Sarawak · 27 November 2023
19th Assembly, 2nd session, 2nd meeting (unedited) · not final · 29 turns · 34,719 words · official PDF ↗
ExperimentalSarawak publishes only unedited transcripts (Belum Disunting). The 19th Assembly was dissolved on 26 Oct 2026. Speakers are matched by our parser and will have some errors.
(Opening)
In the name of Allah, the Most Gracious, the Most Merciful. Peace be upon you and the mercy and blessings of Allah. Good morning and greetings of peace. Honourable Members, I have granted leave or absence under Standing Order 81 to Honourable Member Dato' Sri Huang Tiong Sii, Honourable Member for N.45 Repok, for today's sitting until Wednesday, 29 November 2023; Honourable Member Dato Sri Tiong King Sing, Honourable Member for N.52 Dudong; and Honourable Member Encik Azizul Annuar bin Pehin Sri Haji Adenan, Honourable Member for N.3 Tanjong Datu, for today's sitting.
CONTINUATION OF DEBATE ON THE SECOND READING OF THE RANG UNDANG-UNDANG PERBEKALAN (2024), 2023 AND MOTION TO REFER THE DEVELOPMENT EXPENDITURE ESTIMATES RESOLUTION FOR THE YEAR 2024
With all due respect, I invite Honourable Member Dato Sri Roland Sagah Wee Inn, Minister of Education, Innovation and Talent Development, and the Honourable Member for N.20 Tarat, Member of the Dewan Undangan Negeri (DUN), to deliver the winding-up speech.
Tuan Speaker, first and foremost, congratulations to you on your reappointment as the Speaker of this august House for another term. We are all very fortunate to have a person of your stature and high standing among your peers to preside and guide us. Congratulations from me, my Ministry, and my Constituents of N.20 Tarat.
Thank you for this opportunity to address this august House, and for me to reply on the matters raised in the debate, as well as on comments and invaluable input raised by Honourable Members pertaining to matters under the purview of my Ministry.
I would also take this opportunity to update on the achievements for the year and the plans for the upcoming year. In relation to the plans for upcoming year, I would like to express my appreciation to the Right Honourable Premier for the generous allocation totalling RM343 million approved for Education, Innovation and Talent Development during the tabling of the Supply (2024) Bill, 2023 on 20th November 2023.
I would like to begin my address on the favourite topic among Sarawakians manifested by the Members of this august House, that is the issue of dilapidated schools.
Policy makers would describe this issue as a Wicked Problem, first coined by Rittel and Webber in 1973. Wicked Problems can always be described as the symptom of other problems. As much as we wish that this issue is resolved amicably, we may partly own the problem, but we do not own the premises involved. This makes this issue challenging to address.
Thank you, Honourable Members for Tanjong Datu, Batu Kitang, Daro, Krian, Meradong, Murum, Katibas, Tebedu, Meluan, Serembu, Pelagus and Kalaka for highlighting the same issue from their respective constituencies.
The issue of dilapidated schools is not only localised to Sarawak but is happening nationwide. But that is no excuse for us to not address the issue. In our effort, there have been instances where Sarawak Government and Right Honourable Premier himself have approved State Allocations to relocate and redevelop rural schools. These schools are SK Ulu Segan, Bintulu; SK Maludam, Betong; SK Kampung Penasu, Daro and SK Pulo, Kuching. Funds were also allocated to upgrade and improve buildings and facilities at SK Merpati Jepang, Kuching; SK Abang Aing, Sri Aman; SMK Tun Abang Haji Openg, Kuching; and most recently SK Sageng and SMK Gedong, Simunjan.
This is not to compete, but to complement the effort put forth by the Federal Government. To be fair, we do understand that the Federal Government needs to prioritise budget allocation.
Tuan Speaker, when my Ministry was first established in 2017, a lab was jointly organized with Jabatan Pendidikan Negeri Sarawak or JPNS, to identify and categorize dilapidated school in the State, of which 1,020 were identified under three main categories. They are category 1 with 395 schools, Category 2 with 210 schools and Category 3 with 415 schools. The categories are based on technical department's definition based of 25%, 50% and 75% dilapidated condition of the overall school buildings.
However, in 2019, the Ministry of Education, Federal Ministry redefined dilapidated buildings category into a scale from 1 to 7 with scale 6 and 7 being the worst lot, that is upon verification by technical personnel from JPNS and Jabatan Kerja Raya or JKR. From this redefined category, there are 461 currently under scale 6 and 7. These categories are given top priority for repair and upgrading works.
In relation to this, I would like to update Members of this august House, that to date, 198 school repair and upgrading projects have been completed, so don’t confuse the one that is mentioned by the Ministry of Education (MOE), Malaysia while another 309 schools are at various stages of implementation.
On the request by Honourable Members for Serembu, Katibas and Meluan for new secondary schools, merging of under-enrolment primary schools and establishing Form 6 at SMK Julau No. 1 or SMK Julau No. 2, the requests will be studied and recommended to JPNS for further decision by MOE.
Tuan Speaker, Honourable Members for Pelagus and Ngemah requested for the establishment of technical institutions in their respective constituencies. While we recognise the need for TVET institutions in the rural areas, we must also be mindful of the ecosystem required for the setting up of the institutions.
For an institution to be sustainable, among others, it needs the support of industries in terms of expertise, industry attachments, apprenticeship, and more importantly a sufficient number of feeder schools.
However, responding to the Honourable Member for Jepak on the need for another TVET Institution, there are already currently, five technical institutions in Bintulu offering various industry-related and accredited courses. I believe there are sufficient number of youths in Jepak to enrol in these institutions.
Tuan Speaker, while I am on the topic of TVET, allow me to briefly touch on the Vocational School, now called Vocational Colleges in Sarawak. Currently, there are only six Vocational Schools or Colleges and one Technical School. We are made to understand that the number of applicants to these Schools far exceed their capacities. It seems that courses of Vocational Colleges are very popular among our youths, especially after Form 3.
Thus, we brought the matter to the attention of Minister of Education (MOE) of Malaysia, and the Deputy Prime Minister and Minister of Rural and Regional Development, on the need for more Vocational Colleges.
We even floated the idea for MOE to utilise existing State-owned technical institutions to provide vocational training. This approach of using existing facilities and resources would be faster to implement, as compared to establish a new Vocational College which could take up to five years. The advantage of vocational colleges is that students who have completed Form 3 prior to their enrolment, will still be within the school education system where we are able to provide career guidance and support.
On the other hand, once they leave the school system after Form 5, it would be less likely for them to enrol for vocational or technical courses. This will translate to the insufficient number of skilled talents to required meet the industry’s needs. We hope that the Federal Government will pay due attention to our views and requests, and duly consider our proposal.
Tuan Speaker, next, I wish to update Members of this august House on the progress of Devolution and Decentralization of Powers for Education under MA63. My Ministry have had a few engagements with the Ministry of Education Malaysia, both at the Ministerial and Officers’ level to deliberate on the matter. We have also made a representation at the Technical Committee of the Majlis Tindakan Pelaksanaan Perjanjian Malaysia. The Technical Committee is chaired by the Deputy Prime Minister and Minister for Plantation and Commodities Malaysia. The Technical Committee in principle agreed on the representation made by my Ministry and resolved that both MOE and my Ministry further deliberate to finalise the matters to be escalated for decision by the main committee chaired by the Right Honourable Prime Minister.
In the course of our deliberation, MOE has indicated favourably on the decentralization of authority particularly for those of administrative in nature, from MOE to JPNS. However, we have yet to receive an official response for the arrangements on how the decentralization of authority is to be realised. Once this is realised, approval for State funded projects such as RTP would no longer be decided in Putrajaya.
Therefore, we pray that the issue of slow RTP and other State funded projects implementation especially involving schools as expressed by Members for Meradong, Krian, and Daro would be a thing of the past. Some of the issues related to this matter has been dealt with at length during the Oral Q&A. I thank the Honourable Member for Kota Sentosa for the Question.
Tuan Speaker, in response to the suggestions made by the Honourable Member for Padungan on providing 10 International Schools, as much as we would like to have many more State-owned International Schools, we must be realistic in our approach in establishing the schools. While we want to offer as many opportunities to as many deserving students as possible, we must also address the need for teachers who are trained and qualified in the Cambridge curriculum.
As it is, we are consistently building the competency of our teachers in the curriculum so as to be able to meet the needs of the International Schools. We will put in place plans to provide for more International Schools as the conditions permit in the future. In addition to the State-owned International Schools, Maktab Rendah Sains MARA or MRSM Kuching also runs the Cambridge syllabus.
Tuan Speaker, regarding the initiative to provide free tuition for secondary school students, laptops, and books for tertiary students, I wish to thank the Honourable Members for Tebedu, Tupong and Lingga for their support and input on implementation of this initiative. In this regard, my Ministry will be working closely with Yayasan Sarawak to ensure that the initiatives are executed effectively and efficiently to achieve the desired outcome.
I wish to thank the Honourable Member for Satok for his valuable suggestions in relation to Talent Development for Digital Innovation and the Start-Ups Ecosystem. The Sarawak Digital Economy Corporation (SDEC) implements a flagship accelerator programme known as the Digital Village Accelerator program or DiVA, which facilitates market expansion for Sarawakian owned companies, and provides financial support to start-ups that meet requirements under the programme. This DiVA is not a singer, it is just an acronym only. My Ministry will collaborate with SDEC to broaden its efforts in social entrepreneurship and digital innovation initiatives.
Tuan Speaker, before I proceed further on my Ministry’s achievement for the year, allow me to briefly delve into the proposed standard assessments for Primary 6 and Form 3. I thank the Honourable Members of this House for their support on the proposed standard assessments and the Federal Minister for Education for her support towards the initiative.
It is still premature to elaborate as we are still deliberating the exercise. Suffice to say that the assessment will focus on Dual Language Programme (DLP) subjects, namely Science, Mathematics and the English language. Such an assessment is vital as it will serve as a means to gauge the effectiveness of the DLP, alongside other initiatives which we have put in place to increase the uptake of STEM subjects in schools. The standard assessment is scheduled to commence in 2025, when our current DLP students attain Primary 6. I will enlighten members of this house from time to time on the progress. Be rest assured that the proposed assessment will not cause undue stress to all parties, students, teachers, the schools and parents.
Tuan Speaker, my Ministry is the enabler for Human Capital, Education, and Innovation under the PCDS 2030, and the budget allocated with a total of RM343 million will be effectively utilised to carry out strategic initiatives and projects to raise the quality of education, human capital development, as well as create a more robust R&D and innovation ecosystem in Sarawak.
In relation to this, I would now like to move on to my Ministry's achievements for the year 2023. We have had a fruitful year. We introduced our own signature STEM Trailblazers Sarawak to strengthen our effort in promoting the learning of Science, Technology, Engineering and Mathematics throughout the length and breadth of Sarawak. Organised simultaneously at two venues in Kuching and Miri, the programmes were able to attract a total of 6,000 participants comprising of Primary, Secondary, and Tertiary students, parents, educators and community leaders.
Through workshops, competitions, exhibitions and interactive sessions with subject matter experts, the programmes were able to ignite interest, innovative and critical thinking among the participants, manifested through the mini projects and exhibits by the students.
If I may, Tuan Speaker, one of the many innovative designs created by our students, through Raspberry Pi was a system to ensure cleanliness of toilets. Through sensor technology that could detect the unpleasant odour emitted, the janitor would be alerted to carry out the necessary cleaning works. The project by SJKC Kwang Chien, Sarikei is aptly known as the “Pi Toilet” but this pie you cannot eat. There were many more highly sophisticated, yet amusing projects by our children.
I wish to quote Dr Sue Sentance, Director of Raspberry Pi Computing Education Research Centre at the University of Cambridge in an article dated 15th August 2023. She said, “The creativity and quality of the projects on show was impressive given that all the students and many of their teachers had learned to program very recently and also had to be quite innovative where they hadn’t been able to access all the hardware they needed to build their creations”. She was kind enough to oblige our invitation during the STEM Trailblazers Sarawak.
This event reinforces my Ministry's dedication to nurturing a science literate society. Next year, my Ministry will extend this event to the central region with University of Technology Sarawak as the hub for the main event.
Tuan Speaker, the creativity of our students is nurtured by our ever-dedicated teachers. To ensure that our teachers are consistently kept abreast with the latest technological knowledge, my Ministry is continuously providing training to upskill the teachers. This year, 877 Reka Bentuk Teknologi or RBT teachers have completed their intermediary level for the Raspberry Pi computer training. Next year, these teachers will proceed to the advanced level.
Dr Dylan Wiliam, the foremost authority on formative assessment from the UK says, “Every teacher needs to improve, not because they are not good enough but because they can be even better”. Based on this premise, Sarawak Government through my Ministry provides funding for Continuous Professional Development (CPD) for our teachers.
Among others, this year, 606 teachers have been trained under the Teaching of Science and Mathematics in English programme, also known as DLP Sarawak, on top of the 5,200 who have been trained prior to this.
Additionally, 1,700 non-option Science, Mathematics and English teachers have also been trained under the CPD. Non-option teachers are those who were not specifically trained for these subjects during their teacher-training Degree.
We are very fortunate that the Singapore International Foundation (SIF) is collaborating with my Ministry, at their own cost, to implement the Maths PLUS which stands for Mathematics Pedagogical Learning, Understanding and Support. It is a four-year collaboration involving 50 primary schools with 100 teachers. These 100 teachers will in turn benefit about 13,000 students. I must put on record, our appreciation to SIF for their collaboration. Through all these initiatives, we are doing our part to improve the quality of education for our anak-anak Sarawak to ensure a brighter future for everyone.
On the international front, my Ministry through Sarawak Skills organised the 3rd BIMP-EAGA TVET Conference 2023. Themed “TVET to Drive Innovation and Talent Development”, and featuring sessions revolving around Innovation and Technology, Human Resource Management, Green TVET, and Strengthening Partnerships, the Conference reflected a well-rounded exploration of key aspects of TVET that are crucial for the development of the participating nations, namely Brunei, Indonesia, Malaysia and the Philippines.
Platforms such as the BIMP-EAGA play a crucial role in promoting collaboration, innovation, and the exchange of ideas in the field of education and talent, besides setting the groundwork for future joint initiatives, fostering mutual growth and development in the field of TVET.
My Ministry will be capitalising on this opportunity with MINTRED to promote our TVET institutions with our counterparts in the BIMP-EAGA region.
Tuan Speaker, I will now update Honourable Members of this august House on the activities and achievements carried out by the research agencies under my purview.
Over the past five years, the Sarawak Research and Development Council (SRDC) has provided research funding of up to RM15 million to the universities and research agencies in Sarawak through the SRDC Research Grant schemes.
We have seen some success stories from these ventures. To date, we have generated new knowledge through 38 publications arising from the projects funded. A biomedical innovation company based in Sibu has signed a licensing and technology transfer memorandum of understanding (MOU) with a Hong Kong-based company specialising in contraceptives.
Deputy Premier Professor Dr. Sim is looking at me. I don’t know what is so funny about that…(Laughter)… Anyway, he is supporting me, that’s it. Thank you.
In addition to the Research Grants, the Sarawak Government, through SRDC has established three subsidiaries - SMD Semiconductor; Sarawak Infectious Disease Centre (SIDC) and the Sarawak Science Centre to facilitate and provide for a vibrant and engaging research and science ecosystem.
The construction of the Sarawak Infectious Disease Centre is expected to take about 30 months to complete. The earth filling has been done actually. Now only the building part. With the completion of the Centre and laboratories, the research agreements by SIDC will come into execution, and the some of the ongoing research will be carried out in the Centre itself. We envision that the SIDC will one day be recognised as the Centre for Disease Control or CDC for the region.
Meanwhile, SMD Semiconductor, our home-grown semiconductor design company, has embarked on official collaborations with State-owned Training Institutions, Institutions of Higher Learning, and key players in the semiconductor industry.
This effort is geared towards developing human capital and cultivating local talent in the dynamic field of semiconductors and chip design. Again, I will stress this is not the potato chip. The initiative, aptly named “Sarawak Digital Economy Transformation: Talent Development in Semiconductors & Chip Design”, is strategically targeted at producing a cadre of 500 highly skilled semiconductor professionals in Integrated Circuit (IC) Design, IC Layout Design, Wafer Fabrication Process and Water Testing by the year 2030.
A key advantage of this talent development program is that local graduates will have the chance to secure high-value positions in the fields of semiconductors and Integrated Circuit (IC) Design. These efforts, along with SMD's service contract agreements with Melexis NV Belgium, and X-FAB Germany, underscores SMD's commitment to developing high-quality semiconductor solutions. In addition, SMD is also exploring partnerships with other semiconductor and microelectronic chip manufacturers and end-users.
Tuan Speaker, intellectual properties or IPs, often overlooked, are valuable intangible assets that play a crucial role in fostering innovation and in commercialisation. To-date, the Sarawak Biodiversity Centre or SBC has eleven Intellectual Properties published. These include five patents, two geographical indicators or Gl, three trademarks and one copyright. One such novel discovery involves a patent for a compound in treating neurodegenerative diseases which was granted in 2022 which has the potential to be used as a treatment for neurodegenerative diseases such as Parkinson's and Alzheimer's Diseases.
Successful R&D and commercialisation also requires joint efforts and a shared vision of both public and private sectors, and communities. I am happy to share with this august House that SBC has received RM20 million through collaborative projects from multinational companies and international funding bodies, related to algae, access and benefit sharing, and discovery of anti-viral compounds from natural products.
In 2023, our Tropical Peat Research Institute, TROPI achieved remarkable milestones by representing Malaysia in several international research collaborations. One of these collaborations is TROPI's participation in the Soil Biodiversity Observation Network or BON Research Project in partnership with the University of Leipzig, Germany. This global initiative aims to track and assess soil biodiversity over 10 years, with 90 countries involved. We are proud to be the only scientific agency in Malaysia to be invited to participate in this research collaboration.
In addition, TROPI has been invited to participate in the Living Lab for Wetland Forests or LiWeFor, this is not Chinese, project and the PeatlandN20 (in honour of my constituency N.20 Tarat) but actually Tuan Speaker, it is read as N 20 not N.20 meaning Nitrous Oxide. It is an international collaboration with the University of Tartu in Estonia, the University of Helsinki in Finland and the Karlsruhe Institute of Technology in Germany.
These projects are funded by the prestigious European Research Council (ERC) and aim to gain a comprehensive understanding of methane and nitrous oxide emissions from global peatlands, that is, between temperate and tropical peatlands.
These collaborations will not only advance our scientific research and body of knowledge on tropical peatland, but also add value in our implementation of sustainable development and management of peatlands.
Tuan Speaker, there is yet another achievement by TROPI which I would like to share with the Honourable Members of this august House today. TROPI's chemistry laboratory has been accredited to ISO 17025, a globally recognized international standard for testing and calibration laboratories.
This accreditation is a pivotal moment for TROPI as it opens the doors for further international research collaborations and strengthens our research capacity and competency on the global stage. This is also important to ensure that we have up-to-date research protocols as required under the Paris Agreement to address the challenges of climate change and peatland conservation. Establishing an ISO 17025 Accredited Chemistry Laboratory is essential to support the Sarawak Environmental Bill which has just been passed by this august House. Such a laboratory that meets international standards plays a crucial role in improving the verification and validation of carbon credits. This will also ensure that Sarawak's climate change efforts are based on sound science and reliable data to achieve our net zero carbon emissions by 2050.
Tuan Speaker, moving on to our next research body, CRAUN, not the king’s crown, CRAUN Research has developed for sago-based research. I am pleased that CRAUN has innovatively harnessed Al (Artificial Intelligence) to develop a technology that is capable of accurately identifying and enumerating mature sago palms.
This technological advancement holds significant potential in statistical applications, aiding in the precise determination of the sago palm population within a specific area. The application is also adept at discerning mature and harvestable sago palms. With this, CRAUN is poised to assist smallholders and sago manufacturers in effectively planning for ongoing sago production. Notably, this cutting-edge technology has undergone a patent application process.
Among many of its achievements, CRAUN has also successfully established a demonstration plant in Mukah for the recovery and treatment of waste generated from sago starch processing activities, yielding valuable biogas as a byproduct.
The generated biogas serves a multi-faceted purpose, providing electricity for the plant's operations, generating heat energy to dry waste sago bagasse fibre utilised as feedstock for animal feed, and more importantly, distributing refined cooking gas to nearby village households.
This initiative currently benefits a total of 145 households of Kampung Teh and Kampung Tabo in Mukah, enhancing the local communities’ access to clean and sustainable cooking gas.
Tuan Speaker, I will now highlight on the matter of interest on Institutions of Higher Learning and Technical Training Institutions under the purview of my Ministry.
All our State-owned universities namely, Curtin University, Swinburne University, University of Technology Sarawak and iCATS University College have seen significant increase in enrolment this past year. The increase in enrolment ranges from 60% to 300%. This is due to the introduction of affordable fee structure especially for deserving students. I must thank Yayasan Sarawak and the respective universities for the fee structure which has made the universities affordable to more students from different income background.
Despite the introduction of fee structure to local students, our universities remained attractive for international students. Currently, there are altogether 735 students from various countries, from Sweden, African Countries, South Asian Countries, China and neighbouring ASEAN Countries. My Ministry in collaboration with MINTRED will explore more opportunities to attract foreign students to our universities.
Tuan Speaker, research at State-owned Universities is growing from strength to strength. For example, Professor Patrick Then, Head of the School of Information and Communication Technologies at Swinburne University of Technology Sarawak Campus, has been awarded Fellow of the European Society of Cardiology (ESC) in October 2023. The prestigious honour is awarded to individuals who have made a significant contribution in the field of cardiology. Professor Then is a leading expert in health informatics and digital health research and development.
In line with the needs for skills training, Sarawak Skills is expanding its operations. The Sarawak Skills Sri Aman (SSSA) branch is currently in the final phase of development. It is expected to begin operations by the first quarter of 2024 and will have a capacity of 145 students, with hostels that can accommodate up to about 90 students. SSSA will offer Community-Driven Developments programmes, as well as courses in Electrical, Digital Skills, Smart Agriculture, Culinary Arts and Fashion Design. SSSA will also offer Sijil Kemahiran Malaysia (SKM) Programmes, namely Penyeliaan dan Operasi Penanaman Kelapa Sawit, Operasi Sistem Komputer and Pemasangan dan Penyelenggaraan Elektrik Fasa Satu. I envision that the establishment of SSSA will become a means to bridge the educational and economic gap of its local populace.
Tuan Speaker, World Skills Malaysia Sarawak (WMS) 2023 is a bi-annual state level skills competition jointly organised by my Ministry and the Department of Skills Development Sarawak Region. It is aimed at recognising youths or trainees from any TVET institution in Sarawak who possess excellent skills and have the potential to represent Sarawak in national-level skill competitions or even higher levels such as World Skills Malaysia Youth (WSMY), ASEAN Skills Competition (ASC), and World Skills Competition (WSC). The competition also aims to raise awareness and understanding among the public about the importance of skills and ultimately cultivating a culture of respecting skills-based job. The prequalification rounds of the competitions took place in October and the finals will be held in December in various skills areas, namely Automobile Technology, Electrical Installation, Mechanical Engineering CAD, Welding, Culinary Arts, Refrigeration and Air-condition, Web Technologies, Beauty Therapy, among others. I am proud to share here that in 2019, two Sarawakians represented Malaysia at the International WorldSkills Competition in Kazan, Russia. We hope to have more Sarawakians qualify for the International WorldSkills Competition in the future.
Tuan Speaker, it is also important to equip our local talents with relevant hands-on training to enable integration into the Green Energy industry. CENTEXS offers Certificate in Smart Solar Photovoltaic (PV), Certificate in Green Mobility and Storage, and Certificate in Green Hydrogen programmes in collaboration with Huawei and Solarvest.
CENTEXS has also been entrusted to extend its students intake to non-Sarawakians from West Malaysia, Sabah and Wilayah Persekutuan Labuan. During the Right Honourable Deputy Prime Minister, Dato’ Seri Dr Ahmad Zahid Hamidi, visit to CENTEXS on the 16th of September 2023, he announced a funding of RM30.0 million to CENTEXS for the purpose. We must thank the Right Honourable Deputy Prime Minister for the generous allocation. And CENTEXS will initiate the intake when the funds are made available by the first quarter of next year. This is a testimony for CENTEXS as a preferred TVET institution especially for renewable energy and digital technology.
