Sarawak · 18 November 2024
19th Assembly, 3rd session, 2nd meeting (unedited) · not final · 154 turns · 35,739 words · official PDF ↗
ExperimentalSarawak publishes only unedited transcripts (Belum Disunting). The 19th Assembly was dissolved on 26 Oct 2026. Speakers are matched by our parser and will have some errors.
(Opening)
Peace be upon you, and the mercy and blessings of Allah. Good morning and greetings of peace. Honourable Members, I have granted leave of absence under Standing Order 81 to YB Dato Sri Tiong King Sing, Honourable Member for N.52 Dudong, and YB Encik Azizul Annuar bin Pehin Sri Haji Adenan, Honourable Member for N.3 Tanjong Datu, for today's sitting.
CONTINUATION OF DEBATE ON THE SECOND READING OF THE SUPPLY (2025) BILL, 2024 AND THE MOTION TO REFER THE DEVELOPMENT EXPENDITURE ESTIMATES RESOLUTION FOR THE YEAR 2025
With respect, I invite YB Dato Sri Roland Sagah Wee Inn, Minister of Education, Innovation and Talent Development, to deliver the winding-up speech.
Terima kasih, Tuan Speaker. A very good morning to everyone. Tuan Speaker, first and foremost, I would like to congratulate our Tuan Yang Terutama Yang di-Pertua Negeri, Tun Pehin Sri Dr. Wan Junaidi bin Tuanku Jaafar, on his appointment as the Fourth Chancellor of Universiti Malaysia Sarawak (UNIMAS).
I would also like to congratulate the Right Honourable Datuk Patinggi Tan Sri (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Premier of Sarawak for being conferred the Darjah Setia Negara Brunei Yang Amat Bahagia Darjah Pertama (P.S.N.B.) that carries the title of “Dato Seri Setia”, that was in conjunction with the 78th birthday of His Majesty, the Sultan of Brunei Darussalam on 15th July 2024, as well as, Darjah Tertinggi Negeri Sabah, Datuk Seri Panglima Darjah Kinabalu (S.P.D.K.) that carries the title of “Datuk Seri Panglima” in conjunction with the 71st official birthday celebration of His Excellency, the Governor of Sabah on 5th November 2024.
I would like to take this opportunity to congratulate the Honourable Members of this august House who were conferred the state’s honours, titles, and awards in conjunction with the 78th birthday celebration of His Excellency, the Governor of Sarawak on 12th October 2024.
Firstly, the Honourable Member for N.45 Repok, Dato’ Sri Huang Tiong Sii, who was conferred Panglima Gemilang Bintang Kenyalang (P.G.B.K.) that carries the title of “Datuk”. And, YB Dato Fazzrudin bin Haji Abdul Rahman of N.6, Honourable Member for N.6 Tupong; and also the YB Dato Mohd Chee bin Kadir, Honourable Member for N.40 Kabong. Both were conferred the Panglima Setia Bintang Sarawak (P.S.B.S.) that carries the title of “Dato”.
Tuan Speaker, I am grateful to the Right Honourable Premier of Sarawak for the RM15.8 billion, State Budget for 2025 that was tabled, the largest in Sarawak’s history. Not only is this a surplus and the development-focused budget, it is also inclusive and people-centric. Of this, RM744.7 million is dedicated towards education, human capital development and innovation.
EDUCATION
Implementation of Dual Language Programme Sarawak (DLP Sarawak)
Tuan Speaker, allow me now to delve into education matters, the implementation of Dual Language Programme Sarawak (DLP Sarawak). DLP Sarawak was first implemented in 2020, starting with Primary One students. Currently, it is already in its fifth year of implementation, with the first cohort of students in Primary Five.
Unlike the National Dual Language Programme, DLP Sarawak adopts a 100% English-medium approach for teaching and learning of Science and Mathematics subjects across all government primary schools in Sarawak. One very important factor to the successful implementation of DLP Sarawak, is the quality of our teachers. Recognising this factor, my ministry has committed substantial resources on the Continuous Professional Development (CPD) for DLP Sarawak teachers. To date, we have trained 6,545 DLP teachers from Primary One up to Primary Five. By next year, we will move on to train our Primary Six and Form One DLP teachers.
Additionally, my ministry is consistently working with Sarawak State Education Department (JPNS) to design targeted and customised DLP intervention programmes and provide supplementary teaching and learning resources to further enhance the effectiveness of DLP Sarawak.
Standardised Assessment for Dual Language Programme (DLP) Sarawak for Year Six and Form Three
Tuan Speaker, after considering the many requests from various parties concerning the need to have a standardised assessment, I am glad to announce that Sarawak is implementing a Standardised Assessment for DLP Sarawak students, in Year Six, starting 2025 and Form Three, starting 2028.
The main objective of this assessment is to evaluate the progress of teaching Science and Mathematics in English under the DLP Sarawak program. The first DLP Sarawak cohort will reach Primary Six in 2025, providing an ideal time to assess the program’s impact and make improvements where necessary.
We are very thankful that the Ministry of Education Malaysia (MOE) has given us the approval to implement this assessment. This standardised assessment also serves as an early preparation, to help students build the skills and confidence they need to sit for public examination, especially, Sijil Pelajaran Malaysia (SPM).
For Primary 6, I am pleased to announce that my ministry, in collaboration with Cambridge University Press and Assessment, Sarawak-owned institutions of higher learning, JPNS and private schools in Sarawak, is currently developing the instrument of assessment. Additionally, Cambridge University Press and Assessment is providing expertise to ensure our standards are on par with international benchmarks. This collaborative effort will allow the first Standardised Assessment for DLP Sarawak at Primary 6 to be carried out in 2025, covering Science, Mathematics, and English subjects.
I call upon all stakeholders including teachers, parents, and the community at large, to support this initiative, in order to ensure its success and elevate the quality of education in Sarawak. I would like to reassure this august House, that Sarawak is committed to the continuity of DLP Sarawak, for as long as it is needed and is relevant.
Upskilling of Non-Option Science, Mathematics, and English Teachers
Tuan Speaker, another area of focus of my ministry is on the upskilling of non-option teachers, especially for critical subjects such as Science, Mathematics, and English. I am pleased to report that my ministry, in collaboration with Institut Pendidikan Guru Kampus Tun Abdul Razak (IPGKTAR), has completed the upskilling for all 3,600 non-option Science, Mathematics, and English subject teachers in Sarawak since 2020.
These trainings aim to strengthen not only pedagogical techniques, but also improve content knowledge, enabling teachers to deliver a higher standard of education in subjects outside their original area of specialisation.
Sarawak’s Raspberry Pi Initiative
Tuan Speaker, since 2020, the Sarawak Government has introduced an initiative to enhance students’ digital competency by providing Raspberry Pi computers to all 1,265 primary schools, as well as training for ICT teachers. We are now nearing the completion of the Raspberry Pi Training Programme.
We are excited to see more students leveraging Raspberry Pi for STEM and Innovation competitions such as STEM Trailblazers. We hope our teachers will make full use of this tool and continue to mentor and guide our students' learning and innovation. Our heartfelt appreciation goes to the dedicated teachers and to Swinburne Innovation, for their collaboration and steadfast support.
Learning Recovery
Tuan Speaker, now, I would like to inform this august House on my ministry’s collaboration with Yayasan Hasanah and Chumbaka on Program Anak Kita. This programme focuses on learning recovery to strengthen students’ foundational skills – that is reading, writing, arithmetic, benefiting 204 schools and 8,000 Primary 2 to Primary 6 students. We extend our gratitude to Yayasan Hasanah for their sponsorship and commitment to this vital cause.
Sarawak’s Education Enhancement Programme (SEEP)
Tuan Speaker, now, allow me to share a new initiative under my ministry – the Sarawak Education Enhancement Programme (SEEP). It was introduced to improve Sarawak’s overall SPM performance over the next three to five years. This programme represents a considerable investment of RM15 million, targeting low performing students in Form 3, Form 4, and Form 5.
In terms of outcome, we expect to see a notable improvement in students’ SPM academic performance. The target is to bring Sarawak’s Gred Purata Negeri (GPN) to be on par with the national average. Additionally, we are aiming for an increase in the number of students eligible for STEM enrolment at 60% by the year 2030. SEEP is more than just an academic programme; it is an investment for the future of Sarawak. We thank the Right Honourable Premier for the significant allocation for this programme. Thank you, Sir.
Continuous Improvement of Dilapidated Schools
Tuan Speaker, my ministry has always placed the highest priority on ensuring a safe and conducive learning environment for our children. Although education is a federal matter, as a responsible government, Sarawak has always been taking proactive measures, investing significant resources to address gaps and provide the support necessary to uplift our schools.
One of the most significant initiatives of Sarawak or the Sarawak Government is the comprehensive redevelopment of dilapidated schools through the RM1 billion advanced payment programme. To date, we have successfully completed 58 projects, ensuring that approximately 10,000 students have access to quality learning facilities.
In addition, Sarawak has redeveloped three schools through our own Projek Rakyat initiative, and another 28 schools under the Northern Region Development Agency (NRDA) project. Collectively, these efforts have directly benefited almost 9,000 students.
Building on our commitment to enhance the quality of education infrastructure in Sarawak, I am pleased to share that on the 22nd of June 2024, the Right Honourable Premier of Sarawak announced the RM100 million Advance Payment Project to address dilapidated schools and this was with approval from the Right Honourable Prime Minister of Malaysia.
The project targets 16 schools, jointly identified by my ministry, Jabatan Kerja Raya (JKR) Sarawak, and JPNS. The list of projects is prioritised based on school categorised as unsafe that is under Scale 6 and Scale 7, and implementable within 18 months. In addition, Sarawak received RM50 million in July of 2024, channelled directly from the Federal Ministry of Education (MOE) to JKR Sarawak for operational, maintenance, and upgrading works across 217 schools, with completion expected within this calendar year. I would like to thank the Ministry of Finance (MOF) and MOE for this special budget arrangement for Sarawak.
However, there is a need for MOF to clarify that the RM50 million channelled through MOE to JKR Sarawak is not part of the RM100 million allocation. The scope of work given for the RM50 million is merely for maintenance and minor upgrading works instead of redevelopment to address the dilapidated schools. My ministry remains fully committed to improving school infrastructure for the safety and well-being of students and staff. We will not cease our efforts until all issues related to dilapidated schools are effectively addressed, ensuring that our schools provide a conducive environment for learning.
Special Teacher Recruitment for Sarawak
This is a very popular subject. Tuan Speaker, since 2017, Sarawak has been facing a shortage of 2,000 to 3,000 teachers annually. My ministry has pushed for a special recruitment drive through persistent negotiations with Suruhanjaya Perkhidmatan Pendidikan (SPP), MOE and JPNS. The dedicated recruitment drive to fill 1,733 teachers post across Sarawak is the result of our collaboration. I am referring to the one that was done recently.
The recruitment exercise throughout the state, attracted strong interest, with over 15,000 applicants. A total of 2,010 potential candidates were shortlisted for final interviews, which were held in Kuching, Sibu, and Miri. I have conveyed to SPP our commitment to prioritise Sarawakian candidates, to ensure continuity and sustainability.
We hope that the deployment of teachers under this Special Teacher Recruitment Sarawak, will be finalised before the end of 2024. Through this initiative, we aim to end teacher shortages in Sarawak, ensuring that every child, particularly in rural areas, has consistent access to quality education.
Higher Education
Tuan Speaker, my ministry and I fully support the vision of the Right Honourable Premier to make tertiary education more accessible to students from all backgrounds, particularly those in the rural areas. In line with the YAB Premier's announcement on free tertiary education at state-owned institutions of higher learning, my ministry is currently finalising the details, including the range of courses covered and other key aspects of the initiative.
Access to tertiary education is crucial for Sarawak’s development, as it will help build the human capital needed to drive Sarawak towards becoming a high-income state. In an effort to bridge the digital divide, enhance access to essential learning tools, and reduce the financial burden on students, the Sarawak Government is providing free laptops to all first-year university students with household income per-capita of RM1,500 and less per month.
For this purpose, per-capita income means a measure of the total monthly household income, divided by number of dependents. For example, in one family, both parents and one child are working, with a total monthly household income of RM12,600, and the family has seven children. The per-capita income of this family is RM12,600 divided by nine persons, which means it is RM1,400. Thus, any of these children who enter first year of university is eligible. Additionally, free book vouchers are being offered to all Sarawakians studying at both the private and public universities across Malaysia. These initiatives are benefiting thousands of Sarawakian students, empowering them to excel in their studies. My ministry, Swinburne University of Technology Sarawak and University of Malaya (UM) have signed a Memorandum of Understanding (MoU) to introduce UM’s Bachelor of Law (Honours) programme in the state. This collaboration aims to equip students with knowledge of the laws in Malaysia and Sarawak laws, matters relating to the Malaysia Agreement 1963 (MA63), Inter-Governmental Committee Report 1962 and customary laws. All the achievements that I have mentioned show my ministry’s commitment to improving the quality and resilience of education in Sarawak.
Issues Related to Education
Tuan Speaker, allow me to spend some time to respond to matters raised by the Honourable Members of this august House pertaining to education. Firstly, on the issue highlighted by the Honourable Member for Daro regarding the construction of SK Batang Lassa, for your information, it has been approved under the 12th Malaysia Plan, Rolling Plan 5 and the construction is expected to commence in 2026.
For the information of the Honourable Member for Engkilili, SK Issu Bangat has been approved for upgrading under the 12th Malaysia Plan, Rolling Plan 2. As for SK Nanga Lidong, SK Nanga Menjuau, betul kah? betul ya nemu gak jako Iban. SK Entalau Ulu Skrang, SK Nanga Tebat and SK Kem Skrang, JPNS will bid for the upgrading of these schools under the 13th Malaysia Plan. As for the issue on electricity supply for SK Nanga Menjuau, it has been resolved. Udah bisi api jangka ku. Nadai? Anang dek.
To the Honourable Member for Krian, dini Krian tadi? Even though there is no school in your constituency that is covered by the RM100 million project, two schools namely, SMK Agama Saratok and SK Sungai Entebu have been approved for upgrading under the 12th Malaysia Plan, Rolling Plans 4 and 5, respectively.
On the query raised by the Honourable Member for Kalaka, the proposed Vocational College project is still in a planning stage. The visit to Kampung Kaba was to identify a potential site. But, to date, the site has not been confirmed. In response to the Honourable Member for Serembu, I fully understand your concerns about overcrowded schools in the Bau District. For your information, the construction of a new secondary school, SMK Batu Kitang, Batu Kitang? YB Dato Lo is happy, which is only 15 minutes’ drive from SMK Paku, has been proposed and will be submitted under the 13th Malaysia Plan, Rolling Plan 1. The proposed new school will ease the congestion at SMK Paku.
To the Honourable Member for Bukit Semuja, I share your frustration over the prolonged delay in the planning process for SMK Serian 2 and SK Sri Sadong. For your information, due to unforeseen technical issues on site identification and the tender prices exceeding the project ceiling, MOE will be rebidding both projects under the 13th Malaysia Plan, Rolling Plan 2. For the overcrowding at SK St Patrick Tangga and SK Serian, my ministry will definitely put up to MOE for immediate action.
For the information of the Honourable Member for Bukit Semuja, concerning the reintroduction of Bible Study in our primary schools, I understand your concerns and my ministry will raise this matter to MOE for further discussions. On the request by the Honourable Member for Batu Danau, regarding the introduction of pure science subjects in Form 4 and Form 5, at SMK Mendamit, my ministry has addressed the matter with JPNS. The school is encouraged to submit its application to JPNS for their action.
Concerning the issue raised by the Honourable Member for Katibas and Telang Usan on the opportunity to enrol into Yayasan Sarawak International Secondary Schools, it is the policy of the state to ensure that at least 50% of the students are from the under-privileged group, especially those from the rural areas. Therefore, the issue of competing with their city counterparts does not arise. With regards to the absence of science rooms in our primary schools, as a matter of fact, my ministry has put up our recommendations to MOE to address this issue. At the same time, the Sarawak Government is in the process of building centralised labs in the state.
Now, to address the issue on screening of special needs students mentioned by the Honourable Member for Meradong, this one actually has been answered during the Q&A session by my Deputy. But anyway, 21 students in Meradong are waiting for further assessment by specialists from the Sarikei Hospital. Follow-up appointments for these students have been scheduled for the 10th of January 2025. Regarding the issue of teacher shortages and the special teacher recruitment exercise in Sarawak raised by the Honourable Member for Batu Danau, as I have mentioned earlier, I have expressed the same concerns to SPP, and they have assured us that priorities will be given to Sarawakian candidates to fill the vacant posts.
I want to put on record in this august House, my sincere thanks to all the Honourable Members, especially Batu Kitang, Pelagus, Serembu, Meradong, Meluan, Pujut, and Telang Usan, for your support towards my ministry’s initiatives, namely DLP Sarawak, Standardised Assessment, Sarawak Education Enhancement Programme (SEEP) and the Special Teacher Recruitment programme.
INNOVATION
Tuan Speaker, now, I would like to share with this august House on the latest development of innovation.
Sarawak Innovation Index (SARii)
Sarawak Innovation Index (SARii) but this is not the Indian saree. I would like to inform that, to elevate Sarawak on the global innovation landscape, it is essential for our achievements to be recognised by leading international bodies such as the World Intellectual Property Organization (WIPO) and the Organisation for Economic Co-operation and Development (OECD), through established frameworks like the Global Innovation Index (GII). While Malaysia currently ranks 33rd in global innovation, there is a need to develop a distinct analysis of Sarawak’s specific innovation ecosystem. In response, we are proposing the establishment of the Sarawak Innovation Index (SARii), modelled on the GII, with similar pillars and indicators. Our SARii data will be evidence-based and, importantly, audited by international entities like the World Bank and the United Nations to ensure global recognition and credibility. I’ll have instructed my ministry to further explore on developing the Sarawak Innovation Index, with the aim to launch it next year.
STEM and Innovation
Tuan Speaker, as part of our efforts to achieve 60% enrolment in STEM, my ministry has been actively promoting STEM and Innovation through statewide programmes and activities this year, such as:
(a) STEM Trailblazers; (b) NASA Space Apps Sarawak; (c) Smart Innovation Competition; (d) Techlympics; (e) Junior Innovate and Young Innovators Challenge; (f) SMD Semiconductor Sarawak IC Design Make-a-thon; and (g) More than 60 STEM programmes in schools and universities.
Sarawak achieved outstanding success in many Robotic competitions, at both national and international levels. At the national level competition, which was held at the Multimedia University in Cyberjaya, teams from SMK Chung Hua Miri and IPG Kampus Sarawak won gold, silver and bronze in various categories. Building on their national successes, our teams continue to excel at the international competitions. The achievements are as follows: (a) 2024 World Robotic Olympiad, Italy – SMK Chung Hua Miri and IPG Kampus Sarawak emerged as World Champion and 1st Runner-Up in their respective categories. These teams are representing Malaysia at the World Robot Olympiad (WRO) International Final in Türkiye end of this month; kuat sikit lah! Tuan Speaker, saya punya rakan-rakan sini not happy with me anymore (Laughter).
(b) Technovation Girls World Summit 2024, US – Agape team – consisting of students from Sarikei won the Technology Award; this is international level, you know.
(c) Air Land Conquest 2024 Robomaster Challenge, Singapore – Woodlands International School won third place in the Open Category; and
(d) International Tech Summit, Beijing, China – SJK Chung Hua No. 6 won two gold medals, one silver, two outstanding awards, and the best business plan award.
Our dedication to develop quality STEM education has been recognised with prestigious awards. In September 2024, my ministry was honoured to receive the JCI Malaysia Sustainable Development Award 2024 for Sustainable Development Goal no.4 that is Quality Education. Tepuk lah sikit. Tuan Speaker, tak ada semangat ini.
Talent Development
Tuan Speaker, allow me to provide updates on talent development. Sarawak's economy is diversifying into sectors like aerospace, green technology, and renewable energy. These sectors promise high-value jobs and sustainable growth. However, a crucial question arises; are local talents prepared to meet the demands of these emerging industries?
To face this challenge, my ministry has taken initiatives including the promotion of Technical Vocational Education and Training or (TVET) and Industry Continuous Professional Development (iCPD), a workforce upskilling and reskilling programme through synergistic partnership with state and federal Ministries, agencies, state-owned training and educational institutions, academia and industries including PETRONAS and Pertama Ferroalloys Sdn Bhd. Sarawak is committed to developing a highly skilled workforce, targeting 30% by 2030. At the recent MBOT ENTICE 2024 event, the YAB Premier set a goal of 10,000 technologists or technicians’ registration by 2025. We have made considerable progress towards this goal, with 7,039 professionals registered as at September of this year.
To further enhance workforce capabilities, Sarawak has recently partnered with the Malaysia Productivity Corporation (MPC), to upskill and reskill our workforce through initiative, such as the iCPD programme which has covered 584 participants throughout Sarawak, and the Recognition of Prior Experiential Learning (RPEL) programme which has enrolled 178 individuals. The Sarawak Workforce Information System (SWIS) has registered 1,025 companies and 96 institutions so far. I wish to record my appreciation to industries and institutions for supporting SWIS. My ministry seeks the support from both industries and institutions to actively update your data in the system. I also call upon other industries and institutions to come forward and register with the system.
To complement SWIS, in October this year, my ministry had launched the Sistem Pesanan Kerjaya (SPEAK), they call it as SPEAK. SPEAK is a platform to provide up-to-date information on opportunities for further study and training to upper secondary school students. This week, my ministry in collaboration with the Centre for Instructor and Advanced Skills Training (CIAST), JPK Wilayah Sarawak and Centre for Technology Excellence Sarawak (CENTEXS), will be hosting the seminar on TVET: Bridging the Gap Between Education and Employability here in Kuching. In December, my ministry in collaboration with Sarawak Skills, will host the 4th BIMP-EAGA TVET Conference. This initiative aims to align our workforce with global standards, making us a regional leader in talent development and competitiveness.
The Sarawak Career and Training Fair (SCaT Fair) is an annual programme, jointly organised by my ministry and Tabung Ekonomi Gagasan Anak Sarawak (TEGAS). It is a platform to bring education, training and employment opportunities to school leavers and job seekers. This year SCaT Fair, held in Kuching and Sibu, attracted approximately 30,000 visitors. PETRONAS as a strategic partner offered more than 700 vacancies across various sectors within the oil and gas industry. Additionally, my ministry in collaboration with Jabatan Pembangunan Kemahiran (JPK) Wilayah Sarawak, will organise the 4th WorldSkills Malaysia Sarawak (WMS) in 2025.
For the information of the Honourable Member for Daro, Daro lagi. While no universities currently offers specific shipbuilding programmes, the University Technology of Sarawak (UTS) is taking a significant step to address this gap. They will introduce a Bachelor of Marine Engineering Technology with Honours programme in 2025, with an initial cohort of 20 students. This initiative marks a significant step towards developing local talent for the shipping industry. However, to meet the growing demand for skilled manpower in the shipping industry, TVET institutions offer a range of programmes, including welding, mechanical engineering, and electrical works, to equip individuals with the necessary skills for various shipboard roles. I would like to invite companies from the shipping industry to come forward and collaborate with our state-owned training and education institutions to design and implement industry relevant training programmes.
For the information of the Honourable Member for Lingga, Sarawak Skills has established a new campus in Sri Aman, offering Sijil Kemahiran Malaysia or (SKM) programmes in oil palm plantation, electrical, and computer systems. The campus is currently enrolling 25 students in the electrical programme, with plans to expand enrolment capacity to 150 students across various disciplines. To further enhance the capacity, Sarawak Skills has acquired a 14-acre site in Sri Aman. This new campus will accommodate up to 750 students and offer a wide range of programmes, including Paddy Planting and aquaculture. The official launch of the Sri Aman campus is scheduled for 30th November 2024. We encourage the people of Lingga to visit the campus and explore the opportunities available. Not just Lingga lah everybody is invited.
Sarawak Tropical Peat Research Institute (Tropi)
Tuan Speaker, I will now move to agencies within my ministry. This year, the TROPI received the Tan Sri Emeritus Professor Augustine Ong International Award for Lifetime Achievement, an award conferred by the Malaysian Oil Scientists and Technologists Association or (MOSTA), a testament to TROPI’s contributions to sustainable oil palm cultivation and climate change mitigation. TROPI with their international research partnerships, under the European Research Council Advanced Grant, awarded three PhD scholarships via the University of Tartu in Estonia. To further develop their research capacity, TROPI has 15 of their researchers pursuing postgraduate studies. TROPI was also selected under the FLUXNET Secondment Program to host a Fulbright scholar from the United States.
This year, TROPI has published five scientific papers in high-impact journals and presented 41 conference papers. One of the international symposiums held this year in Kuching was the 15th International Sago Symposium, which was jointly organized with the Ministry of Food Industry, Commodity and Regional Development (M-FICORD), thank you to you and other agencies. When I say thank you it is to the Minister for M-FICORD and also to the Minister for Woman and Family Affairs. The Food and Agriculture Organization (FAO) has highly commended the event for its dual focus on food security and environmental restoration, emphasizing its strong alignment with urgent global priorities in addressing climate change.
