Selangor · 10 November 2020
14th Assembly, 3rd session, 3rd meeting · 341 turns · 41,075 words · official PDF ↗ · Digital Hansard ↗
ExperimentalSelangor publishes one PDF per sitting day; recent ones are drafts (Draf Penyata Rasmi). Full written answers are published for 2018-19 only.
(Opening)
Good morning and greetings of peace. The Order of Business for the Third Meeting of the Third Session of the Fourteenth Selangor State Legislative Assembly on 10 November 2020 began with the recitation of prayers.
Bacaan Doa.
Oral QuestionsQuestions
The next item on the Order of Business is questions.
Assalamualaikum warahmatullahi wabarakatuh and greetings of peace. I invite Sungai Panjang to ask the first question.
Thank you, Honourable Deputy Speaker. My question is No. 88.
Oral Questions — 88. Selangor State Tourism Sector Post-Covid-19Questions
88. To ask Y.A.B. Dato' Menteri Besar:-
a)
What are the efforts and actions of the State Government in reviving the Tourism Industry post-COVID-19?
b)
State the target groups in the revival of the Tourism Industry at the State of Selangor level?
c)
What is the total expenditure that has been spent on the revival of the Tourism Industry post-COVID-19?
Thank you to the Honourable Sungai Panjang. Asking about the problems of the tourism industry in the post-COVID-19 period. The State Government, through Tourism Selangor, is taking proactive steps to develop and revive this industry again in the COVID-19 situation, as follows. First, the Economic Stimulus Package through one-off assistance to tour guides/community hosts/licensed homestay coordinators of RM1,000.00 each. Second, the Economic Stimulus Package through the issuance of the subsidy "Selangor State Tourism Voucher" with an allocated assistance value of Ringgit Malaysia Two Million (RM2,000,000.00). Third, the organising of the Tourism Promotion Campaign "Nak Bercuti? Pusing Selangor Dulu" which places emphasis on the domestic market by using social media, digital and online platforms. Fourth, new-normal tourism promotion activities through involvement in tourism promotion programmes that use digital and online platforms, such as the organising of the Selangor E-Travel Fair promotion programme, where Tourism Selangor can connect and interact directly, without face-to-face contact, to convey offers and the latest information on the tourism industry in the State of Selangor to tourism agencies, tourism product operators and other parties related to the tourism industry, as well as tourists. Fifth, the organising of the Selangor State Persona Tour Programme specifically for the domestic market, such as to the State of Penang and Terengganu. Sixth, tourism promotion campaigns through advertising mediums of "Outdoor Billboard", "Unipole" and "Digital Billboard" in several selected areas such as Johor, Kedah, Terengganu, Melaka, Kuala Lumpur and Penang. Seventh, the organising of the Familiarization Trip (FAM Trip) programme involving the media and local and international tourism agencies. Eighth, the provision of tourism packages involving integrated promotion between 9 Districts and 12 PBT (Local Authorities) in the State of Selangor. Ninth, the organising of new-normal tourism events that emphasise the SOP (Standard Operating Procedure) in accordance with the recommendations of the National Security Council (MKN).
To answer the second question, the target groups in the revival of the tourism industry at the State of Selangor level are as follows. First, licensed hotel operators. Second, licensed homestay operators. Third, tour guides. Fourth, theme park operators. Fifth, local community hosts. Sixth, SMEs directly involved in tourism activities through collaboration with the Exco for SME Development. Seventh, handicraft operators. Eighth, tourism agency operators.
For the purpose of reviving the tourism industry, the State Government, through the Selangor Prihatin Economic Plan Package, has taken the initiative of introducing a tourism voucher subsidy with an issuance value of RM 2 Million (Two Million Ringgit) to help revitalise the tourism industry in the State of Selangor in particular. In addition, the one-off initiative of RM 1,000.00 (One Thousand Ringgit) for Tour Guides, Local Community Hosts and homestay operators has been taken, with a total allocation of RM553,000.00. To revitalise the tourism industry, the State Government through Tourism Selangor has allocated expenditure of
RM2.9 Million up to October 2020 for the implementation of the Tourism Promotion and Events Programme, including the implementation of the "Nak Bercuti? Pusing Selangor Dulu" campaign. Thank you.
Soalan Tambahan.
Sungai Panjang.
Thank you, Honourable Deputy Speaker, thank you to the Honourable EXCO. My supplementary question concerns the promotion or events planned under the new-normal conditions. I would like to request an explanation of the form of promotion that has been planned or will be implemented under the new-normal conditions. Thank you.
Thank you, Honourable Sungai Panjang. For the time being we are still bound by the PKPB, so many face-to-face tourism promotions cannot be carried out. Therefore we can only run them online. Online promotion. As I mentioned earlier, we have organised the Selangor E-Travel Fair promotion programme, where we try to promote through the internet and also promote in other forms, but not in large gatherings. That is what we can do. We hope that after this PKPB is over, we will launch several large-scale promotion programmes to promote the State of Selangor so that Malaysians from other states can come to Selangor to holiday.
Soalan tambahan.
Kota Damansara.
Thank you, Honourable Deputy Speaker. In Kota Damansara, as far as I know, there is the Kota Damansara Community Forest. Apart from this location, has the State Government identified any other location that can be used to promote Kota Damansara itself?
For the time being, we have no plans to promote the Community Forest in Kota Damansara. But for now we have several locations involving attractive forest reserves, such as Sungai Congkak and Sungai Kanching in Gombak and other places that we have promoted before. But for the Kota Damansara Community Forest, we will take note of it, because I have learned that many people now engage in hiking activities, mostly going to Kota Damansara because it has become an attraction.
Not only tourists but also those who like hiking, they often go there. I will take note of it. Thank you.
The next question. Permatang.
Thank you, Mr Deputy Speaker. My question is No. 89.
Oral Questions — 89. Special Children Assistance (ANIS)Questions
89. To ask Y.A.B. Dato' Menteri Besar:-
a)
How long does it take to process an ANIS application?
b)
Please state the total allocation as well as the effectiveness of the Special Children Assistance (ANiS) in 2020, especially in helping the group concerned during the COVID-19 pandemic?
Thank you, Honourable Permatang. The Honourable Permatang asked about applications for the Selangor Special Children Assistance and how they are processed and their effectiveness. Mr Deputy Speaker, I would like to inform you that the Selangor Special Children programme was launched in 2019. As a pilot project it was administered from the office of the Standing Committee on Welfare, which means it began in my office. So, after we implemented it and understood these applications better, in 2020 the project began to be implemented by YAWAS. Payments and so on. So the allocation was placed under YAWAS, but my office and I myself are still reviewing these applications because we are still in the process of improvement. For the information of the Honourable Permatang, the Selangor Special Children assistance that is now being processed at YAWAS takes 15 to 26 working days.
The Selangor Special Children application process covers three (3) phases. First, the process of registering and checking applications into the system, carried out by YAWAS, takes 3 to 5 working days if the application documents are complete. If the application documents are incomplete, the application form will be returned to the Community Service Centre, and this will take longer depending on how long it takes to complete the documents. Among the documents required are a quotation from the therapy centre/support equipment/medicine or food nutrition from a pharmacy, and it also requires verification, whether using a referral letter from a medical officer or using the OKU card itself. In this phase, applicants can also check the application that has been registered in the system and whether the status of the application is successful or not based on the application conditions.
Phase 2, the approval process by the office of the Y.B. Chairman of the Standing Committee on Health, Welfare, Women and Family Empowerment, takes 7 to 14 working days. This process involves checking the list of eligible applicants based on the category of disability for approval of the amount to be paid to recipients. Usually, although we have approved in principle a maximum of RM5,000.00 per special child, because so many people apply, we usually only give 50% of their application. The third process is the payment process to successful applicants, and payment is made by YAWAS by Electronic Fund Transfer (EFT) to the recipient's account, namely their parents, within 5 to 7 working days.
The Selangor Special Children Special Assistance Programme was first introduced with a fund allocation of RM500,000.00, and the programme continued in 2020, with the number of beneficiaries so far being 146 recipients from 2020. For applications in 2019, 291 were approved. And overall, this programme not only helps the special children group in facing the COVID-19 pandemic situation, but the continuous implementation of the programme also indirectly demonstrates the State Government's concern for this special group, in line with the initial objectives of implementing the Special Assistance programme for AnIS as follows. First, helping to ease the burden of living, rehabilitation and education costs of children with disabilities borne by the parents/guardians who apply. Second, helping to ease the burden on parents/guardians of children with disabilities in covering the screening/health costs of children with disabilities, which usually take a long time at government hospitals. And third, helping to reduce the burden on parents/guardians of children with disabilities who wish to purchase special equipment for the rehabilitation of children with disabilities. Thank you.
Sijangkang.
Thank you, Mr Deputy Speaker. I want clarification: what the EXCO mentioned just now, that referral letters can also be used as proof of application. However, these referral letters, because sometimes they do not reach the final diagnosis, yes, most of them
are just a provisional diagnosis. I am not sure whether that is sufficient, because there are applications that sometimes with just a provisional diagnosis cannot be used or accepted. Thank you.
Yes, thank you, Honourable Sijangkang. It is true that sometimes when there is an OKU card, it helps, yes, it helps a lot, because it is already clear that the diagnosis process has ended. Our problem is that, as the Honourable Sijangkang often mentions, they do not register, and when they apply for assistance, we need a referral letter. Usually the referral letter given is not so much in the form of a diagnosis but of needs, yes, because usually, that is why the documentation needs to be scrutinised by someone who understands. That is why at the early stage, I myself saw it, when they give, explaining the disability and the problems faced, what is important for us is the referral through needs. For example, needs, certain equipment and so on, from the doctor or from those who deal with special children, yes. This is what we need, and indeed we need to carry out verification. I myself call, yes, doctors or specialists, for example, the Audiologist, also the Speech Therapist, the Occupational Therapist, to obtain further information, yes. So, indeed this is the process we are going through, and in the improvement, Honourable Member, thank you.
The next question, Subang Jaya.
Thank you, Mr Deputy Speaker, Subang Jaya question number 90.
Oral Questions — Lra Sungai RasauQuestions
90. To ask Y.A.B. Dato' Menteri Besar:-
a)
Please state the detailed schedule of each stage of the construction of the Sg Rasau LRA.
b)
What is the current status of its implementation?
c) Will this project be delayed?
Thank you, Mr Deputy Speaker. The Honourable Subang Jaya asked a question regarding the status of the construction or development of the Sungai Rasau Water Treatment Plant (LRA). For the Honourable Member's information, the development of the Sungai Rasau Water Treatment Plant is at the feasibility study stage, which is the stage of studying feasibility and implementability, carried out by a Consulting Engineer appointed by the State Economic Planning Unit, and it is expected to be completed this November. Subsequently, Air Selangor has also begun calling tenders for an Owner's Engineer to prepare the detailed study or documentation regarding the specifications and the procurement of the system there. This project is an important project in the 30-year water supply development plan of the State of Selangor, and we cannot, failure is not an option. Failure is not an option, yes. This is an important project that we will implement. It is not only that we are delayed; in fact, it is not a delay, we are bringing it forward. We have already set the date for completing this project in 2024, which is about four (4) years from now, to be completed with the current capacity, yes. The study, based on the current study, is 700,000,000 litres a day, which is intended specifically for the distribution of water supply to the Klang region. "Wilayah" here means, the region in terms of water, not our district, yes, according to the water district, water supply. That is for Klang. And also our proposal for Rasau Phase 2 will also be completed in 2028 with the same capacity of 700,000,000 litres, for distribution to the Petaling region. This is an important project for the State Government to implement. For the Honourable Member's information too, the detailed design or specification work related to the implementation will begin, as I mentioned earlier, after the feasibility study is completed, and we will, another aspect apart from the technical aspect, is the financial aspect, which is also financing, yes, it is an important matter, which is why we will examine the implementation of the upstream water source works, sources of works, source work, because it requires grants, grant funds from the Federal Government amounting to RM500 million under the Twelfth Malaysia Plan. Thank you.
Soalan tambahan.
Pandamaran.
Thank you, Mr Deputy Speaker. I just want to ask, when the Sungai Rasau LRA has been built, will this channel from SSP1, SSP2 and SSP3, yes, from the Selangor River, continue to be channelled to Klang or will it be stopped? I understand that Klang, the Klang district, its water supply comes from the Selangor River and Rantau Panjang.
As I mentioned in the debate, or the winding-up of the recent Budget speech, the development of the water supply system in the State of Selangor not only focuses on the treatment plants, but is also coupled with the issue of distribution, or its distribution system, namely reticulation. So, and for this purpose, we will look at the entire existing system, especially its pipe system, and also the balancing ponds, main ponds and service ponds that need to be upgraded. For example, among the balancing ponds that are important for Klang is at Lipat Kajang. Lipat Kajang is indeed included in the framework to be upgraded so that its capacity is larger and can increase water storage to a higher level. This means it is not only the treatment plant. The treatment plant is important, yes. We have our target, every year how much capacity, or, that we increase. Right now we have around 5,000 million litres a day of our needs. In two years, three years more, it will increase from 6,500 to 7,000. How many years ahead is this? I think every five (5) years we see, there is an increase of around 1,000, 800 to 1,000 million litres every five (5) years. So, we have that target, that is what we will develop, but what is also important is for us to create that interconnectivity. The continuity between these main ponds so that they can be distributed evenly or systematically throughout Selangor, wherever the treatment plant is. In the early stage, we focus on the areas that need it, such as Labohan Dagang in Kuala Langat, Sungai Rasau here in Klang, but ultimately, the system is to connect all these ponds so that we have no issue wherever the water is treated, the water can be distributed evenly throughout the state. That is our purpose, yes. Thank you.
The next question, Taman Templer. Not present. The next, Sabak.
From Sabak to Sungai Tua, my question is number 92. Thank you.
Oral Questions — Sacrificial Cattle for Eid al-AdhaQuestions
92. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the value of one cow provided by the State Government for the 2020 qurban worship, and what is the method of providing it to suppliers?
Thank you, Honourable Member for Sabak, Deputy Speaker. The question from the Honourable Member for Sabak relates to the issue or programme of Aidiladha sacrificial cows. Sabak asked about the value of the cows and so on, and also what the method of distribution is. For the Honourable Member's information, the value of the cows, as far as it was when I managed it under the Implementation Committee for the Selangor State sacrificial cow programme, this is a programme we hold every year, and it is a programme we hold to help the people of Selangor State carry out this sacrificial worship, which is an important sacrificial worship on Hari Raya Haji, yes, Hari Raya Korban. This is indeed decided every year by the MMKN Meeting, the State Government Meeting, and the EXCO Meeting, and for last year, for this year, the cow price is RM5,150.00 each. This is for this year; last year it was RM5,200.00, so it is RM50.00.00 less for this year. The process of appointing these suppliers is indeed carried out through open tender, monitored by the Committee and managed and implemented by Selangor Agricultural Development Corporation (Perbadanan Kemajuan Pertanian Selangor), which is a subsidiary of the State Government and fully responsible for implementing the open tender. This we indeed advertise in the newspapers, and we receive many applications to supply these cows, and we have criteria that we have set, decided by the Committee, including registration with SSM, having registration with a veterinarian, the Veterinary Departments, and also having its pens in the State of Selangor. That is among several matters. If its pens are outside Selangor, we do not allow it, yes. That is among the things we have done and implemented well since we tightened the system from year to year. We have received good feedback on the implementation of this project and will, InshaAllah, implement it every year. Perhaps for next year, we will consider it later. We will bring it to the EXCO Meeting to deliberate, to also include sacrificial goats as one of the options, apart from cows. That we will consider next year. Thank you.
Soalan tambahan.
Meru.
Thank you to the Honourable Mr Speaker. I want to ask the Honourable EXCO Member: like last year, ADUN-ADUN were allowed to select or view for themselves the sacrificial cows that were to be handed over, but this year, I noticed that did not happen, although there were also some ADUN-ADUN who were given the opportunity to select. So, there is a double standard there. Perhaps you can give a little explanation.
Actually no, the change is only slight compared with last year, this year and last year. That is, last year we found one cause, there was a small problem from the suppliers. When we opened it, it was too open, and some suppliers only received supply, only able to supply five (5) cows, some two (2), some three (3), and some even up to 5, 60 cows. So, we felt it was rather unbalanced, so to avoid transport costs and so on, we set the limit for each supplier at 30 cows. So, in fact, the suppliers can be chosen from, if I am not mistaken, among the 30 suppliers across Selangor, each supplier with 30 cows. In fact, the Honourable Member can choose from the places we have provided, to choose from there, unless it is already full. If there are only five (5) left, you cannot choose any more. So, for those who go early, there are indeed 30 that can be chosen by the Honourable Member, because each of the Honourable Members received, if I am not mistaken, about five (5) cows, yes? Four (4) cows, yes, four (4) cows, ok. So, this is the method we use; we want to distribute evenly. But I also received complaints about this matter, and we will review it again for next year so that the system will be further tightened to avoid such matters. Thank you.
Soalan tambahan.
Pelabuhan Klang.
Thank you, Honourable Deputy Speaker. I want to ask the Honourable Pandan Indah, can it be stipulated from now on that cattle pens that wish to supply these sacrificial cows must comply with the regulations or SOP for Waste Management, so that waste is not discharged directly into rivers. It must have waste, because we have gone to see the cattle pens, and some indeed do not comply with the standards that have been set by the Department of Environment, and certainly now must be set by the Selangor Water Management Authority (LUAS).
Yes, I am also aware of this matter, which occurs especially in livestock areas located under TKPM. This TKPM is managed by the Veterinary Department. The Veterinary Department makes it easier for us to control more, because it is indeed subject to the provisions or controls under TKPM. Under the Veterinary Department, they indeed stipulate that cattle waste must be managed properly. But outside this area, this is what becomes a bit of a problem, and in areas on river reserves we indeed do not allow or approve anything. Those that do exist are illegal; no one supplies from those, whose pens are located in river reserve areas, there are none. Only in other areas, I want to mention, private areas, so far we have not put that condition, and we may consider to
manage this so as to also maintain cleanliness and the safety of our environment. Thank you.
Soalan tambahan.
Jeram.
Thank you, Mr Speaker.
Honourable EXCO, I congratulate you, this programme can continue every year. But I see that the two (2) years before this were better in terms of the process compared with last year, because last year, yes, this year? Wait, this year, where it has been determined, for example, for each DUN where to take from. I had to deal with the entrepreneurs in my own area, where I cannot take from within Kuala Selangor, I have to take from Kuala Langat. So, how, what system is used? If in fact in the DUN, in the Parlimen Kuala Selangor, we should be able to take suppliers in our own area, if given space for us to look for them ourselves, then indirectly we would be helping the entrepreneurs in our area. So, we have to go all the way to Kuala Langat to look for them, this does not seem right. Will this system be improved next year? Thank you.
In fact, perhaps in the last moments there was an issue. The original intention, the original purpose, is indeed that we want to stipulate that all Honourable Members take from their own area or district. That is the original purpose, that is indeed its aim, because our experience two years ago was that some who lived in Sabak Bernam went to take cows in Kuala Langat. So, there are many cases like this, some even reached Hulu Langat, and there were some costs, and this year the constraints in terms of movement between districts also became an issue. The intention was indeed like that, only I feel there was a bit of a technical issue which caused some to have to take from outside at the last moment. I will ensure that this does not happen next year. We will give priority to the areas closest to the places of all those Honourable Members, which makes the movement of these cows easier. Thank you.
The Sungai Burong question has been answered together with question 27. The next question, Pelabuhan Klang.
Thank you, Honourable Deputy Speaker, the Pelabuhan Klang question is 94.
Oral Questions — Langat 2 Water Treatment Plant (LRA) ProjectQuestions
94. To ask Y.A.B. Dato' Menteri Besar:-
a)
What is the overall percentage progress of the Langat 2 water treatment plant project up to now?
b)
When will the Langat 2 water treatment plant project be fully completed? c) Can the State Government list the areas that will enjoy water supply from the Langat 2 water treatment plant?
In sequence, yes. Thank you, Honourable Pelabuhan Klang, and also Deputy Speaker. Pelabuhan Klang asked a question regarding the Langat 2 Water Treatment Plant, where the enquiry concerns its progress up to now, when it will be fully completed, and the areas that will enjoy water supply from the Langat 2 Water Treatment Plant. As of 30 September 2020, the construction of the LRA Langat 2 Treatment Plant has been completed 100%. On 21 December 2019, for this Phase 1, Stream B with a capacity of 565 million litres per day (JLH) was commissioned and began operating. However, up to now only 430 JLH can be distributed to consumers. Meanwhile, for Phase 1 there are Stream A and Stream B. Stream A, which also has a capacity of 565 JLH and is scheduled to be handed over, should have been handed over in terms of its treatment plant to Air Selangor on 30 October 2020. The overall development project of LRA Langat 2, including the construction of service reservoirs and distribution systems, has 23 packages to deliver water supply from this LRA Langat 2, but only the reticulation system is not yet fully completed. As of September 2020, the progress of work is 30.43%. The Langat 2 Scheme Water Supply Distribution System is divided into 2 corridors, namely the Northern Corridor and the Western Corridor. In terms of water distribution, Stream A and Stream B are the treatment plant, while the Northern Corridor and Western Corridor are the distribution. As of end September 2020, the progress of work for these works by distribution corridor is as follows: the Western Corridor's distribution is targeted for completion in December 2022, and for the Northern Corridor, December 2023. The overall development project of the Langat 2 LRA Scheme is scheduled to be fully completed on 31 December 2023, meaning the Northern Corridor is the last to be completed for the overall project, or the Langat 2 Phase 1 Water Treatment Plant. The areas that will receive water supply from the Langat 2 Water Treatment Plant are as follows. For Wilayah Petaling, the areas that will benefit from this water from the Langat 2 Water Treatment Plant are Puchong, Jalan Klang Lama, Petaling Jaya Selatan (PJS), Subang Jaya, Seri Kembangan and Serdang. The second group is Gombak, Setiawangsa, Desa Tun Hussein Onn, Ulu Klang and Ampang. The third is Hulu Langat, Jalan Hulu Langat and Sungai Lui, and the fourth is Kuala Lumpur, MINDEF and Keramat. That is the answer, thank you.
Deputy Speaker, may I ask: is the Langat Project counted as a water asset of the Federal Government, and after that the State Government has to pay rent or something? If so, roughly how much do we have to pay each year? Thank you.
That is indeed correct, Honourable Sungai Pelek. In fact, this project is a project under the Federal Government, placed under Aset Air Berhad. So we are actually only leasing. For Langat 2, this Langat 2 Water Treatment Plant, we indeed lease for 45 years from PAAP for us to manage the water supply. We do not own this asset, so indeed the financing is fully borne by them; we only lease it to use, that is for this Langat 2 Water Treatment Plant. That is all, thank you. I do not remember how much; later I will obtain that. It is too detailed; we will obtain the cost. Thank you.
Next question, Balakong.
Thank you, Deputy Speaker. My question is 95.
Oral Questions — Free Wi-Fi FacilitiesQuestions
95. To ask Y.A.B. Dato' Menteri Besar:-
a)
What strategy will the government adopt to develop internet access in rural areas and interior regions so as to optimise teaching and learning online?
b)
Does the government intend to provide free Wi-Fi services to educational institutions within the State of Selangor?
Thank you, Honourable Balakong. Balakong asked a question relating to free Wi-Fi facilities. Balakong wishes to know the Government's strategy to develop internet access in rural areas and interior regions, and the second part is whether it will provide this free Wi-Fi at educational institutions in the State of Selangor. For the Honourable Member's information, the implementation of digital infrastructure development in the State of Selangor is at a very interesting stage, because in line with the Smart Selangor Development, the Smart Selangor initiative that we will implement until 2025. Therefore, the need to provide a high-level internet access network, or high-speed broadband, is an obligation, something mandatory that must be implemented. Therefore, with the cooperation of the Malaysian Communications and Multimedia Commission (SKMM) and other telecommunications companies, the State of Selangor is in the process of preparing what is called the Selangor Connectivity Master Plan. I do not know the Malay translation; I searched for the word connectivity, but there is no suitable word, no word for connection. So, the Master Plan, which is a plan we are in the process of implementing and which is being prepared, will provide the Overall Development Plan for the Telecommunications Network for the whole of Selangor. This is an important plan that we will carry out from 2021 to 2025, which will provide telecommunications networks and their high-speed broadband, not only for the use of Smart Selangor but also for everyone's use, for the people and for industry in the State of Selangor. With cooperation with SKMM, because they also have a programme, the National Fiberisation and Connectivity Plan (NFCP), which has been developed with jendela (there is a word jendela that is being worked on by SKMM), and also we, with cooperation with telcos, as also mentioned by the Most Honourable Dato' Menteri Besar in his speech, including our cooperation with Telekom Malaysia, who will complete their 100% fibre network and will be fully completed at the end of 2021 or early 2022. So all of this will be integrated under the Selangor Connectivity Master Plan so that we ensure this digital gap between urban and rural residents can be reduced and narrowed, to ensure Selangor's future development is implemented in the best way. Regarding the implementation of this free Wi-Fi, indeed under the new alignment we have set 5 clusters, one of which is education. For that reason, we will also give focus to educational places in the State of Selangor, and at present we have already provided Smart Selangor Wi-Fi to the Selangor Technical Skills Development Centre (STDC), Selangor International Islamic University College (KUIS), Selangor University (UNISEL), and also libraries under the Selangor Public Library Corporation (PPAS) throughout the State of Selangor. We will further consider other educational places from time to time according to need. Thank you.
Soalan tambahan.
Sungai Panjang.
Thank you, Honourable Deputy Speaker, and thank you EXCO. Regarding free Wi-Fi, my supplementary question concerns maintenance and also the method to ensure that the Wi-Fi hotspots that already exist function, because many do not function properly. Thank you.
In fact, I have answered in the winding-up of the speech... The Honourable Member was not there, did not listen. I have explained what new steps we have taken. Among them, we have terminated the services that use this backhaul, which is from copper, or Streamyx, we have cancelled. Now our implementation of Wi-Fi, or our broadband system, is based solely on fibre, and if microwave, also with a speed of 100 megabytes per second, not less than that. We have stipulated this under the new alignment that we set 2 months ago. Now all our APs, our access points, must be with Telekom only, Telekom Malaysia with SmartSel managing our Smart Selangor Wi-Fi (WSS), and the system used is fibre, and if microwave, also if in places there is still no access yet. But the plan I mentioned earlier, by the end of the year, until the end of next year or early 2022, will be fully fibre for all places throughout Selangor, because Telekom will complete its backbone at the end of next year or early 2022, so that we can sustain or implement this high-speed broadband, 1MG, at all places, at least to be brought in. I have also mentioned our access points this year; our target is around 800-plus under construction. We will try to complete 1,100 access points. Each access point can be accessed by 30 customers at any one time, simultaneously. That means 33 thousand can access simultaneously within 1 hour. If the time is finished after 1 hour, they can log in again; it does not mean it stops, they can log in again to use it if no one else is using it. So next year we will add more to further enhance the usage of WSS, or Wi-Fi SmartSelangor, for the people of Selangor State.
The Rawang question has been answered together with question 60. The next question, Dusun Tua.
My question is number 97.
Oral Questions — Survey on KdebwmQuestions
97. Asks the Y.A.B. Dato' Menteri Besar:-
a)
What are the findings of the survey conducted by Merdeka Strategic Development Centre Sdn. Bhd. on the performance of KDEB Waste Management Sdn. Bhd. (KDEBWM)?
