Sarawak · 3 May 2019

18th Assembly, 4th session, 1st meeting (unedited) · not final · 269 turns · 33,657 words · official PDF ↗

72 of 269 turns machine-translated from Malay (Claude Haiku 5.5), marked EN. The original is the record.

ExperimentalSarawak publishes only unedited transcripts (Belum Disunting). The 19th Assembly was dissolved on 26 Oct 2026. Speakers are matched by our parser and will have some errors.

(Opening)

Mr SpeakerEN

In the name of God, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of God. Good morning and greetings of peace. Honourable Members, I have granted leave of absence under Standing Order 81 to the Honourable Encik Dennis Ngau, Honourable Member for Telang Usan, for today's sitting.

Datuk Dr Jerip Anak SusilPBB · GPSMambong

Tuan Speaker, point of order, Standing Order 32(6). “No member shall impute improper motives to any other member or make any statement or allegation which the said member is not prepared to substantiate”.

Tuan Speaker, I would like to refer to the Hansard for today on record of our speeches for yesterday, page 34, whereby the Honourable Member for Kota Sentosa, he is not here today but I would like to refer the speeches made by him yesterday, page 34. Whereby he says in reply to the Speaker yesterday, “I know he is on your side, he is working together with PBB lah but as far as SUPP, PRS, PDP is concerned I don’t know, are they going for your neck, be careful. But he is working with PBB anyway, okay”.

Tuan Speaker, I feel that this statement should not be here in this Hansard and therefore I strongly demand that it should be expunge from this Hansard because of its nature, it is inflammatory. Thank you.

Mr Speaker

Will one Minister, but it is already here. It’s already in the Hansard, how do you expunge?

Datuk Dr Jerip Anak SusilPBB · GPSMambong

He has to withdraw the statement, Tuan Speaker.

Mr Speaker

It’s already here. Unless the Honourable Ministers put a Motion. It’s already here you can’t expunge it, if it is brought up yesterday, then damage can be prevented. This one damage has been done might as well have a Motion whereby one Minister to propose the other one, Assistant Minister to second that if he doesn’t withdraw, then you suggest what step to be taken.

Datuk Dr Jerip Anak SusilPBB · GPSMambong

I stand guided on this, Tuan Speaker.

Mr Speaker

Ya. Because it’s already printed in the Hansard, damage has been done. Ahli Yang Berhormat Ir Aidel Bin Lariwoo, Sadong Jaya.

Questions for Oral AnswersQuestions

Mr SpeakerEN

Water Supply in Samarahan Division

(154) Honourable Ir Aidel Bin Lariwoo asked the Minister of Utilities: What is the status of the tenders for the water supply enhancement works in Samarahan Division?

Datuk Liwan LagangPRS · GPSDeputy Minister of Water Supply · BelagaEN

Thank you, Mr Speaker. For the information of the Honourable Member for Sadong Jaya, under the Projek Rakyat Programme, which covers the works to enhance the water supply system in Samarahan Division, a total of 11 tenders have been called. Of the 11 projects that have been tendered, four projects have already been completed, while seven projects are still under construction.

The projects that will be tendered later this year, and all the projects under the Projek Rakyat Programme for Samarahan Division, are expected to be completed by the end of 2020 at the latest. Thank you.

Ir Aidel Bin LariwooPBB · GPSSadong JayaEN

(Supplementary question). Thank you, Deputy Minister, for the answer just now. However, I have two supplementary questions.

1) What is the scope of works included in the projects mentioned just now? 2) What is the total cost of this Rakyat project in Samarahan Division?

Thank you.

Datuk Liwan LagangPRS · GPSDeputy Minister of Water Supply · BelagaEN

Thank you, Honourable Member for Sadong Jaya. It has been noted that this is the nature of an Insenior (Ir), who wants a careful scope and cost.

For the first answer, the scope of works for the short-term improvements includes:-

(a) Rehabilitating the existing treatment plant; (b) Rehabilitating the existing leaking water tanks; and (c) Building a new submarine pipe to increase water supply from the Kuching Water Board to Asajaya and others.

Among the scope of works for the long-term improvements are:-

(a) Replacing dilapidated pipelines so that they do not become clogged and do not burst; (b) Increasing the number of booster pump stations and high-level tanks; and (c) Building main pipelines and others.

As for the second answer, the estimated total cost of the Rakyat project in Samarahan Division is RM414,660 juta. I would also like to inform the House that the Rakyat project is fully financed by the Sarawak GPS Government. Thank you.

Mr SpeakerEN

The Honourable Encik Yussibnosh Balo, Tellian.

Native Court Customary Land Settlement

(155) Honourable Encik Yussibnosh Balo asked the Chief Minister: The Native Court plays an important role in cases relating to custom and the settlement of customary land in Sarawak.

1) What is the number of magistrates in the Sarawak Native Court? 2) What is the total number of cases that have and have not been settled, by year?

Datuk John Sikie Anak TayaiPRS · GPSJunior Minister of Bumiputera Customary Law · KakusEN

Thank you, Mr Speaker. For the information of the Honourable Member for Tellian, the number of magistrates in the Sarawak native courts is currently 72. These magistrates handle civil cases such as disputes over valid Bumiputera customary land.

There are two categories of magistrates in the Sarawak Native Court, namely:-

(a) The first category are those appointed on contract from year to year. These magistrates consist of one President, Native Court of Appeal President, Native Courts of Appeal, two Native Court Magistrates President, and 17 District Native Court Magistrates.

(b) The second category is 52 ex-officio persons, automatically appointed based on the office held, consisting of 12 Divisional Residents, or Resident Native Courts Magistrates, which we call Resident Native Courts Magistrate, and 40 District Officers, namely District Native Court Magistrates.

The total number of cases under the jurisdiction of the magistrates that have and have not been settled as at 28 February 2019 is as follows:-

For civil claim cases, 4,684 cases have been registered. Of this total, 2,370 cases or 50.6% have been settled. Meanwhile, the cases not yet settled number 2,314 or 49.4%.

And secondly, for applications to be treated as a Bumiputera community under the jurisdiction of the Divisional Native Court, the total number of applications registered is 1,657 cases. Of this total, 269 cases or 16.2% have been settled, and 1,388 or 83.7% are ongoing and in the process of being settled.

Encik Yussibnosh BaloPBB · BNTellianEN

(Supplementary Question) Thank you, Deputy Minister, for the answer that has been given. I see the role of this Native Court as very important, especially in the situation of Sarawak Bumiputera, where at present there are many disputes that have not yet been resolved, according to the Deputy Minister just now. And given that there are many cases relating to civil claims and other related cases under the jurisdiction of the Native Court that have not yet been resolved.

1) What is the Native Court's plan to resolve almost 50% of these cases that have not been settled?

2) On the part of the State Government, namely the present GPS Government, what is the government's plan to support the Native Court in the various matters mentioned?

Thank you.

Datuk John Sikie Anak TayaiPRS · GPSJunior Minister of Bumiputera Customary Law · KakusEN

Thank you, Honourable Member from Tellian. So, I am answering both questions together. For the information of the Honourable Member from Tellian, the Sarawak GPS Government has decided that a comprehensive study be carried out to review and upgrade all the structures of the Sarawak Native Court so that it becomes an independent and autonomous legal institution on a par with the Civil Court and the Syariah Court.

The terms of reference for the study have been completed, and the Government has appointed a Steering Committee and a Technical Committee to ensure that the study is carried out in accordance with the terms of reference, and that its results meet the objectives and aspirations of the Sarawak Government. Consultation: the Consultant will be appointed shortly. Thank you.

Mr SpeakerEN

The Honourable Encik Awla Bin Dris, Simunjan.

Short Courses and Training for Rural Residents

(156) Honourable Encik Awla Bin Dris asked the Minister of Welfare, Community Wellbeing, Women, Family and Child Development: Does the Government plan to hold short courses and training, such as those held at Wisma Wanita, brought to rural areas including the area of the N.25 Simunjan State Constituency? Thank you, Mr Speaker, "Lemak masin si kicap Thong Nam, my question number 156.

Mr SpeakerEN

This time, not this one, "under the tree there is a tiger, ah"

Puan Hajah Rosey Binti Haji YunusPBB · GPSJunior Minister of Women, Family and Child Development · BekenuEN

Mr Speaker, I am not good at composing pantun, so I cannot answer that pantun, but the question can be answered, Mr Speaker.

For the information of the Honourable Member for Simunjan, the Ministry, through the Sarawak Women and Family Department (JWKS), always prioritises women and single mothers in need, and for that reason the empowerment of women is the main objective theme of the Sarawak Women and Family Department, especially in the fields of skills and also economics. As we are well aware, the Sarawak Women and Family Department provides several courses, namely Culinary, Beauty, Spa and Massage, and also Creative Sewing at the Wisma Wanita Training Centre in Kuching. And for creative sewing, "is not talking about" ordinary sewing, it takes the form of weaving and also sewing that is other than just tailoring clothes, creative sewing.

To extend access to rural areas in particular, the Sarawak Women and Family Department previously held several courses called the Mega Course, which were held in several areas of Sarawak. So, starting this year, the Sarawak Women and Family Department is holding courses in a "pocket training" format in the form of "focus group woman skill training" for 25 participants per group. The objective remains the same, namely to train women, especially single mothers, low-income women and also housewives.

Besides that, the Sarawak Women and Family Department also provides an ICT for IT course for single mothers. This aims to enable them to master basic ICT so that they can run businesses online. It is also well understood that one of the constraints on business among this group is financial capital. Therefore, the Honourable Chief Minister of Sarawak approved RM500,000.00 in 2018, and RM1 juta for this year, for the purpose of a "starter kit" or to "up-scale" their businesses. Every successful applicant will receive business equipment assistance worth RM5,000.00 "and of course we are indeed very thankful to the Honourable Chief Minister and the GPS Government" because it helps "especially our ladies to start up their business as a starter kit, and of course to some for them to scale up their business". Thank you.

Encik Awla Bin DrisPBB · GPSSimunjanEN

(Supplementary Question) Thank you, Mr Speaker. Mr Speaker, Sarawakians, Sabahans, I have a supplementary question.

1) How long are the courses held at Wisma Wanita? 2) How can the success of the participants who have followed these courses be measured?

Thank you.

Puan Hajah Rosey Binti Haji YunusPBB · GPSJunior Minister of Women, Family and Child Development · BekenuEN

Thank you, Mr Speaker. Sarawakians, Sabahans, this is the answer to the supplementary question.

For the duration of the courses held at Wisma Wanita, it is only two days, but for the ICT for IT course, namely ICT for single mothers, it is four days. Then, besides that, there are also some success stories, actually only for these women, and some have asked how we know that they have succeeded in the courses conducted by our Women's Department.

So, one of the ways to learn about their "success stories" is from the WWTC graduate survey forms, and secondly, the Sarawak Women and Family Department Coordinator together with the vendor will hold a WWTC Coordination Meeting because

there are also those who belittle, saying, "what are your success stories? Actually, we do have success stories for the graduates. If I can mention a few, one of them is Puan Rauyah Binti Abdul Ghani in the beauty field. So, after she has gone through the course, of course she has up-scaled herself, and whereas her initial income was only RM300.00 a month, after going through the course, learning how to market, networking and so on, now she is earning more than RM1,200.00 per month. That is the beauty field, and we have one example also for the culinary field, namely Puan April Knight Anak Bujang, whose income before this was less than RM600.00, and now with the course and with the variety of skills that have been taught, she can manage to earn more than RM1,200.00 a month. So, these are among the success stories.

For the information of the Honourable Member for Simunjan, do not worry too much, because the Women Skill Training for you will be on 13 to 14 July. Insha'Allah. Thank you.

Mr SpeakerEN

The Honourable Member for Tupong.

Agricultural Projects/Programmes/Funds and Their Benefits to Youth

(157) Honourable Encik Fazzrudin Bin Haji Abdul Rahman asked the Minister of Agricultural Modernisation, Native Land and Regional Development: How many youths have benefited from the Projects/Programmes/Funds of the Ministry of Agricultural Modernisation, Native Land and Regional Development since 2018?

Thank you, Mr Speaker.

Under the tree there is a tiger. My question is not No. 3 but 157.

Dr. Haji Abdul Rahman Bin Haji IsmailPBB · GPSJunior Minister of Agriculture · Bukit KotaEN

A good partnership between the two Honourable Members there, who enjoy exchanging pantun. Thank you, Mr Speaker.

For the information of the Honourable Member for Tupong, youth participation in agriculture in Sarawak State remains at a low level. The definition of youth is within the age range of 18 to 40 years. Overall, in Sarawak State, there are 171,192 farmers registered with the Kawasan Farmers' Organisation (PPK) as at December 2018. Of this total, only 12% are youths.

In 2018, a total of 5,220 people were given assistance by the Sarawak Department of Agriculture across all divisions of the State, with aid valued at RM30.8 million. Of that total, only 828 persons or 16% were youths. And the total aid received was RM6.4 million.

Meanwhile, in this year of 2019, it is estimated that 5,795 people will be given assistance by the Sarawak Department of Agriculture with aid valued at RM34.6 million. For youths, the target is 1,343 persons or 23% with aid valued at RM11.6 million. This is an increase of 7% for youths from 2018. Thank you.

(Supplementary Question) I have two supplementary questions, Mr Speaker.

Given that there is too little youth participation or youths receiving assistance, I am not sure whether it is because they have applied less or because they are less eligible, but:

1) What steps has the Government taken to encourage more youths to venture into the agricultural sector?

2) What activities/funds have been allocated to youths towards agricultural activities?

Thank you, Honourable Member.

Dr. Haji Abdul Rahman Bin Haji IsmailPBB · GPSJunior Minister of Agriculture · Bukit KotaEN

Thank you, Honourable Member for Tupong, for those two supplementary questions. To answer the supplementary questions:

The Department of Agriculture provides assistance in the form of agricultural inputs and supportive advisory services for various programmes: crop, livestock, aquaculture and also agro-based industry programmes. And these applications are open to all groups regardless of their economic level, age or education. Therefore, it is the Government's hope that more youths, especially graduates of Higher Learning Institutions, will engage in this agricultural field as their main occupation. Various facilities and assistance are provided by the Government to encourage the participation of this youth group. These include:

(a) Providing Medium to Long-Term Training, namely for a period of one year and six months to two years at the Semenggok Agricultural Institute;

(b) Providing Short-Term Training; three days to one week at local agricultural stations, including in the fields of ICT and agro-based industry;

(c) Providing special funds for those who wish to expand their business through the Agriculture Venture Capital;

(d) Developing a New Agricultural Model, namely Agropark, alongside improving the existing Permanent Food Production Park (TKPM) programme. Both programmes are very suitable for youths; and

(e) Expanding the Young Agropreneur Programme.

As for the second supplementary question, among the programmes most favoured by youths based on the percentage of assistance to youths in 2018/2019 are pepper cultivation, oil palm, entrepreneurship programmes and stingless bee keeping. Next, also popular are the cultivation of vegetables and horticultural crops using the fertigation system, namely by applying modern agriculture such as smart and precision farming based on the use of IoT. This programme is in line with the Ministry's direction to modernise agricultural practices that are of quality and have export value.

So, it is hoped that with the greater participation of youths, the Government's aspiration to move away from being an importer of agricultural-based products, where the trade balance deficit is valued at RM3.6 billion at present, to becoming a net exporter of food products by 2030 will become a reality. Thank you.

Mr SpeakerEN

Honourable Member for Opar

Implementation Status of the Opar New Town (RGC) Construction

(158) Honourable Dato Ranum Anak Mina asked the Minister of Urban Development and Natural Resources: What is the implementation status of the construction of the Opar New Town (RGC) by the Land Custody and Development Authority (LCDA), and when is it expected to be fully completed?

Datu Haji Len Talif SalehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

Thank you, Mr Speaker, and thank you, Honourable Member for Opar. To answer the question, the Land Custody and Development Authority (LCDA) completed the site preparation works, namely site clearing and earth filling works for the residential site in 2016 with an allocation of RM5 million, and subsequently the site preparation works for commercial use were completed in 2017 with an allocation of RM10 million.

In 2019, this year, an allocation totalling RM17 million has been approved to carry out basic infrastructure preparation works such as roads, electricity connection and piped water supply at the residential and commercial sites. These infrastructure preparation works are expected to start in this quarter of the year and be completed next year. It should also be clarified that the cost of this project is fully financed by the State Government, GPS. Thank you.

Dato Ranum Anak MinaBEBAS · BNOparEN

Thank you, Deputy Minister. Mr Speaker, I have two supplementary questions.

1) What other components are planned for the Opar RGC for the remaining two years of the Eleventh Malaysia Plan? 2) When will all these components be fully completed?

Datu Haji Len Talif SalehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

Thank you, Mr Speaker, and thank you, Honourable Member for Opar.

For the information of the other components of the Opar RGC planned for these coming two years, namely in the RMK11, they are housing that will accommodate 68 housing units on an area of 8.5 acres, and a commercial centre containing hawker stalls, markets, mini shops, industrial cottages and so on. As for the second question, these housing and commercial centre components are expected to start at the end of 2020 and are expected to be fully completed in the Twelfth Malaysia Plan. Thank you.

Mr SpeakerEN

The Honourable Member for Krian.

Implementation Status of Communication Towers

(159) Honourable Encik Ali Anak Biju asked the Chief Minister:

1) How many communication towers have been built since the digital economy initiative was announced? 2) What is the total construction cost that has been paid to the contractors?

(216) Honourable Dato' Haji Idris Bin Haji Buang asked the Chief Minister: What is the period and timeframe for the construction of the infrastructure and communication towers to complete "Internet Connectivity" for the whole of Sarawak, and what is the implementation status of this?

Encik Abdullah Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · SemopEN

Assalamualaikum Mr Speaker and thank you to the Honourable Member for Krian for the question on our telecommunications system, and I will answer the question of the Honourable Member for Krian together with the question from the Honourable Member for Muara Tuang which involves the same matter.

For the information of both Honourable Members, this digital initiative began when we introduced the SMA Ordinan 2017, and SMA began full operations last year and planning began at the end of last year, only a few months ago.

The initial plan was to build 300 towers (menara) throughout the State of Sarawak, and so far the initial work involves recce (survey) for all 300 towers which is ongoing and it is hoped that the construction work and installation of equipment and commencement of operations, they called it Go Life, will be by the end of 2020.

The cost so far involves payments made to contractors directly involved in the recce activity. This recce does not mean survey, this is just a recce site. The Government has spent RM500 thousand on approximately 20 contractors involved in this recce activity.

Encik Ali Anak BijuPKR · PHKrianEN

I have two supplementary questions.

1) How many of these telcos will be built in the Saratok area?; 2) The Sarawak Government plans to build five thousand telcos, and how long is the period to build five thousand telcos?

Encik Abdullah Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · Semop

Berapa banyakkah?

Encik Ali Anak BijuPKR · PHKrianEN

How long is the period? To build five thousand?

Encik Abdullah Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · SemopEN

Five thousand telcos?

Encik Ali Anak BijuPKR · PHKrianEN

Yes, the State Government intend to construct five thousand telco, tele-communication tower?

Encik Abdullah Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · Semop

I appreciate your concern Ahli Yang Berhormat for Krian, I must apologise to you, I don’t have the exact numbers of towers to be constructed in Saratok, but I am ready to convey that to you immediately when the numbers are available to me.

To your question of how long does it take to build five thousand towers, but for the first 300 towers, rest assured that the 300 towers will be fully operating by 2020. Constructing a tower is not that easy, even each tower, because dia melibatkan tidak kurang daripada 20 agensi dan recce ini melibatkan sebuah kawasan negeri yang sebesar Semenanjung Malaysia dan kebanyakan tower ini dibina di luar bandar.

Status Pelaksanaan Menara Komunikasi

(159) YB Encik Ali Anak Biju bertanya kepada Ketua Menteri :

1) Berapa banyakkah menara komunikasi (communication tower) yang telah dibina sejak inisiatif ekonomi digital diumumkan?

2) Berapa jumlah kos pembinaan yang telah dibayar kepada kontraktor?

Encik Abdullah Bin Haji SaidolPBB · GPSJunior Minister of Corporate Affairs · Semop

Agensi-agensi yang kita perlu that we have to engage adalah seperti Land and Survey Department, SESCO untuk memastikan ada bekalan elektrik dan juga Jabatan Kerja Raya (JKR), Local Councils and of course most important is the network facilities providers and network services providers. So, we have to engage with them to ensure that the towers are truly functioning if we were to construct at certain areas.

So, if you are asking me how long does it takes to construct 5000 towers, let us first build 300 towers. Thank you.

Status Menaik taraf Jalan Datuk Mohd. Musa

Mr SpeakerEN

The Honourable Member for Stakan.

(160) YB Dato Sri Haji Mohammad Ali Bin Mahmud asked the Minister of Infrastructure Development and Transport when the road upgrading works along Jalan Datuk Mohd. Musa to Bulatan G3 will begin and how long the period of the road upgrading works will be?

Datuk Haji Julaihi Bin Haji NarawiPBB · GPSJunior Minister of Jalan Pesisir · SebuyauEN

Thank you, Mr Speaker. Thank you, Honourable Member for Stakan, for asking the question. For the information of the Honourable Member for Stakan, the road upgrading works along Jalan Datuk Mohd. Musa to Bulatan G3 Samarahan are still at the detailed design stage or detailed design, and the preparation of tender documents after the value engineering lab was held on 18 to 22 February 2019 last. This project is expected to resolve traffic congestion along the road, and this means that this project is among the high-impact projects.

In terms of its scope, this project involves works such as the following:

(a) Four-lane dual carriageway road along 10.7 km; (b) Three new bridges; (c) Two existing bridges will be replaced with new bridges; (d) Construction of two pedestrian overhead bridges; and (e) Installation of street lights along the road will also be carried out.

Thank you.

(Supplementary Question). I have two Supplementary Questions.

1) How long is the period of the road upgrading works along Jalan Datuk Mohd. Musa up to Bulatan G3 Samarahan?

2) What is the estimated cost of the road upgrading project? Thank you.

Datuk Haji Julaihi Bin Haji NarawiPBB · GPSJunior Minister of Jalan Pesisir · SebuyauEN

Thank you, Honourable Member for Stakan. This project is expected to start at the end of August 2019 and it is expected to take 36 months, that is three years, and its cost is RM228.4 million. Thank you.

Repair of Dilapidated School in the State

Mr Speaker

Ahli Yang Berhormat bagi Batu Danau.

(161) YB Encik Paulus Palu Gumbang bertanya kepada Menteri Pendidikan, Sains dan Penyelidikan Teknologi the Federal rejected the State Government’s offer of RM1 Billion (Contra State Government debt to the Federal Government) to repair dilapidated schools in the State. What are the steps to be taken by the Government to ensure the much needed repairs are done to these schools?

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research · Nangka

Terima kasih Ahli Yang Berhormat for Batu Danau. Tuan Speaker, with regards to the dilapidated schools, it has attracted a lot of interests among the Ahli-Ahli Yang Berhormat. There is a lot of Ahli-

Ahli Yang Berhormat who submitted the similar questions but I will focus my answer to question from Ahli Yang Berhormat for Batu Danau.

The State Government is taking it very seriously about the dilapidated schools. That is why in July 2018, the YAB Chief Minister offered to repay it, the State debts with the Federal government of RM1 billion is meant for dilapidated schools. After a long waiting, there was a statement by the Minister of Education in April, after the meeting with the YAB Chief Minister has agreed with the procedure where the State Government used the procedure of contra-payment. But unfortunately, in April the Federal Government make a U-turn, though some people do not agree with the word U-turn, I will elaborate on that, that the Federal wants us to pay advance payment.