Building on the success of the Sago Symposium, TROPI has been invited by several plantations, starting with SD Guthrie in Bintulu Division, to use the sago palm for their peatland restoration program. The role sago palm in stabilizing carbon pools and reducing carbon emission is in line with Malaysia’s National Determined Contribution (NDC) target to reduce the carbon intensity by 45% of GDP by 2030. In addition, restored peatland act as important carbon sinks, directly supporting Malaysia’s commitment to achieve nett zero emission by 2050. SARAWAK BIODIVERSITY CENTRE (SBC)
Tuan Speaker, the World Intellectual Property Organization (WIPO) the new treaty will significantly strengthen SBC's effort to safeguard Sarawak's unique biodiversity. The treaty requires the disclosure of the origins of raw materials and protecting intellectual property, especially traditional knowledge. In connection to this, I am proud to inform this august House, that Sarawak is leading internationally in the implementation of access and benefit sharing.
During the Conference of Parties (COP16) in October held in Columbia, SBC represented the Malaysian delegation in showcasing the nation’s very first Benefit Sharing Agreement on the LitSara. LitSara is a registered trademark project. This recognition by the United Nations is a testament of Sarawak’s sustainability drive in Environment, Social and Governance (ESG) on our biodiversity and indigenous communities.
Sarawak Research And Development Council (Srdc)
Tuan Speaker, from 2019 to 2024, SRDC funded RM16.6 million worth of 79 innovative projects, as of today, 58% of these projects have been completed, while 42% is ongoing. These have resulted in 28 publications in Tier 1 and 2 journals, 14 filed Intellectual Properties, and the ongoing training of 24 PhD and 22 Master’s Degree students.
Now on the construction of the Sarawak Science Centre. Thank you to the Right Honourable Premier for the RM135 million 2025 allocation for the construction of the centre. I would like to update this august House that the construction progress is now at 43% completion, and I am very confident that it would be completed by the end of 2025.
Sarawak Infectious Disease Centre (Sidc)
Tuan Speaker, for SIDC’s vaccine development programme, the centre has become a member of the UK-SEA Vaccine Hub and is actively collaborating with Hilleman Laboratories (Singapore), Biotec (Thailand), and the University of Sheffield (UK). This collaboration involve the transfer of critical knowledge and vaccine platform technology to Sarawak, facilitating future vaccine manufacturing and distribution.
SIDC has established partnerships with local agencies and international entities such as the Swiss Tropical and Public Health Institute (Swiss TPHI), Bioneer and SD Biosensors from South Korea to enhance diagnostics and disease surveillance for targeted disease such as, Tuberculosis, Malaria, Rabies, and African Swine Fever Virus (ASFV).
SIDC is dedicated to developing a skilled biomedical workforce. My ministry through the SIDC is collaborating with Murdoch University through initiatives like the SIDC-Murdoch University Joint Research and Training Centre supported by the Australian Awards Fellowship worth AUD 300,000 from Australia’s Department of Foreign Affairs and Trade (DFAT), this initiative allows 10 SIDC staff members to undertake specialised training at Murdoch University in Perth, starting February 2025. To support these strategic areas, SIDC has successfully secured extramural funding totalling RM1.2 million for field testing tools and researcher capacity building.
Smd Semiconductor
Tuan Speaker, to date, SMD Academy has successfully completed its first cohort and is currently progressing through the second cohort, which will be completed in February next year.
I am proud to share that a total of 33 graduates have completed this training and are now employed within the local semiconductor sector, contributing directly to Sarawak’s growth in this critical industry. Next year, my ministry would like to expand the scope and reach of this Chip Designing programme to our local universities, such as the Swinburne University and Curtin University, for the post-graduate and research collaboration programmes, continuously refining our curriculum and strengthening partnerships with industry leaders.
Craun Research Sdn. Bhd.
Tuan Speaker, Craun has pioneered a technological solution for determining the starch content in post-harvest sago stem cuttings or sago logs. This innovative technology is called SQPro. It is crucial for providing a reliable method to assess the quality of sago logs through their estimated extractable starch. To protect this innovation, a patent application has been filed with MyIPO.
To date, Craun has identified several sago palm varieties that are capable of doubling starch yield. These varieties can produce up to 300 kg of starch per trunk. Craun’s focus is on mass-producing these high-yielding varieties through tissue culture and sucker propagation. This advancement is expected to enhance Sarawak’s starch production, potentially increasing the annual export volume of sago starch to 100,000 metric tons, valued at RM300 million based on the current price of RM3,000 per metric ton.
Sarawak Skills
Tuan Speaker, this institution has received the Certificate of Excellence in the 2024 HRD Awards for the category of Sarawak’s Large Employee with more than 75 employees in the services sector. Sarawak Skills is embarking on several initiatives to enhance workforce training in key sectors especially:
(a) Floating Solar Training Programme; (b) Smart Home Initiative; (c) Bintulu Satellite Campus; (d) Establishment of a new branch campus in Sri Aman;as I mention earlier and, (e) Energy Transition Programme for Automotive Sector;
In addition, Sarawak Skills has also identified several other initiatives tailored to the needs of industry players, which include:
(a) Digital TVET Learning Modules; (b) Establishment of Hydrogen Hub Centre; (c) SAGO Training Programme; (d) Harvesting Specialists Training; (e) ART Project Workforce Development; (f) Retrofit Technology Programme; and (g) AI Training Initiative.
These efforts demonstrate Sarawak Skill’s commitment to advancing technical education and workforce development across various sectors.
Centre Of Technology Excellence Sarawak (Centexs)
Tuan Speaker, I am proud to announce in this august House that the Aerospace Academy at CENTEXS Lundu was launched by the Right Honourable Premier on 8th October 2024. This academy will be a central training ground to equip our future talents with aerospace industries.
I am pleased to inform that CENTEXS has been awarded the Best Industry-based Training Institution during the Malaysian Education and TVET Awards 2024, highlighting CENTEXS commitment in offering industry-based competency training programmes. To the Honourable Member for Tanjong Datu, Tupong, Balingian and Pujut, thank you for your support.
As we look forward, my ministry will continue to support Sarawak's strategic goals, ensuring that our educational initiatives, partnerships, and talent development programmes foster an inclusive, innovative, and prosperous future for all. Tuan Speaker, developing human capital through education is a long and arduous undertaking. This is so true that as quoted by Benjamin Franklin, “Investing in people pays the best interest.”
To conclude, I would like to express my deepest appreciation to the Honourable State Secretary, State Attorney General and State Financial Secretary as well as all ministries, departments and agencies, both state and federal, that have rendered their assistance to my ministry. And, not forgetting, to all officers and staff of my own ministry and agencies, who have worked tirelessly to ensure that the work runs smoothy.
I would also like to express my highest appreciation and congratulations to you, Sir, Tuan Speaker, Deputy Speaker, as well as the officers and staff of the State Legislative Assembly who have efficiently managed this session. Before I take my seat, I wish all Christians in this august House and outside, a Merry and Blessed Christmas. And to everyone, a happy and prosperous New Year 2025. With those words, I hereby support the Budget and the Motion for the Budget 2025. Thank you, Tuan Speaker. (Applause).
With respect, I invite the Honourable Dato Sri Haji Julaihi bin Haji Narawi, Minister of Utilities and Telecommunications, to deliver the winding-up speech.
Thank you, Mr Speaker, for allowing me to deliver the winding-up speech for the Sarawak Ministry of Utilities and Telecommunications.
First of all, I would like to take this opportunity to extend my warmest congratulations to His Excellency the Yang di-Pertua Negeri of Sarawak on his appointment as Chancellor of UNIMAS. I also wish to extend my heartiest congratulations to the Honourable Premier of Sarawak on the two awards conferred this year. The awards are the Star of the Order of Setia Negara Brunei Darussalam, Yang Amat Bahagia First Class (P.S.N.B.), from the Sultan of Brunei Darussalam in July, and the Sri Panglima Darjah Kinabalu (SPDK) award in conjunction with the 71st Official Birthday of the Yang di-Pertua Negeri of Sabah, in October this year. These awards are a recognition of the contributions of the Honourable Premier of Sarawak beyond the territory of Sarawak.
On this occasion, I also wish to congratulate the Honourable Premier of Sarawak on the tabling of the Supply (2025) Bil, 2024l, which shows the concern of the Sarawak Government for the welfare of the people by allocating the largest amount in the history of the Sarawak Budget, totalling RM15.8 billion. Thank you, Honourable Premier of Sarawak.
Mr Speaker, I would like to record my appreciation to the Honourable Premier of Sarawak for providing a large allocation of RM1.72 billion to my ministry, the Ministry of Utilities and Telecommunications Sarawak. The development of utilities and telecommunications will continue in order to achieve full coverage in efforts to make Sarawak a developed and high-income state in line with the Post COVID-19 Development Strategy 2030 (PCDS 2030). This commitment is also in line with the international agreements of the Sustainable Development Goals (SDGs) and Environmental, Social and Governance (ESG).
I would like to record my thanks to the Honourable Members who took part in the debate in the House on issues under the responsibility of my ministry. All suggestions and comments that have been put forward will be taken into consideration for appropriate action.
Water Supply
Mr Speaker, now I would like to touch on the latest developments regarding water supply development in Sarawak. So far, water supply coverage across Sarawak is 85.4% and coverage in rural areas is at 70.5%. Sarawak requires an allocation of more than RM20 billion to achieve full water supply coverage in line with the Sarawak Water Supply and Water Grid Master Plan.
My ministry is always committed and will continue to increase efforts to provide water supply facilities so that the people in every corner of Sarawak can enjoy clean, treated and sufficient water supply.
Water Supply Grid Programme for Stressed Areas
For the information of this honourable House, since 2018 a total of RM4 billion under Alternative Funding involving 304 projects has been allocated by the Sarawak Government to implement the Water Supply Grid Programme for Stressed Areas. This programme is now in its final phase, with the progress of projects as follows:
(a) 269 projects, equivalent to 88%, have been completed;
(b) 27 projects, equivalent to 9%, are under construction; and
(c) the remaining eight (8) projects, equivalent to 3%, are at the pre-contract stage and will commence in 2025.
The main projects that have been completed are as follows:
(a) The upgrading of the Batu Kitang Water Treatment Plant from 764 million litres of water per day (JLH) to 868 million litres of water per day (JLH), at a project cost totalling RM107.2 million. This has increased the water reserve margin for the Batu Kitang treatment plant from 5% to 13.6%;
(b) The Water Supply Project, covering pipe installation works, construction of high-level water tanks and booster pump stations from Kota Samarahan to Sebuyau, including Tambirat, Moyan, Asajaya, Semera, Sadong Jaya, Sungai Buloh, Sungai Ladong, Sebangan and Tebelu, at a project cost totalling RM370.3 million;
(c) The New Water Pipeline Installation Project from Bulatan Junction to the Temadak Storage Tank, at a project cost totalling RM26.6 million;
(d) The Construction of the New Trusan, Lawas Water Treatment Plant with a capacity of 20 million litres per day (JLH), at a project cost totalling RM33.3 million. This has increased the reserve margin to 20%;
(e) The Repair and Rehabilitation of the Water Supply System in Matu and Igan, Mukah, at a project cost totalling RM65.3 million; and
(f) The Sare Water Supply Project, Sarikei, at a project cost totalling RM9.9 million.
Mr Speaker, the main projects currently under construction are as follows:
(a) The upgrading of the Lubau Water Treatment Plant, Betong, from 30 million litres per day (JLH), which currently has no reserve margin, to 60 million litres per day, at a project cost totalling RM168.5 million;
(b) The Tinjar Area Water Supply Project Phase 2 (Package 1 and Package 2), at a project cost totalling RM74 million;
(c) The Water Supply Project along Jalan Bakun from Labang to Tubau, Bintulu (Package 1 and Package 2), at a project cost totalling RM151.6 million;
(d) The Miri Water Source Development Project (Phase 2), at a project cost totalling RM263.9 million;
(e) The Water Supply Project from the Salim Water Treatment Plant to Kanowit, at a project cost totalling RM81.1 million; and
(f) The Water Supply Project to Ulu Rimbas and the Improvement of the Water Supply to Spaoh, at a project cost totalling RM26.6 million.
Meanwhile, the main projects expected to be completed by the end of this year are as follows:
(a) The upgrading of the Bayong Water Treatment Plant, Sarikei, from 70 million litres of water per day to 100 million litres of water per day, at a project cost totalling RM68.6 million. This will increase the reserve margin to 20%. The Bayong Sarikei water treatment plant currently has no reserve margin at all. Therefore, we hope that with the completion of this project, it will certainly bring relief to residents in Bandar Sarikei and the surrounding areas;
(b) The Clean Water Connection Project to Sungai Teniku, Miri, at a project cost totalling RM6.9 million; and
(c) The Pulau Bruit Water Supply System Project, at a project cost totalling RM84.4 million. Once this project is fully completed, the Pulau Bruit Water Supply System will receive water supply from the Tanjung Manis Water Treatment Plant.
In fact, Mr Speaker, I recently conducted a site visit to the Pulau Bruit Project area together with the Honourable Deputy Minister, who is also the Honourable Member for Semop, and I thank him for kindly joining our site visit. This is because a joint visit will provide up-to-date information on what is happening in the relevant areas. Thank you, the Honourable Member for Semop.
Sarawak Water Supply Project under the Twelfth Malaysia Plan (RMK-12)
Mr Speaker, the Sarawak Government has approved a ceiling allocation totalling RM610.4 million under the Twelfth Malaysia Plan to implement 103 Water Supply Projects across Sarawak.
As informed in the previous sitting, among the main scopes for projects being and to be implemented under the Twelfth Malaysia Plan are to build new or upgrade water treatment plants, booster pump stations, water storage tanks, high-level water tanks and install new pipelines. These projects are now at various stages of implementation, where 16 projects have been completed, 13 projects are under construction and 74 projects are at the design stage. The main projects being implemented are as follows:
(a) The upgrading of the capacity of the Batu Kitang Water Treatment Plant (Plant 4), which will increase the plant's total production capacity from 868 million litres of water per day at present to 968 million litres of water per day, is under construction. This means that the Batu Kitang Water Treatment Plant will have a higher capacity in the future when this project is completed as scheduled;
(b) The upgrading of the Salim Water Treatment Plant, Sibu, from 150 million litres of water per day to 300 million litres of water per day commenced in the second quarter of last year, 2024. Once this project is completed, it will increase the reserve margin of the Salim Water Treatment Plant, Sibu, to 40%. For the information of this honourable House, at present the Salim Water Treatment Plant in Sibu has no reserve margin at all, and this is why we need to complete the Upgrading of the Salim Water Treatment Plant, Sibu, to 300 million litres of water per day, and we hope that this increase in the reserve margin will be able to solve this problem one day; and
(c) The Serian Regional Water Supply Phase II Project and the Betong Division Raw Water Source Project commenced in the third quarter of 2024.
Mr Speaker, meanwhile, the main projects to be implemented are as follows:
(a) The construction of a new water treatment plant at Landeh with a capacity of 200 million litres of water per day, at Lundu with a capacity of 20 million litres of water per day, Engkilili 75 million litres of water per day, Kanowit 25 million litres of water per day, Kapit 30 million litres of water per day, Song 20 million litres of water per day, Beluru 75 million litres of water per day, Lawas 20 million litres of water per day and Trusan 50 million litres of water per day, currently at the design stage;
(b) The upgrading of water treatment plants at Kaki Wong 30 million litres of water per day, Mukah 60 million litres of water per day, Belaga 5 million litres of water per day, Sungai Asap 5 million litres of water per day, Nyabau 200 million litres of water per day, Samalaju 80 million litres of water per day, Suai 15 million litres of water per day and Long Lama 8 million litres of water per day, currently at the design stage; and
(c) The construction of a water grid system covering booster pump stations, water storage tanks, high-level water tanks and installation of new pipelines in all divisions in Sarawak.
Acute Water Treatment Plant Approach
Mr Speaker, while waiting for the main water treatment plants to be completed as planned in the Sarawak Water Supply and Water Grid Master Plan, my ministry, through the Rural Water Supply Department of Sarawak (JBALB), has implemented the Acute Water Treatment Plant initiative in critical areas facing water shortages as a short-term solution.
The implementation of the Acute Water Treatment Plants has been able to address water shortage problems in critical areas such as Sematan, Lundu, Sungai Serin Serian, Pusa, Spaoh, Beladin, Maludam, Lubau, Temadak, Kanowit and Long Lama.
My ministry is also implementing and will implement nine more Acute Water Treatment Plants at Sungai Sadit, Daro, Lichok, Song, Puncak Borneo, Lingga, Nibong Tada, Suai and Temadak to address the water supply shortage in those areas.
Programme for the Upgrading and Replacement of Old and Dilapidated Pipes
Mr Speaker, as informed in the previous sitting, there are 2,740 km of old and dilapidated water pipes still in use in the water distribution system across Sarawak. This is one of the main contributors to the high Non-Revenue Water, (NRW) in Sarawak, which is currently at 43%.
To address this problem, the Sarawak Government has allocated as much as RM1.085 billion to implement a programme to upgrade and replace old and dilapidated pipes across Sarawak in phases over a five-year period.
The water supply agencies are now actively carrying out survey works, preparation of drawings, preparation of tender documents and tender invitations. A total of 13 projects have started or will start construction at the end of this year, while 45 more projects will commence in the first quarter of 2025.
So, Mr Speaker, we are aggressively trying to replace and upgrade our distribution pipes statewide as this is very critical to increase and maintain our water supply system and water pressure in the near future statewide.
Penalty Rates for Damage to the Water Supply System by Third Parties
Recently, Mr Speaker, we have frequently experienced water supply disruptions caused by the negligence of third parties, including contractors while carrying out construction works. Not least, damage to our distribution pipes is also caused by the negligence of other parties, such as traffic accidents, and also by acts of vandalism that cause damage to our distribution pipes wherever in Sarawak.
Damage that occurs to pipelines takes quite a long time to repair and affects water supply services. This also makes daily activities difficult for consumers, besides giving a bad image to the water supply agency. Such damage also causes the water supply agency to face difficulties in detecting the damage and carrying out repair works on the damaged pipes. The relevant water supply agency also suffers losses in terms of loss of Non-Revenue Water, (NRW).
The penalty imposed on parties who cause damage to the water supply system is also low at present compared with penalties elsewhere. In Sarawak, for example, the penalty imposed for a first offence is only RM5,000, excluding the cost of repairing the damage, compared with Peninsular Malaysia and Sabah where it now does not exceed RM50,000. So, we see that the penalty imposed in Sarawak is too low right now. Meanwhile, we are also aware that in Singapore the penalty is higher, not exceeding SGD40,000, compared with Malaysia. If we multiply by three, it means the penalty imposed in Singapore is far higher, Mr Speaker.
Therefore, my ministry takes this matter seriously and is studying the possibility of amending the relevant sections of the Water Ordinance, 1994. This Water Ordinance is what we are currently studying to see how we can consider increasing the penalty in the future. This aims to impose higher penalties and commensurate punishment on those who are negligent and cause damage to the water supply system in Sarawak one day.
Site Preparation and Water Storage Tank Requirements
Mr Speaker, my ministry notes that there are several existing developed areas experiencing water supply problems because of high population density and high water demand. This causes low water pressure in the areas concerned, especially during peak hours. For example, this issue occurs at Taman Pine Square in Bahagian Kuching, Taman Samarindah Stakan, Taman Uni Central, Taman Uni Vista and Uni Garden in Bahagian Samarahan, Flat Sibu Jaya in Bahagian Sibu and Taman Jelita in Bahagian Miri.
Therefore, Mr Speaker, my ministry will work with the relevant ministries and agencies to thoroughly assess water supply needs before any development project is approved. This includes site preparation and the construction of water storage tanks (reservoirs) as a mandatory requirement that must be complied with by all developers.
These storage tanks are very important to ensure sufficient water supply and consistent water pressure to consumers in the event of a water supply disruption. In addition, consistent water pressure is also important to assist the fire department in the event of a fire.
Furthermore, Mr Speaker, I would like to propose that, in addition to the provision of water storage tanks in residential areas, roof water tanks or private water tanks should become one of the important requirements that should be considered before any development project is approved. This is to ensure that water supply at homes is not cut off in the event of a water supply disruption. I would like to call on all consumers to ensure that the existing roof water tanks at their homes are maintained so that the water supply continues to be assured.
Establishment of One Entity for Sarawak Water Supply
There are four water supply management agencies in Sarawak, namely the Rural Water Supply Department of Sarawak (JBALB), the Kuching Water Board (KWB), the Sibu Water Board (SWB) and LAKU Management Sdn. Bhd. (LAKU).
To improve water management to be more efficient, the Sarawak Government has approved the merger of the water supply agencies involving the Kuching Water Board (KWB), the Sibu Water Board (SWB) and LAKU Management Sdn. Bhd. (LAKU), by establishing a single water supply entity that is expected to begin operations in the near future.
Meanwhile, for the time being JBALB remains a department responsible for providing water supply infrastructure, mainly in rural areas. JBALB will also become part of the single water entity in the future.
Borneo International Water and Wastewater Exhibition and Conference 2024 (BIWWEC 2024)
Mr Speaker, I am pleased to inform this honourable House that the Borneo International Water and Wastewater Exhibition and Conference 2024 (BIWWEC 2024) was held from 23 to 25 October last year. The conference successfully attracted the participation of 1,900 delegates, 60 speakers and 63 exhibitors from 20 countries. The conference is a prelude to Kuching City hosting the International Water Association World Water Congress and Exhibition 2028.
So, we will be hosting the International Water Association World Water Congress and Exhibition in 2028, and this is a source of pride because this is the first time Malaysia has been selected as the host country, in fact the first in Asia, and because of that, we were required to attend the recent International Water Association Congress and Exhibition in Toronto, Canada. This was because we needed to carry out promotion and a soft launch during the Toronto conference. This is for the information of this honourable House.
Implementation of Federal Government-Funded Water Supply Projects in Sarawak
Mr Speaker, for the information of this honourable House, apart from the large allocation provided by the Sarawak Government itself to implement water supply projects in Sarawak, we also receive allocations from the Federal Government through the Rural Water Supply (BALB) programme. However, based on the Auditor General's Report 2023 Series 1, a total of 12 Rural Water Supply Projects approved between 2016 and 2018 have still not commenced and have not been implemented.
Accordingly, to facilitate the implementation of water supply projects in Sarawak approved by the Federal Government, I have proposed that the allocation for Rural Water Supply Projects approved by the Federal Government be channelled directly to the Sarawak Government, adopting the Sarawak Government Financial Procedures. I also urge that the Rural Water Supply Department of Sarawak (JBALB) be immediately recognised as a Technical Department by the Federal Government to expedite the implementation of Rural Water Supply Projects approved by the Federal Government in Sarawak. And I hope that will be duly considered by the Federal Government in due course. Thank you, Tamin.
Electricity Supply
Sarawak Electricity Supply Capacity
Mr Speaker, now I would like to touch on electricity supply. For the information of this honourable House, the electricity generation capacity in Sarawak is 5,745 megawatts. Meanwhile, current electricity demand is 4,720 megawatts and is expected to rise to 6,700 megawatts by 2030.
Sarawak targets a generation capacity of 10,000 megawatts, equivalent to 10 gigawatts, by 2030, and thereafter 15,000 megawatts, or equivalent to 15 gigawatts, by 2035, through various energy sources, especially renewable energy. To achieve these targets, the projects under implementation are as follows:
(a) Floating solar system at Batang Ai with a capacity of up to 50 megawatts, which is expected to be fully completed at the end of this December;
(b) Baleh Hydroelectric Power Station with a capacity of 1,285 megawatts is under construction and is expected to begin operations in the fourth quarter of 2029;
(c) Miri Combined Cycle Power Plant (CCPP) with a capacity of 500 megawatts is under construction and is expected to be fully completed in the fourth quarter of 2027; and
(d) Samalaju Combined Cycle Power Plant (CCPP) with a capacity of 1,500 megawatts is expected to begin operations in the second quarter of 2027.
Mr Speaker, meanwhile, the projects under study are as follows:
(a) Kuching Combined Cycle Power Plant (CCPP) with a capacity of 5,000 megawatts;
(b) Large Scale Solar (LSS) with a potential capacity of up to 2,000 megawatts; and
(c) Cascading power sources in the river basins of Sarawak with a potential capacity of up to 3,000 megawatts.
Rural Electricity Supply (BELB)
For the information of Members of this honourable House, currently the overall electricity supply coverage across Sarawak is 99.4%, while coverage in rural areas is 98.6%. Sarawak requires an allocation exceeding RM4 billion to realise full coverage as well as improvements to electricity supply in line with the Post COVID-19 Development Strategy (PCDS) 2030.
The Sarawak Government has provided an allocation of RM2.38 billion under Alternative Funding to implement electricity supply projects in rural areas involving 211 projects. The progress of the Rural Electricity Supply (BELB) projects is as follows:
(a) 152 projects, equivalent to 72%, have been completed; (b) 50 projects, equivalent to 23.7%, are in the implementation stage; and (c) the remaining nine projects, namely 4.3%, are at the tender stage and are expected to commence in the first quarter of 2025.
In addition, Mr Speaker, the Sarawak Government also approved an allocation of RM50.5 million to implement three more projects under the Twelfth Malaysia Plan (RMK-12). Two of these projects are at the construction stage, while the remaining one project is at the tender stage and is expected to commence in the first quarter of 2025.
