could be collaborated with to make handcrafts together, to be made into products that we can name as made in Selangor. Products such as toys, and also those with a Selangor look, for example firefly toys, toys of our tropical animals such as frogs, and so on, which are very cute. So they can be made into souvenirs and branded in the name of Selangor. So I see that in fact many of our PWB women have visited Swing World Galleryini before, and they were also given some training or courses. So if we can

collaborate, it will become even more beautiful, so that maybe we can make certain products to be made into souvenirs for the State of Selangor. Meanwhile, I also would like to see this PWB Shop implemented so that it becomes a one-stop agency for gathering products from across the State of Selangor made by women's hands, whether food products or handcraft products, where this PWB Shop can be made a place of visit by tourists who come to Selangor. If possible, we can implement it before the Visit Malaysia Year and also in conjunction with the Visit Selangor Year, so that we can market Selangor's products. We have a great many products in the State of Selangor, but we do not have one specific product that we can highlight as this is Selangor. So I hope this PWB Shop can be made a pioneer for us to make it a one-stop agency for marketing made in Selangor products.

Next, for B6002, namely Welfare. Sementa would like to ask how much allocation the State Government provides as contributions to EIP centres, or Early Intervention Programme centres, which educate our children who need special education. The EIP contribution from the State Government, which we have implemented since last year, is very much appreciated by the operators of these EIP centres, as it also indirectly helps reduce the educational expenses burden for parents who send their children to these EIP centres. So, will the State Government also extend this EIP assistance to the PDK-PDK in the State of Selangor, because these PDK-PDK also teach our children with special needs and they also have very little allocation to carry out the programmes needed at their centres. So Sementa hopes that these PDK-PDK will also be given attention to receive assistance through our EIP Programme.

Next, I would like to go to PK7, namely 07003, namely Sports Development. We are aware that the State Government does indeed focus on certain fields of sport, but there are some fields of sport or types of sports that receive less attention from the State Government or society. Among them, these are found in Sementa and their champions are in Sementa, such as Arm Wrestling. Semanta has a champion who has gone to take part in competitions even at the overseas level, and furthermore sports such as Muay Thai, Rugby, Motorsport and also team cycling, Cycling Race, where these sports actually also have many enthusiasts, many followers, many people or talents who are in this State of Selangor. So I hope the State Government will also look at and give attention, and furthermore provide the appropriate contribution to give support, and also so that we can polish these talents so that they can go even further to the next level.

Next, PK13, namely Malay Customs and Heritage. Dato' Selat Klang is not present. Sementa has 12 villages

at present, and when I go to the villages newly included within the Sementa State Constituency boundary, previously I had 8 villages, and now I have 12 villages. So when we go into these villages we can see various traditional heritage treasures that exist in these villages, which are indeed original to Selangor. So I think it needs an injection from PADAT so that our arts and culture do not rot in the rain or wither in the heat. So that they will continue to be actively involved in carrying out programmes and activities to further invigorate the existing heritage arts, among them the art of silat, of which there are various types, and young people are also involved, giving them the means to learn the art of self-defence, among them Silat Cekak, Silat Gayung, Silat Cemendi and Silat Saudara. These are among the silat styles I have found, and in fact there are many more types of silat, and we request that the State Government continue to provide support so that the heritage arts that still exist in the State of Selangor will continue to be nurtured. Apart from that, another heritage art found in Kampung Bukit Kapar is the traditional Gasing Pangkah game. I think only one or two villages still have the traditional Gasing Pangkah game, where the tops are made by the elderly themselves. They make these tops themselves and do not even sell them in the market, and they are always active in it and also in spreading it widely to young people. So I hope PADAT will also take into account this heritage art, which may be almost extinct. If this uncle is no longer around, there may be no one left who can make this traditional Gasing Pangkah and also know how to play this top. So these are among the things I hope for from PADAT regarding the heritage arts that still exist, and we do not want them to be lost to the passage of time.

Next, for the Selangor State Agriculture Department, PK11, namely Development of Target Groups and Young Farmers. So I would like to obtain information and feedback on who are the young people who are eligible and may take part, so that they can become one of the members to carry out this Young Farmers Programme together, and where the programmes or venues of this Young Farmers Programme are held in Sementa, where is it? So this is what I want to know, because many among these young people are also interested in agricultural knowledge. So I think when there is an allocation for the Development of Target Groups and Young Farmers, this is a good opportunity for our young people to take part and join together in this programme.

So next, I also want to go to the Selangor State Public Works Department, regarding PK4, upgrading road 4301, namely Upgrading of Route B1 and B202 from Pekan Meru to Puncak Alam, for which the allocation is only RM500,000.00. I just want to know what its status is now and when it will be fully completed, because there are several scratches on those roads that cause flash floods for village residents when the construction has not yet been properly completed. So those are among the matters Sementa wishes to raise. With that, I thank you.

Deputy SpeakerEN

Thank you, Honourable Sementa. I only want to mention a few small matters regarding the word "asli" that Sementa raised. Yesterday in the debate, Dengkil, in the Dengkil debate, said "Orang Asal", he said. I was once corrected by an officer of the Department of Orang Asli Development (JAKOA) at a programme when I used the word JAKOA. In fact, the Akta Orang Asli 1954 specifically uses the term Orang Asli. That is why, Honourable Members, when we go to the ground, do not use the term Orang Asal, because Orang Asal refers to the indigenous peoples of Sabah and Sarawak. This is for the benefit of us all. Perhaps the Honourable Member for Bukit Lanjan knows more about this matter. Yes, I give the floor to the Honourable Member for Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you to the Honourable Deputy Speaker. Pelabuhan Klang would like to take part in the debate on the 2019 Development Budget. Beginning at page 198, VOT P01, Project Code PK1313004, namely Research on Malay Customs, Language, Arts, Culture and Heritage. In the Pelabuhan Klang State Assembly (DUN) constituency, such as Sementa, there are also many villages, and one of the villages that has caught my attention is the Pulau Indah Traditional Village area. Within the Pulau Indah Traditional Village area there are 4 villages, namely Kampung Sg Pinang, Kg Sg Kembung, Kg Teluk Nipah and also Kampung Perigi Nenas. All of these villages have their own heritage and traditions, and originally they were an island before the West Port (Pelabuhan Barat) was built. They merely lived on an island with no facilities at all, and there is much history in the Pulau Indah Traditional Village area. And, inspired by the idea initiated by the former Village Head or former Chairman of the Village Development Committee (JKK), Dato' Zulkifli Wahab, who was also formerly Secretary of the JKK, and who before that was Secretary to the second Village Head, father Osman Lazim, who is still alive today at the age of 84. We have built or set up a Pulau Indah Heritage Museum in Kampung Perigi Nenas. This museum is an old building, namely a village hall (balai raya) built in 1974, one year after I was born. This village hall was built in the old style of village halls, using timber, and its architecture is still beautiful. Although it is no longer used as a village hall, we have repaired and completed it, and it has now become a museum. With a little assistance from the State Museum earlier, and I was also appointed as patron to manage this Pulau Indah Heritage Museum. So I request from the State Government, through PADAT, to help Pelabuhan Klang ensure this museum is given a small allocation so that we can continue to develop it. Because now it has become one of the places visited by tourists, not only from within the country but also from abroad.

Tourists who disembark at Star Cruise, and they have brought these tourists to visit this museum. Because inside this museum are many old artefacts and also the history of Pulau Indah, which originally was an island, and now it has developed rapidly, and around it there are a port and also an industrial area. How did they live without clean water from taps, without roads, without vehicles, yet they could live in those days, and this must be remembered by future generations. And I am fortunate because father Osman Lazim, 84 years old, is still alive although somewhat frail, and always gives me the spirit to continue ensuring this museum keeps receiving attention from the many parties who wish to help. And next, I go to still VOT P01, page 198, Project Code PK707002, namely Upgrading Sports Infrastructure. I hope that Pelabuhan Klang will also be given attention so that we are not left behind in the development of sports. I have an area at the Kampung Teluk Nipah Pulau Indah Sports Complex, but all the sports facilities in this complex are dilapidated and need improvement or upgrading of the sports facilities available at this Kampung Teluk Nipah Pulau Indah Sports Complex. All four of these villages make the Kampung Teluk Nipah Sports Complex a focal point for young people, especially for recreation and sport, there is a football field and a takraw court. But the facilities are all dilapidated, and I request that it be considered in future for upgrading by the State Government. Likewise, I have a football field in Pandamaran Jaya, Pelabuhan Klang, Jalan 9 and Jalan 100. But this football field is also used as a temporary retention pond during heavy rain. That means it is always filled with water, and there needs to be the latest technology to ensure it can also be used as a temporary retention pond, but it must also ensure that the water retained is quickly diverted out into large drains as soon as the heavy rain stops. But now, even after three days of rain, this field's water still has not receded, because perhaps there are blockages here and there. And I very much hope this field will be upgraded for the benefit of our young people to play football. And for the next one, I go to page 219, VOT P12, Public Works Department of the State of Selangor (JKR Negeri Selangor), namely Construction of Bridges and Footbridges. The Pelabuhan Klang DUN would like to request that a study be carried out in front of Sekolah Kebangsaan Kampung Pendamar so that consideration can be given to providing a footbridge for the use of our pupils who study there. Because the road here is very busy, so much so that Jalan Kampung Pendamar has as many as 9 speed humps. That is why people call it Jalan Kampung 9 Bonggol, because there are 9 speed humps. This road, and I think these speed humps are perhaps an old method, and it is time a footbridge was provided for the convenience of our children to cross the road. And next, PK4, a sub-item of PK4.

Upgrading of road at page 223, I also request the State Government to consider what I said in the earlier debate, namely upgrading Jalan Kampung Pendamar from 2 lanes to 4 lanes, because of the density of the new developments surrounding Kampung Pendamar, such as Bandar Parklands, Kota Bayu Emas, Greenville, and this has made the road very busy. Because the development in the areas of Bandar Parklands, Kota Bayu Emas and Greenville has 4-lane roads, but suddenly they connect to only 2 lanes at Kampung Pendamar. So it is time Jalan Kampung Pendamar was upgraded from 2 lanes to 4 lanes, just like the roads in Bandar Parklands and also Kota Bayu Emas. And next, I, Pelabuhan Klang, also request that the roads in the Pulau Indah Traditional Village area, such as Jalan Rahman, Kampung Teluk Nipah, Jalan Dato' Ahmad Razali, Kampung Sg Kembung, Jalan Dato' Hormat, Sidang Mohd Noor, Jalan Dato' Harun, Jalan Dato' Mohd Taib, Jalan Sidang Sidin, Persiaran Masjid Sultan, Jalan Imam Yusuf, Jalan Sidang Osman, Jalan Uda Aziz, Jalan Uda Habib, are all under the responsibility of the Public Works Department (JKR), and I request that the JKR consider upgrading these roads and installing road signs and also village name signs, namely Kampung Sungai Pinang, Kampung Sg Kembung, Kampung Teluk Nipah and also Kampung Perigi Nenas. Road signs need to be installed, and a study on safety aspects should also be considered because of the increase in population; previously there were few, but now it has reached as many as 10,000 people, because many new housing developments have started to rise in the Pulau Indah village area. A study on safety aspects needs to be carried out, especially at road junctions, because many accidents have already occurred; perhaps speed humps or traffic lights are needed at the junctions within the Pulau Indah village area. And next, I go to VOT P13, page 230, Department of Irrigation and Drainage, namely Project Code PK02 Upgrading of Drainage, and also PK7 Development of Mechanical and Electrical Infrastructure. As everyone is well aware, Pelabuhan Klang is located along the coast and is always exposed to the problem of flooding. Especially when high tides coincide with heavy rain, the village areas in Pelabuhan Klang will be affected by flash floods. So this causes great hardship to residents and damages property. And I would like to request the Department of Irrigation and Drainage to review the areas that need to have water control gates or sluice gates built on rivers, such as Sungai Tengkorak, Kampung Perajurit, Telok Gong. Here there is a water control gate or sluice gate, but it is old and needs to be upgraded. And there also needs to be a sluice gate at the Sungai Udang Kg Baru, Telok Gong, jetty area, and also to build a new sluice gate at Lorong Udang Galah 2, Jalan Udang Galah Telok Gong, Sg Pendamar, and also to upgrade the sluice gates, and there also needs to be a high-capacity permanent pump house at Kampung Sg Kembung and also at Kampung Sungai Pinang, Pulau Indah. This is to overcome the problem of flash floods that always occur when heavy rain coincides with high sea tides. And also I request the Department of Irrigation and Drainage, as the Honourable EXCO, Y.B. Batu Tiga, has informed, regarding a study to be carried out on the drainage and gully system within the village areas, and I request the Honourable EXCO to help Pelabuhan Klang in two large village areas, namely Kampung Pulau Indah, comprising Kampung Sungai Pinang, Kampung Sungai Kembung, Kampung Teluk Nipah, Kampung Perigi Nanas, and also including Kampung Teluk Gong, which has five villages, namely Kampung Nelayan, Kampung Baru, Kampung Hamid Tuah, Kampung Perajurit and Kampung Tengah, to be studied in these village areas too, and there needs to be planning to upgrade the drains, which, if possible, should be changed to calvert drains in future. And next, I go to VOT B14, page 244, namely the Selangor Islamic Religious Department, namely PK30300, namely building mosques. Pelabuhan Klang would like to request and ask the Selangor Islamic Religious Department to carry out a study in the area where there are three villages, which Pelabuhan Klang would like to request be considered for building a new mosque, namely in the Masjid Pendamar area, because the existing mosque can no longer accommodate worshippers, as it has a capacity of only 500 people during Friday prayers. Given the very rapid development now taking place all around the Kampung Pendamar area, such as the growth of new towns like Bandar Park Land, Kota Bayu Emas and also Green Vill, and this has made many worshippers come to perform prayers, especially Friday prayers, at Kampung Pendamar, but this mosque can no longer accommodate the large number of worshippers, so I want to propose here that the land is already available, but the mosque has not yet been built, and I request that a mosque be built in Kampung Pendamar that can accommodate 3,000 worshippers at one time. And Pelabuhan Klang also wishes to request a new mosque in Kampung Sungai Pinang. The land is already available, because the existing mosque here can no longer accommodate the increase in worshippers, because there has also been an increase in new housing areas in Kampung Sungai Pinang, Pulau Indah, so it is hoped that the Department of Islamic Religion can give priority to the construction of a new mosque in Kampung Sungai Pinang. Likewise, in the Pandamaran Jaya area, the existing mosque can also no longer accommodate the increasing number of worshippers, and the mosque in Pandamaran Jaya needs to be upgraded, because the land is available but it requires an allocation from the State Government to realise the aspiration of the Mosque Committee to build a new mosque in these areas. And next, I go to the last one, namely VOT P16, page 254, PK1, Selangor State Town and Rural Planning Department, namely PK 1 – Development Planning, PK2 Policy Planning, PK3 Special Planning Projects. So here I would like to propose to the Selangor State Town and Rural Planning Department that we have heard many problems raised by Honourable Members regarding infrastructure problems, especially in areas close to Pelabuhan Klang, where these areas are mixed, with industrial areas, residential areas, and I request that the Selangor State Town and Rural Planning Department review the existing policies, and whether it is still appropriate for industrial areas to be placed close to residential areas. Do not think only of profit or only of developers' proposals, but aspects of safety and infrastructure problems in future must be taken into account. I will give an example of the problem that arose in Kampung Pendamar. Okay, when this warehouse was built, its activity at that time was based on timber, and it used the Kampung Pendamar river to transport timber products, or as people say, to be used as a logistics route, but when the timber business was no longer profitable, it was changed to another activity, namely becoming a warehouse for storing fertiliser, and now the impact on residents around, there is a religious school there, there is a mosque there, there are village housing areas there, and the impact around there is nuisance, where fertiliser dust flies around the area of one village, and it has been reported several times in TV3, but until now there is still no action, and now when bringing goods such as this fertiliser into the warehouse, they use container lorries. These container lorries pass through the roads close to the housing estate and also the village road there, and eventually another problem has arisen, such as roads being damaged, and we then have to repair those roads. When there is a warehouse there, there is also the open land that has been cleared, and now it has also become a container lorry depot. So how long will this issue take to be resolved? We can discuss it at length in this House, but if there is no clear policy, because when I discussed with the Planning Department at the Klang Municipal Council, the reason given was that the land can be used because the zoning is there, it is permitted. So they do have the right to build or develop the area. That is why the zoning of areas suitable for industry, suitable for warehouses, needs to be reviewed...

Tuan Rajiv A/L RishyakaranDAP · PHBukit Gasing

Mohon mencelah.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Ya.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

I was interested in the Honourable Member's argument. Is the Honourable Member proposing to move all these warehouses out? Does the Government need to pay compensation to acquire the land? What exactly is being requested?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

If we want to resolve what already exists, it is rather difficult because it involves cost, involves law, and many matters, but I want for the future. I give an example, I give an example of new planning, I give an example of what is new, I give an example of what is new...

Tuan Adhif Syan Bin AbdullahBERSATU · PHDengkilEN

Honourable Member, give him time.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

I give an example of what is new. There is also a proposal to build a warehouse in the Kota Bayu Emas area on commercial land, and it was brought to the Klang Municipal Council, and it was approved in principle with conditions. Now, of course, it is a large warehouse for vehicles or cars, but in future, and it is adjacent to the Kota Bayu Emas housing estate, and residents have already objected, but when we refer to the Planning Department, it is commercial land and it is permitted because the zoning is correct. But are we still going to continue the old policy of placing commercial land next to residential land? As long as there is a specific commercial area there, there will always be applications.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

So Honourable Member, what is the proposal, because we know that land has been zoned commercial, do you want to take back that land?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Now, if we want to take it back, it is not possible. If I say who will take it, who will pay, who will bear the cost, but for future planning, future planning. We need a control, because I told them, if it is a car warehouse, I have checked car carriers or trailers that can carry cars, carrying eight cars at one time, and their weight is already 30 tonnes, and these will pass through the road of that housing estate. The housing estate road can at most have a capacity of 10 tonnes. So if this policy is continued, it will never be resolved. It has reached a point where it is necessary that if a residential area is a residential area, and an industrial area is an industrial area, that means the zoning is what must be changed.