It does not make sense for someone to pay a loan in advance just because your business is not good or it is just because you do not have the money to build the schools. For example, I take an analogy, I loan a car and the business of that company is running down and they asked me to pay in advance of my loan car, does it make sense? It does not make sense at all. In terms of contract, it does not make sense at all as well. So, we do not agree with this advance payment format. Therefore, there is still a deadlock on what has been said, there is no such thing as being deadlock, there is still a negotiation between the Federal Government particularly the Ministry of Education and the State Government on this issue.

And also, it is not right that by using this payment of RM1 billion to the State Government, we are using the money at our whim and fancies, at our own wish and as we like. No, we have agreed that if this is the formula that we want to use there will be three (3) Committee to be formed. A Committee comprises of three (3) agencies, that is the Ministry of Finance, Ministry of Education and the State Government. Even the State Government do not have the final say about the list of the schools. We only can submit to the Ministry of Education. They have the final say. There is no such thing as allegations that we want to use this money at our whim and fancy. This is a very serious allegation just to prove that we are not transparent. In fact, it involves every agencies, the Federal, the State, how this RM1 billion money can be used. That is number one.

Number two Tuan Speaker, I want to deliberate a bit. People are accusing us what we have done for the last 55 years. Please don’t forget your history. Who are the Minister of Education for the last 55 years? Three of them now are in Pakatan Harapan Government. Three of them are in Pakatan Harapan Government. One in waiting Prime Minister? Now the other Prime Minister? One is the President of the party of the component of Pakatan Harapan. 55 years are monopolized by these three persons who are the Ministers of Education. Only one time the Sarawakian is the Minister of Education.

And yet at that particular time when he was the Minister of Education, he was able to bring up and built UNIMAS the fourth public university and also build up the medical school for the State of Sarawak. So please if you want to accuse that what we have done for the last 55 years, learn your history. Learn the history properly. Otherwise, you are just accusing your boss now not doing their work for the past 55 years. Thank you very much.

Encik Paulus Palu GumbangPBB · GPSBatu DanauEN

Thank you, Yang Berhormat Menteri Muda. A fiery answer. I have two Supplementary Questions, Mr Speaker.

1) How much funding from the State Government has been spent on repair works for schools throughout the state?; and

2) What is the total number of schools that have benefited from this programme? Thank you.

Dr Haji Annuar bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research · Nangka

Tuan Speaker, education is under the Federal list but because it is so important for the people of Sarawak, the State Government has done a lot about this problem.

I would like to read because it involves the figures. There are two new projects on the relocation and rebuilding of the schools which involved SK Ulu Sengan, Bintulu with the cost of RM29,488 million and SK Meludam, Betong with the cost of RM35,765 million. The total is about RM65 million. This is from the State Government money not from the Federal.

Through The Rural Transformation Initiative - From 2018 till 2020 next year, involving 63 schools at the cost of RM20 million from the State Government money not form the Federal.

Chief Minister Special Development Allocation Fund (SDAF) - Estimated about RM37 million involving 90 schools. All the total is RM123 million. I want to compare, this is RM123 million, the Federal Government only approved RM100 million this year for the State for the dilapidated schools. We spent RM123 million not inclusive of RM50 million which has been approved for electricity.

This is how serious the State Government want to make sure the dilapidated school is being addressed and all these 155 schools were being involved in what is the State Government going to do for the dilapidated school in Sarawak. Thank you very much.

Mini Complex dan Pembinaan Indoor Stadium di Serian

Mr SpeakerEN

The Honourable Member for Bukit Simuja.

(162) YB Encik John anak Ilus asked the Minister of Tourism, Arts, Culture, Youth and Sports. Does the Sarawak Government have any plans in the near future to:

1) Upgrade the existing Serian Mini Complex to be on par with sports complexes in other districts or divisions in Sarawak; and

2) Build a new international-standard Indoor Stadium

Datuk Snowdan LawanPRS · GPSDeputy Minister of Youth and Sports · Balai RinginEN

Thank you, Mr Speaker. Thank you, Honourable Member for Bukit Simuja. To answer Question (a), our Ministry currently does not yet have any plans to upgrade the Serian mini complex.

As for Question (b), for the time being our Ministry also does not yet have any plans to build a new international-standard Indoor Stadium in Serian. However, if there is a need and request, the Government will submit proposals in the future according to priority. Thank you.

Encik John anak IlusPBB · GPSBukit SemujaEN

Thank you for the answer of the Menteri Muda. So, I have two Supplementary Questions.

1) Given that the Ministry does not have plans to upgrade the Serian Mini Sport Complex, what other efforts have been carried out by the Ministry?

2) What alternatives have been taken by the Sarawak Government to provide an indoor venue for major events in the Serian division?

Thank you.

Datuk Snowdan LawanPRS · GPSDeputy Minister of Youth and Sports · Balai RinginEN

Thank you, Mr Speaker. To answer the first Supplementary Question. Our Ministry, although we do not have plans to build or upgrade this Serian Mini Complex, nevertheless the facility was upgraded in 2014. And approximately RM3.08 million was spent on the upgrading in 2014. This was to equalise this sports complex so that it is the same as sports complexes in the other divisions. And this project was already prepared by the Serian District Council.

As for the second (2) answer, for the information of the Honourable Member for Bukit Simuja, as announced by our former Chief Minister in 2016, the Serian division will have a Confront Centre in the new town of Serian, and this will provide facilities for the people of the Serian division to hold major events in the future. Thank you.

Mr Speaker

Ahli Yang Berhomat Dato Henry Harry Anak Jinep for Tasik Biru.

“Food Basket” in the Bidayuh Belt Areas

(163) YB Dato Henry Harry Anak Jinep to ask the Minister for Modernisation of Agriculture, Native Land and Regional Development. Does the State Government have any plans to create a Development Agency to emphasize aggressively on Agriculture and Tourism as “food basket” in the Bidayuh Belt stretching from Lundu to Serian similar to those in Betong and Sarikei?

Datuk Roland Sagah Wee InnPBB · GPSJunior Minister of Native Customary Land Development · Tarat

Terima kasih Tuan Speaker. Terima kasih Ahli Yang Berhormat dari Tasik Biru. For the information of the Honourable Member for Tasik Biru, the Bidayuh Belt, which stretches from Lundu, Bau, Penrissen, Siburan, Padawan, Serian, Tebedu and Mongkos is a strategic agricultural growth hinterland which is within the greater Kuching development area. The establishment of a dedicated regional development agency will definitely accelerate the phase of agriculture development within the southern region. As such, the government is considering Sarawak Land Development Board (SLDB) to play that role to spear head agricultural and tourism activities within the southern region. Those two main activities for the greater Kuching development area culture and tourism. Those are the two main one and actually for the Bidayuh Belt it has been identified as also the Durian Belt because of sales of suitability. Thank you.

Dato Henry Harry Anak JinepPDP · GPSTasik Biru

(Soalan Tambahan) Terima kasih Assistant Minister for the reply. I hope our face does not look like durian (laughter).

I have two supplementary question.

1) What are the new approaches initiated by the government to transform the Agriculture sector? 2) Is there any plan to set up Agro Park or TKPM in Tasik Biru?

Thank you.

Datuk Roland Sagah Wee InnPBB · GPSJunior Minister of Native Customary Land Development · Tarat

Thank you Ahli Yang Berhormat for Tasik Biru. Tuan Speaker, for the further information for the Honourable Member, the government will embark on the concept of public private partnership. These are the approach that we are taking and the concept involves the engagement of anchor companies, Agropark and also Taman Kekal Pengeluaran Makanan (TKPM) to accelerate the culture development in the State. At the moment there are four TKPMs and three Agroparks being implemented and identified. To accelerate regional development the government has also set up the regional agencies such as Northern Region Development Agency (NRDA), Highland Development Agency (HDA), and the Rejang Development Agency (URDA). Anchor farming concept has also

been introduced to provide the opportunities for the small holders and out growers to be actively involved. In agricultural activities that will generate income for the rural community. We will ensure that anybody who becomes the anchor company should have market access and market specific this is the condition. Actually, for this year, within the southern region, for this year 100 metric tans of durians has been exported overseas.

As to the second supplementary question, for Tasik Biru, there is already one TKPM at Pajiro and if there is availability of suitable land, the government is willing to consider setting up the Agropark. Thank you.

Mr SpeakerEN

The Honourable Member Encik Ripin Bin Lamat for Lambir.

Problem of Odour Pollution and River Pollution from Sibuti Landfill

(164) YB Encik Ripin Bin Lamat asked the Minister of Urban Development and Natural Resources. What actions has the Government taken to resolve the problem of odour pollution and river pollution caused by the Sibuti Landfill?

(214) YB Encik Ripin bin Lamat asked the Minister of Urban Development and Natural Resources. Is the Government's action in addressing environmental pollution in Sungai Subak caused by the waste disposal centre "Sibuti Landfill" in Kampung Subak, Bekenu?

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

Thank you, Mr Speaker and the Honourable Member for Lambir. Allow me to answer Question 164 together with Question 214 from the Honourable Member for Lambir, the only difference being 'Apakah' and 'Adakah' for the same subject. So, anyway you have two supplementary question.

Encik Ripin Bin LamatPBB · GPSLambir

Do I get four? (laughter)

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

The answer is that, for the information of the Honourable Member for Lambir, the Natural Resources and Environment Board (NREB) together with the Miri City Council have taken appropriate steps to minimise the environmental pollution originating from the disposal site as follows;

(a) Improvement of the Leachate Treatment Plant (LTP) to treat seepage water before it is discharged into the tributary. So far, the LTP has been fully operational. (b) Covering active cells with soil to reduce odour pollution. (c) Monitoring the disposal site from time to time to ensure its operations follow the guidelines set by the authorities.

Apart from that, the NREB also conducts periodic monitoring every quarter of the disposal site to ensure its operations comply with the conditions of approval of the Environmental Impact Assessment (EIA) and the established guidelines. Thank you.

Encik Ripin Bin LamatPBB · GPSLambirEN

Thank you, Assistant Minister. Before that, Mr Speaker, am I getting four supplementary questions?

Mr SpeakerEN

Two, two. (laughter) Don't be greedy, YB. (laughter)

Encik Ripin Bin LamatPBB · GPSLambirEN

Because two questions have been answered. If following normal order I would get four (laughter)

Mr Speaker

Dua, dua.

Encik Ripin Bin LamatPBB · GPSLambirEN

Ok, thank you. (supplementary question)

Mr Speaker, I have two supplementary questions.

1) Where is the location of water quality monitoring and what parameters are monitored in the river near the Sibuti Landfill? 2) Does the influence or sewage waste discharged by the Sibuti Landfill comply with the prescribed limits?

The reason the issue now, what is very important, is these two questions, are raised together and put forward because this is the biggest problem in the area of the seven villages surrounding the Sibuti Landfill. So, if possible, our actual hope is that this Sibuti Landfill be closed and relocated to an area further away from the village areas. Thank you.

Datu Haji Len Talif SallehPBB · GPSJunior Minister of Urban Planning, Land Administration and Environment · Kuala RajangEN

Thank you, Mr Speaker. Thank you, Honourable Member for Lambir.

The monitoring location at Sungai Subak is from upstream and downstream of the discharge point of Sungai Subak. For the second question, the second supplementary question, the water quality parameters monitored are PH, this is not the political PH, this is technical PH, maybe we will monitor the political PH in another way. Temperature, Free Radical Chlorin, Residual Chlorin, Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand (COD), total suspended solid, oil and grease and metals such as plumbum or lead, led sorry, kuprom which is cooper, zinc, nickel, chromium, iron, manganese and mercury, and all discharges or outflows into this river comply with the lines set out in the conditions of EIA approval. Thank you.

Mr SpeakerEN

The Honourable Member Encik Chukpai Ugon for Murum.

Government Initiatives to Attract Rural Entrepreneurs

(165) YB Encik Chukpai Ugon asked the Minister of Industrial and Entrepreneur Development: What initiatives have been taken by the Government to attract rural entrepreneurs to actively engage in the field of entrepreneurship?

Datuk Haji Naroden Bin Haji MajaisPBB · BNJunior Minister of Small and Medium Enterprise Development and Entrepreneurship · GedongEN

Thank you, Mr Speaker. For the information of the Honourable Member for Murum, it is indeed the aspiration of the Sarawak Government to increase the participation of the community, whether in urban and rural areas, to engage in the field of entrepreneurship. This is evidenced by the implementation of various entrepreneurship initiatives and programmes to enhance the capacity and capability of our entrepreneurs. Among these initiatives and programmes are entrepreneurship training, fund assistance, provision of business infrastructure and advisory services, and so on.

Among the programmes and assistance provided by my Ministry are as follows:

(a) Small and Medium Industries Loan Scheme (SPIKS); (b) Graduates Towards Entrepreneurship (GERAK); (c) Technical and Vocational Entrepreneurs (USTEV); (d) Skills Training and Centralised Training; (e) Contractor Entrepreneurs Symposium; (f) Entrepreneurship Roadshow; (g) Sarawak Entrepreneurs Roadshow; (h) Entrepreneur Hubs and Industrial Estates; and (i) Sarawak Product Pavilion in Kuala Lumpur.

Apart from that, other agencies such as MITEC, the Sarawak Ministry of Community Wellbeing, Women, Family and Childhood Development, the Sarawak Ministry of Agricultural Modernisation, the Malaysian Handicraft Development Corporation, AIM, TEKUN, MARA, SME Corp, MATRADE, the Ministry of Domestic Trade, Co-operatives and Consumerism (KPDNHEP) and so on also provide various types of programmes and initiatives to help enhance the capacity and capability of our local entrepreneurs.

For the purpose of product development and commercialisation (product development and commercialization), the Sarawak Government has provided R&D and pilot plant testing facilities, as well as an incubator at Biovalley Park in Miri. Entrepreneurs are encouraged to use these facilities to improve the quality and market of their products. Thank you.

Encik Chukpai UgonPRS · GPSMurumEN

(Supplementary question) Thank you, Datuk Menteri Muda. Mr Speaker, I have two supplementary questions.

1) What are the Government's plans to help entrepreneurs in rural areas or small villages to expand their businesses, given that the population and purchasing power of rural residents are too small and the distance to towns is too far, such as in the Murum area?

2) How can Biovalley Park in Miri help our small and medium entrepreneurs in Sarawak?

Datuk Haji Naroden Bin Haji MajaisPBB · BNJunior Minister of Small and Medium Enterprise Development and Entrepreneurship · GedongEN

Thank you, Mr Speaker and the Honourable Member for Murum. The scenario mentioned by the Honourable Member for Murum just now, where rural areas have small, scattered populations, very low purchasing power, and are very far from large markets. So, such a scenario is indeed seen as a major factor that weakens the spirit of our entrepreneurs in rural areas or in the villages to engage in the field of entrepreneurship.

Compared with the situation in urban areas, where the population is many times larger, and the population is mostly salaried, and they have very high purchasing power and surely they have the same needs and wants as us in rural areas. They need agricultural-based food products, they need fish and vegetables, they need handicrafts, they need clothing and so on. So, the needs in urban areas are very high compared with rural areas, and these needs can mostly be produced from rural areas. So, rural residents should view the situation in urban areas as an opportunity for them to meet the wants and needs of the large community in urban areas. So what is important is that our people in the villages and rural areas must work closely with Government agencies that implement any entrepreneurship or agricultural programmes, product processing and so on, so that they benefit from the programmes provided by the Government.

So, for Biovalley Park in Miri, it is designed (design) to provide R&D facilities that can help our small and medium entrepreneurs in the State of Sarawak. It also provides R&D facilities for product development through pilot new products where it can identify product components, it can determine the life span of the product, help us with packaging and much more. So we ask our entrepreneurs in rural areas to fully use this Biovalley Park Research Centre, and it can also provide incubator facilities for new entrepreneurs and contract R&D facilities for institutions and agencies that conduct R&D in the State of Sarawak. Thank you.

Mr Speaker

Ahli-Ahli Yang Berhormat, the question time is up. Ahli Yang Berhormat for Kota Sentosa, the attention of the Dewan had been drawn this morning to the speech you have made

yesterday. This was raised by the Honourable Member for Mambong. Your speech was recorded on page 34 of today’s hansard. Your speech reads, “I know he is on your side. He is working together with PBB but as far as SUPP, PRS, PDP is concerned I don’t know, are they going for your neck, be careful. But he is working with PBB anyway, okay. Alright, so I don’t think you will be taking any action against him”. The Honourable Member raised this violate Standing Order 32(6) and also 32(4) It shall be out of order to use offensive and insulting language about members of the Dewan. 32(6) No member shall impute improper motives to any other member or make any statement or allegation.

The Honourable Member for Mambong would like you to withdraw and for this statement to be expunged from the hansard.

Encik Chong Chieng JenDAP · PHKota Sentosa

Tuan Speaker, 32(6) No member shall impute improper motives to any other member or make any statement or allegation which the said member is not prepared to substantiate. The issue here is whether am I prepared to substantiation. That’s number one. Number two, if you are making allegations against me, Honourable Member from Mambong is it, is making allegation against me for imputing improper motive, may I know which part of the text as Tuan Speaker, you have read out the whole thing, the whole paragraph of my debate, and may I know which part of my debate constitute improper motive and sting of the improper motive so that I can substantiate it.

On the issue of 34 bracket, which bracket?

Mr Speaker

32(4).

Encik Chong Chieng JenDAP · PHKota Sentosa

32(4) yes. Order to use offensive and insulting language.

Mr Speaker

Going for your neck means you are going to kill, he’s going to kill.

Encik Chong Chieng JenDAP · PHKota Sentosa

Tuan Speaker, that is a figurative of speech. Come on, of course we know that this is not literally killing. I am not saying this is literally.

Mr Speaker

It is not literally killing but the intent is to finish you off.

Encik Chong Chieng JenDAP · PHKota Sentosa

Politically what is wrong with that? What is so wrong about politically they are going to finish you off?

Mr Speaker

So, you are not prepared to withdraw?

Encik Chong Chieng JenDAP · PHKota Sentosa

No, Tuan Speaker, what is so offensive about that? You guys are saying you will be wiped out, you will be wiped out. You guys are making allegation against PH, people will vote you out. So how, what is so offensive about that? Tuan Speaker, are you saying that is offensive or insulting?

Mr Speaker

Insulting, offensive. This allegation is directed personally at the Honourable Member for Bawang Assan.

Encik Chong Chieng JenDAP · PHKota Sentosa

Honourable Member for Bawang Assan is not making any complaint.

Mr Speaker

By Honourable Member for Mambong, this is brought up by Honourable Member for Mambong.

Encik Chong Chieng JenDAP · PHKota Sentosa

But Honourable Member for Bawang Assan, is Honourable Member for Bawang Assan making a complaint? Maybe Honourable Member for Mambong is just busybody.

Dato Sri Wong Soon KohPSBMinister of International Trade and E-Commerce and Minister of Finance II · Bawang Assan

Tuan Speaker, Honourable Member if you are not prepared to withdraw the statement, I will move a Motion to that effect against you. Okay.

Encik Chong Chieng JenDAP · PHKota Sentosa

Tuan Speaker, if Honourable Member for Bawang Assan would like to state that he is not going to finish off or going for the neck of SUPP, PRS, PDP, okay I accept that. So, I’ll withdraw that part if it is confirmed that he is not going for the neck of SUPP or the other component parties. But his action is saying that he’s grabbing their members, their elected reps. That gives the perception to the people, to the public that you are going for them. And then he is also, there is also a statement saying that they will be contesting on the areas where all these SUPP, PRS, PDP are contesting. Is that not going after them? When you are in the same Cabinet, you are supposedly to be in the same coalition, the same side, but you are saying that you are going to contest in the areas where your partners are contesting. Is that not going after them? That is a fair comment, Tuan Speaker, and that I don’t think it’s insulting language. Insulting language is something that is derogatory, that is not acceptable. If a comment on a political intention of a party is insulting, that cannot be accepted.

Mr Speaker

When you said he is working for PBB, going for your neck, there is a conspiracy, isn’t it? Isn’t it?

Encik Chong Chieng JenDAP · PHKota Sentosa

Yes, okay, that part, maybe PBB is not working with them, but his action is going for PRS, SUPP, isn’t that true? Are you going for their area? Are you going to contest in their areas, of SUPP, PRS and PDP? SUPP, I am trying to do you a favour, you know. If he states, if Honourable Member for Bawang Assan states in this House that he is not going to contest in the areas of PRS, PDP and SUPP, then I’ll withdraw that. Then it is a misconception on my part.

Mr Speaker

First, you say he is working with PBB, there is a conspiracy ...(interruption)...

Encik Chong Chieng JenDAP · PHKota SentosaEN

Tuan Speaker, Tuan Speaker ...(interruption)...

Mr Speaker

Hang on, hang on, there is a conspiracy. Then the violence of language you used, “he is going for your neck!” Now, take it in its entirety and in total.

Encik Chong Chieng JenDAP · PHKota SentosaEN

(Laughing) Okay, okay, alright.

Mr Speaker

And then you finished your sentence by saying to the Deputy Speaker, “You are not going to take action against him, would you?” Meaning to confirm the conspiracy.

Encik Chong Chieng JenDAP · PHKota Sentosa

Tuan Speake...(interruption)...

Mr Speaker

Either you withdraw or you don’t, then I’ll leave it to the Minister to move a Motion.

Encik Chong Chieng JenDAP · PHKota Sentosa

Tuan Speaker, okay, let me have my say first. You know, the Cabinet Minister’s post is the prerogative of the Chief Minister, Tuan Speaker. When there is a Minister in the Cabinet belonging to one party, going after the parties where other Ministers belongs, then I think there is an obvious ...(interruption)...

Mr Speaker

Conspiracy?

Encik Chong Chieng JenDAP · PHKota Sentosa

No, no, no. There is obviously a fight going on between the Ministers, the parties, and the Chief Minister is not doing anything. So that’s why I say, okay ...(interruption)...

Mr Speaker

Are you going to withdraw or not?

Encik Chong Chieng JenDAP · PHKota Sentosa

Alright, I’ll withdraw that part on the conspiracy part.

Mr Speaker

No, the whole thing, until “you would not take action against him, would you?” Would you withdraw or not?

Encik Chong Chieng JenDAP · PHKota Sentosa

Okay, I withdraw that, I withdraw that.

Mr Speaker

You withdraw? Then that is to be expunged?

Encik Chong Chieng JenDAP · PHKota Sentosa

You can expunge it, that doesn’t matter, you can do whatever you want, Tuan Speaker, that is your prerogative.

Mr Speaker

I hereby direct the Secretary to do the administrative action to expunge.

Encik Chong Chieng JenDAP · PHKota Sentosa

But are you going to contest in areas of SUPP if PartiBersatu Sarawak contests in SUPP area, PRS area, PDP area? And for that ...(interruption)...

Mr Speaker

No, Honourable Minister, you don’t need to reply.

Encik Chong Chieng JenDAP · PHKota Sentosa

Are you ready to reply? Okay, okay, never mind. You see, the conspiracy theory is there, the conspiracy theory is there. It’s okay, it’s okay, alright, alright.

Mr Speaker

Because the Minister is not making the statement, you are.

Encik Chong Chieng JenDAP · PHKota Sentosa

Alright, alright, okay, never mind, never mind. I’ll withdraw that. You want to expunge, you expunge. It doesn’t matter.

Mr Speaker

Okay, the statement is withdrawn. I hereby direct the Secretary to take the administrative action to expunge the statement.

Supplementary Supply (2018) Bill, 2019Bill

Dato Sri Wong Soon KohPSBMinister of International Trade and E-Commerce and Minister of Finance II · Bawang Assan

Tuan Speaker, I beg to move that the Supplementary Supply (2018) Bill, 2019 as contained in Command Paper No. 1 of 2019 laid on the Table on the 29th of April 2019 be read a second time.