Additional And Late Applicant Fund (Alaf)
For the information of this honourable House, the Sarawak Government has approved an allocation of RM315 million to implement the ALAF project from phase 1 to phase 4, involving 21,073 households across Sarawak. The progress of implementation of this project is as follows:
(a) 18,568 households, equivalent to 88.1%, have been completed; (b) 1,819 households, equivalent to 8.6%, are under construction; and (c) the remaining 686 households, equivalent to 3.3%, are at the design stage.
The implementation of the ALAF project continues, with new applications estimated at 30,600 households under the Thirteenth Malaysia Plan (RMK-13). The implementation of this project is expected to involve a cost of RM550 million. So, the number is still big, Tuan Speaker, and they have to wait in the queue. So, saya juga ingin tegaskan di sini mengikut peraturan kita tidak menggalakkan mana-mana pihak yang memotong queue because the number waiting for approval implementation is still big which is about 30,600 households right now.
For the information of this honourable House as well, we still face the challenge of a shortage of contractors and competent persons registered with Sarawak Energy Berhad (SEB). So far, a total of 25 contractors and 43 competent persons are involved in implementing the ALAF project across Sarawak. My ministry will facilitate the registration of contractors and competent persons in cooperation with Sarawak Energy Berhad (SEB) so that we can implement this ALAF project more quickly.
Sarawak Grid Transmission System (Sarawak Grid Transmission System)
For the information of this honourable House, the Sarawak Grid Transmission System (Sarawak Grid Transmission System) currently consists of the following:
(a) 275 kV transmission line spanning 3,635 km from Miri to Kuching as the main backbone of the Sarawak Grid;
(b) 500 kV transmission line as a supplementary backbone spanning 1,030 km from Similajau Bintulu to Tondong, Bau;
(c) 132 kV transmission line as a regional grid spanning 1,244 km in major urban areas in Kuching, Sibu, Bintulu and Miri.
The existing grid transmission system is able to accommodate a generation capacity of 10 gigawatts, namely 10,000 megawatts, by 2030. This generation capacity of 10 gigawatts or 10,000 megawatts also includes the Baleh Hydroelectric Power Station, the Samalaju and Miri Combined Cycle Power Plants (CCPP), and Large Scale Solar (LSS). Sarawak Energy is actively developing the Sarawak Grid to ensure sustainable electricity supply in the future by considering the following factors:
(a) Growth in local energy supply demand; (b) Cross-border export and energy exchange; and
(c) Additional generation from various sources, including renewable energy, in line with the target of 15 gigawatts or 15,000 megawatts by 2035.
Meaning that we have to standby and get ready all the grid system statewide in the nearest future in view we are targeting to achieve 15,000 Megawatt or equivalent to 15 Gigawatt by the year 2025.
Therefore, Sarawak Energy plans to increase the capacity of the main grid lines to achieve this target of 15 gigawatts. In addition, Independent Power Producers (IPPs) that plan to develop new generation may need to build additional lines to connect to the main Sarawak grid lines.
One of the major projects that has been completed is the 500 kV grid transmission line starting from Similajau Bintulu heading to Mapai Sibu and onward to Tondong Bau in Sarawak. The 500 kV grid transmission network is currently energised at a voltage of 275 kV and will be energised at a voltage of 500 kV when the Baleh Hydroelectric Power Station begins operations (energised) in the fourth quarter of 2029.
Another transmission line project being implemented is the 500 kV line from Similajau Bintulu to Bunut Miri and the 275 kV line from Bunut Miri to Medamit Limbang and Lawas and onward to Sabah. As of September 2024, the progress of this project has reached 88% completion and it is expected to begin operations (energised) in the second quarter of 2025.
Improvement of Electricity Supply System Quality
In an effort to overcome the problem of frequent electricity supply interruptions, my ministry, through Sarawak Energy, has and is improving line performance by taking the following actions:
(a) Identifying main lines that frequently experience electricity supply disruptions through the monitoring method of Intensive Care Feeders (ICF). A total of 33 main lines have been identified and improvement actions are being implemented;
(b) Installing Remote Line Fault Indicators (LFI) to speed up the detection of the location of the cause of supply disruptions on distribution lines. A total of 663 LFIs have been installed on distribution lines across Sarawak as follows:
(i) 198 LFIs in Kuching, Samarahan, Sri Aman, Betong and Saratok; (ii) 195 LFIs in Sarikei, Mukah, Daro, Matu and Sibu; (iii) 103 LFIs in Bintulu, Samalaju and Murum; and (iv) 167 LFIs in Miri, Limbang and Lawas.
(c) The Overhead Line Distribution Network in Sarawak is estimated to exceed 11,500 km. Overhead distribution lines without insulation (bare conductor) exceeding 30 km in length are often exposed to disruptions. Among them are those from:
(i) Asajaya to Sadong Jaya; (ii) Simunjan to Sebuyau; (iii) Jaong near the Simunjan to Gedong junction; (iv) Lachau to Temudok; (v) Betong to Serudit; (vi) Pusa to Saratok; (vii) Kabong to Sarikei; (viii) Kemantan Bintangor to Julau; (ix) Bintangor to Pakan; (x) Mapai to Nibong Tada; (xi) Song to Kapit; (xii) Selangau to Mukah; (xiii) Petian to Dalat; (xiv) Daro to Pergau; (xv) Similajau to Sungai Asap; (xvi) Marudi Junction to Niah; (xvii) Lambir to Batu Niah; and (xviii) Limbang to Medamit.
The lines I mentioned just now, Mr Speaker, are old lines that use the conventional uninsulated system (bare conductor). Meanwhile, new distribution lines now use covered conductors.
As a solution, Sarawak Energy has and will immediately take several urgent actions. Among the new distribution line projects that have adopted covered conductor technology, or Medium Voltage Covered Conductor (MVCC), are as follows:
(i) Petian to Dalat, 36 km long at a cost of RM21.9 million; (ii) Kanowit to Nanga Ngungun, 34 km long at a cost of RM20.4 million; (iii) Murum Junction to Belaga, 59 km long at a cost of RM38 million; (iv) Tatau to Sangan, 28.5 km long at a cost of RM16.3 million; and (v) Similajau to Sebauh, 52 km long at a cost of RM31.3 million;
(d) Meanwhile, Mr Speaker, Medium Voltage Covered Conductor (MVCC) technology will also be adopted in Samarahan Division to upgrade lines spanning 134.2 km from Asajaya to Batang Sadong, Sebuyau, Simunjan and Gedong at a total cost of RM150 million;
(e) Installing the Distribution Remote Monitoring System (DRMS) surveillance system to provide immediate alerts if intrusion occurs within substations. A total of 1,300 substations across Sarawak have been equipped with this system;
(f) Upgrading 169 transformers across Sarawak since 2022 to cope with increased local load at a total cost of RM20.8 million;
(g) Building new 275 kV and 33 kV substations and improving existing substations, namely:
(i) Batu Kawa, Pending, Batu Lintang, Moyan, Belian Stabil (near the Samarahan Expressway), Landeh, Batu Kitang, 12th Mile, Mambong, Biawak, Kuching Bypass, CENTEX, Lundu and Lundu Town in the Kuching division at a cost of RM218.6 million;
(ii) Next, in Sabu in Sri Aman Division at a cost of RM25 million; there is also a place called Sabu in Sri Aman Division;
(iii) Next, Sarikei Town and Kelupu in Sarikei Division at a cost of RM59.7 million;
(iv) From Kemunyang, Sg. Merah, Ensurai and Upper Lanang in Sibu at a cost of RM134.2 million; (v) At Tg. Manis in Sarikei at a cost of RM14 million;
(vi) At Kapit Town, Nanga Mujong, Tunoh Junction, Tunoh and Nanga Merit in Kapit at a cost of RM111 million;
(vii) Sibiyu, Bintulu B, Likau, Taman Lucky, Kidurong B, Nyabau, Sebaru, UPM, Kidurong, Jepak and Belaga in Bintulu Division at a cost of RM590 million;
(viii) Long Lama, Jee Foh, Niah, South Lake, North City, Kuala Baram, Tudan A, Marudi, Mulu and Long Panai in Miri at a cost of RM374.5 million;
(ix) Next, in Limbang Town, Integrated Administrative Center (IAC) Limbang and Semendango in Limbang at a cost of RM187 million;
(x) Next, in Lawas Town, Temangis and Simpang Sundar in Lawas at a cost of RM196 million; and another one is
(xi) drone monitoring to maintain overhead lines in areas that are difficult to access.
I would like to share here Mr Speaker, there are inaccessible areas in Sarawak which is very difficult for our Sarawak Energy's staff to access, so in order to monitor any problem in that area, we have to use drone. So, that is the latest and one of the ways for us to monitor the line in inaccessible areas.
Additional Sources through Renewable Energy
Several additional renewable energy sources that are currently at the study stage in Sarawak are as follows:
(a) Large Scale Solar (LSS), including floating solar at the Bengoh, Bakun, Batang Ai and Murum dams;
(b) Development of Cascading Power Sources in 12 river basins that have been identified for study, namely Sungai Gaat, Sungai Belaga, Sungai Tutoh, Sungai Trusan, Sungai Lawas, Sungai Limbang, Sungai Baram, Sungai Tinjar, Sungai Danum, Sungai Balui, Sungai Bangkit and Sungai Tekalit. In addition, Sarawak Energy is conducting a feasibility study for other river basins in Sarawak, which also involve several areas proposed by the Honourable Members for Kakus and also Mambong;
(c) Pumped Hydro Energy Storage (PHES) at several locations such as Stumbin, Padawan, Bakun and Murum. Pumped Hydro Energy Storage can function as a battery for the Sarawak Grid System and operate in hybrid mode together with Large Scale Solar. The Pumped Hydro Energy Storage system involves, generating, I repeat, the Pumped Hydro Energy Storage system generates energy by pumping water from a low reservoir to a high reservoir, and the water will be released to generate electricity;
(d) Energy sourced from tidal waves is under the cooperation of Sarawak Petchem Sdn. Bhd. and Sarawak Energy, which is currently identifying a suitable technology to develop the potential of a prototype at the Sarawak Petchem Sdn. Bhd. jetty; and
(e) The latest is Ocean Thermal Energy Conversion (OTEC), a renewable energy technology that generates power using the temperature difference between warm sea surface water and cold deep sea water. OTEC will be evaluated in terms of its technical suitability and its potential application in Sarawak. OTEC technology is currently being used in Kumejima, Japan and NELHA in Hawaii.
Net Energy Metering (NEM)
Next, I would like to touch on Net Energy Metering (NEM). The development of the renewable energy sector can also be enhanced through consumer participation in the Net Energy Metering (NEM) Scheme. The NEM Scheme is a metering mechanism based on an energy offset method that will reduce consumers' electricity bills. For information, the estimated cost of installing a rooftop solar system without battery with a capacity of 4 kilowatt peak (kWp) is currently between RM18,000 and RM25,000. So, this is the costing given to me if you were to install it at your respective house.
Following the amendments to the Ordinan Elektrik (Cap. 50) which came into force on 1 February 2024, the installation of solar systems with a capacity of up to 50 kW does not require a generation licence. So, there is no need to have a license if you generate a power up to 50 kW. This is one of the efforts to facilitate and encourage the installation of NEM.
For the information of this honourable House, so far a total of 50 applications have been received under the NEM Scheme with a total capacity exceeding 2,875 kilowatt peak (kWp) since the scheme was introduced. 10 NEM schemes have been completed and have begun operations, while the remaining applications are still at the study stage.
SEB as Single Buyer for Renewable Energy in Sarawak
As this honourable House is well aware, with the gazettement of the Pindaan Ordinan Elektrik 2023 which came into force on 1 February 2024, Sarawak Energy (SEB), as the owner of the Sarawak Main Grid Transmission Lines, has been appointed as the single buyer in Sarawak. This appointment aims to facilitate the procurement of electricity generation through renewable energy sources and ensure that the stability of the Sarawak grid is always guaranteed.
Since the amendment came into force, the Sarawak Government has received applications from private investors to participate in the development of renewable energy generation such as Large Scale Solar (LSS), including floating solar. This shows the confidence of private investors in Sarawak's potential as a renewable energy hub.
For the information of this honourable House, all generation development proposals from renewable energy sources received by the Sarawak Government from private investors will be submitted to the single buyer, namely Sarawak Energy Berhad, for technical evaluation. This evaluation will determine the feasibility of the proposals submitted.
Electricity Exports
Borneo Grid and ASEAN Power Grid
For the information of this august House, with the success of the first interconnection (sambung tara) project of Sarawak to West Kalimantan since 2016, the next step is interconnection to Sabah and Brunei, which will realise the aspiration of the Borneo Grid. This development will facilitate the sharing of energy resources, particularly renewable energy in Borneo, and open the way for broader energy sharing to realise the aspiration of the ASEAN Power Grid.
The ASEAN Power Grid, Mr Speaker, encompasses an infrastructure network of interconnected electricity grids among ASEAN countries to ensure energy security, thereby promoting development and economic growth through the sharing of regional energy resources. The Sarawak Government, through Sarawak Energy Berhad, will implement electricity interconnection projects via submarine cables to Singapore with a capacity of up to 1,000 Megawatts only, and to Peninsular Malaysia with a capacity of 1,000 Megawatts as well.
For the project to interconnect to Singapore, diplomatic engagements between Malaysia, Indonesia and Singapore are currently ongoing, including to obtain approval for the survey of the submarine cable route. Meanwhile, the interconnection to Peninsular Malaysia is currently at the feasibility study stage.
Power Exchange Agreement with Sabah
The Sarawak Government, through Sarawak Energy Berhad, has signed a Power Exchange Agreement with Sabah Electricity Sdn. Bhd. (SESB) with a capacity of 30 Megawatts under the Northern Grid Extension project. The interconnection project with Sabah is expected to begin operations in the second quarter of 2025. Hopefully there is no wayleave problem in the Northern Region so that we can get both Lawas, Limbang and Sabah connected by the year 2025.
The implementation of this project has been delayed due to wayleave problems involving local communities in the Beluru and Telang Usan areas. However, these wayleave problems are being addressed with the cooperation of the Miri Resident's Office, the Beluru District Office, the Telang Usan District Office, the Department of Lands and Surveys, the Sarawak Enforcement and Security Unit (UKPS) and the Royal Malaysia Police (PDRM) through the following activities:
(a) A legal entry operation that proceeded smoothly on 27 August 2024 in the Beluru District;
(b) An engagement session with the Long Meraan community by the Telang Usan District Office on 11 September 2024; and
(c) Various continuing engagement activities with communities in the Beluru and Telang Usan areas since September 2024.
Mr Speaker, now I would like to touch on the distribution of gas…(Interruption)…
Honourable Members, we have a break. Sitting resumes at 11.45 a.m.
(Meeting suspended at 11.24 a.m.)
(Meeting resumed at 12.00 noon)
[Mr Speaker in the Chair]
Sila, teruskan.
Thank you, Mr Speaker. Now, I turn to the topic of gas distribution. Next, I would like to touch on the latest developments regarding gas distribution in Sarawak.
Gas Distribution
PETROS as the Sole Gas Aggregator
As this august House is well aware, the company owned by the Sarawak Government, Petroleum Sarawak Berhad (PETROS), was appointed as the sole Gas Aggregator with effect from 1 February 2024. As the sole Gas Aggregator, PETROS is responsible for carrying out all activities relating to the procurement, supply, distribution and sale of natural gas in Sarawak. The Gas Aggregator is also responsible for planning, development, operation and maintenance of the natural gas distribution network system in Sarawak.
Here, I would like to inform you that the latest development is that PETROS and PETRONAS are in discussions, particularly on technical aspects. I wish to emphasise once again that the appointment of PETROS as the sole Gas Aggregator is final and non-negotiable. This means there is no other Gas Aggregator in Sarawak. There are no other Gas Aggregator in Sarawak.
For the information of this August House, any party carrying out gas distribution activities must apply for a licence under Section 7, Distribution of Gas Ordinance, 2016 (DGO 2016). To date, my ministry has issued retail of gas licences to 13 upstream players and 10 retail of gas licences to downstream players. Failure to comply with these licensing requirements is an offence under Section 20 of the said Ordinance, which may be punished with a fine or imprisonment or both.
Sarawak contributes 60% of the natural gas resources in Malaysia. However, 94% of natural gas production in Sarawak is exported and is not utilised for local industrial development in Sarawak.
The time has come for us to utilise our natural gas resources to advance industry in Sarawak. What is the problem with our efforts in developing Sarawak? Whereas the development of Sarawak also contributes to the growth and prosperity of Malaysia as a whole.
Malaysia comprises Peninsular Malaysia, the Federal Territory of Sarawak and Sabah. Therefore, this is not merely about the interests of Sarawak alone, but also strengthens and enhances the economic sector throughout the country. The time has come for Malaysia's leaders to open their eyes and minds to view the national development perspective more holistically, and not be confined to the development perspective centred only on Putrajaya and Kuala Lumpur. Do not be too centralist.
We respect several views from the intellectuals recently, including the former Minister of Law of Malaysia and the former Minister of Finance of Malaysia who is also the former Chairman of PETRONAS. They are entitled to their own opinions. However, we have anticipated that their views are often one-sided and do not favour Sarawak. Pat your chest, check your appetite.
I record my highest appreciation and thanks to all Honourable Members for their firm support of PETROS as the sole Gas Aggregator in Sarawak. The ongoing efforts of the Sarawak Government to defend the absolute right over Sarawak's natural gas resources must be respected and cannot be disputed by all parties, including PETRONAS and the intellectuals who are always biased in their comments.
This right, which is based on Sarawak law still in force to date, is very important in ensuring our aspiration to fully control natural gas resources for the welfare of the people of Sarawak in particular and the people of Malaysia in general. Therefore, I once again wish to emphasise that the appointment of PETROS as the sole Gas Aggregator is final and non-negotiable. This means there is no other Gas Aggregator in Sarawak apart from PETROS.
Sarawak Gas Roadmap (SGR)
My ministry, through PETROS, is actively carrying out continuous efforts to increase the use of natural gas in Sarawak in line with the Sarawak Gas Roadmap (SGR). The SGR plan covers four strategic hubs, namely in Miri, Samalaju, Bintulu and Kuching, through several initiatives as follows:
(a) The Miri Combined Cycle Power Plant (CCPP) project, with a capacity of 500 MW, is currently in the Engineering, Procurement, Construction and Commissioning (EPCC) phase. This project is expected to begin commercial operations in the fourth quarter of 2027;
(b) The Bintulu – Samalaju Gas Pipeline project, 65 km long and valued at RM1 billion, supplies natural gas from Bintulu to the Samalaju Industrial Park (SIP), including the gas requirements of the Sarawak Energy CCPP. So far, the Bintulu – Samalaju Gas Pipeline project is still in the Engineering, Procurement and Construction (EPC) phase and is expected to be completed by the fourth quarter of 2025;
(c) The Sarawak Energy CCPP in Samalaju, as I mentioned earlier, has a capacity of 1,500 megawatts (MW);
(d) The Sarawak Virtual Pipeline System (VPS) project, which uses trucks equipped with cryogenic tanks to transport liquefied natural gas (LNG) from Bintulu to Kuching, is now at the final stage of commercial discussions. This project is expected to begin operations in the fourth quarter of 2025;
(e) The Kuching Low-Carbon Hub, meanwhile, is to develop a regasification terminal and critical gas infrastructure in Kuching, including plans to build a Kuching Combined Cycle Power Plant (CCPP) that can reach a capacity of 5,000 megawatts;
(f) The Sarawak Gas Roadmap (SGR) also takes into account the interests of all Sarawak people through the initiative of access to natural gas supply to their homes via the Gas Direct to Kitchen programme. This programme began when PETROS installed a natural gas pipeline system at Quadruplex Taman Ceria (QTC) in Permyjaya, Miri. The project involves 3,000 houses and will be implemented in five phases and is expected to be completed in 2027. This natural gas supply access project will be extended throughout Sarawak in the future; and
(g) PETROS has allocated RM100 million to implement a natural gas pipeline network project in Bintulu. This project covers the trunkline and expansion of the network system involving distribution pipelines. The feasibility study will begin in December 2024, that is next month, and the project will be implemented in the second quarter of 2025.
Mr Speaker, these initiatives are part of the Sarawak Gas Roadmap (SGR) plan, which aims to increase the use of existing domestic gas from 6% to at least 30% by 2030. The SGR plan is expected to attract more foreign investors, which will in turn increase economic activity and create more high-income employment opportunities in Sarawak. Recently, the company Mubadala Energy, which is one of the giant companies in the oil and gas industry…(Interruption)…
…(Inaudible)…
Let me finish first. You can ask later on. I can promise you. Don’t worry. Let, let me finish first…(Interruption)…
…(Inaudible)…
No, no. Let me finish first. I haven't finished. You better listen first. Okay?
Recently, Mubadala Energy, one of the giant companies in the oil and gas industry from Abu Dhabi, has expressed its intention to join the development of the Sarawak Gas Roadmap plan in Sarawak during the visit of the Honourable Premier of Sarawak and his delegation to Abu Dhabi on 5 November 2024.
PETROS Niaga Sole Distributor of Subsidised LPG in Sarawak
Mr Speaker, I am pleased to inform the House that PETROS Niaga, a local company owned by PETROS (51%) and PETRONAS Dagangan Berhad (49%), has now succeeded in playing the role of sole distributor of subsidised LPG in Sarawak. The Board of Directors of PETROS Niaga consists of two Directors from PETROS and two Directors from PETRONAS Dagangan Berhad (PDB).
In monitoring all activities involving these subsidised LPG cylinders, my ministry, together with all the parties involved such as the Sarawak Security and Enforcement Unit (UKPS), the Ministry of Domestic Trade and Cost of Living (KPDN), the Fire and Rescue Department, the Local Authorities, the Royal Malaysia Police (PDRM), the General Operations Force (PGA), the Malaysian Armed Forces (ATM), the Customs Department and other related agencies, have actively cooperated in enforcement activities.
Until now, the process of exchanging yellow subsidised LPG cylinders for PETROS subsidised LPG cylinders on a one-to-one basis, without any additional charge, is still ongoing. It is ongoing, Mr Speaker. As of October 2024, PETROS Niaga has exchanged 690,000 yellow LPG cylinders for red PETROS LPG cylinders. There is a picture there. That is the stock yard. Currently, there are approximately 1.8 million PETROS subsidised LPG cylinders available in the market throughout Sarawak.
At the initial stage, PETROS Niaga bore a cost of RM50 million to provide 350,000 new red PETROS LPG cylinders. So far, that cost has increased to RM100 million to add to the total to 700,000 red PETROS LPG cylinders for the smooth running of the one-to-one cylinder exchange process free of charge throughout Sarawak.
So far, it is estimated that more than 95% of yellow LPG cylinders have been exchanged for red PETROS LPG cylinders. Customers who face difficulties in exchanging yellow LPG cylinders for red PETROS subsidised LPG cylinders from distributors are asked to report to PETROS Niaga via the PETROS LPG hotline: 1300-882-122. So, you can call that number anytime. Meanwhile, distributors and sub-distributors who refuse to accept cylinder exchanges will be firmly dealt with. At present, there are 67 distributors and more than 300 sub-distributors throughout Sarawak.
Although there have been some isolated cases, let us work together to resolve the challenges concerning this subsidised LPG cylinder exchange process. For example, Sibu is one of the focal areas in the early stage of this transition. I don't know why always Sibu. Sibu, Sibu, Sibu. So, Sibu is the…it seems to be a problematic area in the earliest stage of the exchange. I don't know for what reason. Representatives of the people in Sibu now accept the role played by PETROS Niaga in the distribution of subsidised LPG cylinders. This cooperation has greatly helped the smooth operation of PETROS LPG in Sibu.
ISO 29001 Certification Initiative (Quality Management for Petroleum, Petrochemical and Natural Gas Industries)
I would like to emphasise Environmental, Social and Governance (ESG) and Sustainable Development Goals (SDGs) for gas industry players in Sarawak. This is important to ensure the sustainability, credibility, safety and quality of operations for the gas sector.
In this regard, my ministry will make it mandatory for gas industry players in Sarawak to include the ISO 29001 (Quality Management for Petroleum, Petrochemical and Natural Gas Industries) certificate as an additional requirement in the licence renewal process, starting in 2026. This measure shows the commitment of the Sarawak Government to safety and sustainability in the gas sector. Therefore, I call on all gas industry players to proactively obtain this certificate earlier as a sign of their commitment to best practices in the industry.
Sarawak Gas Roadmap Summit 2024
For the information of this honourable House, PETROS will organise the Sarawak Gas Roadmap Summit in Kuching on 25 November 2024. This summit will bring together industry leaders, policymakers, local and international experts and investors. The platform will be used to share views on the direction for maximising the potential of gas, strengthening and enhancing the use of gas for domestic needs, and supporting sustainable economic development in Sarawak.
TELECOMMUNICATIONS
Telecommunications Coverage in Sarawak
Next, Mr Speaker, I turn to telecommunications. I would like to convey the latest progress in telecommunications coverage in Sarawak. As previously informed, an estimated 7,000 towers are needed to achieve full internet coverage by 2030.
So far, a total of 4,581 towers (including telecommunication structures on top of buildings) have been completed, compared with 4,447 towers as reported during the last State Legislative Assembly (DUN) sitting in May. A total of 4,027, equivalent to 87.9% of towers, are in operation (on-air), and the remaining 12.1% will begin operating in phases until the end of 2025. Now, internet service coverage has increased to 84.8% compared with 80.9% as reported at the last DUN sitting.