Tuan Adhif Syan Bin AbdullahBERSATU · PHDengkilEN

Honourable Member, may I interject.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Ya.

Tuan Adhif Syan Bin AbdullahBERSATU · PHDengkilEN

I am very interested in this issue, and in my own area, in my own residence, a similar incident has also occurred, as was raised by Pelabuhan Klang, and as Bukit Gasing stated just now, we ask what more specific proposal there is for Pelabuhan Klang to resolve this issue.

Deputy SpeakerEN

This is like a repetition of Bukit Gasing.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

That is why I bring this matter to this honourable House. I feel that we have reached a stage where, after discussions with the local authorities (PBT), there needs to be a new policy from the State Government to be given to all PBT in the State of Selangor regarding the areas that may be developed for industry and the areas that are only for housing estates. As for commercial, do not take it that commercial land may be built on at will. That is, if commercial means light industry, heavy industry, shophouses, there are many kinds. So, if an area is a housing estate, there should only be shophouses there. Do not, when taking the commercial name, be allowed to build a large warehouse. Right now it may be a car showroom, but in future, when cars no longer sell, the warehouse will already be there, and they will fill it with other activities. I will give an example now at Taman Teluk Gedung Indah, a housing estate that shares an entrance and exit road. On the side there is a semi-detached industrial area, and now there is also a small container lorry depot there, below the water tank. So I feel, how do we control this, because we who permit these activities are indirectly allowing them to happen. Therefore, there must be a clear guideline given to the PBT on which areas may be approved for these industrial activities.

Deputy SpeakerEN

One minute, Honourable Member.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Okay, so I think that is enough here. It's actually almost finished, but earlier there was an interruption.

Deputy SpeakerEN

Finish up until one o'clock, there is one more minute. Please interject, Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Under the Planning Country Act 1976, it is indeed the responsibility of the PBT to prepare local plans. You, Honourable Member, were previously a Klang councillor responsible for preparing local plans, and what is the zoning that those local plans specify? If it is a commercial type, what type? Commercial Type 1 is only for shoplots, Commercial Type 2 is only allowed for warehouses, Commercial Type 3 allows restaurants and so on. Perhaps the Honourable Member has discussed this with the MPK, has he not?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

I like that question, because indeed we do have local plans. That is why I said it is business zoning, commercial zoning, but it is the business activity that needs to be controlled, and that is already correct. Yes, I was a councillor, and of course I know about the PBT. But when the planning permission is submitted, that is when we look at it, and at that time they take advantage by using the business name to build a warehouse, or whatever it is that is wrong.

Deputy SpeakerEN

Does the Honourable Member want to continue or to end?

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

I want to end.

Deputy SpeakerEN

Alright, thank you, Honourable Member.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Okay, so I really hope that from now on, like in this case, they do not take advantage. One more example..

Deputy SpeakerEN

One more example, Honourable Member? Wrap up, wrap up, Honourable Member.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan Klang

Satu minit.

Deputy SpeakerEN

Not allowed, Honourable Member. Wrap up.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Wrap up, yes. Planning permission is granted for land works, but the land works are not carried out, and the approval of the planning permission is taken advantage of, and the land is used to dump rubbish on these lands. That is one more example.

Deputy SpeakerEN

Alright, thank you, Honourable Member.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

That's all, thank you.

Deputy SpeakerEN

Yes, Honourable Members all, the time has shown 1.00 p.m. Therefore I adjourn the House until 2.30 p.m. The House is adjourned.

(The House adjourned at 1.00 p.m.)

(House Resumed) (Deputy Speaker in the Chair)

Deputy SpeakerEN

Good afternoon, Honourable Members all. The House resumes. Please proceed, Bandar Utama.

Puan Jamaliah Binti JamaluddinDAP · PHBandar UtamaEN

Thank you, Mr Speaker, for giving Bandar Utama the opportunity to also debate the Development Allocation Motion 2019. Mr Speaker, in this debate I only want to focus on one matter, because I feel this matter is important and I want to spend time debating this issue, namely under the heading VOT P01 Page 200 Project Code 150005 under the Selangorku Housing Project. I understand that the Ceria Scheme allocation is included under this Project Code although there is no detailed breakdown of figures in the Selangor State Budget estimates.

So, first of all, I want to express my appreciation to the Selangor State Government because under the Ceria Scheme this time there is no longer any cost-sharing between the State Government and residents, because the State Government is willing to bear the entire cost, understanding the difficulties of residents who find it hard to pay costs. Sometimes even maintenance charges are difficult to pay, let alone additional costs. Therefore, we really appreciate the Ceria Scheme, but I have also been informed that the Ceria Scheme allocation has actually been reduced. So, perhaps it can be corrected, and if I am wrong, please correct me, but around 2017 this scheme had an estimated allocation of RM25 million. In 2018 it was RM13 million, but this did not include the Smartlife Scheme, amounting to RM12 million, and Indah Smart Selangor, amounting to RM10 million. In 2019 only RM10 million has been allocated, and this includes all allocations or welfare assistance offered by the Selangor State Government, especially to low-cost flats. But until now there are more than 300 applications under the Ceria Scheme, including civil works such as painting, repairing roofs, repairing water tanks and so on. Secondly, lift maintenance, and thirdly, and most importantly in my view, the migration from bulk meters to individual meters. Therefore, I am actually rather concerned: is an allocation of RM10 million enough to help us, if not to settle the costs of low-cost flats in Selangor, then at least to address the problems of flats that are facing very serious issues regarding the welfare and environment of their flats. So, I feel that we here in this honourable House, we all understand that any maintenance and repair of infrastructure should be the responsibility of the JMB; this I think cannot be disputed. However,

if we do not have a way, a solution to the issues of low-cost flats that have arisen, in my opinion, eventually the State Government will have to spend more allocations in solving all these problems. If we take the Bandar Utama State Assembly seat as an example, when one of the low-cost flats under the Bandar Utama State Assembly seat, namely Pangsapuri Damai, was unable to pay its water bill and SYABAS decided to cut off the water to that flat, can we really close our eyes and not acknowledge that this issue has arisen? Because, can we really bear to see hundreds of families living there without water? And what is the public perception of the Selangor State Government regarding that incident, even though we all admit it should be the JMB's responsibility. Indeed the JMB should resolve issues or issues like this. So, in my view, we should seriously seek a solution to this issue.

I realise that the State Government has in fact helped its low-income citizens a great deal by offering affordable or low-cost housing, which is indeed needed. For that, I do want to thank the State Government for truly serving the people of Selangor. However, an issue also arises here. After these houses are provided, what if residents of these houses are unable or unwilling to pay maintenance costs? What further action will the State Government take? I feel this is an issue that we need to consider, because under the Selangor State Government there are actually many low-cost houses or low-cost flats, so will we propose a path for the relevant parties to facilitate or expedite the processing of tribunal cases, or will additional powers be given to the JMB, namely that they will be given the right to cut off residents' water if residents refuse to pay the water bill to those who use bulk meters. I feel these issues must be discussed seriously and thoroughly, because if we do not discuss this issue, and what is it, the Ceria Scheme allocation is also reduced at the same time, I will consider this later, the Selangor State Government will bear more serious costs in the future when many low-cost flats are unable to pay maintenance costs like this, and when, all at once, at some point later, we will have to solve all these issues. As I said earlier, because I feel most of these issues, whether it is water or lifts. If the lift in that area is broken, for example, but the building in that area is 10 storeys, are we going to make grandmothers and grandfathers climb the stairs? So, I hope that while we are looking for a solution to this, I hope the allocation for schemes like this will not be reduced in the future, so that we have allocations to solve these serious issues. Because in my view

if we do not have allocations for these issues, what will happen if an area really cannot pay its water bills, or they do not have the initiative to encourage them to pay their water bills. And after that, what action will the Selangor State Government take when that issue happens? Can we simply not provide assistance when SYABAS cuts off the water, and does this mean the basic right is being blocked? So, with this, I hope the views of Bandar Utama will be considered, and I will end my debate here. Thank you.

Deputy Speaker

Subang Jaya.

Puan Michelle Ng Mei SzeDAP · PHSubang JayaEN

Thank you, Deputy Speaker, for giving Subang Jaya the opportunity to debate. Subang Jaya wishes to raise four issues from the 2019 Budget. Firstly, it is the issue regarding water. I refer to Page 200 under PK16 concerning the Development of the Selangor Water Supply Project. I notice that this allocation is the largest allocation under the Development Budget under the Office of the Menteri Besar and the State Government. I believe this effort is to increase the water reserve margin in Selangor, in addition to focusing attention on the main infrastructure, namely at the water treatment plants. I also hope that the Selangor government will pay attention to two other matters. The first is the problem of non-revenue water, with respect. In Selangor, the problem of non-revenue water can reach 35%. This means that for every 100 litres of water produced at the water treatment plant, only 65 litres reach consumers, due to pipe leakage, water theft and faulty meters. I hope that attention will be given to proper repairs; that is the first.

The second, we also have a demand problem. That is, demand from consumers in Selangor. In Selangor there is a very serious problem of water wastage. Our consumers use 231 litres per person, per day. But if we compare this with international standards, namely statistics from the World Health Organization, with respect, they use only 160 litres, 165 litres per person, per day. This means that Selangor consumers use 40% more water than our counterparts at the international level. And in my view, we also need to focus attention on running awareness campaigns like what is being done in the United Kingdom, where teams water, the body that manages water in the UK, runs a campaign such as a 4-minute shower. And this is effective because it reduces water usage. If we can reduce water usage, the water reserve margin will also increase, because they are related. So, I hope that apart from focusing on infrastructure, we also

focus on soft development, with respect. That is about water. The second, I refer to Page 197 under PK1 concerning the Smart Selangor Delivery Unit. I would like to propose on behalf of Subang Jaya that the Smart Selangor Delivery Unit study developing an app, with respect, to centralise complaints from the PBT. In Subang Jaya there is a problem where complainants want to obtain feedback from those handling their complaints. But the feedback they receive is only automatic feedback, namely an e-mail stating that your complaint has been received and registered under this number, like this. But after that, they do not know what happens to their complaint. How is it resolved? And if it is resolved, what is the quality of the repair? I feel that, now that the Selangor State Government wants to enter, especially Industry 4.0, we need to invest in applications like this so that all PBT can use the same application, because although some PBT have applications, they are scattered. The development of these applications also differs. So, if we can standardise application development, I think all Selangor citizens can benefit from that technology. That is the second point concerning the Smart Selangor Delivery Unit.

Thirdly, I refer to Page 199 PK14 concerning Libraries. I note that investment for libraries is being made in rural areas, but I also hope that perhaps in the coming Budget, focus can also be placed on urban areas such as Subang Jaya. In Subang Jaya there is a dense population and there is indeed demand for libraries. Now, what residents do is set up a library in their own neighbourhood, where they donate books and open the library perhaps only one week at a time. Given that there is demand, and given also that Subang Jaya has 27 schools and in addition 4 major universities, 4 private universities, namely INTI College, Sunway University, Monash University, SEGI College and also Taylor's College. Sorry, 5. 5 colleges and universities, yes. I think one public library can definitely benefit the people of Subang Jaya. Fourthly, I refer to Page 219 under PK1 concerning the JKR on Various Plans. I have applied through Written Questions, concerning the Subang-Kelana Link. It is understood that it is a federal road and there is no plan to upgrade the road. I am somewhat disappointed with this answer because this is not a question to solve the problem but a question for long-term planning. Why do I say that? Because if anyone goes down to Subang Jaya and looks at the design of the Subang Kelana Link road, anyone will feel that the design of this road indeed has a problem, because it comes off one highway and descends onto a local road. Then there is a traffic light where they have to wait to exit onto another highway. So, given that we need to consider traffic entering from one highway to another highway, waiting on a local road, this will create a long-term problem. I am also informed that there are traffic dispersal efforts by MPSJ, and that has eased the burden somewhat. But the JKR's answer that traffic volume is under normal and sufficient conditions, I feel is not quite right, because according to the Engineering Department under MPSJ, that road, Persiaran Kewajipan, which is a local road, can only accommodate 2,000 cars per hour, but now the load has surged to 4,000 cars per hour. This means there is a 100% increase without traffic dispersal by MPSJ. The problem will arise, but my point is that when designing any road, we need to think about the long term. We need to think about traffic for the long term, not just build a road to solve the problem we face now. Because if we solve this year's problem, when traffic increases next year it will create the problem again. So, I hope that now, according to the JKR, it is impossible to upgrade the Subang Kelana Link road because there are constraints from the road reserve, very high land acquisition costs and so on. And my point is that if we plan properly from the beginning, it will not create problems like this, where we have road reserve problems, land acquisition problems and so on, because we will think about these problems from the very beginning. So, for me, since we are a caring government that wants to lead Malaysia to a more advanced level, we, meaning all of us as agencies, yes, I think we need to be more proactive than reactive. We do not just want to solve problems merely for the moment. But we want to be proactive in terms of thinking long term: what actions must we take today to solve problems 20 years, 10 years from now? That will ease our burden now. But indeed we, as ADUNs, as agencies, need to work hard now, and I believe that with the effort and the focus we have in this new government, we can achieve that dream. That is all from Subang Jaya, Deputy Speaker. Thank you.

Deputy SpeakerEN

Seri Setia first.

Tuan Halimey Bin Abu BakarPKR · PHSeri SetiaEN

Thank you, Deputy Speaker. I have a few matters to raise this afternoon. The first is PK9, Vote P01, page 198, concerning PBT Basic Facilities. Here in Selangor we are already an advanced state, but there are still old basic facilities that have not been renewed even though we are moving forward. So I hope that something to be done under this vote does have an allocation. But it should be stressed that these matters must be upgraded at every PBT in this state of Selangor.

PK3, Vote P01, Entrepreneurs. Regarding entrepreneurs, I feel called to touch on this matter. What I want to say this afternoon is that entrepreneurs must also be seen as entrepreneurs in the city. Sometimes we look too much at entrepreneurs in the rural areas, as they are termed, but we must remember that there are also many entrepreneurs in the city. I take as an example the area of Seri Setia. Seri Setia is an area under urban poverty, and there are entrepreneurs in this area who sometimes themselves have not been given exposure to these entrepreneurship programmes. When I asked them, they only said that many entrepreneurship programmes focus on rural areas. That is why I hope that entrepreneurs in urban poverty areas like this will also be looked at and given attention.

Vote P01, page 199, Libraries. I offer my sincere thanks to the Selangor State Government, to the Selangor Public Library, and to MBPJ, the Petaling Jaya City Council, for setting up a Community Library in my area. I also recommend that community libraries be available in each respective area. However, I would like to request one addition. I would like a Community Library to be set up in the Lembah Subang area. The Lembah Subang area is one whose condition we know to be poor, where residents, or the children, are sometimes neglected. Neglected in terms of their education. Their social situation. So I hope a library will be established in areas like this. Because when we have such a library, I take as an example the library that was built at Kampung Lindungan, which has had a very significant impact. Our children's truancy, truancy from the community library. Sometimes when parents themselves have problems with transporting their children or other problems, they will send their children to the Community Library. So I recommend that a Community Library also be set up in the Lembah Subang area. Insya-Allah, with this community library, problems among children and social ills will be curbed.

Next, PK2, Vote P01, page 197, Rural Development Project. In the Seri Setia area there is a village that also bears the name Kampung Hamid Tuah. Likewise my friend in Pelabuhan Kelang. The Kampung Hamid Tuah area is one that is categorised as within the city, but the village area looks neglected. The village is located behind Taman Mesra Batu 3, and we pass through that area with its overgrown bushes, and the drains, which I observed, are not well maintained. There are still residents, but the land is large, perhaps the distance between one house and another is quite far. I hope this village, Kampung Hamid Tuah, will also be given attention in terms of its infrastructure and its other facilities.

PK18, Vote P101, page 196. PK18 concerns the Peduli Rakyat Incentive. I may be somewhat confused, so may I seek clarification: is the back-to-school programme, the provision of free bags, included in this? If we look at before, free bags were provided to every Adun, with quotas. But this time there are none. Is there really no planning, or is there truly no provision of these free bags to every Adun to give to our residents? Perhaps it is not enough, there may indeed be a quota, but a small one. At the very least it could reduce our burden and add to the small amount provided by the Selangor State Government.

And for PK, Vote P13, page 231, I want to express my thanks to JPS. If we look at this budget book, a project to upgrade or involving the Taman Mesra area has been included. Flooding in this area has been a long-standing problem. I consider this area to be an urban flood-prone area. Only I hope this project can be expedited. It is true it is next year, but if it can be expedited that would be good, because it has been years. I think our Exco from Pandan Indah once served as a council member there. And he knows this problem has been around for a long time. Whenever it rains, it floods. Urban flooding, and it affects other areas as well. I humbly request that this project be expedited and that their problems there be eased. That is all, Deputy Speaker. Thank you.

Deputy Speaker

Dusun Tua.

Thank you, the Honourable Member, Mr Speaker, for giving Dusun Tua the opportunity to debate. I only wish to touch on a few matters. First of all, under P1, project code PK7. If we look at the allocation for the younger generation and sports, almost RM10.2 million has been allocated for matters relating to sports, regardless of whether it is development or infrastructure. However, only RM4.9 million has been allocated for youth development as a whole. I believe this is because we often assume that when we channel allocations to sports, it is automatically also for the younger generation. Whereas I am convinced that the younger generation today has diverse interests and diverse inclinations, and not all of them are focused solely on sports. Therefore, always placing sports and the younger generation in one and the same basket is, in my view, an outdated practice. And it requires a reform so that we truly focus on the holistic development of the younger generation. I hope more allocation can be given to youth development, and that the allocation can then be channelled to programmes involving skills, innovation, and also health. Not only the health of men, yes, for Ijok. The health of young people is not only physical health, and as has been raised by my other friends, it also involves the mental health of the younger generation today.