Tuan Speaker, in working strategically towards achieving the goals outlined in the Post COVID Development Strategy 2030, my Ministry will undertake monitoring to ensure that all the projects that are implemented will be achieved the desired outcomes, as much as some of the programmes and projects are not directly implemented by the Ministry. Thus, we will widen our net of projects and programmes monitoring especially on education, innovation, and talent development. To the agencies implementing these projects, among them JKR, JPNS, Yayasan Sarawak, SDEC to name a few, who are not under my immediate purview, do not take offence when my officers request updates and information and at times conduct coordination and monitoring. We are here to work together to achieve the same outcomes and impacts in the long run.
Tuan Speaker, developing human capital through education is a long and arduous undertaking. This is so true that, may I quote a famous Chinese saying, and I quote “It takes 10 years to grow a tree, but a hundred years to cultivate people”. I’m not able to say in Chinese, in mandarin.
To conclude, I take this opportunity to thank the State Secretary of Sarawak, State Attorney General, State Financial Secretary, all Ministries; Departments and Agencies; both State and Federal, that have rendered their assistance to my Ministry to get things done. Not forgetting my deepest appreciation to all officers and staff of my own Ministry who have worked tirelessly to ensure that work runs smoothly.
Saya juga ingin merakamkan setinggi-tinggi penghargaan dan tahniah kepada Tuan Speaker, Timbalan Speaker serta pegawai-pegawai dan petugas Dewan Undangan Negeri yang telah mengendalikan Persidangan ini dengan efisien.
Saya mengambil kesempatan ini mengucapkan a very merry and Blessed Christmas kepada yang menyambut, serta Selamat Tahun Baru, a very Happy New Year 2024, and a Happy Chinese New Year, Gong Xi Fa Chai. Thank you.
With respect, I invite the Honourable Dato Sri Haji Julaihi bin Haji Narawi, Minister of Utilities and Telecommunications, to deliver the winding-up speech.
Thank you, Mr Speaker. I would also like to take this opportunity to extend my warmest congratulations to Mr Speaker on being re-appointed as Speaker of this esteemed State Legislative Assembly, and we believe that Mr Speaker's experience is extremely useful in guiding and conducting every sitting of the State Legislative Assembly after being re-appointed. So with that, I believe that such ability and experience are very meaningful indeed. Thank you also for allowing me to deliver the winding-up speech for the Ministry of Utilities and Telecommunications of Sarawak.
In conjunction with the budget meeting this time, I would like to extend my highest congratulations and well done to the Honourable Premier of Sarawak, who tabled the 2024 Budget with a focus on comprehensive development and narrowing the gap between urban and rural areas in an effort to drive the prosperity of Sarawak. This is evidenced by the budget allocation for 2024 of RM13.6 billion compared with RM11.5 billion for 2023, and this marks yet another of the largest budget allocations in Sarawak's history.
My Ministry extends its heartfelt thanks for the budget allocation of RM1.03 billion to implement various water and electricity supply projects in Sarawak.
I would also like to express my gratitude to the Honourable Members who took part in raising questions and suggestions on issues under my Ministry's responsibility. All suggestions that have been raised will be taken into consideration for appropriate action.
We are very proud, Mr Speaker, of the leadership of the Honourable Premier of Sarawak, who has brought glory to Sarawak in the eyes of the world. This can be proven by the recognition from foreign countries, where he is frequently invited to share knowledge and experience in the renewable energy sector in Sarawak. Recently, he was given the honour of delivering the keynote address at the Bali International Hydropower Conference on 31 October 2023. In that conference, he emphasised that Sarawak has the potential to become a major supplier of renewable energy in this region, in line with Sarawak's aspiration to become an energy hub in the Southeast Asian region by 2030. I am grateful and happy to be in the delegation of the Honourable Premier of Sarawak to witness and listen to the Honourable speaking and to see for myself the reactions of the participants at that conference. Congratulations and well done once again to the Honourable Premier of Sarawak.
Congratulations are also extended to the Honourable Premier of Sarawak for being awarded the title of "Felo Kehormat" or "Honorary Distinguished Fellow" at the 41st ASEAN Federation of Engineering Organisations Conference (CAFEO-41) on 22 November 2023, recently.
Mr Speaker, under the leadership of the Honourable Premier of Sarawak, we have also created history and once again placed Sarawak on the world map. This can be proven when Sarawak, representing Malaysia, was selected for the first time to host the International World Water Congress and Exhibition in 2028, organised by the International Water Association, or IWA for short. This is the first time such an event has been held in Southeast Asia. So this is an achievement for Sarawak and for Malaysia as a whole. This conference is expected to be attended by more than 10,000 participants from 80 countries.
In addition, Kuching was also selected to host the World Congress on Innovation and Technology (WCIT) from 4 to 6 October 2023. This conference was also held concurrently with the sixth series of the annual event, the International Digital Economy Conference Sarawak (IDECS) 2023. This conference successfully attracted the participation of 10,123 participants from within and outside the country. In fact, the Honourable Premier also received the World Innovation, Technology, and Services Alliance (WITSA) Special Award named the Eminent Person Award from the Chairman of WITSA, Dr. Sean Seah. WITSA is the organiser of the WCIT.
Sarawak has also received the Digital Government Awards from the ASIAN-Oceanian Computing Industry Organisation (ASOCIO) 2023 in Seoul, South Korea on 14 November 2023, which was last week. This is a great recognition for Sarawak as it has been recognised by an organisation involved in the information and communication technology (ICT) industry, particularly in the Asia-Oceania region. I was entrusted to represent the Sarawak Government in receiving the award.
At this opportunity, I would also like to extend my highest congratulations to the Honourable Member for Jepak, namely Yang Berhormat Tuan Haji Iskandar Turkee, the candidate of the Gabungan Parti Sarawak (GPS), for winning the N.67 DUN Jepak by-election with a large majority recently. This victory is proof of the people's confidence and trust in the policies and development agenda of the GPS government under the leadership of the Honourable Premier of Sarawak.
Mr Speaker, in line with the Post COVID-19 Development Strategy 2030 (PCDS 2030), the Sarawak Government will continue to be committed to providing utility and telecommunications infrastructure, especially in rural areas. The Sarawak Government has allocated funds amounting to RM12.9 billion for the implementation of utility and telecommunications projects since 2018.
To reduce the financial burden on the people, especially the low-income group, various initiatives have been implemented by the Sarawak Government through my Ministry, including the Free Water Programme, Connection Charges Government Financial Assistance (CCGFA), and the Pakej Bantuan Khas Sarawakku Sayang (BKSS) special assistance package, which has so far cost a total of RM1.646 billion.
Water Supply
Mr Speaker, now I would like to touch on the latest developments regarding water supply development in Sarawak.
My Ministry is and will continue to strive to provide water supply facilities so that the people throughout every corner of Sarawak can enjoy clean, treated, safe and sufficient water supply. As of the third quarter of 2023, the overall water supply coverage across Sarawak is 84.2% and coverage in rural areas is at 68.2%. Based on the Sarawak Water Supply and Water Grid Master Plan, the latest funds required to implement all water supply projects to meet long-term water supply demand are estimated at RM20 billion.
Water Supply Grid Programme for Stressed Areas
For the information of this august House, the Sarawak Government is still continuing the implementation of the Water Supply Grid Programme for Stressed Areas, which received an allocation totalling RM4 billion under the Alternative Funding allocation. Under this programme, a total of 304 projects, compared with the 298 projects reported at the previous meeting, are being implemented, and their status is as follows:
(a) 237 projects have been completed, equivalent to 78%; (b) 61 projects are under construction, equivalent to 20%; and (c) 6 projects are still in planning, equivalent to 2%.
The projects completed under this programme, as reported at the previous meeting, have managed to solve the problems of water stress and supply, particularly in rural areas such as Asajaya, Sadong Jaya, Sebangan, Sebuyau, Eco Garden in DUN Dudong, Kuala Balingian, Balingian, Ulu Bayan, Pekan Sebauh, Pekan Tatau, Beluru, part of Marudi, Pekan Lawas, and 14 packages of the Sarawak Alternative Water Supply, or SAWAS for short.
Meanwhile, the newly completed water supply projects are in the areas of Bau, Pekan Serian, Simanggang, part of Sibu Jaya also within the DUN Dudong area, Kuala Serupai, Kuala Matu, part of Belaga-Mejawah, Belawai, Tanjung Manis, Pekan Sarikei, Pakan, part of the Limbang District, and two packages of SAWAS. All these areas have enjoyed a stable water supply. The explanation on the completed projects proves that the Sarawak Government is overcoming this problem in stages.
For the information of the Honourable Members of this august House, I would like to inform you about the latest developments of the Tanjung Manis Water Supply, which has been stalled for a long time. The Tanjung Manis Water Supply Project successfully supplied water to Tanjung Manis and its surrounding areas on 2 October 2023. This means the Tanjung Manis Water Supply Project has been completed and has started operating. This project covers eight packages and is capable of supplying raw water of up to 50 million litres per day (JLH). A total of 30 million litres per day (JLH) of raw water is for the needs of the Tanjung Manis Water Treatment Plant, namely at Package 6. Meanwhile, the remaining 20 million litres per day (JLH) of raw water is to meet the industries in Tanjung Manis.
Among the areas that benefit from the completion of the treated water supply project from the Tanjung Manis Water Treatment Plant are Pekan Tanjung Manis, Belawai, Jerijeh, Rejang, Serdeng and Tanjung Manis Airport.
Apart from that, the Tanjung Manis Water Treatment Plant will also upgrade the treated water supply system on Pulau Bruit after the completion of the "Proposed Water Supply to Pulau Bruit, Mukah Division" project. This project covers the construction of a 62 km pipeline, two booster pumping stations and four high-level water tanks with a total capacity of 6.1 million litres. The locations of the four high-level tanks are in Semop, Saai, Penibong and Penipah. So far, the progress of the "Proposed Water Supply to Pulau Bruit" is at 82.36% and is expected to be completed in the second quarter of 2024.
Mr Speaker,
Implementation of Water Supply Projects under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMKe-12)
Under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMKe-12), the Sarawak Government has approved an allocation totalling RM591.2 million for the implementation of 101 water supply projects, comprising 37 connection projects and 64 new projects. The approval of this allocation is a manifestation of the Sarawak Government's efforts to expand coverage and improve water supply facilities throughout Sarawak.
Among the critical projects to be implemented is the upgrading of Plant No. 4 at the Batu Kitang Water Treatment Plant. The tender advertisement has been issued and will close on 27 December 2023. New water supply systems in Landeh (Kuching) and Mukah, new or upgraded water treatment plants in Engkilili (Sri Aman), Kaki Wong (Saratok), Salim and Kanowit (Sibu), Song and Kapit, Beluru (Miri), Lawas and the Nyabau raw water source system (Bintulu). The implementation of these projects is to ensure that we have sufficient reserve margin or water at a minimum rate of 20% of the water treatment plant capacity.
Mr Speaker,
Non-Revenue Water (NRW)
One of the main issues affecting water supply in Sarawak is the high level of Non-Revenue Water (NRW). Non-Revenue Water is water lost during distribution to consumers, which is caused, among others, by pipe leakage, water theft and malfunctioning water meters. As of the third quarter of 2023, the average NRW for the whole of Sarawak is high at 43%. There is a slight decrease compared with last year. So, at least there is an improvement here, Mr Speaker. For the information of the Honourable Members of this august House, a total of 2,742 km of old and dilapidated water pipes of various sizes are still being used in the water supply distribution system throughout Sarawak. This is among the main causes of the high NRW rate because these old pipes easily burst, causing low water pressure or supply interruptions, which lead to water supply disruption.
Therefore, to address this problem, the Sarawak Government has approved the implementation of a programme to upgrade and replace the old water pipes in phases throughout Sarawak starting in 2024. This involves an estimated allocation of RM1.085 billion. So, I hope this will solve our leakage problem and NRW in the long term and I hope also my colleagues in this august House will be patient because we will start doing the upgrading and replacement of all the old pipes that is still being used in the system starting from next year. So, we will try our best to upgrade and replace the old pipes which is still being used right now.
Protection and Conservation of Water Sources
Mr Speaker, to ensure the sustainability of raw water source supply for the long term in Sarawak, my Ministry is taking steps to gazette 38 water catchment areas in addition to the 28 water catchment areas that have been gazetted. This is to ensure the security of raw water sources in line with the Sarawak Water Supply and Water Grid Master Plan.
Surcharge on Excessive Water Use
For the information of this august House, the current total water demand in Sarawak is approximately 2,000 million litres per day (JLH), and the projected water demand in 2030 is estimated to increase to 2,400 million litres per day (JLH).
According to the United Nations, the recommended water consumption for one person is 165 litres per day, equivalent to 19,800 litres per household per month.
In Sarawak, water consumption for the domestic category averages 224 litres per person per day, equivalent to 26,880 litres per household per month. Therefore, my Ministry, through the relevant water agencies, will implement a surcharge on domestic water use exceeding 35,000 litres per household per month. This means that if water use is up to 35,000 litres per household per month and below, no surcharge will be imposed. Unless you use more than 35,000 MLD then you will be charged. This is important to encourage and guide residents, especially households, to use our water prudently.
As we are well aware, the climate change phenomenon currently taking place may affect the security of our water sources. Therefore, all parties, including us who are in this august House, are urged to together use water prudently without wastage. This is to ensure "Water forever, whatever the weather".
Establishment of One Entity and State Water Authority as a Body Corporate
Mr Speaker, to ensure that the regulation and supply of water in Sarawak is more efficient and sustainable, the Ministry has taken steps to restructure this sector and is studying the proposal to integrate four water supply agencies by establishing a single water supply entity to be regulated by a body corporate that will be tailored to the needs and laws of Sarawak.
The detailed study for the establishment of One Entity and State Water Authority as a Body Corporate is now at the final stage of study.
I would like to emphasise in this august House that the establishment of this single entity will take into account every aspect, including the welfare of all staff of the water supply agencies in Sarawak, and this restructuring will not affect the existing water supply operations to consumers.
Electricity Supply
Mr Speaker, now I turn to the development of electricity supply in Sarawak.
Electricity Supply Capacity of Sarawak
For the information of this august House, the available generation capacity at present is estimated at 5,745 Megawatts (MW). This amount is sufficient to meet current demand of 4,584 Megawatts (MW).
Of this current demand, 39% (1,769 Megawatts (MW)) comes from domestic, commercial and industrial consumers. The remaining 61% (2,815 Megawatts (MW)) comes from the following uses:
(a) consumers under Power Purchase Agreements (PPA), namely energy-intensive industries at Taman Perindustrian Samalaju Bintulu (Samalaju Industrial Park); and (b) energy exported under the Power Exchange Agreement (PEA) to West Kalimantan through the Bengkayang Connection Point.
In terms of the generation capacity mix, hydropower generation accounts for 60%. The rest consists of 22% from gas, 17% from coal and 1% from diesel.
Mr Speaker, I wish to stress that it is important that the generation capacity mix is not limited to a single generation source. This is to ensure the stability of electricity supply in Sarawak should there be a constraint on one of the sources in the generation mix.
If we relied entirely on hydropower, it would expose us to the risk of a shortfall in generation capacity, especially during the dry season. Therefore, energy generation using thermal fuels (fossil fuel) such as natural gas, coal and diesel still needs to be maintained to ensure sufficient energy supply (energy security). That means, we have to take into consideration our energy security in the future. So, that is why we emphasise the generation capacity mix this year.
Using natural gas for electricity generation is comparatively cleaner than other thermal fuels (fossil fuel) such as coal and diesel. Referring to the Sarawak Energy Annual Sustainability 2021, the carbon emission intensity of natural gas is 0.54 tonnes CO2 per Megawatt Hour (MWh), compared with coal at 1.13 tonnes CO2 per Megawatt Hour (MWh). This shows that electricity generated from natural gas releases 52% less carbon compared with coal. This also means that natural gas is cleaner than other thermal fuels, namely coal and diesel.
Based on the facts I have just stated, it is inaccurate to say that energy produced from natural gas is a less clean energy source. What matters is that we use energy from a generation mix that is largely from renewable energy.
Mr Speaker,
Electricity Demand Projection
Projected electricity demand from domestic, commercial and industrial consumers is expected to rise to 6,600 Megawatts (MW) by 2030. Of this total, 2,221 Megawatts (34%) is demand from domestic consumers, while the remaining 4,379 Megawatts (66%) is demand from consumers under the Power Purchase Agreement (PPA) and Power Exchange Agreement (PEA).
Several new power generation and transmission line projects are being and will be implemented to meet this increase in demand. These include the construction of the Baleh Hydro Dam, which is expected to raise total generation to 8,290 Megawatts (MW) once it begins full operation in 2030.
For the information of this august House, the transmission line connection to the Main Grid from Miri to Lawas District (Northern Grid Extension) is expected to be completed in 2024, and Limbang District in 2025.
Mr Speaker, this increase in demand also involves the southern areas, especially Kuching and Samarahan, particularly to meet demand at Taman Industri Samajaya. To meet this increase, Sarawak Energy has completed four projects as follows:
(a) Mambong Electricity Substation; (b) Tondong Electricity Substation; (c) Matang Electricity Substation; and (d) Entinggan A Electricity Substation.
So, these four projects have already been completed. Meanwhile, approved projects waiting to be implemented starting next year are:
(a) Construction of Entinggan B Electricity Substation; (b) Construction of Tanjung Bako Electricity Substation; and (c) the transmission line between Entinggan B Electricity Substation and Tanjung Bako Electricity Substation that I mentioned just now will commence in January 2024 and is expected to be completed and operational in March 2026.
Apart from that, Mr Speaker, the following projects are also planned to complete the Kuching Outer Ring (KORN), subject to demand when necessary. So, what we are still planning is:
(a) Demak Laut Electricity Substation; and (b) Santubong Electricity Substation.
So, these two projects are planned and may be considered for implementation should demand continue to rise. So, that means we have standby two projects that will be implemented when and as the demand is increasing.
Mr Speaker,
Electricity Exports
Since 2016, Sarawak has exported electricity to West Kalimantan with a nominated peak capacity of up to 230 Megawatts (MW) under the regional cooperation initiative BIMP-EAGA. In addition, a power sales agreement with Sabah Electricity Sdn. Bhd (SESB) was signed in August 2021 to supply 30 Megawatts (MW) of electricity to Sabah.
Sarawak is expected to export up to 1,000 Megawatts (capping 1,000 Megawatts) of electricity to Singapore by 2032. This project has already been agreed between the Government of Malaysia and the Government of Singapore. The project involves the installation of a submarine cable estimated at 720 km long from Tondong, Sarawak, directly to Changi, Singapore. The submarine cable interconnection will pass through the Muri-Midai Corridor, Indonesia.
The agreement relating to the Muri-Midai corridor was signed by Malaysia and Indonesia in 1983.
It is estimated that 80% of the cable will traverse the Muri-Midai Corridor, Indonesia, while the remaining 20% will pass through Malaysian and Singaporean waters. The cable project will be underwritten by Singapore (to be underwritten by Singapore) by the Singapore side.
Mr Speaker, for the information of this august House, the amount of electricity exported at present is only 2% on average of 5,745 megawatts (MW). Taking into account exports to Sabah and Singapore, by 2032 this percentage will rise on average to 12%, namely 1,130 megawatts of the estimated generation capacity of 9,529 megawatts.
This means that by 2032, based on projections, we will still have sufficient electricity of 8,399 megawatts (88%) for local use and needs in Sarawak, including a reserve margin within the range of 22% to 25%.
With these surplus electricity exports, Sarawak has the opportunity to increase revenue to strengthen development efforts, including utility infrastructure, in line with the aspiration of a developed Sarawak by 2030 and making Sarawak a renewable energy hub in the ASEAN region. In line with PCDS 2030, the target is for a total of 15% of Sarawak's electricity sector revenue to be obtained from the international market through renewable energy.
Rural Electricity Supply (BELB)
Mr Speaker, I am pleased to state in this august House that efforts to supply electricity, particularly to rural areas of Sarawak, are being carried out with greater vigour to achieve full coverage target through the implementing agency, Sarawak Energy. The Sarawak Government has allocated RM2.37 billion through Alternative Funding to implement a total of 210 rural electricity supply projects. Up to now, the data is as follows:
(a) 130 projects have been completed; (b) 60 projects are being implemented and are expected to be completed in stages by 2025; and (c) 20 projects will be implemented early in 2024.
That means, we are still doing the implementation of rural electricity supply in stages. So, I hope my colleague in this august House will be patient enough to see the progress from time to time.
Once fully completed, these projects will benefit a total of 29,500 households in rural areas.
Mr Speaker, under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMKe-12), the Sarawak Government has also approved an allocation totalling RM50.5 million for the implementation of three new electricity supply projects as follows:
(a) connection of electricity supply from the Main Grid System to the off-grid Sarawak Alternative Rural Electrification Scheme (SARES) system; (b) scheduled replacement of key components of the SARES system, including batteries nearing the end of their lifespan; and (c) preliminary study for the construction of a 33 kV substation at Pekan Tunoh and installation of a 33 kW Medium Voltage Covered Conductor (MVCC) line from Gaat to Tunoh.
In an effort to overcome the frequent interruptions of electricity supply, my Ministry, through Sarawak Energy, has and is improving the performance of lines in rural areas by taking the following actions:
(a) regular maintenance of overhead lines; (b) regular trimming of tree branches and twigs at every electricity pole; (c) installation of an intelligent monitoring system known as the Line Fault Indicator (LFI). This system will speed up the detection of faults on overhead lines; (d) adding or upgrading transformer capacity to a higher capacity; and (e) construction of new substations in areas that need them.
So, we will take this action accordingly and these are among the feedback that we have received from the various areas including from our Members in this august House. So, kita akan mengambil tindakan yang sewajarnya; seperti yang saya maksudkan tadi.
Additional and Late Applicant Fund (ALAF)
Mr Speaker, for the information of this august House, a total of 21,073 households have been approved; let me repeat, for the information of this august House, a total of 21,073 households have been approved to be covered by ALAF projects across Sarawak. Of this total, 14,649 households have been completed and 5,126 households are at various stages of implementation. Meanwhile, 1,298 households are still at the survey and design stage and will be implemented based on queue order and the availability of complete information obtained from all relevant applicants.
Electricity Ordinance (Chapter 50)
Mr Speaker, the amendment to the Electricity Ordinance (Chapter 50) was tabled in this august House last Tuesday. With the passing of this amendment, the development of the renewable energy sector in Sarawak will be able to be developed more vigorously. This is in line with our intention to develop hydro and solar energy to encourage participation in the Net Energy Metering (NEM) scheme. The role of Sarawak Energy as the "single buyer" has also been established as the single entity to facilitate the development of the renewable energy sector in Sarawak.
Cascading Dam (Empangan Melata)
With the passing of the Electricity (Amendment) Bill, 2023 last Tuesday, this opens up opportunities for us to develop our hydropower potential through cascading dams. Cascading dams are our new approach to develop our hydropower potential, because it does not require large reservoir or inundate large area of land but rely on water flow. This new approach can be more sustainable, minimising environmental and social impacts.
The passing of this Bill also provides opportunities for private, public, and local communities to participate through equity in the development of hydropower with Sarawak Energy if the local community wants the hydro project to be developed in their area. Again, the local participation in developing the cascading dams depend on their willingness without force. Nevertheless, Sarawak Energy will continue to take the lead to ensure grid stability, safety and security.
Sarawak Energy adopts International Hydropower Sustainability Standards in carrying out its projects in line with Environmental, Social and Governance (ESG) policies. The communities and local leaders will be engaged early in the project implementation. Hopefully, there will be no interference by outsiders influencing the local community in the area.
Mr Speaker, Sarawak Energy is currently carrying out feasibility study to develop Trusan Hydroelectric project and looking at cascading dams as a possibility choice. All key stakeholders will be engaged including local representatives, leaders and local communities in the area. We have yet to make any decision to proceed with Trusan or Baram dams at this stage.
There is a Strategic Collaboration Agreement signed between Sarawak Energy and Gentari Sdn. Bhd. (a subsidiary of PETRONAS) on 27th June 2023. The agreement is to explore opportunities to collaborate in developing and deploying clean energy solutions in Sarawak. Therefore, the report raised by the Honourable Member for Ba’Kelalan on Petroliam Nasional Berhad (PETRONAS), Cahaya Mata Sarawak Bhd. and Gamuda Bhd. as strong contenders for construction of Trusan and Baram dams is not accurate. For the record, I would like to reiterate here, there has been no final decision made as yet on Trusan and Baram dams.