Thank you, Mr Speaker. The Honourable Member for Dusun Tua asks what the findings are of the survey conducted by Merdeka Strategic Development Centre Sdn. Bhd. on the performance of KDEB Waste Management Sdn. Bhd. (KDEBWM). For the information of Honourable Members, the focus of the KDEB Waste Management performance survey was to monitor the performance of the solid waste management concession in Selangor, especially KDEB Waste Management, which has taken over the entire solid waste management in the local authority areas. The findings of the study show that customers have a low level of awareness of KDEB Waste Management, but KDEB Waste Management's performance is at a satisfactory level, namely 77% overall. Four main services of KDEB Waste Management were measured, namely domestic waste collection, bulky waste collection, grass cutting and drain cleaning. The performance of domestic waste collection and grass cutting is satisfactory, with more than 70% satisfied. However, for bulky waste collection and drain cleaning, the performance is rather low, with only half satisfied, due to the rather low level of awareness of the schedule. Thank you.
Soalan tambahan.
Dusun Tua.
May I know what percentage the EXCO Member said were half satisfied, and what the causes are, if any.
"Half" means roughly 50 percent. The main meaning, and one of the main meanings, is that the public is not aware of the bulky waste collection schedule. Another reason is that the rubbish we see everywhere is not all solid waste managed by KDEB Waste Management. Most illegal dumping sites are industrial waste or construction waste, and the public cannot tell whether this falls under the jurisdiction of KDEB Waste Management or not.
Pelabuhan Kelang
Thank you, Honourable Member, Deputy Speaker. Could it be reviewed after this regarding the awarding of contracts to KDEB, this KDEB, KDEB only does collection. Cleaning or grass cutting should be handed back to the local authorities, because we see that the performance of cleaning and grass cutting is very, very disappointing, and these are the excuses of KDEB, that it is not their area, this is not their rubbish, it's difficult, it is better to return it to the local authorities. Cleaning or grass cutting, because there are far too many complaints we receive about KDEB's performance in managing cleaning and grass cutting. Can the State Government make KDEB only for domestic waste collection, and then perhaps after this it will manage factory waste, and the routine work of cleaning and grass cutting will be handed back to the local authorities?
The contract between KDEB Waste Management and the local authorities is for 7 years. After 7 years, the contract can be reviewed, and the proposal of the Honourable Member for Port Klang will be studied by the Selangor State Government after the contract ends.
Kampung Tunku
Thank you, Deputy Speaker. Earlier, the Honourable EXCO Member mentioned that the public does not know the waste collection schedule and the types of waste collected. In some local authorities, for example in Penang, there are usually signboards in housing estates with the waste collection schedule, listing the days. What is the EXCO Member's view if we in Selangor also follow this method so that the public is no longer confused? Thank you.
From my own observation, I see that there are actually signboards in many places. All places have signboards about the collection schedule, but there is a possibility that the public does not see them or does not pay attention to them. I see that signboards alone are not enough. We need to hold more comprehensive awareness campaigns, such as through social media and other ways, to further increase awareness.
Soalan tambahan
Sentosa
Thank you, Deputy Speaker. What is the State Government's action, if we are told that KDEB's performance achievement is only 77 percent, against the contractors who have given their contracts to sub-subcontractors, which is the cause of the cleaning problem or whatever we are facing now? Thank you.
Waste collection or cleaning contractors are appointed by KDEB Waste Management itself. If what the Honourable Member for Sentosa says happens, Sub, Sub, Sub, Sub, this is actually not permitted. If there are cases like this, I hope the Honourable Member for Sentosa can give information to the State Government or directly to KDEB Waste Management for further action.
Subang Jaya
Thank you, Deputy Speaker. Finally, I see Subang Jaya. Thank you, Honourable EXCO Member. Indeed, what was said, that only 50 percent are satisfied with drain cleaning and bulky waste, is true. But I want to ask whether there are efforts to monitor carefully what happens at the site, because I am not really convinced that the problem is only among the people who do not know the schedule. In the area there is bulky waste that can sit there for three weeks without being collected. So this is not a problem of not knowing the schedule, because surely during those three weeks the contractor would pass that road, but why must it wait a week, three weeks and it is still not collected. I think this matter needs to be examined. Thank you.
Yes, this is indeed a weakness, and the State Government has instructed KDEB Waste Management that supervisors must be able to monitor the contracts awarded by KDEB Waste Management. Studies like this will also be carried out in future to become a KPI, a service performance KPI for KDEB Waste Management.
Next question, Jeram.
Thank you, Deputy Speaker. My question is question 98.
Oral Questions — Lidi Land LotQuestions
98. Asks the Y.A.B. Dato' Menteri Besar:-
a)
What is the State Government's action regarding individually owned land that has been sold to buyers under the concept of selling "lot lidi" land?
b)
Can the land ownership policy be changed to a renewed lot basis with a new policy, to give the new generation an opportunity to own land?
Thank you, Speaker. I have to some extent answered this question during the winding-up in the management session or B, but I would like to explain a more detailed answer.
a) The State Government has never recognised the sale and ownership of "lot lidi" land in the State of Selangor. This is because the sale of "lot lidi" land clearly violates the express condition of the land itself, where the "lot lidi" land sold is expressly conditioned as "Agriculture", and no application has been made to change the condition or to break the boundary at the Land and District Office. The sale of land in this "lot lidi" manner creates various problems for buyers due to the absence of an individual title and the transaction is based only on a "Surat Ikatan Amanah" (Trust Deed). To curb this sale of lots continuously or rampantly without following the development conditions and title registration permitted, which will have a direct impact on buyers, the Selangor Land Administrator/District and Local Authority Coordination Meeting Bil. 1/2018, chaired by the State Secretary of Selangor on 16 Julai 2018, agreed to reject all applications for registration of Surat Ikatan Amanah for all small lots of agricultural land in the State of Selangor. This rejection applies to all District Land Offices and the Selangor Land and Mines Office until a new policy is drafted by the State Executive Council or the State Authority (PBN). However, there is no obstacle to registering this Surat Ikatan Amanah for land categories other than agricultural land. In addition, the State Government, through the Selangor State Land and Mines Office and the District and Land Office, has also carried out various briefing and information sessions for the public regarding the risks of buying land in this unrecognised "lot lidi" manner.
b) The alienation of government land through the grant of land ownership under Section 76 of the Kanun Tanah Negara is subject to eligible individuals or bodies specified under Section 43 of the Kanun Tanah Negara, including the new generation aged 18 years and above. The State Government has issued the New Policy on Government Land Ownership Grant in the State of Selangor through Circular of the Director of Selangor Land and Mines Bilangan 3/2020. Apart from applications for ownership grants submitted individually, ownership grant applications are also submitted in batches according to the prescribed conditions. All applications can be submitted to the relevant District and Land Office to be brought forward for consideration by the State Authority through the Selangor State Executive Council Meeting. Thank you.
Sijangkang
Thank you, Deputy Speaker. What role can the State Government play in terms of control and also enforcement, because I find that in my area it still happens, I do not know whether the approvals before 2018 or today are made illegally, but it happens because agricultural lands that were previously oil palm have been cleared, lot markers have been placed, and they have already started building houses, and this continues. I find that perhaps the State Government can inform us. Thank you.
Thank you, Honourable Member. On the State Government's side, the control it can exercise is to reject, as was done by the decision of PTGS or the Coordination Committee just now, the rejection of the trust deed or Surat Ikatan Amanah that was to be made at the Land and Mines Office before the subdivision of the portion is approved. So when the trust deed is rejected, it means the subsequent processes do not take place. What used to happen was that when the Ikatan Amanah could be registered, they used the document as if the State Government or the Land and Mines Office had approved the separation of those lands. That is a constraint we can impose. Secondly, I believe through complaints from the public, but some of these people are rather cunning and have been operating not recently but for a long time, and have caused losses of tens of [thousands]. Some of them were cheated because they may have offered a price that is very unreasonable compared to the market price, and secondly they offered lands that in the end did not become their property. Finally, if we report to the Police and so on, all of this falls under commercial crime, with permission, and in the end the person loses their money. The one who committed the offence may be charged and brought to court, and if there is enough evidence will go to prison, but the loss of that money is truly a continuing and very sad matter. Our control has been done by blocking that trust deed. But if there are certain reports, we can inform. However, the public themselves must know. The people themselves must understand that there are these risks if they buy at prices that are too cheap, unreasonable, and divide into lots as mentioned just now as "Lot Lidi".
Next question, Sentosa.
Thank you, Deputy Speaker. My question is No. 99.
Oral Questions — Elderly Without Financial Sources After RetirementQuestions
99. Asks the Y.A.B. Dato' Menteri Besar:-
a)
What action has been taken by the State Government to help those who are not eligible for social welfare assistance?
Deputy Speaker,
a) For the information of the Honourable Members, the Selangor State Social Welfare Department (JKMNS) has provided assistance under the Federal Financial Assistance Scheme, namely the Old Persons' Assistance (BOT), which is given to elderly persons who meet the prescribed eligibility criteria.
This BOT assistance is given at RM350.00 per month per person as a living allowance for elderly persons in the community who need help, based on the Federal Government's Poverty Line of RM960.00, with the following eligibility conditions:-
1. Aged 60 years and above; 2. No source of income to support living; and 3. No family or has family who are unable to contribute.
Meanwhile, Deputy Speaker, however, elderly persons living in institutions run by JKM, such as Rumah Sri Kenangan in Cheras, Rumah Ehsan in Kuala Kubu Baharu, or Day Care Centres, or residences that provide facilities or services free of charge, are not eligible to receive this assistance. For elderly persons who are not eligible for BOT, the elderly person can be considered to receive the General Assistance provided through the State Financial Assistance Scheme at a rate of RM350.00, RM300.00 or RM250.00 per month per person, depending on the circumstances and eligibility of the elderly person at the time. In addition, the Selangor State Government also provides the Golden Age Friendly Scheme (SMUE) for elderly persons by registering with the Selangor Child Heritage Foundation (YAWAS), which benefits them through the giving of a shopping voucher worth RM100.00 that can be used at selected supermarkets in their area according to the birth month of the SMUE member concerned, and most recently a funeral donation of RM500.00 to their family.
Soalan tambahan
Sentosa
Thank you, Deputy Speaker. Thank you, Honourable EXCO Member. Can the State Government think about or plan a programme such as a Scheme, a Pension Scheme or an Insurance Scheme, especially for private sector workers? We know government workers have pensions and so on. Many private sector workers do not have a Pension Scheme. Can we plan something so that those who will become elderly can join a programme like the TAWAS Programme, where every year we put in RM100.00, they can also contribute RM100.00, and when they reach age 60 they can get something like a Scheme, with a bit of return every year. Thank you.
Thank you, Honourable Member for Sentosa, who is very caring. Indeed, we are caring towards the community. This proposal may be noted, and we will discuss it thoroughly within the capacity of the State Government. Thank you.
Seri Setia
Thank you, Deputy Speaker. I want to ask the Honourable Member where the application for this old-age assistance is made: is it at the Social Welfare Department, or at the Central Service Centre at the EXCO Office itself, or online, how?
Thank you, Honourable Member for Seri Setia. At JKM, the Social Welfare Department.
The next question, Sabak.
My question is 100.
Oral Questions — 100. Relations Between Government Departments at the Central LevelQuestions
100. Asks the Y.A.B. Dato' Menteri Besar:-
(a) After the coup at the central level, does the EXCO still have good relations with government departments at the central level, especially those related to agriculture?
Thank you, Honourable Member for Sabak. Deputy Speaker, the question is so well written. I want to read the question and change the wording. After the coup at the Central level, does the EXCO still have good relations with government departments at the Central level, especially those related to agriculture. This is from Sabak himself, not something I added, okay.
For the information of the Honourable Member, Honourable Member for Sabak, at the level of the Standing Committee on Agriculture, Agricultural Modernisation and Agro-based Industry, we have 10 Committees under STANCO, and 9, 6 of which are from agencies and departments at GLC level and at Federal level, and that includes FAMA, Farmers' Organisation Authority, Malaysian Pineapple Industry Board, MARDI, Malaysian Fisheries Development Authority and IDA or North West Selangor, which manages the development of our paddy areas. These are all agencies and departments, or agencies from the federal level, and the departments are the Department of Agriculture, the Department of Veterinary Services, the Department of Fisheries, and our only agency is the Selangor Agricultural Development Corporation.
Alhamdulillah, as far as I am concerned, since my appointment as an EXCO Member directly involved in agriculture, I have had no problems with these Federal agencies or departments, and they have given very good cooperation, even when Pakatan Harapan was in power at the Federal level, and even now I still receive very good support and cooperation, and I hope it remains so, because we here under the Standing Committee always focus on matters that can provide support or assistance to agricultural progress, and not political agendas. Thank you.
Next question, Seri Setia.
IOI question, 101.
Oral Questions — 101. Abandoned LandQuestions
101. Asks the Y.A.B. Dato' Menteri Besar:-
(a) Is there a way to overcome the use of idle government or developer land that may be used by certain parties, which will cause problems in the future?
Thank you, Seri Setia. For the information of the Honourable Member, the State Government has instructed the Land Office to identify State land that can be disposed of by alienation, whether through ordinary alienation or open tender. In addition, for State reserved land that is still not used for the purpose it was reserved, disposal by Temporary Occupation Licence for a period of one year or Reserved Land Lease for a maximum period of 21 years may be considered for activities that support and are suitable to the surrounding land use conditions. This is to ensure that State land or State reserved land is used optimally. However, there are occasionally objections from individuals and related bodies that obstruct development on the grounds of maintaining the designated zoning of the area, even though the approval for the use of reserved land is temporary, for as long as it has not been developed for the purpose of gazettal.
As for developers' land that has caused problems, the State Government may take enforcement action under Sections 125 to 130 of the National Land Code if a breach of express condition of the land is clearly committed and the land is forfeited if prompt action to ensure remedy of the breach of condition is not carried out by the landowner. However, there are obstacles to enforcing action against titles issued before the National Land Code, or against land titles whose category and express conditions of land use are unclear. Forfeiture of title may only be carried out after paying any compensation agreed upon or determined under Section 434 of the National Land Code. Thank you.
Soalan tambahan.
Seri Setia.
Thank you, Honourable Sungai Tua. My question, as I asked the other day, concerns the land of the Railway Assets Corporation. This land is the property of the Railway Assets Corporation. Because unhealthy activities have been taking place there for several years, what is the first action the State Government itself will take? Secondly, the land is abandoned, but at the same time it involves private parties who are still in a court case, and there are also houses built illegally.
Thank you. We must return to the Land Code as the reference for looking at these land issues, as long as it is government land or titled land, as I have mentioned to some extent. If it is according to the land, the Railway Assets Corporation, that means the Railway Assets Corporation will be responsible for what happens. Let us say there are unhealthy activities, illegal waste dumping, illegal factories, pollution and so on, the State Government can issue a form called Form 8A to 7A, 7A, 8ni, 8A for seizure, 7A is for them to remedy or restore the land to its condition within a suitable time. After that, we offer or submit Form 8A, where Form 8A is the seizure of land by the Government.
However, we have to go through the process, but when it involves matters that do not show visible effects such as pollution and so on, eventually we have to give reminders to these titled landowners so that they take appropriate action, and it can be reported to the Land Office, and the Land Office, if it knows of such matters, must report them, not to the landowner, regarding unhealthy activities, or activities that are considered to endanger the surrounding conditions. Likewise, for the titled land referred to by the Honourable Member just now, which is land of the Railway Assets Corporation and land owned by individuals, the process is almost the same because it depends on who owns it. Which department owns it? Which individual owns it, which company owns it? Who is its controlling body? If it is government land, the controlling body is the State Government under the State Secretary or the agency that we designate. If the title has a grant and certain names, for reference, it belongs to the Railway Assets Corporation, and that team or agency is the one that must regulate and determine the fate of their land. Thank you.
Soalan tambahan.
Soalan tambahan.
Banting.
Thank you, Mr Speaker. Deputy Speaker. Usually government officers take a rather conservative approach or interpretation of the law, where the issuance of Notice 7A or 8A is subject to a very strict understanding of the express condition in the land title. In fact, under the National Land Code and older land titles before digitalisation, it was provided that it is the responsibility of the landowner to maintain the tidiness of their land, where they must not cause nuisance to residents and also to adjacent landowners. Only, in the land titles that exist now, that express condition has been summarised. Breach of Express Condition of Land is defined as an approximation of the conditions contained in the land title. The forth corner of the paper. Which states that if a condition is breached, such as agricultural land being used to build factories, houses and so on, that is a breach of condition, but for the rest, it is not clearly stated.
And so, for officers issuing Notice 7A or 8A, they are rather reluctant to do so. I would like to ask the Honourable Menteri Besar whether it is possible for us to take a somewhat liberal approach, or we use, ensuring that our express conditions are explained in more detail, so that landowners truly understand and know their rights and responsibilities. That is all.
Thank you, Honourable Member. I think if the matter concerned is more concise, it is better for us to interpret it, but the interpretation must be accurate and also detailed. So, after this it may be harmonised under land management or the land STANCO, looking at the issues, because we have a real issue, Honourable Member. Among our real issues is that almost 70% of our area has become urban or city areas. When entering those areas, there is a plot of land that is not looked after, which eventually creates other problems. If it is a problem to the eye, it is an eyesore, let alone problems such as infectious diseases, dengue and so on. This was a long debate before: can we trespass or can we not trespass? Can the Government enter or not enter an abandoned house? Everyone will then have objections and so on.
Therefore, I believe the Honourable Member's proposal can be taken into account. We will include it in the STANCO Meeting to look at those boundaries, because finally, when temporary title and the title that is owned, or the title of a piece of land, whatever it is owned by, and in the past it could be owned forever, not 99 years, so the Government does not have such a large space for intervening or trespassing or entering into a private space or private rights. We will take the Banting proposal into account.
Soalan tambahan.
Sijangkang.
Thank you, Deputy Speaker. In the presentation of the Economic Stimulus Package in the previous Sitting, the Government mentioned that the target of 300 acres of abandoned State government land or subsidiary companies or land that is not used, will be developed as agricultural projects, and I think that is one of the very good solutions if it can be carried out by the Government, and I would like the status up to now of the use of this abandoned land for agricultural purposes. Thank you.
Thank you. From the adjustments made by the Honourable Pandan Indah, we find that so far the figure we have is about one thousand acres, one thousand acres of State government land, land of State government subsidiary companies that can be developed or not yet developed, and there is potential that we are currently identifying. And InsyaAllah, in 2021 we can begin to increase national food production through the Food Security Programme contained in my Budget speech, and not forgetting the 3rd Stimulus Package presented in July. Thank you.
Next question, Pandamaran.
Thank you, Deputy Speaker. My question is number 102.
Oral Questions — 102. TibiQuestions
102. Asked to the Honourable Dato' Menteri Besar:-
(a) State the statistics of Tuberculosis in Selangor by district.
(b) What actions have been taken to control this disease.
Thank you, Honourable Pandamaran. Honourable Deputy Speaker. Pandamaran has asked for the statistics of Tuberculosis in Selangor by district and what actions have been taken to control Tuberculosis. For the information of the Honourable Pandamaran, the State of Selangor registered a total of 3,585 Tuberculosis cases for the year 2020. By district,
District No. of Cases Petaling 949 Hulu Langat 799 Klang 599 Gombak 583 Kuala Langat 181 Hulu Selangor 152 Kuala Selangor 135 Sepang 129 Sabak Bernam 58 TOTAL 3,585
What actions have been taken by our Ministry of Health?
i) Active case detection and screening/contact tracing are intensified when there are positive cases.
ii) Public education on the early signs of Tuberculosis and the importance of completing treatment thoroughly, because when diagnosed with TB, it takes six months.
iii) The Selangor State Government has provided a Tuberculosis incentive of RM800.00 for each patient confirmed to have Tuberculosis by a government or private medical practitioner. This incentive aims to help cover the travel costs of TB patients who travel back and forth to hospitals or clinics to obtain treatment. The allowance provided by the Selangor State Government is open to all TB patients who live in Selangor. This follows feedback we received from medical practitioners that most patients do not complete or finish treatment due to their inability to travel back and forth to Health Centres and so on. And also the Government has provided an allowance of RM250.00 through the Non-Governmental Organisation (NGO) Malaysian Association for the Prevention of Tuberculosis, also for TB patients, given through MAPTB.
Soalan tambahan.
Kota Damansara.
Thank you, Deputy Speaker. As far as I recall, we previously mentioned matters related to Tuberculosis among foreign workers. I am not sure whether this is still a challenge for the Selangor State Government. If so, what actions has the State Government taken to address the disease among foreign workers?
Alright, Honourable Kota Damansara. Our problem is that they do not come to health clinics to obtain treatment because of the cost, or they have to bear the costs set by the Ministry of Health for those who are not citizens of our country. So far, we are waiting, if they come and are diagnosed with tuberculosis, the State Government is willing to help them obtain treatment. But the problem is that we do not have names, we do not have locations, and there is no one managing these people. So far, we have clinics run by certain NGOs. And if their side refers foreign workers who already have TB, yes, and InsyaAllah we will think about what we should do next to curb tuberculosis among them. Because we know that their presence in society over a long period can be a source of tuberculosis infection. Thank you.
Soalan tambahan.
Pandamaran.
Only Pandamaran would like to ask the Honourable EXCO, whether the 3,585 registered cases are mostly citizens or non-citizens. And I have been informed that most are non-citizens; they do not dare to come to the KK or KKKM for treatment. So, if they do not come for treatment, it will spread to citizens. So what action will the State Government take if the Federal Government does not take action, thank you.
Thank you, Honourable Pandamaran. This is what I mentioned earlier, that the 3,585 registered with the Ministry of Health or the Selangor State Health Department, are those who are our citizens, yes. In fact, among the conditions we set to receive this RM800 assistance, it must be citizens, yes. We will discuss again with the Selangor State Health Department to see exactly what the actual total is, and we will coordinate again on this matter, InsyaAllah, thank you.
The question from Kota Anggerik was answered together with question no. 7. And next, the question from Kampung Tunku was answered together with question no. 47. The next question, Kota Damansara.
Kota Damansara question 105.
Oral Questions — There are floods in village areas due to development without permissionQuestions
Asked to the Honourable Dato' Menteri Besar:
a) What actions has the Government taken to resolve the problem?
Thank you, Honourable Kota Damansara, who asked about the flood issue in village areas due to development without permission. So the word here is without permission, yes. So such development has occurred in many places within my review. Whether with the departments related to floods, mainly JPS. It was found that many such situations occurred, the main cause being the problem of their internal drains, which were built not in accordance with approvals under KM, causing these drains to be unable to function in the way other water drainage works. What happens is that the invert level of this drain, when it is not, if it is not done through an application under the approval of the planning authority, of course these technical departments will comment and look at the overall implementation of the drainage system. But when it is done without permission, it means drains are built merely to channel water but without understanding how the flow of water occurs. The invert level must be correct. Or the base of the drain at the outflow must be lower than the source point where the drainage begins. But what happens is the other way round. I found that many of these things occur in places that are not developed in a planned manner. This causes water to be unable to flow, and of course flooding will occur, this is what we are studying. I have arranged several visits to the Local Authorities (PBT). So far I have visited 4, but because of these constraints, the PKPB, we had to postpone. I have visited the Klang Municipal Council, the Shah Alam City Council, the Kajang Municipal Council, another one I recall, the Ampang Jaya Municipal Council. I have visited these 4 PBTs to coordinate aspects related to flood issues.
And I found many matters that previously could not be identified, for example drains with no owner. This happened and we have succeeded in resolving them, and there are also reports that did not reach JPS. We, JPS, are the secretariat to the Selangor flood task force. However, flood reports involving PBT areas were sometimes not reported. So when I went down, only then did I receive these reports, and I informed all PBT parties to attend, especially to attend the flood task force meetings, and also to report flood issues periodically so that we can see the implementation comprehensively. Especially in villages like these, although located in PBT areas, sometimes they are outside the scope of their maintenance. And they also need assistance from the District Office. The District Office, meanwhile, has no money for implementing such projects. So I am carefully studying and looking at the best way to solve this. We cannot ignore it even though their development did not obtain planning permission, because this flood issue will cause destruction to property and hardship to our people. We will take appropriate steps needed to reduce this burden. And of course this is not something that can be resolved in a day or two, it requires time and implementation. As I will answer tomorrow in the comments regarding floods especially in Sungai Serai, which I will answer later. This involves many matters, but we are not indifferent, we will take these many constraints into account, we will try to face them and try to resolve them one by one to solve this flood problem, thank you.
Soalan tambahan
Ijok.
Thank you, Deputy Speaker. The Ijok area does indeed have a flood problem. Every village, every town, when it rains elsewhere, Ijok floods too. So what I want to ask the Honourable EXCO is, in one area, they built a drain but the problem is the completion date was late. Number two, that drain, when I look, the big drain water does not flow. Next to the town of Ijok, many surrounding communities, farmers, have come to my Office and complained. So this is about monitoring the development and construction for floods, for these drains. I hope the Selangor State Government will monitor it. When I want to contact that contractor, that is not a local contractor, when I ask to meet the engineer from the Council, he sends his technician. Because I want to get an explanation why the drain that was newly built, the water does not flow, the water is trapped inside the drain. This causes environmental health problems. Please provide an explanation.
I will look into what the Honourable Member for Ijok has mentioned. He has raised several issues here. Firstly, especially in the Ijok area, I have visited and seen it many times. There are two main causes. Mainly, it is the low-lying areas and most of what is called the drain here, which was built. Its term is borrow pit. A borrow pit functions as a retention pond, actually. It looks like a drain, but it is actually a retention pond. And its water needs to be pumped into the river. These are among the things that happen in low-lying areas, including what I visited at Sungai Langat here, in the Sungai Serai area, at Sungai Betong and also at Batu 10 at that time. Most of these areas are low-lying. Even if they build drains, the water cannot flow into the river unless there is a pump system. That is why we are developing a pump system and also the borrow pits I mentioned earlier to hold back the water.
The second is maintenance, the maintenance of our drains. We do not have the capacity to maintain them every two months or three months. That is because of the high cost. And another thing I want to inform you of here, especially in these rural areas, is that they increase their planting and use fertiliser. This fertiliser flows into the river, and the plants grow quickly. Sometimes when we carry out work, that is why I have already told the Drainage and Irrigation Department (JPS), for example, for drain maintenance, if possible, push it closer to the end of August or September, near the rainy season, the monsoon, for what reason? That helps in terms of water flow, because the plants only grow briefly. If we do it early in May or April, they will grow within two months and the drain will be full of vegetation. So they are not able, with financial constraints, to do it many times. These are among the things we have already included in our schedule to ensure this. These are some of the matters I mentioned earlier that have become issues. But I am not looking for excuses not to answer, yes. I am saying there are issues, but we will look for the best method on how we can resolve them, and it will take time. And sometimes it also involves the PBT. They have their own scope, and not all flood issues are under the responsibility of JPS. Earlier, he said it is under the task force, yes, but it also requires cooperation from the PBT and the District Office to resolve it. Thank you.
Sungai Pelek.
Mr Deputy Speaker, I take this opportunity to ask for help from the EXCO. In the DUN Sungai Pelek area, we are an agricultural area. So there are many rivers that have long not been managed by JPS and so on, and they often flood. So, could it be that sometimes
landowners or farmers cannot wait for JPS's budget, and they request to do the work at their own cost. So I ask the EXCO to grant permission through JPS to farmers or landowners who are willing to carry out that work at their own expense.
For now, that is fine. We can consider it if the land is in their own area, yes. For them to manage that, we have no problem, but if possible, let us hold a discussion first so that we can present to them the specifications, so that the work they do will not cause greater difficulties for others later. So we want to look at the whole picture, because this flood issue does not involve just one person, yes. It involves many people, so that the implementation specifications can be arranged properly.
I understand, but I raised this issue because it has been dragging on, it has been a very long time, yet it still has not been resolved in the DUN Sungai Pelek area.