The Second Supplementary Estimates of Ordinary Expenditure, 2018 as contained in Command Paper No.1 of 2019 comprising an additional sum of RM148,626,874.00 is laid before the House in pursuant to Article 32 of the State Constitution. This additional expenditure is to meet the cost of various Ministries and Departments for which funds were not provided for or insufficiently provided for in the 2018 estimates.

Details of the additional expenditure is provided in Command Paper No.2 of 2019.

Tuan Speaker, I beg to move.

Mr Speaker

Another Minister to second?

Dato Sri Hajah Fatimah AbdullahPBB · GPSMinister of Welfare, Community Wellbeing, Women, Family and Child Development · Dalat

I beg to second.

Mr Speaker

Honourable Member for Dalat.

The question is that the Supplementary Supply (2018) Bill, 2019 be read a second time.

Mr Speaker

As many as are of the opinion say “Yes”.

Government: Yes.....(Resounding “Yes”).

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No.....(Murmuring “No”).

Mr Speaker

The “Yes” have it. The Bill is read a second time.

Motion to bring the Resolution on Second Supplementary Development Expenditure Estimates 2018 to the Committee of SupplyMotion

Dato Sri Wong Soon KohPSBMinister of International Trade and E-Commerce and Minister of Finance II · Bawang Assan

Tuan Speaker, I beg to move that the following Motion be referred to the Committee of Supply:

That this Dewan resolves to refer to the Committee of Supply the Second Supplementary Estimates of Development Expenditure, 2018 as contained in Command Paper No. 3 of 2019 laid on the Table on 29th April 2019.

Command Paper No. 3 of 2019 is laid before the House in pursuant to Section 4(2) of the Development Funds Act, 1966.

As presented therein, there are 90 sub activities and 171 sub-sub activities for which the additional provisions are required. The total additional allocation required is RM48,856,085. The amount required has been vired from savings among the subheads concerned or advance from Contingencies Advance. The additional allocation is to meeet the following Heads of Expenditure:-

Heads of Expenditure

Amount (RM) Head P.01 – Land Infrastructure 130 Head P.02 – Riverine Infrastructure 10 Head P.04 – Public Buildings 20 Head P.05 – Public Utilities 130 Head P.07 – Land Compensation and Residential Extension 40 Head P.08 – Urban Development 30,519,000 Head P.09 – Industrial Development 50 Head P.11 – Local Authorities 800 Head P.12 – Natural & Cultural Heritage 10 Head P.13 – Public Finance 17,500,030 Head P.14 – Planning And Development 60 Head P.15 – Knowledge Society (K-Society) Development 90 Head P.18 - Tourism 835,565 Head P.21 – Crop Agriculture 70 Head P.22 – Inland Fisheries and Aquaculture Development 30 Head P.24 – Agriculture Development 50 Total 48,856,085

Details on the additional expenditure is provided for in Command Paper No. 4 of 2019.

Tuan Speaker, I beg to move.

Mr Speaker

Another Minister to second.

Dato Sri Hajah Fatimah AbdullahPBB · GPSMinister of Welfare, Community Wellbeing, Women, Family and Child Development · Dalat

I beg to second.

Mr Speaker

Ahli Yang Berhormat, the question before the Dewan is that the Motion standing in the Order Paper in the Name of the Minister for Finance II be referred to the Committee of Supply.

Mr Speaker

As many as are of the opinion say “Yes”.

Government: Yes.....(Resounding “Yes”).

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No.....(Murmuring “No”).

The “Yes” have it. The Motion is agreed. The Dewan shall now resolve into the Committee of Supply to consider the Supplementary Supply (2018) Bill, 2019 and the Motion on the Second Supplementary Estimates of Development Expenditure, 2018.

Committee Stage

Mr Speaker

[COMMITTEE OF THE WHOLE HOUSE]

[Tuan Pengerusi mempengerusikan Mesyuarat]

Mr Chairman

Honourable Members, we are now considering Command Paper No. 1 and No. 3 of 2019 together with the Supplementary Supply (2018) Bill, 2019. Honourable Members, we shall now consider Command Paper No. 1 of 2019. The question is that the amount in all Heads as set forth in the Second Supplementary Estimates of Ordinary Expenditure 2018 be approved.

Mr Chairman

As many as are of the opinion say “Yes”

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many are of the contrary opinion say “No”.

Opposition: No.....(Murmuring “No”).

Mr Chairman

The “Yes” have it. The Second Supplementary Estimates of Ordinary Expenditure 2018 is approved. Honourable Members, we shall now consider Command Paper No. 3 of 2019. The question is that the amount in all Heads as set forth in the Second Supplementary Estimates of Development Expenditure 2018 be approved.

Mr Chairman

As many as are of the opinion say “Yes”

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as are of the contrary opinion say “No”.

Opposition: No.....(Murmuring “No”).

Mr Chairman

The “Yes” have it. The Second Supplementary Estimates of Development Expenditure 2018 is approved. We shall now consider the Supplementary Supply (2018) Bill, 2019.

The Schedule

Mr Chairman

The question is that the Schedule be ordered to stand part of the Bill. As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as are of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Chairman

The “Yes” have it. The Schedule is ordered to stand part of the Bill.

Clause 1 and 2

Mr Chairman

The question is that Clauses 1 and 2 be ordered to stand part of the Bill. As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as are of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Chairman

The “Yes” have it. Clause 1 and 2 are ordered to stand part of the Bill.

Enacting Clauses and Title

Mr Chairman

The Dewan shall now resume.

House Resumed

Mr ChairmanEN

[The Chairman presides over the Sitting]

Dato Sri Wong Soon KohPSBMinister of Finance II · Bawang Assan

Tuan Speaker, I wish to report that the Committee of Supply has considered the Supplementary Supply 2018 Bill, 2019; the Second Supplementary Estimates of Ordinary Expenditure, 2018, and the Second Supplementary Estimates of Development Expenditure 2018 and agreed to without amendment.

Government Bill – Third ReadingBill

Dato Sri Wong Soon KohPSBMinister of Finance II · Bawang AssanEN

SUPPLEMENTARY SUPPLY (2018) Bill, 2019

Dato Sri Wong Soon KohPSBMinister of Finance II · Bawang Assan

Tuan Speaker, I beg to move that the Supplementary Supply (2018) Bill, 2019 be now read a third time and do pass.

Mr Speaker

Ahli-ahli yang Berhormat, the question before the Dewan is that this Supplementary Supply (2018) Bill, 2019 be read a third time and do pass.

Mr Speaker

As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Speaker

The “Yes” have it. The Bill is read a third time and passed

Motion to approve the Second Supplementary Development Expenditure Estimates 2018Motion

Dato Sri Wong Soon KohPSBMinister of Finance II · Bawang Assan

Tuan Speaker, I beg to move that this Dewan resolves to approve the Second Supplementary Estimates of Development Expenditure 2018 as contained in Command Paper No. 3 of 2019 as laid on the Table on 29th April 2019.

Mr Speaker

Another Minister to second.

Dato Sri Hajah Fatimah AbdullahPBB · GPSMinister of Welfare, Community Wellbeing, Women, Family and Child Development · Dalat

Tuan Speaker, I beg to second.

Mr Speaker

Ahli-Ahli Yang Berhormat, the question before the Dewan is that the Dewan resolves to approve the Second Supplementary Estimates of Development Expenditure 2018 as contained in Command Paper No. 3 of 2019 as laid on the Table on 29th April 2019 be approved.

Mr Speaker

As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Speaker

The “Yes” have it. The Motion is approved.

Government Bill – Second ReadingBill

Mr SpeakerEN

SUPPLEMENTARY SUPPLY (2019) Bill, 2019

Dato Sri Wong Soon KohPSBMinister of Finance II · Bawang Assan

Tuan Speaker, I beg to move that the Supplementary Supply (2019) Bill, 2019 as contained in Command Paper No. 5 of 2019 laid on the Table on 29th April 2019 be read as second time.The First Supplementary Estimates of Ordinary Expenditure 2018 as contained in the Command Paper No. 5 of 2019 comprising an additional sum of RM110,488,202.00 is laid before the House in pursuing to Article 32 of the State Constitution. This additional expenditure is to meet the following:

(a) A sum of RM50 million is for contribution to Statutory Funds for appropriation to the Front-End Engineering Trust Fund.

(b) A total sum of RM60,488,202 is required to cater for the various expenditures under Ministry and Department as follows:

(i) A sum of RM10,488,202 is required by the Department of Veterinary Services for Rabies Operation and Eradication Programme 2019; and

(ii) A sum of RM50,000,000 is required by Ministry of Welfare, Community Wellbeing and Women, Family and Childhood Development for the following:

• Sarawak Newborn Incentive (Endowment Fund Sarawak) amounting to RM37,000,000; and

• Special Annual Grant for Early Childhood Care and Education (ECCE) Institutions amounting to RM13,000,000.

Details of the additional expenditure are provided for in Command Paper No. 6 of 2019.

Tuan Speaker, I beg to move.

Mr Speaker

Another Minister to second.

Dato Sri Hajah Fatimah AbdullahPBB · GPSMinister of Welfare, Community Wellbeing, Women, Family and Child Development · Dalat

Tuan Speaker, I beg to second.

Mr Speaker

The question is that the Supplementary Supply (2019) Bill, 2019 be read a second time. As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Speaker

The “Yes” have it. The Bill is read a second time.

SUPPLEMENTARY SUPPLY (2019) Bill, 2019

Motion to bring the Resolution on First Supplementary Development Expenditure Estimates 2019 to the Committee of SupplyMotion

Dato Sri Wong Soon KohPSBMinister of Finance II · Bawang Assan

Tuan Speaker, I beg to move that the following Motion be referred to the Committee of Supply. That this Dewan resolves to refer to the Committee of Supply the First Supplementary Estimates of Development Expenditure, 2019 as contained in Command Paper No. 7 of 2019 laid on the Table on 29th April 2019.

Command Paper No. 7 of 2019 is laid before the House in pursuant to Section 4(2) of the Development Funds Act, 1966. As presented therein, there are five sub-activities and five sub-sub activities for which the additional provisions are required.

The total additional allocation of RM231,236,420 is required to meet expenditures as follows:

(a) A sum of RM18,217,500 is required by the Ministry of Urban Development and Natural Resources for the following projects:

(i) Purchase and installation of Global Navigation Satellite System (GNSS) hardware under Contract Survey amounting to RM6,217,500;

(ii) Implementation of Kampung Sadong Jaya extension scheme amounting to RM6,000,000; and

(iii) Implementation of Kampung Bruit extension scheme amounting to RM6,000,000.

(b) A sum of RM13,018,620 is required under P.13 – Public Finance for the Proposed Renovation and Improvement Works at the Sarawak Cultural Village for Rainforest World Music Festival 2019; and

(c) A sum of RM200,000,000 is required under P.29 – Special Projects for the implementation of various Projek Rakyat throughout the State.

Details on the additional expenditure are provided in Command Paper No. 8 of 2019.

Tuan Speaker, I beg to move.

Mr Speaker

Another Minister to second.

Dato Sri Hajah Fatimah AbdullahPBB · GPSMinister of Welfare, Community Wellbeing, Women, Family and Child Development · Dalat

Tuan Speaker, I beg to second.

Mr Speaker

Ahli-Ahli Yang Berhormat the question before the Dewan is that the Motion Standing in the Order Paper in the name of the Minister of Finance II be referred to the Committee of Supply.

Mr Speaker

As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No.... (Murmuring No).

Mr Speaker

The “Yes” have it, the Motion is agreed. The Dewan shall now resolve into the Committee of Supply to consider the Supplementary Supply (2019) Bill, 2019 and the Motion on the First Supplementary Estimates of Development Expenditures 2019.

Committee Stage

Mr Speaker

[COMMITTEE OF THE WHOLE HOUSE]

Mr Chairman

Honourable Members, we are now considering Command Paper No.5 of 2019 together with the Supplementary Supply (2019) Bill, 2019. Honourable Members, we shall now consider Command Paper No. 5 of 2019. The question is that the amount in all Heads as set forth in the First Supplementary of Ordinary Expenditure 2019 be approved.

Mr Chairman

As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Chairman

The “Yes” have it. The First Supplementary of Ordinary Expenditure 2019 is approved. Honourable Members, we shall now consider Command Paper No.7 of 2019. The question is that the amount in all Heads as set forth in the First Supplementary Estimates of Development Expenditure 2019 be approved.

Mr Chairman

As many as are of the opinion say “Yes”

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Chairman

The “Yes” have it. The First Supplementary Estimates of Development Expenditure 2019 is approved. We shall now consider the Supplementary Supply (2019) Bill, 2019.

The Schedule

Mr Chairman

The question is that the Schedule be ordered to stand part of the Bill.As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Chairman

The “Yes” have it. The Schedule is ordered to stand part of the Bill.

Clauses 1 and 2

Mr Chairman

The question is that the Clauses 1 and 2 be ordered to stand part of the Bill. As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Chairman

As many as of the contrary opinion say “No”.

Opposition: No...(Murmuring “No”)

Mr Chairman

The “Yes” have it. Clauses 1and 2 are ordered to stand part of the Bill.

Enacting Clauses and Title

Mr Chairman

The Dewan shall now resume.

House Resumed

Mr ChairmanEN

[Mr Speaker presides over the Sitting]

Dato Sri Wong Soon KohPSBMinister for Finance II · Bawang Assan

Tuan Speaker, I wish to report that the Committee of Supply has considered:

(a) The Supplementary Supply (2019) Bill, 2019; (b) The First Supplementary Estimates of Ordinary Expenditure 2019; and (c) The First Supplementary Estimates of Development Expenditure 2019; (d) and agreed to without amendment.

Supplementary Supply (2019 Bill, 2019)Bill

Dato Sri Wong Soon KohPSBMinister for Finance II · Bawang Assan

Tuan Speaker, I beg to move that the Supplementary Supply (2019) Bill, 2019 be now read a third time and do pass.

Mr Speaker

The question before the Dewan is that the Supplementary Supply (2019) Bill, 2019 be read a third time and do pass. As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No... (Murmuring “No”)

Mr Speaker

As many as are of the contrary opinion say “No”. The “Yes” have it. The Bill is read a third time and passed.

Motion to approve the First Supplementary Development Expenditure Estimates 2019Motion

Dato Sri Wong Soon KohPSBMinister for Finance II · Bawang Assan

Tuan Speaker, I beg to move: “That this Dewan resolves to approve the First Supplementary Estimates of Development Expenditure 2019 as contained in Command Paper No.7 of 2019 as laid on the Table on 29th April 2019.”

Mr Speaker

Another Minister to second.

Dato Sri Hajah Fatimah AbdullahPBB · GPSMinister of Welfare, Community Wellbeing, Women, Family and Child Development · Dalat

Tuan Speaker, I beg to second.

Mr Speaker

Ahli-ahli Yang Berhormat, the question before the Dewan is that the Dewan resolves to approve the First Supplementary Estimates of Development Expenditure 2019 as contained in Command Paper No.7 of 2019 as laid on the Table on 29th April 2019 be approved. As many as are of the opinion say “Yes”.

Government: Yes...(Resounding “Yes”)

Mr Speaker

As many as are of the contrary opinion say “No”.

Opposition: No... (Murmuring “No”)

Mr Speaker

The “Yes” have it. The motion is approved.

Continuation of debate on the Motion of Thanks for the Speech of Tyt Yang di-Pertua Negeri of SarawakMotion

Mr Speaker

Any Honourable who wish to speak? Honourable Member for Beting Maro.

Tuan Haji Razaili Bin Haji GaporPBB · GPSBeting MaroEN

Jasmine bud blooming and creeping, I recline beneath the casuarina tree. Assalamualaikum, the words that open, A salutation, the opening of my speech.

Thank you, Mr Speaker, for giving me the opportunity to take part in debating the Motion of Thanks for the address of His Excellency the Yang di-Pertua Negeri Sarawak at the Opening of the First Meeting of the Fourth Session of the 18th Dewan Undangan Negeri Sarawak on Monday, 29 April 2019.

His Excellency's speech at this meeting touched on many matters covering various fields: economic development and transformation, unity and harmony of the people, rural transformation, basic infrastructure development and people's welfare, human capital development, the Government's service delivery system, and the struggle of the people and the State Government to claim the rights of the State of Sarawak as enshrined in the Malaysia Agreement 1963 (MA63).

Mr Speaker, we are fortunate to have a leader like YAB Ketua Menteri, who is visionary, ambitious, forward thinking, smart, courageous, and has high determination and commitment to bring the people and the State of Sarawak to become a high-income developed state by 2030.

The people of Sarawak must unite in the diversity of opinions and beliefs. The loyalty and spirit of the sons of the soil of Sarawak, Sarawak first, Sarawak prioritised, will be tested and must have the courage to reject political parties which, in principle and history, were never established to safeguard the interests of the people of Sarawak. The State Government, supported by local parties, understands the needs of the people of Sarawak better than parties from outside. We do not need outside parties to determine the fate and direction of this state, because the people of Sarawak are themselves clever and capable enough to do so.

Mr Speaker, the question is, Sarawak's development is still far behind other states. Where are justice and equality? The need to develop the State of Sarawak constantly increases from time to time. It requires good planning and management of financial resources. Thank you to YAB Ketua Menteri for taking the bold step of introducing a 5% tax on petroleum products for export purposes. The revenue from this tax is estimated at 3.8 billion a year and will be an important source of finance to fund development in this state.

Such large allocations enable various high-impact and People-Centric projects to be implemented to meet the needs of the people. The implementation of rural transformation projects and people's projects has provided infrastructure, utilities and telecommunications facilities in rural areas.

Mr Speaker, on behalf of the people of DUN Beting Maro, I thank the Government for approving the construction of the Batang Lupar Bridge, the Batang Saribas Bridge and the Batang Krian Bridge. I also hope the Government can upgrade the village link road from Pusa/Batang Maro road to R3 type, which is estimated by the Public Works Department (JKR) at a cost of RM35 million.

I also hope the Government can upgrade the Loji Pusa/Rumah Kam Blok link road to R3 type, and build a new road from Tanjung Lilin Beladin to Tanjung Asam. The implementation of this coastal road network, which has been long awaited, will have a positive impact and open economic opportunities for people in coastal areas. Besides road networks, telecommunications and internet access are also important means of communication. In this regard, I also request the Government to improve the telecommunications infrastructure in DUN Beting Maro by providing more telecommunication towers, broadband centres, wifi and internet centres that will improve internet access.

Establishment of Regional Development Agencies

Mr Speaker, we are aware of the major challenges faced by the Government in bringing development to the whole of the State of Sarawak. I support the new and innovative approach of the Chief Minister in planning and accelerating regional development in this state. Through the establishment of the Upper Rajang Development Agency (URDA), Highland Development Agency (HDA), Northern Region Development Agency (NRDA) and Integrated Regional Samarahan Development Agency (IRSDA), by the Government with allocations of RM1.5 billion each, we are confident that the implementation of development projects in those regions can be accelerated.

I hope this regional development can be extended to other regions in this state. This innovative approach focuses on efforts to provide infrastructure and develop economic potential more aggressively. This is in line with efforts to accelerate balanced development in the State of Sarawak.

Mr Speaker, the Betong-Sarikei regional area, including DUN Beting Maro, Saribas, Bukit Saban, Layar, Kabong, Krian, Kalaka, and Sarikei, is an area with peat soil, hills, and extensive coastal and marine waters. This area is rich in marine biodiversity and nipah forest that has not been fully explored. However, this area still lacks basic infrastructure facilities, especially clean water supply, electricity supply, and agricultural infrastructure.

In this regard, the Government is proposed to consider establishing a Regional Development Agency in the Batang Saribas/Batang Krian Valley covering the Betong-Sarikei area (such as URDA, HDA, NDA and IRSDA), which is responsible for planning and further accelerating economic and infrastructure development in an orderly, focused and planned manner, including R&D activities on bio-marine and bio-herb resources. This will certainly further boost the agricultural sector and stimulate a bio-economy that has the potential to increase the income of rural residents in this area. The establishment of the Betong-Sarikei Regional Development Agency is timely, considering that the Government has agreed to make the Betong-Sarikei area a Food Basket for Sarawak.

Strengthening Agricultural Development

Mr Speaker, I support the Government's aspiration to become an exporter of agricultural produce and products to meet domestic and global market demand. This vision can be achieved by transforming agriculture into a modern, competitive and sustainable sector capable of generating new innovative businesses and high-value employment opportunities. The agricultural sector needs to be modernised and commercialised through the utilisation of advanced technology.

I place high hopes in Honourable Datuk Amar Menteri Pemodenan Pertanian, Tanah Adat dan Pembangunan Wilayah, the Minister of Modernisation of Agriculture, Native Land and Regional Development, to transform the agricultural sector of this state. Sarawak still depends on imports of food for its people's needs. It is estimated that Sarawak imports RM4.4 billion of food a year and experiences a trade balance deficit of RM2.7 billion.

Coastal residents such as those of Beting Maro, who face problems in developing the agricultural sector, really need special attention from the Government. They urgently need agricultural infrastructure such as farm roads, water control and drainage systems for opening agricultural land free from the threat of salt water. This effort is expected to increase agro-food production many times over, towards making Beting Maro in particular and the Betong-Sarikei Region in general a food basket for Sarawak.

The provision of agricultural infrastructure, especially irrigation and drainage systems together with river bank protection barriers and farm roads, can open opportunities for land development in Beting Maro with large-scale commercial crops such as MD2 Premium Pineapple, Pandan Coconut, Matag and Tacuan Coconut, coffee, paddy, pepper, as well as fruit crops such as Musang King durian, lime and mango.

I would like to take this opportunity to extend my highest thanks and appreciation to MANRED and also IADA (Integrated Agricultural Development Area) Kalaka-Saribas Betong for developing the MD2 pineapple plantation in my area. To add economic value and additional income for farmers, the Government is requested to develop the Agro-Based Industry, especially by taking into account the glut periods when harvest prices collapse. The construction of a Collection, Processing and Packaging Centre for Agricultural Products (CPPC) and an Anjung Usahawan (Entrepreneur Hub) in Beting Maro will help in marketing these agricultural products more effectively.

Mr Speaker, at the same time, it is acknowledged that Kampung Tambak is well known as the largest producer of quality gula apong in Malaysia. I ask the Government to continue developing gula apong production as a viable agro-food industry. In this regard, I would like to request and propose that the Government develop the Nipah and Gula Apong Tambak Industrial Park as an effort to protect, develop and enhance the production of nipah products such as gula apong and apong syrup, vinegar and apong salt. In addition, this park can be used as a reference, training and research centre for the nipah industry.

I request that a modern processing factory, equipped with equipment that meets international food standards and certification, be built in this Nipah Industrial Park. Nipah has the potential to become a high-value strategic crop and a lucrative source of income for communities along the coastal riverbanks of Sarawak.

To the Ministry of Modernisation of Agriculture, Native Land and Regional Development (MANRED), I would also like to request that the following initiatives and projects be implemented in the Beting Maro area:-

(a) Implementing and developing an Aquaculture Industrial Zone (ZIA) along the riverbank fringes; (b) implementing pineapple, coconut, banana and rumbia plantation projects; (c) implementing an IoT-based fertigation project; (d) implementing goat, cattle, chicken and duck farming projects; and (e) implementing a seedling nursery project and a compost fertiliser production project.

Mr Speaker, allow me to elaborate on several issues requiring the attention of this House, especially those involving the needs of the area and people of DUN Beting Maro, in the hope that they will be given attention and action.

Pusa People's Housing Project, Rumah Mampu Milik (RMM) and Rumah Spektra Permata (RSP)

I welcome the Government's efforts to safeguard the welfare of the people through the provision of 1,827 units of Rumah Mampu Milik and Rumah Spektra Permata (RSP) in 2019 for the benefit of low-income groups. In this regard, I urge and request that the Government and the Housing Development Corporation (HDC) redevelop the old Pusa people's housing project, which has long stalled, focusing on the construction of Rumah Mampu Milik (RMM) and Rumah Spektra Permata (RSP).