Mr Speaker, the Sarawak Government's intention to supply electricity to the Lawas area through connection to the Sarawak Grid will become a reality, once the 275 kV transmission line project from Medamit to Lawas is completed by Sarawak Energy in 2024 under the Northern Grid Extension programme. With the completion of this project, the problem of electricity supply disruption in Lawas is expected to be overcome.
Meanwhile, for rural electricity supply, my Ministry, through Sarawak Energy as the implementing agency, has taken the following actions to expedite the implementation of ALAF projects, among them:
(a) Increasing the number of contractors, consultants and competent persons in electrical works; and (b) providing larger contract packages to benefit from economies of scale. So, we would like to encourage the participation of contractors so that it is viable for them to participate.
Gas Distribution
Mr Speaker, next, I will touch on the Gas Distribution.
Initiative for Gas Utilisation in Sarawak
My Ministry, through PETROS, will carry out continuous efforts to increase gas utilisation in Sarawak in line with the Sarawak Gas Roadmap through several major projects.
My Ministry through PETROS will implement the Bintulu-Samalaju Gas Pipeline project and the project to build a 400 megawatt (MW) Combined Cycle Gas Turbine (CCGT) power station in Miri. These projects are expected to commence next year, that is 2024. Apart from Miri, the construction of the CCGT in Samalaju will be carried out by Sarawak Energy.
This initiative is a wise move by the Sarawak State Government in its efforts to transition the energy shift from the use of coal or diesel to gas, because energy sourced from gas is comparatively cleaner (cleaner) than energy sourced from coal and diesel. At the same time, the focus of the Sarawak State Government is to generate electricity based on hydro resources through the method of cascading dams (empangan melata) during the transition stage of energy, which is indeed the right step.
PETROS will also implement the pioneer project Sarawak Virtual Pipeline System (VPS), in which Liquefied Natural Gas (LNG) will be delivered from Bintulu to the city of Kuching. This project is still at the commercial negotiation stage and is expected to be finalised in the first quarter of 2024.
PETROSNiaga Subsidised Liquefied Petroleum Gas (LPG) Distributor in Sarawak
Mr Speaker, this Ministry has made commercial arrangements to regulate and enforce the distribution of subsidised LPG gas more effectively and efficiently in Sarawak. PETROSNiaga, which is a subsidiary of PETROS owned by the Sarawak State Government, will become the sole distributor for the subsidised LPG market involving more than 700,000 gas cylinders throughout Sarawak starting 1 December 2023.
The Sarawak Ministry of Utilities and Telecommunications has made an important decision regarding the distribution of subsidised LPG gas in Sarawak. At present, there are two subsidised LPG supply companies, namely PETROSNiaga, which controls 68% of the market throughout Sarawak, while 32% is controlled by Syarikat MYGAZ Sdn. Bhd.
PETROSNiaga is a local company, 51% of whose equity is owned by PETROS and 49% by PETRONAS Dagangan Berhad. This means both companies are Malaysian Based Company. Meanwhile, MYGAZ Sdn. Bhd. is a subsidiary of SIAM Gas, which is a Liquefied Petroleum Gas (LPG) supplier company from the country of Thailand.
After careful consideration regarding MYGAZ Sdn. Bhd., my Ministry has decided that the subsidised LPG licence for MYGAZ Sdn. Bhd., which expires on 30 November 2023, will not be renewed. What this means is, it is not true to say that we terminate the license because the license will expire on the 30th November 2023. I am surprised why the Honourable Member for Padungan is so keen to support MYGAZ Sdn. Bhd., why? You should be supporting our very own Malaysian company. Besides, I am also surprised that he says we terminated it, no, no question of us cancelling the licence. Because we are not renewing, these are two different situations. So, I hope Honourable Member for Padungan, you are not here again, you are always absent. So, I hope you will be around to listen to our winding up.
This means, Mr Speaker, MYGAZ Sdn. Bhd. is no longer permitted to carry on the business of subsidised LPG starting 1 December 2023. The Sarawak State Government thanks MYGAZ Sdn. Bhd., which has been the supplier of subsidised LPG gas since taking over from SHELL starting in 2013, that is, for 10 years. What this means is, MYGAZ also took over from SHELL in 2013.
However, Mr Speaker, the non-subsidised LPG licence for MYGAZ Sdn. Bhd. remains valid until 29 June 2024. This means MYGAZ Sdn. Bhd. is still carrying on the non-subsidised LPG business in Sarawak. Meaning that, MyGaz is still doing LPG Trading for the non-subsidy LPG in Sarawak. So, what is the problem with our Honourable Member for Padungan? You should be realising this...(Interruption)… I do not know, that is that.
Mr Speaker, now the time has come for Malaysia's own local company, based in Sarawak, namely PETROSNiaga, to be appointed as the distributor of subsidised LPG gas in Sarawak starting 1 December 2023. Let us not allow our local company, "kita tengok sahaja" (we just watch), foreign companies doing business in Sarawak until "pelik-pelik jak mata kita empun nangga"…(Interruption)…right?
My Ministry is confident that PETROSNiaga, with a strength of 65 dealers and 280 sub-dealers, will provide employment opportunities to thousands of Sarawakians. A total of 16 dealers who were previously under the wing of MYGAZ Sdn. Bhd. can at any time switch to PETROSNiaga to obtain subsidised LPG gas supplies.
Meaning that, the 16 dealers under the wing of MYGAZ Sdn. Bhd. can always revert to PETROSNiaga anytime from now or from the 1st December. With this, there is no issue of job losses as alleged by the parties concerned, which also happened when MYGAZ Sdn. Bhd. took over operations from SHELL in 2013. What this means is, the situation is the same. So, I am just a little surprised, Mr Speaker, that the Honourable Member for Padungan says we need an enforcement force with a strength of 3,000 personnel. This is what was mentioned by the Honourable Member for Padungan. At the same time, MyGaz Sdn. Bhd. also says 3,000 people will lose their jobs. So, both use the figure 3,000. I do not know what the co-relation between the two is. It is up to you to guess. "Apa kenak duak-duak makei angka 3,000 ya?" I do not know, only the Honourable Member for Padungan himself knows very well…(Interruption)…
My Ministry believes that PETROSNiaga's capability to ensure that the supply of subsidised LPG gas is adequate, and able to provide a high standard of service, and at the same time contribute to the economic well-being of Sarawak.
Distribution of Gas Ordinance (Chapter 72)
As we are well aware, the amendment to the Distribution of Gas (Amendment) Ordinance (Chapter 72) was tabled and passed by this august House on 21 November last. This amendment enables the Sarawak State Government to appoint a Gas Aggregator to manage the procurement of natural gas from various sources and distribute it optimally to consumers, investors and industry players in Sarawak.
For this purpose, my Ministry through PETROS will continue to strive to increase gas utilisation in Sarawak to at least the level of 30% in line with the Sarawak Gas Roadmap. And we believe that, among the matters we can give attention to in targeting gas utilisation of up to 30% is to encourage the growth of downstream industries or industri hiliran based on gas utilisation in the future. Meaning that, that will provide job opportunities for Sarawakians in the near future; besides that, it will also increase our revenue from gas-based industries in Sarawak. So, this means we can multiply gas utilisation among industry players in Sarawak. This is our target, so we hope it will be realised by all parties including the Honourable Member for Padungan. Telecommunications, Mr Speaker, next I will convey the developments and…(Interruption)…
Honourable Member, Honourable Minister, we have a short break. Sitting resumes at 11.40 a.m.
(The sitting was suspended at 11.10 a.m.)
(The sitting resumed at 11.48 a.m.)
[Mr Speaker in the Chair]
The Honourable Dato Sri Haji Julaihi bin Haji Narawi, Minister of Utilities and Telecommunications, to deliver the winding-up speech.
Thank you, Mr Speaker, for allowing me to proceed with the next winding-up speech and perhaps a short break is sufficient for us to take a short rest. Perhaps some Members need to rest for a while. Nevertheless, thank you.
TELECOMMUNICATIONS
Next, I will present the developments and progress of telecommunications in Sarawak.
Telecommunications Coverage in Sarawak
The Sarawak State Government, through the Sarawak Linking Urban, Rural and Nation (SALURAN) initiative, and the Federal Government, through the National Digital Network Plan (JENDELA) initiative, will continue efforts to expand and improve telecommunications coverage in Sarawak, particularly in rural areas.
As informed in the previous State Legislative Assembly sitting, it is estimated that a total of 7,000 telecommunication towers are needed to achieve full coverage of populated areas by 2030. To date, a total of 4,217 telecommunication towers, equivalent to 60.2%, have been operational, compared with 3,708 telecommunication towers, equivalent to 52.9%, as informed at the previous sitting. Internet service coverage in residential areas in Sarawak to date stands at 76.3%. Meaning, that the number of telecommunication towers we have built to date has increased as compared to the previous sitting. So, this is a good progress, Mr Speaker. Hopefully this will be able to assist us to achieve a better coverage especially in the rural areas.
Joint Sarawak and Federal Government Partnership for the Operation of SMART Towers in Rural Areas
Mr Speaker, the Sarawak State Government has implemented an intervention programme to accelerate efforts to expand telecommunications service coverage in rural areas of Sarawak through the SALURAN initiative, with an allocation of RM1.89 billion. Among the projects implemented under this SALURAN initiative is the construction of 600 new telecommunication towers in rural areas, known as the Sarawak Multimedia Authority Rural Telecommunication (SMART) project. SMART is one component of the intervention programme carried out by the Sarawak State Government. So, I hope this will be understood well by all Honourable Members. For the information of the Honourable Members of this august House, mobile service providers are less interested in providing their services at SMART towers because of limited commercial returns. As an intervention measure, the Sarawak State Government has held several engagement sessions, negotiation and discussion, with the Federal Government, particularly the Ministry of Communications and Digital (KKD), to ensure that all SMART towers can be operational.
As a result of these engagement sessions, the Federal Government, together with the main mobile service providers, has reached an agreement to share the operating costs of the SMART towers, which are estimated at RM207 million. These operating costs, amounting to RM207 million, are for a period of three years from 2024 until 2026. After this period ends, the main mobile service providers will fully bear the operating costs of all these towers. Thus, this is where there is progress in our discussions with the Federal Government, because the cost of operating all the SMART towers requires expenditure. Therefore, we extend our many thanks to the Federal Government, particularly the Ministry of Communications and Digital, for agreeing to approve the allocation, because we have built the towers as required.
Implementation of 5G Technology
The Federal Government, through Digital Nasional Berhad (DNB), has provided an allocation of RM1 billion for the implementation of 5G in Sarawak for the period from 2022 to 2030. A total of 589 5G sites are scheduled to be operational throughout Sarawak by 2024 as targeted. This will contribute to 60% 5G Coverage of Populated Areas (COPA) in Sarawak.
Digital Community Centres (DCC) and Digital Economy Centres (PEDi)
Mr Speaker, a total of 45 Digital Community Centres (DCC) operated by the Sarawak State Government and 133 Digital Economy Centres (PEDi) under the supervision of the Malaysian Communications and Multimedia Commission (MCMC) have become operational throughout Sarawak. The DCCs and PEDis aim to help rural communities become proficient in ICT and digital entrepreneurship. A total of 23 new PEDis will be built throughout Sarawak next year.
To date, more than 266,000 users have benefited from the programmes and training provided through the DCCs and PEDis. Of this number of users, more than 6,000 users are entrepreneurs who have attended various digital entrepreneurship training sessions at the DCCs and PEDis to improve their skills in using digital platforms to expand their businesses.
Point of Presence (PoP)
Mr Speaker, the Point of Presence (PoP) project implemented by the Federal Government through the Ministry of Communications and Digital (KKD) involves the development of fibre optic infrastructure in rural areas. The PoP project only uses school locations as points of reference, because usually in rural areas where there is a school, there is a community settlement, whether a village or a longhouse.
A total of 60 locations under PoP Phase 1 have been completed, while 681 other locations have been identified under PoP Phase 2, which is currently being implemented and is scheduled to be completed in stages by 2025.
With the implementation of the PoP project, schools and premises within a 2.5 km radius of the PoP location will have the opportunity to subscribe to high-speed internet services from internet service providers. Therefore, the Sarawak State Government calls upon the Federal Government, particularly the Ministry of Communications and Digital (KKD) and the Ministry of Education Malaysia (KPM), to provide special allocations for the work of connecting the PoP fibre optic cable to school premises, together with internet service subscriptions. This is to ensure that school staff and students can enjoy internet services from the PoP facilities. The reason is, as I said earlier, PoP only uses the school as a reference. And it does not enter the school compound itself. So, it is very important that we request that the Ministry of Communications and Digital and the Ministry of Education Malaysia provide special allocations so that schools do not merely see that the facility exists but cannot use it. So that is one of the main reasons why we request special allocations from the two Ministries I mentioned earlier.
Data Centres
Mr Speaker, data centres are one of the main digital infrastructures that will contribute to Sarawak's advancement in technology and the digital economy. With the existence of data centres or data centres, storage, processing and management of data for industry, business, research and public services can be handled efficiently and securely.
At present, Sarawak has the first Tier-4 (Tier-IV) Data Centre in the region, which is already operational and certified by the Uptime Institute. Sarawak also has other data centres operated by the private and public sectors. So, we have one Tier-4 Data Center already and the location is somewhere at Santubong and Buntal area. So, this is an achievement when there is a willingness from among the private sector to set up Tier-4 Data Center. So, we hope there will be more in the near future.
For the information of this august House, MCMC, SMA, SDEC, DNB and TM have opened information and complaints counters from 10 o'clock this morning until 4 o'clock this afternoon at the State Legislative Assembly compound. Honourable Members who require further information on telecommunications projects or services in their respective areas may visit these counters. So, this is the goodwill of MCMC, SMA, SDEC, DNB and TM in providing counters on the ground floor, on level 2, to enable Honourable Members who require further information on the facilities provided in their respective areas. I hope our Members will visit and inquire from them what are the available facilities right now in their respective areas.
DIRECTION
Mr Speaker, next I would like to touch on the direction.
Utility Corridor
For the information of this august House, among our main challenges is the absence of a utility corridor to accommodate all utility and telecommunications facilities such as pipes and cables. This has delayed the implementation of development projects, in addition to increasing project costs due to the difficulty of locating utilities and making maintenance work difficult. Therefore, a utility corridor needs to be established to facilitate the planning of development, relocation and maintenance of utility facilities. Since establishing utility corridor management is very complex, a detailed assessment needs to be carried out. As of now, the Land and Survey Department has been entrusted to assist us in having a Utility Corridor in the near future. So, now I hope it will materialize very soon.
Digitalisation of Water and Electricity Supply
Mr Speaker, for the information of this august House, in line with the goals of PCDS 2030, the Ministry together with agencies under my Ministry constantly strive to implement the Utility Digitalisation Initiative to improve operational efficiency and service quality. To improve the operation of water supply, a command center and a Supervisory Control and Data Acquisition (SCADA) system have been built to monitor water treatment plants and the water supply network system online. The use of Internet of Things (IoT) and Smart Technology enables water supply agencies to detect Non-Revenue Water (NRW), low water pressure, water supply disruptions, and subsequently take early action to rectify these conditions if they occur.
The Sarawak State Government is currently developing a Smart Electricity Grid System to improve the performance of the electricity distribution and supply system. This initiative includes distribution system automation, the latest metering infrastructure, smart asset performance management and digitalisation of power generation plants through remote monitoring and diagnostics. This is an effort towards transforming the electricity grid system into one that is sustainable, efficient and smart. The use of smart water meters and smart electricity meters is a utility digitalisation strategy to improve operational efficiency and service delivery. To date, a total of 69,726 smart water meters and 64,141 smart electricity meters have been installed and will be expanded in stages throughout Sarawak.
Need for Skilled Manpower in the Utility Industry
Mr Speaker, to date a total of 37 local institutions have been authorised by my Ministry to conduct competency courses and related examinations in the utility industry, such as electrical installation work, pipe gas technicians, pipe connection, and gas technicians. My Ministry will authorise more institutions to produce more skilled workers to meet the needs of the utility industry in Sarawak. So I hope Honourable Members will spread the word to young school leavers who may be interested in following the courses provided in cooperation with the local training centres currently available in Sarawak. My Ministry will also review the syllabus from time to time so that the courses offered keep pace with the development of technology and industry needs.
Cybersecurity
Cybersecurity is an important element in digital services. For this purpose, the Sarawak State Government, through SMA (Sarawak Multimedia Authority), has been entrusted with establishing a Cybersecurity Unit in line with the Sarawak Digital Economy Blueprint 2030. This unit will work closely with the relevant agencies to develop security policies, procedures and guidelines to ensure their systems are always well protected against cyber threats.
CHALLENGES
Mr Speaker, next I will present the challenges faced by my Ministry.
Wayleave Problems
In efforts to implement utility and telecommunications development projects, my Ministry still faces several challenges relating to wayleave issues. Therefore, my Ministry has taken several steps to address the wayleave issues that frequently arise in implementing utility and telecommunications projects. For the information of this august House, through the amendment to the Bill, the Electricity (Amendment) Bill, 2023 that has been passed, this amendment directly allows Sarawak Energy Berhad as the electricity licence holder to enter sites for the purpose of implementing, repairing and maintaining electricity projects. This can reduce wayleave problems and thus ensure projects can be implemented without delay. So it is very important to have the power to allow Sarawak Energy Berhad to enter sites when implementing or carrying out maintenance for projects in field areas.
In addition, as a start, this Ministry through SMA (Sarawak Multimedia Authority) will develop a digital application for wayleave applications in the implementation of telecommunications projects. This is to ensure that wayleave application matters can be processed more efficiently and effectively. This digital application system will later be expanded for the implementation of water and electricity supply projects.
Vandalism and Enforcement
Mr Speaker, for the information of this august House, the problem of vandalism against utility and telecommunications facilities remains a major challenge faced by my Ministry and agencies under the supervision of my Ministry. The vandalism that has occurred has caused disruptions to utility and telecommunications services. For the period from 2022 until October 2023, the total losses caused by vandalism are estimated to be worth more than RM20 million. So, this is a big amount when all our utilities are being vandalised statewide. This information source is based on reports by all relevant utility and telecommunications agencies under the supervision of my Ministry.
To combat this vandalism, my Ministry, together with various enforcement agencies at both Federal and State levels, also carries out enforcement activities against acts of vandalism such as theft of telecommunications, water and electricity equipment.
The worst cases include the theft of cables that caused the entire structure of a telecommunications tower to burn down in the Paya Mebi Landeh area, Kuching, recently. This tower was categorised as a corrector tower that connects 11 other towers in the Landeh, Padawan, Siburan and Bau areas, which resulted in the disruption of telecommunications services in the area. Many other similar cases have occurred throughout Sarawak.
In addition, my Ministry has also launched an Anti-Vandalism Campaign in selected secondary schools in Sarawak in cooperation with relevant agencies, particularly the Education Department. This campaign aims to provide early awareness of the adverse effects of vandalism on society. This year, my Ministry has carried out the campaign in three selected schools in Kuching, Sematan and Sibu, involving almost 700 students. So, I hope we will be able to continue the anti-vandalism campaign again next year and I hope we will get better cooperation and participation from among the Honourable Members in this august House because vandalism has a very bad impact on our utilities in the rural areas as well.
Delays in the Implementation of Federally Funded Water Supply Projects
Mr Speaker, for the information of this august House, the Federal Government, through the Ministry of Rural and Regional Development (KKDW), has now implemented several water supply projects in rural Sarawak.
All matters concerning the appointment of consultants, the Value Management Lab, tender invitations, tender evaluation and contract award are handled by the Federal Government through KKDW. However, many projects are delayed due to bureaucratic red tape and lengthy procedures. For example, a total of 13 projects that were approved since 2016 are still at the pre-contract stage and have not yet started. I want to emphasise here that the process as mentioned earlier is currently handled entirely by the Ministry of Rural Development and Regional Development (KKDW).
This delay has also caused projects planned under the Sarawak Water Supply and Grid Master Plan to be unable to be implemented on schedule. This in turn has also affected the people of Sarawak who have long been waiting for treated water supply in their respective areas. Therefore, I call upon the Federal Government to give serious attention to this matter and to expedite the implementation of these projects so that the people can enjoy the water supply as planned.
Specific Issues
Mr Speaker, I will now respond to the issues raised by the Honourable Members.
Specific Issues on Water Supply
I will address the specific water supply issues raised by the Honourable Members. For the information of the Honourable Member for Padungan, to deal with the problem of murky water in Desa Wira, Kenyalang Park and Bintawa, the Kuching Water Board (LAK) has carried out flushing works and complaints have decreased. The Kuching Water Board will continue to intensify flushing works in its areas of supervision on a scheduled basis. So, when there is no problem and when the problems have been solved, I think we should appreciate and be grateful and say thank you to our Water Agencies. So that we make them more motivated in the near future, so, let us not only inform them when problems arise, for them to act immediately, but then when the problem is solved, it is good to say thank you very much to our Water Agencies.
Meanwhile, to deal with the water supply disruption that occurred in Semaba, the Kuching Water Board has completed the replacement of old water pipes in four lanes, namely Lane 2, 3, 5 and 8. The Kuching Water Board will proceed with the implementation in the other seven lanes in phases. In addition, old water pipes of various sizes will be upgraded and replaced in phases in the coverage area of the Kuching Water Board (LAK).
For the information of the Honourable Member for Opar and Tanjong Datu, the proposed new Water Supply Project for the Lundu/Sematan area, which includes the construction of a new Lundu Water Treatment Plant (LRA) with a capacity of 20 million litres a day (JLH), water pipelines, storage water tanks and booster water pumps, was recently approved by the Sarawak Government under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMK-12). This project is at the initial design stage. The raw water source and the construction of the intake weir will come from the Jangkar River, Lundu.
Mr Speaker, for the information of the Honourable Member for Ba'Kelalan, to deal with the water supply problem in Pekan Lawas, this Ministry, through the Rural Water Supply Department (JBALB), has carried out and is carrying out water supply projects in phases.
The projects that have been completed to increase water capacity are as follows:
(a) Upgrading of the Trusan Water Treatment Plant from 20 million litres a day (JLH) to 40 million litres a day (JLH); (b) Upgrading of the Merapok Water Treatment Plant from 0.45 million litres a day (JLH) to 2 million litres a day (JLH); and (c) Improvement of the Gelugus Water Treatment Plant with a capacity of 5 million litres of water a day (JLH).
There are five more projects still under construction, namely:
(a) Water pipeline from the Merapok high-level tank (HLT) to the junction of SMK Merapok, Rumah Ajan and the Meragang Farming Station, along the main Lawas-Merapok-Sindumin road, to 10 villages in Ulu Merapok and to SK Ulu Merapok, Lawas; (b) Water pipeline to Long Suang, Murud Suang, Logan Kelilang, SK Long Kachu and Seberang Kedai Trusan; (c) Replacement of the 1.5 million litre (JL) high-level water tank in Sundar, construction of a 0.5 million litre (L) high-level water tank in Awat-Awat, upgrading of the water pipeline to Kampung Bangkiai, and replacement of water pipes in Kampung Perpindahan, Sundar and from the Sundar high-level water tank up to Kampung Berjumpa. Kampung Berjumpa is a nice village name. There could be somebody using it as a meeting place. I do not know; (d) Replacement of water pipes in Kampung Seberang Awat-Awat, Sundar; and (e) Connection of water pipeline from Kampung Beriwan Tengah to Long Tengoa and Long Ibau Ulu Trusan, and construction of a booster pump station and high-level water tank in Long Sebulu, Bukit Batu, Lawas, Limbang.
All the projects I have just mentioned are expected to be completed in the second quarter of 2024, which is next year.
Mr Speaker, for the information of the Honourable Member for Daro, the Daro and Matu Water Catchment Areas, with areas of 4,487 hectares and 17,757 hectares respectively, have already been gazetted as water catchment areas in 2003.
For the information of the Honourable Member for Dudong, the Ministry, through the relevant agencies, has taken note of the problem of low water supply in the Kelupu-Julau-Durin (KJD) road area. For this purpose, Project Central Region 1 - Work Order 8 and Work Order 6, which cover the scope of connecting pipes of various sizes, construction of booster pump stations and construction of high-level water tanks, with a total cost of RM35 million, is currently being actively implemented. This project is expected to be fully operational in the third quarter of 2024. So, I hope that when we do the site visit in the near future, the Member for Dudong will follow us to the site. Please do not just send your representative because I have been to the site quite a number of times and those who are normally sent are the representatives. So, I do not know whether the representatives make a report to the Member after visiting the place.