Deputy Speaker, one question.
Yes, Kota Damansara.
Okay, I listened carefully to the answer the EXCO gave, that we must focus on these unauthorised drains. In Kampung Melayu Subang, we have the Pelepas Sungai Pelepas project. There is one lot, Lot 3424 Jalan Merbau, which may be the main cause of the flooding in the Kampung Melayu Subang area. I hope the Honourable State Government can focus on that lot, yes.
Yes, that is quite specific. I will take note of what the Honourable Member for Kota Damansara has said. One more thing I want to mention is this drainage system in areas developed without approval. I have looked into several, among them in Subang Jaya, there is one that is not a village area but an area developed not in accordance with the Jalan Subang area. When I was a Councillor, I conducted a study and found that the network drainage system was built in a rather haphazard manner, and the cost just to rectify that area is RM8 million, RM8 million. Why this drainage system does not follow the correct method, the water does not flow. So when we want to rectify all these drains, they are interconnected. There cannot be separation between these drains for the water to flow. So the cost alone to build it is RM8 million. So I am confident that if any, if it involves correcting the invert levels of these drains, that action is not a simple and cheap matter. And we will look at other methods, there may be retention ponds. That also requires land to store the water first before we can channel it. That may be one method that we
need to look at. If we want to rectify these drains, I am confident the cost is very, very high. But we will look at it, yes, case by case, let us see how it goes.
Alright, thank you, the Honourable Member for Pandan Indah. Honourable Members all, the time has reached 11.30 am, so I hereby adjourn the question session for the next business.
Continuation of Motion No. 16 of 2020, Motion on Development Allocation 2021Motion
Next order of the meeting, continuation of Motion No. 16 of 2020, Development Allocation Motion 2021.
Yes, I invite the Honourable Member for Dusun Tua. Before the Honourable Member for Dusun Tua continues the debate, I wish to inform all Honourable Members who wish to take part in the debate on this Development Allocation Motion that I am only giving 5 minutes, please proceed.
Thank you, Mr Speaker, so continuing from yesterday. As I have explained, there are two areas that really should be given attention regarding the flood issue in the Hulu Langat area. The first is Kampung Sungai Serai and the second is Kampung Batu 10. And for both of these, I have not yet seen any allocation in the budget for this year, even though we know that at Batu 10 what is most needed is an automated pump house and Ban to help pump out the water. This is what JPS has informed us needs to be done for the short term. Meanwhile, at Sungai Serai, JPS has also informed us that it needs a retention pond. These are short-term plans that we should be able to help with, and I hope the State can help, and further under VOT P13, under Project Code P.K 5, and I see that under the management of Environmentally Friendly Drainage, many upgraded ponds maintained by JPS, I see the list has a few. However, I would also like to ask the Government how we are going to resolve the problem of retention ponds located in residential areas. I am sure there are many in Kajang because it is under the Majlis Perbandaran Kajang, there are many, and elsewhere there may also be many, and these ponds should actually be maintained by JPS, but until today their situation remains hanging. It is like a marriage left hanging without a bond, a marriage without a bond, it is like something hanging without being tied. No one knows whose it is. The residents of the taman cannot look after it, JPS says it is not theirs, the PBT Council says it is not theirs, the developer has completely forgotten the story. So how will the government resolve this problem, so that the maintenance can be given to the parties who are truly capable and who should be responsible. Because if it is left unattended like this, the pond will remain without an owner forever. If luck is on our side, it is maintained with help from residents to clean it, but most of them are abandoned and eventually bring many more problems that we do not want. I also want to touch on VOT P01, we jump back to P.K 16, I see many development projects for water supply. I would also like to ask the
Government about the water issue in Sungai Lui. Indeed, looking at some of the pipe projects that have started heading towards Tekali, some have started heading to Batu 18, which we appreciate, but we also want to know about Sungai Lui. It often experiences the problem of no water caused by water pressure. This is what we usually tell them. But we also want to know what solution is planned or will be carried out, because this too we do not see in any part of the budget. And finally, I want to touch on VOT P12, under P.K 1, where various road development programmes are. Here there is about installing lights in the Hulu Langat District. On this, I strongly agree and am interested in the proposal by Pelabuhan Klang about installing solar lights just now. I think it is time we began to look towards developing solar lights and no longer rely on cable lights. Especially in areas that are rather remote, where it may be difficult for wires and so on to reach. I give an example in the Sungai Tekali area, in the DUN Dusun Tua. I myself have taken the initiative, with such limited allocation, to install solar lights to ensure the village roads are bright. We have had to do this even with a small allocation, and we should expect that this is the government doing this, even though there are difficulties, there must be a solution. So I hope there are efforts in this direction, and perhaps the State Government should consider moving towards using solar lights, not only in Pelabuhan Klang. Pelabuhan Klang gets all sorts of things, I hope throughout the State of Selangor, if possible, we begin to use these solar lights. So that is all I wished to bring, thank you.
I will give it to Sijangkang first.
Thank you, Mr Speaker, for giving me the opportunity to debate development expenditure. There are perhaps several matters I wish to raise. Firstly, it relates to P.K 1 concerning Industry and Investment. Whether we like it or not, we can say that the State of Selangor is an advanced state, and yesterday we also passed the gazettement of the Majlis Perbandaran Kuala Langat, and some of the issues that happened previously, which the people of Kuala Langat raised and I brought into this sitting, relate to industry. I see that although the State Government has clustered development, including investment or industry in this State of Selangor, several issues raised have ultimately produced an outcome which I think development should not reject, but this development must be viewed from the perspective of its impact on the environment. Beginning with the issue of the plastic recycling industry cluster, then the battery factory, and today the paper mill, I think this must be looked at, and I see that the factories developing in Kuala Langat need a lot of water. What I think today is that Selangor has a very good road connectivity situation. Moreover, when the WCE or Lebuh Raya Pantai Barat is completed, it will connect the easiest connection from North to South in this State of Selangor. And I
hope there is a form of sustainable development in every district. Perhaps industry should not be concentrated only in Kuala Langat, and yesterday it was also mentioned by Hulu Kelang that our wealth does not depend only on the strength of development and economy, but all the components of that district have their own wealth, including forests. That is why I feel that the Kuala Langat Forest Reserve must continue to be preserved and must be viewed from the perspective that in the end it must not cause our environment to be affected. The second is that I take this opportunity to look at P.K 4 Social concerning Development, especially Orang Asli Affairs. Kuala Langat is among the areas with many Orang Asli villages, not only in the State of Selangor but also in our country, and also a very large population. With an allocation of RM500 thousand provided for next year, I think it is a very small allocation. What is the harm if we take a somewhat larger allocation than that to develop these Orang Asli Affairs. We are well aware there is the Department of Orang Asli Development (JAKOA), but I think the role of Selangor, if it can play it, can bring very good benefits, especially for social and also education. I take this opportunity to congratulate an Orang Asli student from Kampung Judah named Nur Sazunisa Anjang who recently received an offer to enter an Institution of Higher Learning (IPT). So I think this is a good achievement. It means that if we are determined, then we can actually develop these Orang Asli people. If we look today, by rough observation, I am far behind in terms of their education. It means they too are capable of us developing them in terms of education. The third matter is concerning P.K 9 Municipal, concerning Solid Waste Management, for which RM5.6 million is allocated, and I think this may be the allocation provided for domestic waste management in the rural areas or in the villages. Especially for several councils, formerly the Kuala Langat District Council, Kuala Selangor, Sabak Bernam and Hulu Selangor. And I think among the various complaints, and we are also aware, the issue of domestic waste disposal has become an issue without a solution. In my view, it is constantly moved to a new place and becomes a dumping ground, not only for domestic waste but all sorts of things, and in the end part of the domestic waste is also burned, and there are responses saying that they are unable to collect or resolve it thoroughly. Among the reasons is the small allocation. Perhaps it is only collected about once a week, but the volume of the dumping is very large. I hope there is a larger allocation than this so that in the end it does not become slander, the issue of waste solutions in those areas themselves. The next matter I want to mention relates to Libraries. In P.K 14, 14014 Special Allocation for the Taman Seri Medan Library, Kuala Langat, which I think the development of the Taman Seri Medan Library is an allocation that was previously under the State Library of Selangor, where there were two pilot projects, namely in Seri Setia and also in Kuala Langat. I recall Seri Setia is already completed, already built, already beautiful. But Kuala Langat, it seems
is still not completed, and I recall that during my time as part of the State Government, up until today, it has been at least more than two years and it is still not completed. I have been informed that the development processes are still not completed from ..
Honourable Member, please wrap up.
Please be brief. So I hope this can be acted upon thoroughly. Then, regarding the Peduli Rakyat issue, thank you to the State Government for restoring the RM500 contribution under the Skim Usia Emas, and we have had a fairly long experience. Among the few issues that were raised, I recall the issue of misappropriation of the RM1,000.00 payment previously. This becomes a lesson for us, and I hope the ultimate goal is that the cash reaches the family of the deceased so that the funeral arrangements can be settled and there is no misappropriation. I would like to express my thanks to the State Government for recently returning, I did not expect it either, but I received a few thousand from the excess money I had spent earlier, which I was forced to, usually we put it first, and give it to the family of the deceased themselves. And finally, I ask that the State Government look at one road, Jalan Nangka in Kampung Medan, my area. It has a road reserve, but within the road reserve there is also, I don't know whether it is a borrow pit as mentioned by Pandan Indah, but the drain is quite large and channels water runoff from the housing estate. However, both drains are not straight, they curve away from the plan provided by the Public Works Department (JKR). So that road is the main road for students going to secondary school or across the federal road. So I was informed that the JKR can help to widen that road, but the drain issue, it has taken up most of the reserve, and I hope perhaps this drain can be upgraded and this road can also be widened or its alignment corrected, this road can be widened. So I thank you, Mr Speaker.
Meru.
Yes, thank you to the Honourable Speaker. Thank you for giving me the opportunity to debate regarding the Development Budget for 2021. I will summarise that P.01, Office of the Menteri Besar, Project Code 07002, Upgrading of Sports Infrastructure. Given that sports facilities are very lacking in Meru, I request to carry out repairs in several areas, particularly the football fields which are very dilapidated, especially at Taman Meru 4, and also the football field at Pekan Kapar as a recreational place, and also at the Public Works Department (JKR) land in Pekan Meru, which at this time is not maintained so that it can become a recreational place, and also to repair several futsal courts, which, as far as my records show, have never had any repairs carried out, especially on Jalan Hamzah, Kampung Budiman, which needs immediate repair.
And this is very important, if we look at Meru itself, in fact many athletes have been born there, and not only in the field of sports, which I am referring to, but also in the field of motorsports. There are athletes from Meru who have reached the international level, which the state may not be aware of, but I can inform you that we have a good track that can be developed. Project Code 13004, Malay Customs, Language, Arts, Culture and Heritage Education, page 199. I would like to state here how important it is for our people to know history and for Selangor citizens to be exposed to the history, customs and culture of Selangor, especially to students, civil servants, and also to representatives of the people so that they understand better and develop a sense of love for the State.
And as we are well aware, in this House not everyone was born in the State of Selangor, so when we become representatives of the people in the State of Selangor, we should understand the history and also the needs of that state itself, so that we do not create new history or damage existing history. Honouring the contributions and the earlier fighters in the State of Selangor. If we look at recently how a road in Kuala Lumpur, Jalan Raja Laut, although part of the road has been renamed Palestin, although it is to appreciate the country of Palestine, that is another part, but to me this matter, little by little, will erase the names of great figures in the State of Selangor itself, which we must all appreciate. There are many more white people's road names that we could change, but why change the names of the figures of Selangor itself, which we fear will erase these great names from the annals of Malaysian history itself. As an example too, how many of us know that Lukut, Negeri Sembilan, was actually originally under the administration of the State of Selangor. There is a history of how it was separated, it is also connected with Semenyih, I think there is no need to resolve it here. Semenyih was originally Negeri Sembilan, Negeri Sembilan. Lukut was originally Selangor, there was tin ore there, tin ore there, but there was political conflict and so on.
Perhaps in the old days there was also Perikatan Nasional, we do not know what caused the conflict that occurred. Do not stare like that, it is dangerous. Yes, what causes many of us not to know history is because we have never been given attention to these histories themselves. And also regarding strengthening the gallery, what, the Royal Gallery Museum in Klang, many of us do not know about it. I am confident that in this House, the Honourable Members have never even been there. The Royal Gallery Museum, there is a lot of history there that we can learn, interesting things we can see, that we can share together to pass on to the younger generation so that they know about history, so that a sense of love for our state arises. Code 14005 – new library in Klang, page 200. I would like to state, I fully support the construction of this library, only I am not sure where. I would just like to take this opportunity for the government to also look at the library in Meru, which is very dilapidated, which only shelters in the MPK Hall in Pekan Meru, which I observed is not managed well and needs repairs and also upgrading so that it can attract many more people to together enliven, enliven that library.
Okay, P.12 JKR, Project Code: 1301302, improving road safety aspects in the district of Klang, page 219. Given that there are many junctions in Meru, several hotspots frequently have accidents, among them Jalan Kopi, Jalan Nanas and Jalan Jambu. I propose that these roads be provided with speed bumps to reduce accidents, and that warning signboards and divider signboards be installed, especially in front of Masjid Asy-Syarif in Pekan Meru, where many accidents occur because there are no signboards there. Then, at night it is also not very clear, which makes accidents easy to occur. Project Code: 0304300, page 225. Given that Meru has become an industrial area, road damage frequently occurs and roads are very easily damaged even after being repaired, because they are traversed by heavy lorries. I propose that several main roads be upgraded urgently, especially Jalan Manan, from Klang Sentral to Aman Perdana, which is the responsibility of the state JKR. Persiaran Hamzah Alang, which is under the responsibility of the federal JKR, also urgently needs repair. The state government needs to find a temporary solution to be repaired before the federal JKR or central JKR carries out its responsibilities. And I am somewhat disappointed that when I look at the 2021 budget, Meru has no allocation at all for road upgrading.
Although Jalan Manan, which I mentioned earlier, was repaired, that repair did not last long because it was not upgraded, only ordinary patching, which caused it to be damaged in less than a week. And some proposals need to be considered to overcome related problems too, where stricter enforcement is needed against activities that encroach on road reserves and drains, such as commercial businesses and stalls that also dump rubbish into the drainage system and obstruct maintenance work by the JKR and also related agencies and also the Drainage and Irrigation Department (JPS). I also seek approval for the upgrading project of Jalan Missing Link, Klang Sentral, Meru, Kapar via Hamzah Alang. There are also issues of overlapping drainage maintenance between agencies such as JPS, JKR and the Local Authority (PBT), which cause many problems and hamper the repair and maintenance process, and I feel these agencies need to meet frequently to carry out repairs so that, what is it called, so that such undesirable things do not happen.
Meru.
A little more, just a little more.
No more incidents, okay. The last number.
A little more, a little more, and also something that may be said to be rarely formed, rarely touched upon, relating to veterinary matters. P.17, Project Code: 04001, Masyarakat Prihatin Haiwan and Code 05002 – Kebajikan Haiwan. This relates to stray cattle. I also do not know which code to use, Masyarakat Prihatin Haiwan or Kebajikan Haiwan, okay. In the town of Kapar, Sementa can confirm that it is indeed an area where these stray cattle roam. And also in Aman Perdana, there seems to be no action. I propose, perhaps this proposal, perhaps the authorities can consider it, whether it is funny or not, I apologise.
These abandoned cattle, although I know their habitat is quite far away in Olak Lempit, that is one of the problems, there in Banting, far. So perhaps the local authority (PBT) can round them up. Then give a period to, what is it called, the public or the owners to claim them back, if within certain periods they do not claim them, the cattle are sold and the sale proceeds are returned to the state government or the PBT. I think when there is action like this, the trader, eh, the breeder, will become more sensitive and will take care that their cattle do not roam outside. Because this matter is very important, we are afraid it will endanger road users too. This is something very important and also needs to be refined. I thank you. Although five (5) minutes is really not enough, there is much more, but that is all I had time to convey, thank you. I fully support the 2021 Development presentation tabled by Y.A.B. Dato’ Menteri Besar.
Alright, Meru, on the stray cattle. We will ask Rawang first.
Thank you to Mr Speaker who gave the opportunity to debate. I will go straight to a few points because of the short time. Three (3) matters that I have to highlight. The first concerns air pollution. As in this sitting of the House, we are always debating matters such as water that smells, but I think we need to give attention to pollution issues apart from water and also issues of pollution relating to air. We know that existing factories operate 24 hours, but we pay too little attention to those factories that cause air pollution, especially at night, when residents are sleeping. In my area too there are several places, residential areas close to manufacturing, which is why complaints are high. So, I hope the government can give attention to this matter to strengthen enforcement and whatever technology that can help, help in terms of enforcement.
The second concerns community halls. Last year I also raised this issue. In my area there are indeed places with new development, especially in the Kota Emerald area, at Country Home, only in that area there is not a single community hall under the PBT or the government. So, I hope the government can take attention to this matter. The third concerns sports. As we know, in these two (2) years, I and the State Assembly Members (ADUN) have received letters regarding upgrading existing fields, but every time we receive a letter, we propose again which areas need to be upgraded, but even after two (2) years we do not see any progress on that allocation. When I asked the Land Office, they said the allocation has not been released. So, I want to get certainty from the government on this issue, and I also hope that more allocation can be released to upgrade and also build sports facilities for existing youths. Here also, I, because of my neighbour, Taman Templer, because she is now in quarantine due to having close contact with, with what is it called, a positive patient. Taman Templer has two (2) neighbours, one Sungai Tua and one Rawang, she would not ask Sungai Tua to raise her issues, so I was given the opportunity to raise issues for Taman Templer. She has six (6) matters, which I would like to help her raise.
The first is the land acquisition for upgrading Sungai Udang, where flooding frequently occurs. The second is the widening and upgrading of the Kuala Lumpur to Rawang road, especially the uphill section at Taman Amansiara, a proposal for peak hours, take one lane from the opposing traffic to add a lane to the congested lane. The third is to upgrade the Taman Dataran Templer park in Bandar Baru Selayang for recreation and also jogging. The fourth is to build a pedestrian overpass on the Kuala Lumpur to Rawang road, in an area near the Institut Kraf Negara in Taman Templer. The fifth is the status of construction of Masjid Selayang Mutiara, Masjid Selayang Pandang and upgrading of Surau Al-Furqan in Bandar Baru Selayang. The last one is to build the Gombak Syariah Lower Court so that it can operate. So, those are some matters from Rawang and Taman Templer, so I hope to get an answer after this. Finally, I also support this development motion. That is all, thank you.
Balakong.
Thank you, Mr Speaker. I would like to debate matters relating to page 198, Project Code PK 505003 – School Assistance Project. Under this project, a total of RM26 million has been planned to assist the infrastructure development of schools, especially SJK(C), SJK(T) and SAR. Congratulations to the government, as this allocation really shows the government's concern for the education system in this state. We all understand here that SJK(C), SJK(T) and SAR really need financial assistance to repair and improve their school infrastructure so that our children can be educated safely and comfortably. What I would like to get clarification from the government on is, why is phase I of the school assistance, this year, still not yet distributed? Yet the Honourable Member for Pandamaran raised this issue at the previous sitting of the House and received an answer that the allocation would be distributed in July or August.
For the information of the Honourable Members, phase II of the school assistance was opened for applications on the 1st of last month and the applications were closed on the 16th of last month as well. It is rather unfortunate that while the application period for phase II has already closed, the allocation for phase I has not yet been distributed. How can schools make applications and better plans for phase II when the phase I allocation has not even been distributed? Therefore, I sincerely hope the government can distribute the allocation as soon as possible and also extend the application period for school assistance phase II so that schools can make better use of this allocation and also draw up a more careful plan for the phase II application. I would also like to debate matters relating to page 257, Project Code: PK 404001 – Caring Society for Animals, and the same page, Project Code: PK 505002 – Animal Welfare.
I will debate these two together. According to a report from the Malaysian Animal Association on the 20th of April, the abandonment of pet animals, such as dogs and cats, increased three (3) times around Kuala Lumpur during the Movement Control Order (PKP). Although this report refers to the area around Kuala Lumpur, I would like to remind the Honourable Members here that it is Selangor, around Kuala Lumpur. The way the local government manages stray or abandoned animals has always been an issue that is criticised or condemned by the public. I believe that educating the public to respect every life must be prioritised, because many stray or abandoned animals are pets that were dumped by irresponsible parties. Many also bring their pets to animal centres or animal shelters, with permission, whenever they do not want to keep those animals. This worsens the situation at animal shelters, because their owners are unable to cope with the increasing financial constraints, whereas the actual function of these shelters is as a place to rescue injured stray animals, which are housed temporarily for treatment and then released again.
I fully understand that during the COVID-19 pandemic, the government's financial situation may not be very good, and the government will focus more on the welfare of the people of Selangor compared with animal welfare. However, as I have debated before, when I debated last year on the same topic, "how we treat animals reflex humanity", with permission. I really, really hope the government will take this matter seriously. In the Budget for the year 2020, under the same project code, namely animal welfare, the government had planned RM40,000 to carry out related programmes, but in next year's budget there is no allocation for this year. Only RM20,000 has been planned to carry out programmes for a caring society for animals.
I request clarification from the government on how this RM20,000 can carry out programmes effectively to educate the very large population of Selangor to build a caring society for animals? If the government truly cannot provide a better allocation, a larger one, for this matter, is the government intending to cooperate with NGOs in the state? Such as Furry Tails Land Shelter, with permission, or Sahabat Kucing Jalanan, Yayasan Kebajikan Haiwan Kebangsaan Malaysia and others, to find a way to obtain a more humane solution. With this, I request to support this Motion. Thank you.
Tuan Speaker.
Lembah Jaya.
Thank you, I would like to thank Mr Speaker. Lembah Jaya would like to raise several matters under the Development Expenditure Estimates 2021 Motion, page 198, object code PK9 – Public Amenities Municipal Details of Local Authorities. Lembah Jaya would like to propose that recreational facilities be increased, especially in areas near low-cost flats or low-cost apartments, because it was found that during the development of these flats, this matter was compromised, leaving only pocket land, with permission, for recreational sites. And also carry out or implement attractive landscaping so that small areas can also create a cheerful atmosphere and be pleasing to the eye.
The matter that, one more thing relating to public amenities of local authorities. Lembah Jaya also would like to propose the creation of a green network, where this green network connects all the recreational sites in the surrounding area so that it can be accessed or visited easily, whether by vehicle, of course, but perhaps with fewer pedestrian paths and also paths for cycling, because we see the trend recently, many people have, what do you call it, become fond of cycling activities. So with a green network, especially in urban areas, it will give families in the city the opportunity to take recreation together with their families at weekends. Solid Waste Management Details PK09004. Lembah Jaya would like to propose that workshops on awareness related to waste separation efforts be increased or improved. So far we are only trying to clean up areas that have been dumped with rubbish, or illegal sites that have been piled with rubbish. Only the prevention, the prevention method, needs to be improved by holding more workshops, or workshops, with permission, on how this rubbish can be converted into money or give financial returns. I do see that there is, but it is not very aggressively carried out. So this matter needs to be improved.
Next is the Motion to separate the rubbish, because this is the government's aspiration to see us as a society that reduces the disposal of rubbish and also reduces the existing landfill sites. By separating rubbish, we are able to recycle items that can be recycled and earn money from those items. And the second point, we will reduce the dumping of rubbish at landfill sites.
The next matter under PK14, under the details of Libraries – Upgrading District Libraries. For information, when the SUKE Sungai Besi – Ulu Klang Elevated Expressway Project was implemented, a Selangor Public Library located along the SUKE alignment was demolished. So today, Lembah Jaya would like to know when the construction of the replacement for the Selangor Public Library that was demolished will begin? Because it was found that the location has been identified, but efforts to restore or rebuild it have not yet been seen.
Next, page 209, code P08 under Project Code PK1 – Permanent Food Production Park Development Details. Lembah Jaya is very interested in the government's efforts to be self-reliant in terms of providing food sources with adequate food supplies. With a population of 6.5 million, competition for land in the State of Selangor is well known to be very intense, yet much of the food needs in this State of Selangor must be ensured not to depend too much on outside parties. So with the lands that have been identified in the TKPM list, has this met the state government's target in terms of having adequate food supplies? If not, what is the percentage of the target identified for existing projects for the year 2021? And how can the use of modern agriculture improve output, as well as the diversity of crops needed and subsequently sustainability?
Next, page 215 under Project Code PK4 – Social Forestry Programme. For the information of this esteemed House, within the Lembah Jaya area there is a forest that we call Bukit Kembara Forest Reserve in the Ampang area. This area has actually become an attraction for many enthusiasts and hill climbers around Ampang and also Kuala Lumpur. And it has become the choice of many hill climbers, although it is not officially publicised, but it has become the choice of hikers, with permission. However, their arrival was found to be trespassing on the Forestry Department's area because the Forestry Department does not allow any visitors or hill climbers to enter the reserve area. Lembah Jaya only proposes that the Forestry Department open or give the public the opportunity to use or enjoy the Bukit Kembara Forest Reserve area, because this will create a sense of love and affection for the natural environment. And also create awareness to protect and, what is appreciate, with permission, this natural environment.
Honourable Member, the last one.
There is a little more.
The last one, the last one.
I request Mr Speaker because this is very important. There is another area, namely Ampang Look Out Point, which was closed in 2012 because there was ground movement that caused cracks in the buildings at the site. And this area has remained closed until now. However, it has deprived many enthusiasts who visit Bukit Ampang of enjoying the beautiful view at sunset. So I understand the Forestry Department has been tasked with restoring A-LOOP, Ampang Look Out Point. But until now no developments have been seen, because Lembah Jaya found that another site that was created illegally has caused many safety issues as well as in terms of cleanliness. So the most serious or critical issue is safety, because there is another site opened illegally on the slope of Bukit Ampang. But it has become a destination for many people every weekend and at night. The road becomes congested even though the area is not lit with lights, but it has become a place visited by many people. So this is an issue that I see has been prolonged. I really, really hope the Forestry Department can reopen Ampang Look Out Point and give visitors the opportunity to enjoy the beautiful view. If you and you all, ladies and gentlemen,
Cukuplah.
Search on the Internet, you will find that this area has become a tourist attraction both domestically and abroad.
Stop. Enough, enough, enough.
Akhir sekali
Enough, enough, enough.
Finally, I request.
You have been given far too much already. Enough.
Just a moment, just one minute. Finally, it concerns the Flood Mitigation Project. Page 237, Project Code PK3 – Details of Stabilisation and Strengthening of River Banks in Hulu Langat District, Various Districts. Lembah Jaya would like to raise the issue of the Sungai Ampang, which has been filled with silt due to the construction of the EKVE, another expressway, within the Lembah Jaya area, and this has caused a risk of flooding every time it rains. So I request that the Irrigation and Drainage Department ensure that the Sungai Ampang, from Taman Rimba Ampang to Ampang Waterfront 3, has its banks strengthened and the river deepened. That is all. Lembah Jaya supports the Development Motion 2021.
Ijok.