Village Enlargement Scheme

At the same time, there is a need to implement a village enlargement scheme for Kampung Pusa, Beladin, Tambak, Spinang and Semarang: the provision of an orderly residential lot site equipped with infrastructure, and comfortable and affordable houses for the people. The Government is expected to consider and approve the enlargement projects for these villages so that the second generation of Beting Maro can own their own house lots.

Riverbank Recovery and Flood Mitigation Study

Most village settlements in the DUN N.29 Beting Maro area face river bank erosion, which threatens facilities such as schools, cemeteries and residents' homes with falling into the river or sea. The Government is requested to carry out river bank conservation work in the settlement areas of Kampung Pusa, Kalok, Beladin, Semarang and Spinang. The Department of Irrigation and Drainage is also requested to conduct a flood mitigation study for the Muton-Undai area, which frequently experiences flash floods.

Ladang Rakyat TH Pelita Beladin Maludam

Since this people's plantation project was opened in 2006 by the Government through PELITA together with Tabung Haji, it has yet to produce the results expected as planned. Disputes relating to overlapping land claims by landowners within this people's plantation area remain unresolved. In this regard, I urge and request the Government to take steps to resolve this matter promptly for the welfare of the people of Beting Maro.

Fish Landing Complex

I also want to know the status of the construction project of the Malaysian Fisheries Development Authority (LKIM) Beladin Fish Landing Complex, which has been delayed beyond schedule. This project is an important facility for the economic progress of the people of Beting Maro.

New Pusa District Administrative Complex and Sports Complex

As one of the full districts, the Pusa district will play a major role in helping the Government develop the area and the people of DUN Beting Maro more effectively. In this regard, the Government is requested to build a new administrative complex and a Pusa District Sports Complex to cater for the needs of the residents of this district.

New Construction of SK Kalok and SK Tambak

I also welcome the Government's efforts to help resolve the issue of dilapidated schools in Sarawak. The condition of SK Kalok and SK Tambak, which are dilapidated and in a decrepit state, requires the Government's immediate attention. I hope the Government can provide allocations for the new construction of SK Kalok and SK Tambak. A site for the new SK Kalok has been prepared.

NCR Land Survey

I also welcome the State Government's intention to continue the NCR land survey programme. In this regard, I request the Government to survey NCR land owned by the people within DUN N.29 Beting Maro.

Closing

Mr Speaker, we are grateful that the State of Sarawak remains peaceful and harmonious. The harmony we enjoy today is the result of the attitude of tolerance and close relations among our people, who comprise various ethnic groups, cultures and religions. The spirit of mutual trust and mutual respect has been a solid foundation for the unity of the people of Sarawak since long ago. The Sarawak Government's initiative to establish the Unit For All the Religion (UNIFOR) to safeguard the interests of other religions is very timely given current developments.

Finally, I would like to extend Selamat Menyambut Hari Gawai and Hari Raya Aidilfitri to all who celebrate them. I end my speech with three pantun.

Pineapple fruit, begonia fruit, Coconut fruit, the duku fruit; GPS, sincere in the struggle, Prioritise Sarawak, let the people advance.

A roof broken because of the bamboo, Roof woven with rope; A wing broken, relying on the beak as a crutch, Yet retreat is never an option.

Sarawak, the motherland, Mount Santubong, the legend of a princess; Datuk Speaker, firm, wise and learned, Debate spirited and sincere at heart.

Mr Speaker, I hereby support the Motion of Thanks for the address of His Excellency the Yang di-Pertua Negeri Sarawak at the opening of the First Meeting of the Fourth Session of the 18th Dewan Undangan Negeri Sarawak on Monday, 29 April 2019.

Thank you. Wabillahitaufik Walhidayah Wassalamualaikum Warahmatullahi Wabarakatuh.

Deputy Speaker

Honourable Member for Tamin.

Tuan Speaker, thank you for giving me opportunity to speak in this august House. But before that, please allow me to put in record my utmost and sincere appreciation to Tuan Yang Terutama Yang di-Pertua Negeri Sarawak for his most gracious address during opening of 1st Meeting of 18th State Legislative Assembly on 29th April 2019.

Tuan Yang Terutama address was very inclusive by touching aspects in Sarawak autonomy as stated in the Malaysia Agreement (MA63), mature and political stability, implementation of 65 initiatives by Government of Sarawak, efficiency of government administrative, urban and rural development, introducing new source of income and revenue and digital economy.

Tuan Speaker, I also wish to congratulate our Excellency, Duli Yang Maha Mulia Seri Paduka Baginda, Sultan Abdullah Ri’ayatuddin Al Mustafa Billah Shah Ibni Sultan Haji Ahmad Shah Al Musta’in Billah Shah, on his installation as the 16th Yang di-Pertuan Agong of Malaysia.

Tuan Speaker, since the change of government on 8th May 2018, the PH Government has yet to deliver any of their election promises which they clearly stated in their manifesto. Many asked – what happen to the promised of 20% of oil and gas royalty to Sarawak, revenue of 50% from Tourism Tax to be given back to Sarawak? Where? When is oil price to be reduced immediately to RM1.50 after PH Government took the Putrajaya?

Many of our fresh graduates and those who has PTPTN loan called with frustration when the PH Government did not fulfilled their promise to abolish PTPTN loan. It was even shocking when PH Government announced to close government department namely JASA and then reduce workforce in the civil servants.

To us Sarawakians, the cancellation of infrastructure projects in Sarawak such as building of bridges is yet another disappointment to the Sarawakians. The reason given to us is due to insufficient fund, which is unacceptable. Because not long after the cancellation of the projects in Sarawak, PH (Pakatan Harapan) Government has approved development projects in Peninsular Malaysia that costs billions of Ringgit for example to Kedah and Penang.

Despite the above, I wish to call upon all the PH MP (Member of Parliaments), the new Government of the day especially from Sarawak, especially Yang Berhormat for Ba’Kelalan who is also MP for Selangau and Minister of Works to fight for the funds to be allocated to Sarawak, to create more development in Sarawak. Being MP for Selangau, the people that voted for the Yang Berhormat has high hopes that more opportunity in terms of business and development will be brought to Selangau as Selangau deserves to be given this privilege.

Tuan Speaker, observing the current political scenario under PH Government we see how they managed the country with uncertainty in direction. I read in the Merdeka survey recently, PH Government performance has shown 79% rating in October 2018 and dropped to 39% in April 2019. Which is why Government of Sarawak needs to find their own way to generate the income for Sarawak if we cannot depend on the Federal Government to support us based on their performance as stated recently.

Therefore, Sarawak Government under the leadership of Yang Amat Berhormat Chief Minister, Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari Bin Tun Datuk Abang Haji Openg has introduce 65 initiatives to drive Sarawak’s economy. These initiatives include creating revenue to the State, provide basic infrastructure, incorporate strategic institutions such as Upper Rejang Development Agency (URDA), Northern Region Development Agency (NRDA), Highland Development Agency (HDA), Intergrated Regional Samarahan Development Agency (IRSDA) and so on and not forgetting digital economy and human capital.

I have confidence that the initiatives of Yang Amat Berhormat Chief Minister will generate massive growth in economy to open business opportunities and employment for the people of Sarawak.

Tuan Speaker, Sarawak is a multi-racial and multi-religions State where we live in harmony, respect and tolerance with each other. Extremism in religion is not allowed here. In recent cases, muslims were attacked and shot in mosques in New Zealand. Another incident was of the Churches bombed in Sri Lanka killing many Christians.

We do not want these incidences to happen in Sarawak. Despite our differences, we must continue to instill peace and tolerance among the people living in Sarawak and to reject any element of racism or religion extremist.

Tuan Speaker, during the dinner organised by Persatuan Kontraktor Melayu Sarawak (PKMS) at one local hotel in Kuching recently, Yang Amat Berhormat Ketua Menteri announced that 30% of Government projects in Sarawak is allocated to Bumiputera after considering the request from Dewan Usahawan Bumiputera Sarawak (DUBS), Dayak Chamber of Commerce and Industry (DCCI) and Persatuan Kontraktor Melayu Sarawak (PKMS).

This is a special privilege to assist Bumiputera contractors and consultants as they cannot compete with big players. I fully support Yang Amat Berhormat Chief Minister move as this will give business opportunity to many of our Bumiputera contractors and consultants.

Hence, Tuan Speaker, I wish to recommend to establish independent unit to monitor the 30% of Government projects to be allocated accordingly and this as well for smooth implementation.

Tuan Speaker, since the Government of Sarawak has detached itself from the Barisan Nasional and is now Opposition at the Federal level, Sarawak Government under GPS (Gabungan Parti Sarawak) Government and leadership of Yang Amat Berhormat Ketua Menteri Sarawak has strive to increase economic growth through infrastructure development, introducing sales tax on export of petroleum, promoting business opportunity to attract investors to come to Sarawak and so on. This in turn, will create and generate more income to Sarawak and get more job opportunity to the Sarawakian.

Judging what are currently being done, I have the confident that GPS can lead and protect Sarawak rights and Sarawakians from outsiders. I have confidence Sarawak is able to be a developed State by year 2030.

Tuan Speaker, now let me touch a bit on development in DUN Tamin for the attention for this august House.

Tuan Speaker, on behalf of Tamin folks, I would like to thank Yang Amat Berhormat Chief Minister for his approval for the following projects which are now under tender stage and some under construction stage. The projects are:

(a) Mini Sport Complex Selangau with a cost of RM8 million, now at tender stage; (b) Selangau Waterfront cost of RM5 million, now at tender stage; (c) Upgrading of Jalan Pasai-Siong cost of RM17 million, now is under construction stage; (d) Selangau New District office cost of RM5 million, now is under construction stage; (e) Upgrading of Jalan Sungai Bawang Kemena cost RM2 million, now is under construction stage; and (f) Construction of multipurpose hall to the Chinese School cost of RM500, 000 now under final stage of construction.

I would also like to thank the previous Government under Barisan Nasional for the approved new Balai Bomba in Selangau with a cost of RM5 million which is now under construction stage as well.

Infrastructure – Road

Tuan Speaker, I hereby would like to follow-up on the following roads proposed in DUN Tamin raised in the previous DUN sitting for upgrading of existing road and construction of the new road. Proposed roads for upgrading:

(a) Jalan Nanga Tajam to Nanga Dijih Tamin, Oya Sibu, because this road is on low land and subject flooding so I hope the Minister in charge can look into this road and upgrade to the high level; (b) Jalan Sapudun Balingian, Sibu; and (c) Jalan Rumah Janggit to Rumah Bubong Ulu Dijih Tamin.

Proposed for new roads:

(a) Jalan Rumah Pengarah to Rumah Emong Ulu Mukah, Sibu; (b) Jalan Sk. Pakoh to Nanga Bunau Ulu Oya, Sibu;

(c) Jalan Sk. Nanga Selangau to Rumah Dinggai Ulu Mukah, Sibu; and (d) Jalan Rumah Bubong to Nanga Dijih Tamin Oya, Sibu.

I also wish to appeal that for the abandon logging road to be upgraded from earth road to gravel road which would allow for better access to the public. The affected areas are located at Ulu Oya, Ulu Pakoh, Ulu Mukah and Ulu Selangau.

Water Supply

Tuan Speaker, the Federal Government under previous Barisan Nasional Government has approved a fund amounting to RM40 million to upgrade the existing water treatment plant in Pekan Stapang Sibu and also an additional budget of RM22.5 million for the lying of pipelines. This project will benefit the area of Sekuau, Jalan Nanga Tajam, Batu 36 Tamin up to Kua Ulu Mukah. Despite the change of the Government, I hope this project will be continued and commenced soon because supply of treated water within these areas are in very critical condition.

Tuan Speaker, I was made to understand that the water treatment plant in Selangau town also supplies treated water to the coal plant in Mukah. Therefore, the people from Pekan Selangau to Pekan Arip are unable to have treated water due to low capacity of water treatment plant. Therefore, I would like to suggest the following options:

(a) To disconnect the supply of water to coal plant and let them source the water from Mukah water treatment plant to supply the coal plant in Mukah; or

(b) Government to upgrade the existing water treatment plant in Selangau to increase the capacity and supply the treated water to the community resettling along Sibu-Bintulu road.

Hereby, I appeal to the Government to look into these options seriously since supply of treated water to the community resettling along the Sibu-Bintulu road is in critical condition especially during the dry season, as the community at the moment is depending on rain water and gravity feed water for their daily use.

Electricity Supply

Tuan Speaker, the folks of DUN Tamin appreciates the Government’s effort insupplying electricity to their longhouses. Nevertheless, there are still some longhouses near the power gridline yet to be connected with electricity.

(a) Rumah Randi, Rumah Eding, Rumah Empurung, Rumah Santok, Rumah Utul, Rumah Layang Ulu Manga, Rumah Umar Nanga Palak, Rumah Rose Kampung Sungai Ipoh and private houses along Jalan Didih; (b) Rumah Denny Sebun, Rumah Ansi Sungai Sepiring, Rumah Akat Sungai Arang, Rumah Tawan, Rumah Lumpuh, Rumah Dunak, Rumah Jama, Rumah Ayong, Rumah Kumbong, Sungai Sepudun, Rumah Ambrose Sait, Rumah Johannes and Rumah Enjup Tang Taroh; (c) Rumah Udi, Rumah Randi, Rumah Jabing, Rumah Anthony Nanga Stutong, Ulu Pakoh; (d) Rumah Minggi, Rumah Baie, Rumah Jangan and Rumah Abdul Rahman Jalan Bukit Tanggie, Sibu; (e) Rumah Agnes, Rumah Dindang and Rumah Manjah Batu 20 Jalan Oya Jalan Nanga Sebatu/Kawasan Ulu Selangau; (f) Rumah Akok Jalan Nanga Tajam; (g) Rumah Jimin and Rumah Linggi Sungai Bukut, Balingian; (h) Rumah Rosni, Nanga Nirai, Selangau; and (i) Rumah Tukau Nanga Sebatu, Selangau.

I appeal to the State Government for allocation and to consider these projects as critical and to be given top priority to be implement.

Meanwhile, the longhouses that are unable to receive electricity supply from the power grid line, I suggest alternative to these longhouses under program introduced by Government namely SARES or Solar System.

NCR Land Development

Tuan Speaker, I would like to thank the State Government for the opening of NCR land for development in DUN Tamin especially for oil palm industry. For many years, this industry has been implemented through JV between NCR landowners and private sector. I would like to inform this august House there are about 64,789 hectares of NCR land involving 2,344 participants in DUN Tamin.

Tuan Speaker, I therefore like to request to issue the individual land title to the landowners under Section 18. This is an assurance to their heirs and to avoid land disputes when the JV agreement expire or mature.

I would also like to request to the Government to carry out the perimeter survey under Section 6 and Section 18 for DUN Tamin.

Digital Economy

Tuan Speaker, now I want to touch about Digital Economy. I am in support of the government budget for RM1 billion which was announced during last DUN sitting, allocation to upgrade ICT infrastructure throughout the State, in line with the government policy for digital economy, I wish to request that the people in DUN Tamin to benefits from this budget.

Therefore, Tuan Speaker, it is rightly so if the Government may install more telecommunication tower so as to improve internet access for the community in the DUN Tamin.

Education

Finally, I want to ask about education for DUN Tamin. Tuan Speaker, I request to State Government to repair dilapidated schools in Tamin and to provide with good facilities such as electricity supply from the grid line to the place such as electricity supply from genset, treated water supply, internet access and so on.

I also request to the State Government to relocated the schools which are subject to flood prone and move to the high ground.

I also wish to follow up on the progress of proposed SMK Selangau which was approved by previous Federal Government for an amount of RM88 million on the 7th May 2016 by the former the Deputy Prime Minister, Datuk Sri Zahid Hamidi.

Tuan Speaker, I know the time is up, I conclude my speech and beg to move the Motion of Appreciation to the Tuan Yang Terutama Yang di-Pertua Negeri Sarawak on the 29th April 2019.

Before I end my speech, I would like to wish Sarawakians Selamat Berpuasa to our muslim friends and Selamat Hari Gawai to our fellow Dayaks. Sekian, terima kasih. Sarawak First.

Deputy Speaker

Honourable Member for Dudong.

Datuk Tiong Thai KingBEBAS · BNDudong

Tuan Speaker, thank you for allowing me to participate in the debate on the Motion of Appreciation to the Royal Address by Tuan Yang Terutama in this august House on 29th April 2019.

Tuan Speaker, I would like to begin by thanking the Tuan Yang Terutama Yang di-Pertua Negeri for the wise advice and encouragement that he gave during his opening address. We will continue to give full support to the Yang Amat Berhormat Chief Minister of Sarawak and work hand-in-hand to ensure the develop and prosperous State of Sarawak.

Tuan Speaker, I wish to highlight a few issues for the State Government to seriously consider and realize for the development of the State and well-beings of its people particularly to Sibu.

Merger of Under-Enrolled Schools

Firstly, Tuan Speaker, to date, record of Sarawak education department revealed that there are more than 600 schools with less than 150 students and more than 1,000 schools with less than 300 students in Sarawak. The optimal sizes of schools for them to be effective are 300 to 400 pupils for primary school and 600 to 1,000 for secondary schools. It stands to reason that schools with low enrolment will be at a distant disadvantage in marshalling the resources required to ensure not just quality education but even to perform at par.

So far, the academic performance of rural schools has not been better than the academic performance in urban schools. Rural schools which, unsurprisingly, are the worst off, lag well behind, particularly where the teaching of Science and Mathematics is concerned. Again, it is noted that the performances or achievements of STEM (Science, Technology, Engineering and Mathematics) programmes in the State among the secondary school is low.

Enrolment in the science stream further dropped and shockingly also less at tertiary level in Sarawak. There is great concern on how we can achieve the National target of 60% enrolment for STEM - major in universities when 70% - 80% of future jobs are expected to be engineering and science based.

Tuan Speaker, one solution is to merge the under-enrolled schools. No doubt, it is a worthy, right and commendable emphasis by our State Government and it cannot have come at a more opportune moment. In view of the benefits to the under-enrolled schools which are also under-resourced, we should support the State Government in pursuing the path of persuasion, to get consent of parents and students in this move. Small Chinese and missionary schools are encouraged to at least merge among themselves. Our concern is to provide our young Sarawakians with better school facilities, and for them to be taught by specialist teachers, so that we can improve the State’s overall academic performance.

While proactive intervention by the State authorities is timely, it also needs to be a strategic plan which seeks to supplement and complement Federal efforts. The bulk of funding for education purposes will still have to be sourced from the Federal budget and nobody will be served unless State and Federal efforts in this regard are well coordinated and hopefully properly synchronized.

It is important that both State and Federal education officials must work on the assumption that their efforts will all contribute to greater added value to public education in Sarawak.

Teaching Mathematics and Science in English in Primary Schools

Secondly, teaching Mathematics and Science in English in Primary Schools. It is encouraging to note that our Sarawak Government has agreed to be the first State to implement the teaching of Mathematics and Science in English for primary schools in the State soon. Certainly, this initiative is

expected to boost English proficiency of the students at the early stage of education as well as enhance student’s future employ ability opportunities.

Tuan Speaker, at the same time efforts are also taken to ensure that the importance of our National language is not neglected. English is a widely used international language. Allowing English to be medium of language for Mathematics and Science in primary school will help to nurture more Malaysians to be multilingual and they would not only good in Bahasa Malaysia but also in English and Mandarin.

In fact, ASEAN countries are also looking up to Malaysia in terms of its implementation boosting the English standards in both the schools and in the working world. Besides, mastering English since young will make it easy for secondary students to face the language challenge at the higher level. This is because the main language uses in universities and higher learning institutions is English. If students had built a strong foundation in English, it will make their study lives much easier in future.

Apart from this, English is the language of Science and Technology. To teach Mathematics and Science in English in Primary Schools will give more advantages to the students in the long run as more than 95% of science and scientific articles on the internet web pages are written in English. This good policy would further enhance Malaysian students’ competitiveness in this modern challenging era.

Additionally, the Malaysian Agreement of 1963 provided and allowed the use of English in the State Assembly, Courts, State Cabinets in Sabah and Sarawak. Although the English language implementation process will definitely be an uphill battle, but we hope that with the collaborated efforts for the both State and Federal Government, the implementation of the programme will be successful for the development of our human capital towards progress of our nation in future.

Quota System for the Matriculation Programme

Thirdly, Tuan Speaker, I would like to touch on quota system for Matriculation Programme. Matriculation Programme is popular as it is much cheaper than pursuing other pre-university courses at private institutions, apart from allowing greater chances of entering public universities.

Since year 2005, the selection process for the Malaysian Matriculation Programme is done through the race-based quota system, whereby 90% of the places are reserved for Bumiputera students while the remaining 10% are open for non Bumiputera.

Recently, the Cabinet decided to increase the student intake into this programme from 25,000 to 40,000 but maintaining the quota system which allocates 90% of seats for the Bumiputera and 10% for the non-Bumiputera. Even if matriculation colleges can fill the seats, the infrastructure of these colleges will not be able to support the 40,000. The move does not address the core problem of the issues – the 90:10 ratio. Many non-Bumiputera high achievers will still get side-lined. The government punts the problem into the future – but all sides are also presenting rather parochial and half-baked ideas.

In recent weeks, it is so heartbroken to see many non-Bumiputera students who excelled in the SPM examinations were denied entry into Matriculation programme. The current policy of racial quotas for matriculation intake is unjustifiable, unreasonable and unlawful. Indeed, the system is an unfair playing field and racially segregated. Understandably, this has caused great frustration, disappointment and cries among the diligent students. The whole experience had made them question their love for the country.

The entry should be strictly on merit. The system should nurture talent. It is entirely reasonable, and more than sufficient, to allocate opportunity by taking into accounts academic ability and

potential, not just ethnicity. But we are creating generations of people who think this country is unfair as the centres are paid by taxpayers.

In this regard, our country needs to streamline pre-university exams for all races to create true meritocracy. Otherwise, our talented students will leave and they do as they feel that the country does not appreciate them.

An unjust education system was partly the reason for Malaysia’s brain-drain problem. According to the World Bank, the ethnic Chinese make up the majority of the brain drain from Malaysia. Therefore, race based quota system does not help the development of our education system, which will instead lead to more talent exodus.

Today, with neo-liberal education and privatization, education has become so expensive and unaffordable. So now, there is a huge demand for matriculation because it is fully subsidized.

The current system based on racial quotas will continue to segregate our society and will continue to give race-based politicians from both sides of the divide an excuse to continue to politicize education. At the end of the day, our education system will continue to be tainted with accusations of discrimination and this will further divide the people.

Imagine if young people continue to be brought up based on a race-based quota education system. What kind of perception will they take home as leaders of our nation in the future.

Matriculation entry is an educational right. The main deficiency in the system is that it underequips their students academically. It does not cultivate academic rigour and confidence. The grievances of non-Bumiputeras on not getting access are valid.

Harapan must be brave enough to bring a new culture based on equality and justice. The government should end the current practice of prioritizing Bumiputera students in its pre-university, matriculation programme as this also goes against the Federal Constitution’s guarantee of no discrimination against citizens. Every student deserves their right to education without discrimination, regardless of their race. Therefore, the race-based quota system should be abolished.

Granting Citizenship to Stateless Sarawakian Children

Fourthly Tuan Speaker, statelessness is an issue that has plagued Malaysia for years, especially in the States of Sabah and Sarawak. Many applications to grant citizenship to stateless Sarawakian children had either been rejected or were not acted upon over the years. These stateless children who cannot work have developed social problems.

Understandably, no parents want their children to have non-citizen status. Sarawak has large number of foreign labourers in various industries. Circumstances have forced them to experience this tragic situation.