In addition, with the completion of the Stage 3 pipe connection by the Pan Borneo Highway contractor from the Bulat junction to the Bintangor KJD junction, which is expected to be completed at the end of 2023. When these projects are completed, the water supply system in the KJD road area and its surroundings, especially Assan Nunggang, will improve.
Mr Speaker, for the information of the Honourable Member for Dudong, the implementation of water supply projects in Sarawak is based on the Sarawak Water Supply Master Plan and Water Grid. Accordingly, the planned projects will be implemented in phases based on the approval of financial allocations.
To resolve the water supply issues raised, my Ministry, through the Sibu Water Board and the Rural Water Supply Department (JBALB), has carried out and is planning several projects as follows:
(a) Construction of a 1,000 mm diameter pipe along 1.92 km from the Salim Water Treatment Plant (LRA) to the Farley Junction has already been completed and has solved the water supply problem in Eco Garden and the water pressure problem in Sibu Jaya, except for levels 3 and 4 of Sibu Jaya Flats; (b) Installation of a 600 mm diameter pipe along Jalan Tunku Abdul Rahman through Sibu Jaya to the Durin Booster Station. This project is expected to be completed in the second quarter of 2024 and will enable adequate and continuous water supply throughout the whole Sibu Jaya area, except for levels 3 and 4 of Sibu Jaya Flats; and (c) To overcome the water pressure problem on levels 3 and 4 at Sibu Jaya Flats, the project to replace the High Density Polyethylene (HDPE) pipes at Sibu Jaya Flats and the installation of Ductile Iron (D.I.) pipes from the Sibu Jaya junction to the booster pump station will be implemented in the first quarter of 2024 and is expected to be completed at the end of 2024.
In fact, we have also solved the water supply problem in part of the water needs at Sibu Jaya Flats. So, based on what we have found now, previously the water problem was critical, but now water can be obtained on the ground floor and level 1, only the ground floor, level 1 and level 2. The problem on levels 3 and 4 occurs during peak time. During peak time there is no water supply, only a trickle comes out. And, I have to understand this because Sibu Jaya itself, I think, is very congested. I have visited the site together with officers, together with the Deputy Ministers in my Ministry and officers from our water agency, and we witnessed that the place is very congested. And we also witnessed, I think there are illegal extensions and I was made to understand that the number of people living in Sibu Jaya Flats is also very large. Perhaps it exceeds the number of residents allowed. So, this causes the demand for water supply to be very high. So, it is beyond a water problem, there could be some other problems that need to be solved. So, I hope the Member for Dudong will look into this in the near future, so that it is easy for us to settle the problem. Not only a water problem, yes.
To overcome the water pressure problem on levels 3 and 4 at Sibu Jaya Flats, the project to replace the High Density Polyethylene (HDPE) pipes at Sibu Jaya Flats and the installation of Ductile Iron (D.I.) pipes from the Sibu Jaya junction to the booster pump station will be implemented in the first quarter of 2024 and is expected to be completed at the end of 2024. So, I repeat this.
Meanwhile, for the long-term plan, the "Upgrading of Water Plant" project, while for the long-term plan, the Salim Phase 3 Plant Upgrading project from 150 million litres of water a day (JLH) to 300 million litres a day (JLH) will be implemented with an allocation of RM300 million, which will be financed by the Sarawak Government. This project will be implemented in the second quarter of 2024 and is expected to be completed at the end of 2026. Among the benefits of this project are as follows:
(a) As an anchor plant in the Central Region of Sarawak (Central Region) under the Sarawak Water Supply Master Plan and Water Grid; (b) Ensuring adequate water reserve margin at a minimum rate of 20% of the water plant's capacity; and (c) Ensuring that the water supply in the Central Region, including Dudong, is adequate and continuous until 2035.
So, this is a big step that we have taken, and the Sarawak Government has been kind enough regarding the needs by approving RM300 million to implement the upgrading of the Salim Treatment Plant, Water Treatment Plant from 150 (MLD) to 300 (MLD), and hopefully it will commence sometime next year as I mentioned just now.
Mr Speaker, apart from the projects stated above, six more projects have been approved by the Sarawak Government under the Twelfth Malaysia Plan (RMK-12) and will be started in phases, beginning in 2024 and expected to be completed by 2028. The projects are as follows:
(a) Installation of pipeline from Ulu Oya Lama to Sibu West and construction of a water tank; (b) Construction of main pipeline from the Teku Booster Pump Station to Jalan Teku Pasai and the Rantau Panjang Water Tank; (c) Installation of distribution pipeline along Jalan Tun Ahmad Zaidi Adruce; (d) Installation of main pipeline from Jalan Tunku Abdul Rahman to Jalan Kemuyang and construction of the Kemuyang Water Tank; (e) Connection of the Jalan Tunku Abdul Rahman pipeline; and (f) Construction of the Ulu Sungai Merah Water Tank.
The six projects I have just mentioned are aimed at improving the water supply system in the areas of Sungai Maaw, Bawang Assan, Teku, Teku Pasai, Jalan Tun Ahmad Zaidi Adruce, Jalan Kemuyang and Jalan Ulu Sungai Merah.
Mr Speaker, for the information of the Honourable Member for Meluan, the Proposed Julau Water Supply System, Sarikei Division project has been approved under the Mid-Term Review of RMK-12 and will be financed by the Sarawak Government. This project involves upgrading the existing Julau Water Treatment Plant from 1.3 million litres a day (JLH) to 4.0 million litres a day (JLH), construction of high-level water tanks, booster pump stations and pipe connection works in Pekan Julau and surrounding areas. This project is expected to be tendered at the end of this year.
The water supply system for the KJD road area will improve with the completion of Project Central Region 1 - Work Order 8 and Work Order 6, which are each expected to be operational in the third quarter of 2024.
Meanwhile, for the construction of a high-level water tank at Bukit Agok, it has been included in the scope of the Julau Phase II Rural Water Supply project under the implementation of the Ministry of Rural and Regional Development (KKDW), which is currently in the design process.
For information, the areas raised by the Honourable Member for Kalaka still do not have pipelines. For information, I repeat, for the information of the areas raised by the Honourable Member for Kalaka, they still do not have treated water pipelines.
The treated water supply project for Kampung Kaba, Kampung Hilir Perpat, Kampung Tengah Perpat and Kampung Paloh is being implemented under Package 1 - Water Supply Works in Kabong District, with a project cost of RM107.5 million financed by the Sarawak Government, RM107.5 million borne by Sarawak Government. This project is expected to be fully completed in the second quarter of 2024.
Mr Speaker, for the information of the Honourable Member for Balingian, the proposal for a water supply grid system that will link water sources from the Mukah Main Water Treatment Plant to the Balingian - Kuala Balingian area, including the Setuan Kecil area, has been approved under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMK-12). This project aims to ensure a more stable water supply in the areas raised.
For the information of the Honourable Member for Lingga, the Project to Upgrade the Bayai Water Treatment Plant from 33 million litres a day (JLH) to 53 million litres a day (JLH), at a cost of RM21.5 million fully financed by the Sarawak Government, was completed in 2021.
At the early operation of Hospital Sri Aman 2, there was a problem of water pressure and the internal reticulation system at the hospital. However, this problem has been overcome by JKR Malaysia.
For long-term planning, two water supply projects, namely the Proposed Engkilili Regional Water Treatment Plant, Sri Aman Division and the Proposed Sri Aman Regional Water Supply System, Sri Aman Division, were recently approved by the Sarawak Government under the Mid-Term Review of the Twelfth Malaysia Plan for implementation. The preliminary design of the projects will be carried out in the near future. The projects will connect areas in Sri Aman Division to the water supply grid system to ensure adequate and continuous treated water supply to users in the Sri Aman area, including Lingga.
For the information of the Honourable Member for Machan, the low water pressure problem in the Pekan Kanowit and Machan area will improve upon the completion of the Proposed Water Supply Kanowit Phase 2 (Stage 2) Sibu Division - Proposed Pipeline from Salim Water Treatment Plant, Sibu Water Board to Kanowit, Sibu Division, at a total cost of RM63.5 million fully financed by the Sarawak Government. This project is expected to be completed in the third quarter of 2024. Meanwhile, the areas of Batu Luking, Mam and Majau will be supplied with water through the Proposed Kanowit Regional Water Supply, Sibu Division project, which was recently approved by the Sarawak Government under the Mid-Term Review of the Twelfth Malaysia Plan. With the completion of this project, it is expected to solve the water supply problem in the Machan area.
For the information of the Honourable Member for Tellian, the tender for the treated water supply project to the Bukit Engkerbai and Lubok Bemban areas is expected to be called in the first quarter of 2024. Meanwhile, the treated water supply project from Selangau to the Ulu Baoh area is currently at the design stage. Both projects are Federal projects under the supervision of KKDW. The treated water supply project in the Ulu Sebakong - Nanga Sikat area has been submitted to KKDW under the 2024 4-Year Rolling Plan for consideration. Regarding the issue of delays in connecting water meters to residential homes across the road, the water grid raised has already been resolved. The JBALB will carry out the connection of water meters in the near future. Meanwhile, the operation and maintenance works for SAWAS at Nanga Baoh, Dalat will be carried out on a contract basis, and tenders will be called at the end of this year, and it is expected to be operational in the first quarter of 2024.
Mr Speaker, for the information of the Honourable Member for Tamin, the Project to Upgrade the Water Treatment Plant at Stapang, Sekuau was approved by the Federal Government in 2017. This project is under the supervision of KKDW. The processes of appointing consultants, calling tenders, evaluating tenders and awarding contracts are handled entirely by KKDW. So, I hope it will be implemented very soon, and I fully understand the feelings of the Honourable Member for Tamin, but unfortunately, this is beyond our control because it is under the jurisdiction of the Federal Government, which is now under KKDW.
Meanwhile, the works to upgrade the Selangau Water Treatment Plant and water supply to the Selangau area have been included in the scope of the Rural Water Supply (BALB) Project for the Sungai Arip Area, Sibu Division, Ulu Baoh & Sebakong, Mukah Division, Sarawak, which is currently at the design stage. For the information of the Honourable Member for Ngemah, water supply for the areas raised will be implemented through the Proposed Kanowit Regional Water Supply, Sibu Division project, which was recently approved under the Mid-Term Review of the Twelfth Malaysia Plan and is fully financed by the Sarawak Government.
For the information of the Honourable Member for Engkilili, the water supply project to part of the Ulu Skrang area was approved in 2016 by the Federal Government under the supervision of KKDW and is now only at the tender evaluation stage. As stated earlier, the processes of appointing consultants, calling tenders, evaluating tenders and awarding contracts are handled entirely by KKDW. However, the Sarawak Government, through my Ministry, is deeply concerned about the water supply problems in rural areas of Sarawak, including the Engkilili area, as raised by the Honourable Member in this honourable House.
This has been proven when the Sarawak Government approved three additional projects to overcome the water supply problem in the Engkilili area. The projects are:
(a) Proposed Engkilili Regional Water Treatment Plant, Sri Aman Division with a capacity of 75 million litres a day; (b) Proposed Sri Aman Regional Water Supply System, Sri Aman Division, pipeline of 295 km including water storage tanks, booster pump stations and related works; and (c) Sarawak Alternative Water Supply (SAWAS) project, phase 3, I repeat, Sarawak Alternative Water Supply (SAWAS) phase 3 for areas that cannot be connected to the water supply grid. Meanwhile, water supply to Memaloi is expected to be fully restored after the utility relocation works and the installation of new pipes are fully completed by the Pan Borneo Highway contractor under the supervision of JKR Sarawak.
For the information of the Honourable Member for Bukit Begunan, during the dry season, in addition to sending water tanker lorries to supply water to affected users, the Rural Water Supply Department (JBALB) has also consistently provided water collection centres at strategic locations such as Pekan Lachau, Pekan Sungai Tenggang and surrounding villages. The Rural Water Supply Project, Pantu Area Phase III, Sri Aman Division, which was approved by the Federal Government in 2018, is under the supervision of KKDW and is understood to be only at the design stage. The processes of appointing consultants, calling tenders, evaluating tenders and awarding contracts are handled entirely by KKDW, as I said earlier.
For long-term planning, two water supply projects, namely the Proposed Engkilili Regional Water Treatment Plant, Sri Aman Division and the Proposed Sri Aman Regional Water Supply System, Sri Aman Division, aim to connect the water supply grid system in Sri Aman, Engkilili and Pantu. These projects have been approved by the Sarawak Government under the Mid-Term Review of the Twelfth Malaysia Plan. Meanwhile, the proposal to connect treated water to the Panggil, Engkeramut, Selepong areas up to Kampung Gua has been noted for further action.
For the information of the Honourable Member for Batu Danau, the treated water supply projects to the areas raised are under the supervision of and will be implemented by RECODA.
The first phase of the Proposed New Extension of Water Supply Pipeline and Associated Works from Bawang Ubor-Pangkalan Jawa Junction to Rumah Jubang Junction, Limbang District, Limbang Division is being implemented, covering the area from Simpang Pangkalan Madang to Kampung Ukong/SK Ukong. This project commenced on 25 September 2023 and is scheduled for completion on 24 March 2025.
As for the second phase, RECODA will submit an application for allocation for the implementation of treated water supply to the Simpang Ukong/Tanah Merah area for consideration.
As for water supply to the Nanga Medamit/Pulau Brunei and Simpang Semena/Kuala Mendalam areas, these have been included in the scope of the road construction project, namely The Proposed Construction of New Road and Water Supply from Nanga Medamit to Rumah Aling, Limbang District by RECODA, and tenders will be called in the first quarter of 2024.
For the information of the Honourable Member for Kabong, the water supply project to the Ulu Roban area was approved in 2021 under the allocation of the Federal Government, under the supervision of the Ministry of Rural and Regional Development (KKDW), and is understood to be only at the design stage. The processes of appointing consultants, calling tenders, evaluating tenders and awarding contracts are handled entirely by KKDW.
For the information of the Honourable Member for Beting Maro, the treated water supply project for Kampung Batang Maro is being implemented under the Water Supply Works in Kabong District project. This project, which is financed by the Sarawak Government, costs RM107.5 million and is expected to be completed in the second quarter of 2024. This project covers the upgrading of the Lichok Water Treatment Plant from 12 million litres a day (JLH) to 15 million litres a day (JLH), construction of four water storage tanks, and installation of pipelines of various sizes along 100 km up to Kampung Batang Maro. This means, there is a water project leading to Batang Maro, and hopefully, once completed, the project will provide water supply to Batang Maro.
Meanwhile, the upgrading of the Beladin Water Treatment Plant has just been approved by the Sarawak Government under the Mid-Term Review of the Twelfth Malaysia Plan through the Proposed Upgrading Works at Pusa, Beladin and Maludam Water Treatment Plant, Betong Division project.
Specific Issues (Electricity Supply)
Mr Speaker, next I will touch on the specific issues of electricity supply that were raised by the Honourable Members.
For the information of the Honourable Member for Padungan, when Sarawak commences power export to Singapore and with the additional generation capacity built in 2032, our generation capacity shall be 9,529 Megawatt (MW), sufficient to meet both the domestic and export demand. The firm power export of 1,000 Megawatt (MW) represents only 10% of the total generation capacity.
Power export to Singapore is from the Sarawak Grid System instead of a specific generation source or specific hydro power plant. Power export to countries such as Singapore and other neighbouring countries will expand and diversify our customer base in Sarawak. This will also be a further catalyst for economic growth in the State, especially in the new generation plants such as hydro and solar. It will also contribute towards upgrading electricity transmission and distribution infrastructure, statewide. Indirectly this will also support local companies by maintaining power supply stability and affordability of electricity tariffs in Sarawak.
Power export to premium markets such as Singapore would, definitely bring better revenue which ultimately will contribute to Sarawak's economic growth. This will assist the growth of our revenue in the near future.
Mr Speaker, for the information of the Honourable Member for Padungan, Sarawak has already launched Renewable Energy Certificate (REC) four years ago during the Inaugural Sustainability & Renewable Energy Forum (SAREF) in 2019. This launching was witnessed by Yang Amat Berhormat Premier (then addressed as Chief Minister) and United Nations Goodwill Ambassador, Tan Sri Michelle Yeoh, among others. With this, any corporate entity including local companies can actively participate in procuring RECS to prove that their energy source comes from Sarawak's Renewable Energy supply.
Therefore, the suggestion by the Honourable Member for Padungan is not something new. In other words, Sarawak Government under GPS is far ahead of the Honourable Member for Padungan. The Honourable Member for Padungan should have read more local news otherwise in this case you are four years behind. You must read, you must also read local news, do not be very selective. Do not just read news for the benefit of parties who have no connection with Sarawak. But again, I don't see the Honourable Member for Padungan in this august House today. So, I hope and how I wish he listens to my winding up so that he will be updated.
Local companies who are truly committed to Environmental, Social and Governance (ESG) can procure these RECS on a voluntary basis ("willing buyer willing seller basis") to be integrated into their sustainability reporting and Corporate Social Responsibility (CSR) efforts, demonstrating their commitment in being environmentally responsible.
There are ample RECS available to meet local demand, emphasizing the priority of supporting local corporations dedicated to achieving ESG goals. With the upcoming Baleh HEP development and solar development initiatives, Sarawak aims not only to increase the supply of RECS but also diversify the offering of our RECS.
Mr Speaker, for the information of the Honourable Member for Tanjong Datu, electricity supply to the Lundu area is connected via an overhead line of 50 kilometres from the Bau substation. Until October 2023, it was found that 90% of supply disruptions were caused by bad weather, while the rest were caused by temporary line faults (transient) and overhead line faults. To improve the electricity supply performance in Lundu, Sarawak Energy has taken and will take the following actions:
(a) maintain and trim tree branches or twigs near the overhead line regularly and more vigorously;
(b) install smart equipment and devices using digital technology such as Auto Recloser (AR), Load Break Switch (LBS) and Line Fault Indicator (LFI) to reduce response time when electricity supply disruptions occur; and (c) implement an underground cable connection project of 20 kilometres from the Tondong main substation to Stenggang in the second quarter of 2024. The purpose of this project is to replace part of the existing overhead line to address electrical disruptions in the Lundu area.
For the information of this honourable House, the proposal by the Honourable Member for Kota Sentosa has been taken into account in the amendment to the Electricity Ordinance (Chapter 50) which I tabled in this honourable House last Tuesday.
With the passing of this amendment, the development of the renewable energy sector in Sarawak will be able to be intensified through participation in the Net Energy Metering (NEM) scheme. The role of Sarawak Energy as the "single buyer" is also established as a single entity to facilitate the development of the renewable energy sector in Sarawak. This is in line with our aspiration to develop solar energy as one of the alternative energy sources.
For the information of the Honourable Member for Meluan, internal wiring is the responsibility of the house owner. Therefore, house owners are advised to inspect their own internal wiring by using the services of licensed contractors. I think this, Honourable Member for Meluan can get an assistance from SESCo or Sarawak Energy if they want to know who are the qualified and registered Contractor.
In addition, house owners or premises are reminded to ensure that the equipment used bears the SIRIM safety label to avoid the risk of electrical accidents that may cause fire. Our Ministry also conducts activities in longhouses and villages together with agencies such as Sarawak Energy and the Malaysian Fire and Rescue Department (JBPM) on electrical safety awareness.
For the information of the Honourable Member for Kalaka, Kampung Kabang, Kampung Hilir Tengah and Hulu Perpat, Rumah Galing, Rumah Mujang, Rumah John Yong, and Rumah Tanjung have been in darkness for three consecutive days due to damage to the submarine cable by the contractor implementing the Sungai Krian Bridge project. That is beyond our control, so the cable, submarine cable was damaged by the contractor who is currently doing the Sungai Krian Bridge which is one of the bridges along the costal road. Sarawak Energy took three days to detect and repair the damage due to complicated repair works and safety factors. Electricity supply to this area is via a spurline as well as submarine cable connection.
In addition, house owners or premises are reminded to ensure that the equipment used bears the SIRIM safety label to avoid the risk of electrical accidents that may cause fire. Our Ministry also conducts activities in longhouses and villages together with agencies such as Sarawak Energy and the Malaysian Fire and Rescue Department (JBPM) on electrical safety awareness.
In addition, Sarawak Energy continues the "Call Before You Dig" awareness campaign to address the problem of damage to electrical cables by third parties. So normally, we would like to request the third party who are doing their work in the respective areas, please do call our Sarawak Energy Berhad (SESCo) if you want to do any digging or excavation in the area, so that we can notify where actually our cable, and this will minimize the damage to our cable and in turn will cause a power outrage in the nearby area. So, we are appealing to the third party involved and the contractor involved, please do care to call our Sarawak Energy Berhad and SESCo so it will not trigger in the near future.
For the information of this honourable House, the Betong Division Development Agency (BDDA), in collaboration with Sarawak Energy, will implement an additional distribution line construction project from Kampung Kaba to Simpang Nyabor to reduce the incidence of electricity supply interruptions in the Kalaka area. Our Ministry fully supports the suggestion of the Honourable Member for Kalaka and calls on all parties to seize the opportunity to participate in Net Energy Metering (NEM). Yes. Thank you very much for your support and I hope members in this august House will participate in Net Energy Metering. Thereby contributing to the generation of solar energy to our main grid.
Mr Speaker, for the information of the Honourable Member for Lingga, the risk of supply disruption in the Lingga and Sri Aman areas is due to a long overhead line within a range of 40 km. To improve the electricity supply system to Sri Aman town, Sarawak Energy is implementing the construction of a 48 km tower line from the Serudit main substation to Simpang Sri Aman. The project, which costs RM57 million, has reached a level of more than 80% completion so now it is at the stage of 80% completed. Meanwhile, for the installation of an underground cable of 10 kilometres from Simpang Sri Aman directly to Sri Aman town, the award is expected at the end of next month. Both these projects are expected to be completed in the fourth quarter of 2024.
For the information of the Honourable Member for Batu Danau, the Penan settlements, as informed, have been listed to receive the major component replacement initiative which will be implemented in phases. Among the works to be carried out are maintenance of the existing system and battery replacement.
For the information of the Honourable Member for Kabong, the line connection project of 5.6 kilometres from Selalang via Jalan Nyabor to Kabong, valued at RM1.3 million, is being implemented. This project is expected to be completed in December 2023. When this project is completed, Kabong will get an additional source of supply.
Apart from that, three units of Load Break Switch (LBS) and eight units of Line Fault lndicator (LFI) have been installed. Seven more units of Line Fault lndicator will be installed in the first quarter of 2024, which is next year. With the installation of these smart devices, the operations team will be able to detect faults on the overhead line (overhead line) more quickly and expedite the restoration of supply disruptions. As for the long-term measure for the Kabong area, it is the planning of the construction of monopole towers for a 33 kV line of 45 kilometres from the Serudit main substation to Pekan Saratok.
Mr Speaker, for the information of the Honourable Members for Kalaka, Dudong, Ba'Kelalan, Tellian, Tamin, Kabong, Ngemah and Batu Danau, the ALAF project across Sarawak is now at various stages of implementation. For new applications, implementation is based on queue order and the availability of complete information from applicants after the additional allocation is approved. So please, I hope Members in this august House will be patient enough to wait because ALAF is being implemented progressively right now. So any new application in the near future you still have to follow the queue. Because if we cut in front of others in the queue, others will also complain about slow electricity supply, so we hope any new application in the future will realise the fact that we prioritise those who submit complete information and are being processed for implementation, and the new ones must wait in the queue, each in their own turn.
Specific Issues (Gas)
Mr Speaker, the establishment of a Gas Aggregator and the appointment of Petroleum Sarawak Berhad (PETROS) are the right decisions of the Sarawak Government. The objection of the Honourable Member for Padungan regarding the establishment of a Gas Aggregator and the appointment of (PETROS) as Gas Aggregator was indeed anticipated by us. I would like to inform this honourable House that the Memorandum of Understanding (MOU) signed between PETROS and PETRONAS only states the quantity of gas required for the Sarawak Gas Roadmap up to 2030. Based on the MOU, PETRONAS only allocates gas resources without determining the price of the gas supplied. Furthermore, this MOU is not legally binding.