Thank you, Mr Speaker. Ijok will touch on matters that are relevant because many matters have been raised by fellow Honourable Members in this House. I want to comment on the spread of COVID-19. The question is, when will it end? Maybe at the end of the year, maybe mid-year, maybe two or three years from now. So what Ijok wants to emphasise is that the state funds should be used, prioritised for places that are needed by the community in Selangor. What? Health, welfare, education, because this has affected the community in the State of Selangor in these fields. What Ijok wants to comment on is because the health allocation, namely 56 million. In Ijok's opinion this is not enough because we will not know when the COVID-19 pandemic will end. Ijok wants to refer to the allocation on page 198, PK7 Football Development, 10 million. Page 201, PK18 under National Awareness, 10 million and also page 201 PK19 Miscellaneous (Code 19001), 44 million. If we add all of these, it is more than 50 million. Ijok wants to ask the Government, I am not an opposition member, I want to get an explanation, please review these allocations, we can channel them to areas with allocations that are really needed by the community during the COVID-19 outbreak because for the PK19 code, miscellaneous, 44 million, I hope the State Government of Selangor please explain, describe what its use is, its need? It's urgent? At this time, when we want to use all the funds we have for our community. Okay, that is what Ijok wants to comment on a little, if possible the State Government of Selangor should look at all of these allocations. This is what Ijok wants to comment on regarding the area, the Public Works Department, page 226 Project Code PK404700 Road Upgrading. I am puzzled why in Kuala Selangor many roads have been repaired but the road upgrading development allocation in Ijok is empty. It should be given a little, because the roads in the Ijok area are village roads, roads that are always damaged. I have already raised the matter of the road from Ijok to Batang Berjuntai, but why are the other road upgrades empty. Other places in Kuala Selangor have been done, but I hope you will not forget the roads in the Ijok State Constituency. Another thing I want to refer to is the Selangor State Irrigation and Drainage Department. Page 230 PK1 Development of Flood Mitigation Projects. I have raised this earlier, Ijok, every village must face flood problems. When it rains in Gombak, Ijok floods, so I find that the development allocation PK101402 in Ijok is empty, this is already two years in a row. Is Ijok PJS, or is this Selangor State treated as a stepchild, let the floods happen. This is what Ijok wants to ask or request, beg the State Government of Selangor, please look at the Ijok area. Ijok thanks the State of Selangor, the Kampung Jaya Setia area, at last there is an allocation to fix the flood problem. That is all, thank you Mr Speaker.
Bandar Utama.
Thank you, Mr Speaker. Bandar Utama will not speak at length, only raise one important matter. Referring to page 231, Vote P13, Project Code: PK101303, which is also related to the Damansara Tributary Flood Mitigation Project, because the river at Kampung Ara is located below the Sungai Damansara, so Bandar Utama only wishes to ask for clarification on the status of the Kayu Ara River Flood Mitigation Development, which has not yet been carried out and is estimated to be carried out next year. So there are several matters on which Bandar Utama would like an explanation. Firstly, is the allocation for the flood mitigation project involving the Kayu Ara River Flood Mitigation Project included in the 2021 funds? Is there any increase in cost or allocation for the Kayu Ara River flood mitigation project? Because as far as Bandar Utama knows, please correct me if I am wrong: the Kayu Ara River Flood Mitigation Project has already been approved, and the funds allocated and used were the funds allocated in 2020. So I would like to ask for clarification of the current status of the Kayu Ara Flood Mitigation Project. Another matter I wish to raise is that, according to the schedule given by the Department of Irrigation and Drainage (JPS), this project will take several years, so my estimate is that if this project is completed or finished, it may be in 2022 or 2023. So Bandar Utama wishes to raise this: if flood issues occur during these few years, will the State Government take proactive steps to carry out small projects to contain this problem? Every time there is a flood at Sungai Kayu Ara, it affects several places, including SS4, Kampung Cempaka, and sometimes Kampung Kayu Ara. So whenever I go down to the ground and meet residents, each time a flood occurs it is quite difficult for me to tell the residents that we are waiting for a project that will only be completed in a period of several years. That means they will have to face difficulties or hardships for these next few years. So every time there is a flood, they will be affected. So Bandar Utama hopes to know, firstly, the status of the Flood Mitigation Project at Sungai Kayu Ara, and secondly, if the State Government
has any plans for the short term or in the interim while waiting for this project to be completed. Bandar Utama also hopes that state funds can be focused on development that cannot be postponed, the most important being floods, pollution, pipe upgrading and so on, because these will affect the quality of life of residents in the DUN Bandar Utama and also the people of Selangor. So I ask the Government to take note of these matters and issues, and it is hoped that you can also provide feedback, reports or the latest update, with permission, on the Flood Mitigation Project in the Kampung Kayu Ara tributary. If possible, please increase the cost for this project, because the last time I discussed it with JPS, this project may need more funds. That is all Bandar Utama wishes to raise, and with this I support the Motion on Development Allocation 2021. Thank you.
Kota Damansara.
Thank you, Mr Speaker, for allowing Kota Damansara to debate. I thank the State Government because, according to this budget, on page 248, PK3, there is mention of the Kota Damansara Mosque and the Subang Bestari Mosque. Thank you, State Government, for listing these mosques, and according to the State Government's answer, these mosques will be completed in 2022. So Kota Damansara hopes that in the next budget it will be mentioned in the budget speech that the Kota Damansara 2 Mosque and the Subang Bestari Mosque will be completed in 2022. The only concern for Kota Damansara this time is that the budgets for these two mosques, as we see, are RM3 million for the Subang Bestari Mosque and RM10 million for the Kota Damansara Mosque. So I seek an explanation from the State Government: can we complete both these mosques in 2022 with these allocations? Kota Damansara wishes to refer to page 245, PK1, Item 01305, the Sekolah Menengah Agama Tinggi Seksyen 11 (High Religious Secondary School Section 11). Thank you to the State Government for including this programme, this budget for the school. However, Kota Damansara would like to ask: when will the period and date of completion of the High Religious Secondary School in Seksyen 11 be? We all know that there are issues of workers, serious unemployment, global issues, many in Selangor have been retrenched, some have been mistreated by employers, and there are also some... we have discussed at length regarding workers, and Alhamdulillah, in Selangor, perhaps it is one of the only states that has established an Exco for Workers or workers' empowerment, and we also have a specific area of workers' empowerment. However, I looked at this book and checked where it says workers' empowerment, and there is none. So I hope for an explanation from the State Government that there will be a specific allocation in the field of workers to solve this problem, and Kota Damansara would like to know how much allocation has been provided for this workers' empowerment field. Kota Damansara also wishes to propose that a committee be established to address this employment unemployment problem, and it is hoped that more ADUNs who are involved in the future will be included, so that with this committee, the problems of unemployment and workers can be resolved, and this is also in line with promoting social dialogue under the ILO Convention, where employers, workers and government exist. With this allocation and this committee, we can resolve the problems of all three parties: employers, workers and the government. It is also hoped that this committee or this allocation can be used in the best way, more responsibly and transparently by the EXCO.
Next, I refer to page 197, PK4, 040007 – Non-Islamic Affairs. Kota Damansara only hopes that this allocation will be given to the existing application, namely the Kuil Seri Mahamariaman, Seri Mahamariaman, from the Persatuan Penganut Dewi Seri Mahamariaman (RRI). Hopefully, with this allocation, it can be channelled to the construction of the temple. Kota Damansara also extends a thousand thanks to the State Government for its efforts in upgrading the roads of Seksyen 6, 7, 8 and 11 in Kota Damansara. This refers to page 223, PK4, Item 04102. Next, Kota Damansara wishes to refer to page 200, PK15, Item 15001, namely the Renovation of PPR (People's Housing Programme). We know that in Kota Damansara, the PPR in Seksyen 8 often has lift problems, so I hope an allocation of about 4,000, or rather 4 million, can solve the lift problems in the PPR in Seksyen 8, Kota Damansara.
Can I interject briefly?
Sikit aje.
Sila.
Ok. Just briefly. I want to ask for the views of the ADUN for Kota Damansara, yes. This is about the People's Housing Project. In the Seri Setia area we have Lembah Subang, and this one, as we know, is under the Federal Government. Does Kota Damansara agree that I request the State Government to help a little with the Lembah Subang housing, because the ADUN for Damansara must remember that voters are also there?
Thank you. The lift issue is indeed common in the PPR. We have 4.3 million. Hopefully the State Government can help with these lifts at PPR Seksyen 8 and also Ara Damansara. Next, with this, Kota Damansara supports the Motion that has been tabled. Thank you.
Semenyih.
Thank you, Honourable Member, Mr Speaker. Semenyih would like to take the opportunity to debate the Motion
on the development of the State of Selangor. I especially want to refer to P.01, page 196, which concerns the Office of the Menteri Besar, that is PK4, page 197, concerning the Development of Orang Asli Affairs. Apart from Kuala Langat, which was mentioned earlier, the largest Orang Asli population is probably in Selangor. Hulu Langat, I think, is probably number two, apart from Dusun Tua, Semenyih, yes. Adjacent, yes. We can see, in Semenyih, more than 2,000, yes, more than four or five Orang Asli villages in Semenyih. I see that there is still much backwardness, especially, there are indeed Federal-level Orang Asli Welfare Committee parties, which involve what the Orang Asli officers have informed, development only in the Orang Asli village areas. But I hope, with my request, the State Government of Selangor, especially in the Smart Selangor programme, yes, namely to further enhance Internet coverage, yes, because people complain to me that they cannot get it. Without telecommunication towers, I hope the settlements in these Orang Asli villages, we hope the State Government can help, especially regarding learning for Orang Asli children, so that they can be protected, as facilities now are online and so on.
So I feel the Selangor Government should take care, especially in Semenyih. I think they still lack infrastructure. I hope the Menteri Besar's Office, yes, allocates for the Orang Asli as informed, Kuala Langat RM500,000. I hope there is an increase, yes, which also involves the infrastructure in the interior areas. Indeed, JAKOA, the Orang Asli Welfare Department, is responsible for this, but at the level of delivery, at the level of the roads and infrastructure, it appears very bad, especially in Semenyih. Trouble inside, trouble outside. I think the Honourable Members who took part in the Semenyih by-election campaign, I believe you all were involved in Semenyih, can see for yourselves how backward and how poor this infrastructure is. These main roads, apart from the use by each individual, yes, using the land for agro-agriculture and so on, but they also use the Orang Asli roads, many of the Orang Asli settlements' roads are already bad, yes, as informed. So we also ask for the kind help of the State Government to look at these infrastructures, especially the Land Office, yes, it should perhaps be the Land Department. Not the local authority (PBT), no. It should be under the Land Department, the District Land Office, to provide allocations, yes, for main roads and drains so that they can reach where they complain. The Tok Batins complain, Honourable Member, that "we even find it hard to go to school, sometimes vans do not want to enter the Orang Asli settlement areas because of the high maintenance costs of the vans, more than the revenue from the fees for going in and out."
So I think the Government really needs to do this, and I want to ask the State Government about the Sagong Tasi Fund. As we well know, in Selangor, the Sagong Tasi Fund is very popular, yes, even before Pakatan Rakyat, perhaps one of the reasons for the fall of the BN Government in Selangor involved the Orang Asli. The Sagong Tasi Fund, yes, in Dengkil, yes. I hope the Selangor Government, I also want to know how far the Sagong Tasi Fund can provide
benefits, yes, benefits. What I have been informed is that Orang Asli children who succeed in entering higher learning institutions (IPT) are given it, but I think the role of the Sagong Tasi Fund needs to be expanded, in my view, and empowered, namely by providing facilities that are currently needed, namely learning facilities, purchase of computers and so on. So that the support for the learning of Orang Asli children, especially apart from scholarships to, IPT, as mentioned, I think needs to be expanded further. Because we hope we do not have double standards for the Orang Asli.
In particular, apart from the Orang Asli in terms of learning and so on, I think in terms of allowances, yes, the allowances for Tok Batin are also currently paid, as informed, by JAKOA, but we hope that the Selangor State Government, apart from allowances, regardless of allocation from the Tok Batin mentioned earlier, will be given a special allocation, like MPKK, yes, the Chairman of MPKK, KKI, I think, yes, the Indian Community, yes, can get a special allocation. I hope there is a special allocation for Tok Batin from the Selangor State Government, provide a special allocation so that the Tok Batin can administer themselves, yes, and plan development, especially in the villages involved in the State of Selangor. We hope so.
Next, I want to touch on another matter in P.01 as well, the Office of the Menteri Besar. PK 9, page 98, concerning Public Facilities, yes, PBT in Semenyih, we know the areas involved are also two-thirds of the municipality, yes. One-third is traditional villages, what are they, traditional villages. In my area, yes, in Semenyih, Bandar Seri Putra, yes, what I visited and also complaints from the owners, what, the Residents' Association here, for the information of the State Government, namely the public facility of the PBT, which is the football field. I see for myself, yes, where it is so poor in terms of, what, grass and so on, and the fences, the goal posts, all are already so poor, yes. Half is gone, the goal post is already leaning to one side and so on. We hope the PBT, yes, especially MPKJ, yes, and the State Government, hope to give priority, so that sports and public facilities like these, as in Bandar Seri Putera, which mostly involves, what, there is the Islamic University College there, many staff live there, around there, they need these public fields for their children, yes. So my view is that this is necessary, this needs attention, so that
I want to interject briefly. Can you repeat the field that was just mentioned?
The Seri Putra public field. Bandar Seri Putra, yes, Bandar Seri Putera, but in Bangi, yes, but under the Semenyih State Constituency.
Semenyih, your time is up. Can you? It is already red. Yes, I'll give you the chance.
Ada lagi.
Yang terakhir.
Regarding forest enforcement, P.10, page 2114, concerning Forest Enforcement. I think in Semenyih, Bukit Broga, yes, you Honourable Members are all aware. We hope Bukit Broga will be given full attention by the State Government, so that, as informed, perhaps if I am not mistaken, it will be gazetted as a Geo Park. I think Bukit Broga is one of the best recreational places and also raises the name of Semenyih, yes, apart from water pollution and so on. We hope the Government gives important attention to Bukit Broga. Thank you.
Thank you, Semenyih. Sabak.
Thank you, Honourable Speaker. I now go to page 199, the Office of the Menteri Besar and also the State Secretary. PK 13, Code 13003 – Development of District Museums.
In Sabak Bernam there is one museum, the only one in Selangor, namely the Agriculture and Fisheries Museum, but unfortunately it is barely alive, neither here nor there. (Laughter). It can be said that there are almost no visitors. Tourists who go to Sekinchan also do not want to stop at this museum. So I hope it can be upgraded, not only with the replicas that exist, but so that visitors can winnow rice, pound rice, and thresh rice.
Yes, Honourable Member. The problem in Sabak, does the Honourable Member for Sabak not promote it or something?
Apa dia?
Is it the fault of the Honourable Member for Sabak for not promoting it? Why is there no one?
Ok. Good. Thank you. Next, the second one. Page 210 (laughter). Sabak cannot be separated from agriculture. From PK 5, Object Code 505001 – Seeds and 05002 – Land Rehabilitation and Conservation.
As stated by the EXCO, land rehabilitation is very necessary, but very little allocation is given for land rehabilitation, and most importantly, for seeds. I am puzzled why Selangor's rice seeds come from Perak, from Johor and from Kedah. Where has Selangor's seed gone? So I hope the seed nursery at Sungai Burung can be revived, because it is a disgrace that Sekinchan, the largest rice producer, gets its seeds from Kedah. I hope the rice seeds available at Sungai Burung will be reactivated so that rice seeds for padi farmers come from Selangor and we can control the quality of the seeds. What is the use of fertile land if the seeds are not good? I give an example, Sungai Air Tawar: good seeds, good land, ten children. (Laughter).
Good seeds, is it? Fertile.
Go straight to page 277. Public Works Department (JKR). Unfortunately, for 2021 there was no upgrading in DUN Sabak or Sabak Bernam. So I ask that for 2022, Jalan Sekendi to Pekan Sabak, a distance of 10 kilometres, be upgraded from two lanes to four lanes.
Next, page 248, which is the Islamic Religious Department (Jabatan Agama Islam). PK 3 – Mosques. Unfortunately, there are again no new mosques and no repair works on mosques in DUN Sabak. So I ask that in 2022, Masjid Badlishah Parit 6 and Masjid Sultan Muhammad Shah Parit 10, which are rather dilapidated, be given attention. If you do not believe it, the EXCO for Religious Affairs may go and see how dilapidated these two mosques are, so that the 2022 Budget includes an allocation.
Finally, it would not be proper if I did not present a song in this House. (Laughter.) So I will sing a song entitled "Ayah ku Sungai Tua."
Ayah ku Sungai Tua, disayangi rakyat jelata My father of Sungai Tua, loved by the common people
Sanggup tidak beristeri dua, asal rakyat hidup bahagia Willing not to take two wives, as long as the people live happily
Taman Templer kacak orangnya, berbicara penuh bergaya Taman Templer is a handsome man, speaking full of style
ADUN-ADUN kuat bekerja The state assemblymen work hard
Selangor terus maju jaya Selangor keeps moving forward, prosperous
Ayuh Yang Berhormat kita sama-sama Selangor terus maju jaya. Terima kasih. Come on, Honourable Member, let us together see Selangor keep moving forward and prospering. Thank you.
Enough, enough, enough. Alright, alright, that's enough. Yes. Thank you for the song "Selangor Berjaya." Yes, it should not be allowed, but today I will give some leeway. Next time, do not bring songs anymore, yes. If we bring songs, we go and hold a concert. Sabak concert. The ADUN for Sabak can.
Please, Bukit Melawati.
Ouch! Mr Speaker, please look over here a little, Bebas, Mr Speaker. I have been standing for a long time already.
Thank you, Mr Speaker. I would like to continue to....
Bebas must be patient, free style.
I would like to continue to the Development Motion Code, P 01 – Office of the Menteri Besar and State Secretary. PK 4, page 197, 04008 – Citizens' mind development programme. I would like to ask what the content or details of this programme are, which amounts to RM9.3 million.
Next, PK 10.100010203 Tourism. Earlier this year, the Yang Amat Berhormat Dato' Menteri Besar, together with the former EXCO for Tourism, launched the P3S programme, the Selangor State Tourism Refinement Programme (Program Pemurnian Pelancongan Negeri Selangor), at Dataran Melawati, Pekan Lama Kuala Selangor. I would like to ask what is the status of the state tourism master plan or the tourism blueprint, for which an MOU was signed at that event with a company, which the state government may be able to explain.
PK13.13004 Research on Malay Customs, Language and Arts. I would like to ask whether the state government intends to carry out research on the diversity of ethnic languages, races and culture in the state of Selangor, because, taking the Malay ethnic group as an example alone, we already have Javanese, Banjarese, Bugis and so on. So does the state government intend to conduct studies and document them so that they can serve as a reference for future generations regarding the origins of the ethnic groups in this state of Selangor.
Next, PK17. 1700809 Establishment of Historical Zones. What is mentioned here are the historical zones of Batu Arang and also Klang. So I would like to ask what the requirements or criteria for these historical zones are, and whether the state government intends to make Bukit Melawati or Kota Melawati a historical zone.
Next, Selangor Islamic Religious Department (Jabatan Agama Islam Selangor), P14. PK303901 Repair and Upgrading of District Mosques. I would like to draw the state government's attention to re-examine the management's application to upgrade the facilities for persons with disabilities (OKU) at Masjid Jamek Sultan Ibrahim in Kuala Selangor, because this mosque is not equipped with OKU facilities. Because of the design of the mosque, its musolla is located high up, so worshippers have to climb many steps to pray in the musolla. So there is no ramp or path for OKU worshippers. So I ask the government to reconsider, so that this mosque and other mosques too, both future and existing ones, must be OKU-friendly, so that it is in line with the SDGs principle, namely Sustainable Development Goals "no one left behind."
And P12, Selangor State Public Works Department (JKR). PK404701 Upgrading of the road at Simpang Empat, Persimpangan Jalan Kereta Api Lama, Jalan Teluk Piah Kanan, Jalan Rawang, Kuala Selangor.
I thank the state government very much for providing an allocation of RM500,000 for upgrading works in this area in my constituency, because I have raised this issue many times over the past two years, both through the District Action Meeting (Mesyuarat Tindakan Daerah) and through written applications, because the accident rate at this junction is very high, including fatal accidents. The JKR Kuala Selangor has also carried out a study. As far as I remember, perhaps in this half year. So I would like to know what the findings of the study on this junction are, and what the plan is for upgrading this junction as referred to. And finally, I would also like to thank the state government for the allocation provided to upgrade Jalan Club from Simpang Jalan Rawang to Jalan Persekutuan, which is also in my constituency. Thank you. I support.
Tuan Speaker.
Kuang.
Thank you, Mr Speaker. I would like to refer to Development Code P12, Project Code 4200 Gombak. Regarding the upgrading of Jalan Melawati, Kuang, Mukim Rawang, Daerah Gombak, which has been allocated RM3 million. I believe this is an allocation carried over from 2020, because this project was reported to have been delayed by a year from its expected completion at the end of December 2019, but now it has passed that date by a very long time, nearly a year. So I want to give some views, because from the beginning this project was stalled due to the lack of readiness of the consultant in preparing the proposal papers or tender documents, which caused some utilities, or the utilities underground and so on, not to be prepared with complete details, including water utilities, underground water pipes, telecommunications, electrical cables and so on. And this delay has caused anxiety among the residents of Kuang in particular, because every time an accident occurs at that junction, the first person who is asked is the Wakil Rakyat. Yet that is a very worrying process for us in Kuang, because in the year of delay, it is due to the management of the Consultants in preparing those details, because they could not determine how many utilities are underground, since the mapping of the existing cables or underground water pipes did not get complete details. So I want to give my views on this matter so that it does not happen again for Project Code 04206, namely the upgrading of the road at Jalan Melati Bukit Aman Putera, and also Project Code 04207, the upgrading of Jalan Simpang Empat B25, Jalan Kundang. Because I know that in the 2021 allocation there is only a token of RM10. Only a token of RM10, which shows that the
project may be in the state government's plan to be implemented in 2022 or 2023 perhaps. However, I want to stress once again that the appointed Consultant must prepare complete documents and obtain truly complete details from the utility parties, so that what happened at this Lorong Melati junction does not happen again. The contractor's delay in completing this project over such a long period of a year is due to the weaknesses I mentioned earlier. This is what we want to emphasise, so that JKR in particular, which will handle this project, ensures that the appointed Consultant really, really carries out his duties. Especially in determining the utilities underground or under the road. Next, what I hope for from Project Codes 04206 and 207 is that it is not just this RM10 token in 2021 only. I hope that if there is any surplus or excess from other project codes, the feasibility study for this project can be carried out in 2021. Because the condition of Jalan Kundang and also Lorong Melati up to Taman Ramal Putera is quite congested, and it is traffic very heavy in the morning and also in the afternoon. The congestion may last about one, or roughly one and a half or one hour, from Persimpangan Melati all the way to Persimpangan Lorong Melati and Persimpangan Bukit Ramal Putera. So I ask that the government take appropriate action regarding what I said earlier about the RM10 token. This RM10 should be given very careful attention, to ensure that the projects implemented by the government, especially JKR, meet the standards and do not disrupt traffic flow in the future.
Regarding P01 PK4, Project Code PK4, Orang Asli Affairs Development. In Kuang there is only one Orang Asli village, namely Kampung Hulu Kuang. And I thank the Yang Amat Berhormat Menteri Besar for coming to have breakfast with the Orang Asli, and also the EXCO. I thank you for being willing to attend. EXCO YB Hee for having attended together....
Yang Berhormat. Yang Berhormat.
The Honourable Member for being with the Orang Asli in the area of Kampung Hulu Kuang, having breakfast with them. This is a very good approach, because since the village of Kampung Hulu Kuang was established, not a single Menteri Besar has ever come. So I would like to congratulate the Yang Amat Berhormat Dato' Menteri Besar for accepting my invitation to have breakfast with the residents in the area...
Yes, Kuang, time.
A little more. I would also like to thank...
The last one. The last one. The last sentence..
To the Yang Amat Berhormat, for having approved a sum of RM100,000 for repair works on the Orang Asli houses in the Hulu Kuang area. What touched us when I made a visit together with the Honourable EXCO was that there are Orang Asli houses built in 2008 that have only planks. The meter was not there. Wiring was not there either. The wiring was inside the house, the meter board was there, but the meter was not, since 2008 up to the date we made the visit together with the Honourable EXCO. This shows us that the Orang Asli community is marginalised, because they are marginalised by what, this....
Already marginalised? Can sit...
Ok, the very last one..
The last. The last.
Ok, the very last one. I would like to thank Mr Speaker for giving me this last opportunity to debate the Development Expenditure 2021. Thank you.
Thank you, Kuang. I call Jeram.
Thank you, Mr Speaker, I have two minutes. So I cannot sing today. My initial intention was to sing. But before that, see page 220, Project Code PK101701. I just want to comment on this one thing. Before that, before I forget, I want to congratulate the Yang Berhormat EXCO for Sports, when Semenyih was mentioned he took note. I hope that the Yang Berhormat EXCO will look into this carefully too, because I brought up this issue, and I raised the same issue last year during the sitting, namely regarding installing street lights and traffic lights in the District of Kuala Selangor. Yes, the same matter, where last year I said 500,000 was for five DUNs. Meaning, when we raise this issue, the government takes it lightly, because at least there should be some addition to satisfy the one raising it. So it is still 500,000 again this year. So 500,000, if building traffic lights, is 300,000 to 500,000. So it has been three years already, and I have not seen even one pole of light in this village area. The villagers here are not asking for much. Before I forget too, Bukit Melawati, yes, they get this and that bit by bit.
I heard earlier that Ijok was also pitied, "please look at Ijok, please look at Ijok," and likewise Jeram, "we are begging for sympathy or begging for affection from the Selangor state government." So I want to ask the Yang Berhormat EXCO, please answer, how many lights have been installed in DUN Jeram in these two or three years. I want to know the number, the figure.
Time's up. Please end.
Tamatkan?
Ya, tamatkan.
I'll continue later, yes.
No. No. End it.
So I ask the Yang Berhormat EXCO, please, this time. I have already asked last time, I already asked for the street lights to be separated. I ask the Yang Berhormat EXCO, five or ten is enough for one term. No need for many, five or ten for Jeram. Ok.
Yes, understood. Ok. End it. Time.
End it. Thank you lah.
Ok. Please. Thank you.
So, Yang Berhormat..
Tamatkan.
Yes, I am about to end. But this time, for the JKR, I do not support this allocation part. Thank you.
Yes. End. Honourable Members, a total of 24 State Assembly Members have debated the Development Motion, so the debate is concluded. Therefore, I hereby, the time shows 1.00 pm, adjourn the House until 2.30 pm. The House is adjourned.
(THE HOUSE ADJOURNED)
(THE HOUSE RESUMED)
(THE DEPUTY SPEAKER PRESIDED)
The Government side is invited to deliver the winding-up.
Thank you, Mr Speaker. In response to the questions from the Honourable Member for Seri Setia and also Kota Anggerik, concerning the need for new museums in the State of Selangor. The proposal to build the opening of the Stamp Museum and also the Textile Museum and also the sports museum of the State of Selangor. The Stamp Museum is a museum located in the centre of Shah Alam City, near POS Shah Alam. The purpose of this Stamp Museum is to preserve the nation's heritage treasures that record history up to the formation of the Nation of Malaysia. Stamps are small documents but an important proof of history, of the formation of the nation. The amount approved for the construction and content of the Stamp Museum is RM15 million. For the development and content, RM4 million. And for the Stamp Museum, the construction has reached 13% of 12%. Construction is handled by the Public Works Department (JKR) and is expected to be completed in 2022.
As for the Textile Museum, the proposed Selangor Textile Museum is located in the Anggerik Building, which is the former State Public Library of Selangor that has moved to Seksyen 13. The establishment of the Selangor Textile Museum is based on the views of His Royal Highness the Sultan of Selangor, who considers it necessary for the State of Selangor to have a Textile Museum to exhibit high-status traditional textiles such as telepuk, cindai, songket and also Selangor attire.