Sarawak Multimedia Authority Rural Telecommunication (SMART)
For the information of the Members of this honourable House, the Sarawak Government has implemented the Sarawak Linking Urban, Rural and Nation (SALURAN) programme as an intervention measure to improve efforts to expand internet coverage, which previously was only carried out by the Federal Government through the Malaysian Communications and Multimedia Commission (MCMC).
To implement this intervention programme, to implement this, let me repeat, to implement this intervention programme, the Sarawak Government has allocated a total of RM2.3 billion so far. One component of the SALURAN programme is the construction of Sarawak Multimedia Authority Rural Telecommunication towers, or SMART towers, in rural areas. So, SMART Programme is one of the components of the SALURAN Programme launched by SEB with a fund of RM2.3 billion injected by the Sarawak Government.
A total of 546 of the 600 SMART telecommunication towers have been completed. Of the towers that have been completed, 400 SMART towers are in operation, providing both 4G and MySRBN services, while the remainder will be fully operational in phases in the fourth quarter of 2025.
Development of the National Digital Connectivity Plan (JENDELA) Initiative
In brief, the development of the National Digital Connectivity Plan (JENDELA) Initiative concerns the JENDELA Plan under the Federal Government, which is operated by MCMC. A total of 876 of 901 telecommunication towers have been completed under JENDELA Phase 1.
Of the 876 towers that have been completed, 481 towers are in operation, or on air. For JENDELA Phase 2, MCMC is considering the use of fit-for-purpose technology such as the STARLINK satellite and Fixed Wireless Access (FWA), based on the population density and terrain of the targeted settlement areas.
Implementation of 5G (2023-2024)
Implementation of 5G (2023-2024): so far, 523 of the total 583 5G sites have been in operation, and the remainder is expected to be in operation in the first quarter of 2025. My ministry calls on the Ministry of Digital Malaysia (KDM) to continue the implementation of the next phase of 5G throughout Sarawak.
MySRBN Internet Plan
The MySRBN Internet Plan, starting from 7 July 2024, my ministry, through the Sarawak Digital Economy Corporation (SDEC), has introduced the MySRBN Prepaid Plan, which aims to improve MySRBN services for the people. Under this plan, MySRBN equipment and installation worth RM1,150 as well as a data quota of 300 Megabytes (MB) per month are provided free of charge to customers as an effort to ease the initial cost burden.
For the prepaid plan, there are two options available, namely the MySRBN 1 Terabyte prepaid plan and the MySRBN Weekly Pass. The MySRBN 1 Terabyte prepaid plan provides 1,000 Gigabytes of data worth RM70, meaning customers pay only RM20 (for a period of 30 days) because the Sarawak Government subsidises RM50 for this plan. That means, the cost totalling to RM70, Mr Speaker, but the consumer needs to pay only RM20 the balance of RM50 is being subsidised by the government through SDEC.
Customers may also choose the MySRBN Weekly Pass priced at RM5, which offers 200 Gigabytes of data for a period of seven days. These prepaid plans are the cheapest compared with other commercial internet plans. This plan is one of the intervention programmes of the Sarawak Government to expand internet coverage, especially in rural areas. So far, the number of MySRBN users has reached 24,000 households throughout Sarawak.
Efforts to expand MySRBN services in Sarawak are still being vigorously carried out. A promotional campaign to encourage the use of MySRBN will be held in Pulau Bruit in January 2025. This campaign will subsequently be expanded throughout Sarawak. So, I hope the Honourable Member for the constituency of Semop, who is also the Deputy Minister in the Premier's office, will be able to join us in January as per our programme later on. Yes, thank you.
Telecommunication Coordination Committee Meeting (TCCM)
Telecommunication Coordination Committee Meeting (TCCM), for the information of this honourable House, since 2022, my ministry has held engagement sessions with telecommunication companies and government agencies through the Telecommunication Coordination Committee Meeting (TCCM). This committee plays a role in monitoring the progress and performance of telecommunication projects from time to time in an effort to improve full coverage throughout Sarawak. A total of 92 of the 106 critical issues raised since 2022 until 2024 have been resolved, such as issues of right of way (wayleave), siting, electricity supply to telecommunication towers, network upgrading, vandalism and so on.
This initiative has enabled many telecommunication projects in Sarawak to be implemented more effectively and efficiently. I would like to place on record my highest appreciation and thanks to all parties who have contributed ideas and effort and shown a high commitment in addressing every issue raised.
Handover of Pan Borneo Fibre Optic
For the information of this honourable House, during the construction of the Pan Borneo Highway Project, temporary fibre optic cables were built to allow telecommunication services to continue until the permanent fibre optic cables were fully implemented. Now, the permanent fibre optic cables have been completed, and the temporary fibre optic cables are proposed to be disposed of.
However, since the temporary fibre optic cables are still usable, the Federal Government, through the Ministry of Public Works Malaysia (KKR), has agreed to hand over these temporary fibre optic cables free of charge to the Sarawak Government through the Ministry of Utilities and Telecommunications. My ministry will then hand over these fibre optic cables to the Sarawak Multimedia Authority (SMA) for management, operation and regulatory purposes. The takeover of these fibre optic cables will bring the following benefits:
(a) Providing new connectivity to areas that previously had no services; and (b) Providing alternative infrastructure for high-speed broadband networks.
Here, I would like to express my highest appreciation and thanks to the Federal Government and the relevant agencies involved in the process of handing over these fibre optic cables.
International Digital Economy Conference Sarawak 2024 (IDECS 2024)
For the information of Members of this honourable House, the International Digital Economy Conference Sarawak 2024 (IDECS 2024), with the theme "AI for Sustainable Development: Navigating the Green and Circular Future", was successfully organised from 16 to 17 October 2024.
IDECS 2024 attracted the participation of 4,494 delegates from 31 countries and involved 101 speakers who shared their expertise in the digital economy. In addition, 13 Memoranda of Understanding (MoU) were signed between local and international companies, strengthening the strategic cooperation of Sarawak's digital ecosystem on the global stage.
Internet Coverage on Highways and Roads
Mr Speaker, for the information of this honourable House, the Federal Government announced the initiative "Di Mana Ada Jalan, Di Situ Ada Internet" (Wherever There Is a Road, There Is Internet) last year. In this regard, I call for this initiative to be expedited, and for MCMC to take into account blind spot locations along the Pan Borneo Highway, Coastal Road (Jalan Pesisir), the Second Trunk Road (Jalan Utama yang Kedua) and other main roads in the planning of JENDELA Phase 2.
Data Centre
In general, a data centre is a physical premises used to store, manage and process large-capacity data. Data centres play an important role as supporting infrastructure for digital services such as cloud computing, SCS Mobile+, SPay Global, WhatsApp, Facebook, Shopee, Tiktok, Netflix, Youtube and others. All these digital services have become part of the facilities that influence our daily lives.
Therefore, Mr Speaker, my ministry has set up a Data Centre Task Force which aims to formulate policies and coordinate the development and implementation of data centres in Sarawak. Sarawak has an advantage in data centre development because it has vast land, sufficient electricity and water supply, and access to submarine cable network systems. In addition, Sarawak is also located outside the Pacific Ring of Fire.
This initiative is in line with the Sarawak Digital Economy Blueprint 2030 to encourage the development of technology parks as well as data centres and thereby enable Sarawak to become a data centre hub in the region.
Spectrum
To ensure more efficient spectrum management in Sarawak, my ministry, through the Sarawak Multimedia Authority (SMA), has set up the Sarawak Spectrum Committee. This committee will play a role in exploring spectrum management methods, policy formulation and industry standards, in line with Federal law to ensure Sarawak's interests in telecommunications development.
Spectrum, which consists of radio frequency bands, is an important asset of our nation. In line with the Amendment to Sections 2, 37 and 213 of the Sarawak Land Code (Chapter 81), Sarawak now has the right to manage spectrum in its territory. This right is important to enable the Sarawak Government to help the Federal Government regulate wireless communication activities by public and private entities more effectively. It is also important for addressing security issues such as spectrum interference that can occur at any time.
This takes into account the physical condition of our country, which has extensive topography and border areas on the Sarawak side. Therefore, Sarawak's role in managing spectrum in its territory effectively must be given high priority by the Federal Government and then be realised. The Sarawak Government intends to hold engagement sessions with the Federal Government through the relevant federal ministries and agencies to obtain spectrum management rights in Sarawak.
As presented at the last DUN sitting, I also hope that spectrum bands that are not fully utilised (underutilised spectrum) in Sarawak will be reallocated to Sarawak. My ministry will submit this requirement to MCMC because we know there are certain underutilised spectrums in Sarawak that should be considered and be reallocated to Sarawak in the nearest future. We will get in touch with the Federal Government through the MCMC.
Space Industry and Satellite Technology
The space industry and satellite technology have great potential in the development of Sarawak's digital economy. Recognising the importance and long-term benefits of this industry, the Honourable Premier of Sarawak has made a proactive decision to explore the space field and make Sarawak a space technology hub in the region.
Therefore, my ministry, with the cooperation of SMA, has set up the Space Industry and Satellite Committee (Space Industry and Satellite Committee (SISCOM)) to prepare the Sarawak Space Industry Development Roadmap for the development of the space and satellite industry in Sarawak. Furthermore, it is most timely that the Federal Government has decided to choose Sarawak as a satellite launch site in Malaysia. As an initial step in this initiative, SMA and MEASAT Global Berhad signed an MoU on 15 October 2024 in conjunction with IDECS 2024. The MoU is expected to provide an early step in formulating policies and guidelines for the space industry in Sarawak. The Sarawak Government is open to collaborating with any other parties who also have expertise in the field of space and satellites in the near future, apart from MEASAT. So, we are open to collaborate with any party who have the expertise and technical knowledge in the nearest future.
CHALLENGES
Vandalism
Now, I would like to touch on the challenge of vandalism. For the information of this honourable House, from January to October 2024, cases of vandalism involving damage to utility infrastructure facilities such as electricity, water and telecommunications have recorded 1,655 cases with an estimated loss of RM5.4 million. This vandalism has affected utility and telecommunication services and inconvenienced the public.
To address this vandalism problem, my ministry has set up the Anti-Vandalism Committee involving utility and telecommunication agencies such as Sarawak Energy, JBALB, Kuching Water Board, Sibu Water Board, LAKU Management, SDEC and PETROS, together with the State Attorney-General's Office (SAG's Office), SMA, MCMC, PDRM, UKPS and the relevant telecommunication service providers. The roles of this committee include:
(a) Examining proposed amendments to laws, if necessary; (b) Enforcement actions; (c) Awareness campaigns; (d) Security of utility assets; and (e) Other initiatives to combat vandalism activities from time to time.
For the information of Members of this honourable House, on 3 July 2024, the Honourable Premier launched the State-level Anti-Vandalism Prevention Campaign at BCCK, Kuching. This was followed by the divisional-level Anti-Vandalism Prevention Campaign in Bintulu on 29 October 2024. The campaign will continue in all divisions in Sarawak to raise public awareness of the crime and effects of vandalism. In addition, four integrated Ops Lusuh operations led by the Royal Malaysia Police (PDRM) were carried out together with utility agencies, MCMC and telecommunication companies throughout Sarawak this year.
Specific Issues
Now, Mr Speaker, I would like to touch on the specific issues raised by Honourable Members during their debate on the Supply Bill (2025), 2024.
Specific Issues (Water Supply)
For the information of the Honourable Member for Daro, the Proposed Kpg. Daro High Level Tank (HLT) and Laying of Gravity Main from Jemoreng to Kuala Matu HLT will be implemented in December 2024 and are expected to be completed in the first quarter of 2025. For the information of the Honourable Member for Kalaka and Beting Maro, the areas raised will receive water supply after completion of the Sarawak Water Supply Grid Program – Stressed Areas Improvement of Water Supply System in Betong Division – Package 1 – Water Supply Works in Kabong District. As of October 2024, the physical progress of this project has reached 99.5%. So, now the project is completed at rate of 99.5%. The testing and commissioning (T&C) process is being actively carried out. This project is expected to be fully completed in the first quarter of 2025. That I believe will assist both areas Kalaka and Beting Maro.
For the area of Kampung Perpat Hulu and several longhouses in Lubok Nibong, namely Rh. Galing, Rh. Raweng and Rh. Mujah, the proposal to connect treated water supply to these areas will be submitted to the Ministry of Rural and Regional Development (KKDW) under the Rural Water Supply (BALB) Late Applicant Project for 2025. Meanwhile, to overcome the issue of low water pressure in the Pusa and Beladin areas, the Sarawak Government has allocated RM9.5 million to replace and upgrade old pipes of various sizes over a length of 25.4 km, which will be implemented in phases beginning in 2025.
The proposal to provide high-level water tanks in the Pusa, Sepinang and Beladin areas has been approved for implementation under the funding of the Sarawak Government through the project Proposed Upgrading Works at Pusa Beladin and Maludam Water Treatment Plant, Betong Division. This project is expected to commence in the third quarter of 2025. For the information of the Honourable Member for Jepak, the areas of Serupai, Annau and Samarakan will receive water supply through the implementation of three Rural Water Supply Projects that have been approved by the Federal Government.
All three projects are currently at the design stage. All matters relating to the appointment of consultants, value management studies, tender invitations, tender evaluation and contract award are being handled by the Federal Government through KKDW.
For the information of the Honourable Member for Tebedu, to resolve the water supply issue along Jalan Baki Riih including Kampung Bunga, the Rural Water Supply Department (JBALB) is carrying out interconnection works from the main pipe of Jalan Kuching-Serian to improve water capacity to the Taee Booster Pump Station, which is expected to be completed by the end of November.
The tender for the replacement of the old pipe over a length of 6.7 km at Jalan Baki-Riih was invited on 9 November 2024, and this project is expected to be completed in the third quarter of 2025. The Sarawak Government has also approved the Proposed Upgrading Serian – Kuching Pipeline, Serian Division project, which is expected to commence in the second quarter of 2025.
For the information of the Honourable Member for Machan, based on my site visit last October, the progress of the Water Supply Project from the Salim Water Treatment Plant to Kanowit has reached 91.1% and is expected to be completed in the first quarter of 2025. The Honourable Member is invited to join my site visit and that of colleagues from the relevant ministries and agencies so that together we can witness the progress of the project when we hold the site visit later.
For the information of the Honourable Members for Lingga and Engkilili, to meet the water supply demand in the areas raised, the Sarawak Government has approved the implementation of two Water Supply Projects, namely the Proposed Engkilili Regional Water Treatment Plant, Sri Aman Division and the Proposed Sri Aman Regional Water Supply System, Sri Aman Division, under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMK-12). These projects are expected to commence in the second and fourth quarters of 2025 respectively. So, both of these projects are projects financed by the Sarawak Government itself.
With the implementation of these projects, a continuous source of treated water supply will be channelled from the new Engkilili Water Treatment Plant with a capacity of 75 million litres of water per day (JLH) through the main grid pipeline to the whole of Sri Aman Division from Engkilili, Skrang, Lubok Antu, Simanggang, Pantu to Lingga, in line with the Sarawak Water Supply and Water Grid Master Plan. While awaiting the completion of the project, an Acute Water Treatment Plant will be built to improve the existing water supply in Lingga District. So, we are putting up the Acute Water System in Lingga District shortly.
As for the water pressure issue in the Sedarat and Memaloi areas caused by the leakage of the Engkilili high-level water tank, repair works have already been completed. For the areas of Ulu Skrang and Tisak, the Rural Water Supply (BALB) Project for Ulu Layar, Ulu Padeh and Ulu Skrang Areas, Betong Division, Sarawak, has been submitted under the Fifth Rolling Plan (RP5) of the Twelfth Malaysia Plan (RMK-12) for 2025 to the Ministry of Rural and Regional Development (KKDW) and is awaiting approval.
For the information of the Honourable Member for Opar, the Proposed New Lundu Water Treatment Plant and Proposed Lundu-Sematan Regional Water Supply projects funded by the Sarawak Government are currently at the tender document preparation stage, while the physical works will commence in the second quarter of 2025 and are expected to be completed in the fourth quarter of 2027. Meanwhile, the tender for the Rural Water Supply (BALB) Project in part of Lundu District, Kuching Division, Sarawak, funded by KKDW, will be invited at the end of this year. All tender invitations for KKDW projects, tender evaluation and contract award are being handled by KKDW itself.
For the information of the Honourable Member for Telang Usan, a total of 80 villages comprising 3,410 doors will receive clean water supply through the implementation of the Sarawak Alternative Water Supply (SAWAS) programme under the funding of the Sarawak Government and KKDW, which is currently at the consultant appointment stage.
For the information of the Honourable Member for Simunjan, the construction of a high-level water tank in the Simunjan area is one of the scopes under the Proposed Serian Regional Water Supply Phase III project funded by the Sarawak Government, which is currently at the tender document preparation stage. The tender is expected to be invited in the first quarter of 2025 and construction works will commence in the second quarter of 2025.
For the information of the Honourable Member for Tellian, the following is the status of the projects that have been raised:
(a) Two (2) projects have been approved under the Mid-Term Review of the Twelfth Malaysia Plan (KSP RMK-12) fully funded by the Sarawak Government, namely the Proposed Mukah Water Treatment Plant, Mukah Division; and
(b) Proposed Mukah Water Supply System, Mukah Division. Both of these projects are currently at the design stage and the tender is expected to be invited in the third quarter of 2025.
So, don't worry about the project, both projects have been approved, it is just a matter of implementation. Meanwhile, three projects will be implemented under the funding of the Ministry of Rural and Regional Development (KKDW) as follows:
(a) Treated water supply in the Sebakong to Nanga Sikat area is currently at the consultant appointment stage;
(b) Treated water supply in the Bukit Engkerbai to Lubok Bemban area is currently at the tender document preparation stage; and
(c) Treated water supply in the Sg. Arip area, Sibu Division and Ulu Baoh, Sebakong, Mukah Division is currently at the design stage and the tender is expected to be invited in the fourth quarter of 2025.
Two longhouses, namely Rh. Meriak and Rh. Banyai, have been proposed under the implementation of SAWAS Phase 3 funded by the Sarawak Government. This project is currently at the consultant appointment stage. The implementation of this project will provide clean water benefits to 33 doors in the Tellian area.
In addition, a total of five longhouses comprising 88 doors have been approved under the Twelfth Malaysia Plan (RMK-12) Rolling Plan 4 (RP4) for 2024 for the implementation of alternative water supply. Meanwhile, a total of nine longhouses comprising 129 doors have been submitted to KKDW under the RMK-12 Rolling Plan 5 (RP5) for 2025 for consideration. SAWAS in Kampung Klid, Rumah Iman, Rumah Langit, Rumah Michael Chabo, Rumah Lawai and Rumah Buan is currently in operation and has benefited 159 households.
For the information of the Honourable Member for Krian, water supply to the areas of Ulu Sebetan, Brayang, Mudong and Kop Ibus will be provided through the Proposed Water Supply System to Saratok District, Betong Division project funded by the Sarawak Government under KSP RMK-12. Meanwhile, water supply to the Ulu Grenjang area will be provided through the Project to Build a Rural Water Supply (BALB) System in the Ulu Grenjang Area, Saratok, Betong Division, which has been approved under the funding of the Ministry of Rural and Regional Development (KKDW).
For the information of the Honourable Member for Ngemah, the water supply in the areas raised has been included in the Proposed Kanowit Regional Water Supply, Sibu Division project funded by the Sarawak Government and is currently at the design stage.
For the information of the Honourable Member for Batu Danau, longhouses around Simpang Sagan / Ulu Lubai, including the health clinic and school that do not have road access, will receive water supply through the SAWAS Phase 3 Programme funded by the Sarawak Government. Meanwhile, for Simpang Jalan Semena / Kuala Medalam, which covers five longhouses, namely Pa Sebiling, Rh. Helen, Rh. Satu, Rh. Juing and Rh. Diras Long Serangan, including SK Kuala Medalam and the Kuala Medalam Health Clinic, will receive water supply through the project Proposed Construction of New Road and Extension of Water Supply Pipelines from Nanga Medamit to Rumah Aling, Limbang District. Construction of the project is expected to commence in the first quarter of 2025 and will be carried out by RECODA.
For the information of the Honourable Member for Kabong, the Water Supply Project to the Ulu Roban area approved under Federal allocation through KKDW is currently at the detailed design stage and the tender is expected to be invited in the first quarter of 2025. To improve the existing water supply system in Kabong District and its surroundings, an acute water treatment plant will be built in Lichok and construction is expected to commence in January 2025.
For the information of this honourable House, to expedite the implementation of the Rural Water Supply (BALB) Projects, including the project raised by the Honourable Member for Tamin, I have proposed that the allocation of the Federal Government's Rural Water Supply Projects be channelled directly to the Sarawak Government, adopting the financial procedures of the Sarawak Government. Thank you to the Honourable Member for Tamin for proposing the same matter. Thank you very much Member for Tamin.
Electricity Supply Issues
For the information of the Honourable Member for Pending, consumers who have smart meter billing problems, as raised by the Honourable Member for Pending, are advised to bring the matters directly to Sarawak Energy Berhad at the Customer Care Centre at 1300-88-3111 (statewide number) for immediate solutions. Otherwise, you can assist and bring the matter directly to the Customer Care Centre at Sarawak Energy. For the information of the Honourable Member for Pending, businesses operating at premises with electricity supplied through SEB's application process under the relevant tariff category and whose electricity bills have been duly paid are not in breach of the Electricity Ordinance.
For the information of the Honourable Members for Kalaka and Kabong, I deeply sympathise with the problems faced by the communities in the Kalaka and Kabong areas. My ministry, through Sarawak Energy, has implemented several projects as follows: (a) The 33 kV line from Selalang to Plassu as a second source for the 33 kV line to Kabong and Roban was completed in September 2024 at a cost of RM1.3 million;
(b) Installation of a new 33/11 kV 5 MVA transformer at Plassu is expected to be completed in the first quarter of 2025 at a cost of RM1.17 million;
(c) Conversion of the 33 kV overhead line to underground cable at Jambatan Nyabor is expected to be completed in the first quarter of 2025 at a cost of RM249,000; and
(d) Installation of a 33 kV line along Jalan Krian from the Kampung Kaba junction to Nyabor under the Betong Division Development Agency (BDDA) project at a cost of RM11.3 million and is expected to be completed in the second quarter of 2026.
The implementation of all these projects will improve the quality of electricity supply in the Kalaka and Kabong areas. In addition, two projects in the planning stage are as follows:
(a) Construction of a 33 kV monopole line from the Extra High Voltage (EHV) Serudit substation to the 33/11 kV Saratok substation; and
(b) Construction of a 33 kV substation at Simpang Roban.
For the information of the Honourable Member for Pelagus, the surrounding villages in Pelagus are currently supplied through three solar hybrid stations and 57 SARES stations. To connect this area to the grid for a reliable electricity supply, a project, Construction of Main Distribution Substation and 33 kV Nanga Merit Overhead Line, has been approved under the Twelfth Malaysia Plan (12MP) by the Federal Government at an amount of RM108 million, which is now at the pre-construction stage.
For the information of the Honourable Member for Bukit Begunan, the 33kV overhead line construction project from Sri Aman to Lingga and Banting, including the main substations valued at RM123 million, has been approved for implementation under the Federal Government's allocation. The project is currently in the pre-implementation phase and is expected to commence physically during the Thirteenth Malaysia Plan (13MP). Once completed, this project will connect the Banting area to the grid.
For the information of the Honourable Members for Balingian, Tellian, Krian, Meluan, Engkilili, Batu Danau and Ngemah, as I have informed earlier, my ministry together with the implementing agency, Sarawak Energy Berhad (SEB), has received a total of 21,073 applications throughout Sarawak, of which 18,568 have been completed and the balance is at various stages of implementation. The implementation of the ALAF project for new applicants is estimated at 30,600 households throughout Sarawak and is expected to be implemented in phases 5, 6 and 7 under RMK-13. So, hopefully my colleagues statewide would be patient enough to wait because the number is quite big and we have to follow the queue system, so we always inform my colleague that nobody shall overtake the queue as the waiting list is quite long.
For the information of the Honourable Member for Murum, several technical programmes and courses have been implemented and specifically planned for the residents of Murum. For the information of the Honourable Member for Kabong, the issue raised will be acted upon by Sarawak Energy on a case-by-case basis.
Specific Issues (Gas)
Now I turn to the specific issues raised regarding gas. For the information of the Honourable Member for Pending, there is no time limit for exchanging yellow LPG cylinders for PETROS red LPG cylinders. I think I have mentioned it just now. We are as concerned as the Honourable Member for Pending about isolated cases faced by consumers in LPG exchange. For any enquiries related to LPG cylinder exchange or supply, customers can contact PETROSNiaga through the PETROS LPG number at 1-300-882-122.
For the information of the Honourable Member for Tanjong Batu, as I informed earlier, PETROS has provided an allocation of RM100 million to implement the natural gas pipeline network project in Bintulu. This project will be implemented in the second quarter of 2025.
Mr Speaker, I would like to refer to the remarks made by the Honourable Member for Stakan who said that PETRONAS should follow our state laws and is not above the law. The Honourable Member's comments echo the frustrations of Sarawakians over PETRONAS's management of our natural gas resources. These frustrations stem from its failure to provide sufficient gas to support Sarawak's industrial growth and attract potential investors. Let me make this clear, calling for PETRONAS to respect Sarawak's laws is neither a threat nor an act of blackmail—it is a legitimate demand grounded in legal rights.