Therefore, by appointing PETROS as Gas Aggregator, this can increase the use of gas in Sarawak to at least the level of 30% by 2030. So, hopefully our target of achieving utilisation of 30% of gas in Sarawak will lead to more downstream industries in the near future and definitely this will give job opportunities and opportunities for any local companies who participate in the near future so this novel aim should be supported by all including Honourable Member for Padungan.
The view of the Honourable Member for Padungan on the disadvantages of gas use is inaccurate. The Sarawak Government has taken a wise step in efforts to change energy transition from the use of coal or diesel to gas because the energy source from gas is comparatively cleaner than the energy source of coal and diesel, as I explained in detail in my earlier winding up just now. We need to take a far-sighted view as planned under PCDS 2030. Do not be narrow minded and short sighted. So, I would like to advise the Honourable Member for Padungan please do not be narrow minded and short sighted. Look far ahead like what we are doing right now.
Specific Issues (Telecommunications)
Allow me to provide clarification on the telecommunications issues in Sarawak raised by the Honourable Members.
For the information of the Honourable Member for Baleh, every tower construction project will involve engagement sessions with the Residency and District Office, landowners and stakeholders to ensure transparency in the implementation of this initiative and to determine suitable site locations that meet the technical requirements of telecommunications towers.
For the information of the Honourable Members for Ba'Kelalan, Kalaka, Simunjan, Ngemah, Engkilili, Kabong, Tamin and Beting Maro, all towers being implemented in the respective state constituencies are scheduled to operate in phases until the third quarter of 2024. Therefore, I hope the Honourable Members can be patient in waiting for better telecommunications services when the towers are fully operational later. What it means is, once all these towers are on air, then you have to wait a short while.
In closing, Mr Speaker, before I end my speech, I first extend my highest congratulations and appreciation to Mr Speaker, Deputy Speaker, the Secretary and all Dewan officers for conducting the proceedings of this sitting so well. Thank you also to the Sarawak State Secretary, the Federal Secretary, the Sarawak Attorney General, the Sarawak State Financial Secretary, all Permanent Secretaries of Ministries, Heads of Department, the Hansard reporters and all parties who have cooperated to make this sitting of the Dewan a success.
I also wish to record my appreciation and thanks to both Deputy Ministers in my Ministry, the Permanent Secretary and all officers in my Ministry as well as all agency officers under the supervision of the Ministry of Utilities and Telecommunications for their high commitment during this sitting of the Sarawak State Legislative Assembly. On this occasion too, to my friends who are Christians, I wish to extend greetings for a happy Christmas Day, and to everyone, a happy New Year 2024 to come. I pray to Allah S.W.T. that He always bestows His blessings upon us all and protects Sarawak, my motherland, so that we continue to stay united, peaceful, prosperous and progressing. In closing, Mr Speaker, I would like to present several pantun.
YAB Premier's ideas are sound, Hydrogen technology is the right choice, Utility facilities continue to be expanded, And telecommunications further strengthened.
Terubuk bought in Sebuyau town, Empurau brought from Belaga, Do not worry, YB, The water supply equipment continues to be worked on.
Well water at Pantai Damai, The wind blows, feeling wistful, Let us all come together, Raise Sarawak so it keeps advancing.
The Jepak election has ended, The GPS party has been given the mandate, Solid support is truly tremendous, Progress and prosperity, the people's choice.
Driving a car to Lundu, Every moment, step with thrift, The Premier drives, we are guided, For the sake of the people we serve.
That concludes my speech, thank you, Mr Speaker.
Honourable Members, we have lunch break. Dewan resumes at 2.30 p.m.
(Meeting suspended at 1.03 p.m.)
(Meeting resumed at 2.37 p.m.)
[Deputy Speaker in the Chair]
Honourable Members, I respectfully invite YB Dato Sri John Sikie anak Tayai, Minister in the Premier's Department, to deliver the winding-up speech. Please proceed.
Selamat petang, Salam Sejahtera, Salam Sarawak Maju Makmur dan Salam Sarawakku Sayang. Tuan Speaker, Yang Berhormat Ahli-ahli Dewan yang mulia ini, I would like to thank Tuan Speaker for giving me the opportunity to deliver my winding up speech this afternoon relating to the Majlis Adat Istiadat Sarawak and Mahkamah Bumiputera Sarawak and matters referred to me on Unit Pentadbiran; and Unit Pengurusan Imigresen dan Buruh (ILMU); State Implementation Monitoring Unit (SIMU), Premier's Department of Sarawak.
Majlis Adat Istiadat Sarawak
Now, I start my with matters relating to Majlis Adat Istiadat Sarawak. Tuan Speaker, the Majlis Adat Istiadat Sarawak (MAIS) was established vide Majlis Adat Istiadat Ordinance, 1977 primarily as an advisory body to advise the TYT Yang di-Pertua Negeri and the Cabinet on all matters relating to the Adat of the natives of Sarawak. The other functions of the Majlis may be summarised as the preservation, promotion, and dissemination of Adat of the natives.
As long as the natives of Sarawak live in social groups, most Adat are still important for the regulation of their social, economic, and political relations. There are still many affairs peculiar to the native communities in their traditional environment which are not regulated by the laws of Sarawak and the Federal laws.
In view of the rural-urban migration of natives, Adat is also important and practised by the native communities in cities and towns. Adat, in this instance, are used as tool for the administration and management of the native communities at the grass-root or longhouse and kampung level. As such, Adat are quite similar in importance to the laws of Sarawak and the country, Malaysia, for the regulation of the social, economic, and political relations of the people in general.
With regard to the advisory roles and functions of MAIS, the majority of the 11 members are appointed from among the community leaders of the major races of Sarawak, namely Temenggong and Pemanca. They are knowledgeable in Adat, culture and traditions of the respective race.
Now, I would like to highlight some of the programs and activities of Majlis Adat Istiadat Sarawak in its functions in the preservation, promotion and dissemination of Adat.
Preservation of Adat
First, preservation of Adat confines mainly to research, study and codification of Adat. The learning and teaching of Adat is based on oral traditions; that is by words of mouth and listening. The depository of knowledge of Adat is in the memories of the elders which would be disappeared with their demise. The survival of knowledge depends on the prevailing social circumstances and memories of the younger generation.
Modernisation, conversion to Christianity and other religions, and other social changes and development are challenging and impeding the relevance and significance of Adat. As such, there seems to be a trend that the relevance and significance of some Adat are diminished. While some Adat are discarded or abandoned.
Tuan Speaker, there is a growing concern for the loss of knowledge in Adat among the current generation of natives. The loss of knowledge in Adat is not like the loss of money. We can recover the loss of money, but we may never recover the loss of knowledge in Adat. It may be a loss forever. In view of the circumstances which I have mentioned, MAIS is racing against time in its effort to preserve Adat. During the last 10 months of this year, MAIS has conducted 29 series of workshops and fieldworks for data collection through interviews, discussions, dialogues, and with the Bidayuh, Iban, Melanau and the Orang Ulu communities. The main focus of the activities are on Adat relating to settlement matters, family matters and land and their property.
MAIS has received a request from some Remun community leaders in Serian to preserve their Adat through codification. This community has been presumed to be part of the Iban race and their Adat are similar to the Adat practised by the Iban. However, some Remun community leaders contended that Adat Remun are quite different and distinct from the Adat Iban. The Remun language, if I may say so, the tradition are quite different from Iban language. There are some terminologies which are peculiar to the Remun. The aim, among others, is to preserve their traditional knowledge, identity, culture, tradition, legacy, and history.
Four engagement sessions in the forms of dialogue and discussions have been conducted with Remun community leaders this year. The sessions are still in the initial stage and more engagement with them to be conducted in the near future. The Salako-Rara community in Lundu has requested MAIS to conduct a study and incorporate the Adat in which are peculiar to the community in Adat Bidayuh 1994. For this purpose, five engagement sessions in the form of dialogues and discussions have been conducted with this community. This effort is in its initial stage of the study.
The community leaders from the Kayan and Kenyah communities have requested the codified Adet Kayan-Kenyah 1994 to be separated and to become two distinct and different Adet; namely Adet Kayan and Adet Kenyah. The reason is that there are some obvious differences or variations in their languages. In addition, there are dissimilarities between the Kayan and Kenyah in the Miri Division and the Kayan and Kenyah in Kapit and Bintulu Divisions. MAIS would carry-out the study work next year.
The other preservation of Adat focuses mainly on review of the codified Adat and data collection. The flux of social changes and development which are taking place in the native communities have to a certain extent diminished the relevance and significance of Adat. Under such circumstances, Adat have to be rejuvenated or reinterpreted to adjust and adapt them to new social circumstances. Otherwise, Adat would be irrelevant and would die a natural death. In some cases, where new social situations arise but there is no clear Adat to regulate the situations. In such circumstances, new Adat have to be formulated to regulate the affairs or relations. Toward this end, MAIS has organized eight sessions for the Iban, 12 for the Bidayuh, six for Orang Ulu and three for the Melanau. The sessions were mainly workshops, dialogues, interviews and round table discussions.
Promotion of Adat
Promotion of Adat focus on giving the awareness and importance of Adat to the native communities. In this respect, MAIS has organized four courses: one each for the Iban, Bidayuh, Orang Ulu, and Melanau.
MAIS also conducted an engagement session involving the Native Ketua Masyarakat throughout Sarawak highlighting challenges and way forward for MAIS at Kuching in June 2023. This session has successfully enlightened the Ketua Masyarakat on relevant matters pertaining to the Adat.
In addition to these courses, MAIS has conducted eight outreach programs relating to the awareness and promotion of registration of native marriage and divorce under the Native Adat Marriage Electronic System (NAMES). This is an administrative system for the registration of native marriage and divorce under the Adat. The system was initially to record, manage and monitor marriage and divorce under Adat. The system is accessible to all District Offices and Sub-District Offices. The access has been extended to Jabatan Pendaftaran Negara (JPN) for verification of marital status of any native person wishing to solemnize his or her marriage under Law Reform (Marriage and Divorce) Act,1976.
Digital Initiatives
Tuan Speaker, MAIS participates in the Sarawak Government Digital Initiative. In this regard, MAIS has completed the upgrading of NAMES to Native Marriage Electronic System version 2 (NAMESv2) in May 2023. This new version enables the public to fill in the personal details and Surat Pengesahan Perkahwinan Ketua Kampung or for verification purposes by the District and Sub-District Office.
NAMESv2 is now one of the State services available through the Sarawak Government Portal. NAMESv2 possesses a comprehensive data on Adat Marriage and Divorce in Sarawak. Since June 2023, NAMESv2 has processed 645 Adat Marriage Registrations. In line with this new Digital Initiative, MAIS would continue to support the users by conducting trainings for all District and Sub-District Offices.
Dissemination of Adat
Tuan Speaker, dissemination of knowledge in Adat is very important and crucial for the survival and development of Adat. At the moment, MAIS is providing basic training of Adat to the Ketua Masyarakat and Ketua Kaum (KMKK) and also associations, e.g., Dayak Bidayuh National Associations (DBNA) and Sarakup Indu Dayak Sarawak (SIDS). MAIS has been engaged by Leadership Institute to give talk on Adat for Effective Execution of Legal and Statutory Functions in Resident and District Offices since 2022. In line with the proposed transformation and elevation of the Native Courts of Sarawak, MAIS may be required to organize professional teaching and training of Adat to lawyers who want to practice in the Native Courts of Sarawak. In this regard, MAIS would be seeking collaboration with local or foreign institutions of higher learning to formulate the module and syllabus on the jurisprudence of Adat. This could be a major challenge and task for MAIS in the future.
Establishment of Institute of Adat Sarawak
Since its establishment 46 years ago, the Majlis has no proper agency such as a department or an institution to support it. ln view of this challenges, the Majlis is planning to establish a supporting agency to assist in discharging its duties and functions. This proposal would be implemented through the amendment of the Majlis Adat Istiadat Sarawak Ordinance,1977. Barring any untoward event, the Bill may be table next year.
Issues and Challenges
Tuan Speaker, I wish to inform this august House regarding some challenges faced by certain Adat in some Bidayuh communities.
There are issues faced by some Bidayuh communities with regard to the rights of burial of the dead in the village or church cemetery. Most of the cemeteries in the Bidayuh communities are administered by the Kampung Church Committee. The old Adat practiced by most Bidayuh community was that every Bidayuh has the rights to be buried in the cemetery of his or her ancestral kampung when he or she died according to Adat Deya Tarih Pasid. I hope I pronounce the word correctly. The place where his or her ancestor umbilical cords were buried is regarded as the ancestral kampung of every Bidayuh. However, now, the authority to decide the right of burial is in the hand of Kampung Church Committee, which overrides the authority of the Ketua Kampung and Adat Deya Tarih Pasid. According to the the current practice, only members of the Church are entitled to be buried in the kampung or Church cemetery. Otherwise, they are not entitled to be buried in the kampung or Church Cemetery. As such, Adat Deya Tarih Pasid is no longer relevant for the regulation of burial of the dead. This has caused a lot of burial problems and anxiety in some Bidayuh communities bearing in mind the period for managing and arranging the burial of the dead is very short.
For the information of the Members of this august House Adat Deya Tarih Pasid is quite similar to Adat Temuni (umbilical cord rule) in some other native communities. This Adat states that a person has the right to be buried in the land where his/her temuni (umbilical cord) was buried, i.e. place of birth.
Tuan Speaker, MAIS has organised a round-table discussion with the Rt Reverend the Archbishop of the Catholic Church and the representative of the Rt Reverend the Bishop of the Anglican Church of Sarawak and Brunei to resolve the issue with a view to resuscitate Adat Deya Tarih Pasid.
The Archbishop of Catholic Church stated in principle that if the land in which the cemetery was situated was registered in the name of the Archbishop, then only members of the Catholic can be buried in that cemetery. If the land was not registered under the Archbishop’s name, the rights to be buried in the cemetery' would be decided by JKKK and the Kampung Church Committee.
With regard to the Anglican Church,the Church’s representative stated the issues could have arisen due certain approach or stand taken by the JKKK and Kampung Church Committee. The Anglican Church seemed to prefer that JKKK and the Church Committee would decide on the rights of burial in the kampung cemetery. As there has been no clear or definite decision made and endorsed in writing by the parties involved following the discussion, this issue is still far from settled and more follow-up discussions would be organised.
Importance of Adat
Tuan Speaker, now I wish to share my thought on the importance of Adat in the up-bringing and regulation of native societies. I think that an “ideal” native society could be created through the administration and compliance of Adat. Such society is not a perfect society or an Utopian society. An ideal native society is where peace, harmony, unity, and moderation prevail in that society. The period of peace, harmony, unity, and moderation could provide a conducive condition which may turn to provide some opportunities for members of the society to create relative prosperity, well-being, and search for knowledge and wisdom. Moderation is the self-restraint of thought, conduct and behaviour and the norm for any act or omission to control extremism. Whenever, a dispute arises between members of a society it would be resolved amicably. If a dispute cannot be resolved in such manner, it could be adjudicated in a competent forum such as a Native Courts.
Now, Tuan Speaker, I would like to proceed on matters relating to the Native Courts of Sarawak.
The Restructuring and Elevation of The Native Court of Sarawak
Now I would like to take this opportunity to enlighten Members of this august House on the proposal by the GPS State Government to restructure and elevate the status of the Native Courts of Sarawak. I would like to begin by stating that the very idea of restructuring and elevating the Native Courts was mooted by our Yang Amat Berhormat Premier himself during his address at the 25th Anniversary Dinner of the Office of the Chief Registrar, Native Courts of Sarawak on 24th August 2018. The mandate by Yang Amat Berhormat Premier was to commission a study to come up with a Master Plan to restructure and elevate the current Native Courts of Sarawak to be an autonomous and independent judicial institution like our Civil Courts and Syariah Courts.
Tuan Speaker, a team of local Consultants comprising former civil servants and administrators, practicing lawyers, academicians, and experts on local Adat were appointed by the State Government to carry out a study in January 2020. The study would have been completed within the original nine-month contract period had it not been for delays due to factors beyond the control of both the Government and the Consultant particularly those caused by the COVID-19 pandemic. The study was only completed in February 2022. The Consultant submitted their Final Report containing the Master Plan for the restructuring and elevation of the Native Courts to the State Government or Sarawak Government on March 2023.
Tuan Speaker, I am pleased to inform this august House that the Master Plan on the transformation of the Native Courts which I have just mentioned had been presented to the Majlis Mesyuarat Kerajaan Negeri (MMKN) in July this year. The Master Plan had been duly considered and approved by the MMKN for implementation and this would now pave the way for the State Government to commence the transformation involving an organisational restructuring and elevating the status of our Native Courts.
Based on the recommendations in the Master Plan, the current Native Courts will be restructured and elevated from being just a Unit under the Premier's Department to be a full-fledged judiciary which is independent and autonomous.
The other major changes would involve the hierarchy and organisational structure of the current native court system. In terms of court hierarchy, the recommendation is to restructure our current six-layer court to a four-layer structure comprising the Native Magistrates Court and the Native High Court. The Native High Court would comprise of three layers namely the Native High Court, Native Court of Appeal and Native Supreme Court.
For these changes to take effect, the recommendation in the Master Plan is for the Government to repeal the current Native Courts Ordinance, 1992 and Native Courts Rules, 1993 and to enact a new Native Courts Ordinance and new Native Courts Rules. The functions, powers and jurisdiction of the new Native Courts will be spelled out in the new Native Courts Bill which will be tabled at this Dewan. At this juncture, our target is to table the New Native Court Bill during the next sitting of this august House.
Tuan Speaker, under the proposed restructuring of the Native Courts, the District Officers and Residents will be relieved of their statutory and judicial duties to preside over cases before the Native Courts. It is the intention of the State Government to appoint legally qualified persons to serve as full-time Magistrates and Judges under the new Native Courts.
The proposed restructuring and elevation of the Native Courts would also involve some changes to the roles and functions of our Headman and Community leaders who are now the Presiding Officers of the Headman, Chiefs and Chiefs Superior Courts or the community level courts under the present structure. At this moment, the Headman or Ketua Kaum appointed by the Government are presiding over cases at the Headman Courts while the Community Leaders namely Penghulus, Pemancas and Temenggongs are presiding over cases at the Chief and Chiefs Superior Courts.
While the Ketua Kaums and Community Leaders would continue to perform their roles as custodians and administrators of the adat, they will no longer to be part of the formal new native court system as Presiding Officers. However, some of them will be involved and appointed as the Council of Elders to assist the Magistrates at the Native Magistrates Courts and Judges of the High Native Courts.
Tuan Speaker, the Master Plan for the restructuring and elevation of the Native Courts of Sarawak have been produced and recently approved by the Government due to the support, contribution, and the commitment of various parties.
In this regard, I would like to take this opportunity to thank members of the Study Steering Committee which is chaired by Yang Berhormat Datuk Amar Douglas Uggah Embas, Deputy Premier and Member for Bukit Saban, the Technical Committee headed by the State Attorney General, the Study Secretariat at the Office of the Chief Registrar, Native Courts Sarawak as well as the Consultant Team for their ideas, inputs, dedication and commitment in producing the Master Plan.
Due to the contribution and commitment of all involved, the State Government now have a Master Plan to restructure and elevate, albeit to transform our Native Courts, to be an independent and autonomous judiciary which will be respected and meets the aspiration of the Government.
Now Tuan Speaker, I would like to respond to the issues raised by Ahli-ahli Yang Berhormat during the debate during the Second Reading of 2024 Budget Bill relating to Unit Pentadbiran (UP) and Unit Pengurusan Imigresen dan Buruh (ILMU).
Bangunan Pejabat Daerah Kecil Nanga Budu
Untuk makluman Ahli Yang Berhormat bagi Krian, status terkini pembinaan Pejabat Daerah Kecil Nanga Budu yang baharu dalam proses pra-kontrak (Pre-contract Stage) iaitu penyediaan reka bentuk bangunan terperinci dan dokumen tender. Tender dijangka akan dikeluarkan pada suku pertama tahun 2024. Tempoh pelaksanaan projek ialah 18 bulan.
Untuk pembinaan Service Quarters Daerah Kecil Nanga Budu termasuk di dalam senarai Projek Pembinaan Service Quarters dan Bangunan Pejabat Kerajaan Sarawak yang telah diluluskan dalam Kajian Separuh Penggal RMK-12. Pembinaannya dijangka bermula pada pertengahan tahun 2024.
Pada masa ini, Pejabat Daerah Kecil Nanga Budu telah beroperasi di bangunan Kuarters Kerajaan secara sementara sejak 2 Januari 2023.
Kuarters Daerah Bukit Mabong
Untuk makluman Ahli Yang Berhormat bagi Baleh, Kerajaan masih dalam proses untuk mengenal pasti tapak bagi pembinaan Service Quarters di Daerah Bukit Mabong. Antara faktor yang diambil kira dalam menentukan tapak tersebut ialah keberadaan kemudahan jalan raya, bekalan air dan bekalan elektrik.
Kompleks Pentadbiran di Daerah Lingga dan Daerah Kecil Maludam
Untuk makluman Ahli Yang Berhormat bagi Lingga, projek pembinaan Kompleks Pusat Pentadbiran Daerah Lingga dan Daerah Kecil Maludam tersenarai di dalam Projek Pembinaan Service Quarters dan Bangunan Pejabat Kerajaan Sarawak yang telah diluluskan dalam Kajian Separuh Penggal RMK-12. Status projek pada ketika ini dalam proses mengenal pasti tapak yang sesuai untuk mendapat kelulusan Majlis Perancangan Sarawak dan pembinaannya dijangka bermula pada akhir tahun 2024.
Bagi pejabat lama Daerah Kecil Maludam, Jabatan Kerja Raya Sarawak telah diminta untuk menjalankan penilaian kondisi bangunan bagi menentukan tahap kerosakan dan status keselamatan bangunan tersebut.
Bangunan Pejabat Pertanian Daerah Simunjan
Untuk makluman Ahli Yang Berhormat bagi Simunjan, Kerajaan memang berhasrat untuk menempatkan ruang bagi Pejabat Pertanian Daerah Simunjan yang baharu di Pusat Pentadbiran Kerajaan Sarawak Daerah Simunjan. Projek pembinaan Pusat Pentadbiran Kerajaan Sarawak Daerah Simunjan tersenarai di dalam Projek Pembinaan Service Quarters dan Bangunan Pejabat Kerajaan Sarawak yang telah diluluskan dalam Kajian Separuh Penggal RMK-12. Status projek pada ketika ini dalam proses mengenal pasti tapak yang sesuai untuk mendapat kelulusan Majlis Perancangan Sarawak dan pembinaannya dijangka bermula pada akhir tahun 2024.
Pemantapan Peranan Jawatankuasa Kemajuan dan Keselamatan Kampung (JKKK)
Bagi isu yang dibangkitkan oleh Ahli Yang Berhormat bagi Daro, iaitu berhubung dengan cadangan untuk memperkasakan peranan dan fungsi JKKK melalui modul latihan dan pendidikan, Kerajaan telah menjalinkan kerjasama dengan pelbagai pihak, termasuk agensi-agensi Persekutuan seperti Kementerian Kemajuan Desa dan Wilayah (KKDW), Institut Kemajuan Desa (INFRA), Jabatan Kemajuan Masyarakat (KEMAS), dan agensi-agensi negeri seperti Pejabat Residen dan Daerah dalam melaksanakan pelbagai program-program untuk memberikan pendedahan dan pembangunan JKKK di Sarawak.
Pada tahun ini, sebanyak 52 program telah dilaksanakan yang melibatkan seramai 3,795 ahli JKKK Sarawak, dengan tumpuan kepada pemerkasaan kepimpinan desa, keusahawanan wanita, modul integriti, kecemerlangan belia, pemerkasaan biro, kit pertanian, agroekologi, pelan tindakan strategik desa, pengurusan bencana, penilaian bantuan, serta seminar dan simposium bertujuan meningkatkan kemajuan dan pembangunan di peringkat kampung.
Cadangan Kenaikan Gaji Ketua Masyarakat dan Elaun Ketua Kaum
Bagi isu yang dibangkitkan oleh Ahli Yang Berhormat bagi Tebedu, Serembu, Lingga, Tellian, Opar, Pelagus, Tamin, dan Beting Maro, iaitu berhubung dengan cadangan kenaikan gaji bagi Ketua Masyarakat dan elaun bagi Ketua Kaum.