This museum will also collect, preserve, interpret and exhibit textiles that have important historical, artistic, cultural or scholarly value for public education. Based on the assessment by PADAT through 4 published books, namely Buku Kesenian Warisan, Telepuk Selangor and Telepuk Alam Melayu, Kebaya Selangor and also kelingkam Selangor, it has proven that Selangor has a heritage of traditional textile arts and the art of decorating cloth through telepuk and also kelingkam embroidery. Meanwhile, the women's attire is the Kebaya Negeri Selangor.
Next, the Sports Museum. The proposal to build a Sports Museum is the command of His Royal Highness the Sultan of Selangor, who wishes this Sports Museum to store all the treasures and progress of sport in the State for the viewing of the present and future generations. These treasures will be stored and will contain various information and historical collections related to sport that are priceless in depicting the function,
role and also of sport in advancing the progress of the state and also the nation. This Sports Museum is proposed to be built at the Shah Alam Stadium with an allocation of RM22 million.
Next, I note the proposal from Kota Anggerik regarding the implementation of this Textile Museum, that research needs to be carried out together with the textile museum in Bangkok, Thailand. InsyaAllah, we will go through PADAT, and we will contact them to obtain information from the experience of the museum in Bangkok.
Next, regarding the Shah Alam Theatre. For the information of the Honourable Member, the Shah Alam Theatre was under the administration of PADAT for 3 years and was handed over by MBSA to PADAT. This theatre is used as a venue for performances related to arts and culture. Over those 3 years, PADAT organised, among others, programmes such as the Koir Kota Seni Shah Alam and also the Tarian Selangor, the cemperling music competition and many more programmes that have been held at the Shah Alam Theatre, and we also rent it out to the private sector. For 2020, many of the planned programmes have been postponed in view of the Movement Control Order (PKP) for COVID-19, namely Teater Bangsawan and Simfoni Cemperling Alam Melayu. And InsyaAllah we will continue with the planned programmes.
Next, in response to the question from the Honourable Member for Sentosa, Deputy Speaker, the State Government notes that the project of the Chinese and Indian Cultural Centre, which is frequently raised in the House even though an explanation has been given since 2018. For information, the Government always safeguards the interests and social development and preserves the customs and culture of all races in the State of Selangor. It is the aspiration and inspiration of the State Government to implement the development of Malay, Chinese and Indian culture in the State of Selangor. In an effort to face, to uphold the various arts and cultures that are harmonious in society.
However, the State Government remains committed to developing an integrated cultural centre for the State of Selangor. Therefore, as announced by the Most Honourable Dato' Menteri Besar during the tabling of the Selangor Budget 2020 earlier, the State Government has planned to establish a Selangor Cultural Village that can become a reference centre on the history of traditional culture and other ethnic groups in the State of Selangor, located on a plot of land measuring 35 acres on the bank of the Klang River in the centre of Klang city. A sum of RM5 million has been allocated for this purpose, and it is believed it will be able to increase the element of attraction for the future Selangor project.
Next, I would like to answer the question from the Honourable Member for Meru, which concerns promotion. In printed media, promotion is also carried out through the writing of historical and tourism articles that are widely published by local Malay and English-language media such as Harian Metro, Berita Harian, The Star, Gaya Travel and others. For electronic media, PADAT also collaborates with local production houses that produce various documentaries in the form of tourism filming, which are broadcast on various local television stations such as RTM, Astro Ria, Astro Awani and TV3, in the form of social media. PADAT also holds promotions for museums and monuments through PADAT's Facebook, Instagram and also Twitter pages. PADAT also always collaborates with Tourism Sdn Bhd, or TSSB, through programmes organised by Tourism Selangor, which are also attended by local and foreign media as well as tourism and filming bloggers.
In response to the question raised by the Honourable Member for Bukit Melawati. So far, for the preparation of language, PADAT has not yet carried out a study. However, PADAT has begun collecting and strengthening the palace language that is increasingly dying out, which has caused ordinary people to no longer use it when they are in the Palace.
And another very important study concerns the use of existing Jawi script in mosques, public places, traditional villages and historical sites in the State of Selangor, in collaboration with Universiti Putera Malaysia or UPM. This aims to ensure that every Jawi spelling used is correct in terms of the letters used.
Next, the question from Bukit Melawati regarding the historical zone. I also recall this is closely related to the answer for Hulu Kelang, where this historical zone has several conditions, namely, first, a historical zone is an area identified as the original town area where the original place remains intact, the town and also the site. Most of it is still intact and not polluted by other activities. Therefore, a detailed study needs to be carried out to ensure the extent of the areas based on indicators of building architecture, original areas and original river and drainage routes. Cultural arts must be practised, including religious activities and daily activities in the area. And so far PADAT has proposed that, among those to be made into a historical zone, namely Bandar Klang including Bukit Melawati will be made into a historical zone. That is all, thank you, Deputy Speaker.
Kinrara.
Deputy Speaker, I would like to give feedback on the issues raised by the Honourable Member for Lembah Jaya during the Budget debate. The Honourable Member for Lembah Jaya requested the addition of park facilities, especially in low-cost flat areas, and
also more attractive landscaping and the creation of a green network of pedestrian and cycling paths.
For the information of the Honourable Member, for 2021 the allocation for infrastructure upgrading and public facilities in local authority areas (PBT) is estimated at only RM2.5 million. Given that the allocation is not large, priority will be given to any public facilities that have been damaged and need to be repaired immediately. As for landscaping, pedestrian and cycling paths, I believe the PBTs have taken the initiative to plan these matters in their 2021 Budgets. For your information, PBTs in the State of Selangor have already taken the initiative to provide separate cycling lanes from the road so that cyclists do not share with other vehicles. For example, the Shah Alam City Council has provided cycling lanes beginning in 2015, for the construction of cycling lane phase 1 totalling 9 kilometres. This was followed by phase 1A, along 15 kilometres, and now phase 2, along 5 kilometres. Some of these areas are equipped with bicycle parking at the cycling tracks and signboards, besides complementing bus services, especially the Smart Selangor bus.
MBPJ, meanwhile, has provided a network of pedestrian and cycling paths that also takes into account design and crime prevention needs. Beginning in 2015, MBPJ has required a review of the need to provide pedestrian and cycling paths for project approval applications in Petaling Jaya.
The Honourable Member for Lembah Setia also touched on the issue of holding workshops and campaigns for waste segregation activities. For your information, initiatives in solid waste segregation have begun to be implemented by PBTs through recycling pilot projects. Among them, the Shah Alam City Council has begun implementing a small-scale waste segregation programme starting in 2015, involving a total of 8,449 units of selected landed houses, that is, landed houses, up to 2019, and increasing to 98 thousand units in October 2018.
Now MBSA will plan to further expand the programme to high-rise residential areas. MBPJ, meanwhile, has a variety of 3R programmes. In 2020, a total of 29% of landed residential units were provided with house-to-house recyclable goods collection services. Up to September 2020, a total of 90 tonnes of waste was composted and a total of 341 tonnes of recyclable goods were collected by strategic partners, and 48 tonnes of food waste was composted.
MBSJ has set up an Integrated Biomass Centre, where activities include composting of garden waste, composting of vegetables, worm composting projects, and biogas waste-to-energy and anaerobic digestion. For MPS (Selayang), a Research and Development Centre (R&D Centre) has been set up for domestic waste management within the MPS administrative area. This centre is becoming a pilot project for a domestic waste treatment system using the organocycler method at the Rawang Integrated Industrial Park. Domestic waste will be sent and processed to become fertiliser and reduce the use of land for landfill sites, thank you.
Please, the Honourable Member for Paya Jaras.
Thank you, Honourable Deputy Speaker. I would like to respond to several issues relating to the Sports Complex and to those raised by the Honourable Member for Sungai Ramal, the Honourable Member for Rawang and the Honourable Member for Semenyih. I will first go to the Honourable Member for Sungai Ramal, who raised the status of the restoration of the Bandar Baru Bangi Sports Complex. However, does the Honourable Member know that when we were in power in Putrajaya, after 2018, the Honourable Minister of Youth and Sports at that time cut the budget for the restoration of the Bandar Baru sports complex, including the process of repairing the track, using allocations under the Member of Parliament for Serdang at present. And throughout the period of five (5) years, MPKJ never, never opened a budget. This is because, at that time, we already had a restoration process from the Federal Government and from the Member of Parliament himself. However, for the Honourable Member's information, this year we have approved a budget of RM128,280.00 for Sungai Ramal to upgrade the sports courts at Jalan PKNS 2, Sungai Ramal Luar, Kajang. So, that was the Honourable Member's application and we have approved it for this year.
Second, the matter raised by the Honourable Member for Rawang, relating to Padang Kenanga, which in the Honourable Member's view took too long to resolve. I, the entire application that the Honourable Member for Rawang submitted to our Office to repair three (3) sports facilities, the total application from the Honourable Member is RM1.95 million, RM1.195 million, so, it is highly impossible, based on that RM2.24 million, for us to give that full amount to the Honourable Member. However, Honourable Member, for the field the Honourable Member mentioned, we have in fact approved, under MPS. That is, not all of it. We cannot approve everything because our priority is preliminary work including levelling the land, felling trees, cleaning, top dressing and planting trees for spot turfing, which we have approved. InshaAllah, the Honourable Member will receive those facilities in the near future. For the Honourable Member's information as well, in 2019, the total allocation from the Government to the Rawang State Constituency (DUN) itself was RM124,925.00 to restore the football field at Kampung Melayu Batu 16, Rawang, which has been processed. So, Honourable Member, do not worry, we take into account the views of the Honourable Members.
The third issue raised by the Honourable Member for Semenyih concerns the field at Seri Putra. I give the Honourable Member my assurance,
Honourable Member for Semenyih, do not worry, we will look into the matter. Although in the application to our Office, the Honourable Member did not even mention Seri Putra, we have received several applications, and recently we approved the construction of a sepak takraw and badminton court on the open land of Taman Kajang Prima, Mukim Semenyih, Hulu Langat district. We have also given it even though the Honourable Member is from the opposition state seat, we do not politicise the issue of sports facilities. So, I will look at what the Honourable Member said about Seri Putra earlier, and hopefully it will help the Honourable Member to develop our sports facilities at the level of the Honourable Member's own state constituency. Next, also raised by the Honourable Member for Meru, I congratulate those among the people of Meru who have become champions in motorsport. The State Government has not abandoned this motorsport; in fact we have built and upgraded the motorsport racing track in Kuala Selangor by fully refurbishing it, and it is among the places we use for motorsport.
Our second proposal was what we had long intended to develop, namely in Sungai Tua. However, based on a study carried out by our consultant, the area mentioned at Sungai Tua, measuring 20 acres, is not suitable because the terrain is uneven and the area is also a water catchment area. So, we are now waiting for the Selangor State Land and Mines Office and the Gombak District Office to propose a new piece of land where we will build soon, InshaAllah. The issue raised by the Honourable Member for Ijok, we understand the concern or attention of the Honourable Member, whether it is necessary now, what was mentioned is RM44 million but for sports alone it is RM10 million. For the Honourable Member's information, the Government is indeed very concerned about the current situation. However, our constraint is that this sports matter, Honourable Member, cannot be budgeted this year, this year's sport. Sport, if we want SUKMA in 2022, we must start training now. It cannot be done in that year, and for the Honourable Member's information, out of our own concern, the Government has reduced the budget from RM15 million to RM10 million this year, due to the needs of other places. So, Honourable Member, the salaries we allocate are actually to help the welfare of our players. Administrative salaries and so on. So, I think if we compare RM10 million against our RM1.3 billion budget, only 0.9% is used for football itself. And, InshaAllah, we will look at which items in other places are not necessary, and we will reduce them, in view of the current COVID concern.
For the information of all Honourable Members, SUKMA has indeed been decided at the SUKMA Supreme Council meeting yesterday, together with the Honourable Minister, we have had to postpone our SUKMA from 2021 to 2022. So, after 2022, 2024, in that decision, Selangor and the National Sports Council, InshaAllah, have the opportunity to host after Johor, in Johor later.
So, that is how it is, Honourable Member, this sport, we cannot, this year it has to, it has its pro-run process. There is training, practice, observation, supervision, and only then proceed to sport. Recently, the Honourable Member for Sabak, indeed in one of the debates mentioned, could we not postpone SUKMA? What is the need now? However, Honourable Member, for sport, if our athletes, our players, our players, our athletes, where is their measure? If we suspend our participation in SUKMA, then there will be no benchmark or achievement for our athletes to be measured by. So, Selangor has been among the best states in the SUKMA standings all this time, and I think we will continue to be committed to the SUKMA programme even though the Honourable Member for Sabak expressed concern about SUKMA, but at the same time he wants to develop takraw in his own area recently. But the State Government's commitment is within the framework, even with a small, limited budget, our commitment is to continue participating in SUKMA and programmes at the National level. Thank you, Deputy Speaker.
The Honourable Member for Seri Serdang is invited to speak.
Thank you, Honourable Deputy Speaker. The Honourable Member for Sungai Ramal asked about empowerment programmes for men, yes. Honourable Mr Speaker and the Honourable Member for Sungai Ramal, in fact VOT P.K. 6, although it is seen as a Women's Development Programme, there is in fact room for men, yes. Under our PWB programme, we have capacity-building modules, and we have seen that these suitable programmes and modules are indeed also open to fathers. Indeed, I myself have seen that there are skills programmes in which fathers participate together with women. Among the capacity-building programmes, the Empowered Women's Centre (PWB) that is suitable for men's empowerment is the entrepreneurship module, which provides exposure on what entrepreneurship is and the purpose of becoming an entrepreneur, conveys basic knowledge, starting a business and empowering participants to face the challenging world of entrepreneurship and business.
Another module that we indeed open to everyone is the Basic Investment Module. Identifying types of investment and assessing investment performance, the importance of planning for uncertainty, the need for protection and knowing the different types of protection, tips on buying insurance, takaful policies, to avoid unnecessary coverage. We also have a personal and family financial management module. These are basic modules, which although we seem to say, 'ha, this one is for women', many men still do not understand financial management such as cash flow and budget management, the importance of investment, basics of borrowing and debt management. So, I urge our male citizens that they can actually join in PWB programmes. We have one more module that
may interest men, namely democratisation and citizens' rights, yes. The Empowered Women's Centre welcomes the greater participation of more fathers in the capacity-building programmes organised. Apart from the PWB programmes, the Standing Committee on Development and Family has also in fact allocated RM200,000.00 for the implementation of family development and fatherhood programmes. Among the challenges we face in attracting fathers to the programmes, in attracting men to the programmes organised by the Standing Committee on Women's Development, so we run programmes for family development because we know that without men, family development will also be stunted. The Family Picnic Programme we started from 2016, in 2019 that day, there was the Family Knowledge Forum, which before the COVID pandemic, was organised at Taman Tasik Shah Alam with an estimated attendance of 500 to 1,000 people per series, meaning together with the family. In our planning, if there were no COVID pandemic, we had already moved to the districts to bring this programme closer to the community. In this programme, we have a programme with special children, a Family Legal Clinic, competitions for children and others, yes, so that we can attract fathers together with family members. But, in 2020 this Family Picnic Programme, we had to change its delivery to an online concept and we have started it on the Facebook page, Selangor 3W, there are 15 series of Family Knowledge Forums to be organised starting 7 November, it has already started, yes, and this programme is broadcast for 1 hour every Wednesday and Saturday at 10.00 in the morning.
Apart from the Family Knowledge Forum Programme, there are also other side programmes for children and which are very inclusive to fathers. We have a special programme with the specific aim for fathers, the Papaku Adiwira Programme, yes, which is to enhance the development or empowerment of fathers by focusing on the fatherhood skills module. And last year we had 12 series of Papaku Adiwira, also implemented to fill the slot of the 3W Carnival before this Covid-19, but this time we will continue once again with this Facebook page, Selangor 3W, starting from, it will start this November and again on Tuesdays and Fridays. But this is at night, 8.00 pm. And these are among the things we do to be inclusive to men.
Regarding the question of a programme to encourage men to quit smoking, in fact we already have many programmes organised by the Ministry of Health (KKM), yes, and this has been emphasised in, by the Ministry of Health, which introduced smoking cessation services as one of the National Programmes under the National Strategic Plan for tobacco control and tobacco products, the latest for 2021 to 2025 and coordinated by the Framework Convention on Tobacco Control Secretariat, KKM, Putrajaya. All of this has been started and at the national level, in fact, it is chaired by the Honourable Minister of Health himself. In Selangor, we have 12 hospitals, 73 Health Clinics and 65 accredited private facilities providing this service until June 2020. The smoking cessation rate for the State of Selangor is 48.46%, exceeding the National target set at 30%. This means it is a good programme, only whether one wants to or not, goes. Apart from that, we have the Smoke-Free Home Programme, RBAR, also introduced as one of the tobacco control programmes implemented to promote and raise awareness among community members about the dangers of cigarette smoke. Until June 2020, a total of 1,060 homes have been involved in this programme, involving 106 KOSPEN Localities throughout the State of Selangor. Other community programmes were also held such as the Blue Ribbon Campaign, BRC, Council Shops Smoke-Free and the mQuit Programme at Institutions of Higher Learning and mQuit Mosque, and InshaAllah Selangor will also name 1 area called the Smoke Free City Zone. I have not yet made a decision on which area will become this Smoke Free City Zone, meaning smoking will not be allowed in that area. I welcome the proposal for us to consider together with the Selangor State Health Department. So, that is all my answer to the Honourable Member for Sungai Ramal. Thank you.
I invite the Honourable Member for Pandan Indah.
Thank you, Honourable Member. Mr Deputy Speaker. Honourable Members all, I will try to answer. Most of it, I think I cannot guarantee that I can answer everything, but I will try to answer what has been raised. The first is in relation to the question from the Honourable Member for Banting on the issue of road B124 or B126. Actually, both, Honourable Members, both will be given consideration in implementation. This refers to the first item, PK020004, which is to build a bridge to connect road B124 in Bandar Jenjarom to road B340 to Jalan Kampung Sungai Buaya. This will involve a single carriageway road, and the length of this bridge is 450 metres, which will involve upgrading the junction on road B124. All works, including electrical works, drainage and so on, will be included in the scope. The second is a project involving road B126, namely the Project to Upgrade the Alternative Route to Klang from the junction of route FT005 at Kampung Jenjarom under item PK04401, and the scope of this also includes upgrading and a bridge along 28 to 12 kilometres according to RR4, from dual carriageway, dual line to single carriageway. Upgrading of the traffic light junction, drains and everything else is included in the scope of works under this road, this B126.
Next, Labohan Dagang. I have already informed and I repeat once again that Phase 1 is indeed complete. Only what is not complete is the reticulation system, or piping to Jugra, to the balancing pond at Jugra, which will be completed one year from now, January 2022, about one more year before completion. That is regarding Labohan Dagang. We are indeed giving full attention to ensure water supply can be channelled properly in the Kuala Langat area.
For TKPM, the allocation of RM1.9 million is for all TKPM under the Department of Agriculture except at Sungai Kelambu, because the TKPM at Sungai Kelambu is still not completed. So I ask for cooperation from the EXCO member responsible for the Environment, who oversees under the Forestry Department, so that we can find a solution to this issue, so that, for a long time, I understand the Honourable Member for Banting has raised this many times, so that we can resolve the issue of TKPM at Sungai Kelambu quickly.
Next, for the road from Sungai Kelambu to Genting Sanyen, this refers to item PK03401. The estimated cost of this project is indeed large, namely RM178,261,000.00, and it is at the stage of finalising the Land Acquisition Plan. There are still issues with land, and the JKR is in the process of coordinating its alignment with the developer, other groups, and it also involves forest reserves. This is in the process of resolution. The scope of the project for this road is an upgrade along 1.5 kilometres and building a new road of up to 7 kilometres to the 4 standard, namely single carriageway, also involving upgrading of junctions, installation of street lights, drainage and everything related to road construction or upgrading. This is for Jalan Sungai Kelambu.
For the road from Jalan Utama Seri Cerding P60 to the Gamuda Cove Interchange, the estimated cost of this project is RM168 million under item PK044002. This involves upgrading the village road to a single carriageway road of RR5 standard along 11.7 kilometres. This will be carried out in 2 phases, package 1 along 3 to 4 kilometres and package 2 along 8 to 9 kilometres. This involves 4 main junctions, and everything related, including installation of lights and so on, is all involved in this project. We will allocate for RMK12, giving priority to Phase 1 to provide a connecting road from road B60 towards the south and link this road, the one now at Seri Cerding, to the road built by the developer Gamuda Cove. This is a priority, the priority is to complete and finish Phase 1 of this road first.
Next, regarding the issue raised by the Honourable Member for Sentosa about Jalan Sungai Kandis. For the Honourable Member's information, Jalan Sungai Kandis is a State Road that connects with a Federal Road, namely Jalan Kebun FT190. So the proposal to upgrade the Sungai Kandis junction has been included in the RMK12 Project under item PK04307, under the title Upgrading of Jalan Sungai Kandis Junction, with an estimated cost of RM12.9 million. This project involves upgrading the Jalan Sungai Kandis junction to R4 standard, building a service road at the Jalan Sungai Kandis junction, upgrading the drainage system, and also issues related to land acquisition and utility diversion. This is included in the project at Sungai Kandis.
I would also like to touch on the issue raised by Taman Medan regarding litter traps in the allocation. We indeed have an allocation provided for litter traps in the rivers that we have identified, and we will continue to monitor and see the need for these litter traps in the rivers in the Taman Medan area.
On the issue of catfish, I want to mention here, do not be surprised if there are catfish, because even in polluted rivers there are catfish, because they are indeed resilient. This fish can survive, and there are many big ones in the Klang River, and most of them are caught and made into fishballs. So if you want to eat fishballs, you must be careful, indeed the fish from the Klang River, there are indeed many big catfish.
This is for information only. That means it is not necessarily the case that only clean water can sustain life. All fish can live in water that is a bit more hardy, this fish is like that.
I would also like to touch on what was raised by Pandamaran, the issue related to infrastructure that focuses only on Jalan Bukit Rimau, Jalan Teluk Gong and so on, and asks for attention to village roads. For the Honourable Member's information, the P12 allocation of the Public Works Department is for State roads. However, for proposals to upgrade village roads, they will be applied for to the Ministry of Rural Development. So far, I do not know whether the allocation comes from the Ministry of Rural Development to upgrade village roads. However, the JKR monitors and submits applications through the Roads Branch of JKR Malaysia to obtain allocation for upgrading village roads that are under the responsibility of the Ministry of Rural Development in terms of their allocation. Up to 30 October 2020, the JKR Selangor has received 18 applications at district level to upgrade these village roads, and has forwarded the applications to the Roads Branch of the JKR Headquarters on 30 October 2020, recently.
I would also like to congratulate Pandamaran, who is so concerned about the problems of surau, mosques and KAFA. I am indeed impressed, because this proves that the DAP State Assemblyman is concerned about the problems of Islamic religious matters. It was never said that DAP does not care about issues related to Islamic religion, so congratulations.
Next, regarding the comment made by the Honourable Member for Sungai Ramal, so I would like to inform Sungai Ramal that the issue of not paying electricity bills is not true. I already knew this from the beginning. So far, the JKR indeed has no issue in terms of electricity bill payments, but there are other agencies, I do not want to mention them, later some people will be upset, and will not pay their electricity bills. I received complaints from TNB that some did not pay, but it was not JKR, JKR pays. The real issue here is that some were without power due to cable replacement works that took place and were carried out around Persiaran Pekeliling from Seksyen 7 to the NIOSH Roundabout. That is what happened, and we carried out this replacement, meaning the cable connecting to the TNB meter had to be cut to avoid undesirable incidents from occurring, and now the improvement works have been carried out and completed, and the electricity supply has been reconnected, not because of non-payment of bills.
So, regarding street lights, I would also like to mention generally that the implementation of street lights carried out in Klang is somewhat special, which I want to tell you, because Klang received an additional allocation from the Federal Government for street lights, meaning it received 542 units for these Solar LED Lights. The State allocation is only 60 units, which we distribute. So, however, we, the State, do not discriminate or treat anyone as a stepchild. We will implement the use of Solar LED Lights according to priority. It is not impossible to do everything at once. So we will follow priorities based on 2 matters. First, the rate of vandalism, the place with the highest vandalism is the one we replace the fastest, but do not encourage people to vandalise these lights. So we give priority, and the second is the problem of connecting supply to the feeder pillar. If the place is far from the feeder pillar to connect electricity supply for the lights, then that place qualifies to be a priority for installing these Solar LED lights. But our proposal is that we will indeed replace the whole thing with these lights, because these lights are environmentally friendly, and secondly, they will indeed reduce or there will be no trips, if there are trips, there will be none, but maintenance costs remain, because the batteries, after certain years, must be replaced, but perhaps after 3 years or more. But it reduces our electricity bills, and most importantly, vandalism is minimised as much as possible. This is what we make a priority, and we will do it in stages at all locations. I have received many applications from many Honourable Members asking for these to be installed in their areas, because there was too much publicity by Pelabuhan Klang, but it is alright, we will take note of this matter.
Next, regarding the issue raised by Kota Anggerik, there was a matter raised. I apologise for being a bit late, but in this year's budget, RM10 million has been included for the Development of Flood Retention Pond to solve the flood problem in Taman Mutiara. It is delayed not for any particular reason, but because the land belongs to the Malaysian Highway Authority, that is why the process of obtaining approval was a bit slow, although the Chairman is here, the Chairman of the Malaysian Highway Authority is not here, but we have succeeded in obtaining approval and we will begin the preliminary works to design and so on, for the solution to the flooding of Taman Mutiara.
Regarding the issue raised by Sabak earlier, Sabak raised many agricultural issues, which I will answer. Firstly, for information, the issue of paddy, or paddy seeds, or seeds, this is actually not under the responsibility of the State. It is indeed managed by the Ministry of Agriculture, and there is indeed a bit of an issue in terms of quota, because what is Selangor's need per year for paddy seeds? It is 45,000 tonnes. Only one company supplies in Selangor, namely HMN Malaysia Sdn. Bhd., whose quota is only 20,000 tonnes. So that means another 25,000 tonnes must be obtained from other states. This is indeed the reality. Any feedback from us, we will always liaise with the Ministry of Agriculture to inform them of this issue, and I think there has been feedback from us to them.
In relation to the issue of soil treatment raised, for the Honourable Member's information, the issue of soil treatment does have allocation through the Department of Agriculture, but also under UPEN, the State Economic Planning Unit, we also provide, and we have also implemented it in several areas in Parit 10, if I am not mistaken, for soil treatment, and we found the results are indeed very good. Rice yields have increased in this area, about 60 hectares that we cultivated as a trial or pilot project. This indeed shows that when we treat using environmentally friendly methods and also this EM, this Micro, we found that after 2 seasons, 3 seasons, their yields increased and the plants' resistance was high. Around them all were affected by disease, but in this area, the plant resistance was higher. So we will expand it for the coming seasons to wider areas. But the State allocation, as is well known, is very limited, because the paddy area is 18,000 hectares, and is cultivated under the IADA Barat Laut of the Federal Government. That is why most assistance, fertiliser assistance and so on, we depend on the Federal Government to provide allocation to cover it. If we alone are unable to manage an area as large as this, we will continue to liaise with them.
For Pelabuhan Klang, regarding the road issue earlier, which refers to PK04304, namely the Upgrading of Road B148, Jalan Teluk Gong from the Glenmarie Golf Junction up to the Jalan Ikan Tenggiri junction. This is a continuation project of RMK12 from RMK11 to RMK12, continue, yes. With an estimated cost of RM128,0830, and this project, the land acquisition plan for Section 4 and Section 8 has been finalised, but the process of finalising land acquisition for Section 4 and Section 8 is not yet in progress. The official search process has been carried out, and a total of 137 lots are involved. The allocation for 2021 is RM4.8 million for land acquisition matters that will take place on this road. The length of the alignment is 6 kilometres, and according to U3, namely 4 lanes, and the road width is 3.2 metres, involving all motorcycle lanes, street lights, drainage and so on, are included in the scope for this road. I think what has been raised a lot in Lembah Jaya, there is none, yes.