Next, I want to touch on PK in the same vote, PK10, in which the state government has allocated as much as RM3.5 million for tourism promotion and events. What I see in Selangor is that we have many tourist attractions which are in fact no less impressive when compared with other states. But what needs to be improved is actually the way we promote our tourism products. True, we have large billboards owned by the Local Authorities that we can use. However, billboards alone without quality and consistent branding are wasteful. I would like to propose that the state government try to spend this promotion allocation first on creating an attractive, fresh and creative branding. My experience of having served on the PBT-level Tourism Technical Committee has shown me firsthand how we sometimes place less emphasis on branding itself. Usually graphic designs are made perfunctorily and are shabby. And usually there is no clear concept. As if it has become a custom that must be accepted. In fact, among us who are regularly involved in the design industry and the like, we often make a joke that if a design or the like is not very nice, we name it a "government design." That is the joke among industry practitioners. Because of this, sometimes it happens because we would rather let anyone who can use graphic design tools, even if weak in the skill of creating design concepts, make the designs, rather than truly spending a little money to find experts to help us. I hope this does not happen at the state level, because I am convinced that with the existing allocation we can produce good branding, provided we truly give that task to those who are truly experts.

I also want to touch on Vote P01 again, project code PK13, Research on Malay Customs, Language, Arts, Culture and Heritage. I am in fact interested in knowing the details of the studies or research being carried out or about to be carried out that will receive this allocation. I believe that in the past there were also researches carried out and marked by allocations from the state.

However, it would be a waste if all this research were only kept in ivory towers or museums. I would like to propose that the results of this research be published, whether in the form of books, documentaries, or any other new medium, so that its benefits reach the general public. Thereby further enhancing appreciation and respect for Malay customs, arts, culture and the heritage of Selangor. Thus, it is hoped that the additional allocation in the future will help to spur efforts to ensure these research results can be appreciated by the community. And I also feel there needs to be cooperation between the responsible parties and the Adun and Dun in Selangor to jointly promote projects for appreciating Malay customs, arts, culture and heritage.

Next, still under P01, where project code PK16 is the water pipe replacement project. I am somewhat disappointed to see there is no allocation for the water pipe replacement project for the year 2019. Let me give an example from my own area of Hulu Langat. We often face the problem of low water pressure, and when we make complaints, we request that the water pressure be raised a little, and so on. The common reason usually given is that the pipes in the Hulu Langat area are old pipes. If the water pressure is raised, it will cause the pipes to burst, be damaged, and so on. So this low water pressure usually disrupts the water supply, especially in areas that are somewhat high. Pipes that have existed for a long time should be replaced and upgraded. So I recommend that water pipes that are too old be given due attention by the state government for replacement. Moreover, areas that still have not received treated water supply, whether because there are still no pipes or, more ridiculously, the pipes are already there but there is no water. These too must be addressed promptly. I also hope the state government can give attention to this matter, because while we often say Selangor is the most developed and most outstanding state and so on, our responsibility is to ensure that treated water, which is a basic human right of the people, can truly be enjoyed by the people.

Under Vote P12, I wish to touch on PK1, where I am also somewhat disappointed because there is no allocation for installing street lights. Yet there are still many state roads under the supervision of JKR (Public Works Department) that do not have adequate street lights or have no street lights at all. I will give an example, once again in my area: roads such as Sungai Tekali, and those who may have ever travelled up Bukit Ampang from Hulu Langat, the road is still dark and unlit. And this endangers road users, not only at night but also those who go out early in the morning. Early dawn, it is dark. So I hope the state government can consider an allocation for installing street lights, because there are still state roads under the supervision of JKR that require street lights. And it should also be noted that the Hulu Langat area is where cyclists are. So these cyclists usually go out early in the morning in the dark, cycling as far as Sungai Lui. For details, perhaps you can ask Seri Setia. He is diligent about cycling. So this is also dangerous for cyclists, even though this is among the main tourist attractions in the Hulu Langat area. And speaking of this lighting, there is actually a rather sad story. Once, at night, I received a WhatsApp message from the Deputy Minister for Women, former Speaker, the Honourable Hannah Yeoh, asking me why the Hulu Langat area looks like the interior of Sarawak even though it is located in Selangor. So this is the situation. Let us not, when we say our state is developed, always focus on the city areas, whereas many suburban areas sometimes look like rural areas. Because of a lack of basic infrastructure like lighting alone. We need not talk about other things, just lighting. So these are the matters I hope will receive attention from the government. Thank you.

Deputy Speaker

Sentosa.

Tuan Gunarajah A/L R GeorgePKR · PHSentosaEN

Thank you, the Honourable Member, Mr Deputy Speaker. I refer to Vote P, page 200, sorry, page 198. The year 2020 is the Visit Selangor Year. There are about 13 months left. We, we will hold campaigns in conjunction with... We ask that, if I may say so, Sentosa, we must hold campaigns to make the Visit Selangor Year a success, especially in terms of cleanliness. Many local authorities (PBT) do not have special machinery to help clean up conditions. Although we have KDEB, which helps provide rollers and garbage trucks (with permission), we do not have them. The PBT do not have machinery such as water jetters and other machines, like a Schwarze road sweeper (with permission). This is one thing. If we look at developed countries, even the streets in small districts are assisted with machines like road sweepers and so on. The PBT need to obtain assistance, or the state government needs to help PBT that have less capacity, so that we can continue to progress in terms of cleaning up the districts, our respective state constituencies.

The second matter concerns page, refer to page 222, PK404202, which relates to the JKR. Indeed, I constantly speak with the Exco about this, and he has helped me a great deal. However, there are work processes that take time. For example, in Rawang at B27, a contractor was appointed more than 3 years ago. Up to today, the work cannot be carried out because the contractor has run away. And when we contact the JKR, they too have their own problems, where the contractor cannot be appointed because an EOT has been granted, and so on. The roads are badly damaged, but we do not have, I, what I propose is

that if possible, we approve, or from this budget we have a special fund given to the Exco. Where, when the Exco sees that work must be completed quickly, we must obtain permission and approval to resurface the road immediately, rather than waiting for a contractor to be appointed under the SOP that has been set, and so on. I do understand the SOP (with permission) that exists at the district level and so on.

The third matter concerns Vote P12, Miscellaneous Programmes, page 219. Work related to street lights. Indeed, my fellow Honourable Members have raised the issue of street lights. And in my speech last week I already said that for maintenance work, repairing lights and so on, the best agency is Tenaga Nasional Berhad (TNB), because it has an SOP and it will solve light problems within 24 hours. But at the level of the PBT and JKR, I certainly do not want to say, I do not want to tell you, that they have no expertise, but they have to appoint contractors and so on. If we have an agency like TNB that can carry out repairs, they have all the expertise, their machinery and so on, why can we not use their expertise?

The fourth matter concerns Vote P01, page 200, PK 17, state special projects. In the state constituency of Sentosa, the number of voters is about 50,444, and in Taman Sentosa in particular we have about 20,000. In terms of housing, there are many housing estates, but we do not have a multipurpose hall. I request that the state government help build a multipurpose hall for use by the local community. And also in Taman Sentosa there is a police post that was built several years ago but is not being used. The building looks as though it has been burnt and is not in use. I ask that, if possible, we renovate or use this police post for the patrols that must go into the Taman Sentosa area. If possible, they could use the place for patrolling or to station a unit there. That concerns the police post.

Finally, entrepreneurs. Indeed, we see that many programmes have been launched and have been very successful. This year I do not see in the budget book anything about entrepreneurs, funds for Indian entrepreneurs, whereas last year, through the efforts of the state constituency, these funds were used to train B40 groups, because one income, that income, is not sufficient. We need to show them ways to do business so that the B40 groups can obtain a second and further income. So, that is all for my debate. I hope the state of Selangor continues to progress, and I hope government agencies and the PBT will be able to, and will provide the best services to the people. Thank you.

Deputy Speaker

Kuang.

Tuan Sallehudin Bin AmiruddinBERSATU · PHKuangEN

Thank you, the Honourable Member, Mr Speaker. First of all, I would like to thank you once again for giving me the opportunity to debate the Selangor 2019 state development budget. The first matter I would like to touch on concerns Kuang. Kuang, or in its newest slogan, is called Kuang Sejahtera. Because when I took, or won, Kuang earlier, two months after I won, I adopted an approach to launch a programme called stakeholder, stakeholder dialogue, towards Kuang Sejahtera. So we have gone through more than 19 stakeholder dialogues from across the whole of Kuang. And from the inputs we obtained, I have brought them into this House for the attention of all the Honourable Members, the Honourable Exco Members, and some of them may involve ministries at the federal level. First of all is my reference to the allocation that was given, or that was mentioned in the budget, concerning land acquisition. That allocation mentions only one sum. However, Kuang wishes to adopt an approach so that part of that allocation can be channelled to acquire part of the land at Lorong Melati in order to widen the existing road. At that junction, the JKR has already been carrying out repairs or enlargement of the road, but in the end it still does not achieve the capacity needed to ease the traffic, which is increasing more and more on Lorong Melati and also at that junction. Therefore, I request that the JKR Gombak in particular submit an application to acquire or buy part of that land for the widening of Lorong Melati in Kuang.

Mr Speaker,

I would also like to point out, for the information of all Honourable Members and the Honourable Exco Members, that Kuang does not have broadband. Traditional villages are still far behind, not merely left behind, but still do not have broadband capable of providing Wi-Fi services and so on. Where there is any, it is only enough for us to browse, but it cannot be shared together because the router or device supplied by TM is not sufficient for us to browse together even in a single building. Therefore I would like to request that broadband or fibre optic be installed, or be installed throughout Kuang, especially in the village areas. In Kuang there are more than 7 villages, and these villages really need this Wi-Fi, or Wi-Fi or Internet services, in those areas.

Regarding the upgrading of these village roads. As I mentioned in the previous debate, it concerns the existing village roads in Kuang. In the areas of Kuang, as we are aware, they were developed without following the facilities or planning permission in accordance with the existing regulations. Nevertheless, they were developed earlier than what exists now. So in the dialogue, I recommended that landowners submit planning permission facilities on their lots to separate those lots into individual titles, which will eventually become absolute ownership of the houses concerned.

Regarding Tasik Biru. This is a tourist area where a jet ski competition was once held at national level and some also at international level. And this jet ski, this (Tasik Biru), is a man-made lake, a man-made lake that is very deep. I have been informed that it is very deep. But I have not yet dived. If there is time tomorrow, and there is enough equipment, we would also like to invite Templer to dive together in Tasik Biru. We shall see who surfaces and who sinks. So I request that Tasik Biru be given attention by the Exco (YB Exco for Tourism), so that several facilities are provided and improved to attract more tourists to come to Kuang and especially to Tasik Biru.

In the dialogue I held in Kuang, we recommended that land held under shared titles be developed or improved by submitting a boundary subdivision plan. So when I say that, it may cause very high costs to the owners of that land. Perhaps, with prudence in development expenditure this time, I request a little exemption from the PBT or a little exemption from the District and Land Office to provide sufficient space to allow planning facilities under the existing conditions, without imposing the strict conditions that we normally apply in a development area.

The Bandar Tasik Puteri area is also part of Kuang. Bandar Tasik Puteri has been developed into a large town (fairly large), with a population capacity of more than 70,000 people so far, and there are still many areas to be developed in the end, and that is causing school congestion in Bandar Tasik Puteri. Bandar Tasik Puteri (for the information of YB Speaker and YB Exco) has only national schools, two national primary schools. There are two national schools and one

national secondary school. And these schools cannot accommodate the increase in population and also students in the years to come. Therefore, I request that Bandar Tasik Puteri be given priority for another school to be built or constructed. A secondary school to accommodate the increasing number of students.

And also in terms of security, Bandar Tasik Puteri also needs a police station, because the existing police post is not up to the standard of a police station, but is merely a place, or whatever this is, to provide service (to provide security services and so on) in Bandar Tasik Puteri. Therefore, I request that another police station be built to ensure that the safety of our residents in that area is guaranteed further.

Regarding the Smart Selangor Bus. I have been informed by the PBT, or the Selayang Municipal Council (MPS), that the Smart Selangor Bus has been approved and is now at the tender stage. I do not know when the tender will be called, but I hope the Smart Selangor Bus can begin its service at the latest this month or early January 2019. This is because Bandar Tasik Puteri needs the Smart Selangor Bus. Because I know how difficult it is for residents in the Bandar Tasik Puteri area to use buses to go to work early in the morning, and if the bus arrives late, they will also arrive late at work, and in the end half of their salary has to be deducted. And that is why, when I surveyed the Smart Selangor routes, I only then realised that to get this bus, they have to walk as far as 3 or 4 kilometres to reach a bus station, or a place where the bus stops. Because the bus does not circle throughout Bandar Tasik Puteri to pick up passengers, but only stays in one area (stays in one place), and that is where all passengers will begin to come to take the bus service that exists now.

Regarding the reconstruction of taught mentioned in the presentation by YAB the Menteri Besar. I was interested because this reconstruction of taught is a change to several matters involving administration. This administration must begin with (this reconstruction must begin with) administration. And I see that the Gombak District Office seems to have somewhat already moved ahead in reconstruction in terms of its administration, when I saw the Chief (District Officer) begin to organise their administration, the administration at the District Office, to ensure that services or the provision of services to the people can be delivered adequately. And I also see

how he has begun to dig through land application files that have been left for decades in the Land Office without any action taken. I have seen files that are 10 or 15 years old, from complaints I received, that have not been answered at all by the Land Office. So this time, I see that going forward the actions of the Gombak District and Land Officer show, and have begun to carry out, the reconstruction of taught as suggested by YAB the Menteri Besar.

I have a little more, Mr Speaker,

I would like to touch on Sabak Bernam. Because Sabak Bernam is part of where I come from. My origins before coming to Kuang are from Sabak Bernam. So I would like to touch briefly on Sabak Bernam, as a show of support for our friend from N02, namely Sabak, in the next process.

Deputy SpeakerEN

But Sabak hasn't spoken yet. How are you going to support him?

Tuan Sallehudin Bin AmiruddinBERSATU · PHKuangEN

That's fine. I'll be brief. Not long. I don't know whether he is going to say anything about this matter.

Deputy SpeakerEN

Ha ha ha. Alright.

Tuan Sallehudin Bin AmiruddinBERSATU · PHKuangEN

I do not quite agree when the YAB Menteri Besar names this Sabak, or from Kuala Selangor to Sabak Bernam, as the 'northern wing' (anjung utara), because the phrase that should really be used is 'northern gateway' (gerbang utara). This is because when we put 'wing' (anjung), it means we just sit at the wing (enjoying the breeze). But that does not meet the wishes of the people of Sabak Bernam in particular. Perhaps Mr Speaker is not here. If he were, he might support me, because he is part of Sabak Bernam. So we must see Sabak Bernam as either a wing or a gateway. Not a wing any more. A gateway. A northern gateway that will bring benefits and spillover to all of the people of Sabak Bernam.

I am aware that there has been out-migration from Sabak Bernam totalling 15,000 in 2013. And in the years that followed, this migration has certainly increased. I hope something can be done in Sabak Bernam, especially as I propose that the estate lands now under leases that may expire in a few years not be renewed. They should be taken back and disposed of, and the land returned to the state government, because perhaps from ownership of that land,

the state government, or the Land Office, or the Sabak Bernam District Council, can carry out development for Sabak Bernam in particular, because in Sabak Bernam 95% of the land is held under permanent ownership or existing ownership. I feel the government's land is not enough to develop Sabak Bernam. Apart from what has been done at Sungai Lang, because at Sungai Lang I heard earlier that they wanted to build a maritime port. But I hope that this maritime port can be built at Sungai Lang, because at the time when the Barisan Nasional government was about to fall in Perak earlier and across Malaysia, I saw there was hasty planning to develop Sungai Rungkub as another maritime port in Perak.

For the information of Mr Speaker (Honourable Member),

Rungkub and Sungai Lang are not far apart in location. And I believe that if we use all our own assets or finances (financial resources), we are able to develop another port, which I hope will be located at Sungai Lang.

Regarding the settlement of residents, or the bagan settlements along the coast from Sekinchan right up to Bagan Parit Baru. I hope a change will also take place. We do not want mere development; we want to see those bagan settlements developed with a fisheries industry that is more organised and more advanced, to process fisheries products to drive their own economy there. So those are the two matters.

One more thing I would like to add concerns the position, or price, of palm oil, which has plunged so sharply recently. Between (with) the offer prices that exist, which are determined by the world market, many small planters are quite evidently distressed. So for this partnership, I humbly request that PKPS build a palm oil refinery at Sungai Panjang or similar, or at another nearby location, so that these small planters can sell directly to the mill built later, and from there they will be able to obtain cost savings of RM10 per meter (per tonne), and ultimately, at one tonne or 8 tonnes a day, they will at least gain added value of RM80 from transportation cost savings.

So that is the end of it. And regarding agriculture. I propose to the Exco (YB Exco) that they gazette the entire length of the road or the entire length of the canal bank along the alignment of the Sungai Panjang Forest Reserve, to be given not ownership but permission to be developed for planting maize and

so on. Because along this canal bank (more than 40 kilometres), if it continues to be utilised, it will contribute to the animal feed maize industry for livestock. Thank you.

Tuan Shatiri Bin MansorPKR · PHKota Damansara

Saya, Tuan.

Deputy Speaker

Kota Damansara.

Tuan Shatiri Bin MansorPKR · PHKota DamansaraEN

Thank you, Deputy Speaker. Kota Damansara would like to thank you for, with your permission, allowing Kota Damansara to take part in this afternoon's debate on supply.