Sarawak accounts for over 60% of the natural gas produced in Malaysia. But of this volume, 94% is used by PETRONAS to convert into Liquefied Natural Gas (LNG) for export to Korea and Japan to support industries in these two countries. However, all the gas produced offshore Peninsular Malaysia is retained for use in the States of Peninsular Malaysia, to support industries and sold for power generation by independent power producers at subsidised rates.
In stark contrast Mr Speaker, only 6% of Sarawak's natural gas is allocated for local industries and power generation, with prices dictated by PETRONAS. Foreign investors who wish to set up industries in Sarawak were repeatedly told that there is no gas available for them. Consequently, these investors chose other destinations for their investments, depriving Sarawak of crucial economic opportunities. PETRONAS' small gas allocation for use in Sarawak does not support industrial development in Sarawak.
To address this imbalance, Mr Speaker, and to ensure adequate supply of gas for local industries and for the state's energy transition programme, the State Government has developed a Sarawak Gas Road Map and appointed PETROS as sole gas aggregator to produce, allocate and distribute gas to ensure that there would be adequate supply of gas for use by industries in Sarawak.
At the request of the Sarawak Government, PETRONAS has signed a Memorandum of Understanding with PETROS to use its best endeavour to allocate 1.2 billion standard cubic feet per day (Bcf/d) by 2030 to support the Sarawak Gas Road Map. However, until today PETRONAS has yet to identify where the allocated volume of gas would be sourced and when the gas fields would be developed.
Sarawak calls for the development of more gas fields to produce more gas to support the Sarawak Road Map and to boost industrial development. In this respect, more gas distribution networks, infrastructure and pipelines need to be built or installed. Since the 1980s, PETRONAS had not invested in gas distribution infrastructure except to supply LNG plants to produce LNG for export. Hence, PETROS had to build a pipeline from Bintulu to deliver gas to Samalaju for both power generation and to support the heavy industries in Samalaju.
I noted a call by a former Minister for Law, I think the name is here Datuk Zaid Ibrahim, for cool heads to resolve oil and gas issues involving PETRONAS. The Sarawak Government has always called for collaboration between PETROS and PETRONAS. I hope he knows about it. However, recent conduct and actions by PETRONAS do not demonstrate that PETRONAS intends to have an amicable solution. Regrettably, PETRONAS does not seem to respect and abide by our laws such as the Distribution of Gas Ordinance, 2016, or to cooperate with PETROS to enable PETROS to carry out its statutory functions in the interests of Sarawakians. Compliance with these legal frameworks is not optional—it is a statutory duty that must be honoured by all parties. So, I hope that being a lawyer, the person by the name of Datuk Zaid Ibrahim is cool enough to understand our state law and please don't be a one-sided individual opinion.
Those with cool heads, I repeat Mr Speaker, those with cool heads will realise that since the coming into force of the Petroleum Development Act, 1974, the cumulative value of petroleum produced and obtained in Sarawak, by PETRONAS and the Federal Government up to 2014 is RM1,000 billion or equivalent to RM1 trillion, with only 5% or RM50 billion thereof returned to Sarawak in the form of cash payment pursuant to Section 4 of the PDA. With such enormous contribution to the national coffers, Sarawak deserves better attention, treatment and support from PETRONAS. The least that PETRONAS should do is to comply with our laws when operating in Sarawak and allocate and make available more gas to support the industrial development of Sarawak and its transition towards a green economy.
Sarawak's journey to reclaim its rightful autonomy over its resources is both a matter of principle and necessity. It is a testament to our responsibility to secure a prosperous and sustainable future for Sarawak and for future generations who are also Malaysians in this part of Malaysian territory. So, I think everybody should understand our state law.
Specific Issues (Telecommunications)
For the information of the Honourable Members for Balingian, Kalaka, Pelagus, Tebedu, Jepak, Simunjan, Stakan, Tamin, Ngemah, Beting Maro and Kabong, to improve internet speeds, the Malaysian Communications and Multimedia Commission (MCMC) from time to time conducts network audit activities to ensure that service providers comply with the quality standards that have been set. In addition, my ministry has worked with MCMC to plan the construction of new transmitter structures under the JENDELA Phase 2 initiative to expand and improve telecommunications services in Sarawak.
For the information of the Honourable Member for Balingian, regarding the issue of telecommunications cables raised, MCMC has held a coordination meeting with the relevant telecommunications companies. The telecommunications companies will carry out continuous survey and maintenance works that have been carried out since October this year.
Closing
Before concluding my speech, I would first like to extend my warmest congratulations and appreciation to Mr Speaker, the Deputy Speaker, the Secretary and all officers of this honourable House for conducting the sittings of this honourable House on this occasion so very well and smoothly. Thank you also to the State Secretary of Sarawak, the Federal Secretary, the Attorney General of Sarawak, the State Financial Secretary, all Permanent Secretaries of ministries, heads of departments, the stenographers and all parties who have given their cooperation to make the sitting on this occasion a success.
I would also like to record my appreciation and thanks to both Deputy Ministers in my ministry, the Permanent Secretary and Deputy Permanent Secretary, and all officers in my ministry and all officers of the agencies under the purview of the Ministry of Utilities and Telecommunications for their high commitment during the sitting of the Sarawak State Legislative Assembly on this occasion.
On this occasion, I would also like to extend Christmas greetings to my Christian friends and to my other friends, and a happy welcome to the coming New Year 2025. I pray to Allah S.W.T. that He will always bestow His blessings upon us all and protect Sarawak, my beloved homeland. Greetings of a Prosperous and Developed Sarawak, and greetings of Unity and Harmony. However, Mr Speaker, before I sit down I would like to share several pantun with my friends in this honourable House.
Speak by day, look about you, Speak by night, be careful, Sarawak has its own laws, Must be read, must be respected.
Manchester City keeps on fighting, Liverpool is now at the top, Sarawak's rights must be fought for, Sarawak's gas must not be seized.
Diligent in studying, going to class, Hoping to obtain a first-class degree, Do not consider us to be lazy, High income comes from hard work.
Water treatment plants continue to be built, Electricity supply continues to be pursued, Let us all come together, To build a nation strong and mighty.
Terubuk fish from Sebuyau, Empurau fish from Belaga, To be served at Pantai Damai, Our Sarawak land is much cherished.
We in Sarawak have our worth, Come, let us gather together; Selasih leaves, mengkudu leaves; Thank you, thank you.
With that, Mr Speaker, I support the Supply Bill (2025), 2024, which was tabled by the Honourable Premier of Sarawak. Thank you.
Ahli-ahli Yang Berhormat, we have a break. Sitting resumes at 2.30 p.m.
(Sitting suspended at 1.17 p.m.)
(Sitting resumed at 2.35 p.m.)
[Deputy Speaker in the Chair]
With all due respect, I invite the Honourable Dato Sri John Sikie anak Tayai, Minister in the Premier's Department, to deliver the winding-up speech. Please proceed.
Mr Speaker, thank you. Honourable Members of this august House, first of all I would like to take this opportunity to congratulate and thank the YAB Premier of Sarawak for presenting a budget that is among the largest in Sarawak's history to date. This is a comprehensive budget that places emphasis on development, especially in rural areas, towards an advanced society in line with the PCDS 2030 agenda, namely economic prosperity, social inclusiveness and environmental sustainability.
I also wish to record my highest congratulations to His Excellency the Yang di-Pertua Negeri of Sarawak, Tun Pehin Sri Dr. Haji Wan Junaidi bin Tuanku Jaafar, who was appointed as the 4th Chancellor of Universiti Malaysia Sarawak (UNIMAS) on 16 October 2024. My highest congratulations also go to the Yang Amat Berhormat Datuk Patinggi Tan Sri (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Premier of Sarawak, who was conferred the Order of Setia Negara Brunei, Yang Amat Bahagia, First Class (P.S.N.B.), carrying the title "Dato Seri Setia", in conjunction with the celebration of the 78th Birthday of the Sultan of Brunei Darussalam on 15 July 2024 last, and also the Highest State Honour of Sabah, namely Datuk Seri Panglima Darjah Kinabalu (S.P.D.K.), carrying the title "Datuk Seri Panglima", in conjunction with the 71st Official Birthday Celebration of the Yang di-Pertua Negeri of Sabah on 5 October 2024 last. I also take this opportunity to extend my highest congratulations to fellow Honourable Members who were conferred the Sarawak State Orders and Medals in conjunction with the celebration of the 78th Birthday of His Excellency the Yang di-Pertua Negeri of Sarawak on 12 October 2024 last.
Mr Speaker, thank you very much Yang Berhormat Datuk Speaker for giving me the opportunity to deliver my winding up speech this afternoon. I will speak on matters relating to my portfolio, namely, Majlis Adat Istiadat Sarawak, Mahkamah Bumiputera Sarawak, and some Units under Premier's Department. These Units are the Unit Pentadbiran; Unit Pengurusan Imigresen dan Buruh; and Unit Integriti dan Ombudsman.
Sarawak Customs and Protocol Council
Tuan Speaker, first, I will begin with matters relating to the Majlis Adat Istiadat Sarawak. The Majlis Adat Istiadat Sarawak was established as a Unit in, then Jabatan Ketua Menteri, now Jabatan Premier Sarawak in October 1974. Last October marked the 50th anniversary of the establishment of the Majlis. In this connection, I would like to mention some of the thoughts and approach adopted by the Majlis in its research and teaching of Adat. The purpose is to make Adat a relevant and significant again in tandem with the changing social, economic and political circumstances in the native communities. The new thoughts and approach would also equip the Majlis in its advisory function and codification of Adat. And in this regard, I will highlight some of the activities organised by the Majlis during the year.
MAIS 50th Anniversary of its Establishment
The Majlis was initially established for the preservation, development, and dissemination of Adat of the natives of Sarawak. The aim was, and still is, to promote a better understanding and appreciation of Adat and the history of the native communities. However, the passing of Majlis Adat Istiadat Ordinance, 1977, marked a very important historical event and authority for the Majlis. The 1977 Ordinance entrenched the Majlis as an advisory body to Tuan Yang Terutama Yang di-Pertua Negeri Sarawak and the Majlis Mesyuarat Kerajaan Negeri Sarawak on all matters relating to the Adat of the natives of Sarawak.
The term “Adat” can mean native laws or legal rules and native social rules. At the moment, the Majlis is focusing its effort on the Adat which are native laws or legal rules. These Adat are enforceable in the court of law. The Adat, among other things, provides and protect personal rights, rights to property and natural resources, inheritance, family matters, cultures, identity, traditions, heritage, and justice to members of the native communities. Some of the rights and protections are peculiar to the natives which may not be sufficiently regulated by the State law. For example, the consecration of cemetery is a very serious crime to most native communities. But such an offence may only be prosecuted as a minor offence which carries a very minimal fine.
The Adat which are social rules are related to cultures, traditions, ethics, etiquette, values, decorum, and procedures, to name but a few. These Adat are not enforceable in the court of law. Nevertheless, they are still very important as a guiding principle for good behaviour, proper up-bringing and proper morality. Any person who breached such Adat may be treated as a recalcitrant, or poor up-bringing, or immoral and frown upon by members of the community. At the moment, the learning and teaching of these Adat are left to the individual family to articulate and practice.
Tuan Speaker, the preservation, development, and dissemination of Adat which are native law remains a core function of the Majlis. This function is very important to assist the Sarawak Government in the governance of the native communities at the micro level in their traditional settings. It would also provide support and development to the Native Judicial System at the micro level, Native Courts of Sarawak, and the judiciary, in general.
The Adat are used as a political tool for the administration and regulation of social relations and general affairs of the communities. The ultimate aim is to create an “Ideal Society”, that is, a society where peace, harmony, unity, fairness, justice, and longevity prevail for a reasonable period of time. Such situation could provide the opportunities for the people to find happiness and prosperity.
Obsolete Adat
Most of the current Adat are ancient in origin and derived from many sources. Some of the Adat are presumed to have derived from Divine law and Spiritual sanction, which are expressed in term of spiritual prohibition, restriction, proclamation and mandate. Some are believed to derive from customs, cultures, and tradition. While some of the Adat are deemed to be derived from command of past leaders. This recent Adat are made through deliberation through meeting of members of the longhouses or villages and the Jawatankuasa Keselamatan dan Kemajuan Kampung or (JKKK). The knowledge, the understanding practice of the old Adat are based on the social, economic and political circumstances during the time they were formulated centuries ago. In some cases, the Adat are intertwined with culture, tradition, and spirituality.
However, widespread literacy among the natives, expose to other social environments, rural urban migration, economic migration and conversion to new religion, to name but a few, have brought about new ideas and knowledge to many members of the younger generation.
These phenomena have, to a certain extent, changed their views and acceptance of Adat. The flux of socio-economic and political changes during the last 60 over years, that is the period since Sarawak Independence, further aggravated the decline in the relevance and significance of Adat. For example, most of the Adat which are believed to derive from Divine law, spiritual sanctions, spiritual proclamation and spiritual mandate are abandoned or diminished in relevance.
Furthermore, the traditional socio-cultural concept and understanding of Adat is not compatible with the principle of jurisprudence or legal sociological theory as practised by the Native Courts of Sarawak and the judiciary, in general. Thus, there is a serious clash between ancient Traditions and Modernity which need to be resolved if Adat are still required as tool for the governance of the native communities.
New thoughts and Approaches by the Majlis
Tuan Speaker, in view of the decline in the relevance of Adat, the Majlis has embarked on new thoughts and approach in its research and teaching of Adat. This is to adjust and adapt Adat in tandem with the changing social situation and to make Adat relevant and alive again. The new approach is to review the old traditional understanding and interpretation of Adat and then to be reinterpret and write the Adat in similar manner with the Malaysian and English principle of jurisprudence and legal sociological theory. In as far as possible, the Adat would be written in legal format and language.
For example, the Adat Iban of Chelap Dapur is a spiritual sanction which requires that the cooking place must be used for cooking at least once a month. Failure to do so would be an offence and may be fined and also to perform a spiritual ritual. It is believed that such an offence could bring bad fortune to members of the longhouse. This Adat would be reinterpreted as an obligation imposed upon the owner of a bilik. It would be rewritten in this manner: “Whoever owns a bilik in a longhouse and stays away from the longhouse shall return at least once in every six months to the longhouse and shall ensure proper maintenance of his bilik. Failure to do so shall be punished by a fine not exceeding RM500”.
Revival of Old Adat
There are some old Adat which have been forgotten or dormant for decades. But certain recreational activities and social circumstances demand the revival and urgent enforcement of the Adat. For example, the Adat which requires prior permission to enter, or to pass through, or to organise recreational activities on land or properties belonging to a kampong or an individual person. Any failure to do so would be an act of trespassing. This is quite common in connection with recreational activities in some places in the Bidayuh areas. I would mention the Adat in more details when I highlight the activities organized by the Majlis.
A Pioneering and a Herculean Task
The reinterpretation and writing of Adat according to the principle of jurisprudence and legal sociology is a pioneering work and a herculean task for the Majlis. It is not only challenging but very difficult to perform. The socio-cultural concept and principle of jurisprudence and legal sociology are worlds apart. To complete the task successfully and satisfactorily, it would require a lot of intensive training and competency building for the research staff. In this respect, the Majlis would collaborate with local and foreign institutions of higher learning to train its staff and to conduct research in Adat and other matters related thereto. Some foreign universities and institutions have been identified to have a large collection of reference materials and works in Adat and would be an ideal place for training research collaboration. Hopefully, some drafts and recommendations can be completed towards the end of next year and presented to the Ketua Masyarakat and Ketua Kaum for their consent. Once the consent is obtained, it would then be presented to Majlis Mesyuarat Kerajaan Negeri for approval.
Tuan Speaker, now I would like to highlight some of the programmes and activities organised by Majlis Adat Istiadat Sarawak relating to the preservation, promotion, and dissemination of Adat.
MAIS Engagement with Stakeholders
In conjunction with MAIS 50th anniversary, the Majlis has successfully organised an engagement with its stakeholders on October 10th, 2024. The program was attended by 250 participants, including representatives from government departments, statutory bodies, IPTA, IPTS, associations and relevant organizations. The purpose was to promote and disseminate the roles and functions of the Majlis and to strengthen co-operation and relationships with government departments, agencies, non-governmental organizations (NGOs), and the public.
Preservation of Adat
To-date, the Majlis has conducted 48 workshops and fieldworks for data collection. The programs were conducted in the Bidayuh, Iban, Melanau and Orang Ulu communities. The research focused on the Adat regulating settlement, family and land matters.
Iban Research Section
As part of the review process of Adat Iban 1993, the Iban Research Section has started the verification of data of Adat Berumah (settlement law) and Adat Ruang Bilik (family law). Towards this end, 20 engagement sessions were organised this year with Iban community leaders. The engagements covered the central and southern regions of Sarawak. The northern region was covered in 2023.
One of the key findings during the verification exercise is that, it is a necessity to incorporate some Adat which were not written in Adat Iban 1993. For example, the Adat on belelang, bejalai and pechah rumah. The rural-urban and economic migrations among the Iban communities are entangling with issues relating to the rights to properties in the ancestral longhouse or village. In this respect, most of the Ketua Masyarakat and Ketua Kaum were in favour of fixing a period for belelang and bejalai. Belelang and bejalai cannot be indefinite. After the lapse of the period fixed, an individual who belelang or bejalai (economic migration or adventure) and who has lost contact with the community would be deemed pindah and automatically lose his rights to property in his ancestral home. With regards to pechah rumah, the rights to temuda, rimba, pulau galau and pemakai menoa are yet to be determined and agreed upon by the Ketua Masyarakat and Ketua Kaum.
Bidayuh Research Section
The Bidayuh Research Section is currently reviewing Adat Bidayuh 1994 and focusing on land matters. In this respect, a total of 14 engagements were conducted since February 2024. From some of these engagements, the section received a request for some dormant Adat to be revived and enforced urgently. For example, the Adat Ngiruga Tarun, that is the Adat on trespassing for the protection of customary land (tana’ binua), farmlands, ancestral burial grounds, and sacred sites. The Adat requires that any outsider or stranger must obtain prior permission to enter the customary land, ancestral burial grounds, and sacred sites, to name but a few, from the Ketua Kampung. If the land is a private land, the outsider or stranger must seek permission from the landowner to enter or to organise any activity on the land. Failure to do so would be trespassing and could render the trespasser to be charged and fined. The reason is that the Ketua Kampung or landowner must be informed of presence or activity of any outsider or stranger on the property. This is a matter of courtesy and respect to the people of the kampung or the individual landowner. The Adat is also a protection against any loss or damage to the property. There have been some recreational activities where outsiders or strangers trespassed over customary land, ancestral burial grounds, farmlands, and sacred sites in some the Bidayuh areas.
Orang Ulu Research Section
In line with the preservation, promotion, and dissemination of Adat, the Orang Ulu Research Section has conducted seven engagement programmes in 2024. The programmes focused on the review of Adat to adjust and adapt the Adat to the changing social circumstances of the Orang Ulu communities.
The Adat review programmes for 2024 focused on Adet Kayan/Kenyah 1994, Adat Bisaya 2004 and Adet Kelabit 2008. The Adet Kayan and Adet Kenyah will be recodified separately. In this regard, two preliminary engagement sessions each (February and July) have been conducted in Miri for data collection with the representative communities. With regards to the Adet Kelabit, the preliminary engagement session for data collection was conducted on 3rd October in Miri. For Adat Bisaya, a verification of collected data session was held in Limbang in September.
The draft for Adat Bagatan had been submitted to Sarawak Attorney General Chambers (SAGC) for vetting. Further to this, the Majlis and Sarawak Attorney General Chambers had conducted a consultative engagement with the Bagatan community in Bintulu last October. It is hoped that the Adat Bagatan would be codified and published soon.
Melanau Research Section
At the moment, Melanau Research Section is focusing its effort to preserve Adat Melanau pertaining to matters on settlement. In that regard, four workshops had been conducted with the Melanau community leaders and Adat practitioners from Mukah, Dalat, Sibu and Miri.
Promotion and Dissemination of Adat
Tuan Speaker, in effort to promote Adat, the Majlis had conducted briefings to Sarakup Indu Dayak Sarawa, Jabatan Wanita dan Keluarga Sarawak, Jabatan Muzium Sarawak and SABATI, on various matters pertaining to Adat. The Majlis had also conducted dialogues and engagements with the associations and representatives from the Iban and Bidayuh communities outside Sarawak this year.
The Bidayuh Research Section had conducted a briefing and dialogue sessions on Adat Bidayuh with members of the Dayak Bidayuh National Association (DBNA) in the Klang Valley. Among others, the issues relating to the rights of inheritance of property and settlement in their ancestral kampung were discussed.
For the Iban section, a dialogue was conducted with the Persatuan Anak Sarawak and other Iban Associations in Johor Bahru. The purpose was to gather their views on the Adat belelang, bejalai, and pindah. One of the key issues raised was rights to native customary land and pulau galau; and pemakai menoa in Sarawak. It is anticipated that this could become a serious issue in the future for the Iban diaspora. The flux of economic migration among the Iban from their longhouses to other towns and cities in Malaysia would be a catalyst for the issue.
Effective Execution of Legal and Statutory Functions Course
On the continuing annual programmes for the Majlis is assisting the Sarawak Civil Service in training the administrative officers from the Resident and District Offices in Adat. The training is conducted through the Effective Execution of Legal and Statutory Functions course organised by the Leadership Institute of Sarawak Civil Service.
Native Marriage Electronic System version 2 (NAMESv2)
The Majlis is the custodian of the Native Marriage Electronic System version 2 (NAMESv2), which is an administrative Registration of Marriage under Adat. In 2024, three workshops were conducted involving 45 district offices and 22 sub-district offices throughout Sarawak. The total of 196 system users attended the workshops. The workshops covered NAMESv2 historical narrative, objective of registration, and record management.
Native Courts of Sarawak
Tuan Speaker, I would now like to update Members of this august House on the affairs of the Native Courts of Sarawak. The Native Courts of Sarawak came into being with the passing of the Native Courts Ordinance in November 1992. The Office of the Chief Registrar which oversees and supervises all the Native Courts under the residents and districts became operational on the 1st June 1993. As a Unit under the Premier’s Department, the Native Courts and the Office of the Chief Registrar have been and are still an integral part of the Sarawak Administration under the supervision of the Sarawak Secretary.
Masterplan on Transformation of the Native Courts
Tuan Speaker, our Native Court system as I have highlighted in previous sittings of this Dewan, is a legacy and heritage of Sarawak which we must maintain and continue to develop to meet the needs and requirement of time. Our stakeholders particularly the Sarawak native community expects and demand that the courts keep abreast with the current development and challenges. Thus, it is against this background that the Majlis Mesyuarat Kerajaan Negeri had considered and approved a masterplan on the transformation of our Native Courts in July 2023. The ultimate objective of the transformation agenda is to restructure the current native courts and eventually elevate its status to become an independent and full-fledged judicial institution like the Civil and Syariah Courts.
The transformation of the Native Courts will result in changes to the structure or hierarchy as well as the organisational structure of the Native Courts and its modus operandi as a judicial institution. Consequent to the changes in its hierarchy, the Native Courts will adopt new rules and procedures for its operations. Under the proposed restructuring of the Native Courts, the hierarchy of our Native Courts will comprise of two layers which is the Native Subordinate Court and the Native High Court. Under the Native Subordinate Court there will be the Native Magistrate Court as a court of the first instance while the Native High Court will involve three-layers namely the Native High Court, the Native Court of Appeal and the Native Supreme Court as the apex court. This means to say that there will be a new and higher court structure as the apex court under the proposed restructuring exercise.
The transformation of the Native Courts would be implemented in three stages over several years. For the initial phase, the basic requirement for the restructuring is the proposed enactment of the new State laws and amendment to existing laws. For the elevation of its status however, the amendment to several Federal laws under Parliament would be necessary and these would be initiated under Phase 2 and 3 of the transformation program.
Our focus for the restructuring now is on the introduction or amendments of State laws which are State matters. The proposed new State laws which are required for the restructuring exercise are:
(a) The New Native Courts Bill to replace the current Native Courts Ordinance 1992 and the New Native Courts Rules to replace the current Native Courts Rules 1993; and
(b) New Native Courts Judges Appointment Council and Native Courts Judges Remuneration Bill on the appointment and scheme of service for Native Court Judges.
At this juncture, I wish to report that the draft Bills of these two State Laws is with the State Attorney General chamber. In the meantime, and until the new Native Courts Bill is passed by this Dewan the Native Courts Sarawak will continue to operate as it is today based on the Native Courts Ordinance 1992 and Native Courts Rules 1993.
Performance by the Native Courts in Settling Cases
Tuan Speaker, allow me now to also touch on the performance and operations of the Native Courts in the settlement of cases up to October 2024. Since 1992, the total cumulative cases registered at all levels of the Native Courts throughout the State stands at 19,225 cases. Out of that number, 12,878 cases or 69% had been settled and the balance of 6,347 or 31% are still outstanding. Of the number which has yet to be settled, 155 are cases which involved on land compensation amounting to RM6.916 million. As in the case of the last few years, the settlement of most of the cases at the Resident and District Native Courts were mainly presided by the circuit Magistrates.