However, these stateless children lead normal lives with good behaviour. They are not criminals. But they cannot work or enjoy the benefits of citizen due to their stateless status.

As reported by UNHCR (United Nations High Commissioner for Refugees), statelessness can lead individuals to feel insecure and frightened to move around, especially when government officials are present. Solving this problem needs a humanitarian act to ensure no children are left behind.

It is unfortunate that even with access to education under a new Zero Reject Policy in 109, the reality is that without citizenship, these children are still limited in many areas like freedom of movement, employment opportunities, scholarships and so on.

We must direct our efforts towards relieving the plight of these stateless children. They are born in Sarawak. Sarawak is still underpopulated with vast areas and resources. We should accept them on humanitarian ground and fight for power in MA63 to grant them citizenship. This will also benefit the development of Sarawak in the long run. Many western countries have also given citizenship even to immigrants.

On this note, the approach of the Home Ministry towards the problem of stateless children was irresponsible and contrary to the Federal Constitution. It was not only against the law and Constitution, but also against the Pakatan Harapan’s manifesto, which recognized the problem of statelessness in Malaysia. Why is the Home Ministry bent on wrongly interpreting the Constitution to the prejudice and disadvantage of guiltless children and rendering them stateless? To adopt the course suggested by the Home Ministry would be to punish the innocent child simply for being illegitimate, which is unjust and inhuman.

Besides Tuan Speaker, it was common for the application under Article 15A to take several years to process and frequently resulting in repeated rejection while the stateless child remained in limbo. The PH government’s answer in Parliament that the children can apply under Article 15A was the standard response given by the past government. It is a transparent delaying tactic to deny citizenship to desperate stateless children.

Apart from this, the discriminatory laws which affect the lives of many Malaysians and their families are inconsistent with the spirit of the Federal Constitution, which guarantees equality and prohibits gender discrimination. In a democracy based on rule of law, all citizens must be treated as equal before the law and thus, be given equal right to confer nationality on their children and spouses, regardless of gender.

In addition, Malaysia’s discriminatory nationality law also conflicts with the UN Convention on the Elimination of All Forms of Discrimination Against Women (CEDAW) and the UN Convention on the Rights of the Child (CRC), both of which Malaysia has ratified. If Malaysia does not reform its nationality laws, it would be left behind, as more and more countries move to eliminate gender discrimination in their nationality laws.

Currently, Malaysia is one of only three countries in the world that deny men equal right in conferring nationality on children who are not born within a legally recognized marriage and one of the only 25 countries that deny women the right to confer nationality on their children on an equal basis with men. In this regard, we must leave no one behind and ensure that our nationality laws upheld gender equality, in line with the UN Sustainable Development Goals.

Additionally, maybe the United Nations would even push Malaysia to be party to the UN’s 1945 and 1961 Convention on Statelessness that have yet to be ratify. Nevertheless, we are a party to the UN’s Convention on the Rights of the Child 1990, which states in Article 7.1 that the child has a right to a nationality.

Sarawak Government had been doing its best by forming a special taskforce to help stateless children be recognized as Malaysian citizens. We should fight for Sarawak having its own authority to give citizenship to our stateless children. It is our hope that the Home Ministry would exercise good judgement in reaching a sensible decision, which would allow these individuals to live their lives like any other citizens. On all issues, Harapan political parties as a coalition should be on the same page on major issues but there seems to be no consensus...(interuption)...

Deputy Speaker

Member for Dudong can you conclude, we are running out of time.

Datuk Tiong Thai KingBEBAS · BNDudong

Ya, okay. Almost finish. Harapan is supposed to be a coalition of hope. We thought the new government will have a more progressive attitude. But so far, it is not giving much hope with its numerous U-turn and unkept promises. Tuan Speaker, before I conclude, I wish

to take this opportunity to congratulate and thank Datuk Amar Speaker for your wisdom in ensuring that the proceedings in this august House were conducted with dignity and proper decorum. Sekian, terima kasih.

Deputy Speaker

Ahli-ahli Yang Berhormat, today is Friday. We take an earlier break so the sitting is adjourned and the House shall resume its sitting at 2.30 p.m. this afternoon.

(Mesyuarat ditangguhkan pada jam 12.09 tengah hari)

(Mesyuarat dimulakan pada jam 2.48 petang)

(Timbalan Speaker mempengerusikan Mesyuarat)

Continuation of debate on the Motion of Thanks for the Speech of His Excellency the Yang di-Pertua Negeri of SarawakMotion

Deputy SpeakerEN

Honourable Members, under Standing Order 31(8), I hereby limit Members' speeches on Tuan Yang Terutama Yang di-Pertua Negeri's address to a maximum of 15 minutes.

Deputy SpeakerEN

Honourable Member for Meradong.

Datuk Ding Kuong HiingSUPP · GPSMeradong

Thank you, Tuan Speaker, for allowing me to take part in the debate, a motion of thanks to His Excellency Governor of Sarawak during His opening address to this DUN Sitting, among many other issues asked by His Excellency, one particular issue is that he is pleased with the government’s effort to negotiate the rights and privileges under MA63. He urged the government to do the negotiation through proper channel and this is what we are doing right now. Tuan Speaker, please allow me to go into a few local issues in my constituency.

On behalf of the people of Meradong District, I wish to thank the Right Honourable Chief Minister for approving the Upgrading of Water Supply Project in Meradong which is, at present, in the design stage. Once the project is completed it will solve the water problem for the district and its surrounding areas.

However, the project is going to take two years to complete and therefore, remedial actions must be taken to alleviate the acute shortage of water supply in the meantime. Here I would like to thank the Ministry of Utilities for setting up a 5 million litre per day water treatment plant to supplement the existing Temudak Treatment Plant which is producing about 12 million litre per day at the moment. This is a positive step taken by the Ministry to help us to overcome the serious water shortage.

Apart from that, I would like to list down some pressing issues faced by JBALB on the ground, which I hope the Ministry can look into seriously :-

(a) Lack of manpower in JBALB Meradong, especially the technical staff on the ground for identifying and locating the pipe bursts;

(b) Lack of transportation for the said technical staff; and

(c) There are more than 200 kilometer of existing AC or asbestos cement pipes or PVC pipes in Meradong District that are prone to bursting and this will only get worse when the upgrading works are completed which will obviously resulting in higher water pressure. Therefore, all these aging pipes need to be replaced during these two years in preparation for the commissioning of the newly upgraded water suppy system.

Proposed Improvement And Upgrading Of Bintangor Water Front

The people of Meradong vividly remember a proposed project to improve the Bintangor Water Front many years back but unfortunately was postponed due to technical problem. Bintangor has long been neglected partly due to it being represented by opposition ADUN for the previous two terms. Not much projects were given to this humble town, famous for her Limau Bintangor, Pamelo and Udang Galah.

Therefore, I would like to plead with the Right Honourable Chief Minister to allocate project for the Proposed Improvement and Upgrading of Bintangor Water Front as soon as possible so as to improve the outlook of Bintangor Town and also to create a much needed and suitable venue for many leisure activities for the local folks.

Teachers for Pendidikan Khas Classes

I wish to take this opportunity to inform the authority concerned on the shortage of trained teachers for Pendidikan Khas Classes at SMK Bandar Bintangor. While I am trying my best to assist in providing a better and more conducive environment for these special students by way of providing necessary infrastructure, it is very frustrating to note that we are lacking properly trained teachers to provide special education to these less fortunate children. There are 29 students in the school and if according to Education Ministry’s standard it should have four classrooms with each class having six to eight students and a total number of seven teachers. However, at the moment we only have five teachers and out of the five, only two are trained teachers. Although the other three are now undergoing Kursus Pendedahan Asas Pendidikan Khas.

Referendum Ordinance

A referendum is a form of direct democracy that will increase political participation of the voters in between general elections.

Recently, it has been the people’s voice on the ground calling for referendum on matters of paramount importance to Sarawak rights and interests, in particular on matters concerning MA63 and the amendments of Federal Constitution.

I, therefore, call upon all my fellow honourable members of this august House to seriously consider and study the viability of a referendum ordinance that will further uphold our democracy by honouring our people’s aspirations which this august House is tasked to do all the time. Let Sarawak be the first State in Malaysia to lead the way in referendum, a democratic way to let our people speak their minds and wishes as propagated by our party forefathers some 60 years ago.

Matriculation Intake 2019

On the recent announcement by the Education Minister to increase the intake of matriculation students from 25,000 to 40,000 with the quota remain at 90:10 and without increase in the intake of IPTAs and as SUPP Education Bureau Chief, I am very concerned with the dilemma faced by the STPM students.

The total estimated vacancies of IPTAs in our country is about 43,000 and if 40,000 of them are to be taken up by matriculation students then we are left with only 3,000 vacancies for about 50,000 STPM students to fight it out. This is most unfortunate and unacceptable and need to be addressed immediately.

To make matter worst, the Pakatan Harapan Sarawak leaders though being part of the Federal Government, chose to remain silent and failed to address this most unfair treatment to STPM

students. And the same can be said to the many empty promises by Pakatan Harapan Sarawak. I’ll confine to Sarawak only.

Empty Promises by Pakatan Harapan Sarawak

Tuan Speaker, Pakatan Harapan has made many promises during GE-14 but chose to ignore and refuse to admit and apologise to the people when they could not fulfil them. It has been almost a year and I would like to quickly remind or refresh their mind on those promises as follows:-

(A) 7 Guaranties for Sarawak Within 1 Year by Pakatan Harapan Sarawak

1) 20% Petroleum royalties and 10% of the revenue will be declared petro cash dividents for Sarawakians. 2) RM1 billion for the repair and upgrading of dilapidated rural schools and provision of facilities and increased staffing. 3) A stable price support system for farmers in raw rubber and raw pepper. 4) Subsidised public bus services in all major towns. 5) Expedite process of identity card registration and birth certificate applications. 6) All religions in Sarawak will have equitable access to development in line with Article 3 and Article 11 of the Federal Constitution. All religions shall enjoy equitable distribution of building funds and lands. 7) (a) Solar, micro-hydro and biogas power options for rural communities still without access to electricity. (b) Shall not support the provision of Federal Government loans or grants for the construction of any mega hydro-electricity dams.

(B) And they of course, there have this The Bintulu Declaration which I’m not going to repeat because our Honourable Member for Nangka already spelled out very clearly two days ago.

So it is very clear that Pakatan Harapan cannot deliver and the saying goes to err is human but unfortunately our Honourable Members from the other side just can’t be man enough to admit that they can’t deliver and apologize to the people.

With the above observation, I beg to support the motion of thanks to his excellency the Governor’s opening address for the 1st Meeting of the Fourth Session of the Eighteenth Dewan Undangan Negeri Sarawak.

And before I sit down, I would like to take this opportunity to wish our Dayak Friends Selamat Hari Gawai and to our Muslim friends, Selamat Hari Gawai.. thank you Tuan Speaker, ah.. sorry… Selamat Hari Raya. Selamat berpuasa. Thank you, Tuan Speaker.

Deputy SpeakerEN

Honourable Member for Tanjung Datu.

Bismillahirahmanirahim. Assalamualaikum warahmatullahiwabarakatuh. Salam sejahtera,

Tuan Speaker, first and foremost I convey my greatest appreciation to YB Datuk Tuan Speaker for giving me this opportunity to participate in the debate to support the motion of thanks to the address by the Tuan Yang Terutama Tun Pehin Sri Haji Abdul Taib Mahmud Yang di-Pertua Negeri Sarawak delivered on Monday, April 29th, 2019.

In the address, the Yang di-Pertua Negeri touched on matters of great importance to our beloved State, on matters affecting the life of Sarawakians, the rakyat, especially on policies of the Government of day, the GPS Government, to improve the socio-economic well-being of the rakyat.

This prompts me to convey the appreciation and gratitude from the rakyat in my constituency to the Sarawak Government and especially to Yang Amat Berhormat Chief Minister, Datuk Patinggi (Dr.) Abang Haji Abdul Rahman Zohari Bin Tun Datuk Abang Haji Openg, for approving a large number of people centric projects to a tune of RM346 million for a period for the year 2018 to the year 2020. This amount consists of the projects such as Rambungan Bridge (RM124 million), a new eight bridges (RM100 million), Sematan floating pontoon (RM5 million), CENTEXS (RM129 million), water treatment and supply (RM44.8 million), hawker centre (RM4.0 million), Lundu and Sematan Waterfront (RM11.2 million), landscape, MRP and RTP’s.

In this three year development, my constituency will benefit greatly from those projects. However, let me say it here that it takes some time for the agencies to implement those projects as these agencies are required to adhere to the procedures and good governance.

Oleh yang demikian, saya menyeru penduduk di kawasan saya untuk bersabar dan saya akan pastikan semua projek ini akan dilaksanakan mengikut jadual dengan jayanya.

Jajaran Lebuhraya Pan Borneo

We give credit where credit is due. This is for the case of the Pan Borneo Highway, the Sematan to Telok Melano stretch. Construction commenced in 2016, and it was completed in 2018.

The first stretch of the 33km Pan Borneo Highway was officiated by Yang Amat Berhormat Chief Minister on the 26th January 2019. Thank you Yang Amat Berhormat CM.

Cadangan Projek Pembesaran Kampung

Tuan Speaker and Honourable Members, masih lagi berkaitan dengan Pan Borneo Highway. Jajaran atau alignment lebuhraya tersebut dari Lundu ke Kuching sebelum Jambatan Batang Kayan telah menjejaskan jalan masuk ke Kampung Stunggang Baru. Oleh itu, saya memohon agar Kerajaan meluluskan peruntukan untuk membina jalan baharu sebagai jalan alternatif. Jajaran jalan baharu ini akan menjadi jalan utama kepada projek Skim Pembesaran Kampung Stunggang Baru (SPK) yang mana tapak untuk projek ini sudah diluluskan.

Dalam pada itu, belum ada sebarang kemajuan tentang projek tersebut setakat ini. Sehubungan dengan itu, saya memohon agar Kerajaan dapat sekaligus meluluskan peruntukan untuk kerja-kerja tapak termasuk menimbus serta penyediaan infrastruktur asas untuk pembesaran kampung tersebut.

Setelah itu, saya mencadangkan agar skim perumahan mampu milik rakyat untuk memberi kemudahan dan manfaat kepada mereka yang terlibat dalam projek pembesaran kampung tersebut.

Seterusnya saya ingin mengetengahkan isu berkenaan dengan rancangan Projek Pemajuan Kawasan (PPK) oleh Kerajaan Persekutuan yang mana tapak PPK bertempat di Matang Terap, Lundu ini sudah diluluskan oleh Kerajaan Negeri. PPK tersebut bernilai RM30 juta dan merangkumi komponen pembinaan 100 unit rumah, dewan masyarakat, tabika, surau serta infrastruktur asas.

Rumah-rumah ini disediakan kepada penduduk-penduduk di mana kediaman mereka diancam oleh hakisan tebingan sungai Batang Kayan. Tetapi, sehingga kini, projek tersebut belum bermula dan oleh itu saya memohon agar pihak berkenaan, khasnya Kementerian yang berkaitan dapat menyegerakan pelaksanaan projek ini dalam masa yang terdekat.

Pembangunan Usahawan Tempatan

Tuan Speaker dan Ahli-Ahli Yang Berhormat, saya amat menyokong usaha Kerajaan menyediakan pelbagai latihan kemahiran dan program peningkatan pendapatan, termasuklah projek keusahawanan dan industri kecil-kecilan. Di samping itu, Kerajaan juga giat menyediakan kemudahan tempat untuk para usahawan dan peniaga-peniaga.

Oleh itu, saya berterima kasih atas kelulusan projek pembinaan Anjung Usahawan di Sematan dengan nilai projek sebanyak RM4 juta dan saya telah terlibat bersama agensi pelaksana dari mula pada peringkat perancangan sehingga ke reka bentuk. Kita juga melibatkan semua pihak, terutama sekali para usahawan dan peniaga-peniaga yang akan menjadi ‘stakeholder’ kepada Anjung Usahawan tersebut nanti.

Dalam pada itu, saya juga ingin mencadangkan kepada Kerajaan untuk mempertimbangkan sebuah lagi Anjung Usahawan untuk ditempatkan di Kampung Telok Melano. Saya mendapati kawasan baharu ini mempunyai potensi yang besar untuk dibangunkan. Pada masa ini belum terdapat apa-apa kemudahan yang sesuai terdapat di kawasan tersebut.

Saya bercadang agar Anjung Usahawan tersebut nanti menjadi sebuah pusat kemudahan bersepadu, lengkap dengan prasarana untuk kemudahan berniaga dan sebagai penyumbang kepada ekonomi pelancongan Negeri Sarawak.

Ketenteraman dan Keselamatan Sempadan

I have touched on matters of security especially along the Sarawak-Kalimantan border of my constituency during the last three sittings. However, I am dismayed that not much has happened since I first brought up the matter in this Dewan. Now with the completion of the Sematan-Telok Melano highway, opportunity is very much ample and a plenty for border intrusion by our neighbour, both by land and by sea through Tanjong Datu National Park.

Therefore, I urge the relevant authority, Majlis Keselamatan Negeri to bring this matter up to the Federal counterpart to have this border security matter addressed forthwith.

Pembangunan Modal Insan

At every sitting of this Dewan, I never fail to speak on education, a subject very close to our heart. In the development of CENTEXS, I would like to express my sincere appreciation for this project. In the other hand, I would like to ask on the planning for the development of matriculation centre planned to be built in Sematan previously. I urge the Ministry and agency concerned to give information on the status of this project.

The recent allocation of a meagre RM100 million against the RM1.0 billion agreed by the previous Federal Government, on top of the annual allocation already approved, could only cover 32 schools out of 1,020 dilapidated schools specifically under my consistency we have 7 dilapidated schools are affected. These include SK Telok Melano, SK Pueh, SK Pugu, SK Rambungan, SK Stunggang Melayu, SK Stunggang Temelan and SK Sebat. I hope all of these schools to be giving priority consistent with my balance strategic plan proposal.

In relation, this is a bold step for the Government to adhere the opportunity for our children further their study in the state. At the same time to improve education system nationwide.

Alam Sekitar Yang Mampan

Tuan Speaker, sebagaimana yang semua sedia maklum, kawasan saya dianugerahkan dengan keindahan alam sekitar seperti pantai-pantai yang indah seperti di Rambungan, Sampadi,

Pandan, Pugu, Abang Amin Sematan dan Telok Serabang serta Telok Melano. Kawasan saya juga dipagari dengan Taman Negara Tanjung Datu, Gunung Gading, Gunung Pueh dan Pusat Hidupan Liar Samunsam. Apa gunanya anugerah indah ini jika saya serta rakyat Tg. Datu khasnya dan pengunjung-pengunjung dari serata Sarawak amnya jiwa mereka tidak peka untuk memelihara khazanah alam ini baik dari segi pemuliharaan mahupun pemeliharaan kebersihan.

Saya begitu mengambil berat akan perkara ini kerana pemeliharaan alam sekitar, kebersihan dan mengekalkan kehijauan alam untuk dilihat oleh generasi yang akan datang kelak. Dengan sikap cakna akan keindahan alam sekitar inilah saya sekali lagi menyeru agar pihak Kementerian Pelancongan dapat mengambil langkah atau pendekatan jangka pendek dengan menyediakan kemudahan prasarana, melaksanakan program kesedaran alam sekitar dan pembangunan modal insan yang selari dengan Pelan Induk Persisir Pantai Lundu-Sematan 2015.

Another matter that I would like to bring to the attention of this House is the lack of enthusiasm of our people towards preserving the environment. Keeping our surrounding clean and tidy is problematic.

In this august House I welcome all the visitors to our new attractive tourism areas of Telok Melano and Telok Serabang. Thanks to the government on the completion of the Pan Borneo Highway to this area. However, I am appalled and disgusted of the visitor’s attitude of not taking care of the cleanliness and environment. The picturesque scenery of the villages is spoilt by the unsightly presence of rubbish.

No matter how much effort the local authority puts in keeping the area clean, without the cooperation and understanding of everyone of us, their effort will be rendered futile. I urge our fellow Sarawakians, please help us preserve the beauty and the tranquillity of these areas by “take nothing except picture and leave nothing except foot prints”.

The matter of solid waste management brings me to another issue. The local council has been directed to close the existing dumpsite in Kampung Stunggang, Lundu. Therefore, there is no objection on the directive as the dumpsite has caused nuisance to the locals. However, how could the Council comply with the directive when the planned budget for the new landfill which was approved in the 11th Malaysia Plan with the new site identified in Stungkor, half way between Lundu and Bau is not enough? The new landfill was to cater for both councils, Lundu and Bau District Councils.

We don’t want this project to be delayed further, therefore we would appreciate it very much if the authorities concerned start the ball rolling to address this issue before we face the stinky environment later.

Tuan Speaker, I will not touch anymore on MA63 as I have spoken at length on this matter on the support of the Motion to amend the Federal Constitution last Tuesday. I pray that the Federal Government in good spirit would heed and accede to our stand on the matter.

I wish to reiterate that the State Government is people-centric and we as the Wakil Rakyat must work hand in glove with the civil servants to ensure that all the policies are duly translated and executed to the benefit of the rakyat.

In closing, I must thank again, Tuan Speaker for giving me the opportunity to debate the Motion of thanks to the address by the Yang di-Pertua Negeri Sarawak.

I wish all my Muslim friends ‘Selamat Menyambut Bulan Ramadhan Al-Mubarak’ dan seterusnya Selamat Hari Raya and to my Dayak friends, ‘Selamat Ari Gawai, Gayu Guru Gerai Nyamai’. I beg to support. Sekian, terima kasih.

Deputy SpeakerEN

Perfect timing. Honourable Member for Ngemah.

Tuan Speaker, thank you for giving me the opportunity to participate in the debate on the Motion of appreciation to the royal address by Tuan Yang Terutama Yang di-Pertua Negeri Sarawak in this august House on 29th April 2019.

First, I would like to congratulate Tuan Yang Terutama Yang di-Pertua Negeri Sarawak for giving a comprehensive address on various important subject pertaining to issues, ideas, agenda and policies needed for the continuous development of the State.

Despite the defeat of the then Barisan Nasional at the national level in the last 14th General Election in 2018 that is last year, the State Government of Sarawak under the leadership of Yang Amat Berhormat Chief Minister, Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari Bin Tun Datuk Abang Haji Openg, continue to govern the State efficiently and effectively. By the formation of Parti Gabungan Sarawak (GPS), which was launched on the 9th of January this year, the State Government put Sarawak into a higher level and position to meet the aspiration of the people of Sarawak. Within less than half a year, GPS has grown to the full capacity and gain increasing support from the people of Sarawak. I believe, the State will continue to experience rapid growth in terms of physical and economic development under the GPS Government in years ahead. The GPS government through its slogan “Sarawak First” shows that the State Government is very committed in taking care of the well-being of the people in the State irrespective of their races, culture, religion and political differences.

Tuan Speaker, the move by the State Government to secure and pass a comprehensive amendment of various Articles in the Federal Constitution (Amendment) Bill, 2019 shows that the Sarawak Government or GPS Government is very serious in wanting to restore the Status of Sarawak under MA63, as well as to safeguard the legislative and executive power of the State which was eroded and diluted by the Federal Government since the formation of Malaysia.

The ministerial Motion moved by the Assistant Minister, Yang Berhormat for Samariang which was passed unanimously in this DUN sitting definitely sends a very strong message to the Federal Government that the State is not happy with how it should be treated as equal partner since.

I believe the people of Sarawak will agree and support what the State Government is doing and I do hope that the State Government would continue to find an appropriate way to negotiate and eventually return back the pertinent powers to the State. As Sarawakian, we believe that whatever is legally ours, belong to us should be given back to us.