Untuk makluman Ahli-ahli Yang Berhormat, kali terakhir Kerajaan Sarawak membuat penyelarasan gaji bagi Ketua Masyarakat dan elaun bagi Ketua Kaum adalah pada tahun 2018. Ketua Masyarakat dan Ketua Kaum memainkan peranan yang sangat penting dalam membantu Kerajaan menyampaikan maklumat berkaitan polisi dan dasar-dasar terkini Kerajaan di peringkat akar umbi.
Kerajaan juga mengambil maklum akan peningkatan kos sara hidup dan peranan serta tanggungjawab Ketua Masyarakat dan Ketua Kaum yang semakin bertambah. Oleh demikian, Kerajaan akan mengkaji dan meneliti secara terperinci keperluan ini bagi 7,585 Ketua Masyarakat dan Ketua Kaum di seluruh Sarawak.
Penambahan Jawatan Ketua Masyarakat dan Ketua Kaum
Bagi isu yang dibangkitkan oleh Ahli Yang Berhormat bagi Tanjong Batu, Tellian, Bukit Semuja dan Batu Danau iaitu berhubung dengan cadangan untuk penambahan jawatan Ketua Masyarakat dan Ketua Kaum.
Untuk makluman Ahli Yang Berhormat, Kerajaan setakat ini telah menerima sebanyak 876 permohonan cadangan pewujudan jawatan baharu Ketua Masyarakat dan Ketua Kaum (KMKK) dari semua Bahagian di seluruh Sarawak. Setakat ini, Kerajaan sedang meneliti secara terperinci keseluruhan permohonan pewujudan jawatan tersebut berdasarkan keperluan serta kriteria-kriteria umum pewujudan jawatan baharu Ketua Masyarakat dan Ketua Kaum.
Isu Elaun Ketua Kaum Diberhentikan dan Pengiktirafan Ketua Kaum Yang Mempunyai 20 Pintu Ke Atas
Bagi isu yang dibangkitkan oleh Ahli Yang Berhormat bagi Ngemah, iaitu berhubung elaun bagi Ketua Kaum yang diberhentikan, Kerajaan telah menetapkan bahawa bagi Ketua Kaum yang telah dilantik selepas Merdeka (1963) dan mempunyai rumah panjang/ kampung di bawah seliaan beliau kurang dari 10 pintu atau rumah, pembayaran elaun bulanan harus dihentikan.
Manakala, bagi pengiktirafan pelantikan Ketua Kaum selepas tarikh 17 Februari 2000, Kerajaan telah menetapkan Ketua Kaum tersebut hendaklah mempunyai rumah panjang atau kampung di bawah seliaan beliau dengan jumlah 20 pintu ke atas.
Application for Native Status
On the issue raised by the Honourable Member for Ba’Kelalan, currently there are two ways implemented by the Sarawak Government to deal with the application for native status. Firstly, prior to the coming into force of the Interpretation Amendment Ordinance, 2022 on 1st November 2023 the native status would only be granted through an application to be deemed native before the Resident Native Court pursuant to the Native Courts Ordinance, 1992. It is a lengthy process, and the applicant must fulfil certain conditions and requirements provided for under the Native Courts Rules, 1993 such as proficient in the language or dialect of that native community and he practises or conforms to the customs and culture of that native community that he wants to be identified with.
Secondly, with the coming into force of the Interpretation Amendment Ordinance, 2022 on 1st November 2023, the Sarawak Government has simplified the conditions, requirements, and processes for such person to be recognised as a native under the Amendment Ordinance. This is to ensure that they are suitable, reasonable, and practical as compared with the conditions, requirements, and processes under the previously mentioned Native Courts Rules, 1993.
In order for the Applicant to be recognised as a native of Sarawak under the Interpretation Amendment Ordinance, 2022, the Applicant must satisfy the conditions and requirements imposed by the Sarawak Government. The conditions imposed are:
(a) The Applicant must be a Malaysian citizen; (b) The Applicant is a natural born child of a native of Sarawak; and (c) One of the Applicant's parents is a native of Sarawak. Very simple, isn’t it? The Applicant is also required to submit their application at any District Office throughout Sarawak. Must be submitted to the District Office. This will include newborn babies where the application can be made by one of his natural parents. Therefore, the requirement for such person to make an application to be recognised as a native is necessary as the Government has the responsibility to ensure that only genuine application is processed and considered to safeguard the special position and rights of a native of Sarawak as enshrined in the Federal Constitution. Every application will be processed with due diligence. The fee of RM100 will still be imposed as a processing fee for the application and the issuance of the certificate.
Having said the above, I wish to inform that the conditions, requirements, and processes for application to be deemed as a native before the Resident Native Court under the Native Courts Rules, 1993 still apply to a non-native child adopted by native parent(s) and also to an application for non-native spouse(s) of a native person.
Delivering Better Services through Digitalisation
On the issue raised by the Honourable Member for Tupong. In supporting the Digital Transformation Plan under the Digital Government Services as outlined in Sarawak Post COVID-19 Development Strategies 2030 (PCDS 2030), the Sarawak Government through the Immigration and Labour Management Unit, Premier Department is in the process of developing a holistic and comprehensive platform to ease the process of recruiting local and foreign workers in Sarawak. It's started from the job advertisement process until the recruitment of successful employees.
The Foreign Worker Transformation Approach (FWTA) system that we developed are complies with security measures in terms of data gathering, storage, usage, and producing or generating computer files (documents) for official purpose. Other than that, the FWTA platform is seamless in the workflow and processing of the applications and approval.
This system is expected to be deployed in the year 2024 and the initial key functions and features consist of job advertisement, Approval in Principle (AP) applications, health monitoring and enforcement and tracking. The FWTA system will be incorporated with SarawakID and SarawakID Corporate for user access control and it will have an audit trail to ensure transparency in practice.
This system will be integrated with other existing systems under a similar subject or category to support the ecosystem from identifying the talent pool, and skill set requirements to the job matching process and job-hunting activities for Sarawakian employees and employers. Continuous improvement and continuous value added, and value creation will be included in this system from time to time in accordance with the current trend and the state’s requirement to control, monitor and coordinate supply and demand for human resources in Sarawak.
While we are focusing on improving our service delivery, we are also indirectly conducting an exercise on developing our big data initiatives, and in the near future, I believe that through the data analysis, we will know what to tackle and what to prepare in order to achieve our mission to become a high-income State in year 2023.
Immigration Autonomy on Permanent Resident
Bagi isu yang dibangkit oleh Yang Berhormat Meradong, bagi setiap permohonan permit masuk bagi warganegara asing di Sarawak adalah di bawah kawal selia oleh Jabatan Imigresen Malaysia Sarawak di bawah Seksyen 10 Akta Imigresen 1959/63; Immigration Prohibition Order Schedule (Perenggan 3,4 & 5); Pekeliling Imigresen Terhad Bilangan 16/2009 bertarikh 15 Disember 2009 dan Peraturan 4, Peraturan-Peraturan Imigresen 1963.
Permohonan permit masuk di Sarawak perlu dihantar ke Jabatan Imigresen Malaysia, Sarawak. Proses tapisan keselamatan akan dilakukan oleh Jabatan Imigresen dan Polis Diraja Malaysia. Kerajaan Sarawak yang bertindak sebagai Pihak Berkuasa Kerajaan Negeri akan memberi sokongan atas permohonan yang lengkap iaitu Seksyen 65(1) Akta Imigresen 1963 untuk diangkat kepada Ketua Pengarah Imigresen Malaysia berdasarkan Pekeliling Imigresen Malaysia Terhad Bilangan 16/2009. Bagi permohonan yang tidak Berjaya, boleh membuat rayuan kepada pihak Kementerian Dalam Negeri (KDN) melalui Kerajaan Sarawak dalam tempoh 30 hari dalam tarikh surat keputusan.
Tuan Speaker, I would like to respond to the issues raised by Ahli Yang Berhormat DUN Bukit Assek dan DUN Beting Maro during the second reading of 2024 Budget Bill.
Low Completion Rate Of Rtp Projects For Dun Bukit Assek
For the information of the Honourable Member for Bukit Assek, for the years 2022 and 2023, a total of 72 RTP projects have been approved for the Bukit Assek state constituency (DUN Bukit Assek) with a ceiling of RM10 million. The implementation status of the 72 projects as at 24 November 2023 is as follows:
(a) 51, namely 70.8% of projects with the status In Planning (DPr); (b) 4, namely 5.6% of projects with the status On Schedule (IJ); and (c) 17, namely 23.6% of projects with the status Completed.
For the information of the ADUN for Bukit Assek, the large number of projects not yet implemented is because these projects were only approved in 2022 and 2023. Other reasons why these projects have not yet been implemented are as follows:
(a) in the process of project amendment; (b) in the process of site preparation; (c) in the process of obtaining approval from the Ministry of Education Malaysia; and (d) in the process of balloting.
The Sarawak Government is always attentive to the needs of the people and is committed to developing rural areas to ensure that rural residents do not fall behind in enjoying the tide of development through the provision of infrastructure facilities, utilities and social amenities.
In this regard, the cooperation of all the parties involved, particularly the Divisional and District Administration, the YB ADUN, implementing agencies, the Village Development and Security Committee (JKKK) and related agencies, is the main contributor to the success of the implementation of RTP projects in ensuring that these projects can be carried out and completed as planned.
Sick Project (Behind Critical Schedule) DUN Beting Maro
Mr Speaker, for the information of the Honourable Member for Beting Maro,
Beladin Fisherfolk Housing Scheme
First of all, I would like to inform you that the RGC Project falls under the purview of the Ministry of Food Industry, Commodities and Regional Development (M-FICORD) based on The Ministers of The State Government Assessment Portfolio No. 2 Order 2022.
With regard to the Beladin Fisherfolk Housing Scheme project, the Land Custody and Development Authority (LCDA) is the implementing agency for the project. As the Honourable Member is aware, the Beladin Fisherfolk Housing Scheme project is a joint venture project between the Sarawak Government and the Federal Government. So far, a total of 300 units of the Semop Fisherfolk Housing Scheme and 68 units of the Beladin Fisherfolk Housing Scheme have been completed.
The completed housing units will be handed over to the beneficiaries after the Government finalises the ownership mechanism and the list of beneficiaries. To ensure that the houses are fit and safe for occupancy, the Sarawak Government, through the implementing agency, will carry out repair works before the houses are handed over to the beneficiaries. In this regard, the Sarawak Government has applied to the Federal Government for allocation for that purpose.
Beladin Fish Landing Complex – Beladin Fisheries Development Authority or LKIM Beladin
The LKIM Beladin Fish Landing Complex has been fully completed and was handed over to LKIM on 16 June 2022. LKIM Sarawak is currently in the planning phase for the implementation of rehabilitation works for the Beladin Complex. On 1 November 2023, the Malaysian Fisheries Development Authority (LKIM) placed one staff member at the complex for administration and operational matters. This complex was built temporarily pending the implementation of the rehabilitation works. At present, LKIM is trying to resolve issues related to the access road and utility facilities.
Beladin Fishermen's Mooring Jetty Project
With regard to the proposal to construct the Beladin Fishermen's Mooring Jetty, this project is a proposal from the Honourable Member for Beting Maro to be built at the Beladin Fisherfolk Housing Scheme using the Honourable ADUN's own allocation. So far, LKIM has not received any further directions from the Honourable Member for Beting Maro for the implementation of the jetty.
Pusa District Office Project, Betong Division
The Pusa District Office Project, Betong Division, is a Twelfth Malaysia Plan (RMKe-12) State Allocation project with a project cost of RM7.45 million. This project was awarded on 31 March 2023. However, the contract was terminated on 26 April 2023 due to the unsatisfactory performance of the contractor, with actual physical progress of only 22% compared with planned physical progress of 44.65%. The project is expected to be re-tendered in the first quarter of 2024.
New Construction of Food Court at RGC Beladin
The New Construction of Food Court at RGC Beladin is one of three new projects approved in July 2023 to replace the New Construction of the RGC Beladin Accommodation Complex Centre and the New Construction of the RGC Beladin Community Centre, which were approved in 2019.
This project has not been able to be implemented to date due to site issues, and the allocation approved is insufficient to meet the requirements of the project's design proposal. Since the existing allocation is insufficient, I have been informed that the Ministry of Public Health, Housing and Local Government (MPHLG) will propose that this project be implemented using other sources of allocation.
RGC Beladin Food Hawker Centre
The construction of the RGC Beladin Food Hawker Centre is a component under the RGC Beladin Phase II New Construction of R&R project. The centre is currently at the final stage and is expected to be fully completed by the end of December 2023. This project will be handed over to the Betong District Council for management and maintenance, and is expected to be fully operational as early as January 2024.
Pusa Village Multipurpose Hall, Betong
The construction of the Pusa Village Multipurpose Hall, Betong, was completed in October 2023. This hall is expected to be handed over to the Betong District Council after the processes of issuing the Certificate of Practical Completion (CPC) and Occupation Permit (OP) are completed in the first quarter of 2024. In conclusion, for the information of the Honourable Member for Beting Maro, efforts to monitor development projects for which the secretariat is entrusted to the Sarawak Implementation Monitoring Unit (SIMU) and the State Development Office (SDO), whether at State or National level, are being actively carried out through the mechanisms of the Sarawak Government's Monitoring and the Federal Government's Directive No. 1.
These are implemented through development or action meetings, zone meetings, site visits and intervention meetings held to ensure that the implementation of State and Federal development projects runs smoothly. This year, several meetings have been held at State level, namely the State Development Coordination Committee Meeting (SDCCM) chaired personally by the Most Honourable Premier of Sarawak five times. The State Development Action Meeting (MTPNg) chaired by the Honourable Datuk Amar Douglas Uggah Embas, Deputy Premier of Sarawak, once. The State Development Action Committee Meeting (JTPNg) chaired by the Honourable State Secretary of Sarawak four times, the Coordination and Monitoring Meeting for Sarawak Government Allocation Development Projects by zone, and the Coordination and Monitoring Meeting for People's Projects chaired by the Director of SIMU, eight and four times respectively. Moreover, ministries have also strengthened project monitoring at their respective ministry levels.
Meanwhile, the Divisional Development Committee (DDC)/ Divisional Development Action Committee (JTPB) chaired by the Resident, whose membership also involves the Honourable Members of the constituencies, also plays the role of the main monitoring agent for projects at the divisional level.
In this regard, members of the Committee must frequently go to the ground to ensure that the progress of project implementation runs smoothly and resolve issues arising at the divisional level as decided in the SDCCM chaired by the Most Honourable Premier of Sarawak and secretariat-managed by SIMU.
Before I conclude, I want to take this opportunity to once again thank the Honourable Members for the issues and concerns pertaining to my portfolio. I would also like to extend my heartfelt thanks to the agencies of the Premier's Department of Sarawak, namely the Sarawak Native Court, the Sarawak Customs and Traditions Council (MAIS), the Sarawak Implementation Monitoring Unit (SIMU), the Administration Unit; and the Immigration and Labour Management Unit for the dedicated efforts and cooperation of the agencies' officers in providing input and this winding-up speech of mine.
With this opportunity, I also wish to extend Merry Christmas to those of the Christian faith and Happy New Year to all. To close my winding-up speech, I would like to end with a pantun:
From Beladin going to Pusa, Buying puffer fish and returning the same day, Let us practise living in cooperation, Rather than pointing fingers at one another.
Thus, I hereby support the Supply Bill (2024), 2023. Thank you.
Thank you, the Honourable Minister Dato Sri John Sikie, for the winding-up just now. With this, I would, with all due respect, like to invite the Honourable Dato Sri Lee Kim Shin, Minister of Transport, to deliver the winding-up speech.
Terima kasih, Tuan Speaker. Selamat petang, Salam sejahtera dan Salam Sarawak Maju Makmur. First and foremost, I would like to congratulate Tuan Speaker on his re-appointment as the Speaker of this Sarawak Legislative Assembly for another term of two years from 16th November 2023 to 15th November 2025. This is a testimony of his able leadership in maintaining the excellence conduct and decorum of this august House as well as upholding the Standing Orders of the Sarawak State Legislative Assembly throughout his service.
Tuan Speaker, I extend my heartfelt congratulations to the Right Honourable Premier of Sarawak who was recently conferred with the distinguished Honorary Fellow Award by the Asean Federation of Engineering Organisations (AFEO) on 22nd November 2023 at the 41st Conference of the Asean Federation of Engineering Organisations at Bali, Indonesia. This prestigious commendation is a reflection of the Right Honourable Premier’s tireless efforts, innovative thinking and unwavering commitment to develop Sarawak.
It also acknowledges the dynamic and progressive leadership demonstrated by the Right Honourable Premier in the global context, and especially in the ASEAN region. The exemplary achievements and leadership qualities of the Right Honourable Premier will continue to inspire our future leaders and the younger generation to possess great self-belief, envision a purpose, and move in the right direction to sustain the socio-economic development of Sarawak.
GPS Winning By-Election N.67 Jepak
Tuan Speaker, I would also like to take this opportunity to record my congratulations to the Gabungan Parti Sarawak (GPS) under the leadership of the Right Honourable Premier for the landslide victory of the By-Election N.67 Jepak on 4th November 2023. GPS once again retained DUN N.67 Jepak by securing 9,638 votes to win with a majority of 8,784 votes. This indicates that the people of Jepak have confidence and trust in the current Government led by our Right Honourable Premier in bringing development to Jepak and Sarawak as a whole.
To Ahli Yang Berhormat for N.67 Jepak, I would like to welcome him to this august House, representing the people of N.67 Jepak to carry out their hopes and aspirations for more development for Jepak.
Belanjawan 2024 Malaysia Madani (Federal Budget 2024)
Tuan Speaker, the Belanjawan 2024 Malaysia Madani themed “Economy Reforms, Empowering The People” (Reformasi Ekonomi, Memperkasakan Rakyat) allocated RM303.8 billion for operating expenditure and RM90.0 billion for development expenditure.
Nonetheless, despite the huge amount of the development budget, the Federal Government has only allocated RM5.8 billion for Sarawak’s development expenditure. I believe Sarawak deserves more funding in view of the development needs as well as its huge contribution to the national economy. Hence, I fully support the Right Honourable Premier’s request for the Federal Government to provide more allocation to Sarawak. I also appeal for the Federal Government to provide more allocation for the development of the transport sector in Sarawak.
Supply Bill, 2024
Tuan Speaker, I would like to congratulate the Right Honourable Premier for his forward-thinking and people-centric budget with the theme Development for All: Together, Building a Prosperous, Sustainable and United Sarawak. This budget reflects GPS Government’s commitment to steer Sarawak into a well-developed status through economic growth strategies while prioritising the well-being of our people and securing a bright future for our children.
The development-oriented budget with a projected surplus of RM386 million is a testament of prudent financial management. This instils confidence in the effective utilisation of resources for the betterment of our people and the sustained development for Sarawak. In addition, I applaud and fully support the initiatives for human capital and talent development as announced by the Right Honourable Premier in the budget. The four key initiatives will further enhance our students’ and professionals’ access to education and skill development programmes that act as catalysts for personal and professional development. Henceforth, Sarawak’s younger generation will be encouraged and motivated to acquire skills and knowledge to upgrade their living standard. This is certainly critical for Sarawak to attain high income and developed status by 2030. As the saying goes, “If you give a man a fish, you feed him for a day. If you teach a man to fish, you feed him for a lifetime”.
The GPS Government will continue to provide opportunities for upward mobility to the rakyat by investing in education, training and talent development. These are crucial for fostering sustainable economic growth, societal progress, improving health and individual well-being, and reducing income inequality.
I am fully supportive of the Supply Bill presented by the Right Honourable Premier. As my Ministry progresses with the development of Sarawak, it is hoped that more allocation will be provided for the transport sector in the future.
Passing of Bills 2023
Tuan Speaker, with this opportunity, I also wish to congratulate our GPS Government for introducing five Bills during this sitting. Two of the Bills, namely the Sarawak Ombudsman Bill, 2023 and the Environment (Reduction of Greenhouse Gases Emission) Bill, 2023 are the first of its kind in Malaysia. I believe the smooth approval of the Bills by this august House reflects the stability and unity of our GPS Government.
The Sarawak Ombudsman Bill, 2023 would enable our GPS Government to uphold governance, transparency and integrity. These are the key elements for the Government to practice in order to ensure efficiency in public service administration.
Meanwhile, the Environment (Reduction of Greenhouse Gases Emission) Bill, 2023 showcases Sarawak’s commitment to reduce greenhouse emissions in line with the objective to combat climate change and to achieve carbon neutrality by 2050 in accordance with the Paris Agreement. I believe this Bill will be a guiding policy in our efforts to develop an environmentally friendly transport system in Sarawak.
With the introduction and implementation of these Bills, we hope Sarawak will continue to prosper and embrace sustainable development without compromising resources for future generations.
Global Direction For Transport Sector
Tuan Speaker, on global scale, the transport sector is increasingly aligned with sustainable goals, notably the target of achieving net-zero emissions by 2050. This commitment reflects a collective global effort to address environmental concerns and create a more sustainable future.
The Aichi 2030 Declaration on Environmentally Sustainable Transport, adopted by 22 countries, including Malaysia, signifies a regional commitment towards Sustainable Development Goals (SDG) and The Paris Agreement on sustainable development. This declaration emphasises the development of universally accessible, safe, affordable, efficient, clean, low-carbon, resilient and multi-modal passenger and freight transport systems in Asia.
In line with these global and regional initiatives, Malaysia has made a commitment to reduce carbon emissions in the transport sector with aims to reduce greenhouse gas emissions by 2030.
Under the leadership of the Right Honourable Premier of Sarawak, Sarawak Government is embarking on the transformation of Sarawak’s transport sector in harmony with these global directions to shape a socially inclusive and sustainable future for Sarawak.
Tuan Speaker,
Transforming Sarawak's Transportation Sector
Transport Sector as Enabler Towards High Income Economy and Developed Region by 2030
The Post COVID-19 Development Strategy (PCDS 2030) outlined very clear strategies for Sarawak to achieve high income economy and developed region by 2030, with a GDP value of RM282 billion supported by an average growth of 8% per annum. This growth will be driven by various economic sectors underpinned by aggressive utilisation of natural resources and infrastructure development.
Looking at many high income and developed regions or countries around the world, it is understood that “a developed region” is not merely defined by its high income level. Most developed regions are characterised by its advanced economy driven by industrialisation, high technology and innovation, research and development, and supported by advanced transport systems and related infrastructures, be it public transport, logistic hubs, ports, airports or marine and riverine transport.
Transport sector is the key enabler for economic growth and social integration. Hence it must be given high priority, be it in the form of policy direction, funding, planning and human capital. My Ministry is tasked with the responsibility to accelerate the growth of economic sectors particularly tourism, services, agriculture and mining, as well as to facilitate the smooth movement of people and goods. To achieve the 2030 vision, it is crucial for us to advance and modernise our transport sector with integrated planning, introduction of new technologies, supportive policies and strengthened transport entity.
Institutional and Policy
A strong institutional setting and clear policy direction are fundamental for an efficient transport management and its service delivery. The transport system is influenced by many factors under the purview of various agencies and authorities, both at Sarawak and Federal Governments level. To actualise the vision outlined in PCDS 2030, my ministry is engaging with all relevant stakeholders to revisit relevant laws and regulations. This is to facilitate necessary updates and changes to enable the development of the transport sector and achieve its aspiration of a safe, reliable, affordable and energy-efficient integrated transport system.
River Economy
Tuan Speaker, my Ministry has taken strategic steps to improve the navigational safety of Sarawak’s rivers to tap its economic potential. One of the initiatives taken is to study the navigability of Sungai Sarawak Kanan and from Kuching Waterfront to Siniawan. This study will map out the navigability of the river and recommend strategies to develop economic activities in line with the river economy concept. We must ensure safe navigation of our rivers to facilitate the movement of people and goods. This is critically important, as some of our settlements along the riverbanks are still dependent on the river as the key mode of transport. At the same time, it promotes river sports activities, enhances business, and trade. To achieve safer navigation, it is essential to eliminate hazards in the river, provide up-to-date river charts and strategically deploy a sufficient number of Aids to Navigation (AtoNs) across the rivers. Compliance with the International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA) standards is crucial to maintain and grow our riverine shipping industry.