I would like to begin on the heading under P01-PK19 (various). I understand that under this PK it involves the Workers' Empowerment Institute. I thank the state government for being so concerned that at last we have an institute related to workers. As I have informed before, several acts must be followed in promoting this institute. Among them are the Employment Act, the Trade Unions Act and the Industrial Relations Act. Apart from that, there are also two ILO Conventions 87/98 and one document that is very, very important to promote, namely (with permission) code of conduct of industrial harmony. I say this repeatedly because this matter is very important, Deputy Speaker. Because generally today we see many workers do not know their rights. For example. Yes, an example. A person is dismissed from work, or fired, or mistreated, without that worker knowing that they have a right, namely under the Industrial Relations Act 1997, namely under Section 20: "a worker is entitled, for 60 days, to lodge a complaint with the government so that they are rein takes reinstated" under Section 20. Although this matter is simple and trivial, if this right is not used by the workers, then they no longer have any platform or means to be defended. And this is under the provisions of the Industrial Relations Act 1997. I very much hope that with the existence of this institute, that act can be promoted to all workers. Indeed we say that government employees are under the general orders. But many of our private-sector workers are bound by that act. So if these people are not introduced to that act, eventually they will be mistreated, their families will be mistreated, and so on. So Kota Damansara hopes that with the Workers' Empowerment Institute, this matter can be made known (promoted) to all workers, especially among private-sector workers.

Mr Deputy Speaker,

I also touched on the other day the issue of the glut of workers. The glut of workers is a national issue. We all know Selangor leads in various fields (such as industry, manufacturing and so on). However, Kota Damansara very much hopes that the state government will lead in efforts to champion workers' rights. We may say the RI4.0 TVET programme, we say skilled industry sectors. As I mentioned before, many of our foreign workers are not skilled workers at all. We are not saying, in the words of others, the category of dangerous, dirty and difficult (with permission). They work, as people say, at petrol stations, at the front counter, in restaurants, and these kinds of jobs should not be allowed in this state of Selangor. We need to reduce. We need to reduce foreign workers in the state of Selangor. We need to make efforts to ensure that they, especially in the state of Selangor, we lead other states in efforts to reduce foreign workers. So I hope that institute will give suggestions, although we know that the authority over this work (the authority over labour rights) lies under the Ministry of Human Resources. But I hope the Selangor state government leads other states in efforts to reduce foreign workers, alongside promoting the acts I mentioned earlier, the ILO Conventions and also the document code of conduct of industrial harmony (with permission). An allocation of RM1 million for these institutes. I hope a larger allocation is given beyond that RM1 million, add to the allocation, although we know we are a beginning, but the workers are very important because they are the backbone of building the nation's economy, especially in the state of Selangor. I hope that the allocation can be increased so that we can involve especially the leaders, or the union leaders, can be involved in that institution. These are the two matters that I hope the state government will take seriously in regard to that allocation.

The next matter, Deputy Speaker,

I go to vote P12-PK2. We have already talked about floods, and I have been informed. This is building the bridge and the footbridge. We have RM9 million allocated. I am also not very clear how this allocation will be used. However, I would like to stress once again that the flood problem at Kampung Melayu Subang involves building a bridge at Kampung Pekan Subang that connects Pekan Subang and also Subang Perdana. I hope that the existing allocation can be considered and priority given to that bridge so that a long-term solution to the flood problem of Kampung Melayu Subang can be achieved.

Next, I refer to P (under vote P12-PK3, namely building roads). Kampung Melayu Subang is an old village, its roads have been old for a long time and have not been changed or replaced, several roads that I have already mentioned, especially Jalan Bukit Badak, Jalan Jati, and there is also a road named Jalan PKNS (its name is PKNS), but they are not maintained (not repaired) or not upgraded. There is also one road (I am referring to that one, Jalan Bukit Badak). Jalan Bukit Badak was previously repaired and upgraded, but in the middle of that road there are still electricity poles. So I hope that with electricity poles in the middle of the road, it causes difficulties for vehicles to move smoothly and so on. I hope that under this allocation, Jalan Bukit Badak, especially in the Taman Subang Baru area, can be upgraded so that the electricity poles in the middle of the road can be changed and will give comfort to the residents of Kampung Melayu Subang and Taman Subang Baru.

Besides that, we know that the Kota Damansara area is a middle area that connects to the Kuala Lumpur area and also Paya Jaras. We know traffic congestion frequently occurs because these are shortcut roads for those travelling from (especially from) Paya Jaras, Kuala Selangor; they will pass through Kota Damansara and will go through one of the roads called Jalan Persiaran Cakerawala.

Deputy Speaker,

Persiaran Cakerawala's road is already two lanes. Traffic congestion frequently occurs, but the other side is indeed empty. That means we can widen the road further. God willing. Because if we widen it from two to four, that problem cannot be (can be) solved.

Deputy SpeakerEN

I think that is not from Paya Jaras to Kota Damansara. That is from Kota Damansara

Tuan Shatiri Bin MansorPKR · PHKota DamansaraEN

Paya Jaras to Kuala Lumpur.

Deputy SpeakerEN

That is from Kota Damansara to Paya Jaras.

Tuan Shatiri Bin MansorPKR · PHKota Damansara

Dua-dualah. Dua-dua.

Deputy Speaker

Hahahahaha

Tuan Shatiri Bin MansorPKR · PHKota DamansaraEN

Both. But Persiaran Cakerawala needs to be upgraded, and from two to four, yes.

I would like to touch again on P14-PK1. This land is indeed earmarked for building a religious primary school, namely at Persiaran Fajar. Previously there was already its sign board, it was even officiated, but until now nothing can be seen, nothing apart from overgrown bush. So the site at Persiaran Fajar is hoped, under PK1, to give priority to a religious primary school in Subang Bestari. Also under PK3. We all know that there is the allocation for the two mosques promised by the state government, namely in Kota Damansara (one in Subang Bestari, the other in Kota Damansara), I hope those mosques can be given priority.

Next, under P16-PK1 (development plan). I have mentioned before, namely upgrading the long-existing hall, namely the Dewan Kampung Melayu Subang Tambahan.

That concludes my debate.

Thank you. Assalamualaikum W.B.T.

Deputy Speaker

Kampung Tunku.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

One or two cats ran off. Thank you, Mr Speaker, for the opportunity to debate today.

Deputy SpeakerEN

That pantun just doesn't seem to fit somehow. Hahahahhaha.

Puan Lim Yi WeiDAP · PHKampung TunkuEN

I refer to page 197 (vote T01 under the Menteri Besar's Office and the project code is 01003 concerning the Smart Selangor Delivery Unit). I would like to ask the state government, what projects are planned under economic development that will be carried out by SSDU? I am here (Kampung Tunku) supporting the good efforts of SSDU, but I would also like to mention in my budget debate speech on that day. I feel the direction of Smart Selangor based on the Smart Selangor Blue Print published in 2016 needs to be re-examined from the economic aspect. For example, Smart Selangor Phase Dot Com, which allows the public to buy fresh goods online, does not seem to show value add (with permission) to the direction of Smart Selangor. So I hope the state government can reconsider and carry out development projects that are beneficial and also have KPIs that we can clearly show to the people.

Next, I refer to page 199 to PK13-13004 (Research on Malay Customs, Language, Arts, Culture and Heritage). That is why I recited a pantun earlier. I hope the state government, in this effort, will consider sharing the research findings with the state assemblymen (Adun) of the relevant constituencies. For example, YB Hulu Kelang is very concerned about this topic. And I would like to propose that this research work does not forget the Petaling Jaya area, where the DUN Kampung Tunku is also located. For example, in the DUN Kampung Tunku, Allahyarham Usman Awang once lived there, his children still own a house there which was visited by leaders such as Dato' Seri Anuar Ibrahim. In DUN Kg Tunku there is also Kg Baru Cina Sg Way which has a mosque that is about 60 years old, and also Kampung Tunku National School, which was officiated by none other than the father of our independence, Allahyarham Tengku Abdul Rahman, and also has a dance group named Pawana Tari, which performs joget, traditional Javanese dance, and took part in a competition in France and won a medal. So I think it is important for this research work to also take into account the urban area, and we can highlight living heritage (with permission). This will also create a synergy between research findings and tourism efforts so that we can show off the unique state of Selangor.

Thirdly, I would like to refer to page 202 PK-18 Project Code 18005 Concerning Civic Consciousness. Kg Tunku welcomes this effort, but Kg Tunku has a question regarding this citizen-care initiative, namely who will be the planner and operator of this civic consciousness initiative. Will it be done in-house (with permission) or out-house (with permission). What project will be carried out and what elements are in it, and will the State Government carry out joint efforts with the Ministry of Education Malaysia and the Minister of Education's announcement today on civic education (with permission). And the fourth and final point, I would like to refer to page 255 Vote P16 under the Department of Town and Country Planning. Its project code is PK 2 Policy Planning 02001 Environmentally Sensitive Areas. Kg Tunku is puzzled why there is no development allocation for policy planning concerning environmentally sensitive areas. I am of the view that the sustainability of our environment should not only look at forest gazettement; we need to consider it from the aspect of town and country planning. And looking at changing weather patterns, or global warming (with permission) today, perhaps we need to re-examine environmentally sensitive areas. Perhaps we need to add new ones, so I hope there may be an allocation for this purpose. That is all for my debate today. Thank you.

Deputy Speaker

Bukit Melawati

Puan Juwairiya Binti ZulkifliPKR · PHBukit MelawatiEN

Thank you, Mr Speaker, for the opportunity to debate the motion on the 2019 development allocation budget. I refer to page 198, Vote 4 P01, Project Code PK 7 Youth and Sports Generation and Sports 07002 Upgrading of Sports Infrastructure amounting to 3.24 million. I wish to raise an issue that the State Government should give due attention to in efforts to address the social problems caused by illegal racing and rempit activities, by developing motorsports especially in rural areas. We take note of the State Government's plan to build a racing circuit in the Sungai Tua area, but for the information of Honourable Members, the Kuala Selangor district has a motorsport circuit known as Litar Lumba Rakyat at the Kuala Selangor District Council complex since 2006. Litar Lumba Rakyat is a platform for Amateur Motorsport that has produced many young champions in bicycle racing and motorcycle racing, sorry. For example, Mohd Sariffudin Azman, 17 years old from Puchong, overall champion of the One Make Race Yamaha Petronas Malaysian Cup Prix 2016 and also overall champion of the KBS Petronas Malaysia Cup Prix 2018. Mohd Akid Aziz from Gombak, overall champion of the CP115 Petronas Malaysian Cup Prix 2016 and overall champion of the under bond 150cc Asean Road Racing 2017. Mohd Husama bin Nazam, 16 years old from Kapar, overall champion of the One Make Yamaha Petronas Malaysian Cup Prix 2017. Mohd Zaki Ahmad, 16 years old from Meru. Mohd Akiq Jumali, 27 years old from Kapar, and Mohd Aiman Tahiruddin, 18 years old. All of them and many other young people who have become podium champions in the motorsport arena were successfully produced from the Litar Lumba Rakyat Kuala Selangor. Apart from producing more young entrepreneurs in the motorsport field, therefore I humbly request that the State Government look at the development of motorsport more seriously, because this actually helps the State Government in developing the potential of young people and advancing the national motorsport industry, in addition to the aspect of preventing illegal racing on public roads. Therefore, it is indeed appropriate for the State Government to set aside part of the allocation to upgrade the facilities and infrastructure as well as the safety aspects at the Litar Lumba Rakyat Kuala Selangor so that it meets the standards set by the Automobile Association of Malaysia (AAM), for the sake of the continuity of the agenda to make motorsport accessible to the people and to develop the potential of young people.

Next, Mr Speaker, page 199, Project Code PK 14 Library 14004 Upgrading of Village Libraries with an allocation of RM 1 million. I hope the allocation can be channelled to upgrade the village library in Kampung Asam Jawa, in the DUN Bukit Melawati, which is very dilapidated and not cheerful, and the book collection is also very small and not varied, so it cannot attract children's interest in spending their free time reading and carrying out related activities and carrying out... because the library should be more conducive and comfortable and equipped with wifi facilities so that it can attract visitors, especially students, in cultivating the habit of reading within the community.

And next, I refer to page 232, Vote P13 Irrigation and Drainage Department, Project Code PK 1 Development of Flood Mitigation Projects 01403 Selangor River Basin, Kuala Selangor district. Mr Speaker, I welcome the allocation for the Flood Mitigation Project amounting to RM 3 million at Kampung Rantau Panjang in the Kuala Selangor District. For the information of Honourable Members, there are several villages near the Selangor River in the Kuala Selangor district that are often hit by floods due to overflow from the Selangor River, especially when heavy rain and high tides occur. Among the villages involved are Kampung Asahan, Kampung Tanjung Buah and Kampung Tanjung Siam. Indeed, at this moment too, Kampung Asahan Batu 8 is being hit by floods which have affected almost 20 residential houses, when prolonged heavy rain over several days recently occurred, and indeed every time during the monsoon season each year. Apart from the delay in the water pump upgrading project in Kampung Asahan, which was supposed to be completed in August 2018 but is now expected to be completed in March 2019. I understand that flooding in this area is said to be partly caused by the Selangor River estuary becoming increasingly shallow because a lot of silt has accumulated, causing the outflow of Selangor River water to the sea to slow down. So whether or not desilting work has been carried out in that area since long ago. Therefore I ask that a study be carried out to examine the Selangor River estuary, and that an allocation be provided for 2019 for desilting work at the Selangor River estuary as one of the flood prevention measures in the Kuala Selangor district. That is all for now, Mr Speaker, that is all. Thank you.

Deputy Speaker

Rawang

Tuan Chua Wei KiatPKR · PHRawangEN

Thank you to the Deputy Speaker. So I would like to touch on several matters. The first is referring to page 198, P01 Office of the Menteri Besar and State Secretary, PK 7 Youth and Sports Generation. The Project Code is 07002 Upgrading of Sports Infrastructure, which amounts to 3 million 2 hundred 4 ten thousand ringgit. So here I want to touch on this because previously there were many initiatives from the portfolio for villages, dams and also traditions, which we see are constantly upgrading sports infrastructure, held in villages, causing residents in their housing estates to lack infrastructure for sports, and here, I see that the item, the item is writing upgrading of sports infrastructure. I propose that besides upgrading sports infrastructure, we also need to develop new infrastructure for our young people. And second, the amount of 3 hundred 3 million 2 hundred 40 thousand, I think it needs to be increased for the areas in those housing estates so that young people get a better place for sports infrastructure. Secondly, I want to touch on page 202.

P01 PK 18 People's Care Initiative (IPR), Project Code 18004 Workforce Retraining Scheme. So in this sitting of the House we have heard a lot about IR 4.0, and here I see the workforce retraining scheme, although there is such an item there is no budget for it, and I see its importance because in Selangor we say Selangor is an advanced state and we need a lot of skilled workers for the industries of the future. The next is the project code of the same page, 18005 National Awareness. So I have taken note that among the 10 IPR programmes that we know, only National Awareness may be able to get an explanation from the Government about what programmes have been carried out for National Awareness. I think many ADUNs here have not been informed about this, or is this a new programme?

Next is regarding infrastructure, which many have mentioned over these past few days. Page 222, P12 Public Works Department (JKR), PK 4, Project Code 04202 Upgrading of B27 Jalan Rawang to Batang Berjuntai Phase 2. The budget mentions that a total of 1 million ringgit has been allocated, but for this project, as the ADUN for Sentosa mentioned earlier, this road has indeed become a major issue because in the Bandar Country Home area there are two EXCOs, two ADUNs and also one secretary to a Minister living in that area, so indeed many people and many important people use that road in that area. However, the project was started in 2013 and until now the project has not been completed, so I hope the Government will give attention so that the issue can be resolved, because I always receive the same complaints on Facebook and WhatsApp. And next, regarding B27, also Project Code 04204 Upgrading of B27 Jalan Rawang to Batang Berjuntai, but this one is Phase 3. I have discussed with JKR, so it appears that the need to upgrade Phase 3 is not urgent compared with the missing lane which is always flooded. So I hope the Government may consider or include the item called the missing link in B27, and regarding the B27 project, one of the reasons for this long delay is the lack of a utility map, where every time they dig a new hole, they find utilities. So I would like to get the Government's view on whether we have prepared a complete utility map so that in future, across all areas of Selangor, upgrading projects can be carried out smoothly.

Finally, what I want to touch on is regarding page 248, P.K 3 - Selangor Islamic Religious Department, P.14, the project code is 03204 Taman Pelangi Mosque. I see that this matter is indeed mentioned in the item, but no budget has been given, so I request an explanation from the Government. That is all from me. Thank you.

Deputy Speaker

Jeram. Silakan.

Tuan Mohd Shaid Bin RosliBERSATU · PHJeramEN

Thank you, Mr Deputy Speaker. There are three matters. The first is regarding P.K 3, namely Entrepreneurs. The other day I proposed to the Honourable EXCO a night market or a market for the youth, where we can create a business culture among the youth across Selangor. This means

Deputy SpeakerEN

With permission, yes, with permission.