Application to be Deemed Native for the Purpose of Section 9 of the Land Code
One of the jurisdictions of the Native Courts under the Native Courts Ordinance 1992 is to determine the applications for “deemed native” status from persons who are not natives of Sarawak under the Interpretation Ordinance 2005. This is a legal requirement for them to deal, purchase and own Native Customary Rights land under the Sarawak Land Code.
The determination of the applications through a court hearing is the jurisdiction of the Resident Native Courts and the total applications received to-date accounts for 2,429 or almost 84% of the total registered cases under the Resident Native Courts. The remaining cases are civil appeal cases from the District Native Courts. As at the beginning of this year, 1,625 applications were still outstanding.
Tuan Speaker, with the coming into force of the Interpretation Ordinance (Amendment) 2022, the natural born children of native with non-natives are eligible to be recognised as natives of Sarawak under the Ordinance. Those who have applied to the Native Courts and are eligible may withdraw their application and apply their native status under the Interpretation Ordinance (Amendment) 2022. In this respect, I am pleased to inform this august House that the Native Courts will work closely with the Jawatankuasa Pengiktirafan Sebagai Bumiputera Sarawak atau (JPBS) to identify the eligible applicants. The applications of those who are not eligible to be recognised as natives under the Interpretation Ordinance (Amendment) 2022 will be handled by the Resident Native Courts.
Immigration And Labour Management Unit (Ilmu)
Tuan Speaker, I will now proceed with matters relating to the Immigration and Labour Management Unit (ILMU).
Delivering Better Services through Digitalisation
Further to my statement in my winding up speech during the last DUN Sitting in May this year, regarding the Foreign Workers Transformation Approach atau (FWTA) project which was being developed at that time, the Cabinet has approved the implementation of FWTA which consists of a digital platform and infrastructure development to significantly improve the efficiency and transparency of the recruitment process to non-resident workers and reduce the time for approval of applications. This will transform the current process for the recruitment of non-resident workers. ILMU also signed a Memorandum of Understanding (MoU) with the Federal Government (Immigration Department of Malaysia) regarding systems integration, data sharing and other matters relating to managing and coordinating immigration affairs in Sarawak which is a key component of FWTA system. The FWTA system owned and developed by the Sarawak Government is in the process of being integrated with the MyIMMs system owned by the Immigration Department of Malaysia following the signing of the Memorandum of Understanding (MoU). This will contribute further to improving the speed of processing and transparency of all applications received. With this integration too, the Sarawak Government will have a complete and comprehensive set of data that can be used to analyse and assist the Government in facilitating the decision-making process relating to immigration and labour.
Issues Raised by Ahli-Ahli Yang Berhormat
Mr Speaker, seterusnya saya ingin memberi penjelasan dan maklumat terkini mengenai perkara-perkara yang dibangkitkan oleh Ahli-ahli Yang Berhormat yang dirujuk kepada saya.
Next, I would like to provide explanations and the latest information on the matters raised by Honourable Members that were referred to me.
1) Foreign Workers Permit Issues for Shipbuilding Industry in Sibu
For the issue raised by the Yang Berhormat for Bukit Assek, to support the growth of the shipbuilding industry in Sarawak, the Foreign Workers Transformation Approach (FWTA) system will expedite the processing of Non-Resident Employee (NRE) applications.
The Foreign Workers Transformation Approach (FWTA) system which will be fully operational by early next year will provide a more efficient, effective process and transparent processing of all non-resident workers application including for the shipbuilding industry. By simplifying and expediting the application process through the new digital platform, we are confident that the industry needs will be met. Faster approvals would help shipyards avoid operational delays, leading to timely completion of projects.
2) Ketua Masyarakat, Ketua Kaum; dan Jawatankuasa Kemajuan dan Keselamatan Kampung (JKKK)
Community Heads, Ethnic Heads; and Village Security and Development Committees (JKKK)
For the information of all Honourable Members in this august House, the Sarawak Government is deeply concerned about the role and contribution of Community Heads and Ethnic Heads from the various races throughout the length and breadth of Sarawak. Community Heads and Ethnic Heads play a very important role not only as agents conveying government information at the grassroots level, but also in strengthening social unity in their respective areas. This is evidenced by the increase in the number of Community Head and Ethnic Head positions by 1,532 from 2015 until 2024.
At present, there are a total of 671 Community Heads and 6,921 Ethnic Heads throughout Sarawak. The total salaries and allowances currently received are as follows:
(a) 41 Temenggong with a starting salary of RM1,600 a month and an Annual Salary Increment (KGT) of RM40 a year;
(b) 88 Pemanca with a starting salary of RM1,300 a month and an annual salary increment (KGT) of RM30 a year;
(c) 542 Penghulu with a starting salary of RM1,100 a month and an annual salary increment (KGT) of RM20 a year; and
(d) 6,921 Ethnic Heads with an allowance, not salary, yes, with an allowance of RM900 a month.
Accordingly, the government has spent a sum of RM86.6 million a year for the purpose of paying the salaries of Community Heads and the allowances of Ethnic Heads. This amount involves an increase of RM12.5 million, which is 15%, compared with the year 2020.
The last time the Sarawak Government made salary adjustments for Community Heads and Ethnic Heads was in 2018. This adjustment involved an increase in salary and monthly allowance of RM100. Therefore, the Sarawak Government is in the final stage of a detailed study on the need for a new salary and allowance adjustment for KMKK in line with the increasingly challenging roles, responsibilities and workload, as well as the current economic situation.
For the information of the Honourable Member, Ethnic Heads are also the Chairmen of the Village Security and Development Committees (JKKK) in their respective areas. At present, there are a total of 6,921 JKKK institutions throughout Sarawak and 6,921 JKKK Secretaries with a total membership of 72,000 persons.
The government has allocated a sum of RM51.3 million a year for the purpose of JKKK management, which covers the payment of Secretary allowances, meeting attendance allowances and meeting operation allowances. This is the government's commitment to ensure that JKKK can play a more effective role in community development in their respective areas.
Mr Speaker, the government is deeply concerned about the need to increase the number of Community Head and Ethnic Head positions throughout Sarawak. This is to further enhance the effectiveness of delivering government services to the people. Accordingly, for the information of the Honourable Member for Tellian, Ngemah, Engkilili and Batu Danau, the government has so far received a total of 915 applications for proposals to create new Community Head and Ethnic Head (KMKK) positions from all divisions throughout Sarawak. All these applications have been examined by taking into account general guidelines covering, among others, the size of the area, the population and the increase in the number of houses in the area. These applications will be tabled to the Special Committee on the Management of Community Head and Ethnic Head Affairs for further consideration.
Mr Speaker, Community Heads who are currently serving enjoy the following facilities:
(a) 15 days of annual leave a year; (b) Hajj leave; (c) Medical facilities including for spouse and children; (d) KWSP and PERKESO contributions; (e) Annual salary increment; (f) Loyal Service Medal; and (g) Exemption from payment of licence fees for personal firearms.
For the information of the Honourable Member for Tellian, the government will study the existing Community Head and Ethnic Head Service Scheme for the purpose of improvement, including requirements after the end of service.
For the information of Honourable Member for Tanjong Batu, to strengthen and empower JKKK institutions, the Sarawak Government has implemented various programs in collaboration with various Government agencies to provide exposure and enhance their competency.
This year, a total of 50 programs were implemented with a focus on village leadership empowerment, women's entrepreneurship, integrity modules, youth excellence, bureau empowerment, agricultural kits, agroecology, village strategic action plans, disaster management, aid evaluation as well as seminars and symposiums aimed at improving progress and development at the village level.
Regarding the issue raised by the Honourable Member for Ngemah, various grassroots leadership empowerment and strengthening programs are being implemented in stages through the divisional resident offices and district offices. These programs will continue, targeting all grassroots leaders. In addition, starting from 2025, the government will introduce an induction course for all Community Heads and Ethnic Heads throughout Sarawak to enhance the competency and leadership of KMKK.
In addition, last year, the government distributed a total of 8,400 guidebooks on duties and roles to all Community Heads and Ethnic Heads and the relevant offices.
A second version of the Guidebook for Community Heads, Ethnic Heads and Village Security and Development Committees (JKKK), which is more comprehensive and thorough, is being planned.
Mr Speaker, the Divisional Level Selection Panel for Community Heads and Ethnic Heads (KMKK) is chaired by the Divisional Resident and its members include the Deputy Resident, District Officers, and State Legislative Assembly Members from the Gabungan Parti Sarawak (GPS) party. Other members will be appointed subject to needs and the current circumstances.
Upgrading of Balingian Sub-District and Padawan Sub-District to Districts
Mr Speaker, the government indeed has the aspiration to strengthen the effectiveness and efficiency of administration at division, district and sub-district levels throughout Sarawak in order to empower the delivery of public services to local communities.
For the information of the Honourable Member for Balingian and the Honourable Member for Tebedu, the government takes note of the proposal to upgrade Balingian Sub-District and Padawan Sub-District to full Districts.
However, this proposal must take into account the following basic considerations:
(a) Having a sufficiently large area with potential to contribute to high economic activity; (b) Being capable of contributing to high official activities such as generating satisfactory revenue collection; (c) Being able to improve more efficient services; (d) High population density in an area; and (e) Other basic considerations deemed appropriate by the government from time to time.
Recognition as Sarawak Bumiputera
Now I move on to recognition as Sarawak Bumiputera. Mr Speaker, for the period 1 November 2023 to 31 October 2024, a total of 3,498 applications to be recognised as Sarawak Bumiputera were received and considered by the Sarawak Bumiputera Recognition Committee. Of that total, 3,329 applications were approved, 141 applications were for review and 28 applications were not approved because they did not meet the requirements.
The requirements for an individual to be recognised as Sarawak Bumiputera are as follows:
(a) The applicant is a Malaysian citizen; (b) The applicant is a biological child born to one of the Sarawak bumiputera; and (c) One of the applicant's biological parents must be a Sarawak Bumiputera.
For the information of the Honourable Members, the Sarawak Native Recognition Application System was completed and began to be used on 2 September 2024 to enable applicants to apply to be recognised as Sarawak Bumiputera online through the Sarawak Government portal. So far, 370 applications have been made through the system. This system has proven to not only facilitate applications but also the management of applications for recognition as Sarawak Bumiputera.
Construction of Government Quarters in Daro District and Bintulu District
Mr Speaker, the government is deeply concerned about the welfare of civil servants, including housing needs throughout Sarawak, especially in rural areas. Accordingly, the Government will build a total of 3,674 quarter units throughout Sarawak, including in Daro District and Bintulu District. The project is expected to commence concurrently in phases and its implementation will be within a period of 24 to 48 months.
For the information of the Honourable Member for Daro and the Honourable Member from Jepak, the Service Quarters project in Daro District and Bintulu District is included in the priority list and is expected to commence in mid-2025. The design of the Service Quarters is based on a modern apartment concept equipped with facilities such as a multipurpose hall, laundry facilities, a surau and a convenience store for the convenience of civil servants.
Construction of Lingga District Office and Maludam Sub-District Office
For the information of the Honourable Member for Lingga, the site for the construction of the Lingga District Office and the Maludam Sub-District Office has been approved by the State Planning Council. Both projects are expected to commence in the third quarter of 2025 and the implementation period of the projects is 24 months. The implementing agency for both projects is JKR Sarawak.
The Sarawak Ombudsman
Now, I move on to the Sarawak Ombudsman. I would like to inform this Honourable Members of this august House that the role of the ombudsman involves a systematic and impartial investigation of complaint related to public administration. It serves as a resource for individual seeking an alternative dispute solution for injustices suffered by them resulting from maladministration. The Sarawak Ombudsman is established to ensure accountable administration and to address concerns regarding maladministration as reported by the aggrieved individuals themselves.
The Sarawak Government is firmly of the bent of upholding integrity and good governance and will not tolerate any abuse of power, by those entrusted official. For the information of the Honourable Members of this House and Member for Pending, the role of the Ombudsman is not akin to an enforcement agency like MACC as they are only deal with complaint of maladministration and not to act as or omission of a criminal nature.
Mr Speaker, I also wish to record my many thanks to the Deputy Ministers in the Sarawak Premier's Department and likewise the departments under them: Sarawak Bumiputera Court (MBS), Sarawak Council for Customs and Traditions (MAIS), State Implementation Monitoring Unit (SIMU), Administration Unit (UP), Immigration and Labour Management Unit (ILMU); and Sarawak Integrity and Ombudsman Unit (UNIONS) for the efforts, cooperation and dedication of the officers and agencies in providing input for my winding-up speech today. On this occasion, I would also like to extend my congratulations and thanks to Mr Speaker and Deputy Speaker and the officers and staff of the DUN, and all state public services and federal public services who have worked hard to make our proceedings in this session a success.
Now before I end my speech, I wish to all the Christian in this august House and in Sarawak a Merry Christmas and Happy New Year 2025 to everyone.
Maka dengan ini, saya menyokong penuh Rang Undang-undang Perbekalan (2025), 2024. Sekian, terima kasih.
Accordingly, I fully support the Rang Undang-undang Perbekalan (2025), 2024. Thank you.
Thank you, Honourable Minister. With all due respect, I invite the Honourable Dato Sri Lee Kim Shin, Minister of Transport, to deliver the winding-up speech.
Terima kasih, Tuan Speaker. Selamat petang, Salam sejahtera, Salam Segulai Sejalai dan Salam Sarawak Maju Makmur.
Tuan Speaker, first and foremost, I would like to extend my heartiest congratulations to the Yang di-Pertua Negeri, Tun Pehin Sri Dr. Haji Wan Junaidi bin Tuanku Jaafar on his appointment as the Fourth Chancellor of Universiti Malaysia Sarawak (UNIMAS). We are confident that under your leadership, UNIMAS will reach a higher level of excellence especially in the fields of technology development and innovation.
I would also like to congratulate the Right Honourable Datuk Patinggi Tan Sri (Dr) Abang Haji Abdul Rahman Zohari bin Tun Datuk Abang Haji Openg, Premier of Sarawak for being conferred two prestigious honours, the Bintang Darjah Setia Negara Brunei Darjah Pertama (P.S.N.B.) which carries the title “Dato Seri Setia” from His Majesty Sultan Hassanal Bolkiah Muiz’zaddin Wad’daulah on 15th July 2024 and the Seri Panglima Darjah Kinabalu (S.P.D.K.) which carries the title “Datuk Seri Panglima”, Sabah’s highest state honour from Tuan Yang Terutama Yang di-Pertua Negeri Sabah, Tun Datuk Seri Panglima Haji Juhar Haji Mahiruddin on 5th October 2024. These awards, conferred during grand ceremonies in Brunei and Sabah, reflect the Right Honourable Premier’s exemplary leadership, dedication to fostering regional ties and significant contributions to the socio-economic development of Sarawak. Yang Amat Berhormat Premier’s achievement serve as an inspiration for future leaders and the younger generation.
Supply Bill 2025
Tuan Speaker, I would like to congratulate the Right Honourable Premier of Sarawak on the Sarawak 2025 Budget, themed “Together Building a Prosperous Future” with RM10.9 billion allocated for development and RM4.9 billion for operating expenditures. This budgets prioritises infrastructure growth and the well-being of the rakyat. It reaffirms the government’s commitment to easing the financial burdens of low and middle income groups while continuing to implement vital, people-centric programmes and projects that will drive Sarawak’s progress and prosperity.
I applaud the allocation of RM1.49 billion for the transport sector in the Sarawak 2025 Budget. This comprehensive investment covers roads, bridges, riverine infrastructure, ports, land and riverine transport; aviation services and various special development projects under Projek Rakyat. This shows that the GPS Government remains dedicated in its commitment to providing the rakyat with accessible and efficient transportation across Sarawak.
I fully support the Supply Bill presented by the Right Honourable Premier and look forward to continued progress in this sector. As our development efforts advance, I hope for increased allocations in the future to further enhance Sarawak’s transport infrastructure and connectivity.
Passing of Bills 2024
Tuan Speaker, this august House has successfully passed two important Bills which are the Distribution of Gas (Amendment) Bill, 2024, and the Natural Resources and Environment Bill, 2024. I would like to take this opportunity to congratulate the respective Honourable Ministers for the efforts and thank all members for their strong support. The smooth passage of these Bills demonstrates the stability and unity of our GPS Government.
Global Direction for Transport
Tuan Speaker, transport is fundamental to support economic growth, generating employment and connecting people to essential services such as healthcare and education. Beyond enhancing quality of life, transport is crucial to build resilient and inclusive societies that thrive on seamless mobility.
However, transport is also one of the largest sources of global greenhouse gas emissions, responsible for nearly a quarter of the total. Recognising the urgency of climate action, the global community has set ambitious targets to achieve net zero emissions by 2050. Reaching this goal requires transformative steps in the transport sector through prioritising decarbonisation, efficiency, and climate resilience.
National Targets and Sarawak’s Transport Direction
In line with this global movement, Malaysia is targeting to increase the urban public transport modal share to 50% by 2040 under the Low Carbon Nation Aspiration 2040. In maritime, our country is aligned with the International Maritime Organisation Decarbonisation objectives by setting a goal of 40% low-carbon fuel penetration for marine transport by 2050. For aviation, Malaysia's Aviation Decarbonisation Blueprint (MADB) aims for net zero carbon emissions by 2050 through advanced aircraft technology, operational improvements, sustainable aviation fuels and carbon offsetting measures.
In Sarawak, under the visionary leadership of our Yang Amat Berhormat Premier, we have established ourselves as a national leader in green initiatives, drawing international attention and attracting foreign direct investment into our renewable energy sector.
Land Transport Sector
Tuan Speaker, Sarawak’s proactive step to develop and decarbonise public transport, beginning with the Kuching Urban Transportation System (KUTS) project powered by hydrogen energy, has aligned with the national green investment strategies and the National Energy Transition Roadmap (NETR). In the transport sector, investment in public transport development, intelligent transport systems (ITS) and green mobility infrastructure, such as walkable urban spaces that encourage active mobility are essential to enhance accessibility and reliability. These measures will promote a shift from personal vehicle dependency to public transport. Additionally, addressing the alarming rise in road fatalities has become a global priority and my ministry will look into implementing safety protocols and public-private partnership to address this pressing issue.
Maritime and Riverine Transport Sector
Tuan Speaker, maritime transport is crucial to global trade as more than 80% of goods are transported by sea. With maritime transport being responsible for 2% - 3% of global greenhouse gas emissions, the International Maritime Organisation aim to cut emissions by 50% by 2050 through advocating for cleaner fuels like LNG, hydrogen and ammonia, along with innovations such as electric propulsion, and the carbon capture technologies.
Sarawak has significant potential for economic growth through maritime and riverine transport. My Ministry is focused on strengthening the river economy by adopting advanced system to enhance safe navigation and upgrading riverine infrastructure to improve connectivity and boost trade.
At the same time, my Ministry will explore sustainable and efficient river transport options as well as leverage on technology to optimise operational efficiency and minimise environmental impacts. With these efforts, my ministry aims to build a resilient river transport network that improves accessibility and thrives the economy.
Aviation Sector
Tuan Speaker, the global aviation sector is rapidly evolving with advancements in AI, automation and digitalisation that are revolutionising airport operations. Innovations in autonomous vehicles and drones are also set to reshape cargo delivery and airport logistic, enhancing efficiency and reducing operational costs.
The International Civil Aviation Organisation (ICAO) has also set stringent standards that call for the adoption of innovative technologies and practices to reduce carbon footprints through green airport infrastructure, cleaner aircraft technologies and sustainable aviation fuels (SAF) to meet environmental sustainability goals.
In line with these global shifts, Sarawak will also prioritise innovation and sustainability in its aviation strategy for the upcoming Sarawak owned airline and the proposed new Kuching International Airport to integrate advanced technologies and comply with sustainable environmental standards in strengthening Sarawak’s connectivity and drive economic growth.
Sarawak’s Transport Sector
Tuan Speaker, the growth of Sarawak’s transport sector is a long-term commitment, and my ministry is working in collaboration with various agencies and stakeholders to foster inclusive growth, expand access to essential services and combat climate change to build a transport network that is safe, sustainable, efficient and inclusive for our rakyat.
Land Transport And Logistic Sector
Progress of Kuching Urban Transportation System
Tuan Speaker, I would like to provide this august House with an update on the developments of the Kuching Urban Transportation System (KUTS), with a particular emphasis on the Autonomous Rapid Transit (ART) project.
As of October 2024, the overall actual progress for the KUTS Phase 1 stands at 25.8% inclusive of design and engineering works, system works, procurement, land acquisition and construction works. The capital expenditure has reached RM840.47 million, reflecting the financial commitment to advancing this transformative project.
The total number of main package contracts for the KUTS Phase 1 Project awarded to date comprises nine packages, they are: five Infrastructure Package contracts, two System Package contracts, the Bus Integrated System (BIS) contract and the recently awarded contract to supply Hydrogen Buses. These packages, particularly the Infrastructure and Bus contracts, were awarded through an open tender process in full compliance with governance and procurement regulations, ensuring transparency, competitiveness and value for money.
The Blue Line Package 2 Infrastructure Contractor from Stutong to Hikmah Exchange was through open tender and 13 bidders were received. The contract was awarded to Perbena Emas Sdn Bhd, China Road and Bridge Construction Joint Venture on 30th August 2024 with a contract sum of RM804.7 million.
The Bus Integrated System (BIS) package was also through open tender and five bidders were received. The contract was awarded to Shorefield Sdn Bhd, China Huaxin Malaysia Sdn Bhd and Kentkart International LLP JV on 29th August 2024, with a contract sum of RM55.5 million. This package comprises nine integrated sub-systems: the Planning, Scheduling & Dispatching System (PSDS); Fleet Tracking System (FTS); Bus Operation Control Center (BOCC); Automatic Fare Collection (AFC); Bus On-Board System (OBS); Centralised Reporting System (CRS); Computerised Maintenance Management System (CMMS); Information Technology System (ITS); and a Cloud Architecture for overall system integration.
The construction works for the Rembus Depot, Blue Line and Red Line which commenced earlier this year and are currently in progress with the main building’s foundation works, utility relocation works and structural works for the stations including the construction of the new ART bridge at Sungai Kuap.
After phase one of the KUTS Project, it is also in the plan that another line, yellow line, will be included in the future phase.
This proposed alignment will connect Moyan to Sarawak General Hospital, addressing connectivity needs in areas currently under-served.
Bintulu-Samalaju Autonomous Rapid Transit (ART)
Tuan Speaker, for the information of this august House, a feasibility study will be carried out for the proposed Bintulu-Samalaju Autonomous Rapid Transit (ART) project, which is expected to take 12 months to complete.
Development of Lorry Terminal
Tuan Speaker, logistics is a fundamental part of the transport sector, as it involves the organised and efficient movement of people and goods.
The Miri lorry terminal, the first of its kind to be built, will play a dual role in supporting efficient logistics operations and facilitating public transport goals by enhancing road safety, reducing congestion and stimulating local economic growth by creating jobs.
My ministry will work with members of the Sarawak Public Transport Committee (SPTC) and also with the divisional level which includes the local councils and other relevant agencies and private stakeholders to identify suitable sites for the lorry terminals for major urban centres and lorry parkings for towns throughout Sarawak. By providing designated areas for trucks and lorries to load, unload and park, lorry terminals can reduce the congestion caused by large vehicles on urban roads and optimise logistics networks.
Smart Bus Service
Tuan Speaker, the 14 units of smart buses in Miri were recently launched by Yang Amat Berhormat Premier in October as a free new bus service in Miri, making it the first city in Sarawak to have free public stage bus services. This is part of the Miri Smart Bus Programme, with an approved allocation of RM10 million under the 12th Malaysia Plan for an initial period of two years and will continue under the 13th Malaysia Plan.
These brand-new buses were purchased by Miri City Bus Sdn Bhd to replace the old buses aimed at enhancing urban mobility and providing quality stage bus services to the rakyat. This service is expected to significantly benefit the B40 group, students and the elderly by improving accessibility. It is also an added attraction to tourists as they can move around the city, conveniently enhancing Miri’s appeal as a tourist city.
These new 12-metre-long Volvo buses, which can accommodate up to 54 passengers, are more than just vehicles; they represent a key part of our vision for Sarawak and our commitment to provide an integrated, safe, affordable and efficient public transport system. This initiative also aligns with the Greater Miri Development Masterplan and supports my Ministry’s efforts under the Miri Urban Transport Action Plan.
Additionally, the buses are also equipped with Global Positioning System (GPS), CCTV cameras, onboard Wi-Fi, a black box that includes features such as vehicle data recording, telematics unit, driver monitoring system and thoughtfully designed low-floor ramps for persons with disabilities (OKU).
The Bus Signal Priority (BSP) technology has been installed in six buses and has passed the Proof of Concept (PoC). The BSP technology will be installed on the remaining eight buses in stages. This will enhance traffic flow and minimise delays as they approach traffic light intersections, ensuring smoother and more reliable service for commuters. The routes offered include Permy Jaya (four buses), Sungai Rait/ Bakam (one bus), RTM/ Pujut 2 (one bus), Kuala Baram (one bus), Hospital (one bus), Riam/ Taman Tunku (two buses), Senadin (two buses) and Tudan (two buses).