Strengthening of Buoys and Lights
Tuan Speaker, for the information of this august House, the Sarawak Buoys and Lights Board was established under Clause 4(1) of the Merchant Shipping (Buoys and Lights) Regulations, 1961 made under Section 277 of the Merchant Shipping Ordinance, 1960.
Currently, the Sarawak Buoys and Lights Board does not have its own management structure set-up. The entity is administered by its Board of Directors whereby the function of the Board is performed by the Marine Department, Sarawak Region.
The Sarawak Buoys and Lights Board needs to be strengthened and transformed from its present status. It is very crucial and timely to ensure the effective management and delivery of buoys and lights services, expansion of revenue stream especially through the collection of buoys and lights dues, and most importantly to protect the sovereignty of Sarawak. Therefore, my Ministry is working closely with the Sarawak State Attorney General's Chambers to review and propose changes to the regulations. Our objective is to establish a robust management structure and provide adequate staffing for the Sarawak Buoys and Lights Board.
Integrated Transport Planning
Tuan Speaker, integrated transport planning is a comprehensive approach to establish a cohesive, seamless and sustainable transport network within the region. For land transport, key factors such as urban design, accessibility, settlements patterns, road and drainage construction, employment centres, socio-economic background and environmental considerations can significantly influence the efficiency and effectiveness of the transport system.
A critical aspect of integrated transport involves the harmonious integration of transport systems with key infrastructure components such as ports, airports and resource producing centres to enhance the efficiency of economic sectors and contribute to overall socio-economic advancement.
Furthermore, the integration of public transport with residential, commercial and industrial zones can greatly enhance accessibility and efficiency. The incorporation of transit oriented development (TOD) in urban planning can create vibrant and sustainable communities around transit hubs. This will result in well-connected communities that not only facilitate economic activities but also improve overall quality of life. A coordinated effort to understand and address these factors is essential for developing a transport system that caters for community needs while adhering to socio-economic and environmental considerations.
Considering these factors, my ministry has commissioned the study on the Sarawak Integrated Transport Master Plan and Urban Transport Action Plan to guide development direction and policy formulation to ensure a sustainable transport system in Sarawak amidst rapid urbanisation.
Active Mobility
Tuan Speaker, cities worldwide are increasingly focused on creating environments that support active mobility. This involves designing urban spaces with pedestrian-friendly infrastructure, dedicated cycling lanes and improved connectivity between various transport modes. Active mobility provides a range of benefits, including improved health, environmental sustainability, economic efficiency and social well-being. Investing in and promoting active transport infrastructure can contribute to the development of more sustainable, liveable and inclusive communities. In line with these principles, my Ministry is working closely with the relevant agencies to plan and build integrated bicycle lanes and pedestrian walkways at strategic areas to complement motorised transport modes and act as feeder to other modes of transport.
Advancement of Transport Infrastructures
Railway Infrastructure
Tuan Speaker, after our deliberation with the Federal Government, the Feasibility Study on Trans Borneo Railway is scheduled to take place next year under Rolling Plan 4 of the 12th Malaysia Plan. This feasibility study marks the beginning of our plan to advance land connectivity beyond our border, going through to Sabah and with potential links to Negara Brunei Darussalam and Kalimantan. It is envisioned as a catalyst to serve as a vital transport network by linking key economic centres, ports and airports in Sarawak and Sabah.
Logistics Hub
Tuan Speaker, the establishment of a logistics hub can significantly support economic growth by enhancing efficiency, reliability and cost-effectiveness of the movement of goods. These hubs play a crucial role in facilitating trade, connecting producers and consumers and elevating the overall competitiveness of businesses.
In developed countries, logistics hubs serve as a central point for storage and sorting to optimise the distribution of goods. This reduces transport costs, shortens lead times and enhances the overall efficiency of supply chains.
For this purpose, my Ministry is developing lorry terminals in major towns with Miri and Bintulu terminals as the pioneering projects. The lorry terminals with integrated facilities such as warehouses, storage, workshops and commercial space that align with modern logistics practices will contribute to economic growth, improved supply chain management and the overall development of the logistics and transport sector.
Airport Expansion
Tuan Speaker, according to the International Transport Forum (OECD), one of the determinants of air connectivity is airport infrastructure. Investment in airport infrastructure not only improves air connectivity but also radiates positive effects throughout the economy. Job creation, increased trade and a boost in tourism are among the dividends that can be reaped by nations that prioritise the development of this gateway.
For the information of this august House, an airport optimisation plan has been conducted and revealed that Kuching International Airport and Miri Airport have surpassed their capacities of 5 Million Passengers Per Annum (MPPA) and 2 Million Passengers Per Annum (MPPA), respectively, in 2019.
In this regard, upgrading the terminals is required to resolve current operational issues and congestion in certain areas and also to cater for future passenger growth whilst capitalising on new opportunities to spur economic growth in Kuching and Miri.
Sarawak’s Short Take Off and Landing Ports (STOLports) also require immediate action to address safety, cleanliness and facility concerns. These STOLports need to be revamped to enhance the overall passenger experience and ensure the long-term sustainability of these rural transport hubs.
Thus, it is timely to upgrade these airports, including STOLports, and we seek the Federal Government's approval for funding in the 5th Rolling Plan of the 12th Malaysia Plan.
Acquisition of MASwings
Tuan Speaker, Sarawak Government is taking significant strides in improving air connectivity with the acquisition of MASwings. I have led the taskforce created for this purpose and had engaged with the Ministry of Transport Malaysia, Khazanah Nasional Berhad and Malaysia Aviation Group. This has led to the signing of two Memorandum of Understanding (MOU), namely:
(a) MOU signing between the Sarawak Government and Federal Government on the 20th July 2023 regarding the Taking Over of Rural Air Services (RAS) by the Sarawak Government This agreement ensures that the RAS subsidy will continue after the takeover; and
(b) MOU signing between the Sarawak Government, Hornbill Skyways Sdn. Bhd. and Malaysia Aviation Group was held on 27th October 2023 on the acquisition of MASwings Sdn. Bhd. shares. Sarawak Government is currently conducting due diligence and further negotiation with Malaysia Aviation Group and Khazanah Nasional Berhad on the actual acquisition of the MASwings shares.
We firmly believe that the acquisition of MASwings is a strategic move to significantly enhance air connectivity within Sarawak and Sabah, fostering stronger ties with neighbouring regions and Asian countries. We anticipate that this acquisition and operation will play a key role in bridging the air connectivity gap, facilitate trade and investment, unlock Sarawak's tourism potential, attract human capital and generate a multiplier effect to boost Sarawak's economy.
Tuan Speaker, as we navigate the dynamic landscape of Sarawak’s development characterised by key projects and initiatives in the transport sector, our journey towards a sustainable and robust future is well underway.
To ensure the success of these endeavours, my Ministry is committed to implement strategies on policies, development, implementation, operation and development of a skilled workforce to cater for the unique needs of Sarawak.
Through concerted efforts with all relevant agencies, private entities and international partnerships, we aim to shape a transport sector that not only meets the immediate needs of Sarawak but also aligns with global sustainability standards. This will contribute significantly to the PCDS 2030 aspiration to foster economic growth, social inclusivity and environmental sustainability, propelling Sarawak into the future characterised by connectivity, efficiency and prosperity.
Land Transport And Logistic Sector
Progress of Kuching Urban Transportation System
Tuan Speaker, I am pleased to provide this august House with the latest developments of the Kuching Urban Transportation System (KUTS), with a particular emphasis on the Autonomous Rapid Transit (ART) project.
As of October 2023, the overall actual progress of KUTS Phase 1 stands at 14.43%. The capital expenditure has reached RM403.43 million, reflecting the financial commitment to advancing this transformative project. The groundwork for the Rembus Depot as the central hub for the ART system's operations and administration is ongoing. To date, the progress stands at 33.54% and it is scheduled to complete in the first quarter of 2024.
Tuan Speaker, several other tenders for KUTS Phase 1 project are at various stages. The tender for Rembus Depot and Associated Works was closed in September this year. The scope of works encompassed mechanical and infrastructure workshops, administration and operation control centre as well as a stabling yard. Subsequently, the tender for Red Line Package 1, including the scope of works for ART lane, stations, systems and utility works from Kuching Sentral to Pending was closed on October 2023.
In addition, the Blue Line Package 1 from Rembus to Stutong incorporating the Sg Kuap Bridge was awarded to Ibraco Construction Sdn Bhd, China Railway Engineering Corporation (M) Sdn Bhd and Nanyang Tunnel Engineering Sdn Bhd Joint Venture on 10th November 2023 with a contract sum amounting to RM 568.61 million.
Progress and Performance of Autonomous Rapid Transit Project and Proof-of-Concept
Tuan Speaker, a significant milestone was achieved on 4th August 2023 when the Prototype Hydrogen ART vehicle arrived in Kuching, marking a crucial step in the project's timeline. Subsequently, the Prototype ART Hydrogen vehicle underwent a successful two month engineering run at Isthmus in September and October this year. Throughout the engineering run stages, the Prototype ART vehicle has covered a total distance of 5,407 kilometres encompassing both its Stage 1 Engineering Run in China and Stage 2 at Isthmus.
The Engineering Run was inaugurated on 6th September by the Right Honourable Premier at Isthmus, Kuching and has since provided trial rides to more than 80 groups of over 2,000 riders, comprising Ministers and senior officers from both the Federal and Sarawak governments, including the Second Deputy Finance Minister, MITI Deputy Minister, both from the Federal Government, EU Ambassador, Penang's Chief Minister and delegation; and Selangor's Executive Councillor and delegation; as well as stakeholders from the private sector and non-governmental organisations. This inclusive approach ensured that diverse perspectives are contributed to the evaluation process.
This trial phase fulfilled its objective of gathering the necessary data especially for evaluating the ART vehicle's movement guidance system and the hydrogen fuel cell propulsion system. The acquired data is a crucial input for the ongoing design phase of the ART vehicle before it progresses to the mass production stage.
The Engineering Run at Isthmus concluded on 5th November, following which the prototype ART vehicle, along with all associated equipment and inventory, was mobilised to Samarahan on 17th November for the continuation of the Proof-of-Concept (POC) exercise.
The Proof-of-Concept or POC exercise commenced on 20th November on the dedicated 2.6 kilometre stretch of lane along the Kuching-Samarahan Expressway. This exercise provides an opportunity to assess the viability of the system in an actual operational environment as it simulates the testing conditions for the future of ART dedicated double lane under the KUTS project's Blue Line and Transit Signal Priority (TSP) at the junction.
The POC Exercise is expected to conclude by the end of this year. At the same time, the following tasks will be initiated:
(a) Commencement of works on Blue Line Package 1 from Rembus to Riveria starting on 1st December 2023; (b) Commencement of works on Red Line from Kuching Sentral to Pending in Q1 2024; (c) Green Line Infrastructure package is currently at design stage and work is expected to commence by Q3 2024; (d) The procurement of 55 feeder buses is targeted for re-tender in Q1 2024; (e) The Hydrogen Production Plant within Rembus Depot is targeted to tender in Q1 2024; and (f) The Feeder Bus Depot in Rembus Depot with the targeted tender by Q2 2024.
Performance of Hydrogen Bus Trial Operation
Tuan Speaker, the hydrogen bus trial operation has continued its commencement in September 2020. As of October 2023, the three units of buses have recorded a total of 46,374 passengers. The average monthly ridership for 2023 has notably surged to 1,832 passengers, marking a 38% increase from the previous year's average of 1,331 passengers per month. The increase is attributed to rising public awareness and active participation in special events, signifying the positive impact of these buses on local transport.
Public Transport and Urban Traffic Management
Tuan Speaker, my Ministry will continue to execute its mandated role in managing public transport and urban traffic by identifying and finding appropriate solutions on public transport issues. Collaboration of all parties including grassroot leaders is critical and vital to create an effective and efficient transport system in Sarawak particularly in addressing traffic congestion in urban areas and transport services in the rural areas.
Sarawak Road Safety Council
Tuan Speaker, the Sarawak Road Safety Council under my Ministry prioritises road safety as there is an imperative need for heightened awareness in Sarawak. Road accidents in Sarawak are indeed alarming. Based on the Royal Malaysia Police Department (PDRM) report presented during the Program Kolokium Penguatkuasaan Keselamatan Jalan Raya Tahun 2023 which was held on 20th November, Sarawak has recorded a total of 17,699 road accidents between January until October 2023. Out of these 17,699 road accidents, 301 are fatal accident cases with 349 deaths and 122 serious accidents. These figures contribute to the total of 495,698 reported accidents in Malaysia for the same period.
There are 27,793 cases of road accidents in 2022 compared to 20,788 cases in 2021 which shows an increase of 33.6%. Based on these statistics, motorcar vehicles recorded the highest number and accounts for more than half of the total number of cases, followed by four-wheel drive vehicles and motorcycles.
Therefore, continuous education and awareness campaigns as well as enforcement activities are critical road safety strategies to reduce accidents on the road. In this regard, my Ministry through the Council and collaboration with various stakeholders are implementing various awareness programmes and initiatives to increase public awareness on road safety. This includes the upgrading of the existing traffic gardens and the revival of traffic games.
Transport Awareness Behavioural Change (T-ABC) Programme
Tuan Speaker, in addition to road safety programmes, my Ministry is also addressing the traffic situation in school areas. This is part of the Road Safety Strategy that by educating the young children, they may influence their parents to be more responsible whenever they are on the road.
This year, my Ministry with the Resident Office have organised the Transport-Awareness Behavioural Change (T-ABC) Programme in Miri and Kuching division.
The programme targets young school children, parents and teachers with the objective to address road user’s behaviour and improve road safety. The same programme will be held in Sri Aman division tentatively in December this year.
Recognising the media’s influential role, we will continue and strengthen our collaboration with the media, enforcement departments and agencies to further educate the public on road safety.
Performance of RM1.00 Flat Rate Bus Fare Subsidy Programme
Tuan Speaker, since the implementation of this programme in May 2020, the ridership has increased from approximately 200,000 ridership per month in 2020 to an average of 350,000 ridership per month in 2023. This indicates a good response from the rakyat to use public bus transport for their daily commute particularly the B40 Group.
One of the positive impacts of this programme is that the number of stage buses operating in Sarawak has increased by 15%, from 107 buses in 2020 to 124 buses in 2023. With more buses on the road, commuters can expect shorter waiting times and more frequencies, making public transport a more reliable, convenient and attractive option.
In this regard, my Ministry is currently reviewing the implementation of the RM1.00 bus fare subsidy due to the increase in operating cost and expenditure of the programme. Therefore, this programme will be evaluated and a more effective model will be introduced for the rakyat.
Free School Bus Programme
Tuan Speaker, the implementation of the Free School Bus Programme which was introduced in July 2020 has benefitted students under the B40 group. It was recorded as of 31st October 2023 that a total of 6,334 students in 56 schools 23 in Kuching, six in Sibu and 27 in Miri Divisions participated in this programme.
The introduction of the digitalised electronic card, “My Yayasan System” in Kuching and Miri division this year has helped Yayasan Sarawak to track the actual number of students under the B40 group in this programme.
Implementation of Smart Traffic Lights
Tuan Speaker, one of the key initiatives to reshape our urban traffic management is by implementing the smart traffic lights using the Sydney Coordinated Adaptive Traffic System (SCATS) to significantly enhance transport efficiency and safety within the city.
The intelligent traffic lights are powered by real-time data and Artificial Intelligence (Al) allowing adaptive signal timing that reduces congestion, travel times and increases overall safety. Collaboration with city councils, transport agencies and law enforcement is fundamental to the success of this endeavour.
We are taking a phased approach, starting with selected junctions, ensuring a seamless integration that would not disrupt current traffic patterns. Presently, Sarawak boasts 164 SCATS traffic lights, with varying numbers managed by the Public Works Department (JKR) and the city councils such as Kuching North (DBKU) and Kuching South (MBKS) City Councils. Our plan is to expand this technology to cover more intersections, promising further improvements in traffic flow and safety.
Tuan Speaker, my Ministry remains committed to enhancing urban mobility to better serve the needs of the rakyat. This includes the ongoing improvement of public stage bus services as well as the accessibility and affordability of public transport for all income groups. Hence, my Ministry will continue to collaborate with all relevant agencies in the planning and development of Sarawak's transport sector to realise its transformational initiatives.
Riverine And Maritime Transport Sector
Performance of Riverine and Maritime Transport Sector
Tuan Speaker, let me highlight the progress and performance of the Maritime and Riverine Sector. My Ministry, through Sarawak Rivers Board and Sarawak Buoys and Lights Board is committed to stimulate river economy by upgrading various Aids to Navigations (AtoNs), and improving riverine infrastructures and landing facilities along our rivers. This initiative is aimed towards enhancing navigational safety and river transportation particularly for bulk goods. Given Sarawak's strategic location on the Northern shore of Borneo Island, situated on the east-west and south bound sea routes, we are determined to capitalise on this advantage to strengthen our economic growth through increased commerce along the sea routes.
Sarawak Rivers Board
Tuan Speaker, now, I would like to enlighten this august House on the key focus area and performance of Sarawak Rivers Board (SRB), an agency under the purview of my Ministry. As of October 2023, Sarawak Rivers Board has processed and approved 203 applications of permits consisting of 23 pipeline and cable laying, 31 water sports activities, 82 building of wharves, jetties and bridges, 43 riverbank reserve, 19 aquaculture and five applications for sand/ gravels extraction.
In ensuring river safety, Sarawak Rivers Board (SRB) is continuously carrying out river patrols in the 36 gazetted rivers to ensure river users comply with the rules and riverine good practice. To date, SRB has conducted 895 river patrols, 138 enforcement operations, 837 vessels and 181 premises inspections. A total of 34 compounds were issued.
River Safety and Cleanliness Campaign
Tuan Speaker, Sarawak Rivers Board is also carrying out regular River Safety and Cleanliness Campaigns with communities residing along rivers. During this campaign, agencies such as BOMBA, Medical Department, Natural Resources and Environment Board (NREB) and Department of Agriculture are invited to participate.
Recognising the importance of preserving our rivers, Sarawak Rivers Board consistently organises community programmes to clean-up rivers for safer navigation, recreational purposes and also ecological conservation.
This campaign plays a crucial role in raising awareness among local communities about the importance of keeping our rivers clean and safe. The programme instils the value of “I Love My River” in all communities in Sarawak and fosters a commitment to preserve rivers, particularly in areas with tourism potential. For this year, SRB has conducted 27 River Safety and Cleanliness Campaign programmes at various locations throughout Sarawak.
One such programme was held for over two days from 22nd to 23rd September in Mulu. The programme was organised in collaboration with the Marine Department Sarawak Region and an insurance company and it was attended by 84 tourist boat operators. During the programme, the boatmen and boat operators were briefed and reminded to adhere strictly to safety rules, regulations and procedures before embarking on any journey on the river. A strong emphasis was also placed on ensuring passenger safety, making it mandatory for all individuals travelling on the river to wear life jackets. Additionally, the programme facilitated the processing and approval of 19 River Transport Permits (RTP) and the renewal of 37 RTP.
Sarawak Buoys and Lights Board
Tuan Speaker, the Sarawak Buoys and Lights Board (SBLB), another agency under the purview of my Ministry, is responsible for the safety of navigation in Sarawak waters. For the information of this august House, the Sarawak Buoys and Lights Board is a member of the International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA).
Since 1995, the Sarawak Buoys and Lights Board has constructed and maintained seven lighthouses, 45 light beacons and 72 units of marker buoys. These Aids to Navigations (AtoNs) adhere to MS ISO 9000 standards by Lloyd's Registration, with compliance rates of the lighthouses at 99%, light beacons at 98% and marker buoys at 97% as per IALA Standards.
The Board is continuously upgrading the AtoNs in line with the latest technology to enhance shipping safety. This is important to further improve the shipping and maritime industries in Sarawak.
Tuan Speaker, the performance of Riverine and Maritime Sector is satisfactory with minimal accidents and no fatalities from boat accidents. There is a notable improvement of river cleanliness from human-induced pollution. Furthermore, the understanding and responsibility of local communities regarding the safety and cleanliness of rivers have also improved.
Air Connectivity And Aviation Industry
Performance of Sarawak Aviation Industry
Tuan Speaker, allow me to provide an update on the aviation sector. For the information of this august House, the total number of aircraft and passengers’ movement to all airports and STOLports in Sarawak from January until the third quarter of this year, are 97,129 aircraft movements carrying 7.8 million passengers. The flights are mainly from Kuala Lumpur, Kota Kinabalu, Johor Bahru, Penang, Kota Bharu, Labuan, Bandar Sri Begawan, Jakarta and Singapore.
For the same period, a total of 41,890 tonnes of cargo was transported. This cargo includes electrical and electronic goods, oil and gas equipment, e-commerce goods, dangerous goods which include flammable materials, perishable goods such as fruits and fresh flowers, and general cargo such as fabrics and clothing.
Malaysia Domestic Flights
For Malaysia domestic flights, after the suspension of MYAirlines operation on 12th October 2023, Sarawak received an average of 372 flights weekly from Kuala Lumpur, Kota Kinabalu, Johor Bahru, Penang, Kota Bharu and Labuan. The routes are now served by five airlines, namely Malaysia Airlines, AirAsia, Batik Air, Firefly and MASwings.
Kuching International Airport received the most flight frequency which is 183 flights weekly, followed by Miri Airport with 89 flights, Sibu Airport - 49 flights, Bintulu Airport - 32 flights, Mulu – seven flights, Lawas – two flights and Limbang with three flights respectively.
Flights within Sarawak
For Sarawak domestic flights, there are 624 flights weekly connecting Sarawak major cities, towns and rural settlements under Rural Air Service (RAS). Miri Airport handles the highest number with 189 flights weekly, followed by Kuching Airport with 144 flights, Sibu Airport - 63 flights, Bintulu Airport with 40 flights and the rest to smaller airports and STOLports respectively. The flight operations are operated by AirAsia, Firefly and MASwings.
International Flights
Tuan Speaker, as at November 2023, the international flights to Sarawak are recorded at 40 flights weekly; mostly from Singapore with 35 flights weekly, three flights weekly from Jakarta, Indonesia and two flights weekly from Negara Brunei Darussalam. Kuching International Airport receives 31 flights weekly, followed by Miri Airport with six flights and Sibu Airport with three flights respectively. The routes were served by AirAsia Berhad, AirAsia Indonesia, Malaysia Airlines Berhad, Scoot Tiger Airways and Royal Brunei Airlines.
For the information of this august House, AirAsia is set to suspend its flights for Singapore-Miri and Singapore-Sibu routes from February 2024, citing operational strategies. I have personally discussed this matter with the AirAsia management team, urging them to reconsider their decision or, alternatively, to reduce the frequency of these routes to meet the required load capacity; As of now, we await for concrete feedback from the management team.
On the other hand, I have also discussed with the management team of Singapore Airlines and Scoot Airlines in September, to increase Scoot Airlines frequency from Singapore to Kuching and Miri. During the discussion, Scoot Airlines had also agreed in principle to operate the route from Singapore to Sibu, tentatively planned to commence after the delivery of their new aircraft in 2024.
Suspension of MYAirline Operations
Tuan Speaker, MYAirline Sdn. Bhd. has ceased its six flights daily operation to Sarawak from Kuala Lumpur since 12th October 2023. We are indeed very disappointed with MyAirline's abrupt decision to suspend their flight operations. This has caused a great deal of inconvenience and unhappiness among passengers who have purchased their air tickets in advance until March 2024. It was estimated that approximately 24,260 passengers, inbound and outbound of Sarawak, were affected by the suspension. My Ministry deems it irresponsible of MYAirline management for failing to provide prior notice regarding the suspension.
My Ministry applauds the support and good works of The Malaysian Aviation Commission (MAVCOM), MAHB and all the airlines namely Malaysia Airlines, Airasia and Batik Air for their cooperation, assistance and caring spirit given to all the affected passengers. MAVCOM has also assured that all necessary efforts and assistance will be provided to the affected passengers.
Among the assistance given were:
(a) All affected passengers may change their flights to the other airlines that are offering discounted airfares; (b) MAHB has deployed its resources at relevant airports within its network to extend all possible assistance to the stranded passengers; (c) MAVCOM has set up the commission’s consumer hotline at 1800-18-6966 (within Malaysia) or by email at [email protected] or [email protected].
On the refund of airfares, all affected passengers are requested to contact MYAirline customer care service at [email protected] to initiate the refund process and at the same time, submit their enquiries or file their complaints to MAVCOM Consumer Hotline.