Tuan Mohd Shaid Bin RosliBERSATU · PHJeramEN

because some young people came to meet me and said, Honourable Member, when I was in primary school until now, I have married, and the uncle who ran a business at the night market is still the same, so when we want to take over, he says... I said, this opportunity can be provided for the youth, with the presence of the EXCO for entrepreneurship, in shaa Allah I am sure we can have a space for the youth where those who trade are perhaps aged 30 and below. This means on the site, perhaps the night market site, but during night market hours, there should be no older people trading, only young people. Whether they trade, it must certainly be something halal only. Whether they sell online or sell food or whatever. As long as there is space for them to trade and this happens across Selangor (with permission). So indirectly we bring an entrepreneurial culture to them. I think finding traders is quite easy with the existing Hijrah Programme, we already have their data to provide space and opportunities for these young people, so that is my view, I hope for due consideration from the Honourable EXCO. Second, regarding P.K 15, or it can also be linked to P.K 17, special projects or Property Housing, regarding the construction of a surau. Previously, in the last sitting, I raised the matter of surau sites provided by developers, but the surau was not built. I also received a reply from the Honourable EXCO stating that the developers said we do not know who the buyers are. That is true too, we should not be too friendly with developers, we must also consider being friendly to the community. Where we can include a clause that if more than 50% of buyers are Malay Muslims, then we can require developers to provide a surau. Construction of a surau. If not, the State Government needs to add a special project, namely having to use State Government money to build a surau, because in my area many housing estates are actively developing. Developers only provide surau sites. Some people are even performing prayers in containers because they do not have complete facilities. So this is merely my suggestion for the State Government to consider and impose that condition so that developers can provide surau sites.

Third, regarding P.K 19 general. If you look, there are sub-items, which are more about land, taking over land and so on. For the information of the Deputy Speaker and the Honourable Member, there are many issues regarding lot land or State Government land in my area, there are three places with land disputes. Two originate from Ijok, Kg. Seri Aman, Kg. Seri Sentosa and Felda Bukit Cherakah. So we are well aware, as the Right Honourable Dato' Menteri Besar stated, the increase in our revenue through land. Therefore, due to this matter, I humbly ask for the kind cooperation of the State Government, the Land Office and also PTG to please seek the opinion of ADUNs, because there are three to five groups in one area who claim they are associations that have been chosen by the villages. So when we support one village residents' association, other associations say we are taking bribes, we have been bought and we have vested interests and so on. So the matter becomes slander, protests, raising banners and all sorts of things are happening in villages that have land. So I humbly ask for the kind cooperation of the State Government and also the District Office, as well as PTG, to please consider if there is a letter of support from the ADUN of the area, and likewise if the ADUN of the area states that they do not support it for certain reasons, please also keep it pending and not approve it, because if it is approved, what will become a problem is that the one who bears the burden will be the ADUN of the area. The State Government may approve it and get the results, but those who will face the consequences are the ADUN of the area. So I very earnestly request in this honourable House to please give space and opportunity to the ADUN of the area to support or not support in land issues in that area. That is all, thank you.

Deputy SpeakerEN

Alright, yes, Sabak.

Thank you, Deputy Speaker. I did not originally intend to debate the 2019 Development Budget, but when Kuang mentioned Sabak, I felt challenged, as if the Sabak State Assembly Member were asleep. (Laughter). I agree with Kuang's view that Anjung Utara should be renamed Gerbang Utara, but on condition that there is a gateway between Perak and Sabak Bernam, namely across the Sabak bridge, if the State Government can do that. If so, I agree that Anjung Utara be renamed Gerbang Utara. Honourable Deputy Speaker and Honourable Members. Sabak is a good child. They know their father is short of funds and is also striving to strengthen state administration. Sabak simply wants to point out that the palm oil, coconut and paddy industries have nearly collapsed in Sabak Bernam, so I

very much agree that this Anjung Utara, which is in the same cluster as Kuala Selangor, be developed as a tourist area. I want to mention P.13 Irrigation and Drainage behind Sabak Bernam town. The beautiful river there already has a jetty and already has Istana Raja Sehari, which is a Wedding Venue. There is already a tourism office of the Sabak State Assembly (DUN), already a Heritage House, and already an Agriculture and Fisheries Museum. There is also a rest house of His Royal Highness Tuanku Sultan. There is also a resort, but unfortunately, although there are so many facilities, no tourists come. During the visit of the Menteri Besar and EXCO to Sabak Bernam, I waited for the Tourism EXCO to come to the area. I waited and waited, but the Tourism EXCO did not come because there were more important matters (laughter). So I hope the Tourism EXCO can be reminded to visit the river area behind Sabak Bernam town, because its potential is very good for attracting tourists to Sabak Bernam. Subang Har Resort, which has been ruined due to weak management, I hope can be repaired quickly, because Har Resort is the focal point for tourists to stay in Sabak Bernam. Secondly, I am also saddened that the Honourable Dato' Menteri Besar, during his visit to Sabak Bernam, wanted to see the Rumah Selangorku Project in Air Manis, but unfortunately, once again, the Honourable Dato' Menteri Besar had more important matters and could not go to the area he wanted to visit. So I ask that the Rumah Selangorku Project in Air Manis that I mentioned earlier, whose groundbreaking was in 2008, land reclamation in 2013, and show house in 2018, and the people are saying that only after the fifteenth general election will this project be implemented, be carried out immediately. I think this perception (laughter) can be refuted and it will be implemented promptly. Thirdly, I want to mention livestock farming. In Sabak Bernam there are many cattle farmers, to the extent that when the EXCO visited Sabak Bernam Hospital, I was told there were reports of cattle often wandering around the hospital. I think so, ah, that's right, the Honourable EXCO is correct. So I ask that these cattle not be regarded as wild animals, because in Sabak Bernam these cattle are already regarded as wild animals because they disturb public peace, especially on the roads and also at government or private premises. So I hope that it can be made easier. They are not unwilling to farm on existing land, but it should be made easier for farmers to obtain land so they can raise cattle in better conditions. When asked, they built pens on Public Works Department (JKR) reserves. Eventually, three weeks ago, the Land Office demolished them. There was nearly bloodshed, there was nearly a fight, but it was eventually resolved. Alhamdulillah, thanks to the wisdom of the Sabak State Assembly Member, more or less like that (laughter). I say this, this is not an attempt, this really happened. (Laughter). So that's that.

Thirdly, I ask that what Kuang mentioned earlier, that there was indeed a proposal earlier together with the Honourable Member who is now the Speaker, to build a small port at Sungai Lang, as Kuang mentioned, and it was said that if this project could be implemented, the Sabak Bernam District Council would immediately be converted to the Sabak Bernam Municipal Council, which was promised about six or seven years ago. But because Sabak Bernam is an area that investors do not like, I feel that the Government EXCO line-up should make Sabak Bernam eventually be loved and liked by foreign investors. A woman who is less beautiful, if made up, will eventually become the object of young men's desire. Sabak Bernam, which basically investors do not like, always keeps coming to Seri Setia. But if it is publicised that Sabak Bernam is an area that is a gold mine for investors, in shaa Allah, and I will end with a song from me. I hope this song will have an effect on Dato' Menteri Besar. (Laughter).

Putih-putih Melati

Merah-merah Delima

Apa yang ku hajati

Pasti Dato' MB terima

Thank you. (Thumps the table).

Deputy SpeakerEN

Thank you. (Laughter). I nearly covered my ears just now. (Laughter). Templer to debate. Yes. I will give the last slot to the Honourable Member for Templer before the Government winds up.

Tuan Mohd Sany Bin HamizanAMANAH · PHTaman TemplerEN

Thank you, Deputy Speaker. We are giving three stars to Sabak. Firstly, it concerns the construction of a new mosque within the Taman Templer State Assembly area. We want to ask the Government that if there is a letter of application or a letter requesting budget allocation from the Taman Templer State Assembly, we sincerely hope the Government will consider approving two new mosque projects. The first is in Kampung Selayang Pandang, a new mosque to be built, and then, with permission, upgrading the Al Furqan surau to become a mosque. The second point concerns the younger generation and also sports. There are three playing fields or three football fields in Taman Templer that urgently need repair because these fields are uneven. These fields are not level. The surface of these fields, in my view, when we went down to visit all three fields, I can say these fields are not suitable for our young people to use for programmes or sports activities. The first field is the football field in Kampung Melayu, Rawang Batu 16. Then the second is at the Taman Bidara field, and the third is to upgrade the field at Kampung Selayang Indah, where, if possible, the spectator seating area, or as the kids call it,

the seating area. What do they call it? Ah, grandstand. If possible, the grandstand should be upgraded and a roof built, because right now there is no roof there at all. So we hope the State Government can look into these matters. Then thirdly, concerning the playground at Bandar Baru Selayang itself, which in my view and opinion also needs repair and upgrading by the State Government. Fourthly, a request from a rugby team, because two nights ago I officiated the opening of the office of this rugby team, Team Rainos King, which requested the State Government to provide a rugby field for them for training purposes. Then I want to extend my heartfelt thanks to the Bukit Lanjan State Assembly Member who raised matters concerning the Bukit Lagong Forest Reserve, where, as we all know, there will be a housing project. I am in line and in step with Bukit Lanjan, because we know that the Bukit Lagong Forest Reserve has several places that are recreation or tourist spots. We are worried that if development or housing projects are built there, they may cause environmental pollution, and I feel that the State Government should review the housing projects built or to be built in the Bukit Lagong Forest Reserve. And lastly, concerning culture or customs. I propose to the State Government that we increase discussions on customs and culture not only for the Malays, but for other races or communities in our country, for example the Chinese community, the Indian community, Sikhs and so on, because I see, for example, when we visit those who have passed away who are not of the same race or religion as us. Sometimes we overlook matters concerning customs or culture. There are things that at times we cannot do when we visit, or things that go against the customs, culture or taboos of a particular community. So I hope the State Government can increase discussions so that we can better understand the taboos, customs and culture of other races in our country. So that is all from Taman Templer. Thank you.

SpeakerEN

Honourable Members. As the business of this House is still lengthy, the House must be continued today. I invite the Honourable Dato' Menteri Besar to move the Motion.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Speaker. Mr Speaker and all Honourable Members, I wish to move the Motion which reads as follows: "That the House sitting today, under Standing Order 11 of the Standing Orders of the Selangor State Legislative Assembly, shall be extended until 6.00 p.m."

Dato’ Teng Chang KhimDAP · PHBandar Baru KlangEN

Mr Speaker, I second the motion.

SpeakerEN

Honourable Members. This Motion has been seconded. I put it for agreement. Honourable Members who agree, please say YES.

Honourable MembersEN

Yes. Honourable Members who do not agree, please say NO. This Motion is agreed to.

SpeakerEN

The Honourable Government side of Sungai Tua is invited to give the response and winding-up.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Speaker, and Honourable Members who have debated throughout the session of the House, especially on the Development Motion involving P.K-P.K or the development codes that are subject to the State Budget Book 2019. I certainly record my appreciation because I have seen a very strong and vigorous involvement, especially among Members of the House, in putting forward views and also incorporating several matters that are felt necessary to ensure that development in our state is not only development that records profit and significant growth, but at the same time also involves the welfare and fate of the people, especially those who need assistance, and to ensure that all aspects of development in our state are sustainable, with permission, or development that is lestari. Beloved Members of the House. I begin by recording a quotation from Almatersian in his book "Development as freedom, the freedom to enter market's can it self a be significant contribution to development". Its meaning is that the freedom for the people to enter the market is itself a significant contribution to the development agenda. Beloved Honourable Members. Therefore, with that code, I move on to the first policy, namely concerning the alignment of IPR or the People's Caring Initiative, which has also attracted the attention of many Members of the House throughout the debate in the House. Words outside the House, or more specifically, in the Development Motion that we are discussing.

Beloved Members of the House. I would like to mention that in this alignment, some strategies that we have set are certainly to ensure that this policy shift is from giving, or gift, to empowerment, with permission. That is the first. Secondly, we certainly want to ensure that every programme held, organised by the State Government and implemented by the State Government, is lestari and sustainable, with permission, and is not a burden to the administration of the future. As Menteri Besar of Selangor, I am very responsible for the position and health, the financial position of the State Government administration, so that it is more sustainable and able to bear it. There is no point if we are extravagant now but in the future we have to bear a burden and a large administrative and financial problem, which will eventually thwart other development aspirations. And thirdly, certainly in line with the spirit of 9 May 2018, this alignment will certainly try to integrate what Gombak Setia has described as joint efforts between the State Government and the Federal Government, so that there is no overlapping, with permission, or redundancy, with permission, in the policies being carried out, and eventually we can give focus to the parties involved and to the parties concerned. In line with the third winding-up of the previous Budget Policy, I mentioned that every segment in our state, if we can separate between T20, or those who are already established and can be said to be rich. The middle groups, M40 and B40, always receive attention from the State Government, only that the focus is slightly different, and that process is what we call alignment, so that it does not only give something considered less valuable to certain groups. I give an example: for the B40 group, what is needed is financial injection assistance, to ensure they reduce the burden of the cost of living, reduce their monthly and daily overhead burdens every month, and this is implemented by the State Government in this alignment. For M40, our function and duty is to enhance their capability by adding skills and expertise. Increasing capital assistance under Hijrah, for example, or education programmes so that they can improve the quality of services, skills and capabilities that they have. And for T20, certainly through the Honourable Member for Industry and Investment, we organise business and commercial communication networks at SIBS, for example, or the Selangor International Expo, and next year we have the R & D Expo. All these are to integrate and further strengthen the strengths of every existing segment. It is not fair to us, in my view, the concept of justice, yes, if I may, the ustaz can explain the concept of justice, which is placing something in its proper place. There is no meaning if we give an injection to the M40 group when what the M40 needs is empowerment.

Honourable Members. I would like to mention that so far, the changes and formulation of MES or IPR from 42 are only some policies that we have implemented. First, of course, free water, because this free water we focus on the B40 group, and I explain that if we follow the definition of B40 in the State of Selangor, it can reach those with incomes below RM6,000.00. But we will not take the full RM6,000.00 and below because we do not have that database. The database is in E-Kasih, and then we will align it in several matters so that certain parties can be helped and costs reduced. And I forgot to mention why we set 25 cubic metres. The other day, Sungai Panjang was not Sungai Panjang. Sungai Air Tawar mentioned that 25 cubic metres is meaningless. It has meaning, because from the data we obtained, the average water consumption rate in the State of Selangor is at the rate of 25 to 26 cubic metres per household in the State of Selangor. That means at this rate, it can be said that almost all B40 groups who receive free water will pay zero ringgit for each use of water every month. That is the meaning we have made.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Honourable Menteri Besar, may I request an explanation: if we do not use the actual definition of B40, what cut-off figure will we use to determine which households get free water?

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. This is still not finalised. I admit that, and that is why I said the implementation may not be possible in January. I believe it will be done in March or April at the earliest, because we want to prepare an income cut-off. However, we can also look at the area, low-cost houses, we can also look at village areas, as an example and so on.

All of that we will go through in discussions. I believe in the March sitting I can table what is said about the alignment of free water that we want to implement, because we can reduce costs by up to 100 million ringgit Malaysia. I want to repeat once again that this has absolutely nothing to do with the takeover of SPLASH. The State Government has not used a single sen of allocation to take over SPLASH; instead, it is managed through the restructuring of Air Selangor Sdn. Bhd. itself.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

If we have not yet finalised the process, I can suggest that we tie it in with an existing assistance programme, so that people do not have to go to the SYABAS (Syarikat Bekalan Air Selangor) office or any other office to register, because that would cause great inconvenience to many people. We are targeting hundreds of thousands of families who need to register. Perhaps the cost-of-living assistance, where household income is below RM4,000.00, could be linked so that whoever qualifies for the cost-of-living assistance would automatically qualify for this free water.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you, Bukit Gasing, for that suggestion. We can inform you and I take note of the suggestion. Second, the system or programme that we are aligning and rethinking is the Selangor Heritage Children's Fund (TAWAS). The reason this programme needs to be aligned is that there is not yet a significant system in its investment structure. In yesterday's meeting with Yayasan Anak Selangor, we saw that there needs to be a specific programme to ensure that the State Government does not have to bear the burden every year of paying and committing to the agreement that we placed in the Tabung Anak Warisan Selangor. Since last year we have begun saving 12.5 million, this year we are saving 25 million, and over the next 10 years we must save 25 million. The cost for 10 years, from 2008 to 2018, that we have registered, and the State Government must bear, is around 330,000.00 registered citizens, and its value is RM400 million. So the State Government is trying to look at a more comprehensive and consistent system to address this issue, and that is why, in the budget speech, I mentioned that we need to discuss with PNB (Permodalan Nasional Berhad) so that there is a more significant and clearer investment element, so that in the end it is not so burdensome on the State Government, because at present, under the TAWAS programme, the total fund of 1,500 that was promised comes from the State Government. At the same time, we have the IPT award. Perhaps we can expand the IPT award, if we mention only IPT for now, to later also recognise Tibet, for example. And we can extend the IPT award to a Tibet award and an education tutor "education" award for children in the future. So the government does not need to bear too large a cost up to a certain amount, and the costs involved and so on. That is the second point.

TAWAS, and the third is the KISS programme. We are not cutting KISS but adding value. What adds value is that we are adding entrepreneurship training and a culture of "life skills" for KISS participants, and we are empowering the PWB (Empowered Women's Centre) in every state constituency (DUN), so that the Empowered Women's Centre takes into account every KISS participant to be educated and trained as a main "priority" to bring them out of the grip of poverty. This is the value I mentioned: they will not receive assistance until the end of their lives; rather, they can exit within a period of 5, 7 or 10 years targeted by the State Government. And next, the marriage incentive that changed. I will not repeat it; there will be much more discussion when marriage incentives are mentioned. And finally, the workforce reskilling scheme. This scheme was created to address the economic downturn and the retrenchment of workers in 2010 and 2011, and so on, during the first term, and the State Government already has an professional programme (IKHTISAS). Within IKHTISAS, we provide space, including for less skilled workers, to upgrade their skills, and we have other funds from the Federal Government, for example the Human Resources Development Fund (HRDF), of which a great deal is unused. Perhaps improvement programmes can be implemented to enhance the skills and capabilities of young people and young workers, and this is also in line with what Kota Damansara mentioned earlier. So overall, this is the spirit we have, and only these five items have changed. So there is no change to the policies that will be altered and so on, because from time to time we will try to examine each programme one by one so that it does not become a burden. Some of these programmes are now placed under their respective STANCO, because I want every STANCO and EXCO appointed by the State Government to be responsible for their own "portfolio". For example, we have placed HIJRAH under the EXCO for Entrepreneurship. Free tuition education programmes and free online tuition are placed under the EXCO for Education. The EXCO for Family, for example, will take responsibility for the marriage incentive and various others, including health and so on, which are placed in the PK under the relevant EXCOs. So the ten that were registered, which Gombak Setia mentioned, are programmes that have no owner anymore and have been placed under PK 18, so that after this we can realign them again. Honourable Members, for example, the SMUE (Golden Age Friendly Scheme) programme we are still continuing, but it is hidden within the miscellaneous vote, which has a budget of 19 million, and of the 19 million, 10 million, as in previous years, we have consistently allocated to the Golden Age Friendly Scheme. Dear Honourable Members, I think that after explaining to some extent the alignment of this IPR programme, which I believe has not received a very good response and there are various views, I repeat that this is to harmonise it, that is for coordination, to ensure our financial position is stable and able to endure for 10, 20, 30 years to come. At the same time, we will also ensure that every benefit given reaches exactly those whom we intend and truly empowers and enables the people and society in our country. I now turn to the specific issues raised.