On the other note, I wish to compliment the State Government under the leadership of YAB Chief Minister of Sarawak for successfully implementing the 65 development initiatives in the State Agenda since he took office on the 13th of January 2017. The people of Sarawak should realize by now that the GPS Government is the most capable government who “Walk The Talk” in running the State unlike the PH Government who can only make thousands of promises to the people particularly in their last election manifesto, but in the end we don’t see much changes or light at the end of the tunnel.

I am happy to note that the State Government continues to have an excellent and clean record of good credit rating in terms of financial management by the International Credit Agency. “Syabas” to GPS government. This will encourage more private investor from the outside to come to Sarawak and at the same time will boost up the economy for the State.

The continuous effort of the State Government to develop the rural areas of Sarawak should be applauded and welcome by the rural people of Sarawak. There must be a balance of socio-economic, infrastructure and other facilities between the urban and rural areas to achieve the target of develop state by the year 2030. The formation of various agencies such as Upper Rajang

Development Agency (URDA), Highland Development Agency, Northern Region Development Agency and Integrated Regional Kota Samarahan Development Agency will boost up the socio-economic development in the rural areas concern. This will at the same time assist the government to develop and manage the local area efficiently and effectively.

On behalf of the people in my constituency, I would like to thank the State Government for allocating RM100 million this year through URDA for the initial construction of long awaited 22 km Ng. Ngungun to Ng. Jagau Road. I wish to inform this Dewan that the amount is insufficient to complete the road with R2 standard. Therefore, it is sought that the Government will allocate more fund based on the consultation report which will be done very soon to complete the job.

Tuan Speaker, it is interesting to note that the State Government continue to focus on the use of Digital Economy for various purposes such as tourism, industry, agriculture and smart city in the State. With the construction of Sarawak Digital Village at Sama Jaya, the people of Sarawak especially the young generation will have the chance to participate in the programme provided. This will at the same time facilitate and provide a transformative pathway to support innovation amongst the young generation. In line with this, I suggest that more Digital Innovation Hub to be established throughout the State at the divisional or district level.

The construction of more telecommunication towers and improvement of the existing towers should be carried out throughout the State to improve the telecommunication service particularly in the rural areas. I wish to request from the State Government to construct more telecommunication towers in my constituency, as there are still very poor reception of internet and telecommunication in some parts of my constituency.

Tuan Speaker, I would like on behalf of the communities living in the three Rejang Security Command area in my kawasan is under RASCOM resettlement area in my constituency namely, Ng. Tada, Ng. Ngungun, Ng. Jagau, RASCOM Resettlement area to put up some urgent request to the State Government. The three RASCOM Resettlement Area consists of 65 longhouses, approximately 1000 door with a population of approximately 4000 people.

Historically, during the time of communist insurgency in the year 1972, these people mostly living in the very remote area of Ulu Sg. Tada and Ulu Sg. Ngemah were asked to move and resettled in the three resettlements under the Operation Bebatak by the RASCOM. They have to sacrifice everything including their ancestorial land for which they live and earn their living on to prevent them from being associated with the communist at that time by the Government. They were promised by the Government at that time to be given five acres of land per door for farming that is for planting padi, rubber, cash crop, pepper etc. and rearing of livestock. However, this matter remain unattended until today because of the lack of land area nearby compared to their original place where they used to do the farming to earn their living.

Despite this hardship, they still remain loyal to the Government and the State as a whole. I therefore wish and urge the State Government to provide piece of land nearby the Resettlement Area concerned to ease their burden at the same time for them to continue with their farming activities.

Tuan Speaker, I wish to compliment the State Government Land policy to continuously allocate substantial amount of funds to carry out the perimeter survey work of NCR land in the state. I like to address my sincere appreciation and thanks to the State Government for carrying out the perimeter survey of approximately 20,000 hectar of NCR land and gave away a gazette notification certificate under Section 6 of Land Code to 72 recipients in Ngemah Constituency recently that is on 15th April 2019.

In addition to that, a total of around 65,347 hectares of NCR land were given a title under Section 18 to 33 recipients in Kanowit District. This shows that the State Government is very serious

in giving out the land title to the individual with the rightful owner in contradictory to the allegation made by the opposition to rob the NCR land from the people of Sarawak.

Last Tuan Speaker, but not least, I wish to end my speech by wishing my Muslim friends, Selamat Berpuasa dan seterusnya Selamat menyambut Hari Raya Aidilfitri and to all my Dayak friends, Selamat Hari Gawai, Gayu Guru Gerai Nyamai, Lantang Senang Nguan Menua, and with the slogan “Sarawak First” I beg to support the motion of appreciation to the royal address by Tuan Yang Terutama Yang di-Pertua Negeri Sarawak. Thank you.

Deputy SpeakerEN

Honourable Member for Tanjong Batu.

Encik Chiew Chiu SingDAP · PHTanjong Batu

Tuan Speaker, thank you very much for giving this opportunity to participate in this debate on the address by the Tuan Yang Terutama which was so graciously delivered in this august House on the 29th April 2019.

Tuan Speaker, six days short of a year ago, when Pakatan Harapan (PH) took over the government in Malaysia. That was the first time in the history of Malaysia that we have a change in government. Our country was deeply in debt then and still is, real debt and liability as at June 2018 was RM1,065 billion. Corruption was ugly, very seriously ugly indeed and many are afraid that if we do not do something quickly, the debt and corruption will bankrupt our nation.

Today, near one year later, we are in a better and more stable financial position then we were before, but the devastation is still there. There is always not enough money in the pockets for many, businesses are weak, each day you walk down five foot way, it is so quiet, and there is hardly any crowd. Life has become even harder for those who live in the poverty line.

All these, Tuan Speaker, are not something new, as there are in fact the reason that is, debt and corruptions that Pakatan Harapan won the election. The people had wanted change. But the problems which had been accumulating for 61 years, surely cannot be solved in one year. Pakatan Harapan government is now only asking for three years to bring back our economy to its positive track and that is by the end of 2021 and then to use ten more years from there on and move the country towards a high income economy country.

We faced big and difficult times in our country and the peoples expect us from both sides of the aile, to work through our differences, and not in confrontation, to overcome the nation’s problem. For though the people who sent us here are from different racial, religious, economic backgrounds and walks of life but they all have the same aspirations that they want to have work, they want to have good business and they can live better and to leave behind a better future for our children.

It would be easy for Pakatan Harapan government to do what is popular to borrow money and more money and give it to our people, spending recklessly as if there is no tomorrow. But the people have chosen us NOT because they just wanted these short term gain just to keep them happy, what they want is something that is real and necessary for themselves and for their next generations. The people wanted leadership. The new government now had taken steps to stabilize the financial system and she had also taken steps to get our economy growing again.

We do not want to bring the deficit problems into another generation. We must take meaningful steps to bring down our debts, which could damage our markets, increase the cost of borrowing and jeopardize our recovery. All of which would have an even worse effect, on our job growth and family income.

We therefore can rest assured, that our country today will become better because of the existence of our vigorous of the Pakatan Harapan, vigorous problem solving measures.

Of course, we should had never forget our outstanding civil force, the price they paid and the sacrifices that they made. For we know when the new government and the excellent civil force get into gear and rolling, it can only snowball to greater efficiency a success making the system better and better.

But the people are very frustrated to read news, to see the fights that we are engaged in, as if every day is an election day. We cannot be in fighting forever, only to read the news or posting on Facebook, as to who is being embarrassed more, the belief that if you lose, I win. There is no need for that. We may even go so far as to say something about the other side, no matter how false, no matter how malicious, thinking that it is just a part of the game. That exactly is the thing that has stopped either party from helping our people. Worse still, it is sowing further division in us and further distrust in the Government.

Pakatan Harapan had campaigned on change and today many of us are not sure if they still belief that we can change. But remember that we never suggested that change would be easy and that we could do it all alone. Our country is a very diverse country and we have been divided for so long racially, religiously, economically and regionally, and any time when you try to do big things and make big changes, you are bound to hit some nerves that could arouse great emotions and controversy.

So remember, we are here today, only because history had call for us to be here, because there is, this generation of people who are not afraid to do what was difficult to do, but to do what was needed, to do what it takes to keep the Malaysian dream alive and continue on with our reforms …interruption

Deputy Speaker

Honourable Member for Tanjong Batu, are you?

Encik Chiew Chiu SingDAP · PHTanjong Batu

No… No… No… on with our reforms, that the new Malaysia’s Pakatan Harapan clean governance allows our people to continue, to believe in the things that they should believe in, so that our children and our grandchildren could be better off.

Tuan Speaker, and there are few several issues in my constituency that I wish to bring out and I believe if they could be done, it would be good for the people there.

You know, Tuan Speaker, each time on arrival at the Bintulu airport from outside of Sarawak, lucky if you have the aero bridge to use as you would be getting out of the plane at level one. You then would go straight to the immigration clearance which is situated on the first floor as well, you check through that and then you go down stairs either on an escalator or an elevator then to your baggage collection on the ground floor and then out.

But if you are not so lucky and have no aerobridge to use and get out of the plane by the plane mobile ladder on to the tarmac, you will then have to walk a distance on the tarmac and then go up the staircase to the first level for immigration clearance.

Now that going up that staircase is most difficult for the elderly and those who have difficulty walking or mothers with children or just carrying your hand luggage up the stairs. I have seen it so often and I empathise with those people.

Could we not move the immigration clearance point at level one to down stairs so that those arriving on the tarmac would not have to climb the stairs for immigration clearance and those arriving at level one via the aerobridge can also use the escalator to go down plus if you are boarding the plane by the air plane mobile ladder you could also use the escalator or lift or the staircase, at least you can have a choice, use to be you can only use the staircase.

I urge the Administration to look into this matter seriously as it is really high time that this problem be solved. The older folks, the sick, the women and children had been suffering too long already because of this.

Tuan Speaker, Mr. Micheal Ngu of Lot 2407, No. 629B Taman Good Park at the Tanjong Batu Road could not have stolen SESCO electricity, yet he was slabbed with a arrears bill of RM6,374.70. I have known him personally and he is man of honor, an honest straight man who abide by the rule of law, he wants to be a good citizen. All the 27 years that he is living there, second row to the seashore of the South China Sea at the above address, he has never, ever even touched the SESCO meter installed outside his living room wall. Yet when SESCO changed his meter sometimes in the middle of 2016 he was said to have tempered the meter and the seals had broken. Tuan Speaker, how could any bare 1 (mm), millimetre lead, exposed to the air from the open sea for 27 years not be worn out or broken? What more to say that of the SESCO meter seal?

Mr. Ngu has complained to the Engineer of the Bintulu SESCO office and they had discounted him RM2,258.90. SESCO then demanded that he paid the rest of the bill or else his electricity will be cut off.

Tuan Speaker, you know how you would feel, when all the while you try to be a good and law abiding citizen and yet someone say that you are dishonest and that you pay what I say you pay and if you don’t I will punish you, cut off your electricity supply. You feel so angry, you feel like vomiting blood.

I hope that SESCO can be more understanding, look around, understand the people and the environment cannot be too rigid with the formula. Formula can be fallible too. Be reasonable and I urge that SESCO cancel the above said arrears.

Tuan Speaker, during the last DUN meeting I brought an issue of the people of Bintulu going to the Old Bintulu town from Tanjong Batu and Jalan Tun Ahmad Zaidi. The people had wanted a road that goes directly fromthe traffic light there to Jalan Abang Galau at Marco Polo. It is only about 150 meters long.

I have talked about the reasons of the need to build the road. But regretfully the Bintulu Development Authority (BDA) had not done anything about it and the people are getting very unhappy and frustrated.

All over Bintulu Town people are signing the petition to the Chief Minister to appeal to him to build and open up the road. I can say almost ten out of ten when approached person to person to sign the petition, they are very enthusiastic about it and would signit with their names and IC numbers. Whether it is the Chinese, Iban, Malay, Orang Ulu or anybody. Male, female, young or old or whether they are in the shops or in the offices or at tamu or in the coffee shops, all of them, anywhere.

Today with me here is the names of 6295 people who hadsigned the petition. Here it is, 6295 signatures. Tuan Speaker, the message is very clear that the people in Bintulu want the road to be build. They need it. and I hope BDA will listen to the voices of the people, respect their wishes and see their needs and build the road without any further delay. After all we are here to serve the people to help them live happily. If that is what the people want, we do it for them as from the petition so signed, the decision that it must be built is overwhelming.

Tuan Speaker, people living at Taman Nyabau Height, Jalan Tun Hussein Onn, Bintulu suffered great losses when the houses they bought were flooded in the middle of February this year and last few years also. Water went into their living rooms up to one foot high and damaged their sofa, carpets, TV and other electrical ware in the Kitchen. Now they are afraid when every time it rains whether it might flood again and even though it is midnight they have to get up and move their

belongings including moving their cars to higher grounds. In fact, last week it was flooded again. The water went in straight their house.

It is not right that they are made to suffer like this. Houses like this are not suitable for living. How could the authority that gives out the occupation permit, allow people to stay in houses that would be flooded and them suffer? Tragedy could happen. We should protect our people and not let them live in houses like that.

I urge that the administration to be most cautious about flooding in Bintulu, help the Bintulu people.

Like at the Medan Jaya Farley Medan Court why did it get flooded again now that aTidal Control gate had been built, completed 4 months ago, at Jalan Tun Razak. That is at the Tanjong Batu commercial centre. Flooded again, Tidal Control Gate. I urge that the Minister to look into this and enlighten the august House on this issue.

Tuan Speaker,19 house owners out of 61 at Hung Hung Garden at Jalan Sibiew Bintulu had not got their occupation permits (OP), the houses, infrastructure had all been done for all the units. I understand that this is a case that there is a dispute on the land boundary where the developer that build the houses had built several inches over to the neighbouring land at the lower half of the developed land lot, causing one of the neighbouring land owners refusing to sign consent.

Living in houses and not be given OP, not because of safety issues, is not right. How could we punish the house buyers and denied them of OP, when the issue here is land boundary, not building safety. It is an issue between the developer and the neighbouring land owner, we should not punish the house owners and let them suffer for something they have not done or know. In fact the certificate of practical completion CPC had already been issued by BDA. The house owners has put their whole saving into buying these house of his life time and now he has no OP and had been waiting for it for years.

I therefore urge that the OP be given to the house owners and they should not be victimized. The land issue can be settled between the developer and the neighbouring land owner.

Tuan, Speaker, hundreds of students from Taman Jade Garden walk to the nearby SMK Bandar morning, afternoon and in the evening Monday to Friday, using the drain crossing between House number, 131 and 41, Jade Garden. This route is a short cut and shorten the other route going by the road side to the school, by couple of hundred meters. But unfortunately, the crossing nowis removed giving way to the drain widening works.

Could the Authority make a new crossing there, please? It is important and most useful to the students as any shorter route is always a great relief walking under the hot sun these days.

Tuan Speaker, just a little bit more, the Bintulu fisherman dreads the mouth of the Kemena River as they go in and out of the sea each time to find their catch. This is because the river mouth is getting shallower and shallower.

Mishaps had already happened and again to the fishing boats there and the river mouth must be cleared, considering the amount of siltation its carries from the development up stream pipe the Kemena river.

I therefore urge that the relevant authority could take immediate steps to dredge this river mouth of the Kemena River before another mishap happens and with that thank you very much Tuan Speaker.

Deputy SpeakerEN

The Honourable Member for Kabong.

Honourable Encik Mohd. Chee Bin Kadir: Mr Speaker, thank you for the opportunity to take part in the debate on the motion of thanks for the speech of His Excellency the Yang di-Pertua Negeri of Sarawak.

First, I would like to record my appreciation to His Excellency the Yang di-Pertua Negeri of Sarawak, who delivered a speech touching on many matters that demonstrate his concern for Sarawak and its people. Among the essence of his speech, he called on all people, regardless of political affiliation, to support the Chief Minister in the negotiations to restore Sarawak's rights under the Malaysia Agreement 1963 (Perjanjian Malaysia 1963).

In response to that call, four days ago the people of Sarawak, through the State Assembly Members they elected, unanimously passed a Ministerial Motion calling for the Federal Constitution to be amended to give Sarawak equal status with Malaya and to restore Sarawak's eroded rights. The rights of Sarawak under MA63 should also be recognised. I hope the Sarawak Government will take action to determine the status of the Petroleum Development Act 1974 and the Continental Shelf Act as soon as possible, because both of these Acts have eroded or nullified our rights over the natural resources that we own and have allowed others to take them.

Mr Speaker, allow me to touch on matters relating to the people and the area that I represent and love, namely N.40 Kabong.

Water Supply

We are very grateful for the concern of the Chief Minister, who has allocated RM87 million to address the water supply problem in the Kabong area. This announcement was made during the Sejiwa Senada programme in Saratok on 22 April 2018. More than a year has passed, yet the people have not seen the start of the work to lay pipes from the water storage tank at Simpang Roban to the Kabong town. It is hoped that the Rural Water Supply Department (JBALB) will work hard to complete the water supply projects to Kabong town and implement them as quickly as possible.

The water supply situation in Kabong town has been very unsatisfactory for several years. JBALB needs to expedite (fast track) this project by using more contractors to complete it in the shortest possible time. Therefore, the sooner the project is completed, the sooner the residents of Kabong town will be able to breathe a sigh of relief.

For the past few years, the water supply in Kabong has become increasingly critical, especially during festive seasons. Therefore, the people of Kabong request that JBALB make early plans to overcome the problem of no water supply during those seasons by providing lorry deliveries under a more efficient system, and I ask that JBALB give attention to Kampung Gerigat, which also frequently experiences water shortages.

Apart from that, I once again plead and request that the Ministry of Utilities give attention to the application to install pipes in several longhouses in Ulu Roban, such as Rumah Belayong, Rumah Chaong, Rumah Empaling and Rumah Entengan. I ask my fellow comrade, the State Assembly Member for N.39 Krian who is also the Member of Parliament for Saratok, to apply for allocations from the Ministry of Rural Development to implement that project.

Electricity Supply

We are very grateful for the improvements carried out by SESCO, which built an additional line from Roban to Kabong that was completed a few months ago. The frequency of blackouts has now decreased. However, the people in the Kabong area are still waiting for SESCO to connect electricity supply to their houses. The District Office has sent applications to the relevant departments, but until now the residents, who number nearly 1,000, are still waiting.

Telecommunications Connectivity

In this digital era, it cannot be denied that strong telecommunications signals that enable fast and efficient internet use are among the prerequisites needed to boost the digital economy that we want to achieve. But unfortunately, these facilities are very unsatisfactory. The Kabong District Office has sent the locations where telecommunication towers need to be built to improve internet connectivity in the Kabong area. For example, residents of Kampung Nyabor have difficulty communicating or contacting outsiders because there is no good coverage.

Education

The only secondary school in the Kabong State Constituency area, SMK Kabong, has still been operating on two sessions for more than 20 years. At the end of 2018, I helped by using MRP to renovate several buildings to be turned into classrooms. I also helped purchase equipment such as chairs and tables. I am very surprised why the process of granting approval for single-session operation has taken such a long time. At present, SMK Kabong has not yet operated on a single session like other schools. Likewise with the new construction of SK Abang Leman, which was approved a long time ago but has still not been built to this day. This delay is very disappointing to the people of Kabong, and they request that the government show concern by building a new school as quickly as possible.

I would like to take this opportunity to thank PESW, BPSB, JV Sendirian Berhad, which will build a classroom block, a hostel block and a teacher's house as their CSR contribution to SK Engkabang. The groundbreaking ceremony was held on 25 April 2019.

Sports Facilities

It cannot be denied that sports activities, apart from contributing to physical health, can also prevent young people from being caught up in unhealthy social problems. Therefore, we request that the Ministry of Youth and Sports help build a futsal court in Kampung Gerigat, Empelam, and a court along Jalan Sungai Pasir, Selalang, for use by youths from the longhouses in that area. A sepak takraw field is also needed in Kampung Nyabor.

Ferry to Connect Kabong Town with Kampung Paloh

The Deputy Minister, Jalan Pesisir, during his visit to Kabong a few months ago received a request from the people of Kabong for a ferry service to connect Kabong town with Kampung Paloh at the mouth of the Krian River. They hope that their dream will become a reality and that there is positive progress on their request.

Kampung Expansion Scheme, Kampung Hulu Kabong

When the announcement was made that approval for the SPK Kampung Hulu had been obtained, the people of Kabong received it with great joy because at last they would have the opportunity to build houses on lots that will be distributed to those who are eligible. The people of Kabong town who are eligible hope they will get the opportunity to build houses in a new area equipped with infrastructure, and at the same time be able to live in a more conducive environment.

Kabong Community Hall

The existing Community Hall in Kabong is in a dilapidated and run-down condition. The people of Kabong want a new community hall to replace the existing one. To build the new community hall, an allocation of RM2.5 million is needed to add to the RM1 million that was approved by the late Tok Nan in 2016. The people of Kabong request the goodwill of the Honourable Chief Minister to provide a special allocation of RM2.5 million to build a new Community Hall. The government has approved the construction of community halls in Pusa and Beladin, each at a cost of RM3.5 million.

Social Problems

Recently, incidents of property theft have become rampant in Kampung Kabong. From the information received, these crimes are committed by drug addicts. Drug abuse is also increasing, especially among young people. It is hoped that enforcement agencies such as the Royal Malaysia Police (PDRM) and the National Anti-Drugs Agency (AADK) can eradicate drug abuse in Kabong. Therefore, I support the proposal of the Honourable Member for Daro that AADK set up offices in every district. The problem of alcohol consumption has also been identified as a contributor to the rise in crime in Kampung Kabong. The population of Kampung Kabong is made up of Malay Muslims. Consuming alcohol is an offence under the Islamic religion. We hope the Islamic Affairs Department can help by arresting and prosecuting those who consume alcohol. The responsible local authorities should act against the sale of alcohol, and if licences have been issued, they should be revoked.

Rubbish Problem in Kabong Town

I am very saddened to have to admit that Kampung Kabong is very dirty, with rubbish scattered everywhere. It is indeed difficult to educate the people of Kabong not to dispose of rubbish carelessly. The people of Kabong must realise that living surrounded by rubbish will invite many problems, especially the spread of diseases such as dengue, typhoid and others.

I request that the Saratok District Council help find a way to clean up Kampung Kabong.

Access Roads to Farms

YB Encik Mohd. Chee bin Kadir: The Kabong area has many smallholders who cultivate oil palm. The roads leading to their farms were built by government agencies. However, recently the maintenance of these roads has deteriorated badly and they are difficult to use, and the smallholders cannot transport their produce to sell. Not only are market prices low, but the harvest also cannot be sold because the roads cannot be used. We humbly ask agencies such as DID, IADA and the Department of Agriculture to help by repairing and upgrading the roads of the smallholders that have been damaged, so that the hardship of life for smallholders can be eased.

Establishment of Regional Development Agencies

His Excellency the Yang di-Pertua Negeri, in his speech, welcomed the establishment of Regional Development Agencies such as the Upper Rejang Development Agency, Highland Development Agency, Northern Region Development Agency and Integrated Regional Samarahan Development Agency, which can accelerate the implementation of development projects in those regions.

Deputy SpeakerEN

Member of Kabong, you’re running out of time. Can you conclude?

Honourable Encik Mohd. Chee bin Kadir: Yes, about to, Mr Speaker. As fellow members representing coastal areas, I would once again like to plead and call on the Government to establish a Coastal Development Agency. This is in line with the hope of His Excellency that development of the regions in this state be expanded by providing infrastructure and aggressively developing economic potential.

Construction of an Electric Railway from Kuching to Miri

Railways are an efficient and competitive form of public transport, used in developed countries and implemented for a long time up to today. In Malaysia too, rail transport is used in Malaya and in Sabah.