For Dusun Tua, earlier, the Honourable Member for Dusun Tua, who asked many questions about the issue of the Flood Mooring Programme. For information, as the Honourable Member is aware, the Flood Mooring Projects, most of these big projects, are under the financing of the Federal Government, to which we have applied. I have mentioned this matter, and I say it again: at the initial stage, it is indeed a priority under the current circumstances, roughly, water, yes, indeed a priority is placed on the Flood Mooring Project for the Langat River. There are 3 phases in total, involving a total cost of 500 million. Only the first, which has been approved and is in the implementation process, but the other two, we have received information that they have been moved down in priority. I hope and urge that the Federal Government will give consideration, because this area involves very many residents, so that it can be upgraded. At the same time, I have visited several places recently, and received feedback from JPS that some specific places can actually be, we look for short-term methods, or medium-term methods, to reduce the impact of this flooding. This includes the road at Batu 10, which I visited recently. I think it can indeed be done by upgrading the bank there. And the 10 million allocation, I have discussed with JPS, perhaps we will review it, we will find how we can start the works there. If we look at it, RM10.00, its ceiling, that is fine, we will see how. I give an assurance that we will find a way to help, perhaps we can look at drain contributions for us to use the allocation to help. That is what I say. The retention ponds, I have mentioned many times, these retention ponds, for everyone's information, it is not that we at JPS do not want to manage them, but of the 600 ponds that exist throughout Selangor, only around 160-odd are actually under JPS now. The process of taking them over takes time, it cannot simply be taken over just like that.
Later, if we are not careful, someone's land, once there was a case where we were sued, enclosed, trespassed, it has indeed happened. Status must be checked, handover must be done, engineering, drawings and so on must be done, the land status and so on must be checked, and we in the process, we indeed help JPS to continuously add to the number of these ponds so that they can eventually take over all the existing retention ponds, to facilitate maintenance works for this flooding.
Next, I, to accept the views of the Honourable Member for Meru, indeed we have done something, for example, the latest is at Jalan Shorea, Persiaran Shorea. Indeed we gave warnings, after notices, after notices, we did nothing, he still allowed cattle to roam until the road there was completed a year ago but could not be opened. So I had to take steps, and I brought it to the Exco Meeting, we approved that we take enforcement action, we catch these cattle. It is not easy, there are hundreds of buffaloes, there are 700, I do not know how many hundreds of cattle, so they roam here and there. So we catch them, we bring them to the pen, and we sell them, we do not return them. So after 2 or 3 times we did this, 20 cattle, 20 cattle, eventually he agreed to move, to move to another place. But at the same time, we provide places, we give opportunities, like, around Klang here, we give Olak Lempit. Olak Lempit is not for everyone, only for a few, who are around Klang only. Other places we have, there are other places that we are developing and that are under our plans. There are 85 cattle owners, according to our census, who raise these roaming cattle, 85 owners, about 4,000 cattle or more throughout Selangor. We have planned it, I have asked the Veterinary Department to prepare a plan for a 3-year solution to relocate all these cattle to translocation sites. If there is failure after that, then we will take drastic action to catch them, and also, to give them alternatives first. The Selangor Government is like that, we give alternatives first. If they are stubborn and do not want to, it will cause hardship, road accidents, even cattle that enter shopping, supermarkets, even visit hospitals, there have been such cases. So we give them the opportunity first for these actions. If they are still stubborn, then we have to take action to resolve these issues.
For Bandar Utama, I will study it later. I indeed understand the Flood Mooring Project is ongoing, but it takes time. And I understand that a major flood just happened there recently. Let us see how, the method, but it is rather difficult there because the place is rather narrow, the river is narrow but the water volume is large. So one other alternative is a flood wall. We want to build a flood wall, we want to look at it in the context of the overall planning, whether it is suitable or not. We cannot build a bank, because there is no more space, it is indeed congested there. I have visited and seen it, so suitability cannot be obtained. We will see how to resolve it for the short term.
I apologise to the Honourable Member for Ijok. It is not that we are treating anyone as a stepchild. We indeed allocated under the Sungai Buloh Flood Mooring Programme, RM42 million as well, indeed to resolve the issue, and it is now in progress. I know it is not yet complete, there are still spaces to be corrected for flooding in the area, but we will look at and study it. As for the road, we already have implementation, because this road is also prioritised, which ones are to be upgraded, which ones are to be built new, if not, our finances are limited for what we want. I have said many times in this House that most of our roads need to be upgraded because they have expired, and I have asked JKR to identify, in phases, which roads to upgrade. But it must be long-term planning to upgrade, otherwise we just patch, patch, it will never solve the problem. Moreover, lorries, we usually have overloading, overloaded, then followed by our soil, we add to it with the problem of soil, the soil that is peat, which is very soft and requires high costs for treatment, for the durability of this road, this is the major issue that we must face.
I also would like, I take note of what Kuang raised. I also received a love letter from him, and I will look at it from Jeram, from Kuang as well. I understand the question raised, I will look again at the issues related to Jalan Melati, which was mentioned earlier. Sometimes the real issue of this road, I want to inform all Honourable Members, the Honourable Member has two major issues on this road that are not technical. The first is utility diversion. Although we identify where utilities are underground, it is not difficult, we use GPR, very easy, we can identify what is underneath, water pipes, cable pipes can be identified. The problem is asking for utilities to be relocated, that takes time, sometimes a year. If at Wisma there near Jalan Cheras, the cable has still not been relocated for more than a year, because there are many constraints and so on. This is what often disrupts the progress of our roads, utility diversion. And the second is the issue of land acquisition if it involves taking over land. These are the two major issues that often disrupt, and we will review again to see what the real problem is there. I will obtain it and give focus to Jalan Melati in Kuang.
And also, what was mentioned by the Honourable Member for Bukit Melawati about the dangerous junction, I will also study and look again at what these issues are. I will handle this, Honourable Member, you do not need to raise this in this House, if you want to raise it, you can, but at other times, inform me, for me to take action. You do not need to wait for House sittings for resolution of these infrastructure-related issues, I will resolve them as best I can. I think time is already rather limited.
Question, Deputy Speaker
Seri Setia
Seri Setia, I did not answer. Was there a question just now?
Honourable Pandan Indah, I, just because my question was an interjection, it seems it was not answered.
It is not in my notes.
Yes, interjections like these are indeed rather difficult. My question was about how the other Honourable Members, like yourselves, are supposed to know the problem. We who are involved with roads under the federal government, so when we lodge a complaint the State Government will say it is under the federal government. So could you tell us how, in what way, we can resolve this problem?
I have already asked the Public Works Department (JKR) to prepare all the complaints or proposals we have regarding federal roads in Selangor. Wait, I will obtain them. I want to see how many complaints or applications we have submitted to JKR Malaysia for allocations for federal roads, and how much we received from that. I will take follow-up action on what the issues are, because there are too many figures and none of them are exact. I will bring this issue to emphasise it further at that level, to obtain its budget. It is at an early stage. I have met many times, it is limited, but limited means it will have a major impact on the State of Selangor, because roads like the Federal Hihgway, the main road, the street lights are also a problem, floods, and what is this, motorcycle lanes are also a major issue. So these things will cause disruption, and it is considered that the State Government does not care about what is happening on these roads. For the people, it does not matter whether it is a federal road or any other road. These roads need to be resolved, so this is the focus for us to resolve.
Kota damansara
Kota Damansara
Thank you. I am not sure whether this is the EXCO, or the EXCO for Religious Affairs, but only the Honourable answered about the surau in Pandamaran just now. In my debate, I mentioned the construction of two mosques, Masjid Kota Damansara II and Masjid Subang Bestari. Then I also mentioned the Sekolah Agama Menengah Tinggi Seksyen 11, Kota Damansara, and also the construction of the RRI temple, which is not in the answer. Thank you.
Let us give the EXCO for Religious Affairs the chance to answer, because otherwise he will have nothing to say, and I will also answer everything. However, regarding the construction of mosques and suraus, these are indeed under JKR, but the responsibility is with the Selangor Islamic Religious Department (JAIS), yes, under the responsibility of JAIS. In terms of technical implementation, yes, it is under the responsibility of JKR. So I ask that the Honourable EXCO answer later. So I think I have already, if there is anything not yet..
Sorry, what about the temple? Is there?
The construction of the temple, is it also under the EXCO for Religious Affairs, yes? Someone will answer later, do not worry. So I think that is all. If there is anything else I have missed, I will, I will contact you in writing and so on. Thank you.
I invite the Honourable Sungai Kandis.
Thank you to the Honourable Deputy Speaker, who has given Sungai Kandis the opportunity to respond to all the issues raised by Members of the House. There are six Members who have raised issues in their respective areas, and I will start with Pandamaran. I agree with Pandan Indah that although Pandamaran is outwardly regarded as anti-Islam, with communist influence and so on, it seems he is very earnest in championing this surau issue by putting forward a sum of allocation for refurbishment. However, after I checked with the Islamic Religious Office, both of these suraus, Surau Al-Hijrah and Surau Darul Muhhibbah, have not been registered with the Islamic Religious Office, and the committee concerned is advised to register with the Islamic Religious Office and ensure that the land status for the construction has been settled. Next, Taman Templer, although not present because she is still in the confinement period and was represented by Rawang, asked about Masjid Selayang Mutiara. But I believe Taman Templer is following this sitting. The development sponsor committee applied to build a new mosque on the waqf site of Ibnu Sod, namely a mosque site measuring 5,042 square metres. The application was approved by the Mosque Kariah Committee meeting on 10 March 2015.
However, we are informed that the Construction Committee started construction first without the knowledge of the JAIS. At this time, the construction of the mosque is facing some problems with the Selayang Municipal Council because it did not submit a Planning Permission Plan.
Regarding Masjid Selayang Pandang, the mosque intends to build a new mosque on the site that was granted permission by MAIS in 2018 and was approved by the Selangor State Mosque and Surau Governance Committee (JATUMS) meeting. However, in 2020, the Mosque Construction Sponsor Committee submitted an application to cancel the intention to build a new mosque due to lack of funds, and applied for approval to renovate and enlarge the existing mosque building. The application was approved by JATUMS on 12 August 2020. The Sponsor Committee is currently seeking funds for the renovation of the mosque.
On the matter raised by Kota Damansara, I, Kota Damansara, appears very earnest, he has raised this mosque many times, and I have given a more detailed answer for Masjid Kota Damansara II. The cost of the mosque for Kota Damansara II totals RM12.4 million, and this project will start in 2022, with funds totalling RM10 million, in 2023 RM1.4 million, and in 2024 RM1 million until the project is completed. As for Masjid Subang Bestari, this project costs RM12 million, and the allocation is also divided by year. In 2021, RM3 million, in 2022 RM3 million, and in 2024 RM3 million.
Then Sabak raised Masjid Badli Shah Parit 6 and Masjid Mohammad Parit 10, that is right. Both of these mosques applied for the construction of new mosques and were included in the RMK12 but were rejected, and the Mosque Committee was advised to apply for repairs and also to submit an application to the District Islamic Religious Office. Bukit Melawati raised the issue of Masjid Sultan Ibrahim, which does not yet have facilities for Persons with Disabilities (OKU), and it is also advised to the mosque management to apply to the District Islamic Religious Office to add these facilities or apply for an upgrade. And also to other mosques, it is advised that they provide facilities for Persons with Disabilities so that they too have the right to perform congregational prayers at the mosque together. So I think that is part of the questions raised. The others are issues related to mosques and related to schools. I think the EXCO for Education will answer. Thank you.
I invite the Honourable Batu Tiga.
Thank you, Honourable Deputy Speaker. I would like to answer several questions raised, especially from Taman Medan, which touched on PK15003 relating to Buildings, the Skim Ceria, which was informed that it needs some focus on the Honourable's area.
For the information of the Honourable, the Skim Ceria, or the one implemented, we actually look at the programme or apartments involving medium cost or lower-medium cost, which covers 1,182 strata developers, low cost, and also 730 lower-medium in the State of Selangor. But for the Honourable's information, we already know, we know the action before 2008, many squatter resettlement programmes were carried out, and in the end the development, many of which we see, was not well organised and planned. Therefore, I would like to read out a little here. Taman Medan is actually quite fortunate, because since 2010 it has received about 11 programmes that have been benefited by this Ceria Programme, because we see the places where it was implemented, whether repairing 4 lifts, we have each one, if we look at each programme or application from this Skim Ceria, most of them are lift repairs. And InsyaAllah I will provide the Honourable with the details of this application.
But for this august House, I want to inform you first that this Skim Ceria does not use Development Allocation, it comes directly from the State Treasury, but for 2021, it began to be included under Development Allocation. So to make it easier for the Honourable to
examine one by one, it is managed under the Skim Ceria Trust Fund under the Selangor Housing and Property Board.
That is related to Taman Medan, and the issue touched on or raised by the State Assemblyman for Sungai Air Tawar regarding the abandoned project of Rimau Indah Apartments, in the mukim and district of Petaling. Okay. Here I want to state, and I think the Menteri Besar's Office has already received the memorandum, but I want to give a little background because I was asked by Air Tawar about the low-cost apartment housing project Rimau, which was developed by Tetuan Rimau Indah Sdn. Bhd. It was supposed to be completed in 2004, but the developer was subjected to a winding-up order by the Court on 23 July 2009 and placed under liquidation, or Liquidator, with permission, namely Ferrier Hot Gasson MH Sdn. Bhd. now. The Land Office also carried out a land forfeiture due to the failure of the landowner to pay outstanding land tax.
So the State Executive Council (MMKN) Meeting No. 34/2017 approved that this project be sold by open tender with a reserve price to any developer interested in redeveloping this project, which is managed by the Land Office and also the Selangor Land and Mines Office, with the condition in the tender that the developer must make a comprehensive settlement with the original buyers before any works are developed. So, meaning the Liquidator is already there and there is a Court Order, but now the issue is that at this time, so far, we see that they have submitted a proposal for a Restructuring Scheme, but we see here that this Scheme cannot be implemented until the Liquidator fully identifies all 331 buyers. For now, the Liquidator has only been able to hand over or identify 179 persons out of the 331 buyers who can be identified.
So the State Legal Adviser's Chamber and PTGS will re-examine the Liquidator's proposal and will provide comments from the technical legal aspect concerning the land before any proposed solution is brought up to the State Authority. So for the information of the Honourable Sungai Air Tawar, actually, Tabung Tepat, I want to inform you, perhaps for the information of other Honourable Members too, the Tabung Tepat that was established is not for the purpose of rescuing abandoned projects, but Tepat is a fund established from 2015, a one-off from the State Government of Selangor, which is for infrastructure restoration programmes such as drains, roads, water supply, septic tanks and so on. Not to rescue existing development projects.
So that is my response to Sungai Air Tawar. Regarding the Honourable Kota Anggerik who asked about how to upgrade old housing, especially those located in Seksyen 6, 18 and others, or Seksyen 8, so I want to say here that actually the State Government specifically has no detailed plan yet. Yes, there is no detailed plan yet for these three areas. However, there is a desire, or we have a desire to hear from former developers or to state this intention. Yes, so I am pleased to inform you that the State Government has actually prepared. We see many cases like this, not only in Kota Anggerik or Shah Alam, Batu Tiga and so on, but because of the many works or matters
like this that have arisen, on 30 June 2020, the recent State Planning Committee meeting approved the guidelines.
So there are three major matters, Honourable Members. First, for cases of these old houses or housing, we will take three actions, or categorise them into major actions:
(i) Urban Re-development, in English we call it Urban Re-development. It means that the area will be holistically changed in its physical structure. Meaning, we will do the whole, the meaning of this plan can be done, but this development involves site clearance works, demolition of buildings, possibly land use changes and so on. So this may involve the whole thing, as was once done in a project, namely the Datum Jelatik project in Ampang by PKNS (Selangor State Development Corporation). That is called Urban Re-development.
(ii) The category of Urban Re-generation, or Urban Re-generation with permission. Restoration, which is a restoration of an old, obsolete or abandoned site through repair of old buildings. Construction of new buildings and provision of infrastructure facilities without destroying the entire design, structure layout or function of the area, as was done before under Bandar Baru Klang, the Hotel Whyndam itself was redeveloped.
(iii) The category of Urban Re-vitalization, or Urban Re-vitalization with permission, which is restoration that does not involve changes to the building structure. It includes works such as beautification, repairs, upgrading, providing recreational facilities, landscaping and perhaps also the Ceria programme.
So there are three major programmes, and I request the Honourable Members, if any one category is suitable, we can submit proposals which we may look at one by one to determine which of these old housing projects we can manage well within the next few years. So that is a brief response to the Honourable Kota Anggerik. It is not easy, because if we want to do this, I remind you that it requires the unanimous consent of the house owners. It is not easy, but I am confident that the assistance or facilitation from the Honourable may enable it to be done well. So that is what was asked by Kota Anggerik.
Next, Kota Damansara raised an issue relating to the PPR Kota Damansara. Likewise, I see the history or background of the allocation that has been proposed. In fact, Kota Damansara, since 2015, there have been many, many programmes implemented under PHSB, or Perumahan dan Hartanah Selangor Berhad, and this year alone the government has channelled an allocation totalling RM443,839.00 for repair and upgrading works on the lifts of PPR Kota Damansara. What I want to say here is that most likely we, the Selangor government, give or take note that these works are under the management of PSHB, but we also request that there be another programme, namely a programme to ensure, I think the programme is done under the Honourable Seri Serdang, or our neighbour, our family, something like that. That also needs to be publicised, and we want those who live in any PPR under the management of the State Government to also understand the importance of looking after public property. Regarding the mention of the PPR, from the Honourable Seri Setia who spoke about Lembah Subang, actually PPR Lembah Subang is still under the federal government. There was a proposal for KPKT, the Ministry of Housing and Local Government, to hand it over to the Selangor Government, but the Selangor Government gave several responses that if it were to be handed back, what matters could be agreed to, and these matters have been conveyed to KPKT, and I think to this day I have been informed that the Selangor State Government is still waiting for the Minister's decision. But the views from Seri Setia, can we look into the issue relating to this PPR Lembah Subang, I think I will look at it case by case on how we can implement this. But I want to ask, I may ask Seri Setia, do you agree or not if the policy allocation of RM85 million is used to help the residents of Lembah Subang? So that is better.
Thank you, Honourable Batu Tiga.
Just answer agree or not.
I agree. I agree very much.
Duduk balik. Setuju. Jadi kita kena mendesak sama-sama supaya duit itu lebih baik atau lebih efisien kalau dibelanjakan pada tempat-tempat rakyat lebih terkesan dengan pandemik ini. Yang akhirnya tentang isu berkaitan dengan usahawan. Sebelum itu saya akan bekalkan juga kepada Kota Damansara senarai program-program yang telah di baik pulih sebelum ini. Tentang isu usahawan saya nak ucapkan terima kasih kepada Honourable Sentosa dan juga Honourable Sungai Ramal yang bertanya tentang beberapa program khususnya bagaimana program latihan, geran dan sebagainya boleh dilaksanakan. Honourable Sentosa cadangkan supaya latihan ditukar terus kepada geran. Tidak diwujudkan lagi ataupun atau tidak diberikan lagi tumpuan kepada latihan tetapi Honourable Sungai Ramal minta ditingkatkan pula geran. Jadi ini perkara yang berkait sebenarnya. Jadi saya ingin nyatakan di sini sebenarnya Stanco usahawan kita merasakan latihan adalah satu perkara yang paling asas yang perlu diberikan. Kalau kita bagi banyak peruntukan program untuk pemberdayaan usahawan itu akan ada sedikit kepincangan. Kadangkala kita rasa usahawan itu selalunya merasakan dia rasa kalau dia dapat peralatan ini dia rasa dia boleh tingkatkan dia punya business sedangkan masalah besarnya adalah kewangan atau pun pengurusan kewangan atau pun untuk beliau atau mereka memahami perniagaan
atas talian dan sebagainya ataupun mungkin packaging banyak perkara yang sebenarnya kita perlu tengok dan akhirnya kita perlu melatih mereka ini supaya mereka dalam ekosistem seorang usahawan yang betul. Jadi saya bersetuju dengan Honourable Sungai Ramal bajet ini mungkin perlu ditingkatkan tetapi saya ingin bacakan di dalam sini bahawa sebenarnya di bawah PKPK yang ada boleh saya bacakan supaya semua boleh maklum. Honourable Members semua sekali. Semua geran yang telah diperuntukkan keseluruhannya di dalam bajet tahun ini adalah sebenarnya sebanyak RM6.8 juta. Di mana PK03001 di bawah dana usahawan mikro Selangor sebanyak RM2.25 juta. Geran pembungkusan PK03004 sebanyak RM550,000.00. PK08001 Blue Print sebanyak RM2 juta. Kita ada program-program SITHAM di bawah Hijrah sebanyak RM500,000.00. Di bawah pertanian, PK02001 geran asas tani sebanyak RM1.5 juta. Dan juga saya rasa selain daripada itu banyak lagi program-program yang dibuat tetapi untuk yang berada di dalam buku bajet kita ini saya bacakan tadi sebanyak RM6.8 juta. Saya rasa kalau kita ikut permintaan memang Selangor berdepan dengan masalah ketidakcukupan ini sebab Selangor dapat melahirkan usahawan ataupun peniaga-peniaga yang teramai di Malaysia. Kalau kita ingat dalam tahun sahaja kita boleh mencecah 5000 itu senang-senang sahaja. Jadi 5000 ini peruntukan itu pastinya tidak akan cukup kita sediakan sebab kewangan daripada kerajaan begitu sedikit sebab itu kita masih lagi Kerajaan Selangor sentiasa bekerja sama juga dengan pihak-pihak agensi pusat untuk memastikan geran-geran ini dapat kita peroleh juga dan kita bantu semua usahawan untuk dapatkan geran-geran yang sedia ada. Jadi cadangan daripada Sentosa supaya PBT juga terlibat dalam mungkin boleh memberi geran-geran ini jadi saya rasa insyaallah saya sokong sebenarnya kemungkinan besar pihak PBT juga boleh melihat mungkin membantu peniaga-peniaga kecil untuk mula memberi sedikit geran-geran yang dalam bentuk kecil-kecilan untuk membantu peniaga-peniaga. Jadi itu serba sedikit yang ada tetapi akhirnya saya ingin maklumkan di sini fokus tahun hadapan adalah lebih kepada memastikan kita dapat melaksanakan latihan dalam memastikan usahawan kita adaptasi mereka kepada perniagaan atas talian. Jadi digitalization ini amat penting untuk dilaksanakan. Dan sebagaimana yang dibimbangkan oleh Honourable Sentosa, bagaimana kita patut mempertingkatkan lagi program-program Hijrah terutamanya untuk memastikan bahawa rakyat Selangor tidak terjebak dengan Ah long dan sebagainya. Saya rasa Selangor satu-satunya negeri yang telah mewujudkan satu skim khas di mana kita telah nampak perkara ini lebih awal lagi. Sebab itu saya nampak alhamdulillah seawal atau Skim Pinjaman Hijrah ini sebenarnya adalah satu penyelesaian kepada mereka yang terpaksa terjebak dengan isu peminjaman ah long gadaian dan sebagainya. Sebab itu ingin saya bacakan di sini sehingga kini Hijrah Selangor telah berjaya menyalurkan pinjaman sebanyak RM517 juta kepada seramai 53,958 usahawan. Kalau dulu mereka ini teraba-raba mana nak dapat pinjaman, mana nak dapatkan modal untuk tambah perniagaan sekarang ini Hijrah telah dapat memberikan perkara ini dengan baik. Insyaallah. Jadi itu sahaja Honourable Deputy Speaker. Saya menggulung soalan yang ditanya. Terima kasih.
I invite the Honourable Member for Kota Kemuning.
Thank you Mr Deputy Speaker, I would like to refer to the question raised by the Honourable Sentosa regarding the issue of crematoriums. The State Government, through the Non-Islamic Affairs Committee, has the role of helping to consider proposals and plans for the construction of crematoriums that are applied for at the local authority (PBT) level. The construction and provision of crematoriums is based on certain considerations such as local needs, technical approval, surrounding residents' factors and so on. At present there are 8 crematoriums in five local authorities, namely 2 crematoriums in Shah Alam operated by the private sector, 2 crematoriums in Petaling Jaya and Hulu Selangor and one crematorium in Subang Jaya and Klang. There are 2 crematoriums that are under construction, namely the integrated crematorium in Pekan Sepang and the crematorium in Bandar Puncak Alam, Kuala Selangor. For crematoriums under the administration of MPKj, MPKj at this time has still not received applications from the consultants for the construction work of the crematorium in Kajang. Therefore, Honourable Sentosa, I agree with the proposal that every PBT needs a crematorium, these matters are indeed being discussed and are being worked on in that manner. And referring to the Honourable Sijangkang who expressed concern about irregularities when we deliver death aid (wang khairat kematian) money, I am not very sure there are irregularities, but perhaps there is something, there is no delay or anxiety in the timing of delivery. Perhaps there is a reason when I was...
Thank you Honourable EXCO member. I think there are a few isolated cases, including the issue that happened in Subang Jaya as an example, carried out by an assistant to a State Assemblyman. I think these are among the matters where this experience must become a lesson for us on how this process can be improved. The money to be used by the family members can be managed well and this technical issue has happened as well as possible. Thank you.
Thank you Honourable Sijangkang. Indeed if it happens it is more about the service centre itself. However, I have only just received the responsibility to look after this matter, I will raise this matter so that it is more transparent and also responsible in delivering the allocation, any input from the Honourable Member is greatly appreciated. Returning to the Honourable Kota Damansara, who stated the intention and thanked for the Workers' Empowerment Stanco. I am indeed very grateful to the Most Honourable Dato' Menteri Besar because there is the existence of a very new Workers' Empowerment Stanco and most importantly I too was searching for where the allocation was, and finally I received an answer from UPEN Agihan stating that RM1 million has been allocated under the
miscellaneous account. There is an allocation. However, the intention and also the proposal from the Honourable Kota Damansara that a committee be established. That was indeed my initial intention. I am in a situation where, because the existence of this Stanco is very new and the time is close to our budget, this session, I believe that in the coming session we can get a more detailed answer on the matter of the committee and also how we can allow or obtain input from all the Honourable Members of this House so that it can be further strengthened as requested, so that the committee under this workers' empowerment is more responsible, open and also transparent in helping issues related to workers. One more thing, after being raised by the Honourable Kota Damansara, namely the allocation for temples, I need to state here that the allocation is actually a limited allocation. There are many applications, so every application must be submitted with all complete documents within a specified time. If the Honourable Member makes an application, I also cannot do it. It must be sent to the office with full documents. That is full documentation and if there is an allocation we can consider all their applications. One more thing, the Honourable Semenyih stated regarding the community leaders of the Indian community that the allocation be used, indeed the existing allocation is RM10 thousand for the year 2020, this year, however I understand that for 2021, the coming year, not only the allowance but also the allocation may be harmonised with the traditional village heads. Therefore all programmes will be carried out together with the state constituency ADUN. I believe that is what I wanted to answer. Thank you Mr Deputy Speaker.
I invite the Honourable Sungai Tua.
Thank you Mr Deputy Speaker. Honourable Members all who asked the Honourable Hee, has it not yet? Eeh.
Please, Honourable Kajang.
Mr Speaker, I want to answer several questions raised by the Honourable Members during the debate.
Mr Deputy Speaker, I would like to interject at this moment to ask something, may I? I want to ask for permission from the Honourable Kajang first. May I?