Speaker

Sijangkang.

Congratulations to the government for the initiative to realign the IPR programmes and also to strengthen the benefits of the Peduli Rakyat incentive. I expected there to be something in this plan, because among them I see the Golden Age Friendly Scheme, which I touched on slightly, because this is one of the matters discussed at the level of, and raised by, the senior citizens in particular. When they receive this incentive, when they are no longer on this earth, when they have passed away, and also we have considered how one effort to give benefit to their lifetime, and the reason I see, and this is among the matters that may provide benefit to the golden age while they are still alive, I think, is among the incentives from the State Government to run programmes for elderly homes or senior citizen centres. I think perhaps the best use of the 2,500 allocation available today, which we feel will benefit funeral management. But in reality they receive it late, perhaps a month or two months, some more than that, before the benefit of this golden age reaches their heirs. I am thinking, perhaps there could be an alignment or strengthening of the benefits of this IPR in the form of, perhaps, courses or institutes for religious understanding in various religions, as Muslims, perhaps there are mosque-level programmes for those who have reached this age to prepare for death, for example, or programmes providing health benefits to senior citizens for the purchase of certain equipment, and as one of the alignments that the State Government may consider. I propose that there be programmes like these that are of greater benefit within this Golden Age Friendly Scheme. Thank you.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. I can inform the Committee secretariat to take this view into account. Indeed, we are ready for the senior citizens, who are quite numerous, because "life span", with permission, I have mentioned repeatedly, in the State of Selangor has increased from 65 to 75 years, and we are indeed prepared and have started with the obligation to provide a senior citizen centre as part of the development that is taking place. We have received certain working papers from the parties concerned to create a special programme for senior citizen centres.

However, we are re-evaluating the cost because we are worried that it will increase, and if we can expand part of the SMUE programme, I think it can be estimated and considered, but we want to see the cost so that it is not beyond what we can sustain.

Tuan Muhammad Hilman Bin IdhamBERSATU · PNGombak SetiaEN

Thank you to the Honourable Menteri Besar for the explanation just now. I think we take positively the State Government's intention to realign the IPR programme, but as the Honourable mentioned just now, this realignment has not yet been formulated in its final form, and I request that, if possible, the views of the state assemblymen (ADUN) be involved, so that we too may give our views. Secondly, I think that in the effort to realign, if possible, I would like to propose to the State Government that they also integrate the implementation of the IPR system. For example, if today there are two IPR systems, namely the KISS programme and Peduli Sihat, each uses different cards. So if possible, after this, perhaps if there are more State Government programmes, we could hold one more "integrated" programme, or integration, with permission, so that eventually we have something like a "citizen card", whatever benefits come from the State Government could be used through that card. This would also help simplify our coordination of IPR programmes, especially in every area. Thank you.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

We will certainly take the views of all parties in line with the concept of Maju Bersama that I mentioned earlier. We will accept the views of all parties, part of the speeches and views in this House as well. We will take into account the updating and finalising of the programmes referred to as the IPR realignment. Honourable Members, I will continue on the issue of Orang Asli development from Dengkil and Bukit Lanjan. Honourable Members, the allocation for Orang Asli development involves the development of Orang Asli infrastructure and the promotion of Orang Asli products. The allocation provided will focus on urgent infrastructure development work, while other needs will be coordinated together with the Department of Orang Asli Development (JAKOA) of Selangor from time to time. This is part of the coordination or adjustment that we are making again, involving the EXCO and the STANCOs and the portfolios that have links with the Federal Government, about which we were not previously informed.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Mr Speaker, I ask for an explanation from the Honourable.

Speaker

Silakan.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Just now the Honourable has informed this House that we will coordinate with the Department of Orang Asli Development (JAKOA). However, I want to know who determines the "priority" at the JAKOA Selangor level. For example, Honourable Members in this august House can propose what needs to be upgraded and so on, because previously we were informed that projects carried out in those villages by the Federal Government were not the projects requested, for example. Roads with large potholes that cannot be used, and so on, have been requested for years, but no one has repaired them until they informed the State Government.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Certainly, in the current new Malaysia, not only has communication between the State Government and the Federal Government improved, the feudal relationship has also improved, I believe, and the relationship with the people will be better with our openness, certainly with the concept of musyawarah (consultation) that exists between departments. We are now a government that is united at the federal and state levels. I believe the Honourable Member for Kajang will succeed in coordinating with the relevant EXCO at the federal level to ensure every project is a project requested and needed in Orang Asli areas or in village areas, in the designated Orang Asli customary territories. Honourable Members, Gombak Setia raised earlier the matter of the enlightenment project or enlightenment programme. The State Government has implemented the enlightenment programme since 2016 until now. In the 2019 budget speech, this enlightenment programme continues with an allocation of 1 million from the State Government, and we welcome the proposal of the Honourable Member for Gombak Setia to focus publications related to the Industrial Revolution 4.0 in 2019. Meanwhile, Bukit Lanjan raised just now the matter of Taman Rakyat. Honourable Members, at this time we are carrying out preliminary work, or "soil investigation", design preparation and construction work expected to begin in 2019. There are two sites we are considering, and we will present these sites and table them to obtain approval from the State Government or the state authority. Honourable Members, I now turn to the sports field raised by Dengkil regarding the red-yellow academy and the great achievement of the "red giant". Honourable Members,

I have mentioned this repeatedly and I want to mention it once more: this academy, in terms of its structure, has been established in every district, and we have an integrated training centre in Puncak Alam. The original purpose of launching this programme, which we started a year ago, is that we have succeeded in gathering 800 players aged between 8 and 17 years. Starting this year, we will align the modules. Currently, the modules have not yet been aligned; we will align the modules, and we will connect them with the existing teams in the State of Selangor, namely the PKNS team at this time, Selangor FAS and also Selangor United. Once these groups of teams have merged, there will be no problem, because at the same time FAM (Football Association of Malaysia) has given an assurance to allow us to send teams under 21, 19 and 17 for more than one team, and we have space to train and observe the performance and benchmarks produced by the Akademi Merah Kuning. In the future we are building an application, a smart application, to record the database of these players, and God willing, we will not only make these players play for the State of Selangor, but these players will also be sold to other teams at a value based on their ability and the record data we have. At this time we do not have that record; there are only two or three players who are already established, and many players have been lost at this time. This is indeed a long-term task that is not popular, but nevertheless I believe we must start from the grassroots to ensure our success and capability. Regarding.

Speaker

Taman Templer.

Tuan Mohd Sany Bin HamizanAMANAH · PHTaman TemplerEN

Thank you, Mr Speaker. Thank you, the Honourable Menteri Besar. For the past couple of days we have been shocked by an issue that a former national football player allegedly slept on the five-foot way to get treatment at a

SpeakerEN

This is not related to the development motion debated earlier.

Tuan Mohd Sany Bin HamizanAMANAH · PHTaman TemplerEN

Just a short question. I want to ask the Honourable Menteri Besar. Earlier, it was about development for the young generation who are interested in football. I only want to know what it means in terms of the welfare aspect of these former football players. Thank you.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Thank you. The player in question is a Penang-born player, a former national striker named Salahuddin Che Ros, and one of the important turning points in his life was after he returned from Pahang and played again in the state of Penang in the mid-1990s. In the mid-1990s he was among those considered to be involved at that time by the Anti-Corruption Agency (Badan Pencegah Rasuah, BPR) in a case of selling matches, and for that reason he was among those who changed the course of their lives as players, although at that time he had already begun to be paid around RM12,000.00 for that player. For that purpose, the state government actually set up the Merah Kuning Academy, also to train coaches from among former players. We have nine centres, and at these nine centres we have at least five or six, and almost all of them are from among former players who already hold an initial or C licence. We hope that after this we can upgrade and improve their licensing to level B or A so that they can train these players well. So with this Merah Kuning Academy we can actually help them, especially former players, to get involved in coaching or other fields. Football management, football commentators, football administration and so on. That is my brief reply regarding football. Next, I would also like to respond to the E-Games raised by Dengkil once again, and as I mentioned earlier, E-Games here is new and we are among the pioneers or first movers among the states involved in E-Sports or E-Games. We started in 2014 and now we have been able to attract more than 2,000 participations, 100,000 live telecasts on the internet, and nearly 700,000 when broadcast on E-GG. I think we have reached a certain level, and a few days ago I was involved in officiating the Selangor E-Sports Association, and I hope this E-Sports Association will succeed in administering, managing, and issuing the rules, regulations and ethics of E-Games, which can still be said to not have rules and regulations, with izin or standard ethics or norms like other sports. I believe that with the establishment of this association, the matter of a blueprint for our long-term plan can be seen, and this new matter, I also believe, we must look at its development and sustainability, and we must not rush in. I am afraid it becomes a seasonal trend that may fail, and the investment we make may not bring results, even though it is so fancy, with izin, or so attractive at this time for young people and the whole community to take part in. Honourable Members, I next refer to the views of Kuala Kubu Baru regarding PEBT, as well as the quota for PEBT selection, the method and guidelines for implementing the role of PEBT, and the PEBT management system. Honourable Members, we began establishing PEBT in 2009. We had 6 pillars, and in 2014 we established 10 pillars, and we already have a policy book, and then we established the regulations for the operation of PEBT since 2010 or even earlier than that. From time to time, the state government is improving its management and administration, to ensure accountability and that the finances disbursed can be assessed and finalised properly and tested with good accounts. So for the state government's part, previously we made accounts mandatory for every PEBT, but it was difficult to manage. Now we have placed accounts at the PEBT level and also on the state government's side, and I believe the accounts will be audited by the parties concerned, internally and externally, and we will be able to get actual expenditure and good expenditure. Regarding selection, since last year there was a proposal for us to interview, and this year's implementation we have added, apart from proposals from the secretariat, proposals from the ADUN, proposals from the Local Authority (PBT), we interview these candidates, because we want to see the commitment, capability and ability of that person to become a grassroots local leader, at an expenditure cost of around RM1.44 million every year to finance part of the allowances. And I admit that since I first heard that Sijangkang established PEBT, we did have a problem, 20 to 30 percent among those who were not active. Those who were appointed were not active, and we are trying to reduce this from time to time. Yet there has been an increase. I can say that before we set certain policies and certain training, in 2009, 2010, 2011, almost 80% of the programmes were sports. But now, if we look at the graph, it is fairly balanced between one another, and it proves the existence of good participation and attempts by the PEBT, which is managed and administered at the PBT level, to stabilise and arrange a more balanced programme across the pillars that we have set earlier.

SpeakerEN

Please, Kuala Kubu Baru.

Puan Lee Kee HiongDAP · PHKuala Kubu BaharuEN

Yes, Honourable Menteri Besar, I want to give this explanation. This is a matter raised by the Honourable Member for Balakong, but regarding that explanation I have only one request, which is that I hope the Honourable Member will maintain the 24 persons in the MDHS area, and let me settle it with the Chairman of MDHS.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Honourable Member, thank you. I cannot give approval just like that. I must refer to my officers there. Certainly our basis is the same as the format for village heads, the same as the format for appointing councillors, and PEBT has the same format. If there are changes there must be some small changes, but never mind, we will discuss it personally between today and we can talk aside after this, PM. So, Honourable Members, I will continue with the matters arising from the Standing Committee on Islamic Affairs Development, which mentioned, for example, Bukit Lanjan, mentioning the religious primary school Damansara Damai. Under the RMK-10, the construction of SRA Damansara Damai was planned to be built in 2015. However, after a re-evaluation of the overall planning of JAIS schools, covering several matters including land issues and allocation, it was proposed to be brought to RMK-12 instead. It could not be implemented in RMK-10 and RMK-11, we will bring it to RMK-12. Referring to feedback from Ijok regarding the need to provide a religious secondary school in Kuala Selangor, the state government's priority in religious education is primary school education, so that as far as possible school children have a strong foundation of faith, are trained in the obligation to worship, and are instilled with Islamic morals. That is why the state government has made every effort to open religious primary schools throughout the state where there is a Muslim community, which so far totals 227 schools. The need at secondary level is as a complement or a principle; all 23 religious secondary schools opened by JAIS have been handed over to the Ministry of Education Malaysia. Of that number, two are located in the district of Kuala Selangor, namely Sekolah Menengah Agama Jeram and Sekolah Menengah Agama Seri Desa, Tanjung Karang. Instead, the state government gives a new focus in religious secondary education, namely building the Maahad Tahfiz Integrasi Selangor (MITS). At present, four MITS have begun operating and one more is under construction. The state government has introduced secondary KAFA, with the latest total of 27 units, of which 12 operate in mosques while the rest are in SRA. I refer to the issue raised by Pelabuhan Klang regarding the allocation for mosques. Insyaallah, the state government is ready to consider upgrading existing mosques, but we will look at the density and the real issues, and please refer and inform the state government about the applications in the areas that were raised by Pelabuhan Klang just now. Honourable Members, I also want to refer to the views on national initiatives. This programme is a new programme that began in 2017 and 2018 and continued in 2019. Basically, this is the programme I mentioned about volunteerism. In this programme we want to attract the participation of Selangor's people to join volunteerism programmes so that we can nurture a spirit of togetherness among the community and people in our state. Certainly this programme is monitored by the State Economic Planning Unit (UPEN), and we want to ensure that the programmes implemented will take into account all groups and all levels of leadership, starting from State Assemblymen, Members of Parliament, local leaders such as councillors, village heads, and also leaders such as PWB and PBT, so that they do not create yet another organisational programme, but only nurture and encourage the participation and aspirations of the people so as to instil love for the state and nation. Understanding the policies and constitutional basis that exist in the country, and at the same time understanding their participation in the democratic process in our country, and being able to get involved

together to develop our nation and our state. My aspiration is that I want to see, in this state of Selangor, the involvement of the people, like the people in several cities such as Bandung and Surabaya, where the people themselves are involved in developing, and also involved in looking after and maintaining public facilities. And no longer outsourced and entrusted only to the state government. And this involvement and enthusiasm, I believe, is not a programme that forces, but rather teaches with a fairly relaxed and fairly good programme for the future. So, Honourable Members, I think I have explained many matters regarding the issues raised about sports activities and so on. I will refer back to them because they involve quite high costs, especially things like the field, whose cost is stated to be at least RM150,000.00. So far our allocation is RM40,000.00, and we will look later, if there is a contribution from the state government's subsidiary companies, and from there we will try to channel it to IPR programmes or state development, and that is what I mentioned as the new allocation and fund for the state government. Finally, before I close

Speaker

Kota Damansara.

Tuan Shatiri Bin MansorPKR · PHKota DamansaraEN

Mr Speaker, earlier I mentioned the religious primary school at Subang Bestari, Persiaran Fajar. I seek an explanation.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Regarding the school referred to by Kota Damansara, the state government is looking again at the readiness or importance of building that area based on the needs, and I think the details regarding the construction of these schools need to be discussed again. As I said earlier, the focus and emphasis of the state government is none other than to ensure that the development of primary school educational institutions can be achieved well. And lastly, regarding Kuang and also Sabak Bernam, they have not been forgotten. Insyaallah, I accept those proposals. That is why we formed these clusters. Where these clusters and groupings are concerned, it is none other than to look at the existing potential. It is not necessarily the case that if we have not visited, then we do not have it. The District Officer, councillors and UPEN are obtaining all the existing data, and regarding the affordable housing in Air Manis, we are re-evaluating it. Because the price offered is quite high. Quite high. And I think it cannot be afforded by people or residents in the Sabak Bernam area at this time. So there is no point in building it if it is not bought. So the State Government is indeed thinking about how we can reformat or re-manage it, even though we held the groundbreaking ceremony.

Speaker

Silakan, Sijangkang.

I want to draw attention to education that the State Government may consider regarding education for the Orang Asli.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Insyaallah, I believe today we will include it later. I ask the relevant EXCO, Kajang, to look into education for the Orang Asli. Including also efforts in dakwah involving the development and advancement of Islam in that area. Honourable Members, to conclude, I will follow Sabak's lead and also want to sing. (LAUGHTER)

SpeakerEN

Please sing, please.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai Tua

Nantilah.

SpeakerEN

Please, please sing.

Tuan Amirudin Bin ShariPKR · PHMenteri Besar · Sungai TuaEN

Another time, Honourable Member. I have no time now, but I ask that, if possible, all parties unite and not be easily tempted or enchanted by views that appear to improve but that, by inflaming us, ultimately bring us down. As an example, there are issues of racism and narrow issues.

Do not be tempted by the stars in the clouds, If they appear in the daytime, The tame dove that feeds from your hand Is rarely confined in the cage of the heart.