I would like to propose that a study be carried out to build an electric railway from Kuching to Miri. Electrical power to run the railway could be channelled from the hydro sources of Bakun, Batang Ai, Murum and the future Baleh. Abundant, environmentally friendly and cheap electrical power will give great competitive strength to the operator of that electric railway later on.

Finally, before ending my speech, I extend my wishes for a blessed fasting month of Ramadan to my Muslim friends and a Happy Hari Raya Aidilfitri. To my Dayak friends, I extend Selamat Hari Gawai Gayu Guru Gerai Nyamai. Hereby, I support the motion of thanks for the speech of His Excellency the Yang di-Pertua Negeri of Sarawak. That is all, thank you.

Deputy SpeakerEN

the Honourable Member for Lingga.

Assalamualaikum Warrahmatullahi Wabarakatuh and Salam GPS. Thank you, Mr Speaker, for giving me the opportunity to take part in the debate supporting the motion of thanks for the speech of His Excellency the Yang di-Pertua Negeri of Sarawak on 29 April, the other day.

Mr Speaker, last Tuesday the motion tabled by the Honourable Member for Samariang received the support of all the Honourable Members of GPS and PH in this august House. I offer my congratulations. This is GPS's effort to translate the wish of the people of Sarawak, who want the status of Sabah and Sarawak restored to their position at the formation of Malaysia in 1963. This is in line with the spirit and intent of the Malaysia Agreement 1963.

Rural Transformation Project (RTP)

Mr Speaker, the introduction of the Rural Transformation Project, namely RTP, which the Gabungan Parti Sarawak (GPS) began introducing in 2015, has truly had a positive impact on the people of Sarawak in the government's efforts to continue development in both urban and rural areas. Compared with other states in Malaysia, the Sarawak government's policy in introducing this RTP is people-centric. The implication, Mr Speaker, is that there are now fewer complaints from rural residents regarding the provision of basic and public amenities, because allocations for RTP projects have been distributed to every state constituency (DUN) in Sarawak. All of this shows that the government is always committed and, at the same time, has strategic planning and strong cooperation in producing good results.

Sarawak Poor Households Improvement Project

Mr Speaker, GPS is indeed always caring and consistent in serving the people through various development programmes, especially in helping those in greatest need. Since last year, the State Government has introduced the Sarawak Poor Household Improvement Project for low-income groups. This project has been well received by the people, especially those in rural areas. The people should be grateful and continue to give firm support to the present GPS Government to ensure the continuity of development for the progress and well-being of the people.

Baju petak dijahit sisi, Jahit dengan benang biru, Maju Sarawak GPS bervisi, Sakit senang rakyat di mercu.

A checkered shirt stitched at the sides, Sewn with blue thread, Sarawak advances, GPS has vision, In sickness and in health, the people stand at the peak.

65 Initiatives by the State Government of Sarawak

Mr Speaker, when speaking about development in all fields, I would like to share with this august House some countries such as Norway, which was once one of the poorest countries in Europe but is now one of the most prosperous countries in the world. It prioritised education and training to produce people who are competitive and productive. Likewise South Korea and Singapore chose military-style national service, namely defence and security, as a platform to produce citizens of high discipline to steer the nation in all aspects of life. If those countries are proud of their development in various fields, what is lacking in us in Sarawak? The Honourable Chief Minister has succeeded in implementing 65 development initiatives since he took the helm of the Sarawak State leadership on 13 January 2017.

These initiatives cover various economic sectors for the benefit of the people, including approaches to State revenue sources, comprehensive provision of basic amenities, establishment of strategic institutions, digital economic development and human capital. What is a source of pride for us, Mr Speaker, is that Bank Negara Malaysia forecasts Malaysia's economic growth at around 4.6% – 4.7%. However, Sarawak's economic growth will exceed the national economic growth, at around 5%. What is even more striking is the clever approach of the Sarawak Government in imposing a 5% tax on oil and gas, which has generated RM3 billion in income for Sarawak.

In my view, Mr Speaker, it is not impossible that one day our State will be the richest in this region. Moreover, when Sarawak's rights under the Malaysia Agreement 1963 are successfully restored, the benefits can be enjoyed by the people of Sarawak themselves. This is the aura of strength, sincerity and integrity of the Honourable Chief Minister and GPS in managing and serving the people and feeling the pulse of the people, in an effort to achieve inclusive and sustainable growth and to build a State that is competitive, progressive, has character and is strong in community life, in which races have been closely united for a long time.

Tinggi-tinggi si matahari, Anak tempua terbang senja, Visi yang Amat Berhormat Ketua Menteri bestari, Sarawak maju rakyat sejahtera

The sun rises high, The young tempua flies at dusk, The visionary Honourable Chief Minister's vision, Sarawak advances and the people prosper.

Therefore, let there be no parties who try to incite, make slanderous accusations and become a stumbling block, and who bring unhealthy political culture to this State. Let us, together with GPS, arrange our steps and strategies for the development of the people of Sarawak, rather than criticising, belittling and shouting here and there without reason, pretending to be heroes in fighting for the people's fate, yet producing no results. In my view, only GPS is a local party that understands and knows the problems of the people in this State, and it constantly works hard to ensure that development proceeds smoothly in this State.

Beli simen kilang Senari, Hendak membuat rumah sendiri, Kepada Yang Amat Berhormat CM tabik diberi, Siang malam memaju Negeri

Buy cement from the Senari factory, If you want to build your own house, To the Honourable CM, salutations are given, Day and night, advancing the State.

To the people of Sarawak, let us together support the leadership of the Honourable Chief Minister as a dynamic captain, far-sighted, with lofty vision and great aspirations, to ensure that the momentum of development continues in this State. We pray that the Honourable Chief Minister will always be given strength, health and long-lasting well-being, and that all his affairs be made easy.

Mr Speaker, I extend my thousands of thanks to the Honourable Chief Minister for approving several development projects in Maludam, such as new stalls, building a new mosque, a new building for SK Maludam, building a new community hall, upgrading the football field by building a grandstand, the Kampung Enlargement Scheme to create a modern village in Maludam, and building a new Maludam District Office, where all these projects, Mr Speaker, have been, are being and will be implemented. The people of Maludam warmly welcome this Government's efforts and hope that more infrastructure will be channelled to their area.

Issues in the Area

Upgrading the Maludam clinic and police station

Mr Speaker, after the political landscape changed on 9 May 2018, many matters have had to be examined before implementation so that duplication does not occur. Matters involving health and security are within the jurisdiction of the federal government, which should rightly be responsible for implementing them. However, due to the urgent needs of the people, I request that the clinic and police station in Maludam be upgraded, because both places, Mr Speaker, are very dilapidated and are no longer conducive for use. Likewise, the establishment of a bank branch in Maludam is badly needed; this is a request from the people there.

Project to upgrade and build a drainage system and floodgates in Maludam

We know that Maludam is located in a coastal and riverine area, which exposes its residents to the risk of river overflow during the rainy season. Therefore, I request that the Government build and rehabilitate drainage infrastructure such as drains, ditches, embankments and floodgates, and widen and deepen the river.

Agriculture sector

Following meetings and discussions with relevant agencies such as the Department of Agriculture and the Department of Lands and Surveys, an area of 464.5 hectares in Maludam has been identified for proposed development of an integrated agricultural project, as implemented in other places. The implementation of this proposed project, Mr Speaker, is expected to transform the economic landscape of the residents of Maludam village, especially in agriculture, as I have just mentioned.

Waterfront and Service Center in Lingga

In Lingga, as was previously informed, a Waterfront and Service Center will be built, including a football field that the youth in Lingga have long been waiting for.

However, so far there are no signs of implementing this project, even though its allocation was approved last year. I request that the Government and the relevant agencies take immediate action so that this project becomes a reality in the Lingga constituency.

Youth Entrepreneur Programme and Training Centre

I request that the Government implement a youth entrepreneur programme in the Lingga DUN. What I mean here is that this programme targets bumiputera youths aged between 18 and 30 who have a deep interest in engaging in the field of entrepreneurship.

Especially youths who have basic skills from training institutions or local skills centres. In my area too, there is still a shortage of training centres for youths. Therefore, I request that the Government establish a youth camp and a Centex in the Lingga DUN. This is what the youths in my area have voiced, so that they have facilities to be developed as in other places.

Previously I had raised the same problem, but until now it has not received attention from the Government. Therefore, I request that the needs of the youths in my constituency, Mr Speaker, be given immediate attention.

Erosion Problem

Previously, I often raised the issue of erosion in Kampung Hulu, Sri Aman, Mr Speaker. This issue is very critical and poses danger to residents, but until now it still has not received attention. Therefore, I request once again that the Government take proactive action to build a breakwater in the Kampung Hulu area of the Lemanak constituency to prevent the intrusion of water and stop erosion in the village, to ensure the safety of residents and to prevent their houses from collapsing due to landslides and erosion. Lingga also faces the same problem, where the lack of breakwaters causes their houses to be flooded with water. Likewise in Geran Sumbin, there is no systematic water channel, especially during the monsoon season. Most of the residences in their area are flooded with water, destroying their crops. I request that the Government conduct a comprehensive study and find solutions by building a proper drainage system in the areas concerned.

Problem of Water Pipes and Clean Water Supply

Mr Speaker, I often receive complaints and grievances from residents of the Sekaib, Geran Setumbin and Tanjung Bijah areas regarding the water pipes in Sekaib, which are often damaged and burst due to high tides and erosion in the area. We do not deny that the Rural Water Supply Department (JLAB) has made efforts to repair the damage, but Mr Speaker, it is recurring, always recurring, which causes the water supply to be cut off for up to three days.

The frequent shortage of water causes anger among the local residents, and Members of Parliament are often blamed. As a short-term and temporary measure while waiting for the project to upgrade the water pipes in Sekaib to be fully completed, I here propose that the Government relocate or place the existing water pipes, or those that have been repaired, in a safe location to prevent repeated damage.

What I mean here is, do not lay or install them in the old place because it faces the risk of landslides and high tides.

Assistance to Build New Longhouses

Mr Speaker, in my area there are still dilapidated longhouses that are unsafe to live in. Most of them plan to build new houses. Therefore I request that the relevant Ministry give consideration to helping them build new longhouses in their areas.

I hope that the proposal I have made will be accepted and taken into consideration by the Government. Before I end my speech, Mr Speaker, I take this opportunity to extend Selamat Menyambut Bulan Ramadan (Welcome to the Month of Ramadan), Selamat Hari Raya Aidilfitri and Selamat Hari Gawai Dayak to all friends and government officers in this august House, and especially to my people.

I also extend my highest appreciation and thanks to Datuk Amar Speaker and Mr Speaker and all those directly and indirectly involved in ensuring the smooth running of the House's splendid sitting this time. May Allah SWT bless these efforts. With this, I support the motion of thanks for the speech of His Excellency the Yang di-Pertua Negeri of Sarawak at the opening of the Sitting Assembly during the fourth session of the Eighteenth Sarawak State Legislative Assembly, the other day. Thank you.

Deputy SpeakerEN

Ahli Yang Berhormat for Pelawan.

Thank you Tuan Speaker. Tuan Speaker I rise to debate on the motion in appreciation of the speech delivered by His Excellency Tuan Yang Terutama in this august House on the 29th April 2019.

Tuan Speaker, after two days of debate on the motion of thanks, we can conclude the followings:

One, GPS lawmakers have lost it! They are trying to divert the failure of the GPS Government by attacking the PH Government. They only talked about the PH policies and never dare to discuss the failure of the State Government. Tuan Speaker, this august House’s responsibility is to scrutinize the performance of the State Government and hold the State Government to account. Let the MPs of GPS deal with the Federal Government in the Parliament unless they feel that their GPS MPs are not good enough.

Two, they have nothing new apart from the following:

(a) PH Government bully Sarawak. They talked about the projects that have been cancelled by the PH Federal Government not knowing that a lot of these so called project promised by Najib were just a bluff as there were not in the budget of 2018 tabled by Najib. And many of this so called reappraisal of projects by the PH government were either because it was not transparent such as without open tender or even over-priced project.

(b) They blame the slow economic on the PH Government and forgot that PH just took over and are busy cleaning up the mess created by Barisan Nasional and are paying the debt incurred under Barisan Nasional such as having the Finance Minister put aside RM37 billion in the 2019 budget just to refund the GST and income tax refund owed to the people by their “Bossku” Najib Government. Sarawak economic is not an island economy but subject to the volatility of the global economy such as the oil prices, palm oil and other commodities’ price and our currency is tied to the performance of our debt equity

ratio and the reputation of the Federal Government and Malaysia has to suffer due to the kleptocracy regime of Najib. (c) They even blame the dilapidated schools on PH Government while conveniently forgotten that these dilapidated schools existed due to decades of mismanagement of the Barisan Nasional and not because of the PH Government.

They shouted Sarawak First as if by shouting that slogan they are on the moral high ground and become the true defender of Sarawak rights ...(interruption)...

Deputy Speaker

Ahli Yang Berhormat for Pelawan, are you taking a question from Ahli Yang Berhormat for Lambir?

You give me injury time? Ya, why not? Go.

Encik Ripin Bin LamatPBB · GPSLambir

Ahli Yang Berhormat for Pelawan, just now you mentioned about the economic situation because of the kleptocracy by former Prime Minister Najib, but if you recalled back in 1998, our economic crisis. Is it not all because of the kleptocracy of the present Prime Minister?

Can I answer you now?

Encik Ripin Bin LamatPBB · GPSLambir

Ya.

In 1998, there was a world economic slowdown. A global economic slowdown and in Malaysia, we cannot escape from that. But there was no corruption in the scale of 1MDB where more than RM450 billion was stolen from the people of Malaysia. That was totally different from 1998.

Tuan Speaker, can I continue?

Deputy Speaker

Are you taking anymore question from Ahli Yang Berhormat for Lambir?

Encik Ripin Bin LamatPBB · GPSLambir

If we recalled back again during 1998, 1997. There are a few big cases like Pewaja, MAF, Forex?

Anymore? Okay, let me answer you. All these happened under Barisan Nasional and not PH. So don’t blame PH for what Barisan Nasional did. Come on lah my friend, be sensible. We can debate but it has to be sensible. Tuan Speaker, who was the Federal Government and the State Government in 1998? Barisan Nasional my friend. Isn’t it? There is no debate on that.

Deputy Speaker

Proceed. Ahli Yang Berhormat for Pelawan. I have given you injury time, can you proceed with your speech?

Okay, thank you. Don’t make a shame of yourself lah. You talk about Barisan Nasional all the timelah, please.

Three, they shouted Sarawak First as if by shouting that slogan they are on the moral high ground and become the true defender of Sarawak rights but if they are for Sarawak First, why didn’t they accept the offer from Pakatan Harapan Sarawak in the run-up to the GE14 to accept the responsibility for the education and healthcare of Sarawak in return for the 20% oil royalty and 50% tax revenue generated in Sarawak. Tuan Speaker, they speak about devolution of power and what else is more important than education and healthcare to Sarawakian? They just want the money without responsibility and forgot that the day of the Barisan Nasional is over and there is no more free-spending days like before. Number four Tuan Speaker.

Deputy Speaker

Ahli Yang Berhormat for Pelawan, there is a question from Ahli Yang Berhormat for Tupong.

Sure, I think they like it.

Thank you, the Honourable Member for Pelawan. The Honourable Member for Pelawan has said that before the election an offer was made by PH. I would like to seek clarification from the Honourable Member for Pelawan: was the offer made by PH Sarawak only, or has it indeed received approval from PH Central, or only from PH Sarawak? I only seek that clarification, Honourable Member for Pelawan.

Okay thank you, Ahli Yang Berhormat for the question. Actually you should pay attention in this Dewan. Ahli Yang Berhormat for Kota Sentosa yesterday answered already. Pakatan Harapan Sarawak with the consent of Pakatan Harapan Nasional gave the offer to our Chief Minister. It was refused by Sarawak, you should go and ask the Chief Minister. Thank you. Tuan Speaker, can I continue now. Pay more attentionlah, please, so that I don’t have to repeat what Ahli Yang Berhormat for Kota Sentoasa have answered before. They just want the money like what I said just now Tuan Speaker.

Four, while PBB Members were shouting bully and U-turn policies of Pakatan Harapan, they forgot that PH Government listens to the people and adjusted their policies that are not welcomed by the voters unlike their BN master, UMNO, who just bulldozed through no matter what. They also forgot that if indeed Sarawak has been bullied by our Federal Government it was with their consent such as the PDA 1974, some of them mentioned, the downgrade of our position as one of the thirteen states 1976, the Territorial Sea Act 2012 and the National Security Council Act. All these were done with the consent of GPS Sarawak.

Five, Tuan Speaker, the SUPP law makers are playing the game of deceit. Member for Batu Kitang and Batu Piasau both talked about “Referendum” in the debate and I have few questions to ask them.

(a) Why did they bother to go against a motion on citizen Initiated Referendum Bill 2017 by Ahli Yang Berhormat for Batu Lintang on 14th May 2017? Tuan Speaker, to refresh your memory, when the vote was taken on that day, the Distinguished Datuk Professor Dr. Sim, Ahli Yang Berhormat for Batu Kawa and Minister for Local Government and Housing ran away from this House and was nowhere inside this Dewan. What a show by SUPP. Now you talk about referendum. When there is a vote you roted against it.

(b) If SUPP really want a referendum, why didn’t their members in the State Cabinet initiate a Ministerial Motion to do so this time?

Even if their Minister didn’t want to table a Ministerial motion, Ahli Yang Berhormat for Batu Kitang and Piasau can still table a private member motion, why didn’t they? Hypocrite Tuan Speaker! They thought Sarawakians are stupid and tried to paint that SUPP want to give people the referendum.

Tuan Speaker, actually they are playing a very dangerous game. Political Secretary of YAB Chief Minister, from SUPP they went to the rally of Sarawak Big 6 movement, they went to S4S rally and asking Sarawak to withdraw from Malaysia and they actually bring this dispute to YAB Chief Minister in the action. I have the newspaper cutting, I can show you …. (interruption)

Mr Speaker

You can show me only the newspaper report ya?

….(Continue)Ya, you were there and the guest speech and all this thing.

Sibu Development

Tuan Speaker, my comrade and colleague, Honourable Member for Bukit Assek rightfully put it in her debate that we need a master development blueprint for Sibu. Tuan Speaker, Sibu has been better days during the boom days of the timber industry and we have one of the highest number of student with higher education among all the towns in Malaysia.

But then, it was ignored over the past decades and now it really becomes a town that has been neglected by the Government. The infrastructures of Sibu is in such a sorry state that I am lost for words to describe them.

To date there is no flyover in Sibu, the drains in the centre of the town are the same as 40 years ago, the roads are bumpy and those travelling in the cars are like riding the waves on the river. Tuan Speaker, I have to highlight the needs for upgrading Jalan Ulu Sg. Merah, Jalan Oya, Jalan Igan on several occasions in this House. I urge the State government to immediately set up a team comprising the officials of Ministry of Transportation, the Local Councils and the District Office to look into the upgrading of these roads immediately.

Tuan Speaker, the development in Sibu was brought about the private sectors instead of the public sector. Jalan Ulu Sg. Merah for example has been the construction of more than 1,000 houses and has two schools along it with thousands of student and yet it still remainS the same single lane road that was constructed more than 20 years ago. Can you imagine the jam along the road during the morning and evening rush hours, if a car broke down then it will create of kilometres of traffic jam?

I have in 2015 submitted a RM 70 million Sibu outer-link proposal to our late YAB Chief Minister Tok Nan and I have follow up on the said proposal tirelessly because I know Sibu deserves better and the Government has the responsibility to bring about infrastructure developments. “For more than 15 years, there has been no new road been constructed in Sibu. There are massive traffic jams during rush hour – morning, afternoon and evening. The proposal was to build three new roads and upgrade an existing road in Sibu for about RM70 million.

One of them is at the Jalan Wong King Huo roundabout, connecting to JPJ, which is about 4.5km. There will be a by-pass in the middle. We estimate it cost about RM30 million. Another one is connecting a residential area to another by constructing a bridge across Sungai Merah. That would cost around RM10 million.

Another one is Teku Road to Sibu Golf Club area. A lot of those in Kampung Dato Kampung Nangka will be relocated to this golf club area, so that road would be around 7km, costing around RM20 million. One of the oldest roads in Sibu – Jalan Oya – needed upgrading, too. The stretch from SMK St. Elizabeth to the traffic junction that would cost about RM10 million.

Tuan Speaker, with a budget of RM11.9 billion in 2019, there is no reason why the YAB Chief Minister cannot allocate RM70 million to Sibu.

State government vs Federal government

Tuan Speaker, the GPS State government must state its position on the directive issued by our State Secretary to Residents to direct all Ketua Kaum dan Ketua Masyarakat not to attend any function… (Interruption)

Mr Speaker

Honorable Member for Pelawan, Honourable Member for Nangka want to ask a question.

Ya.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

Thank you Honourable Member for Pelawan.

Encik David Wong Kee WoanDAP · PHPelawanEN

Yes.

Deputy Minister of Education, Science and Technology Research and Deputy Minister of Housing and Public Health (YB Dr Haji Annuar Bin Rapaee): You mentioned about the road from Kemuyang to pass the Golf Course just now, is it

Teku Golf site.

Menteri Muda Pendidikan, Sains dan Penyelidikan Teknologi dan Menteri Muda Perumahan dan Kesihatan Awam (YB Dr Haji Annuar Bin Rapaee):Ya, no the golf course at Kampung Datuk to move most of them to Teku, not the Teku, it is actually the Kemuyang road. Just for your information, there has been a Committee formed to look into that road but I just want to ask you on your thoughts here. You have mentioned a lot about Sibu, you are also from Sibu, I’m also from Sibu. The fact that we have two Member of Parliaments from Sibu which is now in the government, am I right?

Yes.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

They are in the Government.

Correct.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

Previously they are in the Opposition.

Ya.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

Okay, and they are Ahli Dewan Undangan Negeri in government. In fact, we are very lucky you know?

Ya

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

The MPs are Government and the ADUNs are also Government.

Yes.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

Some of the Opposittion, you think that we can work together, the MPS.

Ya.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

Can you ask the funds from the Federal Government?

Yes.

Dr Haji Annuar Bin RapaeePBB · GPSJunior Minister of Education, Science and Technology Research and Junior Minister of Housing and Public Health · Nangka

Rather than we depend so much on the State government.

Ya, for the information of Honourable Member for Nangka, we have to work together, we have to work together to bring development to Sibu. Put politics aside, that I have to agree and we will try our best to bring funds from the Federal government as well. Thank you.

State government vs Federal government

Tuan Speaker, as I mentioned just now, the State Secretary issued directive to all the Residents to direct all Ketua Kaum dan Ketua Masyarakat not to attend any function or activities not organized by the GPS Government. That directive is in fact to forbid all the Ketua Kaum and Ketua Masyarakat not to attend the Federal Government’s functions or events.

On the other hand, the GPS wants to use the Federal Agencies for their political purposes by demanding access to schools, hospitals, police department and even demand RTM to carry their news.

Tuan Speaker, what GPS did was in fact splitting the people and communities for their selfish political agendas. How can Ketua Kaum and Ketua Masyarakat take side in politics when they are suppose to serve the people and the community they represent without fear of favour?

Tuan Speaker, I urge the YAB Chief Minister to stop taking a confrontational stand against the Federal Government as both have a role to play to bring development to Sarawak, we cannot have a State and Federal Government at their loggerhead if we want to bring about developments and to restore our Sarawak rights under MA63. Whether we like it or not, the Federal government always have an upper hand because of the concentration of power and resources in their hand because of the Federation we are in.

Sarawak Resources

Tuan Speaker, many have labelled Sarawak State for the political elite in the cronies and they accused the State Government of formulating policies to enrich their cronies and businessman friendly to GPS. How true was the above accusation? In my observations, I believe the above description is fair comment. While GPS complained that Sarawak has been exploited by the Federal Government in term of oil and gas, how about the timber industry? How about the land, both NCR and State land? They are all under State Government.