Silakan. Silakan.
Okay. Honourable Kajang, I think before the Honourable makes the winding-up speech I want to ask, what
is the opinion of the Honourable Kajang on the pollution case that happened today? 24 hours after the amendment to the LUAS Enactment was passed by this House. I want to know what actually happened? I hope the State Government can give a satisfactory answer.
Thank you to the Honourable Bukit Lanjan for being very concerned about the water problem. I regret to inform that the SSP1, 2 and 3 Rantau Panjang Water Treatment Plants had to be closed because of odour pollution that seemed like solvent. At 12.20 the Rantau Panjang Water Treatment Plant (LRA) had to be stopped, and after that at 1.00 pm the LRA, SSP1, 2 and 3 also had to be closed. Until now they are still closed, and the efforts carried out by LUAS, Air Selangor, the Department of Irrigation and Drainage (JPS) and also the Department of Environment (JAS) found that the location polluting the Selangor River is from the Indah Water plan.
The location is at Taman Velox and this happened in Rawang after Sungai Gong. After the Sungai Gong pond. So, this is a place that we have identified, after that I will go down to inspect the problem where there was also discharge of a type of oil or solvent substance into the manhole or directly into the IWK. So, that we must confirm. That is all.
So, it seems that there are people this morning who deliberately dumped solvent chemicals into the IWK facility after we passed the LUAS Enactment, the amendment to the LUAS Enactment. Is that right?
For the information of the Honourable Bukit Lanjan. At 2.00 am. LUAS still detected TON readings, the TON reading at Sungai Gong was 0 TON. At 4.00 am, Air Selangor also detected 0 TON at Sungai Gong. At 7.00 am, Air Selangor also detected 0 TON at Sungai Sembah because all the water would go to Sungai Sembah after that. 7.00 am. Where this happened after between 7.00 and 10.00 am. We suspect there was sabotage. (table thumping). So, we will make a police report. We will make a police report and find out who is behind it. OK. I think I have answered all the questions. (Laughter). That question is what the Honourable needs to know. These are early information but let us relax a bit for now.
I want to answer the question raised by Banting regarding the Kuala Langat Selatan Forest Reserve. The area involved with agricultural cultivation is approximately 3,463 hectares, where out of the total area of 3,463 hectares, 454 cultivators are involved with an area of approximately 1,763 hectares, that is 1,700 hectares more have been cleared and planted with oil palm or contract crops and there is no record of cultivators. The list of these cultivators is as in table 1, which is long. I will give it in writing.
The crops cultivated are contract crops such as banana, galangal, turmeric, chilli, tapioca, maize, dragon fruit and also others. Apart from contract crops, there are also oil palm crops that have been cultivated by settlers. Among the problems faced in the regularisation process today, it is not that we do not want to do regularisation, we have twice submitted a paper to MTES, there are different views and problems that we face because this area is too large and those involved are also many, 454. They not only planted contract crops but also planted oil palm, that is the most troublesome problem for us.
Where we want to inspect enforcement. There has been conflict from the cultivators in accepting the method of solution proposed by the Forestry Department. Therefore, further discussions are still being carried out with the cultivators to obtain the best solution and in line with the wishes of the State Government. There is an issue of fights between cultivators because of competition over settlement areas.
JPNS has submitted the MTES working paper, regularisation of land settler issues, forest encroachment and open burning without permission in part of the Kuala Langat Selatan Forest Reserve to obtain views and comments from the Selangor State Legal Adviser's Chambers. And JPNS would like to advise that the granting of the Kuala Langat Selatan Forest Reserve Use Permit be postponed first, expected to be completed in December 2020. And based on the comments of the Selangor State Legal Adviser's Chambers, the Selangor State Forestry Department (JPNS) recommends that an integrated regularisation operation be carried out in the Kuala Langat Selatan Forest Reserve. So, I hope this has answered the question from Banting, yes. Any more?
Yes, yes, ask for clarification. Thank you for the information from the Honourable EXCO member because this is the latest, the most recent information. However, what I can observe or want to propose is that the consent or issue emphasised by the farmers is those who cultivate contract crops. Such as chilli, galangal, ginger and so on. These are the ones who are actually categorised as those involved in TKPM or under the Selangor Agriculture Department.
If it involves oil palm crops, I think there is no obstacle or problem for the Government to take enforcement action because oil palm is not considered as agriculture. It is actually a form of commodity and actually I think if it is palm oil, I think it can be removed from this discussion because it does not involve what, farmers who apply for a Use Permit. Although perhaps palm oil, because I know palm oil has its procedures in terms of land titles and so on. Registration and so on it is under it's an entire host set of different thing all together. So I
humbly request the Government to perhaps expedite by removing this palm oil portion from this regularisation or the granting of this permit.
Not only oil palm plantations, Honourable Member, there are 6 large companies planting on a massive scale. They obtained permits from the Government before, before. Now the Permit Penggunaan (Use Permit) is not being extended by us. So, it is not only small farmers' plantations but also involves the Orang Asli. It also involves large companies. But we will resolve this as quickly as possible.
To answer the question raised by Sentosa. Sentosa is here? Ok. Up to now, the total number of seedlings at the nursery site of the Selangor State Forestry Department (JPNS) is 21,100 seedlings, consisting of Dipterocarp tree species - 12,500 and non-Dipterocarp tree species - 6,000. Rare tree species number 2,500 and herbal species 100. Apart from these seedlings, they are used for planting projects and for the restoration and enrichment of forest areas in the State of Selangor.
However, the Selangor State Forestry Department (JPNS) has no objection if the Honourable Member requires these seedlings, but this is subject to stock and also the number and species of seedlings required. If the stock of seedlings is sufficient, the Selangor State Forestry Department (JPNS) would be very pleased to supply the seedlings requested by the Honourable Member for the planting programme.
To answer the question raised by the Honourable Member for Pelabuhan Klang, no, I do not need to answer. Is he here? (Laughter). As for the Mangrove Swamp Forest Reserve. Mangrove or swamp forest is an effective natural barrier to prevent coastal erosion from occurring, which has occurred. Every year, erosion along the coastline has caused the Mangrove Swamp Forest to be threatened with a decline in value. The Mangrove Swamp Forest in the State of Selangor consists of Permanent Forest Reserve land, State Land and Alienated Land.
There are several factors contributing to the decline in value in the Mangrove Swamp Forest area, among them being strong wave erosion, illegal extraction of mangrove timber, unplanned development in coastal areas, and others. Cases of illegal extraction of mangrove timber in Selangor have shown a decrease in the number of cases over the past 5 years. This is due to the integrated and coordinated cooperation among enforcement agencies, such as the APMM (Malaysian Maritime Enforcement Agency), Marine Police, the MACC (Malaysian Anti-Corruption Commission) and others.
The awareness and concern of the local community also contributed to the success of enforcement operations carried out by the Selangor State Forestry Department (JPNS) in curbing this illegal extraction of mangrove timber.
The JPNS takes the erosion issue occurring in the Selangor Mangrove Swamp Forest seriously, based on observations of soil erosion in the Mangrove/Swamp Forest along the coastline, especially in Kuala Selangor and also Kuala Langat. This erosion requires attention and improvement measures from all parties. Based on this department's records, more than 1,000 hectares of Mangrove Swamp Forest Reserve in this state are affected by erosion.
Every year, the Selangor State Forestry Department (JPNS) carries out various programmes, restoration in the Mangrove Swamp Forest involving the replanting of coastal trees, either by the department or together with the public or communities. The JPNS always welcomes the involvement of government agencies, private companies and NGOs in efforts to rehabilitate these Mangrove Swamp Forest areas by holding CSR programmes.
Based on the JPNS's monitoring in the field, the Mangrove Swamp Forest areas that are replanted require adequate preparation in terms of constructing structures that can block and reduce the force of waves hitting the coastline. This will indirectly help the seedlings that have been planted to grow and thrive. Okay. To answer the question raised by Kota Anggerik about forests as well. The Selangor State Government, through the Selangor State Forestry Department (JPNS), has taken appropriate action to ensure that the total area of Permanent Forest Reserve is always maintained. In this regard, the area of Permanent Forest Reserve in the State of Selangor has successfully been increased to 205,207.39 hectares, or equivalent to 31.5% of the state's area at present.
Secondly, the State Government is also very concerned about the importance of forest reserve areas throughout the State of Selangor. Therefore, a total of 44,543 hectares of these forest areas have been gazetted under the Water Catchment Forest class under Section 10 of the Selangor State Forestry Enactment (Application of the National Forestry Act) 1985, namely in 1999 and 2009. Meanwhile, a total of 130,364.15 hectares of Permanent Forest Reserve in the State of Selangor have been gazetted as the Protection Forest class, which covers Protection Forest for Land, Protection Forest for Wildlife, Virgin Jungle Reserve, Recreational Forest, Education Forest, Research Forest, State Park Forest, and Forest for Federal Purposes.
Generally, this Protection Forest class is not intended for commercial or logging purposes. The Selangor State Government has also improved Section 11 of the Selangor State Forestry Enactment (Application of the National Forestry Act) 1985 in 2011 by imposing a condition to carry out a public inquiry for any Permanent Forest Reserve area that is to be degazetted. In addition, the degazettement of the Permanent Forest Reserve involved must be replaced with an area of equivalent value.
The process must be carried out simultaneously to further strengthen this situation. The Selangor State Government has also taken a proactive step by approving the Investigation Regulations Amendment 2014 at the 26th State Executive Council (MMKN) meeting, 2020, on 22 July 2020. For the information of the House, Selangor is the first and only state in Malaysia to have enforced the Conditional Public Inquiry Regulations in the process of abolishing or degazetting Permanent Forest Reserves.
Two (2) more short questions to answer the question raised by the Honourable Member for Kota Damansara. Tourism Selangor has already promoted the Kota Damansara Community Forest Reserve in promotional campaigns such as the publication of tourism articles and promotion on social media as one of the tourist destinations with an eco-natural concept and recreational place. This area is also an attraction and the main nearest area for hikers to carry out hiking training, especially residents around the Klang Valley.
The State Government welcomes the proposal given by Tourism Selangor to conduct a technical visit session on tourism products involving several related agencies such as the Petaling Jaya City Council, UPEN Tourism Section, the District Land Office and Petaling, as well as MOTAC Selangor, to the area as proposed by the Honourable Member to carry out an audit session of tourism products.
This follows the guidelines that have already been set to look at the potential to improve facilities there, specifically for tourists. To answer the question raised by Semenyih, yes, Honourable Member for Semenyih, are you here, yes? For the information of the Honourable Member, any work to upgrade infrastructure in Orang Asli village areas must be submitted in writing and sent through the District Land Office to be checked and studied for suitability.
In addition, the state government has also taken note of the proposal of the Honourable Member for Semenyih regarding the allowance and special allocation for Tok Batin of the Orang Asli, and will consider this proposal. For the information of the Honourable Member, for the Kachau Dalam and Kechau Luar Orang Asli Villages, the road is located on privately owned land. So it is difficult for us to repair, and we will discuss with the company concerned for immediate repair, because this has arisen for a long time; we must resolve this issue. For the time being, we are still in discussions with the company. Thank you.
Honourable EXCO, regarding the fund, the Sagong Tasi Fund.
The Sagong Tasi Fund is under education. The Most Honourable Member will answer shortly.
I invite the Most Honourable Member for Sungai Tua to give the answer.
BismillahhiRahmanirRahim. Thank you, Deputy Speaker and all Members of the House. Should I continue first or extend directly? Do I ask for a ruling now?
Proceed to the Motion.
Mr Speaker and all Honourable Members, I would like to move a motion which reads as follows: Whereas the House sitting today, pursuant to Standing Order 11 of the Standing Orders of the Selangor State Legislative Assembly, shall be extended until 5.30 p.m.
Mr Speaker, I second the motion.
Honourable Members, this motion has been seconded, and I put it to the House for agreement. Honourable Members who agree, please say Yes. Honourable Members who do not agree, please say No.
This motion is agreed to.
Thank you, Honourable Members. I would like to answer several of the questions that have been raised and several issues that have been brought up by all Honourable Members, especially regarding development funds.
And once again, in this House we confirm that the Selangor State Government has allocated around 47% of our budget for expenditure or development budgets, and this shows the state government's commitment to balancing between the administrative management processes of the state government, whether from emoluments, administration and management, and also development that is characterised by development for the people.
Repeatedly, I have heard during the previous debates, as if the state government does not allocate, but when I compare with the "federal", the "federal" only allocates 21% for development budgets compared with us
allocating 47% compared with the federal government, and this shows the state government's clear commitment that this development budget and development expenditure is a significant one for the year 2021 at the very least, for the course and life of the state government and state government expenditure.
Honourable Members, I would like to touch on what was mentioned by Hulu Kelang. Previously, perhaps in the last term, or two terms before, we debated these development motions clause by clause. And sometimes we were rather mixed up with B or with management.
At that time, the management at that time, the management of the House especially, the Speaker at that time to consider, sometimes we missed out, one development fund and so on, and in the end we could not discuss it.
Therefore, now, clause by clause, that is only for management and development, gentlemen, Honourable Members, can check for all and can debate it in the form of a motion and also discuss it in more detail, and I see this method is better because we can separate between B and P and so on.
And we are no longer trapped by the meeting rules, the rules of meeting business that sometimes delay and waste our time or take away our opportunity to speak in this august House representing the voice of the people and the voice of the community at the grassroots level.
Gentlemen, Honourable Members, I would like to mention first here regarding Smart Selangor.
Smart Selangor has 12 domains and we have 12 indicators, and the indicator method and indeed Smart Selangor is something new. In the world, there is no formula yet that, that "intake" concerning "smart city", let alone "smart state", and I can consider that we are the first state that is trying to become a "smart state".
In other places they become a "smart city" or in smaller "localities", with this rather too big ambition, our challenge is certainly great. In the presentation of the previous budget, I mentioned that our aspirations have achieved 40% of the 12 benchmarks that we have set and developed.
However, I take note of the proposal given by Hulu Kelang that it is not only a "top down" process but also refers to a "bottom up" process where we receive feedback from the people and
with the establishment of STANCO "Smart State" or "Negeri Pintar" by 2025, we will coordinate all agencies.
Previously SSDU was the parent body that would process, we had the "Smart State Council" with permission, or a body that sits twice a year at most, but this time with STANCO, we can see action by action, plan by plan, project by project, and represent the Local Authorities.
And from last year onwards, or from 2020 onwards, the 2020 budget has stipulated that this "smart state" must be shared in its role, function and allocation by the state government's subsidiary companies, by the state government and also by the Local Authorities so that all these important "stakeholder" agencies can function and meet the hoped-for aspirations.
In the 2020 budget, I targeted RM50 million for year by year up to 2020, 2021, 2022, but because of COVID-19 and what I mentioned, our way of living in the COVID-19 situation, digitalisation became the solution and the method, we increased it to RM300 million with the commitment of the state government's subsidiary companies, and we requested the commitment of the Local Authorities to accelerate our steps towards the "Smart State" by 2025.
Not only that, but part of our effort, living and also together with COVID-19 does not mean until a vaccine is discovered or this disease disappears by itself.
Therefore, we are not only standing on the "blueprint" that we made in 2016, but we have also completed what is called the "action plan".
More than 50 "action plans" have been outlined by the state government, starting from the "blueprint", the policy framework, followed by the "action plan", and followed by project after project that we will outline.
And I hope that after this, SSDU or the state government can outline and explain what projects one (1), two (2), three (3), four (4), five (5) we want to carry out, and once again I mention that there are no particular benchmarks outlined in the world for this matter.
Each has a different method. Sometimes they "claim, we are the Smart State". I was invited and I went to Casablanca, some time ago or two (2) years ago, and when we look, the difference between Casablanca and us is very great, but they have already "claimed Smart State". We went to Jakarta, Jakarta also wants to "claim as a Smart State". We went to Singapore, they do not say they have a "Smart State", they have a "Smart Port" as an example, but its life appears more "smart", more intelligent compared with other places.
Therefore, these benchmarks, we determine them, we set them, and we hope to achieve them, because we are "pioneers", and I see that from the federal level since 2018, they have begun to draft frameworks and so on, but we started earlier in 2015.
Clarification. I will describe it this way: we have, we have carried out IPR, the State Assemblyperson's Office is supported by companies that run state government programmes with its coordination. Previously we had SMUE, all those bodies. I would describe that when we do this "Smart State", "we are supported by" the ADUN is not separate. The ADUN is one "team" assisted by one platform shared by either UPEN or the House to provide "support" from the very beginning. Is that the picture?
Hulu Kelang, regarding the application, indeed at this time, as the Honourable Member for Kota Kemuning mentioned, we are in the process of completing SSIPR. What is SSIPR?
SSIPR is a compilation of a "database", all the information on our IPR programmes. That is why we have figures: 1.1 million people's recipients across the state of Selangor. By the end of this year we will actually complete it, and we will begin to align it with the Service Centres, including how our "Jom Shopping" processing works, our SMUE process, and the "database" whose "dashboard" allows me to monitor the daily movements of our IPR participants, whether from the Skim Air Darul Ehsan programme through to Didik Anis, Cikgu Anis and so on. Or the matters involved include, among others, the Micro Entrepreneur Fund, HIJRAH and so on.
At present, there are about 10 or more that have "gone online", yes, or have "gone live online", but not all are complete yet. When everything is complete, we will work together. Moreover, at the SSDU level, with your permission, there is also a programme called "COOL", but it is not yet mature enough, not yet mature enough.
I mentioned in the previous winding-up speech that for this "Smart State", at this point we have actually only reached a stage of analysing data called Big Data Analytics, where at this time we can only see trends and projections. SELANGKAH, for example as well: only after obtaining more than 11-12 million numbers can we obtain those trends.
And from that we will determine the direction of life, and we will align it. Indeed, its construction at the initial stage was rather "top-down",
or from top to bottom, but by now we have obtained some of the data managed for operations through the Service Centres and so on.
That concerns the "Smart State", which I believe I have already answered.
Honourable Members, some also asked about allocations for schools, or the allocation for, which was raised by Balakong. Why do we want to allocate again for next year when we have not yet handed over this year's allocation?
As everyone knows, we actually planned to deliver this programme as early as March and April, but we postponed it to August, due to the Conditional Movement Control Order, rising cases and certain other issues at this time. For everyone's information, this year there are not two "sessions", but only one session.
I have discussed with the Honourable Member for Kajang and the Honourable Member for Kota Kemuning. We have actually already handed over the funds now, directly through accounts to the schools concerned, even though there is no schooling, because we are confident that with these aids we can resolve the issues that have arisen. At present, there is about, there are some, not many, RM200 to RM300 thousand only.
Perhaps we can see the new lists, which are not many, not many, almost all of them, not many when added to the overall RM24 million. We have only a little more left, but all those applications have been reviewed and we have begun to hand them over from the end, from October onwards, which we have always marketed, because previously I had planned to personally attend the Chinese National-Type School, personally attend the Tamil National-Type School, personally attend the National Religious School, but unfortunately the schools are not in session. So how can we go to school? Later we will be criticised again for not following the SOP and so on. Therefore, we have distributed, we have given it to the schools concerned for the needs and livelihood of the people and the broadest community.
Honourable Members,
In addition, regarding the education matter just now, I heard yesterday that the Honourable Member for Kota Anggerik raised the need for online learning for religious schools, schools under the management of JAIS. For the information of everyone, especially Kota Anggerik, in the four MITS and 11 SRAI, access is now being given for self-learning through the i-Learns portal ID, funded by the state government. We have already done it through the MITS and also the 11 Integrated Religious Primary Schools under the management of the Selangor Islamic Religious Department (JAIS). And that is also what was inspired by my speech at the Budget Presentation a few weeks ago, which stated that we want to look at the People's Tuition Programme also through a digital platform, because this is part of the process compared with learning online or with the physical methods we have now.
I would like to touch on Semenyih. Semenyih raised the matter of Sagong Tasi, whose figures so far are indeed rather low. I can say below 10. I have the figures wrong, but in the report we provided, the figures are indeed rather low. That is why, starting from 2020, we do not limit Sagong Tasi only to schools or for education at the tertiary level, or at higher learning institutions or educational institutions. We have spread and extended it to secondary schools for outstanding students, for children among the Orang Asli community. Moreover, we are also trying to consider the technical and vocational institutions, because perhaps there is the best space and room for them to pursue and obtain a good and quality education, and so that they are not left behind by the current of development and progress in the State of Selangor.
Honourable Members,
I now turn to Banting, which proposed that village heads, local authorities (PeBT), councillors and so on be included as part of the digital friends that we want to implement. The purpose of this digital friends programme is transformation, of which most of the group will certainly be university students and also pupils. Therefore we will train the university students themselves and the pupils. Besides that, there is another group, namely the B40 group, who need it and who may have been left behind. Some of the B40 already understand, already know. So there is no need to teach them again. But perhaps in rural areas or perhaps in areas where they are left behind and understand less, especially senior citizens and so on, we also need that group. Usually these people are more comfortable with their peers or their age mates to shift and undergo transformation towards more digital living. And as I mentioned, digital friends will train this digitalisation and will be assisted in completing the network or chain for the process of delivering data for the people that we prepare, and that data, once again, we will limit to education and also limit to entrepreneurship for the sustainability of livelihood and the sustainability of education that will run online or in the online mode.
Honourable Members,
There was also a question raised regarding the development of the people's minds, particularly by Bukit Melawati. I would like to state here that overall about 13% is used from the people's mind development fund
for management. What was mentioned is the expenditure on editorial operations and, secondly, maintenance of the communication system. 8.8% for editorial operations and 4.8%, about 13% more is used for 13.6% for processes or matters involving management, editorial and also maintenance of communications. The rest is to fill the state government's information programmes. Most of it is through printing and distribution of Selangor Kini, which is distributed to the people, including in digital form, IPR and state government messages. This covers, among others, billboards and also displays in electronic form and in permanent form, and the Selangor TV programme, about RM300,000, a figure which is actually less than 4%, and also one item we have included together is the Selangor Kini Literary Award Programme, which we named the Selangor Literary Award, which gives recognition, the amount being rather small, about RM225,000.
For everyone's information, we have printed about 200,000 every week, and there are 52 editions. 52 editions, and also every quarter there are 4 additional special editions (a total of 56 editions of Selangor Kini). Besides every week, we have four special editions, for Merdeka or Hari Raya celebrations, or we will issue one for the Budget. Apart from that, there is also the Selangor Journal publication, 70,000 copies for each (once a month). We also have a Mandarin version, 70,000 printed (twice a month, every two weeks), with permission, twice a week, and also a Tamil edition called Indru, 50,000 copies, once a month as well, and the frequency refers to 16 editions with 4 additional editions. And also the Chinese one is twice a week, for Tamil once a month, and we hand it over.
Honourable Members,
Therefore I believe that we (the expenditure we have) is not too large and is still reasonable at a time when we need to convey important messages to the people, at a moment when media openness may no longer exist and we can anticipate that we will be in the opposite situation compared with two or one and a half years ago.
Honourable Members,
Therefore I hope this matter can be understood, that from time to time we still need to explain, clarify and not convey messages that are too political. Even if we say it is not political at all, it is not right. But not too political; rather, conveying facts, news and data to the people so that they are not confused, especially by information that is sometimes confusing and seeks to tarnish the image of the state government, as mentioned by Bukit Lanjan in his interjection just now.
Honourable Members,
I would like to respond to the matter from the Honourable Member for Taman Templer. But he is not here, concerning the Gombak Syariah Subordinate Court building which has not yet been occupied due to the unresolved issue of clean water supply. Pengurusan Air Selangor has directed that the construction of the reticulation pipe be connected to the tapping point located 1.1 kilometres from the Gombak Syariah Subordinate Court building. Did I already mention Pandan Indah, yes? I seem to have heard it ringing in my ears earlier. So, it's alright. I have already answered.
Next, there was also a matter raised about the Citizenship Programme or Statecraft Programme (Kenegaraan), which was allocated RM10 million under PK01 and PK18005, and indeed this programme has been running since 2017, and most of these programmes invite the people and community, especially the young generation, to take part together and participate in community social development programmes. There are several sectors and fields that we focus on, among them young people and university students, community and neighbourhood development, spirituality, the environment, and citizenship education. And for these young people, we set up programmes such as workshops, seminars, student welfare, service programmes, the career human capital programme, online series on various topics with university students, leadership programmes and the strengthening of the Selangor pioneer team, leadership programmes and implementation of activities. Meanwhile, with the community, we involve various programmes, among them workshops and training, and some of them functioned and were active during the Covid-19 period or during the last MCO season, and now to help deliver state government aid as volunteers and to encourage volunteerism. And in spiritual programmes, of course, it involves morals and religion, whether online or physically. The environment refers to programmes for environmental care and conservation, educating and training them to protect the environment, including planting trees and other activities. And citizenship education is the development of modules and knowledge transfer modules on citizenship and democracy games, which are one of the important foundations for introducing them to the basics of statehood, about important institutions, about constitutional monarchy institutions, parliamentary institutions, state legislative assembly institutions, and I believe this is not an easy task. It is a long process, and we cannot rely any longer on schools, because some of the facts may have changed and the conditions have also changed, especially in 2020 when the political situation changes every moment and every time.
Honourable Members,
I would like to turn to the development or issues relating to libraries, which have been raised quite a lot. The first is the status of the
Taman Sri Medan Public Library, Kuala Langat District. The Taman Sri Medan Sijangkang Library, Kuala Langat District, will be developed using a container concept, like the Selangor Public Library (PJ Kita Community Library Kampung Lindungan), which is a joint venture project with the Petaling Jaya City Council. The current status of this project is that it is in the process of resubmitting the planning permission application due to delays by the contractor and changes to the OSC online system at the Kuala Langat Municipal Council some time ago.
Meanwhile, the Honourable Member for Meru asked two questions. The first question concerns the Klang District Library, which was established in 1948 or 1973. This library receives a large and crowded number of visitors, with premises of 6,627 square feet. The project to upgrade this library was applied for under the RMK-12 budget, or the Twelfth Malaysia Plan, but has not yet been met because of consideration of the needs of other districts that still do not have libraries, such as Sepang District.
Second, the Selangor Public Library Meru, Klang District, is a village library service that uses the office space of the Meru Multi-Purpose Hall. The Klang Municipal Council, through the Finance and Assessment Committee Meeting No. 6 of 2019 dated 19 June 2019, acknowledged and approved the use of the premises by PPAS for the purpose of a Selangor Public Library for the period 1 July 2019 to 30 June 2021. PPAS (the Selangor State Public Library Corporation) has taken note of the proposal for improvements to the library and will propose to build a new one in Meru as applied for.
The second, or the next, is regarding the Taman Sri Medan Sijangkang Library. No, forgive me. The Kuala Langat District Library raised by Banting. Up to now, actually, at the site up to 31 October, the progress is 46.27%. And this is actually more than the estimate and schedule we set. In the schedule we set, the project progress was 44.2%, but today the progress of the project, which is earlier, has reached 46.27 and it records 13 days ahead of what we targeted. And, Insya Allah, if it proceeds quickly or proceeds well, we will be able to complete it by 26 June 2021, and so on, EOT or extra overtime, or the extra time was due to the 3-month Movement Control Order, which caused some disruption to the enlargement or upgrading project of the Kuala Langat District Public Library.