Since the launch of the free stage bus services, this initiative has received an overwhelmingly positive response from the public and many have shared how the service has improved their daily commutes and helped them save on travel costs, allowing greater access to places of interest such as commercial areas, hospitals, city centres and many more. Families can also travel easily and affordably around the city, which has made many spontaneous family weekend outings and enhanced family bonding. The enthusiasm and support from the public demonstrate the value of the free bus services.
Stage Bus Service Transformation
Tuan Speaker, my ministry working closely with the Ministry of Transport Malaysia, is actively involved in the implementation of the upcoming Stage Bus Service Transformation (SBST) project in Kuching through the Commercial Vehicle Licensing Board (CVLB) Sarawak. This project will see the introduction of 56 new stage buses operating across 10 routes in Kuching, further improving public transport services in the city. The routes will cover areas in Kuching such as Bau, Serian, Bako, Kampung Benuk, Batu Kawa, King Centre, Muara Tebas, Taman Malihah, Sekolah Menengah Kebangsaan Matang Jaya and Sekolah Menengah Kebangsaan Agama Matang 2. This project will involve an allocation of RM79.18 million over five years under the Federal Government SBST allocation.
The new buses, fully equipped with CCTV, on board Wi-Fi, Global Positioning System (GPS) tracking and OKU friendly features are set to launch early next year.
Border-Crossing Improvements
Tuan Speaker, as part of our ongoing efforts to improve border crossing efficiency and alleviate congestion, I am pleased to announce to this august House that the Sg. Tujoh Immigration, Customs, Quarantine, and Security (ICQS) Complex in Miri will undergo significant upgrades. This will include the addition of extra lanes and counters to ensure smoother traffic flow.
The project, valued at RM4.0 million, was approved by Yang Amat Berhormat Premier during his visit on 7th March 2024, and is fully funded by the Sarawak Government. This project is targeted to tender through JKR Sarawak in November 2024.
Meanwhile, my ministry, in collaboration with Regional Corridor Development Authority (RECODA), is working to address bottleneck issues at ICQS checkpoints in the Limbang Division. These checkpoints include ICQS Tedungan (from Limbang to Kuala Lurah, Brunei), ICQS Pandaruan (from Limbang to Temburong, Brunei), ICQS Mengkalap (from Lawas to Temburong, Brunei) and ICQS Merapok (from Lawas to Sabah).
Implementation of Smart Traffic Lights
Tuan Speaker, Sarawak is making great strides in urban traffic management with the implementation of the Sydney Coordinated Adaptive Traffic System, or SCATS. Currently, 140 out of 327 traffic light intersections are connected to the SCATS server, which is managed by the Sarawak Multimedia Authority. Efforts are ongoing to integrate the remaining 187 intersections, ensuring unified and efficient traffic planning across Sarawak.
Looking ahead, under the Kuching Urban Transportation System project, the smart traffic lights will be integrated with the Transit Signal Priority system for ART vehicles. This will ensure smoother traffic flow and enhance safety by prioritising ART vehicles at intersections.
Road Safety Initiatives
Tuan Speaker, for the information of this august House, road accidents in Sarawak are indeed alarming. Based on the Royal Malaysia Police Department (PDRM) report, Sarawak has recorded a total of 16,279 road accidents for the year 2024 up to the end of September. Out of these 16,279 road accidents, there were 136 serious accidents and 294 deaths. Based on the statistics collected this year, motorcars recorded the highest number and accounts for more than half of the total number of cases, followed by motorcycles and four-wheel drive vehicles which shows the need to increase awareness among road users.
In our ongoing efforts to enhance road safety awareness, my ministry collaborates closely with the PDRM, Road Transport Department (JPJ) Sarawak and relevant agencies to implement road safety awareness campaigns. The campaigns are held annually before any major festive season such as Chinese New Year, Hari Raya Aidilfitri and Gawai festival in various divisions such as Kuching, Sibu, Bintulu and Miri as a continuous effort to promote road safety awareness among road users and travellers during the festive season.
Further to road safety campaigns, my ministry is planning to launch the Sarawak Traffic Games (STG) which will be held on the 23rd November 2024 in Miri. This will be the first Sarawak Traffic Games to be organised since the last one held in 2015. The Sarawak Traffic Game will be conducted across Sarawak to teach school children essential road safety skills in an engaging and hands-on way. It aims to enhance safety awareness, reduce accidents and introduce basic traffic rules, road signs, and signals in a fun and memorable format. Following the event in Miri, other divisions, including Kuching, Sri Aman, Sarikei, Sibu and Bintulu, will also host the game. My ministry has provided funding for the improvements of the six traffic gardens located in Kuching, Sri Aman, Sarikei, Sibu, Bintulu and Miri.
I also urge every driver to observe posted speed limits on the roads and drive responsibly. I hope with the installation of radar speed detection signs, just like the recent one in Miri, it can serve as a reminder for drivers and motorists to adhere to the permitted speed limit.
My ministry through the Transport Awareness Behavioural Change (T-ABC) programme also aims to instil road safety awareness and behavioural change in road users through talks, exhibitions and public engagement in all 12 divisions.
Since its implementation, the T-ABC programme has been conducted in Kuching, Miri and recently in Sri Aman Division. The next T-ABC programme will be held in Kapit and Limbang. The programme involved Heads of Departments, Ketua Masyarakat dan Ketua Kaum (KMKK); Non Government Organisations (NGOs), PIBGs and secondary school students as the target group.
My ministry will continue our collaboration with enforcement departments such as JPJ Sarawak, PDRM, relevant stakeholders and academia to drive awareness on road safety and behavioural change particularly in educating Pan Borneo Highway’s traffic regulation.
Trans Borneo Railway Feasibility Study
Tuan Speaker, I am pleased to inform this august House that my ministry is a member of the Technical Committee of the Trans Borneo Railway Feasibility Study. The Ministry of Transport Malaysia has tendered this feasibility study in March 2024 and is currently in the process of tender evaluations.
The study will begin upon the issuance of the Letter of Award (LOA) by the Ministry of Transport Malaysia. This study, expected to be completed within 12 months, aims to evaluate and identify potential railway models for implementation in Sarawak and Sabah.
The scope of the feasibility study is to evaluate factors such as route and station options, cost estimates, sustainable development, environmental impacts, and potential socio-economic benefits to Sarawak, Sabah, Kalimantan and Brunei.
Maritime and Riverine Transport Sector
Performance of Maritime and Riverine Transport Sector
Tuan Speaker, Sarawak, located on Borneo Island, greatly depends on marine transport for trade and the movement of goods. Historically, the rivers in Sarawak have played a crucial role in facilitating agricultural exports and sustaining local economies. Today, these waterways continue to serve as cost-effective routes for both goods and passenger movement.
My Ministry and its agencies are dedicated to advancing the maritime and riverine transport sector in collaboration with relevant stakeholders through enhancement of navigation safety, upgrading of infrastructure and promoting sustainable practices to improve accessibility, enable river economy and support Sarawak’s economic growth.
Enhancement of Navigation Safety
Tuan Speaker, the Sarawak Buoys and Lights Board (SBLB), under my ministry, is a member of the International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA). It oversees seven lighthouses, 45 channel beacons, and 72 marker buoys, all maintained to international standards with high operational efficiency of 99% for lighthouses, 98% for channel beacons, and 97% for marker buoys. The Sarawak Buoys and Lights Board also conducts hydrographic surveys, updates navigation charts and publishes tide schedules to facilitate safe coastal navigation. To date, SBLB has completed 11 surveys to measure water depths vital for shipping safety and updated 46 navigation SAR charts for Sarawak coastal waters.
Through SBLB, the upcoming projects to further enhance navigation safety include the relocation of the Kidurong Lighthouse to Tanjung Likau, Bintulu, and the Tanjung Sirik Lighthouse to Kuala Igan, Mukah which are targeted to commence in quarter one of 2025. Additionally, a Vessel Traffic Management System (VTMS) and aids to navigation will be installed at Kuala Baram and Sungai Miri to ensure safe maritime operations to support the growth of the oil and gas sector in the region.
To enhance safety near new infrastructure, SBLB has installed channel buoys at the Batang Lupar Bridge and plans to do the same at the Batang Paloh Bridge in Mukah. Marker buoys and safety signage have also been installed in Sungai Limbang to facilitate safe navigation for local and Bruneian river commuters, allowing safer river passage and reducing risks of collision.
Riverine Navigation Safety
Tuan Speaker, my ministry through the Sarawak Rivers Board (SRB) is continuously enhancing aids to navigation (AToN) along ourrivers. To date, SRB has installed 349 AToNs, including buoys, light beacons, transit markers and bridge lighting across gazetted rivers and major water bodies such as Bakun Dam, Bengoh Dam, Batang Ai and Tasik Biru to ensure safe navigation for vessels and reduce risks of collision. Additionally, the vessel surveillance and monitoring system for Sungai Sarawak has also been installed and is now fully operational.
Furthermore, a study on navigation safety in Sungai Sarawak, spanning 25 kilometres from Kuching Waterfront to Siniawan town is set to complete by the end of this year. This study will identify hazards, assess river’s economic potential and propose safe navigation channels to enhance connectivity among communities in Kuching, Padawan, Bau and Siniawan, while exploring further expansion opportunities.
Removal of Shipwrecks
Tuan Speaker, as of 31st October 2024, Sarawak Rivers Board (SRB) has identified 95 shipwrecks in Sarawak. Since 2001, 513 wrecks have been removed to improve navigation safety. SRB will continue to secure navigation channels by marking wrecks with buoys and light beacons for the safe passage of river users.
River Safety and Cleanliness Campaign
Tuan Speaker, for this year, Sarawak Rivers Board (SRB) has conducted 22 River Safety and Cleanliness Campaigns across Sarawak, engaging 4,431 participants from riverine communities with activities such as community clean-ups, boat-handling training and life jacket distribution to promote river safety and instil a sense of responsibility for river stewardship among the communities.
Following the tragic incident where a ferry carrying 20 students capsized on Sungai Kayan that resulted in three fatalities, my ministry, through SRB, acted swiftly to engage the affected community. 95 life jackets were also distributed to students from Kampung Selampit, who regularly cross the river to attend school at SMK Senibong, Lundu. A river safety briefing was also conducted for the students to raise awareness on river safety.
Moving forward, my ministry together with SRB will continue to conduct navigational safety awareness campaigns and river cleanliness initiatives to educate the public and river users on river safety practices, emergency responses and responsible river usage.
Resumption of Express Boat Operation for Kapit-Punan and Bah-Belaga Routes
Tuan Speaker, I am pleased to inform you that the express boat service between Kapit and Belaga has resumed effective from 16th November 2024. The service was temporarily suspended in March 2024 due to declining ridership as road networks have expanded to some riverbank communities, leading to operational losses for the boat operators. To facilitate the resumption, Sarawak Rivers Board has recently secured a Federal Government funded fuel subsidy of 14,000 litres per month for this route, valid until October 2025.
The service will now operate daily on alternating schedules from Kapit and Belaga, benefiting approximately 18,000 villagers along the Rajang River. The boat will serve 78 longhouses, eight schools, two clinics and other key locations such as Nanga Merit, Nanga Pila trading post, Punan Bah, Long Segaham and Belaga Bazaar, providing an affordable and convenient mode of transport for the riverbank communities. SRB has issued River Transport Permits to the express boat operators and will monitor the safe navigation and passenger safety at designated landing terminals.
Maritime Single Window (MSW)
Tuan Speaker, starting from 2024, all International Maritime Organisation (IMO) member countries, including Malaysia, are required to adopt the Maritime Single Window (MSW), a digital platform for streamlined communication between ships and ports. The Ministry of Transport Malaysia, through the National Logistics Centre is leading this initiative, which will be rolled out to all the ports in the country. My ministry in collaboration with the Marine Department Sarawak Region and other relevant agencies, is working towards the full implementation of the Maritime Single Window (MSW) system, aiming to have it fully operational in all Sarawak and Sabah ports by the first quarter of 2025.
Dialogue Session with Sarawak Maritime Industry
Tuan Speaker, the Ministry of Transport Malaysia and my ministry have co-organised a dialogue session with the Sarawak Maritime Industry in September 2024, chaired by the Honourable Deputy Minister for Transport Malaysia. The session addressed various key topics, including the reimposition of the Cabotage Policy for Sarawak, Domestic Shipping License (DSL), Protection and Indemnity (P&I), Bunkering SOPs and the Maritime Labor Convention (MLC). This dialogue was attended by about 80 representatives from the Government departments, business chambers and maritime industry players.
Training for Certified Boat Surveyor
Tuan Speaker, to enhance regulatory oversight, my ministry, through SRB, has started training personnel to become Certified Boat Surveyors for vessels 15 tons and below. This initiative is a collaboration with Malaysia Marine Department Sarawak Region (JLMWS) and the Maritime Transport Training Institute (MATRAIN). The training syllabus was jointly developed by my Ministry and MATRAIN. The first batch of 18 trainees has completed both classroom and practical training and will undergo final assessments to be accredited by MATRAIN as qualified boat surveyors.
This initiative supports SRB's plan to assume responsibility for licensing boats under 15 tons, as outlined in the Merchant Shipping Ordinance 1960 (Sarawak) and the Sarawak Rivers Ordinance 1993, ensuring a qualified and sustainable workforce for the future.
Cabotage Policy
Tuan Speaker, the cabotage policy was introduced in 1980 in Malaysia with the intention to develop local shipping companies and reduce dependency on foreign vessels, therefore allowing the local shipping industry to grow and expand internationally. To put it simply, under this policy, foreign vessels can call directly to any Malaysian port but must obtain a Domestic Shipping License (DSL) which is granted upon meeting specific criteria. However, foreign vessels are restricted to international shipments only. For example, a vessel from China may call port directly to Bintulu port for example but is not permitted to transport goods between domestic ports, such as Bintulu port and Kuching port. Hence, this policy restricts the transport of goods and passengers between Malaysian ports to Malaysian-flagged ships only.
For the information of this august House, Sarawak now leads the nation with 2,827 ships registered under 1,036 shipowners. Additionally, Sarawak plays a critical role in Malaysia’s shipbuilding and ship repair industry, producing approximately 80% of the country’s new ships. With 68 of Malaysia’s 100 shipyards located in Sarawak, this industry significantly contributes to Sarawak’s economy and Malaysia as a whole, and cabotage policy helps to protect this vital sector. In June 2024, the cabotage policy was reinstated in Sarawak to protect and enhance our local industry. Following the reinstatement, my ministry held an engagement session with Sarawak stakeholders in August 2024, resulting in a decision to form a special committee to coordinate maritime and logistics matters, address challenges and propose solutions.
In summary, cabotage policies are a strategic tool to strengthen the national maritime industry, promote economic growth, enhance security and stabilise local markets. Balancing these benefits with potential trade-offs is important, particularly in Sarawak with diverse economies where regional prices and logistical needs differ.
Aviation Sector
Tuan Speaker, I would like to inform this august House on the development of the aviation sector in Sarawak.
Performance of Sarawak Air Connectivity
For the information of this august House, there were 95,441 aircraft movements carrying 7.56 million passengers to all airports and STOLPorts in Sarawak until the third quarter of 2024.For the same period, a total of 42,381 tonnes of air cargo was transported to all the various destinations in Sarawak. This cargo includes electrical and electronic goods, oil and gas equipment, e-commerce goods, general cargo such as fabrics and clothing, including perishable goods such as fruits and fresh flowers.
Malaysia Domestic Flights
In 2024, Sarawak received an average of 406 flights weekly from other states of Malaysia to Sarawak including federal territories, compared to 373 flights weekly last year. The existing routes are served by Malaysia Airlines, AirAsia, Batik Air, Firefly and MASwings.
Kuching International Airport received the most flight frequency with 211 flights weekly, followed by Miri Airport with 86 flights, Sibu Airport - 60 flights, Bintulu Airport - 37 flights, Mulu - seven flights, Limbang - three flights and Lawas with two flights weekly. Malaysian Aviation Commission (MAVCOM) has recently approved a new domestic flight route between Kuching and Ipoh, Perak for AirAsia Berhad. However, the commencement date for operations has yet to be determined by the airline.
Sarawak Domestic Flights
For Sarawak domestic flights or scheduled flights within Sarawak, there are an average of 608 flights weekly in November 2024 connecting Sarawak major cities, towns and rural settlements under Rural Air Services (RAS). Miri airport manned the highest number with 179 flights weekly, followed by Kuching - 136 flights, Sibu - 62 flights and Bintulu - 40 flights weekly. The remainder of the flights were to the smaller airports and STOLports. The flight operations are operated by AirAsia, Firefly and MASwings. Sarawak International Flights
Tuan Speaker, as of November 2024, there are 37 international flights weekly to Sarawak compared to the first quarter of 2024, which recorded only 33 flights weekly. This is due Scoot flight expansion in June 2024 from Singapore to Sibu and Miri with an average of three flights and four flights weekly, respectively. On the other hand, I am pleased to announce to this august House that MAVCOM has approved AirAsia Berhad (Malaysia) to operate a flight route between Kuching and Balikpapan in Kalimantan, Indonesia, and a flight route between Kuching and Kunming in China. However, the tentative date of operation will only be finalised once the airline receives further approval from the authorities of destination countries.
Public Service Obligation under Rural Air Services
Tuan Speaker, my ministry, in partnership with the Ministry of Transport Malaysia, MAVCOM and MASwings, is taking proactive measures to enhance the efficiency of the Rural Air Services (RAS) through the Public Service Obligation (PSO). In the Budget 2025 presentation, our YAB Prime Minister Dato’ Seri Anwar Ibrahim assured that the Federal Government will remain committed to providing efficient, affordable, and comfortable public transport for all Malaysians. He also announced an allocation of RM209 million to sustain the rural air services in Sabah and Sarawak.
As of the third quarter of 2024, MASwings has transported a total of 253,210 passengers and 856 tonnes of cargo across the Rural Air Services (RAS) routes this year. This involved 17,560 aircraft movements, highlighting the critical demand for air connectivity in these areas. The existing RAS agreement between the Federal Government and MASwings Sdn Bhd is valid from 1st January 2019 until 31st December 2024. However, the Federal Government has agreed to extend the agreement for another year, until 31st December 2025 to enable Sarawak’s acquisition of MASwings shares and ensure that the Rural Air Services (RAS) operations can continue smoothly.
MASwings Acquisition
Tuan Speaker, the Sarawak Government and Malaysia Aviation Group (MAG), the parent company of MASWings, have reached a heads of terms agreement, which outlines that the Sale and Purchase Agreement (SPA) is expected to be signed by 31st December 2024. Upon signing the Sales and Purchase Agreement (SPA), the transfer of MASwings’ ownership from Malaysia Aviation Group (MAG) to the Sarawak Government will take six to nine months, subject to certain conditions. During this transition, MASwings will continue operating Rural Air Services (RAS) while securing necessary licences and approvals from the Ministry of Transport Malaysia, MAVCOM, and CAAM to expand internationally.
Post-acquisition, the Sarawak Government aims to position MASwings as a regional carrier within a four to seven-hour flight range, establishing Sarawak as a gateway for regional air travel. This aligns with Sarawak’s vision to enhance its profile as an international destination and attract foreign investment, with improved air connectivity playing a key role in these efforts.
Additional Flights during Festive Seasons
Tuan Speaker, my ministry is fully cognisant of the increased demand for air travel during festive seasons and school holidays. To address this, we are collaborating closely with the Ministry of Transport Malaysia, MAVCOM and the airlines to ensure that adequate flights and seats are available to various destinations in Sarawak, while keeping airfares affordable.
During the last Chinese New Year and Hari Raya Aidilfitri, the Federal Government, through the Ministry of Transport Malaysia, introduced the RM298 midnight extra flight initiative. As part of this effort, airlines added 30 extra flights and upgraded over 15 aircraft, transitioning from Boeing 737-800s to larger Airbus A330s, which can carry 300 passengers per flight.
In this regard, my ministry has conveyed to the Ministry of Transport Malaysia to continue offering similar incentives and reached out to the relevant airlines to arrange for increased flight frequencies and keep the flight fare at a reasonable price for the upcoming festive periods, including the Christmas and New Year celebrations.
Flight Disruption
Tuan Speaker, effective coordination among relevant authorities, airlines, and other stakeholders is crucial in managing the impact of natural events, such as volcanic eruptions and air turbulence, which have recently made global headlines. Most complaints related to flight incidents, cancellations, delays and ticket refunds are directly addressed by the airlines and monitored by MAVCOM in line with the Malaysian Aviation Consumer Protection Code 2016 (MACPC), which was recently updated on 1st September 2024
Miri Airport Expansion
Tuan Speaker, on 28th September this year, Malaysia’s Prime Minister YAB Datuk Seri Anwar Ibrahim approved the expansion of Miri Airport in response to a significant rise in passenger traffic. In2019, the airport handled nearly 2.5 million passengers, exceeding its capacity and highlighting the need for expansion to meet both current and future demands.
The planned expansion will include a new terminal extension and upgrades to the Rural Air Services (RAS) area, along with additional check-in counters, a new office space, updated signage and wayfinding, a new baggage handling system, improvements to the departure hall, and the addition of new passenger boarding bridges.
Present Kuching International Airport Upgrading
Tuan Speaker, Malaysia Airports Holdings Berhad (MAHB) has allocated RM95.0 million under its annual CAPEX for extensive upgrades to Kuching International Airport (KIA). Key initiatives include the installation of a new In-Line Baggage Handling System(ILBHS), refurbishment of Passenger Boarding Bridges (PBB), implementation of a Visual Docking Guidance System (VDGS),apron rehabilitation and enhancements to emergency access roads and terminal signage to bolster compliance and safety standards. Operational improvements, such as the refurbishment of chillers, substation repainting and the introduction of modern conveniences like automatic barrier gates and LED terminal lighting are also planned to enhance overall passenger and operational efficiency.
Proposed New Kuching International Airport
Tuan Speaker, my ministry is in the process of conducting a feasibility study for the proposed new Kuching International Airport (KIA), a key initiative to strengthen Sarawak’s aviation sector with a world-class facility. Designed to accommodate 15 million passengers annually, the proposed new Kuching International Airport KIA aims to address current capacity constraints and establish Kuching as a major regional aviation hub.
Sarawak Aviation Safety Talk
Tuan Speaker, the responsible use of drones in Sarawak is increasingly vital, necessitating greater public awareness of the regulations governing their operation. While drones offer significant benefits in sectors like agriculture, logistics and photography, unauthorised operations due to a lack of awareness about permits from the Civil Aviation Authority of Malaysia (CAAM) have led to unintended legal consequences. These regulations are essential to safeguarding public safety, security and privacy.
To address this, my ministry, in collaboration with CAAM, organised the Sarawak Aviation Safety Talk for the Southern Region on 13th August 2024. The event provided government agencies, industry stakeholders, and aviation professionals with key insights on topics such as Drone Regulations and Aeronautical Search and Rescue. Given the positive feedback received, the ministry plans to extend the programme to the Central and Northern Regions of Sarawak next year, further enhancing safety awareness and best practices across Sarawak’s aviation landscape.
Collaboration with the Aviation Industry
Tuan Speaker, last September, I led a delegation from Sarawak, including representatives from my ministry, Sarawak Tourism Board and Malaysia Airports Holdings, to visit Juneyao Group and China Eastern Airlines in Shanghai. During these visits, we explored the potential of establishing direct flights between Sarawak and China.
In addition, the Ministry's collaboration with SCOOT Pte. Ltd. (SCOOT) in Singapore marks a positive step towards improving accessibility to Sarawak. Discussions on increasing flight frequencies highlight a shared commitment to boost air connectivity and supporting business exchanges.
SCOOT currently operates daily flights to Kuching, three times weekly to Sibu and four times a week to Miri. This partnership with Singapore presents significant opportunities for both economic growth and cultural exchange for Sarawak.
Further discussions have also been arranged with Singapore Airlines (SIA), the parent company of SCOOT, to ensure that a full-service carrier operates the Singapore-Kuching route. This is aimed at supporting high-end tourists and business travellers coming to Sarawak, especially after Malaysia Airlines discontinued the route earlier this year.
Additionally, Batik Air has begun operating 10 weekly flights between Kuala Lumpur and Bintulu starting 1st November, this year, and will also launch 14 weekly flights between Miri and Kuala Lumpur, effective 14th January next year. This was announced following my meeting with Batik Air CEO, Datuk Chandran Rama Muthy in Kuala Lumpur on 29th October, this year.
This initiative marks a major advancement in strengthening Sarawak air connectivity, providing smoother travel between other regions and Sarawak. The direct routes are pivotal in boosting business travel, air connectivity and air cargo movement while unlocking economic opportunities.
In addition, we are advancing plans to promote the aerospace industry in Sarawak. A critical component of this strategy is the establishment of aerospace manufacturing; and Maintenance, Repair and Overhaul (MRO) of aircraft facilities. These facilities will enable Sarawak to build a self-sustaining aviation ecosystem, providing aircraft servicing and aircraft parts manufacturing, that will create a high-skilled job opportunities and reduce operational costs for airlines operating in Sarawak.
Moreover, training the next generation of aviation professionals will also be a top priority. In collaboration with the Ministry of Education, Innovation and Talent Development (MEITD); and local educational institutions, we are working to offer specialised courses in the aerospace and aviation sector. This partnership will ensure a steady pipeline of skilled local talent, equipped with the necessary skills and certifications to support the growth of Sarawak aerospace industries.