We have seen the Big six dominated the land ownership with tens of thousands of hectares and natural resources such as timber were all controlled by them. Over the past 40 years, the elites in Sarawak have total control over the distribution of the wealth of the State while the average Sarawakian cannot even own a house with the 4 points of land.

We have seen NCR and State land being given to the oil palm big corporation instead of small farmers and while the giant corporations enjoy the windfall we were left with an environment destroyed by them. The latest incident near Mulu Cave is another example of the exploitation of the people by our Sarawak elites backed by the GPS.

Tuan Speaker, it’s worried me when the Assistant Minister for Natural Resources told this House yesterday, in his reply to Honourable Member for Batu Lintang that we have four million hectares (32% of our land mass) for agriculture development and three million hectares of the four million has been assigned to the planting of oil palm. Tuan Speaker, we all know oil palm plantation is bad for our environment and while we want to develop our land for revenues we must be aware that the oil palm plantations are concentrated in the hands of a few elite groups which do not employ local people and over dependency on this sector is not wise and benefit only a small percentage of the population. Enough is enough for the oil palm plantations in Sarawak. If there was mismanagement in Sarawak, we would not be in such a State of backwardness where many are still without electricity and piped water supply.

GPS Must Be Fair To All Sarawakian

Tuan Speaker, GPS must be fair to all Sarawakian. Tuan Speaker, the GPS government is a government of hypocrite who contradict themselves. The CM has promised to be a CM for all Sarawakian when he took over the Chief Ministership but he has failed his promises, our member from Pending rightly put it that the CM has promised that the PH member of this House will be given grants last year and it was reported in all the news. But until today, Iban jako, “satu sen pan nadai” for the PH member of this House.

The GPS member of this House was given two million in MRP, five million in RTP and one million in House improvement grants by the State government and yet PH member was not given a single cent. Where is fairness and justice?

Tuan Speaker, when the GPS want the PH to support their Motion, then they say, “we are all Sarawakians…” but when they don’t need our support, then they treated us like enemies and forgot that we were here because the people in our constituencies voted us to be here.

Mr Speaker

Ahli Yang Berhormat for Pelawan, can you wind up. I’ve given you four extra minutes now.

Okay. To punish PH members of this House is akin to punishing the voters in our kawasan, Tuan Speaker. Can the YAB Chief Minister tell us whether all of these voters are Sarawakian or not? It is another example of hot air by our GPS government.

Tuan Speaker, the State Government is mere trustee of the resources and coffer of the State. They don’t own them. The wealth, resources, belong to all Sarawakians and the people of our kawasan must be given the fair and equitable resources and their elected representative has all the right to receive funding from the State Government.

Tuan Speaker, the GPS government cries like a baby saying that the Federal Government has not been fair to them and brought up schools, healthcare, grants and development funding, all these, but why don’t they ask themselves whether they have been fair to all Sarawakians? How about showing the Federal government what fair play is all about? With the ongoing negotiation on MA63, more power will be devolved to Sarawak such as tax revenues and devolution of power..(interruption)

Mr Speaker

Okay, Ahli Yang Berhormat for Pelawan, you are out of even injury time.

Okay. How could GPS be trusted to safeguard Sarawak interests if they can’t treat all Sarawakian as Sarawakian? With that, thank you Tuan Speaker.

Mr Speaker

Honourable Member for Balingian.

Encik Abdul Yakub Haji ArbiPBB · GPSBalingianEN

Thank you, Mr Speaker. Bismillahirrahmanirrahim, Assalamualaikum warahmatullahi wabarakatuh, greetings of peace and greetings to my motherland, Ibu Pertiwiku. Put Sarawak first.

Thank you, Mr Speaker, for giving me the opportunity to take part in debating the motion of thanks for the Address by His Excellency Tun Pehin Sri Yang di-Pertua Negeri Sarawak at the Opening of the First Meeting of the Fourth Session of the Eighteenth Sarawak State Legislative Assembly (Dewan Undangan Negeri Sarawak ke-18) on 29 April last.

Mr Speaker, I welcome the call of His Excellency Tun Pehin Sri Yang di-Pertua Negeri for us to continue the development agenda in the interests of the people of the State of Sarawak. This is because the fate of our people rests in our hands as leaders who have been entrusted with this responsibility, especially us who are in the current State Government. Our struggle to defend the fate of the people has been proven through our political maturity, which we have translated into the administration of this State.

Among other things, this struggle has been demonstrated through the Motion to Amend the Constitution of Malaysia, which was unanimously supported by all Members of this august House on 30 April last. Congratulations to the Honourable Member for Semariang, who succeeded in proposing six more comprehensive amendments so that Sarawak's status as an equal partner can be restored, and so that the Federal Government is made to refer to the Malaysia Agreement 1963 (MA63), instead of the Federation of Malaya Agreement 1957.

Mr Speaker, on this occasion I also wish to record congratulations to all 19 GPS Members of Parliament who took a neutral stance during the tabling of the Bill in Parliament on 9 April last. As we all want, the Bill would have no meaning if it did not contain the words "Pursuant to MA63". If the Bill were regarded as the first step for us to move on in claiming Sarawak's rights, as shouted out by those on the other side, I am very worried that this would not happen that way, because the current Federal PH Government is not only an expert in "u-turns", but also an expert in making "roundabouts". Agreeing to the Bill without including "Pursuant to MA63" is like signing a blank cheque. Does the other side want to sign a blank cheque that does not state any value? They are also prepared to incite the people of Sarawak, my motherland, to hate the Government currently in power.

Some of the Honourable Members on the other side also constantly link or "align" the Honourable Members from GPS with UMNO and PAS, such as the accusation from Pujut. This is not true, because we are a Sarawak party that puts Sarawak first. The truth is that it is those on the other side who are subservient to their "Big Boss" from Malaya. They are merely yes-men for the sake of their political survival, and they are also used to straightening out wet threads.

Mr Speaker, my heartiest congratulations to the Honourable Member for Bukit Assek and the Honourable Member for Batu Lintang, who made a very sincere statement in this august House on 30 April last, clearly stating that they would give their side time to correct the mistakes they had made in Parliament in supporting the Bill. However, this kind of thinking is not shared by the others, who instead keep accusing GPS of colluding with Barisan Nasional, which has eroded many of Sarawak's rights. What has happened has indeed passed. The important thing is for us to move forward together as leaders of today, striving and struggling for the progress, prosperity and development of Sarawak.

Mr Speaker, on this occasion I also wish to record congratulations to Yang Amat Berhormat Datuk Patinggi Abang Abdul Rahman Zohari Tun Abang Openg, Chief Minister of Sarawak, together with all Cabinet Members and also all the Honourable Members who have fought for MA63 to ensure the progress and development of Sarawak to the pinnacle of excellence as desired by all of us, including those on the other side. A reminder to the other side: do not be too hateful towards the State Government, and do not be willing to tear the people apart with incitement and slander.

Mr Speaker, allow me to go on to touch on issues, problems and development in my constituency, in line with the mandate of His Excellency, who wants rural development to be prioritised. I hope to receive due attention and consideration from the relevant agencies.

Rural Electricity Supply Scheme

I request the Sarawak Government, through the Rural Electricity Supply Scheme, to expedite electricity supply to four longhouses in the Bayan Ulu/Ulu Bandengan area and five longhouses in the Sungai Liuk area that have not yet received supply until now.

Telecommunication Towers

I request the Government to add telecommunication towers in the areas of Setejok, Setuan Kecil, Setuan Besar, Kuala Balingian, Daerah Kecil Balingian, Sungai Liuk, Sungai Maben, Bayan Tasik, Bayan Ulu/Badengan Ulu and Temesu, considering that these areas have telecommunication signal problems. This is very important in line with the Government's aim of encouraging the participation of the people in the digital economy.

Mukah No. Two Bridge and Tellian Bypass

On 24 September 2018, the Honourable Deputy Minister of Coastal Roads (Menteri Muda Jalan Pesisir) had already made a visit to the proposed site for the construction of the Mukah No. Two Bridge and the Tellian Bypass road, as well as receiving a briefing from the Public Works Department (JKR) Mukah. I very much hope that the proposal submitted to the Ministry can be implemented quickly. This is for the convenience and comfort of our people should anything happen to the existing Yellow Bridge, which we call the Yellow Bridge, the only link between Mukah Town and Balingian and other places. As the saying goes, misfortune does not announce itself.

Clean Water Supply

Clean water supply is one of the basic needs of the people. It has often been a complaint of the people because of problematic water supply in certain areas within N.58 Balingian Constituency. In view of this, I request the Sarawak Government to expedite efforts to upgrade the clean water supply in the areas of Daerah Kecil Balingian, Kuala Balingian, Setuan Besar, Setuan Kecil, Setejok, Sungai Maben, Bayan Tasik, Bayan Ulu, Bukit Ambun, Sungai Liuk and Temesu.

Balingian Mini Stadium

Mr Speaker, youth and sports go hand in hand. In fact, it will keep the youth away from negative elements. Providing a place for the youth and local residents to relax and engage in sports is very important. In addition, it is a need of the primary schools nearby, as well as for holding large-scale community activities in Balingian. Therefore, we request the Government to upgrade the Balingian Mini Stadium, which is equipped with a grandstand, track, a field fitted with sub-soil drains, and stadium lights.

Lots in the Village Expansion Scheme

I request the relevant Ministry to expedite the distribution of 116 lots in Phase 1 and Phase 2 of the Kampung Baru Balingian Village Expansion Scheme, 173 lots in the Kampung Baru Kuala Balingian Village Expansion Scheme, and the Kampung Jembungan Village Expansion Scheme. Quick and prompt distribution will give residents who need lots the opportunity to build their homes.

The Balingian Village Expansion Scheme has already been handed over to the Housing Development Corporation (HDC), and the ballot for the People-Friendly Housing Programme (Program Rumah Mesra Rakyat, RMR) was already held on 15 August 2017. However, until today there has been no news from the parties concerned. This has caused the residents involved to wonder where the applications and the ballot results made earlier have gone. In view of this, I once again also request that the Permata Scheme be implemented in the Balingian SPK here.

Upgrading of Village Roads, Drains and Wooden Bridges

Dilapidated village roads and an ineffective drainage system require repairs at an urgent rate in the Kampung Tutus Ulu, Mukah area, Kampung Kuala Balingian, Sungai Alo Village Expansion Scheme, Kampung Masjid, Kampung Lintang, Kampung Baru and Kampung Suyong, Balingian.

This includes a wooden bridge in Kampung Suyong that is nearly collapsing and needs to be replaced with a concrete bridge. I ask the authorities concerned to take immediate action.

Erosion Barrier at Kampung Litong and Balingian Market

I would like to propose to the relevant Ministry that a river erosion barrier be built at Kampung Litong, Mukah, and that the erosion barrier at Balingian Market be extended, considering that these two areas just now face a very serious erosion problem.

SMK Balingian

Mr Speaker, the construction of SMK Balingian, or Sekolah Menengah Kebangsaan Balingian, is a project long awaited by the people in N.58 Balingian Constituency. The construction of SMK Balingian under the implementation of the Eleventh Malaysia Plan (RMK11) (a continuation of RMK10 as approved) is hoped to be expedited so that SMK Balingian can benefit the residents of Balingian in future.

Up to now, there is still no secondary school established in Balingian, and primary school pupils continue their secondary education in Mukah, which is nearly two hours' drive away, taking into account residents in the Kuala Balingian and Pekan Balingian areas.

It is hoped that the implementing agencies and the Ministry responsible will take serious note of educational infrastructure for rural people, especially in the N.58 Balingian area.

Dilapidated Schools

There are schools in N.58 Balingian area that are at risk of disaster and are dilapidated. This matter is very serious and may possibly lead to political issues in my constituency. Therefore, we request the Government to relocate SK Kenyana and SK Jebungan to new sites.

Government Rest House, Balingian

The Government Rest House, Balingian was already burnt down on 6 March 2012, and now the site presents a bad image. I request that the Government build a new Rest House. And with the new Government Rest House built, it would be easier to arrange accommodation for any officers from Government agencies or outside who visit Balingian, because Balingian has no hotel.

Kuala Balingian and Balingian Food Centre

Thank you to the Government for building the Bintulu-Mukah coastal road. Increased vehicle traffic along this road can boost the economy of the local residents, especially in Kuala Balingian and also in Balingian. With this, I request that a food centre (Anjung Selera) be built in both of these places.

The existence of this food centre later will also overcome the problem of hawkers who set up stalls along the roadside, which endangers health.

Finally, on this occasion too, I wish to extend greetings for a blessed fasting month of Ramadan, which is about to arrive, and Selamat Hari Raya Aidilfitri to all my Muslim friends, and to my friends from the Dayak community, I extend Selamat Hari Gawai Dayak 2019.

To Mr Speaker, I extend congratulations and thanks for the excellence in conducting the proceedings of this State Legislative Assembly. Therefore, I hereby support the motion of thanks for the Address of His Excellency the Yang di-Pertua Negeri of Sarawak. Thank you.

Mr Speaker

Honourable Member for Murum.

Encik Chukpai UgonPRS · GPSMurumEN

Thank you, Mr Speaker. Greetings and peace to all, and greetings to my beloved motherland.

Thanks be to God, for by His abundant love and blessings I have once again been given the opportunity to take part in the debate on the motion of thanks for the speech of His Excellency the Yang di-Pertua Negeri of Sarawak at the Opening Ceremony of the First Meeting of the Fourth Session of the Eighteenth Sarawak State Legislative Assembly (DUN Sarawak) in this honourable House on Monday, 29 April 2019.

Mr Speaker, I express my gratitude for the opening speech of His Excellency, which touched on many aspects that are very meaningful and comprehensive to be taken as lessons and guidance for all of us as Members of the People's Representative Council, who serve and devote ourselves to the people.

In His Excellency's speech, emphasis was given to the importance of maintaining racial harmony and unity, economic development, infrastructure, human capital, poverty eradication, urban wellbeing, security issues, the environment, the aspects of integrity, and the quality of the Government's public service delivery system. These are the foundation and pillar for the stability and peace of the State of Sarawak, so that Sarawak may achieve the status of a developed state with high income before becoming a developed state by 2030.

Utamakan Sarawak

Mr Speaker, the Gabungan Parti Sarawak (GPS) with the slogan Utamakan Sarawak (Put Sarawak First) is very fitting for us to fight for and protect the rights and interests of the State, so as to ensure the continuity of development for the wellbeing of the people of the State of Sarawak.

Therefore, to ensure that all the people of this State can enjoy the benefits of the development that is and will be implemented, the Sarawak Government always puts the people first, based on more inclusive (inklusif) policies. For example, all the development policies and plans introduced are appropriate and meet the needs of the people, or are people-centric.

Accordingly, it is a priority of the GPS Government to restore Sarawak's status as an equal partner, to restore Sarawak's rights that have been eroded, and to preserve the legislative and executive powers of Sarawak, Sarawak's special privileges, its borders, land, natural resources, immigration autonomy and financial autonomy, as enshrined in the Malaysia Agreement 1963 (MA 63).

All the people of Sarawak should rightly unite, regardless of political affiliation, race and religion, to together fight for and defend Sarawak's rights, and continue to support the noble efforts of the Honourable Chief Minister with the spirit of Utamakan Sarawak for the sake of this beloved motherland.

Mr Speaker, on this occasion too, I wish to record my highest appreciation and congratulations to the Honourable Datuk Patinggi (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Chief Minister of Sarawak, for having succeeded in implementing efforts and initiatives covering various economic sectors for the benefit of the people since taking over the leadership of the State of Sarawak on 13 January 2017.

Issues in DUN Murum

Mr Speaker, on this occasion, please allow me to put forward several issues that require the attention of this honourable House, involving my constituency of N.66 Murum.

Need for a Fire and Rescue Station in BRS Sg. Asap

Mr Speaker, recently we were once again shocked by a fire tragedy that involved 44 doors of a longhouse and a church in Uma Bawang, BRS Sg. Asap, which were destroyed by fire. It is very saddening that this tragedy resulted in 96 families and 499 victims being left with nothing but the clothes on their backs.

For the information of this honourable House, the fire tragedy in Uma Bawang is the 11th tragedy to occur around BRS Sg. Asap, which razed 259 doors of longhouses.

Therefore, I appeal to the Government that a Fire and Rescue Station be built in BRS Sg. Asap as a matter of urgency. This is because we can no longer bear to see fire tragedies of this kind occur, causing the loss of property of inestimable value.

Mr Speaker, it is very distressing that the nearest fire station to BRS Sg. Asap is about 200 km away, namely the Bintulu Fire and Rescue Station. The journey for rescue assistance from that fire station takes three hours to reach BRS Sg. Asap.

Because of this situation, I feel that this need is very urgent. I believe that if this fire station is built in BRS Sg. Asap, it will serve about 20 thousand people and some 50 longhouses in the surrounding area, including the Tubau area.

Mr Speaker, accordingly, on behalf of the victims of the recent fire tragedy, I convey their voice and extend a thousand thanks, especially to the Honourable Chief Minister because he has announced the approval of aid amounting to RM70 thousand for each door to rebuild their homes, and this aid will surely lighten their burden.

For the information of this honourable House, we are deeply concerned that of the 259 longhouse doors that have been burnt around BRS Sg. Asap, there are 116 doors that are still unable to rebuild their homes, including the 44 doors in Uma Bawang that were recently burnt. We hope this aid can be implemented quickly.

In the meantime, on this occasion, a thousand thanks are also extended to all Government agencies, politicians, volunteers, associations, NGOs and all the people of Sarawak, who have been very caring and have stepped forward to give support, contributions and assistance to the victims. We are unable to repay the kindness and good deeds of all of you. We can only pray that God will continue to bless you all abundantly.

Issues of the Bakun and Murum Resettlement Schemes

Mr Speaker, as I have previously raised in earlier sittings, once again I wish to draw the attention of this honourable House to the Government settling the issues that are now critical in the Bakun and Murum Resettlement Schemes. Among them are:

(a) Issuance of land titles and house lots; (b) Repayment of Land and house premiums; (c) Provision of replacement land for unsuitable agricultural lots; (d) Allocation of promised additional land; (e) Applications for residential lots and agricultural lots for Extended Families; (f) Survey of Temuda, NCR and NTD land for lands that were not submerged in Lake Bakun; (g) Payment of compensation for unsettled land and cemetery claims; (h) Repair of residential houses in BRS Sg. Asap that are increasingly dilapidated; and (i) Expediting the implementation of Sustainable Livelihood Crops for residents in the Metalun and Tegulang Resettlement Schemes.

Infrastructure / Village Roads

Mr Speaker, in the previous sitting, I put forward several roads that are very critical to be built in the N.66 Murum constituency.

Accordingly, I seek clarification from the Public Works Department (JKR) Sarawak regarding the status of my applications for these roads, which include:

(a) New construction of an alternative road to SK Kuala Kebulu; (b) Upgrading of the Former Timber Road to Ulu Jelalong, Tubau; (c) Upgrading of the road to Rh. Mering Madang / Rh. Wan Usin / Rh. Lasah Tuba / Rh. Pesu / Rh. Resah / Rh. Ramli, Tubau; (d) Upgrading of the road to Rh. Ding / Rh. Ugak, Tubau; (e) Upgrading of the road to Long Bala; and (a) Upgrading of the road to Long Koyan.

Treated Clean Water Supply and Electricity Supply

Mr Speaker, I have raised the problem of the treated clean water supply and electricity supply almost every time we sit in this honourable House, especially for the longhouses in the areas of Jelalong, Tubau, Long Bala, Long Koyan, Long Urun and Sg. Linau.

I request that the Ministry responsible provide clarification regarding the initiatives that have been taken and the status of their implementation to resolve this very important problem in DUN Murum.

Telecommunications Transmitter Towers and Structures

Mr Speaker, there are many areas in the N.66 Murum constituency that have yet to enjoy facilities. Therefore, I request that more of these facilities be built in interior areas such as Tubau, Jelalong and Sungai Linau.

Dilapidated Schools

Mr Speaker, like other interior areas in Sarawak, the condition of schools in the DUN Murum area is also very dilapidated. Among them are SK Lusong Laku, SK Long Urun, SK Kuala Kebulu, SK Bukit Balai, SMK Bakun, SK Batu Keling, SK Long Gang, SK Tegulang and SK Metalun. These schools are in a state of severe lack in terms of facilities.

Therefore, my hope is very great that these schools will be given attention so that children from interior areas can acquire knowledge in a more conducive, proper and comfortable environment. Health Facilities

Mr Speaker, I would like to propose that the Health Clinic in BRS Sg. Asap be upgraded to hospital status to meet the needs and the increase in population. I also request that the health clinics newly built in the Metalun Resettlement Scheme, Tegulang, Long Urun, Ulu Sg. Linau and also in Ulu Jelalong be upgraded.

Strengthening the Agriculture Sector

Mr Speaker, the agriculture sector cannot be separated from the lives of the people in the interior areas. Therefore, I would like to suggest that the Ministry of Agricultural Modernisation, Native Land and Rural Economy, through the Sarawak Department of Agriculture, conduct a comprehensive study to identify agriculture or crops with high-impact commercial value that can be developed in the DUN Murum area by applying modern agricultural technology.

Accordingly, I propose that a Food Production Park be established in the Murum area, and that a Agricultural Produce Collection Centre and Village Products Centre be set up in Sg. Asap, as well as Agricultural Stations be established in Tubau, Long Urun and Lusong Laku, to sustainably transform the socio-economy of the residents in this area.

Police Station and AADK in BRS Sg. Asap

Mr Speaker, enforcement agencies are a necessity to be established in every district to ensure the safety and wellbeing of the people. Therefore, I request that the police post in BRS Sg. Asap be upgraded to the status of a permanent Police Station. At the same time, Narcotics Officers should also be posted at the station, including Drug Prevention Education Officers, particularly in secondary schools, and the National Anti-Drugs Agency (AADK) should set up an office in BRS Sg. Asap. This request is necessary given the drug abuse problem in the DUN Murum area, which is becoming increasingly serious and rising.

Mr Speaker, my hope is very great that the Government can give serious attention and settle the matters I have mentioned above as a matter of urgency. I will not stop bringing these matters to this honourable House for as long as they have not been resolved, for the sake of my people in DUN Murum.

Conclusion

Mr Speaker, to conclude my speech, on this occasion I wish to extend best wishes to all my Muslim friends for observing the fasting month in the blessed month of Ramadan, and a Happy Hari Raya Aidilfitri that will soon arrive.

Meanwhile, to my friends of Dayak descent (kaban belayan) who celebrate Gawai Dayak Day, Happy Gawai Dayak Day is extended: Gayu Guru Gerai Nyamai, Lantang Senang, Nguan Menua. Congratulations and commendations to Mr Speaker for having successfully conducted this session so wisely, professionally and excellently. Not forgetting the officers of this honourable House and all Government agencies that have shown a high commitment in carrying out their respective duties.

With this, I request to support the motion of thanks for the Address of the Opening Ceremony of the First Meeting of the Fourth Session of the Eighteenth Sarawak State Legislative Assembly in this honourable House, delivered by His Excellency the Yang di-Pertua Negeri on Monday, 29 April 2019.

Utamakan Sarawak. Sarawak First. God Bless Sarawak. Thank you.

Mr Speaker

Any other Honourable Members who wish to speak? Ada Ahli-Ahli Yang Berhormat yang lain hendak berucap? Jika tidak, Ahli-Ahli Yang Berhormat, the sitting is now adjourned and the House shall resume its sitting on Monday, 6th May 2019 at 9.00am.

(Mesyuarat ditangguhkan pada jam 5.16 petang)