This is according to Ahmad Jais in his song. So whatever is embedded in the heart, keep it well, keep it well, express it well. Insyaallah, the State Government is committed to defending the basics of the Constitution, including fully supporting the policy of the Federal Government at this time, to postpone and reject the ratification of ICERD, to ensure the fate of all races in our country can be looked after. And to respond to the proposal from Gombak Setia, the State Government, actually, I did not have time to inform you, is continuing our policies, namely removing the requirement to pay door taxes for low-cost houses and village houses, including the licence fees that we have implemented. (APPLAUSE). Previously this cost RM60 million. Thank you. I beg your leave, because I have a programme where I must meet Duli Yang Maha Mulia Tuanku. That is all. Wassalamualaikum warahmatullahi wabarakatuh.

SpeakerEN

Thank you, Sungai Tua. We now, Batu Tiga, please.

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Thank you, Mr Speaker. Several Honourable Members have raised views and issues. But this one concerns feedback that is rather general, or a simple view: Pelabuhan Klang raised the issue of heritage villages and several activities that have already been carried out, as well as the special action plan for PTK villages. Honourable Seri Setia raised the issue of developing Kampung Hamid Tuah, and Honourable Jeram requested a new effort for the youth group. I thank all three Honourable Members who asked, but these are views, and we will take note of these matters, and InsyaAllah I will give them attention. But at the same time, I will also answer the questions or feedback that the Honourable Members require relating to my committee. I will go through the matters raised one by one.

Firstly, I respond to the issue raised by the Honourable Morib, namely the Bazar Darul Ehsan issue, which is currently seen as one where proper action has not yet been taken. So, let me answer this matter, namely its history. It began as far back as 2011. Two terms have passed, and since I took over, I found that Bazar Darul Ehsan still is not operating well. So actually, for the Honourable Member's information, the original purpose of developing Bazar Darul Ehsan was to become a hub for gathering entrepreneurs' products. But this issue, or so it appears, still has not been able to operate, so the building remains derelict and cannot be managed. So the failure factors that have been identified, when I took on the responsibility and I had already held several meetings, yes, the first on 03.10.2018, namely the coordination meeting on Bazar Darul Ehsan, and subsequently a follow-up was made after a visit. And, an earlier meeting by the Deputy State Secretary of the Development Division on 10.10.2018, and an assessment visit by the Public Works Department (JKR) thereafter. And finally we found that the actual failure factor of Bazar Darul Ehsan is the location, which we feel is rather unsuitable there. Given the products, if people go to Kuala Langat, the products they want are very easy to obtain. They go straight to the factories that offer prices far lower than those placed at Bazar Darul Ehsan. So for that reason we find that one location, and the products placed there, sometimes cannot be sustained or made lasting.

Thirdly, it is unclear who is actually responsible for maintaining the building. And we also look at the function and the need for a rebranding of Bazar Darul Ehsan. On that basis, I would like to inform the Honourable Morib that after the coordination meeting was held, there were two major actions. After it was found that there were issues of construction, issues of repair, issues of management, and also no ownership and no monitoring. So the meeting decided on two important aspects in the management of Bazar Darul Ehsan, namely firstly the issue of maintenance and repair of Bazar Darul Ehsan. That is, by ensuring that the maintenance process of Bazar Darul Ehsan must be carried out in cooperation with and monitored by the Kuala Langat District Office. Next, we are, and have already directed the Public Works Department, to take note that the assessment process must be carried out. And it must be done before 13 December, InsyaAllah. And a full report and a complete cost of damage will be submitted this month. After that, InsyaAllah for the information of the Honourable Member, under object code PK19 and object code 19002, RM500,000.00 has already been allocated next year to ensure that Bazar Darul Ehsan can be implemented. In terms of management, we find that once it has been repaired, what will happen to Bazar Darul Ehsan. Bazar Darul Ehsan will be offered or opened for tender to parties who can manage Bazar Darul Ehsan. Or perhaps it will be rebranded with a different name. Previously, we gave this responsibility to the Women's Affairs Committee and the Pusat Wanita Berdaya, which carried out many activities there, and at one point it was also taken over, or was to be taken over by HIJRAH. But it could not be implemented. But for next year, we propose that it be opened for tender to outside parties with the capacity to submit a business model for the proposed management of Bazar Darul Ehsan. Because we no longer want to take only one or two operators to carry it out. We want to see what the business model is. Whether HIJRAH or the agriculture department or other agencies that will ensure Bazar Darul Ehsan truly comes alive. Yes. We want to see it, one day it becomes a centre for business development. That means not just kiosks or gathering hubs, but more towards promotion, for example perhaps mini expos, training sessions, seasonal sales could be held there, alongside economic programmes that take into account the local community. Ultimately, what we want to do is see that the activities, programmes and management implementation must be carried out successfully there. That is my answer for Bazar Darul Ehsan.

As for the question from Sijangkang, there is no more.

Tuan Speaker.

Puan Rodziah Binti IsmailPKR · PHBatu Tiga

Ohh, silakan.

Tuan Hasnul Bin BaharuddinAMANAH · PHMoribEN

Thank you, Honourable EXCO. I think the answer is quite clear and also quite convincing. InsyaAllah I feel we can overcome this problem as well as possible. However, I consider security issues to be very important for the Honourable EXCO to focus on. Because twice already, after we repaired it, there was no one to look after it, resulting in theft and damage. And also the management aspect just now, I am very satisfied from the side that it will be... if we, what is this, cannot, if the PWB or HIJRAH cannot implement an alternative to the private sector and other parties, I think it is very important for us to open it, so that we can derive the best benefit from Bazar Darul Ehsan. That is all, thank you.

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Thank you, Honourable Morib. So that is indeed how it is, once we have become clear about who will manage or monitor Bazar Darul Ehsan. The security aspect will certainly be included in ensuring that it is no longer left neglected and ultimately becomes a place for vandalism or vandalism, and it wastes State Government money, which I see is not a small amount actually. If we add it up from the beginning of its construction until now, it is nearly three-quarters of a million, or nearly RM750,000.00 has already been allocated for this matter, yet it still has not yielded any benefit.

Next, the Honourable Sijangkang asked about the issue of rural development. Under vote P01 02005. I would like to state here that I acknowledge there was indeed a reduction in the budget, which had been allocated by nearly RM2 million. For the Honourable Member's information for 2019, the State Government will coordinate the needs for upgrading and repair as well as basic facilities through cooperation with the Ministry of Rural Development. For rural road projects and also public facilities or rural basic amenities. So with this coordination, actually the Selangor Government, as such, is very pro-active, we have already made this effort as early as October 2018. Whereby we have submitted proposals together with the ICU and also under the Ministry of Rural Development. And ultimately we want to see this list be looked at or taken into account by the Ministry of Rural Development and the ICU. But in mid-December, for the information of all Honourable Members, another wish list, or with permission, a proposal of hope, will be conveyed to the Federal Government. Which, after we have gathered these proposals from the Honourable Members, from the Honourable Members, through the District Office, through the MT or JKTD meetings that have been held.

For the answer to Seri Setia, Honourable Seri Setia, has indeed been very concerned about entrepreneurs in urban areas. I would like to say here, we must differentiate between the definition of an entrepreneur and a small trader or hawker. I am confident that what Seri Setia has conveyed or desires is to see entrepreneurs or traders in the city uplifted, that small traders be given an approach so that ultimately they can become successful entrepreneurs. For that, I would like to say here, I see here, there is one matter where we have a missing link, with permission. Between the State Government and also the Local Authority (PBT) all this time. What I have found this time, we see, we must, with permission, reconstruction of thought, which we say here, we need to correct the thinking and the policies that exist, which we have done all this time, although we say reform, that is what we must do. But sometimes the missing link causes it not to reach its destination. That is why this time we want close cooperation between the Stanco Usahawan and the Local Authority. We want to see the Local Authority not playing a role merely in issuing licences. They must play a role in entrepreneur development too. They must play a role as individuals who will ensure the sustainability of entrepreneurs in the cities. That is important because this thought or this policy is what we must put in place so that ultimately it no longer happens that only licences are collected or only summonses are issued, but entrepreneur development is not put in place. So with that, I would like to inform all Honourable Members that under the effort for this reconstruction or rebuilding, we find that, I have already said that within Stanco Usahawan we will gather data, which we obtain from the PBT as well. All this time the data we have gathered has only been data from Stanco Usahawan, or from SITEC, from Stanco IKS. But this time we will also take data from the PBT, and we will categorise these people into which group, how many years they have been involved in small business or whether entrepreneurs in the city can indeed be upgraded, because with this data I am confident that the ecosystem that the Selangor Government has built over these ten years, namely in terms of its training and development, to ensure that they are involved in online business activities and so on, we can infuse into them. So this missing link, InsyaAllah, is what we will work to address, so that ultimately entrepreneurs in the city will also not be marginalised in efforts to ensure this development can be carried out. So that is one of the efforts being undertaken. Please proceed, Seri Setia.

Tuan Halimey Bin Abu BakarPKR · PHSeri Setia

Soalan tambahan.

Speaker

Seri Setia.

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Please proceed, Seri Setia.

Tuan Halimey Bin Abu BakarPKR · PHSeri SetiaEN

I just want to ask whether the Honourable EXCO himself has any targets for obtaining successful entrepreneurs, meaning what is the target per month, for example?

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Oh, you want to ask, there must be targets, for example, let us say we are talking about packaging, with the budget determined at RM500,050, our target for the year is to have 100 entrepreneurs, so to me it is not a monthly level, we would like to achieve that every month, or 100 a year, if it is achieved quickly it becomes a yardstick for us to add more. But for the Honourable Member's earlier question, we need to have data first before we set targets, but for next year's budget, the targets set here are merely to update the database or existing data. But the most important thing I want to say here is that if we talk about what target is to be proposed, I would like to adopt the position of the Ministry of Entrepreneur Development, which has set that the target for producing one million successful entrepreneurs in one term, meaning every year each state is given a target of 50 thousand entrepreneurs to be developed. And I would like to say here that, if we talk about entrepreneurs at the national level, Selangor is indeed the champion, because it was found that more than 40% of entrepreneurs in Malaysia are from the state of Selangor. So that is my answer, InsyaAllah. Ultimately, the Honourable Sentosa asked about the Indian entrepreneur fund. Actually, Honourable Member, next year there is this entrepreneur fund under PK 3003003, which, if we look, next year we have allocated RM1 million. I would like to inform you why it has been placed, or its amount is somewhat reduced compared to previous years. This fund is actually no longer lumped together or combined. Previously, within this RM3 million, and we also see that it was not fully spent, based on the information I obtained, it did not even reach RM1 million utilised by this programme, but what I see is that actually next year's budget can be properly directed to its targets with a little reshaping of the programmes implemented. So this fund, I mentioned it, is combined together with entrepreneur development for which we have created the ecosystem, of which RM1 million is under Entrepreneurs and the remainder under the Small Industries Committee, under Agriculture, and also HIJRAH, and I am confident Selangor no longer practises a divide-and-rule system. We aim that when we talk about entrepreneurs later, we will continue or give to all parties, but given that we see the Indian community is rather marginalised in income

and also in entrepreneur development, this is why a specific budget has been placed, this budget, I want to state here, Honourable Member, namely that the first is to identify Indian B40 community members who have potential to be involved in business. The second, once we have identified them, we will conduct training and coaching sessions that will be implemented not only in several groups or NGOs but we will link or connect them with several existing and more capable government agencies. And ultimately we hope they will be given matching programmes...

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Let me finish first, namely that ultimately from this RM1 million we will run a matching programme, with permission, for agencies that can provide funding assistance and business grants to the Indian community or entrepreneurs whom we have identified can have their livelihoods uplifted through business. Yes, please proceed, Pelabuhan Klang.

Tuan Azmizam Bin Zaman HuriPKR · PHPelabuhan KlangEN

Thank you, Honourable EXCO. May we in this august House know why the allocation of RM3 million was not fully used?

Puan Rodziah Binti IsmailPKR · PHBatu TigaEN

Thank you, Honourable Pelabuhan Klang, a good question. I think that is, if we are like, how do people say, eager, with permission, so enthusiastic in requesting allocations, but when we are not clear, I can see, what I found is that the details of that RM3 million were not very clear as to how it would be used, and when it was only implemented by several NGOs and the model placed was somewhat deficient, namely it was managed by individuals given a mandate by the government. So that is why I have taken back that responsibility and let it be managed under STANCO Usahawan so that STANCO Usahawan can ensure this programme can be widely extended to all the state constituencies and we can also attract many more agencies to be involved in this programme. So that is the main reason, that is why the capacity for its implementation could not be utilised, and ultimately the existing allocation could not be implemented, and secondly, perhaps because of the recent elections, the programme could not be implemented, which took about four months actually. Thank you.

SpeakerEN

Right. Questions? That's it, we've missed the train. I invite Kota Kemuning.

Tuan Ganabatirau A/L VeramanDAP · PHKota KemuningEN

Thank you, Mr Speaker, thank you to the Honourable Members who have touched somewhat on my STANCO. I thank the Honourable Seri Setia who asked whether the Back to School Programme would be implemented through the State Assembly Service Centre (Pusat Khidmat DUN), which continues. Actually, for the Honourable Member's information, in the 2018 Budget, that is last year, there was the Back to School programme under STANCO at that time, which was STANCO Kemiskinan, and the Back to School programme still continues, implemented by MBI Selangor through the Pusat Khidmat DUN. That programme, I understand, still continues through UPEN, namely through MBI Selangor. Apart from that, this school assistance programme, when we placed it under STANCO Kemiskinan, the programme was in fact merged with the Kasih Ibu Smart Selangor (KISS) programme, where, apart from receiving basic necessities, beneficiaries also have the opportunity to receive school supplies assistance including shoes, school bags, books, stationery and uniforms, and so on.

Tuan Halimey Bin Abu BakarPKR · PHSeri Setia

Tuan Speaker.

SpeakerEN

Yes, please proceed, Seri Setia.

Tuan Halimey Bin Abu BakarPKR · PHSeri SetiaEN

So, Honourable EXCO, do you mean that this time there is no provision, that MBI does not give school bags to the State Assemblyman's office, or how is it?

Tuan Ganabatirau A/L VeramanDAP · PHKota KemuningEN

Thank you, Seri Setia. Actually, before this, the implementation was like this. It went through the Poverty STANCO (STANCO Kemiskinan), so when the programme went through the poverty special allocation, which we allocated to each State Assembly seat (DUN) in the form of goods or vouchers, now this programme that is continued, actually this programme is indeed continued through MBI Selangor, so the programme they plan, they will contact the DUN with their own plan. It is not placed under any STANCO. That is the first point.

Thank you to the Honourable Member for Hulu Kelang, who raised the issue regarding the poverty eradication programme, and who stated that the Honourable Member said there was no focus or agenda that needs to be coordinated. In an effort to improve the standard of living of the people and to provide continuous benefits to the people, the Selangor State Government constantly diversifies programmes and initiatives in empowering the people to break out of the cycle of poverty. The main focus and agenda of the State Government in the effort to eradicate poverty is to bring well-being to the people's lives, as all of us are well aware, the poverty eradication programmes cover and cut across various clusters including health, education, housing, agriculture, welfare and many more. All these programmes and initiatives are implemented and coordinated by the State Government through various Standing Committees and Departments or agencies, using allocations that have been determined under their respective departments. In ensuring that the people, especially the underprivileged, always benefit and continue to enjoy prosperity and well-being. The State Government welcomes and warmly receives any suggestions or proposals for improving the poverty eradication programmes, especially proposals for the re-coordination of all poverty eradication programmes. Therefore, the State Government will review the feasibility of this proposal, taking into account various factors and needs from time to time. That is all, Honourable Member.

SpeakerEN

Thank you, Kota Kemuning. I invite LembahJaya.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Thank you, Mr Speaker. I will only touch on the matters that were raised. First of all, the Honourable Member for Banting, who asked about Sysmex. So the Sysmex application is an application that can be accessed by the public to check the land use status and also the proposals for all areas in the State of Selangor. Only this system is currently having its server upgraded in order to further increase its capacity and also the effectiveness of access. The process of upgrading this server and data migration is still ongoing and is expected to be completed at the end of December 2018. So users will be able to use this application again in early 2019 if all data migration runs smoothly and the department together with the vendor are doing their utmost to ensure it is completed by the end of this December.

I would also like to answer or give clarification to Pelabuhan Klang. There is no Pelabuhan Klang. Never mind, I will go to Bandar Utama. The Honourable Member for Bandar Utama raised the matter of an allocation for renovating flats, which only totals 10 million. So for the Honourable Member's information, actually we are in a framework of cooperation with Bandar Utama, though there is none. However, we have actually already drawn up a framework of cooperation with the Ministry of Housing and Local Government (KPKT), so we have actually already submitted the renovation list for this Ceria Scheme to KPKT for this year. So for next year we will entertain or receive new applications.

Next, Bandar Utama also asked how the problem of water supply being cut off due to inability to settle water bills because of bulk meter usage can be overcome, so for those who pay their bills consistently also

are affected by this water supply cut. So my suggestion is for them to migrate the meters, to change the bulk meter to individual meters. So the meter reading is according to individual usage, so the water supply cut is based on those who do not pay their bills. I want to explain here why I am very well versed in the problems faced by these high-rise housing areas. For ten years I have been looking after areas that have this problem. I found that most of them do not settle their water bills or building maintenance bills and so on, it is their attitude, yes, not that they cannot afford to settle the bill, only that they demand better services but at the same time do not pay the bills. So, this has become a continuous and prolonged problem. So, if those who truly cannot afford it are perhaps around 20% to 30%. So, for the collection or maintenance fee collection of 70% that...

SpeakerEN

Bukit Gasing, please.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Already... I will finish first. I know Bukit Gasing will raise this matter. Collection of 70% of maintenance fees is actually already sufficient to finance building management and also to settle the bills. So, this is what we often find happening. I want to tell you here that there is actually a low-cost flat apartment that has succeeded in achieving collection of almost 100%. So, I see this is not an impossible matter. It is only that we need a change of mindset from always depending on help from the government to changing our attitude to being responsible for what we do. Please, Bukit Gasing.