Aviation Safety Awareness Campaign
Tuan Speaker, the Ministry of Transport Sarawak in collaboration with the aviation stakeholders namely, Malaysia Airport Sdn Bhd, the Ministry of Transport Malaysia, MASwings and the Civil Aviation Authority Malaysia, have organised the “Aviation Safety Awareness Campaign” in Mulu Airport on 22nd and 23rd September 2023. The event was attended by an estimated 200 participants from the local community.
The objective of the awareness programme was to educate the local community on flight safety procedures. This is to ensure that the community members well-informed about the essential safety measures within and around the airport vicinity.
Additional Flights during Festive Seasons
Tuan Speaker, my Ministry is fully aware of the demand for air travel during festive seasons and school holidays. In this regard, my Ministry is working closely with the Ministry of Transport Malaysia, MAVCOM, MAHB and the airlines to ensure that flights and seats at reasonable prices are available to various destinations before, during and after the festive season.
While the airlines are offering extra flights and reasonable airfares, my Ministry would like to encourage travellers to plan their journeys ahead and book their flights early. This is to mitigate any potential shortcomings at an early stage and ensure that everyone has the opportunity to fly home and celebrate the joyous festival with their loved ones.
Airfare, Flight Rescheduling and Cancellation
Tuan Speaker, globally, airfares are determined by dynamic pricing mechanisms that are based on demand and market conditions. Thus, the increase in airfares are unavoidable. Meanwhile, flight rescheduling and cancellations are mostly due to unforeseen technical and operational issues, as well as bad weather conditions.
I would like to inform that most complaints on flight rescheduling and refunds are handled directly by the airlines with the assistance from MAVCOM under the Malaysian Aviation Consumer Protection Code (MCPC). If passengers remain dissatisfied with the airline's response, they have the option to escalate their complaints to MAVCOM through the MAVCOM website or www.flysmart.my.
Strengthening Sarawak’S Transport Sector
Sarawak Transport Conference, 6th September 2023
Tuan Speaker. in an effort to advance the transport sector in Sarawak, fostering knowledge and understanding is important. Recognising this, my Ministry organised the inaugural Sarawak Transport Conference 2023 with the theme “Transport Sector accelerating tourism, trade and investment in Brunei Darussalam – Indonesia – Malaysia – Philippines East ASEAN Growth Area (BIMP-EAGA) Region”. This event was attended by approximately 500 participants from government agencies and transport stakeholders in the BIMP-EAGA region.
This conference featured distinguished experts and speakers who presented 12 papers on sustainable transport and mobility, enhancing regional connectivity, trade and investment facilitation as well as tourism development and connectivity.
The platform provided valuable exposure and knowledge to the delegates. The discussion also highlighted the crucial role of the transport sector as an enabler for economic growth and social inclusivity whilst imparting insights on the significance of transport planning and development.
Regional Cooperation: 10th Brunei Darussalam–Indonesia–Malaysia–Philippines East ASEAN Growth Area (BIMP-EAGA) Transport Cluster Meeting, 7th - 8th September 2023
Tuan Speaker, the Sarawak Government represented by my Ministry had the honour to host the 10th BIMP-EAGA Transport Cluster meeting in Kuching from 7th to 8th September 2023. The meeting was attended by senior government officials, BIMP-EAGA Business Councils and the private sector from each country. My Ministry is also tasked as the Head of Delegation for the Malaysian Government. In the meeting, pertinent key regional transport issues were discussed under the three Working Groups namely, Land Transport Working Group, Sea Linkages Working Group and Air Linkages Working Group.
The notable recommendations made by the Working Groups and agreed by the Transport Cluster Meeting are as follows:
(a) The member countries of the Land Transport Working Group agreed that each member country will form a Task Force to review the MoUs, namely, the Cross-border Movement of Commercial Buses and Coaches, signed on 2nd November 2007; and Transit and Inter-state of Goods, signed on 25th June 2009. This is to ensure the MoUs are updated as per the ASEAN Framework and the current post COVID-19 rules and regulations enforced by the member countries.
(b) In addition, member countries of the Sea Linkages Working Group also agreed to review the policies, legislation and MoU on Establishing and Promoting Efficient and Integrated Sea Linkages, signed on 2nd November 2007. The Working Group also agreed with Malaysia that the operation of the Non-Convention Sized Ship (NCS) within the waters of BIMP-EAGA needs further discussion to harmonise the required specific technical standard that concerned the member countries. A task force will be formed for these purposes.
(c) Malaysia also highlighted in the Air Linkages Working Group that the BIMP-EAGA routes connecting Sarawak, Malaysia and Pontianak, West Kalimantan, Indonesia have been suspended since March 2022. In the meeting, Malaysia has proposed to the Indonesia Government to resume operation of the Supadio International Airport in Pontianak, West Kalimantan, Indonesia and expressed AirAsia Malaysia's readiness to resume Kuching-Pontianak operations. The representative of the Indonesian Government informed that the airport is scheduled to start operation for international flight in 2024.
(d) Additionally, Malaysia recommended exploring a collaborative effort between the Tourism Cluster and airlines to jointly promote and market intra-BIMP-EAGA tourist movements, aiming to boost tourism and the regional economy.
Malaysia through the Ministry of Economy as the BIMP-EAGA National Secretariat for Malaysia raised the same recommendation to the Ministerial Meeting‘s intervention which was held in Negara Brunei Darussalam on 26th October 2023.
Response To Specific Issues Raised By Honourable Members Of This August House
Tuan Speaker, the Honourable Member for Pending, Tuan Speaker, I would like to refer to the Honourable Member for Pending for her concern on the Autonomous Rapid Transit (ART).
Before I begin, I would like to inform this august House that I would give a detailed explanation of Autonomous Rapid Transit (ART), I hope the Honourable Member for Pending will cooperate and listen attentively to get the facts right.
For the information of this august House, the ART is a component of the Kuching Urban Transportation System (KUTS) project. KUTS Project is a transformative initiative aimed at enhancing public transport in the city and its surrounding areas.
In line with Sarawak’s commitment to environmental sustainability and the global target to adopt green technology, the hydrogen-powered Autonomous Rapid Transit (ART) was chosen to be the backbone of this game-changing project using state-of-the-art technology with competitive costs compared to the other urban rail transit projects.
Tuan Speaker, the KUTS project consists of multiple packaged tenders for its various components, such as studies, designs, engineering, construction, manufacturing, supply, delivery, assembly, testing and commissioning.
Phase 1 of the KUTS project involves ART's approximately 69.9 kilometres route that consists of three lines and 31 stations with one interchange station between the blue and red line. The Blue Line is about 27.6 kilometres in length with 14 stations from Rembus to the Hikmah Exchange area. The Red Line is about 12.3 kilometres in length with seven stations from Kuching Sentral to Pending and the Green Line is about 30 kilometres in length with five stations from Pending to Damai Central. The dedicated lanes for the ART will consist of approximately 80% at grade (road level) and 20% elevated, including bridges, ART Stations, utility relocations, road widening and land acquisition. The component of the project consists of:
(a) Infrastructure Works Covering two Depots; (Rembus – heavy maintenance depot and Sungai Batu – light maintenance depot). Facilities for the Depots consist of Administration and Operation Control Centre Building, Mechanical Workshop, Infrastructure Workshop, Stabling yard, Test yard, Wash-plant, Mechanical and Electrical Building and Hydrogen Refuelling station;
(b) System Works consists of 10 systems namely 38 units of Hydrogen Vehicles, Automated Platform Gates (APG), Signalling and Control System (S&CS) including Transit Signal Priority (TSP), Depot Equipment Maintenance Vehicle (DEMV), Supervisory Control and Data Acquisition (SCADA), Communication, Automatic Fare Collection (AFC), Information Technology System (ITS), Operation Control Centre (OCC) and Computerised Maintenance Management System (CMMS); and
(c) Feeder bus depot at Rembus consisting of Administration Building, Engineering Block, Stabling yard, Depot Equipment for bus maintenance, Hydrogen Refuelling Station, 55 Hydrogen Buses and Bus Information System (BIS).
For the information of this august House, the procurement of the ART hydrogen vehicles is a complex process, unlike typical purchases such as purchasing a car or buying groceries at the supermarket. The project implementation and management involve proper planning, design, procurement and scheduling of each technical aspect of the ART vehicle, to ensure that the various components’ contracts are properly integrated with the completion target date.
The advance procurement strategy of the ART hydrogen vehicle is based on international tender exercise. In 2021, an International Pre-Qualification was conducted by Sarawak Metro and the tender was advertised on Sarawak Metro’s website, local newspapers and international journals. This was carried out following the best practices to optimise costs and secure a stable supply of the ART hydrogen vehicles, which is specially designed for the KUTS project.
The manufacturing of these ART vehicles will be carried out progressively and delivered in stages, according to the project timeline, with the first batch expected in the 3rd quarter of 2024. The expected scheduled delivery of ART vehicles will be about two units between one to two months per shipment subject to shipment schedule, local final assembly, testing and commissioning. Therefore, not all 38 units will be shipped at one time. It is imperative to award the ART hydrogen vehicles now to established design integration with other ART systems and civil infrastructure related to the hydrogen vehicle. All this goes to show that the Honourable Member for Pending is ignorant when she questions the award of the procurement of the rolling stock before completing the infrastructure.
Furthermore, I would like to highlight that the procurement and overall tender and evaluation processes involve multiple stages. The processes adhere strictly to transparent and integrity driven governance. Therefore, tenderers are required to meet strict technical and financial pre-requisites to progress to the subsequent commercial evaluation phase. Only those meeting these criteria will undergo an assessment of their commercial proposals, with the final selection based on commercial pricing.
KUTS Phase 1 Project
Tuan Speaker, the KUTS Phase 1 project’s approximate cost per kilometre is RM80 million, covering a total length of 69.9 kilometres, which includes land acquisition costs, ART hydrogen vehicles, feeder buses, infrastructures and depot, etc. Comparatively, the latest LRT project, LRT3 in Kuala Lumpur, has significantly higher cost per kilometers. The LRT3 project with a length of 37.6 kilometres in Kuala Lumpur costs RM20 billion, which is approximately RM540 million per kilometre. Therefore, in comparison, this would mean that the ART’s per kilometer cost is approximately one-sixth of the price of the LRT3 project in Kuala Lumpur that commenced in 2017.
The ART vehicle, procured in the System Package 1 contract was awarded to EPR Mobilus GR Joint Venture Sdn. Bhd. RM1.425 billion which involves the design, engineering, procurement, manufacture, assembly, supply, delivery, installation, testing and commissioning and handover of hydrogen vehicles, depot and equipment and maintenance vehicle, automatic platform gates and signalling and control system. Therefore, it is clear that the tender is a package, not a single item. The tenderer meets all the technical and financial criteria, and it is the lowest tender.
Tuan Speaker, I would like to give assurance that stringent monitoring procedures have been implemented to ensure that the project stays within the approved budget. As of today, the current awarded packages are within the estimated project budget. My Ministry is overseeing this project to ensure that all procurement activities align with Sarawak Government’s Project Procurement Policy (PPP). Additionally, my Ministry also prioritises overall cost-saving measures through sound project management.
I would also like to inform that it is not relevant to compare the pricing of ART hydrogen vehicles and ART electric vehicles as they use different technologies and energy sources with its own unique characteristics.
ART Electric Vehicle
Tuan Speaker, I would like to enlighten this august House on the difference between ART electric vehicle and ART hydrogen vehicle. For the comparison of distance, electric vehicle’s total distance coverage is 70 kilometres at full charge, whereas the full tank hydrogen fuel cell vehicle can travel up to 240 kilometres.
The ART electric vehicle is powered by lithium batteries. Rechargeable lithium batteries have a limited lifespan and will gradually lose their capacity to hold a charge. This loss of capacity or aging is irreversible. As the battery loses capacity, the length of time it takes to power the product run time decreases. Furthermore, the improper disposal of lithium batteries can have severe implications to the natural environment.
It can be noted that the recycling of the EV batteries is a less cost-effective and not environmentally sustainable option compared to hydrogen fuel cells. The limitation of battery technology in electric vehicles also affects the electric vehicle’s capability of travelling long distances. On the other hand, hydrogen as a fuel source offers higher energy density, providing longer range and quicker refuelling times.
Adoption of Hydrogen Energy
Tuan Speaker, the worldwide interest in green hydrogen is expanding rapidly. There is a global shift towards hydrogen adoption, driven by a commitment to combat environmental issues and the increasing emphasis on sustainable solutions. In land transport, for example, China is actively promoting hydrogen-powered vehicles, signalling a move away from subsidies for electric vehicles.
In the aviation sector, hydrogen is gaining recognition as a promising zero-emission technology for future aircrafts. Industry leaders such as Boeing and Airbus are investing in hydrogen propulsion technology, with Airbus planning to launch its first commercial hydrogen-powered aircraft by 2035.
In the marine industry; the shipping sector, which is known for significant emissions, is actively exploring hydrogen-powered vessels. Companies globally, including Compagnie Maritime Belge in Belgium, Ulstein in Norway and Compagnie Fluviale de Transport (CFT) in France, are developing hydrogen-powered ferries, tugboats and cargo vessels.
The KUTS project, featuring hydrogen-powered Autonomous Rapid Transit (ART) vehicles, is seamlessly aligned with Sarawak's hydrogen agenda. This showcases Sarawak's commitment with global endeavours for sustainable and environmentally friendly transport solutions. Furthermore, based on the working paper by World Energy Council, the cost of production in 2030 is expected to go down and to reach USD2 to USD6 per kilogram and USD1 per kilogram or lower by the year 2050 due to reducing renewable electricity costs and hydrogen technologies following technology improvements and economies of scale.
In the case of Sarawak, we are fortunate to have access to renewable energy resources, especially hydropower, which will be harnessed to power the hydrogen electrolysis plant. Furthermore, our electricity cost is also the cheapest in the region. Sarawak is at the forefront of the green hydrogen agenda, which is expanding in collaboration with investors from South Korea and Japan to develop two major green hydrogen production plants in Bintulu.
Tuan Speaker, one of the most significant returns on the investment in this project is the reduction in the environmental impact of public transportation through the usage of green hydrogen energy which subscribes with the United Nations sustainable development goal of reducing carbon emissions. It is also to improve the quality of life of the people living in Greater Kuching by improving and enhancing mobility through an environmentally sustainable system of public transportation.
Once fully completed, the KUTS project will create numerous intangible benefits and socio-economic spillover effects including greater job opportunities, more efficient mobility and urban rejuvenation which are among some of the key returns of the Sarawak Government investment in transforming the public transport system in Greater Kuching.
Tuan Speaker, having given all the facts on the processes and implementation of ART project, I hope the Honourable Member for Pending will have a good understanding of the subject matter and do not make assumptions and jump to serve conclusion which can mislead the public.
Tuan Speaker, for the information of the Honourable Member for Bukit Assek, my Ministry has commissioned the Sarawak Integrated Transport Master Plan study which is expected to be completed in 2024. One of the focuses of this study includes the analysis on traffic management related issues such as traffic congestion. The study will also carry out demand forecasting and the analysis of trip generation, vehicle ownership, trip distribution and the overall traffic flow of Sibu.
Tuan Speaker, the Honourable Member for Katibas. For the information of the Honourable Member for Katibas, on the issue of bus terminal and longboat terminal in Katibas, my Ministry is planning to do a preliminary survey on the needs to construct an integrated bus and longboat terminal. My Ministry will bid for funds for this project in the 13th Malaysia Plan.
Strengthening Of Ministry Of Transport, Sarawak (Mots)
Tuan Speaker, my Ministry is committed to ensure the transport sector development, particularly public transport, is in tandem with Sarawak’s aspiration to achieve a developed status by 2030, where the people enjoy economic prosperity, social inclusivity and sustainable environment.
Laying the Foundation
Tuan Speaker, being one of the enablers of the six economic sectors anchoring the PCDS 2030, my Ministry is progressing considerably well in laying all the necessary foundations for economic growth and development such as governance and planning processes, exploring potential public private partnership opportunities as well as identifying supportive regulatory framework for the development of the transport sector in Sarawak.
Review of Policy and Procedures
Tuan Speaker, in view of this, my Ministry needs to strengthen its mandate and authority as a transport planning authority in Sarawak with the international, Federal and local institutions. Hence, my Ministry will continue to work closely with the Sarawak Attorney General's Office to review existing rules and regulations pertaining to transport matters in Sarawak. This strategic engagement is aimed to identify issues, solutions as well as to reduce legal gaps between Ministry of Transport, Sarawak (MOTS) and the Ministry of Transport, Malaysia (MOT), including other Federal Government departments and agencies.
Digital Exhibition in conjunction with the 60 Years Sarawak Merdeka Anniversary Celebration
Tuan Speaker, the Digital Exhibition held in 12 locations throughout Sarawak in conjunction with the 60th year Sarawak Merdeka Anniversary Celebration from 26th May 2023 until 22nd July 2023 had provided an opportunity for my Ministry to promote and showcase its roles and functions to the rakyat and industry players. The event is also used to gauge the rakyat's perception and expectation on the Sarawak public transport services as well as their awareness and knowledge of road and river safety. Their feedback is valuable as it enables my Ministry to make informed decisions and necessary adjustments toward our plan and strategies to meet our rakyat's needs and expectations.
Ministry of Transport, Sarawak (MOTS) Strategic Planning and Action Plan 2030
Tuan Speaker, my ministry has reviewed its Strategic Planning and Action Plan 2030 in March and September this year. This is to ensure that the Strategic Planning and Action Plan 2030 provide a clear direction for the success and sustainability of Ministry of Transport, Sarawak as well as achieving PCDS 2030 goals by optimising resources and adapting to change. This is to enhance decision making, teamwork and collaboration, reducing silos and promoting a unified organisational culture. The review also took into account feedback received from the rakyat through surveys conducted during the Digital Exhibition and Talikhidmat. The Action Plan will be measured by the implementation of the Ministry's Balanced Scorecard with effect from January 2024. The implementation of this strategic planning will further enhance our performance and service delivery to the rakyat and overall contribute actively to the realisation of PCDS 2030.
Talent Development Through Strategic Partnership
Tuan Speaker, the existence of the Ministry of Transport, Sarawak is now recognised internationally. Since January 2023, Ministry of Transport, Sarawak has been invited to participate in various transport and mobility seminars, conferences as well as training overseas.
The most notable conference attended by MOTS was the Public Transport Summit in Barcelona, Spain organised by the International Association of Public Transport (UITP) from 3rd until 9th June 2023. In the foregoing, the Permanent Secretary of MOTS was invited to attend the 22nd UITP Asia-Pacific Annual Meeting on 1st until 3rd November 2023 at Hong Kong and at the same time, presented a paper on Transport in Sarawak.
I am pleased to announce that Minister of Transport Sarawak is now a member of the International Association of Public Transport (UITP), a non-profit member-led organisation for public transport authorities, networks and operators, and policy decision-makers. It also includes scientific institutes and the public transport supply and service industry that work to advance sustainable urban mobility. The UITP Headquarters is in Brussels, Belgium. To-date, MOTS has presented six papers on Transport and Mobility in Sarawak, regionally and internationally.
Tuan Speaker, my Ministry is continuously searching for talent who can be trained on the subject of transport and mobility in compliance with sustainable development goals. Thus, MOTS has established its Human Resource Capacity Building Plan to ensure Ministry of Transport Sarawak human resource management and development plans meet its strategic goals and operational plans. Since January 2023, a number of officers in my Ministry have had the opportunity to attend various conferences, training and study trips internationally and locally.
My Ministry had the opportunity to dispatch three officers to undergo training programmes on Urban Planning and Public Transportation, and Railway Planning and Construction for South and Southeast Asian Countries in China fully sponsored by the Ministry of Commerce (MOFCOM), People's Republic of China. Another two officers attended the Urban Mobility Program for Foreign Public Officials and the Human Resource Development Program on Railway Policy and Safety Course, which were also fully sponsored by the Seoul Metropolitan Government and the Ministry of Land, Infrastructure and Transport, South Korea, respectively.
In addition, Ministry of Transport Sarawak had also sent officers to attend the 15th International Conference of the Eastern Asia Society for Transportation Studies, Women in Rail Malaysia Conference 2023, Kolokium Penguatkuasaan Keselamatan Jalan Raya Tahun 2023 and many other transport related conferences in Kuala Lumpur and Putrajaya. These training and development programmes will not only enhance their knowledge and skills on transport and mobility but will also contribute to the overall strength, effectiveness, and efficiency of the Ministry. This will further strengthen Ministry of Transport Sarawak workforce competencies in dealing with the complex aspects of transportation issues in Sarawak while providing services to the rakyat.
CONCLUSION
Tuan Speaker, before I end my winding-up speech, I am pleased to reflect on my Ministry's transformative journey and express our vision for the state’s transportation future. As we navigate the post COVID-19 challenges, strategic adaptation is crucial for progress. My Ministry at the forefront of efforts, has championed regional connectivity and sustainable development through initiatives like the Sarawak Integrated Transport Master Plan.
My Ministry is working to make travel better for everyone, whether by land, air, rivers, or seas. Rebuilding our economy and society after COVID-19 is not an easy task, but we are committed to it. Our plan, called the Sarawak Integrated Transport Master Plan, shows how we are working on making travel easier in Sarawak. The Post COVID-19 Development Strategy 2030 is our guide to making things better overall.
To conclude, I want to express my profound gratitude to my Deputies, Permanent Secretary and staff who have been my pillars of support for their commitment, dedication, and relentless pursuit to overcome challenges and transform the transport sector in Sarawak.
A special acknowledgement goes to all the agencies and stakeholders that have collaborated with my Ministry, especially MOT Malaysia and agencies under their purview including the Malaysian Aviation Commission (MAVCOM), Civil Aviation Authority of Malaysia (CAAM), Road Transport Department (JPJ) Sarawak, Sarawak Commercial Vehicle Licensing Board (CVLB), Royal Malaysia Police (PDRM) and Marine Department Sarawak. Additionally, our appreciation extends to Sarawak Rivers Board, Sarawak Buoys and Lights Board, Public Works Department Sarawak, Sarawak Road Safety Council, Sarawak Economic Development Corporation, Sarawak Metro, members of SPTC and SuTMAC including those at the Divisional level. I extend my heartfelt appreciation to Yang Berhormat Datuk Amar State Secretary, Yang Arif Datu State Attorney-General, and Yang Berbahagia Dato Sri State Financial Secretary for their continuous support.
Last but not least, I would also like to express my sincere appreciation to Tuan Speaker and the team for their dedication and efficiency in handling the proceedings of this august House and before I conclude, saya ingin menurunkan 4 rangkap pantun.
Enam Dekad Bukannya Mudah, Sarawak Kian Berubah Wajah, ART Hampir Terlaksana Sudah, Kini Airlines Membuka Langkah.
Membeli Durian Di Kota Padawan, Untuk Dibawa Ke Pekan Siniawan, Kementerian Pengangkutan Kini Tumpuan, Sebagai Tonggak Meneraju Kemajuan.
Gua Niah Tiada Tandingan, Tumpuan Pelancong Pelbagai Umur, Kerajaan GPS Tiada Bandingan, Melahirkan Sarawak yang Maju dan Makmur.
Buah Dabai Lemak Berisi, Sekali Makan Pasti Nak Lagi, Hujah Pembangkang Tiada Berisi, Silalah Balik Belajar Lagi.
Well Wishes – Merry Christmas & New Year & Chinese New Year
Tuan Speaker, akhir sekali, saya ingin mengambil kesempatan ini untuk mengucapkan Selamat Hari Krismas, Selamat Tahun Baharu 2024 dan Selamat Tahun Baharu Cina kepada semua Rakyat Sarawak yang akan menyambutnya. Semoga Sarawak terus maju makmur, kekal harmoni serta diberkati.
Tuan Speaker, I wish to express my full support for the Supply Bill, 2024. Thank you.
Thank you, the Honourable Minister of Transport, Dato Sri Lee Kim Shin, for a very lengthy, profound, and comprehensive winding up. I also have one pantun. Eh, two. Four pantun.
From Saratok going to Sibu, Stopping at Meradong to buy yeast, Tomorrow morning we shall meet, So that the sitting may continue again.
Honourable Members all, the Sitting is now adjourned and the House shall resume its Sitting at 9.00 a.m. tomorrow. Insya-ALLAH.
(The Sitting was adjourned at 5.08 p.m.)