Regional Cooperation To Sustain Sarawak Transport Sector
Tuan Speaker, my ministry represents Malaysia as the Head of Delegation for the Brunei Darussalam–Indonesia–Malaysia–Philippines East ASEAN Growth Area (BIMP-EAGA) Transport Cluster. At the recent meeting, my ministry discussed key developments and collaboration with the member states for matters in Land Transport, Maritime and Aviation. The inclusion of the Kuching-Singkawang Bus Route in the BIMP-EAGA MoU on Cross-Border Movement of Commercial Buses and Coaches was discussed, as well as a need to review the transport MoUs to align with current needs. My ministry will continue to actively advocate for Sarawak’s interests within the BIMP-EAGA region and work towards enhanced development, stronger regional connectivity and shared prosperity.
Response To Specific Issues Raised By Honourable Members Of This August House
The Honourable Member for Daro and Katibas
Tuan Speaker, for the information of the Honourable Member for Daro and Katibas, my Ministry will collaborate closely with the Divisional Public Transport Committee (DPTC) headed by the respective residents to come up with the proposal for Bus Terminal and Integrated Transport Terminal in the upcoming 13th Malaysia Plan.
The Honourable Member for Batu Kitang
Tuan Speaker, for the information of the Honourable Member for Batu Kitang, the issuance of the E-Hailing Vehicle Permit (EVP) in Sarawak falls under the purview of the Commercial Vehicle Licensing Board (CVLB) Sarawak. At the moment, there is no application from any local private company to CVLB Sarawak for e-hailing licence. Besides, Sarawak Metro as the implementer of the Kuching Urban Transportation System (KUTS) project, is currently working on integrating e-hailing services to enhance last-mile connectivity to the Autonomous Rapid Transit (ART).
The Honourable Member for Pelagus
Tuan Speaker, for the information of the Honourable Member for Pelagus, I am pleased to inform this august House that the Proposed Kapit Bus Terminal project has been approved with a scheme value of RM30 million. However, only RM1 million ceiling is provided under the 12th Malaysia Plan for the purpose of paying the consultancy fees, site selection and preliminary design for the construction phase. The physical project will be implemented under the 13th Malaysia Plan.
The Honourable Member for Tamin
Tuan Speaker, for the information of the Honourable Member for Tamin, the stage bus service between Sibu and Selangau was discontinued by the bus company because its 81 km route is not eligible under the current RM1 subsidy policy. This policy, effective from January 2024, only benefits stage bus routes below 40 km. However, my ministry will review the performance of the RM1 subsidy programme and develop new initiatives and programmes to ensure the continuity of affordable stage bus services for the public including the routes from Sibu to Selangau, under the upcoming 13th Malaysia Plan.
The Honourable Member for Jepak
Tuan Speaker, for the information of the Honourable Member for Jepak, my ministry through Sarawak Rivers Board will study the feasibility and requirements for the jetty at Kampung Kuala Segan Sungai Tengah before submitting a project proposal under the 13th Malaysia Plan.
The Honourable Member for Pending
Tuan Speaker, I now wish to respond to the allegations made by the Honourable Member for Pending.
First, on the contract package related to the 15 units of hydrogen fuel cell feeder buses, which was awarded by Sarawak Metro Sdn Bhd to a joint venture company consisting of SKS Coachbuilders Sdn Bhd and Sun Credit Sdn Bhd. I wish to clarify that the contract awarded, which was valued at RM122,441,222 million, consist of among others, the Chassis, Bus System and Bus Body which is RM81,753,375 representing 66.77% of the total amount to… (Interruption)..
Yang Berhormat Menteri… (Interruption)…
That amounts to… (Interruption)…
Yang Berhormat Menteri, if I can intervene your figure RM122,441,222… (Interruption)…
RM222… (Interruption)…
Million?… (Interruption)…
Ya, that’s right. Million…(Interruption)…
Should we say or should it be in Ringgit? Or you, you just delete the million. Otherwise, it would be… (Interruption)…
A point, oh, sorry… (Interruption)…
Is that correct?… (Interruption)…
Million, ya, ya… (Interruption)…
Ya, it’s… I leave it to you… (Interruption)…
Ya, million. Ya, ya, RM122 million. Ya, ya… (Interruption)…
Yang Berhormat Menteri, I think delete the word million after the figure. Or, should be okay… (Interruption)…
Ya, ya. After the figure. Ya, million, ya… (Interruption)…
Yang Berhormat Menteri, I think delete the word million after the figure. Or should be okay… (Interruption)…
Ya, ya. After the figure. Correct. After the figure. Million, ya… (Interruption)…
Proceed… (Interruption)…
Ya, ya. That amounts to RM1,486,425 million per unit of bus. Not over RM2 million, RM1,486,425 per unit of bus.
For the information of this august House, the other items in the contract package are: preliminaries and general, training, documentation which includes the training manuals, full scope maintenance services during the warranty period, 36 months full scope maintenance services after the warranty period, tools, supply of major components swing units, design for customisation and tailor-made specification; and the provisional sum which includes spare parts and consumable items after the warranty period, including relevant taxes and duties, amounting to a total of RM40,687,847 (33% of the overall cost).
Secondly, on the Member for Pending’s allegation that: “SKS Coachbuilders Sdn Bhd, a West Malaysia company has teamed up with Sun Credit Sdn Bhd, a local company to meet the tender requirements set by Sarawak Metro”, this is also incorrect. For this tender exercise, the participation of a Sarawak local partner was not listed as a requirement.
Thirdly, the Member for Pending insinuated that Sun Credit Sdn Bhd, the Sarawak-based partner in the joint venture company, was unqualified to win the tender as the Honourable Member highlighted that it was “a company whose main business is general trading and has a paid-up capital of only RM100”. For the information of this august House, the contract was awarded to the joint venture company between SKS Coachbuilders Sdn Bhd and Sun Credit Sdn Bhd, where SKS Coachbuilders is the lead partner, with a 70% equity in the joint venture company while the remaining 30% is owned by Sun Credit Sdn Bhd. In law, the joint venture partners would be jointly and severally liable for the due performance of the contract. SKS Coachbuilders Sdn Bhd, established in 1997, has 27 years of experience in the bus industry and has a paid up capital of RM20 million. Whereas, the Sun Credit Sdn Bhd only play a minor role in this contract, whereby they are only to provide temporary infrastructure facilities such as for temporary stabling and minor maintenance services. Nevertheless, both the companies would be jointly and severally liable for the complete performance of the contract.
Fourth, on the Member for Pending’s allegation that Sarawak Metro lacked the competency in the evaluation process of this tender, as the contract was awarded to a JV company that had not fulfilled the profitability requirement that had been set. For the information of this august House, the requirement in question is an industry standard – to require that the average net profit for the last three financial years must be positive, and for a joint venture, a minimum of two partners, including the lead partner, must show positive net profit. This open tender was advertised on 22nd May 2024. A total of six bidders participated. All tenderers were required to submit their audited financial statement for the year 2020 to 2022, as the audited financial statement for the year 2023 for each tenderer will only be available by quarter 3 of 2024. Based on the submissions, all tenderers did not comply with the above requirement. Thus, the evaluation committee decided to seek approval from the Tender Approval Committee (TAC) to waive the above requirement based on the following reasons:
(a) Based on analysis, the year 2020 to 2022 was during the COVID-19 pandemic period; hence, all tenderers were facing financial losses; (b) This package tender has been called for the 2nd time, ie. retender; and (c) If it goes through another tender exercise, it will yield the same results and cause further delay to the project timeline.
Upon approval by the Tender Approval Committee, the evaluation committee proceeded to evaluate the tender submissions by all tenderers. After going through detailed and comprehensive evaluation exercise, the evaluation committee proposed to the Tender Approval Committee to award this contract to SKS Coachbuilders Sdn Bhd & Sun Credit Sdn Bhd joint venture based on the following reasons:
(a) This joint venture company passed all the necessary technical and financial requirements as well as going through proper clarification exercise. Financial requirements include sufficient credit facilities and cash in hand whereas the technical requirements include written commitment and pledged partnership from their Technology Partners with a proven track record in manufacturing and supply of hydrogen fuel cell buses;
(b) The JV company offered the lowest commercial proposal among all the qualified bidders. The second lowest qualified bidder offered 34% higher and the highest qualified bid offered 119% higher; and
(c) It is noted that SKS Coachbuilders Sdn Bhd, which is the lead partner in the joint venture company, has good financial standing with sufficient credit facilities to execute this contract.
Fifth, the Member for Pending accused Sarawak Metro of lacking integrity in its process of this tender exercise, as the Member alleged that the JV company of SKS Coachbuilders Sdn Bhd and Sun Credit Sdn Bhd had not met the requirement of having “at least one working hydrogen bus Prototype and/or working hydrogen bus developed and/or manufactured and/or supplied /sold within the year 2016 to 2023”.
For the information of this august House, the technology partner of the successful tenderer is CRRC Electric Vehicle Company Limited from China, which has developed, manufactured and supplied hydrogen fuel cell buses over the years.
For the information of this august House, all these procurement processes have adhered to strict procedures and good governance practices which are subjected to audit. In light of the aforesaid clarifications and facts, the allegations made by the Honourable Member for Pending are misleading and malicious. As an Honourable Member of this august House and a lawyer by profession, she ought not to rely on incomplete and unverified information and make allegations and insinuations based on her own assumptions and libellous connotations.
With regards to the three hydrogen buses…
I am not giving way… I am not giving way and it’s nothing to do with you.
(Inaudible)..
Sit down, sit down. Padungan…
(Inaudible)..
I am not giving way, I have not finish yet, you sit down.
Ahli Yang Berhormat Padungan, Order.
I am not giving way, please observe the Standing Order. Standing Order 33(a)…
Order! Order! Ahli Yang Berhormat Padungan, sit down, sit down.
I am not giving way, I am not giving way, you sit down, you sit down this is my floor. No… I have no…
Order…
No…. no…
Order…
No… no…
Order, Padungan sit down, please.
No… no… I have given, Tuan Speaker… Tuan Speaker could you ask the Honourable Member to sit down his arguing over the Standing Order 33… I am not giving way…
Order! Yang Berhormat, please sit down, he is not giving way, he is not giving way. Let the Minister finish.
I am not giving way, I have not finish, I have not finish, I have given a comprehensive clarification point by point, no… these are the facts, these are the facts that receive…
Listen to the Minister… YB Padungan! If you persist, YB Padungan if you persist, I am going to decide you have, to not speak… sit down please… sit down please, give chance to the Minister to finish… no way… no way…
These is against the Standing Order; I have not given… I have the right to give way or not to give way…
Padungan…
You sit down, you are not behaving yourself in this DUN.
Padungan…
You are going against the Standing Order.
Padungan… this is my last warning to you, my last warning to you, you have to sit down, please sit down.
Ah… I bet to remember, don’t even understand the Standing Order.
Yang Berhormat Minister, Yang Berhormat Minister please finish your… ya…
Tuan Speaker, Tuan Speaker, it’s only fair I have given a very comprehensive clarification, point by point, if you don’t like it, ya… it’s a different matter… but these are the facts that I have got, alright and no argument sit down… sit down...
Yang Amat Berhormat Padungan, please sit down.
With regards, okay, Tuan Speaker, with regards to the three hydrogen buses that are on trial operation by Sarawak Metro raised by the Member for Pending, I wish to inform this august House that the three hydrogen buses have been on trial operation for five years. Currently, the trial operation is temporarily suspended as the three buses have to undergo mandatory maintenance exercise with critical replacement parts from China expected to arrive by the end of November 2024.
(Inaudible)..
The purpose… now let me finish…
Sit down, Padungan…
You… Let me finish…
Sit down, Padungan…
Tuan Speaker… Tuan Speaker, it is really unnecessary…
He is not giving way; he is not giving way…
Ya… I am not giving way, it is my floor, it is up to me, ah… so you have to observe the Standing Order as a respected member here you don’t even respect the…
Proceed Minister, proceed Minister.
The purpose of this trial operation is to collect necessary data and to engage the performance of the hydrogen buses, which is also monitored by the manufacturer. The performance and data collected have enabled us to include the performance requirements in the design specifications for the procurement of 55 units of hydrogen fuel cell buses which have just been awarded recently.
Tuan Speaker, I will now response to the Honourable Member for Padungan, who quoted the failure of hydrogen buses, mostly in European cities. Tuan Speaker, according to the International Association for Public Transport (UITP), in 14 countries across Europe, a total of 181 hydrogen buses are currently in operation, orders have been placed for 705 hydrogen buses, and tender exercises are ongoing for 149 hydrogen buses. As for Asia, it was recently reported September 2024 by the website, hydrogeninsight.com that South Korea’s Ministry of Environment has unveiled a new national budget to have 21,200 hydrogen-powered buses on the country’s roads by 2030, up from the present 1,185 hydrogen buses in this year, 2024.
And this year, it was reported by the website sustainable-bus.com (July 2024) that one of Hong Kong’s public transport operators will operate 147 double-deckers buses powered by hydrogen fuel cells. The operator has also set the goal of operating a fully zero-emission bus fleet by 2045.
As for development in Greater China, according to the website fuelcellsworks.com, in 2022, the country has registered 8,198 units of hydrogen fuel cell vehicles in operation, including 4,241 units of hydrogen fuel cell buses. One of the latest news on hydrogen buses in China, came from the website hydrogen-worldexpo.com in May this year, where it was reported that 55 hydrogen-powered buses will be brought into circulation in Beijing.
And over in America, the website sustainable-bus.com reported that hydrogen fuel cell bus figures grew strongly in 2023, showing a 26% increase, with the State of California alone aiming to have…
Minister, he is raging about the point of order.
No… no, I’m not giving way.
(Inaudible)..
One of Point of Order. I think Minister, it’s a Point of Order. Let’s listen. What is the Point of Order that you have it? Hold on.
The Point of Order, the Standing Order that we just recently passed in this House whereby nobody can refer to, no members can refer to websites, news, reports for information which he’s unable to...
What is that, what Standing Order you… (Inaudible) the new one, 32.
The new one, 32. Standing Order 32.
No, which part that he quoted just now?... (Inaudible) Is that verified?
Tuan Speaker, ya the Honourable Member for Pandungan also quoted the websites. I am responding to you. He also quoted on this website. Tuan Speaker, let me continue. (Interruption)
Yes, on or not then. Okay which part of your speech that you referred to? 145, which one? (Interruption) Which one in this speech?
Tuan Speaker, the Honourable Member for Pandungan, he quoted from the website, his website so I responding to you, your other websites to counter what you have said. What’s wrong with that? You started it, so since you... (Interruption)
You just continue…
Ya, I’ll continue. Okay now.
Tuan Speaker, many regions are investing in hydrogen as a long-term solution… (Interruption) ya hydrogen website is a, ya (Inaudible) no, no, it is from the website. No, you first of all, you first verify your website. You quoted the website and all the... since 2001, let me finish first. Let me finish.
Tuan Speaker, let me finish. Many regions are investing in hydrogen as a long-term solution, anticipating economies of scale and future cost reductions. With countries all around the world…
Just proceed…
...increasingly adopting hydrogen technology, particularly for public transport, we must seize the opportunity to keep pace with global innovation. With the recent advancement in hydrogen production, fuel cell’s evolving technology is improving its efficiency, which is expected to reduce the operation cost. As such, hydrogen buses offer a more sustainable option, which is in line with our Green Economy roadmap. We must take this opportunity to build a competitive edge, positioning Sarawak as a participant in the global green economy. While the Honourable Member referenced a website citing data from over two decades ago, I find it perplexing that such outdated information is used to assess the current hydrogen transit initiatives.
Even though a quote from 2021 was highlighted, it is crucial to note that this data was collected during the COVID-19 pandemic, a period that saw drastically reduced ridership. The low revenue during that time was not necessarily a reflection of technological inefficiencies but rather an inevitable result of the global health crisis. To claim technological failure without acknowledging this context is misleading. Moreover, hydrogen technology has made significant advancements in recent years. It is vital for any discussion in this august House to reflect the current state of technology, future trends and the broader benefits of hydrogen initiatives, including their alignment with Sarawak’s Green Economy Agenda. These projects are not just about transit, they aim to create job opportunities, drive innovation and achieve zero carbon emissions. Therefore, I urge the Honourable Member for Padungan to adopt a more professional and comprehensive approach in his critique. Any statement made in this august House should be well-researched and reflective of current realities to avoid misleading both the House and the public. “Jangan jadi seperti katak di bawah tempurung”. I wonder why the Honourable Member for Padungan only quotes on the failures starting from the year 2001, which is 23 years ago; while the rest were ranging from 20 years ago, with the latest data being the year 2019 and 2021 which is during the COVID-19 pandemic. These data are outdated and do not reflect the present realities of advancement in hydrogen technology.
Hold on Yang Berhormat Minister. If you can let me intervene a bit just for clarification on this issue of the Standing Order, okay? It is not invalid. It is not improper to refer to the website. By referring to the website, which is properly displayed in the internet, with all the particulars which are very clear to which website you referring to, their establishment and so on. You can rely on data which are not controversial. This is from my understanding, ya? If you refer to any social media, Instagram, WhatsApp, whatever including anything on the internet for which the information are controversial for example over the character of somebody, over activity of somebody and things like that, maybe that you need to verify. So, in this case, I see that Yang Berhormat Menteri has done his research based on the information on certain established website, okay?
…(Inaudible)…
Tuan Speaker, the floor is mine. You have given the verification let me continue, Tuan Speaker… (Inaudible)..
Tuan Speaker, verification? Wait. Just to clarify on the ruling on this reference to the website. Yes, I stand guided and very much appreciated on your ruling on this say that quoting on the website. Yes, the Honourable Minister did quote from the website to say that there are 4,000 over hydrogen buses used now in operative in China but what he has not disclosed is, in China, there are 700,000 transit buses operating in China. Only, let say only 1% is hydrogen bus, and he did not disclose… (Interruption)…
No, no, I am now... (Interruption)…
That is not the matter to dispute. See, the thing is, no, no… (Interruption)..
…(Interruption)… You are referring to… (Interruption)…
…(Interruption)… You are transgressing to another matter, another point, no, no, no.
…(Interruption)… They are totally out of point… (Interruption)…
No, no, no… (Interruption)…
Tuan Speaker, Tuan Speaker… (Interruption)…
…(Interruption)… My clarification just now, on my ruling, okay, is the fact that relying on data, established data in the website which referable okay? Whether he refers to any other website, for which I am referring to, whether he has done so, that is immaterial… (Interruption)…
That is why he is misleading the Dewan.
No, No… (Interruption)…
No misleading because you mentioned about hydrogen, so I reposted about hydrogen not comparing to ordinary buses and this is just the beginning, you are quoting outdated data… (Interruption)
…(Interruption)… 10 minutes.
…(Interruption)… 23 years ago… (Interruption)
Yang Berhormat Minister… (Interruption)…
How can be applicable for today?
Yang Berhormat Minister, ya.
Don’t argue for the sake of arguing.
You… (Inaudible)… for a clarification.
You sit down, I haven’t finished yet, you sit down, I haven’t finished yet, sit down and listen attentively, okay?
Proceed, proceed.
Right?
Proceed, proceed Yang Berhormat Minister.
You don’t forget Standing Order… (Interruption)…
Sit down Padungan… (Interruption)…
…(Interruption)… Minister give way and then for you to sit down.
…(Interruption)… Member for Padungan, please sit down.
Tuan Speaker, Digitalisation and Innovation.
No, no, please sit down.
On 21st August 2024, that is the problem… (Interruption)…
Proceed, please proceed.
…(Interruption)… when they made allegations, we have the right to rebut, rebuild the facts, what is wrong with that and I am giving a very comprehensive clarification point by point, crystal clear and he cannot accept the fact. That is up to them whether they want to accept it or not. But those are the facts that I have got, you see?
They can, YB Minister, I think, we can leave it to the code of opinion and so on and whoever to judge, where they have gone wrong or otherwise.
Okay, Tuan Speaker. Okay, let me continue. I still got a number of pages here.
Contribution Of Mots
Digitalisation and Innovation
Tuan Speaker, on 1st August 2024, my ministry was honoured to receive the Best Data Cataloguing Agency 2024 award during the Sarawak Government Digital Week 2024. This recognition not only acknowledges my ministry’s achievements in data management but also marks a significant step forward in advancement of digitalisation in Sarawak.
In addition to our progress in digitalisation, my ministry is committed to driving innovation, especially in service delivery, to provide better solutions for community challenges. Last October, a team from my ministry for the first time reached a significant milestone by qualifying for the state level in the 2024 Sarawak Civil Service Innovation Convention Awards (SCSICA). This achievement is not only a source of pride but a motivation for the officers to come up with more innovative ideas and solutions in the discharge of their duties and responsibilities to improve efficiency and effectiveness of the Ministry.
Conclusion
Tuan Speaker, on 22nd August 2024, my ministry proudly celebrated the 5th Anniversary of the Ministry of Transport, Sarawak. This milestone reflects five years of dedication and progress in enhancing Sarawak’s public transportation system, serving as a catalyst for economic growth and improved quality of life. By strengthening connectivity, we aim to unite communities, boost the economy and advance our vision in line with PCDS 2030.
These achievements were not made alone. They were the result of strong collaboration between the government, the private sector, and most importantly, the rakyat. To our dedicated civil servants, industry leaders, and local communities – your contributions have been invaluable and highly appreciated. And to Sarawakians in general, thank you very much for your continuous support and trust in our shared vision.
Before I conclude, I would like to express my profound gratitude and appreciation to all the agencies and stakeholders that have collaborated with my ministry, especially Ministry of Transport Malaysia and agencies under their purview including the Malaysian Aviation Commission (MAVCOM), Civil Aviation Authority Malaysia (CAAM), Road Transport Department (JPJ) Sarawak, Sarawak Commercial Vehicle Licensing Board (CVLB), Marine Department Sarawak as well as the Royal Malaysia Police (PDRM). Additionally, our appreciation extends to all state agencies including those at the divisional level who have assisted us in one way or another.
I would also like to extend my heartiest appreciation to Yang Berhormat Datuk Amar State Secretary, Yang Arif Dato Sri State Attorney-General and Yang Berbahagia Dato Sri State Financial Secretary for their continuous support. On the same token, I would also like to take this opportunity to express my sincere appreciation to Tuan Speaker and the team; and all the staff of Dewan Undangan Negeri Sarawak for their dedication and efficiency in handling the proceedings of this august House. Before I conclude I have several pantun. Pending have left already.
Mak Yong ke pasar membeli kueh chap, Naik ART singgah ke Pending, Berhati-hatilah sebelum berucap, Salah berucap kepala pening.
Hujah pembangkang jangan percaya, Faktanya lapuk suka mempertikai, Wahai rakyat janganlah terpedaya, Pembangkang memang tak boleh pakai.
Projek ART sedang dilaksana, Mesra alam mesra pengguna, Menghubung rakyat ke sini ke sana, Bukti GPS sangat berguna.
YAB Premier pemimpin berwibawa, Memimpin Sarawak bumi tercinta, Belanjawan dibentang penuh wibawa, Untuk kesejahteraan rakyat jelata.
And lastly with two pantun in Iban.
Bakar langit terang benderang, Dipancar bulan terang ke siang, Parti GPS merik pemansang, Rakyat Sarawak ngasai pengelantang.
Bunyi lagu berkikis bulu betis, Betanda berami enggau temuai, Nadai dinga sebana pemedis, Rakyat hidup segulai sejalai.
Akhir sekali, saya ingin mengambil kesempatan ini untuk mengucapkan Selamat Hari Krismas, Selamat Tahun Baharu 2025, dan Selamat Tahun Baharu Cina kepada semua rakyat Sarawak dan semua Ahli-ahli Yang Berhormat dan semua termasuk Tuan Speaker dan semua yang terdapat dalam Dewan yang mulia ini. Semoga Sarawak terus maju, makmur, kekal harmoni, dan sentiasa diberkati. Sekian, terima kasih.
Yang Berhormat Menteri, I think it’s important that I say this about the proposed, what you call that amendment to our standing orders which was referred by Yang Berhormat Padungan. It is not improper for us to refer to any website to get information from there. If that website is verified to be an established website. What this amendment was zealously guarding, ya, this Dewan from any what you call it, impropriety is that concerning statements which contain allegations or something which is controversial.
For which they would like to rely upon in order to make the speeches or rely on the debate to attack on any other party. So, to me what you did Yang Berhormat Menteri was right. I mean you quoted the websites in full, and you stated all the data and the information you quoted were not controversial. They are for meant for, for all to see. So, whether someone disagree with you that is another point whether you have to refer to, I mean counter check with 700 other websites that is immaterial. So, what you relied upon in your winding up speech is proper.
So that's why I ruled that way just now. And to say that you need to call the website or check with them, that is unnecessary because this is not controversial information. This is not controversial statement or something which what you call that is a negative in nature. So, I think that is my explanation why I did what I did towards Yang Berhormat Padungan and yourself. So, with that, I think I also have one pantun;
Tuan Puteri menjamu hidangan, Jeruk mangga turut disaji, Hari ini selesailah persidangan, Esok pula bersambung lagi.
Ahli-ahli Yang Berhormat, the sitting is now adjourned, and the House shall resume its sitting at 9.00 a.m. tomorrow, thank you. Assalamuailakum, Insya-Allah.
(Mesyuarat ditangguhkan pada pukul 5.11 petang)