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Thank you for giving way. The problem is not that all residents in one flat are irresponsible. Only the majority are irresponsible. So, the minority become victims. So, we as the government must be fair to this minority who want to be responsible. So, for many flats such as in my area, they still have not carried out migration. The JMB does not undertake migration. So, who is going to undertake migration? So, consumers who want to pay and may already have paid their bills to the JMB become victims because the JMB does not carry out migration, and we as the government cannot answer, asking them to carry out migration, because that answer is "it's too simply stake", with permission.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Bukti Gasing must realise that one institution or one party that can carry out this matter, if there were no JMB, is the COB. The COB is the party responsible for facilitating this process. So, I see it is indeed easy to hand everything over to the government. Sit down first Bukit Gasing, wait until I finish answering first. Bukit Gasing can also play a role, yes, in raising awareness among residents or occupants or owners of lots and units who do not settle their payments. Because this is the party that we need to give understanding to and also raise awareness that they are the cause of the problems faced by friends who are committed or consistent in settling their bills, whether water bills or building maintenance bills. So, we actually, what is it, go to the wrong party actually to, what is it, to voice out everything, grousers, with permission. It should be those who do not settle their bills who should be made aware. So, I see that....

Mohon mencelah.

Ya, Kuang.

Speaker

Kuang, Kuang.

Tuan Sallehudin Bin AmiruddinBERSATU · PHKuangEN

I do agree with what was said by Bandar Utama regarding this Joint Management Body. We understand that the hardship of residents or owners who live in the terrace houses....

SpeakerEN

But did Kuang debate this issue just now?

Tak ada.

Tak ada.

SpeakerEN

I think Kuang did not debate, so Kuang may sit down, yes. Please sit down.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

So, allow me to answer...

SpeakerEN

Bukit Gasing. Does Bukit Gasing want to interject?

Tuan Rajiv A/L RishyakaranDAP · PHBukit GasingEN

Mr Speaker, although not debating, I want to respond to what was answered.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Bukit Gasing also did not raise any related issue.

SpeakerEN

So, Bukit Gasing also sits down for fairness. For the sake of Bukit Gasing's fairness, Kuang has sat down, so Bukit Gasing also sits down.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Thank you, Mr Speaker.

SpeakerEN

Ask the EXCO to continue.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

I would also like to touch on the lifts that are broken or that have failed to be maintained. For the time being we have, what is it, proposed that these lifts be maintained by the relevant lift companies. So, they are more knowledgeable about what the lifts they manufacture or produce need. So, this is to overcome the problem of lifts that are frequently maintained but also frequently break down, yes. So, this is an issue that is faced. I also want to answer Kampung Tunku, which raised the matter of there being no allocation for environmentally sensitive areas, yes. So, for Kampung Tunku's information, actually the study on environmentally sensitive areas was carried out or implemented by the Department of..., what is it, Town and Rural Planning (JPBD), actually. So, the State JPBD did not do it. So, there is no allocation there. And, slightly related to the Air Manis RSKU Project, Sabak has none. Just for the information of this House, the project is actually in the process of being altered because its development is on peat soil. So, the development must follow the new guidelines issued by JPBD and if, what is it, PNSB has carried out that alteration, then the development project can actually be implemented. That is all. Thank you, Mr Speaker.

SpeakerEN

I invite the next EXCO to give an explanation, the Honourable Seri Serdang.

Puan Dr. Siti Mariah Binti MahmudAMANAH · PHSeri SerdangEN

Thank you, Mr Speaker. Thank you to all the Honourable Members who asked about several matters under my portfolio. First, I want to answer according to the subject, yes, first EIP, yes, the Early Intervention Programme that was asked by Gombak Setia and also from Sementa. For the information of the Honourable Member, this EIP programme is indeed continued. From 2017 the allocation was RM3 million, 2018 also RM3 million and 2019 also RM3 million. So, this programme will indeed be continued according to, what is it, the information I have, in 2018 a total of 650,000 was given to the associations related to these special children and some other welfare associations and the existing policy that is available now is that they,

this assistance is a one-off aid, the first time RM100,000.00, the second time RM50,000.00 and the third time RM30,000.00. And then we will also turn to other associations, other organisations too, so that they all enjoy, yes, allocations to help these EIP centres, yes, and this year, InsyaAllah, there will be further allocations for them, for these organisations. For the information of Gombak Setia and Sementa, Gombak Setia has none but Sementa does, for 2019 for this Early Intervention Programme, apart from direct contributions to institutions that receive these special children, we are expanding this EIP, firstly to expand the accessibility of special children to ordinary taska (childcare centres). For the information and knowledge of all, perhaps everyone already knows that special children are difficult to be accepted by ordinary taska because their teachers need to be trained and also because no taska wants to accept them as the cost for them to set up this service is quite high. So, as a start we will help the taska to train one of their teachers. We call this programme Cikgu Anis (Cikgu Anak Istimewa) and InsyaAllah each DUN will have four taska and one taska will have one teacher whom we give training to and they, when the taska has the means, can be ready to accept special children, all types of special children. And this programme we will continue. Next, we have what we call the Special Children Assistance. We are trying to establish a fund that can help the community-based rehabilitation (PDK) organisation centres, InsyaAllah this allocation will also be used. Next, I want to mention the matter of women's health earlier, if I am not mistaken, the Honourable Ijok. Mr Chairman, if the Honourable Ijok is not here, never mind. Honourable, shall I...

SpeakerEN

Yes, if the Honourable Ijok is not here, it is up to the kindness of....

Ok.

SpeakerEN

The Honourable EXCO's discretion whether....

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

The answer is short only because the Honourable Ijok, the Honourable Ijok, raised the matter of, what is it, the welfare of single fathers. Actually, it is indeed in my plan...

SpeakerEN

That is very interesting indeed.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Yes. But in my plan, single fathers, their situation is like single mothers, especially when they look after their own children, so the problems they face are also the same. They have to send their children to nursery and so on, and they also cannot work because sometimes they have to look after their own children. So, we will hear for ourselves what they need, as long as they do not ask me to find wives for them, I'm okay.

SpeakerEN

If possible, if possible.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Mr Speaker, so indeed there is, in, in, in my mind, that we also need to attend to single fathers just like single mothers, and I am exploring this because we have several programmes for single mothers. Among them is work from home, whether they, while looking after children at home, are willing to also do work from home. If they like it, we will include them, put them into these work from home programmes, yes. Regarding the hospital, earlier the Honourable Ijok asked about Selgate Hospital, yes, which will be built in Rawang. Only I want to ask, if all Honourable Members say I should continue, I will answer, if not, I will wait for the question to come in the next session. How, Honourable Members, do you want to hear or not?

May I put a question to the Honourable Seri Serdang?

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Just now about the hospital.....

No. About what was just said, the single father.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

Single father, ok.

SpeakerEN

I give way.

Thank you, Mr Speaker, yes. Actually, the problem mentioned by the Honourable Ijok just now is not merely single fathers, because now the term single father, is it, likewise single mother, or, with permission, single mother, are those who have the status of grandmother and grandfather, if they are single mothers, is it included in the clause that is said to be single mother and single father, yes? Because there are single mothers, of course sometimes there are also single grandmothers. There are single fathers, there are single grandfathers, like that, with permission. I humbly request an explanation from the Honourable Seri Serdang.

Puan Haniza Binti Mohamed TalhaPKR · PHLembah JayaEN

I think if it is single grandmother, single grandfather, I would include them in the Senior Citizens Programme (Program Warga Emas), yes. Yes, because it is slightly different, if they want to join that programme it is no longer the same, right? So, if single mother, yes...ok, joke aside. Regarding the Rawang Hospital, how is it, Honourable Members? No need, yes? Good. Next, I think that is all, regarding what was brought up by the Honourable Sementa, about the PWB programmes. Indeed, Honourable, the PWB programme will be continued as it was left by the Honourable and I have taken over this task. Regarding the work from home programmes, we are still looking for corporate parties and associations who are willing to share skills for us to train mothers, to these women. Regarding the PW Shop, Honourable, there is indeed a plan that the Honourable left behind, it is indeed also in the plan. We only, for now, because the products are said to be only 20 products, we are targeting one product for each DUN. So, we should have 56 products, because if we do, what is it, a bit of calculation, these 20 products are not cost effective for us to set up one PW Shop, PWB Shop, meaning we would have to bear the cost of the shop, bear the cost of, what is it, workers and so on, whereas our products are only new at 20. So, in lieu of this, Honourable, for the information of UTC at Anggerik Mall, it has been taken over by our UPEN Division, we will make it an exhibition centre. And when we have enough products, we will help women to sell them through, we now have the internet, sales online. That is in our long-term plan, and I want to say, perhaps we have an intuition, I too think, indeed, we are close to programmes like this, I would say, with permission, great minds think alike. Whatever the Honourable said, all of it is indeed included in my discussions with the current Standco. I think that is all, thank you, Honourable Mr Speaker.

SpeakerEN

Thank you, Seri Serdang. I invite the Honourable EXCO for Pandan Indah.

Tuan Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

Thank you, Mr Speaker. Honourable Members have raised many questions and debate points regarding the motion on the Development Expenditure Allocation that has been discussed. Most of these, I have, to some extent, already touched on in my winding-up speech and also in answering the oral questions. However, I will try my utmost to answer the issues raised in more detail. The first, from the Honourable Morib, concerns the installation of Geo Bags at Pantai Kelanang. For the information of the Honourable Member, the Pantai Kelanang project was completed on 31 May 2017, and according to the contract, the sand had to be taken from an area outside the coastal strip

not taken from the same place. The design method adopted by the consultant for these Geo Bags is actually intended to reduce the impact of waves or swells from the sea on the embankment and bank, so as to reduce erosion or the durability of this embankment. The aim is so that mangrove trees can grow, and it is now found that mangrove trees have begun to grow after this project was completed. As for the issue regarding Bazar Darul Ehsan by the Public Works Department (JKR), this has already been answered by the Honourable Batu Tiga earlier. As for the question from Sejangkang.

SpeakerEN

The Honourable Morib asks.

Tuan Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

Not satisfied yet, please.

Tuan Hasnul Bin BaharuddinAMANAH · PHMoribEN

Thank you EXCO, thank you Speaker. The answer from the Honourable Member just now, namely that the sand for the Geo Bags was taken from outside, but from my observation it was taken from nearby areas, and within a few months the muddy condition on that beach was indeed evident. So sand is being extracted from nearby areas, I hope an investigation will be carried out. That is all, thank you.

Tuan Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

We take note of what the Honourable Member has just said. We will take it, and we will carry out monitoring on this matter. As for the question from the Honourable Sejangkang, who is not here, I will move on to the next, namely from Banting, regarding the allocation or development said to be rather limited in Kuala Langat. So for now, there is no allocation under P13 for Flood Retention Works in the Kuala Langat District. However, other works being carried out can reduce flood problems, such as the work of Building a Retention Pond and Pump System in Bandar Pekan Banting, Mukim Tanjung 12, which will be completed at the end of this December at a cost of RM6.83 million. Apart from that, the project to install four large-capacity screw pumps in the Kuala Langat District at four locations at a cost of RM4.37 million is also being carried out. The pumps will be installed at the Bukit Canggang area, the Flood Retention Scheme at Tanah Belia Labohan Dagang, and Paya Rumput. As for the question regarding the issue of Federal Road 5, this was much discussed in the oral questions and the winding-up questions on that day. We take seriously the issue of the upgrading development concerned, and we will take all the Honourable Member's views to be extended at the Federal level. As for road safety, the JKR is always committed to this safety aspect, and we, under the traffic management plan, include the requirements for safety signboards, traffic officers, and the safety equipment that must be present at construction sites. Only sometimes its monitoring is rather less effective and will

be improved. Apart from that, the use of traffic lights or street lights at risky areas is also under the road safety audit, which will be monitored from time to time. Regarding the question from the Honourable Teratai about the allocation said to be RM89 million under the Department of Irrigation and Drainage (JPS), yet still insufficient because the maintenance works are still inadequate. Apart from enlarging rivers and drains to increase river capacity, upgrading maintenance works on flood retention ponds is also one of the components I have mentioned. Apart from maintenance of the drainage and channel system, maintenance must also be carried out on flood retention ponds to reduce the impact of floods. Maintenance costs amounting to RM3.24 million are allocated for upgrading works, although they are related to maintenance, but I also mention this because we are discussing development. In the allocation for upgrading works, three projects for upgrading retention ponds currently being implemented in 2019 are as follows. First, Sungai Jelok in Mukim Kajang with RM1.8 million, in Taman Permata for the whole area, for the whole of Mukim Dengkel RM1.52 million, and Kampung Tok Aminuddin in Mukim Dengkel also RM258,000.00. In addition, the JPS also received an allocation of RM1 million for maintenance of JPS ponds throughout the State of Selangor. Regarding the water supply problem in the Tasik Permai area, which has experienced disruptions three times in the last few months, and the latest on 24 November 2018, this was caused by the main pumping main, or main pumping pipe, bursting on the third party's side. Repair works were completed the next day, on 25 November 2018. However, because the Tasik Permai area is at the end of the water distribution system, it receives its water supply later than other areas. To overcome this problem in the future, Air Selangor will conduct a study and review of the distribution system to speed up the water recovery process to Tasik Permai so that any disruption will not cause them to receive water late, the water supply. Regarding the question on traffic lights and street lights mentioned here under PK1 raised by the Honourable Teratai and also the Honourable Dusun Tua. For everyone's information, all allocations for upgrading or installing traffic lights and street lights are not under PK1; they are under PK4 and have been distributed to the districts. If you look there, all districts have an allocation of RM500,000.00 for installing traffic lights and street lights. All districts received RM500,000.00, except the Kuala Langat District, which received RM550,000.00, which is RM50,000.00 more for next year. So I do not know why it is RM50,000.00 more. Next, the question from Dengkil, yes. Dengkil. For the question from Dengkil asking why there is no allocation under PK2 for the Sepang District. For the information of the Honourable Member, there is indeed no specific allocation under PK2 for the Sepang District for the Drainage Upgrading Project. However, the JPS, or Department of Irrigation and Drainage, is implementing Flood Retention Scheme (RTB) projects in the Sungai Semarang, Sungai Jenderam, Sungai Parit Tampoi and Kampung Sungai Buah areas, with an allocation for 2019 totalling RM4.2 million. The JPS will propose and apply for an allocation to upgrade the drainage system, for drainage in the RMK12 for the Sepang District mentioned earlier.

Tuan Adhif Syan Bin AbdullahBERSATU · PHDengkilEN

Point of clarification, Honourable EXCO.

Speaker

Ya Dengkil.

Tuan Adhif Syan Bin AbdullahBERSATU · PHDengkilEN

Because there are several sand-dredging activities at Sungai Jenderam. Is that within the scope of the river upgrading works?

Tuan Ir. Izham Bin HashimAMANAH · PHPandan IndahEN

I need to check that question, because the RTB, the Flood Retention Scheme, does indeed involve components such as enlarging the river and also deepening the river. That is part of the Flood Retention Scheme. As for the question regarding pedestrian safety and traffic lights mentioned here concerning the UiTM student who was seriously knocked down, for the information of the Honourable Member, the road in question is Federal Road FT214. However, the Department will prepare a project proposal paper and it will be forwarded to the Road Branch, JKR Malaysia. And regarding Olak Lempit, which is also Federal Road FT31, the application to upgrade traffic lights and street lights from Olak Lempit to the Sepang District, with an estimated cost of RM1 million, was made in October 2018 for implementation next year. The budget of RM1 million has already been obtained and will be implemented next year. As for the issue relating to traffic lights that cut out during heavy rain and storms at the Dengkil Police Station Junction on FT31, improvement works were carried out in October 2018 and were completed on 22 October 2018. It actually involved replacing many cables, and it was slower because the underground cables had to be repaired. I would like to continue to the next question, regarding the question from the Honourable Kuala Kubu Bahru about the PKPM issue. Actually, there is none, so if there is none, I will proceed. The seventh is the question from the Honourable Bukit Lanjan about the allocation for the flood retention study mentioned here, which is only RM12,800.00. RM12,800.00, what can be done with such a very small six-figure amount under the Petaling District? So regarding the allocation concerned, it is under PK10001. This is an item specifically earmarked for the final payment for the design works of the RMK11 flood retention projects. It is not the construction implementation project; it is a design project. And at the final stage, the physical implementation of the Flood Retention Projects in the Petaling District has been allocated RM17.7 million, through PK1, the flood retention scheme, and PK2, drainage upgrading. The projects under PK1 are the Sungai Kedondong Flood Retention Project at RM1 million, the Kampung Melayu Subang Flood Retention Project on Sungai Pelempas at RM11 million. The Project to Build Flood Control Structures at Taman Mesra in the Seri Setia State Constituency (DUN) is RM200 thousand, while under PK2, drainage upgrading, are the Upgrading Works for the Main Drain and Internal Drainage System at Kampung Bukit Lancong and Kampung Sungai Baru at RM2 million, the Upgrading Works for the Main Drain and Internal Drainage System at Kampung Seri Aman at RM2 million, and the Pump Upgrading and Retention System Construction Project at Kampung Padang Jawa at RM1.5 million. Regarding the flood incident in Damansara Damai, the State Government through the JPS will investigate, because this is the first time we have received a flood report from that area and it was not included in the hotspots listed below. So we will monitor and look into the situation there.

Puan Elizabeth Wong Keat PingPKR · PHBukit LanjanEN

Mr Speaker. I would like to ask for an explanation from the Honourable Member.

SpeakerEN

Honourable Bukit Lanjan, please sit down. Honourable Members, the time has shown 6 p.m. Accordingly, I adjourn the House until tomorrow, 5 December 2018, at 10.00 a.m. The House is adjourned. (The House Adjourned at 6.00 p.m.)