This has already been mentioned earlier. Next, regarding the Selangor Public Library Bangi, Hulu Langat District, which will begin to be upgraded based on the following information: from the date of the letter of acceptance (Surat Setuju Terima, SST) on 4 November (just now),
the date of land ownership on 23 November 2020, the construction period is 96 weeks, and the completion date for this Hulu Langat project is 26 September 2020 as arranged. This library will be upgraded using the rebranding concept of Public Libraries, which has been initiated since 2009, in line with the title "Bangi Bandar Ilmu". This library will later be upgraded using the rebranding concept of Public Libraries, which has been initiated since 2009, in line with the title Bangi Bandar Ilmu. This library will later be equipped with facilities suited to the needs of the local community, such as an adult reading area, children's reading room, playhouse, breastfeeding room, discussion rooms 1 to 3, reading room, lecture room, surau and several other facilities. Next, I would like to refer to the matter raised by Taman Medan regarding the Taman Seri Manja Library, Taman Medan, Petaling District, which has already been listed for library upgrading proposals for 2020. However, because of the Covid-19 pandemic, the preparation dates and quotation tender changed. This upgrading project started in November 2020 and is expected to be completed at the end of January 2021. Taman Medan, there is also none. January 2020, Taman Medan completed out there, neighbours of Taman Medan can also ask about what was raised. Lastly, I would like to refer to the Ampang Waterfront Public Library raised by Taman Medan, already mentioned, 2021, yes, will be completed in Taman Medan. Next, the Public Library at Ampang Waterfront. The Selangor Public Library Ampang Waterfront, Hulu Langat District, has been relocated to the Taman Seri Ampang area to make way for the privatisation project of the EKVE highway. However, the construction of this library has been delayed from the original plan, which was December 2020. The EKVE party expects the new completion date for this library project to be July 2021. Up to now, the site preparation works to begin the ausipile piling work in the library site area are ongoing. This delay is caused by changes to the building substructure design due to the weakness of the original soil structure at the site. However, the design changes have been completed and submitted to MPAJ for approval of the building plan and infrastructure plan. Honourable Members, I believe I have answered most of what was raised, especially regarding the education portfolio and also matters raised under the management of the Menteri Besar's Office and also the STANDCO involved. Insya Allah, all the matters that have arisen can be resolved, and can be explained for the development and progress of our state. Thank you.
Thank you, Most Honourable Member. All Honourable Members, the matter before this House is a Motion which reads that, under section 9, subsection 4(3) of the Development Fund Act 1966, this House resolves that the allocation of One Billion, One Hundred and Three Million Ringgit (RM1,103,000,000.00) stated in the Development Expenditure Estimates tabled before the House under section 4(1) of the same Act, as contained in the schedule, be approved.
Schedule of Development Expenditure Estimates 2021 Title / Description / Amount (RM) P.01 Office of the Menteri Besar and State Secretary 738,795,350.00 P.04 State Treasury of Selangor 280,000.00 P.08 Selangor State Department of Agriculture 14,000,000.00 P.10 Selangor State Forestry Department 5,225,000.00 P.12 Selangor State Public Works Department (JKR) 170,000,000.00 P.13 Selangor State Department of Irrigation and Drainage (JPS) 78,000,160.00 P.14 Selangor Islamic Religious Department 89,989,490.00 P.16 Selangor State Town and Rural Planning Department (JPBD) 1,710,000.00 P.17 Selangor State Veterinary Services Department (DVS) 5,000,000.00 TOTAL 1,103,000,000.00
Honourable Members who agree, please say YES. Honourable Members who do not agree, please say NO. This Motion is agreed to.
Motion No. 17 of 2020, Motion on Replacement of Members of the Select Committee on Agencies, Statutory Bodies and Subsidiary Companies (JP-ABAS)Motion
The next item on the meeting agenda is Motion No. 17 of 2020, Motion to Replace a Member of the Select Committee on Agencies, Statutory Bodies and Subsidiary Companies (JP-ABAS)
Mr Speaker and all Honourable Members, pursuant to Standing Orders 68C(2) and 68(2) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House resolves, firstly, that Honourable Tuan Mazwan bin Johar, State Assembly Member for Sungai Ramal, be appointed as a Committee Member in place of Honourable Tuan Borhan bin Aman Shah, State Assembly Member for Tanjong Sepat, on the Select Committee on Agencies, Statutory Bodies and State Government Subsidiary Companies (JP-ABAS).
Mr Speaker, I second the motion.
All Honourable Members, this Motion has been seconded. I now open the Motion for debate, if any. All Honourable Members, the matter before this House is a Motion which reads:
"Whereas, pursuant to Standing Orders 68C(2) and 68(2) of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House resolves that Honourable Tuan Mazwan bin Johar, State Assembly Member for Sungai Ramal, be appointed as a Committee Member
in place of Honourable Tuan Borhan bin Aman Shah, State Assembly Member for Tanjong Sepat, on the Select Committee on Agencies, Statutory Bodies and Subsidiary Companies (JP-ABAS)".
Honourable Members who agree, please say YES. Honourable Members who do not agree, please say NO. This Motion is agreed to.
The next item on the meeting agenda, Motion No. 18 of 2020, Motion to Replace a Member of the Special Select Committee on Poverty Eradication.
Mr Speaker and all Honourable Members, pursuant to Standing Order 71 of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House resolves, firstly, that Honourable Tuan Lai Wai Chong, State Assembly Member for Teratai, be appointed as a Committee Member in place of Honourable Tuan Mohd Zawawi bin Ahmad Mughni, State Assembly Member for Sungai Kandis, on the Special Select Committee on Poverty Eradication.
Mr Speaker, I second the motion.
All Honourable Members, this Motion has been seconded. I now open the Motion for debate.
As Chairman of this Committee, I would like to extend a warm welcome to the State Assemblyman (ADUN) for Teratai to our committee.
All Honourable Members, the matter before this House is a Motion which reads:
"Whereas, pursuant to Standing Order 71 of the Standing Orders of the Selangor State Legislative Assembly, this Honourable House resolves that Honourable Tuan Lai Wai Chong, State Assembly Member for Teratai, be appointed as a Committee Member in place of Honourable Tuan Mohd Zawawi bin Ahmad Mughni, State Assembly Member for Sungai Kandis, on the Special Select Committee on Poverty Eradication".
Honourable Members who agree, please say YES. Honourable Members who do not agree, please say NO. This Motion is agreed to.
Motion No. 19 of 2020, Motion under Standing Order 76(5) by Yang Berhormat SentosaMotion
The next item on the meeting agenda is Motion No. 19 of 2020, Motion under Standing Order 76(5) by the Honourable Member Sentosa.
Mr Speaker and all Honourable Members, I wish to move a Motion which reads as follows:
"Whereas, pursuant to Standing Order 76(5), the Standing Orders of the Selangor State Legislative Assembly, this Honourable House accepts the Report of the Standing Orders Committee of the Selangor State Legislative Assembly, which was tabled in this Honourable House as Meeting Paper No. 34 of 2020. Under Standing Order 69(3) of the Standing Orders of the Selangor State Legislative Assembly, it is the duty of the Standing Orders Committee to consider from time to time and issue a report to the House on matters relating to the standing orders referred to it by the House for tabling. The Standing Orders Committee of the Selangor State Legislative Assembly, in accordance with the mandate given by the House, has held meetings to study and examine all proposed amendments to the standing orders of the Selangor State Legislative Assembly as referred to it on 17 March 2020 and 15 July 2020. The list of Committee Members is as attached. The Committee's examination found that the proposed amendments involve the following standing orders:
Standing Order 11(1), Standing Order 15(1) and (2), Standing Order 16(6), Standing Order 17(3) and (4), Standing Order 56, Standing Order 66(2), Standing Order 68(1) and Standing Order 72(2).
The Committee's comments and recommendations regarding the proposed amendments to the standing orders stated in paragraph 5 are as attached. The Standing Orders Committee recommends that the proposed amendments to the Standing Orders of the State Legislative Assembly be approved in accordance with the Committee's comments and recommendations as attached. Sentosa wishes to propose. Thank you, Mr Speaker."
Mr Speaker, I second the motion.
Thank you. All Honourable Members, this Motion has been seconded. I now open the Motion for debate, if any. All Honourable Members, the matter before this House is a Motion which reads:
"Whereas, pursuant to Standing Order 76(5), the Standing Orders of the Selangor State Legislative Assembly, this Honourable House accepts the Report of the Standing Orders Committee of the Selangor State Legislative Assembly, which was tabled in this Honourable House as Meeting Paper No. 34 of 2020."
Honourable Members who agree, please say YES. Honourable Members who do not agree, please say NO. This Motion is agreed to.
Motion No. 20 of 2020, Motion under Standing Order 76(5) by Yang Sungai Air TawarMotion
The next item on the meeting agenda is Motion No. 20 of 2020, Motion under Standing Order 76(5) by the Honourable Member Sungai Air Tawar.
Silakan.
Peace be upon you, and may the mercy and blessings of God be with you, and greetings of well-being. Thank you, Mr Speaker, for allowing Sungai Air Tawar to represent the Public Accounts Committee (PAC) of the Selangor State Legislative Assembly to bring forward a Motion which reads as follows:-
"Whereas, pursuant to Standing Order 76(5) of the Standing Orders of the Selangor State Legislative Assembly, this honourable House receives the Report of the Public Accounts Committee (PAC) concerning Yayasan Selangor as contained in Meeting Paper Number 35 of 2020.
Mr Speaker, through the complaint that was made regarding the governance of Yayasan Selangor during the Committee Meeting Number 5/2020 on 29 July 2020, the PAC Committee decided that a closed hearing session be held with the management of Yayasan Selangor together with the Malaysian Anti-Corruption Commission (SPRM) and the Selangor State National Audit Department (Jabatan Audit Negara Negeri Selangor) to investigate and examine the governance issues at the Committee Meeting Number 7/2020 dated 26 August 2020. The findings and this report were compiled from the closed hearing session and face-to-face dialogue with the PAC Committee together with the Selangor State Audit Committee and SPRM through the examination and investigation of the PAC Committee. I found that there are matters that must be taken seriously and be of concern to the Honourable Dato' Menteri Besar, because Yayasan Selangor involves the coffers of the Selangor State Government. Before I proceed further, I would like to inform all Members of the House that the registration status of the Trustee Board Members of Yayasan Selangor (ALPAYS) at the level of the Companies Commission of Malaysia (SSM) has not been updated since 2016. Therefore, any approvals of Yayasan Selangor cannot be passed and confirmed at the ALPAYS Meeting. All decisions of Yayasan Selangor should be halted for the time being, including the sale of Yayasan Selangor's assets, until the ALPAYS registration records at SSM are updated. We from the PAC Committee were also informed that the newly appointed Secretary of Yayasan Selangor on 1 July 2020 is endeavouring to rectify the situation so that Yayasan Selangor can hold an ALPAYS Meeting if it wishes to complete the procedure for selling Yayasan Selangor's assets, namely the transfer of ownership of the assets that have been sold. For now, I was informed that the Secretary of Yayasan Selangor was newly appointed on 1 July 2020. Apologies. We are also regretful towards Yayasan Selangor because the financial statements for 2016, 2017 and 2018 are still in final draft to be tabled at the Trustee Board Members' Meeting in September 2020. This means that Yayasan Selangor has not been audited for four years since 2016. Among the reasons reported are, this one: the change of certification standard from PERS to MFRS, where Yayasan Selangor does not have staff who are experienced and knowledgeable about MFRS.
The property valuation for 52 assets involving six branches of JPPH, the high implementation cost, and the LHDNM investigation into the assessment tax of Yayasan Selangor for the years 2014 to 2017. This cannot be used as a reason, because Yayasan Selangor must be audited every year, in accordance with Section 9 of the Audit Act 1957, so that there is no leakage in any transaction. The Jabatan Kuasa also takes note of the results of the governance audit of Yayasan Selangor, which involved the Chairman of the Board of Directors and also the chairmen of other committees at the level of the Company's Board of Directors. And the preparation of working papers by the management of Yayasan Selangor regarding the appointment of committee chairmen to be tabled at the ALPAYS meeting before the end of 2020. The Committee takes note that Yayasan Selangor has total assets valued at 701 million, and the sale of Yayasan Selangor's assets is for assets that are not strategic and do not generate profit for Yayasan Selangor. Yayasan Selangor was also found to be bearing the burden of financial problems, given that the current cash balance of Yayasan Selangor is RM4.4 million. Meanwhile, the management cost of Yayasan Selangor reaches RM1.5 million a month, including the cost of property management and facility service management. For the information of all Members of the House, Yayasan Selangor has entered into a property development agreement at Kampung Pandan worth RM300 million, which will provide returns in stages over a period of 10 years until 2029. Therefore we are of the view that the proceeds of this payment can cover the debt burden of Yayasan Selangor without needing to sell up to 77 Yayasan Selangor assets. In addition, we found that the concept of asset sales is on a first come first serve basis, and a minimum price has been set as the reserved price. The management of Yayasan Selangor informed that the system is intended to facilitate the asset sales process, especially at the stage of obtaining approval from the bank. The minimum price for residential units and shop houses is based on the reference of the assist rate and the professional valuers who will be appointed. This should not have happened, because this concept will facilitate leakage in transactions. Every asset sale should indeed obtain the approval of the members of the Trustee Board of Yayasan Selangor. It should not be through the first come first serve concept. The Committee takes note that, for the time being, Yayasan Selangor is unable to provide assistance because the education fund does not have sufficient funds. Because of the failure of Yayasan Selangor in financial management, which was also informed, it has been registered with CTOS to obtain further information on borrowers for the purpose of collecting loan repayments. We also received a report that Yayasan Selangor's income is distributed according to a 70/30 ratio for the management fund and the education fund, but this applies only to revenue receipts worth more than RM100 thousand. The Committee also takes note that Yayasan Selangor has operating debts totalling RM2.9 million with loan repayments totalling 500 thousand a month. This poor management must be resolved immediately so that Yayasan Selangor is not plagued by a burdensome debt problem. Findings of the committee,
the committee is of the view that the failure of Yayasan Selangor to hold meetings of the Trustee Board Members of Yayasan Selangor optimally has led to the current governance and financial management problems of Yayasan Selangor. According to the records, the total number of ALPAYS meetings from 2016 to 2019 is as follows:-
2016 only once; 2017 no meetings; 2018 only twice; 2019 only once.
The Committee notes that the registration status of the Trustee Board Members of Yayasan Selangor at SSM is primarily the responsibility of the company secretary to update the registration data at SSM from time to time. Especially when there is a change in the list of members, Yayasan Selangor may not make any new decisions regarding the management or operations of Yayasan Selangor until the new Trustee Board Members of Yayasan Selangor have been officially registered in SSM. The Committee finds that the concept of asset sales on a first come first serve basis and the absence of a closing date for offers are not in accordance with the correct asset disposal procedure. This is based on the following views. The explanation from the Selangor State National Audit Department on the procedure for sales of government assets, where offers will be given to the highest bidder and offers will only be opened within a specified period. The view from SPRM is that there are many asset sales of Yayasan Selangor, involving 77 units. Where the importance of confirming any decisions regarding the asset sales method should be discussed and approved at the ALPA meeting to avoid illegal transactions. The PAC Committee is of the view that the distribution of Yayasan Selangor's income in a ratio of 70:30, which is only required on revenue exceeding RM100 thousand, is unreasonable and should be reviewed, given that education is the core of Yayasan Selangor's main service. The Committee learned that Yayasan Selangor has a long-term redevelopment plan with JV companies, where Yayasan Selangor has the potential to obtain total returns of at least 300 million as early as 2029.
Based on Appendix 1, the Committee finds that the summary of minutes of the meeting provided by Yayasan Selangor dated 19 December 2019 regarding the sale of Yayasan Selangor's assets has no verification evidence by ALPAYS. However, based on the memo issued by the Property Management Division on 14 May 2020, the asset sale of Yayasan Selangor was stated to have obtained ALPAYS approval on 19 December 2019, and the conditions of the sale of Yayasan Selangor's assets stated in the memo are contrary to the correct asset disposal procedure.
Therefore, the sale of Yayasan Selangor's assets is invalid. So the committee, the committee urges Yayasan Selangor to take appropriate action to ensure that the registration of the Trustee Board Members of Yayasan Selangor at SSM is updated immediately. And the Committee finds that this status has already been updated on 14 September 2020. The Committee also suggests that Yayasan Selangor always update the relevant information in SSM each time there is any change. The Committee is of the view that Yayasan Selangor should not proceed with the asset sales process, and decisions relating to property development should be deferred until the process of updating the Trustee Board Members of Yayasan Selangor at SSM is completed and until the proposal is brought and decided by the new Trustee Board Members of Yayasan Selangor. The Committee does not agree with Yayasan Selangor's decision to proceed with the asset sales, given that Yayasan Selangor has a long-term property development contract which is expected to bring returns of at least RM300 million within 7 years from 2019. The Committee urges Yayasan Selangor that, if the asset sales are approved by the new Board of Directors of Yayasan Selangor, the asset sales method must comply with the correct asset disposal procedure so that illegal transactions do not occur.
The majority of committee members urge the state government to appoint a board of directors consisting of State Assemblymen (ADUN) of the Selangor State Legislative Assembly as well as independent and professional representatives in the foundation so that there is a system of checks and balances in management decisions. And so that Yayasan Selangor can return to its golden era and help more Anak Selangor. The Committee also urges the new ALPAYS to monitor the operations of activities and the profit generation targeted to be achieved within the stipulated period. The Committee suggests that Yayasan Selangor allocate a higher allocation to education and not to management. The Committee urges that the financial statements must be audited every year in accordance with Section 9 of the Audit Act 1957 so that there is no leakage in Yayasan Selangor.
I believe that if Yayasan Selangor is managed efficiently and with integrity, this will not only bring good value to the Selangor State Government, but can also share the profits generated with all the people of Selangor State. Honourable Speaker, my summary is brief. I see what has happened in Yayasan Selangor, where the Trustee Board Members have not functioned as expected. We can see just now, their frequency of meeting, I think is not logical. Only once in 2016. The last time, 2019, only once in a year. Whereas we know the Board of Directors are those entrusted to manage the governance of the subsidiary or Yayasan Selangor.
So, I request the Honourable Dato' Seri Menteri Besar, if those entrusted to carry out this task are unable to do so, just change them
to new ones. There are many among the Selangor State Assemblymen, so give them the opportunity to serve together, pour in energy to build the State of Selangor. Not merely serving in their respective DUN, then in the sittings of the House three times a year, then sitting on committees. This one sits on a committee, others create problems, and we on the committee have to think. What action must be presented to resolve the problem. So I think it is better that these Honourable Members be given the role themselves to serve together in the subsidiaries of the Selangor State Government or foundations. Because this has happened, we sometimes see, the idea is good, the view is good, but its implementation cannot be monitored.
Perhaps it is true, the proposal is to sell 77 assets but the implementation is carried out on a first come first serve basis. Here I see the board of directors not holding meetings. If they held meetings, such matters would not happen. I think this is something shameful. It must be a lesson to the Selangor State Government so that it does not recur in the future. So I think that is all my summary. Thank you."
Mr Speaker, I support.
Honourable Members all, this Motion has already been supported. I open this Motion for debate. Meru.
Thank you to the Honourable Speaker. I would like to debate a little here on the report that has been tabled by the PAC Committee. Although it was tabled by the Leader of the Opposition himself, I support it because this matter is very serious and important for us to scrutinise, since it involves the interests of the State Government itself and also the interests of the people of Selangor State in particular. I see here from what was tabled by the Leader of the Opposition that it seems there was a deficiency in governance which caused these matters to arise, and I agree with several opinions and suggestions from the Committee for several urgings that have been tabled. I feel there is no need for me to state them at length for us to study. I also agree that the State Assemblymen (ADUN) be involved in the operations of Yayasan Selangor so that we are clearer and know what has happened, and also easier for us to explain to the people and also to explain the issues raised, especially by the Opposition itself. It may also have occurred merely as a perception, whereas we have not received an accurate answer or a clear answer from the management which may cause slander and also tarnish the image of the state government itself. Including matters relating to the sale of assets and so on, so far we have seen them from the media, but we still have not received a clear answer from the government itself, which I feel needs
to be done. If there is a misunderstanding, the people as a whole should know what has actually happened in Yayasan Selangor. Thank you.
Tuan Speaker.
Ya Jeram.
Thank you, Mr Speaker. As one of the members of the PAC Committee, I would like to give my own personal view, yes. Because not having audited for four years is a major mistake committed by the Foundation's own Board Members. And I was also informed that those on the Board of Directors Committee are the senior-most government staff. They should have been placed in the Foundation to advise the Committee on governing in a good or effective manner. And I also found that when 70% is for management or administration and 30% only for financing. Was this formula made in the era before Pakatan Rakyat, because for example if it were 1 million, 700,000 to the management of the Foundation, only 300,000 goes to financing. The objective of establishing this Foundation is to finance the children of Selangor, namely scholarships. But if in a business or whatever its objective is, establishing the Foundation is to finance students by providing scholarships. So it should be 70% to financing, 30% to management. So for this one, I think the Foundation's Board Members need to review it because these matters cannot be studied, as the PAC chairman said, namely the Honourable Leader of the Opposition, that there has been no meeting held to discuss. Because the meeting must be at least perhaps once every two or three months to identify how far the Foundation's progress has gone. And we found that when we called to ask about its status, the situation is indeed rather critical. But it will indeed obtain 300 million. 300 million within a period of several years. And we want to know how 300 million can still be made into 70/30. 300 million is a large sum, it should be able to finance many of the children of Selangor by providing scholarship loans or loans and so on for them to pursue further studies. So, I think this matter needs to be examined and I also support, previously I was split from the government but now I am Independent, but I still also support the Leader of the Opposition giving space and opportunity to the Honourable ADUNs to sit on the subsidiaries to balance the decisions made by the Committee, because the Honourable Members also have their own expertise in particular backgrounds to correct, give input, ideas for improvement for nothing other than to advance the subsidiaries and the State of Selangor itself. Thank you.
Ijok.
Thank you, Mr Speaker. As a son of Selangor, Yayasan Selangor is a GLC, a pride of the Selangor community. I want to ask the Committee how many years it has not submitted audited financial statements to SSM? If it has not submitted for years, I want to ask once more whether Yayasan Selangor still exists? In fact, SSM, if such problems occur, its organisation has been abolished.
Thank you, the Honourable Member for Ijok. Mr Speaker, I would like to respond. I understand the audit has not been done for four years. Let me give the most striking example. What shocked me most, during the hearing held on 11.08, was that the names of the Board of Directors in SSM itself had still not been changed. At that time, the names still listed were Mohd Kushrin bin Haji Munawi, Ismail bin Haji Idris as Director, then Dato' Nordin bin Sulaiman, Mohd Azmin Ali, Nik Nazmi bin Nik Ahmad, Mohd Shah bin Hashim on 11.08.2020, the time of our hearing. When we found this within a month, on 18.09, the new nominees were finally added, namely Mohd Amin bin Mohd Ahya on 14.09, Dr. Mahanom bin Maksam, Maznah binti Abu Bakar, Dato' Nor Azmi bin Diron, Eddy Adriantor bin Ahmad, and Dato' Menteri Besar, Dato' Seri Amirudin bin Shari on 14.09. But for Mohd Sah bin Hashim, he was added on 01.06.2020. If it was a slip, 01.06.2020, new names could be added repeatedly. But the directors were not added. So I think this is indeed a negligence, perhaps because the board did not meet. As I said earlier, if it did not meet, then there was no audit for four years. So we talk about integrity in a developed state. SSM should be ashamed. But I am not certain, although the findings are as such. So it is indeed shocking. Truly shocking.
Yes, I request...
Clarification. I would like to, but I am not very well..
Yes, Hulu Kelang.
Bismillahirrohmannirrahim.
Mr Speaker, I would like to offer a perspective from my experience as Chairman of the Special Select Committee on ABBAS and subsequently Chairman of the Select Committee on ABBAS after it was included in the Standing Orders. At first, we indeed faced problems when I chaired the Special Select Committee on ABBAS. I made visits and held closed-door hearings, and eventually I reported to SELCAT. SELCAT conducted a further study and held open hearings. There were indeed some rules that were not applied, especially the method of selecting the chief executive, who made many mistakes, including ordering that the tenants in the building be evicted and that an open tender be called. That is an old story, the details of which I will not go into. But what happened was
when we said the management was not running smoothly and not functioning well, he claimed he had been deceived by his deputy. That is a court case and has been settled. Then came the 2015 General Election, and we then elevated the ABBAS and PADAT Select Committees and PBT as committees contained in the Standing Orders of the State Assembly. Thus, there were three additional committees alongside what was assigned to the PAC. At that time, we practised that the PAC was one that was indeed enshrined in the Standing Committees, and we also placed ABBAS, PADAT and PBT there for audit. This action won praise from the Auditor General, the Ketua Audit Negara, because it facilitated the division of auditing tasks and the management of government agencies. So then, I found at that time that management, if transferred to Ismail, the most important thing was the manager. Ismail became the new chief executive. Ismail Idris, the new one. In the first year, the problem was Ilham Mazuki. At that time, too, we faced problems because he was replaced by his Deputy, and then he found that he was not managing well and that the Board of Trustees did not meet. They complained to me, and I prepared a statement and we presented to the State Assembly the importance of holding meetings. Because according to the Constitution or the Rules of Yayasan Selangor, Board members must meet three or four times a year. So indeed this has been a problem since then, and then we had the 2018 General Election, and that was a story that was neglected and left aside. So, I apologise, my illness has come upon me. So that is what I can share, because it has been made known formally and informally during the House sessions, the need to hold meetings, or otherwise we will face problems as we are facing now. That is all, thank you.
Mr Speaker, may I? I need a little more time.
Satu-satu.
Mr Speaker, I feel that under the Standing Orders, the Honourable Member for Sungai Air Tawar, as Chairman of the PAC, has tabled this motion and provided the summary, conclusion and so on. So I think only one person should debate, right? I do not want to. I would like perhaps a ruling from the Honourable Speaker.
This is actually a suggestion. A suggestion and advice I want to give.
All right. I accept the point from Bukit Lanjan who wishes to interject. From Bukit Lanjan, I ask Sungai Air Tawar to wait just a moment, yes.
Thank you, Mr Speaker. I ask that the Most Honourable Dato' Sri Menteri Besar be more careful, yes. Because I will give an example, because I want to say this: thankfully the PAC held a hearing. Recently the tender notice was issued, then first come first served. But at the same time, the SSM Board has still not been changed. If something happens, meaning, who decided it? What I mean is this, this must be made a lesson, as people say.
The Government may proceed.
Thank you, Honourable Members all. When I was winding up the stimulus package, I feel we touched on this issue to some extent, and I raised the issues of management and administration. For the information of all, among the major things that happened was between the period 2016 to 2019, because at that time Yayasan Selangor did not have a helmsman, and that is precisely why the projected meetings were not held, so 2017 was empty. 2018, one or two. 2017, if I am not mistaken, one. Eh, 2017, empty. 2016, empty, yes. And at that time I was informed that we were finalising. It was not me who at that time had to ask two or three people later why no meeting was held, yes. We corrected it. Then in 2019 we appointed a CEO, and from January 2020 onward, in fact, this fact or issue had begun to be known by the management of Yayasan Selangor and was brought to the Board of Directors' Meeting. In May 2020 we began to send a report to SSM to remove the names of the Board of Directors who were not valid. Once we removed them, the matter was only completed in November, or, pardon me, November, in the month of September 2020. So if we did not know or did not know, that is actually we knew. And to say that in 2019 we did not hold meetings is actually not correct. That may be a not very accurate fact. In 2019 itself there were four meetings attended by me. Two meetings were Special Meetings and two were Meetings of the Board of Directors. That this...
Honourable Member, continue tomorrow.
5.30?
Yes. Thank you. Honourable Members all. The time has reached 5.30 p.m. I therefore adjourn the House until tomorrow, 11th November 2020 (Wednesday), at 10.00 a.m. The House is adjourned.
( THE HOUSE ADJOURNED AT 5.30 P.M. )